On September 28, 2021, by Resolution No. 2021-378, Council approved a Sole Source Purchase Agreement with Muniquip for Wemco/Hidrostal pump parts and electrical components, for a two-year Agreement with three one-year extension options, for an annual estimated amount of $16,000, and a total amount not to exceed $80,000, over five-years, and authorizing the Purchasing Manager, or her designee, the ability to add parts based on the department’s needs, ensuring the total amount does not exceed the authorized total.
DISCUSSION:
On February 23, 2026, the City Manager authorized the Utilities Department to solicit procurement for Wemco/Hidrostal pumps, pump parts and electrical components. The agreement will provide the pumps and pump components necessary to support the continued operation, maintenance, and reliability of the City’s wastewater collection system. These pumps and pump components are utilized in Hidrostal submersible slide rail pumps located throughout the City’s infrastructure and include pumps, pump rebuild kits, impellers, mechanical seals, electrical components, power cords, suction bells, slide rail brackets, slide rail bases, and other critical replacement parts.
Additionally, the need for replacement parts for these pumps has increased since the last agreement was in place. To avoid significantly higher costs associated with complete pump replacement, staff utilizes rebuild kits and replacement components as part of its preventative, predictive, and corrective maintenance program. As the equipment continues to age, timely access to these components is essential to extend equipment life, minimize emergency repairs and downtime, maintain system reliability, and reduce the risk of costly pump failures.
Modesto Municipal Code Section 8-3.203 generally requires all purchases, which meet or exceed $100,000 for material, equipment, or contractual services to follow formal bid procedures. However, MMC 8-3.204(b) provides that a purchase may be exempted from the City’s formal bidding requirement where the Purchasing Agency’s requirements can be met solely by a single article or process. Therefore, staff recommends the purchase of Wemco/Hidrostal pump parts and/or electrical components from Muniquip LLC should be exempt from the formal bidding procedures in accordance with Modesto Municipal Code 8-3.204(b) since Muniquip LLC is the exclusive authorized representative for Hidrostal Pumps and parts.
FISCAL IMPACT:
Expenditure over the past five (5) years for pump parts and electrical components under the previous agreement are listed below:
#3..
- 201 -
Economic Development Committee, August 3, 2026
Agreement with Muniquip LLC for Wemco/Hidrostal Pump Parts and/or Electrical Components
PREVIOUS AGREEMENT EXPENDITURES:
Agreement Year Sub Total
Year 1 (2021-22) $ 29,280
Year 2 (2022-23) $ 10,116
Year 3 (2023-24) $ 8,967
Year 4 (2024-25) $ 12,396
Year 5 (2025-26) $ 13,726
TOTAL $ 74,485
Some of our larger pumps are over $100k to replace. Out of concern that it would have caused staff to exceed the Council approved Agreement amount, the purchase of pumps was not included in the previous 5-year Annual Agreement but were purchased as needed with a Standalone Purchase Order. However, staff would like to add the ability to purchase pumps in the new 5-year Agreement and have increased the new Agreement amount since staff could easily exceed an annual estimated amount of $150k a year if multiple failures occur at the same time. Below is the past five (5) year expenditure for pumps that was not included in the Agreement and the total combined between Standalone Purchased Orders Expenditures and the Previous Agreement Expenditures.
PREVIOUS STANDALONE PO EXPENDITURES:
Agreement Year Sub Total
Year 1 (2021-22) $124,941
Year 2 (2022-23) $27,049
Year 3 (2023-24) $199,910
Year 4 (2024-25) $65,809
Year 5 (2025-26) $13,995
TOTAL $431,704
TOTAL COMBINED $506,189
ANTICIPATED AGREEMENT EXPENDITURES:
The table below contains projected spending for the next five years, with years one and two fixed. The overall agreement total was calculated by forecasting the Consumer Price Index (CPI) percentage increases based on average of the CPI index over the last twelve (12) months. City staff project annual increases based on this estimated forecast. Annual increases will be calculated using the current CPI index at the time of the requested increase. Additionally, the Wastewater Division will have two (2) new pump stations that will be going into operation and will need to be covered by this agreement.
CY 1 CY2 CY3 CY4 CY5 NTE
Estimated Annual $150,000 $150,000 $150,000 $158,700 $167,905
5.8% CPI Increase 0 0 $8,700 $9,205 $9,738
#3..
- 202 -
Economic Development Committee, August 3, 2026
Agreement with Muniquip LLC for Wemco/Hidrostal Pump Parts and/or Electrical Components
Totals $150,000 $150,000 $158,700 $167,905 $177,643 $804,248 CEQA/NEPA REQUIREMENTS:
This item does not constitute a “project” within the meaning of California Environmental Quality Act (CEQA) Guidelines Section 15378 and requires no environmental review.
RECOMMENDED COMMITTEE ACTION:
Staff Recommendations:
Motion recommending a Sole Source Agreement with Muniquip LLC., Roseville, CA, for Wemco/Hidrostal pumps, parts and electrical components, for a two (2) year Agreement with three (3) one-year extension options, for an annual estimated amount of $150,000, and a total amount not to exceed $804,248, over five (5) years, and authorizing the Director of Finance, or her designee, the ability to add parts based on the department’s needs, ensuring the total amount does not exceed the authorized total, and forwarding to Council for approval.
Approved by:
William Wong, Director of Utilities
Joseph P. Lopez, City Manager
Attachments:
1. Agreement
2. Exhibit B – Pricing
3. Financial Interest Disclosure
4. CA Levine Act
5. Bid Waiver
#3..
- 203 -
1 ANNUAL PURCHASE AGREEMENT
PURCHASE AGREEMENT FOR WEMCO/HIDROSTAL PUMP AND PARTS - AGREEMENT #323140
This agreement, hereinafter called AGREEMENT, made and entered into in the City of Modesto, State of California, this _______ day of ________________, 2026, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter called CITY, and MuniQuip, LLC, a California limited liability company, hereinafter called VENDOR, WHEREAS, the Modesto City Council adopted Resolution No. 2026- ______ authorizing the Award of agreement for the Purchase of Wemco/Hidrostal Pumps and Parts materials, supplies or equipment described herein (the “GOODS”) to VENDOR, attached hereto as Exhibit “A” and made a part hereof, and
WHEREAS, the VENDOR is the sole authorized Hidrostal representative for municipal pumps in California, and
WHEREAS, the CITY and VENDOR shall enter into an agreement for the Purchase of Wemco/Hidrostal Pumps and Parts as described in the Pricing Schedule, attached hereto as Exhibit “B” and made a part hereof, and
NOW, THEREFORE, the parties hereto mutually agree as follows:
1. TERM OF AGREEMENT:
The term of the AGREEMENT shall be for a period of two (2) years, with three (3) one-year extension options at the sole discretion of City, for a total of up to five (5) years.
Year 1: OCTOBER 01, 2026 through SEPTEMBER 30, 2027
Year 2: OCTOBER 01, 2027 through SEPTEMBER 30, 2028
Year 3: OCTOBER 01, 2028 through SEPTEMBER 30, 2029
Year 4: OCTOBER 01, 2029 through SEPTEMBER 30, 2030
#3..
- 204 -
2 Year 5: OCTOBER 01, 2030 through SEPTEMBER 30, 2031
2. PRICING:
A. Per the aforementioned Council Resolution, the annual estimated amount of the AGREEMENT is $150,000. The total amount paid by CITY to VENDOR over the full term of the AGREEMENT shall not exceed $804,248.
B. The AGREEMENT pricing is attached hereto as Exhibit B. Pricing during AGREEMENT Year one and two shall be as set forth in Exhibit B, attached hereto and made a part hereof by this reference.
C. The CITY and VENDOR may agree to update the products and prices contained in Exhibit B to add, remove, or substitute items, or change pricing. All changes shall be in writing and approved by the Finance Director.
D. Pricing shall remain firm for the first two (2) years of the AGREEMENT.
E. Price increases for each subsequent AGREEMENT years three, four, and five, shall be negotiated in good faith by the parties, but in no instance may exceed the net percentage increase during the prior 12-month period in the Federal Bureau of Labor Statistics’ Consumer Price Index (CPI) for West Urban Area. Requests for price increases in any renewal year shall be submitted by VENDOR in writing at least ninety (90) days prior to the annual anniversary date of the AGREEMENT.
3. USAGE:
Vendor shall provide whatever quantities may be required during the term of this Agreement. No minimum or maximum quantities are guaranteed or implied by CITY.
4. ORDERING:
Vendor shall deliver GOODS to the location specified within CITY’s purchase order. Unless specified by the Purchasing Division, no GOODS may be delivered to CITY unless a purchase order has been provided by CITY to VENDOR.
5. PAYMENT:
All invoices shall be paid in full by CITY after completion and acceptance of the GOODS by the City, and receipt of a properly prepared invoice submitted by VENDOR via email to [email protected]. As specified by the Purchasing Division, every invoice must reference this AGREEMENT number or CITY’s purchase order number. VENDOR will be paid by CITY via Net 30 terms via CITY's ePay Program.
6. AMENDMENTS:
No changes to this AGREEMENT shall be effective unless documented by a written amendment to this AGREEMENT and signed by the parties hereto with CITY represented by the Purchasing Division. #3..
- 205 -
3 7. TERMINATION:
A. In the event either party fails to perform under this AGREEMENT or breaches any condition contained herein, the other party shall notify in writing the breaching party of the non-performance.
Within thirty (30) days after receipt of notification, the breaching party shall correct any nonperformance to the reasonable satisfaction of the non-breaching party. Failure to correct any nonperformance shall allow the non-breaching party to terminate this AGREEMENT for cause.
B. CITY may terminate this AGREEMENT for convenience upon thirty (30) days prior notice to VENDOR by CITY’s authorized employee.
8. INSPECTION:
All GOODS are subject to inspection and testing by the CITY for compliance with specifications as included herein, within a reasonable time after delivery. In the event GOODS are defective or not in conformity with this AGREEMENT or CITY’s purchase order, the CITY shall have the right to either reject the GOODS or require correction. Defective articles or services shall be removed from CITY premises and/or corrected by and at the expense of VENDOR; provided that should the VENDOR fail, neglect or refuse to do so, the CITY shall thereupon have the right to purchase in the open market, in lieu thereof, a corresponding quantity of any such items. CITY may deduct from any moneys due or that may there after coming due to VENDOR or send an invoice to the VENDOR which shall be paid within thirty (30) days, the difference between the prices named in the contract or purchase order and the actual cost thereof to the CITY. In the event that the VENDOR fails to make prompt delivery as specified for any item, the same conditions as to the rights of the CITY to purchase in the open market and to reimbursement set forth above shall apply, except when delivery is delayed by fire, strike, freight embargo, or Act of God or the government. Cost of inspection or deliveries or offers for delivery, which do not meet specifications, will be borne by the Bidder. Failure by CITY to inspect and accept or reject shall not relieve the VENDOR from responsibility for compliance with specifications. Final acceptance shall be conclusive except as regards to latent defects, fraud, or such gross mistakes as amount to fraud.
9. RESPONSIBILITY:
Unless otherwise specified, the VENDOR shall be responsible for all GOODS until delivered at CITY’s designated delivery point and shall bear all risks as to items rejected or requiring correction after notice of such rejection or correction is given.
10. SHIPMENT:
Unless otherwise authorized by CITY’s Purchasing Division, GOODS shall be delivered F.O.B.
Destination Freight Prepaid and Included in Price of GOODS. VENDOR may not collect freight collect or charge shipping expenses otherwise to CITY. Original receipted freight bill must accompany the invoice. Shipment must be made within the time stated on Purchase Order, failing which CITY reserves the right to purchase elsewhere and charge VENDOR with any loss incurred, unless delay in making shipment is due to unforeseeable causes beyond the control and without the fault or negligence of VENDOR.
#3..
- 206 -
4 11. CHANGES:
The AGREEMENT or purchase order may at any time, by written order of the CITY, be changed in regard to the GOODS to be furnished, quantities ordered, unit price, discount, delivery point or arrangements, terms or any other matters affecting a valid purchase order or AGREEMENT. In the event such change causes an increase or decrease in the cost of performance hereunder, and equitable adjustment will be made for the cost thereof, subject to the approval of the Purchasing Manager, and written notice given, therefore.
12. WARRANTY:
Notwithstanding any other provisions of the purchase order, VENDOR warranties for the GOODS shall extend for 90 days after delivery thereof to CITY, shall meet or exceed all original manufacturer warranties, and that GOODS shall be of the most suitable grade as specified in this AGREEMENT, VENDOR’s own marketing materials and in the purchase order. Moreover, VENDOR warrants and represents that GOODS shall comply with warranties of merchantability and fitness for a particular purpose. If a defect is discovered in any GOODS covered in this AGREEMENT, VENDOR shall correct at its expense, including transportation/freight, such defects as are reported within one year of final acceptance.
13. INSURANCE:
Any AGREEMENT or purchase order where work, maintenance, or service is performed on CITY property requires appropriate insurance. VENDOR shall ensure proper insurance certificates are on file with the CITY prior to performing onsite work. Contact CITY’s Purchasing Division to verify the type of insurance required.
