UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PR 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A
(E)400A
3P
(E)40A
3P
(E)200A
3P
(E)150A
3P
EXISTING "MS" 800 AMP, 480/277V, 3PH, 4W

LOCATED IN MAIN ELECTRICAL ROOM

SOUTH BUILDING

M (E) METER
SCE# 259000-097184

UNDER GROUND

PULL SECTION

CONNECTED

TO UTILITY

TRANSFORMER
(E)800A
3P
(E)TRANSF. "STA"
112.5 KVA
480V-120/208V
3ɸ, 4W
(E)
PANEL
"SHA"
(E)400A
3P
(E)40A
3P
(E)200A
3P
(E)125A
3P
(E)
PANEL
"ELEV"
(E)
PANEL
"SLA"
(E)
PANEL
"EQPT."
(E)
PANEL
"EQPT."
(E)
PANEL
"AC-A"
(E)TRANSF. "T-B"
75 KVA
480V-120/208V
3ɸ, 4W
(E)
PANEL
"SLA"
(E) FUSED

DISCONNECT
400A - 2P
(E) "MSB"
400A-240/120V
3ɸ-4W
(E)
PANEL
"EE09"
(E)
PANEL
"BA"
(E)
PANEL
"A"
(N)
PANEL
"SLC"
100A
3P
(E)
PANEL
"SLB"
(E)
PANEL
"SLK"
EXISTING "MSA "400 AMP,
480/277V, 3PH, 4W
1 VD=1.07%
AFC=4,136A F100 L~100FT
2 AIC=10KA
1 3
AFC=7.7KA
AIC=10KA
1 1
ELECTRICAL SINGLE LINE DIAGRAM E7.0

AND PANEL SCHEDULES

SINGLE LINE PLAN GENERAL NOTES

PLAN NOTES
ELECTRICAL SINGLE LINE DIAGRAM 1
NOTES:
1 SOME FEEDER SIZES MAY NOT BE REQUIRED FOR THIS PROJECT. 2 SIZE OF GROUNDING CONDUCTORS SHALL BE INCREASED PROPORTIONAL

TO AN INCREASE IN SIZE OF UNGROUNDED CONDUCTORS DUE TO
VOLTAGE DROP PER NEC 250.122(B)
3 CONDUIT SIZE FOR UP TO 2-1/2" SHALL BE UPGRADED TO NEXT LARGER

SIZE WHERE IT IS USED FOR UNDERGROUND INSTALLATION OR AS NOTED NEXT TO THE FEEDER DESIGNATION ON DRAWINGS.
4 MULTIPLE CONDUITS TO BE USED FOR MULTI-SET CONDUCTORS.

QUANTITY OF CONDUITS TO BE SAME AS # OF SETS.

LOW VOLTAGE FEEDER SCHEDULE (COPPER)
THHN/THWN-2 FOR #4 AND SMALLER
XHHW-2 for #2 and LARGER
MAX
OCPD

FEEDER TAG SETS CONDUCTORS GROUND CONDUIT
(QTY)SIZE SIZE SIZE
40A F40 1 (4)#8 #10 1"
F40A 1 (3)#8 #10 1"
60A F60 1 (4)#6 #8 1"
F60A 1 (3)#6 #8 1"
70A F70 1 (4)#4 #8 1-1/4"
F70A 1 (3)#4 #8 1-1/4"
150A F150 1 (4)#1/0 #6 2"C
F150A 1 (3)#1/0 #6 2"C
175A F175 1 (4)#2/0 #4 2"C
F175A 1 (3)#2/0 #4 2"C
200A F200 1 (4)#3/0 #4 2-1/2"
F200A 1 (3)#3/0 #4 2"
225A F225 1 (4)#4/0 #2 2-1/2"
F225A 1 (3)#4/0 #2 2-1/2"
250A F250 1 (4)250MCM #2 3"
90A F90 1 (4)#2 #8 1-1/2"
F90A 1 (3)#2 #8 1-1/4"
100A F100 1 (4)#1 #6 1-1/2"
F100A 1 (3)#1 #6 1-1/2"
110A F110 1 (4) #1 #6 1-1/2"
F110A 1 (3)#1 #6 1-1/2"
125A F125 1 (4)#1/0 #6 2"C
F125A 1 (3)#1/0 #6 2"C
F250A 1 (3)250MCM #2 2-1/2"
300A F300 1 (4)350MCM #2 3-1/2"
F300A 1 (3)350MCM #2 3"
350A F350 1 (4)400MCM #1/0 3-1/2"
F350A 1 (3)400MCM #1/0 3"
400A F400 1 (4)600MCM #1/0 4"
F400A 1 (3)600MCM #1/0 4"
450A F450 2 (4)#4/0 #2 2-1/2"
F450A 2 (3)#4/0 #2 2-1/2"
F800X 2 (4)600MCM #3/0 4"
1000A F1000 3 (4)400MCM #2/0 3-1/2"
F1000A 3 (3)400MCM #2/0 3"
F1000X 3 (4)400MCM #3/0 3-1/2"
500A F500 2 (4)250MCM #2 3"
F500A 2 (3)250MCM #2 2-1/2"
F500X 2 (4)250MCM #1/0 3"
600A F600 2 (4)350MCM #2 3-1/2"
F600A 2 (3)350MCM #2 3"
700A F700 2 (4)500MCM #1/0 4"
F700A 2 (3)500MCM #1/0 4"
800A F800 2 (4)600MCM #1/0 4"
F800A 2 (3)600MCM #1/0 4"
30A F30 1 (4)#10 #12 1"
F30A 1 (3)#10 #12 1"
1 1
1

Page 52 of 840 ends

UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PR 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A
1A 2A 3A

ELEVATION SIDE VIEW

ELECTRICAL DETAILS
E8.0

Page 53 of 840 ends

UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PR 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A
115 S TAYLOR AVE, MONTEBELLO, CA 90640
115 S TAYLOR AVE, MONTEBELLO, CA 90640
619-694-9495
E-23582
04-13-2026
18528 LOCKSLEY STREET
SAN DIEGO CA 92128

ARIA ENGINEERING GROUP
18528 LOCKSLEY STREET
SAN DIEGO CA 92128 619-694-9495
04-13-2026
INTERIOR TITLE 24 CALCULATIONS E9.0

ARIA ENGINEERING GROUP
1 1

Page 54 of 840 ends

UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PR 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A
115 S TAYLOR AVE, MONTEBELLO, CA 90640
619-694-9495
E-23582
02-24-2025
18528 LOCKSLEY STREET
SAN DIEGO CA 92128

ARIA ANSARI

ARIA ENGINEERING GROUP
18528 LOCKSLEY STREET
SAN DIEGO CA 92128 619-694-9495
02-24-2025
115 S TAYLOR AVE, MONTEBELLO, CA 90640
EXTERIOR TITLE 24 CALCULATIONS E10.0

Page 55 of 840 ends

MECHANICAL SYMBOL, GENERAL P1.0

NOTES AND SCHEDULES

SCOPE OF WORK

GENERAL PLUMBING NOTES

TYPICAL WATER CALCULATIONS

WATER PIPE SIZING
FIXTURE UNITS VERSUS FRICTION LOSS(PSI/100 FT)

TYPE L COPPER
MINIMUM PLUMBING FACILITIES 2022 CPC 422.1

FIXTURE SCHEDULE
FIXTURE UNIT CALCULATION CPC 2022 TABLE A103.1

GREEN BUILDING NOTES
1 UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A

SHEET INDEX
1

Page 56 of 840 ends

UP
FD
FD
FD

FD FACP

FACP FACP
WH-2
WH-1
(E)2" DOMESTIC

WATER FROM CITY GM
POD
(E)GAS SERVICE

REGULATOR

FISHER CONTROLS

2.5-5.6 PSI (E)GAS REGULATOR

AMERICAN METER

5.5-8.5 IN. WC
(E)GAS METER 1500
CFH @ 2.5-5.6 PSI
ROOTS METER 15C175

DOMESTIC WATER

FROM CITY
CW-UG
BFP
WM
(E)3" RPBFP REDUCED

PRESSURE PRINCIPLE

BACKFLOW PREVENTER
ZURN 375
(E)2" WATER

METER SENSUS
(E)2" DOMESTIC WATER FROM
CITY 68-70 PSI AS PER WATER

DEPARTMENT CONFIRMATION
DF-1
MS-1
LV-1 LV-1
FD-1
FS-1
FS-1
UR-1
S-3
S-1
WC-1 WC-1 WC-1
LV-1
LV-1
FD-1
FD-1
WC-1
WC-1
PLUMBING COLD WATER , HOT WATER AND GAS - DEMO P2.0
UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A

Page 57 of 840 ends

UP
FD
FD
FD

FD FACP

FACP FACP
FD-1
FS-1
FS-1
FD-1
FD-1

POD WCO
DF-1
LV-1 LV-1
MS-1
POD
WH-1 WC-1 WC-1 WC-1
(E)FCO
WC-1
S-3
S-1 (E)FCO
UR-1
(E)FCO
WCO

WCO POD
POD
LV-1
LV-1
WC-1
WCO
(E)FCO
(E)4" SANITARY

SEWER FROM
CITY
PLUMBING SEWER AND VENT - DEMO P2.1
1 1
1 UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A

Page 58 of 840 ends

UP 3
8 " CW
RF-1 S-1
1 2
" HW
1 2
" CW
MS-1
3 4
" CW
3 4 WH-1 " HW
LV-1
LV-1
WC-1
2" CW
3 4
" HW
3 4
" G
WC-1 WC-1
FD-1
1-1/4" CW
WHA-1
(E)2" DOMESTIC

WATER FROM CITY
DF-1
1 2
" CW
LV-1
LV-1
UR-1
FD-1
1 2
" T.P
1" CW
2" CW
WC-1
WHA-1
1-1/4" CW
2" CW
1-1/4" CW
GM
POD
(E)GAS SERVICE

REGULATOR

FISHER CONTROLS

2.5-5.6 PSI
(E)GAS REGULATOR

AMERICAN METER

5.5-8.5 IN. WC
(E)GAS METER 1500
CFH @ 2.5-5.6 PSI
ROOTS METER 15C175

DOMESTIC WATER

FROM CITY
CW-UG
BFP
WM
(E)3" RPBFP REDUCED

PRESSURE PRINCIPLE

BACKFLOW PREVENTER
ZURN 375
(E)2" WATER

METER SENSUS
(E)2" DOMESTIC WATER FROM
CITY 68-70 PSI AS PER WATER

DEPARTMENT CONFIRMATION
(NEW)
PLUMBING COLD WATER, HOT WATER AND GAS - NEW P3.0
1 1
UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A

Page 59 of 840 ends

UP
WH-1
S-1
MS-1
LV-1
LV-1
2" SS
3" SS
3" SS
FD-1
FD-1
WC-1 WC-1
WC-1
2" SS
4" SS
(E)FCO
WC-1
(E)4" SANITARY

SEWER FROM
CITY
AHU
1 AHU
2 (NEW)
(NEW CONNECTION)
2" SS
DF-1
(E)FCO
FD-1
WC-1
LV-1
LV-1
UR-1
PLUMBING WASTE AND VENT -NEW P3.1
1 1
1 UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128
1 04/13/2026 REVISION 1 E&A

Page 60 of 840 ends

H: 8'-4"
H: 9'-2"
H: 9'-2"
1 1
2 2
WC-1 WC-1
FD-1 FD-1
WC-1 WC-1
WC-1 UR-1
L-1 L-1
FD-1 FD-1
L-1 L-1
CO
4" SS T/B
4"SS
4"SS
2"SS
2"SS
1 2 3
1 2 3
4 5
5 1 2 3
PLUMBING WASTE & VENT - DEMO & NEW P3-1.0
UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128

1. 04/13/2026 REVISION 1 E&A 1
1 2
1 2
3 4
5

Page 61 of 840 ends

H: 8'-4"
H: 9'-2"
H: 9'-2"
1 1
WC-1 WC-1
WC-1 WC-1
WC-1 UR-1
L-1 L-1
L-1
L-1
FD-1 FD-1
FD-1 FD-1
1 2
" TP
1 2
" TP
1 2
" TP
1 2
" TP
1-1/4"CW
1-1/2"CW
(E)1-1/2"CW F/B
(E)1/2"HW F/B
1-1/2"CW
2 4 6 7 8
5 3 1 1 3 5
5 3 1 1 3 5
1 3 5
2 4
1 3 5
1 3 5
2 4 (E) (E) (E)
(E)
(E)

PLUMBING COLD & HOT WATER - DEMO & NEW
UNDER THE SUPERVISION OF: Sheet Number:

Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
P.N.: 2.1000.03
NO. DATE DESCRIPTION

REVISIONS CITY OF MONTEBELLO SENIOR CENTER REMODEL
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT 115 S Taylor Ave, Montebello,CA 90640

CONSULTING

ENGINEERS

MECHANICAL - ELECTRICAL - PLUMBING
18528 LOCKSLEY STREET SAN DIEGO CA 92128

1. 04/13/2026 REVISION 1 E&A
P3-1.1
1 1
1 2
3 4
5 6
7 8

Page 62 of 840 ends

UNDER THE SUPERVISION OF: Sheet Number:

DESIGNED BY:

DRAWN BY:

CHECKED BY: DATE: Department of Public Works

ATTENTION IS DIRECTED TO THE POSSIBLE EXISTENCE OF UNDERGROUND FACILITIES NOT

SHOWN OR IN A LOCATION DIFFERENT FROM WHAT IS SHOWN ON THE PLANS OR IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL TAKE STEPS TO ASCERTAIN THE EXACT

LOCATION OF ALL UNDERGROUND FACILITIES PRIOR TO START OF WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICES. BEFORE EXCAVATION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES BY CONTACTING UNDERGROUND UTILITIES SERVICE ALERT AT 1 (800) 422-4133.

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
iArch
iArch
iArch

INFRASTRUCTURE ARCHITECTS
100 Progress,Suite 110,Irvine,CA 92618
www.infrastructurearchitects.com
P.N.: 2.1000.03
NO. DATE BY DESCRIPTION APPROV.

REVISIONS
iARCH

CITY OF MONTEBELLO
115 South Taylor Ave. , Montebello , CA 90640

SENIOR CENTER RENOVATION
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT

MECHANICAL &

PLUMBING ENGINEERS
12208 WITT ROAD,
POWAY, CA92064
(949)241-7796
EXP. 06-30-2025 No.40394

SHAYAN ZOLGHADR

REGISTERED PROFESS IONAL

ENGINE R
STAT E OF CA L I FORN I 3-5-25 A
P4.0

TANK SEISMIC RESTRAINT

NOT TO SCALE

ANCHOR TANK LEGS TO FLOOR OR PLATFORM OR AS REQUIRED BY LOCAL CODE AUTHORITIES.

SET TANK AS CLOSE TO WALL AS POSSIBLE.

PROVIDE WOOD BLOCKS FOR SPACERS
BETWEEN WALL AND TANK IF REQUIRED.

ATTACH TO WALL AS REQUIRED (TYP FOR 2)
PROVIDE 1"x
1 8" STEEL BAND DOWN 1/3 FROM
THE TOP, AND UP 1/3 FROM THE BOTTOM OF
TANK. BEND ENDS OF STRAP AND ANCHOR
SECURELY TO WALL AS REQUIRED. (TYP FOR 2)
WATER
HEATER

OR TANK
07 PIPE OVER FOUR INCH

CLEVIS HANGER FOR
PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER. DO NOT HANG ONE PIPE FROM ANOTHER EXCEPT IN CHASES. TRAPEZE HANGERS MAY BE USED FOR MULTIPLE PARALLEL PIPES. HANGER SPACING FOR PIPE SIZE: COPPER:
4"=12'-0"; 3"=11'-0"; 2
1 2"=10'-0"; 2"=9'-0"; 1
1 2"=8'-0"; 1
1 4"=7'-0"; 1" & 34"=6'-0"; 12"=5'-0". CAST IRON:
10'-0" AND ONE NEAR ALL JOINTS. STEEL: 4"=14'-0"; 3"=12'-0"; 2 1 2"=11'-0"; 2"=10'-0"; 1
1 2"=9'-0";
1"=7'-0"; 3
4"=6'-0"; 12
"=5'-0". LOCATE HANGERS AS CLOSE AS POSSIBLE TO TURNS AND TEES OF PIPE. PROVIDE SUPPLEMENTARY STEEL STRUTS BETWEEN JOISTS IF REQUIRED. LOCATE HANGERS TO TAKE LOAD OFF OF EQUIPMENT CONNECTIONS.

ANCHOR WATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY.

PROVIDE SEISMIC BRACING IF/AS REQUIRED BY LOCAL AUTHORITIES. CHAINS OR PERFORATED STRAP IRON OR STEEL IS NOT ACCEPTABLE. REFER TO CODES FOR FURTHER INFORMATION.

ADJUSTABLE

BAND HANGER

FOR PIPING

FOUR INCH OR
LESS

TOP BEAM

C-CLAMP IF

STEEL BAR
JOIST
STEEL
DECK
ALL-THREAD ROD.

LENGTH AS REQ'D

FOR PIPE SLOPE

PROVIDE COPPER

OR NON-METALLIC

COATING WHERE

HANGERS CONTACT

BARE COPPER PIPE

PIPE HANGERS

NOT TO SCALE

DO NOT HANG PIPE
LARGER THAN 3" FROM
BOTTOM OF JOISTS.
03 URINAL

LAVATORY

TANK WATER CLOSET

JANITOR'S SINK

PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI #WH-201, ASSE #1010 OR ANSI #A112.26.1M CERTIFICATION.

SIZE AND INSTALL PER PDI #WH-201 STANDARD OR MANUFACTURER'S INSTRUCTION. THE TABLES ABOVE ARE BASED ON THE SIOUX CHIEF PRODUCT LINE. IF PRESSURE IS IN EXCESS OF 65 PSIG THEN UPSIZE THE ARRESTER BY ONE (EXAMPLE: AN 'A' ARRESTER WOULD BECOME A 'B' ARRESTER.)

UNIT LOAD

PDI FIXTURE
SIZE

SINGLE FIXTURE
3 3

MULTIPLE FIXTURES

FIXTURE UNIT TABULATION

FIXTURE

1.5 -
- HOT

1.5 5
5 COLD

WATER HAMMER ARRESTERS

NOT TO SCALE
AA
A
B
C
D
1-3
4-11
12-32
33-60
61-113
ON HORIZONTAL BRANCH LINE LESS THAN 20

FEET LONG, PLACE ONE WITHIN SIX FEET OF

THE LAST FIXTURE SERVED
ON BRANCH LINE GREATER THAN 20 FEET

LONG, PLACE ANOTHER ARRESTER IN THE

MIDDLE, EACH IS SIZED FOR HALF THE

FIXTURE UNITS
HOT OR
COLD
WATER
SUPPLY

ARRESTER

WITHIN SIX

FEET OF

FIXTURE
SERVED
DRINKING FOUNTAIN 0.5 - 04

PROVIDE FIBERGLASS INSULATION WITH ALL-SERVICE JACKET WITH VAPOR BARRIER ON ALL COLD/HOT WATER PIPING AND CONDENSATE DRAIN PIPE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION REGARDING INSULATION. INSTALL ALL ITEMS PER SPECIFICATIONS AND MANUFACTURERS INSTRUCTIONS. MAINTAIN VAPOR BARRIER ON COLD PIPING BY MEANS OF SEALANT AND TAPE. FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES SHALL NOT EXCEED 25/50. SEAL EXPOSED ENDS OF FIBERGLASS INSULATION WITH ADHESIVE MASTIC.

REFER TO OTHER DETAILS

FOR TREATMENT OF

INSULATION AT PENETRATION

OF WALLS AND FIREWALLS

PIPE INSULATION

NOT TO SCALE

PROVIDE INSULATION ON DOMESTIC

HOT/COLD WATER PIPES, STORM WATER

PIPES, AND CONDENSATE DRAIN PIPING IN

WALLS AND CHASES

MITER THE INSULATION AT TEES AND

ELBOWS SO THAT THERE ARE NO GAPS AT
JOINTS. PROVIDE ONE-PIECE PRE-MOULDED

PVC FITTING COVERS

PROVIDE A ONE FOOT

LENGTH OF

NON-COMPRESSIBLE

INSULATION AT HANGERS
FOR ALL PIPE 2" AND
LARGER

COVER VALVE BODIES WITH INSULATION, BUT NOT UNIONS

TAPE JOINTS OF

FIBERGLASS

INSULATION
FLOOR
02 MINIMUM 12" BELOW ROOF

ROOF INSULATION
MINIMUM 12" ABOVE ROOF

ROOF DECK

REFER TO ARCHITECT'S

DRAWING FOR APPLICATION

OF VENT PIPE BOOT

INSTALLATION WITH ROOFING

MATERIAL

PROVIDE SLEEVE IF

REQUIRED BY TYPE

OF ROOF DECK

PROVIDE PIPE INCREASER

WHERE REQUIRED TO MAKE
MINIMUM 3" VENT THRU ROOF

ANCHOR PIPE TO ROOF DECK OR

JOISTS WITH U-BOLT AROUND PIPE

AND ANGLE IRON WELDED OR

SCREWED TO DECK OR JOIST

HUBLESS PIPE CONNECTORS

ON CAST IRON PIPE
REFER TO PLANS FOR VTR PIPE SIZES AND LOCATIONS. LOCATE VTR A MINIMUM OF 20 FEET

HORIZONTAL (UNLESS APPROVED BY ENGINEER PRIOR TO INSTALLATION) OR THREE FEET

VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, AND ONE FOOT FROM ANY VERTICAL SURFACE. PROVIDE 1" FIBERGLASS INSULATION WITH ALL-SERVICE JACKET ON VENT PIPE INSIDE BUILDING WITHIN SIX FEET OF VENT THRU ROOF LOCATION. VERIFY FLASHING AND COUNTERFLASHING WITH ROOFING CONTRACTOR.

