Cities Index.
Agenda packet

Economic Development Committee
January 22, 2025

Document
Agenda packet
Meeting
January 22, 2025
Body
Economic Development Committee
Pages
16
Original file
22.7 MB
Text extracted from the city's file for reading and search. Open the original on agenda2.modestogov.com. That file is the official record.

- 1 -
1/22/2025 4:00:00 PM
www.modestogov.com
AGENDA
City of Modesto

ECONOMIC DEVELOPMENT COMMITTEE

COUNCIL WORKSHOP
2001-40 Del Puerto Room.

Tenth Street Place, 1010 10th Street
Modesto, California
Wednesday, January 22, 2025 at 4:00 PM
Roll Call: Eric Alvarez, Chair
Sue Zwahlen, Vice-Chair
Nick Bavaro, Member
Alternates: Rosa Escutia-Braaton, Chris Ricci, Jeremiah Williams, David Wright Council has not delegated directive or final approval authority to the Committees.

Committee actions are recommendations to the full City Council, not final decisions on an issue. * Public Comment will only be in-person. Members of the public who wish to address the Committee, by providing public comment, during the meeting must do so in-person in the 2001-40 Del Puerto Room. As an alternative, members of the public may also provide written public comment submitted via email as indicated in the Submitting Comments by Email instructions on this agenda. Zoom will still be available for viewing and Wordly translation. *Members of the public will be allowed to provide public comment through Zoom if a Committee Member is participating remotely pursuant to the provisions of Assembly Bill 2449. *Effective March 1, 2023, if a technical issue arises with Zoom or the phone dial-in option, the Committee meeting will continue unless the meeting is being held pursuant to the provisions of Assembly Bill 2449. Alternative viewing options are listed below, and the meeting is physically open to the public.
“Wordly” can translate into 25+ different languages! To access written translation during the meeting, please scan the QR Code or click this link https://attend.wordly.ai/join/RJDY-6364.
- 1 -
1/22/2025
- 2 -
1/22/2025 4:00:00 PM
"Wordly" puede traducir a más de 25 idiomas diferentes! Para acceder a la traducción durante la reunión, por favor escanee el código QR o haga clic en el enlace https://attend.wordly.ai/join/RJDY-6364.

THE MEETING CAN BE VIEWED BY ZOOM VIDEO

CONFERENCING OR TELEPHONE
Joining the Committee meeting via Zoom
The City of Modesto is now offering the ability to view Committee meetings via telephonic conferencing via “Zoom” video conferencing computer technology. The meeting may be accessed through the use of Zoom using the following options:
 Enter the following link into an Internet Browser
https://us02web.zoom.us/j/95895497651
 Enter the following link into an Internet Browser https://zoom.us/ and using the Webinar ID: 958 9549 7651
 Passcode: 84326
To use Zoom, please visit: https://zoom.us/ and either sign-up for a free Zoom account or continue as a guest. Once you have downloaded the app onto your mobile device, joined from your web browser, or downloaded the Zoom software on your computer you will be ready for the upcoming Committee meeting.

Joining the Committee meeting via Telephone
If you don’t have a smart phone or computer to access the meeting via Zoom, you can listen by phone, by calling 1-877-853-5257 (Toll Free) or 1-888-475-4499 (Toll Free) and enter the Webinar ID 958 9549 7651 Passcode 84326

PUBLIC COMMENTS IN PERSON
Three-minute time limit per speaker.

Only interested persons in the audience may present these matters.

Under State law, Committee Members may respond to matters being presented under this item only as follows:
a. Briefly respond to statements made or questions raised. b. Ask a question for clarification.
c. Provide a reference to staff or other resources for factual information. d. Request staff to report back at a subsequent meeting. e. Finally, a Committee Member or the Committee itself may take action to direct staff to place a matter of business on a future agenda.

SUBMITTING COMMENTS BY E-MAIL
Written comments may be submitted via email to: [email protected] (include Agenda Item Number in the subject line). All comments will be shared with the Committee - 2 -
1/22/2025
- 3 -
1/22/2025 4:00:00 PM
Members and placed in the record but will not be read aloud during the meeting. Written comments must be received two hours before the meeting.

This Agenda is on file in the City Clerk’s Office, Sixth Floor, 10th Street Place, Posting Board at entry of 10th Street Place, and is available on the City’s Web site at www.modestogov.com.

Materials related to an item on this Agenda submitted to the Council after distribution of the agenda packet are available for public inspection in the Clerk’s office during normal business hours. Such documents are also available online, subject to staff’s ability to post the documents before the meeting, at the following website www.modestogov.com/councilmeetings In accordance with the requirements of Title II of the Americans with Disabilities Act (“ADA”) of 1990, the Fair Employment & Housing Act (“FEHA”), the Rehabilitation Act of 1973 (as amended), Government Code section 11135 and other applicable codes, the City of Modesto (“City”) will not discriminate against individuals on the basis of disability in the City’s services, programs, or activities. For more information, please visit the City of Modesto website at https://www.modestogov.com/865/Americans-with-Disabilities-Act-ADA In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk (209) 577-5396. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting
Any and all of the following agenda items are subject to action by the Modesto City Council.

CONSENT ITEMS – ROLL CALL VOTE REQUIRED:

Information concerning the consent items listed below has been forwarded to each Committee Member prior to this meeting for study. Unless some member of the audience or Committee Member has a question concerning an item and asks that it be withdrawn from the consent list, the Committee approves the items at one time. The action taken by the Committee in approving consent items is set forth in the explanation of this individual item.

CONSENT
An item may be removed from consent and discussed at the request of an audience member or committee member.

Consent

1. Consider an Agreement with Carollo Engineers, Inc., Sacramento CA for Standard Operating Procedures Development Services for a total amount not to exceed $801,220 and forwarding to Council for approval. (Funding Source: Sewer Operations Funds)  Motion recommending an Agreement with Carollo Engineers, Inc., Sacramento, CA for Standard Operating Procedures Development in the amount of $728,382, plus $72,838, if needed, for an Agreement total amount not to exceed $801,220; and forwarding to Council for approval. - 3 -
1/22/2025
- 4 -
1/22/2025 4:00:00 PM
 Motion recommending an increase to Non-Capital Project Number 101474 of $401,220, from $400,000, for a revised total amount not to exceed $801,220, and forwarding to Council for approval.

UTILITIES; Jeff Daniels, 209-577-6255, [email protected]

NEW BUSINESS

2. Consider the Plans and Specifications for the Scenic Drive Phase II, Dry Creek Trail Phase II, Kansas Avenue, & Neighborhood Traffic Calming Program Cycle I Project, accepting the Bid and Awarding a Contract to Bay Cities Paving & Grading, Inc., of Concord, CA, for a total amount not to exceed $13,551,894; and approving an Agreement with TRC Engineers, Inc., of Lathrop, CA for Construction Management Services, Inspection and Materials Testing Services for a total amount not to exceed $957,577 and forwarding to Council for approval. (Funding Source: Local Measure L Funds)
 Motion recommending the Plans and Specifications for the Scenic Drive Phase II, Dry Creek Trail Phase II, Kansas Avenue, & Neighborhood Traffic Calming Program Cycle I Project, accepting the Bid and Awarding a contract to Bay Cities Paving & Grading, Inc., of Concord, CA, in the amount of $12,319,904, and authorizing Change Orders up to the cumulative amount of $1,231,990, for a total Agreement amount not to exceed $13,551,894; and recommending an Agreement with TRC Engineers, Inc., of Lathrop, CA for Construction Management and Inspection Services for the Scenic Drive Phase II, Dry Creek Trail Phase II, Kansas Avenue, & Neighborhood Traffic Calming Program Cycle I Project in an amount not to exceed $870,525, plus $87,052 for additional services, if needed, for a total amount not to exceed $957,577 and forwarding to Council for approval.

ENGINEERING SERVICES; Michael Sacuskie, 209-571-5552,
[email protected]

3. Consider a report on the upcoming Coffee Road Strengthen & Replace Water Mains Construction Project and forwarding to Council for approval. (Funding Source: Water Fund)
 Motion accepting a report on the upcoming Coffee Road Strengthen & Replace Water Mains Construction Project and forwarding to Council for approval.

UTILITIES; Edgar Vargas, 209-577-5424, [email protected]

ADJOURNMENT
Posted pursuant to Government Code Section 54954.2 on the bulletin board at Tenth Street Place on at by
date time signature
- 4 -
1/22/2025

CITY OF MODESTO

COMMITTEE AGENDA REPORT
DATE OF MEETING:

January 22, 2025
Date: January 2, 2025
TO: Economic Development Committee
Eric Alvarez, Chair
Sue Zwahlen, Vice-Chair
Nick Bavaro, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: William Wong, Director of Utilities
SUBJECT: Agreement for Standard Operating Procedures Development CONTACT: Jeff Daniels, Wastewater Division Manager, [email protected], 209-577- 6255
DESCRIPTION:

Consider an Agreement with Carollo Engineers, Inc., Sacramento CA for Standard Operating Procedures Development Services for a total amount not to exceed $801,220 and forwarding to Council for approval. (Funding Source: Sewer Operations Funds) STRATEGIC PLAN ELEMENT:

The recommended action supports the 2020-2025 City of Modesto Strategic Plan Initiatives, Goal D: Provide safe, efficient, and reliable infrastructure through proactive community investment, maintenance, and sustainability efforts.

BACKGROUND:

The City of Modesto owns and operates the City’s Regional Water Recycling Facility (WRF). Over the past 18 years, the City has expanded and updated its wastewater treatment processes to meet both State and Federal water quality mandates. The WRF is permitted by the California Regional Water Quality Control Board, Central Valley Region to discharge treated effluent to the San Joaquin River and to the Delta-Mendota Canal. The WRF is divided into two campuses: the Sutter Campus and the Jennings Campus. The City of Modesto Regional WRF has an antiquated set of Standard Operating Procedures (SOPs) that do not completely reflect current operations.

In a recent Gap Analysis, 212 suggested SOPs were identified as needing to be completed, 70 of which have been deemed high priority (“Priority 1”), with the remainder designated at a lower priority (“Priority 2”).

The original gap analysis was just one component of a larger evaluation that focused on several issues related to Plant Operations, which did not include Plant Maintenance. The Plant #1..
- 5 -
Economic Development Committee, January 22, 2025
Agreement for Standard Operating Procedures Development

Page 2 of 3 ends

Maintenance team has a small list of nine (9) current SOPs, and they would now like a gap analysis performed for Maintenance as part of this project for Operations.

DISCUSSION:

This project will result in a comprehensive suite of SOPs for both the City of Modesto’s Sutter and Jennings Regional Water Recycling facilities and the seven-mile pipeline connecting the two. The current and still being developed Area Management Plans (AMP) initially outline approximately two-hundred twenty (220) SOPs establishing a solid foundation of SOPs for both facilities and the connecting pipeline. Currently, the Wastewater Division operates from approximately fifty (50) dated SOPs that may not reflect current operations. The envisioned SOPs outlined in the AMP – called the 2023 SOPs - are prioritized based on critical business needs, safety and/or permit compliance. Due to the potential obsolescence of the existing SOPs, it is anticipated that at least seventy (70) Priority 1 SOPs are needed soon. A gap analysis of the Plant Maintenance procedures will also be needed, including a Technical Memo describing recommended procedures and prioritization.

The final product will result in a comprehensive digital library of interrelated Priority 1 and Priority 2 SOPs that are digitally attached to various databases in use, including the Electronic Operations and Maintenance Manual, the Maintenance Connection Computerized Maintenance Management System, the existing Lock Out/Tag Out procedures, and a future asset management system. The digital product will provide hyperlinks within each SOP directing users to other relevant information or procedures.

On May 24, 2024, the Purchasing Manager authorized staff to solicit proposals from the City of Modesto’s prequalified Consultant List that was approved on April 12, 2022, by Resolution No. 2022-191.

On September 23, 2024, a Request for Proposals with a specific scope of work was issued to Woodard and Curran, West Yost, Carollo Engineers, and BKF engineering consulting firms.

On November 19, 2024, staff received and distributed one (1) proposal to a selection committee consisting of members from the City of Modesto Wastewater Division.

On November 26, 2024, the selection committee evaluated the proposal submitted by Carollo Engineers and determined it was responsive.

In accordance with Modesto Municipal Code 8-3.204(a), “Exceptions to Formal Bidding Requirements,” Agreements for Professional Servies are exempt from the bidding requirements of Modesto Municipal Code 8-3.203 if competitive quotations or proposals have been sought informally from at least three (3) qualified entities. Staff complied with the informal bid procedures and solicited proposals from the City of Modesto’s prequalified Consultant List approved by Resolution 2022-191. An award of an Agreement for Standard Operating Procedures Development for the Utilities Department, Wastewater Division to use Carollo Engineers, Inc., Sacramento, CA, conforms to the Modesto Municipal Code. Staff recommends the approval of an Agreement for Standard Operating Procedures Development with Carollo Engineers, Inc. #1..
- 6 -
Economic Development Committee, January 22, 2025
Agreement for Standard Operating Procedures Development

Page 3 of 3 ends

FISCAL IMPACT:

Funds are currently budgeted in the Sewer Operations Fund, FY 2023/24 Non-Capital Project Number 101474, SOP Development at $400,000. An additional $401,220 from Sewer Operations Fund Reserves will be needed to fund the project.

The total estimated cost for identified engineering scope of services for the agreement is $728,382. Staff is also requesting ten percent (10%) of the agreed maximum compensation, or $72,838, for additional services that may be authorized by the City Manager.

ANTICIPATED PROJECT EXPENDITURES:

CEQA/NEPA REQUIREMENTS:

The approval of this agreement does not constitute a project for the purposes of the California Environmental Quality Act (CEQA).

RECOMMENDED COMMITTEE ACTION:

Staff Recommendation:

Motion recommending an Agreement with Carollo Engineers, Inc., Sacramento, CA for Standard Operating Procedures Development in the amount of $728,382, plus $72,838, if needed, for an Agreement total amount not to exceed $801,220; and forwarding to Council for approval.

Motion recommending an increase to Non-Capital Project Number 101474, SOP Development of $401,220, from $400,000, for a revised total amount not to exceed $801,220, and forwarding to Council for approval.

Approved by:

William Wong, Director of Utilities
Joseph P. Lopez, City Manager
Attachments:

1. Agreement

2. Exhibit A Carollo Proposal

3. Exhibit B Cost Proposal

4. RFP 2323-99 Standard Operating Procedures Development Engineering Services Agreement – Carollo Engineering $728,382 Additional Services, if Needed (10%) $72,838
TOTAL: $801,220
#1..
- 7 -

STANDARD AGREEMENT

FOR CONSULTANT SERVICES
THIS AGREEMENT for consultant services (“Agreement”), is made and entered into in the City of Modesto, State of California, this day of , 2025, (“Effective Date”) by and between the CITY OF MODESTO, a municipal corporation of the State of California, hereinafter referred to as "City", and CAROLLO ENGINEERS, a California corporation, hereinafter referred to as "Consultant".

This Agreement is made with regard to the following recitals:

A. The City has determined that Consultant Services are necessary for Standard Operating Procedures Development.

B. Consultant represents that it is qualified, willing, and able to provide the services to prepare said documents.

NOW, THEREFORE, in consideration of this agreement, and the mutual promises, covenants, and stipulations hereinafter contained, the parties agree as follows:

1. SCOPE OF SERVICES.

Consultant shall undertake and complete the preparation of the scope of work as set forth and described in the documents attached hereto and referred to as Exhibit "A" or "project". The Consultant shall perform the services as described in Exhibit "A" in a manner compatible with the standards of its profession and shall produce a fully complete project that is acceptable to City.

2. TERM OF AGREEMENT.

This Agreement is effective as of the Effective Date and will continue in effect until City's acceptance of and payment for all services authorized by City and performed by Consultant unless terminated earlier in accordance with the provisions of the #1..
- 8 -
termination clause in this Agreement.

Consultant shall undertake and complete the preparation of the scope of work as set forth and described in the documents commonly referred to as “project” attached hereto as Exhibit "A" and made a part hereof. City hereby gives Consultant notice to proceed with the preparation of the project in the manner described in Exhibit "A", as of the Effective Date of this Agreement. Consultant shall diligently proceed with the preparation of the project and agrees to complete said preparation within the time period set forth in Exhibit "A".

3. COMPENSATION.

Consultant agrees to accept a sum not to exceed SEVEN HUNDRED TWENTY-EIGHT THOUSAND THREE HUNDRED EIGHTY-TWO AND 00/100 DOLLARS ($728,382) (maximum compensation) as full remuneration for performing all services and furnishing all staffing and materials called for City in accordance with Exhibit "A”, attached hereto and for performance by Consultant of all of its duties and obligations under this Agreement, except that additional services may be compensated as described below.

The Compensation shall be paid pursuant in the manner and at the times set forth below:

City shall pay Consultant on a time and materials basis for Consultant’s actual costs for all work called for in Exhibit “A” to this Agreement. All work to be performed under this Agreement shall be billed at the hourly rates set forth in Exhibit “B” attached hereto.

Consultant shall submit monthly invoices to City which include detailed tasks, hours worked, and billable rates for all work completed, and detailed receipts for any out-of-pocket costs paid by Consultant in connection with work performed on this project.

Additional services may be authorized by the City Manager in an amount up to, but not to exceed 10% of the agreed maximum compensation, or SEVENTY-TWO #1..
- 9 -
THOUSAND EIGHT HUNDRED THIRTY-EIGHT AND 00/100 DOLLARS ($72,838). In the event that additional services are deemed necessary, the Consultant shall provide a written request to the City Manager indicating the reason for additional work, scope and cost of such work.

The City Manager shall provide a written response to the request, either approving or denying the additional expenditure. If additional services are requested and approved, they will be billed at the hourly rates set forth in Exhibit “B” and may not exceed the amount requested and approved in writing by the City Manager. In that event, the new total compensation shall not exceed EIGHT HUNDRED ONE THOUSAND TWO HUNDRED TWENTY AND 00/100 DOLLARS ($801,220). If additional services in excess of this amount are deemed necessary by City Staff, an amendment to this Agreement will be required and must be approved by the City Council prior to commencing the work, as provided in Section 9 of this agreement.

4. OBLIGATIONS OF CONSULTANT.

Throughout the term of this Agreement, Consultant shall possess, or secure all licenses, permits, qualifications and approvals legally required to conduct business. Consultant warrants that it has all of the necessary professional capabilities and experience, as well as all tools, instrumentalities, facilities and other resources necessary to provide the City with the services contemplated by this Agreement. Consultant further warrants that it will follow the best current, generally accepted, and professional practices to make findings, render opinions, prepare factual presentations, and provide professional advice and recommendations regarding this project.

5. PERFORMANCE BY KEY EMPLOYEE.

Consultant has represented to City that Chris Vasquez will be the person primarily responsible for the performance of the services referred to in this Agreement. City has entered into this Agreement in reliance on that representation by Consultant. Consultant therefore #1..
- 10 -
agrees that forty percent (40%) or more of the time to be devoted to the project that is the subject of this Agreement will be that of the above-named person.

6. OWNERSHIP OF DOCUMENTS/TITLE TO DATA.

Ownership of Documents
All reports, drawings, designs, graphics, working papers and other incidental work or materials furnished hereunder shall become and remain the property of the City, and may be used, reused, or disposed of by City as it may require without any additional cost to City. No reports shall be used by the Consultant for purposes other than this contract without the express prior written consent of City.

Title to Data
If, as a part of the Agreement, Consultant is required to produce data such as, but not limited to, drawings, plans, specifications, calculations, models, flow diagrams, visual aids and other related materials, the originals of all such data generated under this agreement will be delivered to City upon the completion or termination of services under the contract.

All materials, documents, data or information obtained from the City data files or any City medium furnished to Consultant in the performance of this Agreement will at all times remain the property of the City. Such data or information may not be used or copied for direct or indirect use by Consultant after termination of this Agreement without written consent of the City.

7. NEWS AND INFORMATION RELEASE.

Consultant agrees that it will not issue any news releases in connection with either the award of this Agreement, or any subsequent amendment of or efforts under this Agreement, without first obtaining review and approval of said news releases from the City through the City Manager.
#1..
- 11 -

8. INTEREST OF CONTRACTOR.

Consultant warrants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Agreement. Consultant warrants that, in performance of this Agreement, Consultant shall not employ any person having any such interest. Consultant agrees to file a Statement of Economic Interests with the City Clerk at the start and end of this contract if so required at the option of City.

9. AMENDMENTS.

Both parties to this Agreement understand that it may become desirable or necessary during the execution of this Agreement, for City or Consultant to modify the scope of services provided for under this Agreement. This Agreement, including the Exhibits attached hereto, may be amended only by an Amendment signed by both Parties. City will not be responsible to pay any charges Consultant may incur in performing services not identified in Exhibit ‘A’ unless first authorized by the City in writing, and Consultant shall not be required to perform any such additional services.

10. INDEPENDENT CONTRACTOR.

All acts of Consultant, its agents, officers, and employees and all others acting on behalf of Consultant relating to the performance of this Agreement, shall be performed as independent contractors and not as agents, officers, or employees of City. Consultant, by virtue of this Agreement, has no authority to bind or incur any obligation on behalf of City. Consultant has no authority or responsibility to exercise any rights or power vested in the City. It is understood by both Consultant and City that this Agreement shall not under any circumstances be construed or considered to create an employer-employee relationship or a joint venture. #1..
- 12 -
Consultant, its agents, officers and employees are and, at all times during the terms of this Agreement, shall represent and conduct themselves as independent contractors and not as employees of City.

Consultant shall determine and control the method, details and means of performing the work and services to be provided by Consultant under this Agreement. Consultant shall be responsible to City only for the requirements and results specified in this Agreement, and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of the Consultant in fulfillment of this Agreement. Consultant is permitted to provide services to others during the same period service is provided to City under this Agreement. If necessary, Consultant has the responsibility for employing other persons or firms to assist Consultant in fulfilling the terms and obligations under this Agreement.

If in the performance of this Agreement any third persons are employed by Consultant, such persons shall be entirely and exclusively under the direction, supervision, and control of Consultant. All terms of employment including hours, wages, working conditions, discipline, hiring, and discharging or any other term of employment or requirement of law shall be determined by the Consultant.

It is understood and agreed that as an independent contractor and not an employee of City neither the Consultant or Consultant's assigned personnel shall have any entitlement as a City employee, right to act on behalf of the City in any capacity whatsoever as an agent, or to bind the City to any obligation whatsoever.

It is further understood and agreed that Consultant must issue W-2 forms or other forms as required by law for income and employment tax purposes for all of Consultant's personnel.
#1..
- 13 -
As an independent contractor, Consultant hereby indemnifies and holds City harmless from any and all claims that may be made against City based upon any contention by any third party that an employer-employee relationship exists by reason of this Agreement.

11. ASSIGNMENT.

Neither this Agreement nor any portion thereof shall be subcontracted or assigned, other than noted in Exhibit ‘A’, without the express prior written consent of the City in each and every instance.

12. PATENT/COPYRIGHT MATERIALS.

Unless otherwise expressly provided in the contract, Consultant shall be solely responsible for obtaining the right to use any patented or copyrighted materials in the performance of this Agreement. Consultant shall furnish a warranty of such right to use to City at the request of City.

13. NOTICES.

Notice required by this Agreement shall be given in writing and shall be deemed given and effective upon delivery provided that such are delivered in accordance with the provisions of this Section. Notices shall be delivered either by: (a) personal delivery; (b) overnight courier service which obtains confirmation of delivery; or (c) certified pail, return receipt requested, if delivery is confirmed by a return receipt; or (d) by electronic transmission subject to reasonable proof that the notice was both transmitted and received. Each such notice shall be sent to the parties at the address respectively set forth below or to such other address as a party may designate by written notice given in accordance with the provisions of this Section:

FOR CONSULTANT: Name: Carollo Engineers
Address: 2880 Gateway Oaks Drive
Suite 300
Sacramento, CA 95833 ______
Attention: Chris Vasquez
#1..
- 14 -
Phone: (559) 696-7115
Email: [email protected]
FOR CITY: Name: City of Modesto
Address: 1221 Sutter Avenue
Modesto, CA 95351
Attention: Ben Koehler
Phone: (209) 342-4502
Email: [email protected]

14. INSURANCE REQUIREMENTS.

The Consultant shall provide at its own expense and maintain at all times the following insurance with insurance companies licensed in the State of California and shall provide evidence of such insurance to the City as may be required by the Risk Manager of the City. The policies or certificates thereof shall provide that, thirty (30) days prior to cancellation or material change in the policy, notices of same shall be given to the Risk Manager of the City by certified mail, return receipt requested, for all of the following stated insurance policies.

In the event the certificates of insurance required hereunder do not provide for notice of cancellation to the certificate holder and/or additional insureds, the Consultant shall provide, and shall require its subcontractors to provide, as an express condition precedent to payment hereunder, an endorsement from their insurers providing that the additional insureds identified herein shall be provided 30 days’ notice of the cancellation on the policies of insurance required hereunder (10 days’ notice if the policies are cancelled for non-payment of premium). In addition, the named insured on all such policies shall provide to the additional insureds identified herein any notices of cancellation of said insurance policies within 5 business days of receipt of such notice. The Consultant shall, as a further express condition precedent to payment for work performed, affirm under penalty of perjury that the required insurance on the project remains in place and said insurance has not been cancelled.
#1..
- 15 -
(a) Worker's Compensation - in compliance with the statutes of the State of California, plus employer's liability with a minimum limit of liability of $1,000,000. (b) General Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. This insurance shall indicate on the certificate of insurance the following coverages and indicate the policy aggregate limit applying to: premises and operations; broad form contractual; independent consultants and subcontractors; products and completed operations as applicable.
(c) Automobile Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. This insurance shall cover any automobile for bodily injury and property damage.
(d) Professional Liability insurance with a minimum limit of $1,000,000 per claim and policy aggregate. If coverage is on a claims made basis it shall be maintained for at least three (3) years following completion of the work.

If at any time any of said policies shall be unsatisfactory to the City, as to form or substance, or if a company issuing such policy shall be unsatisfactory to the City, the Consultant shall promptly obtain a new policy, submit the same to the Risk Manager for approval and submit a certificate thereof as hereinabove provided. Upon failure of the Consultant to furnish, deliver or maintain such insurance and certificates as above provided, this Agreement, at the election of the City, may be forthwith declared suspended or terminated. Failure of the Consultant to obtain and/or maintain any required insurance shall not relieve the Consultant from any liability under this Agreement, nor shall the insurance requirements be construed to conflict with or #1..
- 16 -
otherwise limit the obligations of the Consultant concerning indemnification. The City, its agents, officers, employees, and volunteers shall be named as an additional insured on all insurance policies required herein, except Workers' Compensation and Professional Liability. The Workers' Compensation insurer shall agree to waive all rights of subrogation against the City, its agents, officers, employees, and volunteers for losses arising from work performed by Consultant for the City. The Consultant's insurance policy(ies) shall include a provision that the coverage is primary as respects the City; shall include no special limitations to coverage provided to additional insured; and, shall be placed with insurer(s) with acceptable Best's rating of A: VII or with approval of the Risk Manager. The Consultant must deliver certificates evidencing existence of the insurance listed above to the City prior to the time the contract is signed.

CONSULTANT shall provide CITY with separate endorsements evidencing proof of the CITY’s additional insured status as to both the general liability and automobile liability insurance policies. In addition, CONSULTANT shall provide CITY with a Workers Compensation subrogation waiver by way of a separate endorsement. All endorsements referenced above must include the applicable policy number.

For any claims related to this project, the CONSULTANT’S insurance coverage shall be primary insurance as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or volunteers shall be excess of the CONSULTANT’S insurance and shall not contribute with it.

15. TERMINATION OF AGREEMENT.

Termination for Default of Consultant
Should Consultant default in the performance of this Agreement or materially breach any of its provisions, at its option, City may terminate this Agreement by #1..
- 17 -
giving written notification to Consultant. The termination date shall be the effective date of the notice. For the purposes of this section, material breach of this Agreement shall include, but not be limited to, any of the following: failure to perform required services or duties, willful destruction of City's property by Consultant, dishonesty or theft.

Termination by City for Convenience
The City may cancel this Agreement at any time, with or without cause, upon written notification to Consultant.

Post-Termination Procedure
Upon receipt of a written notice of termination, the Consultant shall:
a. Cease its work as directed in the notice of termination as of the termination date and see to it that its employees, subconsultants and agents are notified of such termination and act as specified in the notice of termination;
b. Terminate all orders and Subcontractors except as necessary to complete any portion of the Work that is not terminated; c. If directed in writing by the City to do so, assign all right, title and interest in subcontracts and materials in progress to City, in which case the City will have the right at its discretion to settle, or pay any or all claims arising out of the termination of such subconsultants, but in no event shall recovery by any Consultant or subconsultant include lost profits for portions of the Work not completed or undertaken, including materials not delivered; d. Deliver or otherwise make available to the City all data, drawings, specifications, reports, estimates, summaries and such #1..
- 18 -
other information and material as may have been accumulated by the Consultant in performing the Work whether completed or in process; e. Settle outstanding liabilities and claims, subject to the approval of City;
f. Complete performance of such part of the Project as has not been terminated;
g. Take such other actions as may be necessary, or as may be directed by the City for the protection and preservation of the Project and/or property related to the Project;
h. If City so requests, and at City's cost, Consultant shall provide sufficient oral or written status reports to make City reasonably aware of the status of Consultant's work on the project. i. The Consultant understands and agrees that City may, in City's sole discretion, refuse to pay Consultant for that portion of Consultant's services which were performed by Consultant on the project prior to the termination date and which remain
unacceptable and/or not useful to City as of the termination date.

City will pay Consultant for work actually completed prior to the receipt of the termination notice or otherwise completed in accordance with the notice of termination.

The final payment to the Consultant after termination for convenience shall be limited to amounts due and owing under the Agreement at time of termination, including the following:
a. The cost of settling and paying valid claims arising out of the termination of the Work such as subconsultant agreements or contracts for materials;
#1..
- 19 -
b. The Agreement price allocable to the portion of the Work properly performed or goods supplied to the work site by the Consultant as of the date of termination, as determined in accordance with the notice of termination, reduced by any sums previously paid to the Consultant.

16. INDEMNITY.

The Consultant shall hold the City, its agents, officers, employees, and volunteers, harmless from and save, defend and indemnify them against any and all claims, losses, liabilities, judgments or damages from every cause, including but not limited to injury to person or property or wrongful death, including reasonable costs and expenses of defense of any judicial or administrative action, arising directly or indirectly out of any negligent or intentional act or omission of Consultant, or its agents, officers, employees, or volunteers relating to or during the performance of its obligations under this Agreement.

Consultant's obligation to defend, indemnify, and hold the City, its agents, officers, and employees harmless under the provisions of this paragraph is not limited to or restricted by any requirement in this Agreement for Consultant to procure and maintain a policy of insurance.

In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. #1..
- 20 -

17. DISPUTE RESOLUTION.

Venue for all claims, controversies, or disputes arising out of, or relating to the formation of this Agreement, or the breach, termination execution, enforcement, interpretation, or validity of this Agreement, including the determination of the scope or applicability of this contract provision shall be in the Superior Court of Stanislaus County or the United States District Court for the Eastern District of California.

18. ATTORNEYS’ FEES.

If a party to this AGREEMENT brings any action, including an action for declaratory relief, to enforce or interpret the provision of this AGREEMENT, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

19. ENTIRE AGREEMENT.

This Agreement and its exhibits contain the entire understanding between Consultant and City. All previous proposals, offers and communications relative to this Agreement, whether oral or written, are hereby superseded except to the extent that they have been incorporated into this Agreement.

20. PARTIAL INVALIDITY.

If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force without being impaired or invalidated in any way.

21. WAIVER.
#1..
- 21 -
The waiver by any party to this Agreement of a breach of any provision hereof shall be in writing and shall not operate or be construed as a waiver of any other or subsequent breach hereof unless specifically stated in writing.

22. AUDIT.

The City's duly authorized representative shall have access at all reasonable times to all reports, contract records, contract documents, contract files, and personnel necessary to audit and verify Consultant's charges to City under this Agreement.

Consultant agrees to retain reports, records, documents, and files related to charges under this Agreement for a period of four (4) years following the date of final payment for Consultant services. City's representative shall have the right to reproduce any of the aforesaid documents.

23. GOVERNING LAW.

This Agreement shall be governed according to the laws of the State of California.

24. HEADINGS NOT CONTROLLING.

Headings used in the Agreement are for reference purposes only and shall not be considered in construing this Agreement.

25. COMPLIANCE WITH LAWS.

Consultant shall insure compliance with all safety and hourly requirements for employees, in accordance with federal, state, and county safety and health regulations and laws.

Consultant shall fully comply with all applicable federal, state, and local laws, ordinances, regulations and permits.

26. CITY BUSINESS LICENSE.

Consultant shall have a City of Modesto business license. #1..
- 22 -
IN WITNESS WHEREOF, the City of Modesto, a municipal corporation, has authorized the execution of this Agreement by its City Manager and attestation by its City Clerk under authority of Resolution No. 2025- , adopted by the Council of the City of Modesto on the day of , 2025, and CAROLLO ENGINEERS has caused this agreement to be duly executed in duplicate as of the Effective Date. #1..
- 23 -
NOVEMBER 2024
PROPOSAL (RFP) 2324-99
Standard Operating
Procedures Development

CITY OF MODESTO
Prepared for #1..
- 24 -
2880 Gateway Oaks Drive
Suite 300
Sacramento, California 95833
916.565.4888
carollo.com
November 15, 2024
City of Modesto, City Clerk’s Office
1010 Tenth Street, 6th Floor
Modesto, California 95354
Attention: Ben Koehler, Chief Plant Operator
Subject: Proposal – RFP 2324-99 Standard Operating Procedures Development Dear Mr. Koehler:

Carollo has been assisting the City over the last 20 years on utility projects and appreciates the opportunity to assist operations and maintenance (O&M) staff with their SOP development. Carollo has worked closely with the City to complete the operational guidance program (Blue Plan-it®) as well as the initial phase of this project in developing the Area Management Plans (AMP) and outlining the gaps and the initial list of needed SOPs.

Carollo is approaching this project from two sides: the first is using our historical knowledge of the City's facilities through engineering and operations support. The second is bringing in team members who have operated similar wastewater facilities and have created and relied upon SOPs. They understand the importance of the SOPs not just from a permit requirement, but as a useful tool for O&M staff. By approaching this from two sides, the goal is to reduce the amount of City effort required to complete this project.

We have put together a team that is familiar with the City of Modesto, including Ryan Sellman, our principal-in-charge, who has worked on the City’s largest wastewater projects since 2012 and has intimate knowledge of the City’s treatment facilities. Steve Walker, our QA/QC/SOP development lead, has worked together with O&M staff since assisting with startup and training of the Jennings Campus Phase 2 Treatment Plant. Steve has provided guidance to management and has been instrumental in getting the City to this point in developing SOPs. Stephen Snell, our digital integration lead, has worked with the City for over eight years on developing and updating the City’s electronic O&M manual, and is currently working on moving it to a new SharePoint server.

This team, along with our project manager, Chris Vasquez, who is a Grade V wastewater treatment operator, has worked with several plants to update and create SOPs. Chris will work closely with City staff to develop your SOPs.

We feel we are uniquely qualified with our team. Carollo has been heavily involved with the design and construction of the City’s treatment facilities. This team has been involved with startup and training on these new facilities, as well as providing guidance and assistance wherever needed. This will allow us to hit the ground running and require reduced City staff time to get started on SOPs.

We look forward to the opportunity to work with you and our team is ready to get started on these important SOPs. As always, Carollo is committed to assisting the City in a timely manner if selected for this project. If you have any questions, please reach out to Chris at 559-696-7115 or [email protected], or Ryan at 209-518-6855 or [email protected].

Sincerely,
CAROLLO ENGINEERS, INC.

Chris Vasquez Ryan Sellman, PE
Project Manager Principal-in-Charge
#1..
- 25 -
Table of Contents

PROJECT TEAM AND EXPERIENCE

PROPOSED SCOPE OF SERVICES

PROJECT SCHEDULE

LEVEL OF EFFORT

APPENDIX
Resumes
Contract Comments
#1..
- 26 -
Project Team and
Experience
#1..
- 27 -
1 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Project Team and Experience
Carollo’s singular focus, infrastructure
expertise, and familiarity with your staff
and facilities make us the right partner
to help you develop standard operating
procedures (SOPs) for your Sutter and
Jennings wastewater facilities and the
seven-mile pipelines connecting the two.

Organized to Meet Your Needs
Project manager Chris Vasquez brings
experience with California wastewater
regulations and compliance requirements,
and he has worked with this team on
several projects. He understands the
importance of building consensus for key
decisions and getting the details right.

Chris and principal-in-charge Ryan
Sellman have built a team that combines
leadership on prior Modesto projects, a
strong track record with operations, and
a deep understanding of your treatment
challenges to deliver the optimum project
for your available budget.

WATER IS ALL WE DO. The City will benefit
from Carollo's water-only focus.

Ryan Sellman, PE

PRINCIPAL-IN-CHARGE
Ryan will oversee resource
allocation, quality of project work
and deliverables, and be an advisor to
the City/team as needed. He will use his successful
history with several recent Modesto projects to help
deliver results that address your project goals. Ryan
has worked closely with the City of Modesto for more
than 12 years and brings 17 years of overall experience, 84MOD1124po01
Project Manager/SOP Developer
Chris Vasquez
QA/QC / SOP Development Lead
Steve Walker
Justin O’Brien
SOP Developer/Support
Digital Integration Lead
Steve Snell
Principal-in-Charge
Ryan Sellman
Expert Technical Guidance
including planning and design of both wastewater
and water infrastructure, wastewater process
design, civil design, hydraulics, and construction
management/inspection. He has provided an array
of wastewater engineering services for the City
of Modesto, including working on the following
projects: WWTP Operations Guidance Program;
SCADA System Upgrade Design-Build Owner’s
Advisor; the Headworks, Dryden Box, and Influent
Flume Upgrades at Sutter; Jennings Phase 2; and
North Valley Regional Recycled Water Program OA.
15%
Availability
#1..
- 28 -

PROJECT TEAM AND EXPERIENCE
2 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Chris Vasquez

PROJECT MANAGER
Chris has 19 years of project management and operations experience in the wastewater industry. He has experience in navigating local, state, and federal regulations, working on capital improvement projects, process control, and optimizing wastewater treatment plant operations and maintenance. He also has advanced skills in asset and data management, budgeting tools and software, Operator 10, Hach Wims, Microsoft Office and SQL, Antero, Maintenance Connection, MP2 Link.

