24 City of National City Bicycle Master Plan
Figure 3-2: School and Park Facilities
Source: 2016/17 Citywide EngineerPage 1673 of 1838 ing and Traffic Survey
3.2 Transportation Network
National City currently has approximately 110 miles of paved streets and more than 90 signalized intersections. The existing roadway sys- tem generally follows a traditional grid pattern. The main regional freeway facilities through the city are I-5, I-805, and SR-54. Both I-5 and I-805 provide north-south movement while SR-54 is an east-west corridor.
Approximately 14 major arterial roadways provide circulation across the city and to major destination points throughout the region. These streets are typically four lanes and are generally spaced at half-mile in- tervals. The city is also served by approximately 31 collector roadways that operate as local conduits to take users in and out of neighbor- hoods and business districts and onto the arterial routes. These col- lectors are generally two-lane roads with signalized intersections. The street system includes major roadways, which are broken down into four classifications: freeways, arterials, collectors, and local roads.
All of the city’s arterials and collectors have posted speed limits en- forceable per the California Vehicle Code (CVC) and determined by an engineering traffic speed survey. Factors that are used to determine speed limits include 85th percentile speeds, collision data, and road- way conditions not readily apparent to drivers. Engineering and traffic surveys for speed limits are conducted once every five years by gov- erning municipalities in order to comply with Section 40802(a) of the CVC and the national Uniform Vehicle Code. Engineering and traffic surveys may be extended to every seven years or every 10 years if a registered engineer evaluates the section of the highway and deter- mines that no significant changes in roadway or traffic conditions have occurred.
A speed survey was conducted in 2016/2017 that updated posted speed limits throughout the City. The resulting city-wide posted speed limits can be seen in Figure 3-3. While these posted speed limits are current, the City is currently in the process of updating its city-wide speed survey and anticipates having that work completed this year.
26 City of National City Bicycle Master Plan
Figure 3-3: Posted Speed Limits
Chapter 3: Existing Conditions 27
3.3 Bicycle Facilities
3.3.1 Bikeways
National City is home to a range of bicycle facilities that create both local and regional bicycle connectivity. Improving these connections supports the city’s General Plan goal of creating successful complete “10 minute” neighborhoods, as well as the Climate Action Plan goals to reduce GHG emissions and VMT. National City is committed to enhancing local and regional bicycle connectivity and enhancing bicycle safety. From 2013-2022 the City constructed approximately 2.61 miles of new bicycle facilities.
Bicycle facilities within the planning area can be broken down into four classifications that are summarized below:
Class I Bike Path: Paved rights-of-way separated from the street Class II Bike Lane: On street facilities designed for bicyclists with striping and stencils
Class III Bike Route: Streets shared with motor vehicles that are designated for bicycle travel with signage
Class IV Cycle Track: Exclusive bikeway with a physical separation from motor vehicle travel lanes, parking lanes,
and sidewalks
In addition to the local serving bikeways, the planning area also contains two regional bikeways: The Bayshore Bikeway and the Sweetwater River Bikeway.
The Bayshore Bikeway is a 26-mile regional bicycle route that encircles San Diego Bay and passes through National City along Harbor Drive and Tidelands Avenue. The Sweetwater River Bikeway is located along the southern border of National City with segments in Chula Vista. It runs parallel with the Sweetwater River Flood Control Channel. This bikeway is approximately 1.7 miles long and varies between eight and ten feet in width. It connects to the Bayshore Bikeway at the Sweetwater Channel near the Gordy Shields Bridge. Figure 3-4 shows a map of the existing local and regional bikeways.
3.3.2 Bicycle Parking and End-of-Trip Amenities
An essential component of a robust bicycle network is parking and end-of-trip amenities. Users must be able to safely store their bicycles when riding to destinations, and amenities such as showers, charging facilities, and repair kits make bicycling more practical and attractive.
National City has limited bicycle parking facilities. Some bicycle parking and end-of-trip amenities such as showers and lockers are available at key employment and educational facilities, such as Southwestern Community College. SANDAG iCommute bicycle lockers are available at both of National City’s trolley stations. These lockers provide an enclosed parking space that is accessible by a mechanical or electronic key system for a monthly fee. They are available on a first-come, first-served basis. The 8th Street Trolley Station has four bicycle locker structures containing eight spaces. The 24th Street Trolley Station includes two bicycle lockers with four spaces. Figure 3-5 shows existing bicycle parking facilities.
3.3.3 Opportunities
In general, the grid layout of National City’s street network and relatively flat topography support bicycling. This section describes opportunities to improve bicycling in National City.
Roadway Characteristics
Many of National City’s roadways appear to have more vehicle capacity than is currently needed. For example, many residential and collector streets have curb-to-curb widths greater than 40 feet, which is wider than is needed to support on-street parking and one travel lane in each direction. These wide roadways present an opportunity to enhance multi-modal transportation options through relatively simple and inexpensive treatments, such as roadway restriping to accommodate bike lanes, bulb-outs to reduce vehicle speeds, bicycle markings and signage, and angled vehicle parking for bicycle safety.
28 City of National City Bicycle Master Plan
Figure 3-4: Existing Bicycle Facilities
Chapter
3: Existing Conditions 29
Figure 3-5: Existing Bicycle Parking Facilities
30 City of National City Bicycle Master Plan
Local streets with lower vehicle volumes and speeds create a more friendly environment for active transportation. Improving the roadway characteristics on these streets allows for the creation of low-stress community corridors that encourage active transportation modes. Providing such enhancements will improve the safety and comfort of bicycling throughout the city and is an opportunity to meet the growing needs of residents.
During engagement, community members cited vehicle speeds, lighting, and signal timing as safety concerns that create a barrier to bicycling and expressed a desire for additional bicycle facilities on the city’s roadways.
Topography
National City’s relatively flat topography makes bicycling an accessible mode of transportation for those with a variety of abilities. Steep or frequent hills present a barrier to bicycling because of the increased effort and skill necessary to pedal up and down them. National City has few hills and even fewer steep hills, making most of the city an ideal topography for bicycling. Furthermore, National City has a relatively flatter terrain than much of San Diego County. The few hills that the city does have are concentrated towards the city’s eastern border. Figure 3-6 shows the topography of National City in a contour map. Each brown line represents 20 feet of elevation and the numbers show the elevation at that location; the collection of lines shows where hills and valleys are. The closer together the lines are, the steeper the slope.
Areas with no contour lines are generally flat.
Regional Connectivity
SANDAG’s San Diego Regional Bike Plan establishes a vision for a diverse and interconnected regional bicycle system. In 2013, the City of San Diego completed a Bicycle Master Plan Update to reflect changes in bicycle user needs and make bicycling a more convenient transportation option. The 2020 update to the City of Chula Vista Active Transportation Plan focused on enhancing existing bicycle facilities while implementing new facilities based on demand and safety, which include connections to National City.
The regional corridors identified in these plans, discussed in Section
3.3 and illustrated in Figure 3-4, provide an opportunity to connect National City to neighboring communities and allow for enhancements such as regional wayfinding signage. Identifying local bikeways and treatments to improve local access to these regional facilities provides an opportunity to support inter-community bicycle travel for residents.
The Bayshore Bikeway provides a link to the nearby cities of San Diego, Coronado, Imperial Beach, and Chula Vista. This route also provides an alternative transportation option to many industrial and military job sites. The bikeway connects with the Sweetwater River Bikeway near National City’s southern border. The Sweetwater River Bikeway connects National City, unincorporated San Diego County, and Chula Vista.
Transit
National City is served by a regional transit system operated by the San Diego Metropolitan Transit System (MTS). Ten bus routes serve the city with 205 stops. Each bus stop presents an opportunity for multi-modal connections.
In addition, two MTS Trolley Stations, the 8th Street Trolley Station and the 24th Street Trolley Station, present an opportunity to improve bicycle access and support increased connectivity. Both of these transit stations have bicycle lockers available to the public. There is opportunity to improve bicycle access to both stations. Current Class II bicycle facilities on Wilson Avenue and 22nd Street, as well as Class II and III bike facilities along Mile of Cars Way, provide connections to the stations and support multi-modal connectivity. MTS trolleys can accommodate one to two bicycles per car. MTS buses accommodate two bicycles each. Providing more bicycle parking at trolley stations and along transit lines has the potential to increase ridership and enhance bicycle-transit integration.
A future high speed, high frequency transit mode is being planned as part of a SANDAG Comprehensive Multimodal Corridor Plan (CMCP).
While final recommendations for future stations and transit mode types are still being assessed, this plan will include bicycle facility recommendations in and around potential locations near Highland Avenue, Plaza Boulevard, and 8th Street.
Chapter
3: Existing Conditions 31
Figure 3-6: National City Topography
The existing and future transit stations and connections throughout the city create opportunities to provide first/last mile transportation improvements that encourage multi-modal trips. Such improvements consider a traveler’s entire trip, which often begins and ends with walking and/or bicycling. First/last mile transportation improvements, which can include bicycle infrastructure and wayfinding signage, antic- ipate the need for supporting the journey to and from transit stations in order to enhance the rider experience and encourage transit use.
Community Corridors
The National City street network includes a community corridor street typology in addition to the four roadway classifications. The commu- nity corridors classification is focused more on the qualitative charac- teristics of a roadway rather than the quantitative properties specified in the functional classifications. This street type is applied to arterials, collectors, and local streets and is intended to increase the comfort of walking and/or bicycling on these roads through traffic calming mea- sures such as on-street parking and bulb-outs; streetscape improve- ments such as landscaping, street trees, and medians; pedestrian en- hancements such as wider sidewalks and street furniture; and bicycle improvements such as designated bicycle lanes and bicycle rack facil- ities. Community corridors reflect the city’s commitment to reinvest- ing in its multi-modal network and adding to a sense of community identity with visible enhancements. Figure 3-7 identifies the location of existing designated community corridors in National City, as well as planned community corridors identified in the Transportation Ele- ment. Community corridors are subdivided into four categories (see Figure 3-8 through Figure 3-11): » “Main Street” Commercial Districts » “Main Street” Commercial Corridors » Multi-Modal Streets » Green Streets/Urban Trails 32 Page 1681 of 1838
Chapter
3: Existing Conditions 33
Figure 3-7: Community Corridors
34 City of National City Bicycle Master Plan
FIGURE 3-7: Community Corridors
Chapter 3: Existing Conditions 35
Figure 3-8: Main Street Commercial District Community Corridor Figure 3-9: Main Street Linear Commercial District Community Corridor
36 City of National City Bicycle Master Plan
Figure 3-10: “Multi-Modal Community Corridor” Figure 3-11: Green Street or Urban Trail Community Corridor
Chapter 3: Existing Conditions 37
Development
As new development and redevelopment projects occur, the city has an opportunity to ensure bicycle facilities are included through the plan review process. Smart growth - one of the General Plan’s key policy drivers - emphasizes the importance of linking land use and transportation improvements. The TODO Study is an example of the city’s efforts to encourage transit-supportive land uses and their connection to improved mobility. Among the goals of the TODO Study are developing housing and parking policies to be more supportive of smart growth, identifying key active transportation improvements, and creating smart growth and complete streets corridors with additional housing choices and improved connections to housing. The Focused General Plan Update identifies areas with strong potential and compatibility for infill, mixed-use, or higher density development sites and proposes rezoning them. These areas are in corridors throughout National City, including the eastern portions of the city where current land uses suggest that there is lower bicycling demand compared to the western portions. These planned zoning changes are anticipated to generate additional bicycling demand which should be addressed in the development of the bicycle network. Figure 3-12 displays the new zoning map from the Focused General Plan Update and existing citywide bicycle facilities.
3.3.4 Constraints
Although National City has many opportunities to improve the bicycle network, there are impediments to bicycle travel that require consideration.
Barriers
Several roadways in National City may present barriers to bicycle travel. These barriers can generally be categorized into three types:
Physical barrier: This type of barrier describes a physical impediment to travel such as where a roadway terminates or where crossings can only occur at freeway interchanges. I-5 and I-805 run north-south through the city while SR-54 runs east-west across the southern border. SR-54 limits local connectivity to the Sweetwater Bikeway. In addition to being a physical barrier, streets that cross I-5 and I-805 pose a safety concern that discourages bicycle use. Future bikeways that intersect I-5 and I-805 will require special attention to the configuration and treatments at interchange crossings. These future improvements will also be within Caltrans ROW and will require coordination.
Facility barrier: This type of barrier occurs where no bicycle facilities exist. This type of barrier restricts bicycle access to key community destinations.
Situational barrier: This type of barrier occurs where roadway widths, travel speeds, or other roadway characteristics make bicycle travel difficult. Plaza Boulevard and Highland Avenue are examples of situational barriers in National City.
On-Street Parking
Along some roadways in National City, existing public ROW widths may not be sufficient to accommodate both dedicated bicycle lanes and on-street parking. This constraint occurs on several streets in the city where bicycle connections are still desirable. If on-street parking is to be maintained, Class III bicycle routes or Class III bicycle boulevards may be used. On-street diagonal parking can also serve as a constraint since drivers’ visibility of bicyclists may be obscured when reversing out of a parking space. An additional buffer or back-in diagonal parking can enhance visibility. Diagonal parking exists adjacent to some bicycle-attracting land uses in the city such as National City Middle School on D Avenue.
38 City of National City Bicycle Master Plan
Figure 3-12: Focused General Plan Update Zoning and Existing Bicycle Facilities
Chapter 4
Needs and Demands
Analysis
40 City of National City Bicycle Master Plan
This section presents an estimate of current and potential bicycling demand in National City based on bicycle commute statistics and an assessment of population characteristics and land uses associated with higher rates of bicycling activity. Estimating how many people currently bicycle provides an indication of current system usage and establishes a baseline against which to measure progress. This section also identifies network gaps and roadway characteristics that serve as barriers to bicycling. Assessing demand and deficiencies is critical to identifying where facilities should be constructed or improved.
4.1 Bicycle Commuter Estimates
Given National City’s temperate climate and generally flat topography, bicycling is a strong mode to use for commuting to work. Since work commutes tend to be regular, analyzing bicycling as a means of transportation to work can provide reliable information about bicycle usage among working-age individuals.
The current bicycle commute trends in National City indicate the opportunity for increased future usage trends. While bicycle mode share is relatively low locally and nationally, the surveyed data, as seen in Table 4-1, indicates that National City has a higher bicycle commute mode share than both San Diego County and the United States. This data indicates that bicycle commute mode share could continue to outgrow and outpace local rates with targeted facility and amenity improvements.
To understand where usage trends may be most pronounced, and as part of the Focused General Plan Update, travel demand modeling was conducted with the current bicycle network to forecast commute mode share citywide and by City Master Geographic Reference Area (MGRA) for the year 2050. The modeled commute share citywide in 2050 for bicycles was approximately 0.4%. While this modeled citywide commute share is less than the surveyed commute share, bicycle trip propensity was mapped by MGRA and provides a blueprint for targeted facility and amenity improvements in strategic MGRAs to help citywide bicycle commute mode share grow.
4.2 Demographic Analysis
Understanding the demographic trends of National City residents is critical to planning bicycle facilities that serve community needs and aspirations. It is important to plan bicycle facilities that all community members can and want to use, regardless of their identities or socioeconomic circumstances. The following sections detail income and environmental indicators, which are key factors that are especially impactful on bicycling trends and directly inform the planning and design of bicycle facilities.
4.2.1 Income
People with lower incomes are more likely to face cost-related transportation challenges than those with higher incomes. For example, households with lower incomes may be more burdened by the cost of owning and operating a vehicle and therefore may be more likely to seek out alternative modes of transportation, such as bicycles. These households may also be more dependent on active transportation faTable 4-1: Means of Transportation to Work Data Mode United
States California San Diego
County
National
City
Bicycle 0.5% 0.8% 0.6% 0.7%
Drove Alone – Car,
Truck, or Van 74.9% 72.1% 73.9% 66.0%
Carpool – Car, Truck,
or Van 8.9% 10.0% 8.7% 15.5%
Transit 4.6% 4.6% 2.6% 5.1%
Walked 2.6% 2.5% 2.9% 7.0%
Other Means 1.3% 1.6% 1.7% 1.7%
Worked at Home 7.3% 8.4% 9.6% 4.1%
Source: American Community Survey 2020 5-Year Estimates, Table S0801
Chapter 4: Needs and Demands Analysis 41
cilities than those with higher incomes and may be more impacted by changes to the active transportation network. For the purposes of this analysis, household incomes are grouped into the following categories based on the Area Median Income (AMI) for a metropolitan area:
» Extremely Low: 0-30% of AMI
» Very Low: 31-50% of AMI
» Low: 51-80% of AMI
» Moderate: 81-120% AMI
» Above Moderate: Over 120% AMI
The term “lower income” is generally used to collectively refer to extremely low-, very low-, and low-income households. As shown in Table 4-2, approximately 73.0% of National City households fall into the lower income category while 27.0% fall into the moderate or above moderate category. Compared to the County’s overall percentage of lower income households (46.9%), National City has a significantly higher lower income population. Additionally, National City household incomes are typically less than those of the rest of the County. The median household income in National City is $47,119. The median household income for the County, however, is $78,890. National City’s median income is approximately 40.3% lower than the that of the County.
4.2.2 Environmental Indicators
Areas disproportionately affected by environmental pollution and other hazards have a strong opportunity to convert to private auto trips to alternative modes of transportation in order to help alleviate local pollution levels. Higher rates of active transportation use can positively impact the local environment and improve climate-related health outcomes for community members. Improving and expanding the local bicycle facility network can thus have positive impacts on local environmental pollution and related hazards and can provide more multi-modal opportunities for residents who live in disadvantaged areas.
CalEnviroScreen aggregates environmental, health, and socioeconomic data to assess the pollution burden of a community relative to other census tracts across the state. As shown in Figure 4-1, all census tracts within National City are within the 45th to 95th percentiles of the CalEnviroScreen 3.0 index, indicating significant pollution burden and vulnerability throughout the city. Compared to the region, National City has generally higher CalEnviroScreenscores: Chula Vista’s scores range from the 11th to 90th percentile, San Diego’s scores range from the 31st to 100th percentile, and Coronado’s scores range from the 1st to 10th percentile. The western portion of National City is among the top 25% of impacted tracts across the State of California identified by CalEnviroScreen 3.0. This area, shown in Figure 4-2, qualifies as both an SB 535 disadvantaged community and AB 1550 low-income community.
Income Category % of AMI National City (2) San Diego County (2) Extremely Low 30% AMI or less 4,980 29.9% 174,540 15.5% Very Low 31-50% AMI 3,445 20.7% 149,590 13.3%
Low 51-80% of AMI 3,735 22.4% 203,395 18.1%
Moderate or Above Over 80% of AMI 4,500 27.0% 597,760 53.1% Totals 16,660 100.0% 1,125,285 100.0%
(1) The AMI for a family of four in the San Diego region is $86,300. At the time of writing, the most recent year for which complete AMI data as shown is available is 2019. Source: San Diego Housing Commission, 2019 Area Median Income Limits. (2) Source: Department of Housing and Urban Development (HUD) and Comprehensive Housing Affordability Strategy (CHAS) (2015-2019).
Table 4-2: Households by Income Category
42 City of National City Bicycle Master Plan
Figure 4-1: CalEnviroScreen 3.0 Index
Chapter 4: Needs and Demands Analysis 43
Figure 4-2: SB 535 Disadvantaged Communities and AB 1550 Low-Income Communities
44 City of National City Bicycle Master Plan
4.3 Bicycle Propensity
Areas with high bicycle propensity are those with high potential for bicycle trips. When planning, designing, and investing in bicycle networks, it is most beneficial to focus facilities in areas with higher bicycle propensity. Factors discussed in Section 3, such as land use, topography, roadway characteristics, and existing facilities all affect bicycle propensity.
Regionally, bicycle use has been increasing recently. The number of regional bicycle trips had been trending upwards prior to the COVID-19 pandemic and further increased markedly in 2020, likely due in part to pandemic-related changing travel patterns. Figure 4-3 shows bicycle counts on regional facilities from 2016 through 2020. All measured regional facilities have seen increases in bicycle counts, with the Bayshore Bikeway, which runs through western National City, experiencing a significant increase in use.
Source: SANDAG 2020 State of the Commute Report
Figure 4-3: San Diego Regional Facility Bicycle Counts 2016 – 2020 Modeling from the Focused General Plan Update adopted land use scenario forecasts citywide bicycle trips in 2050 by MGRA, which is a geography developed by SANDAG that is between the scale of United States Census block groups and census tracts. Figure 4-4 displays the modeled bicycle trips with the existing bicycle network. This overlay shows that areas with existing bicycle facilities coincide with areas forecasted for higher numbers of bicycle trips. These areas have a higher bicycle propensity and should be further enhanced and expanded. Additionally, areas such as Las Palmas, Downtown, and the Plaza Boulevard Commercial District with higher forecasted bicycle trips have strong bicycle propensity and would benefit from additional facilities. These areas are key activity centers, with destinations such as shops, grocery stores, and schools.
Chapter 4: Needs and Demands Analysis 45
Figure 4-4: Existing Bicycle Facilities and 2050 Bicycle Trips to and from National City MGRAs
46 City of National City Bicycle Master Plan
4.4 Trip Detractors and Collision Analysis
This section describes key indications of bicycling barriers, such as roadways with high vehicular traffic volumes and speeds, freeway on/ off ramps, steep terrain, and bicycle collision locations.
4.4.1 Bicycle Trip Detractors
Figures 4-5 and 4-6, as well as Figure 3-6 on page 31, display roadway characteristics that negatively impact the quality of the bicycling environment and may deter people from bicycling in certain locations.
Freeways and railroad tracks act as hard infrastructure barriers that inhibit connected bicycle networks and travel. Streets with high average daily traffic (ADT) volumes can be less appealing for bicyclists due to safety and bicycle experience concerns. For the purposes of this study, streets with ADT volumes of greater than 7,500 are considered high volume streets. For similar reasons, high traffic speeds can also detract from bicycle trips. Locations in the eastern portion of the city with steeper terrain are more difficult to bicycle in as well.
Year
Total Collisions Total Bicycle-Related Collisions Bicycle-Related Percent of Total
Fatal
Bicycle-Related
Percent of Total
Fatal Injury Fatal Injury Injury
2013 2 187 0 27 0.0% 14.4%
2014 5 184 0 14 0.0% 7.6%
2015 0 186 0 14 0.0% 7.5%
2016 3 199 0 13 0.0% 6.5%
2017 6 205 1 16 16.7% 7.8%
Total 16 961 1 84 3.3% 8.8%
Source: City of National City
4.4.2 Bicycle Collisions
Table 4-3 presents the number of traffic collisions and collisions involving bicyclists in National City for five consecutive years: 2013, 2014, 2015, 2016 and 2017. As the table shows, one fatal bicycle-related collision was reported in National City during the five-year period in 2017.
This collision occurred on Grove Street as the vehicle involved was travelling at an unsafe speed. On average, about 9% of collisions resulting in injuries involved bicyclists. In 2013 there was a significantly higher rate of bicycle-involved collisions resulting in injury than in the proceeding four years, which have generally similar rates ranging from 6.5% to 7.8%.
Safety is a major concern for both existing and potential bicyclists.
Identifying the locations of bicycle collision sites can assist in developing improvements or determining more appropriate routes for bicyclists to use. Figure 4-7 on page 49 displays bicycle collision locations in National City during the same 2013 to 2017 period as shown in Table 4-3. Bicycle-involved collisions occurred at various intersections throughout the city, with hotspots occurring in the portion of the city to the west of I-805.
Table 4-3: National City Bicycle-Involved Collisions 2013 – 2017
Chapter 4: Needs and Demands Analysis 47
Figure 4-5: Bicycle Barriers and Steeps Slopes
48 City of National City Bicycle Master Plan
Figure 4-6: High ADT Volume Roadways
Chapter 4: Needs and Demands Analysis 49
Figure 4-7: 2013 – 2017 Bicycle-Involved Collisions
4.5 Bikeway Gaps
This section describes existing bicycle system gaps in National City that warrant consideration for bicycle facilities.
4.5.1 Bikeway Gap Types
Bikeway gaps exist in various forms, ranging from short “missing links” on a specific street or path corridor to larger geographic areas with few or no bicycle facilities. Gaps can be organized based on length and other characteristics. This document classifies bikeway gaps into five main categories:
Spot gaps: Spot gaps refer to point-specific locations lacking dedicated bicycle facilities or other treatments to accommodate safe and comfortable bicycle travel. Spot gaps primarily include intersections and other vehicle/bicycle conflict areas posing challenges for riders.
Examples include bike lanes on a major street “dropping” to make way for right turn lanes at intersections, or a lack of intersection crossing treatments for bicyclists on a route or path as they approach a major street.
Connection gaps: Connection gaps are missing segments (1/4 mile long or less) on a clearly defined and otherwise well-connected bikeway. Major barriers standing between bicycle destinations and clearly defined routes also represent connection gaps. Examples include bike lanes on a major street “dropping” for several blocks to make way for on-street parking, a discontinuous off-street path, or a freeway standing between a major bicycle route and a school.
Lineal gaps: Similar to connection gaps, lineal gaps are half- to one mile-long missing link segments on a clearly defined and otherwise well-connected bikeway.
Corridor gaps: Corridor gaps are missing links longer than one mile on a clearly defined and otherwise well-connected bikeway. These gaps will sometimes encompass an entire street corridor where bicycle facilities are desired but do not currently exist.
System gaps: System gaps are larger geographic areas (e.g., a neighborhood or business district) where few or no bikeways exist. System gaps exist in areas where a minimum of two intersecting bikeways would be required to achieve the target network density. 50 Page 1699 of 1838
Chapter 5
Recommended
Network and Facility Improvements
52 City of National City Bicycle Master Plan
The recommended improvements in this Bicycle Master Plan include bikeway network facilities, intersection and other spot improvements, and bicycle support facilities. National City’s temperate climate and gentle topography make it a great place to bicycle. The improved facilities outlined below will help make bicycling an effective transportation option throughout National City.
5.1 Bikeways
A comprehensive evaluation of existing conditions, including opportunities and constraints, was completed to identify locations for future bikeways and support facilities. The final recommended network provides for a well-connected citywide system. Improvement recommendations are based on best practices and are supplemented by:
» Review of existing planning efforts
» City staff/public input
» Field work and data analysis
» Local and regional network connections
The recommended bicycle network detailed in the following sections includes both facilities that are already planned, funded, and awaiting construction, and facility projects that are unfunded.
5.1.1 Recommended Network
National City’s current bikeway network includes 3.6 miles of Class I bikeways (bike paths), 12.7 miles of Class II bikeways (bike lanes), 4.7 miles of Class III bikeways (bike routes), and 0.4 miles of Class IV bikeways (cycle tracks). This plan recommends an additional 2.4 miles of Class I bikeways,
4.0 miles of Class II bikeways, 10.6 miles of Class III bikeways, 3.4 miles of Class IIIB bikeways (bicycle boulevards), and 5.6 miles of Class IV bikeways.
These additional facilities provide north-south and east-west corridors through the city as well as connections to regional facilities such as the Bayshore Bikeway and the Sweetwater River Bikeway. A comprehensive bikeway network improves bicyclists’ level of safety, convenience, and access to key destinations. It is important to note that bicyclists are legally entitled to ride on all city streets whether or not the streets are part of a designated bikeway network. Figure 5-1 shows the recommended bicycle network (both funded and unfunded projects) with Classifications for National City. The recommendations were developed based on the following guidelines:
» Needs of various user groups – Facilities addressing the needs of various types of bicyclists such that all people can use the city’s bicycle facilities
» Existing bicycling patterns – Preferred bicycling patterns, identified by the community in public workshops and by city staff » Connectivity – Increased system connectivity by providing bikeway connections to major destinations and to regional bikeways » Traffic volumes and travel speeds – Traffic volumes and travel speeds were taken into account in determining alignment and types of facilities. Research on the relationship between ADT and appropriate bikeways presented in the Federal Highway Administration’s (FHWA) 2019 Bikeway Selection Guide was used as a basis for establishing preferred facility types. Preference for Class III facilities was given to streets with ADT volumes below 3,500, preference for Class II facilities was given to streets with 3,500 – 7,500 ADT volumes, and preference for fully separated bicycle facilities was given to streets with ADT volumes greater than 7,500. While these ADT-based preferences were treated as such, ROW and other constraints on some segments of the recommended network led to some facilities being recommended that do not match this ADT breakdown
» Existing roadway width and ROW – Available ROW determines the type of facility and feasibility
» Public input – Public input on needs and recommendations used to help screen projects
Chapter
5: Recommended Network and Facility Improvements 53
Figure 5-1: Recommended Bicycle Network
1 1
Includes both funded and unfunded bicycle facility projects
54 City of National City Bicycle Master Plan
5.1.2 Bicycle Paths
Table 5-1 lists the recommended Class I Bicycle Path projects for National City. A bicycle path provides for bicycle travel on a paved
ROW completely separated from streets or
highways. These recommended facilities will
provide opportunities for recreational bicycling as well as for commuting and travel related to errands. The recommended network includes connections to the Bayshore Bikeway and Sweetwater River Bikeway.