14. TAX EXEMPTIONS:
The CITY is exempt from payment of federal excise tax. All invoices shall be exclusive of such excise tax. Moreover, if the CITY’s purchase is not subject to sales tax, the statement for resale will appear in the body of the purchase order.
15. INDEMNITIES:
A. VENDOR agrees to protect, indemnify and save harmless CITY and its agents, officers, employees, and volunteers from any claim, loss or damage from VENDOR’s, or the GOODs’, infringement of trademarks, patents, copyrights and unfair competition action with to any third party.
B. VENDOR shall hold the CITY and its agents, officers, employees, and volunteers, harmless from and save, defend and indemnify them against any and all claims, losses, liabilities, judgments or damages from every cause, including but not limited to injury to person or property or wrongful death, including reasonable costs and expenses of defense of any judicial or administrative action, arising directly or indirectly out of any negligent or intentional act or omission of VENDOR, or its agents, officers, employees, or subcontractors relating to or during the performance of its obligations under this AGREEMENT, except for claims arising from the willful or active #3..
- 207 -
5 negligence of the CITY. VENDOR’s obligation to defend, indemnify, and hold the city, its agents, officers, and employees harmless under the provisions of this paragraph is not limited to or restricted by any requirement for VENDOR to procure and maintain a policy of insurance VENDOR.
16. GOVERNING LAW:
This AGREEMENT shall be deemed made in, governed by, performed in, and construed and enforced in accordance with the laws of the State of California, U.S.A., without giving effect to its conflicts of law provisions or principles.
17. VENUE:
Venue for any dispute or claim arising or related to this AGREEMENT its performance, breach, or interpretation (including issues about its validity or enforceability), shall be exclusively in the Superior Court of Stanislaus County or the United States District Court for the Eastern District of California.
18. ATTORNEY'S FEES:
If a party to this AGREEMENT brings any action, including an action for declaratory relief, to enforce or interpret the provision of this AGREEMENT, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.
19. LIMITATION OF LIABILITY:
The CITY shall not be responsible for any damage that may accrue by reason of the death or injury of the person of the VENDOR’s officers, agents, employees, invitees, or licensees, or be set up at any time because of personal injury or damage to property sustained by any other person or persons, which may have been caused or contributed to, approximately or remotely, by reason of or in the course of performance of the AGREEMENT. The VENDOR shall assume full responsibility for the defense of any claims arising under the AGREEMENT and the VENDOR shall save, keep, and bear harmless the CITY, all officers and employees thereof, from all damages, costs, or expenses because of personal injury or property damage based on the performance of this AGREEMENT or asserted against it.
20. NOTICES:
Any notice, payment or instrument required or permitted by this AGREEMENT to be given or delivered to either party shall be deemed to have been received when personally delivered, or one calendar week following deposit of the same in any United States Post Office, registered or certified mail, postage prepaid, addressed as follows:
#3..
- 208 -
6 VENDOR: MuniQuip, LLC
Attention: Taylor Hansell
2024 Opportunity Drive
Roseville, CA 95378
(916) 787-5641
[email protected]
CITY: City of Modesto
Purchasing Division
Attention: Jeff Daniels
P.O. Box 642
Modesto, CA 95353
(209) 577-5405 [email protected]
Each party may change its address for delivery of notice by delivering written notice of such change of address to the other party.
21. ASSIGNMENT:
Neither this AGREEMENT nor any portion hereof shall be subcontracted or assigned without the written consent of the CITY in each and every instance.
22. MISCELLANEOUS:
Time is of the essence in each and every provision of this AGREEMENT.
23. ENTIRE AGREEMENT:
This AGREEMENT and its exhibits contain the entire understanding between VENDOR and CITY.
Additional or new terms contained in this AGREEMENT which vary from VENDOR’S bid are controlling and are deemed accepted by VENDOR by provision of any GOODS or other commencement of performance hereunder. The terms and conditions of the Pricing Schedule, attached hereto as Exhibit B, are incorporated herein. In the event of a conflict between the Pricing Schedule and this AGREEMENT, this AGREEMENT shall control. All previous bids, offers and communications relative to this AGREEMENT, whether oral or written, are hereby superseded except to the extent that they have been incorporated into this AGREEMENT. No future waiver or exception to any of the terms, conditions, and provisions of this AGREEMENT shall be considered valid unless specifically agreed to in writing by the parties.
24. PARTIAL INVALIDITY:
If any provision in this AGREEMENT is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force without being impaired or invalidated in any way.
#3..
- 209 -
7 IN WITNESS WHEREOF, the CITY OF MODESTO, a municipal corporation, has authorized the execution of this AGREEMENT by its Director of Finance under authority of Resolution No. 2026 -____ adopted by the Council of the City of Modesto on the 25th day of August, 2026 and MuniQuip, LLC, has caused this Agreement to be duly executed.
#3..
- 210 -
Pump
Station
Model-Serial-Manuf. GPM Suct Disc HP V RPM Head
Rebuild
kit # Notes
2026/2027
Bare Motor
Only Pricing
2026/2027
Tariff Adder
1992 Athens Hidrostal Model E5K-L-EK3A6- MXAY2A1-13 Serial#9211452-5-6 250 4 6" 4.1 240 1150 20 GR E5K-L4R+EEYY6 (EK3A6 Motor Obsolete) $ 28,239.67 $ 2,521.401999 California Hidrostal Model EK5-LL-EKXA6- MYAK-XBA1-10 Serial 99x21592 400 400 56 4.1 4.1 240 1200 22 GR E5K-LL4R+EEYY6 (EKXA6 Motor Obsolete) $ 28,239.67 $ 2,521.401974 Carver &
Standiford
Hidrostal Model D4K-S-DKXA6-
MYAK-XAA1-10 Serial 09dw07779-
01 400 400
4 4 4
4.1 4.1
240
1200 1200
15 D4K-S4+DKXA6 23,209.91 $ $ 2,072.31
1992
Coldwell & N
Olive
Hidrostal D4K-LT-DK2X6-MXAY2A1-13 Serial 9211452-1 200 200 4 4 4 4 2.8 240 0 1200 1200 25 GR D4K-LT4+DEYR6 (DK2X6 Motor Obsolete) $ 22,751.20 $ 2,031.36 1995 College & Ashford Ct Hidrostal Model D4K-H5-DK3A4- MXAK-Y2C3-10 Serial 9411814-1 680 4 4 12.2 240 1750 25 GR D4K-HS4+DEXK4 (DK3A4 Motor Obsolete) $ 26,229.35 $ 2,341.911995 College & Orangeburg Hidrostal Model D4K-LT-DKXA6- MXAK-Y2A1-10 Serial 13DW09717- 01 226 4 4 2..8 240 1150 15 GR 6959380 D4K-LT4+DKXA6 23,209.91 $ $ 2,072.311992 El Torino &
Fairmont
Hidrostal Model D4K-LT-DK2X6-
MXAY2A1-10 Serial 9211452-4 220 4 4 2..8 240 1150 17 D4K-LT4+DEYR6 (DK2X6 Motor Obsolete) $ 22,751.20 $ 2,031.36 1994 Codoni Hidrostal D4K-LT-DEYR4-MIAK1FG 870
870
6 6
8 8
15 15
480
0 1170 45 GR D4K-LT4+DEYR4 23,104.61 $ $ 2,062.91
Emerald
Hidrostal Model F10-HD-FE4A6
Serial 13dw09608-02, Immersible
motor, 30HP, 1200rpm motor, 50'
cable, 460V
1700 10 10 30 460 1150 20 YES 9731084 F10K-HD4/5R+FE4A6 (SS Impeller, HC Liner) $ 62,349.67 $ 5,566.93 1996 Evergreen &
Gay
Hidrostal Model D4K-LT-DK2X6-
MXAK-Y2A1-10 Serial 9411819-3 240 4 4 2..8 240 1150 17 GR 6195566 D4K-LT4+DEYR6 (DK2X6 Motor Obsolete) $ 22,751.20 $ 2,031.36 2016 Hahn Hidrostal Modesl E5K-LS4R+EEXP4-
MYAK1+XC1A6MM-25
900 6
5 5
17.6 240 1730 38 GR 9675310 E5K-LS4R+EEXP4 34,990.77 $ $ 3,124.18 1995 Hatch & Dallas Hidrostal Modesl D4K-5DK-3A6- MXAk-Y2A1-10 Serial 9411814-3 263 4 4 4.1 240 1150 0 22 GR D4K-S4+DKXA6 (DK3A6 Motor Obsolete) $ 23,209.91 $ 2,072.312016 Mark Randy Hidrostal D4K-LT-DK2R8-MXAK- Y2A1-10 300 4 4 5 208 1163 18 GR D4K-LT4+DKXA6 CAP
Motor @ 1545 rpm
(DK2R8 Motor Obsolete)
$ 23,209.91 $ 2,072.31
Const.
Date
Motor
Backup*
KW/
QC/GR
#3..
- 211 -
Pump
Station
Model-Serial-Manuf. GPM Suct Disc HP V RPM Head
Rebuild
kit # Notes
2026/2027
Bare Motor
Only Pricing
2026/2027
Tariff Adder
Const.
Date
Motor
Backup*
KW/
QC/GR
1994 Maze & Spencer Hidrosta Model D4K-LT-2R2X6- MXAK-Y2A1-10 Serial 9311711-5 170 4 4 4 4 2.8 2.8 240 1150 1150 20 GR D4K-LT4+DKXA6 (2R2X6 Motor Obsolete) $ 23,209.91 $ 2,072.311994 Muriel Hidrostal Model D4K-LT-DK2X6- MXAK-Y2A1-10 Serial 9311711-3 177 177 4 4 4 4 2.8 2.8 240 1150 1150 21 GR 6195566 D4K-LT4+DKYY6 (DK2X6 Motor Obsolete) $ 23,209.91 $ 2,072.312000 Northgate Hidrostal Model D4K-LT-DKYX6- MYAK-XAA1-10 Serial 99X21276 242 4 4 2.1 240 1138 1138 18 GR D4K-LT4+DKYY6 CAP
Motor @ 1271 rpm
(DKYX6 Motor Obsolete)
$ 23,209.91 $ 2,072.31
2008 Rose & Celeste
Hidrostal F6K-L-FEX6 SN
05DW05808 Motor FEXZ6-MYAKXBC3-22
1000 1000
8 8
6 6
16.6 460 1160 24 Yes 4152997
F6K-M4R+FEXW6 (F6K-L
Obsolete, FEXZ6 Motor
Obsolete)
$ 45,294.45 $ 4,044.15
2016 Rumble F6K Hidrosal F6KH4R+FE4A6-MYAK+XC1A4MM-25 1400 8 8 6 6 21 240 1160 30 GR F6K-H4R+FE4A6 55,524.58 $ $ 4,957.552014 Scenic Hidrostal Model A2QS-MM5+AA1-
10-HE5B8-XYSK-XDIA6MM-16
Serial 14DW09804-01
4100 2800
12 10
12 18
36 36
460 460
900 800
23 Yes 6589115 H12K-SS4/5R+HE5B8 106,628.40 $ 9,520.39 $ 1996
1000
Oaks/Johnny
Creek
Hidrostal Model D4K-HS-DK3A6-
MXAK-Y2A1-10 Serial 9411833 240 4 4 4.1 240 1150 16 pump b/p D4K-HS4+DEYR6 (DK3A6 Motor Obsolete) $ 22,751.20 $ 2,031.36 2016 Torrid & Diable D4K-HS-DEXK4-MYAK 600 4 4 15 240 1750 18 GR D4K-HS4+DEXK4 26,229.35 $ $ 2,341.912024 Trask & Encina D4K-LT-DK2X6-MXAK-Y2A1-10 SN S017227
235 4 3.4 240 1160 17 D4K-LT4+DKXA6 (DK2X6 Motor Obsolete) $ 23,209.91 $ 2,072.31 1995 Trask & Encina Hidrostal Model D4K-LT-DK2X6 Serial 9411819-1 235 4 4 2..8 240 1150 17 GR D4K-LT4+DKXA6 (DK2X6 Motor Obsolete) $ 23,209.91 $ 2,072.311994 Tully & Briggsford Hidrostal Model E5K-LL-EE3A4- MXAK-Y2C4-10 Serial 9411738-2 1150 5 4 15..4 240 1750 36 GR 9852065 E5K-LL4R+EEXP4 (EE3A4 Motor Obsolete) $ 34,990.77 $ 3,124.18 2000R Tully & Davis
Hidrostal Model D4K-LT-DKYY6-
2.1HP, 3 PH, 230V, 1160RPM Serial
99X22382
225 225
4 4 4 4
2.1 2.1
240 0
1160 1160
19 GR 6946547 D4K-LT4+DKYY6 23,209.91 $ $ 2,072.31
#3..
- 212 -
Pump
Station
Model-Serial-Manuf. GPM Suct Disc HP V RPM Head
Rebuild
kit # Notes
2026/2027
Bare Motor
Only Pricing
2026/2027
Tariff Adder
Const.
