Cities Index.
Agenda packet

Milpitas City Council
December 2, 2025

Document
Agenda packet
Meeting
December 2, 2025
Body
Milpitas City Council
Pages
1,283
Original file
59.9 MB
Text extracted from the city's file for reading and search. Open the original on milpitasca.api.civicclerk.com. That file is the official record.

041525-FNR

v052824 3

8) /ŶĐůƵĚĞĚ^ŽůƵƟŽŶƐ͘ ^ƵƉƉůŝĞƌ͛ƐWƌŽƉŽƐĂůƚŽƚŚĞĂďŽǀĞƌĞĨĞƌĞŶĐĞĚZ&Wis incorporated into this Master ŐƌĞĞŵĞŶƚ͘KŶůLJƚŚŽƐĞ^ŽůƵƟŽŶƐŝŶĐůƵĚĞĚǁŝƚŚŝŶ^ƵƉƉůŝĞƌ͛ƐWƌŽƉŽƐĂůĂŶĚǁŝƚŚŝŶ^ĐŽƉĞ;/ŶĐůƵĚĞĚ ^ŽůƵƟŽŶƐͿĂƌĞŝŶĐůƵĚĞĚǁŝƚŚŝŶƚŚĞŐƌĞĞŵĞŶƚĂŶĚŵĂLJďĞŽīĞƌĞĚƚŽWĂƌƟĐŝƉĂƟŶŐ ŶƟƟĞƐ.

9) /ŶĚĞĮŶŝƚĞYƵĂŶƟƚLJ͘ dŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚĚĞĮŶĞƐĂŶŝŶĚĞĮŶŝƚĞƋƵĂŶƟƚLJŽĨƐĂůĞƐƚŽĞůŝŐŝďůĞ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐ.

10) WƌŝĐŝŶŐ͘ WƌŝĐŝŶŐŝŶĨŽƌŵĂƟŽŶ;ŝŶĐůƵĚŝŶŐWƌŝĐŝŶŐĂŶĚĞůŝǀĞƌLJĂŶĚWƌŝĐŝŶŐKīĞƌĞĚtĂďůĞƐͿĨŽƌĂůů/ŶĐůƵĚĞĚ ^ŽůƵƟŽŶƐǁŝƚŚŝŶ^ƵƉƉůŝĞƌ͛ƐWƌŽƉŽƐĂůŝƐŝŶĐŽƌƉŽƌĂƚĞĚŝŶƚŽƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚ͘

11) EŽƚƚŽ
džĐĞĞĚWƌŝĐŝŶŐ͘ Suppliers may not exceed the prices listed in the current Pricing List ŽŶĮůĞ with Sourcewell ǁŚĞŶŽīĞƌŝŶŐ/ŶĐůƵĚĞĚ^ŽůƵƟŽŶƐƚŽWĂƌƟĐŝƉĂƟŶŐ ŶƟƟĞƐ͘WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐŵĂLJ
ƌĞƋƵĞƐƚĂĚũƵƐƚŵĞŶƚƐƚŽƉƌŝĐŝŶŐĚŝƌĞĐƚůLJĨƌŽŵ^ƵƉƉůŝĞƌĚƵƌŝŶŐƚŚĞŶĞŐŽƟĂƟŽŶĂŶĚĞdžĞĐƵƟŽŶŽĨĂŶLJ ƚƌĂŶƐĂĐƟŽŶ.

12) KƉĞŶDĂƌŬĞƚ͘ ^ƵƉƉůŝĞƌ͛ƐŽƉĞŶŵĂƌŬĞƚƉƌŝĐŝŶŐprocess is included within its Proposal.

ϭϯͿ ^ƵƉƉůŝĞƌZĞƉƌĞƐĞŶƚĂƟŽŶƐ͗

i) ŽŵƉůŝĂŶĐĞ͘ Supplier represents and warrants it will provide all Included ^ŽůƵƟŽŶƐ ƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚŝŶĨƵůůĐŽŵƉůŝĂŶĐĞǁŝƚŚĂƉƉůŝĐĂďůĞĨĞĚĞƌĂů͕ƐƚĂƚĞ͕ĂŶĚůŽĐĂůůĂǁƐĂŶĚ ƌĞŐƵůĂƟŽŶƐ͘

ii) >ŝĐĞŶƐĞƐ͘ ƐĂƉƉůŝĐĂďůĞ͕^ƵƉƉůŝĞƌǁŝůůŵĂŝŶƚĂŝŶĂǀĂůŝĚƐƚĂƚƵƐŽŶĂůůƌĞƋƵŝƌĞĚĨĞĚĞƌĂů͕ƐƚĂƚĞ͕ ĂŶĚůŽĐĂůůŝĐĞŶƐĞƐ͕ďŽŶĚƐ͕ĂŶĚƉĞƌŵŝƚƐƌĞƋƵŝƌĞĚĨŽƌƚŚĞŽƉĞƌĂƟŽŶŽĨ^ƵƉƉůŝĞƌ͛ƐďƵƐŝŶĞƐƐǁŝƚŚ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐ͘WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐŵĂLJƌĞƋƵĞƐƚĂůůƌĞůĞǀĂŶƚĚŽĐƵŵĞŶƚĂƟŽŶĚŝƌĞĐƚůLJĨƌŽŵ Supplier.

iii) ^ƵƉƉůŝĞƌtĂƌƌĂŶƚƐ͘ Supplier warrants that all Included ^ŽůƵƟŽŶƐĨƵƌŶŝƐŚĞĚƵŶĚĞƌƚŚŝƐ ŐƌĞĞŵĞŶƚĂƌĞĨƌĞĞĨƌŽŵůŝĞŶƐĂŶĚĞŶĐƵŵďƌĂŶĐĞƐ͕ĂŶĚĂƌĞĨƌĞĞĨƌŽŵĚĞĨĞĐƚƐŝŶĚĞƐŝŐŶ͕ŵĂƚĞƌŝĂůƐ͕ ĂŶĚǁŽƌŬŵĂŶƐŚŝƉ͘/ŶĂĚĚŝƟŽŶ͕^ƵƉƉůŝĞƌǁĂƌƌĂŶƚƐƚŚĞ^ŽůƵƟŽŶƐĂƌĞƐƵŝƚĂďůĞĨŽƌĂŶĚǁŝůůƉĞƌĨŽƌŵ in accordance with the ordinary uƐĞĨŽƌǁŚŝĐŚƚŚĞLJĂƌĞŝŶƚĞŶĚĞĚ͘

14) ĂŶŬƌƵƉƚĐLJEŽƟĐĞƐ͘ ^ƵƉƉůŝĞƌĐĞƌƟĮĞƐĂŶĚǁĂƌƌĂŶƚƐŝƚŝƐŶŽƚĐƵƌƌĞŶƚůLJŝŶĂďĂŶŬƌƵƉƚĐLJƉƌŽĐĞĞĚŝŶŐ͘ Supplier has disclosed all current and completed bankruptcy proceedings within the past seven years ǁŝƚŚŝŶŝƚƐWƌŽƉŽƐĂů͘^ƵƉƉůŝĞƌŵƵƐƚƉƌŽǀŝĚĞŶŽƟĐĞŝŶǁƌŝƟŶŐƚŽ^ŽƵƌĐĞǁĞůůŝĨŝƚĞŶƚĞƌƐĂďĂŶŬƌƵƉƚĐLJ ƉƌŽĐĞĞĚŝŶŐĂƚĂŶLJƟŵĞĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

15) ĞďĂƌŵĞŶƚĂŶĚ^ƵƐƉĞŶƐŝŽŶ͘ ^ƵƉƉůŝĞƌĐĞƌƟĮĞƐĂŶĚǁĂƌƌĂŶƚƐƚŚĂƚŶĞŝƚŚĞƌŝƚŶŽƌŝƚƐƉƌŝŶĐŝƉĂůƐĂƌĞ ƉƌĞƐĞŶƚůLJĚĞďĂƌƌĞĚ͕ƐƵƐƉĞŶĚĞĚ͕ƉƌŽƉŽƐĞĚĨŽƌĚĞďĂƌŵĞŶƚ͕ĚĞĐůĂƌĞĚŝŶĞůŝŐŝďůĞ͕ŽƌǀŽůƵŶƚĂƌŝůLJĞdžĐůƵĚĞĚ ĨƌŽŵƉƌŽŐƌĂŵƐŽƉĞƌĂƚĞĚďLJƚŚĞ^ƚĂƚĞŽĨDŝŶŶĞƐŽƚĂ͕ƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐĨĞĚĞƌĂůŐŽǀĞƌŶŵĞnt, or any WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ͘^ƵƉƉůŝĞƌĐĞƌƟĮĞƐĂŶĚǁĂƌƌĂŶƚƐƚŚĂƚŶĞŝƚŚĞƌŝƚŶŽƌŝƚƐƉƌŝŶĐŝƉĂůƐŚĂǀĞďĞĞŶ ĐŽŶǀŝĐƚĞĚŽĨĂĐƌŝŵŝŶĂůŽīĞŶƐĞƌĞůĂƚĞĚƚŽƚŚĞƐƵďũĞĐƚŵĂƩĞƌŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘^ƵƉƉůŝĞƌĨƵƌƚŚĞƌ warrants that it will pƌŽǀŝĚĞŝŵŵĞĚŝĂƚĞǁƌŝƩĞŶŶŽƟĐĞƚŽ^ŽƵƌĐĞǁĞůůŝĨƚŚŝƐĐĞƌƟĮĐĂƟŽŶĐŚĂŶŐĞƐĂƚ ĂŶLJƟŵĞĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

16) WƌŽǀŝƐŝŽŶƐĨŽƌŶŽŶ-hŶŝƚĞĚ^ƚĂƚĞƐĨĞĚĞƌĂůĞŶƟƚLJƉƌŽĐƵƌĞŵĞŶƚƐƵŶĚĞƌhŶŝƚĞĚ^ƚĂƚĞƐĨĞĚĞƌĂůĂǁĂƌĚƐ ŽƌŽƚŚĞƌĂǁĂƌĚƐ;ƉƉĞŶĚŝdžII ƚŽϮ͘&͘ZΑϮϬϬͿ͘ WĂƌƟĐŝƉĂƟŶŐ ŶƟƟĞƐƚŚĂƚƵƐĞhŶŝƚĞĚ^ƚĂƚĞƐĨĞĚĞƌĂů

 

!





 




Page 96 of 1283 ends

041525-FNR

v052824 4

ŐƌĂŶƚŽƌŽƚŚĞƌĨĞĚĞƌĂůĨƵŶĚŝŶŐƚŽƉƵƌĐŚĂƐĞƐŽůƵƟŽŶƐĨƌŽŵƚŚŝƐŐƌĞĞŵĞŶƚŵĂLJďĞƐƵďũĞĐƚƚŽ ĂĚĚŝƟŽŶĂůƌĞƋƵŝƌĞŵĞŶƚƐŝŶĐůƵĚŝŶŐƚŚĞƉƌŽĐƵƌĞŵĞŶƚƐƚĂŶĚĂƌĚƐŽĨƚŚĞhŶŝĨŽƌŵĚŵŝŶŝƐƚƌĂƟǀĞ ZĞƋƵŝƌĞŵĞŶƚƐ͕ŽƐƚWƌŝŶĐŝƉůĞƐĂŶĚƵĚŝƚZĞƋƵŝƌĞŵĞŶƚƐĨŽƌ&ĞĚĞƌĂůǁĂƌĚƐ͕Ϯ͘&͘Z͘ΑϮϬϬ͘ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐŵĂLJŚĂǀĞĂĚĚŝƟŽŶĂůƌĞƋƵŝƌĞŵĞŶƚƐďĂƐĞĚŽŶƐƉĞĐŝĮĐĨƵŶĚŝŶŐƐŽƵƌĐĞƚĞƌŵƐŽƌ ĐŽŶĚŝƟŽŶƐ͘tŝƚŚŝŶƚŚŝƐ^ĞĐƟŽŶ͕ĂůůƌĞĨĞƌĞŶĐĞƐƚŽ͞ĨĞĚĞƌĂů͟ƐŚŽƵůĚďĞŝŶƚĞƌƉƌĞƚĞĚƚŽŵĞĂŶƚŚĞhŶŝƚĞĚ ^ƚĂƚĞƐĨĞĚĞƌĂůŐŽǀĞƌŶŵĞŶƚ͘dŚĞĨŽůůŽǁŝŶŐůŝƐƚĂƉƉůŝĞƐǁŚĞŶĂWĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJĂĐĐĞƐƐĞƐ^ƵƉƉůŝĞƌ͛Ɛ
Included ^ŽůƵƟŽŶƐǁŝƚŚhŶŝƚĞĚ^ƚĂƚĞƐĨĞĚĞƌĂůĨƵŶĚƐ͘

i)
Yh>
DW>KzD
EdKWWKZdhE/dz ͘
džĐĞƉƚĂƐŽƚŚĞƌǁŝƐĞƉƌŽǀŝĚĞĚƵŶĚĞƌϰϭ͘& ͘Z͘Α
60, all agreements ƚŚĂƚŵĞĞƚƚŚĞĚĞĮŶŝƟŽŶŽĨ͞ĨĞĚĞƌĂůůLJĂƐƐŝƐƚĞĚĐŽŶƐƚƌƵĐƟŽŶĐŽŶƚƌĂĐƚ͟ŝŶϰϭ ͘&͘Z͘ΑϲϬ-ϭ͘ϯŵƵƐƚŝŶĐůƵĚĞƚŚĞĞƋƵĂůŽƉƉŽƌƚƵŶŝƚLJĐůĂƵƐĞƉƌŽǀŝĚĞĚƵŶĚĞƌϰϭ͘&͘Z͘ΑϲϬ-1.4(b), in ĂĐĐŽƌĚĂŶĐĞǁŝƚŚ
džĞĐƵƟǀĞKƌĚĞƌϭϭϮϰϲ͕͞
ƋƵĂů
ŵƉůŽLJŵĞŶƚKƉƉŽƌƚƵŶŝƚLJ͟;ϯϬ&ZϭϮϯϭϵ͕ϭϮϵϯϱ͕
ϯ͘&͘Z͘Α͕ϭϵϲϰ-ϭϵϲϱŽŵƉ͕͘Ɖ͘ϯϯϵͿ͕ĂƐĂŵĞŶĚĞĚďLJ
džĞĐƵƟǀĞKƌĚĞƌϭϭϯϳϱ͕͞ŵĞŶĚŝŶŐ

džĞĐƵƟǀĞKƌĚĞƌϭϭϮϰϲZĞůĂƟŶŐƚŽ
ƋƵĂů
ŵƉůŽLJŵĞŶƚKƉƉŽƌƚƵŶŝƚLJ͕͟ ĂŶĚŝŵƉůĞŵĞŶƟŶŐ
ƌĞŐƵůĂƟŽŶƐĂƚϰϭ͘&͘Z͘ΑϲϬ͕͞KĸĐĞŽĨ&ĞĚĞƌĂůŽŶƚƌĂĐƚŽŵƉůŝĂŶĐĞWƌŽŐƌĂŵƐ͕ ƋƵĂů

ŵƉůŽLJŵĞŶƚKƉƉŽƌƚƵŶŝƚLJ͕ĞƉĂƌƚŵĞŶƚŽĨ>ĂďŽƌ ͘͟dŚĞĞƋƵĂůŽƉƉŽƌƚƵŶŝƚLJĐůĂƵƐĞŝƐŝŶĐŽƌƉŽƌĂƚĞĚ ŚĞƌĞŝŶďLJƌĞĨĞƌĞŶĐĞ͘

ii) DAVIS-KEd͕^D
E
;ϰϬh͘^͘͘Αϯϭϰϭ-ϯϭϰϴͿ͘ tŚĞŶƌĞƋƵŝƌĞĚďLJĨĞĚĞƌĂů
ƉƌŽŐƌĂŵůĞŐŝƐůĂƟŽŶ͕ĂůůƉƌŝŵĞĐŽŶƐƚƌƵĐƟŽŶĐŽŶƚƌĂĐƚƐŝŶĞdžĐĞƐƐŽĨΨϮ͕ϬϬϬĂǁĂƌĚĞĚďLJŶŽŶ-ĨĞĚĞƌĂů ĞŶƟƟĞƐŵƵƐƚŝŶĐůƵĚĞĂƉƌŽǀŝƐŝŽŶĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞĂǀŝƐ-ĂĐŽŶĐƚ;ϰϬh͘^͘͘Αϯϭϰϭ- ϯϭϰϰ͕ĂŶĚϯϭϰϲ-ϯϭϰϴͿĂƐƐƵƉƉůĞŵĞŶƚĞĚďLJĞƉĂƌƚŵĞŶƚŽĨ>ĂďŽƌƌĞŐƵůĂƟŽŶƐ;Ϯϵ͘&͘Z͘Αϱ͕ ͞>ĂďŽƌ^ƚĂŶĚĂƌĚƐWƌŽǀŝƐŝŽŶƐƉƉůŝĐĂďůĞƚŽŽŶƚƌĂĐƚƐŽǀĞƌŝŶŐ&ĞĚĞƌĂůůLJ&ŝŶĂŶĐĞĚĂŶĚƐƐŝƐƚĞĚ ŽŶƐƚƌƵĐƟŽŶ͟Ϳ͘/ŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚƚŚĞƐƚĂƚƵƚĞ͕ĐŽŶƚƌĂĐƚŽƌƐŵƵƐƚ ďĞƌĞƋƵŝƌĞĚƚŽƉĂLJǁĂŐĞƐƚŽ ůĂďŽƌĞƌƐĂŶĚŵĞĐŚĂŶŝĐƐĂƚĂƌĂƚĞŶŽƚůĞƐƐƚŚĂŶƚŚĞƉƌĞǀĂŝůŝŶŐǁĂŐĞƐƐƉĞĐŝĮĞĚŝŶĂǁĂŐĞ ĚĞƚĞƌŵŝŶĂƟŽŶŵĂĚĞďLJƚŚĞ^ĞĐƌĞƚĂƌLJŽĨ>ĂďŽƌ ͘/ŶĂĚĚŝƟŽŶ͕ĐŽŶƚƌĂĐƚŽƌƐŵƵƐƚďĞƌĞƋƵŝƌĞĚƚŽƉĂLJ wages not less than once a week. The non-ĨĞĚĞƌĂůĞŶƟƚLJŵƵƐƚƉůĂĐĞĂĐŽƉLJŽĨƚŚĞĐƵƌƌĞŶƚ ƉƌĞǀĂŝůŝŶŐǁĂŐĞĚĞƚĞƌŵŝŶĂƟŽŶŝƐƐƵĞĚďLJƚŚĞĞƉĂƌƚŵĞŶƚŽĨ>ĂďŽƌŝŶĞĂĐŚƐŽůŝĐŝƚĂƟŽŶ͘dŚĞ ĚĞĐŝƐŝŽŶƚŽĂǁĂƌĚĂĐŽŶƚƌĂĐƚŽƌƐƵďĐŽŶƚƌĂĐƚŵƵƐƚďĞĐŽŶĚŝƟŽŶĞĚƵƉŽŶƚŚĞĂĐĐĞƉƚĂŶĐĞŽĨƚŚĞ ǁĂŐĞĚĞƚĞƌŵŝŶĂƟŽŶ͘dŚĞŶŽŶ-ĨĞĚĞƌĂůĞŶƟƚLJŵƵƐƚƌĞƉŽƌƚĂůůƐƵƐƉĞĐƚĞĚŽƌƌĞƉŽƌƚĞĚǀŝŽůĂƟŽŶƐƚŽ ƚŚĞĨĞĚĞƌĂůĂǁĂƌĚŝŶŐĂŐĞŶĐLJ͘dŚĞĐŽŶƚƌĂĐƚƐŵƵƐƚĂůƐŽŝŶĐůƵĚĞĂƉƌŽǀŝƐŝŽŶĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞ ŽƉĞůĂŶĚ͞ŶƟ-<ŝĐŬďĂĐŬ͟Đƚ;ϰϬh͘^͘͘ΑϯϭϰϱͿ͕ĂƐƐƵƉƉůĞŵĞŶƚĞĚďLJĞƉĂƌƚŵĞŶƚŽĨ>ĂďŽƌ regulaƟŽŶƐ;Ϯϵ͘&͘Z͘Αϯ͕͞ŽŶƚƌĂĐƚŽƌƐĂŶĚ^ƵďĐŽŶƚƌĂĐƚŽƌƐŽŶWƵďůŝĐƵŝůĚŝŶŐŽƌWƵďůŝĐtŽƌŬ &ŝŶĂŶĐĞĚŝŶtŚŽůĞŽƌŝŶWĂƌƚďLJ>ŽĂŶƐŽƌ'ƌĂŶƚƐĨƌŽŵƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐ͟Ϳ͘dŚĞĐƚƉƌŽǀŝĚĞƐƚŚĂƚ ĞĂĐŚĐŽŶƚƌĂĐƚŽƌŽƌƐƵďƌĞĐŝƉŝĞŶƚŵƵƐƚďĞƉƌŽŚŝďŝƚĞĚĨƌŽŵŝŶĚƵĐŝŶŐ͕ďLJĂŶLJ means, any person
ĞŵƉůŽLJĞĚŝŶƚŚĞĐŽŶƐƚƌƵĐƟŽŶ͕ĐŽŵƉůĞƟŽŶ͕ŽƌƌĞƉĂŝƌŽĨƉƵďůŝĐǁŽƌŬ͕ƚŽŐŝǀĞƵƉĂŶLJƉĂƌƚŽĨƚŚĞ ĐŽŵƉĞŶƐĂƟŽŶƚŽǁŚŝĐŚŚĞŽƌƐŚĞŝƐŽƚŚĞƌǁŝƐĞĞŶƟƚůĞĚ͘dŚĞŶŽŶ-ĨĞĚĞƌĂůĞŶƟƚLJŵƵƐƚƌĞƉŽƌƚĂůů ƐƵƐƉĞĐƚĞĚŽƌƌĞƉŽƌƚĞĚǀŝŽůĂƟŽŶƐƚŽƚŚĞĨĞĚĞƌĂůawarding agency. Supplier must comply with all ĂƉƉůŝĐĂďůĞĂǀŝƐ-Bacon Act provisions.

iii) KEdZdtKZ<,KhZ^E^&
dz^dEZ^d;ϰϬh͘^͘͘ΑϯϳϬϭ-ϯϳϬϴͿ͘
Where applicable, all contracts awarded by the non-ĨĞĚĞƌĂůĞŶƟƚLJŝŶĞdžĐĞƐƐŽĨΨϭϬϬ͕ϬϬϬƚŚĂƚ ŝŶǀŽůǀĞƚŚĞĞŵƉůŽLJŵĞŶƚŽĨŵĞĐŚĂŶŝĐƐŽƌůĂďŽƌĞƌƐŵƵƐƚŝŶĐůƵĚĞĂƉƌŽǀŝƐŝŽŶĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚ ϰϬh͘^͘͘ΑΑϯϳϬϮĂŶĚϯϳϬϰ͕ĂƐƐƵƉƉůĞŵĞŶƚĞĚďLJĞƉĂƌƚŵĞŶƚŽĨ>ĂďŽƌƌĞŐƵůĂƟŽŶƐ;Ϯϵ͘&͘Z͘ΑϱͿ͘ hŶĚĞƌϰϬh͘^͘͘ΑϯϳϬϮŽĨƚŚĞĐƚ͕ĞĂĐŚĐŽŶƚƌĂĐƚŽƌŵƵƐƚďĞƌĞƋƵŝƌĞĚƚŽĐŽŵƉƵƚĞƚŚĞǁĂŐĞƐŽĨ ĞǀĞƌLJŵĞĐŚĂŶŝĐĂŶĚůĂďŽƌĞƌŽŶƚŚĞďĂƐŝƐŽĨĂƐƚĂŶĚĂƌĚǁŽƌŬǁĞĞŬŽĨϰϬŚŽƵƌƐ͘tŽƌŬŝŶĞdžĐĞƐƐŽĨ the standard work week is permissible provŝĚĞĚƚŚĂƚƚŚĞǁŽƌŬĞƌŝƐĐŽŵƉĞŶƐĂƚĞĚĂƚĂƌĂƚĞŽĨŶŽƚ ůĞƐƐƚŚĂŶŽŶĞĂŶĚĂŚĂůĨƟŵĞƐƚŚĞďĂƐŝĐƌĂƚĞŽĨƉĂLJĨŽƌĂůůŚŽƵƌƐǁŽƌŬĞĚŝŶĞdžĐĞƐƐŽĨϰϬŚŽƵƌƐŝŶ 
 

!





 




Page 97 of 1283 ends

041525-FNR

v052824 5

ƚŚĞǁŽƌŬǁĞĞŬ͘dŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨϰϬh͘^͘͘ΑϯϳϬϰĂƌĞĂƉƉůŝĐĂďůĞƚŽĐŽŶƐƚƌƵĐƟŽŶǁŽƌŬĂŶĚ ƉƌŽǀŝĚĞƚŚĂƚŶŽůĂďŽƌĞƌŽƌŵĞĐŚĂŶŝĐŵƵƐƚďĞƌĞƋƵŝƌĞĚƚŽǁŽƌŬŝŶƐƵƌƌŽƵŶĚŝŶŐƐŽƌƵŶĚĞƌǁŽƌŬŝŶŐ ĐŽŶĚŝƟŽŶƐǁŚŝĐŚĂƌĞƵŶƐĂŶŝƚĂƌLJ͕ŚĂnjĂƌĚŽƵƐŽƌĚĂŶŐĞƌŽƵƐ͘dŚĞƐĞƌĞƋƵŝƌĞments do not apply to ƚŚĞƉƵƌĐŚĂƐĞƐŽĨƐƵƉƉůŝĞƐ͕ŵĂƚĞƌŝĂůƐ͕ŽƌĂƌƟĐůĞƐŽƌĚŝŶĂƌŝůLJĂǀĂŝůĂďůĞŽŶƚŚĞŽƉĞŶŵĂƌŬĞƚ͕Žƌ ĐŽŶƚƌĂĐƚƐĨŽƌƚƌĂŶƐƉŽƌƚĂƟŽŶŽƌƚƌĂŶƐŵŝƐƐŝŽŶŽĨŝŶƚĞůůŝŐĞŶĐĞ͘dŚŝƐƉƌŽǀŝƐŝŽŶŝƐŚĞƌĞďLJŝŶĐŽƌƉŽƌĂƚĞĚ ďLJƌĞĨĞƌĞŶĐĞŝŶƚŽƚŚŝƐŐƌĞĞŵĞŶƚ͘^ƵƉƉůŝĞƌĐĞƌƟĮĞƐƚŚĂƚĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨĂŶĂǁĂƌĚĨŽƌĂůů ŐƌĞĞŵĞŶƚƐďLJ^ŽƵƌĐĞǁĞůůƌĞƐƵůƟŶŐĨƌŽŵƚŚŝƐƉƌŽĐƵƌĞŵĞŶƚƉƌŽĐĞƐƐ͕^ƵƉƉůŝĞƌŵƵƐƚĐŽŵƉůLJǁŝƚŚ ĂƉƉůŝĐĂďůĞƌĞƋƵŝƌĞŵĞŶƚƐĂƐƌĞĨĞƌĞŶĐĞĚĂďŽǀĞ͘

iv) Z/',d^dK/Es
Ed/KE^D
hE
ZKEdZdKZ'Z

D
Ed͘ /ĨƚŚĞĨĞĚĞƌĂů
ĂǁĂƌĚŵĞĞƚƐƚŚĞĚĞĮŶŝƟŽŶŽĨ͞ĨƵŶĚŝŶŐĂŐƌĞĞŵĞŶƚ͟ƵŶĚĞƌϯϳ͘&͘Z͘ΑϰϬϭ͘Ϯ;ĂͿĂŶĚƚŚĞƌĞĐŝƉŝĞŶƚ ŽƌƐƵďƌĞĐŝƉŝĞŶƚǁŝƐŚĞƐƚŽĞŶƚĞƌŝŶƚŽĂĐŽŶƚƌĂĐƚǁŝƚŚĂƐŵĂůůďƵƐŝŶĞƐƐĮƌŵŽƌŶŽŶƉƌŽĮƚ ŽƌŐĂŶŝnjĂƟŽŶƌĞŐĂƌĚŝŶŐƚŚĞƐƵďƐƟƚƵƟŽŶŽĨƉĂƌƟĞƐ͕ĂƐƐŝŐŶŵĞŶƚŽƌƉĞƌĨŽƌŵĂŶĐĞŽĨĞdžƉĞƌŝŵĞŶƚĂů͕ ĚĞǀĞůŽƉŵĞŶƚĂů͕ŽƌƌĞƐĞĂƌĐŚǁŽƌŬƵŶĚĞƌƚŚĂƚ͞ĨƵŶĚŝŶŐĂŐƌĞĞŵĞŶƚ͕͟ƚŚĞƌĞĐŝƉŝĞŶƚŽƌƐƵďƌĞĐŝƉŝĞŶƚ ŵƵƐƚĐŽŵƉůLJǁŝƚŚƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨϯϳ͘&͘Z͘ΑϰϬϭ͕͞ZŝŐŚƚƐƚŽ/ŶǀĞŶƟŽŶƐDĂĚĞďLJEŽŶƉƌŽĮƚ KƌŐĂŶŝnjĂƟŽŶƐĂŶĚ^ŵĂůůƵƐŝŶĞƐƐ&ŝƌŵƐhŶĚĞƌ'ŽǀĞƌŶŵĞŶƚ'ƌĂŶƚƐ͕ŽŶƚƌĂĐƚƐĂŶĚŽŽƉĞƌĂƟǀĞ ŐƌĞĞŵĞŶƚƐ͕͟ĂŶĚĂŶLJŝŵƉůĞŵĞŶƟŶŐƌĞŐƵůĂƟŽŶƐŝƐƐƵĞĚďLJƚŚĞĂǁĂƌĚŝŶŐĂŐĞŶĐLJ͘^ƵƉƉůŝĞƌ ĐĞƌƟĮĞƐƚŚĂƚĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨĂŶĂǁĂƌĚĨŽƌĂůůŐƌĞĞŵĞŶƚƐďLJ^ŽƵƌĐĞǁĞůůƌĞƐƵůƟŶŐĨƌŽŵƚŚŝƐ ƉƌŽĐƵƌĞŵĞŶƚƉƌŽĐĞƐƐ͕^ƵƉƉůŝĞƌŵƵƐƚĐŽŵƉůLJǁŝƚŚĂƉƉůŝĐĂďůĞƌĞƋƵŝƌĞŵĞŶƚƐĂƐƌĞĨĞƌĞŶĐĞĚĂďŽǀĞ͘

v) >
E/Zd;ϰϮh͘^͘͘ΑϳϰϬϭ-ϳϲϳϭY͘ͿEd,
&

Z>td
ZWK>>hd/KE
KEdZK>d;ϯϯh͘^͘͘ΑϭϮϱϭ-ϭϯϴϳͿ͘ ŽŶƚƌĂĐƚƐĂŶĚƐƵďŐƌĂŶƚƐŽĨĂŵŽƵŶƚƐŝŶĞdžĐĞƐƐŽĨ ΨϭϱϬ͕ϬϬϬƌĞƋƵŝƌĞƚŚĞŶŽŶ-ĨĞĚĞƌĂůĂǁĂƌĚƚŽĂŐƌĞĞƚŽĐŽŵƉůLJǁŝƚŚĂůůĂƉƉůŝĐĂďůĞƐƚĂŶĚĂƌĚƐ͕ŽƌĚĞƌƐ ŽƌƌĞŐƵůĂƟŽŶƐŝƐƐƵĞĚƉƵƌƐƵĂŶƚƚŽƚŚĞůĞĂŶŝƌĐƚ;ϰϮh͘^͘͘ΑϳϰϬϭ- ϳϲϳϭƋͿĂŶĚƚŚĞ&ĞĚĞƌĂů tĂƚĞƌWŽůůƵƟŽŶŽŶƚƌŽůĐƚĂƐĂŵĞŶĚĞĚ;ϯϯh͘^͘͘ΑϭϮϱϭ- ϭϯϴϳͿ͘sŝŽůĂƟŽŶƐŵƵƐƚďĞƌĞƉŽƌƚĞĚƚŽ ƚŚĞ&ĞĚĞƌĂůĂǁĂƌĚŝŶŐĂŐĞŶĐLJĂŶĚƚŚĞZĞŐŝŽŶĂůKĸĐĞŽĨƚŚĞ ŶǀŝƌŽŶŵĞŶƚĂůWƌŽƚĞĐƟŽŶŐĞŶĐLJ
;
WͿ͘^ƵƉƉůŝĞƌĐĞƌƟĮĞƐƚŚĂƚĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨƚŚŝƐŐƌĞĞŵĞŶƚŝƚǁŝůůĐŽŵƉůLJǁŝƚŚĂƉƉůŝĐĂďůĞ ƌĞƋƵŝƌĞŵĞŶƚƐĂƐƌĞĨĞƌĞŶĐĞĚĂďŽǀĞ͘

vi) 
ZD
EdE^h^W
E^/KE;
y
hd/s
KZ
Z^ϭϮϱϰϵEϭϮϲϴϵͿ͘ A contract
ĂǁĂƌĚ;ƐĞĞϮ͘&͘Z͘ΑϭϴϬ͘ϮϮϬͿŵƵƐƚŶŽƚďĞŵĂĚĞƚŽƉĂƌƟĞƐůŝƐƚĞĚŽŶƚŚĞŐŽǀĞƌŶŵĞŶƚǁŝĚĞ ĞdžĐůƵƐŝŽŶƐŝŶƚŚĞ^LJƐƚĞŵĨŽƌǁĂƌĚDĂŶĂŐĞŵĞŶƚ;^DͿ͕ŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚƚŚĞKDŐƵŝĚĞůŝŶĞƐ ĂƚϮ͘&͘Z͘ΑϭϴϬƚŚĂƚŝŵƉůĞŵĞŶƚ
džĞĐƵƟǀĞKƌĚĞƌƐϭϮϱϰϵ;ϯ͘&͘Z͘ΑϭϵϴϲŽŵƉ͕͘Ɖ͘ϭϴϵͿĂŶĚ ϭϮϲϴϵ;ϯ͘&͘Z͘ΑϭϵϴϵŽŵƉ͕͘Ɖ͘ϮϯϱͿ͕͞ĞďĂƌŵĞŶƚĂŶĚ^ƵƐƉĞŶƐŝŽŶ͘͟^D džĐůƵƐŝŽŶƐĐŽŶƚĂŝŶƐ
ƚŚĞŶĂŵĞƐŽĨƉĂƌƟĞƐĚĞďĂƌƌĞĚ͕ƐƵƐƉĞŶĚĞĚ͕ŽƌŽƚŚĞƌǁŝƐĞĞdžĐůƵĚĞĚďLJĂŐĞŶĐŝĞƐ͕ĂƐǁĞůůĂƐƉĂƌƟĞƐ ĚĞĐůĂƌĞĚŝŶĞůŝŐŝďůĞƵŶĚĞƌƐƚĂƚƵƚŽƌLJŽƌƌĞŐƵůĂƚŽƌLJĂƵƚŚŽƌŝƚLJŽƚŚĞƌƚŚĂŶ džĞĐƵƟǀĞKƌĚĞƌϭϮϱϰϵ͘
^ƵƉƉůŝĞƌĐĞƌƟĮĞƐƚŚĂƚŶĞŝƚŚĞƌŝƚŶŽƌŝƚƐƉƌŝŶĐŝƉĂůƐĂƌĞƉƌĞƐĞŶƚůLJĚĞďĂƌƌĞĚ͕ƐƵƐƉĞŶĚĞĚ͕ƉƌŽƉŽƐĞĚ ĨŽƌĚĞďĂƌŵĞŶƚ͕ĚĞĐůĂƌĞĚŝŶĞůŝŐŝďůĞ͕ŽƌǀŽůƵŶƚĂƌŝůLJĞdžĐůƵĚĞĚĨƌŽŵƉĂƌƟĐŝƉĂƟŽŶďLJĂŶLJĨĞĚĞƌĂů department or agency.

vii) BYRD ANTI->Kz/E'D
ED
Ed ͕^D
E
;ϯϭh͘^͘͘ΑϭϯϱϮͿ͘ Suppliers must
ĮůĞĂŶLJƌĞƋƵŝƌĞĚĐĞƌƟĮĐĂƟŽŶƐ͘^ƵƉƉůŝĞƌƐŵƵƐƚŶŽƚŚĂǀĞƵƐĞĚĨĞĚĞƌĂůĂƉƉƌŽƉƌŝĂƚĞĚĨƵŶĚƐƚŽƉĂLJ ĂŶLJƉĞƌƐŽŶŽƌŽƌŐĂŶŝnjĂƟŽŶĨŽƌŝŶŇƵĞŶĐŝŶŐŽƌĂƩĞŵƉƟŶŐƚŽŝŶŇƵĞŶĐĞĂŶŽĸĐĞƌŽƌĞŵƉůŽLJĞĞŽĨ ĂŶLJĂŐĞŶĐLJ͕ĂŵĞŵďĞƌŽĨŽŶŐƌĞƐƐ͕ŽĸĐĞƌŽƌĞŵƉůŽLJĞĞŽĨŽŶŐƌĞƐƐ͕ŽƌĂŶĞŵƉůŽLJĞĞŽĨĂ ŵĞŵďĞƌŽĨŽŶŐƌĞƐƐŝŶĐŽŶŶĞĐƟŽŶǁŝƚŚŽďƚĂŝŶŝŶŐĂŶLJĨĞĚĞƌĂůĐŽŶƚƌĂĐƚ͕ŐƌĂŶƚ͕ŽƌĂŶLJŽƚŚĞƌ ĂǁĂƌĚĐŽǀĞƌĞĚďLJϯϭh͘^͘͘ΑϭϯϱϮ͘^ƵƉƉůŝĞƌƐŵƵƐƚĚŝƐĐůŽƐĞĂŶLJůŽďbying with non-ĨĞĚĞƌĂůĨƵŶĚƐ ƚŚĂƚƚĂŬĞƐƉůĂĐĞŝŶĐŽŶŶĞĐƟŽŶǁŝƚŚŽďƚĂŝŶŝŶŐĂŶLJĨĞĚĞƌĂůĂǁĂƌĚ͘^ƵĐŚĚŝƐĐůŽƐƵƌĞƐĂƌĞĨŽƌǁĂƌĚĞĚ 
 

!





 




Page 98 of 1283 ends

041525-FNR

v052824 6

ĨƌŽŵƟĞƌƚŽƟĞƌƵƉƚŽƚŚĞŶŽŶ-ĨĞĚĞƌĂůĂǁĂƌĚ͘^ƵƉƉůŝĞƌƐŵƵƐƚĮůĞĂůůĐĞƌƟĮĐĂƟŽŶƐĂŶĚĚŝƐĐůŽƐƵƌĞƐ ƌĞƋƵŝƌĞĚďLJ͕ĂŶĚŽƚŚĞƌǁŝƐĞĐŽŵƉůLJǁŝƚŚ͕ƚŚĞLJƌĚŶƟ->ŽďďLJŝŶŐŵĞŶĚŵĞŶƚ;ϯϭh͘^͘͘ΑϭϯϱϮͿ͘

viii) Z
KZZ
d
Ed/KEZ
Yh/Z
D
Ed^͘To the extent applicable, Supplier must comply
ǁŝƚŚƚŚĞƌĞĐŽƌĚƌĞƚĞŶƟŽŶƌĞƋƵŝƌĞŵĞŶƚƐĚĞƚĂŝůĞĚŝŶϮ͘&͘Z͘ΑϮϬϬ͘ϯϯϯ͘dŚĞ^ƵƉƉůŝĞƌĨƵƌƚŚĞƌ ĐĞƌƟĮĞƐƚŚĂƚŝƚǁŝůůƌĞƚĂŝŶĂůůƌĞĐŽƌĚƐĂƐƌĞƋƵŝƌĞĚďLJϮ͘&͘Z͘ΑϮϬϬ͘ϯϯϯĨŽƌĂƉĞƌŝŽĚŽĨϯLJĞĂƌƐĂŌĞƌ grantees or ƐƵďŐƌĂŶƚĞĞƐƐƵďŵŝƚĮŶĂůĞdžƉĞŶĚŝƚƵƌĞƌĞƉŽƌƚƐŽƌƋƵĂƌƚĞƌůLJŽƌĂŶŶƵĂůĮŶĂŶĐŝĂů ƌĞƉŽƌƚƐ͕ĂƐĂƉƉůŝĐĂďůĞ͕ĂŶĚĂůůŽƚŚĞƌƉĞŶĚŝŶŐŵĂƩĞƌƐĂƌĞĐůŽƐĞĚ͘

ix)
E
Z'zWK>/zEKE^
Zsd/KEdKDW>/E
͘ To the extent applicable,
^ƵƉƉůŝĞƌŵƵƐƚĐŽŵƉůLJǁŝƚŚƚŚĞŵĂŶĚĂƚŽƌLJƐƚĂŶĚĂƌĚƐĂŶĚƉŽůŝĐŝĞƐƌĞůĂƟŶŐƚŽĞŶĞƌŐLJĞĸĐŝĞŶĐLJ ǁŚŝĐŚĂƌĞĐŽŶƚĂŝŶĞĚŝŶƚŚĞƐƚĂƚĞĞŶĞƌŐLJĐŽŶƐĞƌǀĂƟŽŶƉůĂŶŝƐƐƵĞĚŝŶĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞ ŶĞƌŐLJ
WŽůŝĐLJĂŶĚŽŶƐĞƌǀĂƟŽŶĐƚ͘

x) hzD
Z/EWZKs/^/KE^KDW>/E
͘ To the extent applicable, Supplier must
ĐŽŵƉůLJǁŝƚŚĂůůĂƉƉůŝĐĂďůĞƉƌŽǀŝƐŝŽŶƐŽĨƚŚĞƵLJŵĞƌŝĐĂŶĐƚ͘WƵƌĐŚĂƐĞƐŵĂĚĞŝŶĂĐĐŽƌĚĂŶĐĞ ǁŝƚŚƚŚĞƵLJŵĞƌŝĐĂŶĐƚŵƵƐƚĨŽůůŽǁƚŚĞĂƉƉůŝĐĂďůĞƉƌŽĐƵƌĞŵĞŶƚƌƵůĞƐĐĂůůŝŶŐĨŽƌĨƌĞĞĂŶĚ ŽƉĞŶĐŽŵƉĞƟƟŽŶ͘

xi) 
^^dKZ
KZ^;Ϯ͘&͘Z͘ΑϮϬϬ͘ϯϯϲͿ͘ ^ƵƉƉůŝĞƌĂŐƌĞĞƐƚŚĂƚĚƵůLJĂƵƚŚŽƌŝnjĞĚ ƌĞƉƌĞƐĞŶƚĂƟǀĞƐŽĨĂĨĞĚĞƌĂůĂŐĞŶĐLJŵƵƐƚŚĂǀĞĂĐĐĞƐƐƚŽĂŶLJŬƐ͕ĚŽĐƵŵĞŶƚƐ͕ƉĂƉĞƌƐĂŶĚ ƌĞĐŽƌĚƐŽĨ^ƵƉƉůŝĞƌƚŚĂƚĂƌĞĚŝƌĞĐƚůLJƉĞƌƟŶĞŶƚƚŽ^ƵƉƉůŝĞƌ͛ƐĚŝƐĐŚĂƌŐĞŽĨŝƚƐŽďůŝŐĂƟŽŶƐƵŶĚĞƌƚŚŝƐ ŐƌĞĞŵĞŶƚĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨŵĂŬŝŶŐĂƵĚŝƚƐ͕ĞdžĂŵŝŶĂƟŽŶƐ͕ĞdžĐĞƌƉƚƐ͕ĂŶĚƚƌĂŶƐĐƌŝƉƟŽŶƐ͘dŚĞ ƌŝŐŚƚĂůƐŽŝŶĐůƵĚĞƐƟŵĞůLJĂŶĚƌĞĂƐŽŶĂďůĞĂĐĐĞƐƐƚŽ^ƵƉƉůŝĞƌ͛ƐƉĞƌƐŽŶŶĞůĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨ ŝŶƚĞƌǀŝĞǁĂŶĚĚŝƐĐƵƐƐŝŽŶƌĞůĂƟŶŐƚŽƐƵĐŚĚŽĐƵŵĞŶƚƐ͘

xii) WZKhZ
D
EdK&Z
Ks
Z
Dd
Z/>^;Ϯ͘&͘Z͘ΑϮϬϬ͘ϯϮϮͿ͘A non-ĨĞĚĞƌĂůĞŶƟƚLJ
ƚŚĂƚŝƐĂƐƚĂƚĞĂŐĞŶĐLJŽƌĂŐĞŶĐLJŽĨĂƉŽůŝƟĐĂůƐƵďĚŝǀŝƐŝŽŶŽĨĂƐƚĂƚĞĂŶĚŝƚƐĐŽŶƚƌĂĐƚŽƌƐŵƵƐƚ ĐŽŵƉůLJǁŝƚŚ^ĞĐƟŽŶϲϬϬϮŽĨƚŚĞ^ŽůŝĚtĂƐƚĞŝƐƉŽƐĂůĐƚ͕ĂƐĂŵĞŶĚĞĚďLJƚŚĞZĞƐŽƵƌĐĞ ŽŶƐĞƌǀĂƟŽŶĂŶĚZĞĐŽǀĞƌLJĐƚ͘dŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨ^ĞĐƟŽŶϲϬϬϮŝŶĐůƵĚĞƉƌŽĐƵƌŝŶŐŽŶůLJŝƚĞŵƐ ĚĞƐŝŐŶĂƚĞĚŝŶŐƵŝĚĞůŝŶĞƐŽĨƚŚĞ
ŶǀŝƌŽŶŵĞŶƚĂůWƌŽƚĞĐƟŽŶŐĞŶĐLJ;
WͿĂƚϰϬ͘&͘Z͘ΑϮϰϳƚŚĂƚ
ĐŽŶƚĂŝŶƚŚĞŚŝŐŚĞƐƚƉĞƌĐĞŶƚĂŐĞŽĨƌĞĐŽǀĞƌĞĚŵĂƚĞƌŝĂůƐƉƌĂĐƟĐĂďůĞ͕ consistent with maintaining a ƐĂƟƐĨĂĐƚŽƌLJůĞǀĞůŽĨĐŽŵƉĞƟƟŽŶ͕ǁŚĞƌĞƚŚĞƉƵƌĐŚĂƐĞƉƌŝĐĞŽĨƚŚĞŝƚĞŵĞdžĐĞĞĚƐΨϭϬ͕ϬϬϬŽƌƚŚĞ ǀĂůƵĞŽĨƚŚĞƋƵĂŶƟƚLJĂĐƋƵŝƌĞĚĚƵƌŝŶŐƚŚĞƉƌĞĐĞĚŝŶŐĮƐĐĂůLJĞĂƌĞdžĐĞĞĚĞĚΨϭϬ͕ϬϬϬ͖ƉƌŽĐƵƌŝŶŐ solid waste management services in a mĂŶŶĞƌƚŚĂƚŵĂdžŝŵŝnjĞƐĞŶĞƌŐLJĂŶĚƌĞƐŽƵƌĐĞƌĞĐŽǀĞƌLJ͖ ĂŶĚĞƐƚĂďůŝƐŚŝŶŐĂŶĂĸƌŵĂƟǀĞƉƌŽĐƵƌĞŵĞŶƚƉƌŽŐƌĂŵĨŽƌƉƌŽĐƵƌĞŵĞŶƚŽĨƌĞĐŽǀĞƌĞĚŵĂƚĞƌŝĂůƐ ŝĚĞŶƟĮĞĚŝŶƚŚĞ
WŐƵŝĚĞůŝŶĞƐ͘

xiii) &

Z>^
>;^Ϳ͕>K'K^͕E&>'^͘ The Supplier cannot use the seal(s), logos, crests, ŽƌƌĞƉƌŽĚƵĐƟŽŶƐŽĨŇĂŐƐŽƌůŝŬĞŶĞƐƐĞƐŽĨ&ĞĚĞƌĂůĂŐĞŶĐLJŽĸĐŝĂůƐǁŝƚŚŽƵƚƐƉĞĐŝĮĐƉƌĞ-approval.

xiv) EKK>/'d/KEz&

Z>'Ks
ZED
Ed͘ dŚĞh͘^͘ĨĞĚĞƌĂůŐŽǀĞƌŶŵĞŶƚŝƐŶŽƚĂƉĂƌƚLJ
ƚŽƚŚŝƐŐƌĞĞŵĞŶƚŽƌĂŶLJƉƵƌĐŚĂƐĞďLJĂWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJĂŶĚŝƐŶŽƚƐƵďũĞĐƚƚŽĂŶLJŽďůŝŐĂƟŽŶƐ
ŽƌůŝĂďŝůŝƟĞƐƚŽƚŚĞWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ͕^ƵƉƉůŝĞƌ͕ŽƌĂŶLJŽƚŚĞƌƉĂƌƚLJƉĞƌƚĂŝŶŝŶŐƚŽĂŶLJŵĂƩĞƌ ƌĞƐƵůƟŶŐĨƌŽŵƚŚĞŐƌĞĞŵĞŶƚŽƌĂŶLJƉƵƌĐŚĂƐĞďLJĂŶĂƵƚŚŽƌŝnjĞĚƵƐĞƌ͘

xv) WZK'ZD&ZhE&>^
KZ&Zhh>
Ed^dd
D
Ed^KZZ
>d
d^͘ The
ŽŶƚƌĂĐƚŽƌĂĐŬŶŽǁůĞĚŐĞƐƚŚĂƚϯϭh͘^͘͘Αϯϴ;ĚŵŝŶŝƐƚƌĂƟǀĞZĞŵĞĚŝĞƐĨŽƌ&ĂůƐĞůĂŝŵƐĂŶĚ 
 

!