5.1.3 Bicycle Lanes
Table 5-2 outlines the recommended Class II
Bicycle Lane projects for National City. Some
segments of identified projects are not Class
II; in these cases only the Class II portion of
the project is shown. Bicycle lanes provide
a signed, striped, and stenciled lane for
one-way travel on both sides of a street or
highway. Class II bikeways are typically recommended where traffic volumes require channelization of motorized and non-motorized users in order to enhance safety.
Location From To Mileage
Roosevelt Avenue Yama Street 8th Street 0.61
El Toyon-Las Palmas Bicycle
Corridor Multi-Use Path Beta Street 4th Street 0.52
Marina Way Recommended Class IV
Facility
Sweetwater River
Bikeway 0.46
Plaza Bonita Road Sweetwater Road Sweetwater River
Bikeway 0.31
Harbor Drive Bayshore Bikeway 14th Street 0.22
19th Street McKinley Avenue Wilson Avenue 0.12
Plaza Bonita Road Recommended Class I
Facility
Plaza Bonita Parking Lot
Entrance 0.10
McKinley Avenue 23rd Street Bay Marina Drive 0.07
Total 2.42
Table 5-1: Recommended Class I Bikeways
Table 5-2: Recommended Class II Bikeways
Location From To Mileage
24th Street Hoover Avenue Highland Avenue 0.69
L Avenue 16th Street 24th Street 0.50
Paradise Valley Road 8th Street Eastern city limit 0.47 Highland Avenue Delta Street 2ns Street 0.40
Highland Avenue 30th Street SR 54 exit ramp 0.39
16th Street Wilson Avenue National City Boulevard 0.31
Olive Avenue 8th Street Plumas Street 0.28
Bay Marina Drive Tidelands Avenue Harbison Avenue 0.25
Roosevelt Avenue 8th Street 12th Street 0.25
D Avenue 30th Street Southern terminus 0.23
Roosevelt Avenue Civic Center Drive 16th Street 0.19
Total 3.96
Chapter 5: Recommended Network and Facility Improvements 55 Table 5-3: Recommended Class III Bikeways
Location From To Mileage
8th Street Roosevelt Avenue Paradise Valley Road 2.29
16th Street Highland Avenue Harbison Avenue 1.46
Grove Street, Paradise Drive, T
Avenue
22nd Street 4th Street 1.28
Laurel Avenue, M Avenue, N
Avenue
Division Street 16th Street 1.15
Roselawn Street, 22nd Street,
Palm Avenue
L Avenue 8th Street 1.15
Lanoitan Avenue, Granger
Avenue, 24th Street
16th Street, 18th Street Euclid Avenue 1.13
Harbison Avenue, Earle Drive 4th Street 16th Street 1.02 Olivewood Drive, L Avenue 24th Street 30th Street 0.40
21st Street F Avenue L Avenue 0.38
Newell Street 18th Street 22nd Street 0.30
Highland Avenue 2nd Street 4th Street 0.13
Total 10.68
5.1.4 Bicycle Routes
Table 5-3 includes recommended Class III
Bicycle Routes for National City. Some segments of identified projects are not Class III; in these cases only the Class III portion of the
project is shown. Class III facilities are appropriate where there is limited available ROW for a dedicated lane or shoulder widening
but the route is an integral part of the bicycle
network. All recommended Class III segments
should be signed with Caltrans standard bicycle route signs. Where on-street parallel parking is present, shared-lane markings may
be placed. Appendix B provides guidance on
bicycle routes and shared lane markings.
5.1.5 Bicycle Boulevards
Table 5-4 includes recommended Class IIIB
Bicycle Boulevards for National City. Class
IIIB facilities are appropriate where there
are low vehicle volumes and speeds. They
use signage, traffic calming measures, and
pavement markings to give bicycles priority
on the road and limit through-usage of the
street by vehicles. Measures used to create
bicycle boulevards generally benefit other
active transportation modes as well.
Location From To Mileage
D Avenue Division Street 18th Street 1.13
18th Street Palm Avenue Rachael Avenue 1.00
F Avenue, 26th Street 18th Street 28th Street, D Avenue 0.72 24th Street Highland Avenue N Avenue 0.38
B Avenue 1st Street 4th Street 0.19
Total 3.41
Table 5-4: Recommended Class IIIB Bikeways
56 City of National City Bicycle Master Plan
5.1.6 Cycle Tracks
Table 5-5 includes recommended Class IV Cycle Tracks for National City. Class IV facilities are a hybrid between Class I separated bicycle paths and Class II on-street bicycle lanes. They are on-street exclusive bicycle facilities that are separated from vehicle traffic by a physical barrier, such as bollards, on-street parking, or raised pavers. They may be one-way or two-way and they may be at the street level, the sidewalk level, or in between. By physically separating bicyclists from vehicles, cycle tracks provide bicyclists increased feelings of comfort and security while not requiring construction outside of the roadway.
Table 5-5: Recommended Class IV Bikeways
Location From To Mileage
Sweetwater Rd 2nd Avenue, City
Boundary
City Boundary,
Plaza Bonita
Road
0.95 Hoover Avenue 22nd Street 33rd Street 0.76
30th Street Hoover Avenue Highland Avenue 0.70
Division Street Laurel Avenue Euclid Avenue 0.68
22nd Street Wilson Avenue D Avenue 0.57
McKinley Avenue 14th Street 23rd Street 0.55
19th Street Kidd Street McKinley Avenue 0.43
8th Street Rail tracks Roosevelt
Avenue
0.31 Civic Center
Drive
Tidelands
Avenue
Wilson Avenue 0.26
U Avenue Division Street 4th Street 0.25
Bay Marina Drive Marina Way McKinley Avenue 0.100
Marina Way Bay Marina Drive Recommended
Class I Facility
0.03 Total 5.58
5.2 Route Selection and Prioritization
This section outlines the prioritization methodology and the route selection criteria for the unfunded bikeway recommendations in this Bicycle Master Plan, as shown in Table 5-6 and Figure 5-2 on page 59.
The intent of the ranking process is to create a prioritized list of projects for funding and implementation. The project list and rankings are flexible concepts that serve as guidelines. The list may change over time because of changing bicycling patterns, implementation opportunities and constraints, and the development of other transportation system facilities. National City should review the project list at regular intervals to ensure it reflects the most current priorities, needs, and opportunities for implementing the bicycle network in a logical and efficient manner.
The recommended unfunded bikeway projects have been ranked using the following evaluation criteria:
» Previously identified in another plan or city document. Projects that have been previously identified scored higher
» Placemaking. Projects that directly connect to schools and parks scored higher
» Safety need. Projects in areas with more 2013 – 2017 collisions involving bicycles scored higher
» Bicycle propensity. Projects in areas with high modeled 2050 bicycle usage scored higher » Engineering feasibility. Projects with few high-level engineering-related complications scored higher » Regional connectivity. Projects that directly connect to existing regional bikeways scored higher
Chapter 5: Recommended Network and Facility Improvements 57 Scores for each evaluation criterion were compiled using adjustment factors to yield a composite score per project. The score for safety need was weighted the highest, and the scores for placemaking, bicycle propensity, and engineering feasibility were weighted the same.
The scores for previously identified in another plan or city document and regional connectivity were both weighted slightly lower, as they are less critical factors in bicycle facility prioritization. The evaluation criteria and detailed adjustment factors are shown in Appendix A. For clarity, the evaluation criteria scores in this chapter are presented as Harvey Balls rather than integers. Harvey Balls are pictographic ways of representing qualitative or quantitative comparisons in a visual format. They are circles with five degrees of solid black fill: empty, quarter filled, half filled, three quarters filled, and solidly filled. The more filled in a Harvey Ball, the higher ranked or scored the item is.
Table 5-6: Recommended Unfunded Bicycle Projects
Rank Project Name Facility
Type
Previously
Identified
Placemaking Safety Need Bicycle
Propensity
Engineering
Feasibility
Regional
Connectivity
Composite
Score
1 18th Street Bicycle Boulevard Class IIIB ● ● ● ◕ ◕ ● ◕ 2 8th Street Complete Street
Improvements
Class II
Class IIIR
◕ ● ● ● ◕ ◕ ◕
3 Highland Avenue Bike Lanes Class II ● ◕ ● ● ◑ ● ◕
4 F Avenue Bicycle Boulevard Class IIIB ● ● ● ● ◕ ◔ ◕
5 Las Palmas Bicycle Corridor Class IIIR ◕ ◕ ◕ ◕ ● ◑ ◕
6 D Avenue Bicycle Boulevard Class IIIB ◑ ● ● ◑ ◑ ◕ ◑
7 Division Street Cycle Track Class IV ● ◕ ◔ ● ◑ ● ◑
8 30th Street Cycle Track Class IV ◑ ● ◑ ● ◕ ◑ ◑
9 16th Street Bicycle Corridor Class IIIR ● ◕ ◑ ◑ ● ◑ ◑ 10 Granger Avenue Bicycle
Corridor
Class IIIR ● ◕ ◑ ◔ ● ◕ ◑
11 24th Street Complete Street
Improvements
Class II
Class IIIB
◕ ◑ ● ◕ ◑ ◑ ◑
12 Hoover Avenue Cycle Track Class IV ● ◑ ◔ ◕ ◑ ● ◑
13 22nd Street Cycle Track Class IV ● ◕ ◕ ◑ ◑ ◔ ◑
14 Harbison Avenue Bicycle
Corridor
Class IIIR ● ◑ ◔ ◑ ● ◑ ◑
15 Olive Avenue Bike Lanes Class II ● ◕ ◔ ◑ ◑ ◕ ◑
16 D Avenue Bike Lanes Class II ◑ ◔ ◑ ● ◕ ◑ ◑
58 City of National City Bicycle Master Plan
TABLE 5-6: Recommended Unfunded Bicycle Projects (Cont.) Rank Project Name Facility
Type
Previously
Identified
Placemaking Safety Need Bicycle
Propensity
Engineering
Feasibility
Regional
Connectivity
Composite
Score
17 Highland Avenue Complete
Street Improvements
Class II
Class IIIR
◕ ◔ ◕ ◑ ◑ ◕ ◑
18 19th Street Cycle Track Class IV ◑ ◔ ◑ ◕ ◑ ● ◑
19 B Avenue Bicycle Boulevard/
Advisory Bicycle Lanes
Class IIIB ● ◔ ◑ ◔ ● ◑ ◑
20 Bay Marina Drive Bike Lanes Class II ● ◔ ◑ ◑ ◑ ◕ ◑
21 Roosevelt Avenue North Bike
Lanes
Class II ● ◕ ◔ ◕ ◑ ◔ ◑
22 16th Street Bike Lanes Class II ● ◕ ◔ ◔ ◕ ◑ ◑
23 Civic Center Drive Cycle Track Class IV ◕ ◔ ● ◔ ◔ ◕ ◑ 24 Roosevelt Avenue South Bike
Lanes
Class II ◑ ◑ ◔ ◔ ◕ ◔ ◔
25 21st Street Bicycle Corridor Class IIIR ◑ ◔ ◔ ◑ ◕ ◔ ◔
Chapter 5: Recommended Network and Facility Improvements 59 Figure 5-2: Recommended Unfunded Bicycle Projects
60 City of National City Bicycle Master Plan
5.3 End of Trip and Support Facilities
Although the recommended network of routes, lanes, and paths will go a long way towards achieving the goals of making bicycling a viable mode of travel in National City, additional support is required. Support facilities and connections to other modes of transportation are essential components of a bicycle system. Improved bicycle connections with public transit will make it easier for residents to get around the city and the region while reducing the propensity for automobile use.
Support facilities, such as bicycle parking racks, showers and lockers for employees, and wayfinding further enhance safety and convenience for bicyclists and encourage bicycle use. With nearly all utilitarian and many recreational bicycle trips, bicyclists need secure, well-located bicycle parking. Recent bicycle enhancement projects throughout the city have implemented new bicycle racks. However, more secure parking in strategic locations is needed to enhance the bicycling environment.
Wayfinding signage enhances the ability to navigate through a region and is an important component of multi-modal connections. Bicycle wayfinding signs can serve as guides for bicyclists to navigate the city’s transportation network and to visually cue motorists that they are driving along a bicycle route. The recommended bikeway network interacts with city streets at a number of signalized intersections. Enhancements should be made to ensure that signals will change for bicyclists and give them adequate time to clear the intersection.
5.3.1 Multi-Modal Connections
Improving non-motorized access to transit is an important part of making bicycling a part of daily life in National City. Linking bicycles with public transit overcomes barriers such as trip distance, personal safety and security concerns, and riding at night, in poor weather, or up hills.
This link also enables bicyclists to reach more distant locations for both recreation and utilitarian purposes.
The 8th Street and 24th Street Stations of the San Diego Trolley are located greater than one-quarter mile (which is generally considered reasonable walking distance) from key destinations, such as the Plaza Bonita Mall. Both stations also have connecting bus service, underscoring the importance of providing improved bicycling connectivity to greatly increase the potential number of riders with access to bus stops and the trolley stations. The existing network includes links to the 24th Street Station. The recommended network includes additional links to this station, as well as new bicycle enhancements to connect to the 8th Street Station. The recommended network also crosses and connects to several major bus corridors, including Highland Avenue, Plaza Boulevard, and Euclid Avenue.
Through the 2021 Regional Plan, SANDAG has developed a transportation vision that includes a mobility hub recommendation in National City. Mobility hubs are transportation centers located in smart growth areas served by high frequency transit service. They provide an integrated suite of mobility services, amenities, and technologies that bridge the distance between transit and an individual’s origin or destination.
SANDAG’s Regional Mobility Hub Implementation Strategy identified potential mobility hub opportunities at the 8th Street Trolley Station.
As part of the ATP Cycle 6, National City was awarded funding to implement the 24th Street Transit Center Connections project. This project involves the creation of over two miles of Class IV bikeways, curb extensions near Sweetwater High School, new crosswalks with shortened crossing distances and surface improvements, signal and timing improvements, bicycle signals, road diets, and reconstructed ADA-compliant curb ramps. The integrated components of this project seek to provide safer, easier, and more convenient active transportation access and connection to the 24th Street Transit Center, as well as the Sweetwater River Trail, Paradise Creek Apartments, and Paradise Creek Park. It is expected to be completed in 2028.
Emerging Mobility and Micromobility
National City is committed to leveraging the continued advancements in emerging mobility and micromobility as tools for its smart growth
Chapter 5: Recommended Network and Facility Improvements 61 and climate action goals. Emerging mobility and micromobility provide additional access to the bicycle network and opportunities for links with transit. Encouraging the use of micromobility by developing programs, facilities, and connected paths will support the overall bicycle network. Similarly, integrating emerging mobility into the transportation network by investigating new technologies and programs can support alternative and active modes of transportation, such as bicycling.
The city is addressing multi-modal connections in current projects and plans. The Homefront to Waterfront Project addresses the need to support existing mobility services and incentivize the development and use of new mobility options. Some of the recommendations in the plan include the creation of mobility hubs/mini hubs that will connect transit, rideshare, micromobility services, Neighborhood Electric Vehicles (NEVs), and other bicycle facilities. The vision of these hubs is to provide and improve access to transit stops, bicycle parking, and micromobility parking, and to include wayfinding, greening, and other improvements to enhance the experience at these locations and encourage their use. Figure 5-3 illustrates potential intersection and midblock hubs.
5.3.2 Parking
During public engagement, community members consistently stated that parking and end of trip facilities limit their ability to use bicycles for short trips. Most of these short trips involve destinations - such as shops, restaurants, or schools – where people must leave their bicycles outside as they spend time inside at the destination. As indoor locations generally do not allow bicycles, community members may be unable to use their bicycles for trips that are accessible via bikeways but do not have bicycle parking infrastructure. Community members have noted that bicycle parking facilities would be especially beneficial at private land uses, such as supermarkets, apartment complexes, pharmacies, strip malls, and restaurants/fast food locations. This input directly correlates with the Transportation Element’s policies T-2.2, T-2.4, T-3.3, and T-10.3 as stated in Section 2.5.
National City currently has 76 bicycle racks, as shown in Figure 5-3.
As more bikeways are implemented, the need for bicycle parking will continue to increase. To meet current and future demand, the city should increase the number of public bicycle parking facilities by 30% by 2030.
Bicycle parking location recommendations have been developed based upon proximity to land uses that attract bicycle trips, including transit hubs and activity centers. The following locations would benefit from new or expanded bicycle parking facilities:
» Public transit stations, such as the 8th Street and 24th Street Trolley Stations » Recreation areas, such as Kimball Park, Las Palmas Park, Pepper Park, and El Toyon Park
» Schools, such as National City Middle School, Sweetwater High School, El Toyon School, and Southwestern Community College » Commercial/office areas, such as the shopping centers on Plaza Boulevard and Sweetwater Road and the Plaza Bonita Mall » The Downtown and Westside Specific Plan areas
It is recommended that more secure bicycle parking options, such as bicycle lockers, be provided at particularly high-activity locations such as transit stations. For guidance on bicycle parking design, installation standards, and types of short- and long-term bicycle parking options, please refer to Appendix B.
62 City of National City Bicycle Master Plan
Figure 5-3: Homefront to Waterfront Mobility/Mini Hub Typologies Source: Homefront to Waterfront plan
Chapter 6
Design Guidelines
64 City of National City Bicycle Master Plan
6.1 Design Guidelines
The design guidelines presented hereafter provide an exhaustive range of options for bicycle and trail treatments. Design guidelines are intended to be flexible and should be applied with professional judgment by designers, planners, and engineers. These guidelines do not specify what the city will implement on any given project, but rather provide a framework. Specific national and state guidelines are identified in this document, as well as a compilation of best practices.
The following key principles should be observed:
» The bicycle and trail network should enhance safety. Bicycle routes, pathways, and crossings should be designed, built, and maintained to be free of hazards and to minimize conflicts with external factors such as noise, vehicular traffic, and protruding architectural elements.
» The bicycle and trail network should be accessible. Bicycle routes, pathways, and crossings should ensure the mobility of all users by accommodating the needs of people regardless of age or ability. » The bicycle and trail network should connect to key destinations.
Convenient connections should be established between homes, schools, shopping districts, public services, recreational areas, and transit.
» The bicycle and trail network should be clearly identified and easy to use. Bicycle routes, pathways, and crossings should be signed and striped such that users can easily find a direct route to a destination to minimize delays. » Bicycle and trail improvements should be economical. Improvements should be designed to achieve the maximum benefit for their cost, including implementation and maintenance costs to reduce reliance on more expensive, less environmentally friendly modes of transportation. Where possible, improvements in the public ROW should stimulate, reinforce, and connect with adjacent private improvements.
6.1.1 National and State Guidelines/Best Practices
Federal Guidelines
» American Association of State Highway and Transportation Officials. (2018). AASHTO Policy on Geometric Design of Highways and Streets, 7th Edition. Washington, DC. https://store.transportation. org/item/collectiondetail/180
» American Association of State Highway and Transportation Officials. (2012). AASHTO Guide for the Development of Bicycle Facilities, 4th Edition. Washington, DC. https://store.transportation. org/Item/CollectionDetail?ID=116
» Federal Highway Administration. (2009). Manual on Uniform Traffic Control Devices (MUTCD). Washington, DC. http://mutcd.fhwa. dot.gov
» United States Access Board. (2013). Public Rights-of-Way Accessibility Guidelines (PROWAG). Washington, D.C. https://www.access-board.gov/files/prowag/PROW-SUP-SNPRM-2013.pdf State and Local Guidelines
» California Department of Transportation. (2020). Highway Design Manual (HDM), Chapter 1000: Bicycle Transportation Design. https://dot.ca.gov/-/media/dot-media/programs/design/documents/chp1000-a11y.pdf » California Department of Transportation. (2018). California Manual of Uniform Traffic Control Devices for Streets and Highways, Part 9: Traffic Controls for Bicycle Facilities https://dot.ca.gov/-/media/dot-media/programs/safety-programs/documents/ca-mutcd/ rev6/camutcd2014-part9-rev6.pdf
» California Department of Transportation. (2005) Pedestrian and Bicycle Facilities in California: A Technical Reference and Technology Transfer Synthesis for Caltrans Planners and Engineers. https://
Chapter 6: Design Guidelines 65
dot.ca.gov/-/media/dot-media/programs/safety-programs/documents/ped-bike/f0018152-technical-reference-a11y.pdf » National City Focused General Plan Update (2022). https://www. nationalcityca.gov/government/community-development/planning/focused-general-plan-update » San Diego Association of Governments (2010). San Diego Regional Bicycle Plan. https://www.sandag.org/-/media/SANDAG/Documents/PDF/projects-and-programs/bikeways-and-walkways/regional-bike-plan/san-diego-regional-bike-plan-riding-to-2050.pdf » San Diego Association of Governments. (2015). Wayfinding Design Guidelines. San Diego Regional Bike Network. https://issuu.com/ fehrandpeers/docs/sandag_bikewayfinding_dg
Best Practices
» Alta Planning + Design and the Initiative for Bicycle & Pedestrian Innovation (IBPI). (2009). Fundamentals of Bicycle Boulevard Planning & Design. https://nacto.org/wp-content/uploads/2012/06/Alta-and-IBPI.-2009.pdf » Association of Pedestrian and Bicycle Professionals (APBP). (2010).
Bicycle Parking Design Guidelines, 2nd Edition. https://www.apbp. org/Publications
» APBP. (2015). Essentials of Bike Parking: Selecting and Installing Bike Parking that Works. https://www.apbp.org/assets/docs/EssentialsofBikeParking_FINA.pdf » Caltrans. (2018). Complete Streets Elements Toolbox Version
2.0. https://dot.ca.gov/-/media/dot-media/programs/transportation-planning/documents/f0020348_complete-streets-elements-toolbox-a11y.pdf » City of Berkeley. (2017). Bicycle Facility Design Toolbox. https:// www.cityofberkeley.info/berkeleybikeplan/
» City of Chicago and the Pedestrian and Bicycle Information Center (PBIC). (2002). Bike Lane Design Guide. https://www.chicago.gov/ content/dam/city/depts/cdot/bicycling/publications/bike_lane_ design_guide.pdf
» City of Oakland. (2017). Design Guidelines for Bicycle Wayfinding Signage. http://www2.oaklandnet.com/oakca1/groups/pwa/documents/report/oak025118.pdf » City of Portland Bureau of Transportation. (2010). Portland Bicycle Master Plan for 2030. http://www.portlandonline.com/transportation/index.cfm?c=44597 » Federal Highway Administration. (2005). Report HRT-04-100, Safety Effects of Marked Versus Unmarked Crosswalks at Uncontrolled Locations. https://www.fhwa.dot.gov/publications/research/safety/04100/04100.pdf » Federal Highway Administration. (2001). Designing Sidewalks and Trails for Access. https://www.fhwa.dot.gov/environment/bicycle_ pedestrian/publications/sidewalk2/pdf.cfm
» United States Access Board. (2014). Accessibility Standards for Federal Outdoor Developed Areas https://www.access-board.gov/ files/aba/guides/outdoor-guide.pdf
» Federal Highway Administration. (2015). Separated Bike Lane Planning and Design Guide. https://www.fhwa.dot.gov/environment/bicycle_pedestrian/publications/separated_bikelane_pdg/ page00.cfm
» Institute of Transportation Engineers Pedestrian and Bicycle Task Force. (2002). Innovative Bicycle Treatments. https://trid.trb.org/ view/724395
» King, Michael, for the Pedestrian and Bicycle Information Center. (2002). Bicycle Facility Selection: A Comparison of Approaches.
Highway Safety Research Center, University of North Carolina – Chapel Hill. https://nacto.org/wp-content/uploads/2011/03/Bicycle-Facility-Selection-A-Comparison-of-Approaches-2002.pdf
66 City of National City Bicycle Master Plan
» Los Angeles County Metropolitan Transportation Authority (Metro). (2014). First Last Mile Strategic Plan and Planning Guidelines. http://media.metro.net/docs/First_Last_Mile_Strategic_Plan.pdf » Minnesota Department of Transportation. (2020). Bicycle Facility Design Manual. http://www.dot.state.mn.us/bike/bicycle-facility-design-manual.html » National Association of City Transportation Officials (NACTO). (2014). Urban Bikeway Design Guide. https://nacto.org/publication/urban-bikeway-design-guide/ » NACTO. (2017). Designing for all Ages and Abilities: Contextual Guidance for High-Comfort Bicycle Facilities. https://nacto. org/wp-content/uploads/2017/12/NACTO_Designing-for-All-Ages-Abilities.pdf » Rosales, Jennifer. (2006). Road Diet Handbook: Setting Trends for Livable Streets.
» All bikeway facilities are required, at a minimum, to meet the design guidelines outlined in the Caltrans Highway Design Manual and the California MUTCD. When considering design treatments not approved by the California MUTCD or the Highway Design Manual, National City must follow the protocol for testing innovative treatments specified by the State.
6.2 The Bicycle as a Design Vehicle
Similar to motor vehicles, bicyclists and their bicycles come in a variety of sizes and configurations. There are a variety of vehicle types, such as conventional bicycles, tandem bicycles, and recumbent bicycles. The behavioral characteristics and comfort levels of the bicyclists riding the vehicles also varies. When designing a bicycle facility, consideration should be given to vehicle types and skill levels of the bicyclists projected to use the facility.
6.2.1 Physical Dimensions
The operating space and physical dimensions of a typical adult bicyclist are shown in Figure 6-1. Clear space is required for the bicyclist to be able to operate within a facility. This constraint is why the minimum operating width for the facility is greater than the physical dimensions of the bicyclist. Although four feet is the minimum acceptable operating width, five feet or more is recommended. Outside of the design dimensions of a typical bicycle there are many commonly used pedal driven cycles and accessories that should be considered when planning and designing bicycle facilities.
Table 6-1 summarizes the typical dimensions for most commonly used bicycle design vehicles.
The most common types of bicycles, including tandem bicycles, recumbent bicycles, and trailer accessories are depicted in Figure 6-2 on page 68.
Figure 6-1: Standard Bicycle Rider Dimensions
Chapter 6: Design Guidelines 67
Table 6-1: Bicycle as Design Vehicle – Typical Dimensions Bicycle Type Feature Typical Dimensions
Upright Adult Bicyclist
Physical width 2 ft 6 in
Operating width (Minimum) 4 ft
Operating width (Preferred) 5 ft
Physical length 5 ft 10 in
Physical height of handlebars 3 ft 8 in
Operating height 8 ft 4 in
Eye height 5 ft
Vertical clearance to obstructions (tunnel height, lighting, etc.). 10 ft Approximate center of gravity 2 ft 9 in to 3 ft 4 in
Recumbent Bicyclist
Physical length 7 ft
Eye height 3 ft 10 in
Tandem Bicyclist Physical length 8 ft
Bicyclist with child trailer
Physical length 10 ft
Physical width 2 ft 6 in
Hand Bicyclist Eye height 2 ft 10 in
Inline Skater Operating width (sweep width) 5 ft
68 City of National City Bicycle Master Plan
6.2.2 Design Speed
The speed that various types of bicyclists can be expected to maintain under various conditions can also have influence over the design of facilities such as shared use paths. Table 6-2 provides typical speeds of various types of bicyclists for a variety of conditions.
Bicycle Type Feature Typical Speed
Upright Adult
Bicyclist
Paved level surfacing 15 mph
Crossing Intersections 10 mph
Downhill 30 mph
Uphill 5-12 mph
Recumbent Bicyclist Paved level surfacing 18 mph
6.2.3 Types of Bicyclists
The skill level of the bicyclist also impacts speeds and behavioral characteristics. There are several systems of classification currently in use within the bicycle planning and engineering professions. Classification systems are helpful in understanding the characteristics and infrastructure preferences of different bicyclists. However, it should be noted that classifications may change in type or proportion over time as infrastructure and culture evolve. Often, an instructional course can instantly turn a less confident bicyclist into one that can comfortably and safely share the roadway with vehicular traffic. Bicycle infrastructure should be planned and designed to accommodate as many user types as possible, with particular attention to the least confident users. Separate or parallel facilities should be considered to provide a comfortable experience for the greatest number of bicyclists.
The 2019 FHWA Bikeway Selection Guide identifies the following classification system for bicycle user types:
» Highly Confident Bicyclist (Very low percentage of population) – Characterized by bicyclists who generally choose the most direct route to a destination, even if it means riding in mixed traffic and/or on roadways with higher vehicle speeds and volumes. While these bicyclists often enjoy separated bikeways, they may avoid facilities they perceive to be too crowded with pedestrians or slower bicyclists or those that would involve deviating from a direct route to their destination. » Somewhat Confident Bicyclist (5-9% of population) – This user group is typically comfortable riding on most types of bicycle facilities, but usually prefer low traffic streets or separated bicycle lanes on higher volume streets when available. These riders may tolerate higher levels of traffic stress for short periods if it saves them from taking a non-direct route.
Table 6-2: Bicycle as Design Vehicle – Design Speed Expectations Figure 6-2: Various Bicycle Dimensions
» Interested But Concerned (51-56% of population) – This user group comprises the majority of the bicycling population and represents bicyclists who have the lowest tolerance for traffic stress. These bicyclists tend to generally avoid bicycling except on separated bikeways or very low-volume streets with safe crossings.