Date
Motor
Backup*
KW/
QC/GR
1969 Woodland
Hidrostal Model H12K-HD-H4W25HP-TFC-Bearing Frame Rexa Coupling Viva 215, Baldor Motor
Catalog #12F904Y477G2, 326 T
Frame Serial 99X21018
2000 3500 4500 4500 4500
14 16 16 16 16
14 18
8 16 16
50 50
25 25
25 480
0 0
0 0
0 0
880 880 880
15 YES 4122162
H12K-HD4/5R+H4M 25
Hp, 890 rpm WEG Motor
(SS Impeller, HC Liner)
$ 92,015.60 $ 8,215.68
2010R Jefferson St
Hidrostal Model f10-HD-FE4A6-
MYAKXD1A6I-16-BEHS Serial
09DW07564-01
1400 1400
6 6
6 6
20 20 240 0
1170 1170
21 GR
200 AMP
F10K-HD4/5R+FE4A6 (SS
Impeller, HC Liner) $ 62,349.66 $ 5,566.93
2010
Coffee &
Claratina
Hidrostal Model E5K-LL-EEXK4-
MYAK-XBC4-10 Serial 09DW07564-
03 1200 6 5 15.4 460 1750 38 GR 9675310 E5K-LL4R+EEXK4 34,773.84 $ $ 3,104.81 2015 Parklawn Hidrostal Model D4K-LT-DKXA4 serial 14DW10029-01 240 4 4 5 460 1800 GR 6959380 D4K-LT4+DKXK4 (DKXA4 Motor Obsolete) $ 28,691.25 $ 2,561.722026 Shacleford Hidrosral H12KMDHE5-S6XIWK1FCS 2431 12 12 66 460 1200 51 HE5S6 Motor 80,248.57 $ $ 7,165.052028 Rivertrunk Hidrostal I10KS-IETZ6-XYWK-1FCSXE1E8VA-25 4MGD 10 10 268 460 1200 150 I10K-S4/5R+IETZ6 246,797.78 $ 22,035.52 $ #3..
- 213 -
Major
Rebuild
kits
Part No.
Motor Codes QTY Station Station Motor Code 2026-2027
9852065 EE3A4-MYAK EE3A6-MYAK Athens EK3A6 1,825.15 $
EEXA4-MYAK EEXA6-MYAK EEXR4-MYAK EEXR6-MYAK Tully Briggsmore EE3A4 1,825.15 $ EEXR8-MYAK EK3A4-MYAK EK3A6-MYAK EKXA4-MYAK Coffee EEXA4 1,825.15 $ EKXA6-MYAK, EE3S4-MYAK, ENXA6-MYAK, ENXA8-MYAK California EKXA6 1,825.15 $ JB POS Rebuild Kit - Parts Itemized -$
5937732 161 Disc Spring 100x57x2.7MM 1 62.11$
3507217 209 O-RING - NITRILE 1 5.60$
6817142 411 Shim M12x4.5mm SS316 8 123.92$
9537807 513 Single Row Deep Groove Ball Bearing 1 17.09$ 6213616 513b Wavy Washer 71/61x0.4MM 1 5.97$ 8332724 514 Angular Contact Ball Bearing 1 157.14$ 1691209 515 Mechanical Seal M-TYPE 1 1/2" SC/TC 1 $ 1,559.394076695 516 Mechanical Seal G-B 1 1/2" SC/C 1 360.81$ 8866488 524 O-RING - NITRILE 1 3.04$ 7468772 525 O-RING - NITRILE 1 1.19$ 4993166 526 Ring Rolled Motor Size 3, 6x241MM SS420 1 29.85$ 5557427 526 O-RING - NITRILE 1 12.47$
3173123 527 O-RING - NITRILE 1 8.52$ 8708871 529 O-RING - NITRILE 1 4.85$ 3127806 530 O-RING - NITRILE 1 5.97$ 1947437 536a-e SEALING RING 13X18X2MM COPPER 4 2.27$ 4541778 545 SNAP RING (SEEGER) A38 1 0.55$ 2410860 559 SPRING RING MOTOR SIZE 3, 10/5X242MM STEEL 1 44.75$ 3906318 559 SNAP RING (SEEGER) A38 STAINLESS STEEL 1 0.55$ -$
Part number Motor Codes QTY Station Station Motor Code
6959380 DE3A4-MYAK DE3A6-MYAK College Ashford DE3A4 1,319.73 $ DEXA4-MYAK DEXA6-MYAK DEXB2-MYAK DEXK2-MYAK College Orangeburg DKXA6 1,319.73 $ DEXK4-MYAK DK3A4-MYAK DK3A6-MYAK DKXA4-MYAK 1000 Oak/Johnny Creek DE3A4 1,319.73 $ DKXA6-MYAK Carver Standiford DKXA6 1,319.73 $
Hatch Dallas DK3A6 1,319.73 $
Torrid Diablo DEXK4 1,319.73 $
Tully Davis DKXA6/ DKYY6 1,319.73 $
Mark Randy DKXA6 1,319.73 $
Paraklawn DKXA4 1,319.73 $
POS Rebuild Kit - Parts Itemized -$
5937732 161 DISC SPRING 1 62.11$ 2853799 209 O-RING - NITRILE 1 4.98$ 8816519 411 SHIMS 8 74.93$ 9537807 513 SINGLE ROW DEEP GROOVE BALL BEARING 1 17.09$ City of Modesto Multi-year Annual Contract Pricing
#3..
- 214 -
6213616 513b WAVY WASHER 1 5.97$
8332724 514 DOUBLE ROW ANGULAR CONTACT BALL BEARING 1 157.14$ 3290687 515 MECHANICAL SEAL M-TYPE SIZE 1 1/8" 1 918.78$ 4076695 516 MECHANICAL SEAL G-B, 1 1/2" SC/C 1 360.81$ 8866488 524 O-RING - NITRILE 1 3.04$ 9615849 525 O-RING - NITRILE 1 2.04$ 5557427 526 O-RING - NITRILE 1 12.47$ 4993166 526 RING ROLLED MOTOR 1 29.85$ 3173123 527 O-RING - NITRILE 1 8.52$ 8708871 529 O-RING - NITRILE 1 4.85$ 3127806 530 O-RING - NITRILE 1 5.97$ 1947437 536a-e SEALING RING COPPER 3 1.70$
7396683 546 SNAP RING - A28 STAINLESS 1 2.12$ 2410860 559 SPRING RING MOTOR 1 24.56$ 4541778 546 SNAP RING - A28 1 0.55$ 8835710 525 O-RING - NITRILE 1 2.98$
-$
Part number Motor Codes QTY Station Station Motor Code
6195566 DK2R4-MYAK DK2R6-MYAK El Torino Fairmont DK2X6 1,233.43 $ DK2R8-MYAK DK2X4-MYAK DK2X6-MYAK Evergreen Gay DK2X6 1,233.43 $ Trask Encina DK2X6 1,233.43 $
Fairmont DK2X6 1,233.43 $
Maze Spencer DK2X6 1,233.43 $
Muriel DK2X6 1,233.43 $
Coldwell DK2X6 1,233.43 $
POS Rebuild Kit - Parts Itemized -$
2853799 209 O-RING - NITRILE 1 4.98$ 6817142 411 SHIM M12x5.0mm STAINLESS STEEL AISI316 8 123.92$ 8242213 513 SINGLE ROW DEEP GROOVE BALL BEARING 1 46.86$ 2768359 514 DOUBLE ROW ANGULAR CONTACT BALL BEARING 1 125.06$ 3290687 515 MECHANICAL SEAL M 1 1/8" SC/TC 1 918.78$ 2018217 516 MECHANICAL SEAL G-B, 1 1/8'' SC/C 1 265.64$ 9615849 524/530 O-RING - NITRILE 2 4.08$
7468772 525 O-RING - NITRILE 1 1.19$
8866488 527 O-RING - NITRILE 1 3.04$
1947437 536 SEALING RING 13X18X2MM COPPER 2 1.13$
7396683 545 SNAP RING (SEEGER) A28 STAINLESS STEEL 1 2.12$ 9877017 549 O-RING - NITRILE 1 0.51$ 4511944 O-RING - NITRILE 2 3.73$ 9825850 O-RING - NITRILE 1 1.80$ -$ -$
Part number Motor Codes QTY Station Station Motor Code
#3..
- 215 -
4152997 FEXT8-MYAK FEXW6-MYAK Rose Celeste 1 FEXZ6 2,648.63 $ FNXW6-MYAK FEXZ6-MYAK FEXZ8-MYAK FNXZ6-MYAK Rose Celeste 2 FEXZ6 2,648.63 $ FNXZ8-MYAK FE3Z6-MYAK FE3Z8-MYAK -$
POS Rebuild Kit - Parts Itemized -$
2733575 121 ANGULAR CONTACT BALL BEARING 2 402.64$ 7337907 126 SHAFT LOCK NUT 1 18.14$ 6232830 DISC SPRING 1 41.53$ 2843763 209 O-RING - NITRILE 1 13.88$ 8220712 411 SHIM M16x5.0mm THICK STAINLESS STEEL 8 92.85$ 6213616 513 WAVY WASHER 1 5.97$ 9537807 513 SINGLE ROW DEEP GROOVE BALL BEARING 1 17.09$ 9276034 515 MECHANICAL SEAL M 2'' SC/TC 1 $ 2,140.266868477 516 MECHANICAL SEAL G-B, 2'' SC/C 1 472.51$ 8866488 524 O-RING - NITRILE 1 3.04$
9615849 525 O-RING - NITRILE 1 2.04$ 7468772 525 O-RING - NITRILE 1 1.19$ 4993166 526 RING ROLLED MOTOR SIZE 3 1 29.85$ 5557427 526 O-RING - NITRILE 1 12.47$ 3173123 527 O-RING - NITRILE 1 8.52$ 8708871 529 O-RING - NITRILE 1 4.85$
3127806 530 O-RING - NITRILE 1 5.97$
1947437 536 SEALING RING COPPER 4 2.27$
6355694 536 SEALING RING COPPER 1 5.97$
4044836 546 SNAP RING (SEEGER) A50 1 2.01$
3135660 545 SNAP RING (SEEGER) A50 STAINLESS STEEL 1 14.50$ 2410860 559 SPRING RING MOTOR SIZE 3 1 24.56$ -$ -$
Part number Motor Codes QTY Station Station Motor Code
9731084 FE4A6-MYAK FE4A7-MYAK FN4A6-MYAK Jefferson FE4A6 2,684.84 $ Emerald FE4A6 2,684.84 $
Rumble FE4A6 2,684.84 $
-$ -$
POS Rebuild Kit - Parts Itemized -$
2733575 121 ANGULAR CONTACT BALL BEARING 2 402.64$ 3714673 127 SHAFT LOCK WASHER MB11 1 3.15$ 2843763 209 O-RING NITRILE 1 13.88$
8220712 411 SHIM M16x5.0mm THICK STAINLESS STEEL AISI316 8 92.85$ 9407457 513 WAVY WASHER 109/99X0.5MM 1 11.95$ 2398833 513 SINGLE ROW DEEP GROOVE BALL BEARING 1 55.08$ 1370170 513 O-RING VITON 1 7.82$
9276034 515 MECHANICAL SEAL M 2'' SC/TC 1 $ 2,140.266868477 516 MECHANICAL SEAL G-B, 2'' SC/C 1 472.51$ 5007561 524 O-RING NITRILE 1 5.97$
#3..