Work History Carollo Engineers: 2 years
Other firms: 17 years
Education MS Public Administration,
University of Phoenix, 2018
BS Environmental Science,
University of Phoenix, 2016
Certification Wastewater Grade 5 Operator, California
Advanced Water Treatment Pant Operator
Grade 3, CWEA/AWWA
Role: Project Manager
Completion Date: 2027 (est.)
Commitment: 10%
Firm: Carollo
Cost: $6.7 million
Client Contact: Mary Gomez, Senior
Sustainability Principal Engineer
7701 Legacy Drive
Plano, TX 75024
972-334-2061
Role: Project Manager
Completion Date: 2022
Firm: Jacobs
Cost: $8.4 million
Client Contact: Saeid Vaziry,
Environmental Programs Manager
7351 Rosanna Street
Gilroy, CA 95020
408-848-0480
Confidential Snack Packaging Client
San Bernardino County, CA
Project manager. The primary objective of
the reuse project is to achieve major savings
in water usage by treating the process
wastewater to potable quality and reusing
the clean water unrestricted within the
manufacturing facility.

Chris' work includes:
ƒ Maintaining client relations.
ƒ Operation and maintenance of an advanced water reuse facility. ƒ Developing and implementing standard operating procedures. ƒ Managing contract/budget, and preparing invoices.

Contract Operations for
South County Regional
Wastewater Treatment and
Reclamation Facility
South County Regional Wastewater
Authority, Gilroy, CA
Project manager. The 8-mgd Bardenpho facility produced Title 22 recycled water through the use of anthracite gravity filters and UV and chlorine disinfection. Chris' work included:
ƒ Managing the operation and maintenance of the
wastewater treatment facility.
ƒ Developing and submitted all reports for local, State, and Federal agencies.
ƒ Managing permits (NPDES, WDR), and managing contract/budget.

Relevant Experience
30%
Availability
#1..
- 29 -

PROJECT TEAM AND EXPERIENCE
3 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Chris Vasquez – Relevant Experience
Consulting Services
American Valley Community Services
District WWTP, Quincy, CA
Chief Plant Operator. Carollo was retained
to provide temporary Chief Plant Operator
(CPO) services at the District's WWTP to
serve and act as CPO and oversee the
WWTP's operations until the District finds a full-time on-site solution.

Chris work includes:
ƒ Providing oversight on daily operations.
ƒ Providing QA/QC on state reports.
ƒ Training staff on process control, proper sampling, and trouble shooting. ƒ Providing training for staff taking CA WWTP certification exams.

Phase 1 Expansion
Laguna County Sanitation District, CA
Operations Consultant. This project
provided startup assistance and process
control training for the District's Phase 1
Expansion. Chris' work included:
ƒ Conducting seeding and startup of the new activated sludge facility. ƒ Conducting training on new processes and activated sludge. ƒ Helping mitigate concerns with a pump station shutdown.

Richmond WWTP Critical
Improvements Project
Veolia North America, Richmond, CA
Operations Specialist. The project involved
the conversion of mechanical aerators to
fine bubble diffusers, the addition of an
anoxic selector, and a new RAS pumping
system. Chris' work included:
ƒ Troubleshooting process/compliance issues.
ƒ Developing aeration basin and anoxic selector seeding and startup plan.
ƒ Developing a process control sheet with KPIs.
ƒ Providing operations process support.

Role: Operations Consultant
Completion Date: 2024
Firm: Carollo
Cost: $56 million
Client Contact: Jerry Nichols,
Chief Plant Operator
3500 Black Road
Santa Maria, CA 93455
805-934-6281
Role: Chief Plant Operator
Completion Date: 2025 (est)
Commitment: 10%
Firm: Carollo
Cost: $140,000
Client Contact: Katie Nunn,
General Manager
900 Spanish Creek Road
Quincy, CA 95971
530-283-0836
Role: Operations Specialist
Completion Date: 2024
Firm: Carollo
Cost: $40 million
Client Contact: Rodrigo Belisario
Vignau Loria, Project Manager
601 Canal Blvd.

Richmond, CA 94804
510-367-2228
#1..
- 30 -

PROJECT TEAM AND EXPERIENCE
4 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Steve Snell

DIGITAL INTEGRATION LEAD
Steve is Carollo’s Operations and Maintenance (O&M) delivery lead and has 38 years of experience developing, consulting, and managing data analysis, information systems, and training solutions for public utilities and the Department of Defense sectors. His expertise includes information system design and integration for applications of knowledge management, asset and maintenance management, condition assessment, and operation data analysis for O&M costs, process improvements, and staffing. Having managed more than 60 facility O&M information system projects, he knows how to execute extensive data collection from multiple system and client institutional knowledge resources.

Work History Carollo Engineers: 9 years
Other firms: 29 years
Education AS Information Technology, Valencia College, 2015 AS Computer Information Systems, Valencia College,
2014 Certificate, Customer Service Specialist,
Certificate, Industrial Drafting, Seminole County
Vocational Education Department
Certification Certificate, Network+, CompTIA / Certificate, Scrum Product Owner, International Scrum Institute
Certificate, Customer Service Specialist
Certificate, 10-Hour OSHA Construction Safety
and Health, 2012
50%
Availability
Electronic Operation
Manual (EOM)
City of Modesto, CA
Project manager. The project continues
long-standing services in support of the City’s multi-facility O&M information system. The City’s on-premises SharePoint servers have reached end of life support by Microsoft. Steve's work includes:
ƒ Advising and leading EOM design and implementation
of the EOM system.
ƒ Developing a plan that will migrate the EOM to the City’s SharePoint Online tenant.
ƒ Converting to SharePoint’s Modern architecture.

Agency-wide O&M
Manual Updates
Inland Empire Utility Agency, CA
Project manager. This project will update
two of IEUAs wastewater treatment plant
O&M manuals and more than 200 standard operating procedures (SOPs). Steve's work includes:
ƒ Leading a multi-discipline team of engineers, operation specialists and EOM developers to perform data research, operational practices and capital improvement projects to update the O&M documentation. ƒ Leading the design of a SharePoint Online system and procedures for IEUA to access and manage their updated information.

Relevant Experience
Role: Project Manager
Completion Date: 2024 (est.)
Commitment: 20%
Firm: Carollo
Cost: $518,000 (multiple
projects/tasks)
Client Contact: Ben Koehler,
Wastewater Operations Manager
1221 Sutter Avenue
Modesto, CA 95354
209-342-4502
Role: Project Manager
Completion Date: 2027
Commitment: 10%
Firm: Carollo
Cost: $2M
Client Contact: Alan Lau,
Senior Associate Engineer
6075 Kimball Avenue
Chino, CA 91708
909-993-1630
#1..
- 31 -

PROJECT TEAM AND EXPERIENCE
5 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Steve Snell – Relevant Experience
Electronic O&M Manual
Victor Valley Water Authority, CA
EOM lead. This EOM integrates all the
Authority's wastewater and reuse treatment
facilities. The project included all vendor
O&M manuals, record drawings, equipment
data, and the Authority's SOPs. Equipment data integrates with Lucity CMMS.

Steve's work included:
ƒ Facilitating design workshops with Authority stakeholders. ƒ Leading the EOM content development team producing O&M information. 80-mgd Fresno-Clovis
Regional Water Reclamation
Facility Electronic Information
Management System and 80-
mgd Southeast WTP
City of Fresno, CA
Project manager. The project involved design and implementation of a SharePoint system with data integration between the City's Infor Enterprise Asset Management (EAM) system. The integration provides services for sharing data and functionality of the CMMS Work Order managed in the Infor (EAM) Oracle database. Steve's work includes:
ƒ Expanding the SharePoint system for the new Carollo designed 80-mgd Southeast Ozone WTP.
ƒ Migrating and upgrading to move the EIMS to a City-owned server and update Power Automate solutions for notification and integration functions.

Interactive Operation
Manual (IOM)
City of San Bernardino, CA
Project manager. This project converted
and updated three plant-wide O&M Manuals
(PWOMMs). The project will bring outdated hard copy O&M manuals up to date with current plant and collection system configuration and operation. The City chose Carollo’s SharePoint solution, which is under development to concurrently produce interactive operation manuals for an advanced WWTP. Steve's work includes:
ƒ Designing and implementing a SharePoint system with data integration between the City's Maximo® Computerized Maintenance Management system (CMMS).
ƒ Rapid Infiltration and Extraction Tertiary Plant and a collection system comprising of 12 lift stations.

Role: EOM Lead
Completion Date: 2019
Firm: Carollo
Cost: $350,000
Client Contact: Latif Laari,
Environmental Compliance Manager
20111 Shay Road
Victorville, CA 92394
760-954-5083
Role: Project Manager
Completion Date: 2025 (est.)
Commitment: 10%
Firm: Carollo
Cost: $1.2 million
Client Contact: Kevin Stewart,
Director of Water Reclamation
399 Chandler Place
San Bernardino, CA 92408
909-454-5651
Role: Project Manager
Completion Date: 2024 (est.)
Commitment: 10%
Firm: Carollo
Cost: $550,000 over multiple projects
Client Contact: Timothy Tompsett,
Wastewater Manager,
5607 W. Jensen Avenue
Fresno, CA 93706
559-621-5210
#1..
- 32 -

PROJECT TEAM AND EXPERIENCE
6 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Steve Walker

QA / QC / SOP

DEVELOPMENT LEAD
Steve has 40 years of experience in the operation and management of wastewater treatment facilities. He brings a unique owner’s perspective to plant operations from his experience in both private industry and municipalities. Additionally, he is a key member of our Operations Assistance Group, assisting project managers nationwide.

Work History Carollo Engineers: 15 years
Metro Water Recovery, Denver,
Colorado: 25 years
Education BS Technical and Industrial Administration,
Metropolitan State College of Denver, 1997
AAS Water Quality Management, Red Rocks
Community College, 1990
Certification Grade IV Wastewater Treatment Plant
Operator, California
Certified Water Professional (CWP)
50%
Availability
Role: Operations Specialist
Completion Date: 2021
Firm: Carollo
Cost: $182,000
Client Contact: Ben Koehler,
Wastewater Operations Manager
1221 Sutter Avenue
Modesto, CA 95354
209-342-4502
Role: Operations Specialist
Completion Date: 2016
Firm: Carollo
Cost: $55 million
Client Contact: Martin Alvis,
Operations Manager
6450 York Street
Denver, CO 80229
303-286-3000
WWTP Operations
Guidance Program
City of Modesto, CA
Operations specialist. This project
involved developing work and process
related facility documentation to establish
operational awareness.

Steve's work included:
ƒ Developing Area Management Plans for each unit
process and Sutter and Jennings.
ƒ Working with WQC Plant Manager to develop
the baseline WIMS database.
ƒ Providing awareness training for O&M and Lab supervisors.

Owner’s Advisor, Northern
Treatment Plant
Metro Water Recovery, Colorado
Operations specialist. Carollo served as
Owner’s Advisor on the Northern Treatment
Plant Program, which included Metro Water
Recovery first progressive design-build
project, including a regional advanced wastewater treatment facility and transmission facilities to serve the Denver metropolitan area.

Steve's work included:
ƒ Drafting 200-plus SOPs for a greenfield treatment plant. ƒ Developing Area Procedures and Expectations for each unit process. ƒ Working with Carollo and District staff to integrate the developed materials into the Electronic Operating Manual.

Relevant Experience
#1..
- 33 -

PROJECT TEAM AND EXPERIENCE
7 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Steve Walker – Relevant Experience
Facility Management
Training and
Development Services
Albuquerque Bernalillo County Water
Utility Authority, NM
Principal operations specialist. Provided
guidance to eliminate ammonia and nitrate related permit violations.

Developed initiatives to address the gaps, and trained staff on use.

Steve's work included:
ƒ Conducting gap analysis to determine steps to improve operations and maintenance of the WRP.
ƒ Developing initial Facility Operating Plan.
ƒ Developing Area Procedures and Expectations for each unit process.

Phase 2 Biological
Nutrient Removal/Tertiary
Treatment Facility
City of Modesto, CA
Operations specialist. This 12.6-mgd
project included a primary effluent pump
station, rotary drum fine screens, three new nitrifying/denitrifying aeration basins, turbo blowers, mixed liquor fine screens, six membrane bioreactors, 80-mgd return activated sludge pump station, in-channel UV system, and effluent/utility water pump station.

Steve's work included:
ƒ Developing startup procedures for the Activated Sludge process. ƒ Delivering site-specific Biological Nutrient Removal training. ƒ Improving operational and performance awareness through facility documentation.

Role: Principal Operations Specialist
Completion Date: 2018
Firm: Carollo
Cost: $500,000
Client Contact: Kenny Lipe,
Wastewater Superintendent
4201 2nd Street SW
Albuquerque, NM 87105
505-289-3412
Role: Operations Specialist
Completion Date: 2018
Firm: Carollo
Cost: $130 million construction
$10 million Carollo design/ESDC
Client Contact: Will Wong,
Director of Utilities
1010 Tenth Street, Suite 4600
Modesto, CA 95354
209-571-5801
#1..
- 34 -

PROJECT TEAM AND EXPERIENCE
8 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Justin O’Brien

SOP DEVELOPER/SUPPORT
Justin has 16 years of experience in wastewater operations, wastewater process optimization, writing manuals and SOPs, wastewater water quality assessment studies, industrial wastewater operations, stormwater monitoring, and environmental studies. He has and maintains a California Grade 5 Wastewater Treatment Operator certification and a Grade 3 Advanced Water Treatment Operator certification.

Work History Carollo Engineers: 2 years
Other firms: 6 years
Municipal: 8 years
Education MS Water Resources and Environmental
Engineering, Villanova University, 2016
BS Biology, Eastern University, 2006
Certification Wastewater Treatment Plant Operator,
Grade 5, California
Advanced Water Treatment Operator (AWTO),
Grade 3, California
Role: SOP Developer
Completion Date: 2023
Firm: Carollo
Cost: $6 million
Client Contact: Rodrigo Belisario
Vignau Loria, Project Manager
601 Canal Blvd.

Richmond, CA 94804
510-367-2228
Role: SOP Developer
Completion Date: 2024
Firm: Carollo
Cost: $40 million
Client Contact: Rodrigo Belisario
Vignau Loria, Project Manager
601 Canal Blvd.

Richmond, CA 94804
510-367-2228
SBS Facility
Improvements Project
Veolia North America, Richmond, CA
SOP Developer. The project involved
upgrades to the Sodium Bisulfite Facility
and the effluent structures. A new updated
operations manual was written for the
upgrades. Justin's work included:
ƒ Developing a final paper copy of the Operations Manual including:
» Disinfection.
» Dechlorination.
» Effluent structures.
» Electrical and Control Systems.

Richmond WWTP Critical
Improvements Project
Veolia North America, Richmond, CA
SOP Developer. The project involved
critical upgrades to the upstream processes
at the Facility. A new updated paper copy
operations manual was written for the
upgrades. Justin's work included developing a final pa
per copy of the Operations Manual including:
» Influent Junction Structure.
» Screenings.
» Grit Removal System.
» Odor Control System.
» Primary Sedimentation.
» Aeration System.

Relevant Experience
50%
Availability
#1..
- 35 -

PROJECT TEAM AND EXPERIENCE
9 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\01-ProjectTeamandExperience CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Justin O’Brien – Relevant Experience
Confidential Snack Packaging Client
San Bernardino County, CA
Operations Support Staff. The primary
objective of the reuse project is to achieve
major savings in water usage by treating the
process wastewater to potable quality and
reusing the clean water unrestricted within
the manufacturing facility. Justin's work
includes:
ƒ Daily operations of the advanced water treatment facility. ƒ Maintaining chemical inventory, and all other consumables. ƒ Staffing and scheduling.
ƒ Preventative and corrective maintenance.
ƒ Staff training.

City of San Diego
PureWater Project
San Diego, CA
SOP Developer. The project involved a
brand new Advanced Water Treatment
Facility. The new facility will include
an online platform-based Electronic
Operations and Maintenance Manual (EOMM) and training of the operators. Justin's work includes:
ƒ Developing Prototype Chapter and engaging the operations staff for feedback through a workshop.
ƒ Drafting EOMM Content Development.
ƒ Finalizing EOMM Content Development.

Colton-San Bernardino
Rapid Infiltration and
Extraction Treatment Facility
Manual Update
City of San Bernardino, Colton, CA
SOP Developer. The project involved writing
an updated operations manual for the existing RIX Facility. To complete the task an onsite investigation was needed to collect all the information about what has been upgraded since the original 1998 manual. An EOMM was developed to include all the upgrades. Justin's work includes:
ƒ Developing a draft EOMM of the Operations Manual, then get feedback from operational staff.
ƒ Developing a final EOMM of the Operations Manual, then get feedback from operational staff.

Role: Operations Support Staff
Completion Date: 2027 (est.)
Commitment: 10%
Firm: Carollo
Cost: $6.7 million
Client Contact: Mary Gomez, Senior
Sustainability Principal Engineer
7701 Legacy Drive
Plano, TX 75024
972-334-2061
Role: SOP Developer
Completion Date: 2025 (est.)
Firm: Carollo
Commitment: 50%
Cost: $38.5 million
Client Contact: Anthony Van,
Project Manager
525 B Street, Suite 300
San Diego, CA 92101
858-292-6492
Role: SOP Developer
Completion Date: 2025 (Est.)
Firm: Carollo
Commitment: 10%
Cost: $1.2 million
Client Contact: Ryan Nielsen,
Plant Manager
1990 Agua Mansa Road
Colton, CA 92324
909-453-6261
#1..
- 36 -
Proposed Scope
of Services
#1..
- 37 -
10 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\02-ProposedScopeofServices CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Carollo has reviewed the City’s proposed scope and
has come up with an approach to provide quality SOPs
to the City in an expedited fashion.

Approach and Understanding
The City has developed Area Management Plans
(AMP) that initially outline approximately 220 SOPs
divided into 70 Priority 1 SOPs and 150 Priority 2 SOPs for both the City of Modesto’s Sutter and Jennings
wastewater facilities and the seven-mile pipelines
connecting the two.

Our approach will deliver a comprehensive digital
library of interrelated standardized SOPs that are
integrated into the City’s existing Electronic O&M
(EOM) and Computerized Maintenance Management
System (CMMS) through linking or other means.

Since Carollo already has a good understanding of the
plant and City expectations for the SOP development,
Carollo will start with developing a standard SOP
template that will be approved by the team and be
used for all SOP development. By accomplishing this
early, SOP development can begin quicker in the
project. With our team having a good understanding
of the process, SOPs needed, and access to the EOM
manual, a majority of the SOPs can be started without
having to be onsite for days tracking down information.

This allows our engineering and operations team to
work closely together in initial development and to
help pass on the plant knowledge from our staff
and into the SOP.

Proposed Scope of Services
This scope of services summarizes Carollo’s approach and understanding to deliver Standard Operating Procedures
(SOPs) requested by the City.

A majority of the SOP can be completed in the office,
then taken onsite to review and confirm with City
operations staff. This will allow us to make better use of City O&M time by using their time to review/finalize the SOP instead of development.

It is important to have the City review the SOPs
carefully, so that accurate information is included
within them. Carollo will work with the City to have
several workshops to go through each SOP and solicit
feedback. We understand that it can be challenging
to review 220 SOPs, so by use of workshops and
submitting smaller groups of SOPs, it will allow the City to provide feedback as the project progresses.

As the SOPs are being completed a gap analysis
will be completed for the maintenance SOPs and to
determine if any of the maintenance activities or SOPs
should be included with the other plant SOPs.

Scope of Services
The City’s proposed scope in the RFP is being
followed for our scope and fee. The one task that
is being added is task 1.1, which is the project
management side of the project, including meetings,
oversight, and invoicing.
#1..
- 38 -
Project Schedule
#1..
- 39 -
11 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\03-ProjectSchedule CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Project Schedule

TASK NAME
QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1
Modesto SOPs and Training
TASK 1 - PROJECT INITIATION, MANAGEMENT,

AND COORDINATION
Meetings, oversight, and budget management
Review Background
PHASE 1 SOP DEVELOPMENT
Develop Standards
Create SOPs
Implement
Plant Maintenance Gap Analysis
PHASE 2 SOP DEVELOPMENT
Create SOPs
Implement
2024 2025 2026
Task
Summary
Start-only
LEGEND:

We have developed a preliminary project schedule that presents major tasks and their duration, as well as key project milestones. This schedule, shown below, has a starting date or notice to proceed of March 2025. Given our current knowledge of the project and the availability of our team members, we believe this schedule is realistic and achievable.

The following schedule is based on our understanding of the RFP and the information included in our proposal.
#1..
- 40 -
Level of Effort
#1..
- 41 -
12 B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\04-LevelofEffort CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Level of Effort
The level of effort estimate represents our team’s current understanding of the project. We look forward to continuing our discussions about your project. We can refine the level of effort as additional information becomes available or as needed to best meet the City's needs.

Task
No. Task Description
Senior Project EngineerProject ManagerSOP Development LeadDigital Integration LeadSOP DeveloperDocument Processing

1.0 Project Management 30 64 32 16 0 0 142

1.1 Meetings, Oversight, and Budget Management 20 48 24 8 100

1.2 Review Background 10 16 8 8 42

2.0 Phase 1 SOP Development 4 144 88 38 464 44 782

2.1 Develop Standards 4 16 8 8 36

2.2 Create SOPs 100 40 440 40 620

2.3 Implement 12 30 8 50

2.4 Plant Maintenance Gap Analysis 40 4 44

2.5 Site Visit Per Diem 16 16 32

3.0 Phase 2 SOP Development 0 320 80 60 912 80 1,452

3.1 Create SOPs 280 80 880 80 1,320

3.2 Implement 24 60 16 100

3.3 Site Visit Per Diem 16 16 32
TOTAL 34 528 200 114 1,376 124 2,376TOTAL HOURS
#1..
- 42 -
Appendix
Resumes
#1..
- 43 -
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\01- Education
BS Civil Engineering,
University of the Pacific,
2007
Licenses
Civil Engineer, California
Certification
Certificate, C2 Excavation
Safety R2, ClickSafety,
2013
Certificate, C2 Cal
Confined Spaces for
Construction, ClickSafety,
2013
Certificate, C2 Confined
Spaces, ClickSafety, 2013
OSHA 30-Hour
Construction
Professional
Affiliations
Water Environment
Federation
California Water
Environment Association
Design Build Institute of
America (DBIA)
Ryan M. Sellman, PE
Ryan Sellman has 17 years of experience, including infrastructure design in both water and wastewater, wastewater process design, civil design, facility planning, and construction management/inspection.

Relevant Experience
 Project manager for the City of Modesto, California, WWTP Operations Guidance Program. This project consisted of updating and completing the biological model for both the Jennings and Sutter Campus.

The model was then pulled into Blue Plan-it
for a digital twin of Modesto’s primary and
tertiary treatment plants.
 Project manager/owner’s advisor for the
City of Modesto SCADA System Upgrade
DB OA project. This project consists of assisting the City in getting a Design-Build team contracted and then providing oversight and design review of the SCADA conversion project. The City is changing out their HSQ system with a new SCADA system
including Allen Bradly PLCs and a Wonderware SCADA system.  Project manager for the $18 million City
of Modesto, California, Sutter Plant Headworks, Dryden Box, and Influent Flumes Improvements. The project involved replacement of two Cannery Segregation (Can Seg) screens with three new 3/8-inch continuous
climber screens and replacement of one
larger pump in the Can-Seg Pump Station
with two smaller pumps to be able to run
the Can-Seg Pump Station during lower
flows. Work also consisted of removing the
existing five bar screens, washer compactor,
and two grit washers and replacing them
with all new continuous climber screens,
washer/compactor, and grit washer.
 Resident engineer for the City of Modesto, California, Phase 2 Biological Nutrient Removal/Tertiary Treatment Facility. This

12.6-mgd project included a primary effluent pump station, rotary drum fine screens, three new nitrifying/denitrifying aeration basins, turbo blowers, mixed liquor fine screens, six membrane bioreactors, 80-mgd
return activated sludge pump station, inchannel UV system, and effluent/utility water pump station.  Project engineer and construction manager for design and construction of the City of Turlock, California, Secondary Clarifier No.
5 and Denitrification Project. The project
adds a fifth secondary clarifier to increase
capacity and improve secondary treatment
performance and modifies the existing
seven aeration basins to achieve denitrification at the City's water quality control facility. Other project elements include a mixed liquor flow distribution structure, return activated sludge pumping station, scum pumping station, additions and modifications to electrical and instrumentation systems, and
associated yard piping and paving and
grading improvements.
 Principal-in-charge for the City of Modesto, California, Sewer Trunk Rehabilitation on Grimes, Mercy, and Woodland Avenues.

Carollo is evaluating the best rehabilitation
method for these sewer trunks, which all
dealt with corrosion associated with a hydrogen sulfide attack. The project involves design of the selected rehabilitation alternative for each sewer, including cured-in-place pipe (CIPP) lining of 13,500 feet of 54-inch
of the West Trunk Sewer and 7,300 feet of
18-inch to 27-inch of the Emerald Trunk
Tributary. The project also includes hydraulic
modeling to confirm capacity requirements
for CIPP vs sliplining, coordination with the
Modesto Irrigation District and CalTrans,
and mitigation of traffic impacts due to
heavily congested traffic corridors.
 Project manager/resident engineer for
the City of Modesto, California, portion of
the North Valley Regional Recycled Water
Program Owner’s Agent services. The project consisted of a 32-mgd rehabilitated pump station, 2,800 feet of 42-inch horizontal directional drilled river crossing, 6 miles of 42-inch-diameter pipe, jack-and-bore
crossing under a highway and railroad, and
discharge to the Delta Mendota Canal
(DMC). Carollo provided the design-build
request for qualifications and request for
proposals and assisted the City in selecting
#1..
- 44 -
Ryan M. Sellman, PE
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\01- a design-build firm. Carollo also completed
design on the DMC outfall facilities and the
highway jack-and-bore crossing. During the
design and construction phase, worked
closely with the City and design-build team.

Provided construction oversight and inspection during the construction phase, including change order review, pay application review, design review, submittal and requests for information responses, coordination with
permitting agencies, and daily, monthly, and
quarterly reporting on the project to the
City.
 Design engineer for the City of Modesto,
California, Industrial Tank 13 and Pump Station. The project included a 4-MG concrete reservoir and 12-mgd pump station with hypochlorite injection and a backup generator.

Responsible for layout of the pump station
and concrete tank and design of the four
horizontal split case pumps, altitude sustaining valve, piping, bridge crane, HVAC, hypochlorite tank and pump.  Design engineer for the City of Modesto,
California, Carpenter Road Relief Trunk,
which included a Basis of Design Report to
evaluate different alternatives to provide relief to the City’s Emerald Road Trunk, which surcharges during storm events. The selected routing design saved the City more than $10 million from what was shown in
the Master Plan. Duties included finding
possible alternatives and evaluating the alternatives based on cost and qualitative properties to determine the best alternative
for the City.
 Project manager for the City of Modesto, California, Jennings Plant Engineering Services. The project evaluated the water
balance for the ranch at the Jennings Road
Wastewater Treatment Plant and evaluated
the capacity of the trickling filters and pond
system to see what could be done to the
system pending a new Waste Discharge Requirement permit with stricter effluent requirements. From this project, it was determined that two facultative ponds could be removed from service.
 Project manager for the City of Modesto, California, Engineers Report Update, which updated the 2014 Master Plan
Engineering Report. The project revised the
capital improvement plan list for collections
and wastewater treatment so that new rates
could be evaluated.
 Project manager for the City of Modesto, California, Corrosion Control Project.

The project consisted of evaluating both
chemical and non-chemical options to adjust the effluent pH of the tertiary wastewater treatment plant to reduce the
corrosion of the water. Several options were
evaluated, including several dosing locations
for caustic soda. However, it was determined that the most cost-effective option to adjust the pH was to use air stripping to
strip the CO2 and raise the pH of the effluent without adding additional chemicals.  Design manager for the City of King City,
California, Wastewater Treatment Plant and
Recycled Water Facilities. The project consists of upgrading the 1.3-mgd pond treatment plant to a 1.7-mgd treatment facility that includes a new headworks, grit removal, oxidation ditches, secondary clarifiers, return activated sludge/waste activated sludge pump station, cloth media disc filters,
UV disinfection, solids dewatering, recycled
water pump station and tank, and equalization basin. The land disposal system was updated to provide new spray fields and percolation ponds. A new access road to the site was also required to allow 365
days/year access. Carollo assisted with funding, permitting, and design services.  Design engineer for the City of Roseville,
California, Pleasant Grove Wastewater
Treatment Plant Phase I Expansion, which
involved increasing the flow from 12 mgd to
15 mgd by adding primary sedimentation
basins, oxidation ditch, secondary clarifier,
return activated sludge/waste activated
sludge (RAS/WAS) pump station, fine
screens, digesters, and a thickening building. Duties included design and assisting in the design of primary clarifiers and pipe layout, oxidation ditch, oxidation ditch support structures, RAS/WAS pump station, secondary clarifier, and fine screens. Also prepared quantity take-offs for the majority of structures and compiled detailed cost estimate sheets for each area.
#1..
- 45 -
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\02- Education
MS Public Administration,
University of Phoenix, 2018
BS Environmental Science,
University of Phoenix, 2016
Certifications
Wastewater Grade 5
Operator, California
Advanced Water Treatment
Plant Operator Grade 3

CWEA/AWWA
Professional
Organizations
California Water
Environmental Association
Board Member (Monterey
Section)
Christopher G. Vasquez
Chris Vasquez has 19 years of project management and operations experience in the water industry. He has experience in navigating local, state, and federal regulations, working on capital improvement projects, process control, and optimizing wastewater treatment plant operations and maintenance. Chris also has advanced skills in asset and data management, budgeting tools and software, Operator 10, Hach Wims, Microsoft office and SQL, Antero, Maintenance Connection, MP2 Link.

Previous Experience
 Commissioning team for an MBR facility
for a confidential client in San Bernardino
County, California. Duties included developing a seeding plan for a new aeration basin, startup of the new facility, and operations
strategy.
 Project manager for an engineering
consulting firm, managing the facility at the
South County Regional Wastewater Authority, California. The 8-mgd Bardenpho facility produced Title 22 recycled water through
the use of anthracite gravity filters and UV
and chlorine disinfection. Responsibilities included client relations, presenting compliance and financial reports to board members, contract negotiations and renewals, being the legally responsible person and
Chief Plant Operator for Local/State/Federal
reports and compliance, approving invoices/purchase orders, budget preparation and management scheduling and planning,
employee development and coaching,
oversight of construction activities and
startups, and consulting with design engineers and the Authority on operations and maintenance concerns during design, construction, and commissioning.  Operations consultant for Laguna
County Sanitation District, California. He
provided startup support and staff training
for the new aeration basins and clarifiers.

Chris developed a process workbook that
operations use to manage the process. The
workbook calculates aSRT, wasting rates,
RAS return rates, and tracks key process indicators to aid with process control.  Chief Plant Operator for American Valley
Community Services District. Chris provided
QA/QC on state reports and trained staff on
process control, troubleshooting, and
proper sample collection, Chris Prepped the
operators for their California wastewater
exam.
 Startup services for the City of Richmond
Wastewater Treatment Facility. Composed
the strategic plan for starting up aeration
basins converted from surface aeration to
fine bubble diffusers. Chris developed a
process workbook that operations use to
manage the process. The workbook calculates aSRT, wasting rates, RAS return rates, and tracks key process indicators to aid with
process control.
 Project manager for contract operations
of an advanced water treatment facility. The
facility includes a DAFT, primary clarifier, EQ
basin, activated sludge bioreactor, ultrafiltration, activated carbon filters, RO membranes, UV disinfection, pH adjustment, and chlorination.
 Chris provided operation and troubleshooting training to the Town of Crested Butte. Chris conducted classroom and
hands-on training for the Town’s new solids
handling process. Chris trained the staff on
optimizing the rotary drum thickener and
troubleshooting the polymer dosing system.
 Instructor for the Gavilan Community
College, California, Water Resource Management Program. Taught Intro, Beginning, and Advanced Wastewater Treatment, Industrial Safety, Advanced Water Treatment (drinking water), and Wastewater Collection
Systems.
 Lead operator for the City of Clovis, California, Water Reclamation Facility. This 2.8- mgd MBR facility used UV disinfection for
Tittle 22 recycled water and surface water
discharge. Responsibilities included supervising and training operators, preparing process reports, process control, micro exams, plant operation and maintenance optimization, scheduling maintenance using CMMS, and record keeping.
 Senior wastewater treatment operator
for the City of Fresno, California 80-mgd
#1..
- 46 -
Christopher G. Vasquez
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\02- Conventional Wastewater Treatment Facility
(RWRF) and the Sequence Batch Reactor
North Fresno Wastewater Reclamation Facility (NFWRF). Responsibilities included process control of both the RWRF and NFWRF facilities, and annual startup and shutdown
of the NFWRF facility, Chris worked with engineers and contractors on current and future projects, assisted with operation’s budget/purchasing, gave direction to senior
operators regarding construction and current project demands, conducted start-up and performance testing of new equipment/processes, scheduled shutdowns for tie ins, and prioritized work orders for the
maintenance department. Chris conducted
the start-up of centrifuges for commissioning and provided an operations strategy. He provided SOPs for operating centrifuges,
polymer systems, cake pumps, and silos.
 Process Consultant at the City of Simi
Valley Water Quality Control Plant (WWTP).

Evaluated process concerns and provided
recommendations for sampling, MLSS control, and process strategies to bring the plant back into compliance. Chris provides
ongoing operational support and data review of newly installed equipment and processes.  Project management team for the City
of Houston, Texas, 320-mgd Northeast Water Purification Plant. Witnessed and provided input on equipment/system testing and commissioning activities.
 Construction management team for the
City of Gilroy, California, South County Regional Wastewater Treatment and Reclamation Facility. Chris provided insight and operational review of start-up and shutdown plans, commissioning activities, and bypass
planning.
 Owner’s advisor for the City of Morro
Bay, California. Provided operational support for process control and equipment startup. Provided a drain and clean plan for
taking the City’s old wastewater treatment
facility offline. Provided assistance with old
facility clean up after a severe storm caused
flooding. Developed a staffing analysis and
standard operating procedures for the indirect potable reuse facility. Worked with owner and contractor to finalize an acceptance test for the indirect potable reuse facility.
 Operations and maintenance training for
the City of Sunnyvale, California, Headworks
and Primary Sedimentation Basins. Provided
Area Management Plans that outline the
operations and maintenance of each process and associated equipment. Chris provided training to operations, maintenance, laboratory staff, and management.
 Operations evaluation for the City of
Gallup, New Mexico, Wastewater Treatment
Plant. Chris was asked to evaluate the current state of the facility as they were struggling to meet permit. An upgrade that converted the primary clarifiers into a grit removal system was not performing as intended. Chris evaluated the site and made recommendations to improve the operation
of the grit removal system. He also recommended how staff could block the flow to perform maintenance on the grit clarifiers.

The isolation gates had significant leaks preventing staff from isolating the equipment for maintenance.

Operational support for the City of Santa Fe,
New Mexico. The City had an issue with elevated E.coli in the effluent of the wastewater treatment facility. Chris conducted a site
evaluation and provided feedback on potential causes. He also coordinated additional sampling on behalf of the City. #1..
- 47 -
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\03- Education
AS Information
Technology, Valencia
College, 2015
AS Computer
Information Systems,
Valencia College, 2014
Certificate, Customer
Service Specialist,
Certificate, Industrial
Drafting, Seminole
County Vocational
Education Department
Certification
Certificate, Network+,
CompTIA
Certificate, Scrum
Product Owner,
International Scrum
Institute
Certificate, Customer
Service Specialist
Certificate, 10-Hour
OSHA Construction
Safety and Health, 2012
Professional
Affiliations
American Water Works
Association
Project Management
Institute
Water Environment
Federation
Stephen T. Snell
Stephen Snell brings 38 years of experience developing, consulting, and managing data analysis, information systems, and training solutions for public utilities and department of defense sectors. He is Carollo’s practice lead for electronic operation manuals (EOMs). Mr. Snell's wastewater experience includes design and owner’s advisor for information systems and integration of business processes. He serves as project manager and technical lead for facility operation and maintenance information system projects including extensive data collection and analysis from multiple system and client institutional knowledge resources. Relevant experience includes the following projects.

Relevant Experience
 Project manager for the City of Modesto, California, Electronic Operation Manual (EOM). Mr. Snell is leading a project that
continues long-standing services in support
of the City’s multi-facility O&M information
system. The City’s on-premises SharePoint
servers have reached end of life support by
Microsoft and Mr. Snell developed a plan
that will migrate the EOM to the City’s
SharePoint Online tenant. The migration will
also convert to SharePoint’s Modern architecture.
 Project manager for Inland Empire Utility
Agency (IEUA), Agency-wide O&M Manual
Updates. This project will update two of
IEUAs wastewater treatment plant O&M
manuals and more than 200 standard operating procedures (SOPs). Mr. Snell leads a multi-discipline team of engineers, operation specialists and EOM developers to perform data research, operational practices and capital improvement projects to update
the O&M documentation. He will also lead
the design of a SharePoint Online system
and procedures for IEUA to access and
manage their updated information.
 Project manager for the City of Fresno,
California, for the 80-mgd Fresno-Clovis Regional Water Reclamation Facility Electronic Information Management System (EIMS),
and 80-mgd Southeast Water Treatment
Plant (WTP). Mr. Snell designed and implemented a SharePoint system with data integration between the City's Infor Enterprise Asset Management (EAM) system. The integration provides services for sharing data and functionality of the CMMS Work Order
managed in the Infor (EAM) Oracle database. Most recently, Mr. Snell led the expansion of the SharePoint system for the new Carollo designed 80-mgd Southeast Ozone
WTP. Currently, Mr. Snell is the Project Manager for a migration and upgrade project to move the EIMS to a City-owned server and
update Power Automate solutions for notification and integration functions.  Technical lead for the Victor Valley Water Authority, California, Electronic O&M Manual. This EOM integrates all the Authority's wastewater and reuse treatment facilities. Mr. Snell facilitated design workshops with Authority stakeholders and is currently
leading the EOM content development
team producing operation and maintenance information including all vendor O&M manuals, record drawings, equipment
data, and the Authority's SOPs. Equipment
data integrates with Lucity CMMS.
 Project manager for the City of San Bernardino, California, Interactive Operation Manual (IOM), to convert and update three
plant-wide Operation and Maintenance
Manuals (PWOMMs). Mr. Snell designed
and implemented a SharePoint system with
data integration between the City's Maximo® Computerized Maintenance Management system (CMMS). The project will bring outdated hard copy O&M manuals up to
date with current plant and collection system configuration and operation. The City opted for Carollo’s SharePoint solution
which is under development to concurrently
produce interactive operation manuals for
an advanced WWTP, a Rapid Infiltration and
Extraction Tertiary Plant and a collection system comprising of 12 lift stations.  Technical lead for the Willamette Water
Supply System, Oregon, Standard Operating Procedures (SOPs). For a new regional water supply system including reservoir,
#1..
- 48 -
Stephen T. Snell
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\03- pump station, transmission pipeline and water treatment plant, Mr. Snell is leading the development of a comprehensive set of
SOPs. He facilitated design workshops with
stakeholders and is currently leading the
SOP content development team producing
150 of the programs SOPs that will be integrated into their SharePoint Electronic O&M (EOM) manual.
 Project Manager Contra Costa Water
District, California, Electronic Operation
Manual (EOM). Mr. Snell is leading a project
that converts static HTML Web Pages and a
2007 SharePoint on-premises EOM to Carollo’s managed SharePoint Online solution.

