PLAYGROUND PROTECTIVE SURFACING 32 18 16
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
b. A llow cushion course to cure for sufficient time so that indentations are not left in the cushion course from applicator foot traffic or equipment.
c. Do not allow foot traffic or use of the cushion course surface until it is sufficiently cured.
5. Primer Application: Using a brush or short nap roller, apply primer to the cushion course perimeter and any adjacent vertical barriers such as playground equipment support legs, curbs or slabs that will contact the surfacing system at the rate of 300 ft2/gal.
6 . Wear Course Installation:
a. Using a hand trowel, install wear course at a consistent density of 58 pounds, 9 ounces per cubic foot to a nominal thickness of 1/2 inch.
b. Allow wear course to cure for a minimum of 48 hours. c. At the end of the minimum curing period, verify that the wear course is sufficiently dry and firm to allow foot traffic and use without damage to the surface.
d. Do not allow foot traffic or use of the surface until it is sufficiently cured.
3.5 CLEAN-UP
A. Upon completion of the work under this section, remove immediately all surplus materials, rubbish and equipment associated with or used in the performance of this work. Failure to perform such clean-up operations shall be considered adequate grounds for having the work done by others at the Contractor’s expense.
3.6 PROTECTION
A. Protect the installed playground protective surfacing from damage resulting from subsequent construction activity on the site.
3.7 COMPLIANCE
A. Prior to its first use, the poured-in-place rubber surfacing shall be tested in accordance with ASTM F3313 by a Certified Playground Safety Inspector who shall certify in writing that the installed surfacing meets ASTM F1292.
B. Any test results that do not meet the requirements in ASTM F1292 shall require the installer to repair the failed test area and have the entire play area retested as
PLAYGROUND PROTECTIVE SURFACING 32 18 16
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
stated above. All costs for initial testing, corrections, and re-testing shall be paid f
or by the Contractor.
END OF SECTION 32 18 16
METAL AND HARDWARE 32 31 19
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
SECTION 32 31 19 METAL AND HARDWARE
P
ART 1 – GENERAL
(See also General Conditions, Special Conditions, and General Requirements)
1.1 SCOPE
A. Furnish and install all metal work as shown on the plans and as specified herein including, but not necessarily limited to, the following:
1. Play area fence
2. Play area gate
3. Miscellaneous metal fasteners
B. Related work specified elsewhere:
1. Site Concrete – Section 32 13 13
1.2 STANDARDS
A. The following standards are hereby made a part of this Section and miscellaneous metal work shall conform to the applicable requirements therein except as otherwise specified herein or shown on the plans. Nothing contained herein shall be construed as permitting work that is contrary to code requirements or governing rules and regulations.
1. Section 75 “Miscellaneous Metal” of the Department of Transportation Standard Specifications (DTSS), latest edition.
2. Steel Structures Painting Council Surface Preparation Specifications, Vol. 2, Painting Manual.
1.3 SHOP DRAWINGS
A. Submit shop drawings where required by the technical specifications or on the plans for:
1. Play area fence, including gate posts, brackets, rails and fittings
2. Play area gate and hardware, including gate swing direction B. Shop drawings shall show dimensions, sizes, thicknesses, gauges, weights, finishes, joining, attachments, and relationship of work to adjoining construction.
Include plans, elevations, sections, and other required installation and operational clearances. Include details of post anchorage, attachment and bracing. Where
METAL AND HARDWARE 32 31 19
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
concrete or other materials must be set to exact locations to receive work, furnish a
ssistance and direction necessary to permit other trades to properly locate their work. Where welded connectors or concrete inserts are required to receive work, shop drawings shall show exact locations required, and all such drawings shall be furnished to the trades responsible for installing the connectors or inserts. Catalog work sheets showing illustrated cuts of item to be furnished, scale details, and dimensions may be submitted for standard manufactured items.
PART 2 – PRODUCTS
2.1 FASTENINGS
A. Intent of Drawings: The drawings are intended to show the number, size, and spacing of nails, bolts, and screws, etc., required for structural strength. If any particular joint is not shown on the drawings, it shall be provided with bolts, screws, and/or nails, as required to be consistent with the fully detailed joints, and shall be subject to the approval of the City’s Representative.
B. Furnish all hardware required for fastenings, as shown on the plans, and as specified herein, and as required to complete the work. All fasteners shall be hot- dip galvanized. Fasteners shall include, but not be limited to, the following:
1. Nails: Unless otherwise noted, nails shall be hot-dipped 2 oz./s.f. common wire of adequate size for type of fastening, ASTM 153.
2. Bolts: Shall be machine bolts, lag bolts, or carriage bolts of structural grade steel conforming to ASTM A 153, of sizes indicated on the plans. Anchor bolts shall have cut threads.
3. Washers: Shall be of standard malleable iron, ASTM 153.
4. Lag Screws: Shall be of structural grade steel, and shall be hex headed wherever possible, ASTM 153.
5. Galvanizing:
a. All ferrous metal fabrications shall be hot-dipped galvanized per ASTM A 153. Fabrications to be painted shall be acid etched prior to painting. Galvanizing for iron and steel hardware shall be in accordance with ASTM 153.
b. If necessary, the threads of nuts shall be re-tapped after galvanizing. Any damaged zinc coatings shall be repaired with galvanizing repair compound.
2.2 PLAY AREA FENCE AND GATE
METAL AND HARDWARE 32 31 19
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
A. S hall be wire mesh fence and gate, Elite Double Wire series, 4’ high C-EL48 pre- fabricated welded wire mesh fence system as manufactured by Omega II Fence Systems, as available from MJB Corporation, 15408 Doolittle Road, Grass Valley, CA 95949, or approved equal.
B. Provide gate hardware, latches, hinges, and kick plate as required to meet CBC Chapter 11B-404. Hinges shall be heavy duty, exterior grade, each rated for minimum 300 lbs load.
C. Posts: Shall be cold rolled 1008 grade steel to meet ASTM A500 and ASTM A787 and the following maximum horizontal loads, length as required for embedment mount.
1. 11 ga. Thick or less: Zinc coated (pre-galvanized process) with a minimum of 0.9 oz/ft2 as per ASTM A653 Grade 90.
2. 1/8 in or more: Coated with a minimum of 2.3 oz/ft2 (705 g/m2) zinc (hot- dip galvanizing) in conformity with ASTM A123 Grade 100.
D. Polyester Coating: Shall be minimum 4 mils 0.5 oz/ft2 zinc in conformity with ASTM A641 Class 1 and applied by an electrostatic process. Coating shall cover all surfaces of the wire and post sections. Color shall be standard black, 30% gloss.
E. Mesh: Vertical wires shall be 6-gauge (4.88 mm) diameter and placed between two horizontal wires of 4 gauge (5.72 mm) diameter to form rectangular mesh openings 1-15/16”x7-7/8”. Cold rolled annealed wire made of AISI Grade 1018 steel with tensile strength of at least 75,000 psi (515 Mpa) in accordance with ASTM A853. Wires at the top and bottom of panels shall be cut flush.
2.3 MATERIALS
A. Steel Fabrications
1. Steel tube: Cold-formed, conforming to ASTM A 500, Grade B.
2. Steel plates, shapes, bars: Conforming to ASTM A 36.
3. Concrete inserts: Malleable iron, ASTM A 47, or cast steel, ASTM A 27, inserts, with steel bolts, washers and shims; hot-dipped galvanized.
4. Anchors and inserts: Furnish inserts and anchoring devices to be built into other work for installation of miscellaneous metal items. Coordinate delivery to job site to avoid delay. Use non-ferrous metal or hot-dipped galvanized anchors and inserts for exterior resistance. Use toothed steel
METAL AND HARDWARE 32 31 19
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
or lead expansion bolt devices for drilled-in-place anchors. Furnish inserts, a
s required, to be set into concrete or masonry work.
5. Fasteners: Use fasteners made of the same basic metal as the fastened metal, unless otherwise indicated. Do not use metals which are corrosive or incompatible with materials joined. Provide exposed fasteners, if any, which match finish of fastened metal, unless otherwise indicated.
PART 3 – EXECUTION
3.1 GENERAL
A. Verify all measurements on-site prior to ordering materials.
B. Coordinate all metal work with adjoining work for details of attachment, fitting, etc. Do all cutting, shearing, drilling, punching, threading, tapping, etc., required for miscellaneous metal or for attachment of adjacent work. Drill or punch holes, do not use a cutting torch. Shearing and punching shall leave true lines and surfaces.
C. Conceal all fastenings where practicable. Thickness of metal and details of assembly and supports shall give ample strength and stiffness. Form joints exposed to weather to exclude water.
D. Make all permanent connections in ferrous metal surfaces using welds where at all possible. Do not use bolts or screws where they can be avoided. Re-galvanize all welds.
E. Provide all lugs, clips, anchors and miscellaneous fastenings necessary for the complete assembly and installation.
F. Set all work plumb, true, rigid, and neatly trimmed out.
G. Where items must be incorporated or built into adjacent work, deliver them to the trade that is responsible for proper location of such items.
3.2 WELDING
A. Perform all welding in accordance with DTSS Section 75 “Miscellaneous Metal”.
B. Welds shall be made only by operators experienced in performing the type of work indicated.
METAL AND HARDWARE 32 31 19
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
C. W elds normally exposed to view in the finished work shall be uniformly made and shall be ground smooth.
D. Where welding is done in proximity to glass or finished surfaces, such surfaces shall be protected from damage due to welds, sparks, spatter, or tramp metal.
3.3 BOLTED, SCREWED AND RIVETED CONNECTIONS
A. In general, use bolts for field connections only as detailed. Provide washers under all heads and nuts. Draw all nuts tight and nick threads of permanent connections to prevent loosening. Use beveled washers where bearing is on sloped surfaces.
B. Each bolt hole in wood shall be drilled 1/16 inch larger than the bolt diameter.
C. Where screws must be used for permanent connections in ferrous metal, use flat head type, countersunk, with screw slots filled and finished smooth and flush.
3.4 CLEAN-UP
A. Protection and Cleaning: Remove all soiled and foreign matter from finished surfaces and apply such protective measures as required to prevent damage or discoloration of any kind until acceptance of the project.
B. During construction, keep premises as clear as possible of materials and debris, and at the completion of work remove all tools, appliances, materials, and debris from the premises.
END OF SECTION 32 31 19
SITE FURNISHINGS 32 33 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
SECTION 32 33 00 SITE FURNISHINGS
P
ART 1 – GENERAL
(See also General Conditions, Special Conditions, and General Requirements)
1.1 SCOPE
A. Furnish and install all site furnishings as shown on the plans and as specified herein including, but not necessarily limited to, the following:
1. Benches
2. Trash receptacles
3. Removable bollard
4. Entrance sign
5. Exit sign
6. Illuminated exit sign
B. Related work specified elsewhere:
1. Site Concrete – Section 32 13 13
1.2 ACCEPTANCE
A. Prior to the purchase of the items and within ten (10) working days after award of the contract, the Contractor shall supply the City’s Representative with samples of the finishes for approval. No materials for this Section shall be purchased until such approval is granted.
1.3 CERTIFICATION
A. Delivery schedules shall be verified and certified in writing to the City’s Representative within ten (10) working days after award of the contract.
1.4 SUBMITTALS
A. Submit catalog information for items:
1. Bench
2. Trash receptacle
3. Removable bollard
4. Entrance sign
5. Exit sign
6. Illuminated exit sign
SITE FURNISHINGS 32 33 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Bench: Shall be DuMor, model 88 SER PL -3AR, 6’ length, surface mounted, frame shall be powder coated black color, slats shall be “Redwood” colored recycled plastic with centered arm rest, or a pproved equal. Available through Ross Recreation Equipment, 100 Brush Creek Road, Suite #206, Santa Rosa, CA 95404, (707) 538-3800.
B. Trash Receptacle: Shall be Universal Prec ast Concrete, standard trash receptacle with city logo, liner, drain hole, lid and security cable, QCP latte color with smooth finish and standard sealer, or approved equal. Available through Universal Precast Concrete.
C. Removable Bollard: Shall be Bollard Po st, model R-7902, 36 inches in height, powder coated black textured semi gloss, Removable Receiver with Lid mounting style with Brass Padlock, as manufactured by and available from Reliance Foundry, 1 (888) 735-5680, or approved equal.
D. Entrance Sign: Shall be TactileTouch Br aille Sign, 6” x 9”, model SE-2710 with accessible pictogram and tactile touch braille, color 210 black with white text, as available from My Door Sign, www. MyDoorSign.com, (887)-417-6328, or approved equal.
E. Exit Sign: Shall be shall be TactileTouch Braille Sign, 6” x 9”, model SE-1980, Exit Sign with tactile touch braille, color 210 black with white text, vertical orientation, as available from My Door Sign, or approved equal.
F. Illuminated Exit Sign: Shall be model PA100-R-s, 100’ Photoluminescent Exit Sign, 1-sided, color red, as available from The Exit Light Company, (877)-352-3948 www.ExitLightCompany.com, or approved equal.
PART 3 – EXECUTION
3.1 LAYOUT
A. Prior to commencing installation, the Cont ractor shall stake the site furnishing layout and request a review by the City’s Representative to determine adjustments on-site from locations shown on the plans.
SITE FURNISHINGS 32 33 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
3.2 I NSTALLATION
A. All site furnishings shall be installed per the manufacturer's specifications.
END OF SECTION 32 33 00
PLANTING IRRIGATION 32 84 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
SECTION 32 84 00 PLANTING IRRIGATION
P
ART 1 – GENERAL
(See also General Conditions, Special Conditions, and General Requirements)
1.1 SCOPE
A. Furnish and install a complete automatic irrigation system as shown on the plans and as specified herein including, but not necessarily limited to, the following:
1. Water point of connection
2. Trenching and piping
3. Irrigation equipment
B. Related work specified elsewhere:
1. Trenching and Backfilling – Section 31 23 00
2. Landscape Maintenance – Section 32 01 90
3. Landscape Soil Preparation – Section 32 91 13
1.2 QUALITY CONTROL
A. Standards: Unless otherwise shown or specified, all materials and methods shall conform to the most current Section 20-2 “Irrigation” of the State of California Department of Transportation Standard Specifications (DTSS) as they reasonably apply to this work, except for measurement and payment requirements.
B. All irrigation shall be provided and performed in accordance with the current City of Milpitas Standard Specifications and Details. Wherever these plans and the City Standards conflict, the higher quality standard or specification will apply.
C. Reviews: The Contractor shall specifically request the following reviews prior to progressing with the work:
1. Layout of system.
2. Points-of-connection excavation.
3. Trenching and pipe assembly.
4. Coverage adjustment of all heads and valve box installation.
5. Operation of system.
PART 2 – PRODUCTS
2.1 MATERIALS
PLANTING IRRIGATION 32 84 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
A. Q uality: All materials shall be new and the best quality available unless otherwise specified. All materials shall be clearly marked by the manufacturer on all material, containers, or certificates of contents for inspection.
B. Plastic Pipe and Fittings: All mainline pipe shall be Class 315 conforming to ASTM D2241. Unless otherwise noted, all laterals shall be Class 200 PVC pipe conforming to ASTM D2241. Solvent weld fittings, if used, shall be Schedule 40 as called for on details. Solvent for piping shall be as recommended by the manufacturer. All pipe shall be clearly labeled with the manufacturer type and specification numbers.
Recycle water line shall be purple.
C. Control Wire: Type UF, 600 v. insulation, minimum size #14, copper, common to be white, valve control wire to be red or black, U.L. approved for irrigation control use. Splices shall be "Scotch-Lok" seal pack, or approved equal.
D. Valve Boxes: Precast concrete or plastic of type and size indicated. Free of all cracks, chips or structural defects. Boxes located in pavement (asphalt or concrete) and/or subject to vehicular traffic shall be concrete and have heavy duty steel covers. Boxes shall be sized to provide a 4 inch minimum clearance around the irrigation equipment inside the box, excluding all pipes and fittings.
E. Irrigation Equipment: Refer to plans. Water meter and backflow preventer are existing. Any desired substitutions require submittals in duplicate for specific written approval.
F. Thread Sealant: Teflon tape shall be used on metal-to-plastic or plastic-to-plastic pipe threads. Permatex Thread Sealant, part #14H, white in color, shall be used on metal-to-metal pipe threads.
G. Valve ID Tags: All control valves to be labeled with standard yellow valve ID tags, available from Ewing Irrigation, (650) 592-9530, or similar.
PART 3 – EXECUTION
3.1 PREPARATION
A. Grading: The Contractor shall be responsible for installing all irrigation features to their finished grade and at the depths indicated. All rough grading shall be completed before trenching commences.
B. Layout and Trenching: All features of the irrigation system shall be staked and pipe alignments marked prior to trenching for review by the City’s Representative.
PLANTING IRRIGATION 32 84 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
3.2 I NSTALLATION
A. Backfilling: Do not cover joints until the system has been reviewed by the City’s Representative. Backfill with damaging rocks and debris shall not be permitted.
Compact all backfill and eliminate settlement. Previously prepared soil shall be replaced as the top 6 inches of backfill.
B. Fabrication: Snake pipe from side to side when trench exceeds 30 feet in length.
All manifolds shall be neat, orderly, and constructed for ease in maintenance operations. Construct manifolds to allow valve boxes to be parallel to each other and to adjacent walls, walks, curbs, and buildings. Cuts and joints shall be free of burrs, smooth, and minimum in quantity. All pipe above finish grade shall be galvanized unless noted otherwise.
C. Pipelines: All pipelines shown parallel on the drawing may be installed in a common trench. Where pipelines are shown parallel or adjacent to shrub or groundcover areas, they shall be installed in these areas. All changes in depth of pipe shall be accomplished using 45-degree fittings.
D. Testing: Test mainline at 125 p.s.i. for 6 hours. Test and repair as necessary until satisfactory test conditions are obtained.
E. Control Wire: Install control wire in pipe trenches wherever practical. Tape to underside of pipe every 10 feet. Loop wire every 20 feet. Splices shall occur in valve boxes only and shall be accomplished utilizing approved connectors. All wire shall be installed below or level with the bottom of adjacent pipes. All wiring above finish grade shall be enclosed in steel conduit. Splices shall be installed in junction boxes.
F. Adjustments: Adjust all heads for arc, radius, riser height, and distribution for uniform and optimum coverage. Such adjustments shall include nozzle changes without additional cost to City.
G. Finish Grade: Unless otherwise noted, all heads shall be set at finish grade and on double or triple swing joints as called for on the plans. The top of all valve boxes shall be flush with finish grade.
H. Controller: Existing.
3.3 RECORD DRAWING
PLANTING IRRIGATION 32 84 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
A. R egularly update a print of the system and any changes made to the system throughout the project. Features below ground shall be indicated with at least two measurements from surface features such as walks, building, or sprinkler heads.
All changes shall be recorded on this plan before trenches are backfilled. The record drawing shall be completed and submitted to City before final payment is made for work installed.
END OF SECTION 32 84 00
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
SECTION 32 91 13 LANDSCAPE SOIL PREPARATION
P
ART 1 – GENERAL
(See also General Conditions, Special Conditions, and General Requirements)
1.1 SCOPE
A. Furnish and install all landscape soil preparation as shown on the plans and as specified herein including, but not necessarily limited to, the following:
1. Soil testing
2. Import topsoil
3. Topsoil placement
4. Organic amendment
5. Fertilizer
6. Finish grading
B. Related work specified elsewhere:
1. Earthwork and Grading – Section 31 22 00
2. Landscape Planting – Section 32 93 00
1.2 QUALITY CONTROL
A. Reviews: Contractor shall specifically request at least three (3) working days in advance of the following reviews prior to progressing with the work:
1. Completion of rough grading
2. Verification of amendment incorporation depths
3. Finish grade
B. Certification: Written certificates stating quantity, type, and composition, weight and origin for all amendments and chemicals shall be delivered to the City’s Representative before the material is used on the site.
C. Soil Testing: Provide soil samples to Waypoint Analytical, Inc. of Anaheim, (714) 282-8777, for testing in accordance with these specifications. Test results shall be made available to the City’s Representative. Allow sufficient time for testing prior to preparing soil for planting.
1. The following soil tests are required under these specifications:
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
a. N ative Soil: Prior to construction, submit native soil for horticultural soil analysis, consisting of one one-quart samples from the proposed container planting areas. Samples shall be a representative composite taken from several planting areas. b. Import Soil: Prior to construction, submit for horticultural soil analysis: one quart-sized sample of import soil.
c. Pre-Plant: Following amendment and fine grading and prior to installation of plant material, submit for horticultural soil analysis:
one quart-sized sample of in-place topsoil. Sample shall be a representative composite taken from several planting areas.
2. If test results indicate that soils fail to meet the specifications, obtain other sources of import material or re-amend as required. Retest and resubmit until passing results are obtained.
3. Testing costs for initial samples and costs for any additional samples due to non-compliance shall be paid for by the Contractor.
4. No material shall be delivered to the site until the City’s Representative approves the material.
5. The Contractor shall allow for sufficient time for testing prior to construction.
D. Amendment Samples: Provide an analysis of the amendment from a Seal of Testing Assurance (STA) Certified Compost Lab, designated by the U.S.
Composting Council (USCC). Or, send a one-gallon sample of each proposed amendment to Waypoint Analytical, Inc. of Anaheim, for their testing for conformance to this specification.
1. No material shall be delivered to the site until the City’s Representative approves the samples.
2. Testing costs shall be paid for by the Contractor.
3. If an alternate laboratory is used, the laboratory must be STA certified by the USCC, using test methods described in the “Test Methods of the Examination of Composting and Compost” (TMECC) test methods manual.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Import Topsoil: Shall be a homogeneous mineral soil classified as loam, sandy clay loam, or sandy loam with clay content between 15 and 25%. The sum of silt plus
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
clay shall be less than 35%. Import topsoil shall not contain more silt and clay than t
he on-site native soil.
1. Particle size data shall be based upon standard USDA methodology. Of the material falling in the sand category, a minimum of 50% shall fall in the fine sand range .05 - 5.0 mm. Gravel content greater than 2.0 mm shall be less than 15%.
2. Soil chemistry shall be suitable for growing the plants specified. The soil shall be non-saline as determined on the saturation extract. Salinity shall not exceed 3.0 mmhos/cm, boron shall not exceed 1.0 ppm, and the sodium absorption ratio (SAR) shall not exceed 6.0. Soil reaction as determined on a saturated paste shall fall between 5.5 and 7.5.
3. The soil shall be free of organic herbicides, or other growth-restricting chemicals. Contamination may be tested by greenhouse trials using rye grass and radish as test crops using the proposed import soil as substrate.
These trials require 4 to 5 weeks for completion.
B. Fertilizer: Shall be determined from the soils test results. For purposes of bidding only, assume the use of 6-20-20 commercial fertilizer, iron sulfate, and 20-10-5 Best-Pak planting packets by J.R. Simplot Company.
C. Organic Amendment: If recommended by the horticultural soils test, the following materials shall be used as soil amendment.
1. Compost: Shall be Z-Best’s Organic Compost available through Z-Best Composting (408) 846-1574 and shall conform to:
a. Seal of Testing Assurance Program from the U.S. Composting Council.
b. Compost parameters, below:
Property Te
st Method Unit of Measurement Requirement
pH TMECC 04.11-A
Elastomeric pH 1:5 slurry method pH
units 6–8.5
Soluble salts TMECC 04.10-A
Electrical conductivity 1:5 slurry
method
dS/m (mmhos/cm) 0–10
Moisture content TMECC 03.09-A
Total solids & moisture at 70 ± 5 °C
% wet weight basis 30-60
Organic matter
Content
TMECC 05.07-A
Loss-on-ignition organic matter
method (LOI)
% dry weight basis 30–60
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
Property Te st Method Unit of Measurement Requirement Maturity TMECC 05.05-A
Germination and vigor
% relative to positive
control
Seed emergence 80
or above Seedling
vigor 80 or above
Stability TMECC 05.08-B
Carbon dioxide evolution rate
mg CO2-C/g OM per
day
4 or below
Pathogen TMECC 07.01-B
Salmonella < 3 MPN per 4 grams, dry
weight basis
Pass/ Fail
Pass
Pathogen
TMECC 07.01-B
Fecal coliform bacteria < 1,000 MPN
per gram, dry weight basis
Pass/ Fail Pass
Physical
contaminants
TMECC 02.02-C Man-made inert
removal and classification: Plastic,
glass, and metal % > 4 mm fraction
% dry weight basis combined total: <
0.5%
Physical
contaminants
TMECC 02.02-C
Man-made inert removal and
classification: Sharps (sewing needles,
straight pins and hypodermic needles)
% > 4mm fraction
% dry weight basis none detected
Particle size
fine for compost
used as soil
amendment
TMECC 02.02-B Sample sieving for
aggregate Size classification
% dry weight basis Pass 2 inch sieve
98% min.,
Pass 3/8 inch sieve
95% min.
Heavy metals PASS / FAIL mg/kg (ppm), dry
weight basis
All EPA 503 metal
contaminant limits
Carbon:Nitrogen
Ratio
Carbon:Nitrogen ≤25:1
Note: TMECC refers to "Test Methods for the Examination of Composting and Compost," published by the United States Department of Agriculture and the United States Compost Council (USCC). (Table modified from the US Composting Council Landscape Architectural Specifications 2005.)