- 216 -
9615849 525 O-RING NITRILE 1 2.04$
4667306 526 RING ROLLED MOTOR SIZE 4, 6X333MM STAINLESS STEEL AISI420 1 47.76$ 6652217 526/529 O-RING NITRILE 2 23.88$
7642861 527 O-RING NITRILE 1 10.71$ 6330658 530 O-RING NITRILE 1 5.97$ 1947437 536 SEALING RING 13X18X2MM COPPER 3 1.69$ 8713100 559 SPRING RING MOTOR SIZE 4, 10/5X334MM STEEL A570 1 47.76$ 5782000 555 OIL SEAL NITRILE 1 17.19$ 4044836 545 SNAP RING (SEEGER) A50 1 2.01$ 3135660 546 SNAP RING (SEEGER) A50 STAINLESS STEEL 1 14.50$ -$ -$
Part number Motor Codes QTY Station Station Motor Code
4122162 H4M Woodland H4M 8,437.64 $
POS Rebuild Kit - Parts Itemized -$
6440117 118/119 CYLINDRICAL ROLLER BEARING 2 $ 2,136.33 2083068 121 ANGULAR CONTACT BALL BEARING 2 $ 1,977.60
2331874 126 SHAFT LOCK NUT KM20 1 63.65$
8872708 127 SHAFT LOCK WASHER MB20 1 25.95$ 6808703 146 O-RING NITRILE 1 4.67$ 6618220 147 O-RING NITRILE 1 3.48$ 3177833 161 SPRING 8X8MM SPRING STEEL AISI9262 8 43.59$ 1387043 162 SNAP RING (SEEGER) A90 1 7.05$ 9897479 164 O-RING NITRILE 1 0.80$ 6317017 209 O-RING NITRILE 1 14.81$ 8220712 411 SHIM M16X5.0MM THICK STAINLESS 8 94.20$ 4970464 515 MECHANICAL SEAL X-D TYPE 3'' SIC/SIC/VITON 1 $ 4,392.088677467 516 MECHANICAL SEAL G-B, 3'' SC/C 1 $ 2,308.38 7642861 527 O-RING NITRILE 1 10.71$ 1947437 536 SEALING RING 13X18X2MM COPPER 3 1.70$ 7754308 545 SNAP RING (SEEGER) A70 1 5.97$ 8433239 546 SNAP RING (SEEGER) A75 1 21.82$ -$ -$
Part number Motor Codes QTY Station Station Motor Code
6851817 REBUILD KIT, TYPE X-D SEAL, HE5B6, HE5B8, HE5S6, HE5C6, HE5T6 Scenic HE5B8 6,560.08 $ -$
Rebuild Kit - Parts Itemized -$
1975566 121 ANGULAR CONTACT BALL BEARING 2 $ 1,400.214196833 127 SHAFT LOCK WASHER MB17 1 5.97$ 6317017 209 O-RING NITRILE 1 14.81$ 8220712 411 SHIM M16x5.0mm THICK STAINLESS STEEL AISI316 8 92.85$ 9233222 513 DISC SPRING 149/106X1.5MM 2 51.19$
#3..
- 217 -
4161192 513 SINGLE ROW DEEP GROOVE BALL BEARING 1 122.58$ 8306291 513 O-RING VITON 1 23.88$
3066784 515 SHIM WASHER 90X77X0.5MM STAINLESS STEEL 1 10.26$ 3984434 515 SHIM WASHER 120/150X0.1MM 1 3.28$ 4970464 515 MECHANICAL SEAL X-D TYPE 3'' SIC/SIC/VITON 1 $ 4,392.08 8677467 516 MECHANICAL SEAL G-B, 3'' SC/C 1 $ 2,308.38
2610644 524 O-RING NITRILE 1 5.36$
9615849 525 O-RING NITRILE 1 2.04$
6052411 526 RING ROLLED MOTOR SIZE 5 1 53.33$
5494030 526 O-RING NITRILE 1 13.22$ 7642861 527 O-RING NITRILE 1 10.71$ 1000181 529 O-RING NITRILE 1 12.93$ 5190675 530 O-RING NITRILE 1 4.06$ 1947437 536 SEALING RING 13X18X2MM COPPER 4 2.27$ 1144105 536 SEALING RING 17X21X1.5MM COPPER 1 0.46$ 7377747 545 SNAP RING (SEEGER) A77 1 8.71$
8433239 546 SNAP RING (SEEGER) A75 STAINLESS STEEL 1 21.82$ 3767687 555 OIL SEAL NITRILE 1 8.76$ 7928311 559 SPRING RING MOTOR SIZE 5 1 41.70$
-$ -$
Part number Motor Codes QTY Station Station Motor Code
9675310 *REVISE* Hahn EEXP4 1,830.14 $
-$
POS Rebuild Kit - Parts Itemized -$
1760909 Shaft Locknut KM9 M45X1.5MM 1 23.88$ 5937732 161 Disc Spring 100x57x2.7MM 1 62.11$ 3507217 209 O-RING - NITRILE 1 5.60$ 6817142 411 Shim M12x4.5mm SS316 8 123.92$ 9537807 513 Single Row Deep Groove Ball Bearing 1 5.97$ 6213616 513b Wavy Washer 71/61x0.4MM 1 17.09$ 8332724 514 Angular Contact Ball Bearing 1 157.14$ 1691209 515 Mechanical Seal M-TYPE 1 1/2" SC/TC 1 $ 1,559.394076695 516 Mechanical Seal G-B 1 1/2" SC/C 1 360.81$ 8866488 524 O-RING - NITRILE 1 3.04$ 7468772 525 O-RING - NITRILE 1 2.04$ 4993166 526 Ring Rolled Motor Size 3, 6x241MM SS420 1 29.85$ 5557427 526 O-RING - NITRILE 1 12.47$ 3173123 527 O-RING - NITRILE 1 8.52$ 8708871 529 O-RING - NITRILE 1 4.85$ 3127806 530 O-RING - NITRILE 1 5.97$ 1947437 536a-e SEALING RING 13X18X2MM COPPER 4 2.27$ 4541778 545 SNAP RING (SEEGER) A38 1 0.55$ 2410860 559 SPRING RING MOTOR SIZE 3, 10/5X242MM STEEL 1 24.56$ $ -
#3..
- 218 -
-$
Part number Motor Codes QTY Station Station Motor Code
6319310 DKYY6-MYAK Northgate DKYY6 1,115.22 $
POS Major Rebuild Kit - Parts Itemized -$
1700936 146 O-RING NITRILE 1 $ 4.63
1397749 DISC SPRING 80X54X2.25MM 1 22.26$
2853799 209 O-RING NITRILE 1 4.98$ 8816519 411 SHIM M12x4.0mm STAINLESS STEEL AISI316 8 74.93$ 7055696 513 WAVY WASHER 61X51X0.4MM 1 3.46$
1046419 513 SINGLE ROW DEEP GROOVE BALL BEARING 1 10.83$ 2594150 514 ANGULAR CONTACT BALL BEARING 2 162.16$
3290687 515 MECHANICAL SEAL M 1 1/8" SC/TC 1 918.78$ 4076695 516 MECHANICAL SEAL G-B, 1 1/2'' SC/C 1 360.81$ 4511944 524/530 O-RING NITRILE 2 3.73$ 7468772 525 O-RING NITRILE 1 1.19$ 9825850 527 O-RING NITRILE 1 1.80$ 1947437 536 SEALING RING 13X18X2MM COPPER 2 1.13$ 7396683 SNAP RING (SEEGER) A28 STAINLESS STEEL 1 2.12$
Hydraulic End Parts -$
D4K-LT4 -$
4111166 401 IMPELLER D4K-LT HI-CHROME A532-III-A $ 1,927.10 2888824 421 SUCTION LINER D4K-LT HI-CHROME A532-III-A $ 1,066.18 6839923 165 FLANGE FOR IMPELLER D-CONE 28MM DUCTILE IRON 523.29$ D4K-S4R -$
3614057 401 IMPELLER D4K-S D-CONE HI-CHROME A532-III-A $ 1,927.11 1289092 421 SUCTION LINER D4K-S HI-CHROME A532-III-A $ 1,066.18 D4K-HS4R -$
5542674 401 IMPELLER D4K-HS D-CONE HI-CHROME A532-III-A $ 2,172.03 7756876 421 SUCTION LINER D4K-HS HI-CHROME A532-III-A $ 1,066.18 E5K-L4R -$
4529086 401 IMPELLER E5K-L HI-CHROME A532-III-A $ 2,478.17 8193736 421 SUCTION LINER REGULABLE E5K & E8K-LL,-LS HI-CHROME A532-III-A $ 1,581.27 7850552 165 FLANGE FOR IMPELLER E, E-CONE, K LINE, Q-MOTOR DUCTILE IRON A536-80-55-06 $ 1,716.47 E5K-LL4R -$
6190422 401 IMPELLER E5K-LL/E8K-LL HI-CHROME A532-III-A $ 2,478.17 8193736 421 SUCTION LINER REGULABLE E5K & E8K-LL,-LS HI-CHROME A532-III-A $ 1,581.27 7850552 165 FLANGE FOR IMPELLER E, E-CONE, K LINE, Q-MOTOR DUCTILE IRON A536-80-55-06 $ 1,716.47 E5K-LS4R -$
3474688 401 IMPELLER E5K-LS/E8K-LS HI-CHROME A532-III-A $ 2,478.17 8193736 421 SUCTION LINER REGULABLE E5K & E8K-LL,-LS HI-CHROME A532-III-A $ 1,581.27 7850552 165 FLANGE FOR IMPELLER E, E-CONE, K LINE, Q-MOTOR DUCTILE IRON A536-80-55-06 $ 1,716.47 F6K-L4R -$
5403499 401 IMPELLER F6K-L HI-CHROME A532-III-A $ 5,628.38 1631091 421 SUCTION LINER REGULABLE F6K-M/L HI-CHROME A532-III-A $ 2,935.66 3112728 165 FLANGE FOR IMPELLER F, CONE 50MM DUCTILE IRON A536-80-55-06 778.98$ #3..
- 219 -
F6K-H4R -$
9917111 401 IMPELLER F6K-H HI-CHROME A532-III-A $ 4,855.49 3520042 421 SUCTION LINER REGULABLE F6K-H/S HI-CHROME A532-III-A $ 2,935.66 3112728 165 FLANGE FOR IMPELLER F, CONE 50MM DUCTILE IRON A536-80-55-06 778.98$ F10K-HD4/5R -$
4123468 401 IMPELLER F10K-HD STAINLESS STEEL AISI316 $ 6,263.06 5161436 421 SUCTION LINER REGULABLE F10K-HD/SD/SS HI-CHROME A532-III-A $ 4,037.85 3112728 165 FLANGE FOR IMPELLER F, CONE 50MM DUCTILE IRON A536-80-55-06 778.98$ H12K-HD4/5R -$
7920600 401 IMPELLER H12K-HD STAINLESS STEEL AISI316 $ 11,774.543108596 421 SUCTION LINER REGULABLE H12K-HD/SD/SS HI-CHROME A532-III-A $ 4,952.79 6909922 165 FLANGE FOR IMPELLER H, CONE 75MM DUCTILE IRON A536-80-55-06 $ 1,563.89 H12K-SS4/5R -$
7402472 401 IMPELLER H12K-SS STAINLESS STEEL AISI316 $ 10,157.663108596 421 SUCTION LINER REGULABLE H12K-HD/SD/SS HI-CHROME A532-III-A $ 4,952.79 6909922 165 FLANGE FOR IMPELLER H, CONE 75MM DUCTILE IRON A536-80-55-06 $ 1,563.89 H12K-MD4/5R -$
3423174 401 IMPELLER H12K-MD STAINLESS STEEL AISI316 $ 11,774.541575891 421 SUCTION LINER REGULABLE H12K-MD HI-CHROME A532-III-A $ 4,952.79 6909922 165 FLANGE FOR IMPELLER H, CONE 75MM DUCTILE IRON A536-80-55-06 $ 1,563.89 I10K-S4/5R -$
5136586 401 IMPELLER I10K-S STAINLESS STEEL AISI316 $ 17,198.357647793 421 SUCTION LINER, REGULABLE, I10K-H/S, HI-CHROME A532-III-A $ 8,743.21 9254309 165 FLANGE FOR IMPELLER I/L, CONE 100MM, I1M I4M I5M L1M L4M L5M, I-MOTORS L-MOTORS, DUCTILE IRON A536-80-55-06 $ 4,364.23 Grundfos Johansen SL1.40.A40.100.EX.4.61R.C $ 2,450.00
99489003
Kit, Shaft
Seal cartridge 1 $ 2,200.00
96873543 Kit, Orings 1 $ 130.00
96690705 Kit, Bearings 1 330.00$
Clayton
Martin
SL1. 40.A40..55.EX.4.61R.C $ 2,450.00
99489003
Kit, Shaft
Seal cartridge 1 $ 2,200.00
96873542 Kit, Orings 1 130.00$ 96904928 Kit, Bearings 1 330.00$ Major Rebuild Kit - Parts Itemized
Major Rebuild Kit - Parts Itemized
#3..
- 220 -
FINANCIAL INTEREST DISCLOSURE
Any contract award therewith will require approval by a majority vote of the City of Modesto’s City Council.
In order to have full transparency in any City of Modesto commercial actions, the City Council may not approve an agreement between the City and the Vendor until all person with a direct or indirect financial interest of greater than $2,000 in the Vendor are identified by name.
Vendor must therefore complete this Financial Interest Disclosure Form, listing by name all parties that have a material financial interest in the agreement, contract or development right.
PLEASE NOTE, any Council action that requires a Financial Interest Disclosure cannot be considered by the City Council until the required reporting is made. That means that City Council agenda items without the disclosure will be removed from the Council agenda.
Financial Interest Disclosure to City of Modesto
The Vendor shall identify any person with a financial interest in the Vendor by name, below.
For the purposes of this disclosure, a “Financial Interest” shall have the meaning contained in Modesto Municipal Code section 2-10.02.
Persons having an aggregate economic interest in the Vendor less than two thousand dollars ($2,000.00) at all times prior to final Council action of the proposed contract are not required to be listed on the Financial Interest Disclosure.
Notwithstanding the foregoing, a Financial Interest Disclosure is not required for a Vendor meeting the financial criteria for listing on the New York or the Pacific Stock exchanges unless it is reasonably foreseeable that a City Council decision will increase or decrease that entity's gross revenues or expenses by one million dollars ($1,000,000) or more and the requirements of Modesto Municipal Code Section 2-10.03(h) are satisfied.
