Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
38 26,030
97 6/29/2021
Harbor View Dr
Goldenrod Ave
Marguerite Ave
38 73,910
97 6/29/2021
Harding St
Adams St
Cypress St
20 4,800
92 2/6/2023
Harrow PI
Dover Dr
End
33 7,615
81 12/22/2022
Haven PI
Irvine Ave
St Andrews Rd
35 19,005
74 12/21/2022
Hazel Dr
Poppy Ave (south side)
Coast Highway East
21 29,875
95 6/28/2021
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
29 11,397
95 6/28/2021
Hazel Dr
Coast Highway East
577' N of Coast Highway East
30 17,310
96 6/28/2021
Heather Ln
Irvine Ave
End
34 36,390
89 12/22/2022
Heliotrope Ave
Bayview Dr
Seaview Ave
27 9,450
81 8/6/2021
Heliotrope Ave
Ocean Blvd
Bayview Dr
27 10,800
85 8/6/2021
Heliotrope Ave
Bayside Dr
Coast Highway East
28 28,420
85 8/6/2021
Heliotrope Ave
Seaview Ave
End
27 8,478
88 8/6/2021
Heliotrope Ave
Coast Highway East
Fifth Ave
27 21,195
93 7/1/2021
Heron Way
Keel Dr
Outrigger Dr
32 8,480
97 6/29/2021
Highland Dr
Mariners Dr
Irvine Ave
37 71,965
82 12/22/2022
Highland Dr
Westcliff Dr
Nottingham Rd
38 60,496
87 12/22/2022
Highland Dr
Nottingham Rd
Mariners Dr
38 70,604
87 12/22/2022
Highland St
Ocean Front Alley West
Ocean Front West
19 1,330
85 1/30/2023
Highland St
Seashore Or
Ocean Front Alley West
17 1,224
90 12/20/2022
Highland St
North End
Coast Highway West
30 7,800
93 12/20/2022
Hilaria Way
Flagship Or
South End
36 14,632
63 12/21/2022
Hilaria Way
North End
Flagship Dr
38 8,740
87 12/21/2022
Holiday Rd
Irvine Ave
Tustin Ave
38 49,020
82 12/21/2022
Holiday Rd
Santiago Dr
Tradewinds Ln
38 56,430
83 12/21/2022
Holiday Rd
Galaxy Dr
Santiago Dr
38 6,270
93 12/21/2022
Holly Ln
Tustin Ave
Irvine Ave
34 43,724
84 12/21/2022
Holmwood Dr
Catalina Dr
Broad St
34 46,920
87 12/21/2022
Hospital Rd
Newport Blvd
Old Newport Blvd
70 11,200
93 12/19/2022
Hospital Rd
Superior Ave
Placentia Ave
44 42,944
95 12/19/2022
ISt
Ocean Blvd
Ocean Front East
30 3,540
84 2/6/2023
I St
Balboa Blvd East
Miramar Dr
37 14,060
86 2/6/2023
1 St
Miramar Dr
Ocean Blvd
36 6,120
87 2/6/2023
1 St
North End
Balboa Blvd East
20 4,560
91 2/6/2023
Indian Spring Ln
Irvine Ave
End
52 6,556
91 12/22/2022
Indus St
Kline Dr
West End
33 28,400
91 6/24/2021
Inlet Dr
Marguerite Ave
Keel Dr
36 5,400
89 6/29/2021
Inlet Isle Dr
Topside Ln
Sandcastle Dr
32 37,066
93 6/29/2021
Iris Ave
Bayside Dr
Coast Highway East
27 19,494
70 8/4/2021
Iris Ave
Ocean Blvd
Seaview Ave
28 17,500
93 7/1/2021
Iris Ave
Seaview Ave
North End
28 8,960
93 7/1/2021
Iris Ave
Coast Highway East
Fifth Ave
27 25,515
95 7/9/2021
Irvine Ave
Cliff Dr
Clay St
38 41,534
82 2/13/2023
Irvine Ave
Clay St
15th St
38 23,940
95 12/19/2022
Irvine Ave
15th St
16th St
62 78,554
95 12/22/2022
Irvine Ter
Coast Highway East
Bonnie Doone Ter
64 7,360
26 6/28/2021
Isabella Ter
Seaward Rd
End
24 8,800
73 6/28/2021
6-96
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Island Ave
Edgewater Ave East
Bay Ave East
34 18,258
87 2/6/2023
Island Ave
Balboa Blvd West
Ocean Front West
34 5,270
90 2/6/2023
Island Ave
Bay Ave East
Balboa Blvd West
33 5,412
91 12/16/2022
Island View Dr
Salt Air Dr
Lighthouse Ln
32 26,080
96 6/29/2021
J St
North End
Balboa Blvd East
20 4,800
85 2/6/2023
Jade Ave
Park Ave
Bay Front South
28 11,620
88 8/3/2021
Jade Cove
San Martin Way
End
32 10,300
84 7/2/2021
Jasmine Ave
Ocean Blvd
88' N of Ocean Blvd
28 2,464
54 7/1/2021
Jasmine Ave
Bayside Dr
Coast Highway East
28 13,440
87 8/5/2021
Jasmine Ave
88' N of Ocean Blvd
Seaview Ave
28 12,096
93 7/1/2021
Jasmine Ave
Seaview Ave
North End
27 7,641
93 7/1/2021
Jasmine Ave
Coast Highway East
Third Ave
27 13,716
96 6/28/2021
Jasmine Ave
Third Ave
Fifth Ave
27 20,520
96 6/28/2021
K St
Balboa Blvd East
North End
19 4,085
76 2/6/2023
Kathleen Ln
Beryl Ln
Highland Dr
34 8,840
88 12/22/2022
Kathleen Ln
Teresita Ln
Beryl Ln
34 9,270
95 12/22/2022
Keel Dr
Outrigger Or
End
32 46,108
88 6/29/2021
Keel Dr
Catamaran Dr
Outrigger Dr
32 21,014
91 6/29/2021
Kent Ln
Pembroke Ln
Sussex Ln
34 8,500
81 12/22/2022
Kent Ln
Sussex Ln
Dover Dr
34 14,110
84 12/22/2022
Ketch Rd
Beacon Bay
End
24 7,440
89 7/2/2021
Kewamee Dr
Seadrift Dr
Avocado Ave
37 42,550
38 6/28/2021
Key Bay
Park Green Dr
End
64 5,120
97 6/29/2021
Key View
Sandcastle Dr
End
34 5,410
97 6/29/2021
Key West
Park Green Dr
End
32 8,860
97 6/29/2021
Kings PI
St James Rd
Kings Rd
35 66,080
95 12/22/2022
Kings Rd
Cliff Rd
St Andrews Rd
35 52,850
89 12/22/2022
Kings Rd
St Andrews Rd
Kings PI
35 67,025
95 12/22/2022
Kline Dr
South End
Orchard Or
28 19,000
85 6/29/2021
Kline Dr
Pegasus St
North End
33 21,060
93 6/29/2021
K-Thanga Dr
Dolphin Ter
Bonnie Doone Ter
33 9,075
69 6/28/2021
LSt
Balboa Blvd East
Plaza Del Norte
44 9,504
65 2/7/2023
L St
Plaza Del Norte
Ocean Blvd
36 21,132
82 2/6/2023
LSt
Ocean Blvd
Ocean Front East
30 2,760
91 2/6/2023
La Felicidad
Camelback St
La Salud
44 13,200
90 7/28/2021
La Jolla Dr
Santa Ana Ave
End
16 2,800
84 12/19/2022
La Jolla Dr
End
Cliff Dr
20 4,540
95 12/19/2022
La Jolla Dr
Cliff Or
Beacon St
20 14,300
95 12/19/2022
La Linda Ct
23rd St
End
32 6,368
66 12/21/2022
La Linda PI
23rd St
End
37 22,076
77 12/21/2022
La Salud
La Felicidad
South End
44 20,964
83 7/28/2021
La Salud
North End
La Vida
44 23,956
88 7/28/2021
La Salud
La Vida
Corsica Dr N
44 58,740
90 7/28/2021
La Salud
Corsica Dr N
La Felicidad
44 44,220
90 7/28/2021
La Vida
University Dr
La Salud
44 40,092
83 7/28/2021
Lafayette Ave
31st St
Via Lido
60 23,100
60 12/16/2022
Lafayette Ave
28th St
31st St
24 21,140
93 12/16/2022
6-97
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
V1�IV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Lake Ave
38th St
50' S of 38th St
25 1,250
78 2/6/2023
Lake Ave
50' S of 38th St
36th St
25 8,000
93 12/16/2022
Lake Ave
35th St
34th St
26 5,330
94 12/16/2022
Lake Ave
36th St
35th St
26 5,330
95 12/16/2022
Lake Ave
34th St
33rd St
26 5,330
95 12/16/2022
Lake Ave
33rd St
32nd St
26 5,330
95 12/16/2022
Lake Park Ln
23rd St
Tustin Ave
25 10,750
53 12/22/2022
Lancaster St
30'S of End
End
30 900
91 2/9/2023
Lancaster St
62nd St
61stSt
30 2,370
94 12/21/2022
Lancaster St
Canal St
30' S of End
29 1,740
95 12/21/2022
Larkspur Ave
Bayside Dr
Coast Highway East
28 6,916
81 7/19/2021
Larkspur Ave
Ocean Blvd
Seaview Ave
28 13,160
93 7/1/2021
Larkspur Ave
Seaview Ave
North End
28 10,080
93 7/1/2021
Larkspur Ave
Coast Highway East
Fifth Ave
27 37,962
95 7/9/2021
Laurel PI
Irvine Ave
End
36 18,360
89 12/21/2022
Leeward Ln
Tradewinds Ln
Holiday Rd
33 61,545
76 12/21/2022
Leila Lane
Dover Dr(Cul-de-Sac)
Diana Ln
33 7,920
89 12/22/2022
Lido Park Dr
Lafayette Ave
28th St
54 38,662
61 12/16/2022
Lighthouse Ln
Salt Air Dr
Blue Water Dr
32 35,580
91 6/29/2021
Lincoln Ln
Estelle Ln
Marian Ln
34 53,742
83 12/22/2022
Linda Ln
Irvine Ave
Priscilla Ave
34 7,956
94 12/22/2022
Lindo Ave
Alley N of Bay Ave West
North End
23 1,587
57 2/9/2023
Lindo Ave
Bay Ave West
Alley N of Bay Ave West
23 12,719
93 12/16/2022
Little River Cir
Carmel Bay Or
End
32 5,180
59 7/2/2021
Lugonia St
Prospect St
Newport Shores Dr
29 29,725
75 12/20/2022
Lugonia St
Ocean Front Alley West
Ocean Front West
19 1,349
77 1/30/2023
Lugonia St
Newport Shores Dr
Coast Highway West
19 3,173
87 12/20/2022
Lugonia St
Seashore Dr
Ocean Front Alley West
19 1,121
93 12/20/2022
M St
Ocean Blvd
Ocean Front East
30 2,700
90 2/6/2023
M St
Balboa Blvd East
Seville Ave
30 16,500
92 2/6/2023
M St
Seville Ave
Ocean Blvd
30 13,200
94 2/6/2023
Main St
Balboa Blvd East
Ocean Front East
26 5,460
86 2/6/2023