2. Nitrogen-treated Fir Bark shall conform to:
a. Physical Properties
1) 95% -100% passing, sieve size 6.35 mm (1/4 inch)
2) 80% - 100% passing, sieve size 2.38 mm (No. 8, 8 mesh) 3) 0% - 30% passing, sieve size 500 micron (No. 35, 32 mesh) b. Chemical Properties
1) Nitrogen Content (dry weight basis): 0.4% - 0.6%
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
2) I ron Content: minimum 0.08% dilute acid soluble Fe on dry weight basis
3) Soluble Salts: maximum 3.5 millimhos/cm at 25 degrees C. as determined by saturation extract method
4) Ash: 0 - 6.0%
PART 3 – EXECUTION
3.1 LIMITS AND GRADES
A. Grade Review: Prior to commencing soil preparation operations, Contractor shall request a review by the City’s Representative to verify specified limits and grades of work completed to date and soil preparation work to commence. Complete the rough grading as necessary to round the top and toe of all slopes, providing naturalized contouring to integrate newly graded areas with the natural topography. Finish grading under this Section shall be completed in accordance with the grades indicated on the plans.
B. Grading at Existing Trees: Soil work within the dripline of existing trees shall be performed in accordance with tree protection requirements indicated on the plans and Section 32 01 91 Tree Protection and Pruning.
3.2 TOPSOIL PLACEMENT
A. Depths indicated in this Section are for bidding purposes only. Depth of scarification, height of soil lifts, and depths of incorporation shall be as recommended by the soil testing lab.
B. Soil Moisture: If soils are saturated, suspend soil work operations until the soil moisture drains to below field capacity.
C. Subgrade preparation: Excavate planting areas to the proposed subgrade and remove all construction debris and materials.
1. Do not over excavate compacted subgrades of adjacent pavement or structures.
2. Subgrades shall slope approximately parallel to the finished grade and/or toward the subsurface drain lines as shown on the plans.
3. Scarify or rip subgrade to a depth of 7 inches and protect from compaction.
D. Topsoil Incorporation: Uniformly distribute a 3 inch layer of topsoil and incorporate it into the top 6 inches of subsoil by ripping, scraping, or tilling to mix
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
the subsoil with the topsoil into a homogeneous mixture. Repeat until the total d
epth of topsoil placed is as indicated on the plans. The final layer of topsoil shall be uniformly distributed in the planting areas and compacted in place to 85% compaction.
E. Existing Topsoil to Remain: Except within tree protection zones, in those planting areas where native topsoil is to be left in place, cross rip to a depth of 10 inches.
Then incorporate the amendments to a homogeneously blended soil depth of 6 inches.
3.3 ORGANIC AMENDMENT AND FERTILIZER INCORPORATION
A. Organic amendment: After topsoil placement and compaction, spread organic amendment at a rate of 6 cubic yards per 1000 square feet, unless otherwise specified by the soils test results.
B. Fertilizer: Spread uniformly on top of compost at rates determined by the soils test. For bidding purposes only, assume per 1000 square feet:
1. 30 pounds commercial fertilizer (6-20-20)
2. 10 pounds iron sulfate
a. Note: Iron sulfate should be applied cautiously, avoiding contact with concrete, since permanent staining may result. Any such stained concrete shall be replaced at Contractor’s expense.
C. Incorporate organic amendment and fertilizer into the top 6 inches of topsoil, until homogeneously blended.
3.4 PLANT PITS
A. Plant Pit Preparation: Plant pits shall have their sides and bottoms loosened or otherwise broken to prevent glazed or compacted surfaces, and shall be as shown on the planting detail.
3.5 BACKFILL
A. Backfill Material and Placement: Only unamended soil shall be used beneath the root ball. Cultivate the bottom of plant pits to improve porosity. Backfill around sides of the rootball shall be the amended soil taken from adjacent prepared areas. Spread material excavated from plant pits onto adjacent areas as replacement. Should additional backfill be necessary, a mixture of one third
LANDSCAPE SOIL PREPARATION 32 91 13
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
organic amendment/fertilizer mix and two thirds topsoil may be used for the top 1 2 inches of backfill.
3.6 PLANT PACKETS
A. Packet Quantities: All container plants shall receive plant packets as follows:
Container Size Number of Packets
one-gallon plants one 10-gram packet
five-gallon plants two 10-gram packets
fifteen-gallon plants nine 10-gram packets
24-inch box trees sixteen 10-gram packets
36-inch box trees twenty-four 10-gram packets
1. Space the packets evenly around the root ball in the backfill, 6 - 8 inches from soil surface and 1 inch away from root ball. City’s Representative may require excavation of up to 5% of all plants selected at random for conformance review.
3.7 FINISH GRADING
A. Grading Operations: Finish grade all irrigated planting areas unless otherwise noted, and remove all rocks and clods over 1 cubic inch to a depth of 1 inch below finish grade. All areas shall be smooth and uniformly graded. All erosion damage during the construction period shall be repaired by the Contractor.
B. Finish Grades: Unless otherwise noted, all soil finish grades shall be 1 inch below finish grade of walks, pavements, and curbs.
END OF SECTION 32 91 13
LANDSCAPE PLANTING 32 93 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
SECTION 32 93 00 LANDSCAPE PLANTING
P
ART 1 – GENERAL
(See also General Conditions, Special Conditions, and General Requirements)
1.1 SCOPE
A. Furnish and install all landscape planting as shown on the plans and as specified herein including, but not necessarily limited to, the following:
1. Trees
2. Root barrier
3. Mulch
4. Headerboard
5. Staking
B. Related work specified elsewhere:
1. Landscape Maintenance – Section 32 01 90
2. Landscape Soil Preparation – Section 32 91 13
1.2 REFERENCES
A. Interpretations of plant names and descriptions shall reference the following documents. Where the names or plant descriptions disagree between the several documents, the most current document shall prevail.
1. USDA – The Germplasm Resources Information Network (GRIN) http://www.ars-grin.gov/npgs/searchgrin.html
2. Manual of Woody Landscape Plants, Michael Dirr, Stipes Publishing, Champaign, Illinois, most current edition.
3. New Sunset Western Garden Book, Oxmoor House, most current edition.
B. ANSI American Standard for Nursery Stock
C. Federal, State, and County laws requiring inspection for plant disease and insect control.
D. Nursery and Restoration Guidelines, working group for Phytophthoras in native habitats:
1. http://www.suddenoakdeath.org/welcom-to-calphytos-org- phytopthoras-in-native-habitats/
LANDSCAPE PLANTING 32 93 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
1.3 Q UALITY CONTROL
A. Reviews: The Contractor shall specifically request the following reviews prior to progressing with the work:
1. Plant material approval
2. Plant layout
3. Finish grade
4. Substantial completion
5. Final completion
1.4 SUBMITTALS
A. Plant Material: Within ten (10) working days after award of the contract, the Contractor shall submit notice to the City’s Representative certifying the quantity and species of plant material ordered, the nursery supplying the material, any plant material unavailable at the time, and proposed plant substitutions. No plants shall be ordered or delivered prior to written acceptance by the City’s Representative.
B. Mulch: Name of supplier and one quart-sized sample.
C. Certificates: All plant material shall meet the specifications of Federal, State, and County laws requiring inspection for plant diseases and insect infestations.
Inspection certificates required by law shall accompany each shipment, invoice, or order of stock, and when such plants arrive at the site of work, the certificate of inspection shall be filed with the City’s Representative.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Nomenclature and Labels: Plant botanical names shall conform to current literature noted in Section 1.2 above. All plants of each clone, species, and cultivar shall be delivered to the site labeled with their full botanical names. Every plant species shall be labeled with no less than one label for every ten plants of a species.
B. Quality: The minimum quality of all plant material shall conform to prevailing published specifications of the California Association of Nurserymen and the American Association of Nurserymen’s American Standard for Nursery Stock
LANDSCAPE PLANTING 32 93 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
unless otherwise indicated. Additional specifications shall be indicated on the p
lans.
C. Quantities: The quantities shown on the plant list and in labels are for the City’s use and are not to be construed as the complete and accurate limits of the contract. The Contractor shall furnish and install all plants shown schematically on the plans. Any unlabeled plants shall be considered as the smaller size shown for that type on the plans.
D. Root Systems: All container-grown stock shall be grown in its container for at least 6 months prior to its planting. Contractor shall allow one percent of the quantity of plants for removal and inspection. Any plant material, within one year following the final acceptance of the project, determined by the City’s Representative to be defective, restricted, declining, or otherwise deficient due to abnormal root growth, shall be replaced by Contractor to the equal condition of adjacent plants at the time of replacement.
E. Trees: All trees shall have straight trunks of uniform taper, larger at the bottom.
Trunks shall be free of girdling roots or damaged bark, with all minor abrasions and cuts showing healing tissue. Sucker basal growth and sucker lateral growth shall be removed and treated to eliminate re-sprouting. Normal lower side branching shall remain. Trees that are unable to stand upright without support shall be rejected.
F. Health: Foliage, roots, and stems of all plants shall be of vigorous health and normal habit of growth for its species. All plants shall be free of all diseases, insect stages, burns, or disfiguring characteristics.
G. Untrue Species: All plant material, within two years following the final acceptance of the project, that is determined by the City’s Representative to be untrue to the species, clone, and/or variety specified, shall be replaced by the Contractor, to the equal condition of adjacent plants at the time of replacement.
H. Mulch: Except as otherwise noted below, mulch shall be walk-on bark, free of disease, invasive weeds and seeds. Maximum 3” grind. Available from Redi-Gro (800) 654-4358, or Lyngso Garden Materials, 345 Shoreway Road, San Carlos, CA 94070, (650) 364-1730, or approved equal.
I. Headerboard: Shall be Benda Board recycled plastic landscape edging with associated stakes, color shall be Redwood, as available from Epic Plastics, or
LANDSCAPE PLANTING 32 93 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
approved equal. Stake color to match headerboard color. Install in locations sh
own on the plans, per the manufacturer’s specifications.
PART 3 – EXECUTION
3.1 GENERAL
A. Plant Material Approvals: Before planting operations commence, all or a representative sampling of plant material shall be reviewed at the site by the City’s Representative. Defective plants installed without such review shall be removed from the site upon request by the City’s Representative and an acceptable plant shall be substituted in its place.
B. Storage and Handling:
1. Plant materials shall be protected and maintained in good condition. Bare root and balled materials shall be watered regularly and placed in a cool area. Plant material shall be protected at all times from animal damage, vandalism, drought damage, wind damage, frost damage, toxic irrigation water, or any other condition that would damage or reduce the viability of the plants. Plants shall be kept moist at all times and shall be completely watered 12 hours or less before planting and shall be moist when installed.
C. Layout: Only those plants to be planted in any single day shall be laid out.
Locations of all plants shall be reviewed prior to planting. Plants installed without this review shall be transplanted as directed by the City’s Representative.
D. Protection of Plants: Maintain all plant material in a healthy growing condition prior to and during planting operations. The Contractor shall be responsible for vandalism, theft, and damage to plant material until the commencement of the maintenance period.
E. Root Systems: The Contractor shall be responsible for inspection of all root systems on plant materials. Inspection shall include, but not be limited to, checking for rootbound stock, encircling roots at the perimeter of the container, evidence of girdling roots, and other defective root conditions. Such inspections shall include the complete removal of soil from one percent of plant material containers, or at least one plant from each nursery and each plant type. The Contractor shall cut defective or potentially defective girdling, rootbound, and encircling roots, and spread the root system into the surrounding backfill. Plants with excessively defective root systems shall be rejected by the Contractor.
LANDSCAPE PLANTING 32 93 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
F. P runing: The Contractor shall not prune plant material without the specific approval of the City’s Representative. Plants pruned without approval shall be replaced by the Contractor, if required.
G. Basins: Construct basins as necessary to water plants. Remove basins from all plants under a permanent irrigation system prior to final inspection and finish grade the planting area. Basins for plants to be hand-watered shall remain in place. Basin bottoms shall drain away from the plant stem.
H. Staking: All trees shall be staked as shown on the plans with stakes driven securely into existing soil and aligned with the trunk and perpendicular to the direction of prevailing winds. A minimum of two figure-eight rubber tree ties is required per stake.
I. Plant Pits, Backfill and Finish Grading: See Landscape Soil Preparation Section 32 91 13 for materials and installation requirements.
J. Clean-up: After completion of all operations, remove all trash, excess soil and other debris. All walks and pavement shall be swept and washed clean, leaving the entire area in a neat, orderly condition.
END OF SECTION 32 93 00
SITE DRAINAGE UTILITIES 33 40 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
SECTION 33 40 00 SITE DRAINAGE UTILITIES
P
ART 1 – GENERAL
(See also General Conditions, Special Conditions, and General Requirements)
1.1 SCOPE
A. Furnish and install all storm drain lines and appurtenances as shown on the plans and as specified herein including, but not necessarily limited to, the following:
1. Catch basin
2. Junction box
3. Storm drain cleanout
4. Solid drainline
5. Perforated drainline
B. Related work specified elsewhere:
1. Earthwork and Grading – Section 31 22 00
2. Trenching and Backfilling – Section 31 23 00
3. Site Concrete – Section 32 13 13
1.2 STANDARDS
A. Unless otherwise specified or shown, all materials and methods shall conform to the appropriate current sections of the State of California, Department of Transportation Standard Specifications (DTSS) as they reasonably apply to this work, except for measurement and payment requirements.
1.3 TOLERANCES
A. Tolerances for pipe trenches, pipe placement, catch basins, and area drains shall be as specified by DTSS. No combination of high and low tolerances that compromise the lines and grades as shown will be permitted.
1.4 REVIEWS
A. 24 hours prior to placement of backfill above the pipe bedding, the City’s Representative shall be notified by the Contractor, and shall be allowed a reasonable amount of time to inspect the placement of the pipe and pipe bedding.
1.5 RECORD DRAWINGS
SITE DRAINAGE UTILITIES 33 40 00
Sinnott Park Playground Renovation
23003_SP_SPECS_Master
© copyrighted 2026 Callander Associates
Landscape Architecture, Inc.
A. T he Contractor shall maintain a daily log of on-site installation and changes from the Contract Documents on a set of prints provided to the Contractor by the City for record purposes. A clearly legible and detailed print of said log, acceptable to the Inspector, shall be submitted to the City prior to final payment.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Drain Pipe (solid and perforated): PVC sewer pipe, SDR-35, size as indicated on the plans, conforming to ASTM D3034 for 4 inch to 15 inch diameter size, and ASTM F679 for 16 inch to 24 inch diameter size.
B. Drain Rock: 3/8 inch pea gravel.
C. Catch Basin and Junction box: Christy V-64, solid steel lid, with appropriate extensions to extend 2 inches below invert elevations as shown on the plans.
D. Geotextile Fabric: Mirafi 140N non-woven geotextile fabric, or approved equal. As available from SiteOne Landscape Supply, 1145 N. 13th St., San Jose, CA 95112, (408)-295-3376.
PART 3 – EXECUTION
3.1 TRENCH EXCAVATION
A. Excavation of pipe trenches shall conform to DTSS Section 19-3 “Structure Excavation and Backfill” and Section 31 23 00 Trenching and Backfilling of these specifications.
3.2 INSTALLATION
A. Pipes, catch basins, and appurtenances shall be installed to the lines and grades shown and in accordance with applicable sections of the DTSS.
END OF SECTION 33 40 00
Copyright © 2025 by ENGEO Incorporated. This document
may not be reproduced in whole or in part by any means
whatsoever, nor may it be quoted or excerpted without the express written consent of ENGEO Incorporated.
SINNOTT PARK PLAYGROUND
MILPITAS, CALIFORNIA
GEOTECHNICAL EXPLORATION
SUBMITTED TO
Ms. Marie Mai
Callander Associates Landscape Architecture, Inc.
2025 Gateway Place, Suite 285
San Jose, CA 95110
PREPARED BY
ENGEO Incorporated
June 3, 2025
Revised December 2, 2025
PROJECT NO.
27375.000.001
GEOTECHNICAL
ENVIRONMENTAL
WATER RESOURCES
CONSTRUCTION SERVICES
COASTAL/MARINE GEOTECHNICS
2350 Mission College Boulevard, Suite 800 Santa Clara, CA 95054 (408) 574-4900 [email protected] www.engeo.com
Project No.
27375.000.001
June 3, 2025
Revised December 2, 2025
Ms. Marie Mai
Callander Associates Landscape Architecture, Inc.
2025 Gateway Place, Suite 285
San Jose, CA 95110
Subject: Sinnott Park Playground
Milpitas, California
GEOTECHNICAL EXPLORATION
Dear Ms. Mai:
ENGEO prepared this geotechnical exploration report for Callander Associates Landscape Architecture, Inc., as outlined in our agreement dated March 11, 2025. We characterized the subsurface conditions at the site to provide the enclosed geotechnical recommendations for design.
Our experience and that of our profession clearly indicate that the risk of costly design, construction, and maintenance problems can be significantly lowered by retaining the design geotechnical engineering firm to review the project plans and specifications and provide geotechnical testing and observation services during construction. Please let us know when working drawings are nearing completion, and we will be glad to discuss these additional services with you.
If you have any questions or comments regarding this report, please call and we will be glad to discuss them with you.
Sincerely,
ENGEO Incorporated
Angelo Campiglia Robert H. Beoche, CEG
ac/jr/rhb/jf
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
i of i June 3, 2025
Revised December 2, 2025
TABLE OF CONTENTS
LETTER OF TRANSMITTAL
1.0 INTRODUCTION .................................................................................................. 1
1.1 PURPOSE AND SCOPE .................................................................................................... 1
1.2 PROJECT LOCATION ........................................................................................................ 1
1.3 PROJECT DESCRIPTION .................................................................................................. 1
2.0 FINDINGS ............................................................................................................ 2
2.1 FIELD EXPLORATION ....................................................................................................... 2
2.1.1 Hand-Auger Borings .............................................................................................. 2
2.2 GEOLOGY .......................................................................................................................... 3
2.3 SURFACE CONDITIONS ................................................................................................... 3
2.4 SUBSURFACE CONDITIONS ............................................................................................ 4
2.5 GROUNDWATER CONDITIONS ....................................................................................... 4
2.6 LABORATORY TESTING ................................................................................................... 5
3.0 CONCLUSIONS ................................................................................................... 5
3.1 EXISTING FILL ................................................................................................................... 5
3.2 EXPANSIVE SOIL............................................................................................................... 5
3.3 SEISMIC HAZARDS ........................................................................................................... 5
3.4 2022 CBC SEISMIC DESIGN PARAMETERS ................................................................... 6
4.0 EARTHWORK RECOMMENDATIONS ............................................................... 6
4.1 EXISTING FILL REMOVAL ................................................................................................ 7
4.2 GENERAL SITE CLEARING .............................................................................................. 7
4.3 OVER-OPTIMUM SOIL MOISTURE CONDITIONS ........................................................... 7
4.4 ACCEPTABLE FILL ............................................................................................................ 7
4.5 FILL COMPACTION............................................................................................................ 8
4.5.1 Grading in Structural Areas .................................................................................... 8
4.5.2 Underground Utility Backfill .................................................................................... 8
4.5.2.1 General ................................................................................................... 8
4.5.2.2 Structural Areas ...................................................................................... 8
4.5.3 Landscape Fill ........................................................................................................ 8
4.6 STORMWATER BIORETENTION AREAS ......................................................................... 9
5.0 FOUNDATION RECOMMENDATIONS ............................................................. 10
6.0 PAVEMENT RECOMMENDATIONS ................................................................. 10
6.1 RIGID PAVEMENT ........................................................................................................... 10
6.2 DECOMPOSED GRANITE WALKWAYS ......................................................................... 11
7.0 LIMITATIONS AND UNIFORMITY OF CONDITIONS ....................................... 11
SELECTED REFERENCES
APPENDIX A – Laboratory Test Data
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 1 June 3, 2025
Revised December 2, 2025
1.0 INTRODUCTION
1.1 PURPOSE AND SCOPE
ENGEO prepared this geotechnical exploration report for design of the Sinnott Park Playground project in Milpitas, California. As outlined in our agreement dated March 11, 2025, you authorized ENGEO to conduct the following scope of services.
• Subsurface field exploration consisting of hand-auger borings • Soil laboratory testing
• Data analysis and conclusions
• Report preparation
For our use, we received the Preferred Site Plan, dated May 5, 2025, with proposed site features prepared by Callander Associates Landscape Architecture, delivered electronically via email.
This report was prepared for the exclusive use of our client and their consultants for the design of this project. In the event that any changes are made in the character, design , or layout of the development, we must be contacted to review the conclusions and recommendations contained in this report to evaluate whether modifications are recommended. This document may not be reproduced in whole or in part by any means whatsoever, nor may it be quoted or excerpted without our express written consent.
1.2 PROJECT LOCATION
The project site is located on Tahoe Drive in Milpitas, California, as shown in Exhibit 2.1.1-1. The project site is bounded to the north by John Sinnott Elementary School , to the east by Tahoe Drive, to the south by residential buildings, and to the west by Clear Lake Avenue.
1.3 PROJECT DESCRIPTION
Based on the Preferred Site Plan and Conceptual Plan (Exhibit 1.3-1), we understand that the following site improvements are proposed.
1. ADA access pathway improvements
2. Improvements to the existing playground structures, including foundations
3. Improvements to flatwork and landscaping, including pavement
4. Bioretention area improvements
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 2 June 3, 2025
Revised December 2, 2025
EXHIBIT 1.3-1: Conceptual Plan
2.0 FINDINGS
2.1 FIELD EXPLORATION
Our field exploration included three hand-auger borings at various locations on the site, as shown in the Site Plan, Exhibit 2.1.1-1, below. We performed our field exploration on May 15, 2025.
The location and elevations of our explorations are approximate and were estimated by using mobile Global Positioning System (GPS) and Geographic Information System (GIS) applications on handheld devices; they should be considered accurate only to the degree implied by the method used.
2.1.1 Hand-Auger Borings
Our field exploration included advancing three hand -auger borings drilled to a depth of approximately 5 feet below ground surface (bgs) at the approximate locations shown in Exhibit
2.1.1-1. An ENGEO representative advanced the hand-auger borings and logged the subsurface conditions. We retrieved drilled cutting samples from the hand auger borings in order to log the subsurface conditions.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 3 June 3, 2025
Revised December 2, 2025
EXHIBIT 2.1.1-1: Site Plan
2.2 GEOLOGY
Regional geology maps locate the site in the broad, north -south trending, alluvial -filled Santa Clara Valley. Review of published regional geologic mapping by Dibblee (2005) indicates the site is underlain by Holocene alluvial sediments consisting of gravel, sand, and clay (Qa). This area is known as a seismically active region of California and the site is approximately 0.7 miles west of the southwestern branch of the Hayward fault trace (Dibblee, 2005). The Hayward Fault is known for its potential to produce significant earthquakes.
2.3 SURFACE CONDITIONS
Based on the topographic survey prepared by Sandis and dated April 25, 2024 (Revision 2), the site ranges in elevation from approximately Elevation 113 feet to 118 feet (Datum = NAVD88) and gently slopes downward toward the adjacent streets.
We observed the following site features during our reconnaissance on May 15, 2025.
• Several mature trees throughout the site.
• An existing play structure with a sand area and a volleyball court. • Grass landscaping is present within the western and northern portions of the site. • A restroom structure is located in the northern portion of the site. • Several park benches are located in the western portion of the site. These features are supported on metal posts embedded into concrete.
• Walking paths are present throughout the site and typically consist of aggregate base rock.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 4 June 3, 2025
Revised December 2, 2025
2.4 SUBSURFACE CONDITIONS
We generally encountered silt with sand in the upper 1 foot underlain by lean clay with varying amounts of sand and trace gravel to the maximum depth explored of 5 feet. In Borings HA-1 and HA-2, a 2-inch-thick layer of poorly graded sand was encountered around 6 inches bgs. The sand and silt layers encountered in the upper 1 foot appear to be existing fill and likely placed during construction of the existing park . Laboratory tests for plasticity index (PI) of the clay material yielded PI values ranging from 21 to 25, indicating moderate expansion potential. We provide a summary of the subsurface conditions we encountered in the hand-auger borings in the following tables (2.4-1, 2.4-2, 2.4-3).