6.3 Routine Accommodation of
Bicyclists (Complete Streets)
Bicyclists have legal access to all public streets in National City. While this Bicycle Master Plan identifies a specific subset of streets to be designated as bikeways, many bicyclists will need to use other streets to reach their destinations. Therefore, it is important that all roadways be designed to accommodate bicyclists. The California Complete Streets Act of 2008 (AB 1358) mandates that cities plan for all users of roadways:
Commencing January 1, 2011, upon any substantive revision of the circulation element, the legislative body shall modify the circulation element to plan for a balanced, multimodal transportation network that meets the needs of all users of streets, roads, and highways for safe and convenient travel in a manner that is suitable to the rural, suburban, or urban context of the general plan.… For purposes of this paragraph, “users of streets, roads, and highways” means bicyclists, children, persons with disabilities, motorists, movers of commercial goods, pedestrians, users of public transportation, and seniors.
70 City of National City Bicycle Master Plan
Figure 6-3: Bicycle Lanes on One Side with Painted Buffer and Parallel Parking (72’ ROW, 60’ Curb to Curb) Figure 6-4: Bicycle Lanes with Angled and Parallel Parking and Painted Buffers on Both Sides (80’ ROW, 64’ Curb to Curb)
Chapter 6: Design Guidelines 71
Figure 6-5: Bicycle Lanes with Raised Medians on Both Sides (80’ ROW, 64’ Curb to Curb) Figure 6-6: Bicycle Lanes with Parallel Parking and Painted Buffers on Both Sides (80’ ROW, 64’ Curb to Curb)
72 City of National City Bicycle Master Plan
Figure 6-7: Bicycle Lanes with Painted Buffers on Both Sides and Median (100’ ROW, 80’ Curb to Curb) Figure 6-8: Bicycle Lanes with Parallel Parking on Both Sides (80’ ROW, 48’ Curb to Curb)
Chapter 6: Design Guidelines 73
Figure 6-9: Bicycle Lanes with Painted Buffers and Parallel Parking on Both Sides (100’ ROW, 64’ Curb to Curb) Figure 6-10: Bicycle Lanes with Parallel Parking on Both Sides and Median (80’ ROW, 60’ Curb to Curb)
74 City of National City Bicycle Master Plan
Figure 6-11: Bicycle Lanes on One Side with Buffer (80’ ROW, 54’ Curb to Curb) Figure 6-12: Bicycle Lanes on One Side with Buffer (80’ ROW, 48’ Curb to Curb)
Chapter 6: Design Guidelines 75
Figure 6-13: Multi-Use Path on One Side with Parallel Parking (60’ ROW, 40’ Curb to Curb) Figure 6-14: Bicycle Lanes with Painted Buffers and Parallel Parking on Both Sides, Center Turn Lane (80’ ROW, 64’ Curb to Curb)
76 City of National City Bicycle Master Plan
Figure 6-15: Bicycle Lanes with Buffers and Parallel Parking on Both Sides, Center Turn Lane (80’ ROW, 64’ Curb to Curb) Figure 6-16: Bicycle Lanes on One Side with Buffer and Parallel Parking (80’ ROW, 68’ Curb to Curb)
Chapter 6: Design Guidelines 77
6.4 Community Corridors
National City’s Focused General Plan Update includes a variety of roadway types designed to better accommodate pedestrians and bicyclists. Referred to as “Community Corridors,” these roadways represent complete streets with emphasis on traffic calming, streetscape enhancements, and improved walkability/bicycle access. Figure 3-7 on page 33 illustrates the Community Corridor network. Figures 6-3 through 6-16 illustrate options for reconfiguring roadways to enhance bicycle access. In many cases, it may be necessary to use minimum travel and turn lane widths in order to accommodate bike lanes. Whether or not minimum lane widths are acceptable should be determined on a case-by-case basis through sound engineering judgment and analysis of various site-specific factors including traffic speeds, parking demand and turnover, bus and truck volumes, etc.
6.5 On-Street Bicycle Facility Design
Guidelines
There are a variety of bicycle facilities and treatments available based on the desired level of protection or separation from automobile traffic. This section summarizes best practices for on-street bicycle facility design.
6.5.1 Facility Selection
There are a variety of techniques for selecting the appropriate type of facility or treatment. Roadway characteristics typically considered include:
» Motor vehicle speeds and volumes
» Presence of heavy vehicles/trucks
» Roadway width
» Parking
» Demand for bicycle facilities/user preference
» Land use - urban or rural context
Figure 6-17 on page 78 provides guidance from the FHWA’s 2019 Bikeway Selection Guide for how ADT and auto speed can influence preferred bikeway types for a location or corridor. The guide states that roads with higher speeds and ADT generally work best with more protective bikeways, while shared lanes or bicycle boulevards work best on roads with the lowest speeds and ADT. Bicycle lanes are best for roads with low speeds and low to moderate ADT, and separated bike lanes or shared use paths are best for roads with moderate to high speeds and high ADT. Facilities should be chosen based on anticipated comfort levels of less confident bicyclists so that people of all abilities are able to comfortably use the bicycle facilities; more protective facilities than strictly necessary may thus be recommended.
National City developed Bicycle Design Guidelines as part of the 2011 Bicycle Master Plan . Still relevant and accepted design guidance from those guidelines can be found in Appendix B. Designers should refer to these design guidelines and the latest guidance from the American Association of State Highway and Transportation Officials (AASHTO), California MUTCD, NACTO, and other design guidance documents listed in Section 6.1 and are subject to review by the City Engineer.
78 City of National City Bicycle Master Plan
Figure 6-17: Preferred Bikeway Types Based on ADT and Speed Chart assumes operating speeds are similar to posted speeds. If they differ, use operating speed rather than posted speed. Advisory bike lanes may be an option where traffic volume is <3K ADT.
Source: Bikeway Selection Guide, FHWA, 2019
Chapter 7
Recommended
Programs
80 City of National City Bicycle Master Plan
Improvements to bicycle facilities in National
City should be complemented by programs
designed to promote and encourage bicycling. The following narrative presents recommendations for education, encouragement, enforcement, and evaluation programs intended to promote bicycling and encourage the use of the infrastructure improvements
set forth in the National City Bicycle Master
Plan. These programs were originally developed in National City’s 2011 Bicycle Master Plan; as their implementation is still critical
for the city today, they have been reviewed
for inclusion in the 2022 Bicycle Master Plan
Update.
7.1 Safe Routes to School
Toolkit
SRTS is a program with a simple goal: helping more children get to school safely by walking and bicycling. Envision active kids
using safe streets, helped by engaged adults
(from teachers to parents to police officers),
surrounded by responsible drivers. SRTS programs use a variety of strategies to make it easy, fun, and safe for children to walk and
bicycle to school. These strategies are often
called the “Six Es:”
Engagement: strategies to listen to students, families, teachers, and school leaders and working with existing community organizations to build engagement opportunities.
Equity: strategies to ensure that SRTS initiatives are benefiting all demographic groups, with particular attention to ensuring safe,
healthy, and fair outcomes for low-income students, students of color, students of all genders, students with disabilities, and others.
Education: programs designed to teach children about traffic safety, bicycle and pedestrian skills, and traffic decision-making.
Encouragement: programs that make it fun
for kids to walk and bicycle. These programs
may be challenges, incentive programs, regular events (e.g., “Walk and Bike Wednesdays”), or classroom activities.
Engineering: physical projects that are built
to improve walking and bicycling conditions.
Evaluation: strategies to help understand
program effectiveness, identify improvements, and ensure program sustainability.
Who is This Toolkit For?
National City supports and encourages community partners and school districts to use this SRTS Toolkit to implement broader safety initiatives around schools. This Toolkit is for any adult who wants to improve traffic
safety and air quality around schools, help
children be more physically active and “ready
to learn,” and improve our neighborhoods.
Whether you are a parent, teacher, school
administrator, neighbor, public health professional, city staff, or a city official, this Toolkit will provide you with facts and figures, as Students enjoy the walk to school
A young student gets some exercise on his way
home from school
Chapter 7: Recommended Programs 81
well as ideas, inspiration, and proven techniques. This Toolkit covers the Why, Who and How of SRTS.
History of the Safe Routes to School
Movement
Based on the success of programs in New York,
California, and Florida, SRTS became a nationwide effort in 2005, when Congress included a national SRTS program in the reauthorization
of federal highway legislation. The program distributed $612 million in dedicated SRTS funds around the nation. As a result, every state has
a SRTS coordinator and a grant program. The
movement developed from a staggering decline over time in the proportion of schoolchildren walking and bicycling to school. In 1969, over 40% of schoolchildren walked or bicycled
to school. Today, that number has dropped
to almost 11%.1 As fewer kids bicycled and
walked, more were bused and, increasingly,
driven to school. Furthermore, children suffer
from a variety of problems related to physical
inactivity, and over 25% of morning rush-hour
traffic is parents driving children to school.
Traffic safety and air quality have declined near
schools. In the 1970s and 1980s, numerous European and British communities began to notice that children were no longer walking and bicycling to school. The first SRTS programs
1 McDonald, N. (2007). Active Transportation
to School: Trends Among U.S. Schoolchildren,
1969‐2001. American Journal of Preventative Medicine. 32(6) 509‐516; National Household Travel Survey (2017).
Students learn pedestrian safety lessons
inspired similar programs in Australia, Canada,
and the United States. In the US, the first SRTS
programs were implemented in New York City,
Florida, Marin County (CA), and Arlington (MA).
Benefits of Walking and Bicycling to
School
Active kids are healthy kids, and walking or
bicycling to school is an easy way to make
sure that children get daily physical activity.
Benefits to children include:
» Increased physical fitness and cardiovascular health » Increased ability to focus on school
» A sense of independence and confidence
SRTS also benefits neighborhoods:
» Improved air quality as fewer children are
driven to school
» Decreased crashes and congestion as
fewer children are driven to school
» More community involvement as parents,
teachers, and neighbors get involved and
put “eyes on the street”
Schools also benefit:
» Fewer discipline problems because children arrive “ready to learn” » Fewer private cars arriving to drop off
and pick up children
82 City of National City Bicycle Master Plan
» Opportunities to integrate walking, bicycling and transportation topics into curriculum (e.g. “Walk & Bike Across America,” mapping lessons, graphs and charts of distance walked or biked)
7.1.1 Overview of National City’s Existing Efforts
In the early 2000s, National City partnered with the National School District, Sweetwater Union High School District, school principals, parents, volunteers, and community organizations to create a SRTS Program Task Force. The initial goal of the Task Force was to identify barriers between school zones and feeder neighborhoods that precluded many children from walking to school. These meetings provided direction for city engineers and planners to collect data, perform site evaluations and develop projects to create safe walking corridors.
The efforts of the Task Force led to the completion of a number of engineering related improvements near schools to improve walking and bicycling conditions for school children. These improvements include the installation of vehicle speed feedback signs and flashing beacon combination units, vehicle speed feedback sign trailer units, pole-mounted flashing beacons, in-roadway lighted crosswalk systems, pedestrian countdown signal modules at intersections, school zone signing and striping enhancements, traffic calming bulb-outs and pedestrian refuge islands at school crosswalks, and pedestrian ramp and sidewalk improvements for schools citywide.
More recently, National City has also completed the Coolidge Avenue SRTS project and the Paradise Valley Road SRTS project, as well as a project with improvements focused in the western portion of the city.
The Coolidge Avenue SRTS project, completed in 2014, implemented enhanced crosswalks with high intensity signing and striping, wider sidewalks and pedestrian curb ramps, new lighting and landscaping, traffic calming measures such as corner bulb-outs, and decorative benches and bike racks. The Paradise Valley Road SRTS project, completed in 2016, implemented a new sidewalk, curb and gutter, and lighting along the west side of Paradise Valley Road between E. 8th Street and E. Plaza Boulevard to provide a gap closure along this key walking route to/from Ira Harbison Elementary School.
Example of a permanent radar speed feedback sign
The most recent SRTS project, completed in 2023, focused on addressing pedestrian barriers. It implemented high visibility continental crosswalks, ADA-accessible ramps with truncated domes, pedestrian crosswalk signs, and sidewalk replacement at locations near several elementary schools and Granger Junior High School.
Remaining planned infrastructure improvements include traffic calming and streetscape enhancements along various corridors near schools throughout the city. In order for the SRTS efforts in National City to be well-rounded and as robust as possible, infrastructure improvements should be complemented with school, local agency, and/ or parent-led efforts in the other five “Es:” engagement, equity, education, encouragement, and evaluation. The following Toolkit provides ideas and resources for implementing programs that will give parents and schoolchildren the information, confidence, and encouragement they need to make walking and bicycling to school a reality.
Chapter 7: Recommended Programs 83
7.1.2 Engagement
At its core, engagement is a relationship building exercise that begins with listening. Engagement takes a longer-term approach to providing opportunities for all viewpoints to be heard, and factors this into decision making in meaningful ways. All SRTS programs should begin with listening to and asking questions of students, families, teachers, school leaders, and community organizations. Robust community engagement is important to ensuring successful SRTS initiatives and can lead to:
» More vibrant, creative programs. Diverse perspectives, cultures, and upbringings are things to be celebrated and highlighted in SRTS programming, not managed or incorporated into mainstream culture. » Increased inclusivity and participation among the entire school community. When various perspectives are involved and listened to and programs grow, develop, and evolve with different lived experiences in mind, programs feel more accessible to people from all walks of life.
» Stronger buy-in, community champions, and ownership of changes. When community members are involved early in the process, it leads to a greater sense of ownership of a project or outcome. » Stronger, more trusting relationships with the community that will benefit not only your SRTS program, but can lay the groundwork for lasting partnerships and lead to mutual support for future efforts. » Using resources more efficiently and effectively. By involving community members’ perspectives early on, your program and community can avoid spending money on solutions that do not meet the community’s actual needs.
Community Engagement Strategies
A comprehensive engagement strategy includes efforts to:
» Make space. Invite members of the community to participate in SRTS planning and programming and actively prepare a space for them on your team. As you extend invitations to community members, be clear about how their perspective will inform the outcomes of the project and explain how you are prepared to offer mutual support for shared community goals.
» Step back. Recognize that sometimes, despite passion, content expertise, and experience, you are not the best person to lead a conversation or activity in or with a particular community. It can be more effective and respectful to let others with authentic ties to a particular community or neighborhood lead conversations, planning processes, and even programming. » Show up for issues not related to SRTS. Attend meetings of community organizations, even when they are considering issues not relevant to SRTS, to listen, understand needs, assist with their needs, and build relationships. Ask for input about SRTS at existing community meetings and events so you aren’t requiring people to attend another meeting to share their thoughts.
» Collaborate. Commit to making collaborative decisions with the input and full voice of community members. » Share (or relinquish) decision making power. Give community members the decision-making authority to chart the course of SRTS plans and programs and effectuate change in community. » Value differences. People experience life differently, and all lived experiences are valid. True community engagement aims to recognize, validate, and plan for the breadth of lived experiences rather than attempt to amalgamate them.
84 City of National City Bicycle Master Plan
» Invest for the long run. Make investments that go beyond gifts and incentives. For example, provide skill development training and financing for joint community initiatives, share materials and supplies that can be used for other types of community events, etc.
Engagement Resources
The Safe Routes Partnership is a national nonprofit organization working to advance safe walking and rolling to and from schools and in everyday life, improving the health and well-being of people of all races, income levels, and abilities, and building healthy, thriving communities for everyone. The Safe Routes for Youth Toolkit2
provides strategies
for engaging teens, building innovative partnerships, and designing and implementing programs. The Safe Routes Partnership Community Engagement Cards3
are a collection of arts-based activities that can be
used during engagement events to spark creativity and foster community. Cards give instructions for implementing a creative community engagement activity and are meant to be easily adapted to meet the needs of participants.
Engagement in the Six “Es”
Engagement is the foundation on which all SRTS programs should be built. Meaningful engagement will inform the remaining five “Es:” Equity: a diverse and robust engagement program provides a lens into the lived experiences and perspectives of others and helps to ensure that a SRTS program supports safe, healthy, and fair outcomes for students of color, students of all genders, students with disabilities, and others.
2 Safe Routes Toolkit: https://www.saferoutespartnership.org/sites/default/files/resource_files/safe_routes_for_youth_engaging_teens_in_vision_zero_final_web.pdf 3 Safe Routes Partnership Community Engagement Cards: https://www.saferoutespartnership.org/healthy-communities/safe-routes-engagement-cards#:~:text=Weather%20Photo%20Contest-,Safe%20Routes%20Community%20Engagement%20Cards,in%20a%20variety%20of%20settings.
Education: in addition to safety education for students, SRTS programs should consider the best ways to educate the community, reaching them where they are and in the languages they speak.
Encouragement: students of color, with disabilities, and of varying sexualities and genders should see themselves represented in encouragement efforts. Leaders of these communities should be invited to participate or lead these efforts.
Engineering: proposed engineering changes should serve all populations, being mindful of changes that may inadvertently affect certain populations’ ability to reach critical services, and prioritizing areas most in need of improvements.
Evaluation: the community should be involved in identifying evaluation methods and how to measure program success.
Students help with a Share the Road campaign
Chapter 7: Recommended Programs 85
7.1.3 Equity
A focus on equity is a key component of sup-
porting the creation of healthy, thriving com-
munities for people of all ages, races, ethnic-
ities, incomes, and abilities. The addition of
this E to the SRTS strategies in recent years
helps to ensure that underserved communi-
ties and schools can advance SRTS.
Practices to Promote Equity
Selection of Schools
Children from low-income families are more
likely to walk to school, but often face poor-
er infrastructure and more safety challenges
on their route to school. SRTS programs have
the potential to advance equity in commu-
nities but must recognize their potential to
exacerbate disparities if investments are not
prioritized in low-income communities or de-
signed to serve the needs of different demo-
graphic groups.
The 2019 National Program Assessment Re-
port found that 60% of SRTS programs indi-
cated they work with schools that express
interest in the program.
4 Using expressed
interest as a selection factor may lead to in-
creased disparities if more affluent schools
are targeted because they have more knowl-
edge of and ability to engage with these pro-
grams. Selection should include factors that 4
National Program Assessment Report: https://www.
saferoutespartnership.org/sites/default/files/re-
source_files/national_srts_census_report_final.pdf
advance equity and address communities
with the most need, such as economic fac-
tors.
Targeted Engagement and Programming
A targeted approach is an important tool to
encourage participation by a range of demo-
graphic groups. Engaging a diverse group of
community members as part of the engage-
ment strategies can help to promote activi-
ties for underserved groups and identify spe-
cific needs of different groups.
Reduce Barriers to Participation
Accessible infrastructure and tools should
meet the needs of all individuals to allow for
greater participation. Strategies can include
providing students with free or low cost re-
sources such as bicycles - including adaptive
bicycles to allow students of all abilities and
experiences to participate - helmets, locks,
and skills classes and other educational tools.
Ensuring that all materials are translated into
languages that meet the needs of the com-
munity is also important for expanding the
reach of SRTS programs and breaking down
barriers to participation.
7.1.4 Education
SRTS refers to a variety of multi-disciplinary
programs aimed at increasing the number
of students walking and bicycling to school.
Education programs are an essential compo-
nent of a SRTS program. Education programs
generally include outreach to students, par-
Bicycle safety education
Safe Crossing Lesson
86 City of National City Bicycle Master Plan
ents and guardians, and motorists. Students
are taught bicycle, pedestrian, and traffic
safety skills. Parents and motorists receive
information on transportation options and
driving safely near schools.
7.1.5 Safety Education
Pedestrian and bicycle safety education
aims to ensure that each child understands
basic traffic laws and safety rules. Pedestrian safety education teaches children basic traffic safety rules, sign identification, and
decision-making tools. Pedestrian training is
typically recommended for first and second
graders and teaches basic lessons such as
“look left, right, and left again,” “walk with
your approved walking buddy,” “stop, look,
and listen,” and “lean and peek around obstacles before crossing the street.” Trained safety professionals can administer pedestrian safety in the classroom or physical education class. Classroom teachers may use established pedestrian safety curriculum, such as the curriculum taught by The Street Trust5
to make sure children know how and where
to walk and cross the street.
The San Diego County Bicycle Coalition provides a number of bicycle education resources for students of all ages.6 Their Elementary
Safety Assembly is geared for grades K-3 and
5 Bicycle Transportation Alliance safety courses:
https://www.thestreettrust.org/bicycle-safety
6 San Diego County Bicycle Coalition: https://sdbikecoalition.org/classes-workshops/ covers the basics of pedestrian and bicycle
safety, including a helmet fitting demonstration, bicycle safety talk, pedestrian safety talk, and interactive intersection crossing demonstration involving bicycles and pedestrians. The middle and high school workshops address the basics of riding a bicycle, including laws, bicycle handling tips, bicycle
maintenance, sustainability, and health.
Safe Moves7
is a local resource in pedestrian
and bicycle safety education for children. This
resource develops and provides a variety of
programs, including bicycle safety seminars
and rodeos, lesson plans uniquely designed
for each age group and grade level, parent
education, and public awareness campaigns.
Bicycle Rodeos
Bicycle Rodeos are family-friendly events
that incorporate a bicycle safety check, helmet fitting, instruction about the rules of the road, and an obstacle course. Adult volunteers can administer rodeos or they may be offered through the local Police or Fire
Department. Bicycles rodeos can be incorporated into health fairs, back to school events, and Walk and Bike to School days. Rodeos
also provide an opportunity to check children’s bicycles and instruct them on proper helmet use.
7 Safe Moves: https://safemoves.org/
School Zone Traffic Safety Campaign
A School Zone Traffic Safety Campaign creates awareness of students walking and bicycling to school. A safety campaign is an effective way to reach the general public and encourage drivers to slow down and look for
students walking and bicycling to school. A
School Zone Traffic Safety Campaign uses
signs and banners located near schools (for
example, in windows of businesses, yards of
people’s homes, and print publications) to remind drivers to slow down and use caution in school zones. This campaign can be kicked
off at the start of each school year or in conjunction with special events, such as Walk and Bike to School Month, which takes place
in October. Banners and signs can be effecBus safety campaign
Chapter 7: Recommended Programs 87
tive tools to remind motorists about traffic
safety in school zones. Large banners can be
hung over or along roadways near schools
with readable letters cautioning traffic to
slow down, stop at stop signs, or watch for
students in crosswalks with memorable messages such as: “Give Our Kids a Break,” and “Drive 25, Keep Kids Alive.”
Bus Safety Campaign
Many schools use buses to transport students
who are too far away to walk to school. School
buses are large and restrict sight lines for drivers, pedestrians, and bicyclists. It is difficult for drivers and students to see each other
around school buses. Schools can implement
a bus safety campaign that reminds students
to walk and ride cautiously around buses and
to wave and communicate to the bus driver.
7.1.6 Encouragement
Encouragement programs focus on bringing
the fun back to walking and bicycling while
increasing public awareness of the benefits
of walking and bicycling to school. Events
and activities help increase the number of
students walking and bicycling to school. The
activities often include a variety of special
events and contests, outreach campaigns,
and presentations to school and community groups. Encouragement programs can be used to educate parents, school personnel, students, and the community about the health and safety benefits of a successful
SRTS program. Encouragement programs
do not need much funding but their success
depends on a school champion or group of
volunteers for sustained support.
Walk and Bike to School Day/Week/
Month
Walk and Bike to School Day/Week/Month
are special events encouraging students to
try walking or bicycling to school. The most
well-known of these events is International Walk to School Day, a major annual event that attracts millions of participants in over
40 countries in October. Walk and Bike to
School Days can be held yearly, monthly, or
even weekly, depending on the level of support and participation from students, parents, and school and local officials. Some schools organize more frequent days – such
as weekly Walking/Wheeling Wednesdays
or Walk and Roll Fridays – to give people an
opportunity to enjoy the event on a regular
basis. Parents and other volunteers accompany the students and staging areas can be designated along the route to school where
groups can gather and walk or bicycle together. These events can be promoted through press releases, articles in school newsletters,
and posters and flyers for students to take
home and circulate around the community.
Information about International Walk to
School Day can be found at: http://www.
walkbiketoschool.org/.
Suggested Route to School Maps
Suggested Route to School maps show stop
signs, signals, crosswalks, sidewalks, trails,
overcrossings, paseos, and crossing guard locations around a school. These maps can be used by families to identify the best way to
walk or bicycle to school. Cities and school
districts sometimes cite liability concerns as
reasons to not publish walking route maps.
While no walking route will ever be completely free of pedestrian safety concerns, a well-defined walking route should provide
the greatest physical separation between
walking students and traffic, expose students to the lowest traffic speeds, and have the fewest roadway crossings.
Walk and Bike to School Day celebrations
88 City of National City Bicycle Master Plan
Friendly Walking/Bicycling Competitions (Incentive
Programs)
Contests and incentive programs reward students by tracking the number of times they walk, bicycle, carpool, or take transit to school.
Contests can be individual, classroom competitions, or inter-school competitions. Local businesses may be willing to provide incentive prizes for these activities. Students and classrooms with the highest percentage of students walking, bicycling, or carpooling compete for prizes and “bragging rights.” Small incentives, such as shoelaces, stickers, and bicycle helmets, can be used to increase participation. It can also be effective to allow different grades and schools (high school vs. grade school vs. middle school) to compete against each other in a mobility challenge.
Each of the examples of programs below can be modified for students who live too far away from school to walk or bicycle. Modification can include walking or bicycling at lunch time or gym class. Students can also count miles walked or bicycled with parents and guardians outside of the school day. Examples of walking and bicycling competitions include:
On-campus walking clubs (mileage clubs) - Children are issued tally cards to keep track of “points” for each time they walk, bicycle, bus, or carpool to or from school. When they earn a specified number of points, they get a small prize and are entered in a raffle for a larger prize. At the end of the school year, there is a drawing for major prizes.
Pollution Punchcard - This year-round program is designed to encourage school children and their families to consider other options for getting to school, such as bicycling, walking, carpooling, and public transportation. Every time a student walks, bicycles, or carpools to school, a parent volunteer or school representative stamps or punches the card. Students receive a reward when the punch card is complete.
Walk and Bike Challenge Week/Month - This month-long encouragement event is generally held in conjunction with National Bike Month Example of a Pollution Punchcard
Source: Pollution Punch Card Program Guidebook, Sonoma County Safe Routes to School,2015.
Example of a Frequent Rider Miles sheet
Chapter 7: Recommended Programs 89
in May. Students are asked to record the number of times they walk and bicycle during the program. The results are tallied and competing schools or classrooms compare results. Students who are unable to walk or bicycle to school because they live too far away can participate by either walking during a lunch or gym period or getting dropped off near the school and walking with their parents the last several blocks.
Golden Sneaker Award - Each class keeps track of the number of times the students walk, bicycle, carpool, or take the bus to school and compiles these figures monthly. The class that has the most participation gets the Golden Sneaker Award. The award can be created by taking a sneaker, mounting it to a board like a trophy, and spray painting it gold.
Walk Across America/California/Pacific Crest Trail - This is a yearround program and is designed to encourage school children to track the number of miles they walk throughout the year. Students will be taught how to track their own mileage through learning about how many steps or blocks are in a mile and will also learn about places in the United States on their way. Teacher or volunteer support is required.
Each of these programs can use incentives to increase participation and reward the students for their efforts. Examples of incentives include:
» Shoelaces
» Dog tags
» Pedometers
» Reflective zipper pulls
» Bicycle helmets
» Raffle tickets for a bicycle from a local bicycle shop » Early dismissal
» Extra recess time
» Pizza parties
Physical activities before school are part of the friendly competition Bicycles around a school campus
90 City of National City Bicycle Master Plan
Back-to-School Blitz
Families set transportation habits during the
first few weeks of the school year, and many
families are not aware of the many transportation options available to them. As a result, most families will develop the habit of driving to school. A “Back to School Blitz” can be used at the beginning of the school year to
promote bus, carpool, walking, and bicycling
as school transportation options. The “Back
to School Blitz” includes many of the other
programs in this Toolkit, including Suggested
Route Maps, articles in school newsletters,
and encouragement activity. A packet can
also be given to each family containing information about school transportation options, such as:
» Cover letter signed by the principal encouraging parents to create transportation habits with students that promote physical activity, reduce congestion, increase school safety, and improve air quality
» School transportation maps or suggested routes to school maps that include bicycling and walking routes, transit and
school bus stops, drop-off and parking areas, and bicycle parking locations » Transit schedules
» Pledge forms about reducing the number of times that families drive to school; entries go into a raffle for a prize donated by local businesses In addition to the packet, the following strategies can be included:
» Table at back-to-school night with materials and trained volunteers who can answer questions about transportation
issues
» Post “schoolpool map” showing all student households as dots; parents then check the corresponding school directory listing to see families located in their neighborhood who are interested
in walking, bicycling, and carpooling to
school together. Only families who opt
into the directory are listed
» Article in first school newsletter about
transportation options and resources
» Enforcement activities, such as school
zone speed and crosswalk enforcement
» Strict enforcement of parking policies during first month of school (and throughout the year if possible)
Stop and Walk
This year-round campaign is designed to encourage parents to stop several blocks from school and walk the rest of the way to school.