This project is consolidating multiple systems and provides training for the District to manage their O&M information. Mr. Snell is
currently providing staff support for training
and configuration guidance.
 Project manager for the City of San Jose,
California, Update South Bay Water Recycling Operation Manual and conversion Electronic O&M Manual. Mr. Snell is the
project manager and lead architect for a
SharePoint ®implementation of an Electronic Operation Manual (EOM) and system Efficiency and Reliability study. He oversees
a team of staff from Carollo and the City for
day-to-day tasks and design requirements
of the EOM. When completed, the SharePoint EOM system will be hosted in by the City to manage as a living body of
knowledge.
 Information system lead for Skagit
County, Washington. Water Treatment Plant
Electronic Operations Manual (EOM). The
EOM will reflect the current operational
practices at the WTP and that can be referenced, revised, and updated by operators and other Skagit PUD staff moving forward.
 System architect for the Austin Water,
Texas, System-wide Electronic O&M Manual. Mr. Snell is leading a third expansion of the EOM that includes the City's remote facilities for collection, distribution, and reuse assets. This expansion included integration
with the City's ESRI GIS system to provide a
familiar spatial user interface for accessing
relative information. All the development
was completed via VPN on the City's onpremises SharePoint 2010 production environment.  Technical lead for the City of Chandler,
Arizona, Ocotillo Water Reclamation Facility
Electronic O&M Manual. Based on a successful EOM for the Ocotillo Brine Reduction Facility, Mr. Snell is leading the EOM design and content development. The project follows Carollo's proven software implementation process. Mr. Snell is coordinating training for the O&M information development team and will facilitate training of City staff end-users, content managers, and administrators of the EOM SharePoint system.

System design includes collaboration with
the City's Maintenance Supervisor to integrate with an existing Lucity CMMS.  Technical lead for Sarasota County, Florida, Public Utilities Department Asset Management Assistance. Mr. Snell is leading several asset management and computerized maintenance management system (CMMS) related efforts for a comprehensive
build-out of the Utility’s Asset Management
Plan and Maximo CMMS. He leads technical
workshops with stakeholders and peer consulting teams through processes to establish standards and achieve consensus. Mr. Snell
developed the asset register for a large, advanced wastewater treatment facility upgrade and established new data collection requirements that improve accuracy and
completeness from the CMAR for integration into the CMMS and SharePoint® Electronic O&M applications, and an inventory check for RPR inspections during construction. Project completion: Ongoing  Project manager for Manatee County,
Florida, Computerized Maintenance Management System (CMMS) Asset Management Analysis Software Procurement. To replace a proprietary system, Mr. Snell developed a comprehensive requirements specification through staff surveys and in-person interviews to understand current staff practices and related information systems. He designed new business workflows and developed requirements that include systems integration with SCADA, GIS, Financial and
SharePoint® Electronic O&M applications.
#1..
- 49 -
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\04-WalkerSteven.docx Education
BS Technical and
Industrial Administration,
Metropolitan State
College of Denver, 1997
AAS Water Quality
Management, Red Rocks
Community College, 1990
Licenses
Grade IV Wastewater
Treatment Plant
Operator, California
Certification
Certified Water
Professional
Professional
Affiliations
Rocky Mountain Water
Environment Association
Water Works Association
Joint Technical Activities
Committee (1996–2017)
Water Environment
Federation
Colorado Water and
Wastewater Plant
Operators Certification
Board Member (2009–
2017)
Steven J. Walker, CWP
Steven Walker, with 40 years of experience in the operation and management of wastewater treatment facilities. Mr. Walker served as Carollo's Operations Assistance Group Leader, and as such, he directed the efforts of our licensed clean water specialists. Mr. Walker previously served on the State of Colorado’s Water and Wastewater Operators Certification Board. Additionally, Relevant Experience
 Operations specialist for the City of
Modesto, California, WWTP Operations
Guidance Program. Performed vulnerability
assessments focusing on achieving operational excellence. Provided mentorship and guidance for improving facility documentation and work practices. Developed Area Management Plans for each unit process.

Steve worked with the Chief Plant Operator
to identify desired Standard Operating Procedures (SOPs), improve data collection and review, and populate the WIMS program
with useful information.
 Operations specialist for Metro Water
Recovery, Colorado, Northern Treatment
Plant. Developed about 200 SOPs and other
content for the Electronic O&M Manual.
 Principal operations specialist and project lead for the Albuquerque Bernalillo County Water Utility Authority, New Mexico,
Facility Management Training and Development Services. Performed vulnerability assessments ranging from documentation such as facility operating plan and Area Procedures and Expectations, through process control and database upgrades and into
training.
• For the Facility Management Training
and Development Services, provided
guidance to eliminate ammonia and nitrate related permit violations. Developed initiatives to address the compliance gaps, and trained staff on use. The Southside Water Reclamation Plant is
now a NACWA award-winning facility.
• He conducted gap analysis to determine steps to improve operations and maintenance of the WWTP. He also conducted staffing analysis to align operations staffing with facility requirements to optimize personnel.
• For the Dewatering Replacement
project, developed work restrictions and
contingency plans, equipment layout
and access guidance, and startup and
optimization training.
• In addition, he developed comparable initiatives and training at the water treatment plant, including process-focused procedures and awareness for the ozone contact system.
 Operations specialist for the City of
Modesto, California, Phase 2 Biological Nutrient Removal/Tertiary Treatment Facility.

This 12.6-mgd project included a primary effluent pump station, rotary drum fine screens, three new nitrifying/denitrifying
aeration basins, turbo blowers, mixed liquor
fine screens, six membrane bioreactors, 80-
mgd return activated sludge pump station,
in-channel UV system, and effluent/utility
water pump station. Steve developed the
startup plan for the activated
sludge/MBR/and UV processes.
 Operations specialist for the City of Turlock, California, Secondary Clarifier No. 5 and Denitrification Project. The project
added a fifth secondary clarifier to increase
capacity and improve secondary treatment
performance and modifies the existing
seven aeration basins to achieve denitrification at the City's water quality control facility.

Steve trained the Operations staff on process control for Biological Nutrient Removal compliance.
 Operations specialist for the City of Riverside, California, Regional Water Quality Control Plant. Coordinating O&M activities
and process optimization with $192 million
Capital Improvements by improving process
awareness through comprehensive sampling, data collection, and analysis review. • For the Master Plan, provided staffing and workload analyses for all work #1..
- 50 -
Steven J. Walker, CWP
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\04-WalkerSteven.docx Awards
William D. Hatfield Award
for Outstanding
Performance and
Professionalism, Water
Environment Federation,
2005, Operation of a
Wastewater Treatment
Facility
“You have had a
positive impact on
myself and staff.

We were spending
a lot of time trying
to figure it out,
which was
exhausting. You
gave us the tools
and mindset to be
successful and now
we are unstoppable,
even with limited
staff.”
- David Huff, Water
Quality Control
Division Manager,
June 2019
groups – administrative, engineering,
regulatory compliance, collections, and
O&M. The analyses provided justification
to realign staff with facility needs.
 Operations specialist for Hillsborough
County’s Valrico Advanced Wastewater
Treatment Plant, Brandon, Florida. Conducted gap analysis on facility O&M and work practices for bond holders due to ongoing effluent permit violations. Identified O&M shortcomings and wrote SOPs for
each unit process.
 Operations specialist for the East Bay
Municipal Utilities District (EBMUD) Energy
Independence Program - Solar 50 Turbine
Installation, Oakland, California. Wrote SOPs
to integrate the Solar 50 turbine and its supporting systems into daily operation.  Operations coordinator for the San Jose
Santa Clara Regional Wastewater Facility,
California, CIP Program O&M Coordination
Support. Developed O&M coordination
support for the $2 billion CIP program including methodology, tools, and procedures to integrate O&M input into project designs
(design-bid-build and progressive designbuild) and establish methods to ensure the plant achieves permit criteria. Steve developed a comprehensive Shutdown Coordination plan to execute project-driven shutdowns. He also developed an annual operations plan and recorded existing process operating strategies and isolation constraints. Notably, he also provided O&M perspective for the 2011 Facility Master Plan.
 Operations specialist for the City of
Sunnyvale, California 2016 Facility Master
Plan. Provided O&M direction and developed control strategies for the new Headworks and Flow Diversion structures. He developed a staffing reorganization plan to proactively realign O&M staff with changing
process footprints, improved automation,
and increased instrumentation.
 Operations specialist for City of Greeley’s
Greeley WPCF Master Plan and Nitrification
Phase II projects.
• For the Master Plan, provided a staffing assessment that forecasted required skills and positions with capital improvement projects. Provided a security assessment of external and internal components.  Operations specialist for the Region of
Peel, Toronto, Canada, for the Wastewater
Emergency Response Plan. Performed vulnerability assessment focused on ensuring the operational plans and procedures have
continuity and meet industry norms to
guide staff through atypical tasks.
 Operations specialist for the Toho Water
Authority, Kissimmee, Florida, Wastewater
Facilities Operational Audit. Comprehensive
operational audit of six of the eight
wastewater treatment facilities (South Bermuda, Camelot, Harmony, Lake Marion, Cypress West, and Sandhill Road). The goal of the audit was to identify work practices and
high impact capital needs that could potentially impact discharge permit compliance, excessively increase process variability, or result in unplanned operation and maintenance expenses.  Operations specialist for the Eagle River
Water and Sanitation District, Vail, Colorado.

Focus areas included optimizing existing
treatment processes, improving process
awareness, and improving staff training.
 Operations specialist and owner's advisor for the Hi-Desert Municipal Water District in Yucca Valley, California, Wastewater Reclamation Facility. Interim operator-in-responsible charge and startup and commissioning specialist for the greenfield MBR advanced wastewater treatment plant. Developed performance measurement metrics and reporting, staff training modules, process optimization and staff accountability means.
#1..
- 51 -
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\05- Education
MS Water Resources and
Environmental
Engineering, Villanova
University, 2016
BS Biology, Eastern
University, 2006
Licenses
Engineer-in-Training, CA
Certification
Wastewater Treatment
Plant Operator Grade 5 –
CA
Advanced Water Treatment Operator Grade 3,
CA
Justin O’Brien, MS, EIT
Justin O’Brien has 16 years of experience in wastewater operations, wastewater process optimization, writing manuals and SOPs, wastewater water quality assessment studies, industrial wastewater operations, stormwater monitoring, and environmental studies. He has and maintains a California Grade 5 Wastewater Treatment Operator certification and a Grade 3 Advanced Water Treatment Operator certification.

Relevant Experience
 Wrote the operations manual for The
City of Richmond, CA for two separate upgrades that Carollo had completed in 2023 and 2024. The deliverable was a final paper
copy of the Operations Manual based on
the contract documents (control strategy
and drawings).
 Developed an Electronic Operations and
Maintenance Manual (EOMM) for the City
of Colton-San Bernardino Rapid Infiltration
and Extraction Treatment Facility (RIX). The
project involved writing an updated operations manual for the existing RIX Facility. To complete the task an onsite investigation
was needed to collect all the information
about what has been upgraded since the
original 1998 manual. An EOMM was developed to include all the upgrades and store all relevant documents such as drawings,
control strategies, vendor manuals and
more.
 Developed an Electronic Operations and
Maintenance Manual (EOMM) for the City
of San Diego’s PureWater Facility. The project involved a brand new Advanced Water Treatment Facility. The new facility will included an online platform based Electronic Operations and Maintenance Manual
(EOMM) and training of the operators.
 Operations support staff for a confidential a snack packaging client in San Bernardino County, California. The primary objective of the reuse project is to achieve major savings in water usage by treating the process wastewater to potable quality and reusing the clean water unrestricted within the manufacturing facility. Justin's work includes
daily operations of the advanced water
treatment facility, maintaining chemical inventory, and all other consumables, staffing and scheduling, preventative and corrective
maintenance, and staff training.
 Environmental Scientist for the City of
Philadelphia Water Department. Justin investigated new process instrumentation and procured equipment for wastewater laboratories. He also troubleshooted laboratory problems, designed sampling regimes, investigated lab data quality, and standard operating procedures for the WPCP, as well
as, worked with WPCP’s Operations group
regarding optimization and process control,
both liquid and solid streams.
 Staff Engineer for the Aeration Rehabilitation project at the San Jose-Santa Clara Regional Water Treatment Plant. During
phase one of the project, Justin participated
with a small team to collect composite and
grab samples and prepare the samples for
lab analysis as part of a wastewater characterization of the liquid and solid streams at the plant. The data derived from this characterization went into building a BioWin model of the facility. The BioWin model
helped determine the oxygen consumption
by the bacteria in the aeration tanks and allowed for proper design of the new blower and air delivery system.
 Staff Engineer for the San Francisco Public Utility Commission (SFPUC) Biosolids Management System. Justin assisted with
the internal audit and worked alongside the
operations staff to manage the hauling of
biosolids from SFPUC’s Southeast and
Oceanside WWTPs. He provided insights for
contract negotiations concerning the upcoming hauling contract renewal. He also conducted field investigations and performed data analysis on the haul-out of biosolids for operations to optimize the economics of the trucking operations. As part of the team, he helped design the biosolids
upgrade at the Southeast plant, as well as,
the design of the ferric chloride chemical
addition system by providing excel spreadsheet diagrams showing elevations of entire pipelines to identify key points for vent and
#1..
- 52 -
Justin O’Brien, EIT
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Resumes\05- drain additions. On a separate task for the
SFPUC Biosolids project, he put together a
process tool on excel for determining the
solids loading of the pre-thermal hydrolysis
process as part of the Cambi system. The
process tool was designed to look at different loading rates and number of operating equipment, as well as wet well levels and
percent solids. An additional task on the
project was to work alongside the Information Technologist in the company to keep a database for the project of all the
decisions made during the 5-year design
phase of the project until 100% design was
finished.
 Staff Engineer and Field Technician for
the San Diego’s North City Scalping WWTP.

He assisted with a biological evaluation of
the facility. The facility had had a major upset and was part of a team evaluating the chemistry and biology of the system to determine the cause of the upset. On a separate project, he installed water quality instrumentation at the headworks and secondary effluent of the facility in an effort to understand the diurnal loadings of indicator water quality parameters such as BOD, COD, TSS,
pH, temperature, and conductivity. This project is phase one of an Enhanced Local limit investigation aiming to track the fate and
transport of many drinking water regulated
water quality parameters in the sewershed.

Installed and maintained the field water
quality instrumentation, also coordinating
with a contract lab to calibrate the instrumentation.
 Staff Engineer, performed Engineering
Assessment of Shell’s Industrial wastewater
treatment plant (IWTP) and well as worked
with a team to write an O & M Manual for
the IWTP.
 Staff Engineer for Truckee Meadows
Water Reclamation Facility’s Alternative
Analysis. Justin is a part of a team performing tasks that will be evaluating alternative locations to install primary fine screens. He
was also tasked with determining the best
alternative technologies and process equipment to reduce the total dissolved solids discharged into the Truckee River. For that
analysis, advanced treatment methods were
looked into such as ultra-filtration, reverse
osmosis, and the evaporation and hauling
of salts. The final deliverable for this task was
an addendum to the Alternative Analysis report including a description of the recommended process equipment, including process diagrams, the benefits that they would provide, and a class 5 cost estimate of the
process.
 Environmental Scientist for the City of
Philadelphia’s three Water Pollution Control
Plants (WPCPs). Justin researched nitrification and ammonia removal and investigated the dynamics of nitrogen species through
the primary and secondary treatment trains
and whether there was optimization potential for ammonia removal without capital improvement projects being implemented.

The role also included trialing new handheld
and in-situ instrumentation and then developing a quality control program for the new instrumentation for regular use. He was responsible for writing reports, executive summaries, fact sheets and delivering presentations on the subject matter and also assisted with a complimentary BioWin model of the
Northeast WPCP attempting to mimic the
process changes and ammonia dynamics
seen in the facility.
 Conducted an Engineering Assessment
at Shell refinery in Martinez, CA of their
wastewater systems. The assessment was
aimed at highlighting the most critical elements that needed attention to continue to meet environmental regulations.
 Participated in supporting operations
accompanying the newly constructed Water
Recycle Facility. The contract to operate the
facility for a term of 3 years. Carollo currently serves as the Chief Plant Operator (CPO) for the facility. Operations subcontractor provides certified operators for staffing on a weekly basis.

Field Lead for the California Department of
Transportation (Caltrans) Stormwater Monitoring Program. Justin worked as a field technician and internal project manager and
was responsible for collecting stormwater
samples during storm events and installing,
maintaining, and troubleshooting monitoring equipment in the field, and analyzing the field and lab data.
#1..
- 53 -
Appendix
Contract Comments
#1..
- 54 -
B:\Pursuits\Client84(SAC)\Modesto\SOPDevelopment\Prop1124\Indd\Appendix-ContractComments CITY OF MODESTO / PROPOSAL RFP 2324-99

STANDARD OPERATING PROCEDURES DEVELOPMENT
CAROLLO / PROPOSAL / NOVEMBER 2024
Contract Comments
Carollo requests that the same changes/additions
that were previously used in our past contracts with
the City of Modesto also be made to this contract.

Those changes/additions include the following.
ƒ Section 4: Add the following new paragraphs to
the end of the section:
“In providing opinions of cost, financial
analyses, economic feasibility projections, and
schedules for potential projects, Consultant
has no control over cost or price of labor and
material; unknown or latent conditions of existing
equipment or structures that may affect operation
and maintenance costs; competitive bidding
procedures and market conditions; time or
quality of performance of third parties; quality,
type, management, or direction of operating
personnel; and other economic and operational
factors that may materially affect the ultimate
project cost or schedule. Therefore, Consultant
makes no warranty that the City’s actual project
costs, financial aspects, economic feasibility, or
schedules will not vary from Consultant’s opinions,
analyses, projections, or estimates.

Consultant is not responsible for damage or
delay in performance caused by events beyond
the reasonable control of Consultant. In the
event Consultant’s services are suspended,
delayed, or interrupted for the convenience of
the City or delays occur beyond the reasonable
control of Consultant, an equitable adjustment
in Consultant’s time of performance and cost of
Consultant’s personnel and subcontractors
may be made.”
ƒ New Section 5: Add the following new section,
renumbering subsequent sections:
“5. OBLIGATIONS OF CITY. The City shall furnish
Consultant available studies, reports, and other
data pertinent to Consultant’s services; obtain
or authorize Consultant to obtain or provide
additional reports and data as required; furnish
to Consultant services of others required for the
performance of Consultant’s services hereunder,
and Consultant shall be entitled to use and rely
upon all such information and services provided
by the City or others in performing Consultant’s
services under this agreement.

The City shall arrange for access to and make
all provisions for Consultant to enter upon public
and private property as required for Consultant to
perform services hereunder.”
ƒ Section 7 (after renumbering): Add the following
new paragraph to the end of the “Ownership of
Documents” subsection:
“Documents, including drawings and
specifications, prepared by Consultant pursuant to
this assignment are not intended or represented
to be suitable for reuse by the City or others for
this Project or on any other project. Any reuse
of completed documents or use of partially
completed documents without written verification
or concurrence by Consultant for the specific
purpose intended will be at the City’s sole risk and
without liability or legal exposure to Consultant.”
ƒ Section 15 (after renumbering): In the first
paragraph, 5th line, replace “material change”
with “reduction.”
ƒ Section 17 (after renumbering): Add the following
to the end of the first paragraph:
“In no event shall the cost to defend charged to the
Consultant exceed the Consultant’s proportionate
percentage of fault. However, notwithstanding the
foregoing, in the event one or more defendants
is unable to pay its share of defense costs due
to bankruptcy or dissolution of the business, the
Consultant shall meet and confer with other parties
regarding unpaid defense costs.”
ƒ New Section 27 (after renumbering): Add the
following new section to the end of the agreement:
“27. THIRD PARTIES. The services to be
performed by Consultant are intended solely for
the benefit of the City. No person or entity not a
signatory to this Agreement shall be entitled to
rely on Consultant’s performance of its services
hereunder, and no right to assert a claim against
Consultant by assignment or indemnity rights or
otherwise shall accrue to a third party as a result of
this Agreement or the performance of Consultant’s
services hereunder.”
#1..
- 55 -
carollo.com
#1..
- 56 -
#1..
- 57 -
#1..
- 58 -

UTILITIES DEPARTMENT
Wastewater Division
P.O. Box 642
Modesto, California 95353
209.577.6200
Modestogov.com
September 23, 2024
SUBJECT: Request for Proposal (RFP) 2324-99 Standard Operating Procedures Development
Dear Consultant:

The City of Modesto (Modesto) is soliciting Request for Proposals (RFPs) from Modesto’s prequalified list of Engineering firms for a comprehensive suite of Standard Operating Procedures (SOPs) for both the City of Modesto’s Sutter and Jennings water recycling facilities and the sevenmile pipeline connecting the two.

If you wish to be considered for this work, please submit one (1) electronic copy and five (5) hard copies of your proposal, and a sealed hard copy of the Cost Proposal by 4:00 p.m., Friday, November 15, 2024, to:

City of Modesto
Utilities Department, Wastewater
1010 Tenth Street, 6th Floor, City Clerk
Modesto, California 95353
Attention: Ben Koehler, Chief Plant Operator
A selection committee made up of representatives from Modesto will evaluate all Proposals submitted; however, the RFP does not commit Modesto to award a subsequent Agreement for Consultant Services, to pay for any costs incurred in preparation or presentation of the Proposal, or to procure a contract for services. Following the selection committee’s evaluation of the Proposals, interviews may be conducted, and your firm may be contacted to schedule an interview date. Afterwards, the committee may select a consultant to proceed with this project. The selection considerations for evaluating the submitted documents are included in this RFP.

This RFP contains specific instructions and requirements for preparing and submitting a Proposal.

Due to scheduling, requests to meet with Modesto staff to discuss the request for proposal will not be considered.
#1..
- 59 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 2 ends

BACKGROUND
The City of Modesto owns and operates the City’s Regional Water Recycling Facility (WRF). The WRF is permitted by the California Regional Water Quality Control Board (RWQCB), Central Valley Region (Regional Board) to discharge treated effluent to the San Joaquin River (SJR) and to the Delta-Mendota Canal (DMC). The WRF is divided into two campuses: the Sutter Campus and the Jennings Campus. The City of Modesto Regional WRF has an antiquated set of Standard Operating Procedures (SOPs) that do not completely reflect current operations. In a recent Gap Analysis, 212 suggested SOPs were identified as needing to be completed, 70 of which have been deemed high priority (SOP Priority List-Attachment 2).

The Plant Maintenace team has a small list of 9 current SOPs. A gap analysis was not performed for maintenance.

SCOPE OF SERVICES
This project will result in a comprehensive suite of Standard Operating Procedures (SOPs) for both the City of Modesto’s Sutter and Jennings wastewater facilities and the seven-mile pipeline connecting the two. The current and still being developed Area Management Plans (AMP) initially outline approximately two-hundred twenty (220) SOPs establishing a solid foundation of SOPs for both facilities and the connecting pipeline. Currently, the Wastewater Division operates from approximately fifty (50) SOPs that have aged and may not reflect current operations. The envisioned SOPs outlined in the AMP – called the 2023 SOPs - are prioritized based on critical business needs, safety and/or permit compliance. Due to the potential obsolescence of the existing SOPs, it is anticipated that at least seventy (70) Priority 1 SOPs are needed soon. A gap analysis of the Plant Maintenance procedures will also be needed, including a Technical Memo describing recommended procedures and prioritization.

The final product will result in a comprehensive digital library of interrelated SOPs that are digitally attached to various databases in use, including the Electronic O&M Manual (SharePoint), the Maintenance Connection Computerized Maintenance Management System (CMMS), the existing Lock Out/Tag Out procedures, and a future asset management system. The Digital product will provide hyperlinks within each SOP to related or called out SOPs within one SOP or another.

It is possible that SOPs that are not included in the Priority 1 list will be completed as part of this initiative. These SOPs will have to adhere to the standards developed. It is anticipated that one hundred fifty (150) Priority 2 SOPs will be required to complete the initial SOP library. Your fee should include the completion of these Priority 2 SOPs. This effort will be optional as determined by the City of Modesto, as phasing may be required to meet budget constraints. #1..
- 60 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 3 ends

The primary goals of this effort are to:

1. Standardized SOP template, format, asset naming convention, version controls, audit mechanism, defined modification procedures, and nomenclature.

2. Recommend SOP platform (i.e., software).

3. Update existing SOPs into template – pre-2023 editions (if relevant).

4. Meet and confer with City establishing project schedule and 2023 high priority SOPs – anticipated as (70) SOPs.

5. Standardized metadata of each document with the goals of:
a) Linking to the existing SharePoint Electronic O&M Manual. b) Linking to the existing Maintenance Connection CMMS. c) Linking to the existing LOTO procedures.
d) Linking to the future asset management system.
e) Searching across documents.
f) Hyperlinks within SOPs to associated SOPs.

6. Digitally connecting final SOPs to the databases where required.

7. Standardize SOP language to align with asset tags and nomenclature.

8. Standardize SOP language to align with SCADA tags and nomenclature.

9. Standardize SOP language to align with WIMS variables and nomenclature.

10. Perform Gap Analysis of existing Plant Maintenance procedures to develop a list of recommended procedures and prioritization.

Modesto is soliciting proposals to complete the following tasks:

Consultant Responsibilities:

1. Review Background:
a. Preliminary meetings with Modesto to discuss and develop roles and responsibilities for the project moving forward. Multiple meetings may be required. b. Set project goals and expectations, including expected level of effort, collaborative structure for decision making and review, and overall expected approach. Produce project schedule with major milestones and deadlines identified. c. Conduct regular progress meetings with project team to ensure goals are being met and discuss comments on all drafts of SOPs and reports. #1..
- 61 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 4 ends

2. Develop Standards:
a. Standardize SOP template, format, version control, audit process and nomenclature. Use existing asset naming conventions, if possible. b. Update existing SOPs into new standardized format if SOP is still relevant. c. Recommend SOP platform. City staff is interested in SOP management software, if recommended. Otherwise, develop SOP management process using existing tools.
d. Develop metadata standards to allow for interconnectivity to the Electronic O&M Manual, CMMS and LOTO procedures. These standards should be ready to connect to a future asset management system.

3. Create SOPs:
a. Develop a schedule to complete the priority 1 SOPs (roughly 70). b. Write SOPs using approved template and standards. Work with Plant Operations staff to confirm procedures and allow comment period on completed procedures. c. Create new SOPs with hyperlinks to other relevant documents i.e. O&M Manual, LOTO procedures, asset information, Area Management Plans, etc.

4. Implement
a. Recommend a training plan for Plant Operations staff. b. Link SOPs to relevant Area Management Plans, CMMS work orders and relevant sections of the O&M Manual.

5. Plant Maintenance Gap Analysis
a. Review existing SOPs.
b. Create Tech Memo highlighting recommended procedures and priorities.

DELIVERABLES

1. Project Schedule with milestones and deadlines identified.

2. Draft final SOPs and associated documentation for City of Modesto’s Wastewater Operations and Maintenance (O&M) staff to review and comment.

3. Workshop meeting to discuss SOPs and incorporate City comments.

4. Plant Maintenance Gap Analysis Memo
#1..
- 62 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 5 ends

5. Copy of Final produced.

6. Monthly progress payment invoices shall include the minimum attachments:
a. Detailed description or itemization of work completed for each task and the time period. Invoices should include the total cost of project, expenditures to date and balance remaining.

Project Management
The consultant shall be required to provide project management as necessary to ensure the efficient completion of the SOPs. Project management duties would include, but not be limited to: coordination of sub-consultant activities; providing updates and seeking input and direction from O&M staff, as appropriate; monitoring of project budget and schedule; prepare power point presentation(s) if needed, prepare meeting agendas, prepare meeting minutes, and preparation of other necessary attendance materials needed for meetings as directed by O&M staff.

The consultant shall communicate frequently with O&M staff, through email, informal discussions, via teleconferencing by video or live audio meetings, or in person unless otherwise directed by the Modesto’s project manager, Ben Koehler, Chief Plant Operator.

CONTENTS AND REQUIREMENTS OF THE PROPOSAL
Modesto is seeking Proposals as one single package from engineering consultant firms that demonstrate experience in providing engineering services for projects with similar magnitude and scope to the described components. The submitted material should focus on technical content that demonstrates the project experience and capability of the firm and its team.

To simplify comparisons during evaluation, information submitted shall be provided in the order listed in this RFP.

Each submittal shall include the following information:

1. COVER LETTER:

The cover letter should introduce the firm, the project manager and project team. The letter should highlight key attributes of the firm’s experience relative to the scope, the team’s approach, and the firm’s commitment to provide services to Modesto.

PROJECT TEAM AND EXPERIENCE:

The Project Team should be succinct and focus on content that demonstrates experience, capability, availability and commitment of the firm and its team. #1..
- 63 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 6 ends

Include the Project Manager, up to three key employees, agents, and sub-consultants who are anticipated to be assigned to this project. Provide a summary of the qualifications, licenses, experience, type of work to be performed, and the availability of each individual. a. Project Manager: The firm’s Project Manager will be directly responsible for and engaged in leading the required services. The Project Manager must be knowledgeable and experienced in all aspects of California wastewater regulations and compliance requirements and possess the leadership skills necessary to meet project objectives and deliverables.
b. The Project Team: The project team must demonstrate the required knowledge, experience, and availability for this project. Consultants work history will be rated on relevance to the studies and are encouraged to provide specific information in this regard including relevant and recent projects of similar scope and complexity.

Tabular formatting is encouraged for this section of your proposal.

The Project Team must Include:
(i) Name and title, years of experience with the Firm, and years of experience with other Firms
(ii) Education, degree, specializations
(iii) Active professional registration (State and discipline) (iv) Representative experience for not more than five (5) completed projects similar in scope, size, and complexity to the Project with at least one (1) completed in the last five (5) years
(v) Owner, project description, location, and completion date. If project is in progress, provided estimated completion date and level of commitment (vi) Name, address, and phone number of knowledgeable owner/client’s representative
(vii) Consultant services for which the individual was directly responsible; service/functions directly performed by individual (not just job title) (viii) Firm with which the individual was employed during project experience (ix) Project name, background, specific services performed, date completed, costs, client contact

2. PROPOSED SCOPE OF SERVICES (ONE PAGE)
The proposed scope of services should address the key items outlined in the Background and Scope of Services of this RFP and shall include the firm’s understanding of the desired #1..
- 64 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 7 ends

work. The consultant shall develop recommendations for meeting all regulatory compliance requirements and completing all SOPs.

3. PROJECT SCHEDULE (ONE PAGE)
Proposed schedule for all services necessary to complete the studies, specifying the major tasks, the expected time to complete each task, and the interdependency of the tasks.

4. LEVEL OF EFFORT (ONE PAGE)
The consultant shall provide an estimate of staff time (in hours), by tasks under Scope of Services. Include the location of the offices where task items will be performed and the percentage of work by cost, which will be performed out of those offices. Indicate local consultant participation. Actual costs shall not be indicated in this section, show percentages of the total costs. Task items indicated in the Level of Effort shall match those indicated in the Scope of Services and Fee Proposal.

It is the policy of the City of Modesto, when not prohibited by the funding source that all other factors being equal, local firms whose qualifications are satisfactory and who have sufficient experience and capabilities for providing the necessary professional services shall normally be given priority in being considered for employment by Modesto. The location of any sub-consultant firms proposed by the consultant will also be considered when applying this policy.

Requests for Clarifications, Corrections or Modifications of the Request for Proposals
Any requests for clarifications, corrections or modifications of this RFP shall be submitted by email to Ben Koehler, at [email protected] by October 18, 2024. Responses from Modesto will be communicated in writing to all recipients of this RFP by October 28, 2024. Modesto reserves the right to reject any Proposal that contains unauthorized conditions or exceptions.

5. PROPOSAL DUE DATE AND SUBMITTAL
Proposals must be received by City prior to 4:00 p.m. on Friday, November 15, 2024.

Proposals received after the above specified date and time will be returned unopened. Cost proposals shall be delivered in a separately sealed envelope, clearly marked “Cost Proposal”.

Proposals delivered in person or by mail shall be submitted to the following:

City of Modesto
City Clerk’s Office
1010 Tenth Street, 6th Floor
P.O. Box 642
Modesto, California 95353
Attention: Ben Koehler, Chief Plant Operator
#1..
- 65 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 8 ends

Identification of Proposals
Firm shall submit three (1) electronic copy and five (5) copies of its proposal addressed as shown above, bearing the firm's name, address, and clearly marked as follows:
“Proposal for City of Modesto, Standard Operating Procedure Development”

SELECTION PROCESS
Proposals will be evaluated by the Selection Committee and may be invited to an interview by the Committee. The Committee will rank the firms based upon an evaluation of the Proposals and interviews. Negotiations will begin with the firm deemed most qualified. If agreement cannot be reached in negotiations, Modesto will begin negotiations with the firm that is judged to be next most qualified.

Proposals and interviews will be evaluated on the following grading criteria:

PROPOSED SCOPE OF SERVICES (45 POINTS)
The two key criteria in determining the point ranking in this category are ‘Project Understanding’ and ‘Project Approach’. Project Understanding will be measured by the consultant’s demonstrated understanding of the project’s scope of services and the recognition of potential issues warranting special effort and/or concern. The consultant’s Project Approach will be evaluated by the completeness of the proposed work plan in addressing the scope of services, including full coverage of the project’s data needs and technical evaluations.

PROJECT TEAM AND EXPERIENCE (35 POINTS)
The consultant’s proposed project team (including sub-consultants) will be evaluated by the various team members’ organizational ability, time management skills, areas of specialization, ability to produce quality work products, availability, and demonstrated experience in California wastewater regulatory regulations and compliance requirements plant operations over the last five (5) years.

GENERAL (15 POINTS)
 Size of firm and available staff appropriate to project size.  Location of firm in relation to City of Modesto and project size.  Firm reputation as it relates to principles, credibility, and attitude.

LOCAL SUB-CONSULTANT INVOLVEMENT (5 POINTS):

If appropriate for the scope of services, consultants will be evaluated on the inclusion of local subconsultants on the team and the anticipated percentage of work to be performed by local subconsultants. Local sub-consultants are defined as having a business office in Stanislaus County. #1..
- 66 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 9 ends

INTERVIEW AND PRESENTATION, IF NEEDED (ADDITIONAL 10 POINTS):

The consultant’s presentation of its approach to wastewater standard operating procedure development will be evaluated for content, originality, creativity, and soundness of approach to creating the best system for creating, updating, and using SOPs. The consultants will also be evaluated on their responses to project-related questions asked by the review committee.

After reviewing the proposals, if there is not a clear top choice, Modesto will schedule interviews.

The top two to three most qualified ranked firms will be invited to interview with the Selection Committee. Each time slot for the oral interviews will be determined randomly. Firms shall make every effort to attend and rescheduling will only take place in extenuating circumstances. If representatives of Modesto experience difficulty on the part of any team in scheduling a time for the interview, it may result in disqualification from further consideration.  Length of Interview: 1 hour maximum
 Format:
o Up to 25-minute firm/team Introduction and Presentation o Up to 35-minute Selection Committee Question and Answer

AGREEMENT
Following interviews, negotiations will begin with the firm deemed most qualified. If an agreement cannot be reached in negotiations, Modesto will begin negotiations with the firm that is judged to be next most qualified. If Modesto determines to approve the agreement, a City of Modesto Standard Agreement shall be sent to the successful firm for signature. If an agreement is reached, the Standard Agreement will be presented to Council for approval. Once Modesto’s City Council has approved the Standard Agreement, the agreement will be executed by Modesto. No proposal shall be binding upon Modesto until after duly authorized representatives of both the firm and Modesto have signed the Standard Agreement. Modesto shall have the sole authority to terminate negotiations with any firm at any time without recourse by the firm. The approval of the agreement, if made by Modesto, will be based on a total review and analysis of each proposal and interview.

A sample City of Modesto Standard Agreement for Consultant Services is included for your reference (Attachment 1). Please review the sample agreement carefully with your legal and/or insurance representative.

Firms are REQUIRED to submit any questions, concerns, or language change requests regarding this agreement in writing included in the Proposal. Note: Firms choosing not to provide any comments in writing included in the Proposal are assumed to agree with the agreement in its entirety, as written, no exceptions.

Conflict of Interest/City Business License
Modesto requires that firm’s Principal file a Statement of Economic Interest Form 700 with Modesto to the satisfaction of the Fair Political Practices Commission (FPPC) when the firm #1..
- 67 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 10 ends

provides information, advice, recommendations, or counsel to Modesto. Before Modesto enters into an agreement for services with the selected firm, the Principal will be required to report individual economic interests within the City of Modesto on the following:

1. Real Property Interest (geographically limited)

2. Sources of Income

3. Business Positions

4. Business Investments
The selected firm is also required to submit a completed and signed Financial Interest Disclosure Form and maintain a City of Modesto business license.

RIGHTS OF THE CITY OF MODESTO
Modesto will evaluate all proposals submitted, but this RFP does not commit Modesto to approve an agreement, to pay for any costs incurred in preparation or presentation of a Proposal, or to procure an agreement for services. Modesto reserves the right to:
 Make the selection based on its sole discretion;
 Accept or reject any and all Proposals, or any item or part thereof, or to waive any informalities or irregularities;
 Withdraw this RFP at any time without prior notice, and the City makes no representations that any agreement will be approved with any firm responding to this RFP;
 Issue subsequent RFP;
 Postpone Proposal opening for its own convenience;
 Approve or disapprove the use of particular subconsultant;  Negotiate with any, all, or none of the firms submitting a Proposal;  Enter into an agreement with another firm in the event the originally selected Proposer defaults or fails to execute an agreement with Modesto.

PROJECT SCHEDULE
Requests for Clarifications, Corrections or Modifications Due October 18, 2024 Proposals Due November 15, 2024
Bid Opening 11:00 am via MS Teams November 19, 2024
Committee Review December 11, 2024
Consultant Interviews, if needed TBD
*Council Approval TBD
*Notice to Proceed March 2024
*Dates subject to change
#1..
- 68 -
SUBJECT: Proposals (RFP) 2324-99, Standard Operating Procedures Development

Page 11 ends

If you have any questions regarding this RFP, please feel free to contact me, email is the best manner to reach me. Thank you in advance for your interest in our project.

Sincerely,
Ben Koehler
Chief Plant Operator
Utilities Department
[email protected]
Office: 209-342-4502

ATTACHMENTS
The attachments below are included for your review and submittal:
 Attachment 1 – Modesto Consultant Agreement Sample
 Exhibit A – SOP Priority List
 Exhibit B – Sutter Area Management Plans (incomplete)  Exhibit C – Jennings Interior Area Management Plan
 Exhibit D – Jennings Phase 1 Area Management Plan
 Exhibit E – Jennings Phase 2 Area Management Plan
#1..
- 69 -
ATTACHMENT 1

STANDARD AGREEMENT

FOR CONSULTANT SERVICES
THIS AGREEMENT, made and entered into in the City of Modesto, State of California, this day of , 2025, (“Effective Date”) by and between the CITY OF MODESTO, a municipal corporation of the State of California, hereinafter referred to as "City", and (CONSULTANT), a California corporation, hereinafter referred to as "Consultant".

