Cities Index.
06 - Annual Measure M2 Eligibility Submittal

Newport Beach City Council
June 13, 2023

Document
06 - Annual Measure M2 Eligibility Submittal
Meeting
June 13, 2023
Body
Newport Beach City Council
Pages
121
Text extracted from the city's file for reading and search. Open the original on ecms.newportbeachca.gov. That file is the official record.

Q �EwPpRT

CITY OF
s NEWPORT BEACH
`q44:09 City Council Staff Report
June 13, 2023
Agenda Item No. 6
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311, [email protected]
PREPARED BY: Theresa Schweitzer, Finance and Administrative Manager [email protected]
PHONE: 949-644-3335
TITLE: Resolution No. 2023-35: Annual Measure M2 Eligibility Submittal

ABSTRACT -
The City of Newport Beach (City) must annually submit certain required documents in order to maintain eligibility to receive Measure M2 Fair Share and Competitive funding from the Orange County Transportation Authority (OCTA). The submittal documentation this year requires approval of an updated Measure M2 Seven -Year Capital Improvement Program (CIP) and a City Council resolution regarding the status and update of the Circulation Element/Master Plan of Arterial Highways (MPAH) Consistency, Mitigation Fee Program (MFP), a Local Signal Synchronization Plan (LSSP) consistent with the Regional Traffic Signal Synchronization Master Plan (RTSSMP), and a Pavement Management Plan (PMP).

RECOMMENDATIONS:
a) Determine this action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because this action will not result in a physical change to the environment, directly or indirectly; b) Adopt the Measure M2 Seven -Year Capital Improvement Program (CIP); c) Adopt Resolution No. 2023-35, A Resolution of the City Council of the City of Newport Beach, California, Concerning the Status and Update of the Circulation Element, Mitigation Fee Program, Local Signal Synchronization Plan, and Pavement Management Plan for the Measure M2 Program, and thereby adopting the updated Local Signal Synchronization Plan; and
d) Direct staff to submit all necessary material to OCTA to satisfy the FY 2023-24 Measure M2 annual eligibility requirements.

DISCUSSION:

On November 7, 2006, Orange County voters approved Ordinance No. 3, the Renewed Measure M (M2) multi -billion -dollar program extension of the original Measure M. M2 authorized the imposition of a one-half cent retail transaction and use tax for a period of 30 years, starting in 2011.
6-1

Resolution No. 2023-35: Annual Measure M2 Eligibility Submittal June 13, 2023

Page 2 ends

Current M2 legislation provides local agencies with 18% of the sales tax revenue collected under a program called "Fair Share." The distribution to each local agency is based on a formula using population, miles of existing arterial highways located within each jurisdiction, and taxable sales. A forecast of Local Fair Share Funds was released by OCTA in April of 2023 and the City' s apportionment is approximately $2.7 million in FY 2023-24 for local street projects under the Fair Share Program.

To maintain eligibility for Measure M2 funds, the City must satisfy the following requirements by June 30, 2023:

1. Adopt a Measure M2 Seven -Year CIP that includes all projects to be funded partially or fully by Measure M2 dollars (Attachment A);

2. Adopt a resolution concerning the status and update of the Circulation Element/MPAH Consistency, MFP, LSSP, and PMP for the Measure M2 Program; and

3. Submit all other required documentation required by OCTA Fiscal Year 2023-24 Measure M2 Eligibility Guidelines.

The budgets shown on the Measure M2 Seven -Year CIP for Fiscal Years 2023-2024 to 2029-2030 are estimated based on anticipated spending and historic needs. The budget for Fiscal Year 2023-2024 is included in the proposed Capital Improvement Program budget for City Council adoption on June 13, 2023. Actual budgets for future years have not yet been established. The MFP assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to new development. These Fair Share Fees are adjusted annually based on the Consumer Price Index (Attachment C). The LSSP is a three-year plan identifying the City's traffic signal synchronization, street routes, and traffic signals to be improved. An updated LSSP is required to be submitted to OCTA every three years (Attachment D).

The PMP outlines the processes in place for the planning, preventative maintenance, and repair of the City's roadways. An updated PMP report (Attachment E) is required to be submitted to OCTA on a biennial basis. This updated pavement system assessment was completed in May of 2023 and the results show that the City's overall weighted Pavement Condition Index (PCI) for the pavement network is 82, which is in the "Good" category.

This report also verified that the City's overall pavement condition meets or exceeds the City Council's goal of maintaining a citywide PCI of 80 or higher. Additionally, as a result of maintaining a network PCI of 80 or higher, the City remains eligible for a local agency match reduction of 10 percent.

A standard item included in the City's annual eligibility documentation is a Maintenance of Effort (MOE) Certification. This required certification is meant to ensure that the local jurisdiction maintains a minimum level of local street and road expenditures and that the M2 funds are used to supplement, rather than replace, local funds. The City has complied with this and all other eligibility requirements since the inception of the Measure M2 program.
6-2

Resolution No. 2023-35: Annual Measure M2 Eligibility Submittal June 13, 2023

Page 3 ends

The FY 2023-24 MOE benchmark for the City of Newport Beach was established at $14,292,404. The MOE benchmark was most recently adjusted in 2023 and is adjusted every three years. Historically, the City exceeds the benchmark by a considerable amount. Last year's MOE expenditures totaled $16.8 million.

Upon the City Council' s approval of the recommended actions, a complete submittal of the City's eligibility packet will be transmitted to OCTA by the June 30, 2023, submission deadline.

FISCAL IMPACT:

Submittal of the eligibility documentation ensures that the City will continue to receive its Fair Share portion of the Measure M2 funds, as well as allow the City to participate in receiving additional funds through the Measure M2 Competitive grant funding programs.

This amounts to several million dollars in roadway -related funding each year and is a key part of the City's roadway maintenance program. Annually, OCTA prepares a 7-year funding estimate (see table below). Year over year increases are projected around 3 percent.

Estimated Measure M2 Local Fair Share Program Funding
FY2023-24
FY2024-25
FY2025-26
FY2026-27
FY2027-28
FY2028-29
FY2029-30
7 Year
Estimate
$2,728,303
$2,831,037
$2,920,373
$3,006,962
$3,108,260
$3,208,400
$3,309,301
$21,112,636
ENVIRONMENTAL REVIEW:

Staff recommends the City Council find this action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly.

NOTICING:

The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item).

ATTACHMENTS:

Attachment A — Measure M2 Seven -Year Capital Improvement Program Attachment B — Resolution No. 2023-35
Attachment C — Mitigation Fee Program — Fair Share Fee Schedule Attachment D — Local Signal Synchronization Plan
Attachment E — Pavement Management Plan
6-3

ATTACHMENT A
Measure M Seven Year Capital Improvement Program For Fiscal Years 2023-2024 through 2029-2030 City of Newport Beach
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Estimated
Project Name
23/24
24/25
25/26
26/27
27/28
28/29
29/30
Cost
Fund Source
Various Pavement
3,285,000
3,000,000
2,930,000
2,700,000
3,000,000
2,581,000
3,000,000
20,496,000.00
M Fair Share

19.3%
Rehabilitation Projects
4,713,000
3,000,000
2,993,000
2,866,000
3,000,000
2,768,000
3,000,000
22,340,000.00
Gas Tax

21.0%
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
10,500,000.00
S61 - RMRA

9.9%
7,537,000
6,000,000
6,000,000
5,750,000
4,723,500
4,757,000
6,000,000
40,767,500.00
General Fund

38.4%
9,391,000
9,391,000.00
Neighborhood Enhancement

8.8%
650,000
650,000.00
Oceanfront Enroachment

0.6%
502,000
502,000.00
Contributions

0.5%
500,000
500,000.00
Tidelands/Tidelands Capital

0.5%
1,150,000
1,150,000.00
Water Capital Dist &Piping

1.1%
Subtotal
29,228,000
13,500,000
13,423,000
12,816,000
12,223,500
11,606,000
13,500,000
106,296,500.00
Total
100%
E
2,922,800
1,350,000
1,342,300
1,281,600
1,222,350
1,160,600
1,350,000
C / I
26, 305, 200
12 ,150, 000
12, 080, 700
11, 534, 400
11, 001,150
10, 445, 400
12,150, 000
Balboa Peninsula
$124,490
$124,490
M Comp
79%
Summer Trolley Project
$33,640
$33,640
Balboa Village Pkg Mgmt District
21 %
Subtotal
$158,130
$158,130
Total
100%
Balboa Peninsula
99,790
99,790
M Comp
29%
Summer Trolley Expansion Program
239,580
239,580
Balboa Village Pkg Mgmt District
71 %
Subtotal
339,370
339,370
Total
100%
West Coast Hwy Intersection
1,400
11,250,000
11,251,400
M Comp.
75%
Improvements and Pedestrian Bridge
0 3,000,000
3,000,000
M Fair Share
20%
0 750,000
750,000
Gas Tax
5%
Subtotal
1,400
15,000,000
15,001,400
Total
100%
Newport Bay Water Wheel
3,000
3,000
General Fund

0.16%
1,869,000
1,869,000
Contributions

99.57%
5,000
5,000
Tidelands

0.27%
Subtotal
1,877,000
1,877,000
Total
100%
Balboa Island/Corona del Mar
58,500
58,500
M Comp
90%
Microtransit Feasibility Study
6,500
6,500
Contributions
10%
Subtotal
65,000
65,000
Total
100%

TOTAL PROJECTED BUDGET
31,668,900
13,500,000
13,423,000
12,816,000
27,223,500
11,606,000
13,500,000
123,737,400
I:\Users\PBW\Shared\COUNCIL\FY 22-23\21 - Jun 13\Measure M2\M2_FY 23-24 7-yr CIP TGS TAS SM TAS v2 06/06/2023 "

CAPITAL IMPROVEMENT PROJECTS AS IDENTIFIED IN THE PROPOSED 2023-2024 CIP Measure M
General
Tidelands/
Measure M
Comp.

SB1 -
Fund
Tidelands
Transportation
Balboa Village
Total
Fair Share
(1230050,
RMRA
Gas Tax
(01201926,
Contributions
Capital
&Circulation
Parking Mgmt
1230051,
(12101)
(13501, 13801)
(10001,
District
Neighborhood
Oceanfront
Wastewater
Water Capital
(12201)
1230052:
(12601)
01201927,
10001940/
(14001)
(53501)
Enhancement
Encroachment
Enterprise
Dist & Piping
Description
�wnnsvx
01201928)
lnlnlx
(53601)
(01201938)
(71101)
(70201931)
Balboa Island Drainage Master Plan / Pum Station 19D11
Balboa Island Street and Draina a Im rovements Collins BI Beach Access Street Ends - Peninsula Point 22R12
City Bridge Maintenance 21 R13
Concrete Replacement P m Dover, Mariners, Bay Knolls
East Coast Hwy Pavement Rehab 21 R12
East Coast H Pavement Rehab 23R11
Goldenrod Pedestrian Brid a Im rovements 23R12
Irvine Avenue Pavement Rehabilitation with County 24R11 Landscape Enhancement Program 231-01 & 241-01
MacArthur Blvd Pavement Rehabilitation Jamboree to Cam
Newport Coast Dr Pavement Rehabilitation 22R14
Old Ne ort Boulevard /West Coast Hi hwa Modifications
Old Ne ort Curb/Gutter/Sidewalk Im rovements 15th St to Pavement Mana ement Plan Maintenance /Ins edion 233
Rubberized Pavement Grant Pro ram 23R02
San Mi uel Dr Pavement Rehab 23R13
Slur Seal Program 23R04
Slur Seal Program Dover, Mariners, BayKnolls 24R04
Storm Drain System Re air / Rehabilitation 23D02
Street Pavement Re air Proram 23R03
Street Pavement Re air Prorem 24R03
Streetlight Rehabilitation Program 23V02 and 24V02
Su erior Avenue and Hos ital Road Pavement Rehabilitatio Via Lido and Via O orto Intersection Improvements 24R12 Von Kaman Ave Pavement Rehab 23R15
kr wts funded by Measure M Comp,
RAhna Panin—la Snmmar Trnllwv Fxnan.,inn (i gTI1)
Balboa Peninsula Summer Trolley (17T13)
$158,130
$124,490
$33,640
Balboa Island/Corona del Mar Microtransit Feasibility Study (21 T13) 1 $65,0001
1 $58,500
$6,500
West Coast Hwy Intersection Improvements & Pedestrian Bridge (21 R16) 1 $1,400
$1,400
Subtotal
1 $563,900
$0
$284,180
$0
$01
$0
$6,500
$01
$0
$273,220
$0
$0
$0
$0

6/6/23, 3:23 PM
ocfundtracker.octa.net/CIP/report projectlisting
Orange County Transportation Authority
FY 2023/24 - FY 2029/30 Capital Improvement Program
ITIP �^ �^ �� IMPLEMENTING AGENCY Newport Beach, City
l
Local Project Number: 20-NBCH-CBT-3956
Additional Project IDs:

Type of Work: Transit
Type of Work Description: Transit - Service
Planning
Limits
Balboa Island and Corona del Mar
Project Notes
Other - Contributions.

Last Revised: 23-00 - Submitted
ITIP ID CP-10958
Project Title
Balboa Island/Corona del Mar Microtransit Feasibility Study Project Description
This project prepares a study to review the feasibility of a local transit program to serve the Balboa Island and Corona del Mar Communities.

FISCAL TOTAL

YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
2024 Other $0 $0 $0 $6,500 $6,500 $6,500
2024 PROJECT V - Community $0 $0 $0 $58,500 $58,500 $58,500 Circulators
Totals: $0 $0 $0 $65,000 $65,000 $65,000
Local Project Number: 16-NBCH-CBT-3832 Project Title
Additional Project IDs: Balboa Peninsula Trolley
Type of Work: Transit Project Description
Type of Work Description: Transit - New Service Shuttle program for the Balboa Peninsula area.

L' 't FISCAL
Total Programmed: $65,000�
IMPLEMENTING AGENCY Newport �seach, City
i
ims FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL
Balboa Peninsula YEAR ESCALATED
Project Notes 2024 PROJECT V - $0 $0 $0 $124,490 $124,490 $124,490 Community Circulators
2024 Other $0 $0 $0 $33,640 $33,640 $33,640
Totals: $0 $0 $0 $158,130 $158,130 $158,130
Last Revised: 23-00 - Submitted Total Programmed: $158,130

TIPID -- --
IMPLEMENTING AGENCY Newport Beach, City
Local Project Number: 18-NBCH-CBT-3913 Project Title
Additional Project IDs: Balboa Peninsula Trolley Expansion Type of Work: Transit Project Description
Type of Work Description: Transit - New Service Provide trolley service for an additional 5 weekends in August through to Labor Day Limits FISCAL TOTAL

FUND TYPE ENG ROW CON/IMP O&M TOTAL
Balboa Peninsula YEAR ESCALATED
Project Notes 2024 PROJECT V - Community Circulators $0 $0 $0 $99,790 $99,790 $99,790 Other: Balboa Village Parking Management District 2024 Other $0 $0 $0 $239,580 $239,580 $239,580 Last Revised: 23-00 - Submitted
Totals: $0 $0 $0 $339,370 $339,370 $3399370
Total Programmed: $339,3701
https://ocfundtracker.octa.net/CIP/report— project—listing 6-61 /4

6/6/23, 3:23 PM
TIP ID CP-11932
ocfundtracker.octa.net/CIP/report project_listing
IMPLEMENTING AGENCY NewportBeach,
Local Project Number: 20-NBCH-ECP-3986
Additional Project IDs:

Type of Work: Other
Type of Work Description: Other - Other
Limits
San Diego Creek Upstream of Jamboree Road
Bridge
Project Notes
Other - Upper Newport Bay Restoration Fund &
Contributions.

Last Revised: 23-00 - Submitted
Project Title
Newport Bay Trash Wheel
Project Description
Trash interceptor collection vessel that captures trash floating in San Diego Creek from inland Orange County into Newport Bay.

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2024 Other $0 $0 $1,874,000 $0 $1,874,000 $1,930,220
2024 General Fund $0 $0 $0 $3,000 $3,000 $3,000
Totals: $0 $0 $1,874,000 $3,000 $1,877,000 $1,933,220
Total Programmed: $1,877,0001
https://ocfundtracker.octa.net/CIP/report_project_listing 6-7 2/4

6/6/23, 3:23 PM
ocfundtracker.octa.net/CIP/report project_listing
TIP ID CP-10982
IMPLEMENTING AGENCY Newport Beach, City
of
Local Project Number: N/A
Project Title
Additional Project IDs:

Various Pavement
Rehabilitation
Projects
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance -
Various pavement
rehabilitation
projects as determined by the Pavement Management Program and Rehabilitation of roadway
field reviews
Limits
FISCAL
YEAR

FUND TYPE
ENG

ROW CON/IMP
O8M TOTAL
TOTAL

ESCALATED
Citywide
Project Notes
2024
Measure M2 Local
Fairshare
$328,500
$0
$2,956,500
$0
$3,285,000
$3,373,695
M %) LSR: SB1 Fund (10%) Share (19%) Gas Tax (19%) General Fund (39/0)
2024
Gas Tax
$471,300
$0
$4,241,700
$0
$4,713,000
$4,840,251
2024
General Fund
$753,700
$0
$6,783,300
$0
$7,537,000
$7,740,499
Local Streets and
2024
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,540,500
apportionments
2025
Measure M2 Local Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,164,430
2025
General Fund
$600,000
$0
$5,400,000
$0
$6,000,000
$6,328,860
Local Streets and
2025
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,582,215
apportionments
2025
Gas Tax
$300,000
$0
$2,700,000
$0
$3,000,000
$3,164,430
Local Streets and
2026
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,625,181
apportionments
2026
General Fund
$600,000
$0
$5,400,000
$0
$6,000,000
$6,500,726
2026
Gas Tax
$299,300
$0
$2,693,700
$0
$2,993,000
$3,242,779
2026
Measure M2 Local
Fairshare
$293,000
$0
$2,637,000
$0
$2,930,000
$3,174,521
2027
General Fund
$575,000
$0
$5,175,000
$0
$5,750,000
$6,399,508
2027
Gas Tax
$286,600
$0
$2,579,400
$0
$2,866,000
$3,189,737
2027
Measure M2 Local
Fairshare
$270,000
$0
$2,430,000
$0
$2,700,000
$3,004,986
Local Streets and
2027
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,669,437
apportionments
Local Streets and
2028
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,715,020
apportionments
2028
Measure M2 Local
Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,430,040
2028
Gas Tax
$300,000
$0
$2,700,000
$0
$3,000,000
$3,430,040
2028
General Fund
$472,350
$0
$4,251,150
$0
$4,723,500
$5,400,598
Local Streets and
2029
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,761,971
apportionments
2029
Measure M2 Local
Fairshare
$258,100
$0
$2,322,900
$0
$2,581,000
$3,031,764
2029
General Fund
$475,700
$0
$4,281,300
$0
$4,757,000
$5,587,796
2029
Gas Tax
$276,800
$0
$2,491,200
$0
$2,768,000
$3,251,423
Local Streets and
2030
Roads
$150,000
$0
$1,350,000
$0
$1,500,000
$1,810,330
apportionments
2030
Gas Tax
$300,000
$0
$2,700,000
$0
$3,000,000
$3,620,659
2030
General Fund
$600,000
$0
$5,400,000
$0
$6,000,000
$7,241,319
2030
Measure M2 Local
Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,620,659
Totals: $9,410,350 $0 $84,693,150 $0 $94,103,500 $104,443,374 Last Revised: 23-00 - Submitted Total Programmed: $94,103,500 https://ocfundtracker.octa.net/CIP/report_project_listing 6-8 3/4

6/6/23, 3:23 PM
ocfundtracker.octa.net/CIP/report project_listing
TIP ID CP-10962
IMPLEMENTING AGENCY Newport Beach, City
of
Local Project Number: 20-NBCH-ICE-3966
Project Title
Additional Project IDs:

West Coast Highway Intersection Improvements and Pedestrian Bridge Type of Work: Bridge
Project Description
Type of Work Description: Bridge - Construction
Construction of a 240 feet long bicycle and pedestrian bridge over heavily trafficked, 8 lane Superior of new bridge crossing
Avenue. Includes new landings on the south-east and north-east corners of the intersections, as well as site improvements.

Limits

FISCAL TOTAL

YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
Bridge will span Superior Ave at the intersection of
Pacific Coast Hwy and Balboa Blvd
2024 PROJECT V - $1,400 $0 $0 $0 $1,400 $1,400
Project Notes
Community Circulators
2028 PROJECT V - Community Circulators $0 $0 $11,250,000 $0 $11,250,000 $13,041,833 2028 Gas Tax $0 $0 $750,000 $0 $750,000 $869,456
2028 Measure M2 Local $0 $0 $3,000,000 $0 $3,000,000 $3,477,822 Fairshare
Last Revised: 23-00 - Submitted
Totals: $1,400 $0 $15,000,000 $0 $15,001,400 $17,390,511 Total Programmed: $15,001,400�
https://ocfundtracker.octa.net/CIP/report_project_listing 6-9 4/4

ATTACHMENT B
RESOLUTION NO. 2023- 35

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF NEWPORT BEACH, CALIFORNIA, CONCERNING

THE STATUS AND UPDATE OF THE CIRCULATION

ELEMENT, MITIGATION FEE PROGRAM, LOCAL

SIGNAL SYNCHRONIZATION PLAN, AND PAVEMENT
MANAGEMENT PLAN FOR THE MEASURE M2

PROGRAM
WHEREAS, the City of Newport Beach ("City") desires to maintain and improve the streets within its jurisdiction, including those arterials contained in.the Master Plan of Arterial Highways ("MPAH") administered by the Orange County Transportation Authority ("OCTA");
WHEREAS, the City has endorsed a definition of and process for determining consistency of the City's Traffic Circulation Plan ("Circulation Element") with the MPAH; WHEREAS, the City's Circulation Element, which is incorporated into the City's General Plan, does not preclude implementation of the MPAH within its jurisdiction; WHEREAS, the City is required to adopt a resolution biennially informing OCTA that the City Circulation Element is in conformance with the MPAH and 'whether any changes to any arterial highways of said Circulation Element have been adopted by the City during Fiscal Years (FY) 2021-22 and FY 2022-23;
WHEREAS, the City is required to send biennially to OCTA all recommended changes to the City Circulation Element and the MPAH for the purposes of re -qualifying for participation in the Comprehensive Transportation Funding Programs, which are a collection of competitive grant program comprised primarily of Measure M2 funds (an Orange County transportation sales tax) offered to local agencies to assist in funding street improvements, transit expansion and even environmental mitigation projects; WHEREAS, the City is required to adopt a resolution biennially certifying that the City has an existing Mitigation Fee Program that assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to the new development; WHEREAS, OCTA has developed the Regional Traffic Signal Synchronization Master Plan to identify traffic signal synchronization street routes and traffic signals within and across jurisdictional boundaries, and defines the means of implementing the Regional Traffic Signal Synchronization Program;
6-10

Resolution No. 2023-

Page 2 of 5 ends

WHEREAS, the Regional Traffic Signal Synchronization Program requires that local jurisdictions adopt a Local Signal Synchronization Plan consistent with the Regional Traffic Signal Synchronization Master Plan as a key component of local jurisdictions' efforts to synchronize traffic signals across local jurisdictions' boundaries; WHEREAS, the Local Signal Synchronization Plan must be updated by June 30, 2023 to continue to be eligible to receive Net Revenues as part of OCTA's Measure M2; WHEREAS, "Net Revenues" is defined by OCTA in its Measure M2 Ordinance as "[a]II of the gross revenues generated from the transactions and use tax plus any interest or other earnings thereon (collectively, "Revenues"), after the deduction for: (i) amounts payable to the State Board of Equalization for the performance of functions incidental to the administration and operation of the Ordinance, (ii) costs for the administration of the Ordinance as provided herein, (iii) two percent (2%) of the Revenues annually allocated for Environmental Cleanup, and (iv) satisfaction of debt service requirements of all bonds issued pursuant to the Ordinance that are not satisfied out of separate allocations, shall be defined as 'Net Revenues' and shall be allocated solely for the transportation purposes described in the Ordinance.";
WHEREAS, the City is required to meet eligibility requirements and submit eligibility verification packages to OCTA in order to remain eligible to receive M2 funds; WHEREAS, the City is required to adopt and update a Pavement Management Plan ("PMP"), using the required format, regarding the status of road pavement conditions and implementation of the PMP on a biennial basis; and
WHEREAS, the City is required to provide a plan that manages the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads.

NOW, THEREFORE, the City Council of the City of Newport Beach resolves as follows:

Section 1: The City Council does hereby inform OCTA that:
a) The arterial highway portion of the City's Circulation Element is in conformance with the MPAH.
6-11

Resolution No. 2023-

Page 3 of 5 ends

b) The City attests that no unilateral reduction in through lanes has been made on any MPAH arterials during FY 2021-22 and FY 2022-23.
c) The City affirms that it will bring forward requests to amend the MPAH, when necessary, in order to ensure that the MPAH and Circulation Element remain consistent.
d) The City reaffirms that the existing Mitigation Fee Program is in effect.
e) The City hereby adopts, and will maintain, the ;Local Signal Synchronization Plan presented to the City Council at the June 13, 2023, City Council Meeting, which is incorporated herein by reference, which includes goals that are consistent with those outlined as part of the Regional Signal
Synchronization Master Plan, including signal
synchronization across jurisdictions.
f) The Local Signal Synchronization Plan identifies traffic signal synchronization street routes, including all elements of the Regional Signal Synchronization Network located within the City.
g) The Local Si Synchronization nchronization Plan includes the traffic g Y
signal inventory for all traffic signal synchronization street routes.
h) The Local Signal Synchronization Plan includes a three-year plan showing capital, operations, and maintenance of signal synchronization along the traffic signal synchronization street routes and traffic signals.
i) The Local Signal Synchronization Plan includes lan update on the status and performance of traffic signal synchronization activities.
j) The Local Signal Synchronization Plan includes a discussion on the review and revision, as may be necessary, on the 6-12

Resolution No. 2023-

Page 4 of 5 ends

timing of traffic signals on the traffic signal synchronization street routes.
k) The PMP is in conformance with the PMP Submittal Template provided in the Countywide Pavement Management Plan
Guidelines.

I) The City hereby adopts the PMP presented to the City Council at the June 13, 2023, City Council meeting, which is
incorporated herein by reference, and has provided an
updated PMP report, using the required format, to OCTA. m) The City's Public Works Director, City Engineer or designee is authorized to sign the PMP certification form.

Section 2: The recitals provided in this resolution are true and correct and are incorporated into the operative part of this resolution.

Section 3: If any section, subsection, sentence, clause or phrase of this resolution is, for any reason, held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this resolution. The City Council hereby declares that it would have passed this resolution, and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional.

Section 4: The City Council finds the adoption of this resolution is not subject to the California Environmental Quality Act ("CEQA") pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly.
6-13

Resolution No. 2023-

Page 5 of 5 ends

Section 5: This resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall certify the vote adopting the resolution.

ADOPTED this 13th day of June, 2023.

NOAH BLOM
Mayor
ATTEST:

Leilani I. Brown
City Clerk
APPROVED AS TO FORM:

CITY ATTORNEY'S OFFICE
Aaron C. Harp
City Attorney
6-14

ATTACHMENT C
EW PO

CITY OF NEWPORT BEACH

PUBLIC WORKS DEPARTMENT
1 CIVIC CENTER DRIVE
C, P.O. BOX 1768, NEWPORT BEACH, CA 92659-1768
(949) 644-3311

MEMORANDUM
TO: PLANNING DEPARTMENT
FROM: TRAFFIC ENGINEER
DATE: June 23, 2022
SUBJECT: REVISED FAIR SHARE FEES — UPDATE 2022
Per City Ordinance 94-19, the Fair Share Fees are to be adjusted effective July 1 of each year based on the Consumer Price Index (the Los Angeles — Long Beach — Anaheim, All Urban Consumer Index). For 2021, the fee will be revised 8.0%, from $234.441trip to $25320/trip.

A revised Fair Share Fee Summary Table of various land uses as defined by the 1996 NBTAM is attached for your use.

If you have any questions regarding the new fee or help with fee calculations, please contact me at ext. 3329.

Antony Brine
City Traffic Engineer
Attachment
IaUsers1PBMSharedlTRAFF10Fair Share FeeVairsharememo2022.doc 6-15

FAIR SHARE FEE SUMMARY TABLE 06.23.22

FAIR SHARE FEE SUMMARY TABLE
Fair Share Fee Per Trip $263.20
USE

GEN RATE
UNIT

FEE/UNIT
1 Res-Low(SFD)

11.00 DU
$2,785
2 Res -Medium (SFA)

8.60 DU
$2,177
3 Apartment

6.50 DU
$1,646
4 Elderly Residential

4.00 DU
$1,013
5 Mobile Home

6.00 DU
$1,519
6 Motel

10.10 ROOM
$2,557
7 Hotel

10.50 ROOM
$2,659
$
Resort Hotel

6.00 ROOM
$1,519
9 Regional Commercial

22.00 TSF
$5,570
10 General Commercial

40.00 TSF
$10,128
11 Comm./Recreation

40.00 ACRE
$10,128
12 Resort Commercial '

35.00 TSF
$8,862
13 Restaurant

66.90 TSF
$16,939
14 Family Restaurant
177.87
TSF
$45,036
15 Fast Food Restaurant
142.00
TSF
$35,954
16 Auto Dealer/Sales

47.91 TSF
$12,131
17 Yacht Club

50.00 TSF
$12,660
18 Health Club

40.00 TSF
$10,128
19 Tennis Club

44.30 CRT
$11,217
20 Marina

0.50 SLIP
$127
21 Theater

1.50 SEAT
$380
22 Newport Dunes

5.70 ACRE
$1,443
23 General Office

13.00 TSF
$3,292
24 Medical Office

45.00 TSF
$11,394
25 R & D

9.50 TSF
$2,405
26Industrial

5.06 TSF
$1,266
27 Mini-Storage(VUarehouse

2.61 TSF
$661
28 Pre-School/Day Care

67.00 TSF
$16,964
29 Elementary/Private School

1.00 STU
$253
30 Junior/High School

1.40 STU
$354
31 Civic Center/Museum

32.00 TSF
$8,102
32 Library

41.80 TSF
$10,584
33 Post Office

86.80 TSF
$21,977
34 Hospital

11.40 BED
$2,886
35 Nursing/Conv. Home

2.70 PAT
$684
36 Church

7.70 TSF
$1,950
37 YouthCtr/Service

4.00 TSF
38 Park

6.00 ACRE
39 Regional Park

5.00 ACRE
U$1,266
40 Golf Course

6.00 ACRE
41 Resort Golf Course

3.00 ACRE
1:\Users\PBWIShared\TRAFFIC1Fair Share Fee1FSHARE2022UPDATE 6-16

ATTACHMENT D

LOCAL SIGNAL SYNCHRONIZATION PLAN CONSISTENCY REVIEW CHECKLIST The Local Agency Name: City of Newport Beach Plan Date: 05/30/2023 Local agencies must submit a copy of the Local Signal Synchronization Plan, a completed consistency review checklist, and any supporting documentation. Complete the table below.

Complete the table below:

Local Agency Statement
Page #s in
LSSP
Provided or NIA

1. Signal synchronization goals of the agency are consistent with those outlined as part of the Regional Traffic Signal
4-5
Provided
Synchronization Master Plan.

2. Traffic signal synchronization street routes are identified, including all corridors along the regional signal synchronization network 7 Provided
located within the local agency.

3. Traffic signal inventory for all traffic signal synchronization street 9-12
Provided
routes.

4. Three-year plan separately showing costs, available funding, and phasing for capital, operations, and maintenance of signal synchronization along the traffic signal synchronization street 14-16
Provided
routes and traffic signals for constrained, unconstrained, and build -out scenarios.

5. Signal synchronization review, revision, and assessment of synchronization activities along the traffic signal synchronization 18-20
Provided
street routes and traffic signals.

I certify that the above statements are true to the best of my knowledge.

Sig
JaMes Houlihan, Deputy PW Director/City Engineer, City of N Printed Name, Title, & Local Agency
Date
6-17

LOCAL SIGNAL SYNCHRONIZATION PLAN
.:

SECTION ONE

TRAFFIC SIGNAL SYNCHRONIZATION GOALS
6-19

Background
Continued growth in Orange County and the City of Newport Beach creates increasing demands on regional and local roadways. With this demand comes increased travel time delays, which adversely affects the community. Roadways also have modern needs to suit the community, such as future development, landscaping, and signing/striping considerations of other roadway users. These users include, but not limited to, pedestrians, both conventional and, more recently, electric bikes and scooters. As the past practice of continually widening roadways is no longer sustainable, other efficiency -inducing alternatives, such as traffic signal synchronization are required.

COVID-19 Impacts
It is important to note that there was a prolonged period of significantly lighter traffic starting in mid -March 2020 due to the statewide stay-at-home order in response to the COVID-19 global pandemic. Traffic levels continued to be lower, along with associated reduced travel times for the next year to year -and -half, even as the stay-at-home order had been lifted, due to increased telework, reduced tourism, and changes in commuting patterns. However, it is important to note that these reduced travel times do not accurately represent normal traffic conditions with such changes as both increased demand for deliveries and alternative modes of transportation. The City of Newport Beach is continually working to address these impacts with the goal to adjust traffic signal synchronization as traffic equalizes to a new altered level.

Strategies
To achieve the City of Newport Beach's goal of reducing impacts from the movement of people and goods, while balancing the needs of the community and promoting other modes of travel, the City looks to increasing the efficiency of the roadway system through key improvements and traffic signal synchronization.

Traffic Sianal Modernization Proiect
The City of Newport Beach has completed a multi -year, eight -phase Traffic Signal Modernization Project. This project included the creation of a fiber optic communication network, construction of a working Traffic Management Center (TMC) at the Civic Center, updating 122 of the City -operated traffic signals, installing 74 Closed Circuit Television Cameras (CCTV), integrating signals and CCTVs into the TMC, and training staff to operate the advanced traffic signal system.

Traffic Sianal Operations and Maintenance
The City actively operates and maintains the traffic signals by use of City Traffic Engineering Staff, contract maintenance services, and consultant services for project design and traffic signal timing. Traffic signal rehabilitation is accomplished through the City's annual Capital Improvement Program.
6-20

Traffic Signal Timing
Through the Traffic Signal Modernization Project, traffic signal timing, including corridor coordination, was reviewed and updated. Examination of traffic signal timing along arterial corridors is planned on a three-year cycle. During the review, the traffic signal timing will be checked for compliance with the latest adopted standards and updated if necessary. Regional corridors and shared intersections will include coordination with other agency stakeholders to ensure positive traffic flow across jurisdictional boundaries. Traffic signal timing will be monitored through bi-annual travel time studies and fine-tuned as necessary.

Funding
Funding for the past Traffic Signal Modernization Project has been a combination of local and Measure M1/M2 grant funding. The annual Traffic Signal Rehabilitation Projects and ongoing maintenance and operation of the traffic signal system are funded through local sources.

