January 2023
D-15
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
I. Purpose:
II. Policy:
(17) Amount of This Payment: List the total amount paid to the DBE this period. (6) Total Contract Award Amount ($): Enter the total current contract award amount of the project.
Exhibit 9-F Instructions
Title 49 of the Code of Federal Regulations (CFR), Part 26.37(c) requires recipients of federal-aid funding to “provide a running tally of actual attainments, including a means of comparing these attainments to commitments.” This requirement does not apply to projects that do not have any federal funding.
A. To comply with 49 CFR 26.37(c), the prime contractors/consultants must complete the Exhibit 9-F: Disadvantaged Business Enterprise Running Tally of Payments and email it to [email protected] and their local administering agencies after submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 10th of the following month. Submission of this Exhibit is required until all DBE subcontracting or material supply activity on the entire project is completed.
B. Save this form using the following naming convention, [9 digit Federal Aid number]-[yyyymm]-[ss].xlsx. [yyyymm] is the reporting period. [ss] is two digit sequential numbering, applicable when consultant or contractor has more than one 9-F form to complete per pay period. For example, a valid saved file could read: 1234(567)-202207-01.xlsx.
III. Instructions:
(1) Reporting Period (mm-yyyy): Indicate the month and year of payments being reported. (2) Federal Aid Project Number: Enter the 7 digit federal-aid project number of the lead project on the contract. E.g. 5002(123) is a valid Federal-Aid Project Number.
(3) Caltrans District: Enter the appropriate Caltrans District number as 1 through 12. (4) Local Agency: List the local agency's name.
(5) Contract Number: List the local agency assigned contract agreement number. (16) Date of Payment: List current check date when a check is issued to the DBE for work performed by the DBE. (7) DBE Goal Percentage (%): Enter the contract DBE goal percentage as it appears on the project advertisement. (8) DBE Committed Percentage (%): Enter percentage of the Prime contract committed to DBE firms. (9) Business Name: List the name for the prime contractor/consultant as identified in Procedure 9 above. (10) Amount Prime's Invoice This Period ($): Enter the total invoice amount that prime submitted for reimbursement this period. (11) Amount Paid to Prime To Date ($): Enter the total payment that is paid to the Prime to date. (12) Prime certified DBE: Enter "Yes" if Prime Contractor/Consultant is certified DBE and "No" otherwise.
DBE Prime contractor needs to fill in from procedure (14) to (21) for payments to DBE Subcontractors and DBE Prime's self-performing.
Note: For Procedures (14) through (21) below, insert rows as needed to list all DBEs included on Exhibits 10-O2 or 15-G, and any other DBEs that were utilized regardless of tier.
(13) DBE Firm name: List the DBE's firm name.
(14) DBE Cert. Number: List the DBE's certification number as listed in the California Unified Certification Program (CUCP) database. (15) Contract Type: Select the most appropriate Subcontractor's contract type (Agent, Consultant, Joint Venture, Manufacturer, Prime, Regular Dealer, Subcontractor, Truck/Haul, Service Provider from dropdown list.) (24) Copy Distribution: The prime contractor/consultant will need to maintain a copy with the contract file (electronic and/or paper). The prime contractor/consultant will need to e-mail this form as provided in the Section II. Policy, paragraphs A as stated above. Local agency will need to keep a copy with the contract file.
(18) Amount Paid to Date: List the total amount paid to this DBE to date. This should be a total of past payments plus payment for the current work just invoiced to the Local Agency.
(19) Amount Committed to This DBE Firm: Copy the information from the agency signed Exhibit 10-O2 or 15-G. If the listed DBE was not originally committed to, type "0."
(20) Comments: Add appropriate notes if a DBE subcontract was terminated, a DBE subcontract was added, if change orders impacted the DBE's payments (include good faith efforts the prime contractor/consultant implemented), if task orders weren't issued, etc. (21) Prime Contractor/Consultant Manager's Name: Enter the manager's name of the prime contractor/consultant of the project. (22) Business Phone Number: Enter the manager's business phone number of the prime contractor/consultant. (23) Date: Provide the date this form was prepared.
D-16
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Exhibit 12-G
Required Federal-Aid Contract Language
Local Assistance Procedures Manual
October 2023
EXHIBIT 12-G: REQUIRED FEDERAL-AID CONTRACT LANGUAGE
(For Local Assistance Construction Projects)
The following language must be incorporated into all Local Assistance Federal-aid construction contracts.
The following language, with minor edits, was taken from the Code of Federal Regulations.
MAINTAIN RECORDS AND SUBMIT REPORTS DOCUMENTING YOUR PERFORMANCE UNDER THIS
SECTION
1. DISADVANTAGED BUSINESS ENTERPRISES (DBE) ..................................................................................... 2 A. Nondiscrimination Statement............................................................................................................... 3 B. Contract Assurance............................................................................................................................... 3 C. Prompt Progress Payment.................................................................................................................... 3 D. Prompt Payment of Withheld Funds to Subcontractors ................................................................... 3 E. Termination and Replacement of DBE Subcontractors..................................................................... 4 F. Commitment and Utilization ................................................................................................................. 6 G. Running Tally of Attainments............................................................................................................... 7 H. Commercially Useful Function............................................................................................................. 7 I. Use of Joint Checks.............................................................................................................................. 8
2. BID OPENING ...................................................................................................................................................... 9
3. BID RIGGING ....................................................................................................................................................... 9
4. CONTRACT AWARD........................................................................................................................................... 9
5. CONTRACTOR LICENSE.................................................................................................................................... 9
6. CHANGED CONDITIONS .................................................................................................................................... 9 A. Differing Site Conditions....................................................................................................................... 9 B. Suspensions of Work Ordered by the Engineer................................................................................. 9 C. Significant Changes in the Character of Work .................................................................................10
7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES........................................10
8. BUY AMERICA...................................................................................................................................................10
9. QUALITY ASSURANCE ....................................................................................................................................11
10. PROMPT PAYMENT..........................................................................................................................................12
11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS ..........................12
12. FEMALE AND MINORITY GOALS....................................................................................................................12
13. TITLE VI ASSURANCES....................................................................................................................................14
14. FEDERAL TRAINEE PROGRAM ......................................................................................................................19
15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND SERVICES..........................................................................................................................................................20 D-17
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
1. DISADVANTAGED BUSINESS ENTERPRISES (DBE)
The contractor, subrecipient or subcontractor shall take necessary and reasonable steps to ensure that DBEs have opportunity to participate in the contract (49 CFR 26). To ensure equal participation of DBEs provided in 49 CFR 26.5, the Agency shows a contract goal for DBEs. The prime contractor shall make work available to DBEs and select work parts consistent with available DBE subcontractors and suppliers.
The prime contractor shall meet the DBE goal shown elsewhere in these special provisions or demonstrate that they made adequate Good Faith Efforts (GFE) to meet this goal. An adequate GFE means that the bidder must show that it took all necessary and reasonable steps to achieve a DBE goal that, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to meet the DBE goal.
If the DBE goal is not met, the contractor needs to complete and submit the DBE GFE documentation as described in Local Assistance Procedures Manual (LAPM) Chapter 9, Section 9.8 within 5 (five) days of bid opening.
It is the prime contractor’s responsibility to verify that the DBE firm is certified as a DBE on the date of bid opening by using the California Unified Certification Program (CUCP) database and possesses the most specific available North American Industry Classification System (NAICS) codes and Work Code applicable to the type of work the firm will perform on the contract. Additionally, the prime contractor is responsible to document this verification by printing out the CUCP data for each DBE firm. A list of DBEs certified by the CUCP can be found at: https://dot.ca.gov/programs/civil-rights/dbe-search.
DBE participation will only count toward the California Department of Transportation’s federally mandated statewide overall DBE goal if the DBE performs a commercially useful function under 49 CFR 26.55.
Credit for materials or supplies the prime contractor purchases from DBEs counts towards the goal in the following manner:
• 100 percent counts if the materials or supplies are obtained from a DBE manufacturer. • 60 percent counts if the materials or supplies are obtained from a DBE regular dealer. • Only fees, commissions, and charges for assistance in the procurement and delivery of materials or supplies count if obtained from a DBE that is neither a manufacturer nor regular dealer. 49 CFR 26.55 defines "manufacturer" and "regular dealer."
The prime contractor receives credit towards the goal if they employ a DBE trucking company that performs a commercially useful function as defined in 49 CFR 26.55(d) as follows:
• The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals.
• The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the contract.
• The DBE receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs. • The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract. • The DBE may also lease trucks from a non-DBE firm, including from an owner-operator. The DBE that leases trucks equipped with drivers from a non-DBE is entitled to credit for the total value of transportation services provided by non-DBE leased trucks equipped with drivers not to exceed the value of transportation services on the contract provided by DBE-owned trucks or leased trucks with DBE employee drivers. Additional participation by non-DBE owned trucks equipped with drivers receives credit only for the fee or commission it receives as a result of the lease arrangement. • The DBE may lease trucks without drivers from a non-DBE truck leasing company. If the DBE leases trucks from a non-DBE truck leasing company and uses its own employees as drivers, it is entitled to credit for the total value of these hauling services.
D-18
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
• A lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the DBE, so long as the lease gives the DBE absolute priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE.
A. Nondiscrimination Statement
The contractor, subrecipient or subcontractor will never exclude any person from participation in, deny any person the benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR 26 on the basis of race, color, sex, or national origin. In administering the Local Agency components of the DBE Program Plan, the contractor, subrecipient or subcontractor will not, directly, or through contractual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE Program Plan with respect to individuals of a particular race, color, sex, or national origin.
B. Contract Assurance
Under 49 CFR 26.13(b): The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR 26 in the award and administration of federal-aid contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible.
C. Prompt Progress Payment
In accordance with California Business and Professions Code section 7108.5, the prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor’s interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made.
In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney’s fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and nonDBE subcontractors.
D. Prompt Payment of Withheld Funds to Subcontractors
The Agency may hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The Agency shall designate one of the methods below in the contract to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor. The Agency shall include either Method 1, Method 2, or Method 3 below and delete the other two.
Method 1: No retainage will be held by the Agency from progress payments due to the prime contractor.
Prime contractors and subcontractors are prohibited from holding retainage from subcontractors. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the D-19
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
Method 2: No retainage will be held by the Agency from progress payments due to the prime contractor.
Any retainage kept by the prime contractor or by a subcontractor must be paid in full to the earning subcontractor within seven (7) days after the subcontractor’s work is satisfactorily completed. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval.
Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
Method 3: The Agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency of the contract work and pay retainage to the prime contractor based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from all subcontractors within seven (7) days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the Agency. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor; deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
Any violation of these provisions of Prompt Progress Payment and Prompt Payment of Withheld Funds to Subcontractors shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified therein. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor.
E. Termination and Replacement of DBE Subcontractors
The prime contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains the Agency’s written consent. The prime contractor shall not terminate or replace a listed DBE for convenience and perform the work with their own forces or obtain materials from other sources without prior written authorization from the Agency. Unless the Agency’s prior written consent is provided, the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE on the Exhibit 15-G Construction Contract DBE Commitment form, included in the Bid.
Termination of DBE Subcontractors
After a contract with a specified DBE goal has been executed, termination of a DBE may be allowed for the following, but not limited to, justifiable reasons with prior written authorization from the Agency:
1. Listed DBE fails or refuses to execute a written contract based on plans and specifications for the project.
2. The Local Agency stipulated that a bond is a condition of executing the subcontract and the listed DBE fails to meet the Local Agency’s bond requirements.
3. Work requires a contractor's license and listed DBE does not have a valid license under Contractors License Law, or is not properly registered with the California Department of Industrial Relations as a public works contractor.
4. Listed DBE fails or refuses to perform the work or furnish the listed materials (failing or refusing to D-20
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
perform is not an allowable reason to remove a DBE if the failure or refusal is a result of bad faith or discrimination).
5. Listed DBE's work is unsatisfactory and not in compliance with the contract.
6. Listed DBE is ineligible to work on the project because of suspension or debarment.
7. Listed DBE becomes bankrupt or insolvent or exhibits credit unworthiness.
8. Listed DBE voluntarily withdraws with written notice from the Contract
9. Listed DBE is ineligible to receive credit for the type of work required.
10. Listed DBE owner dies or becomes disabled resulting in the inability to perform the work on the Contract.
11. The Agency determines other documented good cause.
To terminate a DBE or to terminate a portion of a DBE's work, the contractor must use the following procedures:
1. Send a written notice to the DBE of Contractor’s intent to use other forces or material sources and include one or more justifiable reasons listed above. Simultaneously send a copy of this written notice to the Agency. The written notice to the DBE must request they provide any response within five (5) business days to both the Contractor and the Agency by either acknowledging their agreement or documenting their reasoning as to why the use of other forces or sources of materials should not occur.
2. If the DBE does not respond within 5 business days, Contractor may move forward with the request as if the DBE had agreed to Contractor’s written notice.
3. Submit Contractor’s DBE termination request by written letter to the Agency and include:
• One or more above listed justifiable reasons along with supporting documentation. • Contractor’s written notice to the DBE regarding the request, including proof of transmission and tracking documentation of Contractor’s written notice
• The DBE's response to Contractor’s written notice, if received. If a written response was not provided, provide a statement to that effect.
The Agency shall respond in writing to Contractor’s DBE termination request within 5 business days.
Replacement of DBE Subcontractors
After receiving the Agency’s written authorization of DBE termination request, the Contractor must obtain the Agency’s written agreement for DBE replacement. The Contractor must find or demonstrate GFEs to find qualified DBE replacement firms to perform the work to the extent needed to meet the DBE commitment.
The following procedures shall be followed to request authorization to replace a DBE firm:
1. Submit a request to replace a DBE with other forces or material sources in writing to the Agency which must include:
a. Description of remaining uncommitted work items made available for replacement DBE solicitation and participation.
b. The proposed DBE replacement firm's business information, the work they have agreed to perform, and the following:
• Quote for bid item work and description of work to be performed • Proposed subcontract agreement and written confirmation of agreement to perform on the Contract
• Revised Subcontracting Request form
• Revised Exhibit 15-G: Construction Contract DBE Commitment
2. If Contractor has not identified a DBE replacement firm, submit documentation of the Contractor’s GFEs D-21
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
to use DBE replacement firms within 7 days of Agency's authorization to terminate the DBE. The Contractor may request the Agency's approval to extend this submittal period to a total of 14 days.
Submit documentation of actions taken to find a DBE replacement firm, such as:
• Search results of certified DBEs available to perform the original DBE work identified and/or other work the Contractor had intended to self-perform, to the extent needed to meet the DBE commitment
• Solicitations of DBEs for performance of work identified • Correspondence with interested DBEs that may have included contract details and requirements • Negotiation efforts with DBEs that reflect why an agreement was not reached • If a DBE's quote was rejected, provide Contractor’s reasoning for the rejection, such as why the DBE was unqualified for the work, or why the price quote was unreasonable or excessive • Copies of each DBE's and non-DBE's price quotes for work identified, as the Agency may contact the firms to verify solicitation efforts and determine if the DBE quotes are substantially higher • Additional documentation that supports the GFE
The Agency shall respond in writing to the Contractor’s DBE replacement request within five (5) business days.
The Contractor must submit a revised Subcontracting Request form if the replacement plan is authorized by the Agency.
F. Commitment and Utilization
The Agency’s DBE program must include a monitoring and enforcement mechanism to ensure that DBE commitments reconcile to DBE utilization.
The bidder shall complete and sign Exhibit 15-G: Construction Contract DBE Commitment included in the contract documents regardless of whether DBE participation is reported. The bidder shall provide written confirmation from each DBE that the DBE is participating in the Contract. LAPM Exhibit 9-I: DBE Confirmation or equivalent form and DBE’s quote must be submitted. The written confirmation must be submitted no later than 4pm on the 5th day after bid opening. If a DBE is participating as a joint venture partner, the bidder shall submit a copy of the joint venture agreement.
If the DBE Commitment form, Exhibit 15-G, is not submitted with the bid, it must be completed and submitted by all bidders to the Agency within five (5) days of bid opening. If the bidder does not submit the DBE Commitment form within the specified time, the Agency will find the bidder’s bid nonresponsive.
The prime contractor shall use each DBE subcontractor as listed on Exhibit 15-G: Construction Contract DBE Commitment unless they receive written authorization for a termination or replacement from the Agency.
The Agency shall request the prime contractor to:
1. Notify the Resident Engineer or Inspector of any changes to its anticipated DBE participation
2. Provide this notification before starting the affected work
3. Maintain records including:
• Name and business address of each 1st-tier subcontractor • Name and business address of each DBE subcontractor, DBE vendor, and DBEtrucking company, regardless of tier
• Date of payment and total amount paid to each DBE (see Exhibit 9-F: Monthly Disadvantaged Business Enterprise Payment)
If the prime contractor is a DBE contractor, they shall include the date of work performed by their own forces and the corresponding value of the work.
Before the 15th of each month, the prime contractor shall submit a Monthly DBE Trucking Verification (LAPM Exhibit 16-Z1) form.
D-22
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
If a DBE is decertified before completing its work, the DBE must notify the prime contractor in writing of the decertification date. If a business becomes a certified DBE before completing its work, the business must notify the prime contractor in writing of the certification date. The prime contractor shall submit the notifications. Upon work completion, the prime contractor shall complete a Disadvantaged Business Enterprises (DBE) Certification Status Change, Exhibit 17-O, form and submit the form within 30 days of contract acceptance.
Upon work completion, the prime contractor shall complete Exhibit 17-F: Final Report – Utilization of Disadvantaged Business Enterprises (DBE), First-Tier Subcontractors and submit it within 90 days of contract acceptance. The Agency will withhold $10,000 until the form is submitted. The Agency releases the withhold upon submission of the completed form.
G. Running Tally of Attainments
For projects awarded on or after March 1, 2020, but before September 1, 2023:
After submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 10th of the following month, the prime contractor/consultant must complete and email the Exhibit 9-F: Disadvantaged Business Enterprise Running Tally of Payments to [email protected] with a copy to local administering agencies.
For projects that are awarded on or after September 1, 2023:
Exhibit 9-F is no longer required. Instead, by the 15th of the month following the month of any payment(s), the prime contractor must now submit Exhibit 9-P to the Local Agency administering the contract. If the Contractor does not make any payments to subcontractors, supplier(s) and/or manufacturers they must report “no payments were made to subs this month” and write this visibly and legibly on Exhibit 9-P.
H. Commercially Useful Function
DBEs must perform a commercially useful function (CUF) under 49 CFR 26.55 when performing work or supplying materials listed on the DBE Commitment form. The DBE value of work will only count toward the DBE commitment if the DBE performs a CUF. A DBE performs a CUF when it is responsible for execution of the work on the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. If a DBE does not perform or exercise responsibility for at least 30% of the total cost of its contract with its own work force, or the DBE subcontracts a greater portion of the work of a contract than would be expected on the basis of normal industry practice for the type of work involved, it will be presumed that the DBE is not performing a CUF. Additionally, the DBE must also be responsible, with respect to materials and supplies used on the contract, for negotiating price, determining quality and quantity, ordering the material and installing (where applicable), and paying for the material itself.
The Contractor must perform CUF evaluation for each DBE company working on a federal-aid contract, with or without a DBE goal. Perform a CUF evaluation at the beginning of the DBE’s work, and continue to monitor the performance of CUF for the duration of the project.
The Contractor must provide written notification to the AGENCY at least 15 days in advance of each DBE's initial performance of work or supplying materials for the Contract. The notification must include the DBE's name, work the DBE will perform on the contract, and the location, date, and time of where their work will take place.
Within 10 (ten) days of a DBE initially performing work or supplying materials on the contract, the Contractor shall submit to the LPA the initial evaluation and validation of DBE performance of a CUF using the LAPM 9-J:
Disadvantaged Business Enterprise Commercially Useful Function Evaluation. Include the following information with the submittal:
• Subcontract agreement with the DBE
• Purchase orders
• Bills of lading
• Invoices
• Proof of payment
D-23
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
The Contractor must monitor all DBE’s performance of CUF by conducting quarterly evaluations and validations throughout their duration of work on the contract using the LAPM 9-J: DBE Commercially Useful Function Evaluation. The Contractor must submit to the AGENCY these quarterly evaluations and validations by the 5th of the month for the previous three (3) months of work.
The Contractor must notify the AGENCY immediately if the Contractor believes the DBE may not be performing a CUF.
The AGENCY will verify DBEs performance of CUF by reviewing the initial and quarterly submissions of LAPM 9-J: DBE Commercially Useful Function Evaluation, submitted supporting information, field observations, and through any additional AGENCY evaluations. The AGENCY must evaluate DBEs and their CUF performance throughout the duration of a Contract. The AGENCY will provide written notice to Contractor and DBE at least two (2) business days prior to any evaluation. The Contractor and DBE must participate in the evaluation. Upon completing the evaluation, the AGENCY must share the evaluation results with the Contractor and DBE. An evaluation could include items that must be remedied upon receipt. If the AGENCY determines the DBE is not performing a CUF the Contractor must suspend performance of the noncompliant work.
The Contractor and DBEs must submit any additional CUF related records and documents within five (5) business days of AGENCY’s request such as:
• Proof of ownership or lease and rental agreements for equipment • Tax records
• Employee rosters
• Certified payroll records
• Inventory rosters
Failure to submit required DBE Commercially Useful Function Evaluation forms or requested records and documents can result in withholding of payment for the value of work completed by the DBE.
If the Contractor and/or the AGENCY determine that a listed DBE is not performing a CUF in performance of their DBE committed work, immediately suspend performance of the noncompliant portion of the work. The AGENCY may deny payment for the noncompliant portion of the work. The AGENCY will ask the Contractor to submit a corrective action plan (CAP) to the AGENCY within five (5) days of the noncompliant CUF determination. The CAP must identify how the Contractor will correct the noncompliance findings for the remaining portion of the DBE's work. The AGENCY has five (5) days to review the CAP in conjunction with the prime contractor’s review. The Contractor must implement the CAP within five (5) days of the AGENCY's approval. The AGENCY will then authorize the prior noncompliant portion of work for the DBE's committed work.
If corrective actions cannot be accomplished to ensure the DBE performs a CUF on the Contract, then the Contractor may have good cause to request termination of the DBE.
I. Use of Joint Checks
A joint check may be used between the Contractor or lower-tier subcontractor and a DBE subcontractor purchasing materials from a material supplier if the contractor obtains prior approval from the LPA for the proposed use of joint check upon submittal of the LAPM 9-K: DLA Disadvantaged Business Enterprises (DBE) Joint Check Agreement Request form.
To use a joint check, the following conditions must be met:
• All parties, including the Contractor, must agree to the use of a joint check • Entity issuing the joint check acts solely to guarantee payment • DBE must release the check to the material supplier
• LPA must authorize the request before implementation
• Any party to the agreement must provide requested documentation within 10 days of the LPA's request for the documentation
• Agreement to use a joint check must be short-term, not to exceed 1 year, allowing sufficient time needed to establish or increase a credit line with the material supplier D-24
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
A request for a joint check agreement may be initiated by any party. If a joint check is used, the DBE remains responsible for all elements of 49 CFR 26.55(c)(1).
Failure to comply with the above requirements disqualifies DBE participation and results in no credit and no payment to the Contractor for DBE participation.
A joint check may not be used between the Contractor or subcontractor and a DBE regular dealer, bulk material supplier, manufacturer, wholesaler, broker, trucker, packager, manufacturer’s representative, or other persons who arrange or expedite transactions.
2. BID OPENING
The Agency publicly opens and reads bids at the time and place shown on the Notice to Contractors.
3. BID RIGGING
The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424- 9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.
4. CONTRACT AWARD
If the Agency awards the contract, the award is made to the lowest responsible and responsive bidder.
5. CONTRACTOR LICENSE
The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (23 CFR 635.110).
6. CHANGED CONDITIONS
A. Differing Site Conditions
1. During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.
2. Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.
3. No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice.
4. No contract adjustment will be allowed under this clause for any effects caused on unchanged work. [This provision may be omitted by the Local Agency, at their option.] B. Suspensions of Work Ordered by the Engineer
1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.
2. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted.
D-25
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
3. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.
4. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract.
C. Significant Changes in the Character of Work
1. The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.
2. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair andequitable.
3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract.
4. The term “significant change” shall be construed to apply only to the following circumstances:
• When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or
• When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.
7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES The Contractor shall begin work within 15 calendar days after the issuance of the Notice to Proceed.
This work shall be diligently prosecuted to completion before the expiration of WORKING DAYS beginning on the fifteenth calendar day after the date shown on the Notice to Proceed.
The Contractor shall pay to the City/County the sum of $ per day, for each and every calendar days’ delay in finishing the work in excess of the number of working days prescribed above.
8. BUY AMERICA
Buy America Requirements apply to steel and iron, manufactured products, and construction materials permanently incorporated into the project.
Steel and Iron Materials
All steel and iron materials must be melted and manufactured in the United States except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)];
2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total contract amount or $2,500, materials produced outside the United States may be used if authorized.
Furnish steel and iron materials to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured. All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
D-26
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
Manufactured Products
Iron and steel used in precast concrete manufactured products must meet the requirements of the above section (Steel and Iron Materials) regardless of the amount used. Iron and steel used in other manufactured products must meet the requirements of the above section (Steel and Iron Materials) if the weight of steel and iron components constitute 90 percent or more of the total weight of the manufactured product.
Construction Materials
Buy America requirements apply to the following construction materials that are or consist primarily of:
1. Non-ferrous metals
2. Plastic and polymer-based products such as:
2.1 Polyvinylchloride
2.2 Composite Building Materials
3. Glass
4. Fiber optic cable (including drop cable)
5. Optical fiber
6. Lumber
7. Engineered wood
8. Drywall
All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.
Where one or more of these construction materials have been combined by a manufacturer with other materials through a manufacturing process, Buy America requirements do not apply unless otherwise specified.
Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to Buy America compliance.
All manufacturing processes for these materials must occur in the United States.
Buy America requirements do not apply to the following:
1. Tools and construction equipment used in performing the work
2. Temporary work that is not incorporated into the finished project Waivers
If Buy America waivers are granted, use the following language to include in the contract:
The following steel and iron products, manufactured products, or construction materials have received an approved Buy America waiver for this contract, and therefore, are not subject to Buy America requirements:
1. _______________________________
2. _______________________________
9. QUALITY ASSURANCE
The Local Agency uses a Quality Assurance Program (QAP) to ensure a material is produced to comply with the Contract. The Local Agency may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP.
D-27
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
10. PROMPT PAYMENT
A. FROM THE AGENCY TO THE CONTRACTORS
The Local Agency shall make all project progress payment within 30 days after receipt of an undisputed and properly submitted payment request from the Contractor on a construction contract. If the Local Agency fails to pay promptly, the Local Agency shall pay interest to the Contractor, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied and pro-rated as necessary. Upon receipt of the payment request, the Local Agency shall act in accordance with both of the following:
1. The Local Agency shall review each payment request as soon as feasible after receipt to verify it is a proper payment request.
2. The Local Agency must return any payment request deemed improper by the Local Agency to the Contractor as soon as feasible, but not later than seven (7) days, after receipt. A request returned pursuant to this paragraph shall include documentation setting forth in writing the reasons why it is an improper payment request.
B. SUBMITTAL OF EXHIBIT 9-P
For projects awarded on or after September 1, 2023:
The Contractor must submit Exhibit 9-P to the Local Agency administering the contract by the 15th of the month following the month of any payment(s). If the Contractor does not make any payments to subcontractors, supplier(s) and/or manufacturers they must report “no payments were made to subs this month” and write this visibly and legibly on Exhibit 9-P.
The Local Agency must verify all Exhibit 9-P information, monitor compliance with prompt payment requirements for DBE and non-DBE firms, and address any shortfall to the DBE commitment and prompt payment issues until the end of the project. The Local Agency must email a copy of Exhibit 9-P to [email protected] before the end of the month after receiving the Exhibit 9-P from the Contractor.
11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS [Form FHWA-1273 must be physically inserted into the contract without modification, excluding ATTACHMENT
A - EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS.]
[The current version of Form FHWA-1273 is accessible at FHWA’s website:
https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf]
12. FEMALE AND MINORITY GOALS
To comply with Section II, "Nondiscrimination," of "Required Contract Provisions Federal-Aid Construction Contracts," the following are for female and minority utilization goals for Federal-aid construction contracts and subcontracts that exceed $10,000:
The nationwide goal for female utilization is 6.9 percent.
The goals for minority utilization (45 Fed Reg 65984 (10/3/1980)) are as follows:
D-28
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
MINORITY UTILIZATION GOALS
Economic
Area
Goal
(Percent)
174 Redding CA:
Non-SMSA (Standard Metropolitan Statistical Area) Counties:
CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama
6.8 175
Eureka, CA
Non-SMSA Counties:
CA Del Norte; CA Humboldt; CA Trinity
6.6 San Francisco-Oakland-San Jose, CA:
28.9 25.6
19.6 14.9
9.1 17.1
23.2 SMSA Counties:
7120 Salinas-Seaside-Monterey, CA
CA Monterey
7360 San Francisco-Oakland
CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo 7400 San Jose, CA
176 CA Santa Clara, CA
7485 Santa Cruz, CA
CA Santa Cruz
7500 Santa Rosa
CA Sonoma
8720 Vallejo-Fairfield-Napa, CA
CA Napa; CA Solano
Non-SMSA Counties:
CA Lake; CA Mendocino; CA San Benito
177
Sacramento, CA:
SMSA Counties:
6920 Sacramento, CA
CA Placer; CA Sacramento; CA
Yolo Non-SMSA Counties
CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba
16.1 14.3
Stockton-Modesto, CA:
SMSA Counties:
5170 Modesto, CA 12.3
178 CA Stanislaus
8120 Stockton, CA 24.3
CA San Joaquin
Non-SMSA Counties 19.8
CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne Fresno-Bakersfield, CA
SMSA Counties:
179 0680 Bakersfield, CA 19.1
CA Kern
2840 Fresno, CA
CA Fresno
Non-SMSA Counties:
CA Kings; CA Madera; CA Tulare
26.1 23.6
D-29
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
Los Angeles, CA:
11.9 28.3
21.5 19.0
19.7 24.6
SMSA Counties:
0360 Anaheim-Santa Ana-Garden Grove, CA
CA Orange
4480 Los Angeles-Long Beach, CA
CA Los Angeles
180 6000 Oxnard-Simi Valley-Ventura, CA
CA Ventura
6780 Riverside-San Bernardino-Ontario, CA
CA Riverside; CA San Bernardino
7480 Santa Barbara-Santa Maria-Lompoc, CA
CA Santa Barbara
Non-SMSA Counties
CA Inyo; CA Mono; CA San Luis Obispo
San Diego, CA:
16.9 18.2
SMSA Counties
181 7320 San Diego, CA
CA San Diego
Non-SMSA Counties
CA Imperial
For the last full week of July during which work is performed under the contract, the prime contractor and each non material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 (Appendix C to 23 CFR 230). Submit the forms by August 15.
13. TITLE VI ASSURANCES
[The U.S. Department of Transportation Order No.1050.2A requires all federal-aid Department of Transportation contracts between an agency and a contractor to contain Appendix A and E.
Note: Appendix B only requires inclusion if the contract impacts deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein. Appendices C and D only require inclusion if the contract impacts deeds, licenses, leases, permits, or similar instruments entered into by the recipient.]
APPENDIX A
During the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as CONTRACTOR) agrees as follows:
a. Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement. b. Nondiscrimination: CONTRACTOR, with regard to the work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations. c. Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for work to be performed under a Sub- agreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR’S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.
d. Information and Reports: CONTRACTOR shall provide all information and reports required by the D-30
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the recipient or FHWA to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the recipient or FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information. e. Sanctions for Noncompliance: In the event of CONTRACTOR’s noncompliance with the nondiscrimination provisions of this agreement, the recipient shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
i. withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or
ii. cancellation, termination or suspension of the Agreement, in whole or in part. f. Incorporation of Provisions: CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.
CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the recipient or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a subapplicant or supplier as a result of such direction, CONTRACTOR may request the recipient enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States.
APPENDIX B
CLAUSES FOR DEEDS TRANSFERRING UNITED STATES PROPERTY
The following clauses will be included in deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein from the United States pursuant to the provisions of Assurance 4:
NOW THEREFORE, the U.S. Department of Transportation as authorized by law and upon the condition that the recipient will accept title to the lands and maintain the project constructed thereon in accordance with Title 23 U.S.C., the regulations for the administration of the preceding statute, and the policies and procedures prescribed by the FHWA of the U.S. Department of Transportation in accordance and in compliance with all requirements imposed by Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252; 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the recipient all the right, title and interest of the U.S. Department of Transportation in and to said lands described in Exhibit A attached hereto and made a part hereof.
(HABENDUM CLAUSE)
TO HAVE AND TO HOLD said lands and interests therein unto the recipient and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein contained as follows, which will remain in effect for the period during which the real property or structures are used for a purpose for which Federal financial assistance is extended or for another purpose involving the provision of similar services or benefits and will be binding on the recipient, its successors and assigns. The recipient, in consideration of the conveyance of said lands and interest in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors and assigns, that (1) no person will on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility located wholly or in part on, over, or under such lands hereby conveyed [,] [and]* (2) that the recipient will use the lands and interests in lands and interest in lands so conveyed, in compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation, Effectuation of Title D-31
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
VI of the Civil Rights Act of 1964, and as said Regulations and Acts may be amended[, and (3) that in the event of breach of any of the above-mentioned non-discrimination conditions, the Department will have a right to enter or re-enter said lands and facilities on said lands, and that above described land and facilities will thereon revert to and vest in and become the absolute property of the U.S. Department of Transportation and its assigns as such interest existed prior to this instruction].* (*Reverter clause and related language to be used only when it is determined that such a clause is necessary in order to make clear the purpose of Title VI.)
APPENDIX C
CLAUSES FOR TRANSFER OF REAL PROPERTY ACQUIRED OR IMPROVED UNDER THE
ACTIVITY, FACILITY, OR PROGRAM
The following clauses will be included in deeds, licenses, leases, permits, or similar instruments entered into by the recipient pursuant to the provisions of Assurance 7(a):
A. The (grantee, lessee, permittee, etc. as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree [in the case of deeds and leases add “as a covenant running with the land”] that:
1. In the event facilities are constructed, maintained, or otherwise operated on the property described in this (deed, license, lease, permit, etc.) for a purpose for which a U.S. Department of Transportation activity, facility, or program is extended or for another purpose involving the provision of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) will maintain and operate such facilities and services in compliance with all requirements imposed by the Acts and Regulations (as may be amended) such that no person on the grounds of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities.
B. With respect to licenses, leases, permits, etc., in the event of breach of any of the above Nondiscrimination covenants, the recipient will have the right to terminate the (lease, license, permit, etc.) and to enter, re-enter, and repossess said lands and facilities thereon, and hold the same as if the (lease, license, permit, etc.) had never been made or issued.*
C. With respect to a deed, in the event of breach of any of the above Non-discrimination covenants, the recipient will have the right to enter or re-enter the lands and facilities thereon, and the above described lands and facilities will there upon revert to and vest in and become the absolute property of the recipient and its assigns.*
(*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.)
D-32
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
APPENDIX D
CLAUSES FOR CONSTRUCTION/USE/ACCESS TO REAL PROPERTY ACQUIRED UNDER THE
ACTIVITY, FACILITY OR PROGRAM
The following clauses will be included in deeds, licenses, permits, or similar instruments/agreements entered into by the recipient pursuant to the provisions of Assurance 7(b):
A. The (grantee, licensee, permittee, etc., as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest ,and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add, “as a covenant running with the land”) that (1) no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that in the construction of any improvements on, over, or under such land, and the furnishings of services thereon, no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits or, or otherwise be subjected to discrimination, (3) that the (grantee, licensee, lessee, permittee, etc.) will use the premises in compliance with all other requirements imposed by or pursuant to the Acts and Regulations, as amended, set forth in this Assurance.
B. With respect to (licenses, leases, permits, etc.) in the event of breach of any of the above of the above Non-discrimination covenants, the recipient will have the right to terminate the (license, permits, etc., as appropriate) and to enter or re-enter and repossess said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) had never been made or issued.* C. With respect to deeds, in the event of breach of any of the above Non-discrimination covenants, the recipient will there upon revert to and vest in and become the absolute property of the recipient and its assigns.
(*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.)
APPENDIX E
During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees to comply with the following non-discrimination statutes and authorities, including, but not limited to:
Pertinent Non-Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);
• Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), prohibits discrimination on the basis of sex; • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CR Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), prohibits discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such D-33
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination of the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 – 12189) as implemented by Department of Transportation regulations 49 C.F.R. parts 37 and 38;
• The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and LowIncome Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
D-34
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
Federal Trainee Program Special Provisions
(to be used when applicable)
14. FEDERAL TRAINEE PROGRAM
For the Federal training program, the number of trainees or apprentices is .
This section applies if a number of trainees or apprentices is shown on the Notice of Bidders.
As part of the prime contractor’s equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved.
The prime contractor has primary responsibility for meeting this training requirement.
If the prime contractor subcontracts a contract part, they shall determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in each subcontract.
Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training.
Distribute the number of apprentices or trainees among the work classifications on the basis of the prime contractor’s needs and the availability of journeymen in the various classifications within a reasonable recruitment area.
Before starting work, the prime contractor shall submit to the City/County of :
1. Number of apprentices or trainees to be trained for each classification
2. Training program to be used
3. Training starting date for each classification
The prime contractor shall obtain the City/County of approval for this submitted information before the prime contractor starts work. The City/County of credits the prime contractor for each apprentice or trainee the prime contractor employs on the job who is currently enrolled or becomes enrolled in an approved program.
The primary objective of this section is to train and upgrade minorities and women toward journeyman status.
The prime contractor shall make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area and show that they have made the efforts. In making these efforts, the prime contractor shall not discriminate against any applicant for training.
The prime contractor shall not employ as an apprentice or trainee an employee:
1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman
2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training
The prime contractor shall ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. The prime contractor’s records must show the employee's answers to the questions.
In the training program, the prime contractor shall establish the minimum length and training type for each classification. The City/County of and FHWA approves a program if one of the following is met:
1. It is calculated to:
• Meet the equal employment opportunity responsibilities • Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period
2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federal-aid highway construction contracts
D-35
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
The prime contractor shall obtain the State's approval for their training program before they start work involving the classification covered by the program.
The prime contractor shall provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is allowed in lower-level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training.
The City/County of reimburses the prime contractor 80 cents per hour of training given an employee on thiscontract under an approved training program:
1. For on-site training
2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project and prime contractor does at least one of the following:
a. Contribute to the cost of the training
b. Provide the instruction to the apprentice or trainee c. Pay the apprentice's or trainee's wages during the off-site training period
3. If the prime contractor complies with this section.
Each apprentice or trainee must:
1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill
2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program Furnish the apprentice or trainee a:
1. Copy of the training plan approved by the U.S, Department of Labor or a training plan for trainees approved by both Caltrans and FHWA
2. Certification showing the type and length of training satisfactorily completed Maintain records and submit reports documenting contractor’s performance under this section.
15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND
SERVICES
In response to significant national security concerns, the agency shall check the prohibited vendor list before making any telecommunications and video surveillance purchase because recipients and subrecipients of federal funds are prohibited from obligating or expending loan or grant funds to:
• Procure or obtain;
• Extend or renew a contract to procure or obtain; or
• Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
The prohibited vendors (and their subsidiaries or affiliates) are:
• Huawei Technologies Company;
• ZTE Corporation;
• Hytera Communications Corporation;
• Hangzhou Hikvision Digital Technology Company;
• Dahua Technology Company; and
• Subsidiaries or affiliates of the above-mentioned companies.
D-36
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
October 2023
In implementing the prohibition, the agency administering loan, grant, or subsidy programs shall prioritize available funding and technical support to assist affected businesses, institutions and organizations as is reasonably necessary for those affected entities to transition from covered communications equipment and services, to procure replacement equipment and services, and to ensure that communications service to users and customers is sustained.
The contractors should furnish telecommunications and video surveillance equipment with a certificate of compliance. The certificate must state telecommunications and video surveillance equipment was not procured or obtained from manufacturers identified in the above list.
D-37
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 17-F
Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors Exhibit 17-F: Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors
1. Local Agency Contract Number 2. Federal-Aid Project Number 3. Local Agency 4. Contract Acceptance Date
5. Contractor/Consultant 6. Business Address 7. Final Contract Amount
8. Contract
Item
Number
9. Description of Work, Service, or
Materials Supplied
10. Company Name and
Business Address
11. DBE
Certification
Number
12. Contract Payments 13. Date
Work
Completed
14. Date of
Final
Non Payment -DBE DBE
15. ORIGINAL DBE COMMITMENT AMOUNT $ 16. TOTAL
List all first-tier subcontractors/subconsultants and DBEs regardless of tier whether or not the firms were originally listed for goal credit. If actual DBE utilization (or item of work) was different than that approved at the time of award, provide comments on an additional page. List actual amount paid to each entity. If no subcontractors/subconsultants were used on the contract, indicate on the form.
I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT
17. Contractor/Consultant Representative’s Signature 18. Contractor/Consultant Representative’s Name 19. Phone 20. Date
I CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE DBE(S) HAVE BEEN MONITORED
21. Local Agency Representative’s Signature 22. Local Agency Representative’s Name 23. Phone 24. Date DISTRIBUTION: Original – Local Agency, Copy – Caltrans District Local Assistance Engineer. Include with Final Report of Expenditures
D-38
January 2023
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 17-F
Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors
INSTRUCTIONS – FINAL REPORT-UTILIZATION OF DISADVANTAGED BUSINESS ENTERPRISES (DBE) AND
FIRST-TIER SUBCONTRACTORS
1. Local Agency Contract Number - Enter the Local Agency contract number or identifier.
2. Federal-Aid Project Number - Enter the Federal-Aid Project Number.
3. Local Agency - Enter the name of the local or regional agency that is funding the contract.
4. Contract Acceptance Date - Enter the date the contract was accepted by the Local Agency.
5. Contractor/Consultant - Enter the contractor/consultant’s firm name.
6. Business Address - Enter the contractor/consultant’s business address.
7. Final Contract Amount - Enter the total final amount for the contract.
8. Contract Item Number - Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts.
9. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials provided. Indicate all work to be performed by DBEs including work performed by the prime contractor/consultant’s own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.