VENT THRU ROOF (VTR)

NOT TO SCALE

PROVIDE ONE PIECE SPUN ALUMINUM BASE WITH, GRADUATED STEPPED PVC BOOT, AND ADJUSTABLE STAINLESS STEEL CLAMPS. SET BASE IN

BED OF MASTIC
01 MAKE CONNECTION TO

EQUIPMENT AS REQUIRED

SLOPE PIPE AS

MUCH AS POSSIBLE
TOWARD

DISCHARGE
IW

PROVIDE CLEANOUTS IN TURNS/ENDS OF
PIPE. USE DWV FITTINGS IF SIZE IS
LARGER THAN 1"

VERIFY WITH LOCAL CODES

IF/WHEN TRAP AND/OR VENT ARE

REQUIRED FOR THE LENGTH OF

DRAIN PIPE INSTALLED

DISCHARGE INTO CENTER HOLE OF

GRATE OF WASTE RECEPTACLE WITH

AIR GAP SUFFICIENT TO REMOVE
GRATE AND STRAINER. MINIMUM GAP
= TWO PIPE DIAMETERS

INDIRECT DRAIN

NOT TO SCALE

MAKE PIPE MINIMUM ONE SIZE LARGER

THAN EQUIPMENT CONNECTION, MINIMUM
3 4". USE TYPE "M" HARD COPPER UP TO 1"

AND TYPE DWV FOR LARGER
ROUTE PIPE INCONSPICUOUSLY AND UNOBTRUSIVELY. HANG PIPE AS REQUIRED. DO

NOT INSULATE INDIRECT DRAIN PIPE WHEN INSTALLED EXPOSED IN FOOD SERVICE FACILITY. REFER TO LOCAL CODES FOR FURTHER INFORMATION. 06 PIPE
SIZE

SPACING TRANSVERSE
BRACE

LONGITUDINAL
BRACE
BOLT
SIZE
ROD
SIZE

MAX ROD

LENGTH VERTICAL BRACE
TR. LO.
1"-2" 20' 20' 2"X2"X18GA 2"X2"X18GA 1
4" 3
8" 20" 2"X2"X18GA
2 1
2"-3" 40' 40' 2
1 2"X212"X16GA 2
1 2"X212"X16GA 3
8" 1
2" 25" 2"X2"X16GA
4"-5" 40' 40' 2
1 2"X212"X16GA 2
1 2"X212"X16GA 1
2" 5
8" 31" 2"X2"X16GA
6" 40' 40' 2
1 2"X212"X12GA 2
1 2"X212"X12GA 1
2" 34" 37" 2
1 2"X212"X16GA
8" 40' 40' 2
1 2"X212"X12GA 2
1 2"X212"X12GA 5
8" 78" 43" 2
1 2"X212"X12GA
10" 20' 20' 2
1 2"X212"X12GA 2
1 2"X212"X12GA 3
4" 7
8" 43" 2
1 2"X212"X12GA
DO NOT BRACE ANY PIPES WHERE TOP OF PIPE TO BOTTOM OF UPPER ATTACHMENT IS LESS THAN 12". BRACE GAS, OIL AND AIR PIPES 1" AND LARGER. BRACE ALL PIPES IN EQUIPMENT ROOMS 1-1/4" AND LARGER. BRACE ALL OTHER PIPE 2-1/2" AND LARGER. BRACE HUBLESS CAST IRON PIPE ON EACH SIDE OF ANY CHANGE IN DIRECTION OF 90 DEGREES OR MORE. MAXIMUM HANGER ROD LENGTH IS 6 FEET. WHERE LENGTH OF RUN EXCEEDS LONGITUDINAL BRACE SPACING, PROVIDE 2 FEET OFFSET IN PIPE AND LOCATE BRACE AT MID RUNS. REFER TO CURRENT EDITION OF SMACNA "SEISMIC RESTRAINT MANUAL" FOR ALTERNATIVE ATTACHMENTS AND ADDITIONAL INFORMATION AND REQUIREMENTS. (THIS DETAIL APPLIES IN THE ABSENCE OF OTHER LOCAL CODE REQUIREMENTS.)

STANDARD STEEL PIPE CLAMP

TRANSVERSE BRACE
4" MAXIMUM TYPICAL ALL BRACES
2 MAX.
1 MIN.
1 LONGITUDINAL BRACE
1 MIN.
2 MAX.

WELD
1/8" 1"-24"
STEEL
BEAM

CONCRETE
1 WOOD BEAM

PROVIDE ROD SIZE TABULATED, WITH VERTICAL
BRACE IF ROD LENGTH EXCEEDS TABULATION.

ANGLE IRON BRACE AND
BOLTS PER TABLE (TYP.)

STEEL JOIST

PIPE HANGER

PER OTHER
DETAIL
DRILLED IN THREADED INSERT. DO
NOT USE SHOT-IN INSERTS.

BOLT (WITH TWO

WASHERS) BETWEEN

JOIST MEMBERS

BOLT (WITH TWO

WASHERS) NEAR

TOP OF BEAM

SEISMIC BRACING FOR PIPE

NOT TO SCALE

BOLT (WITH TWO

WASHERS) NEAR

TOP OF BEAM

UPC ZONE
3 OR 4;
SMACNA
SHL-A
05 09
TRAP PRIMER 08 REFER TO SHEET P2.0

GREASE INTERCEPTOR
REFER TO SHEET P3.0

PLUMBING DETAILS

Page 63 of 840 ends

i

CITY OF MONTEBELLO

CALIFORNIA

CONTRACT DOCUMENTS

SPECIFICATIONS AND STANDARD DRAWINGS
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925
GEORGINA TAMAYO – MAYOR
DANIELLE ROMERO – MAYOR PRO TEM
SCARLET PERALTA – COUNCILMEMBER
RIC ALONZO – COUNCILMEMBER
SALVADOR MELENDEZ – COUNCILMEMBER
RAUL ALVAREZ – CITY MANAGER
CESAR ROLDAN – DIRECTOR OF PUBLIC WORK
PREPARED BY:

Bid Opening: October 7, 2026 at 11:00 AM
Engineer’s Estimate: $1,185,581
THIS PROJECT IS SUBJECT TO PROJECT LABOR AGREEMENT NO. 4202 Attachment B

Page 64 of 840 ends

ii

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO

BID SCHEDULE
• Bid Period - August 27, 2026 to October 7, 2026 at 11:00 a.m. • Mandatory Job Walk at the Senior
Center (115 S. Taylor Avenue,
Montebello, CA 90640 - September 23, 2026 at 10 a.m.
• Request for Information submittal - September 28, 2026 at 12:00 p.m. • Request for Information responses - October 1, 2026 at 5:00 p.m. • Bid Opening - October 7, 2026 at 11:00 a.m.
• Award of Contract - October 28, 2026 City Council meeting (Tentative) • Project Commencement Date - Mid to late November 2026 Bid proposals will be received via PlanetBids
https://www.montebelloca.gov/cms/one.aspx?portalId=58756&pageId=84839 until 11:00 a.m. on October 7, 2026.

These Specifications have been prepared
under the direction of:

Mohamad J. Farahani, P.E.

Page 65 of 840 ends

iii

CITY OF MONTEBELLO

CALIFORNIA
TO PROSPECTIVE BIDDERS:

The City of Montebello invites you to become a prospective bidder on one of its public projects.

It is the City’s intention to provide you with thorough and complete information regarding this project and to present an accurate description of the necessary work so that you may successfully bid and construct the project.

Submittal of your bid assumes that you have made a thorough and complete investigation of the project site and that you have discovered no apparent discrepancies between the scope of work set forth in the plans and specifications and the actual field conditions.

If there are any questions regarding this project, please contact the City Engineer’s office at (323) 887-1200, ext. 1460.

Cesar Roldan
Director of Public Works

Page 66 of 840 ends

iv

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO

TABLE OF CONTENTS
NOTICE INVITING SEALED BIDS A-1 to A-3
INSTRUCTIONS TO BIDDERS B-1 to B-3
BID PROPOSAL C-1 to C-28
STANDARD PUBLIC WORKS AGREEMENT D-1 to D-18

SPECIAL PROVISIONS
PART 1 - GENERAL PROVISIONS GP-1 to GP-42
PART 2 – BID ITEM DESCRIPTION BD-1 to BD-3
STANDARD PLANS APPENDIX “A”
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) APPENDIX “B”

CONTRACTOR REGISTRATION NUMBER FORM
PROJECT SIGNS APPENDIX “C”
PROJECT LABOR AGREEMENT NO. 4202 APPENDIX “D”

Page 67 of 840 ends

A-1

NOTICE INVITING SEALED BIDS
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
PUBLIC NOTICE IS HEREBY GIVEN that the City of Montebello as AGENCY, invites sealed bids for the above stated project and will receive such bids electronically ONLY through PlanetBids, https://www.montebelloca.gov/cms/one.aspx?portalId=58756&pageId=84839, by 11:00 am on October 7, 2026.

SCOPE OF WORK: The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the above stated project. It is the intent of this contract to have the contractor perform the “Project”, and other appurtenances in accordance with the 2012 Standard Plans for Public Works Construction (SPPWC), 2018 Standard Specifications for Public Works Construction “Greenbook” and 2018 Caltrans Standard Plans and Specifications unless otherwise shown.

CONTRACT DOCUMENTS:

Copies of the contract documents and specifications are available through PlanetBids.

In order to be on the Planholder List for this project, each bidder must submit a Bidders Information Sheet through PlanetBids. Bids will not be accepted unless the bidder is on the Planholder List. All questions from planholders, are to be posted on PlanetBids.

Questions: All questions related to this project prior to the opening of bids shall be submitted electronically and received no later than 12:00 p.m. on September 28, 2026.

PREVAILING WAGE:

Pursuant to Section 1770, et seq., of the California Labor Code, the Contractor shall pay the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations of the State of California for the locality where the work is to be performed. A copy of said wage rates is available on-line at: B-2 www.dir.ca.gov/dlsr/DPreWageDetermination.htm.

The Contractor and any subcontractors shall pay not less than said specified rates and shall post a copy of said wage rates at the project site. Federal Labor Standards Provisions, including prevailing wage requirements of the Davis-Bacon and Related Acts will be enforced. In the event of a conflict between Federal and State wages rates, the higher of the two will prevail.

LABOR COMPLIANCE:

To comply with SB 854, beginning January 1, 2015 the following applies:

Page 68 of 840 ends

A-2

1. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

2. No contractor or subcontractor may be awarded a contract for public works on a public works project awarded on or after April 1, 2015, unless registered with the DIR.

3. The project is subject to compliance monitoring and enforcement by the DIR.

4. Require the prime contractor to post job site notices prescribed by regulation (regulation not created yet) or the City must post the notices itself.

The Contractor shall fill in the Department of Industrial Relations (DIR) Contractor Registration Number Form provided in Appendix “B” and submit it with the sealed Bid.

The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, marital status or religion in any consideration leading to the award of contract.

In entering into a public works contract, or subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or the Subcontractors, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) of under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public work contract or the subcontract. This assignment shall be made and become effective as the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties.

Bids must be prepared on the approved Proposal forms in conformance with the “Instructions to Bidders” and submitted electronically. The bid must be accompanied by certified or cashier’s check, or bidder’s bond, made payable to the AGENCY for an amount no less than ten percent of the amount bid.

Bidders must hold a valid California Class A Contractor’s License.

No bid will be accepted from a Contractor who has not been licensed in accordance with provisions of the Business and Professions Code. The successful Contractor and his subcontractors will be required to possess business licenses from the City.

The AGENCY will deduct five percent (5%) retention from all progress payments as specified in Section 7-3.2 of these Specifications. The Contractor may substitute an escrow holder surety of equal value to the retention and the Contractor shall be beneficial owner of the surety and shall receive any interest thereon.

Page 69 of 840 ends

A-3
The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids, under advisement for a period of sixty (60) days.

The contract period for this project is seventy-five (75) working days from the effective date of the Notice-to-Proceed to be issued by the City.

BY ORDER OF: The City of Montebello, California
___________________________
Christopher Jimenez, City Clerk

Page 70 of 840 ends

B-1

INSTRUCTIONS TO BIDDERS
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO

GENERAL INFORMATION
ELECTRONIC proposals, including all documents required to be submitted with the bid, will be received until the date and time specified in the legal notice or addendum to the project documents, whichever occurs latest, for the construction of work described in the project documents or said legal notice.

In addition to the Proposal Documents described in the ‘INVITATION TO BIDDERS’, the City Clerk’s Department will be requesting the fully executed original Bid Bond from all considered bidders and shall be delivered to the Montebello City Clerk‘s Office the same day the Bid is due.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

No contractor or subcontractor may be listed on a bid proposal for a Public Works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

No contractor or subcontractor may be awarded a contract for public work on a Public Works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

PROPOSAL FORMS
Bids shall be submitted directly through PlanetBids:
https://www.montebelloca.gov/cms/one.aspx?portalId=58756&pageId=84839 and contractors must use the Proposal forms provided by the AGENCY (contained within these contract specifications). All information requested therein must be clearly and legibly set forth in the manner and form indicated. The AGENCY will not consider any proposal not meeting these requirements.

PROPOSAL GUARANTEE
Proposals must be accompanied by a proposal guarantee consisting of a certified or cashier’s check or bid bond payable to the AGENCY in the amount not less than ten percent of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to execute the contract documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall

Page 71 of 840 ends

B-2
be forfeited to the AGENCY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all contract documents.

DELIVERY OF PROPOSAL
Bids shall be submitted directly through:
https://www.montebelloca.gov/cms/one.aspx?portalId=58756&pageId=84839 by 11:00 am on October 7, 2026. It is the bidder’s responsibility to ensure the bids have been successfully submitted through PlanetBids. Late proposals will not be considered.

WITHDRAWAL OF PROPOSALS
A proposal may be withdrawn by a written request signed by the bidder. Such requests must be delivered to the AGENCY’s designated official prior to the bid-opening hour stipulated in the Notice Inviting Sealed Bids. Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee. The withdrawal of the proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so.

IRREGULAR PROPOSALS
Unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested.

No oral, telegraphic, telephonic, facsimile or electronic proposal, modification or withdrawal will be considered.

TAXES
No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable.

DISQUALIFICATION OF BIDDERS
In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor. No proposal will be accepted from a bidder who has not been licensed in accordance with the provisions of the State Business and Professions Code.

DISCREPANCIES AND MISUNDERSTANDINGS
Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other contract documents and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed.

No bidder shall at any time after submission of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the

Page 72 of 840 ends

B-3
Plans, Specifications, or other contract documents shall be called to the attention of the AGENCY and clarified prior to the submission of proposals.

EQUIVALENT MATERIALS
Although the bidder may believe that by use of a different material than that specified on/in the plans and specifications, a lower cost project/bid may result. The bidder is to bid the project on the basis of using the material(s) as named keeping in mind that all materials named herein by manufacturer is not to prohibit the bidder considering using in his bid what he considers to be an equal material except where the AGENCY has designated a sole product. Once the bids have been opened the successful Contractor may discuss with the AGENCY the use of another product, which may result in a determination by the AGENCY that the other product is equal and possibly that by the AGENCY allowing the use of the Contractor proposed equal that a change in the contract amount may result.

LEGAL RESPONSIBILITIES
All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same or expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and other contract documents, and to full compliance therewith.

AWARD OF CONTRACT
The award of contract, if made, will be to the lowest responsible bidder as determined solely by the AGENCY. Additionally, the AGENCY reserves the right to accept or reject any or all proposals, to waive any irregularity, and to make an award as may best serve the interests of the AGENCY.

SURETY BOND PERIOD
Surety Faithful Performance Bond shall be maintained for one (1) year after completion of project construction.

Page 73 of 840 ends

C-1

PROPOSAL
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
TO THE CITY OF MONTEBELLO, as AGENCY
In accordance with AGENCY’s Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor and to perform all work in the manner and time prescribed therein.

BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instruction to Bidders, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guarantee accompanying this proposal. This bid may not be withdrawn within a period of sixty (60) days after the date of its proper opening by the City.

BIDDER understands that a bid is required for the entire work and that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE

AGENCY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures.

If awarded the Contract, the undersigned further agrees that in the event of the BIDDER’s default in executing the required contract and filing the necessary bonds and insurance certificates within ten (10) working days after the date of the AGENCY’s notice of award of contract to the lowest responsive BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY’S option, be considered null and void.

The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable by

Page 74 of 840 ends

C-2
the engineer. All bids will be compared on the basis of the Engineer’s estimated quantities of work to be performed.

The contractor’s attention is directed to both sec. 7-3.5.2 “Increases of more than 25 percent” and sec. 7-3.5.3 “Decreases of more than 25 percent” of the Standard Specifications which have been eliminated and are replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.

The bidder agrees that in case of not executing the required contract with necessary bonds within ten (10) working days, after having received notice that the contract is ready for signature, the proceeds of the check or bond accompanying his/her bid shall become the property of the City of Montebello.

The bidder also certifies that the bid is a balanced bid. In accordance with section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct.

Page 75 of 840 ends

C-3

BID PROPOSAL
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
The undersigned declares that he has carefully examined the location of the proposed work, that he has examined the specifications and read the accompanying instructions to bidders, and hereby proposes to do all the work in accordance with said specifications for the amounts set forth below:

Construct improvements as reiterated above, located in the City of Montebello, California, in accordance with the specifications for the unit price set forth in the following items:

BASE BID ITEMS:

Item
No.

Item Description Qty. Unit Amount
Mobilization And Demobilization 3%
Demo Phase - First Floor
1 DEMOLISH EXISTING FLOOR TILE THROUGHOUT THE

SCOPE OF WORK AND MORTAR BED DOWN TO THE
CONCRETE SLAB. SAW CUT AND REMOVE PORTIONS OF

THE EXISTING SLAB AS REQUIRED FOR INSTALLATION
OF NEW FLOOR DRAINS.
4500 SF
2 DEMOLISH AND PROPERLY DISPOSE OF DESIGNATED
WALLS AS INDICATED WITH DASHED LINES. 1 LS
3 REMOVE ALL EXISTING DESIGNATED DOORS AND
INDICATED WITH DASHED LINES. 1 LS
4 REMOVE ALL EXISTING DESIGNATED WINDOWS AND
INDICATED WITH DASHED LINES. 1 LS
5 REMOVE ALL EXISTING PLUMBING FIXTURES AND
MISCELLANEOUS PER PLUMBING DRAWINGS. 1 LS
6 REMOVE ALL EXISTING LIGHTING FIXTURES, WRINGING
AND MISCELLANEOUS PER ELECTRICAL PLANS. 1 LS
7 DEMOLISH AND PROPERLY DISPOSE ALL EXISTING WALL

AND FLOOR TILE FINISHES THROUGHOUT KITCHEN AND
RESTROOM.
1 LS

Page 76 of 840 ends

C-4
8 REMOVE ALL EXISTING PARTITIONS, HARDWARE AND
MISCELLANEOUS. 1 LS
9 REMOVE ALL EXISTING KITCHEN AND RESTROOM
FIXTURES, EQUIPMENT AND MISCELLANEOUS. 1 LS
10 REMOVE ALL EXISTING RESTROOM SIGNS AND
ACCESSORIES. 1 LS
11 DEMOLISH AND PROPERLY DISPOSE DESIGNATED POSTS
AS INDICATED IN DEMOLITION PLAN. 1 LS
12 REMOVE ALL EXISTING CEILING GYPSUM BOARD,
ACOUSTIC CEILING TILE (ACT); PREPARE THE

STRUCTURE TO RECEIVE NEW CEILING SYSTEM PER
CONSTRUCTION RCP PLAN.
4500 SF
13 REMOVE ALL EXISTING HVAC REGISTERS, DIFFUSERS,

AND DUCTWORK TO ACCOMMODATE NEW HVAC
SYSTEM INSTALLATION.
1 LS
14 REMOVE ALL EXISTING EXHAUST FANS AND
ASSOCIATED COMPONENTS TO RECEIVE NEW. 1 LS
Construction Phase - First Floor
1 CONSTRUCT NEW INTERIOR WALLS AS INDICATED WITH

HATCH LINES, PER CONSTRUCTION AND STRUCTURAL
PLANS. ENSURE ALL WORK MEETS DESIGN
SPECIFICATIONS AND CODE REQUIREMENTS.
1 LS
2 FURNISH AND INSTALL ALL NEW FLOORING FINISHES
PER FINISH SCHEDULE. 4500 SF
3 PATCH AND REPAIR ALL EXISTING LOOSE AND FLAKING

INTERIOR DAMAGED WALLS, RE-PAINT TO MATCH
EXISTING, PER FINISH SCHEDULE. 2000 SF
4 FURNISH AND INSTALL ALL NEW DOORS PER DOOR
SCHEDULE AND MANUFACTURE SPECIFICATIONS. 10 EA
5 FURNISH AND INSTALL ALL NEW WINDOWS PER
WINDOW SCHEDULE AND MANUFACTURE 4 EA
6 FURNISH AND INSTALL LOCKERS PER MANUFACTURER'S
SPECIFICATION ON SHEET A4.0. 39 EA
7 FURNISH AND INSTALL FILTERED DRINKING FOUNTAIN
PER SPECIFICATION ON SHEET A4.0. 1 EA

Page 77 of 840 ends

C-5
8 FURNISH AND INSTALL ALL NEW RESTROOM
PARTITIONS, AND MISCELLANEOUS. 1 LS
9 FURNISH AND INSTALL RESTROOM AND KITCHEN WALL

AND FLOOR TILES PER INTERIOR WALL VIEWS & FINISH
SCHEDULE.
2000 SF
10 FURNISH AND INSTALL ALL NEW RESTROOM FIXTURES

AND EQUIPMENT AND MISCELLANEOUS ITEMS PER

CONSTRUCTION PLAN & EQUIPMENT SCHEDULE AND
MANUFACTURE SPECIFICATION.
1 LS
11 FURNISH AND INSTALL KITCHEN BASE AND UPPER

CABINETS AND APPLIANCES PER CONSTRUCTION PLAN
& FINISH SCHEDULE AND MANUFACTURE
SPECIFICATION.
1 LS
12 FURNISH AND INSTALL KITCHEN SERVING COUNTERTOP
PER ENLARGEMENT PLAN. 1 LS
13 FURNISH AND INSTALL PLUMBING & ELECTRICAL
FIXTURES AND MISCELLANEOUS PER M&E PLANS. 1 LS
14 FURNISH AND INSTALL INTERNATIONAL
RESTROOM SIGNS. 2 EA
15 FURNISH AND INSTALL ACCESSIBLE INTERNATIONAL

AND DIRECTIONAL SIGNS, RESTROOM AND INTERIOR
SIGNS PER SHEET A0.2.
2 EA
16 REVISE DOOR SWING TO OPEN INWARD. REPAIR ANY

WALL DAMAGE CAUSED BY MODIFICATION AND
REPAINT TO MATCH EXISTING FINISH.
1 EA
17 FURNISH AND INSTALL MIRROR PER
MANUFACTURER'S SPECIFICATIONS AS ON SHEET A4.0. 1 LS
18 FURNISH AND PLACE TWO FLOWERPOTS. 2 EA
19 CONSTRUCT NEW POST AS DESIGNATED IN
CONSTRUCTION PLAN PER STRUCTURE DRAWING. 3 EA
20 PATCH AND REPAIR EXISTING CEILING ASSEMBLY AS
REQUIRED. 4000 SF
21 INSTALL NEW GYPSUM BOARD CEILING PER

CONSTRUCTION PLAN, APPLY JOINT COMPOUND, SAND,
AND PREPARE FOR FINISHES. PAINT NEW CEILING AS
SPECIFIED.
4000 SF

Page 78 of 840 ends

C-6
22 FURNISH AND INSTALL ALL NEW LIGHTING FIXTURES,

AND OTHER CEILING ELEMENTS, PER ELECTRICAL, RCP
AND MECHANICAL DRAWINGS.
1 LS
22 INSTALL NEW HVAC REGISTERS, DIFFUSERS, AND
DUCTWORK; INSTALL NEW EXHAUST FANS WITH
ASSOCIATED WIRING; AND ENSURE PROPER

INTEGRATION AS PER MECHANICAL, ELECTRICAL, AND
CONSTRUCTION PLANS.
1 LS
23 INSTALL NEW 2' x 2' ACOUSTICAL TILE AND GRID

CEILING PER CONSTRUCTION PLAN, APPLY JOINT
COMPOUND, SAND, PREPARE FOR FINISHES. PAINT NEW
CEILING AS SPECIFIED.
1 LS
Demo Phase - Second Floor
1 DEMOLISH EXISTING FLOORING FINISH AND MORTAR
BED DOWN TO THE CONCRETE SLAB. SAW CUT AND

REMOVE PORTIONS OF THE EXISTING SLAB AS
REQUIRED FOR INSTALLATION OF NEW FLOOR DRAINS.
400 SF
2 DEMOLISH AND PROPERLY DISPOSE WET AND DRY
WALLS AS INDICATED WITH DASHED LINES. 1 LS
3 REMOVE ALL EXISTING REMAINING RESTROOM WALL
AND FLOOR TILE THROUGHOUT THE RESTROOM. 1 LS
4 REMOVE ALL EXISTING TOILET DOORS INDICATED WITH
DASHED LINES. 1 LS
5 REMOVE ALL EXISTING PARTITIONS, HARDWARE, AND
MISCELLANEOUS. 1 LS
6 REMOVE ALL EXISTING PLUMBING FIXTURES AND
MISCELLANEOUS PER PLUMBING DRAWINGS. 1 LS
7 REMOVE ALL EXISTING LIGHTING FIXTURES, WRINGING
AND MISCELLANEOUS PER ELECTRICAL PLANS. 1 LS
8 REMOVE ALL EXISTING RESTROOM TACTILE SIGNS AND
ACCESSORIES. 1 LS
9 REMOVE ALL EXISTING CEILING GYPSUM BOARD;

PREPARE THE STRUCTURE TO RECEIVE NEW CEILING
SYSTEM PER CONSTRUCTION RCP PLAN.
1 LS

Page 79 of 840 ends

C-7
10 REMOVE ALL EXISTING HVAC REGISTERS, DIFFUSERS,

AND DUCTWORK TO ACCOMMODATE NEW HVAC
SYSTEM INSTALLATION.
1 LS
11 REMOVE ALL EXISTING EXHAUST FANS AND
ASSOCIATED COMPONENTS TO RECEIVE NEW. 1 LS
12 DEMOLISH EXISTING SUPPLY AIR DIFFUSER. CONTRACTOR

SHALL REPLACE ANY EXISTING FLEX DUCT UNSUITABLE
FOR REUSE AND NOTIFY THE ENGINEER OF ANY INTENT.
2 EA
13 DEMOLISH EXISTING CEILING EXHAUST FAN.

