San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
3-95 October 2025
2021-285

Site remediation of the PSI property is a separate project with DTSC as the CEQA lead agency. Site remediation and the associated activities of that project are complete. Each project has independent utility. If the site remediation activity was not implemented, the Proposed Project would still be able to be developed at a reduced intensity. BNSF is the underlying property owner and is not the Project Applicant.

Response to Comment 7-10:

Comment 7-10 states the Draft EIR fails to adequately analyze the Project’s consistency with the City’s General Plan or the Health and Environmental Justice Element. The commenter also provides information on life expectancy in National City. This comment states the Project is inconsistent with Policies HEJ -1.2, HEJ-1.5, HEJ-2.1, HEJ-2.6, HEJ-2.7, HEJ-2.9, LU-3.2, LU3-.6, LU-3.7, S-7.7, S-8.1, CS-7.1, and C-2.6 as described below.

Health and Environmental Justice Element
Table 3.6-2 in Section 3.6 Land Use of the Draft EIR, titled Summary of Project Consistency with Environmental Policies of the General Plan and Other Applicable, provides a discussion of the Project’s applicability and consistency. As shown in the table, the Project is consistent with the applicable policies in the City’s Health and Environmental Justice Element. No changes to the Draft EIR are required in respons e to this comment.

Land Use Element
The consistency analysis provided in the Draft EIR includes analysis of applicable land use policies based upon the updated 2024 General Plan Land Use Element which was adopted by the City Council in March 2024. The analysis of compatible land uses is provided in Table 3.6-2 under Policy LU-6.2. No changes to the Draft EIR are required in response to this comment.

Safety Element
The consistency analysis provided in the Draft EIR includes analysis of applicable safety policies based upon the updated 2024 General Plan Land Use Element which was adopted by the City Council in March 2024. The analysis of consistency with soil contamination and contaminated sites is provided in Table 3.6- 2 under Policy S-7.7, S-8.1, and S-8.2. No changes to the Draft EIR are required in response to this comment.

Conservation and Sustainability Element
The Project proposes a new prefabricated unit that would be installed within the Project Site. Therefore, Energy Efficiency Standards for Residential and Nonresidential Buildings, as specified in Title 24, Part 6, of the CCR (Title 24) will be adhered to. Chapter 3.3 Energy of the Draft EIR accounts for electricity consumption of the office during the operational phase of the Project. No changes to the Draft EIR are required in response to this comment.

Circulation Element

Page 500 of 833 ends

Final
San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
3-96 October 2025
2021-285

The consistency analysis provided in the Draft EIR includes analysis of applicable transportation policies based upon the updated 2024 General Plan Transportation Element which was adopted by the City Council in February 2024. Policy C-2.6 no longer exists in the City’s adopted 2024 General Plan; however Table 3.6-2 demonstrates that the Proposed Project is consistent with all applicable policies identified in the Transportation Element.

Response to Comment 7-11:

Comment 7-11 states it is unclear whether the Proposed Project fits within any of the allowable land uses for industrial zones as listed in Table 18.25.020 of the City’s municipal code. The commenter states the Project does not meet requirements for a Conditional Use Permit (CUP) due to inconsistency with the LCP and impacts to wetlands and biological resources.

Please see Response to Comment 5-3. As described in Section 3.2 of the Draft EIR, there are no significant impacts to biological resources as a result of Project implementation. All potentially significant impacts include mitigation measures to reduce the impact to less than significant. No changes to the Draft EIR are required in response to this comment.

Response to Comment 7-12:

Comment 7-12 urges the City to require significant revisions to the EIR to ensure it adequately avoids, minimizes, and mitigates its significant impacts.

The City has fulfilled its obligation for environmental review under CEQA through preparation of the Draft EIR, including requirements for scoping and public review. As demonstrated through the analysis provided within the Draft EIR, impacts were found to be less than significant or less than significant with mitigation.

No further response is required.

Response to Comment 7-13:

This comment notes the DTSC demand letter to Pacific Steel Inc. (PSI) mentioned in Comment 7 -9 is attached to the comment letter. The letter states that DTSC determined PSI is still out of compliance with the Corrective Action Consent Agreement (CACA), Final Judgment, and Order on Consent and Stipulation for Entry of Final Judgment and Order. DTSC demands that PSI submit a Corrective Measures Study (CMS) Report with correct site boundaries.

As discussed in the letter, the Pacific Steel Site (Site) is comprised of three areas of property, including the North Parcel, South Parcel, and BNSF Parcel of which Pacific Steel owns the North Parcel and South Parcel but leases the BNSF Parcel from BNSF. The BNSF Parcel was leased to PSI for metal recycling facilities until approximately February 2023. BNSF entered into a Standard Voluntary Agreement (SVA) with DTSC on April 11, 2023, to remediate and facilitate redevelopment of its property.

BNSF conducted removal actions
in August 2023 in accordance with the Interim Measures Workplan (IMW), which resulted in the BNSF Parcels being able to meet the criteria for commercial/industrial uses as specified in the IMW, so long as

Page 501 of 833 ends

Final
San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
3-97 October 2025
2021-285

institutional controls, such as Land Use Covenant, were relied upon to restrict the land from residential uses.

The letter states that although removal actions were completed, the BNSF parcels remain as part of the PSI Site as defined in the CACA, Judgement and Stipulation, and DTSC-approved CMS Workplan and the work on the site does not relieve PSI of its liability for the Site. A revised CMS Report was requested to show the BNSF Parcels as part of the Site on the figures and figure legend. The revised report submitted to DTSC added the BNSF parcels to the figure legend but not the figures, leading DTSC to provide t his demand letter.

DTSC ‘s request is to update site boundaries in figures provided in the Corrective Measures Study (CMS) report and to specify that BNSF’s remediation efforts do not relieve PSI of its liability to the Site or change the Site boundaries. This is an administrative request to update an existing report and provides no challenge to the Draft EIR or the information contained therein. No further response is necessary.

Page 502 of 833 ends

Final
San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
4-1 October 2025
2021-285

4.0 ERRATA

4.1 Introduction
The following clarifications and modifications are intended to update the EIR. All of the information added pursuant to this Errata merely clarifies, corrects, adds to, or makes insignificant modifications to information in the EIR. The City has reviewed the information in this Errata and has determined that it does not change any of the basic findings or conclusions of the EIR, does not constitute “significant new information” pursuant to CEQA Guidelines Section 15088.5, and does not require recirculation of the Draft EIR.

For clarification and correction, strikeout/underline has been used to identify changes in the Draft EIR when compared to the Final EIR. Changes to the text are noted with underline type for added text and strikeout type for deleted text.

4.2 Project Clarification
Table 3.1-6 Operational Criteria Air Pollutant Emissions on pages 3.1-20 and 3.1-21 of the Draft EIR presents Project-related operational emissions compared to SDAPCD significance daily and annual thresholds. For Mainline Rail Emissions, the pounds per day emissions for summer and winter and tons per year emissions were presented in the wrong column and assigned to the incorrect pollutant for ROG, CO, and SO2. The emission values do not change; they are merely presented in the incorrect column. This clarification is only for the Mainline Rail Emissions and the total Project operational emissions are updated for clarification. Emission values for NOX, PM10, and PM2.5 are correctly identified in the table.

Table 3.1-6. Operational Criteria Air Pollutant Emissions Emission Source
Pollutant
ROG NOX CO SO2 PM10 PM2.5
Summer Emissions (Pounds per Day)
CalEEMod Sources
(area sources, worker commutes and
truck trips)

0.34 9.23 4.39 0.06 1.87 0.57
Calculated Fugitive Evaporation
(fuel transfer off-gassing) 32.27 -- -- – – –
Mainline SDAB Rail Emissions
(65 miles of transport per train trip) 7.67 1.96 31.24 5.97

7.67 1.96 5.97 1.09 1.00
Project Emissions 40.28

34.57 40.47 10.36

12.06 2.02 6.03 2.96 1.57

Page 503 of 833 ends

Final
San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
4-2 October 2025
2021-285

Table 3.1-6. Operational Criteria Air Pollutant Emissions Emission Source
Pollutant
ROG NOX CO SO2 PM10 PM2.5
Winter Emissions (Pounds per Day)
CalEEMod Sources
(area sources, worker commutes and
truck trips)

0.26 9.58 4.39 0.06 1.87 0.57
Calculated Fugitive Evaporation
(fuel transfer off-gassing) 32.27 -- -- – – –
Mainline SDAB Rail Emissions
(65 miles of transport per train trip 7.67 1.96 31.24 5.97

7.67 1.96 5.97 1.09 1.00
Project Emissions 40.20

34.49 40.82 10.36

12.06 2.02 6.03 2.96 1.57
Daily Significance Threshold 75 250 550 250 100 55
Exceed Daily Threshold? No No No No No No
Annual Emissions (Tons per Year)
CalEEMod Sources
(area sources, worker commutes and
truck trips)

0.1 1.7 0.8 0.0 0.3 0.1
Calculated Fugitive Evaporation
(fuel transfer off-gassing) 5.9 -- -- -- -- --
Mainline SDAB Rail Emissions
(65 miles of transport per train trip 1.4 0.4 5.7 1.1 1.4 0.4 1.1 0.2 0.2 Project Emissions 7.4 6.4 7.4 1.9 2.2 0.4 1.1 0.5 0.3
Annual Significance Threshold 13.7 40 100 40 15 10
Exceed Annual Threshold? No No No No No No
Notes: US Compliance calculated the operational emissions for the Proposed Project fugitive VOC/ROG emissions. Trip counts and distances were calculated based on the Project’s daily throughput, truck tanker capacity, and trip distances provided by US C ompliance.

In addition, mainline rail emissions were calculated using the BNSF ton- mile per gallon, Project throughput, BNSF engine inventory and CARB Vision Access Database emission factors in grams per gallon diesel.

Source: CalEEMod version 2022.1. Refer to Appendix B for Model Data Outputs.

Page 504 of 833 ends

Final
San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-3 October 2025
2021-285

5.0 MITIGATION MONITORING AND REPORTING PLAN

5.1 Introduction
In accordance with CEQA, an EIR that identified adverse impacts related to the construction activity for the Proposed Project was prepared. The EIR identified mitigation measures that would reduce or eliminate these impacts to below the level of significance.

Section 21081.6 of the Public Resources Code and Sections 15091(d) and 15097 of the State CEQA Guidelines require public agencies to adopt a reporting and monitoring plan for changes to the p roject which it has adopted or made a condition of project approval in order to mitigate or avoid significant effects on the environment. A Mitigation Monitoring and Reporting Plan (MMRP) is required for the Proposed Project because the EIR identified potentially significant adverse impacts related to construction and operation activities, and mitigation measures have been identified to mitigate these impacts.

Adoption of the MMRP will occur along with approval of the Proposed Project.

5.2 Purpose of the Mitigation Monitoring and Reporting Plan This MMRP has been prepared to ensure that all required mitigation measures are implemented and completed according to schedule and maintained in a satisfactory manner during the construction and operation of the Proposed Project, as required. The MMRP may be modified during project implementation, as necessary, in response to changing conditions or other project refinements. Tab le 5-1 has been prepared to assist the responsible parties in implementing the MMRP. This table identifies the category of significant environmental impact(s), individual mitigation measures, monitoring and mitigation timing, responsible person/agency for implementing the measure, monitoring and reporting procedure, and notation space to confirm implementation of the mitigation measu res. The numbering of the mitigation measures follows the numbering sequence in the EIR.

5.3 Roles and Responsibilities
The City of National City, as Lead Agency, is responsible for oversight of compliance of the mitigation measures in the MMRP.

5.4 Mitigation Monitoring and Reporting Plan
The column categories identified in the MMRP table (Table 5-1) are described below. • Mitigation Measure – This column lists the mitigation measures by number.

Page 505 of 833 ends

Final
San Diego Clean Fuels Facility LLC Project
Environmental Impact Report
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-4 October 2025
2021-285

• Monitoring Activity/Timing/Frequency/Schedule – This column lists the activity to be monitored for each mitigation measure, the timing of each activity, and the frequency/schedule of monitoring for each activity.

• Implementation Responsibility/Verification – This column identifies the entity responsible for complying with the requirements of the mitigation measure and provides space for verification initials and date.
• Responsibility for Oversight of Compliance/Verification – This column provides the agency responsible for oversight of the mitigation implementation and is to be dated and initialed by the agency representative based on the documentation provided by the construction contractor or through personal verification by agency staff.
• Outside Agency Coordination – This column lists any agencies with which the City may coordinate for implementation of the mitigation measure. • Comments – This column provides space for written comments, if necessary.

Page 506 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-5 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
Biological Resources Mitigation Measures
BIO-1: Rare Plant Salvage. Prior to the start of construction activities, a qualified biologist shall salvage seed from the Nuttall’s acmispon during the appropriate time of year (June to October), store under appropriate conditions, and coordinate donation of the seeds with a refuge and/or plant nursery (e.g., Sweetwater Marsh National Wildlife Refuge and Native West Nursery) that would apply seed within the refuge boundaries.

Appropriate seed storage conditions are in a paper bag, placed in a dry location out of direct sunlight, away from moisture, ideally at 72 degrees Fahrenheit. Seed shall be collected from June to October 2024 and the subsequent spring (2025),
provided that the plant is present and ready to seed.

Activity:

Seed salvage

Timing:

Prior to the start of
construction activities.

Frequency:
2 collection seasons.

Project Biologist

Initials

Date

City of National
City

Initials

Date

Possible
coordination with
USFWS.

Seeds collected
in July 2022
and donated in
October 2022.

BIO-2: Pre-Construction Survey for Nesting Birds and
Special-Status Avian Species. Where feasible, ground-
disturbing activities, including vegetation removal, shall be conducted during the non-breeding season (approximately September 1 through January 14) to avoid violations of the MBTA and California Fish and Game Code Sections 3503, 3503.5 and 3513. Several species were identified as having potential to nest year-round; therefore, regardless of time of year, a pre- construction survey for nesting birds and special-status avian species shall be conducted by a qualified biologist (experienced in the identification of avian species and conducting nesting bird Activity:

Pre-construction
survey for nesting
birds and special-
status avian species.

Timing:

Conduct survey no
more than three days
prior to initial ground
disturbance if
Project Biologist

Initials

Date

City of National
City

Initials

Date

Possible
coordination with
CDFW.

Page 507 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-6 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
surveys) if activities with the potential to disrupt nesting birds or special-status avian species are scheduled to occur. The survey shall include the Proposed Project and adjacent areas where Project activities have the potential to cause nest failure. The pre-construction survey shall be conducted no more than 3 days prior to the start of ground-disturbing activities (including vegetation removal) within the bird breeding season. Site preparation and construction activities may begin if no nesting birds or special-status avian species are observed during the survey. If nesting birds or raptors or special-status avian species are found to be present, avoidance or minimization measures shall be implemented to avoid potential proposed Project- related impacts to the species. Avoidance and minimization measures shall be developed by the qualified biologist and may include seasonal work restrictions, additional survey and monitoring requirements, or non-disturbance buffers established around active nests until the biologist has determined that the nesting cycle is completed. The width of non-disturbance buffers established around active nests will be determined by the qualified biologist (300 feet is typically recommended for songbirds and 500 feet is typically recommended for raptors).

Once nesting is deemed complete by the qualified biologist as determined through periodic nest monitoring, the non-
disturbance buffer will be removed by the qualified biologist and proposed Project work may resume in the area.

construction is to
occur during breeding
season.

Frequency:

One time.

Page 508 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-7 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
BIO-3: Compliance with Section 4150 of California Fish and Game Code: If tree trimming and removal activities are required, these activities should take place outside of the bat maternity season (April 1 to August 31) to the greatest extent feasible. If tree removal must take place during the maternity season, a pre- removal bat survey shall take place no more than 48 hours prior to planned tree removal to determine if bats are roosting in the trees. If bats are determined to be present in the trees during surveys, tree removal shall be postponed until after the maternity season (September 1 through March 31). All tree-trimming and removal activities shall be conducted under the direct
supervision of a qualified bat biologist.

To minimize direct mortality to any roosting bats, including western yellow bat, each palm tree requiring removal shall be trimmed using a two-step process conducted over two
consecutive days. On the first day only the outermost fronds of each individual tree shall be removed, including the uppermost live fronds (the top of the tree) entirely on the first day along with the upper 25 percent of the frond skirt. The innermost fronds shall not be trimmed. No more than 50 percent of the palm fronds shall be removed from each tree during Day 1. This method would allow for sufficient disturbance of the tree that would encourage any roosting bats within the frond skirt to abandon the tree during evening emergence without directly impacting roosting bats within the skirt. The remainder of the tree should be removed on the second day. This procedure need Activity:

Tree trimming and
removal; Bat survey.

Timing:

Outside bat maternity
season. Bat survey no
more than 48 hours
prior to tree removal.

Frequency:

As needed.

Project Biologist

Initials

Date

City of National
City

Initials

Date

Page 509 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-8 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
not be implemented if the tree does not have fronds. All fronds must be removed/trimmed using chainsaws or other hand-tools.

No use of heavy equipment shall be used to remove fronds.

If bats emerge at any time during the tree trimming, trimming activities shall cease at that individual tree for the remainder of the day to allow for any additional bats roosting in the tree to emerge during evening hours when it is safe and appropriate for them to do so. Trimming of the tree may resume the following morning.

Tree trimming activities in the fall should be conducted on days when weather conditions are such that roosting bats are unlikely to be in torpor (predicted overnight lows on evenings before and after the tree trimming activities are above 45 degrees Fahrenheit) to the extent practicable.

Greenhouse Gas Mitigation Measures
GHG-1: Adhere to National City’s Climate Action Planning Reduction Measures. The Project shall implement the following applicable greenhouse gas-reducing measures, consistent with National City Climate Action Plan Update:
 Prior to issuance of a building permit, the Applicant shall demonstrate that the employee parking lot is electric
vehicle ready (i.e., charging stations, preferred parking, etc.).

Activity:

GHG reduction
measures.

Timing:

Prior to the issuance of
occupancy permits.

Frequency:

As needed.

Applicant

Initials

Date

City of National
City

Initials

Date

Page 510 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-9 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
 Limit idling times for all employee and tanker truck
vehicles, as well as construction equipment, to less than 5 minutes.
 Prior to issuance of a building permit, the Applicant shall demonstrate implementation of all applicable
Nonresidential Voluntary Measures of the California Green Building Standards Code – Part 11, Title 24, California Code of Regulations (CalGreen) from the Planning and
Design, Energy Efficiency, Water Efficiency and
Conservation, and Material Conservation and Resource
Efficiency Divisions (Appendix A5 of the 2022 California Green Building Standards Code). These measures shall
include, but are not limited to, energy efficiency
enhancements, water use reduction, sustainable building materials, improved indoor environmental quality, and
waste management strategies.

Tribal Cultural Resources Mitigation Measures

Page 511 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-10 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
CUL-1: Archaeological Monitoring. A qualified professional archaeologist, meeting or working under the direction of someone meeting the Secretary of the Interior’s Professional Qualifications Standards for prehistoric and historic archaeology should be retained to monitor all ground-disturbing activities associated with Project construction, including vegetation removal, clearing, grading, trenching, excavation, or other activities that will disturb original (pre-project) ground. The monitor must have the authority to temporarily pause activity at the location in the event of an unanticipated discovery, so that he or she can direct the procedures in section 6.3.3.

Activity:

Archaeological
Monitoring.

Timing:

During ground-
disturbing activities.

Frequency:

As needed.

Qualified
Archaeologist

Initials

Date

City of National
City

Initials

Date

CUL-2: Native American Monitoring. A Native American
monitor from a tribe that is traditionally and culturally affiliated with the Project Area should be retained to monitor all ground- disturbing activities associated with Project construction, including vegetation removal, clearing, grading, trenching, excavation, or other activities that will disturb original (pre- project) ground. The Native American monitor should have the authority to temporarily pause activity at the location in the event of an unanticipated discovery, so that he or she can coordinate with the Project archaeologist on the identification of a potential cultural resource and the Project archaeologist can direct the procedures in the following section.

Activity:

Tribal Cultural
Resource Monitoring.

Timing:

During ground-
disturbing activities.

Frequency:

As needed.

Native American
Monitor

Initials

Date

City of National
City

Initials

Date

Page 512 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-11 March 2025
2021-285

CUL-3: Post-Review Discovery Procedures. If subsurface
deposits believed to be cultural or human in origin are discovered during construction, all work must halt within a 100- foot radius of the discovery. A qualified professional
archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for pre-contact and historic archaeology, shall be retained to evaluate the significance of the find, and shall have the authority to modify the no-work radius as appropriate, using professional judgment. The following notifications shall apply, depending on the nature of the find:
 If the professional archaeologist determines that the find does not represent a cultural resource, work may resume immediately, and no agency notifications are required.
 If the professional archaeologist determines that the find does represent a cultural resource from any time period or cultural affiliation, he or she shall immediately notify the City, and applicable landowner. The agencies shall consult on a finding of eligibility and implement appropriate
treatment measures if the find is determined to be a
Historical Resource under CEQA, as defined in Section
15064.5(a) of the CEQA Guidelines, or a Historic Property, as defined in 36 CFR 60.4. Work may not resume within
the no-work radius until the lead agencies, through
consultation as appropriate, determine that the site either:
1) is not a Historical Resource under CEQA or Section 106; or 2) that the treatment measures have been completed
to their satisfaction.
 If the find includes human remains, or remains that are potentially human, he or she shall ensure reasonable
protection measures are taken to protect the discovery
from disturbance (AB 2641). The archaeologist shall notify the San Diego County Medical Examiner (per § 7050.5 of
Activity:

Resource evaluation.

Timing:

During construction.

Frequency:

As needed.

Qualified
Archaeologist

Initials

Date

City of National
City

Initials

Date

Page 513 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
5-12 March 2025
2021-285

Table 5-1. Mitigation Monitoring and Reporting Plan.

Mitigation Measure Activity/Timing/
Frequency
Implementation
Responsibility/
Verification
Responsibility
for Oversight of
Compliance/
Verification
Outside Agency
Coordination Comments
the Health and Safety Code). The provisions of § 7050.5 of the California Health and Safety Code, § 5097.98 of the California PRC, and AB 2641 will be implemented. If the Medical Examiner determines the remains are Native
American and not the result of a crime scene, the Medical Examiner will notify the NAHC, which then will designate a Native American Most Likely Descendent (MLD) for the
Project (§ 5097.98 of the PRC). The designated MLD will have 48 hours from the time access to the property is
granted to make recommendations concerning treatment
of the remains. If the landowner does not agree with the recommendations of the MLD, the NAHC may mediate (§
5097.94 of the PRC). If no agreement is reached, the
landowner must rebury the remains where they will not be further disturbed (§ 5097.98 of the PRC). This will also include either recording the site with the NAHC or the
appropriate Information Center; using an open space or
conservation zoning designation or easement; or
recording a reinternment document with the county in
which the property is located (AB 2641). Work may not
resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the treatment measures have been completed to their
satisfaction.

Page 514 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project
ECORP Consulting, Inc.

San Diego Clean Fuels Facility LLC Project
6-1 January 2025
2021-285

6.0 LIST OF APPENDICES
Appendix A –San Diego Clean Fuels Facility LLC Project Draft EIR (November 2024)

Page 515 of 833 ends

Final Initial Study and Mitigated Negative Declaration
San Diego Clean Fuels Facility, LLC Project

APPENDIX A
San Diego Clean Fuels Facility LLC Project Draft EIR (November 2024)

Page 516 of 833 ends

RESOLUTION NO. 2025-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIO NAL CITY,

CALIFORNIA, CERTIFYING A FINAL ENVIRONMENTAL IMPACT REPORT FOR A

PROPOSED FUEL TRANSFER FACILITY (SAN DIEGO CLEAN FUELS LLC) WITHIN BNSF

RAILROAD RIGHT-OF-WAY AND BNSF-OWNED PROPERTY, LOCATED WEST OF THE 1800 BLOCK OF CLEVELAND AVENUE AND NORTH OF WEST 19TH STREET, NORTH TO CIVIC CENTER DRIVE.

WHEREAS, the Planning Commission of the City of National City considered the Final Environmental Impact Report for an application for a proposed fuel transfer facility within BNSF railroad right-of-way and BNSF -owned property, located west of the 1800 block of Cleveland Avenue and north of West 19th Street, north to Civic Center Drive at a duly advertised public hearing held on September 15 , 202 5, at which time the Planning Commission considered evidence; and

WHEREAS, at said public hearing the Planning Commission considered the staff report provided for Case File No. 2023-03 IS, which is maintained by the City and incorporated herein by reference; along with any other evidence presented at said hearing and voted to adopt Resolution No. 2025-13 by a unaminous vote of those present; and

WHEREAS, the City Council of the City of National City considered the appeal of the Planning Commission’s denial of the Conditional Use Permit and Coastal Development Permit for the aforementioned project for a proposed fuel transfer facility at duly advertised public hearings held on October 7, 2025 and November 4, 2025, at which time oral and documentary evidence was presented; and

WHEREAS, at said public hearings the City Council considered the staff report provided for Case File No. 2023-03 IS maintained by the City and incorporated herein by reference along with evidence and testimony at said hearing; and

WHEREAS, this action is taken pursuant to all applicable procedures required by State law and consistent with City ordinances and regulations; and

WHEREAS, the action hereby taken is found to be essential for the preservation of the public health, safety and general welfare.

