LIST OF ASSESSMENTS
LANDSCAPE MAINTENANCE DISTRICT NO. 5 (HAWK’S CREST – TRACT 30230) FISCAL YEAR 2022-2023
As Preliminarily As Finally Confirmed As Preliminarily As Finally Confirmed Lot No. Approved and Recorded Lot No. Approved and Recorded 1 $1,301.93 45 $1,301.93
2 $1,301.93 46 $1,301.93
3 $1,301.93 47 $1,301.93
4 $1,301.93 48 $1,301.93
5 $1,301.93 49 $1,301.93
6 $1,301.93 50 $1,301.93
7 $1,301.93
8 $1,301.93
10 $1,301.93
11 $1,301.93
12 $1,301.93
13 $1,301.93
14 $1,301.93
15 $1,301.93
16 $1,301.93
17 $1,301.93
18 $1,301.93
19 $1,301.93
20 $1,301.93
21 $1,301.93
22 $1,301.93
23 $1,301.93
24 $1,301.93
25 $1,301.93
26 $1,301.93
27 $1,301.93
28 $1,301.93
29 $1,301.93
30 $1,301.93
31 $1,301.93
32 $1,301.93
33 $1,301.93
34 $1,301.93
35 $1,301.93
36 $1,301.93
37 $1,301.93
38 $1,301.93
39 $1,301.93
40 $1,301.93
41 $1,301.93
42 $1,301.93
43 $1,301.93
44 $1,301.93
TOTAL NUMBER OF PARCELS TO BE ASSESSED: 50
TOTAL TO BE ASSESSED: $ 65,096.50

Page 202 of 375 ends

RESOLUTION NO. 2022-44

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, APPROVING THE ENGINEER’S “PRELIMINARY
REPORT” AND THE ANNUAL LEVY OF ASSESSMENTS FOR THE
FISCAL YEAR 2022-2023 IN SAID DISTRICT.

WHEREAS, the City Council of the City of Norco, California, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by previous Resolution, order the preparation of an Engineer’s “Report” for the annual levy of assessments, consisting of plans and specifications, an estimate of the cost, a diagram of the district, and an assessment relating to what is now known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 1 (BEAZER)
(hereinafter referred to as the “District”); and
WHEREAS, there has now been presented to this City Council the “Report” as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution; and
WHEREAS, this City Council has now carefully examined and reviewed the “Report” as presented, and is satisfied with each and all of the items and documents as set forth therein, and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said “Report.”
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, does hereby resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

SECTION 2: That the “Report” as presented, consisting of the following:

A. Plans and specifications;
B. Estimate of cost;
C. Diagram of the District;
D. Assessment of the estimated cost;
is hereby approved on a preliminary basis, and is ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.

Page 203 of 375 ends

Resolution No. 2022-44 – LMD 1(Beazer)

Page 2 ends

July 6, 2022
SECTION 3: That the City Clerk shall certify to the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Engineer’s “Report.”
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
____________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_______________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, Dana Roa, CMC, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 204 of 375 ends

RESOLUTION NO. 2022-45

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, APPROVING THE ENGINEER’S “PRELIMINARY
REPORT” AND THE ANNUAL LEVY OF ASSESSMENTS FOR THE
FISCAL YEAR 2022-2023 IN SAID DISTRICT
WHEREAS, the City Council of the City of Norco, California, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by previous Resolution, order the preparation of an Engineer’s “Report” for the annual levy of assessments, consisting of plans and specifications, an estimate of the cost, a diagram of the district, and an assessment relating to what is now known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 2 (WESTERN PACIFIC) (hereinafter referred to as the “District”); and
WHEREAS, there has now been presented to this City Council the “Report” as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution; and
WHEREAS, this City Council has now carefully examined and reviewed the “Report” as presented, and is satisfied with each and all of the items and documents as set forth therein, and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said “Report.”
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, does hereby resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

SECTION 2: That the “Report” as presented, consisting of the following:

A. Plans and specifications;
B. Estimate of cost;
C. Diagram of the District;
D. Assessment of the estimated cost;
is hereby approved on a preliminary basis, and is ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.

Page 205 of 375 ends

Resolution No. 2022-45 – LMD 2 (Western Pacific)

Page 2 ends

July 6, 2022
SECTION 3: That the City Clerk shall certify to the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Engineer’s “Report.”
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
_________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 206 of 375 ends

RESOLUTION NO. 2022-46

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, APPROVING THE ENGINEER’S “PRELIMINARY
REPORT” AND THE ANNUAL LEVY OF ASSESSMENTS FOR THE
FISCAL YEAR 2022-2023 IN SAID DISTRICT.

WHEREAS, the City Council of the City of Norco, California, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by previous Resolution, order the preparation of an Engineer’s “Report” for the annual levy of assessments, consisting of plans and specifications, an estimate of the cost, a diagram of the district, and an assessment relating to what is now known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 3 (CENTEX)
(hereinafter referred to as the “District”); and
WHEREAS, there has now been presented to this City Council the “Report” as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution; and
WHEREAS, this City Council has now carefully examined and reviewed the “Report” as presented, and is satisfied with each and all of the items and documents as set forth therein, and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said “Report.”
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, does hereby resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

SECTION 2: That the “Report” as presented, consisting of the following:

A. Plans and specifications;
B. Estimate of cost;
C. Diagram of the District;
D. Assessment of the estimated cost;
is hereby approved on a preliminary basis, and is ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.

Page 207 of 375 ends

Resolution No. 2022-46 – LMD 3 (Centex)

Page 2 ends

July 6, 2022
SECTION 3: That the City Clerk shall certify to the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Engineer’s “Report.”
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 208 of 375 ends

RESOLUTION NO. 2022-47

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, APPROVING THE ENGINEER’S “PRELIMINARY
REPORT” AND THE ANNUAL LEVY OF ASSESSMENTS FOR THE
FISCAL YEAR 2022-2023 IN SAID DISTRICT.

WHEREAS, the City Council of the City of Norco, California, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by previous Resolution, order the preparation of an Engineer’s “Report” for the annual levy of assessments, consisting of plans and specifications, an estimate of the cost, a diagram of the district, and an assessment relating to what is now known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 4 (NORCO RIDGE RANCH) (hereinafter referred to as the “District”); and
WHEREAS, there has now been presented to this City Council the three optional “Reports” as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution; and
WHEREAS, this City Council has now carefully examined and reviewed the “Report” as presented, and is satisfied with each and all of the items and documents as set forth therein, and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said “Report.”
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, does hereby resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

SECTION 2: That the “Reports” as presented, consisting of the following:

A. Plans and specifications;
B. Estimate of cost;
C. Diagram of the District;
D. Assessment of the estimated cost;
is hereby approved on a preliminary basis, and is ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.

Page 209 of 375 ends

Resolution No. 2022-47 – LMD 4 (Norco Ridge Ranch)

Page 2 ends

July 6, 2022
SECTION 3: That the City Clerk shall certify to the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Engineer’s “Reports.”
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
__________________________
Greg newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 210 of 375 ends

RESOLUTION NO. 2022-48

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, APPROVING THE ENGINEER’S “PRELIMINARY
REPORT” AND THE ANNUAL LEVY OF ASSESSMENTS FOR THE
FISCAL YEAR 2022-2023 IN SAID DISTRICT.

WHEREAS, the City Council of the City of Norco, California, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by previous Resolution, order the preparation of an Engineer’s “Report” for the annual levy of assessments, consisting of plans and specifications, an estimate of the cost, a diagram of the district, and an assessment relating to what is now known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 5 (HAWK’S CREST)
(hereinafter referred to as the “District”); and
WHEREAS, there has now been presented to this City Council the “Report” as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution; and
WHEREAS, this City Council has now carefully examined and reviewed the “Report” as presented, and is satisfied with each and all of the items and documents as set forth therein, and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said “Report.”
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, does hereby resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

SECTION 2: That the “Report” as presented, consisting of the following:

A. Plans and specifications;
B. Estimate of cost;
C. Diagram of the District;
D. Assessment of the estimated cost;
is hereby approved on a preliminary basis, and is ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.

Page 211 of 375 ends

Resolution No. 2022-48 – LMD 5 (Hawk’s Crest)

Page 2 ends

July 6, 2022
SECTION 3: That the City Clerk shall certify to the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Engineer’s “Report.”
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 212 of 375 ends

RESOLUTION NO. 2022-49

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, DECLARING CITY’S INTENTION TO PROVIDE FOR AN

ANNUAL LEVY AND COLLECTION OF ASSESSMENTS FOR CERTAIN

MAINTENANCE IN AN EXISTING DISTRICT, AND SETTING A TIME AND PLACE FOR THE PUBLIC HEARING.

WHEREAS, the City Council of the City of Norco, California, desires to continue a Landscaping Maintenance District pursuant to the terms and provisions of the “Landscaping and Street Lighting Act of 1972,” being Division 15, Part 2 of the Streets and Highways Code of the State of California, known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 1 (BEAZER)
(hereinafter referred to as the “District”); and
WHEREAS, at this time, this City Council is desirous to provide for the annual levy of assessments for the territory within the District for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, at this time there has been presented and approved this City Council, the Engineer’s “Report” as required by law, and this City Council is desirous of proceeding with the proceedings for said annual levy.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, California, does resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

PUBLIC INTEREST
SECTION 2: That the public interest and convenience requires, and it is the intention of this City Council, to undertake proceedings for the annual levy and collection of special assessments for the continual maintenance of certain improvements, all to serve and benefit said District as said area is shown and delineated on a map as previously approved by this City Council and on file in the Office of the City Clerk, open to public inspection, and herein so referenced and made a part hereof, and proposed changes thereto are set forth in the “Report” of the Engineer, incorporated herein as a part hereof.

Page 213 of 375 ends

Resolution No. 2022-49 – LMD 1 (Beazer)

Page 2 ends

July 6, 2022
REPORT
SECTION 3: That the “Report” of the Engineer regarding the annual levy for said District, which “Report” is for maintenance for the Fiscal Year 2022-2023 is hereby approved and is directed to be filed in the Office of the City Clerk.

ASSESSMENT
SECTION 4: That the public interest and convenience requires, and it is the intention of this City Council to order the annual assessment levy for the District as set forth and described in said Engineer’s “Report,” and further it is determined to be in the best public interest and convenience to levy and collect annual assessments to pay the costs and expense of said maintenance and improvement as estimated in said “Report.”

DESCRIPTION OF MAINTENANCE
SECTION 5: The assessments levied and collected shall be for the maintenance of certain landscaping and street lighting improvements, as set forth in the Engineer’s “Report,” referenced and so incorporated herein.

COUNTY AUDITOR
SECTION 6: The County Auditor shall enter on the County Assessment Roll the amount of the assessments, and shall collect said assessments at the time and in the same manner as County taxes are collected. After collection by the County, the net amount of the assessments, after the deduction of any compensation due to the County for collection, shall be paid to the Treasurer for purposes of paying for the costs and expenses of said District.

SPECIAL FUND
SECTION 7: That all monies collected shall be deposited in a special fund known as:
“SPECIAL FUND, CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 1 (BEAZER)”
Payment shall be made out of said fund only for the purpose provided for in this Resolution, and in order to expedite the making of this maintenance and improvement, the City Council may transfer into said funds as it may deem necessary to expedite the proceedings. Any funds shall be repaid out of the proceeds of the assessments provided for in this Resolution.

Page 214 of 375 ends

Resolution No. 2022-49 – LMD 1 (Beazer)

Page 3 ends

July 6, 2022

BOUNDARIES OF DISTRICT
SECTION 8: Said contemplated maintenance work is, in the opinion of this City Council, of direct benefit to the properties within the boundaries of the District, and this City Council makes the costs and expenses of said maintenance chargeable upon a district, which district said City Council hereby declares to be the district benefited by said improvement said maintenance, and to be further assessed to pay the costs and expenses thereof. Said District shall include each and every parcel of land within the boundaries of said District, as said District is shown on a map as approved by this City Council and on file in the Office of the City Clerk, and so designated by the name of the District.

SECTION 9: NOTICE IS HEREBY GIVEN THAT ON JULY 20, 2022 AT THE HOUR OF 7 P.M., IN CITY COUNCIL CHAMBERS LOCATED AT 2870 CLARK

AVENUE, NORCO, CALIFORNIA, IS THE TIME AND PLACE FIXED BY THE CITY

COUNCIL FOR THE HEARING OF PROTESTS OR OBJECTIONS IN REFERENCE

TO THE ANNUAL LEVY OF ASSESSMENTS, TO THE EXTENT OF THE

MAINTENANCE, AND ANY OTHER MATTERS CONTAINED IN THIS RESOLUTION BY THOSE PROPERTY OWNERS AFFECTED HEREBY. ANY PERSONS WHO

WISH TO OBJECT TO THE PROCEEDINGS SHOULD FILE A WRITTEN PROTEST

WITH THE CITY CLERK PRIOR TO THE TIME SET AND SCHEDULED FOR SAID PUBLIC HEARING.

NOTICE
SECTION 10: The City Clerk is directed to publish this Resolution of Intention pursuant to Government Code Section 6061, said publication to be completed no later than ten days prior to the date set for the Public Hearing.