 




Page 99 of 1283 ends

041525-FNR

v052824 7

^ƚĂƚĞŵĞŶƚƐͿĂƉƉůŝĞƐƚŽƚŚĞ^ƵƉƉůŝĞƌ͛ƐĂĐƟŽŶƐƉĞƌƚĂŝŶŝŶŐƚŽƚŚŝƐŐƌĞĞŵĞŶƚŽƌĂŶLJƉƵƌĐŚĂƐĞďLJĂ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ͘

xvi) &

Z>
d͘ dŚĞ^ƵƉƉůŝĞƌĐĞƌƟĮĞƐƚŚĂƚŝƚŝƐŶŽŶ-ĚĞůŝŶƋƵĞŶƚŝŶŝƚƐƌĞƉĂLJŵĞŶƚŽĨĂŶLJ ĨĞĚĞƌĂůĚĞďƚ͘
džĂŵƉůĞƐŽĨƌĞůĞǀĂŶƚĚĞďƚŝŶĐůƵĚĞĚĞůŝŶƋƵĞŶƚƉĂLJƌŽůůĂŶĚŽƚŚĞƌƚĂdžĞƐ͕ĂƵĚŝƚ ĚŝƐĂůůŽǁĂŶĐĞ͕ĂŶĚďĞŶĞĮƚŽǀĞƌƉĂLJŵĞŶƚƐ͘

xvii) KE&>/d^K&/Ed
Z
^d͘ dŚĞ^ƵƉƉůŝĞƌŵƵƐƚŶŽƟĨLJƚŚĞh͘^͘KĸĐĞŽĨ'ĞŶĞƌĂů^ĞƌǀŝĐĞƐ͕ ^ŽƵƌĐĞǁĞůů͕ĂŶĚWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJĂƐƐŽŽŶĂƐƉŽƐƐŝďůĞŝĨƚŚŝƐŐƌĞĞŵĞŶƚŽƌĂŶLJĂƐƉĞĐƚƌĞůĂƚĞĚ ƚŽƚŚĞĂŶƟĐŝƉĂƚĞĚǁŽƌŬƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚƌĂŝƐĞƐĂŶĂĐƚƵĂůŽƌƉŽƚĞŶƟĂůĐŽŶŇŝĐƚŽĨŝŶƚĞƌĞƐƚ(as ĚĞƐĐƌŝďĞĚŝŶϮ͘&͘Z͘WĂƌƚϮϬϬͿ͘dŚĞ^ƵƉƉůŝĞƌŵƵƐƚĞdžƉůĂŝŶƚŚĞĂĐƚƵĂůŽƌƉŽƚĞŶƟĂůĐŽŶŇŝĐƚŝŶ ǁƌŝƟŶŐŝŶƐƵĸĐŝĞŶƚĚĞƚĂŝůƐŽƚŚĂƚƚŚĞh͘^͘KĸĐĞŽĨ'ĞŶĞƌĂů^ĞƌǀŝĐĞƐ͕^ŽƵƌĐĞǁĞůů͕ĂŶĚ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJĂƌĞĂďůĞƚŽĂƐƐĞƐƐƚŚĞĂĐƚƵĂůŽƌƉŽƚĞŶƟĂůĐŽŶŇŝĐƚ͖ĂŶĚƉƌŽǀŝĚĞĂŶLJĂĚĚŝƟŽŶĂů ŝŶĨŽƌŵĂƟŽŶĂƐŶĞĐĞƐƐĂƌLJŽƌƌĞƋƵĞƐƚĞĚ͘

xviii) h͘^͘
y
hd/s
KZ
ZϭϯϮϮϰ͘ The Supplier, and its subcontractors, must comply with h͘^͘
džĞĐƵƟǀĞKƌĚĞƌϭϯϮϮϰĂŶĚh͘^͘>ĂǁƐƚŚĂƚƉƌŽŚŝďŝƚƚƌĂŶƐĂĐƟŽŶƐǁŝƚŚĂŶĚƉƌŽǀŝƐŝŽŶŽĨ ƌĞƐŽƵƌĐĞƐĂŶĚƐƵƉƉŽƌƚƚŽŝŶĚŝǀŝĚƵĂůƐĂŶĚŽƌŐĂŶŝnjĂƟŽŶƐĂƐƐŽĐŝĂƚĞĚǁŝƚŚƚĞƌƌŽƌŝƐŵ͘

xix) WZK,//d/KEKE
Zd/Ed
>
KDDhE/d/KE^Es/
K^hZs
/>>E

^
Zs/
^KZ
Yh/WD
Ed͘ dŽƚŚĞĞdžƚĞŶƚĂƉƉůŝĐĂďůĞ͕^ƵƉƉůŝĞƌĐĞƌƟĮĞƐƚŚĂƚĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨ ƚŚŝƐŐƌĞĞŵĞŶƚŝƚǁŝůůĐŽŵƉůLJǁŝƚŚĂƉƉůŝĐĂďůĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨϮ͘&͘Z͘ΑϮϬϬ͘Ϯϭϲ͘

xx) KD
^d/WZ
&
Z
E
^&KZWZKhZ
D
Ed^͘ To the extent applicable, Supplier
ĐĞƌƟĮĞƐƚŚĂƚĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͕^ƵƉƉůŝĞƌǁŝůůĐŽŵƉůLJǁŝƚŚĂƉƉůŝĐĂďůĞ ƌĞƋƵŝƌĞŵĞŶƚƐŽĨϮ͘&͘Z͘ΑϮϬϬ͘ϯϮϮ͘

ƌƟĐůĞϮ͗
^ŽƵƌĐĞǁĞůůĂŶĚ^ƵƉƉůŝĞƌKďůŝŐĂƟŽŶƐ

dŚĞd ĞƌŵƐŝŶƚŚŝƐƌƟĐůĞϮƌĞůĂƚĞƐƉĞĐŝĮĐĂůůLJƚŽ^ŽƵƌĐĞǁĞůůĂŶĚŝƚƐĂĚŵŝŶŝƐƚƌĂƟŽŶŽĨƚŚŝƐDĂƐƚĞƌ ŐƌĞĞŵĞŶƚǁŝƚŚ^ƵƉƉůŝĞƌĂŶĚ^ƵƉƉůŝĞƌ͛ƐŽďůŝŐĂƟŽŶƐƚŚĞƌĞƵŶĚĞƌ ͘

1) ƵƚŚŽƌŝnjĞĚ^ĞůůĞƌƐ͘^ƵƉƉůŝĞƌŵƵƐƚƉƌŽǀŝĚĞ^ŽƵƌĐĞǁĞůůĂĐƵƌƌĞŶƚŵĞĂŶƐƚŽǀĂůŝĚĂƚĞŽƌĂƵƚŚĞŶƟĐĂƚĞ ^ƵƉƉůŝĞƌ͛ƐĂƵƚŚŽƌŝnjĞĚĚĞĂůĞƌƐ͕ĚŝƐƚƌŝďƵƚŽƌƐ͕ŽƌƌĞƐĞůůĞƌƐǁŚŝĐŚŵĂLJĐŽŵƉůĞƚĞƚƌĂŶƐĂĐƟŽŶƐŽĨ/ŶĐůƵĚĞĚ ^ŽůƵƟŽŶƐŽīĞƌĞĚƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘^ŽƵƌĐĞǁĞůůŵĂLJƌĞƋƵĞƐƚƵƉĚĂƚĞĚŝŶĨŽƌŵĂƟŽŶŝŶŝƚƐ ĚŝƐĐƌĞƟŽŶ͕ĂŶĚ^ƵƉƉůŝĞƌĂŐƌĞĞƐƚŽƉƌŽǀŝĚĞƌĞƋƵĞƐƚĞĚŝŶĨŽƌŵĂƟŽŶǁŝƚŚŝŶĂƌĞĂƐŽŶĂďůĞƟŵĞ͘

2) WƌŽĚƵĐƚĂŶĚWƌŝĐĞŚĂŶŐĞƐZĞƋƵŝƌĞŵĞŶƚƐ͘ ^ƵƉƉůŝĞƌŵĂLJƌĞƋƵĞƐƚ/ŶĐůƵĚĞĚ^ŽůƵƟŽŶƐchanges, ĂĚĚŝƟŽŶƐ͕ŽƌĚĞůĞƟŽŶƐĂƚĂŶLJƟŵĞ͘ůůƌĞƋƵĞƐƚƐŵƵƐƚďĞŵĂĚĞŝŶǁƌŝƟŶŐďLJƐƵďŵŝƫŶŐĂ^ŽƵƌĐĞǁĞůů WƌŝĐĞĂŶĚWƌŽĚƵĐƚŚĂŶŐĞZĞƋƵĞƐƚ&ŽƌŵƚŽ^ŽƵƌĐĞǁĞůů͘ƚĂŵŝŶŝŵƵŵ͕ƚŚĞƌĞƋƵĞƐƚŵƵƐƚ͗ x /ĚĞŶƟĨLJƚŚĞĂƉƉůŝĐĂďůĞ^ŽƵƌĐĞǁĞůůŐƌĞĞŵĞŶƚŶƵŵďĞƌ͖
x ůĞĂƌůLJƐƉĞĐŝĨLJƚŚĞƌĞƋƵĞƐƚĞĚĐŚĂŶŐĞ͖
x WƌŽǀŝĚĞƐƵĸĐŝĞŶƚĚĞƚĂŝůƚŽũƵƐƟĨLJƚŚĞƌĞƋƵĞƐƚĞĚĐŚĂŶŐĞ͖ x /ŶĚŝǀŝĚƵĂůůLJůŝƐƚĂůů/ŶĐůƵĚĞĚ^ŽůƵƟŽŶƐĂīĞĐƚĞĚďLJƚŚĞƌĞƋƵĞƐƚĞĚĐŚĂŶŐĞ͕ĂůŽŶŐǁŝƚŚƚŚĞ ƌĞƋƵĞƐƚĞĚĐŚĂŶŐĞ;Ğ͘Ő͕͘ĂĚĚŝƟŽŶ͕ĚĞůĞƟŽŶ͕ƉƌŝĐĞĐŚĂŶŐĞͿ͖ĂŶĚ 
 

!





 




Page 100 of 1283 ends

041525-FNR

v052824 8

x /ŶĐůƵĚĞĂĐŽŵƉůĞƚĞƌĞƐƚĂƚĞŵĞŶƚŽĨWƌŝĐŝŶŐ>ŝƐƚǁŝƚŚƚŚĞĞīĞĐƟǀĞĚĂƚĞŽĨƚŚĞŵŽĚŝĮĞĚƉƌŝĐŝŶŐ͕ ŽƌƉƌŽĚƵĐƚĂĚĚŝƟŽŶŽƌĚĞůĞƟŽŶ͘dŚĞŶĞǁƉƌŝĐŝŶŐƌĞƐƚĂƚĞŵĞŶƚŵƵƐƚŝŶĐůƵĚĞĂůů/ŶĐůƵĚĞĚ ^ŽůƵƟŽŶƐŽīĞƌĞĚ͕ĞǀĞŶĨŽƌƚŚŽƐĞŝƚĞŵƐǁŚĞƌĞƉƌŝĐŝŶŐƌĞŵĂŝŶƐƵŶĐŚĂŶŐĞĚ͘

A ĨƵůůLJĞdžĞĐƵƚĞĚ^ŽƵƌĐĞǁĞůůWƌŝĐĞĂŶĚWƌŽĚƵĐƚŚĂŶŐĞZĞƋƵĞƐƚ&ŽƌŵǁŝůůďĞĐŽŵĞĂŶĂŵĞŶĚŵĞŶƚƚŽ ƚŚŝƐŐƌĞĞŵĞŶƚĂŶĚǁŝůůďĞŝŶĐŽƌƉŽƌĂƚĞĚďLJƌĞĨĞƌĞŶĐĞ͘

ϯͿ ƵƚŚŽƌŝnjĞĚZĞƉƌĞƐĞŶƚĂƟǀĞ͘ ^ƵƉƉůŝĞƌǁŝůůĂƐƐŝŐŶĂŶƵƚŚŽƌŝnjĞĚZĞƉƌĞƐĞŶƚĂƟǀĞƚŽ^ŽƵƌĐĞǁĞůůĨŽƌƚŚŝƐ ŐƌĞĞŵĞŶƚĂŶĚŵƵƐƚƉƌŽǀŝĚĞƉƌŽŵƉƚŶŽƟĐĞƚŽ^ŽƵƌĐĞǁĞůůŝĨƚŚĂƚƉĞƌƐŽŶŝƐĐŚĂŶŐĞĚ͘dŚĞƵƚŚŽƌŝnjĞĚ ZĞƉƌĞƐĞŶƚĂƟǀĞǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌ͗
x DĂŝŶƚĞŶĂŶĐĞĂŶĚŵĂŶĂŐĞŵĞŶƚŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͖
x dŝŵĞůLJƌĞƐƉŽŶƐĞƚŽĂůů^ŽƵƌĐĞǁĞůůĂŶĚWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŝŶƋƵŝƌŝĞƐ͖ĂŶĚ
x WĂƌƟĐŝƉĂƟŽŶŝŶƌĞǀŝĞǁƐǁŝƚŚ^ŽƵƌĐĞǁĞůů͘

^ŽƵƌĐĞǁĞůůΖƐƵƚŚŽƌŝnjĞĚZĞƉƌĞƐĞŶƚĂƟǀĞŝƐŝƚƐŚŝĞĨWƌŽĐƵƌĞŵĞŶƚKĸĐĞƌ.

4) WĞƌĨŽƌŵĂŶĐĞZĞǀŝĞǁƐ͘ Supplier will ƉĞƌĨŽƌŵĂŵŝŶŝŵƵŵŽĨŽŶĞƌĞǀŝĞǁǁŝƚŚ^ŽƵƌĐĞǁĞůůƉĞƌ ĂŐƌĞĞŵĞŶƚLJĞĂƌ ͘dŚĞƌĞǀŝĞǁǁŝůůĐŽǀĞƌƚƌĂŶƐĂĐƟŽŶƐƚŽWĂƌƟĐŝƉĂƟŶŐ ŶƟƟĞƐ͕ƉƌŝĐŝŶŐĂŶĚƚĞƌŵƐ͕
ĂĚŵŝŶŝƐƚƌĂƟǀĞĨĞĞƐ͕ƐĂůĞƐĚĂƚĂƌĞƉŽƌƚƐ͕ƉĞƌĨŽƌŵĂŶĐĞŝƐƐƵĞƐ͕ƐƵƉƉůLJ chain issues, customer issues, and ĂŶLJŽƚŚĞƌŶĞĐĞƐƐĂƌLJŝŶĨŽƌŵĂƟŽŶ͘

5) ^ĂůĞƐZĞƉŽƌƟŶŐZĞƋƵŝƌĞĚ͘ ^ƵƉƉůŝĞƌŝƐƌĞƋƵŝƌĞĚĂƐĂŵĂƚĞƌŝĂůĞůĞŵĞŶƚƚŽƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚƚŽ ƌĞƉŽƌƚĂůůĐŽŵƉůĞƚĞĚƚƌĂŶƐĂĐƟŽŶƐǁŝƚŚWĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐƵƟůŝnjŝŶŐƚŚŝƐŐƌĞĞŵĞŶƚ͘&ĂŝůƵƌĞƚŽ
provide complete and accurate ƌĞƉŽƌƚƐĂƐĚĞĮŶĞĚŚĞƌĞŝŶǁŝůůďĞĂŵĂƚĞƌŝĂůďƌĞĂĐŚŽĨƚŚĞŐƌĞĞŵĞŶƚ ĂŶĚ^ŽƵƌĐĞǁĞůůƌĞƐĞƌǀĞƐƚŚĞƌŝŐŚƚƚŽƉƵƌƐƵĞĂůůƌĞŵĞĚŝĞƐĂǀĂŝůĂďůĞĂƚůĂǁŝŶĐůƵĚŝŶŐĐĂŶĐĞůůĂƟŽŶŽĨ this Agreement.

6) ZĞƉŽƌƟŶŐZĞƋƵŝƌĞŵĞŶƚƐ͘ ^ƵƉƉůŝĞƌŵƵƐƚƉƌŽǀŝĚĞ^ŽƵƌĐĞǁĞůůĂŶĂĐƟǀŝƚLJƌĞƉŽƌƚŽĨĂůůƚƌĂŶƐĂĐƟŽŶƐ ĐŽŵƉůĞƚĞĚƵƟůŝnjŝŶŐƚŚŝƐŐƌĞĞŵĞŶƚ͘ZĞƉŽƌƚƐĂƌĞĚƵĞĂƚůĞĂƐƚŽŶĐĞĞĂĐŚĐĂůĞŶĚĂƌƋƵĂƌƚĞƌ;ZĞƉŽƌƟŶŐ WĞƌŝŽĚͿ͘ZĞƉŽƌƚƐŵƵƐƚďĞƌĞĐĞŝǀĞĚŶŽůĂƚĞƌƚŚĂŶϰϱĐĂůĞŶĚĂƌĚĂLJƐĂŌĞƌƚŚĞĞŶĚŽĨĞĂch calendar ƋƵĂƌƚĞƌ͘^ƵƉƉůŝĞƌŵĂLJƌĞƉŽƌƚŽŶĂŵŽƌĞĨƌĞƋƵĞŶƚďĂƐŝƐŝŶŝƚƐĚŝƐĐƌĞƟŽŶ͘ZĞƉŽƌƚƐŵƵƐƚďĞƉƌŽǀŝĚĞĚ ƌĞŐĂƌĚůĞƐƐŽĨƚŚĞĂŵŽƵŶƚŽĨĐŽŵƉůĞƚĞĚƚƌĂŶƐĂĐƟŽŶƐĚƵƌŝŶŐƚŚĂƚƋƵĂƌƚĞƌ;ŝ͘Ğ͕͘ŝĨƚŚĞƌĞĂƌĞŶŽƐĂůĞƐ͕ Supplier must submit a ƌĞƉŽƌƚŝŶĚŝĐĂƟŶŐŶŽƐĂůĞƐǁĞƌĞŵĂĚĞͿ͘

dŚĞZĞƉŽƌƚŵƵƐƚĐŽŶƚĂŝŶƚŚĞĨŽůůŽǁŝŶŐĮĞůĚƐ͗
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJEĂŵĞ;Ğ͘Ő͕͘ŝƚLJŽĨ^ƚĂƉůĞƐ,ŝŐŚǁĂLJĞƉĂƌƚŵĞŶƚͿ͖
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJWŚLJƐŝĐĂů^ƚƌĞĞƚĚĚƌĞƐƐ͖
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŝƚLJ͖
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ^ƚĂƚĞͬWƌŽǀŝŶĐĞ͖
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŝƉͬWŽƐƚĂůŽĚĞ͖
x ^ŽƵƌĐĞǁĞůůWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJAccount EƵŵďĞƌ͖
x dƌĂŶƐĂĐƟŽŶĞƐĐƌŝƉƟŽŶ͖
x dƌĂŶƐĂĐƟŽŶWƵƌĐŚĂƐĞĚWƌŝĐĞ͖
x ^ŽƵƌĐĞǁĞůůĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƉƉůŝĞĚ͖ĂŶĚ
x ĂƚĞdƌĂŶƐĂĐƟŽŶǁĂƐŝŶǀŽŝĐĞĚͬƐĂůĞǁĂƐƌĞĐŽŐŶŝnjĞĚĂƐƌĞǀĞŶƵĞďLJ^ƵƉƉůŝĞƌ͘

/Ĩcollected by Supplier, ƚŚĞZĞƉŽƌƚŵĂLJŝŶĐůƵĚĞƚŚĞĨŽůůŽǁŝŶŐĮĞůĚƐĂƐĂǀĂŝůĂďůĞ͗ 
 

!





 




Page 101 of 1283 ends

041525-FNR

v052824 9

x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŽŶƚĂĐƚEĂŵĞ͖
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŽŶƚĂĐƚ
ŵĂŝůĚĚƌĞƐƐ͖
x WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŽŶƚĂĐƚdĞůĞƉŚŽŶĞEƵŵďĞƌ͖

7) ĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞ͘ /ŶĐŽŶƐŝĚĞƌĂƟŽŶĨŽƌƚŚĞƐƵƉƉŽƌƚĂŶĚƐĞƌǀŝĐĞƐƉƌŽǀŝĚĞĚďLJ^ŽƵƌĐĞǁĞůů͕^ƵƉƉůŝĞƌ ǁŝůůƉĂLJĂŶĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƚŽ^ŽƵƌĐĞǁĞůůŽŶĂůůĐŽŵƉůĞƚĞĚƚƌĂŶƐĂĐƟŽŶƐƚŽWĂƌƟĐŝƉĂƟŶŐ ŶƟƟĞƐ
ƵƟůŝnjŝŶŐƚŚŝƐŐƌĞĞŵĞŶƚ͘^ƵƉƉůŝĞƌǁŝůůŝŶĐůƵĚĞŝƚƐĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞǁŝƚŚin its proposed pricing. ^ƵƉƉůŝĞƌŵĂLJŶŽƚĚŝƌĞĐƚůLJĐŚĂƌŐĞWĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐƚŽŽīƐĞƚƚŚĞĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞ͘

8) &ĞĞĂůĐƵůĂƟŽŶ͘ ^ƵƉƉůŝĞƌ͛ƐĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƉĂLJĂďůĞƚŽ^ŽƵƌĐĞǁĞůůǁŝůůďĞĐĂůĐƵůĂƚĞĚĂƐĂƐƚĂƚĞĚ ƉĞƌĐĞŶƚĂŐĞ;ůŝƐƚĞĚŝŶ^ƵƉƉůŝĞƌ͛ƐWƌŽƉŽƐĂůͿŽĨĂůůĐŽŵƉůĞƚĞĚƚƌĂŶƐĂĐƟŽŶƐƵƟůŝnjŝŶŐƚŚŝƐDĂƐƚĞƌ ŐƌĞĞŵĞŶƚǁŝƚŚŝŶƚŚĞƉƌĞĐĞĚŝŶŐZĞƉŽƌƟŶŐWĞƌŝŽĚ͘ For certain categories, a ŇĂƚĨĞĞ may be proposed. dŚĞĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞǁŝůůďĞƐƚĂƚĞĚŝŶ^ƵƉƉůŝĞƌ͛ƐWƌŽƉŽƐĂů.

9) &ĞĞZĞŵŝƩĂŶĐĞ͘ ^ƵƉƉůŝĞƌǁŝůůƌĞŵŝƚĨĞĞƚŽ^ŽƵƌĐĞǁĞůůŶŽůĂƚĞƌƚŚĂŶϰϱĐĂůĞŶĚĂƌĚĂLJƐĂŌĞƌƚŚĞĐůŽƐĞ ŽĨƚŚĞƉƌĞĐĞĚŝŶŐĐĂůĞŶĚĂƌƋƵĂƌƚĞƌŝŶĐŽŶũƵŶĐƟŽŶǁŝƚŚ^ƵƉƉůŝĞƌ͛ƐZĞƉŽƌƟŶŐWĞƌŝŽĚŽďůŝŐĂƟŽŶƐ ĚĞĮŶĞĚŚĞƌĞŝŶ͘WĂLJŵĞŶƚƐƐŚŽƵůĚŶŽƚĞƚŚĞ^ƵƉƉůŝĞƌ͛ƐŶĂŵĞĂŶĚ^ŽƵƌĐĞǁĞůů-assigned Agreement ŶƵŵďĞƌŝŶƚŚĞŵĞŵŽ͖ĂŶĚŵƵƐƚďĞĞŝƚŚĞƌŵĂŝůĞĚto Sourcewell ĂďŽǀĞ͞ƩŶ͗ĐĐŽƵŶƚƐZĞĐĞŝǀĂďůĞ͟Žƌ ƌĞŵŝƩĞĚĞůĞĐƚƌŽŶŝĐĂůůLJƚŽ^ŽƵƌĐĞǁĞůů͛ƐďĂŶŬŝŶŐŝŶƐƟƚƵƟŽŶƉĞƌ^ŽƵƌĐĞǁĞůů͛Ɛ&ŝŶĂŶĐĞĚĞƉĂƌƚŵĞŶƚ ŝŶƐƚƌƵĐƟŽŶƐ͘

10) EŽŶĐŽŵƉůŝĂŶĐĞ͘ Sourcewell reserves the right to seek all remedies available ĂƚůĂǁĨŽƌƵŶƉĂŝĚŽƌ ƵŶĚĞƌƉĂŝĚĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƐĚƵĞƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘&ĂŝůƵƌĞƚŽƌĞŵŝƚƉĂLJŵĞŶƚ͕ĚĞůŝŶƋƵĞŶƚ payments͕ƵŶĚĞƌƉĂLJŵĞŶƚƐ͕ŽƌŽƚŚĞƌĚĞǀŝĂƟŽŶƐĨƌŽŵƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨƚŚŝƐŐƌĞĞŵĞŶƚŵĂLJďĞ ĚĞĞŵĞĚĂŵĂƚĞƌŝĂůďƌĞĂĐŚĂŶĚŵĂLJƌĞƐƵůƚŝŶĐĂŶĐĞůůĂƟŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚĂŶĚĚŝƐďĂƌŵĞŶƚĨƌŽŵ ĨƵƚƵƌĞŐƌĞĞŵĞŶƚƐ͘

11) ƵĚŝƚZĞƋƵŝƌĞŵĞŶƚƐ͘ Pursuant to Minn. Stat. Α 16C.05, subdivision 5, the books, records, ĚŽĐƵŵĞŶƚƐ͕ĂŶĚĂĐĐŽƵŶƟŶŐƉƌŽĐĞĚƵƌĞƐĂŶĚƉƌĂĐƟĐĞƐƌĞůĞǀĂŶƚƚŽƚŚŝƐŐƌĞĞŵĞŶƚĂƌĞƐƵďũĞĐƚƚŽ ĞdžĂŵŝŶĂƟŽŶďLJ^ŽƵƌĐĞǁĞůůand ƚŚĞDŝŶŶĞƐŽƚĂ^ƚĂƚĞƵĚŝƚŽƌĨŽƌĂŵŝŶŝŵƵŵŽĨƐŝdžLJĞĂƌƐĨƌŽŵƚŚĞĞŶĚ ŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘^ƵƉƉůŝĞƌĂŐƌĞĞƐƚŽĨƵůůLJĐŽŽƉĞƌĂƚĞǁŝƚŚ^ŽƵƌĐĞǁĞůůŝŶĂƵĚŝƟŶŐƚƌĂŶƐĂĐƟŽŶƐƵŶĚĞƌ ƚŚŝƐŐƌĞĞŵĞŶƚƚŽĞŶƐƵƌĞĐŽŵƉůŝĂŶĐĞǁŝƚŚƉƌŝĐŝŶŐƚĞƌŵƐ͕ĐŽƌƌĞĐƚĐĂůĐƵůĂƟŽŶĂŶĚƌĞŵŝƩĂŶĐĞŽĨ ĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƐ͕ĂŶĚǀĞƌŝĮĐĂƟŽŶ ŽĨƚƌĂŶƐĂĐƟŽŶƐĂƐŵĂLJďĞƌĞƋƵĞƐƚĞĚďLJĂWĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJŽƌ
Sourcewell.

12) ƐƐŝŐŶŵĞŶƚ͕dƌĂŶƐĨĞƌ͕ĂŶĚĚŵŝŶŝƐƚƌĂƟǀĞŚĂŶŐĞƐ͘^ƵƉƉůŝĞƌŵĂLJŶŽƚĂƐƐŝŐŶŽƌŽƚŚĞƌǁŝƐĞƚƌĂŶƐĨĞƌŝƚƐ ƌŝŐŚƚƐŽƌŽďůŝŐĂƟŽŶƐƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚǁŝƚŚŽƵƚƚŚĞƉƌŝŽƌǁƌŝ ƩĞŶĐŽŶƐĞŶƚŽĨ^ŽƵƌĐĞǁĞůů͘^ƵĐŚ
consent will not be unreasonably withheld. Sourcewell reserves the right to unilaterally assign all or ƉŽƌƟŽŶƐŽĨƚŚŝƐŐƌĞĞŵĞŶƚǁŝƚŚŝŶŝƚƐƐŽůĞĚŝƐĐƌĞƟŽŶƚŽĂĚĚƌĞƐƐĐŽƌƉŽƌĂƚĞƌĞƐƚƌƵĐƚƵƌŝŶŐƐ͕ŵĞƌŐĞƌƐ͕ ĂĐƋƵŝƐŝƟŽŶƐ͕ŽƌŽƚŚĞƌĐŚĂŶŐĞƐƚŽƚŚĞZesponsible Party and named in the Agreement. Any prohibited assignment is ŝŶǀĂůŝĚ͘hƉŽŶƌĞƋƵĞƐƚ ^ŽƵƌĐĞǁĞůůŵĂLJŵĂŬĞĂĚŵŝŶŝƐƚƌĂƟǀĞĐŚĂŶŐĞƐƚŽĂŐƌĞĞŵĞŶƚ ĚŽĐƵŵĞŶƚĂƟŽŶƐƵĐŚĂƐŶĂŵĞĐŚĂŶŐĞƐ͕ĂĚĚƌĞƐƐĐŚĂŶŐĞƐ͕ĂŶĚŽƚŚĞƌŶŽŶ-material updates as determined ǁŝƚŚŝŶŝƚƐƐŽůĞĚŝƐĐƌĞƟŽŶ͘

ϭϯͿ ŵĞŶĚŵĞŶƚƐ͘ ŶLJŵĂƚĞƌŝĂůĐŚĂŶŐĞƚŽƚŚŝƐŐƌĞĞŵĞŶƚŵƵƐƚďĞĞdžĞĐƵƚĞĚŝŶǁƌŝƟŶŐƚŚƌŽƵŐŚĂŶ ĂŵĞŶĚŵĞŶƚĂŶĚǁŝůůŶŽƚďĞĞīĞĐƟǀĞƵŶƟůŝƚŚĂƐďĞĞŶĚƵůLJĞdžĞĐƵƚĞĚďLJƚŚĞƉĂƌƟĞƐ.


 

!





 




Page 102 of 1283 ends

041525-FNR

v052824 10

14) tĂŝǀĞƌ͘ Failure by Sourcewell to ĞŶĨŽƌĐĞany right under this Agreement will not be deemed a waiver ŽĨƐƵĐŚƌŝŐŚƚŝŶƚŚĞĞǀĞŶƚŽĨƚŚĞĐŽŶƟŶƵĂƟŽŶŽƌƌĞƉĞƟƟŽŶŽĨƚŚĞĐŝƌĐƵŵƐƚĂŶĐĞƐŐŝǀŝŶŐƌŝƐĞƚŽƐƵĐŚ right.

15) ŽŵƉůĞƚĞŐƌĞĞŵĞŶƚ͘ dŚŝƐŐƌĞĞŵĞŶƚƌĞƉƌĞƐĞŶƚƐƚŚĞĐŽŵƉůĞƚĞĂŐƌĞĞŵĞŶƚďĞƚǁĞĞŶƚŚĞƉĂƌƟĞƐ ĨŽƌ ƚŚĞƐĐŽƉĞĂƐĚĞĮŶĞĚŚĞƌĞŝŶ͘^ƵƉƉůŝĞƌĂŶĚ^ŽƵƌĐĞǁĞůůŵĂLJĞŶƚĞƌŝŶƚŽƐĞƉĂƌĂƚĞǁƌŝƩĞŶĂŐƌĞĞŵĞŶƚƐ ƌĞůĂƟŶŐƐƉĞĐŝĮĐĂůůLJƚŽƚƌĂŶƐĂĐƟŽŶƐŽƵƚƐŝĚĞŽĨƚŚĞƐĐŽƉĞŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

16) ZĞůĂƟŽŶƐŚŝƉŽĨ^ŽƵƌĐĞǁĞůůĂŶĚ^ƵƉƉůŝĞƌ͘ dŚŝƐŐƌĞĞŵĞŶƚĚŽĞƐŶŽƚĐƌĞĂƚĞĂƉĂƌƚŶĞƌƐŚŝƉ͕ũŽŝŶƚ ǀĞŶƚƵƌĞ͕ŽƌĂŶLJŽƚŚĞƌƌĞůĂƟŽŶƐŚŝƉƐƵĐŚĂƐĞŵƉůŽLJĞĞ͕ŝŶĚĞƉĞŶĚĞŶƚĐŽŶƚƌĂĐƚŽƌ͕ŵĂƐƚĞƌ-servant, or principal-agent.

17) /ŶĚĞŵŶŝĮĐĂƟŽŶ͘ ^ƵƉƉůŝĞƌŵƵƐƚŝŶĚĞŵŶŝĨLJ͕ĚĞĨĞŶĚ͕ƐĂǀĞ͕ĂŶĚŚŽůĚ^ŽƵƌĐĞǁĞůů͕ŝŶĐůƵĚŝŶŐƚŚĞŝƌĂŐĞŶƚƐ ĂŶĚĞŵƉůŽLJĞĞƐ͕ŚĂƌŵůĞƐƐĨƌŽŵĂŶLJĐůĂŝŵƐŽƌĐĂƵƐĞƐŽĨĂĐƟŽŶ͕ŝŶĐůƵĚŝŶŐĂƩŽƌŶĞLJƐ͛ĨĞĞƐŝŶĐƵƌƌĞĚďLJ ^ŽƵƌĐĞǁĞůů͕ĂƌŝƐŝŶŐŽƵƚŽĨĂŶLJĂĐƚŽƌŽŵŝƐƐŝŽŶŝŶƚŚĞƉĞƌĨŽƌŵĂŶĐĞŽĨƚŚŝƐ Agreement by the Supplier ŽƌŝƚƐĂŐĞŶƚƐŽƌĞŵƉůŽLJĞĞƐ͖ƚŚŝƐŝŶĚĞŵŶŝĮĐĂƟŽŶŝŶĐůƵĚĞƐŝŶũƵƌLJŽƌĚĞĂƚŚƚŽƉĞƌƐŽŶ;ƐͿŽƌƉƌŽƉĞƌƚLJ ĂůůĞŐĞĚƚŽŚĂǀĞďĞĞŶĐĂƵƐĞĚďLJƐŽŵĞĚĞĨĞĐƚŝŶĚĞƐŝŐŶ͕ĐŽŶĚŝƟŽŶ͕ŽƌƉĞƌĨŽƌŵĂŶĐĞŽĨ/ŶĐůƵĚĞĚ ^ŽůƵƟŽŶƐƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘^ŽƵƌĐĞǁĞůů͛ƐƌĞƐƉŽŶƐŝďŝůŝƚLJǁŝůůďĞŐŽǀĞƌŶĞĚďLJƚŚĞ^ƚĂƚĞŽĨ DŝŶŶĞƐŽƚĂ͛ƐdŽƌƚ>ŝĂďŝůŝƚLJĐƚ;DŝŶŶĞƐŽƚĂ^ƚĂƚƵƚĞƐŚĂƉƚĞƌϰϲϲͿĂŶĚŽƚŚĞƌĂƉƉůŝĐĂďůĞůĂǁ͘

18) ĂƚĂWƌĂĐƟĐĞƐ͘ ^ƵƉƉůŝĞƌĂŶĚ^ŽƵƌĐĞǁĞůůĂĐŬŶŽǁůĞĚŐĞ^ŽƵƌĐĞǁĞůůŝƐƐƵďũĞĐƚƚŽƚŚĞDŝŶŶĞƐŽƚĂ 'ŽǀĞƌŶŵĞŶƚĂƚĂWƌĂĐƟĐĞƐĐƚ͕DŝŶŶĞƐŽƚĂ^ƚĂƚƵƚĞƐŚĂƉƚĞƌϭϯ͘ƐŝƚĂƉƉůŝĞƐƚŽĂůůĚĂƚĂĐƌĞĂƚĞĚĂŶĚ ŵĂŝŶƚĂŝŶĞĚŝŶƉĞƌĨŽƌŵĂŶĐĞŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͕^ƵƉƉůŝĞƌŵĂLJďĞƐƵďũĞĐƚƚŽƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨƚŚŝƐ chapter.

19) 'ƌĂŶƚŽĨ>ŝĐĞŶƐĞ͘
a) ƵƌŝŶŐƚŚĞƚĞƌŵŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͗
i) ^ƵƉƉůŝĞƌWƌŽŵŽƟŽŶ͘ Sourcewell grants to Supplier a royalty-ĨƌĞĞ͕ǁŽƌůĚǁŝĚĞ͕ŶŽŶ-exclusive ƌŝŐŚƚĂŶĚůŝĐĞŶƐĞƚŽƵƐĞƚŚĞƚƌĂĚĞŵĂƌŬ;ƐͿƉƌŽǀŝĚĞĚƚŽ^ƵƉƉůŝĞƌďLJ^ŽƵƌĐĞǁĞůůŝŶĂĚǀĞƌƟƐŝŶŐ͕ ƉƌŽŵŽƟŽŶĂůŵĂƚĞƌŝĂůƐ͕ĂŶĚŝŶĨŽƌŵĂƟŽŶĂůƐŝƚĞƐĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨŵĂƌŬĞƟŶŐ^ŽƵƌĐĞǁĞůů͛Ɛ Agreement with Supplier.

ii) ^ŽƵƌĐĞǁĞůůWƌŽŵŽƟŽŶ͘ Supplier grants to Sourcewell a royalty-ĨƌĞĞ͕ǁŽƌůĚǁŝĚĞ͕ŶŽŶ- ĞdžĐůƵƐŝǀĞƌŝŐŚƚĂŶĚůŝĐĞŶƐĞƚŽƵƐĞ^ƵƉƉůŝĞƌ͛ƐƚƌĂĚĞŵĂƌŬƐŝŶĂĚǀĞƌƟƐŝŶŐ͕ƉƌŽŵŽƟŽŶĂů ŵĂƚĞƌŝĂůƐ͕ĂŶĚŝŶĨŽƌŵĂƟŽŶĂůƐŝƚĞƐĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨŵĂƌŬĞƟŶŐ^ƵƉƉůŝĞƌ͛ƐŐƌĞĞŵĞŶƚǁŝƚŚ Sourcewell.

b) >ŝŵŝƚĞĚZŝŐŚƚŽĨ^ƵďůŝĐĞŶƐĞ͘ dŚĞƌŝŐŚƚĂŶĚůŝĐĞŶƐĞŐƌĂŶƚĞĚŚĞƌĞŝŶŝŶĐůƵĚĞƐĂůŝŵŝƚĞĚƌŝŐŚƚŽĨĞĂĐŚ ƉĂƌƚLJƚŽŐƌĂŶƚƐƵďůŝĐĞŶƐĞƐƚŽƚŚĞŝƌƌĞƐƉĞĐƟǀĞƐƵďƐŝĚŝĂƌŝĞƐ͕ĚŝƐƚƌŝďƵƚŽƌƐ͕ĚĞĂůĞƌƐ͕ƌĞƐĞůůĞƌƐ͕ ŵĂƌŬĞƟŶŐƌĞƉƌĞƐĞŶƚĂƟǀĞƐ͕ƉĂƌƚŶĞƌƐ͕ŽƌĂŐĞŶƚƐ;ĐŽůůĞĐƟǀĞůLJ͞WĞƌŵŝƩĞĚ^ƵďůŝĐĞŶƐĞĞƐ͟ͿŝŶ ĂĚǀĞƌƟƐŝŶŐ͕ƉƌŽŵŽƟŽŶĂů͕ŽƌŝŶĨŽƌŵĂƟŽŶĂůŵĂƚĞƌŝĂůƐĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨŵĂƌŬĞƟŶŐƚŚĞWĂƌƟĞƐ͛ ƌĞůĂƟŽŶƐŚŝƉ͘ŶLJƐƵďůŝĐĞŶƐĞŐƌĂŶƚĞĚǁŝůůďĞƐƵďũĞĐƚƚŽƚŚĞƚĞƌŵƐĂŶĚĐŽŶĚŝƟŽŶƐŽĨƚŚŝƐƌƟĐůĞ͘

ĂĐŚƉĂƌƚLJǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌĂŶLJďƌĞĂĐŚŽĨƚŚŝƐƐĞĐƟŽŶ ďLJĂŶLJŽĨƚŚĞŝƌƌĞƐƉĞĐƟǀĞ sublicensees.

c) hƐĞ͖YƵĂůŝƚLJŽŶƚƌŽů͘
i) EĞŝƚŚĞƌƉĂƌƚLJŵĂLJĂůƚĞƌƚŚĞŽƚŚĞƌƉĂƌƚLJ͛ƐƚƌĂĚĞŵĂƌŬƐĨƌŽŵƚŚĞĨŽƌŵƉƌŽǀŝĚĞĚĂŶĚŵƵƐƚ ĐŽŵƉůLJǁŝƚŚƌĞŵŽǀĂůƌĞƋƵĞƐƚƐĂƐƚŽƐƉĞĐŝĮĐƵƐĞƐŽĨŝƚƐƚƌĂĚĞŵĂƌŬƐŽƌůŽŐŽƐ. 
 

!





 




Page 103 of 1283 ends

041525-FNR

v052824 11

ii)
ĂĐŚƉĂƌƚLJĂŐƌĞĞƐƚŽƵƐĞ͕ĂŶĚƚŽĐĂƵƐĞŝƚƐWĞƌŵŝƩĞĚ^ƵďůŝĐĞŶƐĞĞƐƚŽƵƐĞ͕ƚŚĞŽƚŚĞƌƉĂƌƚLJ͛Ɛ ƚƌĂĚĞŵĂƌŬƐŽŶůLJŝŶŐŽŽĚĨĂŝƚŚĂŶĚŝŶĂĚŝŐŶŝĮĞĚŵĂŶŶĞƌĐŽŶƐŝƐƚĞŶƚǁŝƚŚƐƵĐŚƉĂƌƚLJ͛ƐƵƐĞŽĨ ƚŚĞƚƌĂĚĞŵĂƌŬƐ͘
ĂĐŚƉĂƌƚLJŵĂLJŵĂŬĞǁƌŝƩĞŶŶŽƟĐĞƚŽƚŚĞŽƚŚĞƌƌĞŐĂƌĚŝŶg misuse under ƚŚŝƐƐĞĐƟŽŶ͘dŚĞŽīĞŶĚŝŶŐƉĂƌƚLJǁŝůůŚĂǀĞϯϬĚĂLJƐŽĨƚŚĞĚĂƚĞŽĨƚŚĞǁƌŝƩĞŶŶŽƟĐĞƚŽĐƵƌĞ ƚŚĞŝƐƐƵĞŽƌƚŚĞůŝĐĞŶƐĞͬƐƵďůŝĐĞŶƐĞǁŝůůďĞƚĞƌŵŝŶĂƚĞĚ͘

d) dĞƌŵŝŶĂƟŽŶ͘ hƉŽŶƚŚĞƚĞƌŵŝŶĂƟŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚĨŽƌĂŶLJƌĞĂƐŽŶ͕ĞĂĐŚƉĂƌƚLJ͕ŝŶĐůƵĚŝŶŐ WĞƌŵŝƩĞĚ^ƵďůŝĐĞŶƐĞĞƐ͕ǁŝůůŚĂǀĞϯϬĚĂLJƐƚŽƌĞŵŽǀĞĂůůdƌĂĚĞŵĂƌŬƐĨƌŽŵƐŝŐŶĂŐĞ͕ǁĞďƐŝƚĞƐ͕ĂŶĚ ƚŚĞůŝŬĞďĞĂƌŝŶŐƚŚĞŽƚŚĞƌƉĂƌƚLJ͛ƐŶĂŵĞŽƌůŽŐŽ;ĞdžĐĞƉƟŶŐ^ŽƵƌĐĞǁĞůů͛ƐƉƌĞ-printed ĐĂƚĂůŽŐŽĨ ƐƵƉƉůŝĞƌƐǁŚŝĐŚŵĂLJďĞƵƐĞĚƵŶƟůƚŚĞŶĞdžƚƉƌŝŶƟŶŐͿ͘^ƵƉƉůŝĞƌŵƵƐƚƌĞƚƵƌŶĂůůŵĂƌŬĞƟŶŐĂŶĚ ƉƌŽŵŽƟŽŶĂůŵĂƚĞƌŝĂůƐ͕ŝŶĐůƵĚŝŶŐƐŝŐŶĂŐĞ͕ƉƌŽǀŝĚĞĚďLJ^ŽƵƌĐĞǁĞůů͕ŽƌĚŝƐƉŽƐĞŽĨŝƚĂĐĐŽƌĚŝŶŐƚŽ ^ŽƵƌĐĞǁĞůů͛ƐǁƌŝƩĞŶĚŝƌĞĐƟŽŶƐ͘

20) sĞŶƵĞĂŶĚ'ŽǀĞƌŶŝŶŐůĂǁďĞƚǁĞĞŶ^ŽƵƌĐĞǁĞůůĂŶĚ^ƵƉƉůŝĞƌKŶůLJ͘ dŚĞƐƵďƐƚĂŶƟǀĞĂŶĚƉƌŽĐĞĚƵƌĂů ůĂǁƐŽĨƚŚĞ^ƚĂƚĞŽĨDŝŶŶĞƐŽƚĂǁŝůůŐŽǀĞƌŶƚŚŝƐŐƌĞĞŵĞŶƚďĞƚǁĞĞŶ^ŽƵƌĐĞǁĞůůĂŶĚ^ƵƉƉůŝĞƌ ͘sĞŶƵĞ ĨŽƌĂůůůĞŐĂůƉƌŽĐĞĞĚŝŶŐƐĂƌŝƐŝŶŐŽƵƚŽĨƚŚŝƐŐƌĞĞŵĞŶƚďĞƚǁĞĞŶ^ŽƵƌĐĞǁĞůůĂŶĚ^ƵƉƉůŝĞƌǁŝůůďĞŝŶ ĐŽƵƌƚŽĨĐŽŵƉĞƚĞŶƚũƵƌŝƐĚŝĐƟŽŶǁŝƚŚŝŶƚŚĞ^ƚĂƚĞŽĨDŝŶŶĞƐŽƚĂ͘dŚŝƐƐĞĐƟŽŶĚŽĞƐŶŽƚĂƉƉůLJƚŽĂŶLJ ĚŝƐƉƵƚĞďĞƚǁĞĞŶ^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ͘dŚŝƐŐƌĞĞŵĞŶƚƌĞƐĞƌǀĞƐƚŚĞƌŝŐŚƚĨŽƌ^ƵƉƉůŝĞƌĂŶĚ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJƚŽŶĞŐŽƟĂƚĞƚŚŝƐƚĞƌŵƚŽǁŝƚŚŝŶĂŶLJƚƌĂŶƐĂĐƟŽŶĚŽĐƵŵĞŶƚƐ.

21) ^ĞǀĞƌĂďŝůŝƚLJ͘ /ĨĂŶLJƉƌŽǀŝƐŝŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚŝƐĨŽƵŶĚďLJĂĐŽƵƌƚŽĨĐŽŵƉĞƚĞŶƚũƵƌŝƐĚŝĐƟŽŶƚŽďĞ ŝůůĞŐĂů͕ƵŶĞŶĨŽƌĐĞĂďůĞ͕ŽƌǀŽŝĚƚŚĞŶďŽƚŚƉĂƌƟĞƐǁŝůůďĞƌĞůŝĞǀĞĚĨƌŽŵĂůůŽďůŝŐĂƟŽŶƐĂƌŝƐŝŶŐĨƌŽŵƚŚĂƚ ƉƌŽǀŝƐŝŽŶ͘/ĨƚŚĞƌĞŵĂŝŶĚĞƌŽĨƚŚŝƐŐƌĞĞŵĞŶƚŝƐĐĂƉĂďůĞŽĨďĞŝŶŐƉĞƌĨŽƌŵĞĚ͕ŝƚǁŝůůŶŽƚďĞĂīĞĐƚĞĚ ďLJƐƵĐŚĚĞƚĞƌŵŝŶĂƟŽŶŽƌĮŶĚŝŶŐĂŶĚŵƵƐƚďĞĨƵůůLJƉĞƌĨŽƌŵĞĚ͘ 22) /ŶƐƵƌĂŶĐĞŽǀĞƌĂŐĞ͘ At its own expense, Supplier must maintain valid insurance policy(ies) during ƚŚĞƉĞƌĨŽƌŵĂŶĐĞŽĨƚŚŝƐŐƌĞĞŵĞŶƚǁŝƚŚŝŶƐƵƌĂŶĐĞĐŽŵƉĂŶLJ;ŝĞƐͿůŝĐĞŶƐĞĚŽƌĂƵƚŚŽƌŝnjĞĚƚŽĚŽ ďƵƐŝŶĞƐƐŝŶƚŚĞ^ƚĂƚĞŽĨDŝŶŶĞƐŽƚĂŚĂǀŝŶŐĂŶ͞D
^d͟ƌĂƟŶŐŽĨ- ŽƌďĞƩĞƌ͕ǁŝƚŚĐŽverage and
ůŝŵŝƚƐŽĨŝŶƐƵƌĂŶĐĞŶŽƚůĞƐƐƚŚĂŶƚŚĞĨŽůůŽǁŝŶŐ͗

a) ŽŵŵĞƌĐŝĂů'ĞŶĞƌĂů>ŝĂďŝůŝƚLJ/ŶƐƵƌĂŶĐĞ͘ ^ƵƉƉůŝĞƌǁŝůůŵĂŝŶƚĂŝŶŝŶƐƵƌĂŶĐĞĐŽǀĞƌŝŶŐŝƚƐŽƉĞƌĂƟŽŶƐ͕ ǁŝƚŚĐŽǀĞƌĂŐĞŽŶĂŶŽĐĐƵƌƌĞŶĐĞďĂƐŝƐ͕ĂŶĚŵƵƐƚďĞƐƵďũĞĐƚƚŽƚĞƌŵƐŶŽůĞƐƐďƌŽĂĚƚŚĂŶƚŚĞ /ŶƐƵƌĂŶĐĞ^ĞƌǀŝĐĞƐKĸĐĞ;͞/^K͟ͿŽŵŵĞƌĐŝĂů'ĞŶĞƌĂů>ŝĂďŝůŝƚLJ&Žƌŵ'ϬϬϬϭ;ϮϬϬϭŽƌŶĞǁĞƌ ĞĚŝƟŽŶͿ͕ŽƌĞƋƵŝǀĂůĞŶƚ͘ƚĂŵŝŶŝŵƵŵ͕ĐŽǀĞƌĂŐĞŵƵƐƚŝŶĐůƵĚĞůŝĂďŝůŝƚLJĂƌŝƐŝŶŐĨƌŽŵƉƌĞŵŝƐĞƐ͕ ŽƉĞƌĂƟŽŶƐ͕ďŽĚŝůLJŝŶũƵƌLJĂŶĚƉƌŽƉĞƌƚLJĚĂŵĂŐĞ͕ŝŶĚĞƉĞŶĚĞŶƚĐŽŶƚƌĂĐƚŽƌƐ͕ƉƌŽĚƵĐƚƐ-completed ŽƉĞƌĂƟŽŶƐŝŶĐůƵĚŝŶŐĐŽŶƐƚƌƵĐƟŽŶĚĞĨĞĐƚ͕ĐŽŶƚƌĂĐtual liability, blanket contractual liability, and ƉĞƌƐŽŶĂůŝŶũƵƌLJĂŶĚĂĚǀĞƌƟƐŝŶŐŝŶũƵƌLJ͘ůůƌĞƋƵŝƌĞĚůŝŵŝƚƐ͕ƚĞƌŵƐĂŶĚĐŽŶĚŝƟŽŶƐŽĨĐŽǀĞƌĂŐĞŵƵƐƚ ďĞŵĂŝŶƚĂŝŶĞĚĚƵƌŝŶŐƚŚĞƚĞƌŵŽĨƚŚŝƐAgreement.
x
Ψϭ͕ϱϬϬ͕ϬϬϬĞĂĐŚŽĐĐƵƌƌĞŶĐĞŽĚŝůLJ/ŶũƵƌLJĂŶĚWƌŽƉĞƌƚLJĂŵĂŐĞ x Ψϭ͕ϱϬϬ͕ϬϬϬWĞƌƐŽŶĂůĂŶĚĚǀĞƌƟƐŝŶŐ/ŶũƵƌLJ
x ΨϮ͕ϬϬϬ͕ϬϬϬĂŐŐƌĞŐĂƚĞĨŽƌƉƌŽĚƵĐƚƐůŝĂďŝůŝƚLJ-ĐŽŵƉůĞƚĞĚŽƉĞƌĂƟŽŶƐ x ΨϮ͕ϬϬϬ͕ϬϬϬŐĞŶĞƌĂůĂŐŐƌĞŐĂƚĞ

b) ĞƌƟĮĐĂƚĞƐŽĨ/ŶƐƵƌĂŶĐĞ͘ WƌŝŽƌƚŽĞdžĞĐƵƟŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͕^ƵƉƉůŝĞƌŵƵƐƚĨƵƌŶŝƐŚƚŽ ^ŽƵƌĐĞǁĞůůĂĐĞƌƟĮĐĂƚĞŽĨŝŶƐƵƌĂŶĐĞ͕ĂƐĞǀŝĚĞŶĐĞŽĨƚŚĞŝŶƐƵƌĂŶĐĞƌĞƋƵŝƌĞĚƵŶĚĞƌƚŚŝƐ ŐƌĞĞŵĞŶƚ͘WƌŝŽƌƚŽĞdžƉŝƌĂƟŽŶŽĨƚŚĞƉŽůŝĐLJ;ŝĞƐͿ͕ƌĞŶĞǁĂůĐĞƌƟĮĐĂƚĞƐŵƵƐƚďĞŵĂŝůĞĚƚŽ Sourcewell, 202 12th Street Northeast, P .O. Box 219, Staples, MN 56479 or provided to in an ĂůƚĞƌŶĂƟǀĞŵĂŶŶĞƌĂƐĚŝƌĞĐƚĞĚďLJ^ŽƵƌĐĞǁĞůů͘dŚĞĐĞƌƟĮĐĂƚĞƐŵƵƐƚďĞƐŝŐŶĞĚďLJĂƉĞƌƐŽŶ 
 

!