Main St
Bay Ave East
Balboa Blvd East
20 3,700
93 2/6/2023
Malabar Dr
Seadrift Dr/El Paseo Or
Bonnie Doone Ter
37 25,456
83 6/28/2021
Malibu Cir
Mission Bay Or
End
32 7,560
68 7/2/2021
Mar Vista Dr
Vista Del Oro
Eastbluff Dr
36 81,648
60 8/9/2021
Marapata Dr
Sabrina Ter
Kewamee Dr
37 25,530
73 6/28/2021
Marcus Ave
Rialto
Channel PI
16 11,760
87 12/16/2022
Marcus Ave
36th St
Rialto
26 4,264
88 12/16/2022
Marcus Ave
32nd St
33rd St
26 5,538
93 12/16/2022
Marcus Ave
33rd St
34th St
26 5,954
93 12/16/2022
Marcus Ave
34th St
35th St
26 5,434
93 12/16/2022
Marcus Ave
35th St
36th St
26 5,720
93 12/16/2022
Margaret Dr
Tustin Ave
Irvine Ave
34 43,306
70 12/21/2022
Marguerite Ave
195' S of Coast Highway East
Coast Highway East
38 7,410
63 8/6/2021
Marguerite Ave
Seaview Ave
195' S of Coast Highway East
40 16,200
89 8/6/2021
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
36 26,406
91 6/29/2021
6-98
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
V1�IV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Marguerite Ave
Ocean Blvd
Seaview Ave
40 17,120
93 8/6/2021
Marian Ln
Highland Or
Ruth Ln
38 39,824
80 12/22/2022
Marian Ln
Lincoln Ln
Highland Dr
38 11,202
90 12/22/2022
Marigold Ave
Ocean Blvd
Seaview Ave
27 9,990
52 11/22/2019
Marigold Ave
Fourth Ave
Fifth Ave
27 8,910
62 3/26/2020
Marigold Ave
Seaview Ave
Coast Highway East
28 16,380
84 3/26/2020
Marigold Ave
Coast Highway East
Third Ave
27 22,275
93 7/9/2021
Marigold Ave
Third Ave
Fourth Ave
27 9,315
93 7/19/2021
Marine Ave
Park Ave
Balboa Ave
37 17,390
46 8/2/2021
Marine Ave
Bay Front South
Park Ave
27 12,880
54 8/2/2021
Marine Ave
Balboa Ave
South Bridge End
37 21,867
56 8/2/2021
Marine Ave
South Bridge End
North Bridge End
20 8,000
93 8/2/2021
Marine Ave
North Bridge End
Bayside Dr
20 10,800
93 8/2/2021
Mariners Dr
Dover Dr
Santiago Dr
38 84,056
83 12/21/2022
Mariners Dr
Irvine Ave
Dover Dr
38 55,100
87 12/21/2022
Mariners Dr
Santiago Dr
East End
37 48,084
88 12/21/2022
Marlin Way
Shipway Ln
Terrapin Way
33 25,725
89 12/22/2022
Martingale Way
Corinthian Way
End
44 26,228
1 90
7/30/2021
Mc Fadden PI
Balboa Blvd West
End
22 13,200
84 12/16/2022
Meadow Ln
Tustin Ave
End
35 9,325
78 12/22/2022
Medina Way
Balboa Blvd East
End
19 3,040
84 2/6/2023
Medina Way
Bay Ave East
Balboa Blvd East
20 3,600
87 12/21/2020
Medina Way
Edgewater Ave East
Bay Ave East
20 10,400
89 2/6/2023
Mendoza Ter
Seaward Rd
End
23 17,445
80 6/28/2021
Mesa Dr
Mesa Dr/Birch St
Cypress St
37 42,180
92 7/29/2021
Mesa Dr
Cypress St
End
37 49,765
92 7/29/2021
Mesa View North
Ford Rd
Bonita Canyon Dr
43 17,200
89 7/28/2021
Mesa View South
Bonita Canyon Dr
Ford Rd
43 17,200
87 7/28/2021
Michael PI
15th St
End
34 8,840
86 12/19/2022
Milford Dr
Hampden Rd
Orrington Rd
37 32,375
81 7/1/2021
Milford Dr
Orrington Rd
Camden Dr
37 32,137
91 7/1/2021
Miramar Dr
L St
M St
29 16,965
69 2/6/2023
Miramar Dr
M St
Channel Rd
30 17,700
72 2/6/2023
Miramar Dr
Balboa Blvd East
L St
30 41,610
76 2/6/2023
Mission Bay Dr
Point Loma Dr
Spyglass Hill Rd
36 65,448
59 7/2/2021
Monrovia Ave
15th St West
End
39 20,865
70 12/21/2022
Monrovia Ave
City Limit
15th St West
39 64,545
74 12/21/2022
Montecito Dr
Dana Point Way
Drakes Bay Dr
32 57,518
60 7/2/2021
Montecito Dr
Cambria Dr
Dana Point Way
32 33,664
74 7/2/2021
Monterey Cir
Carmel Bay Dr
End
32 18,696
68 7/2/2021
Montero Ave
Bay Ave East
Edgewater Ave East
33 16,500
99 2/7/2023
Morning Canyon Rd
Coast Highway East
Shorecliff Rd
27 41,964
83 6/28/2021
Morning Canyon Rd
Serra Dr
Seaward Rd
35 32,200
90 6/28/2021
Morning Canyon Rd
Seaward Rd
Coast Highway East
35 12,250
94 6/28/2021
Morning Star Ln
Polaris Dr
End
33 24,775
87 12/22/2022
Morro Bay Dr
Goleta Point Dr (South End)
Goleta Point Dr (North End)
32 42,894
58 7/2/2021
Muir Beach Cir
Goleta Point Dr
End
32 19,740
76 7/2/2021
Narcissus Ave
1175 S of Fifth Ave
I Fifth Ave
30 4,890
34 1 7/9/2021
Narcissus Ave
lCoast Highway East
175' S of Fifth Ave
27 38,610
84 7/9/2021
Narcissus Ave
I Fifth Ave
lGeranium
36 12,384
92 7/9/2021
6-99
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
V1�IV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Narcissus Ave
Ocean Blvd
Seaview Ave
27 9,882
93 7/1/2021
Narcissus Ave
Seaview Ave
Coast Highway East
27 14,931
93 7/1/2021
Nautilus Lane
Toyon Ln
Buttonshell Ln
33 11,760
92 12/22/2022
Neptune Ave
46th St
51st St
24 25,800
88 12/20/2022
Neptune Ave
51st St
End
25 18,750
88 12/20/2022
Newport Coast Dr SB
73 Freeway Bridge
Sage Hill
44 98,340
82 12/21/2020
Newport Hills Dr E
Port Sutton Dr
Newport Hills Dr West
38 75,430
82 7/9/2021
Newport Hills Dr E
Ford Rd
Port Ramsgate PI
36 51,100
83 7/9/2021
Newport Hills Dr E
Port Seaborne Way
Port Sutton Dr
36 65,124
83 7/9/2021
Newport Hills Dr E
Port Ramsgate PI
Port Seabourne Way
37 57,350
87 7/9/2021
Newport Hills Dr W
Port Seabourne Wy
Ford Rd
38 89,148
73 7/9/2021
Newport Hills Dr W
Port Carlow PI
Port Seabourne Wy
38 49,210
1 80
7/9/2021
Newport Hills Dr W
Newport Hills Dr East
Port Carlow PI
36 55,800
83 7/9/2021
Newport Place Dr
MacArthur Blvd
Dove St
62 36,530
76 7/29/2021
Newport Ridge Dr East
San Joaquin Hills Rd
Park Crest
40 59,300
97 6/24/2021
Newport Ridge Dr East
Park Crest
St Michael
40 88,600
97 6/24/2021
Newport Ridge Dr West
St Michael
Whitesands
40 56,800
97 6/24/2021
Newport Ridge Dr West
Whitesands
San Joaquin Hills Rd
40 47,700
97 6/24/2021
Newport Shores Dr
Walnut St
61st St
20 16,540
91 12/20/2022
Newport Shores Or
Orange St
Walnut St
20 12,640
93 12/20/2022
Nordina St
Ocean Front Alley West
Ocean Front West
19 1,235
76 1/30/2023
Nordina St
Seashore Or
Ocean Front Alley West
17 1,445
93 12/20/2022
Norfolk Ln
Dover Dr
Devon Ln
33 7,260
90 12/22/2022
North Star Ln
White Cliffs Dr
End
33 30,550
86 12/22/2022
Nottingham Rd
Dover Dr
Santiago Dr
38 66,804
85 12/22/2022
Ocean Blvd
Carnation Ave
Goldenrod Ave
41 45,920
1 0
7/19/2021
Ocean Blvd
G St
L St
36 54,900
55 2/7/2023
Ocean Blvd
L St
Channel Rd
36 48,060
63 2/7/2023
Ocean Blvd
Iris Ave
Marguerite Ave
48 44,640
89 7/19/2021
Ocean Blvd
Goldenrod Ave
Iris Ave
41 32,062
94 7/19/2021
Ocean Blvd
Marguerite Ave
Poppy Ave
41 64,985
94 7/19/2021
Ocean View Ave
Tustin Ave
Cliff Dr
24 22,128
92 12/21/2022
Old Newport BI
Hospital Rd
City Limit
26 39,375
64 12/21/2022
Old Newport BI
1530' N Hospital Rd
City Limit
15 4,500
69 12/21/2022
Old Newport BI
S95' N of Coast Highway
Hospital Rd
30 28,500
70 2/9/2023
Old Newport BI
Hospital Rd
City Limit
32 58,560
74 2/9/2023
Old Newport BI
270' N of Coast Highway
475' N of Cosast Highway
32 6,560
79 2/9/2023
Old Newport BI
Coast Highway
270' N of Coast Highway
46 12,420
89 12/19/2022
Old Newport BI
475' N of Coast Highway
595' N of Coast Highway
30 3,600
89 12/19/2022
Olive St
Seashore Dr
Ocean Front West
17 2,924
91 12/20/2022
Onyx Ave
Bay Front North
Balboa Ave
27 15,525
67 8/2/2021
Onyx Ave
Balboa Blvd
Park Ave
27 11,340
69 8/2/2021
Onyx Ave
Park Ave
Bay Front South
27 11,070
74 8/2/2021
Opal Ave
Park Ave
Bay Front South
24 13,200
13 6/28/2021
Opal Ave
Collins Ave
Park Ave
23 12,627
18 6/28/2021
Orange Ave
Old Newport Blvd
15th St
36 15,696
1 91
12/19/2022
Orange St
Ocean Front Alley West
Ocean Front West
33 1,716
88 1/30/2023
Orange St
Coast Highway West
Ocean Front Alley West
32 5,312
93 12/20/2022
Orange St
Canal St
Coast Highway West
35 16,380
94 12/20/2022
Orchard Dr
Santa Ana Ave
End
33 47,142
83 6/24/2021
6-100
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Orchard Dr
Bay View Ave
End
35 5,180