TABLE 2.4-1: Summary of Subsurface Conditions in Boring HA-1
BORING DEPTH
(feet bgs) SOIL DESCRIPTION
HA-1
0-1 SILT WITH SAND (ML) dark brown, moist, roots, trace gravels [FILL] At ½ foot bgs, encountered 2-inch-wide clean sand lense 1-3 LEAN CLAY (CL) dark brown, moist, medium plasticity, trace fine gravel and sand [NATIVE]
3-4.5 LEAN CLAY WITH SAND (CL) dark yellowish brown, moist, medium plasticity, fine-grained sand, trace fine gravels
TABLE 2.4-2: Summary of Subsurface Conditions in Boring HA-2
BORING DEPTH
(feet bgs) SOIL DESCRIPTION
HA-2
0-1 SILT WITH SAND (ML) dark brown, moist, roots, trace gravels [FILL] At ½ foot bgs, encountered 2-inch-wide clean sand lense 1-3 LEAN CLAY (CL) dark brown, moist, medium plasticity, trace fine gravel and sand, roots [NATIVE]
3-5 LEAN CLAY WITH SAND (CL) dark yellowish brown, moist, medium plasticity, fine-grained sand, trace fine gravels
TABLE 2.4-3: Summary of Subsurface Conditions in Boring HA-3
BORING DEPTH
(feet bgs) SOIL DESCRIPTION
HA-3
0-1 SILT WITH GRAVEL (ML) dark reddish brown, moist, fine gravels, roots, debris, sticks [FILL]
1-3 LEAN CLAY (CL) dark brown, moist, medium plasticity, fine-grained sand, trace gravels [NATIVE]
3-4 LEAN CLAY WITH SAND (CL) dark yellowish brown, moist, medium plasticity, fine-grained sand, trace fine gravels
2.5 GROUNDWATER CONDITIONS
We did not encounter groundwater in our hand -auger borings. The California Department of Conservation, Division of Mines and Geology (CGS, Calaveras Reservoir Quadrangle, 2001) reported that historic high groundwater levels may be as deep as approximately 30 to 40 feet at nearby sites.
Fluctuations in the level of groundwater may occur due to variations in rainfall, irrigation practice, and other factors not evident at the time measurements were made.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 5 June 3, 2025
Revised December 2, 2025
2.6 LABORATORY TESTING
We performed laboratory tests on selected soil samples to evaluate their engineering properties.
For this project, we performed plasticity index and wash sieve testing. Individual laboratory data is included in Appendix A.
3.0 CONCLUSIONS
From a geotechnical engineering viewpoint, in our opinion, the site is suitable for the proposed development, provided the geotechnical recommendations in this report are properly incorporated into the design plans and specifications.
The primary geotechnical concerns that could affect development on the site are existing fill and expansive soil. We summarize our conclusions below.
3.1 EXISTING FILL
We encountered approximately 1 foot of fill across the site. We do not have documentation of this fill being placed under engineering supervision, we consider it to be non-engineered fill.
Based on our review of historic aerial photos, it appears as though the site is not associated with a history of extensive development. However, we anticipate undocumented surficial fill may be present on the site as a result of previous agricultural activities. Existing fill should also be anticipated at the site within utility trenches, and at existing subsurface facilities and landscape areas.
Non-engineered fills could undergo vertical movement that is not easily characterized and could ultimately be inadequate to effectively support the proposed fills and planned improvement loads.
Without proper documentation of existing fill placed on the site, we recommend complete removal and recompaction of the existing fills in structural areas that are not removed by planned cuts as part of project grading.
3.2 EXPANSIVE SOIL
The near-surface soil encountered on site was lean clay with varying fines content. We observed potentially expansive lean clay at depths of 1 foot or greater bgs. Our laboratory testing indicates that the clayey soil exhibits moderate shrink/swell potential with variations in moisture content.
Based on our subsurface exploration, laboratory test results, and preliminary project data presented in Section 1.3, we opine that expansive soil present on site should not affect the proposed development. We should be retained to review final grading and site improvement plans, and to observe and test earthwork construction at the site.
3.3 SEISMIC HAZARDS
Based on the California Geologic Survey database this site does not lie within an Alquist-Priolo fault zone, landslide hazard zone, or liquefaction hazard zone (CGS, 2025). Therefore, the risk of these geologic hazards at the site is low.
Based on topographic and lithologic data, the risk of regional subsidence or uplift, soil liquefaction, lateral spreading, landslides, tsunamis, flooding, or seiches is considered low to negligible at the site.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 6 June 3, 2025
Revised December 2, 2025
3.4 2022 CBC SEISMIC DESIGN PARAMETERS
The 2022 California Building Code (C BC) utilizes seismic -design criteria established in the ASCE/SEI Standard “Minimum Design Loads and Associated Criteria for Buildings and Other Structures,” (ASCE 7 -16). Based on the subsurface conditions encountered and shear -wave velocity measurements reported for nearby locations ( as viewed on VSPDB), we characterized the site as Site Class D (Default).
In Table 3.4-1 below, we provide the CBC seismic parameters based on the United States Geological Survey’s (USGS’) Seismic Design Maps for your use. When using this table, considerations should be given to exceptions in Section 11.4.8 of ASCE 7-16.
TABLE 3.4-1: 2022 CBC Seismic Design Parameters, Latitude: 37.42036 Longitude: -121.87298
PARAMETER VALUE
Site Class D-Default
Mapped MCER Spectral Response Acceleration at Short Periods, S S (g) 2.43 Mapped MCER Spectral Response Acceleration at 1-second Period, S1 (g) 0.96 Site Coefficient, Fa 1.2
Site Coefficient, Fv 2.0*
MCER Spectral Response Acceleration at Short Periods, S MS (g) 2.55 MCER Spectral Response Acceleration at 1-second Period, SM1 (g) 1.97* Design Spectral Response Acceleration at Short Periods, S DS (g) 1.7 Design Spectral Response Acceleration at 1-second Period, SD1 (g) 1.31 * Mapped MCE Geometric Mean (MCEG) Peak Ground Acceleration, PGA (g) 0.914 Site Coefficient, FPGA 1.2
MCEG Peak Ground Acceleration adjusted for Site Class effects, PGA M (g) 0.87 Long period transition-period, TL (sec) 12
*The parameters above should only be used for calculation of Ts, determination of Seismic Design Category, and, when taking the exceptions under Items 1 and 2 of ASCE 7 -16 Section 11.4.8. (Supplement Number 3 https://ascelibrary.org/doi/epdf/10.1061/9780784414248.sup3).
4.0 EARTHWORK RECOMMENDATIONS
As used in this report, relative compaction refers to the in-place dry unit weight of soil expressed as a percentage of the maximum dry unit weight of the same soil, as determined by the ASTM D1557 laboratory compaction test procedure, latest edition. Compacted soil is not acceptable if it is unstable; it should exhibit only minimal flexing or pumping, as observed by an ENGEO representative.
The term “moisture condition” refers to adjusting the moisture content of the soil by either drying if too wet or adding water if too dry.
We define “structural areas” as any area sensitive to settlement of compacted soil. These areas include, but are not limited to, building pads, solar panels, sidewalks, pavement areas, and walls.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 7 June 3, 2025
Revised December 2, 2025
4.1 EXISTING FILL REMOVAL
We encountered fill in three of our exploratory borings up to a depth of approximately 1 foot bgs.
We expect that this was placed during the construction of landscaping areas and is unlikely to be detrimental to the proposed improvements. Should undocumented fill be uncovered during site grading, we recommend complete removal of undocumented fill in structural areas to competent native soil, as determined in the field by ENGEO. The undocumented fill should be subexcavated and reworked as engineered fill, as recommended in Section 4.5, provided the materials meet the requirements for acceptable fill in Section 4.4.
4.2 GENERAL SITE CLEARING
Areas to be developed should be cleared of surface and subsurface deleterious materials , including buried utility and irrigation lines, pavements, debris, and designated trees, shrubs, and associated roots. Clean and backfill excavations extending below the planned finished site grades with suitable material compacted to the recommendations presented in Section 4.6. ENGEO should be retained to observe and test backfilling.
Following clearing, the site should be stripped to remove surface organic materials. Strip organics from the ground surface to a depth of at least 2 to 3 inches below the surface. Remove strippings from the site or , if considered suitable by the landscape architect and owner, use them in landscape fill.
4.3 OVER-OPTIMUM SOIL MOISTURE CONDITIONS
The contractor should anticipate encountering excessively over -optimum (wet) soil moisture conditions during winter or spring grading, or during or following periods of rain. In addition, wet soil conditions may be found in excavations. Wet soil can make proper compaction difficult or impossible. Wet soil conditions can be mitigated by:
1. Frequent spreading and mixing during warm dry weather,
2. Mixing with drier materials,
3. Mixing with a lime or cement product, or
4. Stabilizing with aggregate or geotextile stabilization fabric, or both.
Options 3 and 4 should be evaluated by ENGEO prior to implementation.
4.4 ACCEPTABLE FILL
On-site soil and excess soil spoils generated from the site, except the upper fine sand layer, during demolition and site clearing are suitable for use as engineered fill provided they are processed to remove debris, particles greater than 3 inches in maxi mum dimension, and concentrations of organic material exceeding 3 percent by weight.
If reuse of select materials such as asphalt and concrete on site as engineered fill is desired, site-specific breakdown, blending, and placement recommendations can be developed. If desired to reuse asphalt or Portland cement concrete as engineered fill, the recycled asphalt or concrete should be ground down to less than 3 inches in greatest dimension but not pulverized.
Imported fill materials should meet the above requirements and have a PI less than 20. Allow ENGEO to sample and test proposed imported fill materials at least 5 days prior to delivery to the site.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 8 June 3, 2025
Revised December 2, 2025
4.5 FILL COMPACTION
4.5.1 Grading in Structural Areas
Perform subgrade compaction prior to fill placement, following cutting operations, and in areas left at grade as follows.
1. Scarify to a depth of at least 8 inches.
2. Moisture condition soil to at least 3 percentage points above the optimum moisture content for expansive soil and 1 percentage point above optimum moisture content for non-expansive soil.
3. Compact the subgrade to at least 90 percent relative compaction. Compact the upper 6 inches of finish pavement subgrade to at least 95 percent relative compaction prior to aggregate base placement.
After the subgrade soil has been compacted, place and compact acceptable fill as follows.
1. Spread fill in loose lifts that do not exceed 8 inches.
2. Moisture condition soil to at least 3 percentage points above the optimum moisture content for expansive soil and 1 percentage point above optimum moisture content for non-expansive soil.
3. Compact fill to a minimum of 90 percent relative compaction. Compact the upper 6 inches of fill in pavement areas to 95 percent relative compaction prior to aggregate base placement.
Compact the pavement Caltrans Class 2 Aggregate Base section to at least 95 percent relative compaction (ASTM D1557). Moisture condition aggregate base to or slightly above the optimum moisture content prior to compaction.
4.5.2 Underground Utility Backfill
4.5.2.1 General
The contractor is responsible for conducting trenching and shoring in accordance with Cal/OSHA requirements. Project consultants involved in utility design should specify pipe bedding materials.
4.5.2.2 Structural Areas
Place and compact trench backfill as follows.
1. Trench backfill should have a maximum particle size of 6 inches.
2. Moisture condition soil to at least 3 percentage points above the optimum moisture content for expansive soil and 1 percentage point above optimum moisture content for non-expansive soil.
3. Place fill in loose lifts not exceeding 12 inches.
4. Compact fill to a minimum of 90 percent relative compaction (ASTM D1557).
Jetting of backfill is not an acceptable means of compaction.
4.5.3 Landscape Fill
Process, place, and compact fill in accordance with Section 4.5.1, except compact to at least 85 percent relative compaction (ASTM D1557).
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 9 June 3, 2025
Revised December 2, 2025
4.6 STORMWATER BIORETENTION AREAS
Due to the density of the site soil and fines content (percentage passing the No. 200 sieve) generally exceeding 30 percent, the near -surface site soil is expected to have a low - to moderate-permeability value for stormwater infiltration unless subdrains are installed. Therefore, best management practices should assume that limited stormwater infiltration will occur at the site.
If bioretention areas are implemented, we recommend that, when practical, they be planned a minimum of 5 feet away from structural site improvements, such as sidewalks. When this is not practical, bioretention areas located within 5 feet of structural site improvements can either:
1. Be constructed with structural side walls capable of withstanding the loads from the adjacent improvements, or
2. Incorporate filter material compacted to between 85 and 90 percent relative compaction (ASTM D1557, latest edition) and a waterproofing system designed to reduce the potential for moisture transmission into the subgrade soil beneath the adjacent improvement.
In addition, one of the following options should be followed.
1. We recommend that bioretention design incorporate a waterproofing system lining the bioswale excavation and a subdrain, or other storm drain system, to collect and convey water to an approved outlet. The waterproofing system should cover the bioretention a rea excavation in such a manner as to reduce the potential for moisture transmission beneath the adjacent improvements.
2. Alternatively, and with some risk of movement of adjacent improvements, if infiltration is desired, we recommend the perimeter of the bioretention areas be lined with an HDPE tree root barrier that extends at least 1 foot below the bottom of the bioretenti on areas/infiltration trenches.
Site improvements located adjacent to bioretention areas that are underlain by base rock, sand, or other imported granular materials, should be designed with a deepened edge that extends to the bottom of the imported material underlying the improvement.
Where adjacent site improvements include buildings greater than three stories, streets steeper than 3 percent, or design elements subject to lateral loads (such as from impact or traffic patterns), additional design considerations may be recommended. If the surface of the bioretention area is depressed, the slope gradient should follow the slope guidelines described in earlier section(s) of this report. In addition, although not recommended, if trees are to be planted within bioretention areas, HDPE Tree Bo xes that extend below the bottom of the bioretention system should be installed to reduce potential impact to subdrain systems that may be part of the bioretention area design. For this condition, the waterproofing system should be connected to the HPDE Tree Box with a waterproof seal.
Given the nature of bioretention systems and possible proximity to improvements, we recommend ENGEO be retained to review design plans and provide testing and observation services during the installation of linings, compaction of the filter material, and connection of designed drains.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 10 June 3, 2025
Revised December 2, 2025
It should be noted that the contractor is responsible for conducting all excavation and shoring in a manner that does not cause damage to adjacent improvements during construction and future maintenance of the bioretention areas. As with any excavation adj acent to improvements, the contractor should reduce the exposure time such that the improvements are not detrimentally impacted.
5.0 FOUNDATION RECOMMENDATIONS
We understand that lightweight structures such as playground equipment, bench seating, or other smaller ancillary features may be planned within the site. These lightweight structures may be supported on spread footings assuming a firm base is present.
• Maximum Allowable Bearing Pressure: 2,000 pounds per square foot (psf) for dead-plus-live loads. This value can be increased by 30 percent to
include seismic or wind loads.
• Minimum Depth of Footing: 12 inches below lowest pad soil subgrade • Minimum Footing Width: 12 inches
As an alternative, lightweight structures may be supported on drilled piers. Soil design criteria for drilled piers and non-constrained pole footings are provided below.
• Maximum Allowable Skin Friction: 500 psf, ignoring the upper 12 inches of pad soil subgrade in the load computation
• Minimum Pier Diameter: 12 inches or 5 percent of pier length, whichever is greater
• Minimum Pier Depth: 4 feet below pad soil subgrade
For non-constrained pole footings, a minimum CBC allowable bearing pressure of 1,500 psf can also be considered for shallow site soil. Lateral loads may be resisted by passive pressures acting on footing/pier foundations and shear keyways. An equivalent fluid weight of 300 pounds per cubic foot (pcf) may be used to evaluate passive resistance , provided that the upper 1 foot of footing/pier embedment below pad soil subgrade is ignored and the area in front of the footing/pier is level for a distance of at least 5 feet at the elevation passive resistance is initiated. A friction factor of 0.30 may be utilized for sliding resistance between the base of the footing and foundation soil. If both passive pressure and sliding friction are to be used for footing design, one of the values should be reduced by 50 percent. For piers, passive resistance may be applied over two pier diameters. The project structural engineer should design and detail reinforcing steel based on the anticipated structural loads.
6.0 PAVEMENT RECOMMENDATIONS
6.1 RIGID PAVEMENT
If the existing concrete walkway around the playground is planned to be replaced as part of playground improvements, for hardscape exposed to foot traffic only, a 4-inch-thick concrete section over a minimum of 4 inches of aggregate base on prepared subgra de, in conformance with the compaction specifications in Section 4.5, may be utilized. Thicken flatwork edges to at least 8 inches to help control moisture variations in the subgrade and place wire mesh or rebar within the middle third of the slab to help control the width and offset of cracks. Construct control and construction
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 11 June 3, 2025
Revised December 2, 2025
joints in accordance with current Portland Cement Association Guidelines. Including wire mesh or steel rebar reinforcement will improve the performance of the concrete hardscape and decrease ongoing maintenance requirements.
6.2 DECOMPOSED GRANITE WALKWAYS
Non-paved walkways consisting of decomposed granite (DG) subject only to pedestrian -type traffic should comply with the following minimum requirements.
• The decomposed granite surface should be a minimum of 4 inches thick and a polymer binder should be applied.
• The surface layer should be underlain by at least 6 inches of compacted aggregate base over processed subgrade soil.
It should be noted that DG surfaces typically require some maintenance, such as filling in ruts or replacing DG eroded by wind or rain. Refer to Section 4.5 for relative compaction and moisture content specifications for subgrade and aggregate base.
7.0 LIMITATIONS AND UNIFORMITY OF CONDITIONS
This report presents geotechnical recommendations for design of the improvements discussed in Section 1.3 for the Sinnott Park Playground project. If changes occur in the nature or design of the project, we should be allowed to review this report and provide additional recommendations, if any. It is the responsibility of the owner to transmit the information and recommendations of this report to the appropriate organizations or people involved in design of the project, including but not limited to owners, architects, engineers, and designers. Th e conclusions and recommendations contained in this report are solely professional opinions and are valid fo r a period of no more than 2 years from the date of report issuance.
We strive to perform our professional services in accordance with generally accepted principles and practices currently employed in the area; there is no warranty, express or implied. There are risks of earth movement and property damages inherent in building on or with earth materials.
We are unable to eliminate all risks; therefore, we are unable to guarantee or warrant the results of our services.
This report is based upon field and other conditions discovered at the time of report preparation.
We developed this report with limited subsurface exploration data. We assumed that ou r subsurface exploration data are representative of the actual subsurface conditions across the site. Considering possible underground variability of soil and groundwater, additional costs may be required to complete the project. We recommend that the owner establish a contingency fund to cover such costs. If unexpected condit ions are encountered, ENGEO must be notified immediately to review these conditions and provide additional and/or modified recommendations, as necessary.
Our services did not include excavation sloping or shoring, soil volume change factors, flood potential, or a geohazard exploration. In addition, our geotechnical exploration did not include work to determine the existence of possible hazardous materials. If any hazardous materials are encountered during construction, the proper regulatory officials must be notified immediately.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
Page | 12 June 3, 2025
Revised December 2, 2025
This document must not be subject to unauthorized reuse , that is, reusing without written authorization of ENGEO. Such authorization is essential because it requires ENGEO to evaluate the document’s applicability given new circumstances, not the least of which is passage of time.
Actual field or other conditions will necessitate clarifications, adjustments, modifications, or other changes to ENGEO’s documents. Therefore, ENGEO must be engaged to prepare the necessary clarifications, adjustments, modifications, or other changes before construction activities commence or further activity proceeds. If ENGEO’s scope of services does not include on -site construction observation, or if other persons or entities are retained to provide such services, ENGEO cannot be held responsible for an y or all claims arising from or resulting from the performance of such services by other persons or entities, and from any or all claims arising from or resulting from clarifications, adjustments, modifications, discrepancies , or other changes necessary to reflect changed field or other conditions.
We determined the lines designating the interface between layers on the exploration logs using visual observations. The transition between the materials may be abrupt or gradual. The exploration logs contain information concerning samples recovered, indications of the presence of various materials such as clay, sand, silt, rock, existing fill, etc., and observations of groundwater encountered. The field logs also contain our interpretation of the subsurface conditions between sample locations. Therefore, the logs contain both factual and interpretative information. Our recommendations are based on the contents of the final logs , which represent our interpretation of the field logs.
Callander Associates Landscape Architecture, Inc. Sinnott Park Playground 27375.000.001 Geotechnical Exploration
June 3, 2025
Revised December 2, 2025
SELECTED REFERENCES
California Department of Conservation, Division of Mines and Geology. 2001. Seismic Hazard Zone Report 048: Seismic Hazard Zone Report for the Calaveras Reservoir 7.5 -Minute Quadrangle, Santa Clara County, California. Sacramento, CA: California Department of Conservation.
California Geological Survey (CGS). 2015. Landslide Inventory and Deep -Seated Landslide Susceptibility Map. https://maps.conservation.ca.gov/cgs/lsi/
California Geological Survey (CGS). 2025. Earthquake Zones of Required Investigation. https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/
California Geological Survey (CGS). 2025. Alquist-Priolo Site Investigation Reports.://maps.conservation.ca.gov/cgs/informationwarehouse/apreports/
California Geological Survey. 2018. Earthquake Fault Zones – A Guide for Government Agencies, Property Owners / Developers, and Geoscience Practitioners for Assessing Fault Rupture Hazards in California: Special Publication 42 (SP42),
https://www.conservation.ca.gov/cgs/Documents/Publications/Special- Publications/SP_042.pdf
Dibblee, T.W. and Minch, J.A. . 2005. Geologic map of the Calaveras Reservoir quadrangle, Alameda & Santa Clara Counties, California , California, Dibblee Geological Foundation, Dibblee Foundation Map DF-154, 1:24,000.
Google Earth. 2025.
Historic Aerials. 2025 Historic Aerials Viewer. http://www.historicaerials.com
Seismic Maps. 2025, Seismic Maps. https://www.seismicmaps.org/
APPENDIX A
LABORATORY TEST DATA
===
===
===
FINE COARSE
DEPTH (ft):
COARSE MEDIUM FINE
73 ATTERBERG LIMITS
PL =
SAMPLE ID:
2-3
HA-1@2'-3'
113 2 2
% FINES
SILT CLAY
% +75mm
% GRAVEL % SAND
D15
ASTM D6913, Method A
PARTICLE SIZE DISTRIBUTION REPORT
SIEVE
SIZE
PERCENT
FINER
SPEC.*
PERCENT
PASS?
(X=NO)
SOIL DESCRIPTION
See exploration logs
⅜ in.
#4
#10
#20
#40
#60
#100
#140
#200
100
99 98
96 95
93 85
78 73
* (no specification provided)
LL = PI =
COEFFICIENTS
D
90 0.2064 mm D85 0.1500 mm D 60
D50 D30
REMARKS
CLASSIFICATION
USCS =
D10 Cu Cc
2633 Camino Ramon, Suite 150 | San Ramon, CA 94583 | T: (925) 355-9047 | F: (888) 279-2698 | www.engeo.com REPORT DATE: 5/27/2025
TESTED BY: Y. Cabrales
REVIEWED BY: G. Criste
CLIENT: Callander Associates Landscape Architecture, Inc.
PROJECT NAME: Sinnott Park Playground
PROJECT NO: 27375.000.001 PH001
PROJECT LOCATION: Milpitas, CA
0 10
20 30
40 50
60 70
80 90
100
0.0010.010.1110100
PERCENT FINER
GRAIN SIZE - mm.
6 in.
3 in.
2 in.
1 ½ in.
1 in.
¾ in.
½ in.
⅜ in.
#4
#10
#20
#40
#60
#100
#140
#200
===
===
===
FINE COARSE
DEPTH (ft):
COARSE MEDIUM FINE
68 ATTERBERG LIMITS
PL =
SAMPLE ID:
3-4
HA-3@3'-4'
212 2 7
% FINES
SILT CLAY
% +75mm
% GRAVEL % SAND
D15
ASTM D6913, Method A
PARTICLE SIZE DISTRIBUTION REPORT
SIEVE
SIZE
PERCENT
FINER
SPEC.*
PERCENT
PASS?
(X=NO)
SOIL DESCRIPTION
See exploration logs
¾ in.
½ in.
⅜ in.
#4
#10
#20
#40
#60
#100
#140
#200
100
100
100
98 97
96 95
92 83
75 68
* (no specification provided)
LL = PI =
COEFFICIENTS
D
90 0.2232 mm D85 0.1680 mm D 60
D50 D30
REMARKS
CLASSIFICATION
USCS =
D10 Cu Cc
2633 Camino Ramon, Suite 150 | San Ramon, CA 94583 | T: (925) 355-9047 | F: (888) 279-2698 | www.engeo.com REPORT DATE: 5/28/2025
TESTED BY: Y. Cabrales
REVIEWED BY: G. Criste
CLIENT: Callander Associates Landscape Architecture, Inc.
PROJECT NAME: Sinnott Park Playground
PROJECT NO: 27375.000.001 PH001
PROJECT LOCATION: Milpitas, CA
0 10
20 30
40 50
60 70
80 90
100
0.0010.010.1110100
PERCENT FINER
GRAIN SIZE - mm.
6 in.
3 in.
2 in.
1 ½ in.
1 in.
¾ in.
½ in.
⅜ in.
#4
#10
#20
#40
#60
#100
#140
#200
27375.000.001 PH001
Milpitas, CA
5/28/2025
PI: ASTM D4318, Wet Method
PI: ASTM D4318, Wet Method
Callander Associates Landscape Architecture, Inc.