Not all students are able to walk or bicycle
to school. They may live too far away from
A schoolpool map from Marin County shows area
neighborhoods and student household locations
Students show their coloring job of a street scene
Chapter 7: Recommended Programs 91
school to walk or their route to school may include hazardous traffic situations, such as a high-speed arterial road with limited crossing opportunities. This type of campaign is used to allow students who are unable to walk or bicycle to school a chance to participate in school walking programs. It also helps reduce traffic congestion at the school.
The program can be included as a part of other encouragement activities, such as the Golden Sneaker Award, Walk Across California, and the Mileage Clubs. An additional benefit to implementing a “Stop and Walk” program is reduced traffic volume directly surrounding a school.
Reducing the number of motor vehicles in the school environment increases traffic safety and encourages walking and bicycling to school.
Walking School Buses
Parents and guardians often cite distrust of strangers and the dangers of traffic as reasons why they do not allow their students to walk to school. Walking school buses are a way to make sure that children have adult supervision as they walk to school. Walking school buses are formed when a group of children walk together to school and are accompanied by one or two adults (usually parents or guardians of the children on the “bus”). As the walking school bus continues on the route to school they pick up students at designated meeting locations.
Walking school buses can be informal arrangements between neighbors with children attending the same school or official school-wide endeavors with trained volunteers and structured meeting points with a pick-up timetable. A walking school bus “how to” guide is available om the National Center for Safe Routes to School.8
8 National Center for Safe Routes to School “how to” guide: http://www.pedbikeinfo. org/pdf/SRTSlocal_WalkingSchoolBus_guide.pdf
Students participate in a walking school bus
Students participate in a bicycle train
92 City of National City Bicycle Master Plan
Bicycle Trains
A bicycle train is very similar to a walking school bus. Groups of students accompanied by adults bicycle together on a pre-planned route to school. Routes can originate from a particular neighborhood or, in order to include children who live too far to bicycle, begin from a park, parking lot, or other meeting place. They may operate daily, weekly, or monthly. Bicycle trains help address parents’ concerns about traffic and personal safety while providing a chance for parents and children to socialize and be active. Bicycle trains are best suited for older students who have undergone bicycle safety training. Helmets and parent waivers should be required before participating in a bicycle train.
7.1.7 Engineering Tools
The environment near the school is often a determining factor when a parent or guardian decides whether or not to allow their child to walk or bicycle to school. There are a variety of engineering solutions available to enhance pedestrian and bicyclist safety and comfort near schools. Engineering improvements are implemented to slow cars, increase the visibility of students walking and bicycling, and make it easier for students to cross the street. While some engineering efforts can be costly, many, such as posting signs and striping crosswalks or bicycle lanes, are relatively inexpensive.
Lower-Cost Pedestrian and Bicycle Safety Enhancements
Designated on-street bicycle facilities can provide a space for older or more experienced children to bicycle on the street. Pedestrian and bicycle safety improvements include:
Bicycle Lanes and Routes
A Bicycle lane is a striped portion of the roadway that designates an area specifically for bicyclists, making them more visible to motorists.
Bicycle lanes are better suited for older and more experienced children who have learned the skills needed for bicycle handling, avoiding road hazards, and following the rules of the road. Bicycle lanes can be Example of a bulb-out at an intersection
Bicycle Lanes
Chapter 7: Recommended Programs 93
striped on any street that meets the width
requirements and has the characteristics of
a good bicycle route. Bicycle routes provide
for shared use of the travel lane with motor
vehicles and are identified by signage and/or
shared lane markings only.
Secure Bicycle Parking
Providing a secure and convenient location
for bicycle parking is one way to help encour-
age more children to bicycle to school. Good
bicycle parking is located conveniently (near
the school entrance, for example), and pro-
tects bicycles from vandalism/theft, damage,
and weather.
High-Visibility School Zone Signage
Signs inform street users about what to ex-
pect from the street surroundings. School
zone signs notify motorists that they are
entering an environment where there are
vulnerable road users such as children. The
city is required to follow guidelines listed in
the California MUTCD when installing signs.
Key school zone sign assemblies include the
School Warning, School Crosswalk Warning,
School Speed Limit, and School Advance
Warning. One way of increasing the visibility
of school area signage is through the use of
fluorescent, yellow-green signs.
Sidewalks
Sidewalks create a designated space for pe-
destrians. A complete sidewalk network is an
important component of the transportation
system for students. An incomplete sidewalk
network or sidewalks in disrepair create a
hazard for students walking and bicycling
and may force students to walk in the road-
way.
Trails and Paseos
Trails, pathways, and paseos are often
viewed as recreational facilities, but they can
also serve an important function as a walking
and bicycling corridor to school. Multi-use
pathways and paseos are designed to serve
both bicyclists and pedestrians and provide
additional width over a standard sidewalk.
Pathways may be constructed adjacent to
roads, through parks or open space areas,
along creeks, or along linear corridors, such
as abandoned railroad lines. Regardless of
the type, pathways constructed next to the
road should have some type of buffer to sep-
arate the path area from the adjacent travel
lane.
High-Visibility Crosswalk Striping
High-visibility striping makes crosswalks
more noticeable to motorists. According to
the California MUTCD, crosswalks located on
roads within a certain distance of a school
may be painted yellow. Several different
crosswalk striping patterns can be used – the
most common types of crosswalk striping
patterns are shown in the diagram to the
right. The standard crosswalk striping pat-
tern consists of two parallel lines, called the
“transverse” pattern. A number of “high-visi-
bility” patterns are also available, such as the
High-visibility school zone signs
Sidewalk near school
High-visibility crosswalk striping
94 City of National City Bicycle Master Plan
ladder, zebra, and continental patterns, which add bars for increased visibility. High-visibility markings should be considered for all high-volume crossings near schools, as well as where the conditions warrant an increased visibility marking (e.g. a mid-block location). Standardizing crosswalk markings helps both motorists and pedestrians recognize designated crossings.
Pedestrian-Scale Lighting
Safe sidewalks are essential components of good pedestrian environments, and well-lit environments convey a feeling of comfort and safety, particularly at night. Lighting should illuminate the sidewalk and roadway crossings to increase pedestrian visibility. Lighting is also an important element for multi-use pathways, at underpasses, and at other isolated locations. Lower-level pedestrian-scale lights can be mounted separately or on typical street light poles to extend over the sidewalk to increase pedestrian visibility to road users and enhance visibility along the walking path.
Advance Stop Bars and Yield Lines at Mid-Block Crosswalks Advance stop bars and yield lines enhance pedestrian safety by prompting motor vehicles to stop/yield well in advance of marked crosswalks, thereby providing a clearer line of sight to pedestrians entering the crosswalk. Without an advance stop bar or yield line, drivers may decide to stop right at the crosswalk, which may obstruct visibility for vehicles traveling in the inside lane of a multi-lane roadway, increasing the possibility of a vehicle-pedestrian collision. Stop bars are used at signalized mid-block crosswalks and should be accompanied by a “Stop Here for Pedestrians” sign. Yield lines, also known as “shark teeth” due to their triangular shape, are used at unsignalized/uncontrolled mid-block crosswalks and should be accompanied by a “Yield Here to Pedestrian” sign. Advanced stop bars and yield lines should be placed between 20 and 50 feet in advance of the crosswalk based on roadway conditions.
Advance Stop Bars
Example of a countdown signal head
Chapter 7: Recommended Programs 95
Traffic Signal Enhancements
Pedestrian Countdown Signals
Pedestrian countdown signals provide pedestrians information about how much time they have left to cross the street. Young pedestrians are still learning the skills needed to be a safe pedestrian. Without proper information, a flashing hand can confuse some child pedestrians and lead to running in the crosswalk in order to complete the crossing before the signal changes. Countdown signals help children make good decisions about whether or not to enter the crosswalk by displaying to them how much time they have left to cross the street.
Leading Pedestrian Interval
A Leading Pedestrian Interval (LPI) is an option that can be added to a traffic signal. An LPI gives pedestrians a walk signal before the motorists get a green light, which makes pedestrians more visible to motorists and therefore makes motorists more likely to yield to them.
Pedestrian-Only Signals
One type of pedestrian-only signal is called a HAWK (High-intensity Activated Crosswalk). It can be used at midblock crossings with high pedestrian volumes or at intersections that do not already have a traffic signal. Pedestrians use a push button to activate the warning signal and motorists receive a flashing red light and then a solid red light.
When the motorists have a solid red light, pedestrians then see a white “walk” symbol, letting them know they are allowed to cross the street.
After pedestrians have finished crossing the street, motorists then receive a blinking red light that lets them know that they may proceed when safe. The HAWK signal has been implemented in a number of cities and is included in the federal and California MUTCD guidelines for pedestrian traffic signals.
Loop Detectors/Video Detectors for Bicycles
Where a minor road crosses a major road at a signalized intersection, the light on the minor road will turn green when a vehicle is present if proper detection has been installed. Often, the devices that detect vehicles (loop detectors or video detectors) don’t detect smaller objects, like bicycles. These devices should be calibrated to detect bicyclists. Loop detectors are in-pavement devices used at intersections that are actuated by the presence of a vehicle in the roadway to allow the vehicle to “trip” the signal and receive a green light. When a bicyclist stops over a properly calibrated loop detector, the detector uses a magnetic field to detect the metal frame of the bicycle and turns the signal green. Video detectors are mounted on a traffic signal standard and can typically detect bicycles over a larger area than loop detectors can. Video detectors, when positioned properly, will also turn the light green for a bicyclist.
Crossing over a freeway
96 City of National City Bicycle Master Plan
Grade-Separated Crossings
Occasionally, it may be necessary to raise or
lower a pedestrian crossing above or below
the existing street level using a pedestrian
bridge or underpass. Due to their high costs,
grade-separated crossings should only be
considered when there are no alternative
routes, such as at a freeway, major highway, rail line, or waterway, and pedestrian/ bicycle demand is high. Even in these cases,
pedestrian-only grade-separated crossings
should be built only after careful consideration. Those that require significant elevation change, such as to cross over a freeway, may be a challenge to construct due to ADA
requirements for slopes and vehicle transitions. Ultimately, pedestrian facilities should be incorporated into existing and new vehicle crossings where feasible.
Traffic Calming
Traffic calming measures are physical improvements to roadways and/or intersections intended to enhance pedestrian and bicyclist safety by slowing vehicles through
narrowing the roadway cross-section and/
or horizontal deflection and reducing cutthrough traffic on local neighborhood streets. Types of traffic calming include:
Medians and Pedestrian Refuge Islands
Medians and pedestrian refuge islands are
located at an intersection or in the middle of
a block. Medians are curbed areas in the center of the roadway that reduce the roadway width and speed of traffic. Pedestrian refuge
islands are medians with a cut-out (“refuge”)
for pedestrians. Pedestrian refuge islands are
often used with a marked crosswalk and are a
minimum of four feet wide. They enhance pedestrian safety by creating a curb-protected location in the middle of the street. This facility
allows pedestrians to cross one lane of traffic
at a time. They are best used on higher volume
streets with high-visibility crosswalks and signs.
Curb Extensions/Bulb-outs
Curb extensions, often referred to as bulbouts, have many benefits for pedestrians. They force vehicles to slow down by narrowing
the roadway cross section, shorten the street
crossing distance for pedestrians, provide additional space at corners, allow pedestrians to see and be seen before entering the crosswalk,
and simplify the placement of curb ramps.
Speed Tables and Speed Cushions
Speed tables and cushions slow vehicles by
forcing them to go over a raised surface.
Speed tables are longer and wider than jarring speed bumps found in locations like parking lots. They are generally used on lower volume streets and may not be permitted or advised on larger or higher-volume streets.
Chicanes
Chicanes are two curb extensions or roadside islands that create a serpentine path for autos. Street traffic must slow down in order
to effectively maneuver around the in-street
Example of a Pedestrian Refuge Island
Example of a chicane
Chapter 7: Recommended Programs 97
barriers. Chicanes are typically used on collectors and local streets near school sites.
Pinch Points
Pinch points are very similar to chicanes. While chicanes are offset curb extensions, pinch points are paired curb extensions or roadside islands used create a single auto lane. Pinch points slow traffic by reducing the width of the street. They are appropriate for neighborhood streets.
Traffic Circles
Traffic circles are in-street speed reduction devices used at intersections, typically in residential neighborhoods. They slow traffic because vehicles must “deflect” to go around them. Traffic circles can also be used to visually enhance the street using plantings or public art.
Single Lane Roundabouts
Roundabouts can be used at intersections as an alternative to traffic signals, particularly if signal warrants are not met. They reduce the speed of traffic while maintaining traffic flow for all approaches. They also provide refuge islands making it easier for pedestrians to cross.
They can be used on low- and high-traffic volume roads. Pedestrian safety is improved due to decreased vehicle speeds.
7.1.8 Evaluation
Evaluation of the SRTS program is important to understand its effectiveness, identify necessary improvements, and ensure that the program can continue in the long-term. Evaluation can measure shifts in travel behavior, changes in attitudes toward bicycling and walking, awareness of the SRTS program, grant money received, and projects completed.
School Site Audit
A school site audit, sometimes called a walking audit or walkabout, is an evaluation of the pedestrian and bicycling conditions around the school environment. Typically, school site audits are conducted by a local school group or task force on foot by walking the routes that students use to get to school. A site audit may also be conducted on bicycle in order to better evaluate bicycling conditions.
The goal of a site audit is to document conditions that may discourage walking and bicycling to school and to identify solutions to improve those conditions. The audit should involve an assessment of the built environment around a school (e.g., streets, sidewalks, pathways, crosswalks and intersections, bike routes, traffic controls), drop-off and pick-up operations (e.g. presence of designated loading areas), as well as behaviors of students, parents, and motorists that could contribute to hazardous conditions for bicyclists or pedestrians (e.g. speeding, jaywalking, failure to yield to pedestrians).
Crossing guards help students navigate busy roads near schools
98 City of National City Bicycle Master Plan
A school site audit checklist form asks for detailed information related to:
1) Student drop-off and pick-up areas
2) Bus loading zones
3) Sidewalks and bicycle routes
4) Intersections and crosswalks near the
school property
5) Sight distance
6) Traffic signs and signals, speed controls,
and pavement markings
The local school task force can use the school
site audit checklist as a basis for conducting
their walkabout.
Along with the checklist, an aerial map of the
school area is helpful for the site audit. Aerial
photos can be marked up with identified issues and suggested improvements.
Program Evaluation
There are many different education and encouragement programs that can be implemented in a school environment to help increase the number of students walking and bicycling to school. Not every program is the
correct fit for every school. It is important
to evaluate programs in the context of the
school environment prior to deciding what
would be a good choice for each school.
Once the programs have been implemented
it is necessary to evaluate what worked well
and where improvements can be made. Below are some suggested steps for proceeding with the program evaluation process.
Program evaluation can be administered by
following these steps:
1) Survey local traffic conditions and issues
(much of this information can be found
from the school site audit)
2) Determine the goals of the program
3) Identify methods to implement the programs
4) Determine success benchmarks to evaluate the effectiveness of the program 5) Interview program administrators (teachers, volunteers) and participants (students) to discuss what worked well and what did not
Perform Annual Hand Tally and
Parent Surveys
Since 2005, the Federal Safe Routes to School
program has set aside federal funding to help
states, cities, towns, and schools increase the
number of students walking and bicycling
to school. One requirement of receiving this
money is that schools must perform annual
hand tally and parent surveys so that the national program can track the effectiveness of the various programs across the country.
The National Center for Safe Routes to School
has developed a recommended methodology, survey, count forms, and reporting forms.9 A teacher administers the hand tally survey
to the students in the classroom. The parent
surveys are either mailed or sent home with
students to give to parents or guardians.
7.2 Policies
The policies in this chapter focus on methods to ensure that vehicle traffic, busing and transit, and walking and bicycling to school
are conducted in the safest and most efficient way possible. Many of the identified policies focus on vehicle pick-up and drop-off
activities. Implementing policies can often be
low cost, although they may involve a greater outlay of staff resources and new procedures may take time to gain acceptance.
Parent Drop-off/Pick-up Operations
Creation of a parent drop-off/pick-up loop
can help maximize capacity and safety and
minimize delay in drop-off and pick-up operations. The loop can be either a dedicated lane just for pick-up/drop-off or a portion of the
larger parking lot that has been marked with
cones to serve as the pick-up/drop-off loop.
Having supervisors present can help to ensure that loading/unloading moves forward smoothly, efficiently, and safely.
9 National Center for Safe Routes to School recommended data collection methodology: http://guide. saferoutesinfo.org/pdf/SRTS-Guide_Evaluation.pdf
Chapter 7: Recommended Programs 99
Signs outside the school inform parents about pickup and drop-off procedures Students assist with the drop-off process
Cones mark the dedicated bus zone
Valet Drop-off
Valet drop-off is a technique to improve traffic
flow within the drop-off and pick-up loop by
assisting students into and out of vehicles. A
“valet” is present at the pick-up/drop-off area
to open car doors and assist students into and
out of arriving vehicles, improving traffic flow.
The valet system eliminates the need for parents to get out of the vehicle to open the door for a child and remove bags or other items.
The valet system is typically staffed by school
staff or parent volunteers who can quickly
and efficiently move children into and out of
vehicles and hold onto backpacks and other
items. Some schools use older grade students
as valets, such as 5th or 6th graders. However,
student volunteers must get out of class early
to prepare for pick-up. A supplement to the
valet system is a nameplate in the vehicle window that identifies what student needs to be picked up. This nameplate allows the valet to
find students and bring them to the vehicle as
it arrives.
Platooning Drop-off/Pick-up System
In a platooning system, all vehicles are unloaded/loaded simultaneously, then proceed to the exit. If a vehicle unloads or loads more
efficiently than the vehicle in front of it, the
rear vehicle must wait for the lead vehicle to
finish the unloading/loading, then follow it
out of the loop. This tool is best used to control the parent inclination to always drop-off and pick-up the student directly in front of
the school. Often, additional curb loading is
available downstream of the school and is severely underutilized, creating excess congestion and delay prior to entering the loop. At least two monitors are needed to effectively
operate the vehicle platoon – one at the loop
entrance to direct the maximum number of
vehicles into the loop for a single cycle, and
a second to ensure that the lead vehicle proceeds to the front-most loading stall.
Dedicated Bus Zones
Establishing separate areas for vehicular and
bus traffic can help improve traffic flows in
the pick-up/drop-off area. Conflicts often ocPage 1748 of 1838 100 City of National City Bicycle Master Plan
cur when private vehicles and buses arrive at the same time and in the same location. Separating traffic often necessitates establishing an onstreet bus zone dedicated solely to buses. Private vehicles should not be allowed to load/unload in the bus zone. Bus zones need to be large enough to accommodate all the buses that might be parking there at one time. Sometimes it is possible to stagger the arrival times of the buses, thus requiring less space. The zones must be clearly marked and there should be adequate sidewalk space for students to wait for the bus.
Staggered Bell Times
Staggered bell times can help to disperse the traffic peak at schools with a large student population or when two or more schools are in close proximity to one another. For a single school application, students’ start and end times should be grouped by grade levels. The start times of these groups should be at least 15 minutes apart. This staggering allows the vehicles from the first group to leave the school or be completely out of the area by the time the second group arrives.
With multiple schools, staggering the bell times can be coordinated among two or more schools to ensure that significant numbers of vehicles do not use competing transportation facilities simultaneously.
7.2.1 Detailed Implementation Example
Establishing a Walking School Bus
How does the walking school bus program work?
A walking school bus is a group of children walking to school with one or more adults. The “bus” follows the same route every time and picks up children from their homes at designated times. Children like the walking school bus because it gives them active social time before the school day begins (or, as one participating child put it, “it’s like recess before school!”). Adults like the walking school bus because they feel more comfortable with children walking when there are trained, trustworthy adult escorts. Teachers and principals like the walking school bus because it helps kids arrive ready to concentrate on school.
How can we get started with a walking school bus?
Ideally, the program should run every day so that families can count on it. However, it is possible to start small by selecting one or two days per week, and/or by targeting specific neighborhoods (e.g. a housing Pedestrian Safety Training (walking school bus)
Chapter 7: Recommended Programs 101
development close to the school) as a way to begin developing the program. Start with a special one-time walking school bus, such as for International Walk to School Day in October, is also possible.
A walking school bus can be an informal effort led by a few parents in one neighborhood. For a school-wide program, however, it is important to designate a coordinator. In some cases a dedicated volunteer coordinator can be successful, but it is highly recommended that this be a paid position to ensure consistency and reliability. Some programs only travel to school because many children have after-school programs, go somewhere other than their home after school, or may not have a parent waiting for them at home.
One way to increase participation is to designate a “bus stop” where families who live far from the school can drop off children to join the bus. A park or community center (with parking facilities) is ideal for this purpose.
What planning needs to happen?
The walking school bus coordinator should begin by assessing both resources (such as parent volunteers) and interest. A school-wide survey distributed to parents can help to identify interested households and volunteers.
Sample survey: http://saferoutespartnership.org/sites/default/files/ pdf/wsb_student_and_family_survey.docx
When interested households have been identified, the school coordinator should map out draft walking routes. Walking routes should be sited on streets with complete pedestrian facilities, prioritizing safe crossings and lower traffic speeds and volumes, as well as low-crime streets. Stops may either be at each child’s house (which is more convenient for parents but may take longer) or at gathering points (e.g. one meeting place per block, as well as gathering spaces at parks). Finalized routes and stop locations should be mapped out for parent and volunteer reference.
Once routes have been developed and the number of children on each route has been determined, the coordinator should decide how many adults will be needed for each route. The US Center for Disease Control recommends one adult per three children for children ages 4 to 6 and one adult per six children for older elementary children ages 7 to 9.
Walking school bus organizers should work closely with the school district to address liability concerns. The school district risk management specialist should be able to figure out if the program can be covered under the existing liability coverage, and, if not, what options exist.
Partnership with a third party (such as the PTA or the city) may also allow access to existing liability coverage. Parents should also sign permission slips and liability waivers (the exact language should be determined by the risk manager).
Who are the bus “drivers?”
Bus “drivers” (route leaders) are usually volunteers, but it is important to make sure that the volunteers are dedicated, responsible, and well-supported. Some communities have had outstanding success partnering with a local college or university, where volunteers are recruited at the beginning of the semester each year. While students do not receive payment, they may receive college credit, which can increase their commitment to the program. An active senior group may also be a good partner organization to find volunteers who are available during the day. Interested parents are also natural volunteers. It is also an option to pay route leaders a small stipend (as some crossing guard programs do).
The school coordinator should screen each potential volunteer through an interview and criminal background check. All route leaders must also attend a detailed training covering:
102 City of National City Bicycle Master Plan
» The goals and outline of the walking school bus program » Expectations for route leaders
» Traffic safety and group management techniques
» Emergency procedures (including injury protocol and what to do if a route leader cannot serve on a given day)
» Alternate school schedule and inclement weather policy » What to do if a child is late or if a child’s behavior is inappropriate » Any tracking protocols that should be followed (such as a daily attendance worksheet) The coordinator should also provide first aid kits and safety vests to each volunteer, along with the route map and parent contact information for each participating family.
What can kids and families expect?
Outreach begins two weeks after the start of school. Strategies to promote the program include:
» Sending home materials with other school orientation materials » Reaching out to/through the PTAs
» Hosting a booth at back to school night
» Distributing newspaper/radio ads
» Creating an easy-to-use website where families can sign up online Parents need to sign a permission slip, emergency contact form, and liability waiver for their child to participate in the program. Once families are signed up, the route leader (who has passed a criminal background check and received training) calls the family to introduce themself. Parents get to know the route leader and they also know that if the bus gets canceled for any reason, or if there will be a substitute “driver,” they will receive a prompt call from the school coordinator.
Some routes, especially larger ones, are shared by several leaders.
Parents also receive an information packet containing the route map, their nearest stop, expectations for child behavior, protocol for if a child is late to a stop, what to do if their child will not attend on a given day, and alternate school schedule and inclement weather policy. They will also receive phone numbers for their route leader(s) and the school coordinator.
7.3 Other Education and Encouragement
Programs
In addition to the city’s SRTS Program, there are a variety of other programs the city should consider to educate and encourage bicycling.
The 2011 Bicycle Master Plan identified many of these education and encouragement programs. These programs have been reviewed and relevant programs have been compiled in Appendix B.
7.4 Other Evaluation Programs and
Policies
The city’s SRTS program includes evaluation techniques. In addition to the SRTS program, this section discusses other programs and policies that will help develop more bicycling opportunities in National City.
Chapter 7: Recommended Programs 103
Convene a Permanent Bicycle Advisory Committee
Target audience Citizen advocates
Primary agency City of National City
Potential partners Regional bicycling groups, such as San Diego County Bicycle Coalition (SDCBC) Purpose Advise City on bicycling issues
Timeframe Ongoing
Sample program Beaver Creek, OH: http://ci.beavercreek.oh.us/ boards-commissions/bikeway-advisory/
Many states, regional agencies, and cities have an official Bicycle Advisory Committee made of citizen volunteers, appointed by City Council or the appropriate body, to advise on bicycling issues. An advisory committee establishes the city’s commitment to making bicycling safer and more desirable and has the potential to assist the city in securing funding for bicycle-related projects. The Bicycle Advisory Committee (BAC) should be composed of representatives from all bicycle stakeholder groups.
The role of the BAC should include some or all of the following:
» Review and provide citizen input on capital project planning and design as it affects bicycling (e.g., corridor plans, street improvement projects, signing or signal projects, and parking facilities) » Review and comment on changes to zoning, development code, comprehensive or specific plans, and other long-term planning and policy documents
» Participate in the development, implementation, and evaluation of Bicycle Master Plans and bikeway facility standards
» Provide a formal liaison between local government, staff, and the public
» Develop and monitor goals and indices related to bicycling in the city
» Promote bicycling, including bicycle safety and education Because BAC members are volunteers, it is essential to have strong participation in order for the committee to be successful. An agency staff person should be formally assigned to the BAC and should take charge of managing the application process, managing agendas and minutes, scheduling meetings, bringing agency issues to the BAC, and reporting back to the agency and governing body about the BAC’s recommendations and findings.
Perform Annual Bicycle Counts
Target audience N/A
Primary agency City of National City
Potential partners Regional bicycling groups, local volunteers Purpose Track bicycling trends and measure success of the Bicycle Master Plan implementation
Timeframe Annually
Model program National Bicycle & Pedestrian Documentation Project: http://bikepeddocumentation.org/ Many jurisdictions do not perform regular bicycle counts. As a result, they do not have a mechanism for tracking bicycling trends over time or for evaluating the impacts of bicycle-related projects, policies, and programs. It is recommended that National City perform and/or coordinate annual counts of bicyclists (and ideally pedestrians as well) on both on- and off-street facilities according to national practices. The National Bicycle and Pedestrian Documentation Project has developed a recommended methodology, survey and count forms, and reporting forms. This approach may be modified to serve the needs and interests of individual jurisdictions. The city should manage tracking, analysis, and reporting. Counts can be done manually by staff/volunteers or using video or a variety of other technologies.
104 City of National City Bicycle Master Plan
Coordinate Roadway Safety Enforcement Actions
Target audience Motorists and bicyclists
Primary agency City of National City law enforcement
Potential partners Caltrans
Purpose Deter unsafe behaviors by motorists and bicyclists by enforcing traffic laws
Timeframe Ongoing
While enhancing roadway safety for active transportation users can largely be accomplished with a combination of targeted physical design elements and education efforts, it can be supplemented by enforcement actions such as motor vehicle speed enforcement, radar speed feedback sign deployment, bicycle light enforcement, and other actions. Speeding vehicles put bicyclists and pedestrians at risk and discourage non-motorized transportation. Targeted speed enforcement activities can address these issues. Law enforcement agencies can enforce speed limits on designated bikeways, near schools, and in response to resident reports. A radar speed feedback sign request program will deploy radar speed feedback trailer units at the request of neighborhood associations and schools. The trailer units can be deployed temporarily, supplemented by radar enforcement, and then moved to another location. The goal of these enforcement actions is not to issue a set number of citations or to instill feelings of fear in drivers; it is to encourage safe behavior and educate those operating motor vehicles about actions they can take to increase safety for active transportation users.
104 Page 1753 of 1838
Chapter 8
Costs and Funding
106 City of National City Bicycle Master Plan
8.1 Network Costs
Cost ranges for the recommended network’s
facility types, shown in Table 8-1, are based
on construction data from recently bid and
awarded bicycle and active transportation
projects in the San Diego region. While these
ranges were determined using recent costs,
inflationary pressures may cause them to be
inaccurate in the future and they should serve
only as rough estimates for future prioritiza-
tion rather than full or actual facility costs.
While Class II bicycle lanes and Class III bicy-
cle routes only require signage and striping,
recent best practices for these types of proj-
ects also include pavement reconstruction or
slurry seal of the pavement and more robust
Facility Facility Cost Ranges Per Mile ($/Mi)
Class I – Bicycle Path $1M to $2.5M
Class II – Bicycle Lane $750K to $2M
Class III – Bicycle Route $200K to $500K
Class III – Bicycle Boulevard $1.5M to $3M
Class IV – Cycle Track $2.5M to $5M
Source: WSP (2023)
Note: These estimated costs assume typical conditions found in the city and project areas, as well as recent construction costs in the San Diego region, at the time of this Bicycle Master Plan’s adoption rather than actual project costs. They serve as estimates for project prioritization. Table 8-1: Facility Unit Cost Ranges by Classification intersection treatments to provide additional
safety for bicycles and pedestrians.