Conclusion
Traffic signal synchronization is a key tool for improving the efficiency of the roadway system in Newport Beach. The City is committed to ongoing efforts to improve traffic signal timing and coordination.
6-21

SECTION TWO

TRAFFIC SIGNAL SYNCHRONIZATION STREET ROUTES
6-22

LEGEND
0 COORDINATED ROUTE

COORDINATED ROUTE
(NON -CITY RIGHT-OF-WAY)

NON -COORDINATED ROUTE

UNIVERSITY DR - CITY BOUNDARY

BISON AVE
SAN
O

SECTION THREE

TRAFFIC SIGNAL INVENTORY
6-24

Traffic Synchronization Inventory
City of Newport Beach
Corridor
Cross Street Intersection
Cycle LengthEquipment

AM MID PM WKND
Maintenance
Responsibility
Cabinet
Type
Software
Detection
Bike Detection
CCTV
Power Backup
Comm
Other ITS
ATMS
Status
Avocado Avenue
Corona Del Mar Plaza
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Civic Center Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Video
Yes
Cohu
BBS
Fiber
Centracs
Online
San Miguel Road
140
140
1 150
150
1 Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Balboa Boulevard
Main Street
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
Cohu
N/A
Copper
Centracs
Online
Palm Street
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
N/A
Fiber
Bluetoad
Centracs
Online
15th Street
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
21st Street
90 110
110
120
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
22nd Street-23rd Street
90 110
110
120
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
32nd Street
Free
Free
Free
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
River Avenue
Free
Free
Free
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Bayside Drive
Marine Avenue
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Pedestrian Crossing
Free
Free
Free
Free
Newport Beach
M
Cobalt
ASC/3
Loops
Yes
N/A
N/A
Cellular
Centracs
Offline
Bayview Place
Bristol Street South
80 70
80 60
Newport Beach
Other
Cobalt
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Bayview Circle
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
N/A
Wireless
Centracs
Online
Birch Street -Mesa Drive
Acacia Street
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Birch Street
Orchard Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Wireless
Centracs
Online
Bristol Street South
80 70
80 60
Newport Beach
Other
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Bristol Street North
80 70
80 60
Newport Beach
Other
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Quail Street
65 60
65 Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
Dove Street
65 60
65 Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
Von Karman Avenue
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Copper
Centracs
Online
Bison Avenue
Country Club Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Camelback Street
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Bayswater
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
73 Freeway SB Ramps
Free
Free
Free
Free
Caltrans
170/170E
Bonita Canyon Drive
Mesa View Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Prairie Road
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Chambord
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
73 Freeway SB Ramps
Free
Free
Free
Free
Caltrans
170/170E
Campus Drive
Bristol Street North
80 70
80 60
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Quail Street
65 60
65 Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Dove Street
65 60
65 Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Airport Entrance
65 60
65 Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Martin Avenue
120
100
120
100
Irvine
2070
Von Karman Avenue
100
100
100
100
Irvine
2070
Teller Avenue
75 60
75 60
Irvine
2070
Coast Highway
Orange Street
120
100
120
100
Caltrans
2070
Prospect Street
120
100
120
100
Caltrans
2070
Superior Avenue
120
100
120
100
Caltrans
2070
Hoag Drive
120
100
120
100
Caltrans
2070
Newport Blvd SB Ramp
120
100
120
100
Caltrans
2070
Riverside Avenue
120
100
120
100
Caltrans
2070
6-25

Traffic Synchronization Inventory
City of Newport Beach
Corridor
Cross Street Intersection
Cycle LengthEquipment

AM MID PM WKND
Maintenance
Responsibility
Cabinet
Type
Software
Detection
Bike Detection
CCTV
Power Backup
Comm
Other ITS
ATMS
Status
Tustin Avenue
120
100
120
100
Caltrans
2070
Balboa Bay Club
120
100
120
100
Caltrans
2070
Dover Drive
120
100
120
100
Caltrans
2070
Bayside Drive
120
100
120
100
Caltrans
2070
Promontory Drive
120
100
120
100
Caltrans
2070
Jamboree Road
150
140
160
140
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Irvine Terrace
150
140
160
140
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Newport Center Drive
75 140
160
140
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Avocado Avenue
150
140
160
140
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
MacArthur Blvd
150
140
160
140
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Goldenrod Avenue
150
140
160
140
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Iris Avenue
150
140
160
140
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Marguerite Avenue
150
1 140
160
140
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Poppy Avenue
150
140
160
140
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Morning Canyon Road
150
140
160
140
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Cameo Shores/Highland
150
140
160
140
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Pelican Pointe Drive
150
140
160
1 140
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Newport Coast Drive
150
140
160
140
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Los Trancos
120
80 120
100
Caltrans
2070
Crystal Heights Drive
120
80 120
100
Caltrans
2070
Reef Point Drive
120
80 120
100
Caltrans
2070
Dover Drive
Cliff Drive
Free
Free
Free
I Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
16th Street/Castaways Lane
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Westcliff Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Ford Road
Southern Hills Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
BBS
Copper
Centracs
Online
Irvine Avenue
Westcliff Drive
105
110
115
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Mariners School
105
110
1 115
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Dover Drive
105
110
115
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Highland Drive
105
110
115
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Santiago Drive
105
110
115
1 Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Santa Isabel Avenue
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
University Drive
105
110
115
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Mesa Drive
105
110
115
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Orchard Drive
105
110
115
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Bristol Street South
80 70
80 60
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Jamboree Road
Back Bay Drive
70 60
80 Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Island Lagoon Drive
70 60
80 Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Santa Barbara Drive
130
120
130
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
San Joaquin Hills Road
130
120
130
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Ford Road
130
120
130
Free
Newport Beach
Other
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Bison Avenue
130
120
130
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
University Drive
130
120
130
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
10 6-26

Traffic Synchronization Inventory
City of Newport Beach
Corridor
Cross Street Intersection
Cycle LengthEquipment

AM MID PM WKND
Maintenance
Responsibility
Cabinet
Type
Software
Detection
Bike Detection
CCTV
Power Backup
Comm
Other ITS
ATMS
Status
Bayview Way
160
140
160
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Bristol Street South
160
140
160
120
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Video
Yes
Cohu
BBS
Fiber
Centracs
Online
Bristol Street North
80 70
80 55
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Video
Yes
N/A
BBS
Fiber
Centracs
Online
MacArthur Blvd
160
140
160
Free
Newport Beach
Other
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Centerpointe
160
140
160
Free
Irvine
2070
Fairchild Road
160
140
160
Free
Irvine
2070
Birch Street
160
140
160
140
Irvine
2070
Campus Drive
160
140
160
140
Irvine
2070
MacArthur Boulevard
San Miguel Road
140
140
150
150
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
San Joaquin Hills Road
160
160
180
160
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Bonita Canyon Drive
160
140
1 180
Free
I Newport Beach
Other
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Vilaggio
80 140
180
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Bison Avenue
160
140
180
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
73 Freeway Ramps
Free
Free
Free
Free
Caltrans
2070
Von Karman Avenue
120
120
120
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Birch Street
120
120
120
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Campus Drive
120
120
120
120
Irvine
2070
Newport Boulevard
28th Street
90 55
55 60
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Video
Yes
Cohu
BBS
Fiber
Centracs
Online
30th Street
90 110
110
120
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
32nd Street
90 110
110
1 120
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Finley Avenue
90 110
110
120
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Via Lido
90 110
110
120
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Hospital Road
144
150
160
150
Caltrans
2070
Newport Center Drive
Corporate Plaza Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
Civic Center Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
N/A
Copper
Centracs
Online
Newport Center Dr East-West
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Copper
Centracs
Online
Newport Center Drive E
San Miguel Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
N/A
Fiber
Centracs
Online
Santa Rosa Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
BBS
Copper
Centracs
Online
Newport Center Drive W
Santa Cruz Drive
Free
Free
Free
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
Santa Barbara Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Copper
Centracs
Online
Newport Coast Drive
Pelican Hill Road South
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Provence
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Pelican Hill Road North
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Vista Ridge Road
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Ridge Park Road
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
San Joaquin Hills Road
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Gas Recovery
90 80
80 Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Sage Hill
90 80
80 Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Bluetoad
Centracs
Online
Pelican Hill Road South
Resort at Pelican Hill
Free
Free
Free
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Villa Clubhouse
Free
Free
Free
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Placentia Avenue
Hospital Road
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Copper
Centracs
Online
15th Street
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
11 6-27

Traffic Synchronization Inventory
City of Newport Beach
Corridor
Cross Street Intersection
Cycle LengthEquipment

AM MID PM WKND
Maintenance
Responsibility
Cabinet
Type
Software
Detection
Bike Detection
CCTV
Power Backup
Comm
Other ITS
ATMS
Status
Ridge Park Road
Fire Station
Free
Free
Free
Free
Newport Beach
M
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
San Joaquin Hills Road
Santa Cruz Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Santa Rosa Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
San Miguel Road
Free
Free
Free
Free
Newport Beach
332
2070
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Crown Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Marguerite Avenue
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Spyglass Hill Road
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Beaulieu
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Ridge Park Road
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
San Miguel Drive
Pacific View Drive
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Yacht Coquette
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Video
Yes
N/A
N/A
Fiber
Centracs
Online
Spyglass Hill Road
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Port Ramsey Place
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Santa Barbara Drive
San Clemente Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Copper
Centracs
Online
Santa Cruz Drive
San Clemente Drive
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
N/A
Fiber
Centracs
Online
Superior Avenue
Ticonderoga Street
Free
Free
Free
Free
Newport Beach
P (TS1)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Hospital Road
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
Placentia Avenue
Free
Free
Free
Free
Newport Beach
Other
ASC/3
ASC/3
Loops
Yes
Cohu
BBS
Fiber
Centracs
Online
Hoag Health Care
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
ASC/3
ASC/3
Loops
Yes
N/A
BBS
Fiber
Centracs
Online
University Drive
La Vida
Free
Free
Free
Free
Newport Beach
P (TS2 Type 2)
Cobalt
ASC/3
Loops
Yes
Cohu
BBS
Copper
Centracs
Online
73 Freeway SB Ramps
Free
Free
Free
Free
Caltrans
2070
MacArthur Blvd SB Ramps
Free
Free
Free
Free
Caltrans
2070
12 6-28

SECTION FOUR

TRAFFIC SIGNAL SYNCHRONIZATION SYSTEM AND THREE-

YEAR PLAN
6-29

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Constrained)
Reporting Jurisdiction Expenditures: City of Newport Beach Type of Traffic Signal Synchronization Expenditures in Year of Expenditure Dollars

MAINTENANCE

PROJECT
FY23/24
FY24/25
FY25/26
TOTAL
Ongoing Equipment and Communication
Maintenance
$540,000
$540,000
$540,000
$1,620,000
Subtotal Maintenance
$540,000
$540,000
$540,000
$1,620,000

CONSTRUCTION

PROJECT
FY23/24
FY24/25
FY25/26
TOTAL
Annual Traffic Signal Rehabilitation Project
$1,000,000
$750,000
$750,000
$2,500,000
Subtotal Construction
$1,000,000
$750,000
$750,000
$2,500,000

OPERATIONS

PROJECT
FY23/24
FY24/25
FY25/26
TOTAL
Subtotal Operations
$1,540,000
$1,290,000
$1,290,000
$4,120,000
6-30

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Unconstrained) Reporting Jurisdiction Expenditures: City of Newport Beach Type of Traffic Signal Synchronization Expenditures in Year of Expenditure Dollars

MAINTENANCE

PROJECT
FY23/24
FY24/25
FY25/26
TOTAL
Ongoing Equipment and Communication
Maintenance
$540,000
$540,000
$540,000
$1,620,000
Subtotal Maintenance
$540,000
$540,000
$540,000
$1,620,000

CONSTRUCTION

PROJECT
FY23/24
FY24/25
FY25/26
TOTAL
Annual Traffic Signal Rehabilitation Project
$1,000,000
$750,000
$750,000
$2,500,000
Subtotal Construction
$1,000,000
$750,000
$750,000
$2,500,000

OPERATIONS

PROJECT
FY23/24
FY24/25
FY25/26
TOTAL
Subtotal Operations
$1,540,000
$1,290,000
$1,290,000
$4,120,000
6-31

LSSP IMPLEMENTATION — CANDIDATE SIGNAL

SYNCHRONIZATION PROJECTS WITH ESTIMATED COSTS
Reporting Jurisdiction Expenditures: City of Newport Beach This includes potential signal synchronization -related upgrades and their respective estimated costs. These corridors are either currently uncoordinated or would benefit from incorporated improvements and provide existing corridors with improved compatibility, increased functionality, and reliability.

CORRIDOR

IMPROVEMENT SUMMARY

ESTIMATED
COST
Newport Boulevard at
28th Street & at 21st
Street
Installation of dynamic / changeable
message signs with luminaires, associated
electrical connections, and integration into
TMC
$175,000
Newport Center Drive —
Entire Loop
Installation of new conduit, fiber optic cable
upgrades, and integration into TMC
$250,000
Newport Beach Civic
Center (benefits all
corridors)
Upgrade / Modernization of Traffic
Management Center (TMC) within the
Newport Beach Civic Center
$500,000
Total Estimated Cost
$925,000
6-32

SECTION FIVE

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT REVIEW

AND REVISE, AS MAY BE NECESSARY, THE TIMING OF

TRAFFIC SIGNALS
Significant timing plan updates and projects completed
FY 2020/2021 through 2022/2023
6-33

Completed in FY16-17, the eight -phase, multi -year Traffic Signal Modernization Program has been the City of Newport Beach project to update traffic signal equipment, communication infrastructure and traffic signal timing to achieve the goal of synchronizing city -operated traffic signals. The project included equipment, communication, and signal timing updates at a total of 120 signalized intersections and installation of 43 CCTV cameras. As these program projects were completed with local funds, or through the original Measure M grant program, the City measured project success qualitatively.

Considering many of the City's arterials were coordinated prior to the modernization project, the improvements to travel times have not been significant for daily commuters.

Instead, the system has allowed for additional coordination patterns, fine-tuning and monitoring of the coastal areas during the peak season. Through use of the system, traffic engineering staff is better able to manage seasonal peaks and incidents. Additionally, there have been noticeable improvements in system reliability, incident/malfunction response time, and incident/special event support. The modern system has also allowed staff to further fine-tune the system through easier access and control.

Through the City's TMC, traffic engineering staff actively monitors, manages, and optimizes signal timing via Centracs, an advanced traffic management system (ATMS).

Signal maintenance provides continual operational functionality of field equipment. The traffic signal timing will be fine-tuned as necessary as bi-annual travel time studies and Corridor Synchronization Performance Index (CSPI) rankings provide corridor performance baselines and evaluation methodologies.

In-depth review of coordination and arterial corridor traffic signal timing along with arterial corridors are planned on a three-year cycle. During the review, the traffic signal timing will be checked for compliance with the latest adopted standards and updated if necessary.

The annual traffic signal rehabilitation projects provide ongoing maintenance and operation of the traffic signal system. Regional corridors and shared intersections will include coordination with other agency stakeholders to ensure positive traffic flow across jurisdictional boundaries.
6-34

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT, REVIEW AND REVISION 19 6-35

COAST

COLLEGE
MICH

COSTA '
w UANGUA D pF �.�P 0 6 v �
MESA a UNIVE V �gQSP O� Q73TOl c �P
WILSON `L �Sq � UNIVERSI
VICTORIA = if, CONCORDIA
rL UNIVERSITY
QO �� IRVINE A
m(if �Q� 221p Ca , CPMPUS
= rq l O 4 r
19TH

UNIV OF

CALIFORNIA-IRVINE
N
17TH BISO
IRVINE
BONITA CANY ON J����
SygDy �
. q FORD n� CgNyON
70 ti
\GJ�� FASHION Z
a BLAND P� 0
00 f f O
LJ P >
G �

SAN JOAO IN HILLS
I
Corridor Synchronization
Performance Index
Tier V Less than 50
Tier IV 50 to 60
Tier 111 60.01 to 70
Tier 11 70.01 to 80
Tier I More than 80
— Cuglole L orrluor
— Currently Funded Corridor
Source: OCTA; Data current as of September 2022.

Please check with OCTA prior to CTFP Call for Projects
* Eligible for funding upon completion per CTFP Guidelines 0 O1 F
(VnVI Miles
Pacific Ocean

NEWPORT BEACH
6-36
1323.mxd

ATTACHMENT E
rc
IQPxoRT�"
City of Newport Beach
Pavement
Management Plan
Prepared by: GMU
Submitted to OCTA: 6-30-2023
OCTA
6-37

MPavement Management Plan Agency Submittal
OGTA
Agency Submittal Table of Contents
I.

Pavement Management Plan Certification..................................................................................................... 2 II.

Executive Summary......................................................................................................................................... 3 III.

Background (Optional)....................................................................................................................................5 IV.

Current Pavement Conditions (PCI)................................................................................................................ 7 V.

Projected Pavement Conditions(PCI)............................................................................................................. 7 VI.

Alternative Funding Levels.............................................................................................................................. 8 Maintain Existing Average Network PCI.......................................................................................................... 8 Improve Average Network PCI......................................................................................................................... 8 VI I.

Current and Projected Backlog by Year of Pavement Maintenance Needs ................................................... 9 VIII.

Centerline Mileage..........................................................................................................................................9 IX.

Percentage of Network in Each of Five Condition Categories Based on Centerline Miles ........................... 10 X.

Reduction in Local Match.............................................................................................................................. 11 XI.

Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected FundingLevel................................................................................................................................................ 12 XII.

Appendix B — Complete Listing of Current Street Conditions....................................................................... 13 XIII.

Appendix C — GIS Digital Data....................................................................................................................... 14 Introduction................................................................................................................................................... 14 Structureof GIS Data..................................................................................................................................... 14 XIV.

Appendix D — Quality Assurance/Quality Control Plan................................................................................. 16 Introduction................................................................................................................................................... 16 Objectives...................................................................................................................................................... 16 Structureof QA/QC Plan................................................................................................................................ 16 Condition Survey Procedures......................................................................................................................... 17 Accuracy Required for Data Collection.......................................................................................................... 18 Random and Systematic Re-Inspections........................................................................................................ 18 PCI Comparison with Past Surveys................................................................................................................. 19 Inspector's Qualifications and Experience..................................................................................................... 20 SafetyProcedures.......................................................................................................................................... 20 XV.

Appendix E — Pavement Management Data Files......................................................................................... 21 XVI.

Appendix F — GIS Maps — Current Conditions (Optional).............................................................................. 21 1
6-38

Pavement Management Plan Agency Submittal
I. Pavement Management Plan Certification
The City of Newport Beach certifies that it has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M2.

The plan was developed by Newport Beach* using PAVER, a pavement management system, conforming to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements:
• Inventory of MPAH and local routes reviewed and updated biennially. The last update of the inventory was in February 2023 for Arterial (MPAH) streets and local streets. • Assessment of pavement condition for all routes in the system, updated biennially. The last field review of pavement condition was completed on February 2023.
• Percentage of all sections of pavement needing:
o Preventative Maintenance: 22%
o Rehabilitation:22%
o Reconstruction:1%
• Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient sections of pavement for:
o Current biennial period: $40.8 million
o Following biennial period: $17.2 million
• Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or Reconstruction:
o Current biennial period: $15.8 million
o Following biennial period: $15.8 million
• Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs. • The Pavement Management Plan is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors.
*An electronic copy of the Pavement Management Plan (with Micro Paver compatible files) has been, or will be, submitted with the certification statement.

A copy of this certification is being provided to the Orange County Transportation Authority.

Submitted by:

Jim Houlihan, P.E.

City of Newport Beach
Jurisdiction
Date
Title (Public Works Director and/or City Engineer)
P a g e 12 6-39

MPavement Management Plan Agency Submittal
OCTA
II. Executive Summary
The City of Newport Beach performs a routine update of its Pavement Management Plan (PMP) in order to assist policy makers in making decisions for road maintenance budgets as well as to comply with the Orange County Transportation Authority (OCTA) Measure M2 Program. This report summarizes the findings and conclusions from the 2023 PMP Update.

The City is responsible for maintaining approximately 204.9 centerline miles of streets, comprising of approximately 156.7 centerline miles of local streets and approximately 48.2 miles of MPAH. To monitor and analyze this vast network of streets and pertinent information, the City performs pavement management plan studies and utilizes PAVER pavement management software. The City collects pavement distresses in compliance with the American Society of Testing and Materials standard ASTM D6433, as required by the Orange County Transportation Authority.

The condition of Master Plan of Arterial Highway (MPAH) streets is surveyed and updated on biennial basis, whereas the condition of local streets located in Zones 1-3 is surveyed every odd year, and condition of local streets in Zones 4-7 is surveyed in even years. The current year marks the time to update the PMP with the condition of MPAH streets and local streets located in Zones 1-3. This report represents the findings of the 2023 PMP update for the City of Newport Beach.

Table 1 below summarizes the current City of Newport Beach network's Pavement Condition Index (PCI) breakdown by functional classification.

Table 1. Network PCI Breakdown by Functional Classification The current citywide weighted average Pavement Condition Index (PCI) of the City of Newport Beach is 82.

Overall, approximately 74% (by area) of the City's road network is in the "Very Good" and "Good" condition, approximately 25% of the roads are in the "Fair" and "Poor" condition categories, and the remaining 1% are in the "Very Poor" Category.

The following three budget scenarios were evaluated as part of this study.

Scenario 1: Current Funding Level ($ 7.9 million / Year) The current allocated budget for City of Newport Beach roadway rehabilitation projects is $7.9 million, and is comprised of $1.0 million from General Funds, $3.0 million from Measure M2, $2.4 million from the Gas Tax, and $1.5 million from Senate Bill-1 (SB-1).

With this funding level, the network PCI is expected to decrease from its current 82 to a PCI of 78 by fiscal year 2029/30. Approximately 66% of the network will be in the "Very Good" and "Good" condition categories, 32%

Page 13 ends

. KE

M
OCTA
Pavement Management Plan Agency Submittal
will be in the "Fair" and "Poor" condition categories, and 2% of the sections will be in the "Very Poor" Category.

The deferred maintenance will increase to $45.0 million by year fiscal year 2029/30.

Scenario 2: Maintain Current Network PCI at 82 ($12.5 million per year) To maintain the current network PCI at 82, the city would need to spend $12.5 million annually over the next seven years. The total required budget over the next 7 years for this scenario is $87.5 million.

In this scenario, the street network will consist of approximately 77% of streets with "Very Good" and "Good" condition categories, 21% will be in the "Fair" and "Poor" condition categories, and the remaining 2% will be in the "Very Poor" Category. The deferred maintenance will decrease to $23.2 million.

Scenario 3: Increase Network PCI by One Point ($14.0 million per year) To increase the current network PCI by one point (i.e., PCI of 83), the City would need to fund $14.0 million annually over the next seven years. In this scenario, the street network will consist of approximately 79% of streets in the "Very Good" and "Good" condition categories, 20.0% will be in the "Fair" and "Poor" condition categories, and the remaining 1.0% will be in the "Very Poor" Category. The deferred maintenance will decrease to $8.1 million.

Based on the analysis and results of study, GMU recommends the following:
- Fund at least the "Current Funding Scenario" level over the next seven years in order to maintain eligibility for CTFP Measure M2 10% reduction in local matching funds. Monitor construction costs for consideration in future pavement management plan updates. - Continuously update the Maintenance and Rehabilitation (M&R) history of all the streets in the network - Perform project -level studies in order to develop site -specific pavement recommendations. Consider incorporating additional pavement maintenance and rehabilitation strategies that reuse in -place materials, such as Full Depth Reclamation (FDR) or Cold Recycled AC, which can help reduce pavement maintenance/repair costs.
- Update the pavement management plan as required by OCTA to help ensure that Measure M2 funds are not jeopardized.

Page 14 ends

6-41

M
OGTA
III. Background (Optional)
Pavement Management Plan Agency Submittal
Maintaining a citywide street network is a complex undertaking. It involves many layers of information that can have a significant impact on pavement performance and cost. Some of these layers of information include:
• Funding: The amount of funding impacts the amount of pavement improvement projects that can be carried out.
• Pavement age and work history: The city's streets were constructed at different times and received different maintenance and rehabilitation activities over time. Differences in age and repairs will impact the pavement's current and future condition.
• Pavement inventory: An inventory of streets defines the limits of the study and what the City is responsible for maintaining. Working with an updated pavement inventory will also allow for more accurate budget scenario analysis.
• Historical costs for various types of repairs: Past pavement maintenance/rehabilitation costs are reviewed and updated to more accurately budget for future pavement maintenance/rehabilitation costs.
• Current pavement condition: To objectively rate the pavement's condition, the roadway is surveyed by an OCTA-certified pavement inspector in accordance with ASTM D 6433 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys.
• Predicted pavement condition: To understand the projected pavement condition, which will differ depending on the amount of available budget.

The above information was identified, analyzed, and summarized into this 2023 Pavement Management Plan Update report. This report should be considered a tool for decision makers to use when deciding the amount of funding to allocate towards pavement maintenance and rehabilitation.

The most cost-effective method for roadway maintenance is to keep them in "good" or better condition. Just like doing oil changes for vehicles, proactive pavement maintenance (i.e., slurry sealing) will help keep future repair costs down. Eventually, after so many oil changes, more costly but still relatively inexpensive repairs will be due (i.e., rehabilitation or mill -and -overlays). The most expensive approach is to "do-nothing" or defer maintenance substantially such that complete replacement will be the only option left to restore the pavement condition. The following graph illustrates this concept further. 5 6-42

M
OCTA
10 Very Goad
s
Goad
75 C Fair
O
0 O
+� Poor
e
a�
E 40
Very Poor
Pavement Management Plan Agency Submittal
Pavement Condition Index

50.35 - $0.401 SF

TIMELY PAVEMENT

PRESERVATION
.........................
$14 - $19 P SF

AC RECONSTRUCTION
$291 SF

PCC RECONSTRUCTION
$3.60 - $6.506* r— f SF

PAVEMENT
— REHABILJITATION —I
Age of Pavement
The x-axis represents the age of roadway and y-axis represents pavement condition (Pavement Condition Index).

Following a proactive maintenance schedule ("timely pavement maintenance curve") will help reduce pavement costs by several folds relative to the "reactive rehabilitation" or "pavement reconstruction" curves.

Page 16 ends

6-43

M
OCTA
Pavement Management Plan Agency Submittal
IV. Current Pavement Conditions (PCI)
82 81 82
V. Projected Pavement Conditions (PCI)
Fiscal Year
Today
Current Funding
$7.9 million
Entire Network
PCI
82 MPAH
81 Local
82 2023-24
$7.9 million
83 84
83 2024-25
$7.9 million
82 83
81 2025-26
$7.9 million
81 84
80 2026-27
$7.9 million
80 84
78 2027-28
$7.9 million
80 83
77 2028-29
$7.9 million
79 84
76 2029-30
$7.9 million
78 84
75

Page 17 ends

MPavement Management Plan Agency Submittal
OCTA
VI. Alternative Funding Levels
Maintain Existing Average Network PCI
Year
Today
Funding
NeededFiscal
$12.5 million
Entire Network
PCI
82 PA
81 82
2023-24
$12.5 million
84 83
84 2024-25
$12.5 million
84 81
85 2025-26
$12.5 million
84 82
85 2026-27
$12.5 million
83 82
84 2027-28
$12.5 million
83 83
82 2028-29
$12.5 million
83 85
82 2029-30
$12.5 million
82 84
81 Improve Average Network PCI
Fiscal Year
Today
Funding Needed
$14.0 million
Entire Network
PCI
82 MPAH
81 Local
82 2023-24
$14.0 million
84 83
85 2024-25
$14.0 million
84 81
86 2025-26
$14.0 million
84 83
85 2026-27
$14.0 million
84 84
84 2027-28
$14.0 million
83 84
83 2028-29
$14.0 million
84 84
83 2029-30
$14.0 million
83 84
82 P a g
6-45

MPavement Management Plan Agency Submittal
OCTA
VII. Current and Projected Backlog by Year of Pavement Maintenance Needs
Year
Current
Current Funding
BacklogFiscal

35.6 Maintain PCI Backlog

35.6 Increase PCI Backlog

35.6 2023-24

27.7 42.1

40.6 2024-25

27.1 38.1

35.0 2025-26

31.4 37.0

31.0 2026-27

32.9 32.6

24.4 2027-28

37.9 30.6

19.5 2028-29

41.6 27.6

14.7 2029-30

45.0 23.2

8.1 VIII. Centerline Mileage
Entire Pavement Network I MPAH Local Roads

Page 19 ends

. 1 .

MPavement Management Plan Agency Submittal
OCTA
IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles
Condition
Percent
Area
Area of
Percent
Centerline
Centerline
Category
PCIRange
Network
of
Total
Pavement
Pavement
(SF)
Mileage of
Network
Mileage of
Network
&
MPAH
2O.5%
9,548,663

24.8 Very Good
86-100

51.0%
Local

30.6%
14,248,278

79.6 MPAH

6.6%
3,100,938

8.1 Good
75-85

24.7%
Local

16.6%
7,739,935

42.6 MPAH

8.3%
3,875,259

11.1 Fair
60-74

17.4%
Local

9.7%
4,521,536

24.6 MPAH

3.7%
1,746,700

3.8 Poor
41-59

5.7%
Local

3.1%
1,443,682

7.9 MPAH

0.2%
70,294

0.4 Very Poor
0-40

1.2%
Local

0.7%
336,961

2.0 TOTAL
100%
46,632,247
100%
204.9

Page 1 ends

6-47

M
OCTA
X. Reduction in Local Match
Pavement Management Plan Agency Submittal
A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local street categories;
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in "good condition".

If applicable, please use the space below to justify the local agency's eligibility for a reduction in Local Match based on the statement above.

The City of Newport Beach has met both criteria above by having an average weighted PCI of 82, and at the same time by showing measurable improvement from the previous reporting period. Therefore, the City continues to remain eligible for M2 funding.
11 MPavement Management Plan Agency Submittal
OCTA
XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level
The seven-year plan for road maintenance and rehabilitation should be based on current and projected budget.

Street sections selected for treatment should be identified here. Specific data to be submitted should follow the format below:

MPAH
Limits of Work
Street Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
LOCAL
Limits of Work
Street Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
Please attach the seven-year road maintenance and rehabilitation plan, following the above template, after this sheet. The plan should be labeled Appendix A.

Page 1 ends

Appendix A 4000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Balboa Blvd W EB
14th St
12th St
880
24 21,120
Mill and Overlay
$131,457
2023
Campus Dr EB
Von Karman Ave
Teller Ave
1,315
36 47,340
Mill and Overlay
$294,562
2023
Newport Blvd SB
28th St
26th St
410
41 16,810
Reconstruction
$133,225
2023
Newport Center Dr W SB
Santa Cruz Or
Santa Barbara Dr
1,063
36 40,018
Mill and Overlay
$240,594
2023
Superior Av NB
Coast Highway West
Ticonderga St
1,468
1 38
55,784
Reconstruction
$440,712
1 2023
Bristol St South
Birch St
Cypress St
661
50 31,550
Reconstruction
$253,199
2023
Bristol St South
Cypress St
Spruce Ave
825
34 31,350
Mill and Overlay
$201,342
2023
Coast Highway E SB
Irvine Ter
Newport Center Dr
1,100
46 55,600
Reconstruction
$650,524
2023
Newport Blvd SB
Newport Channel Bridge
Via Lido
546
42 22,932
Mill and Overlay
$137,917
2023
Newport Center Dr E SB
Anacapa Or
Newport Center Dr
754
36 29,144
Mill and Overlay
$175,218
2023
San Miguel Dr NB
Yacht Coquette (North End)
Spyglass Hill Rd/Eastgate Dr
1,494
29 45,326
Reconstruction
$417,577
2023
Balboa Blvd NB
44th St
Coast Highway
820
35 28,700
Slurry Seal
$11,480
2023
Balboa Blvd SB
Coast Highway
46th St
417
35 14,595
Slurry Seal
$5,838
2023
Balboa Blvd E EB
Island Ave
Medina Way
515
44 21,910
Slurry Seal
$8,764
2023
Balboa Blvd E WB
Medina Way
Island Ave
520
40 20,800
Slurry Seal
$8,320
2023
Balboa Blvd W EB
16th St
14th St
951
24 22,824
Slurry Seal
$9,130
2023
Balboa Blvd W EB
12th St
8th St
1,800
50 89,000
Slurry Seal
$35,600
2023
Balboa Blvd W EB
8th St
6th St
893
1 42
36,506
Slurry Seal
$14,603
2023
Balboa Blvd W EB
6th St
Island Ave
450
42 18,400
Slurry Seal
$7,360
2023
Balboa Blvd W WB
Island Ave
6th St
390
40 15,100
Slurry Seal
$6,040
2023
Balboa Blvd W WB
6th St
8th St
895
40 34,800
Slurry Seal
$13,920
1 2023
Balboa Blvd W WB
8th St
12th St
1,790
40 70,600
Slurry Seal
$28,240
2023
Balboa Blvd W WB
14th St
16th St
951
24 22,824
Slurry Seal
$9,130
2023
Balboa Blvd W WB
21st St
23rd St
600
42 21,000
Slurry Seal
$8,400
2023
Bristol St South
Spruce Ave
Bayview PI
807
1 50
42,750
Slurry Seal
$17,100
2023
Campus Dr EB
Bristol St North
Quail St
950
41 40,450
Slurry Seal
$16,180
2023
Campus Dr EB
Quail St
Dove St
1,325
42 58,150
Slurry Seal
$23,260
2023
Campus Dr EB
Dove St
Airport
1,850
42 81,300
Slurry Seal
$32,520
2023
Campus Dr EB
Airport
MacArthur Blvd
420
62 26,040
Slurry Seal
$10,416
2023
Campus Dr EB
MacArthur Ct
Von Karman Ave
1,029
36 37,044
Slurry Seal
$14,818
2023
Campus Dr EB
Teller Ave
Jamboree Rd
700
33 26,600
Slurry Seal
$10,640
2023
Dover Dr NB
Coast Highway
Cliff Dr
957
39 40,823
Slurry Seal
$16,329
2023
Dover Dr NB
Cliff Dr
Castaways Ln
1,236
30 39,080
Slurry Seal
$15,632
2023
Dover Dr NB
Castaways Ln
Westcliff Dr
1,270
30 44,100
Slurry Seal
$17,640
2023
Dover Dr SB
Westcliff Dr
16th St
1,290
33 44,070
Slurry Seal
$17,628
1 2023
Dover Dr SB
16th St
Cliff Dr
1,250
30 37,500
Slurry Seal
$15,000
2023
Dover Dr SB
Cliff Dr
Coast Highway
989
41 52,549
Slurry Seal
$21,020
2023
Irvine Ave
16th St
Mariners Dr
2,600
34 88,400
Slurry Seal
$35,360
2023
Irvine Ave
Mariners Dr
Dover Dr
1,213
32 38,816
Slurry Seal
$15,527
2023
Irvine Ave
Dover Dr
Linda Ln
645
34 21,930
Slurry Seal
$8,772
2023
Irvine Ave
Linda Ln
Baycrest Rd
1,085
34 36,890
Slurry Seal
$14,756
2023
Irvine Ave
Santiago Dr
23rd St
1,573
77 103,606
Slurry Seal
$41,443
2023
Irvine Ave
23rd St
Santa Isabel Ave
1,500
76 114,000
Slurry Seal
$45,600
2023
Irvine Ave
Santa Isabel Ave
University Dr
2,630
28 96,800
Slurry Seal
$38,720
2023
Irvine Ave
Mesa Dr
Bristol St South
3,140
42 129,900
Slurry Seal
$51,960
2023
Irvine Ave
Baycrest Rd
Francisco Dr
1,227
38 46,626
Slurry Seal
$18,651
2023
Irvine Ave
I Francisco Or
Santiago Dr
991
38 37,658
Slurry Seal
$15,063
2023
Irvine Ave
ISantiago Dr
Francisco Dr
996
38 37,848
Slurry Seal
$15,139
1 2023
Irvine Ave
I Francisco Or
Baycrest Rd
1,223
38 46,474
Slurry Seal
$18,590
12023
6-50
Appendix A - MPAH

Page 1 of 7 ends

Appendix A AVEE„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Irvine Ave
300' S of Monte Vista Ave
Santa Isabel Ave
1,049
28 29,372
Slurry Seal
$11,749
2023
Irvine Ave