NOW, THEREFORE, THE CITY COUNCIL OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

Section 1: That th e City Council hereby certifiies the Final Environmental Impact Report for a proposed fuel transfer facility within BNSF railroad right-of-way and BNSF-owned

Page 517 of 833 ends

property, located west of the 1800 block of Cleveland Avenue and north of West 19th Street, north to Civic Center Drive, based on the following findings:

1. Pursuant to CEQA Guideli nes Sections 15050 and 15051, the City is the “lead agency” for the project.

2. The Draft EIR and Final EIR were prepared in compliance with CEQA, CEQA Guidelines, and any City Significance Determination Thresholds.

3. The Final EIR for the San Diego Clean Fuels Facility LLC Project reflects the City ’s independent judgment and analysis in accordance with PRC Section 20182.1 (c) (3) and CEQA Guidelines section 15090(a) in reviewing, commenting on, and revising material prepared by the consultant.

4. An MMRP has b een prepared for the project, which the City has adopted and has made a condition of approval of the project. That MMRP is incorporated herein by reference and is considered part of the Record of Proceedings for the project.

5. With the certification of the EIR, the City Council adopts all mitigation measures recommended by the EIR as listed in the Mitigation Monitoring and Reporting Program

6. The MMRP designates responsibility and anticipated timing for the implementation of mitigation measures. The City will serve as the MMRP Coordinator.

7. In determining whether the project has a significant impact on the environment, and in adopting these Findings pursuant to Section 21081 of CEQA, the City has based its decision on substantial evidence in the record and has complied with CEQA Sections 21081.5 and 21082.2 and CEQA Guidelines Section 15901(b).

8. The impacts of the project have been analyzed to the extent feasible at the time of certification of the Final EIR.

9. The City Council finds that the Proposed Project would not conflict with air quality plans or expose sensitive receptors to harmful pollutant levels, and impacts would be less than significant. Therefore, no mitigation is required.

10. The City Council finds that the Proposed Project would have less than si gnificant effects related to wasteful, inefficient, or unnecessary energy consumption during construction and is consistent with applicable state and locals plans for renewable energy and energy efficiency.

11. The City Council finds that changes or alteratio ns have been required in, or incorporated into, the Proposed Project which would mitigate or avoid the significant environmental effects identified in the EIR.

12. The City Council finds that Project implementation would not conflict with applicable environmental policies of the City’s General Plan and/or State and federal laws, regulations and orders, and that impacts would be less than significant, and no mitigation is required.

Page 518 of 833 ends

13. The City Council finds that the Proposed Project would not physically divide an established community and would not conflict with applicable environmental policies of the City’s General Plan, and/or local plans, and/or State and federal laws, regulations and orders. Impacts would be less than significant, and no mitigation is required.

14. The City Council finds that the Proposed Project would not conflict with any of the applicable plans, programs, or ordinances, or policies addressing the circulation system. The Project is consistent with the City’s General Plan and does not exceed the average daily trip (ADT) threshold and would not have a significant vehicle miles traveled (VMT) impact. Impacts would be less than significant.

15. The City Council finds that changes or alterations have been required in, or incorporated into, the Proposed Project which would mitigate or avoid the significant environmental effects to Special Status Plant and Wildlife Species identified in the EIR.

16. The City Council finds that changes or alterations have been required in, or incorporated into, the Proposed Project which would mitigate or avoid the significant environmental effects to Tribal Cultural Resources identified in the EIR.

17. The City reviewed the comments received on the Draft EIR and the responses thereto and has determined that neither the comments received nor the responses to such comments add significant new information regarding environmental impacts associated with the project. The City has based its actions on full appraisal of all viewpoints, including all comments received up to the date of a doption of these Findings concerning the environmental impacts identified and analyzed in the Final EIR.

a. The responses to comments on the Draft EIR, which are contained in the Final EIR, clarify and amplify the analysis in the Draft EIR.

18. The City has ma de no decisions that constitute an irretrievable commitment of resources toward the project prior to certification of the Final EIR, nor has the City previously committed to a definite course of action with respect to the project.

19. Copies of all the docume nts incorporated by reference in the Draft EIR and/or Final EIR are and have been available upon request at all times at the offices of the City, custodian of record for such documents or other materials.

20. Having received, reviewed, and considered all info rmation and documents in the record, the City hereby conditions the project and finds as stated in these Findings.

Section 2: That the City Council has considered the proposed Environmental Impact Report No. 2023-03 IS, together with any comments received during the public review process, and finds on the basis of the whole record that there is no substantial evidence that the project will have a significant effect on the environment after incorporation of fully enforceable mitigation measures and that the Environmental Impact Report reflects the City’s independent judgment and analysis, and hereby certifies the Environmental Impact Report, including the Mitigation Monitoring and Reporting Program, and authorizes the filing of a Notice of Determination:

Page 519 of 833 ends

Indemnification Agreement
The Applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney's fees, against the City or it s agents, officers, or employees, relating to the issuance of this permit including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval and any environmental document or decision. The City will promptly notify the Applicant of any claim, action, or proceeding. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification. In the event of such election, the Applicant shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and Applicant regarding litigation issues, the City shall have the authority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition of the matter. However, the Applicant shall not be required to pay or perform any settlement unless such settlement is approved by the Applicant.

Section 3: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.

PASSED and ADOPTED this 4th day of November, 2025.
__________________________
Ron Morrison, Mayor

ATTEST:
_____________________________
Shelley Chapel, MMC, City Clerk
APPROVED AS TO FORM:
_____________________________
Barry J. Schultz, City Attorney

Page 520 of 833 ends

RESOLUTION NO. 2025-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA,

APPROVING A CONDITIONAL USE PERMIT AND COASTAL DEVELOPMENT PERMIT FOR

A PROPOSED FUEL TRANSFER FACILITY (SAN DIEGO CLEAN FUELS LLC) WITHIN

BNSF RAILROAD RIGHT -OF-WAY AND BNSF -OWNED PROPERTY, LOCATED WEST OF THE 1800 BLOCK OF CLEVELAND AVENUE AND NORTH OF WEST 19TH STREET, NORTH TO CIVIC CENTER DRIVE.

WHEREAS, the Planning Commission of the City of National City considered a Conditional Use Permit and Coastal D evelopment Permit for a proposed fuel transfer facility within BNSF railroad right-of-way and BNSF-owned property, located west of the 1800 block of Cleveland Avenue and north of West 19th Street, north to Civic Center Drive at a duly advertised public hea ring held on September 15, 2025, at which time the Commission denied the Conditional Use Permit and Coastal Development Permit; and

WHEREAS, subsequent to the Planning Commission denial of the Conditional Use Permit and Coastal Development Permit , the app licant (“APPELLANT”) appealed the decision of the Planning to the City Council; and

WHEREAS, the City Council of the City of National City considered the appeal of the Planning Commission’s denial of the Conditional Use Permit and Coastal Development Perm it at duly advertised public hearing s held on October 7 , 2025 and November 4, 2025 , at which time oral and documentary evidence was presented; and

WHEREAS, at said public hearing s the City Council considered the staff report contained in Case File No. 20 23-03 CUP, CDP maintained by the City and incorporated herein by reference along with evidence and testimony at said hearing; and

WHEREAS, this action is taken pursuant to all applicable procedures required by State law and City law; and

WHEREAS, the action hereby taken is found to be essential for the preservation of the public health, safety and general welfare.

NOW, THEREFORE, THE CITY COUNCIL OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

Section 1: That t he City Council hereby upholds the appellants’ appeal of and overturns the Planning Commission’s decision to deny the Conditional Use Permit and Coastal Development Permit No. 2023-03 CUP, CDP for a proposed fuel transfer facility within BNSF railroad righ t-of-way and BNSF -owned property, located west of the 1800 block of Cleveland Avenue and north of West 19th Street, north to Civic Center Drive , based on the following findings:

Page 521 of 833 ends

FINDINGS FOR APPROVAL

OF THE CONDITIONAL USE PERMIT

1. The site for the propose d use is adequate in size and shape because the project is proposed for an approximately 7.5 -acre site comprised of railroad right -of-way and adjacent property owned by BNSF railway. While the site exceeds the minimum lot area of 5,000 square feet for the Medium Manufacturing (MM) zone, only one small office structure is proposed with the majority of the site being occupied by new railways, pumping equipment to transfer fuel, and an appropriately -size paved service to allow for the ingress and egress of trucks. All proposed improvements adhere to minimum setback and site design requirements.

2. The site has sufficient access to streets and highways that are adequate in width and pavement type to carry the quantity and quality of traffic generated by the propos ed use because the project location is on the west side of the City where adequate truck routes exist along Bay Marina Drive, Civic Center Drive, and Tidelands Avenue. Interstate 5 is directly accessible from these streets. In addition, the site has access from West 18th and West 19th Streets for ingress and egress of truck traffic. As a condition of approval, the West 18th Street right -of-way is required to be improved to the satisfaction of the City Engineer. A traffic impact study was completed for the p roposed project and the trip generation of the proposed use was determined to be minimal.

3. The proposed use will not have an adverse effect upon adjacent or abutting properties because the proposed project is an industrial use consistent with the Medium Manufacturing (MM) zone description in the General Plan and will be subject to conditions of approval that ensure safe operation of the facility. Adjacent and abutting properties are occupied by similar industrial and manufacturing uses. As a condition of ap proval, the project is required to include a screening wall or fence and enhanced landscaping to reduce visual impacts. The project is also required to conform to all development standards and design guidelines of the MM zone, as well as all the requiremen ts of the Mitigation Monitoring and Reporting Program developed for this Project and incorporated as conditions in the CUP.

4. The proposed use is deemed essential and desirable to the public convenience or welfare because the project proposes to further advance State goals to reduce the carbon-based emissions in the transportation sector. The proposed fuel transfer facility will bring approximately 13,800 barrels of biofuels to the regional market daily. Renewable biofuels can contribute to up to an 80% decr ease in emissions from standard diesel fuel. The public will benefit from access to a cleaner-burning fuel as well as increased air quality and a reduction of GHG emissions. The use is consistent with the MM zone description, which is intended for uses in areas in which activities involve some degree of noise, vibration, air pollution, radiation, glare phenomena, and/or fire and explosive hazards. In addition, the project proponent will enter into an economic benefit agreement with the City that will

Page 522 of 833 ends

generate funds for the purpose of reducing emissions and improving the quality of life for residents.

FINDINGS FOR APPROVAL

OF THE COASTAL DEVELOPMENT PERMIT

1. The granting of said Coastal Development Permit will be consistent with all other plans and ordinances of the City of National City because the proposed use is permitted, subject to a CUP, by the Land Use Code, which is consistent with the General Plan. As discussed in the staff report, several policies in the Land Use, Transportation, Safety, Noise and Nuisance, Open Space and Agriculture, and Conservation and Sustainability Elements of the General Plan are being met by the project. The project, subject to the condition of approval related to the establishment of an economic development agreement, is consistent with the policies of the Health and Environmental Justice Element because the additional funds can be used for the implementation of policies and programs to reduce emissions and improve the welfare of residents in the vicinity of the project area. T he proposed economic benefit can also be used to further the goals of the AB 617 Portside Community’s Community Emissions Reduction Plan (CERP). The project, subject to the approved mitigation measures requiring conformance with specific Climate Action Pla n (CAP) policies, is also consistent with the CAP Update.

2. The granting of said Coastal Development Permit will be consistent with and implements the Certified Local Coastal Program because the project is located in an area generally exempt from a Coastal Development Permit; involves a fuel storage and distribution use, which is conditionally allowed in the MM zone; and will not prohibit coastal access or obstruct views.

Section 2: That the City Council hereby approves the application for Conditional Use Permit and Coastal Development Permit subject to the following conditions:

General

1. This Conditional Use Permit and Coastal Development Permit authorizes the construction and operation of a fuel transfer facility . Except as req uired by Conditions of Approv al, all plans submitted for permits associated with this project shall conform to Exhibit A, Case File No. 2023-03 CUP, CDP, IS, dated 2/15/2024.

2. This Conditional Use Permit and Coastal Development Permit shall not become effective until the Environmental Impact Report associated with the project has been certified and the Notice of Determination filed with the CEQA State Clearinghouse, and all required appeals have been exhausted.

3. Before this Conditional Use Permit and Coastal Development Permit shall become effective, the applicant and the property owner shall both sign and have notarized an Acceptance Form, provided by the Planning Division, acknowledging and accepting all conditions imposed upon the approval of this permit. Failure to return the signed and notarized Acceptance Form within

Page 523 of 833 ends

30 days of its receipt shall automatically terminate the Conditional Use Permit and Coastal Development Permit. The applicant or owner shall also submit evidence to the satisfaction of the Planning Division that a Notice of Restriction on Real Property is recorded with the County Recorder. The applicant or owner shall pay necessary recording fees to the County. The Notice of Restriction shall provide information that conditions imposed by appr oval of the Conditional Use Permit and Coastal Development Permit are binding on all present or future interest holders or estate holders of the property. The Notice of Restriction shall be approved as to form by the City Attorney and signed by the Director of Community Development prior to recordation.

4. Within four (4) days of approval , pursuant to Fish and Game Code 711.4 and the California Code of Regulations, Title 14, Section 753.5, the applicant shall pay all necessary environmental filing fees for the San Diego County Clerk. Che cks shall be made payable to the San Diego County Clerk and submitted to the National City Planning Division. The fee is currently $4,123.50, although it may be different at time of filing.

5. This permit shall expire if the use a uthorized by this resolution is discontinued for a period of 12 months or longer. This permit may also be revoked, pursuant to provisions of the Land Use Code, if discontinued for any lesser period of time.

6. This Conditional Use Permit and Coastal Development Permit may be revoked if the operator is found in violation of any Conditions of Approval or applicable law. The property, the use and the permittee shall comply with all applicable law at all times.

7. Should either the Conditional Use Permit or Coastal D evelopment Permit expire or b e revoked, operations of the authorized use shall cease immediately.

Building

8. All plans submitted for improvements must comply with the current editions of the California Building, Electrical, Plumbing, Mechanical, and Fire Codes.

Coastal Development Permit – Special Conditions

9. Expiration. Except as otherwise provided in this special condition, this Coastal Development Permit (CDP) shall expire 30 years from the date of approval. By acceptance of this CDP, the Permittee acknowledges and agrees that the project authorized pursuant to this CDP is thus interim and temporary, and is permitted for the time frame identified in order to provide a reasonable period of time for the Permittee to evaluate future risk of coastal hazards as influenced by sea level rise a nd plan, develop, and implement any necessary responses to coastal hazards including adaptation or relocation alternatives, to ensure minimization of risk in the long term, or to address any coastal resource impacts associated with maintaining the subject development at this location.

At least six months prior to the expiration of the authorization period, the Permittee or its successors shall submit an application for a CDP amendment to either (a) modify the expiration date of this CDP and modify its design, as needed, to ensure consistency with the Coastal Act, or (b) relocate or remove all or portions of the project and restore the affected areas to pre-development conditions or better. If a complete CDP amendment applicatio n is filed prior to the CDP expiration date, the authorization period shall be automatically extended

Page 524 of 833 ends

until the time the City acts on the application. The required amendment application shall conform to the City’s permit filing regulations at the time and shall reflect the approach(es) identified in the Coastal Hazards Adaptation and Implementation Plan (see Special Condition 10), as well as any necessary updates to reflect the site conditions and regional sea level rise planning approaches at the time of the amendment.

10. Coastal Hazard A daptation and Implementation Plan . The permittee shall submit for review and approval a Coastal Hazards Adaptation and Implementation Plan (CHAIP) at the same time as the CDP amendment required pursuant to Special Condition 9 or at the same time as any fut ure application for modifications to the development authorized by this CDP, whichever comes first. The CHAIP shall identify a suite of strategies necessary for protecting, relocating, or otherwise adapting the development authorized by 2023-03 CDP as necessary to maintain safety from flooding and other coastal hazards in order to minimize risk and assure stability and structural integrity and to ensure protection of coastal resources over the long-term (at least through 2125). The CHAIP shall reflect the ongoing long-term sea level rise adaptation planning efforts by the City, the Port of San Diego, and other relevant asset managers and stakeholders. The CHAIP shall include/address the following:
a. An analysis of current and fut ure coastal hazards that may i mpact the development authorized in this CDP, including flood hazards caused by tidal inundation, extreme tides and storms, overtopping of seawalls/dikes/levees, and elevated groundwater and/or reduced or inadequate drainage, which takes into account local sea level rise through at least 2125, considering intermediate-high and high SLR scenarios, and based on the best available science at the time of plan preparation.
b. An evaluation of alternatives to the development authorized in this CDP to address any coastal hazard vulnerabilities identified, including but not limited to alternatives involving accommodation strategies (e.g., floodproofing), protection measures, and retreat and relocation strategies (including retreat and relocation of all or portions of the development).

The evaluation shall describe the specific design elements and adaptation measures, including how different strategies may be used in combination and over time to ensure the integrity and functionality of the project and protection of coas tal resources. The information concerning these alternatives must be sufficiently detailed to enable the City to evaluate the feasibility of each alternative for addressing consistency with the Coastal Act, including whether the alternatives minimize risks of geologic and flood hazards and ensure protection of coastal resources. The evaluation shall include a feasibility analysis of the alternatives that assesses and considers all potential constraints, including geotechnical and engineering constraints, regulatory requirements, project costs, and potential funding options. The identified adaptation strategies and overall long-term approach shall be the least-environmentally damaging feasible alternative
Engineering

11. A Grading and Improvement plan shall be required to be submitted to the National City Public Works Department.

12. The following items are required to be submitted at the time the grading plans are submitted:
a. A soils report.

Page 525 of 833 ends

b. Hydrology study.
c. Hydro modification report or a letter from the engineer of w ork detailing why a hydro modification is not required.
d. An engineer’s cost estimate.
e. Two copies of calculations for any retaining walls.
f. A copy of calculations for any other underground structure. g. Completed Storm Water BMP Ap plicability Checklist located a t this link:
https://www.nationalcityca.gov/home/showpublisheddocument/13794/6362879382258000

00. h. A completed copy of the “Ap plication for Grading or Constr uction” located at this link:
https://www.nationalcityca.gov/home/showpublisheddocument/12543/6360906271691300

00. 13. The plans shall be drawn by a registered civil engineer licensed in the State of California.

14. The plans shall be drawn on National City standard border with National City standard title block and standard notes.

15. The plans shall be drawn on standard “D” size sheets.

16. Bonding in the amount of 100% of the engineer’s cost estimate is required.

17. A Storm Water BMP Maintenance Agreement shall be required.

18. Landscaped plans shall be included with the grading and improvement plans.

19. No work shall commence until a grading permit ha s been issued by the City of Na tional City and a preconstruction meeting held with the Senior Construction Inspector.

20. All work performed shall comply with all State and local requirements and the requirements of the Department of Toxic Substance Control.

21. Sidewalk shall be installed along the southerly side of West 18th Street from the westerly end of West 18th Street to the alley which runs from West 18th Street to West 19th Street. a. The sidewalk shall be aligned with the existing sidewalk east of the alley. b. The sidewalk shall conform to the San Diego Regional Standard Drawings (SDRSD) G-07, G-09, and G-10.

22. Curb and gutter shall be installed along the southerly side of West 18 th Street from the westerly end of West 18 th Street to the westerly side of the alle y which runs from West 18 th Street to West 19th Street.
a. The curb and gutter shall run from the end of the street pavement to the alleys and connect to the existing return on the south side and have a new return installed on the north side which mirrors the south return.
b. Curb and gutter shall be in accordance with the SDRSD G-02, G-09, and G-10.

Page 526 of 833 ends

23. West 18th Street shall be reconstructed from the alley to the westerly limit. Full depth reconstruction with four inches of Asphalt Concrete pavement over ten inches of base in accordance with National City Standard Drawing SB-113. Where road surface terminates at the property line on the west end there shall be a 2” x 4” reconstruction with four inches of Asphalt Concrete pavement over ten inches of base in accordance with National City Standard Drawing SB-113. Where road surface terminates at the property line on the west end there shall be a 2” x 4” redwood header in conformance with Cal Trans Section 02513 Asphalt Concrete accordance with National City Standard Drawing SB-113. Where road surface terminates at the property line on the west end there shall be a 2” x 4” redwood header in conformance with Cal Trans Section 02513 Asphalt Concrete Paving. the property line on the west end there shall be a 2” x 4” redwood header in conformance with Cal Trans Section 02513 Asphalt Concrete Paving.

Cal Trans Section 02513 Asphalt Concrete Paving.

Page 527 of 833 ends

 Prior to issuance of a building permit, the applicant shall demonstrate implementation of all applicable Nonresidential Voluntary Measures of the California Green Building Standards Code – Part 11, Title 24, California Code of Regulations (CalGreen) from the Planning and Design, Energy Efficiency, Water Efficiency and Conservation, and Material Conservation and Resource Efficiency Divisions (Appendix A5 of the 2022 California Green Building Standards Code). These measures shall include, but are not limited to, energy efficiency enhanc ements, water use reduction, susta inable building materials, improved indoor environmental quality, and waste management strategies.

53. Prior to the start of construction activities, a qualified biologist shall salvage seed from the Nuttall’s Acmispon ( Acmispon prostratus ) during the appropri ate time of year (June to October), store under appropriate conditions, and coordinate donation of the seeds with a refuge and/or plant nursery (e.g., Sweetwater Marsh National Wildlife Refuge and Native West Nursery) that would apply seed within the refuge boundaries. Appropriate seed storage conditions are in a paper bag, placed in a dry location out of direct sunlight, away from moisture, ideally at 72 degrees Fahrenheit. Seed shall be collected from June to October 2024 and the subsequent spring (2025), provided that the plant is present and ready to seed, as identified in MM-BIO-1 of the MMRP.

54. Where feasible, ground-disturbing activities, including vegetation removal, shall be conducted during the non-breeding season (approximately September 1 through January 14) to avoid violations of the MBTA and California Fish and Game Code §§ 3503, 3503.5 and 3513.

Several species identified as having potential to nest year -round; therefore, regardless of time of year, a pre -construction survey for nesting birds and special-status avian species shall be conducted by a qualified biologist (experienced in the identification of avian species and conducting nesting bird surveys) if activities with the potential to disrupt nesting birds or special-status avian species are scheduled to occur. The survey shall include the Proposed Project and adjacent areas where Project activities have the potential to cause nest failure.

The pre-construction survey shall be conducted no more than three days prior to the start of ground-disturbing activities (including vegetation removal) within the bird breeding season.

Site preparation and construction activities may begin if no nesting birds or special status avian species are observed during the survey. If nesting birds or raptors or spe cial-status avian species are found to be present, avoidance or minimization measures shall be implemented to avoid potential Proposed Project-related impacts to the species. Avoidance and minimization measures shall be de veloped by the qualified biologist and may include seasonal work restrictions, additional survey and monitoring requirements, or non - disturbance buffers established around active nests until the biologist has determined that the nesting cycle is completed. The width of non -disturbance buffers established around active nests will be determined by the qualified biologist (300 feet is typically recommended for songbirds and 500 feet is typically recommended for raptors). Once nesting is deemed complete by the qualified biologist as determined through periodic nest monitoring, the non- disturbance buffer will be removed by the qualified biologist and project work may resume in the area, as identified in MM-BIO-2 of the MMRP.

Page 528 of 833 ends

55. If tree trimming and removal activities are required, these activities should take place outside of the bat maternity season (April 1 to August 31) to the greatest extent feasible. If tree removal must take place during the maternity season, a pre -removal bat survey shall take place to determine if bats are roosting in the trees. If bats are determined to be present in the trees during surveys, tree removal shall be postponed until after the maternity season (September 1 through March 31). All tree-trimming and removal activities shall be conducted under the direct supervision of a qualified bat biologist.

To minimize direct mortality to any roosting bats, including western yellow bat, each palm tree requiring removal shall be trimmed using a two -step process conducted over two consecutive days. On the first day only the outermost fronds of each individual tree shall be removed, including the uppermost live fronds (the top of the tree) entirely on the first day along with the upper 25 percent of the frond skirt. The innermost fronds shall not be trimmed.

No more than 50 percent of the palm fronds shall be removed from each tree during Day 1.

This method would allow for sufficient disturbance of the tree that would encourage any roosting bats within the frond skirt to abandon the tree during evenin g emergence without directly impacting roosting bats within the skirt. The remainder of the tree should be removed on the second day. This procedure need not be implemented if the tree does not have fronds. All fronds must be removed/trimmed using chainsaws or other hand-tools. No use of heavy equipment shall be used to remove fronds.