Table 8-2 shows each ranked unfunded proj-
ect and the approximate cost score for each.
The approximate cost score is a high-level as-
sessment of the cost magnitude for a project.
It shows the general scale of cost for each proj-
ect relative to the others rather than specific
costs. The approximate cost score can thus be
used to compare potential project cost mag-
nitudes across the recommended unfunded
network and begin to assess which projects
may cost more than others for prioritization
purposes. These scores were determined us-
ing the facility cost ranges per mile shown in
Table 8-1 and should similarly not be used as
actual project cost estimates.
106 Page 1755 of 1838
Chapter 8: Costs and Funding 107
Table 8-2: Facility Priority and Approximate Cost Score by Segment Rank Project Name Street Bounds Facility Type Facility Length (Miles)
Approximate
Cost Score
1 18th Street Bicycle
Boulevard 18th Street Palm Avenue to Rachael Avenue Class IIIB 1 ◕ 2 8th Street Complete
Street Improvements
- 8th Street - Roosevelt Avenue to Paradise
Valley Road (Class III) Class II 0.47
◑
- Paradise Valley Road - 8th Street east to City
Boundary (Class II) Class IIIR 2.29
3 Highland Avenue Bike
Lanes Highland Avenue 30th Street to SR 54 exit ramp Class II 0.39 ◑ 4 F Avenue Bicycle
Boulevard
- F Avenue - 18th Street to 28th Street Class IIIB 1.31 ◕ - 26th Street - D Avenue to 18th Street 5 Las Palmas Bicycle
Corridor
- Roselawn Street - L Avenue to N Avenue
Class IIIR 1.15 ◔ - N Avenue - Roselawn Street to 22nd Street - 22nd Street - N Avenue to Palm Avenue
- Palm Avenue - 22nd Street to 8th Street
6 D Avenue Bicycle
Boulevard D Avenue Division Street to 18th Street Class IIIB 1.13 ◕ 7 Division Street Cycle
Track Division Street Lauren Avenue to Euclid Avenue Class IV 0.68 ● 8 30th Street Cycle
Track 30th Street Hoover Avenue to Highland Avenue Class IV 0.7 ● 9 16th Street Bicycle
Corridor 16th Street Highland Avenue to Harbison Avenue Class IIIR 1.46 ◑ 10 Granger Avenue
Bicycle Corridor
- Lanoitan Avenue - 16th Street to 24th Street
Class IIIR 1 ◔ - Granger Avenue - 18th Street to 24th Street - 24th Street - Euclid Avenue to Granger
Avenue
11 24th Street Complete
Street Improvements 24th Street
Hoover Avenue to Highland
Avenue (Class II) and Highland
Avenue to N Avenue (Class III
Bicycle Boulevard)
Class II 0.69
◑ Class IIIB 0.38
108 City of National City Bicycle Master Plan
TABLE 8-2: Facility Priority and Approximate Cost Score by Segment (Cont.) Rank Project Name Street Bounds Facility Type Facility Length (Miles)
Approximate
Cost Score
12 Hoover Avenue Cycle
Track Hoover Avenue 22nd Street to 33rd Street Class IV 0.76 ● 13 22nd Street Cycle
Track 22nd Street Wilson Avenue to D Avenue Class IV 0.57 ◕ 14 Harbison Avenue
Bicycle Corridor
- Harbison Avenue 4th Street to 16th Street, Earle
Drive Class IIIR 1.02 ◔ - Earle Drive
15 Olive Avenue Bike
Lanes Olive Avenue 8th Street to Plumas Street Class II 0.28 ◔ 16 D Avenue Bike Lanes D Avenue 30th Street to southern terminus Class II 0.23 ◔
17 Highland Avenue
Complete Street
Improvements
Highland Avenue
Delta Street to 2nd Street (Class
II) and 2nd Street to 4th Street
(Class III)
Class II 0.4
◑ Class IIIR 0.13
18 19th Street Cycle
Track 19th Street Kiss Street to McKinley Avenue Class IV 0.43 ◕ 19 B Avenue Bicycle
Boulevard/Advisory
Bicycle Lanes
B Avenue 1st Street to 4th Street Class IIIB 0.19 ◔
20 Bay Marina Drive Bike
Lanes Bay Marina Drive Tidelands Avenue to Marina Way Class II 0.25 ◔ 21 Roosevelt Avenue
North Bike Lanes Roosevelt Avenue 8th Street to 12th Street Class II 0.25 ◔ 22 16th Street Bike Lanes 16th Street Wilson Avenue to National City Boulevard Class II 0.31 ◔
23 Civic Center Drive
Cycle Track Civic Center Drive Tidelands Avenue to Wilson Avenue Class IV 0.26 ◑ 24 Roosevelt Avenue
South Bike Lanes Roosevelt Avenue Civic Center Drive to 16th Street Class II 0.19 ◔ 25 21st Street Bicycle
Corridor 21st Street F Avenue to L Avenue Class III 0.38 ◔ Source: WSP (2023)
Chapter 8: Costs and Funding 109
8.2 Funding Sources
There are a variety of potential funding sources, including local, state, regional, and federal funding programs as well as private sector funding that can be used to construct the recommended improvements.
Most of the federal, state, and regional programs are competitive and involve the completion of extensive applications with clear documentation of the project need, costs, and benefits. With regard to funding opportunities, the following should be noted:
» Funding sources are highly competitive with many agencies competing for the same “pots” of money » Funding is limited; capital funding needs far outweigh available funding each year
» Applying for funding is a time-consuming and staff-intensive process » Collaboration and partnerships with local agencies and community groups is key
Table 8-3 summarizes some available funding sources and identifies eligibility requirements for each. The following discussion is provided to assist National City staff in identifying appropriate sources of funding for the projects recommended in this plan.
8.3 Federally-Administered Funding
In 2021, the Infrastructure Investment and Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL), reauthorized the federal surface transportation grant programs. The BIL makes available a total of $1.2 trillion in infrastructure spending. Key programs funded by the BIL which include active transportation and/or bicycle components are Safe Streets and Roads for All (SSRA), Healthy Streets, Transportation Alternatives, Recreational Trails Program, Active Transportation Infrastructure Investment Program, Safe Routes to School, Carbon Mitigation and Air Quality Improvement Program (CMAQ), RAISE grants, Reconnecting Communities, Carbon Reduction Program, and the Surface Transportation Block Grant Program.
To be eligible for Federal transportation funds, states are required to develop a State Transportation Improvement Program (STIP) and update it at least every four years. A STIP is a multi-year capital improvement program of transportation projects; it serves to coordinate transportation-related capital improvements of MPOs such as SANDAG.
In California, the STIP includes projects on and off the State Highway System and is funded with revenues from the Transportation Investment Fund and other funding sources. The California STIP is typically updated every two years. To be included in the STIP, projects must be included in the Interregional Transportation Improvement Plan (ITIP) prepared by Caltrans or the Regional Transportation Improvement Plans (RTIPs) prepared by MPOs and regional agencies. Bicycle and pedestrian projects are eligible for inclusion.
8.4 State-Administered Funding
The State of California uses both federal sources and its own budget to fund the following bicycle and pedestrian projects and programs.
Road Repair and Accountability Act (SB1)
In 2017, the California State Legislature voted to approve the Road Repair and Accountability Act (SB1). SB1 raised motor vehicle fuel taxes $0.12 for gasoline and $0.20 for diesel fuels. Additionally, to address the lack of revenue from zero-emissions vehicles, a $100.00 registration fee is applied to alternatively fueled vehicles, which the Department of Motor Vehicles began collecting on July 1, 2020. The fuel tax increase is anticipated to raise an additional $54 billion over the next decade, which will provide much needed funds for roadway maintenance and repairs, transit, and active transportation facilities statewide. The bill directs the California Transportation Commission
110 City of National City Bicycle Master Plan
(CTC) to oversee the administration of these funds and make recommendations on appropriations granted each year from the California State Legislature.
Active Transportation Program
Every two years, the CTC releases a Notice of Funding Availability for the ATP. These funds are used for the implementation of active transportation projects across the state. The last cycle (cycle 6) issued a call for projects in March 2022, and $650,000,000 was available to project sponsors for implementation, planning, and non-infrastructure projects. The amount of funding fluctuates every round depending on appropriations from the California State Legislature. 50% of that funding is competitive, with 40% of the ATP funding going to MPOs such as SANDAG to fund local projects at the MPO’s discretion. Disadvantaged communities are guaranteed at least 25% of the program’s funds.
These funds are used to further California’s commitment to reduce automobile trips and increasing the safety of non-motorized users of the State’s transportation system.
Local Partnership Program
The Local Partnership Program (LPP) is another SB1 grant program.
The program continuously appropriates $200,000,000 annually to provide local assistance to entities which tax themselves for transportation improvements and services. The Notice of Funding Availability for this program comes out every two years. 40% of these funds is part of the competitive program, while 60% is part of the formulaic program, appropriating funds to local governments based on proportional revenue from local jurisdictions. The program aims to provide infrastructure improvements either through maintenance or adding capacity to the transportation system across all modes.
Caltrans Sustainable Transportation Planning Grants
Caltrans operates a grant program independent of CTC to fund transportation planning projects statewide. A total of $84 million is expected to be available (according to the draft application guide submitted for public comment in October 2022) during the FY 2023-2024 grant cycle, of which $29.5 million will be made available for sustainable communities grants, $4.5 million will be made available for strategic partnerships with Caltrans, and $50 million will be made available for a one-time climate adaptation planning grant pool. Funding availability is contingent upon appropriations by the California State Legislature.
These grants are available annually and are typically less than $1 million each.
Other Grant Opportunities
The State of California is a national leader in sustainability and is committed to reducing the harmful effects of greenhouse gases, congestion, and poor public health. Agencies across California often release funding opportunities for smaller grant opportunities or start-up programs. Keeping track of these potential opportunities will be necessary to successfully fund infrastructure programs.
8.5 Regional Agency-Administered
Funding
TransNet
SANDAG imposes a half-cent sales tax to all San Diego County residents and non-residents completing transactions in the County. These funds go directly to local governments to fund transportation improvements. The sales tax is a component of a larger transportation plan in San Diego County to reduce congestion and improve air quality.
There are several grant programs which TransNet funds at the county-wide level, one of which is specifically aimed at funding active transportation projects.
Chapter 8: Costs and Funding 111
Active Transportation Grant Program
TransNet funds this grant program for both capital and planning active transportation projects. To implement TransNet’s active transportation priorities, this grant program provides funding for local jurisdictions to provide accessibility for pedestrians and cyclists, as well as bicycle parking, educational programs, encouragement, and awareness programs. These funds are available for any jurisdiction within SANDAG’s jurisdiction, and typically amount to less than $1 million each for capital infrastructure.
8.6 Local Agency-Administered and
Non-Traditional Funding Sources
SANDAG Transportation Funding
MPOs typically administer local funding to municipalities and other local governments to help fund transportation improvements. SANDAG serves as the region’s MPO and has their own dedicated transportation funding source which is available to National City.
Enhanced Infrastructure Financing District
The California Department of Finance (DOF) allows for local municipalities to collect taxes to fund specific infrastructure improvements in a concentrated part of a municipality. Established by SB 628, this addition to the California Government Code allows cities to implement concentrated tax mechanisms to fund local infrastructure priorities.
The geographic bounds of this tool are not specified, but it could cover a street or neighborhood and could cross jurisdictional boundaries to allow for priorities which may require collaboration with other governments. This collaboration can be established at any time, without any public vote.
Volunteer and Public-Private Partnerships
Local schools or community groups can maintain bikeways as projects for the year, possibly working with a local designer or engineer. A challenge grant program with local businesses may be a source of local funding where corporations ‘adopt’ a bikeway and help construct and maintain the facility.
112 City of National City Bicycle Master Plan
Grant Source Frequency Administering
Agency
Average
Annual
Total
Matching
Requirement
Eligible
Applicants Eligible Phase Comments
State Administered Funding
Active
Transportation
Program
Every two
years
California
Transportation
Commission
~$400
million N/A
Government
agencies and
nonprofits
Capital, Planning
ATP funds come around
every 2 years, and
typically fund only
active transportation
improvements. 25% of
these funds are reserved for
disadvantaged communities.
Local
Partnership
Program
Every two
years
California
Transportation
Commission
~$200
million 100% Government agencies
Capital only
(except for DB)
This program funds
all transportation
improvements, so active
transportation is likely to be
a smaller component.
Sustainable
Transportation
Planning Grant
Annual Caltrans ~$34 million
11.47% for
Sustainable
Communities,
Climate
Adaptation
Planning,
Strategic
Partnerships
- Transit; 20%
for Strategic
Partnerships
Government
agencies Planning
This program is split into
two components, one
where Caltrans is involved
in implementing state
priorities and one where
only local priorities are
provided funding. The latter
has a larger portion of
funding available.
Locally Administered Funding
Active
Transportation
Grant Program
Annual SANDAG ~$3-5
million N/A SANDAG
municipalities
Capital and
Planning
This program is available
every few years to all
agencies in the SANDAG
region.
Table 8-3: Potential Funding Sources
Appendices
Page intentionally left blank
Appendix A: Detailed Project Prioritization
A
A robust scoring method was used to prioritize all recommended unfunded bicycle projects to provide National City with a roadmap for planning which facilities to fund and construct first. Due to funding and implementation constraints, facilities are constructed on a rolling basis. It is therefore important to prioritize the list of bicycle project recommendations.
The prioritization method took into account key factors that are important to National City in the implementation of bicycle facilities. Similarly, this method recognized that not all factors are of equal importance to the city and adjusted the weighting of these factors accordingly. The detailed project priority scores and adjustment factors are shown in the following pages.
A-1
Recommended Unfunded Bicycle Projects Prioritization
Project Name Street Bounds Facility Type Facility Length (Miles)
Previously
Identified
4: Previously identified
3: Previously identified
but amended
2: Not previously
identified
Placemaking
4: Will directly connect to both
park and school or 3+ schools
3: Will directly connect to park
or school
2: Will indirectly connect to
park or school
1: Will not connect to park or
school
Safety Need
4: High number of
collisions
3: Moderate number of
collisions
2: Low number of
collisions
1: No collisions
Bicycle Propensity
4: Adjacent to area with high
number of modeled bike trips
3: Adjacent to area with
moderate number of modeled
bike trips
2: Adjacent to area with low
number of modeled bike trips
1: Adjacent to area with very low
modeled bike trips
Engineering Feasibility
4: 0 complications
3: 1 complications
2: 2 or 3 complications
1: ROW or Environmental
Complications:
- Parking
- Intersection Operations
- Interagency Coordination
(Caltrans/MTS/CPUC)
Regional Connectivity
4: Direct connection to existing
regional facility
3: Direct connection to planned
regional facility
2: Relative connection to regional
facility due to proximity
1: No connection to regional
facility
Composite
Score
Rank
18th Street Bicycle Boulevard 18th Street Palm Avenue to Rachael Avenue Class III Bicycle Boulevard 1.00 4 4 4 3 3 4 3.66 1 8th Street Complete Street
Improvements
- 8th Street
- Paradise Valley Road
- Roosevelt Avenue to Paradise Valley
Road (Class III)
- 8th Street east to City Boundary (Class
II)
Class II
Class III Bicycle Route
0.47 Class II
2.29 Class III 3 4 4 4 3 3 3.55 2
Highland Avenue Bike Lanes Highland Avenue 30th Street to SR 54 exit ramp Class II 0.39 4 3 4 4 2 4 3.49 3 F Avenue Bicycle Boulevard
- F Avenue
- 26th Street
- 18th Street to 28th Street
- D Avenue to 18th Street Class III Bicycle Boulevard 1.31 4 4 4 4 3 1 3.37 4 Las Palmas Bicycle Corridor
- Roselawn Street
- N Avenue
- 22nd Street
- Palm Avenue
- L Avenue to N Avenue
- Roselawn Street to 22nd Street
- N Avenue to Palm Avenue
- 22nd Street to 8th Street Class III Bicycle Route 1.15 3 3 3 3 4 2 3.02 5 D Avenue Bicycle Boulevard D Avenue Division Street to 18th Street Class III Bicycle Boulevard 1.13 2 4 4 2 2 3 2.92 6 Division Street Cycle Track Division Street Laurel Avenue to Euclid Avenue Class IV 0.68 4 3 1 4 2 4 2.86 7 30th Street Cycle Track 30th Street Hoover Avenue to Highland Avenue Class IV 0.70 2 4 2 4 3 2 2.85 8 16th Street Bicycle Corridor 16th Street Highland Avenue to Harbison Avenue Class III Bicycle Route 1.46 4 3 2 2 4 2 2.76 9 Granger Avenue Bicycle Corridor
- Lanoitan Avenue
- Granger Avenue
- 24th Street
- 16th Street to 24th Street
- 18th Street to 24th Street
- Euclid Avenue to Granger Avenue Class III Bicycle Route 1.13 4 3 2 1 4 3 2.75 10 24th Street Complete Street
Improvements 24th Street
Hoover Avenue to Highland Avenue
(Class II) and Highland Avenue to N
Avenue (Class III Bicycle Boulevard)
Class II
Class III Bicycle Boulevard
0.69 Class II
0.38 Bicycle
Boulevard 3 2 4 3 2 2 2.72 11
Hoover Avenue Cycle Track Hoover Avenue 22nd Street to 33rd Street Class IV 0.76 4 2 1 3 2 4 2.52 12 22nd Street Cycle Track 22nd Street Wilson Avenue to D Avenue Class IV 0.57 4 3 3 2 2 1 2.48 13 Harbison Avenue Bicycle Corridor
- Harbison Avenue
- Earle Drive 4th Street to 16th Street, Earle Drive Class III Bicycle Route 1.02 4 2 1 2 4 2 2.38 14 Olive Avenue Bike Lanes Olive Avenue 8th Street to Plumas Street Class II 0.28 4 3 1 2 2 3 2.36 15 D Avenue Bike Lanes D Avenue 30th Street to southern terminus Class II 0.23 2 1 2 4 3 2 2.34 16 Highland Avenue Complete Street
Improvements Highland Avenue
Delta Street to 2nd Street (Class II) and
2nd Street to 4th Street (Class III)
Class II
Class III Bicycle Route
0.40 Class II
0.13 Class III 3 1 3 2 2 3 2.32 17
19th Street Cycle Track 19th Street Kidd Street to McKinley Avenue Class IV 0.43 2 1 2 3 2 4 2.31 18 B Avenue Bicycle Boulevard/Advisory
Bicycle Lanes B Avenue 1st Street to 4th Street Class III Bicycle Boulevard 0.19 4 1 2 1 4 2 2.25 19 Bay Marina Drive Bike Lanes Bay Marina Drive Tidelands Avenue to Marina Way Class II 0.25 4 1 2 2 2 3 2.24 20 Roosevelt Avenue North Bike Lanes Roosevelt Avenue 8th Street to 12th Street Class II 0.25 4 3 1 3 2 1 2.23 21 16th Street Bike Lanes 16th Street Wilson Avenue to National City Boulevard Class II 0.31 4 3 1 1 3 2 2.21 22 Civic Center Drive Cycle Track Civic Center Drive Tidelands Avenue to Wilson Avenue Class IV 0.26 3 1 4 1 1 3 2.19 23 Roosevelt Avenue South Bike Lanes Roosevelt Avenue Civic Center Drive to 16th Street Class II 0.19 2 2 1 1 3 1 1.64 24 21st Street Bicycle Corridor 21st Street F Avenue to L Avenue Class III Bicycle Route 0.38 2 1 1 2 3 1 1.64 25 A-2
Project Priority Score Adjustment Factors
Criteria Weight
Previously Identified 0.75
Placemaking 1.00
Safety Need 1.25
Bicycle Propensity 1.00
Engineering Feasibility 1.00
Regional Connectivity 0.90
A-3
Appendix B: Bicycle Facility Design Guidelines
B
BICYCLE MASTER PLAN | 93
6.5.1 Shared Roadways
Shared Roadways Guidelines
Design Summary
Shared roadway recommended configuration.
This bike route in the City of Los Angeles provides a wide outside lane adjacent to on-street parking.
D11-1 “Bike Route” sign should be used along designated shared roadways.
Use D11-1 Bike Route Sign at:
Beginning or end of Bicycle Route (with applicable
M4 series sign below)
Entrance to bicycle path (Class I) – optional
At major changes in direction or at intersections
with other bicycle routes (with applicable M7 series
sign below)
At intervals along bicycle routes not to exceed ½
mile (0.8 km)
Discussion
Class III bicycle facilities (Caltrans designation) are defined as facilities shared with motor vehicles, identified
exclusively by signage and/or shared lane markings. They are typically used on roads with low speeds and traffic volumes; however, they can be used on higher volume
roads with wide outside lanes or shoulders. Shared
roadways often have a centerline stripe only and no
designated shoulders. Shared lane markings in addition to signage may be more appropriate for roadways with
narrow travel lanes and parking.
Shared roadways provide key connections to destinations and trails where providing additional separation is not possible.
Guidance
From Caltrans Highway Design Manual (HDM)
Chapter 1000:
“Class III bikeways (bike routes) are intended to
provide continuity to the bikeway system. Bike
routes are established along through routes not
served by Class I or II bikeways, or to connect
discontinuous segments of bikeway (normally bike
lanes). Class III facilities are shared facilities,
either with motor vehicles on the street, or with
pedestrians on sidewalks, and in either case bicycle
usage is secondary. Class III facilities are
established by placing Bike Route signs along
roadways.”
AASHTO Guide for the Development of Bicycle
Facilities
California MUTCD, Part 9
B-1
BICYCLE MASTER PLAN | 95
Bicycle Lanes Guidelines
Design Summary
Approved R-81 Sign.
Approved California
Bicycle lane stencils (either is
optional, as is arrow).
Width varies depending on roadway configuration; see following pages for design examples. Five to eight feet is standard, measured from edge of gutter pan. Striping:
Separating vehicle lane from bicycle lane (typically left sideline): 6 inches. Separating bicycle lane from parking lane (if applicable): 4 inches. Dashed white stripe when:
o Vehicle merging area (optional): Varies
o Approach to intersections: 100-200 feet
o Delineate conflict area at intersections (optional): Length of conflict area Signing: use R-81 Bicycle Lane Sign at:
Beginning of bicycle lane
Far side of all bicycle path (Class I) crossings
At approaches and at far side of all arterial crossings At major changes in direction
At intervals not to exceed ½ mile
Pavement markings: the preferred pavement marking for bicycle lanes is the bicycle lane stencil with directional arrow to be used at:
Beginning of bicycle lane
Far side of all bicycle path (Class I) crossings
At approaches and at far side of all arterial crossings At major changes in direction
At intervals not to exceed ½ mile
At beginning and end of bicycle lane pockets at approach to intersection Discussion
Bicycle lanes or Class II bicycle facilities (Caltrans designation) are defined as a portion of the roadway that has been designated by striping, signage, and pavement markings for the preferential or exclusive use of bicyclists. Bicycle lanes are generally found on major arterial and collector roadways and are 5-8 feet wide. Bicycle lanes can be found in a large variety of configurations and can have special characteristics including coloring and placement if beneficial.
Bicycle lanes enable bicyclists to ride at their preferred speed without interference from prevailing traffic conditions and facilitate predictable behavior and movements between bicyclists and motorists. Bicyclists may leave the bicycle lane to pass other bicyclists, make left turns, avoid obstacles or debris, and to avoid conflicts with other roadway users.
Additional Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD
Additional standards and treatments for bicycle lanes are provided in the following pages B-2
96 | CITY OF NATIONAL CITY
Bicycle Lane Adjacent to On-Street Parallel Parking
Design Summary
Parking ‘T’ bicycle lane design.
Diagonal stripe bicycle lane design (maximum width).
Parking buffer bicycle lane design.
Bicycle Lane Width:
5’ recommended when parking stalls are marked
4’ minimum in constrained locations
8’ maximum (greater widths may encourage vehicle
loading in bicycle lane)
Shared bicycle and parking lane width:
12’ for a shared lane adjacent to a curb face
11’ minimum for a shared bicycle/parking lane where
parking is permitted but not marked on streets without
curbs
If the parking volume is substantial or turnover is high, an additional 1 to 2 feet of width is desirable
Discussion
Bicycle lanes adjacent to on-street parallel parking are common in the U.S. A suddenly-opened vehicle door presents a hazard for bicyclists using this type of facility, especially when adequate separation from parked vehicles is not provided. Conversely, wide bicycle lanes may encourage the bicyclist to ride farther to the right (door zone) to maximize distance from passing traffic. Wide bicycle lanes may also cause confusion with unloading vehicles in busy areas where parking is typically full.
Treatments to encourage bicyclists to ride away from the ‘door zone’ include:
Installing parking “T’s” and smaller bicycle lane stencils placed to the left (see graphic at top)
Using diagonal stripes to encourage bicyclists to ride on the left side of the bicycle lane (shown middle; this
treatment is not standard and should be studied before
use)
Provide a buffer zone (preferred design; shown bottom).
Bicyclists traveling in the center of the bicycle lane will be less likely to encounter open car doors. Motorists have space to stand outside the bicycle lane when loading and unloading.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD
B-3
Bicycle Lane Adjacent to On-Street Diagonal Parking
Design Summary
Bicycle Lane Width:
5’ minimum
White 4” stripe separates bicycle lane from parking bays Parking bays are sufficiently long to accommodate most vehicles (vehicles do not block bicycle lane)
Recommended bicycle lane adjacent to
on-street diagonal parking design.
‘Back-in’ diagonal parking enhances safety
for bicyclists by improving drivers’ visibility
as they exit the parking space.
Discussion
In areas with high parking demand such as urban commercial areas, diagonal parking can be used to increase parking supply. Conventional “head-in” diagonal parking is not recommended in conjunction with high levels of bicycle traffic or with the provision of bicycle lanes as drivers backing out of conventional diagonal parking spaces have poor visibility of approaching bicyclists.
The use of ‘back-in diagonal parking’ or ‘reverse angled parking’ is recommended over head-in diagonal parking. This design addresses issues with diagonal parking and bicycle travel by improving sight distance between drivers and bicyclists and has other benefits to vehicles including: loading and unloading of the trunk occurs at the curb rather than in the street, passengers (including children) are directed by open doors towards the curb, no door conflict with bicyclists. While there may be a learning curve for some drivers, using back-in diagonal parking is typically an easier maneuver than conventional parallel parking.
Guidance
AASHTO Guide for the Development of Bicycle Facilities B-4
98 | CITY OF NATIONAL CITY
Bicycle Lane without On-Street Parking
Design Summary
Bicycle lane width:
4’ minimum when no curb & gutter are present
(rural road sections)
5’ minimum when adjacent to curb and gutter (3’
more than the gutter pan width if the gutter pan
is wider than 2’)
6’ recommended where ROW allows
Maximum Width:
8’ adjacent to arterials with high travel speeds (45+ mph)
Recommend bicycle lane without on-street parking design.
Where on-street parking is not allowed adjacent to a
bicycle lane, bicyclists do not require additional space to avoid opened car doors.
Discussion
Wider bicycle lanes are desirable in certain
circumstances such as on higher speed arterials (45+
mph) where a wider bicycle lane can increase
separation between passing vehicles and bicyclists.
Wide bicycle lanes are also appropriate in areas with
high bicycle use. A bicycle lane width of six to eight
feet makes it possible for bicyclists to ride side-by-side or pass each other without leaving the bicycle lane,
increasing the capacity of the lane. Appropriate
signing and stenciling is important with wide bicycle
lanes to ensure motorists do not mistake the lane for a vehicle lane or parking lane.
Guidance
AASHTO Guide for the Development of Bicycle
Facilities
Caltrans Highway Design Manual (Chapter 1000)
California MUTCD
B-5
Bicycle Lane Intersection Treatments
Bicycle Signal Actuation
Design Summary
Recommended loop detector marking design.
Example bicycle actuator marking.
Instructional Sign
(MUTCD Sign R10-15).
At signalized intersections, bicyclists should be able to trigger signals when cars are not present. Requiring bicyclists to dismount to press a pedestrian button is inconvenient and requires the bicyclist to merge into traffic at an intersection. It is particularly important to provide bicycle actuation in a left-turn only lane where bicyclists regularly make left turn movements.
Discussion
Loop Detectors
Bicycle-activated loop detectors are installed within the roadway to allow the presence of a bicycle to trigger a change in the traffic signal.
This allows the bicyclist to stay within the lane of travel and avoid maneuvering to the side of the road to trigger a push button.
Many demand-actuated signals use loop detectors embedded in the roadway pavement, which can be attuned to be sensitive enough to detect any type of metal, including bicycle frames. Identify with the “Bicycle Detector Symbol” shown in Figure 9C-7(CA) in the CAMUTCD.
Detection Cameras
Video detection cameras can also be used to determine when a vehicle is waiting for a signal. These systems use digital image processing to detect a change in the image at the location. Cameras can detect bicycles, although bicyclists should wait in the center of the lane, where an automobile would usually wait, in order to be detected.