It is the legal obligation of all applicants for approval of an agreement or of an application for development rights to verify in writing, under penalty of perjury, that the identity of each person having a material financial interest in the Vendor is true, correct and complete. By signing below, the applicant understands that this information is provided under penalty of perjury, and that intentionally supplying misinformation or deception may result in either invalidation of the agreement or application, or criminal prosecution for misdemeanor violation of the Modesto Municipal Code, or both. Negligent provision of misinformation shall be grounds for invalidation. In accordance with the Modesto Municipal Code, each applicant has a continuing obligation to maintain the truth, accuracy and completeness of the financial interest disclosure information provided below until after final consideration by the City Council of any matter arising out of or relating to the agreement or application.
#3..
- 221 -
Print Names of Persons Having a Financial Interest in Vendor Receiving this Agreement:
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
First Name, Last Name
By signing this document, I agree to the information contained within.
Bidder Company Name:
Name of Vendor Signatory:
Signature of Vendor Representative:
#3..
- 222 -
California Levine Act Disclosure
California Government Code Section 84308, also known as the "Levine Act", prohibits City “officers” from participating in any action related to a license, permit, or other entitlement for use (a “proceeding”) if such member accepts, solicits, or directs political contributions from a party to the proceeding or their agent totaling more than $500 while the proceeding is pending before the agency, and for twelve (12) months following the date a decision concerning the proceeding has been made. The Levine Act also requires disclosure of such contribution by a party to the proceeding.
Section 84308(a)(4) of the Levine Act defines an "officer" as follows: “Officer” means any elected or appointed officer of an agency, any alternate to an elected or appointed officer of an agency, and any candidate for elective office in an agency. The term “officer” is further defined 2 Cal. Code Regs. Section 18438.1, which states:
An officer of an agency includes only those persons who make, participate in making, or in any way attempt to use their official position to influence a decision in the license, permit, or entitlement for use proceeding, or who exercise authority or budgetary control over the agency of officers who may do so, and:
(1) Serve in an elected position, including an official appointed to an elected position due to an interim vacancy or an election otherwise canceled because the official was the sole candidate for the position; (2) Serve as a member of a board or commission;
(3) Serve as the chief executive of a state agency, or county, city or district of any kind; or (4)Have decision making authority with respect to the proceeding involving a license, permit, or other entitlement for use and is also a candidate for elected office or has been a candidate for elective office in the 12 months prior to the proceeding.
A list of Modesto City Council Board Members can be found online at: Modesto City Council https://modestogov.com/706/Council-Members (modestogov.com). The party making this certification is responsible for determining whether a recipient of a political contribution is a City officer prior to answering the following questions:
1. Have you, your company, or any agent on behalf of you or your company, made any political contributions of more than $500 to any City officer, in the twelve (12) months preceding the date of the submission of your proposals or the anticipated date of any Council action related to this contract?
___ YES If yes, please identify the Council Member(s):
___ NO
2. Do you, or your company, or any agent on behalf of you or your company, anticipate or plan to make any political contribution of more than $500 to any City officer in the twelve (12) months following any Council action related to this contract?
___ YES If yes, please identify the Council Member(s):
___ NO
#3..
- 223 -
Answering YES to either of the questions above does not preclude the City of Modesto from awarding a contract to your firm or taking any subsequent action related to the contract. It may, however, preclude the identified City officer from participating in any actions related to such contract.
HEREBY CERTIFY UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT THE FOREGOING IS TRUE AND CORRECT.
_________________ _____________________________
Date Signature of authorized individual
_____________________________
Company/Applicant Name
#3..
- 224 -
#3..
- 225 -
#3..
- 226 -
#3..
- 227 -
CITY OF MODESTO
COMMITTEE AGENDA REPORT
DATE OF MEETING:
August 3, 2026
Date: July 13, 2026
TO: Economic Development Committee
Sue Zwahlen, Chair
Nick Bavaro, Vice Chair
Eric Alvarez, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: Chad Reed, Director of Public Works
SUBJECT: Second Amendment to the Agreement with HDR Engineering, Inc to Complete Assigned Work and Gain Regulatory Compliance for the Carpenter Road Landfill
CONTACT: John Chavez, Integrated Waste Manager, jchavez@ modestogov.com, 209-577-5453
DESCRIPTION:
Consider the Second Amendment with HDR Engineering, Inc., of Folsom, CA to complete assigned work and to gain Regulatory Compliance for the Carpenter Road Landfill, Modesto California, thereby increasing the Agreement amount by $820,774 and forwarding to Council for approval. (Funding Source: Carpenter Road Landfill) STRATEGIC PLAN ELEMENT:
The recommended action supports the City’s 2025-2026 Strategic Plan Area of Focus:
Goal B: “Increase pride in Modesto’s diverse neighborhoods and business districts through strategy 1: Invest in beautification efforts and by investing in community assets and amenities.”
BACKGROUND:
The City of Modesto owned and operated the Carpenter Rd Landfill from 1956-1968. It was a pre-Subtitle D landfill, which means there was never a liner put in, or gas and leachate control systems. The landfill size is thirty-nine acres and is split into two areas, east and west, bordering Carpenter Road. The City has ensured post-closing monitoring of water and gas wells, as well as general maintenance as required under State law. In the mid-2000’s there was a spike in one methane gas well, as well as a release of Volatile #4..
- 228 -
Economic Development Committee, August 3, 2026
Second Amendment to the Agreement with HDR Engineering, Inc to Complete Assigned Work and to Gain Regulatory Compliance for the Carpenter Road Landfill
Organic Compounds (VOC’s). The Regional Water Quality Control Board (Water Board) mandated the City to provide a Mitigation and Monitoring Plan, as well as a Corrective Action Plan. In 2015 the Water Board issued a Cleanup and Abatement Order (CAO) to the City based on their approval of the Correction Action Plan. The City agreed to cleanclose the east fill and move all the waste to the west fill. The idea behind this would be that all the waste would be contained in one area on the west side and a culvert and pipe would be placed to capture water runoff that would drain into a clean retention basin on the east side. The Water Board accepted this plan. The City conducted an initial study for a mitigated negative declaration and all agencies that were required to be notified were notified. Construction was planned to begin in 2016-2017, however, unusually wet weather delayed the project by approximately one year.
The City then went out to bid in 2018 and on August 14, 2018, by Resolution No. 2018- 345 Council awarded the project to Pacific States Environmental Contractors, Inc. of Dublin, CA. Construction began in 2018 and by August 2020, observable waste, and impacted soil from the Eastern Waste Management Unit (WMU) was removed and consolidated into the Western WMU, and a new soil cover was installed atop the Western WMU. A stormwater retention basin was constructed in the former Eastern WMU location, and documents were submitted to the Water Board regarding closure. The Water Board contends that the documents are not complete, and subsequent submittal of additional information did not completely satisfy the requirements of the CAO. The Water Board has provided notice that the City remains non-compliant with the CAO and that it may be subject to significant civil penalties until the delinquent reports are resolved.
On September 12, 2023, by Resolution No. 2023-412, the City entered into an agreement with HDR Engineering, Inc., of Folsom, CA to complete assigned work and to gain regulatory compliance for the Carpenter Road Landfill, Modesto California for an amount not to exceed $271,700 over a five-year period, plus $27,170 for additional services authorized by the City Manager, for a total amount not to exceed $298,870.
On June 24, 2025, the First Amendment to the Agreement was approved via Council Resolution No. 2025-238, to complete assigned work and to gain regulatory compliance, and to increase the amount of the Agreement to $351,450. This Amendment was needed for cost associated with trenching that would take place on the South end of the landfill adjacent to the Tuolumne River. The purpose of this trenching was to identify and locate any residual waste so that it may be removed, allowing Post Closure Maintenance Plan to continue and regulatory compliance achieved.
DISCUSSION:
This Second Amendment is necessary to complete regulatory compliance activities required by the State Water Resources Control Board and associated permitting agencies so the City of Modesto can resolve outstanding compliance obligations at Carpenter Road Landfill.
#4..
- 229 -
Economic Development Committee, August 3, 2026
Second Amendment to the Agreement with HDR Engineering, Inc to Complete Assigned Work and to Gain Regulatory Compliance for the Carpenter Road Landfill
HDR Engineering, Inc. reviewed the existing CAO received from the Water Board and the supporting documents provided by the City. The tasks listed below are outlined in the original Agreement to address the Water Board’s requested work and to ensure compliance.
Phase 1
Task 100 Project Management
Task 200 Site Reconnaissance and Kickoff Meeting
Task 300 Cover Completion Confirmation Work Plan
Task 400 Stormwater Repair and Protection Work Plan
Task 500 Residual Waste Removal Work Plan
Task 600 Clean Closure Results Discussion
Task 700 Post-Closure Maintenance Plan (PCMP)
HDR Engineering, Inc. is currently working on all the tasks mentioned in Phase 1. The request to amend the Agreement is regarding Task 500: Residual Waste Removal Work Plan. The plan is to remove the waste materials that are located on the banks of the Tuolumne River. To conduct any work at the location, the City needed to obtain a permit from the California Department of Fish and Wildlife (CDFW). In October 2024, the City submitted an application to obtain a Lake or Streambed Alteration Agreement. On February 28, 2025, CDFW issued an Operation of Law letter stating that because they did not respond to the City by January 31, 2025, an agreement is not required. However, the City is still obligated to complete the project as exactly described in the application without an agreement.
The CDFW permit indicated that the City is responsible for complying with certain biological monitoring requirements such as Fish and Game Code sections 2080, 1908, 3511, 4700, 5050, and 5515, and other sections mentioned in the notice. Also, the Water Board indicated that the City is required to excavate additional trenches by the riverbank.
With the above requirement, the City is requesting a Second Amendment to the current Agreement with HDR Engineering, Inc.
In September 2025, HDR submitted a Cover Repair Alternatives Analysis and cost estimate,
presenting four alternatives to achieve cover density and moisture content requirements for the
landfill cover and for removal of residual waste. This proposal is based on the City’s selection of
cover mitigation alternative 2 to reconstruct the soil cover and remove residual waste The following tasks have been identified to complete Residual Waste Removal Work Plan:
Task 5 – Residual Waste Removal Work Plan
#4..
- 230 -
Economic Development Committee, August 3, 2026
Second Amendment to the Agreement with HDR Engineering, Inc to Complete Assigned Work and to Gain Regulatory Compliance for the Carpenter Road Landfill
a. Environmentally Sensitive Area Fencing Oversight
b. Conduct Worker Environmental Awareness Training
c. Nesting Bird and Raptor Surveys
d. Pond Turtle Nesting Survey
e. Roosting Bats and Maternity Colony Survey
f. Burrowing Owl Survey
g. Biological Monitoring during Trenching
h. Underground Utility Marking
i. Additional Trenches
Modesto Municipal Code Section 8-3.203 generally requires all purchases, which meet or exceed $100,000 for material, equipment, or contractual services to be formally bid.
However, exceptions to the formal bidding process are granted in MMC 8-3.204(f) “Where the Purchasing Manager in her discretion, determines that it is appropriate to amend the services or goods provided under an existing agreement to include additional similar goods or services, of limited quantity or scope, in order to increase efficiency and avoid delays or disruptions to City projects or services. Thus, HDR has started the process to obtain a CDFW permit requited to complete the original scope of work, this amendment is necessary to conduct biological monitoring as required for the CDFW permit. #4..
- 231 -
Economic Development Committee, August 3, 2026
Second Amendment to the Agreement with HDR Engineering, Inc to Complete Assigned Work and to Gain Regulatory Compliance for the Carpenter Road Landfill
FISCAL IMPACT:
On September 12, 2023, by Resolution No. 2023-412, the City entered into an Agreement with HDR Engineering, Inc. of Folsom, CA to complete assigned work and to gain regulatory compliance for the Carpenter Road Landfill for an amount not to exceed $271,700 over a five-year period.
For reference, the First Amendment increased the total by $47,800 to a new total amount not to exceed $319,500 plus $31,950 for additional services authorized by the City Manager, for a total amount not to exceed $351,450.
This Second Amendment will increase by $820,774 to a new total amount not to exceed $1,065,658 plus $106,566 for additional services authorized by the City Manager. The expenses for the agreement will be absorbed within the current Carpenter Road Landfill operating budget.
Task Deliverable Fee
Task 800 Kick-off Meeting & Project Management $84,689
Task 900 Site Repair Design and Contract Documents $98,152 Task 1000 Construction Administration $133,596
Task 1100 Construction Observation $90,648
Task 1200 Revised Final Construction and Completion
Report
$48,951
Task 1300 Waste Removal Permitting $110,455
Task 1301 OPTIONAL Waste Removal Permitting $88,820
Task 1400 Waste Removal Oversight and Reporting $145,064 Task 1500 Remote and On-Site Meeting Support $20,399
TOTAL $820,774
CEQA/NEPA REQUIREMENTS:
Environmental review for the Carpenter Road Landfill Clean Closure Project was completed through an Initial Study and Mitigated Negative Declaration adopted by the City Council on March 13, 2018, via Resolution No. 2018-113. The proposed Agreement Amendment supports ongoing work associated with implementation of that project.