If bats emerge at any time during the tree trimming, trimming activities shall cease at that individual tree for the remainder of the day to allow for any additional bats roosting in the tree to emerge during evening hours when it is safe and appropriate for them to do so. Trimming of the tree may resume the following morning.

Tree trimming activities in the fall should be conducted on days when weather conditions are such that roosting bats are unlikely to be in torpor (predicted overnight lows on evenings before and after the tree trimming activities are above 45°F) to the extent practicable, as identified in MM-BIO-3 of the MMRP.

56. A maximum of 72 trucks may enter the site for the purposes of fuel transport per day. No vehicles used for fuel transport shall be stored on adjacent public streets.

57. Prior to the issuance of building permits for this project, an operations plan shall be submitted to the National City Planning Division for review and approval. The operations plan shall include, at a minimum, the following:
 A description of how logs will be maintained on the amount of product transferred at the site and the number of trucks transporting fuel.
 A restriction on the maximum number of trucks to enter the site on a daily basis.  A detailed description of routes that incoming and exiting trucks will use. Routes shall be based on established truck routes in the City of National City.  A restriction on truck idling per NCMC Chapter 11.34.

Page 529 of 833 ends

 A description of how the operator will prevent standing or staging of trucks within the right-of-way before fuel is loaded.

58. The project proponent shall enter into an economic benefit agreement with the City of National City providing annual funds for the life of the project in the amount of $200,000.00 for the purpose of implementing strategies aimed at the reduction of emissions and improving the quality of life within neighborhoods in the vicinity of the proposed facility. The agreement shall be r eviewed by the City Attorney’s office and approved by the City Council prior to the commencement of fuel transfer operations at the facility. The use of funds shall be dedicated to the implementation of the goals and strategies found in the AB 617 Portside Community’s approved Community Em issions Reduction Plan (CERP), the City’s approved Climate Action Plan (CAP), and/or other policies explicitly stated in the City’s General Plan that are reasonably related to the stated purpose of the funds.

59. At all times, the facility shall be operated in conformance with all San Diego Air Pollution Control District (SDAPCD) rules and regulations pertaining to the proposed use including, but not limited to, nuisance odors and emissions standards.

60. All required federal, state, or local permits for the installation and operation of the facility shall be approved prior to start of operations. Permits shall be maintained for the life of the project.

Failure to maintain proper operating permits shall constitute a violation of this CUP and CDP.

61. All development plans submitted for the construction of the proposed facility shall adhere to the design regulations of Section 18.18.180 of the previous Land Use Code (Ord. 1503 § 1 (part), 1976: NCLUC § 972-6 (part)). Specifically, the proposed office structure on site shall conform with the materials standards of Section 18.18.240 of the previous Land Use Code (Ord. 1892 § 5, 1986; Ord. 1503 § 1 (part), 1976: NCLUC § 972-6.04)

62. The applicant shall provide a solid six-foot high perimeter wall or fence around the proposed development, subject to visibility triangle requirements for driveways and operational requirements for railway tracks for the purposes of screening the fuel transfer facility and reducing potential noise impacts on the surrounding area. The screening wall or fence shall be protected with graffiti-resistant coating to a height of six feet on all sides facing the exterior of the property. The wall or fence shall be provided in addition to required landscaping.

63. A landscape plan shall be submitted with development plans in conformance with Chapter

18.54 of the previous Land Use Code (Ord. No. 2010-2331, § 1; 3-2-2010). All landscaped areas shall be maintained for the life of the project.

64. Street trees shall be provided at a ratio of one tree per 30 feet along West 18th Street, West 19th Street, and the alley to the east, excepting the portions of frontages occupied by driveways. Trees shall be 24” box size or larger, preferably mature, and of a species providing the maximum shade canopy to the extent permitted by overhead power lines.

65. Shrubs shall be provided at a minimum of two shrubs per six feet along West 18 th Street, West 19 th Street, and the alley to the east, excepting the portions of frontages occupied by driveways. Shrubs shall be a minimum 10-gallon size. Shrubs shall be located on the right- of-way side of the screening wall or fence along West 18th and 19th Streets.

Page 530 of 833 ends

66. Plans submitted for construction shall conform to Chapter 18.60 – Outdoor Lighting of the previous Land Use Code (Ord. 1503 § I (part), 1976: NCLUC § 975-10).

67. Plans submitted for construction shall conform to Chapter 18.86 - Mechanical Equipment of the previous Land Use Code (Ord. 1503 § 1 (part), 1976: NCLUC § 976-1 (part)).

68. Applicant shall coordinate with EDCO to determine the appropriate trash and recycling needs for the project. Location of trash and recycling shall be shown on building permit plans and screened from public view.

69. The design of the project shall not interfere with the ability to utilize Zero Emissions Vehicles (ZEVs) in facility operations.

70. The operator shall work with local outlets to inform residents of employment opportunities at the fuel transfer facility. At a minimum, new positions shall be posted on the National City Chamber of Commerce website.

71. The applicant shall comply with all applicable standards required by outside agencies and service providers. It is advised that, at a minimum, San Diego Gas and Electric and Sweetwater Authority be consulted prior to the submittal of development permits.

72. The Permittee shall attain a 100% reduction/offset in the baseline diesel combustion emissions identified in the Environmental Impact Report (13.6 total tons per year) within five years of the start of project operations through a combination of optimizing truck, rail, and operations, as well as tree distributions as identified in Condition 75.

73. The Permittee shall attain a 50% reduction/offset in the baseline diesel combustion PM 2.5 (fine particulate matter) identified in the Environmental Impact Report (0.25 tons per year) within five years of the start of project operations through a combination of optimizing truck, rail, and operations, as well as tree distributions as identified in Condition No. 75.

74. The applicant agrees to provide up to 100 portable home High -Efficiency Particulate Air (HEPA) purifiers f or residential units within 1,000 feet of th e boundaries of the project location, including manufacturer recommended filter element replacement for 10 years from the commencement of operations. The units shall be of a reputable brand. The distribution program shall be administered by the City.

75. The applicant shall provide a minimum of 100 trees per year for 10 years from the start of project operations that shall be distributed as part of a comprehensive tree planting program.

The program shall be administered by the City in conjunction with a non-profit entity focused on urban forest projects (e.g. Tree San Diego, Cal FIRE, etc.). Priority shall be given to residents located within the AB 617 Portside Community.

76. The applicant s hall submit an emissions reduc tion status report to the Director of Community Development no later than 60 days after the completion of the second full year of operation and each year thereafter until the emissions reduction/offset commitments outlined in Conditions No. 72 and 73 are met.

Indemnification Agreement

Page 531 of 833 ends

The Applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney's fees, against the Cit y or its agents, officers, or employees, relating to the issuance of this permit including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval and any environmental document or decision. The City will promptly notify the Applicant of any claim, action, or proceeding. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnif ication. In the event of such election, the Applicant shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and Applicant regarding litigation issues, the Ci ty shall have the aut hority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition of the matter. However, the Applicant shall not be required to pay or perform any settlement u nless such settlement is approved by the Applicant.

Page 532 of 833 ends

Section 3: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.

PASSED and ADOPTED this 4th day of November, 2025.

__________________________
Ron Morrison, Mayor

ATTEST:
_____________________________
Shelley Chapel, MMC, City Clerk
APPROVED AS TO FORM:
_____________________________
Barry J. Schultz, City Attorney

Page 533 of 833 ends

RESOLUTION NO. 2025-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA,

DENYING THE APPEAL AND AFFIRMING THE PLANNING COMMISSION DENIAL OF A

CONDITIONAL USE PERMIT AND COASTAL DEVELOPMENT PERMIT FOR A PROPOSED

FUEL TRANSFER FACILITY (SAN DIEGO CLEAN FUELS LLC) WITHIN BNSF RAILROAD RIGHT-OF-WAY AND BNSF-OWNED PROPERTY, LOCATED WEST OF THE 1800 BLOCK OF CLEVELAND AVENUE AND NORTH OF WEST 19TH STREET, NORTH TO CIVIC CENTER DRIVE.

WHEREAS, the Planning Commission of the City of Nationa l City considered a Conditional Use Permit and Coastal Development Permit for a proposed fuel transfer facility within BNSF railroad right-of-way and BNSF-owned property, located west of the 1800 block of Cleveland Avenue and north of West 19th Street, nor th to Civic Center Drive at a duly advertised public hearing held on September 15, 2025, at which time the Commission denied the Conditional Use Permit and Coastal Development Permit; and

WHEREAS, subsequent to the Planning Commission denial of the Condit ional Use Permit and Coastal Development Permit , the applicant (“APPELLANT”) appealed the decision of the Planning to the City Council; and

WHEREAS, the City Council of the City of National City considered the appeal of the Planning Commission’s denial of the Conditional Use Permit and Coastal Development Permit at a duly advertised public hearing held on October 7, 202 5 and November 4, 2025 , at which time oral and documentary evidence was presented; and

WHEREAS, at said public hearing the City Council considered the staff report contained in Case File No. 2023-03 CUP, CDP maintained by the City and incorporated herein by reference along with evidence and testimony at said hearing; and

WHEREAS, the action was taken pursuant to all applicable procedures r equired by State law and City law; and

WHEREAS, the action taken is found to be essential for the preservation of the public health, safety and general welfare.

NOW, THEREFORE, THE CITY COUNCIL of NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

Section 1: That the City Council hereby denies the appellants’ appeal of and upholds the Planning Commission’s decision to deny Conditional Use Permit and Coastal Development Permit No. 2023-03 CUP, CDP for a proposed fuel transfer facility within BNSF railroad right -of- way and BNSF-owned property, located west of the 1800 block of Cleveland Avenue and north of West 19th Street, north to Civic Center Drive, and is supported by the following findings:

Page 534 of 833 ends

FINDINGS FOR DENIAL

OF THE CONDITIONAL USE PERMIT

1. The proposed fuel transfer facility is not deemed essential and desirable to the public convenience and welfare, because the delivery of biofuels can be accomplished through other means of delivery with fewer air quality impacts to residents, workers, and visitors to the City of National City.

2. Granting the permit would constitute a nuisance or be injurious or detrimental to the public interest, health, safety, convenience, or welfare, or materially injurious to persons, property, or improvements in the vicinity and zone in which the property is located, because it would increase the use of diesel -powered trucks in a community already overburdened by emissions and further exacerbate air quality issues, and the potential benefits of the Project do not outweigh these problems.

3. In accordance with Policy HEJ-1.5 of the Health and Environmental Justice Element of the National City General Plan, the National City Planning Commission heard public comment from residents that would be p otentially affected by the proposed project with concerns about impacts to health and the environment in their community and took into consideration these comments in the decision to deny the project.

FINDINGS FOR DENIAL

OF THE COASTAL DEVELOPMENT PERMIT

1. The granting of said Coastal Development Permit is inconsistent with applicable plans and ordinances within the City of National City because it will increase the number of diesel - powered trucks within the AB 617 Portside Community. The increased emissions from the project would be in conflict with the goals of the Community Emissions Reduction Plan (CERP) to reduce emissions and improve air quality in environmental justice communities.

The project is also inconsistent with potential land use decisions as required by the Health and Environmental Justice Element of the General Plan.

Section 2: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.

PASSED and ADOPTED this 4th day of November, 2025.
_________________________
Ron Morrison, Mayor
ATTEST:

_____________________________
Shelley Chapel, City Clerk

APPROVED AS TO FORM:

_____________________________
Barry J. Schultz, City Attorney Page 535 of 833

AGENDA REPORT

Department: Finance
Prepared by: Sean W. Pfeifer, Management Analyst
Meeting Date: Tuesday, November 4, 2025
Approved by: Scott W. Huth, Interim City Manager

SUBJECT:

Public Hearing - 2025 Development Impact Fees Schedule

RECOMMENDATION:

Hold a Public Hearing and Adopt the Resolution Entitled, “Resolution of the City Council of the City of National City, California, Adopting the 2025 Development Impact Fee Schedule.”

BOARD/COMMISSION/COMMITTEE PRIOR ACTION:

Not Applicable.

EXPLANATION:

This is a continuation of the Public Hearing that was held on Tuesday, October 21.

The City of National City requires the payment of Development Impact Fees (DIF) on new development as authorized by State of California Government Code Section 66000 et seq., which is known as the Mitigation Fee Act. The purpose of DIF fees is to ensure that new developments pay their fair share of the costs associated with creating new and refurbished infrastructure and facilities that the City must build to meet the needs arising from the new development (also known as Future Facilities) . The City currently charges development impact fees for Parks and Recreation, Police, Fire, and Library facility improvements. The fees were established in 2005 and have not been updated since then. The City also charges transportation development impact fees (TDIF), which were established in 2008 based on a fee study conducted by the San Diego Association of Governments (SANDAG) and have been adjusted annually for inflation based on direction from SANDAG.

In late 2023, City staff issued a request for proposals ( “RFP”) to qualified consulting firms for an Assembly Bill 1600 DIF Nexus Study to review the fees being charged related to new development and evaluate opportunities to implement new fees in compliance with State law . The transportation DIF fees assessed on new development a re set by SANDAG and were excluded from the scope of this study. After a thorough review process, the contract for a Development Impact Fee study was awarded to David Taussig and Associates (“DTA”).

In their study, DTA worked with City staff to project future development activity within National City’s borders, review existing facilities’ ability to absorb greater demand for services, establish the projects necessary to bring the City’s service capacity up to the level necessary to serve a larger population in the future, determine the costs associated with new development’s share of those projects, and establish a nexus between the anticipated development and public facilities needs for the City through 2040.

Page 536 of 833 ends

DTA’s completed study is presented in Exhi bit B. DTA recommends that the four existing DIF categories (Police, Fire, Library, and Parks) be updated and proposes two new fee categories be created, one for City Administration and one for Multi-Modal Transportation . The City Administration fee would be collected for and spent on the acquisition of land, construction of new public buildings, and expansion of existing City facilities to accommodate new growth. The Multi- Modal Transportation fee would support the City’s Transportation Element (adopted i n March, 2024) by providing funds for infrastructure improvements that would make it easier for members of the community to use alternative methods of transportation. Those efforts focus on improving the city’s bike lanes, walking paths, and access to publ ic transportation, among other projects.

The proposed DIF levels are presented in the table below and separately in Exhibit C.

Below is a table comparing the proposed DIF levels with the cities of La Mesa, Encinitas, Santee, Chula Vista, and Poway. A s proposed, the DIF fee will be competitive with comparably sized neighboring municipalities for single-family residences.

$15,761.00
$4,162.00 $4,356.00
$12,032.00
$17,012.00
$38,560.00
$9,179.00
$-
$5,000.00
$10,000.00
$15,000.00
$20,000.00
$25,000.00
$30,000.00
$35,000.00
$40,000.00
$45,000.00
Proposed
National
City
Current
National
City
La Mesa Encinitas Santee Chula Vista Poway
Development Impact Fees by Type, Single-Family
Residence (per dwelling unit)

Page 537 of 833 ends

DTA also recommends that the City perform an annual review to adjust the Development Impact Fee Schedule to reflect the impact of inflation on the costs associated with developing and constructing new facilities. Staff recommends that the City Council authorize staff to perform this review annually and present recommendati ons for changes to the fee schedule based on the California Construction Cost Index (“CCCI”).

Changes to Development Impact Fees require a public hearing, and upon approval, do not become effective for at least ninety (90) days. If adopted at the November 4, 2025, meeting, the Updated Development Impact Fee Schedule as presented in Exhibit C would be effective on February 2, 2026.

FINANCIAL STATEMENT:

If adopted, revenues based on the proposed fee schedule will provide the City with the additional resources necessary to fund the cost of public facilities needed to meet the needs of new development.

RELATED CITY COUNCIL 2020-2025 STRATEGIC PLAN GOAL:

Balanced Budget and Economic Development

ENVIRONMENTAL REVIEW:

This is not a project under CEQA , and is therefore , not subject to environmental review.

CCR15378; PRC 21065.

PUBLIC NOTIFICATION:

A notice of public hearing regarding the review and adoption of the 2025 Development Impact Fee Schedule was posted in the Star News on September 5, 2025 to allow for 30 days’ notice in accordance with Government Code 66016.5. The Agenda Report was posted at least 72 hours before the Regular Meeting date and time, and 24 hours before a Special Meeting in accordance with the Ralph M. Brown Act.

ORDINANCE:

Not Applicable

EXHIBITS:

Exhibit A -- Resolution
Exhibit B – 2025 Development Impact Fee Study and Report Exhibit C – 2025 Development Impact Fee Schedule

Page 538 of 833 ends

RESOLUTION NO. 2025 -

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY , CALIFORNIA, ADOPTING THE 2025 DEVELOPMENT IMPACT FEE SCHEDULE

WHEREAS, Section 66000 et seq. of the Government Code, enacted by the State of California in 1987, allows cities to charge Development Impact Fees to offset the costs associated with providing new infrastructure and facilities demanded as a result of developme nt; subject to assessment, spending, and disclosure requirements per Assembly Bill 1600 (“AB 1600”); and WHEREAS, it was determined that adjustments in Development Impact Fees may be necessary to close the gap between current fees and actual facility development and construction costs because the City of National City’s Development Impact Fee Sch edule had not been updated since 2005; and
WHEREAS, on January 29, 2024, the City of National City (“City”) entered into an agreement with David Taussig and Associates (“DTA”) to conduct a comprehensive AB 1600 DIF Nexus Study for the purpose of establishing updated development Impact Fees and to recommend the appropriate fee justification methodology and fee levels to support specific types of City-selected capital facilities nee ded to serve new growth and determine whether there are additional Development Impact Fees that may be implemented; and WHEREAS, the completed Development Impact Fee Study is presented in Exhibit B to the Agenda Report and provides the necessary analysis and justification to support the proposed new City of National City 2025 Development Impact Fee Schedule as shown in Exhibit C; and WHEREAS, staff recommends that the new Development Impact Fee Schedule be adopted and be regularly reviewed and updated to ensure cost recovery is maintained in future years based on the California Construction Cost Index (“CCCI”); and WHEREAS, a public hearing to consider adjustments to City user fees was held at a publicly noticed regularly scheduled City Council meeting on November 4, 2025, wherein the City Council considered oral and written presentations of City staff, and members of the public; and WHEREAS, after said public hearing, approved changes to City fees will become effective after at least ninety (90) days; therefore, if adopted on November 4, 2025, the 2025 Development Impact Fee Schedule will become effective on February 2, 2026.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

Section 1: That the City Council hereby authorizes the Staff of the City of National City to collect fees according to the 2025 Development Impact Fee Schedule from February 2, 2026, on, superseding all fees previously established for said activities.

Section 2: That the City Council hereby authorizes the Staff of the City of National City to annually review and update at the beginning of each fiscal year the Development Impact Fees to ensure cost recovery is maintained in future years based on the California Construction Cost Index (“CCCI”).

Page 539 of 833 ends

Section 3: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.

PASSED and ADOPTED this 4th day of November, 2025.

Ron Morrison, Mayor

ATTEST:

Shelley Chapel, MMC, City Clerk

APPROVED AS TO FORM:

Barry J. Schultz, City Attorney

Page 540 of 833 ends
Page 541 of 833 ends
Page 542 of 833 ends
Page 543 of 833 ends
Page 544 of 833 ends
Page 545 of 833 ends
Page 546 of 833 ends
Page 547 of 833 ends
Page 548 of 833 ends
Page 549 of 833 ends
Page 550 of 833 ends
Page 551 of 833 ends
Page 552 of 833 ends
Page 553 of 833 ends
Page 554 of 833 ends
Page 555 of 833 ends
Page 556 of 833 ends
Page 557 of 833 ends
Page 558 of 833 ends
Page 559 of 833 ends
Page 560 of 833 ends
Page 561 of 833 ends
Page 562 of 833 ends
Page 563 of 833 ends
Page 564 of 833 ends
Page 565 of 833 ends
Page 566 of 833 ends
Page 567 of 833 ends
Page 568 of 833 ends
Page 569 of 833 ends
Page 570 of 833 ends
Page 571 of 833 ends
Page 572 of 833 ends
Page 573 of 833 ends
Page 574 of 833 ends
Page 575 of 833 ends
Page 576 of 833 ends
Page 577 of 833 ends
Page 578 of 833 ends
Page 579 of 833 ends
Page 580 of 833 ends
Page 581 of 833 ends
Page 582 of 833 ends
Page 583 of 833 ends
Page 584 of 833 ends
Page 585 of 833 ends
Page 586 of 833 ends
Page 587 of 833 ends
Page 588 of 833 ends
Page 589 of 833 ends
Page 590 of 833 ends
Page 591 of 833 ends
Page 592 of 833 ends
Page 593 of 833 ends
Page 594 of 833 ends
Page 595 of 833 ends
Page 596 of 833 ends
Page 597 of 833 ends
Page 598 of 833 ends
Page 599 of 833 ends
Page 600 of 833 ends
Page 601 of 833 ends
Page 602 of 833 ends
Page 603 of 833 ends
Page 604 of 833 ends
Page 605 of 833 ends
Page 606 of 833 ends
Page 607 of 833 ends
Page 608 of 833 ends
Page 609 of 833 ends
Page 610 of 833 ends
Page 611 of 833 ends
Page 612 of 833 ends
Page 613 of 833 ends
Page 614 of 833 ends
Page 615 of 833 ends
Page 616 of 833 ends

Existing Land Uses
[a] [b]
[c] = [a] /[d], or
[c] = [b] / ([d] / 1,000) [d]
Residents per Unit/ Number of Units/
No. of Residents Number of Guests & Employees per Room/ Number of Rooms/ Land Use Type No. of Hotel Guests [1] Employees [2] Employees per 1,000 Non-Res. SF Non-Res. SF Residential 53,395 0 3.08 17,323
Hotel 459 146 0.79 765
Commercial / Retail 0 13,554 2.64 5,136,492
Office 0 2,985 3.51 851,000
Industrial 0 4,113 1.01 4,053,085
Institutional / Other 0 3,118 3.13 996,892
Total 53,854 23,916 NA NA
Projected New Land Uses
Residents per Unit/ Number of Units/
No. of Residents Number of Guests & Employees per Room/ Number of Rooms/ Land Use Type No. of Hotel Guests Employees Employees per 1,000 Non-Res. SF Non-Res. SF [3] Residential 9,415 0 3.08 3,055
Hotel 19 6 0.79 31
Commercial / Retail 0 552 2.64 209,357
Office 0 122 3.51 34,686
Industrial 0 168 1.01 165,199
Institutional / Other 0 127 3.13 40,632
Total 9,434 975 NA NA
Buildout Land Uses
Residents per Unit/ Number of Units/
No. of Residents Number of Guests & Employees per Room/ Number of Rooms/ Land Use Type No. of Hotel Guests Employees Employees per 1,000 Non-Res. SF Non-Res. SF [3] Residential 62,810 0 3.08 20,378
Hotel 478 152 0.79 796
Commercial / Retail 0 14,106 2.64 5,345,849
Office 0 3,107 3.51 885,686
Industrial 0 4,281 1.01 4,218,284
Institutional / Other 0 3,245 3.13 1,037,524
Total 63,288 24,891 NA NA
[1] Source: California Department of Finance, E-5 City/County Population and Housing Estimates (1/1/24).

Hotel guests based on a 60% occupancy rate for the existing hotel rooms in the City. [2] Source: Nielsen Companies, EmploymentProfiles | Employment by NAICS Codes (2024). [3] For residential, based on the SANDAG Regional Growth Forecast (2020), an annualized growth rate of approximately 0.54% is utilized through 2040.

For non-residential, an annualized growth rate of 0.25% is utilized through 2040.