PIDEPTH (ft)
25 21
SAMPLE ID MATERIAL DESCRIPTION LL PL
HA-2@3-4 See exploration logs 40 193-4
HA-1@3-4 See exploration logs 41 163-4
2633 Camino Ramon, Suite 150 | San Ramon, CA 94583 | T: (925) 355-9047 | F: (925) 355-9052 | www.engeo.com PROJECT LOCATION:
PROJECT NO:
PROJECT NAME:
CLIENT:
REPORT DATE:
K. Nguyen
G. Criste
TESTED BY:
REVIEWED BY:
Sinnott Park Playground
HA-2@3-4
LIQUID AND PLASTIC LIMITS TEST REPORT
ASTM D4318
HA-1@3-4
SAMPLE ID TEST METHOD REMARKS
0 10
20 30
40 50
60 70
80 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
PLASTICITY INDEX
LIQUID LIMIT
MH or OH
CH or OH
CL-ML
ML or OL
CL or OL
Dashed Line indicates the approximate
upper limit boundary for natural soils
www.engeo.com
www.engeo.com
1450 Harbor Boulevard Suite F
CONSULTING West Sacramento, CA
Engineers Inc. p: 916.716.6910
www.rwengineers.com
Sinnott Park
Playground Equipment Anchorage
December 5, 2025
Structural Calculations
RW
Revised January 15, 2026
December 5, 2025
S-4555
SE
P
CFOE
RO
EG
R
IS
RE
ATS
TE
D
T
A
I
AI
ENGINEER
AN
L
ROFI
O
N
L
G AHR CI .
RDS
YR
ERG
F S
O I
STRUC
LARUT
Exp. 12/31/2026
1. Design Criteria
2. Cozy Cacoon Spinner
3. Mobius Climber
4. We-Go-Round Carousel
5. ZipKrooz Zipline
6. Welcome Sign
7. Belt Swing
8. Oodle Swing
9. Spring Rider
10. Tot Bucket Swings
11. Playground Structures
12. Sway Fun Glider
13. Appendix
January 15, 2026
7 31
13 15
17 19
21 23
These calculations were prepared by
Sinnott Park
RW Consulting Engineers
3 5
Playground Equipment Anchorage
1 9
11 # Pages
1
project
CONSULTING
Engineers Inc. by job no. page no.
date
Project Scope
General Criteria Applicable Building Code: 2022 CBC Risk Category: II Governing Jurisdiction: City of Milpitas
Project Location: Tahoe Dr, Milpitas, CA 95035
Latitude:
Longitude:
Soils Criteria Soils Report By: ENGEO Incorporated
Project Number: Dated:
Allowable Bearing Pressure = psf (For D + L Loads)
= psf (Including W or E Loads)
Passive Pressure = pcf With a 4 / 3 increase = pcf
Design Criteria
Sinnott Park
Playground Equipment Anchorage
CH 25-090RW
9/30/2025 1
+37.42036 Degrees North
-121.87298 Degrees West
The following calculations have been prepared by RW Engineers for a site upgrade project at Sinnott Park in Milpitas, CA 2,000
2,600
27375.000.001 June 3, 2025
300 400
project
CONSULTING
Engineers Inc. by job no. page no.
date
Wind Loads Risk Category = [ASCE 7-16 Chapter 26]
Exposure = K z (Velocity Pressure Exposure Coefficient) = 2.01 (Z / Z g ) 2 / a Wind Speed (ASD) = mph K zt (Topographic Factor) =
Wind Speed (USD) = mph K d (Wind Directionality Factor) = K e (Ground Elevation Factor) =
USD Wind Pressures
q (z) = 0.00256 x K Z x K Zt x K d x K e x V 2 q (0'-15') = 0.00256 x 0.85 x 1.00 x 0.85 x 1.00 x (92) 2 = psf
q (15'-20') = 0.00256 x 0.90 x 1.00 x 0.85 x 1.00 x (92) 2 = psf
Wind Load on Structures
Pressure F(W-USD) = q x G x C f x A f G = C f =
p(USD) = psf x x = psf
Seismic Design Criteria Risk Category = Seismic Design Category D [ASCE 7-16 Ch 11] I (Seismic) = Equivalent Lateral Force Procedure Site Class D S DS = From Geotech Report = g (0.2 s) [ASCE 7-16, Eq. 11.4-3] S D1 = From Geotech Report = g (1.0 s) [ASCE 7-16, Eq. 11.4-4] Amusement structures and monuments R = W 0 = C d =
/
E (USD) = ρ x V = x x W = x W [ASCE 7-16, Eq. 12.4-3]
E (ASD) = 0.7 x V(USD) = x x W = x W
Load Combinations - LRFD
2. 1.2D + 1.6L
4. 1.2D + 1.0W + 1.0L
6. (1.2+0.2S DS )D + W 0 Q E + L
II
C
Design Criteria
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 2
1.740
1.310
II
1.00 2.00 2.00 2.00
V = C S x W = S DS
x W = 1.740 x W = 0.870 x W [ASCE 7-16, Eq. 12.8-2]
71 1.00
92 0.85
1.00 1.0 0.870 0.870
0.7 0.870 0.609
R / I 2 1.00
15.7 16.6
0.85 1.20
16.6 0.85 1.20 17.0
project
CONSULTING
Engineers Inc. by job no. page no.
date
Cozy Cacoon Spinner
Component Weight, D = lb Structure Length, L = in
Occupant Weight, L = lb Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb-ft Mu = lb-ft Mu = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb-ft M = lb-ft M = lb-ft
H eff = ft H eff = ft H eff = ft
Cozy Cacoon Spinner
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 3
RW
0.870
10.7 182.1
Assume 2/3H For Height CG
182
132.0
114.8
115
132
200
17.0 34.9
34.9 44.2 29.5
320
1179
382
478 358 404
1072
430
1301
200
737
115
281.996
182
335
200
737
232
703
161
395
3.68 3.03 2.46
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 6-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (18'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
703 24.00
16.003
12 528
17.59 PSI force is low, posts embedment in concrete is sufficient 232
3.03 232 4.03
= 2.34P
332
1,325
1,657
18.8 RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 4
18 4.00 300
Cozy Cacoon Spinner
S 1 b (400 psf)(1.5 ft)
d = x 1 + 1 + 4.36 x h = 2.49 ftA 18'' diameter x 5' deep Drilled Pier S 1 = d x q =
18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
1.04% 0.50%
= 2.34(232 lb) = 0.903 400 psf A
18.8 500 9,425
Ignore Top 1.0ft of Soil
2.64 254
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 9 in - 8.18 in = in
f M n = 0.9(0.44)(60 ksi)(14 - 0.82) = in-k > in-k DCR = O.K.0.089 Cozy Cacoon Spinner
232
3.03 3.00 6.03
232 6.03 1,399
0.82 313 28.0
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 4.1
2,332 27,985
0.56 y d = 4R x sin 3 a = 8.18 in3 2a - sin(2a)
0.9 0.44
9.00 d = 18 in - 4 in = 14.00 in A c = A s F y
= 8.9 in0.85 f' c
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Mobius Climber
Component Weight, D = lb Structure Length, L = in
Occupant Weight, L = lb Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb-ft Mu = lb-ft Mu = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb-ft M = lb-ft M = lb-ft
H eff = ft H eff = ft H eff = ft
12.0 265.0
204.0 230.6
200 231 204
320 404 661
1280 1208 2030
800 614.8 408
638 518 610
32.0 231
17.0 0.870
Mobius Climber
265 36
200 36
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 5
204 48
Assume 2/3H For Height CG
Trib to one post
784 861
4.00 3.24 2.67
200 242 323
800
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 6-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (18'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
861 20.00
3 13.33
10 775
30.99 PSI force is low, posts embedment in concrete is sufficient Mobius Climber
323 3.67
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 6
323
2.67 = 1.26
18 4.00 300
S 1 = d x q = 400 psf A3 S 1 b (400 psf)(1.5 ft)= 2.34(323 lb) d = x 1 + 1 + 4.36 x h =
= 2.34P
2.64 254
1.04% 0.50%
2.96 ftA 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 500 9,425
465
1,325
1,790
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 9 in - 8.18 in = in
f M n = 0.9(0.44)(60 ksi)(14 - 0.82) = in-k > in-k DCR = O.K.
0.82 313 36.6 0.117
0.56 y d = 4R x sin 3 a = 8.18 in3 2a - sin(2a)
0.9 0.44
9.00 d = 18 in - 4 in = 14.00 in A c = A s F y
= 8.9 in0.85 f' c
2.67 3.00 5.67
323 5.67 1,829
3,048 36,581
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 6.1
Mobius Climber
323
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
We-Go-Round Carousel
Component Weight, D = lb Structure Length, L = in
Occupant Weight, L = lb Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb-ft M = lb-ft M = lb-ft
H eff = ft H eff = ft H eff = ft
56.8 2158.0
965.8 1877.5
600 1877 966
4050 8448.57 3260
54.0 1877
17.0 0.870
We-Go-Round Carousel
2158 101
600 101 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 7
966 81
4050 4504 11828
6.75 5.09 4.50
600 885 2628
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Spread Footing
Spread Footing Vertical load applied to footing R = k Footing: L = ft Weight of footing W = k B = ft
P = k D = ft
Resisting Moment (P x L / 2) M R = k-ft Overturning Moment M O = k-ft Soil Bearing Pressure -
L / 3 = ft
Check Spread Footing Stability (1.0+0.14S DS )D + 0.7 W 0 Q E Reduced Moment (0.9-0.14S DS ) x M R
= k-ft Overturning Moment M O = k-ft
Load on Spread Footing
P (D+L) = = lb
P (Footing) = L x B x D x 150 pcf = lb
lb
lb
psf
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
Check Reinforcement Ratio
As,min = = in 2
As = = in 2
We-Go-Round Carousel
2.8 4.00
9.6 4.00
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 8
12.4 4.00
24.7 11.8
a = 24.7 k-ft 11.8 k-ft = 1.0 ft Resultant is outside the middle 1 / 31.3 12.4 k
p MAX = 2 P = 2 (12.358 k) = 2,0603 a B 3 (1')(4') psf < 2,600 psf OK
11.8 OK
2,758
9,600
0.66 x M R 16.2 >
OK2,000
12,358
A REQ = 12,358 = 6.18 ft 2 <
0.0018 x A 3.63
15-#5 bars 4.65
OK
A FTG = 16.00 ft 2
11828 42.00
6 28.00
21 5069
40.23 PSI force is low, posts embedment in concrete is sufficient
project
CONSULTING
Engineers Inc. by job no. page no.
date
ZipKrooz Zipline
Component Weight, D = lb/post Structure Length, L = in
Occupant Weight, L = lb/post Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb/post
Wind Loading, W (Support Posts) Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb-ft Mu = lb-ft Mu = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb-ft M = lb-ft M = lb-ft
H eff = ft H eff = ft H eff = ft
3.6 123.1
62.0 107.1
200 107 62
320 262 414
2800 2021 2999
70.0 107
17.0 0.870
ZipKrooz Zipline
123 402 Trib to center posts
200 216 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 9
62 105
1750 625 271
468 348 391
1750 1435 875
8.75 8.06 5.83
200 178 150
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 6-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (18'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
1750 20.00
3 13.33
10 1575
52.50 PSI force is low, posts embedment in concrete is sufficient ZipKrooz Zipline
200
8.75 200 9.75
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 10
= 0.78
18 4.00 300
S 1 = d x q = 400 psf A3 S 1 b (400 psf)(1.5 ft)= 2.34(200 lb) d = x 1 + 1 + 4.36 x h =
= 2.34P
2.64 254
1.04% 0.50%
3.30 ftA 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 500 9,425
323
1,325
1,648
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 9 in - 8.18 in = in
f M n = 0.9(0.44)(60 ksi)(14 - 0.82) = in-k > in-k DCR = O.K.
0.82 313 47.0 0.150
0.56 y d = 4R x sin 3 a = 8.18 in3 2a - sin(2a)
0.9 0.44
9.00 d = 18 in - 4 in = 14.00 in A c = A s F y
= 8.9 in0.85 f' c
8.75 3.00 11.75
200 11.75 2,350
3,917 47,000
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 10.1
ZipKrooz Zipline
200
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Welcome Sign
Component Weight, D = lb Sign Height = in
Occupant Weight, L = lb Sign Width = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb Mu = lb Mu = lb
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb M = lb M = lb
H eff = ft H eff = ft H eff = ft
1.8 27.0
30.0 23.5
200 23 30
320 230 247
1333 936 1029
50.0 23
17.0 0.870
Welcome Sign
27 18
200 18 Assume H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 11
30 50
833 98 103
352 232 242
833 671 137
4.17 4.10 4.17
200 164 33
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 6-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (18'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
833 20.00
2.375 13.33
10 750
31.58 PSI force is low, posts embedment in concrete is sufficient Welcome Sign
200
4.17 200 5.17
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 12
= 0.78
18 4.00 300
S 1 = d x q = 400 psf A3 S 1 b (400 psf)(1.5 ft)= 2.34(200 lb) d = x 1 + 1 + 4.36 x h =
= 2.34P
2.64 254
1.04% 0.50%
2.52 ftA 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 500 9,425
227
1,325
1,552
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 9 in - 8.09 in = in
f M n = 0.9(0.44)(60 ksi)(14 - 0.91) = in-k > in-k DCR = O.K.
0.91 311 28.7 0.092
0.59 y d = 4R x sin 3 a = 8.09 in3 2a - sin(2a)
0.9 0.44
9.00 d = 18 in - 4 in = 14.00 in A c = A s F y
= 8.9 in0.85 f' c
4.17 3.00 7.17
200 7.17 1,433
2,389 28,667
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 12.1
Welcome Sign
200
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Belt Swing
Component Weight, D = lb/post Structure Length, L = in
Occupant Weight, L = lb/post Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb/post
Wind Loading, W (Support Posts) Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb M = lb M = lb
H eff = ft H eff = ft H eff = ft
1.7 122.0
29.5 106.1
200 106 30
33.3 106
17.0 0.870
Belt Swing
122 126
200 42 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 13
30 50
833 295 61
833 653 413
4.17 4.00 2.78
200 163 149
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 8-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (24'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
833 40.00
3.000 26.67
20 375
6.25 PSI force is low, posts embedment in concrete is sufficient Belt Swing
200
4.17 200 5.17
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 14
= 0.59
24 4.00 300
S 1 = d x q = 400 psf A3 S 1 b (400 psf)(2 ft)= 2.34(200 lb) d = x 1 + 1 + 4.36 x h =
= 2.34P
3.52 452
0.78% 0.50%
2.14 ftA 24'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
25.1 24'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
25.1 500 12,566
322
2,356
2,678
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 12 in - 11.25 in = in
f M n = 0.9(0.44)(60 ksi)(20 - 0.75) = in-k > in-k DCR = O.K.
0.75 457 28.7 0.063
0.46 y d = 4R x sin 3 a = 11.25 in3 2a - sin(2a)
0.9 0.44
12.00 d = 24 in - 4 in = 20.00 in A c = A s F y
= 8.9 in0.85 f' c
4.17 3.00 7.17
200 7.17 1,433
2,389 28,667
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 14.1
Belt Swing
200
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Oodle Swing
Component Weight, D = lb/post Structure Length, L = in
Occupant Weight, L = lb/post Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb/post
Wind Loading, W (Support Posts) Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb M = lb M = lb
H eff = ft H eff = ft H eff = ft
1.4 98.8
23.6 85.9
50 86 24
76.0 86
17.0 0.870
Oodle Swing
99 157
50 40 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 15
24 114
475 544 112
475 407 762
9.50 8.45 6.33
50 48 120
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 6-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (18'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
762 24.00
3.500 16.00
12 571
13.60 PSI force is low, posts embedment in concrete is sufficient Oodle Swing
120
6.33 120 7.33
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 16
= 0.47
18 4.00 300
S 1 = d x q = 400 psf A3 S 1 b (400 psf)(1.5 ft)= 2.34(120 lb) d = x 1 + 1 + 4.36 x h =
= 2.34P
2.64 254
1.04% 0.50%
2.19 ftA 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 500 9,425
149
1,325
1,474
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 9 in - 8.18 in = in
f M n = 0.9(0.44)(60 ksi)(14 - 0.82) = in-k > in-k DCR = O.K.
0.82 313 22.5 0.072
0.56 y d = 4R x sin 3 a = 8.18 in3 2a - sin(2a)
0.9 0.44
9.00 d = 18 in - 4 in = 14.00 in A c = A s F y
= 8.9 in0.85 f' c
6.33 3.00 9.33
120 9.33 1,123
1,871 22,452
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 16.1
Oodle Swing
120
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Spring Rider
Component Weight, D = lb Structure Length, L = in
Occupant Weight, L = lb Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb Mu = lb Mu = lb
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb M = lb M = lb
H eff = ft H eff = ft H eff = ft
3.0 83.0
51.0 72.2
200 72 51
320 251 344
960 677 889
24.0 72
17.0 0.870
Spring Rider
83 36
200 12 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 17
51 36
600 144 77
420 300 328
600 484 202
3.00 2.80 2.00
200 173 101
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 6-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (18'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
600 20.00
3.500 13.33
10 540
15.43 PSI force is low, posts embedment in concrete is sufficient Spring Rider
200
3.00 200 4.00
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 18
= 0.78
18 4.00 300
S 1 = d x q = 400 psf A3 S 1 b (400 psf)(1.5 ft)= 2.34(200 lb) d = x 1 + 1 + 4.36 x h =
= 2.34P
2.64 254
1.04% 0.50%
2.27 ftA 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 18'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
18.8 500 9,425
283
1,325
1,608
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 9 in - 8.18 in = in
f M n = 0.9(0.44)(60 ksi)(14 - 0.82) = in-k > in-k DCR = O.K.
0.82 313 24.0 0.077
0.56 y d = 4R x sin 3 a = 8.18 in3 2a - sin(2a)
0.9 0.44
9.00 d = 18 in - 4 in = 14.00 in A c = A s F y
= 8.9 in0.85 f' c
3.00 3.00 6.00
200 6.00 1,200
2,000 24,000
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 18.1
Spring Rider
200
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Tot Bucket Swings
Component Weight, D = lb Structure Length, L = in
Occupant Weight, L = lb Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W (Support Posts) Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb M = lb M = lb
H eff = ft H eff = ft H eff = ft
1.8 136.0
31.0 118.3
400 118 31
50.0 118
17.0 0.870
Tot Bucket Swings
136 116
400 42 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 19
31 75
2500 493 97
2500 1919 690
6.25 6.11 4.17
400 314 166
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 10-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (30'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi
2500 30.00
3.500 20.00
15 1500
28.57 PSI force is low, posts embedment in concrete is sufficient Tot Bucket Swings
400
6.25 RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 20
400 7.25
30 4.00 300
3,682
4,218
536
4.4 1 +
= == 2.34P 2.34(400 lb) = 0.943 S 1 b (400 psf)(2.5 ft) S 1 = d x q 400 psf A
3.24 ftA 30'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
d = x 1 + 4.36 x h =
31.4 30'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
31.4 500 15,708
707
0.62% 0.50%
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 15 in - 14.31 in = in
f M n = 0.9(0.44)(60 ksi)(25.5 - 0.69) = in-k > in-k DCR = O.K.
0.69 589 74.0 0.126
0.395
y d = 4R x sin 3 a = 14.31 in3 2a - sin(2a)
0.9 0.44
15.00 d = 30 in - 4.5 in = 25.50 in A c = A s F y
= 8.9 in0.85 f' c
6.25 3.00 9.25
400 9.25 3,700
6,167 74,000
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 20.1
Tot Bucket Swings
400
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Playground Structures (Ramp, Worst Case Loading)
Component Weight, D = lb/post Structure Length, L = in
Occupant Weight, L (40psf) = lb/post Structure Width, W = in Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W (Support Posts) Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb M = lb M = lb
H eff = ft H eff = ft H eff = ft
2870 2309 706
8.00 7.49 5.33
359 308 132
2870 504.6 349
5.1 108.8
87.1 94.6
358.75 95 87
87 96 64.0
95 17.0 0.870
Playground Structures
108.75 123
358.75 42 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 21
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Drilled Pier
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft
Design of Nonconstrained Drilled Pier [2022 CBC, 1807.3.2.1, Eq 18-1] Applied Load: P = lb @ h = ft
Diameter (b) = in x Depth (d) = ft Soil (q) = psf / ft
A
2 Ratio of Steel to Concrete Area of 8-#6 Bars A = in 2 Area of pier A = p d 2 / 4 = in 2 (24'' diameter)
Ratio of area of steel to area of concrete = > OK
Gravity Load on Pier
P (D+L) = = lb
P (Pier) = p r 2 x h x 150 pcf = lb
lb
Capacity of Pier Resistance to gravity loading is provided by friction along surface of piers.
Surface Area of Pier A = ft 2
Downward Capacity of Pier = ft 2 x psf = lb OK
Check Equipment Embedment Mu = lb-ft Embed = in
Post Diameter = in M-Arm = in
a = 1/2 Embed = in Force, F = lbs
F brg = psi86.10
PSI force is low, posts embedment in concrete is sufficient 2870 20.00
3.000 13.33
10 2583
25.1 24'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
25.1 500 12,566
468
2,356
2,824
3.52 452
0.78% 0.50%
3.78 ftA 24'' diameter x 5' deep Drilled Pier
Ignore Top 1.0ft of Soil
3 S 1 b (400 psf)(2 ft)= 2.34(359 lb) = 1.05
d = x 1 + 1 + 4.36 x h =
= 2.34P
24 4.00 300
S 1 = d x q = 400 psf A
Playground Structures
359
8.00 359 9.00
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 22
project
CONSULTING
Engineers Inc. by job no. page no.
date
Capacity of Pier Section
Lateral Load on Pier: Lateral Load P = lb <= Horizontal Load @ Top of Column Effective Height of Load h = ft + ft = ft
Moment at mid-hieght of pier (ASD) M A = lb x ft = lb-ft M U = lb-ft x 12 / 1000 = lb-in
f M n = f A s F y z f = A s = in 2 F y = 60 ksi
Radius (R) = in z = d - a /2 f' c = 3.5 ksi
A c = 1/2(R 2 )(2a - sin(2a))
a = radians (found by interation)
y 1 = R - y d = 12 in - 11.25 in = in
f M n = 0.9(0.44)(60 ksi)(20 - 0.75) = in-k > in-k DCR = O.K.
0.75 457 78.9 0.173
0.46 y d = 4R x sin 3 a = 11.25 in3 2a - sin(2a)
0.9 0.44
12.00 d = 24 in - 4 in = 20.00 in A c = A s F y
= 8.9 in0.85 f' c
8.00 3.00 11.00
359 11.00 3,946
6,577 78,925
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 22.1
Playground Structures
359
d
R
y1
As
project
CONSULTING
Engineers Inc. by job no. page no.
date
Sway Fun Glider
Component Weight, D = lb Structure Length, L = in
Occupant Weight, L = lb Structure Width, W = in
Wind Loading, W = lb Structure Height, H = in Height CG = in Seismic Loading, E = lb
Wind Loading, W Seismic Loading, E
p(USD) = psf E(USD) = x W
A f = ft 2 W = lb
W = lb E = lb
Component Demand Forces Assume structure is rigid for load transfer V LL = lb V E = lb V W = lb
M LL = lb-ft M E = lb-ft M W = lb-ft
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb-ft Mu = lb-ft Mu = lb-ft
H eff = ft H eff = ft H eff = ft
Loading For Foundation Design
2. 1.0D + 1.0L 6. 1.0D + 0.75L + (0.75)0.6W 8. (1.0+0.14S DS )D + 0.7 W 0 Q E V = lb V = lb V = lb
M = lb-ft M = lb-ft M = lb-ft
H eff = ft H eff = ft H eff = ft
1067 1092 2767
2.67 2.10 1.78
2.67 1.93 1.91
400 519 1557
640 887 2624
1707 1716 5020
1067 1976.64 650
2174 1934 2378
28.7 1278.0
487.3 1111.9
400 1112 487
487 32 21.3
1112
17.0 0.870
Sway Fun Glider
1278 129
400 83 Assume 2/3H For Height CG
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 23
project
CONSULTING
Engineers Inc. by job no. page no.
date
Foundation Design - Spread Footing
Spread Footing Vertical load applied to footing R = k Footing: L = ft Weight of footing W = k B = ft
P = k D = ft
Resisting Moment (P x L / 2) M R = k-ft Overturning Moment M O = k-ft Soil Bearing Pressure -
L / 3 = ft
Check Spread Footing Stability (1.0+0.14S DS )D + 0.7 W 0 Q E Reduced Moment (0.9-0.14S DS ) x M R
= k-ft Overturning Moment M O = k-ft
Load on Spread Footing
P (D+L) = = lb
P (Footing) = L x B x D x 150 pcf = lb
lb
lb
psf
Check Reinforcement Ratio
As,min = = in 2
As = = in 2
OK
0.0018 x A 2.94
12-#5 bars 3.72
A FTG = 28.33 ft 2 OK2,000
10,178
A REQ = 10,178 = 5.09 ft 2 <
2.8 OK
1,678
8,500
0.66 x M R 18.9 >
3 a B 3 (2.6')(5') psf < 2,600 psf OK
1.9 10.2 k
p MAX = 2 P = 2 (10.178 k) = 522
10.2 2.00
28.8 2.8
a = 28.8 k-ft 2.8 k-ft = 2.6 ft Resultant is inside the middle 1 / 3
Sway Fun Glider
1.7 5.67
8.5 5.00
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 24
project
CONSULTING
Engineers Inc. by job no. page no.
date
Loading For Anchorage Design
2. 1.2D + 1.6L 4. 1.2D + 1.0W + 1.0L 6. (1.2+0.2S DS )D + W 0 Q E + L R = lb R = lb R = lb
Vu = lb Vu = lb Vu = lb
Mu = lb-ft Mu = lb-ft Mu = lb-ft
Seismic Loading: Worst Case
Mu = lb-ft Vu = lb
S = ft N = bolts
= ft
T = lbs V = lbs
5020
83 6.92
726
2624
9 292
CH 25-090
9/30/2025 25
Sway Fun Glider
1707 1716 5020
2174 1934 2378
640 887 2624
RW
Sinnott Park
Playground Equipment Anchorage
project
CONSULTING
Engineers Inc. by job no. page no.
date
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 26
RW
Sway Fun Glider
project
CONSULTING
Engineers Inc. by job no. page no.
date
Sway Fun Glider
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 27
project
CONSULTING
Engineers Inc. by job no. page no.
date
Sway Fun Glider
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 28
project
CONSULTING
Engineers Inc. by job no. page no.
date
Sway Fun Glider
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 29
project
CONSULTING
Engineers Inc. by job no. page no.
date
Sway Fun Glider
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 30
project
CONSULTING
Engineers Inc. by job no. page no.
date
Wind Criteria
Appendix
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 31
RW
project
CONSULTING
Engineers Inc. by job no. page no.
date
Seismic Criteria
Appendix
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 32
project
CONSULTING
Engineers Inc. by job no. page no.
date
Geotech Seismic Criteria
Appendix
RW
Sinnott Park
Playground Equipment Anchorage
CH 25-090
9/30/2025 33
38077.0
0180\29080232.10
Page
2 of 2
142
appe
ndix “A”
CITY ST
ANDARD FORMS
APPENDIX
“A”
CITY STANDARD FORMS
The con
tractor shall submit the required documents using the City forms shown in Appendix A
38077.00180\29080232.10
271 APPENDIX “A”
City’s standard forms
CITY OF MILPTIAS TRUCK ROUTE MAP
38077.00180\29080232.10
272 APPENDIX “A”
City’s standard forms
SPECIAL EQUIPMENT PLATE
38077.00180\29080232.10
273 APPENDIX “A”
City’s standard forms
38077.00180\29080232.10
274 APPENDIX “A”
City’s standard forms
38077.00180\29080232.10
275 APPENDIX “A”
City’s standard forms
38077.00180\29080232.10
276 APPENDIX “A”
City’s standard forms
38077.00180\29080232.10
277 APPENDIX “A”
City’s standard forms
NOTICE OF INTENT TO AWARD CONTRACT
Department of Public Works
Project Name:
City Project Number:
Bid Opening Date:
NOIA Posting Date:
Project Manager:
NOIA Posting Location:
278
On _________, 2026, the City of Milpitas (City) held a bid opening for the upcoming _______________________________________ Project. The City intends to award the Project contract to the lowest responsive bidder, ___________________________________________, at the ____________________________, City Council Meeting.