Detection cameras are currently used for bicyclists in the City of San Luis Obispo, CA, where the system has proven to detect pedestrians as well.
Remote Traffic Microwave Sensor Detection (RTMS)
RTMS is a system developed in China which uses frequency modulated continuous wave radio signals to detect objects in the roadway. This method is marked with a time code which gives information on how far away the object is. The RTMS system is unaffected by temperature and lighting, which can affect standard detection cameras.
Guidance
ITE Guidance for Signal Detection for Bicycles:
https://www.ite.org/technical-resources/topics/completestreets/bicycle-signals/signal-detection-for-bicycles/ B-6
Bicycle Lane Intersection Treatments
Bicycle Lanes at Channelized Intersection with Right Turn Pocket Design Summary
Recommended shared bicycle/right turn lane design.
Shared bicycle-right turn lanes require warning signage as well as pavement markings.
Shared turn lane width – min. 12 feet
Bicycle lane pocket width – min. 4 feet
Discussion
This treatment is recommended at intersections lacking
sufficient space to accommodate a standard bicycle lane and right turn lane. The shared bicycle/right turn lane places a standard-width bicycle lane on the left side of a dedicated right turn lane. A dashed stripe delineates the space for bicyclists and motorists within the shared lane. This
treatment includes signage advising motorists and
bicyclists of proper positing within the lane.
According to the CA MUTCD and Chapter 1000 of the
Caltrans HDM, the appropriate treatment for right-turn
only lanes is to place a bicycle lane pocket between the right-turn lane and the right-most through lane or, where ROW is insufficient, to drop the bicycle lane entirely
approaching the right-turn lane. Dropping the bicycle lane is not recommended, and should only be done when a bicycle lane pocket cannot be accommodated.
Colored bicycle lanes can help distinguish the bicycle lane in the merging area (see colored bicycle lane guidelines).
Advantages:
Aids in correct positioning of bicyclists at
intersections with a dedicated right-turn lane
without adequate space for a dedicated bicycle lane
Encourages motorists to yield to bicyclists when
using the right turn lane
Reduces motor vehicle speed within the right-turn
lane
Disadvantages:
May not be appropriate for intersections with large
percentages of right-turning heavy vehicles
Guidance
This treatment has been implemented in San
Francisco, CA and Eugene, OR
AASHTO Guide for the Development of Bicycle
Facilities
Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-7
104 | CITY OF NATIONAL CITY
Retrofitting Existing Streets with Bicycle Lanes
Roadway Widening
Design Summary
Roadway widening is preferred on roads
lacking curbs, gutters, and sidewalks
Bicycle Lane Width:
4 feet minimum (see bicycle lane guidance)
5 – 6 feet preferred
Discussion
Bicycle lanes may be accommodated on streets with excess ROW through shoulder widening. Although street widening incurs higher expenses when compared to re-striping projects, bicycle lanes can be added to streets currently lacking curbs, gutters, and sidewalks without major infrastructure
reconstruction.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
Rosales, Jennifer. (2006). Road Diet Handbook: Setting Trends for Livable Streets Example of roadway widening to accommodate bicycle lanes and sidewalks.
B-8
BICYCLE MASTER PLAN | 105
Retrofitting Existing Streets with Bicycle Lanes
Lane Narrowing (Road Diet 1)
Design Summary
This street in Portland, Oregon previously had 13’
lanes which were narrowed to accommodate bicycle
lanes without removing travel lanes.
Vehicle lane: before 12’ to 15’; after: 10’ to 11’
Bicycle lane width: see bicycle lane design guidance
Discussion
Also called a "Road Diet," lane narrowing utilizes roadway space that exceeds minimum standards to create the required width to provide bicycle lanes. Many roadways have lanes that are wider than currently established minimums
contained in the AASHTO Policy on the Geometric Design of Highways and Streets and the Caltrans HDM. Most standards allow for the use of 11’ and sometimes 10’ travel lanes.
Special considerations should be given to the amount of heavy vehicle traffic and horizontal curvature before the decision is made to narrow travel lanes. Center turn lanes can also be narrowed in some situations to create pavement
space for bicycle lanes.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
Rosales, Jennifer. (2006). Road Diet Handbook: Setting Trends for Livable Streets Example of vehicle travel lane narrowing to accommodate bicycle lanes.
B-9
106 | CITY OF NATIONAL CITY
Retrofitting Existing Streets with Bicycle Lanes
Lane Reconfiguration (Road Diet 2)
Design Summary Design Example
Vehicle lane width depends on project. Lane
narrowing may not be needed if a lane is removed
Bicycle lane width: see bicycle lane design guidance
This road was re-striped to convert four vehicle
travel lanes into three travel lanes with bicycle lanes.
Discussion
The removal of a single travel lane will generally provide sufficient space for bicycle lanes on both sides of a street.
Streets with excess vehicle capacity provide opportunities for bicycle lane retrofit projects. Depending on a street’s existing configuration, traffic operations, and user needs, various lane reduction configurations may be applied. For instance, a four-lane street (with two travel lanes in each direction) could be modified to include one travel lane in each direction, a center turn lane, and bicycle lanes. Prior to implementing this measure, a traffic analysis should be performed to identify potential impacts.
Guidance
Slated for inclusion in the update to the AASHTO Guide for the Development of Bicycle Facilities Rosales, Jennifer. (2006). Road Diet Handbook: Setting Trends for Livable Streets Example of vehicle travel lane reconfiguration to accommodate bicycle lanes B-10
Retrofitting Existing Streets with Bicycle Lanes
Parking Reduction (Road Diet 3)
Design Summary
Some streets may not require parking on both
sides
Vehicle lane width depends on project. Lane narrowing may not be needed depending on the width of the
parking lane to be removed
Bicycle lane width: see bicycle lane design guidance
Discussion
Bicycle lanes could replace one or more on-street parking lanes on streets where excess parking exists and/or the importance of bicycle lanes outweighs parking demand. For instance, parking may be needed on only one side of a street (as shown below and at right). Eliminating or reducing on-street parking also improves sight distance for bicyclists in bicycle lanes and for motorists on approaching side streets and driveways. Prior to reallocating on-street parking for other uses, a parking study should be performed to gauge demand and to evaluate impacts to people with disabilities.
Guidance
Rosales, Jennifer. (2006). Road Diet Handbook: Setting Trends for Livable Streets Example of parking removal to accommodate bicycle lanes.
B-11
108 | CITY OF NATIONAL CITY
6.5.4 Bicycle Routes/Bicycle Boulevards
Bicycle Routes/Boulevards
Design Summary
Recommended design for bicycle boulevards.
Bicycle boulevards are designed for low-speed/
volume streets to provide a comfortable and
pleasant experience for bicyclists.
Roadway width varies depending on roadway configuration Use D11-1 “Bike Route” signs as specified for shared
roadways
Shared lane markings may be applied
Intersection treatments, traffic calming, and traffic diversions can be applied to improve the bicycling
environment, as discussed in the following pages
Discussion
Bicycle boulevards are low-volume streets where motorists and bicyclists share the same space. Treatments for bicycle boulevards include five “application levels” based on their level of physical intensity, with Level 1 representing the least physically-intensive treatments that can be implemented at relatively low costs.
Traffic calming and other treatments are applied along the corridor to reduce vehicle speeds such that motorists and bicyclists travel at similar speeds, creating a more comfortable environment for all users. Bicycle boulevards incorporate treatments to facilitate convenient crossings where the route crosses a major street. They work best in well-connected street grids where riders can follow reasonably direct and logical routes and when higher-order parallel streets exist to serve through vehicle traffic.
Bicycle boulevards can be enhanced with shared lane markings, directional signage, traffic diverters, chicanes, chokers, and other traffic calming measures to reduce vehicle speeds and/or volumes.
The level of treatment provided at a specific location depends on several factors, discussed in the following pages.
Guidance
Bicycle boulevards have been implemented in Berkeley, Emeryville, Palo Alto, San Luis Obispo, and Pasadena, CA; Portland and Eugene, OR; Vancouver, BC; Tucson, AZ;
Minneapolis, MN; Ocean City, MD; and Syracuse, NY
Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design Tools and Guidelines:
https://nacto.org/wp-content/uploads/2012/06/City-ofBerkeley-2000.pdf AASHTO Guide for the Development of Bicycle Facilities California MUTCD
B-12
Bicycle Routes/Boulevards
Discussion (continued)
Bicycle boulevards serve a variety of purposes:
Parallel major streets lacking dedicated bicycle
facilities:
o Higher-order streets typically include major
bicyclist destinations (e.g., commercial and
employment areas). However, these corridors
often lack bicycle lanes or other dedicated
facilities, creating an uncomfortable, unattractive,
and potentially challenging riding environment.
Bicycle boulevards serve as alternate parallel
facilities that allow bicyclists to avoid major
streets for longer trips.
Parallel major streets with bicycle facilities that are uncomfortable for some users:
o Some users may not feel comfortable using
bicycle lanes on major streets due to high traffic
volumes and vehicle speeds, conflicts with
motorists entering and leaving driveways, and/or
conflicts with buses loading and unloading
passengers. Children and less-experienced riders
may find these environments especially
challenging. Utilizing lower-order streets, bicycle
boulevards provide alternate route choices for
these types of bicyclists. It should be noted that
bicycle lanes on major streets provide important
access to key land uses, and the major street
network often provides the most direct routes
between major destinations. For these reasons,
bicycle boulevards should complement a bicycle
lane network and not serve as a substitute.
Ease of implementation on most local streets:
o Bicycle boulevards incorporate cost-effective and
less physically-intrusive treatments than bicycle
lanes and cycle tracks. Relatively inexpensive
treatments such as new signage, pavement
markings, and striping can be applied to enhance
bicyclists’ mobility and safety. Other treatments
such as curb extensions, medians, and signal
modifications can be implemented at reasonable
costs, with consideration for emergency vehicle
access.
Benefits beyond an improved bicycling
environment:
o Residents living on bicycle boulevards benefit
from reduced vehicle speeds and through traffic.
Pedestrians and other users can also benefit from
bicycle boulevards through improved crossings at
intersections.
Sample bicycle boulevard treatments.
B-13
11 0 | CITY OF NATIONAL C I TY
Bicycle Routes/Boulevards
Bicycle Boulevard Application Levels
This section describes various treatments commonly used for developing Bicycle Boulevards. The treatments fall within fve basic “application levels” based on their level of physical intensity, with Level 1 representing the least physicallyintensive treatments that could be implemented at relatively low costs and constitute Bicycle Routes. Identifying appropriate application levels for individual Bicycle Boulevard corridors provides a starting point for selecting appropriate site-specific improvements. The five Bicycle Boulevard application levels are as follows:
Level 1: Signage
Level 2: Pavement Markings
Level 3: Intersection Treatments
Level 4: Tra
c Calming
Level 5: Tra
c Diversion
It should be noted that corridors targeted for higher-level applications would also receive relevant lower-level treatments since a Bicycle Boulevard is a Bicycle Route where additional traffic calming measures have been implemented. For instance, a street targeted for Level 3 applications should also include Level 1 and 2 applications as necessary. Additionally, it may not be necessary to apply all treatments for a specific level. National City should gather input from the bicycling community and neighborhood groups during the planning stages.
POTENTIAL BICYCLE BOULEVARD APPLICATIONS
LEVEL 1
Signage
LEVEL 2
Pavement Markings
LEVEL 3
Intersection
Treatments
LEVEL 4
Traffic Calming
LEVEL 5
Traffic Diversion
Intensity of Treatments
(varies based on roadway conditions and area characteristics) Shared Lane
Marking
Shared Lane
Marking
Shared Lane
Marking
Shared Lane
Marking
Pavement
Markings
Pavement
Markings
Pavement
Markings
Pavement
Markings
Medians/
Islands Half Signals
Medians/
Islands Half Signals
Medians/
Islands Half Signals
Chicanes
Mini Traffic
Circles Chicanes
Mini Traffic
Circles
Choker
Entrances
Traffic
Diverters
Signed Shared Bikeway Bicycle Boulevard
Bicycle LeftTurn LanesMarked
Crosswalks
Wayfinding Warning Wayfinding Warning Wayfinding Warning Wayfinding Warning Wayfinding Warning B-14
Level 1: Bicycle Route/Boulevard Signing
Design Summary
Signage is a cost-effective, yet highly-visible treatment that can improve the riding environment on a bicycle
boulevard
Consistent signage and pavement markings should be
applied
Discussion
Wayfinding Signs
Wayfinding signs are typically placed at key locations leading to and along bicycle boulevards, including where multiple routes intersect and at key bicyclist “decision points.” Wayfinding signs displaying destinations, distances, and “riding time” can dispel common misperceptions about time and distance while
increasing users’ comfort and accessibility to the boulevard network.
Wayfinding signs also visually cue motorists that they are driving along a bicycle route and should correspondingly use caution. Note that too many signs tend to clutter the ROW and it is recommended that these signs be posted at a level most visible to bicyclists and pedestrians, rather than per vehicle signage standards.
Warning signs
Warning signs advising motorists to “share the road” and “watch for bicyclists” may also improve bicycling conditions on shared streets. These signs are especially useful near major bicycle trip generators such as schools, parks and other activity centers.
Warning signs should also be placed on major streets
approaching bicycle boulevards to alert motorists of bicyclist crossings.
Guidance
Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design Tools and Guidelines
AASHTO Guide for the Development of Bicycle Facilities California MUTCD, Part 9
B-15
112 | CITY OF NATIONAL CITY
Level 2: Bicycle Route/Boulevard Pavement Markings
Design Summary
Bicycle boulevard directional
marker.
Shared lane markings also provide
directional support for bicyclists.
Example of on-street parking
delineation.
The shared lane marking is the only wayfinding/bicycle boulevard pavement marking approved by the California MUTCD
Discussion
Directional Pavement Markings
Directional pavement markings (also known as “bicycle boulevard markings” or “breadcrumbs”) lead bicyclists along a boulevard and reinforce that they are on a designated route. Markings can take a variety of forms, such as small bicycle symbols placed every 600-800 feet along a linear corridor, as previously used on Portland, Oregon’s bicycle boulevard network.
Recently, jurisdictions have been using larger, more visible pavement markings.
Shared lane markings may be used as bicycle boulevard markings. Portland, OR is moving towards this option.
In Berkeley, California, non-standard pavement markings include larger-scale lettering and stencils to clearly inform motorists and bicyclists of a street’s function as a bicycle boulevard.
On-Street Parking Delineation
Delineating on-street parking spaces with paint or other materials clearly indicates where a vehicle should be parked and can discourage motorists from parking their vehicles too far into the adjacent travel lane. This marking helps bicyclists by maintaining a wide enough space to safely share a travel lane with moving vehicles while minimizing the need to swerve farther into the travel lane to maneuver around parked cars. In addition to benefiting bicyclists, delineated parking spaces also promote the efficient use of on-street parking by maximizing the number of spaces in high-demand areas.
Guidance
Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design Tools and Guidelines AASHTO Guide for the Development of Bicycle Facilities California MUTCD
B-16
Level 3: Bicycle Routes/Boulevards at Minor Unsignalized Intersections Design Summary
Stop signs effectively minimize conflicts
along bicycle boulevards.
Curb extensions can be a good location for
pedestrian amenities, including street trees.
Bicycle forward stop bars encourage
bicyclists to wait where they are more
visible.
Encourage use of bicycle boulevards, enhance bicyclist safety and reduce bicycle travel time by eliminating unnecessary stops and improving intersection crossings
Discussion
Stop Sign on Cross-Street
Unmarked intersections are concerning for bicyclists because crosstraffic may not be looking for them. Stop signs are a relatively inexpensive treatment to minimize bicycle and cross-vehicle conflicts. However, placing stop signs at all intersections along bicycle boulevards may be unwarranted as a traffic control measure.
Yield signs should be considered if stop signs are not warranted.
Curb Extensions and High-Visibility Crosswalks
This treatment is appropriate near activity centers with large amounts of pedestrian activity, such as schools or commercial areas.
Curb extensions should only extend across the parking lane and not obstruct bicyclists’ path of travel or the travel lane. Curb extensions and high-visibility crosswalks both calm traffic and increase the visibility of pedestrians waiting to cross the street.
Bicycle Forward Stop Bar
A second stop bar for bicyclists placed closer to the centerline of the cross street than the first stop bar increases the visibility of bicyclists waiting to cross a street. This treatment is typically used with other crossing treatments (i.e. curb extension) to encourage bicyclists to take full advantage of crossing design. They are appropriate at unsignalized crossings where fewer than 25 percent of motorists make a right turn movement.
Guidance
Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design Tools and Guidelines
AASHTO Guide for the Development of Bicycle Facilities. California MUTCD, Part 9
B-17
114 | CITY OF NATIONAL CITY
Level 3: Bicycle Routes/Boulevards at Major Unsignalized Intersections Design Summary
Medians on bicycle boulevards should
provide space for a bicyclist to wait.
Half-signals for bicyclists should be clearly
marked to minimize confusion.
Example of instructional signage from
Portland, OR.
Increase crossing opportunities with medians and refuge islands
Instructional and regulatory signage should be considered with installation of a bicycle signal. Instructional signage is not standard in the State of California. Part 4 of the California MUTCD covers bicycle signals
Discussion
Medians/Refuge Islands
At uncontrolled intersections at major streets, a crossing island can be provided to allow bicyclists to cross one direction of traffic at a time when gaps in traffic allow. The bicycle crossing island should be at least 8’ wide to be used as the bicycle refuge area. Narrower medians can accommodate bicycles if the holding area is at an acute angle to the major roadway. Crossing islands can be placed in the middle of the intersection, prohibiting left and through vehicle movements.
Bicycle Signals
Bicycle signals have been an approved traffic control device in California since the technology was studied and approved after years of service in the City of Davis. A bicycle signal provides an exclusive signal phase for bicyclists traveling through an intersection. This element takes the form of a new signal head installed with red, amber, and green bicycle indications. Bicycle signals can be actuated with bicycle-sensitive loop detectors, video detection, or push buttons.
Where few crossing gaps exist and major street traffic does not typically stop for pedestrians and bicyclists waiting to cross, “half signals” can be installed to improve the crossing environment. Half signals include pedestrian and bicycle activation buttons and may also include loop detectors on the bicycle boulevard approach. Many of these models have been used successfully for years overseas, and their use in the U.S. has increased dramatically over the last decade.
Guidance
Note: While bicycle signals are approved for use in California, information should be provided such that at intersections with bicycle signals, bicycles should only obey the bicycle signal heads. Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design Tools and Guidelines
AASHTO Guide for the Development of Bicycle Facilities California MUTCD
B-18
Level 3: Bicycle Routes/Boulevards at Offset Intersections Design Summary
Example of a bicycle left-turn lane.
This bicycle-only left-turn pocket guides bicyclists
along a popular bicycle route.
Installing turning lanes or pockets at offset intersections provides bicyclists with a refuge to make a two-step turn Bicycle left turn lanes – 5 feet wide minimum, with a total of 11 feet required for both turn lanes and center striping Discussion
Offset intersections can be challenging for bicyclists, who need to transition onto the busier cross-street in order to continue along the boulevard.
Bicycle Left-Turn Lane
Similar to medians/refuge islands, bicycle left-turn lanes allow the crossing to be completed in two phases. A bicyclist on the boulevard can execute a right-hand turn onto the cross-street and then wait in a delineated left-turn lane for a gap in oncoming traffic.
Bicycle Left -Turn Pocket
A bicycle-only left-turn pocket permits bicyclists to make left turns while restricting vehicle left turns. If the intersection is signalcontrolled, a left arrow signal may be appropriate, depending on bicycle and vehicle volumes. Signs should be provided prohibiting motorists from turning. Ideally, the left turn pocket should be protected by a raised curb, but the pocket may also be defined by striping if necessary. Because of the restriction on vehicle leftturning movements, this treatment also acts as traffic diversion.
Guidance
B-19
Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
AASHTO Guide for the Development of Bicycle Facilities
116 | CITY OF NATIONAL CITY
Level 4: Bicycle Boulevard Traffic Calming
Design Summary
Chicanes require all vehicles to slow down.
Traffic circles provide an opportunity for
landscaping, but visibility should be maintained.
Speed humps are a common traffic calming
treatment.
Traffic calming treatments are intended to reduce vehicle speeds, enabling motorists and bicyclists to safely co-exist on the same facility
Discussion
Chicanes
Chicanes are a series of raised or delineated curb extensions on alternating sides of a street forming an S-shaped curb, which reduce vehicle speeds through narrowed travel lanes and horizontal deflection. Chicanes can also be achieved by establishing on-street parking on alternating sides of the street.
These treatments are most effective on streets with narrower crosssections.
Mini Traffic Circles
Mini traffic circles are raised or delineated islands placed at intersections, reducing vehicle speeds through tighter turning radii and narrowed vehicle travel lanes (see right). These devices can effectively slow vehicle traffic while facilitating all turning movements at an intersection. Mini traffic circles can also include a paved apron to accommodate the turning radii of larger vehicles like fire trucks or school buses.
Speed Humps
Shown to the right, speed humps are rounded raised areas of the pavement requiring approaching motor vehicles to reduce speeds.
These devices also discourage through vehicle travel on a bicycle boulevard when a higher-order, parallel route exists. Speed humps should never be constructed so steep that they may cause a bicyclist to lose control or be distracted. In some cases, a gap may be provided allowing bicyclists to continue on the level roadway surface, while still requiring vehicles to slow down to cross the barrier.
Curb Extensions and High-Visibility Crosswalks
See previous discussion in section Level 3: Bicycle
Routes/Boulevards at Minor Unsignalized Intersections.
Guidance
Alta Planning + Design and IBPI. Fundamentals of Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design Tools and Guidelines
AASHTO Guide for the Development of Bicycle Facilities B-20
Level 5: Bicycle Boulevard Traffic Diversion
Design Summary
Choker entrances prevent vehicular traffic from turning from a major street onto a traffic-calmed bicycle boulevard.
Traffic diverters prevent through-vehicle traffic as well as cross-traffic.
Traffic diversion treatments maintain through
bicycle travel on a street while physically
restricting through vehicle traffic
Traffic diversion is most effective when higherorder streets can sufficiently accommodate the diverted traffic associated with these treatments
Discussion
Choker Entrances
Choker entrances are intersection curb extensions or
raised islands allowing full bicycle passage while
restricting vehicle access to and from a bicycle
boulevard. When approaching a choker entrance at a
cross-street, motorists on the bicycle boulevard must
turn onto the cross-street while bicyclists may continue forward. These devices can be designed to permit some
vehicle turning movements from a cross-street onto the
bicycle boulevard, while restricting other movements.
Traffic Diverters
Similar to choker entrances, traffic diverters are raised features directing vehicle traffic off the bicycle
boulevard while permitting through bicycle travel.
Advantages:
Provides safe refuge in the median of the major
street so that bicyclists only have to cross one
direction of traffic at a time; works well with
signal-controlled traffic platoons coming from
opposite directions
Provides traffic calming and enhances safety by
preventing left turns and/or through traffic from
using the bicycle boulevard
Disadvantages:
May increase travel time for motorists and
potentially result in loss of parking
Crossing island requires maintenance
Guidance
Alta Planning + Design and IBPI. Fundamentals of
Bicycle Boulevard Planning & Design:
https://trec.pdx.edu/sites/default/files/
BicycleBoulevardGuidebook(optimized).pdf
City of Berkeley. (2000). Bicycle Boulevard Design
Tools and Guidelines
AASHTO Guide for the Development of Bicycle
Facilities
B-21
118 | CITY OF NATIONAL CITY
6.6 Off–Street Bicycle Facility Design Guidelines
Off-Street Facility Design Guidelines
A Class I facility allows for two-way, off-street bicycle traffic and may also be used by pedestrians, skaters, wheelchair users, joggers, and other non-motorized modes. These facilities are frequently found in parks, along rivers, and in greenbelts or utility corridors where there are few conflicts with motorized vehicles. Class I facilities can also include amenities such as lighting, signage, and fencing (where appropriate). In California, design of Class I facilities is dictated by Chapter 1000 of the Highway Design Manual.
Shared-use paths can provide a desirable facility particularly for novice riders, recreational trips, and bicyclists of all skill levels preferring separation from traffic. Shared-use paths will generally provide new travel opportunities.
Shared-use paths serve bicyclists and pedestrians and provide additional width over a standard sidewalk. Facilities may be constructed adjacent to roads, through parks, or along linear corridors such as active or abandoned railroad lines or waterways. Regardless of the type, paths constructed next to the road must have some type of vertical (e.g., curb or barrier) or horizontal (e.g., landscaped strip) buffer separating the path from adjacent vehicle travel lanes.
Elements that enhance shared-use path design include:
Providing frequent access points from the local roadway network; if access points are spaced too far apart, users will have to travel out of direction to enter or exit the path, which will discourage use
Placing directional signs to direct users to and from the path
Designing a strong enough structural section to allow heavy maintenance equipment to use the path without
causing it to deteriorate
Limiting the number of at-grade crossings with streets or driveways
Terminating the path where it is easily accessible to and from the street system, preferably at controlled
intersections or at the beginning of a dead-end street. If not properly designed, the point where the path joins the street network can put pedestrians and bicyclists in a
position where motor vehicles are not expecting to see
them
Identifying and addressing potential safety and security issues up front
Whenever possible, and especially where heavy use can be expected, separate bicycle and pedestrian ways
should be provided to reduce conflicts
Providing accessible parking spaces at trailheads and access points
Shared-use paths (also referred to as “trails”
and “multi-use paths”) are often viewed as
recreational facilities, but they are also
important corridors for utilitarian trips.
B-22
BICYCLE MASTER PLAN | 119
6.6.1 Shared-Use Path Design
Shared-Use Path Design
Design Summary
Recommended shared-use path design.
The Cedar Lake Regional Trail in Minneapolis, MN
has sufficient width to accommodate a variety of
users.
Width standards:
o 8 feet is the minimum allowed for a two-way
multi-use path and is only recommended for
lower facility use
o 10 feet is recommended in most situations and
will be adequate for moderate to heavy use
o 12 feet is recommended for heavy use
situations with high concentrations of multiple
users such as joggers, bicyclists, rollerbladers
and pedestrians
Lateral Clearance: 2’ or greater shoulder on both
sides (required by Caltrans’ HDM, Chapter 1000)
Overhead Clearance: 10’ minimum recommended
Maximum design speed: 20 mph; speed bumps or
other surface irregularities should never be used to
slow bicycles
Recommended maximum grade: 5%; steeper
grades can be tolerated for short distances (see
guidelines following)
Discussion
A hard surface should be used for multi-use trails.
Concrete, while more expensive than asphalt, is the
hardest of all trail surfaces and lasts the longest. However, joggers and runners prefer surfaces such as asphalt or
decomposed granite due to its relative “softness”. While most asphalt is black, dyes (such as reddish pigments) can be added to increase the aesthetic value of the trail itself.
When concrete is used the trail should be designed and
installed using the narrowest possible expansion joints to minimize the amount of ‘bumping’ bicyclists experience
on the trail.
Shared-use paths should be designed according to ADA
standards. Constructing trails may have limitations that make meeting ADA standards difficult and sometimes
prohibitive. Prohibitive impacts include harm to significant cultural or natural resources, a significant change in the intended purpose of the trail, construction methods that do not comply with federal, state, or local regulations, or presence of terrain characteristics that prevent
compliance.
Guidance
U.S. Access Board (2014). Accessibility Standards for Federal Outdoor Developed Areas:
https://www.access-board.gov/files/aba/guides/
outdoor-guide.pdf
U.S. Access Board (2013). Public Rights-of-Way
Accessibility Guidelines:
https://www.access-board.gov/files/prowag/PROWSUP-SNPRM-2013.pdf AASHTO Guide for the Development of Bicycle Facilities B-23
120 | CITY OF NATIONAL CITY
Trail Accessibility
Design Summary
ADA clearance requirement.
Shared-use paths surfacing materials affect
which types of users can benefit from the
facility.
Where less than 5’, a 3’ minimum clear width passing
space should be provided at least every 100’
Cross slope should not exceed 5%
Provide signs indicating the length of the accessible trail segment
Provide curb ramps at roadway crossings and curbs.
Tactile warning strips and audible crossing signals are recommended
Discussion
Slopes should not exceed 5%. However, certain conditions may require the use of steeper slopes. For conditions exceeding a 5% slope, the recommendations are as follows:
Up to an 8.3% slope for a 200 feet maximum run; landings or resting intervals must be provided every 20’
Up to a 10% slope for a 30 feet maximum run; resting
intervals spaced at 30 feet minimum
Up to 12.5 % slope for 10 feet maximum run; resting
intervals spaced at 10 feet minimum
The trail surface shall be firm and stable. The Forest Service Accessibility Guidelines defines a firm surface as a trail surface that is not noticeably distorted or compressed by the passage of a device that simulates a person who uses a wheelchair. Where ROWs are available, paths which exceed a 5% slope can be made more accessible by creating side paths that meander away from the primary path.
Guidance
American with Disabilities Act (ADA) for accessible trails U.S. Access Board (2014). Accessibility Standards for Federal Outdoor Developed Areas:
https://www.access-board.gov/files/aba/guides/outdoorguide.pdf Forest Service Accessibility Guidelines
B-24
Managing Multiple Users
Design Summary
Centerline striping and directional arrows
encourage bicyclists to provide space for other
trail users to pass.