APPENDIX A-1

LAND USE AND DEMOGRAPHIC ASSUMPTIONS

NATIONAL CITY, CALIFORNIA

Page 1 of 1 ends

Existing DU Calculation
Service Factor (Residents and Employees)
[a] [b]
[c] = [a] +
50% x [b]
[d] = [c] /[f], or
[d] = [c] / ([f] / 1,000) [e] = [d] / 3.50 [f] [g] = [e] x [f] Persons Served per Unit/ EDUs per Unit/ Number of Units/ Number of Number of Number of per Room/ per Room/ Number of Rooms/ Total Land Use Type Residents [1] Employees [2] Persons Served [3] per 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 53,395 0 53,395 3.08 1.00 17,323 17,323
Hotel 459 146 532 0.70 0.23 765 173
Commercial / Retail 0 13,554 6,777 1.32 0.43 5,136,492 2,199 Office 0 2,985 1,493 1.75 0.57 851,000 484
Industrial 0 4,113 2,057 0.51 0.16 4,053,085 667
Institutional / Other 0 3,118 1,559 1.56 0.51 996,892 506 Total 53,854 23,916 65,812 NA NA NA 21,351
Projected New DU Calculation
Service Factor (Future Residents and Employees)
Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Employees Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF [4] Number of EDUs Residential 9,415 0 9,415 3.08 1.00 3,055 3,055
Hotel 19 6 22 0.70 0.23 31 7
Commercial / Retail 0 552 276 1.32 0.43 209,357 90
Office 0 122 61 1.75 0.57 34,686 20
Industrial 0 168 84 0.51 0.16 165,199 27
Institutional / Other 0 127 64 1.56 0.51 40,632 21
Total 9,434 975 9,921 NA NA NA 3,219
Buildout DU Calculation
Service Factor (Future Residents and Employees)
Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Employees Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 62,810 0 62,810 3.08 1.00 20,378 20,378
Hotel 478 152 554 0.70 0.23 796 180
Commercial / Retail 0 14,106 7,053 1.32 0.43 5,345,849 2,288 Office 0 3,107 1,553 1.75 0.57 885,686 504
Industrial 0 4,281 2,140 0.51 0.16 4,218,284 694
Institutional / Other 0 3,245 1,623 1.56 0.51 1,037,524 526 Total 63,288 24,891 75,733 NA NA NA 24,570
[1] Source: California Department of Finance, E-5 City/County Population and Housing Estimates (1/1/24).

Hotel guests based on a 60% occupancy rate for the existing hotel rooms in the City. [2] Source: Nielsen Companies, EmploymentProfiles | Employment by NAICS Codes (2024). [3] Persons served equals residents, plus 50% of employees. [4] For residential, based on the SANDAG Regional Growth Forecast (2020), an annualized growth rate of approximately 0.54% is utilized through 2040.

For non-residential, an annualized growth rate of 0.25% is utilized through 2040.

APPENDIX A-1
EQUIVALENT DWELLING UNIT ("EDU") ASSUMPTIONS - CITY ADMINISTRATION FEE

NATIONAL CITY, CALIFORNIA

Page 1 of 1 ends

Existing DU Calculation
Service Factor (Residents, Employees, and Visitors)
[a] [b] [c]
[d] = [a] +
50% x [b]
+ 5% x [c]
[e] = [d] /[g], or
[e] = [d] / ([g] / 1,000) [f] = [e] / 3.50 [g] [h] = [f] x [g] Persons Served per Unit/ EDUs per Unit/ Number of Units/ Number of Number of Number of Number of per Room/ per Room/ Number of Rooms/ Total Land Use Type Residents [1] Employees [2] Visitors [3] Persons Served [4] per 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 53,395 0 0 53,395 3.08 1.00 17,323 17,323
Hotel 459 146 0 532 0.70 0.23 765 173
Commercial / Retail 0 13,554 118,390 12,696 2.47 0.80 5,136,492 4,119 Office 0 2,985 6,597 1,822 2.14 0.69 851,000 591
Industrial 0 4,113 16,375 2,875 0.71 0.23 4,053,085 933 Institutional / Other 0 3,118 242 1,571 1.58 0.51 996,892 510 Total 53,854 23,916 141,604 72,892 NA NA NA 23,648
Projected New DU Calculation
Service Factor (Future Residents, Employees, and Visitor) Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Employees Visitors Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF [5] Number of EDUs Residential 9,415 0 0 9,415 3.08 1.00 3,055 3,055
Hotel 19 6 0 22 0.70 0.23 31 7
Commercial / Retail 0 552 4,825 517 2.47 0.80 209,357 168 Office 0 122 269 74 2.14 0.69 34,686 24
Industrial 0 168 667 117 0.71 0.23 165,199 38
Institutional / Other 0 127 10 64 1.58 0.51 40,632 21
Total 9,434 975 5,772 10,210 NA NA NA 3,312
Buildout DU Calculation
Service Factor (Future Residents, Employees, and Visitor) Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Employees Visitors Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 62,810 0 0 62,810 3.08 1.00 20,378 20,378
Hotel 478 152 0 554 0.70 0.23 796 180
Commercial / Retail 0 14,106 123,215 13,214 2.47 0.80 5,345,849 4,287 Office 0 3,107 6,866 1,897 2.14 0.69 885,686 615
Industrial 0 4,281 17,043 2,992 0.71 0.23 4,218,284 971 Institutional / Other 0 3,245 251 1,635 1.58 0.51 1,037,524 530 Total 63,288 24,891 147,375 83,102 NA NA NA 26,961
[1] Source: California Department of Finance, E-5 City/County Population and Housing Estimates (1/1/24).

Hotel guests based on a 60% occupancy rate for the existing hotel rooms in the City. [2] Source: Nielsen Companies, EmploymentProfiles | Employment by NAICS Codes (2024). [3] Based on Average Daily Trips (excluding employee trips), as published by the Institute of Transportation Engineers, 10th Edition. [4] Persons served equals residents, plus 50% of employees, plus 5% of visitors. [5] For residential, based on the SANDAG Regional Growth Forecast (2020), an annualized growth rate of approximately 0.54% is utilized through 2040.

For non-residential, an annualized growth rate of 0.25% is utilized through 2040.

APPENDIX A-1
EQUIVALENT DWELLING UNIT ("EDU") ASSUMPTIONS - POLICE/ FIRE FEE

NATIONAL CITY, CALIFORNIA

Page 1 of 1 ends

Existing DU Calculation
Service Factor (Residents and Employees)
[a] [b] = [a] [c] = [b] /[e] [d] = [c] / 3.50 [e] [f] = [d] x [e] Persons Served per Unit/ EDUs per Unit/ Number of Units/ Number of Number of per Room/ per Room/ Number of Rooms/ Total Land Use Type Residents [1] Persons Served [2] per 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 53,395 53,395 3.52 1.00 17,323 17,323
Total 53,395 53,395 NA NA NA 17,323
Projected New DU Calculation
Service Factor (Future Residents and Employees)
Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF [3] Number of EDUs Residential 9,415 18,359 3.52 1.00 3,055 3,055
Total 9,415 18,359 NA NA NA 3,055
Buildout DU Calculation
Service Factor (Future Residents and Employees)
Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 62,810 71,754 3.52 1.00 20,378 20,378
Total 62,810 71,754 NA NA NA 20,378
[1] Source: California Department of Finance, E-5 City/County Population and Housing Estimates (1/1/24). [2] Persons served equals residents only, and excludes non-residential land uses. [3] For residential, based on the SANDAG Regional Growth Forecast (2020), an annualized growth rate of approximately 0.54% is utilized through 2040.

For non-residential, an annualized growth rate of 0.25% is utilized through 2040.

APPENDIX A-1
EQUIVALENT DWELLING UNIT ("EDU") ASSUMPTIONS - LIBRARY / PARKS FEE

NATIONAL CITY, CALIFORNIA

Page 1 of 1 ends

Existing Equivalent Benefit Units (Transportation)
[a] [b] [c]
[d] = [a] x [c], or
[d] = [b] / 1,000 x [c]
Average Daily Trips (ADTs)
per Unit/ Total
Number of Units/ Number of per Room/ Daily Trips
Land Use Type Number of Rooms/ Non-Res. SF [1] per 1,000 Non-Res. SF [2] EBUs Residential [1] 17,323 0 8.24 142,742
Hotel [2] 765 0 4.24 3,244
Commercial / Retail 0 5,136,492 25.69 131,944
Office 0 851,000 11.26 9,582
Industrial 0 4,053,085 5.06 20,488
Institutional / Other 0 996,892 3.37 3,360
Total 18,088 11,037,469 NA 311,359
Projected New Equivalent Benefit Units (Transportation) Average Daily Trips (ADTs)
per Unit/ Total
Number of Units/ Number of per Room/ Daily Trips
Land Use Type Number of Rooms [3] Non-Res. SF [3] per 1,000 Non-Res. SF EBUs Residential 3,055 0 8.24 25,170
Hotel 31 0 4.24 132
Commercial / Retail 0 209,357 25.69 5,378
Office 0 34,686 11.26 391
Industrial 0 165,199 5.06 835
Institutional / Other 0 40,632 3.37 137
Total 3,086 449,874 NA 32,043
Buildout Equivalent Benefit Units (Transportation)
Average Daily Trips (ADTs)
per Unit/ Total
Number of Units/ Number of per Room/ Daily Trips
Land Use Type Number of Rooms/ Non-Res. SF per 1,000 Non-Res. SF EBUs Residential [1] 20,378 0 8.24 167,911
Hotel [2] 796 0 4.24 3,376
Commercial / Retail 0 5,345,849 25.69 137,322
Office 0 885,686 11.26 9,973
Industrial 0 4,218,284 5.06 21,323
Institutional / Other 0 1,037,524 3.37 3,496
Total 21,174 11,487,343 NA 343,402
[1] Source: Nielsen Companies, EmploymentProfiles | Employment by NAICS Codes (2024). [2] Based on Average Daily Trips (excluding employee trips), as published by the Institute of Transportation Engineers, 10th Edition. [3] For residential, based on the SANDAG Regional Growth Forecast (2020), an annualized growth rate of approximately 0.54% is utilized through 2040.

For non-residential, an annualized growth rate of 0.25% is utilized through 2040.

APPENDIX A-1
EQUIVALENT BENEFIT UNITS ("EBU") ASSUMPTIONS - MULTI-MODAL TRANSPORTATION FEE

NATIONAL CITY, CALIFORNIA

Page 1 of 1 ends

Existing DU Calculation
Service Factor (Residents and Employees)
[a] [b]
[c] = [a] +
50% x [b]
[d] = [c] /[f], or
[d] = [c] / ([f] / 1,000) [e] = [d] / 3.50 [f] [g] = [e] x [f] Persons Served per Unit/ EDUs per Unit/ Number of Units/ Number of Number of Number of per Room/ per Room/ Number of Rooms/ Total Land Use Type Residents [1] Employees [2] Persons Served [3] per 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 53,395 0 53,395 3.08 1.00 17,323 17,323
Hotel 459 146 532 0.70 0.23 765 173
Commercial / Retail 0 13,554 6,777 1.32 0.43 5,136,492 2,199 Office 0 2,985 1,493 1.75 0.57 851,000 484
Industrial 0 4,113 2,057 0.51 0.16 4,053,085 667
Institutional / Other 0 3,118 1,559 1.56 0.51 996,892 506 Total 53,854 23,916 65,812 NA NA NA 21,351
Projected New DU Calculation
Service Factor (Future Residents and Employees)
Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Employees Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF [4] Number of EDUs Residential 9,415 0 9,415 3.08 1.00 3,055 3,055
Hotel 19 6 22 0.70 0.23 31 7
Commercial / Retail 0 552 276 1.32 0.43 209,357 90
Office 0 122 61 1.75 0.57 34,686 20
Industrial 0 168 84 0.51 0.16 165,199 27
Institutional / Other 0 127 64 1.56 0.51 40,632 21
Total 9,434 975 9,921 NA NA NA 3,219
Buildout DU Calculation
Service Factor (Future Residents and Employees)
Residents per Unit/
Persons Served per Room/ EDUs per Unit/ Number of Units/ Number of Number of Number of Persons Served per per Room/ Number of Rooms/ Total Land Use Type Residents Employees Persons Served 1,000 Non-Res. SF per 1,000 Non-Res. SF Non-Res. SF Number of EDUs Residential 62,810 0 62,810 3.08 1.00 20,378 20,378
Hotel 478 152 554 0.70 0.23 796 180
Commercial / Retail 0 14,106 7,053 1.32 0.43 5,345,849 2,288 Office 0 3,107 1,553 1.75 0.57 885,686 504
Industrial 0 4,281 2,140 0.51 0.16 4,218,284 694
Institutional / Other 0 3,245 1,623 1.56 0.51 1,037,524 526 Total 63,288 24,891 75,733 NA NA NA 24,570
[1] Source: California Department of Finance, E-5 City/County Population and Housing Estimates (1/1/24).

Hotel guests based on a 60% occupancy rate for the existing hotel rooms in the City. [2] Source: Nielsen Companies, EmploymentProfiles | Employment by NAICS Codes (2024). [3] Persons served equals residents, plus 50% of employees. [4] For residential, based on the SANDAG Regional Growth Forecast (2020), an annualized growth rate of approximately 0.54% is utilized through 2040.

For non-residential, an annualized growth rate of 0.25% is utilized through 2040.

APPENDIX A-1
EQUIVALENT DWELLING UNIT ("EDU") ASSUMPTIONS - CITY ADMINISTRATION FEE

NATIONAL CITY, CALIFORNIA

Page 1 of 1 ends

I. Inventory of Existing Police Facilities
Facility Facility Units Quantity
Buildings Square Feet 63,015
Land Acres 1.55
Vehicles Vehicle 57
Equipment Integrated Unit 1
II Existing Facility Standard [a] [b] [c] = [a] / ([b] / 1,000) Existing Facility Units per
Facility Type [3] Facility Units Quantity EDUs 1,000 EDUs Buildings Square Feet 63,015 23,648 2665
Land Acres 2 23,648 0.066
Vehicles Vehicle 57 23,648 2.410
Equipment Integrated Unit 1 23,648 0.042
III. Future Facility Standard [a] [b] [c] = [a] x [b]
Facility Units Future Facilities Units Funded
Facility Type Facility Units per 1,000 EDUs EDUs by New Development Buildings Square Feet 2665 3,312 8,826
Land Acres 0.066 3,312 0.217
Vehicles Vehicle 2.410 3,312 7.984
Equipment Integrated Unit 0.042 3,312 0.140
IV. Police Summary Cost Data [a] [b] [c] = [a] x [b] [d] = [c] / 3312 Facility Units Funded Total Facility Cost for Cost
Facility Type Facility Units by Future Development Cost Per Unit Future Development per EDU Buildings Square Feet 8,826 $1,038 $9,158,644 $2,765 Land Acres 0.217 $1,185,107 $257,296 $78 Vehicles Vehicle 7.984 $75,649 $603,978 $182 Equipment Integrated Unit 0.140 $5,866,608 $821,732 $248 Offsetting Revenue $188,979 $57
Total $10,652,670 $3,216
V. Police Residential Fee Calculation
Land Type EDUs per Unit No. of Projected Units Total EDUs Residential 1.00 3,055 3,055
[a] 3,055
[b] $3,216
[c] = [a] x [b] $9,823,529
[d] 4,583,381
[e] = [c] / [d] $2.14
VI. Police Non-Residential Fee Calculation
EDU's per Room/ Fee per Room / Rooms / Costs Financed
Land Type 1,000 Non-Res. Sq. Ft. per 1,000 Non-Res Sq. Ft. Non-Res. Sq. Ft. by Fees [a] [b] = [a] x 3216 [c] [d] = ([c] / 1,000) x [b]
Hotel 0.23 $726 31 $22,624
Commercial Retail 0.80 $2,579 209,357 $539,932
Office 0.69 $2,234 34,686 $77,498
Industrial 0.23 $740 165,199 $122,274
Institutional / Other 0.51 $1,644 40,632 $66,812
Total NA NA NA $829,140
VII. Police Fee Calculation Summary
Res. Fee per Sq. Ft./
per Room / Projected Res. Sq. Ft./ Costs Financed
Land Type per 1,000 Non‑Res Sq. Ft. Rooms/Non-Res. Sq. Ft. by Fees Residential $2.14 4,583,381 $9,823,529
Hotel $725.58 31 $22,624
Commercial Retail $2,579.00 209,357 $539,932
Office $2,234.29 34,686 $77,498
Industrial $740.16 165,199 $122,274
Institutional / Other $1,644.31 40,632 $66,812
Total NA NA $10,652,670
Total Fees
Total Residential Sq. Ft.

Total Fee per Residential Sq. Ft.

APPENDIX A-1

NATIONAL CITY, CALIFORNIA

POLICE FACILITIES FEE CALCULATION
Total Residential
Total cost per EDU
Appendix A, Page 1Page 623 of 833
I. Inventory of Fire & Rescue Facilities
Facility Facility Units Quantity
Buildings Square Feet 26,044
Land Acres 2.71
Vehicles Vehicle 17.0
Equipment Integrated Unit 1.0
II. Existing Facility Standard [a] [b] [c] = [a] / ([b] / 1,000) Existing Facility Units per
Facility Type [3] Facility Units Quantity EDUs 1,000 EDUs Buildings Square Feet 26,044 23,648 1,101
Land Acres 2.71 23,648 0.115
Vehicles Vehicle 17 23,648 0.719
Equipment Integrated Unit 1 23,648 0.042
III. Future Facility Standard [a] [b] [c] = [a] x [b]
Facility Units Future Facilities Units Funded
Facility Type Facility Units per 1,000 EDUs EDUs by New Development Buildings Square Feet 1,101 3,312 3,648
Land Acres 0.115 3,312 0.380
Vehicles Vehicle 0.719 3,312 2.381
Equipment Integrated Unit 0.042 3,312 0.140
IV. Fire & Rescue Summary Cost Data [a] [b] [c] = [a] x [b] [d] = [c] / 1101 Facility Units Funded Total Facility Cost for
Facility Type Facility Units by Future Development Cost Per Unit Future Development Cost per EDU Buildings Square Feet 3,648 $1,200 $4,377,559 $1,322 Land Acres 0.380 $1,321,442 $501,603 $151 Vehicles Vehicle 2.381 $442,343 $1,053,297 $318 Equipment Integrated Unit 0.140 $909,881 $127,446 $38 Offsetting Revenue $253,577 $77
Total $5,806,329 $1,753
V. Fire & Rescue Residential Fee Calculation
Land Type EDUs per Unit No. of Projected Units Total EDUs Residential 1.00 3,055 3,055
[a] 3,055
[b] $1,753
[c] = [a] x [b] $5,354,399
[d] 4,583,381
[e] = [c] / [d] $1.17
VI. Police Non-Residential Fee Calculation
EDU's per Room/ Fee per Room / Rooms / Costs Financed
Land Type 1,000 Non-Res. Sq. Ft. per 1,000 Non-Res Sq. Ft. Non-Res. Sq. Ft. by Fees [a] [b] = [a] x 1753 [c] [d] = ([c] / 1,000) x [b]
Hotel 0.23 $395 31 $12,331
Commercial Retail 0.80 $1,406 209,357 $294,295
Office 0.69 $1,218 34,686 $42,241
Industrial 0.23 $403 165,199 $66,647
Institutional / Other 0.51 $896 40,632 $36,416
Total NA NA NA $451,930
VII. Police Fee Calculation Summary
Res. Fee per Sq. Ft./
per Room / Projected Res. Sq. Ft./ Costs Financed
Land Type per 1,000 Non‑Res Sq. Ft. Rooms/Non-Res. Sq. Ft. by Fees Residential $1.17 4,583,381 $5,354,399
Hotel $395 31 $12,331
Commercial Retail $1,406 209,357 $294,295
Office $1,218 34,686 $42,241
Industrial $403 165,199 $66,647
Institutional / Other $896 40,632 $36,416
Total NA NA $5,806,329
Total Fees
Total Residential Sq. Ft.

Total Fee per Residential Sq. Ft.

APPENDIX A-1

NATIONAL CITY, CALIFORNIA

FIRE FACILITIES FEE CALCULATION
Total Residential
Total cost per EDU
Appendix A, Page 1Page 624 of 833
I. Inventory of Existing Library Facilities
Facility Facility Units Quantity
Buildings Square Feet 49,000
Land Acres 1.68
Vehicles Vehicle 0.00
Equipment Integrated Unit 1.00
II. Existing Facility Standard [a] [b] [c] = [a] / ([b] / 1,000) Existing Facility Units per
Facility Type [3] Facility Units Quantity EDUs 1,000 EDUs Buildings Square Feet 49,000 17,323 2829
Land Acres 1.68 17,323 0.097
Vehicles Vehicle 0.00 17,323 0.000
Equipment Integrated Unit 1.00 17,323 0.058
III. Future Facility Standard [a] [b] [c] = [a] x [b]
Facility Units Future Facilities Units Funded
Facility Type Facility Units per 1,000 EDUs EDUs by New Development Buildings Square Feet 2829 3,055 8,640
Land Acres 0.097 3,055 0.296
Vehicles Vehicle 0.000 3,055 -
Equipment Integrated Unit 0.058 3,055 0.176
IV. Library Summary Cost Data [a] [b] [c] = [a] x [b] [d] = [c] / 3055 Facility Units Funded Total Facility Cost for Cost
Facility Type Facility Unitsby Future Development Cost Per Unit Future Development per EDU Buildings Square Feet 8,640 $750 $6,480,222 $2,121 Land Acres 0.296 $1,321,442 $391,462 $128 Vehicles Vehicle - $0 $0 $0 Equipment Integrated Unit 0.176 $4,837,107 $852,939 $279 Offsetting Revenue $202,253 $66
Total $7,522,371 $2,463
V. Library Residential Fee Calculation
Land Type EDUs per Unit No. of Projected Units Total EDUs Residential 1.00 3,055 3,055
[a] 3,055
[b] $2,463
[c] = [a] x [b] $7,522,371
[d] 4,583,381
[e] = [c] / [d] $1.64
VI. Library Fee Calculation Summary
Res. Fee per Sq. Ft./
per Room / Projected Res. Sq. Ft./ Costs Financed
Land Type per 1,000 Non‑Res Sq. Ft. Rooms/Non-Res. Sq. Ft. by Fees Residential $1.64 4,583,381 $7,522,371
Total NA NA $7,522,371
Total Fees
Total Residential Sq. Ft.

Total Fee per Residential Sq. Ft.

APPENDIX A-1

NATIONAL CITY, CALIFORNIA

LIBRARY FACILITIES FEE CALCULATION
Total Residential
Total cost per EDU
Appendix A, Page 1Page 625 of 833
I. Inventory of Existing Park Facilities
Facility Facility Units Quantity
Parks Acres 116.60
II. Existing Facility Standard [a] [b] [c] = [a] / ([b] / 1,000) Existing Facility Units per
Facility Type [3] Facility Units Quantity EDUs 1,000 EDUs Parks Acres 116.60 17,323 6.731
III. Future Facility Standard [a] [b] [c] = [a] x [b]
Facility Units Future Facilities Units Funded
Facility Type Facility Units per 1,000 EDUs EDUs by New Development Parks Acres 6.731 3,055 20.560
IV. Park Summary Cost Data [a] [b] [c] = [a] x [b] [d] = [c] / 3055 Facility Units Funded Total Facility Cost for Cost
Facility Type Facility Units by Future Development Cost Per Unit Future Development per EDU Land Acres 20.560 $328,657 $6,757,318 $2,212 Offsetting Revenue $868,251 $284
Total $5,889,067 $1,928
V. Park Residential Fee Calculation
Land Type EDUs per Unit No. of Projected Units Total EDUs Residential 1.00 3,055 3,055
[a] 3,055
[b] $1,928
[c] = [a] x [b] $5,889,067
[d] 4,583,381
[e] = [c] / [d] $1.28
VI. Park Fee Calculation Summary
Res. Fee per Sq. Ft./
per Room / Projected Res. Sq. Ft./ Costs Financed
Land Type per 1,000 Non‑Res Sq. Ft. Rooms/Non-Res. Sq. Ft. by Fees Residential $1.28 4,583,381 $5,889,067
Total NA NA $5,889,067
Total Fees
Total Residential Sq. Ft.

Total Fee per Residential Sq. Ft.

APPENDIX A-1

NATIONAL CITY, CALIFORNIA

PARKS FACILITIES FEE CALCULATION
Total Residential
Total cost per EDU
Appendix A, Page 1Page 626 of 833
I. Existing EBU Calculation
Trip Generation
Rate per Unit/ Number of Existing Average Daily Trips EBUs Land Use Type per 1,000 Non-Res. S.F. Existing Units Non-Residential S.F. (Per Unit/1,000 SF) [1] Residential 8.24 17,323 142,742
Hotel 4.24 765 3,244
Commercial Retail 25.69 5,136,492 131,944
Office 11.26 851,000 9,582
Industrial 5.06 4,053,085 20,488
Institutional / Other 3.37 996,892 3,360
Total NA NA NA 311,359
II. Future EBU Calculation
Trip Generation
Rate per Unit/ Number of Future Average Daily Trips EBUs Land Use Type per 1,000 Non-Res. S.F. Existing Units Non-Residential S.F. (Per Unit/1,000 SF) Residential 8.24 3,055 25,170
Hotel 4.24 31 132
Commercial Retail 25.69 209,357 5,378
Office 11.26 34,686 391
Industrial 5.06 165,199 835
Institutional / Other 3.37 40,632 137
`` NA NA NA 32,043
III. Proposed Facilities Cost
Facility
Facility Cost
Multi Modal Facilities Cost $37,269,231
Offsetting Revenues $0
Total Facilities Cost $37,269,231

IV. Allocation of Facilities to Existing and New Development (based on Daily Trips) Average Daily Trips Percentage of Facility
Development Trips (EBUs) Cost Allocated Cost
Existing Development 311,359 90.67% $33,791,657
New Development 32,043 9.33% $3,477,573
Total Facilities Cost 343,402 100.00% $37,269,231
V. Allocation of Facilities to New Development (based on New EDUs) Facility Cost Facilities
Projected Allocated to Cost Per
Facility Daily Trips New Development Daily Trip
Multi Model Facilities Cost 32,043 $3,477,573 $109
Total Facilities Cost per Daily Trip 32,043 3,477,573 $109 VI. Transportation Impact Fees and Cost Financed by Fees per Unit/per 1,000 Non-Res. S.F.