This Agreement is made with regard to the following recitals:

A. City has determined that a Standard Operating Procedures should be prepared for the City.

B. Consultant represents that it is qualified, willing, and able to provide the services to prepare said document(s).

NOW, THEREFORE, in consideration of this agreement, and the mutual promises, covenants, and stipulations hereinafter contained, the parties agree as follows:

1. SCOPE OF SERVICES.

Consultant shall undertake and complete the preparation of the scope of work as set forth and described in the documents attached hereto and referred to as Exhibit "A" or "Project". The Consultant shall perform the services as described in Exhibit "A" in a manner compatible with the standards of its profession and shall produce a fully complete project that is acceptable to City.

2. TERM OF AGREEMENT.

This Agreement is effective as of the date first written above and will continue in effect until City's acceptance of and payment for all services authorized by City and performed by Consultant, unless terminated earlier in accordance with the provisions of the #1..
- 70 -
ATTACHMENT 1
termination clause in this Agreement.

Consultant shall undertake and complete the preparation of the scope of work as set forth and described in the documents commonly referred to as “Project” attached hereto as Exhibit "A" and made a part hereof. City hereby gives Consultant notice to proceed with the preparation of the Project in the manner described in Exhibit "A", as of the Effective Date of this agreement. Consultant shall diligently proceed with the preparation of the project and agrees to complete said preparation within the time period set forth in Exhibit "A".

3. COMPENSATION.

Consultant agrees to accept a sum not to exceed $________ (maximum compensation) as full remuneration for performing all services and furnishing all staffing and materials called for Modesto in accordance with Exhibit "A”, attached hereto and for performance by Consultant of all of its duties and obligations under this Agreement, except that additional services may be compensated as described below.

The Compensation shall be paid pursuant in the manner and at the times set forth below:

City shall pay Consultant on a time and materials basis for Consultant’s actual costs for all work called for in Exhibit “A” to this Agreement. All work to be performed under this Agreement shall be billed at the hourly rates set forth in Exhibit “B” attached hereto, Consultant shall submit monthly invoices to City which include detailed tasks, hours worked, and billable rates for all work completed, and detailed receipts for any out-of-pocket costs paid by Consultant in connection with work performed on this project.

Additional services may be authorized by the City Manager in an amount up to, but not to exceed 10% of the agreed maximum compensation, or $_________. In the event that additional services are deemed necessary; the Consultant shall provide a written #1..
- 71 -
ATTACHMENT 1
request to the City Manager indicating the reason for additional work, scope and cost of such work. The City Manager shall provide a written response to the request, either approving or denying the additional expenditure. If additional services are requested and approved, they will be billed at the hourly rates set forth in Exhibit “B” and may not exceed the amount requested and approved in writing by the City Manager. In that event, the new total compensation shall not exceed $_________. If additional services in excess of this amount are deemed necessary by City Staff, an amendment to this Agreement will be required and must be approved by the City Council prior to commencing the work, as provided in Paragraph 9 of this agreement.

City shall pay Consultant [TO BE DETERMINED BY RFP RESPONSE IN FINAL AGREEMENT, EITHER “Net 30 terms via CITY’s ePay Program” or “Net 45 Days via manual check”.]

4. OBLIGATIONS OF CONSULTANT.

Throughout the term of this Agreement, Consultant shall possess, or secure all licenses, permits, qualifications and approvals legally required to conduct business. Consultant warrants that it has all of the necessary professional capabilities and experience, as well as all tools, instrumentalities, facilities and other resources necessary to provide the City with the services contemplated by this Agreement. Consultant further warrants that it will follow the best current, generally accepted, and professional practices to make findings, render opinions, prepare factual presentations, and provide professional advice and recommendations regarding this project.

5. PERFORMANCE BY KEY EMPLOYEE.

Consultant has represented to City that ________________________ will be the person primarily responsible for the performance of the services referred to in this Agreement. City has entered into this Agreement in reliance on that representation by Consultant. #1..
- 72 -
ATTACHMENT 1
Consultant therefore agrees that percent ( %) or more of the time to be devoted to the project that is the subject of this Agreement will be that of the above-named person.

6. OWNERSHIP OF DOCUMENTS/TITLE TO DATA.

Ownership of Documents
All reports, drawings, designs, graphics, working papers and other incidental work or materials furnished hereunder shall become and remain the property of the City, and may be used by City as it may require without any additional cost to City. No reports shall be used by the Consultant for purposes other than this contract without the express prior written consent of City.

Title to Data
If, as a part of the agreement, Consultant is required to produce data such as, but not limited to, drawings, plans, specifications, calculations, models, flow diagrams, visual aids and other related materials, the originals of all such data generated under this agreement will be delivered to City upon the completion or termination of services under the contract. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to the Agreement are prepared specifically for the City and are not necessarily suitable for any future or other use.

All materials, documents, data or information obtained from the City data files or any City medium furnished to Consultant in the performance of this Agreement will at all times remain the property of the City. Such data or information may not be used or copied for direct or indirect use by Consultant after termination of this Agreement without written consent of the City.
#1..
- 73 -
ATTACHMENT 1

7. NEWS AND INFORMATION RELEASE.

Consultant agrees that it will not issue any news releases in connection with either the award of this Agreement, or any subsequent amendment of or efforts under this Agreement, without first obtaining review and approval of said news releases from the City through the City Manager.

8. CONFLICT OF INTEREST.

Consultant warrants that it presently has no interest and shall not acquire any interest, direct or indirect, which would create a “conflict of interest”, as that term is defined in the Political Reform Act (Gov. Code § 81000 et seq), for the Consultant in the performance of this Agreement. Consultant warrants that, in performance of this Agreement, Consultant shall not employ any person having any such interest. Consultant understands that, if this Agreement is made in violation of Government Code § 1090 et seq., the entire Agreement is void and Consultant will not be entitled to any compensation for services performed. Consultant agrees to file a Statement of Economic Interests with the City Clerk at the start and end of this contract if so, required at the option of City.

9. AMENDMENTS.

Both parties to this Agreement understand that it may become desirable or necessary during the execution of this Agreement, for City or Consultant to modify the scope of services provided for under this Agreement. This Agreement, including the Exhibits attached hereto, may be amended only by an Amendment signed by both Parties. City will not be responsible to pay any charges Consultant may incur in performing services not identified in Exhibit ‘A’ unless first authorized by the City in writing, and Consultant shall not be required to perform any such additional services.
#1..
- 74 -
ATTACHMENT 1

10. INDEPENDENT CONTRACTOR.

All acts of Consultant, its agents, officers, and employees and all others acting on behalf of Consultant relating to the performance of this Agreement, shall be performed as independent contractors and not as agents, officers, or employees of City. Consultant, by virtue of this Agreement, has no authority to bind or incur any obligation on behalf of City. Consultant has no authority or responsibility to exercise any rights or power vested in the City. It is understood by both Consultant and City that this Agreement shall not under any circumstances be construed or considered to create an employer-employee relationship or a joint venture.

Consultant, its agents, officers and employees are and, at all times during the terms of this Agreement, shall represent and conduct themselves as independent contractors and not as employees of City.

Consultant shall determine and control the method, details and means of performing the work and services to be provided by Consultant under this Agreement. Consultant shall be responsible to City only for the requirements and results specified in this Agreement, and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of the Consultant in fulfillment of this Agreement. Consultant is permitted to provide services to others during the same period service is provided to City under this Agreement. If necessary, Consultant has the responsibility for employing other persons or firms to assist Consultant in fulfilling the terms and obligations under this Agreement.

If in the performance of this Agreement any third persons are employed by Consultant, such persons shall be entirely and exclusively under the direction, supervision, and control of Consultant. All terms of employment including hours, wages, working conditions, discipline, hiring, and discharging or any other term of employment or requirement of law shall be determined by the Consultant.
#1..
- 75 -
ATTACHMENT 1
It is understood and agreed that as an independent contractor and not an employee of City neither the Consultant or Consultant's assigned personnel shall have any entitlement as a City employee, right to act on behalf of the City in any capacity whatsoever as an agent, or to bind the City to any obligation whatsoever.

It is further understood and agreed that Consultant must issue W-2 forms or other forms as required by law for income and employment tax purposes for all of Consultant's personnel.

As an independent contractor, Consultant hereby indemnifies and holds City harmless from any and all claims that may be made against City based upon any contention by any third party that an employer-employee relationship exists by reason of this Agreement.

11. ASSIGNMENT.

Neither this Agreement nor any portion thereof shall be subcontracted or assigned, other than noted in Exhibit ‘A’, without the express prior written consent of the City in each and every instance.

12. PATENT/COPYRIGHT MATERIALS.

Unless otherwise expressly provided in the contract, Consultant shall be solely responsible for obtaining the right to use any patented or copyrighted materials in the performance of this Agreement. Consultant shall furnish a warranty of such right to use to City at the request of City.

13. NOTICES.

Notice required by this Agreement shall be given in writing and shall be deemed given and effective upon delivery provided that such are delivered in accordance with the provisions of this Section. Notices shall be delivered either by: (a) personal delivery; (b) overnight courier service which obtains confirmation of delivery; or (c) certified pail, return receipt #1..
- 76 -
ATTACHMENT 1
requested, if delivery is confirmed by a return receipt; or (d) by electronic transmission subject to reasonable proof that the notice was both transmitted and received. Each such notice shall be sent to the parties at the address respectively set forth below or to such other address as a party may designate by written notice given in accordance with the provisions of this Section:

FOR CONSULTANT: Name:

Address:

Attention:

Phone: ( )
Email:

FOR CITY: Name: City of Modesto
Address: P.O. Box 642
Modesto, CA 95353
Attention: Ben Koehler
Phone: (209) 342-4502
Facsimile: (209) 525-9311

14. INSURANCE REQUIREMENTS.

The Consultant shall provide at its own expense and maintain at all times the following insurance with insurance companies licensed in the State of California and shall provide evidence of such insurance to the City as may be required by the Risk Manager of the City. The policies or certificates thereof shall provide that, thirty (30) days prior to cancellation or material change in the policy, notices of same shall be given to the Risk Manager of the City via PINS Advantage Insurance Program, for all of the following stated insurance policies.

In the event the certificates of insurance required hereunder do not provide for notice of cancellation to the certificate holder and/or additional insureds, the Consultant shall provide, and shall require its subcontractors to provide, as an express condition precedent to payment hereunder, an endorsement from their insurers providing that the additional insureds identified herein shall be provided 30 days’ notice of the cancellation on the policies of insurance required hereunder (10 days’ notice if the policies are cancelled for non-payment of premium). In #1..
- 77 -
ATTACHMENT 1
addition, the named insured on all such policies shall provide to the additional insureds identified herein any notices of cancellation of said insurance policies within 5 business days of receipt of such notice. The Consultant shall, as a further express condition precedent to payment for work performed, affirm under penalty of perjury that the required insurance on the project remains in place and said insurance has not been cancelled.
(a) Worker's Compensation - in compliance with the statutes of the State of California, plus employer's liability with a minimum limit of liability of $1,000,000. (b) General Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. This insurance shall indicate on the certificate of insurance the following coverages and indicate the policy aggregate limit applying to: premises and operations; broad form contractual; independent consultants and subcontractors; products and completed operations as applicable.
(c) Automobile Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. This insurance shall cover any automobile for bodily injury and property damage.
(d) Professional Liability insurance with a minimum limit of $1,000,000 per claim and policy aggregate. If coverage is on a claim made basis it shall be maintained for at least three (3) years following completion of the work.

If at any time any of said policies shall be unsatisfactory to the City, as to form or substance, or if a company issuing such policy shall be unsatisfactory to the City, the Consultant shall promptly obtain a new policy, submit the same to the Risk Manager for approval #1..
- 78 -
ATTACHMENT 1
and submit a certificate thereof as hereinabove provided. Upon failure of the Consultant to furnish, deliver or maintain such insurance and certificates as above provided, this Agreement, at the election of the City, may be forthwith declared suspended or terminated. Failure of the Consultant to obtain and/or maintain any required insurance shall not relieve the Consultant from any liability under this Agreement, nor shall the insurance requirements be construed to conflict with or otherwise limit the obligations of the Consultant concerning indemnification. The City, its agents, officers, employees, and volunteers shall be named as an additional insured on all insurance policies required herein, except Workers' Compensation and Professional Liability. The Workers' Compensation insurer shall agree to waive all rights of subrogation against the City, its agents, officers, employees, and volunteers for losses arising from work performed by Consultant for the City. The Consultant's insurance policy(ies) shall include a provision that the coverage is primary as respects the City; shall include no special limitations to coverage provided to additional insured; and, shall be placed with insurer(s) with acceptable Best's rating of A: VII or with approval of the Risk Manager. The Consultant must deliver certificates evidencing existence of the insurance listed above to the City prior to the time the contract is signed.

CONSULTANT shall provide CITY with separate endorsements evidencing proof of the CITY’s additional insured status as to both the general liability and automobile liability insurance policies. In addition, CONSULTANT shall provide CITY with a Workers Compensation subrogation waiver by way of a separate endorsement. All endorsements referenced above must include the applicable policy number.

For any claims related to this project, the CONSULTANT’S insurance coverage shall be primary insurance as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, #1..
- 79 -
ATTACHMENT 1
employees, or volunteers shall be excess of the CONSULTANT’S insurance and shall not contribute with it.

15. TERMINATION OF AGREEMENT.

Termination for Default of Consultant
Should Consultant default in the performance of this Agreement or materially breach any of its provisions, at its option, City may terminate this Agreement by giving written notification to Consultant. The termination date shall be the effective date of the notice. For the purposes of this section, material breach of this Agreement shall include, but not be limited to, any of the following: failure to perform required services or duties, willful destruction of City's property by Consultant, dishonesty or theft.

Termination by City for Convenience
The City may cancel this Agreement at any time, with or without cause, upon written notification to Consultant.

Post-Termination Procedure
Upon receipt of a written notice of termination, the Consultant shall:
a. Cease its work as directed in the notice of termination as of the termination date and see to it that its employees, subconsultants and agents are notified of such termination and act as specified in the notice of termination;
b. Terminate all orders and Subcontractors except as necessary to complete any portion of the Work that is not terminated; c. If directed in writing by the City to do so, assign all right, title and interest in subcontracts and materials in progress to City, in which case the City will have the right at its discretion to settle, #1..
- 80 -
ATTACHMENT 1
or pay any or all claims arising out of the termination of such subconsultants, but in no event shall recovery by any Consultant or subconsultant include lost profits for portions of the Work not completed or undertaken, including materials not delivered; d. Deliver or otherwise make available to the City all data, drawings, specifications, reports, estimates, summaries and such other information and material as may have been accumulated by the Consultant in performing the Work whether completed or in process; e. Settle outstanding liabilities and claims, subject to the approval of City;
f. Complete performance of such part of the Project as has not been terminated;
g. Take such other actions as may be necessary, or as may be directed by the City for the protection and preservation of the Project and/or property related to the Project;
h. If City so requests, and at City's cost, Consultant shall provide sufficient oral or written status reports to make City reasonably aware of the status of Consultant's work on the project. i. The Consultant understands and agrees that City may, in City's sole discretion, refuse to pay Consultant for that portion of Consultant's services which were performed by Consultant on the project prior to the termination date and which remain
unacceptable and/or not useful to City as of the termination date. #1..
- 81 -
ATTACHMENT 1
City will pay Consultant for work actually completed prior to the receipt of the termination notice or otherwise completed in accordance with the notice of termination.

The final payment to the Consultant after termination for convenience shall be limited to amounts due and owing under the Agreement at time of termination, including the following:
a. The cost of settling and paying valid claims arising out of the termination of the Work such as subconsultant agreements or contracts for materials;
b. The Agreement price allocable to the portion of the Work properly performed or goods supplied to the work site by the Consultant as of the date of termination, as determined in accordance with the notice of termination, reduced by any sums previously paid to the Consultant.

16. INDEMNITY.

The Consultant shall hold the City, its agents, officers, employees, and volunteers, harmless from and save, defend and indemnify them against any and all claims, losses, liabilities, judgments or damages from every cause, including but not limited to injury to person or property or wrongful death, including reasonable costs and expenses of defense of any judicial or administrative action, arising directly or indirectly out of any negligent or intentional act or omission of Consultant, or its agents, officers, employees, or volunteers relating to or during the performance of its obligations under this Agreement.

Consultant's obligation to defend, indemnify, and hold the City, its agents, officers, and employees harmless under the provisions of this paragraph is not limited to or restricted by any requirement in this Agreement for Consultant to procure and maintain a policy of insurance.
#1..
- 82 -
ATTACHMENT 1
In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

17. DISPUTE RESOLUTION.

Venue for all claims, controversies, or disputes arising out of, or relating to the formation of this Agreement, or the breach, termination execution, enforcement, interpretation, or validity of this Agreement, including the determination of the scope or applicability of this contract provision shall be in the Superior Court of Stanislaus County or the United States District Court for the Eastern District of California.

18. ATTORNEYS’ FEES.

If a party to this AGREEMENT brings any action, including an action for declaratory relief, to enforce or interpret the provision of this AGREEMENT, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

19. ENTIRE AGREEMENT.

This Agreement and its exhibits contain the entire understanding between Consultant and City. All previous proposals, offers and communications relative to this Agreement, whether oral or written, are hereby superseded except to the extent that they have been incorporated into this Agreement.
#1..
- 83 -
ATTACHMENT 1

20. PARTIAL INVALIDITY.

If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force without being impaired or invalidated in any way.

21. WAIVER.

The waiver by any party to this Agreement of a breach of any provision hereof shall be in writing and shall not operate or be construed as a waiver of any other or subsequent breach hereof unless specifically stated in writing.

22. AUDIT.

The City's duly authorized representative shall have access at all reasonable times to all reports, contract records, contract documents, contract files, and personnel necessary to audit and verify Consultant's charges to City under this Agreement.

Consultant agrees to retain reports, records, documents, and files related to charges under this Agreement for a period of four (4) years following the date of final payment for Consultant services. City's representative shall have the right to reproduce any of the aforesaid documents.

23. GOVERNING LAW.

This Agreement shall be governed according to the laws of the State of California.

24. HEADINGS NOT CONTROLLING.

Headings used in the Agreement are for reference purposes only and shall not be considered in construing this Agreement.
#1..
- 84 -
ATTACHMENT 1

25. COMPLIANCE WITH LAWS.

Consultant shall insure compliance with all safety and hourly requirements for employees, in accordance with federal, state, and county safety and health regulations and laws.

Consultant shall fully comply with all applicable federal, state, and local laws, ordinances, regulations and permits.

26. CITY BUSINESS LICENSE.

Consultant will have a City of Modesto business license.

IN WITNESS WHEREOF, the City of Modesto, a municipal corporation, has authorized the execution of this Agreement by its City Manager and attestation by its City Clerk under authority of Resolution No. 2025- , adopted by the Council of the City of Modesto on the day of , 2025, and CONSULTANT has caused this agreement to be duly executed as of the Effective Date.

CITY OF MODESTO, CONSULTANT,
a municipal corporation a California Corporation*
By ___________________________ By _________________________________ JOSEPH P. LOPEZ, City Manager Name Title
By ________________________________
Name Title

ATTEST: (Seal)
By _____________________________________
DIANE NAYARES-PEREZ, CMC, City Clerk
Consultant’s Federal ID #_______________
APPROVED AS TO FORM:

By ________________________________
JOSE M. SANCHEZ, City Attorney
APPROVED AS TO FORM:

By ____________________________________
MATTHEW BRALEY, ARM-PE, Risk Manager
#1..
- 85 -
Facility Identifier
Sutter and Jennings ALL
Sutter SUT
Jennings JEN
Area Identifier
Administration ADMIN
Compliance COMP
Control System CONT
Flow Diversions FLOW
Headworks HEAD
Primary Clarification PRI
Anaerobic Digestion DIG
Can Seg Pumping CAN
Primary Effluent Pumping PEP
Fixed Film Reactors FFR
Fine Screening SCR
Oxidation Ditch OX
Aerated Activated Sludge BNR
Membrane Biofiltration MBR TP1 or TP2
Chemical Handling CHEM TP1 or TP2 or SUT
Disinfection UV TP1 or TP2
Tertiary TERT
Ponds POND
Irrigation IRR
Ranch RAN
Effluent Pump Station EPS
Solids Handling SOL
Utilities UTL
Priority Facility Area No. Title
1 ALL ADMIN Standard Operating Procedure (SOP) Development 1 ALL ADMIN Chemical Inventory Control and Ordering
ALL ADMIN Major Equipment Start and Stop Guidelines
ALL ADMIN Monthly Data Review
ALL ADMIN Log Sheet Review and Handling
ALL ADMIN Health and Safety Alarms
1 ALL ADMIN How to Write a Work Order
ALL COMP Potential Permit Nonconformance Actions
1 ALL COMP Chain-of-Custody Protocol
ALL COMP Auto-Sampler Failure Response
ALL COMP Small Spill Reporting and Remediation
ALL COMP Daily Process Analyses - Overall
Exhibit A - SOP Priority List
#1..
- 86 -
1 ALL COMP Plant Samples
1 ALL CONT Shift Procedures
1 ALL CONT High Priority Alarms Response
ALL CONT Control System Maintenance
ALL CONT Daily Alarm Review
ALL CONT Alarm Package Maintenance
1 SUT SP Shift Procedures
1 JEN TP1 Shift Procedures
1 JEN TP2 Shift Procedures
1 JEN R&I Shift Procedures
1 SUT HEAD High Plant Influent Flow Event Response
SUT HEAD Lift Pump In or Out of Service
SUT HEAD Barscreen In or Out of Service
SUT HEAD Grit System In or Out of Service
1 SUT HEAD Septic Receiving
SUT HEAD Odor Control In or Out of Service
SUT HEAD System Reset and Check
1 SUT PRI Primary Clarifier In or Out of Service
1 SUT PRI Primary Sludge Pump In or Out of Service and Control SUT PRI Primary Clarifier Blanket and Control
SUT PRI Primary Scum Pump In or Out of Service
SUT PRI Odor Control In or Out of Service
SUT PRI System Reset and Check
1 SUT DIG Digester In or Out of Service
SUT DIG Hot Water System In or Out of Service and Control SUT DIG Recirculation Pump In or Out of Service and Control SUT DIG Mixers In or Out of Service and Control
SUT DIG Digester Flare Operation
1 SUT DIG Digester Gas Handling Equipment Check
SUT DIG Boiler In/Out of Service/Control
1 SUT DIG Drying Bed Selection and Filling
1 SUT DIG Biosolids Testing and Application
SUT CHEM Ferric Chloride In or Out of Service and Control SUT CHEM System Reset and Check
1 ALL CAN Barscreen In or Out of Service
ALL CAN Pumping Plant #3 Pumps In or Out of Service
ALL CAN Pumping Plant #2 Pumps In or Out of Service
1 ALL FLOW Placing Can Seg in Service
1 ALL FLOW Taking Can Seg Out of Service
ALL FLOW System Reset and Check
#1..
- 87 -
1 JEN PEP TP1 Primary Effluent Pump In or Out of Service and Control JEN PEP TP1 Drain System In or Out of Service
JEN PEP TP1 System Reset and Check
1 JEN PEP TP2 Primary Effluent Pump In or Out of Service and Control JEN PEP TP2 Drain System In or Out of Service
JEN PEP TP2 System Reset and Check
1 JEN FFR Fixed Film Reactor In or Out of Service
1 JEN FFR Fixed Film Reactor Feed Pump In and Out of Service JEN FFR Fixed Film Reactor Cleaning
JEN FFR System Reset and Check
1 JEN SCR TP1 Fine Screen In or Out of Service
1 JEN SCR TP1 Screenings Washer/Compactor In or Out of Service JEN SCR TP1 Screenings Handling (Removal)
1 JEN SCR TP1 Influent Sampler Inspection
JEN SCR TP1 System Reset and Check
1 JEN SCR TP2 Fine Screen In or Out of Service
1 JEN SCR TP2 Screenings Washer/Compactor In or Out of Service JEN SCR TP2 Screenings Handling (Removal)
1 JEN SCR TP2 Influent Sampler Inspection
JEN SCR TP2 Foul Air Fans In or Out of Service
JEN SCR TP2 System Reset and Check
1 JEN OX Aerator In or Out of Service
JEN OX Drain System Operation
1 JEN OX Mixed Liquor Pump In or Out of Service and Control 1 JEN OX Mixed Liquor Wetwell Level Indicator In or Out of Service 1 JEN OX WAS Pump In or Out of Service and Control
1 JEN OX DO Analyzer Verification and Calibration
JEN OX Recognizing and Response to Analyzer Failure
JEN OX Anoxic Mixer In or Out of Service
JEN OX Foam Pump In or Out of Service and Control
JEN OX System Reset and Check
1 JEN BNR Aeration Basin In or Out of Service and Control 1 JEN BNR Anoxic Zone Mixer In or Out of Service
1 JEN BNR DO Analyzer Verification and Calibration
JEN BNR Recognizing and Response to Analyzer Failure
JEN BNR Aeration Basin Drain System Operation
JEN BNR Aeration Diffuser Inspection and Cleaning
1 JEN BNR Aeration Blower In or Out of Service and Control 1 JEN BNR RAS Pump In or Out of Service and Control
#1..
- 88 -
1 JEN BNR RAS Wetwell Level Indicator In or Out of Service 1 JEN BNR WAS Pump In or Out of Service and Control
JEN BNR System Reset and Check
1 JEN MBR TP1 MBR Tank In or Out of Service and Control 1 JEN MBR TP1 Air Scour Blower In or Out of Service and Control 1 JEN MBR TP1 Permeate Tank In or Out of Service and Control 1 JEN MBR TP1 Permeate Pump In or Out of Service and Control 1 JEN MBR TP1 Maintenance Clean-in-Place Operation and Control JEN MBR TP1 System Reset and Check
1 JEN MBR TP2 MBR Tank In or Out of Service and Control 1 JEN MBR TP2 RAS Channel Mixer In or Out of Service
1 JEN MBR TP2 Air Scour Blower In or Out of Service and Control 1 JEN MBR TP2 Permeate Tank In or Out of Service and Control 1 JEN MBR TP2 Permeate Pump In or Out of Service and Control 1 JEN MBR TP2 Maintenance Clean-in-Place Operation and Control 1 JEN MBR TP2 Step Screen In or Out of Service and Control JEN MBR TP2 Scum Box Cleaning
JEN MBR TP2 System Reset and Check
1 JEN CHEM TP1 Chemical Storage Inspection
1 JEN CHEM TP1 Chemical Receiving
JEN CHEM TP1 Chemical Spill Response
JEN CHEM TP1 Chemical Containment Cleanup
JEN CHEM TP1 Citric Acid Pump In or Out of Service
JEN CHEM TP1 Citric Acid Pump Control
JEN CHEM TP1 Citric Acid Storage Tank In or Out of Service JEN CHEM TP1 Citric Acid Storage Tank Cleaning
JEN CHEM TP1 Sodium Hypochlorite Pump In or Out of Service JEN CHEM TP1 Sodium Hypochlorite Pump Control
JEN CHEM TP1 Sodium Hypochlorite Storage Tank In or Out of Service JEN CHEM TP1 Sodium Hypochlorite Storage Tank Cleaning
JEN CHEM TP1 Phosphoric Acid Pump In or Out of Service
JEN CHEM TP1 Phosphoric Acid Pump Control
JEN CHEM TP1 Phosphoric Acid Storage Tank In or Out of Service JEN CHEM TP1 Phosphoric Acid Storage Tank Cleaning
JEN CHEM TP1 System Reset and Check
1 JEN CHEM TP2 Chemical Storage Inspection
1 JEN CHEM TP2 Chemical Receiving
JEN CHEM TP2 Chemical Spill Response
JEN CHEM TP2 Chemical Containment Cleanup
JEN CHEM TP2 Citric Acid Pump In or Out of Service
JEN CHEM TP2 Citric Acid Pump Control
JEN CHEM TP2 Citric Acid Storage Tank In or Out of Service #1..
- 89 -
JEN CHEM TP2 Citric Acid Storage Tank Cleaning
JEN CHEM TP2 Sodium Hypochlorite Pump In or Out of Service JEN CHEM TP2 Sodium Hypochlorite Pump Control
JEN CHEM TP2 Sodium Hypochlorite Storage Tank In or Out of Service JEN CHEM TP2 Sodium Hypochlorite Storage Tank Cleaning
JEN CHEM TP2 Sulfuric Acid Pump In or Out of Service
JEN CHEM TP2 Sulfuric Acid Pump Control
JEN CHEM TP2 Sulfuric Acid Storage Tank In or Out of Service JEN CHEM TP2 Sulfuric Acid Storage Tank Cleaning
JEN CHEM TP2 Sodium Hydroxide Pump In or Out of Service JEN CHEM TP2 Sodium Hydroxide Pump Control
JEN CHEM TP2 Sodium Hydroxide Delivery Tote In or Out of Service JEN CHEM TP2 System Reset and Check
1 JEN UV TP1 UV Vessel In or Out of Service
1 JEN UV TP1 UV System In or Out of Service and Control 1 JEN UV TP1 UV Lamp Module In or Out of Service
1 JEN UV TP1 UV Module Cleaning Procedures
1 JEN UV TP1 Effluent Sampler Inspection
1 JEN UV TP1 Turbidimeter In or Out of Service and Maintenance 1 JEN UV TP1 UV Transmittance Meter In or Out of Service and Maintenance
JEN UV TP1 Tannin and Lignin Response Plan
JEN UV TP1 System Reset and Check
1 JEN UV TP2 UV Vessel In or Out of Service
1 JEN UV TP2 UV System In or Out of Service and Control 1 JEN UV TP2 UV Lamp Module In or Out of Service
1 JEN UV TP2 UV Module Cleaning Procedures
1 JEN UV TP2 Effluent Sampler Inspection
1 JEN UV TP2 Turbidimeter In or Out of Service and Maintenance 1 JEN UV TP2 UV Transmittance Meter In or Out of Service and Maintenance
JEN UV TP2 System Reset and Check
1 JEN TERT Tertiary Effluent Pump In or Out of Service and Control 1 JEN TERT Utility Water Pump In or Out of Service and Control 1 JEN TERT Combined Effluent Composite Sampler In or Out of Service JEN TERT HVAC Heat Exchanger???
JEN TERT System Reset and Check
1 JEN POND Shift Procedures
JEN POND Facultative Pond Inlet Pump In and Out of Service and Control JEN POND Storage Pond Pumps In and Out of Service and Control JEN POND Irrigation Forebay Pumps In and Out of Service and Control JEN POND Storage Pond #2 Butterfly Valve Failure Response #1..
- 90 -
JEN POND System Reset and Check
JEN EPS Pump In and Out of Service and Control
JEN EPS Surge Tank In and Out of Service and Control
JEN EPS Drain to Irrigation Forebay
JEN EPS System Reset and Check
1 JEN IRR Coordination with End Users
JEN IRR Tailwater Pump In and Out of Service
JEN IRR Booster Pump In and Out of Service
1 JEN IRR Soil Sampling
1 SUT UTL Critical Equipment - Prioritized
1 SUT UTL Power Outage - Recovery Sequence
SUT UTL Natural Gas - Isolation and Restart
SUT UTL Potable Water - Isolation and Restart
SUT UTL Potable Water - Line Break Disinfection
SUT UTL Non-Potable Water - Isolation and Restart
SUT UTL Plant Drain System
1 JEN UTL Critical Equipment - Prioritized
1 JEN UTL Power Outage - Recovery Sequence
JEN UTL Natural Gas - Isolation and Restart
JEN UTL Potable Water - Isolation and Restart
JEN UTL Potable Water - Line Break Disinfection
JEN UTL Non-Potable Water - Isolation and Restart
JEN UTL Plant Drain System In or Out of Service and Control JEN UTL Utility Water Hypo Pump In or Out of Service and Control #1..
- 91 -
Version Date revised Version Approved
Version 1 March 2021
1 Exhibit B
Sutter
Area Management Plan
#1..
- 92 -
Table of Contents
Sutter processes include
• Coarse screening
• Grit removal • Influent pumping
• Primary clarification
• Anaerobic digestion
• Solids drying
• Sutter WWTP Overview
• Process Definitions
• Design Criteria
• Operational Strategy for each sub-system
• Key Control Variable
• Process Overview and Inspection Rounds Criteria for each system • Upstream and Downstream Impacts to the Sutter Processes • Process Operating Strategy
• Key Performance Indicators
• Process Sampling
• SCADA Information
• Hach WIMS Information
• Standard Operating Procedures
• Duties and Expectations
• Plant Operator II, I and Trainee
• Senior Plant Operator • Operations Supervisor • Plant Manager 2 #1..
- 93 -
Sutter WWTP Overview

BE AWARE
Know and understand how Sutter outputs affects Jennings inputs.

Optimizing Sutter processes reduces overall operating costs. 3 #1..
- 94 -
Discharge Permit Limits
Overview

BE AWARE
Read the NPDES permit for more detailed information.

Know and understand how it governs our work.

OBJECTIVE
Zero permit violations achieved through process control adjustments, operator initiative and data awareness. 4 #1..
- 95 -
Process Definitions • Influent Pump Station. Domestic waste is pumped into the Headworks by four constant-speed enclosed screw pumps. The pumps start and stop automatically in a lead-lag sequence according to wet well level, via the SCADA System. High-high wet well shuts all pumps down after a preset time delay. • Screening: Mechanical bar screens remove debris in the influent that may cause maintenance issues for process equipment and/or operational problems to the primary clarification or anaerobic digestion processes. The domestic flow passes through motorized gates to four climber-type mechanical bar screens. Each screen rake operates on a differential level, timer control, or manual, via the SCADA System. The screening drop onto a sluiceway which transfers into a combination Washer-Compactor, which washes than compacts the screenings and deposits them into a dumpster container for disposal. • Grit removal: Vortex –style grit basins are used to slow the influent flow velocity from greater than 2 feet/second to less than 0.5 feet/second. Flow from the bar screens passes through manual gates to four grit chambers. A motor-driven propeller in each chamber causes organic matter to stay in suspension while grit accumulates in the bottom trap, where it is pumped out as slurry by six pumps. The grit slurry is piped to four cyclone separators, which discharge the concentrated grit slurry into two Screenings Wash Presses (Huber Coanda units). Two screw conveyors deposit the dewatered grit into a dumpster container for disposal. • Flow Distribution. Effluent from the grit chambers flows through three motorized gates to three Parshall flumes. Flow in the flumes is measured by sonic level sensors and transmitted to the SCADA System. Manual gates then control the distribution of flow to either or both Primary Clarifiers. • Average Daily Flow (ADF): The actual average flow of sewage through the sewage treatment system in a 24-hour period, typically assumed to be 60% of the daily design flow. • Peak Daily Flow (PDF): The largest volume of flow anticipated to occur during a one-hour period, expressed as a daily or hourly average. • Solids Retention Time (SRT): The average time the sludge solids are in the digesters. • Hydraulic Residence Time (HRT): The average length of time that water remains in a process unit.

Overview

BE AWARE
Dangers of Sutter processes include raw sewage with potential of disease exposure, stairs, slippery surfaces, confined spaces, airborne vectors, equipment that automatically starts and stops, chemicals with low and high pH, and high voltage electricity.

Use PPE and safe working practices as required. 5
#1..
- 96 -
Process Definitions • Anaerobic bacteria. Bacteria that grow only in the absence of free or dissolved oxygen. • Anaerobic digestion. The degradation of concentrated wastewater solids (sludge, biosolids) during which anaerobic bacteria break down the organic matter into inert solids, water, carbon dioxide and methane. • Supernatant. The usually clear liquid overlying material deposited by settling. Supernatant from an anaerobic system generally contains high concentrations of dissolved and suspended solids, organic materials, nitrogen, phosphorus, and other materials. When returned to the treatment plant influent, these materials may impose an extra load on the liquid treatment processes. • Drying beds. Sludge-drying beds provide the simplest method of dewatering. A digested sludge slurry – decanted from Digesters 4 and 5 - is spread on an open bed of dirt and sand to a level of 14” and allowed to remain until dry. Entrained water evaporates.

After the digester contents are dry, the sludge is hauled to Jennings for land application on predetermined fields. • CFR Part 503 criteria. Digested sludge must meet these Federally-mandated parameters. SRT = 15 days or greater; sludge contents must be held at 95o
F or greater; and volatile solids destruction must be greater than 38%. The rule includes guidance as shown below. https://www.epa.gov/biosolids/plain-english-guide-epa-part-503-biosolids-rule Actual performance is reported annually, therefore the data required for the report must be comprehensive enough to demonstrate compliance.

Overview
6 #1..
- 97 -
Design Criteria
Sub-Process Units Total Design Capacity Individual Capacity Operational Strategy Influent Pump Station
Operate two to meet the anticipated daily flow rate. If heavy rain is forecast, place an additional one in service until the influent subsides back to pre-storm levels.

NOTE: Lag 3 pump is left in isolation standby to be used in case of a high wet well level. In case of high level, manually start this pump FIRST and then open the
isolation gate.
4 108 mgd 27 mgd Enclosed screw
pump, variable speed
Influent Screening
Operate two to meet typical peak day flow. Increase
number in use during storm events. 4 85 mgd 21.5 mgd
Climber screen:
8-feet wide with ¼-in
bar spacing
Used for high flow response.

If all four screens are running in fast mode for a
predetermined time (default operator setpoint is 10
minutes), the fifth screen will automatically start.

If wetwell level does not drop, the bypass gate 1 and
then bypass gate 2 will open.

ADF = 4 mgd
PDF = 10.5 mgd 1 4 mgd
Climber screen:
3-feet wide with ¼-in
bar spacing
Overview
7 #1..
- 98 -
Design Criteria
Sub-Process Units Total Design Capacity Individual Capacity Operational Strategy Grit Removal
Operate two to meet typical peak day flow. Increase
number in use during storm events. Vortex grit basin 4 90 mgd 30 mgd Grit pump 6 1,500 gpm 250 gpm One is always running for each grit basin.

Always operate one. Make certain the reserve unit is
ready to work when needed. 2 800 gpm 400 gpm
Grit washer, up to

1.5 ton per hour
throughput
Odor Control
Use both cells unless offline for maintenance. 35 seconds residence time with 3 to 6 inches WC differential pressure Biofilter 2
Overview
8 #1..
- 99 -
Design Criteria
Individual Capacity Operational Strategy Total Design
Capacity Sub-Process Units
Primary Clarification
Operate one; rotate annually and perform major
maintenance on the one out of service. • Diameter = 200 feet • Side Water Depth = 10 feet • Effective surface area = 31,400 ft2 38 mgd
76 mgd at
1,200 gpd/sf
overflow
rate
Clarifier 2
Operate one pump.