As per Milpitas Municipal Code (MMC) MMC 1-2-3.19 - Protest Procedure, Any interested party may file a protest to a proposed award of a contract in an amount over Ten Thousand Dollars ($10,000). The protest shall be filed with the Purchasing Agent in writing no later than seven (7) calendar days after the posting of the Notice of Intent to award and shall set forth the basis for the protest and any proposed remedy.
All protests shall be in writing and shall contain a complete statement of the legal grounds for the protest; all the facts relevant to the protest; and the form of relief requested and the legal basis
for such relief. All protests shall be accompanied by all documentation supporting the grounds for the protest. The protest shall include the name, address and telephone number of the protesting party and the person representing the protesting party, if any.
Protests may be submitted only by a party that has submitted a bid or proposal in response to the contract solicitation. A subcontractor of a bidder or proposer may not submit a protest. A party may
not rely on a protest submitted by another party but must timely pursue its own protest.
Protests can only be submitted by the party that submitted the bid by one of the following methods:
Via mail or hand delivered, Monday thru Friday, between 8:00 a.m. and 5:00 p.m. to:
Attn: Luz Cofresi-Howe,
Finance Director
455 E. Calaveras Blvd,
Milpitas, CA 95035
OR, via e-mail @ [email protected]
38077.00180\29080232.10
279 APPENDIX “A”
City’s standard forms
Attn:
Subject: Notice of Award – Project – Project Nos.
Dear:
The Milpitas City Council, at its meeting of__________, has awarded the subject project to your company, the lowest responsible, and responsive bidder. The City is awarding the base bid contract for this project for a total contract amount of $_________. Attached to this letter are the following documents, which require the signature of representatives of your company and the required number of copies:
1 Contract (2 copies)
2. Performance Bond (2 copies)
3. Payment Bond (2 copies)
4. Bonding Company Data Sheet (1 copy)
5. Certificate of Insurance (1 copy)
6. Insurance Company Data Sheet (1 copy)
7. Certificate of Worker’s Compensation Insurance (1 copy)
8. Certificate relating to Worker’s Compensation Insurance (1 copy)
9. Worker’s Compensation Insurance Company Data Sheet (1 copy)
10. City Business License Application (Contractor to pay the fee) (1 copy)
11. Taxpayer Identification Number and Certification (1 copy)
12. Apprenticeship Standards (1 copy)
13. Urban Runoff Prevention, BMP, SWPPP Acknowledgement (1 copy)
14. Contractor’s Organization Chart (1 copy)
Please return the fully executed construction contract, bonding, insurance, and other related contract documents to my attention at your earliest convenience, but no later than 14 calendar days after receipt of this document, ___________, 2026. Additionally, the first chargeable day of
the contract _____________, 2026, is 21 calendar days, following the date of the Contractor ’s receipt of the Notice of Award letter, regardless of the Contractor's progress in completing all the items.
In addition, submit a construction schedule, staging plan and haul route, advance public notification, and other items for review (refer to the Special Conditions and Technical Provisions for additional items). Please read through the directive as there will be other requirements. _________________ with the City of Milpitas will be the Construction Manager for this project.
Their
contact information is [email protected]. Please contact them to schedule a pre- construction conference. Your attention is directed to Specification Section 00 72 13, Article 3, which requires the attendance of the Contractor’s Representative and Job Superintendent at the pre-construction conference. Please be advised that no work may proceed until the contract documents have been fully executed and your copy of the notice to proceed is issued to you.
Sincerely,
38077.00180\29080232.10
280 APPENDIX “A”
City’s standard forms
CITY OF MILPITAS
DEPARTMENT OF CONTRACT DOCUMENTS
REQUIREMENTS FOR CONTRACT DOCUMENTS
All contract documents for Public Works contracts shall be on the forms furnished by the City.
The following is an outline of requirements for execution of documents by the contractor, the surety company and the insurance company.
I. CONTRACT (Submit Two Original Documents)
1. Signed by: Corporate Officer or General Partner beneath typed name of contracting party.
2.Notarial Acknowledgment Certificate: Required for all copies. Use appropriate certificate for either individual, partnership or corporation. Date must not precede the date of the contract.
II. PERFORMANCE & PAYMENT BOND (LABOR AND MATERIALS) (Submit Two Original Documents)
1.Signed by:
a) Contractor: Corporate Officer or General Partner beneath typed name of contracting party. b) Surety: Attorney-in-Fact or Authorized Agent beneath typed name of surety.
2.Notarial Acknowledgment Certificate: Required for both contractor and surety for all copies.
Use appropriate certificate for either individual, partnership or corporation. Date must not precede the date of the contract.
III. INSURANCE CERTIFICATE (Submit One copy)
1.Signed by: Attorney-in-Fact or Authorized agent of insurance company beneath typed name of insurer.
2.Notarial Acknowledgment Certificate: Required if Certificate is executed outside of California.
3.Insurance to be validly in force for expected construction period.
IV. INSURANCE AND BONDING COMPANY DATA SHEET (Submit One copy each)
1. Completed and signed by: Authorized representative of each insurance company and each surety company. Must be signed by same person signing bonds or certificate. Be sure to insert State license number.
2. Submit Payment Bond Certificates from Insurance Commissioner and County Clerk as specified.
V. CERTIFICATE RELATING TO WORKMEN’S COMPENSATION INSURANCE (Submit One copy)
1.Signed by: Corporate Officer or General Partner of the Contractor.
VI. CERTIFICATE OF WORKER’S COMPENSATION INSURANCE (Submit One copy)
1.Signed by: Attorney-in-Fact or Authorized agent of insurance company.
38077.00180\29080232.10
281 APPENDIX “A”
City’s standard forms
2.Notarial Acknowledgment Certificate: Not Required.
3.Attach insurance company certificate form, which must comply with language on City form exactly (as required by State law).
When documents have been properly executed, return all copies to the City. The contractor’s copy of documents will be returned upon execution by the City.
38077.00180\29080232.10
282 APPENDIX “A”
City’s standard forms
NOTICE TO PROCEED
Date: _____________________
TO: _____________________________________________
ADDRESS: _______________________________________
PROJECT: ________________________________________
You are notified that the Contract Time under the above contract will commence to run on _____________________. By that date, you are to start performing your obligations under the Contract Documents. In accordance with Section D, the date of final completion is _____________________.
Before you may start any Work at the site, you must: (conditions if applicable)
________________________________________________________________________
________________________________________________________________________
CITY OF MILPITAS,
A Municipal Corporation
By :
Title:
38077.00180\29080232.10
283 APPENDIX “A”
City’s standard forms
38077.00180\29080232.10
284 APPENDIX “A”
City’s standard forms
SUBMITTAL COVER SHEET
SUBMITTAL NO. : DATE SUBMITTED:
PROJECT:__________________________________ PROJECT #:
FROM: GENERAL CONTRACTOR TO: CITY OF MILPITAS
ENGINEERING DIVISION
455 E. CALAVERAS BLVD.
MILPITAS, CA 95035
Phone #: Attn.__________________
Specification Check If Substitution
Item Section/Plan Sheet Submittal Description or Exception Comment / Date Required
1 2
3 4
_______________________________________________________________________________ I certify that this submittal is in conformance with the requirements of the Contract Documents and is not in conflict with other submittals. Any proposed submittal substitution or exception is fully indicated within the submittal, and the proposed substitution or exception is in compliance with the Contract Documents. __________________________________
General Contractors Signature
DESIGN CONSULTANT RESPONSE: Date Received:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Reviewer: ____ Date Transmitted to City: _____________________________
CITY RESPONSE: Date Received: _____
NO EXCEPTIONS NOTED – The City does not find any exceptions to the submittal, relying solely upon information provided in the submittal including the contractor’s certification, and subject to its compatibility with future submittals and additional partial submittals for portions of the work not covered in this submittal. Does not constitute acceptance or deletion of specified or required items not shown in a partial submittal.
MAKE CORRECTIONS NOTED – The same as above, except that minor corrections as noted by the Engineer shall be made by the Contractor. No resubmittal is required.
REVISE AND RESUBMIT – Rejected due to noncompliance with the requirements of the project plans and Specifications because of major inconsistencies or errors which shall be resolved or corrected by the Contractor prior to subsequent review by the Engineer.
SUBMIT SPECIFIED ITEM – Submittal is rejected because the submitted material does not conform to the requirements of the project plans and specifications in major respects. This material is not to be resubmitted, and it is expected that the material specified in the project plans and specifications be submitted.
City Reviewer: Date:
38077.00180\29080232.10
285 APPENDIX “A”
City’s standard forms
REQUEST FOR INFORMATION
RFI #: __________ DATE CREATED:
PROJECT:_________________________________ PROJECT #:
FROM: GENERAL CONTRACTOR TO: CITY OF MILPITAS
ENGINEERING DIVISION
455 E. CALAVERAS BLVD.
MILPITAS, CA 95035
Phone #: ATTN.:
Subject:
INFORMATION REQUESTED: Date Required:
Specification/Plan Sheet Reference:
I certify that this is not a frivolous Request For Information and that I have completely reviewed all project Contract Documents and to the best of my professional judgment have determined that the information requested is not obvious or found.
______________________________________
General Contractor Signature
________________________________________________________________________________
DESIGN CONSULTANT RESPONSE: Date RFI Received:
Response by Date Answered
______________________________________________________________________________
CITY RESPONSE: Date RFI Received:
Response by Date Answered:
38077.00180\29080232.10
286 APPENDIX “A”
City’s standard forms
NOTICE OF NON-COMPLIANCE
Date & Time Issued:
To: _______________________
_______________________
_______________________
Project: _________________________________ Project Number: _______
In accordance with General Conditions of the Project Specifications, you are hereby notified that the following work is defective and does not comply with the requirements of the Project Contract Documents: __________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ Work found to be defective or not in compliance with the Contract Documents shall not be paid for by the City, and it shall be the Contractor's responsibility to remove and replace the defective Work at no additional cost to the City. The Contractor shall determine what corrective action is necessary to bring the Work into compliance, and shall notify the Engineer prior to starting corrective action.
City Project Manager:
City Inspector:
Notice of Non-Compliance was received by: / /
38077.00180\29080232.10
287 APPENDIX “A”
City’s standard forms
FIELD MEMORANDUM
Date: _______________________ Page 1 of
To: _______________________
From: _______________________
Project: _____________________________________________________________ Subject: _____________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ Disclaimer:
All work shall be done in accordance with the Contract Documents. The written direction above provides clarification only. The Contractor acknowledges that any additional cost shall be authorized in advance in a fully executed Contract Change Order.
_______________________________
Signature
CC:
38077.00180\29080232.10
288
Project Punchlist
Project:_________________________
Contractor:______________________
Punchlist Acknowledged:__________
Project Eng.:___________________ Inspector:____________________ Date:_____________ Item Date Item
Entered
Description Item
Completed
Date Initial
Part A Standing Items
1 The contractor shall submit a full set of As-built /Record Drawings showing the work performed and pothole information. Include contractor’s signature, contractor’s name, state license # and phone # of general contractor name and subcontractors-paving, striping, loops on the title sheet.
2 Submit written warranties in accordance with the Specifications:
Warranty bonds from surety and contractor’s letterhead for warranty per appendix sample-page 151.
If not applicable check here.
3 Operation/Maintenance Manuals have been received in full numbers specified.
If not applicable check here.
4 Deliverables (i.e. special tools or spare parts) have been received as specified.
If not applicable check here.
5 Training has been performed as specified.
If not applicable check here.
6 Verify that all Building Permits have been signed off.
If not applicable check here.
7 Verify Certificate of Monumentation has been received.
If not applicable check here.
8 Ordinance 238 (Landscape/Sprinkler has been completed).
If not applicable check here.
9 Verify that Planning Department Conditions have been met.
If not applicable check here.
10 Compliance with Special Conditions
If not applicable check here.
11 Compliance with Reclaimed Water Requirements
If not applicable check here.
12 Submit lien releases from all subcontractors and suppliers. 13 Submit complete certified payroll.
38077.00180\29080232.10
289
Item Date Item
Entered
Description Item
Completed
Date Initial
Part B Project Specific Items
14 Construction Water Meter(s) returned.
38077.00180\29080232.10
290
ESCROW AGREEMENT
SECURITY DEPOSITS IN LIEU OF RETENTION
This Escrow Agreement is made and entered into effective (date) ___________by and between City of Milpitas whose address is 455 E Calaveras Blvd. Milpitas, CA 95035-5479 hereinafter called “Owner,” whose address is hereinafter called “Contractor” and whose address is hereinafter called “Escrow Agent.” For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for _____________ in the amount of ____________________ dated _________________ (hereinafter referred to as the “Contract”).
Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of Owner and shall designate the Contractor as the beneficial owner.
(2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.
(3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
(4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent.
(5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner.
(6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor.
38077.00180\29080232.10
291
(7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
(9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant in Sections (5) to (8), inclusive, of this Agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and interest as set forth above.
(10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of the Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:
On behalf of Owner: On behalf of Contractor:
City Manager
Title Title
Name Name
Signature Signature
Address Address
On behalf of Escrow Agent:
Title
Name
Signature
Address
38077.00180\29080232.10
292
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.
Owner Contractor
Title Title
Name Name
Signature Signature
38077.00180\29080232.10
293
COST PROPOSAL FORM (See General Conditions, Contract Change Orders)
Date: ________________ Project Number
______________
In Response To ___________________ (RFP #, etc.)
To: City of Milpitas
455 East Calaveras Boulevard
Milpitas, CA 95035
Brief description of change(s):
ITEM DESCRIPTION PRIME
CONTR.
SUB 1
SUB 2
SUB 3
TOTAL
Material
Direct Labor Cost
Equipment
Other (Specify) Extended
Overhead
Total Cost
Subcontractor’s Overhead and
Profit (15% max)
Contractor’s Overhead and
Profit on Labor & Materials (15%
max)
Contractor’s Overhead and
Profit on Equipment (10% max)
Mark-Up for Subcontractor’s
work (5% max)
Bonds
(% of total cost above not
including any O/P)
GRAND TOTAL
REQUESTED CHANGE IN CONTRACT TIME (DAYS)
By: _________________________________ (Firm Name)
Signature: ___________________________ Date: ________________
38077.00180\29080232.10
294
Title: _______________________________
City of Milpitas
455 E. Calaveras Boulevard
Milpitas, California 93035
CHANGE ORDER FORM
CONTRACT CHANGE ORDER NO. __
Date: [INSERT]
To: [CONTRACTOR NAME]
[ADDRESS]
[ADDRESS]
Attn: [CONTRACTOR REP]
Project: [INSERT]
This Change Order covers changes to the contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for the amount agreed upon between the Contractor and City of Milpitas and set forth herein.
Item
No. Description of Changes
Increase/
(Decrease)
in Contract
Amount
Contract
Time
Extension,
Days
1 2
Totals $
Original Contract Amount: $XX.00
Change by Previous Change Order(s): $XX.00
Contract Price Prior to this Change Order: $XX.00
Current Change Order Amount: $XX.00
Revised Contract Amount including this Change Order: $XX.00
38077.00180\29080232.10
295
The Contract Price and Contract Time shall be adjusted as set forth above. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City.
Contractor accepts the terms and conditions stated above as full and final settlement of any and all claims arising out of or related to the subject of this Change Order and acknowledges that the compensation (time and cost) set forth herein comprises the total compensation due for the work or change defined in the Change Order, including all impact on any unchanged work. By signing this Change Order, the Contractor acknowledges and agrees that the stipulated compensation includes payment for all Work contained in the Change Order, plus all payment for any acceleration or interruption of schedules, extended overhead costs, delay, and all impact or cumulative impact on all Work under this Contract. The signing of this Change Order acknowledges full mutual accord and satisfaction for the change and that the stated time and/or cost constitute the total equitable adjustment owed the Contractor as a result of the change. The Contractor hereby releases and agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim or request for equitable adjustment of any type, for any reasonably foreseeable cause that shall arise out of, or as a result of, this Change Order and/or its impact on the remainder of the Work under the Contract.
Accepted:
(Signature) Contractor’s Authorized Representative Date Recommended:
(Signature) [**INSERT NAME, TITLE**] Date
Approved:
(Signature) [**INSERT NAME, TITLE**] Date
This Contract Change Order consists of 2 pages and any exhibits attached to this Contract Change Order shall not be part of the Contract Change Order unless specifically initialed by or on behalf of both the Contractor and the City of Milpitas.
Contract Change Order #
38077.00180\29080232.10
296
WEEKLY STATEMENT OF DAYS CHARGED TO CONTRACT
City of Milpitas
Engineering Division
Date:___________
Project:____________________________________________________Project No. ___________
Weekly Statement No. :___________
Notice of Project Award Issued:____________, Notice To Proceed Issued: ____________
The following statement shows the number of ____________________ days charged to the contract
(Calendar or Working)
for the week ending: _____________.
1. First chargeable day of the Contract: ___________________
2. Number of Days in the Contract: ___________________
3. Contractual completion date: ___________________
( = #1 + #2)
4. Days added by Contract Change Order: ___________________
5. Days not charged to Contract (note reason below): ___________________
6. Revised completion date based on #4 and/or #5: ___________________ ( = #3 + #4 + #5)
Total number of Days charged to the Contract as of this Statement:___________________
Total number of Days remaining as of this Statement: ___________________
Notes:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ________________________
_________________________ __________________________ City Project Manager City Inspector
Refer to Special Conditions of the Contract Documents. The Contractor has fifteen (15) days to submit written protest of this Statement to the Engineer; otherwise, this Statement shall be deemed to have been accepted by the Contractor.
Accepted By: _____________________________________
Contractors Signature
38077.00180\29080232.10
297
SAMPLE PROGRESS PAYMENT FORM
Refer to the Special Conditions regarding requirements for requesting Progress Payments.
38077.00180\29080232.10
298
Contractor’s Letter Head
GUARANTY / WARRANTY
TO: CITY OF MILPITAS, for the (project name), Project (#), in Milpitas, CA.
The undersigned guarantees all construction performed on this project and also guarantees all material and equipment incorporated therein Contractor hereby grants to Owner for a period of one (1) year following the date of acceptance of the Work by the City of Milpitas or such longer period specified in the Contract Documents, its unconditional warranty of the quality and adequacy of all of the Work including, without limitation, all labor, materials and equipment provided by Contractor and its Subcontractors of all tiers in connection with the Work.
Neither final payment nor use or occupancy of the Work performed by the Contractor shall constitute an acceptance of work not done in accordance with this Guaranty or relieve Contractor of liability with respect to any express warranties or responsibilities for faulty materials or workmanship. Contractor shall remedy any defects in the Work and pay for any damage resulting there from which shall appear within one (1) year, or longer if specified, from the date of acceptance as described above.
Should any of the materials or equipment prove defective or should the Work as a whole prove defective, due to faulty workmanship, material furnished or methods or installation, or should the Work or any part thereof fail to operate properly as originally intended and in accordance with the Contract Documents due to any of the above causes within one (1) year after date of acceptance, or such longer period specified in the Contract Documents, Contractor shall: (1) reimburse Owner, upon demand, for its expenses incurred in restoring said Work to the condition contemplated in the Contract Documents, including the cost of any such equipment or materials replaced and the cost of removing and replacing any other work necessary to make such replacement or repairs, or (2) upon demand by Owner, replace any such material and to immediately repair said Work completely without cost to Owner so that said Work will function successfully as originally contemplated.
Inspection of the work shall not relieve Contractor of any of its obligations under the Contract Documents. Even though equipment, materials, or work required to be provided under the Contract Documents have been inspected, accepted, and estimated for payment, Contractor shall, at its own expense, replace or repair any such equipment, material, or work found to be defective or otherwise not to comply with the requirements of the Contract Documents up to the end of the guaranty period.
Owner shall have the unqualified option to make any needed replacement or repairs itself or to have such replacements or repairs done by Contractor. In the event Owner elects to have said work performed by Contractor, Contractor shall make such repairs within a reasonable period of time after the receipt of demand from Owner; provided, however, that in no event shall such period exceed twenty-five (25) days.
All definition of terms used in this Agreement shall have the meanings set forth in the Project Specifications, Special Conditions, Definitions of Words and Terms.
38077.00180\29080232.10
299
The foregoing Guaranty is in addition to any other warranties by Contractor contained in the Contract Documents, and not in lieu of, any and all other liability imposed on Contractor under the Contract Documents and by law with respect to Contractor’s duties, obligations, and performance under the Contract Documents. In the event of any conflict or inconsistency between the terms of this Guaranty and any warranty or obligation of the Contractor under the Contract Documents or by law, such inconsistency or conflict shall be resolved in favor of the higher level of obligation of the Contractor.
CONTRACTOR:
Corporate
Seal:
Name of Firm
Signature Date
Title
___________________________________________
Signature Date
Title
38077.00180\29080232.10
300
CONSTRUCTION CHANGE DIRECTIVE NO:___
City of Milpitas
Engineering Division
Project Name Project No: ______________ PAGE 1 of
TO:_________________________________
FROM: ___________ DATE: _____________________
SUBJECT/ITEM:
____________________________________________________________________________
DESCRIPTION:
References:
Attachments:
CONSTRUCTION CHANGE DIRECTIVE INSTRUCTIONS:
The Contractor is directed to proceed with the above-described work without change in contract price.
The Contractor is directed to proceed with the above-described work and submit within the next 14 calendar days an itemized lump sum price and requested time extension, if any, to facilitate the review and settlement of this CCD in accordance with the Contract Documents. The cost of the work covered by this directive shall not exceed $. In the event that the cost of this work is anticipated to exceed the amount above, the Contractor will notify the City/Agency in writing and obtain additional authorization before proceeding.
The Contractor is directed to proceed with the above-described work on a time and material basis with a Not-To-Exceed Amount of $0.
Itemized time and material documentation shall be provided on a daily basis in accordance with the Contract Documents.
The Contractor shall be paid at bid item prices for the work performed.
The Contractor is directed to provide pricing for the above-described work within the next 7 calendar days. The Contractor shall not proceed with the work until authorized by written Contract Change Order.