Projected Fee per Unit / Fees per 1,000 Cost Financed
Land Use Type Daily Trips per Room Non-Res. S.F. by Impact Fees Residential 8.24 $894 $2,731,688
Hotel 4.24 $460 $14,348
Commercial Retail 25.69 $2,788 $583,658
Office 11.26 $1,222 $42,387
Industrial 5.06 $549 $90,631
Institutional / Other 3.37 $366 $14,861
Initial Allocation to New Development $3,477,573
Total Allocated to Existing Development $33,791,657
Total Facilities Costs $37,269,231
VII. Transportation Residential Fee Calculation
Land Type EDUs per Unit No. of Projected Units Total EDUs Residential 8.24 3,055 25,170
[a] 25,170
[b] $109
[c] = [a] x [b] $2,731,688
[d] 4,583,381
[e] = [c] / [d] $0.60
Total Fees
Total Residential Sq. Ft.

Total Fee per Residential Sq. Ft.

APPENDIX A-1

NATIONAL CITY, CALIFORNIA

MULTI-MODEL TRANSPORTATION FEE CALCULATION
Total Residential
Total cost per EDU

Page 627 of 833 ends

APPENDIX A-1

NATIONAL CITY, CALIFORNIA

MULTI-MODEL TRANSPORTATION FEE CALCULATION
VIII. Transportation Non-Residential Fee Calculation
Res. Fee per Sq. Ft./
Projected per Room / Projected Res. Sq. Ft./ Costs Financed Land Type Daily Trips per 1,000 Non‑Res Sq. Ft. Rooms/Non-Res. Sq. Ft. by Fees [a] [b] = [a] x 109 [c] [d] = ([c] / 1,000) x [b]
Hotel 4.24 $460 31 $14,348
Commercial Retail 25.69 $2,788 209,357 $583,658
Office 11.26 $1,222 34,686 $42,387
Industrial 5.06 $549 165,199 $90,631
Institutional / Other 3.37 $366 40,632 $14,861
Total $745,885
IX. Transportation Fee Calculation Summary
Res. Fee per Sq. Ft./
per Room / Projected Res. Sq. Ft./ Costs Financed
Land Type per 1,000 Non‑Res Sq. Ft. Rooms/Non-Res. Sq. Ft. by Fees Residential $0.60 4,583,381 $2,731,688
Hotel $460 31 $14,348
Commercial Retail $2,788 209,357 $583,658
Office $1,222 34,686 $42,387
Industrial $549 165,199 $90,631
Institutional / Other $366 40,632 $14,861
Total NA NA $3,477,573

Page 628 of 833 ends
Page 629 of 833 ends

Buildings Address (Sq. Ft.) Cost / Sq. Ft. Value
City Hall 1243 National City Blvd 42,878 $863 $36,983,115 Martin Luther King Jr. Comm Ctr (HR, Housing/Section 8) 140 E 12th Street 6,539 $863 $5,640,016 Public Works Operations Building 1726 Wilson Ave 6,385 $863 $5,507,188 Total 55,802 $863 $48,130,318
Land (Acres) Cost / Acre Value
City Hall
1243 National City
Blvd 1.56 $1,321,442 $2,061,449
Martin Luther King Jr. Comm Ctr (HR, Housing/Section 8) 140 E 12th Street 1.15 $1,321,442 $1,519,658 Public Works Operations Building 1726 Wilson Ave 0.88 $1,321,442 $1,162,869 Total 3.59 4,743,977
Equipment & Property Facility Units Cost per Unit Cost
2017 North Star - Trailer-Mounted Pressure Washer - Medium Equipment City Hall $2,500 1965 Cummins - Stationary Generator City Hall $150,000
Dell EMC VM Hosts City Hall 4 $35,000 $140,000
Nimble Enterprise SAN Storage City Hall 2 $93,500 $187,000 Synology Backup Storage City Hall 2 $23,000 $46,000
Palo Alto Firewall City Hall 2 $24,500 $49,000
FortiGate Firewall City Hall 2 $12,100 $24,200
Cisco Network Switches City Hall 20 $4,800 $96,000
FortiGate Network Analyzer City Hall 1 $18,000 $18,000
Cisco Secure Servers (Phone System) City Hall 2 $19,200 $38,400 Copiers City Hall 4 $7,502 $30,008
Printers City Hall 35 $575 $20,125
CellPhones City Hall 81 $420/yr $34,020
Data Center UPS City Hall 1 $39,700 $39,700
Desktop Computers City Hall 97 $1,136 $110,192
Laptops City Hall 85 $1,050 $89,250
Cisco Voice Over IP Phone System City Hall $498,000
Avigilon Camera System City Hall $375,545
Council Chambers Audio Video System City Hall $235,500
Cisco Network Switches MLK Comm Cntr 3 $4,800 $14,400
Desktop Computers MLK Comm Cntr 15 $1,136 $17,040
Laptop/Tablet Computers MLK Comm Cntr 6 $1,050 $6,300
Cell Phones /Sims MLK Comm Cntr 6 $35/month x 12 $2,520 Copier MLK Comm Cntr 2 $7,502 $15,004
Audio Video System MLK Comm Cntr $29,755
Printer MLK Comm Cntr 8 $575 $4,600
Cisco Network Switches PW Ops 4 $4,800 $33,600
Desktop Computers PW Ops 16 $1,136 $18,176
Laptop/Tablet Computers PW Ops 10 $1,050 $10,500
Cell Phones /Sims PW Ops 20 $420 $8,400
Copier PW Ops 1 $7,502 $7,502
Printer PW Ops 5 $575 $2,855
Enterprise Software
Microsoft Office / OS $156,000
Munis ERP Financials $580,000
ArcGIS Mapping $14,000
CityWorks Permitting / Licensing $171,600
Escribe Agenda Management $82,000
Swagit Streaming $27,000
VmWare ESX Virtualization $55,870
Veeam Backup Software $28,165
Total 3,468,727
APPENDIX B-1

NATIONAL CITY, CALIFORNIA

CITY ADMINISTRATION FACILITIES INVENTORY
Appendix B, Page 1

Page 630 of 833 ends

APPENDIX B-1

NATIONAL CITY, CALIFORNIA

CITY ADMINISTRATION FACILITIES INVENTORY
Vehicles
Make Model Type Year Cost Replacement
Toyota Truck Tacoma Light Duty 2023 $28,300 $32,545
Hyundai SUV Kona Light Duty 2020 $39,900 $47,572
Hyundai SUV Kona Light Duty 2020 $39,900 $47,572
Kia SUV Niro Light Duty 2020 $39,800 $47,453
Ford Truck Ranger Light Duty 2023 $37,500 $43,125
Toyota Building Truck Tacoma Light Duty 2020 $23,700 $28,257 Toyota Neighbor Svcs Truck Tacoma Light Duty 2020 $23,700 $28,257 Toyota Neighbor Svcs Truck Tacoma Light Duty 2020 $23,700 $28,257 Toyota Neighbor Svcs Truck Tacoma Light Duty 2020 $23,700 $28,257 Hyundai Sedan Ioniq Light Duty 2019 $41,300 $51,440
Hyundai Sedan Ioniq Light Duty 2019 $41,300 $51,440
Hyundai Sedan Ioniq Light Duty 2019 $41,300 $51,440
Ford Sedan Fusion Light Duty 2018 $35,500 $2,575
Hyundai Sedan Ioniq Light Duty 2019 $41,300 $51,440
Nissan Sedan Leaf Light Duty 2023 $28,200 $2,326
Toyota Truck Tacoma Light Duty 2020 $23,700 $28,257
Toyota Truck Tacoma Light Duty 2020 $23,700 $28,257
Ford Truck Ranger Light Duty 2020 $34,800 $41,491
Ford Truck F-550 Medium Duty 2022 $49,300 $53,105
Kia Sedan Optima Light Duty 2016 $26,000 $34,664
Ford Truck Ranger Light Duty 2004 $18,000 $33,699
Ford Cargo Van Transit Connect Light Duty 2019 $29,600 $36,868 22 $798,297
Appendix B, Page 2

Page 631 of 833 ends

Buildings Address (Sq. Ft.) Unit Cost / Sq. Ft. Value
Police Department Building 1200 National City Blvd. 55,755 $1,100 $61,330,500 Police Warehouse 1430 Hoover Ave 6,760 $600 $4,056,000
Police Substation Plaza Bonita Mall 500 $0
63,015 $65,386,500

Land (Acres) Unit Cost / Acre Value
Police Department Building 1200 National City Blvd. 1.39 $1,321,442 $1,836,804 Police Warehouse 1430 Hoover Ave 0.16 $700 $112
Police Substation Plaza Bonita Mall

1.55 $1,185,107 $1,836,916
Vehicles
Make Model Type Year Cost Replacement
Freightliner - PD Command Command Bus Heavy Duty 2008 $312,000 $517,205 Ford BearCat SWAT Truck F550 Heavy Duty 2012 $360,000 $534,969 Ford Van - Passenger E350 Medium Duty 2012 $30,000 $44,581 Ford Van - Surveillance E350 Medium Duty 2013 $75,000 $111,218 Toyota CSO Truck - Light Duty Tacoma Light Duty 2013 $23,800 $35,293 Nissan - Sedan Maxima Light Duty 2013 $32,600 $48,343
Nissan - Sedan Sentra Light Duty 2013 $19,550 $28,991
Ford K9 Patrol SUV Explorer Medium Duty 2015 $51,700 $71,397 Ford K9 Patrol SUV Explorer Medium Duty 2015 $51,700 $71,397 Nissan - Sedan Altima Light Duty 2015 $24,750 $34,179
Nissan - Sedan Altima Light Duty 2015 $24,750 $34,179
Ford - Sedan Taurus Light Duty 2015 $28,230 $38,985
Nissan CSI Van NV2500 Medium Duty 2016 $31,550 $42,063
Ford Animal Control Truck F250 Medium Duty 2016 $75,000 $99,992 Ford Patrol SUV Explorer Medium Duty 2016 $55,500 $73,994 Ford K9 Patrol SUV Explorer Medium Duty 2016 $56,700 $75,594 Nissan Investigations Truck - Light Duty Frontier Light Duty 2016 $25,150 $33,531 Toyota SUV - Light Duty Highlander Light Duty 2016 $38,575 $51,429 Ford - Sedan Fusion Light Duty 2016 $21,250 $28,331
Ford Patrol SUV Explorer Medium Duty 2017 $56,900 $72,819 Dodge Van - Light Duty Caravan Light Duty 2017 $28,175 $36,058 Nissan - Sedan Maxima Light Duty 2017 $35,100 $44,920
Nissan - Sedan Altima Light Duty 2017 $37,000 $47,351
Nissan - Sedan Altima Light Duty 2017 $37,000 $47,351
Ford Animal Control Truck F250 Medium Duty 2018 $85,000 $108,443 Ford Patrol SUV Explorer Medium Duty 2018 $56,900 $72,593 Nissan - Sedan Altima Light Duty 2018 $37,000 $47,205
Toyota - Sedan Camry Light Duty 2018 $27,000 $34,447
Honda - Sedan Accord Light Duty 2018 $25,200 $32,150
Ford Patrol SUV Explorer Medium Duty 2019 $65,000 $80,959 Toyota SUV - Light Duty Highlander Light Duty 2019 $40,500 $50,444 Chrysler Van - Light Duty Pacifica Light Duty 2019 $43,300 $53,931 Toyota - Sedan Camry Light Duty 2019 $27,000 $33,629
Ford - Sedan Fusion Light Duty 2019 $24,000 $29,893
Ford Transit Van - CNT T350 Medium Duty 2020 $140,000 $166,919 Ford Transit Van - Prisoner T350 Medium Duty 2020 $96,000 $114,459 Ford Traffic Truck F250 Crew Medium Duty 2020 $90,000 $107,305 Ford SWAT Supervisor Truck F250 Crew Medium Duty 2020 $95,000 $113,266 Toyota CSO Truck - Light Duty Tacoma Light Duty 2020 $28,400 $33,861 Toyota - Sedan Camry Light Duty 2020 $27,000 $32,191
Toyota - Sedan Camry Light Duty 2020 $27,000 $32,191
BMW Motorcycle 2020 $32,000 $38,153
Ford Patrol SUV Explorer Medium Duty 2021 $70,000 $77,700 Ford K9 Patrol SUV Explorer Medium Duty 2021 $62,000 $68,820 BMW Motorcycle 2021 $33,000 $36,630
Ford Investigations SUV Explorer Medium Duty 2022 $56,000 $60,322 Ford Investigations Truck - Light Duty F150 Crew Light Duty 2022 $49,500 $53,320 Ford Patrol SUV Explorer Medium Duty 2023 $76,000 $87,400 Ford HOT Truck - Light Duty F150 Crew Light Duty 2023 $130,000 $149,500 Ford Investigations Truck - Light Duty F150 Crew Light Duty 2023 $59,700 $68,655 Ford Investigations Truck - Light Duty F150 Crew Light Duty 2023 $49,500 $56,925 Toyota SUV - Light Duty Highlander Light Duty 2023 $44,200 $50,830 Kia SUV - Light Duty Sorento Light Duty 2024 $38,240 $38,240 Kia SUV - Light Duty Sorento Light Duty 2024 $38,240 $38,240 Toyota SUV - Light Duty Highlander Light Duty 2024 $44,200 $44,200 Harley Davidson Motorcycle 2024 $40,000 $40,000
BMW Motorcycle 2024 $35,000 $35,000
57 $3,323,860 $4,311,991
APPENDIX B-1

NATIONAL CITY, CALIFORNIA

POLICE FACILITIES INVENTORY
Appendix B, Page 3

Page 632 of 833 ends

APPENDIX B-1

NATIONAL CITY, CALIFORNIA

POLICE FACILITIES INVENTORY
Equipment & Property Units Cost per Unit Cost
1993 Kohler - Stationary Generator 1 $150,000
2022 Skywatch - Surveillance Trailer - Heavy Equipment $226,200 2005 Universal - Medium Trailer $75,000
1993 Kohler - Stationary Generator $100,000
Desktop Computers (Dell) 128 1136 $145,408
Laptop (Mobile Data Computers)MDC 108 3980 $429,840
AXON Body Cameras (5yrs) 76 $514,840
Copiers 5 7502 $37,510
Printers 35 575 $20,125
Data Center UPS 1 39700 $39,700
Nimble Enterprise SAN Storage 2 93500 $187,000
Dell EMC VM Hosts 2 35000 $70,000
Cell Phones /Sims 87 $35/month x 12 $36,540
800 MHZ Radios 189 4355 $823,095
Cisco Network Switches 10 4800 $48,000
Software
New World Computer Aided Dispatch (CAD) $1,060,000
Glock Duty Pistols w/Holosun SCS MOS Optic Model 17 MOS 95 $850 $80,750 Glock Admin / Detective Pistol 43X 10 $450 $4,500
Colt Patrol Rifles w /Holosun 510C Optic M 55 $1,900 $104,500 Daniels Defense SWAT Rifiles w/Trijicon MOR Optic DDM4 20 $3,000 $60,000 Accuracy Intl. SWAT Sniper Rifles w/Night Force ATACR Optic 4 $6,000 $24,000 DDM4 AT-LE $0
Remington Less Lethal shotgun w/Vortex Spark Optic 870 40 $1,100 $44,000 Remington shotgun 870 2 $900 $1,800
Defense Tech. 40mm less lethal launchers w/Vorotex Spark Optic 4 $1,550 $6,200 Defense Tech. 40mm multi-launcherlaunchers w/Vorotex Spark Optic 2 $4,500 $9,000 Gas Ram For Deployment 1 $700 $700
Burn Safe for Gas Deployment 1 $900 $900
Pepperball Launchers FTC/FT12 80 $900 $72,000
Tasers X2/X26P 100 $1,600 $160,000
FLIR night scope LS 1 $2,000 $2,000
Thernal Camera TT310B 1 $2,300 $2,300
Night Vision monocle SWAT M914 15 $4,500 $67,500
Dual Bean aiming laser Dball3 20 $2,300 $46,000
Active Shooter vests Paraclete10260 100 $1,200 $120,000 Active Shooter helmets AMP 1 100 $2,500 $250,000
SWAT tactical raid vests 20 $3,200 $64,000
SWAT helmets AMP 1 20 $3,100 $62,000
Munitions Pole Vulcan III 1 $2,300 $2,300
Handheld balistic Shields BR WMX6 3 $4,300 $12,900
Accident /crime scene reconstruction equipment FARO 1 $28,000 $28,000 Laser protection glasses Stingerhawk 100 $150 $15,000
Portable Radios Motorola APX 6000 66 $6,500 $429,000 Mobile Radios Motorola APX 6500 36 $6,500 $234,000
$5,866,608
Appendix B, Page 4

Page 633 of 833 ends

Buildings Address (Sq. Ft.) Unit Cost / Sq. Ft. Value
Fire Station #34 343 East 16th street 19,440 $1,200 $23,328,000 Fire Station #31 2333 Euclid Ave 4,700 $1,200 $5,640,000 Fire Station #33 2005 East 4th street 1904 $1,200 $2,284,800 Fire Administration and Fire Prevention 1243 National City Blvd. 26,044 $31,252,800
Land (Acres) Cost / Acre Value
Fire Station #34 343 East 16th street 1.680 $1,321,442 $2,220,022 Fire Station #31 2333 Euclid Ave 0.360 $1,321,442 $475,719 Fire Station #33 2005 East 4th street 0.670 $1,321,442 $885,366 Fire Administration and Fire Prevention 1243 National City Blvd.

2.71 $3,581,108
Vehicles
Make Model Type Year Cost Replacement
Fire Engine Pierce Arrow XT Heavy Duty 2006 $400,000 $728,002 Chevrolet SUV - Battalion Suburban Medium Duty 2006 $60,000 $109,200 Fire Aerial Pierce Arrow XT Heavy Duty 2009 $950,000 $1,504,904 Fire Engine Pierce Arrow XT Heavy Duty 2011 $515,000 $778,444 Fire Aerial Pierce Arrow XT Heavy Duty 2016 $1,034,000 $1,378,554 Ford Truck - Fire Squad F550 Heavy Duty 2016 $170,000 $226,648 Toyota Truck - Fire Inspection Tacoma Light Duty 2016 $40,000 $53,329 Toyota Truck - Fire Inspection Tacoma Light Duty 2016 $40,000 $53,329 Chevrolet SUV - Battalion Suburban Medium Duty 2017 $90,000 $115,179 Nissan Sedan - Fire Inspection Altima Sedan 2018 $24,850 $31,704 Fire Engine Pierce Arrow XT Heavy Duty 2019 $750,000 $934,145 Chevrolet SUV - Chief Tahoe Medium Duty 2021 $50,000 $55,500 Dodge Truck - Fire Squad 5,500 Heavy Duty 2022 $250,000 $269,294 Ford Truck - Battalion F350 Heavy Duty 2022 $130,000 $140,033 Ford Truck - Fire Marshall F150 Crew Medium Duty 2022 $85,000 $91,560 Ford Truck - Fire Crew F350 Crew Heavy Duty 2023 $70,000 $70,001 Fire Engine Pierce Arrow XT Heavy Duty 2024 $980,000 $980,000 13 17 $7,519,826
Equipment & Property Units Cost per Unit Cost
1990 Clark - Forklift - Medium Equipment $75,000
2012 Fabique - Medium Trailer $7,500
2004 Kohler Stationary Generator - FS34 $125,000
2004 Kohler Stationary Generator - FS31 $90,000
2017 Generac - Stationary Generator - FS33 $35,000
Cisco Network Switches 7 4800 $33,600
Desktop Computers 23 1136 $26,128
Laptop/Tablet Computers 10 1050 $10,500
Cell Phones /Sims 87 $35/month x 12 $36,540
800 MHZ Radios 97 4,355 $422,435
RCS Radio Service / yr 97 342 $33,174
Copier 2 7,502 $15,004
$909,881
APPENDIX B-1

NATIONAL CITY, CALIFORNIA

FIRE FACILITIES INVENTORY

Page 634 of 833 ends

Buildings Address (Sq. Ft.) Unit Cost / Sq. Ft. Value
Library 1401 National City Blvd 49,000 $750 $36,750,000 49,000 $750 $36,750,000
Land (Acres) Unit Cost / Acre Value
Library 1401 National City Blvd 1.68 $1,321,442 $2,220,022

1.68 $1,321,442 $2,220,022
Vehicles Existing/Proposed Quantity Cost Total Cost
$0
Equipment Quantity Cost per unit Total Cost
Network Switches 8 4800 $38,400
Public Computers 35 1136 $39,670
Staff Desktop Computers 53 1136 $60,208
Laptop/Tablet Computers 10 1050 $10,500
Cell Phones /Sims 2 420 $840
Copier 5 7502 $37,510
Printer 8 575 $4,600
Dell Server 2 5600 $11,200
Meeting Room Audio Video $23,250
Books (volumes) 188,434 20 $3,768,680
Makerspace equipment 20 502.3 $10,046
Meeting Room AV 1 395000 $395,000
Hanging system 1 7734.24 $7,734
Lounge Seating 15 2233.33 $33,500
PA System 1 20000 $20,000
Microfilm Reader/Printer 1 1500 $1,500
Kyocera Copier 1 1300 $1,300
Book carts 40 459.99 $18,400
Self-check kiosks 2 11542.96 $23,086
RFID gates & workstation shileded 3 10560.98 $31,683
Mis Equipment and property $300,000
$4,837,107

LIBRARY FACILITIES INVENTORY

NATIONAL CITY, CALIFORNIA
APPENDIX B-1
Appendix B, Page 6

Page 635 of 833 ends

Land for Sports Park Address (Acres) Cost / Acre Value
Las Palmas Park Newell St and E 22nd St 18.5 $0
Kimball Park 12th Street and D Ave 23 $0
El Toyon Park 4th Street and U Ave 23.2 $0
Paradise Creek Park Hoover Ave and W 19th 5.6 $0
Butterfly Park Palm Ave and E 22nd St 2.1 $0
Stein Family Farm 1808 F Ave 1.4 $0
National City Golf Course 1439 Sweetwater Rd 42.8 $0
Total 116.60 $0
City built out, only park improvements not using park acre So no land cost per acr used
Vehicles
Make Model Type Year Cost Replacement
Freightliner FL70 Tree Truck - Heavy Duty 2001 $93,000 $193,627 Ford F550 Truck - Medium Duty 2022 $49,300 $53,105
Ford F250 Truck - Medium Duty 2020 $32,700 $38,987
Ford F150 EXT Truck - Light Duty 2020 $27,000 $32,191
Ford F150 Truck - Light Duty 2020 $27,000 $32,191
Toyota Tacoma Truck - Light Duty 2020 $23,500 $28,019
Toyota Tacoma Truck - Light Duty 2020 $23,500 $28,019
Toyota Tacoma Truck - Light Duty 2020 $23,500 $28,019
Ford Ranger Truck - Light Duty 2020 $34,800 $41,491
20 9 $334,300 $475,649
Buildings Address Square Feet Cost Total Cost
ARTS Center 200 E 12th St 17,634 $500 $8,817,000
Camacho Recreation Center 1810 E 22nd Street 12,738 $400 $5,095,200 Casa de Salud Recreation Center 1408 E Harding Ave 7,060 $400 $2,824,000 Morgan Towers Nutrition Center 1415 D Ave 6,670 $400 $2,668,000 Martin Luther King Jr. Comm Ctr (excluding Admin)140 E 12th Street 12,391 $400 $4,956,400 Boys and Girls Club 1430 D Ave 25,860 $400 $10,344,000
Historic Kimball House 923 A Ave 2,030 $400 $812,000
Historic Railcar Depot 922 W 23rd Street 4,550 $400 $1,820,000 $37,336,600
APPENDIX B-1