CONTRACTOR SHALL REPLACE ANY EXISTING FLEX DUCT

UNSUITABLE FOR REUSE AND NOTIFY THE ENGINEER OF
ANY INTENT.
2 EA
Construction Phase - Second Floor
1 CONSTRUCT NEW INTERIOR WALLS AS INDICATED WITH

HATCH LINES, PER CONSTRUCTION AND STRUCTURAL
PLANS. ENSURE ALL WORK MEETS DESIGN
SPECIFICATIONS AND CODE REQUIREMENTS.
1 LS
2 FURNISH AND INSTALL ALL NEW FLOORING FINISHES
PER FINISH SCHEDULE. 400 SF
3 FURNISH AND INSTALL WALL TILES THROUGHOUT BOTH

RESTROOMS PER INTERIOR WALL VIEWS & FINISH
SCHEDULE.
1 LS
4 RELOCATE AND CONCEAL DESIGNATED VENT PIPING
WITHIN ADJACENT WALL PER PLUMBING PLANS. 1 LS
5 FURNISH AND INSTALL ALL NEW DOORS PER DOOR
SCHEDULE AND MANUFACTURE SPECIFICATIONS. 2 EA
6 FURNISH AND INSTALL ALL NEW RESTROOM

PARTITIONS, DOORS, AND MISCELLANEOUS PER

CONSTRUCTION PLANS AND MANUFACTURE
SPECIFICATIONS.
1 LS
7 FURNISH AND INSTALL ALL NEW RESTROOM

EQUIPMENT AND MISCELLANEOUS ITEMS PER

CONSTRUCTION PLANS & EQUIPMENT SCHEDULE AND
MANUFACTURE SPECIFICATION.
1 LS

Page 80 of 840 ends

C-8
8 FURNISH AND INSTALL ALL PIPING AND PLUMBING
SYSTEMS PER PLUMBING PLANS. 1 LS
9 FURNISH AND INSTALL ALL WIRING AND ELECTRICAL
SYSTEM PER ELECTRICAL PLANS. 1 LS
10 FURNISH AND INSTALL ALL DUCTS AND MECHANICAL
SYSTEM PER MECHANICAL PLANS. 1 LS
11 FURNISH AND INSTALL ALL PLUMBING FIXTURES AND
MISCELLANEOUS PER FIXTURE SCHEDULE 1 LS
12 FURNISH AND INSTALL ALL ELECTRICAL FIXTURES AND
MISCELLANEOUS PER ELECTRICAL PLANS. 1 LS
13 FURNISH AND INSTALL INTERNATIONAL TACTILE
RESTROOM SIGNS. 2 EA
14 FURNISH AND INSTALL INTERNATIONAL TACTILE
RESTROOM SIGNS. 2 EA
15 PATCH AND REPAIR CEILING SUBSTRATE. PREPARE TO
RECEIVE NEW CEILING. FURNISH AND INSTALL NEW

GYPSUM BOARD CEILING PER RCP PLAN AND STANDARD
BUILDING CODE.
1 LS
Total Base Bid Schedule (In Figures)
TOTAL AMOUNT BID IN WORDS _____________________________________________ _______________________________________________________________________Dollars Bidder’s Signature Title
______________________________________________________________________________ Company Name

IN CASE OF DISCREPANCY BETWEEN THE WORDS AND FIGURES, THE WORDS SHALL PREVAIL.

RECEIPT OF ADDENDUM NO(S). __, __, __, IS/ARE HEREBY ACKNOWLEDGED.

Page 81 of 840 ends

C-9
Before signing the contract, the lowest responsible bidder shall furnish all necessary bonds within ten (10) days after receiving the Contract notification. This bid is based upon completing the work in seventy-five (75) working days from the date of the Notice to Proceed.

After opening bids, the City will contact the lowest responsive/responsible bidder and inform him/her to submit signed contract, and required bonds and insurances to the City within ten (10) calendar days. These signed documents will be included in the City Council report to award the contract at the City Council Meeting to the lowest monetary bidder who will be determined by the Total Lump Sum Bid amount indicated above. Upon approval of the contract by City Council, the City will issue the “Notice to Proceed with Construction”. _____________________________________________________________________ Enclosed is a Bidder's Bond, Certified Check or Cashier's Check number ________ on the ____________________________ Bank, which is not less than ten percent (10%), as a guarantee that the undersigned will enter into the Contract if awarded to the undersigned. The undersigned further agrees that in case of default in executing the required contract with necessary bonds and insurance, within the time limits above specified, said bond or check and the money payable therein shall be forfeited to and become the property of the City of Montebello, State of California.

SIGNATURE OF BIDDER _______________________ TEL NO. (____)____________ BUSINESS ADDRESS ________________________________________________ ----------------------------------------------------------------------------------------------------------------

CONTRACTOR'S LICENSE
NUMBER & EXPIRATION DATE ___________________________________________ TYPE OF LICENSE ___________________________________________ I declare under penalty of perjury that the foregoing is true and correct. ______________________________, Dated this ___ day of _ _________, 20__.

CONTRACTOR'S SIGNATURE
------------------------------------------------------------------------------------------------------------------- SURETY COMPANY'S ___________________________________________ NAME
___________________________________________

ADDRESS
___________________________________________

CITY STATE / ZIP CODE
(_____) _________________ _(____)_____________

PHONE FAX

Page 82 of 840 ends

C-10

DESIGNATION OF SUBCONTRACTORS
California Public Contract Code 6109
The City of Montebello cannot permit a contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project.

In compliance with the Subletting and Subcontracting Fair Practices Act (Chapter 2, commencing at Section 4100, Division 5, Title 1 of the California Public Contract Code) and any amendments thereof, each bidder shall set forth below: (a) the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement to be performed under this contract in an amount in excess of one-half of one percent of the prime contractor's total bid, and (b) the portion of the work which will be done by each subcontractor under this act. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in this bid.

If a prime contractor fails to specify a subcontractor or if a prime contractor specifies more than one subcontractor for the same portion of work to be performed under the contract in excess of one-half of one percent of the prime contractor's total bid, the prime contractor shall be deemed to have agreed that he/she is fully qualified and will perform that portion themselves.

No prime contractor whose bid is accepted shall (a) substitute any subcontractor, (b) permit any subcontract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the original bid, or (c) subcontract any portion of the work in excess of one-half of one percent of the prime contractor's total bid as to which his/her original bid did not designate a subcontractor, except as authorized in the Subletting and Subcontracting Fair Practices Act. Subletting or subcontracting of any portion of the work in excess of one-half of one percent of the prime contractor's total bid as to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the authority awarding this contract setting forth the facts constituting the emergency or necessity.

California Public Contract Code 7104
Contractor shall, in any activity involving trenching more than four feet deep, notify the Engineer of hazardous materials, subsurface or latent physical site conditions different from those indicated and any unusual site conditions. Contractor shall, in contracts exceeding $25,000, provide detailed plans for trenches or excavations of five feet or more in depth. Cal. Lab. Code § 6705.

Page 83 of 840 ends

C-11
Bidder’s List of Subcontractors
As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts shall be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at:
https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000 (whichever is greater). Photocopy this form for additional firms.

Subcontractor Name and Location
Line Item # &
Description
Subcontract
Amount
Percentage of Bid Item
Subcontracted
Contractor License
Number
DIR Reg Number
Name:
_______________________________________
City, State
Name:
_______________________________________
City, State
Name:
_______________________________________
City, State
Name:
_______________________________________
City, State
Name:
_______________________________________
City, State

Page 84 of 840 ends

C-12

REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two years:

1. __________________________________________________________________________ Name and Address of Agency
__________________________________________________________________________ Name and telephone number of person familiar with project __________________________________________________________________________ Contract amount Type of work Date completed

2. __________________________________________________________________________ Name and Address of Agency
__________________________________________________________________________ Name and telephone number of person familiar with project __________________________________________________________________________ Contract amount Type of work Date completed

3. __________________________________________________________________________ Name and Address of Agency
_________________________________________________________________________ Name and telephone number of person familiar with project _________________________________________________________________________ Contract amount Type of work Date completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________

Page 85 of 840 ends

C-13
(THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS PROPOSAL SHALL ALSO

CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF

THIS PROPOSAL)

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder_________________________________________________________________, proposed subcontractor _______________________________________________, hereby certifies that he has ___ , has not , participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.

Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.

Page 86 of 840 ends

C-14

PUBLIC CONTRACT CODE
Public Contract Code Section 10285.1 Statement
In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares
under penalty of perjury under the laws of the State of California that the bidder has ___ , has not ___ been convicted
within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.

Note: The bidder must place a checkmark after "has" or "has not" in one of the blank spaces provided.

The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

Public Contract Code Section 10162 Questionnaire
In conformance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:

Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes _____ No _____
If the answer is yes, explain the circumstances in the following space.

Page 87 of 840 ends

C-15
Public Contract Code 10232 Statement
In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.

Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

Page 88 of 840 ends

C-16
Non-collusion Affidavit
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY / COUNTY of _________________________________________ DEPARTMENT OF PUBLIC WORKS.

In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

Note: The above Noncollusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Noncollusion Affidavit.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

Page 89 of 840 ends

C-17

NON-COLLUSION AFFIDAVIT
The undersigned is submitting a bid for performing the following work by contract, being duly sworn, deposes and says:

That he/she has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
______________________________
______________________________
______________________________
______________________________
(Fill in description of contract)
______________________________
Company
______________________________
Name of Bidder
______________________________
Signature of Bidder
______________________________
Business Address
______________________________
City StateZip Code
Subscribed and sworn to before me this _____day of ___________________, 20__ __. ______________________________
Notary Public in and for the County of
______________________________, State of California.

My Commission Expires ___________________, 20__ __.

Page 90 of 840 ends

C-18

DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

Notes: Providing false information may result in criminal prosecution or administrative sanctions.

The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.

Page 91 of 840 ends

C-19

NONLOBBYING CERTIFICATION

FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(l) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.

Page 92 of 840 ends

C-20

DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year _____ quarter _________
f. loan insurance date of last report __________

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Prime Subawardee
Tier_______ , if known
Congressional District, if known Congressional District, if known

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable ___________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. a. Name and Address of Lobby Entity b. Individuals Performing Services (including (If individual, last name, first name, MI) address if different from No. 10a) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)

11. Amount of Payment (check all that apply) 13. Type of Payment (check all that apply) $_____________ actual planned a. retainer
b. one-time fee

12. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature______________ e deferred
value _____________ f. other, specify _________________________

14. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) if necessary)

15. Continuation Sheet(s) attached: Yes No

16. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required
pursuant to 31 U.S.C. 1352. This information will be
reported to Congress semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature:________________________________________
Print Name: ______________________________________
Title:____________________________________________
Telephone No.:_____________________ Date: __________
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL

Page 93 of 840 ends

C-21

INSTRUCTIONS FOR COMPLETION OF SF-LLL,

DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether sub-awardee or prime Federal recipient, at the initiation or receipt of covered Federal action or a material change to previous filing pursuant to title 31 U.S.C. section 1352. The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress or an employee of a Member of Congress in connection with a covered Federal action.

Attach a continuation sheet for additional information if the space on the form is inadequate.

Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.

1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence, the outcome of a covered Federal action.

2. Identify the status of the covered Federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered Federal action.

4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District if known. Check the appropriate classification of the reporting entity that designates if it is or expects to be a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.

5. If the organization filing the report in Item 4 checks "Subawardee" then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.

6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.

8. Enter the most appropriate Federal identifying number available for the Federal action identification in item 1 (e.g., Request for Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."

9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.

10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influenced the covered Federal action. (b) Enter the full names of the individual(s) performing services and include full address if different from 10 (a). Enter Last Name, First Name and Middle Initial (Ml).

11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

Page 94 of 840 ends

C-22

12. Check the appropriate box. Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

13. Check the appropriate box. Check all boxes that apply. If other, specify nature.

14. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with Federal officials.

Identify the Federal officer(s) or employee(s) contacted or the officer(s) employee(s) or Member(s) of Congress that were contacted.

15. Check whether or not a continuation sheet(s) is attached.

16. The certifying official shall sign and date the form, print his/her name title and telephone number.

Public reporting burden for this collection of information is estimated to average 30 minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503. SF-LLL-Instructions Rev. 06-04-90«ENDIF»

Page 95 of 840 ends

C-23
Note: The standard printed bid bond form of any bonding company acceptable to the City of Montebello may be used in lieu of the following approved sample bond form, provided the security stipulations protecting the City of Montebello are not in any way reduced by use of the surety company’s printed standard form.

PROPOSAL GUARANTEE

BID BOND
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
KNOW ALL MEN BY THESE PRESENTS that ______________________________________ ______________________________________________, as BIDDER, and ________________ ______________________________________________, as SURETY, are held and firmly bound unto the City of Montebello, as AGENCY, in the penal sum of _____________________ ______________________________________________________________________________ ____________________________ dollars ($_________________), which is ten percent of the total amount bid by BIDDER to AGENCY for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly be these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals, this _______ day of ______________, 20____.

BIDDER* _____________________________________________________________________ ______________________________________________________________________________ SURETY*_____________________________________________________________________ Subscribed and sworn to this _______ day of __________________, 20____.

NOTARY PUBLIC _____________________________________________________________ *Provide BIDDER/SURETY name, address and telephone number and the name, title, address and telephone number of authorized representative.

Page 96 of 840 ends

C-24
BIDDER’S VIOLATION OF LAW/SAFETY QUESTIONNAIRE
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
In accordance with Government Code Section 14310.5, the BIDDER shall complete, under penalty of perjury, the following questionnaire.

QUESTIONNAIRE
Has the Bidder, any officer of the bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation?
Yes_________ No_________
If the answer is yes, explain the circumstances in the space provided.

Page 97 of 840 ends

C-25
Note: The following is to be used in case cash, a cashier’s check or a certified check accompanies the proposal.

PROPOSAL GUARANTEE
CASH, CASHIER’S CHECK, OR CERTIFIED CHECK
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
Accompanying this proposal is a certified check, a cashier’s check, or bidder’s bond payable to the order of the City of Montebello, or cash in the amount of _____________________________ _____________________________________________________________________________ _______________________________________________________________________ Dollars ($_____________________). The proceeds of the same shall become the property of said City if, in case this proposal shall be accepted by said City through the City Council, the undersigned shall fail to execute a contract, with and furnish the insurance and bonds required by the City of Montebello within the specified time; otherwise, the same is to be returned to the undersigned as set forth in the Instructions to Bidders.
__________________________________
__________________________________
Bidder

Page 98 of 840 ends

C-26

DESIGNATION OF SUBCONTRACTORS
BIDDER proposes to subcontract certain portions of the work, which are in excess of one-half of one percent of the bid, and to procure materials and equipment from suppliers and vendors as follows:

NAME, ADDRESS, LICENSE NO.,

AND PHONE NUMBER OF

SUBCONTRACTORS, SUPPLIERS, PORTION OF WORK,

AND VENDORS MATERIALS, OR EQUIPMENT
____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ Prior to award of contract, Contractor shall submit a list of suppliers and vendors, in writing, to the City Engineer.

Page 99 of 840 ends

C-27

REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two years:

1. __________________________________________________________________________ Name and Address of Agency
__________________________________________________________________________ Name and telephone number of person familiar with project __________________________________________________________________________ Contract amount Type of work Date completed

2. __________________________________________________________________________ Name and Address of Agency
__________________________________________________________________________ Name and telephone number of person familiar with project __________________________________________________________________________ Contract amount Type of work Date completed

3. __________________________________________________________________________ Name and Address of Agency
_________________________________________________________________________ Name and telephone number of person familiar with project _________________________________________________________________________ Contract amount Type of work Date completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________

Page 100 of 840 ends

C-28

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
BIDDER certifies that in all previous contracts or subcontractors, all reports which may have been due under the requirements of any AGENCY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

AFFIRMATIVE ACTION CERTIFICATION
BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded thereunder.

Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.

NON-COLLUSION AFFIDAVIT
BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud.

Page 101 of 840 ends

C-29
BIDDER’S INFORMATION
BIDDER certifies that the following information is true and correct:

Bidder’s Name ___________________________________________________________ Business Address: __________________________________________________________

___________________________________________________________ Telephone ___________________________________________________________ State Contractor’s License No. and Class: ________________________________________ Original Date Issued ____________________ Expiration Date ______________________ The following are the names, titles, email addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest in this proposal:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ All current and prior DBA’s, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________

Page 102 of 840 ends

C-30
IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, title, hands, and seals of all forenamed principals this ___________ day of _____________, 20___.

BIDDER______________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ The undersigned declares under penalty of perjury under the laws of the State of California that the representations made hereto are true and correct.
____________________________________
Signature of Contractor’s Representative
____________________________________
Printed Name
____________________________________
Title
Subscribed and sworn to this _________ day of _____________________,20_______.

NOTARY PUBLIC _____________________________________________________

Page 103 of 840 ends

D-1

CITY OF MONTEBELLO

STANDARD PUBLIC WORKS AGREEMENT
THIS STANDARD PUBLIC WORKS AGREEMENT (“AGREEMENT”) is dated ________________________ for reference purposes only and is made and entered into by and between the CITY OF MONTEBELLO, a Municipal corporation (the “CITY”) and _____________________(“CONTRACTOR”) whose address is
__________________________________________________.

SEC. 1. RECITALS
WHEREAS, the CITY duly advertised a Notice Inviting Bids to be submitted on or before ________________________________ on ______________________________________. for the work of _________________________(describe work), (“PROJECT”).

WHEREAS, on ___________________________, the City Council accepted the bid of CONTRACTOR as the lowest responsible, responsive bid received and directed that a written contract be entered into with CONTRACTOR for the PROJECT.

NOW, THEREFORE, in consideration of the promises and the mutual covenants and agreements herein contained, the parties do hereby agree as follows:

SEC. 2. CONTRACT DOCUMENTS.

A. The CONTRACT DOCUMENTS for the PROJECT shall consist of the Notice Inviting Sealed Bids, the Instructions to Bidders, Bidders Proposal, Addendums, General Specifications and all referenced specifications, details, standard drawings, and appendices, together with this Contract and all required bonds, and insurance certificates. All of the “Contract Documents” are intended to complement the other documents so that any work called for in one, and not mentioned in the others, or vice versa, is to be executed the same as if mentioned in all of said documents. The CONTRACT DOCUMENTS are incorporated herein by this reference and made part hereof as though they were fully set forth herein.

B. In case any of the CONTRACT DOCUMENTS conflict with each other, the order of preference for the CONTRACT DOCUMENTS is:

1. This AGREEMENT

2. Appendices

3. Standard drawings

4. Details

5. Special Provisions, if any

6. Addendums

7. General Specifications and all referenced specifications

Page 104 of 840 ends

D-2

8. Bidders Proposal

9. Instructions to Bidders

10. Notice Inviting Sealed Bids
SEC. 3. THE WORK.

For and in consideration of the payments and agreements to be made and performed by CITY, CONTRACTOR agrees to furnish all materials and perform all work required for the PROJECT and to fulfill all other obligations as set forth in the CONTRACT DOCUMENTS.

SEC. 4. COMPENSATION.

CONTRACTOR hereby agrees to receive and accept the total amount of ________________________________________, which is based on performing all of the work shown on Bidders Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the CONTRACT DOCUMENTS, and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work. CITY shall herein retain five percent (5%) of said price until said time as the provisions of SEC. 18 herein have been met.

Sec. 4.1. Progress Payments
Progress Payments shall be made in accordance with section ________ of the General Provisions and the provisions of this Section 4.1. Upon receipt of a properly presented payment request, the CITY shall process the payment request in accordance with Public Contracts Code Section 20104.5. The CITY shall review the payment request as soon as possible. If the CITY rejects the payment request, it shall be returned to the CONTRACTOR within seven days of its receipt by the CITY with an explanation for the reasons of its rejection. If the payment request is approved in writing by the CITY, payment shall be made in thirty (30) days of receipt of an undisputed and properly presented payment request. Late payments shall bear interest at the legal rate of interest in accordance with Code of Civil Procedure 685.010. CITY shall pay CONTRACTOR a sum based upon ninety five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the period covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security. Refer to Section 4.2 of this Agreement for retention of funds.