BRISTOL ST

MESA DR
3,140
42 131,880
Slurry Seal
$52,752
2023
Irvine Ave
Baycrest Rd
Santiago Dr
2,170
38 82,460
Slurry Seal
$32,984
2023
Jamboree Rd NB
Coast Highway East
Back Bay Dr
990
53 37,014
Slurry Seal
$14,806
2023
Jamboree Rd NB
Back Bay Dr
Island Lagoon Dr/Hyatt Newporter
675
61 1 42,175
Slurry Seal
$16,870
2023
Jamboree Rd NB
Island Lagoon Dr/Hyatt Newporter
Santa Barbara Or
3,100
46 155,600
Slurry Seal
$62,241
2023
Jamboree Rd NB
Santa Barbara Dr
San Joaquin Hills Rd
945
47 46,415
Slurry Seal
$18,566
2023
Jamboree Rd NB
San Joaquin Hills Rd
Ford Rd
2,608
46 127,968
Slurry Seal
$51,188
2023
Jamboree Rd NB
Ford Rd
Bison Ave
3,244
46 152,424
Slurry Seal
$60,970
2023
Jamboree Rd NB
Bison Ave
University Dr/Eastbluff Dr
3,080
46 144,680
Slurry Seal
$57,872
2023
Jamboree Rd NB
University Dr/Eastbluff Dr
Bayview Way
1,735
57 83,439
Slurry Seal
$33,376
2023
Jamboree Rd SB
Fairchild Rd
Koll Center
699
58 42,542
Slurry Seal
$17,017
2023
Jamboree Rd SB
University Dr/Eastbluff Dr
Bison Ave
3,030
1 46
151,880
Slurry Seal
$60,753
2023
Jamboree Rd SB
Bison Ave
Ford Rd/Eastbluff Dr
3,205
46 154,430
Slurry Seal
$61,773
2023
Jamboree Rd SB
Ford Rd/Eastbluff Or
San Joaquin Hills Rd
2,625
46 128,450
Slurry Seal
$51,380
2023
Jamboree Rd SB
San Joaquin Hills Rd
Santa Barbara Dr
920
46 51,920
Slurry Seal
$20,768
2023
Jamboree Rd SB
Santa Barbara Dr
Island Lagoon Dr/Hyatt Newporter
3,135
46 146,710
Slurry Seal
$58,684
2023
Jamboree Rd SB
Island Lagoon Dr/Hyatt Newporter
Back Bay Dr
635
46 31,460
Slurry Seal
$12,584
2023
Jamboree Rd 5B
Back Bay Dr
Coast Highway East
1,030
45 53,350
Slurry Seal
$21,340
2023
MacArthur Blvd NB
Coast Highway East
San Miguel Dr
2,843
34 105,712
Slurry Seal
$42,285
2023
MacArthur Blvd NB
San Miguel Dr
San Joaquin Hills Rd
1,463
1 46
74,798
Slurry Seal
$29,919
2023
MacArthur Blvd NB
San Joaqin Hills Rd
3400' N of San Joaqin Hills Rd
3,400
44 151,350
Slurry Seal
$60,541
2023
MacArthur Blvd NB
3400' N of San Joaqin Hills Rd
Bonita Canyon Dr/Ford Rd
2,600
44 140,900
Slurry Seal
$56,360
2023
MacArthur Blvd SB
Bonita Canyon Dr
2600' S Bonita Canyon Dr
2,600
46 125,600
Slurry Seal
$50,240
2023
MacArthur Blvd SB
2600' S Bonita Canyon Dr
San Joaqin Hills Rd
3,400
46 171,400
Slurry Seal
$68,561
2023
MacArthur Blvd SB
San Joaquin Hills Rd
San Miguel Or
1,533
44 74,952
Slurry Seal
$29,981
2023
MacArthur Blvd SB
San Miguel Dr
Coast Highway East
2,809
34 125,006
Slurry Seal
$50,003
2023
Newport Blvd NB
21st St/Balboa Blvd West
23rd St
529
36 20,844
Slurry Seal
$8,338
2023
Newport Blvd NB
32nd St
Finley Ave
420
52 20,880
Slurry Seal
$8,352
2023
Newport Blvd NB
Finley Ave
Via Lido
502
42 21,084
Slurry Seal
$8,434
2023
Newport Blvd SB
Finley Ave
32nd St
460
42 21,820
Slurry Seal
$8,728
2023
Newport Blvd SB
32nd St
30th St
504
35 17,640
Slurry Seal
$7,056
2023
Newport Blvd SB
26th St
23rd St
540
32 17,280
Slurry Seal
$6,912
2023
Newport Blvd SB
Via Lido
Finley Ave
513
42 21,546
Slurry Seal
$8,618
2023
Newport Center Dr E NB
Anacapa Or
San Miguel Or
830
36 31,630
Slurry Seal
$12,652
2023
Newport Center Dr E NB
San Miguel Dr
Santa Rosa Dr
1,199
36 44,664
Slurry Seal
$17,866
2023
Newport Center Dr E SB
Santa Cruz Or
Santa Rosa Dr
1,403
36 53,008
Slurry Seal
$21,203
2023
Newport Center Dr E SB
Santa Rosa Or
San Miguel Or
1,135
36 43,360
Slurry Seal
$17,344
2023
Newport Coast Dr NB
Coast Highway East
Pelican Hill Rd South
1,849
41 80,809
Slurry Seal
$32,324
2023
Newport Coast Dr NB
Pelican Hill Rd N/Ocean Ridge Dr
Vista Ridge Rd/Pacific Pine Dr
3,388
41 140,908
Slurry Seal
$56,364
2023
Newport Coast Dr NB
Vista Ridge Rd/Pacific Pine Dr
Ridge Park Rd
1,102
41 46,932
Slurry Seal
$18,773
2023
Newport Coast Dr NB
Ridge Park Rd
San Joaquins Hills Rd
1,115
41 59,965
Slurry Seal
$23,986
2023
Newport Coast Dr SB
Provence
Pelican Hill Rd South
1,581
41 1 70,821
Slurry Seal
$28,329
2023
Newport Coast Dr SB
Pelican Hill Rd South
Coast Highway East
1,849
41 83,809
Slurry Seal
$33,524
2023
San Joaquin Hills Rd EB
MacArthur Blvd
San Miguel Dr
983
40 44,320
Slurry Seal
$17,728
2023
San Joaquin Hills Rd EB
Marguerite Ave
Spyglass Hill Rd
2,801
41 116,841
Slurry Seal
$46,737
2023
San Joaquin Hills Rd EB
Spyglass Hill Rd
Newport Ridge Dr West
1 4,345
33 152,385
Slurry Seal
$60,955
2023
San Joaquin Hills Rd EB
Newport Ridge Dr East
Newport Coast Dr
1,050
33 41,125
Slurry Seal
$16,450
2023
San Joaquin Hills Rd WB
ISpyglass Hill Rd
I Marguerite Ave
2,759
1 41
115,619
1 Slurry Seal
$46,248
2023
San Joaquin Hills Rd WB
ISan Miguel Dr
I MacArthur Blvd
965
1 41
41,565
1 Slurry Seal
$16,626
2023
6-51
Appendix A - MPAH

Page 2 of 7 ends

Appendix A AVEE„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
San Miguel Or NB
MacArthur Blvd
San Joaquin Hills Rd
1,285
31 45,335
Slurry Seal
$18,134
2023
San Miguel Dr SB
Harbor Woods PI
Pacific View Dr
505
29 15,645
Slurry Seal
$6,258
2023
San Miguel Or SB
San Joaquin Hills Rd
MacArthur Blvd
1,240
30 41,200
Slurry Seal
$16,480
2023
Superior Av NB
Placentia Ave
City Limit
1,750
38 66,500
Slurry Seal
$26,600
2023
Westcliff Or EB
Irvine Ave
Dover Or
1,703
1 25
42,575
Slurry Seal
$17,030
2023
Westcliff Or WB
Dover Dr
Irvine Ave
1,695
25 42,375
Slurry Seal
$16,950
2023
32nd St
Lafayette Ave
Villa Way
455
48 24,564
Slurry Seal
$9,826
2023
32nd St
Villa Way
Newport Blvd
530
62 29,150
Slurry Seal
$11,660
2023
Avocado Ave
Coast Highway East
Farralon Or
1,865
64 120,360
Slurry Seal
$48,144
2023
Avocado Ave
Farralon Dr
San Miguel Or
872
66 57,552
Slurry Seal
$23,021
2023
Balboa Blvd E WB
Washington St
Palm St
264
30 7,920
Slurry Seal
$3,168
2023
Dover Dr NB
Westcliff Or
Mariners Dr
2,535
37 96,795
Slurry Seal
$38,718
2023
Dover Or NB
Mariners Or
Irvine Ave
942
1 37
34,854
Slurry Seal
$13,942
2023
Ford Rd EB
San Miguel Dr
Hillside Dr
410
36 14,760
Slurry Seal
$5,904
2023
Ford Rd WB
Hillside Or
San Miguel Or
405
32 12,960
Slurry Seal
$5,184
2023
Marguerite Ave
Harbor View Or
Fifth Ave
1,542
55 84,810
Slurry Seal
$33,924
2023
Marguerite Ave
Harbor View Dr
Sausalito Dr
1,047
60 62,820
Slurry Seal
$25,128
2023
Marguerite Ave
Sausalito Dr
San Joaquin Hills Rd
1,845
60 110,700
Slurry Seal
$44,280
2023
Mesa Or
Irvine Ave
Acacia St
1,365
66 90,090
Slurry Seal
$36,036
2023
Mesa Dr
Acacia St
Mesa Dr/ Birch St
200
66 13,200
Slurry Seal
$5,280
2023
Newport Blvd NB
30th St
32nd St
508
1 35
17,780
Slurry Seal
$7,112
2023
Placentia Ave
Hospital Rd
Superior Ave
810
40 32,400
Slurry Seal
$12,960
2023
Balboa Blvd NB
32nd St
34th St
488
34 1 16,592
Reconstruction
$265,956
2024
Balboa Blvd NB
34th St
36th St
460
34 15,640
Reconstruction
$290,967
2024
Balboa Blvd W EB
22nd St
McFadden PI
445
48 21,360
Reconstruction
$418,006
2024
Balboa Blvd W WB
12th St
14th St
880
24 21,120
Reconstruction
$311,346
2024
Bristol St North
Spruce St
Birch St
1,486
46 72,856
Reconstruction
$977,418
2024
Newport Center Dr SB
Newport Center Dr West
Farallon Dr/Granville Or
945
36 37,020
Mill and Overlay
$233,100
2024
San Miguel Or 5B
Ford Rd
Spyglass Hill Rd/Eastgate Or
2,230
29 67,170
Reconstruction
$1,314,489
2024
Superior Av NB
Ticonderga St
Placentia Ave
1,493
38 56,734
Mill and Overlay
$351,326
2024
Superior Av SB
Placentia Av
Ticonderga St
1,552
38 58,976
Reconstruction
$935,468
2024
Bristol St South
Irvine Ave
Birch St
600
58 33,900
Mill and Overlay
$210,275
2024
San Miguel Or SB
Spyglass Hill Rd/Eastgate Or
Yacht Coquette (North Side)
1,494
29 43,326
Reconstruction
$847,872
2024
San Miguel Dr SB
Yacht Coquette (North Side)
Port Sutton Dr/Yacht Coquette (S)
1,110
29 33,940
Reconstruction
$496,841
2024
San Miguel Or
Avocado Ave
MacArthur Blvd
310
92 28,520
Mill and Overlay
$182,548
2024
Bayside Or
Jamboree Rd
Coast Highway East
4,130
60 247,800
Slurry Seal
$102,094
2024
Jamboree Rd
Bayside Or
Coast Highway East
800
60 48,000
Slurry Seal
$19,776
2024
Balboa Blvd SB
41st St
38th St
670
24 17,330
Mill and Overlay
$112,614
2025
Balboa Blvd SB
36th St
34th St
468
24 11,982
Mill and Overlay
$76,590
2025
MacArthur Blvd SB
Newport Place Or
Jamboree Rd
1,844
61 104,984
Mill and Overlay
$681,876
2025
Newport Blvd SB
23rd St
21st St/Balboa Blvd West
631
32 20,192
Mill and Overlay
$128,833
2025
Newport Center Dr NB
Coast Highway East
Farallon Dr/Granville Or
1,189
36 46,304
Mill and Overlay
$295,389
2025
San Miguel Or NB
Spyglass Hill Rd/Eastgate Or
Ford Rd
2,286
29 70,294
Reconstruction
$1,416,893
2025
Von Karman Ave
Campus Or
Birch St
777
76 56,952
Mill and Overlay
$369,423
2025
Bison Ave EB
Jamboree Rd
MacArthur Blvd
2,310
34 93,040
Slurry Seal
$39,483
2025
Bison Ave EB
MacArthur Blvd
City limit
1,070
42 46,940
Slurry Seal
$19,920
2025
Bison Ave WB
lCity Limit
MacArthur Blvd
1 1,070
1 42
48,340
1 Slurry Seal
$20,514
2025
Bonita Canyon Dr EB
I MacArthur Blvd
lBridge
791
41 32,431
Slurry Seal
$13,763
2025
Bonita Canyon Or EB
113ridge
I Mesa View Or
1,000
30 35,000
Slurry Seal
$14,853
2025
Bonita Canyon Dr EB
Mesa View Dr
Prarie Rd
1,565
30 49,950
Slurry Seal
$21,197
2025
6-52
Appendix A - MPAH

Page 3 of 7 ends

Appendix A AVEM„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Bonita Canyon Dr EB
Prarie Rd
Bridge
820
42 34,440
Slurry Seal
$14,615
2025
Bonita Canyon Dr EB
Bridge
Chambord
420
42 19,140
Slurry Seal
$8,122
2025
Bonita Canyon Dr EB
Chambord
SR-73
1,055
42 44,310
Slurry Seal
$18,804
2025
Bonita Canyon Dr WB
SR-73
Chambord
1,055
44 46,420
Slurry Seal
$19,699
2025
Bonita Canyon Dr WB
Chambord
Bridge
400
1 33
13,200
Slurry Seal
$5,602
2025
Bonita Canyon Dr WB
Bridge
Prarie Rd
835
33 32,555
Slurry Seal
$13,815
2025
Bonita Canyon Dr WB
Prarie Rd
Mesa View Dr
1,565
30 52,950
Slurry Seal
$22,470
2025
Bonita Canyon Dr WB
Mesa View Dr
Bridge
1,000
30 30,000
Slurry Seal
$12,731
2025
Bonita Canyon Dr WB
Bridge
MacArthur Blvd
791
38 39,758
Slurry Seal
$16,872
2025
Ford Rd EB
Jamboree Rd
MacArthur Blvd
3,760
34 129,320
Slurry Seal
$54,879
2025
Ford Rd WB
MacArthur Blvd
Jamboree Rd
3,760
34 1 127,840
Slurry Seal
$54,251
2025
MacArthur Blvd NB
Bonita Canyon Dr/Ford Rd
Villaggio
1,616
59 97,144
Slurry Seal
$41,224
2025
MacArthur Blvd NB
Villaggio
Bison Ave
1,292
55 84,560
Slurry Seal
$35,884
2025
MacArthur Blvd NB
Bison Ave
City Limit
1,145
46 54,470
Slurry Seal
$23,115
2025
MacArthur Blvd SB
City Limit
Bison Ave
1,145
60 75,450
Slurry Seal
$32,018
2025
MacArthur Blvd SB
Bison Ave
Vilaggio
1,292
55 74,060
Slurry Seal
$31,428
2025
MacArthur Blvd SB
Villaggio
Bonita Canyon Dr
1,616
55 101,380
Slurry Seal
$43,022
2025
San Joaquin Hills Rd EB
Jamboree Rd
Santa Cruz Dr
1,510
40 61,900
Slurry Seal
$26,268
2025
San Joaquin Hills Rd EB
Santa Cruz Or
Santa Rosa Dr
2,185
40 88,650
Slurry Seal
$37,620
2025
San Joaquin Hills Rd EB
Santa Rosa Or
MacArthur Blvd
1,530
40 68,200
Slurry Seal
$28,942
2025
San Joaquin Hills Rd WB
MacArthur Blvd
Santa Rosa Dr
1,534
40 70,360
Slurry Seal
$29,858
2025
San Joaquin Hills Rd WB
Santa Rosa Dr
Santa Cruz Dr
2,180
40 92,200
Slurry Seal
$39,126
2025
San Joaquin Hills Rd WB
Santa Cruz Dr
Jamboree Rd
1,531
40 63,240
Slurry Seal
$26,837
2025
University Dr EB
Jamboree Rd
La Vida/Baypointe Dr
640
32 21,730
Slurry Seal
$9,221
2025
University Or EB
La Vida/Baypointe Dr
Bonita Creek Bridge
665
32 21,280
Slurry Seal
$9,030
2025
University Or EB
Bonita Creek Bridge
City Limit
780
44 34,320
Slurry Seal
$14,564
2025
University Dr WB
City Limit
Bonita Creek Bridge
780
44 36,320
Slurry Seal
$15,413
2025
University Or WB
Bonita Creek Bridge
La Vida/Baypointe Dr
675
42 29,600
Slurry Seal
$12,561
2025
University Dr WB
La Vida/Baypointe Or
Jamboree Rd
640
1 42
30,130
Slurry Seal
$12,786
2025
32nd St EB
Balboa Blvd
Newport Blvd
690
32 22,080
Reconstruction
$419,880
2025
Birch St
Von Karman Ave
MacArthur Blvd
1,160
56 74,960
Mill and Overlay
$486,233
1 2025
Eastbluff Dr NB
Vista Del Sol
Jamboree Rd/University Dr
4,000
30 120,000
Reconstruction
$843,469
2025
Eastbluff Or SB
Vista Del Sol
Jamboree Rd
3,975
30 119,250
Reconstruction
$861,916
2025
Santa Rosa Or
Newport Center Dr East
San Joaquin Hills Rd
550
72 39,600
Slurry Seal
$16,805
2025
Balboa Blvd SB
44th St
41st St
630
24 15,870
Mill and Overlay
$106,204
2026
Balboa Blvd SB
29th St
27th St
510
35 17,850
Mill and Overlay
$119,454
2026
Bristol St North
Jamboree Rd
Dove St
566
1 46
26,036
Mill and Overlay
$171,332
2026
Newport Center Dr W NB
Newport Center Dr
Santa Barbara Dr
1,418
36 53,548
Mill and Overlay
$357,645
2026
Newport Center Dr W NB
Santa Barbara Dr
Santa Cruz Dr
1,087
36 41,632
Mill and Overlay
$273,507
2026
Von Karman Ave
Birch St
MacArthur Blvd
2,180
76 163,580
Mill and Overlay
$1,092,725
2026
San Joaquin Hills Rd EB
San Miguel Dr
Crown Dr
932
41 39,212
Mill and Overlay
$257,995
2026
16th St
City Limit
Sea Gull Ln
1,465
60 89,380
Mill and Overlay
$597,162
2026
San Miguel Dr
Newport Center Dr East
Avocado Ave
928
72 1 68,216
Reconstruction
$1,055,687
2026
Balboa Blvd E WB
Adams St
Coronado Ave
630
28 17,640
Mill and Overlay
$115,927
2026
Balboa Blvd E WB
Coronado St
Medina Way
330
28 9,240
Mill and Overlay
$60,724
2026
Santa Cruz Or
San Joaquin Hills Rd
Newport Center Dr West
1,148
72 82,656
Reconstruction
$1,503,813
2026
Spyglass Hill Rd
lHarbor Ridge Dr
Ridgeline Dr
1,283
44 56,452
Mill and Overlay
$371,116
2026
Spyglass Hill Rd
Ridgeline Dr
lEl Capitan Dr
1,276
44 56,144
Reconstruction
$1,165,627
2026
Balboa Blvd SB
132nd St
129th St
705
35 24,675
Mill and Overlay
$167,303
2027
Bristol St North
I Birch St
ICampus Or
617
51 36,967
Mill and Overlay
$254,725
2027
6-53
Appendix A - MPAH

Page 4 of 7 ends

Appendix A AVEE„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
MacArthur Blvd NB
Jamboree Rd
Von Karman Ave
1,763
39 99,757
Mill and Overlay
$675,590
2027
San Miguel Dr NB
San Joaquin Hills Rd
Pacific View Dr
635
29 19,665
Mill and Overlay
$133,178
2027
San Joaquin Hills Rd EB
Crown Dr
Marguerite Ave
1,573
41 65,993
Mill and Overlay
$446,928
2027
Coast Highway E NB
Newport Coast Dr
Cameo Highlands Or
3,705
50 176,750
Slurry Seal
$79,574
2027
Coast Highway E NB
Cameo Highlands Dr
Morning Canyon Rd
1,300
28 1 38,900
Slurry Seal
$17,513
2027
Coast Highway E NB
Morning Canyon Rd
Poppy Ave
1,615
28 48,220
Slurry Seal
$21,709
2027
Coast Highway E NB
Poppy Ave
Marguerite Ave
1,480
28 46,940
Slurry Seal
$21,133
2027
Coast Highway E NB
Marguerite Ave
Goldenrod Ave
1,790
28 54,370
Slurry Seal
$24,478
2027
Coast Highway E NB
Goldenrod Ave
MacArthur Blvd
1,089
28 35,057
Slurry Seal
$15,783
2027
Coast Highway E SB
MacArthur Blvd
Goldenrod Ave
1,089
28 35,442
Slurry Seal
$15,956
2027
Coast Highway E SB
Goldenrod Ave
Marguerite Ave
1,790
28 58,170
Slurry Seal
$26,189
2027
Coast Highway E SB
Marguerite Ave
Poppy Ave
1,480
28 47,190
Slurry Seal
$21,245
2027
Coast Highway E SB
Poppy Ave
Morning Canyon Rd
1,615
28 49,220
Slurry Seal
$22,159
2027
Coast Highway E SB
Morning Canyon Rd
Cameo Highlands Dr
1,300
30 41,750
Slurry Seal
$18,796
2027
Coast Highway E SB
Cameo Highlands Dr
Newport Coast Or
3,705
50 176,850
Slurry Seal
$79,619
2027
Eastbluff Dr SB
Jamboree Rd/University Dr
Vista Del Sol
4,000
30 120,000
Reconstruction
$2,566,106
2027
16th St
Sea Gull Ln
Dover Dr
450
38 17,100
Slurry Seal
$7,699
2027
Marguerite Ave
Fifth Ave
Coast Hwy East
1,082
36 64,920
Slurry Seal
$29,227
2027
Balboa Blvd SB
38th St
36th St
460
1 24
11,040
Mill and Overlay
$78,393
2028
Coast Highway E SB
Avocado Ave
MacArthur Blvd
725
50 41,250
Mill and Overlay
$292,477
2028
Newport Coast Dr NB
Provence
Pelican Hill Rd N/Ocean Ridge Dr
4,853
41 200,473
Mill and Overlay
$1,399,336
2028
San Joaquin Hills Rd WB
Newport Coast Dr
Newport Ridge Dr East
1,030
33 42,890
Mill and Overlay
$299,380
2028
Balboa Blvd NB
44th St
Coast Highway
820
35 28,700
Slurry Seal
$13,309
2028
Balboa Blvd E EB
Island Ave
Medina Way
515
44 21,910
Slurry Seal
$10,160
2028
Balboa Blvd E WB
Medina Way
Island Ave
520
40 1 20,800
Slurry Seal
$9,645
2028
Balboa Blvd W EB
16th St
14th St
951
24 22,824
Slurry Seal
$10,584
2028
Balboa Blvd W EB
12th St
8th St
1,800
50 89,000
Slurry Seal
$41,271
2028
Balboa Blvd W EB
8th St
6th St
893
42 36,506
Slurry Seal
$16,928
2028
Balboa Blvd W EB
6th St
Island Ave
450
42 18,400
Slurry Seal
$8,532
2028
Balboa Blvd W WB
Island Ave
6th St
390
40 15,100
Slurry Seal
$7,002
2028
Balboa Blvd W WB
6th St
8th St
895
40 34,800
Slurry Seal
$16,137
2028
Balboa Blvd W WB
8th St
12th St
1,790
40 70,600
Slurry Seal
$32,738
2028
Balboa Blvd W WB
14th St
16th St
951
24 22,824
Slurry Seal
$10,584
2028
Bristol St South
Spruce Ave
Bayview PI
807
50 42,750
Slurry Seal
$19,824
2028
Campus Dr EB
Bristol St North
Quail St
950
41 40,450
Slurry Seal
$18,757
2028
Campus Dr EB
Quail St
Dove St
1,325
42 58,150
Slurry Seal
$26,965
2028
Campus Or EB
Dove St
Airport
1,850
42 81,300
Slurry Seal
$37,700
2028
Campus Or EB
Airport
MacArthur Blvd
420
62 26,040
Slurry Seal
$12,075
2028
Campus Or EB
MacArthur Ct
Von Karman Ave
1,029
36 1 37,044
Slurry Seal
$17,178
2028
Campus Or EB
Teller Ave
Jamboree Rd
700
33 26,600
Slurry Seal
$12,335
2028
Dover Dr NB
Coast Highway
Cliff Dr
957
39 40,823
Slurry Seal
$18,930
2028
Dover Dr NB
Cliff Dr
Castaways Ln
1,236
30 39,080
Slurry Seal
$18,122
2028
Dover Dr NB
Castaways Ln
Westcliff Dr
1,270
30 44,100
Slurry Seal
$20,450
2028
Dover Dr SB
Westcliff Dr
16th St
1,290
33 44,070
Slurry Seal
$20,436
2028
Dover Dr SB
16th St
Cliff Or
1,250
1 30
37,500
Slurry Seal
$17,389
2028
Dover Dr SB
Cliff Dr
Coast Highway
989
41 52,549
Slurry Seal
$24,368
2028
Irvine Ave
16th St
Mariners Dr
2,600
34 88,400
Slurry Seal
$40,992
2028
Irvine Ave
Mariners Or
Dover Dr
1,213
32 38,816
Slurry Seal
$18,000
2028
Irvine Ave
Dover Dr
Linda Ln
645
34 21,930
Slurry Seal
$10,169
2028
Irvine Ave
I Linda Ln
I Baycrest Rd
1,085
34 36,890
Slurry Seal
$17,106
2028
6-54
Appendix A - MPAH

Page 5 of 7 ends

Appendix A AVEE„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Irvine Ave
Santiago Dr
23rd St
1,573
77 103,606
Slurry Seal
$48,043
2028
Irvine Ave
23rd St
Santa Isabel Ave
1,500
76 114,000
Slurry Seal
$52,863
2028
Irvine Ave
Santa Isabel Ave
University Dr
2,630
28 96,800
Slurry Seal
$44,887
2028
Irvine Ave
Mesa Dr
Bristol St South
3,140
42 129,900
Slurry Seal
$60,236
2028
Irvine Ave
Baycrest Rd
Francisco Dr
1,227
1 38
46,626
Slurry Seal
$21,621
2028
Irvine Ave
Francisco Dr
Santiago Dr
991
38 37,658
Slurry Seal
$17,463
2028
Irvine Ave
Santiago Dr
Francisco Dr
996
38 37,848
Slurry Seal
$17,551
2028
Irvine Ave
Francisco Dr
Baycrest Rd
1,223
38 46,474
Slurry Seal
$21,551
2028
Irvine Ave
300' S of Monte Vista Ave
Santa Isabel Ave
1,049
28 29,372
Slurry Seal
$13,620
2028
Irvine Ave

BRISTOL ST

MESA DR
3,140
42 131,880
Slurry Seal
$61,155
2028
Irvine Ave
Baycrest Rd
Santiago Dr
2,170
38 1 82,460
Slurry Seal
$38,238
2028
Jamboree Rd NB
Coast Highway East
Back Bay Dr
990
53 37,014
Slurry Seal
$17,164
2028
Jamboree Rd NB
Back Bay Dr
Island Lagoon Dr/Hyatt Newporter
675
61 42,175
Slurry Seal
$19,557
2028
Jamboree Rd NB
Island Lagoon Dr/Hyatt Newporter
Santa Barbara Dr
3,100
46 155,600
Slurry Seal
$72,154
2028
Jamboree Rd NB
Santa Barbara Dr
San Joaquin Hills Rd
945
47 46,415
Slurry Seal
$21,523
2028
Jamboree Rd NB
San Joaquin Hills Rd
Ford Rd
2,608
46 127,968
Slurry Seal
$59,340
2028
Jamboree Rd NB
Ford Rd
Bison Ave
3,244
46 152,424
Slurry Seal
$70,681
2028
Jamboree Rd NB
Bison Ave
University Dr/Eastbluff Dr
3,080
46 144,680
Slurry Seal
$67,090
2028
Jamboree Rd NB
University Dr/Eastbluff Dr
Bayview Way
1,735
57 83,439
Slurry Seal
$38,692
2028
Jamboree Rd SB
Fairchild Rd
Koll Center
699
58 42,542
Slurry Seal
$19,727
2028
Jamboree Rd SB
University Dr/Eastbluff Dr
Bison Ave
3,030
46 151,880
Slurry Seal
$70,429
2028
Jamboree Rd SB
Bison Ave
Ford Rd/Eastbluff Dr
3,205
46 154,430
Slurry Seal
$71,611
2028
Jamboree Rd SB
Ford Rd/Eastbluff Dr
San Joaquin Hills Rd
2,625
46 128,450
Slurry Seal
$59,564
2028
Jamboree Rd SB
San Joaquin Hills Rd
Santa Barbara Dr
920
1 46
51,920
Slurry Seal
$24,076
2028
Jamboree Rd SB
Santa Barbara Dr
Island Lagoon Dr/Hyatt Newporter
3,135
46 1 146,710
Slurry Seal
$68,031
2028
Jamboree Rd SB
Island Lagoon Dr/Hyatt Newporter
Back Bay Dr
635
46 31,460
Slurry Seal
$14,588
2028
Jamboree Rd SB
Back Bay Dr
Coast Highway East
1,030
45 53,350
Slurry Seal
$24,739
2028
MacArthur Blvd NB
Coast Highway East
San Miguel Dr
2,843
34 105,712
Slurry Seal
$49,020
2028
MacArthur Blvd NB
San Miguel Dr
San Joaquin Hills Rd
1,463
46 74,798
Slurry Seal
$34,685
2028
MacArthur Blvd NB
San Joaqin Hills Rd
3400' N of San Joaqin Hills Rd
3,400
44 151,350
Slurry Seal
$70,183
2028
MacArthur Blvd NB
3400' N of San Joaqin Hills Rd
Bonita Canyon Dr/Ford Rd
2,600
44 140,900
Slurry Seal
$65,337
2028
MacArthur Blvd SB
Bonita Canyon Dr
2600' S Bonita Canyon Dr
2,600
46 125,600
Slurry Seal
$58,242
2028
MacArthur Blvd SB
2600' S Bonita Canyon Dr
San Joaqin Hills Rd
3,400
46 171,400
Slurry Seal
$79,480
2028
MacArthur Blvd SB
San Joaquin Hills Rd
San Miguel Dr
1,533
44 74,952
Slurry Seal
$34,756
2028
MacArthur Blvd SB
San Miguel Dr
Coast Highway East
2,809
34 125,006
Slurry Seal
$57,967
2028
Newport Blvd NB
32nd St
Finley Ave
420
52 20,880
Slurry Seal
$9,682
2028
Newport Blvd NB
Finley Ave
Via Lido
502
42 21,084
Slurry Seal
$9,777
2028
Newport Blvd SB
Finley Ave
32nd St
460
42 21,820
Slurry Seal
$10,118
2028
Newport Blvd SB
32nd St
30th St
504
35 17,640
Slurry Seal
$8,180
2028
Newport Blvd SB
26th St
23rd St
540
1 32
17,280
Slurry Seal
$8,013
2028
Newport Blvd SB
Via Lido
Finley Ave
513
42 21,546
Slurry Seal
$9,991
2028
Newport Center Dr E SB
Santa Cruz Dr
Santa Rosa Dr
1,403
36 53,008
Slurry Seal
$24,581
2028
Newport Coast Dr SB
Provence
Pelican Hill Rd South
1,581
41 70,821
Slurry Seal
$32,841
2028
Newport Coast Dr SB
Pelican Hill Rd South
Coast Highway East
1,849
41 83,809
Slurry Seal
$38,863
2028
San Joaquin Hills Rd EB
MacArthur Blvd
San Miguel Dr
983
40 44,320
Slurry Seal
$20,552
2028
San Joaquin Hills Rd EB
Marguerite Ave
Spyglass Hill Rd
2,801
41 116,841
Slurry Seal
$54,181
2028
San Joaquin Hills Rd EB
Newport Ridge Dr East
Newport Coast Dr
1 1,050
1 33
1 41,125
Slurry Seal
$19,070
2028
San Joaquin Hills Rd WB
Spyglass Hill Rd
1 Marguerite Ave
2,759
41 115,619
Slurry Seal
$53,614
2028
San Joaquin Hills Rd WB
San Miguel Dr
I MacArthur Blvd
965
41 41,565
Slurry Seal
$19,274
2028
San Miguel Dr NB
MacArthur Blvd
ISan Joaquin Hills Rd
1,285
31 45,335
Slurry Seal
$21,022
2028
6-55
Appendix A - MPAH

Page 6 of 7 ends

Appendix A '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level

PAVEMENT

ENGINEERING
MPAH
Street Name
Limits of Work
Length of
Segment
Width of
Segment
Pavement Area (SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
San Miguel Dr SB
Harbor Woods PI
Pacific View Dr
505
29 15,645
Slurry Seal
$7,255
2028
San Miguel Or SB
San Joaquin Hills Rd
MacArthur Blvd
1,240
30 41,200
Slurry Seal
$19,105
2028
Superior Av NB
Placentia Ave
City Limit
1,750
38 66,500
Slurry Seal
$30,837
2028
Westcliff Or EB
Irvine Ave
Dover Dr
1,703
25 42,575
Slurry Seal
$19,743
2028
Westcliff Or WB
Dover Dr
Irvine Ave
1,695
1 25
42,375
Slurry Seal
$19,650
2028
Hospital Rd
Placentia Ave
Newport Blvd
700
57 39,900
Mill and Overlay
$282,813
2028
Balboa Blvd E WB
Palm St
Adams St
250
22 5,500
Mill and Overlay
$38,984
2028
32nd St
Lafayette Ave
Villa Way
455
48 24,564
Slurry Seal
$11,391
2028
32nd St
Villa Way
Newport Blvd
530
62 29,150
Slurry Seal
$13,517
2028
Avocado Ave
Coast Highway East
Farralon Dr
1,865
64 120,360
Slurry Seal
$55,813
2028
Balboa Blvd E WB
Washington St
Palm St
264
30 7,920
Slurry Seal
$3,673
2028
Dover Dr NB
Westcliff Or
Mariners Dr
2,535
37 96,795
Slurry Seal
$44,885
2028
Dover Dr NB
Mariners Or
Irvine Ave
942
37 34,854
Slurry Seal
$16,162
2028
Ford Rd EB
San Miguel Dr
Hillside Dr
410
36 14,760
Slurry Seal
$6,844
2028
Ford Rd WB
Hillside Dr
San Miguel Dr
405
32 12,960
Slurry Seal
$6,010
2028
Marguerite Ave
Harbor View Or
Fifth Ave
1,542
55 1 84,810
Slurry Seal
$39,328
2028
Marguerite Ave
Harbor View Dr
Sausalito Dr
1,047
60 62,820
Slurry Seal
$29,130
2028
Marguerite Ave
Sausalito Or
San Joaquin Hills Rd
1,845
60 110,700
Slurry Seal
$51,333
2028
Mesa Dr
Acacia St
Mesa Dr/ Birch St
200
66 13,200
Slurry Seal
$6,121
2028
Newport Blvd NB
30th St
32nd St
508
35 17,780
Slurry Seal
$8,245
2028
Balboa Blvd NB
23rd St
25th St
400
35 11,600
Mill and Overlay
$84,840
2029
Balboa Blvd NB
25th St
27th St
360
35 12,600
Mill and Overlay
$90,649
2029
Bristol St North
Dove St
Spruce St
1,261
1 46
58,006
Mill and Overlay
$424,038
2029
Jamboree Rd SB
Campus Dr
Birch St
840
49 43,740
Mill and Overlay
$319,436
2029
MacArthur Blvd NB
Von Karman Ave
Birch St
2,449
60 146,940
Mill and Overlay
$1,056,611
2029
MacArthur Blvd SB
Campus Dr
Birch St
860
61 81,960
Mill and Overlay
$589,355
2029
MacArthur Blvd SB
Birch St
Newport Place Dr
2,454
60 147,240
Mill and Overlay
$1,076,359
2029
Balboa Blvd W EB
123rd St
22nd St
300
29 8,700
1 Mill and Overlay
1 $63,516
1 2029
Bristol St South
I Bayview PI
Jamboree Rd
1,000
50 52,000
Mill and Overlay
$380,132
2029
Bayside Dr
J.Jamboree Rd
lCoast Highway East
4,130
60 247,800
Slurry Seal
$118,355
2029
Jamboree Rd
Bayside Dr
Coast Highway East
800
60 48,000
Slurry Seal
$22,926
2029
6-56
Appendix A - MPAH