Pump run time is set to meet target sludge blanket depth.

Target sludge blanket depth is 1.5 feet measured 1/2 out from the sidewall.

Sludge moisture is targeted between 4 and 5 %. The
relationship between sludge blanket depth and moisture
content must be evaluated to optimize pump run time.

Sludge pump 4 --- --- Primary Effluent Pumping
Automated Strategy for Effluent Wetwell.

Operating Wetwell setpoint is 98-inches. Lead ON at 98- inches: OFF at 82-inches, Lag1 ON at 104-inches: OFF at 96- inches. Lag2 ON at 112-inches: OFF at 102-inches. Lag3 ON at 120-inches; OFF at 110-inches. Effluent wetwell overflows to overflow basin at 117-inches.

The intent is that pump Lag3 will never come on automatically.

The operator on duty determines if the fourth pump is needed or if flow should be split between the domestic line and the can-seg line. A fourth pump comes on only if the operator determines it is necessary.
4 69.2 mgd 17.3 mgd Primary effluent
pump
Overview
9 #1..
- 100 -
Design Criteria
Operational Strategy Individual
Capacity
Total Design
Capacity Sub-Process Units
Pumping Plant No. 3 (Can Seg Pump Station)
Operated seasonally when the cannery waste is being
generated by industries within the service area.

Flow from Pumping Station No. 3 can be diverted
through a pipeline to the domestic side of the Dryden
Box to enable primary treatment of a portion of the
cannery process water.

Pump Station 1 53.6 mgd n/a
Centrifugal pumps 3 53.6 mgd 13.4 mgd Operate two when pumping plant is in use.

Use to manage shoulder season flows. 1@ 4 mgd
1@ 8 mgd 2 12 mgd Low flow centrifugal pumps
3 54 mgd 10.3 mgd Operate two when pumping plant is in use.

Chain driven multi-rake
screens
3-feet wide with 3/8-inch
openings
Overview
10 #1..
- 101 -
Design Criteria
Operational Strategy Individual
Capacity
Total Design
Capacity Sub-Process Units
Anaerobic Digestion
Maintain enough thickened primary sludge volume to
achieve 503 CFR criteria for solids retention time. • Diameter = 104 feet • Side water depth = 32 feet Digesters 1 and 2 2 4.0 MG 2.0 mgd
Sludge Holding Tanks
Maintain enough empty volume to accommodate the
daily primary sludge production by transferring
contents to the drying beds. • Diameter = 60 feet • Side water depth = 22 feet; 19. 5 feet

0.47 MG

0.41 MG Digesters 4 and 5 2 0.91 MG
Digester 3 Decommissioned
Digester Heating
Operate one heat exchanger to maintain permit
required digester content temperature. Spiral Heat Exchangers 2 --- ---- Sludge Drying Sludge drying beds 24 21.2 acres 0.78 MG each Draw sludge 70,000 gallons on Tuesday and Thursday.

Overview
11 #1..
- 102 -
Emergency
Diversion
Structure
C
C
66” CSL
60” SS
7th Street
Diversion Structure
(Off-Site)
C
C
66”CSL
60” SS 60” Emergency Bypass West Trunk
Junction
Structure
Dryden Box
Influent
Structure
66” CSL
Cannery Segregation
Pumping Plant No. 3
Influent Pump Station
60” SS
Can Seg Bypass
84” SS
84” SS
12” In-Plant Drain
Junction
Box No. 1 60” West Trunk Sewer 60” River Trunk Line 60” West Trunk Sewer WTJS-SG1
WTJS-SG2
M
M
DRY-SG6
DRY-SG7
DRY-SG8
C
C
Influent Trunk
Flow Schematic
(NOT TO SCALE)

M MOTORIZED

SLIDE GATE (SG)

PLUG VALVE

SANITARY SEWER (SS)

CANNERY (CAN) SEGREGATION (SEG) LINE (CSL)

CANNERY WASTE DRAIN (CWD)
C
River Trunk
Junction Structure
60” River
Trunk (old)

MANHOLE
DRY-SG9
60” River
Trunk (new) 42” CWD To Jennings Plant
Influent Flow Overview
12 #1..
- 103 -
Cannery Pumping Plant #3
Inspection Rounds - Always confirm that the:

2. Bar screens are removing rags and the rakes are properly aligned with the bars.

1. Sampler Cannery 2-015 (in season) is working, and the sampler jug volume is increasing. Replace sampler tubing as needed.

Sampler refrigerator is at 6oC.

4. Lift pumps are running. Confirm petcocks for the pressure gages are open and gages are operable.

3. Valving alignment is correct and pump controls are in Auto.

6. HVAC is working to keep the temperature inside the Pumping Plant low enough to ensure MCC does not overheat.

5. Discharge pressure for the pumps in use is between 40 and 60 psig. Confirm seal water is flowing. Confirm the oil level is at least half full.

Sampler 2-015
MCC 6
4 3
2 1
5 13
#1..
- 104 -
Headworks
Inspection Rounds - Always confirm that the:
1 and 2. Sampler INF-001 (and Cannery 2-015 (in season)) are working, and the sampler jug volumes are increasing. Replace sampler tubing as needed. Sampler refrigerators are at 6oC.

6. Mass of rags is increasing in the hoppers. Change out hoppers as needed to prevent overflow and subsequent cleanup.

3. Influent pumps are turning, and the pump oil levels are within range.

4. Bar screens are removing rags and the rakes are properly 7. Grit pump 1 to 6 seal water is flowing at 30-35 psig. aligned with the bars.

8. Grit volume is increasing in the hopper. If not, take corrective action immediately.

5. Washer and compactor(s) are working, and the drains are not plugged.

Sampler 2-015
Compliance
Sampler INF1 001
2 5
4 7 6
8 3
4 4
3 4
20-INCH CW DIVERSION

GRIT SLURRY TO GRIT

WASHERS FERRIC

CHLORIDE

SUTTER TRUNK
12-INCH
14 #1..
- 105 -
Primary Clarification
Inspection Rounds - Always confirm that the:

1. Clarifier skimmer drive is turning for unit in service. 5. Effluent pump controls are in Auto.

6. Discharge pressure for the effluent pumps in use is between 40 and 60 psig. Confirm seal water is flowing. Confirm the oil level is at least half full.

2. Sludge pump is running. Confirm petcocks for the
pressure gages are open and gages are operable.

7. Effluent Sampler 2-025 is working, and the sampler jug volume is increasing. Replace sampler tubing as needed.

3. Scum pit level is changing. Remove any debris that has blown in.

8. Sampler refrigerator is at 6o

4. Scum pump is operating correctly. C.

9. HVAC is working to keep the temperature inside the Outfall Pump Station to ensure MCC does not overheat.

Outfall
Sampler
2-025
4 3
3 2
2 1
1 7 8
6 5
4 MCC
9 15
#1..
- 106 -
Digester Heating

DIGESTER
GAS

SCRUBBER
1 1 2
3 10 7 8 9
6 5
4 Inspection Rounds - Always confirm that the:

1. Digester (in service) content temperatures are above 95 2. Sludge recirculation pump(s) is running. o F.

4. Three-way valves between the boiler and heat exchanger are adjusting to changes in digester temperature.

3. Hot water pump(s) is running.

6. Mixing (recirculation) pump(s) is running, and the amps are within expected operating range of 50 to 60 amps. If not, take corrective action.

5. Heat exchangers temperature gages in and out are working and temps are within operating range.

8. Gas scrubber (inside the building) is running within expected ranges

7. Discharge hydrogen sulfide levels are less than 10 ppm when required

9. Gas scrubber suction and discharge condensate traps are 10. Debris is picked up and spills cleaned up. drained.
16 #1..
- 107 -
Anaerobic Digestion
Inspection Rounds - Always confirm that the:

1. Supernatant box is overflowing when digester is fed. 3. Gas pressure under valve is less than 16 inches WC.

4. Three condensation traps are drained at least once per day: one on the top of the digester; one at the side near the underground mix pump feed valves; one at the mix pump.

2. Gas pressure valves are operating to retain adequate pressure.
1 2 3 1 2 3
4 17
#1..
- 108 -
Digester 4 and 5
Outflow
Inspection Rounds - Always confirm that the:

2. Supernatant line is flowing, and floating sludge or scum is not plugging the overflow.

1. Liquid levels are comparable (unless sludge is being withdrawn from one only).

3. Sprinkler system is operating, and scum mat is broken up. 4. Rain Bird settings for sprinkler operation.

5. Pipe galley is in good shape and valving alignment 6. Feed valves are open (north side). matches sludge draw to bed strategy.

7. Supernatant valves are open (pipe galley). 8. Grab sampling at 2-065 for supernatant is completed.

9. Grab sampling at 2-085 for drying bed draw is completed. 9 5
4 3
3 2
2 1 1
8 7
6 7
18 #1..
- 109 -
Ferric Chloride Feed
Inspection Rounds - Always confirm that the:

Equipment may be reconfigured for odor control in the future 19 #1..
- 110 -
Impacts to the Sutter Processes
Influence Concerns Location to
Process
Shoulder seasonal discharges may arrive before or after Can Seg is in use. The sewage flow, strength and entrained debris may affect Sutter operations. Canneries Upstream
Discharge flow, strength and debris can be variable. Industries may ramp up or rap down production based on business factors and will not communicate those changes to Sutter operations.

Industries
Digester solids that overflow in the supernatant can be inert and may not settle in the primary clarifier. Excessive solids results in additional pumping from the primary clarifiers and increase digester heat demand.

Digester 4 and 5
Supernatant
Septage contains debris that increases screening volumes. Undesirable chemicals can be included in the discharge. Septage Receiving Station Tannins and Lignins may be entrained in the industrial discharges. These are soluble and flow through to Jennings, where they may affect UV transmittance.

Tannins and Lignins –
airborne ag dust
All outputs can affect Jennings Phase I and Phase II, as well as the land application rates. Downstream Sutter outputs
Sutter
20 #1..
- 111 -
Process Operations Strategies
Variable What it affects Comments
Headworks
Sampler 2-015 must be placed in service when Pumping Plant 3 is in use.

Equipment in use; influent
quality at Sutter and Jennings
CanSeg season and
shoulder seasons
NOTE: Lag 3 pump is left in isolation standby to be used in case of a high wet well level. In case of high level, manually start this pump FIRST and then open the isolation gate.

Pump #4 is put in service by the operator on duty.

Barscreen #3 – the bypass gates are opened.

High flow events Equipment in use
Primary Clarification
Variable What it affects Why use the strategy Where is it implemented Solids dryness (moisture) test
Denser sludge = longer detention time =
more stable digestion = greater volatile
solids reduction
Solids loading to
anaerobic digestion Sludge density
Adjusting sludge pump timer
Maintaining target blanket = consistent
sludge density and less soluble BOD
production = less biomass production at
Phase I and II
Sludge pump run
time Sludge blanket depth
Awareness

BE AWARE
Cannery and industrial flows and loads will affect treatment processes at Sutter and Jennings 21 #1..
- 112 -
Process Operations Strategies
Variable What it controls Why use the strategy
Anaerobic Digestion
Maintaining target time = more stable contents = better solids quality to settle in Digesters 4 and 5, less solids flow to divert to the drying beds (reduced solids handling costs) and greater gas production (less supplemental natural gas costs) Process
effectiveness
Solids retention time in
Digesters 1 and 2
Supernatant quality Hydraulic retention time in
Digesters 4 and 5
Sludge Drying
Maintaining less than 14 inches – determined by comparing the sludge level to the bottom of the sludge discharge piping – allows the sludge to dry quicker than an overfilled bed.

Sludge drying
efficiency Sludge level
The current practice is decanting 70,000 gallons of sludge from each digester (4 and 5) every Tuesday and Thursday. This practice may not be optimal.

Alternative strategies to determine how to minimize solids carryover in the the supernatant will be evaluated.

Feed strategy Sludge bed rotation

BE AWARE
Optimal anaerobic digestion operation reduces overall solids handling and power costs.

Awareness
22 #1..
- 113 -
Process Sampling
Comments
Required by
LIMS ID Site ID Type Analysis Typical range Permit
Influent to Primary Treatment Facility
Same sample for both BH26861 INF-001 Grab TKN@P_H2SO4 YES BH26861 INF-001 Grab PO4@P_H2SO4 YES
BH26862 INF-001 Grab AMMONIA@P_H2SO4 YES
BH26863 INF-001 Grab ALKALINITY@POLY1 YES
Same sample for all three
BH26832 INF-001 Comp BOD@POLY1 YES
BH26832 INF-001 Comp TSS@POLY1 YES
BH26832 INF-001 Comp VSS@POLY1 YES
BH26833 INF-001 Grab PH@POLY1 YES
Same sample for both BH26834 INF-001 Grab TKN@P_H2SO4 YES BH26834 INF-001 Grab PO4_FIA@P_H2SO4 YES
BH26835 INF-001 Grab AMMONIA@P_H2SO4 YES
BH26836 INF-001 Grab ALK_TOTAL@POLY1 YES
Same sample for all three
BH26859 INF-001 Grab BOD@POLY1 YES
BH26859 INF-001 Grab TSS@POLY1 YES
BH26859 INF-001 Grab VSS@POLY1 YES
BH26860 INF-001 Grab PH@POLY1 YES
Overall
23 #1..
- 114 -
Process Sampling
Comments
Required by
LIMS ID Site ID Type Analysis Typical range Permit
Primary Effluent
BH26853 2-025 Grab BOD@POLY1 YES
BH26853 2-025 Grab TSS@POLY1 YES
Digester Feed
BH26854 2-029 Grab #SOLIDS YES
Digester 2
BH26855 2-042 Grab PH#SOLIDS NO
Used to calculate the Volatile
acids to Alkalinity ratio, which
indicates digester health and
predict upset upset
BH26855 2-042 Grab ALK#SOLIDS NO
NO
TOTAL_VOLATILE_
BH26855 2-042 Grab ACID#SOLIDS
Digester 1-2
BH26856 2-045 Grab #SOLIDS NO
Digester 4-5
BH26857 2-065 Comp #SOLIDS NO
Digester to Bed
BH26858 2-085 Comp #SOLIDS NO
Overall
24 #1..
- 115 -
SCADA Information – Slide Number and Title
Sutter
Slide # Focus
600 WQC Sutter Facility
601 Sutter SCADA Communications
619 Well 15B
625 Clarifier #1
626 Clarifier #2
630 Digesters
631 Drying Beds Schematic
640 Effluent Pump Station
655 Wastewater Samplers
656 Ferric Chloride
699 Parallel Outfall Sewer
GBT Process obsolete – not in use
620 Gravity Belt Thickener
25 #1..
- 116 -
Standard Operating Procedures
SOPs
Title SOP ID
Headworks
High Plant Influent Flow Event Response SUT HEAD 1
Lift Pump In or Out of Service SUT HEAD 2
Barscreen In or Out of Service SUT HEAD 3
Grit System In or Out of Service SUT HEAD 4
Septic Receiving SUT HEAD 5
Odor Control In or Out of Service SUT HEAD 6
System Reset and Check SUT HEAD 7
Primary Clarification
Primary Clarifier In or Out of Service SUT PRI 1
Primary Sludge Pump In or Out of Service and Control SUT PRI 2 Primary Clarifier Blanket and Control SUT PRI 3
Primary Scum Pump In or Out of Service SUT PRI 4
Odor Control In or Out of Service SUT PRI 5
System Reset and Check SUT PRI 6
Chemical Feed
Ferric Chloride In or Out of Service and Control SUT CHEM 1 System Reset and Check SUT CHEM 2
26 #1..
- 117 -
Standard Operating Procedures
SOPs
Title SOP ID
Solids Handling
Digester In or Out of Service SUT DIG 1
Hot Water System In or Out of Service and Control SUT DIG 2 Recirculation Pump In or Out of Service and Control SUT DIG 3 Mixers In or Out of Service and Control SUT DIG 4
Digester Flare Operation SUT DIG 5
Digester Gas Handling Equipment Check SUT DIG 6
Boiler In/Out of Service/Control SUT DIG 7
Drying Bed Selection and Filling SUT DIG 8
Biosolids Testing and Application SUT DIG 9
Pumping Plant #3
CanSeg Barscreen In or Out of Service SUT CAN 1
Pumping Plant #2 Pumps In or Out of Service SUT CAN 2
Pumping Plant #3 Pumps In or Out of Service SUT CAN 3
Placing Can Seg in Service SUT FLOW 1
Taking Can Seg Out of Service SUT FLOW 2
System Reset and Check SUT FLOW 3
27 #1..
- 118 -
Operator II, I and Trainee Duties and Expectations
Duties
• Make Field Observations, such as: • Equipment status
• Instrument status
• Sampler status
• Safety conditions
• Confirm instrument and analyzer feedback and
calibrate as needed
• Review operational reports and SCADA trends daily
to keep up on process performance
• Take corrective actions as needed
• Initiate maintenance work orders when required to
correct equipment issues
• Perform housekeeping and maintenance tasks
Expectations
• Perform process and equipment condition assessments
and observations
• Conduct field measurements and tests as required
• Record field data
• Take corrective actions to re-establish operational targets • Take equipment in and out of service as needed
• Report to Plant Operations Supervisor on duty about
process conditions
• Report all irregularities to Plant Operations Supervisor on duty
• Share field observations with fellow operators
• Complete daily maintenance tasks
• Fill out logbook; include date, full first name and last name initial, what equipment is in use, not in use, what changes were made, what was done in the area
Sutter
28 #1..
- 119 -
Senior Plant Operator Duties and Expectations
Duties
• Correct unsafe working practices immediately • Work with the Operations Supervisor to minimize disruptions to daily wastewater processing while
achieving desired preventive and corrective
maintenance goals • Confirm less-experienced operators understand process goals and objectives
• Ensure control action is taken when needed to meet
process targets
• Support process operations coordination with
maintenance work
• Identify documentation needs and support changes
• Advise Operations Supervisor of all irregularities
• Support training needs and methods to develop a wellrounded Operations staff Expectations
• Make certain all workers – City or contractor - are
working safely
• Support Plant Operators while conducting their duties.

Provide guidance and refresher training as needed, • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other
treatment processes
• Monitor equipment setpoints to ensure units are
operating at target setpoints to achieve required
performance
• Ensure corrective action is taken when needed
• Provide equipment isolation and restart timing and
procedures
• Develop and maintain appropriate SOPs
• Evaluate control systems screens, trending, and data to optimize processes and operating costs
Sutter
29 #1..
- 120 -
Plant Operations Supervisor Duties and Expectations
Duties
• Manage and supervise process operations
• Follow up on Plant Operator’s completion of duties
• Initiate adjustments as needed. Provide oversight for process adjustments to maintain permit compliance
• Provide guidance to achieve production and optimization goals while minimizing operating and maintenance costs
• Visually observe all process units a minimum of once/shift • Review operational reports and SCADA trends daily to keep up on process performance
• Ensure control action is taken when needed to meet
process targets
• Visually observe all process units a minimum of once/day • Coordinate maintenance work order response with process operations
• Discuss delays in or disruptions from maintenance work with Maintenance counterparts
• Advise Plant Manager of all irregularities
• Coordinate training activities and programs
Expectations
• Make certain all workers – City or contractor - are working safely
• Monitor plant operators while conducting their duties.

Provide guidance and refresher training as needed. • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed
• Coordinate changes and adjustments with other treatment processes
• Monitor equipment setpoints to ensure units are operating at target setpoints to achieve required performance
• Visually observe all process units a minimum of once/shift • Ensure corrective action is taken when needed • Provide equipment isolation and restart timing and
procedures
• Develop and provide contingency plans
• Develop and maintain appropriate SOPs
• Confirm control systems screens, trending, and data
consistently reflect field conditions
Sutter
30 #1..
- 121 -
Plant Manager Duties and Expectations
Duties
• Determine compliance requirements • Direct optimization efforts • Work with the Maintenance Manager to minimize
disruptions to daily wastewater processing while
achieving desired preventive and corrective
maintenance goals • Establish process goals and objectives • Predict expected flows and loads • Track actual flows and loads and recommend optimization actions
• Establish boundary limits for contingency plan actions • Review process sampling needs and data reporting
requirements every six months
• Identify documentation needs and changes
• Direct control system quality and upgrades
• Establish training needs and methods for each tier of Operations staff
Expectations
• Make certain all workers – City or contractor - are
working safely
• Provide oversight to ensure Directives are met • Use analysis tools where appropriate to optimize daily operation and determine corrective response
actions
• Compare unit performance data to expectations,
then provide feedback to the Operations staff with
recommendations as needed
• Maintain e-based trending compliance and
performance measurements
• Maintain the online O&M Manual • Confirm Plant Operations Supervisors are making process control actions that align with desired results • Provide equipment isolation and restart timing and
procedures
• Guide development of contingency plans
• Guide development of appropriate SOPs
• Direct training and skills measurement
Sutter
31 #1..
- 122 -
Notification
RECORD
the time
of each
action
The Operations Supervisor receives a
call from about a sanitary sewage
overflow or other offsite problem
The Operations Supervisor receives a
call from a plant operator about a
potential permit violation or other
problem at Sutter or Jennings
Notification
Operations Supervisor: Has VERBAL discussion with WQC Superintendent immediately.

WQC Superintendent: FOLLOWS RWQB notifications and procedures and process.

Immediately CONTACTS Public Works Director.

WQC Superintendent: VERBALLY INITIATES Critical Incident Response investigation with Operations Supervisor.

Operations Supervisor: PROVIDES draft Critical Incident Response report to Operations Superintendent.

Operations Supervisor: INTERVIEWS Plant Operators to get the details for the Critical Incident Response report.

WQC Superintendent: Reviews incident details with Public Works Director PROVIDES Critical Incident details to RWQB.

WQC Superintendent • DIRECTS staff to evaluate response for potential improvements • ENSURES improvements are completed in a timely manner #1..
- 123 -
Jennings – Interior
Area Management Plan
1 Version Date revised Version Approved
Version 1 March 2021
Exhibit C
#1..
- 124 -
Table of Contents
Interior processes include
• Pumping Station #2 (Can Seg) • Fixed Film Reactors
• Fixed Film Reactors Pump Station
• Facultative Ponds
• Storage Ponds
• Storage Pump Station
• Recirculation Channel • Ranch
• Jennings WWTP Overview
• Facility Flow Diagrams
• Process Definitions
• Design Criteria and Operational Strategy for each sub-system • Inspection Rounds Criteria for each system
• Upstream and Downstream Impacts to the Interior Processes • Key Performance Indicators
• Process Awareness - Ranch • Process Sampling
• SCADA Information
• Standard Operating Procedures
• Duties and Expectations
• Plant Operator II, I and Trainee
• Senior Plant Operator • Operations Supervisor • Operations Superintendent 2 #1..
- 125 -
Jennings WWTP Overview
Storage
Pump
Station
Phase 1
Phase 2
Compost
Fixed Film
Reactors
Storage
Pond 2
Storage
Pond 1
Storage
Forebay
Facultative
Pond No. 2
Facultative
Pond No. 3
Facultative
Pond No. 1
Irrigation Channel
Recirculation
Channel
Irrigation
Reservoir
Irrigation Pump
Station
San Joaquin River
Discharge Point
Mixing
Box
FFR Pump
Station
Pumping
Plant #2
(Can Seg)
Delta-Mendota Canal
Discharge Point – 7
miles west Effluent
Pump
Station
3 #1..
- 126 -
4 Treatment Systems Input and Outputs #1..
- 127 -
Facility Flow Diagram
Information
5 #1..
- 128 -
Land Application Permit Limits

BE AWARE
Read the permit for more detailed information.

Know and understand how it governs our work. 6
Land Application
Reporting
frequency
Monitoring
frequency Parameter Units Sample Type
Wastewater flow rate Inches or gallons per day Calculation Daily Quarterly Supplemental irrigation flow rate Inches or gallons per day Calculation Daily Quarterly Precipitation (to 0.1 inch) Inch Rain gauge Daily Quarterly Total water application rate Acres Observation Daily Quarterly Acreage used for land application Acres Observation Daily Quarterly BOD loading rate, cycle average lb/ac/day Calculation Monthly Quarterly Total nitrogen loading rate lb/ac Calculation Monthly Quarterly Fixed dissolved solids loading rate lb/ac/day Calculation Monthly Quarterly • Loading rates shall be calculated for each Use Area field. • BOD loading rate shall be calculated using the daily applied volume of wastewater, actual application area, and most recent BOD results for the wastewater. • Total nitrogen loading rate shall be calculated using the applied volume of wastewater, actual application area, and the most recent total nitrogen results for the wastewater. • Loading rate for supplemental nitrogen (including commercial fertilizers, manure from cattle, etc.) shall be calculated using the actual load and application area. • Fixed dissolved solids (FDS) loading rates shall be calculated using the daily applied volume of wastewater, actual application area, and most recent FDS results for the wastewater.
#1..
- 129 -
Cannery Waste from Sutter Pumping Plant #2 Irrigation Reservoir Mix Box Ranch Irrigation System Cannery Waste Flow Path Cannery waste is blended with secondary effluent in the Irrigation Reservoir mix box Irrigation Flow Path
North Recirc
Channel
West Recirc
Channel
South Recirc
Channel
East Recirc
Channel
North Recirc
Channel
Recirculation Flow Path Primary effluent can go to the North Recirc Channel - OR - the NRC can flow into the FFR Mixing Box Storage Pond 2 Irrigation Forebay Irrigation Pump Station Irrigation Reservoir Irrigation Reservoir Mix Box
Low Flow Conditions Sutter Effluent to Phase I and II Flow Path Recirc Diversion Box FFR mixing box
Pri Effluent
Pump Stations
1 and/or 2
FFR Effluent
Box
Dilution Pump
Station
Phase I or
Phase II
Effluent
Disposal
Options
Primary Effluent Pump Stations 1 and/or 2 Phase I or Phase II Effluent Disposal Options Normal Conditions of Sutter Effluent to Phase I and II Flow Path Internal Flow Routing Path
Facultative
Ponds 1, 2 and 3
Effluent Collector S Eff Collector Discharge Pipe Storage Forebay Storage Ponds 1 and 2 Storage Afterbay Irrigation Forebay Irrigation Reservoir Ranch Irrigation FFR mixing box FFR Pump Station Fixed Film Reactors FFR Effluent Box Recirc Channel Facultative Pond Inlet Box
Flow can be diverted from the Collector Discharge Pipe to the Irrigation Forebay Emergency option
7 #1..
- 130 -
Process Definitions • Cannery Segmentation: Food-processing water can be treated by applying it to the ranch land, or through the Fixed Film Reactors. Because the canning season coincides with the peak growing season, both domestic secondary effluent and food process water are combined and applied to the land for irrigation. The volume of food process water that can be used for irrigation is limited the biochemical oxygen demand (BOD) loading rates and require that the process water be applied at agronomic rates to prevent over-watering. • Facultative Ponds: The first pond is like a primary clarifier, where heavier solids settle to the bottom and lighter solids float.

Anaerobic organisms live in the accumulated sludge on the bottom. The surface area provides an atmospheric oxygen transfer rate adequate to prevent anaerobic conditions on the surface. Intermediate depths support facultative microorganisms that oxidize the dissolved and suspended organics from the primary effluent and the anaerobic products on the bottom, reducing the BOD of the sewage. Facultative pond effluent can be used to dilute the primary effluent from Sutter. The effluent from these ponds may not meet the nitrogen compounds discharge permit criteria, which resulted in the additions of Phases I and II. • Storage Ponds: Effluent storage ponds are used to store undisinfected secondary effluent when conditions do not allow either land, canal or river discharges. The stored volume is emptied – either by discharging to the river or using it for irrigation – as required to maintain the overall water balance of influent and effluent flow. • Recirculation Channel: The recirculation channel connects all facultative ponds. Pumps allow the contents to be recirculated for additional treatment. The channel allows isolation of each pond for maintenance if required. • Fixed Film Reactors: The FFRs are an attached-growth aerobic treatment system that use microorganisms attached to plastic media to remove organic matter from Sutter primary effluent or water from the facultative ponds. Influent and recirculated flow enters the biotower through distributor arms. The distributor arms circulate and evenly spread the wastewater across the top of the media. The wastewater then flows down through the media, where it is treated by the bacteria attached to the media and exits the biotower. The effluent flows to the FFR effluent box then into the East Recirculation Channel. • Firm Capacity: The output of a process or capability or equipment with one unit out of service (n-1). 8 #1..
- 131 -
Process Definitions • Can Seg Season: Combined cannery waste and/or secondary effluent is used for pasture irrigation through a network of piping and pump stations. Secondary effluent is stored in the Irrigation Reservoir and mixed with cannery waste (when available) in the Mixing Box. • Irrigation Pump Station: The Irrigation Pump Station discharges secondary effluent through a 54-inch force main to the Irrigation Reservoir. • Booster Pump Stations: Booster Pump Stations send irrigation water to the Ranch sites. • Tailwater Pump Stations: Tailwater Pump Stations return any runoff to the distribution system, Recirc Channel, Irrigation Forebay, or Irrigation Reservoir or bypass it to the drainage slough during non-irrigation wet weather winter mode. • Land Application: Application of partially treated wastewater or biosolids to the Ranch. • Ranch: Land application area that receives partially treated (undisinfected) secondary treated water, cannery segregation water, and biosolids.
9 #1..
- 132 -
Design Criteria
Facultative Treatment
Volume, MG Average Depth, feet
* = without settled solids Component Surface Area, acres Pond 1 102 6.0 * 200
Pond 2 114 5.8 * 215
Pond 3 118 5.3 * 204
Recirculation channels 126 5.1 * 166
BOD loading 10,000 lb/day average 20,000 lb/day maximum Operational Strategy
Use all ponds for BOD reduction. Track influent BOD to evaluate BOD loading rates.

FFR effluent flows through the Recirculation Channel before entering the Facultative Ponds.

The Recirculation Pump Station conveys wastewater through the Recirculation Channel. Wastewater in the East Recirculation Channel is pumped through the Influent Header into the Facultative Ponds.

Flow exits the Facultative Ponds to the Effluent Collector. From the Effluent Collector, secondary effluent can be conveyed through three pathways.

1. Directed to the Storage Forebay, where it is pumped to the Storage Ponds.

2. Directed into the Irrigation Forebay, where it can be pumped to the Irrigation Reservoir by the Irrigation Pump Station.

3. Pumped back into the Facultative Ponds using the Storage Pond Return Pump Station.

The Effluent Collector can also be used to convey secondary effluent from Storage Pond 2 into the Irrigation Forebay using the second pathway.

BE AWARE
Dangers include raw sewage with potential of disease exposure, stairs, slippery surfaces, confined spaces, airborne vectors, equipment that automatically starts and stops, and high voltage electricity.

Use PPE and safe working practices as required. 10
#1..
- 133 -
Design Criteria
Fixed Film Reactors
Operational Strategy Firm Capacity,
MGD
Capacity,
MGD each Component Number
Split the flow evenly between FFR#1 and FFR#3.

FFR #2 is not an option. 18 19 3 (only 2 can be used) Fixed Film Reactors Statistics, each: • 140 ft D x 22 ft H
• Surface area = 15, 286 ft2
• Media volume = 33,492 ft3
• BOD loading = 370 lb/day per 1,000 ft3
Use one pump per FFR in use to always maintain a
flow of 28.8 MGD. FFR feed pumps 9 14.4 28.8 to each FFR Ranch/Cannery Waste Pumping Station
Use as needed. Rotate periodically to allow for
maintenance. Cannery waste pumps 3 14 28
11 #1..
- 134 -
Facultative Pond Effluent Pumping
Operational Strategy Firm Capacity,
MGD
Capacity,
MGD each
Number Component
Operate at least 3 of 4 vertical propeller pumps located in the East Recirculation Channel to maintain circulation in the Recirculation Channel.
4 112 336 Recirculation
pumps
Inlet pumps 9 9.2 18.4 to each pond Operate at least 2 of 3 pumps to each pond.

Effluent Storage
Operational Strategy Approximate
Volume, MG Depth, ft Surface Area, acres Component
Provide storage for irrigation and provide additional
detention time to further reduce BOD. The maximum
surface elevation is 56.00 feet; the minimum elevation is 44 feet.

Pond 1 197 13 834
Pond 2 399 13 1,690
Afterbay 50 13 285
Firm Capacity,
MGD
Capacity,
MGD each
Maintain target level in the Storage Pond Forebay, which can only be adjusted through supervisory oversight and
interdepartmental coordination. Maximize water in the
storage ponds while maintaining consistent flow from the collector channel.
4 19.5 58.5 Storage (feed)
pumps
Depending on the water levels in Storage Pond 2 and the Facultative Ponds, the stored water can be returned by
gravity or by using the Return Pump Station.

The gravity flow pathway to the Return Pump Station wet well is the same flow path used to convey flows from
Storage Pond 2 to the Irrigation Forebay with the Effluent Collector.
2 7.2 7.2 Return flow
pumps
Design Criteria
12 #1..
- 135 -
Effluent Pumping
Operational Strategy
Firm
Capacity,
MGD
Capacity,
MGD each Component Number
3 20 40 Return excess Ranch irrigation water via the Ranch drainage system. Drainage pumps
Ranch/Cannery Waste Pumping Station
Flow from the Can Seg Outfall is sent to the Irrigation Reservoir Mix Box using the Cannery Waste Pump Station. 3 14 28 Cannery waste pumps Irrigation
Maximize water in the irrigation reservoir while maintaining consistent flow across the irrigation forebay. Do not exceed the low-level shutoff. 3 13.6 27.1 Irrigation pumps Depth, ft Volume, MG
Surface
Area,
acres
• During the non-canning season, secondary effluent in the Irrigation Reservoir is discharged directly to the Ranch Irrigation System. • During the canning season, secondary effluent in the Irrigation Reservoir is sent to the Irrigation Water Mixing Box and combined with the cannery process water before being discharged to the Ranch Irrigation System. • Overflows from the Irrigation Reservoir and Irrigation Water Mixing Box are directed to the Recirculation Channel. • Tertiary effluent can be diverted to the Reservoir via the Tertiary Irrigation Reservoir Bypass Valve.

Reservoir 2.4 13 8.7
Note: During irrigation season, a portion of the Irrigation Forebay Water can enter the Irrigation Forebay either from the Effluent Collector (via a small control structure) or from the Storage Afterbay. From the Irrigation Forebay, secondary effluent is directed to the Irrigation Reservoir through the Irrigation Pump Station. After irrigation season, this storage pond bypass must be closed Design Criteria
13 #1..
- 136 -
Design Criteria
Component Number Operational Strategy
Ranch
Acres under irrigation 2,450
Note: Fields 1 and 3 are not usable.

See Field Sizing and Awareness slide. Field sites 31
Manually operated by the contracted irrigator during non-can seg season. Used to provide pre-irrigation water to the fields west of Jennings Road. These pumps are supplied from the Irrigation Forebay.

NOTE: Plant operators must record daily usage flow.

Booster pump stations 3
Main tailwater pump stations 12 NOTE: Leave pump HOA switches in AUTO.

Secondary tailwater pump stations 3 NOTE: Leave pump HOA switches in AUTO.

BE AWARE
Water volume management is crucial to permit compliance.  Know what volumes and qualities are located.
 Know what approach provides the overall lowest operating costs.  Know the blending strategy required to keep Phases I and II at maximum capacity to optimize those operating costs. 14 #1..
- 137 -
Item Statistic
Total storage pond capacity +/- 2.5 billion gallons
199.6 million gallons 1-foot depth in storage
ponds 1 and 2

19.9 million gallons 1/10-foot depth in storage
ponds 1 & 2
54 million gallons 1-foot depth in recirculation
channel

5.4 million gallons 1/10-foot depth in
recirculation channel
Exits 60 to 100 days later A gallon of water entering
the facility
~ 5 million gallons per day Average evaporation year
round
Storage Ponds 1 and 2 +/- 600 surface acres
Ranch acres under irrigation ~ 2,460 acres
Facility and pond acres 1,200 acres
Design Criteria

BE AWARE
Water volume management is crucial to permit compliance.  Know what volumes and water qualities to maintain permit compliance.  Know the blending strategy to minimize loading to each field.  Know what overall irrigation strategy provides the overall lowest operating costs.

BE AWARE
When driving this route, check
the air relief valves.
15 #1..
- 138 -
1 to 5
FFR 2 is
not used
Fixed Film Reactors
Inspection Rounds – confirm that the:

1. Distributor arms are rotating, and ports are not plugged. 4. Ponding is not happening. Ponding reduces filter effectiveness.

2. Flow to reactors in use are equal by evaluating flow discharge from 5. Four ventilation fans are running. each distributor arm.

3. Media is wetted equally. Over- or under-wetting reduces media Nights = Lighting is working. Report any failed lights. effectiveness.

Objective: Reduce BOD prior to Phase I and II and facultative ponds.

MCC S
S
1 to 5
16 #1..
- 139 -
9 FFR 2 is
not used
Fixed Film Reactors
Inspection Rounds – confirm that the:

8. Influent Sampler 3-001 is working, the volume in the sample jug is increasing, and the sampler refrigerator is at 6oC.

6. Seal water to FFR inlet pumps is flowing. Record hour meter readings.

9. Effluent Sampler 3-019.9 is working, the volume in the sample jug is increasing, and the sampler refrigerator is at 6oC.

7. MCC buckets are in working condition, with no tripped breakers or other problems.

Objective: Reduce BOD prior to Phase I and II and facultative ponds.

MCC S
S
8 7
6 17
#1..
- 140 -
Secondary System Flow Routing
Inspection Rounds – confirm that the:

1. Plant influent flow is totalizing. 4. Weather station is functioning.

2. FFR effluent flow is totalizing. 5. Storage Pond 1 level is within the operating range.

3. Recirculation Channel is within the operating range. 6. Storage Pond 2 level is within the operating range.

7. Irrigation Forebay level is within the operating range. 7 5 6
4 3
2 1
18 #1..
- 141 -
Facultative Ponds
Inspection Rounds – always confirm that the:

3. Recirculation Pumps 1 through 4 are running. Record which ones are RUNNING and which ones are OFF.

1. Facultative Pond Influent Pumps 1 through 9 are running. Record which ones are RUNNING and which ones are OFF.

2. Record Facultative Pond Influent Pumps H-O-A switch position. 4. Record Recirculation Pumps H-O-A switch position.

5. Sampler 3-0199 is working, the volume in the sample jug is increasing, and the sampler refrigerator is at 6oC.

S
1 2
3 5
4 Confirm that the pond elevations are
within the operating range
19 #1..
- 142 -
Storage Ponds
Inspection Rounds – always confirm that the:

1. Storage Pond Pumps 1 through 4 are running. Record which ones are RUNNING and which ones are OFF.

2. Record the Storage Pond Pumps 1 through 4 H-O-A switch position. 1 2 Confirm that the pond elevations are
within the operating range
20 #1..
- 143 -
Inspection Rounds – always confirm the:

1. Influent qualities by taking a grab sample 1 time per week 3. Pump discharge pressure is 8 to 12 psig. at the Mixing Box.