Sec. 4.2. Retention of Funds
Progress payments shall be made in accordance with the provisions of Section 4.1 of this Agreement. In accordance with said section, CITY shall pay CONTRACTOR a sum based upon ninety five percent (95%) of the contract price in proportion to the labor and materials incorporated into the work under the contract during the month covered by said statement. The remaining five percent (5%)

Page 105 of 840 ends

D-3
thereof shall be retained as performance security to be paid to the CONTRACTOR within sixty (60) days after final acceptance of the work by the City Council, after CONTRACTOR shall have furnished CITY with a release of all undisputed contract amounts, if required by CITY. In the event there are any claims specifically excluded by CONTRACTOR from the operation of the release, the CITY may retain proceeds (per Public Contract Code 7107) of up to 150% of the amount in dispute. CITY’s failure to deduct or withhold shall not affect CONTRACTOR’s obligations hereunder.

Sec. 4.3. Substitution of Securities.

Pursuant to Public Contracts Code Sec. 22300 CONTRACTOR shall be allowed to substitute securities for any moneys withheld by the CITY to ensure performance under a contract, unless, federal regulations or policies, or both, do not allow the substitution of securities. At the request and expense of the CONTRACTOR, securities equivalent to the amount withheld shall be deposited with the CITY, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to the CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to the contractor.

SEC. 5. UNDOCUMENTED WORKERS.

CONTRACTOR hereby promises and agrees to comply with all of the provisions of Federal and/or State law as the same shall apply to this PROJECT pertaining to the employment of unauthorized aliens as defined therein. Should CONTRACTOR so employ unauthorized aliens for the performance of work and/or services covered by this Contract, and should the Federal Government impose sanctions against the CITY for use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, hold harmless, indemnify and defend CITY for the cost of all such sanctions imposed, together with any and all costs, including attorneys’ fees, incurred by the CITY in connection therewith.

SEC. 6. NOTICE TO PROCEED.

CONTRACTOR shall commence work on the date specified in the Notice to Proceed to be issued in writing to CONTRACTOR by the CITY and shall complete work on the PROJECT within SeventyFive (75) Working Days from the commencement thereof.

SEC. 7. DISCOVERY OF HAZARDOUS OR LATENT CONDITIONS.

A. CONTRACTOR shall, without disturbing the condition, notify CITY in writing as soon as CONTRACTOR, or any subcontractor, agent or employees have knowledge and reporting is possible, of the discovery of any of the following conditions:

1. The presence of any material that the CONTRACTOR believes is hazardous waste, as defined in Section 25117 of the Health and Safety Code;

2. Subsurface or latent physical conditions at the site differing from those indicated in the specifications; or,

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Contract.

Page 106 of 840 ends

D-4
B. Pending a determination by the CITY of appropriate action to be taken, CONTRACTOR shall provide security measures (e.g., fences) adequate to prevent the hazardous waste or physical conditions from causing bodily injury to any person.

C. CITY shall promptly investigate the reported conditions. If CITY, through the City Engineer or his/her designee, and in the exercise of its sole discretion, determines that the conditions do materially differ, or do involve hazardous waste, and will cause a decrease or increase in the CONTRACTOR’s cost of or time required for performance of any part of the work, then CITY shall issue a change order.

D. In the event of a dispute between CITY and CONTRACTOR as to whether the conditions materially differ or involve hazardous waste or cause a decrease or increase in the CONTRACTOR’s cost of, or time required for performance of any part of the work, CONTRACTOR shall not be excused from any schedule completion date, and shall proceed with all work to be performed under the Contract. CONTRACTOR shall retain any and all rights which pertain to the resolution of disputes and protests between the parties.

SEC. 8. MISCELLANEOUS STATUTORY REQUIREMENTS
Sec. 8.1. Contractor License.

CONTRACTOR shall possess a california contractor’s license type “A” for the performance of the Project.

Sec. 8.2. Ineligible Contractor Prohibited.

Any contractor or subcontractor who is ineligible to perform work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code is prohibited from performing work under this Agreement.

Sec. 8.3. Compliance with SB 854 Registration.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No prime contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The CONTRACTOR will be required to post job site notices as described in 8 California Code of Regulation section 16451(d).

Sec. 8.4. Trench and Pipeline Safety.

If this Contract is for more than $25,000 and involves excavation of any trench five feet or more in depth, the CONTRACTOR shall submit a detailed plan of shoring, bracing, sloping or other provisions to be made for worker protection in accordance with Labor Code Section 6705. Such plan shall be approved by a qualified representative of the CITY.

Sec. 8.5. Utility Relocation.

CITY is responsible for removal, relocation, or protection of existing main or trunkline utilities to the extent such utilities were not identified in the invitation for bids or specifications. CITY shall

Page 107 of 840 ends

D-5
reimburse contractor for any costs incurred in locating, repairing damage not caused by contractor and removing or relocating such unidentified utility facilities, including equipment idled during such work.

CONTRACTOR shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities.

Sec. 8.6. Third Party Claims Notification.

The CITY shall timely notify the CONTRACTOR in writing of any third party claims relating to the Agreement.

Sec. 8.7. Unfair Business Practices Claims.

The CONTRACTOR or subcontractor offers and agrees to assign to the CITY all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the CITY renders final payment to the CONTRACTOR without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.).

Sec. 8.8. Day’s Work.

CONTRACTOR acknowledges that under California Labor Code sections 1810 and following, 8 hours of labor constitutes a legal day’s work. CONTRACTOR will forfeit as a penalty to CITY the sum of $25.00 for each worker employed in the execution of this Contract by CONTRACTOR or any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. (Labor Code § 1813).

Sec. 8.9. Payroll Records.

CONTRACTOR shall maintain the certified payroll records required by Labor Codes Sec. 1776 and shall report such records directly to the California Labor Commissioner as required by Labor Code Sec. 1771.4. The CONTRACTOR shall inform the CITY of the location of the records enumerated under Labor Code Sec. 1776, including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.

Sec. 8.10. Employment of Apprentices.

Nothing in this Contract prevents CONTRACTOR or any subcontractor from employing properly registered apprentices in the execution of the Contract. CONTRACTOR is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under §1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations.

Page 108 of 840 ends

D-6
Sec. 8.11. Records Audit
In accordance with Government Code, Section 8546.7, records of both the CITY and the CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.

SEC. 9. PREVAILING WAGES
A. CONTRACTOR shall pay prevailing Wage rates for this Project in accordance with the “General Wage Determination Made by the Director of Industrial Relations Pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1", for Los Angeles County.

Wage rates shall conform with those posted at __________________ and the Project site.

B. The following Labor Code sections are hereby referenced and made a part of this Agreement:

1. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates.

2. Section 1777.4 - Apprenticeship Requirements.

3. Section 1777.5 - Apprenticeship Requirements.

4. Section 1813 - Penalty for Failure to Pay Overtime.

5. Sections 1810 and 1811 - Working Hour Restrictions.

6. Section 1775 - Payroll Records.

7. Section 1773.8 - Travel and Subsistence Pay.

SEC. 10. INDEMNITY, DEFENSE AND HOLD HARMLESS
A. CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

B. CONTRACTOR obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights

Page 109 of 840 ends

D-7
of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY’S active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.

SEC. 11. BONDS.

A. CONTRACTOR, before commencing said PROJECT, shall furnish and file with CITY, a Performance Bond, or bonds in the sum of one hundred percent (100%) of the Agreement price thereof conditioned upon the faithful performance of this Agreement in the form attached hereto as Exhibit “B.”.

B. CONTRACTOR, before commencing said PROJECT, shall furnish and file with CITY, a Payment Bond in the sum of 100% of the Agreement price, conditioned upon the payment of all labor and materials furnished in connection with this Agreement in the form attached hereto as Exhibit “C.” C. CONTRACTOR, before commencing said PROJECT, shall furnish and file with CITY, a Warranty Bond in the amount of 50% of the Contract price, conditioned upon the guaranty and warranty of the work and labor and materials in connection with the work performed on the Project pursuant to this Agreement in the form attached hereto as Exhibit “D.” SEC. 12. INSURANCE REQUIREMENTS.

Prior to commencing work hereunder, CONRACTOR shall provide the CITY with proof of insurance naming the CITY and each of its directors, officers, agents, and employees as additional-named insureds on a policy or policies of insurance providing and maintaining the coverages set forth in the Insurance Schedule attached hereto as Exhibit A. CITY shall have the right to hold the policies and policy renewals, and CONTRACTOR shall promptly furnish to CITY all renewal notices and all receipts of paid premiums. CITY may make proof of loss if not made promptly by CONTRACTOR.

SEC. 13. LIQUIDATED DAMAGES.

See Section 6-9 Liquidated Damages of the General Provisions. In addition, pursuant to the authority of California Public Contracts Code Section 7102, CITY and CONTRACTOR agree that the determination of actual damages for any unreasonable delay in performance of this Agreement caused by CITY would be extremely difficult or impractical to determine in the event of a breach of this Agreement by CITY. Therefore, if the CITY is determined to be liable for such unreasonable delays, the CITY and its sureties shall be liable to the CONTRACTOR for the sum of five hundred dollars ($500.00) as liquidated damages for each working day of delay in the performance of any service required hereunder

Page 110 of 840 ends

D-8
SEC. 14. DISPUTE RESOLUTION
Sec. 14.1. Claims of $375,000 or Less
A. A claim by the CONTRACTOR for a time extension, for money damages for work, or a payment disputed by the CITY must be submitted to a resolution process in accordance with Public Contracts Code Sections 21040-21040.4. A summary of Sections 21040-21040.4 are as follows:
(1) Informal negotiation between the CITY and CONTRACTOR. (2) Mediation with the CONTRACTOR.
(3) Court mandated Arbitration.
(4) Court trial. If the party requesting the court trial does not prevail, then that party must pay all court costs and attorney's fees.

Sec. 14.2 Public Contracts Code 9204 Claims
CONTRACTOR shall comply with the procedure set forth in Public Contracts Code section 9204 for any claim, as that term is defined therein, for one or more of the following: 1) a time extension, including, without limitation, for relief from damages or penalties for delay, 2) payment of money or damages arising from work done pursuant to this Agreement, and/or 3) payment of an amount disputed by the CITY under this Agreement. A summary of the provisions of Public Contracts Code Section 9204 is as follows:

1. CONTRACTOR must send a claim to the CITY for a time extension, payment for work not in the Agreement, or payments disputed by the CITY by registered mail or certified mail with return receipt requested.

2. CITY must respond within 45 days as to which claims are disputed and undisputed.

3. If claim remains in dispute, CONTRACTOR may request informal meet and confer meeting with CITY.

4. After meet and confer, an disputed claim remaining shall be submitted to non-binding mediation.

5. All undisputed claims shall be paid within 60 days.

SEC. 15. TERMINATION.

Sec. 15.1. Termination for Convenience.

The CITY may terminate this contract, in whole or in part, with 30 days written notice to the CONTRACTOR when it is in the CITY’s best interest. The CONTRACTOR shall be paid its costs, including contract close-out costs, and profit on work performed up to the time of termination. The CONTRACTOR shall promptly submit its termination claim to CITY to be paid the CONTRACTOR. If the CONTRACTOR has any property in its possession belonging to the CITY, the CONTRACTOR will account for the same, and dispose of it in the manner the CITY directs. The CONTRACTOR may terminate this contract, in whole, with 90 days written notice to the CITY.

Page 111 of 840 ends

D-9
Sec. 15.2 Termination for Default.

If at any time the CONTRACTOR is determined to be in material breach of the Contract, a Notice of Potential Breach of Contract shall be prepared by the CITY, and will be served upon the CONTRACTOR and its sureties. If the CONTRACTOR continues to neglect or refuses to comply with the Contract or with the Notice of Potential Breach of Contract to the satisfaction of the CITY within the time specified in such Notice, the CITY shall have the authority to terminate the Contract for this Project.

Sec. 15.3 Waiver of Remedies for any Breach.

In the event that CITY elects to waive its remedies for any breach by CONTRACTOR of any covenant, term or condition of this Contract, such waiver by CITY shall not limit CITY’s remedies for any succeeding breach of that or of any other term, covenant, or condition of the Contract.

SEC. 16. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties, provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.

SEC. 17. COMPLIANCE WITH APPLICABLE LAWS.

CONTRACTOR hereby promises and agrees to comply with all of the provisions of all applicable state and federal laws in connection with the performance of its obligations under this Contract.

SEC. 18. NOTICE OF COMPLETION.

Upon completion of the PROJECT and acceptance of same by the City Council, the CITY Administrator shall have cause to be recorded a Notice of Completion with the office of the Los Angeles County Recorder; and, after thirty-five (35) days from the date said Notice of Completion is recorded, the Director of Finance of CITY shall release the funds retained pursuant to SEC. 4 hereof; provided there have been no mechanics’ liens or stop notices filed against said work which have not been paid, withdrawn or eliminated as liens against said work.

Page 112 of 840 ends

D-10
SEC. 19. AUTHORITY.

Any person executing this Contract on behalf of the CONTRACTOR warrants and represents that he or she has the authority to execute this Contract on behalf of the CONTRACTOR and has the authority to bind the CONTRACTOR to the performance of its obligations hereunder.

SEC. 20. ENTIRE CONTRACT.

This Contract, including the Contract Documents and any other documents incorporated herein by specific reference, represents the entire and integrated Contract between the CITY and the CONTRACTOR. This Contract supersedes all prior oral or written negotiations, representations or agreements. This Contract may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties that expressly refers to this Contract.

SEC. 21. ATTORNEY’S FEES AND COSTS.

If either party to this Contract is required to initiate or defend or made a party to any action or proceeding in any way connected with this Contract, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

SEC. 22. INDEPENDENT CONTRACTOR.

The CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent contractor.

Neither the CITY, nor any of its officers, employees or agents shall have control over the conduct of the CONTRACTOR or any of the CONTRACTORs’ officers, employees or agents, except as herein set forth. The CONTRACTOR shall not at any time or in any manner represent that it or any of its officers, employees or agents are in any manner officers, employees or agents of the CITY, nor shall CITY officers, employees or agents be deemed the officers, employees, or agents of CONTRACTOR as a result of this Contract.

SEC. 23. NOTICE.

Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and shall be deemed to be given when served personally or deposited in the U.S. Mail, prepaid, first-class mail, return receipt requested, addressed as follows:

To CITY: City of Montebello
Attention: Director of Public Works
To CONTRACTOR: ____________________________
____________________________
____________________________
____________________________

Page 113 of 840 ends

D-11
SEC. 24. PROHIBITION AGAINST ASSIGNMENT.

The experience, knowledge, capability and reputation of CONTRACTOR, its principals and employees were a substantial inducement for the CITY to enter into this Contract. Neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of CITY. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty-five percent (25%) of the present ownership and/or control of CONTRACTOR, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Contract shall be void. No approved transfer shall release the CONTRACTOR or any surety of CONTRACTOR of any liability hereunder without the express consent of CITY.

SEC. 25. CUMULATIVE REMEDIES.

The provisions of this Contract are cumulative and in addition to and not in limitation of any rights or remedies available to CITY.

SEC. 26. COUNTERPARTS.

This Contract may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes.

IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed on the date next to their respective officers duly authorized signatures in that behalf.

CITY OF MONTEBELLO
By: ___________________________________
Mayor
Date: _________________________________
ATTEST:
______________________________________
City Clerk

APPROVED AS TO FORM
_______________________________________
City Attorney

CONTRACTOR
By: ___________________________________
Date:
__________________________________
By: ___________________________________
Date:
__________________________________

Page 114 of 840 ends

D-12
EXHIBIT “A”

INSURANCE REQUIREMENTS
On or before beginning any of the work called for by any term of this Contract, CONTRACTOR, at its own cost and expense, shall carry, maintain for the duration of this Contract, and provide proof thereof that is acceptable to CITY of its procurement of the insurance specified below from insurers and under forms of insurance satisfactory in all respects to CITY. Such insurance shall not be in derogation of CONTRACTOR’s obligations to provide indemnity under this Contract.

1. Comprehensive General Liability and Automobile Liability Insurance Coverage.

CONTRACTOR shall carry and maintain Comprehensive General Liability and Automobile Liability Insurance which provides the following:

Minimum coverage: Bodily injury limits of $2,000,000 for each person and $2,000,000 for each occurrence; property damage limits of $2,000,000 for each occurrence, $5,000,000 aggregate.

Products/Completed Operations Hazard Insurance in an amount of not less than FIVE MILLION DOLLARS ($5,000,000);
A combined single limit policy with aggregate limits in an amount of not less than Five MILLION DOLLARS ($5,000,000) shall be considered equivalent to the said required minimum limits set forth herein above.

If a Commercial General Liability Insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit.

Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Contract, including the use of owned and non-owned real property and automobiles. Insurance coverage shall not be subject to any type of pollution exclusion or owned property exclusions.

2. Automobile Liability.

CONTRACTOR shall carry and maintain Automobile Liability Insurance which provides a minimum coverage of at least $5,000,000 per accident for bodily injury and property damage.

3. Worker's Compensation.

CONTRACTOR shall carry and maintain worker’s compensation in the amount of $1,000,000 as required by the California Labor Code for all persons employed directly or indirectly in connection with this Contract by CONTRACTOR. To the extent that CONTRACTOR utilizes any subcontractor for the performance of any part of the work under this Contract, CONTRACTOR shall require and assure that such subcontractor also carry and maintain worker’s compensation as required by the California Labor Code for all persons directly or indirectly in connection with this Contract.

Page 115 of 840 ends

D-13

4. Additional Insureds.

The CITY, its officers, agents and employees must be named as additional insureds or as additional loss payees in all insurance policies required by this Contract. An endorsement to this effect shall be delivered to CITY prior to the commencement of any work. Satisfaction of any deductible requirement shall be the responsibility of CONTRACTOR. Such insurance shall be primary and noncontributory with any other insurance maintained by the CITY.

5. Notice of Cancellation.

CONTRACTOR agrees to oblige its insurance agent or broker and insures to provide CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

6. Severability Clause.

Each of the policies of insurance shall contain a clause substantially as follows:

The insurance afforded by this policy applies separately to each insured against whom a claim or suit is made or suit is brought, except with respect to the limit of the insurer's liability.

7. Qualifications of Insurer.

All policies of insurance shall be issued by an insurance company acceptable to CITY and authorized to issue said policy in the State of California.

8. Approval of Insurer.

The insurance carrier providing the insurance shall be chosen by CONTRACTOR subject to approval by CITY, provided that such approval shall not be unreasonably withheld.

9. Payment of Premiums.

All premiums on insurance policies shall be paid by CONTRACTOR making payment, when due, directly to the insurance carrier, or in a manner agreed to by CITY.

10. Evidence of Insurance and Claims.

CONTRACTOR shall provide certificates of insurance to CITY as evidence of insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. The CITY’s Risk Manager must approve insurance certificates and endorsements prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.

Page 116 of 840 ends

D-14
(Use of City Bond Form is Required)
EXHIBIT “B”
Faithful Performance Bond

FAITHFUL PERFORMANCE BOND

PUBLIC WORK (CALIFORNIA)
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, the Principal and the City of Montebello (“Obligee”) have entered into a written contract, hereinafter called the Contract, a copy of which is or may be attached hereto, dated the ______ day of ____________________, ______ referred to and made a part hereof for __________________________________________________________________________ and all appurtenant work in accordance with Project No. , which agreement requires the Principal to provide Obligee with this bond.

NOW THEREFORE, we, _______________________________________, as Principal, and ___________________________________________, a corporation organized under the laws of _________________________, and duly authorized to transact business in the State of California, as Surety, are held firmly bound unto the City of _____________________________, as Obligee, in the sum of _________________________________________________________________ Dollars ($_______________________), lawful money of the United States of America, for the payment whereof well and truly to be made the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

The address at which the Surety may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ The address at which the Principal may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ The condition of the foregoing obligation is such that if the Principal, his or its heirs, executors, administrators, successors or assigns, and each of his or its subcontractors shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of said contract, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of said contract that may hereafter be made, then this obligation shall be void; otherwise it shall be and remain in full force and effect.

As part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the obligee in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same

Page 117 of 840 ends

D-15
shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the agreement or to the work or to the specifications.

This document is signed by the respective parties on the dates next to their names.

Principal
By: __________________________________
Title: ________________________________
Surety
By: __________________________________
Title: ________________________________
Date: ________________________________
Date: ________________________________
I declare under penalty of perjury under the laws of the State of California that the contents of the above Faithful Performance Bond are true and correct, and that I have been duly authorized to sign this Faithful Performance Bond on behalf of Surety. This Declaration is signed on , in the City of , State of California.
--OR--
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California )
)
County of ___________________________ )
On ______________ before me, ____________________________________(here insert name and title of the officer), personally appeared ___________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature __________________________________ (Seal)
-- AND –
(Proof of signature authorization or power of attorney must be attached) APPROVED AS TO FORM:
_________________________
City Attorney

Page 118 of 840 ends

D-16
EXHIBIT “C”
Labor and Materials Payment Bond
(Use of City Bond Form is Required)

LABOR AND MATERIAL PAYMENT BOND

PUBLIC WORK (CALIFORNIA)
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, ________________________________________, as Principal, has entered into a contract dated ___________________, _____, (the "Contract") with the City of MONTEBELLO (Obligee) referred to and made a part hereof to perform the following work of public improvement, to wit:
_____________________________________________________________________________________ _____________________________________________________________________________________ __________________________________________________________and all appurtenant work in accordance with the plans and specifications for Project No._______, which requires Principal to file this bond to secure claims made under Civil Code Sections 9550-9554..

NOW THEREFORE, we, ____________________________________, as Principal, and ___________________________________________, a corporation organized under the laws of ______________________ and duly authorized to transact business in the State of California, as Surety, are held firmly bound unto the City of _____________________________, as Obligee, and all subcontractors, laborers, material persons and other persons employed in the performance of the referenced agreement, in the sum of _________________________________________________ Dollars ($_______________________), lawful money of the United States of America, which is 100% of the amount of the Contract, for the payment whereof well and truly to be made the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

The address at which the Surety may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ The address at which the Principal may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ If the above bounden Principal, his or its heirs, executors, administrators, successors, assigns, or any of his or its subcontractors, fails to pay for any materials, provisions, provender, or other supplies, or teams, implements or machinery, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor to persons named in Section 9100 of the Civil Code, or for amounts due under the Unemployment Insurance Code with respect to such work or labor performed under the Contract, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to Section 13020

Page 119 of 840 ends

D-17
of the Unemployment Insurance Code, then the Surety on this bond will pay the same, in an amount not exceeding the sum specified in this bond, and also, in case suit is brought upon this bond, a reasonable attorney's fee, which shall be awarded by the court to the prevailing party in said suit, said attorney's fee to be taxed as costs in said suit and to be included in the judgment herein rendered.

As part of the obligation secured hereby, the Surety shall not be exonerated or released from the obligation of the bond by any change, alteration, or modification in or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement or pertaining or relating to the furnishing of labor, materials, or equipment therefor, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme of work of improvement, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement, or under the bond, nor, where the bond is given for the benefit of claimants, by any fraud practiced by any person other than the claimant seeking to recover on the bond.

This bond shall inure to the benefit of any and all persons, companies and corporations named in Civil Code Section 9100 so as to give them a right of action in a suit on this bond.

This bond is executed for the purpose of complying with the laws of the State of California designated as Title 3, Chapter 5, Payment Bond, commencing with Section 9550 of the Civil Code of the State of California and all amendments thereto, and shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code of the State of California.