RECOMMENDED COMMITTEE ACTION:
Motion recommending the Second Amendment with HDR Engineering, Inc to complete assigned engineering and permitting work as next steps to gain regulatory compliance for the Carpenter Road Landfill, Modesto, California, increasing the Agreement amount by $820,774 to a new total amount not to exceed $1,172,224 through the term of the Agreement; and forwarding to Council for approval.
#4..
- 232 -
Economic Development Committee, August 3, 2026
Second Amendment to the Agreement with HDR Engineering, Inc to Complete Assigned Work and to Gain Regulatory Compliance for the Carpenter Road Landfill
Approved by:
Chad Reed, Director of Public Works
Joseph P. Lopez, City Manager
Attachments:
1. Second Amendment for HDR Consulting Service
2. Executed First Amendment to Agreement
3. Executed Agreement HDR Carpenter LF Closure Phase I
4. Exhibit A
5. Exhibit A-1
6. Exhibit B (SOW)
#4..
- 233 -
SECOND AMENDMENT TO THE AGREEMENT
FOR CONSULTANT SERVICES WITH HDR ENGINEERING, INC.
This SECOND AMENDMENT for Consultant Services is made with reference to the contractual agreement between the CITY OF MODESTO, a municipal corporation of the State of California (hereinafter the “CITY”) and HDR ENGINEERING, INC., a Nebraska corporation (hereinafter “CONSULTANT”) as of the ________ day of ___________ 2026, hereinafter referred to as "ORIGINAL AGREEMENT".
This SECOND AMENDMENT to AGREEMENT for Consultant Services is made with regard to the following recitals:
The ORIGINAL AGREEMENT between CITY and CONSULTANT was approved via Council Resolution No. 2023-412 .
On or about June 24, 2025, the FIRST AMENDMENT to the ORIGINAL AGREEMENT was approved via Council Resolution No. 2025-238 , to complete assigned work and to gain regulatory compliance, and to increase the amount of the Agreement .
Paragraph No. 9 "AMENDMENTS" of the ORIGINAL AGREEMENT acknowledges the parties understand it may become desirable or necessary for CITY or CONSULTANT to modify the scope of services provided for under the Agreement and any such modification must be in writing signed by both parties.
Paragraph No. 3 "COMPENSATION" of the ORIGINAL AGREEMENT for Consultant Services specifies the sum of THREE HUNDRED FIFTY ONE THOUSAND FOUR HUNDRED FIFTY AND 00/100 ($351,450) as the total compensation CONSULTANT agrees to accept for performing all services and furnishing all staffing and materials for the project as well as performance by CONSULTANT of all of its duties and obligations required in the ORIGINAL AGREEMENT.
On or about June 2, 2026, CONSULTANT submitted to the CITY a proposal for cover repair design, contract administration and construction quality assurance services, with residual waste removal permitting and oversight for Carpenter Road Landfill, Modesto, CA.
The aforementioned estimated additional tasks increase the amount of the ORIGINAL AGREEMENT by EIGHT HUNDRED TWENTY THOUSAND SEVEN HUNDRED SEVENTY FOUR AND 00/100 ($820,774). The amounts listed above are the estimated level of effort for each task. In no case shall the total fee exceed the total contract amount under the ORIGINAL AGREEMENT, including Additional Services as authorized, and this SECOND AMENDMENT to Agreement without memorializing an additional written amendment to the original contract signed by both parties.
The parties to the ORIGINAL AGREEMENT and to this SECOND AMENDMENT to Agreement now understand and agree that it is necessary to modify Paragraph no. 1 entitled “SCOPE OF SERVICES” of the ORIGINAL AGREEMENT.
#4..
- 234 -
The parties to the ORIGINAL AGREEMENT and to this SECOND AMENDMENT to Agreement now understand and agree that it is necessary to modify Paragraph no. 3 entitled “COMPENSATION” of the ORIGINAL AGREEMENT.
The parties to the ORIGINAL AGREEMENT and to this SECOND AMENDMENT to Agreement further understand and agree the ORIGINAL AGREEMENT is modified solely by the modifications contained in this SECOND AMENDMENT to Agreement and in no other way whatsoever.
NOW, THEREFORE, in consideration of this SECOND AMENDMENT to Agreement, and the mutual promises, covenants, and stipulations contained in the ORIGINAL AGREEMENT for CONSULTANT SERVICES and this SECOND AMENDMENT, the parties agree as follows:
1. The parties agree that each of the recitals set out above is factually true and correct.
2. Paragraph no. 1 entitled "SCOPE OF WORK" of the ORIGINAL AGREEMENT shall be deleted and the parties agree to and hereby do substitute the following in its place:
SCOPE OF SERVICES.
Consultant shall undertake and complete the preparation of the scope of work as set forth and described in the documents attached hereto and referred to as Exhibit A, Exhibit A-1 and Exhibit A-2. The Consultant shall perform the services as described in Exhibit A, Exhibit A-1, and Exhibit A-2 in a manner compatible with the standards of its profession and shall produce a fully complete project that is acceptable to City.
3. Paragraph no. 3 entitled "COMPENSATION" of the ORIGINAL AGREEMENT shall be deleted and the parties agree to and hereby do substitute the following in its place:
COMPENSATION.
Consultant agrees to accept a sum not to exceed ONE MILLION SIXTY FIVE THOUSAND SIX HUNDRED FIFTY EIGHT AND 00/100 DOLLARS ($1,065,658) (maximum compensation) as full remuneration for performing all services and furnishing all staffing and materials for CITY in accordance with Exhibit A, Exhibit A-1, and Exhibit A-2 attached hereto for performance by CONSULTANT of all of its duties and obligations under this Agreement, except that additional services may be compensated as described below.
The compensation shall be paid pursuant to and in the manner and at the time set forth below:
CITY shall pay CONSULTANT on a time and materials basis for CONSULTANT’s actual costs for all work called for in Exhibit A, Exhibit A-1, and Exhibit A-2 to this AGREEMENT. All work to be performed under this AGREEMENT shall be billed on a lump sum basis for percent completion on each of the tasks set forth in Exhibit A, Exhibit A-1, and Exhibit A-2 attached hereto. CONSULTANT shall submit monthly invoices to CITY which include detailed tasks, hours worked, and billable rates for all work completed, and #4..
- 235 -
detailed receipts for any reimbursable expenses paid by CONSULTANT and identified in Exhibit A, Exhibit A-1, and Exhibit A-2 or approved by the CITY in writing. Expenses for travel reimbursement shall comply with the City's Administrative Directive (AD) 1.2, as amended periodically. The City's AD 1.2 can be accessible at the link provided - https://www.modestogov.com/DocumentCenter/View/24156/Citys-AdministrativeDirective-12.
CITY shall pay CONSULTANT "Net 45 Days via manual check". CITY shall pay all undisputed amounts within 45 days following receipt of the CONSULTANTS' invoice.
Additional services may be authorized by the City Manager in an amount up to, but not to exceed 10% of the agreed maximum compensation, or ONE HUNDRED SIX THOUSAND FIVE HUNDRED SIXTY SIX AND 00/100 DOLLARS ($106,566). In the event that additional services are deemed necessary, the Consultant shall provide a written request to the City Manager indicating the reason for additional work, scope and cost of such work. The City Manager shall provide a written response to the request, either approving or denying the additional expenditure. If additional services are requested and approved, they will be billed at the hourly rates set forth in Exhibit A-2 and may not exceed the amount requested and approved in writing by the City Manager. In that event, the new total compensation shall not exceed ONE MILLION ONE HUNDRED SEVENTY TWO THOUSAND TWO HUNDRED TWENTY FOUR AND 00/100 DOLLARS ($1,172,224). If additional services in excess of this amount are deemed necessary by City Staff, an amendment to this Agreement will be required and must be approved by the City Council prior to commencing the work, as provided in Paragraph 9 of this Agreement.
4. Except as herein amended or modified, the provisions of the ORIGINAL AGREEMENT are expressly reaffirmed and remain in full force and effect to the extent they are not in conflict with this SECOND AMENDMENT.
IN WITNESS WHEREOF, the CITY OF MODESTO, a municipal corporation, has authorized the execution of this SECOND AMENDMENT to the ORIGINAL AGREEMENT for CONSULTANT SERVICES by its City Manager and attestation by its City Clerk under the authority of Resolution No. ___________ on the ________ day of ___________ 2026, and HDR ENGINEERING, INC. has caused this SECOND AMENDMENT to be duly executed as of the Effective Date. #4..
- 236 -
#4..
- 237 -
#4..
- 238 -
#4..
- 239 -
#4..
- 240 -
#4..
- 241 -
#4..
- 242 -
#4..
- 243 -
#4..
- 244 -
#4..
- 245 -
#4..
- 246 -
#4..
- 247 -
#4..
- 248 -
#4..
- 249 -
#4..
- 250 -
#4..
- 251 -
#4..
- 252 -
#4..
- 253 -
#4..
- 254 -
#4..
- 255 -
#4..
- 256 -
#4..
- 257 -
#4..
- 258 -
#4..
- 259 -
#4..
- 260 -
#4..
- 261 -
#4..
- 262 -
#4..
- 263 -
#4..
- 264 -
#4..
- 265 -
#4..
- 266 -
#4..
- 267 -
#4..
- 268 -
#4..
- 269 -
#4..
- 270 -
#4..
- 271 -
#4..
- 272 -
#4..
- 273 -
#4..
- 274 -
#4..
- 275 -
#4..
- 276 -
#4..
- 277 -
#4..
- 278 -
hdrinc.com
2365 Iron Point Road, Suite 300, Folsom, CA 95630-8709
(916) 817-4700
June 2, 2026
John Chavez
Integrated Waste Program Manager
City of Modesto Department of Public Works
PO Box 642
Modesto, CA 95353
Subject: Proposal for Cover Repair Design, Contract Administration and Construction Quality Assurance Services, with Residual Waste Removal Permitting and Oversight
Carpenter Road Landfill, Modesto, CA
Dear Mr. Chavez,
In accordance with our April 6, 2026, meeting and our correspondence through May 27, 2026, HDR has prepared this scope of services at your request to facilitate regulatory compliance for the Carpenter Road Landfill (Landfill). The Central Valley Regional Water Quality Control Board (Water Board) has notified the City of Modesto (City) that the Landfill cover does not meet soil compaction standards, that the stormwater management system and the southern slope stabilization of the closed landfill need to be improved to meet regulatory requirements, and that waste observed between the southern landfill boundary and north of the Tuolumne River (residual waste) requires excavation and disposal before certification for landfill closure. The City has requested this scope of work from HDR to resolve these noncompliance items.
1.0 Background
The City owns and maintains the former Carpenter Road Landfill, regulated by the Water Board.
The Landfill site is approximately four miles southwest of the City along Carpenter Road, immediately north of the Tuolumne River. The Landfill formerly included two individual unlined waste management units (WMUs), the Eastern WMU and the Western WMU, split geographically by Carpenter Road.
In 2015, the Water Board issued CAO R5-2015-0700 directing the City to address landfillrelated groundwater impacts along the Tuolumne River and to clean-close the Eastern WMU by relocating its waste to the Western WMU. The order also required the City to install a final cover over the Western WMU, construct a stormwater retention basin, and submit reports demonstrating completion of the required CAO tasks.
Between August 2019 and March 2021, observable waste and impacted soil from the Eastern WMU were removed and consolidated into the Western WMU, and a new soil cover was installed atop the Western WMU. A stormwater retention basin was constructed in the former Eastern WMU location, and documents were submitted to the Water Board regarding closure.
The Water Board contends that the documents are incomplete, and that the subsequent submittal of additional information, as recently as January 25, 2023, by others on behalf of the City did not fully satisfy the requirements of the CAO. The Water Board was not in receipt of #4..
- 279 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services compaction or physical property testing of the installation of the Western WMU cover and requested that verification testing be performed.
In April 2024, HDR prepared a Stormwater Repair Work Plan that presented the results of hydraulic modeling intended to assess the potential for final cover erosion during a 100-year, 24-hour precipitation event and to evaluate surface water elevations and velocities along the southern slope of the WMU from a 100-year flood event on the Tuolumne River.
In May 2024, HDR performed post-WMU cover installation Construction Quality Assurance (CQA) testing and observations to document the construction of the final cover at the Carpenter Road Landfill. The CQA testing documented that the cover soil met the requirements for 100% passing 3 inches and the minimum soil cover thickness. However, the minimum requirement of achieving soil cover compaction at 95% of the maximum dry density was not met across the three lifts, with the lowest lift having the lowest average compaction.
In August 2025, HDR excavated twelve trenches to assess the extent of residual waste on the south side of the site, abutting the Tuolumne River. The findings indicated that approximately 1,660 cubic yards of waste and soil were present in the vicinity of two co-located trenches.