NATIONAL CITY, CALIFORNIA

PARKS FACILTIES INVENTORY
Appendix B, Page 7

Page 636 of 833 ends

APPENDIX B-1

NATIONAL CITY, CALIFORNIA

PARKS FACILTIES INVENTORY
Additional Equipment & Property Units Cost per Unit Costs 2009 Case 570MXT - Tractor - Heavy Equipment $98,500
1991 Century Stage - Heavy Trailer $53,200
2000 Areator - Medium Equipment $5,000
2009 Kubota Tractor 4400 - Medium Equipment $36,600
2018 Toro Mower - Medium Equipment $68,800
2020 Vermeer BC1000XL - Chipper - Medium Equipment $43,000 1987 RPM - Medium Trailer $1,000
2002 Aros - Medium Trailer $3,000
2005 Pace - Medium Trailer $7,500
2000 EX-Mark Metro - Mower- Light Equipment $2,500
2012 Vermeer SC292 Root Grinder - Light Equipment $23,000 2017 Cushman 800 - Golf Cart - Light Equipment $6,800
2017 Cushman 800 - Goft Cart - Light Equipment $6,800
2020 Vermeer RTX130 Trencher - Light Equipment $9,500
2024 Toro Mower- Light Equipment $30,000
2024 EX-Mark Lazer-Z Mower - Light Equipment $27,000
1987 RPM - Light Trailer $1,300
2023 Aluma 7712H-S-TG - Light Trailer $4,610
Cisco Network Switches 4 4,800 $33,600
Desktop Computers 3 1,136 $3,408
Laptop/Tablet Computers 1 1,050 $1,050
Cell Phones /Sims 2 420 $840
Printer 3 575 $1,725
Cisco Network Switches 1 4,800 $4,800
Desktop Computers 10 1,136 $17,040
Laptop/Tablet Computers 6 1,050 $6,300
Cell Phones /Sims 7 $35/month x 12 $2,940
Audio Video System $6,500
Printer 5 575 $2,875
Aquatics facility?
Total #REF! $509,188
Appendix B, Page 8

Page 637 of 833 ends

Facility Name Total Cost Policy Background
Bicycle
18th Street Bicycle Boulevard 18th StreetPalm Avenue to Rachael Avenue Class III $1,319,675 Ciy's Bicycle Master Plan Highland Avenue Bike Lanes Highland Avenue 30th Street to SR 54 exit ramp Class II $386,909 Ciy's Bicycle Master Plan F Avenue Bicycle Boulevard- F Avenue- 18th Street to 28th StreetClass III Boulevard $1,728,774 Ciy's Bicycle Master Plan - 26th Street- D Avenue to 18th Street
8th Street Complete Street Improvements- 8th Street- Harbison Avenue to Paradise Valley Road (Class III)Class II $533,106 Ciy's Bicycle Master Plan - Paradise Valley Road- 8th Street east to City Boundary (Class II)Class III Route D Avenue Bicycle BoulevardD AvenueDivision Street to 18th StreetClass III Boulevard $1,491,233 Ciy's Bicycle Master Plan Division Street Cycle TrackDivision StreetLauren Avenue to Euclid AvenueClass IV $2,248,624 Ciy's Bicycle Master Plan 30th Street Cycle Track30th StreetHoover Avenue to Highland AvenueClass IV $2,314,760 Ciy's Bicycle Master Plan 16th Street Bicycle Corridor16th StreetHighland Avenue to Harbison AvenueClass III Route $361,379 Ciy's Bicycle Master Plan Granger Avenue Bicycle Corridor- Lanoitan Avenue- 16th Street to 24th StreetClass III Route $247,520 Ciy's Bicycle Master Plan - Granger Avenue- 18th Street to 24th Street
- 24th Street- Euclid Avenue to Granger Avenue
24th Street Complete Street Improvements24th StreetHoover Avenue to Highland Avenue (Class II) and Highland Avenue to N Avenue (Class IIIClass II $1,186,008 Ciy's Bicycle Master Plan Class III Boulevard
Las Palmas Bicycle Corridor- Roselawn Street- L Avenue to N AvenueClass III Route $131,186 Ciy's Bicycle Master Plan - N Avenue- Roselawn Street to 22nd Street
- 22nd Street- N Avenue to Palm Avenue
- Palm Avenue- 22nd Street to 18th Street
Hoover Avenue Cycle TrackHoover Avenue22nd Street to 33rd StreetClass IV $2,513,168 Ciy's Bicycle Master Plan 22nd Street Cycle Track22nd StreetWilson Avenue to D AvenueClass IV $1,884,876 Ciy's Bicycle Master Plan Harbison Avenue Bicycle Corridor- Harbison Avenue4th Street to 16th Street, Earle DriveClass III Route $252,470 Ciy's Bicycle Master Plan - Earle Drive
Olive Avenue Bike LanesOlive Avenue8th Street to Plumas StreetClass II $277,781 Ciy's Bicycle Master Plan El Toyon-Las Palmas Bicycle Corridor Multi-Use PathRecreational trailBeta Street to 4th StreetClass I $617,027 Ciy's Bicycle Master Plan D Avenue Bike LanesD Avenue30th Street to southern terminusClass II $228,177 Ciy's Bicycle Master Plan Civic Center Drive Complete Street Improvements Civic Center DriveTidelands Avenue to Wilson AvenueClass III Route $64,355 Ciy's Bicycle Master Plan Highland Avenue Complete Street ImprovementsHighland AvenueDelta Street to 2nd Street (Class II) and 2nd Street to 4th Street (Class III)Class II $429,008 Ciy's Bicycle Master Plan Class III Route
19th Street Bike Lanes19th StreetKiss Street to McKinley AvenueClass II $426,592 Ciy's Bicycle Master Plan B Avenue Bicycle Boulevard/Advisory Bicycle LanesB Avenue1st Street to 4th StreetClass III Boulevard $250,738 Ciy's Bicycle Master Plan Bay Marina Drive Bike LanesBay Marina DriveTidelands Avenue to Marina WayClass II $248,019 Ciy's Bicycle Master Plan Roosevelt Avenue North Bike LanesRoosevelt Avenue8th Street to 12th StreetClass II $248,019 Ciy's Bicycle Master Plan 16th Street Bike Lanes16th StreetWilson Avenue to National City BoulevardClass II $307,543 Ciy's Bicycle Master Plan Roosevelt Avenue South Bike LanesRoosevelt AvenueCivic Center Drive to 16th StreetClass II $188,494 Ciy's Bicycle Master Plan 21st Street Bicycle Corridor21st StreetF Avenue to L AvenueClass III Route $94,058 Ciy's Bicycle Master Plan Bicycle Total $19,979,499
ADA Transition Plan
Pedestrian Ramps (130 Ramps @ $10,000 each) FY 2019-2024 $130,000 ADA Transition Plan Sidewalks ( 10,089.21 SF @ $20 SF) FY 219-2024 $201,784 ADA Transition Plan Pedestrian Ramps (1300 Ramps @ $10,000 each) FY 2025- 2029 $13,300,000 ADA Transition Plan Sidewalks (182,897.38 SF @ $20 SF) FY 2025-2029 $3,657,947 ADA Transition Plan ADA Transition Plan Total $17,289,732
Subtotel $37,269,231
Offsetting Revenue $0.00
Total $37,269,231
APPENDIX B-1

NATIONAL CITY, CALIFORNIA

TRANSPORTATION FACILTIES LIST
(Planned Projects)
Appendix B, Page 9

Page 638 of 833 ends
Page 639 of 833 ends

APPENDIX C-1

NATIONAL CITY, CALIFORNIA

LAND INVENTORY
City Property Location County Last Sale Acres Total Price Price/Acre National City 16th St San Diego 4/10/2025 1.71 $1,350,000 $789,474 National City 3600 Paradise Valley Rd San Diego 2/27/2025 7.94 $2,925,000 $368,388 National City 2039 E 8th St San Diego 9/26/2022 0.98 $1,150,000 $1,173,469 National City 945 N Ave San Diego 5/2/2022 1.57 $2,150,000 $1,369,427 National City 3202 Hoover Ave San Diego 12/22/2021 3.10 $9,077,202 $2,928,130 National City 1320 Highland Ave San Diego 9/2/2021 1.61 $2,860,000 $1,776,398 National City 0 Civic Center Dr San Diego 12/15/2020 0.52 $1,100,000 $2,115,385 National City 2010 Haffley Ave San Diego 10/20/2020 1.71 $800,000 $467,836 National City 1520 E Plaza Blvd San Diego 2/25/2020 1.06 $680,000 $641,509 National City 2501 E 18th St San Diego 2/7/2020 0.34 $627,000 $1,860,534 National City 2504 Highland Ave San Diego 1/10/2020 0.39 $350,000 $897,436 National City E 9th St San Diego 4/19/2019 0.30 $750,000 $2,464,673 National City 32nd St San Diego 3/29/2019 1.61 $525,000 $326,087 Average $1,321,442

Page 640 of 833 ends
Page 641 of 833 ends

Adopted October 21, 2025
Effective January 19, 2026
Land Use
City
Administration Police Fire Library Parks Multi-Modal Total Residential (Per Square Foot) 1.78$ 2.14$ 1.17$ 1.64$ 1.28$ 0.60$ 8.61$ Hotel (Per Room) 604.00$ 726.00$ 395.00$ -$ -$ 460.00$ 2,185.00$ Commercial/Retail (Per 1,000 Sq. Ft.) 1,146.00$ 2,579.00$ 1,406.00$ -$ -$ 2,788.00$ 7,919.00$ Office (Per 1,000 Sq. Ft.) 1,523.00$ 2,234.00$ 1,218.00$ -$ -$ 1,222.00$ 6,197.00$ Industrial (Per 1,000 Sq. Ft.) 441.00$ 740.00$ 403.00$ -$ -$ 549.00$ 2,133.00$ Institutional/Other (Per 1,000 Sq. Ft.) 1,358.00$ 1,644.00$ 896.00$ -$ -$ 366.00$ 4,264.00$ Notes:

1. Residential fees are for single-family residences, multi-family residences, and mobile homes and are per square foot to comply with California AB 602.

2. Hotel fees are per room

3. Non-Residential fees are per 1,000 square feet

EXCLUDING THE TRANSPORTATION DEVELOPMENT IMPACT FEE

DEVELOPMENT IMPACT FEE SCHEDULE

CITY OF NATIONAL CITY

Page 642 of 833 ends

AGENDA REPORT

Department: Finance
Prepared by: Sean W. Pfeifer, Management Analyst
Meeting Date: Tuesday, November 4, 2025
Approved by: Scott W. Huth, Interim City Manager

SUBJECT:

Amendments to the Neighborhood Services and Building Department Fees in the 2025 City of National City Master Fee Schedule

RECOMMENDATION:

Hold a Public Hearing and A dopt the Resolution Entitled : “Resolution of the City Council of the City of National City, California, Adopting Updated City User Fees for the Neighborhood Services and Building Departments and Updating the Master Fee Schedule.”

BOARD/COMMISSION/COMMITTEE PRIOR ACTION:

Not Applicable.

EXPLANATION:

On June 3, 2025, the City Council adopted the 2025 Master Fee Schedule for user fees within the City of National City, with the fee changes to go into effect on August 6, 2025. The 2025 Master Fee Schedule was based upon a study provided by Wildan Consultants that establis hed the level of fees necessary for the City to recapture the costs involved with providing services.

The study established the maximum level for the fees as allowed by State law, and cities are allowed to charge less than the maximum at their discretion.

In the months following adoption of the new fee schedule, City staff in the Building and Neighborhood Services departments have identified a handful of Schedule components to amend. These amendments include new fees, reduced fees, and the division and consolidation of fees to match operational needs. Additionally, this amendment clarifies certain fee titles and descriptions and remedies minor clerical errors.

Details regarding the proposed changes can be found in Exhibit B, “Proposed Neighborhood Services and Building Department Updates.” Exhibit C, “ 2025 Master Fee Schedule, Amended November 2025,” incorporates the proposed changes into the wider 2025 User Fee Schedule.

Below is a table summarizing the proposed changes.

Neighborhood
Services
Building
Department
Fees Increased 3 0
Fees Decreased 0 9
New Fees 5 4
Fees Removed or
Consolidated
2 18

Page 643 of 833 ends

Of note is the introduction of a new “Daylighting” fee that allows the City to enforce AB 413, which prohibits parking, stopping, or standing a vehicle within twenty (20) feet of the approach side of any marked or unmarked crosswalk, and within 15 feet of a crosswalk with a curb extension. The “Daylighting” fees were not included in the fee schedu le that was adopted in June because City Staff required direction from the State of California regarding the new regulations ’ enforcement.

Additionally, the proposed amendments update fine amounts and remove outdated fines that have been replaced.

Neighborhood Services proposes that the following fees be increased:

1. Parked In Bicycle Lane - $48.00, from $47.50

2. Disabled Zone/ Curb Cut - $288.00, from $38.00

3. Expired Registration - $50.00, from $35.00

Neighborhood Services proposes the addition of the following fees:

1. Rent/Lease/Sell (11.32.080(b)) – $48.00

2. CVC 22500 N – Parked Within 20FT of Crosswalk (Daylighting) - $38.00

3. Parked w/in 15' of hydrant (11.32.140 and CVC 22514) - $48.00

4. Street Sweeping Zone (11.32.400) - $48.00

5. Unattended Heavy Duty Detached Trailer (11.32.365) – $48.00

Neighborhood Services proposes that the following fees be removed:

1. Tractor/ Trailer Parked in Residential

2. Camping in vehicle parking penalty

The Building Department proposes amendments to their fee schedule to better match operations.

These amendments include consolidating fees for activities that were spread across multiple fee lines, editing the fee name and descriptions for clarity, and removing fees for services that are no longer provided by the City or are covered by other fees.

Building proposes that the following fees be decreased:

1. Water Heater (residential) - $75.00, from $187.00

2. Air Conditioning Unit - $125.00, from $157.00

3. Furnaces (F. A. U., Floor) - $125.00, from $157.00

4. Wall Heater - $125.00, from $157.00

5. Heat Pump (Package Unit) - $175.00, from $209.00

6. Heater (Unit, Radiant, etc.) - $125.00, from $157.00

7. 25-to-40-amp circuits - $64.00 each, from $209.00

8. 50-to-175-amp circuits - $87.00 each, from $209.00

9. 200 amp and larger circuits - $109.00 each, from $209.00

Building proposes the addition of the following fees:

1. Generator Installation - per 100kW or portion thereof after first 100kW - $209.00

2. Insulation - Per 100 Sq Ft. or portion thereof after first 500 Sq Ft. - $80.00

3. Re-Roof - TPO Membrane (First 3 inspections) - $432.00

4. Re-Roof - TPO Membrane (Per inspections after first 3) - $144.00

Building proposes that the following fees be removed:

1. Stand Alone Mechanical Plan Check

2. Stand Alone Electrical Plan Check

3. Three Phase Service

4. 15 or 20 amp – over 100 circuits

5. Temporary Pole

6. Pre-Inspection

Page 644 of 833 ends

7. Stand Alone Plumbing Plan Check

8. Gas Outlets

9. Drain-Vent repair I Alterations

10. Graywater Systems (per hour)

11. Medical Gas System (Each Outlet)

12. Demolition – Residential Partial Demo (flat fee)

13. Fireplace

14. Detached Garage

15. Partition – Residential, interior

16. Additional partition

17. Camp/Metal – first 500 sq. ft.

18. Each additional 100 sq. ft.

The spreadsheet depicting the building permit fees that were approved by the Council in June featured a column that had been inadvertently hidden. The updated schedule as shown in Exhibits B and C rectifies that oversight.

Changes to City fees require a public hearing, and upon approval, do not become effective for at least sixty (60) days. If adopted at the November 4 meeting, the updated user fees as presented in Exhibit B would come into effect on January 5, 2026. The updated Master Fee Schedule with the updated user fees is presented in Exhibit C.

FINANCIAL STATEMENT:

The 2025 User Fee Schedule is based upon the principle of full cost recovery wherever feasible, and these updates leave the original logic intact. Consolidating the fees to bring them in line with operational practices will enhance cost recovery. Meanwhile, staff expects the impact of lowering the fees that are now being subsidized through these amendments will be revenue neutral due to improved compliance.

RELATED CITY COUNCIL 2020-2025 STRATEGIC PLAN GOAL:

Balanced Budget and Economic Development

ENVIRONMENTAL REVIEW:

This is not a project under CEQA , and is therefore , not subject to environmental review.

CCR15378; PRC 21065.

PUBLIC NOTIFICATION:

The Agenda Report was posted at least 72 hours before the Regular Meeting date and time, and 24 hours before a Special Meeting in accordance with the Ralph M. Brown Act. Notice of the public hearing was posted on the City Website and Bulletin Boards, and published in the Star - News on October 3, 2025.

ORDINANCE:

Not Applicable

EXHIBITS:

Exhibit A – Resolution
Exhibit B – Proposed Neighborhood Services and Building Department Updates Exhibit C – 2025 Master Fee Schedule, Amended November 2025

Page 645 of 833 ends

RESOLUTION NO. 2025 -

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY , CALIFORNIA,

ADOPTING UPDATED CITY USER FEES FOR THE NEIGHBORHOOD SERVICES AND

BUILDING DEPARTMENTS AND UPDATING THE MASTER FEE SCHEDULE

WHEREAS, cities throughout the State face limited resources, making it critical for them to ensure that their fees for required or requested services reflect the cost recovery that is consistent with California law and do not exceed the estimated reasonable cost of providing the service for which the fee is charged; and

WHEREAS, on June 3, 2025, the City of National City (“City”) adopted the City of National City Master Fee Schedule via Resolution 2025-62; and

WHEREAS, the Master Fee Schedule includes a number of user fees, which are charges for service provided by a governmental agency to the public for services that primarily benefit individual users rather than the community at large; and

WHEREAS, subsequent to adoption of the Master Fee Schedule, further review of City operations and services revealed the need to further update the user fees for the Neighborhood Services and Building departments; and
WHEREAS, the updated user fees include nine new fees, three increased fees, nine decreased fees, and twenty removed or consolidated fees, as shown in Exhibit B to the Agenda Report; and
WHEREAS, changes to City fees require a public hearing and, upon approval, do not become effective for at least sixty (60) days; and
WHEREAS, a public hearing was noticed and held on November 4, 2025, in accordance with State law; and
WHEREAS, upon approval, the updated user fees will become effective on January 5, 2026.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

Section 1: That the City Council hereby authorizes the adoption of the user fees as listed in Exhibit B to the Agenda Report, while all other user fees adopted by Resolution 2025-62 shall remain the same. The updated Master Fee Schedule is attached to the Agenda Report as Exhibit C.

Section 2: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.

Page 646 of 833 ends

PASSED and ADOPTED this 4th day of November, 2025.

Ron Morrison, Mayor

ATTEST:

Shelley Chapel, MMC, City Clerk

APPROVED AS TO FORM:

Barry J. Schultz, City Attorney

Page 647 of 833 ends

MEMORANDUM

FINANCE DEPARTMENT, CITY OF NATIONAL CITY
SUBJECT: Proposed Amendments to the Neighborhood Services and Building Department Fees in the 2025 City of National City Master Fee Schedule DATE: October 1, 2025
CONTACT: Sean W. Pfeifer, Management Analyst
O
n Tuesday, November 4, 2025, the City Council of the City of National City, California, will hold a Public Hearing to discuss amendments that have been proposed for the City’s Neighborhood Services and Building Department fees. Details regarding the proposed amendments can be found in the enclosed documents.

The City Council adopted the 2025 National City Comprehensive User Fee Schedule on June 3, 2025. In the months since then, City Staff have identified various items to be changed within the Schedule that include new fees to be added, subsidies to encourage compliance, titles and descriptions to clarify, and clerical errors to be remedied.

Of particular note is the addition of new fees that allow the City to enforce AB 413 (the “Daylighting” law), which prohibits parking, stopping, or standing a vehicle within twenty (20) feet of the approach side of any marked or unmarked crosswalk, and within 15 feet of a crosswalk with a curb extension. The “Daylighting” fees were not included in the fee schedule that was adopted in June because City Staff required clarification from the State of California regarding the new regulations.

Should you have any questions about the fee schedule amendments, please contact the Finance Department.

Should the resolution be adopted, these amendments to the fee schedule would come into effect on January 5, 2026.

Page 648 of 833 ends

Proposed NSD Amendments
Neighborhood Services
Description
Adopted
Fee
Proposed
Change
1 Parked In Bicycle Lane $47.50 $48.00
2 Disabled Zone/ Curb Cut $38.00 $288.00
3 Rent/Lease/Sell (11.32.080(B)) New $48.00
4 CVC 22500 N – Parked Within 20FT of Crosswalk (Daylighting) New $38.00 5 Parked w/in 15' of hydrant (11.32.140 and CVC 22514) New $48.00 6 Street Sweeping Zone (11.32.400) New $48.00
7 Unattended Heavy Duty Detached Trailer (11.32.365) New $48.00 8 Expired Registration $35.00 $50.00
9 Tractor/ Trailer Parked In Residential $48.00 Remove
10 Camping in vehicle parking penalty $48.00 Remove

Page 1 of 4 ends

Proposed Building Amendments
Building
# Description Fee Proposed Change
1 Stand Alone Mechanical Plan Check $125.00 Remove
2 Air Conditioning Unit $157.00 $125.00 *Subsidized
3 Furnaces (F. A. U., Floor) $157.00 $125.00 *Subsidized 4 Wall Heater $157.00 $125.00 *Subsidized
5 Heat Pump (Package Unit) $209.00 $175.00 *Subsidized 6 Heater (Unit, Radiant, etc.) $157.00 $125.00 *Subsidized 7 Stand Alone Electrical Plan Check $125.00 Remove
8 New/Upgraded Service - Per 100 Amps or portion thereof $179.00 Fee name updated 9 Three Phase Service $179.00 Remove
10 15 to 20 amp Circuit - First 10 circuits $209.00 Fee name updated 11 15 to 20 amp Circuits - Per circuit after first 10 $19.00 Fee name updated 12 15 or 20 amp -over 100 circuits $209.00 Remove
13 25 to 40 amp circuits $209.00 $64.00 each
14 50 to 175 amp circuits $209.00 $87.00 each
15 200 amp and larger circuits $209.00 $109.00 each
16 Temporary Power Pole $209.00 Fee name updated
17 Temporary Pole $209.00 Remove
18 Pre-Inspection $144.00 Remove
19 Generator Installation - up to 100kW $720.00 Fee name updated 20 Generator Installation - per 100kW or portion thereof after first 100kW $209.00 THIS IS A NEW ADDED
LINE
21 Stand Alone Plumbing Plan Check $125.00 Remove
22 Fixtures $22.00 Clarify fee is $22.00 each
23 Gas Outlets $122.00 Remove
24 Water Heater - Residential (No Admin Fee) $187.00 $75.00 *Subsidized 25 Water/Drain Pipe Repair/Replacement/Alteration - Per 100 Linear Feet or portion thereof $187.00 Fee name updated 26 Drain- Vent Repair I Alterations $187.00 Remove
27 Graywater Systems (per hour) $209.00 Remove
28 Medical Gas System (Each Outlet) $209.00 Remove
29 Repetitive plan check review - Applicable to a Single-Family Residential Development with 4 or more total units of the same square footage, floor plan setbacks, and elevations.