This document is signed by the respective parties on the dates next to their names.

Principal
By: _________________________________
Title: ________________________________
Surety
By: _________________________________
Title: ________________________________
Date: ________________________________
Date: ________________________________
I declare under penalty of perjury under the laws of the State of California that the contents of the above Labor and Materials Payment Bond are true and correct, and that I have been duly authorized to sign this Labor and Materials Payment Bond on behalf of Surety. This Declaration is signed on ______ , in the City of _____, State of California.
--OR--

Page 120 of 840 ends

D-18
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California )
)
County of ___________________________ )
On ______________ before me, ____________________________________(here insert name and title of the officer), personally appeared ___________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature __________________________________ (Seal)
-- AND –
(Proof of signature authorization or power of attorney must be attached) APPROVED AS TO FORM:
________________________
City Attorney

Page 121 of 840 ends

GP-1

SPECIAL PROVISIONS
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO

TABLE OF CONTENTS
PART 1 GENERAL PROVISIONS
(NOTE: SECTION NUMBERS CORRESPOND TO THE STANDARD SPECIFICATIONS)

SECTION PAGE

1. TERMS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS GP-4

2. SCOPE OF THE WORK GP-13

3. CONTROL OF THE WORK GP-15

4. CONTROL OF MATERIALS GP-18

5. LEGAL RELATIONS AND RESPONSIBILITIES GP-19

6. PROSECUTION AND PROGRESS OF THE WORK GP-25

7. MEASUREMENT AND PAYMENT GP-26

8. FACILITIES FOR AGENCY PERSONNEL GP-33

9. CITY STANDARDS, STANDARD PLANS & DRAWINGS GP-33

10. CLAIMS AND PROTESTS GP-34
PART 4 EXISTING IMPROVEMENTS
400 PROTECTION AND RESTORATION GP-37
402 UTILITIES GP-38
PART 6 TEMPORARY TRAFFIC CONTROL
600 ACCESS GP-40
601 TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION
AND MAINTENANCE WORK ZONES GP-41
PART 9 BID ITEM DESCRIPTIONS

BID ITEMS PAGE
1 Mobilization/ Demobilization (Not to exceed 3% of total of all other prime contract Bid Items) BD-1
2 Traffic Control BD-3

BID ITEMS PAGE
3 Sawcut and Remove Existing Concrete Sidewalk BD-7
4 Sawcut and Remove Existing Concrete Curb and Gutter BD-8

Page 122 of 840 ends

GP-2
5 Sawcut and Remove Existing Concrete Curb Ramp BD-0
6 Sawcut and Remove Existing Concrete Driveway Approach BD-9 7 Cold Mill Existing Asphalt Concrete (AC) Pavement (2.5” depth) BD-10 8 Prune Tree Roots and Install Root Barriers BD-11
9 Remove Existing Stump BD-11
10 Remove Existing Concrete Electro-Matic Traffic Control System BD-12 11 Sawcut and Remove Existing AC Pavement, Base, Subbase and Native Soil to Provide Clear Depth BD-12
12 Unclassified Excavation BD-14
13 Sawcut and Remove Existing AC Sidewalk or Driveway Approach BD-16 14 Construct 4” Thick Concrete Sidewalk BD-17
15 Construct 6” Thick Concrete Sidewalk at DWAs BD-17
16 Construct Concrete Curb and Gutter BD-17
17 Construct 6” Thick Concrete Curb Ramp BD-18
18 Construct Concrete Driveway Approach BD-18
19 Reconstruct Existing Curb Drain BD-19
20 Plant New Tree (24” Box Jacaranda Tree) BD-19
21 Construct Concrete Block Slough Wall BD-22
22 Furnish and Install New Metal Hand Railing for Curb Ramp BD-23 23 Provide and Place 6"-Thick Crushed Miscellaneous Base (CMB) BD-23 24 Construct 1” Thick AC Leveling Course BD-23
25 Construct 5”-Thick AC Base Course (2 Lifts) BD-28
26 Construct 1.5''-Thick Conventional AC Overlay BD-30
27 Adjust Existing Storm Drain/ Sewer/ Utility Manhole Frames and Covers to Finished Grade BD-32
28 Adjust Existing Water Valve Cans and Covers to Finished Grade BD-33 29 Adjust Existing Water Meter Box and Cover to Finished Grade, Replace Broken Cover/Box BD-33
30 Adjust Existing Traffic Signal Pull Box and Cover to Finished Grade BD-34
31 Adjust Existing Water Vault Covers to Finished Grade BD-34 32 Furnish and Install Traffic Signal Loop Detectors and Connect to DLC BD-34
33 Traffic Signing, Striping, Markings, House Address and Curb Painting BD-35
34 Install Public Improvement Project Signs BD-37
35 Provide Construction Survey BD-38
36 Provide Material Testing Services as Directed by the Engineer - Allowance BD-40

Page 123 of 840 ends

GP-3

SPECIAL PROVISIONS
PART 1 – GENERAL PROVISIONS
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
Except as otherwise provided in the Plans, Special Provisions, Special Specifications, or as modified herein, the work embraced herein shall be done in accordance with the appropriate provisions of the Standard Specifications for Public Works Construction, “Green Book”, 2018 Edition, which are hereinafter referred to as the Standard Specifications.

The intention of the contract documents is to include all plant labor, services, materials, tools, equipment, supplies, transportation, utilities, and all other items and facilities necessary therefore, as provided in the contract documents for the proper execution and completion of the work on the project in strict accordance with the plans and specifications.

The Standard Specifications and Standard Plans of the AGENCY are contained in the 2018 Edition, and applicable amendments to, of the Standard Specifications for Public Works Construction (SSPWC) and Standard Plans for Public Works Construction (SPPWC). Copies of these Standard Specifications and Plans are available from the publisher, Building News, Incorporated, 1612 South Clementine Street, Anaheim, CA 92802, telephone (714) 517-0970.

The AGENCY also uses the Standard Specifications and plans of the State of California Department of Transportation (Caltrans) which Standard Specifications and Plans are available from Caltrans District 7, Los Angeles or Caltrans Office in Sacramento.

The Standard Specifications set forth above will control the general provisions, construction materials, and construction methods for this contract except as amended by the Plans, Special Provisions, or other contract documents. The following Special Provisions are supplementary and in addition to the provisions of the Standard Specifications unless otherwise noted and the section numbers of the Special Provisions coincide with those of the said Standard Specifications. Only those sections requiring elaboration, amendment, specifying of options, or additions are called out.

Page 124 of 840 ends

GP-4
PART 1 – GENERAL PROVISIONS
SECTION 1 – GENERAL
1-2 TERMS AND DEFINITIONS.

In addition to the terms and definitions of subsection 1-2, whenever in the contract documents the following terms are used, they shall be understood to mean and refer to the following:

ALLOWABLE COSTS means those costs not covered by agreed unit prices, which are to be used in calculating adjustments to the Contract Sum.

ALLOWABLE MARKUPS means the percentage of markups for Work not covered by agree unit prices, which are to be used in calculating adjustments to the Contract Sum.

APPLICABLE LAWS means all applicable federal, state and municipal laws (legal and equitable), statutes, building codes, ordinances, regulations and lawful orders (including, without limitation, the City acting in its regulatory capacity) having jurisdiction over the Project, Work, Site, City, or Contractor (including, without limitation, Environmental Laws) and all ordinances, rules and regulations enacted by City. In the event of a conflict between or among Applicable Laws governing Contractor’s performance of the Work, the more stringent shall apply.

APPLICATION FOR PAYMENT means Contractor’s certified application for payment for Work in accordance with the Contract Documents.

ARCHITECT means the individual or firm under contract with City primarily responsible to provide design, engineering and related construction administration for the Project.

AGENC: City of Montebello
BOARD: City Council of the City of Montebello
COUNTY: County of Los Angeles
FEDERAL: United State of America
BIDDING DOCUMENTS means the following collection of documents prepared and issued for the purpose of soliciting Bids for the Work: (1) Invitation to Submit Bids, (2) Instructions to Bidders, (3) Bid Forms, (4) Construction Contract, (5) Special Provisions, (6) Drawings and Schedules, (7) Details, (8) Addenda(s), and (9) those documents, or those portions or provisions of documents that, although not listed among the documents described in Clauses (1) through (8) hereinabove, are expressly cross-referenced therein or attached thereto.

CERTIFICATE FOR PAYMENT means the statement from the Engineer certifying both the undisputed amount of money due to Contractor and the amount of money, if any, that are disputed upon an Application for Payment.

CHANGE means a modification, change, addition, substitution or deletion in the Work or in Contractor’s means, methods, manner, time or sequence of performing the Work arising from any

Page 125 of 840 ends

GP-5
cause or circumstances, including, without limitation, either directly at the request of City or constructively by reason of other circumstances. Use of the term “Change,” in any context, in the Contract Documents shall not be interpreted as implying that Contractor is entitled to an adjustment increasing the Contract Sum or extending the Contract Time on any basis other than for Compensable Change or Compensable Delay.

CHANGE ORDER means a written instrument, signed by City and Contractor in accordance with the requirements of the General Conditions, designating any work that is a change of scope requiring additional expenditure of materials and labor and/or requiring additional time to complete. Its purpose is to establish the terms of City and Contractor’s mutual agreement to an adjustment of the Contract Sum or Contract Time on account of Compensable Change, Deleted Work, Compensable Delay or Excusable Delay.

CHANGE ORDER REQUEST means Contractor’s written request for an adjustment in the Contract Sum and/or Contract Time due to a Compensable Change, Compensable Delay or Deleted Work.

CITY means the City of Montebello, a municipal corporation organized under the laws of the State of California, acting through the City Council or other representatives duly authorized by the City Council to act on City’s behalf.

CITY CONSULTANT means the designated Consultant, other than the Architect, engaged by City (or engaged as a subconsultant to the Architect or Consultant) to provide professional advice with respect to the design, construction or management of the Project.

CITY COUNCIL means the City Council of the City of Montebello.

CLAIM means a written demand or assertion by City or Contractor seeking, as a matter of right, an interpretation of contract, payment of money, recovery of damages or other relief. A CLAIM does not include the following: (1) a tort claims for personal injury or death, (2) stop notice claims, (3) the right of City to specific performance or injunctive relief to compel performance, or (4) any rights remedies, administrative action, and/or penalties that the City has under applicable law.

CLOSE-OUT DOCUMENTS means the warranties, guarantees, maintenance and operations manuals that, along with electronic versions, are required to be delivered by Contractor to the City upon Final Completion of the Project Work.

COMPENSABLE CHANGE means Extra Work: (1) that is the result of (a) Differing Site Conditions, or (b) revisions in Applicable Laws enacted after the execution of the Construction Contract by City and Contractor, (c) a Change requested in a writing signed by the Engineer, or (d) other circumstances involving a Change in the Work or which Contractor is given under the Contract Documents a specific and express right to adjustment of the Contract sum; and (2) that is not caused, in whole or part, by the negligence or willful misconduct of Contractor or a Subcontractor of any Tier or a failure to comply with Contractor’s obligations under the Contract Documents; and (3) for which an adjustment to the Contract Sum is not prohibited by nor waived under the terms of the Contract Documents; and (4) that if performed would require Contractor to incur additional and unforeseeable Allowable Costs that would not have been required to be incurred in the absence of such Extra Work.

Page 126 of 840 ends

GP-6
COMPENSABLE DELAY means a Delay to the critical path of activities affecting Contractor’s ability to achieve Final Completion of the Project Work within the Contract Time, not caused, in whole or in part, by the negligence or willful misconduct of Contractor or a Subcontractor or any Tier or a failure to comply with Contractor’s obligations under the Contract Documents, and that is caused solely by any of the following: (1) a Compensable Change, (2) the active negligence of City, Engineer, Architect, City Consultant or a Separate Contractor, or (3) other circumstances involving Delay for which Contractor is given under the Contract Documents a specific and express right to both an adjustment of the Contract Sum and/or Contract Time.

COMPLETION PUNCH LIST means the list of items of Work to be completed or corrected by Contractor for Final Completion of the Project Work.

CONSEQUENTIAL DAMAGES means damages incurred by either City or Contractor for loss of use, loss of profit or income, loss of revenue, lost opportunity, additional or unabsorbed overhead, loss of management or services, loss of productivity, loss of financing or funding, loss of business reputation, loss of bonding and all similar indirect, economic damages that are caused as a result of either Delay or that result from a termination or suspension (for default or convenience) of all or any portion of the Construction Contract or the Work. Consequential Damages do not include direct or indirect damage or injury to persons or tangible property, including without limitation, the repair or replacement of tangible property damaged or lost.

CONSTRUCTION CONTRACT means the written contract contained in the Bidding Documents and executed between City and Contractor for the Work.

CONTRACT DOCUMENTS means the following collection of documents governing Contractor’s performance of the Work: (1) the Bidding Documents, (2) the Construction Contract between City and Contractor, other terms, conditions and requirements applicable to the performance of the Construction Contract and Work (including General Provisions, any supplemental and Special Provisions and the General Requirements), Drawings, Specifications, Addenda issued prior to execution of the Construction Contract and other documents listed in the Construction Contract and Modifications issued after execution of the Construction Contract, (3) a Change Order signed by both City and Contractor and/or such others, if any, as required by the General Conditions, (4) a Unilateral Change Order signed by City and/or others, if any, as required by the General Conditions, (5) a Field Order signed by City and/or others, if any, as required by the General Conditions, (6) a written order for a Minor Change in the Work issued by the Engineer, and (7) the Declaration of Sufficiency of Funds completed and signed by Contractor.

CONTRACT SUM means the total amount of compensation stated in the Construction Contract, including adjustments authorized by Change Orders or Unilateral Change Orders, that is payable to Contractor for the performance of the Work in accordance with the Contract Documents.

CONTRACT TIME means the total number of working days set forth in the Construction Contract within which Contractor is obligated to submit Materials Confirmations and achieve Completion and Final Completion of the Project Work and/or Project Work, as adjusted for extensions of time permitted under the terms of the Contract Documents and approved by City.

CONTRACTOR means the person or entity under contract with City pursuant to the Construction Contract to serve as the general contractor for construction of the Work.

Page 127 of 840 ends

GP-7
DAY, whether capitalized or not, and unless otherwise specifically provided, means Monday, Tuesday, Wednesday, Thursday, Friday, and does not include weekends or City recognized legal holidays.

DEFECTIVE WORK means Work by Contractor or a Subcontractor that is unsatisfactory, faulty, omitted, incomplete, deficient or does not conform to Applicable laws, the Contract Documents or the requirements of any inspection, reference standard, test, code or approval specified in the Contract Documents.

DELAY, whether capitalized or not, means any circumstances involving delay, disruption, hindrance or interference in the performance of the Work.

DELETED WORK means work that is eliminated due to a Change requested by City.

DESIGN DOCUMENTS means all plans, drawings, tracings, specifications, programs, reports, calculations, models, presentation materials and other materials or documents containing designs, specifications or engineering information prepared by the Architect, City Consultants, Contractor, Separate Contractors or Subcontractors including, without limitation, computer aided design materials, electronic data files and paper copies. The term “Design Documents” includes, without limitation, all building and other designs depicted therein, as well as the written documents themselves.

DIFFERING SITE CONDITION means an unforeseen condition at a Site or in Existing improvements at a Site. Specifically they are those conditions, located at a Site or in Existing Improvements, not otherwise ascertainable by Contractor through the exercise of thorough care and diligence in its inspection of the Sites and Bidding Documents, that constitute: (1) hazardous materials that constitute hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of Applicable Laws; or (2) subsurface or concealed conditions at the Sites or concealed conditions in Existing Improvements which differ materially from those indicated by the Contract Documents or other information available to Contractor prior to submission of the Bid; or (3) unknown physical conditions at the Sites or concealed conditions in Existing improvements of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the Work of the character provided for in the Contract Documents.

DISCOVERY DATE, used in reference to Contractor’s obligation to give written notice of certain facts, conditions or circumstances, means the earlier of the dates the Contractor either: (1) discovered such facts, conditions or circumstances, or (2) should have discovered such facts, conditions or circumstances in the exercise of reasonable care practiced by the general contractors performing public works construction projects in the Southern California area.

DRAWINGS means the graphic and pictorial portions of the Contract Documents prepared by the Architect or a City Consultant showing the design, location and dimensions of the Work, including plans, elevations, details, schedules and diagrams. The term “Drawings” is used interchangeably with “Plans.”

Page 128 of 840 ends

GP-8
ENGINEER means the City Engineer or the Public Works Director for City of Montebello acting either directly or through properly authorized agents, acting within the scope of the particular duties entrusted to them.

EXCUSABLE DELAY means a Delay, other than a Compensable Delay, to Contractor’s ability to perform within the Contract Time that is (1) not caused, in whole or in part, by the negligence or willful misconduct of Contractor or a Subcontractor of any Tier or a failure to comply with the obligations of Contractor under the Contract Documents; and (2) is unforeseeable, unavoidable and beyond the control of Contractor and the Subcontractor, of any Tier; and (3) the result of a Force Majeure Event. Without limitation to the foregoing, neither the bankruptcy, insolvency nor financial inability of Contractor or any Subcontractor, nor any failure by a Subcontractor to perform any obligation imposed by contract or Applicable Laws, shall constitute grounds for Excusable Delay.

EXTRA WORK means Work (other than Work that is either a logical evolution of the Consultant’s detailing, refinement and clarification of the Drawings and Specifications that are part of the Contract Documents or that is reasonably inferable as necessary to satisfy the design intent for a completed and fully operational system, facility or structure) that is not indicated by the Contract Documents, the performance of which requires the expenditure by Contractor of additional and unforeseen Allowable Costs. Reference to Extra Work shall not be interpreted to mean or imply that Contractor is entitled to an adjustment to the Contract Sum or Contract Time unless such Extra Work constitutes a Compensable Change.

FIELD ORDER means a written directive signed by the City and Contractor that: (1) directs the performance of a Minor Change, (2) directs performance of Work or a Change with respect to which there exists a dispute or question regarding adjustment of the Contract Sum or Contract Time, or (3) establishes a mutually agreed basis for compensation to Contractor for a Compensable Change or Deleted Work under circumstances where performance needs to proceed in advance of the Contractor having completed its substantiation and evaluation of the impact thereof on the Contract Sum or Contract Time.

FINAL COMPLETION, FINALLY COMPLETE means (1) with respect to Project Work, the point at which the following conditions have occurred with respect to such Work: (a) the entirety of such Work is fully completed, including all minor corrective, or “punch list,” items, (b) a permanent and unconditional waiver for the entirety of such Work has been delivered to City, (c) all documents required to be submitted, including without limitation, warranties, guaranties and other Close-Out Documents, (d) such Work and the related portions of the Site have been thoroughly cleared of all construction debris and cleaned in accordance with the requirements of the Contract Documents, including, but not necessarily limited to where applicable, the following:
removal of temporary protections; removal of marks, stains, fingerprints and other soil and dirt from painted, decorated and natural-finished woodwork; removal of spots, plaster, soil and paint from ceramic tile, marble and other finished materials; all surfaces, fixtures, cabinet work and equipment are wiped in accordance with recommendations of the manufacturer; and all stone, tile and resilient floors are cleaned thoroughly in accordance with manufactures recommendations and buff dried by machine to bring the surfaces to sheen, and (d) all conditions set forth in the Contract Documents for completion of such Work have been, and continue to be, fully satisfied; and (2) with respect to the Project Work, the point at which: (a) all of the conditions set forth in Clause (1) of the Paragraph have occurred for each and every Home comprising the Project; and (b) all

Page 129 of 840 ends

GP-9
contractors and subcontractors have been paid and there are no outstanding stop orders claims or claims of any kind that may delay the payment by the City of its ten-percent self-retention monies.

FORCE MAJEURE EVENT means, and is restricted to, any of the following: (1) Acts of God, (2) terrorism or other acts of public enemy, (3) acts or omissions of Governmental Authorities beyond the reasonable foreseeability and control of Contractor, (4) epidemics or quarantine restrictions, (5) strikes, other than those resulting from a violation by Contractor or a Subcontractor of Applicable Laws or applicable collective bargaining agreements, resulting in the unavailability of workers or replacement workers, (6) acts or omissions of the Homeowner that Delay access to a Home or performance of the Work, or (7) unusual shortages in materials that are supported by documented proof that (a) Contractor made every effort to obtain such materials from all available sources located within a reasonable distance of the Site where those materials are to be used in performing the Work, (b) such shortage is due to the fact that such materials are not physically available or could not have been obtained only at exorbitant prices entirely inconsistent with current rates taking into account the quantities involved and the usual industry practices in obtaining such quantities, and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated at the timed the Construction Contract was entered into.

GENERAL CONDITIONS means the herein set forth general terms and conditions.

HAZARDOUS SUBSTANCE means: (1) any chemical, material or other substance defined as or included within the definition of “hazardous substances,” “hazardous wastes”, “extremely hazardous substances,” “toxic substances”, “toxic material”, “restricted hazardous waste”, “special waste”, “contamination”, or words of similar import under any Environmental Law, including without limitation, the following: petroleum (including crude oil or any fraction thereof), asbestos, asbestos-containing materials, polychlorinated biphenyls (“PCB:”) and PCB-containing materials, whether or not occurring naturally; (2) lead paint, or (3) any substance that because of its quantity, concentration or physical or chemical characteristics poses a significant present or potential hazard to human health and safety or to the environment, and which has been determined by any Governmental Authority to be a hazardous waste or hazardous substance.

INSPECTOR OF RECORD means the Inspector responsible, among others, for conducting inspections of Project Work.

LABORATORY means the designated laboratory authorized by the Engineer to test materials and work involved in the contract.

LOSS, LOSSES mean any and all economic and non-economic injuries, losses, costs, liabilities, claims, damages, actions, judgments, settlements, expenses, fines and penalties. “Losses” do not include attorney’s fees or court costs, whether arising as an expense or cost or legal proceeding to which Contractor is a party or as a consequential damage claimed against Contractor by any third person.

MINOR CHANGE means a Change in the Work that does not involve either performance of Extra Work or an adjustment to the Contract Sum or Contract.

MODIFICATION means a written agreement of City and Contractor that amends, adds to or revises the provisions of the Construction Contract or other Contract Documents.

Page 130 of 840 ends

GP-10
NOTICE OF COMPLETION means the written notice by Engineer confirming the date that the Project Work is Finally Completed.

NOTICE TO PROCEED means the written notice issued by City to Contractor to begin the Project Work.

PLANS means the graphic and pictorial portions of the Contract Documents prepared by the Architect or a City Consultant showing the design, location and dimensions of the Work, including plans, elevations, details, schedules and diagrams. The term “Plans” is used interchangeably with “Drawings.”
PROGRESS PAYMENTS means a monthly payment of a portion of the Contract Sum based on Contractor’s progress in the performance of the Work.

PROJECT COMPLETION DATE means the point at which the Project Work is: (1) sufficiently and entirely complete in accordance with Contract Documents so that such Work can be utilized for its intended purpose, (2) receipt by City of all permits and certificates by Governmental Authorities, if any, required to occupy and use such Work, and (3) all systems included in the Work are operational as specified, all designated or required inspections and certifications by Governmental Authorities have been made and posted and has been completed.