 




Page 104 of 1283 ends

041525-FNR

v052824 12

ĂƵƚŚŽƌŝnjĞĚďLJƚŚĞŝŶƐƵƌĞƌ;ƐͿƚŽďŝŶĚĐŽǀĞƌĂŐĞŽŶƚŚĞŝƌďĞŚĂůĨ͘&ĂŝůƵƌĞŽĨ^ƵƉƉůŝĞƌƚŽŵĂŝŶƚĂŝŶƚŚĞ ƌĞƋƵŝƌĞĚŝŶƐƵƌĂŶĐĞĂŶĚĚŽĐƵŵĞŶƚĂƟŽŶŵĂLJĐŽŶƐƟƚƵƚĞĂŵĂƚĞƌŝĂůďƌĞĂĐŚ͘

c) ĚĚŝƟŽŶĂů/ŶƐƵƌĞĚ
ŶĚŽƌƐĞŵĞŶƚĂŶĚWƌŝŵĂƌLJĂŶĚEŽŶ-ĐŽŶƚƌŝďƵƚŽƌLJ/ŶƐƵƌĂŶĐĞůĂƵƐĞ͘ Supplier ĂŐƌĞĞƐƚŽůŝƐƚ^ŽƵƌĐĞǁĞůů͕ŝŶĐůƵĚŝŶŐŝƚƐŽĸĐĞƌƐ͕ĂŐĞŶƚƐ͕ĂŶĚĞŵƉůŽLJĞĞƐ͕ĂƐĂŶĂĚĚŝƟŽŶĂůŝŶƐƵƌĞĚ ƵŶĚĞƌƚŚĞ^ƵƉƉůŝĞƌ͛ƐĐŽŵŵĞƌĐŝĂůŐĞŶĞƌĂůůŝĂďŝůŝƚLJŝŶƐƵƌĂŶĐĞƉŽůŝĐLJǁŝƚŚƌĞƐƉĞĐƚƚŽůŝĂďŝůŝƚLJĂƌŝƐŝŶŐ ŽƵƚŽĨĂĐƟǀŝƟĞƐ͕͞ŽƉĞƌĂƟŽŶƐ͕͟Žƌ͞ǁŽƌŬ͟ƉĞƌĨŽƌŵĞĚďLJŽƌŽŶďĞŚĂůĨŽĨ^ƵƉƉůŝĞƌ͕ĂŶĚƉƌŽĚƵĐƚƐ ĂŶĚĐŽŵƉůĞƚĞĚŽƉĞƌĂƟŽŶƐŽĨ^ƵƉƉůŝĞƌ͘dŚĞƉŽůŝĐLJƉƌŽǀŝƐŝŽŶ;ƐͿŽƌĞŶĚŽƌƐĞŵĞŶƚ;ƐͿŵƵƐƚĨƵƌƚŚĞƌ provide that coverage is primary and not excess over or contributory with any other valid, ĂƉƉůŝĐĂďůĞ͕ĂŶĚĐŽůůĞĐƟďůĞŝŶƐƵƌĂŶĐĞŽƌƐĞůĨ-ŝŶƐƵƌĂŶĐĞŝŶĨŽƌĐĞĨŽƌƚŚĞĂĚĚŝƟŽŶĂůŝŶƐƵƌĞĚƐ͘

d) tĂŝǀĞƌŽĨ^ƵďƌŽŐĂƟŽŶ͘ ^ƵƉƉůŝĞƌǁĂŝǀĞƐĂŶĚŵƵƐƚƌĞƋƵŝƌĞ;ďLJĞŶĚŽƌƐĞŵĞŶƚŽƌŽƚŚĞƌǁŝƐĞͿĂůůŝƚƐ ŝŶƐƵƌĞƌƐƚŽǁĂŝǀĞƐƵďƌŽŐĂƟŽŶƌŝŐŚƚƐĂŐĂŝŶƐƚ^ŽƵƌĐĞǁĞůůĂŶĚŽƚŚĞƌĂĚĚŝƟŽŶĂůŝŶƐƵƌĞĚƐĨŽƌůŽƐƐĞƐ ƉĂŝĚƵŶĚĞƌƚŚĞŝŶƐƵƌĂŶĐĞƉŽůŝĐŝĞƐƌĞƋƵŝƌĞĚďLJƚŚŝƐŐƌĞĞŵĞŶƚŽƌŽƚŚĞƌŝŶƐƵƌĂŶĐĞĂƉƉůŝĐĂble to ƚŚĞ^ƵƉƉůŝĞƌŽƌŝƚƐƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘dŚĞǁĂŝǀĞƌŵƵƐƚĂƉƉůLJƚŽĂůůĚĞĚƵĐƟďůĞƐĂŶĚͬŽƌƐĞůĨ-insured ƌĞƚĞŶƟŽŶƐĂƉƉůŝĐĂďůĞƚŽƚŚĞƌĞƋƵŝƌĞĚŽƌĂŶLJŽƚŚĞƌŝŶƐƵƌĂŶĐĞŵĂŝŶƚĂŝŶĞĚďLJƚŚĞ^ƵƉƉůŝĞƌŽƌŝƚƐ ƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘tŚĞƌĞƉĞƌŵŝƩĞĚďLJůĂǁ͕^ƵƉƉůŝĞƌŵƵƐƚƌĞƋƵŝƌĞƐŝŵŝůĂƌǁƌŝƩĞŶĞdžƉƌĞƐƐǁĂŝǀĞƌƐ ŽĨƐƵďƌŽŐĂƟŽŶĂŶĚŝŶƐƵƌĂŶĐĞĐůĂƵƐĞƐĨƌŽŵĞĂĐŚŽĨŝƚƐƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘

e) hŵďƌĞůůĂͬ
džĐĞƐƐ>ŝĂďŝůŝƚLJͬ^
>&-/E^hZ
Z
d
Ed/KE͘ dŚĞůŝŵŝƚƐƌĞƋƵŝƌĞĚďLJƚŚŝƐAgreement can
ďĞŵĞƚďLJĞŝƚŚĞƌƉƌŽǀŝĚŝŶŐĂƉƌŝŵĂƌLJƉŽůŝĐLJŽƌŝŶĐŽŵďŝŶĂƟŽŶǁŝƚŚƵŵďƌĞůůĂͬĞdžĐĞƐƐůŝĂďŝůŝƚLJ ƉŽůŝĐLJ;ŝĞƐͿ͕ŽƌƐĞůĨ-ŝŶƐƵƌĞĚƌĞƚĞŶƟŽŶ͘

ϮϯͿ dĞƌŵŝŶĂƟŽŶĨŽƌŽŶǀĞŶŝĞŶĐĞ͘ Sourcewell or Supplier may terminate this Agreement upon 60 ĐĂůĞŶĚĂƌĚĂLJƐΖǁƌŝƩĞŶŶŽƟĐĞƚŽƚŚĞŽƚŚĞƌWĂƌƚLJ͘dĞƌŵŝŶĂƟŽŶƉƵƌƐƵĂŶƚƚŽƚŚŝƐƐĞĐƟŽŶǁŝůůŶŽƚƌĞůŝĞǀĞ ƚŚĞ^ƵƉƉůŝĞƌ͛ƐŽďůŝŐĂƟŽŶƐƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚĨŽƌany ƚƌĂŶƐĂĐƟŽŶƐĞŶƚĞƌĞĚǁŝƚŚWĂƌƟĐŝƉĂƟŶŐ

ŶƟƟĞƐƚŚƌŽƵŐŚƚŚĞĚĂƚĞŽĨƚĞƌŵŝŶĂƟŽŶ͕ŝŶĐůƵĚŝŶŐƌĞƉŽƌƟŶŐĂŶĚƉĂLJŵĞŶƚŽĨĂƉƉůŝĐĂďůĞ ĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƐ͘

24) dĞƌŵŝŶĂƟŽŶĨŽƌĂƵƐĞ͘ ^ŽƵƌĐĞǁĞůůŵĂLJƚĞƌŵŝŶĂƚĞƚŚŝƐŐƌĞĞŵĞŶƚƵƉŽŶƉƌŽǀŝĚŝŶŐǁƌŝƩĞŶŶŽƟĐĞŽĨ ŵĂƚĞƌŝĂůďƌĞĂĐŚƚŽ^ƵƉƉůŝĞƌ ͘EŽƟĐĞŵƵƐƚĚĞƐĐƌŝďĞƚŚĞďƌĞĂĐŚŝŶƌĞĂƐŽŶĂďůĞĚĞƚĂŝůĂŶĚƐƚĂƚĞƚŚĞ ŝŶƚĞŶƚƚŽƚĞƌŵŝŶĂƚĞƚŚĞŐƌĞĞŵĞŶƚ͘hƉŽŶƌĞĐĞŝƉƚŽĨEŽƟĐĞ͕ƚŚĞ^ƵƉƉůŝĞƌǁŝůůŚĂǀĞϯϬĐalendar days ŝŶǁŚŝĐŚŝƚŵƵƐƚĐƵƌĞƚŚĞďƌĞĂĐŚ͘d ĞƌŵŝŶĂƟŽŶƉƵƌƐƵĂŶƚƚŽƚŚŝƐƐĞĐƟŽŶǁŝůůŶŽƚƌĞůŝĞǀĞƚŚĞ^ƵƉƉůŝĞƌ͛Ɛ ŽďůŝŐĂƟŽŶƐƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚĨŽƌany ƚƌĂŶƐĂĐƟŽŶƐĞŶƚĞƌĞĚǁŝƚŚWĂƌƟĐŝƉĂƟŶŐ ŶƟƟĞƐƚŚƌŽƵŐŚƚŚĞ
ĚĂƚĞŽĨƚĞƌŵŝŶĂƟŽŶ͕ŝŶĐůƵĚŝŶŐƌĞƉŽƌƟŶŐĂŶĚƉĂLJŵĞŶƚŽĨĂƉƉůŝĐĂďůĞĚŵŝŶŝƐƚƌĂƟǀĞ&ĞĞƐ͘

ƌƟĐůĞϯ͗
^ƵƉƉůŝĞƌKďůŝŐĂƟŽŶƐƚŽWĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐ

dŚĞd ĞƌŵƐŝŶƚŚŝƐƌƟĐůĞϯƌĞůĂƚĞƐƉĞĐŝĮĐĂůůLJƚŽ^ƵƉƉůŝĞƌĂŶĚĂWĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJǁŚĞŶĞŶƚĞƌŝŶŐ
ƚƌĂŶƐĂĐƟŽŶƐƵƟůŝnjŝŶŐƚŚĞ'ĞŶĞƌĂůd ĞƌŵƐĞƐƚĂďůŝƐŚĞĚŝŶƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚ͘ƌƟĐůĞϭ'ĞŶĞƌĂůdĞƌŵƐ ĐŽŶƚƌŽůŽǀĞƌĂŶLJĐŽŶŇŝĐƚǁŝƚŚƚŚŝƐƌƟĐůĞ ϯ͘tŚĞƌĞƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚŝƐƐŝůĞŶƚŽŶĂŶLJƐƵďũĞĐƚ͕ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJĂŶĚ^ƵƉƉůŝĞƌƌĞƚĂŝŶƚŚĞĂďŝůŝƚLJƚŽŶĞŐŽƟĂƚĞŵƵƚƵĂůůLJĂĐĐĞƉƚĂďůĞƚĞƌŵƐ.

1) YƵŽƚĞƐƚŽWĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐ͘ ^ƵƉƉůŝĞƌƐĂƌĞĞŶĐŽƵƌĂŐĞĚƚŽƉƌŽǀŝĚĞĂůůƉƌŝĐŝŶŐŝŶĨŽƌŵĂƟŽŶ ƌĞŐĂƌĚŝŶŐƚŚĞƚŽƚĂůĐŽƐƚŽĨĂĐƋƵŝƐŝƟŽŶǁŚĞŶƋƵŽƟŶŐƚŽĂWĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJ͘^ƵƉƉůŝĞƌƐĂŶĚ
WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐĂƌĞĞŶĐŽƵƌĂŐĞĚƚŽŝŶĐůƵĚĞĂůůĐŽƐƚƐƉĞĐŝĮĐĂůůLJĂƐƐŽĐŝĂƚĞĚǁŝƚŚŽƌŝŶĐůƵĚĞĚǁŝthin ƚŚĞ^ƵƉƉůŝĞƌƐƉƌŽƉŽƐĂůĂŶĚ/ŶĐůƵĚĞĚ^ŽůƵƟŽŶƐ ǁŝƚŚŝŶƚƌĂŶƐĂĐƟŽŶĚŽĐƵŵĞŶƚƐ. 
 

!





 




Page 105 of 1283 ends

041525-FNR

v052824 13

2) ^ŚŝƉƉŝŶŐ͕ĞůŝǀĞƌLJ͕ĐĐĞƉƚĂŶĐĞ͕ZĞũĞĐƟŽŶ͕ĂŶĚtĂƌƌĂŶƚLJ͘ ^ƵƉƉůŝĞƌ͛ƐƉƌŽƉŽƐĂůŵĂLJŝŶĐůƵĚĞƉƌŽƉŽƐĞĚ ƚĞƌŵƐƌĞůĂƟŶŐƚŽƐŚŝƉƉŝŶŐ͕ĚĞůŝǀĞƌLJ͕ŝŶƐƉĞĐƟŽŶ͕ĂŶĚĂĐĐĞƉƚĂŶĐĞͬƌĞũĞĐƟŽŶ and other relevant terms ŽĨƚĞŶĚĞƌĞĚ^ŽůƵƟŽŶƐ͘^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŵĂLJŶĞŐŽƟĂƚĞĮŶĂůƚĞƌŵƐĂƉƉƌŽƉƌŝĂƚĞĨŽƌƚŚĞ
ƐƉĞĐŝĮĐƚƌĂŶƐĂĐƟŽŶƌĞůĂƟŶŐƚŽnon-ĂƉƉƌŽƉƌŝĂƟŽŶ͕ƐŚŝƉƉŝŶŐ͕ĚĞůŝǀĞƌLJ͕ŝŶƐƉĞĐƟŽŶ͕ ĂĐĐĞƉƚĂŶĐĞͬƌĞũĞĐƟŽŶŽĨƚĞŶĚĞƌĞĚ ^ŽůƵƟŽŶƐ͕ĂŶĚǁĂƌƌĂŶƚLJĐŽǀĞƌĂŐĞĨŽƌ/ŶĐůƵĚĞĚ^ŽůƵƟŽŶƐ͘^ƵĐŚ ƚĞƌŵƐŵĂLJŝŶĐůƵĚĞ͕ďƵƚĂƌĞŶŽƚůŝŵŝƚĞĚƚŽ͕ĐŽƐƚƐ͕ƌŝƐŬŽĨůŽƐƐ͕ƉƌŽƉĞƌƉĂĐŬĂŐŝŶŐ͕ŝŶƐƉĞĐƟŽŶƌŝŐŚƚƐĂŶĚ ƟŵĞůŝŶĞƐ͕ĂĐĐĞƉƚĂŶĐĞŽƌƌĞũĞĐƟŽŶƉƌŽĐĞĚƵƌĞƐ͕ĂŶĚƌĞŵĞĚŝĞƐĂƐŵƵƚƵĂůůLJĂŐƌĞĞĚŝŶĐůƵĚĞŶŽƟĐĞ ƌĞƋƵŝrements, replacement, return or exchange procedures, and associated costs.

ϯͿ ƉƉůŝĐĂďůĞdĂdžĞƐ͘ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŝƐƌĞƐƉŽŶƐŝďůĞĨŽƌŶŽƟĨLJŝŶŐƐƵƉƉůŝĞƌŽĨŝƚƐƚĂdž-exempt status and ĨŽƌƉƌŽǀŝĚŝŶŐ^ƵƉƉůŝĞƌǁŝƚŚĂŶLJǀĂůŝĚƚĂdž-ĞdžĞŵƉƟŽŶĐĞƌƟĮĐĂƟŽŶ;ƐͿŽƌƌĞůĂƚĞĚĚŽĐƵŵĞŶƚĂƟŽŶ͘

4) KƌĚĞƌŝŶŐWƌŽĐĞƐƐĂŶĚWĂLJŵĞŶƚ͘ ^ƵƉƉůŝĞƌ͛ƐŽƌĚĞƌŝŶŐƉƌŽĐĞƐƐĂŶĚĂĐĐĞƉƚĂďůĞĨŽƌŵƐŽĨƉĂLJŵĞŶƚĂƌĞ ŝŶĐůƵĚĞĚǁŝƚŚŝŶŝƚƐWƌŽƉŽƐĂů͘WĂƌƟĐŝƉĂƟŶŐ
ŶƟƟĞƐǁŝůůďĞƐŽůĞůLJƌĞƐƉŽŶƐŝďůĞĨŽƌƉĂLJŵĞŶƚƚŽ^ƵƉƉůŝĞƌ ĂŶĚ^ŽƵƌĐĞǁĞůůǁŝůůŚĂǀĞŶŽůŝĂďŝůŝƚLJĨŽƌĂŶLJƵŶƉĂŝĚŝŶǀŽŝĐĞŽĨĂŶLJWĂƌƟĐŝƉĂƟŶŐ ŶƟƚy.

5) dƌĂŶƐĂĐƟŽŶŽĐƵŵĞŶƚƐ͘ WĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŵĂLJƌĞƋƵŝƌĞƚŚĞƵƐĞŽĨŝƚƐŽǁŶĨŽƌŵƐƚŽĐŽŵƉůĞƚĞ
ƚƌĂŶƐĂĐƟŽŶƐĚŝƌĞĐƚůLJǁŝƚŚ^ƵƉƉůŝĞƌƵƟůŝnjŝŶŐƚŚĞƚĞƌŵƐĞƐƚĂďůŝƐŚĞĚŝŶƚŚŝƐŐƌĞĞŵĞŶƚ͘^ƵƉƉůŝĞƌ͛Ɛ ƐƚĂŶĚĂƌĚĨŽƌŵĂŐƌĞĞŵĞŶƚƐŵĂLJďĞŽīĞƌĞĚĂƐƉĂƌƚŽĨŝƚƐWƌŽƉŽƐĂů͘^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJ
ŵĂLJĐŽŵƉůĞƚĞĂŶĚĚŽĐƵŵĞŶƚƚƌĂŶƐĂĐƟŽŶƐƵƟůŝnjŝŶŐĂŶLJƚLJƉĞŽĨƚƌĂŶƐĂĐƟŽŶĚŽĐƵŵĞŶƚƐĂƐŵƵƚƵĂůůLJ ĂŐƌĞĞĚ͘/ŶĂŶLJƚƌĂŶƐĂĐƟŽŶĚŽĐƵŵĞŶƚĞŶƚĞƌĞĚƵƟůŝnjŝŶŐƚŚŝƐŐƌĞĞŵĞŶƚ͕^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ

ŶƟƚLJŵƵƐƚŝŶĐůƵĚĞƐƉĞĐŝĮĐƌĞĨĞƌĞŶĐĞƚŽƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚďLJŶƵŵďĞƌĂŶĚƚŽWĂƌƟĐŝƉĂƟŶŐ

ŶƟƚLJ͛ƐƵŶŝƋƵĞ^ŽƵƌĐĞǁĞůůaccount number.

6) ĚĚŝƟŽŶĂůdĞƌŵƐĂŶĚŽŶĚŝƟŽŶƐ WĞƌŵŝƩĞĚ͘ WĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJĂŶĚ^ƵƉƉůŝĞƌŵĂLJŶĞŐŽƟĂƚĞĂŶĚ
ŝŶĐůƵĚĞĂĚĚŝƟŽŶĂůƚĞƌŵƐĂŶĚĐŽŶĚŝƟŽŶƐǁŝƚŚŝŶƚƌĂŶƐĂĐƟŽŶĚŽĐƵŵĞŶƚĂƟŽŶĂƐŵƵƚƵĂůůLJĂŐƌĞĞĚ͘^ƵĐŚ terms may supplant or supersede this Master Agreement when necessary and as solely determined ďLJWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ͘^ŽƵƌĐĞǁĞůůŚĂƐĞdžƉƌĞƐƐůLJƌĞƐĞƌǀĞĚƚŚĞƌŝŐŚƚĨŽƌ^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ

ŶƟƚLJƚŽĂĚĚƌĞƐƐĂŶLJŶĞĐĞƐƐĂƌLJƉƌŽǀŝƐŝŽŶƐǁŝƚŚŝŶƚƌĂŶƐĂĐƟŽŶĚŽĐƵŵĞŶƚƐŶŽƚĞdžƉƌĞƐƐůLJŝŶĐůƵĚĞĚ within this Master Agreement, ŝŶĐůƵĚŝŶŐďƵƚŶŽƚůŝŵŝƚĞĚƚŽƚƌĂŶƐĂĐƟŽŶĐĂŶĐĞůůĂƟŽŶ͕ĚŝƐƉƵƚĞ ƌĞƐŽůƵƟŽŶ͕ŐŽǀĞƌŶŝŶŐůĂǁĂŶĚǀĞŶƵĞ͕ŶŽŶ-ĂƉƉƌŽƉƌŝĂƟŽŶ͕ŝŶƐƵƌĂŶĐĞ͕ĚĞĨĞŶƐĞĂŶĚŝŶĚĞŵŶŝƚLJ͕ĨŽƌĐĞ ŵĂũĞƵƌĞ͕and other material terms as mutually agreed.

7) ^ƵďƐĞƋƵĞŶƚŐƌĞĞŵĞŶƚƐĂŶĚ^ƵƌǀŝǀĂů͘ ^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ ŶƟƚLJŵĂLJĞŶƚĞƌŝŶƚŽĂƐĞƉĂƌĂƚĞ
ĂŐƌĞĞŵĞŶƚƚŽĨĂĐŝůŝƚĂƚĞůŽŶŐ-ƚĞƌŵƉĞƌĨŽƌŵĂŶĐĞŽďůŝŐĂƟŽŶƐƵƟůŝnjŝŶŐƚŚĞƚĞƌŵƐŽĨƚŚŝƐDĂƐƚĞƌ ŐƌĞĞŵĞŶƚĂƐŵƵƚƵĂůůLJĂŐƌĞĞĚ͘^ƵĐŚĂŐƌĞĞŵĞŶƚƐŵĂLJƉƌŽǀŝĚĞĨŽƌĂƉĞƌĨŽƌŵĂŶĐĞƉĞƌŝŽĚĞdžƚĞŶĚŝŶŐ beyond thĞĨƵůůƚĞƌŵŽĨƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚ ĂƐĚĞƚĞƌŵŝŶĞĚŝŶƚŚĞĚŝƐĐƌĞƟŽŶŽĨWĂƌƟĐŝƉĂƟŶŐ

ŶƟƚLJ.

8) WĂƌƟĐŝƉĂƟŶŐĚĚĞŶĚƵŵƐ͘ ^ƵƉƉůŝĞƌĂŶĚWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJŵĂLJĞŶƚĞƌĂWĂƌƟĐŝƉĂƟŶŐĚĚĞŶĚƵŵŽƌ
ƐŝŵŝůĂƌĚŽĐƵŵĞŶƚĞdžƚĞŶĚŝŶŐĂŶĚƐƵƉƉůĞŵĞŶƟŶŐƚŚĞƚĞƌŵƐŽĨƚŚŝƐDĂƐƚĞƌŐƌĞĞŵĞŶƚƚŽĨĂĐŝůŝƚĂƚĞ ĂĚŽƉƟŽŶĂƐŵĂLJďĞƌĞƋƵŝƌĞĚďLJĂWĂƌƟĐŝƉĂƟŶŐ
ŶƟƚLJ͘


 

!





 




Page 106 of 1283 ends

041525-FNR

v052824 14

Sourcewell Fonroche Lighting America

LJ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ LJ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ :ĞƌĞŵLJ^ĐŚǁĂƌƚnj ,ŽĐŝŶĞĞŶĂŽƵŵ
dŝƚůĞ͗ŚŝĞĨWƌŽĐƵƌĞŵĞŶƚKĨĨŝĐĞƌ dŝƚůĞ͗CEO

ĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ

ĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ


 

!





 




 "



 "


Page 107 of 1283 ends

5)36PDUW,QIUDVWUXFWXUH6ROXWLRQV2XWGRRU6HQVRUV DQG5HODWHG3URGXFWVDQG6HUYLFHV

9HQGRU'HWDLOV
&RPSDQ\1DPH
)RQURFKH/LJKWLQJ$PHULFD
$GGUHVV


'DYLG6WULFNODQG5G
)RUW:RUWK7H[DV

&RQWDFW
DQLFHWPDERQ]R
(PDLO
DPDERQ]R#IRQURFKHXV
3KRQH


)D[


+67


6XEPLVVLRQ'HWDLOV
&UHDWHG2Q
)ULGD\)HEUXDU\


6XEPLWWHG2Q
7XHVGD\$SULO


6XEPLWWHG%\
DQLFHWPDERQ]R
(PDLO
DPDERQ]R#IRQURFKHXV
7UDQVDFWLRQ
EHHDDEGHHGEDF

HD

I
6XEPLWWHU
V,3$GGUHVV

Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 108 of 1283 ends

6SHFLILFDWLRQV
7DEOH
3URSRVHU,GHQWLW\ $XWKRUL]HG5HSUHVHQWDWLYHV
1RW6FRUHG

*HQHUDO,QVWUXFWLRQV 
DSSOLHVWRDOO7DEOHV
6RXUFHZHOOSUHIHUVDEULHIEXWWKRURXJKUHVSRQVHWRHDFKTXHVWLRQ'RQRWPHUHO\DWWDFK DGGLWLRQDOGRFXPHQWVWR\RXUUHVSRQVHZLWKRXWDOVRSURYLGLQJDVXEVWDQWLYHUHVSRQVH'RQRWOHDYHDQVZHUVEODQN UHVSRQG³1$´LIWKH
TXHVWLRQGRHVQRWDSSO\WR\RX
SUHIHUDEO\ZLWKDQH[SODQDWLRQ

7DEOH6SHFLILF,QVWUXFWLRQV6RXUFHZHOOUHTXLUHVLGHQWLILFDWLRQRIDOOSDUWLHVUHVSRQVLEOHIRUSURYLGLQJ6ROXWLRQVXQGHUDUHVXOWLQJPDVWHU

DJUHHPHQW
V

5HVSRQVLEOH6XSSOLHU
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¶VFRUSRUDWHRUJDQL]DWLRQDIILOLDWLRQ /LQH
,WHP 4XHVWLRQ 5HVSRQVH 
 3URYLGHௐWKHௐOHJDOௐQDPHௐRIௐWKHௐ3URSRVHUௐ
DXWKRUL]HGௐWRௐVXEPLWௐWKLVௐ3URSRVDO
)RQURFKHௐ/LJKWLQJௐ$PHULFD 
 ,QௐWKHௐHYHQWௐRIௐDZDUGௐLVௐWKLVௐHQWLW\ௐWKHௐ
5HVSRQVLEOHௐ6XSSOLHUௐWKDWௐZLOOௐH[HFXWHௐWKHௐ
PDVWHUௐDJUHHPHQWௐZLWKௐ6RXUFHZHOO"ௐ<ௐRUௐ1
<HV

 ,GHQWLI\ௐDOOௐVXEVLGLDULHVௐ'%$ௐDXWKRUL]HGௐ
DIILOLDWHVௐDQGௐDQ\ௐRWKHUௐHQWLW\ௐWKDWௐZLOOௐEHௐ
UHVSRQVLEOHௐIRUௐRIIHULQJௐDQGௐSHUIRUPLQJௐGHOLYHU\ௐ
RIௐ6ROXWLRQVௐZLWKLQௐWKLVௐ3URSRVDOௐ
LHௐ
5HVSRQVLEOHௐ6XSSOLHU
V
ௐWKDWௐZLOOௐH[HFXWHௐDௐ
PDVWHUௐDJUHHPHQWௐZLWKௐ6RXUFHZHOO

1$ௐௐ)RQURFKHௐ/LJKWLQJௐ$PHULFDௐLVௐWKHௐPDQXIDFWXUHUௐDQGௐJHQHUDOௐFRQWUDFWRUௐIRUௐ LQVWDOODWLRQV

 3URYLGHௐ\RXUௐ&$*(ௐFRGHௐRUௐ8QLTXHௐ(QWLW\ௐ
,GHQWLILHUௐ
6$0

7= 
 3URYLGHௐ\RXUௐ1$,&6ௐFRGHௐDSSOLFDEOHௐWRௐ
6ROXWLRQVௐSURSRVHG
ௐௐௐௐ
ௐ

 3URSRVHUௐ3K\VLFDOௐ$GGUHVV
ௐ6(ௐ/RRSௐௐ%XLOGLQJௐ&ௐ)RUWௐ:R UWKௐ7;ௐ 
 3URSRVHUௐZHEVLWHௐDGGUHVVௐ
RUௐDGGUHVVHV

KWWSV
ZZZIRQURFKHVRODUOLJKWLQJFRP 
 3URSRVHU
Vௐ$XWKRUL]HGௐ5HSUHVHQWDWLYHௐ
QDPHௐ
WLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH
ௐ
7KHௐ
UHSUHVHQWDWLYHௐPXVWௐKDYHௐDXWKRULW\ௐWRௐVLJQௐ
WKHௐ³3URSRVHU¶Vௐ$VVXUDQFHௐRIௐ&RPSOLDQFH´ௐRQௐ
EHKDOIௐRIௐWKHௐ3URSRVHU

+RFLQHௐ%HQDRXP
&(2
ௐ6(ௐ/RRSௐௐ%XLOGLQJௐ&ௐ)RUWௐ:RUWKௐ7;ௐ
KRFLQHEHQDRXP#IRQURFKHXV



3URSRVHU
VௐSULPDU\ௐFRQWDFWௐIRUௐWKLVௐSURSRVDOௐ

QDPHௐWLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH

'DOHௐ&XUWLV
93ௐ6DOHV

ௐ0DLQௐ6Wௐ6WHௐௐ%RLVHௐ,'ௐ
GDOHFXUWLV#IRQURFKHXV




 3URSRVHU
VௐRWKHUௐFRQWDFWVௐIRUௐWKLVௐSURSRVDOௐLIௐ
DQ\ௐ
QDPHௐWLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐ
SKRQH

$QLFHWௐ0DERQ]R
5HJLRQDOௐ6DOHVௐ0DQDJHU
ௐ&\SUHVVௐ:DWHUVௐ%OYGௐ6WHௐௐ&RSSHOOௐ7;ௐ

DPDERQ]R#IRQURFKHXV


*UHJௐ3HWLSDV
2SHUDWLRQVௐ'LUHFWRU
ௐ6(ௐ/RRSௐௐ%XLOGLQJௐ&ௐ)RUWௐ:RUWKௐ7;ௐ
JUHJSHWLSDV#IRQURFKHXV


7DEOH$
)LQDQFLDO9LDELOLW\DQG0DUNHWSODFH6XFFHVV
3RLQWVDSSOLHVWR7DEOH$DQG%

/LQH
,WHP 4XHVWLRQ 5HVSRQVH 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 109 of 1283 ends

 3URYLGHௐDௐEULHIௐKLVWRU\ௐRIௐ\RXUௐFRPSDQ\ௐ
LQFOXGLQJௐ\RXUௐFRPSDQ\¶VௐFRUHௐYDOXHVௐ
EXVLQHVVௐSKLORVRSK\ௐDQGௐLQGXVWU\ௐORQJHYLW\ௐ
UHODWHGௐWRௐWKHௐUHTXHVWHGௐ6ROXWLRQV
)RQURFKHௐZDVௐIRXQGHGௐLQௐௐLQௐ$JHQௐ)UDQFHௐE\ௐ<DQௐ0DXVௐௐ,Qௐௐ)RQURFKHௐSXWௐ WRௐPDUNHWௐWKHௐ3RZHUௐௐ6PDUWOLJKWௐJXDUDQWHHLQJௐௐGD\VௐRIௐDXWRQRP\ௐ,Qௐௐ )RQURFKHௐFRPSOHWHGௐILUVWௐ6XSHUVWRUHௐSURMHFWௐ,Qௐௐ)RQURFKHௐZDVௐDZDUGHGௐWKHௐ :RUOG
VௐODUJHVWௐVRODUௐOLJKWLQJௐSURMHFWௐGHSOR\LQJௐௐ6PDUWOLJKWVௐWRௐ6HQHJDOௐ,Qௐ 
ௐ)RQURFKHௐ/LJKWLQJௐ$PHULFDௐHVWDEOLVKHGௐZLWKௐWKHௐDFTXLVLWLRQௐRIௐ6RODU2QHௐ 6ROXWLRQVௐ,Qௐௐ)RQURFKHௐ/LJKWLQJௐ$PHULFDௐFRPSOHWHVௐPDMRUௐSURMHFWVௐZLWKௐ GHYHORSHUVௐ7D\ORUௐ0RUULVRQௐ9DQௐ'DHOHௐ+RPHVௐ0HWURௐ'HYHORSPHQWௐ'DONLDௐ&LW\ௐRIௐ $OEXTXHUTXHௐLQVWDOOLQJௐRYHUௐௐ6PDUW/LJKWVௐLQௐWKHௐ86ௐ,Qௐௐ)RQURFKHௐUHDFKHGௐ WKௐPXQLFLSDOLW\ௐFXVWRPHUௐEHFDPHௐHQGRUVHGௐE\ௐ&LW\ௐRIௐ/RVௐ$QJHOHVௐ,Qௐௐ )RQURFKHௐVROGௐௐ6PDUWOLJKWVௐWRௐ
ௐFXVWRPHUVௐFRPSULVHGௐPRVWO\ௐRIௐFLW\ௐDQGௐ
FRXQW\ௐJRYHUQPHQWௐVDOHV
)RQURFKHௐFRUHௐYDOXHVௐDQGௐEXVLQHVVௐSKLORVRSK\ௐDUHௐEDVHGௐDURXQGௐWHDPZRUNௐDQGௐ UHOLDELOLW\ௐௐ)RQURFKHௐ&(2ௐLVௐDௐIRUPHUௐSURIHVVLRQDOௐUXJE\ௐSOD\HUௐDQGௐWHDPௐJHQHUDOௐ PDQDJHUௐௐ$VௐVXFKௐWHDPௐLVௐFRUHௐWRௐ)RQURFKHௐ'1$ௐௐ)RQURFKHௐLVௐPDNLQJௐVRODUௐWKHௐ QHZௐVWDQGDUGௐIRUௐVWUHHWௐOLJKWLQJௐ2QHௐRIௐWKHௐFRUHௐFKDUDFWHULVWLFVௐIRUௐWKLVௐLVௐUHOLDELOLW\ௐௐ )RQURFKHௐKDVௐWKHௐ:RUOG
VௐODUJHVWௐVRODUௐOLJKWLQJௐWHVWௐIDFLOLW\ௐDQGௐௐHQJLQHHUVௐIRFXVHGௐ RQௐFRQWLQXRXVௐLPSURYHPHQW

 :KDWௐDUHௐ\RXUௐFRPSDQ\¶VௐH[SHFWDWLRQVௐLQௐWKHௐ
HYHQWௐRIௐDQௐDZDUG"
2XUௐH[SHFWDWLRQௐLVௐWRௐSURPRWHௐDVௐPXFKௐSURFXUHPHQWௐRIௐ)RQURFKHௐWKURXJKௐ6RXUFHZHOOௐ DVௐSRVVLEOHௐௐ7KLVௐSURPRWLRQௐZLOOௐEHௐFRPSOHWHGௐWKURXJKௐ)RQURFKHௐ'LUHFWௐ6DOHVௐ7HDPௐ RIௐௐ
ZLOOௐGRXEOHௐLQௐ
ௐZKRௐZRUNௐZLWKௐJRYHUQPHQWௐHQGௐXVHUVௐHYHU\ௐGD\ௐDQGௐ
WKURXJKௐ)RQURFKHௐ0DUNHWLQJௐWHDPௐRIௐௐSHRSOHௐFUHDWLQJௐPDWHULDOௐDQGௐ6(2ௐ RSWLPL]DWLRQௐGDLO\ௐௐ'LUHFWௐSURFXUHPHQWௐE\ௐFXVWRPHUVௐPDNHVௐWKHLUௐSXUFKDVLQJௐSURFHVVௐ PXFKௐHDVLHUௐௐ6RXUFHZHOOௐLVௐWKHௐSURFXUHPHQWௐFRRSHUDWLYHௐPRVWௐZLGHO\ௐXVHGௐE\ௐ )RQURFKHௐJRYHUQPHQWௐFXVWRPHUVௐௐ)RQURFKHௐZLOOௐSURPRWHௐ6RXUFHZHOOௐWRௐERWKௐH[LVWLQJௐ FXVWRPHUVௐDQGௐQHZௐFXVWRPHUV

 'HPRQVWUDWHௐ\RXUௐILQDQFLDOௐVWUHQJWKௐDQGௐ
VWDELOLW\ௐZLWKௐPHDQLQJIXOௐGDWDௐ7KLVௐFRXOGௐ
LQFOXGHௐVXFKௐLWHPVௐDVௐILQDQFLDOௐVWDWHPHQWVௐ
6(&ௐILOLQJVௐFUHGLWௐDQGௐERQGௐUDWLQJVௐOHWWHUVௐ
RIௐFUHGLWௐDQGௐGHWDLOHGௐUHIHUHQFHௐOHWWHUVௐ
8SORDGௐVXSSRUWLQJௐGRFXPHQWVௐ
DVௐDSSOLFDEOH
ௐ
LQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVHௐ'2ௐ127ௐ3529,'(ௐ$1<ௐ7$;ௐ
,1)250$7,21ௐ25ௐ3(5621$//<ௐ
,'(17,),$%/(ௐ,1)250$7,21
)LQDQFLDOௐVWDWHPHQW

 :KDWௐLVௐ\RXUௐ86ௐPDUNHWௐVKDUHௐIRUௐWKHௐ
6ROXWLRQVௐWKDWௐ\RXௐDUHௐSURSRVLQJ"
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐ86ௐPDUNHWௐVKDUHௐLVௐEHWZHHQௐௐௐ7KHUHௐLVௐQRௐRWKHUௐ VRODUௐOLJKWLQJௐPDQXIDFWXUHUௐLQௐWKHௐ:RUOGௐOHWௐDORQHௐ86ௐZLWKௐ)RQURFKHௐVL]HௐHQJLQHHULQJௐ DQGௐFDSDELOLWLHVௐௐ0RVWௐDOOௐRWKHUௐVXSSOLHUVௐRIௐVRODUௐOLJKWLQJௐLQௐWKHௐ86ௐDUHௐHLWKHU ௐ
ௐDௐ
VPDOOௐFRPSDQ\ௐRIௐௐௐSHRSOHERRWVWUDSSLQJௐDௐFRQILJXUDWLRQௐRIௐRIIௐWKHௐVKHOIௐ

FRPSRQHQWV
ௐ
ௐDௐGLVWULEXWRUௐUHSDFNDJLQJௐIRUHLJQௐSURGXFWVௐWRௐGLVWULEXWHௐLQWRௐWKHௐ86 ௐ

ௐPRVWௐRIWHQௐDௐFRPELQDWLRQௐRIௐௐ ௐ

 :KDWௐLVௐ\RXUௐ&DQDGLDQௐPDUNHWௐVKDUHௐIRUௐWKHௐ
6ROXWLRQVௐWKDWௐ\RXௐDUHௐSURSRVLQJ"
2XUௐ&DQDGLDQௐPDUNHWௐVKDUHௐLVௐௐௐ'XHௐWRௐSRSXODWLRQௐTXDQWLWLHVௐDQGௐVRODUௐ LUUDGLDWLRQௐFDSDELOLWLHVௐE\ௐIDUௐWKHௐPDMRULW\ௐRIௐDXWRQRPRXVௐVRODUௐVWUHHWௐOLJKWLQJௐVDOHVௐ RFFXUVௐLQௐWKHௐ86ௐௐ$VௐDௐUHVXOWௐRIௐWKLVௐRXUௐFRUHௐIRFXVௐRYHUௐWKHௐSDVWௐIHZௐ\HDUVௐKDVௐ EHHQௐGHYHORSLQJௐRXWௐWKHௐ86ௐPDUNHWௐௐ:HௐZLOOௐEHௐH[SDQGLQJௐRXUௐEXVLQHVVௐ GHYHORSPHQWௐIRFXVௐLQWRௐ&DQDGDௐRYHUௐWKHௐQH[WௐIHZௐ\HDUVௐDVௐZHௐFRQWLQXHௐHYDOXDWLQJௐ 1RUWKௐ$PHULFDQௐEXLOGௐRXWௐSULRULWLHV

 'LVFORVHௐDOOௐFXUUHQWௐDQGௐFRPSOHWHGௐEDQNUXSWF\ௐ
SURFHHGLQJVௐIRUௐ3URSRVHUௐDQGௐDQ\ௐLQFOXGHGௐ
SRVVLEOHௐ5HVSRQVLEOHௐ3DUW\ௐZLWKLQௐWKHௐSDVWௐ
VHYHQௐ\HDUVௐ3URSRVHUௐPXVWௐSURYLGHௐQRWLFHௐLQௐ
ZULWLQJௐWRௐ6RXUFHZHOOௐLIௐLWௐHQWHUVௐDௐEDQNUXSWF\ௐ
SURFHHGLQJௐDWௐDQ\ௐWLPHௐGXULQJௐWKHௐSHQGHQF\ௐ
RIௐWKLVௐ5)3ௐHYDOXDWLRQ
)RQURFKHௐ/LJKWLQJௐ$PHULFDQௐKDVௐQRWௐKDGௐDQ\ௐEDQNUXSWF\ௐSURFHHGLQJV 
 +RZௐLVௐ\RXUௐRUJDQL]DWLRQௐEHVWௐGHVFULEHG
ௐLVௐLWௐ
DௐPDQXIDFWXUHUௐDௐGLVWULEXWRUGHDOHUUHVHOOHUௐRUௐ
DௐVHUYLFHௐSURYLGHU"ௐௐ$QVZHUௐWKHௐTXHVWLRQௐWKDWௐ
EHVWௐDSSOLHVௐWRௐ\RXUௐRUJDQL]DWLRQௐHLWKHUௐD
ௐRUௐ
E

D
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐ
RUௐVLPLODUௐHQWLW\
ௐ
SURYLGHௐ\RXUௐZULWWHQௐDXWKRUL]DWLRQௐWRௐDFWௐDVௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐIRUௐWKHௐPDQXIDFWXUHUௐ
RIௐWKHௐSURGXFWVௐSURSRVHGௐLQௐWKLVௐ5)3ௐ,Iௐ
DSSOLFDEOHௐLVௐ\RXUௐGHDOHUௐQHWZRUNௐ
LQGHSHQGHQWௐRUௐFRPSDQ\ௐRZQHG"
E
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐDௐ
PDQXIDFWXUHUௐRUௐVHUYLFHௐSURYLGHUௐGHVFULEHௐ
\RXUௐUHODWLRQVKLSௐZLWKௐ\RXUௐVDOHVௐDQGௐVHUYLFHௐ
IRUFHௐDQGௐZLWKௐ\RXUௐGHDOHUௐQHWZRUNௐLQௐ
GHOLYHULQJௐWKHௐSURGXFWVௐDQGௐVHUYLFHVௐSURSRVHGௐ
LQௐWKLVௐ5)3ௐ$UHௐWKHVHௐLQGLYLGXDOVௐ\RXUௐ
HPSOR\HHVௐRUௐWKHௐHPSOR\HHVௐRIௐDௐWKLUGௐSDUW\"
%
ௐ)RQURFKHௐ/LJKWLQJௐ$PHULFDௐ
)/$
ௐLVௐWKHௐ:RUOG
VௐODUJHVWௐVRODUௐVWUHHWௐOLJKWLQJௐ
PDQXIDFWXUHUௐௐ)/$ௐIRFXVHVௐRQௐGLUHFWௐVDOHVௐZLWKௐDௐGLUHFWௐVDOHVௐWHDPௐZKRௐDUHௐ)/$ௐ HPSOR\HHVௐௐ:HௐGRXEOHGௐWKHௐVL]HௐRIௐWKHௐVDOHVௐWHDPௐODVWௐ\HDUௐDQGௐDUHௐGRXEOLQJௐLWௐ DJDLQௐWKLVௐ\HDUௐௐ:HௐKDYHௐIRXQGௐDௐGLUHFWௐVDOHVௐWHDPௐZKRௐIRFXVHVௐRQௐVHOOLQJௐ )RQURFKHௐHYHU\ௐGD\ௐIURPௐPRUQLQJௐWRௐQLJKWௐWRௐEHௐWKHௐPRVWௐHIIHFWLYHௐZD\ௐWRௐWUDQVIRUPௐ WKHௐPDUNHWSODFHௐWRௐPDNHௐVRODUௐOLJKWLQJௐWKHௐVWDQGDUGௐௐ)RQURFKHௐDOVRௐKDVௐDௐIHZௐ LQGHSHQGHQWௐUHSUHVHQWDWLYHVௐZKRௐVHOOௐ)RQURFKHௐEXWௐ
ௐRIௐ)RQURFKHௐVDOHVௐDUHௐ
WKURXJKௐGLUHFWௐ)RQURFKHௐHPSOR\HHௐVDOHVௐHIIRUWV
)RQURFKHௐDOVRௐKDVௐDௐGLUHFWௐVHUYLFHௐWHDPௐௐ)RQURFKHௐKDVௐௐUHJLRQDOௐVHUYLFHௐFHQWHUV ௐ
/RVௐ$QJHOHVௐ3KRHQL[ௐ%RLVHௐ)RUWௐ:RUWKௐ6DQௐ$QWRQLRௐ2UODQGRௐ$WODQWDௐ%RVWRQௐௐ )RQURFKHௐ6PDUWOLJKWVௐDUHௐHQJLQHHUHGௐIRUௐPDLQWHQDQFHௐIUHHௐIRUௐௐ\HDUVௐVRௐWKHௐ VHUYLFHௐFHQWHUVௐSULPDULO\ௐIDFLOLWDWHௐVPRRWKௐLQVWDOODWLRQVௐRIௐ)RQURFKHௐ6PDUWOLJKWV 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 110 of 1283 ends

 ,IௐDSSOLFDEOHௐSURYLGHௐDௐGHWDLOHGௐH[SODQDWLRQௐ
RXWOLQLQJௐWKHௐOLFHQVHVௐDQGௐFHUWLILFDWLRQVௐWKDWௐ
DUHௐERWKௐUHTXLUHGௐWRௐEHௐKHOGௐDQGௐDFWXDOO\ௐ
KHOGௐE\ௐ\RXUௐRUJDQL]DWLRQௐ
LQFOXGLQJௐWKLUGௐ
SDUWLHVௐDQGௐVXEFRQWUDFWRUVௐWKDWௐ\RXௐXVH
ௐLQௐ
SXUVXLWௐRIௐWKHௐEXVLQHVVௐFRQWHPSODWHGௐE\ௐWKLVௐ
5)3
,62
ௐ9HULWDVௐ,62


'LVFORVHௐDOOௐFXUUHQWௐDQGௐSDVWௐGHEDUPHQWVௐRUௐ
VXVSHQVLRQVௐIRUௐ3URSRVHUௐDQGௐDQ\ௐLQFOXGHGௐ
SRVVLEOHௐ5HVSRQVLEOHௐ3DUW\ௐZLWKLQௐWKHௐSDVWௐ
VHYHQௐ\HDUVௐ3URSRVHUௐPXVWௐSURYLGHௐQRWLFHௐLQௐ
ZULWLQJௐWRௐ6RXUFHZHOOௐLIௐLWௐHQWHUVௐDௐGHEDUPHQWௐ
RUௐVXVSHQVLRQௐVWDWXVௐDQ\ௐWLPHௐGXULQJௐWKHௐ
SHQGHQF\ௐRIௐWKLVௐ5)3ௐHYDOXDWLRQ
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐKDVௐ127ௐKDGௐDQ\ௐGHEDUPHQWVௐRUௐVXVSHQVLRQVௐIRUௐ 3URSRVHUௐQRUௐDQ\ௐLQFOXGHGௐSRVVLEOHௐ5HVSRQVLEOHௐ3DUW\

 'HVFULEHௐDQ\ௐUHOHYDQWௐLQGXVWU\ௐDZDUGVௐRUௐ
UHFRJQLWLRQௐWKDWௐ\RXUௐFRPSDQ\ௐKDVௐUHFHLYHGௐLQௐ
WKHௐSDVWௐILYHௐ\HDUV
)UHQFKௐ$PHULFDQௐ,QQRYDWLYHௐ&RPSDQ\ௐRIௐWKHௐ<HDUௐௐ&LW\ௐRIௐ7XFVRQௐ&RPPXQLW\ௐ 0HGDOOLRQௐ$ZDUGௐ1DWLYHௐ$PHULFDQௐ&RQVWUXFWLRQௐ&RPSDQ\   :KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐ
JRYHUQPHQWDOௐVHFWRUௐLQௐWKHௐSDVWௐWKUHHௐ\HDUV"
!ௐRIௐ)/$ௐVDOHVௐDUHௐWRௐWKHௐJRYHUQPHQWDOௐVHFWRUௐௐ0RUHௐVSHFLILFDOO\ௐ)/$ௐIRFXVHVௐ VDOHVௐHIIRUWVௐWRௐ0XQLFLSDOLWLHVௐDQGௐ&RXQWLHVௐௐ7KHVHௐORFDOௐDQGௐFRXQW\ௐJRYHUQPHQWVௐDUHௐ E\ௐIDUௐWKHௐODUJHVWௐXVHUVௐRIௐRXWGRRUௐOLJKWLQJ

 :KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐ
HGXFDWLRQௐVHFWRUௐLQௐWKHௐSDVWௐWKUHHௐ\HDUV"
ௐRIௐRXUௐVDOHVௐDUHௐWRௐWKHௐHGXFDWLRQௐVHFWRUௐௐ2XUௐVDOHVௐWRௐWKHௐHGXFDWLRQௐVHFWRUௐDUHௐ JHQHUDOO\ௐWRௐFROOHJHௐFDPSXVHVௐWRௐZKHUHௐQHZௐNௐVFKRROVௐDUHௐEHLQJௐEXLOWௐDQGௐWRௐ LPSURYHௐOLJKWLQJௐRQௐH[LVWLQJௐNௐVFKRROௐJURXQGV