4. Seal water pressure is a minimum of 6 psi above the
discharge pressure for the pumps in service.

2. MCC buckets are in working condition, with no tripped breakers or other problems.

5. Valving is aligned as directed.

Cannery Waste Pumping Plant #2
MCC
1 2
3 SURGE
RELIEF
VALVES

WETWELL

EXHAUST
FAN

BIOFILTER
4 VALVE 103

LOW FLOW PIPE
3 4
5 21
#1..
- 144 -
MCC
1 2
3 SURGE
RELIEF
VALVES

WETWELL

EXHAUST
FAN

BIOFILTER
Cannery Waste and Irrigation Water Blending
A. The cannery waste force main discharges to the Mixing Box.

B. Effluent from the Irrigation Reservoir flows into the mixing box through Butterfly Valve (BV) 202.

C. Mixed cannery waste and secondary effluent flows out through BV 201 into the Ranch irrigation system through a flow meter.

D. BV 205 is normally closed so that the cannery waste and secondary effluent will mix in the box.

E. If the level in the Mixing Box is higher than the Reservoir, BV 202 will close automatically to prevent cannery waste from flowing into the Reservoir.

F. An overflow weir at elevation 64.50 feet allows the mixing box to overflow into the overflow chamber.

G. The overflow connects to the Reservoir overflow line, which discharges into the East Recirculation Channel.

H. A manual sluice gate is used to drain the Mixing Box into the Recirc Channel using the overflow line. 22 #1..
- 145 -
Storage Pond Effluent Control Valve
Inspection Rounds – confirm that the

1. Storage Pond Effluent Valve control is in the desired FLOW or LEVEL mode (at SCADA). NOTE: Leave LOR switch in Remote.

Irrigation The Valve modulates to maintain the level setpoint in the Afterbay 1 23
#1..
- 146 -
Primary Outfall Pipeline Check Valves – Sutter to Jennings Inspection Rounds – confirm that
Sewage is not discharging or has pooled under the valves. Any spillage is cleaned up immediately. 24 Task
Sample Operator monitor check valves on the way out to Jennings plant and on your return to Sutter Plant North side of Whitmore Avenue West of Carpenter West side of Vivian Road in the 4200 block #1..
- 147 -
Primary Outfall Pipeline Check Valves – Sutter to Jennings Inspection Rounds – confirm that
Sewage is not discharging or has pooled under the valves. Any spillage is cleaned up immediately. 25 Task
Sample Operator monitor check valves on the way out to Jennings plant and on your return to Sutter Plant South/West side of Jennings Road
and Keyes Road
#1..
- 148 -
Ranch Overview
26 #1..
- 149 -
• The Irrigation Pumps are controlled automatically in a lead-lag-follow-standby sequence to maintain the level setpoint in the Irrigation Reservoir. • Effluent stored in the Irrigation Reservoir flows by gravity to the throttling valves at the distribution boxes for the Ranch sites, either alone or with cannery waste mixed in. • Booster Pump Stations (BPS) discharge irrigation water to the Ranch sites. BPS #1 draws secondary effluent from the Irrigation Forebay. BPS #2 and BPS #3 boost the flow in series to the sites. The Booster Pump Stations are operated manually. Monitor these closely to confirm that irrigation demands are met without overflowing the boxes. • Fifteen Tailwater Pump Stations, with one submersible pump each, are started and stopped by high- and low-level floats. 27 Field Sizing
Field number Irrigation area(acres) Field number Irrigation area (acres) 2 47 19 80
4 55 20 20
5 45 21 80
6 25 22 80
7 123 23 93
8 55 24 107
9 55 25 120
10 110 26 90
11 110 27 62
12 27 28 64
13 120 29 115
14 67 30 100
15 128 31 100
16 60 32 100
17 100 33 100
18 20 Total, all fields 2,458
Field Sizing and Awareness #1..
- 150 -
Land application area (LAA) monitoring
The land application area which receive recycled water are considered agricultural recycled water Use Areas. Monitoring of the LAAs shall be conducted during the irrigation season on days when irrigation occurs.

Inspection Rounds – always confirm the:

Operation of each booster pump station. Operation of each tailwater pump station in use.

Investigate any beacons and address alarm conditions
immediately.

Conditions in the drainage sloughs. Remove weeds and
debris.

Inspect the LAAs at least once weekly prior to and during irrigation events. Observations shall be included in the quarterly monitoring reports.

The following items shall be documented for each field to be irrigated on that day:

1. Evidence of erosion

2. Field containment berm condition

3. Condition of above-ground pipes, flow control valves, and other distribution parts

4. Soil saturation and or ponding

5. Irrigation supply and tailwater ditch condition and potential for runoff to off-site areas

6. Potential and actual discharge of wastewater or biosolids to off-site areas, including surface waters

7. Odors that have the potential to be objectionable at or beyond the property boundary

8. Insects present (e.g. flies, mosquitos)

9. Temperature

10. Wind direction

11. Any corrective actions taken to remedy Items 1 to 7.

If no irrigation with wastewater takes place during a given month, note that in the monitoring report.

Land application area (LAA) monitoring
28 #1..
- 151 -
Tailwater Configurations
29 #1..
- 152 -
Impacts to Interior Processes
Influence Concerns Location to
Process
Warmer temperatures can increase the portion of BOD that is soluble. Soluble BOD (sBOD) is consumed first by the denitrifying organisms. Warmer effluent can result in more efficient nitrate removal.

Primary clarifier
effluent (Jennings
influent) temperature
Transit time, combined with warmer temperature, allows more biological action in the sewer, which can create septicity and reduce the amount of soluble BOD and increase filamentous organisms.

Sewage flow retention
time from Sutter to
Jennings
Volume and strength affect irrigation processes. The cannery waste segregation season (permitted as July 1 to September 30) may not align with the industries' processing schedule. It is possible that cannery waste can be received when Pumping Plant #2 is not operating. This higher strength flow can affect Phase I, Phase II and the Interior processes.

Cannery waste flow
Ranch loading Interior plant operations impact water availability for cannery segregation blending.

Downstream
Maintain a consistent flow rate through Phases I and II reduces variability, which improves MBR and UV performance.

Primary
effluent/dilution water
pumping rate
Water returned from the facultative ponds is necessary to limit nutrient loading from high strength primary effluent. Phase I is designed to treat a maximum BOD load of 400 mg/L. Phase II is designed to treat a maximum BOD load of 290 mg/L.

Make-up (dilution)
water flow and quality
Chemical or fuel spills that drain to the Recirc Channel could disrupt the BNR and Irrigation processes. In-plant drains
Ranch drainage Drainage can return ammonia and other compounds to the Irrigation Forebay.

Compost drainage Leachate can return ammonia and other compounds to the Recirculation Channel. 30 #1..
- 153 -
Impacts to Interior Processes
Influence Concerns
Volume and strength affect irrigation processes. The cannery waste segregation season (permitted as July 1 to September 30) may not align with the industries' processing schedule. It is possible that cannery waste can be received when Pumping Plant #2 is not operating. This higher strength flow can affect Phase I, Phase II and the Interior processes.

Cannery waste flow
Ranch loading Interior plant operations impact water availability for cannery segregation blending.

The effluent quality affects the loading rate on the various sites on the Ranch. Storage Pond Afterbay effluent
The effluent quality affects the loading rate on the various sites on the Ranch. More BOD means shorter application times per Ranch section. Mixing box effluent Chemical or fuel spills that drain to the Recirc Channel could disrupt the BNR and Irrigation processes. In-plant drains
Tailwater quality Entrained compounds from field runoff or rain are reintroduced to the facultative ponds Ranch drainage Drainage can return ammonia and other compounds to the Irrigation Forebay.

Compost drainage Leachate can return ammonia and other compounds to the Recirculation Channel. 31 #1..
- 154 -
Process Operations Strategies
Variable What it controls Why use the strategy Where is it implemented Fixed Film Reactors
FFR Influent Mix Box BOD removal efficiency TSS, BOD and ammonia loadings to the Interior Ponds, Phase I and Phase II
Routing of Sutter primary
effluent over the
available trickling filters
Facultative Ponds, Recirculation Channel, and Storage Ponds Mixing box To comply with water volume
delivery expectations Storage withdrawal rate Water balance Variable Units Awareness
Ranch
Hydraulic loading gpd Do not exceed hydraulic loading (watering) limits Do not exceed solids loading limits. Calculate concentration times flow to determine pounds. BOD loading lb/day
Do not exceed solids loading limits. Calculate concentration times flow to determine pounds. Nitrogen loading lb/day
Do not exceed application limits. Note: The fertilizer product use is combined with the BOD or Biosolids loading rates to determine the total amount of fertilizer applied. Fertilizer usage pounds Biosolids loading lb/day Do not exceed solids loading limits.

Tailwater run time hours Optimize hydraulic application rates.

Crop patterns Information Different crops uptake fertilizer differently. 32 Process Awareness
#1..
- 155 -
Key Performance Indicators - Interior
Variable Location Units Operating Range Purpose
Facultative Pond 1 feet 41 to 42 feet Must maintain 2 feet of freeboard Surface Elevation
Facultative Pond 2 feet Must maintain 2 feet of freeboard Facultative Pond 3 feet Must maintain 2 feet of freeboard Must maintain 2 feet of freeboard while ensuring there is adequate water for irrigation 44 to 56 feet Storage Pond 1 feet Storage Pond 2 feet
feet 40 to 44.5 feet Must maintain 2 feet of freeboard Recirculation Channel
Sets and/or adjusts Phase I blending strategy of less than 290 mg/L 3-0199 mg/L Recirc Channel
BOD
MGD Sets and/or adjusts blending strategy Irrigation Reservoir Mix Box
Irrigation
Discharge flow
CanSeg flow MGD Sets and/or adjusts blending strategy
No less than 1 to 1 Irrigation flow must be greater than CanSeg flow Irrigation Reservoir Mix Box
Blending ratio,
CanSeg flow and
Pond water quality
CAN-SEG mg/L TBD Maintain permit compliance with respect to the Ranch Irrigation
Discharge BOD, in
CanSeg season
IRR-FOR mg/L TBD Maintain permit compliance with respect to the Ranch Irrigation
Discharge BOD, not
CanSeg season
Irrigation per field Fields 2 to 33 hours n/a Track compliance of no longer than 72 hours per field Total hours of irrigation for Fields 2 to 33, no longer than 72 hours per field, typically 2 to 3 (and no more than 5) fields at a time
Irrigation total Fields 2 to 33 hours n/a
33 #1..
- 156 -
Process Sampling
Comments
Required by
Typical range Permit
Grab or 24-hour
Process Area Frequency Composite
Fixed Film Reactors
TSS 2x/week (T and TH) Comp NO FFR Influent, 3-001
BOD 2x/week (T and TH) Comp NO FFR Influent, 3-001
TSS 2x/week (T and TH) Comp NO FFR Effluent, 3-010
BOD 2x/week (T and TH) Comp NO FFR Effluent, 3-010
Pond System
BOD 2x/week (T and TH) Comp NO Recirc Channel Effluent, 3-0199 Ammonia 2x/week (T and TH) Comp NO Recirc Channel Effluent, 3-0199 Ammonia 1x/week (T) Grab NO Storage Pond Influent, 3-660 Ranch Irrigation
Conductivity 1x/week (T) Grab NO Drain
Do Not Exceed
YES IRR-FOR (in Season) Low = 6.5
High = 8.5 pH 1x/week (T) Grab
TSS 1x/week (T) Grab Max Daily = 20 mg/L YES IRR-FOR (in Season) Metals 1x/week (T) Grab See permit YES IRR-FOR (in Season) YES IRR-FOR (in Season)
Apr 1 to Sep 30 = 1.5 mg/L
Oct 1 to Mar 30 = 2.8
mg/L
Ammonia 1x/week (T) Grab
TKN 1x/week (T) Grab YES IRR-FOR (in Season)
Chloride 1x/week (T) Grab YES IRR-FOR (in Season)
34 #1..
- 157 -
Process Sampling
Required by Permit Comments
Grab or 24-hour
Process Area Frequency Composite
CanSeg
pH 1x/week (Tues) Grab YES In Season
TSS 1x/week (Tues) Grab YES In Season
ICP 1x/week (Tues) Grab YES In Season
Ammonia 1x/week (Tues) Grab YES In Season
TKN 1x/week (Tues) Grab YES In Season
Chloride 1x/week (Tues) Grab YES In Season
35 #1..
- 158 -
Process Sampling
Comments
Required by
Volume Typical range Permit
Grab & Time
(G) or 24-
hour
Composite
Process Area Frequency (Comp)
Ranch
36 #1..
- 159 -
SCADA Information – Slide Number and Title
700 Jennings Facility Overview
701 Ranch irrigation System
702 Jennings Weather Station
705 Control Building
707 Ranch/Cannery Segregation Pump Station Gates & Valves 708 Ranch/Cannery Segregation Pump Station
709 Irrigation Reservoir & Mix Box
DAF Process obsolete – not in use
750 DAF Raw Water Pump Station
751 DAF Air Flotation Thickeners 1 & 2
752 DAF Air Flotation Thickeners 3 & 4
753 DAF Thickener Drainage Pumping Station
754 DAFT Air Compressor & Alum System
755 DAF Equipment Run Times
37 #1..
- 160 -
Standard Operating Procedures
Title SOP ID
Fixed Film Reactors
Shift Procedures JEN FFR 1
Fixed Film Reactor In and Out of Service JEN FFR 2
FFR Feed Pump In or Out of Service and Control JEN FFR 3 System Reset and Check JEN FFR 4
Ponds
Shift Procedures JEN POND 1
Facultative Pond Inlet Pump In and Out of Service and Control JEN POND 2 Storage Pond Pumps In and Out of Service and Control JEN POND 3 Irrigation Forebay Pumps In and Out of Service and Control JEN POND 4 Storage Pond #2 Butterfly Valve Failure Response JEN POND 5 Low Storage Pond Volume Countermeasures JEN POND 5
Weather Station Inspection JEN POND 6
System Reset and Check JEN POND 7
38 Irrigation
Shift Procedures JEN R&I OPS 1
Coordination with End Users JEN IRR 1
Tailwater Pump In and Out of Service JEN IRR 2
Booster Pump In and Out of Service JEN IRR 3
Soil Sampling JEN IRR 4
Storage Pond Effluent Control Valve Usage JEN IRR 5
Tertiary Effluent Bypass JEN IRR 6
#1..
- 161 -
Standard Operating Procedures – John - REVIEW List
Title SOP ID
Tertiary Pump Station
Tertiary Effluent Pump In or Out of Service and Control JEN TERT 1 Utility Water Pump In or Out of Service and Control JEN TERT 2 Combined Effluent Composite Sampler In or Out of Service JEN TERT 3 HVAC Heat Exchanger??? JEN TERT 4
System Reset and Check JEN TERT 5
Effluent Pump Station
Shift Procedures JEN EPS 1
System Reset and Check JEN EPS 4
NVRRWP Pipeline Draining Procedure JEN EFF 1
Irrigation
Shift Procedures JEN R&I OPS 1
Coordination with End Users JEN POND 1
Tailwater Pump In and Out of Service JEN POND 2
Booster Pump In and Out of Service JEN POND 3
Soil Sampling JEN POND 4
Storage Pond Effluent Control Valve procedure ???
39 #1..
- 162 -
Operator II, I and Trainee Duties and Expectations
Duties
• Make Field Observations, such as: • Equipment status
• Instrument status
• Sampler status
• Safety conditions
• Surface elevations
• Confirm instrument and analyzer feedback and
calibrate as needed
• Review operational reports and SCADA trends daily
to keep up on process performance
• Take corrective actions as needed
• Initiate maintenance work orders when required to
correct equipment issues
• Perform housekeeping and maintenance tasks
Expectations
• Perform process and equipment condition assessments
and observations
• Conduct field measurements and tests as required
• Record field data
• Take corrective actions to re-establish operational targets • Take equipment in and out of service as needed
• Report to Plant Operations Supervisor on duty about
process conditions
• Report all irregularities to Plant Operations Supervisor on duty • Share field observations with fellow operators
• Complete daily maintenance tasks
• Fill out logbook; include date, full first name and last name initial, what equipment is in use, not in use, what changes were made, what was done in the area
Interior
40 #1..
- 163 -
Senior Plant Operator Duties and Expectations
Duties
• Correct unsafe working practices immediately • Work with the Operations Supervisor to minimize disruptions to daily wastewater processing while
achieving desired preventive and corrective
maintenance goals • Confirm less-experienced operators understand process goals and objectives
• Ensure control action is taken when needed to meet
process targets
• Support process operations coordination with
maintenance work
• Identify documentation needs and support changes
• Advise Operations Supervisor of all irregularities
• Support training needs and methods to develop a wellrounded Operations staff Expectations
• Make certain all workers – City or contractor - are
working safely
• Support Plant Operators while conducting their duties.

Provide guidance and refresher training as needed, • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other
treatment processes
• Monitor equipment setpoints to ensure units are
operating at target setpoints to achieve required
performance
• Ensure corrective action is taken when needed
• Provide equipment isolation and restart timing and
procedures
• Develop and maintain appropriate SOPs
• Evaluate control systems screens, trending, and data to optimize processes and operating costs
Interior
41 #1..
- 164 -
Plant Operations Supervisor Duties and Expectations
Duties
• Manage and supervise process operations • Follow up on Plant Operator’s completion of duties • Initiate adjustments as needed. Provide oversight for process adjustments to maintain permit compliance
• Provide guidance to achieve production and optimization goals while minimizing operating and maintenance costs
• Visually observe all process units a minimum of once/shift • Review operational reports and SCADA trends daily to keep up on process performance
• Ensure control action is taken when needed to meet
process targets
• Visually observe all process units a minimum of once/day • Coordinate maintenance work order response with process operations
• Discuss delays in or disruptions from maintenance work with Maintenance counterparts • Advise Operations Superintendent of all irregularities • Coordinate training activities and programs
Expectations
• Make certain all workers – City or contractor - are working safely
• Monitor plant operators while conducting their duties.

Provide guidance and refresher training as needed. • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other treatment processes
• Monitor equipment setpoints to ensure units are operating at target setpoints to achieve required performance
• Visually observe all process units a minimum of once/shift • Ensure corrective action is taken when needed • Provide equipment isolation and restart timing and
procedures
• Develop and provide contingency plans
• Develop and maintain appropriate SOPs
• Confirm control systems screens, trending, and data
consistently reflect field conditions
Interior
42 #1..
- 165 -
Operations Superintendent Duties and Expectations
Duties
• Determine compliance requirements • Direct optimization efforts • Work with the Maintenance Manager to minimize
disruptions to daily wastewater processing while
achieving desired preventive and corrective
maintenance goals • Establish process goals and objectives • Predict expected flows and loads • Track actual flows and loads and recommend optimization actions
• Establish boundary limits for contingency plan actions • Review process sampling needs and data reporting
requirements every six months
• Identify documentation needs and changes
• Direct control system quality and upgrades
• Establish training needs and methods for each tier of Operations staff
Expectations
• Make certain all workers – City or contractor - are
working safely
• Provide oversight to ensure Directives are met • Use analysis tools where appropriate to optimize daily operation and determine corrective response
actions
• Compare unit performance data to expectations,
then provide feedback to the Operations staff with
recommendations as needed
• Maintain e-based trending compliance and
performance measurements
• Maintain the online O&M Manual • Confirm Plant Operations Supervisors are making process control actions that align with desired results • Provide equipment isolation and restart timing and
procedures
• Guide development of contingency plans
• Guide development of appropriate SOPs
• Direct training and skills measurement
Interior
43 #1..
- 166 -
Version Date revised Version Approved
Version 1 June 2021
Jennings - Phase I
Area Management Plan
1 Exhibit D #1..
- 167 -
Table of Contents
Phase I processes include
• Primary Effluent Pumping
• Fine Screening
• Activated Sludge – Biological Nutrient Removal • Membrane Bioreactors • Ultraviolet Disinfection • Phase I Overview
• Discharge Permit Limits
• Process Definitions
• Design Criteria • Operational Strategy for each sub-system • Key Control Variable
• Process Overview and Inspection Rounds Criteria for each system
• Upstream and Downstream Impacts to the Phase I Processes • Process Operating Strategy
• Key Performance Indicators
• Phase I Awareness
• Process Sampling
• SCADA Information
• Standard Operating Procedures
• Critical Incident Notification
• Duties and Expectations
• Plant Operator II, I and Trainee
• Senior Plant Operator • Operations Supervisor • Operations Superintendent 2 #1..
- 168 -
Phase I Overview
Fine
Screens
Biological
Nutrient
Removal
(BNR)
WAS and
RAS
Pumping
Membrane
Bioreactors
UV
Disinfection
Electrical
Building
Phase I
Phase II • Primary Effluent
Pumping
• Fine screening
• Oxidation ditch
• Membrane
Bioreactors • Ultraviolet
disinfection
Interior • Fixed Film Reactors
• Ponds – Facultative
and Storage
• Irrigation – Forebay
and Reservoir • Can Seg Pump Station
• Ranch Outside
• Tertiary Pumping Station
• Effluent Pumping Station
• Canal
Primary
Effluent
Pumping
Station I
3 #1..
- 169 -
Treatment Systems Input and Outputs
4 #1..
- 170 -
Discharge Permit Limits

BE AWARE
Read the NPDES permit for more detailed information.

Know and understand how it governs our work.

OBJECTIVE
Zero permit violations achieved through process control adjustments, operator initiative and data awareness. 5 #1..
- 171 -
Process Definitions • Fine Screening: Fine screens are used to remove particles that may cause maintenance issues for process equipment and/or operational problems to the membrane bioreactor process. • Activated Sludge: The activated sludge process is a type of wastewater treatment process for treating sewage using aeration and a biological floc composed of bacteria and protozoa. • Oxidation Ditch: A complete-mix, activated sludge reactor designed to remove biodegradable organics (BOD), ammonia, and nitrogen from the process stream
• Biological Nitrogen Removal (BNR): Conventional nitrogen removal is performed in multiple stages in the activated sludge process. Wastewater ammonia (NH3
) is oxidized to nitrite (NO2) by autotrophic ammonia-oxidizing bacteria (AOB), and the nitrite is then oxidized to nitrate (NO3
) by nitrite oxidizing bacteria (NOB) under aerobic conditions. Nitrate is oxidized to nitrogen gas in anoxic (unaerated) conditions. • Membrane Bioreactor (MBR): A membrane bioreactor is the combination of a membrane microfiltration process with the biological wastewater treatment process, the activated sludge process. • Ultraviolet Disinfection: Ultraviolet germicidal irradiation (UVGI) is a disinfection method that uses shortwavelength ultraviolet (UV-C) light to kill or inactivate microorganisms by destroying nucleic acids and disrupting their DNA, leaving them unable to perform vital cellular functions. • Average Daily Flow (ADF): The actual average flow of sewage through the sewage treatment system in a 24-hour period, typically assumed to be 60% of the daily design flow. • Peak Daily Flow (PDF): The largest volume of flow anticipated to occur during a one-hour period, expressed as a daily or hourly average. • Solids Retention Time (SRT): The average length of time the activated sludge solids are in the aeration basins. • Hydraulic Residence Time (HRT): The average length of time that water remains in a process unit.

BE AWARE
Dangers of Phase I processes include raw sewage with potential of disease exposure, stairs, slippery surfaces, confined spaces, airborne vectors, equipment that automatically starts and stops, chemicals with low and high pH, and high voltage electricity.

Use PPE and safe working practices as required.
6 #1..
- 172 -
Design Criteria
Operational Strategy Individual
Capacity
Total Design
Capacity Sub-Process Units
Influent Screening
Operate one pump at 100% to meet Phase I design
flow. 2 3,600 gpm 1,800 gpm
Primary Effluent Pump
No. 1 and 2 (PMP111,112)
Fine screen 1 5 mgd 5 mgd Run the screen always.

Run the washer compactor always. 20 cubic feet per
hour
20 cubic feet
per hour Washer compactor 1
1 44 gpm 44 gpm Run the pump always. Spray water booster pump
Activated Sludge – Biological Nutrient Removal
The Ditch can treat up to 7.6 pounds/1,000 gallons/day
BOD loading.

Anoxic zones = 0.23 MG
Aerobic zones = 0.51 MG
Sidewall = 12 feet
Total = 0.74 MG
1 Oxidation Ditch
Too short of a residence time in the anoxic zone can
increase effluent nitrate and nitrite. Too short of an HRT in the aerobic (aerated) zone can increase ammonia and
BOD.

Hours 8.2 hours at 2.5 mgd Hydraulic Residence Time
(HRT)
The target SRT provides the lowest ammonia, nitrate,
nitrite, and BOD concentrations in the MBR feed, and is used to calculate wasting rates.

Days 10 Solids Retention Time
(SRT)
Operate both aerators to maintain DO residual at the
start of the anoxic zone. Aerators 2 100 hp
7 #1..
- 173 -
Design Criteria
Operational Strategy Individual
Design
Total Design
Capacity Sub-Process Units
Activated Sludge – Biological Nutrient Removal
Operate enough pumps to return mixed liquor and the entrained pollutants for additional treatment. One RAS pump flow equals 1.5 times the design flow, even more at lower influent flows. If needed, the RAS pumps can return 6 times the design influent flow.
2 13.0 mgd 6.25 mgd Mixed Liquor
pumps
Anoxic mixers 2 5 hp each Operate both always.

WAS pump 1 140 gpm = 0.2 MG Use the SRT calculation to set the run time (minutes per day).

Run as often as necessary to remove nuisance foam from Oxidation Ditch surface. Foam pump 1 140 gpm = 0.2 MG
RAS (the remaining volume that is not drawn through the membranes by the permeate pumps) flows from the membrane tanks by gravity through a 36-inch RAS pipeline and through six nozzles located in the aerobic zone that spread the RAS flow evenly in aerobic zone
Return
Activated
Sludge
• A manually operated gate located at the inlet of the anoxic zone separates the aerobic and anoxic zones and controls the fraction of aerated mixed liquor that enters the anoxic zone from the aerobic zone. • The inlet gate is positioned to allow an optimal mixed liquor flow rate from the aerobic zone to the anoxic zone. If the mixed liquor flow rate is too high, the DO level in the anoxic zone will be too high. If the entrained DO level is too high the microorganisms that convert nitrate to nitrogen gas will not provide denitrification. • If the mixed liquor flow rate is too low, the DO level will be low and denitrification will occur; however, less nitrate in the mixed liquor will be denitrified, so less nitrogen will be removed from the oxidation ditch. • To establish an optimal flow rate from the aerobic zone to the anoxic zone, DO measurements are taken five feet into the anoxic zone. If the measured DO level is zero, the gate should be positioned more open; however, not so open that the measured DO level is greater than zero. If the measured DO level is greater than zero, then the gate should be positioned more closed. 8 #1..
- 174 -
Design Criteria
Individual Design Operational Strategy Total Design
Capacity Sub-Process Units
Membrane Bioreactors
The average operating flux rate of each train is 11.9
gal/ft2
/day, with a maximum rate of 15.9 gal/ft2/day.

0.75 mgd 1d max

0.575 mgd ADF

3.0 mgd 1d max

2.3 mgd ADF 4 Membrane bioreactor
Operate to match the influent flow. This helps
maintain hydraulic balance in the activated sludge
process.

0.75 mgd 1d max

0.575 ADF

3.0 mgd 1d max

2.3 mgd ADF Permeate pump 4
The MBR PLC maintains the desired porosity of the

0.4-micron membrane fibers by scouring with air. 5 5,900 scfm 1,180 scfm MBR air scour blower Cleaning of MBR fibers with 0.4-micron openings is
periodically required to retain the desired
performance.
4 2.3 mgd 0.575 mgd Recovery Clean
pump
9 #1..
- 175 -
Design Criteria
Individual Design Operational Strategy
Total
Design
Capacity
Sub-Process Units
UV Disinfection
Operate enough to maintain UVT transmittance
required to achieve coliform permit criteria.

In-vessel reactors 3 6.3 2.3 mgd
Peak flow rate 2.3 mgd
Maintaining the target dose proves that the UV
system is operating at the required efficiency level to achieve the desired coliform inactivation.
mJ/cm --- 80 Dose 2
Transmittance (UVT) of 65% or greater is required to
achieve the desired coliform inactivation. Transmittance mW/cm2 --- 65 NOTE: • MBR and UV process equipment provide the best results with minimum variability in flow and pollutant loadings. • Phase I is designed as a system that is pumped into. • Optimizing Phase I influent pumping reduces variability. • In UV disinfection, 254 nanometer wavelength light from the lamps penetrates the cell wall of the microorganism. • The microorganism’s DNA and RNA structure is altered to prevent reproduction. • The microorganism is not destroyed, but without reproductive capacity cannot multiply and is considered dead.
10 #1..
- 176 -
Process Flow Diagram
11 #1..
- 177 -
Primary Effluent Pump Station
Inspection Rounds - Always confirm that the:

1. Dilution water pump station isolation gate is open. 4. PE Pumps have no unusual noises and vibration.

2. Wetwell isolation gate is open, unless offline for 5. VFD Controllers have no faults (at Electrical Building 1A). maintenance.

6. TP1 PE flow meter is providing data at SCADA. This data is used for permit compliance.

3. Wetwell Level Indicator is working. Record the level. 1 2
3 4
5 6
12 #1..
- 178 -
Phase I Influent Screening
Inspection Rounds - Always confirm that the:

1. Fine screen is rotating. 5. Chain oil pump reservoir is full.

2. Wash spray solenoids are operating properly. 6. Fine screen HMI has no alarms and faults.

3. Spray water pressure is in the operating range. 7. Screenings are reaching the washer/compactor.

4. Fine screen chain oil pump is not faulted. 8. Influent sampler is working, and the sampler jug volume is increasing.

9. Sampler refrigerator is at 6oC.
5 7
6 4 2 3
8 9
Compliance
Sampler Objective: Remove all debris greater than 1-
millimeter to prevent fouling of downstream
processes.
1 13
#1..
- 179 -
Phase I Influent Screening
Inspection Rounds - Always confirm that the:

1. Fine screen is rotating. 5. Chain oil pump reservoir is full.

2. Wash spray solenoids are operating properly. 6. Fine screen HMI has no alarms and faults.

3. Spray water pressure is in the operating range. 7. Screenings are reaching the washer/compactor.

4. Fine screen chain oil pump is not faulted.
5 7
6 4 2 3
Objective: Remove all debris greater than 1-millimeter to prevent fouling of downstream processes. 1 14
#1..
- 180 -
Washer / Compactor
Inspection Rounds - Always confirm that the:

1. Screenings are moving from the screens to the washer 4. Wash water is flowing to the machine. compactor.

2. Drive unit is turning. 5. Compacted screenings are filling the Screenings Bin.

3. Drain is not plugged, and area is clean from debris. 6. Full hoppers are swapped out. 1 2
3 4
5 6
Objective: Wash biomass
from screened debris and
prepare screenings for
landfilling.
15 #1..
- 181 -
Objective: Wash biomass
from screened debris and
prepare screenings for
landfilling.

Washer / Compactor
Inspection Rounds - Always confirm that the:

1. Screenings are moving from the screens to the washer 4. Wash water is flowing to the machine. compactor.

2. Drive unit is turning. 5. Compacted screenings are filling the Screenings Bin.

3. Drain is not plugged, and area is clean from debris. 6. Full hoppers are swapped out. 6 5
1 2
3 4
16 #1..
- 182 -
BNR – Overview
17 #1..
- 183 -
Inspection Points
18 2
1 3
4 5
6 7
8 9
10 11
12 15
17 16
13 14
19 20
18 #1..
- 184 -
Oxidation Ditch
Inspection Rounds - Always confirm that the:

1. Influent gate is open 100%. 11. WAS pump is operating.

2. North aerator/mixer is turning, and bearings are properly 12. WAS pit level is in control. lubricated.

13. WAS flow is in the expected operating range. Compare local readout to SCADA.

3. Anoxic mixers are running.

4. Foam and scum is moving across the water surface. 14. Spray water pressure is in the expected operating range.

15. South aerator/mixer is turning, and bearings are properly lubricated.

5. Foam/scum pump is operating, and the scum level is
changing.

16. Aerobic zone liquid surface is moving, foam is not too thick, and is a light brown color.

6. Spray water is working, and nozzles are not plugged.

17. RAS is being pumped from the MBRs to the Oxidation
Ditch.

7. DO analyzers are working and results are in the expected operating range.

18. Trash and weeds are removed from the surface before they plug something up.

8. Nitrate analyzer is working, and results are in the expected operating range.

19. Influent sampler is working, and the sampler jug volume is increasing.

9. Mixer liquor pumps are working, and the level is in control.

20. Sampler refrigerator is at 6o

10. Mixed liquor is flowing within the expected operating C. range. Compare local readout to SCADA.
19 #1..
- 185 -
Membrane Bioreactor – Overview
Objective: Separate the MLSS from effluent compliant treated wastewater.

Chemicals
transferred
from Phase II
20 #1..
- 186 -
Inspection Points - 1
17 10
4 5
6 7 8
9 13 14 15
11 1
2 3
16 12
21 #1..
- 187 -
Inspection Points - 1
Inspection Rounds - Always confirm that the:

9. Suction valves to and discharge valves from the permeate pumps are open.

1. Plant water pressure is above 70 psig.

10. Suction pressure of each permeate pump in use are in the expected operating range.

2. Plant air system pressures are within operating range.

3. Air scour distribution in the MBR tanks is even. 11. Oil Levels on each permeate pump. Report any oil leaks

12. Check the turbidimeters for proper operation, with flow through each Turbidity Meter 250-750 mL/min.

4. Influent valves that allow mixed liquor to flow into an MBR are 100% open for the units in use.

5. Drain valves that allow for MBR cleaning are closed for the 13. MBR operational screens show no alarms. units in use, unless in a cleaning cycle.

6. Isolation valves that allows RAS to flow to the Oxidation 14. Check air flow to each MBR Tank. (HMI) Ditch are open 100%,

7. Pneumatic eductors and actuators on membrane 15. MBR control panel controls are in AUTO. permeate manifolds do not have excessive heat and/or are cycling too frequently.

16. Maintenance Cleans occur as scheduled with the LEAP system.

8. Air scour manifold couplers are not leaking by listening for air leaks.
22 #1..
- 188 -
Inspection Rounds - Always confirm that the:

24. Citric acid tank level is
adequate to meet cleaning
demands (confirm transfer from
Phase II storage).

20. Backpulse tank (permeate
storage) level is adequate to meet
demands and is not overflowing.

25. SC200 Controllers have no
faults or warnings.

21. Backpulse tank has no leaks or
cracks.

26. CL17 reagent levels are enough.

Replace as needed.

22. Plant drain valve is closed.

23. Hypo tank level is adequate to
meet cleaning demands (confirm
transfer from Phase II storage).

Inspection Points - 2
25 26
24 23
22 21 20
23 #1..
- 189 -
MBR – Air Scour Blowers
Inspection Rounds - Always confirm that the:

1. Air scour blower controls are in AUTO and there are no 3. Oil levels are in operating range. Report any oil leaks, local alarms. Confirm and record lead blower.

4. Filter differential pressure is within operational range. Blower intake filters are free of dust and visible dirt. Clean up as needed.

2. Blower header discharge pressure setpoint is correct.

Record it.

BE AWARE
ALWAYS wear hearing protection when working in this area.

Surge conditions may occur.

Objective: Forced air to remove loosely attached solids that foul the membrane’s filtration pores. 1 1
2 2
3 3
4 4
24 #1..
- 190 -
MBR – Chemical Cleaning System
Inspection Rounds - Always confirm that the:

Pumps are not leaking. If a leak is found, contact the Spill containment area and drain sump are free of debris. supervisor on duty immediately to start corrective actions.

Fittings are not leaking. If a leak is found, contact the Eye wash, shower and alarms are working. supervisor on duty immediately to start corrective actions.

Valving is in the correct alignment.

Objective: Periodically dissolve contaminants off the MBR fibers to maintain desired performance.

Citric Acid Sodium Hypochlorite
3 = Short exposure could cause serious temporary or
moderate residual injury
1 = Normally stable, but can become unstable at
elevated temperatures and pressures

BE AWARE
ALWAYS wear PPE when working in this area.

Phosphoric Acid
25 #1..
- 191 -
MBR – Phase II to Phase I Sodium Hypochlorite Transfer
Inspection Rounds - Always confirm that the:

1. Pump is not leaking. If a leak is found, contact the supervisor 3. Valving is in the correct alignment. on duty immediately to start corrective actions.

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

2. Fittings are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

Objective: Supply Phase II bulk hypo to satellite storage areas in Phase I.

BE AWARE
ALWAYS wear PPE when working in this area.
26 #1..
- 192 -
MBR – Phase II to Phase I Citric Acid Transfer
Inspection Rounds - Always confirm that the:

1. Pump is not leaking. If a leak is found, contact the supervisor 3. Valving is in the correct alignment. on duty immediately to start corrective actions.

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

2. Fittings are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

Objective: Supply Phase II bulk citric acid to satellite storage areas in Phase I.

BE AWARE
ALWAYS wear PPE when working in this area.
4 2 3
1 4
3 27
#1..
- 193 -
Ultraviolet Disinfection
Inspection Rounds - Always confirm that the:

5. Effluent analyzers for DO, pH, and turbidity are working.

Calibrate each as required by the manufacturer.

1. UV control panel controls are in AUTO. Check all SC200 Controllers and the Master Control screen for faults or warnings.

6. Automated discharge valves are in AUTO to immediately divert non-compliant effluent.

2. UV transmittance and UV dosage are above the minimum permit-required operational targets.

7. Phase I effluent sampler is working, and the volume in the sample jug is increasing.

3. Wiper system for hydraulic fluid leaks.

8. Sampler refrigerator is at the correct temperature of 6o

4. Air pressure at Diversion Valves is greater than 75 psig. C.

Compliance
7 8 Sampler
4 5 6
3 2
1 5 6
28 BE AWARE
Inspect bulb hours for all
vessels. If ANY bulb has
11,800 hours of run, submit
work order for bulb
replacement and notify
supervisor.
#1..
- 194 -
Impacts to the Phase I Processes
Influence Concerns Location to
Process
Hydraulic retention time can affect BOD removal. Higher effluent BOD creates a larger load on Jennings. Sutter primary clarification Upstream
Warmer temperatures can increase the portion of BOD that is soluble. Soluble BOD (sBOD) is consumed first by the denitrifying organisms. Warmer effluent can result in more efficient nitrate removal.

Primary clarifier effluent
(Phase I influent)
temperature
Transit time, combined with warmer temperature, allows more biological action in the sewer, which can create septicity and reduce the amount of sBOD and increase the mass of filamentous organisms.

Sewage flow retention time
from Sutter to Jennings
Water returned from the facultative ponds is necessary to limit nutrient loading from high strength primary effluent. Phase I is designed to treat a maximum BOD load of 400 mg/L.

Make-up (dilution) water
flow and quality
Maintain a consistent flow rate through Phase I reduces variability, which improves MBR and UV performance.