10. Company Name and Business Address - Enter the name, address, and phone number of all subcontracted contractors/consultants. Also, enter the prime contractor/consultant’s name and phone number, if the prime is a DBE.
11. DBE Certification Number - Enter the DBE’s Certification Identification Number. Leave blank if subcontractor is not a DBE.
12. Contract Payments - Enter the subcontracted dollar amount of the work performed or service provided.
Include the prime contractor/consultant if the prime is a DBE. If the materials or supplies are obtained from a DBE manufacturer, count 100% of the cost of the materials or supplies toward DBE goals. If the materials or supplies are purchased from a DBE regular dealer/supplier, count 60% of the cost of the materials or supplies toward DBE goals. The Non-DBE column is used to enter the dollar value of work performed by firms that are not certified DBE or for work after a DBE becomes decertified.
13. Date Work Completed - Enter the date the subcontractor/subconsultant’s item work was completed.
14. Date of Final Payment - Enter the date when the prime contractor/consultant made the final payment to the subcontractor/subconsultant for the portion of work listed as being completed.
15. Original DBE Commitment Amount - Enter the “Total Claimed DBE Participation Dollars” from Exhibits 15-G or 10-O2 for the contract.
16. Total - Enter the sum of the “Contract Payments” Non-DBE and DBE columns.
17. Contractor/Consultant Representative’s Signature - The person completing the form on behalf of the contractor/consultant’s firm must sign their name.
18. Contractor/Consultant Representative’s Name - Enter the name of the person preparing and signing the form.
19. Phone - Enter the area code and telephone number of the person signing the form.
20. Date - Enter the date the form is signed by the contractor’s preparer.
21. Local Agency Representative’s Signature - A Local Agency Representative must sign their name to certify that the contracting records and on-site performance of the DBE(s) has been monitored.
22. Local Agency Representative’s Name - Enter the name of the Local Agency Representative signing the form.
23. Phone - Enter the area code and telephone number of the person signing the form.
24. Date - Enter the date the form is signed by the Local Agency Representative.
D-39
January 2023
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
I I I
I I
I I I
I I I
Local Assistance Procedures Manual Exhibit 17-O
Disadvantaged Business Enterprises (DBE) Certification Status Change EXHIBIT 17-O DISADVANTAGED BUSINESS ENTERPRISES (DBE) CERTIFICATION STATUS CHANGE
1. Local Agency Contract Number 2. Federal-Aid Project Number 3. Local Agency 4. Contract Completion Date
5. Contractor/Consultant 6. Business Address 7. Final Contract Amount
8. Contract
Item
Number
9. DBE Contact Information
10. DBE
Certification
Number
11. Amount Paid
While Certified
12. Certification/
Decertification
Date
(Letter Attached)
13. Comments
If there were no changes in the DBE certification of subcontractors/subconsultants, indicate on the form.
I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT
14. Contractor/Consultant Representative’s Signature 15. Contractor/Consultant Representative’s Name 16. Phone 17. Date
I CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE DBE(S) HAS BEEN MONITORED
18. Local Agency Representative’s Signature 19. Local Agency Representative’s Name 20. Phone 21. Date DISTRIBUTION: Original – Local Agency, Copy – Caltrans District Local Assistance Engineer. Include with Final Report of Expenditures ADA NOTICE: For individuals with sensory disabilities, this document is available in alternate formats. For information, call (916) 445-1233, Local Assistance Procedures Manual TTY 711, or write to Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
D-40
July 23, 2015
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Local Assistance Procedures Manual Exhibit 17-O
Disadvantaged Business Enterprises (DBE) Certification Status Change INSTRUCTIONS –DISADVANTAGED BUSINESS ENTERPRISES (DBE)
CERTIFICATION STATUS CHANGE
1. Local Agency Contract Number - Enter the Local Agency contract number or identifier.
2. Federal-Aid Project Number - Enter the Federal-Aid Project Number.
3. Local Agency - Enter the name of the local or regional agency that is funding the contract.
4. Contract Completion Date - Enter the date the contract was completed.
5. Contractor/Consultant - Enter the contractor/consultant’s firm name.
6. Business Address - Enter the contractor/consultant’s business address.
7. Final Contract Amount - Enter the total final amount for the contract.
8. Contract Item Number - Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts.
9. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors/consultants.
10. DBE Certification Number - Enter the DBE’s Certification Identification Number.
11. Amount Paid While Certified - Enter the actual dollar value of the work performed by those subcontractors/subconsultants during the time period they are certified as a DBE.
12. Certification/Decertification Date (Letter Attached) - Enter either the date of the Decertification Letter sent out by the Office of Business and Economic Opportunity (OBEO) or the date of the Certification Certificate mailed out by OBEO.
13. Comments - If needed, provide any additional information in this section regarding any of the above certification status changes.
14. Contractor/Consultant Representative’s Signature - The person completing the form on behalf of the contractor/consultant’s firm must sign their name.
15. Contractor/Consultant Representative’s Name - Enter the name of the person preparing and signing the form.
16. Phone - Enter the area code and telephone number of the person signing the form.
17. Date - Enter the date the form is signed by the contractor’s preparer.
18. Local Agency Representative’s Signature - A Local Agency Representative must sign their name to certify
that the contracting records and on-site performance of the DBE(s) has been monitored.
19. Local Agency Representative’s Name - Enter the name of the Local Agency Representative signing the form.
20. Phone - Enter the area code and telephone number of the person signing the form.
21. Date - Enter the date the form is signed by the Local Agency Representative.
July 23, 2015
D-41
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 8 – Prosecution and Progress (02/24)
Federal Aid Project
8-1
8 PROSECUTION AND PROGRESS
Section 8-1.04, START OF JOB SITE ACTIVITIES
Section 8-1.04B, "Standard Start," replace with the following:
The Contractor must not enter upon the site of the work or begin operations until he has submitted to the City in proper form all contract, surety bonds, evidences of insurance and all other documents required of him in connection with the contract and all such documents have been approved by the City. Written notice of approval must be issued by the City of Mountain House Department of Public Works.
The working days must begin on May 5, 2025, contingent upon prior receipt of notice to proceed. If the notice is not received before the specified date, working days must begin on the first working day of the week following the date of the notice of approval.
The beginning of working days may be rescheduled by mutual agreement between the City and the Contractor by written correspondence.
Section 8-1.05, "Time," replace the first and second paragraphs with the following:
The Contractor must complete all work before the expiration of June 25, 2025 (35) working days.
Section 8-1.10A, “General” add the following:
If the completion of the project is delayed beyond the time specified herein, and the delay is not excused under paragraph 16 of the construction agreement, Contractor shall pay to the City the sum of $2,000 per day for each calendar day in liquidated damages during which completion of the project is delayed beyond the time specified for completion.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 9 ñ Payment (02/24)
Federal Aid Project
9-1
9 PAYMENT
Section 9-1.02, MEASUREMENT
Section 9-1.02C, "Final Pay Item Quantities," add the following:
Pay quantities to be submitted by the Contractor and approved by the City prior to processing a progress payment.
Section 9-1.03, "PAYMENT SCOPE," add the following:
The prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractorís interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made. In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorneyís fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and non-DBE subcontractors.
Section 9-1.06, ìChanged Quantity Payment Adjustments,î delete.
Section 9-1.07, "Payment Adjustment for Price Index Fluctuations," delete.
Section 9-1.16A, "General," replace paragraph two with the following:
The Engineer's Monthly Estimate Period will begin on the first working day of the month.
Payment must be due the month following the Engineerís Monthly Estimate Period. All contracted work and any additional work approved by the City of Mountain House shall be measured and paid per the unit prices of each items listed in the bid schedule(s).
Section 9-1.16F, "Retentions," replace with the following:
No retainage will be held by the Department from progress payments due to the prime contractor.
Prime contractors and subcontractors are prohibited from holding retainage from subcontractors.
Any delay or postponement of payment may take place only for good cause and with the Departmentís prior written approval.
Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code.
This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 10 ñ General (02/24)
Federal Aid Project
10-1
10 GENERAL
Section 10-1.02, WORK SEQUENCING
Section 10-1.02B, "Traffic Elements," add before paragraph 1:
When the work includes the installation of underlying conduits or loop detectors, do not place the uppermost layer of new pavement until all underlying conduits and loop detectors are installed.
Section 10-1.02E, "Excavation", add before paragraph 1:
Excavation within 6 feet of the existing traveled way must not precede the paving operation by more than 5 working days unless:
1. Authorized
2. Material is placed and compacted against the vertical cuts within 2 horizontal feet of the existing traveled way. (During excavation operations, native material may be used for this purpose except once the placement of the structural section starts, structural material must be used to replace the native material. Place the material up to the top of the existing pavement and taper at a slope of 4:1 (horizontal : vertical) or flatter to the bottom of the excavation. Do not use treated base for the taper.
At the end of each working day, if a difference in excess of 1 foot exists between the elevation of the existing pavement and the elevation of an excavation within 2 feet of the traveled way, place and compact material against the vertical cut adjacent to the traveled way. (During the excavation operation, you may use native material for this purpose except once the placing of the structural section starts, structural material must be used to replace the native material. Place the material up to the top of the existing pavement and taper at a slope of 4:1 (horizontal : vertical) or flatter to the bottom of the excavation. Do not use treated base for the taper.
Section 10-3, replace Reserved with:
10-3.01 ìEthernet Switchî
Ethernet Switch shall conform to Section S86-5.03 of the latest edition of the City of Mountain House (City) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Ethernet Switch as shown on the project plans. Install Eight Port Managed Ethernet Switch with Power over Ethernet.
Contractor shall coordinate with the City for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Full compensation for furnishing and installing Ethernet Switch shall be considered as included in the contract bid price paid for "Furnish and Install 8-Fort Ethernet Switch with Power Ethernet" and no additional compensation will be allowed therefor. 10-3.02 Fiber Optic Cable
Fiber Optic Cable shall conform to Section S86-5.03 of the latest edition of the City of Mountain House (City) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 10 ñ General (02/24)
Federal Aid Project
10-2
Furnish and install Fiber Optic Cable as shown on the project plans.
Full compensation for furnishing and installing Fiber Optic Cable shall be considered as included in the contract bid price paid for "Fiber Optic Cable" and no additional compensation will be allowed therefor.
10-3.03 Wireless Radio System
Wireless Radio System shall conform to Section S86-5.03 of the latest edition of the City of Mountain House (City) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Encom Wireless Broadband Radio System as shown on the project plans, or approved equal as determined by the City. The traffic signal locations are along Mountain House Parkway at the locations below.
• Arnaudo Blvd.
• Mustang Way
• Grant Line Road
• Von Sosten Road
Wireless Radio System shall include antenna and wire cable from the traffic signal mast arm to the controller cabinet as shown on the project plans.
Furnish and install Encom Wireless Broadband Radio System at the Town Hall as shown on the project plans. Furnish and install Encom Wireless Broadband Radio System or approved equal as determined by the City. Full Compensation for furnishing and installing Wireless Radio System at Town Hall shall be considered as included in the contract bid price paid for "Wireless Radio System at Town Hall" and no additional compensation will be allowed therefor.
The Contractor shall furnish and install radio antenna on existing steel pole including mounting for antenna and pole, and radio antenna wire through existing conduit in the building from the rooftop to the IT Server Room at the Town Hall. The mounting shall be compatible with the radio antenna and shall be similar to the existing mountings on the existing steel pole. The work shall be considered as included in the contract bid price paid for ìWireless Radio System at Town Hallî and no additional compensation will be allowed therefor. The Contractor shall submit mounting for antenna and pole for City of Mountain House approval. The Contractor shall not begin work for Wireless Radio System at Town Hall without City of Mountain House approval.
The Contractor shall coordinate with the City for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Wireless Radio System components shall meet the requirements specified below in this Section 10-3.03.
Ethernet Port
• 10/100/1000BaseTX
IEEE Compliance
• 802.1s/802.1w - STP/RSTP
• 802.3i -10BaseTX
• 802.3u -100BaseTX
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 10 ñ General (02/24)
Federal Aid Project
10-3
• 802.3ab - Gigabit Ethernet
• 802.3ad - Link Aggregation / Port Bonding / Port Tracking • 802.1d - Ethernet Bridging
• 802.1p/802.11e - Traffic Prioritization / WMM and QOS • 802.1q - VLAN Tagging
• 802.11h - DFS and TPC
• 802.3af/at - Power over Ethernet
• 802.1ad - Service Tags
• 802.3x - Full Duplex and Flow Control
• VPN Compatible
Wireless Requirements
• Broadband 5.8 GHz (Unlicensed)
• 802.11 AC Compliant
• Channel Widths - 5Mhz, 10Mhz, 20Mhz, 40Mhz and 80Mhz
• Modulation - Orthogonal Frequency-Division Multiplexing (OFDM) • Transmit Power - 30 dBm
• Range - up to 60 miles based on antenna selection
• E-max protocol
• Dynamic Frequency Selection
Security Features
• 802.11i with AES-CCM Encryption
• 802.1x Authentication
• 802.11i - WPA2
• Radius Authentication compatible
• MAC Authentication
Network Management
• SSL
• SNMP
Antenna
The radio assemblies shall be furnished with a high gain, flat panel type, sector or dish antenna suitable for the application or as specified on the plans. Antenna use will be determined by distance between radios, line of sight conditions and network architecture. Prior to installation, the Contractor shall submit his proposed antenna layout to the Engineer for approval. Typical antenna arrangements shall be include:
• Single Radio - one integrated high gain flat panel antenna. • Dual Radio - one integrated high gain flat panel antenna and coax parts for dual polarity external antenna.
The panel antenna shall be weatherproof and have the same ingress protection rating as the radio enclosure.
Radio Enclosure
The radio shall be mounted within a cast aluminum or similar enclosure that meets the following requirements:
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 10 ñ General (02/24)
Federal Aid Project
10-4
• Maximum Dimensions : 13" L x 13" W x 4" D
• Maximum Weight: 5 lbs
• Ingress Protection (IP) 67 weatherproof rating
• Operating Temperature Range: -40ºF to + 175ºF
• Humidity (non-condensing): 5% to 95%
• Integrated IP67 vent
• Industrial, weatherproof 10/100/1000 BaseTX Ethernet connector • A high visibility RSSI, power indicator with a reset button must be available on the enclosure
• Female Type N antenna connectors for external antenna connections as required. The external radio shall have two Type N connectors.
Power Requirements
Power Over Ethernet
The radio units shall support Power over Ethernet (POE). A POE supply injector shall be provided with each radio. Typically, this injector will be located in the local equipment/controller cabinet and shall meet the following requirements:
• Input Voltage: 100 to 240 VAC
• Output Voltage: 0.6A @ 53 VDC
• An additional PoE port on the radio should be available by request to meet 802.3af requirements with a maximum 13W power draw
• The injector shall have suitable lightning and surge protection integral to the unit Power Consumption
• Single Radio - 0.6A, 17W max @ 53 VDC
• Dual Radio - 0.8A max, 19W max @ 53 VDC
Integrated GPS, Antenna Feed-line and Connectors
• All coaxial cable connectors shall be EIA compliant UG1168 Utilizing captive pin technology
• All external antenna connections shall be made utilizing cold shrink tubing or butyl • weatherproof tape sealed with 2" electrical tape in order to provide a weathertight seal at the connector
Full compensation for furnishing and installing Wireless Radio System shall be considered as included in the contract bid price paid for "Wireless Radio System" and no additional compensation will be allowed therefor.
10-3.04 Tactics Computer Software
Contractor shall furnish and install TACTICS computer software on the computer in the IT server room. The computer software for signal coordination shall be Siemens ATMS platform TACTICS software. The TACTICS software shall be compatible with SEPAC firmware in the City of Mountain House traffic signal controllers.
Tactics Supplier/Vendor shall provide the standard Tactics Service Package including training and manuals. Tactics package shall include access from workstations for 5 workstations, training, and training materials at no additional cost to the City.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 10 ñ General (02/24)
Federal Aid Project
10-5
Full compensation for furnishing and installing Tactics Software shall be considered as included in the contract bid price paid for "Wireless Radio System at "Town Hall" and no additional compensation will be allowed therefor.
10-3.05 Existing Traffic Signal Controller
Traffic Signal Controller shall conform to Section S86-5.03 of the latest edition of the City of Mountain House (City) Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
The existing Traffic Signal Controller shall remain as shown in the project plans.
Contractor shall coordinate with the City for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Full compensation for "Existing Traffic Signal Controller" shall be considered as included in the prices paid for various items of work involved and no additional compensation will be allowed therefor.
10-3.06 Fiber Distribution Unit
Fiber Distribution Unit shall conform ìFiber Optic Termination Panelsî in Section S86-5.03 of the latest edition of the City of Mountain House (City) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Fiber Distribution Unit as shown on the project plans.
Contractor shall coordinate with the City for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Full compensation for furnishing and installing "Fiber Distribution Unit" shall be considered as included in the contract bid price paid for "Fiber Distribution Unit" and no additional compensation will be allowed therefor.
Section 10-4 ìWater Usageî, replace item 4 of paragraph 3 with:
4. Dust palliative for dust control requires preapproval by the Engineer.
Section 10-5 Dust Controlî, replace item 1 of paragraph 2 with:
1. Applying non-potable water under Section 10-6, ìWatering,î of the Standard Specifications and these Special Provisions.
Section 10-5 ìDust Controlî, add after paragraph 2:
No separate payment will be made for any work performed or materials used to control dust resulting from the Contractor's operations either inside or outside the right-of-way, or for controlling dust caused by public traffic during Contractor's working hours. Full compensation for such dust control will be considered as included in the prices paid for the various items of work involved and no additional compensation will be allowed therefor.
When the Engineer orders the application of water for the purpose of controlling dust caused by public traffic during non-working hours after the Contractor has shut down operations for overnight, for a weekend, for a holiday or for temporary suspension of work, in accordance with Section 8-1.06, ìSuspensions,î of the Standard Specifications, such work will be paid for at the contract unit price for Dust Control (Non-working Hours).
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 10 ñ General (02/24)
Federal Aid Project
10-6
Payment quantity of Dust Control (Non-working Hours) must be measured and paid for as follows:
After working hours......................1 each Dust Control (Non-working Hours) per day Saturday or non-working day...... 2 each Dust Control (Non-working Hours) per day Sunday or Holiday....................... 3 each Dust Control (Non-working Hours) per day No adjustment of compensation will be made for the unit item of Dust Control (Non-working Hours) for any increase or decrease in the hours of work or the quantity of water required, regardless of the reason for such increase or decrease. 10-6 Watering, replace sentence 1 of paragraph 3 with:
Water for dust control on this project must be non-potable.
If non-potable water is unavailable, use of potable water for dust control is permissible with the approval of the Engineer. When non-potable water is permissible, it must either be recycled water or non-potable water developed from other sources. Contractor must obtain a permit for potable water usage and pay all applicable fees from City of Mountain House Public Works Department or to any other outside agency for obtaining their potable water.
Provide written notification to the Engineer of the intended source(s) to be used, prior to starting work on the project.
10-6 Watering, add after paragraph 11:
When the contract does not include a contract pay item for Develop Water Supply, full compensation for Develop Water Supply must be considered as included in the contract prices paid for the various items of work involved.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 11 ñ Quality Control and Assurance (02/24)
Federal Aid Project
11-1
11 QUALITY CONTROL AND ASSURANCE
No alterations have been performed. Refer to Section 11, ìQuality Control and Assuranceî in Standard Specifications.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 12B ñ Temporary Traffic Control (02/24)
Federal Aid Project
SP-1
12 TEMPORARY TRAFFIC CONTROL
The following subsections refer to Section 12-1, "General." Section 12-1.01, ìGeneral,î add the following:
The Contractor must submit a construction area Traffic Control Plan for approval by the City Engineer two weeks before the commencement of any work. Traffic Control Systems and construction area traffic control devices shall be in accordance with the current Caltrans ìManual of Traffic Controlsî and supplemented by the current ìWork Area Traffic Control Handbook.î The traffic control system for lane closure shall be in accordance with Standard Plans T-11 and T-12.
Section 12-4.02C, "Conventional Highway Lane Requirement Chart," replace ìReservedî with the following:
A minimum of one paved traffic lane, not less than 11 feet wide, must be open for use by public traffic at all times. When construction operations are not actively in progress, not less than two such lanes must be open to public traffic.
On roadways with 2 or more traffic lanes in each direction, the Contractor must so conduct his operations that one paved traffic lane in each direction will be open at all times.
Under one-way reversing traffic control operations, public traffic may be stopped in one direction for periods not to exceed 10 minutes. After each stoppage, all accumulated traffic for that direction must pass through the work zone before another stoppage is made.
On roads with medians, the contractors may direct the traffic to one side with proper notice, delineation, signage, and traffic control. If a complete road closure is required due to emergencies and the traffic needs to be redirected, appropriate detour signs shall be installed, as prepared by the Traffic Engineer and approved by the Engineer, to have the traffic flow without approaching the construction site.
Section 12-4.01A, General, add the following after paragraph 1:
Section 12-4 includes specifications for closing traffic lanes with stationary and moving lane closures on 2-lane, 2-way roadways. The traffic control system for a lane closure must comply with the standard plans.
Traffic control system includes traffic control plan, signs, notices, delineators, barricades, changeable message sign, flagging and any additional equipment used to notify or direct traffic.
Section 12-4.01C, "Construction", replace ìNot Usedî with the following:
12-4.01C(1), "General"
Whenever components of the traffic control system are displaced or cease to operate or function as specified from any cause, immediately repair the components to the original condition or replace the components and restore the components to the original location. 12-4.01C(2), , "Stationary Lane Closures"
For a stationary lane closure made only for the work period, remove components of the traffic control system from the traveled way and sidewalk, except for portable delineators placed along open trenches or excavation adjacent to the traveled way at the end of each work period.
For multilane lane closures, each vehicle used to place, maintain, and remove components of a traffic control system on a multilane roadway must be equipped with a Type II Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 12B ñ Temporary Traffic Control (02/24)
Federal Aid Project
SP-2
flashing arrow sign that must be in operation whenever the vehicle is being used for placing, maintaining, or removing the components. Vehicles equipped with a Type II flashing arrow sign not involved in placing, maintaining or removing the components if operated within a stationarytype lane closure must only display the caution display mode. The sign must be controllable by the operator of the vehicle while the vehicle is in motion. If a flashing arrow sign is required for a lane closure, the flashing arrow sign must be operational before the lane closure is in place.
Section 12-4.02C(9)(d), "Payment", Replace ìNot Usedî with the following:
Traffic control system for lane closure is paid for as ìTraffic Control Systemî by lump sum in the Bid List Item.
The requirements in section 4-1.05 for payment adjustment do not apply to traffic control system. Adjustments in compensation for traffic control system will be made for an increase or decrease in traffic control work if ordered and will be made on the basis of the cost of the necessary increased or decreased traffic control. The adjustment will be made on the Traffic Control account basis for increased work and estimated on the same basis in the case of decreased work.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 13 ñ Water Pollution Control (02/24)
Federal Aid Project
SP-3
13 WATER POLLUTION CONTROL
The following subsections refer to Section 13-1, "General." Section 13-1.01A, "Summary," add the following:
This project is anticipated to disturb less than one acre of soil.
Section 13-1.01B, "Definitions," add the following:
Department: When used in reference to manuals and General Permits, Department must mean City of Mountain House Department of Public Works.
Section 13-3.01A, "Summary," replace paragraph 1 with the following:
Section 13-3 includes specification for developing, implementing and registering a SWPPP for projects disturbing one or more acres.
Section 13-3.01C(2)(a), "General," replace paragraph 1 with the following:
Contractor must implement measures to prevent erosion, debris and sediment laden runoff from entering the creek or storm drain system. These measures shall be discussed and approved by the Engineer prior to commencing construction. At minimum, the construction site shall be isolated by properly installing straw wattles and any nearby catch basins shall be protected by fabricated and/or sand/gravel bags. If any material enters the creek or the street area, it will be the responsibility of the contractor to clean and restore the area to its original condition.
Section 13-4.04, "Payment," replace with the following:
When the contract does not include a contract pay item for Water Pollution Control, full compensation for Water Pollution Control must be considered as included in the prices paid for the various contract items of work and no separate payment will be made therefor.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Section 14 ñ Environmental Stewardship (02/24)
Federal Aid Project
SP-4
14 ENVIRONMENTAL STEWARDSHIP
Section 14-10.02, "Solid Waste Disposal and Recycling Report," delete.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Appendices
A. Construction PLANS
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
TITLE SHEET & LOCATION MAP
N/A
TM-1.0
1 INDEX OF SHEETS
DWG No. SHEET No. DESCRIPTION
TM-1 1 TITLE SHEET, LOCATION MAP & OVERVIEW MAP
GN-1 2 TOWN HALL & GENERAL PROJECT NOTES
SM-1.0 3 BYRON ROAD & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION SM-2.0 4 GRAND AVENUE & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION SM-3.0 5 MAIN STREET & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION SM-4.0 6 ARNAUDO BLVD & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION SM-5.0 7 MUSTANG WAY & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION SM-6.0 8 GRANT LINE ROAD & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION SM-6.1 9 GRANT LINE ROAD & MOUNTAIN HOUSE PARKWAY EQUIPMENT SCHEDULE SM-7.0 10 VON SOSTEN ROAD & MOUNTAIN HOUSE PARKWAY SIGNAL MODIFICATION DE-1 11 TECHNICAL SPECIFICATIONS
DE-2 12 TECHNICAL SPECIFICATIONS
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION PROJECT
FEDERAL AID PROJECT NO. CML-5929(315)
SM-7.0
SM-6.0
SM-5.0
SM-4.0
SM-3.0
SM-2.0
SM-1.0
MOUNTAIN HOUSE CSD
N
N
OVERVIEW MAP
FIBER CABLE
ANTENNA MAIN STREET MUSTANG WAY
LOCATION MAP
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
TOWN HALL &
GENERAL PROJECT NOTES N/A
GN-1.0
2 GENERAL NOTES:
1. WORK ON THESE PLANS CONFORM TO THE 2023 EDITION OF THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD SPECIFICATIONS, STANDARD PLANS, SIGN SPECIFICATION SHEETS, SPECIAL PROVISIONS, CAMUTCD AND THE MOUNTAIN HOUSE TRAFFIC SIGNAL TECHNICAL SPECIFICATION.
2. LOCATIONS OF CONTROLLER, STANDARDS, CONDUITS, PULL BOXES AND OTHER EQUIPMENT ARE APPROXIMATE AND WILL BE LOCATED IN THE FIELD AS DIRECTED BY THE ENGINEER.
3. ALL UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY OVERHEAD AND UNDERGROUND CLEARANCE WITH MID, PG&E, PACIFIC BELL, AND OTHER AFFECTED UTILITIES PRIOR TO THE START OF WORK.
4. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF THE MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT (MHCSD) STANDARD SPECIFICATION AND DETAILS.
5. THE CONTRACTOR SHALL COMPLY WITH ALL THE STATE AND COUNTY LAWS AND ORDINANCES RELATING TO SAFETY AND CHARACTER OF WORK, EQUIPMENT AND LABOR PERSONNEL. THIS SHALL INCLUDE, BUT NOT LIMITED TO, THE SHORING OF
TRENCHES, THE VENTILATION OF CONFINED SPACES, CONFORMANCE TO THE WATCH MANUAL FOR TRAFFIC CONTROL
INCLUDING THE PROVISION AND MAINTENANCE OF BARRICADES AND THE PREPARATION OF A TRAFFIC CONTROL PLAN AS REQUIRED.
6. A MHCSD ENCROACHMENT PERMIT IS REQUIRED FOR ANY WORK WITHIN THE EXISTING MHCSD RIGHT OF WAY. PERMIT WILL SPECIFY WORK HOURS FOR WORK IN THE STREET AND LANE CLOSURE.
7. PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL ARRANGE FOR A PRE-CONSTRUCTION MEETING WITH THE MHCSD,
THE DESIGN ENGINEER, GEOTECHNICAL ENGINEER, UTILITIES AND OTHER REQUIRED INDIVIDUALS OR PUBLIC AGENCIES AT LEAST THREE (3) WORKING DAYS PRIOR TO START OF WORK.
8. THE CONTRACTOR ASSUMES SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS AT ALL TIMES. THE
CONTRACTOR SHALL PROVIDE ADEQUATE LIABILITY INSURANCE TO DEFEND, INDEMNIFY AND HOLD HARMLESS THE MHCSD AND IT'S EMPLOYEES FROM CLAIMS OR DAMAGES THAT MAY ARIES FROM THE CONSTRUCTION. REFER TO SPEC. 3-3.02 & 3-3.03.
9. THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL REQUIRED INSPECTION. THE PRESENCE OR ABSENCE OF A MHCSD
OR OTHER INSPECTOR WILL BE NOT RELIEVE THE CONTRACTOR OF FULL RESPONSIBILITY FOR THE PROPER PERFORMANCE OF THE WORK.
10. FIBER OPTIC CABLE SHALL BE A CONTINUOUS RUN WITHOUT SPLICES BETWEEN THE SIGNALS. THE CONTRACTOR SHALL
CONDUCT AN OTDR TEST OF ALL FIBER STRANDS AS PART OF THE ACCEPTANCE AND PROVIDE THE TESTING RESULTS FOR REVIEW AND APPROVAL. ALLOWABLE LOSS FOR 1310 NANOMETER WAVELENGTH SHALL BE 0.4 DB/KM AND ALLOWABLE CONNECTOR LOSS SHALL BE 0.5 DB.
11. TRAFFIC CONTROL SHALL CONFORM TO THE CAMUTCD, THE 2023 CALTRANS STANDARD PLANS AND SPECIFICATIONS, AND STANDARD PLAN T11. SIGNING AND STRIPING SHALL CONFORM TO THE SIGNING AND STRIPING PLAN DETAILS IN THE 2023 CALTRANS STANDARD PLANS.
MOUNTAIN HOUSE PARKWAY
1. INSTALL ENCOM ANTENNA ON TOP OF THE TOWN HALL BUILDING. THE TOWN HALL LOCATION IS SHOWN ABOVE.
2. RUN CAT5 CABLE FROM THE ENCOM ANTENNA INTO THE IT SERVER ROOM. CONNECT THE CAT5 CABLE TO THE PoE INJECTOR.
CONNECT THE PoE INJECTOR TO THE ETHERNET SWITCH. CONTRACTOR SHALL INSTALL PoE INJECTOR IN THE IT SERVER ROOM. CONTRACTOR SHALL INSTALL ETHERNET SWITCH IN THE IT SERVER ROOM. THE CONTRACTOR SHALL COORDINATE INSTALLATION WITH MHCSD IT STAFF.
3. CONTRACTOR SHALL INSTALL TACTICS SOFTWARE ON THE COMPUTER IN THE IT SERVER ROOM.
TOWN HALL AND LIBRARY
TRAFFIC SIGNAL CONTROLLER
AT ARNAUDO BLVD AND
MOUNTAIN HOUSE PARKWAY
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
BYRON ROAD &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-1.0
3 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
MOUNTAIN HOUSE PARKWAY
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. 6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
GRAND AVENUE &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-2.0
4 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
MOUNTAIN HOUSE PARKWAY
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. 6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
MAIN STREET &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-3.0
5 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
MOUNTAIN HOUSE PARKWAY
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. 6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
ARNAUDO BLVD &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-4.0
6 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
CONTRACTOR TO INSTALL RUGGEDCOM RS900GP ETHERNET SWITCH.
CONTRACTOR TO INSTALL PoE INJECTOR IN THE EXISTING CONTROLLER CABINET FOR WIRELESS RADIO SYSTEM. SEE TECHNICAL SPECIFICATION IN THIS PLAN SET.
CONTRACTOR TO INSTALL ENCOM 5.8 GHZ WIRELESS RADIO ANTENNA ON EXISTING LUMINARE ARM. DUAL RADIO: 58/58 2X500 MBPS THROUGHOUT WITH 1 INTEGRATED ANTENNA AND EXTERNAL CONNECTORS.
FURNISH AND INSTALL NEW FIBER CABLE FROM THE SPLICE BOX INTO THE CONTROLLER CABINET. FURNISH AND INSTALL NEW FIBER CABLE IN EXISTING EMPTY CONDUIT.
MOUNTAIN HOUSE PARKWAY
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. (N) = NEW
CONDUIT FILL INCLUDING NEW CABLE HAS BEEN VERIFIED TO BE LESS THAN 35%. CONDUIT FILL IS WITHIN ALLOWABLE STANDARD.
ANTENNA CABLE 1(N) 1(N) 1(N) 1(N) 1(N) 1(N) 1(N) 1(N)
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
MUSTANG WAY &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-5.0
7 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
CONTRACTOR TO INSTALL RUGGEDCOM RS900GP ETHERNET SWITCH.
CONTRACTOR TO INSTALL CORNING FIBER DISTRIBUTION UNIT.
CONTRACTOR TO INSTALL PoE INJECTOR IN THE EXISTING CONTROLLER CABINET FOR WIRELESS RADIO SYSTEM. SEE TECHNICAL SPECIFICATION IN THIS PLAN SET.
CONTRACTOR TO INSTALL ENCOM 5.8 GHZ WIRELESS RADIO ANTENNA ON EXISTING LUMINARE ARM. DUAL RADIO: 58/58 2X500 MBPS THROUGHOUT WITH 1 INTEGRATED ANTENNA AND EXTERNAL CONNECTORS. MUSTANG WAY
MOUNTAIN HOUSE PARKWAY
ANTENNA CABLE 1(N) 1(N) 1(N) 1(N) 1(N) 1(N) 1(N) 1(N)
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. (N) = NEW
CONDUIT FILL INCLUDING NEW CABLE HAS BEEN VERIFIED TO BE LESS THAN 35%. CONDUIT FILL IS WITHIN ALLOWABLE STANDARD.
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
GRANT LINE ROAD &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-6.0
8 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
CONTRACTOR TO INSTALL PoE INJECTOR IN THE EXISTING
CONTROLLER CABINET FOR WIRELESS RADIO
SYSTEM. SEE TECHNICAL SPECIFICATION IN THIS PLAN SET.
CONTRACTOR TO INSTALL ENCOM 5.8 GHZ WIRELESS RADIO
ANTENNA ON EXISTING LUMINARE ARM. DUAL RADIO: 58/58 2X500 MBPS THROUGHOUT WITH 1 INTEGRATED ANTENNA AND EXTERNAL
CONNECTORS.
MOUNTAIN HOUSE PARKWAY
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
GRANT LINE ROAD &
MOUNTAIN HOUSE PARKWAY
N/A EQUIPMENT SCHEDULE
SM-6.1
9 MOUNTAIN HOUSE PARKWAY
ANTENNA CABLE 1(N) 1(N) 1(N)
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. (N) = NEW
CONDUIT FILL INCLUDING NEW CABLE HAS BEEN VERIFIED TO BE LESS THAN 35%. CONDUIT FILL IS WITHIN ALLOWABLE STANDARD.
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
N
VON SOSTEN ROAD &
MOUNTAIN HOUSE PARKWAY 1" = 20' SM-7
10 PROJECT NOTES (THIS SHEET ONLY):
MOUNTAIN HOUSE CSD WILL PROVIDE IP ADDRESS FOR THE TRAFFIC SIGNAL CONTROLLER AND THE ETHERNET SWITCH.
CONTRACTOR TO INSTALL RUGGEDCOM RS900GP ETHERNET SWITCH.
CONTRACTOR TO INSTALL CORNING FIBER DISTRIBUTION UNIT.
CONTRACTOR TO INSTALL PoE INJECTOR IN THE EXISTING CONTROLLER CABINET FOR WIRELESS RADIO SYSTEM. SEE TECHNICAL SPECIFICATION IN THIS PLAN SET.
CONTRACTOR TO INSTALL ENCOM 5.8 GHZ WIRELESS RADIO ANTENNA ON EXISTING LUMINARE ARM.
MOUNTAIN HOUSE PARKWAY
ANTENNA CABLE 1(N) 1(N) 1(N) 1(N) 1(N) 1(N) 1(N) 1(N)
NOTES (THIS SHEET ONLY):
ALL CONDUITS/CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. (N) = NEW
CONDUIT FILL INCLUDING NEW CABLE HAS BEEN VERIFIED TO BE LESS THAN 35%. CONDUIT FILL IS WITHIN ALLOWABLE STANDARD.
6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
TECHNICAL SPECIFICATIONS
N/A
DE-1
11 MOUNTAIN HOUSE PARKWAY
TECHNICAL SPECIFICATIONS:
10-3.01 Ethernet Switch
Ethernet Switch shall conform to Section S86-5.03 of the latest edition of the Mountain House Community Services District (MHCSD) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Ethernet Switch as shown on the project plans. Install Eight Port Managed Ethernet Switch with Power over Ethernet.
Contractor shall coordinate with MHCSD for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Full compensation for furnishing and installing Ethernet Switch shall be considered as included in the contract bid price paid for "Furnish and Install 8-Fort Ethernet Switch with Power Ethernet" and no additional compensation will be allowed therefor. 10-3.02 Fiber Optic Cable
Fiber Optic Cable shall conform to Section S86-5.03 of the latest edition of the Mountain House Community Services District (MHCSD) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Fiber Optic Cable as shown on the project plans.
Full compensation for furnishing and installing Fiber Optic Cable shall be considered as included in the contract bid price paid for "Fiber Optic Cable" and no additional compensation will be allowed therefor. 10-3.03 Wireless Radio System
Wireless Radio System shall conform to Section S86-5.03 of the latest edition of the Mountain House Community Services District (MHCSD) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Encom Wireless Broadband Radio System as shown on the project plans, or approved equal as determined by the MHCSD. The traffic signal locations are along Mountain House Parkway at the locations below. · Arnaudo Blvd.
· Mustang Way
· Grant Line Road
· Von Sosten Road
Wireless Radio System shall include antenna and wire cable from the traffic signal mast arm to the controller cabinet as shown on the project plans.
Furnish and install Encom Wireless Broadband Radio System at the Town Hall as shown on the project plans. Furnish and install Encom Wireless Broadband Radio System or approved equal as determined by the MHCSD. Full Compensation for furnishing and installing Wireless Radio System at Town Hall shall be considered as included in the contract bid price paid for "Wireless Radio System at Town Hall" and no additional compensation will be allowed therefor.
The contractor shall install the radio antenna on the roof of the building and wire the radio to the IT server room in the Town Hall. The contractor shall install wiring and conduits necessary to run the radio antenna wire from the roof of the building into the IT server room in the Town Hall building. The contractor shall coordinate with MHCSD to install the radio antenna on the roof of the building and wiring to the IT server room in the Town Hall. The contractor shall wire through the Town Hall building from the roof into the building and into the IT server room.
The Contractor shall coordinate with MHCSD for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Wireless Radio System components shall meet the requirements specified below in this Section 10-3.03.
Ethernet Port
· 10/100/1000BaseTX
IEEE Compliance
· 802.1s/802.1w - STP/RSTP
· 802.3i -10BaseTX
· 802.3u -100BaseTX
· 802.3ab - Gigabit Ethernet
· 802.3ad - Link Aggregation / Port Bonding / Port Tracking · 802.1d - Ethernet Bridging
· 802.1p/802.11e - Traffic Prioritization / WMM and QOS · 802.1q - VLAN Tagging
· 802.11h - DFS and TPC
· 802.3af/at - Power over Ethernet
· 802.1ad - Service Tags
· 802.3x - Full Duplex and Flow Control
· VPN Compatible
Wireless Requirements
· Broadband 5.8 GHz (Unlicensed)
· 802.11 AC Compliant
· Channel Widths - 5Mhz, 10Mhz, 20Mhz, 40Mhz and 80Mhz
· Modulation - Orthogonal Frequency-Division Multiplexing (OFDM) · Transmit Power - 30 dBm
· Range - up to 60 miles based on antenna selection
· E-max protocol
· Dynamic Frequency Selection
Security Features
· 802.11i with AES-CCM Encryption
· 802.1x Authentication
· 802.11i - WPA2
· Radius Authentication compatible
· MAC Authentication
Network Management
· SSL
· SNMP
Antenna
The radio assemblies shall be furnished with a high gain, flat panel type, sector or dish antenna suitable for the application or as specified on the plans. Antenna use will be determined by distance between radios, line of sight conditions and network architecture. Prior to installation, the Contractor shall submit his proposed antenna layout to the Engineer for approval. Typical antenna arrangements shall be include:
· Single Radio - one integrated high gain flat panel antenna. · Dual Radio - one integrated high gain flat panel antenna and coax parts for dual polarity external antenna.
The panel antenna shall be weatherproof and have the same ingress protection rating as the radio enclosure.
Radio Enclosure
The radio shall be mounted within a cast aluminum or similar enclosure that meets the following requirements:
· Maximum Dimensions : 13" L x 13" W x 4" D
· Maximum Weight: 5 lbs
· Ingress Protection (IP) 67 weatherproof rating
· Operating Temperature Range: -40ºF to + 175ºF
· Humidity (non-condensing): 5% to 95%
· Integrated IP67 vent
· Industrial, weatherproof 10/100/1000 BaseTX Ethernet connector · A high visibility RSSI, power indicator with a reset button must be available on the enclosure · Female Type N antenna connectors for external antenna connections as required. The external radio shall have two Type N connectors.