89 7/29/2021
Orchard Dr
Irvine Ave
Birch St
40 32,000
91 7/29/2021
Orchard Or
Cypress St
Orchid St
35 16,275
91 7/29/2021
Orchard Dr
Birch St
Cypress St
36 22,680
92 7/29/2021
Orchid Ave
Third Ave
Fifth Ave
28 21,448
59 6/28/2021
Orchid Ave
Coast Highway East
Third Ave
28 23,800
88 6/28/2021
Orchid Ave
Ocean Blvd
Coast Highway East
27 29,862
91 7/1/2021
Orchid Hill PI
Upper Bay Or
End
34 14,450
88 7/29/2021
Orchid St
Orchard Or
Azure Ave
35 17,500
88 7/29/2021
Orchid St
Zenith Ave
Orchard Or
35 33,495
89 7/29/2021
Orrington Rd
Cameo Shores Rd
Milford Or
33 47,025
86 7/1/2021
Outrigger Dr
Keel Dr
Sandcastle Dr
33 47,255
92 6/29/2021
Oxford Ln
Devon Ln
Highland Dr
34 26,440
72 12/22/2022
Pacific Or
Begonia Ave
Acacia Ave
27 8,910
95 8/9/2021
Pacific Or
Acacia Ave
Avocado Ave
27 8,235
95 8/9/2021
Pacific View Or
San Miguel Dr
End
36 97,800
81 12/5/2019
Palm St
Ferry Entrance
Bay Ave East
34 4,080
89 2/13/2023
Palm St
Balboa Blvd East
Ocean Front Alley East
31 2,325
93 12/16/2022
Palm St
Bay AveEast
Balboa Blvd East
34 6,562
95 12/16/2022
Palm St
Ocean Front Alley East
Ocean Front East
31 4,185
95 12/16/2022
Paloma Dr
Holiday Rd
City Limit
35 22,750
82 12/21/2022
Paper Ln
Anniversary Ln
End
33 13,365
57 12/22/2022
Park Ave
Collins Ave
Sapphire Ave
48 25,920
55 8/3/2021
Park Ave
Pearl Ave
Collins Ave
48 35,460
56 8/3/2021
Park Ave
Sapphire Ave
Amethyst Ave
48 26,304
57 8/3/2021
Park Ave
West End
Pearl Ave
48 28,560
60 8/3/2021
Park Ave
Amethyst Ave
West Side of Bridge
46 23,060
68 8/3/2021
Park Ave
East Side of Bridge
Bay Front East
40 22,820
87 8/3/2021
Park Ave
West Side of Bridge
East Side of Bridge
20 5,600
89 11/1/2019
Park Green Or
Sausalito Or
Sandcastle Dr
40 44,400
96 6/29/2021
Park Ln
38th St
36th St
24 10,608
92 12/16/2022
Patolita Or
Dolphin Ter
Bonnie Doone Ter
33 16,170
78 6/28/2021
Patrice Rd
Flagship Rd
South End
37 11,655
68 12/21/2022
Patrice Rd
Bolero Way
Flagship Rd
37 18,500
80 12/21/2022
Peach Tree Ln
Redland Or
End
34 6,868
74 12/22/2022
Pearl Ave
Bay Front North
Park Ave
23 13,386
39 6/28/2021
Pearl Ave
Park Ave
Bay Front South
23 10,695
86 6/28/2021
Pebble Dr
Goldenrod Ave
Sandpiper Or
34 42,398
96 6/29/2021
Pegasus St
Santa Ana Ave
Kline Or
33 38,841
83 7/29/2021
Pelican Hill Rd N
Pelicans Or
Pelican Hill Cir (North Side)
19 50,996
96 6/24/2021
Pelican Hill Rd N
Pelican Hill Cir (North Side)
Pelicans Dr
19 50,996
97 6/24/2021
Pelican Hill Rd N
Newport Coast Dr North
Pelicans Dr
19 23,902
97 6/24/2021
Pelican Hill Rd N
Pelicans Or
Newport Coast Dr
19 23,902
97 6/24/2021
Pelican Hill Rd S
Newport Coast Or
Pelican Hill Cir S
24 142,100
97 6/24/2021
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
24 31,798
97 6/24/2021
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Pelican Hill Cir (North Side)
24 32,448
97 6/24/2021
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Newport Coast Dr
24 142,600
97 6/24/2021
Pembroke Ln
I Mariners Dr
Cornwall Ln
34 32,220
83 12/22/2022
Perham Rd
Cameo Shores Rd
Milford Or
33 45,540
85 7/1/2021
Pescador Dr
Nottingham Rd
Santiago Dr
33 50,271
89 12/22/2022
6-101
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Piazza Genoa
Via Lido Soud
Via Genoa
45 8,640
82 12/16/2022
Piazza Lido
Via Florence
Via Havre
58 29,580
88 12/16/2022
Piazza Lido
Via Havre
Via Koron
24 10,272
92 12/16/2022
Pirate Rd
Cliff Dr
Clay St
35 28,735
95 12/22/2022
Plaza Del Norte
L St
I St
30 11,250
75 2/13/2023
Plaza Del Sur
I St
L St
30 16,050
75 2/13/2023
Poinsettia Ave
Fourth Ave
Fifth Ave
30 9,540
18 6/28/2021
Poinsettia Ave
Coast Highway East
Fourth Ave
28 33,936
59 3/26/2020
Poinsettia Ave
Seaview Ave
Coast Highway East
28 17,864
91 6/28/2021
Poinsettia Ave
Ocean Blvd
Seaview Ave
28 15,316
91 7/1/2021
Point Arena Way
Point Loma Dr
Point Sur Dr
32 22,140
63 7/2/2021
Point Arguello Way
El Capitan Dr
Drakes Bay Dr
36 6,120
1 78
7/2/2021
Point Conception Way
El Capitan Dr
Drakes Bay Dr
36 6,798
92 7/2/2021
Point Loma Dr
Mission Bay Dr
Point Arena Way
32 43,950
48 7/2/2021
Point Mendocino Way
Spyglass Hill Rd
Bodega Bay Dr
36 6,120
63 7/2/2021
Point Sur Dr
Carmel Bay Dr
Point Arena Wy
32 21,390
69 7/2/2021
Polaris Dr
Galaxy Dr
Evening Star Ln
36 44,352
68 12/21/2022
Polaris Dr
Evening Star Ln
Santiago Dr
36 62,148
73 12/21/2022
Poppy Ave
Coast Highway East
Second Ave
30 9,000
24 6/28/2021
Poppy Ave
190'S Coast Highway East
Coast Highway East
21 3,990
87 8/5/2021
Poppy Ave
Ocean Blvd
190' S Coast Highway East
24 27,840
90 8/5/2021
Poppy Ave
Second Ave
Fifth Ave
27 31,050
90 6/28/2021
Pork Barrel Way (35th 1/2 St)
Finley Ave
S End
16 1,280
95 12/16/2022
Port Abbey PI
Newport Hills Drive West
Port Sheffield PI (East End)
32 30,080
75 7/9/2021
Port Abbey PI
Port Sheffield PI (West End)
Newport Hills Drive West
32 24,704
81 7/9/2021
Port Aberdeen PI
Port Whitby PI
Port Durness PI
32 44,628
78 7/1/2021
Port Albans Cir
Newport Hills Dr East
End
54 9,450
85 7/19/2021
Port Albans PI
Newport Hills Dr East
Port Cardigon PI
32 22,240
74 7/19/2021
Port Ashley PI
Port Stirling PI (West End)
Newport Hills Drive West
32 11,200
79 7/9/2021
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
32 19,840
88 7/9/2021
Port Barmouth PI
Port Westbourne PI (West End)
Newport Hills Drive West
32 19,200
75 7/9/2021
Port Barmouth PI
Newport Hills Drive West
Port Westbourne PI (East End)
32 27,200
77 7/9/2021
Port Bishop PI
Newport Hills Dr East
Port Carney PI
33 32,435
78 7/28/2021
Port Bristol Cir
Port Cardiff PI (West Side)
Newport Hills Drive East
32 37,120
71 7/19/2021
Port Bristol Cir
Newport Hills Drive East
End
32 35,040
79 7/19/2021
Port Cardiff PI
Newport Hills Drive East
Port Bristol Cir (East End)
32 16,800
81 7/19/2021
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
32 30,656
85 7/19/2021
Port Cardigan PI
Newport Hills Dr East
Port Albans PI
32 26,880
1 77
7/28/2021
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
32 47,252
83 7/1/2021
Port Carlow Cir
Newport Hills Dr West
End
54 6,210
82 7/28/2021
Port Carlow PI
Newport Hills Dr West
Port Renwick PI
32 30,688
69 7/28/2021
Port Carney PI
Newport Hills Dr East
Port Bishop PI
33 16,998
74 7/28/2021
Port Charles PI
Port Margate PI (West End)
Newport Hills Drive West
32 21,280
69 7/9/2021
Port Charles PI
Newport Hills Drive West
Port Margate PI (East End)
36 36,000
75 7/9/2021
Port Chelsea PI
Newport Hills Drive East
Port Ramsgate PI (East End)
32 17,568
78 7/19/2021
Port Chelsea PI
Port Ramsgate PI (West End)
Newport Hills Drive East
32 31,584
1 81
7/19/2021
Port Claridge PI
Newport Hills Dr East
Port Nelson PI
33 29,445
72 7/28/2021
Port Dunbar Dr
Spyglass Hill Rd
Port Harwick PI
36 6,942
81 7/1/2021
Port Dunleigh Cir
Newport Hills Dr East
lEnd
32 21,696
82 7/19/2021
Port Durness PI
Port Harwick PI
I Port Whitby PI
36 26,238
79 7/1/2021
6-102
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Port Durness PI
Port Whitby PI
Port Aberdeen PI
36 46,364
80 7/1/2021
Port Edward Cir
Newport Hills Or East
End
32 10,400
71 7/28/2021
Port Edward PI
Newport Hills Dr East
Port Locksleigh PI
33 28,860
71 7/28/2021
Port Harwick PI
Port Dunbar Dr
Port Durness PI
36 14,208
83 7/1/2021
Port Hemley Cir
Newport Hills Dr West
End
54 5,940
77 7/28/2021
Port Kimberly PI
Newport Hills Dr West
Port Manleigh PI
32 27,456
77 7/28/2021
Port Laurent PI
Newport Hills Dr East
Port Trinity PI
33 28,535
76 7/28/2021
Port Lerwick PI
Port Whitby PI
Port Carlisle PI
32 31,744
83 7/1/2021
Port Locksleigh PI
Newport Hills Or East
Port Edward PI
