POLYETHYLENE SHEET ENCASEMENT (AWWA C105) 099754-2
Main Lift Station Force Main B Air Release Valves Replacement Project
B. Minimum Width: 2 inches.
C. Products: Canusa Wrapid Tape; Tapecoat 35; Polyken 934; AA Thread Seal Tape, Inc.; or equal.
PART 3 - EXECUTION
3.01 APPLICATION OF MOLDABLE MASTIC FILLER TO IRREGULAR ADJACENT
SURFACES
When the adjacent joints are bell-and-spigot or mechanical joints and any associated welding specifications do not require an external full fillet weld, apply a moldable mastic filler (per Section 400500) at the step-down area prior to the application of the sheet encasement and tape. Polywrap edges shall extend 6” beyond area to be protected.
3.02 APPLYING SHEET COATING TO BURIED PIPING AND FITTINGS A. Apply wrapping per AWWA C105 as modified herein.
B. Apply a double wrapping.
C. Install the polyethylene to completely encase the pipe and fittings to provide a watertight corrosion barrier. Continuously secure overlaps and ends of sheet and tube with polyethylene tape. Make circumferential seams with two complete wraps, with no exposed edges. Tape longitudinal seams and longitudinal overlaps, extending tape beyond and beneath circumferential seams.
D. Wrap bell-spigot interfaces, restrained joint components, and other irregular surfaces with wax tape or moldable sealant prior to placing polyethylene encasement.
E. Minimize voids beneath polyethylene. Place circumferential or spiral wraps of polyethylene tape at 2-foot intervals along the barrel of the pipe to minimize the space between the pipe and the polyethylene.
F. Overlap adjoining polyethylene tube coatings a minimum of 1 foot and wrap prior to placing concrete anchors, collars, supports, or thrust blocks. Hand wrap the polyethylene sheet, apply two complete wraps with no exposed edges to provide a watertight corrosion barrier, and secure in place with 2-inch-wide plastic adhesive tape.
3.03 APPLYING SHEET COATING TO BURIED VALVES
A. Wrap flanges and other irregular surfaces with wax tape per 099752. Press tightly into place leaving no voids underneath and a smooth surface under coating for polyethylene sheet.
B. Wrap with a flat sheet of polyethylene. Place the sheet under the valve and the flanges or joints with the connecting pipe and fold in half. Extend the sheet to the valve stem and
POLYETHYLENE SHEET ENCASEMENT (AWWA C105) 099754-3
Main Lift Station Force Main B Air Release Valves Replacement Project
secure the sheet in place with 2-inch-wide plastic adhesive tape. Apply a second layer and secure with tape. Make two complete wraps, with no exposed edges, to provide a watertight corrosion barrier. Secure the sheets with tape around the valve stem below the operating nut and around the barrel of the connecting pipe to prevent the entrance of water and soil. Place concrete anchor and support blocks after the wrap has been installed.
3.04 APPLYING SHEET COATING TO BURIED FLEXIBLE PIPE COUPLINGS A. Wrap irregular surfaces with wax tape or moldable sealant. Press tightly into place leaving no voids underneath and a smooth surface under coating for polyethylene sheet.
B. Apply two layers or wraps around the coupling. Overlap the adjoining pipe or fitting a minimum of 1 foot and secure in place with tape. Provide sufficient slack in polyethylene to allow backfill to be placed around fitting without tearing polyethylene.
Apply tape around the entire circumference of the overlapped section on the adjoining pipe or fitting in two complete wraps, with no exposed edges, to provide a watertight corrosion barrier.
3.05 REPAIR OF POLYETHYLENE MATERIAL
Repair polyethylene material that is damaged during installation. Use polyethylene sheet, place over damaged or torn area, and secure in place with 2-inch-wide plastic adhesive tape.
3.06 APPLYING SHEET COATING TO EXISTING BURIED PIPING
When connecting polyethylene-encased pipe or fittings to existing pipe, expose existing pipe, thoroughly clean the surface, and securely tape the end of the polyethylene to the existing as specified above. When the existing pipe is polyethylene encased, wrap new polyethylene encasement over the existing, with overlap of at least 2 feet. Tape securely as specified above.
3.07 BACKFILL FOR POLYETHYLENE-WRAPPED PIPE, VALVES, AND FITTINGS Place sand backfill within 1 foot of the pipe, valves, and fittings wrapped with polyethylene encasement.
3.08 INSTALLATION AND REPAIR OF POLYETHYLENE AT SERVICE TAPS A. Wrap two or three layers of polyethylene adhesive tape completely around the pipe to cover the area where the tapping machine and chain will be mounted.
B. Mount the tapping machine on the pipe area covered by the polyethylene tape. Then make the tap and install the corporation stop directly through the tape and polyethylene.
C. After making the direct service connection, inspect the entire circumferential area for damage and make repairs.
POLYETHYLENE SHEET ENCASEMENT (AWWA C105) 099754-4
Main Lift Station Force Main B Air Release Valves Replacement Project
D. To minimize the possibility of dissimilar metal corrosion at service connections, wrap the corporation stop and copper service lateral a minimum clear distance of 3 feet from the main with polyethylene or dielectric tape.
END OF SECTION
FUSION-BONDED EPOXY LININGS 099761-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 099761 FUSION-BONDED EPOXY LININGS AND COATINGS PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials, application, and testing of one-part, fusion-bonded, heat- cured, thermosetting, 100% solids epoxy linings and coatings on steel, cast-iron, and ductile-iron equipment, such as valves, flexible pipe couplings, and pipe.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Painting and Coating: 099000.
B. Ductile Iron Pipe: 402040
1.03 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Submit manufacturer's catalog literature and product data sheets, describing the physical and chemical properties of the epoxy lining. Describe application and curing procedure.
C. Submit coating application test records for measuring lining thickness and holiday detection for each item or pipe section and fitting. Describe repair procedures used.
D. For field applied coatings, submit qualifications of the coating contractor:
1. Copy of Contractor’s license valid for the State of California
2. Three references from projects completed within the last 5 years.
3. Written certification that each applicator performing Work on the Project is trained and qualified to perform the Work.
4. Written certification from the CONTRACTOR that they are qualified to apply the coating system specified.
PART 2 - MATERIALS
2.01 PIPING AND EQUIPMENT SURFACES
A. The Contractor shall require the equipment suppliers to provide equipment that is free of salts, oil, and grease to the coating applicator.
FUSION-BONDED EPOXY LININGS 099761-2
Main Lift Station Force Main B Air Release Valves Replacement Project
B. The Contractor shall require pipe suppliers to provide bare pipe that is free of salts, oil, and grease to the coating applicator.
2.02 SHOP-APPLIED EPOXY LINING AND COATING
Lining and coating shall be 100% solids, thermosetting, fusion-bonded, dry powder epoxy resin: Scotchkote 134 or 206N, Valspar "Pipeclad 1500 Red," or equal. Epoxy lining shall meet or exceed the following requirements:
Hardness (minimum) Barcol 17 (ASTM D2583)
Rockwell 50 ("M" scale)
Abrasion resistance
(maximum value)
1,000 cycles: 0.05 gram removed
5,000 cycles: 0.115 gram removed
ASTM D1044, Tabor CS 17 wheel, 1,000-gram
weight
Adhesion (minimum) 3,000 psi (Elcometer)
Tensile strength 7,300 psi (ASTM D2370)
Penetration 0 mil (ASTM G17)
Adhesion overlap shear, 1/8-
inch steel panel, 0.010 glue
line
4,300 psi, ASTM D1002
Impact (minimum value) 100 inch-pounds (Gardner 5/8-inch diameter tup)
2.03 FIELD-APPLIED EPOXY FOR PATCHING
Use a minimum 80% solids liquid epoxy resin, Scotchkote 306 or 323+, or equal.
2.04 LINING OF GROOVED-END AND FLEXIBLE PIPE COUPLINGS
Line couplings the same as the pipe.
PART 3 - EXECUTION
3.01 SHOP APPLICATION OF FUSION-BONDED EPOXY LINING AND COATING--
GENERAL
A. Grind surface irregularities, welds, and weld spatter smooth before applying the epoxy.
The allowable grind area shall not exceed 0.25 square foot per location, and the maximum total grind area shall not exceed 1 square foot per item or piece of equipment.
Do not use any item, pipe, or piece of equipment in which these requirements cannot be met.
FUSION-BONDED EPOXY LININGS 099761-3
Main Lift Station Force Main B Air Release Valves Replacement Project
B. Remove surface imperfections, such as slivers, scales, burrs, weld spatter, and gouges.
Grind outside sharp corners, such as the outside edges of flanges, to a minimum radius of 1/4 inch.
C. Uniformly preheat the pipe, item, or piece of equipment prior to blast cleaning to remove moisture from the surface. The preheat shall be sufficient to ensure that the surface temperature is at least 5°F above the dew point temperature during blast cleaning and inspection.
D. Sandblast surfaces per SSPC SP-5. Protect beveled pipe ends from the abrasive blast cleaning.
E. Apply lining and coating by the electrostatic spray or fluidized bed process. Minimum thickness of lining or coating shall be 15 mils. Heat and cure per the epoxy manufacturer's recommendations. The heat source shall not leave a residue or contaminant on the metal surface. Do not allow oxidation of surfaces to occur prior to coating. Do not permit surfaces to flash rust before coating.
3.02 SHOP APPLICATION OF FUSION-BONDED EPOXY LINING AND COATING TO
PIPE--ADDITIONAL REQUIREMENTS
A. Apply lining and coating per AWWA C213 except as modified herein.
B. Grind 0.020 inch (minimum) off the weld caps on the pipe weld seams before beginning the surface preparation and heating of the pipe.
3.03 QUALITY OF LINING AND COATING APPLICATIONS
The cured lining shall be smooth and glossy, with no graininess or roughness. The lining shall have no blisters, cracks, bubbles, underfilm voids, mechanical damage, discontinuities, or holidays.
3.04 FACTORY TESTING OF LINING AND COATING --GENERAL
A. Test linings with a low-voltage wet sponge holiday detector. Test pipe linings per AWWA C213, Section 5.3.3. If the number of holidays or pinholes is fewer than one per 20 square feet of coating surface, repair the holidays and pinholes by applying the coating manufacturer's recommended patching compound to each holiday or pinhole and retest. If the number of pinholes and holidays exceeds one per 20 square feet of coating surface, remove the entire lining and recoat the item or pipe.
B. Measure the lining thickness at three locations on each item or piece of equipment or pipe section using a coating thickness gauge calibrated at least once per eight-hour shift.
Record each measured thickness value. Where individual measured thickness values are less than the specified minimum thickness, measure the coating thickness at three additional points around the defective area. The average of these measurements shall exceed the specified minimum thickness value, and no individual thickness value shall be more than 2 mils below or 3 mils above the specified minimum value. If a section of
FUSION-BONDED EPOXY LININGS 099761-4
Main Lift Station Force Main B Air Release Valves Replacement Project
the pipe, item, or piece of equipment does not meet these criteria, remove the entire lining or coating and recoat the entire item or piece of equipment.
3.05 FACTORY INSPECTION OF LINING AND COATING OF PIPE--ADDITIONAL
REQUIREMENTS
Check for lining defects on the weld seam centerlines. There shall be no porous blisters, craters, or pimples lying along the peak of the weld crown.
3.06 SHIPPING, STORAGE, AND HANDLING
A. When loading piping, fittings, couplings, or other coated items for shipment to the project site, use spacers and other protective devices to separate pipes or other coated items to prevent damaging the coated surfaces during transit and unloading. If wood spacers are used, remove wood splinters and particles from the coated surfaces after separation. Use padded chains or ribbon binders to secure the loaded pipe or other coated items and minimize damage.
B. Do not load or unload pipe, fittings, couplings, or other coated items by inserting forklift tines or lifting chains inside the pipe or item. Use nonmetallic slings, padded chains, or padded forklift tines to lift pipe or other coated items.
C. Cover piping or other coated items 100% with protective coverings or tarpaulins to prevent deposition of road salts, fuel residue, and other contaminants in transit.
D. Provide stulls, braces, and supports for piping during shipping and storage such that out- of-roundness or deflection does not exceed 0.5% of the pipe diameter.
E. Handle piping and other coated items with care during the unloading, installation, and erection operations to minimize damage. Do not place or store pipe or other coated items on the ground or on top of other work unless ground or work is covered with a protective covering or tarpaulin. Place pipe or other coated items above the ground upon platforms, skids, or other supports.
F. Store piping or other coated items at the site on pallets to prevent direct contact with ground or floor. Cover pipe or coated items during storage with protective coverings or tarpaulins to prevent deposition of rainwater, salt air, dirt, dust, and other contaminants.
G. Do not allow piping or other coated items to contact metal, concrete, or other surfaces during storage, handling, or installation and erection at the site that could damage or scratch the coating.
3.07 FIELD REPAIRS
Patch scratches and damaged areas incurred while installing fusion-bonded epoxy coated items with a two-component, 80% solids (minimum), liquid epoxy resin. Wire brush or sandblast the damaged areas per SSPC SP-10. Lightly abrade or sandblast the coating or lining on the sides of the damaged area before applying the liquid epoxy coating. Apply
FUSION-BONDED EPOXY LININGS 099761-5
Main Lift Station Force Main B Air Release Valves Replacement Project
an epoxy coating to defective linings and coatings to areas smaller than 20 square inches.
Patched areas shall overlap the parent or base coating a minimum of 0.5 inch. If a defective area exceeds 20 square inches, remove the entire lining and coating and recoat the entire item or piece of equipment. Apply the liquid epoxy coating to a minimum dry- film thickness of 15 mils.
END OF SECTION
FUSION-BONDED EPOXY LININGS 099761-6
Main Lift Station Force Main B Air Release Valves Replacement Project
THIS PAGE INTENTIONALLY LEFT BLANK
EXPANDED METAL AIR RELEASE VALVE ENCLOSURES 133438-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 133438 EXPANDED METAL AIR RELEASE VALVE ENCLOSURES PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials and installation of prefabricated steel expanded metal enclosures for use with aboveground air release valves.
1.02 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300 Submittals.
B. Submit dimensional drawings and field installation or assembly drawings. Show materials of construction and show the location of the proposed concrete pad, piping, and equipment within the enclosure. The Contractor shall verify that the piping, valves, and equipment proposed fit within the enclosures supplied and that the enclosures can open and close freely prior to equipment purchase.
PART 2 - MATERIALS
2.01 MANUFACTURERS
Enclosures shall be, custom dual swing leaf, by Le Meur, no equal.
2.02 DESIGN AND CONSTRUCTION
A. Construct enclosures of steel expanded metal conforming to ASTM F1267. Minimum mesh size shall be No. 9.
B. Provide 3/16-inch thick angles on the corners to support the expanded metal panels and provide access to the enclosed equipment. Material of construction shall be the same as for the expanded metal.
C. Furnish type 316 stainless steel mounting hardware. Furnish locking assembly. Furnish two heavy duty utility locks for each enclosure. Assembly fasteners shall be stainless steel. Anchor hardware shall be adjustable up to 1.5 inches vertically to accommodate uneven concrete slabs.
EXPANDED METAL AIR RELEASE VALVE ENCLOSURES 133438-2
Main Lift Station Force Main B Air Release Valves Replacement Project
PART 3 - EXECUTION
3.01 FACTORY-APPLIED PAINTING AND COATING FOR CARBON STEEL
ENCLOSURES
Coating shall be a powder-applied polymer material: polyester or epoxy and polyester combinations having a minimum thickness of 3 mils or polyolefin elastomer having a minimum thickness of 7 mils.
3.02 INSTALLATION
A. Enclosure side and roof panels shall fit together secured internally with mechanical fasteners or by welding.
B. Securely attach the enclosure to an existing concrete base with anchor brackets through the angle bases of the enclosure itself or through an anchor hinge.
3.03 SERVICE CONDITIONS
A. Enclosure service conditions shall be as shown below.
B. Enclosures:
Enclosure Tag
Numbers Minimum Dimensions Color
ARV NOS 2,3,4,5
and 7
CUSTOM DUAL SWING LEAF
ENCLOSURE WITH DUAL
HINGES
24” Wide x 60” Long x 69” Tall
with dual lifting handles, square
edges and locking mechanism.
Forest Green
1. Confirm clearance prior to installation verify box can be opened without restriction. Provide submittal per Drawing G-02 Project Note 2.
2. Valve enclosure shall be manufactured by Le Meur no equal.
3. All valve enclosures shall be installed per manufacture’s instruction, or as directed by the Engineer.
4. Wash enclosure assembly with degreasing cleaner, apply two coats of water based corrosion resistant, acrylic primer, one coat of acrylic enamel (forest green), anti- graffiti coating.
END OF SECTION
EARTHWORK 312300-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 312300 EARTHWORK
PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials, testing, and installation of earthwork for excavations and backfill.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. General Concrete Construction: 030500.
1.03 SUBMITTALS
A. Submit a report from a testing laboratory verifying that the material conforms to the gradation specified.
1.04 TESTING FOR COMPACTION
A. Owner shall test for compaction and relative density as described below.
B. Determine the density of soil in place by the sand cone method, ASTM D1556 or by nuclear methods, ASTM D6938. Additional sand cones and densities will be required if the backfill material is visually variable. The minimum depth for the sand cone test hole shall be 12 inches. The minimum size shall be 8 inches, and size 16/30 or 10/20 silica sand shall be used. Compaction tests will be performed for each lift or layer.
C. Determine laboratory moisture-density relations of soils per ASTM D1557. If nuclear methods are used for in-place density determination, the compaction test results for maximum dry density and optimum water content shall be adjusted in accordance with ASTM D4718. This will be required for determination of percent relative compaction and moisture variation from optimum.
D. Determine the relative density of cohesionless soils per ASTM D4253 and D4254.
E. Sample materials per ASTM D75.
F. "Relative compaction" is the ratio, expressed as a percentage, of the inplace dry density to the laboratory maximum dry density.
G. Compaction shall be deemed to comply with the specifications when no test falls below the specified relative compaction. The Contractor shall pay the costs of any retesting of Work not conforming to the specifications.
EARTHWORK 312300-2
Main Lift Station Force Main B Air Release Valves Replacement Project
1.05 DISPOSAL OF EXCESS MATERIALS
Excess site excavated or wasted material shall be disposed of offsite by the Contractor at his expense. No prearranged disposal site or related permits have been determined or secured by the City.
PART 2 - MATERIALS
2.01 FILL
Fill is material that is to be placed adjacent to and around structures to the limits indicated in the drawings. Material shall be excavated material that is free from organic matter, roots, debris, and rocks larger than 3 inches in the greatest dimension.
2.02 SAND
A. Granular material free from clay balls, organic matter, and other deleterious substances and conforming to the following gradations:
Sieve Size Percent Passing By Weight
3/8 inch 100
No. 4 75 to 100
No. 30 12 to 50
No. 100 5 to 20
No. 200 0 to 10
B. Sand shall have a minimum sand equivalent of 30 per ASTM D2419.
2.03 WATER FOR COMPACTION
Water shall be free of organic materials and shall have a pH of 7.0 to 9.0, a maximum chloride concentration of 500 mg/L, and a maximum sulfate concentration of 500 mg/L.
Provide all water needed for earthwork. Provide temporary piping and valves to convey water from the source to the point of use. Provide any meters if the water is taken from a city, water district, or agency pipeline.
2.04 AGGREGATE BASE
Aggregate base shall be crushed aggregate base as specified in Section 200-2.2 of the Standard Specifications for Public Works Construction, 2021 edition.
EARTHWORK 312300-3
Main Lift Station Force Main B Air Release Valves Replacement Project
PART 3 - EXECUTION
3.01 EXCAVATION
A. If necessary, excavations shall have sloping, sheeting, shoring, and bracing conforming with 29CFR1926 Subpart P-Excavations, CAL/OSHA requirements, and the General Provisions.
B. Excavation is unclassified. Perform excavation regardless of the type, nature, or condition of the material encountered to accomplish the construction.
3.02 PREPARATION FOR PLACING FILL
A. After excavation of existing material or removal of unacceptable material at the exposed subgrade, scarify the final subgrade surface to a depth of 12 inches and compact to 95% relative compaction.
B. Remove foreign materials and trash from the excavation before placing any fill material.
3.03 PLACING AND COMPACTING FILL
A. Place in maximum 8-inch lifts and compact each lift to 95% relative compaction.
3.04 MOISTURE CONTROL
During the compacting operations, maintain optimum practicable moisture content required for compaction purposes in each lift of the material. Maintain uniform moisture content throughout the lift. Supplement by sprinkling the material. At the time of compaction, the water content of the material shall be at optimum water content or within 2 percentage points above optimum.
3.05 PLACING AND COMPACTING AGGREGATE BASE
A. Place the aggregate base in 6-inch lifts and compact to 95% relative compaction.
END OF SECTION
EARTHWORK 312300-4
Main Lift Station Force Main B Air Release Valves Replacement Project
THIS PAGE LEFT INTENTIONALLY BLANK
GENERAL PIPING REQUIREMENTS 400500-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 400500 GENERAL PIPING REQUIREMENTS
PART 1 - GENERAL
1.01 DESCRIPTION
This section describes the general requirements for selecting piping materials; selecting the associated bolts, nuts, and gaskets for flanges for the various piping services in the Project; and miscellaneous piping items.
1.02 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Submit affidavit of compliance with referenced standards (e.g., AWWA, ANSI, ASTM, etc.).
C. Submit certified copies of mill test reports for bolts and nuts, including coatings if specified. Provide recertification by an independent domestic testing laboratory for materials originating outside of the United States.
D. Submit manufacturer's data sheet for gaskets supplied showing dimensions and bolting recommendations.
1.03 DEFINITIONS OF BURIED AND EXPOSED PIPING
A. Buried piping is piping buried in the soil, commencing at the wall or beneath the slab of a structure. Where a coating is specified, provide the coating up to the structure wall.
Unless detailed otherwise, coating shall penetrate wall no less than 1 inch. Piping encased in concrete is considered to be buried. Do not coat encased pipe.
B. Exposed piping is piping in any of the following conditions or locations:
1. Above ground.
2. Inside buildings, vaults, or other structures.
3. In underground concrete trenches or galleries.
PART 2 - MATERIALS
2.01 MATERIALS SELECTION AND ALTERNATIVE MATERIALS
A. The drawings may show alternative piping materials for certain services. In such cases, the same pipe material shall be used for all pipe sizes in all locations for the given piping service. Do not intermix piping materials.
GENERAL PIPING REQUIREMENTS 400500-2
Main Lift Station Force Main B Air Release Valves Replacement Project
2.02 THREAD FORMING FOR STAINLESS STEEL BOLTS
Form threads by means of rolling, not cutting or grinding.
2.03 BOLTS AND NUTS FOR FLANGES FOR STEEL AND DUCTILE-IRON PIPING A. Bolts and nuts for Class 125 or 150 flanges (including AWWA C207, Class D) located indoors shall be Type 316 stainless steel conforming to ASTM A193, Grade B8M for bolts and ASTM A194, Grade 8M for nuts.
B. Bolts and nuts for buried or submerged Class 125 or 150 flanges shall be Type 316 stainless steel conforming to ASTM A193, Grade B8M for bolts and ASTM A194, Grade 8M for nuts.
C. Bolts used in flange insulation kits shall conform to ASTM A193 (Grade B7). Nuts shall conform to ASTM A194 (Grade 2H).
D. Provide washers for each nut. Washers shall be of the same material as the nuts.
2.04 LUBRICANT FOR STAINLESS STEEL BOLTS AND NUTS
Lubricant shall be chloride free and shall be RAMCO TG-50, Anti-Seize by RAMCO, Specialty Lubricants Corporation Husky Lube O'Seal, or equal.
2.05 GASKETS FOR FLANGES FOR DUCTILE IRON PIPING
A. Gaskets for flat face and raised face flanges shall be 1/16-inch for pipes 6 inches in diameter and smaller or 1/8-inch thick for larger pipes and shall be one of the following nonasbestos materials:
1. Aramid fiber-inserted rubber gaskets. Gaskets shall be suitable for a pressure of 200 psi at a temperature of 180°F. Products: Garlock Multi-Swell 3760-U or equal.
2. Glass microsphere filler bound with PTFE. Products: Garlock Gylon Style 3505 or equal. Gaskets shall be suitable for a pressure of 500 psi at a temperature of 400°F.
PART 3 - EXECUTION
3.01 RAISED FACE AND FLAT FACE FLANGES
Where a raised face flange connects to a flat-faced flange, remove the raised face of the flange.
3.02 INSTALLING FLANGED PIPING
A. Set pipe with the flange bolt holes straddling the pipe horizontal and vertical centerline.
Install pipe without springing, forcing, or stressing the pipe or any adjacent connecting valves or equipment. Before bolting up, align flange faces to the design plane within
GENERAL PIPING REQUIREMENTS 400500-3
Main Lift Station Force Main B Air Release Valves Replacement Project
1/16 inch per foot measured across any diameter. Align flange bolt holes within 1/8-inch maximum offset.
B. Inspect each gasket to verify that it is the correct size, material, and type for the specified service and that it is clean and undamaged. Examine bolts or studs, nuts, and washers for defects such as burrs or cracks and rust and replace as needed.
C. Clean flanges by wire brushing before installing flanged fittings. Clean flange bolts and nuts by wire brushing, lubricate carbon steel bolts with oil and graphite, and tighten nuts uniformly and progressively.
D. Bolt lengths shall extend completely through their nuts. Any that fail to do so shall be considered acceptably engaged if the lack of complete engagement is not more than one thread.
E. Do not use more than one gasket between contact faces in assembling a flanged joint.
F. Tighten the bolts to the manufacturer’s specifications, using the recommended cross bolt pattern in multiple steps of increasing torque, until the final torque requirements are achieved. Do not over torque.
G. If flanges leak under pressure testing, loosen or remove the nuts and bolts, reset or replace the gasket, reinstall or retighten the bolts and nuts, and retest the joints. Joints shall be watertight.
3.03 INSTALLING GROOVED-END PIPING
A. Install grooved-end pipe and fittings in accordance with the coupling manufacturer's recommendations and the following.
B. Clean loose scale, rust, oil, grease, and dirt from the pipe or fitting groove before installing coupling. Apply the coupling manufacturer's gasket lubricant to the gasket exterior including lips, pipe ends, and housing interiors.
C. Fasten coupling alternately and evenly until coupling halves are seated. Use torques as recommended by the coupling manufacturer.
3.04 INSTALLATION OF STAINLESS STEEL BOLTS AND NUTS
Prior to assembly, coat threaded portions of stainless steel bolts and nuts with lubricant.
END OF SECTION
GENERAL PIPING REQUIREMENTS 400500-4
Main Lift Station Force Main B Air Release Valves Replacement Project
THIS PAGE LEFT INTENTIALNLLY BLANK
PRESSURE TESTING OF PIPING 400515-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 400515 PRESSURE TESTING OF PIPING
PART 1 - GENERAL
1.01 DESCRIPTION
This section specifies the cleaning, hydrostatic, and leakage testing of pressure piping for water piping and wastewater piping.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. General Piping Requirements: 400500.
B. Manual, Check and Process Valves: 400520.
C. Ductile Iron Pipe: 402040.
1.03 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Submit test bulkhead locations and design calculations, pipe attachment details, and methods to prevent excessive pipe wall stresses.
C. Submit test records to the Construction Manager upon completion of the testing.
1.04 TEST PRESSURES
Test pressures for the various services and types of piping are shown the subsection on “Test Pressure and Test Fluids” in Part 3.
1.05 TESTING RECORDS
Provide records of each piping installation during the testing. These records shall include:
A. Date and times of test.
B. Identification of pipeline, or pipeline section tested or retested.
C. Identification of pipeline material.
D. Identification of pipe specification.
E. Test fluid.
F. Test pressure at low point in pipeline section.
PRESSURE TESTING OF PIPING 400515-2
Main Lift Station Force Main B Air Release Valves Replacement Project
G. Remarks: Leaks identified (type and location), types of repairs, or corrections made.
H. Certification by Contractor that the leakage rate measured conformed to the specifications.
PART 2 - MATERIALS
2.01 MANUAL AIR-RELEASE VALVES
Provide temporary manual air-release valves at test bulkheads for pipeline test.
Construct the pipe outlet in the same manner as for a permanent air valve and after use, seal with a blind flange, pipe cap, or plug and coat the same as the adjacent pipe.
2.02 TEST BULKHEADS
Design and fabricate test bulkheads per Section VIII of the ASME Boiler and Pressure Vessel Code. Materials shall comply with Part UCS of said code. Design pressure shall be at least 2.0 times the specified test pressure for the section of pipe containing the bulkhead. Limit stresses to 70% of yield strength of the bulkhead material at the bulkhead design pressure. Include air-release and water drainage connections.
2.03 TESTING FLUID
A. For potable water and wastewater pipelines, obtain and use only potable water for hydrostatic testing.
2.04 TESTING EQUIPMENT
Provide calibrated pressure gauges, pipes, bulkheads, pumps, compressors, chart recorder, and meters to perform the hydrostatic testing.
PART 3 - EXECUTION
3.01 TESTING PREPARATION
A. Pipes shall be in place, backfilled, and anchored before commencing pressure testing.
B. Conduct pressure tests on exposed and aboveground piping after the piping has been installed and attached to the pipe supports, hangers, anchors, expansion joints, valves, and meters.
C. For buried piping, the pipe may be partially backfilled and the joints left exposed for inspection during an initial leakage test. Perform the final pressure test, however, after completely backfilling and compacting the trench.
D. Provide any temporary piping needed to carry the test fluid to the piping to be tested.
After the test has been completed and demonstrated to comply with the specifications,
PRESSURE TESTING OF PIPING 400515-3
Main Lift Station Force Main B Air Release Valves Replacement Project
disconnect and remove temporary piping. Do not remove exposed vent and drain valves at the high and low points in the tested piping; remove any temporary buried valves and cap the associated outlets. Plug taps or connections to the existing piping from which the test fluid was obtained.
E. Provide temporary drain lines needed to carry testing fluid away from the pipe being tested. Remove such temporary drain lines after completing the pressure testing. Pipes shall remain full after testing.
F. Prior to starting the test, the Contractor shall notify the Construction Manager. Provide a 48-hour advance notice.
3.02 CLEANING
A. Before conducting hydrostatic tests, flush pipes with water to remove dirt and debris.
Maintain a flushing velocity of at least 3 fps for water testing. Flush pipes for time period as given by the formula
T = 2L
3 in which:
T = flushing time (seconds)
L = pipe length (feet)
3.03 TESTING NEW PIPE WHICH CONNECTS TO EXISTING PIPE
Prior to testing new pipelines to be connected to existing pipelines, isolate the new line from the existing line by means of test bulkheads, spectacle flanges, or blind flanges.
After successfully testing the new line, remove test bulkheads or flanges and connect to the existing piping.