EFFECTIVE DATE
SECTION 11: This Resolution shall take effect immediately upon its adoption.

PROCEEDINGS INQUIRIES
SECTION 12: For any and all information relating to the proceedings, protest procedure, any documentation and/or information of a procedural or technical nature, your attention is directed to the below listed person at the local agency or department so designated:

Mr. Cody A. Howing, Assessment Engineer

CITY OF NORCO
2870 Clark Avenue
Norco, California 92860

Page 215 of 375 ends

Resolution No. 2022-49 – LMD 1 (Beazer)

Page 4 ends

July 6, 2022
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
_______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 216 of 375 ends

RESOLUTION NO. 2022-50

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, DECLARING CITY’S INTENTION TO PROVIDE FOR AN

ANNUAL LEVY AND COLLECTION OF ASSESSMENTS FOR CERTAIN

MAINTENANCE IN AN EXISTING DISTRICT, AND SETTING A TIME AND PLACE FOR THE PUBLIC HEARING.

WHEREAS, the City Council of the City of Norco, California, desires to continue a Landscaping Maintenance District pursuant to the terms and provisions of the “Landscaping and Street Lighting Act of 1972,” being Division 15, Part 2 of the Streets and Highways Code of the State of California, known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 2 (WESTERN PACIFIC) (hereinafter referred to as the “District”); and
WHEREAS, at this time, this City Council is desirous to provide for the annual levy of assessments for the territory within the District for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, at this time there has been presented and approved this City Council, the Engineer’s “Report” as required by law, and this City Council is desirous of proceeding with the proceedings for said annual levy.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, California, does resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

PUBLIC INTEREST
SECTION 2: That the public interest and convenience requires, and it is the intention of this City Council, to undertake proceedings for the annual levy and collection of special assessments for the continual maintenance of certain improvements, all to serve and benefit said District as said area is shown and delineated on a map as previously approved by this City Council and on file in the Office of the City Clerk, open to public inspection, and herein so referenced and made a part hereof, and proposed changes thereto are set forth in the “Report” of the Engineer, incorporated herein as a part hereof.

Page 217 of 375 ends

Resolution No. 2022-50 – LMD 2 (Western Pacific)

Page 2 ends

July 6, 2022
REPORT
SECTION 3: That the “Report” of the Engineer regarding the annual levy for said District, which “Report” is for maintenance for the Fiscal Year 2022-2023 is hereby approved and is directed to be filed in the Office of the City Clerk.

ASSESSMENT
SECTION 4: That the public interest and convenience requires, and it is the intention of this City Council to order the annual assessment levy for the District as set forth and described in said Engineer’s “Report,” and further it is determined to be in the best public interest and convenience to levy and collect annual assessments to pay the costs and expense of said maintenance and improvement as estimated in said “Report.”

DESCRIPTION OF MAINTENANCE
SECTION 5: The assessments levied and collected shall be for the maintenance of certain landscaping and street lighting improvements, as set forth in the Engineer’s “Report,” referenced and so incorporated herein.

COUNTY AUDITOR
SECTION 6: The County Auditor shall enter on the County Assessment Roll the amount of the assessments, and shall collect said assessments at the time and in the same manner as County taxes are collected. After collection by the County, the net amount of the assessments, after the deduction of any compensation due to the County for collection, shall be paid to the Treasurer for purposes of paying for the costs and expenses of said District.

SPECIAL FUND
SECTION 7: That all monies collected shall be deposited in a special fund known as:
“SPECIAL FUND, CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 2 (WESTERN PACIFIC)” Payment shall be made out of said fund only for the purpose provided for in this Resolution, and in order to expedite the making of this maintenance and improvement, the City Council may transfer into said funds as it may deem necessary to expedite the proceedings. Any funds shall be repaid out of the proceeds of the assessments provided for in this Resolution.

Page 218 of 375 ends

Resolution No. 2022-50 – LMD 2 (Western Pacific)

Page 3 ends

July 6, 2022

BOUNDARIES OF DISTRICT
SECTION 8: Said contemplated maintenance work is, in the opinion of this City Council, of direct benefit to the properties within the boundaries of the District, and this City Council makes the costs and expenses of said maintenance chargeable upon a district, which district said City Council hereby declares to be the district benefited by said improvement said maintenance, and to be further assessed to pay the costs and expenses thereof. Said District shall include each and every parcel of land within the boundaries of said District, as said District is shown on a map as approved by this City Council and on file in the Office of the City Clerk, and so designated by the name of the District.

SECTION 9: NOTICE IS HEREBY GIVEN THAT ON JULY 20, 2022 AT THE HOUR OF 7 P.M., IN CITY COUNCIL CHAMBERS LOCATED AT 2870 CLARK

AVENUE, NORCO, CALIFORNIA, IS THE TIME AND PLACE FIXED BY THE CITY

COUNCIL FOR THE HEARING OF PROTESTS OR OBJECTIONS IN REFERENCE

TO THE ANNUAL LEVY OF ASSESSMENTS, TO THE EXTENT OF THE

MAINTENANCE, AND ANY OTHER MATTERS CONTAINED IN THIS RESOLUTION BY THOSE PROPERTY OWNERS AFFECTED HEREBY. ANY PERSONS WHO

WISH TO OBJECT TO THE PROCEEDINGS SHOULD FILE A WRITTEN PROTEST

WITH THE CITY CLERK PRIOR TO THE TIME SET AND SCHEDULED FOR SAID PUBLIC HEARING.

NOTICE
SECTION 10: The City Clerk is directed to publish this Resolution of Intention pursuant to Government Code Section 6061, said publication to be completed no later than ten days prior to the date set for the Public Hearing.

EFFECTIVE DATE
SECTION 11: This Resolution shall take effect immediately upon its adoption.

PROCEEDINGS INQUIRIES
SECTION 12: For any and all information relating to the proceedings, protest procedure, any documentation and/or information of a procedural or technical nature, your attention is directed to the below listed person at the local agency or department so designated:

Mr. Cody A. Howing, Assessment Engineer

CITY OF NORCO
2870 Clark Avenue

Page 219 of 375 ends

Resolution No. 2022-50 – LMD 2 (Western Pacific)

Page 4 ends

July 6, 2022
Norco, California 92860
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
_______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
_____________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 220 of 375 ends

RESOLUTION NO. 2022-51

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, DECLARING CITY’S INTENTION TO PROVIDE FOR AN

ANNUAL LEVY AND COLLECTION OF ASSESSMENTS FOR CERTAIN

MAINTENANCE IN AN EXISTING DISTRICT, AND SETTING A TIME AND PLACE FOR THE PUBLIC HEARING.

WHEREAS, the City Council of the City of Norco, California, desires to continue a Landscaping Maintenance District pursuant to the terms and provisions of the “Landscaping and Street Lighting Act of 1972,” being Division 15, Part 2 of the Streets and Highways Code of the State of California, known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 3 (CENTEX)
(hereinafter referred to as the “District”); and
WHEREAS, at this time, this City Council is desirous to provide for the annual levy of assessments for the territory within the District for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, at this time there has been presented and approved this City Council, the Engineer’s “Report” as required by law, and this City Council is desirous of proceeding with the proceedings for said annual levy.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, California, does resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

PUBLIC INTEREST
SECTION 2: That the public interest and convenience requires, and it is the intention of this City Council, to undertake proceedings for the annual levy and collection of special assessments for the continual maintenance of certain improvements, all to serve and benefit said District as said area is shown and delineated on a map as previously approved by this City Council and on file in the Office of the City Clerk, open to public inspection, and herein so referenced and made a part hereof, and proposed changes thereto are set forth in the “Report” of the Engineer, incorporated herein as a part hereof.

Page 221 of 375 ends

Resolution No. 2022-51 – LMD 3 (Centex)

Page 2 ends

July 6, 2022
REPORT
SECTION 3: That the “Report” of the Engineer regarding the annual levy for said District, which “Report” is for maintenance for the Fiscal Year 2022-2023 is hereby approved and is directed to be filed in the Office of the City Clerk.

ASSESSMENT
SECTION 4: That the public interest and convenience requires, and it is the intention of this City Council to order the annual assessment levy for the District as set forth and described in said Engineer’s “Report,” and further it is determined to be in the best public interest and convenience to levy and collect annual assessments to pay the costs and expense of said maintenance and improvement as estimated in said “Report.”

DESCRIPTION OF MAINTENANCE
SECTION 5: The assessments levied and collected shall be for the maintenance of certain landscaping and street lighting improvements, as set forth in the Engineer’s “Report,” referenced and so incorporated herein.

COUNTY AUDITOR
SECTION 6: The County Auditor shall enter on the County Assessment Roll the amount of the assessments, and shall collect said assessments at the time and in the same manner as County taxes are collected. After collection by the County, the net amount of the assessments, after the deduction of any compensation due to the County for collection, shall be paid to the Treasurer for purposes of paying for the costs and expenses of said District.

SPECIAL FUND
SECTION 7: That all monies collected shall be deposited in a special fund known as:
“SPECIAL FUND, CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 3 (CENTEX)”
Payment shall be made out of said fund only for the purpose provided for in this Resolution, and in order to expedite the making of this maintenance and improvement, the City Council may transfer into said funds as it may deem necessary to expedite the proceedings. Any funds shall be repaid out of the proceeds of the assessments provided for in this Resolution.

Page 222 of 375 ends

Resolution No. 2022-51 – LMD 3 (Centex)

Page 3 ends

July 6, 2022

BOUNDARIES OF DISTRICT
SECTION 8: Said contemplated maintenance work is, in the opinion of this City Council, of direct benefit to the properties within the boundaries of the District, and this City Council makes the costs and expenses of said maintenance chargeable upon a district, which district said City Council hereby declares to be the district benefited by said improvement said maintenance, and to be further assessed to pay the costs and expenses thereof. Said District shall include each and every parcel of land within the boundaries of said District, as said District is shown on a map as approved by this City Council and on file in the Office of the City Clerk, and so designated by the name of the District.

SECTION 9: NOTICE IS HEREBY GIVEN THAT ON JULY 20, 2022 AT THE HOUR OF 7 P.M., IN CITY COUNCIL CHAMBERS LOCATED AT 2870 CLARK

AVENUE, NORCO, CALIFORNIA, IS THE TIME AND PLACE FIXED BY THE CITY

COUNCIL FOR THE HEARING OF PROTESTS OR OBJECTIONS IN REFERENCE

TO THE ANNUAL LEVY OF ASSESSMENTS, TO THE EXTENT OF THE

MAINTENANCE, AND ANY OTHER MATTERS CONTAINED IN THIS RESOLUTION BY THOSE PROPERTY OWNERS AFFECTED HEREBY. ANY PERSONS WHO

WISH TO OBJECT TO THE PROCEEDINGS SHOULD FILE A WRITTEN PROTEST

WITH THE CITY CLERK PRIOR TO THE TIME SET AND SCHEDULED FOR SAID PUBLIC HEARING.

NOTICE
SECTION 10: The City Clerk is directed to publish this Resolution of Intention pursuant to Government Code Section 6061, said publication to be completed no later than ten days prior to the date set for the Public Hearing.

EFFECTIVE DATE
SECTION 11: This Resolution shall take effect immediately upon its adoption.

PROCEEDINGS INQUIRIES
SECTION 12: For any and all information relating to the proceedings, protest procedure, any documentation and/or information of a procedural or technical nature, your attention is directed to the below listed person at the local agency or department so designated:

Mr. Cody A. Howing, Assessment Engineer

CITY OF NORCO
2870 Clark Avenue

Page 223 of 375 ends

Resolution No. 2022-51 – LMD 3 (Centex)

Page 4 ends

July 6, 2022
Norco, California 92860
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 224 of 375 ends

RESOLUTION NO. 2022-52

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, DECLARING CITY’S INTENTION TO PROVIDE FOR AN

ANNUAL LEVY AND COLLECTION OF ASSESSMENTS FOR CERTAIN

MAINTENANCE IN AN EXISTING DISTRICT, AND SETTING A TIME AND PLACE FOR THE PUBLIC HEARING.

WHEREAS, the City Council of the City of Norco, California, desires to continue a Landscaping Maintenance District pursuant to the terms and provisions of the “Landscaping and Street Lighting Act of 1972,” being Division 15, Part 2 of the Streets and Highways Code of the State of California, known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 4 (NORCO RIDGE RANCH) (hereinafter referred to as the “District”); and
WHEREAS, at this time, this City Council is desirous to provide for the annual levy of assessments for the territory within the District for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, at this time there has been presented and approved this City Council, the Engineer’s “Report” as required by law, and this City Council is desirous of proceeding with the proceedings for said annual levy.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, California, does resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

PUBLIC INTEREST
SECTION 2: That the public interest and convenience requires, and it is the intention of this City Council, to undertake proceedings for the annual levy and collection of special assessments for the continual maintenance of certain improvements, all to serve and benefit said District as said area is shown and delineated on a map as previously approved by this City Council and on file in the Office of the City Clerk, open to public inspection, and herein so referenced and made a part hereof, and proposed changes thereto are set forth in the “Report” of the Engineer, incorporated herein as a part hereof.