Power Requirements
Power Over Ethernet
The radio units shall support Power over Ethernet (POE). A POE supply injector shall be provided with each radio. Typically, this injector will be located in the local equipment/controller cabinet and shall meet the following requirements:
· Input Voltage: 100 to 240 VAC
· Output Voltage: 0.6A @ 53 VDC
· A additional PoE port on the radio should be available by request to meet 802.3af requirements
with a maximum 13W power draw
· The injector shall have suitable lightning and surge protection integral to the unit Power Consumption
· Single Radio - 0.6A, 17W max @ 53 VDC
· Dual Radio - 0.8A max, 19W max @ 53 VDC
Integrated GPS, Antenna Feed-line and Connectors
· All coaxial cable connectors shall be EIA compliant UG1168 Utilizing captive pin technology · All external antenna connections shall be made utilizing cold shrink tubing or butyl weatherproof tape sealed with 2" electrical tape in order to provide a weathertight seal at the connector
Full compensation for furnishing and installing Wireless Radio System shall be considered as included in the contract bid price paid for "Wireless Radio System" and no additional compensation will be allowed therefor. 6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
BENCH MARK REFERENCE
CALIFORNIA
PUBLIC WORKS DEPARTMENT
CASE
DATE
SHEET __________ OF __________ DWG.
CITY ENGINEER
APPROVED BY
BY APP.
SCALE
REVISED
DESIGNED
NO. CHECKED
DRAWN
DATER.SABINIANO
J. BHATTACHARYA
01-22-2024
MOUNTAIN HOUSE PARKWAY
TRAFFIC SIGNAL SYNCHRONIZATION
12 100% R.SABINIANO
TECHNICAL SPECIFICATIONS
N/A
DE-2
12 MOUNTAIN HOUSE PARKWAY
10-3.04 Tactics Computer Software
Contractor shall furnish and install TACTICS computer software on the computer in the IT server room. The computer software for signal coordination shall be Siemens ATMS platform TACTICS software. The TACTICS software shall be compatible with SEPAC firmware in the MHCSD traffic signal controllers.
Full compensation for furnishing and installing Tactics Software shall be considered as included in the contract bid price paid for "Wireless Radio System at "Town Hall" and no additional compensation will be allowed therefor.
10-3.05 Existing Traffic Signal Controller
Traffic Signal Controller shall conform to Section S86-5.03 of the latest edition of the Mountain House Community Services District (MHCSD) Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
The existing Traffic Signal Controller shall remain as shown in the project plans.
Contractor shall coordinate with MHCSD for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Full compensation for "Existing Traffic Signal Controller" shall be considered as included in the prices paid for various items of work involved and no additional compensation will be allowed therefor. 10-3.06 Fiber Distribution Unit
Fiber Distribution Unit shall conform “Fiber Optic Termination Panels” in Section S86-5.03 of the latest edition of the Mountain House Community Services District (MHCSD) Standard Specification, the latest edition of the Caltrans Standard Specification, the California Manual on Uniform Traffic Control Devices, (CA MUTCD), and this section of the Contract Documents.
Furnish and install Fiber Distribution Unit as shown on the project plans.
Contractor shall coordinate with MHCSD for the IP address to provide fully functional communications for the traffic signals and Traffic Operations Center for this project.
Full compensation for furnishing and installing "Fiber Distribution Unit" shall be considered as included in the contract bid price paid for "Fiber Distribution Unit" and no additional compensation will be allowed therefor. 6/17/2024
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
REQUIRED CONTRACT PROVISIONS
FEDERAL-AID CONSTRUCTION
CONTRACTS
APPENDIX A
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
"General Decision Number: CA20250018 02/28/2025
Superseded General Decision Number: CA20240018
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________ |If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the | |2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2025. |
|______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2025. |
|______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 1/72 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2025
1 01/10/2025
2 02/07/2025
3 02/21/2025
4 02/28/2025
ASBE0016-004 05/01/2024
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)
Area 1......................$ 34.56 11.40
Area 2......................$ 36.53 9.27
---------------------------------------------------------------- ASBE0016-008 01/01/2024
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
Protective Coverings,
Coatings, and Finishes to all
types of mechanical systems)
Area 1......................$ 84.76 25.07
Area 2......................$ 64.56 25.07
---------------------------------------------------------------- BOIL0549-001 01/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
Rates Fringes
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 2/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
BOILERMAKER
Area 1......................$ 49.62 41.27
Area 2......................$ 45.60 38.99
---------------------------------------------------------------- * BRCA0003-001 08/01/2024
Rates Fringes
MARBLE FINISHER..................$ 42.06 19.80
---------------------------------------------------------------- * BRCA0003-003 08/01/2024
Rates Fringes
MARBLE MASON.....................$ 61.72 30.31
---------------------------------------------------------------- BRCA0003-005 05/01/2024
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings,
Madera, Mariposa, Merced....$ 51.17 25.80
( 7) San Francisco, San
Mateo.......................$ 57.02 28.50
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 56.94 26.28
( 9) Calaveras, San
Joaquin, Stanislaus,
Toulumne....................$ 52.76 25.01
(16) Monterey, Santa Cruz...$ 54.18 27.82
---------------------------------------------------------------- * BRCA0003-008 07/01/2024
Rates Fringes
TERRAZZO FINISHER................$ 44.93 20.98
TERRAZZO WORKER/SETTER...........$ 60.58 29.79
---------------------------------------------------------------- BRCA0003-011 04/01/2024
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
Rates Fringes
TILE FINISHER
Area 1......................$ 37.75 19.28
Area 2......................$ 34.76 19.22
Area 3......................$ 32.68 18.32
Tile Layer
Area 1......................$ 59.92 22.62
Area 2......................$ 55.17 22.52
Area 3......................$ 50.28 22.05
---------------------------------------------------------------- CARP0022-001 07/01/2023
San Francisco County
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 3/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 60.39 33.52
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 60.54 33.52
Journeyman Carpenter........$ 60.39 33.52
Millwright..................$ 60.49 35.11
---------------------------------------------------------------- CARP0034-001 07/01/2021
Rates Fringes
Diver
Assistant Tender, ROV
Tender/Technician...........$ 54.10 34.69
Diver standby...............$ 60.51 34.69
Diver Tender................$ 59.51 34.69
Diver wet...................$ 103.62 34.69
Manifold Operator (mixed
gas)........................$ 64.51 34.69
Manifold Operator (Standby).$ 59.51 34.69
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under
pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
---------------------------------------------------------------- CARP0034-003 07/01/2021
Rates Fringes
Piledriver.......................$ 54.10 34.69
---------------------------------------------------------------- CARP0035-007 07/01/2020
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 4/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Rates Fringes
Modular Furniture Installer
Area 1
Installer..................$ 28.76 22.53
Lead Installer.............$ 32.21 23.03
Master Installer...........$ 36.43 23.03
Area 2
Installer..................$ 26.11 22.53
Lead Installer.............$ 29.08 23.03
Master Installer...........$ 32.71 23.03
Area 3
Installer..................$ 25.16 22.53
Lead Installer.............$ 27.96 23.03
Master Installer...........$ 31.38 23.03
---------------------------------------------------------------- CARP0035-008 08/01/2020
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 52.65 31.26
Area 2......................$ 46.77 31.26
Area 3......................$ 47.27 31.26
Area 4......................$ 45.92 31.26
Drywall Stocker/Scrapper
Area 1......................$ 26.33 18.22
Area 2......................$ 23.39 18.22
Area 3......................$ 23.64 18.22
Area 4......................$ 22.97 18.22
---------------------------------------------------------------- CARP0152-001 07/01/2020
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 52.80 30.82
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 5/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Journeyman Carpenter........$ 52.65 30.82
Millwright..................$ 52.75 32.41
---------------------------------------------------------------- CARP0152-002 07/01/2020
San Joaquin County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 46.92 30.82
Journeyman Carpenter........$ 46.77 30.82
Millwright..................$ 49.27 32.41
---------------------------------------------------------------- CARP0152-004 07/01/2020
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 45.57 30.82
Journeyman Carpenter........$ 45.42 30.82
Millwright..................$ 47.92 32.41
---------------------------------------------------------------- CARP0217-001 07/01/2023
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 60.39 33.52
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 60.54 33.52
Journeyman Carpenter........$ 60.39 33.52
Millwright..................$ 60.49 35.11
---------------------------------------------------------------- CARP0405-001 07/01/2021
Santa Clara County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 6/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP0405-002 07/01/2021
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0505-001 07/01/2021
Santa Cruz County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0605-001 07/01/2021
Monterey County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0701-001 07/01/2021
Fresno and Madera Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 7/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- CARP0713-001 07/01/2021
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP1109-001 07/01/2021
Kings County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- ELEC0006-004 12/01/2024
SAN FRANCISCO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 57.18 3%+27.15
Technician..................$ 65.76 3%+27.15
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 8/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0006-007 06/01/2024
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 91.25 3%+45.315
---------------------------------------------------------------- ELEC0100-002 06/01/2024
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 45.00 29.15
---------------------------------------------------------------- ELEC0100-005 12/01/2024
FRESNO, KINGS, MADERA
Rates Fringes
Communications System
Installer...................$ 45.28 28.01
Technician..................$ 52.07 28.21
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance,
background-foreground music, intercom and telephone
interconnect, inventory control systems, microwave
transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone
interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems,
Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical
entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video
entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 9/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be
installed on open wiring systems. Energy management
systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the
scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
---------------------------------------------------------------- ELEC0234-001 12/23/2024
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN
Zone A......................$ 68.16 31.29
Zone B......................$ 74.98 31.50
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
---------------------------------------------------------------- ELEC0234-003 12/01/2021
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 47.93 24.09
Technician..................$ 55.12 24.30
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 10/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0302-001 02/27/2023
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 68.92 32.67
ELECTRICIAN......................$ 61.26 32.44
---------------------------------------------------------------- ELEC0302-003 12/01/2023
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 48.44 27.60
Technician..................$ 55.71 27.82
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0332-001 06/01/2024
SANTA CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 100.25 46.72
ELECTRICIAN......................$ 87.17 46.33
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 11/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
---------------------------------------------------------------- ELEC0332-003 12/01/2024
SANTA CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 56.68 28.35
Technician..................$ 65.18 28.61
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-001 06/01/2024
ALAMEDA COUNTY
Rates Fringes
CABLE SPLICER....................$ 84.18 3%+44.68
ELECTRICIAN......................$ 73.20 3%+44.68
---------------------------------------------------------------- ELEC0595-002 06/01/2024
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 59.34 3%+30.48
ELECTRICIAN
(1) Tunnel work.............$ 51.92 3%+30.48
(2) All other work.........$ 49.45 3%+30.48
---------------------------------------------------------------- ELEC0595-006 12/01/2024
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 12/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
ALAMEDA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 56.68 3%+26.65
Technician..................$ 65.18 3%+26.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-008 12/01/2024
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
Communications System
Installer...................$ 45.28 3%+26.65
Technician..................$ 52.07 3%+26.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0617-001 06/01/2024
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 13/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 82.00 48.05
---------------------------------------------------------------- ELEC0617-003 12/01/2023
SAN MATEO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 53.18 27.75
Technician..................$ 61.16 27.98
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0684-001 12/01/2024
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 48.50 30.09
CABLE SPLICER = 110% of Journeyman Electrician
---------------------------------------------------------------- ELEC0684-004 12/01/2024
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System
Installer...................$ 45.28 28.01
Technician..................$ 52.07 28.21
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 14/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.71
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 53.30 22.26
(3) Groundman...............$ 40.76 21.76
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0008-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC................$ 84.05 38.435+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0003-001 06/28/2023
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
SEE AREA DEFINITIONS BELOW
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 15/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 60.72 31.03
GROUP 2.....................$ 59.19 31.03
GROUP 3.....................$ 57.71 31.03
GROUP 4.....................$ 56.33 31.03
GROUP 5.....................$ 55.06 31.03
GROUP 6.....................$ 53.74 31.03
GROUP 7.....................$ 52.60 31.03
GROUP 8.....................$ 51.46 31.03
GROUP 8-A...................$ 49.25 31.03
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 52.30 31.15
Oiler......................$ 43.79 31.15
Truck crane oiler..........$ 46.08 31.15
GROUP 2
Cranes.....................$ 50.54 31.15
Oiler......................$ 42.83 31.15
Truck crane oiler..........$ 45.07 31.15
GROUP 3
Cranes.....................$ 48.80 31.15
Hydraulic..................$ 44.44 31.15
Oiler......................$ 42.55 31.15
Truck crane oiler..........$ 44.83 31.15
GROUP 4
Cranes.....................$ 45.76 31.15
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 52.64 31.15
Oiler......................$ 43.38 31.15
Truck Crane Oiler..........$ 45.66 31.15
GROUP 2
Lifting devices............$ 50.82 31.15
Oiler......................$ 43.11 31.15
Truck Crane Oiler..........$ 45.41 31.15
GROUP 3
Lifting devices............$ 49.14 31.15
Oiler......................$ 42.89 31.15
Truck Crane Oiler..........$ 45.12 31.15
GROUP 4
Lifting devices............$ 47.37 31.15
GROUP 5
Lifting devices............$ 44.73 31.15
GROUP 6
Lifting devices............$ 42.50 31.15
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 53.27 31.15
Oiler......................$ 43.72 31.15
Truck Crane Oiler..........$ 45.95 31.15
GROUP 2
Cranes.....................$ 51.50 31.15
Oiler......................$ 43.45 31.15
Truck Crane Oiler..........$ 45.73 31.15
GROUP 3
Cranes.....................$ 50.02 31.15
Hydraulic..................$ 45.07 31.15
Oiler......................$ 43.23 31.15
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 16/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Truck Crane Oiler..........$ 45.46 31.15
GROUP 4
Cranes.....................$ 48.00 31.15
GROUP 5
Cranes.....................$ 46.70 31.15
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 56.82 31.03
GROUP 1-A..................$ 59.29 31.03
GROUP 2....................$ 55.56 31.03
GROUP 3....................$ 54.23 31.03
GROUP 4....................$ 53.09 31.03
GROUP 5....................$ 51.95 31.03
UNDERGROUND:
GROUP 1....................$ 56.72 31.03
GROUP 1-A..................$ 59.19 31.03
GROUP 2....................$ 55.46 31.03
GROUP 3....................$ 54.13 31.03
GROUP 4....................$ 52.99 31.03
GROUP 5....................$ 51.85 31.03
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat
operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane
mounted continuous flight tie back machine, tonnage to
apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track
loader 4 cu. yds. and over; Wheel excavator (up to and
including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade
checker (GPS, mechanical or otherwise); Grooving and
grinding machine; Heading shield operator; Heavy-duty
drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 17/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil
stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor,
building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine,
concrete or asphalt); Mine or shaft hoist; Portable
crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled
compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine,
truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600,
Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with
attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab
machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator;
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 18/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump
operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum
sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum
cooling plant; Welding machine (powered other than by
electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
----------------------------------------------------------
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and
including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck,
non-rotating over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
-----------------------------------------------------------
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and
including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 19/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
-------------------------------------------------------------
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
-------------------------------------------------------------- --
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump
operator; Slusher operator
----------------------------------------------------------- AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]
AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE
AREA 2 -NOTED BELOW
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 20/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern Part
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MADERA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MARIPOSA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MONTEREY COUNTY:
Area 1: Remainder
Area 2: Southwestern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- ENGI0003-008 08/01/2024
Rates Fringes
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 60.61 39.55
(2) Dredge Dozer; Heavy
duty repairman.............$ 55.65 39.55
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 54.53 39.55
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 51.23 39.55
AREA 2:
(1) Leverman...............$ 62.61 39.55
(2) Dredge Dozer; Heavy
duty repairman.............$ 57.65 39.55
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 56.53 39.55
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 53.23 39.55
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 21/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 22/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with Shasta County
Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
---------------------------------------------------------------- ENGI0003-019 07/01/2024
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 52.40 28.52
AREA 2.....................$ 54.40 28.52
GROUP 2
AREA 1.....................$ 48.80 28.52
AREA 2.....................$ 50.80 28.52
GROUP 3
AREA 1.....................$ 44.19 28.52
AREA 2.....................$ 46.19 28.52
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment
shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 23/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 24/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Reaminder
TEHAMA COUNTY:
Area 1: All but the Western border with mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- IRON0377-001 01/01/2024
ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES
Rates Fringes
Ironworkers:
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 52.08 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 25/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0377-003 01/01/2024
SAN FRANCISCO CITY and COUNTY
Rates Fringes
Ironworkers:
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 52.58 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0433-005 01/01/2025
REMAINING COUNTIES
Rates Fringes
IRONWORKER
Fence Erector...............$ 45.78 26.51
Ornamental, Reinforcing
and Structural..............$ 50.70 35.15
PREMIUM PAY:
$6.00 additional per hour at the following locations:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 26/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-006 07/01/2024
AREA ""1"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND
SANTA CLARA COUNTIES
AREA ""2"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND
TUOLUMNE COUNTIES
Rates Fringes
LABORER (ASBESTOS/MOLD/LEAD
LABORER)
Area 1......................$ 37.75 29.69
Area 2......................$ 36.75 29.69
ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of
asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
---------------------------------------------------------------- LABO0073-002 07/01/2023
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 27/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
---------------------------------------------------------------- LABO0073-003 07/01/2023
SAN JOAQUIN COUNTY
Rates Fringes
LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0073-005 06/26/2023
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0073-007 06/26/2023
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 35.35 27.30
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 28/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 29/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 30/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0073-009 07/01/2023
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-003 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 31/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0261-005 06/26/2023
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0261-009 06/26/2023
SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 32/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
GROUP 1-f...................$ 31.37 23.20
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 33/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 34/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0261-011 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
MASON TENDER, BRICK..............$ 37.05 27.45
FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage:
$2.50 per day additional.
---------------------------------------------------------------- LABO0261-014 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 35/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Rates Fringes
PLASTER TENDER...................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-003 07/01/2023
AREA A: SANTA CLARA
AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person
Area A.....................$ 37.26 27.30
Area B.....................$ 36.26 27.30
Traffic Control Person I
Area A.....................$ 37.56 27.30
Area B.....................$ 36.56 27.30
Traffic Control Person II
Area A.....................$ 35.06 27.30
Area B.....................$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0270-004 06/26/2023
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 36/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0270-005 07/01/2023
MONTEREY AND SAN BENITO COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0270-007 06/26/2023
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 37/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 38/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 39/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-010 06/26/2023
SANTA CLARA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 40/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 41/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 42/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-011 07/01/2023
MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 40.68 29.68
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-001 07/01/2023
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
LABORER (Brick)
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0294-002 07/01/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0294-005 06/26/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 43/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0294-008 06/26/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 44/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 45/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 46/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0294-010 07/01/2023
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-011 07/01/2023
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-002 07/01/2023
ALAMEDA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 47/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
LABO0304-003 06/26/2023
ALAMEDA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0304-004 06/26/2023
ALAMEDA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 48/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 49/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 50/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0304-005 07/01/2023
ALAMEDA COUNTY
Rates Fringes
Brick Tender.....................$ 37.05 27.45
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-008 07/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-002 07/01/2023
CONTRA COSTA COUNTY
Rates Fringes
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 51/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0324-006 06/26/2023
CONTRA COSTA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0324-012 06/26/2023
CONTRA COSTA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 52/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 1-g...................$ 36.70 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 53/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 54/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 55/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
---------------------------------------------------------------- LABO0324-014 07/01/2023
CONTRA COSTA COUNTY:
Rates Fringes
Brick Tender.....................$ 37.05 27.45
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-018 07/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-002 07/01/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO1130-003 06/26/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 56/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO1130-005 07/01/2023
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO1130-007 06/26/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 57/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 58/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 59/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO1130-008 07/01/2023
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-009 07/01/2023
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- * PAIN0016-001 01/01/2025
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA
CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
Painters:........................$ 53.38 28.04
PREMIUMS:
EXOTIC MATERIALS - $1.25 additional per hour.
SPRAY WORK: - $0.50 additional per hour.
INDUSTRIAL PAINTING - $0.25 additional per hour
[Work on industrial buildings used for the manufacture and 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 60/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
---------------------------------------------------------------- PAIN0016-003 01/01/2024
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Rates Fringes
Drywall Finisher/Taper
AREA 1......................$ 60.41 31.34
AREA 2......................$ 56.28 29.94
---------------------------------------------------------------- PAIN0016-012 01/01/2024
ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes
SOFT FLOOR LAYER.................$ 59.00 33.03
---------------------------------------------------------------- * PAIN0016-015 01/01/2025
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PAINTER
Brush.......................$ 43.45 22.80
FOOTNOTES:
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.25 additional per hour.
HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour.
---------------------------------------------------------------- * PAIN0016-022 01/01/2025
SAN FRANCISCO COUNTY
Rates Fringes
PAINTER..........................$ 57.00 28.04
---------------------------------------------------------------- PAIN0169-001 01/01/2023
FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 61/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Rates Fringes
GLAZIER..........................$ 44.33 28.88
---------------------------------------------------------------- PAIN0169-005 01/01/2024
ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
Rates Fringes
GLAZIER..........................$ 56.22 34.00
---------------------------------------------------------------- PAIN0294-004 07/01/2023
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
PAINTER
Brush, Roller...............$ 34.49 21.80
Drywall Finisher/Taper......$ 35.74 21.80
FOOTNOTE:
Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25
additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional. ---------------------------------------------------------------- PAIN0294-005 01/01/2023
FRESNO, KINGS & MADERA
Rates Fringes
SOFT FLOOR LAYER.................$ 38.53 23.19
---------------------------------------------------------------- PAIN0767-001 01/01/2024
CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
GLAZIER..........................$ 43.25 35.62
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
Employee required to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation.
---------------------------------------------------------------- PAIN1176-001 07/01/2022
HIGHWAY IMPR0VEMENT
Rates Fringes
Parking Lot Striping/Highway
Marking:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 62/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
GROUP 1.....................$ 40.83 17.62
GROUP 2.....................$ 34.71 17.62
GROUP 3.....................$ 35.11 17.62
CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic
stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
---------------------------------------------------------------- PAIN1237-003 01/01/2024
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SOFT FLOOR LAYER.................$ 48.54 26.59
---------------------------------------------------------------- PLAS0066-002 07/01/2019
ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:
Rates Fringes
PLASTERER........................$ 42.41 30.73
---------------------------------------------------------------- PLAS0300-001 07/01/2018
Rates Fringes
PLASTERER
AREA 188: Fresno...........$ 32.70 31.68
AREA 224: San Benito,
Santa Clara, Santa Cruz.....$ 32.88 31.68
AREA 295: Calaveras & San
Joaquin Couonties...........$ 32.70 31.68
AREA 337: Monterey County..$ 32.88 31.68
AREA 429: Mariposa,
Merced, Stanislaus,
Tuolumne Counties...........$ 32.70 31.68
---------------------------------------------------------------- PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.15 23.27
---------------------------------------------------------------- PLUM0038-001 07/01/2023
SAN FRANCISCO COUNTY
Rates Fringes
PLUMBER (Plumber,
Steamfitter, Refrigeration
Fitter)..........................$ 85.50 48.98
---------------------------------------------------------------- PLUM0038-005 07/01/2023
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 63/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
SAN FRANCISCO COUNTY
Rates Fringes
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 72.68 32.91
---------------------------------------------------------------- PLUM0062-001 01/01/2025
MONTEREY AND SANTA CRUZ COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 55.00 42.35
---------------------------------------------------------------- PLUM0159-001 07/01/2024
CONTRA COSTA COUNTY
Rates Fringes
Plumber and steamfitter
(1) Refrigeration...........$ 65.28 48.04
(2) All other work..........$ 66.17 48.04
---------------------------------------------------------------- PLUM0246-001 01/01/2025
FRESNO, KINGS & MADERA COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 51.65 41.59
---------------------------------------------------------------- * PLUM0246-004 01/01/2017
FRESNO, MERCED & SAN JOAQUIN COUNIES
Rates Fringes
PLUMBER (PIPE TRADESMAN).........$ 13.00 ** 10.74
PIPE TRADESMAN SCOPE OF WORK:
Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry
packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems;
Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground
preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the
preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and
distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions;
Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 64/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
protection of buried piping; Flagman
---------------------------------------------------------------- PLUM0342-001 07/01/2023
ALAMEDA & CONTRA COSTA COUNTIES
Rates Fringes
PIPEFITTER
CONTRA COSTA COUNTY.........$ 74.00 47.45
PLUMBER, PIPEFITTER,
STEAMFITTER
ALAMEDA COUNTY..............$ 74.00 47.45
---------------------------------------------------------------- PLUM0355-004 07/01/2024
ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA,
MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES:
Rates Fringes
Underground Utility Worker
/Landscape Fitter...........$ 34.51 18.30
---------------------------------------------------------------- PLUM0393-001 07/01/2021
SAN BENITO AND SANTA CLARA COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER...............$ 68.76 46.63
---------------------------------------------------------------- PLUM0442-001 01/01/2025
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 55.95 37.64
---------------------------------------------------------------- PLUM0467-001 07/01/2024
SAN MATEO COUNTY
Rates Fringes
Plumber/Pipefitter/Steamfitter...$ 83.75 40.65
---------------------------------------------------------------- ROOF0027-002 09/01/2024
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ROOFER...........................$ 45.76 16.86
FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off:
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 65/72
Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
$2.00 per hour additional.
---------------------------------------------------------------- ROOF0040-002 08/01/2024
SAN FRANCISCO & SAN MATEO COUNTIES:
Rates Fringes
ROOFER...........................$ 55.30 22.97
---------------------------------------------------------------- ROOF0081-001 08/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Roofer...........................$ 52.47 22.31
---------------------------------------------------------------- ROOF0081-004 08/01/2024
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
ROOFER...........................$ 49.65 22.19
---------------------------------------------------------------- ROOF0095-002 08/01/2023
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:
Rates Fringes
ROOFER
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic
worker......................$ 57.17 21.51
Journeyman..................$ 53.17 21.51
Kettle person (2 kettles)...$ 55.17 21.51
---------------------------------------------------------------- SFCA0483-001 01/01/2025
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES:
Rates Fringes
SPRINKLER FITTER (FIRE)..........$ 78.94 39.10
---------------------------------------------------------------- SFCA0669-011 01/01/2025
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,
SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 46.42 28.42
---------------------------------------------------------------- SHEE0104-001 07/01/2020
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 66/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates Fringes
SHEET METAL WORKER
AREA 1:
Mechanical Contracts
under $200,000.............$ 55.92 45.29
All Other Work.............$ 64.06 46.83
AREA 2......................$ 52.90 36.44
AREA 3......................$ 55.16 34.18
---------------------------------------------------------------- SHEE0104-003 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 44.34 39.22
---------------------------------------------------------------- SHEE0104-005 07/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SHEET METAL WORKER (Excluding
metal deck and siding)...........$ 41.28 45.41
---------------------------------------------------------------- SHEE0104-007 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 44.07 40.79
---------------------------------------------------------------- SHEE0104-015 07/01/2020
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES:
Rates Fringes
SHEET METAL WORKER (Metal
Decking and Siding only).........$ 44.45 35.55
---------------------------------------------------------------- SHEE0104-018 07/01/2020
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
Sheet metal worker (Metal
decking and siding only).........$ 44.45 35.55
---------------------------------------------------------------- 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 67/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
TEAM0094-001 07/01/2024
Rates Fringes
Truck drivers:
GROUP 1.....................$ 41.54 33.25
GROUP 2.....................$ 41.84 33.25
GROUP 3.....................$ 42.14 33.25
GROUP 4.....................$ 42.49 33.25
GROUP 5.....................$ 42.84 33.25
FOOTNOTES:
Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry
pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate.
Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up
truck: Use appropriate rate for the power unit or the
equipment utilized.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used
appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and
unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit
mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson;
Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor
GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull
trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with
self-contained refuse bin; Boom truck - hydro-lift or
Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A
bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil
trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow
GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 68/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when
pulling fuel and/or grease tank trailers or other
miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman
GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage
determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
---------------------------------------------------------------- The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 69/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier. ?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which 3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 70/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to [email protected] or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to [email protected] or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to [email protected] or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 71/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
Washington, DC 20210.
================================================================ END OF GENERAL DECISION"
3/4/25, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20250018/4 72/72
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Federal Minimum Wage Rates- Required Contract Provisions Federal-Aid Construction Contracts - Appendix A Item 7.5
REQUIRED CONTRACT PROVISIONS
FEDERAL-AID CONSTRUCTION
CONTRACTS
APPENDIX B
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
1 FHWA-1273 – Revised October 23, 2023
REQUIRED CONTRACT PROVISIONS
FEDERAL-AID CONSTRUCTION CONTRACTS
I. General
II. Nondiscrimination
III. Non-segregated Facilities
IV. Davis-Bacon and Related Act Provisions
V. Contract Work Hours and Safety Standards Act
Provisions
VI. Subletting or Assigning the Contract
VII. Safety: Accident Prevention
VIII. False Statements Concerning Highway Projects
IX. Implementation of Clean Air Act and Federal Water
Pollution Control Act
X. Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion
XI. Certification Regarding Use of Contract Funds for
Lobbying
XII. Use of United States-Flag Vessels:
ATTACHMENTS
A. Employment and Materials Preference for Appalachian
Development Highway System or Appalachian Local Access
Road Contracts (included in Appalachian contracts only) I. GENERAL
1. Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding
emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR
633.102(e).
The applicable requirements of Form FHWA-1273 are
incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e).
Form FHWA-1273 must be included in all Federal-aid designbuild contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.
Contracting agencies may reference Form FHWA-1273 in
solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically
incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b).
2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d).
3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final
payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.
4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b).
The term Federal-aid highway does not include roadways
functionally classified as local roads or rural minor collectors. 23 U.S.C. 101(a).
II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part
230, Subpart A, Appendix A; EO 11246)
The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction
subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.
In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-
1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity
Construction Contract Specifications in 41 CFR 60-4.3.
Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627. The contracting agency and
the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the
Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA
requirements.
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
2 1. Equal Employment Opportunity: Equal Employment
Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:
a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409 (g)(4) & (5). b. The contractor will accept as its operating policy the following statement:
"It is the policy of this Company to assure that applicants are employed, and that employees are treated during
employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin, age or disability. Such action shall include: employment,
upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship, pre-apprenticeship, and/or on-the-job
training."
2. EEO Officer: The contractor will designate and make
known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so.
3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action or are substantially involved in such action, will be made fully cognizant of and will implement the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:
a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be
reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official.
b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.
d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.
e. The contractor's EEO policy and the procedures to
implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or
other appropriate means.
4. Recruitment: When advertising for employees, the
contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such
advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived. a. The contractor will, unless precluded by a valid
bargaining agreement, conduct systematic and direct
recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.
b. In the event the contractor has a valid bargaining
agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where
implementation of such an agreement has the effect of
discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.
c. The contractor will encourage its present employees to refer minorities and women as applicants for employment.
Information and procedures with regard to referring such applicants will be discussed with employees.
5. Personnel Actions: Wages, working conditions, and
employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age or disability.
The following procedures shall be followed:
a. The contractor will conduct periodic inspections of project sites to ensure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.
b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any
evidence of discriminatory wage practices.
c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.
d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
3 within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.
6. Training and Promotion:
a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are
applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved. b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs (i.e., apprenticeship and on-the-job training programs for the geographical area of contract performance). In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve
training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a).
c. The contractor will advise employees and applicants for employment of available training programs and entrance
requirements for each.
d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.
7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. 23 CFR 230.409. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:
a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.
b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability.
c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.
d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the
requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency.
8. Reasonable Accommodation for Applicants /
Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established thereunder. Employers must provide reasonable
accommodation in all employment activities unless to do so would cause an undue hardship.
9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not
discriminate on the grounds of race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The
contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors, suppliers, and lessors of their EEO obligations under this contract.
b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.
10. Assurances Required:
a. The requirements of 49 CFR Part 26 and the State
DOT’s FHWA-approved Disadvantaged Business Enterprise
(DBE) program are incorporated by reference.
b. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems
appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as nonresponsible. c. The Title VI and nondiscrimination provisions of U.S.
DOT Order 1050.2A at Appendixes A and E are incorporated by reference. 49 CFR Part 21.
11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA. a. The records kept by the contractor shall document the following:
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
4 (1) The number and work hours of minority and nonminority group members and women employed in each work classification on the project;
(2) The progress and efforts being made in cooperation
with unions, when applicable, to increase employment
opportunities for minorities and women; and
(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women. b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project indicating the number of minority, women, and nonminority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July.
III. NONSEGREGATED FACILITIES
This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of more than $10,000. 41 CFR 60-1.5.
As prescribed by 41 CFR 60-1.8, the contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin cannot result. The contractor may neither require such
segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location under the contractor's control where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas,
transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy
between sexes.
IV. DAVIS-BACON AND RELATED ACT PROVISIONS
This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size), in accordance with 29 CFR 5.5. The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. 23 U.S.C. 113.
This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. 23 U.S.C. 101.
Where applicable law requires that projects be treated as a project on a Federal-aid highway, the provisions of this subpart will apply regardless of the location of the project. Examples include: Surface Transportation Block Grant Program projects funded under 23 U.S.C. 133 [excluding recreational trails projects], the Nationally Significant Freight and Highway Projects funded under 23 U.S.C. 117, and National Highway Freight Program projects funded under 23 U.S.C. 167.
The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA1273 format and FHWA program requirements.
1. Minimum wages (29 CFR 5.5)
a. Wage rates and fringe benefits. All laborers and
mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid
unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by
regulations issued by the Secretary of Labor under the
Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in paragraphs (d) and (e) of 29 CFR 5.5, the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.e. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are
deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage
determination for the classification(s) of work actually performed, without regard to skill, except as provided in paragraph 4. of this section. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under paragraph 1.c. of this section) and the Davis-Bacon poster (WH–1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. b. Frequently recurring classifications. (1) In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly
submitted pursuant to paragraph 1.c. of this section, provided that:
(i) The work performed by the classification is not
performed by a classification in the wage determination for which a prevailing wage rate has been determined;
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Item 7.5
5 (ii) The classification is used in the area by the
construction industry; and
(iii) The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.
(2) The Administrator will establish wage rates for such classifications in accordance with paragraph 1.c.(1)(iii) of this section. Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
c. Conformance. (1) The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional
classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
(i) The work to be performed by the classification
requested is not performed by a classification in the wage determination; and
(ii) The classification is used in the area by the
construction industry; and
(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(2) The conformance process may not be used to split,
subdivide, or otherwise avoid application of classifications listed in the wage determination.
(3) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their
representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to [email protected]. The Administrator, or an
authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(4) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed
classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to [email protected], refer the
questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized
representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(5) The contracting officer must promptly notify the
contractor of the action taken by the Wage and Hour Division under paragraphs 1.c.(3) and (4) of this section. The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to paragraph 1.c.(3) or (4) of this section must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
d. Fringe benefits not expressed as an hourly rate.
Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.
e. Unfunded plans. If the contractor does not make
payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in § 5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the
contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
f. Interest. In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
2. Withholding (29 CFR 5.5)
a. Withholding requirements. The contracting agency may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered
necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in this section for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in § 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a
contractor's failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work all or part of the wages required by the contract, or upon the contractor's failure to submit the required records as discussed in paragraph 3.d. of this section, the contracting agency may on its own initiative and after written notice to the contractor, take such action as may be necessary to cause the
suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
b. Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
6 2.a. of this section or Section V, paragraph 3.a., or both, over claims to those funds by:
(1) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(2) A contracting agency for its reprocurement costs;
(3) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(4) A contractor's assignee(s);
(5) A contractor's successor(s); or
(6) A claim asserted under the Prompt Payment Act, 31
U.S.C. 3901–3907.
3. Records and certified payrolls (29 CFR 5.5)
a. Basic record requirements (1) Length of record retention.
All regular payrolls and other basic records must be
maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and
mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
(2) Information required. Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each
worker's correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid.
(3) Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under paragraph 1.e. of this section that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must
maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
(4) Additional records relating to apprenticeship. Contractors with apprentices working under approved programs must
maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
b. Certified payroll requirements (1) Frequency and method of submission. The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Actscovered work is performed, certified payrolls to the contracting agency. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting
agency or prime contractor permits other methods of
submission in situations where the contractor is unable or limited in its ability to use or access the electronic system. (2) Information required. The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph 3.a.(2) of this section, except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker ( e.g., the last four digits of the worker's Social Security number). The required weekly
certified payroll information may be submitted using Optional Form WH–347 or in any other format desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division website at https://www.dol.gov/sites/dolgov/files/WHD/ legacy/files/wh347/.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the contracting agency. (3) Statement of Compliance. Each certified payroll
submitted must be accompanied by a “Statement of
Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following:
(i) That the certified payroll for the payroll period contains the information required to be provided under paragraph 3.b. of this section, the appropriate information and basic records are being maintained under paragraph 3.a. of this section, and such information and records are correct and complete; (ii) That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set
forth in 29 CFR part 3; and
(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually
performed, as specified in the applicable wage determination incorporated into the contract.
(4) Use of Optional Form WH–347. The weekly submission
of a properly executed certification set forth on the reverse side of Optional Form WH–347 will satisfy the requirement for submission of the “Statement of Compliance” required by paragraph 3.b.(3) of this section.
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
7 (5) Signature. The signature by the contractor,
subcontractor, or the contractor's or subcontractor's agent must be an original handwritten signature or a legally valid electronic signature.
(6) Falsification. The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
(7) Length of certified payroll retention. The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
c. Contracts, subcontracts, and related documents. The
contractor or subcontractor must maintain this contract or subcontract and related documents including, without
limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
d. Required disclosures and access (1) Required record
disclosures and access to workers. The contractor or
subcontractor must make the records required under
paragraphs 3.a. through 3.c. of this section, and any other documents that the contracting agency, the State DOT, the FHWA, or the Department of Labor deems necessary to
determine compliance with the labor standards provisions of any of the applicable statutes referenced by § 5.1, available for inspection, copying, or transcription by authorized
representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and must permit such
representatives to interview workers during working hours on the job.
(2) Sanctions for non-compliance with records and worker access requirements. If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job, the Federal agency may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, that maintains such records or that employs such workers, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available, or to permit worker interviews during working hours on the job, may be grounds for debarment action pursuant to § 5.12. In addition, any contractor or other person that fails to submit the required records or make those records available to WHD within the time WHD requests that the records be produced will be
precluded from introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the required records that were not provided or made available to WHD. WHD will take into consideration a reasonable request from the
contractor or person for an extension of the time for
submission of records. WHD will determine the
reasonableness of the request and may consider, among other things, the location of the records and the volume of
production.
(3) Required information disclosures. Contractors and
subcontractors must maintain the full Social Security number and last known address, telephone number, and email address of each covered worker, and must provide them upon request to the contracting agency, the State DOT, the FHWA, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or other compliance action.
4. Apprentices and equal employment opportunity (29 CFR
5.5)
a. Apprentices (1) Rate of pay. Apprentices will be permitted to work at less than the predetermined rate for the work they perform when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship (OA), or with a State Apprenticeship Agency recognized by the OA. A person who is not individually registered in the program, but who has been certified by the OA or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice, will be permitted to work at less than the
predetermined rate for the work they perform in the first 90 days of probationary employment as an apprentice in such a program. In the event the OA or a State Apprenticeship
Agency recognized by the OA withdraws approval of an
apprenticeship program, the contractor will no longer be permitted to use apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(2) Fringe benefits. Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringe benefits must be paid in accordance with that
determination.
(3) Apprenticeship ratio. The allowable ratio of apprentices to journeyworkers on the job site in any craft classification must not be greater than the ratio permitted to the contractor as to the entire work force under the registered program or the ratio applicable to the locality of the project pursuant to paragraph
4.a.(4) of this section. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph 4.a.(1) of this section, must be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed.
In addition, any apprentice performing work on the job site in excess of the ratio permitted under this section must be paid not less than the applicable wage rate on the wage
determination for the work actually performed.
(4) Reciprocity of ratios and wage rates. Where a contractor is performing construction on a project in a locality other than the locality in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyworker's hourly rate) applicable within the locality in which the construction is being performed must be observed. If there is no applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified in the contractor's registered program must be observed.
b. Equal employment opportunity. The use of apprentices and journeyworkers under this part must be in conformity with Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
8 the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
c. Apprentices and Trainees (programs of the U.S. DOT).
Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not
subject to the requirements of paragraph 4 of this Section IV. 23 CFR 230.111(e)(2). The straight time hourly wage rates for apprentices and trainees under such programs will be
established by the particular programs. The ratio of
apprentices and trainees to journeyworkers shall not be greater than permitted by the terms of the particular program.
5. Compliance with Copeland Act requirements. The
contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract as provided in 29 CFR 5.5.
6. Subcontracts. The contractor or subcontractor must insert FHWA-1273 in any subcontracts, along with the applicable wage determination(s) and such other clauses or contract modifications as the contracting agency may by appropriate instructions require, and a clause requiring the subcontractors to include these clauses and wage determination(s) in any lower tier subcontracts. The prime contractor is responsible for the compliance by any subcontractor or lower tier
subcontractor with all the contract clauses in this section. In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and may be subject to debarment, as appropriate. 29 CFR 5.5.
7. Contract termination: debarment. A breach of the
contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
8. Compliance with Davis-Bacon and Related Act
requirements. All rulings and interpretations of the DavisBacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract as provided in 29 CFR 5.5.
9. Disputes concerning labor standards. As provided in 29 CFR 5.5, disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their
representatives.
10. Certification of eligibility. a. By entering into this contract, the contractor certifies that neither it nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b) or § 5.12(a).
b. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b) or § 5.12(a).
c. The penalty for making false statements is prescribed in the U.S. Code, Title 18 Crimes and Criminal Procedure, 18 U.S.C. 1001.