33 32,500
74 7/28/2021
Port Manleigh Cir
Newport Hills Or West
Newport Hills Dr West
32 24,000
77 7/28/2021
Port Manleigh PI
Newport Hills Dr West
Port Kimberly PI
32 25,024
72 7/28/2021
Port Margate PI
Port Charles PI (East Side)
Newport Hills Drive West
32 26,880
69 7/9/2021
Port Margate PI
Port Charles PI (West Side)
Newport Hills Drive West
32 12,096
73 7/9/2021
Port Nelson PI
Newport Hills Dr West
Port Charles PI (East Side)
33 30,713
68 7/28/2021
Port Provence PI
Newport Hills Or East
Port Weybridge PI (East Side)
32 27,784
69 7/19/2021
Port Provence PI
Port Weybridge PI (West End)
Newport Hills Dr East
32 37,120
71 7/19/2021
Port Ramsey PI
San Miguel Dr
Port Whitby PI
36 6,008
93 7/1/2021
Port Ramsgate PI
Port Chelsea PI (West End)
Newport Hills Drive East
32 20,256
70 7/19/2021
Port Ramsgate PI
Newport Hills Drive East
Port Chelsea PI (East End)
32 13,760
85 7/19/2021
Port Renwick PI
Newport Hills Or West
Port Carlow PI
32 27,264
73 7/28/2021
Port Seabourne Way
Newport Hills Or West
Newport Hills Dr East
40 63,760
80 7/9/2021
Port Sheffield PI
Newport Hills Drive West
Port Abbey PI (East Side)
32 20,800
70 7/9/2021
Port Sheffield PI
Port Abbey PI (West Side)
Newport Hills Drive West
32 16,224
71 7/9/2021
Port Stanhope Cir
Newport Hills Or West
End
38 5,330
85 7/28/2021
Port Stanhope PI
Newport Hills Or West
Port Tiffin PI
32 23,200
76 7/28/2021
Port Stirling PI
Newport Hills Drive West
Port Ashley PI (East Side)
32 24,960
75 8/6/2021
Port Stirling PI
Port Ashley PI (West Side)
Newport Hills Drive West
32 19,680
84 8/6/2021
Port Sutton Dr
San Miguel Dr
Newport Hills Dr East
49 15,756
70 7/28/2021
Port Taggart PI
Newport Hills Dr West
Port Wheeler PI
32 31,840
73 7/28/2021
Port Tiffin Cir
Newport Hills Or West
End
54 6,210
86 7/28/2021
Port Tiffin PI
Newport Hills Or West
Port Stanhope PI
32 23,360
75 7/28/2021
Port Townsend Cir
Port Bishop PI
End
33 9,735
76 7/28/2021
Port Trinity Cir
Newport Hills Or East
End
33 82
7/28/2021
Port Trinity PI
Newport Hills Or East
Port Laurent PI
33 74
7/28/2021
Port Westbourne PI
Port Barmouth PI (West Side)
Newport Hills Drive West
32 68
7/9/2021
Port Westbourne PI
Newport Hills Drive West
Port Barmouth PI (East Side)
32 M1,760
70 8/6/2021
Port Weybridge PI
Newport Hills Drive East
Port Provence PI (East Side)
33 72
7/19/2021
Port Weybridge PI
Port Provence PI (West End)
Newport Hills Drive East
32 83
7/19/2021
Port Wheeler PI
Newport Hills Or West
Port Taggart PI
32 33,824
70 7/28/2021
Port Whitby PI
Port Ramsey PI
Port Durness PI
36 37,220
91 7/1/2021
Portside Way
Windover Dr
Wavecrest Dr
32 18,432
96 6/28/2021
Powell PI
15th St
End
34 7,480
84 12/21/2022
Prairie Road SB
Bonita Canyon Dr
Ford Rd
35 12,250
90 7/28/2021
Prairie Road NB
Ford Rd
Bonita Canyon Dr
46 16,100
89 7/28/2021
Priscilla Ln
Beryl Ln
Diana Ln
34 23,572
92 12/22/2022
Private Rd
Irvine Ave
Irvine Ave
33 31,110
80 12/21/2022
Production PI
Monrovia Ave
Placentia Ave
1 38
48,070
66 12/21/2022
Prospect St
Ocean Front Alley West
Ocean Front West
18 576
81 1/30/2023
Prospect St
Seashore Dr
Ocean Front Alley West
18 972
88 12/20/2022
Prospect St
Canal St
Cedar St
29 24,824
95 12/20/2022
6-103
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Prospect St
Cedar St
Newport Shores Dr
29 22,765
95 12/20/2022
Prospect St
Newport Shores Dr
Coast Highway West
24 4,320
95 12/20/2022
Prospect St
Coast Highway West
Seashore Dr
46 3,450
95 12/20/2022
Quail St
Campus Dr
Birch St
36 21,060
75 7/29/2021
Quail St
Birch St
Westerly PI
60 37,020
75 7/29/2021
Quail St
Westerly PI
Spruce St
44 40,128
83 7/29/2021
Quail St
Spruce St
Dove St
44 56,144
84 7/29/2021
Quiet Cove
Tiller Way
End
32 16,540
97 6/29/2021
Ramona Dr
Dolphin Ter
Santanella Ter
33 16,863
75 6/28/2021
Ramona Dr
Santanella Ter
Bonnie Doone Ter
33 9,240
77 6/28/2021
Redlands Ave
Clay St
Cliff Dr
34 24,820
91 12/21/2022
Redlands Ave
15th St
Clay St
34 23,120
93 12/21/2022
Redlands Or
South End
23rd St
33 6,699
67 12/21/2022
Redlands Dr
Dawnview Ln
Santa Isabel Ave
33 25,344
69 12/21/2022
Redlands Dr
23rd St
Dawnview Ln
33 18,150
70 12/21/2022
Redlands Dr
Orchard Or
Indus St
33 18,645
90 12/9/2019
Ridge Park Rd
Newport Coast Dr
Tesoro
37 67,081
97 6/24/2021
Ridge Park Rd
Tesoro
Campo Bello
37 47,471
97 6/24/2021
Ridge Park Rd
Campo Bello
Vista Ridge Rd
37 55,167
97 6/24/2021
Ridge Park Rd
Vista Ridge Rd
West Coast Peak
37 50,986
97 6/24/2021
Ridge Park Rd
West Coast Peak
Talmont
37 44,992
97 6/24/2021
Ridge Park Rd
Talmont
East End
37 40,835
97 6/24/2021
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
37 53,613
97 6/24/2021
Rigel Cir
Galaxy Dr
End
56 12,020
58 12/21/2022
River Ave
38th St
40th St
28 12,040
76 2/13/2023
River Ave
40th St
42nd St
28 12,600
78 2/13/2023
River Ave
Balboa Blvd
51st St
38 41,800
88 12/20/2022
River Ave
51st St
End
38 47,500
90 12/20/2022
River Ave
AIIey #325
Balboa Blvd
25 8,250
91 12/16/2022
River Ave
42nd St
Channel PI
28 9,520
95 12/16/2022
Rivera Ter
Seaward Rd
End
23 8,544
77 6/28/2021
Riverside Ave
Cliff Or
15th St
34 47,600
77 12/21/2022
Riverside Ave
Avon St
Cliff Dr
52 49,036
91 12/21/2022
Riverside Ave
Coast Highway West
Avon St (West Side)
52 24,700
93 12/22/2022
Riverside Dr
Orchard Dr
End
33 18,960
86 8/9/2021
Riverside Or
Indus St
End
33 8,430
90 7/29/2021
Rockford PI
Rockford Rd
End
37 11,050
97 7/1/2021
Rockford Rd
Surrey Dr
Cortland Dr
37 24,827
97 7/1/2021
Rocky Point Rd
Goleta Point Dr
End
32 16,380
57 7/2/2021
Roxbury Rd
Cameo Shores Rd
Milford Dr
33 39,501
80 7/1/2021
Ruby Ave
Bay Front North
Balboa Ave
28 12,768
73 8/2/2021
Ruby Ave
Balboa Ave
Park Ave
28 12,180
73 8/2/2021
Ruby Ave
Park Ave
Bay Front South
27 11,286
87 8/2/2021
Ruth Ln
Estelle Ln
Marian Ln
34 22,654
85 12/22/2022
Rutland Rd
Mariners Or
Westcliff Dr
36 48,600
85 12/22/2022
Sabrina Ter
Seadrift Or
Angelita Dr
33 56,826
58 6/28/2021
Salt Air Cir
Salt Air Or
End
32 13,520
97 6/29/2021
Salt Air Or
I Salt Air Cir
I Lighthouse Ln
32 18,420
97 6/29/2021
San Bernardino Ave
I Clay Ave
ICliff Dr
20i
17,200
1 61
2/9/2023
San Bernardino Ave
I Clay Ave
ICliff Or
14 1 12,040
1 90
12/21/2022
6-104
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
San Bernardino Ave
15th St
Clay Ave
34 21,420
92 12/21/2022
San Clemente Dr
Santa Barbara Dr
Santa Cruz Dr
48 54,720
96 7/14/2021
San Joaquin Hills Rd
Backbay Dr
800' E of Backbay Dr
31 29,386
76 6/25/2021
San Joaquin Hills Rd EB
800' E of Backbay Dr
Jamboree Rd
30 32,960
68 8/9/2021
San Joaquin Hills Rd WB
Jamboree Rd
800' E of Backbay Dr
47 44,498
82 8/9/2021
San Martin Way
Bodega Bay Dr
San Mateo Way
36 30,450
67 7/2/2021
San Mateo Way
Bodega Bay Dr
San Martin Way
32 21,980
76 7/2/2021
San Nicolas Dr
Newport Center Dr East
Avocado Ave
78 84,240
97 7/14/2021
Sand Key
Park Green Dr
End
33 17,783
96 6/29/2021
Sand Point Way
Windover Dr
Wavecrest Dr
36 11,580
95 6/29/2021
Sandalwood Ln
Santiago Dr
Candlestick Ln
35 14,670
94 12/22/2022
Sandcastle Dr
Tiller Way
Inlet Isle Dr
36 93,168
88 6/29/2021
Sandcastle Dr
Inlet Isle Dr
Park Green Dr
36 23,544
88 8/6/2021
Sandcastle Dr
Seacrest Dr
Catamaran Dr
36 52,740
93 8/6/2021
Sandcastle Dr
Park Green Dr
Seacrest Dr
36 35,100
95 8/6/2021
Sandcastle Dr
Marguerite Ave
Tiller Way
36 6,948
97 6/29/2021
Sandpiper Dr
Ebbtide Rd
Setting Sun Dr
33 14,855
97 6/29/2021
Sandune Ln
Inlet Isle Dr
End
32 23,240
94 6/29/2021
Santa Ana Ave
Clay St
15th St
20 12,540
52 2/9/2023
Santa Ana Ave
Cliff Dr
Clay St
20 33,100
53 2/9/2023
Santa Ana Ave
Old Newport Blvd