Page 225 of 375 ends

Resolution No. 2022-52 – LMD 4 (Norco Ridge Ranch)

Page 2 ends

July 6, 2022
REPORT
SECTION 3: That the “Reports” of the Engineer regarding the annual levy for said District, which “Reports” at three optional funding levels is for maintenance for the Fiscal Year 2022-2023 is hereby approved and is directed to be filed in the Office of the City Clerk.

ASSESSMENT
SECTION 4: That the public interest and convenience requires, and it is the intention of this City Council to order the annual assessment levy for the District as set forth and described in said Engineer’s “Reports,” and further it is determined to be which funding level is in the best public interest and convenience to levy and collect annual assessments to pay the costs and expense of said maintenance and improvement as estimated in said “Report.”

DESCRIPTION OF MAINTENANCE
SECTION 5: The assessments levied and collected shall be for the maintenance of certain landscaping and street lighting improvements, as set forth in the Engineer’s “Report,” referenced and so incorporated herein.

COUNTY AUDITOR
SECTION 6: The County Auditor shall enter on the County Assessment Roll the amount of the assessments, and shall collect said assessments at the time and in the same manner as County taxes are collected. After collection by the County, the net amount of the assessments, after the deduction of any compensation due to the County for collection, shall be paid to the Treasurer for purposes of paying for the costs and expenses of said District.

SPECIAL FUND
SECTION 7: That all monies collected shall be deposited in a special fund known as:
“SPECIAL FUND, CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 4 (NORCO RIDGE RANCH)” Payment shall be made out of said fund only for the purpose provided for in this Resolution, and in order to expedite the making of this maintenance and improvement, the City Council may transfer into said funds as it may deem necessary to expedite the proceedings. Any funds shall be repaid out of the proceeds of the assessments provided for in this Resolution.

Page 226 of 375 ends

Resolution No. 2022-52 – LMD 4 (Norco Ridge Ranch)

Page 3 ends

July 6, 2022

BOUNDARIES OF DISTRICT
SECTION 8: Said contemplated maintenance work is, in the opinion of this City Council, of direct benefit to the properties within the boundaries of the District, and this City Council makes the costs and expenses of said maintenance chargeable upon a district, which district said City Council hereby declares to be the district benefited by said improvement said maintenance, and to be further assessed to pay the costs and expenses thereof. Said District shall include each and every parcel of land within the boundaries of said District, as said District is shown on a map as approved by this City Council and on file in the Office of the City Clerk, and so designated by the name of the District.

SECTION 9: NOTICE IS HEREBY GIVEN THAT ON JULY 20, 2022 AT THE HOUR OF 7 P.M., IN CITY COUNCIL CHAMBERS LOCATED AT 2870 CLARK

AVENUE, NORCO, CALIFORNIA, IS THE TIME AND PLACE FIXED BY THE CITY

COUNCIL FOR THE HEARING OF PROTESTS OR OBJECTIONS IN REFERENCE

TO THE ANNUAL LEVY OF ASSESSMENTS, TO THE EXTENT OF THE

MAINTENANCE, AND ANY OTHER MATTERS CONTAINED IN THIS RESOLUTION BY THOSE PROPERTY OWNERS AFFECTED HEREBY. ANY PERSONS WHO

WISH TO OBJECT TO THE PROCEEDINGS SHOULD FILE A WRITTEN PROTEST

WITH THE CITY CLERK PRIOR TO THE TIME SET AND SCHEDULED FOR SAID PUBLIC HEARING.

NOTICE
SECTION 10: The City Clerk is directed to publish this Resolution of Intention pursuant to Government Code Section 6061, said publication to be completed no later than ten days prior to the date set for the Public Hearing.

EFFECTIVE DATE
SECTION 11: This Resolution shall take effect immediately upon its adoption.

PROCEEDINGS INQUIRIES
SECTION 12: For any and all information relating to the proceedings, protest procedure, any documentation and/or information of a procedural or technical nature, your attention is directed to the below listed person at the local agency or department so designated:

Mr. Cody A. Howing, Assessment Engineer

CITY OF NORCO
2870 Clark Avenue
Norco, California 92860

Page 227 of 375 ends

Resolution No. 2022-52 – LMD 4 (Norco Ridge Ranch)

Page 4 ends

July 6, 2022
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
_______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 228 of 375 ends

RESOLUTION NO. 2022-53

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, DECLARING CITY’S INTENTION TO PROVIDE FOR AN

ANNUAL LEVY AND COLLECTION OF ASSESSMENTS FOR CERTAIN

MAINTENANCE IN AN EXISTING DISTRICT, AND SETTING A TIME AND PLACE FOR THE PUBLIC HEARING.

WHEREAS, the City Council of the City of Norco, California, desires to continue a Landscaping Maintenance District pursuant to the terms and provisions of the “Landscaping and Street Lighting Act of 1972,” being Division 15, Part 2 of the Streets and Highways Code of the State of California, known and designated as:

CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 5 (HAWK’S CREST)
(hereinafter referred to as the “District”); and
WHEREAS, at this time, this City Council is desirous to provide for the annual levy of assessments for the territory within the District for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, at this time there has been presented and approved this City Council, the Engineer’s “Report” as required by law, and this City Council is desirous of proceeding with the proceedings for said annual levy.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco, California, does resolve, determine, and order as follows:

SECTION 1: That the above recitals are all true and correct.

PUBLIC INTEREST
SECTION 2: That the public interest and convenience requires, and it is the intention of this City Council, to undertake proceedings for the annual levy and collection of special assessments for the continual maintenance of certain improvements, all to serve and benefit said District as said area is shown and delineated on a map as previously approved by this City Council and on file in the Office of the City Clerk, open to public inspection, and herein so referenced and made a part hereof, and proposed changes thereto are set forth in the “Report” of the Engineer, incorporated herein as a part hereof.

Page 229 of 375 ends

Resolution No. 2022-53 – LMD 5 (Hawk’s Crest)

Page 2 ends

July 6, 2022
REPORT
SECTION 3: That the “Report” of the Engineer regarding the annual levy for said District, which “Report” is for maintenance for the Fiscal Year 2022-2023 is hereby approved and is directed to be filed in the Office of the City Clerk.

ASSESSMENT
SECTION 4: That the public interest and convenience requires, and it is the intention of this City Council to order the annual assessment levy for the District as set forth and described in said Engineer’s “Report,” and further it is determined to be in the best public interest and convenience to levy and collect annual assessments to pay the costs and expense of said maintenance and improvement as estimated in said “Report.”

DESCRIPTION OF MAINTENANCE
SECTION 5: The assessments levied and collected shall be for the maintenance of certain landscaping and street lighting improvements, as set forth in the Engineer’s “Report,” referenced and so incorporated herein.

COUNTY AUDITOR
SECTION 6: The County Auditor shall enter on the County Assessment Roll the amount of the assessments, and shall collect said assessments at the time and in the same manner as County taxes are collected. After collection by the County, the net amount of the assessments, after the deduction of any compensation due to the County for collection, shall be paid to the Treasurer for purposes of paying for the costs and expenses of said District.

SPECIAL FUND
SECTION 7: That all monies collected shall be deposited in a special fund known as:
“SPECIAL FUND, CITY OF NORCO
LANDSCAPING MAINTENANCE DISTRICT NO. 5 (HAWK’S CREST)”
Payment shall be made out of said fund only for the purpose provided for in this Resolution, and in order to expedite the making of this maintenance and improvement, the City Council may transfer into said funds as it may deem necessary to expedite the proceedings. Any funds shall be repaid out of the proceeds of the assessments provided for in this Resolution.

Page 230 of 375 ends

Resolution No. 2022-53 – LMD 5 (Hawk’s Crest)

Page 3 ends

July 6, 2022

BOUNDARIES OF DISTRICT
SECTION 8: Said contemplated maintenance work is, in the opinion of this City Council, of direct benefit to the properties within the boundaries of the District, and this City Council makes the costs and expenses of said maintenance chargeable upon a district, which district said City Council hereby declares to be the district benefited by said improvement said maintenance, and to be further assessed to pay the costs and expenses thereof. Said District shall include each and every parcel of land within the boundaries of said District, as said District is shown on a map as approved by this City Council and on file in the Office of the City Clerk, and so designated by the name of the District.

SECTION 9: NOTICE IS HEREBY GIVEN THAT ON JULY 20, 2022 AT THE HOUR OF 7 P.M., IN CITY COUNCIL CHAMBERS LOCATED AT 2870 CLARK

AVENUE, NORCO, CALIFORNIA, IS THE TIME AND PLACE FIXED BY THE CITY

COUNCIL FOR THE HEARING OF PROTESTS OR OBJECTIONS IN REFERENCE

TO THE ANNUAL LEVY OF ASSESSMENTS, TO THE EXTENT OF THE

MAINTENANCE, AND ANY OTHER MATTERS CONTAINED IN THIS RESOLUTION BY THOSE PROPERTY OWNERS AFFECTED HEREBY. ANY PERSONS WHO

WISH TO OBJECT TO THE PROCEEDINGS SHOULD FILE A WRITTEN PROTEST

WITH THE CITY CLERK PRIOR TO THE TIME SET AND SCHEDULED FOR SAID PUBLIC HEARING.

NOTICE
SECTION 10: The City Clerk is directed to publish this Resolution of Intention pursuant to Government Code Section 6061, said publication to be completed no later than ten days prior to the date set for the Public Hearing.

EFFECTIVE DATE
SECTION 11: This Resolution shall take effect immediately upon its adoption.

PROCEEDINGS INQUIRIES
SECTION 12: For any and all information relating to the proceedings, protest procedure, any documentation and/or information of a procedural or technical nature, your attention is directed to the below listed person at the local agency or department so designated:

Mr. Cody A. Howing, Assessment Engineer

CITY OF NORCO
2870 Clark Avenue

Page 231 of 375 ends

Resolution No. 2022-53 – LMD 5 (Hawk’s Crest)

Page 4 ends

July 6, 2022
Norco, California 92860
PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
_________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand affixed the official seal of the City of Norco, California, held on July 6, 2022.
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 232 of 375 ends

City Council

STAFF REPORT
Date: July 6, 2022 Agenda Item:

2.L.

To: Honorable Mayor and City Council Members
Prepared By: Chad Blais, Public Works Director
Department: Public Works
SUBJECT:

Amendment of FY 2023-2027 Capital Improvement Program (CIP) to include additional funding for the MDP Line N-1C Extension Storm Drain Project; and acceptance of bids and award of Contract for the MDP Line N-1C Extension Storm Drain Project RECOMMENDATION:

Adopt Resolution No. 2022-54 to increase FY 2023-2027 CIP storm drain funding in the amount of $241,000 for the MDP N-1C Extension Storm Drain project; Adopt Resolution No. 2022-55 to increase FY 2023-2027 CIP street improvement funding in the amount of $374,000 for the street work associated with the MDP Line N-1C Extension Storm Drain Project; Accept bids and award a contract to CEM Construction Corporation for the MDP Line N-1C Extension Storm Drain Project in the amount of $1,103,644; and authorize the City Manager to approve contract change orders up to 10 percent of the total bid amount.

SUMMARY:

Bids for the MDP Line N-1C Extension Storm Drain Project were opened on June 15, 2022, with CEM Construction Corporation of Montebello, California being the lowest responsible bidder. Therefore, it is recommended that a contract be awarded to CEM Construction Corporation in the amount of $1,103,644 and authorize the City Manager to approve contract change orders up to 10 percent of the total bid amount.

BACKGROUND:

Plans and specifications for the MDP Line N-1C Extension Storm Drain Project were advertised on May 23, 2022, with a bid opening date of June 15, 2022. A total of six (6) bids were received with proposals ranging in value from $1,103,644 to $2,062,619. The bid summary analysis has been attached for Council’s review (See Bid Summary). The MDP Line N-1C project includes the installation of 1,000 linear feet of various size RCP storm drain and catch basins. The project also includes street improvements necessary to direct runoff into the proposed storm drain system (See Project Exhibit).

Page 233 of 375 ends

Staff has reviewed all the bids submitted and determined that CEM Construction Corporation of Montebello, California as being the lowest responsible bidder in the amount of $1,103,644 (See Bid Proposal). Staff has reviewed the references of the lowest bidder and bid documents submitted and determined the bid is responsive to all requirements and the contractor has the experience to complete the required construction activities for the MDP Line N-1C Extension Storm Drain Project.

The MDP Line N-1C Extension Storm Drain Project has an approved construction budget of $485,000 (4214.37;129.935.43180 & 129.935.43180.30) for the storm drain portion of the project and $250,000 (4101.7;149.930.43160) for the street improvement portion of the project resulting in an overall budget amount of $735,000. The budget is insufficient to fund the low bid amount. Therefore, staff is recommending approval to amend the FY 2023-2027 CIP Budget to increase the project budget in the amount of $241,000 for the storm drain design and construction portion of the work and $374,000 for the street improvement work to ensure sufficient funding for the project ($1,214,009) to cover design costs, the full bid amount and a 10% contingency.