First permit at
100% of Fee
Schedule
Rate, each
additional at
25% for Plan
Check Fee,
Inspections @
Full Fee
Schedule
Rate
Fee description updated

Page 2 of 4 ends

Proposed Building Amendments
30 Telecom Facility Equipment Container $864.00 Clarifies container type 31 New Telecom Tower $690.00 Fee name updated
32 Collocation on Existing Telecom Tower $613.00 Fee name updated 33 Attached Awning/Canopy $570.00 Fee name updated
34 Demolition-Residential Partial Demo (flat fee) $363.00 Remove 35 Fireplace Hourly Rate of
Personnel Remove
36 Fireplace - Masonry $683.00 Fee name updated
37 Fireplace - Pre-Fabricated/Metal $389.00 Fee name updated 38 Residential Garage (Attached or Detached) $997.00 Fee name updated 39 Detached $997.00 Remove
40 Residential Greenhouse $412.00 Fee name updated
41 Insulation - First 500 Sq Ft. $264.00 Fee name updated 42 Insulation - Per 100 Sq Ft. or portion thereof after first 500 Sq Ft. $80.00 THIS IS A NEW ADDED LINE
43 Interior Partition Wall - First 30 Linear Feet $565.00 Fee name updated 44 Interior Partition Wall - Per 30 Linear Feet or portion thereof after first 30 Linear Feet $124.00 Fee name updated
45 Partition-Residential, Interior $565.00 Remove
46 Additional partition $124.00 Remove
47 Foundation - Cast in place concrete (first 10 piles) $584.00 Fee name updated 48 Foundation - Additional cast in place piles (increments of 10) $138.00 Fee name updated 49 Foundation - Driven (steel, pre-stressed concrete) $599.00 Fee name updated 50 Foundation - Additional driven piles (increments of 10) $153.00 Fee name updated 51 Residential Remodel (Including Garage Conversions) - First 500 Sq Ft. $859.00 Fee name updated
52 Residential Remodel (Including Garage Conversions) - Per 100 Sq. Ft. or portion thereof after first 500 Sq Ft. $68.00 Fee name updated 53 Re-Roof - First 500 Sq Ft. $316.00 Fee name updated
54 Re-Roof - Per 100 Sq Ft. or portion thereof after first 500 Sq Ft. $63.00 Fee name updated 55 Camp/Metal- first 500 sq.ft. $316.00 Remove
56 each additional100 sq.ft. $63.00 Remove
57 Re-Roof - TPO Membrane (First 3 inspections) $432.00 THIS IS A NEW ADDED LINE
58 Re-Roof - TPO Membrane (Per inspections after first 3) $144.00 THIS IS A NEW ADDED LINE
59 Roof Structure Replacement - First 500 Sq Ft. $721.00 Fee name updated 60 Roof Structure Replacement - Per 100 Sq Ft. or portion thereof after first 500 Sq. Ft. $73.00 Fee name updated
61 Residential Room Addition (Single Story) - First to 500 Sq Ft. $1,013.00 Fee name updated 62 Residential Room Addition (Single Story) - Per 100 Sq Ft. or portion thereof after first 500 Sq Ft. $129.00 Fee name updated 63 Residential Room Addition (Single Story with Structural Calculations) - First 500 Sq Ft. $1,307.00 Fee name updated

Page 3 of 4 ends

Proposed Building Amendments
64 Residential Room Addition (Single Story with Structural Calculations) - Per 100 Sq Ft. or portion thereof after first 500 Sq Ft.
$71.00 Fee name updated
65 Residential Room Addition (Multi Story) - First 500 Sq. Ft. $1,382.00 Fee name updated 66 Residential Room Addition (Multi Story) - Per 100 Sq. Ft. or portion thereof after first 500 Sq. Ft. $68.00 Fee name updated 67 Residential Room Addition (Multi Story with Structural Calculations) - First 500 Sq. Ft. $1,551.00 Fee name updated 68 Residential Room Addition (Multi Story with Structural Calculations) - Per 100 Sq. Ft. or portion thereof after first 500 Sq. Ft.
$132.00 Fee name updated
69 Sauna $457.00
70 Siding - First 400 Sq. Ft. $249.00 Fee name updated
71 Siding - Per 100 Sq. Ft. or portion thereof after first 400 Sq Ft. $61.00 Fee name updated 72 Storage Racking (taller than 5'9") - First 100 Sq Ft. $499.00 Fee name updated 73 Storage Racking (taller than 5'9") - Per 100 Sq Ft. or portion thereof after first 100 Sq Ft. $68.00 Fee name updated
74 Stucco - First 400 Sq Ft. $310.00 Fee name updated
75 Stucco - Per 100 Sq Ft. or portion thereof after first 400 Sq Ft. $68.00 Fee name updated 76 Residential Swimming Pool/Spa (Not Pre-Fabricated) - First 800 Sq Ft. $767.00 Fee name updated
77 Residential Swimming Pool/Spa (Not Pre-Fabricated) - Per 100 Sq. Ft. or portion thereof after first 800 Sq Ft. $71.00 Fee name updated 78 Commercial Swimming Pool/Spa (Not Pre-Fabricated) - First 800 Sq Ft. $852.00 Fee name updated
79 Commercial Swimming Pool/Spa (Not Pre-Fabricated) - Per 100 Sq Ft. or portion thereof after first 800 Sq Ft. $71.00 Fee name updated 80 New Window (Non-Structural) $501.00
81 New Window (Non-Structural) - Each additional window $68.00 Fee name updated 82 New Window/Sliding Glass Door (Structural) $585.00 Fee name updated 83 New Window (Structural) - Each additional window/sliding glass door $68.00 Fee name updated
84 Window Retrofit/Repair - First 10 Windows $273.00 Fee name updated 85 Window Retrofit/Repair - Each additional 5 windows after first 10 $61.00 Fee name updated 86 Standard Hourly Plan Check Rate $178.00 Fee name updated 87 Change of Contractor/Designer/Owner/ or Applicant $187.00 Fee name updated 88 Alternate Means or Methods Request/Research $228.00 Fee name updated 89 Mezzanine - First 500 Sq Ft. $583.00 Fee name updated 90 Mezzanine - Per 100 Sq Ft. or portion thereof after first 500 Sq Ft. $61.00 Fee name updated 91 Electrical Vehicle Charging Station - Residential $225.00 Fee name updated 92 Electrical Vehicle Charging Station - Commercial $304.00 Fee name updated 93 Electrical Vehicle Charging Station - Each additional charger $186.00 Fee name updated

Page 4 of 4 ends

Proposed Bldg Fees IA, IB Amd
IBC Class IBC Occupancy Square Footage Plan Check Fee
Inspection
Check Fee Total
A-1 Assembly—Fixed Seating 1,000 $1,609.29 plus $68.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,093.32 plus $19.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,702.61 plus $88.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Theater, Concert Hall 5,000 4,361.52 plus 64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 2,872.78 plus 15.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 7,234.30 plus 80.54 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 7,609.26 plus 40.27 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 3,652.23 plus 15.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 11,261.49 plus 55.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 11,636.45 plus 38.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 5,341.06 plus 13.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 16,977.51 plus 51.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 23,069.53 plus 36.63 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 6,321.64 plus 11.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 29,391.18 plus 48.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 41,386.77 plus 31.19 for each additional 100 s.f. or fraction thereof 12,297.48 plus 10.17 for each additional 100 s.f. or fraction thereof 53,684.24 plus 41.36 for each additional 100 s.f. or fraction thereof A-2 Assembly—Food & Drink 1,000 $2,087.58 plus $89.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,872.78 plus $29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,960.36 plus $118.56 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Restaurant, Night Club, Bar 5,000 5,660.62 plus 88.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,041.96 plus 26.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,702.58 plus 114.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 10,077.54 plus 53.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,081.24 plus 23.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 15,158.78 plus 76.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 15,403.83 plus 51.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,419.61 plus 20.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 22,823.43 plus 71.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 30,734.19 plus 48.85 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,789.92 plus 16.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 39,524.11 plus 65.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 55,157.17 plus 41.75 for each additional 100 s.f. or fraction thereof 17,234.04 plus 14.43 for each additional 100 s.f. or fraction thereof 72,391.20 plus 56.18 for each additional 100 s.f. or fraction thereof A-3 Assembly—Worship, Amusement 1,000 $2,087.58 plus $89.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,483.05 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,570.63 plus $115.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Arcade, Church, Community Hall 5,000 5,660.62 plus 88.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,522.32 plus 23.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,182.94 plus 111.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 10,077.54 plus 53.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,301.78 plus 20.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 14,379.32 plus 74.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 15,403.83 plus 51.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,380.33 plus 17.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 21,784.16 plus 68.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 30,734.19 plus 48.85 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 7,490.83 plus 14.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 38,225.02 plus 63.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 55,157.17 plus 41.75 for each additional 100 s.f. or fraction thereof 14,765.76 plus 12.44 for each additional 100 s.f. or fraction thereof 69,922.92 plus 54.18 for each additional 100 s.f. or fraction thereof A-4 Assembly—Indoor Sport Viewing 1,000 $2,217.49 plus $95.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,483.05 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,700.54 plus $121.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Arena, Skating Rink, Tennis Court 5,000 6,050.35 plus 90.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,522.32 plus 23.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,572.67 plus 114.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 10,597.18 plus 55.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,301.78 plus 20.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 14,898.96 plus 76.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 16,183.28 plus 54.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,380.33 plus 17.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 22,563.62 plus 71.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 32,423.01 plus 51.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 7,490.83 plus 14.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 39,913.84 plus 65.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 58,145.09 plus 29.42 for each additional 100 s.f. or fraction thereof 14,765.76 plus 8.32 for each additional 100 s.f. or fraction thereof 72,910.84 plus 37.74 for each additional 100 s.f. or fraction thereof A A Occupancy Tenant Improvements 400 $636.75 plus $67.68 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. $1,313.86 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. $1,950.62 plus $100.16 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 1,719.68 plus 64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 1,833.50 plus 27.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 3,553.18 plus 92.56 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 4,000 3,018.77 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 8000 s.f. 2,223.23 plus 22.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 8000 s.f. 5,242.00 plus 61.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 8000 s.f. 8,000 4,577.69 plus 36.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 3,132.60 plus 20.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 7,710.28 plus 57.04 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 8,994.61 plus 35.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 3,818.87 plus 17.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 12,813.48 plus 53.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 40,000 16,139.63 plus 29.42 for each additional 100 s.f. or fraction thereof 7,363.16 plus 14.59 for each additional 100 s.f. or fraction thereof 23,502.79 plus 44.02 for each additional 100 s.f. or fraction thereof B Business—Bank 100 $2,433.66 plus $1,104.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $1,573.68 plus $129.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $4,007.34 plus $1,234.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. 500 6,850.58 plus 1,039.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 2,093.32 plus 123.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 8,943.90 plus 1,162.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,000 12,046.96 plus 651.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,612.96 plus 116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 14,659.91 plus 768.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 18,564.26 plus 619.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,782.14 plus 100.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 22,346.40 plus 719.63 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 37,141.31 plus 595.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,468.42 plus 83.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 41,609.73 plus 679.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 66,934.22 plus 336.67 for each additional 100 s.f. or fraction thereof 8,662.25 plus 47.39 for each additional 100 s.f. or fraction thereof 75,596.48 plus 384.06 for each additional 100 s.f. or fraction thereof B Business—Clinic, Outpatient 100 $2,173.84 plus $1,006.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $1,573.68 plus $129.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $3,747.52 plus $1,136.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. 500 6,201.03 plus 961.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 2,093.32 plus 123.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 8,294.35 plus 1,084.74 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,000 11,007.68 plus 586.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,612.96 plus 116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 13,620.64 plus 703.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 16,875.43 plus 562.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,782.14 plus 100.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 20,657.58 plus 663.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 33,763.66 plus 543.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,468.42 plus 83.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 38,232.08 plus 627.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 60,958.39 plus 471.31 for each additional 100 s.f. or fraction thereof 8,662.25 plus 72.68 for each additional 100 s.f. or fraction thereof 69,620.64 plus 543.99 for each additional 100 s.f. or fraction thereof B Business—Dry Cleaning 500 $1,113.79 plus $90.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,742.87 plus $58.46 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,856.65 plus $149.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 2,932.52 plus 88.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,912.05 plus 52.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 6,844.57 plus 140.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 5,140.98 plus 51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,821.42 plus 46.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,962.40 plus 98.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 7,739.17 plus 51.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 7,159.79 plus 39.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 14,898.96 plus 90.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 15,403.83 plus 48.85 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 8,365.70 plus 32.36 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 23,769.53 plus 81.21 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 27,615.31 plus 28.47 for each additional 100 s.f. or fraction thereof 16,456.82 plus 18.87 for each additional 100 s.f. or fraction thereof 44,072.13 plus 47.34 for each additional 100 s.f. or fraction thereof B Business—Professional Office 1,000 $2,303.75 plus $103.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,522.32 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $5,826.07 plus $136.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 6,460.85 plus 101.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,821.42 plus 30.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 11,282.27 plus 131.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 11,527.32 plus 61.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 6,120.51 plus 28.58 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 17,647.83 plus 89.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 17,633.06 plus 58.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 8,978.52 plus 24.46 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 26,611.58 plus 83.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 35,322.57 plus 56.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 10,574.17 plus 20.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 45,896.74 plus 76.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 63,642.83 plus 32.27 for each additional 100 s.f. or fraction thereof 20,743.83 plus 11.59 for each additional 100 s.f. or fraction thereof 84,386.67 plus 43.85 for each additional 100 s.f. or fraction thereof B Business—High Rise Office 5,000 $6,872.40 plus $18.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. $13,395.44 plus $19.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. $20,267.85 plus $38.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 10,639.78 plus 52.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 17,292.73 plus 17.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 27,932.51 plus 69.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 23,674.38 plus 42.09 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 23,788.20 plus 15.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 47,462.58 plus 57.16 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 44,719.71 plus 38.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 250000 s.f. 31,322.95 plus 15.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 250000 s.f. 76,042.66 plus 53.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 250000 s.f. 250,000 89,192.39 plus 35.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500000 s.f. 43,476.87 plus 14.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500000 s.f. 132,669.26 plus 50.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500000 s.f. 500,000 177,531.87 plus 34.05 for each additional 100 s.f. or fraction thereof 80,963.13 plus 14.45 for each additional 100 s.f. or fraction thereof 258,495.00 plus 48.50 for each additional 100 s.f. or fraction thereof B B Occupancy Tenant Improvements 250 $485.01 plus $64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1250 s.f. $1,183.95 plus $38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1250 s.f. $1,668.97 plus $103.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1250 s.f. 1,250 1,134.56 plus 72.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 1,573.68 plus 37.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,708.25 plus 110.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 2,043.93 plus 41.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 1,833.50 plus 36.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,877.43 plus 77.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 3,083.20 plus 40.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12500 s.f. 2,742.87 plus 30.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12500 s.f. 5,826.07 plus 71.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12500 s.f. 12,500 6,136.60 plus 38.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 3,169.33 plus 24.20 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 9,305.93 plus 62.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 10,943.25 plus 30.75 for each additional 100 s.f. or fraction thereof 6,193.97 plus 19.35 for each additional 100 s.f. or fraction thereof 17,137.22 plus 50.10 for each additional 100 s.f. or fraction thereof E Educational—Group Occupancy 500 $1,416.21 plus $116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $1,927.80 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,344.01 plus $149.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 6+ persons, up to the 12th Grade 2,500 3,754.58 plus 116.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 2,577.35 plus 31.83 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 6,331.93 plus 147.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 6,656.24 plus 70.15 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,262.51 plus 31.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,918.75 plus 101.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 10,163.79 plus 67.27 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 4,821.42 plus 26.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 14,985.21 plus 93.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 20,254.13 plus 64.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 5,673.22 plus 22.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 25,927.34 plus 86.90 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 36,450.21 plus 54.13 for each additional 100 s.f. or fraction thereof 11,201.75 plus 18.48 for each additional 100 s.f. or fraction thereof 47,651.96 plus 72.60 for each additional 100 s.f. or fraction thereof E Educational—Day Care 300 $1,026.48 plus $129.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. $1,927.80 plus $54.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. $2,954.28 plus $184.04 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. 5+ children, older than 2 1/2 yrs 1,500 2,585.39 plus 132.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 2,577.35 plus 53.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 5,162.74 plus 185.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 3,000 4,577.69 plus 82.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 3,262.51 plus 51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 7,840.19 plus 134.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f.

BUILDING PERMIT FEES - CONSTRUCTION TYPES: IA, IB
New Construction Fee Schedule

Page 9 of 21 ends

Staff proposes that the Building Permit Fees be updated to read as follows. The version of the building permit fees that was last approved by Council is unclear on units and fractional costs in places; this revision remedies those errors.

Page 653 of 833 ends

Proposed Bldg Fees IA, IB Amd
6,000 7,045.97 plus 77.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 4,821.42 plus 44.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 11,867.39 plus 121.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 15,000 14,018.48 plus 75.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 5,673.22 plus 36.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 19,691.69 plus 111.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 25,277.99 plus 61.66 for each additional 100 s.f. or fraction thereof 11,201.75 plus 30.27 for each additional 100 s.f. or fraction thereof 36,479.75 plus 91.93 for each additional 100 s.f. or fraction thereof F-1 Factory Industrial—Moderate Hazard 1,500 $2,499.14 plus $60.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7500 s.f. $2,872.78 plus $12.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7500 s.f. $5,371.91 plus $72.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7500 s.f. 7,500 3,798.23 plus 59.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 3,652.23 plus 11.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 7,450.47 plus 70.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 15,000 8,258.81 plus 47.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 4,986.94 plus 9.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 13,245.74 plus 57.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 15,447.48 plus 44.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 75000 s.f. 6,415.94 plus 9.51 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 75000 s.f. 21,863.42 plus 53.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 75000 s.f. 75,000 30,690.54 plus 40.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 150000 s.f. 8,956.56 plus 9.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 150000 s.f. 39,647.10 plus 49.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 150000 s.f. 150,000 60,873.18 plus 37.57 for each additional 100 s.f. or fraction thereof 16,528.04 plus 8.78 for each additional 100 s.f. or fraction thereof 77,401.22 plus 46.35 for each additional 100 s.f. or fraction thereof F-2 Factory Industrial—Low Hazard 2,000 $2,629.05 plus $56.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. $5,600.88 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. $8,229.92 plus $82.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 7,175.88 plus 56.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 7,679.43 plus 24.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 14,855.30 plus 80.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 12,805.64 plus 34.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 9,923.50 plus 22.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 22,729.13 plus 56.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 40,000 19,734.49 plus 32.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 14,340.42 plus 19.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 34,074.91 plus 51.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 39,264.56 plus 31.35 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 200000 s.f. 16,881.04 plus 16.54 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 200000 s.f. 56,145.60 plus 47.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 200000 s.f. 200,000 70,616.39 plus 26.96 for each additional 100 s.f. or fraction thereof 33,416.27 plus 14.22 for each additional 100 s.f. or fraction thereof 104,032.66 plus 41.18 for each additional 100 s.f. or fraction thereof H-1 High Hazard Group H-1 600 $810.31 plus $46.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $1,833.50 plus $27.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $2,643.82 plus $74.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f.

Pose a detonation hazard 3,000 1,936.90 plus 37.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 2,483.05 plus 25.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 4,419.95 plus 63.35 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,000 3,409.55 plus 28.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 3,132.60 plus 23.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 6,542.15 plus 52.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 12,000 5,142.03 plus 26.70 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 4,561.60 plus 20.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 9,703.63 plus 47.12 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 9,948.68 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 5,449.01 plus 17.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 15,397.69 plus 42.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 60,000 17,743.25 plus 21.13 for each additional 100 s.f. or fraction thereof 10,552.20 plus 13.84 for each additional 100 s.f. or fraction thereof 28,295.45 plus 34.97 for each additional 100 s.f. or fraction thereof H-3 High Hazard Group H-3 600 $1,200.04 plus $79.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $2,612.96 plus $43.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $3,813.00 plus $122.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f.

Readily support combustion 3,000 3,106.08 plus 75.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 3,652.23 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,758.32 plus 114.04 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,000 5,358.20 plus 46.20 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 4,691.51 plus 34.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 10,049.71 plus 80.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 12,000 8,129.95 plus 43.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 6,770.06 plus 30.16 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 14,900.01 plus 73.46 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 15,924.51 plus 41.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 8,047.20 plus 25.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 23,971.71 plus 67.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 60,000 28,395.82 plus 34.04 for each additional 100 s.f. or fraction thereof 15,748.58 plus 21.02 for each additional 100 s.f. or fraction thereof 44,144.40 plus 55.06 for each additional 100 s.f. or fraction thereof H-4 High Hazard Group H-4 300 $550.50 plus $72.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. $1,703.59 plus $54.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. $2,254.09 plus $126.36 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f.

Pose health hazards 1,500 1,417.26 plus 72.20 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 2,353.14 plus 48.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 3,770.40 plus 120.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 3,000 2,500.19 plus 40.43 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 3,002.69 plus 43.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 5,502.87 plus 83.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,000 3,713.03 plus 37.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 4,301.78 plus 37.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 8,014.81 plus 75.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 15,000 7,090.67 plus 36.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 5,189.19 plus 32.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 12,279.86 plus 68.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 12,546.87 plus 28.73 for each additional 100 s.f. or fraction thereof 10,032.57 plus 25.50 for each additional 100 s.f. or fraction thereof 22,579.44 plus 54.23 for each additional 100 s.f. or fraction thereof H-5 High Hazard Group H-5 1,000 $1,329.95 plus $54.15 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,262.51 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,592.46 plus $86.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Semiconductor Fabrication, R&D 5,000 3,495.81 plus 50.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,561.60 plus 29.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,057.41 plus 80.12 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,007.74 plus 31.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,600.88 plus 27.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 11,608.62 plus 58.90 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 9,169.22 plus 29.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 8,328.97 plus 23.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 17,498.20 plus 52.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 18,003.07 plus 28.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 9,865.93 plus 18.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 27,868.99 plus 47.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 32,163.20 plus 23.54 for each additional 100 s.f. or fraction thereof 19,256.14 plus 15.61 for each additional 100 s.f. or fraction thereof 51,419.33 plus 39.15 for each additional 100 s.f. or fraction thereof I-1 Institutional—17+ persons, ambulatory 1,000 $2,412.88 plus $100.68 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,782.14 plus $38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $6,195.02 plus $139.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 6,440.07 plus 98.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 5,341.06 plus 35.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 11,781.13 plus 133.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 11,376.63 plus 61.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 6,770.06 plus 31.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 18,146.69 plus 92.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 17,526.03 plus 57.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 9,887.89 plus 26.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 27,413.92 plus 84.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 34,803.99 plus 55.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 11,649.05 plus 22.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 46,453.04 plus 78.19 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 62,691.92 plus 47.81 for each additional 100 s.f. or fraction thereof 22,857.99 plus 19.22 for each additional 100 s.f. or fraction thereof 85,549.91 plus 67.03 for each additional 100 s.f. or fraction thereof I-2 Institutional—6+ persons, non-ambulatory 1,000 $2,672.70 plus $113.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,691.51 plus $48.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $7,364.21 plus $162.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 7,219.53 plus 111.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 6,640.15 plus 43.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 13,859.68 plus 155.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 12,805.64 plus 69.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 8,328.97 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 21,134.61 plus 108.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 19,734.49 plus 64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 12,226.26 plus 33.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 31,960.75 plus 98.51 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 39,220.91 plus 62.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 14,507.06 plus 28.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 53,727.97 plus 90.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 70,616.39 plus 53.54 for each additional 100 s.f. or fraction thereof 28,574.01 plus 23.99 for each additional 100 s.f. or fraction thereof 99,190.40 plus 77.53 for each additional 100 s.f. or fraction thereof M Mercantile—Department & Drug Store 1,000 $1,546.12 plus $64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,742.87 plus $29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,288.99 plus $94.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 4,144.31 plus 63.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,912.05 plus 26.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,056.36 plus 89.54 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 7,305.79 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,821.42 plus 23.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,127.21 plus 62.36 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 11,203.07 plus 37.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,159.79 plus 19.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 18,362.86 plus 57.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 22,332.68 plus 35.60 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,436.92 plus 16.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 30,769.60 plus 52.04 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 40,130.27 plus 30.18 for each additional 100 s.f. or fraction thereof 16,657.95 plus 13.94 for each additional 100 s.f. or fraction thereof 56,788.22 plus 44.12 for each additional 100 s.f. or fraction thereof M Mercantile—Market 500 $896.57 plus $71.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,483.05 plus $45.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,379.62 plus $116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 2,325.57 plus 69.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,392.42 plus 42.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,717.99 plus 111.52 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 4,058.05 plus 44.17 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,301.78 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,359.83 plus 83.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,266.51 plus 41.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 6,250.42 plus 33.85 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 12,516.93 plus 75.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 12,459.56 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,397.65 plus 28.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 19,857.21 plus 67.70 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 22,202.77 plus 32.51 for each additional 100 s.f. or fraction thereof 14,579.40 plus 23.96 for each additional 100 s.f. or fraction thereof 36,782.17 plus 56.47 for each additional 100 s.f. or fraction thereof M Mercantile—Motor fuel-dispensing 100 $2,196.72 plus $909.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $3,333.73 plus $324.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $5,530.44 plus $1,234.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. 500 5,834.18 plus 883.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 4,632.82 plus 298.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 10,467.00 plus 1,182.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,000 10,251.10 plus 532.63 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 5,802.00 plus 272.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 16,053.11 plus 805.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 15,577.39 plus 518.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 8,530.10 plus 232.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 24,107.49 plus 751.12 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 31,123.92 plus 492.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,138.28 plus 193.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 41,262.20 plus 685.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 55,764.11 plus 425.20 for each additional 100 s.f. or fraction thereof 19,788.30 plus 166.52 for each additional 100 s.f. or fraction thereof 75,552.42 plus 591.72 for each additional 100 s.f. or fraction thereof M M Occupancy Tenant Improvements 500 $766.66 plus $58.46 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $1,833.50 plus $38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,600.16 plus $97.43 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 1,935.85 plus 63.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 2,612.96 plus 33.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 4,548.80 plus 97.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 3,516.59 plus 36.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,262.51 plus 28.58 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 6,779.09 plus 64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 5,335.32 plus 34.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 4,691.51 plus 25.02 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 10,026.83 plus 59.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 10,553.52 plus 33.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 5,507.70 plus 21.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 16,061.22 plus 54.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 18,867.73 plus 27.67 for each additional 100 s.f. or fraction thereof 10,870.71 plus 17.85 for each additional 100 s.f. or fraction thereof 29,738.44 plus 45.52 for each additional 100 s.f. or fraction thereof R-1 Residential—Transient 1,000 $1,935.85 plus $87.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,909.51 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,845.35 plus $113.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Boarding Houses, Hotels, Motels 5,000 5,443.40 plus 84.02 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,948.78 plus 24.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,392.18 plus 108.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 9,644.16 plus 50.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,988.06 plus 22.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 14,632.22 plus 72.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 14,710.63 plus 49.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,196.52 plus 19.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 21,907.14 plus 68.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 29,477.70 plus 47.20 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,566.83 plus 16.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 38,044.53 plus 63.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 53,078.62 plus 40.35 for each additional 100 s.f. or fraction thereof 16,751.13 plus 13.99 for each additional 100 s.f. or fraction thereof 69,829.75 plus 54.35 for each additional 100 s.f. or fraction thereof