3.04 HYDROSTATIC TESTING OF ABOVEGROUND OR EXPOSED PIPING A. Open vents at high points of the piping system to purge air while filling the pipe with water. Venting during system filling may also be provided by temporarily loosening flanges.
B. Subject the piping system to the test pressure indicated. Maintain the test pressure for a minimum of four hours. Examine joints, fittings, valves, and connections for leaks. The piping system shall show zero leakage or weeping. Correct leaks and retest until zero leakage is obtained.
PRESSURE TESTING OF PIPING 400515-4
Main Lift Station Force Main B Air Release Valves Replacement Project
3.05 REPETITION OF TEST
If the actual leakage exceeds the allowable, locate and correct the faulty work and repeat the test. Restore the work and all damage resulting from the leak and its repair. Eliminate visible leakage.
3.06 BULKHEAD AND TEST FACILITY REMOVAL
After a satisfactory test, remove the testing fluid, remove test bulkheads and other test facilities, and restore the pipe coatings.
3.07 TEST PRESSURE AND TEST FLUIDS
A. Testing and design pressures (psig) shall be as listed below:
Pipe Service
Pipe
Material Testing Fluid
Test
Pressure
Wastewater DIP Potable Water 150 PSI
END OF SECTION
MANUAL, CHECK, AND PROCESS VALVES 400520-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 400520 MANUAL PROCESS VALVES
PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials, testing, and installation of manually operated valves including ball valves.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. General Piping Requirements: 400500.
B. Pressure Testing of Piping: 400515.
C. Equipment, Piping, and Valve Identification: 400775.
1.03 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Submit manufacturer's catalog data and detail construction sheets showing all valve parts. Describe each part by material of construction, specification (such as AISI, ASTM, SAE, or CDA), and grade or type.
C. Show valve dimensions including laying lengths. Show port sizes. Show dimensions and orientation of valve actuators, as installed on the valves. Show location of internal stops for gear actuators. State differential pressure and fluid velocity used to size actuators.
For worm-gear actuators, state the radius of the gear sector in contact with the worm and state the handwheel diameter.
D. Show valve linings and coatings. Submit manufacturer's catalog data and descriptive literature.
E. Submit a report verifying that the valve interior linings and exterior coatings have been tested for holidays and lining thickness. Describe test results and repair procedures for each valve. Do not ship valves to Project site until the reports have been returned by the Project Manager and marked "Resubmittal not required."
PART 2 - MATERIALS
2.01 GENERAL
A. Install valves complete with operating levers required for operation.
MANUAL, CHECK, AND PROCESS VALVES 400520-2
Main Lift Station Force Main B Air Release Valves Replacement Project
B. Valves shall have the name of the manufacturer and the size of the valve cast or molded onto the valve body or bonnet or shown on a permanently attached plate.
2.02 VALVE ACTUATORS
A. Provide lever actuators for exposed valves 6 inches and smaller.
2.03 BOLTS AND NUTS FOR FLANGED VALVES
Bolts and nuts for flanged valves shall be as described in Section 400500.
2.04 GASKETS FOR FLANGES
Gaskets for flanged end valves shall be as described in Section 400500.
2.05 PAINTING AND COATING
A. Coat metal valves located above ground or in vaults and structures the same as adjacent piping. Apply the specified prime and intermediate and finish coat at the place of manufacture. Finish coat shall match the color of the adjacent piping.
B. Alternatively, line and coat valves with fusion-bonded epoxy per Section 099761.
C. Test the valve interior linings and exterior coatings at the factory with a low-voltage (22.5 to 80 volts, with approximately 80,000-ohm resistance) holiday detector, using a sponge saturated with a 0.5% sodium chloride solution. The lining shall be holiday free.
D. Measure the thickness of the valve interior linings per Section 099000. Repair areas having insufficient film thickness per Section 099000.
E. Do not coat stainless steel valves.
2.06 PACKING, O-RINGS, AND GASKETS
Unless otherwise stated in the detailed valve specifications, packing, O-rings, and gaskets shall be one of the following nonasbestos materials:
A. Teflon.
B. Kevlar aramid fiber.
C. Acrylic or aramid fiber bound by nitrile.
D. Buna-N (nitrile).
2.07 RUBBER SEATS
Rubber seats shall be made of a rubber compound that is resistant to free chlorine and monochloramine concentrations up to 10 mg/L in the fluid conveyed.
MANUAL, CHECK, AND PROCESS VALVES 400520-3
Main Lift Station Force Main B Air Release Valves Replacement Project
2.08 VALVES
A. Ball Valves:
1. Full Port Threaded Stainless Steel Ball Valves 3 Inches and Smaller:
Stainless steel ball valves, 3 inches and smaller, for wastewater service shall be rated at a minimum pressure of 1,000 psi WOG at a temperature of 100°F. Provide full port ball and body design. Valve body, ball, and stem shall be Type 316 stainless steel, ASTM A276 or A351. Seat and seals shall be reinforced Teflon.
Valves shall have lever actuators, plastic coated. Valves shall have threaded ends (ASME B1.20.1) and nonblowout stems. Valves shall be Smith-Cooper Series:
SC201,Worcester Series 59, Apollo 86-100 Series, or equal. Do not coat stainless steel valves.
PART 3 - EXECUTION
3.01 VALVE SHIPMENT AND STORAGE
A. Provide flanged openings with metal closures at least 3/16-inch thick, with elastomer gaskets and at least four full-diameter bolts. Install closures at the place of valve manufacture prior to shipping. For studded openings, use all the nuts needed for the intended service to secure closures. Alternatively, ship flanged valves 3 inches and smaller in separate sealed cartons or boxes.
B. Provide threaded openings with steel caps or solid-shank steel plugs. Do not use nonmetallic (such as plastic) plugs or caps. Install caps or plugs at the place of valve manufacture prior to shipping. Alternatively, ship valves having threaded openings or end connections in separate sealed cartons or boxes.
C. Store resilient seated valves in sealed polyethylene plastic enclosures with a minimum of one package of desiccant inside. Store resilient seated valves in the open or unseated position. Valves with adjustable packing glands shall have the packing gland loosened prior to storage. Inspect valves at least once per week, replace desiccant if required and repair damaged storage enclosures. Do not store valves with resilient seats near electric motors or other electrical equipment.
D. Inspect valves on receipt for damage in shipment and conformance with quantity and description on the shipping notice and order. Unload valves carefully to the ground without dropping. Use forklifts or slings under skids. Do not lift valves with slings or chain around operating shaft, actuator, or through waterway. Lift valves with eyebolts or rods through flange holes or chain hooks at ends of valve parts.
E. Protect the valve and actuators from weather and the accumulation of dirt, rocks, and debris. Do not expose rubber seats to sunlight or ozone for more than 30 days. Also, see the manufacturer’s specific storage instructions.
MANUAL, CHECK, AND PROCESS VALVES 400520-4
Main Lift Station Force Main B Air Release Valves Replacement Project
F. Make sure flange faces, joint sealing surfaces, body seats, and disc seats are clean.
Check the bolting attaching the actuator to the valve for loosening in transit and handling. If loose, tighten firmly. Open and close valves having manual or power actuators to make sure the valve operates properly and that stops or limit switches are correctly set so that the valve seats fully. Close valve before installing.
3.02 FACTORY PRESSURE TESTING
A. Hydrostatically test the valve pressure-containing parts at the factory per the valve specification or per the referenced standard. If no testing requirement is otherwise specified or described in the referenced standards, then test with water for 30 minutes minimum at a pressure of 1.5 times the rated pressure but not less than 20 psig. Test shall show zero leakage. If leaks are observed, repair the valve and retest. If dismantling is necessary to correct valve deficiencies, then provide an additional operational test and verify that the valve components function.
B. The chloride content of liquids used to test austenitic stainless steel materials shall not exceed 50 ppm. To prevent deposition of chlorides as a result of evaporative drying, remove residual liquid from tested parts at the conclusion of the test.
3.03 INSTALLING VALVES—GENERAL
A. Remove covers over flanged openings and plugs from threaded openings, after valves have been placed at the point to which the valves will be connected to the adjacent piping. Do not remove valves from storage cartons or boxes until they are ready to be installed.
B. Handle valves carefully when positioning, avoiding contact or impact with other equipment, vault or building walls, or trench walls.
C. Clean valve interiors and adjacent piping of foreign material prior to making up valve to pipe joint connection. Prepare pipe ends and install valves in accordance with the pipe manufacturer’s instructions for the joint used. Do not deflect pipe-valve joint. Do not use a valve as a jack to pull pipe into alignment. The installation procedure shall not result in bending of the valve/pipe connection with pipe loading.
D. Make sure valve ends and seats are clean. Check exposed bolting for loosening in transit and handling and tighten to manufacturer’s recommendations. Open and close the valve to make sure it operates properly and that stops or limit switches are correctly set so that the vane, ball, gate, needle, diaphragm, disc, plug, or other seating element seats fully.
Close the valve before installing. Check coatings for damage and repair. Handle valves carefully when positioning, avoiding contact or impact with other equipment or structures.
E. Prior to assembly, coat threaded portions of stainless steel bolts and nuts with lubricant.
MANUAL, CHECK, AND PROCESS VALVES 400520-5
Main Lift Station Force Main B Air Release Valves Replacement Project
3.04 INSTALLING EXPOSED VALVES
A. Unless otherwise indicated in the drawings, install valves in horizontal runs of pipe having centerline elevations 4 feet 6 inches or less above the floor with their operating stems vertical. Install valves in horizontal runs of pipe having centerline elevations between 4 feet 6 inches and 6 feet 9 inches above the floor with their operating stems horizontal.
B. Install valves on vertical runs of pipe that are next to walls with their stems horizontal, away from the wall. Valves on vertical runs of pipe that are not located next to walls shall be installed with their stems horizontal, oriented to facilitate valve operation.
3.05 ASSEMBLING JOINTS
A. Bolt holes of flanged valves shall straddle the horizontal and vertical centerlines of the pipe run to which the valves are attached. Clean flanges by wire brushing before installing flanged valves. Clean flange bolts and nuts by wire brushing, lubricate threads with oil and graphite, and tighten nuts uniformly and progressively. If flanges leak under pressure testing, loosen or remove the nuts and bolts, reseat or replace the gasket, reinstall or retighten the bolts and nuts, and retest the joints. Joints shall be watertight.
B. Clean threaded joints by wire brushing or swabbing. Apply Teflon joint compound or Teflon tape to pipe threads before installing threaded valves. Joints shall be watertight.
C. Install lug-type valves with separate hex head machine bolts at each bolt hole and each flange (two bolts per valve bolt hole).
D. Install grooved-end couplings for valves in accordance with Section 400500.
3.06 VALVE FIELD TESTING
A. Test valves for leakage at the same time that the connecting pipelines are hydrostatically tested. See Section 400515 for pressure testing requirements. Protect or isolate any parts of valves, actuators, or control and instrumentation systems whose pressure rating is less than the pressure test. Valves shall show zero leakage. Repair or replace any leaking valves and retest.
B. Operate manual valves through three full cycles of opening and closing. Valves shall operate from full open to full close without sticking or binding. Do not backfill buried valves until after verifying that valves operate from full open to full closed. If valves stick or bind, or do not operate from full open to full closed, repair or replace the valve and repeat the tests.
C. Gear actuators shall operate valves from full open to full close through three cycles without binding or sticking. The pull required to operate handwheel- or chainwheel- operated valves shall not exceed 40 pounds. The torque required to operate valves having 2-inch AWWA nuts shall not exceed 150 ft-lbs. If actuators stick or bind or if pulling forces and torques exceed the values stated previously, repair or replace the
MANUAL, CHECK, AND PROCESS VALVES 400520-6
Main Lift Station Force Main B Air Release Valves Replacement Project
actuators and repeat the tests. Operators shall be fully lubricated in accordance with the manufacturer's recommendations prior to operating.
END OF SECTION
AIR-RELEASE AND VACUUM-RELIEF VALVES 400560-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 400560 AIR-RELEASE AND VACUUM-RELIEF VALVES
PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials and installation of combination air release and air vacuum relief valves for sewage service.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. General Piping Requirements: 400500.
B. Pressure Testing of Piping: 400515.
C. Manual Process Valves: 400520.
D. Equipment, Piping, Duct, and Valve Identification: 400775.
1.03 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Submit manufacturer's catalog data and detail drawings showing all valve parts and described by material of construction, specification (such as AISI, ASTM, SAE, or CDA), and grade or type. Show linings and coatings. Identify each valve by tag number to which the catalog data and detail sheets pertain.
PART 2 - MATERIALS
2.01 VALVE IDENTIFICATION
Valves are identified in the drawings by size and type number.
2.02 VALVE TAGGING AND IDENTIFICATION
Provide identifying valve tags per Section 400775.
2.03 BOLTS, NUTS, AND GASKETS FOR FLANGED VALVES
See Section 400500 and specification for the pipe to which the valve is attached.
2.04 VALVE DESIGN AND OPERATION
A. The air-release and vacuum-relief valve shall be of a single chamber design with floats housed in a stainless steel body or ductile iron body with epoxy powder coating
AIR-RELEASE AND VACUUM-RELIEF VALVES 400560-2
Main Lift Station Force Main B Air Release Valves Replacement Project
including coated cast iron, steel, or stainless steel ends secured by means of stainless steel tie rods or by a flanged connection. The valve shall have an integral orifice mechanism that shall operate automatically to limit transient pressure rise or shock induced by closure to twice valve rated working pressure. Provide a double (small and large) orifice design.
B. The intake orifice area shall be equal to the nominal size of the valve. The large orifice sealing shall be affected by the flat face of the control float seating against a nitrile rubber O-ring housed in dovetail groove circumferentially surrounding the orifice.
Discharge of pressurized air shall be controlled by the seating and unseating of a small orifice nozzle on a natural rubber seal affixed into the control float. The nozzle shall have a flat seating land surrounding the orifice.
C. Provide a 1/4-inch NPT test/bleed cock.
D. Prior to the ingress of liquid into the valve chamber, as when the pipeline is being filled, valves shall vent through the large orifice. At higher water approach velocities, the valve shall automatically discharge air through the orifice mechanism and reduce water approach velocity.
E. Valve shall not exhibit leaks or weeping of liquid past the large orifice seal at operating pressures of 7 psi to twice rated working pressure.
F. Valves shall respond to the presence of air by discharging it through the small orifice at any pressures within the specified design range and shall remain leak tight in the absence of air.
G. Valves shall react immediately to pipeline drainage or water column separation by the full opening of the large orifice so as to allow unobstructed air intake at the lowest possible negative internal pipeline pressure.
2.05 MATERIALS OF CONSTRUCTION
A. Materials of construction for air-release valves/air and vacuum-relief valves for sewage service shall be as follows:
AIR-RELEASE AND VACUUM-RELIEF VALVES 400560-3
Main Lift Station Force Main B Air Release Valves Replacement Project
Item Material Specification
Top flange, lower flange,
screen mesh, bolts, nuts,
connecting screws, float
screw, and assembly screws
Stainless steel
Or Ductile Iron
AISI Type 316
Top cover Stainless Steel
Or Ductile Iron
–
Barrel Stainless Steel
Or Ductile Iron
AISI Type 316
Floats Polypropylene
Or Stainless Steel
–
Air-release nozzle or orifice
mechanism
Stainless steel AISI Type 316
Nozzle seal and seat Natural rubber –
Nozzle seal retaining plate Stainless steel AISI Type 316 Tie rod assembly and support
fasteners
Stainless steel AISI Type 316
Float O-ring seals Nitrile rubber
2.06 VALVE END CONNECTIONS
A. Valves 2 inches and smaller shall have threaded ends. Valves 3 inches and larger shall have flanged ends.
B. Flanges for Class 150 valves shall comply with ASME B16.1, Class 125. Flanges for Class 300 valves shall comply with ASME B16.1, Class 250.
C. Threaded ends shall comply with ASME B1.20.1.
2.07 VALVES
A. Type 2 – 3” Sewage Air/Vacuum Valve Class 150: Valve shall allow unrestricted venting or reentry of air during filling or draining of pipeline. Valve shall seat to prevent sewage from leaking through the valve at any pressure. Valves shall be A.R.I. Model D- 26 (Part # D26SS03) with fully stainless steel construction and including non-slam attachment (Part # ZZPD023-NS), no equal.
B. Type 3 – 1” Sewage Air/Vacuum Valve Class 150: Valve system shall allow venting air during filling of pipelines and to vent small pockets of air which collect in the pipeline.
Valve shall seat to prevent sewage from leaking through the valve at any pressure. Valve shall be APCO ASC Model 400, ductile iron body, with threaded outlet or approved equal.
AIR-RELEASE AND VACUUM-RELIEF VALVES 400560-4
Main Lift Station Force Main B Air Release Valves Replacement Project
PART 3 - EXECUTION
3.01 SERVICE CONDITIONS
A. Special service conditions for valves shall be as described below. Design the valves to incorporate the various conditions presented.
Valve Type
Minimum
Operating Pressure
(psig)
Maximum
Operating
Pressure
(psig)
Seating Pressure
(psi)
Type 2 -10 150 1
Type 3 -10 150 1
B. Valves shall seat drip tight at the specified seating pressure.
3.02 FACTORY TESTING
A. Test each valve per AWWA C512, Section 5 and the following.
B. Hydrostatically test the pressure-containing parts at the factory with water for 30 minutes minimum at a pressure of 1.5 times the rated pressure but not less than 20 psig.
Test shall show zero leakage. If leaks are observed, repair the valve and retest. If dismantling is necessary to correct valve deficiencies, provide an additional operational test per AWWA C512, Section 5 for each affected valve.
C. The chloride content of liquids used to test austenitic stainless steel materials shall not exceed 50 ppm. To prevent deposition of chlorides as a result of evaporative drying, remove residual liquid from tested parts at the conclusion of the test.
3.03 PAINTING AND COATING
A. Do not coat stainless steel valves.
B. Line and coat cast-iron valves with fusion-bonded epoxy per Section 099761. Do not coat seating areas and plastic, bronze, stainless steel, or other high alloy parts. Apply intermediate and finish coats in field. Finish coat shall match the color of the adjacent piping.
3.04 SHIPMENT AND STORAGE
A. Identify the equipment with item and serial numbers and, tag, and pipeline station number. Material shipped separately shall be identified with securely affixed, corrosion- resistant metal tags indicating the item and serial number, and pipeline station numbers of the equipment for which it is intended. In addition, ship crated equipment with duplicate packing lists, one inside and one on the outside of the shipping container.
AIR-RELEASE AND VACUUM-RELIEF VALVES 400560-5
Main Lift Station Force Main B Air Release Valves Replacement Project
B. Pack and ship one copy of the manufacturer’s standard installation instructions with the equipment. Provide the instructions necessary to preserve the integrity of the storage preparation after the equipment arrives at the jobsite and before start-up.
C. Provide flanged openings with metal closures at least 3/16-inch thick, with elastomer gaskets and at least four full-diameter bolts. Provide closures at the place of pump manufacture prior to shipping. For studded openings, use all the nuts needed for the intended service to secure closures.
D. Provide threaded openings with steel caps or solid-shank steel plugs. Do not use nonmetallic (such as plastic) plugs or caps. Provide caps or plugs at the place of pump manufacture prior to shipping.
E. Clearly identify lifting points and lifting lugs on the valves. Identify the recommended lifting arrangement on boxed equipment.
3.05 INSTALLATION
A. Clean flanges by wire brushing before installing flanged valves. Clean flange bolts and nuts by wire brushing, lubricate threads with oil and graphite, and tighten nuts uniformly and progressively. If flanges leak under pressure testing, loosen or remove the nuts and bolts, reseat or replace the gasket, reinstall or retighten the bolts and nuts, and retest the joints. Joints shall be watertight.
B. Clean threaded joints by wire brushing or swabbing. Apply Teflon® joint compound or Teflon® tape to pipe threads before installing threaded valves. Joints shall be watertight.
C. Do not use duct tape and plastic for covering the ends of pipe flanges. Use a solid metal cover with rubber gasket to cover flange openings during installation. These metal covers shall remain in place until the piping is connected to the valves.
D. Do not spring flanges of connecting piping into position. Separately work connecting piping systems into position to bring the piping flanges into alignment with the matching valve flanges. Do not move valves to achieve piping alignment. Do not use electrical heating stress relieving to achieve piping alignment.
E. Line up pipe flange bolt holes with valve nozzle bolt holes within 1/16 inch maximum offset from the center of the bolt hole to permit insertion of bolts without applying any external force to the piping.
F. Flange face separation shall be within the gasket spacing ±1/16 inch. Use only one gasket per flanged connection.
3.06 VALVE FIELD PRESSURE TESTING
Test valves at the same time that the connecting pipelines are pressure tested. See Section 400515 for pressure testing requirements. Protect or isolate any parts of valves,
AIR-RELEASE AND VACUUM-RELIEF VALVES 400560-6
Main Lift Station Force Main B Air Release Valves Replacement Project
operators, or control and instrumentation systems whose pressure rating is less than the test pressure.
END OF SECTION
EQUIPMENT, PIPING, DUCT & VALVE IDENTIFICATION 400775-1 Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 400775 VALVE AND PIPING IDENTIFICATION
PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials and installation of labels for pipes and valves for miscellaneous services.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Painting and Coating: 099000.
B. General Piping Requirements: 400500.
C. Manual Process Valves: 400520.
D. Ductile Iron Pipe: 402040.
1.03 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Submit manufacturer's catalog data and descriptive literature describing materials, colors, letter size, and size of labels.
PART 2 - MATERIALS
2.01 LABELS FOR EXPOSED PIPING
A. Labels for piping shall bear the full piping system name as shown in the drawings.
Provide separate flow directional arrows next to each label. Color, size, and labeling shall conform to ANSI A13.1 and Z535.1. Labels for piping inside buildings shall be vinyl cloth: W. H. Brady Co. B-500 vinyl cloth, Seton Name Plate Corporation Pipe Markers, or equal. Labels for piping located outdoors shall be weather- and UV-resistant acrylic plastic and shall be W. H. Brady Co. B-946, Seton Name Plate Corporation Pipe Markers, or equal.
B. Alternatively, provide preprinted, semirigid, snap-on, color-coded pipe markers. Color, size, and labeling shall conform to ANSI A13.1 and Z535.1. Label shall cover 360 degrees (minimum). Labels shall be fabricated of weather- and UV-resistant acrylic plastic. Labels shall be Seton Nameplate Corporation SetMark pipe marks or equal.
EQUIPMENT, PIPING, DUCT & VALVE IDENTIFICATION 400775-2 Main Lift Station Force Main B Air Release Valves Replacement Project
2.02 LABELS FOR EXPOSED VALVES
Provide each valve of size 3 inches and larger with an identification tag. Tag shall be 2- inch-square or circular aluminum or 1/16-inch-thick fiberglass: W. H. Brady B-60, Seton Name Plate Corp. Series SVT, or equal. Aluminum tags shall have black-filled letters.
Tag shall show the valve tag number and/or name or designation as given in the drawings.
PART 3 - EXECUTION
3.01 INSTALLING PIPE LABELS
A. Provide label and flow arrow at each connection to meter or other mechanical equipment, at wall boundaries, at tees and crosses, and at 5-foot centers on straight runs of piping.
B. On piping having external diameters less than 6 inches (including insulation, if any), provide full-band pipe markers, extending 360 degrees around pipe at each location.
C. On piping having external diameters of 6 inches and larger (including insulation, if any), provide either full-band or strip-type pipe markers but not narrower than three times letter height (and of required length), fastened by one of the following methods:
1. Laminated or bonded application of pipe marker to pipe or insulation.
2. Strapped-to-pipe or insulation application of semirigid type with Type 304 or 305 stainless steel bands.
3.02 INSTALLING VALVE AND EQUIPMENT LABELS
A. Attach labels to the valve or piece of equipment with Type 304 or 316 stainless steel chains or wires.
B. Attach valve labels to the valve handwheels. If the valve has no handwheel, attach the label to the valve by tying the tag wire or chain around the operating shaft or nut.
3.03 INSTALLING UNDERGROUND PLASTIC WARNING TAPE FOR PIPE During backfilling of each exterior underground piping system, install continuous underground-type plastic line marker, located directly over buried line at 6 to 8 inches above the top of the pipe. Where multiple small lines are buried in common trench and do not exceed overall width of 16 inches, install single line marker.
EQUIPMENT, PIPING, DUCT & VALVE IDENTIFICATION 400775-3 Main Lift Station Force Main B Air Release Valves Replacement Project
3.04 INSTALLING UNDERGROUND DETECTABLE METALLIC PIPE WARNING TAPE
Install tape 4 to 6 inches below finished ground surface, located directly over buried pipelines. Where multiple small pipelines are buried in a common trench and do not exceed an overall width of 16 inches, install a single marker tape.
END OF SECTION
EQUIPMENT, PIPING, DUCT & VALVE IDENTIFICATION 400775-4 Main Lift Station Force Main B Air Release Valves Replacement Project
THIS PAGE LEFT INTENTIONALLY BLANK
DUCTILE-IRON PIPE 402040-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 402040 DUCTILE-IRON PIPE
PART 1 - GENERAL
1.01 DESCRIPTION
This section describes materials, testing, and installation of ductile-iron pipe and fittings.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Fusion Bonded Epoxy Lining and Coatings: 099760
B. Cold-Applied Wax Tape Coating: 099772
C. Polyethylene Sheet Encasement (AWWA C105): 099754
D. General Piping Requirements: 400500.
E. Pressure Testing of Piping: 400515.
F. Manual and Process Valves: 40520.
1.03 SUBMITTALS
A. Submit shop drawings in accordance with the General Conditions and Section 013300.
B. Provide an affidavit of compliance with standards referenced in this specification, e.g., AWWA C151. Submit copy of report of pressure tests for qualifying the designs of all sizes and types of AWWA C153 fittings that are being used in the project. The pressure test shall demonstrate that the minimum safety factor described in AWWA C153, Section 5.5 is met.
C. Provide the following information:
1. Wall thickness.
2. Show deflections at push-on and mechanical joints.
3. Submit joint and fitting details and manufacturer’s data sheets.
D. Submit calculations and test data proving that the proposed restrained joint arrangement can transmit the required forces with a minimum safety factor of 1.5.
E. Submit certificate that cement for mortar lining complies with ASTM C150, designating type.
F. Submit test report on physical properties of rubber compound used in the gaskets.
DUCTILE-IRON PIPE 402040-2
Main Lift Station Force Main B Air Release Valves Replacement Project
G. Submit drawing or manufacturer's data sheet showing flange facing, including design of facing serrations.
H. Submit weld procedure specification, procedure qualification record, and welder's qualifications prior to any welding to ductile-iron pipe.
PART 2 - MATERIALS
2.01 PIPE
Pipe shall be cast ductile (nodular) iron, conforming to AWWA C151.
2.02 PIPE MARKING
Plainly mark each length of straight pipe and each fitting at the bell end to identify the design pressure class, the ductile-iron wall thickness, and the date of manufacture. Mark the spigot end of restrained joint pipe to show clearly the required depth of insertion into the bell.
2.03 PIPE WALL THICKNESS
A. Minimum wall thicknesses for pipe shall be as shown in the following table:
Pipe and Fitting Sizes
(inches) Wall Thickness*
12 and smaller Special Class 53
*Special Class and Pressure Class per AWWA C151.
B. Minimum wall thickness for pipe having threaded or mechanical joints or cast flange ends shall be Class 350, unless otherwise shown in the drawings.
C. Minimum wall thickness for pipe having threaded flanges shall be Special Class 53 or Pressure Class 350.
D. Minimum pipe wall thickness required for corporation stops and tapped outlets shall be in accordance with Table A.1 of AWWA C151 for three full threads for design pressures up to 250 psi and four full threads for design pressures over 250 to 350 psi.
2.04 FITTINGS
A. Fittings 48 inches and smaller shall conform to AWWA C110 with a minimum pressure rating of 250 psi. Material shall be ductile iron. Flanges shall be flat faced.
B. Grooved-end fittings shall conform to AWWA C110 with grooved ends conforming to AWWA C606, radius cut rigid joints. Fitting material shall conform to ASTM A48, Class 30; ASTM A126, Class B; or ASTM A536, Grade 65-42-10. Wall thickness of
DUCTILE-IRON PIPE 402040-3
Main Lift Station Force Main B Air Release Valves Replacement Project
ductile-iron (ASTM A536) fittings shall conform to AWWA C110 or C153; wall thickness of cast-iron fittings shall conform to AWWA C110. Fittings and couplings shall be furnished by the same manufacturer.
C. Material for fittings with welded-on bosses shall have a Charpy notch impact value of minimum 10 ft-lbs under the conditions defined in AWWA C151. Test completed welds by the liquid penetrant method per ASTM E165.
2.05 FLANGES
A. Flanges shall be solid back, Class 125 per AWWA C115. Flanges on pipe shall be either cast or threaded. Material shall be ductile iron.
B. Flanged pipe and fittings shall be shop fabricated, not field fabricated. Threaded flanges shall comply with AWWA C115. Flanges shall be individually fitted and machine tightened in the shop, then machined flat and perpendicular to the pipe barrel. Flanges shall be backfaced parallel to the face of flange. Prior to assembly of the flange onto the pipe, apply a thread compound to the threads to provide a leak-free connection. There shall be zero leakage through the threads at a hydrostatic test pressure of 250 psi without the use of the gasket.
2.06 PIPE LINING AND COATING
A. Line and coat pipe and fittings with Fusion Bonded Epoxy per Section 099761. In addition to epoxy coating and lining, tap wrap and bag underground DIP per Sections 099754 and 099772.
2.07 GASKETS FOR FLANGES
See Section 400500.
2.08 BOLTS AND NUTS FOR FLANGES
See Section 400500.
2.09 OUTLETS AND NOZZLES
A. Provide outlets 2 inches and smaller by tapping the pipe.
B. For outlets larger than 2 inches, use a tee with a flanged outlet.
2.10 JOINTS
A. Joints in aboveground or submerged piping or piping located in vaults and structures shall be grooved end or flanged.
DUCTILE-IRON PIPE 402040-4
Main Lift Station Force Main B Air Release Valves Replacement Project
2.11 DUCTILE-IRON PIPE WELDMENTS
A. All welding to ductile-iron pipe, such as for bosses, joint restraint, and joint bond cables, shall be done at the place of manufacture of the pipe. Perform welding by skilled welders experienced in the method and materials to be used. Welders shall be qualified under the standard qualification procedures of the ASME Boiler and Pressure Vessel Code, Section IX, Welding Qualifications.
B. Welds shall be of uniform composition, neat, smooth, full strength, and ductile.
Completely grind out porosity and cracks, trapped welding flux, and other defects in the welds in such a manner that will permit proper and complete repair by welding.
C. Completed welds shall be inspected at the place of manufacture by the liquid penetrant method. Conform to the requirements specified in ASTM E165, Method A, Type I or Type II. The materials used shall be water washable and nonflammable.