11. Anti-retaliation. It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
a. Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
b. Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
c. Cooperating in any investigation or other compliance action, or testifying in any proceeding under the DBA, Related Acts, this part, or 29 CFR part 1 or 3; or
d. Informing any other person about their rights under the DBA, Related Acts, this part, or 29 CFR part 1 or 3.
V. CONTRACT WORK HOURS AND SAFETY STANDARDS
ACT
Pursuant to 29 CFR 5.5(b), the following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the
Contract Work Hours and Safety Standards Act. These
clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchpersons and
guards.
1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any
workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 29 CFR
5.5. 2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph 1. of this section the contractor and any
subcontractor responsible therefor shall be liable for the unpaid wages and interest from the date of the underpayment.
In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
9 mechanic, including watchpersons and guards, employed in violation of the clause set forth in paragraph 1. of this section, in the sum currently provided in 29 CFR 5.5(b)(2)* for each calendar day on which such individual was required or
permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph 1. of this section.
* $31 as of January 15, 2023 (See 88 FR 88 FR 2210) as may be adjusted annually by the Department of Labor, pursuant to the Federal Civil Penalties Inflation Adjustment Act of 1990.
3. Withholding for unpaid wages and liquidated damages
a. Withholding process. The FHWA or the contracting
agency may, upon its own action, or must, upon written
request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be
considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for any unpaid wages;
monetary relief, including interest; and liquidated damages required by the clauses set forth in this section on this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act that is held by the same prime contractor (as defined in § 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to the Contract Work Hours and Safety Standards Act and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the
contractor liability for which the funds were withheld. b. Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with Section IV paragraph 2.a. or paragraph 3.a. of this section, or both, over claims to those funds by:
(1) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(2) A contracting agency for its reprocurement costs;
(3) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(4) A contractor's assignee(s);
(5) A contractor's successor(s); or
(6) A claim asserted under the Prompt Payment Act, 31
U.S.C. 3901–3907.
4. Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses set forth in paragraphs 1. through 5. of this section and a clause requiring the
subcontractors to include these clauses in any lower tier subcontracts. The prime contractor is responsible for
compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs 1. through 5. In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lowertier subcontractors, and associated liquidated damages and may be subject to debarment, as appropriate.
5. Anti-retaliation. It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
a. Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the Contract Work Hours and Safety Standards Act (CWHSSA) or its
implementing regulations in this part;
b. Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under CWHSSA or this part;
c. Cooperating in any investigation or other compliance action, or testifying in any proceeding under CWHSSA or this part; or
d. Informing any other person about their rights under
CWHSSA or this part.
VI. SUBLETTING OR ASSIGNING THE CONTRACT
This provision is applicable to all Federal-aid construction contracts on the National Highway System pursuant to 23 CFR 635.116.
1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be performed by subcontract and the amount of any such
specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116).
a. The term “perform work with its own organization” in paragraph 1 of Section VI refers to workers employed or leased by the prime contractor, and equipment owned or
rented by the prime contractor, with or without operators.
Such term does not include employees or equipment of a
subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be
included in this term if the prime contractor meets all of the following conditions: (based on longstanding interpretation) (1) the prime contractor maintains control over the
supervision of the day-to-day activities of the leased
employees;
(2) the prime contractor remains responsible for the quality of the work of the leased employees;
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
10 (3) the prime contractor retains all power to accept or exclude individual employees from work on the project; and (4) the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the
submission of payrolls, statements of compliance and all other Federal regulatory requirements.
b. "Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract. 23 CFR 635.102.
2. Pursuant to 23 CFR 635.116(a), the contract amount upon which the requirements set forth in paragraph (1) of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the
contractor under the contract provisions.
3. Pursuant to 23 CFR 635.116(c), the contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract.
4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the
contracting agency has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. (based on longstanding interpretation of 23 CFR 635.116).
5. The 30-percent self-performance requirement of paragraph (1) is not applicable to design-build contracts; however, contracting agencies may establish their own self-performance requirements. 23 CFR 635.116(d).
VII. SAFETY: ACCIDENT PREVENTION
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.
1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR Part 635).
The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of
employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 23 CFR 635.108.
2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any
subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR Part 1926) promulgated by the
Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). 29 CFR 1926.10.
3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704).
VIII. FALSE STATEMENTS CONCERNING HIGHWAY
PROJECTS
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.
In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federalaid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any
misunderstanding regarding the seriousness of these and similar acts, Form FHWA-1022 shall be posted on each
Federal-aid highway project (23 CFR Part 635) in one or more places where it is readily available to all persons concerned with the project:
18 U.S.C. 1020 reads as follows:
"Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or
Whoever knowingly makes any false statement, false
representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or Whoever knowingly makes any false statement or false
representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 11, 1916, (39 Stat. 355), as
amended and supplemented;
Shall be fined under this title or imprisoned not more than 5 years or both."
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
11 IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL
WATER POLLUTION CONTROL ACT (42 U.S.C. 7606; 2
CFR 200.88; EO 11738)
This provision is applicable to all Federal-aid construction contracts in excess of $150,000 and to all related
subcontracts. 48 CFR 2.101; 2 CFR 200.327.
By submission of this bid/proposal or the execution of this contract or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, subcontractor, supplier, or vendor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal Highway Administration and the Regional Office of the Environmental Protection Agency. 2 CFR Part 200, Appendix II.
The contractor agrees to include or cause to be included the requirements of this Section in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements. 2 CFR 200.327.
X. CERTIFICATION REGARDING DEBARMENT,
SUSPENSION, INELIGIBILITY AND VOLUNTARY
EXCLUSION
This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more – as defined in 2 CFR Parts 180 and 1200. 2 CFR 180.220 and
1200.220.
1. Instructions for Certification – First Tier Participants:
a. By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below. b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. 2 CFR 180.320.
c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default. 2 CFR 180.325.
d. The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed
circumstances. 2 CFR 180.345 and 180.350.
e. The terms "covered transaction," "debarred,"
"suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180, Subpart I, 180.900-180.1020, and 1200. “First Tier Covered Transactions” refers to any covered transaction between a recipient or subrecipient of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a recipient or subrecipient of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as
subcontractors and suppliers).
f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. 2 CFR 180.330.
g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. 2 CFR 180.220 and 180.300.
h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. 2 CFR 180.300; 180.320, and 180.325. A participant is responsible for
ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. 2 CFR 180.335. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the System for Award Management website (https://www.sam.gov/). 2 CFR
180.300, 180.320, and 180.325.
i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause.
The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j. Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. 2 CFR 180.325.
* * * * *
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
12 2. Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion – First Tier
Participants:
a. The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals:
(1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal
department or agency, 2 CFR 180.335;.
(2) Have not within a three-year period preceding this
proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property, 2 CFR 180.800; (3) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification, 2 CFR 180.700 and 180.800; and
(4) Have not within a three-year period preceding this
application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. 2 CFR 180.335(d).
(5) Are not a corporation that has been convicted of a felony violation under any Federal law within the two-year period preceding this proposal (USDOT Order 4200.6 implementing appropriations act requirements); and
(6) Are not a corporation with any unpaid Federal tax liability that has been assessed, for which all judicial and
administrative remedies have been exhausted, or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability (USDOT Order 4200.6 implementing appropriations act requirements).
b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant should attach an explanation to this proposal. 2 CFR 180.335 and 180.340.
* * * * *
3. Instructions for Certification - Lower Tier Participants:
(Applicable to all subcontracts, purchase orders, and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200). 2 CFR 180.220 and 1200.220.
a. By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below. b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous
certification, in addition to other remedies available to the Federal Government, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.
c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. 2 CFR 180.365.
d. The terms "covered transaction," "debarred,"
"suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180, Subpart I, 180.900 – 180.1020, and 1200.
You may contact the person to which this proposal is
submitted for assistance in obtaining a copy of those
regulations. “First Tier Covered Transactions” refers to any covered transaction between a recipient or subrecipient of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a recipient or subrecipient of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).
e. The prospective lower tier participant agrees by
submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this
transaction originated. 2 CFR 1200.220 and 1200.332.
f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. 2 CFR 180.220 and 1200.220.
g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the System for Award Management website (https://www.sam.gov/), which is compiled by the General Services Administration. 2 CFR
180.300, 180.320, 180.330, and 180.335.
h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
13 excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. 2 CFR 180.325.
* * * * *
4. Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion--Lower Tier
Participants:
a. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals:
(1) is presently debarred, suspended, proposed for
debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal
department or agency, 2 CFR 180.355;
(2) is a corporation that has been convicted of a felony violation under any Federal law within the two-year period preceding this proposal (USDOT Order 4200.6 implementing appropriations act requirements); and
(3) is a corporation with any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted, or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. (USDOT Order 4200.6 implementing appropriations act
requirements)
b. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant should attach an explanation to this proposal.
* * * * *
XI. CERTIFICATION REGARDING USE OF CONTRACT
FUNDS FOR LOBBYING
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed
$100,000. 49 CFR Part 20, App. A.
1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of
Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or
cooperative agreement.
b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this Federal contract, grant, loan, or
cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report
Lobbying," in accordance with its instructions.
2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
3. The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such
recipients shall certify and disclose accordingly.
XII. USE OF UNITED STATES-FLAG VESSELS:
This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, or any other covered transaction. 46 CFR Part 381.
This requirement applies to material or equipment that is acquired for a specific Federal-aid highway project. 46 CFR 381.7. It is not applicable to goods or materials that come into inventories independent of an FHWA funded-contract.
When oceanic shipments (or shipments across the Great
Lakes) are necessary for materials or equipment acquired for a specific Federal-aid construction project, the bidder, proposer, contractor, subcontractor, or vendor agrees:
1. To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels. 46 CFR 381.7.
2. To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, ‘on-board’ commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (b)(1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Office of Cargo and Commercial Sealift (MAR-620), Maritime
Administration, Washington, DC 20590. (MARAD requires
copies of the ocean carrier's (master) bills of lading, certified onboard, dated, with rates and charges. These bills of lading may contain business sensitive information and therefore may be submitted directly to MARAD by the Ocean Transportation Intermediary on behalf of the contractor). 46 CFR 381.7.
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
14 ATTACHMENT A - EMPLOYMENT AND MATERIALS
PREFERENCE FOR APPALACHIAN DEVELOPMENT
HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS
ROAD CONTRACTS (23 CFR 633, Subpart B, Appendix B)
This provision is applicable to all Federal-aid projects funded under the Appalachian Regional Development Act of 1965.
1. During the performance of this contract, the contractor undertaking to do work which is, or reasonably may be, done as on-site work, shall give preference to qualified persons who regularly reside in the labor area as designated by the DOL wherein the contract work is situated, or the subregion, or the Appalachian counties of the State wherein the contract work is situated, except:
a. To the extent that qualified persons regularly residing in the area are not available.
b. For the reasonable needs of the contractor to employ supervisory or specially experienced personnel necessary to assure an efficient execution of the contract work.
c. For the obligation of the contractor to offer employment to present or former employees as the result of a lawful collective bargaining contract, provided that the number of nonresident persons employed under this subparagraph (1c) shall not exceed 20 percent of the total number of employees employed by the contractor on the contract work, except as provided in subparagraph (4) below.
2. The contractor shall place a job order with the State Employment Service indicating (a) the classifications of the laborers, mechanics and other employees required to perform the contract work, (b) the number of employees required in each classification, (c) the date on which the participant estimates such employees will be required, and (d) any other pertinent information required by the State Employment
Service to complete the job order form. The job order may be placed with the State Employment Service in writing or by telephone. If during the course of the contract work, the information submitted by the contractor in the original job order is substantially modified, the participant shall promptly notify the State Employment Service.
3. The contractor shall give full consideration to all qualified job applicants referred to him by the State Employment
Service. The contractor is not required to grant employment to any job applicants who, in his opinion, are not qualified to perform the classification of work required.
4. If, within one week following the placing of a job order by the contractor with the State Employment Service, the State Employment Service is unable to refer any qualified job applicants to the contractor, or less than the number
requested, the State Employment Service will forward a
certificate to the contractor indicating the unavailability of applicants. Such certificate shall be made a part of the contractor's permanent project records. Upon receipt of this certificate, the contractor may employ persons who do not normally reside in the labor area to fill positions covered by the certificate, notwithstanding the provisions of subparagraph (1c) above.
5. The provisions of 23 CFR 633.207(e) allow the
contracting agency to provide a contractual preference for the use of mineral resource materials native to the Appalachian region.
6. The contractor shall include the provisions of Sections 1 through 4 of this Attachment A in every subcontract for work which is, or reasonably may be, done as on-site work.
Form FHWA 1273- Required Contract Provisions Federal-Aid Construction Contracts - Appendix B Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
251 E MAIN STREET, MOUNTAIN HOUSE, CA 95391
(209) 831-2300 ● (209) 831-5610 FAX
CONTRACTOR AGREEMENT
CONTRACT ID # A-2526-11
DATE: July 1, 2025
PARTIES: City of Mountain House: City of Mountain House 251 E. Main Street
Mountain House, CA 95391
CONTRACTOR: Bear Electrical Solutions, LLC
1252 State Street
Alviso, CA 95002
The Parties agree as follows:
1. Priority of Documents:
Each of the items listed below is hereby incorporated into this Agreement by this reference. In the event of an inconsistency in this Agreement, the inconsistency shall be resolved by giving precedence in the following order:
Applicable Federal and State of California statutes and regulations, this Agreement and its exhibits.
B. The following documents:
i. Notice to Bidders dated Feb 2, 2025
ii. Contractor’s Bid dated March 13, 2025
iii. Federal Bid
iv. The Project Plans and Specifications
v. Standard Specifications, Department of Transportation, State of California, dated 2023 with revisions in effect at time of project advertisement. vi. Standard Plans, Department of Transportation, State of California, dated 2023 with revisions in effect at time of project advertisement.
vii. Federal Minimum Wage Rate – Required Contract Provisions Federal -Aid Construction Contracts – Appendix A
viii. Labor surcharge and equipment rental rates, Department of Transportation, State of California
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
2 ix. Form FHWA-1273 – Required Contract Provisions Federal -Aid Construction Contracts – Appendix B
x. All Addenda (if any)
xi. General Prevailing Wage Rates, Department of Transportation, State of California
2. Terms of Services:
2.1 Scope of Services. Subject to the terms and conditions set forth in this Agreement, Contractor agrees to provide installation of wireless radio system, fiber optic cables, and the traffic control system on Mountain House Parkway between Von Sosten Road and Byron Road, as further described in Exhibit A, Scope of Service (the “Work”).
2.2 Term of Agreement. This Agreement shall commence on the July 1, 2025, and continue until June 30, 2026 unless said Work is completed on a date prior thereto or unless terminated earlier as provided herein. Contractor shall complete the Work described in Exhibit A on or before that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Contractor to complete the services required by this Agreement shall not affect City of Mountain House’s right to terminate the Agreement, as referenced in Section 8.
2.3 Standard of Performance. Contractor shall perform all Work in a first-class manner in conformance with the standards of quality normally observed by a person practicing in Contractor’s profession.
2.4 Inspection. All Work performed and materials (if any) provided by Contractor shall be subject to inspection and approval by City of Mountain House.
2.5 Contractor’s Warranties and Guarantee. Contractor warrants to City of Mountain House that all materials and equipment furnished under this Agreement will be new unless City of Mountain House agrees otherwise in writing, and that all Work will be of good quality, free from faults and defects and in conformance with this Agreement. All Work not so conforming to these standards may be deemed defective by City of Mountain House. If required by City of Mountain House, the Contractor shall furnish to City of Mountain House satisfactory evidence as to the kind and quality of materials, equipment, and methods of installation by the Contractor or sub-Contractors.
Contractor shall guarantee the Work to be free of defects in material and workmanship for a period of one (1) year following City of Mountain House’s acceptance of the Work (“Contractor’s Guarantee”). As part of Contractor’s Guarantee, Contractor agrees to make, at Contractor’s sole cost and expense, all repairs or replacements made necessary by defects in material or workmanship which become evident within the one-year guarantee period.
2.6 Assignment of Personnel. Contractor shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City of Mountain House, in its sole discretion and at any time during the term of this Agreement, desires the reassignment of any such persons, Contractor shall, immediately upon receiving notice from City of Mountain House of such desire of City of Mountain House, reassign such person or persons.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
3 2.7 Time is of the Essence. The parties agree time is of the essence. Contractor shall devote such time to the performance of the Work as may be reasonably necessary to timely finish the Work, meet the standard of performance provided in Section 2.3 above, and satisfy Contractor’s obligations hereunder.
2.8 Public Works Requirements. Because the Work described in Exhibit A constitutes a public works within the definition of Section 1720(a)(1) of the Labor Code, Contractor is required to comply with the provisions of the Labor Code applicable to public works projects, as further described in Exhibit D. Contractor shall waive, indemnify, hold harmless, and defend City of Mountain House concerning any liability arising out of Labor Code Section 1720 et seq.
3. Terms of Payment.
3.1 Compensation. City of Mountain House hereby agrees to pay Contractor a sum not to exceed Two hundred seven thousand six hundred forty-five dollars, ($207,645.00) notwithstanding any contrary indications that may be contained in Contractor’s proposal for services to be performed and reimbursable costs incurred under this Agreement. City of Mountain House shall pay Contractor for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City of Mountain House to Contractor for services rendered pursuant to this Agreement. Contractor shall submit all invoices to City of Mountain House in the manner specified herein. Except as specifically authorized by City of Mountain House in writing, Contractor shall not bill City of Mountain House for duplicate services performed by more than one person.
Contractor and City of Mountain House acknowledge and agree that compensation paid by City of Mountain House to Contractor under this Agreement is based upon Contractor’s estimated costs of providing the services required hereunder, including salaries and benefits of employees and sub-Contractors of Contractor. Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Contractor and its employees, agents, and sub-Contractors may be eligible. City of Mountain House therefore has no responsibility for such contributions beyond compensation required under this Agreement.
3.2 Invoices. Contractor shall submit invoices not more often than once a month during the term of this Agreement based on the cost for services performed and reimbursable costs incurred prior to the invoice date via e-mail to [email protected]. Invoices delivered to any other e-mail address will be deemed undelivered and not paid.
Invoices shall contain the following information:
a. Contract ID number;
b. Federal Tax Payer Identification Number;
c. The beginning and ending dates of the billing period; Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
4 d. A task summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion;
e. At City of Mountain House’s option, for each Work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the Work, the hours spent by each person, a brief description of the Work, and each reimbursable expense;
f. The total number of hours of Work performed under the Agreement by Contractor and each employee, agent, and sub-Contractor of Contractor performing services hereunder; and
g. The Contractor’s signature.
3.3 Monthly Payment. City of Mountain House shall make monthly payments, based on invoices received, for services satisfactorily performed and for authorized reimbursable costs incurred. City of Mountain House shall have thirty (30) days from the receipt of an invoice that complies with all of the requirements above to pay Contractor.
3.4 Final Payment; Retention Payment. If all services required have been satisfactorily performed, City of Mountain House shall pay the last five percent (5%) of the total sum due pursuant to this Agreement within sixty (60) days after completion and acceptance of the Work, or other applicable event under law, and submittal to City of Mountain House of a final invoice.
3.5 Total Payment.
a. City of Mountain House shall pay for the Work performed by Contractor pursuant to this Agreement. City of Mountain House shall make no payment for any extra, further, or additional service pursuant to this Agreement. b. In no event shall Contractor submit any invoice for an amount in excess of the maximum amount of compensation provided above either for a task or for the entire Agreement unless the Agreement is modified prior to the submission of such an invoice by a properly executed change order or amendment. c. City of Mountain House shall not pay any invoice or otherwise provide compensation to Contractor in excess of the maximum amount of compensation provided herein unless the Agreement is modified prior to the performance of such Work or services. d. City of Mountain House shall not pay any invoice or otherwise provide compensation to Contractor for Work or services performed after the expiration or termination of this Agreement unless the Agreement is modified prior to the performance of such Work or services.
3.6 Hourly Rate/Fees. Unless the services provided are for a lump sum or flat fee, fees for Work performed by Contractor on an hourly basis shall not exceed the amounts shown on the compensation cost proposal attached hereto as Exhibit B and incorporated herein. In Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
5 the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit B, the Agreement shall prevail.
3.7 Reimbursable Expenses. Reimbursable expenses are specified in Exhibit B.
Reimbursable expenses not listed in Exhibit B are not chargeable to City of Mountain House. Reimbursable expenses shall not include a mark-up and shall be billed as a direct costs. In no event shall expenses be advanced by City of Mountain House to the Contractor. Reimbursable expenses are included in the total amount of compensation provided under this Agreement that shall not be exceeded.
3.8 Payment of Taxes. Contractor is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes.
3.9 Payment upon Termination. In the event that City of Mountain House or Contractor terminates this Agreement pursuant to Section 8, City of Mountain House shall compensate the Contractor for all outstanding costs and reimbursable expenses incurred for Work satisfactorily completed as of the date of written notice of termination.
Contractor shall maintain adequate logs and timesheets to verify costs incurred to that date.
3.10 Authorization to Perform Services. The Contractor is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of authorization from the Contract Administrator.
4. Contractor’s Status:
4.1 Independent Contractor. In the performance of the Work, duties, and other obligations imposed by this Agreement, the Contractor is at all times acting as an Independent Contractor practicing his or her profession and not as an employee of City of Mountain House. Contractor shall perform the Work in accordance with currently approved methods and standards of practice in the Contractor’s professional specialty. A copy of Contractor’s current business license shall be provided to City of Mountain House. The Contractor shall not have any claim under this Agreement or otherwise against City of Mountain House for vacation, sick leave, retirement benefits, social security or worker’s compensation benefits. The Contractor shall be responsible for federal and state payroll taxes such as social security and unemployment. San Joaquin County will issue a form 1099 at year-end on behalf of City of Mountain House for fees earned.
4.2 Contractor Not an Agent. Except as City of Mountain House may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City of Mountain House in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, pursuant to this Agreement to bind City of Mountain House to any obligation whatsoever.
4.3 Non-Exclusive Rights. This Agreement does not grant to Contractor any exclusive privileges or rights to provide services to City of Mountain House. Contractor may contract with other agencies, private companies, or individuals for similar services.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
6 5. Legal Requirements.
5.1 Compliance. Contractor shall comply with all Federal, State and local laws, regulations and requirements necessary for performance of the Work. Contractor shall comply with all laws applicable to wages and hours of employment, occupational safety, and to fire safety, health and sanitation.
5.2 Licenses and Permits. Contractor represents and warrants to City of Mountain House that Contractor and its employees, agents, and any sub-Contractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required for the performance of the Work. Contractor represents and warrants to City of Mountain House that Contractor and its employees, agents, and any sub-Contractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required to perform the Work.
5.3 Conflict of Interest Statement. Contractor covenants that Contractor, its officers or employees or their immediate family, presently has no interest, including, but not limited to, other projects or independent contracts, and shall not acquire any such interest, direct or indirect, which would conflict in any manner or degree with the performance of the Work. Contractor further covenants that in the performance of this Agreement no person having any such interest shall be employed or retained by Contractor under this Agreement. Contractor shall not hire City of Mountain House’s employees to perform any portion of the Work, including secretarial, clerical, and similar incidental services, except upon the written approval of City of Mountain House. Performance of the Work by associates or employees of Contractor shall not relieve Contractor from any responsibility under this Agreement.
5.4 Nondiscrimination and Equal Opportunity. Contractor shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, marital status, sex, gender identity, or sexual orientation against any employee, applicant for employment, sub-Contractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Contractor pursuant to this Agreement. Contractor shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Contractor thereby.
5.5 Drug Free Workplace. Contractor shall comply with the provisions of Government Code Section 8350 et seq., otherwise known as the Drug-Free Workplace Act.
5.6 Form Law. The Laws of the State of California shall govern this Agreement. Venue is San Joaquin County. The provision of this paragraph shall survive expiration or other termination of this Agreement regardless of the cause of such termination.
5.7 Subcontracts. Contractor shall include the provisions of this Section 5 in any subcontract approved by the Contract Administrator or this Agreement.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
7 6. Indemnification, Hold Harmless and Defense.
To the fullest extent permitted by law, Contractor shall indemnify, hold harmless and defend City of Mountain House, its directors, officers, employees, agents and authorized volunteers, and each of them, from and against any and all claims, demands, causes of action, damages, penalties, judgments, awards, decrees, costs, expenses, attorneys’ fees, losses or liabilities, in law or in equity, of every kind or nature, including but not limited to personal injury, bodily injury, wrongful death, and property damage including any damage to City of Mountain House’s property, arising out of Contractor’s alleged negligence, or wrongful acts related to or in connection with Contractor’s performance of duties under the terms and conditions of this Agreement.
To the fullest extent permitted by law, City of Mountain House shall indemnify, hold harmless and defend the Contractor, its directors, officers, employees, agents and each of them (collectively referred to as “Contractor Indemnified Parties”) from and against any and all claims, demands, causes of action, damages, penalties, judgments, awards, decrees, costs, expenses, attorneys’ fees, losses or liabilities, in law or in equity, of every kind or nature, including but not limited to personal injury, bodily injury, wrongful death, and property damage including any damage to the Contractor’s property, arising out of City of Mountain House’s alleged negligence, or wrongful acts related to or in connection with City of Mountain House’s performance of duties under the terms and conditions of this Agreement.
Notwithstanding the forgoing, to the extent this Agreement is a “construction contract” as defined by Civil Code Section 2782, as may be amended from time to time, such duties of Contractor to indemnify shall not apply when to do so would be prohibited by Civil Code Section 2782.
7. Insurance.
Before beginning any Work under this Agreement, Contractor, at its own cost and expense, unless otherwise specified below, shall procure the types and amounts of insurance described in Exhibit C, incorporated herein, against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the Work hereunder by the Contractor and its agents, representatives, employees, and sub-Contractors. Consistent with the following provisions, Contractor shall provide proof satisfactory to City of Mountain House of such insurance that meets the requirements of Exhibit C and under forms of insurance satisfactory in all respects, and that such insurance is in effect prior to beginning Work to City of Mountain House. Contractor shall maintain the insurance policies required by Exhibit C throughout the term of this Agreement. The cost of such insurance shall be included in the Contractor’s proposal. Contractor shall not allow any sub-Contractor to commence Work on any subcontract until Contractor has obtained all insurance required by Exhibit C for the sub-Contractor(s) and provided evidence that such insurance is in effect to City of Mountain House. Verification of the required insurance shall be submitted and made part of this Agreement prior to execution.
8. Termination and Modification.
8.1 Termination. City of Mountain House may cancel this Agreement at any time and without cause upon written notification to Contractor. Contractor may cancel this Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
8 Agreement upon sixty (60) days’ written notice to MHSCD and shall include in such notice the reasons for cancellation.
In the event of termination, Contractor shall be entitled to compensation for services performed to the effective date of termination; City of Mountain House, however, may condition payment of such compensation upon Contractor delivering to City of Mountain House any or all work product, including, but not limited to documents, photographs, computer software, video and audio tapes, and other materials provided to Contractor or prepared by or for Contractor or City of Mountain House in connection with this Agreement.
8.2 Extension. City of Mountain House may, in its sole and exclusive discretion, extend the end date of this Agreement beyond that provided for in Section 2.2. Any such extension shall require a written amendment to this Agreement, as provided for herein. The City of Mountain House City Manager is hereby authorized to negotiate and execute such extension.
8.3 Amendments. The parties may amend this Agreement only by a writing signed by all the parties.
8.4 Assignment and Subcontracting. City of Mountain House and Contractor recognize and agree that this Agreement contemplates performance of specialized services by Contractor and is based upon a determination of Contractor’s unique competence, experience, and specialized knowledge. Contractor may not assign this Agreement or any interest therein without the prior written approval of the Contract Administrator.
Contractor shall not subcontract any portion of the performance contemplated and provided for herein, other than to the sub-Contractors noted in the proposal, without prior written approval of the Contract Administrator. Any such assignment, transfer, delegation or subcontract without the prior written consent shall be considered null and void.
8.5 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City of Mountain House and Contractor shall survive the termination of this Agreement.
8.6 Options upon Breach by Contractor. If Contractor materially breaches any of the terms of this Agreement, City of Mountain House’s remedies shall include, but not be limited to, the following:
a. Immediately terminate the Agreement;
b. Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Contractor pursuant to this Agreement; c. Retain a different Contractor to complete the Work described in Exhibit A not finished by Contractor; or
d. Charge Contractor the difference between the cost to complete the Work described in Exhibit A that is unfinished at the time of breach and the amount that City of Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
9 Mountain House would have paid Contractor pursuant to Section 3 if Contractor had completed the Work.
9. Miscellaneous.
9.1 Contract Administrator. The Contractor Administrator shall be designated, and may be changed, by the City of Mountain House City Manager in writing.
9.2 Notices. Any notice required to be given pursuant to the terms and provisions hereof shall be in writing and shall be effected by personal delivery or by first class mail, registered or certified, postage prepaid, return receipt requested. Unless otherwise designated by either party in writing, such notices shall be mailed as shown on the first page of this Agreement.
9.3 Non-Liability of Officials, Employees and Agents. No officer, official, employee or agent of City of Mountain House shall be personally liable to Contractor in the event of any default or breach by City of Mountain House or for any amount that may become due to Contractor pursuant to this Agreement.
9.4 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provisions of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which such party may be entitled.
9.5 Documents. All drawings, specifications, documents and other memoranda or writings relating to the Work hereunder, shall remain or become the property of City of Mountain House upon termination of this Agreement, whether executed by or for the Contractor for City of Mountain House, or otherwise, by or for the Contractor, or by or for a subContractor operating under the Contractor’s supervision, or direction, and all such documents and copies thereof shall be returned or transmitted to City of Mountain House forthwith upon termination or completion of the Work under this Agreement. Prior to termination Contractor shall deliver to City of Mountain House any such records upon request.
9.6 Force Majeure. It is agreed that neither party shall be responsible for delays in delivery or acceptance of delivery or failure to perform when such delay or failure is attributable to Acts of God, war, strikes, riots, lockouts, accidents, rules or regulations of any governmental agencies or other matters or conditions beyond the control of either the seller/Contractor or the purchaser.
9.7 Waiver. No waiver of any breach of any covenant or provision of this Agreement shall be deemed a waiver of any other covenant or provision hereof, and no waiver shall be valid unless in writing and executed by the waiving party. An extension of time for performance of any obligation or act shall not be deemed an extension of the time for performance of any other obligation or act, and no extension shall be valid unless in writing and executed by the waiving party.
9.8 No Third Party Beneficiaries. Nothing contained in this Agreement is intended to or shall be deemed to confer upon any person, other than the parties, any rights or remedies hereunder.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
10 9.9 Headings. The headings of the sections and exhibits of this Agreement are inserted for convenience only. They do not constitute part of this Agreement and are not to be used in its construction.
9.10 Entire Agreement and Modification. This Agreement supersedes all previous Agreements either oral or in writing and constitutes the entire understanding of the parties hereto. No changes, amendments or alterations shall be effective unless in writing and signed by both parties.
9.11 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.
IN WITNESS WHEREOF, City of Mountain House and Contractor have executed this Agreement on the day and year first written above.
Bear Electrical Solutions, LLC City of Mountain House
State of California
By: ____________________________
Robert Asuncion
By: ___________________________
Steven J. Pinkerton
City Manager
Date: _________________________ Date: _________________________ Approved as to Form:
By: ___________________________
John Bakker
City Attorney
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
EXHIBIT A
SCOPE OF SERVICES [Attached]
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
12 EXHIBIT B
COMPENSATION SCHEDULE & REIMBURSABLE EXPENSES
1) Compensation Schedule.
2) Reimbursable Expenses.
Reimbursable expenses for Contractors working for City of Mountain House shall follow the guidelines outlined below. An invoice and receipts, outlining travel expenses, shall be submitted to City of Mountain House after the travel has occurred.
Expense Type Reimbursement Policies Receipt Required
Airfare Actual cost of the least expensive class available.
Business class and first class are not reimbursable.
Yes
Airline Baggage Fees Actual expense. Yes
Rental Car Reimbursement for rental cars will be for a
standard size car or smaller and will be
reimbursed for the actual expense.
Yes
Airport Shuttle Actual expense, including gratuity. Yes Taxi Actual expense, including gratuity. Yes
Meals & Incidentals Actual expense, including gratuity. Itemized receipts must be included for reimbursement. No
alcohol.
Other incidentals per itemized receipt.
Yes
Hotel Lodging obtained will be reasonable and in line
with the moderate priced hotels for the area.
Reimbursement will be only for room charge,
taxes, and parking (if applicable).
Itemized receipts must be included for
Yes
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
13 reimbursement.
Privately Owned Vehicle
Mileage Rate
IRS allowable rate for the current year. No
Office Incidentals Actual expense.
Copies/printing, courier/express delivery fees,
phone calls.
Yes
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
14 EXHIBIT C
INSURANCE REQUIREMENTS
1) Required Coverage. Contractor shall maintain all required insurance listed herein for the duration of this Agreement.
TYPE OF INSURANCE MINIMUM LIMITS
Commercial General Liability
Premises Liability; Products and Completed
Operations; Contractual Liability; Personal
Injury and Advertising Liability
$1,000,000 per occurrence;
Bodily Injury and Property Damage
$2,000,00 in the aggregate; Commercial general
coverage shall be at least as broad as Insurance
Services Office Commercial General Liability
occurrence form CG 0001 (most recent edition)
covering comprehensive General Liability on an
“occurrence” basis
Commercial or Business Automobile
Liability
All owned vehicles, hired or leased
vehicles, non-owned, borrowed and
permissive uses. Personal Automobile
Liability is acceptable for individual
Contractors with no transportation or
hauling related activities
$1,000,000 per occurrence;
Any Auto; Bodily Injury and Property Damage.
Automobile coverage shall be at least as broad as
Insurance Services Office Automobile Liability
form CA 0001 (most recent edition), Code 1 (any
auto). No endorsement shall be attached limiting
the coverage.
Workers’ Compensation (WC) and
Employers Liability (EL)
Required for all Contractors with employees
WC: Statutory Limits
EL: $100,000 per accident for bodily injury or
disease. Contractor may rely on a self-insurance
program to meet those requirements, but only if the
program of self-insurance complies fully with the
provisions of the California Labor Code. The
insurer shall waive all rights of subrogation against
City of Mountain House and its officers, officials,
employees, and volunteers for loss arising from
Work performed under this Agreement
Professional Liability/Errors &
Omissions
Required for all Contractors performing
services with licensed professionals.
Includes endorsements of contractual
liability
$1,000,000 per occurrence
$2,000,000 policy aggregate; Any deductible or
self-insured retention shall not exceed $150,000 per
claim
2) Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy:
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
15 a) Term. All required insurance shall be maintained during the entire term of the Agreement with the following exception: Insurance policies and coverage(s) written on a claims-made basis shall be maintained during the entire term of the Agreement and until three (3) years following termination and acceptance of all Work provided under the Agreement, with the retroactive date of said insurance (as may be applicable) concurrent with the commencement of activities pursuant to this Agreement. b) Additional Insured. All insurance required above with the exception of Professional Liability, Personal Automobile Liability, Workers’ Compensation and Employers Liability, shall be endorsed to name as additional insured: City of Mountain House, its Board of Directors, and all City of Mountain House officers, agents, employees, volunteers and representatives.
c) Primary Insurance. For any claims related to this Agreement or the Work hereunder, the Contractor’s insurance covered shall be primary insurance as respects City of Mountain House, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by City of Mountain House, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. d) Cancellation. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after 30 days’ prior written notice has been provided to City of Mountain House.
e) Certificates of Insurance. Before commencing operations under this Agreement, Contractor shall provide Certificate(s) of Insurance and applicable insurance endorsements, in form and satisfactory to City of Mountain House, evidencing that all required insurance coverage is in effect. City of Mountain House reserves the rights to require the Contractor to provide complete, certified copies of all required insurance policies.
f) Sub-Contractors. Contractor shall include all sub-Contractors as an insured (covered party) under its policies or shall furnish separate certificates and endorsements for each sub-Contractor. All coverages for sub-Contractors shall be subject to all of the requirements stated herein.
g) Claims-made limitations. The following provisions shall apply if the professional liability coverage is written on a claims-made form:
i) The retroactive date of the policy must be shown and must be before the date of the Agreement.
ii) Insurance must be maintained and evidence of insurance must be provided for at least five years after completion of the Agreement or the Work, so long as commercially available at reasonable rates.
iii) If coverage is canceled or not renewed and it is not replaced with another claimsmade policy form with a retroactive date that precedes the date of this Agreement, Contractor must purchase an extended period coverage for a minimum of three (3) years after completion of Work under this Agreement.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
16 iv) A copy of the claim reporting requirements must be submitted to City of Mountain House for review prior to the commencement of any Work under this Agreement.
3) All Policies Requirements.
a) Acceptability of insurers. All insurance required by this section is to be placed with insurers with a Bests' rating of no less than A:VII. Insurance shall be maintained through an insurer with a minimum A.M. Best Rating of A- or better, with deductible amounts acceptable to City of Mountain House. Acceptance of Contractor’s insurance by City of Mountain House shall not relieve or decrease the liability of Contractor hereunder. Any deductible or self-insured retention amount or other similar obligation under the policies shall be the sole responsibility of the Contractor.
b) Deductibles and Self-Insured Retentions. Contractor shall disclose to and obtain the written approval of City of Mountain House for the self-insured retentions and deductibles before beginning any of the Work called for by any term of this Agreement.
At the option of City of Mountain House, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City of Mountain House, its officers, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to City of Mountain House guaranteeing payment of losses and related investigations, claim administration and defense expenses. c) Wasting Policies. No policy required by this Section 4 shall include a “wasting” policy limit (i.e. limit that is eroded by the cost of defense). d) Waiver of Subrogation. Contractor hereby agrees to waive subrogation which any insurer or Contractor may require from vendor by virtue of the payment of any loss.
Contractor agrees to obtain any endorsements that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the entity for all Work performed by Contractor, its employees, agents, and sub-Contractors.
4) Remedies. In addition to any other remedies City of Mountain House may have if Contractor fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City of Mountain House may, at its sole option exercise any of the following remedies, which are alternatives to other remedies City of Mountain House may have and are not the exclusive remedy for Contractor’s breach:
a) Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement;
b) Order Contractor to stop work under this Agreement or withhold any payment that becomes due to Contractor hereunder, or both stop work and withhold any payment, until Contractor demonstrates compliance with the requirements hereof; and/or c) Terminate this Agreement.
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
17 EXHIBIT D
REQUIREMENTS OF PUBLIC WORKS CONTRACTS
1) Wages. As applicable pursuant to Federal and State of California statutes and regulations:
a) In accordance with Labor Code Section 1773.2, City of Mountain House has determined the general prevailing wages in the locality in which the Work described in Exhibit A are to be performed for each craft or type of work needed, as published by the State of California Department of Industrial Relations, Division of Labor Statistics and Research, a copy of which is on file in City of Mountain House Public Works Office, and shall be made available on request. Contractor and sub-Contractors engaged in the performance of the Work shall pay no less than these rates to all persons engaged in performance of the Work.
b) In accordance with Labor Code Section 1775, Contractor and any sub-Contractors engaged in performance of the Work shall comply with Labor Code Section 1775, which establishes a penalty of up to $200 per day for each worker engaged in the performance of the Work for which Contractor or any sub-Contractor pays less than the specified prevailing wage. A mistake, inadvertence, or neglect in failing to pay the correct rate of prevailing wages is not excusable if Contractor or sub-Contractor had knowledge of their obligations under the Labor Code. Contractor or sub-Contractor shall pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate.
If a sub-Contractor worker engaged in performance of the services described in Exhibit A is not paid the general prevailing per diem wages by the sub-Contractor, Contractor is not liable for any penalties therefore unless Contractor had knowledge of that failure or unless the Contractor fails to comply with all of the following requirements:
i) The contract executed between Contractor and the sub-Contractor for the performance of part of the Work shall include a copy of the provisions of Labor Code Sections 1771, 1775, 1776, 1777.5, 1813, and 1815.
ii) Contractor shall monitor payment of the specified general prevailing rate of per diem wages by the sub-Contractor by periodic review of the sub-Contractor’s certified payroll records.
iii) Upon becoming aware of a sub-Contractor’s failure to pay the specified prevailing rate of wages, Contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the sub-Contractor for performance of the Work.
iv) Prior to making final payment to the sub-Contractor, Contractor shall obtain an affidavit signed under penalty of perjury from the sub-Contractor that the subContractor has paid the specified general prevailing rate of per diem wages for employees engaged in the performance of the Work any amounts due pursuant to Labor Code Section 1813.
c) In accordance with Labor Code Section 1776, Contractor and each sub-Contractor engaged in performance of the Work shall keep accurate payroll records showing the name, address, social security number, work, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in performance of the Work. Each payroll record Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
CONTRACT ID # A-2526-11
18 shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
i) The information contained in the payroll record is true and correct. ii) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by the employer’s employees on the public works project.
The payroll records required pursuant to Labor Code Section 1776 shall be certified and shall be available for inspection by City of Mountain House and its authorized representatives, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations, and shall otherwise be available for inspection in accordance with Labor Code Section 1776. d) In accordance with Labor Code Section 1777.5, Contractor, on behalf of Contractor and any sub-Contractors engaged in performance of the Work, shall be responsible for ensuring compliance with Labor Code Section 1777.5 governing employment and payment of apprentices on public works contracts.
e) Contractor or any sub-Contractor, in performance of the Work, employs any person in a trade or occupation (except executive, supervisory, administrative, clerical, or other nonmanual workers as such) for which no minimum wage rate has been determined by the Director of the Department of Industrial Relations, Contractor shall pay the minimum rate of wages specified therein for the classification that most nearly corresponds to the Work performed by that person. The minimum rate thus furnished shall be applicable as a minimum for such trade or occupation from the time of the initial employment of the person affected and during the continuance of such employment. 2) DIR Registration.