Recommended design for a separated shared-use
path.
A commonly used multi-use trail etiquette sign.
Barrier separation – vegetated buffers or barriers,
elevation changes, walls, fences, railings and bollards Distance separation – differing surfaces
User behavior guidance signage
Discussion
On trails that have high bicycle and pedestrian use, conflicts can arise between faster-moving bicyclists and slower
bicyclists, as well as pedestrians and other users. As this conflict is a common problem in more urban areas, a variety of treatments have been designed to alleviate congestion and minimize conflicts.
Centerline Striping
On trails of standards widths, striping the centerline
identifies which side of the trail users should be on.
Physical Separation
Differing surfaces suitable to each user group foster visual separation and clarity of where each user group should be.
When trail corridors are constrained, the approach is often to locate the two different trail surfaces side by side with no separation.
Offsetting of the pedestrian path should be provided if possible. Otherwise, physical separation should be provided in the form of a small hump or other crossable barrier.
The bicycle path should be located on whichever side of the path will result in the fewest number of anticipated
pedestrian crossings. For example, the bicycle path should not be placed adjacent to large numbers of destinations. Site analysis of each project is required to determine expected pedestrian behavior.
Trail Etiquette Signage
Informing trail users of acceptable trail etiquette is important when multiple user types are anticipated. Yielding the rightof-way is a courtesy and a necessary part of a safe trail experience involving multiple trail users. Trail right-of-way information should be posted at trail access points and along the trail. The message must be clear and easy to understand.
Where appropriate, trail etiquette systems should instruct trail users to the yielding of bicyclists to pedestrians and equestrians and the yielding of pedestrians to equestrians.
Guidance
California MUTCD, Part 9. Section 9C.03 contains
additional information about centerline striping on a
trail
B-25
122 | CITY OF NATIONAL CITY
Trails Along Roadways
Design Summary
Trails directly adjacent to roadways can be
challenging for users at roadway intersections.
5’ minimum buffer should separate the path from
the edge of the roadway; otherwise, a physical
barrier should be installed
Shared-use paths may be considered along roadways
under the following conditions:
The path will generally be separated from all motor
vehicle traffic
Bicycle and pedestrian use is anticipated to be high
To provide continuity with an existing path through a roadway corridor
The path can be terminated at each end onto streets
or trails with good bicycle and pedestrian facilities
There is adequate access to local cross-streets and
other facilities along the route
Any needed grade separation structures do not add
substantial out-of-direction travel
The total cost of providing the proposed path is
proportionate to the need, compared to the cost of
providing on-street facilities
Discussion
Concerns about shared-use paths directly adjacent to roadways (e.g., with minimal or no separation) are:
Half of bicycle traffic may ride against the flow of vehicle traffic, contrary to the rules of the road When the path ends, bicyclists riding against traffic tend to continue to travel on the wrong side of the street, as do bicyclists who are accessing the path. Wrong-way bicycle travel is a major cause of crashes At intersections, motorists crossing the path often do not notice bicyclists approaching, especially where sight distances are poor
Bicyclists are required to stop or yield at cross-streets and driveways, unless otherwise posted Stopped vehicles on a cross-street or driveway may block the path Because of the proximity of vehicle traffic to opposing bicycle traffic, barriers are often necessary to separate motorists from bicyclists. This type of improvement increases construction and maintenance costs Paths directly adjacent to high-volume roadways diminish users’ experience by placing them in an uncomfortable environment
As bicyclists gain experience and realize some of the advantages of riding on the roadway, some riders stop using paths adjacent to roadways. Bicyclists may also tend to prefer the roadway as pedestrian traffic on the shared use path increases. When designing a bikeway network, the presence of a nearby or parallel path should not be used as a reason to forego adequate shoulder or bicycle lane width on the roadway, as the on-street bicycle facility will generally be superior to the “sidepath” for experienced bicyclists and those who are bicycling for transportation purposes. Bicycle lanes should be provided as an alternate (more transportation-oriented) facility whenever possible.
Guidance
Both the California Highway Design Manual Chapter 1000 and the AASHTO Guide for the Development of Bicycle Facilities recommend against the development of multi-use paths directly adjacent to roadways without providing adequate buffers/barriers between path users and motorists.
B-26
6.6.2 Path/Roadway Crossings
Path/Roadway Crossings
Design Summary
An offset crossing forces pedestrians to turn and
face the traffic they are about to cross.
At-grade path/roadway crossings will generally fit into one of four basic categories:
Type 1: Marked/Unsignalized Crossings - Include trail crossings of residential, collector, and sometimes
arterial streets or railroad tracks. May include flashing beacons and other treatments to enhance visibility
Type 2: Route Users to Existing Signalized
Intersections - Trails that emerge near existing
signalized intersections may be routed to these
locations provided that sufficient protection is
implemented at the existing intersection
Type 3: Signalized/Controlled Crossings – Include trail crossings that require signals or other control
measures due to high traffic volumes, speeds, and trail usage
Type 4: Grade-Separated Crossings - Bridges or undercrossings provide the maximum level of safety but are also generally the most expensive to build and
maintain
Discussion
While at-grade crossings create conflicts between path users and motorists, well-designed crossings have not historically presented safety issues for path users. This trend is evidenced by the thousands of successful paths around the United States with at-grade crossings. In most cases, at-grade path crossings can be properly designed to meet existing traffic safety standards.
Evaluation of path crossings involves analysis of vehicular and anticipated path user traffic patterns, including:
Vehicle speeds
Street width
Sight distance
Traffic volumes (average daily traffic and peak hour traffic) Path user profile (age distribution, destinations served) Crossing features for all roadways should include warning signs for both vehicles and path users.
Consideration must be given for proper warning distance based on vehicle speeds and line of sight. Signs must be clearly visible to drivers. Treatments such as flashing lights, enhanced roadway striping, and changes in pavement texture can improve driver awareness of the crossing. Signing for path users must include a standard “STOP” sign and pavement markings, sometimes combined with other features such as bollards or a deflection in the pathway to slow bicyclists.
Guidance
Federal Highway Administration (FHWA) Report (2005), Safety Effects of Marked vs. Unmarked Crosswalks at Uncontrolled Locations.
https://www.fhwa.dot.gov/publications/research/safety/04100/04100.pdf California Highway Design Manual, Chapter 1000
AASHTO Guide for the Development of Bicycle Facilities B-27
126 | CITY OF NATIONAL CITY
Type 1: Marked/Unsignalized Crossings
Uncontrolled Mid-Block Crossing
Design Summary
Recommended design from CA-MUTCD, Figure 3B-15
Recommended signage from FHWA-MUTCD, Figure 9B-3
Installed where there is a high demand
for crossing and no nearby existing
signalized crossings
If yield lines are used for vehicles, they
shall be placed 20–50’ in advance of the
nearest crosswalk line to indicate the
point at which to yield and ‘Yield Here to
Pedestrians’ signs shall be placed
adjacent to the yield line
The Bicycle Warning (W11-1) sign may be
used to alert road users of unexpected
entries into the roadway by bicyclists
A ladder-style crosswalk may be used to
enhance visibility
Warning signs and markings on the path
should be installed
Discussion
The California MUTCD recommends the use of
yield lines and “Yield Here to Pedestrians” signs
at uncontrolled crossings of a multi-lane
roadway. The Federal MUTCD includes a trail
crossing sign (W11-15 and W11-15p), which may
be used where both bicyclists and pedestrians
cross the roadway, such as at an intersection
with a shared-use path.
Guidance
California MUTCD, Part 9
FHWA-MUTCD, Part 9
AASHTO Guide for the Development of Bicycle Facilities B-28
Type 2: Route Users to Existing Signalized Intersections Design Summary
Recommended diversion of shared-use path to existing
signalized intersection where path is within 350 feet of signalized intersection.
A path should cross at a signalized
intersection if there is a signalized
intersection within 350 feet of the
path and the crossroad is a highvolume arterial
Intersection warning signs (W2-1
through W2-5) may be used on the
path to indicate the presence of an
intersection and the potential for
turning or entering traffic. A trailsized stop sign (R1-1) should be placed about 5 feet before the
intersection
This option eliminates conflicting vehicle
traffic by redirecting path users.
Discussion
Shared-use paths within 350 feet of an
existing signalized intersection with
pedestrian actuation are typically diverted to
the signalized intersection to enhance safety.
For this option to be effective, barriers and
signage should be implemented to direct
shared-use path users to the signalized
crossings.
Guidance
California Highway Design Manual, Chapter 1000
California MUTCD, Part 9
AASHTO Guide for the Development of Bicycle Facilities AASHTO Policy on the Geometric Design of Highways and Streets FHWA-RD-87-038 Investigation of Exposure-Based Pedestrian Accident Areas: Crosswalks, Sidewalks, Local Streets, and Major Arterials
2 2010
B-29
128 | CITY OF NATIONAL CITY
Type 3: Signalized/Controlled Crossings
Design Summary
CA-MUTCD guidance for a signalized mid-block crossing.
Type 3 Crossing
Toucan Crossing (this experimental treatment has not been approved for use in California).
Use when greater than 300 feet from an existing
signalized crossing
Use where the 85th percentile travel speeds are
greater than 40 mph and/or ADT exceeds 15,000
vehicles
Section 4C.05 in the CA MUTCD describes minimum
pedestrian volume requirements (referred to as
warrants) for a mid-block pedestrian-actuated signal
Stop lines at midblock signalized locations should be placed at least 40’ in advance of the nearest signal
indication
Discussion
New signalized crossings may be recommended for
crossings that meet pedestrian, school, or modified
warrants, are located more than 300 feet from an existing signalized intersection, where 85th percentile travel speeds are 40 mph and above, and/or ADT exceeds 15,000 vehicles.
Each crossing, regardless of traffic speed or volume, requires an engineering survey to identify sight distance, potential impacts on traffic progression, timing with adjacent signals, capacity, and safety.
Shared-use path signals are normally activated by push
buttons, but may also be triggered by motion detectors.
The maximum delay for activation of the signal should be two minutes, with minimum crossing times determined by
the width of the street. The signals may rest on flashing yellow or green for motorists when not activated and
should be supplemented by standard advanced warning
signs. As described earlier, various types of pedestrian signals, such as “half signals” may be used at Type 3
crossings.
Signalized Mid-Block Crossing
Warrants from the CA MUTCD combined with sound
engineering judgment should be applied when determining the type of traffic control device to be installed at pathroadway intersections. Pedestrian volume warrants can be applied for bicyclists.
Experimental Treatment
A Toucan crossing (derived from: “two can cross”) may be considered where pedestrians and bicyclists cross together.
Guidance
MUTCD – California, Part 3 and 9 and Section
4C.05 and 4D
AASHTO Guide for the Development of Bicycle
Facilities, Chapter 2
3 B-30
Type 4: Grade-Separated Undercrossing
Design Summary
Recommended undercrossing design.
Undercrossings provide key connections and allow path
users to avoid at-grade crossings of major streets or avoid barriers such as freeways and raillines.
14’ minimum width to allow for access by
maintenance vehicles if necessary
10’ minimum overhead height
The undercrossing should have a centerline stripe
even if the rest of the path does not have one
Lighting and/or skylights may be desirable for longer crossings to enhance users’ sense of security
Discussion
Undercrossings should be considered when high volumes
of bicycles and pedestrians are expected along a corridor and:
Vehicle volumes/speeds are high
The roadway is wide
A signal is not feasible
Crossing is needed under a grade-separated facility
such as a freeway or rail line
Advantages:
Improves bicycle and pedestrian safety while
reducing delay for all users
Eliminates barriers to bicyclists and pedestrians
Undercrossings often require less ramping and
elevation change for the user versus an overcrossing,
particularly for railroad crossings
Disadvantages:
If crossing is not convenient or does not serve a
direct connection it may not be well utilized
Potential issues with vandalism, maintenance
Security may be an issue if lighting and sight lines
through the undercrossing and approaches are
inadequate
Higher costs associated with grade separation
Guidance
AASHTO Guide for the Development of Bicycle
Facilities
Caltrans Highway Design Manual (Chapter 1000)
B-31
130 | CITY OF NATIONAL CITY
Type 4: Grade-Separated Overcrossing
Design Summary
Overcrossings are frequently used over a major roadway. 10’ minimum width, 12’ preferred
If overcrossing has scenic vistas additional width
should be provided to allow for path users to
stop
A separate 6’ pedestrian area may be provided in
locations with high bicycle and pedestrian use
Minimum of 17’ of vertical clearance to the
roadway below
10’ headroom on overcrossing
The overcrossing should have a centerline stripe
even if the rest of the path does not have one
Ramp slopes should be ADA-accessible: 5%
(1:20) grade with landings at 400’ intervals, or
8.3% (1:12) with landings every 20’
Discussion
Overcrossings require a minimum of 17 feet of vertical clearance to the roadway below versus a minimum elevation differential of approximately 12 feet for an undercrossing. This requirement results in longer ramps for bicycles and pedestrians to negotiate.
Overcrossings should be considered when high volumes of bicycles and pedestrians are expected along a corridor and:
Vehicle volumes/speeds are high
The roadway is wide
A signal is not feasible
Crossing is needed over a grade-separated facility such as a freeway or rail line Advantages:
Improves bicycle and pedestrian safety while reducing delay for all users Eliminates barriers to bicyclists and pedestrians
Disadvantages:
If crossing is not convenient or does not serve a direct connection it may not be well utilized Overcrossings require at least 17 feet of clearance to the roadway below involving up to 400 feet or greater of approach ramps at each end
Potential issues with vandalism, maintenance
Higher costs associated with grade separation
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
B-32
6.6.3 Path Amenities
Path Amenities Guidelines
Design Summary
A variety of amenities can make a path inviting to the user. Costs vary depending on the design and materials selected for each amenity. Amenities shall be designed and located so as not to impede accessibility.
Discussion
Benches
Providing benches at key rest areas and viewpoints encourages people of all ages to use the trail by ensuring that they have a place to rest along the way. Benches can be simple (e.g., wood slates) or more ornate (e.g., stone, wrought iron, concrete).
Restrooms/Drinking Fountains
Restrooms benefit path users, especially in more remote areas where other facilities do not exist. Restrooms can be sited at trailheads along the path system. Drinking fountains should be provided at restrooms to allow trail users to rehydrate and recover.
Bicycle Racks/Parking
Bicycle racks allow recreational users to safely park their bicycles if they wish to stop along the way, particularly at parks and other desirable destinations. Bicycle parking allows trail users to store their bicycles safely for a short time. Bicycle parking should be provided if a trail transitions to an unpaved pedestrian-only area.
Trash Receptacles
Trash receptacles should be placed at access points. Litter should be picked up once a week and after any special events held on the trail, except where specially designed trash cans have been installed. If maintenance funds are not available to meet trash removal needs, it is best to remove trash receptacles.
Kiosks/Wayfinding Signs
Informational kiosks with maps at trailheads and signage for key destinations can provide valuable information for trail users.
Art
Local artists can be commissioned to provide art for the pathway system, creating a sense of place. Pathway art can be functional as well as aesthetic, providing places to sit and play.
Benches and rest areas encourage trail use
by seniors and families with children.
Bathrooms are recommended for longer
trails and in more remote areas.
Art installations can provide a sense of
place for the trail.
Guidance
AASHTO Guide for the Development of Bicycle Facilities B-33
132 | CITY OF NATIONAL CITY
Pedestrian-Scale Lighting
Design Summary
Recommended pedestrian-scale lighting.
Depending on the location, average maintained horizontal illumination levels of 5 lux to 22 lux should be considered (AASHTO)
Where security problems exist, higher illumination levels may be considered
Light standards (poles) should meet the recommended horizontal and vertical clearances
Discussion
Pedestrian-scale lighting enhances safety and enables the facility to be used year-round, particularly on winter afternoons. Lights should not have a visible source, either to the trail users or to neighboring residences, as they can blind users and pollute the night sky. Low level lighting, such as very short poles or bollards, are often problematic, due to their easy access for vandalism. In some areas, street lighting provides sufficient light for trail users. If pedestrian-scale lighting is desired, some neighborhoodfriendly options include:
In-ground lighting – dim lights which indicate the extent of the path
Bollards – low-level lighting; can be susceptible to vandalism Solar lighting – best used in situations where running power to the trail would be costly or undesirable
Pedestrian-scale lighting can have screens to minimize glare. In addition, lights can be programmed to dim or turn off later in the night. A guideline for lighting a pedestrian way is illumination of between 0.5 foot-candle to 1 foot-candle.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
B-34
Bollards
Design Summary:
Bollards deter motorists from driving on the trail.
Recommended bollard designs.
Where removable bollards are used, the top of the mount point should be flush with the path’s surface so as not to create a hazard
Posts should be permanently reflectorized for night time visibility and painted a bright color for improved daytime visibility
Striping an envelope around the post is recommended
When more than one post is used, an odd number of posts at 5 feet spacing is desirable
Recommended bollard height is 4 feet
Discussion
Bollards are posts that can be used to block vehicle access to the path and can provide information such as mile markings, wayfinding for key destinations, or small area maps. Minimize the use of bollards to avoid creating obstacles for bicyclists. The California MUTCD explains “Such devices should be used only where extreme problems are encountered” (Section 9C.101).
Instead, design the path entry and use signage to alert drivers that motor vehicles are prohibited.
Flexible bollards and posts are designed to give way on impact and can be used instead of steel or solid posts. These bollards are typically made of plastic that is bolted to the roadway and bend and return to their original position when hit. They are intended to deter vehicular access but allow access for emergency vehicles and maintenance equipment.
Bollards are typically installed using one of two methods: 1) The bollard is set into a concrete footing in the ground; and 2) the bollard is attached to the surface by mechanical means
(mechanical anchoring or chemical anchor).
Where used, bollards should have high-visibility, reflective tape or paint. Bollards should be placed in the middle of the path, with sufficient space for path users of all abilities, using a variety of mobility devices, to pass. They can create bottlenecks with path users at intersections and should therefore be used with caution.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-35
134 | CITY OF NATIONAL CITY
Fencing
Design Summary:
Post and wire fence.
Open boundaries can be created where
users may be entering the trail.
Height: 4.5 ft (minimum)
Fencing provides access control, visual screening, and channeling of path users
Discussion
Fencing is a means of enhancing safety for both trail users and neighboring residents by deterring unwanted access onto or off of the trail. However, fencing both sides of the trail right of way can result in a “tunnel” effect with the perception of being trapped, resulting in a detrimental effect on the trail user experience. Additionally, solid fencing could inhibit community surveillance of the trail and should be discouraged.
Fencing should not be a barrier to wildlife passage across the corridor. A small six-inch gap between the bottom of the fence and the ground should allow smaller wildlife to pass.
Fencing that allows a balance between the need for privacy, while simultaneously allowing informal surveillance of the trail, should be encouraged. If fencing is requested purely for privacy reasons, vegetative buffers should be considered.
Some factors to consider when deciding on fencing necessity and styles include:
Cost: Fencing and other barriers, depending on the type of materials used and the length, can be costly Security: Fencing between the path and adjacent land uses can protect the privacy and security of the property owners
Fencing height: The height and design of a fence influences whether lateral movement will be inhibited. Heavyduty fencing such as wrought iron or other styles of fencing that are difficult to climb are often more expensive Noise and dust: Trail corridors adjacent to busy roadways, freeways, or rail lines may be subject to noise, dust, and vibration. Methods of reducing this impact include the addition of vegetation or baffles to fencing barriers Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
B-36
Landscaping
Design Summary:
Plantings adjacent to the trail can be attractive, but should be managed to maintain visibility and keep the path clear.
Safety and security concerns on a trail can be
addressed through Crime Prevention Through
Environmental Design (CPTED) guidelines. The four
principles of CPTED are:
Natural surveillance – maintain sight lines and
visibility to deter criminal activities
Natural access control – use of fences, lighting,
signage, and landscaping to clearly define
where people and vehicles are expected to be
Territorial reinforcement – use of physical
designs such as pavement treatments,
landscaping, and signage to develop a sense
of proprietorship over the trail
Maintenance - if graffiti or vandalism occurs
and is not addressed in a timely manner, it can
send the message that no one is watching or
that no one cares
Discussion
Whether natural or planted, vegetation can serve as both a visual and physical barrier between a roadway and a path, make the path more attractive, and provide shelter from the sun. The density and species of plants in a vegetative barrier determine how effective the barrier can be in deterring potential trespassers. A dense thicket can be, in some cases, just as effective as a fence (if not more so) in keeping trail users off restricted areas. Even tall grasses, although less effective than trees and shrubs, can discourage trail users from venturing into these areas. Planted barriers typically take a few years before they become effective barriers. Separation of the path may need to be augmented with other temporary barriers until planted trees and hedges have sufficiently matured.
All proposed trailside, trailhead, and screen landscaping should consist of an approved native and drought-tolerant plant palette. A preliminary plant palette should be designed in conjunction with local botanical expertise, biological expertise, and landscape architectural consultation.
Guidance
Trail landscaping guidelines are not discussed in great detail within the AASHTO Guide or Caltrans Highway Design Manual, Chapter 1000, but are briefly referenced as a buffer or retaining mechanism B-37
136 | CITY OF NATIONAL CITY
Trailheads
Design Summary:
Example major trailhead.
Example minor trailhead.
Major trailheads should
include automobile and
bicycle parking, trail
information (maps, user
guidelines, wildlife
information, etc.), trash
receptacles, and restrooms
Minor trailheads can provide
a subset of these amenities
Discussion
Good access to a path system is a
key element for its success.
Trailheads (formalized parking
areas) serve the local and regional
population arriving to the path
system by car, transit, bicycle or
other modes. Trailheads provide
essential access to the shared-use
path system and include amenities
such as parking for vehicles and
bicycles, restrooms (at major
trailheads), and posted maps.
Trailheads with a small parking area
should also include bicycle parking
and accessible parking.
Neighborhood access can be
provided from local streets crossing
the trail. Parking does not need to
be provided, and in some cases “No
Parking” signs are desirable to
minimize impacts to the
neighborhood.
Guidance
AASHTO Guide for the
Development of Bicycle
Facilities
B-38
6.7 Wayfinding Standards and Guidelines
Wayfinding Standards and Guidelines
Design Summary:
MUTCD Sign R5-6 is a regulatory sign that designates
where bicycling is prohibited.
Warning signs are yellow, such as this combination of
W11-15 and W11-15P from the MUTCD
Wayfinding signs are green, and include directional
arrows. (MUTCD sign D1-3C).
Types of signage include:
Regulatory signs - indicate to bicyclists the traffic regulations which apply at a specific time or place on a bikeway
Warning signs - indicate upcoming changes in the
roadway or path enviroment that requires caution and
may require a reduction in speed
Guide and information signs - indicate information
for route selection, locating off-road facilities, or
identifying geographical features or points of interest Discussion
The ability to navigate through a region is enhanced by landmarks, natural features, and other visual cues. Signs placed at strategic locations can indicate to pedestrians and bicyclists their direction of travel, location of key destinations, and travel time/distance to those destinations.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-39
138 | CITY OF NATIONAL CITY
Multi-Use Trail Signage
Design Summary:
Sample trail directional sign.
Directional and shared-use path etiquette
signage.
Signage style and imagery should be consistent throughout the trail to provide the trail user with a sense of continuity, orientation, and safety
Do not over sign the trail. Where possible, incorporate signage into trailside vertical elements such as bollards
Discussion
Directional Signage
Directional signage provides orientation to the trail user and emphasizes trail continuity. Street names should be called out at all trail intersections with roadways. In addition to providing a distance reference, mileage markers are attractive to users who target exercise for set distances.
Directional signing may be useful for pathway users and motorists alike. For motorists, a sign reading “Path Xing” along with a city emblem or logo helps warn drivers and promote use of the path itself.
The directional signing should impart a unique theme so path users know which path they are following and where it goes. The theme can be conveyed in a variety of ways such as, engraved stone, medallions, bollards, and mile markers.
Directional signage should identify key destinations along the trail route and include schools, parks, municipal centers, connecting trails, and other points of interest.
Trail Etiquette Signage
Establishing goals and policies sets a common framework for understanding trail rules and regulations. Rights and responsibilities of trail usage should be stated at main trail access points. Once rules and regulations are established, the trail managing agency has a means of enforcement. Local ordinances may be adopted to help enforce trail policies. Penalties such as fines or community service may be imposed in response to non-compliance.
Interpretive Signage
Interpretive signage enriches the trail user experience, focuses attention on the unique attributes of the local community, and provides educational opportunities. Natural and cultural resources in trail corridors, including historic signs and photos, boat ramps, and wildlife may provide opportunities for interpretation.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-40
On-Street Bikeway Signage
Design Summary:
Wayfinding signage concept MUTCD signs
D1-3C.
Wayfinding that includes distance and time
can aid bicyclists in route finding.
Destinations for on-street bikeway signage may include:
Other bikeways
Commercial centers
Parks and trails
Public transit stations
Civic/community destinations
Hospitals
Schools
Recommended uses for on-street signage include:
Confirmation signs - confirm that a bicyclist is on a designated bikeway. Confirmation signs can include destinations and their associated distances, but not directional arrows
Turn signs - indicate where a bikeway turns from one street onto another street. Turn signs are located on the near-side of intersections Decision signs - mark the junction of two or more bikeways. Decision signs are located on the near-side of intersections. They can include destinations and their associated directional arrows, but not distances Discussion
Signage can provide wayfinding and enhance safety by:
Familiarizing users with the pedestrian and bicycle network Helping users identify the best routes to key destinations Addressing misperceptions about time and distance
Helping overcome a “barrier to entry” for infrequent bicyclists or pedestrians (e.g., “interested but concerned” bicyclists) Bicycle wayfinding signs also visually cue motorists that they are driving along a bicycle route and should use caution.
Signs are typically placed at key locations leading to and along bicycle routes, including the intersection of multiple routes.
Too many road signs tend to clutter the ROW. It is recommended that bikeway signs be posted at a level most visible to bicyclists and pedestrians, rather than per vehicle signage standards. Additional recommended guidelines include:
Place the closest destination to each sign in the top slot. Destinations that are further away can be placed in slots two and three. This placement allows the nearest destination to ‘fall off’ the sign and subsequent destinations to move up the sign as the bicyclist approaches.
Use pavement markings to help reinforce routes and directional signage. Markings, such as bicycle boulevard symbols, may be used in addition to or in place of directional signs along bicycle routes. Pavement markings can help bicyclists navigate difficult turns and provide route reinforcement.
Guidance
City of Oakland. (2017). Design Guidelines for Bicycle Wayfinding Signage City of Portland (2002). Bicycle Network Signing Project B-41
140 | CITY OF NATIONAL CITY
6.8 Bicycle Parking
Bicycle Parking
Design Summary
Short-term parking accommodates visitors, customers, messengers, and others expected to depart within two hours.
This parking requires approved standard rack(s), appropriate location and placement, and weather protection Long-term parking accommodates employees, students, residents, commuters, and others expected to park more than two hours. This parking is to be provided in a secure, weather-protected manner and location.
Discussion
Bicycle Rack Placement Guidelines
Design Issue Recommended Guidance
Minimum Rack
Height
To increase visibility to pedestrians, racks should have a minimum height of 33 inches or be indicated or cordoned off by visible markers.
Signing Where bicycle parking areas are not clearly visible to approaching bicyclists, signs at least 12 square inches should direct them to the facility. The sign should include the name, phone number, and location of the person in charge of the facility, where applicable.
Lighting Lighting of not less than one foot-candle illumination at ground level should be provided in all bicycle parking areas.
Frequency of Racks
on Streets
In popular retail areas, two or more racks should be installed on each side of each block. This frequency does not eliminate the inclusion of racks which do not fall in these areas by requests from the public. Areas officially designated or used as bicycle routes may warrant the consideration of more racks.
Location and Access Access to facilities should be convenient. Where access is by sidewalk or walkway, ADA-compliant curb ramps should be provided where appropriate. Parking facilities intended for employees should be located near the employee entrance, and those for customers or visitors near main public entrances. Convenience should be balanced with the need for security if the employee entrance is not in a well traveled area.
Bicycle parking should be clustered in lots not to exceed 16 spaces each. Large expanses of bicycle parking make it easier for thieves to be undetected.
Locations within
Buildings
Provide bicycle racks within 50 feet of the entrance. Where a security guard is present, provide racks behind or within view of a security guard. The location should be outside the normal flow of pedestrian traffic.
Locations near
Transit Stops
To prevent bicyclists from locking bicycles to bus stop poles (which can create access problems for transit users, particularly those with disabilities) racks should be placed in close proximity to transit stops where there is a demand for short-term bicycle parking.
Locations within a
Campus-Type
Setting
Racks are useful in a campus-type setting at locations where the user is likely to spend less than two hours, such as classroom buildings. Racks should be located near the entrance to each building. Where racks are clustered in a single location, they should be surrounded by a fence and watched by an attendant. The attendant can often share this duty with other duties to reduce or eliminate the cost of labor being applied to bicycle parking duties; a cheaper alternative to an attendant may be to site the fenced bicycle compound in a highly visible location on the campus. For long-term parking needs of employees and students, attendant parking and/or bicycle lockers are recommended.