PART 3 - EXECUTION
3.01 DELIVERY, UNLOADING, AND TEMPORARY STORAGE OF PIPE AT SITE A. Use unloading and installation procedures that avoid cracking of the lining. If necessary, use plastic sheet bulkheads to close pipe ends and keep cement-mortar lining moist.
B. Deliver the pipe alongside the pipelaying access road over which the pipe trailer-tractors can travel under their own power. Place the pipe in the order in which it is to be installed and secure it from rolling.
C. Do not move pipe by inserting any devices or pieces of equipment into the pipe barrel.
Field repair linings damaged by unloading or installation procedures.
3.02 SANITATION OF PIPE INTERIOR
A. During laying operations, do not place tools, clothing, or other materials in the pipe.
B. When pipelaying is not in progress, close the ends of the installed pipe by a child- and vermin-proof plug.
3.03 INSTALLING FLANGED PIPE AND FITTINGS
Install in accordance with Section 400500. Cut the bore of the gaskets such that the gaskets do not protrude into the pipe when the flange bolts are tightened.
3.04 INSTALLING GROOVED-END PIPE AND FITTINGS
See Section 400500.
DUCTILE-IRON PIPE 402040-5
Main Lift Station Force Main B Air Release Valves Replacement Project
3.05 INSTALLING ABOVEGROUND OR EXPOSED PIPING
See Section 400500.
3.06 PAINTING AND COATING
A. Line and coat pipe per Section 099761. Paint exposed piping per Section 099000 similar color to to adjacent equipment. Engineer and Owner to approve final top coat color.
B. Line, coat, and paint exposed couplings the same as the pipe exterior coating. Engineer and Owner to approve final top coat color.
3.07 POLYETHYLENE ENCASEMENT OF BURIED PIPE AND FITTINGS Wrap buried pipe, fittings, grooved-end couplings, and joints with polyethylene.
3.08 FIELD HYDROSTATIC TESTING
Test pressures are shown in Section 400515. Test in accordance with Section 400515.
END OF SECTION
DUCTILE-IRON PIPE 402040-6
Main Lift Station Force Main B Air Release Valves Replacement Project
THIS PAGE LEFT INTENTIONALLY BLANK
STAINLESS STEEL PIPE 402076-1
Main Lift Station Force Main B Air Release Valves Replacement Project
SECTION 402076 STAINLESS STEEL PIPE
PART 1 - GENERAL
1.01 DESCRIPTION
This section includes materials and installation of stainless steel pipe and fittings 4 inches in diameter and smaller conforming to ASTM A312 or A778 and having a maximum design pressure of 150 psi.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. General Piping Requirements: 400500.
B. Pressure Testing of Piping: 400515.
C. Manual Process Valves: 400520.
D. Valve and Piping Identification: 400775.
1.03 SUBMITTALS
Submit shop drawings in accordance with Section 013300.
PART 2 - MATERIALS
2.01 PIPE
A. Pipe smaller than 3 inches shall conform to ASTM A312, Grade TP 316L.
B. Pipe sizes and wall thicknesses shall conform to ASME B36.19 as follows:
Pipe Size Wall Thickness
1 inch and smaller Schedule 80S
1 1/4 inches through 3 inches Schedule 80S
2.02 FITTINGS
A. Fittings 3 inches and smaller shall be threaded, conforming to ASME B16.11, 3,000- pound CWP. Material for threaded fittings shall conform to ASTM A403, Class W 316 or ASTM A182, Grade F316.
STAINLESS STEEL PIPE 402076-2
Main Lift Station Force Main B Air Release Valves Replacement Project
2.03 PICKLING, PASSIVATING, AND FINAL CLEANING
Pipe and fittings shall be final cleaned, pickled, and passivated per ASTM A380.
Passivation shall be the removal of exogenous (not inherent in the base metal) iron or iron compounds from the surface of the stainless steel by means of a chemical dissolution, by a treatment with an acid solution that will completely remove the surface contamination but will not significantly affect the stainless steel itself. After final cleaning, wet surfaces with water and inspect for rust spots after 24 hours. Reclean if there is any evidence of rusting.
2.04 QUALITY CONTROL
Include the "Hydrostatic Test" and "Flattening Test" requirements described in ASTM A999. A nondestructive electric test per ASTM A999 may be substituted for the hydrostatic test.
2.05 UNIONS
Unions shall be 3,000-pound WOG forged stainless steel, with dimensions conforming to MSS SP-83. Ends shall be threaded per ASME B1.20.1. Material shall conform to ASTM A182, F316 for threaded end unions.
2.06 JOINTS
A. Joints for pipes 3 inches and smaller shall be threaded or flanged as shown in the plans, same material as specified for fittings, 3,000-pound WOG, conforming to ASME B16.11.
B. See Section 400500 for additional requirements.
2.07 OUTLETS AND NOZZLES
A. Outlets of size 3 inches and smaller in piping 4 inches and larger shall be of the Thredolet type, per MSS SP-97 and AWWA Manual M11 (1989 edition), Figure 13-23.
Outlets shall be 3,000-pound WOG stainless steel per ASTM A182, Grade F316L or ASTM A403, Grade WP316L. Threads shall comply with ASME B1.20.1. Outlets shall be Bonney Forge Co. "Thredolet," Allied Piping Products Co. "Branchlet," or equal.
2.08 THREAD LUBRICANT
Use Teflon thread lubricating compound or Teflon tape.
2.09 FLANGES
A. Provide weld-neck flanges (conforming to ASME B16.5) for piping 3 inches and smaller to connect to flanged valves, fittings, or equipment as shown in plans. Provide weld- neck or Van Stone flanges (per ASTM F2015) for piping larger than 3 inches. Flanges
STAINLESS STEEL PIPE 402076-3
Main Lift Station Force Main B Air Release Valves Replacement Project
shall be Class 150 per ASME B16.5. Flanges shall match the connecting flanges on the adjacent fitting, valve, or piece of equipment. Flanges shall be flat face.
B. Material for weld-neck flanges shall conform to ASTM A182, Grade F316L.
C. Material for Van Stone flanges shall be stainless steel, ASTM A351, Grade CF8M:
2.10 BOLTS AND NUTS FOR FLANGES
See Section 400500.
2.11 LUBRICANT FOR STAINLESS STEEL BOLTS AND NUTS
See Section 400500.
2.12 GASKETS FOR FLANGES
See Section 400500.
2.13 PROTECTIVE END CAPS
Provide protective end caps on each piece of pipe or fabricated section, completely sealing the piece from contamination during shipment and storage. Provide the same type of seals on each fitting, or ship and store fittings in sealed boxes or containers.
2.14 OXYGEN INDICATOR FOR WELDING OPERATIONS
Use an oxygen indicator to determine the oxygen level in the purged atmosphere (rest oxygen) in the welding area. The oxygen indicator shall be of the zirconium cell type having a range of 1- to 100-ppm oxygen. Products: Intercon Enterprises Pro-2 or equal.
PART 3 - EXECUTION
3.01 SHIPPING, STORAGE, AND HANDLING
A. Ship, store, and handle piping (including both pipe and fittings) per AWWA C220, Section 6.2 and AWWA C226, Section 6.3 and the following.
B. When loading piping for shipment to the project site, use spacers and other protective devices to separate pipes to prevent damaging the surfaces during transit and unloading.
If wood spacers are used, remove wood splinters and particles from the pipe surfaces after separation. Use padded chains or ribbon binders to secure the loaded pipe and minimize damage.
C. Cover piping 100% with protective coverings or tarpaulins to prevent deposition of road salts, fuel residue, and other contaminants in transit.
STAINLESS STEEL PIPE 402076-4
Main Lift Station Force Main B Air Release Valves Replacement Project
D. Provide stulls, braces, and supports during shipping and storage such that out-of- roundness or deflection does not exceed 0.5% of the pipe diameter.
E. Handle piping with care during unloading, installation, and erection operations to minimize damage. Do not place or store pipe on the ground or on top of other work unless ground or work is covered with a protective covering or tarpaulin. Place pipe above the ground upon platforms, skids, or other supports.
F. Store piping at the site on pallets to prevent direct contact with ground or floor. Cover pipe during storage with protective coverings or tarpaulins to prevent deposition of rainwater, salt air, dirt, dust, and other contaminants.
G. Do not allow piping to contact carbon steel surfaces during storage, handling, or installation and erection at the site.
3.02 FABRICATION, ASSEMBLY, AND ERECTION
A. See Section 402001. Use an inert or shielding gas welding method. Do not use oxygen fuel welding. Purge the interior of the pipe with inert gas prior to the root pass. The oxygen content in the purged atmosphere in the welded area shall not exceed 30 ppm during welding operations. Use an oxygen indicator to verify oxygen levels during welding. Provide written documentation of the welding procedure before and during the oxygen purging process, showing the oxygen levels attained during the purging and welding operations.
B. Welded butt joints (both longitudinal and circumferential) shall comply with AWWA C220 and AWWA C226, Section 4. Do not use backing rings. Provide full penetration and smooth internal diameters for the root bead of welds. Grind the inside weld of socket welds flush with the pipe internal diameter. Welds shall be of smooth finish. Use anti- spatter compounds specifically formulated or designed for use with stainless steel. Do not allow heat tint to form in the heat-affected zone or remove heat tint completely from the heat-affected zone of the finished weld. The maximum depth of grinding or abrasive blasting to remove defects shall not exceed 10% of the wall thickness. Do not perform abrasive blasting with steel shot, grit, or sand.
C. No iron or steel surfaces shall come into contact with the stainless steel. This includes placing on steel tables, racks, pipe supports, etc. Do not use carbon steel wire brushes or grinders.
D. Welding electrodes shall comply with AWS A5.4. Bare wire shall comply with AWS A5.9. Use electrodes as follows:
STAINLESS STEEL PIPE 402076-5
Main Lift Station Force Main B Air Release Valves Replacement Project
Pipe Material Welding Electrode Material
Type 304 E 308
Type 304L E 347
Type 316 E 316
Type 316L E 318
3.03 INSTALLING THREADED PIPING
Ream, clean, and remove burrs from threaded piping before making up joints. Apply thread lubricant to threaded ends before installing fittings, couplings, unions, or joints.
3.04 INSTALLING FLANGED PIPING
See Section 400500.
3.05 INSTALLATION OF STAINLESS STEEL BOLTS AND NUTS
See Section 400500.
3.06 INSTALLING UNIONS
Provide unions on exposed piping 3 inches and smaller as follows:
A. At every change in direction (horizontal and vertical).
B. 6 to 12 inches downstream of valves.
C. Where shown in the drawings.
3.07 INSTALLING ABOVEGROUND OR EXPOSED PIPING
See Section 400500.
3.08 INSTALLING BURIED PIPING
Install in accordance with Section 312300.
3.09 FIELD HYDROSTATIC TESTING
A. See Section 400515.
B. Do not allow test water to remain in the pipe for more than five days. Drain and dry the piping after completing the testing.
3.10 PAINTING AND COATING
A. Do not coat stainless steel Van Stone flanges.
STAINLESS STEEL PIPE 402076-6
Main Lift Station Force Main B Air Release Valves Replacement Project
3.11 INSTALLING WRAPPED OR COATED PIPE
Install buried pipes having wrapped coatings by extending the wrapping to the first joint after entering a building, penetrating a slab, or 6 inches above finished grade. Wrap joints spirally with a minimum overlap of 50% of the tape width.
END OF SECTION
CITY OF MILPITAS TRUCK ROUTE MAP
SPECIAL EQUIPMENT PLATE
City of Milpitas
455 E. Calaveras Blvd.
Milpitas, California 95035
Date
Contractor
Address
Subject: Project #, name
NOTICE OF INTENT TO AWARD
Dear Mr. _______:
The Milpitas City Council, at its meeting of __________, is scheduled to award the subject project to your company. Enclosed are the following documents, which require the signature of representatives of your company:
1 Contract 2 copies
2. Faithful Performance Bond 2 copies
3. Payment Bond 2 copies
4. Data Sheet: Regarding Bonding Co. 1 copy
5. Certificate of Insurance 1 copy
6. Data Sheet: Regarding Insurance Co. 1 copy
7. 1 copy
8. 1 copy
9. 1 copy
10. City Business License 1 copy
11. Taxpayer Identification Number and Certification 1 copy
12. Apprenticeship Standards 1 copy
13. Urban Runoff Prevention, BMP, SWPPP Acknowledgement 1 copy
Please refer to the project specifications regarding the time limit for execution of the contract with the City. Your attention is also directed to Specification Special Conditions and elsewhere within the Contract Documents regarding the start of the first chargeable day, and other items to be completed by the contractor prior to receiving a notice-to-proceed.
Please return the signed construction contract, bonding and insurance documents to my attention by _________ (to facilitate a timely completion). In addition, please submit a construction schedule, SWPPP, traffic control plan including staging and haul route, concrete mix design, R-bar, notices, Conditions for additional items) for review by ______________. Please contact me at (408) 586- ____ to schedule a pre-construction conference. Your attention is directed to Specification Special Superintendent at the pre-construction conference. Please be advised that no work may proceed until the contract documents have been fully executed and your copy of the notice to proceed is issued to you.
Sincerely,
______________
Project Engineer
Enclosure
City of Milpitas
455 E. Calaveras Blvd.
Milpitas, California 95035
Date
Contractor
Subject: Project #, name
Notice of Award
Dear _____________ ____:
The Milpitas City Council, at its meeting of ___________, has awarded the subject project to your company. The contract document forms (including the bonds, insurances, business license, and other related documents) had been previously sent to you via the notice of intent to award.
Please refer to the project specifications regarding the time limit for execution of the contract with the City. Your attention is also directed to Specification Special Conditions and elsewhere within the Contract Documents regarding the start of the first chargeable day, and other items to be completed by the contractor prior to receiving a notice-to-proceed.
Please return the signed construction contract, bonding and insurance documents to my attention by _____________ (to facilitate a timely completion). In addition, please submit a construction schedule, SWPPP, traffic control plan including staging and haul route, concrete mix design, R- the Special Conditions for additional items) for review by _______________. Please contact me at (408) 586-3___ to schedule a pre-construction conference. Your attention is directed to the Superintendent at the pre-construction conference. Please be advised that no work may proceed until the contract documents have been fully executed and your copy of the notice to proceed is issued to you.
Sincerely,
________________
Project Engineer
NOTICE TO PROCEED
Date: _____________________
TO: _____________________________________________
ADDRESS: _______________________________________
PROJECT: ________________________________________
You are notified that the Contract Time under the above contract will commence to run on _____________________. By that date, you are to start performing your obligations under the Contract Documents. In accordance with Section D, the date of final completion is _____________________.
Before you may start any Work at the site, you must: (conditions if applicable)
________________________________________________________________________
________________________________________________________________________
CITY OF MILPITAS,
A Municipal Corporation
By :
Title:
SUBMITTAL COVER SHEET
SUBMITTAL NO. : DATE SUBMITTED:
PROJECT:__________________________________ PROJECT #:
FROM: GENERAL CONTRACTOR TO: CITY OF MILPITAS
ENGINEERING DIVISION
455 E. CALAVERAS BLVD.
MILPITAS, CA 95035
Phone #: Attn.__________________
Specification Check If Substitution
Item Section/Plan Sheet Submittal Description or Exception Comment / Date Required
1 2
3 4
_______________________________________________________________________________ I certify that this submittal is in conformance with the requirements of the Contract Documents and is not in conflict with other submittals. Any proposed submittal substitution or exception is fully indicated within the submittal, and the proposed substitution or exception is in compliance with the Contract Documents. __________________________________
General Contractors Signature
DESIGN CONSULTANT RESPONSE: Date Received:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Reviewer: ____ Date Transmitted to City: _____________________________
CITY RESPONSE: Date Received: _____
NO EXCEPTIONS NOTED The City does not find any exceptions to the submittal, relying solely upon information provided onal
partial submittals for portions of the work not covered in this submittal. Does not constitute acceptance or deletion of specified or required items not shown in a partial submittal.
MAKE CORRECTIONS NOTED The same as above, except that minor corrections as noted by the Engineer shall be made by the Contractor. No resubmittal is required.
REVISE AND RESUBMIT Rejected due to noncompliance with the requirements of the project plans and Specifications because of major inconsistencies or errors which shall be resolved or corrected by the Contractor prior to subsequent review by the Engineer.
SUBMIT SPECIFIED ITEM Submittal is rejected because the submitted material does not conform to the requirements of the project plans and specifications in major respects. This material is not to be resubmitted, and it is expected that the material specified in the project plans and specifications be submitted.
City Reviewer: Date:
REQUEST FOR INFORMATION
RFI #: __________ DATE CREATED:
PROJECT:_________________________________ PROJECT #:
FROM: GENERAL CONTRACTOR TO: CITY OF MILPITAS
ENGINEERING DIVISION
455 E. CALAVERAS BLVD.
MILPITAS, CA 95035
Phone #: ATTN.:
Subject:
INFORMATION REQUESTED: Date Required:
Specification/Plan Sheet Reference:
I certify that this is not a frivolous Request For Information and that I have completely reviewed all project Contract Documents and to the best of my professional judgment have determined that the information requested is not obvious or found.
______________________________________
General Contractor Signature
________________________________________________________________________________
DESIGN CONSULTANT RESPONSE: Date RFI Received:
Response by Date Answered
______________________________________________________________________________
CITY RESPONSE: Date RFI Received:
Response by Date Answered:
NOTICE OF NON-COMPLIANCE
Date & Time Issued:
To: _______________________
_______________________
_______________________
Project: _________________________________ Project Number: _______
In accordance with General Conditions of the Project Specifications, you are hereby notified that the following work is defective and does not comply with the requirements of the Project Contract Documents: __________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ Work found to be defective or not in compliance with the Contract Documents shall not be paid for by the City, and it shall be the Contractor's responsibility to remove and replace the defective Work at no additional cost to the City. The Contractor shall determine what corrective action is necessary to bring the Work into compliance, and shall notify the Engineer prior to starting corrective action.
City Project Manager:
City Inspector:
Notice of Non-Compliance was received by: / /
FIELD MEMORANDUM
Date: _______________________ Page 1 of
To: _______________________
From: _______________________
Project: _____________________________________________________________ Subject: _____________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ Disclaimer:
All work shall be done in accordance with the Contract Documents. The written direction above provides clarification only. The Contractor acknowledges that any additional cost shall be authorized in advance in a fully executed Contract Change Order.
_______________________________
Signature
CC:
Project Punchlist
Project:_________________________
Contractor:______________________
Punchlist Acknowledged:__________
Project Eng.:___________________ Inspector:____________________ Date:_____________ Item Date Item
Entered
Description Item
Completed
Date Initial
Part A Standing Items
1 The contractor shall submit a full set of As-built /Record Drawings showing the subcontractors-paving, striping, loops on the title sheet.
2 Submit written warranties in accordance with the Specifications:
appendix sample-page 151. If not applicable check here.
3 Operation/Maintenance Manuals have been received in full numbers specified.
If not applicable check here.
4 Deliverables (i.e. special tools or spare parts) have been received as specified.
If not applicable check here.
5 Training has been performed as specified.
If not applicable check here.
6 Verify that all Building Permits have been signed off.
If not applicable check here.
7 Verify Certificate of Monumentation has been received.
If not applicable check here.
8 Ordinance 238 (Landscape/Sprinkler has been completed).
If not applicable check here.
9 Verify that Planning Department Conditions have been met.
If not applicable check here.
10 Compliance with Special Conditions
If not applicable check here.
11 Compliance with Reclaimed Water Requirements
If not applicable check here.
12 Submit lien releases from all subcontractors and suppliers. 13 Submit complete certified payroll.
Part B Project Specific Items
14 Construction Water Meter(s) returned.
ESCROW AGREEMENT
SECURITY DEPOSITS IN LIEU OF RETENTION
This Escrow Agreement is made and entered into effective (date) ___________by and between City of Milpitas whose address is 455 E Calaveras Blvd. Milpitas, CA 95035-5479 after set forth, the Owner,
Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for _____________ in the amount of Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of Owner and shall designate the Contractor as the beneficial owner.
(2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.
(3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
(4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent.
(5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner.
(6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor.
(7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days written notice to the Escrow Agent from the owner of the
default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
(9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant in Sections (5) to (8), inclusive, of this Agreement and the Owner and of
the securities and interest as set forth above.
(10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of the Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:
On behalf of Owner: On behalf of Contractor:
City Manager
Title Title
Name Name
Signature Signature
Address Address
On behalf of Escrow Agent:
Title
Name
Signature
Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.
Owner Contractor
Title Title
Name Name
Signature Signature
COST PROPOSAL FORM (See General Conditions, Contract Change Orders)
Date: ________________ Project Number
______________
In Response To ___________________ (RFP #, etc.)
To: City of Milpitas
455 East Calaveras Boulevard
Milpitas, CA 95035
Brief description of change(s):
ITEM DESCRIPTION PRIME
CONTR.
SUB 1
SUB 2
SUB 3
TOTAL
Material
Direct Labor Cost
Equipment
Other (Specify) Extended
Overhead
Total Cost
Profit (15% max)
Profit on Labor & Materials (15%
max)
Profit on Equipment (10% max)
Mark-
work (5% max)
Bonds
(% of total cost above not
including any O/P)
GRAND TOTAL
REQUESTED CHANGE IN CONTRACT TIME (DAYS)
By: _________________________________ (Firm Name)
Signature: ___________________________ Date: ________________
Title: _______________________________
City of Milpitas
455 E. Calveras Boulevard
Milpitas, California 93035
CHANGE ORDER FORM
CONTRACT CHANGE ORDER NO. __
Date: [INSERT]
To: [CONTRACTOR NAME]
[ADDRESS]
[ADDRESS]
Attn: [CONTRACTOR REP]
Project: [INSERT]
This Change Order covers changes to the contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for the amount agreed upon between the Contractor and City of Milpitas and set forth herein.
Item
No. Description of Changes
Increase/
(Decrease)
in Contract
Amount
Contract
Time
Extension,
Days
1 2
Totals $
Original Contract Amount: $XX.00
Change by Previous Change Order(s): $XX.00
Contract Price Prior to this Change Order: $XX.00
Current Change Order Amount: $XX.00
Revised Contract Amount including this Change Order: $XX.00
The Contract Price and Contract Time shall be adjusted as set forth above. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City.
Contractor accepts the terms and conditions stated above as full and final settlement of any and all claims arising out of or related to the subject of this Change Order and acknowledges that the compensation (time and cost) set forth herein comprises the total compensation due for the work or change defined in the Change Order, including all impact on any unchanged work. By signing this Change Order, the Contractor acknowledges and agrees that the stipulated compensation includes payment for all Work contained in the Change Order, plus all payment for any acceleration or interruption of schedules, extended overhead costs, delay, and all impact or cumulative impact on all Work under this Contract. The signing of this Change Order acknowledges full mutual accord and satisfaction for the change and that the stated time and/or cost constitute the total equitable adjustment owed the Contractor as a result of the change. The Contractor hereby releases and agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim or request for equitable adjustment of any type, for any reasonably foreseeable cause that shall arise out of, or as a result of, this Change Order and/or its impact on the remainder of the Work under the Contract.
Accepted:
Date
Recommended:
(Signature) [**INSERT NAME, TITLE**] Date
Approved:
(Signature) [**INSERT NAME, TITLE**] Date
This Contract Change Order consists of 2 pages and any exhibits attached to this Contract Change Order shall not be part of the Contract Change Order unless specifically initialed by or on behalf of both the Contractor and the City of Milpitas.
Contract Change Order #
WEEKLY STATEMENT OF DAYS CHARGED TO CONTRACT
City of Milpitas
Engineering Division
Date:___________
Project:____________________________________________________Project No. ___________
Weekly Statement No. :___________
Notice of Project Award Issued:____________, Notice To Proceed Issued: ____________
The following statement shows the number of ____________________ days charged to the contract
(Calendar or Working)
for the week ending: _____________.
1. First chargeable day of the Contract: ___________________
2. Number of Days in the Contract: ___________________
3. Contractual completion date: ___________________
( = #1 + #2)
4. Days added by Contract Change Order: ___________________
5. Days not charged to Contract (note reason below): ___________________
6. Revised completion date based on #4 and/or #5: ___________________ ( = #3 + #4 + #5)
Total number of Days charged to the Contract as of this Statement:___________________
Total number of Days remaining as of this Statement: ___________________
Notes:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ________________________
_________________________ __________________________ City Project Manager City Inspector
Refer to Special Conditions of the Contract Documents. The Contractor has fifteen (15) days to submit written protest of this Statement to the Engineer; otherwise, this Statement shall be deemed to have been accepted by the Contractor.
Accepted By: _____________________________________
Contractors Signature
SAMPLE PROGRESS PAYMENT FORM
Refer to the Special Conditions regarding requirements for requesting Progress Payments.
GUARANTY / WARRANTY
TO: CITY OF MILPITAS, for the (project name), Project (#), in Milpitas, CA.
The undersigned guarantees all construction performed on this project and also guarantees all material and equipment incorporated therein Contractor hereby grants to Owner for a period of one (1) year following the date of acceptance of the Work by the City of Milpitas or such longer period specified in the Contract Documents, its unconditional warranty of the quality and adequacy of all of the Work including, without limitation, all labor, materials and equipment provided by Contractor and its Subcontractors of all tiers in connection with the Work.
Neither final payment nor use or occupancy of the Work performed by the Contractor shall constitute an acceptance of work not done in accordance with this Guaranty or relieve Contractor of liability with respect to any express warranties or responsibilities for faulty materials or workmanship. Contractor shall remedy any defects in the Work and pay for any damage resulting there from which shall appear within one (1) year, or longer if specified, from the date of acceptance as described above.
Should any of the materials or equipment prove defective or should the Work as a whole prove defective, due to faulty workmanship, material furnished or methods or installation, or should the Work or any part thereof fail to operate properly as originally intended and in accordance with the Contract Documents due to any of the above causes within one (1) year after date of acceptance, or such longer period specified in the Contract Documents, Contractor shall: (1) reimburse Owner, upon demand, for its expenses incurred in restoring said Work to the condition contemplated in the Contract Documents, including the cost of any such equipment or materials replaced and the cost of removing and replacing any other work necessary to make such replacement or repairs, or (2) upon demand by Owner, replace any such material and to immediately repair said Work completely without cost to Owner so that said Work will function successfully as originally contemplated.
Inspection of the work shall not relieve Contractor of any of its obligations under the Contract Documents. Even though equipment, materials, or work required to be provided under the Contract Documents have been inspected, accepted, and estimated for payment, Contractor shall, at its own expense, replace or repair any such equipment, material, or work found to be defective or otherwise not to comply with the requirements of the Contract Documents up to the end of the guaranty period.
Owner shall have the unqualified option to make any needed replacement or repairs itself or to have such replacements or repairs done by Contractor. In the event Owner elects to have said work performed by Contractor, Contractor shall make such repairs within a reasonable period of time after the receipt of demand from Owner; provided, however, that in no event shall such period exceed twenty-five (25) days.
All definition of terms used in this Agreement shall have the meanings set forth in the Project Specifications, Special Conditions, Definitions of Words and Terms.
The foregoing Guaranty is in addition to any other warranties by Contractor contained in the Contract Documents, and not in lieu of, any and all other liability imposed on Contractor under es, obligations, and
performance under the Contract Documents. In the event of any conflict or inconsistency between the terms of this Guaranty and any warranty or obligation of the Contractor under the Contract Documents or by law, such inconsistency or conflict shall be resolved in favor of the higher level of obligation of the Contractor.
CONTRACTOR:
Corporate
Seal:
Name of Firm
Signature Date
Title
___________________________________________
Signature Date
Title
CONSTRUCTION CHANGE DIRECTIVE NO:___
City of Milpitas
Engineering Division
Project Name Project No: ______________ PAGE 1 of
TO:_________________________________
FROM: ___________ DATE: _____________________
SUBJECT/ITEM:
____________________________________________________________________________
DESCRIPTION:
References:
Attachments:
CONSTRUCTION CHANGE DIRECTIVE INSTRUCTIONS:
The Contractor is directed to proceed with the above-described work without change in contract price.
The Contractor is directed to proceed with the above-described work and submit within the next 14 calendar days an itemized lump sum price and requested time extension, if any, to facilitate the review and settlement of this CCD in accordance with the Contract Documents. The cost of the work covered by this directive shall not exceed $. In the event that the cost of this work is anticipated to exceed the amount above, the Contractor will notify the City/Agency in writing and obtain additional authorization before proceeding.
The Contractor is directed to proceed with the above-described work on a time and material basis with a Not-To-Exceed Amount of $0.
Itemized time and material documentation shall be provided on a daily basis in accordance with the Contract Documents.
The Contractor shall be paid at bid item prices for the work performed.
The Contractor is directed to provide pricing for the above-described work within the next 7 calendar days. The Contractor shall not proceed with the work until authorized by written Contract Change Order.
AUTHORIZED BY: ACKNOWLEGEMENT OF RECEIPT:
City of Milpitas
OWNER CONTRACTOR:
BY: BY:
_______________________________________________________________________________________________________________________________________________________
SIGNED DATED SIGNED DATED
RIGHT OF ENTRY
CITY OF MILPITAS
ENGINEERING DIVISION
BID SUMMARY
Project Name: Main Lift Station Forcemain-B Air Release Valves Replacement Project No. : 6124
Bid Date: 4/23/2026
Apparent Low Bidder
Casey Construction GSW Construction, Inc. Corcus Construction ITEM DESCRIPTION Qty. UNIT Item Total Item Total Item Total 1 Mobilization & Demobilization 1 LS 20,000.00$ $6,000.00 $25,760.00 $23,000.00 2 Erosion and Sediment Control Plan 1 LS 10,000.00$ $6,000.00 $1,750.00 $4,500.00 3 Demolish Existing Facilities and Salvage Equipment 1 LS 15,000.00$ $20,000.00 $25,400.00 $21,500.00 4 Install ARVs No. 2, 3, 4, 5, and 7 Complete 1 LS 305,000.00$ $250,000.00 $260,000.00 $395,000.00 5 Install ARV No. 1 and 6 Complete 1 LS 45,000.00$ $25,000.00 $54,600.00 $98,000.00 6 Install ARV No. 6A Complete 1 LS 5,000.00$ $26,000.00 $5,370.00 $16,500.00 $400,000.00 $333,000.00 $372,880.00 $558,500.00
List of Sub-Contractors:
Casey Construction GSW Construction, Inc. Corcus Construction Redwood Painting Co.Coating
Description
Engineer's
Estimate
BASE CONTRACT WORK
Attachment D
NOTICE OF INTENT TO AWARD CONTRACT
Department of Public Works
Project Name: Forcemain-B Air Release Valves Replacement Project City Project Number: 6124
Bid Opening Date: April 23, 2026 (2:00 PM)
NOIA Posting Date: April 24, 2026
Project Manager: Adrianne Nikoloff
NOIA Posting Location: Addenda & Official Notices
On April 23, 2026, the City of Milpitas (City) held a bid opening for the upcoming Main Lift Station Forcemain-B Air Release Valves Replacement Project. The City intends to award the Project contract to the lowest responsive bidder, Casey Construction, Inc., at the May 19th, 2026, City Council Meeting.