PROJECT OR PROJECT WORK means the totality of the Work to be performed by Contractor under the terms of the Contract Documents covered by the Project Contract.

REQUEST FOR EXTENSION means a formal written request required to be submitted by Contractor setting forth the justification and support for Contractor’s request for adjustment in the Contract Time due to an Excusable Delay or Compensable Delay.

REQUEST FOR INFORMATION means a written request by Contractor for clarification of what it perceives to be discrepancies in the Contract Documents, including, without limitation, information in the Contract Documents constituting errors, omissions, conflicts, ambiguities, lack of coordination, noncompliance with Applicable Laws or variances between the information in the Contract Documents and field conditions.

SPECIFICATIONS mean the portion of the Bidding Documents consisting of the written requirements for materials, equipment, standards and workmanship for the Work and performance of related services.

SPECIAL DAYS means the local holiday shopping season from the second Friday of December through Christmas Day.

SUBCONTRACTOR means a person or entity that has a contract to perform a portion of the Work, including without limitation, subcontractors, sub-subcontractors, suppliers and vendors, of any and every Tier.

SURETY means Contractor’s surety issuing the Bid, Performance and/or Labor and Material Bonds.

Page 131 of 840 ends

GP-11
TIER means the contractual level of a Subcontractor with respect to Contractor. For example, a “first-tier” Subcontractor is under contract with Contractor. A sub-subcontractor under contract with a first-tier Subcontractor is in the “second tier,” and so on. Use of the phrase “of every tier”, or similar phraseology, in the Contract Documents shall not be interpreted as implying that other provisions of the Contract Documents, where such phases are not used, are intended to be limited application to only the first Tier or to only certain Tiers of Subcontractors.

UNEXCUSED DELAY means any Delay that is not a Compensable Delay or Excusable Delay, including, without limitation, the following: (1) Delay caused by Contractor’s failure to comply with the Contractor’s Documents, (2) Delay for which Contractor has failed to provide timely and complete Request for Extension, or (3) Delay associated with any circumstances where costs or risk associated with such circumstances are designated in the Contract Documents as being at Contractor’s risk or Contractor’s Own Expense.

UNILATERAL CHANGE ORDER means a writing signed by City in accordance with the General Conditions, in which City unilaterally sets forth its determination of the amount of adjustments to the Contract Sum or Contract Time due to a Compensable Change, Compensable Delay or Deleted Work.

WORK means the labor, materials, equipment, services, permits, licenses and taxes and all other things necessary for Contractor to perform its obligations under the Contract Documents, including, without limitation, any Changes requested by City.

WORKING DAY means Mondays, Tuesdays, Wednesdays, Thursdays and Fridays. It does not include Saturdays, Sundays, or Holidays recognized by the City of Montebello.

Other terms appearing in the Standard Specifications shall have the intent and meaning specified therein.
1-7 AWARD AND EXECUTION OF THE CONTRACT.
1-7.1 General.

Subsection 1-7.1 of the Standard Specifications is hereby replaced with the following:

Within ten working days after the date of the AGENCY’s notice of award, the Contractor shall execute and return the following contract documents to the AGENCY:
• Contract Agreement
• Faithful Performance Bond
• Material and Labor Bond
• Public Liability and Property Damage Insurance Certificate • Worker’s Compensation Insurance Certificate
• Project Schedule

Page 132 of 840 ends

GP-12
Failure to comply with these requirements will constitute non-responsiveness on the part of the Contractor and will result in annulment of the award by the Agency and forfeiture of the Proposal Guarantee by the Contractor.

The Contract Agreement shall not be considered binding upon the AGENCY until executed by the authorized AGENCY official.

A corporation to which an award is made may be required, before the Contract Agreement is executed by the AGENCY, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and of the authority of its officers to sign contracts and bonds for the corporation.
1-7.2 CONTRACT BONDS.

The second sentence of the fourth paragraph of Subsection 1-7.2 of the Standard Specifications is hereby deleted and replaced with the following: The Faithful Performance Bond (Warranty Bond) shall remain in force until one (1) year of recordation of the Notice of Completion. The Material and Labor Bond shall remain in force until thirty-five days after the date of recordation of the Notice of Completion.

The second and third sentences of the third paragraph of Subsection 1-7.2 of the Standard Specifications are hereby deleted and replaced with the following: The “Payment Bond” (Material and Labor Bond) shall be for not less than 50 percent of the contract price, to satisfy claims of material suppliers and of mechanics and laborers employed by it on the work. The Payment Bond shall remain in effect until thirty-five days after the date of recordation of the Notice of Completion.
1-8 SUBCONTRACTS
The Contractor shall perform or provide, with its own organization, contract labor, materials, and equipment amounting to at least 50 percent of the Contract Price. The contract labor performed or provided by the Contractor shall amount to at least 25 percent of the total contract labor for the Contract. Contract labor shall exclude the Contractor’s superintendent. Any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the Contract Price before computing the amount of contract labor, materials, and equipment required to be performed or provided by the Contractor with its own organization. Where an entire item is subcontracted, the value of contract labor, materials, and equipment subcontracted will be based on the estimated percentage of the Contract Unit or Lump Sum Price, determined from information submitted by the Contractor, subject to approval by the Engineer.

The Contractor with the bid package shall submit a list of all subcontractors intended to perform work on the project. This list shall include the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in

Page 133 of 840 ends

GP-13
an amount in excess of one-half of one percent of the prime contractors total bid. The prime contractor shall provide a description by bid item number or otherwise fully designate the portion of work to be performed by each subcontractor.

SECTION 2 – SCOPE OF THE WORK
2-2 PERMITS.

The text of Subsection 2-2 of the Standard Specifications is hereby deleted and replaced with the following:

Prior to the start of any work, the Contractor shall take out the applicable City permits and make arrangements for City inspections. The City will issue the permits at no charge to the Contractor.

The Contractor and all subcontractors shall each obtain a City business license, and shall be licensed in accordance with the State Business and Professions Code. The Contractor shall also obtain any and all other permits, licenses, inspections, certificates, or authorizations required by any governing body or entity.

The Contractor shall pay all costs incurred by the permit requirements.

Wherever the property of the Federal Government, the State of California, the County of Los Angeles, the City of Montebello, any local utilities, or of any other agency affected by the work included in this contract, the Contractor shall bear the cost of all permits and inspection lawfully exacted by said Government, State, County, City, District, Department, or other agency during the time of performing the work affecting said property; also, the Contractor shall bear all cost of traffic regulation and traffic control devices lawfully exacted by said State, County, City, or other agency during the time of performing the work affecting said property.

Where required under the terms of the permits, the Contractor shall obtain liability insurance acceptable to and in an amount required by the public agency having jurisdiction. The policy shall insure said agency against all claims arising out of or in connection with the work to be performed and shall remain in full force and effect until the work is accepted by the City. The Contractor shall furnish to each such agency a certificate of protective liability insurance showing the protection afforded and the amount thereof.

Neither the terms hereof nor anything shown on the drawings in connection with rights-of-way provided by the City shall be construed to entitle the Contractor to conduct operations in said rights-of-way in violation of existing regulations restricting interference with watercourses and drainage channels. The Contractor shall take adequate precautions against obstructing storm water flow in any affected watercourse or channel, and shall not deposit excavated materials in any area where they might interfere with or be subject to erosion from such flow. 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES.

The following is hereby added to this subsection of the Standard Specifications:
2-5.5 A noise level limit of 86 dba at the distance of fifty feet shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases required for the protection of personnel.

Page 134 of 840 ends

GP-14
2-5.6 All noise producing project equipment and vehicles using internal combustion engines shall be equipped with mufflers, and air inlet silencers where appropriate, in good operating condition that meet or exceed original factory specifications. Mobile or fixed “package” equipment (e.g. arc-welders, air compressors) shall be equipped with shrouds and noise control features that are readily available for that type of equipment. 2-5.7 All mobile or fixed noise producing equipment used on the project, which is regulated for noise output by a local, state, or federal agency, shall comply with such regulation while in the course of project activity.
2-5.8 Electrically powered equipment instead of pneumatic or internal combustion powered equipment shall be used, where feasible.
2-5.9 Material stockpiles and mobile equipment staging, parking, and maintenance areas shall be located as far as practical from residences.
2-5.10 The hours of conventional construction activities shall be restricted to the periods and days permitted by the local noise or other applicable ordinance. In accordance with the City of Montebello Noise Ordinance, these activities include (but are not limited to) construction, noisy maintenance activities, all spoils and material transport, demolition, and grading and are prohibited between the hours of 4:00 p.m. and 8:00 a.m. on weekdays (Monday through Friday), Saturday and Sundays, and legal holidays, except in cases of emergency as determined and approved in writing by the City Engineer.
2-5.11 The use of noise producing signals, including horns, whistles, alarms, and bells shall be for safety warning purposes only.
2-5.12 No project related public address, paging, two-way radio, or music system shall be audible at any adjacent residence.
2-5.13 The on-site construction supervisor shall have the responsibility and authority to receive and resolve noise complaints. An appeal process to the City shall be established prior to construction commencement that will allow for resolution of noise problems that cannot be immediately solved by the site supervisor.
2-5.14 The Contractor shall develop a project noise control plan, which shall be approved and implemented prior to commencement of any construction activity. 2-5.15 Noise control features and plans shall be reviewed and approved by a noise control engineering professional.
2-5.16 Contract incentives may be offered to the construction contractor to minimize or eliminate noise complaints resulting from project activities.
2-5.17 The erection of temporary sound wall barriers shall be considered where project activity is unavoidably close to residences.

Page 135 of 840 ends

GP-15
2-5.18 Caltrans Standard Specifications (Sections 7 and 42) and Standard Special Provisions (that provide limits on construction noise levels) shall be applied and enforced by the City on the project Contractor.
2-5.19 Arrange noisiest operations together in the construction program to avoid continuing periods of annoyance.
2-5.20 If practical, implement project noise abatement features prior to construction.

SECTION 3 – CONTROL OF THE WORK
3-2 SELF-PERFORMANCE.

The whole paragraph of Subsection 3-2 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall perform or provide, with its own organization, contract labor, materials, and equipment amounting to at least 50 percent of the Contract Price. The contract labor performed or provided by the Contractor shall amount to at least 25 percent of the total contract labor for the Contract. Contract labor shall exclude the Contractor’s superintendent. Any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the Contract Price before computing the amount of contract labor, materials, and equipment required to be performed or provided by the Contractor with its own organization. Where an entire item is subcontracted, the value of contract labor, materials, and equipment subcontracted will be based on the estimated percentage of the Contract Unit or Lump Sum Price, determined from information submitted by the Contractor, subject to approval by the Engineer.

The Contractor with the bid package shall submit a list of all subcontractors intended to perform work on the project. This list shall include the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractors total bid. The prime contractor shall provide a description by bid item number or otherwise fully designate the portion of work to be performed by each subcontractor.
3-7 CONTRACT DOCUMENTS.

The contract comprises the following documents, including all additions, deletions, modifications, and appendices and all addenda as prepared prior to the date of bid opening setting forth modifications or interpretations of any of said documents:

The Notice of Inviting Bids, the Instructions to Bidders, the accepted Proposal, the List of Subcontractors, the Bid Security Forms, the Agreement, the Faithful Performance Bond, the Payment Bond, Bid Bond, the Plans, General Provisions and the Special Provisions.

Page 136 of 840 ends

GP-16
3-7.1 General.

The following is hereby added to this subsection of the General Specifications:

The Contractor shall maintain a control set of Plans and Specifications on the project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on this control set to show the as-built conditions. Upon completion of all work, the Contractor shall return the control set to the Engineer. Final payment will not be made until this requirement is met.
3-7.2 PRECEDENCE OF THE CONTRACT DOCUMENTS.

The whole Subsection 3-7.2 of the Standard Specifications is hereby deleted and replaced with the following:

All of the CONTRACT DOCUMENTS shall be read as complimentary to one another and requiring the highest quality, highest quantity, and highest standard of performance for the Project for the City’s benefit. In the case of a direct conflict between any of the CONTRACT DOCUMENTS, the order of precedence of the CONTRACT DOCUMENTS shall be:

FIRST: Requirements of law, including the Charter and Ordinances of the City.

SECOND: Permits from other Agencies as may be required by law or Ordinance.

THIRD: Permits from City Departments as may be required by law or Ordinance.

FOURTH: Change Orders and/or Supplemental Agreements; whichever occurs last.

FIFTH: Contract/Agreement.

SIXTH: Addenda.

SEVENTH: Bid/Proposal.

EIGHTH: Special Provisions.

NINETH: Plans.

TENTH: Standard Plans.

ELEVENTH: Standard Specifications.

TWELFTH: Reference Specifications.

Detailed plans shall have precedence over general plans.

Page 137 of 840 ends

GP-17
3-10 SURVEYING.
3-10.1 General.

The whole Subsection 3-10.1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall provide construction survey for all the streets shown in the contract documents, including office research of notes, plats or other necessary documents; marking removal limits; grade staking; tying and relocating utilities. All work shall be done to the satisfaction of the Engineer.

The Contractor shall notify the City of Montebello, in advance, in the event that any monumentation or witnesses to the monumentation should fall within any removal area.

The Contractor shall be liable for a back charge in an amount up to $1,000.00 per point obliterated or destroyed without notice or authorization from the City of Montebello.

Any questionable grade, elevation, location or element of design shown on the plans shall be brought to the immediate attention of the Engineer in writing for clarification prior to construction.

The City reserves the right to verify all staking and monumentation for horizontal and vertical accuracy. The allowable error shall not exceed 0.02 feet vertically or horizontally. Any staking found to exceed allowable error shall be reset at the sole expense of the Contractor and no additional compensation will be made therefore. In cases where the Contractor is unable to place a monument, such as conflicts with underground utilities, the Contractor shall notify the Engineer for review, confirmation, and approval of the omission. All work described in this Section shall be done by or under the direction of a Professional Land Surveyor or a Registered Civil Engineer authorized to practice Land Surveying in the State of California herein referred to as “Surveyor”. 3-10.2 Line and Grade.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s Surveyor shall have all the necessary tools, materials, personnel available at the job site for setting blue, yellow and red top hubs at the time that they are set, and shall adequately reference all such stakes by setting hubs three (3) inches below subsurface.

The Surveyor shall have the option of establishing line and grade either by setting stakes to finished grade, marking the cuts and fills on the pavement, or referring to stakes, spikes, drill holes, chisel cuts, etc., on a grade sheet. Normally, stakes will be set and stationed by the Surveyor for rough grade, curbs, headers, sewers, storm drains, and structures and a corresponding cut or fill to finished grade (or flow line) indicated on a grade sheet. If the Surveyor elects to set stakes to the finished grade, the top of these stakes will be colored with blue crayon or paint. All elevations will be established with a Surveyor’s level or Theodolite.

For street improvements, the Surveyor will establish rough grade elevations at 50-foot intervals along the street. After completion of the rough grading, he/she will establish elevations for curb

Page 138 of 840 ends

GP-18
or pavement headers. An elevation for pavement will be established at all points indicated by elevations shown on the plans. Elevations will be established at 25-foot intervals on the centerline and at all grade changes. For resurfacing over existing pavement or constructing 2 or 3 course bituminous pavement, the Surveyor will paint data on the surface of the existing pavement and/or base course and each lift to indicate the fill to finished grade at such locations and intervals as to provide adequate control for laying the wearing surface course to finished grade.

Flow line elevations will be established by the Surveyor at all changes in grade and at 25-foot intervals when the grade is greater than 0.50% and at 10-foot intervals for grades of 0.50% or less.

For flow lines adjacent to curbs on grades 0.10% or over, when the curb is new and has a uniform curb face, flow line elevations will not be set on existing curbs, the grade of which may be irregular, grade points will be set at all changes in grade and at 25-foot intervals. Sufficient flow line elevations will be set to facilitate the construction of warped pavement sections or for special drainage conditions.

For integral curb and gutter, blue tops for the flow line will not be set but curb elevations shall be established at all changes in grade and at 25-foot intervals when the grade is more than 0.50% and at 10-foot intervals when the grade is 0.50% or less. In the case of integral curb and gutter with a varying curb face, grade sheets will show cuts and fills to the top of the curb or to the flow line and indicate the required curb face.

For storm drains, the Surveyor will establish elevations at 25-foot intervals along the main line, at all grade change points indicated on the plans, at inlets and outlets of structures and at the upper ends of house connections and laterals. Normally, elevations for narrow trenches will be established by means of offset stakes and a grade sheet giving cuts from such stakes will be issued.

When determined necessary, blue top hubs will be set in the trench for line and grade. Narrow trenches where there are space constraints due to utility conflicts must be approved by the Engineer and must compile with Slurry mix backfill according to Section 306-12.2 of the Greenbook. Use of slurry mix backfill shall include furnishing material, labor, tools, equipment and incidentals, and for doing all work involved in installing slurry mix backfill, as specified in the Standard Specifications, these Special Provisions, and as directed by the Engineer; and included in the cost for storm drain pipeline. No additional compensation shall be allowed.

Distances and measurements, except elevations and structural dimensions, are given and made on horizontal planes.

Copies of all grade sheets shall be provided to the Engineer for filing.

SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL.

The following is hereby added to this subsection of the Standard Specification:

The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire work will meet all requirements of this contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the AGENCY, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one (1) years after the date of recordation of the Notice of Completion. Within this one-year

Page 139 of 840 ends

GP-19
period, the Contractor shall also restore to full compliance with requirements of this contract any portion of the work which is found to not meet those requirements. The Contractor shall hold the AGENCY harmless from claims of any kind arising from damages due to said defects or noncompliance. The Contractor shall make all repairs, replacements, and restorations within thirty (30) days after the date of the City Engineer’s written notice. 4-6 TRADE NAMES.

The first and second paragraphs of this subsection of the Standard Specifications are hereby replaced with the following:

Although the bidder may believe that by use of a different material than that specified on/in the plans and specifications, a lower cost project/bid may result. The bidder is to bid the project on the basis of using the material(s) as named keeping in mind that all materials named herein by manufacturer is not to prohibit the bidder considering using in his bid what he consider to be an equal material except where the AGENCY has designated a sole product. Once the bids have been opened the successful Contractor may discuss with the AGENCY the use of another product; which may result in a determination by the AGENCY that the other product is equal and possibly that by the AGENCY allowing the use of the Contractor proposed equal that a change in the contract amount may result.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-3 LABOR.
5-3.2 Prevailing Wages.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor, and all subcontractors, suppliers and vendors, shall comply with all AGENCY, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing rates as established by the Director of Industrial Relations of the State of California.

The Contractor shall not pay less than these rates.

The following subsection(s) are hereby added to Section 5-3 of the Standard Specifications 5-3.6 Laws.

The Contractor, and all subcontractors, suppliers and vendors, shall comply with all City, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing

Page 140 of 840 ends

GP-20
rates as established by the Director of Industrial Relations of the State of California. The Contractor shall not pay less than these rates.
5-4 INSURANCE.
5-4.2 General Liability Insurance.

The whole Subsection 5-4.2 of the Standard Specifications is hereby deleted and replaced with the following:

CONTRACTOR shall carry and maintain Comprehensive General Liability Insurance which provides the following:

Minimum coverage: Bodily injury limits of $2,000,000 for each person and $2,000,000 for each occurrence; property damage limits of $2,000,000 for each occurrence, $5,000,000 aggregate.

Products/Completed Operations Hazard Insurance in an amount of not less than FIVE MILLION DOLLARS ($5,000,000).

A combined single limit policy with aggregate limits in an amount of not less than Five MILLION DOLLARS ($5,000,000) shall be considered equivalent to the said required minimum limits set forth herein above.

If a Commercial General Liability Insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit.

Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Contract, including the use of owned and non-owned real property and automobiles. Insurance coverage shall not be subject to any type of pollution exclusion or owned property exclusions.
5-4.3. Worker's Compensation Insurance.

The following is hereby added to this subsection of the Standard Specification:

CONTRACTOR shall carry and maintain worker’s compensation in the amount of $1,000,000 as required by the California Labor Code for all persons employed directly or indirectly in connection with this Contract by CONTRACTOR. To the extent that CONTRACTOR utilizes any subcontractor for the performance of any part of the work under this Contract, CONTRACTOR shall require and assure that such subcontractor also carry and maintain worker’s compensation as required by the California Labor Code for all persons directly or indirectly in connection with this Contract.
5-4.4 Auto Liability Insurance.

The whole Subsection 5-4.4 of the Standard Specifications is hereby deleted and replaced with the following:

Page 141 of 840 ends

GP-21
CONTRACTOR shall carry and maintain Automobile Liability Insurance which provides a minimum coverage of at least $5,000,000 per accident for bodily injury and property damage.

The following is hereby added to subsection 5-4 of the Standard Specifications:
5-4.5 Additional Insureds.

The CITY, its officers, agents and employees must be named as additional insureds or as additional loss payees in all insurance policies required by this Contract. An endorsement to this effect shall be delivered to CITY prior to the commencement of any work. Satisfaction of any deductible requirement shall be the responsibility of CONTRACTOR. Such insurance shall be primary and noncontributory with any other insurance maintained by the CITY. 5-4.6 Notice of Cancellation.

CONTRACTOR agrees to oblige its insurance agent or broker and insures to provide CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. 5-4.7 Severability Clause.

Each of the policies of insurance shall contain a clause substantially as follows:

The insurance afforded by this policy applies separately to each insured against whom a claim or suit is made, or suit is brought, except with respect to the limit of the insurer's liability.
5-4.8 Qualifications of Insurer.

All policies of insurance shall be issued by an insurance company acceptable to CITY and authorized to issue said policy in the State of California. 5-4.9 Approval of Insurer.

The insurance carrier providing the insurance shall be chosen by CONTRACTOR subject to approval by CITY, provided that such approval shall not be unreasonably withheld. 5-4.10 Payment of Premiums.

All premiums on insurance policies shall be paid by CONTRACTOR making payment, when due, directly to the insurance carrier, or in a manner agreed to by CITY. 5-4.11 Evidence of Insurance and Claims.

CONTRACTOR shall provide certificates of insurance to CITY as evidence of insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. The CITY’s Risk Manager must approve insurance certificates and endorsements prior to commencement of performance. Current certification of insurance shall be kept on file with the

Page 142 of 840 ends

GP-22
CITY at all times during the term of this Contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. 5-7 SAFETY.
5-7.1 Work Site Safety.
5-7.1.1 General.

The following is hereby added to subsection 5-7.1.1 of the Standard Specifications:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the AGENCY for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the AGENCY does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

The following subsection(s) are hereby added to Section 5-7 of the Standard Specifications:
5-7.9 Traffic and Access.

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight (48) hours (2 working days) prior to any temporary obstruction of access. Contractor to revise all dates daily on no-parking signs. If works does not begin on the date posted on the no-parking sign, Contractor then shall replace all signs with the new correct dates. Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The Contractor must submit a traffic

Page 143 of 840 ends

GP-23
control plan to the City and obtain approval of same in writing from the City Engineer. The Contractor shall maintain at least one lane of traffic in each direction at all times during construction. The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

There are some driveways that require replacement in order to be handicap compliant. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.