At all times, Contractor shall be registered with the Department of Industrial Relations and qualified to perform public work consistent with Labor Code section 1725.5, except in limited circumstances as set forth in Labor Code section 1771.1. No Contractor or sub-Contractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. Contractor agrees, in accordance with Section 1771.4 of the Labor Code, that if the Work under this Agreement qualifies as a public works project, it is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
5615290.3
Docusign Envelope ID: 6320092D-F702-4FAE-834F-E1F07407DE04 Item 7.5
ATTACHMENT B
CITY OF MOUNTAIN HOUSE
RESOLUTION NO. 2025-xx
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOUNTAIN HOUSE AWARDING A CONSTRUCTION AGREEMENT TO BEAR ELECTRICAL SOLUTIONS, LLC IN THE AMOUNT OF $207,645 FOR
THE MOUNTAIN HOUSE PARKWAY TRAFFIC SIGNAL SYNCHRONIZATION PROJECT, FEDERAL AID PROJECT NO. CML-5929(315)
WHEREAS, the City of Mountain House, acting through San Joaquin County as the federal funding sponsor, advertised for bids for the Mountain House Parkway Traffic Signal Synchronization Project, Federal Aid Project No. CML-5929(315), in accordance with applicable federal and state procurement requirements; and
WHEREAS, on March 13, 2025, a single bid was received, opened, and publicly declared by San Joaquin County; and
WHEREAS, the bid submitted by Bear Electrical Solutions, LLC, in the amount of $207,645, was reviewed and determined to be responsive and responsible and compliant with the project’s Disadvantaged Business Enterprise (DBE) goal of 14 percent; and WHEREAS, sufficient funds are available to fully support the contract award for this project; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MOUNTAIN HOUSE AS FOLLOWS:
1. The City Council hereby awards a Construction Agreement to Bear Electrical Solutions, LLC, in the amount of $207,645 for the Mountain House Parkway Traffic Signal Synchronization Project, Federal Aid Project No. CML-5929(315).
2. The City Manager is authorized and directed to execute the Construction Agreement, along with all necessary documents, on behalf of the City.
3. The City Manager is further authorized to take all necessary and appropriate actions to carry out the purpose and intent of this Resolution.
PASSED AND ADOPTED by the City Council of the City of Mountain House this 25th day of June 2025, by the following vote:
Item 7.5
ATTACHMENT B Item 7.5
TITLE: Approve a Resolution to Apply for Elective Coverage of State Disability Insurance for Full-Time and Regular Part-Time Employees
MEETING DATE: June 25, 2025
PREPARED BY: Nicole Adamo, Human Resources Manager
RECOMMENDATION
It is recommended that the City Council adopt a Resolution authorizing the City to apply for elective coverage of State Disability Insurance (SDI) for full-time and regular part-time employees. It is further recommended that the City Council authorize the City Manager to execute the application for SDI and take whatever actions are appropriate to carry out the implementation of SDI.
BACKGROUND
California State Disability Insurance provides two wage replacement insurance programs: the SDI program and the Paid Family Leave (PFL) program. These wage replacement insurance programs are managed by the California Employment Development Department (EDD) and are funded completely by employee-paid payroll tax deductions. Both programs are provided under the employee-funded SDI payroll tax and are not elected separately. There are no employer contributions for SDI coverage.
However, the employer is required to file quarterly wage earning reports and to remit the employee contributions directly to EDD.
The SDI program provides affordable, short-term (up to 52 weeks) wage replacement benefits which are approximately 60-70% of the employee’s earnings, up to a maximum weekly benefit amount, to eligible workers who suffer a loss of wages when they are unable to work due to non-work related illness or injury or due to pregnancy or childbirth. The PFL program extends disability compensation to individuals needing to take time off work to care for a seriously ill child, spouse, parent, domestic partner or to bond with a new child.
The 2025 SDI withholding rate is 1.2%, which provides for both SDI and PLF. There is no SDI taxable wage limit. The maximum weekly benefit for 2025 is $1,620.
Per the California Unemployment Insurance Code (CUIC), public entities are not required to provide SDI coverage to their employees, however under provisions of the CUIC, employers may elect SDI coverage for their employees.
Before the City was incorporated on July 1, 2024, full-time and regular part-time employees of the Mountain House Community Services District had elected SDI coverage. The District collected amounts withheld from employees’ paychecks and reported and remitted the amounts to EDD.
DISCUSSION
Item 7.6
As noted above, full-time and regular part-time employees had elected SDI coverage before incorporation.
The proposed Resolution authorizes the continued participation in the program. Staff will submit the Resolution and required application forms to EDD in order to continue coverage.
FISCAL IMPACT
There is no fiscal impact related to the adoption of the proposed Resolution. The SDI program is funded completely by employee-paid payroll tax deductions.
STRATEGIC PLAN
Adoption of the proposed Resolution supports the Human Resources mission: “.... assist employees with benefit and employment issues ... and comply with professional standards and legal requirements.” CEQA
Not applicable.
ACTION FOLLOWING CITY COUNCIL APPROVAL
Staff will submit the executed Resolution and required application forms to EDD.
ATTACHMENTS
A. Resolution for SDI participation
Item 7.6
RESOLUTION NO. 2025-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOUNTAIN HOUSE
AUTHORIZING THE CITY MANAGER TO FILE AN APPLICATION FOR ELECTIVE COVERAGE
OF STATE DISABILITY INSURANCE WITH THE STATE OF CALIFORNIA EMPLOYMENT
DEVELOPMENT DEPARTMENT FOR FULL-TIME AND REGULAR PART-TIME EMPLOYEES WHEREAS, the City of Mountain House (City) seeks to file an application for elective coverage of State Disability Insurance with the State of California Employment Development Department for full-time and regular part-time employees; and
WHEREAS, such employees have elected State Disability Insurance coverage.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council of the City of Mountain House authorizes the City Manager to file an application with the State of California Employment Development Department for elective State Disability Insurance for full-time and regular part-time employees.
BE IT FURTHER RESOLVED THAT the City Manager is hereby authorized and directed to take whatever actions are appropriate to carry out the purpose and intent of this Resolution.
Item 7.6
TITLE: Approval of Resolutions Adopting the Annual Engineers’ Reports and Levying Assessments for Fiscal Year 2025-2026 (Mountain House Community Services District Consolidated Landscape Maintenance Assessment Districts Nos. 2008-1, 2016, and 2019)
MEETING DATE: June 25, 2025
PREPARED BY: Hamid Parsa, Engineer V
Koosun Kim, Public Works Director
RECOMMENDATION
Staff recommends that City Council:
1. Approve the Annual Engineer’s Report for Consolidated Landscape Maintenance Assessment District (LMAD) No. 2008-1 for Fiscal Year 2025-2026, prepared by MacKay & Somps, dated May 14, 2025.
2. Approve the Annual Engineer’s Report for LMAD No. 2016 for Fiscal Year 2025-2026, prepared by MacKay & Somps, dated May 14, 2025.
3. Approve the Annual Engineer’s Report for LMAD No. 2019 for Fiscal Year 2025-2026, prepared by MacKay & Somps, dated May 14, 2025.
4. Levy and authorize the collection of assessments as set forth in the Engineer’s Reports, effective July 1, 2025, through June 30, 2026.
This recommendation is made in accordance with the California Streets and Highways Code § 22553.
BACKGROUND
Each year, the City of Mountain House must adopt Engineer’s Reports for its Consolidated Landscape Maintenance Assessment Districts (LMADs) to establish budgets and levy assessments for maintenance and operations. This process includes adopting resolutions of intention, conducting a noticed public hearing, and approving the levy of assessments.
The following LMADs are included in this year’s action:
Item 8.1
LMAD Date Formed Resolution Location
2008-1 February 26, 2008 R-08-117 Questa Village – Mini Park (Zone 1) 2016 July 12, 2014 R-2017-41 Cordes Village – PG&E Corridor Park 2019 August 14, 2019 R-2019-52 College Park – Parcels A, B, C, D LMAD 2008-1 (Attachment A)
Formed to fund the maintenance of a mini-park in Questa Village, as required by the Conditions of Approval (COAs) for the subdivision. The park was accepted by the City in 2019 and is currently maintained by City staff.
LMAD 2016 (Attachment B)
Established to fund maintenance of a corner park in Cordes Village located along the PG&E corridor at Grant Line Road and Providence Street. This was a requirement of the Neighborhood D West COAs.
LMAD 2019 (Attachment C and D)
Provides funding for landscape improvements in College Park Parcels A and C. These improvements fall outside the scope of the City's original park Master Plans and required a separate funding mechanism.
DISCUSSION
At its May 27, 2025, meeting, the City Council adopted Resolution Nos. 2025-27, 2025-28, and 2025-29 declaring its intent to levy assessments and setting a public hearing for June 25, 2025. Notice of the hearing was published in the Tracy Press on June 13, 2025.
At tonight’s meeting, the Council is asked to complete the second step by holding the public hearing, adopting the Annual Engineer’s Reports, and confirming the assessment levies for Fiscal Year 2025-2026.
Modest increases are proposed for LMADs 2008-1 and 2019 based on updated maintenance cost projections and allowable annual adjustments. Assessments are calculated using Dwelling Unit Equivalent Factors (dueFs) or Equivalent Dwelling Units (EDUs), which proportionally distribute costs among benefiting parcels based on land use and intensity. All assessment amounts are annual and collected through the County’s property tax bill.
LMAD 2008-1: The per-parcel assessment will increase from $50.56 to $52.08, applied per dueF, and remains below the authorized maximum of $58.66.
LMAD 2016: No change from the prior fiscal year.
LMAD 2019:
Parcel A: Increase from $151.42 to $155.96, remaining below the authorized maximum of $169.10.
Parcel C: Increase from $277.10 to $285.42, remaining below the authorized maximum of $306.15.
Item 8.1
These assessments are applied per EDU and reflect updated allocations for special and general benefits tied to in-tract and open space landscaping.
FISCAL IMPACT
The proposed assessments for Fiscal Year 2025-2026 will fund the continued maintenance and operation of public landscape improvements within each respective LMAD. Assessment revenues are collected annually through the San Joaquin County property tax roll and are restricted for use within the benefiting assessment district.
A comparison of the prior and proposed assessment rates is summarized below:
LMAD FY 2024-2025 FY 2025-2026 Increase/Decrease
2008-1
Assessment/parcel $50.56 $52.08 +$1.52
Total assessment $61,430.40 $63,277.20 +$1,846.80
2016
Assessment/parcel $50.16 $50.16 $0.00
Total assessment $40,328.64 $40,328.64 $0.00
2019 – Parcel A
Assessment/parcel $151.42 $155.96 +$4.54
Total assessment $83,586.00 $86,094.00 +$2,508.00
2019 – Parcel C
Assessment/parcel $277.10 $285.42 +$8.32
Total assessment $671,146.00 $691,281.00 +$20,135.00
All proposed assessments are within the authorized maximums established at the time of each LMAD’s formation, and any increases are consistent with the allowable annual adjustment formulas. There is no impact to the General Fund.
STRATEGIC PLAN
The adoption of the Annual Engineer’s Reports for the Consolidated Landscape Maintenance Assessment Districts supports the following City of Mountain House strategic goals and objectives:
Item 8.1
• Enhance Financial Sustainability: Facilitate the establishment of assessments to generate revenue for the maintenance and operation of LMAD improvements, ensuring a stable funding mechanism for infrastructure upkeep.
• Promote Collaborative Infrastructure Development: Strengthen partnerships with developers and stakeholders to deliver well-planned, high-quality, and consistently maintained infrastructure that safely and effectively serves residents, businesses, and visitors.
CEQA
The adoption of the Annual Engineer’s Reports and the levy of assessments for existing Landscape Maintenance Assessment Districts are not projects under CEQA, as they do not involve the approval of a physical change to the environment (CEQA Guidelines §15378).
ACTION FOLLOWING CITY COUNCIL APPROVAL
Following Council adoption of the resolutions and Engineer’s Reports, staff will transmit the approved assessments to San Joaquin County for inclusion on the Fiscal Year 2025-2026 secured property tax roll.
Staff will continue to monitor each LMAD’s budget and fund balance to ensure maintenance services remain consistent with the level of benefit provided.
ATTACHMENTS
Vicinity Maps
• Attachment A: LMAD 2008-1 – Questa Village
• Attachment B: LMAD 2016 – Cordes Village
• Attachment C: LMAD 2019 – Parcel A
• Attachment D: LMAD 2019 – Parcel C
Engineer’s Reports for FY 2025-2026
• Attachment E: LMAD 2008-1 Engineer’s Report
• Attachment F: LMAD 2016 Engineer’s Report
• Attachment G: LMAD 2019 Engineer’s Report
Previously Adopted Resolutions of Intention
• Attachment H: Resolution No. 2025-27 – LMAD 2008-1
• Attachment I: Resolution No. 2025-28 – LMAD 2016
• Attachment J: Resolution No. 2025-29 – LMAD 2019
Item 8.1
VICINITY MAP
LMAD 2008-1 – Questa Village
ATTACHMENT A
Item 8.1
VICINITY MAP
LMAD 2016 – Cordes Village
ATTACHMENT B
Item 8.1
A3
A4
A2 A1
D6
D5
D3
D1
SPECIAL BENEFIT
IN-TRACT
BOUNDARY
IN-TRACT
ATTACHMENT
Item 8.1
C
A3
A4
A2 A1
D6
D5
D3
D1
B4 B5
B2B3
D2
D4
SPECIAL BENEFIT AREA
SPECIAL BENEFIT AREA
OPEN SPACE UNDER CONSTRUCTION
COMPLETED OPEN SPACE
SPACE BOUNDARY
NOT ANNEXED OPEN
SPECIAL BENEFIT AREA
FUTURE OPEN SPACE
SPACE BOUNDARY
ANNEXED OPEN
ATTACHMENT
Item 8.1
D
ANNUAL ENGINEER’S REPORT
CITY OF MOUNTAIN HOUSE
CONSOLIDATED LANDSCAPE MAINTENANCE
ASSESSMENT DISTRICT NO. 2008-1
(Pursuant to the Lighting and Landscape Act of 1972)
PREPARED BY:
MACKAY & SOMPS
CIVIL ENGINEERS
PLEASANTON, CA 94588
May 14, 2025
ATTACHMENT E
Item 8.1
ATTACHMENT E
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2008-1.doc 3 MacKay & Somps To the Honorable Mayor and members of the City Council
of the City of Mountain House
Mountain House, California
Gentlepersons:
This Annual Engineer’s Report is for the City of Mountain House (previously the Mountain House Community Services District) which was incorporated in 2024. This report is prepared pursuant to and in compliance with the requirements of the “Landscaping and Lighting Act of 1972,” as amended, commencing with the Streets and Highways Code Sections 22500, et. seq. and with the provisions of Proposition 218 adding Article XIII D to the California Constitution.
BACKGROUND
The City of Mountain House used the provisions of the Landscape and Lighting Act of 1972 for establishing the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2008-1 (District No. 2008-1). For the 2025-2026 Fiscal Year, District No. 2008-1 consists of one (1) existing landscape maintenance district area identified by the following zone designation:
ZONE NAME
1 Questa Neighborhood (Neighborhood H)
Reference is made to all previous original and/or annual reports and assessment diagrams which are on file with the City Clerk of the City of Mountain House. The annual report is for the landscape maintenance district area in District No. 2008-1. Each landscape maintenance district area is referred to by a zone number and name, currently there is only Zone 1. The improvements and landscaping to be maintained and the method used to spread the assessment for the maintenance costs in Zone 1 shall be the same as set forth in the referenced previous original and/or annual reports and diagrams for District No. 2008-1.
LOCATION
Zone 1 is located as shown in the referenced reports and diagrams and in the Amended Assessment Diagram included as part of this 2025-2026 Fiscal Year Annual Engineer's Report for District No. 2008-1.
ATTACHMENT E
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2008-1.doc 4 MacKay & Somps
IMPROVEMENTS AND LANDSCAPING TO BE MAINTAINED
Zone 1 – Questa Neighborhood (Neighborhood H) Repair, replacement, servicing and associated incidental expenses for the maintenance and operation of the improvements, landscaping, and amenities as delineated on the improvement plans prepared by SWA Group or as specified in the City of Mountain House Standard Details and Specifications and generally described as follows:
1) street trees, shrubs, plantings, and irrigation systems, 2) earth berms, slopes, and curbs,
3) root deflectors and barriers,
4) decorative paving,
5) masonry walls,
6) sidewalks,
7) concrete or wood appurtenances, and
8) public park, Parcel A of Tract Map 3546.
ADMINISTRATION
For Zone 1, the City of Mountain House shall establish, either directly or by subcontract, an ongoing landscape maintenance management entity to be known as the Landscape Maintenance District Manager.
The Landscape Maintenance District Manager shall be responsible for:
• establishing and approving the annual budget;
• keeping an account of the maintenance, operational, and administrative costs; • administering and performing the maintenance of the improvements and landscaping, whether directly or by subcontract;
• and paying all fees, utility costs, taxes and other incidental expenses.
The Landscape Maintenance District Manager for Zone 1 and/or the City of Mountain House shall provide annually the description of improvements to be maintained and of the estimate of maintenance, operation, and administrative costs to be used in the preparation of the Annual Engineer's Report.
ATTACHMENT E
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2008-1.doc 5 MacKay & Somps
ESTIMATE OF ANNUAL COSTS
The 2025-2026 estimate of costs for the maintenance of improvements and landscaping in Zone 1 is shown in Table 1. The funds required to pay the 2025-2026 estimate of costs will be obtained from the assessments collected for the 2025-2026 tax year. Any surplus in the maintenance fund from the previous fiscal year will be used by District No. 2008-1 for the cost of operations until receipt of current fiscal year assessment revenues. Similarly, any surplus in the maintenance fund from the current fiscal year will be used by District No. 2008-1 for the cost of operations until receipt of revenues from the following fiscal year's assessments.
COST ESTIMATES BY ZONE DESIGNATION
The estimate of costs are only for maintenance of public improvements, landscaping, and park site amenities as identified for Zone 1. All landscape amenity improvements were initially installed by the Developer of the related subdivision at no cost to Zone 1. The estimated annual maintenance costs or other authorized costs are furnished by the Landscape Maintenance District Manager for Zone 1. In addition to estimated maintenance costs, the total costs which are spread each fiscal year for Zone 1 include the estimated incidental expenses incurred by the City of Mountain House, including the costs for administration, processing, budgeting, preparation of the Annual Engineer's Report, and the levying and collecting of assessments.
ANNUAL BUDGET AND TOTAL ASSESSMENT
The budget for Zone 1 of the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2008-1 is shown in the following Table 1.
ATTACHMENT E
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2008-1.doc 6 MacKay & Somps
ATTACHMENT E
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2008-1.doc 7 MacKay & Somps
FISCAL YEAR ASSESSMENT ROLL
In compliance with the Landscaping and Lighting Act of 1972, as amended, the copies of the County Assessor's Maps and County Assessor's Parcel Numbers are referenced and used in this Annual Engineer's Report for the 2025-2026 Fiscal Year for the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2008-1 as the Diagram of Assessment Parcels and are incorporated herein by reference as part of the Annual Engineer's Report. Each parcel of land set forth in the Assessment Roll for Zone 1 is identified by the County Assessor's Parcel Number (APN) and an assessment is levied against each parcel of land in the Assessment Roll in accordance with assessment spread criteria described below.
AMENDMENTS TO ASSESSMENT DIAGRAM
Where new landscape maintenance zones are to be added to the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2008-1 or where there are revisions to an existing zone, new separate sheets, identified by an Amendment Number, will be added to the Annual Engineer's Report to amend the Assessment Diagram and to show the new or revised zone. Each of the separate sheets will be an overall map showing the new or revised zone with reference to parcels as identified by County Assessor's Parcel Number (APN) and including a tabulated index of the Assessor's Maps, as amended, which make up the Assessment Diagram for the indicated new or revised zone. The tabulated index for each new or revised zone will also show whether the current referenced Assessor's Maps are contained in the Assessment Diagram of the original Engineer's Report when the District No. 2008-1 was formed, or are contained in a subsequent Revision of the Assessment Diagram, or are contained in this Annual Engineer's Report for the 2025-2026 Fiscal Year. All County Assessor's Maps referenced in an index are made a part of the Assessment Diagram by reference.
For the 2025-2026 Fiscal Year, changes have been made to the Assessment Diagram. The most recent Assessment Diagram, Amendment No. 3, showing Zone 1, is attached to this Annual Engineer's Report.
ATTACHMENT E
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2008-1.doc 8 MacKay & Somps
CRITERIA TO SPREAD THE ASSESSMENT
In general, the annual assessments for each Zone are spread in accordance with the method and procedure set forth in the Engineer's Report for the formation of each assessment district Zone as previously approved by the Board of Directors of the City of Mountain House.
In compliance with the provisions of Proposition 218, adding Article XIII D to the California Constitution, the benefits conferred on each parcel within the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2008-1 are particular and distinct benefits (hereinafter “special benefits”) which are over and above general benefits to such property or to the public at large.
Certain amenities, such as architectural landscaping, curbs, sidewalks, slopes and berms, parks, automatic irrigation systems, privacy and noise reduction architectural walls, and entrance features, were provided specially for the development of the properties within each Zone. These amenities are unique within each Zone and, therefore are determined to be 100% special benefits to the parcels within each Zone and 0% general benefits. The cost to maintain the special benefits within each Zone are assessed solely against the parcels within the Zone. Also, in keeping with the requirements of Proposition 218, no annual individual assessments shall be increased above the amounts assessed under the established criteria for each Zone for the preceding fiscal year without an election approval.
In some Zones, the total of the assessments may be higher than the preceding fiscal year due to the creation of additional subdivision parcels when the pre-established assessment criteria for the Zone are applied to the additional subdivision parcels.
As approved in the original Engineer's Report for the formation of District No. 2008-1, a cost of living adjustment factor for the 2025-2026 Fiscal Year has been applied for each Zone. The maximum assessment amount for each fiscal year shall be increased in an amount equal to the greater of: 1) three percent (3%); or 2) the percentage increase of the Consumer Price Index (CPI) for San Francisco– Oakland–San Jose County Area for All Urban Consumers, as developed by the U.S. Bureau of Labor Statistics, for a similar period of time, which is 2.40% for the prior 12 month period. For this fiscal year the maximum assessment increase utilized a rate of 3.00% which is the greater of the two rates and the appropriate escalator. If it is determined appropriate, an amount that is less than the maximum assessment may be levied as the actual annual assessment.
ATTACHMENT E
Item 8.1
ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
256-250-01 58.66$ $ 52.08 $ 52.08
256-250-02 58.66$ $ 52.08 $ 52.08
256-250-03 58.66$ $ 52.08 $ 52.08
256-250-04 58.66$ $ 52.08 $ 52.08
256-250-05 58.66$ $ 52.08 $ 52.08
256-250-06 58.66$ $ 52.08 $ 52.08
256-250-07 58.66$ $ 52.08 $ 52.08
256-250-08 58.66$ $ 52.08 $ 52.08
256-250-09 58.66$ $ 52.08 $ 52.08
256-250-10 58.66$ $ 52.08 $ 52.08
256-250-11 58.66$ $ 52.08 $ 52.08
256-250-12 58.66$ $ 52.08 $ 52.08
256-250-13 58.66$ $ 52.08 $ 52.08
256-250-14 58.66$ $ 52.08 $ 52.08
256-250-15 58.66$ $ 52.08 $ 52.08
256-250-16 58.66$ $ 52.08 $ 52.08
256-250-17 58.66$ $ 52.08 $ 52.08
256-250-18 58.66$ $ 52.08 $ 52.08
256-250-19 58.66$ $ 52.08 $ 52.08
256-250-20 58.66$ $ 52.08 $ 52.08
256-250-21 58.66$ $ 52.08 $ 52.08
256-250-22 58.66$ $ 52.08 $ 52.08
256-250-23 58.66$ $ 52.08 $ 52.08
256-250-24 58.66$ $ 52.08 $ 52.08
256-250-25 58.66$ $ 52.08 $ 52.08
256-250-26 58.66$ $ 52.08 $ 52.08
256-250-27 58.66$ $ 52.08 $ 52.08
256-250-28 58.66$ $ 52.08 $ 52.08
256-250-29 58.66$ $ 52.08 $ 52.08
256-250-30 58.66$ $ 52.08 $ 52.08
256-250-31 58.66$ $ 52.08 $ 52.08
256-250-32 58.66$ $ 52.08 $ 52.08
256-250-33 58.66$ $ 52.08 $ 52.08
256-250-34 58.66$ $ 52.08 $ 52.08
256-250-35 -$ $ - $ -
256-260-01 58.66$ $ 52.08 $ 52.08
256-260-02 58.66$ $ 52.08 $ 52.08
256-260-03 58.66$ $ 52.08 $ 52.08
256-260-04 58.66$ $ 52.08 $ 52.08
256-260-05 58.66$ $ 52.08 $ 52.08
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
1 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-260-06 58.66$ $ 52.08 $ 52.08
256-260-07 58.66$ $ 52.08 $ 52.08
256-260-08 58.66$ $ 52.08 $ 52.08
256-260-09 58.66$ $ 52.08 $ 52.08
256-260-10 58.66$ $ 52.08 $ 52.08
256-260-11 58.66$ $ 52.08 $ 52.08
256-260-12 58.66$ $ 52.08 $ 52.08
256-260-13 58.66$ $ 52.08 $ 52.08
256-260-14 58.66$ $ 52.08 $ 52.08
256-260-15 58.66$ $ 52.08 $ 52.08
256-260-16 58.66$ $ 52.08 $ 52.08
256-260-17 58.66$ $ 52.08 $ 52.08
256-260-18 58.66$ $ 52.08 $ 52.08
256-260-19 58.66$ $ 52.08 $ 52.08
256-260-20 58.66$ $ 52.08 $ 52.08
256-260-21 58.66$ $ 52.08 $ 52.08
256-260-22 58.66$ $ 52.08 $ 52.08
256-260-23 58.66$ $ 52.08 $ 52.08
256-260-24 58.66$ $ 52.08 $ 52.08
256-260-25 58.66$ $ 52.08 $ 52.08
256-260-26 58.66$ $ 52.08 $ 52.08
256-260-27 58.66$ $ 52.08 $ 52.08
256-260-28 58.66$ $ 52.08 $ 52.08
256-260-29 58.66$ $ 52.08 $ 52.08
256-260-30 58.66$ $ 52.08 $ 52.08
256-260-31 58.66$ $ 52.08 $ 52.08
256-260-32 58.66$ $ 52.08 $ 52.08
256-260-33 58.66$ $ 52.08 $ 52.08
256-260-34 58.66$ $ 52.08 $ 52.08
256-260-35 58.66$ $ 52.08 $ 52.08
256-260-36 58.66$ $ 52.08 $ 52.08
256-260-37 58.66$ $ 52.08 $ 52.08
256-260-38 58.66$ $ 52.08 $ 52.08
256-260-39 58.66$ $ 52.08 $ 52.08
256-260-40 58.66$ $ 52.08 $ 52.08
256-260-41 58.66$ $ 52.08 $ 52.08
256-260-42 58.66$ $ 52.08 $ 52.08
256-260-43 58.66$ $ 52.08 $ 52.08
256-260-44 58.66$ $ 52.08 $ 52.08
256-260-45 58.66$ $ 52.08 $ 52.08
2 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-260-46 58.66$ $ 52.08 $ 52.08
256-260-47 58.66$ $ 52.08 $ 52.08
256-260-48 58.66$ $ 52.08 $ 52.08
256-260-49 58.66$ $ 52.08 $ 52.08
256-260-50 -$ $ - $ -
256-270-01 58.66$ $ 52.08 $ 52.08
256-270-02 58.66$ $ 52.08 $ 52.08
256-270-03 58.66$ $ 52.08 $ 52.08
256-270-04 58.66$ $ 52.08 $ 52.08
256-270-05 58.66$ $ 52.08 $ 52.08
256-270-06 58.66$ $ 52.08 $ 52.08
256-270-07 58.66$ $ 52.08 $ 52.08
256-270-08 58.66$ $ 52.08 $ 52.08
256-270-09 58.66$ $ 52.08 $ 52.08
256-270-10 58.66$ $ 52.08 $ 52.08
256-270-11 58.66$ $ 52.08 $ 52.08
256-270-12 58.66$ $ 52.08 $ 52.08
256-270-13 58.66$ $ 52.08 $ 52.08
256-270-14 58.66$ $ 52.08 $ 52.08
256-270-15 58.66$ $ 52.08 $ 52.08
256-270-16 58.66$ $ 52.08 $ 52.08
256-270-17 58.66$ $ 52.08 $ 52.08
256-270-18 58.66$ $ 52.08 $ 52.08
256-270-19 58.66$ $ 52.08 $ 52.08
256-270-20 58.66$ $ 52.08 $ 52.08
256-270-21 58.66$ $ 52.08 $ 52.08
256-270-22 58.66$ $ 52.08 $ 52.08
256-270-23 58.66$ $ 52.08 $ 52.08
256-270-24 58.66$ $ 52.08 $ 52.08
256-270-25 58.66$ $ 52.08 $ 52.08
256-270-26 58.66$ $ 52.08 $ 52.08
256-270-27 58.66$ $ 52.08 $ 52.08
256-270-28 58.66$ $ 52.08 $ 52.08
256-270-29 58.66$ $ 52.08 $ 52.08
256-270-30 58.66$ $ 52.08 $ 52.08
256-270-31 58.66$ $ 52.08 $ 52.08
256-270-32 58.66$ $ 52.08 $ 52.08
256-270-33 58.66$ $ 52.08 $ 52.08
256-270-34 58.66$ $ 52.08 $ 52.08
256-270-35 58.66$ $ 52.08 $ 52.08