As per Milpitas Municipal Code (MMC) MMC 1-2-3.19 - Protest Procedure, Any interested party may file a protest to a proposed award of a contract in an amount over Ten Thousand Dollars ($10,000). The protest shall be filed with the Purchasing Agent in writing no later than seven (7) calendar days after the posting of the Notice of Intent to award and shall set forth the basis for the protest and any proposed remedy.
All protests shall be in writing and shall contain a complete statement of the legal grounds for the protest; all the facts relevant to the protest; and the form of relief requested and the legal basis for such relief. All protests shall be accompanied by all documentation supporting the grounds for the protest. The protest shall include the name, address and telephone number of the protesting party and the person representing the protesting party, if any.
Protests may be submitted only by a party that has submitted a bid or proposal in response to the contract solicitation. A subcontractor of a bidder or proposer may not submit a protest. A party may not rely on a protest submitted by another party but must timely pursue its own protest.
Protests can only be submitted by the party that submitted the bid by one of the following methods:
Via mail or hand delivered, Monday thru Friday, between 8:00 a.m. and 5:00 p.m. to:
Attn: Luz Cofresi-Howe,
Finance Director
455 E. Calaveras Blvd,
Milpitas, CA 95035
OR, via e-mail @ [email protected]
Attachment e
Construction Change Order Policy for the Main Lift Station Forcemain-B Air Release Valves Replacement Project, CIP No. 6124
2021 City Council Approved Construction Change Order Policy
Construction Award Individual Administrative Cumulative Award Amount Change Order Authority Change Order Authority Less than $100,000 $10,000 $15,000
Over $100,000 10% of Award or $20,000 15% of Award or $40,000 whichever is less whichever is smaller
Main Lift Station Forcemain-B Air Release Valves Replacement Project, CIP No. 6124 Change Order Policy
Construction Award Individual Administrative Cumulative Award Amount Change Order Authority Change Order Authority $333,000 N/A $67,000
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Authorize the City Manager, or Designee, to Negotiate and Execute Agreements with Life Extension Clinics, Inc. for Annual Physical Exams and Related Services and with Emergency Physicians Associates San Jose PC for Medical Advisor for Emergency Medical Services (Staff Contact: Luz Cofresí-Howe, Finance Director, 408-586-3111; and Jason Schoonover, Fire Chief, 408-586- 2811)
Category: Consent Calendar-Public Safety
Meeting Date: 5/19/2026
Recommendation: Authorize the City Manager, or designee, to negotiate and execute (1) a Professional Services Agreement with Life Extension Clinics, Inc. for annual physical examinations and related services with a maximum compensation of $400,000; and (2) a Professional Services Agreement with Emergency Physicians Associates San José PC for emergency medical advisor services with a maximum compensation of $108,838, both of which are for a five-year term and subject to the appropriation of funds.
BACKGROUND:
The City’s Fire Department utilizes medical services from third-party providers for uniformed Fire Department personnel annual physical examinations and medical advisory services to oversee the City’s Emergency Medical Services (EMS) program.
Annual Physical Examinations:
The Fire Department’s uniformed fire personnel provide critical fire, medical, rescue, and life safety services and respond to approximately 6,500 calls for service annually. Fire Department personnel are frequently exposed to high-stress environments and physical exertion. In addition to emergency response, Department personnel ensure community safety by inspecting high-risk facilities and enforcing compliance with the California Fire Code and Hazardous Materials Program.
These duties have a direct impact on staff’s long-term health. The City prioritizes the physical and mental well- being of its uniformed personnel. In accordance with the Wellness-Fitness Initiative established by the International Association of Fire Fighters and the International Association of Fire Chiefs, as well as the National Fire Protection Association 1580 Standard for Emergency Responder Occupational Health and Wellness, the City contracts with a qualified medical provider to conduct standardized annual physical examinations for uniformed Fire personnel. This firefighter occupational exam includes additional testing that would not otherwise be included in a routine annual medical physical that is offered through private insurance carriers and includes conducting a comprehensive assessment designed to ensure a firefighter is fit for the high-intensity, hazardous nature of the job. Additionally, these comprehensive firefighter exams are significantly more rigorous than a routine medical exam and focus on cardiovascular health, respiratory function, and cancer screening, as firefighters face significantly higher risks of cancer than the general public.
These evaluations are voluntary and designed to support physical fitness, early detection, and reduce job- related injuries and fatalities by providing essential wellness metrics while maintaining individual confidentiality.
The City’s current provider for these services is Kaiser Permanente whose agreement expires June 30, 2026.
Medical Advisory Services:
The Fire Department provides emergency services to the community under the auspices of the Emergency Medical Services Agency of the County of Santa Clara (County) by contractual agreement as a local participating agency. The County sets the policies, protocols and plans, and requires the City to designate a
qualified Medical Advisor to provide prescriptive authority and medication control as required by law and assist in clinical assurance and continuous quality management activities of the City’s EMS program.
Prior to 2017, the City had a physician on staff who assumed these responsibilities. After his retirement in 2017, the City contracted with Stanford Healthcare to provide an emergency medical physician for these services. The current agreement for these services expires June 30, 2026.
ANALYSIS:
On November 17, 2025, the City released a Request for Proposal RFP (RFP) 25-1100 for Medical Services for the Fire Department. The RFP comprised two packages, and firms could submit proposals for one or both:
• Package A: Annual Physical Exams and Related Services • Package B: Medical Advisor for Emergency Medical Services
The scope of services for Package A included fire service specific medical assessments, including baseline medical evaluations, consolidated medical assessments, immunizations (as needed), data record-keeping services, and electronic data reporting. In the scope, the City specified that physical examinations be completed onsite at Fire Station 1 from January-March annually, minimizing the need for City personnel to travel offsite.
For Package B, the scope of services required a qualified physician to serve as a Medical Advisor for the City’s EMS program. Responsibilities include providing prescriptive authority and oversight, protocol review and approval, case reviews, quality improvement activities, curriculum development, and training and consultation on staff performance.
The RFP was publicly noticed on the City’s website and OpenGov, the City e-procurement website, in accordance with the City Municipal Code. Upon release, 7,080 firms received notification of the RFP, and 36 firms downloaded the RFP. Five vendors submitted proposal responses for Package A and two vendors submitted proposal responses for Package B by the published RFP closing date of January 14, 2026. One proposer for Package B was subsequently disqualified for being non-responsive to the RFP requirements.
Package A: Annual Physical Exams and Related Services
Proposals for Package A were evaluated and scored in accordance with the evaluation criteria set forth in the RFP. Final proposal scores are as follows:
Evaluation Criteria
Evaluation
Criteria
Weight (%)
Bio-Care
USA, Inc.
Instant
Urgent Care
Life
Extension
Clinics, Inc.
Pinnacle
Training
Systems
Professional
Health
Services, Inc.
Cover Letter and RFP Compliance 10.0% 3.7 4.0 9.3 9.3 4.0 Company Profile 5.0% 3.1 2.0 4.9 4.6 1.9
Execution Plan/Project Approach 30.0% 13.0 10.0 28.0 26.0 12.0 Personnel & Staffing 10.0% 4.7 4.7 9.0 9.7 4.0
References 5.0% 2.0 2.0 5.0 4.9 2.2
Proposed Compensation 40.0% 40.0 4.0 32.0 28.0 28.0
Weighted Average Score 100.0% 66.5 26.7 88.2 82.5 52.1
Based on these results, Life Extension Clinics, Inc. was the best value proposer in accordance with the evaluation criteria set forth in this RFP. Staff conducted customer reference checks with the City of Sacramento, the City of Modesto, and the County of Ventura. All references provided positive feedback. Upon City Council approval, staff will negotiate and execute an agreement with Life Extension Clinics, Inc. for an amount not to exceed $400,000 for the five-year term substantially in accordance with the City’s standard terms and conditions.
Package B: Medical Advisor for Emergency Medical Services Since there was only responsive proposal for this package, the Fire Department’s designated project manager for this RFP reviewed the submission from Emergency Physicians Associates and verified that the proposer
was responsible and able to meet the City’s requirements. Staff also conducted reference checks with Washington Health Hospital and Santa Clara County Medical Services Agency, both of which provided positive feedback. Upon approval by City Council, staff will negotiate and execute an agreement with Emergency Physicians Associates for an amount not to exceed $108,838 for the five-year term substantially in accordance with the City’s standard terms and conditions.
POLICY ALTERNATIVE(S):
Alternative 1: Do not negotiate and execute agreements with Life Extension Clinics, Inc. and Emergency Physicians Associates San Jose PC and direct staff to extend the current agreements with Kaiser Permanente and Stanford Healthcare.
Pros: None
Cons: The City’s current agreements with Kaiser Permanente and Stanford Healthcare for these services end June 30, 2026. There is most likely insufficient time to negotiate contract extensions, risking a gap in coverage.
Further, the Kaiser agreement requires uniformed staff to travel to Kaiser’s Fremont facilities for their examinations, whereas Life Extension Clinics, Inc. offers on-site services at Fire Station 1. Most critically, the City is contractually mandated by the County to maintain a designated medical advisor; a lapse in services would jeopardize the City’s Emergency Medical Services operations.
Reason for Not Recommending: Not approving staff’s recommendations would lead to operational disruptions, potential loss of medical oversight, inability to meet contractual obligations to the County, and significantly increase staff time required to renegotiate current agreements and/or conduct a new solicitation.
PROJECT SCHEDULE/KEY MILESTONES
Negotiate and execute agreements with Life Extension Clinics, Inc. and Emergency Physicians Associates San Jose PC substantially in compliance with the City’s standard terms and conditions by June 30, 2026. The executed contracts will have a contract term of July 1, 2026 through June 30, 2031.
FISCAL IMPACT:
Package A: Annual Physical Exams and Related Services: The maximum compensation for the five-year term of the agreement with Life Extension Clinics, Inc. is $400,000. Funding in Fiscal Year 2026-27 for these services is included in the 2026-2027 Proposed Operating Budget will be brought to City Council for adoption in June 2026. Future funding will be subject to the appropriation of funds.
Package B: Medical Advisor for Emergency Medical Services: The maximum compensation for the five-year term of the agreement with Emergency Physicians Associates San Jose PC is $108,838. Funding in Fiscal Year 2026-27 for these services is included in the 2026-2027 Proposed Operating Budget will be brought to City Council for adoption in June 2026. Future funding will be subject to the appropriation of funds.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
This item is not a project under the California Environmental Quality Act (CEQA) Guideline 15378(b).
ATTACHMENT(S):
N/A
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Conduct a Public Hearing and Consider Adopting an Urgency Ordinance Adding a New Section to Title XIII, Chapter B.20 of the Milpitas Municipal Code to Create a Transit-Oriented Development Overlay Zoning District to Implement Senate Bill 79 Development Standards (Staff Contact: Jay Lee, Planning Director, 408-586-3073)
Category: Public Hearings-Community Development
Meeting Date: 5/19/2026
Recommendation: Conduct a public hearing and determine that the urgency ordinance is statutorily exempt from the California Environmental Quality Act (CEQA) under Government Code Section 65912.160(c)(2) and adopt an Urgency Ordinance adding a new section to Title XIII, Chapter B.20 of the Milpitas Municipal Code to create a Transit- Oriented Development Overlay (TOD) zoning district and regulations implementing Senate Bill 79 development standards (P-ZA26-0003) with immediate effect.
BACKGROUND:
Senate Bill 79 (SB 79), the Abundant and Affordable Homes Near Transit Act signed by Governor Newsom on October 10, 2025, establishes new statewide requirements for the approval of transit-oriented housing developments near major transit stops, with the intent to increase housing production and promote sustainable, transit-accessible communities. SB 79 adds Sections 65912.155 et seq. to the California Government Code, setting forth eligibility criteria, development standards, and streamlined approval processes for qualifying projects within designated proximity to transit facilities. The law becomes operative on July 1, 2026, and preempts local zoning and development standards that are inconsistent with its provisions, unless a city adopts local implementing regulations that are consistent with SB 79.
In anticipation of SB 79’s effective date, the City of Milpitas initiated the preparation of an urgency ordinance to establish interim local regulations for qualifying housing projects. The urgency ordinance is intended to ensure the City zoning code remains consistent with state law and that local standards for development, affordability, and tenant protections continue to apply to eligible projects during the period before a permanent implementing ordinance can be adopted through the standard legislative process. The urgency ordinance was developed in coordination with the Planning Department, City Attorney’s Office, and other relevant City departments, following established procedures for zoning code amendments and in compliance with applicable state and local requirements.
The City Council’s consideration of this urgency ordinance is a direct response to the statutory deadlines and requirements imposed by SB 79. The ordinance is structured to take effect immediately upon adoption by a four-fifths vote, as authorized by California Government Code Section 36937(b), and will remain in force only until a permanent ordinance is adopted and becomes effective. This approach is consistent with the City’s prior use of urgency ordinances to address immediate regulatory needs arising from changes in state law affecting land use and housing policy.
ANALYSIS:
The City of Milpitas has demonstrated its long-standing policy for higher density housing development in its areas served by transit. Since 2002, the City has adopted two Specific Plans (Gateway-Main Street, formerly the Midtown Specific Plan, and Milpitas Metro, formerly Transit Area Specific Plan) that have all increased density around the Tier 1 and Tier 2 TOD Zones. The Metro plan already permits densities in line with SB 79.
The area surrounding the Milpitas Transit Center (Tier 1) is zoned MXD3-Metro and allows residential density
up to 250 du/acre and building heights up to 275 feet. Moreover, many of the properties immediately adjacent to the Milpitas Transit Center have already been redeveloped with multi-family residential. The Gateway Plan permits densities ranging from 12 to 65 du/acre in the half-mile area surrounding the Great Mall Light Rail Station (Tier 2). Under SB 79, these parcels could be eligible for additional density. However, many of the properties immediately adjacent to the Great Mall Light Rail Station have also been redeveloped with multi- family residential.
Although many areas eligible for SB 79 have been recently redeveloped due to the City’s Specific Plan efforts, the proposed ordinance amendment would implement the minimum densities and height maximums under SB 79 and establish residential development standards for sites that are not zoned for residential development but subject to SB 79.
Proposed Amendments to the Zoning Ordinance
Based on feedback from the Planning Commission at its April 22, 2026 meeting regarding the permanent SB 79 implementing ordinance and to better align with the State’s goals for transit-oriented development, staff amended the development standards to increase the minimum allowable densities across both Tiers. The applicable development standards have also been changed to better match the densities. The new minimum densities and standards are shown in Table 1.
The proposed ordinance implements SB 79 and includes the following amendments to Title XIII of the Milpitas Municipal Code (MMC):
• Add subsection B.20.040 Transit-Oriented Development Overlay Zone to Chapter B.20 Overlay Zones and Standards to implement California Government Code Sections 65912.155 through 65912.162 (SB 79). Specifically, it establishes the applicability of the TOD overlay under SB 79, incorporates the relevant definitions under the Government Code, and sets forth the minimum residential and height standards for qualifying housing projects.
• Specifically, the following development standards will apply:
Table 1: Transit-Oriented Development (-TOD) Overlay Zone Development Standards
Distance Tier 1 Tier 2
Adjacent to TOD stop (within
200 feet of pedestrian access
point)
Maximum Height: 95 feet
Minimum Density: 60 du/ac
Maximum Density: 160 du/ac
Maximum Residential FAR:
4.5 Maximum Height: 85 feet
Minimum Density: 60 du/ac
Maximum Density: 140 du/ac
Maximum Residential FAR:
4.0 ¼-mile from TOD stop Maximum Height: 75 feet
Minimum Density: 60 du/ac
Maximum Density: 120 du/ac
Maximum Residential FAR:
3.5 Maximum Height: 65 feet
Minimum Density: 60 du/ac
Maximum Density: 100 du/ac
Maximum Residential FAR:
3.0 ½-mile from TOD stop Maximum Height: 65 feet
Minimum Density: 60 du/ac
Maximum Density: 100 du/ac
Maximum Residential FAR:
3.0 Maximum Height: 55 feet
Minimum Density: 50 du/ac
Maximum Density: 80 du/ac
Maximum Residential FAR:
2.5 • Projects will be required to follow all other development standards as specified for in the R4-Metro and R5-Metro zoning districts.
• For parcels zoned R1-6 (single-family residential), a qualifying housing project will be subject to a minimum density of 30 du/acre and must follow all other development standards as specified under the R4 zoning district.
Proposed Amendments to the Zoning Map
The proposed zoning map amendment (Attachment B) will implement the Transit-Oriented Development (-TOD) Overlay on the City’s Zoning Map, enacted by Title XIII, Chapter A, Section 2.060 of the Milpitas
Municipal Code. The TOD Overlay will apply to all parcels within the half-mile areas surrounding the three major transit stops, as defined by Senate Bill 79 – the Milpitas BART Station, Great Mall VTA Light Rail Station and Alder VTA Light Rail Station.
General Plan Conformance
The City’s General Plan is the primary long-range planning document that provides the vision for the future growth and development of Milpitas. The proposed zoning text and map amendments implementing SB 79 conform to the policies and standards in the City’s General Plan, as demonstrated in the following table:
Table 2: General Plan Consistency
Policy / Actions Conformance
Implementation
Policy IM 1-2:
Require the City’s Zoning Ordinance,
planning documents, master plans,
infrastructure projects, and development
projects to be consistent with the General
Plan and State law.
Consistent. This zoning ordinance and map
amendment will implement recent legislation
(SB 79) and bring the Zoning Ordinance into
conformance with state housing law.
Land Use Element
Policy LU 2-3:
Allow densities and intensities which exceed
the generally allowed ranges defined by the
underlying land use for projects utilizing
Density Bonus provisions including bonuses
for senior housing, affordable housing, and
for projects within designated overlay
districts.
Consistent. The intent of SB 79 is to build
more homes near transit to reduce housing
and transportation costs for California families
and promote environmental sustainability,
economic growth, and reduce traffic
congestion. Implementing the TOD Overlay
District will not only bring the Zoning
Ordinance into conformance with state law but
also permit a greater variety of housing types
in densities in areas close to major transit
stops.
Land Use Element
Policy LU 2-2:
Continue to utilize Overlay Zoning Districts
as needed to supplement land use and
zoning standards with additional allowances
and regulations that reflect and use and
policy objectives for a particular area.
Consistent. The intent of SB 79 is to build
more homes near transit to reduce housing
and transportation costs for California families
and promote environmental sustainability,
economic growth, and reduce traffic
congestion. Implementing the TOD Overlay
District will not only bring the Zoning
Ordinance into conformance with state law but
also permit a greater variety of housing types
in densities in areas close to major transit
stops.
Land Use Element
Policy LU 3-2:
Continue to utilize planning tools (including
specific plans and overlay districts) that
promote transit-oriented and mixed-use
development objectives near the Milpitas
Transit Center.
Consistent. The TOD Overlay District will
coincide with regional efforts and conform with
state law to allow higher densities near transit
and specifically continue to promote housing
near the Milpitas Transit Center.
Specific Plan Conformance
The proposed zoning ordinance and map amendments are in both the Milpitas Metro (Metro) Specific Plan and Gateway-Main Street (Gateway) Specific Plan area. These designations provide for high-density and medium- density residential uses. As demonstrated in Table 5, the proposed zoning ordinance and map amendments are consistent with the applicable Metro and Gateway-Main Street Specific Plan land use policies.
Table 3: Metro and Gateway-Main Street Specific Plan Consistency
Policy Conformance
Metro Specific Plan Land Use
Policy LU2:
Capitalize on the transit orientation of the
Plan Area to support transit ridership,
reduce traffic congestion and greenhouse
gas emissions, and support livability.
Consistent. The core of the Metro Plan
Vision is to create a complete and unique
urban neighborhood. The TOD Overlay
District will not only conform with state law to
allow higher densities near transit but also
specifically continue to promote a variety of
housing near the Milpitas Transit Center.
Metro Specific Plan Land Use
Policy LU3:
Provide transit-oriented housing that is
accessible and affordable for a range of
household types and income levels.
Consistent. The TOD Overlay District will not
only conform with state law to allow higher
densities near transit but also specifically
continue to promote a variety of housing near
the Milpitas Transit Center.
Gateway-Main Street Specific Plan
Guiding Principle:
Integrate a mix of housing types, scales, and
affordability, including mixed-use, housing
for families, smaller unit homes, live-work,
senior housing, and affordable housing.
Consistent. While the proposed zoning map
and text amendment would only affect the
southern end (South of O’Toole Elms Park to
Curtis Avenue) of the Main Street District,
South Railyards District, Elmwood District,
and the Curtis neighborhood of the Gateway
Plan, the TOD Overlay District will help
implement the Plan’s vision of Main Street as
a walkable, mixed-use urban village
accessible from the surrounding community.
The TOD Overlay District will allow higher
densities near the Great Mall Light Rail
Station, which will continue to facilitate a
variety of housing types at different
affordability levels near transit.
Findings for Approval
The City Council shall consider the following findings in considering approval of a zoning ordinance amendment:
Zoning Ordinance Text and Map Amendments (Milpitas Municipal Code Section XIII, Chapter D.6.050) a. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of the General Plan.
The proposed text and map amendments are specifically consistent with General Plan Policy IM 1- 2, which states to require the City’s Zoning Ordinance, planning documents, master plans, infrastructure projects, and development projects to be consistent with the General Plan and State law. This zoning ordinance and map amendment will implement recent legislation (SB 79) and bring
the Zoning Ordinance into conformance with state housing law. The proposed text and map amendments are also consistent with General Plan Policy LU2-3, which states to allow densities and intensities which exceed the generally allowed ranges defined by the underlying land use for projects utilizing Density Bonus provisions including bonuses for senior housing, affordable housing, and for projects within designated overlay districts, as well as General Plan Policy LU2-2, which states to continue to utilize Overlay Zoning Districts as needed to supplement land use and zoning standards with additional allowances and regulations that reflect and use and policy objectives for a particular area. The intent of SB 79 is to build more homes near transit to reduce housing and transportation costs for California families and promote environmental sustainability, economic growth, and reduce traffic congestion. Implementing the TOD Overlay District will not only bring the Zoning Ordinance into conformance with state law but also permit a greater variety of housing types in densities in areas close to major transit stops. The proposed text and map amendments are also consistent with General Plan Policy LU3-1, which states to support regional efforts that promote higher densities near major transit and travel facilities, and reduce regional vehicle miles traveled by supporting active modes of transportation including walking, biking, and public transit; support local and regional land use decisions that promote safe access to and the use of alternatives to auto transit, as well as General Plan Policy LU3-2, which states to continue to utilize planning tools (including specific plans and overlay districts) that promote transit-oriented and mixed-use development objectives near the Milpitas Transit Center. The TOD Overlay District will coincide with regional efforts and conform with state law to allow higher densities near transit and specifically continue to promote housing near the Milpitas Transit Center.
b. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of any Specific Plan, if applicable;
The proposed zoning text and map amendments are consistent with and conform to the goals and policies of the Milpitas Metro Specific Plan (Metro). The core of the Metro Plan Vision is to create a complete and unique urban neighborhood. The proposed zoning text and map amendments are specifically consistent with Metro Specific Plan Land Use Policy LU2 (Transit Orientation), which states to capitalize on the transit orientation of the Plan Area to support transit ridership, reduce traffic congestion and greenhouse gas emissions, and support livability, and LU3 (Housing Diversity and Affordability), which states to provide transit-oriented housing that is accessible and affordable for a range of household types and income levels. The TOD Overlay District will not only conform with state law to allow higher densities near transit but also specifically continue to promote a variety of housing near the Milpitas Transit Center. The proposed zoning text and map amendments are also consistent with and conform to the goals and policies of the Gateway-Main Street Specific Plan (Gateway). While the proposed zoning map and text amendment would only affect the southern end (South of O’Toole Elms Park to Curtis Avenue) of the Main Street District, South Railyards District, Elmwood District, and the Curtis neighborhood of the Gateway Plan, the TOD Overlay District will help implement the Plan’s vision of Main Street as a walkable, mixed-use urban village accessible from the surrounding community. One of the guiding principles of the Gateway Plan is to integrate a mix of housing types, scales, and affordability, including mixed-use, housing for families, smaller unit homes, live-work, senior housing, and affordable housing. The TOD Overlay District will allow higher densities near the Great Mall Light Rail Station, which will continue to facilitate a variety of housing types at different affordability levels near transit.
c. The proposed Zoning Amendment will not adversely affect public health, safety and welfare;
The proposed zoning text and map amendments will not be detrimental to the public interest, health, safety, convenience, and general welfare, because the action would allow varying residential densities in the TOD Overlay District that are consistent with State law and bring the overall Zoning Ordinance into conformance with State law. They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development.
Moreover, the City retains authority through any future discretionary approvals to address project- specific health, safety, and welfare concerns in the TOD Overlay District.
d. The proposed Zoning Amendment is in compliance with the provisions of California Environmental Quality Act;
The proposed zoning text and map amendments are not a project under CEQA pursuant to Government Code Section 65912.160(c)(2). Adoption of the ordinance is a statutory implementation action.
e. When considering a reduction of residential density, ensure compliance with California Government Code Section 65863 by either finding that the remaining sites identified in the Housing Element are adequate to accommodate the City’s share of the regional housing need or by identifying sufficient additional, adequate, and available sites with an equal or greater density so that there is no net loss in residential density; and
This finding is not applicable. The zoning text and map amendments are not reducing residential density.
f. The proposed Zoning Amendment would not result in a net loss of potential housing units.
The proposed Zoning Amendment would not result in a net loss of potential housing, as the Project amends the Zoning Ordinance to allow for qualifying housing projects in transit-oriented development zones pursuant to State law (SB 79).
g. The proposed Zoning Amendment is internally consistent with other applicable provisions of this Title
The proposed Zoning Ordinance Text Amendment is instituting changes to the Zoning Ordinance that reflect and conform with recent State law (SB 79). The purpose of the Zoning Ordinance is to promote public health, safety, comfort, and general welfare, and to enable appropriate and orderly development. More specifically, the Zoning Ordinance was adopted to provide standards for orderly growth and development of the city, and guide and control the use of land to provide a safe, harmonious, attractive, and sustainable community, as well as achieve the arrangement of land uses depicted in the General Plan, consistent with the goals and policies of the General Plan. The proposed zoning text amendment will create a Transit-Oriented Development Overlay District that will specifically apply to qualifying housing projects within a half mile of qualifying transit-oriented development stops. The amendments are consistent with the Zoning Ordinance as a whole and do not create any internal inconsistencies.
h. The affected site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed new zone; and
The proposed Zoning Map Amendment is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed zone. The TOD Overlay would simply bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
i. If located within or adjacent to residential areas, the requested zone change is compatible with the character of the residential neighborhood.
The proposed zoning map amendment would create a TOD Overlay District in the half mile areas around three transit-oriented development stops within the City. The proposed map amendment is generally compatible with the character of the residential neighborhoods. The TOD Overlay would bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit- oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
Urgency Ordinance
The urgency ordinance is proposed as a necessary interim measure to ensure the City of Milpitas maintains local regulatory authority over transit-oriented housing development in advance of the July 1, 2026, effective date of Senate Bill 79 (SB 79). SB 79 establishes new statewide requirements for the approval of qualifying housing projects near major transit stops and preempts any local zoning or development standards that are inconsistent with its provisions, unless a city adopts local implementing regulations that are consistent with state law. The urgency ordinance is structured to take effect immediately upon adoption by a four-fifths vote of the City Council, as authorized by California Government Code Section 36937(b), thereby preventing any regulatory gap between the effective date of SB 79 and the adoption of a permanent local ordinance.
The ordinance is designed to align the City’s zoning code with the new state requirements by establishing a Transit-Oriented Development (TOD) Overlay District and incorporating SB 79’s eligibility criteria, development standards, and streamlined approval processes for qualifying projects. This approach enables the City to continue applying locally tailored standards for development, affordability, and design within the parameters set by state law, while also ensuring consistency with the Milpitas 2040 General Plan, the Milpitas Metro Specific Plan, and the Gateway-Main Street Specific Plan.
Adoption of the urgency ordinance will allow the City to:
• Apply objective local development standards and design guidelines to qualifying transit-oriented housing projects, provided these standards do not conflict with SB 79. • Maintain consistency with adopted specific plans and the General Plan, supporting the City’s long-term vision for higher-density, mixed-use, and transit-accessible neighborhoods. • Ensure that local procedures for zoning amendments, public notice, and hearings are followed to the extent permitted by state law, thereby supporting transparency and public participation in the land use process.
• Provide a clear regulatory framework for applicants and staff during the interim period, reducing uncertainty and the risk of project delays or legal challenges
If the urgency ordinance is not adopted, the City would be required to process qualifying projects solely under the default standards established by SB 79, which may not reflect local planning objectives or community preferences. The urgency ordinance is therefore a critical tool for preserving the City’s ability to implement local standards and to manage the transition to full compliance with SB 79.
POLICY ALTERNATIVE(S):
Alternative 1: Do not adopt the Urgency Ordinance.
Pros: None
Cons: If the City does not adopt an urgency ordinance, it would prevent the City from applying any locally tailored development standards, affordability requirements, or tenant protections to eligible projects during the period between the effective date of SB 79 and the adoption of a permanent local ordinance. It would also
increase the likelihood that projects will be approved under state default standards, which may not align with the City’s adopted planning objectives, specific plan policies, or community design preferences.
Reason for Not Recommending: This alternative is not recommended because it would create a temporary gap in the City’s ability to enforce local standards and procedures for qualifying housing development that invoke SB 79. The absence of interim local regulations could undermine established policy goals related to housing quality, affordability, and neighborhood compatibility, and would forfeit the City’s opportunity to maintain consistency with its General Plan and specific plans during the period before a permanent ordinance is adopted
PROJECT SCHEDULE/KEY MILESTONES
The following timeline outlines the key steps for implementation:
• May 19, 2026: City Council consideration and potential adoption of the urgency ordinance. • Immediate: Ordinance becomes effective upon adoption by a four-fifths vote, ensuring no lapse in local regulatory authority.
• May 19, 2026: City Council consideration and potential adoption of the permanent ordinance. • May – June 2026: Publication and posting of the adopted ordinance in accordance with Government Code Section 36933.
• June 2, 2026: City Council consideration and potential second reading of the permanent ordinance. • July 1, 2026: SB 79 becomes operative statewide; City’s urgency ordinance ensures local standards remain in effect.
• July 2, 2026: Potential permanent ordinance goes into effect and the urgency ordinance is automatically repealed.