Funds for the storm drain portion of the project will be secured through a Funding Agreement with the Riverside County Flood Control & Water Conservation District (RCFC&WCD). Funding for the storm drain portion of the project includes 100% of the contract award amount, 100% of the design costs, 10% for design administration, 15% for construction contract administration and 10% for construction change orders. The Funding Agreement from RCFC&WCD will be approved by Council as a separate item.

FISCAL IMPACT:

The MDP Line N-1C Extension Storm Drain Project was approved as a Capital Improvement Program (CIP) project for Fiscal Year 2023-2027. Funds in the amount of $735,000 ($35,000 for design, $450,000 for storm drain construction and $250,000 for street construction) are included in the CIP Budget which is insufficient to fund the lowest bid amount. Approval of Resolution Nos 2022-54 and 2022-55 will appropriate an additional budget amount of $241,000 & $374,000, respectively, for construction, design and administrative costs to ensure sufficient funding for the project is available to cover the full bid amount and 10% contingency ($1,350,000). The additional costs beyond the project costs and 10% contingency for the project are for design, design administration and construction administration.

RELATIONSHIP TO STRATEGIC PLAN:

Construction of the MDP Line N-1C Extension Storm Drain Project is consistent with Strategic Direction #5 – Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Page 234 of 375 ends

Bid Summary
Project Exhibit
Bid Proposal
Resolution No. 2022-54
Resolution No. 2022-55
Contract -CEM

Page 235 of 375 ends

Company Name / Address BID
Kirtley Construction, Inc
dba TK Construction
P.O. Box 9608 $ 1,663,320.00
San Bernardino, CA 92427
Kana Pipeline, Inc.
12620 Magnolia Ave
Riverside, CA 92503 $ 2,062,619.00
Kay Construction Company, Inc.

PO Box 711432
Santee, CA 92072 $ 1,504,173.00
CEM Construction Corp
1412 Espanol Ave
Montebello, CA 90640 $ 1,103,644.00
Christensen Brothers General Engineering
PO Box 1286
Apple Valley, CA 92307 $ 1,177,570.70
GCI Construction Inc
1031 Calle Recodo, Suite D
San Clemente, CA 92673 $ 1,317,347.00
$ -
$ -
$ -
$ -
$ -
City of Norco
Norco MDP Lateral N-1C Extension Storm Drain
June 15, 2022 - 10:00 A.M.

Page 236 of 375 ends

BID SUMMARY SHEET
Norco MDP Lateral N-1C Extension
Storm Drain Project

BASE BID

ITEM QUANTITY UNITS DESCRIPTION UNIT BID TOTAL UNIT BID TOTAL UNIT BID TOTAL UNIT BID TOTAL

STORM DRAIN IMPROVEMENTS
1 1L
S
Clearing & grubbing, mobilization, NPDES/SWPPP requirements, general earthwork (max 3% of total base bid) $32,000.00 $32,000.00 $109,000.00 $109,000.00 $40,000.00 $40,000.00 $42,000.00 $42,000.00 2 1 LS Traffic Control $25,000.00 $25,000.00 $33,000.00 $33,000.00 $62,250.00 $62,250.00 $14,500.00 $14,500.003 7 EA Construct catch basin No.1 per RCFC & WCD Std. Dwg. No. CB100 & local depression no. 2 per RCFC & WCD Std. Dwg. NO LD201 case C, at $13,900.00 $97,300.00 $12,600.00 $88,200.00 $10,000.00 $70,000.00 $12,500.00 $87,500.00 4 370 LF
Construct 30" R.C.P. (see profile for D-load), includes trench backfill at, $355.00 $131,350.00 $350.00 $129,500.00 $445.00 $164,650.00 $470.00 $173,900.00 5 520 LF
Construct 24" R.C.P. (see profile for D-load), includes trench backfill at $322.00 $167,440.00 $280.00 $145,600.00 $385.00 $200,200.00 $450.00 $234,000.00 6 143 LF
Construct 18" R.C.P. (see profile for D-load) includes trench backfill at $300.00 $42,900.00 $330.00 $47,190.00 $470.00 $67,210.00 $326.00 $46,618.00 7 1E
A
Construct manhole No.1 per RCFC & WCD Std. No. MH251, at $12,000.00 $12,000.00 $11,600.00 $11,600.00 $8,800.00 $8,800.00 $9,500.00 $9,500.00 8 8LF
Remove existing 14"X23" elliptical R.C.P. ( see profile for D-load) includes trench backfill at $200.00 $1,600.00 $220.00 $1,760.00 $4,000.00 $32,000.00 $300.00 $2,400.00 9 1 EA
Construct catch basin No. 4 per RCFC & WCD Std. Dwg. No. CB101 & local depression No. 3 per RCFC & WCD Std. Dwg. No. DS202 case C $16,000.00 $16,000.00 $13,000.00 $13,000.00 $9,000.00 $9,000.00 $10,900.00 $10,900.00 10 576 LF
Remove & Replace existing horse trail fence per C.O.N. Std. Dwg. No. 706 $20.00 $11,520.00 $48.00 $27,648.00 $80.00 $46,080.00 $40.00 $23,040.00 Base Bid Total (Storm Drain): $537,110.00 $606,498.00 $700,190.00 $644,358.00

STREET IMPROVEMENTS
1 305 TON
Construct 1.5 C2 PG 64-10 or as required by soils engineer $150.00 $45,750.00 $164.00 $50,020.00 $154.00 $46,970.00 $112.00 $34,160.00 2 509 TON Construct 2.5" B PG 64-10 or as reqiured by soils engineer $150.00 $76,350.00 $160.00 $81,440.00 $149.00 $75,841.00 $112.00 $57,008.00 3 624 CY
Construct 6" of class II Aggregate base or as required by soils engineer. $80.00 $49,920.00 $70.00 $43,680.00 $84.00 $52,416.00 $121.00 $75,504.00 4 15 EA
Construct concrete driveway per city of Norco Std. 240 & Detail 3A or 3B on sheet 2 $3,900.00 $58,500.00 $5,000.00 $75,000.00 $4,000.00 $60,000.00 $6,800.00 $102,000.00 5 17 EA
Construct concrete driveway per City Of Norco Std. 245 & detail 4A or 4B on sheet 2 $3,400.00 $57,800.00 $5,000.00 $85,000.00 $4,000.00 $68,000.00 $6,500.00 $110,500.00 CEM Construction Corp. GCI Construction, Inc. Kay Construction Christensen Brothers General Engineering

Page 1 of 6 ends
Page 237 of 375 ends

BID SUMMARY SHEET
Norco MDP Lateral N-1C Extension
Storm Drain Project

BASE BID

ITEM QUANTITY UNITS DESCRIPTION

STORM DRAIN IMPROVEMENTS
1 1L
S
Clearing & grubbing, mobilization, NPDES/SWPPP requirements, general earthwork (max 3% of total base bid) 2 1 LS Traffic Control3 7E
A
Construct catch basin No.1 per RCFC & WCD Std. Dwg. No. CB100 & local depression no. 2 per RCFC & WCD Std. Dwg. NO LD201 case C, at 4 370 LF
Construct 30" R.C.P. (see profile for D-load), includes trench backfill at, 5 520 LF
Construct 24" R.C.P. (see profile for D-load), includes trench backfill at 6 143 LF
Construct 18" R.C.P. (see profile for D-load) includes trench backfill at 7 1 EA
Construct manhole No.1 per RCFC & WCD Std. No. MH251, at 8 8 LF
Remove existing 14"X23" elliptical R.C.P. ( see profile for D-load) includes trench backfill at 9 1 EA
Construct catch basin No. 4 per RCFC & WCD Std. Dwg. No. CB101 & local depression No. 3 per RCFC & WCD Std. Dwg. No. DS202 case C 10 576 LF
Remove & Replace existing horse trail fence per C.O.N. Std. Dwg. No. 706 Base Bid Total (Storm Drain):

STREET IMPROVEMENTS
1 305 TON
Construct 1.5 C2 PG 64-10 or as required by soils engineer 2 509 TON Construct 2.5" B PG 64-10 or as reqiured by soils engineer 3 624 CY
Construct 6" of class II Aggregate base or as required by soils engineer. 4 15 EA
Construct concrete driveway per city of Norco Std. 240 & Detail 3A or 3B on sheet 2 5 17 EA
Construct concrete driveway per City Of Norco Std. 245 & detail 4A or 4B on sheet 2

UNIT BID TOTAL UNIT BID TOTAL
$15,500.00 $15,500.00 $60,000.00 $60,000.00$21,000.00 $21,000.00 $59,000.00 $59,000.00$14,000.00 $98,000.00 $25,000.00 $175,000.00 $408.00 $150,960.00 $800.00 $296,000.00$370.00 $192,400.00 $570.00 $296,400.00$512.00 $73,216.00 $630.00 $90,090.00 $13,000.00 $13,000.00 $24,000.00 $24,000.00
$1,000.00 $8,000.00 $900.00 $7,200.00$9,000.00 $9,000.00 $26,000.00 $26,000.00 $39.00 $22,464.00 $57.00 $32,832.00
$603,540.00 $1,066,522.00
$150.00 $45,750.00 $141.00 $43,005.00$150.00 $76,350.00 $141.00 $71,769.00$110.00 $68,640.00 $107.00 $66,768.00 $12,000.00 $180,000.00 $11,000.00 $165,000.00$13,000.00 $221,000.00 $13,000.00 $221,000.00 Kana Pipeline, Inc. Kirtley Construction, Inc. dba TK Construction

Page 2 of 6 ends
Page 238 of 375 ends

BID SUMMARY SHEET
Norco MDP Lateral N-1C Extension
Storm Drain Project

BASE BID

ITEM QUANTITY UNITS DESCRIPTION UNIT BID TOTAL UNIT BID TOTAL UNIT BID TOTAL UNIT BID TOTAL CEM Construction Corp. GCI Construction, Inc. Kay Construction Christensen Brothers General Engineering 6 2,350 LF
Construct 6" curb & Gutter type C per City Of Norco Std. 200 $51.00 $119,850.00 $42.00 $98,700.00 $63.00 $148,050.00 $64.00 $150,400.00 7 33,716 SF Remove existing, AB & natural ground to required depth $3.00 $101,148.00 $2.80 $94,404.80 $2.50 $84,290.00 $9.00 $303,444.00 8 61 LF Sawcut existing pavement, $40.00 $2,440.00 $3.80 $231.80 $47.00 $2,867.00 $5.00 $305.00 9 122 SF Remove A.C. pavement (2' min) & join per detailon sheet 2 $35.00 $4,270.00 $8.00 $976.00 $33.00 $4,026.00 $50.00 $6,100.00 10 7 EA Remove & relocate existing mailboxes $300.00 $2,100.00 $900.00 $6,300.00 $1,700.00 $11,900.00 $100.00 $700.00 11 8 EA Remove exisiting curb stops, as needed for construction $500.00 $4,000.00 $320.00 $2,560.00 $775.00 $6,200.00 $75.00 $600.00 12 1 EA Remove & replace existing brick decorative pillar $3,500.00 $3,500.00 $12,000.00 $12,000.00 $9,200.00 $9,200.00 $2,500.00 $2,500.00 13 4 EA Adjust sewer manhole to grade per C.O.N. Std. Dwg. 535 $3,780.00 $15,120.00 $1,200.00 $4,800.00 $2,300.00 $9,200.00 $800.00 $3,200.00 14 8 EA Adjust water valve can to grade per C.O.N. Std. No. 470 $1,200.00 $9,600.00 $600.00 $4,800.00 $2,300.00 $18,400.00 $300.00 $2,400.00 15 2 EA
Re-install type E detector configuration per CalTrans Std. plan ES-5B $1,200.00 $2,400.00 $800.00 $1,600.00 $2,500.00 $5,000.00 $1,000.00 $2,000.00 16 1 EA
Re-install type D detector configuration per CalTrans Std. Plan ES-5B $1,270.00 $1,270.00 $800.00 $800.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 17 1 EA Adjust gas valve can to grade $1,500.00 $1,500.00 $620.00 $620.00 $2,300.00 $2,300.00 $300.00 $300.00 18 1,160 LF
Install yellow thermoplastic no passing zone line per Caltrans Std. plan A20A, detail 21 $8.00 $9,280.00 $4.40 $5,104.00 $4.00 $4,640.00 $4.00 $4,640.00 19 94 LF
Install 12" wide white thermoplastic limit/basic crosswalk line per Caltrans Std. plan A24F $10.00 $940.00 $24.00 $2,256.00 $18.00 $1,692.00 $24.00 $2,256.00 20 5 EA
Install blue retroflective hydrant marker per City Of Norco Std. Dwg. 430 $15.00 $75.00 $47.00 $235.00 $170.00 $850.00 $15.00 $75.00 21 117 LF
Install 6" solid white edge line per Caltrans Std. plan A20B, detail 27B $5.00 $585.00 $3.70 $432.90 $12.00 $1,404.00 $4.00 $468.00 22 17 LF
Install 8" solid white stripe at 30 degree & 40' spacing as shown $8.00 $136.00 $6.60 $112.20 $83.00 $1,411.00 $15.00 $255.00