AUTHORIZED BY: ACKNOWLEGEMENT OF RECEIPT:
City of Milpitas
OWNER CONTRACTOR:
BY: BY:
_______________________________________________________________________________________________________________________________________________________
SIGNED DATED SIGNED DATED
38077.00180\29080232.10
301
CONSTRUCTION RECYCLED WATER APPLICATION
Construction Meter Permit RW
TEMPORARY CONSTRUCTION METER FOR PURCHASE OF RECYCLED WATER* Please submit completed application to [email protected] Milpitas City Hall
455 East Calaveras Boulevard
Milpitas, CA 95035
(408) 586-3100
www.milpitas.gov
PLEASE COMPLETE AND SIGN APPLICATION
TYPE OF APPLICATION:
NEW
RENEWAL
RELOCATION
BUSINESS NAME: METER #
BILLING ADDRESS: READING WHEN TAKEN OUT
CONDITION WHEN TAKEN OUT PHONE NUMBER:
PROJECT NAME: STATE LIC CONTRACTOR # CLASS EXP DATE
PROJECT NUMBER: CITY BUSINESS #
BUILDING PERMIT #
ENCROACHMENT PERMIT #
PROJECT LOCATION (Site Address):
ASSIGNED INSPECTOR INSPECTOR SIGNATURE
I understand that this application is for temporary recycled water (through a construction meter) for the sole purpose of construction work at the address/location stated above and intended for use with the City of Milpitas’s fill-station sites. I further understand that the City has the right to remove the construction meter without prior notice if the meter is being used in an improper manner as determined by the City and will discontinue any water service to the properties until permanent water service is established. Time period for use of construction meter will expire upon the following (whichever occurs first): 1) 12 months, 2) Expiration of the permit, 3) Completion of the permitted work, or 4) Permanent water service is established. I also understand that the water supplied through the meter may be subject to frequent or indefinite interruptions at any time by the City.
I also understand that I am responsible for this meter and its usage until I give proper written notification to the City that the meter is to be removed and the City has the meter back in its possession. I also understand that I will operate the meter in a responsible manner so as not to cause damage to the meter and/or the water system and agree to be held accountable for any and all damage caused from improper operation of the meter. A missing or stolen water meter will be assessed at the current replacement rate. Payment for the meter replacement must be made at Milpitas City Hall before re-installation. I also understand that by the City issuing this temporary meter, this action in no way obligates the City to provide me with permanent water service to the subject property. I agree to place a deposit of $2,000 for the loan of the meter. I agree to forfeit part or all of the deposit to pay for any damage to the meter during the term of this agreement, and to forfeit the deposit in full if the meter is not returned on or before the expiration date. I understand that the deposit, less the water use and meter charges, will be returned upon return of the meter in satisfactory and working condition. No interest shall be paid on the deposited amount. Should water charges exceed the deposit amount, I agree to pay the additional charges upon demand. I agree to abide by all rules and regulations of the City of Milpitas Public Works Department and to pay a monthly meter charge of $ for each full or partial calendar month the meter is used, and to pay for all water used at the commercial rate in effect at the time ($ per hundred cubic foot and $ per unit for capital surcharge). If a water rate increase is approved during the rental period, the new rates will be in effect. In the event that I fail to keep satisfactory records, I agree to pay the City on the basis of an estimate made by the Accounting Officer of the City of Milpitas. I understand that a copy of this permit must be kept on hand at all times by the person taking water and must be available to show as evidence to any authorized representative of the City of Milpitas that a permit has been obtained.
Name Signature Date
OFFICE USE ONLY
Date meter is to be returned
Deposit $ Receipt #
Date meter is returned
Condition when returned
Accepted by
Reading when returned
(Permit Holder to Initial)
**ORIGINAL PERMIT MUST BE RETURNED WITH METER**
* Applicant must complete and submit South Bay Water Recycling Recycled Water Access Point User Agreement along with this application.
Please return all pages with application.
Distribution: Original – Finance Copies to: PW Utility Maintenance, Cashier, PW Inspector Temporary Permit No.
Date: , 20
Construction Meter Permit RW
Meter Log
Meter Serial Number:
Month Reading Reading Date
January
February
March
April
May
June
July
August
September
October
November
December
Please contact the Finance Department via email at [email protected] for any questions and for submitting your monthly readings of the meter.
General Questions – Please contact Utility Engineering at (408) 586-3350. Inspection Appointment – Please contact Public Works Inspector at (408) 586-3252. Billing Questions – Please contact the Finance Department at (408) 586-3100.
Revised 10/7/16 Page 1 of 2
___
___
___
___
___
___ ___
___ ___ ___ ___
RECYCLED WATER ACCESS POINT
PROGRAM USER AGREEMENT
PRODUCER: San Jose/Santa Clara Regional Wastewater Facility - 700 Los Esteros Road, San Jose CA 95134 REGULATORY AGENCY: South Bay Water Recycling - 3025 Tuers Road San Jose, CA 95121 - 408.277.3671
EFFECTIVE DATES OF PERMIT: TO License #: SJ-
USER INFO
TRAINEE NAME:
CSLB CONTRACTOR LICENSE #:
COMPANY NAME: TRUCK/TRAILER LICENSE #:
COMPANY ADDRESS:
COMPANY PHONE #:
ATTACH YOUR ACORD INSURANCE FORM TO THIS AGREEMENT
PLEASE GIVE THIS AGREEMENT TO YOUR OFFICE MANAGER
A USER AGREEMENT MUST BE COMPLETED FOR EACH VEHICLE OPERATOR AND MUST BE RETAINED DURING ACQUISITION AND APPLICATION OF RECYCLED WATER. USERS AND USERS’ COMPANIES SHALL ADHERE TO THE ATTACHED SBWR TERMS OF USE. USER AGREEMENT IS SUBJECT TO RWQCB ORDER 95-117.
RECYCLED WATER USE INFORMATION (CHECK ALL THAT APPLY)
METHOD OF WATER DISTRIBUTION:
APPLICATION METHOD:
USE OF RECYCLED WATER*:
SIGNS REQUIRED:
RECYCLED WATER ACCESS POINT TEMPORARY SITE METER OTHER:
TANKER TRUCK SPRAY HOSE OTHER:
CONSTRUCTION (COMPACTION/DUST CONTROL) STREET SWEEPING SEWER CLEAN OUT OTHER*:
* REFER TO THE FULL TEXT OF THE LATEST VERSION OF TITLE-22: CALIFORNIA WATER RECYCLING CRITERIA, ARTICLE 3. USES OF RECYCLED WATER, JUNE 18, 2014.
TANKER TRUCK CONTAINER OVERHEAD TANK PROJECT SITE OTHER :
LOCATION WHERE RECYCLED WATER WILL BE APPLIED:
ADDRESS: SITE SUPERINTENDENT:
CERTIFICATION
I HEREBY CERTIFY THAT THE INFORMATION PROVIDED IN THIS APPLICATION AND ALL ATTACHMENTS ARE TRUE, ACCURATE, AND COMPLETE TO THE BEST OF MY KNOWLEDGE. I ALSO CERTIFY THAT I HAVE READ AND AGREE TO ABIDE BY THE SBWR TERMS OF USE AND ALL APPLICABLE RULES AND REGULATIONS OF THE RWQCB ORDER NO. 95-117 AND HAVE SUCCESSFULLY COMPLETED INSPECTION BY THE LOCAL RETAILER.
TRUCK CONTRACTOR/DRIVER/EMPLOYEE SIGNATURE PRINTED NAME TITLE DATE
** SUPERINTENDENT OR FOREMAN SIGNATURE PRINTED NAME TITLE DATE
LYLE FROHMAN
SBWR SIGNATURE PRINTED NAME DATE
Revised 10/7/16 Page 2 of 2
_
_
_
_
_
_
_
_
_
RECYCLED WATER ACCESS POINT PROGRAM
TERMS OF USE
CHECK THIS USER AGREEMENT LIMITS THE USE OF RECYCLED WATER TO THE FOLLOWING CONDITIONS:
1. RECYCLED WATER IS FOR NONPOTABLE USES ONLY - NO DRINKING! Recycled water may not be exposed to food, used within designated eating areas or used within 50 feet of any domestic well, drinking fountain or potable water supply.
2. There shall be no cross-connection between recycled water and any potable water supply. Recycled water may not be plumbed into potable irrigation or onsite plumbing systems. Recycled water meters are prohibited from connecting to potable hydrants. Match purple to purple only
3. Recycled water may not be discharged into storm drains or outside the designated use area that was approved by the water retailer and/or SBWR. Overspray, pooling and runoff of recycled water is not permitted. Cover this in your Safety meetings.
4. Tanker trucks must maintain an air gap of at least twice the diameter of the fill pipe (i.e. water overflows the tank before reaching the fill pipe). Tanker trucks must have water-tight connections, piping and hoses to ensure no leakage will occur during fill-up or use. They must be fully drained before transport and prior to every connection.
5. Recycled water tanker trucks may not transport potable water for potable uses.
6. All tanker trucks accessing and hauling recycled water must satisfy local and state safety requirements. Active auto/truck/trailer and general liability insurance (i.e. an ACORD form) is required.
7. Recycled water meters may be inspected by the retailer for appropriate use at any time. The volume of recycled water used must be reported as specified by the recycled water retailer.
SPECIAL APPROVAL, TRAINING AND SITE INSPECTION REQUIRED
8. If recycled water is transferred to other storage containers/reservoirs, they must be labeled with signage equivalent to tanker truck signage and must follow the safety guidelines in this User Agreement.
9. Recycled water may be used for pressure washing and washing equipment and vehicles if the recycled water is not heated and where the general public is excluded from the washing process.
10. Recycled Water may not be used for directional drilling without prior approval from SBWR.
ADVISORY SIGNS
Tanker Truck Sign: Tanker trucks hauling recycled water must have an SBWR approved adhesive sign issued by retailer at least six inches by twelve inches on the tank, in a location clearly visible to users and workers, with the following wording in one inch, or larger, letters on a purple background.
Tanker Truck Inspection Decal: Tanker trucks hauling recycled water must have an SBWR approved adhesive decal issued by retailer at least three inches by six inches signifying that the tanker truck has passed inspection and met all SBWR requirements.
Appurtenance Sign: Appurtenances serving recycled water must have an SBWR approved adhesive or bolted sign issued by the retailer at least six inches by eight inches, in a location clearly visible to users and workers, with the following wording in one inch, or larger, letters on a purple background.
PLEASE WASH YOUR HANDS AFTER USING RECYCLED WATER
South Bay Water Recycling
Recycled Water Access Point Program
Fact Sheet
Expanding Recycled Water Use with Recycled Water Access Points (RWAP) To conserve our valuable drinking (potable) water supplies, South Bay Water Recycling (SBWR) has made recycled water available for commercial non-potable uses at several truck fill locations in San José and Milpitas. State Approved uses include construction activities such as grading, compaction, concrete wetting, and dust control as well as landscape irrigation, pressure washing, and sewer flushing.
Recycled Water Quality
Recycled water is highly treated to meet rigorous and protective standards set by the State Water Resources Control Board – Division of Drinking Water, and SBWR currently supplies clean and safe tertiary-treated recycled water to over 750 customers in San Jose, Milpitas and Santa Clara.
Participation Requirements
Users must complete a short Training and sign a User Agreement to confirm the correct use of the fill stations and the proper handling of recycled water. In addition, trucks must be inspected and labeled to certify that they are correctly equipped to transfer recycled water.
After truck and driver certification, users will be issued a portable recycled water meter, with a unique nozzle that can only fit the RWAP hydrants. This minimizes the possibility of cross- connections between the potable and recycled water distribution systems.
Construction exemptions for required use of recycled water may be granted on a case by case basis, depending on the availability of recycled water near the project site. Please contact the City Planning Department for more information on the required use of recycled water for proposed projects.
Getting Started
In order to complete the certification process, and receive meters, site keys, and the most updated site maps, please contact the recycled water retail agencies listed below:
Milpitas – call (408) 586-2600
San Jose –call (408) 277-3671
RWAP Supervisor Trainings are scheduled every Wednesday morning from 9am-11am at the San Jose/Santa Clara Regional Wastewater Facility (700 Los Esteros Road in San José) or by appointment. Contact the City of Milpitas for trainings and inspections in their area.
Revision 0223015
South Bay Water Recycling
Recycled Water Access Point
FAQs
1. What is a Recycled Water Access Point?
A Recycled Water Access Point (or RWAP) is a stand-pipe that allows a certified RWAP Supervisor access to recycled water to fill their tanker truck.
2. How can I get locations and information about using recycled water from an RWAP? Please contact your local water retailer or South Bay Water Recycling for availability in your area.
City of Milpitas – (408) 586-2600
City of San José – South Bay Water Recycling (408) 277-3671
3. What are the uses for recycled water?
Recycled water is approved for nonpotable (non drinking) uses such as irrigation, dust control, and street sweeping
4. Can I use recycled water to irrigate my landscape at home? No. Recycled Water is approved only for commercial (non-residential) uses.
5. Can I drink recycled water?
No.
At this time, recycled water is not approved for drinking.
6. Do I have to use recycled water?
The use of recycled water is required by many city ordinances if recycled water is available. Visit your local city’s planning department for availability in your area.
7. Where does recycled water come from?
Recycled water is produced from treated wastewater from the San Jose/Santa Clara Regional Wastewater Facility.
8. Why is recycled water regulated more than potable (drinking) water? Recycled water is safe to use by trained personnel to assure it is used appropriately and that the public drinking water supply is separated and protected from contamination.
9. Are there any rules I need to follow when using recycled water? Recycled water has not been treated and disinfected for drinking. The use of recycled water is therefore regulated by the State of California Division of Drinking Water, State Water Resources Control Board to ensure that the public health and potable water supply are separated and protected from contamination. To assure that the use is appropriate, the State has required that users be trained, vehicles and sites are inspected and certified, and appropriate safeguards are in place to protect public health.
10. Do I have to use a special container?
All containers must be properly labeled, per the SBWR RWAP User Agreement. Recycled water is only distributed to certified RWAP Supervisors with registered trucks that have been inspected.
11. Can I store recycled water at my site or commercial business? Yes. Recycled water can be stored on site, with appropriate signage and use management per the User Agreement.
12. Do I have to get certified in multiple cities or will one certification work at all SBWR locations? Recycled Water Access Point Supervisors can be trained and registered at any qualified SBWR water agency.
13. Can I take the recycled water I picked up in one city and take it to another city? Yes. Recycled water purchased from one city may be used in a different city.
14. Can I use a potable meter to access recycled water or do I have to get a special meter? The RWAP meter is different from a potable water meter, so you must use a recycled water RWAP meter when accessing recycled water.
15. Do I need to clean my tank or container before filling it with potable water? Recycled water trucks must be certified and registered to carry water for nonpotable uses only.
16. What if I have multiple tanker trucks?
All trucks must be inspected and registered with SBWR.
17. How much does recycled water cost?
Please contact your water retailer for prices and availability.
18. How do I report my recycled water usage and pay?
It will vary depending on recycled water retailer. Please see your local recycled water retailer for specifics.
Bid Dat
e: 03/03/2026
CITY OF MILPITAS BID SUMMA
RY
PUBLIC WORKS - ENGINEERING DIVISION Apparent Low Bidder Item DESCRIPTION QTY UNIT Item Total Item Total Item Total Item Total Item Total Item Total Item Total Item Total Item Total Item Total Item Total Item Total Item Total 1 Mobilization/Demobilization (5% max) 1 LS $60,931.00 $50,000.00 $8,824.00 $55,000.00 $55,312.73 $45,000.00 $50,000.00 $60,000.00 $65,000.00 $65,000.00 $67,279.00 $60,000.00 $65,000.00 $78,700.00 2 Site Preparation - Temporary Construction Fencing, Tree Protection, and Traffic Control 1 LS $22,250.00 $18,000.00 $23,529.00 $39,320.00 $26,162.23 $25,000.00 $18,500.00 $15,000.00 $10,000.00 $25,000.00 $120,023.00 $5,000.00 $50,000.00 $30,000.00 3 Storm Water Pollution Control + Erosion Control 1 LS $10,000.00 $15,000.00 $8,824.00 $5,500.00 $26,547.29 $8,500.00 $12,500.00 $17,000.00 $10,000.00 $20,000.00 $12,710.00 $18,000.00 $15,000.00 $25,700.00 4 Sheeting, Shoring, and Bracing or Equivalent Method 1 LS $16,200.00 $8,000.00 $5,882.00 $6,500.00 $2,613.32 $6,500.00 $12,500.00 $1,100.00 $500.00 $5,000.00 $2,500.00 $5,000.00 $25,000.00 $15,000.00 5 Demolition 1 LS $89,770.00 $90,000.00 $76,176.00 $65,270.00 $64,366.08 $73,000.00 $80,000.00 $100,000.00 $115,000.00 $80,000.00 $95,207.00 $85,000.00 $100,000.00 $199,600.00 6 Earthwork - Rough Grading, Fine Grading, Imported Soil 1 LS $55,170.00 $30,000.00 $74,557.00 $72,400.00 $22,582.37 $52,000.00 $15,000.00 $120,000.00 $105,000.00 $30,000.00 $70,004.00 $85,000.00 $200,000.00 $87,000.00 7 Storm Drainage Improvements 1 LS $69,700.00 $50,000.00 $26,675.00 $48,200.00 $103,696.94 $49,000.00 $50,000.00 $70,000.00 $52,000.00 $60,000.00 $60,377.00 $85,000.00 $50,000.00 $98,000.00 8 Resilient Rubber Surfacing over Class 2 Permeable Rock 1 LS $297,450.00 $310,000.00 $356,471.00 $328,000.00 $348,842.02 $310,000.00 $300,000.00 $335,700.00 $395,000.00 $369,000.00 $348,650.00 $420,000.00 $350,000.00 $318,000.00 9 Concrete Improvements 1 LS $30,500.00 $25,000.00 $29,027.00 $46,400.00 $36,840.21 $52,000.00 $45,000.00 $44,000.00 $35,000.00 $25,000.00 $45,355.00 $25,000.00 $60,000.00 $52,000.00 10 Play Area Fence and Gate 1 LS $87,100.00 $130,000.00 $100,000.00 $110,110.00 $112,445.76 $132,000.00 $110,000.00 $100,000.00 $95,000.00 $150,000.00 $100,468.00 $120,000.00 $100,000.00 $134,000.00 11 Decomposed Granite Paving and Headerboard 1 LS $72,850.00 $24,000.00 $35,592.00 $103,975.00 $39,061.34 $67,135.00 $65,000.00 $59,000.00 $60,000.00 $50,000.00 $47,919.00 $85,000.00 $40,000.00 $64,000.00 12 Playground Equipment 1 LS $425,000.00 $410,000.00 $452,940.00 $314,159.00 $432,403.32 $462,000.00 $500,000.00 $400,000.00 $404,000.00 $450,000.00 $452,543.00 $495,000.00 $450,000.00 $418,000.00 13 Site Furnishings 1 LS $23,300.00 $15,000.00 $8,355.00 $10,500.00 $27,104.55 $15,000.00 $25,000.00 $24,500.00 $23,000.00 $30,000.00 $23,234.00 $15,000.00 $30,000.00 $12,000.00 14 Irrigation System and Planting 1 LS $17,830.00 $28,000.00 $23,529.00 $31,645.00 $24,888.96 $32,000.00 $60,000.00 $17,000.00 $25,000.00 $60,000.00 $21,011.00 $10,000.00 $20,000.00 $34,000.00 15 90-days Maintenance Period 1 LS $1,500.00 $5,000.00 $5,865.00 $9,500.00 $5,782.60 $2,000.00 $5,000.00 $4,500.00 $3,000.00 $3,000.00 $3,300.00 $4,500.00 $5,000.00 $8,000.00 $1,279,551.00 $1,208,000.00 $1,236,246.00 $1,246,479.00 $1,328,649.72 $1,331,135.00 $1,348,500.00 $1,367,800.00 $1,397,500.00 $1,422,000.00 $1,470,580.00 $1,517,500.00 $1,560,000.00 $1,574,000.00 Description
Play Equipment Installation
Rubber Protective Surfacing / PIP/
Install Safety Surfacing
SWPP
Fence & Gates
Landscape
Land Surveying/Staking
Trucking
Concrete / Demo Earthwork
All Commercial Fence
Star Construction, Inc
R.E. Schultz
Construction, Inc. Star Construction, Inc
Epic Land Surveying
FLEX Ground
Suarez & Munoz
Construction, Inc
Tree to Green
Landscape
Creative Builders
BASE CONTRACT WORK
CWS Construction
Group, Inc
Galeb Paving, Inc
G & G Builders
Engineer's Estimate
S&H Construction, IncSuarez & Munoz
Construction, Inc
Interstate Grading &
Paving, inc
Redwood Engineering
Construction
Mark Lee & Yong Kay
Inc DBA
Bay Construction Co
R.E. Schultz
Construction, Inc.
S&H Construction, Inc
Playground Unlimited
Mark Lee & Yong Kay
Inc DBA
Bay Construction Co
Creative Builders
Redwood Engineering
Construction
All Commercial Fence
Gametime
Galeb Paving, Inc
Los Loza, Inc
All Commercial Fence
Los Loza, Inc
Raposo Engineering,
Inc
Interstate Grading &
Paving, inc
Gametime (equipment
only)
Ramcon Corporation
CWS Construction
Group, Inc
Epic Land Surveying
USA Trucking, inc
Ramcon Corporation
Creative Builders
Raposo Engineering,
Inc
Playground Unlimited
Security Contractor
Services
Frank and Grossman
Landscape Contractors,
Inc
Robertson Recreational
Surfaces
A1 trucking Services, Inc
Belmonte's Conrete
Services, Inc
Creative Builders
Construction Survey, Inc
G & G Builders
Playground Unlimited
AAA Fence Company,
Inc
Mike O'Dell Surveys
Los Loza, Inc
Playground Unlimited
Freeman Environmental
Company
All Commercial Fence AAA Fence Company,
Inc
Playground Unlimited
(rubber + install
equipment)
All Commercial Fence AAA Fence Company,
Inc
Tree to Green
Landscape
Playground Unlimited
AAA Fence Company,
Inc
AAA Fence Company,
Inc
Playground Unlimited
Epic Land Surveying
Bosco Construction
Services, Inc
Bosco Construction
Services, Inc
Robertson Recreational
Surfaces
Western State B
uilders,
Inc
Western State B
uilders,
Inc
GT I
mpax
List of
Sub-Contractors
Project Nam
e: SINNOTT PARK PLAYGROUND RENOVATION
Project No.: 3471
AAA Fence Company,
Inc
Frontline General
Engineering
Construction, Inc
MRC Recreation (FLEX
Ground)
Frontline General
Engineering
Construction, Inc
1
NOTICE OF INTENT TO AWARD CONTRACT
Department of Public Works
Project Name:
Sinnott Park Playground Renovation
City Project Number:
34 71
Bid Opening Date:
March
3 , 2026 (2:00 PM)
NOIA Posting Date:
March
5 , 2026
Project Manager:
An
dy Wong
, P.E.
NOIA Posting Location:
Addenda & Official Notices
On
March
3 , 202
6 , the City of Milpitas (City) held a bid opening for the upcoming Sinnott Park
Playground Renovation
Project
. The City intends to award the Project contract to the lowest responsive bidder,
Star Construction
, Inc.
, at the
April
7 , 202
6 , City Council Meeting.
As per Milpitas Municipal Code (MMC)
MMC 1
-
2 -
3.19 -
Protest Procedure
, Any interested party
may file a protest to a proposed award of a contract in an amount over Ten Thousand Dollars ($10,000). The protest shall be filed with the Purchasing Agent in writing no later than seven (7) calendar days after the posting of the Not
ice of Intent to award and shall set forth the basis for the protest and any proposed remedy.
All protests shall be in writing and shall contain a complete statement of the legal grounds for the protest; all the facts relevant to the protest; and the
form of relief requested and the legal
basis for such relief. All protests shall be accompanied by all documentation supporting the grounds for the protest. The protest shall include the name, address
and
telephone
number
of
the
protesting
party
and
the
person
representing
the
protesting party, if any.
Protests may be submitted only by a party that has submitted a bid or proposal in response to the
contract
solicitation.
A
subcontractor
of
a
bidder
or
proposer
may
not
submit
a
protest.
A
party
may not rely on a protest submitted by another party but must timely pursue its own protest.
Protests can only be submitted by the party that submitted the bid by one of the following methods:
Via
or
hand
delivered, Monday thru Friday,
between
8:00
a.m.
and
5:00
p.m.
to:
Attn: Luz Cofresi
-
Howe,
Finance Director
455 E. Calaveras Blvd,
Milpitas, CA 95035
OR,
via
e
-
mail
@
LCofresi
-
[email protected]
Attachment E
Construction Change Order Policy for the Sinnott Park Playground Renovation, CIP No. 3471
2021 City Council Approved Construction Change Order Policy
Construction Award Individual Administrative Cumulative Award Amount Change Order Authority Change Order Authority Less than $100,000 $10,000 $15,000
Over $100,000 10% of Award or $20,000 15% of Award or $40,000 whichever is less whichever is smaller
Sinnott Park Playground Renovation, CIP No. 3471 Change Order Policy
Construction Award Individual Administrative Cumulative Award Amount Change Order Authority Change Order Authority $1,208,000 N/A $182,000
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Authorize the City Manager, or Designee, to Negotiate and Execute an Agreement with Environmental Innovations, Inc. for Stormwater Inspection Services (Staff Contact: Luz Cofresí-Howe, Finance Director, 408-586-3111; and Christian Di Renzo, Public Works Director, 408-586-2602) Category: Consent Calendar-Community Services and Sustainable Infrastructure Meeting Date: 4/7/2026
Recommendation: Authorize the City Manager, or designee, to negotiate and execute a Professional Services Agreement with Environmental Innovations, Inc., for Stormwater Inspection Services for a five-year term and a total amount not-to-exceed of $376,180, subject to the appropriation of funds.