Page 7 of 7 ends

Appendix A 4000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
42nd St
River Ave
Balboa Blvd
158
20 3160
Reconstruction
$3,716
2023
Seaview Ave
Marguerite Ave
Narcissus Ave
615
30 18450
Reconstruction
$103,320
2023
26th St
East End
Newport Blvd
140
29 4060
Slurry Seal
$1,421
2023
28th St
Newport Blvd West SB
Balboa Blvd
220
60 13200
Slurry Seal
$4,620
2023
54th St
Neptune Ave
Seashore Dr
75 27
2025
1 Slurry Seal
$709
2023
60th St
North End
Coast Highway West
155
28 4340
Slurry Seal
$1,519
2023
Acacia Ave
Coast Highway East
Second Ave
1,075
27 29025
Slurry Seal
$10,159
2023
Acacia Ave
Second Ave
Pacific Dr
717
27 19359
Slurry Seal
$6,776
2023
Aldebaran Cir
Galaxy Dr
End
135
55 9925
Slurry Seal
$3,474
2023
Anita Ln
Estelle Ln
Marian Ln
1,102
33 36366
Slurry Seal
$12,728
2023
Antigua Cir
Santiago Dr
End
165
33 7945
Slurry Seal
$2,781
2023
Antigua Way
Santiago Dr (North End)
Mariners Dr
1,980
37 74460
Slurry Seal
$26,061
2023
Antigua Way
Mariners Dr
Santiago Dr (South End)
1,006
35 35210
Slurry Seal
$12,324
2023
Ashford Ln
Glenwood Ln
Santiago Dr
315
33 10995
Slurry Seal
$3,848
2023
Avocado Ave
Pacific Dr
160' N of Pacific Dr
160
16 2560
Slurry Seal
$896
2023
Back Bay Dr
Shellmaker Rd
Beginning of PCC Section
800
22 17600
Slurry Seal
$6,160
2023
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
1,649
22 36278
Slurry Seal
$12,697
2023
Back Bay Dr
End of PCC Section
Backbay sewer pump station
3,106
22 68332
Slurry Seal
$23,916
2023
Back Bay Dr
Access Rd
Staired Path to Landmark
2,394
22 52668
Slurry Seal
$18,434
2023
Baycrest Rd
Irvine Ave
Tradewinds Ln
238
38 9044
Slurry Seal
$3,165
2023
Bayport Way
Holiday Rd
South End
232
33 7656
Slurry Seal
$2,680
2023
Bayport Way
Francisco Dr
North End
213
34 9742
Slurry Seal
$3,410
2023
Bayside Dr
Marguerite Ave
Carnation Ave
2,415
37 74855
Slurry Seal
$26,199
2023
Bayside Dr
Coast Highway East
End
1,187
38 45106
Slurry Seal
$15,787
2023
Bayview Dr
Ocean Blvd
Goldenrod Ave
157
28 4396
Slurry Seal
$1,539
2023
Bayview Dr
Goldenrod Ave
Heliotrope Ave
251
28 7028
Slurry Seal
$2,460
2023
Bayview Dr
Heliotrope Ave
Iris Ave
260
28 7280
Slurry Seal
$2,548
2023
Beacon Bay
Harbor Island Rd
End
1,170
24 28080
Slurry Seal
$9,828
2023
Beacon St
Westminster Ave
Holmwood Dr
240
34 8160
Slurry Seal
$2,856
2023
Beacon St
La Jolla Dr
Santa Ana Ave
105
33 3465
1 Slurry Seal
$1,213
2023
Bedford Ln
Rutland Rd
Buckingham Ln
641
36 23076
Slurry Seal
$8,077
2023
Begonia Ave
Pacific Dr
Coast Highway East
1,885
28 52780
Slurry Seal
$18,473
2023
Berkshire Ln
Oxford Ln
Cambridge Ln
947
34 32198
Slurry Seal
$11,269
2023
Birch St
Mesa Dr
End
232
36 9552
Slurry Seal
$3,343
2023
Bonaire Way
Holiday Rd
South End
235
33 10255
Slurry Seal
$3,589
2023
Bonaire Way
Francisco Dr
North End
225
33 7425
Slurry Seal
$2,599
2023
Braemar Way
Francisco Dr
End
215
34 9810
Slurry Seal
$3,434
2023
Breakers Dr
Breakers Dr
End
1,035
25 25875
Slurry Seal
$9,056
2023
Brighton Rd
Cameo Shores Rd
Camden Dr
1,390
33 48370
Slurry Seal
$16,930
2023
Buck Gully Dr
Sandcastle Dr
End
126
36 5786
Slurry Seal
$2,025
2023
Buckingham Ln
Westcliff Dr
Cornwall Ln
620
36 22320
Slurry Seal
$7,812
2023
Buttonshell Ln
Holiday Rd
Nautilus Ln
410
33 14130
Slurry Seal
$4,946
2023
Cambria Dr
El Capitan Dr
Drakes Bay Dr
2,510
32 80320
Slurry Seal
$28,112
2023
Cambridge Ln
Devon Ln
Highland Dr
803
34 27902
1 Slurry Seal
$9,766
2023
Camden Dr
Cameo Shores Rd
Milford Dr
1,345
33 44385
Slurry Seal
$15,535
2023
Cameo Shores Rd
Coast Highway East
Orrington Rd
1,088
37 37777
Slurry Seal
$13,222
2023
Cameo Shores Rd
Orrington Rd
Brighton Rd
956
37 35372
Slurry Seal
$12,380
2023
Candlestick Ln
lGlenwood Ln
ISandalwood Ln
630
35 23250
Slurry Seal
$8,138
2023
Castaways Ln
I Dover Dr
ICastaways (private) North
462
1 54
24948
Slurry Seal
$8,732
2023
6-57
Appendix A - Local Streets

Page 1 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Centella PI
Holiday Rd
South End
369
33 12177
Slurry Seal
$4,262
2023
Centella PI
Santiago Dr
North End
265
37 12305
Slurry Seal
$4,307
2023
Commodore Rd
Tradewinds Ln
Mariners Dr
1,950
38 75300
Slurry Seal
$26,355
2023
Constellation Dr
Santiago Dr
End
135
38 5130
Slurry Seal
$1,796
2023
Cornwall Ln
Pembroke Ln
Dover Dr
712
34 24808
Slurry Seal
$8,683
2023
Court Ave
20th St
McFadden PI
85 28
2380
1 Slurry Seal
$833
2023
Crown Dr North
Crown Dr
San Joaquin Hills Rd
1,370
36 49320
Slurry Seal
$17,262
2023
Cumberland Ln
Sussex Ln
Dover Dr
435
34 15390
Slurry Seal
$5,387
2023
Cutter Rd
Beacon Bay
End
380
24 9120
Slurry Seal
$3,192
2023
Dahlia Ave
Ocean Blvd
Seaview Ave
275
27 7425
Slurry Seal
$2,599
2023
Dahlia Ave
200' S of First St
Coast Highway East
1,490
27 40230
Slurry Seal
$14,081
2023
Deborah Ln
Mariners Dr
Vivian Ln
243
34 8262
Slurry Seal
$2,892
2023
Deborah Ln
Vivian Ln
Sylvia Ln
633
34 22122
Slurry Seal
$7,743
2023
Diana Ln
Priscilla Ln
Vivian Ln
762
34 27108
1 Slurry Seal
$9,488
2023
Donnie Rd
22nd St
End
540
33 20320
Slurry Seal
$7,112
2023
Doris Ln
Dover Dr
Ruth Ln
241
36 8676
Slurry Seal
$3,037
2023
Dorothy Ln
Mariners Dr
Estelle Ln
238
33 7854
Slurry Seal
$2,749
2023
Dorothy Ln
Estelle Ln
Marian Ln
920
34 31280
Slurry Seal
$10,948
2023
Dover Dr
End
Leila Ln
492
29 15768
Slurry Seal
$5,519
2023
Dover Dr
Leila Ln
Mariners Dr
500
29 14500
Slurry Seal
$5,075
2023
Dover Dr
Mariners Dr
Doris Ln
510
29 14790
Slurry Seal
$5,177
2023
Dover Dr
Doris Ln
Nottingham Rd
590
29 17110
Slurry Seal
$5,989
2023
Dover Dr
Nottingham Rd
Norfolk Ln
665
29 19285
Slurry Seal
$6,750
2023
Dover Dr
Norfolk Ln
Westcliff Dr
490
29 14210
Slurry Seal
$4,974
2023
Dover Dr
Westcliff Dr
Dover Dr (Arterial)
170
36 5460
Slurry Seal
$1,911
2023
Essex Ln
Cambridge Ln
Oxford Ln
836
34 28424
Slurry Seal
$9,948
2023
Estelle Ln
Ruth Ln
Highland Dr
1,368
33 45744
Slurry Seal
$16,011
2023
Eton PI
Dover Dr
End
163
33 7879
Slurry Seal
$2,758
2023
Evening Star Ln
Polaris Dr
End
980
33 34840
Slurry Seal
$12,194
2023
Fairfield Dr
Cameo Shores Rd
Milford Dr
1,355
33 44715
Slurry Seal
$15,650
2023
Fernleaf Ave
Seaview Ave
150' N Seaview Ave
150
27 4050
Slurry Seal
$1,418
2023
Fernleaf Ave
250' S of First St
Coast Highway East
1,260
27 34020
Slurry Seal
$11,907
2023
First Ave
Carnation Ave
Dahlia Ave
271
27 7317
Slurry Seal
$2,561
2023
First Ave
Dahlia Ave
Fernleaf Ave
270
27 7290
Slurry Seal
$2,552
2023
First Ave
Fernleaf Ave
Goldenrod Ave
270
27 7290
Slurry Seal
$2,552
2023
First Ave
Goldenrod Ave
Heliotrope Ave
270
27 7290
Slurry Seal
$2,552
2023
First Ave
Iris Ave
Jasmine Ave
270
27 7290
Slurry Seal
$2,552
2023
Ford Rd
Hillside Dr
East End
590
32 22320
Slurry Seal
$7,812
2023
Ford Rd EB
West End
San Miguel Dr
840
30 26900
Slurry Seal
$9,415
2023
Ford Rd WB
Newport Hills Dr
West End
877
29 25433
Slurry Seal
$8,902
2023
Fourth Ave
Avocado Ave
Acacia Ave
265
27 7155
Slurry Seal
$2,504
2023
Fourth Ave
Acacia Ave
Begonia Ave
267
27 7209
Slurry Seal
$2,523
2023
Fourth Ave
Begonia Ave
Carnation Ave
265
27 7155
Slurry Seal
$2,504
2023
Fourth Ave
Carnation Ave
Dahlia Ave
265
27 7155
Slurry Seal
$2,504
2023
Francisco Dr
Tustin Ave
Irvine Ave
1,290
37 47730
Slurry Seal
$16,706
2023
Francisco Dr
Irvine Ave
Tradewinds Ln
236
36 8496
1 Slurry Seal
$2,974
2023
Galatea Ter
Bayadere Ter
Angelita Dr
1,750
33 57750
Slurry Seal
$20,213
2023
Glenwood Ln
lCandlestick Ln
lAshford Ln
640
1 33
22320
Slurry Seal
$7,812
1 2023
Goldenrod Ave
150' S of Seaview Ave
I Seaview Ave
150
1 28
4200
Slurry Seal
$1,470
1 2023
6-58
Appendix A - Local Streets

Page 2 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Goldenrod Ave
End
Coast Highway East
1,124
28 31472
Slurry Seal
$11,015
2023
Gorham Dr
Cameo Shores Rd
Milford Dr
1,400
33 46200
Slurry Seal
$16,170
2023
Hampden Rd
Milford Dr
Cameo Shores Rd
930
37 34410
Slurry Seal
$12,044
2023
Hampden Rd
Cameo Shores Rd
End
213
37 8131
Slurry Seal
$2,846
2023
Hampshire Cir
Antigua Way
Antigua Way
751
34 25534
Slurry Seal
$8,937
2023
Hampshire Ct
Hampshire Cir
End
134
50 9200
1 Slurry Seal
$3,220
2023
Hampshire Ln
Lincoln Ln
Santiago Dr
250
34 8500
Slurry Seal
$2,975
2023
Hampshire Ln
Santiago Dr
Antigua Way
250
34 8500
Slurry Seal
$2,975
2023
Harbor Island Dr
Bayside Dr
Harbor Island Rd
750
43 34250
Slurry Seal
$11,988
2023
Harbor Island Dr
Harbor Island Rd
E End
1,862
37 68894
Slurry Seal
$24,113
2023
Harbor Island Dr
Harbor Island Dr
N End
190
36 6840
Slurry Seal
$2,394
2023
Hazel Dr
Coast Highway East
577' N of Coast Highway East
577
30 17310
Slurry Seal
$6,059
2023
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
393
29 11397
Slurry Seal
$3,989
2023
Heather Ln
Irvine Ave
End
955
34 36390
1 Slurry Seal
$12,737
2023
Heliotrope Ave
Ocean Blvd
Bayview Dr
400
27 10800
Slurry Seal
$3,780
2023
Heliotrope Ave
Seaview Ave
End
314
27 8478
Slurry Seal
$2,967
2023
Heliotrope Ave
Bayside Dr
Coast Highway East
1,015
28 28420
Slurry Seal
$9,947
2023
Highland Dr
Westcliff Dr
Nottingham Rd
1,592
38 60496
Slurry Seal
$21,174
2023
Highland Dr
Nottingham Rd
Mariners Dr
1,858
38 70604
Slurry Seal
$24,712
2023
Highland Dr
Mariners Dr
Irvine Ave
1,945
37 71965
Slurry Seal
$25,188
2023
Holiday Rd
Galaxy Dr
Santiago Dr
165
38 6270
Slurry Seal
$2,195
2023
Holiday Rd
Santiago Dr
Tradewinds Ln
1,485
38 56430
1 Slurry Seal
$19,751
2023
Holiday Rd
Irvine Ave
Tustin Ave
1,290
38 49020
Slurry Seal
$17,157
2023
Hospital Rd
Superior Ave
Placentia Ave
976
44 42944
Slurry Seal
$15,031
2023
Indian Spring Ln
Irvine Ave
End
78 52
6556
Slurry Seal
$2,295
2023
Iris Ave
Ocean Blvd
Seaview Ave
625
28 17500
Slurry Seal
$6,125
2023
Iris Ave
Seaview Ave
North End
320
28 8960
Slurry Seal
$3,136
2023
Island Ave
Bay Ave East
Balboa Blvd West
164
33 5412
Slurry Seal
$1,894
1 2023
Jasmine Ave
88' N of Ocean Blvd
Seaview Ave
432
28 12096
Slurry Seal
$4,234
2023
Jasmine Ave
Seaview Ave
North End
283
27 7641
1 Slurry Seal
$2,674
2023
Jasmine Ave
Bayside Dr
Coast Highway East
480
28 13440
Slurry Seal
$4,704
2023
Kathleen Ln
Teresita Ln
Beryl Ln
255
34 9270
Slurry Seal
$3,245
2023
Kathleen Ln
Beryl Ln
Highland Dr
260
34 8840
Slurry Seal
$3,094
2023
Kent Ln
Sussex Ln
Dover Dr
415
34 14110
Slurry Seal
$4,939
2023
Ketch Rd
Beacon Bay
End
310
24 7440
Slurry Seal
$2,604
2023
Larkspur Ave
Ocean Blvd
Seaview Ave
470
28 13160
Slurry Seal
$4,606
2023
Larkspur Ave
Seaview Ave
North End
360
28 10080
Slurry Seal
$3,528
2023
Larkspur Ave
Bayside Dr
Coast Highway East
247
28 6916
Slurry Seal
$2,421
2023
Leila Lane
Dover Dr (Cul-de-Sac)
Diana Ln
240
33 7920
Slurry Seal
$2,772
2023
Lincoln Ln
Estelle Ln
Marian Ln
1,563
34 53742
Slurry Seal
$18,810
2023
Linda Ln
Irvine Ave
Priscilla Ave
234
34 7956
Slurry Seal
$2,785
2023
Malabar Dr
Seadrift Dr/El Paseo Dr
Bonnie Doone Ter
688
37 25456
Slurry Seal
$8,910
2023
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
721
36 26406
Slurry Seal
$9,242
2023
Marian Ln
Lincoln Ln
Highland Dr
279
38 11202
1 Slurry Seal
$3,921
2023
Marigold Ave
Seaview Ave
Coast Highway East
585
28 16380
Slurry Seal
$5,733
2023
Mariners Dr
Irvine Ave
Dover Dr
1,450
38 55100
Slurry Seal
$19,285
2023
Mariners Dr
Dover Dr
Santiago Dr
2,212
38 84056
Slurry Seal
$29,420
2023
Mariners Dr
ISantiago Dr
I East End
1,232
1 37
48084
Slurry Seal
$16,830
1 2023
Marlin Way
IShipway Ln
ITerrapin Way
725
1 33
25725
Slurry Seal
$9,004
1 2023
6-59
Appendix A - Local Streets

Page 3 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Mesa View North
Ford Rd
Bonita Canyon Dr
400
43 17200
Slurry Seal
$6,020
2023
Milford Dr
Hampden Rd
Orrington Rd
875
37 32375
Slurry Seal
$11,331
2023
Milford Dr
Orrington Rd
Camden Dr
801
37 32137
Slurry Seal
$11,248
2023
Morning Canyon Rd
Coast Highway East
Shorecliff Rd
1,462
27 41964
Slurry Seal
$14,688
2023
Morning Star Ln
Polaris Dr
End
675
33 24775
Slurry Seal
$8,671
2023
Narcissus Ave
Ocean Blvd
Seaview Ave
366
27 9882
Slurry Seal
$3,459
2023
Narcissus Ave
Seaview Ave
Coast Highway East
553
27 14931
Slurry Seal
$5,226
2023
Nautilus Lane
Toyon Ln
Buttonshell Ln
320
33 11760
Slurry Seal
$4,116
2023
Newport Coast Dr SB
73 Freeway Bridge
Sage Hill
2,235
44 98340
Slurry Seal
$34,419
2023
Newport Hills Dr E
Port Ramsgate PI
Port Seabourne Way
1,550
37 57350
Slurry Seal
$20,073
2023
Newport Hills Dr E
Port Sutton Dr
Newport Hills Dr West
1,985
38 75430
Slurry Seal
$26,401
2023
Norfolk Ln
Dover Dr
Devon Ln
220
33 7260
1 Slurry Seal
$2,541
2023
North Star Ln
White Cliffs Dr
End
850
33 30550
Slurry Seal
$10,693
2023
Nottingham Rd
Dover Dr
Santiago Dr
1,758
38 66804
Slurry Seal
$23,382
2023
Orchid Ave
Ocean Blvd
Coast Highway East
1,106
27 29862
Slurry Seal
$10,452
2023
Orrington Rd
Cameo Shores Rd
Milford Dr
1,425
33 47025
Slurry Seal
$16,459
2023
Paloma Dr
Holiday Rd
City Limit
650
35 22750
Slurry Seal
$7,963
2023
Pembroke Ln
Mariners Dr
Cornwall Ln
930
34 32220
Slurry Seal
$11,277
2023
Perham Rd
Cameo Shores Rd
Milford Dr
1,380
33 45540
Slurry Seal
$15,939
2023
Pescador Dr
Nottingham Rd
Santiago Dr
1,487
33 50271
Slurry Seal
$17,595
2023
Piazza Genoa
Via Lido Soud
Via Genoa
192
45 8640
Slurry Seal
$3,024
2023
Piazza Lido
Via Florence
Via Havre
510
58 29580
Slurry Seal
$10,353
2023
Piazza Lido
Via Havre
Via Koron
428
24 10272
Slurry Seal
$3,595
2023
Poinsettia Ave
Ocean Blvd
Seaview Ave
547
28 15316
Slurry Seal
$5,361
2023
Poinsettia Ave
Seaview Ave
Coast Highway East
638
28 17864
Slurry Seal
$6,252
2023
Point Conception Way
El Capitan Dr
Drakes Bay Dr
168
36 6798
Slurry Seal
$2,379
2023
Poppy Ave
190'S Coast Highway East
Coast Highway East
190
21 3990
Slurry Seal
$1,397
2023
Pork Barrel Way (35th 1/2 St)
Finley Ave
S End
80 16
1280
Slurry Seal
$448
2023
Port Abbey PI
Port Sheffield PI (West End)
Newport Hills Drive West
772
32 24704
Slurry Seal
$8,646
2023
Port Albans Cir
Newport Hills Dr East
End
175
54 9450
Slurry Seal
$3,308
2023
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
620
32 19840
Slurry Seal
$6,944
2023
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
958
32 30656
Slurry Seal
$10,730
2023
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
1,461
32 47252
Slurry Seal
$16,538
2023
Port Ramsey PI
San Miguel Dr
Port Whitby PI
153
36 6008
Slurry Seal
$2,103
2023
Port Ramsgate PI
Newport Hills Drive East
Port Chelsea PI (East End)
430
32 13760
Slurry Seal
$4,816
2023
Port Stanhope Cir
Newport Hills Dr West
End
115
38 5330
1 Slurry Seal
$1,866
2023
Port Stirling PI
Port Ashley PI (West Side)
Newport Hills Drive West
615
32 19680
Slurry Seal
$6,888
2023
Port Tiffin Cir
Newport Hills Dr West
End
115
54 6210
Slurry Seal
$2,174
2023
Port Whitby PI
Port Ramsey PI
Port Durness PI
1,020
36 37220
Slurry Seal
$13,027
2023
Prairie Road NB
Ford Rd
Bonita Canyon Dr
350
46 16100
Slurry Seal
$5,635
2023
Prairie Road SB
Bonita Canyon Dr
Ford Rd
350
35 12250
Slurry Seal
$4,288
2023
Priscilla Ln
Beryl Ln
Diana Ln
658
34 23572
Slurry Seal
$8,250
2023
Ruth Ln
Estelle Ln
Marian Ln
631
34 22654
Slurry Seal
$7,929
2023
Rutland Rd
Mariners Dr
Westcliff Dr
1,350
36 48600
1 Slurry Seal
$17,010
2023
Sandalwood Ln
Santiago Dr
Candlestick Ln
402
35 14670
Slurry Seal
$5,135
2023
Santa Isabel Ave
Irvine Ave
Tustin Ave
290
56 16240
Slurry Seal
$5,684
2023
Santiago Dr
Tustin Ave
Irvine Ave
1,275
37 48375
Slurry Seal
$16,931
2023
Santiago Dr
lAntigua Way
lMariners Dr
953
1 36
34308
Slurry Seal
1 $12,008
1 2023
Schooner Rd
I Beacon Bay
I End
290
1 24
6960
Slurry Seal
1 $2,436
1 2023
6-60
Appendix A - Local Streets

Page 4 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Seaview Ave
Narcissus Ave
Orchid Ave
256
28 7040
Slurry Seal
$2,464
2023
Seaview Ave
Orchid Ave
Poinsettia Ave
270
28 7425
Slurry Seal
$2,599
2023
Seaward Rd
Evening Canyon Rd
Driftwood Rd
287
27 7749
Slurry Seal
$2,712
2023
Second Ave
Carnation Ave
Heliotrope Ave
1,200
28 33600
Slurry Seal
$11,760
2023
Shipway Ln
Tradewinds Ln
Skylark Ln
782
38 29716
Slurry Seal
$10,401
2023
Skylark Ln
Highland Dr
Commodore Rd
245
37 9065
1 Slurry Seal
$3,173
2023
Skylark Ln
Commodore Rd
Holiday Rd
1,088
38 41344
Slurry Seal
$14,471
2023
Somerset Ln
Highland Dr
Highland Dr
1,445
34 50330
Slurry Seal
$17,616
2023
Starlight Cir
Commodore Rd
Glenwood Ln
233
35 8155
Slurry Seal
$2,854
2023
Starlight Cir
Glenwood Ln
End
195
33 8935
Slurry Seal
$3,127
2023
Sussex Ln
Dover Dr
Cumberland Ln
1,205
34 41570
Slurry Seal
$14,550
2023
Sylvia Ln
Beryl Ln
Deborah Ln
462
34 16308
Slurry Seal
$5,708
2023
Teresita Ln
Kathleen Ln
Vivian Ln
530
35 19150
Slurry Seal
$6,703
2023
Third Ave
Avocado Ave
Acacia Ave
270
27 7290
Slurry Seal
$2,552
2023
Third Ave
Acacia Ave
Begonia Ave
265
27 7155
Slurry Seal
$2,504
2023
Third Ave
Begonia Ave
Carnation Ave
265
27 7155
Slurry Seal
$2,504
2023
Third Ave
Dahlia Ave
Fernleaf Ave
265
27 7155
Slurry Seal
$2,504
2023
Toyon Ln
Holiday Rd
Nautilus Ln
445
33 15285
Slurry Seal
$5,350
2023
Tradewinds Ln
Santiago Dr
Commodore Rd
2,275
38 86450
Slurry Seal
$30,258
2023
Tremont Ln
Cameo Shores Rd
Milford Dr
1,420
33 46860
Slurry Seal
$16,401
2023
Tustin Ave
South End
Santa Isabel Ave
330
37 12700
Slurry Seal
$4,445
2023
Tustin Ave
Santa Isabel Ave
North End
580
37 25400
Slurry Seal
$8,890
1 2023
Via Marina
Tustin Ave
End
486
33 18538
Slurry Seal
$6,488
2023
Via Oporto
Via Lido
Central Ave
600
29 17400
Slurry Seal
$6,090
2023
Vivian Ln
Beryl Ln
Diana Ln
794
34 28196
Slurry Seal
$9,869
2023
Warwick Ln
Estelle Ln
Marian Ln
742
33 24486
Slurry Seal
$8,570
2023
Warwick Ln
Marian Ln
Nottingham Rd
244
33 8052
Slurry Seal
$2,818
2023
West Wind Way
Polaris Dr
End
822
34 29448
Slurry Seal
$10,307
2023
Westcliff Dr
Dover Dr
Santiago Dr
1,531
32 48992
Slurry Seal
$17,147
2023
White Cliffs Dr
Polaris Dr
North Star Ln
224
38 8400
Slurry Seal
$2,940
2023
Windward Ln
Tustin Ave
Irvine Ave
1,290
33 42570
Slurry Seal
$14,900
2023
Windward Ln
Tradewinds Ln
Leeward Ln
1,420
33 48060
Slurry Seal
$16,821
2023
Yawl Rd
Beacon Bay
End
250
24 6000
Slurry Seal
$2,100
2023
Rigel Cir
Galaxy Dr
End
170
56 12020
Mill and Overlay
$173,323
2024
C St
Balboa Blvd East
Ocean Front East
80 20
1600
Reconstruction
$34,147
2024
Collins Ave
Bay Front North
Balboa Ave
440
28 12320
Reconstruction
$138,926
2024
Alba St
Eastbluff Dr
Aralia St
137
36 4932
Slurry Seal
$1,778
2024
Alder PI
Alta Vista Dr
End
305
32 9760
Slurry Seal
$3,519
2024
Aleppo St
Alta Vista Dr
End
385
32 12320
Slurry Seal
$4,441
2024
Alta Vista Dr
Carob St
Bison Ave
2,220
36 79920
Slurry Seal
$28,811
2024
Azure Ave
Orchid St
Bay View Ave
630
35 22050
Slurry Seal
$7,949
2024
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
1,110
61 67710
Slurry Seal
$24,410
2024
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
1,225
48 58800
Slurry Seal
$21,198
2024
Bay Farm PI
Upper Bay Dr
End
425
34 14450
Slurry Seal
$5,209
2024
Bay View Ave
Orchard Dr
Zenith Ave
1,200
35 42000
Slurry Seal
$15,141
2024
Bayview Way EB
Bayview PI
Jamboree Rd
587
33 1 21371
1 Slurry Seal
$7,704
1 2024
Bayview Way WB
Jamboree Rd
Bayview PI
617
32 19744
Slurry Seal
$7,118
2024
Bellis St
Alta Vista Dr
End
475
32 15200
Slurry Seal
$5,480
2024
Bison Ave
Bamboo St
Jamboree Rd
1,105
36 41780
Slurry Seal
$15,062
2024
6-61
Appendix A - Local Streets

Page 5 of 18 ends

Appendix A J000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Bixia St
Eastbluff Dr
Bamboo St
150
35 5250
Slurry Seal
$1,893
2024
Blackthorn St
Bellis St
Bison Ave
1,385
34 47090
Slurry Seal
$16,976
2024
Bowsprit Dr
MacArthur Blvd
Dove St
306
44 13464
Slurry Seal
$4,854
2024
Cacao St
Eastbluff Or
Catalpa St
150
36 5400
Slurry Seal
$1,947
2024
Camelback St
Jamboree Rd
La Felicidad
1,505
40 60825
Slurry Seal
$21,928
2024
Celtis PI
Alta Vista Dr
End
190
54 10260
1 Slurry Seal
$3,699
2024
Cercis PI
Alta Vista Dr
End
220
32 7040
Slurry Seal
$2,538
2024
Chestnut PI
Alta Vista Dr
End
220
32 7040
Slurry Seal
$2,538
2024
Corinthian Way
MacArthur Blvd
Birch St
876
44 38544
Slurry Seal
$13,895
2024
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
1,320
36 47520
Slurry Seal
$17,131
2024
Cypress St (S/A Heights)
Orchard Dr
Cul De Sac
980
36 35280
Slurry Seal
$12,719
2024
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
260
36 9360
Slurry Seal
$3,374
2024
Dolphin -Striker Way
Dove St
End
335
44 16740
Slurry Seal
$6,035
2024
Dove St
Campus Dr
Birch St
585
37 21645
1 Slurry Seal
$7,803
2024
Indus St
Kline Dr
West End
800
33 28400
Slurry Seal
$10,238
2024
Kline Dr
South End
Orchard Dr
625
28 19000
Slurry Seal
$6,850
2024
Kline Dr
Pegasus St
North End
570
33 21060
Slurry Seal
$7,592
2024
La Felicidad
Camelback St
La Salud
300
44 13200
Slurry Seal
$4,759
2024
La Salud
North End
La Vida
499
44 23956
Slurry Seal
$8,636
2024
La Salud
La Vida
Corsica Dr N
1,335
44 58740
Slurry Seal
$21,176
2024
La Salud
Corsica Dr N
La Felicidad
1,005
44 44220
Slurry Seal
$15,941
2024
La Salud
La Felicidad
South End
431
44 20964
Slurry Seal
$7,558
2024
La Vida
University Or
La Salud
843
44 40092
Slurry Seal
$14,453
2024
Marine Ave
South Bridge End
North Bridge End
400
20 8000
Slurry Seal
$2,884
2024
Marine Ave
North Bridge End
Bayside Dr
300
20 10800
Slurry Seal
$3,893
2024
Martingale Way
Corinthian Way
End
562
44 26228
Slurry Seal
$9,455
2024
Mesa Dr
Mesa Dr/Birch St
Cypress St
1,140
37 42180
Slurry Seal
$15,206
2024
Mesa Dr
Cypress St
End
1,345
37 49765
Slurry Seal
$17,940
2024
Orchard Dr
Irvine Ave
Birch St
800
40 32000
Slurry Seal
$11,536
2024
Orchard Dr
Birch St
Cypress St
630
36 22680
Slurry Seal
$8,176
2024
Orchard Dr
Cypress St
Orchid St
465
35 16275
Slurry Seal
$5,867
2024
Orchard Dr
Bay View Ave
End
148
35 5180
Slurry Seal
$1,867
2024
Orchid Hill PI
Upper Bay Dr
End
425
34 14450
Slurry Seal
$5,209
2024
Orchid St
Zenith Ave
Orchard Dr
957
35 33495
Slurry Seal
$12,075
2024
Orchid St
Orchard Or
Azure Ave
500
35 17500
Slurry Seal
$6,309
2024
Pegasus St
Santa Ana Ave
Kline Dr
1,177
33 38841
Slurry Seal
$14,002
2024
Redlands Or
Orchard Or
Indus St
565
33 18645
Slurry Seal
$6,722
2024
Riverside Dr
Indus St
End
210
33 8430
Slurry Seal
$3,039
2024
Riverside Dr
Orchard Or
End
520
33 18960
Slurry Seal
$6,835
2024
Scott Dr
Corinthian Way
Dove St
513
44 22572
Slurry Seal
$8,137
2024
Spruce Ave
Bristol St South
Azure Ave
1,824
35 63840
Slurry Seal
$23,015
2024
Spruce St
Bristol St North
Quail St
600
60 36000
Slurry Seal
$12,978
2024
Upper Bay Dr
Mesa Dr
Orchid Hill PI
527
36 18972
Slurry Seal
$6,839
2024
Vista Del Oro
Vista Nobleza
Vista Umbrosa
1,880
35 65800
Slurry Seal
$23,721
2024
Westerly PI
Dove St
Quail St
1,406
44 61864
Slurry Seal
$22,302
2024
Zenith Ave
Bayview Ave
Spruce Ave
283
35 9905
Slurry Seal
$3,571
2024
Balboa Blvd E WB
G St
D St
1,066
22 23452
Mill and Overlay
$348,312
2025
C St
North End
Balboa Blvd East
78 15
1170
Reconstruction
$1,390
2025
Marigold Ave
Ocean Blvd
Seaview Ave
1 370
1 27
1 9990
1 Reconstruction
1 $18,102
1 2025
6-62
Appendix A - Local Streets

Page 6 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Santa Ana Ave
Clay St
15th St
627
20 12540
Reconstruction
$14,528
2025
Avocado Ave SB
167' S/O San Joaquin Hills
Bus Station
107
22 3674
Slurry Seal
$1,364
2025
Blue Key
Sandcastle Dr
End
750
32 26700
Slurry Seal
$9,914
2025
Blue Water Dr
Salt Air Dr
Crown Dr North
1,100
32 35028
Slurry Seal
$13,007
2025
Cabrillo Ter
Serra Or
De Anza Dr
869
23 19787
Slurry Seal
$7,347
2025
Catamaran Dr
Keel Dr
End
975
36 37350
Slurry Seal
$13,869
2025
Columbus Cir
Serra Or
End
112
22 3464
Slurry Seal
$1,286
2025
Crown Dr
Sea Ln
Crown Dr North
1,152
37 42624
Slurry Seal
$15,827
2025
De Anza Dr
Seaward Rd
De Sola Ter
750
35 26250
Slurry Seal
$9,747
2025
Ebbtide Rd
Crown Dr
Sandpiper Dr
1,317
33 43461
Slurry Seal
$16,138
2025
Civic Center Dr
Avocado Ave
Newport Center Dr
1,559
48 74832
Slurry Seal
$27,786
2025
Fernleaf Ave
Coast Highway East
Fifth Ave
370
27 9990
Slurry Seal
$3,709
2025
Fifth Avenue
Marguerite Ave
Marigold Ave
320
36 11520
Slurry Seal
$4,278
2025
Fifth Avenue
Marigold Ave
Poppy Ave
1,175
36 42300
Slurry Seal
$15,707
2025
First Ave
Acacia Ave
Begonia Ave
272
27 7344
Slurry Seal
$2,727
2025
First Ave
Begonia Ave
Carnation Ave
270
27 7290
Slurry Seal
$2,707
2025
Fourth Ave
Goldenrod Ave
Heliotrope Ave
260
27 7020
Slurry Seal
$2,607
2025
Fourth Ave
Heliotrope Ave
Iris Ave
268
27 7236
Slurry Seal
$2,687
2025
Fourth Ave
Larkspur Ave
Marguerite Ave
280
27 7560
Slurry Seal
$2,807
2025
Fourth Ave
Narcissus Ave
Orchid Ave
273
27 7371
Slurry Seal
$2,737
2025
Fourth Ave
Poinsettia Ave
Poppy Ave
269
27 7263
Slurry Seal
$2,697
2025
Goldenrod Ave
Coast Highway East
Fourth Ave
190
27 5130
Slurry Seal
$1,905
2025
Goldenrod Ave
Fourth Ave
Fifth Ave
350
27 9450
Slurry Seal
$3,509
2025
Goldenrod Ave
Harbor View Dr
Crown Dr
1,165
33 38445
1 Slurry Seal
$14,275
2025
Goldenrod Ave
Crown Dr
Wavecrest Or
635
35 22225
Slurry Seal
$8,253
2025
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
685
38 26030
Slurry Seal
$9,665
2025
Harbor View Dr
Goldenrod Ave
Marguerite Ave
1,945
38 73910
Slurry Seal
$27,444
2025
Hazel Dr
Poppy Ave (south side)
Coast Highway East
1,375
21 29875
Slurry Seal
$11,093
2025
Heliotrope Ave
Coast Highway East
Fifth Ave
785
27 21195
Slurry Seal
$7,870
2025
Inlet Dr
Marguerite Ave
Keel Dr
150
36 5400
Slurry Seal
$2,005
2025
Inlet Isle Dr
Topside Ln
Sandcastle Dr
1,088
32 37066
Slurry Seal
$13,763
2025
Iris Ave
Coast Highway East
Fifth Ave
945
27 25515
Slurry Seal
$9,474
2025
Island View Or
Salt Air Dr
Lighthouse Ln
815
32 26080
Slurry Seal
$9,684
2025
Jasmine Ave
Coast Highway East
Third Ave
508
27 13716
Slurry Seal
$5,093
2025
Jasmine Ave
Third Ave
Fifth Ave
760
27 20520
Slurry Seal
$7,619
2025
Keel Dr
Catamaran Dr
Outrigger Dr
583
32 21014
Slurry Seal
$7,803
2025
Keel Dr
Outrigger Dr
End
1,394
32 46108
Slurry Seal
$17,121
2025
Larkspur Ave
Coast Highway East
Fifth Ave
1,406
27 37962
1 Slurry Seal
$14,096
2025
Lighthouse Ln
Salt Air Dr
Blue Water Dr
1,065
32 35580
Slurry Seal
$13,211
2025
Marigold Ave
Coast Highway East
Third Ave
825
27 22275
Slurry Seal
$8,271
2025
Marigold Ave
Third Ave
Fourth Ave
345
27 9315
Slurry Seal
$3,459
2025
Morning Canyon Rd
Serra Dr
Seaward Rd
920
35 32200
Slurry Seal
$11,956
2025
Morning Canyon Rd
Seaward Rd
Coast Highway East
350
35 12250
Slurry Seal
$4,549
2025
Narcissus Ave
Fifth Ave
Geranium
344
36 12384
Slurry Seal
$4,598
2025
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir (North Side)
2,684
19 50996
Slurry Seal
$18,936
2025
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
5,650
24 1 142100
1 Slurry Seal
$52,764
2025
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
1,352
24 31798
Slurry Seal
$11,807
2025
Orchid Ave
lCoast Highway East
Third Ave
850
1 28
23800
Slurry Seal
1 $8,837
1 2025
Outrigger Dr
IKeelDr
ISandcastle Dr
1,454
1 33
47255
Slurry Seal
1 $17,547
1 2025
6-63
Appendix A - Local Streets