3 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-270-36 58.66$ $ 52.08 $ 52.08
256-270-37 58.66$ $ 52.08 $ 52.08
256-270-38 58.66$ $ 52.08 $ 52.08
256-270-39 58.66$ $ 52.08 $ 52.08
256-270-40 58.66$ $ 52.08 $ 52.08
256-270-41 58.66$ $ 52.08 $ 52.08
256-270-42 58.66$ $ 52.08 $ 52.08
256-270-43 58.66$ $ 52.08 $ 52.08
256-270-44 58.66$ $ 52.08 $ 52.08
256-270-45 58.66$ $ 52.08 $ 52.08
256-270-46 58.66$ $ 52.08 $ 52.08
256-270-47 58.66$ $ 52.08 $ 52.08
256-270-48 58.66$ $ 52.08 $ 52.08
256-270-49 58.66$ $ 52.08 $ 52.08
256-270-50 58.66$ $ 52.08 $ 52.08
256-270-51 58.66$ $ 52.08 $ 52.08
256-270-52 58.66$ $ 52.08 $ 52.08
256-270-53 58.66$ $ 52.08 $ 52.08
256-270-54 58.66$ $ 52.08 $ 52.08
256-270-55 58.66$ $ 52.08 $ 52.08
256-270-56 58.66$ $ 52.08 $ 52.08
256-270-57 58.66$ $ 52.08 $ 52.08
256-270-58 58.66$ $ 52.08 $ 52.08
256-270-59 58.66$ $ 52.08 $ 52.08
256-270-60 58.66$ $ 52.08 $ 52.08
256-270-61 58.66$ $ 52.08 $ 52.08
256-270-62 58.66$ $ 52.08 $ 52.08
256-270-63 58.66$ $ 52.08 $ 52.08
256-270-64 58.66$ $ 52.08 $ 52.08
256-270-65 58.66$ $ 52.08 $ 52.08
256-270-66 58.66$ $ 52.08 $ 52.08
256-270-67 58.66$ $ 52.08 $ 52.08
256-270-68 -$ $ - $ -
256-270-69 -$ $ - $ -
256-280-01 58.66$ $ 52.08 $ 52.08
256-280-02 58.66$ $ 52.08 $ 52.08
256-280-03 58.66$ $ 52.08 $ 52.08
256-280-04 58.66$ $ 52.08 $ 52.08
256-280-05 58.66$ $ 52.08 $ 52.08
256-280-06 58.66$ $ 52.08 $ 52.08
4 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-280-07 58.66$ $ 52.08 $ 52.08
256-280-08 58.66$ $ 52.08 $ 52.08
256-280-09 58.66$ $ 52.08 $ 52.08
256-280-10 58.66$ $ 52.08 $ 52.08
256-280-11 58.66$ $ 52.08 $ 52.08
256-280-12 58.66$ $ 52.08 $ 52.08
256-280-13 58.66$ $ 52.08 $ 52.08
256-280-14 58.66$ $ 52.08 $ 52.08
256-280-15 58.66$ $ 52.08 $ 52.08
256-280-16 58.66$ $ 52.08 $ 52.08
256-280-17 58.66$ $ 52.08 $ 52.08
256-280-18 58.66$ $ 52.08 $ 52.08
256-280-19 58.66$ $ 52.08 $ 52.08
256-280-20 58.66$ $ 52.08 $ 52.08
256-280-21 58.66$ $ 52.08 $ 52.08
256-280-22 58.66$ $ 52.08 $ 52.08
256-280-23 58.66$ $ 52.08 $ 52.08
256-280-24 58.66$ $ 52.08 $ 52.08
256-280-25 58.66$ $ 52.08 $ 52.08
256-280-26 58.66$ $ 52.08 $ 52.08
256-280-27 58.66$ $ 52.08 $ 52.08
256-280-28 -$ $ - $ -
256-280-29 -$ $ - $ -
256-290-01 58.66$ $ 52.08 $ 52.08
256-290-02 58.66$ $ 52.08 $ 52.08
256-290-03 58.66$ $ 52.08 $ 52.08
256-290-04 58.66$ $ 52.08 $ 52.08
256-290-05 58.66$ $ 52.08 $ 52.08
256-290-06 58.66$ $ 52.08 $ 52.08
256-290-07 58.66$ $ 52.08 $ 52.08
256-290-08 58.66$ $ 52.08 $ 52.08
256-290-09 58.66$ $ 52.08 $ 52.08
256-290-10 58.66$ $ 52.08 $ 52.08
256-290-11 58.66$ $ 52.08 $ 52.08
256-290-12 58.66$ $ 52.08 $ 52.08
256-290-13 58.66$ $ 52.08 $ 52.08
256-290-14 58.66$ $ 52.08 $ 52.08
256-290-15 58.66$ $ 52.08 $ 52.08
256-290-16 58.66$ $ 52.08 $ 52.08
256-290-17 58.66$ $ 52.08 $ 52.08
5 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-290-18 58.66$ $ 52.08 $ 52.08
256-290-19 58.66$ $ 52.08 $ 52.08
256-290-20 58.66$ $ 52.08 $ 52.08
256-290-21 58.66$ $ 52.08 $ 52.08
256-290-22 58.66$ $ 52.08 $ 52.08
256-290-23 58.66$ $ 52.08 $ 52.08
256-290-24 58.66$ $ 52.08 $ 52.08
256-290-25 58.66$ $ 52.08 $ 52.08
256-290-26 58.66$ $ 52.08 $ 52.08
256-290-27 58.66$ $ 52.08 $ 52.08
256-290-28 58.66$ $ 52.08 $ 52.08
256-290-29 58.66$ $ 52.08 $ 52.08
256-290-30 58.66$ $ 52.08 $ 52.08
256-290-31 58.66$ $ 52.08 $ 52.08
256-290-32 58.66$ $ 52.08 $ 52.08
256-290-33 58.66$ $ 52.08 $ 52.08
256-290-34 58.66$ $ 52.08 $ 52.08
256-290-35 58.66$ $ 52.08 $ 52.08
256-290-36 58.66$ $ 52.08 $ 52.08
256-290-37 58.66$ $ 52.08 $ 52.08
256-290-38 58.66$ $ 52.08 $ 52.08
256-290-39 58.66$ $ 52.08 $ 52.08
256-290-40 58.66$ $ 52.08 $ 52.08
256-290-41 58.66$ $ 52.08 $ 52.08
256-290-42 58.66$ $ 52.08 $ 52.08
256-290-43 58.66$ $ 52.08 $ 52.08
256-290-44 58.66$ $ 52.08 $ 52.08
256-290-45 58.66$ $ 52.08 $ 52.08
256-290-46 58.66$ $ 52.08 $ 52.08
256-290-47 58.66$ $ 52.08 $ 52.08
256-290-48 58.66$ $ 52.08 $ 52.08
256-290-49 58.66$ $ 52.08 $ 52.08
256-290-50 58.66$ $ 52.08 $ 52.08
256-290-51 58.66$ $ 52.08 $ 52.08
256-290-52 58.66$ $ 52.08 $ 52.08
256-290-53 58.66$ $ 52.08 $ 52.08
256-290-54 58.66$ $ 52.08 $ 52.08
256-290-55 58.66$ $ 52.08 $ 52.08
256-290-56 58.66$ $ 52.08 $ 52.08
256-290-57 58.66$ $ 52.08 $ 52.08
6 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-290-58 58.66$ $ 52.08 $ 52.08
256-290-59 58.66$ $ 52.08 $ 52.08
256-290-60 58.66$ $ 52.08 $ 52.08
256-290-61 58.66$ $ 52.08 $ 52.08
256-290-62 58.66$ $ 52.08 $ 52.08
256-290-63 58.66$ $ 52.08 $ 52.08
256-290-64 58.66$ $ 52.08 $ 52.08
256-290-65 58.66$ $ 52.08 $ 52.08
256-290-66 58.66$ $ 52.08 $ 52.08
256-290-67 58.66$ $ 52.08 $ 52.08
256-290-68 58.66$ $ 52.08 $ 52.08
256-290-69 58.66$ $ 52.08 $ 52.08
256-290-70 58.66$ $ 52.08 $ 52.08
256-290-71 58.66$ $ 52.08 $ 52.08
256-290-72 58.66$ $ 52.08 $ 52.08
256-290-73 58.66$ $ 52.08 $ 52.08
256-290-74 -$ $ - $ -
256-300-01 58.66$ $ 52.08 $ 52.08
256-300-02 58.66$ $ 52.08 $ 52.08
256-300-03 58.66$ $ 52.08 $ 52.08
256-300-04 58.66$ $ 52.08 $ 52.08
256-300-05 58.66$ $ 52.08 $ 52.08
256-300-06 58.66$ $ 52.08 $ 52.08
256-300-07 58.66$ $ 52.08 $ 52.08
256-300-08 58.66$ $ 52.08 $ 52.08
256-300-09 58.66$ $ 52.08 $ 52.08
256-300-10 58.66$ $ 52.08 $ 52.08
256-300-11 58.66$ $ 52.08 $ 52.08
256-300-12 58.66$ $ 52.08 $ 52.08
256-300-13 58.66$ $ 52.08 $ 52.08
256-300-14 58.66$ $ 52.08 $ 52.08
256-300-15 58.66$ $ 52.08 $ 52.08
256-300-16 58.66$ $ 52.08 $ 52.08
256-300-17 58.66$ $ 52.08 $ 52.08
256-300-18 58.66$ $ 52.08 $ 52.08
256-300-19 58.66$ $ 52.08 $ 52.08
256-300-20 58.66$ $ 52.08 $ 52.08
256-300-21 58.66$ $ 52.08 $ 52.08
256-300-22 58.66$ $ 52.08 $ 52.08
256-300-23 58.66$ $ 52.08 $ 52.08
7 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-300-24 58.66$ $ 52.08 $ 52.08
256-300-25 58.66$ $ 52.08 $ 52.08
256-300-26 58.66$ $ 52.08 $ 52.08
256-300-27 58.66$ $ 52.08 $ 52.08
256-300-28 58.66$ $ 52.08 $ 52.08
256-300-29 58.66$ $ 52.08 $ 52.08
256-300-30 58.66$ $ 52.08 $ 52.08
256-300-31 58.66$ $ 52.08 $ 52.08
256-300-32 58.66$ $ 52.08 $ 52.08
256-300-35 58.66$ $ 52.08 $ 52.08
256-300-36 58.66$ $ 52.08 $ 52.08
256-300-37 58.66$ $ 52.08 $ 52.08
256-300-38 58.66$ $ 52.08 $ 52.08
256-300-39 58.66$ $ 52.08 $ 52.08
256-300-40 58.66$ $ 52.08 $ 52.08
256-300-41 58.66$ $ 52.08 $ 52.08
256-300-42 58.66$ $ 52.08 $ 52.08
256-300-43 58.66$ $ 52.08 $ 52.08
256-300-44 58.66$ $ 52.08 $ 52.08
256-300-45 58.66$ $ 52.08 $ 52.08
256-300-46 58.66$ $ 52.08 $ 52.08
256-300-47 58.66$ $ 52.08 $ 52.08
256-300-48 58.66$ $ 52.08 $ 52.08
256-300-49 58.66$ $ 52.08 $ 52.08
256-300-50 58.66$ $ 52.08 $ 52.08
256-300-51 58.66$ $ 52.08 $ 52.08
256-300-52 58.66$ $ 52.08 $ 52.08
256-300-53 58.66$ $ 52.08 $ 52.08
256-300-54 58.66$ $ 52.08 $ 52.08
256-300-55 58.66$ $ 52.08 $ 52.08
256-300-56 58.66$ $ 52.08 $ 52.08
256-300-57 58.66$ $ 52.08 $ 52.08
256-300-58 58.66$ $ 52.08 $ 52.08
256-300-59 58.66$ $ 52.08 $ 52.08
256-300-60 58.66$ $ 52.08 $ 52.08
256-300-61 58.66$ $ 52.08 $ 52.08
256-300-62 58.66$ $ 52.08 $ 52.08
256-300-63 58.66$ $ 52.08 $ 52.08
256-300-64 58.66$ $ 52.08 $ 52.08
256-300-65 58.66$ $ 52.08 $ 52.08
8 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-300-66 58.66$ $ 52.08 $ 52.08
256-300-67 58.66$ $ 52.08 $ 52.08
256-300-68 58.66$ $ 52.08 $ 52.08
256-300-69 58.66$ $ 52.08 $ 52.08
256-300-70 58.66$ $ 52.08 $ 52.08
256-300-71 58.66$ $ 52.08 $ 52.08
256-300-72 58.66$ $ 52.08 $ 52.08
256-300-73 58.66$ $ 52.08 $ 52.08
256-300-74 58.66$ $ 52.08 $ 52.08
256-300-75 58.66$ $ 52.08 $ 52.08
256-300-76 58.66$ $ 52.08 $ 52.08
256-310-01 58.66$ $ 52.08 $ 52.08
256-310-02 58.66$ $ 52.08 $ 52.08
256-310-03 58.66$ $ 52.08 $ 52.08
256-310-04 58.66$ $ 52.08 $ 52.08
256-310-05 58.66$ $ 52.08 $ 52.08
256-310-06 58.66$ $ 52.08 $ 52.08
256-310-07 58.66$ $ 52.08 $ 52.08
256-310-08 58.66$ $ 52.08 $ 52.08
256-310-09 58.66$ $ 52.08 $ 52.08
256-310-10 58.66$ $ 52.08 $ 52.08
256-310-11 58.66$ $ 52.08 $ 52.08
256-310-12 58.66$ $ 52.08 $ 52.08
256-310-13 58.66$ $ 52.08 $ 52.08
256-310-14 58.66$ $ 52.08 $ 52.08
256-310-15 58.66$ $ 52.08 $ 52.08
256-310-16 58.66$ $ 52.08 $ 52.08
256-310-17 58.66$ $ 52.08 $ 52.08
256-310-18 58.66$ $ 52.08 $ 52.08
256-310-19 58.66$ $ 52.08 $ 52.08
256-310-20 58.66$ $ 52.08 $ 52.08
256-310-21 58.66$ $ 52.08 $ 52.08
256-310-22 58.66$ $ 52.08 $ 52.08
256-310-23 58.66$ $ 52.08 $ 52.08
256-310-24 58.66$ $ 52.08 $ 52.08
256-310-25 58.66$ $ 52.08 $ 52.08
256-310-26 58.66$ $ 52.08 $ 52.08
256-310-27 58.66$ $ 52.08 $ 52.08
256-310-28 58.66$ $ 52.08 $ 52.08
256-310-29 58.66$ $ 52.08 $ 52.08
9 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-310-30 58.66$ $ 52.08 $ 52.08
256-310-31 58.66$ $ 52.08 $ 52.08
256-310-32 58.66$ $ 52.08 $ 52.08
256-310-33 58.66$ $ 52.08 $ 52.08
256-310-34 58.66$ $ 52.08 $ 52.08
256-310-35 58.66$ $ 52.08 $ 52.08
256-310-36 58.66$ $ 52.08 $ 52.08
256-310-37 58.66$ $ 52.08 $ 52.08
256-310-38 58.66$ $ 52.08 $ 52.08
256-310-39 58.66$ $ 52.08 $ 52.08
256-310-40 58.66$ $ 52.08 $ 52.08
256-310-41 58.66$ $ 52.08 $ 52.08
256-310-42 58.66$ $ 52.08 $ 52.08
256-310-43 58.66$ $ 52.08 $ 52.08
256-310-44 58.66$ $ 52.08 $ 52.08
256-310-45 58.66$ $ 52.08 $ 52.08
256-310-46 58.66$ $ 52.08 $ 52.08
256-310-47 58.66$ $ 52.08 $ 52.08
256-310-48 58.66$ $ 52.08 $ 52.08
256-310-49 58.66$ $ 52.08 $ 52.08
256-310-50 58.66$ $ 52.08 $ 52.08
256-310-51 58.66$ $ 52.08 $ 52.08
256-310-52 58.66$ $ 52.08 $ 52.08
256-310-53 58.66$ $ 52.08 $ 52.08
256-310-54 58.66$ $ 52.08 $ 52.08
256-310-55 58.66$ $ 52.08 $ 52.08
256-310-56 58.66$ $ 52.08 $ 52.08
256-310-57 58.66$ $ 52.08 $ 52.08
256-310-58 58.66$ $ 52.08 $ 52.08
256-310-59 58.66$ $ 52.08 $ 52.08
256-310-60 58.66$ $ 52.08 $ 52.08
256-310-61 -$ $ - $ -
256-310-62 -$ $ - $ -
256-310-63 -$ $ - $ -
256-320-01 58.66$ $ 52.08 $ 52.08
256-320-02 58.66$ $ 52.08 $ 52.08
256-320-03 58.66$ $ 52.08 $ 52.08
256-320-04 58.66$ $ 52.08 $ 52.08
256-320-05 58.66$ $ 52.08 $ 52.08
256-320-06 58.66$ $ 52.08 $ 52.08
10 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-320-07 58.66$ $ 52.08 $ 52.08
256-320-08 58.66$ $ 52.08 $ 52.08
256-320-09 58.66$ $ 52.08 $ 52.08
256-320-10 58.66$ $ 52.08 $ 52.08
256-320-11 58.66$ $ 52.08 $ 52.08
256-320-12 58.66$ $ 52.08 $ 52.08
256-320-13 58.66$ $ 52.08 $ 52.08
256-320-14 58.66$ $ 52.08 $ 52.08
256-320-15 58.66$ $ 52.08 $ 52.08
256-320-16 58.66$ $ 52.08 $ 52.08
256-320-17 58.66$ $ 52.08 $ 52.08
256-320-18 58.66$ $ 52.08 $ 52.08
256-320-19 58.66$ $ 52.08 $ 52.08
256-320-20 58.66$ $ 52.08 $ 52.08
256-320-21 58.66$ $ 52.08 $ 52.08
256-320-22 58.66$ $ 52.08 $ 52.08
256-320-23 58.66$ $ 52.08 $ 52.08
256-320-24 58.66$ $ 52.08 $ 52.08
256-320-25 58.66$ $ 52.08 $ 52.08
256-320-26 58.66$ $ 52.08 $ 52.08
256-320-27 58.66$ $ 52.08 $ 52.08
256-320-28 58.66$ $ 52.08 $ 52.08
256-320-29 58.66$ $ 52.08 $ 52.08
256-320-30 58.66$ $ 52.08 $ 52.08
256-320-31 58.66$ $ 52.08 $ 52.08
256-320-32 58.66$ $ 52.08 $ 52.08
256-320-33 58.66$ $ 52.08 $ 52.08
256-320-34 58.66$ $ 52.08 $ 52.08
256-320-35 58.66$ $ 52.08 $ 52.08
256-320-36 58.66$ $ 52.08 $ 52.08
256-320-37 58.66$ $ 52.08 $ 52.08
256-320-38 58.66$ $ 52.08 $ 52.08
256-320-39 58.66$ $ 52.08 $ 52.08
256-320-40 58.66$ $ 52.08 $ 52.08
256-320-41 58.66$ $ 52.08 $ 52.08
256-320-42 58.66$ $ 52.08 $ 52.08
256-330-01 58.66$ $ 52.08 $ 52.08
256-330-02 58.66$ $ 52.08 $ 52.08
256-330-03 58.66$ $ 52.08 $ 52.08
256-330-04 58.66$ $ 52.08 $ 52.08
11 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-330-05 58.66$ $ 52.08 $ 52.08
256-330-06 58.66$ $ 52.08 $ 52.08
256-330-07 58.66$ $ 52.08 $ 52.08
256-330-08 58.66$ $ 52.08 $ 52.08
256-330-09 58.66$ $ 52.08 $ 52.08
256-330-10 58.66$ $ 52.08 $ 52.08
256-330-11 58.66$ $ 52.08 $ 52.08
256-330-12 -$ $ - $ -
256-330-13 58.66$ $ 52.08 $ 52.08
256-330-14 58.66$ $ 52.08 $ 52.08
256-330-15 58.66$ $ 52.08 $ 52.08
256-330-16 58.66$ $ 52.08 $ 52.08
256-330-17 58.66$ $ 52.08 $ 52.08
256-330-18 58.66$ $ 52.08 $ 52.08
256-330-19 58.66$ $ 52.08 $ 52.08
256-330-20 58.66$ $ 52.08 $ 52.08
256-330-21 58.66$ $ 52.08 $ 52.08
256-330-22 58.66$ $ 52.08 $ 52.08
256-330-23 58.66$ $ 52.08 $ 52.08
256-330-24 58.66$ $ 52.08 $ 52.08
256-330-25 58.66$ $ 52.08 $ 52.08
256-330-26 58.66$ $ 52.08 $ 52.08
256-330-27 58.66$ $ 52.08 $ 52.08
256-330-28 58.66$ $ 52.08 $ 52.08
256-330-29 58.66$ $ 52.08 $ 52.08
256-330-30 58.66$ $ 52.08 $ 52.08
256-330-31 58.66$ $ 52.08 $ 52.08
256-330-32 58.66$ $ 52.08 $ 52.08
256-330-33 58.66$ $ 52.08 $ 52.08
256-330-34 58.66$ $ 52.08 $ 52.08
256-330-35 58.66$ $ 52.08 $ 52.08
256-330-36 58.66$ $ 52.08 $ 52.08
256-330-37 58.66$ $ 52.08 $ 52.08
256-330-38 58.66$ $ 52.08 $ 52.08
256-330-39 58.66$ $ 52.08 $ 52.08
256-330-40 58.66$ $ 52.08 $ 52.08
256-330-41 58.66$ $ 52.08 $ 52.08
256-330-42 58.66$ $ 52.08 $ 52.08
256-340-01 58.66$ $ 52.08 $ 52.08
256-340-02 58.66$ $ 52.08 $ 52.08
12 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-340-03 58.66$ $ 52.08 $ 52.08
256-340-04 58.66$ $ 52.08 $ 52.08
256-340-05 58.66$ $ 52.08 $ 52.08
256-340-06 58.66$ $ 52.08 $ 52.08
256-340-07 58.66$ $ 52.08 $ 52.08
256-340-08 58.66$ $ 52.08 $ 52.08
256-340-09 58.66$ $ 52.08 $ 52.08
256-340-10 58.66$ $ 52.08 $ 52.08
256-340-11 58.66$ $ 52.08 $ 52.08
256-340-12 58.66$ $ 52.08 $ 52.08
256-340-13 58.66$ $ 52.08 $ 52.08
256-340-14 58.66$ $ 52.08 $ 52.08
256-340-15 58.66$ $ 52.08 $ 52.08
256-340-16 58.66$ $ 52.08 $ 52.08
256-340-17 58.66$ $ 52.08 $ 52.08
256-340-18 58.66$ $ 52.08 $ 52.08
256-340-19 58.66$ $ 52.08 $ 52.08
256-340-20 58.66$ $ 52.08 $ 52.08
256-340-21 58.66$ $ 52.08 $ 52.08
256-340-22 58.66$ $ 52.08 $ 52.08
256-340-23 58.66$ $ 52.08 $ 52.08
256-340-24 58.66$ $ 52.08 $ 52.08
256-340-25 58.66$ $ 52.08 $ 52.08
256-340-26 58.66$ $ 52.08 $ 52.08
256-340-27 58.66$ $ 52.08 $ 52.08
256-340-28 58.66$ $ 52.08 $ 52.08
256-340-29 58.66$ $ 52.08 $ 52.08
256-340-30 58.66$ $ 52.08 $ 52.08
256-340-31 58.66$ $ 52.08 $ 52.08
256-340-32 58.66$ $ 52.08 $ 52.08
256-340-33 58.66$ $ 52.08 $ 52.08
256-340-34 58.66$ $ 52.08 $ 52.08
256-340-35 58.66$ $ 52.08 $ 52.08
256-340-36 58.66$ $ 52.08 $ 52.08
256-340-37 58.66$ $ 52.08 $ 52.08
256-340-38 58.66$ $ 52.08 $ 52.08
256-340-39 58.66$ $ 52.08 $ 52.08
256-340-40 58.66$ $ 52.08 $ 52.08
256-340-41 58.66$ $ 52.08 $ 52.08
256-340-42 58.66$ $ 52.08 $ 52.08
13 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-340-43 58.66$ $ 52.08 $ 52.08
256-340-44 58.66$ $ 52.08 $ 52.08
256-340-45 58.66$ $ 52.08 $ 52.08
256-340-46 58.66$ $ 52.08 $ 52.08
256-350-01 58.66$ $ 52.08 $ 52.08
256-350-02 58.66$ $ 52.08 $ 52.08
256-350-03 58.66$ $ 52.08 $ 52.08
256-350-04 58.66$ $ 52.08 $ 52.08
256-350-05 58.66$ $ 52.08 $ 52.08
256-350-06 58.66$ $ 52.08 $ 52.08
256-350-07 58.66$ $ 52.08 $ 52.08
256-350-08 58.66$ $ 52.08 $ 52.08
256-350-09 58.66$ $ 52.08 $ 52.08
256-350-10 58.66$ $ 52.08 $ 52.08
256-350-11 58.66$ $ 52.08 $ 52.08
256-350-12 58.66$ $ 52.08 $ 52.08
256-350-13 58.66$ $ 52.08 $ 52.08
256-350-14 58.66$ $ 52.08 $ 52.08
256-350-15 58.66$ $ 52.08 $ 52.08
256-350-16 58.66$ $ 52.08 $ 52.08
256-350-17 58.66$ $ 52.08 $ 52.08
256-350-18 58.66$ $ 52.08 $ 52.08
256-350-19 58.66$ $ 52.08 $ 52.08
256-350-20 58.66$ $ 52.08 $ 52.08
256-350-21 58.66$ $ 52.08 $ 52.08
256-350-22 58.66$ $ 52.08 $ 52.08
256-350-23 58.66$ $ 52.08 $ 52.08
256-350-24 58.66$ $ 52.08 $ 52.08
256-350-25 58.66$ $ 52.08 $ 52.08
256-350-26 58.66$ $ 52.08 $ 52.08
256-350-27 58.66$ $ 52.08 $ 52.08
256-350-28 58.66$ $ 52.08 $ 52.08
256-350-29 58.66$ $ 52.08 $ 52.08
256-350-30 58.66$ $ 52.08 $ 52.08
256-350-31 58.66$ $ 52.08 $ 52.08
256-350-32 58.66$ $ 52.08 $ 52.08
256-350-33 58.66$ $ 52.08 $ 52.08
256-350-34 58.66$ $ 52.08 $ 52.08
256-350-35 58.66$ $ 52.08 $ 52.08
256-350-36 58.66$ $ 52.08 $ 52.08
14 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-350-37 58.66$ $ 52.08 $ 52.08
256-350-38 58.66$ $ 52.08 $ 52.08
256-350-39 58.66$ $ 52.08 $ 52.08
256-350-40 58.66$ $ 52.08 $ 52.08
256-350-41 58.66$ $ 52.08 $ 52.08
256-350-42 58.66$ $ 52.08 $ 52.08
256-350-43 58.66$ $ 52.08 $ 52.08
256-350-44 58.66$ $ 52.08 $ 52.08
256-350-45 58.66$ $ 52.08 $ 52.08
256-350-46 58.66$ $ 52.08 $ 52.08
256-350-47 58.66$ $ 52.08 $ 52.08
256-350-48 58.66$ $ 52.08 $ 52.08
256-350-49 58.66$ $ 52.08 $ 52.08
256-350-50 58.66$ $ 52.08 $ 52.08
256-350-51 58.66$ $ 52.08 $ 52.08
256-350-52 58.66$ $ 52.08 $ 52.08
256-350-53 58.66$ $ 52.08 $ 52.08
256-350-54 58.66$ $ 52.08 $ 52.08
256-350-55 58.66$ $ 52.08 $ 52.08
256-350-56 58.66$ $ 52.08 $ 52.08
256-350-57 58.66$ $ 52.08 $ 52.08
256-350-58 58.66$ $ 52.08 $ 52.08
256-350-59 58.66$ $ 52.08 $ 52.08
256-350-60 58.66$ $ 52.08 $ 52.08
256-350-61 58.66$ $ 52.08 $ 52.08
256-360-01 58.66$ $ 52.08 $ 52.08
256-360-02 58.66$ $ 52.08 $ 52.08
256-360-03 58.66$ $ 52.08 $ 52.08
256-360-04 58.66$ $ 52.08 $ 52.08
256-360-05 58.66$ $ 52.08 $ 52.08
256-360-06 58.66$ $ 52.08 $ 52.08
256-360-07 58.66$ $ 52.08 $ 52.08
256-360-08 58.66$ $ 52.08 $ 52.08
256-360-09 58.66$ $ 52.08 $ 52.08
256-360-10 58.66$ $ 52.08 $ 52.08
256-360-11 58.66$ $ 52.08 $ 52.08
256-360-12 58.66$ $ 52.08 $ 52.08
256-360-13 58.66$ $ 52.08 $ 52.08
256-360-14 58.66$ $ 52.08 $ 52.08
256-360-15 58.66$ $ 52.08 $ 52.08
15 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-360-16 58.66$ $ 52.08 $ 52.08
256-360-17 58.66$ $ 52.08 $ 52.08
256-360-18 58.66$ $ 52.08 $ 52.08
256-360-19 58.66$ $ 52.08 $ 52.08
256-360-20 58.66$ $ 52.08 $ 52.08
256-360-21 58.66$ $ 52.08 $ 52.08
256-360-22 58.66$ $ 52.08 $ 52.08
256-360-23 58.66$ $ 52.08 $ 52.08
256-360-24 58.66$ $ 52.08 $ 52.08
256-360-25 58.66$ $ 52.08 $ 52.08
256-360-26 58.66$ $ 52.08 $ 52.08
256-360-27 58.66$ $ 52.08 $ 52.08
256-360-28 58.66$ $ 52.08 $ 52.08
256-360-29 58.66$ $ 52.08 $ 52.08
256-360-30 58.66$ $ 52.08 $ 52.08
256-360-31 58.66$ $ 52.08 $ 52.08
256-360-32 58.66$ $ 52.08 $ 52.08
256-360-33 58.66$ $ 52.08 $ 52.08
256-360-34 58.66$ $ 52.08 $ 52.08
256-360-35 58.66$ $ 52.08 $ 52.08
256-360-36 58.66$ $ 52.08 $ 52.08
256-360-37 58.66$ $ 52.08 $ 52.08
256-360-38 58.66$ $ 52.08 $ 52.08
256-360-39 58.66$ $ 52.08 $ 52.08
256-360-40 58.66$ $ 52.08 $ 52.08
256-360-41 58.66$ $ 52.08 $ 52.08
256-360-42 58.66$ $ 52.08 $ 52.08
256-360-43 58.66$ $ 52.08 $ 52.08
256-360-44 58.66$ $ 52.08 $ 52.08
256-360-45 58.66$ $ 52.08 $ 52.08
256-360-46 58.66$ $ 52.08 $ 52.08
256-360-47 58.66$ $ 52.08 $ 52.08
256-360-48 58.66$ $ 52.08 $ 52.08
256-360-49 58.66$ $ 52.08 $ 52.08
256-360-50 58.66$ $ 52.08 $ 52.08
256-370-01 58.66$ $ 52.08 $ 52.08
256-370-02 58.66$ $ 52.08 $ 52.08
256-370-03 58.66$ $ 52.08 $ 52.08
256-370-04 58.66$ $ 52.08 $ 52.08
256-370-06 58.66$ $ 52.08 $ 52.08
16 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-370-11 58.66$ $ 52.08 $ 52.08
256-370-12 58.66$ $ 52.08 $ 52.08
256-370-20 58.66$ $ 52.08 $ 52.08
256-370-21 58.66$ $ 52.08 $ 52.08
256-370-22 58.66$ $ 52.08 $ 52.08
256-370-26 58.66$ $ 52.08 $ 52.08
256-370-27 58.66$ $ 52.08 $ 52.08
256-370-28 58.66$ $ 52.08 $ 52.08
256-370-29 58.66$ $ 52.08 $ 52.08
256-370-30 58.66$ $ 52.08 $ 52.08
256-370-31 58.66$ $ 52.08 $ 52.08
256-370-32 58.66$ $ 52.08 $ 52.08
256-370-33 58.66$ $ 52.08 $ 52.08
256-370-34 58.66$ $ 52.08 $ 52.08
256-370-35 58.66$ $ 52.08 $ 52.08
256-370-36 58.66$ $ 52.08 $ 52.08
256-370-37 58.66$ $ 52.08 $ 52.08
256-370-38 58.66$ $ 52.08 $ 52.08
256-370-39 58.66$ $ 52.08 $ 52.08
256-370-40 58.66$ $ 52.08 $ 52.08
256-370-41 58.66$ $ 52.08 $ 52.08
256-370-42 58.66$ $ 52.08 $ 52.08
256-370-43 58.66$ $ 52.08 $ 52.08
256-370-44 58.66$ $ 52.08 $ 52.08
256-370-45 58.66$ $ 52.08 $ 52.08
256-370-46 58.66$ $ 52.08 $ 52.08
256-370-47 58.66$ $ 52.08 $ 52.08
256-370-48 58.66$ $ 52.08 $ 52.08
256-370-49 58.66$ $ 52.08 $ 52.08
256-370-50 58.66$ $ 52.08 $ 52.08
256-370-51 58.66$ $ 52.08 $ 52.08
256-370-52 58.66$ $ 52.08 $ 52.08
256-370-53 58.66$ $ 52.08 $ 52.08
256-370-54 58.66$ $ 52.08 $ 52.08
256-370-55 58.66$ $ 52.08 $ 52.08
256-370-56 58.66$ $ 52.08 $ 52.08
256-370-57 58.66$ $ 52.08 $ 52.08
256-370-58 58.66$ $ 52.08 $ 52.08
256-370-59 58.66$ $ 52.08 $ 52.08
256-370-60 58.66$ $ 52.08 $ 52.08
17 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-370-61 58.66$ $ 52.08 $ 52.08
256-370-62 58.66$ $ 52.08 $ 52.08
256-380-01 58.66$ $ 52.08 $ 52.08
256-380-02 58.66$ $ 52.08 $ 52.08
256-380-03 58.66$ $ 52.08 $ 52.08
256-380-04 58.66$ $ 52.08 $ 52.08
256-380-05 58.66$ $ 52.08 $ 52.08
256-380-06 58.66$ $ 52.08 $ 52.08
256-380-07 58.66$ $ 52.08 $ 52.08
256-380-08 58.66$ $ 52.08 $ 52.08
256-380-09 58.66$ $ 52.08 $ 52.08
256-380-10 58.66$ $ 52.08 $ 52.08
256-380-11 58.66$ $ 52.08 $ 52.08
256-380-12 58.66$ $ 52.08 $ 52.08
256-380-13 58.66$ $ 52.08 $ 52.08
256-380-14 58.66$ $ 52.08 $ 52.08
256-380-15 58.66$ $ 52.08 $ 52.08
256-380-16 58.66$ $ 52.08 $ 52.08
256-380-17 58.66$ $ 52.08 $ 52.08
256-380-18 58.66$ $ 52.08 $ 52.08
256-380-19 58.66$ $ 52.08 $ 52.08
256-380-20 58.66$ $ 52.08 $ 52.08
256-380-21 58.66$ $ 52.08 $ 52.08
256-380-22 58.66$ $ 52.08 $ 52.08
256-380-23 58.66$ $ 52.08 $ 52.08
256-380-24 58.66$ $ 52.08 $ 52.08
256-380-25 58.66$ $ 52.08 $ 52.08
256-380-26 58.66$ $ 52.08 $ 52.08
256-380-27 58.66$ $ 52.08 $ 52.08
256-380-28 58.66$ $ 52.08 $ 52.08
256-380-29 58.66$ $ 52.08 $ 52.08
256-380-30 58.66$ $ 52.08 $ 52.08
256-380-31 58.66$ $ 52.08 $ 52.08
256-380-32 58.66$ $ 52.08 $ 52.08
256-380-33 58.66$ $ 52.08 $ 52.08
256-380-34 58.66$ $ 52.08 $ 52.08
256-380-35 58.66$ $ 52.08 $ 52.08
256-380-36 58.66$ $ 52.08 $ 52.08
256-380-37 58.66$ $ 52.08 $ 52.08
256-380-38 58.66$ $ 52.08 $ 52.08
18 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-380-39 58.66$ $ 52.08 $ 52.08
256-380-40 58.66$ $ 52.08 $ 52.08
256-380-41 58.66$ $ 52.08 $ 52.08
256-380-42 58.66$ $ 52.08 $ 52.08
256-380-43 58.66$ $ 52.08 $ 52.08
256-380-44 58.66$ $ 52.08 $ 52.08
256-380-45 58.66$ $ 52.08 $ 52.08
256-380-46 58.66$ $ 52.08 $ 52.08
256-380-47 58.66$ $ 52.08 $ 52.08
256-380-48 58.66$ $ 52.08 $ 52.08
256-380-49 58.66$ $ 52.08 $ 52.08
256-380-50 58.66$ $ 52.08 $ 52.08
256-380-51 58.66$ $ 52.08 $ 52.08
256-380-52 58.66$ $ 52.08 $ 52.08
256-380-53 58.66$ $ 52.08 $ 52.08
256-380-54 58.66$ $ 52.08 $ 52.08
256-380-55 58.66$ $ 52.08 $ 52.08
256-380-56 58.66$ $ 52.08 $ 52.08
256-380-57 58.66$ $ 52.08 $ 52.08
256-380-58 58.66$ $ 52.08 $ 52.08
256-380-59 58.66$ $ 52.08 $ 52.08
256-380-60 58.66$ $ 52.08 $ 52.08
256-380-61 58.66$ $ 52.08 $ 52.08
256-380-62 58.66$ $ 52.08 $ 52.08
256-380-63 58.66$ $ 52.08 $ 52.08
256-380-64 58.66$ $ 52.08 $ 52.08
256-380-65 58.66$ $ 52.08 $ 52.08
256-380-66 58.66$ $ 52.08 $ 52.08
256-380-67 58.66$ $ 52.08 $ 52.08
256-380-68 -$ $ - $ -
256-380-69 -$ $ - $ -
256-380-70 -$ $ - $ -
256-420-01 58.66$ $ 52.08 $ 52.08
256-420-02 58.66$ $ 52.08 $ 52.08
256-420-03 58.66$ $ 52.08 $ 52.08
256-420-04 58.66$ $ 52.08 $ 52.08
256-420-05 58.66$ $ 52.08 $ 52.08
256-420-06 58.66$ $ 52.08 $ 52.08
256-420-07 58.66$ $ 52.08 $ 52.08
256-420-08 58.66$ $ 52.08 $ 52.08
19 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-420-09 58.66$ $ 52.08 $ 52.08
256-420-10 58.66$ $ 52.08 $ 52.08
256-420-11 58.66$ $ 52.08 $ 52.08
256-420-12 58.66$ $ 52.08 $ 52.08
256-420-13 58.66$ $ 52.08 $ 52.08
256-420-14 58.66$ $ 52.08 $ 52.08
256-420-15 58.66$ $ 52.08 $ 52.08
256-420-16 58.66$ $ 52.08 $ 52.08
256-420-17 58.66$ $ 52.08 $ 52.08
256-420-18 58.66$ $ 52.08 $ 52.08
256-420-19 58.66$ $ 52.08 $ 52.08
256-420-20 58.66$ $ 52.08 $ 52.08
256-420-21 58.66$ $ 52.08 $ 52.08
256-420-22 58.66$ $ 52.08 $ 52.08
256-420-23 58.66$ $ 52.08 $ 52.08
256-420-24 58.66$ $ 52.08 $ 52.08
256-420-25 58.66$ $ 52.08 $ 52.08
256-420-26 58.66$ $ 52.08 $ 52.08
256-420-27 58.66$ $ 52.08 $ 52.08
256-420-28 58.66$ $ 52.08 $ 52.08
256-420-29 58.66$ $ 52.08 $ 52.08
256-420-30 58.66$ $ 52.08 $ 52.08
256-420-31 58.66$ $ 52.08 $ 52.08
256-420-32 58.66$ $ 52.08 $ 52.08
256-420-33 58.66$ $ 52.08 $ 52.08
256-420-34 58.66$ $ 52.08 $ 52.08
256-420-35 58.66$ $ 52.08 $ 52.08
256-420-36 58.66$ $ 52.08 $ 52.08
256-420-37 58.66$ $ 52.08 $ 52.08
256-420-38 -$ $ - $ -
256-430-01 58.66$ $ 52.08 $ 52.08
256-430-02 58.66$ $ 52.08 $ 52.08
256-430-03 58.66$ $ 52.08 $ 52.08
256-430-04 58.66$ $ 52.08 $ 52.08
256-430-05 58.66$ $ 52.08 $ 52.08
256-430-06 58.66$ $ 52.08 $ 52.08
256-430-07 58.66$ $ 52.08 $ 52.08
256-430-08 58.66$ $ 52.08 $ 52.08
256-430-09 58.66$ $ 52.08 $ 52.08
256-430-10 58.66$ $ 52.08 $ 52.08
20 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-430-11 58.66$ $ 52.08 $ 52.08
256-430-12 58.66$ $ 52.08 $ 52.08
256-430-13 58.66$ $ 52.08 $ 52.08
256-430-14 58.66$ $ 52.08 $ 52.08
256-430-15 58.66$ $ 52.08 $ 52.08
256-430-16 58.66$ $ 52.08 $ 52.08
256-430-17 58.66$ $ 52.08 $ 52.08
256-430-18 58.66$ $ 52.08 $ 52.08
256-430-19 58.66$ $ 52.08 $ 52.08
256-430-20 58.66$ $ 52.08 $ 52.08
256-430-21 58.66$ $ 52.08 $ 52.08
256-430-22 58.66$ $ 52.08 $ 52.08
256-430-23 58.66$ $ 52.08 $ 52.08
256-430-24 58.66$ $ 52.08 $ 52.08
256-430-25 58.66$ $ 52.08 $ 52.08
256-430-26 58.66$ $ 52.08 $ 52.08
256-430-27 58.66$ $ 52.08 $ 52.08
256-430-28 58.66$ $ 52.08 $ 52.08
256-430-29 58.66$ $ 52.08 $ 52.08
256-430-30 58.66$ $ 52.08 $ 52.08
256-430-31 58.66$ $ 52.08 $ 52.08
256-430-32 58.66$ $ 52.08 $ 52.08
256-430-33 58.66$ $ 52.08 $ 52.08
256-430-34 58.66$ $ 52.08 $ 52.08
256-430-35 58.66$ $ 52.08 $ 52.08
256-430-36 58.66$ $ 52.08 $ 52.08
256-430-37 58.66$ $ 52.08 $ 52.08
256-430-38 58.66$ $ 52.08 $ 52.08
256-430-39 58.66$ $ 52.08 $ 52.08
256-430-40 58.66$ $ 52.08 $ 52.08
256-430-41 58.66$ $ 52.08 $ 52.08
256-430-42 58.66$ $ 52.08 $ 52.08
256-430-43 58.66$ $ 52.08 $ 52.08
256-430-44 58.66$ $ 52.08 $ 52.08
256-430-45 58.66$ $ 52.08 $ 52.08
256-430-46 58.66$ $ 52.08 $ 52.08
256-430-47 58.66$ $ 52.08 $ 52.08
256-430-48 58.66$ $ 52.08 $ 52.08
256-430-49 58.66$ $ 52.08 $ 52.08
256-430-50 58.66$ $ 52.08 $ 52.08
21 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-430-51 58.66$ $ 52.08 $ 52.08
256-430-52 58.66$ $ 52.08 $ 52.08
256-430-53 58.66$ $ 52.08 $ 52.08
256-430-54 58.66$ $ 52.08 $ 52.08
256-430-55 58.66$ $ 52.08 $ 52.08
256-430-56 58.66$ $ 52.08 $ 52.08
256-430-57 -$ $ - $ -
256-440-01 58.66$ $ 52.08 $ 52.08
256-440-02 58.66$ $ 52.08 $ 52.08
256-440-03 58.66$ $ 52.08 $ 52.08
256-440-04 58.66$ $ 52.08 $ 52.08
256-440-05 58.66$ $ 52.08 $ 52.08
256-440-06 58.66$ $ 52.08 $ 52.08
256-440-07 58.66$ $ 52.08 $ 52.08
256-440-08 58.66$ $ 52.08 $ 52.08
256-440-09 58.66$ $ 52.08 $ 52.08
256-440-10 58.66$ $ 52.08 $ 52.08
256-440-11 58.66$ $ 52.08 $ 52.08
256-440-12 58.66$ $ 52.08 $ 52.08
256-440-13 58.66$ $ 52.08 $ 52.08
256-440-14 58.66$ $ 52.08 $ 52.08
256-440-15 58.66$ $ 52.08 $ 52.08
256-440-16 58.66$ $ 52.08 $ 52.08
256-440-17 58.66$ $ 52.08 $ 52.08
256-440-18 58.66$ $ 52.08 $ 52.08
256-440-19 58.66$ $ 52.08 $ 52.08
256-440-20 58.66$ $ 52.08 $ 52.08
256-440-21 58.66$ $ 52.08 $ 52.08
256-440-22 58.66$ $ 52.08 $ 52.08
256-440-23 58.66$ $ 52.08 $ 52.08
256-440-24 58.66$ $ 52.08 $ 52.08
256-440-25 58.66$ $ 52.08 $ 52.08
256-440-26 58.66$ $ 52.08 $ 52.08
256-440-27 58.66$ $ 52.08 $ 52.08
256-440-28 58.66$ $ 52.08 $ 52.08
256-440-29 58.66$ $ 52.08 $ 52.08
256-440-30 58.66$ $ 52.08 $ 52.08
256-440-31 58.66$ $ 52.08 $ 52.08
256-440-32 58.66$ $ 52.08 $ 52.08
256-440-33 58.66$ $ 52.08 $ 52.08
22 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-440-34 58.66$ $ 52.08 $ 52.08
256-440-35 58.66$ $ 52.08 $ 52.08
256-440-36 58.66$ $ 52.08 $ 52.08
256-440-37 58.66$ $ 52.08 $ 52.08
256-440-38 58.66$ $ 52.08 $ 52.08
256-440-39 58.66$ $ 52.08 $ 52.08
256-440-40 58.66$ $ 52.08 $ 52.08
256-440-41 58.66$ $ 52.08 $ 52.08
256-440-42 58.66$ $ 52.08 $ 52.08
256-440-43 58.66$ $ 52.08 $ 52.08
256-440-44 58.66$ $ 52.08 $ 52.08
256-440-45 58.66$ $ 52.08 $ 52.08
256-440-46 58.66$ $ 52.08 $ 52.08
256-440-47 58.66$ $ 52.08 $ 52.08
256-440-48 58.66$ $ 52.08 $ 52.08
256-440-49 58.66$ $ 52.08 $ 52.08
256-440-50 58.66$ $ 52.08 $ 52.08
256-440-51 58.66$ $ 52.08 $ 52.08
256-440-52 58.66$ $ 52.08 $ 52.08
256-440-53 58.66$ $ 52.08 $ 52.08
256-440-54 58.66$ $ 52.08 $ 52.08
256-440-55 58.66$ $ 52.08 $ 52.08
256-440-56 58.66$ $ 52.08 $ 52.08
256-440-57 58.66$ $ 52.08 $ 52.08
256-440-58 58.66$ $ 52.08 $ 52.08
256-440-59 58.66$ $ 52.08 $ 52.08
256-440-60 58.66$ $ 52.08 $ 52.08
256-440-61 58.66$ $ 52.08 $ 52.08
256-440-62 58.66$ $ 52.08 $ 52.08
256-440-63 -$ $ - $ -
256-450-01 58.66$ $ 52.08 $ 52.08
256-450-02 58.66$ $ 52.08 $ 52.08
256-450-03 58.66$ $ 52.08 $ 52.08
256-450-04 58.66$ $ 52.08 $ 52.08
256-450-05 58.66$ $ 52.08 $ 52.08
256-450-06 58.66$ $ 52.08 $ 52.08
256-450-07 58.66$ $ 52.08 $ 52.08
256-450-08 58.66$ $ 52.08 $ 52.08
256-450-09 58.66$ $ 52.08 $ 52.08
256-450-10 58.66$ $ 52.08 $ 52.08
23 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-450-11 58.66$ $ 52.08 $ 52.08
256-450-12 58.66$ $ 52.08 $ 52.08
256-450-13 58.66$ $ 52.08 $ 52.08
256-450-14 58.66$ $ 52.08 $ 52.08
256-450-15 58.66$ $ 52.08 $ 52.08
256-450-16 58.66$ $ 52.08 $ 52.08
256-450-17 58.66$ $ 52.08 $ 52.08
256-450-18 58.66$ $ 52.08 $ 52.08
256-450-19 58.66$ $ 52.08 $ 52.08
256-450-20 58.66$ $ 52.08 $ 52.08
256-450-21 58.66$ $ 52.08 $ 52.08
256-450-22 58.66$ $ 52.08 $ 52.08
256-450-23 58.66$ $ 52.08 $ 52.08
256-450-24 58.66$ $ 52.08 $ 52.08
256-450-25 58.66$ $ 52.08 $ 52.08
256-450-26 58.66$ $ 52.08 $ 52.08
256-450-27 58.66$ $ 52.08 $ 52.08
256-450-28 58.66$ $ 52.08 $ 52.08
256-450-29 58.66$ $ 52.08 $ 52.08
256-450-30 58.66$ $ 52.08 $ 52.08
256-450-31 58.66$ $ 52.08 $ 52.08
256-450-32 58.66$ $ 52.08 $ 52.08
256-450-33 58.66$ $ 52.08 $ 52.08
256-450-34 58.66$ $ 52.08 $ 52.08
256-450-35 58.66$ $ 52.08 $ 52.08
256-450-36 58.66$ $ 52.08 $ 52.08
256-450-37 58.66$ $ 52.08 $ 52.08