Under situations of driveway closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.
5-7.9.1 Street Closures, Detours, Barricades.

This subsection is hereby added to section 5-7.9 of the Standard Specifications:

Street closures will not be allowed except as specifically permitted by the Engineer.

At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed written plan for traffic control and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Page 144 of 840 ends

GP-24
Temporary traffic channelization shall be accomplished with barricades, K-rail sections or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer.

The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor, and deduct same from the next progress payment
5-7.9.2 Protection of the Public.

This subsection is hereby added to section 5-7.9 of the Standard Specifications:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

Page 145 of 840 ends

GP-25
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s proposed Construction Schedule shall be submitted to the Engineer within ten working days after the date of the Agency’s execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.

Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed Construction Schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures.

The Contractor shall submit periodic Progress Reports to the Engineer by the last day of each month. The Report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-3 TIME OF COMPLETION.
6-3.1 General.

This subsection of the Standard Specifications shall be replaced by the following:

All construction work is to be completed within seventy-five (75) working days. 6-3.2 Contract Time Accounting.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s activities shall be confined to the hours between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding holidays, for daytime work and to the hours between 8:00 p.m. starting Monday and 5:00 a.m. ending Saturday, excluding holidays, for nighttime work. Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor. Should the Contractor choose nighttime work, any and all lighting and traffic control, as needed, shall be provided by the Contractor. 6-9 LIQUIDATED DAMAGES
The liquidated damages value is hereby amended to be $500.00 per day.

Page 146 of 840 ends

GP-26
SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.2 Partial and Final Payment.

The text of Subsection 7-3.2 of the Standard Specifications is hereby deleted and replaced with the following:

The closure date for the purpose of making partial progress payments will be on or about the twenty-fifth (25th) day of each month. The Contractor shall prepare the approximate measurement of the work performed through the closure date and submit it to the AGENCY for approval along with an updated construction schedule.

When the work is complete, the Engineer will determine the final quantities of the work performed and prepare the final progress payment.

Payments are commonly authorized and made within forty-five days following the last day of the month submitted. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as-built conditions and any other required documents.

A full five percent (5%) retention will be deducted from all progress payments. The final retention will be authorized for final payment forty-five (45) days after the date of recordation of the Notice of Completion.

Decisions to Withhold Progress Payments
The Engineer may withhold or nullify the requested Progress Payments in whole or in part due to the Contractor to such extent as may be necessary to protect the City from loss as a result of because of any of the circumstances listed below:

1. Defective work not remedied in accordance with provisions of the Contract Documents;

2. Third party claims, liens or stop notices filed or reasonable evidence indicating probable filing of such claims, liens or stop notices;

3. Failure of the Contractor to make payments properly for labor, services, materials, equipment, or other facilities or to subcontractor;

4. A reasonable doubt that the work can be completed for the unpaid balance of the Contract Sum;

5. A reasonable doubt that the Contractor will complete the work within the agreed Contract Time;

6. Costs to the Owner resulting from failure of the Contractor to complete the work within the stipulated time, or in accordance with the terms of the contract;

Page 147 of 840 ends

GP-27

7. Damage to other work or property;

8. Failure to fulfill all the requirements of the Contract Documents;

9. When there is pending litigation against the City related to this contract or reasonable anticipation thereof;

10. Failure of the contractor to maintain all records as required; to submit progress schedules, weekly payroll records, minority enterprise utilization reports and forms and any other such item required by these specifications;

11. Failure to pay laborers and mechanics employed by the contractor or any subcontractor on the work the full amount of wages required by this contract, after written notice to the contractor.

12. Failure of Contractor of the subcontractors to comply with applicable laws;

13. Any reason specified elsewhere in the Contract Documents as grounds for a withholding, offset or setoff or that would legally entitle City to a setoff or recoupment;

14. Additional professional, consultant or inspection services required due to Contractor’s failure to comply with Contract Documents;

15. Liquidated damages payable to City;

16. Materials ordered or paid by City on behalf of Contractor;

17. Damage loss caused to City, a separate contractor, homeowner contractor or any other person or entity due to the actions of the Contractor;

18. Cleanup performed by City and chargeable to Contractor;

19. Failure of Contractor to pay contributions due and owing to employee benefits funds pursuant to applicable collective bargaining agreements or trust agreements;

20. Failure of Contractor or any Subcontractor to properly pay prevailing wages as defined in California Labor Code Section 1720 et/ seq.;

21. A breach by Contractor of any obligation or provision of the Contract Documents.

22. Whenever the City shall, in accordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefore shall be given the Contractor, and, when the Contractor shall remove the grounds for such withholding, the City will pay to the Contractor, within 35 calendar days, the amount so withheld.

Page 148 of 840 ends

GP-28
Application of Withholding
Sums properly withheld in good faith may be used by City without a prior judicial determination of City’s actual rights with respect to recovery of any Loss on which such withholding is based.

Contractor agrees and hereby designates City as its agent in for such purposes, and agrees that such payments shall be considered as payments made under the Construction Contract by City to Contractor. City shall submit to Contractor accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City may, in its sole discretion, elect to exercise its rights to adjust the Contract Sum.

Payment by City
After an Application for Progress Payment has been made, the City shall make payment in a timely manner unless there is a good faith reason for withholding the payments in accordance with the provisions of the Contract Documents or Applicable Law.

Payment to Subcontractors
Upon receipt of payment from City, Contractor shall pay the Subcontractors performing the Work, out of the amount paid to Contractor on account of such Subcontractor’s portion of the work, the amount of which said Subcontractor is entitled in accordance with the terms of its contract with Contractor and Applicable Laws, including, without limitation, California Public Contract Code Section 7107. Contractor shall remain responsible, notwithstanding a withholding by City pursuant to the terms of these General Conditions, to promptly satisfy from its own funds sums due to all Subcontractors who have performed the Work that is included in Contractor’s Application for Payment. Contractor shall, by appropriate agreement, require each Subcontractor to make payments to its sub-contractors and suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for payments to Subcontractors, of any Tier.

Direct Negotiation of Stop Notices
City shall have the right to directly discuss, negotiate, settle or pay, without notice to or participation by Contractor, any stop notice claims asserted by the Subcontractors, of any Tier, and to deduct such sums paid from sums due to Contractor.

Release of Stop Notices
Except to the extent of any payments that City fails to make to Contractor under circumstances that constitute a breach by City of its payment obligations under the Contract Documents, if any stop notice, whether invalid or valid, is made, filed with, served upon or asserted against City or a Homeowner by any of the Subcontractors, of any Tier, or their agent or employee, for money claimed due for Work of any kind provided, then Contractor shall within five (5) Days after written notice by City and at Contractor’s Own Expense, procure, furnish and record appropriate releases or other instruments which under Applicable Laws will full release, extinguish and removed such stop notice. Unless and until such stop notice is fully released as afore-stated, City shall have the right to retain from any payments then due, or thereafter to become due, an amount equal to one hundred and fifty percent (150%) of the amount necessary to satisfy, discharge and defend against any such stop notice and any action or proceeding thereon which may be brought to judgment or award. If the amount to be paid, or the amount retained thereon, is insufficient to satisfy, discharge

Page 149 of 840 ends

GP-29
or defend against such stop notice and any action of proceeding thereon, then Contractor shall be liable for the difference and upon written demand shall immediately deposit the same with City.

The provisions in this paragraph are in addition to such other rights as City may have against Contractor under the Contract Documents or Applicable Laws.

Failure of Payment by City
If, through no fault of Contractor or failure by Contractor to comply with its obligations under the Contract Documents, Payment is not issued within thirty (30) Days after receipt of an undisputed and properly prepared and submitted Application for Payment then Contractor may, upon fourteen (14) additional Days’ written notice to City, stop the Project Work for which such Application for Payment is received until payment is received as to any undisputed and owing work. Any resulting Delay associated with the shut down and start-up of the Project Work as a result of Contractor’s proper exercise of its rights under this paragraph shall constitute a Compensable Delay.

Disputed Payments, Continuous Work
No dispute or disagreement with respect to the amount of any payment claimed due by Contractor shall relieve or excuse Contractor from the obligation to proceed with and maintain continuous, expeditious and uninterrupted performance of the Work.

Completion. Inspection. Punch List. Re-Inspection
A Contractor-generated punch list must be provided to the City or its representative prior to the request for final inspection. It will be the discretion of the City or its representative to grant the final inspection based on the Contractor generated punch list. Contractor shall achieve Completion of the Project Work in accordance with the requirements of the Contract Time and other provisions of the Contract Documents. Contractor shall notify Engineer when Contractor believes that the Project Work for is Complete.

Unless the Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Compliance, the Engineer, accompanied by the Inspector of Record and any others deemed appropriate by the Engineer, will inspect the Project Work performed.

Contractor, along with such Subcontractors and others as Engineer deems necessary shall participate in the inspection. If the Project Work is found to be Complete, then Engineer shall proceed to issue a written completion notice as provided hereinafter.

Any items necessary for Compliance that are found missing, incomplete or requiring correction shall be summarized by Contractor in a Completion Punch List and promptly signed by Contractor and delivered to Engineer. Contractor shall proceed within forty-eight (48) hours after signing the Completion Punch List to commence correction and completion of the items listed.

Contractor shall notify Engineer when the items listed are completed at which time a re-inspection shall be scheduled in the same manner as the original inspection. If said inspection discloses any item, whether or not included on the original Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Completion shall be issued.

The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Compliance of the Project

Page 150 of 840 ends

GP-30
Work. A Notice of Completion shall be issued by the Engineer when he determines that Compliance of the Project Work has occurred.

Final Completion
Contractor shall expeditiously and diligently perform all items of Project Work on the Final Completion Punch List so as to achieve Final Completion of the Project Work within the requirements of the Contract Time for Final Completion of the Project Work. Contractor shall forward to Engineer a written notice when Contractor believes that it has completed all of the items on the Final Completion Punch List and is read for a Final Completion Inspection. Unless Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Final Completion, Engineer, accompanied by Inspector of Record and any others deemed appropriate by Engineer, will inspect Project Work performed. If the Project Work is found to be Finally Complete, then Engineer shall proceed to issue a Notice of Final Completion as provided hereinafter.

If said inspection discloses any item, whether or not included on the Final Completion Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Final Completion shall be issued. The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Final Compliance of the Project Work for any Home. A Notice of Final Completion shall be issued by the Engineer when he determines that Final Compliance of the Project Work has occurred.

Concluding Payment
Upon issuance by Engineer of the Notice of Final Completion for the Project Work Contractor shall submit to Engineer its Application for Payment requesting payment for completion. Without limitations to any other conditions to payment set forth elsewhere in the Contract Documents, the following shall be conditions precedent to a proper submission, and to Engineer’s approval, of Contractor’s Application for Final Payment:

1. Submission of an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Project Work for which City or City’s or Homeowner’s property or funds might be liable have been paid or otherwise satisfied;

2. Submission of consent of Surety, if any, to Completion Payment;

3. Submission of a certificate evidencing that the insurance required by the Contract Documents is in force;

4. Submission of conditional releases and waivers of stop notice and bond rights upon final payment in the form required by California Code Section 3262(d)(3) executed by Contractor and by all Subcontractors, of every Tier, performing any portion of the Project Work;

5. Submission of all Close-Out Documents for the Project Work;

Page 151 of 840 ends

GP-31

6. Submission of adequate and complete certified payroll records as required by the Contract Documents for any time period that Project Work was performed, which have not been submitted by Contractor in connection with its previous Applications for Payments.

7. Proper payment of prevailing wages as defined in California Labor Code Section 1720, et seq for the Project Work.

8. Submission of certificates by Contractor and each Subcontractor, as required by any applicable collective bargaining agreement or trust agreement or Applicable Laws, certifying that all employees’ benefits relating to the Project Work due and owing having been paid in full; and

9. Submission of any other documents or information required by the Contract Documents as a condition of Final Payment or Final Completion of the Project Work.

Final Payment Terminates Liability
No claim shall be made or be filed, and neither the City nor any of its officers or agents shall be liable or held to pay any money, except as specifically provided in the Contract Documents.

The acceptance by the Contractor of the final payment aforesaid shall operate as, and shall be, a release to the City and its agents, from all claim and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act or neglect of the City or of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided elsewhere in these General Conditions.

Securities in Lieu of Retention
Provisions of California Public Contract Code Section 22300 et. seq. substitution of eligible and equivalent securities for retention held by City to ensure Contractors performance under the Contract will be permitted at the request and expense of the Contractor and in conformity with California Section 22300. The foregoing notwithstanding, the Contractor shall have ten (10) days following action by the City to award the Agreement to the Contractor to submit its written request to the City to permit the substitution of securities for retention under California Public Contract Code Section 22300. The failure of such Contractor to make such a written request for the City within said ten (10) day period shall be deemed a waiver of the Contractor’s right under California Public Contract Code Section 22300.

In the event the Contractor wishes to choose to exercise its rights under California Public Contract Code Section 22300, the Contractor shall enter into an escrow agreement with the City, and the escrow agent, a state or federally chartered bank in California with a current A.M. Best Rating of not less than “A,” in the form specified by said Section 22300. Contractor shall have the obligation of ensuring that such securities deposited are sufficient to maintain it total fair market value an amount equal to the cash amount of the sums to be withheld under the Agreement. If upon written notice from the City or from the appropriate escrow agent, indicating that the fair market value of the securities has dropped below the dollar amount of monies to be withheld by the City to ensure performance, Contractor shall, within five (5) days of the date of such notice, post additional securities as necessary to ensure that the total fair market value of all such securities held by the

Page 152 of 840 ends

GP-32
City, or in escrow, is equivalent to the amount of money to be withheld by the City under the Agreement.

Any escrow agreement entered into shall contain the following provisions:
(a) The amount of surety to be deposited;
(b) The terms and conditions of conversion to cash in case of default of the Contractor; and
(c) The termination of the escrow upon completion of the contract.

7.3.3 Delivered Materials.

This subsection of the Standard Specifications is hereby replaced in its entirety by the following:

Materials and equipment delivered but not incorporated into the work will not be included in the estimate for progress partial payment.
7-3.5 Contract Unit Prices.
7-3.5.1 General.

Replace this subsection with the following:

If the Engineer orders a change in quantity of an item of Work, and the change does not involve a substantial change in character of the Work from that shown in the Plans or Specifications, the City will adjust the total payment to be made for the item of Work by multiplying the amount authorized and installed by the Contract Unit Price. This amount may be greater or less than the amount shown in the Bid.

If the total quantity of a Major Bid Item is changed, the quantity changes of the quantity shown in the Bid, either more or less, will be adjusted at the Contract Unit Price. 7-3.5.2 Increases of More than 25 Percent
This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.
7-3.5.3 Decreases of More than 25 Percent
This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.

Page 153 of 840 ends

GP-33
7-4 PAYMENT FOR EXTRA WORK.
7-4.3 Markup.

Replace this subsection with the following:
7-4.3.1 Work by Contractor.

The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit:

Labor 20%
Materials 15%
Equipment Rentals 15%
Other Contractor's costs 15%
One percent (1%) may also be added to the sum of costs and markups as compensation for the Contractor's bond premium.
7-4.3.2 Work by Subcontractor.

When a subcontractor performs all or any part of the extra work, the markups in paragraph (a) shall be added to the subcontractor's actual cost of such work. The Contractor may add an additional markup of 10% of the first $5,000 of the subcontracted portion of the extra work and 5% on work added in excess of $5,000 of the subcontracted portion of work.

SECTION 8 – FACILITIES FOR AGENCY PERSONNEL
The following is hereby added to this subsection of the Standard Specifications:

No field offices for AGENCY personnel will be required, however, the AGENCY personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the Contractor for the project in the City if so, provided by the Contractor for his own personnel.

SECTION 9 – CITY STANDARDS, STANDARD PLANS AND DRAWINGS Section 9 is hereby added to the Standard Specifications as follows:

All public improvements, construction and dedications required and described in this manual shall conform to the standards and specifications of the City. Standards, Standard Plans and Drawings of the following agencies are used by the City of Montebello and are part of the City’s standards.

Where there is ambiguity or conflict between standards over which standard shall apply, the City Engineer shall determine what shall apply, and his determination shall be final. All construction is subject to the approval of the City Engineer.

Standard Plans – Standard Plans for Public Works Construction, SPPWC, “Latest Edition and Supplement”.

Page 154 of 840 ends

GP-34
Los Angeles County Public Works Department – Grey Book and all plans except those modified or replaced by City Standards.

Los Angeles County Flood Control District - Applicable storm drains.

Sanitation Districts of Los Angeles County - Applicable sewer and manholes.

State of California – California Department of Transportation (Caltrans) Standard Specifications and Standard Plans - Pavement markings and traffic loops.

City Standards - All applicable standard plans.

Standard Specifications - The 2018 edition of, and applicable amendments to, the “Standard Specifications for Public Works Construction (SSPWC).”
California Manual on Traffic Control Devices (CA-MUTCD), “Latest Edition”.

SECTION 10 – CLAIMS AND PROTESTS
Section 10 is hereby added to the Standard Specifications as follows:

Excerpts from the Public Contract Code 9204.
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Claim” means a “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter

Page 155 of 840 ends

GP-35
county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.

Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.

Page 156 of 840 ends

GP-36
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.

Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.

Page 157 of 840 ends

GP-37
(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION
400-1 GENERAL.

The second paragraph of Subsection 400-1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall relocate, repair, replace or re-establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of the operations or as required by the Plans and Specifications. The Contractor shall make the effort to repair all sprinklers, pipe, etc by the end of the day.

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be considered as existing improvements, and the Contractor shall repaint or replace such improvements.

Relocations, repairs, replacements or re-establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 400-1 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation. 400-2 PERMANENT SURVEY MARKERS.

The following is added this subsection of the Standard Specifications:

The Contractor shall be responsible for the protection and preservation of existing permanent survey monuments and benchmarks during construction. Damaged or lost monuments and benchmarks shall be restored to existing condition by a Registered Civil Engineer or a Land Surveyor licensed by the State of California at no increase in cost to the City.

Page 158 of 840 ends

GP-38
The Contractor, at its own expense, shall employ a qualified surveyor to perform all survey work required for the completion of the project as specified in the plans and these specifications, comply with the requirements of Section 8771 of the Land Surveyors Act as amended and submit the documents from the County Surveyor as proof of compliance to the City of Montebello. 400-3 PAYMENT
This subsection of the Standard Specifications is hereby deleted and replaced with the following:

No separate or additional payment will be made for 1) protection of existing improvements, 2) restoration of existing improvements and 3) permanent survey markers. All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements shall be included in the bid.

SECTION 402 – UTILITIES
402-1 LOCATION.
402-1.1 General.

The following is hereby added to this subsection of the Standard Specifications:

The location and existence of any underground utility or substructure were obtained from a search of available records. No guarantee is made or implied that the information is complete or accurate.

It shall be the Contractor’s responsibility alone to determine the exact location of underground utilities or substructures of every nature and to protect them from damage. The Contractor shall excavate and expose all high-risk underground facilities. The Contractor shall notify the owners of all known utilities and substructures as set forth in the Specifications.

NOTIFICATION
The Contractor shall notify the City of Montebello and the owners of all utilities and substructures not less than 48 hours (2 working days) prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:

CITY OF MONTEBELLO DEPT OF PUBLIC WORKS (323) 887-1460
Attention: Mr. Cesar Roldan [email protected]
AT&T (626) 318-9039
Attention: Mr. Marco Macias
CALIFORNIA WATER SERVICE (323) 823-5287
Attention: Mr. Ralph Felix [email protected]
CENTRAL BASIN MUNICIPAL WATER DISTRICT (323) 201-5500
Attention: Mr. Alex Rojas

Page 159 of 840 ends

GP-39
CHARTER COMMUNICATION (626) 807-3263
Attention: Mr. Rodney Graf [email protected]
LOS ANGELES COUNTY DEPT. OF PUBLIC WORKS (626) 458-7136 Attention: Mr. Mahdad Derakhshani [email protected] LOS ANGELES COUNTY SANITATION DISTRICT (562) 908-4288 ext. 1205 Attention: Ms. Christine Gurga [email protected] METROPOLITAN WATER DISTRICT (213) 217-7670
Attention: Mr. Ken Chung [email protected]
MONTEBELLO LAND & WATER (323) 722-8654
Attention: Mr. Mario Gardea [email protected]
SAN GABRIEL VALLEY WATER CO. (909) 201-7349
Attention: Mr. Paul Garavito
SOUTH MONTEBELLO IRRIGATION DISTRICT (323) 721-4735
Attention: Mr. Jordan Betencourt [email protected] SOUTHERN CALIFORNIA EDISON North of Lincoln Av (323) 720-5298 Attention: Ms. Regina Gonzales
SOUTHERN CALIFORNIA EDISON North of Lincoln Ave. & Large Projects Attention: Ms. Elda Alatorre (323) 720-5214
SOUTHERN CALIFORNIA EDISON South of Lincoln Ave. (310) 608-5005 Attention: Ms. Lissette Alvarez [email protected] THE GAS COMPANY (310) 605-4105
Attention: Mr. Cesar Arroyo [email protected] CRMSON PIPELINE (310) 669-4002
Attention: Mr. Ryan Lassus (310) 669-4024
CHEVRON (310) 669-4014
Attention: Mr. Dave Zerler
CITY POLICE AND FIRE DEPARTMENT Police: (323) 887-1313
Fire: (323) 887-4510
UNDERGROUND SERVICE ALERT (800) 422-4133 Tel
(909) 808-8101 Fax
TRASH COLLECTORS – ATHENS DISPOSAL (626) 336-6100
STREET SWEEPING – NATIONWIDE (562) 860-0604

Page 160 of 840 ends

GP-40
MONTEBELLO UNIFIED SCHOOL DISTRICT (323) 887-7900
MONTEBELLO TRANSIT (323) 558-1625

EMERGENCY INFORMATION
The names, addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the City Police Department prior to beginning work.
402-1.2 Payment
Payment for provisions under section 402-1 of the Standard Specifications shall be considered included in the various items of the work. No separate payment will be authorized.

PART 6 – TEMPORARY TRAFFIC CONTROL
SECTION 600 – ACCESS
600-1 GENERAL.

The following is added to this subsection of the Standard Specifications:

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight hours (2 working days) prior to any temporary obstruction of access. 600-2 VEHICULAR ACCESS.

The following is added to this subsection of the Standard Specifications:

Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

In cases where driveways require replacement. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.
600-3 PEDESTRIAN ACCESS.

The following is added to this subsection of the Standard Specifications:

Page 161 of 840 ends

GP-41
Under situations of sidewalk closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the Agency.

SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND

MAINTENANCE WORK ZONES
601-1 GENERAL.