Cliff Dr
24 18,000
89 12/19/2022
Santa Ana Ave
15th St
City Limit
19 12,160
92 12/19/2022
Santa Ana Ave
Clay St
15th St
36 22,572
93 12/19/2022
Santa Ana Ave
Cliff Dr
Clay St
34 56,270
1 94
12/19/2022
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
73 184,325
86 8/9/2021
Santa Isabel Ave
Irvine Ave
Tustin Ave
56 16,240
90 12/22/2022
Santana Dr
Dolphin Ter
Bonnie Doone Ter
33 12,375
81 6/28/2021
Santanella Ter
Patolita Dr
Malabar Dr
33 52,965
73 6/28/2021
Santiago Dr
Pescador Dr
Polaris Dr
37 15,178
46 12/21/2022
Santiago Dr
Irvine Ave
Galaxy Dr
36 31,464
58 12/21/2022
Santiago Dr
Mariners Dr
Nottingham Rd
36 84,960
63 12/21/2022
Santiago Dr
Nottingham Rd
Pescador Dr
36 52,020
68 12/21/2022
Santiago Dr
Galaxy Dr
Antigua Way
36 84,492
69 12/21/2022
Santiago Dr
Antigua Way
Mariners Dr
36 34,308
84 12/21/2022
Santiago Dr
Tustin Ave
Irvine Ave
37 48,375
88 12/21/2022
Sapphire Ave
Balboa Ave
Park Ave
27 11,313
66 8/2/2021
Sapphire Ave
Park Ave
Bay Front South
28 12,180
67 8/2/2021
Sapphire Ave
Bay Front North
Balboa Ave
27 14,580
86 8/2/2021
Sausalito Dr
Marguerite Ave
End
36 23,100
97 6/29/2021
Schooner Rd
Beacon Bay
End
24 6,960
89 7/2/2021
Scott Dr
Corinthian Way
Dove St
44 22,572
90 7/30/2021
Sea Gull Ln
Sherington PI
16th St
37 33,300
90 12/22/2022
Sea Ln
Crown Dr
Harbor View Dr
38 40,964
94 6/29/2021
Sea Ln
Harbor View Dr
Goldenrod Ave
37 49,580
1 94
8/5/2021
Seabreeze Ln
Tiller Way
Surfview Ln
32 36,520
97 6/29/2021
Seacrest Dr
Catamaran Dr
Sandcastle Dr
32 47,200
95 6/29/2021
Seadrift Dr
Malabar Dr
Zahma Dr
37 61,420
39 6/28/2021
Seashore Dr
32nd St
33rd St
33 7,425
66 2/13/2023
Seashore Dr
1 Prospect St
l0range St
28 29,820
75 12/20/2022
Seashore Dr
153rd St
160th St
28 42,000
83 12/20/2022
6-105
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Seashore Or
Orange St
End
27 41,625
85 12/20/2022
Seashore Or
46th St
53rd St
28 42,000
90 12/20/2022
Seashore Or
60th St
Prospect St
28 17,640
91 12/20/2022
Seashore Or
39th St
36th St
28 19,320
92 12/16/2022
Seashore Or
42nd St
39th St
28 18,200
92 12/16/2022
Seashore Or
42nd St
45th St
28 17,640
92 12/16/2022
Seashore Or
46tth St
45th St
28 5,740
93 12/16/2022
Seashore Or
36th St
33rd St
28 19,320
95 12/16/2022
Seaview Ave
Jasmine Ave
Marguerite Ave
30 16,890
42 7/1/2021
Seaview Ave
Carnation Ave
Goldenrod Ave
30 25,710
46 7/1/2021
Seaview Ave
Marguerite Ave
Narcissus Ave
30 18,450
48 7/1/2021
Seaview Ave
Goldenrod Ave
Jasmine Ave
30 27,270
61 7/1/2021
Seaview Ave
Poinsettia Ave
Poppy Ave
28 7,560
83 7/1/2021
Seaview Ave
Narcissus Ave
Orchid Ave
28 7,040
85 7/1/2021
Seaview Ave
Orchid Ave
Poinsettia Ave
28 7,425
85 7/1/2021
Seaward Rd
De Anza Dr
Serra Dr
35 31,990
75 6/28/2021
Seaward Rd
Serra Dr
Coast Highway East
35 12,215
77 6/28/2021
Seaward Rd
Coast Highway East
Evening Canyon Rd
37 9,195
78 6/28/2021
Seaward Rd
Isabella Ter
De Anza Or
35 54,040
81 6/28/2021
Seaward Rd
Evening Canyon Rd
Driftwood Rd
27 7,749
84 6/28/2021
Second Ave
Marguerite Ave
Narcissus Ave
27 15,498
75 3/26/2020
Second Ave
Avocado Ave
Carnation Ave
28 25,144
76 8/5/2021
Second Ave
Carnation Ave
Heliotrope Ave
28 33,600
86 8/5/2021
Second Ave
Orchid Ave
Poinsettia Ave
27 7,236
89 6/28/2021
Second Ave
Poppy Ave
Hazel Ave
27 3,375
94 6/28/2021
Second Ave
Poinsettia Ave
Poppy Ave
27 7,290
95 6/28/2021
Second Ave
Jasmine Ave
Marguerite Ave
27 14,472
96 6/28/2021
Second Ave
Narcissus Ave
Orchid Ave
27 7,263
96 6/28/2021
Serenade Ter
Dolphin Ter
Ramona Dr
33 33,000
79 6/28/2021
Serra Dr
Seaward Rd
De Anza Dr
35 45,675
85 6/28/2021
Serrano Ave
M St
Granada Ave
30 5,550
87 2/13/2023
Setting Sun Dr
Pebble Dr
Sandpiper Dr
33 32,576
97 6/29/2021
Seville Ave
M St
Channel Rd
30 14,550
65 2/13/2023
Seville Ave
Balboa Blvd East
M St
30 20,250
83 2/13/2023
Shell St
Way Ln
End
32 3,770
70 8/5/2021
Sherington PI
Irvine Ave
Sea Gull Ln
37 52,984
91 12/22/2022
Shipway Ln
Tradewinds Ln
Skylark Ln
38 29,716
93 12/22/2022
Shorecliff Rd
Evening Canyon Rd
End
27 26,559
61 6/28/2021
Short St
Newport Blvd
Clubhouse Ave
32 4,320
92 12/16/2022
Short St
Clubhouse Ave
End
16 5,040
95 12/16/2022
Sierra Vista
Tustin Ave
End
32 20,132
80 12/22/2022
Signal Rd
Kings Rd
15th St
35 41,650
94 12/22/2022
Silver Ln
Anniversary Ln
End
33 11,220
51 12/22/2022
Skylark Ln
Commodore Rd
Holiday Rd
38 41,344
86 12/22/2022
Skylark Ln
Highland Or
Commodore Rd
37 9,065
88 12/22/2022
Snug Harbor Rd
Cliff Or
Clay St
35 32,760
95 12/22/2022
Somerset Ln
Highland Or
Highland Dr
34 50,330
87 12/22/2022
Sonora St
Ocean Front Alley West
Ocean Front West
19 1,330
86 1/30/2023
Sonora St
lSeashore Or
10cean Front Alley West
16 1,520
1 91
12/20/2022
Spruce Ave
I Bristol St South
I Azure Ave
35 63,840
1 85
7/29/2021
6-106
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Spruce St
Bristol St North
Quail St
60 36,000
88 7/29/2021
St Andrews Rd
Clay St
15th St
34 20,400
91 12/22/2022
St Andrews Rd
Kings Rd
Clay St
34 35,530
93 12/22/2022
St James PI
15th St
St James Rd
35 24,635
93 12/22/2022
St James Rd
15th St
St lames PI
35 35,275
94 12/22/2022
Starboard Way
Windover Dr
Wavecrest Dr
32 11,424
95 6/29/2021
Starlight Cir
Commodore Rd
Glenwood Ln
35 8,155
93 12/22/2022
Starlight Cir
Glenwood Ln
End
33 8,935
94 12/22/2022
Summit St
Seashore Dr
End
18 3,150
85 12/20/2022
Sundance Dr
19th St
End
29 17,400
84 12/21/2022
Sunset Dr
Lugonia St
End
29 10,527
92 12/20/2022
Surfline Way
Windover Dr
Wavecrest Dr
32 22,556
94 6/29/2021
Surfview Ln
Tiller Wy
Seabreeze Lane
32 24,040
97 6/29/2021
Surrey Dr
Rockford Rd
Cameo Highland Dr
33 36,399
97 7/1/2021
Surrey Dr
Cameo Highland Dr
Garret Dr
33 21,120
97 7/1/2021
Sussex Ln
Dover Dr
Cumberland Ln
34 41,570
85 12/22/2022
Sylvia Ln
Beryl Ln
Deborah Ln
34 16,308
89 12/22/2022
Tahuna Ter
Marapata Dr
Angelita Dr
33 40,755
60 6/28/2021
Teller Ave
Campus Dr
Birch St
44 39,100
59 7/30/2021
Teresita Ln
Kathleen Ln
Vivian Ln
35 19,150
82 12/22/2022
Terrace Ridge
Newport Ridge Dr West
End
38 23,000
85 12/13/2019
Terrapin Way
Shipway Ln
Marlin Way
33 15,450
86 12/22/2022
The Arcade
22nd St
21st St
10 1,670
95 2/13/2023
Third Ave
Marigold Ave
Narcissus Ave
28 7,420
69 7/1/2021
Third Ave
Marguerite Ave
Marigold Ave
28 7,616
74 7/1/2021
Third Ave
Jasmine Ave
Larkspur Ave
27 7,290
78 7/1/2021
Third Ave
Dahlia Ave
Fernleaf Ave
27 7,155
88 7/19/2021
Third Ave
Begonia Ave
Carnation Ave
27 7,155
90 7/19/2021
Third Ave
Heliotrope Ave
Iris Ave
27 7,101
96 7/1/2021
Third Ave
Iris Ave
Jasmine Ave
27 7,290
96 7/1/2021
Third Ave
Larkspur Ave
Marguerite Ave
27 7,452
96 7/1/2021
Third Ave
Narcissus Ave
Orchid Ave
28 7,392
96 7/1/2021
Third Ave
Orchid Ave
Poinsettia Ave
28 7,420
96 7/1/2021
Third Ave
Poinsettia Ave
Poppy Ave
28 7,560
96 7/1/2021
Third Ave
Avocado Ave
Acacia Ave
27 7,290
96 7/19/2021
Third Ave
Acacia Ave
Begonia Ave
27 7,155
96 7/19/2021
Tiburon Bay Dr
Carmel Bay Dr
Point Arena Way
32 31,104
64 7/2/2021
Tiller Way
Sandcastle Dr
Sausalito Dr
36 53,100
1 94
6/29/2021
Topaz Ave
Park Ave
Bay Front South
24 13,920
58 7/30/2021
Topaz Ave
Collins Ave
Park Ave
23 5,474
65 7/30/2021
Topside Ln
Sandcastle Dr
Inlet Isle Dr
32 20,782
96 6/29/2021
Toyon Ln
Holiday Rd
Nautilus Ln
33 15,285
88 12/22/2022
Tradewinds Ln
Santiago Dr
Commodore Rd
38 86,450
90 12/21/2022
Tremont Ln
Cameo Shores Rd
Milford Dr
33 46,860
88 7/1/2021
Turquoise Ave
Bay Front South
Park Ave
28 14,000
59 7/30/2021
Tustin Ave
Santiago Dr
23rd St
34 44,370
1 75
6/29/2021
Tustin Ave
150' South of Windward Ln
Santiago Dr
18 11,900