 /LVWௐDOOௐVWDWHௐFRRSHUDWLYHௐSXUFKDVLQJௐ
DJUHHPHQWVௐWKDWௐ\RXௐKROGௐ:KDWௐLVௐWKHௐDQQXDOௐ
VDOHVௐYROXPHௐIRUௐHDFKௐRIௐWKHVHௐDJUHHPHQWௐ
RYHUௐWKHௐSDVWௐWKUHHௐ\HDUV"
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐLVௐFXUUHQWO\ௐRQௐ7,36ௐ%X\ௐ%RDUGௐ133ௐௐௐௐFRRSHUDWLYHௐ SURFXUHPHQWVௐZHUHௐWKURXJKௐ%X\%RDUGௐDPRXQWLQJௐWRௐௐLQௐVDOHVௐௐ7KHௐ FKDOOHQJHௐLQௐQRWௐSXWWLQJௐPRUHௐEXVLQHVVௐWKURXJKௐFRRSVௐLVௐZHௐILQGௐPRVWௐRIௐRXUௐ PXQLFLSDOLW\ௐFXVWRPHUVௐXWLOL]Hௐ6RXUFHZHOOௐௐ7KHVHௐFXVWRPHUVௐKDYHௐEHHQௐUHOXFWDQWௐWRௐ DGGௐDGGLWLRQDOௐFRRSHUDWLYHVௐVLJQLILFDQWO\ௐOLPLWLQJௐRXUௐIORZௐRIௐFRRSHUDWLYHௐSURFXUHPHQWௐ EXVLQHVVௐௐ:HௐVHHௐ6RXUFHZHOOௐDVௐEHLQJௐDௐVLJQLILFDQWௐFRQWULEXWRUௐWRௐ)/$ௐDQQXDOௐVDOHVௐ YROXPHௐVKRXOGௐZHௐEHௐVXFFHVVIXOௐLQௐWKLVௐ5)3

 /LVWௐDQ\ௐ*6$ௐFRQWUDFWVௐRUௐ6WDQGLQJௐ2IIHUVௐ
DQGௐ6XSSO\ௐ$UUDQJHPHQWVௐ
626$
ௐWKDWௐ\RXௐ
KROGௐ:KDWௐLVௐWKHௐDQQXDOௐVDOHVௐYROXPHௐIRUௐ
HDFKௐRIௐWKHVHௐFRQWUDFWVௐRYHUௐWKHௐSDVWௐWKUHHௐ
\HDUV"
)RQURFKHௐGRHVௐQRௐKDYHௐDQ\ௐFXUUHQWௐ*6$ௐFRQWUDFWVௐQRUௐDQ\ௐ626$ Vௐௐ0RVWௐRIௐRXUௐ
EXVLQHVVௐLVௐWKURXJKௐORFDOௐJRYHUQPHQWVௐZKRௐZHௐKDYHௐIRXQGௐXWLOL]Hௐ*6$ VௐOHVVௐ
IUHTXHQWO\ௐLQௐRXUௐDUHDௐRIௐIRFXV 
7DEOH%
5HIHUHQFHV7HVWLPRQLDOV
/LQH,WHP 6XSSO\UHIHUHQFHLQIRUPDWLRQIURPWKUHHFXVWRPHUVZKRDUHHOLJLEOHWREH6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHV (QWLW\1DPH
&RQWDFW1DPH
3KRQH1XPEHU
&LW\ௐRIௐ9DOOHMR 2VFDUௐ$OFDQWDU
3XEOLFௐ:RUNVௐ'LUHFWRU
 
&LW\ௐRIௐ6WRFNWRQ &KDGௐ5HHG
3XEOLFௐ:RUNVௐ'LUHFWRU


 
&LW\ௐRIௐ)XOOHUWRQ 6WHSKHQௐ%LVH
3XEOLFௐ:RUNVௐ'LUHFWRU
 
+DUGHHௐ&RXQW\ &KULVWRSKHUௐ6LPSVRQ
$VVLVWDQWௐ&RXQW\ௐ0DQDJHU

7DEOH
$ELOLW\WR6HOODQG'HOLYHU6ROXWLRQV
3RLQWV

'HVFULEH\RXUFRPSDQ\¶VFDSDELOLW\WRPHHWWKHQHHGVRI6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHVDFURVVWKH86DQG&DQDGDDVDSSOLFDEOH<RXU UHVSRQVHVKRXOGDGGUHVVLQGHWDLODWOHDVWWKHIROORZLQJDUHDV ORFDWLRQVRI\RXUQHWZRUNRIVDOHVDQGVHUYLFHSURYLGHUVWKHQXPEHURI ZRUNHUV
IXOOWLPHHTXLYDOHQWV
LQYROYHGLQHDFKVHFWRUZKHWKHUWKHVHZRUNHUVDUH\RXUGLUHFWHPSOR\HHV RUHPSOR\HHVRIDWKLUGSDUW\

DQGDQ\RYHUODSEHWZHHQWKHVDOHVDQGVHUYLFHIXQFWLRQV /LQH
,WHP 4XHVWLRQ 5HVSRQVH 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 111 of 1283 ends

 6DOHVௐIRUFH )RQURFKHௐKDVௐDௐGLUHFWௐVDOHVௐWHDPௐRIௐௐDQGௐDௐPDUN HWLQJௐWHDPௐRIௐௐௐ:HௐKDYHௐKLUHGௐ DௐIXOOௐWLPHௐUHFUXLWHUௐWRௐKLUHௐSULPDULO\ௐLQௐWKHௐDUHDVௐRIௐVDOHVௐDQGௐPDUNHWLQJௐௐ:Hௐ DQWLFLSDWHௐWKHௐVDOHVௐWHDPௐWRௐLQFUHDVHௐWRௐDSSUR[LPDWHO\ௐௐVDOHVௐSHRSOHௐWKURXJKRXWௐ ௐௐ:HௐDUHௐLQௐWKHௐSURFHVVௐRIௐXSGDWLQJௐRXUௐWUDLQLQJௐSURJUDPௐDVVRFLDWHGௐZLWKௐ LQFUHDVLQJௐJURZWKௐUDWHௐௐ)ROORZLQJௐ\HDUVௐRIௐH[SHULHQFHௐZRUNLQJௐZLWKௐLQGHSHQGHQWௐVDOHVௐ UHSUHVHQWDWLRQௐFRPSDQLHVௐGLVWULEXWRUVௐDQGௐDOVRௐKDYLQJௐDௐGLUHFWௐVDOHVௐWHDPௐDQGௐLQௐ SDUWௐEHFDXVHௐVRODUௐOLJKWLQJௐLVௐQRWௐDQௐRIIௐWKHௐVKHOIௐW\SHௐRIௐFRPPRGLW\ௐZHௐKDYHௐIRXQGௐDௐ GLUHFWௐVDOHVௐWHDPௐWRௐEHௐPXFKௐPRUHௐHIIHFWLYHௐWKDQௐHYHQௐDௐPXFKௐODUJHUௐLQGHSHQGHQWௐ UHSUHVHQWDWLYHGLVWULEXWRUௐQHWZRUNௐௐ
7KHௐVDOHVௐWHDPௐZRUNVௐRXWௐRIௐUHJLRQDOௐKXEVௐZKLFKௐZHௐDUHௐJURZLQJௐWKHௐQXPEHUௐRIௐZLWKௐ FXUUHQWௐRQHVௐORFDWHGௐLQௐ/RVௐ$QJHOHVௐ&$ௐ%RLVHௐ,'ௐ3KRHQL[ௐ$=ௐ&RSSHOOௐ7;ௐ6DQௐ $QWRQLRௐ7;ௐ$WODQWDௐ*$ௐ2UODQGRௐ)/ௐ%RVWRQௐ0$ௐௐ:LWKLQௐHDFKௐKXEௐRIILFHௐDUHௐRXWVLGHௐ VDOHVௐSHRSOHௐDORQJௐZLWKௐVDOHVௐVXSSRUWௐSHRSOH
7KLVௐGLUHFWௐVDOHVௐIRUFHௐDUHௐH[SHUWVௐRQௐ)RQURFKHௐDQGௐDUHௐLQௐJUHDWௐSRVLWLRQVௐWRௐIDFLOLWDWHௐ RSWLPDOௐSURFXUHPHQWௐSDWKVௐZKLFKௐSXUFKDVLQJௐWKURXJKௐ6RXUFHZHOOௐZRXOGௐEHௐQRWௐRQO\ௐDQௐ HDV\ௐSURFHVVௐEXWௐDOVRௐDOORZௐIRUௐWKHௐFRQWLQXDWLRQௐRIௐWKHௐGLUHFWௐ)RQURFKHௐWRௐHQGௐXVHUௐ FRQVXOWDWLYHௐEX\LQJௐH[SHULHQFH
)/$ௐIRFXVHVௐKHDYLO\ௐRQௐ/RFDOௐDQGௐ&RXQW\ௐJRYHUQPHQWௐEXVLQHVVௐௐ7KHVHௐDUHௐWKHௐ SULPDU\ௐSXUFKDVHUVௐDQGௐXVHUVௐRIௐVWUHHWௐSDUNLQJௐORWௐSDUNௐDQGௐWUDLOௐOLJKWLQJௐLQௐHYHU\ௐ FRPPXQLW\

 'HVFULEHௐWKHௐQHWZRUNௐRIௐ$XWKRUL]HGௐ6HOOHUVௐ
ZKRௐZLOOௐGHOLYHUௐ6ROXWLRQVௐLQFOXGLQJௐGHDOHUVௐ
GLVWULEXWRUVௐUHVHOOHUVௐDQGௐRWKHUௐGLVWULEXWLRQௐ
PHWKRGV
%HFDXVHௐ)RQURFKHௐKDVௐDௐJURZLQJௐVDOHVௐIRUFHௐFRYHULQJௐ1RUWKௐ$PHULFDௐWKHUHௐLVௐOHVVௐ UHOLDQFHௐRQௐUGௐSDUW\ௐVDOHVௐFKDQQHOVௐOLVWHGௐRQௐWKLVௐTXHVWLRQௐௐ:LWKௐWKDWௐVDLGௐ)RQURFKHௐ GRHVௐKDYHௐVRPHௐGLVWULEXWRUUHVHOOHUௐDJUHHPHQWௐSDUWQHUVௐௐ7KHVHௐDUHௐSULPDULO\ௐWRௐVHUYLFHௐ ORFDOௐPDUNHWVௐ)RQURFKHௐLVௐQRWௐVWURQJௐLQௐEXWௐRXUௐSDUWQHUௐLVௐ:LWKௐWKHVHௐSDUWQHUVௐ )RQURFKHௐFRLQYHVWVௐLQWRௐGHYHORSLQJௐWKHௐWHDPௐDQGௐWKHௐPDUNHWSODFHௐWRௐDVVXUHௐVNLQௐLQௐ WKHௐJDPHௐIRFXVௐRQௐVHOOLQJௐ)RQURFKHௐV\VWHPV

 6HUYLFHௐIRUFH )RQURFKHௐLVௐZRUNLQJௐGLUHFWO\ௐZLWKௐௐQDWLRQDOௐFR QWUDFWRUௐDQGௐPXOWLSOHௐRIௐORFDOௐFRQWUDFWRUVௐ

LQௐHDFKௐVWDWHV
ௐWRௐSURYLGHௐWKHௐLQVWDOODWLRQௐVXSSRUWௐIRUௐRXUௐ6RODUௐVWUHHWOLJKWVௐ%HFDXVHௐ RXUௐOLJKWVௐDUHௐORZௐYROWDJHௐLQVWDOODWLRQௐLVௐXVXDOO\ௐGRQHௐE\ௐODQGVFDSHௐRUௐHOHFWULFDOௐ

FRPSDQLHV


'HVFULEHௐWKHௐRUGHULQJௐSURFHVVௐ,IௐRUGHUVௐZLOOௐ
EHௐKDQGOHGௐE\ௐGLVWULEXWRUVௐGHDOHUVௐRUௐ
RWKHUVௐH[SODLQௐWKHௐUHVSHFWLYHௐUROHVௐRIௐWKHௐ
3URSRVHUௐDQGௐRWKHUV
2XUௐRUGHULQJௐSURFHVVௐLVௐWRௐUHFHLYHௐDௐSXUFKDVHௐRUGHUௐ
32 ௐIRUௐTXRWHGௐPDWHULDOௐRUௐIRUௐ
WKHௐFXVWRPHUௐWRௐVLJQௐWKHௐ)/$ௐTXRWHௐLQௐDEVHQFHௐRIௐRIILFLDOௐFXVWRPHUௐ32ௐSURFHVVௐௐ7KHௐ TXRWHௐDQGௐ32ௐFDQௐEHௐFRPSOHWHGௐZLWKௐDOOௐUHTXLUHGௐ6RXUFHZHOOௐGRFXPHQWDWLRQ   'HVFULEHௐLQௐGHWDLOௐWKHௐSURFHVVௐDQGௐ
SURFHGXUHௐRIௐ\RXUௐFXVWRPHUௐVHUYLFHௐ
SURJUDPௐLIௐDSSOLFDEOHௐௐ,QFOXGHௐ\RXUௐ
UHVSRQVHWLPHௐFDSDELOLWLHVௐDQGௐ
FRPPLWPHQWVௐDVௐZHOOௐDVௐDQ\ௐLQFHQWLYHVௐWKDWௐ
KHOSௐ\RXUௐSURYLGHUVௐPHHWௐ\RXUௐVWDWHGௐ
VHUYLFHௐJRDOVௐRUௐSURPLVHV
&XVWRPHUௐVHQGVௐUHTXHVWௐWRௐVXSSRUW#IRQURFKHXVௐ
'ௐGD\
ௐௐ6XSSRUWௐZLOOௐDQDO\]HௐDQGௐ
WUDQVIHUௐWRௐWKHௐDVVRFLDWHGௐGHSDUWPHQWௐVDPHௐGD\ௐ
'ௐGD\
ௐ$VVRFLDWHGௐVHUYLFHௐZLOOௐVHQGௐ
UHSODFHPHQWௐSDUWௐ
'ௐGD\ௐ
ௐௐ)RQURFKHௐ&XVWRPHUௐ6HUYLFHௐZLOOௐRUJDQL]HௐDௐSLFNௐXSௐRIௐ IDLOHGௐSDUWௐWRௐEHௐVHQWௐWRௐ)RQURFKHௐIRUௐDQDO\VLVௐ
'ௐGD\ௐ
ௐௐ4XDOLW\ௐGHSDUWPHQWௐZLOOௐ
RSHQௐDௐTXDOLW\ௐWRROௐWRௐGHILQHௐDFWLRQௐSODQௐWRௐHOLPLQDWHௐWKHௐQRQFRQIRUPLW\ௐLQௐWKHௐIXWXUHௐ 'ௐ
GD\ௐ


 'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐ
SURYLGHௐ\RXUௐSURGXFWVௐDQGௐVHUYLFHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHௐ
8QLWHGௐ6WDWHV
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐKDVௐIXOOௐDELOLW\ௐDQGௐFRPSOHWHௐZLOOLQJQHVVௐWRௐSURYLGHௐRXUௐ SURGXFWVௐDQGௐVHUYLFHVௐWRௐDOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHௐ8QLWHGௐ6WDWHV   'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐ
SURYLGHௐ\RXUௐSURGXFWVௐDQGௐVHUYLFHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐ&DQDGD
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐKDVௐIXOOௐDELOLW\ௐDQGௐFRPSOHWHௐZLOOLQJQHVVௐWRௐSURYLGHௐRXUௐ SURGXFWVௐDQGௐVHUYLFHVௐWRௐDOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHௐ&DQDGD   ,GHQWLI\ௐDQ\ௐJHRJUDSKLFௐDUHDVௐRIௐWKHௐ8QLWHGௐ
6WDWHVௐRUௐ&DQDGDௐWKDWௐ\RXௐZLOOௐ127ௐEHௐIXOO\ௐ
VHUYLQJௐWKURXJKௐWKHௐSURSRVHGௐDJUHHPHQW
7KHUHௐDUHௐ12ௐDUHDVௐZHௐZLOOௐQRWௐEHௐDEOHௐWRௐIXOO\ௐVHUYLFHௐWKURXJKௐWKLVௐSURSRVHGௐ DJUHHPHQW 
 ,GHQWLI\ௐDQ\ௐDFFRXQWௐW\SHௐRIௐ3DUWLFLSDWLQJௐ
(QWLW\ௐZKLFKௐZLOOௐQRWௐKDYHௐIXOOௐDFFHVVௐWRௐ
\RXUௐ6ROXWLRQVௐLIௐDZDUGHGௐDQௐDJUHHPHQWௐ
DQGௐWKHௐUHDVRQLQJௐIRUௐWKLV
7KHUHௐDUHௐ12ௐDFFRXQWௐW\SHVௐIURPௐDQ\ௐ3DUWLFLSDWLQJௐ(QWLW\ௐWKDWௐZLOOௐQRWௐKDYHௐIXOOௐDFFHVVௐ WRௐDOOௐ)RQURFKHௐVROXWLRQV 
 'HILQHௐDQ\ௐVSHFLILFௐUHTXLUHPHQWVௐRUௐ
UHVWULFWLRQVௐWKDWௐZRXOGௐDSSO\ௐWRௐRXUௐ
SDUWLFLSDWLQJௐHQWLWLHVௐLQௐ+DZDLLௐDQGௐ$ODVNDௐ
DQGௐLQௐ86ௐ7HUULWRULHV
7KHUHௐDUHௐQRௐVSHFLILFௐEXVLQHVVௐUHODWHGௐUHTXLUHPHQWௐQRUௐDQ\ௐUHVWULFWLRQVௐLQௐVHUYLFLQJௐ +DZDLLௐ$ODVNDௐRUௐ86ௐ7HUULWRULHVௐ7KHௐRQO\ௐUHVWULFWLRQௐLQௐ$ODVNDௐLVௐDௐWHFKQLFDOௐRQHௐ UHODWHGௐWRௐKRZௐPXFKௐVRODUௐLUUDGLDWLRQௐRFFXUVௐLQௐWKHௐZLQWHUௐPRQWKVௐௐIURPௐDௐVRODUௐ LUUDGLDQFHௐVWDQGSRLQWௐ$ODVNDௐLVௐPRUHௐUHVWULFWLYHௐWKDQௐ$UL]RQDௐLQௐV\VWHPௐVL]LQJௐ FDSDELOLWLHV

 :LOOௐ3URSRVHUௐH[WHQGௐWHUPVௐRIௐDQ\ௐDZDUGHGௐ
PDVWHUௐDJUHHPHQWௐWRௐQRQSURILWௐHQWLWLHV"
<HVௐ)RQURFKHௐZLOOௐH[WHQGௐWHUPVௐRIௐDQ\ௐDZDUGHGௐPDVWHUௐDJUHHPHQWௐWRௐQRQSURILWௐHQWLWLHV  Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 112 of 1283 ends

7DEOH
0DUNHWLQJ3ODQ
3RLQWV

/LQH
,WHP 4XHVWLRQ 5HVSRQVH 
 'HVFULEHௐ\RXUௐPDUNHWLQJௐVWUDWHJ\ௐIRUௐ
SURPRWLQJௐWKLVௐRSSRUWXQLW\ௐௐ8SORDGௐ
UHSUHVHQWDWLYHௐVDPSOHVௐRIௐ\RXUௐ
PDUNHWLQJௐPDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐ
WKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐWDUJHWVௐORFDOௐJRYHUQPHQWௐDQGௐDGMDFHQWௐVHJPHQWVௐLQFOXGLQJௐ 6FKRROௐ'LVWULFWVௐ5HWDLOHUVௐ7UDQVSRUWDWLRQௐDQGௐ)HGHUDOௐ$JHQFLHV (PDLO
ௐ)RQURFKHௐ/LJKWLQJௐPDLQWDLQVௐDௐFRQWDFWௐGDWDEDVHௐRIௐDURXQGௐௐFRQWDFWVௐLQFOXGLQJௐ FXVWRPHUVௐSURVSHFWVௐUHVHOOHUVௐDQGௐLQGXVWU\ௐH[SHUWVௐௐ)RQURFKHௐZLOOௐVHQGௐDQௐLQLWLDOௐHPDLOௐ DQQRXQFHPHQWௐZLWKௐDXWRPDWHGௐIROORZௐDQGௐWZRௐDGGLWLRQDOௐURXQGVௐSHUௐ\HDU (PDLOௐWRௐSXUFKDVHGௐOLVWௐRIௐORFDOௐJRYHUQPHQWVௐZLWKௐDௐSRSXODWLRQௐRIௐJUHDWHUௐWKDQௐ :HEVLWH
ௐ
)RQURFKHௐ/LJKWLQJௐZLOOௐSURYLGHௐDௐUHFLSURFDOௐOLQNௐRQௐWKUHHௐZHEVLWHௐSDJHVௐLQFOXGLQJௐ )RQURFKH6RODU/LJKWLQJFRPௐ)RQURFKH6RODU/LJKWLQJFRPFRPPHUFLDOVRODU OLJKWLQJ)RQURFKH6RODU/LJKWLQJKRZWREX\
$UWLFOH
ௐ)RQURFKHௐ/LJKWLQJௐZLOOௐSXEOLVKௐDQௐDUWLFOHௐDERXWௐLWVௐUHODWLRQVKLSௐZLWKௐ6RXUFHZHOOௐDQGௐ WKHௐEHQHILWVௐRIௐEX\LQJௐWKURXJKௐ6RXUFHZHOOௐௐ
6RFLDOௐ0HGLD

/LQNHG,Qௐ)DFHERRNௐDQGௐ,QVWDJUDPௐSRVWVௐZLOOௐVXSSRUWௐZHEVLWHௐDQQRXQFHPHQWௐ5HPLQGHUௐ SRVWVௐZLOOௐEHௐWLPHGௐZLWKௐVHFRQGௐDQGௐWKLUGௐURXQGௐHPDLOௐEODVWV 3ULQWHGௐDQGௐ,QWHUDFWLYHௐ&ROODWHUDO
ௐ6RXUFHZHOO¶VௐORJRௐZLOOௐEHௐIHDWXUHGௐRQௐSULQWHGௐLQWHUDFWLYHௐ EURFKXUHV
7UDGHVKRZV
ௐ)RQURFKHௐ/LJKWLQJௐZLOOௐH[KLELWௐDWௐௐORFDOௐJRYHUQPHQWௐDQGௐSXEOLFௐZRUNVௐHYHQWVௐ LQௐௐௐ([KLELWVௐZLOOௐLQFOXGHௐDௐ6RXUFHZHOOௐWDEOHௐGLVSOD\ௐZLWKௐDௐ45ௐ&RGHௐOLQNௐௐ'LVWULEXWLRQௐ RIௐPDWHULDOௐSURYLGHGௐE\ௐ6RXUFHZHOOௐLVௐDYDLODEOHௐDVௐZHOO 
 'HVFULEHௐ\RXUௐXVHௐRIௐWHFKQRORJ\ௐDQGௐ
GLJLWDOௐGDWDௐ
HJௐVRFLDOௐPHGLDௐ
PHWDGDWDௐXVDJH
ௐWRௐHQKDQFHௐ
PDUNHWLQJௐHIIHFWLYHQHVV
)RQURFKHௐ/LJKWLQJௐLQWHJUDWHVௐDQGௐPHDVXUHVௐLWVௐOHDGௐJHQHUDWLRQௐDQGௐRSSRUWXQLW\ௐDFWLYLWLHVௐ XVLQJௐ6DOHV)RUFHFRPௐௐ:HௐDOVRௐXVHௐ/HDGௐ)RUHQVLFVௐWRௐWUDFNௐPHWDGDWDௐDOHUWௐVDOHVௐUHSVௐWRௐ DFWLYHௐZHEVLWHௐYLVLWRUVௐDQGௐWRௐOLQNௐZHEVLWHௐYLVLWVௐWRௐRXWERXQGௐPDUNHWLQJௐDFWLYLWLHVௐVXFKௐDVௐ WUDGHVKRZV


,Qௐ\RXUௐYLHZௐZKDWௐLVௐ6RXUFHZHOO¶VௐUROHௐ
LQௐSURPRWLQJௐDJUHHPHQWVௐDULVLQJௐRXWௐRIௐ
WKLVௐ5)3"ௐ+RZௐZLOOௐ\RXௐLQWHJUDWHௐDௐ
6RXUFHZHOODZDUGHGௐDJUHHPHQWௐLQWRௐ
\RXUௐVDOHVௐSURFHVV"
:HௐEHOLHYHௐWKDWௐ6RXUFHZHOO¶VௐUROHௐLQௐSURPRWLQJௐDJUHHPHQWVௐDULVLQJௐRXWௐRIௐWKLVௐ5)3ௐLVௐWRௐ SURYLGHௐEUDQGௐJXLGHOLQHVௐDQGௐNH\ௐPHVVDJLQJௐDVௐZHOOௐDVௐWRௐDPSOLI\ௐVXFFHVVௐVWRULHVௐDQGௐ FDVHௐVWXGLHVௐSURYLGHGௐE\ௐ)RQURFKHௐ/LJKWLQJௐௐ7KHVHௐPDWHULDOVௐZLOOௐDOVRௐEHௐXVHGௐE\ௐRXUௐ VDOHVௐWHDPௐWRௐHQFRXUDJHௐXWLOL]DWLRQௐRIௐ6RXUFHZHOO¶VௐVHUYLFHVௐௐ7RௐIDFLOLWDWHௐSDUWLFLSDWLRQௐWKHௐ VDOHVௐWHDPௐZLOOௐKDYHௐDFFHVVௐWRௐFXVWRPL]HGௐSULFHௐOLVWVௐDQGௐTXRWDWLRQௐWRROVௐZLWKLQௐ6DOHVIRUFH 
 $UHௐ\RXUௐ6ROXWLRQVௐDYDLODEOHௐWKURXJKௐ
DQௐHSURFXUHPHQWௐRUGHULQJௐSURFHVV"ௐ,Iௐ
VRௐGHVFULEHௐ\RXUௐHSURFXUHPHQWௐ
V\VWHPௐDQGௐKRZௐJRYHUQPHQWDOௐDQGௐ
HGXFDWLRQDOௐFXVWRPHUVௐKDYHௐXVHGௐLW
2XUௐVROXWLRQVௐDUHௐQRWௐDYDLODEOHௐYLDௐHSURFXUHPHQW

7DEOH$
9DOXH$GGHG$WWULEXWHV
3RLQWVDSSOLHVWR7DEOH$DQG%

/LQH
,WHP 4XHVWLRQ 5HVSRQVH 
 'HVFULEHௐDQ\ௐSURGXFWௐHTXLSPHQWௐ
PDLQWHQDQFHௐRUௐRSHUDWRUௐWUDLQLQJௐ
SURJUDPVௐWKDWௐ\RXௐRIIHUௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐ
,QFOXGHௐGHWDLOVௐVXFKௐDVௐZKHWKHUௐ
WUDLQLQJௐLVௐVWDQGDUGௐRUௐRSWLRQDOௐ
ZKRௐSURYLGHVௐWUDLQLQJௐDQGௐDQ\ௐ
FRVWVௐWKDWௐDSSO\
)RQURFKHௐV\VWHPVௐDUHௐODUJHO\ௐSOXJQSOD\ௐIRUௐFXVWRPHUVௐௐ:LWKௐWKDWௐVDLGௐ)RQURFKHௐKDVௐDQௐ LQVWDOODWLRQௐVXSSRUWௐWHDPௐWRௐPDNHௐVXUHௐLQVWDOODWLRQVௐJRௐSHUIHFWO\ௐௐ:HௐKDYHௐDQௐLQVWDOODWLRQௐ VXSSRUWௐPDQDJHUௐZKRௐKDQGOHVௐSUHLQVWDOODWLRQௐFRRUGLQDWLRQௐZLWKௐORFDOௐFRQWUDFWRUVௐWRௐPDNHௐVXUHௐ HYHU\WKLQJௐLVௐZHOOௐXQGHUVWRRGௐDQGௐOLQHGௐRXWௐSULRUௐWRௐLQVWDOODWLRQௐௐ,QௐDGGLWLRQௐWRௐWKDWௐIRUௐODUJHUௐ SURMHFWVௐDQGௐVWUDWHJLFௐFXVWRPHUVௐZHௐVHQGௐDQௐLQVWDOODWLRQௐVXSSRUWௐWHDPௐWRௐKHOSௐIDFLOLWDWHௐDௐ VPRRWKௐLQVWDOODWLRQௐௐW\SLFDOO\ௐWKLVௐHQWDLOVௐSUHDVVHPEOLQJௐWKHௐVPDUWௐOLJKWVௐRQVLWHௐWRௐWKHQௐEHௐ KRLVWHGௐDQGௐSODFHGௐRQௐWKHௐSROHVௐௐ:HௐDOVRௐKDYHௐDQௐLQVWDOODWLRQௐPDQXDOௐVHQWௐRXWௐRQௐHYHU\ௐ SURMHFWௐௐ)RQURFKHௐGRHVௐQRWௐFKDUJHௐIRUௐLQVWDOODWLRQௐVXSSRUWௐDQGௐWUDLQLQJௐ2XUௐVWUDWHJ\ௐLVௐZHௐ DUHௐLQௐWKLVௐIRUௐWKHௐORQJௐWHUPௐDQGௐLWௐLVௐLPSRUWDQWௐIRUௐXVௐWRௐEXLOGௐUDSSRUWௐDQGௐWUXVWௐZLWKௐ FXVWRPHUVௐWRௐPDNHௐLWௐHDV\ௐWRௐEX\ௐHDV\ௐWRௐLQVWDOOௐHDV\ௐWRௐXVH 
 'HVFULEHௐDQ\ௐWHFKQRORJLFDOௐ
DGYDQFHVௐWKDWௐ\RXUௐSURSRVHGௐ

VROXWLRQ
V
ௐRIIHU
)RQURFKHௐLVௐWKHௐRQO\ௐPDQXIDFWXUHUௐLQௐWKHௐ:RUOGௐWRௐXVHௐ1LFNHOௐ0HWDOௐ+\GULGHௐ%DWWHULHVௐ

1L0+
ௐௐ7KHௐWHFKQRORJLFDOௐDGYDQFHPHQWௐRIௐWKLVௐLVௐ1L0+ௐLVௐWKHௐPRVWௐUREXVWௐEDWWHU\ௐW\SHௐ RSHUDWLQJௐZHOOௐLQௐERWKௐKRWௐDQGௐFROGௐFOLPDWHVௐZLWKௐDௐOLIHVSDQௐRIௐௐ\HDUVௐ&RQYHUVHO\ௐ OLWKLXPௐEDWWHU\ௐWHFKQRORJ\ௐKDVௐVLPLODUௐOLIHௐEXWௐOLWKLXPௐGRHVௐQRWௐSHUIRUPௐZHOOௐLQௐKRWௐQRUௐFROGௐ FOLPDWHVௐௐ7KHௐUHDVRQௐ)RQURFKHௐLVௐWKHௐRQO\ௐPDQXIDFWXUHUௐDEOHௐWRௐPDQDJHௐFRUUHFWO\ௐWKHௐWZRௐ W\SHVௐRIௐEDWWHULHVௐGXHௐWRௐDௐYHU\ௐJRRGௐEDWWHU\ௐV\VWHPௐPDQDJHPHQW 
 ,IௐDSSOLFDEOHௐGHVFULEHௐKRZௐ\RXUௐ

VROXWLRQ
V
ௐOHYHUDJHௐDUWLILFLDOௐ
LQWHOOLJHQFHௐ
$,
ௐWRௐHQKDQFHௐWKHௐ
IXQFWLRQDOLW\ௐDQGௐHIILFLHQF\ௐRIௐVPDUWௐ
LQIUDVWUXFWXUH
:HௐDUHௐXVLQJௐ$,ௐWRௐDQWLFLSDWHௐZHDWKHUௐLQௐRUGHUௐWRௐEXLOGௐDOJRULWKPVௐWKDWௐDUHௐDOLJQHGௐZLWKௐ ZHDWKHUௐGDWDௐRYHUௐWKHௐODVWௐௐ\HDUVௐௐ:LWKௐ$,ௐZHௐFDQௐDQWLFLSDWHௐZHDWKHUௐDQGௐGLVFKDUJH 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 113 of 1283 ends

 'HVFULEHௐDQ\ௐ³JUHHQ´ௐLQLWLDWLYHVௐ
WKDWௐUHODWHௐWRௐ\RXUௐFRPSDQ\ௐRUௐWRௐ
\RXUௐ6ROXWLRQVௐDQGௐLQFOXGHௐDௐOLVWௐ
RIௐWKHௐFHUWLI\LQJௐDJHQF\ௐIRUௐHDFK
ௐௐ6RODU3RZHUHGௐ6WUHHWOLJKWLQJ
,QLWLDWLYH
ௐ$OOௐ)RQURFKHௐVWUHHWOLJKWVௐDUHௐSRZHUHGௐE\ௐVRODUௐHQHUJ\ௐUHPRYLQJௐGHSHQGHQFHௐRQௐ IRVVLOௐIXHOVௐDQGௐORZHULQJௐJUHHQKRXVHௐJDVௐHPLVVLRQV
,PSDFW
ௐ6DYHVௐWKRXVDQGVௐRIௐNLORZDWWKRXUVௐDQQXDOO\ௐSHUௐLQVWDOODWLRQ &HUWLI\LQJௐ$JHQF\

6RODUௐ5DWLQJௐ ௐ&HUWLILFDWLRQௐ&RUSRUDWLRQௐ
65&&
ௐ±ௐ&RPSOLDQFHௐZLWKௐVRODUௐSHUIRUPDQFHௐ
VWDQGDUGV
ௐ2II*ULGௐ,QIUDVWUXFWXUHௐ'HYHORSPHQW
,QLWLDWLYH
ௐ2XUௐVROXWLRQVௐGRௐQRWௐUHTXLUHௐWUHQFKLQJௐFDEOLQJௐRUௐFRQQHFWLRQௐWRௐWKHௐJULGௐZKLFKௐ KHOSVௐSUHVHUYHௐQDWXUDOௐODQGVFDSHVௐDQGௐUHGXFHௐFRQVWUXFWLRQUHODWHGௐHPLVVLRQV ,PSDFW
ௐ/RZHUVௐLQVWDOODWLRQௐIRRWSULQWௐDQGௐSURWHFWVௐJUHHQௐVSDFHV &HUWLI\LQJௐ$JHQF\

(QYLURQPHQWDOௐ3URWHFWLRQௐ$JHQF\ௐ
(3$
ௐ±ௐ,QGLUHFWO\ௐDOLJQVௐZLWKௐ(3$ௐJXLGHOLQHVௐIRUௐVXVWDLQDEOHௐ GHYHORSPHQW
ௐ5HF\FODEOHௐDQGௐ6XVWDLQDEOHௐ&RPSRQHQWV
,QLWLDWLYH
ௐ)RQURFKHௐOLJKWVௐXVHௐUHF\FODEOHௐPDWHULDOVௐVXFKௐDVௐDOXPLQXPௐSROHVௐDQGௐ/L)H32ௐ EDWWHULHVௐZKLFKௐDUHௐORQJHUODVWLQJௐDQGௐOHVVௐWR[LFௐWKDQௐWUDGLWLRQDOௐEDWWHU\ௐFKHPLVWULHV ,PSDFW
ௐ3URPRWHVௐDௐFLUFXODUௐHFRQRP\ௐDQGௐPLQLPL]HVௐZDVWH
ௐ6PDUWௐ(QHUJ\ௐ0DQDJHPHQWௐ6\VWHPௐ
(06

,QLWLDWLYH
ௐ(DFKௐXQLWௐLVௐHTXLSSHGௐZLWKௐDQௐ(06ௐWKDWௐRSWLPL]HVௐEDWWHU\ௐXVDJHௐDQGௐDGDSWVௐ OLJKWLQJௐSURILOHVௐWRௐUHGXFHௐHQHUJ\ௐFRQVXPSWLRQ
,PSDFW
ௐ([WHQGVௐEDWWHU\ௐOLIHௐDQGௐHQVXUHVௐHIILFLHQWௐVRODUௐXVDJH 
 ,GHQWLI\ௐDQ\ௐWKLUGSDUW\ௐLVVXHGௐHFR
ODEHOVௐUDWLQJVௐRUௐFHUWLILFDWLRQVௐWKDWௐ
\RXUௐFRPSDQ\ௐKDVௐUHFHLYHGௐIRUௐWKHௐ
6ROXWLRQVௐLQFOXGHGௐLQௐ\RXUௐ3URSRVDOௐ
UHODWHGௐWRௐHQHUJ\ௐHIILFLHQF\ௐRUௐ
FRQVHUYDWLRQௐOLIHF\FOHௐGHVLJQௐ

FUDGOHWRFUDGOH
ௐRUௐRWKHUௐ
JUHHQVXVWDLQDELOLW\ௐIDFWRUV
&5,7,&$/ௐ5(9,(:ௐ$77(67$7,21ௐEXUHDXௐ9HULWDVௐ
/LIHௐF\FOHௐDVVHVVPHQWௐ
/&$
ௐRIௐ6PDUWOLJKWௐௐ6HSWHPEHUௐௐYHUVLRQ
'DUNௐ6N\ௐ&RPSOLDQW 
 :KDWௐXQLTXHௐDWWULEXWHVௐGRHVௐ\RXUௐ
FRPSDQ\ௐ\RXUௐSURGXFWVௐRUௐ\RXUௐ
VHUYLFHVௐRIIHUௐWRௐ6RXUFHZHOOௐ
SDUWLFLSDWLQJௐHQWLWLHV"ௐ:KDWௐPDNHVௐ
\RXUௐSURSRVHGௐVROXWLRQVௐXQLTXHௐLQௐ
\RXUௐLQGXVWU\ௐDVௐLWௐDSSOLHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHV"
)RQURFKHௐGHOLYHUVௐDௐFRPSOHWHௐLQWHJUDWHGௐVRODUௐVWUHHWOLJKWௐV\VWHP²LQFOXGLQJௐDௐSRZHUIXOௐEDWWHU\ௐ KLJKHIILFLHQF\ௐVRODUௐSDQHOௐDQGௐVPDUWௐHQHUJ\ௐPDQDJHPHQWௐV\VWHP 1RௐWUHQFKLQJௐ1RௐZLULQJௐ1RௐJULG
7KLVௐPHDQVௐVLJQLILFDQWௐFRVWௐVDYLQJVௐDQGௐIDVWHUௐGHSOR\PHQWௐHVSHFLDOO\ௐDWWUDFWLYHௐIRUௐSXEOLFௐ DJHQFLHVௐZLWKௐWLJKWௐEXGJHWVௐDQGௐWLPHOLQHV
ௐ,QGXVWU\/HDGLQJௐ%DWWHU\ௐ7HFKQRORJ\
2XUௐSURSULHWDU\ௐ1L0+ௐHQHUJ\ௐVWRUDJHௐLVௐXQPDWFKHGௐLQௐOLIHVSDQௐ XSௐWRௐௐ\HDUV
ௐWHPSHUDWXUHௐ
UHVLVWDQFHௐ
ƒ)ௐWRௐƒ)
ௐDQGௐQLJKWWLPHௐUHOLDELOLW\

Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 114 of 1283 ends

7DEOH%
9DOXH$GGHG$WWULEXWHV
/LQH
,WHP 4XHVWLRQ &HUWLILFDW LRQ 2IIHUHG &RPPHQW
 6HOHFWௐDQ\ௐ:RPHQௐ
RUௐ0LQRULW\ௐ%XVLQHVVௐ
(QWLW\ௐ
:0%(
ௐ6PDOOௐ
%XVLQHVVௐ(QWLW\ௐ

6%(
ௐRUௐYHWHUDQௐ
RZQHGௐEXVLQHVVௐ
FHUWLILFDWLRQVௐWKDWௐ\RXUௐ
FRPSDQ\ௐRUௐKXEௐ
SDUWQHUVௐKDYHௐ
REWDLQHGௐ8SORDGௐ
GRFXPHQWDWLRQௐDQGௐDௐ
OLVWLQJௐRIௐGHDOHUVKLSVௐ
+8%ௐSDUWQHUVௐRUௐUH
VHOOHUVௐLIௐDYDLODEOHௐ
6HOHFWௐDOOௐWKDWௐDSSO\

<HV
1R
1$

  0LQRULW\ௐ%XVLQHVVௐ
(QWHUSULVHௐ
0%(

<HV
1R
1$ 

 :RPHQௐ%XVLQHVVௐ
(QWHUSULVHௐ
:%(

<HV
1R
1$ 
  'LVDEOHG2ZQHGௐ
%XVLQHVVௐ(QWHUSULVHௐ

'2%(

<HV
1R
1$

  9HWHUDQ2ZQHGௐ
%XVLQHVVௐ(QWHUSULVH

9%(

<HV
1R
1$

  6HUYLFH'LVDEOHGௐ
9HWHUDQ2ZQHGௐ
%XVLQHVV

6'92%

<HV
1R
1$

  6PDOOௐ%XVLQHVVௐ
(QWHUSULVHௐ
6%(

<HV
1R
1$ 
  6PDOOௐ'LVDGYDQWDJHGௐ
%XVLQHVVௐ
6'%

<HV
1R
1$ 
  :RPHQ2ZQHGௐ6PDOOௐ
%XVLQHVVௐ
:26%

<HV
1R
1$ 
7DEOH$
3ULFLQJ
3RLQWVDSSOLHVWR7DEOH$DQG%

3URYLGHGHWDLOHGSULFLQJLQIRUPDWLRQLQWKHTXHVWLRQVWKDWIROORZEHORZ /LQH
,WHP 4XHVWLRQ 5HVSRQVH 
 'HVFULEHௐ\RXUௐSD\PHQWௐWHUPVௐDQGௐDFFHSWHGௐSD\PHQWௐ
PHWKRGV
:HௐDUHௐIOH[LEOHௐRQௐSD\PHQWௐWHUPVௐGHSHQGLQJௐRQௐFUHGLWௐZRUWKLQHVVௐRIௐ EX\HUௐௐ:HௐGRௐDௐFUHGLWௐFKHFNௐRQௐDOOௐEX\HUVௐJHQHUDOO\ௐWKURXJKௐ &RIDFHௐௐ'HSHQGLQJௐRQௐFUHGLWௐZRUWKLQHVVௐSD\PHQWௐWHUPVௐDUHௐQHWௐௐ GD\VௐIURPௐVKLSPHQWௐWRௐDௐSDUWLDOௐGRZQௐSD\PHQWௐWRௐIXOOௐSD\PHQWௐSULRUௐ WRௐVKLSPHQW

 'HVFULEHௐDQ\ௐOHDVLQJௐRUௐILQDQFLQJௐRSWLRQVௐDYDLODEOHௐIRUௐXVHௐ E\ௐHGXFDWLRQDOௐRUௐJRYHUQPHQWDOௐHQWLWLHV
)RQURFKHௐKDVௐILQDQFLQJௐRSWLRQVௐIRUௐFXVWRPHUVௐௐ*HQHUDOO\ௐWKLVௐLVௐIRUௐ ODUJHௐYROXPHௐSURFXUHPHQWௐWRௐDௐFLW\ௐௐ7KHௐZD\ௐLWௐZRUNVௐLVௐWKHௐFLW\ௐ SD\VௐDௐPRQWKO\ௐSHUௐOLJKWௐIHHௐIRUௐௐ\HDUVௐDQGௐWKHQௐWKH\ௐRZQௐWKHௐ LQIUDVWUXFWXUHௐௐ'XULQJௐWKLVௐSHULRGௐ)RQURFKHௐWDNHVௐFDUHௐRIௐௐRIௐ WKHௐPDLQWHQDQFHௐRIௐWKHௐDJHQF\ௐOLJKWLQJ

 'HVFULEHௐDQ\ௐVWDQGDUGௐWUDQVDFWLRQௐGRFXPHQWVௐWKDWௐ\RXௐ SURSRVHௐWRௐXVHௐLQௐFRQQHFWLRQௐZLWKௐDQௐDZDUGHGௐDJUHHPHQWௐ

RUGHUௐIRUPVௐWHUPVௐDQGௐFRQGLWLRQVௐVHUYLFHௐOHYHOௐ
DJUHHPHQWVௐHWF
ௐ8SORDGௐDOOௐWHPSODWHௐDJUHHPHQWVௐRUௐ
WUDQVDFWLRQௐGRFXPHQWVௐZKLFKௐPD\ௐEHௐSURSRVHGௐWRௐ
3DUWLFLSDWLQJௐ(QWLWLHV
2UGHUௐ)RUPௐ±ௐ6XPPDUL]HVௐSURGXFWௐGHWDLOVௐSULFLQJௐTXDQWLWLHVௐGHOLYHU\ௐ WLPHOLQHVௐDQGௐUHIHUHQFHௐWRௐWKHௐJRYHUQLQJௐDJUHHPHQW
7HUPVௐDQGௐ&RQGLWLRQVௐ±ௐ2XUௐVWDQGDUGௐ7 &VௐFRYHUௐZDUUDQW\ௐSD\PHQWௐ WHUPVௐGHOLYHU\ௐREOLJDWLRQVௐULVNௐRIௐORVVௐOLPLWDWLRQVௐRIௐOLDELOLW\ௐDQGௐ GLVSXWHௐUHVROXWLRQ


'Rௐ\RXௐDFFHSWௐWKHௐ3FDUGௐSURFXUHPHQWௐDQGௐSD\PHQWௐ
SURFHVV"ௐ,IௐVRௐLVௐWKHUHௐDQ\ௐDGGLWLRQDOௐFRVWௐWRௐ6RXUFHZHOOௐ SDUWLFLSDWLQJௐHQWLWLHVௐIRUௐXVLQJௐWKLVௐSURFHVV"
:HௐGRௐQRWௐDFFHSWௐ3FDUGௐSURFXUHPHQWௐௐ:HௐKDYHௐRXUௐRZQௐFUHGLWௐ FDUGௐVHUYLFHௐZHௐUXQௐWKURXJKௐௐ*HQHUDOO\ௐZHௐILQGௐRXUௐFXVWRPHUVௐDUHௐ QRWௐZDQWLQJௐWRௐXVHௐ3FDUGௐSURFXUHPHQWௐZKLFKௐLVௐWKHௐPDLQௐUHDVRQௐZHௐ GRௐQRWௐRIIHUௐLWௐ3ULPDULO\ௐSD\PHQWVௐDUHௐPDGHௐWKURXJKௐ$&+ௐWUDQVIHU 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 115 of 1283 ends

 'HVFULEHௐ\RXUௐSULFLQJௐPRGHOௐ
HJௐOLQHLWHPௐGLVFRXQWVௐRUௐ
SURGXFWFDWHJRU\ௐGLVFRXQWV
ௐ3URYLGHௐGHWDLOHGௐSULFLQJௐGDWDௐ

LQFOXGLQJௐVWDQGDUGௐRUௐOLVWௐSULFLQJௐDQGௐWKHௐ6RXUFHZHOOௐ
GLVFRXQWHGௐSULFH
ௐRQௐDOOௐRIௐWKHௐLWHPVௐWKDWௐ\RXௐZDQWௐ
6RXUFHZHOOௐWRௐFRQVLGHUௐDVௐSDUWௐRIௐ\RXUௐ5)3ௐUHVSRQVHௐ,Iௐ DSSOLFDEOHௐSURYLGHௐDௐ6.8ௐIRUௐHDFKௐLWHPௐLQௐ\RXUௐSURSRVDOௐ 8SORDGௐ\RXUௐSULFLQJௐPDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐWKHௐ
GRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
3ULFLQJௐ0RGHO
ௐ/LQHௐLWHPௐGLVFRXQW
3URYLGHௐGHWDLOHGௐSULFLQJௐGDWD
ௐ3ULFHௐOLVWௐZLOOௐEHௐDWWDFKHGௐLQௐWKHௐ
SURSRVDOௐLWௐZLOOௐLQFOXGHௐWKHௐௐGLVFRXQWௐIRUௐ6RXUFHZHOOௐPHPEHUV 
 4XDQWLI\ௐWKHௐSULFLQJௐGLVFRXQWௐUHSUHVHQWHGௐE\ௐWKHௐSULFLQJௐ SURSRVDOௐLQௐWKLVௐUHVSRQVHௐ)RUௐH[DPSOHௐLIௐWKHௐSULFLQJௐLQௐ \RXUௐUHVSRQVHௐUHSUHVHQWVௐDௐSHUFHQWDJHௐGLVFRXQWௐIURPௐ
0653ௐRUௐOLVWௐVWDWHௐWKHௐSHUFHQWDJHௐRUௐSHUFHQWDJHௐUDQJH <HVௐSULFLQJௐLQௐELGௐUHIOHFWVௐGLVFRXQWHGௐSULFLQJௐORZHUௐWKDQௐFXUUHQWO\ௐ LQFUHDVLQJௐSULFHௐௐ&XUUHQWௐSULFHௐLQFUHDVHௐLQௐSURJUHVVௐZLOOௐEHௐDQௐ LQFUHDVHௐRIௐ 
 'HVFULEHௐDQ\ௐTXDQWLW\ௐRUௐYROXPHௐGLVFRXQWVௐRUௐUHEDWHௐ SURJUDPVௐWKDWௐ\RXௐRIIHU
)RQURFKHௐSULFLQJௐDUHௐEDVHGௐRQௐYROXPH
3ULFHௐUDQJHௐLV
ௐ
ௐWRௐௐ
ௐWRௐ
ௐௐWRௐ

 3URSRVHௐDௐPHWKRGௐRIௐIDFLOLWDWLQJௐ³VRXUFHG´ௐSURGXFWVௐRUௐ UHODWHGௐVHUYLFHVௐZKLFKௐPD\ௐEHௐUHIHUUHGௐWRௐDVௐ³RSHQௐ
PDUNHW´ௐLWHPVௐRUௐQRQFRQWUDFWHGௐLWHPVௐ)RUௐH[DPSOHௐ\RXௐ PD\ௐVXSSO\ௐVXFKௐLWHPVௐ³DWௐFRVW´ௐRUௐ³DWௐFRVWௐSOXVௐDௐ
SHUFHQWDJH´ௐRUௐ\RXௐPD\ௐVXSSO\ௐDௐTXRWHௐIRUௐHDFKௐVXFKௐ
UHTXHVW
7RௐIDFLOLWDWHௐ³VRXUFHG´ௐSURGXFWVௐRUௐUHODWHGௐVHUYLFHVௐ)RQURFKHௐWHDPௐZLOOௐ VXSSO\ௐDௐTXRWHௐIRUௐHDFKௐUHTXHVW