The following is added to this subsection of the Standard Specifications:

At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all arterial streets at all times except as permitted by the Engineer. With previous authorization from the City, the Contractor can provide one traffic lane in a single direction on residential streets, during construction hours.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

Street closures will not be allowed except as specifically permitted by the Engineer. 601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP)
601-2.1 General
The following is added to this subsection of the Standard Specifications:

At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed traffic control plan per section 601 of the Standard Specifications and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic control plan shall be approved in writing by the City Engineer prior to construction starts.

The plan shall be prepared per the latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Page 162 of 840 ends

GP-42
Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor and deduct same from the next progress payment.
601-2.2 Payment
Payment for provisions under section 601 of the Standard Specifications shall be considered included under the bid item for traffic control. No separate payment will be authorized.

Page 163 of 840 ends

BD-1

SPECIAL PROVISION
PART 2 – BID ITEM DESCRIPTIONS
FOR

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

IN THE CITY OF MONTEBELLO
All Bid Items shall be in accordance with the Standard Specifications for Public Works Construction (SSPWC), including supplements, State of California Department of Transportation (Caltrans) Standard Specifications, Latest Edition, and the Special Provisions and General Conditions of these specifications.

Bid Item No. 1 – Mobilization/Demobilization (Not to exceed 3% of total of all other Prime Contract Bid Items)
Mobilization shall conform to the provisions of Sections 7-3.4 of the Standard Specifications.

Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to and from the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials. Demobilization includes removal of all equipment and materials from the site, clean up and restoration of the work site at the end of project. This bid item shall also include pressure washing of all USA markings, clearing and grubbing operations preceding and post construction consisting of removing all natural and artificial objectionable materials from the Right-of-Way in construction areas, road approaches and material sites. Clearing and grubbing shall conform to the provision of section 300-1 of the standard specifications.

No additional amounts shall be paid for erosion control, Best Management Practices (BMP), erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil and other materials deposited on public streets by construction traffic.

Best Management Practices (BMP) shall be defined as any program, technology, process, citing criteria, operating method, measure, or device, which controls, prevents, removes, or reduces pollution. The Contractor shall obtain and refer to the California Storm Water Best Management

Page 164 of 840 ends

BD-2
Practice Handbooks, Volume 3, Construction BMP Handbook and the Los Angeles County Department of Public Works Best Management Practices Handbook for Construction Activities.

Los Angeles County Department of Public Works
Cashier’s Office
900 South Fremont Avenue
Alhambra, CA 91803
Telephone: 626-458-6959
The Contractor shall have a minimum of two readily accessible copies of each publication on the Contract site at all times plus any copies of applicable environmental mitigation plans.

Additional BMPs may be required as a result of a change in actual field conditions, contractor activities, or construction operation. When more than one BMP is listed under each specific BMP category, the Contractor shall select the appropriate and necessary number of BMPs within each category in order to achieve the BMP objective.

BMPs for Contractor activities shall be continuously implemented throughout the year and project time period. BMPs for erosion control and sedimentation shall be implemented during the period from October 15 to April 15, and whenever the National Weather Service Predicts rain within 24 hours. BMPs for erosion control and sedimentation shall also be implemented prior to the commencement of any Contractor activity or construction operation, which may produce run-off, and whenever run-off from other sources may occur.

The Agency (City), as a permittee thereto, is subject to enforcement actions by the State Water Resources Control Board, Environmental Protection Agency, and private citizens. The Agency will pass through to the Contractor any penalty assessed by these entities for each calendar day that the Contractor has not fully implemented the BMPs specified for the Contract and/or is otherwise in noncompliance with these provisions. In addition, the Agency will deduct, from the final payment due the Contractor, the total amount of any fines levied on the Agency, plus legal and staff costs, as a result of the Contractor’s lack of compliance with these provisions and/or less than complete implementation of the specified BMPs.

Payment for Mobilization/Demobilization shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work. Progress payments for this bid item shall be paid for in accordance with the completion percentage of the project to the Contractor and shall include the cost of such mobilization administration during the entire contract period and demobilization. No additional compensation will be allowed therefor. The sum total of this Bid Item shall not exceed 3% of the total of all other Bid Items.

Page 165 of 840 ends

BD-3
Bid Item No. 1 Through Bid Item 27 – Demolition Phase
All the Bid Items under the Demolition Phase of this project are included here. The specifications for each item are listed on the construction plans with the associated bid item numbers and bid type, and per all the relevant standard specifications of the agency’s standards cited herein.

Payment for Demolition Phase per Bid Items under this category will be paid per the Bid Schedule pricing, number of items dictated, and type and shall be considered full compensation for each item listed under the Demotion Phase, obtaining all approvals and permits, as required, from all related agencies, including, but not limited to, public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits, coordination,; and incidentals necessary to perform all related items of work.

Bid Item No. 1 Through Bid Item 38 – New Construction Phase All the Bid Items under the New Construction Phase of this project are included here.

Specifications for each item are listed on the construction plans with the associated bid item numbers and bid type, and per all the relevant standard specifications of the agency’s standards cited herein.

Payment for New Construction Phase per Bid Items under this category will be paid per the Bid Schedule pricing, number of items dictated, and type and shall be considered full compensation for each item listed under the New Construction Phase, obtaining all approvals and permits, as required, from all related agencies, including, but not limited to, public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits, coordination,; and incidentals necessary to perform all related items of work.

Page 166 of 840 ends

APPENDIX “A”

STANDARD PLANS

CITY OF MONTEBELLO

SENIOR CENTER BASEMENT REMODELING
C.P. No. 925

LIST OF STANDARD PLANS
Plan No. Description
Standard Plans for Public Works Construction:

SPPWC 110-2 Driveway Approaches
SPPWC 111-5 Curb Ramp
SPPWC 112-2 Curb and Sidewalk Joints
SPPWC 113-2 Sidewalk and Driveway Replacement
SPPWC 120-2 Curb and Gutter – Barrier
SPPWC 133-3 AC Pavement Replacement
SPPWC 150-3 Curb Drain
SPPWC 151-2 Parkway Drain
SPPWC 205-2 Sewer Manhole Adjustment
SPPWC 206-2 Manhole Raising Rings
SPPWC 520-4 Tree Planting
SPPWC 523-2 Root Pruning
SPPWC 606-4 Metal Hand Railings
SPPWC 622-4 Concrete Block Slough Wall
CALTRANS:

A20A, A20B, A20D Pavement Markers and Traffic Lines
A24A, A24D, A24E, A24F, A24G Pavement Markings, Arrows, Words, Limits & Crosswalk Lines
ES-5A, ES-5B Electrical Systems (Loop Detectors)

Page 167 of 840 ends

APPENDIX “B”

DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)

CONTRACTOR REGISTRATION NUMBER FORM
Beginning July 1, 2014, contractors must register with the Department of Industrial Relations (DIR) before bidding on public works contracts in California. For more information, please refer to this section of the Department of Industrial Relations Website:
http://www.dir.ca.gov/Public-Works/PublicWorks.html.

Per this requirement, provide the following information:
______________________________________________________________________ Contractor Name
Contractor Department of Industrial Relations Registration Number:
______________________________________________________________________ Expiration Date of Registration Number
*(THIS FORM MUST BE SUBMITTED WITH THE SEALED BID) *

Page 168 of 840 ends

APPENDIX “C”

PROJECT SIGN

PUBLIC IMPROVEMENT PROJECT SIGN
NOTES:
• Sign Size: 4 feet X 4 feet
• Sign Material: Anti-graffiti,
Diamond Grade
• Sign Color: Blue, Accent 1,
60% Lighter
• Lettering Color: Blue
• Border Color: Dark Blue

YOUR TAX DOLLARS AT WORK

SENIOR CENTER BASEMENT REMODEL
FY 2026/2027
CIP PROJECT NO.: 925

CITY OF MONTEBELLO CITY COUNCIL

GEORGINA TAMAYO - MAYOR
DANIELLE ROMERO – MAYOR PRO TEM
SCARLET PERALTA – COUNCILMEMBER
RIC ALONZO – COUNCILMEMBER
SALVADOR MELENDEZ – COUNCILMEMBER
CONSTRUCTION MANAGEMENT: ____________
CONTRACTOR: ______________________
START DATE: ___________ 2026
ESTIMATED COMPLETION DATE: _________ 2027

Page 169 of 840 ends

APPENDIX “D”
PROJECT LABOR AGREEMENT NO. 4202

Page 170 of 840 ends

AGREEMENT NO. 4202 – LOS ANGELES/ORANGE

COUNTIES BUILDING AND CONSTRUCTION

TRADES COUNCIL AND THE SIGNATORY CRAFT

COUNCILS AND UNIONS

Page 171 of 840 ends
Page 172 of 840 ends
Page 173 of 840 ends
Page 174 of 840 ends
Page 175 of 840 ends
Page 176 of 840 ends
Page 177 of 840 ends
Page 178 of 840 ends
Page 179 of 840 ends
Page 180 of 840 ends
Page 181 of 840 ends
Page 182 of 840 ends
Page 183 of 840 ends
Page 184 of 840 ends
Page 185 of 840 ends
Page 186 of 840 ends
Page 187 of 840 ends
Page 188 of 840 ends
Page 189 of 840 ends
Page 190 of 840 ends
Page 191 of 840 ends
Page 192 of 840 ends
Page 193 of 840 ends
Page 194 of 840 ends
Page 195 of 840 ends
Page 196 of 840 ends
Page 197 of 840 ends
Page 198 of 840 ends
Page 199 of 840 ends
Page 200 of 840 ends
Page 201 of 840 ends
Page 202 of 840 ends
Page 203 of 840 ends
Page 204 of 840 ends
Page 205 of 840 ends
Page 206 of 840 ends
Page 207 of 840 ends
Page 208 of 840 ends
Page 209 of 840 ends
Page 210 of 840 ends
Page 211 of 840 ends
Page 212 of 840 ends
Page 213 of 840 ends
Page 214 of 840 ends
Page 215 of 840 ends

Notice of Exemption Appendix E
Revised 2011
To: Office of Planning and Research
P.O. Box 3044, Room 113
Sacramento, CA 95812-3044
County Clerk
County of: __________________
___________________________
___________________________
From: (Public Agency): ____________________________
_______________________________________________
_______________________________________________
(Address)
Project Title: ____________________________________________________________________________ Project Applicant: ________________________________________________________________________ Project Location - Specific:

Project Location - City: ______________________ Project Location - County: _____________________ Description of Nature, Purpose and Beneficiaries of Project:

Name of Public Agency Approving Project: _____________________________________________________ Name of Person or Agency Carrying Out Project: ________________________________________________ Exempt Status: (check one):
 Ministerial (Sec. 21080(b)(1); 15268);
 Declared Emergency (Sec. 21080(b)(3); 15269(a));
 Emergency Project (Sec. 21080(b)(4); 15269(b)(c));
 Categorical Exemption. State type and section number: ____________________________________  Statutory Exemptions. State code number: ______________________________________________ Reasons why project is exempt:

Lead Agency
Contact Person: ____________________________ Area Code/Telephone/Extension: _______________ If filed by applicant:

1. Attach certified document of exemption finding.

2. Has a Notice of Exemption been filed by the public agency approving the project?  Yes  No Signature: ____________________________ Date: ______________ Title: _______________________  Signed by Lead Agency  Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code. Date Received for filing at OPR: _______________ Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.

Page 216 of 840 ends

ITEM # 8

CITY OF MONTEBELLO

CITY COUNCIL AGENDA STAFF REPORT
TO: Honorable Mayor and City Council Members
FROM: Raul Alvarez, City Manager

BY: John Soria, Director of Transportation
SUBJECT: BUS STOP IMPROVEMENT PROJECT (BSIP) – RECEIVE AND FILE

TECHNICAL MEMORANDUM AND PROJECT CANCELLATION DUE

TO FUNDING DEFICIT
DATE: August 26, 2026
RECOMMENDATIONS:

It is recommended that the City Council:

1. Receive and file the Bus Stop Improvement Project (BSIP) Final Technical Memorandum; and

2. Approve canceling the BSIP due to a $9.600 million funding deficit; and

3. Authorize the City Manager to re-evaluate the project scope, design standards, and procurement strategies for re-solicitation at a future date; and

4. Take such additional, related, action that may be desirable.

FISCAL IMPACT:

The recommended actions do not have a fiscal impact. The BSIP currently has a budgeted project amount of $2.700 million, with $2.570 million from federal funding sources and $143,000 from state and local funding sources. The Final Technical Memorandum (Attachment A) details that the total cost to complete the project is $12.300 million. Proceeding with the project will require an additional appropriation of $9.600 million, representing a more than 300% budget increase.

Currently, there are no unappropriated Transit funds available to absorb this $9.600 million shortfall. Funding this shortfall will require the City to deplete this amount from its Transit Reserve Fund or cancel other high-priority projects. Approving the recommendation to cancel the BSIP preserves Federal Transit Administration (FTA) Section 5307 funds allocated for this project. This action maintains fiscal stability, protects

Page 217 of 840 ends

CITY COUNCIL AGENDA REPORT - MEETING OF AUGUST 26, 2026

Page 2 of 3 ends

the City's Transit Enterprise Fund reserve thresholds, and preserves funding for other scheduled transit assets.

BACKGROUND/DISCUSSION:

On October 25, 2023, the City Council approved issuing a BSIP Consulting Services Request for Proposals (RFP) No. 24-7 (Attachment B). RFP No. 24-7 was developed to solicit qualified services from vendors who could provide an in-depth analysis of the entire Montebello Bus Lines (MBL) bus stop infrastructure. This entailed conducting a comprehensive survey and inventory of all bus stops, both within and beyond the City's jurisdiction, and provide design and amenity recommendations for possible bus stop improvements, including the costs associated with any improvements.

On February 28, 2024, the City Council approved awarding Professional Services Agreement No. 4180 (Attachment C) to Kimley-Horn and Associates, Inc. (Kimley-Horn) in the amount of $169,996 for the planning and design phase. The scope of work included conducting a bus stop inventory survey, drafting an existing conditions report, and discussing design and amenity recommendations with staff and the City Council. The project was originally envisioned with a construction budget of $2,713,000, utilizing FTA Section 5307 formula funds.

On March 26, 2026, Kimley-Horn concluded the design, inventory, and cost estimation phase with a final Technical Memorandum that detailed an estimated cost for construction and implementation of $12,307,000, a $9,600,000 variance over the programmed budget. Upgrading bus stop amenities and correcting ADA deficiencies were major contributing factors to the added overall project costs. Transportation staff reviewed the recommendations and identified areas to revise the recommended scope to reduce the costs. These discussions resulted in a reduced total estimated project cost of $8.000 million. However, the revised figure remained $5.300 million over the allocated $2.700 million budget.

A financial overview of the project’s funding versus estimated execution costs is outlined as follows:

Component Amount
Project Budget Target $2,700,000
Total Programmed Funds (FTA 5307 +
Local Match)
$2,713,000
Initial Consultant Construction Estimate $12,307,000
Cost after Staff Review (Revised Scope) $8,000,000
Remaining Project Funding Shortfall $5,300,000
While a $4.300 million cost reduction was achieved during multiple staff review discussions, covering the remaining $5.300 million deficit is not feasible within Transit

Page 218 of 840 ends

CITY COUNCIL AGENDA REPORT - MEETING OF AUGUST 26, 2026

Page 3 of 3 ends

Capital Program.

Kimley-Horn provided recommendations to deliver a phased project beginning with high priority stops (Attachment D) while allowing MOntebello Bus Lines (MBL) to continue pursuing additional competitive grant and funding opportunities. However, canceling the project at this stage allows the City to conclude current efforts without committing construction capital, creating the opportunity to re-start the design and procurement process from the ground up with a re-aligned scope and updated cost controls.

Furthermore, the existing data, GIS mapping, and bus stop inventory collected under Agreement No. 4180 remain City property and will serve as baseline data to inform the future design phase and subsequent procurement when re-initiated.

ENVIRONMENTAL:

N/A
ANALYSIS:

N/A
SUMMARY:

Staff recommend that the City Council receive and file the BSIP Final Technical Memorandum; approve canceling the BSIP due to a $9.600 million funding shortfall; authorize the City Manager to re-evaluate the project scope, design standards, and procurement strategies for re-solicitation at a future date; and take such additional, related, action that may be desirable.

ATTACHMENT(S)

1. Attachment A - Final Technical Memorandum

2. Attachment B - Request for Proposal (RFP) No. 24-7

3. Attachment C – Agreement No. 4180 with Kimley Horn & Assoc.

4. Attachment D - Recommended Phased Implementation

Page 219 of 840 ends

City of Montebello BSIP – Bus Stop Assessment and Improvement Technical Memo Page 1 Memorandum
To: Robert Fierro
City of Montebello – Montebello Bus Lines
From: John Jackson IV, AICP
Zander Dally, AICP
Matt Gibson, P.E.

Skylar Higgins
Kimley-Horn and Associates, Inc.

Date: March 26, 2026
Subject: Final - Bus Stop Assessment and Improvement Technical Memo

1.0 Introduction
The City of Montebello's (City) Montebello Bus Lines (MBL) is conducting the Bus Stop Improvement Project (BSIP or Project). This Project will enhance the efficiency, safety, and overall quality of the existing bus stop infrastructure within the city. The MBL FY 2023-2025 Short Range Transit Plan identified bus stop improvements as an area of priority under Capital Asset Projects (page 24). This Project could meet and exceed customer expectations by providing safe, clean, and reliable service, a goal of the FY 2023-2025 Short Range Transit Plan. This technical memo identifies the following:
• Cost estimates for bus stop location improvements for construction • Design factor checklist
• Cost estimates for existing infrastructure removal
• General and accessibility improvements
• Existing conditions of all MBL bus stops within and outside the City of Montebello’s jurisdiction. • Implementation of bus stop improvements within and outside of the City of Montebello’s jurisdiction

2.0 Future Bus Stop Improvements

2.1 General Improvements

2.1.1 Amenity Improvements
Bus Shelters
Bus shelters provide protection against natural elements and comfort while commuting. The bus shelter data collected during the inventory determined that 79 percent of the 823 total bus stops in the MBL system do not have bus shelters (the original existing conditions report stated 824 total stops due to a double count which has now been corrected).

Among the 256 bus shelters in MBL system, 49 are in Montebello. The new bus shelter designs will feature a cantilever steel frame with perforated metal panels, a backlit roof canopy, and options for backlit information panels and digital signage. The shelter designs include a custom bus bench with the Montebello “M” logo branding and a standalone trash receptable.

ATTACHMENT A

Page 220 of 840 ends

City of Montebello BSIP – Bus Stop Assessment and Improvement Technical Memo Page 2 Advertising
Digital advertising displays will be an optional addition to the new Montebello bus shelter designs. Shelter advertising is intended to capture the attention of pedestrians, bus riders, and drivers. Bus stop advertisements have high visibility, especially when placed in strategic locations, and create a revenue-generating opportunity for MBL. The funds generated from advertising can be reinvested to maintain infrastructure, offset operating costs, and keep fares lower.

Digital displays provide maximum flexibility for advertisement options and changes.

Real Time Information (RTI) and Next Bus
Real Time Information (RTI) displays at bus stops are a valuable amenity for improving customer experience. RTI systems use GPS trackers to monitor the exact locations of transit vehicles and contribute to the General Transit Specification Feed (GTFS), a standardized data format that tracks transit schedules and live activity. GTFS data provides “Next Bus” updates to transit riders digitally, like through the MyStop mobile app used by MBL riders, and physically on signs at bus stops. Next Bus countdowns at transit stops increase system legibility and accessibility.

Benches/Seating
Bus stop benches are a crucial amenity for customer experience and comfort at a bus stop. Table 1 details the seven bus bench types in the MBL system, as identified in the existing conditions assessment. Bus benches are present at 62 percent of stops in the MBL system. Upgraded bench design guidelines meet ADA requirements for seat and back support and allow for two people to sit comfortably. The design features a perforated surface supported by a crossbar structure that references the Montebello “M.”
Bus Stop Bench Type Number of Benches
Green Metal 2
Blue Metal 59
Blue with contract stands 1
Bench with dividers 42
Concrete standalone 0
Bench without dividers 4
Other (decorative designs) 405
No bench at stop 310
TOTAL 823
Table 1: Number of MBL Bus Stop Benches per Bench Type
Trash Receptacles
Trash receptacles help maintain cleanliness around bus stops and in public spaces. Trash receptacle types in the current MBL system include cement, metal/aluminum, pole mounted, or other miscellaneous types, and 38 percent of MBL stops have none present. Two new trash receptacle designs were developed – a trash receptacle integrated with the pole or a freestanding trash receptacle. The integrated trash receptacle is designed for stops with constrained sidewalk widths, with a slim profile and minimal weight mounted to the pole. The freestanding trash receptacle design features perforated panels and a structural support arm, separate from other bus stop amenities.

Lighting
Shelter lighting improves visibility, safety, and security around bus stops, especially in the evening and night hours.

The existing conditions assessment identified the proximity of lighting to MBL stops, finding that 815 bus stops have light fixtures present, but only 52 percent have lighting that is considered excellent or good quality. The design recommendation for premium bus stops includes LED lighting integrated into the bus shelter.

Page 221 of 840 ends

City of Montebello BSIP – Bus Stop Assessment and Improvement Technical Memo Page 3

2.1.2 Design Improvements
Design Concepts
Development of the design improvements began with researching case study designs, establishing design principles alongside MBL staff, and pulling inspiration from the history and architecture of the City of Montebello. Case studies included Omnitrans, LA Metro, Big Blue Bus, SF Muni, OCTA, and San Diego MTS. These agencies have different bus stop typologies and “kit of parts” designs that informed the development of the MBL basic, enhanced, and premium designs.

In October 2025, Kimley-Horn held a design workshop with MBL staff to understand key priorities for the new shelter concept. Comments and concerns from that workshop were incorporated into the following design principles:
maintenance, adaptability, climate resilience, security, branding and timelessness, accessibility, flexibility, and legibility.

Branding/Signage
Branding and timelessness were identified as key design principles for the recommendations. Designs should incorporate themes relevant to the City of Montebello but represent MBL in a way that transcends changes to city branding. The Montebello “M” is a recurrent motif in the bus amenity designs. Signage and designs should be legible and easily recognizable as MBL bus stops.

Figure 1: Montebello "M" Logo as Inspiration
Climate Resiliency
Bus shelters can utilize climate resilient design to provide protection from the sun and other extreme weather conditions while riders wait for the bus. About 75% of daylight hours in Montebello are sunny1 and the city has the lowest tree canopy coverage in all of Los Angeles County, only 13%2. Therefore, shade is a critical amenity for the city to provide.

The new shelter designs combat urban heat island effects with a solid sunshade canopy and perforated back and side panels that promote passive ventilation. The canopy also provides a shield from wind and rain, and the elevated cantilever frame allows for ground level water flow to prevent flooding. 1 Climate-data.org. “Climate: Montebello, California.” https://en.climate-data.org/north-america/united-states-ofamerica/california/montebello-15991/ 2 Center for Urban Resilience, TreePeople, and Gateway Cities Council of Governments, "City of Montebello Tree Canopy Prioritization" (2022). Center for Urban Resilience Reports. 10. https://digitalcommons.lmu.edu/cures_reports/10.

Page 222 of 840 ends