76 12/21/2022
Tustin Ave
Clay St
115th St
35 22,155
81 12/19/2022
Tustin Ave
Emerson St
I Francisco Dr
37 31,503
81 12/21/2022
Tustin Ave
South End
ISanta Isabel Ave
37 12,700
82 12/21/2022
6-107
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Tustin Ave
Santa Isabel Ave
North End
37 25,400
82 12/21/2022
Tustin Ave
Ocean View Ave
Cliff Dr
26 12,480
89 12/19/2022
Tustin Ave
Cliff Or
Clay St
35 28,245
91 12/19/2022
Tustin Ave
Coast Highway West
Ocean View Ave (S))
34 13,600
95 12/22/2022
Twin Lakes Cir
Carmel Bay Or
End
32 6,684
67 7/2/2021
University Or
Irvine Ave
South End
40 50,400
80 12/22/2022
Upper Bay Or
Mesa Or
Orchid Hill PI
36 18,972
88 7/29/2021
Via Antibes
Via Lido Soud
Via Lido Nord
36 8,928
95 12/16/2022
Via Antibes
Via Lido Nord
Via Lido Soud
36 8,928
95 12/16/2022
Via Barcelona
Via Lido Soud
Via Lido Nord
20 6,540
90 12/16/2022
Via Cordova
Via Lido Soud
Via Lido Nord
20 9,000
87 12/16/2022
Via Dijon
Via Lido Soud
Via Lido Nord
20 11,400
89 12/16/2022
Via Eboli
Via Lido Soud
Via Lido Nord
20 14,040
86 12/16/2022
Via Fermo
Via Lido Soud
Via Firenze
16 4,096
93 12/16/2022
Via Firenze
Via Lido Nord
Piazza Lido
16 7,152
91 12/16/2022
Via Firenze
Piazza Lido
Via Lido Soud
16 5,696
93 12/16/2022
Via Florence
Via Lido Soud
Piazza Lido
24 6,480
95 12/16/2022
Via Genoa
Via Lido Soud
Piazza Lido
43 18,920
80 12/16/2022
Via Genoa
Piazza Lido
Via Lido Nord
43 19,178
82 12/16/2022
Via Graziana
Via Havre
Piazza Lido
18 8,820
92 12/16/2022
Via Graziana
Piazza Lido
Via Lido Nord
16 7,520
92 12/16/2022
Via Havre
Via Lido Soud
Piazza Lido
23 10,925
85 12/16/2022
Via Ithaca
Via Lido Soud
Via Lido Nord
20 19,400
87 12/16/2022
Via Jucar
Via Lido Soud
Via Lido Nord
23 21,275
92 12/16/2022
Via Koron
Via Lido Soud
Via Lido Nord
23 20,930
93 12/16/2022
Via Lido
Bridge (West End)
Via Lido Soud
22 28,420
95 12/15/2022
Via Lido Nord
Via Zurich
Via Waziers
33 17,820
93 12/15/2022
Via Lido Nord
Via Waziers
Via San Remo
33 21,813
93 12/15/2022
Via Lido Nord
Via San Remo
Via Palermo
33 17,853
93 12/15/2022
Via Lido Nord
Via Palermo
Via Lorca
33 21,318
93 12/15/2022
Via Lido Nord
Via Lorca
Via Genoa
33 25,377
93 12/15/2022
Via Lido Nord
Via Genoa
Via Dijon
33 18,843
93 12/15/2022
Via Lido Nord
Via Dijon
Via Antibes
33 17,490
93 12/15/2022
Via Lido Nord
Via Antibes
Via Lido Soud (West Side)
20 9,200
93 12/15/2022
Via Lido Nord
Via Lido Soud (East Side)
Via Zurich
33 18,647
94 12/15/2022
Via Lido Soud
Via San Remo
Via Venezia
33 17,160
91 12/15/2022
Via Lido Soud
Via Zurich
Via Lido Nord (East Side)
53 24,965
91 12/15/2022
Via Lido Soud
Via Lido Nord (West Side)
Via Antibes
20 6,800
92 12/15/2022
Via Lido Soud
Via Orvieto
Via San Remo
33 22,110
92 12/15/2022
Via Lido Soud
Via Antibes
Via Dijon
33 20,625
93 12/15/2022
Via Lido Soud
Via Dijon
Via Genoa
33 27,060
93 12/15/2022
Via Lido Soud
Via Genoa
Via Koron
33 28,050
93 12/15/2022
Via Lido Soud
Via Koron
Via Orvieto
33 21,780
93 12/15/2022
Via Lido Soud
Via Venezia
Via Zurich
33 21,780
94 12/15/2022
Via Lorca
Via Lido Soud
Via Lido Nord
20 17,500
93 12/16/2022
Via Malaga
Via Oporto
Via Lido
22 6,490
93 12/16/2022
Via Marina
Tustin Ave
End
33 18,538
91 12/22/2022
Via Mentone
Vai Lido Soud
Via Lido Nord
20 17,000
93 12/16/2022
Via Nice
Via Lido Soud
IVia Lido Nord
20 16,200
1 92
12/16/2022
Via Oporto
IVia Lido
ICentral Ave
29 17,400
1 86
2/17/2023
6-108
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Via Oporto
32nd St
Via Lido
23 13,225
93 12/16/2022
Via Orvieto
Via Lido Soud
Via Lido Nord
23 18,055
95 12/16/2022
Via Palermo
Via Lido Soud
Via Lido Nord
22 16,764
92 12/16/2022
Via Quito
Val Lido Soud
Via Lido Nord
20 14,200
92 12/16/2022
Via Ravenna
Via Lido Soud
Via Lido Nord
20 13,200
89 12/16/2022
Via San Remo
Via Lido Soud
Via Lido Nord
23 15,240
95 12/16/2022
Via Trieste
Via Lido Soud
Via Lido Nord
20 12,000
93 12/16/2022
Via Undine
Via Lido Soud
Via Lido Nord
20 11,400
93 12/16/2022
Via Venezia
Via Lido Soud
Via Lido Nord
20 10,700
93 12/16/2022
Via Waziers
Via Lido Soud
Via Lido Nord
23 11,845
95 12/16/2022
Via Xanthe
Via Lido Soud
Via Lido Nord
20 9,800
93 12/16/2022
Via Yella
Via Lido Soud
Via Lido Nord
20 9,300
91 12/16/2022
Via Zurich
Via Lido Soud
Via Lido Nord
21 9,030
91 12/16/2022
Villa Way
29th St
32nd St
22 17,160
87 12/16/2022
Villa Way
28th St
29th St
25 8,000
95 12/16/2022
Vista Baya
West End
Tustin Ave
33 19,891
77 12/22/2022
Vista Baya
Tustin Ave
East End
24 13,305
77 12/22/2022
Vista Del Oro
Eastbluff Dr (South End)
Vista Caudal
36 103,068
47 6/25/2021
Vista Del Oro
Vista Entrada
Vista Del Sol
35 76,475
63 6/25/2021
Vista Del Oro
Vista Caudal
Vista Entrada
35 36,400
64 6/25/2021
Vista Del Oro
Vista Del Sol
Vista Nobleza
35 74,900
74 6/25/2021
Vista Del Oro
Vista Umbrosa
Eastbluff Dr (North End)
35 26,425
82 6/25/2021
Vista Del Oro
Vista Nobleza
Vista Umbrosa
35 65,800
88 6/25/2021
Vista Del Sol
Vista Del Oro
Eastbluff Dr
60 28,200
84 6/25/2021
Vista Ridge Rd
Ocean Heights Or
Ridge Park Rd
37 22,903
93 8/6/2021
Vista Ridge Rd
Newport Coast Or
Altezza Dr
37 55,241
96 6/24/2021
Vista Ridge Rd
Ocean Heights Or
Coastal Canyon Dr
37 76,479
96 6/24/2021
Vista Ridge Rd
Altezza Or
Ocean Heights Dr
37 68,709
97 6/24/2021
Vista Ridge Rd
Coastal Canyon Dr
Ocean Heights Dr
37 62,715
97 6/24/2021
Vivian Ln
Beryl Ln
Diana Ln
34 28,196
86 12/22/2022
Walnut St
Prospect St
Newport Shores Dr
29 25,694
69 12/20/2022
Walnut St
Ocean Front Alley West
Ocean Front West
19 1,330
77 1/30/2023
Walnut St
Seashore Or
Ocean Front Alley West
18 990
88 12/20/2022
Walnut St
Newport Shores Or
Coast Highway West
19 3,135
89 12/20/2022
Warwick Ln
Marian Ln
Nottingham Rd
33 8,052
82 12/22/2022
Warwick Ln
Estelle Ln
Marian Ln
33 24,486
83 12/22/2022
Washington St
Edgewater PI
Bay Ave East
18 1,800
87 2/13/2023
Washington St
Balboa Blvd East
Ocean Front Alley East
14 1,190
93 12/16/2022
Washington St
Bay Ave East
Balboa Blvd East
20 2,800
94 12/16/2022
Washington St
Ocean Front East
Ocean Front Alley East
14 1,890
95 12/16/2022
Waterfront Dr
Avocado Ave
Acacia Ave
30 8,430
91 8/9/2021
Wavecrest Dr
Surfline Wy
Sand Point Wy
36 41,660
94 6/29/2021
Way Ln
Fernleaf Ave
Shell St
15 6,285
74 8/5/2021
Way Ln
Dahlia Ave
Fernleaf Ave
15 4,710
75 8/5/2021
Wayne Rd
Rockford Rd
Cameo Highlands Dr
33 22,935
97 7/1/2021
West Wind Way
Polaris Dr
End
34 29,448
94 12/22/2022
Westcliff Dr
Dover Or
Santiago Dr
32 48,992
83 12/22/2022
Westerly PI
IDoveSt
lQuail St
44 61,864
87 7/29/2021
Westminster Ave
Old Newport Blvd
15th St
36 61,920
95 12/21/2022
White Cliffs Dr
Polaris Dr
I North Star Ln
38 8,400
86 12/22/2022
6-109
Appendix B - Local Streets
Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV
PAVEMENT
ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
White Sails Way
Crown Dr
Harbor View Dr
33 34,485
95 6/29/2021
Windover Dr
Surfline Way
Sand Point Way
36 38,328
95 6/29/2021
Windward Ln
Tustin Ave
Irvine Ave
33 42,570
82 12/21/2022
Windward Ln
Tradewinds Ln
Leeward Ln
33 48,060
90 12/21/2022
Yawl Rd
Beacon Bay
End
24 6,000
89 7/2/2021
Zahma Dr
Kewamee Dr
Chubasco Dr
37 19,610
68 6/28/2021
Zenith Ave
Spruce Ave
Orchid St
35 9,940
74 7/29/2021
Zenith Ave
Bayview Ave
Spruce Ave
35 9,905
88 7/29/2021
Zurich Cir
Via Zurich
Via Zurich
16 7,200
93 12/16/2022
6-110
Appendix B - Local Streets
MPavement Management Plan Agency Submittal
OCTA
XIII. Appendix C — GIS Digital Data
Introduction
The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road information is pavement condition.