FISCAL IMPACT:
There is no direct fiscal impact associated with adoption of the proposed urgency ordinance. Any administrative costs associated with ordinance adoption and California Department of Housing and Community Development (HCD) coordination would be absorbed within existing departmental resources.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
The proposed urgency ordinance is statutorily exempt from the California Environmental Quality Act (CEQA) under Government Code Section 65912.160(c)(2). This is an ordinance implementing Senate Bill 79.
ATTACHMENT(S):
(a) Draft Urgency Ordinance (with Exhibit 1: Zoning Map Amendment)
1 Ordinance 38.860
REGULAR
NUMBER: 38.860
TITLE: AN UNCODIFIED URGENCY ORDINANCE OF THE CITY COUNCIL
OF THE CITY OF MILPITAS AMENDING THE ZONING MAP AND
MILPITAS MUNICIPAL CODE TITLE XIII, CHAPTER B.20, TO ADD
THE TRANSIT-ORIENTED DEVELOPMENT OVERLAY DISTRICT
AND REGULATIONS IMPLEMENTING SENATE BILL 79
DEVELOPMENT STANDARDS, AND DETERMINING THE
ORDINANCE TO BE EXEMPT FROM CEQA.
HISTORY: This Urgency Ordinance was adopted by the City Council by a four-fifths (4/5) vote to protect the public health, safety and welfare at its meeting of ____________________, upon motion by_________________________. The Ordinance was duly passed and ordered published in accordance with law by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: APPROVED:
________________________________ ______________________________ Suzanne Guzzetta, City Clerk Carmen Montano, Mayor
APPROVED AS TO FORM:
________________________________________
Christian M. Curtis, City Attorney
2 Ordinance 38.860
RECITALS AND FINDINGS:
WHEREAS, Senate Bill 79 (“SB 79”) was signed on October 10, 2025, and codified as California Government Code Sections 65912.155 et seq., and states, among other things, that notwithstanding local law to the contrary, and effective July 1, 2026, a housing development project, as defined, within one-half mile of a transit oriented development stop, as defined, is an allowed use as a transit-oriented housing development on any site zoned for residential, mixed, or commercial development, if the development complies with applicable requirements, as specified; and
WHEREAS, SB 79 is anticipated to affect development near three (3) transit-oriented development stops within Milpitas (the Milpitas BART Station, the Great Mall VTA Light Rail Station, and the Alder VTA Light Rail Station); and
WHEREAS, it is estimated that there are about 3,500 parcels within one-half mile of these three (3) transit-oriented developments stops within Milpitas; and WHEREAS, California Government Code Sections 65300 et seq. require each city to prepare and adopt a comprehensive, long-term general plan for the physical development of the county or city; and
WHEREAS, on March 9, 2021, the Milpitas City Council adopted the Milpitas 2040 General Plan, updating and revising the land use policies, goals, and objectives contained in the City’s previous General Plan; and
WHEREAS, on September 2, 2025, the Milpitas City Council adopted a comprehensive update to the zoning ordinance, including the addition of a new Title XIII – Zoning to the Milpitas Municipal Code and amendments to various other sections of the Municipal Code for consistency with the updated Zoning Ordinance and amended the Zoning Map of the City of Milpitas to achieve consistency between the updated Zoning Ordinance and Zoning Map; and WHEREAS, pursuant to the City’s General Plan and the implementing Zoning Ordinance, the following zoning districts allow residential, mixed, or commercial development:
General Commercial (C2), Metro Business Park Research and Development – Limited Residential (BPRD-R-Metro), Metro Multi-Family High Density Residential (R3-Metro), Metro Multi-Family Very High Density Residential (R4-Metro), Metro Urban Residential (R5-Metro), Metro High Density Mixed Use (MXD2-Metro), Metro Very High Density Mixed Use (MXD3- Metro), Multi-Family (R3), Multi-Family Very High Density (R4), Single-Family (R1), Mixed Use (MXD), and Main Street Mixed-Use (MS-MU); and
WHEREAS, pursuant to the City’s General Plan and the implementing Zoning Ordinance, the following zoning districts are not zoned for residential, mixed, or commercial development: Heavy Industrial (M2), Institutional (I), Park and Public Open Space (POS), Business Park Research and Development (BPRD), and Metro Business Park Research and Development (BPRD-Metro). The City Council finds and determines that it is not and was not its intent to zone properties in these districts for residential, mixed, or commercial development and that any residential, mixed, or commercial use allowed in these zones is incidental and neither determinative nor reflective of the purpose for which these properties were zoned; and
3 Ordinance 38.860
WHEREAS, SB79 may allow residential units in areas not already zoned for residential development and fails to explicitly specify a process for applying the various local zoning regulations governing residential development to facilitate its compatibility with neighboring uses and protect the public health, safety and welfare; and WHEREAS, absent local regulation addressing the new circumstances created by SB79, SB79’s absence of a clear process for applying local residential zoning rules outside of residential zones creates a possibility of residential development contrary to existing local regulations necessary to protect health, safety, and welfare; and WHEREAS, while SB 79 does not apply to all parcels and all projects within one-half mile of transit-oriented development stops, in the absence of locally tailored regulations providing an orderly and legally compliant implementation of SB 79, persons and entities seeking to develop in these areas would no longer have clear planning regulations, which will result in unnecessarily delayed and substandard development, including the development of housing and affordable housing projects critical to the shelter of residents during a time in which the State of California has declared the state to be in a housing crisis; and WHEREAS, California Government Code Section 65912.160 provides that a local government may enact an ordinance to make its zoning code consistent with SB 79 and that such an ordinance is not considered a project subject to environmental review pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code (the California Environmental Quality Act or “CEQA”); and
WHEREAS, the City has diligently prepared Zoning Amendment No. ZA26-0003 (“Amendment”) to the City’s Municipal Code, adding a new section to Title XIII, Chapter B.20 of the Milpitas Municipal Code to create a Transit-Oriented Development Overlay (-TOD) zoning district and regulations implementing Senate Bill 79 development standards (“Regular Ordinance”); and
WHEREAS, consistent with California Government Code Section 65912.160(d), at least 14 days prior to the adoption of the Regular Ordinance, the City submitted a draft of this ordinance to the California Department of Housing and Community Development (“HCD”) and received no feedback from HCD; and
WHEREAS, consistent with California Government Code Section 65912.160(d), within 60 days of enacting the Regular Ordinance, the City is to submit it to HCD for review, and HCD has up to 120 days to report to the City whether it believes the enacted ordinance is in substantial compliance with SB 79; and
WHEREAS, the extended time periods for HCD review and consequently limited time to implement SB 79 necessitate an interim enactment to guide development while the City takes more permanent action; and
WHEREAS, the City Council is the final authority on General Plan, Specific Plan, and Zoning amendments, including amendments to the Land Use Map and Zoning Map; and WHEREAS, on May 19, 2026, the City Council held a lawfully-noticed public hearing and after considering all testimony and written materials provided in connection with that
4 Ordinance 38.860
hearing adopted this Urgency Ordinance, waived the reading thereof, and declared it necessary for the immediate preservation of the public peace, health, and safety; and WHEREAS, SB 79 takes effect on July 1, 2026, and a regular, non-urgency ordinance implementing SB 79 would not become effective until 30 days after its adoption at a second reading, pursuant to California Government Code Section 36937; and WHEREAS, without adoption of this Ordinance on an urgency basis, there exists an interim period between July 1, 2026, the date SB 79 becomes operative, and the date a permanent, non-urgency ordinance implementing SB 79 would otherwise take effect, during which qualifying transit-oriented housing development projects within one-half mile of the Milpitas BART Station, the Great Mall VTA Light Rail Station, and the Alder VTA Light Rail Station could be submitted and processed without the clearly applicable benefit of the City's locally tailored development standards, objective design standards, affordability requirements, tree protection regulations, anti-displacement protections, and other local regulations established by this Ordinance; and
WHEREAS, the absence of locally adopted implementing regulations during this interim period constitutes a current and immediate threat to the public peace, health, and safety because, without immediate adoption of this Urgency Ordinance, the City would be well-positioned to apply its locally tailored standards to qualifying transit-oriented housing development projects submitted on or after July 1, 2026, and it is the present intention of the City Council to keep this Urgency Ordinance in effect only until the adoption and effective date of a permanent ordinance implementing SB 79; and
WHEREAS, the City Council finds and declares that this Urgency Ordinance is necessary for the immediate preservation of the public peace, health, and safety within the meaning of California Government Code Sections 65858 and 36937, and that the facts constituting such urgency are set forth herein; and
WHEREAS, all prerequisites for the adoption of this ordinance have been met.
NOW, THEREFORE, the City Council of the City of Milpitas does ordain as follows:
SECTION 1. RECORD AND BASIS FOR ACTION
The City Council has duly considered the full record before it, which may include but is not limited to such things as the City staff report, testimony by staff and the public, and other materials and evidence submitted or provided to the City Council. Furthermore, the recitals set forth above are found to be true and correct and are incorporated herein by reference.
SECTION 2. ZONING ORDINANCE TEXT AND MAP AMENDMENT FINDINGS (XIII-D.6.050)
The City Council makes the following findings based on the evidence in the public record in support of this Urgency Ordinance’s adoption:
a. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of the General Plan;
5 Ordinance 38.860
The proposed text and map amendments are specifically consistent with General Plan Policy IM 1-2, which states to require the City’s Zoning Ordinance, planning documents, master plans, infrastructure projects, and development projects to be consistent with the General Plan and State law. This zoning ordinance and map amendment will implement recent legislation (SB 79) and bring the Zoning Ordinance into conformance with state housing law. The proposed text and map amendments are also consistent with General Plan Policy LU2-3, which states to allow densities and intensities which exceed the generally allowed ranges defined by the underlying land use for projects utilizing Density Bonus provisions including bonuses for senior housing, affordable housing, and for projects within designated overlay districts, as well as General Plan Policy LU2-2, which states to continue to utilize Overlay Zoning Districts as needed to supplement land use and zoning standards with additional allowances and regulations that reflect and use and policy objectives for a particular area. The intent of SB 79 is to build more homes near transit to reduce housing and transportation costs for California families and promote environmental sustainability, economic growth, and reduce traffic congestion.
Implementing the TOD Overlay District will not only bring the Zoning Ordinance into conformance with state law but also permit a greater variety of housing types in densities in areas close to major transit stops. The proposed text and map amendments are also consistent with General Plan Policy LU3-1, which states to support regional efforts that promote higher densities near major transit and travel facilities, and reduce regional vehicle miles traveled by supporting active modes of transportation including walking, biking, and public transit; support local and regional land use decisions that promote safe access to and the use of alternatives to auto transit, as well as General Plan Policy LU3-2, which states to continue to utilize planning tools (including specific plans and overlay districts) that promote transit-oriented and mixed-use development objectives near the Milpitas Transit Center. The TOD Overlay District will coincide with regional efforts and conform with state law to allow higher densities near transit and specifically continue to promote housing near the Milpitas Transit Center.
b. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of any Specific Plan, if applicable;
The proposed zoning text and map amendments are consistent with and conform to the goals and policies of the Milpitas Metro Specific Plan (Metro). The core of the Metro Plan Vision is to create a complete and unique urban neighborhood. The proposed zoning text and map amendments are specifically consistent with Metro Specific Plan Land Use Policy LU2 (Transit Orientation), which states to capitalize on the transit orientation of the Plan Area to support transit ridership, reduce traffic congestion and greenhouse gas emissions, and support livability, and LU3 (Housing Diversity and Affordability), which states to provide transit-oriented housing that is accessible and affordable for a range of household types and income levels. The TOD Overlay District will not only conform with state law to allow higher densities near transit but also specifically continue to promote a variety of housing near the Milpitas Transit Center. The proposed zoning text and map amendments are also
6 Ordinance 38.860
consistent with and conform to the goals and policies of the Gateway-Main Street Specific Plan (Gateway). While the proposed zoning map and text amendment would only affect the southern end (South of O’Toole Elms Park to Curtis Avenue) of the Main Street District, South Railyards District, Elmwood District, and the Curtis neighborhood of the Gateway Plan, the TOD Overlay District will help implement the Plan’s vision of Main Street as a walkable, mixed-use urban village accessible from the surrounding community. One of the guiding principles of the Gateway Plan is to integrate a mix of housing types, scales, and affordability, including mixed-use, housing for families, smaller unit homes, live-work, senior housing, and affordable housing. The TOD Overlay District will allow higher densities near the Great Mall Light Rail Station, which will continue to facilitate a variety of housing types at different affordability levels near transit.
c. The proposed Zoning Amendment will not be detrimental to the public interest, health, safety, convenience, and general welfare;
The proposed zoning text and map amendments will not be detrimental to the public interest, health, safety, convenience, and general welfare, because the action would allow varying residential densities in the TOD Overlay District that are consistent with State law and bring the overall Zoning Ordinance into conformance with State law. They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. Moreover, the City retains authority through any future discretionary approvals to address project- specific health, safety, and welfare concerns in the TOD Overlay District.
d. The proposed Zoning Amendment is in compliance with the provisions of California Environmental Quality Act;
The proposed zoning text and map amendments are not a project under CEQA pursuant to Government Code Section 65912.160(c)(2). Adoption of the ordinance is a statutory implementation action.
e. When considering a reduction of residential density, ensure compliance with California Government Code Section 65863 by either finding that the remaining sites identified in the Housing Element are adequate to accommodate the City’s share of the regional housing need or by identifying sufficient additional, adequate, and available sites with an equal or greater density so that there is no net loss in residential density;
This finding is not applicable. The zoning text and map amendments are not reducing residential density.
f. The proposed Zoning Amendment would not result in a net loss of potential housing units;
7 Ordinance 38.860
The proposed Zoning Amendment would not result in a net loss of potential housing, as the Project amends the Zoning Ordinance to allow for qualifying housing projects in transit-oriented development zones pursuant to State law (SB 79).
g. The proposed Zoning Ordinance Text Amendment is internally consistent with other applicable provisions of this Title;
The proposed Zoning Ordinance Text Amendment is instituting changes to the Zoning Ordinance that reflect and conform with recent State law (SB 79). The purpose of the Zoning Ordinance is to promote public health, safety, comfort, and general welfare, and to enable appropriate and orderly development. More specifically, the Zoning Ordinance was adopted to provide standards for orderly growth and development of the city, and guide and control the use of land to provide a safe, harmonious, attractive, and sustainable community, as well as achieve the arrangement of land uses depicted in the General Plan, consistent with the goals and policies of the General Plan. The proposed zoning text amendment will create a Transit-Oriented Development Overlay District that will specifically apply to qualifying housing projects within a half mile of qualifying transit-oriented development stops. The amendments are consistent with the Zoning Ordinance as a whole and do not create any internal inconsistencies.
h. The affected site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed new zone; and
The proposed Zoning Map Amendment is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed zone. The TOD Overlay would simply bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If the projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
i. If located within or adjacent to residential areas, the requested zone change is compatible with the character of the residential neighborhood.
The proposed zoning map amendment would create a TOD Overlay District in the half mile areas around three transit-oriented development stops within the City. The
8 Ordinance 38.860
proposed map amendment is generally compatible with the character of the residential neighborhoods. The TOD Overlay would bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If the projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
SECTION 3. AMENDMENT OF MILPITAS MUNICIPAL CODE TITLE XIII, CHAPTER B.20
Title XIII, Chapter B.20 of the Milpitas Municipal Code is hereby amended to add Section B.20.040 Transit-Oriented Development Overlay Zone and reads as follows:
A. Purpose. The Transit-Oriented Development (TOD) Overlay Zone implements California Government Code Sections 65912.155 et seq., herein referred to as Senate Bill 79 (SB 79).
B. Applicability. The TOD Overlay Zone is applicable to any zoning district on lands that are within one-half mile from a transit-oriented development stop, as defined by Section 21064.3 of the California Public Resources Code. This Section is only applicable so long as SB 79 is operative and effective and shall thereafter be of no force or effect, including if transit-oriented housing development projects are no longer required by applicable state law to be an allowed use on sites zoned for residential, mixed, or commercial use within the TOD Overlay Zone.
C. Definitions. The following definitions included in California Government Code Section 65912.156 are incorporated herein by reference and shall be applied to this Section only:
1. Housing Development Project;
2. Residential Floor Area Ratio;
3. Tier 1 Transit-Oriented Development Stop;
4. Tier 2 Transit-Oriented Development Stop;
5. Transit-Oriented Development Stop; and
6. Transit-Oriented Development Zone.
Additional definitions provided in California Government Code Section 65912.156 are not directly incorporated in this Section but may be referenced as applicable to this Section only.
The following additional definitions, which do not appear in California Government Code Section 65912.156, also apply to this Section only:
9 Ordinance 38.860
“Transit-oriented housing development project” shall mean housing development projects allowed pursuant to California Government Code Section 65912.157.
D. Permitted, Accessory, and Conditionally Permitted Uses. Notwithstanding anything to the contrary in this Section, the permitted, accessory, and conditional uses allowed within the TOD Overlay Zone are the same uses as allowed within the underlying base zones, except as otherwise required by SB 79.
E. Tier 1 and Tier 2 Transit-Oriented Development Stops
1. The following Tier 1 TOD stops are located within the City of Milpitas:
a. Milpitas BART Station
2. The following Tier 2 TOD stops are located within the City of Milpitas:
a. Great Mall VTA Light Rail Station
b. Alder VTA Light Rail Station
F. Development Standards. The development standards for the underlying base zoning district shall apply, except as modified below:
1. A housing development project shall be an allowed use as a transit-oriented housing development project on any site zoned for residential, mixed, or commercial development within one-half or one-quarter mile of a transit-oriented development stop, if the development complies with the following requirements in addition to all otherwise applicable laws:
a. Includes at least five dwelling units.
b. The average total area of floor space for the proposed units in the transit- oriented housing development project does not exceed 1,750 net habitable square feet.
c. For a transit-oriented housing development project within one-quarter mile of a Tier 1 transit-oriented development stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 75 feet
(ii) Min Density: 60 du/acre; Max density: 120 du/acre
(iii) Residential floor area ratio max: 3.5
(iv) Follow all other development standards as specified for the R5- Metro zoning district.
d. For a transit-oriented housing development project further than one- quarter mile but within one-half mile of a Tier 1 transit-oriented stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 65 feet
10 Ordinance 38.860
(ii) Min Density: 60 du/acre; Max density: 100 du/acre
(iii) Residential floor area ratio max: 3
(iv) Follow all other development standards as specified for the R5- Metro zoning district.
e. For a transit-oriented housing development project within one-quarter mile of a Tier 2 transit-oriented development stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 65 feet
(ii) Min Density: 60 du/acre; Max density 100 du/acre
(iii) Residential floor area ratio max: 3
(iv) Follow all other development standards as specified for the R5- Metro zoning district.
f. For a transit-oriented housing development project further than one- quarter mile but within one-half mile of a Tier 2 transit-oriented development stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 55 feet
(ii) Min Density: 50 du/acre; Max density 80 du/acre
(iii) Residential floor area max: 2.5
(iv) Follow all other development standards as specified under the R4- Metro zoning districts.
g. Areas zoned R1-6: For a qualifying transit-oriented housing development project within the R1 zoning district, the following apply:
(i) Include at least five dwelling units; and
(ii) Max height: See Tier 1 or 2 standards
(iii) Min density: 30 du/acre; Max: See Tier 1 or 2 standards. (iv) Follow all other development standards as specified under the R4 zoning district.
h. Adjacency Bonus: A transit-oriented housing development project that is immediately adjacent to a transit-oriented development stop (200 feet proximity) shall be eligible for an adjacency intensifier to:
(i) Increase the height limit by an additional 20 feet; and (ii) Increase the maximum density by an additional 40 du/acre (iii) Increase the residential floor area ratio by 1
11 Ordinance 38.860
2. For the purposes of this Section, the distance of a transit-oriented housing development project from a transit-oriented development stop shall be measured in a straight line from the nearest edge of the parcel containing the proposed project to a pedestrian access point for the transit-oriented development stop.
3. Transit-oriented housing development projects shall not be located on either of the following:
a. A site containing more than two units where the development would require the demolition of housing that is subject to any form of rent or price control that has been occupied by tenants within the past seven years.
b. A site that was previously used for more than two units of housing that were demolished within seven years before the development proponent submits an application under this Section and any of the units were subject to any form of rent or price control.
4. Transit-oriented housing development projects proposed pursuant to this Section shall meet the labor standards of subparagraphs (A), (B), (C), (D), (F) and (G) of paragraph (8) of subdivision (a) of California Government Code Section 65913.4 for any building over 85 feet in height.
G. Additional Requirements. Transit-oriented housing development projects allowed pursuant to this Section remain subject to local requirements otherwise applicable to housing development projects, including but not limited to:
1. Development plans must be approved pursuant to all applicable design review procedures under Chapter C.2 (General Development Standards), including the Milpitas Residential and Mixed-Use Objective Design Standards.
2. Developments proposing to remove protected trees shall comply with Milpitas Municipal Code Section X-2-7.01 (Existing Trees Protected).
3. All applicable projects must comply with the affordable housing requirements in Milpitas Municipal Code Chapter XII-1 (Affordable Housing Ordinance).
4. Developments proposing to utilize State Density Bonus Law shall comply with the procedures in Chapter C.12 (Density Bonus for Affordable Housing Developments).
a. Developments under this Section shall be eligible for a density bonus, incentives or concessions, waivers or reductions of development standards, and parking ratios pursuant to California Government Code Section 65915, using the density allowed under this Section as the base density. If the development proposes a height under this Section in excess of the height limit, then the City shall not be required to grant the waiver, incentive, or concession pursuant to California Government Code Section 65915 for additional height beyond specified in this Section.
12 Ordinance 38.860
b. A development shall be eligible for the following additional concessions, if it meets the applicable density thresholds specified:
(i) For a development providing housing for extremely low income households, three additional concessions.
(ii) For a development providing housing for very low income households, two additional concessions.
(iii) For a development providing housing for low-income households, one additional concession.
(iv) To qualify for these additional concessions, the development must meet the following applicable density thresholds:
a. For a transit-oriented housing development project within one-quarter mile of a Tier 1 transit-oriented development stop achieve a minimum density of 90 du/acre.
b. For a transit-oriented housing development project further than one-quarter mile but within one-half mile of a Tier 1 transit-oriented stop, achieve a minimum density of 75
du/acre.
c. For a transit-oriented housing development project within one-quarter mile of a Tier 2 transit-oriented development stop, achieve a minimum density of 75 du/acre.
d. For a transit-oriented housing development project further than one-quarter mile but within one-half mile of a Tier 2 transit-oriented development stop, achieve a minimum
density of 60 du/acre.
5. Developments shall comply with all applicable development impact fees.
6. Developments proposing subdivision of land shall comply with Milpitas Subdivision Ordinance (Title XI, Chapter 1).
7. Developments shall comply with California Government Code Section 66300.6, including any local requirements or processes implementing the provisions of Section 66300.6.
8. Developments shall comply with any applicable local demolition and anti- displacement standards established through a local ordinance pursuant to California Government Code Section 65912.157(f) and Title XII (Housing).
9. All standards otherwise applicable under this Title, the General Plan, and any applicable Specific Plan, Planned Use Development, or Development Agreement.
H. Affordability Provisions. A housing development proposed pursuant to this Section shall include on-site housing for lower income households by complying with one of the following requirements:
13 Ordinance 38.860
1. Any of the following:
a. At least 7 percent of the total units are dedicated to extremely low income households, as defined in Section 50106 of the California Health and Safety Code.
b. At least 10 percent of the total units are dedicated to very low income households, as defined in Section 50105 of the California Health and Safety Code.
c. At least 13 percent of the total units are dedicated to lower income households, as defined in Section 50079.5 of the California Health and Safety Code.
2. This Subsection shall not apply to any development of 10 units or less.
3. All units dedicated to extremely low income, very low income, and low-income households pursuant to the above section shall meet both of the following:
a. The units shall have an affordable housing cost, as defined in Government Code Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Government Code Section 50053 of the Health and Safety Code.
b. The development proponent shall agree to the continued affordability of all affordable rental units included pursuant to this section for 55 years and all affordable ownership units included pursuant to this section for a period of 45 years.
4. If the City of Milpitas’s inclusionary housing requirement in Milpitas Municipal Code Chapter XII-1 (Affordable Housing Ordinance) mandates a higher percentage of affordable units or a deeper affordability than that described above, then the City’s inclusionary housing requirement mandate shall apply in addition to the requirements above.
I. Streamlining Incentives.
1. A housing development project proposed pursuant to this Section shall be eligible for streamlined ministerial approval pursuant to California Government Code Section 65913.4 in accordance with all of the following:
a. The proposed project shall be exempt from subparagraph (A) of paragraph (4) of, and paragraph (5) of, subdivision (a) of California Government Code Section 65913.4.
b. The proposed project shall comply with the affordability requirements in subclauses (I) to (III), inclusive of clause (i) of subparagraph (B) of paragraph (4) of subdivision (a) of California Government Code Section 65913.4.
c. The proposed project shall comply with all other requirements of Government Code Section 65913.4, including, but not limited to, the
14 Ordinance 38.860
prohibition against a site that is within a very high fire hazard severity zone, pursuant to subparagraph (D) of paragraph (6) of subdivision (a) of California Government Code Section 65913.4.
2. Any housing development proposed pursuant to this Section not seeking streamlined approval under California Government Code Section 65913.4 shall be reviewed according to the City of Milpitas’s development review process and California Government Code Section 65589.5, except that any zoning standard that conflicts with the requirements of this Section shall not apply.
SECTION 4. AMENDMENT OF THE ZONING MAP OF THE CITY OF MILPITAS The Zoning Map of the City of Milpitas, as amended, which was adopted as part of Ordinance No. 38.858, enacted as Title XIII, Chapter A, Section 2.060 of the Milpitas Municipal Code (“Zoning Map”), is hereby amended by rezoning the land use designation of only those parcels depicted within the depicted map as attached hereto as Exhibit 1.
SECTION 5. CALIFORNIA ENVIRONMENTAL QUALITY ACT
The City Council finds, pursuant to Government Code Section 65912.160(c)(2), the provisions of this Ordinance do not constitute a project and therefore are statutorily exempt from the California Environmental Quality Act.
SECTION 6. URGENCY DECLARATION
Pursuant to California Government Code Sections 65858 and 36937, the City Council hereby finds and declares that this Urgency Ordinance is necessary for the immediate preservation of the public peace, health, and safety, including for the following reasons:
Senate Bill 79 (California Government Code Sections 65912.155 et seq.) takes effect on July 1, 2026. SB 79 permits qualifying housing projects in areas that may not be otherwise zoned for housing projects and fails to specify sufficient standards for the development of such housing projects in the absence of applicable local regulations. If the permanent ordinance implementing SB 79 is adopted as a regular ordinance at a subsequent City Council meeting, it would not become effective until 30 days after the second reading pursuant to California Government Code Section 36937. Between July 1, 2026 and the date on which a permanent ordinance implementing SB 79 would otherwise take effect, there exists an interim period during which qualifying transit-oriented housing development projects may be submitted and processed without the clear benefit of the City's locally tailored development standards, objective design standards, affordability requirements, and other local regulations established by this Ordinance.
During this interim period, the absence of locally adopted implementing regulations would mean that qualifying housing development projects within one-half mile of the Milpitas BART Station, the Great Mall VTA Light Rail Station, and the Alder VTA Light Rail Station would be governed by state default standards that were adopted without reference to local circumstances or regulatory schemes. Such disordered development would not only upset the City's locally tailored standards designed to protect the public peace, health, safety, and welfare of Milpitas residents and neighborhoods but also creates confusion as to the applicability of local regulations that protect the public peace, health, safety, and welfare. This constitutes a current and immediate threat to the public peace, health, and safety, including for the following reasons:
15 Ordinance 38.860
• Without immediate adoption of local implementing standards, there would be untenable confusion in the applicability of the City’s Objective Design Standards, affordability requirements, tree protection regulations, subdivision requirements, and other generally applicable local regulations to qualifying transit-oriented housing development projects submitted on or after July 1, 2026, during the gap period before a permanent ordinance takes effect.
• The interim period between July 1, 2026 and the effective date of a permanent ordinance creates a regulatory gap that, if left unaddressed, could result in the approval of substandard projects that do not reflect the City's community design goals, neighborhood compatibility standards, and infrastructure capacity considerations. • Immediate adoption of this Urgency Ordinance eliminates the regulatory gap by ensuring that the City's locally tailored TOD Overlay District standards are in place and operative as of July 1, 2026, the date SB 79 takes effect, thereby protecting the public peace, health, and welfare of the community without interruption.
The design and construction of substandard development, including housing development and affordable housing development, that does not comply with local regulations, neighborhood compatibility standards, and infrastructure capacity consideration jeopardize the health, safety, and welfare of the public for generations to come and undermines the City’s goals of establishing safe and adequate shelter for its residents.
SECTION 7. SEVERABILITY
The provisions of this Urgency Ordinance are separable, and the invalidity of any phrase, clause, provision, or part has no effect on the validity of the remainder.
SECTION 8. EFFECTIVE DATE AND POSTING
This Urgency Ordinance takes effect immediately upon adoption pursuant to California Government Code Section 36937(b) and shall remain in effect until 45 days from the date of adoption, unless extended or repealed by the City Council in accordance with applicable law.
The City Council hereby directs the City Clerk to cause this Urgency Ordinance or a summary thereof to be published within fifteen (15) days of adoption in accordance with California Government Code Section 36933, and to post a certified copy of this Urgency Ordinance, including the vote for and against the same, in the Office of the City Clerk.
SECTION 9. SUNSET DATE
This Urgency Ordinance shall remain in full force and effect until it expires by its terms or until superseded by a permanent ordinance adopted by the City Council implementing SB 79 and the Transit-Oriented Development Overlay District. Upon the effective date of such permanent ordinance, this Urgency Ordinance shall be deemed superseded and of no further force or effect.