BACKGROUND:
The City is required to conduct stormwater inspections at commercial and industrial facilities as part of the Industrial and Commercial Site Controls Program as outlined in provision C.4. of the Municipal Regional Stormwater Permit (MRP), Order No. R2-2022-0018 NPDES, Permit No. CAS612008 issued by the San Francisco Bay Regional Water Quality Control Board on May 11, 2022. The Permit governs stormwater discharges from 76 municipal jurisdictions and focuses on trash reduction, green infrastructure, and controlling pollutants from entering local waterways and the San Francisco Bay. Provision C.4. of the Permit mandates rigorous industrial and commercial site controls to minimize and prevent stormwater pollutants, including inspections at high-priority sites such as industrial and commercial facilities, to verify compliance with stormwater pollution prevention requirements. To comply with the Order, the City conducts over 300 inspections per fiscal year.
ANALYSIS:
On December 19, 2025, the City released a Request for Proposal (RFP 25-1182) for Stormwater Inspection Services at Commercial and Industrial Facilities.
The RFP was publicly noticed on City’s website and OpenGov, the City’s e-procurement website, in accordance with City Municipal Code. Upon release, 6,956 companies were notified of the RFP, and 63 companies downloaded the RFP documents. Two vendors submitted a bid response by the published closing date of January 28, 2026.
The RFP was evaluated and scored according to the criteria specified in the solicitation. Final evaluation scores for the two proposers were as follows:
Evaluation Criteria
Evaluation Criteria
Weight (%)
Environmental
Innovations, Inc.
Aurora Environmental
Services, Inc.
Cover Letter and RFP Requirements 5% 5 5
Company Profile 10% 10 9
Execution Plan 25% 24 23
Personnel Assigned 15% 12 14
Technical Proposal 20% 20 19
Proposed Compensation 20% 20 14
References 5% 5 4
Total 100.00% 96 88
POLICY ALTERNATIVE(S):
Alternative 1: Do not approve and award the agreement to Environmental Innovations, Inc.
Pros: The City would not incur these expenses.
Cons: Not awarding the contract would result in increased administrative burden associated with re-issuing the solicitation, extended timeline for contractor selection, and delays in ensuring compliance.
Reason for Not Recommending: Annual stormwater inspections of commercial and industrial facilities are required under the Municipal Regional Stormwater Permit (MRP) as outlined in Provision C.4. Not awarding the contract will result in noncompliance with these mandated inspection requirements as inspections will not be completed by the inspection deadline. Conducting these inspections exceeds existing staff capacity and creates a resource gap due to in-house personnel current workload constraints. These contracted services are required to ensure the City meets its compliance requirements for provision C.4. of the MRP.
FISCAL IMPACT:
Funding for the annual C.4. Stormwater Inspection Services is part of the base Public Works Operating Budget in the Department of Public Works. As such, there is no fiscal impact associated with this proposal.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
The project is an action taken by the City to enforce permits for use issued, adopted, or prescribed by the City or enforcement of a law, general rule, standard, or objective, administered, or adopted by the City and is exempt from CEQA pursuant to Cal. Code Regs., tit. 14, § 15321. The action has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment and is not a project pursuant to Pub. Resources Code, § 21065 and Cal. Code Regs., tit. 14, § 15378. Even if a project, the action is exempt from further CEQA review pursuant to Cal. Code Regs., tit. 14, § 15061(b)(3) as it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.
ATTACHMENT(S):
None
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Approve and Authorize the City Manager, or Designee, to Execute Agreements with Quality Assurance Engineering, Inc. and Achievement Engineering Corp., for On-Call Inspection Services (Staff Contact: Christian Di Renzo, Public Works Director, 408-586-2602; and Michael Silveira, City Engineer, 408-586- 3303)
Category: Consent Calendar-Community Development
Meeting Date: 4/7/2026
Recommendation: Approve and authorize the City Manager, or designee, to execute Professional Service Agreements with Quality Assurance Engineering, Inc., in an amount not to exceed $700,000 and Achievement Engineering Corp. in an amount not to exceed $300,000 for on-call inspection services for a five-year term.
BACKGROUND:
The inspection division of the Public Works Department manages the inspection of public improvements within the City right-of-way for private development and encroachment permits, and capital improvement projects.
Inspectors’ primary focus is to ensure the construction of new public improvements are in accordance with approved plans and specifications, permit requirements, and City guidelines and standards. Special inspections and material testing (Services) are generally required to ensure that construction materials and workmanship complies with project requirements thereby protecting the City and public from deficient material and workmanship, ensuring structural integrity, and providing independent quality assurance for critical activities of construction such as, but not limited to, asphalt pavement placement, building/structure related construction, concrete forming and placement, compaction of soil and material of utility trenches, utility installation, welding, etc. Since these Services require specialized equipment and certificated laboratories and technicians for testing, the City is not equipped to perform these functions and must retain qualified firm(s).
As part of the On-Call Inspection Services Professional Service Agreement (Agreement), the qualified firm will also provide staff augmentation to meet the fluctuating inspection demands associated with both private development and capital improvement projects which typically vary throughout the year and intensify during peak construction period from March to October. Staff augmentation is typically required for, but not limited to, the City’s annual street resurfacing project that requires extended inspection support, night and weekend work for PG&E and water main shutdowns, and cover for anticipated and unanticipated leave by staff during any given time.
This type of Agreement has been in place in the City since 2000 and has proven to be very effective in supporting the workload of the Inspection Division of the Public Works Department to ensure new infrastructure is constructed according to approved plans and specifications and City guidelines and standards. The current five-year Agreement, which will expire this year, was budgeted at $1 million, of which approximately $600,000 has been expended, for an average of approximately $120,000 per year.
On August 12, 2025, staff held a Meet and Confer meeting with the LiUNA representative and ProTech union to discuss the solicitation. On August 20, 2025, LiUNA representative confirmed the ProTech union did not object to the Department’s request to obtain a qualified firm(s) to provide services for special inspection, material testing, and staff augmentation.
ANALYSIS:
In accordance with City Municipal Code Section I-2-3.10 - Request for Qualification (RFQa) Procedure, an RFQa was posted on the City’s eProcurement system, OpenGov Procurement on September 8, 2025, to seek a qualified firm with expertise in providing special inspection, material testing, and staff augmentation to support the Inspection Division of the Public Works Department. The scope of work is more detailed in Exhibit A of the Agreement (Attachments A & B).
Upon release, seventy-six (76) firms downloaded the RFQa document, and thirteen (13) firms submitted proposals by the published closing date of October 10, 2025. Each proposal was evaluated and scored according to the criteria outlined in the solicitation. The following table summarizes the rating of each proposer.
Vendor Cover
Letter
Company
Profile
Execution
Plan
Personnel
Assigned References Fee
Schedule
Total
Score
5% 30% 30% 20% 5% 10% Weighted
Average
Quality Assurance
Engineering (dba
Consolidated
Engineering
Laboratories)
9.33 9 8.67 9 8.67 9.33 89.33 Qualified
Achievement
Engineering Corp 9.33 8.33 8 8 8.33 8.67 82.5 Qualified Signet Testing
Laboratories 9 8 7.33 7.67 8.67 8.33 78.5 Qualified
Ninyo & Moore 8.33 7.67 7.67 7.67 8 7.33 76.83 Qualified BSK Associates 9 7.67 7.67 7.33 7.67 7.67 76.67 Qualified Twining 8.67 7.67 7.33 7 8 8.33 75.67 Qualified
Smith-Emery
Laboratories 8 7 7.67 7.33 7.67 8 74.5 Qualified
CSG Consultants, 9.33 7.33 7.33 6.67 7.67 8 73.83 Qualified Zoon Engineering 8.33 6.67 7.33 6.67 8 6.67 70.17 Qualified ISI Inspection
Services 9 7 6.33 6.33 7.33 8.33 69.17 Qualified
Pavement
Engineering 8 7 6 6.33 7.33 8 67.33 Qualified
Aftershock
Geotechnical 6 4.33 4.67 5.67 6.33 6 50.5 Not
Qualified
Coil Digital
Consulting 4.33 3.33 2.67 3 3 3 30.67 Not
Qualified
In accordance with City Municipal Code Section I-2-3.13 – Contracting for Consultants, staff recommends that the City Council authorize the City Manager, or designee, to execute a Professional Service Agreement with Quality Assurance Engineering, Inc., (dba Consolidated Engineering Laboratories [CEL]) in the amount not-to- exceed of $700,000 and Achievement Engineering Corp. (AEC) in the amount not-to-exceed $300,000 for a five-year term to provide special inspection, material testing, and staff augmentation services.
The selected firms will be utilized on an as-needed basis and staff will provide a work order based on the scope of work and their availability. Award of these Agreements does not guarantee work, but the selected firm will remain available to perform services upon request for an authorized amount during the term of the Agreement. Having multiple Agreements in place will provide staff the flexibility in selecting a firm for a specific project or work order.
POLICY ALTERNATIVE(S):
Alternative 1: Not approving the Agreements with CEL and AEC.
Pros: None
Cons: Special inspections and materials testing services are required to ensure City infrastructure is constructed in compliance with approved plans and specifications, permit requirements, and City guidelines and standards. Since these Services cannot be performed in-house, the City will not be able to obtain the necessary special inspections and testing services to support construction quality assurance, regulatory compliance, and public safety. In addition, not having the service for staff augmentation (should it be required) could delay project schedules, increase risks of construction deficiencies, and lead to potential costly remediation work.
Reason for Not Recommending: The City would be unable to secure special inspections and material testing services and appropriate staffing for ongoing and upcoming critical capital projects, including the Calaveras Blvd. Median Beautification, McCandless Well, McCandless Pedestrian Bridge, Metro Tango Park, MSC Bleacher Replacement Project, Sinnott Park Playground Renovation, South Milpitas Boulevard Extension, Street Resurfacing project for Dempsey Road, Great Mall Parkway and Yellowstone Ave. and Technology Drive road improvements which could negatively impact construction progress and delivery timelines.
FISCAL IMPACT:
The Services will be performed on a work order basis and funded by either individual Capital Improvement Program (CIP) projects or reimbursed by developers of private development projects. The service is budgeted for each CIP project. Approval of these Agreements does not require any additional budget appropriation and will have no effect on the General Fund.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
The project is an action taken by the City to enforce permits for use issued, adopted, or prescribed by the City or enforcement of a law, general rule, standard, or objective, administered, or adopted by the City and is exempt from CEQA pursuant to Cal. Code Regs., tit. 14, § 15321. The action has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment and is not a project pursuant to Pub. Resources Code, § 21065 and Cal. Code Regs., tit. 14, § 15378. Even if a project, the action is exempt from further CEQA review pursuant to Cal. Code Regs., tit. 14, § 15061(b)(3) as it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.
ATTACHMENT:
(a) Professional Service Agreement with Quality Assurance Engineering (dba Consolidated Engineering Laboratories)
(b) Professional Service Agreement with Achievement Engineering Corp
38077.00180\29167975.12 C2
1 CITY OF MILPITAS
PROFESSIONAL SERVICES AGREEMENT
This Agreement is made and entered into as of ________________, (“Effective Date”) by and between the City of Milpitas, a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 455 E. Calaveras Boulevard, Milpitas, California 95035 (“City”), and Quality Assurance Engineering, Inc., a California Corporation DBA “Consolidated Engineering Laboratories” with its principal place of business at 2001 Crow Canyon Road, Suite 100 San Ramon, CA 94583 (hereinafter referred to as “Consultant”). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.
RECITALS
A. City is a public agency of the State of California and is in need of professional services for the following project:
Materials Testing and Inspection Services for the Department of Public Works (hereinafter referred to as “the Project”).
B. Consultant is duly licensed and has the necessary qualifications to provide such services.
C. The Parties desire by this Agreement to establish the terms for City to retain Consultant to provide the services described herein.
AGREEMENT
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:
1. Services.
Consultant shall provide the City with the services described in the Scope of Services attached hereto as Exhibit A.
2. Compensation.
a. Subject to paragraph 2(b) below, the City shall pay for such services in accordance with the Schedule of Charges set forth in Exhibit B.
b. In no event shall the total amount paid for services rendered by Consultant under this Agreement exceed the sum of Seven Hundred Thousand Dollars and Zero Cents ($700,000.00). This amount is to cover all travel time, mileage, meals, and related costs, and the City will not pay any additional fees for these expenses. Periodic payments shall be made within thirty (30) days of receipt of an invoice which includes a detailed description of the work performed. Payments to Consultant for work performed will be made on a monthly billing basis.
3. Additional Work.
If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by
38077.00180\29167975.12 C2
2 both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.
4. Maintenance of Records.
Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available at all reasonable times during the Agreement term and for four (4) years from the date of final payment under the Agreement for inspection by City.
5. Term
The term of this Agreement shall be from May 1, 2026 to April 30, 2031, unless earlier terminated as provided herein. The City reserves the right to review the Consultant’s performance at the end of each year and cancel all or part of the Agreement.
6. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non-performing party. For purposes of this Agreement, such circumstances include but are not limited to, abnormal weather conditions; floods; earthquakes; fire; epidemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint. b. Should such circumstances occur, the non-performing party shall, within a reasonable time of being prevented from performing, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement.
7. Compliance with Law.
a. Consultant shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local government, including Cal/OSHA requirements. b. If required, Consultant shall assist the City, as requested, in obtaining and maintaining all permits required of Consultant by federal, state and local regulatory agencies. c. If applicable, Consultant is responsible for all costs of clean up and/ or removal of hazardous and toxic substances spilled as a result of his or her services or operations performed under this Agreement.
8. Standard of Care
Consultant’s services will be performed in accordance with generally accepted professional practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions.
9. Assignment and Subconsultant
Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason. Any attempt to
38077.00180\29167975.12 C2
3 so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. Nothing contained herein shall prevent Consultant from employing independent associates, and subconsultants as Consultant may deem appropriate to assist in the performance of services hereunder.
10. Independent Consultant
Consultant is retained as an independent contractor and is not an employee of City. No employee or agent of Consultant shall become an employee of City. The work to be performed shall be in accordance with the work described in this Agreement, subject to such directions and amendments from City as herein provided.
11. Insurance. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City it has secured all insurance required under Exhibit D (Insurance Requirements), attached hereto and incorporated herein by this reference. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required therein.
12. Indemnification .
a. To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
b. If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.
13. California Labor Code Requirements.
a. Consultant is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects (“Prevailing Wage Laws”). If the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is One Thousand Dollars and Zero Cents ($1,000.00) or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code
38077.00180\29167975.12 C2
4 Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
b. If the services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such services must be registered with the Department of Industrial Relations.
Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
c. This Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor.
14. Verification of Employment Eligibility.
By executing this Agreement, Consultant verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.
15. Laws and Venue.
This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the County of Santa Clara, State of California.
16. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giving ten (10) calendar days written notice to Consultant. In such event, City shall be immediately given title and possession to all original field notes, drawings and specifications, written reports and other documents produced or developed for that portion of the work completed and/or being abandoned. City shall pay Consultant the reasonable value of services rendered for any portion of the work completed prior to termination. If said termination occurs prior to completion of any task for the Project for which a payment request has not been received, the charge for services performed during such task shall be the reasonable value of such services, based on an amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Consultant shall not be entitled
38077.00180\29167975.12 C2
5 to payment for unperformed services, and shall not be entitled to damages or compensation for termination of work.
b. Consultant may terminate its obligation to provide further services under this Agreement upon thirty (30) calendar days’ written notice to City only in the event of substantial failure by City to perform in accordance with the terms of this Agreement through no fault of Consultant. c. The Consultant understands and accepts that at all times; the Agreement is subject to appropriation of funds by the Milpitas City Council. The Agreement may terminate without penalty, liability or expense of any kind to the City at the end of Agreement term. The City has no obligation to make appropriations for the Agreement in lieu of appropriations for new or other contracts. City budget decisions are subject to the discretion of the Mayor and City Council. Consultant’s assumption of risk of possible non-appropriation is a part of the consideration for the Agreement. This section controls against any and all other provisions of the Agreement.
17. Documents. Except as otherwise provided in “Termination or Abandonment,” above, all original field notes, written reports, Drawings and Specifications and other documents, produced or developed for the Project shall, upon payment in full for the services described in this Agreement, be furnished to and become the property of the City.
18. Organization
Consultant shall assign Martin Meier as Project Manager. The Project Manager shall not be removed from the Project or reassigned without the prior written consent of the City.
19. Limitation of Agreement.
This Agreement is limited to and includes only the work included in the Project described above.
20. Notice
Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to:
CITY:
City of Milpitas
455 E. Calaveras Boulevard
Milpitas, California 95035
Attn: Michael Silveira, City Engineer
CONSULTANT:
Consolidated Engineering Laboratories
2001 Crow Canyon Road, Suite 100
San Ramon, CA 94583
Attn: Martin Meier, Senior Project Manager
and shall be effective upon receipt thereof.
22. Third Party Rights
Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.
38077.00180\29167975.12 C2
6 23. Equal Opportunity Employment.
Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.
24. Entire Agreement
This Agreement, with its exhibits, represents the entire understanding of City and Consultant as to those matters contained herein, and supersedes and cancels any prior or contemporaneous oral or written understanding, promises or representations with respect to those matters covered hereunder. Each party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This Agreement may not be modified or altered except in writing signed by both Parties hereto. This is an integrated Agreement.
25. Severability
The unenforceability, invalidity or illegality of any provision(s) of this Agreement shall not render the provisions unenforceable, invalid or illegal.
26. Successors and Assigns
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.
27. Non-Waiver
None of the provisions of this Agreement shall be considered waived by either party, unless such waiver is specifically specified in writing.
28. Time of Essence
Time is of the essence for each and every provision of this Agreement.
29. City’s Right to Employ Other Consultants
City reserves its right to employ other consultants, including engineers, in connection with this Project or other projects.
30. Prohibited Interests
Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service
38077.00180\29167975.12 C2
7 with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
31. Wage Theft Prevention
a. Consultant, and any subconsultant it employs to complete work under this Agreement, shall comply with all applicable federal, state and local wage and hour laws. Applicable laws may include, but are not limited to, the Federal Fair Labor Standards Act, the California Labor Code and the Milpitas Minimum Wage Ordinance.
b. BY SIGNING THIS AGREEMENT, CONSULTANT AFFIRMS THAT IT HAS
DISCLOSED ANY FINAL JUDGMENTS, DECISIONS OR ORDERS FROM A COURT OR INVESTIGATORY GOVERNMENT AGENCY, FINDING IN THE FIVE (5) YEARS PRIOR TO
EXECUTING THIS AGREEMENT THAT CONSULTANT OR ITS SUBCONSULTANTS HAS VIOLATED ANY APPLICABLE WAGE AND HOUR LAWS. CONSULTANT FURTHER AFFIRMS
THAT IT OR ITS SUBCONSULTANT(S) HAS EITHER FULLY SATISFIED EACH JUDGMENT,
DECISION OR ORDER, OR, IF ANY JUDGMENT, DECISION OR ORDER HAS NOT BEEN FULLY
SATISFIED, CONSULTANT AFFIRMS THAT IT OR ITS SUBCONSULTANT(S) IS CURRENTLY
SATISFYING SAID JUDGMENT, DECISION OR ORDER THROUGH A PAYMENT OR
ALTERNATIVE PLAN APPROVED BY THE APPLICABLE COURT/GOVERNMENT AGENCY
AND THAT CONSULTANT OR ITS SUBCONSULTANT(S) ARE IN COMPLIANCE WITH SAID PLAN AS OF THE DATE OF EXECUTING THIS AGREEMENT.
c. If at any time during the term of this Agreement, a court or investigatory government agency issues a final judgment, decision or order finding that Consultant or a subconsultant it employs to perform work under this Agreement has violated any applicable wage and hour law, or Consultant learns of such a judgment, decision, or order that was not previously disclosed in its bid/proposal, Consultant shall inform the City no more than fifteen (15) calendar days after the judgment, decision or order becomes final or from the date of learning of the final judgment, decision or order.
Consultant or its subconsultant(s) shall, within thirty (30) calendar days after notifying the City, either (i) fully satisfy any such judgment, decision, or order and provide the City with documentary evidence of satisfying said judgment, decision or order; or (ii) provide the City documentary evidence of a payment or other alternative plan approved by the court/government agency to satisfy the judgment, decision or order.
If the Consultant or its subconsultant is subject to a payment or other alternative plan, the Consultant or its subconsultant shall continue to submit documentary evidence every thirty (30) calendar days during the term of the Agreement demonstrating continued compliance with the plan until the judgment, decision or order has been fully satisfied.
d. For purposes of this Section, a "final judgment, decision, or order" refers to one for which all appeals have been exhausted or the time period to appeal has expired. Relevant investigatory government agencies include: the United States Department of Labor, the California Division of Labor Standards Enforcement, the City, or any other governmental entity or division tasked with the investigation and enforcement of wage and hour laws.
e. Failure to comply with any part of this Section constitutes a material breach of this Agreement. Such breach may serve as a basis for immediate termination of this Agreement and/or any other remedies available under this Agreement and/or law.
f. Notice provided to the City shall be addressed to: Attention: Finance Director, 455 E. Calaveras Blvd. Milpitas, CA 95035. The Notice provisions of this Section are separate from any other
38077.00180\29167975.12 C2
8 notice provisions in this Agreement and, accordingly, only notice provided to the above address satisfies the notice requirements in this Section.
[SIGNATURES ON FOLLOWING PAGE]
38077.00180\29167975.12 C2
9 SIGNATURE PAGE FOR PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF MILPITAS
AND QUALITY ASSURANCE ENGINEERING, INC. DBA “CONSOLIDATED ENGINEERING LABORATORIES”
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.
CITY OF MILPITAS
Approved By:
Matt Cano
Acting City Manager
Date
Approved As To Form:
Christopher Creech
Assistant City Attorney
Approved:
Luz Cofresí-Howe
Finance Director/Risk Manager
Approved As To Content:
Christian Di Renzo
Public Works Director
CONSOLIDATED ENGINEERING
LABORATORIES, INC.
Signature
Rob Morse
Name
President _____________
Title
Date
38077.00180\29167975.12 C2
10 EXHIBIT A
Scope of Services
Consultant shall provide on-call construction inspection, material testing, and staff augmentation services for various projects, including Capital Improvement Projects (CIP) and private development projects within the City. Consultants’ services shall be provided as requested by the City on an as needed basis.
1. GENERAL PROVISIONS
A. Consultant shall perform all services to the satisfaction of the City.
B. All the services furnished by the Consultant under this Scope of Work shall be in accordance with the professional standards and quality which prevail among inspection and materials testing professionals, of similar knowledge and skill engaged in related work throughout California, under the same or similar circumstances. All documentation prepared by Consultant shall provide for a completed project that confirms to all applicable codes, rules, regulations and guidelines which are in effect at the time such a documentation is prepared.
C. All work performed shall be authorized by a project specific Service Order. Each Service Order given by City shall detail the nature of the specific services to be performed by the Consultant, the time limit within which such services must be completed and the compensation for such services. Such details shall include a description of the project for which Consultant s hall perform the services, the location of the project, the type and scope of services to be performed, the format and schedule for deliverables, the schedule of performance, and the schedule of compensation. Consultant shall not perform any services unless authorized by a fully executed Service Order. Any unauthorized services performed by Consultant shall be at no cost to the City.
D. Consultant shall begin work under the service order only after receipt of a fully executed Service Order. Each authorized Service Order issued under this agreement shall be incorporated into the terms and conditions of this agreement.
E. City will assign a Project Manager to facilitate each Service Order authorized. Consultant shall coordinate with the designated Project Manager and/or the Senior Public Works Inspector on the performance of each Service Order.
F. In collaboration with the City Project Manager, consultant shall be responsible for coordinating with all City, Federal, State and local agencies to ensure that all necessary steps are followed to complete the required testing and inspections.
F. Assignment of Personnel. Consultant shall assign only competent personnel to perform services for the City. The Service Order may name any specific personnel who shall be performing services. In the event that City, in its sole discretion, desires the reassignment of any such persons, Consultant shall immediately, upon receiving notice from the City, reassign such person or persons.
2. BASIC SERVICES
A. Consultant shall provide construction inspection and materials testing, and staff augmentation services for various City Capital Improvement Projects and private development projects, as more particularly described in the authorized Project Service Order. The authorized Service Order may include any of the specific construction inspection and materials testing tasks set forth below in Section 3. The authorized Service Order may also include any other related inspection and testing services described and agreed to be performed by the Consultant.
B. Service Initiation
Prepare Service Order – The Consultant shall familiarize themselves with the Project, its scope, and its goals, and, in collaboration with the City’s Project Manager, discuss and develop a proposed scope of services.
The scope of work for Project services shall be consistent with City’s standard form of Service Order. The proposed scope of services shall, at a minimum, include the following: Project Description, Scope of Services including deliverables, and project schedule, and estimated compensation. Consultant shall submit the proposed scope of services to the Project Manager in electronic format.
The City’s Project Manager will review and comment on proposed scope of work, and the parties shall agree on the terms of the final Service Order. Consultant shall not be compensated for work performed in preparing a draft scope of services for a Service Order.