 ,GHQWLI\ௐDQ\ௐHOHPHQWௐRIௐWKHௐWRWDOௐFRVWௐRIௐDFTXLVLWLRQௐWKDWௐLV ௐ 127ௐLQFOXGHGௐLQௐWKHௐSULFLQJௐVXEPLWWHGௐZLWKௐ\RXUௐUHVSRQVHௐ 7KLVௐLQFOXGHVௐDOOௐDGGLWLRQDOௐFKDUJHVௐDVVRFLDWHGௐZLWKௐDௐ SXUFKDVHௐWKDWௐDUHௐQRWௐGLUHFWO\ௐLGHQWLILHGௐDVௐIUHLJKWௐRUௐ VKLSSLQJௐFKDUJHVௐ)RUௐH[DPSOHௐOLVWௐFRVWVௐIRUௐLWHPVௐOLNHௐSUH GHOLYHU\ௐLQVSHFWLRQௐLQVWDOODWLRQௐVHWௐXSௐPDQGDWRU\ௐWUDLQLQJௐ RUௐLQLWLDOௐLQVSHFWLRQௐ,GHQWLI\ௐDQ\ௐSDUWLHVௐWKDWௐLPSRVHௐVXFKௐ FRVWVௐDQGௐWKHLUௐUHODWLRQVKLSௐWRௐWKHௐ3URSRVHU
1RQHௐDOOௐFRVWௐRIௐDFTXLVLWLRQௐZLOOௐEHௐLQFOXGH

 ,IௐIUHLJKWௐGHOLYHU\ௐRUௐVKLSSLQJௐLVௐDQௐDGGLWLRQDOௐFRVWௐWRௐWK Hௐ 6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLW\ௐGHVFULEHௐLQௐGHWDLOௐWKHௐ FRPSOHWHௐIUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐSURJUDP
)UHLJKWௐRIௐ)RQURFKHௐ6RODUௐ/LJKWVௐDUHௐGRQHௐIURPௐ)RQURFKHௐIDFWRU\ௐDQGௐ UHDOL]HௐRQௐDௐIODWௐEHGௐWUXFNௐ
%HFDXVHௐRIௐWKLVௐWKHௐVKLSSLQJௐSULFHௐZLOOௐEHௐXSGDWHௐIRUௐHDFKௐSURSRVDOௐ 6KLSSLQJௐSULFHௐDUHௐEDVHGௐRQௐTXDQWLW\ௐ0LQLPXPௐVKLSSLQJௐSULFHௐ RQHௐ
XQLW
ௐIRUௐDௐGHOLYHU\ௐRQௐWKHௐPDLQODQGௐLVௐௐ86'

 6SHFLILFDOO\ௐGHVFULEHௐIUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐWHUPVௐR Uௐ SURJUDPVௐDYDLODEOHௐIRUௐ$ODVNDௐ+DZDLLௐ&DQDGDௐRUௐDQ\ௐ
RIIVKRUHௐGHOLYHU\
)UHLJKWௐRIௐ)RQURFKHௐ6RODUௐ/LJKWVௐDUHௐGRQHௐIURPௐ)RQURFKHௐIDFWRU\ௐDQGௐ UHDOL]HௐRQௐDௐIODWௐEHGௐWUXFNௐ
%HFDXVHௐRIௐWKLVௐWKHௐVKLSSLQJௐSULFHௐZLOOௐEHௐXSGDWHௐIRUௐHDFKௐSURSRVDOௐ 6KLSSLQJௐSULFHௐDUHௐEDVHGௐRQௐTXDQWLW\ௐ0LQLPXPௐVKLSSLQJௐTXDQWLW\ௐLVௐ RQHௐXQLWௐIRUௐ$ODVNDௐ+DZDLLௐ&DQDGDௐRUௐDQ\ௐRIIVKRUHௐGHOLYHU\ௐ )RQURFKHௐZLOOௐSURYLGHௐDௐVKLSSLQJௐSULFH
ௐ%URNDJHௐFRVWௐZLOOௐEHௐWKHௐ
FXVWRPHUௐUHVSRQVLELOLW\

 'HVFULEHௐDQ\ௐXQLTXHௐGLVWULEXWLRQௐDQGRUௐGHOLYHU\ௐPHWKRGVௐRUௐ RSWLRQVௐRIIHUHGௐLQௐ\RXUௐSURSRVDO
)RQURFKHௐLVௐDEOHௐWRௐGHOLYHUௐௐOLJKWVௐZLWKௐDQௐH[SHGLWHௐ/7ௐRIௐௐ ZHHNV 
 6SHFLILFDOO\ௐGHVFULEHௐDQ\ௐVHOIDXGLWௐSURFHVVௐRUௐSURJUDPௐWKDWௐ \RXௐSODQௐWRௐHPSOR\ௐWRௐYHULI\ௐFRPSOLDQFHௐZLWKௐ\RXUௐ
SURSRVHGௐDJUHHPHQWௐZLWKௐ6RXUFHZHOOௐ7KLVௐSURFHVVௐLQFOXGHVௐ HQVXULQJௐWKDWௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐREWDLQௐWKHௐ SURSHUௐSULFLQJ
6HOI$XGLWௐDQGௐ&RPSOLDQFHௐ9HULILFDWLRQௐ3URFHVV
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐLVௐFRPPLWWHGௐWRௐIXOOௐWUDQVSDUHQF\ௐDQGௐ FRPSOLDQFHௐZLWKௐWKHௐWHUPVௐRIௐDQ\ௐDZDUGHGௐDJUHHPHQWௐZLWKௐ 6RXUFHZHOOௐ7RௐHQVXUHௐ3DUWLFLSDWLQJௐ(QWLWLHVௐUHFHLYHௐSURSHUௐFRQWUDFWௐ SULFLQJௐDQGௐSURJUDPௐEHQHILWVௐZHௐZLOOௐLPSOHPHQWௐWKHௐIROORZLQJௐVHOI DXGLWௐSURFHVV

&HQWUDOL]HGௐ4XRWLQJௐ6\VWHP
$OOௐTXRWHVௐLVVXHGௐWRௐ6RXUFHZHOOௐ3DUWLFLSDWLQJௐ(QWLWLHVௐZLOOௐEHௐ JHQHUDWHGௐDQGௐWUDFNHGௐWKURXJKௐDௐFHQWUDOL]HGௐ&50ௐDQGௐTXRWLQJௐ SODWIRUPௐ7KLVௐHQVXUHVௐSULFLQJௐLVௐFRQVLVWHQWௐFXUUHQWௐDQGௐUHIOHFWVௐ FRQWUDFWௐWHUPV
6DOHVௐ7HDPௐ7UDLQLQJௐ$OOௐVDOHVௐUHSUHVHQWDWLYHVௐZLOOௐUHFHLYHௐUHJXODUௐ WUDLQLQJௐDQGௐUHIUHVKHUௐVHVVLRQVௐRQௐ6RXUFHZHOOௐSULFLQJௐVWUXFWXUHௐDQGௐ FRPSOLDQFHௐUHTXLUHPHQWVௐ6DOHVௐOHDGHUVKLSௐZLOOௐRYHUVHHௐDGKHUHQFHௐWRௐ WKHVHௐJXLGHOLQHV
'RFXPHQWDWLRQௐDQGௐ5HSRUWLQJ
$ௐUHFRUGௐRIௐDOOௐ6RXUFHZHOOௐWUDQVDFWLRQVௐZLOOௐEHௐPDLQWDLQHGௐDQGௐPDGHௐ DYDLODEOHௐIRUௐUHYLHZௐXSRQௐUHTXHVWௐ,IௐGLVFUHSDQFLHVௐDUHௐGLVFRYHUHGௐ ZHௐZLOOௐSURPSWO\ௐQRWLI\ௐ6RXUFHZHOOௐDQGௐWDNHௐFRUUHFWLYHௐDFWLRQ 

,Iௐ\RXௐDUHௐDZDUGHGௐDQௐDJUHHPHQWௐSURYLGHௐDௐIHZௐH[DPSOHVௐ RIௐLQWHUQDOௐPHWULFVௐWKDWௐZLOOௐEHௐWUDFNHGௐWRௐPHDVXUHௐZKHWKHUௐ \RXௐDUHௐKDYLQJௐVXFFHVVௐZLWKௐWKHௐDJUHHPHQW
H[WUDFWௐRIௐ&50ௐWRௐILQGௐKRZௐPDQ\ௐSURMHFWVௐFORVHௐZLWKௐFRQWUDFWௐ VRXUFHZHOOௐ7KLVௐZLOOௐEHௐGRQHௐRQFHௐDௐPRQWKௐE\ௐWKHௐPDQDJHUௐLQௐ FKDUJHௐRIௐSD\LQJௐWKHௐௐFRPPLVVLRQௐWRௐ6RXUFHZHOO

Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 116 of 1283 ends

 3URYLGHௐDௐSURSRVHGௐ$GPLQLVWUDWLRQௐ)HHௐSD\DEOHௐWRௐ
6RXUFHZHOOௐ7KHௐ)HHௐLVௐLQௐFRQVLGHUDWLRQௐIRUௐWKHௐVXSSRUWௐ DQGௐVHUYLFHVௐSURYLGHGௐE\ௐ6RXUFHZHOOௐ7KHௐSURSRVHௐDQௐ
$GPLQLVWUDWLYHௐ)HHௐZLOOௐEHௐSD\DEOHௐWRௐ6RXUFHZHOOௐRQௐDOOௐ FRPSOHWHGௐWUDQVDFWLRQVௐWRௐ3DUWLFLSDWLQJௐ(QWLWLHVௐXWLOL]LQJௐWKLVௐ $JUHHPHQWௐ7KHௐ$GPLQLVWUDWLYHௐ)HHௐZLOOௐEHௐFDOFXODWHGௐDVௐDௐ VWDWHGௐSHUFHQWDJHௐRUௐIODWௐIHHௐDVௐPD\ௐEHௐDSSOLFDEOHௐRIௐDOOௐ FRPSOHWHGௐWUDQVDFWLRQVௐXWLOL]LQJௐWKLVௐ0DVWHUௐ$JUHHPHQWௐ ZLWKLQௐWKHௐSUHFHGLQJௐ5HSRUWLQJௐ3HULRGௐGHILQHGௐLQௐWKHௐ
DJUHHPHQW
ௐZKLFKௐLVௐFRQVLVWHQWௐZLWKௐRWKHUௐSXUFKDVLQJௐFRRSHUDWLYHV 
7DEOH%
3ULFLQJ2IIHUHG
/LQH
,WHP 7KH3ULFLQJ2IIHUHGLQWKLV3URSRVDOLV

&RPPHQWV
 7KHSULFLQJRIIHUHGLVDVJRRGDVRUEHWWHUWKDQSULFLQJW\SL FDOO\RIIHUHGWKURXJKH[LVWLQJFRRSHUDWLYHFRQWUDFWVVWDWH FRQWUDFWVRUDJHQFLHV
7KHௐSULFLQJௐRIIHUHGௐLVௐDVௐ
JRRGௐDVௐRUௐEHWWHUௐWKDQௐ
SULFLQJௐW\SLFDOO\ௐRIIHUHGௐ
WKURXJKௐH[LVWLQJௐFRRSHUDWLYHௐ
FRQWUDFWVௐVWDWHௐFRQWUDFWVௐRUௐ
DJHQFLHVௐ)RQURFKHௐZLOOௐ
DOZD\VௐPDNHௐVXUHௐWRௐSURSRVH
ௐ
WKHௐVDPHௐSULFHௐRUௐORZHUௐ
SULFHௐWRௐWKHௐ6RXUFHZHOOௐ

PHPEHUV

7DEOH$
'HSWKDQG%UHDGWKRI2IIHUHG6ROXWLRQV
3RLQWVDSSOLHVWR7DEOHV$WKURXJK(

/LQH
,WHP 4XHVWLRQ 5HVSRQVH 
 3URYLGHௐDௐGHWDLOHGௐGHVFULSWLRQௐRIௐDOOௐWKHௐ
VROXWLRQVௐRIIHUHGௐLQFOXGLQJௐXVHGௐVROXWLRQVௐLIௐ
DSSOLFDEOHௐRIIHUHGௐLQௐWKHௐSURSRVDO
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐRIIHUVௐFRPSUHKHQVLYHௐVRODUௐVWUHHWOLJKWLQJௐVROXWLRQVௐ GHVLJQHGௐWRௐPHHWௐWKHௐQHHGVௐRIௐPXQLFLSDOLWLHVௐFRXQWLHVௐ'27VௐDQGௐRWKHUௐSXEOLFௐ DJHQFLHVௐ2XUௐSURSRVDOௐLQFOXGHVௐWKHௐIROORZLQJ
ௐ
ௐௐௐௐ6RODUௐ6WUHHWOLJKWLQJௐ6\VWHPV
2XUௐV\VWHPVௐDUHௐQRWௐDOOLQRQHௐXQLWVௐ,QVWHDGௐWKH\ௐDUHௐPRGXODUௐZLWKௐHDFKௐFRPSRQHQWௐ GHVLJQHGௐDQGௐPRXQWHGௐVHSDUDWHO\ௐIRUௐPD[LPXPௐSHUIRUPDQFHௐDQGௐGXUDELOLW\ௐ(DFKௐ V\VWHPௐLQFOXGHV

‡ௐௐௐௐ6RODUௐ3DQHOௐ$VVHPEO\
ௐ0RXQWHGௐDWௐWKHௐWRSௐRIௐWKHௐSROHௐIRUௐRSWLPDOௐVXQௐH[SRVXUHௐ +LJKHIILFLHQF\ௐPRQRFU\VWDOOLQHௐSDQHOVௐDUHௐVL]HGௐWRௐPHHWௐVLWHVSHFLILFௐHQHUJ\ௐQHHGV ‡ௐௐௐௐ(QHUJ\ௐ6WRUDJH
ௐ1LFNHOௐRUௐ/LWKLXP
‡ௐௐௐௐ6PDUWௐ&RQWUROOHU
ௐ,QVWDOOHGௐLQௐWKHௐSROHௐRUௐFDELQHWௐRXUௐSURSULHWDU\ௐFRQWUROOHUௐ PDQDJHVௐFKDUJLQJௐOLJKWLQJௐSURILOHVௐDQGௐV\VWHPௐKHDOWK ‡ௐௐௐௐ/('ௐ)L[WXUHௐ
/XPLQDLUH

ௐ+LJKHIILFLHQF\ௐGDUNVN\ௐFRPSOLDQWௐ/('VௐDYDLODEOHௐLQௐ PXOWLSOHௐZDWWDJHVௐDQGௐOLJKWௐGLVWULEXWLRQVௐ)L[WXUHVௐDUHௐFKRVHQௐEDVHGௐRQௐDSSOLFDWLRQௐ

URDGZD\ௐSDWKZD\ௐDUHDௐOLJKWLQJ

‡ௐௐௐௐ3ROHௐ ௐ0RXQWLQJௐ2SWLRQV
ௐ,QFOXGHVௐVWDQGDUGௐDQGௐGHFRUDWLYHௐSROHVௐZLWKௐYDULRXVௐ
IRXQGDWLRQௐRSWLRQVௐ
HPEHGGHGௐRUௐDQFKRUௐEDVH

$OOௐV\VWHPVௐDUHௐZDUUDQW\ௐௐ\HDUVௐௐDQGௐZLOOௐZRUNௐIRUௐௐ\HDUVௐZLWKௐQRௐ PDLQWHQDQFH
ௐௐ'HFRUDWLYHௐDQGௐ&XVWRPௐ/LJKWLQJௐ6ROXWLRQV
7RௐPHHWௐDUFKLWHFWXUDOௐRUௐFRPPXQLW\ௐDHVWKHWLFVௐZHௐRIIHU

‡ௐௐௐௐ2UQDPHQWDOௐSROHVௐ
%HOOHௐ(SRTXHௐ2SHUDௐ1HZௐ$UWௐ%ROODUGௐ&U\VWDOௐEXOEV

‡ௐௐௐௐ'HFRUDWLYHௐDUPVௐDQGௐIL[WXUHௐVW\OHV
‡ௐௐௐௐ&RORUPDWFKHGௐFRPSRQHQWVௐIRUௐVHDPOHVVௐLQWHJUDWLRQௐLQௐSDUNVௐFDPSXVHVௐRUௐ KLVWRULFௐGLVWULFWV
ௐ(QJLQHHULQJௐDQGௐ3URMHFWௐ'HVLJQௐ6XSSRUW
2XUௐWHFKQLFDOௐWHDPௐSURYLGHV

‡ௐௐௐௐ6LWHVSHFLILFௐV\VWHPௐVL]LQJௐXVLQJௐLQWHUQDOௐFDOFXODWLRQௐVKHHWௐDQGௐEDWWHU\ௐV\VWHPௐ

PDQDJHPHQW
‡ௐௐௐௐ3KRWRPHWULFௐVWXGLHV
‡ௐௐௐௐ/D\RXWௐSODQVௐDQGௐLQVWDOODWLRQௐGUDZLQJV
‡ௐௐௐௐ6XEPLWWDOVௐDQGௐWHFKQLFDOௐGRFXPHQWDWLRQ
ௐௐ,QVWDOODWLRQௐ6HUYLFHVௐ
2SWLRQDO

:KLOHௐPDQ\ௐFOLHQWVௐLQVWDOOௐWKHௐV\VWHPVௐZLWKௐWKHLUௐRZQௐFUHZVௐZHௐDOVRௐRIIHU

‡ௐௐௐௐ7XUQNH\ௐLQVWDOODWLRQௐVHUYLFHVௐYLDௐORFDOௐRUௐQDWLRQDOௐLQVWDOOHUV ‡ௐௐௐௐ2QVLWHௐFRPPLVVLRQLQJ
‡ௐௐௐௐ7UDLQLQJௐIRUௐFXVWRPHUௐVWDIIௐDQGௐRQJRLQJௐVXSSRUW
ௐ$IWHU6DOHVௐ6XSSRUWௐ ௐ:DUUDQW\
‡ௐௐௐௐ<HDUௐ)XOO6\VWHPௐ:DUUDQW\ௐ
‡ௐௐௐௐ)UHHௐ5HPRWHௐ0RQLWRULQJௐ
RQௐWKHௐVWUHHWOLJKWV

‡ௐௐௐௐ7HFKQLFDOௐ6XSSRUWௐYLDௐSKRQHௐHPDLOௐDQGௐILHOGௐYLVLWV 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 117 of 1283 ends

 :LWKLQௐWKLVௐ5)3ௐFDWHJRU\ௐWKHUHௐPD\ௐEHௐ
VXEFDWHJRULHVௐRIௐVROXWLRQVௐ/LVWௐVXEFDWHJRU\ௐ
WLWOHVௐWKDWௐEHVWௐGHVFULEHௐ\RXUௐSURGXFWVௐDQGௐ
VHUYLFHV
1$

 'HVFULEHௐKRZௐ\RXUௐVROXWLRQVௐHQVXUHௐGDWDௐ
SULYDF\ௐVHFXULW\ௐDQGௐFRPSOLDQFH
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐGHVLJQVௐLWVௐVRODUௐOLJKWLQJௐV\VWHPVௐZLWKௐSULYDF\ௐDQGௐGDWDௐ VHFXULW\ௐDWௐWKHௐFRUHௐ2XUௐV\VWHPVௐDUHௐEXLOWௐIRUௐSHUIRUPDQFHௐDQGௐUHOLDELOLW\²QRWௐIRUௐ GDWDௐKDUYHVWLQJ²DQGௐZHௐIROORZௐVWULFWௐSURWRFROVௐWRௐHQVXUHௐDOOௐFROOHFWHGௐGDWDௐLVௐKDQGOHGௐ UHVSRQVLEO\
1Rௐ&ROOHFWLRQௐRIௐ3HUVRQDOௐ'DWD
2XUௐV\VWHPVௐGRௐQRWௐFROOHFWௐRUௐSURFHVVௐDQ\ௐSHUVRQDOௐRUௐXVHULGHQWLILDEOHௐLQIRUPDWLRQௐ 7KHௐRQO\ௐGDWDௐJDWKHUHGௐLVௐRSHUDWLRQDOௐLQFOXGLQJ

%DWWHU\ௐVWDWXV
6RODUௐFKDUJLQJௐSHUIRUPDQFH
/LJKWLQJௐVFKHGXOHV
6\VWHPௐKHDOWKௐDQGௐIDXOWௐGHWHFWLRQ
7KLVௐLQIRUPDWLRQௐLVௐXVHGௐH[FOXVLYHO\ௐIRUௐV\VWHPௐSHUIRUPDQFHௐPRQLWRULQJௐDQGௐ PDLQWHQDQFH
&RPSOLDQFHௐDQGௐ%HVWௐ3UDFWLFHV
:KLOHௐSHUVRQDOௐGDWDௐLVௐQRWௐFROOHFWHGௐ)RQURFKHௐDOLJQVௐZLWKௐLQGXVWU\ௐEHVWௐSUDFWLFHVௐIRUௐ GDWDௐSURWHFWLRQ

0LQLPDOௐDQGௐSXUSRVHGULYHQௐGDWDௐFROOHFWLRQ
6HFXUHௐVWRUDJHௐDQGௐWUDQVPLVVLRQௐRIௐRSHUDWLRQDOௐGDWD
7UDQVSDUHQF\ௐZLWKௐFXVWRPHUVௐUHJDUGLQJௐWKHௐW\SHௐDQGௐXVHௐRIௐV\VWHPௐGDWD 
 'HVFULEHௐKRZௐ\RXUௐVROXWLRQVௐHQVXUHௐ
LQWHURSHUDELOLW\ௐZLWKௐH[LVWLQJௐV\VWHPVௐDQGௐ
IXWXUHௐXSJUDGHV
(DV\ௐUHWURILWௐNLWௐPDGHௐVSHFLILFDOO\ௐIRUௐDQௐLQWHJUDWLRQௐZLWKௐH[LVWLQJௐSROHVௐDQGௐPRXQWLQJௐ VWUXFWXUHVௐ
ZKHUHௐDSSOLFDEOH

6WDQGDUGV%DVHGௐ&RPSRQHQWV
ௐ&RPSDWLELOLW\ௐZLWKௐFRPPRQௐSROHௐW\SHVௐDQGௐPRXQWLQJௐ
KDUGZDUHௐ
ௐௐ6PRRWKௐDQGௐHDV\ௐLQWHJUDWLRQௐLQWRௐSXEOLFௐLQIUDVWUXFWXUHௐSURMHFWV 5HPRWHௐ0RQLWRULQJௐ&RPSDWLELOLW\ௐ


7DEOH%
2XWGRRU6HQVRUVRU$GYDQFHG6HQVRU,QWHJUDWHG/XPLQDLUHV 8VLQJWKHFRPPHQWVWH[WER[DQVZHUWKHTXHVWLRQVEHORZLI\RXUSURSRVDOLVRIIHULQJ2XWGRRU6HQVRUVRU$GYDQFHG6HQVRU ,QWHJUDWHG/XPLQDLUHV 
:HZLOOQRWEHVXEPLWWLQJIRU7DEOH%
2XWGRRU6HQVRUVRU$GYDQFHG6HQVRU,QWHJUDWHG/XPLQDLUHV /LQH
,WHP &DWHJRU\RU7\SH &RPPHQWV 
 'HVFULEHௐZKDWௐFRPPXQLFDWLRQௐSURWRFROVௐ

HJௐ$3,ௐ'$/,
ௐDUHௐVXSSRUWHGௐE\ௐ\RXUௐ

VROXWLRQ
V
ௐWRௐHQVXUHௐFRPSDWLELOLW\ௐZLWKௐ
GLIIHUHQWௐV\VWHPV


 'HVFULEHௐZKDWௐWUDQVPLVVLRQௐPHWKRGVௐ
HJௐ
ZLUHGௐZLUHOHVV
ௐWKHௐVHQVRUVௐXVHௐDQGௐKRZௐ
WKH\ௐHQVXUHௐUHOLDEOHௐFRPPXQLFDWLRQ


 ,IௐDSSOLFDEOHௐGHVFULEHௐKRZௐ\RXUௐSURSRVHGௐ

VROXWLRQ
V
ௐHQVXUHௐ=KDJDௐFRPSOLDQFHௐIRUௐWKHௐ
LQWHJUDWLRQௐRIௐ/('ௐPRGXOHVௐVHQVRUVௐRUௐ
FRPPXQLFDWLRQௐGHYLFHVௐWRௐIDFLOLWDWHௐHDV\ௐ
XSJUDGHVௐDQGௐLQWHURSHUDELOLW\


Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 118 of 1283 ends

7DEOH&
3K\VLFDO$VVHWV3ROHVDQG0RXQWLQJ6WUXFWXUHV
8VLQJWKHFRPPHQWVWH[WER[DQVZHUWKHTXHVWLRQVEHORZLI\RXUSURSRVDOLVRIIHULQJ3K\VLFDO$VVHWV3ROHVDQG0RXQWLQJ 6WUXFWXUHV
:HZLOOQRWEHVXEPLWWLQJIRU7DEOH&
3K\VLFDO$VVHWV3ROHVDQG0RXQWLQJ6WUXFWXUHV
/LQH
,WHP &DWHJRU\RU7\SH &RPPHQWV 

'HVFULEHௐKRZௐ\RXUௐVROXWLRQ
V
ௐHQVXUHௐWKHௐ
GXUDELOLW\ௐDQGௐDGDSWDELOLW\ௐRIௐPRXQWLQJௐ
VWUXFWXUHVௐLQௐYDU\LQJௐHQYLURQPHQWDOௐFRQGLWLRQV
ௐ(QJLQHHUHGௐIRUௐ+DUVKௐ(QYLURQPHQWV
2XUௐPRXQWLQJௐVWUXFWXUHVௐDUHௐGHVLJQHGௐWRௐZLWKVWDQGௐWKHௐPRVWௐGHPDQGLQJௐFRQGLWLRQV

‡ௐௐௐௐ:LQGௐ/RDGௐ&RPSOLDQFH
ௐ3ROHVௐDQGௐPRXQWLQJௐDVVHPEOLHVௐDUHௐHQJLQHHUHGௐWRௐPHHWௐ
RUௐH[FHHGௐORFDOௐZLQGௐORDGௐUHTXLUHPHQWVௐRIWHQௐXSௐWRௐௐPSKௐDVௐSHUௐ86ௐJXLGHOLQHV ‡ௐௐௐௐ&RUURVLRQௐ5HVLVWDQFH
ௐ$OOௐVWHHOௐFRPSRQHQWVௐDUHௐKRWGLSௐJDOYDQL]HGௐRUௐSRZGHU FRDWHGௐWRௐUHVLVWௐFRUURVLRQௐPDNLQJௐWKHPௐVXLWDEOHௐIRUௐFRDVWDOௐKXPLGௐRUௐVQRZSURQHௐ HQYLURQPHQWV
‡ௐௐௐௐ7HPSHUDWXUHௐ7ROHUDQFH
ௐ6\VWHPௐFRPSRQHQWVௐRSHUDWHௐUHOLDEO\ௐLQௐDௐZLGHௐWHPSHUDWXUHௐ UDQJHௐ)ௐWRௐ)ௐZLWKௐEDWWHULHVௐDQGௐHQFORVXUHVௐUDWHGௐIRUௐERWKௐKRWௐDQGௐFROGௐFOLPDWHV ௐ0RGXODUௐDQGௐ$GDSWDEOHௐ3ROHௐ'HVLJQ
)RQURFKHௐRIIHUVௐDௐUDQJHௐRIௐSROHௐW\SHVௐWRௐDGDSWௐWRௐORFDOௐLQVWDOODWLRQௐUHTXLUHPHQWV

‡ௐௐௐௐ(PEHGGHGௐRUௐDQFKRUEDVHௐRSWLRQVௐRUௐUHWURILWௐNLWௐZLWKௐDௐFXVWRPௐEDVH ‡ௐௐௐௐ+HLJKWVௐDQGௐILQLVKHVௐVXLWDEOHௐIRUௐXUEDQௐUXUDOௐRUௐGHFRUDWLYHௐDSSOLFDWLRQV ௐ$GMXVWDEOHௐ6RODUௐ3DQHOௐ0RXQWV
6RODUௐSDQHOௐEUDFNHWVௐDUH

‡ௐௐௐௐ7LOWDGMXVWDEOHௐWRௐRSWLPL]HௐVRODUௐH[SRVXUHௐEDVHGௐRQௐJHRJUDSKLFௐORFDWLRQ ‡ௐௐௐௐ$UPௐDGMXVWDEOHௐWRௐRSWLPL]HௐWKHௐXQLIRUPLW\ௐRIௐWKHௐOLJKWௐRQௐWKHௐJURXQGௐZKHQௐQHFHVVDU\ ௐ3URYHQௐ7UDFNௐ5HFRUG
)RQURFKHௐV\VWHPVௐDUHௐLQVWDOOHGௐLQௐRYHUௐௐVWDWHVௐLQௐWKHௐ86DFURVVௐGHVHUWVௐFRDVWOLQHVௐ LVODQGVௐDQGௐIUHH]LQJௐ]RQHV²HDFKௐLQVWDOODWLRQௐOHYHUDJLQJௐVLWHVSHFLILFௐPRXQWLQJௐDQGௐ V\VWHPௐDGMXVWPHQWVௐIRUௐORQJWHUPௐUHVLOLHQFH
2XUௐVRODUௐOLJKWLQJௐVROXWLRQVௐDUHௐQRWௐRQO\ௐEXLOWௐWRௐODVW²WKH\¶UHௐEXLOWௐWRௐDGDSWௐ5HJDUGOHVVௐ RIௐWHUUDLQௐFOLPDWHௐRUௐXUEDQௐVHWWLQJௐ)RQURFKHௐGHOLYHUVௐLQIUDVWUXFWXUHௐWKDW¶VௐILHOGSURYHQௐ VHFXUHௐDQGௐEXLOWௐIRUௐGHFDGHVௐRIௐUHOLDEOHௐRSHUDWLRQ

7DEOH'
1HWZRUN&RPSRQHQWV*DWHZD\V&RQWUROOHUV&RPPXQLFDWLRQ0RGXOHVRU6SHFLDOL]HG3ODWIRUPV 8VLQJWKHFRPPHQWVWH[WER[DQVZHUWKHTXHVWLRQVEHORZLI\RXUSURSRVDOLVRIIHULQJ1HWZRUN&RPSRQHQWV*DWHZD\V&RQWUROOHUV &RPPXQLFDWLRQ0RGXOHVRU6SHFLDOL]HG3ODWIRUPV
:HZLOOQRWEHVXEPLWWLQJIRU7DEOH'
1HWZRUN&RPSRQHQWV*DWHZD\V&RQWUROOHUV&RPPXQLFDWLRQ0RGXOHVRU6SHFLDOL]HG 3ODWIRUPV
/LQH
,WHP &DWHJRU\RU7\SH &RPPHQWV 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 119 of 1283 ends

 'HVFULEHௐZKDWௐUHGXQGDQF\ௐIHDWXUHVௐDUHௐEXLOWௐ
LQWRௐ\RXUௐQHWZRUNௐFRPSRQHQWVௐWRௐHQVXUHௐ
FRQWLQXRXVௐRSHUDWLRQ
5HGXQGDQF\ௐ)HDWXUHVௐIRUௐ&RQWLQXRXVௐ2SHUDWLRQ
)RQURFKHௐ/LJKWLQJௐ$PHULFD¶VௐVRODUௐOLJKWLQJௐV\VWHPVௐDUHௐGHVLJQHGௐZLWKௐEXLOWLQௐUHVLOLHQFHௐ DQGௐDXWRQRPRXVௐRSHUDWLRQௐHOLPLQDWLQJௐGHSHQGHQF\ௐRQௐH[WHUQDOௐSRZHUௐRUௐFHQWUDOL]HGௐ QHWZRUNVௐ:KLOHௐRXUௐV\VWHPVௐDUHௐW\SLFDOO\ௐVWDQGDORQHௐWKH\ௐLQFOXGHௐVHYHUDOௐNH\ௐIHDWXUHVௐ WKDWௐDFWௐLQWHUQDOௐUHGXQGDQF\ௐPHDVXUHVௐWRௐHQVXUHௐFRQWLQXRXVௐXQLQWHUUXSWHGௐRSHUDWLRQ ௐ,QGHSHQGHQWௐ2SHUDWLRQௐRIௐ(DFKௐ8QLW
(DFKௐVRODUௐOLJKWௐIXQFWLRQVௐDVௐDௐIXOO\ௐLQGHSHQGHQWௐXQLWௐZLWKௐLWVௐRZQௐVRODUௐSDQHOௐEDWWHU\ௐ FRQWUROOHUௐDQGௐOLJKWௐIL[WXUHௐ7KLVௐGHVLJQௐPHDQV

‡ௐௐௐௐ1RௐVLQJOHௐSRLQWௐRIௐIDLOXUH²H[DPSOHௐLIௐRQHௐOLJKWௐJRHVௐRIIOLQHௐGXHௐWRௐDௐFUDVKௐ RWKHUVௐUHPDLQௐIXOO\ௐRSHUDWLRQDOௐWRௐDVVXUHௐVDIHW\ௐLQௐWKHௐVWUHHW ‡ௐௐௐௐ1RௐQHHGௐIRUௐFHQWUDOL]HGௐQHWZRUNௐFRQWUROௐRUௐJULGௐSRZHUௐWRௐIXQFWLRQ ௐ%DWWHU\ௐ6L]HௐXSௐIRUௐWKHௐORFDWLRQௐௐ ௐ)RQURFKHௐ%DWWHU\ௐPDQDJHPHQWௐV\VWHP 2XUௐV\VWHPVௐDUHௐHQJLQHHUHGௐZLWKௐEXLOWLQௐHQHUJ\ௐDXWRQRP\ௐSURYLGLQJௐௐQLJKWVௐRIௐOLJKWௐ IRUௐௐ\HDUV

‡ௐௐௐௐ(QVXUHVௐRSHUDWLRQௐWKURXJKௐPXOWLSOHௐGD\VௐRIௐORZௐVRODUௐLQSXWௐ HJௐVWRUPVௐVQRZௐRUௐ
VPRNH

‡ௐௐௐௐ3UHYHQWVௐRXWDJHVௐFDXVHGௐE\ௐWHPSRUDU\ௐHQYLURQPHQWDOௐFRQGLWLRQVௐZLWKௐDௐ)RQURFKHௐ %DWWHU\ௐPDQDJHPHQWௐV\VWHPௐGHYHORSHGௐVSHFLILFDOO\ௐWRௐDVVXUHௐUHOLDELOLW\ௐLQௐWKHௐZRUVW FDVHௐVFHQDULR
ௐ3DVVLYHௐ7KHUPDOௐ0DQDJHPHQW
%DWWHU\ௐHQFORVXUHVௐDUHௐJURXQGPRXQWHGௐDQGௐYHQWLODWHGௐWR

‡ௐௐௐௐ3UHYHQWௐRYHUKHDWLQJௐLQௐKRWௐFOLPDWHV
‡ௐௐௐௐ,PSURYHௐEDWWHU\ௐORQJHYLW\ௐDQGௐDYRLGௐWKHUPDOUHODWHGௐV\VWHPௐIDLOXUHV ௐ2SWLRQDOௐ5HPRWHௐ0RQLWRULQJ
)RUௐFXVWRPHUVௐZKRௐRSWௐIRUௐFRQQHFWHGௐV\VWHPVௐRXUௐPRQLWRULQJௐSODWIRUPௐDOORZV

‡ௐௐௐௐ5HDOWLPHௐKHDOWKௐFKHFNV
‡ௐௐௐௐ(DUO\ௐGHWHFWLRQௐRIௐIDXOWVௐRUௐSHUIRUPDQFHௐGURSV
‡ௐௐௐௐ3URDFWLYHௐPDLQWHQDQFHௐEHIRUHௐV\VWHPௐIDLOXUH

 'HVFULEHௐZKDWௐIHDWXUHVௐ\RXUௐSODWIRUPௐSURYLGHVௐ
IRUௐPRQLWRULQJௐFRQWUROOLQJௐDQGௐPDQDJLQJௐ
VPDUWௐLQIUDVWUXFWXUHௐDVVHWV
)2152&+(ௐ&211(&7
)HDWXUHVௐIRUௐ0RQLWRULQJௐ&RQWUROOLQJௐDQGௐ0DQDJLQJௐ6PDUWௐ,QIUDVWUXFWXUHௐ$VVHWV )RQURFKHௐ/LJKWLQJௐ$PHULFDௐSURYLGHVௐDௐVPDUWௐRSWLRQDOௐPRQLWRULQJௐSODWIRUPௐGHVLJQHGௐWRௐ KHOSௐDVVHWௐRZQHUVௐDQGௐIDFLOLW\ௐPDQDJHUVௐWUDFNௐV\VWHPௐSHUIRUPDQFHௐGLDJQRVHௐLVVXHVௐ UHPRWHO\ௐDQGௐRSWLPL]HௐOLJKWLQJௐRSHUDWLRQVௐ:KLOHௐQRWௐDOOௐSURMHFWVௐUHTXLUHௐFRQQHFWHGௐ V\VWHPVௐZHௐRIIHUௐ)RQURFKHௐFRQQHFWௐIHDWXUHVௐIRUௐWKRVHௐZKRௐGR ௐ5HDO7LPHௐ6\VWHPௐ0RQLWRULQJ
2XUௐSODWIRUPௐHQDEOHVௐXVHUVௐWRௐYLHZ

‡ௐௐௐௐ%DWWHU\ௐVWDWHௐRIௐFKDUJH
‡ௐௐௐௐ6RODUௐSDQHOௐHQHUJ\ௐSURGXFWLRQ
‡ௐௐௐௐ/RDGௐ

OLJKWLQJ
ௐVWDWXV
‡ௐௐௐௐ&RQWUROௐSHUIRUPDQFHௐPHWULFV
‡ௐௐௐௐ$OHUWVௐIRUௐIDXOWVௐRUௐDQRPDOLHVௐ
HJௐDEQRUPDOௐGLVFKDUJHௐSDQHOௐREVWUXFWLRQௐEDWWHU\ௐ
DJLQJ

ௐ5HPRWHௐ/LJKWLQJௐ&RQWURO
$XWKRUL]HGௐXVHUVௐFDQௐUHPRWHO\

‡ௐௐௐௐ0RGLI\ௐOLJKWLQJௐSURILOHVௐ
RQRIIௐWLPHVௐGLPPLQJௐVFKHGXOHV

‡ௐௐௐௐ$GMXVWௐEULJKWQHVVௐOHYHOVௐEDVHGௐRQௐWLPHௐRIௐGD\ௐRUௐVHDVRQ ‡ௐௐௐௐ$FWLYDWHௐRUௐGHDFWLYDWHௐVSHFLILFௐXQLWVௐIRUௐHYHQWV
ௐ6\VWHPௐ0DQDJHPHQWௐ'DVKERDUG
7KHௐZHEEDVHGௐGDVKERDUGௐSURYLGHV

‡ௐௐௐௐ0DSEDVHGௐYLVXDOL]DWLRQௐRIௐDOOௐLQVWDOOHGௐV\VWHPV
‡ௐௐௐௐ(DV\WRUHDGௐSHUIRUPDQFHௐJUDSKV
‡ௐௐௐௐ&XVWRPௐUHSRUWLQJௐIHDWXUHVௐIRUௐFRPSOLDQFHௐRUௐLQWHUQDOௐWUDFNLQJ ௐ3UHGLFWLYHௐ0DLQWHQDQFHௐ7RROV
8VLQJௐSHUIRUPDQFHௐWUHQGVௐWKHௐV\VWHPௐFDQ

‡ௐௐௐௐ1RWLI\ௐWHDPVௐRIௐSRWHQWLDOௐIDLOXUHVௐEHIRUHௐRXWDJHVௐRFFXU ‡ௐௐௐௐ6XJJHVWௐEDWWHU\ௐUHSODFHPHQWVௐRUௐV\VWHPௐFKHFNV
ௐ8VHUௐ$FFHVVௐ0DQDJHPHQW
‡ௐௐௐௐ0XOWLSOHௐOHYHOVௐRIௐDFFHVVௐ
DGPLQௐVHUYLFHௐWHFKQLFLDQௐYLHZHU

‡ௐௐௐௐ6HFXUHௐORJLQௐZLWKௐUROHEDVHGௐFRQWUROV
‡ௐௐௐௐ$XGLWௐWUDLOVௐIRUௐV\VWHPௐFKDQJHVௐDQGௐXVHUௐDFWLRQV

 ,IௐDSSOLFDEOHௐGHVFULEHௐKRZௐ\RXUௐSODWIRUPௐ
VXSSRUWVௐPXOWLSOHௐGDWDௐVRXUFHVௐDQGௐLQWHJUDWHVௐ
WKHPௐLQWRௐDௐXQLILHGௐGDVKERDUGௐIRUௐUHDOWLPHௐ
PRQLWRULQJ
1$

Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 120 of 1283 ends

7DEOH(
,QWHJUDWLRQZLWK7XUQNH\6HUYLFHV
8VLQJWKHFRPPHQWVWH[WER[DQVZHUWKHTXHVWLRQVEHORZLI\RXUSURSRVDOLVRIIHULQJ,QWHJUDWLRQZLWK7XUQNH\6HUYLFHV :HZLOOQRWEHVXEPLWWLQJIRU7DEOH(
,QWHJUDWLRQZLWK7XUQNH\6HUYLFHV
/LQH
,WHP &DWHJRU\RU7\SH &RPPHQWV 
 'HVFULEHௐZKDWௐOHYHOVௐRIௐVHUYLFHௐ
HJௐ
WHFKQRORJ\LQIUDVWUXFWXUHௐRQO\ௐWXUQNH\ௐRWKHU
ௐ
DUHௐEHLQJௐSURSRVHG
)RQURFKHௐ/LJKWLQJௐ$PHULFDௐSURYLGHVௐDௐUDQJHௐRIௐIOH[LEOHௐVHUYLFHௐOHYHOVௐWRௐPHHWௐWKHௐ GLYHUVHௐQHHGVௐRIௐSXEOLFௐDJHQFLHVௐPXQLFLSDOLWLHVௐDQGௐSULYDWHௐSDUWQHUVௐ:HௐVXSSRUWௐ SURMHFWVௐIURPௐEDVLFௐSURGXFWௐVXSSO\ௐWRௐIXOOௐWXUQNH\ௐVROXWLRQV 
 'HVFULEHௐ\RXUௐSURSRVHGௐPDLQWHQDQFHௐSODQVௐ
DQGௐVFKHGXOHVௐ
3URYLGHௐGHWDLOVௐRQௐURXWLQHௐPDLQWHQDQFHௐ
HPHUJHQF\ௐUHSDLUVௐVRIWZDUHௐXSGDWHVௐDQGௐ
DQ\ௐUHPRWHௐPRQLWRULQJௐFDSDELOLWLHV
,QFOXGHௐSULFLQJௐIRUௐVXFKௐPDLQWHQDQFHௐLQௐ\RXUௐ
SURSRVDO
1RௐPDLQWHQDQFHௐUHTXLUHௐIRUௐௐ\HDUVௐDQ\ௐPDLQWHQDQFHௐGXHௐWRௐV\VWHPௐZLOOௐEHௐKDQGOHௐ E\ௐ)RQURFKH
ௐ7HFKQRORJ\,QIUDVWUXFWXUHௐ2QO\
:HௐVXSSO\ௐKLJKSHUIRUPDQFHௐRIIJULGௐVRODUௐOLJKWLQJௐV\VWHPVௐLQFOXGLQJ

‡ௐௐௐௐ6RODUௐSDQHOVௐEDWWHULHVௐFRQWUROOHUVௐSROHVௐDQGௐIL[WXUHV ‡ௐௐௐௐ(QJLQHHULQJௐGRFXPHQWDWLRQௐDQGௐLQVWDOODWLRQௐJXLGHOLQHV ‡ௐௐௐௐ3KRWRPHWULFௐVWXGLHVௐDQGௐOD\RXWௐUHFRPPHQGDWLRQV
7KLVௐOHYHOௐLVௐLGHDOௐIRUௐFXVWRPHUVௐZKRௐSUHIHUௐWRௐKDQGOHௐLQVWDOODWLRQௐWKURXJKௐWKHLUௐRZQௐ FRQWUDFWRUV
ௐ$VVLVWHGௐ,QVWDOODWLRQௐௐ3DUWLDOௐ7XUQNH\
,QௐWKLVௐPRGHOௐ)RQURFKHௐSURYLGHV

‡ௐௐௐௐ6LWHVSHFLILFௐV\VWHPௐFRQILJXUDWLRQ
‡ௐௐௐௐ2QVLWHௐVXSHUYLVLRQௐRUௐLQVWDOODWLRQௐWUDLQLQJ
‡ௐௐௐௐ&RRUGLQDWLRQௐZLWKௐWKHௐFXVWRPHU¶VௐFKRVHQௐLQVWDOOHU
‡ௐௐௐௐ2SWLRQDOௐV\VWHPௐFRPPLVVLRQLQJௐDQGௐILQDOௐLQVSHFWLRQ 7KLVௐOHYHOௐEDODQFHVௐIOH[LELOLW\ௐZLWKௐVXSSRUWௐHVSHFLDOO\ௐIRUௐILUVWWLPHௐVRODUௐOLJKWLQJௐFXVWRPHUV ௐ)XOOௐ7XUQNH\ௐ6HUYLFHௐ
ZKHUHௐDYDLODEOH

)RQURFKHௐRUௐLWVௐDXWKRUL]HGௐSDUWQHUVௐPDQDJHௐWKHௐHQWLUHௐSURMHFWௐLQFOXGLQJ

‡ௐௐௐௐ6LWHௐDVVHVVPHQWௐDQGௐHQJLQHHULQJ
‡ௐௐௐௐ3HUPLWWLQJௐVXSSRUWௐ
LIௐUHTXLUHG

‡ௐௐௐௐ'HOLYHU\ௐLQVWDOODWLRQௐDQGௐFRPPLVVLRQLQJ
‡ௐௐௐௐ3RVWLQVWDOODWLRQௐPRQLWRULQJௐVHWXSௐDQGௐVXSSRUW
‡ௐௐௐௐ2QJRLQJௐZDUUDQW\ௐDQGௐPDLQWHQDQFHௐVHUYLFHV
ௐ2QJRLQJௐ6XSSRUWௐ ௐ0RQLWRULQJௐ
2SWLRQDO

$OOௐVHUYLFHௐOHYHOVௐFDQௐEHௐSDLUHGௐZLWK

‡ௐௐௐௐ5HPRWHௐSHUIRUPDQFHௐPRQLWRULQJ
‡ௐௐௐௐ7HFKQLFDOௐVXSSRUWௐDQGௐWUDLQLQJ

 %ULHIO\ௐGHVFULEHௐRQHௐ

ௐSURMHFWௐ\RXௐKDYHௐ
FRPSOHWHGௐIRUௐDQRWKHUௐSXEOLFௐDJHQF\ௐDQGௐ
287/,1(ௐWKHௐGHSOR\PHQWௐSURFHVV
6LWHௐ$VVHVVPHQWௐ ௐ(QJLQHHULQJௐ'HVLJQ
)RQURFKHௐFRQGXFWHGௐDௐSKRWRPHWULFௐVWXG\ௐDQGௐVLWHௐDQDO\VLV 6\VWHPௐVL]LQJௐZDVௐFXVWRPL]HGௐIRUௐHDFKௐORFDWLRQௐEDVHGௐRQௐOLJKWLQJௐQHHGVௐVRODUௐ H[SRVXUHௐDQGௐDXWRQRP\ௐUHTXLUHPHQWV
3URGXFWௐ'HOLYHU\
&RPSOHWHௐV\VWHPVௐ
VRODUௐSDQHOVௐEDWWHULHVௐSROHVௐDQGௐ/('ௐIL[WXUHV
ௐZHUHௐVKLSSHGௐ
GLUHFWO\ௐWRௐWKHௐFLW\¶VௐSXEOLFௐZRUNVௐGHSDUWPHQW
,QVWDOODWLRQௐ&RRUGLQDWLRQ
)RQURFKHௐSURYLGHGௐLQVWDOODWLRQௐWUDLQLQJௐDQGௐVXSSRUWௐWRௐWKHௐFLW\¶VௐVHOHFWHGௐORFDOௐFRQWUDFWRU 7HFKQLFDOௐGRFXPHQWVௐDQGௐPRXQWLQJௐLQVWUXFWLRQVௐHQVXUHGௐFRUUHFWௐVHWXS &RPPLVVLRQLQJௐ ௐ4XDOLW\ௐ&KHFN
)RQURFKHௐSHUVRQQHOௐYLVLWHGௐWKHௐVLWHௐIRUௐV\VWHPௐYHULILFDWLRQௐDQGௐFRPPLVVLRQLQJ (DFKௐOLJKWௐZDVௐWHVWHGௐIRUௐIXQFWLRQDOLW\ௐSURSHUௐRULHQWDWLRQௐDQGௐSHUIRUPDQFHௐPHWULFV 3RVW,QVWDOODWLRQௐ6XSSRUW
7KHௐFLW\ௐZDVௐSURYLGHGௐDFFHVVௐWRௐRSWLRQDOௐPRQLWRULQJௐWRROVௐDQGௐDௐSRLQWௐRIௐFRQWDFWௐIRUௐ ZDUUDQW\ௐVXSSRUW

Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 121 of 1283 ends

7DEOH
([FHSWLRQVWR7HUPV&RQGLWLRQVRU6SHFLILFDWLRQV)RUP /LQH,WHP 127,&(
7RLGHQWLI\DQ\H[FHSWLRQRUWRUHTXHVWDQ\PRGLILFDWLRQWR6RXUFHZHOOVWDQGDUG0DVWHU$JUHHPHQWWHUPV FRQGLWLRQVRUVSHFLILFDWLRQVD3URSRVHUPXVWVXEPLWWKHSURSRVHGH[FHSWLRQ V
RUUHTXHVWHGPRGLILFDWLRQ
V
YLDUHGOLQHLQWKH0DVWHU
$JUHHPHQW7HPSODWHSURYLGHGLQWKH³%LG'RFXPHQWV´VHFWLRQ3URSRVHUPXVWXSORDGWKHUHGOLQHLQWKH³5HTXHVWHG([FHSWLRQV´XSORDG ILHOG$OOH[FHSWLRQVDQGRUSURSRVHGPRGLILFDWLRQVDUHVXEMHFWWRUHYLHZDQGDSSURYDOE\6RXUFHZHOODQGZLOOQRWDXWRPDWLFDOO\EH LQFOXGHGLQWKH0DVWHU$JUHHPHQW
'R\RXKDYHH[FHSWLRQVRUPRGLILFDWLRQVWRSURSRVH" $FNQRZOHGJHP HQW  <HV
1R
'RFXPHQWV
(QVXUH\RXUVXEPLVVLRQGRFXPHQW
V
FRQIRUPVWRWKHIROORZLQJ

'RFXPHQWVLQ3')IRUPDWDUHSUHIHUUHG'RFXPHQWVLQ:RUG([FHORUFRPSDWLEOHIRUPDWVPD\DOVREHSURYLGHG 'RFXPHQWVVKRXOG127KDYHDVHFXULW\SDVVZRUGDV6RXUFHZHOOPD\QRWEHDEOHWRRSHQWKHILOH,WLV\RXUVROHUHVSRQVLELOLW\WR HQVXUHWKDWWKHXSORDGHGGRFXPHQW
V
DUHQRWHLWKHUGHIHFWLYHFRUUXSWHGRUEODQNDQGWKDWWKHGRFXPHQWVFDQEHRSHQHGDQGYLHZHGE\ 6RXUFHZHOO
6RXUFHZHOOPD\UHMHFWDQ\UHVSRQVHZKHUHDQ\GRFXPHQW V
FDQQRWEHRSHQHGDQGYLHZHGE\6RXUFHZHOO
,I\RXQHHGWRXSORDGPRUHWKDQRQH