16 Ordinance 38.860
Exhibit 1: Zoning Map Amendment
M
C
C
A
R
T
H
Y
B
L
V
D
L
A
N
D
E
S
S
A
V
E
DOWNING RD
M
O N T A G U E
E X P
Y
L A H O N D A
D
R
N
M
I
L
P
I
T
A
S
B
L
V
D
PIEDMONT RD
J A C K L I N R D
CIELO LINDO CMN
P I M
E N T E L
C
I
R
S
U
N
N
Y
H
I
L
L
S
D
R
S
P
A
R
K
V
I
C
T
O
R
I
A
D
R
W
C
A
L
A
V
E
R
A
S
B
L
V
D
C
A
S
C
A
D I T A T
E
R
E
S
C
U
E
L
A
P
K
W
Y
E CALAVERAS BLVD
MARYLINN DR
U
R
I D
I A
S R
A
N
C
H
R
D
N
P A R K
V
I C
T
O
R
I
A
D
R
L
O
N
D
O
N
D R
M
U
R
P
H
Y
R
A
N
C
H
R
D
B E L S H
A
W
D
R
A
L
E
G
R
A
T
E
R
C
A L A V E R A S
R D
M
E
T
R
O P O
L
I T
A
N
D
R
S
H
A
U
G
H
N
E
S
S
Y
D
R
T
A
S
M
A
N
D
R
C
O
Y
O
T
E C
R
E
E
K
W
A
Y
G
R
E
A
T
M
A
L
L
P
K
W
Y
DIXON LANDING RD
KENNEDY DR
BOTHELO AVE
AYER ST
FIRE WALK
D
U
T
T
O
N
W
O
O
D
L
N
S MILPITAS BLVD
S ABEL ST
N
E
S
T
W
O
O
D
W
A
Y
RUSSELL LN
N ABEL ST
C
A
L
I
F
O
R
N
I
A
C
I
R
C A L L E
M
E
S
A
A
L
T
A
DIXON RD
LOS COCHES ST
O R N E L L A S
D
R
D
E
M
P
S
E
Y
R
D
REFLECTIONS WAY
W
A
S
H
I
N
G
T
O
N
S
Q
U
A
R
E
D
R
WYLIE DR
TOWNE DR
AUGUSTINE PARK
ODYSSEY LN
WASHINGTON DR
JURGENS DR
P
O
P
P
Y
L
N
C
U
R
R
L
I
N
CIR
E
V
A
N
S
R
D
STRICKROTH PARK
PINEWOOD PARK
BEN RODGERS PARK
HALL MEMORIAL PARK
S
T
A
R
L
I
T
E
D
R
HEATH ST
GINGERWOOD DR
ABEL PLAZA
S
T R
A W
B E R
R
Y
L N
C
E L E
B
R
A
T
I
O
N
D
R
GREENWOOD WAY
MANFERD ST
STARLITE PARK
LINDEN LN
S A N A N D R E A S D R
O
A
K
H
U
R
S
T
W
A
Y
W
O O D L A N D
W A Y
CURTIS AVE
HAMMOND WAY
JASMINE CT
ALTON ST
F
A
L
C
A
T
O
D
R
BERYLWOOD LN
CORNING AVE
AUTREY ST
E D E L N
W
E
S
S
E
X
P
L
W
C
A
P
I T
O
L
A V E
OLD EVANS RD
D
U
B
O
I S
S
T
BARBER LN
D
A
V
I D
L N
BERESFORD SQ
S
N
E
L
L
P
L
REDWOOD AVE
DIEL DR
B
A
D
G
E
R
W
O
O
D
L
N
TOWN CENTER DR
T
I M
B
E
R
W
A
Y
CUCIZ LN
CARDOZA PARK
CENTRAL PLAZA
S
I L
V
E
R
L
A
K
E
D R
T R A M W A Y D R
C
U E S T
A
D
R
M
E
A
D
O
W
H
A
V
E
N
W
A
Y
YOSEMITE DR
B A J A R O S E S T
C A M
E R
O
N
C
I
R
C
L O V E R
C
I R
IMAGES CIR
EDSEL DR
BETTENCOURT WAY
T U L A R C I T
O
S
D
R
SANDALWOOD PARK
JUNIPERO DR
P
A
R
K
H
I
L
L
D
R
D
I
A
M
O
N
D
W
A
Y
A
S
P
E
N
R
I D
G
E
D
R
R O
C K Y
M
O
U N T A I N
A V E
F
A
I
R
M
E
A
D
O
W
W A Y
N MAIN ST
Q
U A I L
D R
GORDON ST
SPENCE AVE
N
T
E
M
P
L
E
D
R
A U
G
U
S
T
A
C
T
ROSWELL DR
G
E
R
A
L
D
C
I R
N
H
I
L
L
V
I
E
W
D
R
M
A R
T I L
W
A
Y
MERRY LOOP
CRESTHAVEN ST
GLENVIEW DR
M
O
N
T
E
D
R
COMET DR
O
R
O V I L L E
R
D
EAGLE RIDGE WAY
C
O
E
L H
O
S
T
O N T A R
I O
R
D
L
E
E
W
A
Y
S U T T E R W
I N D
D
R
C O S T I G A N
C
I
R
FIESTA PLAZA
RAILROAD AVE
P I N A R D
S T
N
I
G
H
T
S
H
A
D
E
R
D
FASCINATION PL
S TEMPLE DR
BALBOA DR
M
I
L
K
W
E
E
D
S
T
S
A
G
E
B R U S H
S T
PESCADERO ST
P
A
L
I
S
A
D
E
S
D
R
ELM AVE
PENITENCIA ST
C L E A R
L A K E
A V E
S K Y L I N E
D
R
E
T
H
Y
L
S
T
EASTER AVE
MILMONT DR
ANGUS DR
PIPER DR
FIRETHORN ST
S
E
A
S
I
D
E
W
A
Y
D
U
N
D
E
E
A
V
E
S
T
A
R
L
I T
E
C T
DEMPSEY WAY
S
A
N
A
N
D
R
E
A
S
C
T
ABERDEEN CT
FONTAINBLEU AVE
S
A
S
S
O
N
E
C
T
H
O
U
R
E
T
C
T
L O S
P I N O S
A V E
PESCADERO CT
C
A
L
L
E
V
I
S
T
A
V
E
R
D
E
SAGE CT
C
A
L
A
V
E
R
A
S
R
I
D
G
E
D
R
S U D B U R
Y
D
R
CRACOLICE WAY
Y E L L O
W
S T O N E
A
V
E
R
I
O
V
E
R
D
E
P
L
MCCANDLESS DR
TOWN CENTER
RAND ST
N
O
V
A
C
T
VIENNA DR
G
A
L
I N
D
O
C
T
CAMPBELL ST
SANDALRIDGE CT
T
E
R
N
U
R
A
L
O
O
P
S
U
P
E
R
I
O
R
R
D
L
A
C
R
O
S
S
E
D
R
CORTEZ ST
JACKLIN CT
S
U
M
M
E
R
F
I
E
L
D
D R
SANTA RITA DR
GENEVA RD
C
O
L
U
M
B
U
S
D
R
PALMER ST
J U P I T E
R
D
R
MAZEY ST
S I N G L E
Y D
R
SERRA WAY
BIG BASIN DR
ASHLAND DR
V
E
N
U
S
W
A
Y
W
E L L E R L
N
ARIZONA AVE
S N A P D R A G O N S
T
R
I
D
G
E
M
O
N
T
D
R
BEE CT
MILPITAS SQ
C A R L S B A D
C
T
R
O
G
E
R
S
T
M
E S A
V E R D E
D R
L
A
R
C
H
S
T
SEQUOIA DR
CONWAY ST
F
A
L
L
E
N
L
E
A
F
D
R
N
A
B
B
O
T
T
A
V
E
E
L
C
A
M
I
N
O
H
I
G
U
E
R
A
S
A
N
D
A
L
W
O
O
D
L
N
S
A
B
B
O
T
T
A
V
E
T
E
R
R
A
A
L
T A
D
R
GUERRERO CT
V
A
S
O
N
A
S
T
KEVENAIRE DR
BURLEY DR
M
O
U
L
T
O
N
D
R
LAURYN RIDGE CT
FIELDCREST DR
RUDYARD DR
KENISTON AVE
ACADIA AVE
BLUE SPRUCE WAY
BIXBY DR
L
A
V
E
N
D
E R
L
O
O
P
CREED ST
C
A
L
L
E
D
E
L
S
O
L
HERMINA ST
TICE DR
C A N T O N
D R
F I R T
R
E
E
C
T
S
I
M
A
S
D
R
H
A
Y
C
T
H
A
M
I
L
T
O
N
A
V
E
S
A
N
D
H
U
R
S
T
D
R
T H I S T L E
P
L
A L M A D E N A V E
SUNFLOWER LN
I N C L I N E C
T
CALLE ORIENTE
COSTA ST
BOULDER ST
CHESTNUT AVE
W
H
I
T
C
O
M
B
C
T
S A G E M
E
A
D
O
W
C
T
B
E
L
B
R
O
O
K
W
A
Y
N O R W I C H
A V E
N GADSDEN DR
PRINTY AVE
C E D A R
W A Y
SYLVIA AVE
HOLLY WAY
HORCAJO ST
PARKTOWN PLAZA
PATRICIA CT
M T
S H A S T A
A V E
M
I D
W
I C K D R
STEMEL WAY
P A C H E C O D R
PRADA DR
BARKER ST
M
A
D
A
L
E
N
D
R
U
V
A
S
S
T
TORRES AVE
PASHOTE CT
S GADSDEN DR
PLATT AVE
EAST LN
C H E W
P O
N
A V E
CARNEGIE DR
ROSE DR
S MAIN ST
B
O
L
T
O
N
D
R
ADAMS AVE
H
O
U R E T
D R
TOPAZ ST
T
O
P
H
A
M
C
T
LYNN AVE
DENNIS AVE
NEWBURY ST
D
I
S
C
O
V
E
R
Y
L
N
E
T
H
Y
L
C T
W
O
O
D
W
A
R
D
D
R
GARDEN ST
A
L
V
A
R
E
Z
C T
S
T
R
I
C
K
R
O
T
H
D
R
PINEWOOD WAY
S
T
R
A
T
F
O
R
D
D
R
MCCARTHY RANCH
ALBANY CT
H
A
S
T
I N
G
S
D
R
WILSON WAY
N
I
E
V
E
S
C
T
B R I A N
C
T
O
R
E
G
O
N
W A Y
GLADDING CT
P
O
L
A
R
I S
C
T
A L T A M O
N
T D R
MUSTANG DR
KIRKWALL PL
C H Y S I S R
D
C
H
I
P
M
A
N
D
R
FERREIRA CT
ABERDEEN WAY
S
O
L
A
R
C
T
C
A
R
L
S
B
A
D
S
T
VARGAS CT
ENRIQUEZ CT
BERRYESSA ST
DOLORES DR
DELANO ST
VINEYARD AVE
D O N A H E D R
CHAD DR
K
L
A
M
A
T
H
R
D
C H E R R Y
C
I
R
BUCKEYE CT
CURTNER DR
CADENCE LN
C
O
U
N
T
R
Y
C
L U
B
D
R
N I E V E S
S T
BUTLER ST
CARINO TER
TRAUGHBER ST
BRYCE CT
ARANA CT
CALYPSO LN
PARK WILLOW CT
S U N N Y
H
I L
L
S
C
T
BELLEW DR
PARK BROOK CT
F R A N K
C
T
S E P U L V E D A
A
V
E
NICKLAUS AVE
H
E
M
L
O
C
K
L N
R
I
E
S
L
I
N
G
A
V
E
JOURNEY ST
SUMMERWIND WAY
B
L
U
E
S
P
R
U
C
E
C
T
V
A L L
E
Y
W
A
Y
M A N
Z
A
N
I T
A
C
T
M
A
T
T
E
R
H
O
R
N
C
T
W
E
S
T
R
I
D
G
E
D
R
SILVERA ST
MICHAEL CT
J
U
N
G
F
R
A
U
C
T
SMITHWOOD ST
B
I
G
B
E
A
R
C
T
JUPITER CT
F
O
R
E
S
T
C
T
B
E
R
E
S
F
O
R
D
C
T
M
E
R
Z
C T
W
O
O
D
L
A
N
D
C
T
F O N T A I N B L E U C
T
A R B O
R
W
A
Y
CANTERBURY PL
GROSS ST
LONETREE CT
PERRY ST
J
O
S
H
U
A
T
R
E
E
C
I
R
SHENANDOAH AVE
S
T
E
M
E
L
C
T
SINNOTT LN
SILVERLAKE CT
S A T U
R
N
C
T
T
A
R
O
B
C
T
P A S E O
R E F U G
I O
WOODCOCK CT
F
L
U
M
E
C T
H
O
R
C
A
J
O
C
I
R
J
A
C
K
L
I N
C
I R
GOSSER ST
BERRENDO DR
P
I
N
E
W
O
O
D
C
T
S
A
R
K
C
T
WHITTIER ST
R
A
I
L
R
O
A
D
C
T
TRENTO LN
B A Y B E R R Y
W
A
Y
ALVAREZ CMN
G L E N M O O R
C
I
R
P
A
C
I F I
C
A
W
A
Y
WINSOR ST
TINY ST
AVIAN LN
C
A
M
A
R
I
L
L
O
C
T
S I L V
E
R
T
I P
C
T
WILD ROSE WAY
CARDIFF PL
S
I
N
C
L
A
I
R
F
R
O
N
T
A
G
E
R
D
TECHNOLOGY DR
RANKIN DR
J
A
S
O
N
D
R
ED LEVIN PARK
A N A C A P A
C
T
CENTRE POINTE DR
T
E
R
R
A
C
O
T
T
A
C
T
B
L
E
E
C
K
E
R
S
T
F O U N
D
E
R
S
L
N
CELERITY PL
CLYDE CT
E
C
A
P
I T
O
L
A
V
E
ANN PL
A
A
R
O
N
P
A
R
K
D
R
CASCADE ST
C
O
U
R
T
L
A
N
D
C
T
COFFEE BERRY LN
K
O
V
A
N
D
A
W
A
Y
GLASGOW CT
MONTAGUE CT
D
E
V
O
N
P
L
H
I L
L
V
I E
W
C T
LEVIN ST
D e L O N G L
N
P
R
I N
C
E
S
S
P
L
FALCON DR
P R
A D
A
C
T
PARC PLACE DR
T R O
O
N
C
T
CYPRESS DR
MIHALAKIS ST
BRIDGEWATER LN
G R E E N T R E E W A Y
SPRING VALLEY LN
E X P E D I T I O N
L N
S
T
I R
L
I N
G
D
R
S A N G O
C
T
WOODRUFF WAY
DANIEL CT
LARKSPUR LN
SPRIG CENTER
MANZANO ST
B
E
R
K
S
H I R E
P L
W
E
L
L
I
N
G
T
O
N
D
R
S
E
A
S
I D E D R
WILLOW LN
HEARST DR
C
A
P E L
L
A
W
A
Y
C
R
E
S
C
E
N
T
T
E
R
A L E X
A
N
D
E
R
W
A
Y
E M E R G E N C Y A C C E S S R D
S
A
N
T
O
S
C
T
CALAVERAS CT
K
R
I
S
T
I
N
R
I
D
G
E
W
A
Y
F A I R
H I L L
D R
A
L
D
E
R
D
R
GREENROCK RD
BOND ST
E
V
E
N
I N
G
S
T
A
R
C
T
S
E
R
P
A
D
R
H
I
L
L
T
O
P
C
T
S H
E T L A N D
C T
K
N
O
L
L
V
I
E
W
D
R
SHELLEY CT
L
O
C
H
L
O
M
O
N
D
C
T
C
A
D
I
L
L
A
C
C
T
BARBER CT
PEDRO AVE
O L D
C A L A V E R A S
R D
PARK VIEW DR
BEAUMERE WAY
OLIVER ST
G
I
B
R
A
L
T
A
R
C
T
ELLIS AVE
GLACIER DR
M
A
R
K E T S T
PARK GROVE DR
PARK HEIGHTS DR
C
O
U
R
T
L
A
N
D
A
V
E
BORDER WAY
S
H
I L
L V
I E
W
D
R
H
A
Z
E
L
N
U
T
L
N
CASPER ST
CORINTHIA DR
P
E
C
T
E
N
C
T
C
O
V
E
N
T
R
Y
W
A
Y
VIEW DR
FARMCREST ST
CARL AVE
ELLWELL DR
FINDLEY DR
GIRARD DR
DALTON DR
MOMENTUM DR
CLAUSER DR
TAYLOR DR
VEGAS AVE
VALMY ST
HEFLIN ST
W
A
T
S
O
N
C
T
STULMAN DR
L
A
B
A
R
E
E
D
R
BRALY AVE
LASSEN AVE
M
A
I N
P
L
S
T
A
N
D
R
E W
S
C
T
GOLDEN HILLS DR
LAWTON DR
MURRAY ST
T E R R A
B E L L
A
D
R
L Y
N
W
O
O
D
T
E
R
BEACON DR
GOMES LN
KRISMER ST
BURDETT WAY
C
I
R
O
L
E
R
O
S
T
L A G U N A
D
R
M
I
N
N
I
S
C
I
R
GATES DR
E D G E W
A T
E
R
D
R
FREELAND DR
WILLOW AVE
GEMMA DR
THOMPSON ST
PEPPER PL
ARMAND DR
S H I R L E Y
D
R
CARDOZA LN
HANSON CT
TURQUOISE ST
RIVERA ST
CESTARIC DR
FANYON ST
V
I
S
T
A
R
I
D
G
E
D
R
C
H
U
R
C
H
I
L
L
D
R
BUCKEYE DR
MAPLE AVE
C
A
L
E
R
A
C
R
E
E
K
H
E
I
G
H
T
S
D
R
KIZER ST
UNNAMED ST
B L U E R I D G
E
D
R
WALNUT DR
V
I
D
A
L A
R
G
A
L
O
O
P
COTTONWOOD DR
OLYMPIC DR
CANAL ST
M
A
T
T O
S
D
R
E
V
E
R G R E E N
W A Y
BUSKIRK ST
T A S S A S A R A
D R
CALLAN ST
AYER LN
HAZEN ST
BOYD ST
Q U
I N
C
E
L
N
M
O
O
N
B
E
A
M
W
A
Y
C
L
A
R
I
D
A
D
L
O
O
P
M
O
N
M
O
U
T
H
D
R
BIG BEND DR
R
A
N
C
H
D
R
PETERSBURG DR
BLISS AVE
M
E
N
T
E
L
I N
D
A
L
O
O
P
Y
O
S
E
M
I
T
E
W
A Y
C A N A D A
D R
B
A
Y
V
I E
W
P
A
R
K
D
R
M
O
R
E
T
T
I
L
N
MOONLIGHT WAY
SARATOGA DR
B A R C E L O
N
A
LOOP
S
U
M M E R W I N D D R
WRIGLEY WAY
STARDUST WAY
L O S P O S I T O S
D R
GRAND TETON DR
C
R
E
E
K
S
I
D
E
W
A
Y
SUNRISE WAY
EVERGLADES DR
C
O
Y
O
T
E
S
T
G
R
A
Y
S
O
N
WAY
M
T
R A I N I E R
A V E
C R A T E R
L A K E
A V E
AMES AVE
PORTOLA DR
TERRA VISTA CT
SONOMA DR
HIDDEN CREEK LN
M T
D I A B L O
A V E
RODRIGUES AVE
STELLAR WAY
F A I R V I E W
W
A
Y
D E S E R T H O L L Y S
T
T
R
E
N
T
O
L
O O P
FERNLEAF DR
G
I
B
R
A
L
T
A
R
D
R
A L C O S T A
D R
ELDERBERRY DR
S E L W
Y N
D
R
CALERO ST
SEACLIFF DR
L A S L O M A S
D R
SHILOH AVE
PARVIN DR
V A L E N C I A D R
E
L K
W
O
O
D
D
R
SYCAMORE DR
TAHOE DR
BUTANO DR
THOMPSON CT
M
E A D O W
L A N D
D
R
WOOL DR
G
R
E
A
T
H
O
U
S
E
D
R
C
A
L
A
D
E
N
I
A
L
N
P E B B L E B E A C
H
C
T
VISTA WAY
L
E
X
I
N
G
T
O
N
S
T
SANDISK DR
CENTRIA LN
M E R I D
I A
N
P
L
A
L
V
I S
O
-
M
I
L
P
I
T
A
S
R
D
AMALFI LOOP
LACEY DR
N
M
C
C
A
R
T
H
Y
B
L
V
D
MACHADO AVE
C O
B B L E S
T
O
N
E
L O
O
P
PUD 11
PUD 71
PUD 55
PUD 20
PUD 37
PUD 20-A
PUD 45
PUD 48
PUD
39 PUD 10
PUD 64
PUD 50
PUD 60
PUD 18-A
PUD 47
PUD 18-A
PUD 8-A
PUD 26
PUD 44
PUD 43
PUD 19
PUD 74
PUD 6
PUD 77
PUD 23.5
PUD 69
PUD 36
PUD 33
PUD 9
PUD 42
PUD 58
PUD 12 PUD 25
PUD 68
PUD 32
PUD 21
PUD 8-A
PUD 18
PUD 54
PUD 14
PUD 34
PUD 17
PUD 22
PUD 62
PUD 5E-1
PUD 5-B
PUD 40
PUD 5
PUD 5
PUD 27
PUD 51
PUD 35
PUD 5-B
PUD 23
PUD 75
PUD 47
PUD 76
PUD 57
PUD 31
PUD 72
PUD 78
PUD 82
PUD 80
PUD
79 PUD
PD18-0001
VP 2
VP 3
VP 4
VP 5
VP 6
VP 7
VP 8
Zones
Single-Family minimum lot size 2,500 s.f. (R1-2.5)
Single-Family minimum lot size 3,000 s.f. (R1-3)
Single-Family minimum lot size 4,000 s.f. (R1-4)
Single-Family minimum lot size 5,000 s.f. (R1-5)
Single-Family minimum lot size 6,000 s.f. (R1-6)
Single-Family minimum lot size 10,000 s.f. (R1-10)
Single-Family with Hillside Combining District (R1-H)*
One or Two-Family (R2)
Multi-Family (R3)
Multi-Family Very High Density (R4)
Mobile Home Park (MHP)
Mixed Use (MXD)
Very High Density Mixed Use (MXD3)
Town Center (TC)
Town Center (TC1)
Town Center (TC2)
Town Center (TC3)
Neighborhood Commercial Mixed Use (NCMU1)
Neighborhood Commercial Mixed Use (NCMU2)
Neighborhood Commercial Mixed Use (NCMU3)
Administrative and Professional Office (CO)
Neighborhood Commercial (C1)
General Commercial (C2)
Highway Services (HS)
Light Industrial (M1)
Heavy Industrial (M2)
Industrial Park (MP)
Business Park Research & Development (BPRD)
Institutional (I)
Agricultural (A)
Park and Open Space (POS)
Waterway
Milpitas Metro Specific Plan Zones
Metro Multi-Family High Density Residential (R3-Metro)
Metro Multi-Family Very High Density Residential (R4-Metro) Metro Urban Residential (R5-Metro)
Metro High Density Mixed Use (MXD2-Metro)
Metro Very High Density Mixed Use (MXD3-Metro)
Metro Business Park Research & Development, Limited Residential (BPRD-R-Metro) Metro Business Park Research & Development (BPRD-Metro) See Milpitas Gateway-Main St. Specific Plan for zones
Overlay
Freeway Corridor Overlay (FC)
TOD Overlay
Tier 1 - Half Mile
Tier 1 - Quarter Mile
Tier 1 - 200ft
Tier 2 - Half Mile
Tier 2 - Quarter Mile
Tier 2 - 200ft
Other Features
Planned Unit Development (PUD)
Precise Plan Area of the Midtown Specific Plan
Midtown Specific Plan Area
Metro Specific Plan Area
City Boundary
Parcels
Crestline
View Points
0 0.5 1
Miles
/
May 2026
ZONING MAP WITH TOD OVERLAY
CITY OF MILPITAS
§¨¦
880
§¨¦
880
§¨¦
680
§¨¦
680
*Note: The "H" Hillside Combining District is mapped as R1-H. The Site and Architectural (S) Overlay was adopted through a voter initiative and is not currently mapped on any parcel.
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Conduct a Public Hearing and Consider Introducing an Ordinance Adding a New Section to Title XIII, Chapter B.20 of the Milpitas Municipal Code to Create a Transit-Oriented Development Overlay Zoning District to Implement Senate Bill 79 Development Standards (Staff Contact: Jay Lee, Planning Director, 408- 586-3073)
Category: Public Hearings-Community Development
Meeting Date: 5/19/2026
Recommendation: Conduct a public hearing and determine that the ordinance is statutorily exempt from the California Environmental Quality Act (CEQA) under Government Code Section 65912.160(c)(2) and introduce an Ordinance adding a new section to Title XIII, Chapter B.20 of the Milpitas Municipal Code to create a Transit-Oriented Development Overlay (TOD) zoning district and regulations implementing Senate Bill 79 development standards (P-ZA26-0002).
BACKGROUND:
Senate Bill 79 (SB 79), the Abundant and Affordable Homes Near Transit Act, was signed by Governor Newsom on October 10, 2025, establishes new statewide requirements for the approval of transit-oriented housing developments near major transit stops, with the intent to increase housing production and promote sustainable, transit-accessible communities. SB 79 adds Sections 65912.155 et seq. to the California Government Code, setting forth eligibility criteria, development standards, and streamlined approval processes for qualifying projects within designated proximity to transit facilities. The law becomes operative on July 1, 2026, and preempts local zoning and development standards that are inconsistent with its provisions, unless a city adopts local implementing regulations that are consistent with SB 79. Table 1 outlines those minimum standards.
The City of Milpitas has three major transit stops and approximately 3,500 properties that would be impacted by SB 79. SB 79 defines a specific type of transit stop called a “transit-oriented development (TOD) stop” segregated into two tiers. Typically, a TOD stop is a major transit station served by heavy rail, high, or very high frequency rail, light rail, or bus rapid transit with a dedicated lane. Table 2 outlines the three major transit stops and their applicable Tier.
Table 1: Development Standards under SB 79
Distance Tier 1 Tier 2
Adjacent to TOD stop
(within 200 feet of
pedestrian access point)
Max. Height: 95 feet
Min. Density: 30 du/ac
Max. Density: 160 du/ac
Max. Residential FAR: 4.5
Max. Height: 85 feet
Min. Density: 30 du/ac
Max. Density: 140 du/ac
Max. Residential FAR: 4.0
¼-mile from TOD stop Max. Height: 75 feet
Min. Density: 30 du/ac
Max. Density: 120 du/ac
Max. Residential FAR: 3.5
Max. Height: 65 feet
Min. Density: 30 du/ac
Max. Density: 100 du/ac
Max. Residential FAR: 3.0
½-mile from TOD stop Max. Height: 65 feet
Min. Density: 30 du/ac
Max. Density: 100 du/ac
Max. Residential FAR: 3.0
Max. Height: 55 feet
Min. Density: 30 du/ac
Max. Density: 80 du/ac
Max. Residential FAR: 2.5
Table 2: Tiers of Transit-Oriented Development Stops in Milpitas Tier Types of Transit Applied to Milpitas
Tier 1 Heavy Rail
Very high frequency
commuter rail
Milpitas Transit Center
(BART)
Tier 2 Light Rail Transit
High-frequency commuter rail
Bus Rapid Transit (BRT)
VTA Great Mall Light
Rail Station
VTA Alder Light Rail
Station
Local governments are authorized to adopt local ordinances to implement the statute as provided in California Government Code Section 65912.160.
On April 22, 2026, staff presented the draft zoning ordinance text and map amendment (P-ZA26-0002) implementing SB 79 to the Planning Commission. The Planning Commission voted unanimously (6-0; Commissioner Brown absent) to adopt Resolution No. 26-008, recommending that the City Council adopt the zoning ordinance text and map amendment (P-ZA26-0002) implementing SB 79, however the Commission provided feedback regarding the possibility of increasing densities.
ANALYSIS:
The City of Milpitas has demonstrated its long-standing policy for higher density housing development in its areas served by transit. Since 2002, the City has adopted two Specific Plans (Gateway-Main Street, formerly the Midtown Specific Plan, and Milpitas Metro, formerly Transit Area Specific Plan) that have all increased density around the Tier 1 and Tier 2 TOD Zones. The Metro plan already permits densities in line with SB 79.
The area surrounding the Milpitas Transit Center (Tier 1) is zoned MXD3-Metro and allows residential density up to 250 du/acre and building heights up to 275 feet. Moreover, many of the properties immediately adjacent to the Milpitas Transit Center have already been redeveloped with multi-family residential. The Gateway Plan permits densities ranging from 12 to 65 du/acre in the half-mile area surrounding the Great Mall Light Rail Station (Tier 2). Under SB 79, these parcels could be eligible for additional density. However, many of the properties immediately adjacent to the Great Mall Light Rail Station have also been redeveloped with multi- family residential.
Although many areas eligible for SB 79 have been recently redeveloped due to the City’s Specific Plan efforts, the proposed ordinance amendment would implement the minimum densities and height maximums under SB 79 and establish residential development standards for sites that are not zoned for residential development but subject to SB 79.
Proposed Amendments to the Zoning Ordinance
Based on feedback from the Planning Commission at its April 22, 2026 meeting and to better align with the State’s goals for transit-oriented development, staff amended the development standards to increase the minimum allowable densities across both Tiers. The applicable development standards have also been changed to better match the densities. The new minimum densities and standards are shown in Table 3.
The proposed ordinance implements SB 79 and includes the following amendments to Title XIII of the Milpitas Municipal Code (MMC):
• Add subsection B.20.040 Transit-Oriented Development Overlay Zone to Chapter B.20 Overlay Zones and Standards to implement California Government Code Sections 65912.155 through 65912.162 (SB 79). Specifically, it establishes the applicability of the TOD overlay under SB 79, incorporates the relevant definitions under the Government Code, and sets forth the minimum residential and height standards for qualifying housing projects.
• Specifically, the following development standards will apply:
Table 3: Transit-Oriented Development (-TOD) Overlay Zone Development Standards
Distance Tier 1 Tier 2
Adjacent to TOD stop (within
200 feet of pedestrian access
point)
Maximum Height: 95 feet
Minimum Density: 60 du/ac
Maximum Density: 160 du/ac
Maximum Residential FAR:
4.5 Maximum Height: 85 feet
Minimum Density: 60 du/ac
Maximum Density: 140 du/ac
Maximum Residential FAR:
4.0 ¼-mile from TOD stop Maximum Height: 75 feet
Minimum Density: 60 du/ac
Maximum Density: 120 du/ac
Maximum Residential FAR:
3.5 Maximum Height: 65 feet
Minimum Density: 60 du/ac
Maximum Density: 100 du/ac
Maximum Residential FAR:
3.0 ½-mile from TOD stop Maximum Height: 65 feet
Minimum Density: 60 du/ac
Maximum Density: 100 du/ac
Maximum Residential FAR:
3.0 Maximum Height: 55 feet
Minimum Density: 50 du/ac
Maximum Density: 80 du/ac
Maximum Residential FAR:
2.5 • Projects will be required to follow all other development standards as specified for in the R4-Metro and R5-Metro zoning districts.
• For parcels zoned R1-6 (single-family residential), a qualifying housing project will be subject to a minimum density of 30 du/acre and must follow all other development standards as specified under the R4 zoning district.