In September 2025, HDR submitted a Cover Repair Alternatives Analysis and cost estimate, presenting four alternatives to achieve cover density and moisture content requirements for the landfill cover and for removal of residual waste. This proposal is based on the City’s selection of cover mitigation alternative 2 to reconstruct the soil cover and remove residual waste.
2.0 Scope of Services
The scope and deliverables presented herein address the Water Board’s requested work as presented in its letter dated April 6, 2026.
Task 800: Kick-off Meeting and Project Management
HDR will schedule and facilitate a kick-off meeting within two (2) weeks of receiving the notice to proceed. The meeting will cover both technical and administrative project items with key team members. Throughout execution of the tasks described in this scope, HDR will support the taskspecific activities through coordination of team members, meetings, communication, reporting, and quality controls. This task has been established in recognition that these activities transcend individual tasks; are required for effective project execution; may require flexibility in timing, extent, and response to project needs; and cannot always be precisely predicted or assigned to a single activity.
This task includes communication between the City and HDR; planning, organizing, and monitoring project team activities; attending meetings, as requested; responding to specific requests not specifically addressed in the scope; and preparing and updating project schedules.
Overall coordination includes the following:
• Identify key personnel and their roles.
• Allocate resources based on project schedules and activities. • Coordinate production.
#4..
- 280 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services • Prepare and update overall project schedules.
• Coordinate activities affecting HDR’s services.
• Develop internal guidance documents for HDR personnel to define key project objectives, activities, constraints, guidelines, and procedures. • Maintain SharePoint or a similar cloud-based data exchange site.
DELIVERABLES
• Draft agenda for the kick-off meeting
• Attendance and presentations at meetings.
• Agendas and meeting minutes for meetings, including distribution to meeting attendees. • Project schedule and schedule updates monthly.
• HDR internal guidance documents and quality control (QC).
MEETINGS
• Kick-off meeting with up to four (4) HDR staff.
• Up to twenty-four (24) one-hour monthly meetings with the City and up to two (2) HDR staff.
KEY UNDERSTANDINGS
• Project meetings will be held virtually.
Task 900: Site Repair Design and Contract Documents
HDR will prepare design documents for:
• Repair of the stormwater drainage system to address erosion and ponding. • Reconstruction and improvements of the landfill final cover system. • Stabilization of the southern slope to withstand erosive forces from a 100-year flood event.
• Removal of residual waste and site restoration.
Key items to be completed during design include the following:
• Consistent with recommendations from the April 2024 Stormwater Repair and Protection Workplan,
o Design and specifications for the reconstruction of the landfill down-drain to mitigate erosion.
o Design and specifications for additional drainage basins and piping along the western limits of the landfill to address ponding water. o Design and specifications for diversion berms on the final cover to allow water to stabilize down drain for discharge.
o Design and specifications of high-performance turf reinforcement mat (HPTRM) for erosion protection to an elevation of 70 feet along the southern slope of the Western WMU.
o A CQA plan that prescribes construction quality control (CQC) and quality assurance activities.
#4..
- 281 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services • Consistent with findings from the September 2024 Final Construction Completion Report and the September 2025 Cover Repair Alternatives Memo
o Landfill cover soil technical specifications for re-compaction of existing cover soil and placement of additional soil cover meeting specified soil type, thickness, compaction, and moisture content.
o A CQA plan that prescribes CQC and quality assurance (QA) activities. • Consistent with findings from the September 2025 Residual Waste Assessment and the September 2025 Cover Repair Alternatives Memo,
o Residual waste removal plan, waste removal and biological monitoring plans, waste disposal requirements, and a site restoration plan.
HDR will use the current topographic survey (provided by the City) to prepare construction contract documents and specifications. HDR will provide design documents for the City to review at required intervals (60%, 90%, and final design) and will discuss comments, questions, and input following each submittal. Concurrently, with these design submittals, HDR will provide an updated opinion of probable construction costs (OPCC).
HDR will prepare special provisions and front-end documents. At the City’s direction, front-end documents will be based on engineering joint council documents for construction or the City’s standard construction contract documents. The City will provide input on the bid form, City requirements, and front-end documents.
HDR will assemble design documents and prepare a submittal to the Water Board to obtain confirmation to construct the landfill final cover system repairs. HDR will prepare a comprehensive CQA plan addressing each of the three key items.
Regular progress meetings will be held to obtain the City’s input and to inform the City of progress, decisions, issues, or cost considerations that arise during the design.
DELIVERABLES
• 60% and 90% design plans, schedules, and updated OPCC.
Preliminary Drawing list includes:
o Cover Sheet
o Legend and Notes
o Existing Conditions Plan
o Erosion and Sediment Control Plan
o Proposed Cover System Reconstruction Plan
o Proposed Stormwater Improvements Plan
o E&SC Details
o Stormwater Details
o Cover System Reconstruction Details
• Final construction contract documents, including design plans, technical specifications, comprehensive CQA plan, special provisions, and front-end documents. • Residual waste removal plan, biological monitoring plans, waste disposal requirements, and a residual waste site restoration plan.
#4..
- 282 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services
MEETINGS
• 60%, 90%, and final design review meetings (virtual) with up to two (2) HDR personnel. • One review meeting (virtual) with the Water Board to discuss construction contract document comments.
KEY UNDERSTANDINGS
• Front-end documents are for bidding purposes. It will be at the City’s discretion whether front-end documents are necessary for a change order with the existing contractor. • Two contractors and two contracts are anticipated to conduct site repairs/improvements, one for the cover repair and a second for residual waste removal. • Construction contract documents will include provisions for change order pricing. • HDR does not guarantee receipt of permit approvals from regulatory agencies or have any control over the duration of their reviews.
Task 1000: Construction Administration
HDR will assist the City in documenting the design intent confirming that contract documents accurately reflect the design and obtaining the quality assurance documentation necessary for Water Board approval. As part of this task, the HDR project team will perform the following work:
• Provide bidding assistance, including presiding over pre-bid meetings, responding to requests for clarification or additional information, and issuing addenda. • Report compliance with the CQA plan prepared by HDR in Task 900. • Conduct pre-construction and monthly construction progress meetings, including final inspection of requests for substitutions or changes, and review and maintenance of shop drawings.
• Provide interpretation and consulting on design modifications and participate in punchlist inspection. • Prepare, process, and recommend monthly payment requests. • Review proposed change orders issued by the Contractor and provide recommendations to the City for approval.
• Prepare written reports of CQC and quality assurance documentation as required by the CQA plan.
DELIVERABLES
• Responses to requests for information.
• Two (2) pre-bid meetings with agenda and notes.
• Two (2) pre-construction meetings with agenda and meeting notes. • Five (5) monthly progress meeting agendas and meeting notes. • Change orders, pay requests, requests for information, and shop drawings. #4..
- 283 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services
MEETINGS
• Two (2) pre-bid meetings at city offices followed by a site walk. • Five (5) monthly progress meetings (virtual).
• Five (5) conflict resolution/ad-hoc meetings at the project site.
KEY UNDERSTANDINGS
• The construction schedule is anticipated to be three (3) months for the cover repair and one (1) month for the residual waste removal. Part-time construction observation is anticipated for 24 hours per week for four (4) months. If additional construction observation is required, it can be provided as an additional service. • Construction surveying and QC testing will be the Contractor’s responsibility. • The City will make decisions on contractual matters and will process Contractor pay requests, change orders, and other administrative matters. • Two contractors and two contracts are anticipated to conduct site repairs/improvements. • HDR will be responsible for construction administrative tasks and documentation, including review of change orders, preparation, and maintenance of required construction documentation, and providing “as-recorded” drawings.
Task 1100: Construction Observation
HDR will assist the City with construction observation services by providing a part-time resident project representative to document the intent of the design and contract documents. The services will consist of the following:
• Perform part-time construction observation for up to 24 hours per week for three (3) months, up to 300 hours for cover repair, and up to 24 hours per week for two (2) weeks for residual waste removal. Construction observations will be performed for stormwater, cover repair, and residual waste removal activities.
• Prepare a daily field report for each site visit.
• Review site conditions and document ongoing activities and corrective actions. • Assist in issuing field change directives and reviewing change order requests. • Observe site work, drainage, and final cover repair construction. • Review CQC testing performed by the Contractor for the final cover system components and installation of stormwater improvements. CQC testing requirements and frequencies will be defined in the contract documents.
• Maintain a progressive punch-list.
• Review and document schedule status.
• Review contractor survey of constructed (as-built) conditions. • Compile field and CQC lab test data submitted by the contractor.
DELIVERABLES
• Daily field reports.
• Supporting documentation for “as-recorded” drawings.
• Maintenance of contractor-provided field and laboratory test reports. #4..
- 284 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services
ON-SITE MEETINGS
• Two (2) pre-construction meetings with up to three (3) HDR staff. • Two (2) substantial completion meetings.
• Two (2) final completion meetings.
KEY UNDERSTANDINGS
• HDR will perform regular construction oversight across an anticipated three (3) month construction duration for cover repair and anticipate two (2) weeks for residual waste removal.
• Construction surveying and QC testing will be the responsibility of the Contractor. • The City will make all decisions on contractual matters and will process and take appropriate action on Contractor pay requests, change orders, and other administrative matters.
• HDR will not supervise, direct, or manage the Contractor’s means and methods, nor will HDR assume responsibility for the health and safety of the Contractor’s personnel. • The City will provide a meeting place for, and participate in, construction progress meetings.
• Two contractors are anticipated to conduct cover repairs and waste removal.
Task 1200: Revised Final Construction and Completion Report HDR will prepare a Revised Final Construction and Completion Report (Report) that will serve as an inclusive final revision of the original 31 August 2022 Closure Report. The report will document the closure project as completed and incorporate existing documentation, as available, including the following:
• Daily logs, as-built drawings, shop drawings, maps, topographic maps that show both the top of waste and top of final cover elevations, cross-sections, data tables, and laboratory test results for reconstructed final cover and stormwater management system. • Report will include discussion regarding variations of the reconstructed final cover system from the items included in the March 2016 Closure Plan, Technical Specifications, and CQA-Plan.
• Project Photograph Log: The previous photographs from the March 2016 Closure Plan will be incorporated by reference only.
• Observations and field and laboratory test reports for the disposal of residual waste and confirmation of clean closure in accordance with requirements agreed upon with the Water Board.
• QC and quality assurance documentation, including the final CQA certification and Revised Final Construction and Completion Report for submittal to the Water Board.
HDR will prepare a draft Revised Final Construction and Completion Report for City review and comment. HDR will facilitate a review meeting with the City to discuss comments and potential revisions to the draft Report. After the review meeting, HDR will prepare a final Report for submittal to the Water Board. HDR will prepare one round of responses to the Water Board and will revise the Report accordingly.
#4..
- 285 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services
DELIVERABLES
• Draft Report for City review.
• Report for submittal to the Water Board, incorporating City comments. • Response to the Water Board comments.
• Final Construction and Completion Report incorporating Water Board comments.
MEETINGS
• One draft Report review meeting (virtual) with up to two (2) HDR personnel. • One review meeting (virtual) with the Water Board to discuss the report comments.
KEY UNDERSTANDINGS
• The revised report will focus on the final cover repair work completed with residual waste removal and will append the existing report as a reference document.
Task 1300: Waste Removal Permitting
The objective of this task is to prepare and process required permit applications and agency notifications, including: a Section 404 permit from the U.S. Army Corps of Engineers; a Section 401 Water Quality Certification from the Water Board; a Fish and Game Code Section 1602 authorization from the California Department of Fish and Wildlife (CDFW); an encroachment permit from the Central Valley Flood Protection Board (CVFPB); and notifications to applicable local agencies.
Optional permitting services are included and may involve obtaining incidental take permits for state- and federally listed species if avoidance measures cannot be implemented prior to construction. These permits would be pursued in accordance with the federal and state Endangered Species Acts, under the jurisdiction of CDFW, the U.S. Fish and Wildlife Service (USFWS), and the National Marine Fisheries Service (NMFS).
This task will consist of the following:
• Prepare the USACE Section 404 Permit Application.
• Prepare the RWQCB Section 401 Permit Application.
• Prepare the CDFW Section 1602 Streambed Alteration Agreement Application via the online Environmental Permit Information Management System (EPIMS). • Prepare a CVFPB Encroachment Permit Application.
• Provide notification to the following agencies: CalRecycle, Tuolumne River Regional Park Joint Powers Authority, Parks, Recreation, and Neighborhoods Department.
If listed species’ habitats cannot be avoided, the following optional permitting tasks can be employed:
• Prepare the Biological Assessment Report for the USFWS Section 7 Consultation for Incidental Take of Federal Listed Plant or Wildlife Species. • Prepare the Biological Assessment Report for the NMFS Section 7 Consultation for Incidental Take of Federally Listed Fish Species.
• Prepare the CDFW Section 2081 Application for Incidental Take of State Listed Species.
#4..