Primary effluent/dilution
water pumping rate
Outside influences could negatively affect the BNR or UV processes. For example, tannins and lignins may negatively affect the UV transmittance.

Air or waterborne
insecticides or herbicides
In-plant drains Chemical or fuel spills could disrupt the BNR process.

Downstream
The Effluent Pump Station pumps tertiary effluent to the Delta-Mendota Canal. Minimum flow through the pump station is 3.6 mgd. Flow lower than this will cause the pumps to operate off the pump’s curve and cause unwanted starts and stops.

Effluent Pump Station (EPS)
29 #1..
- 195 -
BNR Awareness
30 #1..
- 196 -
Process Operations Strategy - BNR
Variable What it controls Why use the strategy Where is it implemented Evaluating the TSS, BOD and
ammonia removal efficiencies
against the solids inventory.

Ensure adequate solids inventory
is positioned to remove these
pollutants with the appropriate
number of basins in service.

The hydraulic, TSS, BOD
and ammonia loading to
aeration basins.

Screened influent
flow
Wasting of solids inventory based
on mixed liquor density and the
effluent criteria.

Achieve performance that meets
discharge permit requirements
100% of the time.

TSS, BOD and ammonia
reduction.

Solids Retention
Time (SRT)
Solids inventory is calculated using
the MLSS density times the entire
oxidation ditch volume (unlike
Phase II).

Optimize the mass of solids that
requires aeration.

The effectiveness of the
activated sludge process to
remove TSS, BOD and
ammonia.

Solids inventory
31 #1..
- 197 -
Process Operations Strategy - MBR
Variable What it controls Why use the strategy Where is it implemented Evaluating the influent data and
output from each subsequent
treatment process.

Optimum performance with
lowest operating and
maintenance costs.

The number of individual unit
components used to treat the
sewage.

Operate appropriate
number of MBR units
MBR control panel.

Maintain the porosity and
effectiveness of the individual
membranes.

Solids accumulation on the
membrane. The air scour
system introduces airflow at the
bottom of each membrane
cassette. Turbulence created by
the airflow scours accumulated
solids from the surface of the
membrane fibers.

MBR air scour
MBR control panel.

To achieve the required
performance of the system longterm.

Effectiveness of the membrane
fibers for straining away
entrained pollutants.

Maintenance cleaning
phosphoric acid.
32 #1..
- 198 -
Process Operations Strategy - UV
Variable What it controls Why use the strategy Where is it implemented Follow the Standard Operating
Procedure
A proactive seasonal strategy is
used to achieve permit
compliance.

The effectiveness of the UVT. Entrained tannin and
lignin in the MBR effluent
Online analyzers that track: • UV transmittance (UVT) • UV dose (mJ/cm2 )
Maintain permit compliance.

Out-of-range UV performance
automatically initiates a change
of discharge location from the
effluent pump station to the
non-compliance facultative
pond.

Discharge to the tertiary
effluent pump station or to the
non-compliance facultative
pond that receives noncompliant effluent.

UV system turbidity
analyzer outputs
Online analyzers that track: • Dissolved oxygen (mg/L) • pH (standard units) • Turbidity (NTU) Maintain permit compliance.

Out-of-range results
automatically initiate a change
of discharge location from the
effluent pump station to the
non-compliance facultative
pond.

Discharge to the tertiary
effluent pump station or to the
non-compliance facultative
pond that receives noncompliant effluent.

Effluent analyzer outputs

BE AWARE
Confirm automatic change from out-of-range results
33 #1..
- 199 -
Key Performance Parameter - SRT
Total SRT = Volume of Bioreactor as MG x MLSS, mg/L x 8.34 lb/gal _____________________________________________________ (Waste Flow, MG x TSS, mg/L x 8.34 lb/gal) + (Eff TSS, mg/L x Eff Flow, mgd x 8.34 lb/gal) Mass (pounds) in the process
Mass (pounds) lost
The ideal solids inventory achieves the lowest ammonia concentrations in the effluent at the lowest mixed liquor density.

BE AWARE
Don’t get hung up on MLSS or RAS density as it is the solids inventory mass (pounds) that is providing the results. Compare the mass to the process outputs (effluent ammonia, nitrate, nitrite, phosphorus) and waste excess solids to adjust the results as needed.

NOTE
Total SRT is the calculation used to set the solids inventory for Phase I. For Phase II, aerobic SRT is used to set the solids inventory mass.
34 #1..
- 200 -
Key Performance Indicators - BNR
Purpose Operating
Range Variable Location Units
Entrained oxygen poisons conversion of nitrate to
nitrogen gas. Dissolved Oxygen Anoxic zone mg/L <1.0
(DO) End of Aerated zone mg/L 2.0-3.0 Meet BOD and ammonia conversion demands.

Maintain adequate solids inventory to complete
ammonia conversion. mg/L 5000-8000 Mixed liquor at end of Aerated zone Total Suspended
Solids (TSS) Maintain SRT target in days – sum of all.

WAS mg/L 7000-8000
Total WAS and Foam mg/L x - y
RAS mg/L x - y Sustain BNR process.

Note: RAS is pumped from the MBR to the Oxidation Ditch.

Mixed Liquor Flow MGD 3 x Q Transfer contents to MBR for processing.

Summed values to maintain target SRT.

WAS Flow gpm 35-120
WAS & Foam Flow gpm x - y
The ideal solids inventory achieves the lowest ammonia
concentrations in the effluent at the lowest mixed liquor density. Mixed liquor density is a product of the
calculation, not the target parameter.

Calculation days 10-13 Solids Retention
Time (SRT)
Solids Inventory Calculation lbs 43,700-50,000 Result of the SRT calculation.

Track nitrification performance. About 7.5 pounds of
alkalinity is consumed for every pound of ammonia
treated in BNR.
x - y mg/L
and
lb/day
Alkalinity Primary effluent
Track nitrification performance. About 3 pounds of
alkalinity is returned by the conversion of nitrate to
nitrogen gas.
x - y
mg/L
and
lb/day
Alkalinity End of Anoxic zone
Track nitrification performance. Use to adjust wasting, therefore MLSS density. Nitrate and Nitrite Analyzer mg/L x - y 35 #1..
- 201 -
Key Performance Indicators - MBR
Purpose Operating
Range Variable Location Units
Flow per unit Each cell gpm 300-400 Match operation to influent flow.

Track unit performance required to achieve permit
compliance. NTU 0.017-0.20
1 each (process) and
1 common
(compliance)
Turbidity
TMP = feed pressure – permeate pressure. Can indicate
excessive fouling or fiber failure. Each cell psig -1.1-0.8 Transmembrane pressure (TMP)
Track production rate. Can indicate excessive fouling or fiber failure. As MLSS density increases the flux rate
decreases.

Flux Each cell gal/sf/min 9.5
The permeability of a membrane is the flux rate divided by the transmembrane pressure. Permeability Each cell gal/sf/d 17-21 The viscosity of water increases as water temperature
decreases. Permeability and flux rate decrease in colder temperatures.
12-20o Temperature Influent degrees C
Key Performance Indicators - UV
Variable Location Units Operating Range Purpose
Influent flow Head of process GPM 530-700 Plan vessel reactor outages for maintenance.

The percentage of light that passes through a water
sample at the wavelength of 254 nm. Less percentage
equals more turbid water or other interference.

UV transmittance UV control panel % 68-75
An increase in dosage for a comparable flow may
indicate lamp fouling. Dosage UV control panel mj/cm2 80-200 UV intensity UV control panel mW/cm2 6.0-7.0 Note: this is measured as % at Phase II.

Bulb run time UV control panel hours Do not exceed 12,000 Write a work order no later than 11,800 hours.

More reactors for the same flow may indicate a loss of
efficiency or less effective MBR treatment upstream. Reactors in service Track 2-3 36 #1..
- 202 -
Key Performance Indicators - Effluent
Variable Measurement Units Do Not Exceed
pH Instantaneous minimum su 6.5
pH Instantaneous maximum su 8.5
Daily maximum mg/L 20
Biochemical Oxygen Demand 5-day at
20oC
Daily maximum lbs/day 2,500
Weekly average mg/L 15
Weekly average lbs/day 1,900
Monthly average mg/L 10
Monthly average lbs/day 1,200
Daily maximum mg/L 20
Total Suspended Solids
Daily maximum lbs/day 2,500
Weekly average mg/L 15
Weekly average lbs/day 1,900
Monthly average mg/L 10
Monthly average lbs/day 1,200
Weekly average mg/L 1.5
Ammonia – April 1 to Sep 30 Weekly average lbs/day 190
Monthly average mg/L 0.85
Monthly average lbs/day 100
Weekly average mg/L 2.8
Ammonia – Oct 1 to Mar 31 Weekly average lbs/day 350
Monthly average mg/L 1.6
Monthly average lbs/day 200
Nitrate plus Nitrite Weekly average mg/L 19
Nitrate plus Nitrite Monthly average mg/L 10
Note: Pounds per day is calculated as Flow in MG x mg/L x 8.34 lbs/gal 37 #1..
- 203 -
Phase I Awareness
Criteria Units Why Tracked Actions
Confirm Phase I Adjust as needed to meet design flow rate operability is
maximized
Actual Flow / Design Flow %
Add or subtract dilution water based on Sutter
effluent qualities
Evaluate Phase I
influent conditions
Alkalinity Load / Ammonia Load Ratio
Increase or decrease wasting to meet target, basing
adjustments on effluent nitrogen compounds
Optimize BNR
process
Difference between Target SRT and %
Actual SRT
Increase or decrease waste pump run time to
compensate for over- or under-pumping
Confirm wasting is
operated as desired
Difference between Waste and Waste Pounds
Target
Evaluate effects of actual SRT, alkalinity, RAS flow,
mixed liquor overflow, water temperature, and
dilution water flow rate
Confirm BNR
effectiveness
Effluent ammonia mg/L
Evaluate effects of actual SRT, alkalinity, RAS flow,
mixed liquor overflow, water temperature, and
dilution water flow rate
Confirm BNR
effectiveness
Effluent nitrate mg/L
Monitor MBR Evaluate chemical cleaning frequency
conditions
Difference between daily average %
membrane permeability and Design
MAX
Monitor MBR Evaluate membrane cassette replacement
conditions
Difference between post-recovery %
permeability and Design MAX
Monitor MBR Evaluate NTU analyzer performance
effectiveness
Difference between NTU MAX and %
Actual NTU
Monitor MBR Evaluate MBR fiber integrity
effectiveness
Difference between daily average NTU %
and Design NTU
Evaluate UV operating strategy, MBR effectiveness,
and effluent qualities
Monitor UV
effectiveness
Difference between actual UV %
Transmittance and MIN allowed
38 #1..
- 204 -
Process Sampling
Comments Required by
Permit Typical range
Grab & Time
(G) or 24-hour
Composite
(Comp)
Process Area Frequency
Phase I Influent
Influent Q, MGD Daily ---- 1.7-2.3 NO Flow meter
Composite Sampler, flow paced
BOD, mg/L Daily Comp 122 – 380 NO
TSS, mg/L Daily Comp 51 – 176 NO
COD, mg/L M, W, F Comp 276 – 752 NO
Alkalinity, mg/L M, T, W, Th, F Comp 231 - 377 NO
Phase I Oxidation Ditch
MLSS, mg/L M, T, W, Th, F Grab 3,800 – 9,400 NO
MLVSS, mg/L M, T, W, Th, F Grab 3,325 – 8,200 NO
RAS, TSS, mg/L Daily Grab NO
WAS, TSS, mg/L Daily Grab 3,670 – 17,000 NO Continuous read to SCADA DO, mg/L Daily 2.5-3.0
Phase I Permeate
Turbidity, NTU Daily ---- 0.017-0.20 YES Online meter
Daily ---- 65-90 YES Online meter UV Transmittance,
mW/cm2
Flow, gpm Daily ---- 1,200-1,600 NO Flow meter
39 #1..
- 205 -
Process Sampling
Comments Required by
Permit Typical range
Grab & Time
(G) or 24-
hour
Composite
(Comp)
Process Area Frequency
Phase I Disinfection/Final Effluent
UV Intensity, mW/cm2 Daily Comp 6.0 YES Online Meter
UV Dosage, mJ/cm2 Daily Comp 80-200 YES Calculated
pH, SU Daily Comp 6.8-7.2 YES Online Meter
Flow, gpm Daily Comp 1,600 YES Flow Meter
BOD, mg/L Daily Comp <2 - 4 NO Composite Sampler, flow paced TSS, mg/L Daily Comp <3 NO Composite Sampler, flow paced NO3 as N, mg/L Monthly Comp 0.23 – 9.1 NO Composite Sampler, flow paced Alkalinity, mg/L M, T, W, Th, F Grab 170-290 NO
Total Coli, MPN/100ml Daily Grab <1.8 – 2.0 YES
Methyl Mercury, ug/L Monthly Grab ND NO
Total Mercury, ng/L Monthly Grab 0.32 – 1.32 NO
Selenium, ug/L Monthly Grab <0.28 – 1.5 NO
Ammonia, mg/L Weekly Grab <0.03 – 2.0 NO
DO, mg/L Weekly Grab 0.8 – 8.59 NO Handheld Meter
Temp Weekly Grab 16.2 – 28.5 NO Online meter: "Grab" reading from wall COND, umhos/cm Weekly Grab 730 – 1,200 NO
Chlorpyrifos, ug/L Annually Grab ND NO
Diazinon, ug/L Annually Grab ND NO
40 #1..
- 206 -
SCADA Information – Slide Number and Title
800 Tertiary System Overview 811 Membrane System #3 822 Plant Sump Pump System 801 Instrument Limits Alarm Setpoints 812 Membrane System #4 823 Primary Effluent Pump Controls 824 Foam Pump Controls Membrane System Backpulse
Tank 802 Tertiary Communications Overview 813
803 Primary Effluent Pump Station 814 Chemical Feed System 825 Mixed Liquor Controls 804 Fine Screen and Compactor 815 UV System Overview 826 Sample Station 816 UV System #1 827 Booster Spray Pump Controls Oxidation Ditch and Foam Pump Station 805
817 UV System #2 828 Plant Sump Pump Controls Mixed Liquor and Was Pump Station 806
Oxidation Ditch Mixer and Aerator
Controls 818 UV System #3 829 Zenon (Suez) Membrane System Overview 807 819 Effluent Diversion Valves 830 Was Pump Controls Tertiary Membrane System Setpoints Overview 808
809 Membrane System #1 820 Booster Spray Water System 834 PLC-JT1 Local I/O Chassis 810 Membrane System #2 821 Compressed Air System 835 Plant Help 41 #1..
- 207 -
Standard Operating Procedures
Title SOP ID
Phase I Plant
JEN TP1 OPS 1
Shift Procedures
Plant Startup JEN TP1 OPS 2
Plant Shutdown JEN TP1 OPS 3
JEN TP1 OPS 4
System Reset and Check
Primary Effluent Pump Station
Primary Effluent Pump In or Out of Service and Control JEN PEP TP1 1 Drain System In or Out of Service JEN PEP TP1 2
System Reset and Check JEN PEP TP1 3
Screening and Compacting
Fine Screen In or Out of Service JEN SCR TP1 1
Screenings Washer/Compactor In or Out of Service JEN SCR TP1 2 Screenings Handling (Removal) JEN SCR TP1 3
Influent Sampler Inspection JEN SCR TP1 4
42 #1..
- 208 -
Standard Operating Procedures
Title SOP ID
Oxidation Ditch
Aerator In or Out of Service JEN OX 1
Drain System Operation JEN OX 2
Mixed Liquor Pump In or Out of Service and Control JEN OX 3 Mixed Liquor Wetwell Level Indicator In or Out of Service JEN OX 4 WAS Pump In or Out of Service and Control JEN OX 5
DO Analyzer Verification and Calibration JEN OX 6
Recognizing and Response to Analyzer Failure JEN OX 7
Anoxic Mixer In or Out of Service JEN OX 8
Foam Pump In or Out of Service and Control JEN OX 9
Drain System In or Out of Service JEN OX 10
System Reset and Check JEN OX 11
43 #1..
- 209 -
Standard Operating Procedures
Title SOP ID
Membrane Bioreactors
MBR Tank In or Out of Service and Control JEN MBR TP1 1 Air Scour Blower In or Out of Service and Control JEN MBR TP1 2 Permeate Tank In or Out of Service and Control JEN MBR TP1 3 Permeate Pump In or Out of Service and Control JEN MBR TP1 4 Maintenance Clean-in-Place Operation and Control JEN MBR TP1 5 System Reset and Check JEN MBR TP1 6
UV System
UV Vessel In or Out of Service JEN UV TP1 1
UV System In or Out of Service and Control JEN UV TP1 2 UV Lamp Module In or Out of Service JEN UV TP1 3
UV Module Cleaning Procedures JEN UV TP1 4
Effluent Sampler Inspection JEN UV TP1 5
Turbidimeter In or Out of Service and Maintenance JEN UV TP1 6 UV Transmittance Meter In or Out of Service and Maintenance JEN UV TP1 7 System Reset and Check JEN UV TP1 8
44 #1..
- 210 -
Standard Operating Procedures
Title SOP ID
Chemical Handling
Chemical Storage Inspection JEN CHEM TP1 1
Chemical Receiving JEN CHEM TP1 2
Chemical Spill Response JEN CHEM TP1 3
Chemical Containment Cleanup JEN CHEM TP1 4
Citric Acid Pump In or Out of Service JEN CHEM TP1 5
Citric Acid Pump Control JEN CHEM TP1 6
Citric Acid Storage Tank In or Out of Service JEN CHEM TP1 7 Citric Acid Storage Tank Cleaning JEN CHEM TP1 8
Sodium Hypochlorite Pump In or Out of Service JEN CHEM TP1 9 Sodium Hypochlorite Pump Control JEN CHEM TP1 10
Sodium Hypochlorite Storage Tank In or Out of Service JEN CHEM TP1 11 Sodium Hypochlorite Storage Tank Cleaning JEN CHEM TP1 12 Phosphoric Acid Pump In or Out of Service JEN CHEM TP1 13 Phosphoric Acid Pump Control JEN CHEM TP1 14
Phosphoric Acid Storage Tank In or Out of Service JEN CHEM TP1 15 Phosphoric Acid Storage Tank Cleaning JEN CHEM TP1 16
System Reset and Check JEN CHEM TP1 17
45 #1..
- 211 -
Standard Operating Procedures
Title SOP ID
Auxiliary Systems
3WC Cl 17 Maintenance JEN UTL 6
Air Compressors Operation and Control JEN UTL 9
Hydropneumatic Tank Operation and Control JEN UTL 10
Plant Drain Pumps In and Out of Service JEN UTL 11
3W System In and Out of Service and Control JEN UTL 12
HVAC Skid Operation and Control JEN UTL 13
46 #1..
- 212 -
Operator II, I and Trainee Duties and Expectations
Duties
• Make Field Observations, such as: • Equipment status
• Instrument status
• Sampler status
• Safety conditions
• Confirm instrument and analyzer feedback and
calibrate as needed
• Review operational reports and SCADA trends daily
to keep up on process performance
• Take corrective actions as needed
• Initiate maintenance work orders when required to
correct equipment issues
• Perform housekeeping and maintenance tasks
• Make log entries
• Collect samples
Expectations
• Perform process and equipment condition assessments
and observations
• Conduct field measurements and tests as required
• Record field data
• Take corrective actions to re-establish operational targets • Take equipment in and out of service as needed
• Always follow Lock Out/Tag Out procedures
• Report to Senior Operator or higher on duty about
process conditions
• Report all irregularities to Senior Operator or higher on duty • Share field observations with fellow operators
• Complete daily maintenance tasks
• Fill out electronic logbook; include date, full first name and last name initial, what equipment is in use, not in use, what changes were made, what was done in the
area. Note actions taken for critical alarms.

Phase I
47 #1..
- 213 -
Senior Plant Operator Duties and Expectations
Duties
• Correct unsafe working practices immediately • Work with the Operations Supervisor to minimize disruptions to daily wastewater processing while achieving desired preventive and corrective maintenance goals • Confirm less-experienced operators understand process goals and objectives
• Ensure control action is taken when needed to meet
process targets
• Support process operations coordination with maintenance work
• Identify documentation needs and support changes
• Advise Operations Supervisor of all irregularities
• Support training needs and methods to develop a wellrounded Operations staff • Enter observations, review operator entries and submit entire log at the end of shift • Give turnover to the next shift Expectations
• Make certain all workers – City or contractor - are working safely
• Support Plant Operators while conducting their duties.

Provide guidance and refresher training as needed, • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other treatment processes
• Monitor equipment setpoints to ensure units are operating at target setpoints to achieve required performance
• Ensure corrective action is taken when needed
• Provide equipment isolation and restart timing and
procedures
• Always follow Lock Out/Tag Out procedures
• Develop and maintain appropriate SOPs
• Evaluate control systems screens, trending, and data to optimize processes and operating costs
Phase I
48 #1..
- 214 -
Plant Operations Supervisor Duties and Expectations
Duties
• Manage and supervise process operations • Follow up on Plant Operator’s completion of duties • Initiate adjustments as needed. Provide oversight for process adjustments to maintain permit compliance
• Provide guidance to achieve production and optimization goals while minimizing operating and maintenance costs
• Visually observe all process units a minimum of once/shift • Review operational reports and SCADA trends daily to keep up on process performance
• Ensure control action is taken when needed to meet process targets
• Visually observe all process units a minimum of once per day • Review work order backlog and adjust work efforts as required • Discuss delays in or disruptions from maintenance work with Maintenance counterparts • Advise Operations Superintendent of all irregularities • Coordinate training activities and programs
• Evaluate operator performance
Expectations
• Make certain all workers – City or contractor - are working safely
• Monitor plant operators while conducting their duties.

Provide guidance and refresher training as needed. • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other treatment processes
• Monitor equipment setpoints to ensure units are operating at target setpoints to achieve required performance
• Ensure corrective action is taken when needed
• Provide equipment isolation and restart timing and
procedures
• Always follow Lock Out/Tag Out procedures
• Develop and provide contingency plans
• Develop and maintain appropriate SOPs
• Confirm control systems screens, trending, and data
consistently reflect field conditions
Phase I
49 #1..
- 215 -
WQC Superintendent Duties and Expectations
Duties
• Determine compliance requirements • Direct optimization efforts • Work with the Maintenance Superintendent to minimize
disruptions to daily wastewater processing while achieving desired preventive and corrective maintenance goals • Establish process goals and objectives • Predict expected flows and loads • Track actual flows and loads and recommend optimization actions
• Establish boundary limits for contingency plan actions • Review process sampling needs and data reporting
requirements every six months
• Identify documentation needs and changes
• Direct control system quality and upgrades
• Establish training needs and methods for each tier of Operations staff
Expectations
• Make certain all workers – City or contractor - are working safely
• Provide oversight to ensure Directives are met • Use analysis tools where appropriate to optimize daily operation and determine corrective response actions
• Compare unit performance data to expectations, then
provide feedback to the Operations staff with
recommendations as needed
• Maintain e-based trending compliance and performance
measurements
• Maintain the online O&M Manual • Confirm Plant Operations Supervisors are making process control actions that align with desired results
• Provide equipment isolation and restart timing and
procedures
• Confirm that the Lock Out/Tag Out policy is enforced
• Guide development of contingency plans
• Guide development of appropriate SOPs
• Direct training and skills measurement
Phase I
50 #1..
- 216 -
Jennings - Phase II
Area Management Plan
1 Version Date revised Version Approved
Version 1 June 2021
Exhibit E
#1..
- 217 -
Table of Contents
Phase II processes include
• Primary Effluent Pumping
• Fine Screening
• Activated Sludge – Biological Nutrient Removal • Membrane Bioreactors • Ultraviolet Disinfection • Phase II Overview
• Discharge Permit Limits
• Process Definitions
• Design Criteria • Operational Strategy for each sub-system • Key Control Variable
• Process Overview and Inspection Rounds
Criteria for each system
• Upstream and Downstream Impacts to
the Phase II Processes
• Process Operating Strategy
• Key Performance Indicators
• Phase II Awareness
• Process Sampling
• SCADA Information
• Standard Operating Procedures
• Critical Incident Notification
• Duties and Expectations
• Plant Operator II, I and Trainee
• Senior Plant Operator • Operations Supervisor • Operations Superintendent 2 #1..
- 218 -
Phase II Overview
Fine
Screens
Biological
Nutrient
Removal
(BNR)
Aeration
Blowers
RAS
Pumping
WAS
Pumping
Membrane
Bioreactors
UV
Disinfection
Electrical
Building
Phase II
Phase I • Primary Effluent Pumping
• Fine screening
• Oxidation ditch
• Membrane Bioreactors • Ultraviolet disinfection
Interior • Fixed Film Reactors
• Ponds – Facultative and Storage
• Irrigation – Forebay and
Reservoir • Pumping Station #2 (Can Seg) • Canal
Outside
• Tertiary Pump Station
• Effluent Pump Station
Primary
Effluent
Pumping
Station 2
Air Scour
Blowers
3 #1..
- 219 -
Treatment Systems Input and Outputs
4 #1..
- 220 -
Discharge Permit Limits

BE AWARE
Read the NPDES permit for more detailed information.

Know and understand how it governs our work.

OBJECTIVE
Zero permit violations achieved through process control adjustments, operator initiative and data awareness. 5 #1..
- 221 -
Process Definitions • Fine Screening: Fine screens are used to remove particles that may cause maintenance issues for process equipment and/or operational problems to the membrane bioreactor process. • Activated Sludge: The activated sludge process is a type of wastewater treatment process for treating sewage using aeration and a biological floc composed of bacteria and protozoa. • Biological Nitrogen Removal (BNR): Conventional nitrogen removal is performed in multiple stages in the activated sludge process. Wastewater ammonia (NH3
) is oxidized to nitrite (NO2) by autotrophic ammonia-oxidizing bacteria (AOB), and the nitrite is then oxidized to nitrate (NO3
) by nitrite oxidizing bacteria (NOB) under aerobic conditions. Nitrate is oxidized to nitrogen gas in anoxic (unaerated) conditions. • Membrane Bioreactor (MBR): A membrane bioreactor is the combination of a membrane microfiltration process with the biological wastewater treatment process, the activated sludge process. • Ultraviolet Disinfection: Ultraviolet germicidal irradiation (UVGI) is a disinfection method that uses shortwavelength ultraviolet (UV-C) light to kill or inactivate microorganisms by destroying nucleic acids and disrupting their DNA, leaving them unable to perform vital cellular functions. • Average Daily Flow (ADF): The actual average flow of sewage through the sewage treatment system in a 24-hour period, typically assumed to be 60% of the daily design flow. • Peak Daily Flow (PDF): The largest volume of flow anticipated to occur during a one-hour period, expressed as a daily or hourly average. • Solids Retention Time (SRT): The average time the activated sludge solids are in the aeration basins. • Aerobic Solids Retention Time (aSRT): The length of amount of time, calculated in days, that solids or bacteria are under aeration. • Hydraulic Residence Time (HRT): The average length of time that water remains in a process unit.

BE AWARE
Dangers of Phase II processes include raw sewage with potential of disease exposure, stairs, slippery surfaces, confined spaces, airborne vectors, equipment that automatically starts and stops, chemicals with low and high pH, and high voltage electricity.

Use PPE and safe working practices as required.
6 #1..
- 222 -
Design Criteria
Individual Capacity Operational Strategy Total Design
Capacity Sub-Process Units
Influent Screening
Run two screens if the influent flow is greater than 6.3 MGD to reduce wear and operating costs. Fine screen 3 18.9 mgd 6.3 mgd 20 cubic feet per hour Run one washer compactor per fine screen in use. 60 cubic feet per hour Washer compactor 3
Spray water booster pump 3 204 gpm 68 gpm Run enough pumps to meet desired cleaning demand.

Operate two of three minimum to maintain a safe
working area. Foul air fan 3 21,000 scfm 7,000 scfm
Activated Sludge – Biological Nutrient Removal
Operate enough basin capacity to treat up to 95
lb/1.000 ft3
/day BOD loading.

Nitrification requires adequate alkalinity. Denitrification requires adequate soluble BOD. The microorganisms in
both processes need adequate retention time.

Anoxic zone = 0.3 MG
Aerobic zone = 1.1 MG
Total = 1.4 MG
Anoxic zones =

0.9 MG
Aerobic zones =

3.3 MG
Total = 4.2 MG
3 Aeration basin
Too short of a residence time in the anoxic zone can
increase effluent nitrate and nitrite. Too short of an HRT in the aerobic (aerated) zone can increase ammonia and
BOD.

8.4 hours at

12.6 mgd Hours Hydraulic Residence Time (HRT)
Solids Retention Time (SRT) Days 10 Information only. Use aSRT to calculate wasting rates.

The target aerobic SRT provides the lowest ammonia,
nitrate, nitrite, and BOD concentrations in the MBR
feed.

Days < 6 days Aerobic Solids Retention
Time (aSRT)
Operate enough blowers to maintain the target DO
residual at the end of each aeration basin in service. Aeration blower 6 36,000 scfm 6,000 scfm 7 #1..
- 223 -
Design Criteria
Individual Design Operational Strategy Total Design
Capacity Sub-Process Units
Activated Sludge – Biological Nutrient Removal
Operate enough pumps to return mixed liquor and the
entrained pollutants for additional treatment. One RAS
pump flow equals 1.5 times the design flow, even more at lower influent flows. If needed, the RAS pumps can return 6 times the design influent flow.

RAS pumps 4 75.6 mgd 18.9 mgd – see note
Operate to maintain the desired aerobic SRT, calculated to control the desired mass of solids under aeration. The
waste rate is the calculated pounds removed from the
system, so flow (as MG) x density x 8.34 lb/gallon.
300 gpm

0.43 MG
900 gpm

1.32 MG WAS pumps 3
NOTE: The returned activated sludge is a mixture of suspended solids, entrained pollutants such as ammonia, nitrate, nitrite and BOD, and alkalinity. The more chances the biomass get to remove the pollutants, the better the results. Ammonia reduction in the aerobic zones – nitrification - consumes alkalinity. Conversion of nitrite and nitrate to nitrogen gas in the anoxic zones - denitrification – returns about half of the alkalinity that was consumed in nitrification. RAS flow is not part of the aSRT calculation.

Membrane Bioreactors
The average operating flux rate of each train is 13
gal/ft2
/day, with a maximum rate of 15.9 gal/ft2/day.

2.4 mgd 1d max

2.1 mgd ADF

14.4 mgd 1d max

12.6 mgd ADF 6 Membrane bioreactor
Operate enough to match the influent flow. This helps
maintain hydraulic balance in the activated sludge process.

2.4 mgd 1d max

2.1 ADF

14.4 mgd 1d max

12.6 mgd ADF Permeate pump 6
The MBR PLC maintains the desired porosity of the 0.4-
micron membrane fibers by scouring with air. 4 15,300 scfm 3,825 scfm MBR air scour blower Cleaning of MBR fibers with 0.4-micron openings is
periodically required to retain the desired performance. 2 5.6 mgd 2.8 mgd CIP (clean in place)pump Drain pump 2 7.2 mgd 3.6 mgd Use as needed for maintenance. 8 #1..
- 224 -
Design Criteria
Individual Design Operational Strategy
Total
Design
Capacity
Sub-Process Units
UV Disinfection
Operate enough to allow the daily flow to pass through
the process. Channels 3 14.4 mgd 4.8 mgd
Peak flow rate 21.75 mgd 7.25 mgd
Maintaining the target dose proves that the UV system is operating at the required efficiency level to achieve the desired coliform inactivation.
mJ/cm --- 96 Dose 2
Transmittance (UVT) of 65% or greater is required to
achieve the desired coliform inactivation. Transmittance % --- 65 NOTE: • MBR and UV process equipment provide the best results with minimum variability in flow and pollutant loadings. • Phase II is designed as a system that is pumped into. • Optimizing Phase II influent pumping reduces variability. • In UV disinfection, 254 nanometer wavelength light from the lamps penetrates the cell wall of the microorganism. • The microorganism’s DNA and RNA structure is altered to prevent reproduction. • The microorganism is not destroyed, but without reproductive capacity cannot multiply and is considered dead.
9 #1..
- 225 -
Primary Effluent Pump Station
2 3
4 2
2 1
5 6 7
8 Objective: Transfer roughly 85%
of the total influent flow from
Sutter to Phase II.

Inspection Rounds - Always confirm that the:

5. PE Pumps oil levels are in between the high- and low- level lines on the sight glass.

1. Dilution water pump station isolation gate is open.

2. Wetwell isolation gates are open, unless offline for 6. Seal Water System has flow. Inspect each Flow Switch. maintenance.

3. Wetwell Level Indicators are working. Record the levels. 7. VFD Controllers have no faults.

8. TP2 PE flow meter is providing data at SCADA. This data is used for permit compliance.

4. PE Pumps have no unusual noises and vibration.
10 #1..
- 226 -
Influent Screening
Inspection Rounds - Always confirm that the:

1. Screen(s) in use are rotating. 6. Fine screen HMIs have no alarms and faults.

7. Influent sampler is working, and the volume in the sample jug is increasing.

2. Wash spray solenoids are operating properly.

8. Sampler refrigerator is at 6o

3. Spray water pressure is in the operating range. Offline C. compactors should see 100-120 psig.

4. Fine screen grease pumps are not faulted. 9. Foul air fans are running.

10. Downstairs plumbing is not leaking. Take corrective action if needed.

5. Screenings are reaching the washer/compactors.
1 2
6 5
4 3
7 9
10 8
Objective: Remove all debris greater
than 1-millimeter to prevent fouling of
downstream processes.

Compliance
Sampler
11 #1..
- 227 -
Washer Compactor
Inspection Rounds - Always confirm that the:

1. Screenings are moving from the screens to the washer 4. Wash water is flowing to the machine. compactor.

2. Drive unit is turning. 5. Compacted screenings are filling the Screenings Bin.

3. Drain is not plugged, and area is clean from debris. 6. Full hoppers are swapped out. 1 2
3 4
5 6
Objective: Wash biomass
from screened debris and
prepare screenings for
landfilling.
12 #1..
- 228 -
Objective: Remove
entrained pollutants from
screened influent.

BNR – Aeration Basins
Inspection Rounds - Always confirm that the:

6. Air header valves are open to the correct position and all header pressures for proper range ( 8-9 psig).

1. Flow to and from each aeration basin in use is equal. Record Distribution Box Level Indicator value.

7. DO analyzer readings are in the operating range. Check SC200 for warnings or faults.

2. Foul air fans are running.

8. ML Step Screen HMI has no alarms. Run screens in HAND daily. Check for unusual noises/vibrations.

3. Spray water is flowing, and spray nozzles are not plugging at the distribution box, aeration basins and mixed liquor distribution channel.

9. Basins and channels appear typical. Report unusual
appearance, foaming and any other unusual situations.

4. Anoxic zones do not have excessive foaming. Use hose to break up heavy caking.

5. Anoxic mixers are operating by feeling hoist cables for vibration. 10. Position of normally closed drain gates and level indicator. 13 #1..
- 229 -
BNR – Aeration Blowers
Inspection Rounds - Always confirm that the:

1. Blower control panel controls are in AUTO and there are no local 5. Auto Rotation is in AUTO. Note LEAD blower. alarms, faults or warnings. Report.

6. Air filter differential pressure is within operational range.

2. Blowers are operating correctly. Report unusual vibrations or noises.

3. Coolant levels on each blower are full. Check for coolant leaks. 7. Oil levels are in operating range.

4. MCP has no outstanding alarms. Report. 8. Blower header discharge pressure setpoint is correct.

9. Area has no debris or clutter. Take action.

BE AWARE
ALWAYS wear hearing protection when working in this area.

Surge conditions may occur.

Objective: Provide enough oxygen to
the mixed liquor to support the
microbiology that removes the
pollutants.
1 2 3 4 5 6 7 8 9
14 #1..
- 230 -
BNR – RAS Pumping
Inspection Rounds - Always confirm that:

1. All seven RAS channel mixers are running by
feeling for vibration on cables..

2. Each RAS channel mixer is facing in the desired
direction.

3. The shaft between the motor and pump of any
operating RAS pump is turning.

4. The discharge pressure from each running RAS
pump is in the operating range. A large difference
in discharge pressure between RAS pumps should
be investigated.

5. Each check valve arm is moving and open about
the same with all running pumps, which indicates
that the pumps are working about the same.

6. Seal water pressure is 8 to 10 psig higher than
RAS pump discharge pressure. Flow switch will
display a Red Alarm light if pump is OFF.

7. The level indicator is working. Failure of the level indicator will shut down all Phase II production.

Objective: Return microorganisms to the
head of the aeration basins to maintain
treatment.
1 7
5 4 3
2 6

BE AWARE
Confirm RAS channel level.

A consistent level is critical to maintaining Phase II production. 15 #1..
- 231 -
BNR – Scum and WAS Pumping
Inspection Rounds - Always confirm that the:

1. Mixed liquor scum box is pumped down. Remove excess scum. 5. WAS pump is operating, and pressure is in operating range.

6. Totalized flow is increasing in SCADA. Local display reading is equal to the sum of two flow meters. Record.

2. RAS channel scum box is pumped down. Hose down if
necessary.

7. Seal water is flowing. Verify seal water pressure is 6-10 psi above discharge pressure.

3. Valving for WAS and Scum pumps is aligned as needed.

4. Scum pump is operating, and pressure is in operating range. 8. Floor drains have no clogs and debris.

9. Sump has no clogs (trash/debris) or unusual water depth. Clean if necessary. 4 1
2 3
6 5
Objective: Maintain the desired
solids retention time to achieve
effluent nutrient residuals
requirements.
7 8 9
16 #1..
- 232 -
Membrane Bioreactor – Overview 1
Inspection Rounds - Always confirm that the:

1. Air manifold manual valves to each MBR in use
are 100% open.

2. Air scour distribution in the MBR tanks is even.
(Yellow Housing Indicators)

3. Influent gates that allow mixed liquor to flow
into an MBR are 100% open for the units in use.

4. Drain gates that allow for MBR structure
cleaning are closed for the units in use.

5. Check air flow to each MBR Tank. (HMI)

6. MBR control panel controls are in AUTO.

7. MBR operational screens show no alarms.

Objective: Separate the MLSS from
effluent compliant treated wastewater.
4 1
1 1
2 2
2 4
4 5
7 6 Control Panel
17 #1..
- 233 -
MBR System – Overview 2
Inspection Rounds - Always confirm that the:

5. Eductors and actuators on membrane permeate manifolds do not have excessive heat and/or are cycling too frequently.

1. Suction valves to and discharge valves from the permeate pumps in use are open.

6. Air scour manifold couplers are not leaking by listening for air leaks.

2. Suction pressure of each permeate pump in use are in the expected operating range.

3. Flow from each MBR in use is about the same. 7. MBRs in use go through one scour cycle without problems.

4. Permeate storage levels are adequate to meet demands. 8. Check the turbidimeter for proper operation.

Objective: Separate the MLSS from effluent-compliant
treated wastewater.
1 2 3
5 6 4

BE AWARE
Excessive turbidity from an MBR
train may indicate the failure of one
or more membrane fibers. Pinning
or plugging the cassette may be
needed to remedy the problem.
7 8
18 #1..
- 234 -
MBR System – Overview 3
Inspection Rounds - Always confirm that the:

8. Pneumatic valve are operating properly and there are no air leaks.

1. CIP line pH probe is not leaking, and the SC200 Controller has no outstanding faults and warnings.

2. Permeate Storage has no leaks or cracks. 9. MBR Drain Pump Air Relief Valves are open.

10. Sump is at normal level and area is clear of debris and clogs.

3. Seal water is flowing through each online pump, and the seal water pressure is at 40 psi.

11. Spent CIP tank drain valve is open unless performing Acid Clean-in-Place.

4. Oil levels on each permeate pump are visible. Report any oil leaks.

12. Maintenance Clean on next MBR Tank in rotation is
started between 1000 to 1100.

5. Flow through each Turbidity Meter is 250-750 mL/min.

6. SC200 Controllers have no faults or warnings, including 13. Plant drain pumps are in AUTO.

UVS-002A Sample Board.