GRFXPHQWIRUDVLQJOHLWHP\RXVKRXOGFRPELQHWKHGRFXPHQWVLQWRRQH]LSSHGILOH,IWKH ]LSSHGILOHFRQWDLQVPRUHWKDQRQH

GRFXPHQWHQVXUHHDFKGRFXPHQWLVQDPHGLQUHODWLRQWRWKHVXEPLVVLRQIRUPDWLWHPUHVSRQGLQJ WR)RUH[DPSOHLIUHVSRQGLQJWRWKH0DUNHWLQJ3ODQFDWHJRU\VDYHWKHGRFXPHQWDV³0DUNHWLQJ3ODQ´ 3ULFLQJ6RXUFHZHOO&RRS3URGXFW&DWDORJSGI7XHVGD\$SULO 

)LQDQFLDO6WUHQJWKDQG6WDELOLW\)RQURFKH/LJKWLQJ$PHULFD)LQDQFLDO6WDWHPHQWVGHISGI7XHVGD\$SULO 

0DUNHWLQJ3ODQ6DPSOHV)2152&+(0$5.(7,1*3/$16285&(:(//SGI7XHVGD\$SULO 

:0%(0%(6%(RU5HODWHG&HUWLILFDWHV

RSWLRQDO

6WDQGDUG7UDQVDFWLRQ'RFXPHQW6DPSOHV6WDQGDUG7UDQVDFWLRQ6DPSOHSGI7XHVGD\$SULO 

5HTXHVWHG([FHSWLRQV

RSWLRQDO

8SORDG$GGLWLRQDO'RFXPHQW)L[WXUHVLQIRSGI7XHVGD\$SULO 

Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 122 of 1283 ends

$GGHQGD7HUPVDQG&RQGLWLRQV


352326(5$)),'$9,72)&203/,$1&(
,FHUWLI\WKDW,DPDQDXWKRUL]HGUHSUHVHQWDWLYHRI3URSRVHUDQGKDYHDXWKRULW\WRVXEPLWWKHIRUHJRLQJ3URSRVDO

7KH3URSRVHULVVXEPLWWLQJWKLV3URSRVDOXQGHULWVIXOODQGFRPSOHWHOHJDOQDPHDQGWKH3URSRVHUOHJDOO\H[LVWVLQJRRGVWDQGLQJLQWKH MXULVGLFWLRQRILWVUHVLGHQFH
7KH3URSRVHUZDUUDQWVWKDWWKHLQIRUPDWLRQSURYLGHGLQWKLV3URSRVDOLVWUXHFRUUHFWDQGUHOLDEOHIRUSXUSRVHVRIHYDOXDWLRQIRU DZDUG
7KH3URSRVHUFHUWLILHVWKDW


7KHSULFHVLQWKLV3URSRVDOKDYHEHHQDUULYHGDWLQGHSHQGHQWO\ZLWKRXWIRUWKHSXUSRVHRIUHVWULFWLQJFRPSHWLWLRQDQ\ FRQVXOWDWLRQFRPPXQLFDWLRQRUDJUHHPHQWZLWKDQ\RWKHU3URSRVHURUFRPSHWLWRUUHODWLQJWR 
L
7KRVHSULFHV


LL
7KHLQWHQWLRQWRVXEPLWDQRIIHU
RU

LLL
7KHPHWKRGVRUIDFWRUVXVHGWRFDOFXODWHWKHSULFHVRIIHUHG 

7KHSULFHVLQWKLV3URSRVDOKDYHQRWEHHQDQGZLOOQRWEHNQRZLQJO\GLVFORVHGE\WKH3URSRVHUGLUHFWO\RULQGLUHFWO\WRDQ\RWKHU 3URSRVHURUFRPSHWLWRUEHIRUHDZDUGXQOHVVRWKHUZLVHUHTXLUHGE\ODZ DQG


1RDWWHPSWKDVEHHQPDGHRUZLOOEHPDGHE\3URSRVHUWRLQGXFHDQ\RWKHUFRQFHUQWRVXEPLWRUQRWWRVXEPLWD3URSRVDOIRUWKH SXUSRVHRIUHVWULFWLQJFRPSHWLWLRQ
7RWKHEHVWRILWVNQRZOHGJHDQGEHOLHIDQGH[FHSWDVRWKHUZLVHGLVFORVHGLQWKH3URSRVDOWKHUHDUHQRUHOHYDQWIDFWVRU FLUFXPVWDQFHVZKLFKFRXOGJLYHULVHWRDQRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVW$QRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVWLVFUHDWHGZKHQD FXUUHQWRUSURVSHFWLYHVXSSOLHULVXQDEOHWRUHQGHULPSDUWLDOVHUYLFHWR6RXUFHZHOOGXHWRWKHVXSSOLHU¶V DFUHDWLRQRIHYDOXDWLRQFULWHULD
GXULQJSHUIRUPDQFHRIDSULRUDJUHHPHQWZKLFKSRWHQWLDOO\LQIOXHQFHVIXWXUHFRPSHWLWLYHRSSRUWXQLWLHVWRLWVIDYRU EDFFHVVWRQRQSXEOLF
DQGPDWHULDOLQIRUPDWLRQWKDWPD\SURYLGHIRUDFRPSHWLWLYHDGYDQWDJHLQDODWHUSURFXUHPHQWFRPSHWLWLRQ FLPSDLUHGREMHFWLYLW\LQ
SURYLGLQJDGYLFHWR6RXUFHZHOO
3URSRVHUZLOOSURYLGHWR6RXUFHZHOO3DUWLFLSDWLQJ(QWLWLHV6ROXWLRQVLQDFFRUGDQFHZLWKWKHWHUPVFRQGLWLRQVDQGVFRSHRIDUHVXOWLQJ PDVWHUDJUHHPHQW
7KH3URSRVHUSRVVHVVHVRUZLOOSRVVHVVDOODSSOLFDEOHOLFHQVHVRUFHUWLILFDWLRQVQHFHVVDU\WRGHOLYHU6ROXWLRQVXQGHUDQ\UHVXOWLQJ PDVWHUDJUHHPHQW
7KH3URSRVHUZLOOFRPSO\ZLWKDOODSSOLFDEOHSURYLVLRQVRIIHGHUDOVWDWHDQGORFDOODZVUHJXODWLRQVUXOHVDQGRUGHUV 3URSRVHULWVHPSOR\HHVDJHQWVDQGVXEFRQWUDFWRUVDUHQRW

 ,QFOXGHGRQWKH³6SHFLDOO\'HVLJQDWHG1DWLRQDOVDQG%ORFNHG3HUVRQV´OLVWPDLQWDLQHGE\WKH2IILFHRI)RUHLJQ$VVHWV&RQWURORIWKH 8QLWHG6WDWHV'HSDUWPHQWRIWKH7UHDVXU\IRXQGDW
KWWSV
ZZZWUHDVXU\JRYRIDFGRZQORDGVVGQOLVWSGI

 ,QFOXGHGRQWKHJRYHUQPHQWZLGHH[FOXVLRQVOLVWVLQWKH8QLWHG6WDWHV6\VWHPIRU$ZDUG0DQDJHPHQWIRXQGDW

KWWSV
VDPJRY6$0
RU
 3UHVHQWO\GHEDUUHGVXVSHQGHGSURSRVHGIRUGHEDUPHQWGHFODUHGLQHOLJLEOHRUYROXQWDULO\H[FOXGHGIURPSURJUDPVRSHUDWHGE\WKH 6WDWHRI0LQQHVRWD
WKH8QLWHG6WDWHVIHGHUDOJRYHUQPHQWDVDSSOLFDEOH
RUDQ\3DUWLFLSDWLQJ(QWLW\9HQGRUFHUWLILHVDQGZDUUDQWV WKDWQHLWKHULWQRULWVSULQFLSDOVKDYHEHHQFRQYLFWHGRIDFULPLQDORIIHQVHUHODWHGWRWKHVXEMHFWPDWWHURIWKLVVROLFLWDWLRQ %\FKHFNLQJWKLVER[,DFNQRZOHGJHWKDW,DPERXQGE\WKHWHUPVRIWKH3URSRVHU¶V$IILGDYLWKDYHWKHOHJDODXWKRULW\WRVXEPLWWKLV 3URSRVDORQEHKDOIRIWKH3URSRVHUDQGWKDWWKLVHOHFWURQLFDFNQRZOHGJPHQWKDVWKHVDPHOHJDOHIIHFWYDOLGLW\DQGHQIRUFHDELOLW\DVLI, KDGKDQGVLJQHGWKH3URSRVDO7KLVVLJQDWXUHZLOOQRWEHGHQLHGVXFKOHJDOHIIHFWYDOLGLW\RUHQIRUFHDELOLW\VROHO\EHFDXVHDQHOHFWURQLF VLJQDWXUHRUHOHFWURQLFUHFRUGZDVXVHGLQLWVIRUPDWLRQ'DOH&XUWLV936DOHV)RQURFKH/LJKWLQJ$PHULFD 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 123 of 1283 ends

7KH3URSRVHUGHFODUHVWKDWWKHUHLVDQDFWXDORUSRWHQWLDO&RQIOLFWRI,QWHUHVWUHODWLQJWRWKHSUHSDUDWLRQRILWVVXEPLVVLRQDQGRUWKH 3URSRVHUIRUHVHHVDQDFWXDORUSRWHQWLDO&RQIOLFWRI,QWHUHVWLQSHUIRUPLQJWKHREOLJDWLRQVFRQWHPSODWHGLQWKHVROLFLWDWLRQSURSRVDO 

<HV 1R
7KH%LGGHUDFNQRZOHGJHVDQGDJUHHVWKDWWKHDGGHQGXPDGGHQGDEHORZIRUPSDUWRIWKH%LG'RFXPHQW &KHFNWKHER[LQWKHFROXPQ,KDYHUHYLHZHGWKLVDGGHQGXP EHORZWRDFNQRZOHGJHHDFKRIWKHDGGHQGD )LOH1DPH
,KDYHUHYLHZHGWKH
EHORZDGGHQGXPDQG
DWWDFKPHQWV
LI

DSSOLFDEOH

3DJHV
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
)UL$SULO
30 
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
7XH$SULO

30 
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
7KX0DUFK
30 
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
:HG0DUFK
30 
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
7XH0DUFK


$0 
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
7XH0DUFK
$0 
$GGHQGXPBB6PDUWB,QIUDVWUXFWXUHB5)3
:HG0DUFK
$0 
Bid Number: RFP 041525 Vendor Name: Fonroche Lighting America 
 

!





 




Page 124 of 1283 ends

38077.00180\34047676.2 C2

EXHIBIT “C”
CONTRACTOR’S PROPOSAL

Item
Description Quantity Unit Cost Total
[T54-CK16B-
4K-TBD]
[P310F-3P]HW-
MC
Fixture Color:

BK
POLE: 25Ft.

Round
Tapered Pole-
Anchor
Base-1-4 FT
Arm
--Pole Color: BK
SmartLight Assembly with 936Wh-24V
NiMH Battery, special extreme
temperature (from -40 °F to +158 °F),
310W solar module with Top of Pole
assembly and Intelligent
management/control system. Provisioned
for Single Fixture configuration.

Single Essential (Formerly CK16B) Fixture
4K Color Temp.-Type TBD Fixture Color:

BK - . System color is black. Mount: High
wind and enhanced marine coating. 25Ft.

Round Tapered Pole-Anchor Base-1-4 FT
Arm --Pole Color is BK. 8 Year Warranty
All Night Lighting 365 Days a Year - Full
Battery Replacement
Assumes No Shading | Assumes little or no
snow
10 Degrees Tilt
100% =28 Watts worst case conditions. T-
PM: 5 hrs. @100% | T-N (Balance of
night)
@80% | T-AM: 1 hrs. @100%
6 $5,077 $30,462
Gateway Fonroche Connect Gateway enables
optional wireless networking and customer
portal access. With long-range LoRA
communication, you can connect one or
more SmartLight Projects for monitoring
and reporting. Communications included,
NO MONTHLY FEES.
1 $ 1,388 $1,388
Labor Delivery, handling, and installation 1 $ 65,000 $ 65,000 Programming, Ship and Handling 1 $3,862 $3,862
TOTAL $100,712

Page 125 of 1283 ends
Page 126 of 1283 ends
Page 127 of 1283 ends
Page 128 of 1283 ends
Page 129 of 1283 ends
Page 130 of 1283 ends
Page 131 of 1283 ends
Page 132 of 1283 ends
Page 133 of 1283 ends
Page 134 of 1283 ends
Page 135 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 1 ends

RFP #041525

REQUEST FOR PROPOSALS
for
Smart Infrastructure Solutions, Outdoor Sensors,
and Related Products and Services

Proposal Due Date: April 15, 4:30 p.m., Central Time

Sourcewell, a State of Minnesota local government unit and service cooperative, is requesting proposals for Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services to result in a procurement solution for use by its Participating Entities. Sourcewell Participating Entities include thousands of governmental, higher education, K-12 education, nonprofit, tribal government, and other public agencies located in the United States and Canada. A full copy of the Request for Proposals can be found on the Sourcewell Procurement Portal [https://proportal.sourcewell-mn.gov]. Only proposals submitted through the Sourcewell Procurement Portal will be considered. Proposals are due no later than April 15, 2025, at 4:30 p.m. Central Time, and late proposals will not be considered.

SOLICITATION SCHEDULE

Public Notice of RFP Published: February 25, 2025
Pre-proposal Conference: March 20, 2025, 10:00 a.m., Central Time Question Submission Deadline: April 7, 2025, 4:30 p.m., Central Time Proposal Due Date: April 15, 2025, 4:30 p.m., Central Time Late responses will not be considered.

Opening: April 15, 2025, 4:30 p.m., Central Time
See RFP Section V.G. “Opening”

Page 136 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 2 ends

I. ABOUT SOURCEWELL

A. SOURCEWELL

Sourcewell is a State of Minnesota local government unit and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that facilitates a competitive public solicitation and master agreement award process for the benefit of its 50,000+ participating entities across the United States and Canada. Sourcewell’s solicitation process complies with State of Minnesota law and policies, conforms to Canadian trade agreements (including Canadian Free Trade Agreement, Ontario-Quebec Trade and Cooperation Agreement, and Canada-European Union Comprehensive Economic and Trade Agreement, as applicable), and results in cooperative purchasing solutions from which Sourcewell’s Participating Entities procure equipment, products, and services.

Cooperative purchasing provides participating entities and suppliers increased administrative efficiencies and the power of combined purchasing volume that result in overall cost savings. At times, Sourcewell also partners with other purchasing cooperatives to combine the purchasing volume of their membership into a single solicitation and master agreement expanding the reach of awarded suppliers’ potential pool of end users.

Sourcewell uses a website-based platform, the Sourcewell Procurement Portal, through which all proposals to this RFP must be submitted.

B. USE OF RESULTING MASTER AGREEMENTS

In the United States, Sourcewell’s master agreements are available for use by:
x Federal and state government entities;
x Cities, towns, and counties/parishes;
x Education service cooperatives;
x K-12 and higher education entities;
x Tribal government entities;
x Some nonprofit entities; and
x Other public entities.

In Canada, Sourcewell’s master agreements are available for use by current and future members including:
x Federal, provincial, and territorial government departments, ministries, agencies, boards, councils, committees, commissions, and similar agencies; x Indigenous self-governing bodies;
x Regional, local, district, and other forms of municipal government, municipal organizations, school boards, and publicly funded academic, health, and social service entities referred to as MASH sector (this should be construed to include but not be

Page 137 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 3 ends

limited to the cities of Calgary, Edmonton, Toronto, Ottawa, and Winnipeg), as well as any corporation or entity owned or controlled by one or more of the preceding entities; x Crown corporations, government enterprises, and other entities that are owned or controlled by these entities through ownership interest; and x Canoe procurement group of Canada’s current and future members. Canoe members include:
o Federal, provincial and territorial government departments, ministries, agencies, boards, councils, committees, commissions, and similar agencies; o Crown corporations, government enterprises, and other entities that are owned or controlled by these entities through ownership interest; o Indigenous self-governing bodies;
o Airport authorities;
o Regional, local, district, and other forms of municipal government, municipal organizations, school boards, and publicly funded academic, health, and social service entities referred to as MASH sector (this should be construed to include but not be limited to the cities of Calgary, Edmonton, Toronto, Ottawa, and Winnipeg), as well as any corporation or entity owned or controlled by one or more of the preceding entities; and
o Canoe procurement group of Canada’s current and future partner associations, including Saskatchewan Association of Rural Municipalities, Association of Manitoba Municipalities, Local Authorities Services/Association of Municipalities Ontario, Nova Scotia Federation of Municipalities, Federation of Prince Edward Island Municipalities, Municipalities Newfoundland Labrador, Union of New Brunswick Municipalities, Northwest Territories Association of Communities, Association of Yukon Communities, CivicInfo BC, Association and their current and future members.

For a listing of current United States and Canadian Participating Entities visit Sourcewell’s website (note: there is a tab for each country): https://www.sourcewell-mn.gov/sourcewell-for- vendors/agency-locator.

Participating Entities typically access master agreements for equipment, products, or services through a purchase order issued directly to the awarded supplier. A Participating Entity may request additional terms or conditions related to a purchase. Use of Sourcewell master agreements is voluntary and Participating Entities retain the right to obtain similar equipment, products, or services from other sources.

To meet Participating Entities’ needs, Sourcewell broadly publishes public notice of all solicitation opportunities, including this RFP. In addition, where applicable, other purchasing cooperatives and procurement officials receive notice and are encouraged to re-post the solicitation opportunity.

Proof of publication will be available at the conclusion of the solicitation process.

Page 138 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 4 ends

C. INTERGOVERNMENTAL SUPPORT AGREEMENTS

Pursuant to 10 U.S.C. § 2679, United States Department of Defense authorized installations may access Sourcewell's awarded cooperative purchasing master agreements through an Intergovernmental Support Agreement with Sourcewell. All transactions completed through this Intergovernmental Support program are directly facilitated by Sourcewell and may be subject to additional terms and conditions.

II. SOLICITATION DETAILS

A. SOLUTIONS-BASED SOLICITATION

This RFP and contract award process is a solutions-based solicitation; meaning that Sourcewell is seeking equipment, products, or services that meet the general requirements of the scope of this RFP and are commonly desired or are required by law or industry standards.

B. REQUESTED EQUIPMENT, PRODUCTS, OR SERVICES

It is expected that proposers will offer a wide array of equipment, products, or services at lower prices and with better value than what they would ordinarily offer to a single government entity, school district, or regional cooperative.

Sourcewell is seeking solutions for Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services. The solutions should provide comprehensive capabilities to support diverse use cases such as environmental monitoring, public safety, traffic management, and energy efficiency, and include, but not limited to:

1. Outdoor sensors or advanced sensor-integrated luminaires capable of detecting, including but not limited to:
a. Air quality parameters;
b. Lighting levels and energy usage;
c. Noise levels, including gunshot and anomaly detection; d. Pedestrian and vehicle movement and presence; and,
e. Weather conditions.

2. Physical assets, poles, and mounting structures to support connected smart infrastructure systems.

3. Network components, gateways, controllers, communication modules, or specialized platforms necessary for connectivity, remote control, monitoring, data collection, and management of smart infrastructure systems and sensors.

4. Integration or turnkey services directly related to 1. – 3. above, including deployment, integration as a service (IaaS), configuration, training, support, centralized data collection, and integration with existing smart city systems. Optional components may include Vehicle-to-Everything (V2X) capabilities for real-time communication with vehicles to enhance traffic flow, safety, and support autonomous systems.

Page 139 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 5 ends

Sourcewell is seeking market-ready solutions for outdoor applications. Proposers may offer software development ONLY as a supplemental service that supports and enhances the proven, market-ready solutions.

This solicitation does not include those equipment, products, or services covered under categories included in pending or planned Sourcewell solicitations, or in contracts currently maintained by Sourcewell, identified below:

1. Parking Management Systems with Related Equipment, Supplies, and Services (RFP #080321) except for those complementary and directly related to solutions 1. – 4. above.

2. Facility MRO, Industrial, and Building-Related Supplies and Equipment (RFP #091422).

3. Scoreboards, Digital Displays, and Video Boards with Related Services (RFP #030223) except for those complementary and directly related to solutions 1. – 4. above.

4. Sports Lighting Solutions with Related Technology, Equipment, and Services (RFP #041123) except for those complementary and directly related to solutions 1. – 4. above.

5. Public Safety Video Surveillance Solutions with Related Equipment, Software and Accessories (RFP #101223) except for those complementary and directly related to solutions 1. – 4. above.

6. Curb Management Technologies with Related Services (RFP #120423) except for those complementary and directly related to solutions 1. – 4. above.

7. Technology Products and Services with Related Solutions (RFP #121923).

8. Private Wireless Services with Related Solutions (RFP #020624).

9. Wireless Voice and Data Services with Related Solutions, Equipment, and Accessories (RFP #031924).

10. Software Solutions with Related Services for Public Sector and Education Administration (RFP #060624).

11. Fleet Management Technologies with Related Software Solutions (RFP #102924) except for those complementary and directly related to solutions 1. – 4. above.

12. Facility Security Systems, Equipment, and Software with Related Services (RFP #121024).

13. Public Safety Communications Technology and Hardware Solutions (RFP #020625) except for those complementary and directly related to solutions 1. – 4. above.

14. Electric Vehicle Supply Equipment (RFP #021825) except for those complementary and directly related to solutions 1. – 4. above.

15. Public Safety Software (RFP #030425).

Generally, the solutions for Participating Entities are turn-key solutions, providing a combination of equipment, products and services, delivery, and installation to a properly operating status. However, equipment-only or products-only solutions may be appropriate for situations where Participating Entities possess the ability, either in-house or through local third- party contractors, to properly install and bring to operation the equipment or products being proposed.

Page 140 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 6 ends

Sourcewell prefers suppliers that provide a sole source of responsibility for the equipment, products, and services provided under a resulting master agreement. If proposer is including the equipment, products, and services of its subsidiary entities, the proposer must also identify all included subsidiaries in its proposal. If proposer requires the use of distributors, dealers, resellers, or subcontractors to provide the equipment, products, or services, the proposal must address how the equipment, products or services will be provided to Participating Entities, and describe the network of distributors, dealers, resellers, and/or subcontractors that will be available to serve Participating Entities under a resulting master agreement.

Sourcewell encourages suppliers to offer the broadest possible selection of equipment, products, and services being proposed over the largest possible geographic area and to the largest possible cross-section of Sourcewell current and future Participating Entities.

C. REQUIREMENTS

It is expected that proposers have knowledge of all applicable industry standards, laws, and regulations and possess an ability to market and distribute the equipment, products, or services to Participating Entities.

1. Safety Requirements. All items proposed must comply with current applicable safety or regulatory standards or codes.

2. Deviation from Industry Standard. Deviations from industry standards must be identified with an explanation of how the equipment, products, and services will provide equivalent function, coverage, performance, and/or related services.

3. New Equipment and Products. Proposed equipment and products must be for new, current model; however, proposer may offer certain close-out equipment or products if it is specifically noted in the Pricing proposal.

4. Delivered and operational. Unless clearly noted in the proposal, equipment and products must be delivered to the Participating Entity as operational.

5. Warranty. All equipment, products, supplies, and services must be covered by a warranty that is the industry standard or better.

D. PROSPECTIVE MASTER AGREEMENT TERM

The term of any resulting master agreement(s) awarded by Sourcewell under this solicitation will be four years. Sourcewell and supplier may agree to up to three additional one-year extensions based on the best interests of Sourcewell and its Participating Entities. Sourcewell retains the right to consider additional extensions beyond seven years as required under exceptional circumstances.

E. ESTIMATED MASTER AGREEMENT VALUE AND USAGE

Based on past volume of similar master agreements, the estimated annual value of all transactions from master agreements resulting from this RFP are anticipated to be USD 30

Page 141 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 7 ends

Million; therefore, proposers are expected to propose volume pricing. Sourcewell anticipates considerable activity under the master agreement(s) awarded from this RFP; however, sales and sales volume from any resulting master agreement are not guaranteed.

F. MARKETING PLAN

Proposer’s sales force will be the primary source of communication with Participating Entities.

The proposer’s Marketing Plan should demonstrate proposer’s ability to deploy a sales force or dealer network to Participating Entities, as well as proposer’s sales and service capabilities. It is expected that proposer will promote and market any master agreement award.

G. ADDITIONAL CONSIDERATIONS

1. Master agreements will be awarded to proposers able to best meet the need of Participating Entities. Proposers should submit their complete line of equipment, products, or services that are applicable to the scope of this RFP.

2. A proposer may submit only one proposal. If related, affiliated, or subsidiary entities elect to submit separate proposals, rather than a single parent-entity proposal, each such proposal must be prepared independently and without cooperation, collaboration, or collusion.

3. If a proposer works with a consultant on its proposal, the consultant (an individual or company) may not assist any other entity with a proposal for this solicitation.

4. Proposers should include all relevant information in its proposal, since Sourcewell cannot consider information that is not included in the proposal. Sourcewell reserves the right to verify proposer’s information and may request clarification from a proposer, including samples of the proposed equipment or products.

5. Depending upon the responses received in a given category, Sourcewell may need to organize responses into subcategories in order to provide the broadest coverage of the requested equipment, products, or services to Participating Entities. Awards may be based on a subcategory.

6. A proposer’s documented negative past performance with Sourcewell or its Participating Entities occurring under a previously awarded Sourcewell master agreement may be considered in the evaluation of a proposal.

Page 142 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 8 ends

III. PRICING
A. REQUIREMENTS

All proposed pricing must be:

1. Either Line-Item Pricing or Percentage Discount from Catalog Pricing, or a combination of these:
a. Line-item Pricing is pricing based on each individual product or service. Each line must indicate the proposer’s published “List Price,” as well as the “Master Agreement Price.”
b. Percentage Discount from Catalog or Category is based on a percentage discount from a catalog or list price, defined as a published Manufacturer’s Suggested Retail Price (MSRP) for the products or services. Individualized percentage discounts can be applied to any number of defined product groupings. Proposers will be responsible for providing and maintaining current published MSRP with Sourcewell, and this pricing must be included in its proposal and provided throughout the term of any master agreement resulting from this RFP.

2. The proposer’s not to exceed price. A not to exceed price is the highest price for which equipment, products, or services may be billed to a Participating Entity. However, it is permissible for suppliers to sell at a price that is lower than the agreed upon price.

3. Stated in U.S. and Canadian dollars (as applicable).

4. Clearly understandable, complete, and fully describe the total cost of acquisition (e.g., the cost of the proposed equipment, products, and services delivered and operational for its intended purpose in the Participating Entity’s location).

Proposers should clearly identify any costs that are NOT included in the proposed product or service pricing. This may include items such as installation, set up, mandatory training, or initial inspection. Include identification of any parties that impose such costs and their relationship to the proposer. Additionally, proposers should clearly describe any unique distribution and/or delivery methods or options offered in the proposal.

B. ADMINISTRATIVE FEES

Proposers awarded a master agreement are expected to pay to Sourcewell an administrative fee in exchange for Sourcewell facilitating the resulting master agreements. The administrative fee is normally calculated as a percentage of the total sales to Participating Entities for all equipment, products, or services made during a calendar quarter, and is typically one percent (1%) to two percent (2%). In some categories, a flat fee may be an acceptable alternative.

IV. MASTER AGREEMENT

Proposers awarded a master agreement will be required to execute a master agreement with Sourcewell (see attached template). Only those modifications the proposer indicates in its proposal will be available for discussion. Much of the language in the Master Agreement

Page 143 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 9 ends

reflects Minnesota legal requirements and cannot be altered. Numerous and/or onerous exceptions that contradict Minnesota law may result in the proposal being disqualified from further review and evaluation.

To identify any exception, or to request any modification, to Sourcewell’s standard master agreement terms, conditions, or specifications, a proposer must submit the proposed exception(s) or requested modification(s) via redline in the Master Agreement Template provided in the “Documents” section of the “Bid Details” page on the Sourcewell Procurement Portal and uploaded as part of its response. Only those exceptions noted at the time of the proposal submission will be considered.

Exceptions must:

1. Clearly identify the affected article and section.

2. Clearly note the requested modification; and as applicable, provide requested alternative language.

Unclear requests will be automatically denied.

Only those exceptions that have been accepted by Sourcewell will be included in the master agreement document provided to the awarded supplier for signature.

If a proposer receives a master agreement award resulting from this solicitation it will have up to 30 days to sign and return the master agreement. After that time, at Sourcewell’s sole discretion, the master agreement award may be revoked.

V. RFP PROCESS

A. PRE-PROPOSAL CONFERENCE

Sourcewell will hold an optional, non-mandatory pre-proposal conference via webcast on the date and time noted in the Solicitation Schedule for this RFP and on the Sourcewell Procurement Portal. The purpose of this conference is to allow potential proposers to ask questions regarding this RFP and Sourcewell’s competitive procurement process. Information about the webcast will be sent to all entities that have registered for this solicitation opportunity through their Sourcewell Procurement Portal Vendor Account. Pre-proposal conference attendance is optional.

B. QUESTIONS REGARDING THIS RFP AND ORAL COMMUNICATION

All questions regarding this RFP must be submitted through the Sourcewell Procurement Portal.

The deadline for submission of questions is found in the Solicitation Schedule and on the Sourcewell Procurement Portal. Answers to questions will be issued through an addendum to this RFP. Repetitive questions will be summarized into a single answer and identifying information will be removed from the submitted questions.

Page 144 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 10 ends

All questions, whether specific to a proposer or generally related to the RFP, must be submitted using this process. Do not contact individual Sourcewell staff to ask questions or request information as this may disqualify the proposer from responding to this RFP. Sourcewell will not respond to questions submitted after the deadline.

C. ADDENDA

Sourcewell may modify this RFP at any time prior to the proposal due date by issuing an addendum. Addenda issued by Sourcewell become a part of the RFP and will be delivered to potential proposers through the Sourcewell Procurement Portal. Sourcewell accepts no liability in connection with the delivery of any addenda.

Before a proposal will be accepted through the Sourcewell Procurement Portal, all addenda, if any, must be acknowledged by the proposer by checking the box for each addendum. It is the responsibility of the proposer to check for any addenda that may have been issued up to the solicitation due date and time.

If an addendum is issued after a proposer submitted its proposal, the Sourcewell Procurement Portal will WITHDRAW the submission and change the proposer’s proposal status to INCOMPLETE. The proposer can view this status change in the “MY BIDS” section of the Sourcewell Procurement Portal Vendor Account. The proposer is solely responsible to check the “MY BIDS” section of the Sourcewell Procurement Portal Vendor Account periodically after submitting its proposal (and up to the Proposal Due Date). If the proposer’s proposal status has changed to INCOMPLETE, the proposer is solely responsible to:

1. make any required adjustments to its proposal;

2. acknowledge the addenda; and

3. ensure the re-submitted proposal is received through the Sourcewell Procurement Portal no later than the Proposal Due Date and time shown in the Solicitation Schedule above.

D. PROPOSAL SUBMISSION

Proposer’s complete proposal must be submitted through the Sourcewell Procurement Portal no later than the date and time specified in the Solicitation Schedule. Any other form of proposal submission, whether electronic, paper, or otherwise, will not be considered by Sourcewell. Late proposals will not be considered. It is the proposer’s sole responsibility to ensure that the proposal is received on time.

It is recommended that proposers allow sufficient time to upload the proposal and to resolve any issues that may arise. The time and date that a proposal is received by Sourcewell is solely determined by the Sourcewell Procurement Portal web clock.

In the event of problems with the Sourcewell Procurement Portal, follow the instructions for technical support posted in the portal. It may take up to 24 hours to respond to certain issues.

Page 145 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 11 ends

Upon successful submission of a proposal, the Sourcewell Procurement Portal will automatically generate a confirmation email to the proposer. If the proposer does not receive a confirmation email, contact Sourcewell’s support provider at [email protected].

To ensure receipt of the latest information and updates via email regarding this solicitation, or if the proposer has obtained this solicitation document from a third party, the onus is on the proposer to create a Sourcewell Procurement Portal Vendor Account and register for this solicitation opportunity.

Within the Sourcewell Procurement Portal, all proposals must be digitally acknowledged by an authorized representative of the proposer attesting that the information contained in the proposal is true and accurate. By submitting a proposal, proposer warrants that the information provided is true, correct, and reliable for purposes of evaluation for potential master agreement award. The submission of inaccurate, misleading, or false information is grounds for disqualification from a master agreement award and may subject the proposer to remedies available by law.

E. GENERAL PROPOSAL REQUIREMENTS

Proposals must be:

1. In substantial compliance with the requirements of this RFP or it will be considered nonresponsive and be rejected.

2. Complete. A proposal will be rejected if it is conditional or incomplete.

3. Submitted in English.

4. Valid and irrevocable for 90 days following the Proposal Due Date.

Any and all costs incurred in responding to this RFP will be borne by the proposer.

F. PROPOSAL WITHDRAWAL

Prior to the proposal deadline, a proposer may withdraw its proposal.

G. OPENING

The Opening of proposals will be conducted in the Sourcewell Procurement Portal immediately following the proposal due date and time. To view the list of proposers resulting from the opening, verify that the Sourcewell Procurement Portal opportunities list search is set to “All” or “Closed.”

Members of the public may attend the Opening at Sourcewell’s office located at 202 12th Street NE, Staples, MN to hear the results.

VI. EVALUATION AND AWARD

Page 146 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 12 ends

A. EVALUATION

It is the intent of Sourcewell to award one or more master agreements to responsive and responsible proposers offering the best overall quality, selection of equipment, products, and services, and price that meet the commonly requested specifications of Sourcewell and its Participating Entities. The award(s) will be limited to the number of proposers that Sourcewell determines is necessary to meet the needs of its Participating Entities.

Factors to be considered in determining the number of master agreements to be awarded in any category may include the following:

1. Total evaluation scores (giving consideration to natural breaks in the scoring of responsive proposals);

2. The number and geographic location of highest-scoring proposers that offer:
a. A comprehensive selection of the requested equipment, products, or services; b. A sales and service network ensuring availability and coverage for Participating Entities’ use; and
c. Other attributes of the proposer or contents of its proposal that assist Participating Entities in achieving environmental and social requirements, and goals.

Information submitted as part of a proposal should be as specific as possible when responding to the RFP. Do not assume Sourcewell has any knowledge about a specific supplier or product.

B. AWARD(S)

Award(s) will be made to the highest-scoring proposer(s) whose proposal conforms to all conditions and requirements of the RFP, and consistent with the award criteria defined in this RFP.

Sourcewell may request written clarification of a proposal at any time during the evaluation process.

Proposal evaluation will be based on the following scoring criteria and the Sourcewell Evaluator Scoring Guide (a copy is available in the Sourcewell Procurement Portal):

Conformance to RFP Requirements Pass/Fail
Financial Viability and Marketplace Success 50
Ability to Sell and Deliver Solutions 150
Marketing Plan 100
Value Added Attributes 100
Depth and Breadth of Offered Solutions 200
Pricing 400
TOTAL POINTS 1000

Page 147 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 13 ends

C. PROTESTS OF AWARDS

Any protest made under this RFP by a proposer must be in writing, addressed to Sourcewell’s Executive Director, and delivered to the Sourcewell office located at 202 12th Street NE, P.O.

Box 219, Staples, MN 56479. All documents that comprise the complete protest package must be received, and time stamped at the Sourcewell office by 4:30 p.m., Central Time, no later than 10 calendar days following Sourcewell’s notice of master agreement award(s) or non- award. A protest must allege a procedural, technical, or legal defect, with supporting documentation. A protest that merely requests a re-evaluation of a proposal’s content will not be entertained.

A protest must include the following items:
x The name, address, and telephone number of the protester; x Identification of the solicitation by RFP number;
x A precise statement of the relevant facts;
x Identification of the alleged procedural, technical, or legal defect; x Analysis of the basis for the protest;
x Any additional supporting documentation;
x The original signature of the protester or its representative; and x Protest bond in the amount of $20,000 (except where prohibited by law or treaty).

Protests that do not address these elements will not be reviewed.

D. RIGHTS RESERVED

This RFP does not commit Sourcewell to award any master agreement, and a proposal may be rejected if it is nonresponsive, conditional, incomplete, conflicting, or misleading. Proposals that contain false statements or do not support an attribute or condition stated by the proposer may be rejected.

Sourcewell reserves the right to:
x Modify or cancel this RFP at any time;
x Reject any and all proposals received;
x Reject proposals that do not comply with the provisions of this RFP; x Select, for master agreements or for discussion, a proposal other than that with the lowest cost;
x Independently verify any information provided in a proposal; x Disqualify any proposer that does not meet the requirements of this RFP, is debarred or suspended by the United States or Canada, State of Minnesota, Participating Entity’s state or province; has an officer, or other key personnel, who have been charged with a serious crime; or is bankrupt, insolvent, or where bankruptcy or insolvency are a reasonable prospect;

Page 148 of 1283 ends

Rev. 6/2024 Sourcewell RFP #041525
Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Page 14 ends

x Waive or modify any informalities, irregularities, or inconsistencies in the proposals received;
x Clarify any part of a proposal and discuss any aspect of the proposal with any proposer; and negotiate with more than one proposer;
x Award a master agreement if only one responsive proposal is received if it is in the best interest of Participating Entities; and
x Award a master agreement to one or more proposers if it is in the best interest of Participating Entities.

E. DISPOSITION OF PROPOSALS

All materials submitted in response to this RFP will become property of Sourcewell and will become public record in accordance with Minnesota Statutes Section 13.591, after negotiations are complete. Sourcewell considers that negotiations are complete upon execution of a resulting master agreement. It is the proposer’s responsibility to clearly identify any data submitted that it considers to be protected. Proposer must also include a justification for the classification citing the applicable Minnesota law. Sourcewell may reject proposals that are marked confidential or nonpublic, either substantially or in their entirety.

Sourcewell will not consider the prices submitted by the proposer to be confidential, proprietary, or trade secret materials. Financial information, including financial statements, provided by a proposer is not considered trade secret under the statutory definition.

Page 149 of 1283 ends

03/12/2025
Addendum No.1
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

I would to access the past wining bid documents on the same [sic]. How and when can I have it?

Answer 1:

This is a new solicitation category for Sourcewell, therefore, there is no historical data or past documentation to provide.

End of Addendum
Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 03/12/2025, is required at the time of proposal submittal.

Page 150 of 1283 ends

03/18/2025
Addendum No.2
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

When and how will questions be answered? Will they all be answered on April 7, or will they be answered as they are received? Will all questions be publicly posted or will we only receive a response to our specific questions?

Answer 1:

Questions submitted through the Sourcewell Procurement Portal are usually answered within 1 – 2 business days. Addenda are sent to all registered plan takers. Proposers can submit questions through the portal until the question deadline outlined in the RFP.

Proposers can also ask questions during the pre-proposal conference. Proposers who ask questions already answered in the FAQ (posted to the “Resource Materials” section of the portal homepage), will be referred to the FAQ for their answer.

All proposers are encouraged to read the FAQ, the RFP, the Master Agreement, and all Addenda related to the RFP prior to submitting a question.

End of Addendum

Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 03/18/2025, is required at the time of proposal submittal.

Page 151 of 1283 ends

03/25/2025
Addendum No.3
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

How will Sourcewell evaluate percentage discounts versus line-item pricing?

Answer 1:

In the competitive process, Sourcewell will not advise a proposer on the content of the proposal. Each proposer, in its discretion, will determine and articulate the pricing approach that aligns with its business methods and satisfies all the requirements of the RFP. All proposed pricing must be clearly understandable, complete, and fully describe the total cost of acquisition.

Proposal evaluations will be based on scoring criteria identified in the RFP, the expectations and requirements of the individual scoring attribute (e.g., Pricing) as described in the RFP, and the Sourcewell Evaluator Scoring Guide available on the homepage under the “Resource Materials” section of the Sourcewell Procurement Portal. A proposal is not scored in direct comparison to the other proposals. Sourcewell does not use a standardized cut-score when making an award(s).

Question 2:

Will lower prices automatically receive higher scores, or is the value (price vs. features) also considered?

Page 152 of 1283 ends

Answer 2:

Refer to answer 1.

End of Addendum
Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 03/25/2025, is required at the time of proposal submittal.

Page 153 of 1283 ends

03/26/2025
Addendum No.4
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

If we intend on participating in Canada only, can we provide pricing in U.S. dollars only?

Answer 1:

Refer to RFP Section III. A. 3., “All proposed pricing must be: Stated in U.S. and Canadian dollars (as applicable).” If a proposer intends to offer its solutions to Sourcewell’s Canadian participating entities it must identify its Canadian pricing.

End of Addendum
Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 03/26/2025, is required at the time of proposal submittal.

Page 154 of 1283 ends

03/27/2025
Addendum No.5
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

May we upload a small video file in the Documents upload section? The video will demonstrate function of a product. If so, which format is preferred (mp4, .mov, etc.)?

Answer 1:

Document uploads are allowed in Step 2 of the proposal preparation process. Refer to the instructions above the file upload tool in Step 2 for additional guidance:
“Documents in PDF format are preferred. Documents in Word, Excel, or compatible formats may also be provided.”
“If you need to upload more than one (1) document for a single item, you should combine the documents into one zipped file.”
“Maximum file upload size is 500MB.”

End of Addendum
Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 03/27/2025, is required at the time of proposal submittal.

Page 155 of 1283 ends

04/01/2025
Addendum No.6
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

I. Scope and Requirements Clarification
Specific Solutions:

RFP Section II.B mentions 'Vehicle-to-Everything (V2X) capabilities' as optional.

Can you provide more detail on the specific V2X functionalities that Participating Entities are most interested in (e.g., traffic signal coordination, emergency vehicle prioritization, data sharing with autonomous vehicles)?

Answer 1:

Sourcewell utilizes a competitive, solutions-based solicitation approach that is not based on detailed specifications, finite quantities or locations. Any of Sourcewell's participating entities could use the contract, if applicable.

Sourcewell is requesting proposals to meet the various needs of its 50,000+ Participating Entities as a whole, across the United States and Canada, NOT individual entities’ needs. The use of Sourcewell contracts is voluntary for Participating Entities. In this competitive solicitation process, Sourcewell will not advise a proposer on the way it should submit a proposal. It is left to the discretion of each proposer to articulate and propose the approach that aligns with its business methods and satisfies the requirements of the RFP. Participating Entities’ unique needs, and Solutions from awarded supplier(s), will be determined if and when Participating Entities choose to utilize a contract resulting from this solicitation.

Page 156 of 1283 ends

Question 2:

In Section II.B, regarding software development:

Can you elaborate on what constitutes a 'supplemental service'? Please provide examples of software development that would be considered within the scope of 'supplemental' and examples of software development that would be considered outside the scope.

Answer 2:

In this competitive solicitation process, Sourcewell will not advise a proposer on the way it should submit a proposal. It is left to the discretion of each proposer to articulate and propose the approach that aligns with its business methods and satisfies the requirements of the RFP.

Question 3:

RFP Section II.B lists several excluded categories.

Can you provide specific examples of how solutions 1-4 might 'complement and directly relate' to the excluded categories, particularly concerning:

Parking Management Systems (RFP #080321)
Public Safety Video Surveillance Solutions (RFP #101223) Public Safety Communications Technology and Hardware Solutions (RFP #020625) Fleet Management Technologies (RFP #102924)
Electric Vehicle Supply Equipment (RFP #021825)

For each of the above, please provide examples of solutions that would be considered within this RFP and solutions that would be considered excluded?

Answer 3:

Proposers should review all exclusions listed within the RFP by visiting sourcewell- mn.gov, searching for the RFP six-digit number, and reviewing the requested equipment, products, or services of the RFP document. If a proposer includes excluded products or services in their proposal, those products and services will be excluded from the Master Agreement.

Question 4:

RFP Section II.B indicates that 'Generally, the solutions for Participating Entities are turn- key solutions. Can you provide examples of scenarios where 'equipment-only or

Page 157 of 1283 ends

products-only' solutions would be appropriate?

Answer 4:

Refer to answer 1.

Question 5:

Compatibility and Integration:

To what extent should proposed solutions integrate with existing smart city platforms or data management systems that Participating Entities may already have?

Are there specific platforms or systems that proposers should consider for compatibility?

Are there specific data formats or communication protocols that proposed solutions should adhere to ensure interoperability?

Answer 5:

Refer to answer 1.

Question 6:

Technical Specifications:

Section II.C.1 states that all items must comply with 'current applicable safety or regulatory standards or codes.

Can you provide a list of the specific standards or codes that are most relevant to this RFP, particularly for:

Outdoor sensors
Network components
Installation services
For outdoor sensors (Section II.B.1):

Answer 6:

Each proposer is solely responsible for knowing and applying all applicable industry safety codes and regulations that pertain to their proposed solution.

Page 158 of 1283 ends

Question 7:

Are there specific requirements for durability, environmental resilience (e.g., temperature range, weatherproofing, IP rating)?

Answer 7:

Refer to answer 1.

Question 8:

Are there specific requirements for accuracy and calibration standards?

Answer 8:

Refer to answer 1.

Question 9:

Are there any preferences for sensor types (e.g., wireless vs. wired, specific communication protocols)?

Answer 9:

Refer to answer 1.

Question 10:

II. Pricing and Contractual Terms
Pricing Structure:

Section III.A requires proposers to provide either line-item pricing or a percentage discount from catalog pricing.

Is there a preference for one method over the other?

Are there scenarios where a combination of both methods is recommended?

If providing percentage discounts, what level of detail is expected for the 'current published MSRP' documentation?

Page 159 of 1283 ends

Answer 10:

Each proposer, in its discretion, will determine and articulate the pricing approach that aligns with its business methods and satisfies all the requirements of the Pricing section of the RFP. Proposals are evaluated based on the criteria stated in the RFP.

Question 11:

Regarding administrative fees (Section III.B):

Is there any flexibility in the percentage for specific solution types or contract volumes? Are there any examples of categories where a flat fee might be considered acceptable?

Answer 11:

Refer to the Administrative Fees section of the RFP. For directions on proposing an administrative fee. It is left to the discretion of each proposer to determine and propose an administrative fee that is consistent with its business practices and industry.

Question 12:

Contractual Terms:

In the Master Agreement template (referenced in Section IV):

Are there specific areas where Sourcewell is less likely to accept modifications, beyond those related to Minnesota legal requirements?

For example, are there clauses related to liability, indemnification, or termination that are considered non-negotiable?

If a proposer proposes a modification to the Master Agreement and it is not accepted by Sourcewell, will that automatically disqualify the proposal, or will the proposer have an opportunity to agree to Sourcewell's terms?

Answer 12:

To request a modification to the Master Agreement, terms, conditions, or specifications, a Proposer may complete and submit the Exceptions to Terms, Conditions, or Specifications Form, which is found as the final Table of Step 1 – Specifications in the proposal submission process. If selecting “Yes”, the Proposer MUST download the Master Agreement from the “Documents” section of the “Bid Details” page. The Master Agreement is pre-set to track changes (e.g. requests). The Master Agreement MUST be

Page 160 of 1283 ends

uploaded in Word format. This is the ONLY time to request modifications. Requested modifications are reviewed and are NOT automatically approved.

If selected for award, Sourcewell will negotiate with the proposer regarding its requested exceptions and modifications. Requesting modifications will not disqualify a proposer from receiving an award.

Question 13:

III. Evaluation and Process
Evaluation Criteria:

Can you provide more detail on what constitutes 'Value Added Attributes' in the evaluation criteria (Section VI.B)?

Please provide examples of what proposers might include to demonstrate 'Value Added Attributes.'

For instance, are environmental sustainability features, innovative technologies, or unique service offerings considered 'Value Added Attributes'?

Answer 13:

Refer to the Specification table(s) (questionnaire) located in the Sourcewell Procurement Portal.

Question 14:

How does Sourcewell define 'Financial Viability and Marketplace Success' (Section VI.B), and what specific documentation is preferred to demonstrate this?

Examples: financial statements, credit ratings, market share data, client testimonials, etc.

Answer 14:

Refer to the Specification table(s) (questionnaire) located in the Sourcewell Procurement Portal. References and examples of financial documentation has been discussed in the pre-proposal conference. A copy of the pre-proposal recording is provided in the “Documents” section of the “Bid Details” page on the portal.

Page 161 of 1283 ends

Question 15:

In Section VI.A, it states that Sourcewell will award master agreements to proposers offering the 'best overall quality, selection...and price.'

Can you provide more detail on the relative importance of 'quality,' 'selection,' and 'price' in the evaluation process?

Answer 15:

Refer to VI. Evaluation and Award, section B of the RFP.

Question 16:

Proposal Process:

Section V.D states that 'It is recommended that proposers allow sufficient time to upload the proposal...'
Can you provide an estimate of how much time should be allocated, considering potential portal traffic or technical issues, especially on the due date?

Answer 16:

It is the responsibility of the proposer to ensure their submission is complete and submitted prior to the due date and time listed in the RFP.

Question 17:

If an addendum is issued very close to the proposal due date, will Sourcewell consider extending the deadline to allow proposers adequate time to adjust their submissions?

Answer 17:

Pending the volume of questions submitted at the question deadline, Sourcewell intends to answer all questions by the next business day.

Refer to answer 18 regarding extensions.

Question 18:

What is the process for requesting a deadline extension in such a case?

Page 162 of 1283 ends

Answer 18:

With the availability of the Sourcewell Procurement Portal allowing for 24/7 remote access, extensions are not typically approved or deemed necessary.

Question 19:

Is there any specific format for the RFP response?

Answer 19:

The only acceptable proposal format is the Sourcewell Procurement Portal and the Specification tables (questionnaire) contained therein. Proposers should submit relevant information through the portal no later than the date and time specified in the solicitation scheduled.

Question 20:

Do you need past performance reference? If yes how many.

Answer 20:

Refer to answer 2.

End of Addendum
Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 04/01/2025, is required at the time of proposal submittal.

Page 163 of 1283 ends

04/04/2025
Addendum No.7
Solicitation Number: RFP 041525
Solicitation Name: Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services

Consider the following Question(s) and Answer(s) to be part of the above-titled solicitation documents. The remainder of the documents remain unchanged.

Question 1:

Our solution is based on a software platform used in many cities in Europe to collect data and display them in a unified control center (Energy management, CCTV, access control) Is this Tender include also such software solution or just hardware?

Answer 1:

Sourcewell will not pre-qualify any products or services. Only those products within the scope of the RFP will be included in any agreement awarded by Sourcewell as a result of the solicitation. It is left to the discretion of each Proposer to determine if its products or services meet the scope of Requested Equipment, Products, or Services.

End of Addendum
Acknowledgement of this Addendum to RFP 041525, posted to the Sourcewell Procurement Portal on 04/04/2025, is required at the time of proposal submittal.

Page 164 of 1283 ends

Proposal Opening Record

Date of opening: April 15, 2025

Sourcewell, a State of Minnesota local government unit and service cooperative, is requesting proposals for Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services to result in a procurement solution for use by its Participating Entities. Sourcewell Participating Entities include thousands of governmental, higher education, K-12 education, nonprofit, tribal government, and other public agencies located in the United States and Canada. A full copy of the Request for Proposals can be found on the Sourcewell Procurement Portal [https://proportal.sourcewell-mn.gov]. Only proposals submitted through the Sourcewell Procurement Portal will be considered. Proposals are due no later than April 15, 2025, at 4:30 p.m. Central Time, and late proposals will not be considered.

The undersigned certify that all responses received on Request for Proposal #041525 were submitted through the Sourcewell Procurement Portal, and that each Proposer’s response material was digitally sealed upon submission and remained inaccessible until the due date and time specified in the Solicitation Schedule.