256-450-38 -$ $ - $ -
256-460-01 58.66$ $ 52.08 $ 52.08
256-460-02 58.66$ $ 52.08 $ 52.08
256-460-03 58.66$ $ 52.08 $ 52.08
256-460-04 58.66$ $ 52.08 $ 52.08
256-460-05 58.66$ $ 52.08 $ 52.08
256-460-06 58.66$ $ 52.08 $ 52.08
256-460-07 58.66$ $ 52.08 $ 52.08
256-460-08 58.66$ $ 52.08 $ 52.08
256-460-09 58.66$ $ 52.08 $ 52.08
256-460-10 58.66$ $ 52.08 $ 52.08
256-460-11 58.66$ $ 52.08 $ 52.08
256-460-12 58.66$ $ 52.08 $ 52.08
24 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-460-13 58.66$ $ 52.08 $ 52.08
256-460-14 58.66$ $ 52.08 $ 52.08
256-460-15 58.66$ $ 52.08 $ 52.08
256-460-16 58.66$ $ 52.08 $ 52.08
256-460-17 58.66$ $ 52.08 $ 52.08
256-460-18 58.66$ $ 52.08 $ 52.08
256-460-19 58.66$ $ 52.08 $ 52.08
256-460-20 58.66$ $ 52.08 $ 52.08
256-460-21 58.66$ $ 52.08 $ 52.08
256-460-22 58.66$ $ 52.08 $ 52.08
256-460-23 58.66$ $ 52.08 $ 52.08
256-460-24 58.66$ $ 52.08 $ 52.08
256-460-25 58.66$ $ 52.08 $ 52.08
256-460-26 58.66$ $ 52.08 $ 52.08
256-460-27 58.66$ $ 52.08 $ 52.08
256-460-28 58.66$ $ 52.08 $ 52.08
256-460-29 58.66$ $ 52.08 $ 52.08
256-460-30 58.66$ $ 52.08 $ 52.08
256-460-31 58.66$ $ 52.08 $ 52.08
256-460-32 -$ $ - $ -
256-470-01 58.66$ $ 52.08 $ 52.08
256-470-02 58.66$ $ 52.08 $ 52.08
256-470-03 58.66$ $ 52.08 $ 52.08
256-470-04 58.66$ $ 52.08 $ 52.08
256-470-05 58.66$ $ 52.08 $ 52.08
256-470-06 58.66$ $ 52.08 $ 52.08
256-470-07 58.66$ $ 52.08 $ 52.08
256-470-08 58.66$ $ 52.08 $ 52.08
256-470-09 58.66$ $ 52.08 $ 52.08
256-470-10 58.66$ $ 52.08 $ 52.08
256-470-11 58.66$ $ 52.08 $ 52.08
256-470-12 58.66$ $ 52.08 $ 52.08
256-470-13 58.66$ $ 52.08 $ 52.08
256-470-14 58.66$ $ 52.08 $ 52.08
256-470-15 58.66$ $ 52.08 $ 52.08
256-470-16 58.66$ $ 52.08 $ 52.08
256-470-17 58.66$ $ 52.08 $ 52.08
256-470-18 58.66$ $ 52.08 $ 52.08
256-470-19 58.66$ $ 52.08 $ 52.08
256-470-20 58.66$ $ 52.08 $ 52.08
25 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-470-21 58.66$ $ 52.08 $ 52.08
256-470-22 58.66$ $ 52.08 $ 52.08
256-470-23 58.66$ $ 52.08 $ 52.08
256-470-24 58.66$ $ 52.08 $ 52.08
256-470-25 58.66$ $ 52.08 $ 52.08
256-470-26 58.66$ $ 52.08 $ 52.08
256-470-27 58.66$ $ 52.08 $ 52.08
256-470-28 58.66$ $ 52.08 $ 52.08
256-470-29 58.66$ $ 52.08 $ 52.08
256-470-30 58.66$ $ 52.08 $ 52.08
256-470-31 58.66$ $ 52.08 $ 52.08
256-470-32 58.66$ $ 52.08 $ 52.08
256-470-33 58.66$ $ 52.08 $ 52.08
256-470-34 58.66$ $ 52.08 $ 52.08
256-470-35 58.66$ $ 52.08 $ 52.08
256-470-36 58.66$ $ 52.08 $ 52.08
256-470-37 58.66$ $ 52.08 $ 52.08
256-470-38 58.66$ $ 52.08 $ 52.08
256-470-39 58.66$ $ 52.08 $ 52.08
256-470-40 58.66$ $ 52.08 $ 52.08
256-470-41 58.66$ $ 52.08 $ 52.08
256-470-42 58.66$ $ 52.08 $ 52.08
256-470-43 58.66$ $ 52.08 $ 52.08
256-470-44 58.66$ $ 52.08 $ 52.08
256-470-45 58.66$ $ 52.08 $ 52.08
256-470-46 58.66$ $ 52.08 $ 52.08
256-470-47 58.66$ $ 52.08 $ 52.08
256-470-48 58.66$ $ 52.08 $ 52.08
256-480-01 58.66$ $ 52.08 $ 52.08
256-480-02 58.66$ $ 52.08 $ 52.08
256-480-03 58.66$ $ 52.08 $ 52.08
256-480-04 58.66$ $ 52.08 $ 52.08
256-480-05 58.66$ $ 52.08 $ 52.08
256-480-06 58.66$ $ 52.08 $ 52.08
256-480-07 58.66$ $ 52.08 $ 52.08
256-480-08 58.66$ $ 52.08 $ 52.08
256-480-09 58.66$ $ 52.08 $ 52.08
256-480-10 58.66$ $ 52.08 $ 52.08
256-480-11 58.66$ $ 52.08 $ 52.08
256-480-12 58.66$ $ 52.08 $ 52.08
26 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-480-13 58.66$ $ 52.08 $ 52.08
256-480-14 58.66$ $ 52.08 $ 52.08
256-480-15 58.66$ $ 52.08 $ 52.08
256-480-16 58.66$ $ 52.08 $ 52.08
256-480-17 58.66$ $ 52.08 $ 52.08
256-480-18 58.66$ $ 52.08 $ 52.08
256-480-19 58.66$ $ 52.08 $ 52.08
256-480-20 58.66$ $ 52.08 $ 52.08
256-480-21 58.66$ $ 52.08 $ 52.08
256-480-22 58.66$ $ 52.08 $ 52.08
256-480-23 58.66$ $ 52.08 $ 52.08
256-480-24 58.66$ $ 52.08 $ 52.08
256-480-25 58.66$ $ 52.08 $ 52.08
256-480-26 58.66$ $ 52.08 $ 52.08
256-480-27 58.66$ $ 52.08 $ 52.08
256-480-28 58.66$ $ 52.08 $ 52.08
256-480-29 58.66$ $ 52.08 $ 52.08
256-480-30 58.66$ $ 52.08 $ 52.08
256-480-31 58.66$ $ 52.08 $ 52.08
256-480-32 58.66$ $ 52.08 $ 52.08
256-480-33 58.66$ $ 52.08 $ 52.08
256-480-34 58.66$ $ 52.08 $ 52.08
256-480-35 58.66$ $ 52.08 $ 52.08
256-480-36 58.66$ $ 52.08 $ 52.08
256-480-37 58.66$ $ 52.08 $ 52.08
256-480-38 58.66$ $ 52.08 $ 52.08
256-480-39 58.66$ $ 52.08 $ 52.08
256-480-40 58.66$ $ 52.08 $ 52.08
256-490-01 58.66$ $ 52.08 $ 52.08
256-490-02 58.66$ $ 52.08 $ 52.08
256-490-03 58.66$ $ 52.08 $ 52.08
256-490-04 58.66$ $ 52.08 $ 52.08
256-490-05 58.66$ $ 52.08 $ 52.08
256-490-06 58.66$ $ 52.08 $ 52.08
256-490-07 58.66$ $ 52.08 $ 52.08
256-490-08 58.66$ $ 52.08 $ 52.08
256-490-09 58.66$ $ 52.08 $ 52.08
256-490-10 58.66$ $ 52.08 $ 52.08
256-490-11 58.66$ $ 52.08 $ 52.08
256-490-12 58.66$ $ 52.08 $ 52.08
27 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-490-13 58.66$ $ 52.08 $ 52.08
256-490-14 58.66$ $ 52.08 $ 52.08
256-490-15 58.66$ $ 52.08 $ 52.08
256-490-16 58.66$ $ 52.08 $ 52.08
256-490-17 58.66$ $ 52.08 $ 52.08
256-490-18 58.66$ $ 52.08 $ 52.08
256-490-19 58.66$ $ 52.08 $ 52.08
256-490-20 58.66$ $ 52.08 $ 52.08
256-490-21 58.66$ $ 52.08 $ 52.08
256-490-22 58.66$ $ 52.08 $ 52.08
256-490-23 58.66$ $ 52.08 $ 52.08
256-490-24 58.66$ $ 52.08 $ 52.08
256-490-25 58.66$ $ 52.08 $ 52.08
256-490-26 58.66$ $ 52.08 $ 52.08
256-490-27 58.66$ $ 52.08 $ 52.08
256-490-28 58.66$ $ 52.08 $ 52.08
256-490-29 58.66$ $ 52.08 $ 52.08
256-500-03 -$ $ - $ -
256-500-04 -$ $ - $ -
256-500-05 -$ $ - $ -
256-530-01 58.66$ $ 52.08 $ 52.08
256-530-02 58.66$ $ 52.08 $ 52.08
256-530-03 58.66$ $ 52.08 $ 52.08
256-530-04 58.66$ $ 52.08 $ 52.08
256-530-05 58.66$ $ 52.08 $ 52.08
256-530-06 58.66$ $ 52.08 $ 52.08
256-530-07 58.66$ $ 52.08 $ 52.08
256-530-08 58.66$ $ 52.08 $ 52.08
256-530-09 58.66$ $ 52.08 $ 52.08
256-530-10 58.66$ $ 52.08 $ 52.08
256-530-11 58.66$ $ 52.08 $ 52.08
256-530-12 58.66$ $ 52.08 $ 52.08
256-530-13 58.66$ $ 52.08 $ 52.08
256-530-14 58.66$ $ 52.08 $ 52.08
256-530-15 58.66$ $ 52.08 $ 52.08
256-530-16 58.66$ $ 52.08 $ 52.08
256-530-17 58.66$ $ 52.08 $ 52.08
256-530-18 58.66$ $ 52.08 $ 52.08
256-530-19 58.66$ $ 52.08 $ 52.08
256-530-20 58.66$ $ 52.08 $ 52.08
28 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-530-21 58.66$ $ 52.08 $ 52.08
256-530-22 58.66$ $ 52.08 $ 52.08
256-530-23 58.66$ $ 52.08 $ 52.08
256-530-24 58.66$ $ 52.08 $ 52.08
256-530-25 58.66$ $ 52.08 $ 52.08
256-530-26 58.66$ $ 52.08 $ 52.08
256-530-27 58.66$ $ 52.08 $ 52.08
256-530-28 58.66$ $ 52.08 $ 52.08
256-530-29 58.66$ $ 52.08 $ 52.08
256-530-30 58.66$ $ 52.08 $ 52.08
256-530-31 58.66$ $ 52.08 $ 52.08
256-530-32 58.66$ $ 52.08 $ 52.08
256-530-33 58.66$ $ 52.08 $ 52.08
256-530-34 58.66$ $ 52.08 $ 52.08
256-530-35 58.66$ $ 52.08 $ 52.08
256-530-36 58.66$ $ 52.08 $ 52.08
256-530-37 58.66$ $ 52.08 $ 52.08
256-530-38 58.66$ $ 52.08 $ 52.08
256-530-39 58.66$ $ 52.08 $ 52.08
256-530-40 58.66$ $ 52.08 $ 52.08
256-530-41 58.66$ $ 52.08 $ 52.08
256-530-42 58.66$ $ 52.08 $ 52.08
256-530-43 58.66$ $ 52.08 $ 52.08
256-530-44 58.66$ $ 52.08 $ 52.08
256-530-45 58.66$ $ 52.08 $ 52.08
256-530-46 58.66$ $ 52.08 $ 52.08
256-530-47 58.66$ $ 52.08 $ 52.08
256-530-48 58.66$ $ 52.08 $ 52.08
256-530-49 58.66$ $ 52.08 $ 52.08
256-530-50 58.66$ $ 52.08 $ 52.08
256-530-51 58.66$ $ 52.08 $ 52.08
256-530-52 58.66$ $ 52.08 $ 52.08
256-530-53 58.66$ $ 52.08 $ 52.08
256-530-54 58.66$ $ 52.08 $ 52.08
256-530-55 58.66$ $ 52.08 $ 52.08
256-530-56 58.66$ $ 52.08 $ 52.08
256-530-57 58.66$ $ 52.08 $ 52.08
256-530-58 58.66$ $ 52.08 $ 52.08
256-530-59 58.66$ $ 52.08 $ 52.08
256-530-60 58.66$ $ 52.08 $ 52.08
29 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-530-61 58.66$ $ 52.08 $ 52.08
256-530-62 58.66$ $ 52.08 $ 52.08
256-530-63 58.66$ $ 52.08 $ 52.08
256-530-64 58.66$ $ 52.08 $ 52.08
256-530-65 58.66$ $ 52.08 $ 52.08
256-530-66 58.66$ $ 52.08 $ 52.08
256-530-67 58.66$ $ 52.08 $ 52.08
256-530-68 58.66$ $ 52.08 $ 52.08
256-530-69 58.66$ $ 52.08 $ 52.08
256-530-70 -$ $ - $ -
256-530-71 -$ $ - $ -
256-530-72 -$ $ - $ -
256-530-73 -$ $ - $ -
256-530-74 -$ $ - $ -
256-530-75 -$ $ - $ -
256-530-76 -$ $ - $ -
256-530-77 -$ $ - $ -
256-530-78 -$ $ - $ -
256-530-79 -$ $ - $ -
256-530-80 -$ $ - $ -
256-530-81 -$ $ - $ -
256-530-82 -$ $ - $ -
256-530-83 -$ $ - $ -
256-530-84 -$ $ - $ -
256-530-85 -$ $ - $ -
256-530-86 -$ $ - $ -
256-530-87 -$ $ - $ -
256-540-01 58.66$ $ 52.08 $ 52.08
256-540-02 58.66$ $ 52.08 $ 52.08
256-540-03 58.66$ $ 52.08 $ 52.08
256-540-04 58.66$ $ 52.08 $ 52.08
256-540-05 58.66$ $ 52.08 $ 52.08
256-540-06 58.66$ $ 52.08 $ 52.08
256-540-07 58.66$ $ 52.08 $ 52.08
256-540-08 58.66$ $ 52.08 $ 52.08
256-540-09 58.66$ $ 52.08 $ 52.08
256-540-10 58.66$ $ 52.08 $ 52.08
256-540-11 58.66$ $ 52.08 $ 52.08
256-540-12 58.66$ $ 52.08 $ 52.08
256-540-13 58.66$ $ 52.08 $ 52.08
30 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-540-14 58.66$ $ 52.08 $ 52.08
256-540-15 58.66$ $ 52.08 $ 52.08
256-540-16 58.66$ $ 52.08 $ 52.08
256-540-17 58.66$ $ 52.08 $ 52.08
256-540-18 58.66$ $ 52.08 $ 52.08
256-540-19 58.66$ $ 52.08 $ 52.08
256-540-20 58.66$ $ 52.08 $ 52.08
256-540-21 58.66$ $ 52.08 $ 52.08
256-540-22 58.66$ $ 52.08 $ 52.08
256-540-23 58.66$ $ 52.08 $ 52.08
256-540-24 58.66$ $ 52.08 $ 52.08
256-540-25 58.66$ $ 52.08 $ 52.08
256-540-26 58.66$ $ 52.08 $ 52.08
256-540-27 58.66$ $ 52.08 $ 52.08
256-540-28 58.66$ $ 52.08 $ 52.08
256-540-29 58.66$ $ 52.08 $ 52.08
256-540-30 58.66$ $ 52.08 $ 52.08
256-540-31 58.66$ $ 52.08 $ 52.08
256-540-32 58.66$ $ 52.08 $ 52.08
256-540-33 58.66$ $ 52.08 $ 52.08
256-540-34 58.66$ $ 52.08 $ 52.08
256-540-35 58.66$ $ 52.08 $ 52.08
256-540-36 58.66$ $ 52.08 $ 52.08
256-540-37 58.66$ $ 52.08 $ 52.08
256-540-38 58.66$ $ 52.08 $ 52.08
256-540-39 58.66$ $ 52.08 $ 52.08
256-540-40 58.66$ $ 52.08 $ 52.08
256-540-41 58.66$ $ 52.08 $ 52.08
256-540-42 58.66$ $ 52.08 $ 52.08
256-540-43 58.66$ $ 52.08 $ 52.08
256-540-44 58.66$ $ 52.08 $ 52.08
256-540-45 58.66$ $ 52.08 $ 52.08
256-540-46 58.66$ $ 52.08 $ 52.08
256-540-47 58.66$ $ 52.08 $ 52.08
256-540-48 58.66$ $ 52.08 $ 52.08
256-540-49 58.66$ $ 52.08 $ 52.08
256-540-50 58.66$ $ 52.08 $ 52.08
256-540-51 58.66$ $ 52.08 $ 52.08
256-540-52 58.66$ $ 52.08 $ 52.08
256-540-53 58.66$ $ 52.08 $ 52.08
31 ATTACHMENT E
Item 8.1
Mountain House LMD
Zone 1 Questa Neighborhood H
Assessment District No. 2008-1
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
256-540-54 58.66$ $ 52.08 $ 52.08
256-540-55 58.66$ $ 52.08 $ 52.08
256-540-56 58.66$ $ 52.08 $ 52.08
256-540-57 58.66$ $ 52.08 $ 52.08
256-540-58 58.66$ $ 52.08 $ 52.08
256-540-59 58.66$ $ 52.08 $ 52.08
256-540-60 58.66$ $ 52.08 $ 52.08
256-540-61 58.66$ $ 52.08 $ 52.08
256-540-62 58.66$ $ 52.08 $ 52.08
256-540-63 58.66$ $ 52.08 $ 52.08
256-540-64 58.66$ $ 52.08 $ 52.08
256-540-65 58.66$ $ 52.08 $ 52.08
256-540-66 58.66$ $ 52.08 $ 52.08
256-540-67 58.66$ $ 52.08 $ 52.08
256-540-68 58.66$ $ 52.08 $ 52.08
256-540-69 -$ $ - $ -
256-540-70 -$ $ - $ -
256-540-71 -$ $ - $ -
256-540-72 -$ $ - $ -
256-540-73 -$ $ - $ -
256-540-74 -$ $ - $ -
256-540-75 -$ $ - $ -
256-540-76 -$ $ - $ -
256-540-77 -$ $ - $ -
256-540-78 -$ $ - $ -
256-540-79 -$ $ - $ -
256-540-80 -$ $ - $ -
256-540-81 -$ $ - $ -
256-540-82 -$ $ - $ -
256-540-83 -$ $ - $ -
256-540-84 -$ $ - $ -
256-540-85 -$ $ - $ -
256-540-86 -$ $ - $ -
TOTAL $ 63,277.20
32 ATTACHMENT E
Item 8.1
Questa Mini Park
ATTACHMENT E Item 8.1
ANNUAL ENGINEER’S REPORT
CITY OF MOUNTAIN HOUSE
CONSOLIDATED LANDSCAPE MAINTENANCE
ASSESSMENT DISTRICT NO. 2016
(Pursuant to the Lighting and Landscape Act of 1972)
PREPARED BY:
MACKAY & SOMPS
CIVIL ENGINEERS
PLEASANTON, CA 94588
May 14, 2025
ATTACHMENT F
Item 8.1
ATTACHMENT F
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2016.doc 3 MacKay & Somps To the Honorable Mayor and members of the City Council
of the City of Mountain House
Mountain House, California
Gentlepersons:
This Annual Engineer’s Report is for the City of Mountain House (previously the Mountain House Community Services District) which was incorporated in 2024. This report is prepared pursuant to and in compliance with the requirements of the “Landscaping and Lighting Act of 1972,” as amended, commencing with the Streets and Highways Code Sections 22500, et. seq. and with the provisions of Proposition 218 adding Article XIII D to the California Constitution.
BACKGROUND
The City of Mountain House used the provisions of the Landscape and Lighting Act of 1972 for establishing the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2016 (District No. 2016). For the 2025-2026 Fiscal Year, District No. 2016 consists of one (1) existing landscape maintenance district area identified by the following zone designation:
ZONE NAME
1 (Cordes Village) Neighborhood D
Reference is made to the previous original annual report and assessment diagram which are on file with the City Clerk of the City of Mountain House. The annual report is for the landscape maintenance district area in District No. 2016. Each landscape maintenance district area is referred to by a zone number and name, currently there is only Zone 1. The improvements and landscaping to be maintained and the method used to spread the assessment for the maintenance costs in Zone 1 shall be the same as set forth in the referenced previous original and/or annual reports and diagrams for District No. 2016.
LOCATION
Zone 1 is located as shown in the referenced reports and diagrams and in the Amended Assessment Diagram included as part of this 2025-2026 Fiscal Year Annual Engineer's Report for District No. 2016.
ATTACHMENT F
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2016.doc 4 MacKay & Somps
IMPROVEMENTS AND LANDSCAPING TO BE MAINTAINED
Zone 1 – Neighborhood D
The landscape improvements are as shown in the approved improvement plans for Parcel G prepared by VanderToolen Associates, as constructed by the developer of Neighborhood D, and as approved and accepted for maintenance and operation by the City of Mountain House.
The landscape improvements are generally described as follows:
1) site grading, earth berms, slopes, trees, shrubs, plantings, and irrigation systems, 2) root deflectors and barriers,
3) decorative paving,
4) walkways and sidewalks, and
5) site lighting
ADMINISTRATION
For Zone 1, the City of Mountain House shall establish, either directly or by subcontract, an ongoing landscape maintenance management entity to be known as the Landscape Maintenance District Manager.
The Landscape Maintenance District Manager shall be responsible for:
• establishing and approving the annual budget;
• keeping an account of the maintenance, operational, and administrative costs; • administering and performing the maintenance of the improvements and landscaping, whether directly or by subcontract; and
• paying all fees, utility costs, taxes and other incidental expenses.
The Landscape Maintenance District Manager for Zone 1 and/or the City of Mountain House shall provide annually the description of improvements to be maintained and of the estimate of maintenance, operation, and administrative costs to be used in the preparation of the Annual Engineer's Report.
ATTACHMENT F
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2016.doc 5 MacKay & Somps
ESTIMATE OF ANNUAL COSTS
The 2025-2026 estimate of costs for the maintenance of improvements and landscaping in Zone 1 is shown in Table 1. The funds required to pay the 2025-2026 estimate of costs will be obtained from the assessments collected for the 2025-2026 tax year. Any surplus in the maintenance fund from the previous fiscal year will be used by District No. 2016 for the cost of operations until receipt of current fiscal year assessment revenues. Similarly, any surplus in the maintenance fund from the current fiscal year will be used by District No. 2016 for the cost of operations until receipt of revenues from the following fiscal year's assessments.
In addition to estimated maintenance and operation costs, the total cost shall include the estimated incidental expenses incurred by the City of Mountain House and the County of San Joaquin for administration, processing, budgeting, preparation of the Annual Engineer's Report, and levying and collecting of assessments.
COST ESTIMATES BY ZONE DESIGNATION
The estimate of costs are only for maintenance of public improvements, landscaping, and park site amenities as identified for Zone 1. All landscape amenity improvements were initially installed by the Developer of the related subdivision at no cost to Zone 1. The estimated annual maintenance costs or other authorized costs are furnished by the Landscape Maintenance District Manager for Zone 1. In addition to estimated maintenance costs, the total costs which are spread each fiscal year for Zone 1 include the estimated incidental expenses incurred by the City of Mountain House and the County of San Joaquin, including the costs for administration, processing, budgeting, preparation of the Annual Engineer's Report, and the levying and collecting of assessments.
ANNUAL BUDGET AND TOTAL ASSESSMENT
The budget for Zone 1 of the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2016 is shown in the following Table 1.
ATTACHMENT F
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2016.doc 6 MacKay & Somps
ATTACHMENT F
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2016.doc 7 MacKay & Somps
FISCAL YEAR ASSESSMENT ROLL
In compliance with the Landscaping and Lighting Act of 1972, as amended, the copies of the County Assessor's Maps and County Assessor's Parcel Numbers are referenced and used in this Annual Engineer's Report for the 2025-2026 Fiscal Year for the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2016 as the Diagram of Assessment Parcels and are incorporated herein by reference as part of the Annual Engineer's Report. Each parcel of land set forth in the Assessment Roll for Zone 1 is identified by the County Assessor's Parcel Number (APN) and an assessment is levied against each parcel of land in the Assessment Roll in accordance with assessment spread criteria described below.
AMENDMENTS TO ASSESSMENT DIAGRAM
Where new landscape maintenance zones are to be added to the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2016 or where there are revisions to an existing zone, new separate sheets, identified by an Amendment Number, will be added to the Annual Engineer's Report to amend the Assessment Diagram and to show the new or revised zone. Each of the separate sheets will be an overall map showing the new or revised zone with reference to parcels as identified by County Assessor's Parcel Number (APN) and including a tabulated index of the Assessor's Maps, as amended, which make up the Assessment Diagram for the indicated new or revised zone. The tabulated index for each new or revised zone will also show whether the current referenced Assessor's Maps are contained in the Assessment Diagram of the original Engineer's Report when the District No. 2016 was formed, or are contained in a subsequent Revision of the Assessment Diagram, or are contained in this Annual Engineer's Report for the 2025-2026 Fiscal Year. All County Assessor's Maps referenced in an index are made a part of the Assessment Diagram by reference.
For the 2025-2026 Fiscal Year, the most recent Assessment Diagram, Amendment No. 1, Neighborhood D is attached to this Annual Engineer's Report.
ATTACHMENT F
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist#2016.doc 8 MacKay & Somps
CRITERIA FOR SPREAD OF ASSESSMENT
In general, the annual assessments for each Zone are spread in accordance with the method and procedure set forth in the Engineer's Report for the formation of each assessment district Zone as previously approved by the City Council of the City of Mountain House. More specifically, the annual costs for maintenance and operation of the landscape improvements in Parcel G, which are a special benefit to the properties in the District, are assessable against the properties in District No. 2016, and may be expressed as 6% of the total general benefit conferred by the entire landscape strip. The remaining 94% of the Total Assessment is assessed against the other properties in District No. 2016 to represent the special benefit provided to meet the requirements of Condition 79.
In compliance with the provisions of Proposition 218, adding Article XIII D to the California Constitution, the benefits conferred on each parcel within the City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2016 are particular and distinct benefits (hereinafter “special benefits”) which are over and above general benefits to such property or to the public at large.
Certain amenities, such as architectural landscaping, curbs, sidewalks, slopes and berms, parks, automatic irrigation systems, privacy and noise reduction architectural walls, and entrance features, were provided specially for the development of the properties within each Zone. These amenities are unique within each Zone and, therefore are determined to be 100% special benefits to the parcels within each Zone and 0% general benefits. The cost to maintain the special benefits within each Zone are assessed solely against the parcels within the Zone. Also, in keeping with the requirements of Proposition 218, no annual individual assessments shall be increased above the amounts assessed under the established criteria for each Zone for the preceding fiscal year without an election approval.
In some Zones, the total of the assessments may be higher than the preceding fiscal year due to the creation of additional subdivision parcels when the pre-established assessment criteria for the Zone are applied to the additional subdivision parcels.
As approved in the original Engineer's Report for the formation of District No. 2016, a cost of living adjustment factor for the 2025-2026 Fiscal Year has been applied for each Zone. The maximum assessment amount for each fiscal year shall be increased in an amount equal to the greater of: 1) three percent (3%); or 2) the percentage increase of the Consumer Price Index (CPI) for San Francisco– Oakland–San Jose County Area for All Urban Consumers, as developed by the U.S. Bureau of Labor Statistics, for a similar period of time, which is 2.40% for the prior 12 months. For this fiscal year a zero percent increase in the cost was considered for District No. 2016 based on the existing surplus and the
ATTACHMENT F
Item 8.1
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
209-450-37 $ - $ - $ -
209-450-38 $ - $ - $ -
209-450-40 $ 51.77 $ 50.16 $ 50.16
209-450-41 $ 51.77 $ 50.16 $ 50.16
262-180-01 $ 51.77 $ 50.16 $ 50.16
262-180-02 $ 51.77 $ 50.16 $ 50.16
262-180-03 $ 51.77 $ 50.16 $ 50.16
262-180-04 $ 51.77 $ 50.16 $ 50.16
262-180-05 $ 51.77 $ 50.16 $ 50.16
262-180-06 $ 51.77 $ 50.16 $ 50.16
262-180-07 $ 51.77 $ 50.16 $ 50.16
262-180-08 $ 51.77 $ 50.16 $ 50.16
262-180-09 $ 51.77 $ 50.16 $ 50.16
262-180-10 $ 51.77 $ 50.16 $ 50.16
262-180-11 $ 51.77 $ 50.16 $ 50.16
262-180-12 $ 51.77 $ 50.16 $ 50.16
262-180-13 $ 51.77 $ 50.16 $ 50.16
262-180-14 $ 51.77 $ 50.16 $ 50.16
262-180-15 $ 51.77 $ 50.16 $ 50.16
262-180-16 $ 51.77 $ 50.16 $ 50.16
262-180-17 $ 51.77 $ 50.16 $ 50.16
262-180-18 $ 51.77 $ 50.16 $ 50.16
262-180-19 $ 51.77 $ 50.16 $ 50.16
262-180-20 $ 51.77 $ 50.16 $ 50.16
262-180-21 $ 51.77 $ 50.16 $ 50.16
262-180-22 $ 51.77 $ 50.16 $ 50.16
262-180-23 $ 51.77 $ 50.16 $ 50.16
262-180-24 $ 51.77 $ 50.16 $ 50.16
262-180-25 $ 51.77 $ 50.16 $ 50.16
262-180-26 $ 51.77 $ 50.16 $ 50.16
262-180-27 $ 51.77 $ 50.16 $ 50.16
262-180-28 $ 51.77 $ 50.16 $ 50.16
262-180-29 $ 51.77 $ 50.16 $ 50.16
262-180-30 $ 51.77 $ 50.16 $ 50.16
262-180-31 $ 51.77 $ 50.16 $ 50.16
262-180-32 $ 51.77 $ 50.16 $ 50.16
262-180-33 $ 51.77 $ 50.16 $ 50.16
262-180-34 $ 51.77 $ 50.16 $ 50.16
262-180-35 $ 51.77 $ 50.16 $ 50.16
262-180-36 $ 51.77 $ 50.16 $ 50.16
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-180-37 $ 51.77 $ 50.16 $ 50.16
262-180-38 $ 51.77 $ 50.16 $ 50.16
262-180-39 $ 51.77 $ 50.16 $ 50.16
262-180-40 $ 51.77 $ 50.16 $ 50.16
262-180-41 $ 51.77 $ 50.16 $ 50.16
262-180-42 $ 51.77 $ 50.16 $ 50.16
262-180-43 $ 51.77 $ 50.16 $ 50.16
262-180-44 $ 51.77 $ 50.16 $ 50.16
262-180-45 $ 51.77 $ 50.16 $ 50.16
262-180-46 $ 51.77 $ 50.16 $ 50.16
262-180-47 $ 51.77 $ 50.16 $ 50.16
262-180-48 $ 51.77 $ 50.16 $ 50.16
262-180-49 $ 51.77 $ 50.16 $ 50.16
262-180-50 $ 51.77 $ 50.16 $ 50.16
262-180-51 $ 51.77 $ 50.16 $ 50.16
262-180-52 $ 51.77 $ 50.16 $ 50.16
262-180-53 $ 51.77 $ 50.16 $ 50.16
262-180-54 $ 51.77 $ 50.16 $ 50.16
262-180-55 $ 51.77 $ 50.16 $ 50.16
262-180-56 $ 51.77 $ 50.16 $ 50.16
262-180-57 $ 51.77 $ 50.16 $ 50.16
262-180-58 $ 51.77 $ 50.16 $ 50.16
262-180-59 $ 51.77 $ 50.16 $ 50.16
262-180-60 $ 51.77 $ 50.16 $ 50.16
262-180-61 $ 51.77 $ 50.16 $ 50.16
262-180-62 $ 51.77 $ 50.16 $ 50.16
262-180-63 $ 51.77 $ 50.16 $ 50.16
262-180-64 $ 51.77 $ 50.16 $ 50.16
262-180-65 $ 51.77 $ 50.16 $ 50.16
262-180-66 $ 51.77 $ 50.16 $ 50.16
262-180-67 $ 51.77 $ 50.16 $ 50.16
262-180-68 $ 51.77 $ 50.16 $ 50.16
262-180-69 $ 51.77 $ 50.16 $ 50.16
262-180-70 $ 51.77 $ 50.16 $ 50.16
262-180-71 $ 51.77 $ 50.16 $ 50.16
262-180-72 $ 51.77 $ 50.16 $ 50.16
262-180-73 $ 51.77 $ 50.16 $ 50.16
262-180-74 $ 51.77 $ 50.16 $ 50.16
262-180-75 $ 51.77 $ 50.16 $ 50.16
262-180-76 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-180-77 $ 51.77 $ 50.16 $ 50.16
262-180-78 $ 51.77 $ 50.16 $ 50.16
262-180-79 $ 51.77 $ 50.16 $ 50.16
262-180-80 $ 51.77 $ 50.16 $ 50.16
262-180-81 $ 51.77 $ 50.16 $ 50.16
262-180-82 $ 51.77 $ 50.16 $ 50.16
262-180-83 $ - $ - $ -
262-180-84 $ - $ - $ -
262-180-85 $ 51.77 $ 50.16 $ 50.16
262-180-87 $ - $ - $ -
262-190-01 $ 51.77 $ 50.16 $ 50.16
262-190-02 $ 51.77 $ 50.16 $ 50.16
262-190-03 $ 51.77 $ 50.16 $ 50.16
262-190-04 $ 51.77 $ 50.16 $ 50.16
262-190-05 $ 51.77 $ 50.16 $ 50.16
262-190-06 $ 51.77 $ 50.16 $ 50.16
262-190-07 $ 51.77 $ 50.16 $ 50.16
262-190-08 $ 51.77 $ 50.16 $ 50.16
262-190-09 $ 51.77 $ 50.16 $ 50.16
262-190-10 $ 51.77 $ 50.16 $ 50.16
262-190-11 $ 51.77 $ 50.16 $ 50.16
262-190-12 $ 51.77 $ 50.16 $ 50.16
262-190-13 $ 51.77 $ 50.16 $ 50.16
262-190-14 $ 51.77 $ 50.16 $ 50.16
262-190-15 $ 51.77 $ 50.16 $ 50.16
262-190-16 $ 51.77 $ 50.16 $ 50.16
262-190-17 $ 51.77 $ 50.16 $ 50.16
262-190-18 $ 51.77 $ 50.16 $ 50.16
262-190-19 $ 51.77 $ 50.16 $ 50.16
262-190-20 $ 51.77 $ 50.16 $ 50.16
262-190-21 $ 51.77 $ 50.16 $ 50.16
262-190-22 $ 51.77 $ 50.16 $ 50.16
262-190-23 $ 51.77 $ 50.16 $ 50.16
262-190-24 $ 51.77 $ 50.16 $ 50.16
262-190-25 $ 51.77 $ 50.16 $ 50.16
262-190-26 $ 51.77 $ 50.16 $ 50.16
262-190-27 $ 51.77 $ 50.16 $ 50.16
262-190-28 $ 51.77 $ 50.16 $ 50.16
262-190-29 $ 51.77 $ 50.16 $ 50.16
262-190-30 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-190-31 $ 51.77 $ 50.16 $ 50.16
262-190-32 $ 51.77 $ 50.16 $ 50.16
262-190-33 $ 51.77 $ 50.16 $ 50.16
262-190-34 $ 51.77 $ 50.16 $ 50.16
262-190-35 $ 51.77 $ 50.16 $ 50.16
262-190-36 $ 51.77 $ 50.16 $ 50.16
262-190-37 $ 51.77 $ 50.16 $ 50.16
262-190-38 $ 51.77 $ 50.16 $ 50.16
262-190-39 $ 51.77 $ 50.16 $ 50.16
262-190-40 $ 51.77 $ 50.16 $ 50.16
262-190-41 $ 51.77 $ 50.16 $ 50.16
262-190-42 $ 51.77 $ 50.16 $ 50.16
262-190-43 $ 51.77 $ 50.16 $ 50.16
262-190-44 $ 51.77 $ 50.16 $ 50.16
262-190-45 $ 51.77 $ 50.16 $ 50.16
262-190-46 $ 51.77 $ 50.16 $ 50.16
262-190-47 $ 51.77 $ 50.16 $ 50.16
262-190-48 $ 51.77 $ 50.16 $ 50.16
262-190-49 $ 51.77 $ 50.16 $ 50.16
262-190-50 $ 51.77 $ 50.16 $ 50.16
262-190-51 $ 51.77 $ 50.16 $ 50.16
262-190-52 $ 51.77 $ 50.16 $ 50.16
262-190-53 $ 51.77 $ 50.16 $ 50.16
262-190-54 $ 51.77 $ 50.16 $ 50.16
262-190-55 $ 51.77 $ 50.16 $ 50.16
262-190-56 $ 51.77 $ 50.16 $ 50.16
262-190-57 $ 51.77 $ 50.16 $ 50.16
262-190-58 $ 51.77 $ 50.16 $ 50.16
262-190-59 $ 51.77 $ 50.16 $ 50.16
262-190-60 $ 51.77 $ 50.16 $ 50.16
262-190-61 $ 51.77 $ 50.16 $ 50.16
262-190-62 $ 51.77 $ 50.16 $ 50.16
262-190-63 $ - $ - $ -
262-190-64 $ - $ - $ -
262-190-65 $ - $ - $ -
262-200-01 $ 51.77 $ 50.16 $ 50.16
262-200-02 $ 51.77 $ 50.16 $ 50.16
262-200-03 $ 51.77 $ 50.16 $ 50.16
262-200-04 $ 51.77 $ 50.16 $ 50.16
262-200-05 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-200-06 $ 51.77 $ 50.16 $ 50.16
262-200-07 $ 51.77 $ 50.16 $ 50.16
262-200-08 $ 51.77 $ 50.16 $ 50.16
262-200-09 $ 51.77 $ 50.16 $ 50.16
262-200-10 $ 51.77 $ 50.16 $ 50.16
262-200-11 $ 51.77 $ 50.16 $ 50.16
262-200-12 $ 51.77 $ 50.16 $ 50.16
262-200-13 $ 51.77 $ 50.16 $ 50.16
262-200-14 $ 51.77 $ 50.16 $ 50.16
262-200-15 $ 51.77 $ 50.16 $ 50.16
262-200-16 $ 51.77 $ 50.16 $ 50.16
262-200-17 $ 51.77 $ 50.16 $ 50.16
262-200-18 $ 51.77 $ 50.16 $ 50.16
262-200-19 $ 51.77 $ 50.16 $ 50.16
262-200-20 $ 51.77 $ 50.16 $ 50.16
262-200-21 $ 51.77 $ 50.16 $ 50.16
262-200-22 $ 51.77 $ 50.16 $ 50.16
262-200-23 $ 51.77 $ 50.16 $ 50.16
262-200-24 $ 51.77 $ 50.16 $ 50.16
262-200-25 $ 51.77 $ 50.16 $ 50.16
262-200-26 $ 51.77 $ 50.16 $ 50.16
262-200-27 $ 51.77 $ 50.16 $ 50.16
262-200-28 $ 51.77 $ 50.16 $ 50.16
262-200-29 $ 51.77 $ 50.16 $ 50.16
262-200-30 $ 51.77 $ 50.16 $ 50.16
262-200-31 $ 51.77 $ 50.16 $ 50.16
262-200-32 $ 51.77 $ 50.16 $ 50.16
262-200-33 $ 51.77 $ 50.16 $ 50.16
262-200-34 $ 51.77 $ 50.16 $ 50.16
262-200-35 $ 51.77 $ 50.16 $ 50.16
262-200-36 $ 51.77 $ 50.16 $ 50.16
262-200-37 $ 51.77 $ 50.16 $ 50.16