Page 7 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Pacific Or
Begonia Ave
Acacia Ave
330
27 8910
Slurry Seal
$3,308
2025
Pacific Dr
Acacia Ave
Avocado Ave
305
27 8235
Slurry Seal
$3,058
2025
Park Green Or
Sausalito Or
Sandcastle Dr
1,110
40 44400
Slurry Seal
$16,487
2025
Pebble Or
Goldenrod Ave
Sandpiper Dr
1,247
34 42398
Slurry Seal
$15,743
2025
Poppy Ave
Second Ave
Fifth Ave
1,150
27 31050
Slurry Seal
$11,529
2025
Portside Way
Windover Or
Wavecrest Or
576
32 18432
1 Slurry Seal
$6,844
2025
San Clemente Or
Santa Barbara Dr
Santa Cruz Dr
1,140
48 54720
Slurry Seal
$20,319
2025
Sand Key
Park Green Or
End
501
33 17783
Slurry Seal
$6,603
2025
Sand Point Way
Windover Or
Wavecrest Or
280
36 11580
Slurry Seal
$4,300
2025
Sandcastle Dr
Tiller Way
Inlet Isle Dr
2,588
36 93168
Slurry Seal
$34,595
2025
Sandcastle Dr
Inlet Isle Or
Park Green Dr
654
36 23544
Slurry Seal
$8,742
2025
Sandcastle Dr
Park Green Or
Seacrest Or
975
36 35100
Slurry Seal
$13,033
2025
Sandcastle Dr
Seacrest Or
Catamaran Or
1,465
36 52740
Slurry Seal
$19,583
2025
Sandune Ln
Inlet Isle Or
End
670
32 23240
1 Slurry Seal
$8,629
2025
Sea Ln
Crown Dr
Harbor View Dr
1,078
38 40964
Slurry Seal
$15,211
2025
Sea Ln
Harbor View Or
Goldenrod Ave
1,340
37 49580
Slurry Seal
$18,410
2025
Seacrest Dr
Catamaran Dr
Sandcastle Or
1,475
32 47200
Slurry Seal
$17,526
2025
Second Ave
Jasmine Ave
Marguerite Ave
536
27 14472
Slurry Seal
$5,374
2025
Second Ave
Narcissus Ave
Orchid Ave
269
27 7263
Slurry Seal
$2,697
2025
Second Ave
Orchid Ave
Poinsettia Ave
268
27 7236
Slurry Seal
$2,687
2025
Second Ave
Poinsettia Ave
Poppy Ave
270
27 7290
Slurry Seal
$2,707
2025
Second Ave
Poppy Ave
Hazel Ave
125
27 3375
1 Slurry Seal
$1,253
2025
Starboard Way
Windover Or
Wavecrest Or
357
32 11424
Slurry Seal
$4,242
2025
Surfline Way
Windover Or
Wavecrest Or
658
32 22556
Slurry Seal
$8,375
2025
Third Ave
Heliotrope Ave
Iris Ave
263
27 7101
Slurry Seal
$2,637
2025
Third Ave
Iris Ave
Jasmine Ave
270
27 7290
Slurry Seal
$2,707
2025
Third Ave
Larkspur Ave
Marguerite Ave
276
27 7452
Slurry Seal
$2,767
2025
Third Ave
Narcissus Ave
Orchid Ave
264
28 7392
Slurry Seal
$2,745
2025
Third Ave
Orchid Ave
Poinsettia Ave
265
28 7420
Slurry Seal
$2,755
2025
Third Ave
Poinsettia Ave
Poppy Ave
270
28 7560
1 Slurry Seal
$2,807
2025
Tiller Way
Sandcastle Dr
Sausalito Dr
1,475
36 53100
Slurry Seal
$19,717
2025
Topside Ln
Sandcastle Or
Inlet Isle Dr
626
32 20782
Slurry Seal
$7,717
2025
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
1,493
37 55241
Slurry Seal
$20,512
2025
Vista Ridge Rd
Ocean Heights Dr
Coastal Canyon Or
2,067
37 76479
Slurry Seal
$28,398
2025
Vista Ridge Rd
Ocean Heights Or
Ridge Park Rd
619
37 22903
Slurry Seal
$8,504
2025
Wavecrest Or
Surfline Wy
Sand Point Wy
1,060
36 41660
Slurry Seal
$15,469
2025
White Sails Way
Crown Dr
Harbor View Dr
1,045
33 34485
Slurry Seal
$12,805
2025
Windover Or
Surfline Way
Sand Point Way
1,023
36 38328
1 Slurry Seal
$14,232
2025
Newport Ridge Dr East
San Joaquin Hills Rd
Park Crest
1,520
40 59300
Slurry Seal
$22,019
2025
Newport Ridge Dr East
Park Crest
St Michael
2,215
40 88600
Slurry Seal
$32,899
2025
Eastgate Or
Newport Hills Dr East
San Miguel Or
270
56 11110
Mill and Overlay
$169,957
2026
23rd St
Tustin Ave
Irvine Ave
778
35 27230
Mill and Overlay
$416,556
2026
Santa Ana Ave
Cliff Dr
Clay St
1,655
20 33100
Reconstruction
$39,497
2026
16th St W
West End
Placentia Ave
2,400
36 86400
Mill and Overlay
$1,361,373
2027
Bonnie Doon Ter
Dolphin Ter
Patolita Or
1,067
37 39479
Mill and Overlay
$622,056
2027
Garnet Ave
Bay Front North
Park Ave
481
27 12987
Reconstruction
$409
2027
10th St
North End
Bay Ave West
36 26
936
Slurry Seal
$369
2027
loth St
1 Bay Ave West
1 Balboa Blvd West
216
28 5180
Slurry Seal
1 $2,041
2027
15th St
lirvine Ave
I St Andrew Rd
560
62 33720
Slurry Seal
1 $13,283
2027
6-64
Appendix A - Local Streets

Page 8 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
15th St
St Andrew Rd
Kings PI
1,180
35 41300
Slurry Seal
$16,269
2027
15th St
Kings PI
St James PI
210
35 7350
Slurry Seal
$2,895
2027
18th St
North End
Balboa Blvd West
300
28 8400
Slurry Seal
$3,309
2027
28th St
East End
Villa Way
75 14
1050
Slurry Seal
$414
2027
29th St
East End
Lafayette Ave
75 24
1800
Slurry Seal
$709
2027
29th St
Lafayette Ave
Newport Blvd NB
535
24 12840
1 Slurry Seal
$5,058
2027
30th St
Villa Way
Newport Blvd
450
25 11250
Slurry Seal
$4,432
2027
30th St
Newport Blvd
180' E of Balboa Blvd
220
34 7480
Slurry Seal
$2,947
2027
31st St
Lafayette Ave
Villa Way
351
24 8424
Slurry Seal
$3,318
2027
31st St
Balboa Blvd
Ocean Front West
376
32 12032
Slurry Seal
$4,740
1 2027
32nd St
Seashore Dr
Ocean Front West
190
16 3040
Slurry Seal
$1,198
2027
33rd St
East End
Marcus Ave
75 18
1350
Slurry Seal
$532
2027
33rd St
Marcus Ave
Lake Ave
220
18 3960
Slurry Seal
$1,560
2027
33rd St
Lake Ave
Balboa Blvd
275
18 4950
1 Slurry Seal
$1,950
2027
33rd St
Balboa Blvd
Seashore Dr
248
20 4960
Slurry Seal
$1,954
2027
33rd St
Seashore Dr
Ocean Front West
135
16 2160
Slurry Seal
$851
2027
34th St
Clubhouse Ave
Rivo Alto
165
16 2640
Slurry Seal
$1,040
2027
34th St
Rivo Alto
Marcus Ave
66 16
1056
Slurry Seal
$416
2027
34th St
Marcus Ave
Lake Ave
216
18 3888
Slurry Seal
$1,532
2027
34th St
Lake Ave
Balboa Blvd
280
18 5040
Slurry Seal
$1,985
2027
34th St
Balboa Blvd
Seashore Dr
257
18 4756
Slurry Seal
$1,874
2027
34th St
Seashore Dr
Ocean Front West
100
17 1700
Slurry Seal
$670
2027
35th St
Short St
Finley Ave
305
16 4880
Slurry Seal
$1,922
2027
35th St
Finley Ave
Rivo Alto
70 16
1120
Slurry Seal
$441
2027
35th St
Rivo Alto
Marcus Ave
85 16
1360
Slurry Seal
$536
2027
35th St
Seashore Dr
Ocean Front West
90 20
1800
Slurry Seal
$709
2027
36th St
Short St
Clubhouse Ave
340
16 5440
Slurry Seal
$2,143
2027
36th St
Finley Ave
Short St
305
16 4880
Slurry Seal
$1,922
2027
36th St
Finley Ave
End
70 16
1120
Slurry Seal
$441
2027
36th St
Balboa Blvd
Seashore Dr
195
20 3124
Slurry Seal
$1,231
2027
37th St
48' E of Park Ln
Park Ln
48 20
960
Slurry Seal
$378
2027
37th St
Balboa Blvd
Seashore Dr
284
20 5340
Slurry Seal
$2,104
2027
38th St
Channel PI
Finley Ave
226
16 3616
Slurry Seal
$1,424
2027
38th St
Marcus Ave
East End of Bridge
83 16
1328
Slurry Seal
$523
2027
39th St
Channel PI
Marcus Ave
275
16 4400
Slurry Seal
$1,733
2027
40th St
Channel PI
Marcus Ave
130
16 2080
Slurry Seal
$819
2027
40th St
Marcus Ave
Rivo Alta
35 16
560
Slurry Seal
$221
2027
44th St
Channel PI
Balboa Blvd
100
21 2100
Slurry Seal
$827
2027
47th St
River Ave
Neptune Ave
315
21 6615
Slurry Seal
$2,606
2027
47th St
Neptune Ave
Seashore Dr
84 20
1680
Slurry Seal
$662
2027
49th St
River Dr
Neptune Ave
245
20 4900
Slurry Seal
$1,930
2027
50th St
River Ave
Neptune Ave
230
20 4600
Slurry Seal
$1,812
2027
51st St
River Ave
Seashore Dr
330
20 6600
Slurry Seal
$2,600
2027
52nd St
River Ave
Neptune Ave
215
20 4300
Slurry Seal
$1,694
2027
53rd St
River Ave
Neptune Ave
181
20 3620
Slurry Seal
$1,426
2027
54th St
River Ave
Neptune Ave
140
38 5320
Slurry Seal
$2,096
2027
61st St
Seashore Dr
Ocean Front West
85 19
1615
Slurry Seal
$636
2027
62nd St
lCanal St
lCedarSt
860
29 24940
Slurry Seal
$9,825
2027
62nd St
Cedar St
Lancaster St
480
29 13920
Slurry Seal
$5,484
2027
62nd St
I Newport Shores Dr
I Coast Highway West
165
18 2970
Slurry Seal
$1,170
2027
6-65
Appendix A - Local Streets

Page 9 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
62nd St
Seashore Dr
Ocean Front Alley West
55 18
990
Slurry Seal
$390
2027
Aliso Ave
15th St
Clay St
643
35 22505
Slurry Seal
$8,865
2027
Aliso Ave
Clay St
Beacon St
667
35 23345
Slurry Seal
$9,196
2027
Aliso Ave
Beacon St
Cliff Dr
420
35 14700
Slurry Seal
$5,791
2027
Avon St
West End
Riverside Ave
835
21 18747
Slurry Seal
$7,385
2027
Avon St
Riverside Ave
Tustin Ave
458
34 15572
Slurry Seal
$6,134
2027
B St
Ocean Front East
South End
320
60 19200
Slurry Seal
$7,563
2027
Bay Ave W
19th St
18th St
425
42 24350
Slurry Seal
$9,592
2027
Bay Ave W
An St
6th St
450
28 12600
Slurry Seal
$4,964
2027
Beacon St
Tustin Ave
Aliso Ave
600
35 21000
Slurry Seal
$8,273
2027
Beacon St
Aliso Ave
Irvine Ave
638
35 22330
Slurry Seal
$8,796
2027
Bolsa Ave
Clay St
15th St
406
36 14616
1 Slurry Seal
$5,758
2027
Broad St
Bolsa Ave
Westminster Ave
628
36 22608
Slurry Seal
$8,906
2027
Broad St
Santa Ana Ave
San Bernardino Ave
280
16 4480
Slurry Seal
$1,765
2027
Canal Cir
Canal St
Canal St
265
29 7685
Slurry Seal
$3,027
2027
Canal St
62nd St
Canal Cir (West End)
270
30 8100
Slurry Seal
$3,191
2027
Canal St
Canal Cir (West End)
Sunset Dr
420
30 12600
Slurry Seal
$4,964
2027
Canal St
Sunset Dr
Grant St
969
30 29070
Slurry Seal
$11,452
2027
Cedar St
East End
Prospect St
300
29 8700
Slurry Seal
$3,427
2027
Cedar St
Newport Shores Dr
Coast Highway West
185
19 3515
Slurry Seal
$1,385
2027
Cedar St
Seashore Dr
Ocean Front Alley West
57 19
1083
Slurry Seal
$427
2027
Channel PI
Balboa Blvd
Rivo Alto (River)
295
21 6195
Slurry Seal
$2,440
2027
Channel PI
Rivo Alto
39th St
743
16 11888
Slurry Seal
$4,683
2027
Channel PI
39th St
Rialto
440
16 7040
Slurry Seal
$2,773
2027
Clay St
15th St
St Andrews Rd
760
34 25840
Slurry Seal
$10,179
2027
Clay St
St Andrews Rd
Irvine Ave
658
34 22372
1 Slurry Seal
$8,813
2027
Cliff Dr
Irvine Ave
Riverside Ave
1,684
56 92820
Slurry Seal
$36,565
2027
Cliff Dr
Santa Ana Ave
La Jolla Dr
300
52 15600
Slurry Seal
$6,145
2027
Clubhouse Ave
Newport Island Channel
Rivo Alto
1,057
17 17441
Slurry Seal
$6,870
2027
Coast Blvd
61st St
End
133
30 3990
Slurry Seal
$1,572
2027
Coral PI
Irvine Ave
St Andrews Ave
802
35 28070
Slurry Seal
$11,058
2027
El Modena Ave
Beacon St
Clay St
667
35 23345
Slurry Seal
$9,196
2027
El Modena Ave
Clay St
15th St
655
35 22925
Slurry Seal
$9,031
2027
Fifth Avenue
Dahlia Ave
Heliotrope Ave
895
33 29535
1 Slurry Seal
$11,635
2027
Fifth Avenue
Heliotrope Ave
Iris Ave
290
32 9280
Slurry Seal
$3,656
2027
Finley Ave
Newport Blvd
Clubhouse Ave
190
16 3040
Slurry Seal
$1,198
2027
Finley Ave
Clubhouse Ave
End
665
16 10640
Slurry Seal
$4,191
2027
Finley Ave
Rialto
38th St
35 16
560
Slurry Seal
$221
2027
Finley Ave
38th St
Channel PI
220
16 3520
Slurry Seal
$1,387
2027
Fullerton Ave
Cliff Dr
Beacon St
423
35 14805
Slurry Seal
$5,832
2027
Fullerton Ave
Beacon St
Clay St
667
35 23345
Slurry Seal
$9,196
2027
Fullerton Ave
Clay St
15th St
643
35 22505
1 Slurry Seal
$8,865
2027
Grant St
North End
Coast Highway West
325
29 9425
Slurry Seal
$3,713
2027
Highland St
North End
Coast Highway West
260
30 7800
Slurry Seal
$3,073
2027
Highland St
Seashore Dr
Ocean Front Alley West
72 17
1224
Slurry Seal
$482
2027
Hospital Rd
Newport Blvd
Old Newport Blvd
160
70 11200
Slurry Seal
$4,412
2027
Irvine Ave
Clay St
15th St
630
38 23940
Slurry Seal
$9,431
2027
Irvine Ave
15th St
16th St
1,267
62 78554
Slurry Seal
$30,945
2027
Kings PI
St James Rd
Kings Rd
1,888
35 66080
Slurry Seal
$26,031
2027
Kings Rd
I St Andrews Rd
Kings PI
1 1,915
35 67025
Slurry Seal
$26,403
2027
6-66
Appendix A - Local Streets

Page 10 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
La Jolla Or
End
Cliff Dr
227
20 4540
Slurry Seal
$1,788
2027
La Jolla Dr
Cliff Dr
Beacon St
715
20 14300
Slurry Seal
$5,633
2027
Lafayette Ave
28th St
31st St
860
24 21140
Slurry Seal
$8,328
2027
Lake Ave
50' S of 38th St
36th St
320
25 8000
Slurry Seal
$3,151
2027
Lake Ave
36th St
35th St
205
26 5330
Slurry Seal
$2,100
2027
Lake Ave
35th St
34th St
205
26 5330
1 Slurry Seal
$2,100
2027
Lake Ave
34th St
33rd St
205
26 5330
Slurry Seal
$2,100
2027
Lake Ave
33rd St
32nd St
205
26 5330
Slurry Seal
$2,100
2027
Lancaster St
62nd St
61st St
79 30
2370
Slurry Seal
$934
2027
Lancaster St
Canal St
30' S of End
60 29
1740
Slurry Seal
$685
2027
Lindo Ave
Bay Ave West
Alley N of Bay Ave West
553
23 12719
Slurry Seal
$5,010
2027
Lugonia St
Seashore Dr
Ocean Front Alley West
59 19
1121
Slurry Seal
$442
2027
Marcus Ave
32nd St
33rd St
213
26 5538
Slurry Seal
$2,182
2027
Marcus Ave
33rd St
34th St
229
26 5954
1 Slurry Seal
$2,345
2027
Marcus Ave
34th St
35th St
209
26 5434
Slurry Seal
$2,141
2027
Marcus Ave
35th St
36th St
220
26 5720
Slurry Seal
$2,253
2027
Newport Shores Dr
Orange St
Walnut St
632
20 12640
Slurry Seal
$4,979
2027
Newport Shores Or
Walnut St
61st St
827
20 16540
Slurry Seal
$6,516
2027
Nordina St
Seashore Dr
Ocean Front Alley West
85 17
1445
Slurry Seal
$569
2027
Ocean View Ave
Tustin Ave
Cliff Dr
922
24 22128
Slurry Seal
$8,717
2027
Olive St
Seashore Dr
Ocean Front West
172
17 2924
Slurry Seal
$1,152
2027
Orange Ave
Old Newport Blvd
15th St
436
36 15696
Slurry Seal
$6,183
2027
Orange St
Canal St
Coast Highway West
468
35 16380
Slurry Seal
$6,453
2027
Orange St
Coast Highway West
Ocean Front Alley West
166
32 5312
Slurry Seal
$2,093
2027
Palm St
Bay AveEast
Balboa Blvd East
193
34 6562
Slurry Seal
$2,585
2027
Palm St
Balboa Blvd East
Ocean Front Alley East
75 31
2325
Slurry Seal
$916
2027
Palm St
Ocean Front Alley East
Ocean Front East
135
31 4185
Slurry Seal
$1,649
2027
Park Ln
38th St
36th St
442
24 10608
Slurry Seal
$4,179
2027
Pirate Rd
Cliff Dr
Clay St
821
35 28735
Slurry Seal
$11,320
2027
Prospect St
Canal St
Cedar St
856
29 24824
Slurry Seal
$9,779
2027
Prospect St
Cedar St
Newport Shores Dr
785
29 22765
Slurry Seal
$8,968
2027
Prospect St
Newport Shores Dr
Coast Highway West
180
24 4320
Slurry Seal
$1,702
2027
Prospect St
Coast Highway West
Seashore Dr
75 46
3450
Slurry Seal
$1,359
2027
Redlands Ave
15th St
Clay St
680
34 23120
Slurry Seal
$9,108
2027
Redlands Ave
Clay St
Cliff Dr
730
34 24820
Slurry Seal
$9,777
2027
River Ave
42nd St
Channel PI
340
28 9520
Slurry Seal
$3,750
2027
River Ave
Alley #325
Balboa Blvd
330
25 8250
Slurry Seal
$3,250
2027
River Ave
51st St
End
1,250
38 47500
Slurry Seal
$18,712
2027
Riverside Ave
Coast Highway West
Avon St (West Side)
475
52 24700
Slurry Seal
$9,730
2027
Riverside Ave
Avon St
Cliff Dr
943
52 49036
Slurry Seal
$19,317
2027
San Bernardino Ave
15th St
Clay Ave
630
34 21420
Slurry Seal
$8,438
2027
San Bernardino Ave
Clay Ave
Cliff Dr
860
14 12040
Slurry Seal
$4,743
2027
Santa Ana Ave
Cliff Dr
Clay St
1,655
34 56270
Slurry Seal
$22,167
2027
Santa Ana Ave
Clay St
15th St
627
36 22572
Slurry Seal
$8,892
2027
Santa Ana Ave
15th St
City Limit
640
19 12160
Slurry Seal
$4,790
2027
Sea Gull Ln
Sherington PI
16th St
900
37 1 33300
1 Slurry Seal
$13,118
2027
Seashore Dr
36th St
33rd St
690
28 19320
Slurry Seal
$7,611
2027
Seashore Dr
39th St
36th St
690
28 19320
Slurry Seal
$7,611
1 2027
Seashore Dr
42nd St
39th St
650
28 18200
Slurry Seal
$7,170
2027
Seashore Dr
42nd St
45th St
630
28 17640
Slurry Seal
$6,949
2027
6-67
Appendix A - Local Streets

Page 11 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Seashore Dr
46tth St
45th St
205
28 5740
Slurry Seal
$2,261
2027
Seashore Dr
46th St
53rd St
1,500
28 42000
Slurry Seal
$16,545
2027
Seashore Dr
60th St
Prospect St
630
28 17640
Slurry Seal
$6,949
2027
Sherington PI
Irvine Ave
Sea Gull Ln
1,432
37 52984
Slurry Seal
$20,872
2027
Short St
Newport Blvd
Clubhouse Ave
135
32 4320
Slurry Seal
$1,702
2027
Short St
Clubhouse Ave
End
315
16 5040
1 Slurry Seal
$1,985
2027
Signal Rd
Kings Rd
15th St
1,190
35 41650
Slurry Seal
$16,407
2027
Snug Harbor Rd
Cliff Dr
Clay St
936
35 32760
Slurry Seal
$12,905
2027
Sonora St
Seashore Dr
Ocean Front Alley West
95 16
1520
Slurry Seal
$599
2027
St Andrews Rd
Kings Rd
Clay St
1,045
34 35530
Slurry Seal
$13,996
2027
St Andrews Rd
Clay St
15th St
600
34 20400
Slurry Seal
$8,036
2027
St James PI
15th St
St lames Rd
641
35 24635
Slurry Seal
$9,704
2027
St James Rd
15th St
St lames PI
945
35 35275
Slurry Seal
$13,896
2027
Sunset Dr
Lugonia St
End
363
29 10527
Slurry Seal
$4,147
2027
The Arcade
22nd St
21st St
167
10 1670
Slurry Seal
$658
2027
Tustin Ave
Coast Highway West
Ocean View Ave (S))
400
34 13600
Slurry Seal
$5,357
2027
Tustin Ave
Cliff Dr
Clay St
807
35 28245
Slurry Seal
$11,127
2027
Via Antibes
Via Lido Soud
Via Lido Nord
248
36 8928
Slurry Seal
$3,517
2027
Via Antibes
Via Lido Nord
Via Lido Soud
248
36 8928
Slurry Seal
$3,517
2027
Via Barcelona
Via Lido Soud
Via Lido Nord
327
20 6540
Slurry Seal
$2,576
2027
Via Fermo
Via Lido Soud
Via Firenze
256
16 4096
Slurry Seal
$1,614
2027
Via Firenze
Via Lido Nord
Piazza Lido
447
16 7152
Slurry Seal
$2,817
2027
Via Firenze
Piazza Lido
Via Lido Soud
356
16 5696
Slurry Seal
$2,244
2027
Via Florence
Via Lido Soud
Piazza Lido
270
24 6480
Slurry Seal
$2,553
2027
Via Graziana
Via Havre
Piazza Lido
490
18 8820
Slurry Seal
$3,474
2027
Via Graziana
Piazza Lido
Via Lido Nord
470
16 7520
Slurry Seal
$2,962
2027
Via Jucar
Via Lido Soud
Via Lido Nord
925
23 21275
Slurry Seal
$8,381
2027
Via Koron
Via Lido Soud
Via Lido Nord
910
23 20930
Slurry Seal
$8,245
2027
Via Lido
Bridge (West End)
Via Lido Soud
760
22 28420
Slurry Seal
$11,196
2027
Via Lido Nord
Via Lido Soud (East Side)
Via Zurich
459
33 18647
Slurry Seal
$7,346
2027
Via Lido Nord
Via Zurich
Via Waziers
540
33 17820
Slurry Seal
$7,020
2027
Via Lido Nord
Via Waziers
Via San Remo
661
33 21813
Slurry Seal
$8,593
2027
Via Lido Nord
Via San Remo
Via Palermo
541
33 17853
Slurry Seal
$7,033
2027
Via Lido Nord
Via Palermo
Via Lorca
646
33 21318
Slurry Seal
$8,398
2027
Via Lido Nord
Via Lorca
Via Genoa
769
33 25377
Slurry Seal
$9,997
2027
Via Lido Nord
Via Genoa
Via Dijon
571
33 18843
Slurry Seal
$7,423
2027
Via Lido Nord
Via Dijon
Via Antibes
530
33 17490
Slurry Seal
$6,890
2027
Via Lido Nord
Via Antibes
Via Lido Soud (West Side)
400
20 9200
Slurry Seal
$3,624
2027
Via Lido Soud
Via Lido Nord (West Side)
Via Antibes
280
20 6800
Slurry Seal
$2,679
2027
Via Lido Soud
Via Antibes
Via Dijon
625
33 20625
1 Slurry Seal
$8,125
2027
Via Lido Soud
Via Dijon
Via Genoa
820
33 27060
Slurry Seal
$10,660
2027
Via Lido Soud
Via Genoa
Via Koron
850
33 28050
Slurry Seal
$11,050
2027
Via Lido Soud
Via Koron
Via Orvieto
660
33 21780
Slurry Seal
$8,580
2027
Via Lido Soud
Via Orvieto
Via San Remo
670
33 22110
Slurry Seal
$8,710
2027
Via Lido Soud
Via San Remo
Via Venezia
520
33 17160
Slurry Seal
$6,760
2027
Via Lido Soud
Via Venezia
Via Zurich
660
33 21780
Slurry Seal
$8,580
2027
Via Lido Soud
Via Zurich
Via Lido Nord (East Side)
405
53 24965
Slurry Seal
$9,834
2027
Via Lorca
lVia Lido Soud
Via Lido Nord
875
1 20
1 17500
1 Slurry Seal
$6,894
2027
Via Malaga
IVia Oporto
Via Lido
295
1 22
1 6490
1 Slurry Seal
$2,557
2027
Via Mentone
IVai Lido Soud
Via Lido Nord
850
1 20
1 17000
1 Slurry Seal
$6,697
2027
6-68
Appendix A - Local Streets

Page 12 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Via Nice
Via Lido Soud
Via Lido Nord
810
20 16200
Slurry Seal
$6,382
2027
Via Oporto
32nd St
Via Lido
575
23 13225
Slurry Seal
$5,210
2027
Via Orvieto
Via Lido Soud
Via Lido Nord
785
23 18055
Slurry Seal
$7,112
2027
Via Palermo
Via Lido Soud
Via Lido Nord
762
22 16764
Slurry Seal
$6,604
2027
Via Quito
Vai Lido Soud
Via Lido Nord
710
20 14200
Slurry Seal
$5,594
2027
Via San Remo
Via Lido Soud
Via Lido Nord
630
23 15240
Slurry Seal
$6,004
2027
Via Trieste
Via Lido Soud
Via Lido Nord
600
20 12000
Slurry Seal
$4,727
2027
Via Undine
Via Lido Soud
Via Lido Nord
570
20 11400
Slurry Seal
$4,491
2027
Via Venezia
Via Lido Soud
Via Lido Nord
535
20 10700
Slurry Seal
$4,215
2027
Via Waziers
Via Lido Soud
Via Lido Nord
515
23 11845
Slurry Seal
$4,666
2027
Via Xanthe
Via Lido Soud
Via Lido Nord
490
20 9800
Slurry Seal
$3,861
2027
Via Yella
Via Lido Soud
Via Lido Nord
465
20 9300
1 Slurry Seal
$3,664
2027
Via Zurich
Via Lido Soud
Via Lido Nord
430
21 9030
Slurry Seal
$3,557
2027
Villa Way
28th St
29th St
320
25 8000
Slurry Seal
$3,151
2027
Washington St
Bay Ave East
Balboa Blvd East
140
20 2800
Slurry Seal
$1,103
2027
Washington St
Balboa Blvd East
Ocean Front Alley East
85 14
1190
Slurry Seal
$469
2027
Washington St
Ocean Front East
Ocean Front Alley East
135
14 1890
Slurry Seal
$745
2027
Westminster Ave
Old Newport Blvd
15th St
1,720
36 61920
Slurry Seal
$24,392
2027
Zurich Cir
Via Zurich
Via Zurich
450
16 7200
Slurry Seal
$2,836
2027
La Linda Ct
23rd St
End
199
32 6368
Mill and Overlay
$103,348
2028
Production PI
Monrovia Ave
Placentia Ave
1,265
38 48070
Mill and Overlay
$780,144
2028
20th St
91' S of North End
Balboa Blvd West
325
34 11050
Reconstruction
$15,423
2028
24th St
Balboa Blvd
Ocean Front West
390
16 6240
Reconstruction
$8,710
2028
Diamond Ave
Bay Front North
Balboa Ave
496
28 13888
Reconstruction
$41,023
2028
F St
North End
Balboa Blvd East
145
20 2900
Reconstruction
$3,765
2028
Jasmine Ave
Ocean Blvd
88' N of Ocean Blvd
88 28
2464
1 Reconstruction
$7,998
2028
Ocean Blvd
G St
L St
1,525
36 54900
Reconstruction
$71,282
2028
Park Ave
Collins Ave
Sapphire Ave
660
48 25920
Reconstruction
$76,563
2028
28th St
Newport Blvd West SB
Balboa Blvd
220
60 13200
Slurry Seal
$5,356
2028
54th St
Neptune Ave
Seashore Dr
75 27
2025
Slurry Seal
$822
2028
Acacia Ave
Coast Highway East
Second Ave
1,075
27 29025
Slurry Seal
$11,777
2028
Acacia Ave
Second Ave
Pacific Dr
717
27 19359
Slurry Seal
$7,855
2028
Aldebaran Cir
Galaxy Dr
End
135
55 9925
Slurry Seal
$4,027
2028
Anita Ln
Estelle Ln
Marian Ln
1,102
33 36366
Slurry Seal
$14,755
2028
Antigua Cir
Santiago Dr
End
165
33 7945
Slurry Seal
$3,224
2028
Antigua Way
Santiago Dr (North End)
Mariners Dr
1,980
37 74460
Slurry Seal
$30,212
2028
Antigua Way
Mariners Dr
Santiago Dr (South End)
1,006
35 35210
Slurry Seal
$14,286
2028
Ashford Ln
Glenwood Ln
Santiago Dr
315
33 10995
Slurry Seal
$4,461
2028
Avocado Ave
Pacific Dr
160' N of Pacific Dr
160
16 2560
Slurry Seal
$1,039
2028
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
1,649
22 36278
1 Slurry Seal
$14,720
2028
Back Bay Dr
End of PCC Section
Backbay sewer pump station
3,106
22 68332
Slurry Seal
$27,726
2028
Baycrest Rd
Irvine Ave
Tradewinds Ln
238
38 9044
Slurry Seal
$3,670
2028
Bayport Way
Holiday Rd
South End
232
33 7656
Slurry Seal
$3,106
2028
Bayport Way
Francisco Dr
North End
213
34 9742
Slurry Seal
$3,953
2028
Bayside Dr
Marguerite Ave
Carnation Ave
2,415
37 74855
Slurry Seal
$30,372
2028
Bayside Dr
Coast Highway East
End
1,187
38 45106
Slurry Seal
$18,302
2028
Bayview Dr
Ocean Blvd
Goldenrod Ave
157
28 4396
Slurry Seal
$1,784
2028
Bayview Dr
lGoldenrod Ave
I Heliotrope Ave
251
28 7028
Slurry Seal
$2,852
2028
Bayview Dr
Heliotrope Ave
Iris Ave
260
28 7280
Slurry Seal
$2,954
2028
Beacon Bay
lHarbor Island Rd
jEnd
1,170
24 1 28080
1 Slurry Seal
1 $11,393
2028
6-69
Appendix A - Local Streets

Page 13 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Beacon St
Westminster Ave
Holmwood Dr
240
34 8160
Slurry Seal
$3,311
2028
Beacon St
La Jolla Dr
Santa Ana Ave
105
33 3465
Slurry Seal
$1,406
2028
Bedford Ln
Rutland Rd
Buckingham Ln
641
36 23076
Slurry Seal
$9,363
2028
Begonia Ave
Pacific Dr
Coast Highway East
1,885
28 52780
Slurry Seal
$21,415
2028
Birch St
Mesa Dr
End
232
36 9552
Slurry Seal
$3,876
2028
Bonaire Way
Holiday Rd
South End
235
33 10255
1 Slurry Seal
$4,161
2028
Bonaire Way
Francisco Dr
North End
225
33 7425
Slurry Seal
$3,013
2028
Braemar Way
Francisco Dr
End
215
34 9810
Slurry Seal
$3,980
2028
Breakers Dr
Breakers Dr
End
1,035
25 25875
Slurry Seal
$10,499
2028
Brighton Rd
Cameo Shores Rd
Camden Dr
1,390
33 48370
Slurry Seal
$19,626
2028
Buck Gully Dr
Sandcastle Dr
End
126
36 5786
Slurry Seal
$2,348
2028
Buckingham Ln
Westcliff Dr
Cornwall Ln
620
36 22320
Slurry Seal
$9,056
2028
Buttonshell Ln
Holiday Rd
Nautilus Ln
410
33 14130
Slurry Seal
$5,733
2028
Camden Dr
Cameo Shores Rd
Milford Dr
1,345
33 44385
1 Slurry Seal
$18,009
2028
Cameo Shores Rd
Coast Highway East
Orrington Rd
1,088
37 37777
Slurry Seal
$15,328
2028
Cameo Shores Rd
Orrington Rd
Brighton Rd
956
37 35372
Slurry Seal
$14,352
2028
Candlestick Ln
Glenwood Ln
Sandalwood Ln
630
35 23250
Slurry Seal
$9,434
2028
Castaways Ln
Dover Dr
Castaways (private) North
462
54 24948
Slurry Seal
$10,123
2028
Centella PI
Holiday Rd
South End
369
33 12177
Slurry Seal
$4,941
2028
Centella PI
Santiago Dr
North End
265
37 12305
Slurry Seal
$4,993
2028
Commodore Rd
Tradewinds Ln
Mariners Dr
1,950
38 75300
Slurry Seal
$30,553
2028
Constellation Dr
Santiago Dr
End
135
38 5130
1 Slurry Seal
$2,081
2028
Court Ave
20th St
McFadden PI
85 28
2380
Slurry Seal
$966
2028
Crown Dr North
Crown Dr
San Joaquin Hills Rd
1,370
36 49320
Slurry Seal
$20,012
2028
Cumberland Ln
Sussex Ln
Dover Dr
435
34 15390
Slurry Seal
$6,244
2028
Cutter Rd
Beacon Bay
End
380
24 9120
Slurry Seal
$3,700
2028
Dahlia Ave
Ocean Blvd
Seaview Ave
275
27 7425
Slurry Seal
$3,013
2028
Dahlia Ave
200' S of First St
Coast Highway East
1,490
27 40230
Slurry Seal
$16,323
2028
Deborah Ln
Mariners Dr
Vivian Ln
243
34 8262
Slurry Seal
$3,352
2028
Deborah Ln
Vivian Ln
Sylvia Ln
633
34 22122
1 Slurry Seal
$8,976
2028
Diana Ln
Priscilla Ln
Vivian Ln
762
34 27108
Slurry Seal
$10,999
2028
Donnie Rd
22nd St
End
540
33 20320
Slurry Seal
$8,245
2028
Dorothy Ln
Mariners Dr
Estelle Ln
238
33 7854
Slurry Seal
$3,187
2028
Dover Dr
End
Leila Ln
492
29 15768
Slurry Seal
$6,398
2028
Dover Dr
Leila Ln
Mariners Dr
500
29 14500
Slurry Seal
$5,883
2028
Dover Dr
Mariners Dr
Doris Ln
510
29 14790
Slurry Seal
$6,001
2028
Dover Dr
Doris Ln
Nottingham Rd
590
29 17110
Slurry Seal
$6,942
2028
Dover Dr
Nottingham Rd
Norfolk Ln
665
29 19285
Slurry Seal
$7,825
2028
Dover Dr
Norfolk Ln
Westcliff Dr
490
29 14210
Slurry Seal
$5,766
2028
Dover Dr
Westcliff Dr
Dover Dr (Arterial)
170
36 5460
Slurry Seal
$2,215
2028
Essex Ln
Cambridge Ln
Oxford Ln
836
34 28424
Slurry Seal
$11,533
2028
Eton PI
Dover Dr
End
163
33 7879
Slurry Seal
$3,197
2028
Evening Star Ln
Polaris Dr
End
980
33 34840
Slurry Seal
$14,136
2028
Fairfield Dr
Cameo Shores Rd
Milford Dr
1,355
33 44715
Slurry Seal
$18,143
2028
Fernleaf Ave
Seaview Ave
150' N Seaview Ave
150
27 4050
Slurry Seal
$1,643
2028
Fernleaf Ave
250' S of First St
Coast Highway East
1,260
27 34020
1 Slurry Seal
$13,804
2028
First Ave
Carnation Ave
Dahlia Ave
271
27 7317
Slurry Seal
$2,969
2028
First Ave
Dahlia Ave
Fernleaf Ave
270
27 7290
Slurry Seal
$2,958
2028
First Ave
Fernleaf Ave
Goldenrod Ave
270
27 7290
Slurry Seal
$2,958
2028
First Ave
Goldenrod Ave
Heliotrope Ave
270
27 7290
Slurry Seal
$2,958
2028
6- 70
Appendix A - Local Streets