7. CL17 reagent levels are enough. Replace as needed. 14. Plant drain wetwell level is not high.

ACT
Correct small problems before they disrupt the
membrane filtration process.
13 14
1 2 3 4 5 6 7 8 9 10
11 Objective:

Separate the
MLSS from
effluent-compliant
treated
wastewater.
12 Control Panel
19 #1..
- 235 -
MBR – Air Scour Blowers
Inspection Rounds - Always confirm that the:

5. High pressure air system is at proper operating pressure (110- 130 psi).

1. Air scour blower MCP controls are in AUTO and there are no local alarms. Confirm and record lead blower.

2. Air compressor control panel controls are in AUTO and 6. Oil levels are in operating range. Report any oil leaks, there are no local alarms.

7. Filter differential pressure is within operational range. Blower intake filters are free of dust and visible dirt. Clean up as needed.

3. Air compressor system has no leaks.

4. Blower header discharge pressure setpoint is correct. 8. Area has no debris or clutter.

Record it.
4 5 6 7
2 BE AWARE
ALWAYS wear hearing protection when working in this area.

Surge conditions may occur.
1 3
8 Objective: Forced air to remove loosely attached solids that foul the membrane’s filtration pores. 20 #1..
- 236 -
MBR – Citric Acid Cleaning System
Inspection Rounds - Always confirm that the:

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

1. Pumps are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

2. Fittings are not leaking. If a leak is found, contact the 5. Spill containment area and drain sump are free of debris. supervisor on duty immediately to start corrective actions.

3. Valving is in the correct alignment. 6. Eye wash, shower and alarms are working. 1 2 3
4 5
6 Objective: Periodically dissolve contaminants off the MBR fibers to maintain desired performance.

BE AWARE
ALWAYS wear PPE when working in this area. 21
#1..
- 237 -
MBR – Sodium Hypochlorite Cleaning System
Inspection Rounds - Always confirm that the:

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

1. Pumps are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

2. Fittings are not leaking. If a leak is found, contact the 5. Spill containment area and drain sump are free of debris. supervisor on duty immediately to start corrective actions.

3. Valving is in the correct alignment. 6. Eye wash, shower and alarms are working.

BE AWARE
ALWAYS wear PPE when working in this area.

Objective: Periodically dissolve contaminants off the MBR fibers to maintain desired performance. 1 3
4 5 6
2 22
#1..
- 238 -
MBR – Sulfuric Acid Cleaning System
Inspection Rounds - Always confirm that the:

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

1. Pumps are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

2. Fittings are not leaking. If a leak is found, contact the 5. Spill containment pallet is free of debris. supervisor on duty immediately to start corrective actions.

3. Valving is in the correct alignment. 6. Eye wash, shower and alarms are working.

BE AWARE
ALWAYS wear PPE when working in this area.

Objective: Periodically dissolve contaminants off the MBR fibers to maintain desired performance. 23 #1..
- 239 -
MBR – Sodium Hydroxide System
Inspection Rounds - Always confirm that the:

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

1. Pumps are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

2. Fittings are not leaking. If a leak is found, contact the 5. Spill containment area and drain sump are free of debris. supervisor on duty immediately to start corrective actions.

3. Valving is in the correct alignment. 6. Eye wash, shower and alarms are working.

BE AWARE
ALWAYS wear PPE when working in this area.

Objective: Neutralize pH of Clean-in-Place waste before being discharged through the plant drain pump station to the ponds.
6 24
#1..
- 240 -
MBR – Phase II to Phase I Sodium Hypochlorite Transfer
Inspection Rounds - Always confirm that the:

1. Pump is not leaking. If a leak is found, contact the supervisor 3. Valving is in the correct alignment. on duty immediately to start corrective actions.

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

2. Fittings are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

Objective: Supply Phase II bulk hypo to satellite storage areas in Phase I.

BE AWARE
ALWAYS wear PPE when working in this area.
25 #1..
- 241 -
MBR – Phase II to Phase I Citric Acid Transfer
Inspection Rounds - Always confirm that the:

1. Pump is not leaking. If a leak is found, contact the supervisor 3. Valving is in the correct alignment. on duty immediately to start corrective actions.

4. Volume of chemical in storage is adequate. If below the “time to order” volume, contact the supervisor on duty so more can be ordered.

2. Fittings are not leaking. If a leak is found, contact the supervisor on duty immediately to start corrective actions.

Objective: Supply Phase II bulk citric acid to satellite storage areas in Phase I.

BE AWARE
ALWAYS wear PPE when working in this area.
4 2 3
1 4
3 26
#1..
- 242 -
Ultraviolet Disinfection
Inspection Rounds - Always confirm that the:

7. Automated discharge valves are in AUTO to immediately divert non-compliant effluent.

1. UV control panel controls are in AUTO. Check all SC200 Controllers and the Master Control screen for faults or warnings.

8. Phase II effluent sampler is working, and the volume in the sample jug is increasing.

2. UV transmittance and UV dosage are above the minimum permitrequired operational targets.

9. Sampler refrigerator is at the correct temperature of 6o

3. Wiper system for hydraulic fluid leaks. C. 4. Excessive foam build-up at the channel ends is knocked down 10. HVAC skid HMI is in Local control and has no alarms. using a hose.

5. Air pressure at Diversion Valves is greater than 75 psig. 11. System pressure has continuity with pressure setpoint.

12. CCW Supply and Return temperatures (50-110 Supply and 60-120 Return) are in range.

6. Effluent analyzers for DO, pH, and turbidity are working. Calibrate each as required by the manufacturer.
3 Objective:

Deactivate
pathogenic
organisms prior
to effluent
discharge. 5
6 1
4 7
8 2
3 3 4
4 9 10 11 12

BE AWARE
Inspect bulb hours for
all channels. If ANY
bulb has 11,800 hours
of run, submit work
order for bulb
replacement and
notify supervisor.

Phase II
Process
Sampler
27 #1..
- 243 -
Impacts to the Phase II Processes
Influence Concerns Location to
Process
Hydraulic retention time can affect BOD removal. Higher effluent BOD creates a larger load on Jennings’ processes. Sutter primary clarification Upstream
Warmer temperatures can increase the portion of BOD that is soluble. Soluble BOD (sBOD) is consumed first by the denitrifying organisms. Warmer effluent can result in more efficient nitrate removal.

Primary clarifier effluent
(Phase II influent)
temperature
Transit time, combined with warmer temperature, allows more biological action in the sewer, which can create septicity and reduce the amount of sBOD and increase the amount of filamentous organisms.

Sewage flow retention time
from Sutter to Jennings
Water returned from the facultative ponds is necessary to limit nutrient loading from high strength primary effluent. Phase II is designed to treat a maximum BOD load of 400 mg/L.

Make-up (dilution) water
flow and quality
Maintain a consistent flow rate through Phase II reduces variability, which improves MBR and UV performance.

Primary effluent/dilution
water pumping rate
Outside influences could negatively affect the BNR or UV processes. For example, tannins and lignins from airborne agricultural dust negatively affects the UV transmittance.

Air or waterborne
insecticides or herbicides
In-plant drains Chemical or fuel spills could disrupt the BNR process.

Downstream
Compost drainage Leachate can return ammonia and other compounds.

The Effluent Pump Station pumps tertiary effluent to the Delta-Mendota Canal. Minimum flow through the pump station is 1,800 gpm. Flow lower than this will cause the pumps to operate off the pump’s curve and cause unwanted starts and stops.

Effluent Pump Station (EPS)
28 #1..
- 244 -
BNR Awareness
29 #1..
- 245 -
Process Operations Strategy - BNR
Variable What it controls Why use the strategy Where is it implemented Evaluating the influent data and
output from each subsequent
treatment process.

Optimum performance with lowest
operating and maintenance costs.

The number of each type of
equipment used to treat the
sewage.

Operate appropriate
number of aeration
basins
Evaluating the TSS, BOD and
ammonia removal efficiencies
against the solids inventory.

Ensure adequate solids inventory is
positioned to remove these
pollutants with the appropriate
number of basins in service.

The hydraulic, TSS, BOD and
ammonia loading to
aeration basins.

Screened influent
flow
Wasting of solids inventory based on
mixed liquor density and the aerobic
volume in use.

Achieve performance that meets
discharge permit requirements
100% of the time.

TSS, BOD and ammonia
reduction.

Aerobic Solids
Retention Time
(aSRT)
Solids inventory is calculated using
the MLSS density times the aeration
basin volume that is aerated. The
volume of swing zones operating in
the anoxic mode are not part of the
aerated volume total.

Optimize the mass of solids that
requires aeration. Aeration requires
power, which is the largest process
operating cost at the facility.

The effectiveness of the
activated sludge process to
remove TSS, BOD and
ammonia.

Solids inventory
Evaluating the TSS, BOD and
ammonia removal reductions against
the solids inventory mass and the DO
residual.

The lowest DO residual that
achieves the permit mandated TSS,
BOD and ammonia provides the
desired results at the lowest power
cost with the least work from the
aeration blowers.

The effectiveness of the
activated sludge process to
remove TSS, BOD and
ammonia.

Dissolved oxygen
residual
30 #1..
- 246 -
Process Operations Strategy - MBR
Variable What it controls Why use the strategy Where is it implemented Evaluating the influent data and
output from each subsequent
treatment process.

Optimum performance with
lowest operating and
maintenance costs.

The number of individual unit
components used to treat the
sewage.

Operate appropriate
number of MBR units
MBR control panel.

Maintain the porosity and
effectiveness of the individual
membranes.

Solids accumulation on the
membrane. The air scour
system introduces airflow at the
bottom of each membrane
cassette. Turbulence created by
the airflow scours accumulated
solids from the surface of the
membrane fibers.

MBR air scour
MBR control panel.

To achieve the required
performance of the system longterm.

Effectiveness of the membrane
fibers for straining away
entrained pollutants.

Maintenance cleaning
31 #1..
- 247 -
Process Operations Strategy - UV
Variable What it controls Why use the strategy Where is it implemented Follow the Standard Operating
Procedure
A proactive seasonal strategy is
used to achieve permit
compliance.

The effectiveness of the UVT. Entrained tannin and
lignin in the MBR effluent
Online analyzers that track: • UV transmittance (UVT) • UV dose (mJ/cm2 )
Maintain permit compliance.

Out-of-range UV performance
automatically initiates a change
of discharge location from the
effluent pump station to the
non-compliance facultative
pond.

Discharge to the tertiary
effluent pump station or to the
non-compliance facultative
pond that receives noncompliant effluent.

UV system turbidity
analyzer outputs
Online analyzers that track: • Dissolved oxygen (mg/L) • pH (standard units) • Turbidity (NTU) Maintain permit compliance.

Out-of-range results
automatically initiate a change
of discharge location from the
effluent pump station to the
non-compliance facultative
pond.

Discharge to the tertiary
effluent pump station or to the
non-compliance facultative
pond that receives noncompliant effluent.

Effluent analyzer outputs

BE AWARE
Confirm automatic change from out-of-range results
32 #1..
- 248 -
Key Performance Parameter - SRT
Mass (pounds) in the process
Mass (pounds) lost
Aerobic SRT = Volume of Aerated Portion of Bioreactor(s) in use as MG X MLSS, mg/L X 8.34 lb/gal ___________________________________________________________________ (Waste Flow, MG x TSS, mg/L x 8.34 lb/gal) + (Eff TSS, mg/L x Eff Flow, mgd x 8.34 lb/gal) The ideal solids inventory achieves the lowest ammonia concentrations in the effluent at the lowest mixed liquor density. Less inventory requires less air, reducing power consumption. 33 BE AWARE
Don’t get hung up on MLSS or RAS density as it is the solids inventory mass (pounds) that is providing the results. Compare the mass to the process outputs (effluent ammonia, nitrate, nitrite, phosphorus) and waste excess solids to adjust the results as needed.

NOTE
Total SRT is the calculation used to set the solids inventory for Phase I. For Phase II, aerobic SRT is used to set the solids inventory mass.
#1..
- 249 -
Key Performance Indicators - BNR
Variable Location Units Operating Range Purpose
Entrained oxygen poisons conversion of nitrate to nitrogen gas.
1st anoxic zone mg/L 0.0 - 0.3
Dissolved Oxygen
(DO)
2 mg/L 0.0 - 0.1 nd anoxic zone
Meet BOD and ammonia conversion demands.
1 mg/L 0.5 – 2.5 st aerated zone
2 mg/L 1.0 – 2.0 nd aerated zone
Air flow Aerated zones - Total scfm Track
Maintain adequate solids inventory to complete ammonia
conversion. Sustain BNR process.

Do not exceed
10,000
mg/L Mixed liquor at end
of each basin
Total Suspended
Solids (TSS)
Total WAS mg/L
Total WAS and Foam mg/L
RAS and Foam mg/L
Note: RAS density (post-MBR) is the same as WAS density.

RAS Flow MGD x - y Return nitrifiers and denitrifiers to BNR process.

Summed values to maintain target aSRT.

WAS Flow gpm x - y
WAS & Foam Flow gpm x - y
The ideal solids inventory achieves the lowest ammonia
concentrations in the effluent at the lowest mixed liquor density. Mixed liquor density is a product of the calculation, not the target parameter.

Aerobic SRT Calculation days x - y
Solids Inventory Calculation lbs x - y Result of the aSRT calculation.

Track nitrification performance. About 7.5 pounds of
alkalinity is consumed for every pound of ammonia treated in BNR.
mg/L and x - y
lb/day Alkalinity Primary effluent
Track nitrification performance. About 3 pounds of alkalinity is returned by the conversion of nitrate to nitrogen gas. x - y mg/L and lb/day Head of aeration
basin Alkalinity
34 #1..
- 250 -
Key Performance Indicators - MBR
Variable Location Units Operating Range Purpose
Flow per unit Each cell gpm x - y Match operation to influent flow.

Track unit performance required to achieve permit
compliance. NTU x - y
1 each (process) and
1 common
(compliance)
Turbidity
TMP = feed pressure – permeate pressure. Can indicate
excessive fouling or fiber failure. Each cell psig x - y Transmembrane
pressure (TMP)
Track production rate. Can indicate excessive fouling or fiber failure. As MLSS density increases the flux rate decreases. Flux Each cell gal/sf/min x - y The permeability of a membrane is the flux rate divided by the transmembrane pressure. Permeability Each cell gal/sf/d x - y The viscosity of water increases as water temperature
decreases. Permeability and flux rate decrease in colder temperatures.

Temperature Influent degrees track
Key Performance Indicators - UV
Variable Location Units Operating Range Purpose
Influent flow Head of process MGD x - y Plan channel outages for maintenance.

The percentage of light that passes through a water sample at the wavelength of 254 nm. Less percentage equals more turbid water or other interference.

UV transmittance UV control panel % x - y
An increase in dosage for a comparable flow may indicate lamp fouling. Dosage UV control panel mj/cm2 x - y
UV intensity UV control panel % x - y Note: this is measured as mW/cm2 at Phase I.

Bulb run time UV control panel hours Do not exceed 12,000 Write a work order no later than 11,800 hours.

More banks for the same flow may indicate a loss of
efficiency or less effective MBR treatment upstream. Banks in service Track x - y 35 #1..
- 251 -
Key Performance Indicators - Effluent
Variable Measurement Units Do Not Exceed
pH Instantaneous minimum su 6.5
pH Instantaneous maximum su 8.5
Daily maximum mg/L 20
Biochemical Oxygen Demand 5-day at 20oC
Daily maximum lbs/day 2,500
Weekly average mg/L 15
Weekly average lbs/day 1,900
Monthly average mg/L 10
Monthly average lbs/day 1,200
Daily maximum mg/L 20
Total Suspended Solids
Daily maximum lbs/day 2,500
Weekly average mg/L 15
Weekly average lbs/day 1,900
Monthly average mg/L 10
Monthly average lbs/day 1,200
Weekly average mg/L 1.5
Ammonia – April 1 to Sep 30 Weekly average lbs/day 190
Monthly average mg/L 0.85
Monthly average lbs/day 100
Weekly average mg/L 2.8
Ammonia – Oct 1 to Mar 31 Weekly average lbs/day 350
Monthly average mg/L 1.6
Monthly average lbs/day 200
Nitrate plus Nitrite Weekly average mg/L 19
Nitrate plus Nitrite Monthly average mg/L 10
Note: Pounds per day is calculated as Flow in MG x mg/L x 8.34 lbs/gal Effluent
36 #1..
- 252 -
Phase II Awareness
Criteria Units Why Tracked Actions
Confirm Phase I Adjust as needed to meet design flow rate operability is
maximized
Actual Flow / Design Flow %
Add or subtract dilution water based on Sutter effluent qualities
Evaluate Phase I
influent conditions
Alkalinity Load / Ammonia Load Ratio
Increase or decrease wasting to meet target, basing
adjustments on effluent nitrogen compounds
Optimize BNR
process
Difference between Target SRT and %
Actual SRT
Increase or decrease waste pump run time to
compensate for over- or under-pumping
Confirm wasting is
operated as desired
Difference between Waste and Waste Pounds
Target
Evaluate effects of actual SRT, alkalinity, RAS flow, mixed liquor overflow, water temperature, and dilution water
flow rate
Confirm BNR
effectiveness
Effluent ammonia mg/L
Evaluate effects of actual SRT, alkalinity, RAS flow, mixed liquor overflow, water temperature, and dilution water
flow rate
Confirm BNR
effectiveness
Effluent nitrate mg/L
Monitor MBR Evaluate chemical cleaning frequency
conditions
Difference between daily average %
membrane permeability and Design
MAX
Monitor MBR Evaluate membrane cassette replacement
conditions
Difference between post-recovery %
permeability and Design MAX
Monitor MBR Evaluate NTU analyzer performance
effectiveness
Difference between NTU MAX and %
Actual NTU
Monitor MBR Evaluate MBR fiber integrity
effectiveness
Difference between daily average NTU %
and Design NTU
Evaluate UV operating strategy, MBR effectiveness, and
effluent qualities
Monitor UV
effectiveness
Difference between actual UV %
Transmittance and MIN allowed
37 #1..
- 253 -
Process Sampling
Comments
Required by
Typical range Permit
Grab & Time (G)
or 24-hour
Composite
Process Area Frequency (Comp)
Phase II Influent
Influent Q, MGD Daily NO Flow meter
Composite Sampler, flow paced with a 5-
gallon jug
BOD, mg/L Daily Comp NO
TSS, mg/L Daily Comp NO
COD, mg/L M, W, F Comp NO
Alkalinity, mg/L M, T, W, Th, F Comp NO
Phase II Aeration Basins
MLSS, mg/L M, T, W, Th, F Grab NO
MLVSS, mg/L M, T, W, Th, F Grab NO
RAS, TSS, mg/L Daily Grab NO
WAS, TSS, mg/L Daily Grab NO Continuous read to SCADA
DO, mg/L Daily
Phase II Permeate
Turbidity, NTU Daily ---- YES Online meter
UV Transmittance, % Daily ---- YES Online meter
Flow, gpm Daily ---- NO Flow meter
pH ? Ammonia or TKN?
38 #1..
- 254 -
Process Sampling
Comments
Required by
Typical range Permit
Grab & Time
(G) or 24-hour
Composite
Process Area Frequency (Comp)
Phase II Disinfection/Final Effluent
UV Intensity, mW/cm2 Daily Comp YES Online Meter
UV Dosage, mJ/cm2 Daily Comp YES Calculated
pH, SU Daily Comp YES Online Meter
Flow, gpm Daily Comp YES Flow Meter
BOD, mg/L Daily Comp NO Composite Sampler, flow paced
TSS, mg/L Daily Comp NO Composite Sampler, flow paced
NO3 as N, mg/L Weekly Comp NO Composite Sampler, flow paced Alkalinity, mg/L M, T, W, Th, F Grab NO
Total Coli, MPN/100ml Daily Grab YES
Methyl Mercury, ug/L Monthly Grab NO
Total Mercury, ng/L Monthly Grab NO
Selenium, ug/L Monthly Grab NO
Ammonia, mg/L Mon & Weds Grab NO
DO, mg/L Mon & Weds Grab NO Handheld Meter
Temp Mon & Weds Grab NO Online meter: "Grab" reading from wall COND, umhos/cm Mon & Weds Grab NO
Chlorpyrifos, ug/L Annually Grab NO
Diazinon, ug/L Annually Grab NO
39 #1..
- 255 -
SCADA Information – Slide Number and Title
Process Control Overview 932 WAS/Scum Pump Station Overview 969 Sodium Hypo (SHS) Dosage Controls Instrument Limits Alarm Setpoints pg. 1 935 RAS Channel Mixers 1 970 Primary Effluent Pump Controls Instrument Limits Alarm Setpoints pg. 2 936 RAS Channel Mixers 2 971 Diltion Water Pump Controls Communications Overview pg. 1 937 RAS Pump Station Overview 972 Dilution Water Valve Controls Communications Overview pg. 2 940 Membrane System Overview 973 Plant Drain Sump Pump Systems Tertiary Ph 2 Site Overview 941 Membrane System Timers and Setpoints 974 WAS/Scum Pump Controls Primary Effluent Pump Station 942 Membrane Tank #1 975 WAS Sump Pump Control Dilution Water Pump Station 943 Membrane Tank #2 976 MBR Air Scour Building HVAC Control Fine Screen Area Overview 944 Membrane Tank #3 977 Aeration Basin #1 Mixer and Valve Controls Fine Screen and Compactor #1 945 Membrane Tank #4 978 Aeration Basin #2 Mixer and Valve Controls Fine Screen and Compactor #2 946 Membrane Tank #5 979 Aeration Basin #3 Mixer and Valve Controls Fine Screen and Compactor #3 947 Membrane Tank #6 980 Aeration Basin Drain Pump Controls Booster Pumps and Fine Screen Strainers 948 MBR Permeate Storage Tank and CIP Pumps 981 RAS Channel Mixer Controls BNR Aeration Basins Overview 949 MBR Sump Pumps 982 RAS Pump Controls Aeration Basin #1 and Mixers 950 MBR Chemical Containment and Drain Pumps 983 MBR Permeate Pump #1 Controls Aeration Basin #2 and Mixers 951 MBR Caustic Soda System and CIP Tank 984 MBR Permeate Pump #2 Controls Aeration Basin #3 and Mixers 952 MBR Sodium Hypochlorite System 985 MBR Permeate Pump #3 Controls Odor Control System 953 MBR Citric Acid System 986 MBR Permeate Pump #4 Controls Aeration Blower Building Overview 954 MBR Sulfuric Acid System 987 MBR Permeate Pump #5 Controls Aeration Blowers #1 & #2 Controls 955 UV System Overview 988 MBR Permeate Pump #6 Controls Aeration Blowers #3 & #4 Controls 956 UV Channel #1 989 MBR Drain Pump Controls Aeration Blowers #5 & #6 Controls 957 UV Channel #2 990 Tertiary Effluent Pump Controls Aeration Blowers Building HVAC 958 UV Channel #3 991 HVAC Water Source MBR Air Scour Blower Building Overview 961 MBR CIP Pump Controls 992 Primary Electrical Building HVAC MBR Air Scour Blowers #1 & #2 Controls 962 Combined Tertiary Effluent sample Station 993 Main Electrical Building HVAC 994 Plant Drain Pump Controls Tertiary 2 Membrane Permeate Effluent Sample Station MBR Air Scour Blowers #3 & #4 Controls 963
MBR Air Blowers Flow Distribution 964 UV Building HVAC 995 SWGR2, SWGR3, and MCC231 Power Monitoring SWGR24, MCC241, and MCC2411 Power
Monitoring MBR Air Scour Building HVAC 965 Aeration Blower Building HVAC Control 996 MBR High Pressure Air 966 Tertiary Effluent Pump station 997 MCC21, MCC25, and MCC26 Power Monitoring Mixed Liquor Screens and Conveyor 967 3W Pump Station 998 Runtime Reset Table 968 3W Hydropneumatic Tank 999 Plant Help 40
#1..
- 256 -
Standard Operating Procedures
Title SOP ID
Phase II Plant
Shift Procedures JEN TP2 OPS 1
Plant Startup JEN TP2 OPS 2
Plant Shutdown JEN TP2 OPS 3
System Reset and Check JEN TP2 OPS 4
Primary Effluent Pump Station
Primary Effluent Pump In or Out of Service and Control JEN PEP TP2 1 Drain System In or Out of Service JEN PEP TP2 2
System Reset and Check JEN PEP TP2 3
Screening and Compacting
Fine Screen In or Out of Service JEN SCR TP2 1
Screenings Washer/Compactor In or Out of Service JEN SCR TP2 2 Screenings Handling (Removal) JEN SCR TP2 3
Influent Sampler Inspection JEN SCR TP2 4
Foul Air Fans In or Out of Service JEN SCR TP2 5
41 #1..
- 257 -
Standard Operating Procedures
Title SOP ID
Aeration Basins/BNR
Aeration Basin In or Out of Service and Control JEN AER 1 Anoxic Zone Mixer In or Out of Service JEN AER 2
DO Analyzer Verification and Calibration JEN AER 3
Recognizing and Response to Analyzer Failure JEN AER 4
Aeration Basin Drain System Operation JEN AER 5
Aeration Diffuser Exercising and Cleaning JEN AER 6
Aeration Blower In or Out of Service and Control JEN AER 7 RAS Pump In or Out of Service and Control JEN AER 8
RAS Wetwell Level Indicator In or Out of Service JEN AER 9 WAS Pump In or Out of Service and Control JEN AER 10
RAS Channel Cleaning JEN AER 11
AER 6 = Need Manual Pilot Testing to Build Automated Sequence 42 #1..
- 258 -
Standard Operating Procedures
Title SOP ID
Chemical Handling
Chemical Storage Inspection JEN CHEM TP1 1
Chemical Receiving JEN CHEM TP1 2
Chemical Spill Response JEN CHEM TP1 3
Chemical Containment Cleanup JEN CHEM TP1 4
Citric Acid Pump In or Out of Service JEN CHEM TP1 5
Citric Acid Pump Control JEN CHEM TP1 6
Citric Acid Storage Tank In or Out of Service JEN CHEM TP1 7 Citric Acid Storage Tank Cleaning JEN CHEM TP1 8
Sodium Hypochlorite Pump In or Out of Service JEN CHEM TP1 9 Sodium Hypochlorite Pump Control JEN CHEM TP1 10
Sodium Hypochlorite Storage Tank In or Out of Service JEN CHEM TP1 11 Sodium Hypochlorite Storage Tank Cleaning JEN CHEM TP1 12 Phosphoric Acid Pump In or Out of Service JEN CHEM TP1 13 Phosphoric Acid Pump Control JEN CHEM TP1 14
Phosphoric Acid Storage Tank In or Out of Service JEN CHEM TP1 15 Phosphoric Acid Storage Tank Cleaning JEN CHEM TP1 16
System Reset and Check JEN CHEM TP1 17
43 #1..
- 259 -
Standard Operating Procedures
Title SOP ID
Membrane Bioreactors
MBR Tank In or Out of Service and Control JEN MBR TP2 1 RAS Channel Mixer In or Out of Service JEN MBR TP2 2
Air Scour Blower In or Out of Service and Control JEN MBR TP2 3 Permeate Tank In or Out of Service and Control JEN MBR TP2 4 Permeate Pump In or Out of Service and Control JEN MBR TP2 5 Maintenance Clean-in-Place Operation and Control JEN MBR TP2 6 Step Screen In or Out of Service and Control JEN MBR TP2 7 Scum Box Cleaning JEN MBR TP2 8
System Reset and Check JEN MBR TP2 9
Turbidimeter In or Out of Service and Maintenance JEN MBR TP2 10 UV System
UV Vessel In or Out of Service JEN UV TP2 1
UV System In or Out of Service and Control JEN UV TP2 2 UV Lamp Module In or Out of Service JEN UV TP2 3
UV Module Cleaning Procedures JEN UV TP2 4
Effluent Sampler Inspection JEN UV TP2 5
Turbidimeter In or Out of Service and Maintenance JEN UV TP2 6 UV Transmittance Meter In or Out of Service and Maintenance JEN UV TP2 7 System Reset and Check JEN UV TP2 8
Tannin and Lignin Response Plan JEN UV ALL 10 44
#1..
- 260 -
Standard Operating Procedures
Title SOP ID
Chemical Handling
Chemical Storage Inspection JEN CHEM TP2 1
Chemical Receiving JEN CHEM TP2 2
Chemical Spill Response JEN CHEM TP2 3
Chemical Containment Cleanup JEN CHEM TP2 4
Citric Acid Pump In or Out of Service JEN CHEM TP2 5
Citric Acid Pump Control JEN CHEM TP2 6
Citric Acid Storage Tank In or Out of Service JEN CHEM TP2 7 Citric Acid Storage Tank Cleaning JEN CHEM TP2 8
Sodium Hypochlorite Pump In or Out of Service JEN CHEM TP2 9 Sodium Hypochlorite Pump Control JEN CHEM TP2 10
Sodium Hypochlorite Storage Tank In or Out of Service JEN CHEM TP2 11 Sodium Hypochlorite Storage Tank Cleaning JEN CHEM TP2 12 Sulfuric Acid Pump In or Out of Service JEN CHEM TP2 13 Sulfuric Acid Pump Control JEN CHEM TP2 14
Sulfuric Acid Storage Tank In or Out of Service JEN CHEM TP2 15 Sulfuric Acid Storage Tank Cleaning JEN CHEM TP2 16
Sodium Hydroxide Pump In or Out of Service JEN CHEM TP2 17 Sodium Hydroxide Pump Control JEN CHEM TP2 18
System Reset and Check JEN CHEM TP2 19
45 #1..
- 261 -
Standard Operating Procedures
Title SOP ID
Auxiliary Systems
3WC Cl 17 Maintenance JEN UTL 6
Air Compressors Operation and Control JEN UTL 9
Hydropneumatic Tank Operation and Control JEN UTL 10
Plant Drain Pumps In and Out of Service JEN UTL 11
3W System In and Out of Service and Control JEN UTL 12
HVAC Skid Operation and Control JEN UTL 13
46 #1..
- 262 -
Notification
RECORD
the time
of each
action
The Operations Supervisor receives a
call from about a sanitary sewage
overflow or other offsite problem
The Operations Supervisor receives a
call from a plant operator about a
potential permit violation or other
problem at Sutter or Jennings
Operations Supervisor: Has VERBAL discussion with WQC Superintendent immediately.

WQC Superintendent: FOLLOWS RWQB notifications and procedures and process.

Immediately CONTACTS Public Works Director.

WQC Superintendent: VERBALLY INITIATES Critical Incident Response investigation with Operations Supervisor.

Operations Supervisor: PROVIDES draft Critical Incident Response report to Operations Superintendent.

Operations Supervisor: INTERVIEWS Plant Operators to get the details for the Critical Incident Response report.

WQC Superintendent: Reviews incident details with Public Works Director PROVIDES Critical Incident details to RWQB.

WQC Superintendent • DIRECTS staff to evaluate response for potential improvements • ENSURES improvements are completed in a timely manner #1..
- 263 -
Operator II, I and Trainee Duties and Expectations
Duties
• Make Field Observations, such as: • Equipment status
• Instrument status
• Sampler status
• Safety conditions
• Confirm instrument and analyzer feedback and
calibrate as needed
• Review operational reports and SCADA trends daily
to keep up on process performance
• Take corrective actions as needed
• Initiate maintenance work orders when required to
correct equipment issues
• Perform housekeeping and maintenance tasks
• Make log entries
• Collect samples
Expectations
• Perform process and equipment condition assessments
and observations
• Conduct field measurements and tests as required
• Record field data
• Take corrective actions to re-establish operational targets • Take equipment in and out of service as needed
• Always follow Lock Out/Tag Out procedures
• Report to Senior Operator or higher on duty about
process conditions
• Report all irregularities to Senior Operator or higher on duty • Share field observations with fellow operators
• Complete daily maintenance tasks
• Fill out electronic logbook; include date, full first name and last name initial, what equipment is in use, not in use, what changes were made, what was done in the
area. Note actions taken for critical alarms.

Phase II
48 #1..
- 264 -
Senior Plant Operator Duties and Expectations
Duties
• Correct unsafe working practices immediately • Work with the Operations Supervisor to minimize disruptions to daily wastewater processing while achieving desired preventive and corrective maintenance goals • Confirm less-experienced operators understand process goals and objectives
• Ensure control action is taken when needed to meet
process targets
• Support process operations coordination with maintenance work
• Identify documentation needs and support changes
• Advise Operations Supervisor of all irregularities
• Support training needs and methods to develop a wellrounded Operations staff • Enter observations, review operator entries and submit entire log at the end of shift • Give turnover to the next shift Expectations
• Make certain all workers – City or contractor - are working safely
• Support Plant Operators while conducting their duties.

Provide guidance and refresher training as needed, • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other treatment processes
• Monitor equipment setpoints to ensure units are operating at target setpoints to achieve required performance
• Ensure corrective action is taken when needed
• Provide equipment isolation and restart timing and
procedures
• Always follow Lock Out/Tag Out procedures
• Develop and maintain appropriate SOPs
• Evaluate control systems screens, trending, and data to optimize processes and operating costs
Phase II
49 #1..
- 265 -
Plant Operations Supervisor Duties and Expectations
Duties
• Manage and supervise process operations • Follow up on Plant Operator’s completion of duties • Initiate adjustments as needed. Provide oversight for process adjustments to maintain permit compliance
• Provide guidance to achieve production and optimization goals while minimizing operating and maintenance costs
• Visually observe all process units a minimum of once/shift • Review operational reports and SCADA trends daily to keep up on process performance
• Ensure control action is taken when needed to meet process targets
• Visually observe all process units a minimum of once per day • Review work order backlog and adjust work efforts as required • Discuss delays in or disruptions from maintenance work with Maintenance counterparts • Advise Operations Superintendent of all irregularities • Coordinate training activities and programs
• Evaluate operator performance
Expectations
• Make certain all workers – City or contractor - are working safely
• Monitor plant operators while conducting their duties.

Provide guidance and refresher training as needed. • Coordinate production with maintenance requirements • Monitor flows and loads and make equipment changes as needed • Coordinate changes and adjustments with other treatment processes
• Monitor equipment setpoints to ensure units are operating at target setpoints to achieve required performance
• Ensure corrective action is taken when needed
• Provide equipment isolation and restart timing and
procedures
• Always follow Lock Out/Tag Out procedures
• Develop and provide contingency plans
• Develop and maintain appropriate SOPs
• Confirm control systems screens, trending, and data
consistently reflect field conditions
Phase II
50 #1..
- 266 -
Operations Superintendent Duties and Expectations
Duties
• Determine compliance requirements • Direct optimization efforts • Work with the Maintenance Superintendent to minimize
disruptions to daily wastewater processing while achieving desired preventive and corrective maintenance goals • Establish process goals and objectives • Predict expected flows and loads • Track actual flows and loads and recommend optimization actions
• Establish boundary limits for contingency plan actions • Review process sampling needs and data reporting
requirements every six months
• Identify documentation needs and changes
• Direct control system quality and upgrades
• Establish training needs and methods for each tier of Operations staff
Expectations
• Make certain all workers – City or contractor - are working safely
• Provide oversight to ensure Directives are met • Use analysis tools where appropriate to optimize daily operation and determine corrective response actions
• Compare unit performance data to expectations, then
provide feedback to the Operations staff with
recommendations as needed
• Maintain e-based trending compliance and performance
measurements
• Maintain the online O&M Manual • Confirm Plant Operations Supervisors are making process control actions that align with desired results
• Provide equipment isolation and restart timing and
procedures
• Confirm that the Lock Out/Tag Out policy is enforced
• Guide development of contingency plans
• Guide development of appropriate SOPs
• Direct training and skills measurement
Phase II
51 #1..
- 267 -

CITY OF MODESTO

COMMITTEE AGENDA REPORT
DATE OF MEETING:

January 22, 2025
Date: December 23, 2024
TO: Economic Development Committee
Eric Alvarez, Chair
Sue Zwahlen, Vice Chair
Nick Bavaro, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: Toby Wells, Director of Engineering Services/City Engineer SUBJECT: Scenic Drive Phase II, Dry Creek Trail Phase II, Kansas Avenue, & Neighborhood Traffic Calming Program Cycle I
CONTACT: Michael Sacuskie, Assistant City Engineer, [email protected], (209) 571-5552
DESCRIPTION:

Consider the Plans and Specifications for the Scenic Drive Phase II, Dry Creek Trail Phase II, Kansas Avenue, & Neighborhood Traffic Calming Program Cycle I Project, accepting the Bid and Awarding a Contract to Bay Cities Paving & Grading, Inc., of Concord, CA, for a total amount not to exceed $13,551,894; and approving an Agreement with TRC Engineers, Inc., of Lathrop, CA for Construction Management Services, Inspection and Materials Testing Services for a total amount not to exceed $957,577 and forwarding to Council for approval. (Funding Source: Local Measure L Funds)
STRATEGIC PLAN ELEMENT:

The recommended action is consistent with the City of Modesto 2020-2025 Strategic Plan Goal D, Ensure Safe, Efficient, and Reliable Infrastructure.

BACKGROUND:

This project will provide pavement rehabilitation on Scenic Drive between Bodem Street and Oakdale Road including roadway resurfacing, new signage and striping, Americans with Disabilities Act (ADA) upgrades at intersections, and storm drainage and street lighting improvements. The pavement rehabilitation on Orangeburg Avenue between Coffee Road and McHenry Avenue will include roadway resurfacing, new signage and striping, storm drainage improvements, and ADA upgrades. The Dry Creek Trail Phase II project will provide a bicycle path asphalt overlay, install new signage and striping, and improve bicycle path lighting. On Kansas Avenue, between Carpenter Road and Morse Avenue, the work will include pavement rehabilitation, new striping, and ADA improvements at needed intersections. The Neighborhood #2..
- 268 -
Economic Development Committee, January 22, 2025
Scenic Drive Phase II, Dry Creek Trail Phase II, Kansas Avenue, & Neighborhood Traffic Calming Cycle I

Page 2 of 4 ends
← All documents from this meeting