262-200-38 $ 51.77 $ 50.16 $ 50.16
262-200-39 $ 51.77 $ 50.16 $ 50.16
262-200-40 $ 51.77 $ 50.16 $ 50.16
262-200-41 $ 51.77 $ 50.16 $ 50.16
262-200-42 $ 51.77 $ 50.16 $ 50.16
262-200-43 $ 51.77 $ 50.16 $ 50.16
262-200-44 $ 51.77 $ 50.16 $ 50.16
262-200-45 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-200-46 $ 51.77 $ 50.16 $ 50.16
262-200-47 $ 51.77 $ 50.16 $ 50.16
262-200-48 $ 51.77 $ 50.16 $ 50.16
262-200-49 $ 51.77 $ 50.16 $ 50.16
262-200-50 $ 51.77 $ 50.16 $ 50.16
262-200-51 $ 51.77 $ 50.16 $ 50.16
262-200-52 $ 51.77 $ 50.16 $ 50.16
262-200-53 $ 51.77 $ 50.16 $ 50.16
262-200-54 $ 51.77 $ 50.16 $ 50.16
262-200-55 $ 51.77 $ 50.16 $ 50.16
262-200-56 $ 51.77 $ 50.16 $ 50.16
262-200-57 $ 51.77 $ 50.16 $ 50.16
262-200-58 $ 51.77 $ 50.16 $ 50.16
262-200-59 $ 51.77 $ 50.16 $ 50.16
262-200-60 $ 51.77 $ 50.16 $ 50.16
262-200-61 $ 51.77 $ 50.16 $ 50.16
262-200-62 $ 51.77 $ 50.16 $ 50.16
262-200-63 $ 51.77 $ 50.16 $ 50.16
262-200-64 $ 51.77 $ 50.16 $ 50.16
262-200-65 $ 51.77 $ 50.16 $ 50.16
262-200-66 $ 51.77 $ 50.16 $ 50.16
262-200-67 $ 51.77 $ 50.16 $ 50.16
262-200-68 $ 51.77 $ 50.16 $ 50.16
262-200-69 $ 51.77 $ 50.16 $ 50.16
262-200-70 $ 51.77 $ 50.16 $ 50.16
262-200-71 $ 51.77 $ 50.16 $ 50.16
262-200-72 $ 51.77 $ 50.16 $ 50.16
262-200-73 $ 51.77 $ 50.16 $ 50.16
262-200-74 $ 51.77 $ 50.16 $ 50.16
262-200-75 $ 51.77 $ 50.16 $ 50.16
262-200-76 $ 51.77 $ 50.16 $ 50.16
262-200-77 $ 51.77 $ 50.16 $ 50.16
262-200-78 $ 51.77 $ 50.16 $ 50.16
262-200-79 $ 51.77 $ 50.16 $ 50.16
262-200-80 $ 51.77 $ 50.16 $ 50.16
262-200-81 $ 51.77 $ 50.16 $ 50.16
262-200-82 $ 51.77 $ 50.16 $ 50.16
262-200-83 $ 51.77 $ 50.16 $ 50.16
262-200-84 $ 51.77 $ 50.16 $ 50.16
262-200-85 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-200-86 $ 51.77 $ 50.16 $ 50.16
262-200-87 $ - $ - $ -
262-210-01 $ 51.77 $ 50.16 $ 50.16
262-210-02 $ 51.77 $ 50.16 $ 50.16
262-210-03 $ 51.77 $ 50.16 $ 50.16
262-210-04 $ 51.77 $ 50.16 $ 50.16
262-210-05 $ 51.77 $ 50.16 $ 50.16
262-210-06 $ 51.77 $ 50.16 $ 50.16
262-210-07 $ 51.77 $ 50.16 $ 50.16
262-210-08 $ 51.77 $ 50.16 $ 50.16
262-210-09 $ 51.77 $ 50.16 $ 50.16
262-210-10 $ 51.77 $ 50.16 $ 50.16
262-210-11 $ 51.77 $ 50.16 $ 50.16
262-210-12 $ 51.77 $ 50.16 $ 50.16
262-210-13 $ 51.77 $ 50.16 $ 50.16
262-210-14 $ 51.77 $ 50.16 $ 50.16
262-210-15 $ 51.77 $ 50.16 $ 50.16
262-210-16 $ 51.77 $ 50.16 $ 50.16
262-210-17 $ 51.77 $ 50.16 $ 50.16
262-210-18 $ 51.77 $ 50.16 $ 50.16
262-210-19 $ 51.77 $ 50.16 $ 50.16
262-210-20 $ 51.77 $ 50.16 $ 50.16
262-210-21 $ 51.77 $ 50.16 $ 50.16
262-210-22 $ 51.77 $ 50.16 $ 50.16
262-210-23 $ 51.77 $ 50.16 $ 50.16
262-210-24 $ 51.77 $ 50.16 $ 50.16
262-210-25 $ 51.77 $ 50.16 $ 50.16
262-210-26 $ 51.77 $ 50.16 $ 50.16
262-210-27 $ 51.77 $ 50.16 $ 50.16
262-210-28 $ 51.77 $ 50.16 $ 50.16
262-210-29 $ 51.77 $ 50.16 $ 50.16
262-210-30 $ 51.77 $ 50.16 $ 50.16
262-210-31 $ 51.77 $ 50.16 $ 50.16
262-210-32 $ 51.77 $ 50.16 $ 50.16
262-210-33 $ 51.77 $ 50.16 $ 50.16
262-210-34 $ 51.77 $ 50.16 $ 50.16
262-210-35 $ 51.77 $ 50.16 $ 50.16
262-210-36 $ 51.77 $ 50.16 $ 50.16
262-210-37 $ 51.77 $ 50.16 $ 50.16
262-210-38 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-210-39 $ 51.77 $ 50.16 $ 50.16
262-210-40 $ 51.77 $ 50.16 $ 50.16
262-210-41 $ 51.77 $ 50.16 $ 50.16
262-210-42 $ 51.77 $ 50.16 $ 50.16
262-210-43 $ 51.77 $ 50.16 $ 50.16
262-210-44 $ 51.77 $ 50.16 $ 50.16
262-210-45 $ 51.77 $ 50.16 $ 50.16
262-210-46 $ 51.77 $ 50.16 $ 50.16
262-210-47 $ 51.77 $ 50.16 $ 50.16
262-210-48 $ 51.77 $ 50.16 $ 50.16
262-210-49 $ 51.77 $ 50.16 $ 50.16
262-210-50 $ 51.77 $ 50.16 $ 50.16
262-210-51 $ 51.77 $ 50.16 $ 50.16
262-210-52 $ 51.77 $ 50.16 $ 50.16
262-210-53 $ - $ - $ -
262-210-54 $ - $ - $ -
262-220-01 $ 51.77 $ 50.16 $ 50.16
262-220-02 $ 51.77 $ 50.16 $ 50.16
262-220-03 $ 51.77 $ 50.16 $ 50.16
262-220-04 $ 51.77 $ 50.16 $ 50.16
262-220-05 $ 51.77 $ 50.16 $ 50.16
262-220-06 $ 51.77 $ 50.16 $ 50.16
262-220-07 $ 51.77 $ 50.16 $ 50.16
262-220-08 $ 51.77 $ 50.16 $ 50.16
262-220-09 $ 51.77 $ 50.16 $ 50.16
262-220-10 $ 51.77 $ 50.16 $ 50.16
262-220-11 $ 51.77 $ 50.16 $ 50.16
262-220-12 $ 51.77 $ 50.16 $ 50.16
262-220-13 $ 51.77 $ 50.16 $ 50.16
262-220-14 $ 51.77 $ 50.16 $ 50.16
262-220-15 $ 51.77 $ 50.16 $ 50.16
262-220-16 $ 51.77 $ 50.16 $ 50.16
262-220-17 $ 51.77 $ 50.16 $ 50.16
262-220-18 $ 51.77 $ 50.16 $ 50.16
262-220-19 $ 51.77 $ 50.16 $ 50.16
262-220-20 $ 51.77 $ 50.16 $ 50.16
262-220-21 $ 51.77 $ 50.16 $ 50.16
262-220-22 $ 51.77 $ 50.16 $ 50.16
262-220-23 $ 51.77 $ 50.16 $ 50.16
262-220-24 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-220-25 $ 51.77 $ 50.16 $ 50.16
262-220-26 $ 51.77 $ 50.16 $ 50.16
262-220-27 $ 51.77 $ 50.16 $ 50.16
262-220-28 $ 51.77 $ 50.16 $ 50.16
262-220-29 $ 51.77 $ 50.16 $ 50.16
262-220-30 $ 51.77 $ 50.16 $ 50.16
262-220-31 $ 51.77 $ 50.16 $ 50.16
262-220-32 $ 51.77 $ 50.16 $ 50.16
262-220-33 $ 51.77 $ 50.16 $ 50.16
262-220-34 $ 51.77 $ 50.16 $ 50.16
262-220-35 $ 51.77 $ 50.16 $ 50.16
262-220-36 $ 51.77 $ 50.16 $ 50.16
262-220-37 $ 51.77 $ 50.16 $ 50.16
262-220-38 $ 51.77 $ 50.16 $ 50.16
262-220-39 $ 51.77 $ 50.16 $ 50.16
262-220-40 $ 51.77 $ 50.16 $ 50.16
262-220-41 $ 51.77 $ 50.16 $ 50.16
262-220-42 $ 51.77 $ 50.16 $ 50.16
262-220-43 $ 51.77 $ 50.16 $ 50.16
262-220-44 $ 51.77 $ 50.16 $ 50.16
262-220-45 $ 51.77 $ 50.16 $ 50.16
262-220-46 $ 51.77 $ 50.16 $ 50.16
262-220-47 $ 51.77 $ 50.16 $ 50.16
262-220-48 $ 51.77 $ 50.16 $ 50.16
262-220-49 $ 51.77 $ 50.16 $ 50.16
262-220-50 $ 51.77 $ 50.16 $ 50.16
262-220-51 $ 51.77 $ 50.16 $ 50.16
262-220-52 $ 51.77 $ 50.16 $ 50.16
262-220-53 $ 51.77 $ 50.16 $ 50.16
262-220-54 $ 51.77 $ 50.16 $ 50.16
262-220-55 $ 51.77 $ 50.16 $ 50.16
262-220-56 $ 51.77 $ 50.16 $ 50.16
262-220-57 $ 51.77 $ 50.16 $ 50.16
262-220-58 $ 51.77 $ 50.16 $ 50.16
262-220-59 $ 51.77 $ 50.16 $ 50.16
262-220-60 $ 51.77 $ 50.16 $ 50.16
262-220-61 $ 51.77 $ 50.16 $ 50.16
262-220-62 $ 51.77 $ 50.16 $ 50.16
262-220-63 $ - $ - $ -
262-230-01 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-230-02 $ 51.77 $ 50.16 $ 50.16
262-230-03 $ 51.77 $ 50.16 $ 50.16
262-230-04 $ 51.77 $ 50.16 $ 50.16
262-230-05 $ 51.77 $ 50.16 $ 50.16
262-230-06 $ 51.77 $ 50.16 $ 50.16
262-230-07 $ 51.77 $ 50.16 $ 50.16
262-230-08 $ 51.77 $ 50.16 $ 50.16
262-230-09 $ 51.77 $ 50.16 $ 50.16
262-230-10 $ 51.77 $ 50.16 $ 50.16
262-230-11 $ 51.77 $ 50.16 $ 50.16
262-230-12 $ 51.77 $ 50.16 $ 50.16
262-230-13 $ 51.77 $ 50.16 $ 50.16
262-230-14 $ 51.77 $ 50.16 $ 50.16
262-230-15 $ 51.77 $ 50.16 $ 50.16
262-230-16 $ 51.77 $ 50.16 $ 50.16
262-230-17 $ 51.77 $ 50.16 $ 50.16
262-230-18 $ 51.77 $ 50.16 $ 50.16
262-230-19 $ 51.77 $ 50.16 $ 50.16
262-230-20 $ 51.77 $ 50.16 $ 50.16
262-230-21 $ 51.77 $ 50.16 $ 50.16
262-230-22 $ 51.77 $ 50.16 $ 50.16
262-230-23 $ 51.77 $ 50.16 $ 50.16
262-230-24 $ 51.77 $ 50.16 $ 50.16
262-230-25 $ 51.77 $ 50.16 $ 50.16
262-230-26 $ 51.77 $ 50.16 $ 50.16
262-230-27 $ 51.77 $ 50.16 $ 50.16
262-230-28 $ 51.77 $ 50.16 $ 50.16
262-230-29 $ 51.77 $ 50.16 $ 50.16
262-230-30 $ 51.77 $ 50.16 $ 50.16
262-230-31 $ 51.77 $ 50.16 $ 50.16
262-230-32 $ 51.77 $ 50.16 $ 50.16
262-230-33 $ 51.77 $ 50.16 $ 50.16
262-230-34 $ 51.77 $ 50.16 $ 50.16
262-230-35 $ 51.77 $ 50.16 $ 50.16
262-230-36 $ 51.77 $ 50.16 $ 50.16
262-230-37 $ 51.77 $ 50.16 $ 50.16
262-230-38 $ 51.77 $ 50.16 $ 50.16
262-230-39 $ 51.77 $ 50.16 $ 50.16
262-230-40 $ 51.77 $ 50.16 $ 50.16
262-230-41 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-230-42 $ 51.77 $ 50.16 $ 50.16
262-230-43 $ 51.77 $ 50.16 $ 50.16
262-230-44 $ 51.77 $ 50.16 $ 50.16
262-230-45 $ 51.77 $ 50.16 $ 50.16
262-230-46 $ 51.77 $ 50.16 $ 50.16
262-230-47 $ 51.77 $ 50.16 $ 50.16
262-230-48 $ 51.77 $ 50.16 $ 50.16
262-230-49 $ 51.77 $ 50.16 $ 50.16
262-230-50 $ 51.77 $ 50.16 $ 50.16
262-230-51 $ 51.77 $ 50.16 $ 50.16
262-230-52 $ 51.77 $ 50.16 $ 50.16
262-230-53 $ 51.77 $ 50.16 $ 50.16
262-230-54 $ 51.77 $ 50.16 $ 50.16
262-230-55 $ 51.77 $ 50.16 $ 50.16
262-230-56 $ 51.77 $ 50.16 $ 50.16
262-230-57 $ 51.77 $ 50.16 $ 50.16
262-230-58 $ 51.77 $ 50.16 $ 50.16
262-230-59 $ 51.77 $ 50.16 $ 50.16
262-230-60 $ 51.77 $ 50.16 $ 50.16
262-230-61 $ 51.77 $ 50.16 $ 50.16
262-230-62 $ 51.77 $ 50.16 $ 50.16
262-230-63 $ 51.77 $ 50.16 $ 50.16
262-230-64 $ 51.77 $ 50.16 $ 50.16
262-230-65 $ 51.77 $ 50.16 $ 50.16
262-230-66 $ 51.77 $ 50.16 $ 50.16
262-230-67 $ 51.77 $ 50.16 $ 50.16
262-230-68 $ 51.77 $ 50.16 $ 50.16
262-230-69 $ 51.77 $ 50.16 $ 50.16
262-230-70 $ 51.77 $ 50.16 $ 50.16
262-230-71 $ 51.77 $ 50.16 $ 50.16
262-230-72 $ 51.77 $ 50.16 $ 50.16
262-230-73 $ 51.77 $ 50.16 $ 50.16
262-230-74 $ 51.77 $ 50.16 $ 50.16
262-230-75 $ 51.77 $ 50.16 $ 50.16
262-230-76 $ 51.77 $ 50.16 $ 50.16
262-230-77 $ 51.77 $ 50.16 $ 50.16
262-230-78 $ 51.77 $ 50.16 $ 50.16
262-230-79 $ 51.77 $ 50.16 $ 50.16
262-230-80 $ 51.77 $ 50.16 $ 50.16
262-230-81 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-230-82 $ 51.77 $ 50.16 $ 50.16
262-230-83 $ - $ - $ -
262-230-84 $ - $ - $ -
262-240-01 $ 51.77 $ 50.16 $ 50.16
262-240-02 $ 51.77 $ 50.16 $ 50.16
262-240-03 $ 51.77 $ 50.16 $ 50.16
262-240-04 $ 51.77 $ 50.16 $ 50.16
262-240-05 $ 51.77 $ 50.16 $ 50.16
262-240-06 $ 51.77 $ 50.16 $ 50.16
262-240-07 $ 51.77 $ 50.16 $ 50.16
262-240-08 $ 51.77 $ 50.16 $ 50.16
262-240-09 $ 51.77 $ 50.16 $ 50.16
262-240-10 $ 51.77 $ 50.16 $ 50.16
262-240-11 $ 51.77 $ 50.16 $ 50.16
262-240-12 $ 51.77 $ 50.16 $ 50.16
262-240-13 $ 51.77 $ 50.16 $ 50.16
262-240-14 $ 51.77 $ 50.16 $ 50.16
262-240-15 $ 51.77 $ 50.16 $ 50.16
262-240-16 $ 51.77 $ 50.16 $ 50.16
262-240-17 $ 51.77 $ 50.16 $ 50.16
262-240-18 $ 51.77 $ 50.16 $ 50.16
262-240-19 $ 51.77 $ 50.16 $ 50.16
262-240-20 $ 51.77 $ 50.16 $ 50.16
262-240-21 $ 51.77 $ 50.16 $ 50.16
262-240-22 $ 51.77 $ 50.16 $ 50.16
262-240-23 $ 51.77 $ 50.16 $ 50.16
262-240-24 $ 51.77 $ 50.16 $ 50.16
262-240-25 $ 51.77 $ 50.16 $ 50.16
262-240-26 $ 51.77 $ 50.16 $ 50.16
262-240-27 $ 51.77 $ 50.16 $ 50.16
262-240-28 $ 51.77 $ 50.16 $ 50.16
262-240-29 $ 51.77 $ 50.16 $ 50.16
262-240-30 $ 51.77 $ 50.16 $ 50.16
262-240-31 $ 51.77 $ 50.16 $ 50.16
262-240-32 $ 51.77 $ 50.16 $ 50.16
262-240-33 $ 51.77 $ 50.16 $ 50.16
262-240-34 $ 51.77 $ 50.16 $ 50.16
262-240-35 $ 51.77 $ 50.16 $ 50.16
262-240-36 $ 51.77 $ 50.16 $ 50.16
262-240-37 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-240-38 $ 51.77 $ 50.16 $ 50.16
262-240-39 $ 51.77 $ 50.16 $ 50.16
262-240-40 $ 51.77 $ 50.16 $ 50.16
262-240-41 $ 51.77 $ 50.16 $ 50.16
262-240-42 $ 51.77 $ 50.16 $ 50.16
262-240-43 $ 51.77 $ 50.16 $ 50.16
262-240-44 $ 51.77 $ 50.16 $ 50.16
262-240-45 $ 51.77 $ 50.16 $ 50.16
262-240-46 $ 51.77 $ 50.16 $ 50.16
262-240-47 $ 51.77 $ 50.16 $ 50.16
262-240-48 $ 51.77 $ 50.16 $ 50.16
262-240-49 $ 51.77 $ 50.16 $ 50.16
262-240-50 $ 51.77 $ 50.16 $ 50.16
262-240-51 $ 51.77 $ 50.16 $ 50.16
262-240-52 $ 51.77 $ 50.16 $ 50.16
262-240-53 $ 51.77 $ 50.16 $ 50.16
262-240-54 $ 51.77 $ 50.16 $ 50.16
262-240-55 $ - $ - $ -
262-240-56 $ - $ - $ -
262-240-57 $ - $ - $ -
262-250-01 $ 51.77 $ 50.16 $ 50.16
262-250-02 $ 51.77 $ 50.16 $ 50.16
262-250-03 $ 51.77 $ 50.16 $ 50.16
262-250-04 $ 51.77 $ 50.16 $ 50.16
262-250-05 $ 51.77 $ 50.16 $ 50.16
262-250-06 $ 51.77 $ 50.16 $ 50.16
262-250-07 $ 51.77 $ 50.16 $ 50.16
262-250-08 $ 51.77 $ 50.16 $ 50.16
262-250-09 $ 51.77 $ 50.16 $ 50.16
262-250-10 $ 51.77 $ 50.16 $ 50.16
262-250-11 $ 51.77 $ 50.16 $ 50.16
262-250-12 $ 51.77 $ 50.16 $ 50.16
262-250-13 $ 51.77 $ 50.16 $ 50.16
262-250-14 $ 51.77 $ 50.16 $ 50.16
262-250-15 $ 51.77 $ 50.16 $ 50.16
262-250-16 $ 51.77 $ 50.16 $ 50.16
262-250-17 $ 51.77 $ 50.16 $ 50.16
262-250-18 $ 51.77 $ 50.16 $ 50.16
262-250-19 $ 51.77 $ 50.16 $ 50.16
262-250-20 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-250-21 $ 51.77 $ 50.16 $ 50.16
262-250-22 $ 51.77 $ 50.16 $ 50.16
262-250-23 $ 51.77 $ 50.16 $ 50.16
262-250-24 $ 51.77 $ 50.16 $ 50.16
262-250-25 $ 51.77 $ 50.16 $ 50.16
262-250-26 $ 51.77 $ 50.16 $ 50.16
262-250-27 $ 51.77 $ 50.16 $ 50.16
262-250-28 $ 51.77 $ 50.16 $ 50.16
262-250-29 $ 51.77 $ 50.16 $ 50.16
262-250-30 $ 51.77 $ 50.16 $ 50.16
262-250-31 $ 51.77 $ 50.16 $ 50.16
262-250-32 $ 51.77 $ 50.16 $ 50.16
262-250-33 $ 51.77 $ 50.16 $ 50.16
262-250-34 $ 51.77 $ 50.16 $ 50.16
262-250-35 $ 51.77 $ 50.16 $ 50.16
262-250-36 $ 51.77 $ 50.16 $ 50.16
262-250-37 $ 51.77 $ 50.16 $ 50.16
262-250-38 $ 51.77 $ 50.16 $ 50.16
262-250-39 $ 51.77 $ 50.16 $ 50.16
262-250-40 $ 51.77 $ 50.16 $ 50.16
262-250-41 $ 51.77 $ 50.16 $ 50.16
262-250-42 $ 51.77 $ 50.16 $ 50.16
262-250-43 $ 51.77 $ 50.16 $ 50.16
262-250-44 $ 51.77 $ 50.16 $ 50.16
262-250-45 $ 51.77 $ 50.16 $ 50.16
262-250-46 $ 51.77 $ 50.16 $ 50.16
262-250-47 $ 51.77 $ 50.16 $ 50.16
262-250-48 $ 51.77 $ 50.16 $ 50.16
262-250-49 $ 51.77 $ 50.16 $ 50.16
262-250-50 $ 51.77 $ 50.16 $ 50.16
262-250-51 $ 51.77 $ 50.16 $ 50.16
262-250-52 $ 51.77 $ 50.16 $ 50.16
262-250-53 $ 51.77 $ 50.16 $ 50.16
262-250-54 $ 51.77 $ 50.16 $ 50.16
262-250-55 $ 51.77 $ 50.16 $ 50.16
262-250-56 $ 51.77 $ 50.16 $ 50.16
262-250-57 $ - $ - $ -
262-260-01 $ 51.77 $ 50.16 $ 50.16
262-260-02 $ 51.77 $ 50.16 $ 50.16
262-260-03 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-260-04 $ 51.77 $ 50.16 $ 50.16
262-260-05 $ 51.77 $ 50.16 $ 50.16
262-260-09 $ 51.77 $ 50.16 $ 50.16
262-260-10 $ 51.77 $ 50.16 $ 50.16
262-260-11 $ 51.77 $ 50.16 $ 50.16
262-260-12 $ 51.77 $ 50.16 $ 50.16
262-260-13 $ 51.77 $ 50.16 $ 50.16
262-260-14 $ 51.77 $ 50.16 $ 50.16
262-260-15 $ 51.77 $ 50.16 $ 50.16
262-260-16 $ 51.77 $ 50.16 $ 50.16
262-260-17 $ 51.77 $ 50.16 $ 50.16
262-260-18 $ 51.77 $ 50.16 $ 50.16
262-260-19 $ 51.77 $ 50.16 $ 50.16
262-260-20 $ 51.77 $ 50.16 $ 50.16
262-260-21 $ 51.77 $ 50.16 $ 50.16
262-260-22 $ 51.77 $ 50.16 $ 50.16
262-260-23 $ 51.77 $ 50.16 $ 50.16
262-260-24 $ 51.77 $ 50.16 $ 50.16
262-260-25 $ 51.77 $ 50.16 $ 50.16
262-260-26 $ 51.77 $ 50.16 $ 50.16
262-260-27 $ 51.77 $ 50.16 $ 50.16
262-260-28 $ 51.77 $ 50.16 $ 50.16
262-260-29 $ 51.77 $ 50.16 $ 50.16
262-260-30 $ 51.77 $ 50.16 $ 50.16
262-260-31 $ 51.77 $ 50.16 $ 50.16
262-260-32 $ 51.77 $ 50.16 $ 50.16
262-260-33 $ 51.77 $ 50.16 $ 50.16
262-260-34 $ 51.77 $ 50.16 $ 50.16
262-260-35 $ 51.77 $ 50.16 $ 50.16
262-260-36 $ 51.77 $ 50.16 $ 50.16
262-260-37 $ 51.77 $ 50.16 $ 50.16
262-260-38 $ 51.77 $ 50.16 $ 50.16
262-260-39 $ 51.77 $ 50.16 $ 50.16
262-260-40 $ 51.77 $ 50.16 $ 50.16
262-260-41 $ 51.77 $ 50.16 $ 50.16
262-260-42 $ 51.77 $ 50.16 $ 50.16
262-260-43 $ 51.77 $ 50.16 $ 50.16
262-260-44 $ 51.77 $ 50.16 $ 50.16
262-260-45 $ 51.77 $ 50.16 $ 50.16
262-260-46 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-260-47 $ - $ - $ -
262-260-48 $ 51.77 $ 50.16 $ 50.16
262-260-49 $ 51.77 $ 50.16 $ 50.16
262-260-50 $ 51.77 $ 50.16 $ 50.16
262-270-01 $ 51.77 $ 50.16 $ 50.16
262-270-02 $ 51.77 $ 50.16 $ 50.16
262-270-03 $ 51.77 $ 50.16 $ 50.16
262-270-04 $ 51.77 $ 50.16 $ 50.16
262-270-05 $ 51.77 $ 50.16 $ 50.16
262-270-06 $ 51.77 $ 50.16 $ 50.16
262-270-07 $ 51.77 $ 50.16 $ 50.16
262-270-08 $ 51.77 $ 50.16 $ 50.16
262-270-09 $ 51.77 $ 50.16 $ 50.16
262-270-10 $ 51.77 $ 50.16 $ 50.16
262-270-11 $ 51.77 $ 50.16 $ 50.16
262-270-12 $ 51.77 $ 50.16 $ 50.16
262-270-13 $ 51.77 $ 50.16 $ 50.16
262-270-14 $ 51.77 $ 50.16 $ 50.16
262-270-15 $ 51.77 $ 50.16 $ 50.16
262-270-16 $ 51.77 $ 50.16 $ 50.16
262-270-17 $ 51.77 $ 50.16 $ 50.16
262-270-18 $ 51.77 $ 50.16 $ 50.16
262-270-19 $ 51.77 $ 50.16 $ 50.16
262-270-20 $ 51.77 $ 50.16 $ 50.16
262-270-21 $ 51.77 $ 50.16 $ 50.16
262-270-22 $ 51.77 $ 50.16 $ 50.16
262-270-23 $ 51.77 $ 50.16 $ 50.16
262-270-24 $ 51.77 $ 50.16 $ 50.16
262-270-25 $ 51.77 $ 50.16 $ 50.16
262-270-26 $ 51.77 $ 50.16 $ 50.16
262-270-27 $ 51.77 $ 50.16 $ 50.16
262-270-28 $ 51.77 $ 50.16 $ 50.16
262-270-29 $ 51.77 $ 50.16 $ 50.16
262-270-30 $ 51.77 $ 50.16 $ 50.16
262-270-31 $ 51.77 $ 50.16 $ 50.16
262-270-32 $ 51.77 $ 50.16 $ 50.16
262-270-33 $ 51.77 $ 50.16 $ 50.16
262-270-34 $ 51.77 $ 50.16 $ 50.16
262-270-35 $ 51.77 $ 50.16 $ 50.16
262-270-36 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-270-37 $ 51.77 $ 50.16 $ 50.16
262-270-38 $ 51.77 $ 50.16 $ 50.16
262-270-39 $ 51.77 $ 50.16 $ 50.16
262-270-40 $ 51.77 $ 50.16 $ 50.16
262-270-41 $ 51.77 $ 50.16 $ 50.16
262-270-42 $ 51.77 $ 50.16 $ 50.16
262-270-43 $ 51.77 $ 50.16 $ 50.16
262-270-44 $ 51.77 $ 50.16 $ 50.16
262-270-45 $ 51.77 $ 50.16 $ 50.16
262-270-46 $ 51.77 $ 50.16 $ 50.16
262-270-47 $ 51.77 $ 50.16 $ 50.16
262-270-48 $ 51.77 $ 50.16 $ 50.16
262-550-01 $ 51.77 $ 50.16 $ 50.16
262-550-02 $ 51.77 $ 50.16 $ 50.16
262-550-03 $ 51.77 $ 50.16 $ 50.16
262-550-04 $ 51.77 $ 50.16 $ 50.16
262-550-05 $ 51.77 $ 50.16 $ 50.16
262-550-06 $ 51.77 $ 50.16 $ 50.16
262-550-07 $ 51.77 $ 50.16 $ 50.16
262-550-08 $ 51.77 $ 50.16 $ 50.16
262-550-09 $ 51.77 $ 50.16 $ 50.16
262-550-10 $ 51.77 $ 50.16 $ 50.16
262-550-11 $ 51.77 $ 50.16 $ 50.16
262-550-12 $ 51.77 $ 50.16 $ 50.16
262-550-13 $ 51.77 $ 50.16 $ 50.16
262-550-14 $ 51.77 $ 50.16 $ 50.16
262-550-15 $ 51.77 $ 50.16 $ 50.16
262-550-16 $ 51.77 $ 50.16 $ 50.16
262-550-17 $ 51.77 $ 50.16 $ 50.16
262-550-18 $ 51.77 $ 50.16 $ 50.16
262-550-19 $ 51.77 $ 50.16 $ 50.16
262-550-20 $ 51.77 $ 50.16 $ 50.16
262-550-21 $ 51.77 $ 50.16 $ 50.16
262-550-22 $ 51.77 $ 50.16 $ 50.16
262-550-23 $ 51.77 $ 50.16 $ 50.16
262-550-24 $ 51.77 $ 50.16 $ 50.16
262-550-25 $ 51.77 $ 50.16 $ 50.16
262-550-26 $ 51.77 $ 50.16 $ 50.16
262-550-27 $ 51.77 $ 50.16 $ 50.16
262-550-28 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-550-29 $ 51.77 $ 50.16 $ 50.16
262-550-30 $ 51.77 $ 50.16 $ 50.16
262-550-31 $ 51.77 $ 50.16 $ 50.16
262-550-32 $ 51.77 $ 50.16 $ 50.16
262-550-33 $ 51.77 $ 50.16 $ 50.16
262-550-34 $ 51.77 $ 50.16 $ 50.16
262-550-35 $ 51.77 $ 50.16 $ 50.16
262-550-36 $ 51.77 $ 50.16 $ 50.16
262-550-37 $ 51.77 $ 50.16 $ 50.16
262-550-38 $ 51.77 $ 50.16 $ 50.16
262-550-39 $ 51.77 $ 50.16 $ 50.16
262-550-40 $ 51.77 $ 50.16 $ 50.16
262-550-41 $ 51.77 $ 50.16 $ 50.16
262-550-42 $ 51.77 $ 50.16 $ 50.16
262-550-43 $ 51.77 $ 50.16 $ 50.16
262-550-44 $ 51.77 $ 50.16 $ 50.16
262-550-45 $ 51.77 $ 50.16 $ 50.16
262-550-46 $ 51.77 $ 50.16 $ 50.16
262-550-47 $ - $ - $ -
262-550-48 $ - $ - $ -
262-550-49 $ - $ - $ -
262-550-50 $ - $ - $ -
262-550-51 $ - $ - $ -
262-550-52 $ - $ - $ -
262-550-53 $ - $ - $ -
262-550-54 $ - $ - $ -
262-550-55 $ - $ - $ -
262-550-56 $ - $ - $ -
262-550-57 $ - $ - $ -
262-550-58 $ - $ - $ -
262-560-01 $ 51.77 $ 50.16 $ 50.16
262-560-02 $ 51.77 $ 50.16 $ 50.16
262-560-03 $ 51.77 $ 50.16 $ 50.16
262-560-04 $ 51.77 $ 50.16 $ 50.16
262-560-05 $ 51.77 $ 50.16 $ 50.16
262-560-06 $ 51.77 $ 50.16 $ 50.16
262-560-07 $ 51.77 $ 50.16 $ 50.16
262-560-08 $ 51.77 $ 50.16 $ 50.16
262-560-09 $ 51.77 $ 50.16 $ 50.16
262-560-10 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-560-11 $ 51.77 $ 50.16 $ 50.16
262-560-12 $ 51.77 $ 50.16 $ 50.16
262-560-13 $ 51.77 $ 50.16 $ 50.16
262-560-14 $ 51.77 $ 50.16 $ 50.16
262-560-15 $ 51.77 $ 50.16 $ 50.16
262-560-16 $ 51.77 $ 50.16 $ 50.16
262-560-17 $ 51.77 $ 50.16 $ 50.16
262-560-18 $ 51.77 $ 50.16 $ 50.16
262-560-19 $ 51.77 $ 50.16 $ 50.16
262-560-20 $ 51.77 $ 50.16 $ 50.16
262-560-21 $ 51.77 $ 50.16 $ 50.16
262-560-22 $ 51.77 $ 50.16 $ 50.16
262-560-23 $ 51.77 $ 50.16 $ 50.16
262-560-24 $ 51.77 $ 50.16 $ 50.16
262-560-25 $ 51.77 $ 50.16 $ 50.16
262-560-26 $ 51.77 $ 50.16 $ 50.16
262-560-27 $ 51.77 $ 50.16 $ 50.16
262-560-28 $ 51.77 $ 50.16 $ 50.16
262-560-29 $ 51.77 $ 50.16 $ 50.16
262-560-30 $ 51.77 $ 50.16 $ 50.16
262-560-31 $ 51.77 $ 50.16 $ 50.16
262-560-32 $ 51.77 $ 50.16 $ 50.16
262-560-33 $ 51.77 $ 50.16 $ 50.16
262-560-34 $ 51.77 $ 50.16 $ 50.16
262-560-35 $ 51.77 $ 50.16 $ 50.16
262-560-36 $ 51.77 $ 50.16 $ 50.16
262-560-37 $ - $ - $ -
262-560-38 $ - $ - $ -
262-560-39 $ - $ - $ -
262-560-40 $ - $ - $ -
262-560-41 $ - $ - $ -
262-560-42 $ - $ - $ -
262-560-43 $ - $ - $ -
262-560-44 $ - $ - $ -
262-570-01 $ 51.77 $ 50.16 $ 50.16
262-570-02 $ 51.77 $ 50.16 $ 50.16
262-570-03 $ 51.77 $ 50.16 $ 50.16
262-570-04 $ 51.77 $ 50.16 $ 50.16
262-570-05 $ 51.77 $ 50.16 $ 50.16
262-570-06 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-570-07 $ 51.77 $ 50.16 $ 50.16
262-570-08 $ 51.77 $ 50.16 $ 50.16
262-570-09 $ 51.77 $ 50.16 $ 50.16
262-570-10 $ 51.77 $ 50.16 $ 50.16
262-570-11 $ 51.77 $ 50.16 $ 50.16
262-570-12 $ 51.77 $ 50.16 $ 50.16
262-570-13 $ 51.77 $ 50.16 $ 50.16
262-570-14 $ 51.77 $ 50.16 $ 50.16
262-570-15 $ 51.77 $ 50.16 $ 50.16
262-570-16 $ 51.77 $ 50.16 $ 50.16
262-570-17 $ 51.77 $ 50.16 $ 50.16
262-570-18 $ 51.77 $ 50.16 $ 50.16
262-570-19 $ 51.77 $ 50.16 $ 50.16
262-570-20 $ 51.77 $ 50.16 $ 50.16
262-570-21 $ 51.77 $ 50.16 $ 50.16
262-570-22 $ 51.77 $ 50.16 $ 50.16
262-570-23 $ 51.77 $ 50.16 $ 50.16
262-570-24 $ 51.77 $ 50.16 $ 50.16
262-570-25 $ 51.77 $ 50.16 $ 50.16
262-570-26 $ 51.77 $ 50.16 $ 50.16
262-570-27 $ 51.77 $ 50.16 $ 50.16
262-570-28 $ 51.77 $ 50.16 $ 50.16
262-570-29 $ 51.77 $ 50.16 $ 50.16
262-570-30 $ 51.77 $ 50.16 $ 50.16
262-570-31 $ 51.77 $ 50.16 $ 50.16
262-570-32 $ 51.77 $ 50.16 $ 50.16
262-570-33 $ 51.77 $ 50.16 $ 50.16
262-570-34 $ 51.77 $ 50.16 $ 50.16
262-570-35 $ 51.77 $ 50.16 $ 50.16
262-570-36 $ 51.77 $ 50.16 $ 50.16
262-570-37 $ 51.77 $ 50.16 $ 50.16
262-570-38 $ 51.77 $ 50.16 $ 50.16
262-570-39 $ 51.77 $ 50.16 $ 50.16
262-570-40 $ 51.77 $ 50.16 $ 50.16
262-570-41 $ 51.77 $ 50.16 $ 50.16
262-570-42 $ 51.77 $ 50.16 $ 50.16
262-570-43 $ 51.77 $ 50.16 $ 50.16
262-570-44 $ 51.77 $ 50.16 $ 50.16
262-570-45 $ 51.77 $ 50.16 $ 50.16
262-570-46 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-570-47 $ 51.77 $ 50.16 $ 50.16
262-570-48 $ 51.77 $ 50.16 $ 50.16
262-570-49 $ - $ - $ -
262-570-50 $ - $ - $ -
262-570-51 $ - $ - $ -
262-570-52 $ - $ - $ -
262-570-53 $ - $ - $ -
262-570-54 $ - $ - $ -
262-570-55 $ - $ - $ -
262-570-56 $ - $ - $ -
262-570-57 $ - $ - $ -
262-570-58 $ - $ - $ -
262-570-59 $ - $ - $ -
262-580-01 $ 51.77 $ 50.16 $ 50.16
262-580-02 $ 51.77 $ 50.16 $ 50.16
262-580-03 $ 51.77 $ 50.16 $ 50.16
262-580-04 $ 51.77 $ 50.16 $ 50.16
262-580-05 $ 51.77 $ 50.16 $ 50.16
262-580-06 $ 51.77 $ 50.16 $ 50.16
262-580-07 $ 51.77 $ 50.16 $ 50.16
262-580-08 $ 51.77 $ 50.16 $ 50.16
262-580-09 $ 51.77 $ 50.16 $ 50.16
262-580-10 $ 51.77 $ 50.16 $ 50.16
262-580-11 $ 51.77 $ 50.16 $ 50.16
262-580-12 $ 51.77 $ 50.16 $ 50.16
262-580-13 $ 51.77 $ 50.16 $ 50.16
262-580-14 $ 51.77 $ 50.16 $ 50.16
262-580-15 $ 51.77 $ 50.16 $ 50.16
262-580-16 $ 51.77 $ 50.16 $ 50.16
262-580-17 $ 51.77 $ 50.16 $ 50.16
262-580-18 $ 51.77 $ 50.16 $ 50.16
262-580-19 $ 51.77 $ 50.16 $ 50.16
262-580-20 $ 51.77 $ 50.16 $ 50.16
262-580-21 $ 51.77 $ 50.16 $ 50.16
262-580-22 $ 51.77 $ 50.16 $ 50.16
262-580-23 $ 51.77 $ 50.16 $ 50.16
262-580-24 $ 51.77 $ 50.16 $ 50.16
262-580-25 $ 51.77 $ 50.16 $ 50.16
262-580-26 $ 51.77 $ 50.16 $ 50.16
262-580-27 $ 51.77 $ 50.16 $ 50.16
ATTACHMENT F
Item 8.1
Mountain House LMD
Neighborhood D
Assessment District No. 2016
Assessment Roll
APN MAXIMUM TOTAL ASSESSMENT
ASSESSMENT
ACTUAL
ASSESSMENT
262-580-28 $ 51.77 $ 50.16 $ 50.16
262-580-29 $ 51.77 $ 50.16 $ 50.16
262-580-30 $ 51.77 $ 50.16 $ 50.16
262-580-31 $ 51.77 $ 50.16 $ 50.16
262-580-32 $ 51.77 $ 50.16 $ 50.16
262-580-33 $ 51.77 $ 50.16 $ 50.16
262-580-34 $ 51.77 $ 50.16 $ 50.16
262-580-35 $ 51.77 $ 50.16 $ 50.16
262-580-36 $ 51.77 $ 50.16 $ 50.16
262-580-37 $ 51.77 $ 50.16 $ 50.16
262-580-38 $ 51.77 $ 50.16 $ 50.16
262-580-39 $ 51.77 $ 50.16 $ 50.16
262-580-40 $ 51.77 $ 50.16 $ 50.16
262-580-41 $ 51.77 $ 50.16 $ 50.16
262-580-42 $ - $ - $ -
262-580-43 $ - $ - $ -
262-580-44 $ - $ - $ -
262-580-45 $ - $ - $ -
262-580-46 $ - $ - $ -
262-580-47 $ - $ - $ -
262-580-48 $ - $ - $ -
262-580-49 $ - $ - $ -
262-580-50 $ - $ - $ -
262-580-51 $ - $ - $ -
262-580-52 $ - $ - $ -
262-580-53 $ - $ - $ -
TOTAL $ 40,328.64
ATTACHMENT F
Item 8.1
LEGEND:
ASSESSMENT DISTRICT BOUNDARY MAP
NEIGHBORHOOD D
OF THE
MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT
CONSOLIDATED LANDSCAPE
MAINTENANCE ASSESSMENT DISTRICT NO. 2016
MOUNTAIN HOUSE, SAN JOAQUIN COUNTY
STATE OF CALIFORNIA
DATE: December, 2016
SHEET 1 OF 1
PG&E Corridor
ATTACHMENT
F
Item 8.1
ANNUAL ENGINEER’S REPORT
IN-TRACT AND OPEN SPACE
CITY OF MOUNTAIN HOUSE
CONSOLIDATED LANDSCAPE MAINTENANCE
ASSESSMENT DISTRICT NO. 2019
(Pursuant to the Lighting and Landscape Act of 1972)
PREPARED BY:
MACKAY & SOMPS
CIVIL ENGINEERS
PLEASANTON, CA 94588
May 14, 2025
ATTACHMENT G
Item 8.1
2025-2026_Consolidated MHCSD-LMD Rpt-Dist2019.doc 2 MacKay & Somps
TABLE OF CONTENTS
Table of Contents
ASSESSMENT DISTRICT AREA ......................................................................................5 DESCRIPTION OF LANDSCAPE IMPROVEMENTS ..................................................5 ADMINISTRATION ...........................................................................................................5 ESTIMATE OF ANNUAL COSTS ....................................................................................6 ANNUAL BUDGET AND TOTAL ASSESSMENT .......................................................6 FISCAL YEAR ASSESSMENT ROLL ...............................................................................6 AMENDMENTS TO ASSESSMENT DIAGRAM ...........................................................7 ANALYSIS OF GENERAL AND SPECIAL BENEFITS ................................................7 Table of Contents
TABLE 1: In-Tract Initial Assessment ............................................................................12 Open Space Initial Assessment .....................................................................13 TABLE 2: In-Tract Estimated Budget for Fiscal Year 2025-2026 ................................14 Open Space Estimated Budget for Fiscal Year 2025-2026 .........................15 TABLE 3: In-Tract General and Special Benefit Cost Estimate ..................................16 Open Space General and Special Benefit Cost Estimate ...........................17 EXHIBIT A: Initial Assessment Roll ...............................................................................18 EXHIBIT B: General and Special Benefit Zone .............................................................55 EXHIBIT C: Assessment District Boundary Map .........................................................56 EXHIBIT D: Assessment Diagram Special Benefit Zone .............................................60 EXHIBIT E: Landscape Plans ..........................................................................................87 EXHIBIT F: Assessment District Zone ...........................................................................94
ATTACHMENT
Item 8.1
G
ATTACHMENT
Item 8.1
G
2025-2026_Consolidated MHCSD-LMD Rpt-Dist2019.doc 4 MacKay & Somps To the Honorable Mayor and members of the City Council
of the City of Mountain House
Mountain House, California
Gentlepersons:
This Annual Engineer’s Report is for the City of Mountain House (previously the Mountain House Community Services District) which was incorporated in 2024. This report is prepared pursuant to and in compliance with the requirements of the “Landscaping and Lighting Act of 1972,” as amended, commencing with the Streets and Highways Code Sections 22500, et. seq. and with the provisions of Proposition 218 adding Article XIII D to the California Constitution.
This Annual Engineer’s Report is prepared for the creation of In-Tract and Open Space, City of Mountain House Consolidated Landscape Maintenance Assessment District No. 2019, herein subsequently referred to as District No. 2019, for the purpose of levying and collecting assessments each fiscal year to pay the costs of the annual maintenance and operation of the landscape improvements as shown in the approved Tentative Subdivision Map entitled “Tract, Mountain House, College Park.” Furthermore, the In-Tract landscape improvements shown in Table 1-A, Parcel F, H, J, L and the entry (from Tract 3605), Parcel B, C and the entry (from Tract 3606), Parcel D and E (from Tract 3607), Parcel C and the traffic circle (from Tract 3608), Parcel A (from Tract 3615), Parcel D (from Tract 3616), Parcel F, G and the entry (from Tract 3617) are identified herein in the attached Assessment Diagram as Parcel A and, hereinafter, is referred only as Parcel A. Also the In-Tract landscape improvements shown in Table 1-A, the landscape strips along portions of Grant Line Road, De Anza Boulevard, Teixeira Avenue and Central Parkway are identified herein in the attached Assessment Diagram as Parcel B and, hereinafter, is referred only as Parcel B. In addition, the Open Space landscape improvements as shown in Table 1-B, Parcel A (from Tract 3606), Parcel C (from Tract 3607), Parcel H (from Tract 3613), Parcels A, B, C and G (from Tract 3614), Parcel B (from Tract 3615), Parcels A and D (from Tract 3671), Parcels A and NN (from Tract 3670), Parcel A (from Tract 3616), Parcel E (from Tract 3617), the Community Park Corridor and the parcels in the future neighborhoods within Mountain House are identified herein in the attached Assessment Diagram as Parcel C and, hereinafter, is referred only as Parcel C. Also the Open Space landscape improvements shown in the Table 1-B, the Community Park and Neighborhood Park are identified herein in the attached Assessment Diagram as Parcel D and, hereinafter, is referred only as Parcel D.