Retrofit Program In established locations, such as schools, employment centers, and shopping centers, the city should conduct bicycle audits to assess bicycle parking availability and access, and add additional bicycle racks where necessary.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-42
Short-Term Bicycle Parking
Design Summary:
Standard bicycle ‘staple’ rack.
Art racks can be an attractive way of marketing
bicycle parking.
See dimensions below
Discussion
Short-term bicycle parking facilities include racks which permit the locking of the bicycle frame and at least one wheel to the rack, and support the bicycle in a stable position without damage to the wheels, frame, or components. Short-term bicycle parking is currently provided at no charge at various locations in National City. Such facilities should continue to be free, as they provide minimal security but encourage cycling and promote proper bicycle parking.
The majority of short-term bicycle parking is provided via a ‘staple’ on the sidewalk, located within the buffer zone.
Art racks can be an attractive way of providing bicycle parking facilities.
Costs can be subsidized by businesses sponsoring racks that compliment their business (e.g., a pair of glasses for an optician).
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
Staple rack parking configuration.
B-43
142 | CITY OF NATIONAL CITY
Long-Term Bicycle Parking
Design Summary:
Bicycle lockers at a transit station.
Dimensions and configuration depends on the type of parking Discussion
Long-term bicycle parking facilities are intended to provide secure, longterm bicycle storage. Long-term facilities protect the entire bicycle, its components, and accessories against theft and inclement weather, including snow and wind-driven rain. Examples include lockers, check-in facilities, monitored parking, restricted access parking, and personal storage.
Long-term parking facilities are more expensive to provide than shortterm facilities but are also significantly more secure. Although many bicycle commuters would be willing to pay a nominal fee to guarantee the safety of their bicycle, long-term bicycle parking should be free wherever automobile parking is free. Potential locations for long-term bicycle parking include transit stations, large employers, and institutions where people use their bicycles for commuting rather than consistently throughout the day.
Guidance
AASHTO Guide for the Development of Bicycle Facilities Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-44
6.9 Maintenance and Construction
Bicycle Access through Construction Zones
Design Summary:
Recommended signage placement.
Bicyclists should not be led into conflicts with work site vehicles, equipment, moving vehicles, open trenches, or temporary construction signage
Efforts should be made to re-create a bicycle lane (if one exists) to the left of the construction zone. If re-creation is not possible, then a standard-width travel lane should be considered
Construction signage actions:
o Place in a location that does not obstruct the path of bicyclists or pedestrians (see graphic)
o Detour and/or closure signage related to bicycle travel should be included on all bikeways where construction activities occur.
Signage should also be provided on all other impacted
roadways
Recommendations for bicycle travel over steel plates:
o Ensure that steel plates do not have a vertical edge greater than ¼” without an asphalt lip
o Use non-skid steel plates without a raised steel bar
o Require temporary asphalt (cold mix) around plates to create a smooth transition
o Use steel plates only as a temporary measure during
construction, not for extended periods
o Use warning signage where steel plates are in use
Discussion
Safety of all roadway users must be considered during road construction and repair. Wherever bicycles are allowed, measures should be taken to provide for the continuity of a bicyclist’s trip through a work zone area. Detouring pedestrians and bicyclists to another street when travel vehicle lanes remain open should be avoided unless necessary to maintain safety. Contractors performing work for the city should be made aware of the needs of bicyclists and be properly trained in how to safely route bicyclists through or around work zones.
Steel Plates
Steel plates used to cover trenches typically have a 1” to 2” vertical transition on the edges, which can puncture a hole in a bicycle tire and cause a bicyclist to lose control. Bicyclists are often left on their own to merge with vehicles in the adjacent travel lane. Although it is common to use steel plates during non-construction hours, they can be slippery, particularly when wet. Use of temporary asphalt on edges and advanced warning signs can enhance safety for bicyclists.
Guidance
Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-45
144 | CITY OF NATIONAL CITY
Bikeway Maintenance
Design Summary: Recommended Walkway and Bikeway Maintenance Activities
Maintenance
Activity
Frequency
Inspections Seasonal and/or
after trenching
construction
Pavement
sweeping/blowing
As needed, weekly in
Fall
Pavement sealing 5 - 15 years
Pothole repair 1 week – 1 month
after report
Culvert and drainage
grate inspection
Before winter and
after major storms
Pavement markings
replacement
1 – 3 years
Signage replacement 1 – 3 years
Shoulder plant
trimming (weeds,
trees, brambles)
Twice a year; middle
of growing season
and early fall
Tree and shrub
plantings, trimming
1 – 3 years
Major damage
response (washouts,
fallen trees, flooding)
As soon as possible
Guidelines for regularly maintaining bicycle facilities are provided to the right
Discussion
Sweeping
Bicyclists often avoid shoulders and bicycle lanes filled with gravel, broken glass, and other debris; they will ride in the travel lane to avoid these hazards, causing conflicts with motorists. Debris from the roadway should not be swept
onto sidewalks (pedestrians need a clean walking surface), nor should debris be swept from the sidewalk onto the
roadway. A regularly scheduled inspection and
maintenance program helps ensure that roadway debris is properly picked up or swept.
Action items involving sweeping activities include:
Establish a seasonal sweeping schedule that prioritizes roadways with major bicycle routes
Sweep walkways and bikeways whenever there is an
accumulation of debris on the facility
In curbed sections, sweepers should pick up debris; on open shoulders, debris can be swept onto gravel
shoulders
Pave gravel driveway approaches to minimize loose
gravel on paved roadway shoulders
Provide extra sweeping in the fall where leaves
accumulate
Roadway Surface
Bicycles are more sensitive to subtle changes in roadway surface than motor vehicles. Some paving materials are smoother than others and compaction/uneven settling can affect the surface after trenches and construction holes are filled. Uneven settlement after trenching can affect the roadway surface nearest the curb where bicycles travel. Sometimes compaction is not achieved to a satisfactory level, and an uneven pavement surface can result due to settling over the course of days or weeks. When resurfacing streets, the city should use the smallest chip size and ensure that the surface is as smooth as possible to improve safety and comfort for bicyclists.
Recommended action items involving maintaining the roadway surface include:
On all bikeways, use the smallest possible chip for chip sealing bicycle lanes and shoulders During chip seal maintenance projects, if the pavement condition of the bicycle lane is satisfactory, it may be appropriate to chip seal the travel lanes only
Ensure that on new roadway construction, the finished surface on bikeways does not vary more than ¼” Maintain a smooth surface on all bikeways that is free of potholes Maintain pavement to ensure that any ridges at the gutter-to-pavement transition and adjacent to railway crossings are within ¼” of the pavement surface
Inspect the pavement 2 to 4 months after trenching construction activities are completed to ensure that excessive settlement has not occurred
B-46
Bikeway Maintenance
Discussion (continued)
Gutter-to-Pavement Transition
On streets with concrete curbs and gutters, 10”-20” of the curbside area is typically devoted to the gutter pan, where water collects and drains into catch basins. On many streets, the bikeway is situated near the transition between the gutter pan and the pavement edge. It is at this location that water can erode the transition, creating potholes and a rough surface for travel. The pavement on many streets is not flush with the gutter, creating a vertical transition between these segments.
This area can buckle over time, creating a hazardous environment for bicyclists. Since it is the most likely place for bicyclists to ride, this issue is significant for bicycle travel.
Action items related to maintaining a smooth gutter-to-pavement transition include:
Ensure that gutter-to-pavement transitions have no more than a ¼” vertical transition Examine pavement transitions during and after roadway construction projects, including maintenance activities Drainage Grates
Drainage grates are typically located in the gutter area near the curb of a roadway. Drainage grates typically have slots through which water drains into the municipal stormwater system. Many grates are designed with linear parallel bars spread wide enough for a bicycle tire to become caught, which may cause the bicyclist to tumble over the handlebars and sustain potentially serious injuries. The city should consider the following:
Continue to require all new drainage grates to be bicycle-friendly; use grates that have horizontal slats on them so that bicycle tires and assistive devices do not fall through the vertical slats Create a program to inventory all existing drainage grates and replace hazardous grates as necessary – temporary modifications such as installing rebar horizontally across the grate is not an alternative to replacement Pavement Overlays
Pavement overlays represent good opportunities to improve conditions for bicyclists. A ridge should not be left in the area where bicyclists ride (this issue occurs where an overlay extends part-way into a shoulder bikeway or bicycle lane). Overlay projects offer opportunities to widen a roadway, or to re-stripe a roadway with bicycle lanes. Action items related to pavement overlays include:
Extend the overlay over the entire roadway surface to avoid leaving an abrupt edge If there is adequate shoulder or bicycle lane width, it may be appropriate to stop at the shoulder or bicycle lane stripe, provided no abrupt ridge remains
Ensure that inlet grates and manhole and valve covers are within ¼” of the pavement surface and are made or treated with slip resistant materials
Pave gravel driveways to property line to prevent gravel from spilling onto shoulders or bicycle lanes Signage
Signage is critical for safe and comfortable use of the bicycle and pedestrian network. Signage is vulnerable to vandalism and wear and requires regular maintenance and replacement as needed. The city should consider the following:
Inspect regulatory, warning, and wayfinding signage along bikeways for signs of vandalism/graffiti and normal wear Replace signage along the bikeway network as-needed
Perform a regularly-scheduled check on the status of signage for compliance with federal, state, and regional guidelines, with follow-up as necessary
Create a Maintenance Management Plan (see below)
B-47
146 | CITY OF NATIONAL CITY
Bikeway Maintenance
Discussion (continued)
Landscaping
Bikeways can become inaccessible due to overgrown vegetation. All landscaping needs to be designed and maintained to ensure compatibility with the use of the bikeways. After a flood or major storm, bikeways should be checked along with other roads, and fallen trees or other debris should be removed promptly. Landscaping maintenance action items include:
Ensure that shoulder plants do not hang into or impede passage along bikeways After major incidents, remove fallen trees or other debris from bikeways as quickly as possible Maintenance Management Plan
Bikeway users need accommodation during construction and maintenance activities when bikeways may be closed or unavailable. Users must be warned of bikeway closures and given adequate detour information to bypass the closed section. Users should be warned through the use of standard signing in advance of each affected section (e.g., “Bicycle Lane Closed,” “Trail Closed”), including information on alternate routes and dates of closure. Alternate routes should consider travel time, roadway and traffic characteristics, and should include proper bikeway signage.
Action items related to a Maintenance Management Plan include the following:
Provide fire, police, and maintenance crews with a map of the bikeway system along with access to all removable gates/bollards
Enforce speed limits and other rules of the road
Enforce all trespassing laws for people attempting to enter adjacent private properties Guidance
Caltrans Highway Design Manual (Chapter 1000)
California MUTCD, Part 9
B-48
Appendix C: Recommended Bicycle Programs
C
168 | CITY OF NATIONAL CITY
What can kids and families expect?
Outreach begins two weeks after the start of school. Strategies to promote the program include:
Sending home materials with other school orientation materials Reaching out to/through the PTAs
Hosting a booth at back to school night
Distributing newspaper/radio ads
Creating an easy-to-use website where families can sign up online Develop and Launch a Bicycle Safety Awareness Media Campaign Target audience
Primary agency
Potential partners
Purpose
Time frame
Sample program
General public
City of National City
Regional bicycling groups, e.g., San Diego County Bicycle Coalition (SDCBC); Caltrans Increase awareness of bicycling; promote safety
Late spring or early summer, or in conjunction with Bike to Work Day or back to school Sonoma County (CA) Transit: http://www.sctransit.com/bikesafe/bikes.htm A marketing campaign that highlights bicyclist safety is an important part of creating awareness of bicycling in National City. This type of high-profile campaign is an effective way to reach the general public, highlight bicycling as a viable form of transportation, and reinforce safety for all road users.
C-1
BICYCLE MASTER PLAN | 169
A well-produced safety campaign will be memorable and effective. One good example is the Sonoma County Transit “You’ve got a friend who bikes!” campaign. It combines compelling ads with an easy-to-use website targeted towards motorists, pedestrians, and bicyclists. This type of campaign is particularly effective when kicked off in conjunction with other bicycling/walking events or back to school in the fall.
It is recommended that the city develop and launch a safety awareness campaign similar to that of Sonoma County Transit, with additional messages related specifically to safety and “sharing the road.” The safety and awareness messages should be displayed near high-traffic corridors (e.g., using signs or banners), printed in local publications, and broadcast as radio and/or television ads.
Bicycle Maps
Target audience
Primary agency
Potential partners
Purpose
Time frame
Sample programs
Current and potential bicyclists
City of National City
National City Chamber of Commerce, SDCBC, local bicycle shops Assist bicyclists in wayfinding by offering a map with clear symbols and graphics, destinations and services attractive for bicyclists, and a good selection of routes One-time, with regular updates; can happen at any time
Sample bicycle maps:
Des Moines Regional Trails Map (online):
http://www.dsmbikecollective.org/node/74/zoomify
Des Moines Regional Trails Map (PDF):
http://www.dsmbikecollective.org/dmbcfiles/maps/DM_Regional_Trails_Map.pdf Long Beach, CA: http://admin.longbeach.gov/civica/filebank/blobdload.asp?BlobID=27418 One of the most effective ways of encouraging people to bicycle for transportation and for recreation is through the use of maps and guides showing where the infrastructure exists to demonstrate how easy it is to access different parts of the city by bicycle and to highlight unique destinations, shopping districts, or recreational areas. Bicycling maps can be used to promote tourism, encourage residents to bike, and promote local business districts. Maps can be citywide, district-specific, or neighborhood/family-friendly maps.
As the on- and off-street bikeway system is further developed, the city (possibly in collaboration with other local jurisdictions) should continue to update and make available the local bicycle facilities map.
The Bicycle Advisory Committee, once established, may be able to help identify and confirm commonly used routes in addition to priority bicycle routes.
Once a bicycle map is updated, it should be made available online C-2
170 | CITY OF NATIONAL CITY
and distributed to residents by mail, at local bicycle shops, and/or at community events. The bicycle map can also be promoted through flyers in utility bills, city newsletters, and other community media outlets. The map should be updated every few years to incorporate new bikeways or other changes.
Develop a National City “Bike Central” Website
Target audience Current and potential bicyclists
Primary agency City of National City
Potential partners Regional and state bicycling groups, e.g. San Diego County Bicycle Coalition, California Bicycle Coalition
Purpose Make bicycling information easier to find by providing resources, maps, safety information, events, group listings, and more in one central place.
Time frame Ongoing
Sample programs Bike Long Beach (CA) Website: http://www.bikelongbeach.org/ As National City’s bicycle programs and infrastructure continue to expand, a “one-stop shopping” website with comprehensive bicycling information will direct current and potential bicyclists information about bicycling laws, events, maps, tips, and groups.
The National City “Bike Central” website should include:
• A list of all local and regional bicycling groups, including clubs, racing teams, and advocacy groups
• Information about the Bicycle Advisory Committee (including how to get involved, meeting times and dates, agendas, and minutes)
• Information about current projects and how to get involved (e.g. public meetings, comment periods) • Maps and other resources for National City and the region (links to online maps and brochures, project contacts, and how to request mailed materials)
• Links to laws and statutes relating to bicycling
• Bicycling tips and safety information
• Links to all relevant local jurisdictions and their bicycling contacts • Information about bicycling events (rides, classes, volunteer opportunities) • A list of local bicycle shops, including phone numbers and addresses The website may also feature:
Events calendar
Request form for route planning assistance
Message boards
C-3
BICYCLE MASTER PLAN | 171
Blog featuring stories and news
Photo galleries from events and submitted by readers
Popular ride routes
A one-stop bicycle website will not be difficult to set up, but it will only be successful if the site is both easy to use and updated regularly. All website content should be reviewed regularly for accuracy. The bicycle community can assist in keeping the site up to date. The city should consider adding a standing agenda item for the Bicycle Advisory Committee to discuss the website in order to hear about new content that should be added or out-of-date content that should be updated or removed.
Youth Bicycle Safety Education
Target School-age children
Primary agency City of National City/National School District Potential partners Parent groups at schools, community volunteers Purpose In-school and/or after-school on-bike skills and safety training Time frame Ongoing
Sample programs LAB’s Kids I and Kids II curriculum:
http://www.bikeleague.org/programs/education/courses.php#kids1 BTA’s Bike Safety Education Program: http://www.bta4bikes.org/resources/educational.php Nearly every child in America can look forward to in-depth training before receiving a driver’s license. Bicycles are also vehicles that are used on the roads, but most Americans do not receive any training about the rules of the road, how bicycles work, or how to ride a bicycle on the roadway.
National City should launch an on-bicycle education program for kids.
The curriculum should cover:
• Parts of a bicycle
• How a bicycle works
• Flat fixing
• Rules of the road
• ROW
• Road positioning
• On-bicycle skills lessons (braking, turning, steering) • On-bicycle community ride
At the time that this program is planned, the city should decide whether to start a program from scratch or modify an existing program. The League of American Bicyclists’ Smart Cycling program can be used as a foundation.
C-4
172 | CITY OF NATIONAL CITY
Adult Cycling Skills Education
Target audience
Primary agency
Potential partners
Purpose
Time frame
Parents, schoolchildren, administrators, city planners & engineers City of National City
Regional bicycling groups, e.g. SDCBC; local League Certified Instructors (LCIs) Educate adults on safe bicycling skills; encourage bicycling Flexible (one-time or on-going)
Sample programs League of American Bicyclists Smart Cycling program Most bicyclists learn to ride when they are children and do not have the opportunity to learn riding skills or safe road positioning. Adult bicycle skills training is an excellent way to improve both bicycling confidence and safety. Any training should include a significant on-bicycle section.
The League of American Bicyclists has developed a comprehensive bicycle skills curriculum that is considered the national standard for adults seeking to improve their on-bicycle skills. Various classes are offered, including basic and advanced on-road skills, as well as commuting, and driver education, and youth courses.
Local League Certified Instructors (LCIs) can be found on the League of American Bicyclists’ website.
Launch Parties for New Bicycle Facilities
Target audience
Primary agency
Potential partners
Purpose
Time frame
Sample program
General public, particularly residents living near a newly-completed facility City of National City
Regional bicycling groups, local bicycle shops
Inform residents about new bicycle facilities to encourage use and promote awareness As new bikeways are built
When a new bikeway is built, the City of Vancouver throws a neighborhood party to celebrate. Cake, tshirts, media, and festivities are provided and all neighbors are invited as well as city employees (engineers, construction staff, and planners) who worked on it.
When a new bicycle facility is built, some community
members will become aware of it and use it, but others
may not realize that they have improved options available to them. A launch party/campaign is a good way to inform community members about a new bikeway and can also
be an opportunity to share other bicycling information
(such as maps and brochures) and answer questions. It
should be a media-friendly event, with elected official appearances, ribbon cuttings, and a press release that
includes information about the new facility, other
C-5
BICYCLE MASTER PLAN | 173
facilities and support services, and any timely information about bicycling (such as an increase in bicycling or walking mode share or user counts, Bicycle Friendly Community designation, etc.).
Host National Bike-to-Work Day/Week/Month Activities
Target audience
Primary agency
Potential partners
Purpose
Time frame
Sample programs
Current and potential bicyclists
City of National City
SANDAG’s iCommute program, SDCBC, National City Chamber of Commerce, local bicycle shops, large employers
Encourage bicycling to work and other destinations by hosting group rides and events and offering incentives and rewards
Annually in May
League of American Bicyclists: http://www.bikeleague.org/bikemonth Bike Month NYC: http://bikemonthnyc.org/index.php
Bicycling to work (and to other destinations) is a great way to get exercise, save money, reduce pollution, and have fun. Cities and towns across the country participate in National Bike Month and Bike-to-Work Day/Week. The League of American Bicyclists hosts a website for event organizers. The website contains information on nationwide and local events, an organizing handbook, and promotional materials.
It is recommended that the city work with SANDAG to begin Bike-to-Work Day/Week/Month activities in National City with the support of regional bicycling groups, such as the San Diego County Bicycle Coalition, and local bicycle shops. These events and activities can target the US Naval Base, large employers, and the general public by providing information and incentives in easily accessible ways. These types of activities are likely to be popular among those who already commute by bicycle or are interested in giving bicycle commuting a try.
Possible activities to promote Bike-to-Work Week/Month/Day include:
• Bike to Work Day events: morning commute energizer
stations with food, encouragement, information, and
sponsored goodies for participants; rally or celebration with raffles, food, and vendors.
• Group rides to business centers with the mayor and/or local celebrities.
• Discounts at local businesses for bicycle commuters.
• Bike vs. Bus vs. Car challenge. This is a fun competition to determine which transportation mode arrives
downtown n the least amount of time.
• Commuter Challenge in which local companies
C-6
174 | CITY OF NATIONAL CITY
participate by recording the number of employees who bicycle to work over a given time period.
The percentage of bicycle commuters is then compared among participating companies and recognition is awarded through press, trophies or plaques, and a final award party or event. • Family or themed rides, such as a Mother’s Day Ride or a ride to visit local parks or cultural destinations. • Bicycle commuting workshops held by local groups or volunteers.
Establish a “Create a Commuter” Bicycle Program for Adults Target audience
Primary agency
Potential partners
Purpose
Time frame
Sample program
Low-income residents
City of National City
Local bicycle groups, local resident groups
Empower low-income residents to bicycle for transportation Ongoing
Community Cycling Center “Create a Commuter” Program, Portland, OR:
http://www.communitycyclingcenter.org/index.php/programs-for-adults/create-a-commuter/ A “Create a Commuter” program provides basic bicycle safety education and fully-outfitted commuter bicycles to low-income or other adults striving to connect to work, workforce development, or other daily needs by bicycle.
Bicycles can be donated by members of the community and refurbished with volunteer or local group support.
Participants are outfitted with everything a bicycle commuter would need, including fenders, front and rear lights, locks, pumps, patch kits, tools, and racks.
The program can work with local social service agencies or service providers to identify candidates. Candidates should complete a half-day bicycle safety education and commuting basics course before receiving their bicycle.
The course should cover the following topics:
• Mechanical skills
• Safety checks
• Parts identification
• Cleaning and basic maintenance
• Safe riding skills and making safe decisions on the road • Laws and rules of the road
• Helmet fitting
• Group riding skills
• Map reading
• Hand signals
C-7
The San Diego County Bicycle Coalition offers Smart Cycling classes as well as a commuting presentation that provides safety tips, information on the law, and a question and answer portion for potential commuters.
BICYCLE MASTER PLAN | 175
Host Bicycle Programs for US Naval Personnel/Staff and their Families Target audience US Naval Personnel, Staff, and Families Primary agency City of National City
Potential partners US Navy housing and service groups, regional bicycling groups Purpose Encourage Naval personnel, staff, and families to bicycle for transportation and recreation; provide bicycling education for military and civilians
Time frame One-time or ongoing, particularly as new personnel, staff, and families move to National City Bicycling programs targeted toward US Naval personnel, staff, and families residing in National City can encourage these individuals and families to choose bicycling for transportation and recreation. The programs can provide important bicycling information, such as maps and safety guidelines, or access to bicycles through giveaways or loan programs. The city should work with the appropriate agencies or groups to reach this population.
Activities may include:
• Bicycle skills/safety course for children and adults
• Summer bicycle camps for children and stay-at-home parents • Distribution of bicycling maps, brochures, and incentives to homes • Basic bicycle maintenance workshops
• Group rides or other community bicycling events
• Information about transporting children or cargo
• Bicycle safety checks, helmet giveaways, bicycle giveaways or loaner program Hold a Summer Streets Car-Free Street Event
Target audience
Primary agency
Potential partners
Purpose
Time frame
Sample programs
General public
City of National City
Local and regional bicycling groups, e.g. SDCBC; local volunteers Encourage walking and bicycling by providing a car-free street event Generally in the summer and on a Sunday; can be a one time event, annual, or multiple times per year New York City Summer Streets: http://www.nyc.gov/html/dot/summerstreets/html/home/home.shtml Portland Sunday Parkways: http://www.portlandonline.com/Transportation/index.cfm?c=46103 http://www.streetfilms.org/portlands-sunday-parkways/ (video) These programs have many names: Summer Streets, Sunday Parkways, Ciclovias, or Sunday Streets. Summer Streets are periodic street closures (usually on Sundays) that create a temporary park which is open to the public for walking, bicycling, dancing, hula hooping, roller skating, etc. They have been very successful internationally C-8
176 | CITY OF NATIONAL CITY
and are rapidly becoming popular in the United States. They promote health by creating a safe and attractive space for physical activity and social contact, and are cost-effective compared to the cost of building new parks for the same purpose. These events can be seasonal (i.e., once a month in the summer, annual, or one-time events), and are generally very popular and well-attended. Summer Streets events often include guided rides and walks with themes, such as walks for seniors, women’s or family rides, or bicycle rides with the Mayor/City Council.
7.2.1 Bicycle Sharing Program
Public bike sharing systems are comprehensive mobility
systems that use a fleet of bicycles and stations spread over an area to provide inexpensive and accessible transportation to urban communities. They have been described as a “system of individual public transport” and are well-suited to short trips, typically three miles or less. Bike sharing systems are energy efficient and zero emission as well as quick and costeffective to implement as compared to other transportation infrastructure. They can operate alone or to extend the reach of mass transit systems.
Bike share programs can provide safe and convenient access to bicycles for short trips, transit-work trips, and/or tourist trips. The international community has experimented with bike share programs for nearly share programs worldwide have experienced low to mode 40 years. Until recently, bike rate success because of theft and vandalism. In the last five years, innovations in technology that cause increased accountability have given rise to a new generation of technology-driven bike share programs. These new bike share programs can dramatically increase the visibility of cycling and lower barriers to use by requiring only that the user have a desire to bike and a smart card, credit card or cell phone.
This section contains an overview of bike share systems and summarizes key elements necessary for success.
Benefits of Bike Share Systems
Bike share programs, such as systems in Montreal, Minneapolis, Melbourne, Barcelona, Paris and Lyon, help increase bicycling mode share, complete gaps in the public transit system, reduce a city’s travel-related carbon footprint and provide additional ‘green’ jobs related to system management and maintenance. In the United States, new bicycle share programs were implemented in 2010 in Denver, CO (http://www.denverbikesharing.org/), Minneapolis, MN (https://www.niceridemn.org/) and Washington, DC (http://www.capitalbikeshare.com/).
Several other cities, including San Francisco, CA, Boston, MA and New York City, NY are planning to implement bicycle share programs within the next year, while countless other cities are considering bicycle share programs.
Transportation Carbon Intensity Reduction
Public bike systems reduce carbon intensity by reducing the number of automobile trips. This is achieved through a direct replacement of automobile trips with bicycling trips as well as by extending the reach of the transit system to make it more attractive than travelling by car. European cities with public bike systems have recorded up to a 10% direct replacement of automobile trips as well as an increase in transit ridership. Given that North Montreal’s bike share system, which debuted in
2009, features 2,400 bicycles at 300 stations
throughout the city.
C-9
CITY OF NATIONAL CITY
NOTICE OF PUBLIC HEARING
FOCUSED GENERAL PLAN UPDATE AND RELATED DOCUMENTS
NOTICE IS HEREBY GIVEN that the City Council of the City of National City will hold a Public Hearing to adopt the resolutions and ordinances for:
1) Focused General Plan Update and its Related Land Use Map, Including Minor Text and Map Amendments, and Replacing the 2011 Land Use, Transportation, and Safety Elements, and Climate Action Plan; and
2) Amending the Downtown Specific Plan; and
3) Westside Specific Plan Amendment and Amending the Zoning Text and Map of the Westside Specific Plan; and
4) Municipal Code Amendments, which include Chapter 18.49 to Provide Objective Design Standards for Housing Development, Adopting Chapter 18.50 to Provide a Floor Area Ratio Bonus Program, Adopting Amendments to Chapters 18.29 (Overlay Zones) to Create a Mixed-Use Overlay Zone to Allow Residential Development on Certain Parcels Zoned CL and CS, and Amending the Municipal Code to Revise Title 18; and
5) Update to the Bicycle Master Plan
To view the documents, visit the City of National City or at www.nationalcityca.gov/fgpu.
The City’s General Plan serves as the guiding document for achieving the community’s vision for the future. It was last updated in 2011, and with new State legislation in March 2020, National City initiated the Focused General Plan Update (FGPU). One environmental document, a Supplemental Program Environmental Impact Report (SPEIR), was prepared to analyze the FGPU and related documents. It will have a separate public hearing on the same date and time.
DATE & TIME OF MEETING: Tuesday, September 5, 2023, 6:00 p.m.
LOCATION: City of National City, 1243 National City Blvd.
TO SUBMIT PUBLIC COMMENT:
Appear in person at the above-described meeting or submit your concerns in writing to the City Clerk at [email protected] before 4 PM on September 5, 2023. For more information, visit:
https://www.nationalcityca.gov/government/city-clerk/public-comments.
If you challenge the matter in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City Council at or prior to the public hearing. If you have special needs requiring assistance at the meeting, please call the City Clerk’s Office at (619) 336-4228 at least 24 hours prior to the meeting so that accommodations can be arranged.
Shelley Chapel, MMC, City Clerk