Page 14 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
First Ave
Iris Ave
Jasmine Ave
270
27 7290
Slurry Seal
$2,958
2028
Ford Rd EB
West End
San Miguel Dr
840
30 26900
Slurry Seal
$10,915
2028
Ford Rd WB
Newport Hills Dr
West End
877
29 25433
Slurry Seal
$10,319
2028
Fourth Ave
Avocado Ave
Acacia Ave
265
27 7155
Slurry Seal
$2,903
2028
Fourth Ave
Acacia Ave
Begonia Ave
267
27 7209
1 Slurry Seal
$2,925
2028
Fourth Ave
Begonia Ave
Carnation Ave
265
27 7155
Slurry Seal
$2,903
2028
Fourth Ave
Carnation Ave
Dahlia Ave
265
27 7155
Slurry Seal
$2,903
2028
Francisco Dr
Irvine Ave
Tradewinds Ln
236
36 8496
Slurry Seal
$3,447
2028
Glenwood Ln
Candlestick Ln
Ashford Ln
640
33 22320
Slurry Seal
$9,056
2028
Goldenrod Ave
150' S of Seaview Ave
Seaview Ave
150
28 4200
Slurry Seal
$1,704
2028
Goldenrod Ave
End
Coast Highway East
1,124
28 31472
Slurry Seal
$12,770
2028
Gorham Dr
Cameo Shores Rd
Milford Dr
1,400
33 46200
1 Slurry Seal
$18,746
2028
Hampden Rd
Milford Dr
Cameo Shores Rd
930
37 34410
Slurry Seal
$13,962
2028
Hampden Rd
Cameo Shores Rd
End
213
37 8131
Slurry Seal
$3,299
2028
Hampshire Cir
Antigua Way
Antigua Way
751
34 25534
Slurry Seal
$10,360
2028
Hampshire Ct
Hampshire Cir
End
134
50 9200
Slurry Seal
$3,733
2028
Hampshire Ln
Lincoln Ln
Santiago Dr
250
34 8500
Slurry Seal
$3,449
2028
Hampshire Ln
Santiago Dr
Antigua Way
250
34 8500
Slurry Seal
$3,449
2028
Harbor Island Dr
Bayside Dr
Harbor Island Rd
750
43 34250
Slurry Seal
$13,897
2028
Harbor Island Dr
Harbor Island Rd
E End
1,862
37 68894
Slurry Seal
$27,954
2028
Harbor Island Dr
Harbor Island Dr
N End
190
36 6840
Slurry Seal
$2,775
2028
Hazel Dr
Coast Highway East
577' N of Coast Highway East
577
30 17310
Slurry Seal
$7,024
2028
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
393
29 11397
Slurry Seal
$4,624
2028
Heather Ln
Irvine Ave
End
955
34 36390
Slurry Seal
$14,765
2028
Heliotrope Ave
Ocean Blvd
Bayview Dr
400
27 10800
Slurry Seal
$4,382
2028
Heliotrope Ave
Seaview Ave
End
314
27 8478
1 Slurry Seal
$3,440
2028
Heliotrope Ave
Bayside Dr
Coast Highway East
1,015
28 28420
Slurry Seal
$11,531
2028
Highland Dr
Westcliff Dr
Nottingham Rd
1,592
38 60496
Slurry Seal
$24,546
2028
Highland Dr
Nottingham Rd
Mariners Dr
1,858
38 70604
Slurry Seal
$28,648
2028
Holiday Rd
Galaxy Dr
Santiago Dr
165
38 6270
Slurry Seal
$2,544
2028
Hospital Rd
Superior Ave
Placentia Ave
976
44 42944
Slurry Seal
$17,424
2028
Indian Spring Ln
Irvine Ave
End
78 52
6556
Slurry Seal
$2,660
2028
Iris Ave
Ocean Blvd
Seaview Ave
625
28 17500
Slurry Seal
$7,101
2028
Iris Ave
Seaview Ave
North End
320
28 8960
Slurry Seal
$3,636
2028
Island Ave
Bay Ave East
Balboa Blvd West
164
33 5412
Slurry Seal
$2,196
2028
Jasmine Ave
88' N of Ocean Blvd
Seaview Ave
432
28 12096
Slurry Seal
$4,908
2028
Jasmine Ave
Seaview Ave
North End
283
27 7641
Slurry Seal
$3,100
2028
Jasmine Ave
Bayside Dr
Coast Highway East
480
28 13440
Slurry Seal
$5,453
2028
Kathleen Ln
Teresita Ln
Beryl Ln
255
34 9270
Slurry Seal
$3,761
2028
Kathleen Ln
Beryl Ln
Highland Dr
260
34 8840
1 Slurry Seal
$3,587
2028
Ketch Rd
Beacon Bay
End
310
24 7440
Slurry Seal
$3,019
2028
Larkspur Ave
Ocean Blvd
Seaview Ave
470
28 13160
Slurry Seal
$5,340
2028
Larkspur Ave
Seaview Ave
North End
360
28 10080
Slurry Seal
$4,090
2028
Leila Lane
Dover Dr (Cul-de-Sac)
Diana Ln
240
33 7920
Slurry Seal
$3,214
2028
Linda Ln
Irvine Ave
Priscilla Ave
234
34 7956
Slurry Seal
$3,228
2028
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
721
36 26406
Slurry Seal
$10,714
2028
Marian Ln
Lincoln Ln
Highland Dr
279
38 11202
Slurry Seal
$4,545
2028
Mariners Dr
I Irvine Ave
overDr
1,450
38 55100
Slurry Seal
$22,357
2028
Mariners Dr
Santiago Dr
East End
1,232
37 48084
Slurry Seal
$19,510
2028
Marlin Way
IShipway Ln
ITerrapin Way
725
1 33
1 25725
1 Slurry Seal
$10,438
2028
6-71
Appendix A - Local Streets

Page 15 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
Pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Mesa View North
Ford Rd
Bonita Canyon Dr
400
43 17200
Slurry Seal
$6,979
2028
Milford Dr
Orrington Rd
Camden Dr
801
37 32137
Slurry Seal
$13,040
2028
Morning Star Ln
Polaris Dr
End
675
33 24775
Slurry Seal
$10,052
2028
Narcissus Ave
Ocean Blvd
Seaview Ave
366
27 9882
Slurry Seal
$4,010
2028
Narcissus Ave
Seaview Ave
Coast Highway East
5S3
27 14931
Slurry Seal
$6,058
2028
Nautilus Lane
Toyon Ln
Buttonshell Ln
320
33 11760
1 Slurry Seal
$4,772
2028
Newport Hills Dr E
Port Ramsgate PI
Port Seabourne Way
1,550
37 57350
Slurry Seal
$23,270
2028
Norfolk Ln
Dover Dr
Devon Ln
220
33 7260
Slurry Seal
$2,946
2028
North Star Ln
White Cliffs Dr
End
850
33 30550
Slurry Seal
$12,396
2028
Orchid Ave
Ocean Blvd
Coast Highway East
1,106
27 29862
Slurry Seal
$12,116
2028
Orrington Rd
Cameo Shores Rd
Milford Dr
1,425
33 47025
Slurry Seal
$19,080
2028
Pescador Dr
Nottingham Rd
Santiago Dr
1,487
33 50271
Slurry Seal
$20,397
2028
Piazza Lido
Via Florence
Via Havre
510
58 29580
Slurry Seal
$12,002
2028
Piazza Lido
Via Havre
Via Koron
428
24 10272
Slurry Seal
$4,168
2028
Poinsettia Ave
Ocean Blvd
Seaview Ave
547
28 15316
Slurry Seal
$6,214
2028
Poinsettia Ave
Seaview Ave
Coast Highway East
638
28 17864
Slurry Seal
$7,248
2028
Point Conception Way
El Capitan Dr
Drakes Bay Dr
168
36 6798
Slurry Seal
$2,758
2028
Poppy Ave
190'S Coast Highway East
Coast Highway East
190
21 3990
Slurry Seal
$1,619
2028
Pork Barrel Way (35th 1/2 St)
Finley Ave
S End
80 16
1280
Slurry Seal
$519
2028
Port Albans Cir
Newport Hills Dr East
End
175
54 9450
Slurry Seal
$3,834
2028
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
620
32 19840
Slurry Seal
$8,050
2028
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
958
32 30656
Slurry Seal
$12,439
2028
Port Ramsey PI
San Miguel Dr
Port Whitby PI
153
36 6008
Slurry Seal
$2,438
2028
Port Ramsgate PI
Newport Hills Drive East
Port Chelsea PI (East End)
430
32 13760
Slurry Seal
$5,583
2028
Port Stanhope Cir
Newport Hills Dr West
End
115
38 5330
Slurry Seal
$2,163
2028
Port Tiffin Cir
Newport Hills Dr West
End
115
54 6210
Slurry Seal
$2,520
2028
Port Whitby PI
Port Ramsey PI
Port Durness PI
1,020
36 37220
Slurry Seal
$15,102
2028
Prairie Road NB
Ford Rd
Bonita Canyon Dr
350
46 16100
Slurry Seal
$6,533
2028
Prairie Road SB
Bonita Canyon Dr
Ford Rd
350
35 12250
Slurry Seal
$4,970
2028
Priscilla Ln
Beryl Ln
Diana Ln
658
34 23572
Slurry Seal
$9,564
2028
Sandalwood Ln
Santiago Dr
Candlestick Ln
402
35 14670
Slurry Seal
$5,952
2028
Santa Isabel Ave
Irvine Ave
Tustin Ave
290
56 16240
1 Slurry Seal
$6,589
2028
Santiago Dr
Tustin Ave
Irvine Ave
1,275
37 48375
Slurry Seal
$19,628
2028
Schooner Rd
Beacon Bay
End
290
24 6960
Slurry Seal
$2,824
2028
Second Ave
Carnation Ave
Heliotrope Ave
1,200
28 33600
Slurry Seal
$13,633
2028
Shipway Ln
Tradewinds Ln
Skylark Ln
782
38 29716
Slurry Seal
$12,057
2028
Skylark Ln
Highland Dr
Commodore Rd
245
37 9065
Slurry Seal
$3,678
2028
Skylark Ln
Commodore Rd
Holiday Rd
1,088
38 41344
Slurry Seal
$16,775
2028
Somerset Ln
Highland Dr
Highland Dr
1,445
34 50330
Slurry Seal
$20,421
2028
Starlight Cir
Commodore Rd
Glenwood Ln
233
35 8155
1 Slurry Seal
$3,309
2028
Starlight Cir
Glenwood Ln
End
195
33 8935
Slurry Seal
$3,625
2028
Sylvia Ln
Beryl Ln
Deborah Ln
462
34 16308
Slurry Seal
$6,617
2028
Third Ave
Avocado Ave
Acacia Ave
270
27 7290
Slurry Seal
$2,958
2028
Third Ave
Acacia Ave
Begonia Ave
265
27 7155
Slurry Seal
$2,903
2028
Third Ave
Begonia Ave
Carnation Ave
265
27 7155
Slurry Seal
$2,903
2028
Third Ave
Dahlia Ave
Fernleaf Ave
265
27 7155
Slurry Seal
$2,903
2028
Toyon Ln
Holiday Rd
Nautilus Ln
445
33 15285
Slurry Seal
$6,202
2028
Tradewinds Ln
ntiago Dr
Commodore Rd
2,275
38 86450
Slurry Seal
$35,077
2028
Tremont Ln
Cameo Shores Rd
Milford Dr
1,420Sa
33 46860
Slurry Seal
$19,0,3
2628
Via Marina
ITustin Ave
jEnd
486
1 33
1 18538
1 Slurry Seal
1 $7,522
1 2028
6-72
Appendix A - Local Streets

Page 16 of 18 ends

Appendix A 110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of work
Length of Segment
Width of Segment
pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Via Oporto
Via Lido
Central Ave
600
29 17400
Slurry Seal
$7,060
2028
Vivian Ln
Beryl Ln
Diana Ln
794
34 28196
Slurry Seal
$11,441
2028
West Wind Way
Polaris Dr
End
822
34 29448
Slurry Seal
$11,949
2028
White Cliffs Dr
Polaris Dr
North Star Ln
224
38 8400
Slurry Seal
$3,408
2028
Windward Ln
Tradewinds Ln
Leeward Ln
1,420
33 48060
Slurry Seal
$19,500
2028
Yawl Rd
Beacon Bay
End
250
24 6000
1 Slurry Seal
$2,434
2028
Carnation Ave
First Ave
Coast Highway East
1,425
27 38475
Mill and Overlay
$643,156
2029
Zahma Dr
Kewamee Dr
Chubasco Dr
530
37 19610
Mill and Overlay
$327,805
2029
Cherry Tree Ln
Redland Dr
End
200
34 6800
Mill and Overlay
$113,670
2029
Patrice Rd
Flagship Rd
South End
315
37 11655
Mill and Overlay
$194,827
2029
Polaris Dr
Galaxy Dr
Evening Star Ln
1,232
36 44352
Mill and Overlay
$741,397
2029
Redlands Dr
South End
23rd St
203
33 6699
Mill and Overlay
$111,982
2029
Santiago Dr
Nottingham Rd
Pescador Dr
1,445
36 52020
Mill and Overlay
$869,577
2029
Twin Lakes Cir
Carmel Bay Dr
End
162
32 6684
1 Mill and Overlay
$111,731
2029
38th St
East End of Bridge
Lake Ave
113
19 2147
Reconstruction
$3,087
2029
D St
North End
Balboa Blvd East
75 20
1500
Reconstruction
$50,150
2029
Alba St
Eastbluff Or
Aralia St
137
36 4932
Slurry Seal
$2,061
2029
Alta Vista Dr
Carob St
Bison Ave
2,220
36 79920
Slurry Seal
$33,400
2029
Azure Ave
Orchid St
Bay View Ave
630
35 22050
Slurry Seal
$9,215
2029
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
1,110
61 67710
Slurry Seal
$28,297
2029
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
1,225
48 58800
Slurry Seal
$24,574
2029
Bay Farm PI
Upper Bay Or
End
425
34 14450
1 Slurry Seal
$6,039
2029
Bayview Way EB
Bayview PI
Jamboree Rd
587
33 21371
Slurry Seal
$8,931
2029
Bayview Way WB
Jamboree Rd
Bayview PI
617
32 19744
Slurry Seal
$8,251
2029
Bowsprit Dr
MacArthur Blvd
Dove St
306
44 13464
Slurry Seal
$5,627
2029
Camelback St
Jamboree Rd
La Felicidad
1,505
40 60825
Slurry Seal
$25,420
2029
Cercis PI
Alta Vista Dr
End
220
32 7040
Slurry Seal
$2,942
2029
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
1,320
36 47520
Slurry Seal
$19,860
2029
Cypress St (S/A Heights)
Orchard Dr
Cul De Sac
980
36 35280
Slurry Seal
$14,744
2029
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
260
36 9360
1 Slurry Seal
$3,912
2029
Dolphin -Striker Way
Dove St
End
335
44 16740
Slurry Seal
$6,996
2029
Dove St
Campus Dr
Birch St
585
37 21645
Slurry Seal
$9,046
2029
Indus St
Kline Dr
West End
800
33 28400
Slurry Seal
$11,869
2029
Kline Dr
Pegasus St
North End
570
33 21060
Slurry Seal
$8,801
2029
La Felicidad
Camelback St
La Salud
300
44 13200
Slurry Seal
$5,517
2029
La Salud
North End
La Vida
499
44 23956
Slurry Seal
$10,012
2029
La Salud
La Vida
Corsica Dr N
1,335
44 58740
Slurry Seal
$24,549
2029
La Salud
Corsica Dr N
La Felicidad
1,005
44 44220
1 Slurry Seal
$18,481
2029
Marine Ave
South Bridge End
North Bridge End
400
20 8000
Slurry Seal
$3,343
2029
Marine Ave
North Bridge End
Bayside Or
300
20 10800
Slurry Seal
$4,514
2029
Martingale Way
Corinthian Way
End
562
44 26228
Slurry Seal
$10,961
2029
Mesa Dr
Mesa Dr/Birch St
Cypress St
1,140
37 42180
Slurry Seal
$17,628
2029
Mesa Dr
Cypress St
End
1,345
37 49765
Slurry Seal
$20,798
2029
Orchard Or
Irvine Ave
Birch St
800
40 32000
Slurry Seal
$13,373
2029
Orchard Or
Birch St
Cypress St
630
36 22680
Slurry Seal
$9,478
2029
Orchard Or
Cypress St
Orchid St
465
35 16275
1 Slurry Seal
$6,802
2029
Orchard Or
Bay View Ave
End
148
35 5180
Slurry Seal
$2,165
2029
Orchid Hill PI
Upper Bay Dr
End
425
34 14450
Slurry Seal
$6,039
2029
Orchid St
Zenith Ave
Orchard Dr
957
35 33495
Slurry Seal
1 $13,998
1 2029
Orchid St
jOrchard Or
Azure Ave
500
1 35
17500
Slurry Seal
1 $7,314
1 2029
6- 73
Appendix A - Local Streets

Page 17 of 18 ends

Appendix A 1110000„I '
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level %I FV I V

PAVEMENT

ENGINEERING
Local Streets
Street Name
Limits of Work
Length of Segment
Width of Segment
pavement Area
(SF)
Type of Treatment
Cost of
Treatment
Year of
Treatment
From
To
Redlands Dr
Orchard Dr
Indus St
565
33 18645
Slurry Seal
$7,792
2029
Riverside Dr
Indus St
End
210
33 8430
Slurry Seal
$3,523
2029
Scott Dr
Corinthian Way
Dove St
513
44 22572
Slurry Seal
$9,433
2029
Spruce St
Bristol St North
Quail St
600
60 36000
Slurry Seal
$15,045
2029
Upper Bay Dr
Mesa Dr
Orchid Hill PI
1 527
36 18972
Slurry Seal
$7,929
2029
Vista Del Oro
Vista Nobleza
Vista Umbrosa
1,880
35 65800
Slurry Seal
$27,499
2029
Westerly PI
Dove St
Quail St
1,406
44 61864
Slurry Seal
$25,854
2029
Zenith Ave
Bayview Ave
Spruce Ave
283
35 9905
Slurry Seal
$4,140
2029
6-74
Appendix A - Local Streets

Page 18 of 18 ends

MPavement Management Plan Agency Submittal
OCTA
XII. Appendix B — Complete Listing of Current Street Conditions A complete listing of current pavement conditions should be included in this report. Specific data to be submitted should follow the format below:

M PAH
Street Name
From
To
Width of Segment
Area
Current PCI
Most Recent
Inspection Date
LOCAL
Street Name
From
To
Width of Segment
Area
Current PCI
Most Recent
Inspection Date
Please attach the complete street listing, following the above template, after this sheet. The pages should be labeled Appendix B.

Page 1 ends

6-75

Appendix B
Complete Street Listing Current Conditions
V1�IV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
16th St
City Limit
Sea Gull Ln
60 89,380
61 12/5/2022
16th St
Sea Gull Ln
Dover Dr
38 17,100
95 12/5/2022
32nd St
Villa Way
Newport Blvd
62 29,150
94 12/5/2022
32nd St
Lafayette Ave
Villa Way
48 24,564
95 12/5/2022
32nd St EB
Balboa Blvd
Newport Blvd
32 22,080
46 12/5/2022
32nd St WB
Newport Blvd
Balboa Blvd
32 22,080
70 12/6/2022
Adams St
Ocean Front Alley East
Ocean Front East
15 1,395
89 2/21/2023
Adams St
Ocean Front Alley East
Ocean Front East
15 1,395
92 2/21/2023
Avocado Ave
Farralon Dr
San Miguel Dr
66 57,552
85 11/22/2022
Avocado Ave
Coast Highway East
Farralon Or
64 120,360
93 11/22/2022
Balboa Blvd E EB
Island Ave
Medina Way
44 21,910
95 11/16/2022
Balboa Blvd E EB
Adams St
Main St
22 17,006
70 12/5/2022
Balboa Blvd E EB
Medina Way
Adams St
28 26,696
71 12/5/2022
Balboa Blvd E WB
Medina Way
Island Ave
40 20,800
95 11/16/2022
Balboa Blvd E WB
Adams St
Coronado Ave
28 17,640
62 12/5/2022
Balboa Blvd E WB
Coronado St
Medina Way
28 9,240
62 12/5/2022
Balboa Blvd E WB
Palm St
Adams St
22 5,500
65 12/5/2022
Balboa Blvd E WB
Main St
Washington St
22 5,610
76 12/5/2022
Balboa Blvd E WB
Washington St
Palm St
30 7,920
86 12/9/2022
Balboa Blvd NB
34th St
36th St
34 15,640
44 11/16/2022
Balboa Blvd NB
32nd St
34th St
34 16,592
46 11/16/2022
Balboa Blvd NB
23rd St
25th St
35 11,600
67 11/16/2022
Balboa Blvd NB
25th St
27th St
35 12,600
68 11/16/2022
Balboa Blvd NB
29th St
32nd St
35 25,875
69 11/16/2022
Balboa Blvd NB
27th St
29th St
35 17,850
70 11/16/2022
Balboa Blvd NB
110' N of 39th St
42nd St
40 22,100
70 11/16/2022
Balboa Blvd NB
36th St
110' N of 39th St
34 28,200
72 11/16/2022
Balboa Blvd NB
42nd St
44th St
40 16,800
73 11/16/2022
Balboa Blvd NB
44th St
Coast Highway
35 28,700
86 11/16/2022
Balboa Blvd SB
41stSt
38th St
24 17,330
59 11/16/2022
Balboa Blvd SB
36th St
34th St
24 11,982
60 11/16/2022
Balboa Blvd SB
44th St
41st St
24 15,870
61 11/16/2022
Balboa Blvd SB
29th St
27th St
35 17,850
61 11/16/2022
Balboa Blvd SB
32nd St
29th St
35 24,675
64 11/16/2022
Balboa Blvd SB
38th St
36th St
24 11,040
65 11/16/2022
Balboa Blvd SB
27th St
25th St
35 12,600
69 11/16/2022
Balboa Blvd SB
25th St
23rd St
35 14,000
69 12/13/2022
Balboa Blvd SB
34th St
32nd St
24 12,712
71 11/16/2022
Balboa Blvd SB
46th St
44th St
35 16,205
75 11/16/2022
Balboa Blvd SB
Coast Highway
46th St
35 14,595
85 11/16/2022
Balboa Blvd W EB
22nd St
McFadden PI
48 21,360
41 12/5/2022
Balboa Blvd W EB
14th St
12th St
24 21,120
54 11/16/2022
Balboa Blvd W EB
23rd St
22nd St
29 8,700
67 12/5/2022
Balboa Blvd W EB
McFadden PI
16th St
39 73,320
1 70
12/5/2022
Balboa Blvd W EB
16th St
14th St
24 22,824
88 11/16/2022
Balboa Blvd W EB
16th St
14th St
18 17,100
91 2/21/2023
Balboa Blvd W EB
14th St
12th St
18 15,840
91 2/21/2023
6-76
Appendix B - MPAH

Page 1 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Balboa Blvd W EB
12th St
8th St
50 89,000
95 11/16/2022
Balboa Blvd W EB
8th St
6th St
42 36,506
95 11/16/2022
Balboa Blvd W EB
6th St
Island Ave
42 18,400
95 11/16/2022
Balboa Blvd W WB
12th St
14th St
24 21,120
47 11/16/2022
Balboa Blvd W WB
16th St
21st St
38 69,940
71 11/16/2022
Balboa Blvd W WB
21st St
23rd St
42 21,000
82 11/16/2022
Balboa Blvd W WB
14th St
16th St
24 22,824
87 11/16/2022
Balboa Blvd W WB
14th St
16th St
18 17,100
90 2/21/2023
Balboa Blvd W WB
12th St
14th St
18 15,840
92 2/21/2023
Balboa Blvd W WB
Island Ave
6th St
40 15,100
95 11/16/2022
Balboa Blvd W WB
6th St
8th St
40 34,800
95 11/16/2022
Balboa Blvd W WB
8th St
12th St
40 70,600
95 11/16/2022
Bayside Dr
Jamboree Rd
Coast Highway East
60 247,800
95 12/6/2022
Birch St
Von Karman Ave
MacArthur Blvd
56 74,960
59 12/6/2022
Birch St
Jamboree Rd
Von Karman Ave
60 114,000
69 12/6/2022
Birch St
MacArthur Blvd
Dove St
61 91,195
69 12/6/2022
Birch St
Orchard St
Mesa Dr
64 79,744
73 11/15/2022
Birch St
Dove St
Quail St
61 81,130
75 11/15/2022
Birch St
Quail St
Bristol St North
61 67,885
76 11/15/2022
Birch St
Bristol St South
Orchard St
64 90,130
77 11/15/2022
Bison Ave EB
Jamboree Rd
MacArthur Blvd
34 93,040
95 11/18/2022
Bison Ave EB
MacArthur Blvd
City limit
42 46,940
95 11/18/2022
Bison Ave WB
City Limit
MacArthur Blvd
42 48,340
95 11/18/2022
Bison Ave WB
MacArthur Blvd
Jamboree Rd
41 104,210
96 2/4/2021
Bonita Canyon Dr EB
MacArthur Blvd
Bridge
41 32,431
95 11/15/2022
Bonita Canyon Dr EB
Bridge
Mesa View Dr
30 35,000
95 11/15/2022
Bonita Canyon Dr EB
Mesa View Dr
Prarie Rd
30 49,950
95 11/15/2022
Bonita Canyon Dr EB
Prarie Rd
Bridge
42 34,440
95 11/15/2022
Bonita Canyon Dr EB
Bridge
Chambord
42 19,140
95 11/15/2022
Bonita Canyon Dr EB
Chambord
SR-73
42 44,310
95 11/15/2022
Bonita Canyon Dr WB
SR-73
Chambord
44 46,420
95 11/15/2022
Bonita Canyon Dr WB
Chambord
Bridge
33 13,200
95 11/15/2022
Bonita Canyon Dr WB
Bridge
Prarie Rd
33 32,555
95 11/15/2022
Bonita Canyon Dr WB
Prarie Rd
Mesa View Dr
30 52,950
95 11/15/2022
Bonita Canyon Dr WB
Mesa View Dr
Bridge
30 30,000
95 11/15/2022
Bonita Canyon Dr WB
Bridge
MacArthur Blvd
38 39,758
95 11/15/2022
Bristol St North
Spruce St
Birch St
46 72,856
48 11/21/2022
Bristol St North
Jamboree Rd
Dove St
46 26,036
62 11/21/2022
Bristol St North
Birch St
Campus Dr
51 36,967
63 11/21/2022
Bristol St North
Dove St
Spruce St
46 58,006
67 11/21/2022
Bristol St South
Birch St
Cypress St
50 31,550
50 11/21/2022
Bristol St South
Cypress St
Spruce Ave
34 31,350
52 11/21/2022
Bristol St South
Irvine Ave
Birch St
58 33,900
58 11/21/2022
Bristol St South
Bayview PI
Jamboree Rd
50 52,000
67 11/21/2022
Bristol St South
Spruce Ave
Bayview PI
50 42,750
90 11/21/2022
Campus Dr EB
IVon Karman Ave
Teller Ave
1 36
1 47,340
1 54
1 11/21/2022
Campus Dr EB
MacArthur Blvd
MacArthur Ct
40 20,400
80 11/29/2022
Campus Dr EB
ITeller Ave
Jamboree Rd
33 26,600
86 L--
11/21/2022
Campus Dr EB
I Dove St
Airport
42 81,300
1 94
11/21/2022
6-77
Appendix B - MPAH

Page 2 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Campus Dr EB
Airport
MacArthur Blvd
62 26,040
94 11/21/2022
Campus Dr EB
Bristol St North
Quail St
41 40,450
95 11/21/2022
Campus Dr EB
Quail St
Dove St
42 58,150
95 11/21/2022
Campus Dr EB
MacArthur Ct
Von Karman Ave
36 37,044
95 11/21/2022
Coast Highway E NB
Avocado Ave
Newport Center Dr
50 54,500
70 12/1/2022
Coast Highway E NB
Irvine Ter
Jamboree Rd
46 154,350
70 12/1/2022
Coast Highway E NB
Newport Center Dr
Irvine Ter
50 56,250
71 12/1/2022
Coast Highway E NB
MacArthur Blvd
Avocado Ave
50 39,500
75 12/1/2022
Coast Highway E NB
Newport Coast Dr
Cameo Highlands Dr
50 176,750
95 12/1/2022
Coast Highway E NB
Cameo Highlands Dr
Morning Canyon Rd
28 38,900
95 12/1/2022
Coast Highway E NB
Morning Canyon Rd
Poppy Ave
28 48,220
95 12/1/2022
Coast Highway E NB
Poppy Ave
Marguerite Ave
28 46,940
95 12/1/2022
Coast Highway E NB
Marguerite Ave
Goldenrod Ave
28 54,370
95 12/1/2022
Coast Highway E NB
Goldenrod Ave
MacArthur Blvd
28 35,057
95 12/1/2022
Coast Highway E SB
Irvine Ter
Newport Center Dr
46 55,600
47 12/1/2022
Coast Highway E SB
Avocado Ave
MacArthur Blvd
50 41,250
65 12/1/2022
Coast Highway E SB
Newport Center Dr
Avocado Ave
44 55,830
72 12/1/2022
Coast Highway E SB
Jamboree Rd
Irvine Ter
46 139,150
76 12/1/2022
Coast Highway E SB
MacArthur Blvd
Goldenrod Ave
28 35,442
95 12/1/2022
Coast Highway E SB
Goldenrod Ave
Marguerite Ave
28 58,170
95 12/1/2022
Coast Highway E SB
Marguerite Ave
Poppy Ave
28 47,190
95 12/1/2022
Coast Highway E SB
Morning Canyon Rd
Cameo Highlands Dr
30 41,750
95 12/1/2022
Coast Highway E SB
Cameo Highlands Dr
Newport Coast Dr
50 176,850
95 12/1/2022
Coast Highway E SB
Poppy Ave
Morning Canyon Rd
28 49,220
95 12/12/2022
Dover Dr NB
Coast Highway
Cliff Dr
39 40,823
92 11/18/2022
Dover Dr NB
Cliff Dr
Castaways Ln
30 39,080
1 95
11/18/2022
Dover Dr NB
Castaways Ln
Westcliff Dr
30 44,100
95 11/18/2022
Dover Dr NB
Westcliff Dr
Mariners Dr
37 96,795
93 12/5/2022
Dover Dr NB
Mariners Dr
Irvine Ave
37 34,854
95 12/5/2022
Dover Dr SB
Westcliff Dr
16th St
33 44,070
95 11/18/2022
Dover Dr SB
16th St
Cliff Dr
30 37,500
95 11/18/2022
Dover Dr SB
Cliff Dr
Coast Highway
41 52,549
95 11/18/2022
Eastbluff Dr NB
Vista Del Sol
Jamboree Rd/University Dr
30 120,000
55 12/13/2022
Eastbluff Dr NB
Jamboree Rd
Vista Del Sol
30 119,250
75 11/15/2022
Eastbluff Dr SB
Jamboree Rd/University Dr
Vista Del Sol
30 120,000
44 11/15/2022
Eastbluff Dr SB
Vista Del Sol
Jamboree Rd
30 119,250
55 11/15/2022
Ford Rd EB
Jamboree Rd
MacArthur Blvd
34 129,320
95 11/15/2022
Ford Rd EB
Newport Hills Dr
San Miguel Dr
29 79,047
73 12/2/2022
Ford Rd EB
San Miguel Dr
Hillside Dr
36 14,760
86 12/2/2022
Ford Rd WB
MacArthur Blvd
Jamboree Rd
34 127,840
95 12/15/2022
Ford Rd WB
San Miguel Dr
Newport Hills Dr
30 72,600
72 12/2/2022
Ford Rd WB
Hillside Dr
San Miguel Dr
32 12,960
90 12/2/2022
Hospital Rd
Placentia Ave
Newport Blvd
57 39,900
65 12/6/2022
Irvine Ave

BRISTOL ST

MESA DR
42 131,880
89 11/18/2022
Irvine Ave
Santa Isabel Ave
University Dr
28 96,800
90 11/18/2022
Irvine Ave
Mesa Dr
Bristol St South
42 129,900
93 11/18/2022
Irvine Ave
16th St
Mariners Dr
34 88,400
95 11/18/2022
Irvine Ave
I Mariners Dr
I Dover Dr
32 38,816
95 1 11/18/2022
Irvine Ave
I Dover Dr
I Linda Ln
34 21,930
95 1 11/18/2022
6-78
Appendix B - MPAH