Page 4 of 6 ends
Page 239 of 375 ends

BID SUMMARY SHEET
Norco MDP Lateral N-1C Extension
Storm Drain Project

BASE BID

ITEM QUANTITY UNITS DESCRIPTION
6 2,350 LF
Construct 6" curb & Gutter type C per City Of Norco Std. 200 7 33,716 SF Remove existing, AB & natural ground to required depth 8 61 LF Sawcut existing pavement,
9 122 SF Remove A.C. pavement (2' min) & join per detailon sheet 2 10 7 EA Remove & relocate existing mailboxes
11 8 EA Remove exisiting curb stops, as needed for construction 12 1 EA Remove & replace existing brick decorative pillar 13 4 EA Adjust sewer manhole to grade per C.O.N. Std. Dwg. 535 14 8 EA Adjust water valve can to grade per C.O.N. Std. No. 470 15 2 EA
Re-install type E detector configuration per CalTrans Std. plan ES-5B
16 1 EA
Re-install type D detector configuration per CalTrans Std. Plan ES-5B 17 1 EA Adjust gas valve can to grade
18 1,160 LF
Install yellow thermoplastic no passing zone line per Caltrans Std. plan A20A, detail 21 19 94 LF
Install 12" wide white thermoplastic limit/basic crosswalk line per Caltrans Std. plan A24F 20 5 EA
Install blue retroflective hydrant marker per City Of Norco Std. Dwg. 430 21 117 LF
Install 6" solid white edge line per Caltrans Std. plan A20B, detail 27B 22 17 LF
Install 8" solid white stripe at 30 degree & 40' spacing as shown

UNIT BID TOTAL UNIT BID TOTAL
Kana Pipeline, Inc. Kirtley Construction, Inc. dba TK Construction $75.00 $176,250.00 $77.00 $180,950.00
$5.50 $185,438.00 $6.00 $202,296.00
$23.00 $1,403.00 $22.00 $1,342.00$30.00 $3,660.00 $17.00 $2,074.00 $600.00 $4,200.00 $750.00 $5,250.00
$1,500.00 $12,000.00 $150.00 $1,200.00
$15,000.00 $15,000.00 $5,700.00 $5,700.00
$2,000.00 $8,000.00 $2,100.00 $8,400.00
$850.00 $6,800.00 $1,100.00 $8,800.00
$1,500.00 $3,000.00 $1,000.00 $2,000.00$1,500.00 $1,500.00 $1,100.00 $1,100.00$1,200.00 $1,200.00 $950.00 $950.00 $5.00 $5,800.00 $4.50 $5,220.00
$10.00 $940.00 $25.00 $2,350.00$23.00 $115.00 $40.00 $200.00 $2.00 $234.00 $4.00 $468.00
$2,500.00 $42,500.00 $15.00 $255.00

Page 5 of 6 ends
Page 240 of 375 ends

(PROPOSED) LAT N-1C EXTENSION LAT N-1C (EXISTING)

Page 241 of 375 ends

B|DDER’3 NAME; CEM CONSTRUCTION CORPORATION

CITY OF NORCO

PROPOSAL
FOR
NORCO MDP LATERAL N-1C EXTENSION STORM DRAIN PROJECT
TO CITY OF NORCO, as AGENCY:

In accordance with AGENCY’S “Notice Inviting Sealed Bids,” the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein.

BIDDER declares that this proposal is based upon careful examination of the work site, Specifications, Instructions to Bidders, and Contract Documents. If this proposal is accepted for award, BIDDER agrees to enter into a Contract with the AGENCY at the unit and/or lump sum prices set forth in the following Proposal Bid Sheet. BIDDER understands that failure to enter into a Contract in the manner and time prescribed will result in forfeiture to AGENCY of the Bid Bond accompanying this proposal.

BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Proposal Bid Sheet are solely forthe purpose of comparing bids, and that final compensation under the Contract will be based upon the actual quantities of work satisfactorily completed. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts. ’ BIDDER agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workman's compensation or to undertake seIf—insurance in accordance with the provisions ofthat code, and that the BIDDERwillcomply with such provisions of that code before commencing the performance of this Contract if awarded to it.

BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any Agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

P—1

Page 242 of 375 ends

BY
E-c,
PHONE; 323.597.1084
B|D[)ER's ADDRESS; 1412 Espanol Avenue
BIDDER declares in the attached Non-Collusion Affidavitthat the only persons or parties interested in this proposal as principals are those named therein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal‘ is made without connection to any other individual, firm, or corporation making a bid for the same work; and that this proposal is in all respects fair and without collusion or fraud.

BIDDER certifies that affirmative action has been taken to seek out and consider disadvantaged business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been carefully documented, that said documentation is open to inspection, and that said affirmative action willremain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the Contract Documents.

DATED: , 2022 BIDDER: CEM Construction Cor oration
P—
Montebello, CA 90640
Ma
TITLE; President

Page 243 of 375 ends

B|DDER'S INFORMATION
BIDDERcertifies that the following information is true and correct:

Bidder's Name:

CEM Construction Corporation
Business Address:
1412 Espanol Avenue
Montebello, CA 90640
Telephone:
323.597.1084
State Contractor's License No. and Class: 951234 Class A, B, C-8, C-12, C-21, C-27 Orioinal Date Issued: 8/16/2010 Expiration Date: 8/31/2022 The following are the names, titles, addresses, and phone numbers of all individuals, fir members, partners, joint venturers, and/or corporate officers having a principal interestmin this proposal:

Jesus E. Carrillo - President / Treasurer
Emigdio Carrillo — Vice President / Secretary
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows:

N/A
Allcurrent and prior DBA's, alias, and/orfictitious business names for any principal having an interest in this proposal are as follows:

N/A
P-3

Page 244 of 375 ends

Signature of Owner:

Business:

VCONTRACTOR'SLICENSING STATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.

Contractor's License Number: 951234 C|aSSI A, B, C-8.C-12.C-21.C-27 Nam of Individual Contractor (Print or Type)’
Name: N Title
Address:

Name:

Address or Name of Corporation: CEM Construction Cor oration Business Address; 1412 Espanoi Ave., Montebello, CA 90640 Corporation organized under the laws of the State of California Address or Name of Firm
" Business
Signature of President of Corporatior
ature of Secretary of Corporation

Page 245 of 375 ends

SUBCONTRACTOR LIST
In compliance with the provisions of the Public Contract Code Section 4104, the undersigned bidder herewith sets forth the name, location of the place of business, and California contractor license of each Subcontractor who will perform work or labor or render service to the Prime Contractor specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half (1/2) of one percent (1%) of the General Contractor’s total bid amount or, in the case of bids or offers for the construction of streets or highways, including bridges in excess of one—halfof 1 percent (0.5%) of the Prime Contractor's total bid or ten thousand dollars ($10,000), whichever is greater, and the portion of the work which will be done by each Subcontractor Name Under Specific
Which Sub Description of % of
Contractor is License DIR Address of Sub Contract Total Licensed Number Number Office Work Bid
,z«.~.‘«-$52 aoo<>oooo'z4. :2 W4 c:.«o(¢ 9.5-?’I44,l1 upwr Mm HN??€« an -forcsk<4\‘$2550 7.26", W, ‘Pro!-e£63a~vaF ?¢mu=r -669%-“-*='+5‘i' Hair: $4-‘523%: Ne. -Lu. La.?aaw,-£2ax
-r\,.. \<.. Laces $2456 toooommq 445 s.émmu 9, T; —.cLaa(>5 évaoklillx lac, Kmlaeiwt CA‘I260 .Z5 é/0
Lapol(?nd?-uoéxcmlac. 3<0‘$5"\ l0°"°I‘>8<(o 2125 Z. 0" . ${-we-kmsr, ’ CoronaCA 2862 550%
*CAn-lfmsédt On W Ifthe bidder fails to specify a Subcontractor for any portion of the work, the bidder agrees to perform the work with his own crews. (Alternative Subcontractors for the same work are prohibited by provisions of the California Government Code.) An inadvertent error in listing the California contractor license number provided pursuant to paragraph (1) shall not be grounds forfiling a bid protest or grounds for considering the bid nonresponsive ifthe corrected contractor's license number is submitted to the public entity by the prime contractor within 24 hours after the bid opening and provided the corrected contractor's license number corresponds to the submitted name and location for that subcontractor
CEM Construction Corporation
Dated Bidder
P—
Signature
ignatu re

Page 246 of 375 ends

NAME: Hardy and Harper, Inc.

LICENSENo.: 215952
DIR No.: 1000000076
ADDRESS: 32 Ranch Circle, Lake Forest, CA92630
TYPEOF WORK: Asphalt
PERCENTOF TOTAL BID:

NAME: Traffic Loops Crackfilling, Inc.

LICENSENo.: 652956
DIR No.: 1000003794
ADDRESS: 946 S. Emerald Street, Anaheim, CA 92804
TYPEOF WORK: Traffic Loops
PERCENTOF TOTAL BID: 26%
NAME: Lopez Construction, Inc.

LICENSENo.: 890389
DIRNo.: 1000017840
ADDRESS: 1125 E. 5”‘St., Corona, CA92881
TYPEOF WORK: Structures
PERCENTOF TOTAL BID:

NAME: EBS
LICENSENo.: 720016A
DIR No.: 1000005295
ADDRESS: 1345 Quarry Street, #101, Corona, CA92879
TYPEOF WORK: Concrete

PERCENTOF TOTAL
6;

Page 247 of 375 ends

9 Primrose Park Project — City of Temple City
Okan Demirci, 9701 Las Tunas Dr., Tem le Cit , CA 91780 - 714.319.6137

REFERENCES
The following are the names, addresses, and phone numbers for three public agencies for which BIDDER has performed similar work within the past two years:

Jasmine Street Storm Drain Improvements - City of Laguna Beach Matthew Oxford, 505 Forest Avenue., Laguna Beach, CA 92651 - 949.497.0792

DESIGNATION OF SURETIES
The following are the names, addresses, and phone numbers for all brokers and sureties from whom BIDDER intends to procure insurance and bonds:

SURETY: U.S. S ecialt Insurance Com an
13403 Northwest Freeway, Houston, TX 77040 - 713.462.1000 Perris March Plaza, Utilities — Rockwood Construction / Cit of Perris ins ectin a ency) Alex Sanchez, 33302 Valle Road, Ste. 125, San Juan Capistrano, CA 92675 — 949.423.4784 151 Kalmus Dr., Suite A201, Costa Mesa, CA 92626 — 714.546.5100 AGENT: Alliant Insurance Services, Inc.

Page 248 of 375 ends

CITYOF NORCO

BID BOND
FOR
NORCO MDP LATERAL N-1C EXTENSION STORM DRAINPROJECT
KNOW ALL MEN BY THESE PRESENT that CEM Construction Corporation , as BIDDER, and
U.S. Specialty Insurance Compan as
SURETY, are held and firmly bound unto THE CITY OF NORCO, as AGENCY, in the penal sum
of Ten percent of Total Bid Amount dollars
($ 10% ofTota|BidAmount ), which is 10 percent of the total amount bid by BIDDER to AGENCY for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONSOF THIS OBLIGATIONARE SUCH that, whereas BIDDERis about to submit a bid to AGENCY for the above stated project, ifsaid bid is rejected, or ifsaid bid is accepted and a contract is awarded and entered into by BIDDERin the manner and time specified, then this obligation shall be null and void, othen/vise itshall remain in full force and effect in favor of AGENCY.

WITNESS our hands this day of June , 2022.
(seal)
CEM Construction Corporation

CONTRACTOR
(CORPORATION) TY
By:
_President
By:
10 NOTE: SIGNATURE OF CORPORATE OFFICIALS MUST BE NOTARIZED Subscribed and sworn to before me this day of
Sec Laryffreasurer
Seal of Notary:

Notary Pu li
-. . ALEXANDRA AMPAROESTRAD
3;' " *4 Notary Public - Califotnia A
: Los Angeles County
' __CommissionIf 2264439
' ° My Cumm.Expires Oct 26, 2022
IVNN P-7

Page 249 of 375 ends

Mailing’ ‘Address: 13403 Northwest Freeway Houston, TX 77040 BIDBOND (PAGE 2)
Vanessa Copeland
Nam
Signature‘
Title. Attorney—in-Fact
NOTE: SIGNATURE OF SURETY MUST BE NOTARIZEDI
Subscribed and sworn to before me
this _ day of ,
P
Seal of Notary‘
Notary Public
SU-RETY»S.NAME_-I-YPEZ U.S. Specialty Insurance Company (seal)

Page 250 of 375 ends

State of California
County 0 Oral“ e
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE 1189
A notary public or other officer completing this certi?cate veri?es only the identity of the individual who signed the docu111e11t to which this certi?cate is attached a11dnot the truthfulness, accuracy, or validity of that document. s a:
'- USAPELLERITO
Notary Public - California
OrangeCounty
Commission4 2383234
g??-d??-'
IVNNKD’-‘£
before me, Lisa Pellerito , Notary Public,
personally appeared Vanessa C0P9l3nd
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in l‘I‘l'S/l‘l€I‘/t‘l‘l'C'lI‘ authorized capacity(r'es), and that by lrisfher/their signature(»s-) on the instrument the person(s)._ or the entity upon behalf of which the person(s-) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.