Responses were received from the following:

ATS Traffic - Submitted Tue Apr 15, 2025 1:37:29 PM
BusPatrol America, LLC - Submitted Tue Apr 15, 2025 3:49:46 PM Clovity, Inc. - Submitted Tue Apr 15, 2025 10:13:22 AM
Cooper Lighting, LLC - Submitted Mon Apr 14, 2025 9:14:41 PM Dimonoff - Submitted Thu Apr 10, 2025 2:51:35 PM
EVready LLC - Submitted Mon Apr 14, 2025 5:46:14 PM
FERROVIAL ENERGY SOLUTIONS, LLC - Submitted Tue Apr 15, 2025 9:09:43 AM Fonroche Lighting America - Submitted Tue Apr 15, 2025 11:06:31 AM Itron, Inc. - Submitted Tue Apr 15, 2025 1:54:57 PM
ITS Plus, Inc. - Submitted Fri Apr 11, 2025 2:34:13 PM
Karror, LLC - Submitted Wed Apr 9, 2025 10:38:14 PM
Municipal Parking Services - Submitted Tue Apr 15, 2025 8:23:42 AM NTT America, Inc. - Submitted Tue Apr 15, 2025 1:35:36 PM nureal.ai - Submitted Mon Apr 14, 2025 1:48:57 PM
Outdoorlink, Inc. - Submitted Tue Apr 15, 2025 3:20:22 PM Pi Variables, Inc. - Submitted Sun Apr 13, 2025 7:53:35 PM Senzary, LLC - Submitted Tue Apr 15, 2025 4:28:04 PM
Signify North America Corporation - Submitted Tue Apr 15, 2025 12:17:53 PM Tagmarshal, Inc. - Submitted Tue Apr 15, 2025 2:22:16 PM TALOSYS, Inc. - Submitted Tue Apr 15, 2025 2:36:30 PM







 




Page 165 of 1283 ends

Teckra, Inc. - Submitted Tue Apr 15, 2025 1:11:56 PM
Ubicquia, Inc. - Submitted Tue Apr 15, 2025 3:42:19 PM

The Proposals were opened electronically, and a list of all Proposers was made publicly available in the Sourcewell Procurement Portal, on April 15, 2025, at 4:30 pm CT. All responsive proposals were then submitted for review by the Sourcewell Evaluation Committee.

_____________________________________ ___________________________________ Lisa Truax, CPPB, Senior Procurement Analyst Jonathan Love, MA, Procurement Analyst II








 




Page 166 of 1283 ends

Smart Infrastructure Solutions, Outdoor Sensors, and Related Products and Services #041525 ATS Traffic
BusPatrol
America, LLC Clovity, Inc.

Cooper
Lighting, LLC Dimonoff EVready, LLC
Ferrovial
Energy
Solutions, LLC
Fonroche
Lighting
America Itron, Inc. ITS Plus, Inc. Karror, LLC
Possible
Points
Conformance to RFP Requirements Pass/Fail Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Financial Viability and Marketplace
Success 50 37 33 35 43 39 36 40 43 43 38 31 Ability to Sell and Deliver Solutions 150 105 105 102 101 108 114 100 108 96 100 96 Marketing Plan 100 83 80 84 78 79 79 70 77 70 65 78 Value Added Attributes 100 75 75 78 74 73 79 76 74 64 69 86 Depth and Breadth of Offered
Solutions 200 176 130 162 173 154 159 149 149 127 135 132 Pricing 400 323 292 295 338 297 330 279 303 315 349 291 Total Points 1,000 799 715 756 807 750 797 714 754 715 756 714 Rank Order 3 17.5 11.5 2 14 4 19.5 13 17.5 11.5 19.5

Municipal
Parking
Services
NTT America,
Inc. nureal.ai
Outdoorlink,
Inc.

Pi Variables,
Inc. Senzary, LLC
Signify North
America
Corporation
Tagmarshal,
Inc. TALOSYS, Inc. Teckra, Inc. Ubicquia, Inc.

Possible
Points
Conformance to RFP Requirements Pass/Fail Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Financial Viability and Marketplace
Success 50 34 39 33 35 38 35 42 37 32 34 Ability to Sell and Deliver Solutions 150 106 105 105 107 110 98 101 115 92 92 Marketing Plan 100 68 71 74 78 80 83 72 84 69 54 Value Added Attributes 100 72 75 73 76 79 78 80 84 64 62 Depth and Breadth of Offered
Solutions 200 151 149 165 139 133 168 168 172 144 144 Pricing 400 302 323 327 322 328 320 297 321 330 270 Total Points 1,000 733 762 777 757 768 782 760 813 731 656 R a n k O r d e r 1 586 1 0759 1 1 6 2 1
Lisa Truax, CPPB Paul Dotson, MA Brittney Cotner Jonathan Love, MA Senior Procurement Analyst Procurement Analyst II Procurement Analyst Procurement Analyst II Proposal Evaluation







 



Page 167 of 1283 ends

38077.00180\34047676.2 C2

EXHIBIT “D”

INSURANCE REQUIREMENTS

Please refer to the insurance requirements listed below. Those that have an “X” indicated in the space before the requirement apply to Contractor’s or Consultant’s Agreement.

Contractor or Consultant shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Contractor or Consultant, its agents, representatives, employees or subcontractors.

Contractor or Consultant shall provide its insurance broker(s)/agent(s) with a copy of these requirements and request that they provide Certificates of Insurance complete with copies of all required endorsements.

Contractor or Consultant shall furnish City with copies of original endorsements affecting coverage required by this Exhibit D. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements and certificates are to be received and approved by City before work commences. City has the right to require Contractor’s or Consultant’s insurer to provide complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications.

Commercial General Liability (CGL):

___ Coverage at least as broad as Insurance Services Office (“ISO”) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury with limits no less than $2,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

_x__ Coverage at least as broad as ISO Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury with limits no less than $1,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

___ Coverage at least as broad as ISO Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury with limits no less than $5,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

Automobile Liability:

_x__ Coverage at least as broad as ISO Form Number CA 0001 covering, Code 1 (any auto), of if Contractor or Consultant has no owned autos, Code 8 (hired) and 9 (non-owned), with limits no less than $1,000,000.00 combined single limit for bodily injury and property damage.

___ Coverage at least as broad as ISO Form Number CA 0001 covering, Code 1 (any auto), with limits no less than $5,000,000.00 combined single limit for bodily injury and property damage.

Page 168 of 1283 ends

38077.00180\34047676.2 C2

___ Garage keepers’ extra liability endorsement to extend coverage to all vehicles in the care, custody and control of the Contractor or Consultant, regardless of where the vehicles are kept or driven.

Professional Liability (Errors and Omissions):

_x__ Insurance appropriates to the Contractor or Consultant’s profession, with limit no less than $1,000,000.00 per occurrence or claim, $2,000,000.00 aggregate.

___ (If Design/Build), with limits no less than $1,000,000.00 per occurrence or claim, and $2,000,000.00 policy aggregate.

___ Insurance appropriates to the Contractor or Consultant’s profession, with limit no less than ______ per occurrence or claim, ______ aggregate

Workers’ Compensation Insurance:

__x_ Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000.00 per accident for bodily injury or disease. (Not required if Contractor or Consultant provides written verification it has no employees)

The Employer’s Liability policy shall be endorsed to waive any right of subrogation as respects the City, its elected and appointed officials, officers, attorneys, agents, and employees.

Builder’s Risk (Course of Construction):

___ Insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions. If the project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment.

The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site.

Contractor’s or Consultant’s Pollution Legal Liability:

___ Contractor’s or Consultant’s pollution legal liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000.00 per occurrence or claim and $2,000,000.00 policy aggregate.

If the Contractor or Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor or Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.

Cyber Liability Insurance

___ Cyber Liability Insurance with limits not less than $1,000,000 per claim.

Page 169 of 1283 ends

38077.00180\34047676.2 C2

Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Contractor or Consultant in this Agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion, and network security.

The policy shall provide coverage for breach response costs as well as regulatory fines and penalties, and credit monitoring expenses with limits sufficient to respond to these obligations.

Surety Bonds:

Contractor shall provide the following Surety Bonds:

____ Bid Bond
__x__ Performance Bond
__x__ Payment Bond

The Payment Bond and Performance Bond shall be in a sum equal to the contract price. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.

Other Insurance Provisions:

The insurance policies are to contain, or be endorsed to contain the following provisions:

_x__ Additional Insured Status and Primary/Non-Contributory Language:

Contractor’s general liability and automobile liability policies shall be primary and shall not seek contribution from the City’s coverage and be endorsed to add the City and its elected and appointed officials, officers, attorneys, agents employees and volunteers as additional insureds under such policies using Insurance Services Office form CG 20 10 (or equivalent) on the general liability policy. For construction projects, an endorsement providing completed operations coverage for the additional insured on the general liability policy, ISO form CG 20 37 (or equivalent), is also required.

The limits of insurance required in this Agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City (if agreed to in a written contract or agreement) before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.

___ Loss Payee Status – Builder’s Risk/Course of Construction Insurance (applicable to Construction Contracts only)

Contractor or Consultant may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear.

_x__ Notice of Cancellation, Suspension or Otherwise Voiding Policies:

Each insurance policy required above shall contain or be endorsed to contain that coverage shall not be suspended, voided, canceled or reduced in coverage or in limits except with thirty (30) days’ prior written notice by certified mail, return receipt requested to the City.

Page 170 of 1283 ends

38077.00180\34047676.2 C2

_x__ Waiver of Subrogation:

Contractor or Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Contractor or Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Contractor or Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation Policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by Contractor or Consultant, its employees, agents and subcontractors.

___ Completed Operations

For Construction Agreements, Contractor shall maintain insurance as required by this Agreement to the fullest amount allowed by law and shall maintain insurance for a minimum of five (5) years following the completion of this project. In the event Contractor fails to obtain or maintain completed operations coverage as required by this Agreement, the City at its sole discretion may purchase the coverage required and the cost will be paid by Contractor.

THE FOLLOWING PROVISIONS APPLY TO ALL AGREEMENTS

Deductibles and Self-Insured Retentions (“SIR”):

Any deductibles or self-insured retentions must be declared to and approved by City. The City may require the Contractor or Consultant to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. At the option of the City, either (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its elected and appointed officials, officers, attorneys, agents, and employees; or (2) the Contractor or Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.

All SIRs must be disclosed to Risk Management for approval and shall not reduce the limits of liability.

Policies containing any SIR provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named insured or the City.

City reserves the right to obtain a full-certified copy of any insurance policy and endorsements. Failure to exercise this right shall not constitute a waiver of right to exercise later.

Acceptability of Insurers:

Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A-:VII, unless otherwise acceptable to City.

Claims Made Policies:

1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.

Page 171 of 1283 ends

38077.00180\34047676.2 C2

2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Contractor or Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

4. A copy of the claims reporting requirements must be submitted to the City for review.

5. If the services involve lead-based paint or asbestos identification/remediation, the Contractor’s Pollution Liability Policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability Policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.

Subcontractors:

Contractor or Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors.

Subcontractor agrees to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under this Agreement and any other contract documents. Subcontractor further agrees to include the same requirements and provisions of this Agreement, including the indemnity and insurance requirements, with any sub-subcontractor to the extent they apply to the scope of the sub- subcontractor’s work. A copy of the City indemnity and insurance provisions will be furnished to the subcontractor upon request.

Verification of Coverage:

Contractor or Consultant shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor or Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Special Risks or Circumstances

City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage or other special circumstances.

Failure to Comply:

Each insurance policy required above shall contain or be endorsed to contain that any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected and appointed officials, officers, attorneys, agents, and employees.

Applicability of Coverage:

Page 172 of 1283 ends

38077.00180\34047676.2 C2

Each insurance policy required above shall contain or be endorsed to contain that the Contractor’s or Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.

Page 173 of 1283 ends

Attachment C
Construction Change Order Policy for the Hammond Way Streetlight Project, CIP No. 4301

2021 City Council Approved Construction Change Order Policy

Construction Award Individual Administrative Cumulative Award Amount Change Order Authority Change Order Authority Less than $100,000 $10,000 $15,000
Over $100,000 10% of Award or $20,000 15% of Award or $40,000 whichever is less whichever is smaller

Hammond Way Streetlight Project, CIP No. 4301

Construction Award Individual Administrative Cumulative Award Amount Change Order Authority Change Order Authority $100,712 N/A $25,000

Page 174 of 1283 ends

CITY OF MILPITAS

AGENDA REPORT
(AR)

Item Title: Consider Fee Waiver Request from Kiwanis Club of Milpitas for the 22nd Annual Crab Feed (Staff Contact: Renee Lorentzen, Recreation and Community Services Director, 408-586-3409)
Category: Consent Calendar-Community Services and Sustainable Infrastructure

Meeting Date: 12/2/2025
Recommendation: Approve a Fee Waiver of $763 for the 22nd Annual Kiwanis MUSD Crab Feed and Auction at the Milpitas Community Center Auditorium on February 6, 2026.

BACKGROUND:

On November 6, 2025, staff received a Donation and Fee Waiver/Reduction Policy request from the Kiwanis Club of Milpitas Foundation for their 22nd Annual Crab Feed and Auction at the Milpitas Community Center Auditorium. The request is for a $763 fee waiver for the hourly rental rates of the auditorium.

ANALYSIS:

One Donation and Fee Waiver/Reduction Policy request application was received by the Recreation and Community Services Department for a fee waiver for Kiwanis Club of Milpitas Foundation.

Fee Waiver Request
Kiwanis Club of Milpitas Foundation submitted the required application and documentation for their annual Crab Feed and Auction:

- Facility Rental Application and Permit
- City Council Donation and Fee Waiver/Reduction Policy request - Non-profit status letter

Kiwanis Club of Milpitas Foundation is requesting the City Council waive eligible fees for facility rental hourly fees in the amount of $763. Fees ineligible for waiver are the application fee, refundable rental security/damage deposits, and staff fees.

Milpitas City Council adopted an updated City Council Donation and Fee Waiver/Reduction Policy (Policy) on June 21, 2022. Per the Policy, eligible organizations can request City fees to be waived up to $1,500 or a donation amount up to $500 to be granted upon request. Eligible organizations are defined as “a non-profit organization as described by the Internal Revenue Section such as 501(c)(3) or an intergovernmental agency; Non-discriminatory, and non-political in nature.” Fee Waiver or Donation requests for events must provide a community benefit within the City of Milpitas proper. Applying organizations must provide proof of non-profit status from the federal Internal Revenue Service or the state Franchise Tax Board.

As required, Kiwanis Club of Milpitas Foundation provided a copy of their determination letter from the Internal Revenue Service stating they are a tax-exempt organization. The applicant meets the requirements as outlined in the Council adopted Donation and Fee Waiver/Reduction Policy.

POLICY ALTERNATIVE(S):

Alternative: Do not approve any one or combination of received fee waivers and donation applications as requested.

Pros: The City’s General Fund will not incur the costs of the fees waived.

Con: Denial of the request may not allow the non-profit organization to hold their events.

Page 175 of 1283 ends

Reason not recommended: This request is consistent with the Council approved Policy.

FISCAL IMPACT:
$25,000 was approved and included in the FY 2025-26 City budget for City Council’s Unallocated Community Promotions with a current balance of $22,044 If this request is approved by the City Council, then $21,281 would remain in that line item of the current year’s budget.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):

The action has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment and is not a project pursuant to Pub. Resources Code, § 21065 and Cal. Code Regs., tit. 14, § 15378. Even if a project, the action is exempt from further CEQA review pursuant to Cal. Code Regs., tit. 14, § 15061(b)(3) as it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.

ATTACHMENT(S):
(a) Kiwanis Club of Milpitas Foundation Application
(b) Kiwanis Club of Milpitas Foundation Internal Revenue Service (IRS) non-profit letter

Page 176 of 1283 ends
Page 177 of 1283 ends
Page 178 of 1283 ends
Page 179 of 1283 ends

CITY OF MILPITAS

AGENDA REPORT
(AR)

Item Title: Approve the Parks and Recreation and Community Services Programs Donation for a Memorial Bench in Honor of Segundo Cacao (Staff Contact: Renée Lorentzen, Recreation and Community Services Director, 408-586-3409) Category: Consent Calendar-Community Services and Sustainable Infrastructure

Meeting Date: 12/2/2025
Recommendation: Approve the Parks and Recreation Donation for a Memorial Bench for Segundo Cacao at Strickroth Park.

BACKGROUND:

Milpitas City Council adopted revisions to the Donation for City Park and Recreation and Community Services Programs City Council Policy (Policy) on October 4, 2022. The Policy establishes guidelines, criteria, and processes for donations for City parks and Recreation and Community Services Department programs, including memorials to City-owned parks and recreation areas throughout the City of Milpitas. This Policy is consistent with the Council approved Budget Guidelines to provide process and procedure on the acceptance of financial donations.

On November 3, 2025, the Parks, Recreation and Cultural Resources Commission (PRCRC) voted to recommend City Council approval of the Parks and Recreation Donation Application submitted by Edgar Cacao for the installation of a Memorial Bench at Strickroth Park for Segundo Cacao.

ANALYSIS:

The Policy outlines ways for businesses, community groups, or individuals to donate through:
1) Monetary Donations
2) Memorial Donations
3) Anonymous Donations
4) Non-Financial Donations

Donations that require ongoing maintenance and/or future replacement costs are first reviewed by the PRCRC for review and recommendation to the Milpitas City Council for final consideration.

As described in the donation application, Segundo Cacao was a veteran, long-time resident (1972) and a very active and dedicated member of the Filipino American Association of Milpitas Inc., supporting numerous Filipino cultural celebrations in Milpitas. After retiring from the United States Navy, he became a realtor which he enjoyed for over 30 years. Mr. Cacao passed away on October 24, 2025.

As outlined in the Policy “Memorial Donations” sections 2.6.3.1 and 2.6.3.4 respectively:
- Memorial Donations allow for individuals to contribute funds “in memory of” a family member who has passed away or retired and moved out of the area.

- Donation in memory of an individual must be appropriate and relevant to the Milpitas community, (i.e., past resident, business-person or other person having contributed to the good of the Milpitas community).

The PRCRC unanimously voted in favor of recommending the City Council’s final approval of the memorial bench donation.

Page 180 of 1283 ends

POLICY ALTERNATIVE(S):

Alternative 1: Not approve the donation of a Memorial Bench in Honor of Segundo Cacao Pros: City Staff will not have to work on the Memorial Bench Donation and will continue to work on currently assigned tasks.

Cons: The proposed memorial donation meets the Policy requirements.

Reason for Not Recommending: The proposed memorial donation meets the City Council Donation for City Parks and Recreation and Community Services Programs

FISCAL IMPACT:

Per the Donations to Parks and Recreation Programs Policy the Cacao family accepts all financial responsibility of the donation which includes the bench and plaque procurement and installation. Ongoing maintenance costs and future replacement costs will be incorporated into a future Public Works operating budget.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):

The action has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment and is not a project pursuant to Pub. Resources Code, § 21065 and Cal. Code Regs., tit. 14, § 15378. Even if a project, the action is exempt from further CEQA review pursuant to Cal. Code Regs., tit. 14, § 15061(b)(3) as it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.

ATTACHMENT(S):
(a) Donation for City Parks and Recreation and Community Services Programs Policy (b) Parks, Recreation and Cultural Resources Financial Donation Form

Page 181 of 1283 ends

CITY OF MILPITAS
Revision Date
Original 03/19/2013
Revised 10/4/2022

CITY COUNCIL POLICY

Page 1 of 3 ends

1. PURPOSE

1.1. This Policy establishes the guidelines, criteria, and processes for donations for City parks and Recreation and Community Services Department programs.

1.2. This Policy is consistent with the Council approved Budget Guidelines which state in part that the City Manager is authorized to accept grants or donations up to and including $100,000, increase department revenues and appropriations accordingly, and execute related agreements as long as no matching funds are required, and departments do not require additional funding for ongoing maintenance costs or future replacement costs

2. POLICY

2.1. The City shall have the sole authority and the City Council shall have the final authority to approve donations except for monetary donations up to and including $100,000 that do not require any matching funds, additional funding for ongoing maintenance costs or future replacement costs.

2.2. The City reserves the right to recognize donors, or, for memorial gifts, the named individual, in any other manner the City so chooses. No outside donor shall have the right to apply, control, or dictate the City’s manner of recognition.

2.3. In the event the City chooses to recognize a donor, or for memorial gifts, the named individual, the manner of recognition shall be construed as the City’s own speech under the government speech doctrine and no open forum shall be created by the City’s exercise of its sole decision to recognize a donor or named individual at a certain location or in a certain manner.

2.4. Final review and action to accept or decline a donation, and recognition of the donor for accepted donations on behalf of the City of Milpitas is determined by the Milpitas City Council except for monetary donations up to and including $100,000 that do not require any matching funds, additional funding for ongoing maintenance costs or future replacement costs. For these monetary donations, the final review and action rests with the City Manager.

2.5. The Parks, Recreation and Cultural Resources Commission (PRCRC) shall evaluate appropriate donations to City Parks or Recreation and Community Services programs and shall make recommendations to the City Council.

2.6. Financial Donations

2.6.1. Donors may earmark monies for the purchase of specific materials, supplies, equipment, furnishings, and other items to the extent practical.

Policy No:

Click or tap here to enter
text.

DONATIONS FOR CITY PARKS AND

RECREATION AND COMMUNITY

SERVICES PROGRAMS
Effective Date:
10/4/2022
Revision No:
1 Policy Administrator:

Recreation and Community Services
Next Review Due:

As needed
Related Policies and
Procedures:

Incorporates and
replaces Original
Approved by:

Click or tap here to enter text.

Council meeting date, agenda item #, and
vote

Date Approved:
10/4/2022

Page 182 of 1283 ends

CITY OF MILPITAS
Revision Date
Original 03/19/2013

DONATION FOR CITY PARKS AND RECREATION AND COMMUNITY SERVICES PROGRAMS/ POLICY #

Page 2 of 3 ends

2.6.2. City staff will apply the funds as requested by the donor. Should additional or alternate uses for the funds be identified, staff will consult with the donor and receive written permission to apply funds differently.

2.6.3. Memorial Donations

2.6.3.1 Memorial Donations allow for individuals to contribute funds “in memory of” a family member who has passed away or retired and moved out of the area.

2.6.3.2 Memorial donations may not be contributed in memory of pets, or livestock.

2.6.3.3 I ndividuals may name the City of Milpitas or Recreation and Community Services as a beneficiary in their wills, trusts, or other estate planning document. The will might stipulate that the funds (or interest from part of an estate) be used to purchase particular items or materials in certain service areas or support certain programs.

2.6.3.4 Donation in memory of an individual must be appropriate and relevant to the Milpitas community, (i.e., past resident, business-person or other person having contributed to the good of the Milpitas community).

2.6.4. Anonymous Donations

2.6.4.1 Donations with the request to remain anonymous will not be acknowledged in any donor listings.

2.6.5. Non-financial Donations

2.6.5.1 In the event a donor desires to give materials, personal property, real property, fixtures and other things, non-monetary in nature, to the City, the proposed gift shall be presented to the Director of Recreation and Community Services in writing.

2.6.5.2 All such non-monetary donations shall be subject to the City Manager or designee’s determination of probable value and viability for acceptance and placement.

2.6.5.3 If determined by staff to be a viable donation, the Parks, Recreation and Cultural Resources Commission shall make a recommendation to the City Council for a final decision, except for monetary donations up to and including $100,000, in which the final review and action rests with the City Manager.

3. PROCEDURE

3.1. Accepting Monetary Donation Requests

3.1.1. All inquiries about monetary donations shall be directed to the Recreation and Community Services Director.

3.1.2. If deemed a viable donation, potential donors shall be provided a copy of the Parks, Recreation and Cultural Resources Donation Form.

3.1.3. Upon receipt of this completed form by the Director, the proposed donation shall be placed on the next appropriate PRCRC agenda.

3.1.4. For monetary donations up to and including $100,000 that do not require any matching funds, additional funding for ongoing maintenance costs or future replacement costs, staff will provide an informational item to the PRCRC for information purposes only. The donation will be accepted administratively. The

Page 183 of 1283 ends

CITY OF MILPITAS
Revision Date
Original 03/19/2013

DONATION FOR CITY PARKS AND RECREATION AND COMMUNITY SERVICES PROGRAMS/ POLICY #

Page 3 of 3 ends

Director of Finance will report quarterly the acceptance of any grants and donations as part of the quarterly financial status report.

3.1.5. For any monetary donation, that requires any matching funds, additional funding for ongoing maintenance costs, future replacement costs, or any monetary donation over $100,000, the PRCRC shall review the proposed donations and provide a recommendation for either accepting or declining the donation to the Milpitas City Council.

3.2. Accepting Non-financial Donation Requests

3.2.1. All inquiries about non-financial donations shall be directed to the Recreation and Community Services Director.

3.2.2. Recreation and Community Services Director will coordinate the review of any non-financial donations with other City Departments affected by the donation, including but not limited to the Office of the City Attorney, Finance and Public Works.

3.2.3. If deemed a viable donation, potential donors shall be provided a copy of the Parks, Recreation and Cultural Resources Donation Form.

3.2.4. Upon receipt of this completed form by the Director, the proposed donation shall be accepted by the City Manager or their designee if there are no ongoing maintenance or future replacement costs. Otherwise, the donation shall come to the PRCRC for approval with an estimated value of up to and including $25,000 and to the PRCRC for recommendation for City Council approval with an estimated value greater than $25,000.

3.2.5. The PRCRC shall receive a quarterly report on received non-financial donations received for up to and including $25,000 at a regularly scheduled meeting.

Page 184 of 1283 ends
Page 185 of 1283 ends
Page 186 of 1283 ends

CITY OF MILPITAS

AGENDA REPORT
(AR)

Item Title: Hold a Public Hearing on an Appeal of the Planning Commission’s Decision to Approve Associated Planning Entitlements for a New Industrial Building at 1000 Gibraltar Drive (Staff Contact: Jay Lee, Planning Department, 408-586- 3077)
Category: Public Hearings-Community Development
Meeting Date: 12/2/2025
Recommendation: (1) Conduct a public hearing; (2) Determine that the Addendum to the 1000 Gibraltar Drive Final Environmental Impact Report (State Clearinghouse No. 2020069024) adequately analyzes the potential environmental impacts associated with the Proposed Project, and that the Addendum is in compliance pursuant to CEQA Guidelines §15162 and §15164; and (3) Adopt a Resolution denying the appeal and affirming the Planning Commission’s decision to approve Site Development Permit No. SD24-0006, Environmental Assessment No. EA24-0002, and Tree Removal Permit No. TR25-0021 to remove and replace 25-ordinance sized trees, demolish all existing structures on the site including four industrial/office buildings, surface parking lots, and associated improvements, and develop a new, one-story, 487,564-square foot tilt-up concrete industrial building with office space and associated site improvements on an approximately 28.96-acre site in the M2 (Heavy Industrial) Zoning District located at 1000 Gibraltar Drive (also known as 1001 S. Milpitas Blvd).

BACKGROUND:

The subject property, located at 1000 Gibraltar Drive (also known as 1001 S. Milpitas Blvd.) (APN 086-42-033) encompasses approximately 28.96 acres in the M2 (Heavy Industrial) Zoning District with an MFG (Manufacturing) General Plan Land Use Designation (Project Site). The Project Site is surrounded by other similarly zoned industrial uses with other warehousing and office uses. The site was historically used as a corporate campus with four (4) existing industrial/office buildings, totaling approximately 397,009-square feet with surface parking lots, ancillary structures, and associated landscaping. Lifescan, Inc., a research and development company specializing in medical devices, acquired the site in 1986 and was the longest operator of the site for 29 years until operations ceased in 2015. The City of Milpitas (City) building permit records show minimal and short-term activity with no major long-term tenants on the site between 2015 and ending in late 2017, including minor interior tenant improvements and mechanical/electrical work for two other industrial companies. Overall, the Project Site has been vacant since 2018.

On March 24, 2021, the Planning Commission adopted Resolution No. 21-006 and 21-007, approving a Site Development Permit No. SD19-0008, Tree Removal Permit No. TR19-0007, and Environmental Assessment No. EA20-0004 to remove and replace 88 ordinance-size trees with approximately 215 new trees, demolish existing onsite buildings, surface parking lots, and associated improvements, and construct a new 491,040 square-foot tilt-up concrete industrial building as a warehouse and distribution center with office space, new surface parking lots, and associated site improvements (Previously Approved Project) at the Project Site.

Copies of the Previously Approved Project’s Planning Commission Staff Report and both resolutions are included as Attachment B. The City, as Lead Agency for the environmental assessment, prepared an environmental impact report for the Previously Approved Project in accordance with the California Environmental Quality Act (CEQA), pursuant to Public Resources Code Sections 21080(d) and 21082.2(d) and CEQA Guidelines Section 15064. The Planning Commission certified the 1000 Gibraltar Drive Final Environmental Impact Report (SCH #2020069024) (Attachment C) at the same hearing date per Resolution No. 21-007.

Page 187 of 1283 ends

After the Previously Approved Project’s entitlements were approved, the former applicant (Overton Moore Properties “OMP”), on behalf of the former property owner (CTC Property, LLC), sold the existing entitlements and property to a new property owner, Amazon.com Services, LLC (Amazon). Amazon submitted a time extension request (P-TE22-0003) in May 2022 pursuant to MMC Section XI-10-64.06, Expiration of Permit or Approvals. Subsequently, the Planning Commission approved the time extension request at a public hearing on June 22, 2022, to extend the prior entitlements until March 21, 2024. The aforementioned MMC Section only allows for a one time, time extension request for all approved entitlements. Any entitlements that expire after the extended date and do not vest must re-apply for new entitlements.

The Previously Approved Project application was submitted before the global COVID-19 pandemic, and received approval of its entitlements in the midst of the pandemic during unstable market conditions and at a time when costs to construct and finance the development were at their peak. As a result, the potential development was put on hold until speculative market conditions improved. However, the existing project entitlements expired and the Previously Approved Project was never built. As market conditions began to improve with changing demands over time, Amazon wanted to propose a similar but modified industrial building to still be used as a warehouse and distribution center at the Project Site designed more as a “last mile” facility for one tenant instead of the Previously Approved Project “cross-docking” speculative design for up to two tenants. Amazon contracted with a new applicant team to prepare a revised project proposal modeled after the Previously Approved Project.

In September 2024, Panattoni Development Company (Applicant), on behalf of Amazon, submitted a new application request for Planning Commission approval of Site Development Permit No. SD24-0006, Environmental Assessment No. EA24-0002, and Tree Removal Permit No. TR25-0021 to remove and replace 25-ordinance sized trees, demolish all existing structures on the site including four industrial/office buildings, surface parking lots, and associated improvements and develop a new, one-story, 487,564-square foot tilt-up concrete industrial warehouse building with office space and associated site improvements on the same Project Site (Proposed Project). Proposed site improvements include new internal roadways, landscaping, offsite public improvements, and a new surface parking lot with 781 vehicle parking spaces, 50 oversized parking stalls for tractor-trailers, and 27 loading dock doors. As a Lead Agency, the City prepared an Addendum to the 1000 Gibraltar Drive Final Environmental Impact Report (SCH No. 2020069024) (Addendum) in accordance with the California Environmental Quality Act (CEQA) Guidelines Sections 15162 and 15164.

The Addendum and the MMRP with supporting appendices are included as Attachment D.

Additional details regarding the Proposed Project and staff’s analysis can be found in the Planning Commission staff report dated September 10, 2025, included as Attachment E with Resolution 25-012 and the Project Plans as Attachments F-G.

On September 10, 2025, the Planning Commission (PC) held a public hearing to consider the Proposed Project entitlements. After receiving a presentation from staff, hearing from the Applicant, Property Owner, and the public, the PC closed the public hearing and voted 6-0-1, with one Commissioner absent, to approve the Modified Proposed Project including the Addendum with the adoption of Resolution No. 25-012. The PC meeting minutes for the Proposed Project are included as Attachment H and are summarized below.

• The PC had clarifying questions to City staff, Amazon, and the Applicant regarding truck routes, electric vehicle charging in the parking lot, the type of facility operations as a sub same-day delivery model with on- site goods for rapid delivery and gig-style drivers (Flex program), creation of approximately 363 on-site jobs not including the gig-style drivers, real estate costs and investments, and sales tax. • Two members of the public spoke on behalf of Carpenters Local Union #405, discussing general concerns related to Amazon’s history of the use of non-union contractors and encouraging the Commission to require binding commitments for use of union local labor with living wages, and a request of the Commission to continue the item for additional time to review the Addendum. • Additional clarifying discussion after closing public forum including the CEQA Consultant (First Carbon Solutions) confirming the Proposed Project has no new significant impacts, and that Addendums do not require public circulation per CEQA. Amazon clarified their labor practices, workforce programs, wages, truck and delivery operations. The City Attorney clarified that the Planning Commission’s decision must be based only on the three proposed Planning Entitlements.

Page 188 of 1283 ends

Notably, at no time during the hearing on September 10, 2025, or prior to that point, did anyone submit a comment asserting that the addendum failed to adequately address the stormwater related impacts of the Project, including those stemming from any increase in impervious surface area on the site.

On September 22, 2025, the City Clerk’s Office received a timely-filed appeal pursuant to MMC XI-500-14.00 from the Mitchell M. Tsai Law Firm on behalf of Carpenters Local Union #405 (Appellant), requesting the City Council to reconsider the Planning Commission’s September 10, 2025 decision approving the Proposed Project entitlements. The Appellant provided a letter with the appeal stating the reasons why they believe they should be granted an appeal, attached as Attachment I to the Agenda Report.

The Applicant provided a response letter to the Appellant’s argument for the appeal that includes supporting attachments from the Proposed Project’s CEQA Consultant (First Carbon Solutions) and engineering firm Kier + Wright (Attachment J).

ANALYSIS:

Appeal Letter Summary
The Appellant’s basis for the appeal is that the Addendum to the 1000 Gibraltar Drive Final Environmental Impact Report (SCH #2020069024) is inadequate, that additional environmental review in the form of a subsequent or supplemental EIR should be conducted and that the Notice of Determination should be withdrawn. Table 1 of the Addendum below shows comparisons between the Previously Approved Project and the Proposed Project and was included in the Appellant’s response letter on page 2, which includes the argument that the Proposed Project “seems to be relatively similar to the previously reviewed version except for the dramatic increase in impervious surface area.” The letter does not mention the latest Santa Clara County Urban Runoff Pollution Prevention Program (SCVURPPP) C.3 thresholds. Key points of the letter are summarized below:

1. The Addendum and the previously certified EIR are missing an analysis of flood zone impacts.

2. Concerns that the additional impervious surface area with the Proposed Project already designated as a “moderate“ site combined with a site to the east designated as a significant potential flood site has the potential to result in additional concerns for more flood risk

3. The EIR and EIR Addendum do not adequately discuss the potential flood zone impacts of the subject site being within a FEMA Flood Zone X (Shaded) with an adjacent site as an Zone AO.

Table 1: Comparisons of Previously Approved Project vs. Proposed Project

Existing
Conditions
Previously
Approved
Project Proposed Project
Difference
(Previously
Approved vs.

Proposed)
Number of Buildings 4 1 1 0
Demolition (square feet) n/a 397,009 397,009 0
Total Square Footage 491,040 487,564 -3,476
Warehouse 486,130 square
feet
476,864 square feet -9,266
Office
397,009 square
feet
4,910 square feet 10,700 square feet +5,790
Floor Area Ratio (FAR) 0.31 0.38 0.38 +.01
Impervious Surface Area
(square feet)
876,485 928,755
(additional 52,270)
982,012
(additional 105,527)
+53,257
Height (feet) 1 to 2 stories 42 46.5 +4.5
Protected Tree Removal N/A 88 181 -63
Employees N/A 330 363 +33
Notes:
1 Seven protected status trees have been removed between certification of the previous FEIR and the currently proposed project. These trees were removed as a result of their declining health. In total, the proposed project and current existing conditions results in 25 fewer protected trees on-site.

Page 189 of 1283 ends

Existing
Conditions
Previously
Approved
Project Proposed Project
Difference
(Previously
Approved vs.

Proposed)
Source: City of Milpitas. 2020, Initial Study 1000 Gibraltar Drive. June.

City of Milpitas. 2020. 1000 Gibraltar Drive Draft Environmental Impact Report, State Clearinghouse No. 2020069024. December.

Stantec, Kier-Wright. 2025. SSD–SSJ1 Entitlement Package. June 26.

Santa Clara Valley Urban Runoff Pollution Prevention Program. 2025. Provision C.3 Data Form for Gibraltar Industrial. August 8.

Responses to Appeal Letter
Appellant failed to raise any concerns related to impervious surface area during or prior to the Planning Commission hearing. Nor did Appellant prior to that hearing or this appeal submit any factual evidence showing that this change in surface area would affect the environmental impacts previously studied in the EIR, including given the current conditions of approval, required stormwater improvements, and the Stormwater Quality Control Plan. Not only did Appellant fail to raise the issue on appeal at the prior hearing, Appellant has failed to support the argument in their notice of appeal with factual evidence.

There are already existing established procedures for Federal Emergency Management Agency (FEMA) flood zone compliance as part of the City’s standard practices. City staff reviews projects removing/replacing impervious surfaces improvements pursuant to the latest Santa Clara County Urban Runoff Pollution Prevention Program (SCVURPPP) C.3 thresholds managed by the City’s Land Development Division during the Planning Entitlement review phase of the development review process and is codified in the City’s MMC Section XI-16, Stormwater and Urban Runoff Pollution Control. Effective July 1, 2023, all nonresidential development/redevelopment projects that create and/or replace 5,000 square-feet or more of impervious surface on the project site and single-family residential projects creating or replacing 10,000 square feet or more or impervious surface must complete the SCVURPPP Provision C.3 Data Form worksheet and submit it with the development project application. However, Public Works Land Development staff will check the applicable flood zone requirements and require appropriate improvements or conditions of approval for all projects resulting in changes to the impervious surface area. Additional information clarifying the project’s potential impact on flooding is below.

1. Any new project replacing over 5,000 square feet or more of impervious surface area will have to submit the SCVURPPP Provision C.3 Data Form to the City as part of the planning entitlement review process. The Applicant has already coordinated and submitted the C.3 Data Form to the City (Attachment K). and will improve the site upon its existing condition. The existing site has been improved with the current development since 1980, and has been vacant and unmaintained since 2018.

The Kier + Wright engineering firm letter as part of the Applicant Response Letter (Attachment J) indicates that the improved onsite stormwater management proposed as part of this project would actually result in a reduction of peak stormwater flows compared to existing conditions although the Proposed Project would increase the total impervious surface area from 851,336-square feet to 982,012-square feet. Design features as part of the C.3 requirements including the addition of five (5) bioretention basins help reduce runoff and improve stormwater detention. Overall, the engineering letter and studies done as part of the Proposed Project’s entitlement review indicate that the construction of the new project would improve onsite stormwater management and reduce peak stormwater flows compared to existing conditions.

2. Although the appeal letter states that the Project Site is in moderate flood risk, the site is in FEMA Flood Zone X (Shaded) (Attachment L), meaning that there is a 0.2 percent chance of a flood hazard each year. The Project Site is not in a Special Flood Hazard Area and, therefore, the proposed building and development do not need to be elevated to minimize potential flood impacts. The Public Works Land Development Division will coordinate with the Applicant during the building permit review phase to determine compliance with FEMA requirements. Additionally, regarding existing conditions and any history of flooding in Project Site and surrounding area, the City of Milpitas Storm Drain Master Plan 2021 (SDMP) evaluated the existing public storm drain system and identified potential flood areas from a 10-year storm. Per Figure 3-1 of the SDMP, there was no flooding near the Project Site.

3. The EIR and Addendum discussed and analyzed flood zone impacts and concluded the impacts to be “less than significant” rather than “no impact” as stated in the appeal letter. This discussion can be found in the DEIR (pg. 61) under X c(i)-(iv) and in the Addendum (pg. 107) under X c(i)-(iv).

Page 190 of 1283 ends

4. A certified EIR is not subject to legal challenge after the statute of limitations has expired as discussed in Attachment J. The EIR for the previously approved version of the project was certified by the City acting as the lead agency on March 24, 2021, and a Notice of Determination was filed on April 2, 2021.

The statute of limitations for challenging the certified EIR has long since expired and the certified EIR may no longer be challenged. Thus, the Appellant’s challenge of the certified EIR should not be considered on appeal. Due to the similarity of the Proposed Project to the previously approved project, the City prepared an Addendum to the previously certified EIR, which concluded that the Proposed Project would not result in any new impacts. However, the appeal letter challenges the adequacy of the previously certified EIR without addressing the adequacy of the Addendum or identifying any new impacts resulting from changes to the project. See Friends of the College of San Mateo Gardens v. San Mateo County Community College District (2016) 1 Cal.5th 937, 949.

5. Public Works Land Development Division staff have already added conditions of approval to ensure the Applicant provides the final improvement plans including a Stormwater Control Plan during the building permit review process and will be required prior to building permit issuance, which will be reviewed for compliance with applicable local, regional, state, and federal regulations related to stormwater and flooding. The Land Development Division’s City webpage contains resources and information related to private development projects, flood zone impacts, and C.3 requirements. Additionally, a Stormwater Management Facilities Operation and Maintenance Agreement will be required associated with the stormwater control plan including perpetual maintenance of treatment areas/units. Other Proposed Project improvements to associated infrastructure improvements including storm drain design will be required prior to off-site plan approval and encroachment permit issuance. Furthermore, staff would not have taken the Proposed Project to a public hearing until all major revisions or concerns to the entitlement submittal have been addressed by all reviewing City Departments. Additionally, the Applicant must agree to conditions of approval under the purview of each reviewing Department prior to the any project’s public hearing, which often include a list of additional requirements the project must meet and demonstrate compliance with during various stages of the building permit review phase post- entitlement and includes the requirement to pay applicable utility development impact fees. The Proposed Project’s conditions of approval were included as part of the Planning Commission’s Resolution No. 25-012 and have been included in the City Council’s Resolution with no changes proposed from the existing list.

In short, Appellant suggests that any increase in impervious surface area must necessarily result in a substantial increase in the severity of stormwater related environmental impacts requiring major revisions of the previous EIR. But Appellant fails to provide any factual basis in the record or otherwise showing that this difference would result in substantial erosion or siltation on or off-site, substantially increase the rate or amount of surface runoff in a manner that would result in flooding, substantially alter the existing drainage pattern of the site, exceed the capacity of existing or planned storm water drainage systems, provide substantial additional sources of polluted runoff, materially impede or redirect flood flows, or otherwise change the prior environmental analysis. Appellant gives no explanation why the current stormwater controls required on the project, which factor in any increase in impervious surfaces, do not adequately address these impacts.

To the contrary, the current project, including any additional impervious surfaces, will be built to the same or more rigorous stormwater control standards and conditions of approval that informed the prior analysis, including those within the Stormwater Quality Control Plan, and result in similarly limited and controlled environmental impacts that were adequately studied and addressed in the EIR. The project as currently conditioned continues to have hydrology and flooding impacts that are less than significant, with all regulatory requirements and best practices met. Appellant has identified a distinction from the prior project, which was adequately addressed in the Addendum and project conditioning and review, but fails to recognize how the current conditions on the project address this increased surface area, resulting in the project presenting substantially the same stormwater impact profile as before. Moreover, Appellant has failed to indicate any factual basis to believe this distinction is substantial or results in a difference to the prior analysis, let alone one that meets the standard for further environmental review pursuant to Public Resources Code Section 21166.

Therefore, staff recommends that the City Council adopt a resolution denying the appeal and affirming the Planning Commission’s decision to approve Site Development Permit No. SD24-0006, Environmental Assessment EA24-0002, and Tree Removal Permit No. TR25-0021 to construct the Proposed Project. The existing 28.96-acre lot has been vacant and underutilized with no active tenant or maintenance to the site and

Page 191 of 1283 ends

its facilities for over nine years, and would add an active warehousing and distribution center which is a principally permitted use with landscaping and offsite public improvements in the Heavy Industrial Zoning District, and include modern day improvements to stormwater and drainage infrastructure on the site.

POLICY ALTERNATIVE(S):

Alternative 1: Direct staff to draft a resolution to uphold the appeal and deny the Proposed Project.

Pros: A different project with other uses could be proposed at this site in accordance with the General Plan land use designation of Manufacturing and the M2 Heavy Industrial Zoning District.

Cons: The existing tenant space will remain vacant until a new tenant is proposed or a new development is proposed, which will require new planning entitlements. Unless a new development is proposed and constructed, the City would also lose an opportunity to collect development impact fees, require offsite public improvements, and benefit from increased property and potentially sales tax revenue.

Reason for Not Recommending: The Proposed Project meets the required findings for approval and is consistent with the City’s General Plan land use goals. The Proposed Project also would retain and revitalize an underutilized and large vacant industrial site with a permitted warehouse and distribution use, likely increasing property and sales tax revenue.

PROJECT SCHEDULE/KEY MILESTONES
City Council Approval: 12/2/25
Estimated Start of Construction: 2/10/26
Estimated Substantial Completion: 12/15/26
Estimated Final Occupancy: 1/29/27

FISCAL IMPACT:

If the Proposed Project is approved, the Applicant will apply for various building permits and encroachment permits to demolish all existing structures, and construct the new onsite buildings, site improvements, and offsite public improvements in the surrounding area. The new redeveloped site and business use is expected to generate additional revenue to the City through new employment land and sales taxes. The Office of Economic Development has provided a letter outlining potential fiscal impacts (Attachment M).

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):

The City as Lead Agency determined that pursuant to CEQA Guidelines Sections 15162 and 15164 (Addendum to an EIR or Negative Declaration), an Addendum to the 1000 Gibraltar Drive FEIR (SCH No. 2020069024) should be prepared for the proposed Project, which was published on the City’s website on September 5, 2025. Sections 1.2.1 (Findings) and 1.2.2 (Conclusions) of the Addendum finds that the impacts of the proposed Project remain consistent with the impacts previously analyzed in the certified 1000 Gibraltar Drive FEIR. The Addendum further concludes that the Proposed Project does not require any substantial revisions to the 1000 Gibraltar Drive FEIR, and that no new significant information or changes in circumstances surrounding the Proposed Project have occurred since the certification of the 1000 Gibraltar Drive FEIR, and that no subsequent EIR is necessary.

As required by Public Resources Code Section 21081.6(a)(1), an updated Mitigation Monitoring and Reporting Program (MMRP), adapted from the FEIR, was prepared and requires the relevant applicable mitigation measures from the FEIR to apply to the Addendum. The Addendum and its MMRP with supporting technical reports and information to the Addendum are included as Attachment D to this agenda report, demonstrates that the previous analysis completed for the 1000 Gibraltar Drive FEIR remains adequate under CEQA; therefore, no further environmental review is required.

ATTACHMENT(S):
(a) City Council Resolution
(b) 1000 Gibraltar Dr Planning Commission 3-24-21 Staff Report, Resolutions 21-006 and 21-007 (c) PC 1000 Gibraltar Dr Draft and Final Environmental Impact Report (SCH #2020069024) (d) PC 1000 Gibraltar Dr Addendum, MMRP, Appendices A-D (e) PC 1000 Gibraltar Staff Report 9.10.25
(f) PC 1000 Gibraltar Resolution 25-012

Page 192 of 1283 ends

(g) PC 1000 Gibraltar Project Plans
(h) 9-10-25 PC Meeting Minutes
(i) 1000 Gibraltar Dr - Appeal Application and Letter
(j) 1000 Gibraltar Dr - Applicant Response Letter to Appeal with Attachments FCS and KW (k) 1000 Gibraltar Dr C.3 Data Form
(l) 1000 Gibraltar FEMA FIRMETTE Map
(m) Office of Economic Development - 1000 Gibraltar Letter of Support

Page 193 of 1283 ends

RESOLUTION NO. _____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MILPITAS, DENYING THE APPEAL BY AFFIRMING THE PLANNING COMMISSION’S DECISION TO APPROVE SITE DEVELOPMENT PERMIT NO. SD24-0006, ENVIRONMENTAL ASSESSMENT NO. EA24-0002, AND TREE REMOVAL PERMIT NO. TR25-0021, TO REMOVE AND REPLACE 25-ORDINANCE SIZED

TREES, DEMOLISH ALL EXISTING STRUCTURES ON THE SITE INCLUDING

FOUR INDUSTRIAL/OFFICE BUILDINGS, SURFACE PARKING LOTS, AND

ASSOCIATED IMPROVEMENTS, AND DEVELOP A NEW, ONE-STORY,
487,564-SQUARE FOOT TILT-UP CONCRETE INDUSTRIAL BUILDING WITH OFFICE SPACE, SURFACE PARKING LOTS, 781 VEHICLE PARKING SPACES, 50 OVERSIZED TRUCK TRAILER PARKING SPACES, AND
ASSOCIATED SITE IMPROVEMENTS ON AN APPROXIMATELY 28.96-ACRE SITE IN THE M2 (HEAVY INDUSTRIAL) ZONING DISTRICT LOCATED AT 1000 GIBRALTAR DRIVE (ALSO KNOWN AS 1001 S. MILPITAS BLVD.) (APN 086-42-033); AND ADOPT THE ADDENDUM TO THE 1000 GIBRALTAR DRIVE FINAL ENVIRONMENTAL IMPACT REPORT (SCH NO. 2020069024), MAKING CEQA FINDINGS PURSUANT TO CEQA GUIDELINES SECTION 15162 AND 15164.

WHEREAS, on March 24, 2021, by adoption of Resolution No. 21-006, the Planning Commission of the City of Milpitas approved to demolish existing onsite buildings, parking lots, and associated improvements and to remove and replace 88 ordinance-sized trees, construct a new, 491,040-square foot tilt-up concrete distribution center with office space, parking lots, 346 vehicle parking spaces, 101 truck trailer spaces, and associated site improvements located at 1000 Gibraltar Drive per Site Development Permit No. SD19-0008, Environmental Assessment EA20-0007, and Tree Removal Permit TR19-0007 (the “previous project”); and

WHEREAS, in order to evaluate the previous project under the California Environmental Quality Act (“CEQA,” codified at Public Resources Code § 21000, et seq., as further governed by the CEQA Guidelines, found at 14 C.C.R. § 15000, et seq.), an environmental impact report was prepared (the Draft EIR, as revised by the Final EIR’s errata section, together with the other sections of the Final EIR, are collectively referred to herein as the “1000 Gibraltar Drive FEIR,” State Clearinghouse No. 2020069024) was certified on March 24, 2021, by the Planning Commission by adoption of Resolution No. 21-007 available for review at https://www.milpitas.gov/379/Environmental-Documents-CEQA; and

WHEREAS, on June 22, 2022, by adoption of Resolution No. 22-008, the Planning Commission of the City of Milpitas approved a time extension request per Time Extension No. TE22-0005 to extend the expiration date of the previous project’s entitlements, Site Development Permit No. 19-0008 and Tree Removal Permit No. TR19-0007 to March 24, 2024. The approved project entitlements expired as the development did not vest the previous project per Milpitas Municipal Code Section XI-10-64.06, Expiration of Permit or Approvals, and was not constructed; and

WHEREAS, on November 25, 2024, Panattoni Development Company (“Applicant”), on behalf of the property owner, submitted an application to the City of Milpitas for the approvals necessary for Site Development Permit SD24-0006, Environmental Assessment EA24-0002, and Tree Removal Permit

Page 194 of 1283 ends

TR25-0021. The proposed development (the “Project”) is a similar but modified version of the previous project, thus consists of and requires:

a. Site Development Permit (P-SD24-0002): Develop a new, one-story, 487,564-square foot tilt-up concrete industrial building with office space and associated site improvements, including new internal roadways, landscaping, offsite public improvements, and a new surface parking lot with 781 vehicle parking spaces, 50 oversized parking stalls for tractor- trailers, and 27 loading dock doors; and

b. Environmental Assessment (P-EA24-0002): Consider an Addendum to the 1000 Gibraltar Drive Final Environmental Impact Report (State Clearinghouse No. 2020069024); and

c. Tree Removal Permit (P-TR25-0021): To remove 25-ordinance sized trees pursuant to Section X-2-4.02 of the Milpitas Municipal Code.