Proposed Amendments to the Zoning Map
The proposed zoning map amendment is a critical component of the ordinance to implement Senate Bill 79 (SB 79) and ensure compliance with state requirements for transit-oriented development. Following the publication of Planning Commission materials, the Metropolitan Transportation Commission (MTC) and the Santa Clara Valley Transportation Authority (VTA) released draft SB 79 Transit-Oriented Development (TOD) maps that incorporated updated methodologies, including the use of pedestrian access point data for major transit stops. This new information provided a more precise delineation of the half-mile areas around each transit stop, as required by SB 79, and allowed for a more accurate identification of eligible parcels.
In response to these regional mapping updates, City staff reviewed and revised the proposed TOD Overlay boundaries to align with the latest MTC and VTA methodologies. The updated map now reflects the most current and accurate data regarding pedestrian access points and walkable routes to transit, ensuring that the overlay applies only to parcels that are truly within a half-mile walking distance of the designated major transit stops, as defined by state law. This approach is consistent with the intent of SB 79 to promote equitable and effective transit-oriented housing development and to avoid over- or under-inclusion of parcels based on outdated or less precise mapping techniques.
The proposed zoning map amendment (Attachment A – Exhibit 1) will implement the Transit-Oriented Development (-TOD) Overlay on the City’s Zoning Map, enacted by Title XIII, Chapter A, Section 2.060 of the Milpitas Municipal Code. The TOD Overlay will apply to all parcels within the updated half-mile areas surrounding the three major transit stops, as defined by Senate Bill 79 and the implementing ordinance.
General Plan Conformance
The City’s General Plan is the primary long-range planning document that provides the vision for the future growth and development of Milpitas. The proposed zoning text and map amendments implementing SB 79 conform to the policies and standards in the City’s General Plan, as demonstrated in the following table:
Table 4: General Plan Consistency
Policy / Actions Conformance
Implementation
Policy IM 1-2:
Require the City’s Zoning Ordinance,
planning documents, master plans,
infrastructure projects, and development
projects to be consistent with the General
Plan and State law.
Consistent. This zoning ordinance and map
amendment will implement recent legislation
(SB 79) and bring the Zoning Ordinance into
conformance with state housing law.
Land Use Element
Policy LU 2-3:
Allow densities and intensities which exceed
the generally allowed ranges defined by the
underlying land use for projects utilizing
Density Bonus provisions including bonuses
for senior housing, affordable housing, and
for projects within designated overlay
districts.
Consistent. The intent of SB 79 is to build
more homes near transit to reduce housing
and transportation costs for California families
and promote environmental sustainability,
economic growth, and reduce traffic
congestion. Implementing the TOD Overlay
District will not only bring the Zoning
Ordinance into conformance with state law but
also permit a greater variety of housing types
in densities in areas close to major transit
stops.
Land Use Element
Policy LU 2-2:
Continue to utilize Overlay Zoning Districts
as needed to supplement land use and
zoning standards with additional allowances
and regulations that reflect and use and
policy objectives for a particular area.
Consistent. The intent of SB 79 is to build
more homes near transit to reduce housing
and transportation costs for California families
and promote environmental sustainability,
economic growth, and reduce traffic
congestion. Implementing the TOD Overlay
District will not only bring the Zoning
Ordinance into conformance with state law but
also permit a greater variety of housing types
in densities in areas close to major transit
stops.
Land Use Element
Policy LU 3-2:
Continue to utilize planning tools (including
specific plans and overlay districts) that
promote transit-oriented and mixed-use
development objectives near the Milpitas
Transit Center.
Consistent. The TOD Overlay District will
coincide with regional efforts and conform with
state law to allow higher densities near transit
and specifically continue to promote housing
near the Milpitas Transit Center.
Specific Plan Conformance
The proposed zoning ordinance and map amendments are in both the Milpitas Metro (Metro) Specific Plan and Gateway-Main Street (Gateway) Specific Plan area. These designations provide for high-density and medium- density residential uses. As demonstrated in Table 5, the proposed zoning ordinance and map amendments are consistent with the applicable Metro and Gateway-Main Street Specific Plan land use policies.
Table 5: Metro and Gateway-Main Street Specific Plan Consistency
Policy Conformance
Metro Specific Plan Land Use
Policy LU2:
Capitalize on the transit orientation of the
Plan Area to support transit ridership,
reduce traffic congestion and greenhouse
gas emissions, and support livability.
Consistent. The core of the Metro Plan
Vision is to create a complete and unique
urban neighborhood. The TOD Overlay
District will not only conform with state law to
allow higher densities near transit but also
specifically continue to promote a variety of
housing near the Milpitas Transit Center.
Metro Specific Plan Land Use
Policy LU3:
Provide transit-oriented housing that is
accessible and affordable for a range of
household types and income levels.
Consistent. The TOD Overlay District will not
only conform with state law to allow higher
densities near transit but also specifically
continue to promote a variety of housing near
the Milpitas Transit Center.
Gateway-Main Street Specific Plan
Guiding Principle:
Integrate a mix of housing types, scales, and
affordability, including mixed-use, housing
for families, smaller unit homes, live-work,
senior housing, and affordable housing.
Consistent. While the proposed zoning map
and text amendment would only affect the
southern end (South of O’Toole Elms Park to
Curtis Avenue) of the Main Street District,
South Railyards District, Elmwood District,
and the Curtis neighborhood of the Gateway
Plan, the TOD Overlay District will help
implement the Plan’s vision of Main Street as
a walkable, mixed-use urban village
accessible from the surrounding community.
The TOD Overlay District will allow higher
densities near the Great Mall Light Rail
Station, which will continue to facilitate a
variety of housing types at different
affordability levels near transit.
Findings for Approval
The City Council shall consider the following findings in considering approval of a zoning ordinance amendment:
Zoning Ordinance Text and Map Amendments (Milpitas Municipal Code Section XIII, Chapter D.6.050) a. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of the General Plan.
The proposed text and map amendments are specifically consistent with General Plan Policy IM 1- 2, which states to require the City’s Zoning Ordinance, planning documents, master plans, infrastructure projects, and development projects to be consistent with the General Plan and State law. This zoning ordinance and map amendment will implement recent legislation (SB 79) and bring the Zoning Ordinance into conformance with state housing law. The proposed text and map amendments are also consistent with General Plan Policy LU2-3, which states to allow densities and intensities which exceed the generally allowed ranges defined by the underlying land use for projects utilizing Density Bonus provisions including bonuses for senior housing, affordable housing, and for projects within designated overlay districts, as well as General Plan Policy LU2-2, which states to continue to utilize Overlay Zoning Districts as needed to supplement land use and zoning standards with additional allowances and regulations that reflect and use and policy objectives for a particular area. The intent of SB 79 is to build more homes near transit to reduce
housing and transportation costs for California families and promote environmental sustainability, economic growth, and reduce traffic congestion. Implementing the TOD Overlay District will not only bring the Zoning Ordinance into conformance with state law but also permit a greater variety of housing types in densities in areas close to major transit stops. The proposed text and map amendments are also consistent with General Plan Policy LU3-1, which states to support regional efforts that promote higher densities near major transit and travel facilities, and reduce regional vehicle miles traveled by supporting active modes of transportation including walking, biking, and public transit; support local and regional land use decisions that promote safe access to and the use of alternatives to auto transit, as well as General Plan Policy LU3-2, which states to continue to utilize planning tools (including specific plans and overlay districts) that promote transit-oriented and mixed-use development objectives near the Milpitas Transit Center. The TOD Overlay District will coincide with regional efforts and conform with state law to allow higher densities near transit and specifically continue to promote housing near the Milpitas Transit Center.
b. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of any Specific Plan, if applicable;
The proposed zoning text and map amendments are consistent with and conform to the goals and policies of the Milpitas Metro Specific Plan (Metro). The core of the Metro Plan Vision is to create a complete and unique urban neighborhood. The proposed zoning text and map amendments are specifically consistent with Metro Specific Plan Land Use Policy LU2 (Transit Orientation), which states to capitalize on the transit orientation of the Plan Area to support transit ridership, reduce traffic congestion and greenhouse gas emissions, and support livability, and LU3 (Housing Diversity and Affordability), which states to provide transit-oriented housing that is accessible and affordable for a range of household types and income levels. The TOD Overlay District will not only conform with state law to allow higher densities near transit but also specifically continue to promote a variety of housing near the Milpitas Transit Center. The proposed zoning text and map amendments are also consistent with and conform to the goals and policies of the Gateway-Main Street Specific Plan (Gateway). While the proposed zoning map and text amendment would only affect the southern end (South of O’Toole Elms Park to Curtis Avenue) of the Main Street District, South Railyards District, Elmwood District, and the Curtis neighborhood of the Gateway Plan, the TOD Overlay District will help implement the Plan’s vision of Main Street as a walkable, mixed-use urban village accessible from the surrounding community. One of the guiding principles of the Gateway Plan is to integrate a mix of housing types, scales, and affordability, including mixed-use, housing for families, smaller unit homes, live-work, senior housing, and affordable housing. The TOD Overlay District will allow higher densities near the Great Mall Light Rail Station, which will continue to facilitate a variety of housing types at different affordability levels near transit.
c. The proposed Zoning Amendment will not adversely affect the public health, safety and welfare;
The proposed zoning text and map amendments will not be detrimental to the public interest, health, safety, convenience, and general welfare, because the action would allow varying residential densities in the TOD Overlay District that are consistent with State law and bring the overall Zoning Ordinance into conformance with State law. They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development.
Moreover, the City retains authority through any future discretionary approvals to address project- specific health, safety, and welfare concerns in the TOD Overlay District.
d. The proposed Zoning Amendment is in compliance with the provisions of California Environmental Quality Act;
The proposed zoning text and map amendments are not a project under CEQA pursuant to Government Code Section 65912.160(c)(2). Adoption of the ordinance is a statutory implementation action.
e. When considering a reduction of residential density, ensure compliance with California Government Code section 65863 by either finding that the remaining sites identified in the Housing Element are adequate to accommodate the City’s share of the regional housing need or by identifying sufficient additional, adequate, and available sites with an equal or greater density so that there is no net loss in residential density; and
This finding is not applicable. The zoning text and map amendments are not reducing residential density.
f. The proposed Zoning Amendment would not result in a net loss of potential housing units.
The proposed Zoning Amendment would not result in a net loss of potential housing, as the Project amends the Zoning Ordinance to allow for qualifying housing projects in transit-oriented development zones pursuant to State law (SB 79).
g. The proposed Zoning Amendment is internally consistent with other applicable provisions of this Title
The proposed Zoning Ordinance Text Amendment is instituting changes to the Zoning Ordinance that reflect and conform with recent State law (SB 79). The purpose of the Zoning Ordinance is to promote public health, safety, comfort, and general welfare, and to enable appropriate and orderly development. More specifically, the Zoning Ordinance was adopted to provide standards for orderly growth and development of the city, and guide and control the use of land to provide a safe, harmonious, attractive, and sustainable community, as well as achieve the arrangement of land uses depicted in the General Plan, consistent with the goals and policies of the General Plan. The proposed zoning text amendment will create a Transit-Oriented Development Overlay District that will specifically apply to qualifying housing projects within a half mile of qualifying transit-oriented development stops. The amendments are consistent with the Zoning Ordinance as a whole and do not create any internal inconsistencies.
h. The affected site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed new zone; and
The proposed Zoning Map Amendment is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed zone. The TOD Overlay would simply bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
i. If located within or adjacent to residential areas, the requested zone change is compatible with the character of the residential neighborhood.
The proposed zoning map amendment would create a TOD Overlay District in the half mile areas around three transit-oriented development stops within the City. The proposed map amendment is generally compatible with the character of the residential neighborhoods. The TOD Overlay would bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit- oriented development in appropriate areas, which would serve to advance numerous City goals
related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
POLICY ALTERNATIVE(S):
Alternative 1: Do not adopt the Ordinance.
Pros: None
Cons: If the City does not adopt an ordinance, the City would forgo the opportunity to provide local clarity application procedures, design standards, and other implementation details that are not specified in state law.
It would also increase the likelihood that projects will be approved under state default standards, which may not align with the City’s adopted planning objectives, specific plan policies, or community design preferences.
Reason for Not Recommending: This alternative is not recommended because the absence of a local implementing ordinance could undermine established policy goals related to housing quality, affordability, and neighborhood compatibility, and would forfeit the City’s opportunity to maintain consistency with its General Plan and specific plans. Adopting a local ordinance enables the City to provide a clear, objective, and locally tailored regulatory framework while maintaining compliance with state law.
PROJECT SCHEDULE/KEY MILESTONES
The following timeline outlines the key steps for implementation:
• May 19, 2026: City Council consideration and potential adoption of the urgency ordinance. • Immediate: Ordinance becomes effective upon adoption by a four-fifths vote, ensuring no lapse in local regulatory authority.
• May 19, 2026: City Council consideration and potential adoption of the permanent ordinance. • May–June 2026: Publication and posting of the adopted ordinance in accordance with Government Code Section 36933.
• June 2, 2026: City Council consideration and potential second reading of the permanent ordinance. • July 1, 2026: SB 79 becomes operative statewide; City’s urgency ordinance ensures local standards remain in effect.
• July 2, 2026: Potential permanent ordinance goes into effect and the urgency ordinance is automatically repealed.
FISCAL IMPACT:
There is no direct fiscal impact associated with adoption of the proposed ordinance. Any administrative costs associated with ordinance adoption and California Department of Housing and Community Development (HCD) coordination would be absorbed within existing departmental resources.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
The proposed ordinance is statutorily exempt from the California Environmental Quality Act (CEQA) under Government Code Section 65912.160(c)(2). This is an ordinance that is implementing Senate Bill 79.
ATTACHMENT(S):
(a) Draft Ordinance (with Exhibit 1: Zoning Map Amendment) (b) Planning Commission Staff Report
(c) Planning Commission Resolution No. 26-008
(d) Planning Commission Meeting Minutes for April 22, 2026
1 Ordinance No. 38.861
REGULAR
NUMBER: 38.861
TITLE: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MILPITAS
AMENDING THE ZONING MAP AND MILPITAS MUNICIPAL CODE
TITLE XIII, CHAPTER B.20, TO ADD THE TRANSIT-ORIENTED
DEVELOPMENT OVERLAY DISTRICT AND REGULATIONS
IMPLEMENTING SENATE BILL 79 DEVELOPMENT STANDARDS.
HISTORY: This Ordinance was introduced (first reading) by the City Council at its meeting of ____________________, upon motion by_________________________ and was adopted (second reading) by the City Council at its meeting of _______________, upon motion by ____________________________. The Ordinance was duly passed and ordered published in accordance with law by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: APPROVED:
________________________________ ______________________________ Suzanne Guzzetta, City Clerk Carmen Montano, Mayor
APPROVED AS TO FORM:
________________________________________
Christian M. Curtis, City Attorney
2 Ordinance No. 38.861
RECITALS AND FINDINGS:
WHEREAS, Senate Bill 79 (“SB 79”) was signed on October 10, 2025, and codified as California Government Code Sections 65912.155 et seq., and states, among other things, that notwithstanding local law to the contrary, a housing development project, as defined, within a specified distance of a transit oriented development stop, as defined, is an allowed use as a transit-oriented housing development on any site zoned for residential, mixed, or commercial development, if the development complies with applicable requirements, as specified; and WHEREAS, SB 79 is anticipated to affect development near three (3) transit-oriented development stops within Milpitas; and
WHEREAS, California Government Code Sections 65300 et seq. require each city to prepare and adopt a comprehensive, long-term general plan for the physical development of the county or city; and
WHEREAS, on March 9, 2021, the Milpitas City Council adopted the Milpitas 2040 General Plan, updating and revising the land use policies, goals, and objectives contained in the City’s previous General Plan; and
WHEREAS, on September 2, 2025, the Milpitas City Council adopted a comprehensive update to the zoning ordinance, including the addition of a new Title XIII – Zoning to the Milpitas Municipal Code and amendments to various other sections of the Municipal Code for consistency with the updated Zoning Ordinance and amended the Zoning Map of the City of Milpitas to achieve consistency between the updated Zoning Ordinance and Zoning Map; and WHEREAS, pursuant to the City’s General Plan and the implementing Zoning Ordinance, the following zoning districts allow residential, mixed, or commercial development:
General Commercial (C2), Metro Business Park Research and Development – Limited Residential (BPRD-R-Metro), Metro Multi-Family High Density Residential (R3-Metro), Metro Multi-Family Very High Density Residential (R4-Metro), Metro Urban Residential (R5-Metro), Metro High Density Mixed Use (MXD2-Metro), Metro Very High Density Mixed Use (MXD3- Metro), Multi-Family (R3), Multi-Family Very High Density (R4), Single-Family (R1), Mixed Use (MXD), and Main Street Mixed-Use (MS-MU); and
WHEREAS, pursuant to the City’s General Plan and the implementing Zoning Ordinance, the following zoning districts are not zoned for residential, mixed, or commercial development: Heavy Industrial (M2), Institutional (I), Park and Public Open Space (POS), Business Park Research and Development (BPRD), and Metro Business Park Research and Development (BPRD-Metro). The City Council finds and determines that it is not and was not its intent to zone properties in these districts for residential, mixed, or commercial development and that any residential, mixed, or commercial use allowed in these zones is incidental and neither determinative nor reflective of the purpose for which these properties were zoned; and WHEREAS, California Government Code Section 65912.160 provides that a local government may enact an ordinance to make its zoning code consistent with SB 79 and that such an ordinance is not considered a project subject to environmental review pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code (the California Environmental Quality Act or “CEQA”); and
3 Ordinance No. 38.861
WHEREAS, without waiving its objection to the California Legislature’s ill-conceived decision to override local control and planning, the City wishes to enact this ordinance to regulate the development that SB 79 permits; and
WHEREAS, consistent with California Government Code Section 65912.160(d), at least 14 days prior to the adoption of this ordinance, the City submitted a draft of this ordinance to the California Department of Housing and Community Development (“HCD”) and received and acted upon any feedback received from HCD; and
WHEREAS, the Planning Commission is an advisory body to the City Council; and WHEREAS, the City Council is the final authority on General Plan, Specific Plan, and Zoning amendments, including amendments to the Land Use Map and Zoning Map; and WHEREAS, on April 22, 2026, the Planning Commission held a duly noticed public hearing and having duly considered testimony and written materials provided recommended the adoption of this ordinance to the City Council; and
WHEREAS, on May 19, 2026, the City Council held a lawfully-noticed public hearing and after considering all testimony and written materials provided in connection with that hearing introduced this ordinance and waived the reading thereof; and WHEREAS, all prerequisites for the adoption of this ordinance have been met.
NOW, THEREFORE, the City Council of the City of Milpitas does ordain as follows:
SECTION 1. RECORD AND BASIS FOR ACTION
The City Council has duly considered the full record before it, which may include but is not limited to such things as the City staff report, testimony by staff and the public, and other materials and evidence submitted or provided to the City Council. Furthermore, the recitals set forth above are found to be true and correct and are incorporated herein by reference.
SECTION 2. ZONING ORDINANCE TEXT AND MAP AMENDMENT
FINDINGS (XIII-D.6.050)
The City Council makes the following findings based on the evidence in the public record in support of Zoning Amendment No. ZA26-0002:
a. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of the General Plan;
The proposed text and map amendments are specifically consistent with General Plan Policy IM 1-2, which states to require the City’s Zoning Ordinance, planning documents, master plans, infrastructure projects, and development projects to be consistent with the General Plan and State law. This zoning ordinance and map amendment will implement recent legislation (SB 79) and bring the Zoning Ordinance into conformance with state housing law. The proposed text and map amendments are also consistent with General Plan Policy LU2-3, which states to allow densities and intensities which exceed the generally allowed ranges defined by the underlying land use for projects utilizing Density Bonus provisions including bonuses for senior housing, affordable housing, and for projects within designated
4 Ordinance No. 38.861
overlay districts, as well as General Plan Policy LU2-2, which states to continue to utilize Overlay Zoning Districts as needed to supplement land use and zoning standards with additional allowances and regulations that reflect and use and policy objectives for a particular area. The intent of SB 79 is to build more homes near transit to reduce housing and transportation costs for California families and promote environmental sustainability, economic growth, and reduce traffic congestion.
Implementing the TOD Overlay District will not only bring the Zoning Ordinance into conformance with state law but also permit a greater variety of housing types in densities in areas close to major transit stops. The proposed text and map amendments are also consistent with General Plan Policy LU3-1, which states to support regional efforts that promote higher densities near major transit and travel facilities, and reduce regional vehicle miles traveled by supporting active modes of transportation including walking, biking, and public transit; support local and regional land use decisions that promote safe access to and the use of alternatives to auto transit, as well as General Plan Policy LU3-2, which states to continue to utilize planning tools (including specific plans and overlay districts) that promote transit-oriented and mixed-use development objectives near the Milpitas Transit Center. The TOD Overlay District will coincide with regional efforts and conform with state law to allow higher densities near transit and specifically continue to promote housing near the Milpitas Transit Center.
b. The proposed Zoning Amendment is consistent with and conforms to the goals and policies of any Specific Plan, if applicable;
The proposed zoning text and map amendments are consistent with and conform to the goals and policies of the Milpitas Metro Specific Plan (Metro). The core of the Metro Plan Vision is to create a complete and unique urban neighborhood. The proposed zoning text and map amendments are specifically consistent with Metro Specific Plan Land Use Policy LU2 (Transit Orientation), which states to capitalize on the transit orientation of the Plan Area to support transit ridership, reduce traffic congestion and greenhouse gas emissions, and support livability, and LU3 (Housing Diversity and Affordability), which states to provide transit-oriented housing that is accessible and affordable for a range of household types and income levels. The TOD Overlay District will not only conform with state law to allow higher densities near transit but also specifically continue to promote a variety of housing near the Milpitas Transit Center. The proposed zoning text and map amendments are also consistent with and conform to the goals and policies of the Gateway-Main Street Specific Plan (Gateway). While the proposed zoning map and text amendment would only affect the southern end (South of O’Toole Elms Park to Curtis Avenue) of the Main Street District, South Railyards District, Elmwood District, and the Curtis neighborhood of the Gateway Plan, the TOD Overlay District will help implement the Plan’s vision of Main Street as a walkable, mixed-use urban village accessible from the surrounding community. One of the guiding principles of the Gateway Plan is to integrate a mix of housing types, scales, and affordability, including mixed-use, housing for families, smaller unit homes, live-work, senior housing, and affordable housing. The TOD Overlay District will allow higher densities near the Great Mall
5 Ordinance No. 38.861
Light Rail Station, which will continue to facilitate a variety of housing types at different affordability levels near transit.
c. The proposed Zoning Amendment will not be detrimental to the public interest, health, safety, convenience, and general welfare;
The proposed zoning text and map amendments will not be detrimental to the public interest, health, safety, convenience, and general welfare, because the action would allow varying residential densities in the TOD Overlay District that are consistent with State law and bring the overall Zoning Ordinance into conformance with State law. They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. Moreover, the City retains authority through any future discretionary approvals to address project- specific health, safety, and welfare concerns in the TOD Overlay District.
d. The proposed Zoning Amendment is in compliance with the provisions of California Environmental Quality Act;
The proposed zoning text and map amendments are not a project under CEQA pursuant to Government Code Section 65912.160(c)(2). Adoption of the ordinance is a statutory implementation action.
e. When considering a reduction of residential density, ensure compliance with California Government Code Section 65863 by either finding that the remaining sites identified in the Housing Element are adequate to accommodate the City’s share of the regional housing need or by identifying sufficient additional, adequate, and available sites with an equal or greater density so that there is no net loss in residential density;
This finding is not applicable. The zoning text and map amendments are not reducing residential density.
f. The proposed Zoning Amendment would not result in a net loss of potential housing units;
The proposed Zoning Amendment would not result in a net loss of potential housing, as the Project amends the Zoning Ordinance to allow for qualifying housing projects in transit-oriented development zones pursuant to State law (SB 79).
g. The proposed Zoning Ordinance Text Amendment is internally consistent with other applicable provisions of this Title;
The proposed Zoning Ordinance Text Amendment is instituting changes to the Zoning Ordinance that reflect and conform with recent State law (SB 79). The purpose of the Zoning Ordinance is to promote public health, safety, comfort, and
6 Ordinance No. 38.861
general welfare, and to enable appropriate and orderly development. More specifically, the Zoning Ordinance was adopted to provide standards for orderly growth and development of the city, and guide and control the use of land to provide a safe, harmonious, attractive, and sustainable community, as well as achieve the arrangement of land uses depicted in the General Plan, consistent with the goals and policies of the General Plan. The proposed zoning text amendment will create a Transit-Oriented Development Overlay District that will specifically apply to qualifying housing projects within a half mile of qualifying transit-oriented development stops. The amendments are consistent with the Zoning Ordinance as a whole and do not create any internal inconsistencies.
h. The affected site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed new zone; and
The proposed Zoning Map Amendment is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle access and public services and utilities, to accommodate the uses and development densities or intensities allowed in the proposed zone. The TOD Overlay would simply bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If the projects are eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
i. If located within or adjacent to residential areas, the requested zone change is compatible with the character of the residential neighborhood.
The proposed zoning map amendment would create a TOD Overlay District in the half mile areas around three transit-oriented development stops within the City. The proposed map amendment is generally compatible with the character of the residential neighborhoods. The TOD Overlay would bring the Zoning Ordinance and Map into conformance with development density ranges into consistency with State law (SB 79). They would help facilitate new, higher density and transit-oriented development in appropriate areas, which would serve to advance numerous City goals related to community design, environment, and economic development. The TOD Overlay would also establish residential development standards for sites that are not zoned for residential development but subject to SB 79. Moreover, the City retains authority through any future discretionary approvals to address project-specific health, safety, and welfare concerns in the TOD Overlay District. If the projects are
7 Ordinance No. 38.861
eligible for streamlining under State law, they would still be subject to the City’s Objective Design Standards.
SECTION 3. AMENDMENT OF MILPITAS MUNICIPAL CODE TITLE XIII, CHAPTER B.20
Title XIII, Chapter B.20 of the Milpitas Municipal Code is hereby amended to add Section B.20.040 Transit-Oriented Development Overlay Zone and reads as follows:
A. Purpose. The Transit-Oriented Development (TOD) Overlay Zone implements California Government Code Sections 65912.155 et seq., herein referred to as Senate Bill 79 (SB 79).
B. Applicability. The TOD Overlay Zone is applicable to any zoning district on lands that are within one-half mile from a transit-oriented development stop, as defined by Section 21064.3 of the California Public Resources Code. This Section is only applicable so long as SB 79 is operative and effective and shall thereafter be of no force or effect, including if transit-oriented housing development projects are no longer required by applicable state law to be an allowed use on sites zoned for residential, mixed, or commercial use within the TOD Overlay Zone.
C. Definitions. The following definitions included in California Government Code Section 65912.156 are incorporated herein by reference and shall be applied to this Section only:
1. Housing Development Project;
2. Residential Floor Area Ratio;
3. Tier 1 Transit-Oriented Development Stop;
4. Tier 2 Transit-Oriented Development Stop;
5. Transit-Oriented Development Stop; and
6. Transit-Oriented Development Zone.
Additional definitions provided in California Government Code Section 65912.156 are not directly incorporated in this Section but may be referenced as applicable to this Section only.
The following additional definitions, which do not appear in California Government Code Section 65912.156, also apply to this Section only:
“Transit-oriented housing development project” shall mean housing development projects allowed pursuant to California Government Code Section 65912.157.
D. Permitted, Accessory, and Conditionally Permitted Uses. Notwithstanding anything to the contrary in this Section, the permitted, accessory, and conditional uses allowed within the TOD Overlay Zone are the same uses as allowed within the underlying base zones, except as otherwise required by SB 79.
E. Tier 1 and Tier 2 Transit-Oriented Development Stops
1. The following Tier 1 TOD stops are located within the City of Milpitas:
8 Ordinance No. 38.861
a. Milpitas BART Station
2. The following Tier 2 TOD stops are located within the City of Milpitas:
a. Great Mall VTA Light Rail Station
b. Alder Light VTA Rail Station
F. Development Standards. The development standards for the underlying base zoning district shall apply, except as modified below:
1. A housing development project shall be an allowed use as a transit-oriented housing development project on any site zoned for residential, mixed, or commercial development within one-half or one-quarter mile of a transit-oriented development stop, if the development complies with the following requirements in addition to all otherwise applicable laws:
a. Includes at least five dwelling units.
b. The average total area of floor space for the proposed units in the transit- oriented housing development project does not exceed 1,750 net habitable square feet.
c. For a transit-oriented housing development project within one-quarter mile of a Tier 1 transit-oriented development stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 75 feet
(ii) Min Density: 60 du/acre; Max density: 120 du/acre
(iii) Residential floor area ratio max: 3.5
(iv) Follow all other development standards as specified for the R5- Metro zoning district.
d. For a transit-oriented housing development project further than one- quarter mile but within one-half mile of a Tier 1 transit-oriented stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 65 feet
(ii) Min Density: 60 du/acre; Max density: 100 du/acre
(iii) Residential floor area ratio max: 3
(iv) Follow all other development standards as specified for the R5- Metro zoning district.
e. For a transit-oriented housing development project within one-quarter mile of a Tier 2 transit-oriented development stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
9 Ordinance No. 38.861
(i) Max height: 65 feet
(ii) Min Density: 60 du/acre; Max density 100 du/acre
(iii) Residential floor area ratio max: 3
(iv) Follow all other development standards as specified for the R5- Metro zoning district.
f. For a transit-oriented housing development project further than one- quarter mile but within one-half mile of a Tier 2 transit-oriented development stop, all of the following apply, unless otherwise permitted under the applicable Specific Plan:
(i) Max height: 55 feet
(ii) Min Density: 50 du/acre; Max density 80 du/acre
(iii) Residential floor area max: 2.5
(iv) Follow all other development standards as specified under the R4- Metro zoning districts.
g. Areas zoned R1-6: For a qualifying transit-oriented housing development project within the R1 zoning district, the following apply:
(i) Include at least five dwelling units; and
(ii) Max height: See Tier 1 or 2 standards
(iii) Min density: 30 du/acre; Max: See Tier 1 or 2 standards. (iv) Follow all other development standards as specified under the R4 zoning district.
h. Adjacency Bonus: A transit-oriented housing development project that is immediately adjacent to a transit-oriented development stop (200 feet proximity) shall be eligible for an adjacency intensifier to:
(i) Increase the height limit by an additional 20 feet; and (ii) Increase the maximum density by an additional 40 du/acre (iii) Increase the residential floor area ratio by 1
2. For the purposes of this Section, the distance of a transit-oriented housing development project from a transit-oriented development stop shall be measured in a straight line from the nearest edge of the parcel containing the proposed project to a pedestrian access point for the transit-oriented development stop.
3. Transit-oriented housing development projects shall not be located on either of the following:
a. A site containing more than two units where the development would require the demolition of housing that is subject to any form of rent or
10 Ordinance No. 38.861
price control that has been occupied by tenants within the past seven years.
b. A site that was previously used for more than two units of housing that were demolished within seven years before the development proponent submits an application under this Section and any of the units were subject to any form of rent or price control.