WITNESS my and and of?cial se 1.

Signature:

Sign tire of Notary Public
----—--------——------------------—------—----- OPTIONAL --- ------------------ --------- ---------- —- Though the information below is not required by law, it may prove valuable to persons relying on the document and could present fraudulent and reattachment of this form to another document.

Description of Attached Document
Type or Title of Document:

Document Date: Number of Pages:

Signer(s) Other Than Named Above:

Capacity(ies) Claimed by Signer(s) Capacity(ies) Claimed by Signer(s) Signer"s Name: Vanessa C0P9l3“d Signer‘s Name:

I: Individual I: Individual
I: Corporate Officer — Title(s): :I Corporate Officer — Title(s):

I: Partner: |___lLimited General : Partner: I:ILimited[: General [Z Attorney in Fact : Attorney in Fact
I: Trustee __ Trustee
I: Guardian or Conservator _ Guardian or Conservator
I: Other: _ Other:

Signer Is Representing: Signer Is Representing:

Rev. 1 15
lace Notary Seal Above
Name(s) of Siguer(s)
\©’} On

Page 251 of 375 ends

KNOWALL
T_.°.__K1;, .°M13_‘.11i.§
H C C

POWER OF ATTORNEY
;]_'ORSlNDEl\llNl MBA” Ul3_fETYCOMPA 2
MEN BYT SE SE :TS:£That American Contrac o s In emtyCompany, a C Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the “Companies”), do by these presents make, constitute and appoint:

Eric Lowey, MarkRichardson, Kevin Cathcart, Jennifer Grenrood, Vanessa Copeland, Natassia Kirk-Smith, or Mike Castaneda of Costa Mesa, California its true and lawfulAttorney(s)-in-fact, each in their separate capacity if more than one is named above, with fullpowerand authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond penalty does not exceed *****TenMillion***** Dollars '
' on January 313‘,2024 Th’ f Attorney is
” Directors ” ‘P "
2 I en I nt, any Assistan - en _ n —retaryor any A,
vested with full power and%authorrty=foappoint any one or more suitable persons as*Attorney(s)-in-Fact to rep_r_esent—and’ Company subject to the following provisions:

Attomey-in-Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and allbonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or ?nal estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as ifsigned by the President and sealed and effected by the Corporate Secretary.

Be it Resolved, that the signature of any authorized of?cer and seal of the Company heretofore or hereafter af?xed to any power of attorney or any certi?cate relating thereto by facsimile, and any power of attorney or certi?cate bearing facsimile signature or facsimile seal shall be validand binding upon the Company with respect to any bond or undertaking to which it is attached.

Intom::Q. 5. :-Qm0'
actfor and on behalf of the
lN,WlNESSWHEREOF, The Companies ave caused this instrument to bes_i ed and their corporate seals to be eretoaf?xed, this September»——20EL’l
State of California
County of Los Angeles it _, ~ 7, _
- y:
‘ “,,,,,,,,t‘«’«» *’6,,g,",r~;“3,'§f,.or“' %"u..,,,,Wj,,..~*, 2 sway Daniel P. Aguilar, Vice President A Notary Public.orotherof?cer completing this certificate veri?es only the identity of the individualwhosignedthe document to which this certi?cate is attached, and not the truthfulness, accurac , or validi of that document On this 23rd day of September, 2021, before me, D. Little?eld, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, UnitedStates Surety Company and U.S. Specialty insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrumentand acknowledgedvtggmeith e executed the same in his au ized capacity, and th by_:' ' natureon the —rstme and correct.

O;'U'l'|'I.£Fl£LD
H.otLa°z,y'Puelrc - Canton-u.

Anselncnu ‘ .CotVtntisslon.)"2J23t3y('t7
.3*!(Own. Eatalrégup, .31,-may
WITNESS my hand and of? ' lseal.
if A- k (seal)
I, KioLo, Assistant Secretary o American Contractors Indemnity Company, Texas Bonding Companil:United‘StatesSurety Company and U.S. Specialty insurance Company, do hereby certify that the above and foregoing isa true and correct copy of a Power of Attorney, executed by said Companies, which is stillin fullforce and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are infullforce and effect.

Signature
,‘.'.:' .l ',,
have hereuntoset m hand and affixed the seals of said Companies at this Bond No.

Agency No_ 18200 KioLo, Assi Secretary
HCCSMANPOA09l2021
visit tmhcc.com/surety for more information
‘DPJU2 Los Angeles, California

Page 252 of 375 ends

NON-COLLUSION DECLARATION
(TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID)
The undersignegévdeclaresz
«V L’
l &President CEM COHSIFUCIIIOIT COTPOFBIZIOH,
foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, orthe contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
-Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of Californiathatthe foregoing is true and correct and that this declaration is executed on /‘/ [date], at Montebello [city], California [state].

P-9

Page 253 of 375 ends

‘FEM! «La,» ((
l">,4oo 47 [$00
T‘”“"‘l"{ rm"b’\N5/ax.‘ Jd?crs 2 $600

CITY OF NORCO
PROPOSAL BID SHEET (Storm Drain)
FOR
NORCO MDP LATERAL N-1C EXTENSION STORM DRAIN PROJECT

DESCRIPTION OF ITEMS UNIT

ITEM QUANTITY UNIT WITH UNIT PRICE WRITTEN PRICE IN TOTAL

INWORDS FIGURES
Clearing and Grubbing,
Mobilization,NPDES/SWPPP
requirements, General
Earthwork (max 3% of total $ $ base bid) at
Per Each
Traffic Control, at
Per Each
Construct Catch Basin No. 1 per
RCFC &WCD Std. Dwg. No.

CB100 and Local Depression
No. 2 per RCFC &WCD Std. $ $ Dwg. No LD201 Case C, at
Per Each
Construct 30” R.C.P. (See
Profile for D—Load),includes
trench backfill at
LF $
Per

3.12. SSS 131,
Linear
P-10
—Qacd$a:J Nag Lruvd
C1
32,ooo ‘$2.

Page 254 of 375 ends

T5»--u. ?'wn.1s-qjatoms Boo qlaqét)
1''’ M1 -1-no 327. 157,

DESCRIPTION OF ITEMS UNIT

ITEM QUANTITY UNIT WITH UNIT PRICE WRITTEN PRICE IN TOTAL

IN WORDS FIGURES
Construct 24" R.C.P. (See
Profile for D-Load), includes
trench backfiii at
520 LF $
Per
Linear Foot
Construct 18” R.C.P. (See
Profile for D-Load), includes
trench backfiii at
LF $
Per
1,
Tw?éw -L‘-u.>$r.«9 o?atlcys 12,000 /2,600
§=>¢»1ec»:—1*»u)md[lama
(5.060 lz..

EA
LF
EA
Linear Foot
Construct Manhole No. 1 per
RCFC& WCD Std. No. MH251,
at
Per Each
Remove existing 14”x23”
elliptical R.C.P. (See Profile for
D—Load),includes trench backfill
at at
Per
Linear Foot
Construct Catch Basin No. 4 per
RCFC&WCD Std. Dwg. No.

CB101 and Local Depression
No. 3 per RCFC &WCD Std.

Dwg. No. D8202 Case C, at
Per
$
$
P-11
143

Page 255 of 375 ends

hand 45W 5!«J0n.<. .J»¢Jlc./hl $

DESCRIPTION OF ITEMS UNIT

ITEM QUANTITY UNIT WITH UNIT PRICE WRITTEN PRICE IN TOTAL

IN WORDS FIGURES
Remove and replace existing
horse trail fence per C.O.N. Std.

Dwg. No. 706, at
Cm (
CEM Construction Corporation
323.597.1084
Bidder’s Name and Telephone Number
NOTE: The unit price must be written in words and also shown in figures. The total price must be extended for each item of work, and the total of all items inserted in the space provided.

BASE BID TOTAL AMOUNT (Storm Drain)

BASE BID TOTAL AMOUNT INWORDS
$37
576 L

Page 256 of 375 ends

/50 75,

CITY OF NORCO
PROPOSAL BID SHEET (Street)
FOR
‘H420
Twaélwsal Mm 330° 52.
/50 76,380
3 ,'-(oo 57,300
NORCO MDP LATERAL N-1C EXTENSION STORM DRAINPROJECT

DESCRIPTION OF ITEMS UNIT

ITEM QUANTITY UNIT WITH UNIT PRICE WRITTEN PRICE IN TOTAL

INWORDS FIGURES
Construct 1.5” C2 PG 64-10 or
as required by S ils En ineer,

1. 305 Ton at $ $
Per Ton
Construct 2.5” B PG 64-10 or as
required by Soils gineer,
509 Ton at $
Per Ton
Construct 6” of Class II
Aggregate Base or as required
by Soils Engineer,

3. 624 CY at $ $
Per Cubic
Yard
Construct concrete driveway per
City of Norco Std. 240 and
Detail 3A or 3B on Sheet 2, at 4 15 EA $ $
Per Each
Construct concrete driveway per
City of Norco Std. 245 and
5 17 EA Detail 4A or 4B on Sheet 2, at $ $
Per Each
P-13

Page 257 of 375 ends

L’: 4% 61
‘$.00 I01,14
Sl.oL> W1’, 83?
61 42¢
?/ 2 w‘((70
‘mu ltwngiwcd
TL»:

Soc ‘'1,000
3,300 ">.Sf>
-Fax;-elm Juli
Per Each
Remove and replace existing
brick decorative pillar, at
EA

ITEM QUANTITY UNIT
2,350
33,716
122
LF
SF
LF
SF
EA
EA

DESCRIPTION OF ITEMS

WITH UNIT PRICE WRITTEN

INWORDS
Construct 6” curb and gutter
Type C per City of Norco Std.
200, at
Per
Linear Foot
Remove Existing pavement, AB,
and natural ground to required
depth, at
Per
Square Foot
Sawcut existing pavement, at
Per
Linear Foot
Remove A.C. pavement (2’
min.) and join per detail on
sheet 2, at
Per
Square Foot
Remove and relocate existing
mailboxes, at
Per Each
Remove existing curb stops, as
needed for construction, at
UNIT

PRICE IN

FIGURES
TOTAL
Per Each
P-14
10 2, 200
Thu

Page 258 of 375 ends

674, mm «Loolmdwd 1.100 ‘moo
Tmw?wwsaw LtuwJVtt§ Sim, I3.I20

6. DESCRIPTION OF ITEMS UNIT

ITEM QUANTITY UNIT WITH UNIT PRICE WRITTEN PRICE IN TOTAL

IN WORDS FIGURES
Adjust sewer manhole to grade
per C.O.N. Std. Dwg. No. 535,
4 EA at $

3.06 5%4Hco$6v_9 Mo (4u»g‘lL¢J datlas
UM.-lhwsmi
-LaoMJKJ (Looms
G444mw Cmmm
[1200
/1§0f> 1-,.S00

15. 16.
1160
EA
EA
EA
EA
LF
Adjust water valve can to grade
per C.O.N, Std. No. 470, at
Per Each
Re—instal| Type E Detector
Configuration per Ca|Trans Std
Plan ES—5B,at
Per Each
Re-install Type D Detector
Configuration per CalTrans Std.

Plan ES—5B,at
Per Each
Adjust gas valve can to grade,
at
Per Each
Install Yellow Thermoplastic no
passing zone line per Caltrans
STD plan A2OA, detail 21, at
Per
P-15

18. 13.
‘I4.

Per

Page 259 of 375 ends

“"‘%a>x~<mM«J *4/aw
/goo 75.00
134.
§.oo ")$.0()

DESCRIPTION OF ITEMS

ITEM QUANTITY UNIT WITH UNIT PRICE WRITTEN
94 117
LF
EA
LF
LF

IN WORDS
Install 12” wide white
thermoplastic limit/basic
crosswalk line per Caltrans
STD. plan A24F, at
Per Each
Install blue retroflective hydrant
marker per City of Norco STD.

DWG. 430, at
Per Each
Install 6" solid white edge line
per Caltrans STD. plan A2OB,
detail 27B, at
Per Each
Install 8” solid white stripe at 30°
and 40' spacing as shown, at
UNIT

PRICE IN

FIGURES
TOTAL
CW6-M “MA. «Igor
Séé s'~'s=(.co
BASE BIDTOTAL AMOUNT (Street)

BASE BID TOTAL AMOUNT IN WORDS
P-16
Per Each

22. 21

19. Mar
(QM do?las

Page 260 of 375 ends

,-rL_ («ya-nJy_J.

CEM Construction Corporation
323.597.1084
Bidder's Name and Telephone Number
NOTE: The unit price must be written in words and also shown in figures. The total price must be extended for each item of work, and the total of all items inserted in the space provided.

BASE BID TOTAL AMOUNT (Storm Drain and Street)
/’oL.;.l1vz5néc 1 ~(6ma«U\4.osg,..J s
(MMyqéféd (
Subscribed and sworn to this day of JUHG , 2022.