WHEREAS, Milpitas City Staff conducted a full analysis of the Project to ensure compliance with the City’s General Plan, Zoning Ordinance, Engineering Design Requirements, Transportation Analysis Guidelines, and all other applicable laws, regulations and standards, as all further explained in detail in City staff’s report to the Planning Commission; and

WHEREAS, the Planning Division completed an environmental impact assessment for the project in accordance with the California Environmental Quality Act (“CEQA”) and prepared an Addendum to the 1000 Gibraltar Drive FEIR in accordance with CEQA, and State and local guidelines implementing CEQA; and

WHEREAS, the Addendum to the 1000 Gibraltar Drive FEIR concluded that impacts of the proposed Project are consistent with or less than the previous project and the environmental analysis conducted for the same;

WHEREAS, in connection with the approval of a project involving the preparation of an environmental impact report that identifies one or more significant effects, CEQA requires the decision- making body of the lead agency to incorporate feasible mitigation measures that would reduce those significant environment effects to less than significant level; and

WHEREAS, whenever a lead agency approves a project requiring the implementation of measures to mitigate or avoid significant effects on the environment, CEQA also requires a lead agency to adopt a Mitigation Monitoring and Reporting Program to ensure compliance with the mitigation measures during the project implementation; and

WHEREAS, the City of Milpitas is the lead agency, and the Milpitas Planning Commission is the decision-making body for the proposed Project; and

WHEREAS, on September 10, 2025, the Planning Commission held a duly noticed public hearing on the subject application, at which all those in attendance were given the opportunity to speak on the Project; and

WHEREAS, the Milpitas Planning Commission reviewed and considered the Addendum to the 1000 Gibraltar Drive FEIR (“Addendum”), attached hereto and incorporated herein as Exhibit 2, together

Page 195 of 1283 ends

with the Addendum’s Mitigation Monitoring and Reporting Program for the Project, attached hereto and incorporated herein as Exhibit 3, and adopted the Addendum’s Mitigation Monitoring and Reporting Program, as modified by this Resolution, to ensure the Project is in compliance with CEQA and State and local guidelines implementing CEQA at its meeting on September 10, 2025; and

WHEREAS, per 14 C.C.R. §§ 15162 and 15164, the Planning Commission adopted the Addendum, together with its findings and conclusions that no supplemental or subsequent environmental review is required because: (a) no substantial changes are proposed in the Project which will require major revisions of the 1000 Gibraltar Drive FEIR; (b) no substantial changes have occurred with respect to the circumstances under which the Project is being undertaken which will require major revisions in the 1000 Gibraltar Drive FEIR; and (c) no new information which was not known and could not have been known at the time the 1000 Gibraltar Drive FEIR was certified has become available; and

WHEREAS, as separate and independent bases, the Planning Commission found and determined that the Project is exempt from further CEQA review pursuant to CEQA Guidelines Section 15183 (Projects Consistent with a Community Plan, General Plan or Zoning); and

WHEREAS, the Planning Commission of the City of Milpitas approved Site Development Permit No. SD24-0006, Environmental Assessment EA24-0002, and Tree Removal Permit TR25-0021 at the public hearing on September 10, 2025; and

WHEREAS, on September 22, 2025, within the time allowed by the Milpitas Municipal Code, Michael M. Tsai Law Firm on behalf of Carpenters Local Union #405 (“Appellant”) appealed the Planning Commission’s approval of issuance of Site Development Permit No. SD24-0006, Environmental Assessment EA24-0002, and Tree Removal Permit TR25-0021; and

WHEREAS, on November 18, 2025, the City Council held a duly-noticed public hearing on the appeal, at which time all those in attendance were given the opportunity to speak on the Project; and

WHEREAS, the City Council considered all of the written and oral testimony presented at the public hearing on the appeal, including evidence presented by City staff, the Appellant, and the public in making its decision.

NOW, THEREFORE, the City Council of the City of Milpitas hereby finds, determines, and resolves as follows:

SECTION 1. Recitals

The City Council has duly considered the full record before it, which may include but is not limited to such things as the City staff report, testimony by staff and the public, and other materials and evidence submitted or provided to the City Council. Furthermore, the recitals set forth above are found to be true and correct and are incorporated herein by reference.

SECTION 2: Record

The location and custodian of the documents or other material which constitute the record of proceedings upon which this decision is based is within the Planning Department, City of Milpitas, 455 East Calaveras Boulevard, Milpitas, California 95035.

Page 196 of 1283 ends

SECTION 3. CEQA Finding

An Addendum to the 1000 Gibraltar Drive Final Environmental Impact Report (FEIR) (SCH No. 2020069024) was published on September 5, 2025. The Addendum finds that the impacts of the proposed Project remain consistent or less than with the impacts previously analyzed in the certified 1000 Gibraltar Drive FEIR. The Addendum further concludes that proposed Project does not require any substantial revisions to the 1000 Gibraltar Drive FEIR, that no new significant information or changes in circumstances surrounding the proposed Project have occurred since the certification of the 1000 Gibraltar Drive FEIR, and that the previous analysis completed for the 1000 Gibraltar Drive FEIR remains adequate under CEQA. As further discussed in the Addendum, the Addendum’s Mitigation Monitoring Reporting Program (MMRP) has been updated to identify the relevant mitigation measures applicable to the Project from the 1000 Gibraltar Drive FEIR’s MMRP. The City Council therefore finds that its actions are consistent with CEQA and CEQA Guidelines Sections 15162 and 15164, and that no additional environmental review is required. The City Council hereby approves and affirms the adoption of this Addendum and its Mitigation Monitoring and Reporting Program, attached hereto and incorporated herein as Exhibit 2 and Exhibit 3, respectively.

SECTION 4. Site Development Permit (MMC Section XI-10-57.03(F))

The City Council confirms the following findings based on the evidence in the public record in approving Site Development Permit No. SD24-0006:

1. The layout of the site and design of the proposed buildings, structures and landscaping are compatible and aesthetically harmonious with adjacent and surrounding development.

The proposed Project’s architecture is reflective of a modern and ‘Contemporary’ architectural style that incorporates various wall planes and massing elements that adds interest to the proposed elevations and was modeled to be similar from the previously approved building. The high-quality architecture sets a new standard for future development in the heavy industrial zoned area.

Although the proposed warehouse will be one-story tall, the proposed architectural design with alternating colors, delineations, and materials provides the illusion that the building could be more than one-story. The exterior façade of the Project includes three, two-story glass corners including the main office entry and surrounding site vantage points while the bulk of the structure is offset by various façade elements including concrete panel accents and multi-colored paint patterns with three different shades of gray and a blue accent trim and two types of blue-glazed glass.

The proposed landscaping plan is compatible as it adds a variety of drought tolerant groundcovers and approximately 234 new trees, in addition to retaining approximately 58 existing trees along the perimeter of the site and will include modern stormwater bioretention areas. The proposed new surface parking lots will also be a substantial improvement from the existing unmaintained site with new striped parking stalls, EV ready and EV charging stalls, landscaping, and delineated areas for trucks, employee/visitor parking, and flex delivery drivers.

Generally, buildings surrounding the Project site vary in height. At a maximum height of 46.5- feet up to 49.5-feet to the top of parapet, the proposed building complements neighboring one- to two-story buildings that are also industrially zoned uses. The varying rooflines add to the building’s aesthetic and the Applicant has provided line of sight studies in the proposed plan set

Page 197 of 1283 ends

to ensure that rooftop equipment is adequately screened by parapets from any ground or street level vantage point, as well as realistic renderings which demonstrate that the proposed Project will be compatible to the neighborhood in scale, bulk, and height and will be aesthetically harmonious with adjacent and surrounding development.

2. The Project is consistent with the Milpitas Zoning Ordinance.

The Project site is zoned M2 (Heavy Industrial). It is anticipated that the facility would operate as a warehousing and distribution center and is a permitted use per MMC Table XI-10-7.02-1 “Industrial Zone Uses”. As demonstrated in Table 1, the Project complies with the required setbacks, number of parking spaces, landscaped area, and maximum floor area ratio. The proposed signage will be reviewed under a future separate permit.

Although the M2 Zoning District does not identify any maximum height limits, the construction of any new building greater than 35-feet in height requires the Planning Commission to make a finding that any such excess height will not be detrimental to the light, air or privacy of any other structure or use currently existing or anticipated, pursuant to MMC XI-10-7.03. The Planning Commission approved the finding at the public hearing on September 10, 2025. Given that heights of surrounding structures vary and there are sufficient setbacks between the proposed building and structures on adjacent parcels and the Project would be largely centered around the surface parking lot in a large 28.96-acre lot, the proposed height of the Project would not be detrimental to the light, air, or privacy of any other structure as further demonstrated by the renderings on Sheet A601 of the proposed plans.

Additionally, during the development review process, Planning staff asked the Applicant if it was feasible to reduce the maximum height of the building to 35-feet or below; however, the Applicant indicated that the proposed height is the minimum required height necessary for the feasibility of the development to occur and support the operations of the Project, provides more storage and shelfing capacity, and is the industry standard to include interior ceiling heights at a minimum of 36-40 feet.

Table 1: Heavy Industrial (M2) Zoning District
Development Standards Conformance

Standards M2
Requirements Proposed Complies
Front Setback
(Min.) 35 feet from face of curb 65 feet, 9 inches Yes Street Side
Setback (Min.) 35 feet from face of curb 73 feet Yes Rear Setback
(Min.) None 217 feet Yes
Floor Area Ratio
(FAR) 1.0 0.387 Yes

Page 198 of 1283 ends

Landscaping Required front yard area and
required side yard area
New landscaped
areas within
required front
yard and side yard
areas
Yes
Parking
Office: 1 per 350 sq. ft.

Warehouse:1 per 1,500 sq. ft.
349 stalls required
781 stalls Yes
Building Height
(Max.)
None. However, prior to
construction of any structure
that exceeds three (3) stories
or thirty-five (35) feet in
height, the Planning
Commission made the
finding as stated in the
Complies column at the public
hearing on 9/10/25
46 feet, 6 inches;
up to 49 feet, 6
inches to top of
parapet
Yes, the Planning
Commission made the
following finding on
9/10/25:

That any such excess height
will not be detrimental to the
light, air or privacy of any
other structure or use
currently existing or
anticipated.

3. The Project is consistent with the Milpitas General Plan.

The proposed Project is consistent with the Milpitas General Plan, as demonstrated and outlined in Table 2, and particularly Policy ED 1-5, which wants to make Milpitas a more predictable place for companies to do business by reducing impediments to growth and actively planning to provide adequate space for companies to provide long-term growth needs, and Policy LU 7-3, which encourages the development of new industrial areas and the redevelopment of existing older or marginal areas with new similar uses, especially those in locations which facilitate efficient multi- modal commute patterns. The proposed Project will be developed on an existing corporate industrial/office campus lot spawning 28.96-acres that has been underutilized and vacant since 2018 and is over 45 years old. The Project is also considered an infill development on previously developed land and will be served by existing utilities and will ensure the land continues to be used as an industrial use, providing a desired manufacturing land use as a warehousing and distribution center that is specifically listed in the General Plan’s description for Manufacturing (MFG). The City’s Office of Economic Development has also provided a letter of support.

Furthermore, reinvestment into the Project site will help promote additional economic activity into the area and employment opportunities, as well as provide offsite public improvements that was coordinated closely with the Applicant and City’s Engineering Division.

Table 2: General Plan Consistency

Policy Consistency Finding
ED 1-3: Strengthen the City’s position as a
premier regional location for high-tech industrial
and advanced manufacturing uses in Silicon
Valley.

Consistent: The City embarked on a
multi-year process to update the City’s
General Plan in 2016, which included
several consultant-prepared studies
including economic development
projections, which at the time saw

Page 199 of 1283 ends

Policy Consistency Finding
increasing potential growth of attracting
new high-tech industrial and advanced
manufacturing uses in the City. The
previously approved project was
submitted before the unprecedented
global COVID-19 pandemic and was
approved in the midst of the pandemic in
March 2021, at a time of uncertain
economic conditions and high
construction costs. As such, construction
of the previous project became financially
infeasible, resulting in expired
entitlements. As economic conditions
began to improve over time, renewed
interest in redeveloping this subject lot
with a modified Project proposal ensued.

Approval of the proposed Project would
attract an established web-based retail
tenant or similar prospective tenants to
invest in the site and City as a viable “last
mile” warehousing and distribution
facility and ensure the lot remains as an
industrial use and strengthens the City’s
position as a premier regional location in
Silicon Valley. The Project site is also
strategically located near major freeways
and the Applicant has strategically
modified the Project’s surface parking lot
design from the previously approved
entitlements for efficiency, including
separating locations for access and
circulation for trucks, employee/visitor
vehicles, and flex delivery parking in
designated areas of the surface parking lot
with gates separating internal access into
the truck yard area.

ED 1-5: Make Milpitas a more predictable place
for companies to do business by reducing
impediments to growth and actively planning to
provide adequate space for companies to meet
long-term growth needs.

Consistent: The proposed Project’s new
concrete tilt up industrial warehouse
building and site planning was carefully
modified from the expired entitlements to
plan for the future growth of a web-based
retail tenant to meet long-term growth
needs and add an employment center with
local job opportunities. The Addendum
prepared to the 1000 Gibraltar Drive Final

Page 200 of 1283 ends

Policy Consistency Finding
Environmental Impact Report estimates
the Project to generate an average of 363
employees, which also accounts for
seasonal fluctuations.

The large 28.96-acre site has been vacant
and underutilized since 2018, and the
City’s General Plan 2040 prioritizes the
maintenance of its industrial lands with
active uses and tenants that are consistent
the intent of the Manufacturing land use
designation. Additionally, the City’s
Office of Economic Development
provided a letter of support for the Project.

LU 7-3: Encourage the development of new
industrial, manufacturing, and business park areas
and the redevelopment of existing older or
marginal areas with new similar uses, especially
those in locations which facilitate efficient multi-
modal commute patterns. Use available public
financing to provide necessary infrastructure
improvements to encourage economic
development and revitalization.

Consistent: The redevelopment of the
existing, outdated, and underutilized site
will lead to a new state-of-the-art modern
industrial warehousing building with
careful site planning, such as locating all
oversized trucks and trailers in the parking
lot to be separated by different entry
points with two protective gates, while
ensuring adequate parking, access and
circulation remains for other passenger
vehicle types with new improved
pedestrian walkways.

Through these ongoing coordination
efforts with City staff, the Applicant has
agreed to several off-street public
improvements including but not limited to
pavement restoration along portions of
Gibraltar Drive and S. Milpitas Blvd.,
sidewalk replacements along perimeter of
the lot to meet ADA requirements, and
operational upgrades to traffic signals at
the S. Milpitas Blvd./Ames Avenue and
Gibraltar Drive intersections. The
improvements will be coordinated by the
City’s Engineering Division with the
Applicant and are included as Conditions
of Approval.

CD 1-2: Encourage infill development projects to
accommodate contemporary uses and design and
planning approaches and requirements in manner
Consistent: This infill Project will
accommodate a new
warehouse/distribution building to serve
the needs of a contemporary business that

Page 201 of 1283 ends

Policy Consistency Finding
that minimizes conflicts with the surrounding
existing development.
would be constructed with a modern
design to replace a dilapidated corporate
industrial office campus site that was
constructed over 45 years ago around
1980.

The Project site is surrounded by a mix of
other commercial, office, manufacturing,
and industrial uses and the Project will
retain its industrial land use. Therefore, the
proposed Project will not create a conflict
with the surrounding development and will
add to the diversity of contemporary
building types in the area.

SECTION 5: City Council Decision and Approval

The City Council of the City of Milpitas hereby denies the appeal by affirming the Planning Commission’s approval of the Project by adopting the Addendum to the 1000 Gibraltar Drive Final Environmental Impact Report per Environmental Assessment No. EA24-0002, attached hereto as Exhibit 2, and approves Site Development Permit No. SD24-0006 and Tree Removal Permit No. TR25-0021 based on the above Findings and subject to the Conditions of Approval, attached hereto as Exhibit 1 and the Addendum’s Mitigation Monitoring and Reporting Program, attached hereto as Exhibit 3 incorporated herein.

PASSED AND ADOPTED this 18th day of November 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

ATTEST:

___________________________
Suzanne Guzzetta, City Clerk
APPROVED:

Carmen Montano, Mayor

APPROVED AS TO FORM:

___________________________
Christopher Creech, Acting City Attorney

Page 202 of 1283 ends

EXHIBIT 1

CONDITIONS OF APPROVAL
1000 GIBRALTAR DRIVE
(ALSO KNOWN AS 1001 S. MILPITAS BLVD)
(APN 086-42-033)

SITE DEVELOPMENT PERMIT NO. SD24-0006
ENVIRONMENTAL ASSESSMENT NO. EA24-0002
TREE REMOVAL PERMIT NO. TR25-0021

The City of Milpitas City Council approves Site Development Permit No. SD24-0006, Environmental Assessment No. EA24-0002, and Tree Removal Permit No. TR25-0021, in accordance with Chapter 21 and Sections XI-10-57.03, XI-2-4.02, and XI-10-7.03-1, of the Milpitas Municipal Code, subject to and conditioned upon all applicable State and local laws and regulations and the Conditions of Approval outlined below. This Site Development Permit, Environmental Assessment, and Tree Removal Permit entitlement includes the demolition of four industrial/office buildings, surface parking lots, and associated improvements, and allow the development of a new, one-story, 487,564-square foot tilt-up concrete industrial building with office space and associated site improvements on an approximately 28.96-acre site in the M2 (Heavy Industrial) Zoning District located at 1000 Gibraltar Drive (also known as 1001 S Milpitas Blvd.). The height of the new building will be approximately 46-feet and 6-inches above grade level (up to a maximum height of 49-feet and 6-inches to top of parapet). Proposed site improvements include new internal roadways, landscaping, offsite public improvements, and a new surface parking lot with 781 vehicle parking spaces, 50 oversized parking stalls for tractor-trailers, and 27 loading dock doors.

These approvals are subject to all other necessary reviews, approvals, studies, and inspections necessary for such development including for the issuance building permits or occupancy.

APPROVED SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL:

General Conditions

1. General Compliance. The Permittee/Applicant and owner, including all successors in interest (collectively “Permittee”) shall comply with each and every condition set forth in this Permit. No certificate of occupancy or temporary certificate of occupancy shall be issued for the development project described in Site Development Permit No. SD24-0006, Environmental Assessment No.

EA24-0002, and Tree Removal Permit No. TR25-0021 (collectively “Permit”), and the Permit shall have no force or effect and no building permit shall be issued unless and until all things required by the below-enumerated precedent conditions have been performed or caused to be performed. (P)

2. The Permittee shall develop the approved project in conformance with the approved plans (dated August 8, 2025), and sample color and materials approved by the Planning Commission on September 10, 2025, and reaffirmed approval at the Project’s City Council appeal hearing on November 18, 2025, in accordance with these Conditions of Approval. (P)

3. Modifications to Project. Any deviation from the approved site plan, floor plans, or other approved submittal shall require that, prior to the issuance of building permits, the Permittee shall submit modified plans and any other applicable materials as required by the City for review and obtain the

Page 203 of 1283 ends

approval of the Planning Director or Designee. If the Planning Director or designee determines that the deviation is significant, the Permittee shall be required to apply for review and obtain approval of the Planning Commission, in accordance with the Zoning Ordinance. (P)

4. Effective Date. Unless there is a timely appeal filed in accordance with the Milpitas Zoning Code, the date of approval of this Permit is the date on which the decision-making body approved this Permit. (P)

5. Conditions of Approval. As part of the issuance of building permits, the Permittee shall include within the first four pages of the working drawings for a plan check, a list of all conditions of approval imposed by the final approval of the project. Each and every condition set forth in this Exhibit shall apply to the Project and continue to apply to the Project so long as the Permittee is operating the Project under the permits and approvals in this Resolution (P)

6. Written Response to Conditions. The Permittee shall provide a written response to the Conditions of Approval indicating how each condition has been addressed with the building permit application submittal. (ALL)

7. Permit Expiration. Pursuant to Section XI-10-64.06 of the Milpitas Municipal Code, this Permit shall be deemed to have expired and become null and void if the activity permitted by this Permit is not commenced within two (2) years from the date of approval, or for a project submitted with a tentative map, within the time limits of the approved tentative map. Pursuant to Section XI- 10-64.06(B) of the Milpitas Municipal Code, an activity permitted by this Permit shall be deemed to have commenced when the project:
a. Completes a foundation associated with the project; or b. Dedicates any land or easement as required from the zoning action; or c. Complies with all legal requirements necessary to commence the use, or obtains an occupancy permit, whichever is sooner.

8. Time Extension. Pursuant to Section XI-10-64.07 of the Milpitas Municipal Code, unless otherwise provided by State law, Permittee shall have the right to request a one-time extension of the Permit if the request is made in writing to the Planning Division prior to the expiration date of the approval. (P)

9. Project Job Account. If Permittee’s project job account is at any time delinquent or below the required deposit amount, City will not continue to review or process the application until Permittee’s private job account is paid in full and the required deposit has been made. Additionally, prior to the issuance of any building permit or occupancy permit, as applicable, Permittee shall pay in full the project account balance and establish a remaining balance of at least twenty-five percent (25%) of the required initial deposit. (P/E)

10. Cost and Approval. Permittee shall fully complete and satisfy each and every condition set forth in this Resolution and any other condition applicable to the project to the sole satisfaction of the City.

Additionally, Permittee shall be solely responsible and liable for the cost to satisfy each and every condition. Permittee shall pay all required fees and charges to the City at the rate in effect at time of building permit issuance, or, the rate in effect when the fees and charges are due and paid in full

Page 204 of 1283 ends

to the City. There is no vesting of any fees or charges with the adoption of this Resolution. (ALL)

11. Conditions. Each and every condition set forth in this Exhibit shall apply to the project and continue to apply to the project so long as the Permittee is operating the project under the permits and approvals in this Resolution. (ALL)

12. Compliance with Laws. The construction, use, and all related activity authorized under this Permit shall comply with all applicable local, state, and federal laws, rules, regulations, guidelines, requirements, and policies. (CA/P)

13. Acceptance of Permit. Should Permittee fail to file a timely appeal within twelve (12) calendar days of the date of approval of this Permit, inaction by Permittee shall be deemed to constitute each of the following:
a. Acceptance of this Permit by Permittee; and
b. Agreement by the Permittee to be bound by, comply with, and to do all things required of or by Permittee pursuant to all of the terms, obligations, and conditions of this Permit. (P)

14. Indemnification. To the fullest extent permitted by law, Permittee shall indemnify, defend with counsel of the City’s choosing, and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents (the “Indemnified Parties”) from and against any and all third party claim, action, or proceeding against City and/or the Indemnified Parties to attack, review, set aside, void or annul the City’s approval of SITE DEVELOPMENT PERMIT NO. SD24-0006, ENVIRONMENTAL ASSESSMENT NO. EA24-0002, AND TREE REMOVAL PERMIT NO. TR25-0021; including any environmental determination made therefore. This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, reasonable attorneys' fees, and other reasonable expenses incurred in connection with such claim, action, causes of action, suit or proceeding. The Permittee shall pay to the City upon demand or, as applicable, on a monthly basis to counsel of City’s reasonable choosing, amounts owed pursuant to the indemnification requirements prescribed in this condition, provided each such demand or monthly payment request includes reasonably detailed back-up documentation, including invoices and/or receipts, as applicable, for all amounts to be paid. Notwithstanding the foregoing, City shall have the right to redact invoices and/or receipts as necessary to preserve attorney-client privilege.

City shall promptly notify the Permittee of any claim, action, or proceeding and shall engage in reasonable efforts to cooperate in the defense. If City fails to so promptly notify the Permittee, or if City fails to engage in reasonable efforts to cooperate in the defense, then the Permittee’s indemnification obligations as set forth in this condition of approval shall thereafter terminate. The Permittee shall not be required to pay or perform any settlement unless the settlement is approved by the Permittee. The above indemnification is intended to be as broad as permitted by applicable law. To the extent the above indemnification is limited by Government Code Section 66474.9, any limitations shall only apply to SITE DEVELOPMENT PERMIT NO. SD24-0006, ENVIRONMENTAL ASSESSMENT NO. EA24-0002, AND TREE REMOVAL PERMIT NO. TR25-0021, and the balance of the Permit shall be unaffected by said Government Code section. (CA)

15. Revocation, Suspension, Modification. This Permit may be suspended, revoked, or modified in accordance with Section XI-10-63.06 of the Milpitas Municipal Code. (P)

Page 205 of 1283 ends

16. Severability. If any term, provision, or condition of this Permit is held to be illegal or unenforceable by the Court, such term, provision, or condition shall be severed and shall be inoperative, and the remainder of this Permit shall remain operative, binding, and fully enforceable. (ALL)

17. Certificate of Insurance: Permittee shall provide certificate of insurance and name City as an additional insured in its insurance policies for the Project.

18. Previous Approvals. Permittee shall abide by and continue to comply with all previous City approvals, permits, or requirements relating to the subject property, unless explicitly superseded or revised by this Permit. (P)

PLANNING DEPARTMENT

CONDITIONS OF APPROVAL

19. Significant Deviation of Use: Given that the tenant could be subject to change at any time, should a future tenant propose a use that significantly deviate from the approved project, the Planning Director or designee may require additional analysis to demonstrate the extent of environmental impact of the proposed use. If the Planning Director or designee determines that the deviation is significant, the Permittee shall be required to apply for review and obtain approval of the Planning Commission, in accordance with the Zoning Ordinance. (P)

20. Tree Removal Permit: Removal of any protected trees shall require a tree removal permit that is issued from the Planning Department. Removal of any protected trees shall be replaced at a 2:1 ratio as provided by Tree Removal Permit P-TR25-0021. Any proposed changes to the proposed tree planting plan and/or landscaping sheets from the project plan set dated August 8, 2025, approved at the Planning Commission public hearing on September 10, 2025, and reaffirmed approval at the Project’s City Council appeal hearing on November 18, 2025, shall be reviewed and approved by the Planning Department. (P)

21. Environmental Assessment Compliance: The Project is subject to the applicable mitigation measures in the Mitigation, Monitoring, and Reporting Program (MMRP) in the 15164 Addendum (August 2025) to the 1000 Gibraltar Drive Final Environmental Impact Report (March 2021) (SCH# 2020069024). Permittee shall comply with the requirements of the Addendum’s MMRP (Exhibit 3) pursuant to State law (Public Resources Code Section 21081.6). (P)

22. Public Art Requirement: Permittee shall comply with the City’s Public Art Requirements for Private Development, as set forth in Milpitas Municipal Code Section XI-10-14. If Permittee opts to pay a fee in lieu of installing public art on site, the fee shall be no less than one-half of one percent of building development costs and shall be payable at time of building permit issuance, or installation of “Public Art”, as defined per MMC Section V-20-310 and XI-10-14.01. (P)

23. Parking: The Project shall supply at least 781 vehicle parking spaces and 50 oversized truck trailer parking spaces onsite, pursuant to the project plans dated August 8, 2025, approved at the Planning Commission hearing on September 10, 2025, and reaffirmed approval at the Project’s City Council appeal hearing on November 18, 2025. Any deviations shall be reviewed by the Planning Division, meet minimum requirements of the City’s Municipal Code for Off-Street Parking Regulations and

Page 206 of 1283 ends

shall maintain compliance with all applicable laws. (P)

24. Landscaping: Prior to certificate of occupancy permit issuance, all required landscaping shall be planted in place. All planter areas (including containerized planters) shall be serviced by a sprinkler or drip system. (P)

25. Landscaping Maintenance and Replacement: All required landscaping, as approved on the final landscape plan, shall be replaced and continuously maintained as necessary to provide a permanent, attractive and effective appearance. (P)

26. Lighting: Exterior lighting shall be shielded or recessed so that direct glare and reflections are contained within the boundaries of the parcel, and shall be directed downward and away from adjoining properties and public rights-of-way. Fixtures shall be appropriate in terms of height, style, design, scale and wattage to the use of the property. Fixtures shall be spaced appropriately to maximize pedestrian safety. Prior to building permit issuance, the Permittee shall submit details and elevations of all site lighting fixtures to the Planning Division for review and approval. (P)

27. Trash Enclosures and Equipment Screening: All trash enclosures and equipment screening shall meet MMC Section XI-10-54.16, Trash Enclosures, Equipment and their Screening. Rooftop equipment shall be adequately screened from the parking lot areas and street level views through rough design that is architecturally integrated with the building, such as equipment wells and parapets. All ground-mounted and mechanical equipment including ground transformers and meters shall be adequately screened, if feasible, and subject to the Planning Department review and approval. If the screening is proven infeasible as solely determined by the Planning Director, then all ground-mounted equipment and surrounding bollards (if any) shall be of design and color that will minimize visual impact. (P)

28. Signage: Prior to approval of any signage for the development, proper applications, depending on signage type will need to be submitted to the Planning Department. (P)

OFFICE OF HOUSING

CONDITIONS OF APPROVAL

29. Non-Residential Affordable Housing Impact Fee: Per MMC Section XII-1-5.01 of the City’s Affordable Housing Ordinance, the Project is subject to payment of a non-residential affordable housing impact fee due prior to the issuance of the building permit. The impact fee will be calculated per MMC Section XII-1-5.02 and per Section MMC XII-1.5.01 is subject to change and will be officially calculated once the gross non-residential square footage is finalized and the building permit application is approved.

PUBLIC WORKS DEPARTMENT - ENGINEERING DIVISION

CONDITIONS OF APPROVAL

PRIOR TO CONSTRUCTION PLAN SUBMITTALS
The following conditions shall be met prior to any detailed construction plan check submittals (Building or Engineering, except demolition and rough grade plans), unless otherwise approved by the City

Page 207 of 1283 ends

Engineer. City reserves the right to reject any plan check submittal if any of the following conditions are not met. (E)

30. Modifications: The Site Development Plan plans dated 8/8/2025 is subject to change during the plan check stage based upon City’s previous comments and conditions stated herein.

31. Solid Waste and Recycling Handling Plan: Permittee shall submit final Solid Waste and Recycling Handling Plan based upon City’s previous comments for City’s review and approval by the Solid Waste Program. The Plan shall show calculations of waste generation volumes and how materials will be transferred from the waste generation areas to the trash enclosure/external collection point; demonstrate how recycling food waste, and yard trimmings shall have a separately maintained process from garbage handling; address other requirements such as waste generation and compactor sizing, chute shut-off and property management responsibility for bin management and litter control; outreach and education to tenants/occupants, and procure sufficient service frequency based upon waste generation calculation volumes.

32. Stormwater Control Plan: Permittee shall submit City approved final Stormwater Control Plan (SWCP) that complies with the latest Municipal Regional Stormwater NPDES Permit, including Low Impact Development (LID) Section C3.c.i.(2)(b) measures for harvesting and reuse, infiltration, or evapo-transpiration, for City’s review and approval by the Engineering Division.

33. Photometric Analysis: Permittee shall submit streetlight photometric analysis for City’s review and approval by the Engineering Division along Milpitas Boulevard, Gibraltar Dr, and public sidewalk area that meet the Illuminating Engineering Society of North America (IESNA), RP8, for roadway and sidewalk lighting standards and City standard design guidelines.

34. Recycled Water Cross-Connection Specialist: In order to comply with the California Code of Regulations Title 17 and 22, and for timely plan approval by the California State Water Resources Control Board/Division of Drinking Water (SWRCB/DDW) as well as by South Bay Water Recycling (SBWR), Permittee must hire a certified cross-connection specialist for their consultation as to irrigation water system design and construction phasing. The name and contact information of the certified cross-connection specialist shall be provided on all landscape submittal plans.

35. Submittal Requirements: Permittee to ensure that all plan check submittals are in accordance with City’s submittal check list for each permit type, including but not limited to, payment of permit fees and/or fee deposit at the time of the submittal.

36. Project Job Account/Fee Deposit: Permittee shall open a new PJ account as a deposit to cover the costs for Engineering Department’s services for review and inspection of the project. The amount shall be determined based on the approved City fee schedule at the time of application submittal.

PRIOR TO OFF-SITE PLAN APPROVAL/ENCROACHMENT PERMIT ISSUANCE The following conditions shall be addressed as part of the off-site improvement plan review and shall be met prior to encroachment permit issuance, unless otherwise approved by the City Engineer. (E)

Page 208 of 1283 ends

37. Public Improvement Design Standards: All public improvements shall be designed and constructed in accordance with all applicable public improvement design standards, including but not limited to:
a. Milpitas Design Guidelines: (https://www.milpitas.gov/317/Land-Development-Procedures- Guidelines);
b. Standard details and specifications: (https://www.milpitas.gov/333/Standard-Details- Specifications);
c. Americans with Disabilities Act (ADA) requirements, where applicable.

38. Improvement Agreement and Securities: Permittee shall execute an Improvement Agreement and provide improvement securities in accordance with MMC Title XI, Section 17, and submit all other supplemental documents as stipulated in the Improvement Agreement (such as certificate of insurance).

39. Sanitary Sewer Calculations: Permittee shall submit a completed “Sewer Needs Questionnaire” form and sanitary sewer calculations to justify lateral size design, allocation of discharge for each of the lateral, and impact to the existing main. Permittee shall be responsible to implement any necessary improvements if there is any identified deficiency to the existing main as a result of the project.

40. Storm Drain Design: Permittee shall submit storm drain hydrology and hydraulic calculations based upon a 10-year storm event to justify the size of the storm drain lateral flowing full, without surcharging the main line pipe, and to be reviewed and approved by the Engineering Division.

41. Domestic Water and Fire Service Calculations: Permittee shall submit potable water and fire service calculations to confirm adequacy of lateral size, pressure and flow, to be reviewed and approved by the Engineering Division and Fire Department. Hydraulic modeling analysis by the City and paid by the Permittee may be required as needed. Permittee shall be responsible to implement any necessary improvements if there is any identified deficiency to the existing main as a result of the project.

42. Specific Improvements: In addition to standard public improvements required under Milpitas Municipal Code (MMC) Title XI, Chapter 1, Section 7, Permittee shall install other specific improvements listed below including incidental improvements as required by the City as part of the encroachment permit.
a) Installation of separate water service tap and meter for each of the following services:
residential, non-residential, irrigation, and fire.
b) Installation of separate utility service lines (domestic water, fire service, sanitary sewer) for non-residential.
c) Installation of radio-transmitted water meters with a meter antenna, any repeaters or transmitters as needed with dedicated power supplies at no cost to the City at locations acceptable to the City to ensure accurate and timely reception of meter readings. Permittee shall execute a recorded instrument providing dedicated space, access rights and dedicated power supplies to the City for operation/maintenance/repair/replacement of subject radio antenna.
d) Installation of full street width 3-inch Asphalt Concrete (AC) grind and overlay (G&O), with a 3-inch base repair on Gibraltar Dr. Including the intersection of Gibraltar Dr and South

Page 209 of 1283 ends

Milpitas Blvd., and full street width crack and slurry seal with base repairs on South Milpitas Blvd, along the project frontage limits.
e) Installation of ADA-compliant curb ramps at two intersections along South Milpitas Blvd., Ames Ave., and Gibraltar Dr., and sidewalk along the project frontage, ensuring compliance with the latest ADA standards.
f) Remove curb ramp at southeast corner of Gibraltar Dr. & S. Milpitas Blvd. intersection and replace it with City standard sidewalk.
g) The crosswalk on south leg of the Gibraltar Dr. and S. Milpitas Blvd. intersection should be closed due to non-ADA compliant and a sign combination of R9-3 & R49 (CA) shall be installed on southwest corner of the intersection
h) Installation of street trees along the project frontage. The locations, spacing of street tree and tree species shall be in compliance with applicable City standards and details. i) Installation of a 36-strand fiber optic cable within the existing SIC conduit from Yosemite Dr to the Gibraltar Dr intersection along South Milpitas Blvd, or wireless Signal Interconnect (SIC), to enhance connectivity and improve traffic flow along the corridor. Additionally, implementation of a wireless SIC connection between the Gibraltar Dr and Garden St intersection. This is necessary to ensure better traffic flow thru proper connection to and communication from City owned Advance Traffic Management System (ATMS). City to confirm make and model of wireless SIC or type of Fiber optic cable at later time. j) Installation of a new traffic cabinet with new traffic signal equipment at the Ames Ave and South Milpitas Blvd intersection, along with battery backups. Removal and replacement of any required existing traffic signal equipment related to traffic signal communication only at Gibraltar Drive and South Milpitas Blvd. intersection, to ensure efficient and uninterrupted traffic flow along the corridor. City to confirm the make and model of the traffic signal equipment at later time.
k) Installation of a new Rectangular Rapid Flashing Beacon (RRFB) to replace the outdated and non-functioning RRFB at its existing location along Gibraltar Dr. City to confirm make and model of the RRFB at later time.
l) Installation of video detection cameras (VDS) and Accessible Pedestrian Signal (APS) at two intersections along S. Milpitas Blvd. from Ames Ave. to Gibraltar Dr. City to confirm make and model of VDS and APS at a later time.
m) Either install the Video Detection Cameras (VDS) on existing signal pole or install a new traffic signal pole with a mast arm at the northeast corner and replace the two existing poles without mast arms at the Gibraltar Dr and South Milpitas Blvd. intersection. City to confirm the type of pole and mast arm length at later time.
n) Developer to finish an additional street light pole and be delivered to the Public Works Corporation Yard for storage and future use in the event of a pole getting damaged.

43. Abandonment of Existing City Utilities: Permittee shall cap, abandon or remove any unused existing public utilities based upon City’s Abandonment Notes and to the City’s satisfaction.

44. Relocation and Adjustment of Existing Public Utilities: Permittee shall relocate and/or adjust existing public utilities as needed that are in conflict with the proposed improvements.

45. Maintenance Agreement: Permittee shall record a Maintenance Agreement for perpetual maintenance of certain public improvements, such as sidewalk within the 25’ sidewalk easement, mutually agreed between the City and the Permittee.

Page 210 of 1283 ends

46. Water Service Agreement: Permittee shall complete a water service agreement to obtain water service.

47. Encroachment Permit: Prior to any work in the public right-of-way and/or public easement, obtain an encroachment permit with insurance requirements for all public improvements including a traffic control plan per the latest California Manual on Uniform Traffic Control Devices (MUTCD) standards to be reviewed and approved by the Engineering Division.

48. Pothole Encroachment Permit: Due to multiple new utility service connections on arterial/collector streets, Permittee shall pothole and verify all potential utility crossing conflict as part of the public improvement plan during the design stage.

PRIOR TO BUILDING PERMIT ISSUANCE
The following conditions shall be addressed during the building plan check process and shall be met prior to any building permit issuance (except demolition permit and rough grade permit), unless otherwise approved by the City Engineer. (E)

49. Easements on the Building Permit Plans: Permittee shall depict all existing easements to remain based upon current preliminary title report and depict new easements on applicable building permit plans.

50. Concurrent Off-site Plan Reviews: Permittee shall submit separate off-site improvement plans for City’s review and approval by the Engineering Department.

51. Abandonment/Quitclaim Easements: Permittee shall abandon/quit claim existing easements that are in conflict with or unnecessary for the project.

52. Stormwater Facility Operation & Maintenance Plan: Permittee shall incorporate design details into applicable construction plans in accordance with City-approved SWCP. Permittee shall also submit Stormwater Facility Operation & Maintenance Plan that describes operation and maintenance procedures needed to ensure that treatment Best Management Practices (BMPs) and other storm water control measures continue to work as intended and do not create a nuisance (including vector control).

53. Stormwater Management Facilities O&M Agreement: Permittee shall execute and record a Stormwater Management Facilities Operation and Maintenance (O&M) Agreement associated with the SWCP O&M Plan, including perpetual maintenance of treatment areas/units, as reviewed and accepted by the Engineering Division. The subject O&M Agreement shall be referenced in the Covenants, Conditions and Restrictions (CC&Rs), if applicable.

54. Water Supply and Force Majeure: The City reserves the right to suspend the issuance of building permits in case of an emergency declaration of water supply in the case of a major catastrophic event that restricts City’s assurance to provide water supply.

55. Recycled Water Approval: Permittee shall use recycled water for landscape irrigation purpose, except for the interior courtyard/podium areas within the building footprint where the potable water shall be used for irrigation. Permittee shall comply with California Code of Regulations (CCR), Title 22, Division 4, Chapter 3, titled “Water Recycling Criteria”, CCR, Title 17, Division

Page 211 of 1283 ends

1, Chapter 5, Subchapter 1 titled “Drinking Water Supply” and all other recycled water regulations as listed under the publication titled “California Department of Public Health Regulations Related to Recycled Water June 18, 2014”. Permittee shall obtain approval from the California State Water Resources Control Board/Division of Drinking Water, SBWR and the City for recycled water design, including but not limited to on-site irrigation design, based upon SBWR Guidelines and City of Milpitas Supplemental Guidelines. All landscape plants shall be compatible with recycled water.

56. Water Efficient Landscapes: Permittee shall comply with Milpitas Municipal Code Title VIII, Chapter 5 (Water Efficient Landscapes) for landscape design, including but not limited to, providing separate water meters for domestic water service and irrigation service and providing applicable landscape documentation package.

57. Solid Waste and Recycling Facility Design: Permittee shall comply with all applicable City design guidelines/details associated with haul route, turning radius, vertical and horizontal clearance, trash enclosure, staging area, storage area, etc.

58. Recycling Report Prior to Demolition Permit Issuance: Permittee shall submit Part I of a Recycling Report on business letterhead to the Building Department, for forwarding to the Engineering Division for review and approval. The report shall describe the following resource recovery activities:
a) What materials will be salvaged.
b) How materials will be processed during demolition.
c) Intended locations or businesses for reuse or recycling. d) Quantity estimates in tons (both recyclable and for landfill disposal). Estimates for recycling and disposal tonnage amounts by material type shall be included as separate items in all reports to the Building Division before demolition begins.

Permittee shall make every effort to salvage materials for reuse and recycling and shall comply with the City’s demolition and construction debris recycling ordinance.

59. Recycling Report Prior to Building Permit Issuance: Permittee shall submit Part II of the Recycling Report to the Building Department, for forwarding to the Engineering Division. Part II of the Recycling Report shall be supported by copies of weight tags and/or receipts of “end dumps.” Actual reuse, recycling and disposal tonnage amounts (and estimates for “end dumps”) shall be submitted to the Building Department for approval by the Engineering Division prior to inspection by the Building Department.

60. Development Fees: Permittee shall pay the following development fees. The information listed in items “a” through “e” are based upon current fee rates; however, those fee rates are subject to change. The exact fee amount shall be determined at the time of building permit fee payment. a) Water connection fee at $1,164/unit for residential and $5.97/gpd for commercial, based upon increased water usage.
b) Sewer connection fee at $1,406/unit for residential and $8.52/gpd for commercial, based upon increased average wastewater flow.
c) Wastewater Treatment Plant fee per MMC VIII, Chapter 2, Section 7.04. d) Calaveras Boulevard Widening Traffic Impact fee per Resolution No. 7894.

Page 212 of 1283 ends

e) 3.8% of applicable fees in accordance with City Resolution No. 8969 as Permitting Automation Fee.

61. Mailboxes: The Permittee shall coordinate with US Postal Services regarding placement of required mailboxes. Mailbox location shall not be on public street frontages and shall be approved by City and US Postal Services prior to building permit issuance. Mailbox locations shall be shown on the improvement plans and Permittee shall submit a letter to the City’s Land Development Engineering Section from the Postmaster approving the location of the mailbox.

Structures to protect mailboxes may require Building, Engineering and Planning Department review.

DURING CONSTRUCTION
The following conditions shall be complied with at all times during the construction phase of the project, unless otherwise approved by the City Engineer. (E)

62. Dewatering: If dewatering is needed during construction, Permittee shall obtain a Short-Term Industrial Wastewater Permit from the San Jose/Santa Clara Regional Wastewater Facility for discharging the groundwater to a sanitary sewer system.

63. On-site Recycled Water Coordination: Permittee’s cross-connection specialist shall coordinate the phasing of the construction; facilitate the cross-connection testing in order to minimize the impact for occupied buildings during cross-connection testing; sign-off before the water meter set; coordinate on-site construction inspection; complete the site inspection; fill out required paperwork/questionnaire; and provide them to the City for forwarding to SBWR. Developer shall notify SBWR 7 days in advance to schedule attendance of SBWR inspector during Cross- Connection Test.

64. Prohibition of Potable Water Usage: Permittee shall use recycled water for construction purposes, including dust control and compaction. Permittee shall comply with MMC VIII-6-5.00 and 6-6.00 where potable water usage is prohibited, unless otherwise approved by the City Council.

65. Construction Staging and Employee Parking: Permittee shall place all construction related materials, equipment, and arrange construction workers parking on-site and not located in the public right-of-ways or public easements.

66. Water Shut-down Plan: Permittee shall provide a water shut-down plan at least seven days in advance of the shut-down in coordination with the Engineering Inspector and notify affected property owners/tenants when cut-in tee(s) is/are required.

PRIOR TO FIRST OCCUPANCY
The following conditions shall be met prior to issuance of a certificate of occupancy of the approved project, unless otherwise approved by the City Engineer.

67. Completion of Public Improvements: Permittee shall complete all public improvements, including but not limited to S. Milpitas Boulevard and Gibraltar Dr. frontage improvements including pavement restoration, signing and striping, concrete work, stormwater treatment facilities, and traffic signal modifications as shown on City approved plans.

Page 213 of 1283 ends

68. Grant deed shall be revised to state Property Owner/Developer shall maintain Public Sidewalk around project frontage.

69. Landscape Certificate of Completion: Permittee shall submit a Certificate of Substantial Completion that complies with the Milpitas Municipal Code Water Efficient Landscapes ordinance.

70. Certificate of Cross-Connection: Permittee shall ensure that the cross-connection specialist complete the required recycled water construction inspection checklist, cross connection test results and any special inspection checklist as required by SBWR and forward them to the City.

71. Record Drawings: Permittee shall submit record drawings in Full size hard copy, AutoCAD, TIFF, and PDF formats for City records. Record drawings shall include all public improvements.

Additionally, if the project uses recycled water, the permittee shall also submit record drawings of on-site irrigation facilities.

72. Private Job (PJ) Balance: Permittee shall pay for any remaining balance from the Private Job deposit.

OFFICE OF BUILDING SAFETY

CONDITIONS OF APPROVAL

73. Compliance with California Code of Regulations. The Project shall comply with the requirements of the Office of Building Department and the California Code of Regulations Title 24 and the Milpitas Municipal Code as adopted by the City. Building permits shall be submitted to and approved by the Building Safety and Housing Department prior to start of construction. All California Code of Regulations Title 24 and Milpitas Municipal Code requirements applicable at the time of building permit application must be met in advance of any building permit approvals or related construction. Changes to the site plan and/or building plan require review and approval by the Office of Building Safety.

FIRE DEPARTMENT

CONDITIONS OF APPROVAL

The plans approved by the City Council, Planning Commission, and/or the Planning permit process are not building construction plans and have not been reviewed nor approved for conformance to the California Building Code (CBC), California Fire Code (CFC) and the Milpitas Municipal Code (MMC).

Do not consider this review as a final review for building construction plans approved by the Fire Department. Building construction plans must be submitted for review and approval before construction is to commence. The following notes are a general list of the applicable code requirements (2022 Edition) and are provided to assist with the building permit process. Please note that these are not all inclusive.

All applicable Building, Fire and Municipal Code requirements must be met in advance of any building permit approvals or related construction.

74. Technical Assistance: To determine the acceptability of technologies, processes, products, facilities, materials, and uses attending the design, operation or use of a building or premises subject to inspection by the Fire Code Official, the Fire Code Official is authorized to require the

Page 214 of 1283 ends

owner or agent to provide, without charge to the jurisdiction, a technical opinion(s), plan review(s) and/or report(s). CFC Section 104.8.2

75. Electronic Documents: The Fire Code Official may require electronic base documents for all construction documents and operational permits. The Fire Code Official shall designate the software base format for the electronic documents. CFC Section 106.1.1, added by MMC Section V-300-2.28

76. Fire Department Access: Fire Department apparatus and staff access shall be provided to all buildings and site. Detailed review will be done during construction permit process. The plans submitted appear to be in general conformance with the requirements. Final design shall meet the requirements listed below. CFC Section 503

76.1 Minimum Number of Fire Apparatus Access Points: A Minimum of two independent and approved (approved by the Fire Code Official) means of fire apparatus access shall be provided for the site. Buildings or facilities exceeding 30 feet (9144 mm), or three stories in height, or 50,000 square feet (5760 m 2) shall be provided with at least two means of fire apparatus access for each structure. CFC, Section D104.1, adopted and amended by MMC V-300-2.170

76.2 Fire Apparatus Clearance: Fire apparatus access roads shall provide a minimum clear width of 26 feet. Only conditions with 26 feet roads are applicable. This requirement is for the use and function of a fire ladder apparatus. CFC, Appendix D, Sections D103.1 and D105.2, adopted and amended by Milpitas Municipal Code. MMC V-300-2.169 and 2.172

76.3 Timing of Installation and Serviceability of Fire Protection Elements: When fire apparatus access roads or a water supply for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction.

Combustible construction shall not begin until water mains and hydrants are operational and fire apparatus access roads are installed (paved). CFC Section 501.4

76.4 Fire Apparatus Access: Fire apparatus access shall extend to within 150 feet of all portions of exterior walls of the building/structure per the California Fire Code Section 503.1.1. When there is a dead-end condition, means for fire apparatus turn-around shall be provided.

76.5 Turning Radius: Fire apparatus access roads shall meet the Milpitas Fire Department turning radii guidelines and shall provide continuous apparatus travel. Turning radii for fire apparatus access roads shall be a minimum net clearance of 48 feet 6 inches for the outside radius and 28 feet 0 inches for the inside radius. The layout for the outside and the inside radius shall be from the same reference point (center). CFC Section 503.2.4

76.6 Adjacent Access Rights: No source of access from lands adjoining a property to be developed shall be considered fire apparatus access roads, unless there is obtained the irrevocable and unobstructed rights and recorded as an ingress/egress access easement with the Country of Santa Clara. CFC Section 503.7, added by MMC V-300-2.51

76.7 Fire Access Road Materials and Load Bearing Requirements: Fire access roads shall be paved (concrete and/or asphalt cement, or other concrete type pavement approved by the Fire

Page 215 of 1283 ends
← All documents from this meeting