4. Transit-oriented housing development projects proposed pursuant to this Section shall meet the labor standards of subparagraphs (A), (B), (C), (D), (F) and (G) of paragraph (8) of subdivision (a) of California Government Code Section 65913.4 for any building over 85 feet in height.
G. Additional Requirements. Transit-oriented housing development projects allowed pursuant to this Section remain subject to local requirements otherwise applicable to housing development projects, including but not limited to:
1. Development plans must be approved pursuant to all applicable design review procedures under Chapter C.2 (General Development Standards), including the Milpitas Residential and Mixed-Use Objective Design Standards.
2. Developments proposing to remove protected trees shall comply with Milpitas Municipal Code Section X-2-7.01 (Existing Trees Protected).
3. All applicable projects must comply with the affordable housing requirements in Milpitas Municipal Code Chapter XII-1 (Affordable Housing Ordinance).
4. Developments proposing to utilize State Density Bonus Law shall comply with the procedures in Chapter C.12 (Density Bonus for Affordable Housing Developments).
a. Developments under this Section shall be eligible for a density bonus, incentives or concessions, waivers or reductions of development standards, and parking ratios pursuant to California Government Code Section 65915, using the density allowed under this Section as the base density. If the development proposes a height under this Section in excess of the height limit, then the City shall not be required to grant the waiver, incentive, or concession pursuant to California Government Code Section 65915 for additional height beyond specified in this Section.
b. A development shall be eligible for the following additional concessions, if it meets the applicable density thresholds specified:
(i) For a development providing housing for extremely low income households, three additional concessions.
(ii) For a development providing housing for very low income households, two additional concessions.
(iii) For a development providing housing for low-income households, one additional concession.
11 Ordinance No. 38.861
(iv) To qualify for these additional concessions, the development must meet the following applicable density thresholds:
a. For a transit-oriented housing development project within one-quarter mile of a Tier 1 transit-oriented development stop achieve a minimum density of 90 du/acre.
b. For a transit-oriented housing development project further than one-quarter mile but within one-half mile of a Tier 1 transit-oriented stop, achieve a minimum density of 75
du/acre.
c. For a transit-oriented housing development project within one-quarter mile of a Tier 2 transit-oriented development stop, achieve a minimum density of 75 du/acre.
d. For a transit-oriented housing development project further than one-quarter mile but within one-half mile of a Tier 2 transit-oriented development stop, achieve a minimum
density of 60 du/acre.
5. Developments shall comply with all applicable development impact fees.
6. Developments proposing subdivision of land shall comply with Milpitas Subdivision Ordinance (Title XI, Chapter 1).
7. Developments shall comply with California Government Code Section 66300.6, including any local requirements or processes implementing the provisions of Section 66300.6.
8. Developments shall comply with any applicable local demolition and anti- displacement standards established through a local ordinance pursuant to California Government Code Section 65912.157(f) and Title XII (Housing).
9. All standards otherwise applicable under this Title, the General Plan, and any applicable Specific Plan, Planned Use Development, or Development Agreement.
H. Affordability Provisions. A housing development proposed pursuant to this Section shall include on-site housing for lower income households by complying with one of the following requirements:
1. Any of the following:
a. At least 7 percent of the total units are dedicated to extremely low income households, as defined in Section 50106 of the California Health and Safety Code.
b. At least 10 percent of the total units are dedicated to very low income households, as defined in Section 50105 of the California Health and Safety Code.
12 Ordinance No. 38.861
c. At least 13 percent of the total units are dedicated to lower income households, as defined in Section 50079.5 of the California Health and Safety Code.
2. This Subsection shall not apply to any development of 10 units or less.
3. All units dedicated to extremely low income, very low income, and low-income households pursuant to the above section shall meet both of the following:
a. The units shall have an affordable housing cost, as defined in Government Code Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Government Code Section 50053 of the Health and Safety Code.
b. The development proponent shall agree to the continued affordability of all affordable rental units included pursuant to this section for 55 years and all affordable ownership units included pursuant to this section for a period of 45 years.
4. If the City of Milpitas’s inclusionary housing requirement in Milpitas Municipal Code Chapter XII-1 (Affordable Housing Ordinance) mandates a higher percentage of affordable units or a deeper affordability than that described above, then the City’s inclusionary housing requirement mandate shall apply in addition to the requirements above.
I. Streamlining Incentives.
1. A housing development project proposed pursuant to this Section shall be eligible for streamlined ministerial approval pursuant to California Government Code Section 65913.4 in accordance with all of the following:
a. The proposed project shall be exempt from subparagraph (A) of paragraph (4) of, and paragraph (5) of, subdivision (a) of California Government Code Section 65913.4.
b. The proposed project shall comply with the affordability requirements in subclauses (I) to (III), inclusive of clause (i) of subparagraph (B) of paragraph (4) of subdivision (a) of California Government Code Section 65913.4.
c. The proposed project shall comply with all other requirements of Government Code Section 65913.4, including, but not limited to, the prohibition against a site that is within a very high fire hazard severity zone, pursuant to subparagraph (D) of paragraph (6) of subdivision (a) of California Government Code Section 65913.4.
2. Any housing development proposed pursuant to this Section not seeking streamlined approval under California Government Code Section 65913.4 shall be reviewed according to the City of Milpitas’s development review process and California Government Code Section 65589.5, except that any zoning standard that conflicts with the requirements of this Section shall not apply.
13 Ordinance No. 38.861
SECTION 4. AMENDMENT OF THE ZONING MAP OF THE CITY OF
MILPITAS
The Zoning Map of the City of Milpitas, as amended, which was adopted as part of Ordinance No. 38.858, enacted as Title XIII, Chapter A, Section 2.060 of the Milpitas Municipal Code (“Zoning Map”), is hereby amended by rezoning the land use designation of only those parcels depicted within the depicted map as attached hereto as Exhibit A.
SECTION 5. CALIFORNIA ENVIRONMENTAL QUALITY ACT
The City Council finds, pursuant to Government Code Section 65912.160(c)(2), the provisions of this Ordinance do not constitute a project and therefore are statutorily exempt from the California Environmental Quality Act.
SECTION 6. SEVERABILITY
The provisions of this Ordinance are separable, and the invalidity of any phrase, clause, provision, or part has no effect on the validity of the remainder.
SECTION 7. EFFECTIVE DATE AND POSTING
In accordance with Section 36937 of the Government Code of the State of California, this Ordinance takes effect 30 days from the date of its passage. The City Council hereby directs the City Clerk to cause this Ordinance or a summary thereof to be published in accordance with Section 36933 of the Government Code of the State of California.
14 Ordinance No. 38.861
Exhibit A: Zoning Map Amendment
M
C
C
A
R
T
H
Y
B
L
V
D
L
A
N
D
E
S
S
A
V
E
DOWNING RD
M
O N T A G U E
E X P
Y
L A H O N D A
D
R
N
M
I
L
P
I
T
A
S
B
L
V
D
PIEDMONT RD
J A C K L I N R D
CIELO LINDO CMN
P I M
E N T E L
C
I
R
S
U
N
N
Y
H
I
L
L
S
D
R
S
P
A
R
K
V
I
C
T
O
R
I
A
D
R
W
C
A
L
A
V
E
R
A
S
B
L
V
D
C
A
S
C
A
D I T A T
E
R
E
S
C
U
E
L
A
P
K
W
Y
E CALAVERAS BLVD
MARYLINN DR
U
R
I D
I A
S R
A
N
C
H
R
D
N
P A R K
V
I C
T
O
R
I
A
D
R
L
O
N
D
O
N
D R
M
U
R
P
H
Y
R
A
N
C
H
R
D
B E L S H
A
W
D
R
A
L
E
G
R
A
T
E
R
C
A L A V E R A S
R D
M
E
T
R
O P O
L
I T
A
N
D
R
S
H
A
U
G
H
N
E
S
S
Y
D
R
T
A
S
M
A
N
D
R
C
O
Y
O
T
E C
R
E
E
K
W
A
Y
G
R
E
A
T
M
A
L
L
P
K
W
Y
DIXON LANDING RD
KENNEDY DR
BOTHELO AVE
AYER ST
FIRE WALK
D
U
T
T
O
N
W
O
O
D
L
N
S MILPITAS BLVD
S ABEL ST
N
E
S
T
W
O
O
D
W
A
Y
RUSSELL LN
N ABEL ST
C
A
L
I
F
O
R
N
I
A
C
I
R
C A L L E
M
E
S
A
A
L
T
A
DIXON RD
LOS COCHES ST
O R N E L L A S
D
R
D
E
M
P
S
E
Y
R
D
REFLECTIONS WAY
W
A
S
H
I
N
G
T
O
N
S
Q
U
A
R
E
D
R
WYLIE DR
TOWNE DR
AUGUSTINE PARK
ODYSSEY LN
WASHINGTON DR
JURGENS DR
P
O
P
P
Y
L
N
C
U
R
R
L
I
N
CIR
E
V
A
N
S
R
D
STRICKROTH PARK
PINEWOOD PARK
BEN RODGERS PARK
HALL MEMORIAL PARK
S
T
A
R
L
I
T
E
D
R
HEATH ST
GINGERWOOD DR
ABEL PLAZA
S
T R
A W
B E R
R
Y
L N
C
E L E
B
R
A
T
I
O
N
D
R
GREENWOOD WAY
MANFERD ST
STARLITE PARK
LINDEN LN
S A N A N D R E A S D R
O
A
K
H
U
R
S
T
W
A
Y
W
O O D L A N D
W A Y
CURTIS AVE
HAMMOND WAY
JASMINE CT
ALTON ST
F
A
L
C
A
T
O
D
R
BERYLWOOD LN
CORNING AVE
AUTREY ST
E D E L N
W
E
S
S
E
X
P
L
W
C
A
P
I T
O
L
A V E
OLD EVANS RD
D
U
B
O
I S
S
T
BARBER LN
D
A
V
I D
L N
BERESFORD SQ
S
N
E
L
L
P
L
REDWOOD AVE
DIEL DR
B
A
D
G
E
R
W
O
O
D
L
N
TOWN CENTER DR
T
I M
B
E
R
W
A
Y
CUCIZ LN
CARDOZA PARK
CENTRAL PLAZA
S
I L
V
E
R
L
A
K
E
D R
T R A M W A Y D R
C
U E S T
A
D
R
M
E
A
D
O
W
H
A
V
E
N
W
A
Y
YOSEMITE DR
B A J A R O S E S T
C A M
E R
O
N
C
I
R
C
L O V E R
C
I R
IMAGES CIR
EDSEL DR
BETTENCOURT WAY
T U L A R C I T
O
S
D
R
SANDALWOOD PARK
JUNIPERO DR
P
A
R
K
H
I
L
L
D
R
D
I
A
M
O
N
D
W
A
Y
A
S
P
E
N
R
I D
G
E
D
R
R O
C K Y
M
O
U N T A I N
A V E
F
A
I
R
M
E
A
D
O
W
W A Y
N MAIN ST
Q
U A I L
D R
GORDON ST
SPENCE AVE
N
T
E
M
P
L
E
D
R
A U
G
U
S
T
A
C
T
ROSWELL DR
G
E
R
A
L
D
C
I R
N
H
I
L
L
V
I
E
W
D
R
M
A R
T I L
W
A
Y
MERRY LOOP
CRESTHAVEN ST
GLENVIEW DR
M
O
N
T
E
D
R
COMET DR
O
R
O V I L L E
R
D
EAGLE RIDGE WAY
C
O
E
L H
O
S
T
O N T A R
I O
R
D
L
E
E
W
A
Y
S U T T E R W
I N D
D
R
C O S T I G A N
C
I
R
FIESTA PLAZA
RAILROAD AVE
P I N A R D
S T
N
I
G
H
T
S
H
A
D
E
R
D
FASCINATION PL
S TEMPLE DR
BALBOA DR
M
I
L
K
W
E
E
D
S
T
S
A
G
E
B R U S H
S T
PESCADERO ST
P
A
L
I
S
A
D
E
S
D
R
ELM AVE
PENITENCIA ST
C L E A R
L A K E
A V E
S K Y L I N E
D
R
E
T
H
Y
L
S
T
EASTER AVE
MILMONT DR
ANGUS DR
PIPER DR
FIRETHORN ST
S
E
A
S
I
D
E
W
A
Y
D
U
N
D
E
E
A
V
E
S
T
A
R
L
I T
E
C T
DEMPSEY WAY
S
A
N
A
N
D
R
E
A
S
C
T
ABERDEEN CT
FONTAINBLEU AVE
S
A
S
S
O
N
E
C
T
H
O
U
R
E
T
C
T
L O S
P I N O S
A V E
PESCADERO CT
C
A
L
L
E
V
I
S
T
A
V
E
R
D
E
SAGE CT
C
A
L
A
V
E
R
A
S
R
I
D
G
E
D
R
S U D B U R
Y
D
R
CRACOLICE WAY
Y E L L O
W
S T O N E
A
V
E
R
I
O
V
E
R
D
E
P
L
MCCANDLESS DR
TOWN CENTER
RAND ST
N
O
V
A
C
T
VIENNA DR
G
A
L
I N
D
O
C
T
CAMPBELL ST
SANDALRIDGE CT
T
E
R
N
U
R
A
L
O
O
P
S
U
P
E
R
I
O
R
R
D
L
A
C
R
O
S
S
E
D
R
CORTEZ ST
JACKLIN CT
S
U
M
M
E
R
F
I
E
L
D
D R
SANTA RITA DR
GENEVA RD
C
O
L
U
M
B
U
S
D
R
PALMER ST
J U P I T E
R
D
R
MAZEY ST
S I N G L E
Y D
R
SERRA WAY
BIG BASIN DR
ASHLAND DR
V
E
N
U
S
W
A
Y
W
E L L E R L
N
ARIZONA AVE
S N A P D R A G O N S
T
R
I
D
G
E
M
O
N
T
D
R
BEE CT
MILPITAS SQ
C A R L S B A D
C
T
R
O
G
E
R
S
T
M
E S A
V E R D E
D R
L
A
R
C
H
S
T
SEQUOIA DR
CONWAY ST
F
A
L
L
E
N
L
E
A
F
D
R
N
A
B
B
O
T
T
A
V
E
E
L
C
A
M
I
N
O
H
I
G
U
E
R
A
S
A
N
D
A
L
W
O
O
D
L
N
S
A
B
B
O
T
T
A
V
E
T
E
R
R
A
A
L
T A
D
R
GUERRERO CT
V
A
S
O
N
A
S
T
KEVENAIRE DR
BURLEY DR
M
O
U
L
T
O
N
D
R
LAURYN RIDGE CT
FIELDCREST DR
RUDYARD DR
KENISTON AVE
ACADIA AVE
BLUE SPRUCE WAY
BIXBY DR
L
A
V
E
N
D
E R
L
O
O
P
CREED ST
C
A
L
L
E
D
E
L
S
O
L
HERMINA ST
TICE DR
C A N T O N
D R
F I R T
R
E
E
C
T
S
I
M
A
S
D
R
H
A
Y
C
T
H
A
M
I
L
T
O
N
A
V
E
S
A
N
D
H
U
R
S
T
D
R
T H I S T L E
P
L
A L M A D E N A V E
SUNFLOWER LN
I N C L I N E C
T
CALLE ORIENTE
COSTA ST
BOULDER ST
CHESTNUT AVE
W
H
I
T
C
O
M
B
C
T
S A G E M
E
A
D
O
W
C
T
B
E
L
B
R
O
O
K
W
A
Y
N O R W I C H
A V E
N GADSDEN DR
PRINTY AVE
C E D A R
W A Y
SYLVIA AVE
HOLLY WAY
HORCAJO ST
PARKTOWN PLAZA
PATRICIA CT
M T
S H A S T A
A V E
M
I D
W
I C K D R
STEMEL WAY
P A C H E C O D R
PRADA DR
BARKER ST
M
A
D
A
L
E
N
D
R
U
V
A
S
S
T
TORRES AVE
PASHOTE CT
S GADSDEN DR
PLATT AVE
EAST LN
C H E W
P O
N
A V E
CARNEGIE DR
ROSE DR
S MAIN ST
B
O
L
T
O
N
D
R
ADAMS AVE
H
O
U R E T
D R
TOPAZ ST
T
O
P
H
A
M
C
T
LYNN AVE
DENNIS AVE
NEWBURY ST
D
I
S
C
O
V
E
R
Y
L
N
E
T
H
Y
L
C T
W
O
O
D
W
A
R
D
D
R
GARDEN ST
A
L
V
A
R
E
Z
C T
S
T
R
I
C
K
R
O
T
H
D
R
PINEWOOD WAY
S
T
R
A
T
F
O
R
D
D
R
MCCARTHY RANCH
ALBANY CT
H
A
S
T
I N
G
S
D
R
WILSON WAY
N
I
E
V
E
S
C
T
B R I A N
C
T
O
R
E
G
O
N
W A Y
GLADDING CT
P
O
L
A
R
I S
C
T
A L T A M O
N
T D R
MUSTANG DR
KIRKWALL PL
C H Y S I S R
D
C
H
I
P
M
A
N
D
R
FERREIRA CT
ABERDEEN WAY
S
O
L
A
R
C
T
C
A
R
L
S
B
A
D
S
T
VARGAS CT
ENRIQUEZ CT
BERRYESSA ST
DOLORES DR
DELANO ST
VINEYARD AVE
D O N A H E D R
CHAD DR
K
L
A
M
A
T
H
R
D
C H E R R Y
C
I
R
BUCKEYE CT
CURTNER DR
CADENCE LN
C
O
U
N
T
R
Y
C
L U
B
D
R
N I E V E S
S T
BUTLER ST
CARINO TER
TRAUGHBER ST
BRYCE CT
ARANA CT
CALYPSO LN
PARK WILLOW CT
S U N N Y
H
I L
L
S
C
T
BELLEW DR
PARK BROOK CT
F R A N K
C
T
S E P U L V E D A
A
V
E
NICKLAUS AVE
H
E
M
L
O
C
K
L N
R
I
E
S
L
I
N
G
A
V
E
JOURNEY ST
SUMMERWIND WAY
B
L
U
E
S
P
R
U
C
E
C
T
V
A L L
E
Y
W
A
Y
M A N
Z
A
N
I T
A
C
T
M
A
T
T
E
R
H
O
R
N
C
T
W
E
S
T
R
I
D
G
E
D
R
SILVERA ST
MICHAEL CT
J
U
N
G
F
R
A
U
C
T
SMITHWOOD ST
B
I
G
B
E
A
R
C
T
JUPITER CT
F
O
R
E
S
T
C
T
B
E
R
E
S
F
O
R
D
C
T
M
E
R
Z
C T
W
O
O
D
L
A
N
D
C
T
F O N T A I N B L E U C
T
A R B O
R
W
A
Y
CANTERBURY PL
GROSS ST
LONETREE CT
PERRY ST
J
O
S
H
U
A
T
R
E
E
C
I
R
SHENANDOAH AVE
S
T
E
M
E
L
C
T
SINNOTT LN
SILVERLAKE CT
S A T U
R
N
C
T
T
A
R
O
B
C
T
P A S E O
R E F U G
I O
WOODCOCK CT
F
L
U
M
E
C T
H
O
R
C
A
J
O
C
I
R
J
A
C
K
L
I N
C
I R
GOSSER ST
BERRENDO DR
P
I
N
E
W
O
O
D
C
T
S
A
R
K
C
T
WHITTIER ST
R
A
I
L
R
O
A
D
C
T
TRENTO LN
B A Y B E R R Y
W
A
Y
ALVAREZ CMN
G L E N M O O R
C
I
R
P
A
C
I F I
C
A
W
A
Y
WINSOR ST
TINY ST
AVIAN LN
C
A
M
A
R
I
L
L
O
C
T
S I L V
E
R
T
I P
C
T
WILD ROSE WAY
CARDIFF PL
S
I
N
C
L
A
I
R
F
R
O
N
T
A
G
E
R
D
TECHNOLOGY DR
RANKIN DR
J
A
S
O
N
D
R
ED LEVIN PARK
A N A C A P A
C
T
CENTRE POINTE DR
T
E
R
R
A
C
O
T
T
A
C
T
B
L
E
E
C
K
E
R
S
T
F O U N
D
E
R
S
L
N
CELERITY PL
CLYDE CT
E
C
A
P
I T
O
L
A
V
E
ANN PL
A
A
R
O
N
P
A
R
K
D
R
CASCADE ST
C
O
U
R
T
L
A
N
D
C
T
COFFEE BERRY LN
K
O
V
A
N
D
A
W
A
Y
GLASGOW CT
MONTAGUE CT
D
E
V
O
N
P
L
H
I L
L
V
I E
W
C T
LEVIN ST
D e L O N G L
N
P
R
I N
C
E
S
S
P
L
FALCON DR
P R
A D
A
C
T
PARC PLACE DR
T R O
O
N
C
T
CYPRESS DR
MIHALAKIS ST
BRIDGEWATER LN
G R E E N T R E E W A Y
SPRING VALLEY LN
E X P E D I T I O N
L N
S
T
I R
L
I N
G
D
R
S A N G O
C
T
WOODRUFF WAY
DANIEL CT
LARKSPUR LN
SPRIG CENTER
MANZANO ST
B
E
R
K
S
H I R E
P L
W
E
L
L
I
N
G
T
O
N
D
R
S
E
A
S
I D E D R
WILLOW LN
HEARST DR
C
A
P E L
L
A
W
A
Y
C
R
E
S
C
E
N
T
T
E
R
A L E X
A
N
D
E
R
W
A
Y
E M E R G E N C Y A C C E S S R D
S
A
N
T
O
S
C
T
CALAVERAS CT
K
R
I
S
T
I
N
R
I
D
G
E
W
A
Y
F A I R
H I L L
D R
A
L
D
E
R
D
R
GREENROCK RD
BOND ST
E
V
E
N
I N
G
S
T
A
R
C
T
S
E
R
P
A
D
R
H
I
L
L
T
O
P
C
T
S H
E T L A N D
C T
K
N
O
L
L
V
I
E
W
D
R
SHELLEY CT
L
O
C
H
L
O
M
O
N
D
C
T
C
A
D
I
L
L
A
C
C
T
BARBER CT
PEDRO AVE
O L D
C A L A V E R A S
R D
PARK VIEW DR
BEAUMERE WAY
OLIVER ST
G
I
B
R
A
L
T
A
R
C
T
ELLIS AVE
GLACIER DR
M
A
R
K E T S T
PARK GROVE DR
PARK HEIGHTS DR
C
O
U
R
T
L
A
N
D
A
V
E
BORDER WAY
S
H
I L
L V
I E
W
D
R
H
A
Z
E
L
N
U
T
L
N
CASPER ST
CORINTHIA DR
P
E
C
T
E
N
C
T
C
O
V
E
N
T
R
Y
W
A
Y
VIEW DR
FARMCREST ST
CARL AVE
ELLWELL DR
FINDLEY DR
GIRARD DR
DALTON DR
MOMENTUM DR
CLAUSER DR
TAYLOR DR
VEGAS AVE
VALMY ST
HEFLIN ST
W
A
T
S
O
N
C
T
STULMAN DR
L
A
B
A
R
E
E
D
R
BRALY AVE
LASSEN AVE
M
A
I N
P
L
S
T
A
N
D
R
E W
S
C
T
GOLDEN HILLS DR
LAWTON DR
MURRAY ST
T E R R A
B E L L
A
D
R
L Y
N
W
O
O
D
T
E
R
BEACON DR
GOMES LN
KRISMER ST
BURDETT WAY
C
I
R
O
L
E
R
O
S
T
L A G U N A
D
R
M
I
N
N
I
S
C
I
R
GATES DR
E D G E W
A T
E
R
D
R
FREELAND DR
WILLOW AVE
GEMMA DR
THOMPSON ST
PEPPER PL
ARMAND DR
S H I R L E Y
D
R
CARDOZA LN
HANSON CT
TURQUOISE ST
RIVERA ST
CESTARIC DR
FANYON ST
V
I
S
T
A
R
I
D
G
E
D
R
C
H
U
R
C
H
I
L
L
D
R
BUCKEYE DR
MAPLE AVE
C
A
L
E
R
A
C
R
E
E
K
H
E
I
G
H
T
S
D
R
KIZER ST
UNNAMED ST
B L U E R I D G
E
D
R
WALNUT DR
V
I
D
A
L A
R
G
A
L
O
O
P
COTTONWOOD DR
OLYMPIC DR
CANAL ST
M
A
T
T O
S
D
R
E
V
E
R G R E E N
W A Y
BUSKIRK ST
T A S S A S A R A
D R
CALLAN ST
AYER LN
HAZEN ST
BOYD ST
Q U
I N
C
E
L
N
M
O
O
N
B
E
A
M
W
A
Y
C
L
A
R
I
D
A
D
L
O
O
P
M
O
N
M
O
U
T
H
D
R
BIG BEND DR
R
A
N
C
H
D
R
PETERSBURG DR
BLISS AVE
M
E
N
T
E
L
I N
D
A
L
O
O
P
Y
O
S
E
M
I
T
E
W
A Y
C A N A D A
D R
B
A
Y
V
I E
W
P
A
R
K
D
R
M
O
R
E
T
T
I
L
N
MOONLIGHT WAY
SARATOGA DR
B A R C E L O
N
A
LOOP
S
U
M M E R W I N D D R
WRIGLEY WAY
STARDUST WAY
L O S P O S I T O S
D R
GRAND TETON DR
C
R
E
E
K
S
I
D
E
W
A
Y
SUNRISE WAY
EVERGLADES DR
C
O
Y
O
T
E
S
T
G
R
A
Y
S
O
N
WAY
M
T
R A I N I E R
A V E
C R A T E R
L A K E
A V E
AMES AVE
PORTOLA DR
TERRA VISTA CT
SONOMA DR
HIDDEN CREEK LN
M T
D I A B L O
A V E
RODRIGUES AVE
STELLAR WAY
F A I R V I E W
W
A
Y
D E S E R T H O L L Y S
T
T
R
E
N
T
O
L
O O P
FERNLEAF DR
G
I
B
R
A
L
T
A
R
D
R
A L C O S T A
D R
ELDERBERRY DR
S E L W
Y N
D
R
CALERO ST
SEACLIFF DR
L A S L O M A S
D R
SHILOH AVE
PARVIN DR
V A L E N C I A D R
E
L K
W
O
O
D
D
R
SYCAMORE DR
TAHOE DR
BUTANO DR
THOMPSON CT
M
E A D O W
L A N D
D
R
WOOL DR
G
R
E
A
T
H
O
U
S
E
D
R
C
A
L
A
D
E
N
I
A
L
N
P E B B L E B E A C
H
C
T
VISTA WAY
L
E
X
I
N
G
T
O
N
S
T
SANDISK DR
CENTRIA LN
M E R I D
I A
N
P
L
A
L
V
I S
O
-
M
I
L
P
I
T
A
S
R
D
AMALFI LOOP
LACEY DR
N
M
C
C
A
R
T
H
Y
B
L
V
D
MACHADO AVE
C O
B B L E S
T
O
N
E
L O
O
P
PUD 11
PUD 71
PUD 55
PUD 20
PUD 37
PUD 20-A
PUD 45
PUD 48
PUD
39 PUD 10
PUD 64
PUD 50
PUD 60
PUD 18-A
PUD 47
PUD 18-A
PUD 8-A
PUD 26
PUD 44
PUD 43
PUD 19
PUD 74
PUD 6
PUD 77
PUD 23.5
PUD 69
PUD 36
PUD 33
PUD 9
PUD 42
PUD 58
PUD 12 PUD 25
PUD 68
PUD 32
PUD 21
PUD 8-A
PUD 18
PUD 54
PUD 14
PUD 34
PUD 17
PUD 22
PUD 62
PUD 5E-1
PUD 5-B
PUD 40
PUD 5
PUD 5
PUD 27
PUD 51
PUD 35
PUD 5-B
PUD 23
PUD 75
PUD 47
PUD 76
PUD 57
PUD 31
PUD 72
PUD 78
PUD 82
PUD 80
PUD
79 PUD
PD18-0001
VP 2
VP 3
VP 4
VP 5
VP 6
VP 7
VP 8
Zones
Single-Family minimum lot size 2,500 s.f. (R1-2.5)
Single-Family minimum lot size 3,000 s.f. (R1-3)
Single-Family minimum lot size 4,000 s.f. (R1-4)
Single-Family minimum lot size 5,000 s.f. (R1-5)
Single-Family minimum lot size 6,000 s.f. (R1-6)
Single-Family minimum lot size 10,000 s.f. (R1-10)
Single-Family with Hillside Combining District (R1-H)*
One or Two-Family (R2)
Multi-Family (R3)
Multi-Family Very High Density (R4)
Mobile Home Park (MHP)
Mixed Use (MXD)
Very High Density Mixed Use (MXD3)
Town Center (TC)
Town Center (TC1)
Town Center (TC2)
Town Center (TC3)
Neighborhood Commercial Mixed Use (NCMU1)
Neighborhood Commercial Mixed Use (NCMU2)
Neighborhood Commercial Mixed Use (NCMU3)
Administrative and Professional Office (CO)
Neighborhood Commercial (C1)
General Commercial (C2)
Highway Services (HS)
Light Industrial (M1)
Heavy Industrial (M2)
Industrial Park (MP)
Business Park Research & Development (BPRD)
Institutional (I)
Agricultural (A)
Park and Open Space (POS)
Waterway
Milpitas Metro Specific Plan Zones
Metro Multi-Family High Density Residential (R3-Metro)
Metro Multi-Family Very High Density Residential (R4-Metro) Metro Urban Residential (R5-Metro)
Metro High Density Mixed Use (MXD2-Metro)
Metro Very High Density Mixed Use (MXD3-Metro)
Metro Business Park Research & Development, Limited Residential (BPRD-R-Metro) Metro Business Park Research & Development (BPRD-Metro) See Milpitas Gateway-Main St. Specific Plan for zones
Overlay
Freeway Corridor Overlay (FC)
TOD Overlay
Tier 1 - Half Mile
Tier 1 - Quarter Mile
Tier 1 - 200ft
Tier 2 - Half Mile
Tier 2 - Quarter Mile
Tier 2 - 200ft
Other Features
Planned Unit Development (PUD)
Precise Plan Area of the Midtown Specific Plan
Midtown Specific Plan Area
Metro Specific Plan Area
City Boundary
Parcels
Crestline
View Points
0 0.5 1
Miles
/
May 2026
ZONING MAP WITH TOD OVERLAY
CITY OF MILPITAS
§¨¦
880
§¨¦
880
§¨¦
680
§¨¦
680
*Note: The "H" Hillside Combining District is mapped as R1-H. The Site and Architectural (S) Overlay was adopted through a voter initiative and is not currently mapped on any parcel.