CEM Construction Corporation
323.597.1084
Bidder’s Name and Telephone Number
NOTE: The unit price must be written in words and also shown in figures. The total price must be extended for each item of work, and the total of all items inserted in the space provided.

INWITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all forenamed principals this day of June , 2022.

B|D[)ER CEM Construction Corporation
Jesus E. Carrillo — President / Treasurer
Emi dio Carrillo - Vice President / Secreta

BASE BID TOTAL AMOUNT INWORDS
Z [03 QM.60

Page 261 of 375 ends

NOTARY PUBLIC
BY
Title
AGENCY acknowledges that this proposal was received and opened at the time and i the place specified, and that itwas accompanied by the required guarantee in the amountn of 10 percent of the total bid.
. ALEXAND
NotaryL05

RAAMPAROESTRADA
Public- Camornia
Angeles County
'
' #2164439
' esOct 26. 7.022
2 P-18
Title

Page 262 of 375 ends

RESOLUTION NO. 2022-54

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, AMENDING THE FISCAL YEARS 2023-2027 CAPITAL

IMPROVEMENT PROGRAM (CIP) BUDGET TO INCLUDE ADDITIONAL
STORM DRAIN FUNDS FOR THE NORCO MDP LINE N-1C EXTENSION

STORM DRAIN PROJECT
WHEREAS, the Fiscal Years 2023-2027 Capital Improvement Program (CIP) Budget for the City of Norco, California was adopted by the City Council on June 15, 2022; and
WHEREAS, there is a need to amend the CIP Budget to incorporate additional funds for the FY 2023-2027 Capital Improvement Program Budget; and WHEREAS, the requested amendment includes the addition of $241,000 for the storm drain portion of work for the MDP Line N-1C Extension Storm Drain Project; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco at a regular meeting held on July 6, 2022 approved the amendment to the Capital Improvement Program for Fiscal Years 2023-2027 to include additional funds of $241,000 totaling $726,000 for the storm drain portion of the work for MDP Line N-1C Extension Storm Drain Project.

PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022
______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 263 of 375 ends

Resolution No. 2022-54 – Amend FY 2023-2027 for Storm Drain Funds

Page 2 ends

July 6, 2022
I, Dana Roa, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California, on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 264 of 375 ends

RESOLUTION NO. 2022-55

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, AMENDING THE FISCAL YEARS 2023-2027 CAPITAL

IMPROVEMENT PROGRAM (CIP) BUDGET TO INCLUDE ADDITIONAL
STREET FUNDS FOR THE NORCO MDP LINE N-1C EXTENSION

STORM DRAIN PROJECT
WHEREAS, the Fiscal Years 2023-2027 Capital Improvement Program (CIP) Budget for the City of Norco, California was adopted by the City Council on June 15, 2022; and
WHEREAS, there is a need to amend the CIP Budget to incorporate additional funds for the FY 2023-2027 Capital Improvement Program Budget; and WHEREAS, the requested amendment includes the addition of $374,000 for the street improvement portion of the MDP Line N-1C Extension Storm Drain Project; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Norco at a regular meeting held on July 6, 2022 approved the amendment to the Capital Improvement Program for Fiscal Years 2023-2027 to include additional funds of $374,000 totaling $624,000 for the street improvement portion of the work for MDP Line N-1C Extension Storm Drain Project.

PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held on July 6, 2022.
______________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 265 of 375 ends

Resolution No. 2022-55 – Amend CIP 2023-2027 to add Street Funding

Page 2 ends

July 6, 2022
I, Dana Roa, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on July 6, 2022, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California, on July 6, 2022.
________________________
Dana Roa, CMC, City Clerk
City of Norco, California

Page 266 of 375 ends

CA-1

CITY OF NORCO
NORCO MDP LINE N-1C EXTENSION STORM DRAIN PROJECT

AGREEMENT

1. Parties and Date.

This Agreement is made and entered into this 6th day of July, 2022 by and between the City of Norco, a municipal corporation of the State of California, located at 2870 Clark Avenue, Norco, California 92860, County of Riverside, State of California, (hereinafter referred to as “City”) and CEM Construction Corporation, a corporation with its principal place of business at 1412 Espanol Avenue, Montebello, CA 90640 (hereinafter referred to as “Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.

2. Recitals.

2.1 Contractor.

Contractor desires to perform and assume responsibility for the provisions of the MDP Line N-1C Extension Storm Drain Project on the terms and conditions set forth in this Agreement. Contractor represents that it is experienced in constructing storm drain and street improvements for public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that is familiar with the plans of the City.

2.2 Project.

The City desires to engage the Contractor to render such services for the MDP Line N-1C Extension Storm Drain Project (“Project”) as set forth in this Agreement.

3. Terms.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to construct the improvements outlined by the Project. The Project is more particularly described in Exhibit A attached hereto and incorporated herein by reference. The Project shall be subject to, and performed in accordance with this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The terms of this Agreement shall begin at the Notice to Proceed and shall extend 60 working days. Contractor shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines.

3.2 Responsibilities of Contractor.

3.2.1 Control and Payment of Subordinates; Independent Contractor. The Project shall be constructed by Contractor or under its supervision. Contractor will determine the

Page 267 of 375 ends

CA-2
means, methods and details of constructing the Project subject to the requirements of this Agreement. City retains Contractor on an independent contractor basis and not as an employee.

Any additional personnel constructing the Project under this Agreement on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with the construction of the Project under this Agreement and as required by law.

Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation insurance.

3.2.2 Schedule of Services. Contractor shall construct the Project expeditiously, within the term of this Agreement, and in accordance with the Project timeframe set forth herein.

Contractor represents that it has the professional and technical personnel required to construct the Project in conformance with such conditions. In order to facilitate Contractor’s conformance with the Project timeframe, City shall respond to Contractor’s Requests for Information in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Project timeframe.

3.2.3 Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City.

3.2.4 City’s Representative. The City hereby designates the Director of Public Works, or his designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Agreement. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.2.5 Contractor’s Representative. Contractor hereby designates Jesus Carillo–President, or his designee, to act as its representative for the performance of this Agreement (“Contractor’s Representative”). Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement. The Contractor’s Representative shall supervise and direct the Project, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Project under this Agreement.

3.2.6 Coordination of Project. Contractor agrees to work closely with City staff in the construction of the Project and shall be available to City’s staff, consultants and other staff at all reasonable times.

3.2.7 Standard of Care; Performance of Employees. Contractor shall construct the Project under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to construct the Project. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to construct the Project. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to construct the Project, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor’s failure to comply

Page 268 of 375 ends

CA-3
with the standard of care provided for herein. Any employee of the Contractor or its subcontractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to construct the Project in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be re-employed to perform any work on the Project.

3.2.7.1 Period of Performance and Liquidated Damages. Contractor shall perform and complete the Project under this Agreement within the term set forth in Section 3.1.2 above (“Term”). Contractor shall construct the Project in strict accordance with any timeframe provided herein, or which may be provided separately in writing to the Contractor. Contractor agrees that if the Project is not completed within the aforementioned Term and/or pursuant to any such completion schedule or Project milestones developed pursuant to provisions of this Agreement, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum of $1000.00 per working day:

3.2.8 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Project. If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.2.9 Insurance.

Throughout the life of this Contract, Contractor shall pay for and maintain in full force and effect all policies of insurance required hereunder with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated not less than "A- VII" in Best's Insurance Rating Guide, or (ii) as may be authorized in writing by City Manager or his/her designee at any time and in his/her sole discretion. The following policies of insurance are required:
(i) COMMERCIAL GENERAL LIABILITY insurance which shall be at least as broad as the most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01 and include insurance for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non-owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Contract) with limits of liability of not less than the following:
$5,000,000 per occurrence for bodily injury and property damage $1,000,000 per occurrence for personal and advertising injury $10,000,000 aggregate for products and completed operations $10,000,000 general aggregate

Page 269 of 375 ends

CA-4
(ii) COMMERCIAL AUTOMOBILE LIABILITY insurance which shall be at least as broad as the most current version of Insurance Service Office (ISO) Business Auto Coverage Form CA 00 01, and include coverage for all owned, hired, and non owned automobiles or other licensed vehicles (Code 1 Any Auto) with limits of liability of not less than $5,000,000 per accident for bodily injury and property damage.
(iii) WORKERS' COMPENSATION insurance as required under the California Labor Code.

(iv) EMPLOYERS’ LIABILITY insurance with limits of liability of not less than $1,000,000 each accident, $1,000,000 disease policy limit and $1,000,000 disease each employee.
(v) BUILDERS RISK (Course of Construction) insurance in an amount equal to the completed value of the project with no coinsurance penalty provisions. (Only required if the project includes new construction of a building; or renovation of, or addition to, an existing building.)
(vi) CONTRACTORS POLLUTION LIABILITY (Unless waived in writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is required for all environmental and water remediation work and for all work transporting fuel. Unless waived in writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is also required for demolition, renovation, HVAC, plumbing or electrical (including, without limitation, lighting) work on any structure built prior to the year 1990.) insurance with limits of liability of not less than the following:
$5,000,000 per occurrence or claim
$10,000,000 general aggregate per annual policy period
In the event Contractor purchases an Umbrella or Excess insurance policy(ies) to meet the minimum limits of insurance set forth above, this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies).

Should this Contract involve any lead based, mold or asbestos environmental hazard, either the Automobile Liability insurance policy or the Contractors Pollution Liability insurance policy shall be endorsed to include Transportation Pollution Liability insurance covering materials to be transported by Contractor pursuant to the Contract.

In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental hazards. In the event this Contract involves any asbestos environmental hazard (e.g., asbestos remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for asbestos environmental hazards. In the event this Contract involves any mold environmental hazard (e.g., mold remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for mold environmental hazards and “microbial matter including mold” within the definition of “Pollution” under the policy.

Contractor shall be responsible for payment of any deductibles contained in any insurance policies required hereunder and Contractor shall also be responsible for payment of any self-insured retentions. Any deductibles or self-insured retentions must be declared to, and approved by, the

Page 270 of 375 ends

CA-5
City Manager or his/her designee in his/her sole discretion. At the option of the City Manager or his/her designee, either (i) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees and agents; or (ii) Contractor shall provide a financial guarantee, satisfactory to the City Manager or his/her designee in his/her sole discretion, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall City be responsible for the payment of any deductibles or selfinsured retentions.

All policies of insurance required hereunder shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after 30 calendar day written notice has been given to City. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, Contractor shall furnish City with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for City, Contractor shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than 15 calendar days prior to the expiration date of the expiring policy.

The General Liability and Automobile Liability insurance policies shall be written on an occurrence form. The Contractors Pollution Liability insurance policy shall be written on either an occurrence form, or a claims-made form. The General Liability (including ongoing operations and completed operations), Automobile Liability and Contractors Pollution Liability insurance policies shall name City, its officers, officials, employees and agents as an additional insured. All such policies of insurance shall be endorsed so Contractor’s insurance shall be primary and no contribution shall be required of City, its officers, officials, employees and agents. The Builders Risk (Course of Construction) insurance policy shall be endorsed to name the City as a loss payee. Any Workers’ Compensation insurance policy shall contain a waiver of subrogation as to City, its officers, officials, employees and agents. The coverage(s) shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees and agents. If Contractor maintains higher limits of liability than the minimums shown above, City requires and shall be entitled to coverage for the higher limits of liability maintained by Contractor.

Claims-Made Policies - If any coverage required is written on a claims-made coverage form:
(i) The retroactive date must be shown, and must be before the effective date of the Contract or the commencement of work by Contractor.
(ii) Insurance must be maintained and evidence of insurance must be provided for at least 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iii) If coverage is canceled or non-renewed, and not replaced with another claimsmade policy form with a retroactive date prior to the effective date of the Contract, or work commencement date, Contractor must purchase extended reporting period coverage for a minimum of 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iv) A copy of the claims reporting requirements must be submitted to City for review. (v) These requirements shall survive expiration or termination of the Contract.

Page 271 of 375 ends

CA-6
Contractor shall furnish City with all certificate(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the City’s Risk Manager or his/her designee in his/her sole discretion prior to City’s execution of the Contract and before work commences. Upon request of City, Contractor shall immediately furnish City with a complete copy of any insurance policy required under this Contract, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Contract.

If at any time during the life of the Contract or any extension, Contractor or any of its subcontractors fail to maintain any required insurance in full force and effect, all work under this Contract shall be discontinued immediately, and all payments due or that become due to Contractor shall be withheld until notice is received by City that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to City. Any failure to maintain the required insurance shall be sufficient cause for City to terminate this Contract. No action taken by City hereunder shall in any way relieve Contractor of its responsibilities under this Contract.

The fact that insurance is obtained by Contractor shall not be deemed to release or diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this Contract. The duty to indemnify City shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Contractor, its principals, officers, agents, employees, persons under the supervision of Contractor, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them.