Page 10 of 21 ends

Proposed Bldg Fees IA, IB Amd
R-2 Residential—Permanent, 2+ Dwellings 1,000 $2,154.11 plus $81.19 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,814.09 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,968.20 plus $107.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Apartment, Dormitory, Timeshare 5,000 5,401.85 plus 80.54 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,853.36 plus 24.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,255.21 plus 104.58 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 9,429.04 plus 50.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,762.73 plus 22.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 14,191.77 plus 72.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 14,452.91 plus 39.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,971.19 plus 19.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 21,424.10 plus 58.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 36,407.60 plus 29.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,177.10 plus 15.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 44,584.71 plus 45.54 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 51,217.28 plus 25.38 for each additional 100 s.f. or fraction thereof 16,138.31 plus 13.65 for each additional 100 s.f. or fraction thereof 67,355.59 plus 39.03 for each additional 100 s.f. or fraction thereof R-2 Residential—Permanent, 2+, Repeat 1,000 $984.93 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,684.18 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,669.11 plus $51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Apartment, Dormitory, Timeshare 5,000 2,024.20 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,723.45 plus 20.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 5,747.66 plus 46.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 3,323.30 plus 17.76 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,762.73 plus 20.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 8,086.03 plus 38.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 5,099.43 plus 15.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,841.28 plus 18.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 11,940.71 plus 33.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 9,776.17 plus 15.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,047.20 plus 15.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 17,823.36 plus 30.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 17,310.92 plus 12.25 for each additional 100 s.f. or fraction thereof 15,878.49 plus 12.73 for each additional 100 s.f. or fraction thereof 33,189.41 plus 24.98 for each additional 100 s.f. or fraction thereof R-3 Dwellings—Custom Homes 1,500 $3,106.08 plus $103.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,612.96 plus $64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $5,719.04 plus $168.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 4,145.36 plus 118.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 3,262.51 plus 51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 7,407.86 plus 170.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 4,000 5,921.49 plus 116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,652.23 plus 45.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 9,573.72 plus 162.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 7,090.67 plus 106.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 3,912.05 plus 42.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 11,002.72 plus 148.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 7,000 9,212.88 plus 105.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,502.91 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 13,715.79 plus 144.36 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 12,374.36 plus 79.41 for each additional 100 s.f. or fraction thereof 5,672.10 plus 29.37 for each additional 100 s.f. or fraction thereof 18,046.45 plus 108.78 for each additional 100 s.f. or fraction thereof R-3 Dwellings—Production Phase 1,500 $1,287.35 plus $38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $1,906.96 plus $51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,194.31 plus $90.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. of Master Plan (repeats) 2,500 1,677.08 plus 38.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 2,426.60 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 4,103.68 plus 77.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 4,000 2,284.02 plus 37.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 2,686.42 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 4,970.44 plus 63.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 2,673.75 plus 37.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 2,946.24 plus 22.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 5,619.99 plus 60.52 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 7,000 3,496.86 plus 36.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,277.28 plus 21.27 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 6,774.14 plus 57.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 4,579.79 plus 23.35 for each additional 100 s.f. or fraction thereof 4,186.64 plus 13.76 for each additional 100 s.f. or fraction thereof 8,766.43 plus 37.11 for each additional 100 s.f. or fraction thereof R-3 Dwellings—Alternate Materials 1,500 $2,196.72 plus $90.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,002.69 plus $77.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $5,199.40 plus $168.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 3,106.08 plus 83.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 3,782.14 plus 58.46 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 6,888.22 plus 142.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 4,000 4,362.57 plus 77.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 4,171.87 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 8,534.45 plus 116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 5,142.03 plus 76.51 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 4,561.60 plus 36.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 9,703.63 plus 112.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7000 s.f. 7,000 6,744.60 plus 75.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 5,152.46 plus 35.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 11,897.05 plus 110.20 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 8,996.71 plus 53.11 for each additional 100 s.f. or fraction thereof 6,581.46 plus 24.85 for each additional 100 s.f. or fraction thereof 15,578.17 plus 77.96 for each additional 100 s.f. or fraction thereof R-4 Residential—Assisted Living (6-16 persons) 1,000 $2,217.49 plus $94.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,402.86 plus $67.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,620.35 plus $162.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 5,984.87 plus 91.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 5,117.97 plus 48.27 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 11,102.83 plus 139.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 10,553.52 plus 55.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 6,417.06 plus 28.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 16,970.59 plus 84.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 16,139.63 plus 53.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 9,275.07 plus 24.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 25,414.70 plus 78.70 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 32,292.05 plus 51.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 11,035.11 plus 21.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 43,327.17 plus 72.58 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 58,057.78 plus 44.12 for each additional 100 s.f. or fraction thereof 21,557.78 plus 18.02 for each additional 100 s.f. or fraction thereof 79,615.56 plus 62.14 for each additional 100 s.f. or fraction thereof S-1 Storage—Moderate Hazard 1,000 $810.31 plus $34.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,262.51 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,072.82 plus $67.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 2,196.72 plus 34.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,561.60 plus 29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 6,758.32 plus 63.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 3,929.19 plus 18.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,730.79 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 9,659.98 plus 44.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 5,791.58 plus 18.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 8,328.97 plus 22.51 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 14,120.55 plus 41.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 11,377.68 plus 17.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 9,865.93 plus 19.04 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 21,243.61 plus 36.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 20,211.53 plus 14.65 for each additional 100 s.f. or fraction thereof 19,386.05 plus 15.79 for each additional 100 s.f. or fraction thereof 39,597.57 plus 30.45 for each additional 100 s.f. or fraction thereof S-1 Storage—Moderate Hazard, Repair Garage 500 $940.22 plus $69.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,223.23 plus $45.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,163.45 plus $114.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f.

Motor Vehicles (not High Hazard) 2,500 2,326.62 plus 64.10 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,132.60 plus 39.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,459.22 plus 103.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 3,929.19 plus 39.85 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,912.05 plus 33.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 7,841.24 plus 73.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 5,921.49 plus 38.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 5,600.88 plus 29.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 11,522.36 plus 67.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 11,637.50 plus 36.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,748.10 plus 25.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 18,385.60 plus 61.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 20,731.16 plus 30.40 for each additional 100 s.f. or fraction thereof 13,150.39 plus 21.41 for each additional 100 s.f. or fraction thereof 33,881.56 plus 51.81 for each additional 100 s.f. or fraction thereof S-2 Storage—Low Hazard 1,000 $940.22 plus $34.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,002.69 plus $25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,942.91 plus $60.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 2,326.62 plus 29.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,041.96 plus 25.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 6,368.59 plus 54.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 4,578.74 plus 23.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,081.24 plus 24.68 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 9,659.98 plus 48.50 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 6,960.76 plus 22.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,549.52 plus 20.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 14,510.28 plus 42.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 13,586.14 plus 21.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,956.56 plus 16.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 22,542.71 plus 38.27 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 24,238.72 plus 17.91 for each additional 100 s.f. or fraction thereof 17,437.41 plus 14.26 for each additional 100 s.f. or fraction thereof 41,676.12 plus 32.17 for each additional 100 s.f. or fraction thereof S-2 Storage—Low Hazard, Parking Garages 1,000 $918.40 plus $36.27 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,612.96 plus $22.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,531.36 plus $59.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Open or Enclosed 5,000 2,369.23 plus 29.40 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,522.32 plus 21.76 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 5,891.55 plus 51.16 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 4,187.96 plus 22.52 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,467.30 plus 20.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 8,655.26 plus 43.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 6,440.07 plus 20.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,545.85 plus 17.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 12,985.93 plus 38.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 12,719.38 plus 20.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 7,787.38 plus 15.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 20,506.76 plus 35.21 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 22,809.72 plus 16.96 for each additional 100 s.f. or fraction thereof 15,300.16 plus 12.63 for each additional 100 s.f. or fraction thereof 38,109.88 plus 29.59 for each additional 100 s.f. or fraction thereof Other Tenant Improvements 600 $896.57 plus $54.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $1,963.41 plus $27.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $2,859.98 plus $81.19 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 3,000 2,195.66 plus 44.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 2,612.96 plus 26.52 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 4,808.62 plus 70.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,000 3,884.49 plus 34.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 3,262.51 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 7,146.99 plus 60.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 12,000 5,963.04 plus 32.60 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 4,821.42 plus 22.15 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 10,784.46 plus 54.74 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 11,830.79 plus 31.68 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 5,637.61 plus 18.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 17,468.40 plus 49.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 60,000 21,336.01 plus 26.55 for each additional 100 s.f. or fraction thereof 11,130.53 plus 15.34 for each additional 100 s.f. or fraction thereof 32,466.54 plus 41.89 for each additional 100 s.f. or fraction thereof B Shell Bldg: Business—Professional Office 1,000 $1,438.03 plus $62.25 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,132.60 plus $29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,570.63 plus $91.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 3,928.14 plus 59.76 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,301.78 plus 26.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,229.92 plus 86.71 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,916.06 plus 38.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,376.67 plus 24.68 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,292.72 plus 62.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 10,727.09 plus 35.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,844.95 plus 21.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 18,572.03 plus 56.50 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 21,293.40 plus 33.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 9,346.29 plus 17.88 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 30,639.69 plus 51.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 38,139.03 plus 28.77 for each additional 100 s.f. or fraction thereof 18,288.08 plus 15.27 for each additional 100 s.f. or fraction thereof 56,427.11 plus 44.04 for each additional 100 s.f. or fraction thereof Other Shell Building 1,000 $1,308.13 plus $59.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,262.51 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,570.63 plus $91.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 3,668.32 plus 54.56 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,561.60 plus 29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,229.92 plus 83.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,396.42 plus 34.21 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,766.40 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,162.82 plus 60.19 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 9,817.72 plus 32.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 8,364.58 plus 22.58 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 18,182.30 plus 55.21 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 19,604.58 plus 31.09 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 9,995.84 plus 19.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 29,600.42 plus 50.28 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 35,151.11 plus 26.55 for each additional 100 s.f. or fraction thereof 19,587.18 plus 16.38 for each additional 100 s.f. or fraction thereof 54,738.29 plus 42.94 for each additional 100 s.f. or fraction thereof

Page 11 of 21 ends

Proposed Bldg. Fees IIA - III
IBC Class IBC Occupancy Square Footage Plan Check Fee
Inspection
Check Fee Total
A-1 Assembly—Fixed Seating 1,000 $1,349.47 plus $55.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $1,833.50 plus $16.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,182.98 plus $72.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Theater, Concert Hall 5,000 3,582.07 plus 54.56 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 2,483.05 plus 12.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 6,065.11 plus 67.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,310.16 plus 33.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 3,132.60 plus 12.99 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 9,442.76 plus 46.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 9,687.81 plus 32.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 4,431.69 plus 11.56 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 14,119.50 plus 43.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 19,302.16 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 5,282.37 plus 10.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 24,584.53 plus 36.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 32,293.10 plus 22.12 for each additional 100 s.f. or fraction thereof 10,348.84 plus 8.63 for each additional 100 s.f. or fraction thereof 42,641.94 plus 30.74 for each additional 100 s.f. or fraction thereof A-2 Assembly—Food & Drink 1,000 $1,697.85 plus $76.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,483.05 plus $22.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,180.90 plus $99.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Restaurant, Night Club, Bar 5,000 4,751.25 plus 72.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,392.42 plus 21.11 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,143.67 plus 93.86 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 8,388.72 plus 44.17 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 4,301.78 plus 19.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,690.50 plus 63.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 12,805.64 plus 42.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 6,250.42 plus 16.76 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 19,056.06 plus 59.63 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 25,667.72 plus 40.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 7,360.92 plus 14.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 33,028.64 plus 54.56 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 45,933.60 plus 34.64 for each additional 100 s.f. or fraction thereof 14,376.03 plus 11.99 for each additional 100 s.f. or fraction thereof 60,309.63 plus 46.63 for each additional 100 s.f. or fraction thereof A-3 Assembly—Worship, Amusement 1,000 $1,697.85 plus $76.33 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,093.32 plus $19.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,791.17 plus $95.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Arcade, Church, Community Hall 5,000 4,751.25 plus 72.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 2,872.78 plus 15.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 7,624.03 plus 88.34 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 8,388.72 plus 44.17 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 3,652.23 plus 16.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,040.95 plus 61.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 12,805.64 plus 42.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 5,341.06 plus 14.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 18,146.69 plus 57.29 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 25,667.72 plus 40.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 6,321.64 plus 11.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 31,989.37 plus 52.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 45,933.60 plus 34.64 for each additional 100 s.f. or fraction thereof 12,297.48 plus 10.22 for each additional 100 s.f. or fraction thereof 58,231.07 plus 44.86 for each additional 100 s.f. or fraction thereof A-4 Assembly—Indoor Sport Viewing 1,000 $1,827.76 plus $79.58 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,093.32 plus $19.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $3,921.08 plus $99.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f.

Arena, Skating Rink, Tennis Court 5,000 5,011.07 plus 77.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 2,872.78 plus 18.19 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 7,883.85 plus 96.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 8,908.35 plus 46.77 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 3,652.23 plus 16.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,560.59 plus 63.66 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 13,585.09 plus 44.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 5,341.06 plus 14.42 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 18,926.15 plus 59.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 26,966.82 plus 43.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 6,321.64 plus 11.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 33,288.46 plus 55.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 48,531.79 plus 36.93 for each additional 100 s.f. or fraction thereof 12,297.48 plus 10.23 for each additional 100 s.f. or fraction thereof 60,829.26 plus 47.16 for each additional 100 s.f. or fraction thereof A A Occupancy Tenant Improvements 400 $636.75 plus $51.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. $1,054.05 plus $24.36 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. $1,690.80 plus $75.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 1,459.86 plus 51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 1,443.77 plus 23.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 2,903.63 plus 75.51 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 4000 s.f. 4,000 2,499.14 plus 32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 8000 s.f. 1,833.50 plus 22.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 8000 s.f. 4,332.64 plus 55.21 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 8000 s.f. 8,000 3,798.23 plus 31.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 2,742.87 plus 18.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 6,541.10 plus 50.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 7,565.61 plus 29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 3,169.33 plus 15.12 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 10,734.93 plus 44.35 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 40,000 13,411.53 plus 24.07 for each additional 100 s.f. or fraction thereof 6,193.97 plus 12.45 for each additional 100 s.f. or fraction thereof 19,605.50 plus 36.53 for each additional 100 s.f. or fraction thereof B Business—Bank 100 $2,043.93 plus $909.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $1,313.86 plus $97.43 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $3,357.79 plus $1,006.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. 500 5,681.39 plus 883.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,703.59 plus 94.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 7,384.99 plus 977.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,000 10,098.31 plus 534.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,223.23 plus 90.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 12,321.54 plus 625.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 15,446.43 plus 515.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,132.60 plus 80.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 18,579.02 plus 596.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 30,905.65 plus 497.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,688.96 plus 70.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 34,594.62 plus 568.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 55,762.01 plus 432.49 for each additional 100 s.f. or fraction thereof 7,233.25 plus 61.67 for each additional 100 s.f. or fraction thereof 62,995.26 plus 494.16 for each additional 100 s.f. or fraction thereof B Business—Clinic, Outpatient 100 $1,914.02 plus $811.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $1,313.86 plus $97.43 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. $3,227.88 plus $909.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500 s.f. 500 5,161.76 plus 805.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,703.59 plus 94.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 6,865.35 plus 899.62 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1000 s.f. 1,000 9,188.95 plus 495.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,223.23 plus 90.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 11,412.18 plus 586.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2000 s.f. 2,000 14,147.33 plus 467.67 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,132.60 plus 80.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 17,279.93 plus 548.59 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 28,177.55 plus 452.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 3,688.96 plus 70.89 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 31,866.52 plus 523.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 50,825.45 plus 392.51 for each additional 100 s.f. or fraction thereof 7,233.25 plus 61.43 for each additional 100 s.f. or fraction thereof 58,058.70 plus 453.94 for each additional 100 s.f. or fraction thereof B Business—Dry Cleaning 500 $983.88 plus $77.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,353.14 plus $45.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $3,337.02 plus $123.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 2,542.79 plus 72.75 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,262.51 plus 42.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,805.30 plus 114.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 4,361.52 plus 44.17 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,041.96 plus 38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,403.49 plus 83.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,569.98 plus 41.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 5,990.60 plus 33.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 12,560.59 plus 74.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 12,805.64 plus 41.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,066.61 plus 27.17 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 19,872.25 plus 68.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 23,068.48 plus 34.24 for each additional 100 s.f. or fraction thereof 13,858.63 plus 22.66 for each additional 100 s.f. or fraction thereof 36,927.11 plus 56.91 for each additional 100 s.f. or fraction thereof BUILDING PERMIT FEES - CONSTRUCTION TYPES: IIA, IIB, IIIA, IIIB, IV New Construction Fee Schedule

Page 9 of 21 ends

Proposed Bldg. Fees IIA - III
IBC Class IBC Occupancy Square Footage Plan Check Fee
Inspection
Check Fee Total
BUILDING PERMIT FEES - CONSTRUCTION TYPES: IIA, IIB, IIIA, IIIB, IV New Construction Fee Schedule
B Business—Professional Office 1,000 $1,914.02 plus $87.69 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $2,872.78 plus $29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. $4,786.80 plus $116.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 5,421.57 plus 83.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 4,041.96 plus 26.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 9,463.54 plus 109.45 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 9,578.68 plus 51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 5,081.24 plus 23.38 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 14,659.91 plus 75.35 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 14,775.05 plus 49.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 7,419.61 plus 20.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 22,194.66 plus 69.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 29,476.65 plus 47.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 8,755.43 plus 17.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 38,232.08 plus 64.25 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 52,990.26 plus 40.48 for each additional 100 s.f. or fraction thereof 17,366.19 plus 14.82 for each additional 100 s.f. or fraction thereof 70,356.45 plus 55.30 for each additional 100 s.f. or fraction thereof B Business—High Rise Office 5,000 $5,833.13 plus $14.94 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. $11,186.98 plus $16.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. $17,020.11 plus $31.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 8,821.05 plus 43.82 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 14,434.72 plus 14.35 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 23,255.77 plus 58.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 19,777.09 plus 35.08 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 19,890.92 plus 12.47 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 39,668.01 plus 47.55 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 37,314.87 plus 32.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 250000 s.f. 26,126.57 plus 12.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 250000 s.f. 63,441.44 plus 44.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 250000 s.f. 250,000 74,382.72 plus 29.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500000 s.f. 36,331.85 plus 12.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500000 s.f. 110,714.56 plus 41.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 500000 s.f. 500,000 147,912.52 plus 28.34 for each additional 100 s.f. or fraction thereof 67,582.45 plus 11.56 for each additional 100 s.f. or fraction thereof 215,494.97 plus 39.91 for each additional 100 s.f. or fraction thereof B B Occupancy Tenant Improvements 250 $355.11 plus $64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1250 s.f. $888.53 plus $38.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1250 s.f. $1,243.63 plus $103.93 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1250 s.f. 1,250 1,004.65 plus 51.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 1,278.25 plus 32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,282.91 plus 84.44 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 2,500 1,654.20 plus 36.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 1,538.07 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 3,192.27 plus 62.36 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 2,563.57 plus 33.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12500 s.f. 2,187.62 plus 23.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12500 s.f. 4,751.19 plus 56.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12500 s.f. 12,500 5,097.33 plus 32.22 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 2,649.69 plus 20.04 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 7,747.01 plus 52.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 9,124.52 plus 25.77 for each additional 100 s.f. or fraction thereof 5,154.70 plus 16.03 for each additional 100 s.f. or fraction thereof 14,279.22 plus 41.79 for each additional 100 s.f. or fraction thereof E Educational—Group Occupancy 500 $1,156.39 plus $97.43 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $1,538.07 plus $32.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. $2,694.46 plus $129.91 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 2500 s.f. 6+ persons, up to the 12th Grade 2,500 3,105.03 plus 77.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 2,187.62 plus 29.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,292.65 plus 106.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 5000 s.f. 5,000 5,616.96 plus 57.16 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 2,742.87 plus 25.98 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 8,359.83 plus 83.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 8,474.97 plus 56.01 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 4,041.96 plus 22.23 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 12,516.93 plus 78.24 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 25000 s.f. 25,000 16,876.48 plus 54.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 4,763.85 plus 18.48 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 21,640.33 plus 72.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 50000 s.f. 50,000 30,474.37 plus 45.44 for each additional 100 s.f. or fraction thereof 9,383.02 plus 15.44 for each additional 100 s.f. or fraction thereof 39,857.39 plus 60.88 for each additional 100 s.f. or fraction thereof E Educational—Day Care 300 $896.57 plus $108.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. $1,538.07 plus $54.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. $2,434.64 plus $162.39 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 1500 s.f. 5+ children, older than 2 1/2 yrs 1,500 2,195.66 plus 86.61 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 2,187.62 plus 48.72 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 4,383.29 plus 135.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. 3,000 3,928.14 plus 64.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 2,742.87 plus 43.30 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,671.01 plus 108.26 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,000 5,876.78 plus 65.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 4,041.96 plus 37.05 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 9,918.75 plus 102.97 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 15,000 11,810.01 plus 62.07 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 4,763.85 plus 30.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 16,573.86 plus 92.87 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 21,120.89 plus 50.99 for each additional 100 s.f. or fraction thereof 9,383.02 plus 25.29 for each additional 100 s.f. or fraction thereof 30,503.91 plus 76.28 for each additional 100 s.f. or fraction thereof F-1 Factory Industrial—Moderate Hazard 1,500 $2,109.41 plus $51.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7500 s.f. $2,353.14 plus $10.83 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7500 s.f. $4,462.55 plus $61.83 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 7500 s.f. 7,500 3,148.68 plus 50.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 3,002.69 plus 9.31 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 6,151.37 plus 60.12 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 15000 s.f. 15,000 6,959.71 plus 40.13 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 4,207.48 plus 7.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 11,167.19 plus 47.92 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 12,979.20 plus 35.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 75000 s.f. 5,376.67 plus 4.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 75000 s.f. 18,355.87 plus 39.78 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 75000 s.f. 75,000 25,624.07 plus 33.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 150000 s.f. 7,527.56 plus 3.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 150000 s.f. 33,151.63 plus 36.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 150000 s.f. 150,000 50,740.25 plus 31.27 for each additional 100 s.f. or fraction thereof 13,799.94 plus 2.80 for each additional 100 s.f. or fraction thereof 64,540.19 plus 34.07 for each additional 100 s.f. or fraction thereof F-2 Factory Industrial—Low Hazard 2,000 $2,239.32 plus $47.09 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. $4,691.51 plus $22.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. $6,930.83 plus $69.83 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 10000 s.f. 10,000 6,006.69 plus 37.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 6,510.24 plus 20.79 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 12,516.93 plus 58.73 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 20000 s.f. 20,000 10,727.09 plus 28.80 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 8,234.67 plus 18.84 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 18,961.76 plus 47.64 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 40000 s.f. 40,000 16,486.75 plus 27.14 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 12,002.05 plus 16.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 28,488.80 plus 43.46 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 100000 s.f. 100,000 32,769.09 plus 26.16 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 200000 s.f. 14,152.94 plus 13.81 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 200000 s.f. 46,922.03 plus 39.96 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 200000 s.f. 200,000 58,924.54 plus 22.49 for each additional 100 s.f. or fraction thereof 27,960.07 plus 11.87 for each additional 100 s.f. or fraction thereof 86,884.61 plus 34.36 for each additional 100 s.f. or fraction thereof H-1 High Hazard Group H-1 600 $680.40 plus $41.53 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $1,573.68 plus $21.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f. $2,254.09 plus $63.18 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 3000 s.f.

Pose a detonation hazard 3,000 1,677.08 plus 40.43 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 2,093.32 plus 20.57 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 3,770.40 plus 61.00 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 6000 s.f. 6,000 2,889.92 plus 24.54 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 2,612.96 plus 19.49 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 5,502.87 plus 44.03 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 12000 s.f. 12,000 4,362.57 plus 22.37 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 3,782.14 plus 16.95 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 8,144.72 plus 39.32 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 30000 s.f. 30,000 8,389.77 plus 21.65 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 4,539.64 plus 14.41 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 12,929.41 plus 36.06 for each additional 100 s.f. or fraction thereof > half of 100 s.f., to and including 60000 s.f. 60,000 14,885.24 plus 17.61 for each additional 100 s.f. or fraction thereof 8,863.38 plus 11.72 for each additional 100 s.f. or fraction thereof 23,748.62 plus 29.33 for each additional 100 s.f. or fraction thereof

Page 10 of 21 ends