Maintaining an inventory of pavement condition will enhance OCTA's GIS visualization and analysis capabilities and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report.
Structure of GIS Data
The GIS dataset must consist of linear geographic features that represent road/street segments. All segments that are part of the report should be included in the GIS dataset. The attribute information of each segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above.
The GIS data requirements are discussed below. Most commercial and open -source GIS software provides industry -standard tools to manage GIS data to meet these requirements.
GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
• Esri Shapefile, or
• Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
• Title of Dataset
• Tags (A set of words that can be used by GIS to search for the resource. For example: "pavement", "transportation", "roads")
• Summary (A brief purpose statement of the dataset)
• Description (A brief narrative of the dataset's content) • Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type
The spatial geometry of the segment features must be lines that represent the roadway centerline as accurately as possible.
Projection
The GIS data must have spatial reference information and have its coordinate system identified and embedded in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected coordinate system:
6-111
M
OCTA
Pavement Management Plan Agency Submittal
• NAD 1983 State Plane California VI FIPS O406 (US Feet) - More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/ GIS Feature Attributes
The required segment attributes are:
• Street name
• Unique segment identifier (Segment ID from original source if available) • Name of intersecting road at the beginning of a segment • Name of intersecting road at the end of the segment
• Current pavement condition index (PCI)
• Current PCI inspection date
• Length of road segment in feet
• Width of road segment in feet
• Paved area of road segment in square feet or square yards • Projected PCI at end of Seven -Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided. An example of a GIS attribute table for road segments is shown below (Note that there are additional attributes such as surface, functional class, and number of travel lanes).
OBJECTID Sec ID Street Name
Fru
1 I 41
4022 ARBOROCOD
HE
2 44
4025 ARBORWOOD
B
45 4031 ARBORWOOD
WI
4 J 46
4137 ARBORWOOD
VAL
5 47
4195 ARBORWOOD
CI
TR
N
m Te PCI Imp Date Length Width Area Surtace FuncCka � Lanes NGE LN CANYONWOOD 89 1/11/2013 254 40 12192 AC SECONDARY 2 YALE CT 92 1/11/2013 374 48 17952 AC SECONDARY 2
NTH ROP BETHESDA 89 1/11/2013 866 48 41568 AC SECONDARY 2 ECT HEDGELN 89 1/11/2013 1691 48 81168 AC SECONDARY 2
USGLEN WINTHROP 90 1/11/2013 434 48 20932 AC SECONDARY 2 AVE UNIVERSITY DR 99 12119/2012 WB 58 2NI34 AC SECONDARY 4 CARTHUR BLVD VON (CARMAN AVE 93 12/19/2012 16D 30 64570 AC SECONDARY 4 KARMAN AVE TELLER AVE 93 12/1912012 1310 30 39300 AC SECONDARY 4 LER AVE JAMBOREE RD 95 12/19/2012 700 24 ISM AC SECONDARY 4 MBOREE RD CARLSON AVE 98 12/19/2012 1164 68 88752 AC SECONDARY 2 EADOWOOD ARBORINOOD 89 1/11/2013 1026 47 48477 AC SECONDARY 2 HELSON DR PALATINE 100 12/19/2012 1146 65 74490 7AC SECONDARY 4
6-112
6-112
M
OCTA
Pavement Management Plan Agency Submittal
XIV. Appendix D — Quality Assurance/Quality Control Plan Introduction
When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management system.
The Quality Assurance/Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for updates of the pavement management system.
Objectives
This document constitutes a formal QA/QC Plan for the City of Newport Beach. It was prepared in February, 2023.
Specifically, it is intended for the 2023 Pavement Management Plan Update. The focus is on the collection of network -level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP) Synthesis 401 Quality Management of Pavement Data Collection, as "Network -level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices.")
This document also addresses the QA/QC plan requirements of the Orange County Transportation Authority (OCTA)'s "Countywide Pavement Management Plan Guidelines" (section 2.4), adopted in May 2010.
Structure of QA/QC Plan
The following components are addressed in this QA/QC Plan:
• Condition survey procedures used
• Accuracy required for data collection
• Inspector qualifications and experience
• Safety
6-113
M
OCTA
Condition Survey Procedures
Pavement Management Plan Agency Submittal
The governing document in performing condition surveys for the City of Newport Beach is ASTM D6433 "Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys." Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type.
Asphalt Concrete AC Pavements
1. Alligator (fatigue) cracking
2. Bleeding
3. Block cracking
4. Bumps and sags
5. Corrugation
6. Depression
7. Edge cracking
8. Joint reflection cracking
9. Lane/Shoulder drop off
10. Longitudinal & Transverse cracking
11. Patching and utility cut patching
12. Polished aggregate
13. Potholes
14. Railroad crossing
15. Rutting
16. Shoving
17. Slippage cracking
18. Swell
19. Weathering
20. Raveling
Portland Cement Concrete (Jointed)
1. Blowup/buckling
2. Corner breaks
3. Divided slab
4. Durability ("D") cracking
5. Faulting
6. Joint seal damage
7. Lane/shoulder drop off
8. Linear cracking
9. Patching (large) and utility cuts
10. Patching (small)
11. Polished aggregate
12. Popouts
13. Pumping
14. Punchout
15. Railroad crossing
16. Scaling, map cracking and crazing
17. Shrinkage cracks
18. Spalling (corner)
19. Spalling (joint)
6-114
M
OCTA
Pavement Management Plan Agency Submittal
Any exceptions to the above procedures were discussed before any surveys were performed. These exceptions are usually related to distresses or situations that are not covered in the manuals. Examples include roller check marks or edge cracking on streets with no curbs and gutters. Others include the raveling of surface seals or the use of open -graded asphalt concrete mixes where the surface appears to have large voids present.
All surveys were performed as walking surveys on MPAH, and a combination of walking and windshield on local streets. A minimum 10% sampling rate was utilized. Field crews were typically composed of one -person crew and sometimes more when a street with high traffic volume was surveyed.
The safety of field personnel is paramount in all instances.
The sample unit selected must be representative of the entire pavement section. This assumes that the section is homogenous; if it is not homogeneous, then the section must be split according to the criteria agreed upon by the agency. Typically, the criteria used are:
• Pavement condition
• Construction age, if known
• Maintenance history, if known
• Traffic volumes (or functional classification as a surrogate) • Surface types (e.g. asphalt concrete or Portland cement concrete) • Geometric elements (e.g. widths)
Any modifications to the section inventory data are documented in the pavement management report.
A sample unit must be between 2,500 ± 1,000 square feet in conformance with ASTM D6433 protocols. Typical sample unit dimensions are 100 feet long by the width of the street. Streets that are wider than 40 feet wide will have shorter lengths (generally 50 feet) or if they are divided by a raised median, separate sample units will be taken in each direction.
Any pavement areas that are not representative of the section will be noted and surveyed as an additional sample unit.
Accuracy Required for Data Collection
The accuracy required for data collection has two components, both of which are further described in the following paragraphs.
• Re -inspections
• PCI comparisons with past surveys
Random and Systematic Re -Inspections
Random Re -inspections
Random re -inspections will include a representative selection across the following categories:
• Functional classes (i.e. MPAH, locals);
• Surface types (e.g. asphalt concrete or Portland cement concrete); • Pavement conditions (e.g. good, fair, poor);
• Inspectors;
• Geographical areas, if applicable.
18 6-115
MPavement Management Plan Agency Submittal
OCTA
Systematic Re -inspections
For systematic re -inspections, this could be due to noticed trends such as specific treatment types (e.g. open - graded mixes), a specific inspector or geographical area. In such cases, more than 5% will be re -inspected.
Acceptability Criteria
At the time of re -inspection, the actual distresses will be re -inspected and verified, and any corrections made, if necessary. Distress types and severities must be the same and re -measured quantities within ±10% of the original measured quantity.
If corrections are required on more than 10% of the re -inspected sample unit, then an additional 5% will be re- inspected. This will continue until more than 95% of the re -inspected sections meet the acceptability criteria.
PCI Comparison with Past Surveys
As another level of quality control, the new PCIs are compared with the previous PCIs. If they differ by more than ±10 PCI points, these sections are automatically flagged for further investigation.