Page 3 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Irvine Ave
Linda Ln
Baycrest Rd
34 36,890
95 11/18/2022
Irvine Ave
Baycrest Rd
Santiago Dr
38 82,460
95 11/18/2022
Irvine Ave
Santiago Dr
23rd St
77 103,606
95 11/18/2022
Irvine Ave
23rd St
Santa Isabel Ave
76 114,000
95 11/18/2022
Irvine Ave
Baycrest Rd
Francisco Dr
38 46,626
95 11/18/2022
Irvine Ave
Francisco Dr
Santiago Dr
38 37,658
95 11/18/2022
Irvine Ave
Santiago Dr
Francisco Dr
38 37,848
95 11/18/2022
Irvine Ave
Francisco Dr
Baycrest Rd
38 46,474
95 11/18/2022
Irvine Ave
300' S of Monte Vista Ave
Santa Isabel Ave
28 29,372
95 11/18/2022
Irvine Ave
Baycrest Rd
Santiago Dr
38 82,460
95 11/18/2022
Jamboree Rd
Bayside Dr
Coast Highway East
60 48,000
95 12/2/2022
Jamboree Rd NB
Bristol St North
MacArthur Blvd
46 39,380
71 12/1/2022
Jamboree Rd NB
Bayview Way
Bristol St South
57 58,935
77 11/16/2022
Jamboree Rd NB
University Dr/Eastbluff Dr
Bayview Way
57 83,439
88 11/14/2022
Jamboree Rd NB
Ford Rd
Bison Ave
46 152,424
91 11/14/2022
Jamboree Rd NB
Bison Ave
University Dr/Eastbluff Dr
46 144,680
94 11/14/2022
Jamboree Rd NB
Coast Highway East
Back Bay Dr
53 37,014
95 11/15/2022
Jamboree Rd NB
Back Bay Dr
Island Lagoon Dr/Hyatt Newporter
61 42,175
95 11/15/2022
Jamboree Rd NB
Island Lagoon Dr/Hyatt Newporter
Santa Barbara Dr
46 155,600
95 11/15/2022
Jamboree Rd NB
Santa Barbara Dr
San Joaquin Hills Rd
47 46,415
95 11/15/2022
Jamboree Rd NB
San Joaquin Hills Rd
Ford Rd
46 127,968
95 12/15/2022
Jamboree Rd SB
Campus Dr
Birch St
49 43,740
67 12/1/2022
Jamboree Rd SB
Koll Center
MacArthur Blvd
58 35,450
71 11/14/2022
Jamboree Rd SB
Birch St
Fairchild Rd
48 106,560
73 12/1/2022
Jamboree Rd SB
Bristol St South
Bayview Way
53 51,214
74 12/1/2022
Jamboree Rd SB
Bayview Way
University Dr/Eastbluff Dr
46 87,498
76 12/1/2022
Jamboree Rd SB
MacArthur Blvd
Bristol St North
46 38,824
81 11/15/2022
Jamboree Rd SB
Fairchild Rd
Koll Center
58 42,542
86 11/14/2022
Jamboree Rd SB
University Dr/Eastbluff Dr
Bison Ave
46 151,880
89 12/1/2022
Jamboree Rd SB
San Joaquin Hills Rd
Santa Barbara Dr
46 51,920
95 11/15/2022
Jamboree Rd SB
Santa Barbara Dr
Island Lagoon Dr/Hyatt Newporter
46 146,710
95 11/15/2022
Jamboree Rd SB
Island Lagoon Dr/Hyatt Newporter
Back Bay Dr
46 31,460
95 11/15/2022
Jamboree Rd SB
Back Bay Dr
Coast Highway East
45 53,350
95 11/15/2022
Jamboree Rd SB
Bison Ave
Ford Rd/Eastbluff Dr
46 154,430
95 12/1/2022
Jamboree Rd SB
Ford Rd/Eastbluff Dr
San Joaquin Hills Rd
46 128,450
95 12/15/2022
MacArthur Blvd NB
Jamboree Rd
Von Karman Ave
39 99,757
64 11/29/2022
MacArthur Blvd NB
Von Karman Ave
Birch St
60 146,940
68 11/21/2022
MacArthur Blvd NB
Birch St
Campus Dr
60 55,080
76 11/21/2022
MacArthur Blvd NB
Bonita Canyon Dr/Ford Rd
Villaggio
59 97,144
95 11/15/2022
MacArthur Blvd NB
Villaggio
Bison Ave
55 84,560
95 11/15/2022
MacArthur Blvd NB
Coast Highway East
San Miguel Dr
34 105,712
95 11/18/2022
MacArthur Blvd NB
San Miguel Dr
San Joaquin Hills Rd
46 74,798
95 11/18/2022
MacArthur Blvd NB
San Joaqin Hills Rd
3400' N of San Joaqin Hills Rd
44 151,350
95 11/18/2022
MacArthur Blvd NB
3400' N of San Joagin Hills Rd
Bonita Canyon Dr/Ford Rd
44 140,900
95 11/18/2022
MacArthur Blvd NB
Bison Ave
City Limit
46 54,470
95 11/18/2022
MacArthur Blvd SB
Newport Place Dr
Jamboree Rd
61 104,984
59 11/21/2022
MacArthur Blvd SB
1 Birch St
I Newport Place Dr
60 147,240
67 11/21/2022
MacArthur Blvd SB
Campus Dr
Birch St
61 81,960
68 11/21/2022
MacArthur Blvd SB
I City Limit
Bison Ave
60 75,450
95 11/18/2022
6- 79
Appendix B - MPAH

Page 4 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
MacArthur Blvd SB
Bison Ave
Vilaggio
55 74,060
95 11/18/2022
MacArthur Blvd SB
Villaggio
Bonita Canyon Dr
55 101,380
95 11/18/2022
MacArthur Blvd SB
Bonita Canyon Dr
2600' S Bonita Canyon Dr
46 125,600
95 11/18/2022
MacArthur Blvd SB
2600' S Bonita Canyon Dr
San Joaqin Hills Rd
46 171,400
95 11/18/2022
MacArthur Blvd SB
San Joaquin Hills Rd
San Miguel Dr
44 74,952
95 11/18/2022
MacArthur Blvd SB
San Miguel Dr
Coast Highway East
34 125,006
95 11/18/2022
Marguerite Ave
Harbor View Dr
Fifth Ave
55 84,810
95 11/23/2022
Marguerite Ave
Fifth Ave
Coast Hwy East
36 64,920
95 11/23/2022
Marguerite Ave
Harbor View Dr
Sausalito Dr
60 62,820
95 11/23/2022
Marguerite Ave
Sausalito Dr
San Joaquin Hills Rd
60 110,700
95 11/23/2022
Mesa Dr
Irvine Ave
Acacia St
66 90,090
84 11/15/2022
Mesa Dr
Acacia St
Mesa Dr/ Birch St
66 13,200
86 11/15/2022
Newport Blvd NB
23rd St
26th St
32 17,120
69 12/5/2022
Newport Blvd NB
Via Lido
Newport Channel Bridge
42 25,956
70 12/5/2022
Newport Blvd NB
28th St
30th St
38 25,460
71 2/21/2023
Newport Blvd NB
26th St
28th St
38 15,770
80 2/21/2023
Newport Blvd NB
21st St/Balboa Blvd West
23rd St
36 20,844
85 12/5/2022
Newport Blvd NB
Finley Ave
Via Lido
42 21,084
94 12/5/2022
Newport Blvd NB
32nd St
Finley Ave
52 20,880
95 12/5/2022
Newport Blvd NB
30th St
32nd St
35 17,780
95 12/5/2022
Newport Blvd SB
28th St
26th St
41 16,810
50 12/5/2022
Newport Blvd SB
Newport Channel Bridge
Via Lido
42 22,932
56 12/5/2022
Newport Blvd SB
23rd St
21st St/Balboa Blvd West
32 20,192
60 12/5/2022
Newport Blvd SB
30th St
28th St
41 26,568
71 12/5/2022
Newport Blvd SB
26th St
23rd St
32 17,280
88 12/5/2022
Newport Blvd SB
Finley Ave
32nd St
42 21,820
95 12/5/2022
Newport Blvd SB
32nd St
30th St
35 17,640
95 12/5/2022
Newport Blvd SB
Via Lido
Finley Ave
42 21,546
95 12/5/2022
Newport Center Dr E NB
Newport Center Dr
Anacapa Dr
36 28,644
74 12/8/2022
Newport Center Dr E NB
Santa Rosa Dr
Santa Cruz Dr
36 57,296
78 12/8/2022
Newport Center Dr E NB
Anacapa Dr
San Miguel Dr
36 31,630
85 12/8/2022
Newport Center Dr E NB
San Miguel Dr
Santa Rosa Dr
36 44,664
85 12/8/2022
Newport Center Dr E SB
Anacapa Dr
Newport Center Dr
36 29,144
56 12/8/2022
Newport Center Dr E SB
San Miguel Dr
Anacapa Dr
36 31,380
75 12/8/2022
Newport Center Dr E SB
Santa Rosa Dr
San Miguel Dr
36 43,360
84 12/8/2022
Newport Center Dr E SB
Santa Cruz Dr
Santa Rosa Dr
36 53,008
87 12/8/2022
Newport Center Dr NB
Coast Highway East
Farallon Dr/Granville Dr
36 46,304
60 12/8/2022
Newport Center Dr NB
Farallon Dr/Granville Dr
Newport Center Dr West
36 32,748
70 12/8/2022
Newport Center Dr SB
Newport Center Dr West
Farallon Dr/Granville Dr
36 37,020
57 12/8/2022
Newport Center Dr SB
Farallon Dr/Granville Dr
Coast Highway East
36 40,816
73 12/8/2022
Newport Center Dr W NB
Newport Center Dr
Santa Barbara Dr
36 53,548
61 12/8/2022
Newport Center Dr W NB
Santa Barbara Dr
Santa Cruz Dr
36 41,632
62 12/8/2022
Newport Center Dr W SB
Santa Cruz Dr
Santa Barbara Dr
36 40,018
56 12/8/2022
Newport Center Dr W SB
Santa Barbara Dr
Newport Center Dr
36 55,924
1 69
12/8/2022
Newport Coast Dr NB
Provence
Pelican Hill Rd N/Ocean Ridge Dr
41 200,473
66 11/23/2022
Newport Coast Dr NB
San Joaquin Hills Rd
Sage Hill
41 124,804
76 11/23/2022
Newport Coast Dr NB
Sage Hill
173 Freeway Bridge
42 93,870
77 11/23/2022
Newport Coast Dr NB
Pelican Hill Rd South
jProvence
41 66,321
78 11/23/2022
Newport Coast Dr NB
Pelican Hill Rd N/Ocean Ridge Dr
IVista Ridge Rd/Pacific Pine Dr
41 140,908
83 11/23/2022
6-80
Appendix B - MPAH

Page 5 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Newport Coast Dr NB
Vista Ridge Rd/Pacific Pine Dr
Ridge Park Rd
41 46,932
83 11/23/2022
Newport Coast Dr NB
Ridge Park Rd
San Joaquins Hills Rd
41 59,965
83 11/23/2022
Newport Coast Dr NB
Coast Highway East
Pelican Hill Rd South
41 80,809
85 11/23/2022
Newport Coast Dr SB
Sage Hill
San Joaquin Hills Rd
41 129,054
76 11/23/2022
Newport Coast Dr SB
Vista Ridge Rd/Pacific Pine Dr
Pelican Hill Rd N/Ocean Ridge Dr
41 143,408
77 11/23/2022
Newport Coast Dr SB
Pelican Hill Rd N/Ocean Ridge Dr
Provence
41 200,973
77 11/23/2022
Newport Coast Dr SB
Ridge Park Rd
Vista Ridge Rd/Pacific Pine Dr
41 47,182
78 11/23/2022
Newport Coast Dr SB
San Joaquin Hills Rd
Ridge Park Road
41 45,715
81 11/23/2022
Newport Coast Dr SB
Provence
Pelican Hill Rd South
41 70,821
87 11/23/2022
Newport Coast Dr SB
Pelican Hill Rd South
Coast Highway East
41 83,809
89 11/23/2022
Placentia Ave
Superior Ave
City Limits
62 79,050
80 12/6/2022
Placentia Ave
Hospital Rd
Superior Ave
40 32,400
83 12/6/2022
San Joaquin Hills Rd EB
San Miguel Dr
Crown Dr
41 39,212
62 11/22/2022
San Joaquin Hills Rd EB
Crown Dr
Marguerite Ave
41 65,993
64 11/29/2022
San Joaquin Hills Rd EB
Newport Ridge Dr West
Newport Ridge Dr East
33 77,670
74 11/22/2022
San Joaquin Hills Rd EB
Spyglass Hill Rd
Newport Ridge Dr West
33 152,385
84 11/22/2022
San Joaquin Hills Rd EB
MacArthur Blvd
San Miguel Dr
40 44,320
86 11/22/2022
San Joaquin Hills Rd EB
Newport Ridge Dr East
Newport Coast Dr
33 41,125
91 11/22/2022
San Joaquin Hills Rd EB
Marguerite Ave
Spyglass Hill Rd
41 116,841
94 11/22/2022
San Joaquin Hills Rd EB
Jamboree Rd
Santa Cruz Dr
40 61,900
95 11/22/2022
San Joaquin Hills Rd EB
Santa Cruz Dr
Santa Rosa Dr
40 88,650
95 11/22/2022
San Joaquin Hills Rd EB
Santa Rosa Dr
MacArthur Blvd
40 68,200
95 11/22/2022
San Joaquin Hills Rd WB
Newport Coast Dr
Newport Ridge Dr East
33 42,890
66 11/22/2022
San Joaquin Hills Rd WB
Crown Dr
San Miguel Dr
41 40,212
70 11/22/2022
San Joaquin Hills Rd WB
Newport Ridge Dr East
Newport Ridge Dr West
33 77,920
74 11/22/2022
San Joaquin Hills Rd WB
Marguerite Ave
Crown Dr
41 65,993
74 11/22/2022
San Joaquin Hills Rd WB
Newport Ridge Rd West
Spyglass Hill Rd
33 144,885
81 11/22/2022
San Joaquin Hills Rd WB
San Miguel Dr
MacArthur Blvd
41 41,565
86 11/22/2022
San Joaquin Hills Rd WB
Spyglass Hill Rd
Marguerite Ave
41 115,619
93 11/22/2022
San Joaquin Hills Rd WB
MacArthur Blvd
Santa Rosa Dr
40 70,360
95 11/22/2022
San Joaquin Hills Rd WB
Santa Rosa Dr
Santa Cruz Dr
40 92,200
95 11/22/2022
San Joaquin Hills Rd WB
Santa Cruz Dr
Jamboree Rd
40 63,240
95 11/22/2022
San Miguel Dr
Newport Center Dr East
Avocado Ave
72 68,216
51 12/6/2022
San Miguel Dr
Avocado Ave
MacArthur Blvd
92 28,520
56 12/6/2022
San Miguel Dr NB
Spyglass Hill Rd/Eastgate Dr
Ford Rd
29 70,294
37 11/15/2022
San Miguel Dr NB
Yacht Coquette (North End)
Spyglass Hill Rd/Eastgate Dr
29 45,326
49 11/30/2022
San Miguel Dr NB
San Joaquin Hills Rd
Pacific View Dr
29 19,665
64 11/30/2022
San Miguel Dr NB
Harbor Woods PI
Port Sutton Dr
29 53,319
1 73
11/30/2022
San Miguel Dr NB
Pacific View Dr
Harbor Woods PI
29 14,645
79 11/30/2022
San Miguel Dr NB
Port Sutton Dr
Yacht Coquette (North End)
29 32,190
80 11/30/2022
San Miguel Dr NB
MacArthur Blvd
San Joaquin Hills Rd
31 45,335
95 11/30/2022
San Miguel Dr SB
Ford Rd
Spyglass HillRd/Eastgate Dr
29 67,170
41 11/30/2022
San Miguel Dr SB
Spyglass Hill Rd/Eastgate Dr
Yacht Coquette (North Side)
29 43,326
42 11/30/2022
San Miguel Dr SB
Yacht Coquette (North Side)
Port Sutton Dr/Yacht Coquette (S)
29 33,940
47 11/30/2022
San Miguel Dr SB
Pacific View Dr
San Joaquin Hills Rd
29 22,915
75 11/30/2022
San Miguel Dr SB
Port Sutton Dr
Harbor Woods PI
29 51,069
81 11/30/2022
San Miguel Dr SB
Harbor Woods PI
Pacific View Dr
29 15,645
87 11/30/2022
San Miguel Dr SB
San Joaquin Hills Rd
MacArthur Blvd
30 41,200
93 11/30/2022
Santa Cruz Dr
San Joaquin Hills Rd
Newport Center Dr West
72 82,656
49 12/9/2022
6-81
Appendix B - MPAH

Page 6 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
MPAH
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Santa Rosa Dr
Newport Center Dr East
San Joaquin Hills Rd
72 39,600
87 12/9/2022
Spyglass Hill Rd
Ridgeline Dr
El Capitan Dr
44 56,144
47 12/2/2022
Spyglass Hill Rd
Harbor Ridge Dr
Ridgeline Dr
44 56,452
62 12/2/2022
Spyglass Hill Rd
San Miguel Dr
Harbor Ridge Dr
44 54,340
69 12/2/2022
Spyglass Hill Rd
El Capitan Dr
San Joaquin Hills Rd
44 84,480
72 12/2/2022
Superior Av NB
Coast Highway West
Ticonderga St
38 55,784
50 12/9/2022
Superior Av NB
Ticonderga St
Placentia Ave
38 56,734
58 12/9/2022
Superior Av NB
Placentia Ave
City Limit
38 66,500
89 12/7/2022
Superior Av SB
Placentia Av
Ticonderga St
38 58,976
46 12/9/2022
Superior Av SB
Ticonderga St
Coast Highway West
38 58,976
74 12/9/2022
Superior Av SB
City Limit
Placentia Av
38 63,080
80 12/9/2022
University Dr EB
Jamboree Rd
La Vida/Baypointe Dr
32 21,730
95 11/15/2022
University Dr EB
La Vida/Baypointe Dr
Bonita Creek Bridge
32 21,280
95 11/15/2022
University Dr EB
Bonita Creek Bridge
City Limit
44 34,320
95 11/15/2022
University Dr WB
City Limit
Bonita Creek Bridge
44 36,320
95 11/14/2022
University Dr WB
Bonita Creek Bridge
La Vida/Baypointe Dr
42 29,600
95 11/15/2022
University Dr WB
La Vida/Baypointe Dr
Jamboree Rd
42 30,130
95 11/15/2022
Via Lido
Bridge (West End)
Newport Blvd
26 40,300
76 12/9/2022
Via Lido
Newport Blvd
Bridge (West End)
26 40,300
78 12/6/2022
Von Karman Ave
Campus Dr
Birch St
1 76
1 56,952
59 12/6/2022
Von Karman Ave
Birch St
MacArthur Blvd
76 163,580
61 12/6/2022
Westcliff Dr EB
Irvine Ave
Dover Dr
25 42,575
93 12/5/2022
Westcliff Dr WB
Dover Dr
Irvine Ave
25 42,375
93 12/5/2022
6-82
Appendix B - MPAH

Page 7 of 7 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
06th St
Balboa Blvd West
Ocean Front West
34 5,168
90 1/26/2023
06th St
Bay Ave West
Balboa Blvd West
34 4,896
100
1/26/2023
07th St
Balboa Blvd West
Ocean Front West
34 5,100
83 1/26/2023
07th St
Bay Ave West
Balboa Blvd West
30 5,010
87 12/14/2022
08th St
Bay Ave West
Balboa Blvd West
33 5,280
79 1/26/2023
08th St
Balboa Blvd West
Ocean Front West
33 5,280
85 1/26/2023
09th St
Bay Ave West
Balboa Blvd West
27 4,995
80 12/14/2022
09th St
Balboa Blvd West
Ocean Front West
28 5,740
88 1/26/2023
09th St
North End
Bay Ave West
30 3,300
93 1/26/2023
loth St
Balboa Blvd West
Ocean Front West
27 6,129
85 1/26/2023
10th St
North End
Bay Ave West
26 936
95 12/14/2022
loth St
Bay Ave West
Balboa Blvd West
28 5,180
95 12/14/2022
11th St
Balboa Blvd West
Ocean Front West
28 6,440
77 1/26/2023
11th St
Bay Ave West
Balboa Blvd West
28 5,208
82 12/14/2022
11th St
North End
Bay Ave West
30 900
94 1/26/2023
12th St
Balboa Blvd West
Ocean Front West
28 6,440
81 1/26/2023
12th St
Bay Ave West
Balboa Blvd West
28 5,180
85 12/14/2022
12th St
North End
Bay Ave West
29 870
88 1/26/2023
13th St
Balboa Blvd West
Ocean Front West
28 6,720
79 1/26/2023
13th St
North End
Bay Ave West
30 900
81 1/26/2023
13th St
Bay Ave West
Balboa Blvd West
28 6,048
86 12/14/2022
14th St
North End
Bay Ave West
30 900
81 1/26/2023
14th St
Bay Ave West
Balboa Blvd West
30 6,450
81 1/26/2023
14th St
Balboa Blvd West
Ocean Front West
27 6,210
85 1/26/2023
15th St
Old Newport Ave
Bolsa Ave
18 12,420
77 12/19/2022
15th St
Santa Ana Ave
Redlands Ave
36 24,120
78 12/19/2022
15th St
North End
Balboa Blvd West
73 21,900
78 1/26/2023
15th St
Bolsa Ave
Santa Ana Ave
18 17,280
80 12/19/2022
15th St
Redlands Ave
Tustin Ave
18 12,060
80 12/19/2022
15th St
Balboa Blvd West
Ocean Front West
77 17,941
84 1/26/2023
15th St
Aliso Ave
Irvine Ave
36 23,760
85 12/19/2022
15th St
Tustin Ave
Aliso Ave
36 23,760
86 12/19/2022
15th St
Irvine Ave
St Andrew Rd
62 33,720
91 12/19/2022
15th St
St Andrew Rd
Kings PI
35 41,300
92 12/21/2022
15th St
Kings PI
St James PI
35 7,350
93 12/21/2022
15th St W
Placentia Ave
Superior Ave
60 12,900
50 12/19/2022
15th St W
Monrovia Ave
Placentia Ave
36 46,224
79 12/19/2022
16th St
Balboa Blvd West
Ocean Front West
27 6,075
86 1/26/2023
16th St W
West End
Placentia Ave
36 86,400
64 12/20/2022
17th St
Balboa Blvd West
Ocean Front West
28 6,300
81 1/26/2023
18th St
Balboa Blvd West
Ocean Front West
28 6,356
79 1/26/2023
18th St
North End
Balboa Blvd West
28 8,400
91 12/14/2022
19th St
Balboa Blvd
Sundance Dr
30 27,900
76 12/20/2022
19th St
Balboa Blvd West
Ocean Front West
30 8,100
76 1/26/2023
19th St
North End
Balboa Blvd West
28 12,040
89 12/14/2022
20th St
91' S of North End
Balboa Blvd West
34 11,050
55 1/26/2023
20th St
North End
91' S of North End
34 3,094
89 12/14/2022
6-83
Appendix B - Local Streets

Page 1 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
20th St
Balboa Blvd West
Ocean Front West
33 11,418
93 1/26/2023
21st St
Balboa Blvd West N/s
South End
24 10,608
83 12/14/2022
21st St
North End
Balboa Blvd West
24 10,608
88 12/14/2022
22nd St
Balboa Blvd West
Ocean Front West
30 9,450
79 12/14/2022
22nd St
North End
Balboa Blvd West
40 5,200
89 12/14/2022
23rd St
Tustin Ave
Irvine Ave
35 27,230
62 12/21/2022
23rd St
City Limits
Tustin Ave
35 33,005
75 12/21/2022
23rd St
Balboa Blvd West
Ocean Front West
30 10,800
85 12/14/2022
24th St
Balboa Blvd
Ocean Front West
16 6,240
55 1/26/2023
25th St
Balboa Blvd
Ocean Front West
16 6,320
86 1/26/2023
26th St
Balboa Blvd
Ocean Front West
21 8,295
64 1/26/2023
26th St
Newport Blvd
Balboa Blvd
22 2,750
81 12/14/2022
26th St
East End
Newport Blvd
29 4,060
84 12/14/2022
27th St
Balboa Blvd
Ocean Front West
20 7,800
59 1/26/2023
28th St
Balboa Blvd West
Ocean Front West
34 13,090
36 1/26/2023
28th St
Villa Way
Newport Blvd East NB
54 11,750
69 12/14/2022
28th St
Newport Blvd East NB
Newport Blvd West SB
37 4,995
84 12/14/2022
28th St
East End
Villa Way
14 1,050
1 91
12/14/2022
28th St
Newport Blvd West SB
Balboa Blvd
60 13,200
93 12/14/2022
29th St
Newport Blvd SB
Balboa Blvd
33 10,725
58 1/27/2023
29th St
Balboa Blvd
Ocean Front West
33 12,705
61 1/27/2023
29th St
East End
Lafayette Ave
24 1,800
90 12/14/2022
29th St
Lafayette Ave
Newport Blvd NB
24 12,840
91 12/14/2022
30th St
Balboa Blvd
Ocean Front West
32 12,000
65 1/27/2023
30th St
Lafayette Ave
Villa Way
29 7,965
91 1/27/2023
30th St
Newport Blvd
180' E of Balboa Blvd
34 7,480
92 12/14/2022
30th St
Villa Way
Newport Blvd
25 11,250
93 12/14/2022
30th St
180' E of Balboa Blvd
Balboa Blvd
34 6,120
100
1/27/2023
31st St
Villa Way
Newport Blvd
24 11,832
88 12/14/2022
31st St
Lafayette Ave
Villa Way
24 8,424
93 12/14/2022
31st St
Balboa Blvd
Ocean Front West
32 12,032
93 12/14/2022
32nd St
Seashore Dr
Ocean Front West
16 3,040
91 12/14/2022
32nd St
Balboa Blvd
Seashore Dr
36 6,264
100
1/27/2023
33rd St
Balboa Blvd
Seashore Dr
20 4,960
92 12/14/2022
33rd St
Marcus Ave
Lake Ave
18 3,960
93 12/14/2022
33rd St
Lake Ave
Balboa Blvd
18 4,950
93 12/14/2022
33rd St
Seashore Or
Ocean Front West
16 2,160
93 12/14/2022
33rd St
East End
Marcus Ave
18 1,350
95 12/14/2022
34th St
Marcus Ave
Lake Ave
18 3,888
93 12/14/2022
34th St
Lake Ave
Balboa Blvd
18 5,040
93 12/14/2022
34th St
Balboa Blvd
Seashore Dr
18 4,756
93 12/14/2022
34th St
Seashore Or
Ocean Front West
17 1,700
93 12/14/2022
34th St
Clubhouse Ave
Rivo Alto
16 2,640
95 12/14/2022
34th St
Rivo Alto
Marcus Ave
16 1,056
95 12/14/2022
35th St
Lake Ave
Balboa Blvd
20 5,660
76 12/14/2022
35th St
Marcus Ave
Lake Ave
20 4,300
82 12/14/2022
35th St
Balboa Blvd
Seashore Dr
20 5,264
87 12/14/2022
35th St
I Finley Ave
I Rivo Alto
16 1,120
95 1 12/14/2022
35th St
I Rivo Alto
I Marcus Ave
16 1,360
95 1 12/14/2022
6-84
Appendix B - Local Streets

Page 2 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
35th St
Seashore Dr
Ocean Front West
20 1,800
95 12/14/2022
35th St
Short St
Finley Ave
16 4,880
95 12/16/2020
36th St
Rivo Alto
Marcus Ave
20 2,000
65 1/27/2023
36th St
Marcus Ave
Balboa Blvd
20 10,000
81 12/14/2022
36th St
Seashore Dr
Ocean Front West
20 1,780
82 1/27/2023
36th St
Balboa Blvd
Seashore Dr
20 3,124
90 12/14/2022
36th St
Balboa Blvd
Seashore Dr
20 540
90 1/27/2023
36th St
Finley Ave
Short St
16 4,880
91 12/14/2022
36th St
Short St
Clubhouse Ave
16 5,440
93 12/14/2022
36th St
Finley Ave
End
16 1,120
93 12/14/2022
37th St
Lake Ave
48' E of Park Ln
20 2,300
79 1/27/2023
37th St
Balboa Blvd
Seashore Dr
20 5,340
91 12/14/2022
37th St
Seashore Dr
Ocean Front West
20 1,400
91 1/27/2023
37th St
48' E of Park Ln
Park Ln
20 960
94 12/14/2022
38th St
East End of Bridge
Lake Ave
19 2,147
56 1/27/2023
38th St
Balboa Blvd
Seashore Dr
18 5,448
83 12/15/2022
38th St
North End
Channel PI
16 544
84 12/15/2022
38th St
Lake Ave
Balboa Blvd
22 5,984
84 1/27/2023
38th St
Finley Ave
Marcus Ave
16 4,400
87 12/15/2022
38th St
Channel PI
Finley Ave
16 3,616
93 12/15/2022
38th St
Marcus Ave
East End of Bridge
16 1,328
93 12/15/2022
38th St
Seashore Dr
Ocean Front West
20 1,440
94 1/27/2023
39th St
Marcus Ave
Rivo Alto
19 703
64 2/6/2023
39th St
Balboa Blvd
Seashore Dr
18 5,610
77 12/15/2022
39th St
River Ave
Balboa Blvd
17 2,805
81 12/15/2022
39th St
North End
Channel PI
16 560
85 12/15/2022
39th St
Seashore Dr
Ocean Front West
20 1,500
87 1/27/2023
39th St
Channel PI
Marcus Ave
16 4,400
93 12/15/2022
39th St
Rivo Alto
River Ave
20 720
96 1/27/2023
40th St
River Ave
Balboa Blvd
20 3,140
65 1/27/2023
40th St
Balboa Blvd
Seashore Dr
18 5,844
83 12/15/2022
40th St
North End
Channel PI
16 560
87 12/15/2022
40th St
Seashore Dr
Ocean Front West
20 1,320
92 1/27/2023
40th St
Rivo Alto
River Ave
20 700
94 1/27/2023
40th St
Channel PI
Marcus Ave
16 2,080
95 12/15/2022
40th St
Marcus Ave
Rivo Alto
16 560
95 12/15/2022
41st St
River Ave
Balboa Blvd
20 3,080
57 1/27/2023
41st St
Rivo Alto
River Ave
20 720
85 1/27/2023
41st St
Balboa Blvd
Seashore Dr
18 6,060
89 12/15/2022
41st St
Seashore Dr
Ocean Front West
20 1,480
92 1/27/2023
42nd St
River Ave
Balboa Blvd
20 3,160
50 1/27/2023
42nd St
Rivo Alto
River Ave
20 700
73 1/27/2023
42nd St
Balboa Blvd
Seashore Dr
18 6,350
83 12/15/2022
42nd St
Seashore Dr
Ocean Front West
19 1,406
91 1/27/2023
43rd St
Rivo Alto
River Ave
21 1,806
59 1/27/2023
43rd St
Balboa Blvd
Seashore Dr
18 6,210
79 12/15/2022
43rd St
River Ave
l Balboa Blvd
21 3,255
86 12/15/2022
43rd St
ISeashore Dr
I Ocean Front West
20 1 1,540
1 94
1 1/27/2023
44th St
I Balboa Blvd
ISeashore Dr
21 1 7,770
1 80
1 12/15/2022
6-85
Appendix B - Local Streets

Page 3 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
44th St
Seashore Dr
Ocean Front West
20 1,560
90 1/27/2023
44th St
Channel PI
Balboa Blvd
21 2,100
93 12/15/2022
45th St
Balboa Blvd
Seashore Dr
21 8,295
85 12/15/2022
45th St
Seashore Dr
Ocean Front West
20 1,500
90 1/27/2023
46th St
Balboa Blvd
Seashore Dr
21 9,198
83 12/15/2022
46th St
Seashore Dr
Ocean Front West
20 1,500
88 12/16/2020
47th St
Seashore Dr
Ocean Front West
20 1,460
88 1/27/2023
47th St
River Ave
Neptune Ave
21 6,615
93 12/15/2022
47th St
Neptune Ave
Seashore Dr
20 1,680
93 12/15/2022
48th St
River Ave
Neptune Ave
20 5,200
87 12/15/2022
48th St
Seashore Dr
Ocean Front West
20 1,440
96 1/27/2023
49th St
Seashore Dr
Ocean Front West
20 1,260
93 1/27/2023
49th St
River Dr
Neptune Ave
20 4,900
95 12/20/2022
50th St
Seashore Dr
Ocean Front West
20 1,240
93 1/30/2023
50th St
River Ave
Neptune Ave
20 4,600
95 12/20/2022
51stSt
Seashore Dr
Ocean Front West
20 1,060
89 1/30/2023
51st St
River Ave
Seashore Dr
20 6,600
95 12/20/2022
52nd St
Seashore Dr
Ocean Front West
20 1,060
86 1/30/2023
52nd St
River Ave
Neptune Ave
20 4,300
95 12/20/2022
53rd St
Seashore Dr
Ocean Front West
20 1,300
88 1/30/2023
53rd St
River Ave
Neptune Ave
20 3,620
95 12/20/2022
54th St
River Ave
Neptune Ave
38 5,320
93 12/20/2022
54th St
Seashore Dr
Ocean Front West
20 1,400
93 1/30/2023
54th St
Neptune Ave
Seashore Dr
27 2,025
95 12/20/2022
55th St
Seashore Dr
Ocean Front West
18 1,260
89 1/30/2023
56th St
Seashore Dr
Ocean Front West
20 1,640
93 1/30/2023
57th St
Seashore Dr
Ocean Front West
19 1,615
88 1/30/2023
58th St
Seashore Dr
Ocean Front West
19 1,691
89 1/30/2023
59th St
Seashore Dr
Ocean Front West
20 1,720
94 1/30/2023
60th St
North End
Coast Highway West
28 4,340
84 12/20/2022
60th St
Seashore Dr
Ocean Front West
19 1,691
84 1/30/2023
61st St
Lancaster St
Coast Highway West
20 12,900
81 12/20/2022
61stSt
Seashore Dr
Ocean Front West
19 1,615
91 12/20/2022
62nd St
Ocean Front Alley West
Ocean Front West
18 1,260
85 1/30/2023
62nd St
Lancaster St
Newport Shores Dr
29 11,745
87 12/20/2022
62nd St
Newport Shores Dr
Coast Highway West
18 2,970
91 12/20/2022
62nd St
Seashore Dr
Ocean Front Alley West
18 990
93 12/20/2022
62nd St
Canal St
Cedar St
29 24,940
94 12/20/2022
62nd St
Cedar St
Lancaster St
29 13,920
94 12/20/2022
A St
Ocean Front East
South End
60 32,100
49 12/16/2022
A St
Balboa Blvd East
Ocean Front East
20 4,200
91 2/6/2023
A St
Bay Ave East
Balboa Blvd East
20 2,700
92 2/6/2023
Abalone Ave
Park Ave
Bay Front South
28 11,620
71 8/3/2021
Abalone Ave
Abalone PI
Balboa Ave
28 3,920
82 8/3/2021
Abalone Ave
Balboa Ave
Park Ave
28 11,760
89 8/3/2021
Abalone Dr
Crystal Ave
Abalone PI
28 6,160
91 8/3/2021
Abalone PI
Abalone Dr
Crystal Ave
24 4,440
91 8/3/2021
Acacia Ave
I Coast Highway East
ISecond Ave
27 1 29,025
89 1 7/14/2021
Acacia Ave
ISecond Ave
I Pacific Dr
27 1 19,359
89 1 7/14/2021
6-86
Appendix B - Local Streets

Page 4 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Acacia St
Orchard Dr
Mesa Dr
50 56,100
73 7/14/2021
Adams St
Bay Ave East
Balboa Blvd East
19 4,750
44 2/7/2023
Adams St
Balboa Blvd East
Ocean Front Alley East
19 2,185
75 2/6/2023
Adams St
North End
Bay Ave East
21 3,255
81 2/6/2023
Agate Ave
Bay Front North
Park Ave
23 15,318
32 6/28/2021
Agate Ave
Park Ave
Bay Front South
30 15,150
37 6/28/2021
Alba St
Eastbluff Dr
Aralia St
36 4,932
89 6/25/2021
Aldean PI
15th St
End
35 9,100
81 12/19/2022
Aldebaran Cir
Galaxy Dr
End
55 9,925
87 12/22/2022
Alder PI
Alta Vista Dr
End
32 9,760
87 6/25/2021
Aleppo St
Aralia St
Alta Vista Dr
37 24,975
79 6/25/2021
Aleppo St
Alta Vista Dr
End
32 12,320
85 6/25/2021
Aliso Ave
15th St
Clay St
35 22,505
91 12/19/2022
Aliso Ave
Beacon St
Cliff Dr
35 14,700
92 12/19/2022
Aliso Ave
Clay St
Beacon St
35 23,345
93 12/19/2022
Almond PI
Alta Vista Dr
End
32 7,840
83 6/25/2021
Alta Vista Dr
Bison Ave
Bellis St
36 37,620
61 8/9/2021
Alta Vista Or
Bellis St
Aralia St
36 67,680
77 8/9/2021
Alta Vista Or
Carob St
Bison Ave
36 79,920
89 8/9/2021
Altura Dr
Marapata Dr
Angelita Dr
34 31,450
65 6/28/2021
Alvarado PI
Bay Front North
Bay Ave East
34 17,000
99 2/6/2023
Amethyst Ave
Balboa Ave
Park Ave
27 11,475
61 8/2/2021
Amethyst Ave
Bay Front North
Balboa Ave
27 15,525
63 8/2/2021
Amethyst Ave
Park Ave
Bay Front South
27 11,070
68 8/2/2021
Amigos Way
Domingo Or
Domingo Dr
36 37,980
79 8/9/2021
Anacapa Dr
Newport Center Dr East
Farallon Dr
48 36,384
97 7/14/2021
Anade Ave
Bay Ave East
Edgewater Ave East
34 17,340
96 2/7/2023
Angelita Dr
Kewamee Dr
Bayadere Ter
38 40,280
48 6/28/2021
Anita Ln
Estelle Ln
Marian Ln
33 36,366
86 12/22/2022
Anniversary Ln
Irvine Ave
End
28 61,852
71 12/22/2022
Antigua Cir
Santiago Dr
End
33 7,945
94 12/22/2022
Antigua Way
Santiago Dr (North End)
Mariners Or
37 74,460
88 12/22/2022
Antigua Way
Mariners Dr
Santiago Dr (South End)
35 35,210
89 12/22/2022
Apolena Ave
Balboa Ave
Park Ave
27 11,502
67 8/2/2021
Apolena Ave
Bay Front North
Balboa Ave
27 15,471
68 8/2/2021
Apolena Ave
Park Ave
Bay Ave South
27 11,178
76 8/2/2021
Aralia St
Aleppo St
End
35 62,125
82 6/25/2021
Arbutus St
Aleppo St
Alta Vista Or
36 41,040
79 6/25/2021
Arbutus St
Alta Vista Or
End
32 7,200
83 6/25/2021
Ashford Ln
Glenwood Ln
Santiago Dr
33 10,995
89 12/22/2022
Avocado Ave
Waterfront Dr
Coast Highway East
86 99,420
73 7/14/2021
Avocado Ave
160' N of Pacific Or
Waterfront Dr
16 1,472
90 7/14/2021
Avocado Ave
Pacific Dr
160' N of Pacific Dr
16 2,560
95 7/14/2021
Avocado Ave
San Miguel Dr
Bus Station
36 56,210
97 7/14/2021
Avocado Ave NB
Bus Station
San Joaquin Hills Rd
23 2,093
98 7/14/2021
Avocado Ave SB
167' S/O San Joaquin Hills
Bus Station
22 3,674
97 7/14/2021
Avocado Ave SB
San Joaquin Hills Rd
167' S/0 San Joaquin Hills
22 3,674
98 7/14/2021
Avon St
West End
Riverside Ave
21 18,747
90 12/22/2022
Avon St
Riverside Ave
Tustin Ave
34 15,572
95 12/22/2022
6-87
Appendix B - Local Streets