- 286 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services HDR assumes that the Project will have temporary impacts on jurisdictional areas such that a Habitat Mitigation and Monitoring Plan will not be required. However, if listed species’ habitats cannot be avoided, and permitting is required under Section 7 and/or Section 2081, a Habitat Mitigation and Monitoring Plan will be prepared to summarize the project description, project location, existing jurisdictional features, project impacts, permit conditions and requirements, and proposed mitigation and monitoring frequency and schedule.
DELIVERABLES
• Draft and Final Section 404 Permit Application.
• Draft and Final Section 401 Water Quality Certification Application. • Draft and Final Section 1602 Streambed Alteration Agreement Application. • Draft and Final CVFPB Encroachment Permit Application. • Draft and Final Aquatic Resources Delineation Report. • Draft and Final Tree Survey Report.
• Draft and Final CDFW Biological Technical Report for Special-Status Species. • Notification to local agencies of the waste removal activities.
OPTIONAL DELIVERABLES
• Draft and Final USFWS Biological Assessment Report for Listed Plant and Wildlife Species.
• Draft and Final NMFS Biological Assessment Report for Listed Fish Species. • Draft and Final CDFW Section 2081 Application for Incidental Take of State Listed Species.
• Draft and Final Habitat Mitigation and Monitoring Plan.
OPTIONAL MEETINGS
• Up to 24 virtual one-hour meetings with up to two HDR personnel to discuss the various permit applications with the City.
• Up to 10 virtual one-hour meetings with up to two HDR personnel to discuss the various permit applications with the City and the resource agencies. • Meetings with the agencies include time for presentation preparation and post-meeting summaries.
KEY UNDERSTANDINGS
• Waste removal has the potential to introduce fill material toward or into the aquatic resources of the north side of the Tuolumne River. Waste removal may occur within the zone considered as navigable waters of the U.S., requiring both Section 404 and Section 401 permits as well as a CVFPB encroachment permit as this area is designated a regulated waterway.
• Temporary work activities also have the potential to impact the riparian zone, considered sensitive by CDFW, which may require permits under California Department of Fish and Game (CDFG) Section 1600-1616.
• Temporary work activities may have the potential to impact the habitats that support state and federally listed species protected under the Federal Endangered Species Act (FESA) and/or the California Endangered Species Act (CESA), including Central Valley #4..
- 287 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services steelhead, Valley elderberry longhorn beetle, Swainson’s hawk, western pond turtle, and burrowing owl, which may require incidental take permits. These are included herein as optional.
• Temporary work activities have the potential to impact the habitats that support species covered under the MBTA and/or CDFG Code 1600, including nesting birds and roosting bats, which may require biological monitoring.
• CalRecycle does not have permit requirements associated with this waste removal task. • The City will submit the Environmental Permit Information Management System (EPIMS) permit to CDFW.
• The City will provide the necessary CEQA documentation that is required for the Section 1602 Permit Application and Section 401 Water Quality Certification. If the City does not have the necessary CEQA documentation, HDR can support this effort under a separate cost and scope.
• An HDR wetland biologist will conduct a field delineation of wetlands and waters of the work area following USACE and RWQCB standards to collect data for the various permits. During the same field visit, an HDR wildlife biologist will conduct habitat assessments for specific listed species that may occur. During the same field visit, an HDR arborist will document trees in the work area that may require removal. • The work area and design of the project will be defined before HDR biologists conduct their field work and analysis for the permit applications. • The City will coordinate access to the work area.
• Inaccessible areas will be delineated via desktop.
• HDR will finalize the deliverables after receiving 1 round of comments from the City. If additional iterations of the deliverables are needed per the City’s request, an amended scope and fee would be required.
• Permit reviews and approvals by resource agencies like USACE, RWQCB, and CDFW will require approximately 9-15 months.
Task 1400: Waste Removal Oversight and Reporting
The objective of this activity is for HDR to assist the City with its compliance obligations required by the resource agencies’ permits it will likely obtain for the residual waste removal and site restoration. These compliance obligations will likely consist of the following activities:
a) Environmentally Sensitive Area Fencing Oversight: Environmentally sensitive areas identified by the HDR biologist will be avoided during project activities. These areas will be temporarily fenced and/or flagged as close to work limits as feasible. Fencing or flagging will be high-visibility and left in place for the duration of the project. The location and extent of fencing/flagging will be determined by the HDR Biologist, who will observe its installation and conduct regular inspections. The HDR biologist will demarcate the fencing location in the field with stakes and flagging. Fencing will delineate riparian habitat, nests, elderberry shrubs, pond turtle nests, or other sensitive resources. b) Conduct Worker Environmental Awareness Training: Before the onset of work activities, an HDR biologist will prepare and conduct mandatory contractor/worker environmental awareness training for personnel to inform them on the locations of sensitive biological #4..
- 288 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services resources and site-specific protective measures required during construction activities. If new personnel are added to the project, the City will require them to receive the mandatory training before starting work. Training will cover special-status species, including species identification, life-history descriptions, habitat requirements at various life stages, and the species’ protected status. The training is expected to be no more than 15 minutes and will be conducted before excavation activities. c) Nesting Bird and Raptor Surveys: Before work that will occur between March 1 and August 15, an HDR biologist will conduct pre-construction surveys for tree-nesting raptors and migratory songbirds. Nesting habitats for tree nesting raptors and migratory songbirds will be surveyed within 250 feet of the proposed construction areas. The HDR biologist will conduct Swainson’s hawk surveys per guidelines provided in the Recommended Timing and Methodology for Swainson’s Hawk Nesting Survey in the Central Valley (Swainson’s Hawk Technical Advisory Committee 2000). d) Pond Turtle Nesting Survey: Within 48 hours before project activities, a survey will be conducted for the presence of pond turtles. If nesting pond turtles are detected, exclusionary fencing in the vicinity of the nest will be used to reduce the potential for pond turtles to encroach into the work area. This fencing will be maintained throughout the duration of construction in the vicinity of the nest. The integrity of the exclusion fencing will be checked daily by a biological monitor or a designee. Additionally, HDR’s biological monitor will check the work area each morning before construction begins to confirm that no turtles are within the exclusion area. If an individual or nest is observed in the impact area, construction activities will stop until the biological monitor establishes an appropriate buffer or the turtle is no longer in the impact area. e) Roosting Bats and Maternity Colony Survey: If ground disturbing activities commence on the project site during the breeding season of native bat species (April 1 to August 31), a field survey shall be conducted by a qualified bat biologist to determine whether active roosts are present on site or within 50 feet of the project boundaries, including visual and acoustical surveys.
Field surveys shall be conducted early in the breeding season before project activities begin, when bats are establishing maternity roosts but before pregnant females give birth (April through early May). If no roosting bats are found, then no further mitigation is required. If roosting bats are found, then disturbance of the maternity roosts shall be avoided by halting project activities until the end of the breeding season, or a qualified bat biologist removes and relocates the roosting bats in consultation with CDFW through a separate permit application process. Tree removals with habitat for bats will follow the 2-day method of removal, which includes branch limbing on day 1 and trunk felling on day 2, and will be monitored by a qualified biologist.
f) Burrowing Owl Survey: Within 15 days before project activities, a survey for burrowing owls will be conducted between March and May. Fossorial mammal burrows within the work area will be examined for signs of occupation by burrowing owls including the presence of pellets, whitewash around the opening, or scattered feathers. If burrowing owls are detected, no work will occur until the burrowing owls leave or an Incidental #4..
- 289 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services Take Permit (ITP) is granted to the City by CDFW for this Project. If an ITP is pursued, no work will proceed until the City receives it.
g) Biological Monitoring during Construction: A biological monitor will be provided during construction activities. This will include monitoring-led environmental awareness training for construction workers at the start of each day and observation of biological protection measures.
h) Underground Utility Marking: As required by state law, HDR will mark the area of waste removal in white paint and notify USA North 811 to mark underground utility locations in the vicinity of the excavation.
i) Waste Removal Oversight: HDR will provide a field geologist or engineer to provide photographic and written documentation of the waste excavation.
DELIVERABLES
• Agenda will be provided before each meeting.
• Memorandum to document and summarize the results of required pre-construction surveys.
• Memorandum to document and summarize biological monitoring during waste removal. • Memorandum to document and summarize the residual waste removal and residual waste site restoration.
ASSUMPTIONS
• HDR will provide and install stakes, flagging, and fencing to delineate environmentally sensitive areas. The HDR biologist will provide oversight of the installation. • A total of 10 days is assumed for the waste removal effort. Twelve hours per day are assumed for monitoring, which includes daily travel to/from the project location. • Per the California Environmental Quality Act Initial Study prepared by the City in 2017, cultural monitoring is not required; therefore, no cultural monitor is being provided by HDR.
• A Stormwater Pollution Prevention Plan will not be required due to the planned disturbance of the waste removal being less than 1 acre or will be prepared by the contractor.
• Deliverables under this task order will be prepared and submitted electronically.
Task 1500: Remote and On-Site Meeting Support
The objective of this task is to provide in-person technical assistance to the Public Works Department in support of its presentations to City committees and/or City Council members.
This task will consist of the following activities:
• Preparation of engineering and/or regulatory permitting presentation materials in support of meetings, workshops, technical review special committee and/or City Council meetings.
#4..
- 290 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services • Meeting attendance and participation to facilitate the City’s understanding of the design strategy, permitting requirements, project schedule, and/or other project-specific information as needed.
• Preparation of meeting notes.
DELIVERABLES
• Meeting notes within five (5) days of each in-person and virtual meeting.
ASSUMPTIONS
• Three (3) virtual meetings each of one hour in duration are included.
Two (2) in-person meetings, each attended by two HDR staff in the City of Modesto, are included; each meeting is two hours in duration.
3.0 Period of Service
HDR proposes a duration for the above scope of services within two years (750 calendar days) of receiving a notice to proceed and in general conformance with the preliminary schedule outlined below:
Task Deliverable Start
(Days) Days
Task 800 Kick-off Meeting & Project Management 0 750
Task 900 Site Repair Design & Contract Documents 14 90
Task 1000 Construction Administration 180 330
Task 1100 Construction Observation 240 330
Task 1200 Revised Final Const. & Completion Report 330 390 Task 1300 Waste Removal Permitting 90 630
Task 1400 Waste Removal Oversight & Reporting 690 750
Task 1500 Remote and On-Site Meeting Support 0 750
Notes
Task 1000 (Construction Administration) starts 90 days after completion of Task 900 (Contract Documents).
Task 1100 (Construction Observation) starts 60 days after Task 1000 (Construction Administration) with a 90-day duration.
Task 1300 (Waste Removal Permitting) starts upon completion of Task 900 (Site Repair Design & Contract Documents) and requires 540 days.
Task 1400 (Waste Removal Oversight & Reporting) starts 60 days after completion of Task 1300 (Waste Removal Permitting) and requires 60 days.
4.0 Compensation
HDR proposes a not-to-exceed fee of $820,774 for the above scope of services.
Task Deliverable Fee
Task 800 Kick-off Meeting & Project Management $84,689
Task 900 Site Repair Design and Contract Documents $98,152 Task 1000 Construction Administration $133,596
Task 1100 Construction Observation $90,648
Task 1200 Revised Final Construction and Completion Report $48,951 Task 1300 Waste Removal Permitting $110,455
Task 1301 OPTIONAL Waste Removal Permitting $88,820
Task 1400 Waste Removal Oversight and Reporting $145,064 Task 1500 Remote and On-Site Meeting Support $20,399
TOTAL $820,774
#4..
- 291 -
City of Modesto | Proposal
Cover Repair Design, Contract Administration and Construction Quality Assurance Services
5.0 Total Estimated Project Costs
For the City’s budgetary planning purposes, this section presents the total estimated project costs inclusive of HDR’s cost presented in Section 4 Compensation. The total Estimated Landfill Cover Repair & Residual Waste Removal costs presented below include engineering, permitting, construction, construction oversight, and reporting. The costs are based on the fee presented in Section 4 Compensation, costs presented in the Cover Repair Alternatives Analysis dated September 19, 2025, Water Board comments regarding the extent of waste dated April 6, 2026, and escalation of the construction costs presented in the Cover Repair Alternatives Analysis.
Activity Estimated Cost
Landfill Cover Repair
Engineering & Permitting $273,492
Construction $2,844,111
Construction Oversight & Reporting $137,999
Total Landfill Cover Repair $3,255,602
Residual Waste Removal
Engineering & Permitting $241,569
Construction $810,000
Construction Oversight & Reporting $145,064
Total Residual Waste Removal $1,196,633
Total Estimated Landfill Cover Repair &
Residual Waste Removal $4,452,235
6.0 Terms and Conditions
These services are proposed to be completed as an amendment under existing Agreement #253660 for Consulting Services between the City of Modesto and HDR Engineering Inc. dated September 12, 2023.
Thank you for this opportunity to present this proposed scope of services. If you have any questions, please do not hesitate to contact Charlie O’Neill at (916) 817-4764.
Sincerely,
HDR Engineering, Inc.
Charlie O’Neill, PG Elizabeth Mesbah, PE
Project Manager Vice President
#4..