If PCI Increases 10 points
The section is investigated to see if a maintenance and rehabilitation event has occurred since the last survey, but has not been recorded. Typically, it may include activities such as:
• Crack sealing activities— changes medium or high severity cracking to low severity • Patching activities — alligator cracking that has been removed and patched, so that the resultant PCI is increased.
• Surface seals
• Overlay
• Others
Therefore, an up-to-date maintenance and rehabilitation history file in the pavement management database is desirable, both for historical accuracy as well as to provide additional quality control.
If PCI decreases 10 points
The section is checked to see if the average deterioration rate (usually 3 to 4 points per year) is exceeded. If the drop in PCI is within range of what is acceptable, no further action is required. If the drop is more than the acceptable range, a re -inspection will be performed. The default performance curves in the pavement management software form the basis for what is acceptable.
6-116
MPavement Management Plan Agency Submittal
OCTA
Inspector's Qualifications and Experience
GMU inspectors have attended formal training on pavement condition distress surveys, and all of them are certified by OCTA. This training was conducted prior to performing any work using the ASTM D6433 protocols, consistent with OCTA's requirements.
Inspector Name
Date of ASTM D6433 Training
Training Conducted By:
Jeffrey Matsushita
February 2022
GMU and University of
California, Davis
Jasdeep Bains
July 2022
GMU and California State
University, Chico
Ali Zalghout
December 2019
OCTA and Colorado State
University (Mo Shahin)
Resumes of the technicians utilized on this project are included as an attachment.
Safety Procedures
GMU administers a health and safety program in compliance with the Cal Occupational Safety and Health Administration (OSHA) Title VIII, Section 3203. The program is documented in GMU'S Workplace Safety Manual.
Generally, the safety procedures include:
• Inspectors to wear Class 2 or 3 safety vest at all times; • Stopped vehicles to be parked at locations away from moving traffic (e.g. nearby parking, shoulders, etc.);
• Inspectors to survey the street from the curb or shoulder, especially when Arterials are being surveyed.
On streets where there is a high volume of traffic or high speeds, additional measures may be necessary, such as:
• Surveys to occur during off-peak periods or on weekends; • Additional inspector to watch out for traffic; and
• Traffic flaggers in extreme cases.
All GMU employees are required to acknowledge that they have read the GMU Safety Manual carefully. This manual is updated annually, and all employees receive an updated copy.
Attachment —Appendix D: Resumes of Field Inspectors
---End of QA/QC Plan ---
6-117
JASDEEP SINGH BAINS
Staff Pavement Engineer
V 1"Wr1 V
PAVEMENT
ENGINEERING
Jasdeep possesses over three years of experience in pavement
PROFESSION
engineering consisting of pavement evaluation, construction Civil Engineer
inspection, and laboratory testing. His current work consists of performing pavement evaluations for several
EDUCATION
municipalities and private sector clients, providing
B.S. Civil Engineering
construction management and materials testing services to California State University, Chico
assure compliance with project construction specifications.
He has provided materials testing services for local agencies
PROFESSIONAL EXPERIENCE
such as the cities Irvine, Garden Grove, Stanton, and Laguna GMU Geotechnical, Inc.
Niguel as well as construction management for private clients (June 2022 —Present)
Staff Pavement Engineer
including Canyon Lake Property Owners' Association, Casta Rancho Santa Margarita, California
Del Sol Homeowners' Association (HOA), and Harbor Ridge HOA.
California Pavement Preservation
Center
Jasdeep's experience in pavement evaluation and
(May 2019 — Jan 2021)
construction includes:
Research Assistant
Chico, CA
• Pavement Management Plans (PMP) for local
HONORS AWARDS
Cities and HOAs
• Honor of Distinguished
• Budget analysis and Maintenance and
Capstone Project from ASCE
Rehabilitation (M&R) planning using PAVER
Region 9
• Field Data Collection using Manual surveys
CERTIFICATIONS
• Pavement Condition Index (PCI) calculations
• OCTA Certified Pavement
and analysis
Inspector
• Nuclear Gauge Certification
• Falling Weight Deflectometer (FWD) testing
and analysis
• Slurry Seal observation and testing
• Materials testing and observation of
construction practices
SELECT PROJECT EXPERIENCE
Pavement Management Plan Update, City of
Newport Beach, CA. (Ongoing) Performing
pavement distress surveys, collecting distress data,
and performing PAVER analysis.
Pavement Management Plan Update, Rancho
Mission Viejo, CA (September 2022) Performed
pavement distress surveys, collected distress data,
and performed PAVER analysis.
6-118
Pavement Management Plan Update, Dove Canyon HOA in Rancho Santa Margarita, CA Update (January 2023). Performed pavement distress surveys, collected distress data, and performed PAVER analysis.
Pavement Management Plan Update, Garden Grove, CA Performed pavement distress surveys, collected distress data, and performed PAVER analysis.
City of Garden Grove Various Streets Rehab 2022 (October 2022) Performed materials testing and observation for construction of various streets and helped city inspector point out possible areas of interest.
City of Stanton Citywide Street Resurfacing (August 2022) Performed materials testing and observation for construction of various streets and helped city inspector collect tickets and track quantities.
ICOP Irvine Co. Office Properties (February 2023) Located localized repair areas and mapped out utilities and areas requiring edge -milling. 6-119
CERTIFICATE
Of Prequalification
This certificate has been
presented to
jLqsdee P BaIns0
for successfully meeting the requirements of the
OCTA 2022-2023 Pavement Inspector Pre qualification
Program
using MANUAL survey techniques
EXPIRATION:
6.30.2025
www.WestCoastEC.com/OCTA
JEFFREY MATSUSHITA
Staff Pavement Engineer
PROFESSION
Civil Engineer
EDUCATION
B.S. Civil Engineering, University of
California, Davis
AFFILIATIONS
Civil Engineering Honors Society
(Chi Epsilon)
CERTIFICATIONS
- Engineer in Training (EIT)
- OCTA Pavement Inspector
A00M " I I
%31"VIIJ
Jeffrey possesses three years of experience in pavement engineering consisting of pavement evaluation, construction management, construction inspection, and laboratory
testing. His current work consists of performing pavement evaluations for several municipalities and private sector clients, providing construction management and testing
services to assure compliance with project construction specifications, and preparing documents for contract
administration. He has provided construction management and testing services for local agencies such the cities Lake Forest, Rancho Santa Margarita, and Laguna Niguel as well as private clients including Canyon Lake Property Owners' Association, Ocean Ranch Homeowners' Association
(HOA), and Harbor Ridge HOA.
SELECT PROJECT EXPERIENCE
Pavement Management Plan Update, City of Laguna
Niguel, CA: Performed pavement distress survey
Pavement Management Plan Update, City of Newport
Beach, CA: Performed pavement distress survey
Pavement Management Plan, Newport Mesa Unified
School District, Newport Beach, CA: Performed
pavement distress survey, created inventory of PCC
sections for repair
Parkway Drive and Denholm Drive Project, City of El
Monte, El Monte, CA: Performed pavement coring to
identify thicknesses of pavement cross section and provided USCS soil classifications
Pavement Evaluation, Dove Canyon, Rancho Santa
Margarita, CA: Mark sections for coring, performed
pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications, created report appendices
El Toro Raised Medians, City of Lake Forest, Lake
Forest, CA: Marked sections for coring locations, created report appendices, identified areas for localized repair, drafted localized repair areas in AutoCAD,
23241 Arroyo Vista, Rancho Santa Margarita, CA 92688 1 ph: 949.888.6513 1 fax: 949.888.1380 1 web: www.gmugeo.com 6-121
Residential Road Resurfacing Phase 1 and 2, City of South Gate, CA: Performed pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications, created report appendices, drafted coring location map in AutoCAD
On -Call Pavement Design Services, City of San Fernando, CA: Performed pavement coring to identify thicknesses of pavement cross section and provided USCS soil classifications, created report appendices, drafted map according to PCI in AutoCAD
Annual Roadway Resurfacing Project, City of Dana Point, CA: Drafted field density test maps in AutoCAD
Mission Bay Drive Pavement Rehabilitation, City of Newport Beach, CA: Drafted field density test maps in AutoCAD
Newport Blvd and Balboa Blvd Pavement Evaluation, City of Newport Beach, CA:
Marked sections for coring, performed paving coring to identify thicknesses of pavement cross section and provided UCCS soil classifications, created report appendices, drafted field density test maps in AutoCAD Via Lido Soud and Nord Pavement, City of Newport Beach, CA: Drafted field density test maps in AutoCAD
Turtle Rock Park Parking Lot Rehab, City of Irvine, CA: Drafted field density test maps in AutoCAD Jeffrey Matsushita
6-122
CERTIFICATE
Of Prequalification
This certificate has been
presented to
0 eff Matsushlta
for successfully meeting the requirements of the
OCTA 2021-2022 Pavement Inspector Prequalification Program using MANUAL survey techniques
EXPIRATION:
6.30.2024
www.WestCoastEC.com/OCTA
M
OCTA
Pavement Management Plan Agency Submittal
XV. Appendix E — Pavement Management Data Files
The Pavement Management data files shall be submitted to OCTA in spreadsheet format. This must include the following information:
• Street name and limits for all public streets
• Street identifiers (Branch ID, Section ID)
• Direction (if applicable)
• Beginning and ending of each section
• Length, widths, and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• PCI and date of inspection
• Type of recommended treatment
• Cost of recommended treatment
• Street geometry as linear features
The Pavement Management data files are attached here on a CD/flash drive, or included as Appendix E XVI. Appendix F — GIS Maps — Current Conditions (Optional) If included, attach and label Appendix F.
6-124
— — ADAMS A
- — ! coast toll
Santiago De
Santa Ana Costa Mesa
I Li ndnl
L
a —
� �T
a
Q C -- --
r,
i C
_ C i
_ Sar
Ir N
i
a
v
CALIFORNIA
0 0
I
ro
n
I
N
N
O
C�
z 0
3000'
3 a
Mtn rll,rinl lianr
PCI RANGE
LEGEND
f`ark Pl. r.-I��.�c
PCI RANGE 85
- 100
GOOD
PCI RANGE 75
85 h:ine N Cmhus
,P
!!/
T
—
FAIR
PCI RANGE 60
74 PCI RANGE 41
- 59
peek
cc
unl
fveac
I I.11l
PCI RANGE 0-40
Unrr Of Califcrn"
Ofil Ilia.
Ir.w_ In
I II
l Irvine lvledlcal Sch
It m
DI'I I_n it
n
-rnn
11 .I fll
l
GIN
;y,ICa h'esec+i��d�'Qlti�
rystal Cove
4T�
IC!'_C The N l.ti—1 R/1— Nlatinnal Rnnnrlariac n;;tacat RnFP Flevatinn Pronram C;POnr 6-125