Page 5 of 28 ends

Appendix B
Complete Street Listing Current Conditions
V1�IV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Azure Ave
Orchid St
Bay View Ave
35 22,050
92 7/29/2021
B St
North End
Balboa Blvd East
20 1,800
67 2/6/2023
B St
Ocean Front East
South End
60 19,200
92 12/16/2022
B St
Balboa Blvd East
Ocean Front East
20 2,700
98 2/6/2023
Babcock St SB
City Limit
16th St West
33 10,098
83 12/21/2022
Back Bay Dr
Beginning of PCC Section
End of PCC Section
22 1,980
0 6/25/2021
Back Bay Dr
Backbay Sewer Pump Station
Access Rd
22 13,354
44 6/25/2021
Back Bay Dr
San Jaoquin Hills Rd
Beginning of PCC Section
22 59,620
75 6/25/2021
Back Bay Dr
Staired Path to Landmark
Eastbluff Dr
22 79,004
79 6/25/2021
Back Bay Dr
Beginning of PCC Section
End of PCC Section
22 6,600
79 6/25/2021
Back Bay Dr
Shellmaker Rd
Beginning of PCC Section
22 17,600
85 6/25/2021
Back Bay Or
Access Rd
Staired Path to Landmark
22 52,668
85 6/25/2021
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
22 36,278
87 6/25/2021
Back Bay Dr
End of PCC Section
Backbay sewer pump station
22 68,332
87 6/25/2021
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
61 67,710
88 6/25/2021
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
48 58,800
88 6/25/2021
Balboa Ave
Collins Ave
Marine Ave
28 48,300
32 6/29/2021
Balboa Ave
Marine Ave
Grand Canal
28 5,040
76 8/3/2021
Balboa Ave
Grand Canal
Bay Front East
28 13,440
82 8/3/2021
Balboa Blvd
19th St
End (North City Limit)
30 22,500
66 12/21/2022
Balboa Blvd E EB
B St
D St
22 21,802
59 12/16/2022
Balboa Blvd E EB
Main St
B St
27 18,765
63 12/16/2022
Balboa Blvd E EB
D St
G St
22 23,452
63 12/16/2022
Balboa Blvd E EB
G St
J St
22 21,670
90 1/30/2023
Balboa Blvd E EB
J St
L St
22 8,470
92 1/30/2023
Balboa Blvd E EB
M St
Channel Dr
18 7,074
92 1/30/2023
Balboa Blvd E EB
L St
M St
22 15,092
96 1/30/2023
Balboa Blvd E WB
G St
D St
22 23,452
60 12/16/2022
Balboa Blvd E WB
B St
Main St
27 18,765
64 12/16/2022
Balboa Blvd E WB
D St
B St
22 21,802
71 12/16/2022
Balboa Blvd E WB
J St
G St
22 21,670
91 1/30/2023
Balboa Blvd E WB
Channel Rd
M St
22 8,646
1 93
1/30/2023
Balboa Blvd E WB
M St
L St
22 15,092
93 1/30/2023
Balboa Blvd E WB
L St
J St
22 8,470
94 1/30/2023
Bamboo St
Bison Ave
Bellis St
36 64,980
71 6/25/2021
Basswood St
Alta Vista Dr
Alta Vista Dr
33 35,425
76 6/25/2021
Bay Ave E
Palm St
Main St
26 10,850
76 12/16/2022
Bay Ave E
6th St
Island Ave
28 10,360
86 12/16/2022
Bay Ave E
Main St
A St
21 5,670
86 2/6/2023
Bay Ave E
Island Ave
Medina Way
28 15,008
88 2/6/2023
Bay Ave E
Medina Way
Fernando St
28 14,420
94 2/6/2023
Bay Ave E
Fernando St
Adams St
30 17,250
95 2/6/2023
Bay Ave E
Adams St
Palm St
29 7,975
97 2/6/2023
Bay Ave W
loth St
9th St
33 15,510
88 12/16/2022
Bay Ave W
9th St
7th St
30 26,100
91 2/6/2023
Bay Ave W
13th St
loth St
34 44,880
93 2/6/2023
Bay Ave W
19th St
18th St
42 24,350
94 12/16/2022
Bay Ave W
7th St
16th St
28 12,600
95 12/16/2022
Bay Ave W
15th St
113th St
34 31,280
95 2/6/2023
6-88
Appendix B - Local Streets

Page 6 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Bay Farm PI
Upper Bay Dr
End
34 14,450
87 7/29/2021
Bay View Ave
Mesa Or
Orchard Dr
35 42,000
82 7/29/2021
Bay View Ave
Orchard Dr
Zenith Ave
35 42,000
84 7/29/2021
Bayadere Ter
Sabrina Ter
Angelita Dr
33 76,230
79 6/28/2021
Baycrest Rd
Irvine Ave
Tradewinds Ln
38 9,044
91 12/21/2022
Bayport Way
Francisco Dr
North End
34 9,742
91 12/22/2022
Bayport Way
Holiday Rd
South End
33 7,656
93 12/22/2022
Bayside Dr
El Paseo Dr
Jamboree Rd
37 85,420
57 7/2/2021
Bayside Dr
Carnation Ave
El Paseo Dr
37 126,200
79 7/2/2021
Bayside Dr
Marguerite Ave
Carnation Ave
37 74,855
91 7/2/2021
Bayside Dr
Coast Highway East
End
38 45,106
93 7/2/2021
Bayview Dr
Ocean Blvd
Goldenrod Ave
28 4,396
95 7/19/2021
Bayview Dr
Heliotrope Ave
Iris Ave
28 7,280
95 7/19/2021
Bayview Dr
Goldenrod Ave
Heliotrope Ave
28 7,028
96 7/19/2021
Bayview PI
Bristol St South
Bayview Way
54 75,170
79 7/29/2021
Bayview Way
Jamboree Rd
End
72 14,544
71 7/29/2021
Bayview Way
Shearwater PI
Bayview PI
37 32,838
76 7/29/2021
Bayview Way EB
Bayview PI
Jamboree Rd
33 21,371
91 7/29/2021
Bayview Way WB
Jamboree Rd
Bayview PI
32 19,744
90 7/29/2021
Beacon Bay
Harbor Island Rd
End
24 28,080
89 7/2/2021
Beacon St
Santa Ana Ave
Cliff Dr
34 7,140
83 12/19/2022
Beacon St
Westminster Ave
Holmwood Or
34 8,160
86 12/19/2022
Beacon St
Tustin Ave
Aliso Ave
35 21,000
91 12/19/2022
Beacon St
Aliso Ave
Irvine Ave
35 22,330
91 12/19/2022
Beacon St
La Jolla Dr
Santa Ana Ave
33 3,465
95 12/19/2022
Bedford Ln
Rutland Rd
Buckingham Ln
36 23,076
91 12/22/2022
Begonia Ave
Pacific Dr
Coast Highway East
28 52,780
89 7/14/2021
Bellis St
Bamboo St
Alta Vista
37 27,010
75 6/25/2021
Bellis St
Alta Vista Or
End
32 15,200
86 6/25/2021
Berkshire Ln
Oxford Ln
Cambridge Ln
34 32,198
84 12/22/2022
Beryl Ln
Priscilla Ln
Vivian Ln
34 41,864
81 12/22/2022
Birch St
Mesa Dr
End
36 9,552
89 7/14/2021
Bison Ave
Bamboo St
Jamboree Rd
36 41,780
87 6/25/2021
Bixia St
Eastbluff Dr
Bamboo St
35 5,250
86 6/25/2021
Blackthorn St
Bellis St
Bison Ave
34 47,090
84 6/25/2021
Blue Gum Ln
Westcliff Dr
End
32 25,500
49 12/22/2022
Blue Key
Sandcastle Or
End
32 26,700
95 6/29/2021
Blue Water Dr
Salt Air Dr
Crown Dr North
32 35,028
96 6/29/2021
Bodega Bay Dr
San Mateo Way
End
36 48,780
59 7/2/2021
Bolsa Ave
Broad St
Clay St
38 7,714
81 12/19/2022
Bolsa Ave
Clay St
15th St
36 14,616
93 12/19/2022
Bonaire Way
Holiday Rd
South End
33 10,255
91 12/22/2022
Bonaire Way
Francisco Dr
North End
33 7,425
91 12/22/2022
Bonnie Doon Ter
Dolphin Ter
Patolita Or
37 39,479
64 6/28/2021
Bonnie Doon Ter
Patolita Dr
Ramona Dr
37 54,797
65 6/28/2021
Bonnie Doon Ter
Ramona Dr
Malabar Dr
37 12,950
81 6/28/2021
Bowsprit Dr
MacArthur Blvd
Dove St
44 13,464
90 7/29/2021
Braemar Way
Francisco Or
End
34 9,810
91 12/22/2022
6-89
Appendix B - Local Streets

Page 7 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Breakers Or
Ocean Blvd
Breakers Dr
20 18,000
80 8/6/2021
Breakers Dr
Breakers Dr
End
25 25,875
90 8/6/2021
Brighton Rd
Cameo Shores Rd
Camden Or
33 48,370
91 7/1/2021
Broad St
Santa Ana Ave
San Bernardino Ave
20 5,600
58 2/9/2023
Broad St
Westminster Ave
Santa Ana Ave
35 25,375
1 86
12/19/2022
Broad St
San Bernardino Ave
Redlands Ave
35 9,975
87 12/19/2022
Broad St
Bolsa Ave
Westminster Ave
36 22,608
93 12/19/2022
Broad St
Santa Ana Ave
San Bernardino Ave
16 4,480
93 12/19/2022
Buck Gully Dr
Sandcastle Dr
End
36 5,786
96 6/29/2021
Buckeye St
Bellis St
Bison Ave
32 38,080
81 6/25/2021
Buckingham Ln
Westcliff Dr
Cornwall Ln
36 22,320
89 12/22/2022
Bunya St
Bellis St
Bison Ave
32 49,760
70 6/25/2021
Buttonshell Ln
Holiday Rd
Nautilus Ln
33 14,130
90 12/22/2022
C St
Balboa Blvd East
Ocean Front East
20 1,600
44 2/7/2023
C St
North End
Balboa Blvd East
15 1,170
52 2/7/2023
Cabrillo Ter
Serra Dr
De Anza Dr
23 19,787
94 6/28/2021
Cacao St
Eastbluff Dr
Catalpa St
36 5,400
84 6/25/2021
Cambria Dr
El Capitan Dr
Drakes Bay Dr
32 80,320
81 7/2/2021
Cambridge Ln
Devon Ln
Highland Dr
34 27,902
83 12/22/2022
Camden Dr
Cameo Shores Rd
Milford Dr
33 44,385
91 7/1/2021
Camelback St
La Felicidad
Bison Ave
78 55,821
76 7/28/2021
Camelback St
Jamboree Rd
La Felicidad
40 60,825
89 7/28/2021
Cameo Highlands Dr
Coast Highway East
Garrett Dr
37 49,321
97 7/1/2021
Cameo Shores Rd
Coast Highway East
Orrington Rd
37 37,777
91 7/1/2021
Cameo Shores Rd
Orrington Rd
Brighton Rd
37 35,372
92 11/25/2019
Camphor St
Catalpa St
Alta Vista Dr
37 31,339
74 6/25/2021
Canal Cir
Canal St
Canal St
29 7,685
92 12/20/2022
Canal St
62nd St
Canal Cir (West End)
30 8,100
93 12/20/2022
Canal St
Canal Cir (West End)
Sunset Dr
30 12,600
93 12/20/2022
Canal St
Sunset Dr
Grant St
30 29,070
93 12/20/2022
Candlestick Ln
Glenwood Ln
Sandalwood Ln
35 23,250
91 12/22/2022
Carmel Bay Dr
Point Loma Dr
Spyglass Hill Rd
36 58,860
70 7/2/2021
Carnation Ave
Ocean Blvd
Seaview Ave
30 8,910
63 8/2/2021
Carnation Ave
First Ave
Coast Highway East
27 38,475
68 7/1/2021
Carnation Ave
Bayside Dr
First Ave
37 12,366
75 7/2/2021
Carob St
Camphor St
End
34 80,240
78 6/25/2021
Cassia St
Camphor St
Carob St
32 39,840
75 6/25/2021
Castaways Ln
Dover Dr
Castaways (private) North
54 24,948
92 12/22/2022
Catalina Dr
Old Newport Blvd
Broad St
34 57,800
83 12/19/2022
Catalina Dr
Broad St
Clay St
34 10,982
83 12/19/2022
Catalina Dr
Clay St
15th St
34 23,018
86 12/19/2022
Catalpa St
Camphor St
Carob St
35 52,500
81 6/25/2021
Catamaran Dr
Keel Dr
End
36 37,350
96 6/29/2021
Cedar St
Prospect St
Newport Shores Dr
29 19,430
88 12/20/2022
Cedar St
Ocean Front Alley West
Ocean Front West
19 1,349
89 1/30/2023
Cedar St
Newport Shores Dr
Coast Highway West
19 3,515
93 12/20/2022
Cedar St
East End
Prospect St
29 8,700
95 12/20/2022
6-90
Appendix B - Local Streets

Page 8 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Cedar St
Seashore Dr
Ocean Front Alley West
19 1,083
95 12/20/2022
Ceiba PI
Carob St
End
54 11,780
77 6/25/2021
Celtis PI
Alta Vista Dr
End
54 10,260
84 6/25/2021
Centella PI
Holiday Rd
South End
33 12,177
91 12/22/2022
Centella PI
Santiago Dr
North End
37 12,305
93 12/22/2022
Central Ave
Via Lido
End
40 12,600
88 2/6/2023
Cercis PI
Alta Vista Dr
End
32 7,040
91 6/25/2021
Channel PI
Balboa Blvd
Rivo Alto (River)
21 6,195
93 12/16/2022
Channel PI
39th St
Rialto
16 7,040
93 12/16/2022
Channel PI
Rivo Alto
39th St
16 11,888
95 12/16/2022
Channel Rd
Granada Dr
End
38 55,670
78 2/6/2023
Channel Rd
Balboa Blvd
Granada Dr
36 5,976
94 2/6/2023
Cherry Tree Ln
Redland Dr
End
34 6,800
67 12/22/2022
Chestnut PI
Alta Vista Dr
End
32 7,040
86 6/25/2021
China Cove Ramp
Ocean Blvd
Fernleaf Ave
19 5,320
57 8/5/2021
Chubasco Dr
Evita Dr
Zahma Dr
37 25,530
70 6/28/2021
Churchill Ct
Emerson St
End
20 2,700
84 2/6/2023
Citrus PI
Alta Vista Dr
End
32 9,120
83 6/25/2021
Civic Center Dr
Avocado Ave
Newport Center Dr
48 74,832
97 7/14/2021
Clay St
Westminster Ave
Orange Ave
32 25,600
73 12/19/2022
Clay St
Irvine Ave
Tustin Ave
34 46,126
85 12/19/2022
Clay St
Tustin Ave
Westminster Ave
34 66,674
89 12/19/2022
Clay St
15th St
St Andrews Rd
34 25,840
95 12/21/2022
Clay St
St Andrews Rd
Irvine Ave
34 22,372
95 12/21/2022
Cliff Dr
Kings PI
Signal Rd
S5
23,430
71 12/21/2022
Cliff Dr
Dover Dr
Kings PI
55 41,580
80 12/21/2022
Cliff Dr
Signal Rd
St Andrews Rd
55 55,550
80 12/21/2022
Cliff Dr
Beacon St
Santa Ana Ave
34 25,160
84 12/19/2022
Cliff Dr
St Andrews Place
Irvine Ave
55 64,519
85 12/21/2022
Cliff Dr
Riverside Ave
Beacon St
33 35,046
86 12/19/2022
Cliff Dr
Irvine Ave
Riverside Ave
56 92,820
92 12/19/2022
Cliff Dr
Santa Ana Ave
La Jolla Dr
52 15,600
93 12/19/2022
Clubhouse Ave
Newport Island Channel
Rivo Alto
17 17,441
95 12/16/2022
Coast Blvd
61st St
End
30 3,990
93 12/20/2022
Collins Ave
Bay Front North
Balboa Ave
28 12,320
48 8/2/2021
Collins Ave
Balboa Ave
Park Ave
28 12,012
1 59
8/2/2021
Collins Ave
Park Ave
Bay Front South
27 11,313
64 8/2/2021
Colton St
Ocean Front Alley West
Ocean Front West
21 924
66 1/30/2023
Colton St
Sunset Dr
Newport Shores Dr
29 22,040
79 12/20/2022
Colton St
Sunset Dr
Prospect St
29 11,792
82 12/20/2022
Colton St
Newport Shores Dr
End
18 3,060
87 12/20/2022
Colton St
Seashore Dr
Ocean Front Alley West
18 1,080
87 12/20/2022
Columbus Cir
Serra Dr
End
22 3,464
88 6/28/2021
Commodore Rd
Tradewinds Ln
Mariners Dr
38 75,300
90 12/22/2022
Constellation Dr
Santiago Dr
End
38 5,130
95 12/21/2022
Coral Ave
Balboa Ave
Park Ave
27 11,259
61 8/2/2021
Coral Ave
Bay Front North
Balboa Ave
27 15,525
62 8/2/2021
6-91
Appendix B - Local Streets

Page 9 of 28 ends

Appendix B
Complete Street Listing Current Conditions
V1�IV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Coral Ave
Bay Front South
Park Ave
27 11,070
65 8/2/2021
Coral PI
Irvine Ave
St Andrews Ave
35 28,070
95 12/19/2022
Corinthian Way
MacArthur Blvd
Birch St
44 38,544
86 8/9/2021
Cornwall Ln
Pembroke Ln
Dover Dr
34 24,808
84 12/22/2022
Coronado St
Edgewater Ave East
Bay Ave East
34 14,960
65 2/6/2023
Coronado St
Bay Ave East
Balboa Blvd East
28 5,180
71 2/6/2023
Coronado St
Balboa Blvd East
Ocean Front East
27 4,752
87 2/6/2023
Cortes Cir
Serra Dr
End
22 2,980
81 6/28/2021
Cortland Dr
Rockford PI
Cameo Highlands Dr
37 25,974
97 7/1/2021
Cortland Dr
Cameo Highlands Dr
Garrett Dr
37 36,593
97 7/1/2021
Court Ave
19th St
20th St
28 8,540
65 2/9/2023
Court Ave
20th St
McFadden PI
28 5,600
77 2/7/2023
Court Ave
20th St
McFadden PI
28 2,380
87 12/16/2022
Cove St
Fernleaf Ave
End
24 3,960
63 8/5/2021
Cove St
Way Ln
End
24 2,200
82 8/5/2021
Crown Dr
Sea Ln
Crown Dr North
37 42,624
96 6/29/2021
Crown Dr North
Crown Dr
San Joaquin Hills Rd
36 49,320
96 6/29/2021
Crystal Ave
Park Ave
Bay Front South
28 11,480
73 8/3/2021
Crystal Ave
Abalone Dr
Balboa Ave
24 11,520
87 8/3/2021
Crystal Ave
Balboa Ave
Park Ave
28 12,040
88 8/3/2021
Cumberland Ln
Sussex Ln
Dover Dr
34 15,390
86 12/22/2022
Cutter Rd
Beacon Bay
End
24 9,120
89 7/2/2021
Cypress St
Edgewater PI
Bay Ave East
20 5,460
85 2/6/2023
Cypress St
Bay Ave East
Balboa Blvd East
20 5,800
87 2/6/2023
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
36 47,520
87 7/29/2021
Cypress St (S/A Heights)
Orchard Dr
CulDe Sac
36 35,280
90 7/29/2021
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
36 9,360
91 7/29/2021
D St
Balboa Blvd East
Ocean Front East
19 1,520
39 2/7/2023
D St
North End
Balboa Blvd East
20 1,500
40 2/7/2023
Dahlia Ave
South End
Way Ln
27 3,915
64 8/5/2021
Dahlia Ave
Coast Highway East
Fifth Ave
27 4,455
68 8/5/2021
Dahlia Ave
200' S of First St
Coast Highway East
27 40,230
90 8/4/2021
Dahlia Ave
Ocean Blvd
Seaview Ave
27 7,425
91 8/5/2021
Dahlia PI
Seaview Ave
End
27 3,753
44 8/5/2021
Dana Point Way
San Martin Way
Montecito Dr
36 6,084
84 7/2/2021
Dana Rd
Superior Ave
Flagship Rd
36 21,600
79 12/21/2022
Dawnview Ln
Redland Dr
Redland Dr
33 5,280
69 12/21/2022
De Anza Dr
Seaward Rd
De Sola Ter
35 26,250
89 6/28/2021
De Sola Ter
Seaward Rd
End
24 28,015
79 6/28/2021
Deborah Ln
Vivian Ln
Sylvia Ln
34 22,122
86 12/22/2022
Deborah Ln
Mariners Dr
Vivian Ln
34 8,262
89 12/22/2022
Devon Ln
Oxford Ln
Cambridge Ln
33 25,290
81 12/22/2022
Diamond Ave
Bay Front North
Balboa Ave
28 13,888
55 8/2/2021
Diamond Ave
Balboa Ave
Park Ave
1 28
1 12,040
61 8/2/2021
Diamond Ave
Park Ave
Bay Front South
27 11,286
66 8/2/2021
Diana Ln
Priscilla Ln
Vivian Ln
34 27,108
93 12/22/2022
Dolphin Ter
Bonnie Doone Ter
Patolita Dr
33 41,778
70 6/28/2021
6-92
Appendix B - Local Streets

Page 10 of 28 ends

Appendix B
Complete Street Listing Current Conditions
V1�IV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Dolphin Ter
Patolita Dr
Ramona Dr
33 43,098
79 6/28/2021
Dolphin -Striker Way
Dove St
End
44 16,740
89 7/30/2021
Domingo Dr
Mar Vista Dr
Mar Vista Or
36 60,300
68 8/9/2021
Donnie Rd
22nd St
End
33 20,320
90 12/22/2022
Dorchester Rd
Rockford Rd
Cameo Highland Rd
33 27,225
97 7/1/2021
Dorchester Rd
Cameo Highland Rd
Garrett Rd
33 30,030
97 7/1/2021
Doris Ln
Dover Or
Ruth Ln
36 8,676
83 12/22/2022
Dorothy Ln
Estelle Ln
Marian Ln
34 31,280
84 12/22/2022
Dorothy Ln
Mariners Dr
Estelle Ln
33 7,854
86 12/22/2022
Dove St
Birch St
Bristol St North
44 176,670
83 7/30/2021
Dove St
Campus Dr
Birch St
37 21,645
92 7/30/2021
Dover Or
End
Leila Ln
29 15,768
92 12/21/2022
Dover Or
Leila Ln
Mariners Or
29 14,500
94 12/21/2022
Dover Or
Westcliff Dr
Dover Dr (Arterial)
36 5,460
94 12/21/2022
Dover Dr
Mariners Dr
Doris Ln
29 14,790
95 12/21/2022
Dover Dr
Doris Ln
Nottingham Rd
29 17,110
95 12/21/2022
Dover Or
Nottingham Rd
Norfolk Ln
29 19,285
95 12/21/2022
Dover Or
Norfolk Ln
Westcliff Or
29 14,210
95 12/21/2022
Drakes Bay Dr
Point Aguello Way
Point Conception Way
32 44,192
66 7/2/2021
Drakes Bay Dr
Goleta Point Or
Point Aguello Way
32 9,358
80 7/2/2021
Drakes Bay Dr
Point Conception Way
Montecito Dr
32 15,822
80 7/2/2021
Driftwood Rd
Shorecliff Rd
Morning Canyon Rd
27 29,700
79 6/28/2021
E St
Balboa Blvd East
North End
20 1,560
39 2/7/2023
E St
Balboa Blvd East
Ocean Front East
20 1,660
41 2/7/2023
East Coastal Peak
Ridge Park Rd
1195' S of Ridge Park Rd
37 44,215
97 6/24/2021
Eastgate Dr
Newport Hills Dr East
San Miguel Dr
56 11,110
59 7/28/2021
Ebbtide Rd
Crown Dr
Sandpiper Dr
33 43,461
95 6/29/2021
El Capitan Or
Point Arguella Way
Point Conception Way
44 71,282
74 7/2/2021
El Capitan Or
Spyglass Hill Rd
Point Arguello Way
44 54,384
77 7/2/2021
El Modena Ave
Cliff Dr
Beacon St
35 14,350
75 12/19/2022
El Modena Ave
Beacon St
Clay St
35 23,345
93 12/19/2022
El Modena Ave
Clay St
15th St
35 22,925
93 12/19/2022
El Paseo Or
Bayside Dr
Malabar Dr
34 18,700
53 6/28/2021
Emerald Ave
Park Ave
Bay Front South
27 9,153
44 6/28/2021
Emerald Ave
Bay Front North
Park Ave
27 8,640
46 6/28/2021
Emerson St
Tustin Ave
City Limits
30 10,200
73 12/21/2022
Essex Ln
Cambridge Ln
Oxford Ln
34 28,424
88 12/22/2022
Estelle Ln
Highland Or
Santiago Or
33 11,946
75 12/22/2022
Estelle Ln
Ruth Ln
Highland Dr
33 45,744
82 12/22/2022
Eton PI
Dover Or
End
33 7,879
91 12/22/2022
Evening Canyon Rd
Shorecliff Rd
Morning Canyon Rd
28 63,360
75 6/28/2021
Evening Star Ln
Polaris Dr
End
33 34,840
87 12/22/2022
Evita Dr
Seadrift Dr
Chubasco Dr
58 12,760
74 6/28/2021
F St
North End
Balboa Blvd East
20 2,900
55 2/7/2023
FSt
Balboa Blvd East
Ocean Front East
26 5,850
63 12/16/2022
Fairfield Or
Cameo Shores Rd
Milford Dr
33 44,715
91 8/6/2021
Fairhill Dr
123rd St
End
34 18,462
74 12/22/2022
6-93
Appendix B - Local Streets

Page 11 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Fern St
Ocean Front Alley West
Ocean Front West
20 1,400
77 1/30/2023
Fern St
Canal St
Coast Highway West
30 8,190
87 12/20/2022
Fern St
Seashore Or
Ocean Front Alley West
17 1,054
89 12/20/2022
Fernando Street
Edgewater Ave East
Bay Ave East
30 10,680
86 12/16/2022
Fernleaf Ave
Ocean Blvd
Seaview Ave
30 8,850
37 7/19/2021
Fernleaf Ave
250' S of First St
Coast Highway East
27 34,020
86 8/4/2021
Fernleaf Ave
Coast Highway East
Fifth Ave
27 9,990
90 8/5/2021
Fernleaf Ave
Cove St
China Cove Ramp
21 6,510
91 8/5/2021
Fernleaf Ave
Seaview Ave
150' N Seaview Ave
27 4,050
91 7/19/2021
Fernleaf Ave
150' N Seaview Ave
Bayside Dr
28 9,520
91 7/19/2021
Fifth Avenue
Jasmine Ave
Marguerite Ave
28 18,390
84 6/28/2021
Fifth Avenue
Marguerite Ave
Marigold Ave
36 11,520
89 6/28/2021
Fifth Avenue
Marigold Ave
Poppy Ave
36 42,300
89 6/28/2021
Fifth Avenue
Dahlia Ave
Heliotrope Ave
33 29,535
98 7/1/2021
Fifth Avenue
Heliotrope Ave
Iris Ave
32 9,280
98 7/1/2021
Finley Ave
38th St
Channel PI
16 3,520
93 12/16/2022
Finley Ave
Newport Blvd
Clubhouse Ave
16 3,040
95 12/16/2022
Finley Ave
Clubhouse Ave
End
16 10,640
95 12/16/2022
Finley Ave
Rialto
38th St
16 560
95 12/16/2022
First Ave
Heliotrope Ave
Iris Ave
27 7,290
69 7/14/2021
First Ave
Goldenrod Ave
Heliotrope Ave
27 7,290
87 7/14/2021
First Ave
Iris Ave
Jasmine Ave
27 7,290
88 7/14/2021
First Ave
Dahlia Ave
Fernleaf Ave
27 7,290
90 7/14/2021
First Ave
Fernleaf Ave
Goldenrod Ave
27 7,290
92 7/14/2021
First Ave
Begonia Ave
Carnation Ave
27 7,290
95 7/14/2021
First Ave
Acacia Ave
Begonia Ave
27 7,344
96 7/14/2021
First Ave
Carnation Ave
Dahlia Ave
27 7,317
96 7/14/2021
Flagship Rd
Dana Rd
Placentia Ave
37 39,220
60 12/21/2022
Ford Rd
Hillside Dr
East End
32 22,320
84 7/28/2021
Ford Rd EB
West End
San Miguel Dr
30 26,900
89 7/28/2021
Ford Rd WB
Newport Hills Or
West End
29 25,433
87 12/12/2019
Fourth Ave
Iris Ave
Jasmine Ave
27 7,425
70 7/1/2021
Fourth Ave
Marigold Ave
Narcissus Ave
27 7,209
70 7/1/2021
Fourth Ave
Marguerite Ave
Marigold Ave
27 7,290
74 7/1/2021
Fourth Ave
Orchid Ave
Poinsettia Ave
27 7,290
80 7/1/2021
Fourth Ave
Jasmine Ave
Larkspur Ave
27 7,182
86 7/1/2021
Fourth Ave
Acacia Ave
Begonia Ave
27 7,209
90 7/19/2021
Fourth Ave
Avocado Ave
Acacia Ave
27 7,155
91 7/19/2021
Fourth Ave
Begonia Ave
Carnation Ave
27 7,155
91 7/19/2021
Fourth Ave
Carnation Ave
Dahlia Ave
27 7,155
91 7/19/2021
Fourth Ave
Heliotrope Ave
Iris Ave
27 7,236
92 7/1/2021
Fourth Ave
Goldenrod Ave
Heliotrope Ave
27 7,020
93 7/1/2021
Fourth Ave
Larkspur Ave
Marguerite Ave
27 7,560
95 7/1/2021
Fourth Ave
Narcissus Ave
Orchid Ave
27 7,371
95 7/1/2021
Fourth Ave
Poinsettia Ave
Poppy Ave
27 7,263
96 7/1/2021
Francisco Dr
Tustin Ave
Irvine Ave
37 47,730
85 12/21/2022
Francisco Dr
Irvine Ave
Tradewinds Ln
36 8,496
91 12/21/2022
6-94
Appendix B - Local Streets

Page 12 of 28 ends

Appendix B
Complete Street Listing Current Conditions
r►II I
%2VIV

PAVEMENT

ENGINEERING
Local Streets
Street Name
From
To
Width of Segment
Area (SF)
Current PCI
Most Recent Inspection
Date
Fullerton Ave
Cliff Dr
Beacon St
35 14,805
93 12/19/2022
Fullerton Ave
Beacon St
Clay St
35 23,345
93 12/19/2022
Fullerton Ave
Clay St
15th St
35 22,505
93 12/19/2022
G St
Ocean Blvd
Ocean Front East
30 6,000
57 2/7/2023
G St
North End
Balboa Blvd East
20 3,620
64 2/7/2023
G St
Balboa Blvd East
Ocean Blvd
36 6,344
81 12/16/2022
Galatea Ter
Bayadere Ter
Angelita Dr
33 57,750
82 6/28/2021
Galaxy Dr
Santiago Dr (South End)
Rigel Cir
37 53,983
49 12/21/2022
Galaxy Dr
Mariners Dr
Holiday Dr
34 49,368
49 12/21/2022
Galaxy Dr
Rigel Cir
Mariners Dr
37 72,372
70 12/21/2022
Galaxy Dr
Hoilday Dr
Santiago Or (North End)
34 74,868
70 12/21/2022
Garnet Ave
Park Ave
Bay Front South
25 9,800
36 6/28/2021
Garnet Ave
Bay Front North
Park Ave
27 12,987
54 6/28/2021
Garrett Dr
Cortland Dr
Cameo Highlands Dr
37 31,080
97 7/1/2021
Gary PI
15th St
End
33 8,580
86 12/19/2022
Glenwood Ln
Candlestick Ln
Ashford Ln
33 22,320
91 12/22/2022
Golden Cir
Anniversary Ln
Anniversary Ln
33 40,161
73 12/22/2022
Goldenrod Ave
Seaview Ave
End
30 6,900
43 7/19/2021
Goldenrod Ave
Ocean Blvd
150' S of Seaview Ave
27 10,125
46 7/19/2021
Goldenrod Ave
Sea Ln
Harbor View Dr
33 33,264
62 7/19/2021
Goldenrod Ave
Fifth Ave
Sea Ln
36 10,152
79 7/19/2021
Goldenrod Ave
150' S of Seaview Ave
Seaview Ave
28 4,200
86 7/19/2021
Goldenrod Ave
End
Coast Highway East
28 31,472
91 7/19/2021
Goldenrod Ave
Coast Highway East
Fourth Ave
27 5,130
93 7/19/2021
Goldenrod Ave
Fourth Ave
Fifth Ave
27 9,450
93 7/19/2021
Goldenrod Ave
Harbor View Dr
Crown Dr
33 38,445
94 6/29/2021
Goldenrod Ave
Crown Or
Wavecrest Dr
35 22,225
96 6/29/2021
Goleta Point Dr
Drakes Bay Dr
Morro Bay Dr
32 53,820
78 7/2/2021
Gorham Or
Cameo Shores Rd
Milford Dr
33 46,200
88 7/1/2021
Granada Ave
M St
Channel Rd
30 10,800
86 2/6/2023
Grant St
Seashore Dr
Ocean Front Alley West
17 1,105
88 12/20/2022
Grant St
North End
Coast Highway West
29 9,425
92 12/20/2022
Grant St
Ocean Front Alley West
Ocean Front West
21 1,470
92 1/30/2023
Granville Or
Newport Center Or
Gate
26 10,088
97 7/14/2021
Grove Ln
Westcliff Dr
End
32 23,004
74 12/22/2022
H St
North End
Balboa Blvd East
20 3,640
1 88
2/6/2023
Half Moon Bay Dr
Point Loma Dr
Point Arena Way
32 32,904
67 7/2/2021
Hampden Rd
Milford Dr
Cameo Shores Rd
37 34,410
91 8/6/2021
Hampden Rd
Cameo Shores Rd
End
37 8,131
91 8/6/2021
Hampshire Cir
Antigua Way
Antigua Way
34 25,534
91 12/22/2022
Hampshire Ct
Hampshire Cir
End
50 9,200
91 12/22/2022
Hampshire Ln
Santiago Dr
Antigua Way
34 8,500
88 12/22/2022
Hampshire Ln
Lincoln Ln
Santiago Dr
34 8,500
90 12/22/2022
Harbor Island Dr
Bayside Dr
Harbor Island Rd
43 34,250
1 89
7/2/2021
Harbor Island Dr
Harbor Island Rd
E End
37 68,894
91 7/2/2021
Harbor Island Dr
Harbor Island Dr
N End
36 6,840
93 7/2/2021
Harbor Island Rd
Harbor Island Dr
S End
30 17,550
81 7/2/2021
6-95
Appendix B - Local Streets

Page 13 of 28 ends
← All documents from this meeting