C. Service Implementation
Upon receipt of an authorized Service Order, Consultant shall begin Project services described in the Service Order. For each Project, in addition to the specified services, products and deliverables detailed in the Service Order, Consultant shall perform the following tasks as required:
Project Kick-off Meeting: Prior to the beginning substantive work on a project, Consultant and City shall discuss procedures and notifications for any necessary meeting and communications with City staff; collect available data from the City and establish additional data needs and availability; confirm the format for all project products and deliverables; and address any preliminary project concerns.
Project Coordination Meetings: Consultant shall attend project coordination meeting as required, to perform authorized services and as required by Project Manager.
Project Schedule: Consultant shall prepare and submit a detailed schedule of performance consistent with the schedule contained in the Service Order to the City Project Manager for review and approval. Consultant shall confirm or update
the schedule monthly at a minimum. Any changes to the schedule shall only be permitted with the written approval of City’s Project Manager.
Project Progress Report: Consultant shall submit a monthly report to the Project Manager detailing progress on the Project services.
Project Record: Consultant shall develop and maintain a detailed record of the chronology of the project tasks and milestones completed that are decisive, conclusive or relevant to the outcome of the Project. Consultant shall submit a copy of the Project Record to the Project Manager prior to final payment for services perform on the Project. The Record shall be submitted in electronic format.
Project Documents: Aside from deliverables specified in the Service Order, and before the conclusion of the Project and final payment for services performed on the Project, Consultant shall submit to the Project Manager a copy of all project documents that are decisive, conclusive or relevant to the outcome of the Project.
Such documents may include, without limitation, topographical surveys and mapping, utility mapping, site inventories, base plans, reports and studies, permit applications and permits, environmental documentation, record of meetings, and communication documents. Documents shall be submitted in both paper and electronic format, as available.
3. SPECIFIC CONSTRUCTION INSPECTION & MATERIAL TESTING
SERVICES
A. In addition to any other inspection and testing services contained in the authorized Service Order, the Service Order may incorporate any of the services set forth below in this Section 3 by simply identifying the particular Task, in which case the Task is considered to have been incorporated into the authorized Service Order and Consultant shall perform the Task as set forth herein.
B. Tasks: Listed below are the Tasks which may be included in the Service Order depending on the scope of the project.
Task 1: Review the project scope.
Task 2: Visit the project site, as necessary.
Task 3: Determine the type of inspection/testing/evaluation needed, as discussed with City staff. Prepare a work plan.
Task 4: Perform inspection, sampling and testing. Services shall be performed within 24 hours of notice by the City of required.
o Task 5a: Fill Material Testing
Consultant shall perform these soils compaction tests identified in the Contract Documents, or, if no such tests are identified, those tests needed to determine whether the soil is compacted in conformance with the Standards and Requirements contained in the Contract Documents, such as ASTM D1557 or D2922 and D3017-78 and California Test 216 and 231.
Within one working day of completing each compaction test, Consultant shall provide the City with a written notice describing the test performed and the result of the test, and indicating whether or not compliance with the Standards and Requirements contained in the Contract Documents was achieved. If compliance was not achieved, the written notice should include what corrective action is needed to obtain compliance.
If corrective action is needed, the Consultant shall re-perform the compaction test within one working day of being notified by the City or Project contractor that the necessary corrective action was completed. Within one working day of completing a re-test, Consultant shall provide the City with written notices consistent with the requirements of above.
o Task 5b: Asphalt Testing
Consultant shall perform those asphalt compaction tests identified in the Contract Documents, or, if no such tests are identified, those tests needed to determine whether the asphalt is compacted in conformance with the Standards and Requirements as required in the Contract Documents such as, California Test 375 and 304. In addition, Consultant shall provide full time inspection of asphalt placement, as required, to ensure asphalt is placed in accordance with Caltrans Section 39.
Within one working day of completing each compaction test, Consultant shall provide the City with a written notice describing the test performed and the results of the test and indicating whether compliance with the Standards and Requirements contained in the Contract Documents was achieved. If compliance was not achieved, the written notice should include what corrective action is needed to obtain compliance.
If corrective action is needed, the Consultant shall re-perform the compaction test within one working day of being notified by the City of Project contractor that the necessary corrective action was completed. Within one working day of completing a re-test, Consultant shall provide the City with written notices consistent with the requirements of above.
o Task 5c: Structural Steel and Metals Testing and Inspections
Consultant shall inspect and certify the welding operations at the Project construction site and at the metal fabrication shop as needed to meet the Standards and Requirements contained in the Contract Documents. These services include verifying that the welder certifications, material preparation, welding procedures, structural steel mill certificates and material identifications comply with the Standards and Requirements contained in the Contract Documents. They also include Consultant testing welds in accordance with ASTM standards and pre the Standards and Requirements contained in the Contract Documents. In addition, Consultant shall provide full-time inspection for all structural welds as provided for in the Standards and Requirements contained in the Contract Documents as requiring full- time inspection.
Consultant shall perform special inspection and certification of, but not limited to, welding of bolts, embeds and reinforcing steel, structural steel, anchor / expansion bolts, post-tensioning tendon, steel studs, reinforcing steel stands and rebar, mechanical connectors (splices), and high strength bolting.
o Task 5d: Structural Concrete Testing and Inspection
Consultant shall perform those structural concrete tests and inspections identified in the Contract Documents, or, if no such tests and inspections are identified, those tests and inspections needed to determine if the concrete conforms to the Standards and Requirements contained in the Contract Documents such as ACI 318 and CBC Section 1903 and 1905, and ASTM C31 and C143.
Within one working day of completing each inspection and/or test, Consultant shall provide the City with a written notice describing the inspection and/or test performed and the results, and indicating whether or not compliance with the Standards and Requirements contained in the Contract Documents was achieved. If compliance was not achieved, the written notice must state what corrective action is needed to obtain compliance. If corrective action is needed, the Consultant shall re-perform the inspection and/or test within one working day of being notified by the City or Project contractor.
Task 6: Prepare a report of the inspection and/or testing results and conclusions/recommendations. Upon receipt of the analytical results, Consultant shall prepare a summary letter comparing the analytical data to the governing allowable limits. The Summary Report will include copies of the laboratory reports and a sample location map. The Summary Report will provide conclusions and recommendations. Summary report shall be provided to City staff within in one week of receipt of the analytical results.
Task 7: Assist City in obtaining approvals and/or permits from County, State, and
Federal agencies as required.
4. SPECIFIC INSPECTION STAFF AUGMENTATION SERVICES
Upon request, Consultant shall provide experienced and professional construction inspectors to assist the City’s Public Works Department with inspections. These inspectors would be assigned a variety of construction projects to oversee including City Capital Improvement, Land Development (private), and encroachment permit work. Construction work could include streets, sidewalks, curbs/gutters, streetlights, traffic signals, landscape & irrigation, water, sewer, storm and recycled water. The assigned inspectors would assist the Design & Construction Section and report to the City’s Senior Construction Inspector and the Public Works Division Manager – Engineering.
The augmentation inspection staff should have the following experience and abilities:
Duties may include, but are not limited to:
Sample construction materials for examination & analysis by laboratories. Perform routine field tests and inspections including but not limited to density testing of soils, aggregates and asphalt, concrete, and reinforcing steel. Observe work during construction and upon completion. Review quantities of materials and work performed; review and perform necessary reports for progress payments.
Indicate location of various appurtenances found during construction on plans. Prepare daily construction inspection reports, and activity records as required. Coordinate Contractor requested design alterations between City staff. Review construction plans, specifications, and shop drawings for projects assigned. Attend pre-construction meetings.
Ensure work performed by contractors and materials onsite are in compliance with the approved plans, specifications, codes and ordinances.
Check lines, grade, size, elevation and location of structures for conformance with specifications and regulations.
Inspection experience should include two or more years in the following:
Knowledge of the materials used in the construction of water, sewer and storm systems, roadways, sidewalks, gutters, and other public works infrastructure. Experience in the construction of water, sewer and storm systems, roadways, sidewalks, gutters and other public works infrastructure. Ability to read and interpret plans, specifications, shop drawings and generate “As- built” documents.
38077.00180\29167975.12 C2
11 EXHIBIT B
Schedule of Charges/Payments
Consultant will invoice City on a monthly cycle. Consultant will include with each invoice a detailed progress report that indicates the amount of budget spent on each task. Consultant will inform City regarding any out-of-scope work being performed by Consultant. This is a time-and-materials Agreement.
City of Milpitas | On-Call Construction Inspection, Material Testing, and Staff Augmentation Services
6. Proposed Compensation
CITY OF MILPITAS FEE SCHEDULE
ON-CALL MATERIALS TESTING AND INSPECTION SERVICES
Effective January 1, 2026 through December 31, 2031
ENGINEERING SERVICES UNIT RATE UNIT
Principal/Principal Engineer $195.00 hour
Geotechnical Engineer $195.00 hour
Senior Engineer $190.00 hour
Project Engineer/Geologist $175.00 hour
Staff Engineer $160.00 hour
Assistant Engineer $140.00 hour
Field Supervisor $130.00 hour
INSPECTION SERVICES UNIT RATE UNIT
ICC/AWS Inspector with NDT Equipment $119.00 hour
ICC/AWS Inspector (Visual Only) $114.00 hour
ICC Certified Inspector $109.00 hour
Proofload Testing/Anchor Installation Inspector $109.00 hour Mechanical Inspector $135.00 hour
Electrical Inspector $250.00 hour
Plumbing Inspector $135.00 hour
OSHPD IFC Premier Certified Firestop Inspector $125.00 hour General Construction Inspector $125.00 hour
Waterproofing Technician $125.00 hour
Soils Inspector with Nuclear Gauge (Portal-to-Portal
Charges Apply) $114.00 hour
SPECIALIZED SERVICES UNIT RATE UNIT
Pachometer $115.00 hour
In-Place Brick Shear Tests (Masonry) - Two-Person
Crew (4-hour minimum) $235.00 hour
Ground Penetrating Radar (GPR)
- One Man Crew $260.00 hour
- Two Man Crew $375.00 hour
Floor Flatness Testing:
- Surveying/Inspection $210.00 hour
Phased Array Technician $165.00 hour
Profileograph Technician $175.00 hour
Profileograph Equipment Quotation on Request
CORING SERVICES UNIT RATE UNIT
Coring Machine Operator $235.00 hour
Helper (add per hour) $100.00 hour
Diamond Drill Bit Charges, per inch to 5” $10.00 inch
Diamond Drill Bit Charges, per inch 6” and over Quotation on Request CONCRETE UNIT RATE* UNIT
Concrete Mix Design Review $325.00 each
Trial Batches, Prepared in Laboratory C192 $1,500.00 each Length Change of Concrete (Shrinkage), set of 3,
ASTM C157, CT 530 $475.00 each
Compression, 6X12 Cylinders, ASTM C 39, CT 521 $50.00 each Compression 4x8 Cylinders ASTM C 39 $39.00 each
Compression, Core (including end preparation),
ASTM C 42 $105.00 each
Compression, 3X6 Cylinders Lightweight Insulating
Concrete, ASTM C 495 $65.00 each
Grout Compression, 2X2 Cubes, each age, ASTM
C 109 $75.00 each
Epoxy Grout 2x2 Cube Compression ASTM C 579 $75.00 each Cylinders, Stored 60 days (hold cylinders) $40.00 each Splitting TensileStrength, 6X12 Cylinders, ASTM C
496 $125.00 each
Unit Weight of Concrete Cylinders, ASTM C 567 $105.00 each Unit Weight of Lightweight Insulating Concrete,
ASTM C 495 $105.00 each
Compression Test of Lightweight Insulating Con-
crete, ASTM C 495 $65.00 each
Flexural Strength of Concrete, ASTM C 78 $295.00 each
Shotcrete Pre-Production Panel Evaluation, Up to
12” Thick $1,800.00 each
Shotcrete Pre-Production Panel Evaluation, 12” to
24” Thick $2,400.00 each
Shotcrete Panel Core Compression Test, ASTM C 42 $105.00 each Chloride Ion Content, AASHTO T260 $160.00 each
SOIL MECHANICS UNIT RATE* UNIT
Moisture/Density Curve
Standard Proctor ASTM D 698 $345.00 each
Modified Proctor ASTM D 1557 $345.00 each
Checkpoint (ASTM or Caltrans) $250.00 each
California Impact, CT 216 $250.00 each
Rock Correction for Oversize Material, ASTM
D4718/CT216 $125.00 each
Sieve Analysis
Bulk Sample Gradation, ASTM C 136/C117/
CT202 $195.00 each
Material Finer than #200 Sieve, ASTM C 117 $125.00 each Soil Mechanics
“R” Value, ASTM D 2844/CT 301 $395.00 each
Sand Equivalent, ASTM D 2419/CT 217 $125.00 each
Liquid Limit, Plastic Limit, & P .I. Atterberg Limits
ASTM D4318 $275.00 each
California Bearing Ratio, 1 pt. (ASTM D1883) $275.00 each California Bearing Ratio, 3 pt. (ASTM D1883) $755.00 each California Bearing Ratio, 3 pt. (ASTM D1883) w/
96 hour soak $860.00 each
Moisture-Density Sample Tubes ASTM D2937 $75.00 each
38077.00180\29167975.12 C2
12 EXHIBIT C
Service Order Form Template
19 38077.00180\29167975.8
4/8/19
SERVICE ORDER
CONSULTANT MASTER AGREEMENT
This Service Order is made and entered into by and between the CITY OF MILPITAS, a municipal corporation of the State of California and_____________. CITY a nd CONSULTANT have entered into a Master Service Agreement dated __________which authorizes the proposed services and compensation as outlined below.
SERVICE ORDER
S
e r v i c e O r d e r N o : _ _ _ _ _ _ _ D
a t e : ___________
Service Order estimated Compensation: $______________________ CONSULTANT Firm Name: _____________________________________________ Address: ________________________________________________________ Contact: _________________________________________________________ Phone/Email: _____________________________________________________
PROJECT DESCRIPTION
Project Name & Number:___________________________________________________ Brief Description of Services: _______________________________________________ Exhibit A: Include Full Scope of Services, Schedule of Performance and Compensation as required
APPROVALS
CONSULTANT: _______________________________________ Date: __________ City Project Manager: ______________________________ Date: _________ Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated, and that funds are available as of this date of signature.
PW Division Manager - Engineering Signature: ________________________________ Date: _________
CC: Sr. Public Works Inspector
38077.00180\29167975.12 C2
13 EXHIBIT D
INSURANCE REQUIREMENTS
Please refer to the insurance requirements listed below. Those that have an “X” indicated in the space before the requirement apply to Contractor’s or Consultant’s Agreement.
Contractor or Consultant shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Contractor or Consultant, its agents, representatives, employees or subcontractors.
Contractor or Consultant shall provide its insurance broker(s)/agent(s) with a copy of these requirements and request that they provide Certificates of Insurance complete with copies of all required endorsements.
Contractor or Consultant shall furnish City with copies of original endorsements affecting coverage required by this Exhibit D. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements and certificates are to be received and approved by City before work commences. City has the right to require Contractor’s or Consultant’s insurer to provide complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications.
Commercial General Liability (CGL):
___ Coverage at least as broad as Insurance Services Office (“ISO”) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury with limits no less than $2,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
_X_ Coverage at least as broad as ISO Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury with limits no less than $1,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
___ Coverage at least as broad as ISO Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury with limits no less than $5,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
Automobile Liability:
_X_ Coverage at least as broad as ISO Form Number CA 0001 covering, Code 1 (any auto), of if Contractor or Consultant has no owned autos, Code 8 (hired) and 9 (non-owned), with limits no less than $1,000,000.00 combined single limit for bodily injury and property damage.
___ Coverage at least as broad as ISO Form Number CA 0001 covering, Code 1 (any auto), with limits no less than $5,000,000.00 combined single limit for bodily injury and property damage.
38077.00180\29167975.12 C2
14 ___ Garage keepers’ extra liability endorsement to extend coverage to all vehicles in the care, custody and control of the Contractor or Consultant, regardless of where the vehicles are kept or driven.
Professional Liability (Errors and Omissions):
_X_ Insurance appropriates to the Contractor or Consultant’s profession, with limit no less than $1,000,000.00 per occurrence or claim, $2,000,000.00 aggregate.
___ (If Design/Build), with limits no less than $1,000,000.00 per occurrence or claim, and $2,000,000.00 policy aggregate.
___ Insurance appropriates to the Contractor or Consultant’s profession, with limit no less than ______ per occurrence or claim, ______ aggregate
Workers’ Compensation Insurance:
_X_ Insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000.00 per accident for bodily injury or disease. (Not required if Contractor or Consultant provides written verification it has no employees)
The Employer’s Liability policy shall be endorsed to waive any right of subrogation as respects the City, its elected and appointed officials, officers, attorneys, agents, and employees.
Builder’s Risk (Course of Construction):
___ Insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions. If the project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment.
The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site.
Contractor’s or Consultant’s Pollution Legal Liability:
___ Contractor’s or Consultant’s pollution legal liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000.00 per occurrence or claim and $2,000,000.00 policy aggregate.
If the Contractor or Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor or Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
Cyber Liability Insurance
___ Cyber Liability Insurance with limits not less than $1,000,000 per claim.
38077.00180\29167975.12 C2
15 Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Contractor or Consultant in this Agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion, and network security.
The policy shall provide coverage for breach response costs as well as regulatory fines and penalties, and credit monitoring expenses with limits sufficient to respond to these obligations.
Surety Bonds:
Contractor shall provide the following Surety Bonds:
____ Bid Bond
____ Performance Bond
____ Payment Bond
The Payment Bond and Performance Bond shall be in a sum equal to the contract price. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Other Insurance Provisions:
The insurance policies are to contain, or be endorsed to contain the following provisions:
_X_ Additional Insured Status and Primary/Non-Contributory Language:
Contractor’s general liability and automobile liability policies shall be primary and shall not seek contribution from the City’s coverage and be endorsed to add the City and its elected and appointed officials, officers, attorneys, agents employees and volunteers as additional insureds under such policies using Insurance Services Office form CG 20 10 (or equivalent) on the general liability policy. For construction projects, an endorsement providing completed operations coverage for the additional insured on the general liability policy, ISO form CG 20 37 (or equivalent), is also required.
The limits of insurance required in this Agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City (if agreed to in a written contract or agreement) before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
___ Loss Payee Status – Builder’s Risk/Course of Construction Insurance (applicable to Construction Contracts only)
Contractor or Consultant may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear.
_X_ Notice of Cancellation, Suspension or Otherwise Voiding Policies:
Each insurance policy required above shall contain or be endorsed to contain that coverage shall not be suspended, voided, canceled or reduced in coverage or in limits except with thirty (30) days’ prior written notice by certified mail, return receipt requested to the City.
38077.00180\29167975.12 C2
16 _X_ Waiver of Subrogation:
Contractor or Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Contractor or Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Contractor or Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation Policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by Contractor or Consultant, its employees, agents and subcontractors.
___ Completed Operations
For Construction Agreements, Contractor shall maintain insurance as required by this Agreement to the fullest amount allowed by law and shall maintain insurance for a minimum of five (5) years following the completion of this project. In the event Contractor fails to obtain or maintain completed operations coverage as required by this Agreement, the City at its sole discretion may purchase the coverage required and the cost will be paid by Contractor.
THE FOLLOWING PROVISIONS APPLY TO ALL AGREEMENTS
Deductibles and Self-Insured Retentions (“SIR”):
Any deductibles or self-insured retentions must be declared to and approved by City. The City may require the Contractor or Consultant to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. At the option of the City, either (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its elected and appointed officials, officers, attorneys, agents, and employees; or (2) the Contractor or Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.
All SIRs must be disclosed to Risk Management for approval and shall not reduce the limits of liability.
Policies containing any SIR provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named insured or the City.
City reserves the right to obtain a full-certified copy of any insurance policy and endorsements. Failure to exercise this right shall not constitute a waiver of right to exercise later.
Acceptability of Insurers:
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A-:VII, unless otherwise acceptable to City.
Claims Made Policies: (note - should be applicable only to professional liability, see below)
1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
38077.00180\29167975.12 C2
17 2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of contract of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Contractor or Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.
4. A copy of the claims reporting requirements must be submitted to the City for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractor’s Pollution Liability Policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability Policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Subcontractors:
Contractor or Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors.
Subcontractor agrees to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under this Agreement and any other contract documents. Subcontractor further agrees to include the same requirements and provisions of this Agreement, including the indemnity and insurance requirements, with any sub-subcontractor to the extent they apply to the scope of the sub- subcontractor’s work. A copy of the City indemnity and insurance provisions will be furnished to the subcontractor upon request.
Verification of Coverage:
Contractor or Consultant shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor or Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage or other special circumstances.
Failure to Comply:
Each insurance policy required above shall contain or be endorsed to contain that any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected and appointed officials, officers, attorneys, agents, and employees.
38077.00180\29167975.12 C2
18 Applicability of Coverage:
Each insurance policy required above shall contain or be endorsed to contain that the Contractor’s or Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
38077.00180\29167975.12 C2
1 CITY OF MILPITAS
PROFESSIONAL SERVICES AGREEMENT
This Agreement is made and entered into as of ________________, (“Effective Date”) by and between the City of Milpitas, a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 455 E. Calaveras Boulevard, Milpitas, California 95035 (“City”), and Achievement Engineering Corp., a California Corporation with its principal place of business at 1145 S. Third Street, San Jose CA 95112 (hereinafter referred to as “Consultant”). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.
RECITALS
A. City is a public agency of the State of California and is in need of professional services for the following project:
Materials Testing and Inspection Services for the Department of Public Works (hereinafter referred to as “the Project”).
B. Consultant is duly licensed and has the necessary qualifications to provide such services.
C. The Parties desire by this Agreement to establish the terms for City to retain Consultant to provide the services described herein.
AGREEMENT
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:
1. Services.
Consultant shall provide the City with the services described in the Scope of Services attached hereto as Exhibit A.
2. Compensation.
a. Subject to paragraph 2(b) below, the City shall pay for such services in accordance with the Schedule of Charges set forth in Exhibit B.
b. In no event shall the total amount paid for services rendered by Consultant under this Agreement exceed the sum of three hundred thousand dollars and zero cents ($300,000.00). This amount is to cover all travel time, mileage, meals, and related costs, and the City will not pay any additional fees for these expenses. Periodic payments shall be made within thirty (30) days of receipt of an invoice which includes a detailed description of the work performed. Payments to Consultant for work performed will be made on a monthly billing basis.
3. Additional Work.
If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in
38077.00180\29167975.12 C2
2 the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.
4. Maintenance of Records.
Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available at all reasonable times during the Agreement term and for four (4) years from the date of final payment under the Agreement for inspection by City.
5. Term
The term of this Agreement shall be from May 1, 2026 to April 30, 2031, unless earlier terminated as provided herein. The City reserves the right to review the Consultant’s performance at the end of each year and cancel all or part of the Agreement.
6. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non-performing party. For purposes of this Agreement, such circumstances include but are not limited to, abnormal weather conditions; floods; earthquakes; fire; epidemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint. b. Should such circumstances occur, the non-performing party shall, within a reasonable time of being prevented from performing, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement.
7. Compliance with Law.
a. Consultant shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local government, including Cal/OSHA requirements. b. If required, Consultant shall assist the City, as requested, in obtaining and maintaining all permits required of Consultant by federal, state and local regulatory agencies. c. If applicable, Consultant is responsible for all costs of clean up and/ or removal of hazardous and toxic substances spilled as a result of his or her services or operations performed under this Agreement.
8. Standard of Care
Consultant’s services will be performed in accordance with generally accepted professional practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions.
9. Assignment and Subconsultant
Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute
38077.00180\29167975.12 C2
3 grounds for termination. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. Nothing contained herein shall prevent Consultant from employing independent associates, and subconsultants as Consultant may deem appropriate to assist in the performance of services hereunder.
10. Independent Consultant
Consultant is retained as an independent contractor and is not an employee of City. No employee or agent of Consultant shall become an employee of City. The work to be performed shall be in accordance with the work described in this Agreement, subject to such directions and amendments from City as herein provided.
11. Insurance. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City it has secured all insurance required under Exhibit D (Insurance Requirements), attached hereto and incorporated herein by this reference. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required therein.
12. Indemnification .
a. To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
b. If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.
13. California Labor Code Requirements.
a. Consultant is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects (“Prevailing Wage Laws”). If the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is One Thousand Dollars and Zero Cents ($1,000.00) or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll
38077.00180\29167975.12 C2
4 records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
b. If the services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such services must be registered with the Department of Industrial Relations.
Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
c. This Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor.
14. Verification of Employment Eligibility.
By executing this Agreement, Consultant verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.
15. Laws and Venue.
This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the County of Santa Clara, State of California.
16. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giving ten (10) calendar days written notice to Consultant. In such event, City shall be immediately given title and possession to all original field notes, drawings and specifications, written reports and other documents produced or developed for that portion of the work completed and/or being abandoned. City shall pay Consultant the reasonable value of services rendered for any portion of the work completed prior to termination. If said termination occurs prior to completion of any task for the Project for which a payment request has not been received, the charge for services performed during such task shall be the reasonable value of such services, based on an amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Consultant shall not be entitled