In the event of a partial or total destruction by the perils insured against of any or all of the work and/or materials herein provided for at any time prior to the final completion of the Contract and the final acceptance by the City of the work or materials to be performed or supplied thereunder, the Contractor shall promptly reconstruct, repair, replace, or restore all work or materials so destroyed or injured at his/her sole cost and expense. Nothing herein provided for shall in any way excuse the Contractor or his/her insurance company from the obligation of furnishing all the required materials and completing the work in full compliance with the terms of the Contract.

If Contractor should subcontract all or any portion of the services to be performed under this Contract, Contractor shall require each subcontractor to provide insurance protection in favor of City, its officers, officials, employees and agents in accordance with the terms of each of the preceding paragraphs, except that the subcontractors' certificates and endorsements shall be on file with Contractor and City prior to the commencement of any work by the subcontractor.

3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In constructing the Project, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks,

Page 272 of 375 ends

CA-7
confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.2.11 Bonds.

3.2.11.1 Performance Bond. Contractor shall execute and provide to City concurrently with this Agreement a Performance Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City.

3.2.11.2 Payment Bond. Contractor shall execute and
provide to City concurrently with this Agreement a Payment Bond in the amount of the total, notto-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by City.

3.2.11.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this section are accepted by the City. To the extent, if any, that the total compensation is increased in accordance with the Agreement, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. To the extent available, the bonds shall further provide that no change or alteration of the Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Agreement for cause.

3.2.11.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted.

The surety must be a California admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the City. If a California admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.3 Fees and Payments.

3.3.1 Compensation. Contractor shall receive compensation, including authorized reimbursements, for all construction services rendered under this Agreement at the rates set forth in Exhibit B attached hereto and incorporated herein by reference. Extra work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

Page 273 of 375 ends

CA-8

3.3.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement which indicates work completed by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

3.3.3 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement.

Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

3.3.5 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.4 Accounting Records.

3.4.1 Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services which have been adequately rendered to City, and

Page 274 of 375 ends

CA-9
Contractor shall be entitled to no further compensation. Contractor may not terminate this Agreement except for cause.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request.

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the follow address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor:

City:

CEM Construction Corporation
1412 Espanol Avenue
Montebello, CA 90640
Attention: Jesus Carrillo, President
City of Norco
2870 Clark Avenue
Norco, CA 92860
Attention: Director of Public Works
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the US Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.4 Attorney’s Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney’s fees and all other costs of such action.

3.5.5 Indemnification. To the furthest extent allowed by law including California Civil Code section 2782, Contractor shall indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage) incurred by City, Contractor or any other person, and from any and all claims, demands and actions in law or equity (including attorney's fees and litigation expenses), arising or alleged to have arisen directly or indirectly out of performance of this Contract. Contractor's obligations under the preceding sentence shall apply

Page 275 of 375 ends

CA-10
regardless of whether City or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of City or any of its officers, officials, employees, agents or volunteers.

If Contractor should subcontract all or any portion of the work to be performed under this Contract, Contractor shall require each subcontractor to indemnify, hold harmless and defend City and each of its officers, officials, employees, agents and volunteers in accordance with the terms of the preceding paragraph.

This section shall survive termination or expiration of this Contract.

3.5.6 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.7 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County.

3.5.8 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.9 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project.

3.5.10 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.11 Assignment or Transfer. Contractor shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.12 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be work days (Monday through Friday, excluding holidays). All references to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content or intent of this Agreement.

3.5.13 Amendment; Modification. No supplement, modification or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit,

Page 276 of 375 ends

CA-11
privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

3.5.15 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.5.16 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Contractor further agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services.

For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.18 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.20 Authority to Enter Agreement. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.21 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Contractor shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written

Page 277 of 375 ends

CA-12
approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

Name of Contractor: CEM Construction Corporation
*By:
_____________________________
Signature
Jesus Carrillo, President
OWNER: CITY OF NORCO, a municipal corporation
*By: ____________________________
Greg Newton, Mayor
ATTEST:
__________________________________
Dana Roa, CMC, City Clerk
APPROVED AS TO FORM:
___________________________________
John R. Harper, City Attorney
NOTE: SIGNATURES OF CORPORATE OFFICIALS MUST BE NOTARIZED.

Attach Certificate of Notary Acknowledgment

Page 278 of 375 ends

CA-13

EXHIBIT A
Scope of MDP Line N-1C Extension Storm Drain Project
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of the general items of work to be done hereunder consist of roadway widening, curb ramps, curb and gutter, catch basins, storm drain pipe, storm drain manholes, striping and other improvements on the Norco MDP Lateral N-1C Extension Storm Drain Project to the satisfaction and acceptance of the City Engineer.

The services shall be performed in accordance with the Standard Specifications for Public Works Construction (Green Book), latest edition, including all current supplements, addenda, and revisions thereof (hereinafter referred to as “Standard Specifications”) incorporated herein by this reference. Any provisions which supplement or modify the Standard Specifications are attached hereto as Special Provisions and incorporated herein by this reference.

Page 279 of 375 ends

CA-14

EXHIBIT B
Proposal Document

Page 280 of 375 ends

CA-15

CONTRACT PERFORMANCE BOND
(CALIFORNIA PUBLIC WORK)
KNOW ALL MEN BY THESE PRESENT:

THAT WHEREAS, the City of Norco (sometimes referred to hereinafter as “Obligee”) has awarded to ___________________________________________________________ ___________________________________________________________ (hereinafter designated as the “Contractor”), an agreement for the work described as follows:

MDP LINE N-1C EXTENSION STORM DRAIN PROJECT
The general items of work to be done hereunder consist of:

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist approximately 1,000 linear feet of varying size RCP storm drain pipe along with lateral pipes, manholes, and catch basins. The storm drain will be located within Pedley Avenue and will be connected to the MDP Lateral N-1C storm drain. The project also includes street improvements on Pedley including curb and gutter, driveways, and asphalt work to the satisfaction and acceptance of the City Engineer. (hereinafter referred to as the “Public Work”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in that certain contract for the said Public Work dated ___________________, (hereinafter referred to as the “Contract”), which Contract is incorporated herein by this reference; and WHEREAS, the Contractor is required by said Contract to perform the terms thereof and to provide a bond both for the performance and guaranty thereof.

NOW, THEREFORE, we, ____________________________________________, the undersigned Contractor, as Principal, and ____________________________________ ________________________________, a corporation organized and existing under the laws of the State of____________, and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Norco in the sum of ______________________________________________________ Dollars ($ _________________), said sum being not less than 100 percent of the total amount payable by the said Obligee under the terms to the said Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if the bounden Contractor, his

Page 281 of 375 ends

CA-16
or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the said Contract and any alteration thereof made as therein provided, on his or its parts, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill the one year guarantee of all materials and workmanship; and indemnify and save harmless the Obligee, its officers and agents, as stipulated in said Contract, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration of addition to the terms of the Contract, or to the work or to the Specifications.

No final settlement between the Obligee and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

Contractor and Surety agree that if the Obligee is required to engage the services of an attorney in connection with enforcement of the bond, each shall pay Obligee’s reasonable attorney’s fees incurred, with or without suit, in addition to the above sum.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this ____ day of _________, 2022.

PRINCIPAL/CONTRACTOR:
_________________________________
By: ______________________________
SURETY:
_________________________________
By: ______________________________
Attorney-in-Fact

Page 282 of 375 ends

CA-17
The rate of premium on this bond is _________________________ per thousand.

The total amount of premium charged: $_____________________________________ (The above must be filled in by corporate surety).

IMPORTANT: Surety companies executing bonds must possess a certificate of authority from the California Insurance Commissioner authorizing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the work or project is financed, in whole or in part, with Federal, grant, or loan funds, it must also appear on the Treasury Department’s most current list (Circular 570 as amended). THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:
(Name and Address of Surety) ________________________________ ________________________________
________________________________
(Name and Address of Agent or ________________________________ Representative for service of
process in California if ________________________________ different from above)
________________________________
(Telephone Number of Surety and ________________________________ Agent or Representative for
service of process in California) ________________________________ ________________________________

STATE OF CALIFORNIA )
) ss.

COUNTY OF )

Page 283 of 375 ends

CA-18
On this ____ day of ___________, in the year _________, before me, ______________________, a Notary Public in and for said State, personally appeared ____________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-in-Fact of the _________________________ (Surety) and acknowledged to me that he subscribed the name of the ______________________________ (Surety) thereto and his own name as Attorney-in-Fact.

Notary Public in and for said State
(SEAL)
Commission expires:______________________________
NOTE:

A copy of the Power of Attorney to local representatives of the bonding company must be attached hereto.

Page 284 of 375 ends

CA-19

PAYMENT BOND
(CALIFORNIA PUBLIC WORK)
KNOW ALL MEN BY THESE PRESENT:

THAT WHEREAS, the City of Norco (sometimes referred to hereinafter as Obligee” has awarded to ____________________________________________________________ __________________________________(hereinafter designated as the “Contractor”), an agreement dated________________________________, described as follows:

MDP LINE N-1C EXTENSION STORM DRAIN PROJECT
The general items of work to be done hereunder consist of:

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist approximately 1,000 linear feet of varying size RCP storm drain pipe along with lateral pipes, manholes, and catch basins. The storm drain will be located within Pedley Avenue and will be connected to the MDP Lateral N-1C storm drain. The project also includes street improvements on Pedley including curb and gutter, driveways, and asphalt work to the satisfaction and acceptance of the City Engineer. (hereinafter referred to as the “Contract”) and
WHEREAS, said Contractor is required to furnish a bond in connection with said Contract and pursuant to Section 3247 of the California Civil Code; NOW, THEREFORE, We, _______________________________________________, the undersigned Contractor, as Principal; and __________________________________ ______________________________________________________________________ a corporation organized and existing under the laws of the State of __________________, and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Norco and to any and all persons, companies, or corporations entitled to file stop notices under Section 3181 of the California Civil Code, in the sum of
________________________________________________________________Dollars ($ _________________), said sum being not less than 100 percent of the total amount payable by the said Obligee under the terms of the said Contract, for which payment will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if said Contractor, his or its

Page 285 of 375 ends

CA-20
heirs, executors, administrators, successors, or assigns, or Subcontractors, shall fail to pay for any materials, provisions or other supplies, implements, machinery, or power used in, upon, for, or about the performance of the Public Work contracted to be done, or to pay any person for any work or labor of any kind, or for bestowing skills or other necessary services thereon, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of paid Contractor and his Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor as required by the provisions of Section 3247 through 3252 of the Civil Code, the Surety or Sureties hereon will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In addition to the provisions herein above, it is agreed that this bond will insure to the benefit of any and all persons, companies, and corporations entitled to serve stop notices under Section 3181 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or additions to the terms of the said Contract or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract or to the work or to the Specifications.

No final settlement between the Obligee and the Contractor hereunder shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

Contractor and Surety agree that if the Obligee is required to engage the services of an attorney in connection with the enforcement of this bond, each shall pay Obligee’s reasonable attorney’s fees incurred, with or without suit, in addition to the above sum.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _____day of_______________, 2022.

PRINCIPAL/CONTRACTOR:

_____________________________________

By: __________________________________
SURETY:

_____________________________________

Page 286 of 375 ends

CA-21
By: __________________________________
Attorney-in-Fact
The rate of premium on this bond is ________________________ per thousand.

The total amount of premium charged: $ _____________________________________ (The above must be filled in by corporate Surety).

IMPORTANT: Surety companies executing bonds must possess a certificate of authority from the California Insurance Commissioner authorizing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the work or project is financed, in whole or in part, with Federal, grant, or loan funds, it must also appear on the Treasury Department’s most current list (Circular 570 as amended). THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:
(Name and Address of Surety) _______________________________ _______________________________

_______________________________
(Name and Address of Agent or _______________________________ Representative for service of
process in California if _______________________________ different from above)
_______________________________
(Telephone Number of Surety and _______________________________ Agent or Representative for
service of process in California _______________________________

_______________________________

STATE OF CALIFORNIA )
) ss.

Page 287 of 375 ends

CA-22

COUNTY OF )
On this ________ day of _________________, in the year _________, before me, ________________________, a Notary Public in and for said State, personally appeared _____________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-in-Fact of the _____ ___________________ (Surety) and acknowledged to me that he subscribed the name of the _________________________________ (Surety) thereto and his own name as Attorney-in-Fact.

_____________________________________
Notary Public in and for said State
(SEAL)
Commission expires:________________________
NOTE:

A copy of the Power of Attorney to local representatives of the bonding company must be attached hereto.

Page 288 of 375 ends

CA-23

GENERAL LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ Policy Number _____________________

2. Policy Term (From) _______________ (To)________________ Endorsement Effective Date ______________________________________

3. Named Insured _______________________________________________

4. Address of Named Insured
_____________________________________________________________ _____________________________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________________ /_____________________________

6. Deductible or Self-Insured Retention (Nil unless otherwise specified):
______________________________________________

7. Coverage is equivalent to:

Comprehensive General Liability Form GL0002 (Ed. 1/73)
______________________________________________
Commercial General Liability “Occurrence” Form CG0001
______________________________________________

8. Bodily Injury and Property Damage Coverage is:
____________________________________”occurrence”
Note: The City of Norco standard insurance requirements specify “occurrence” coverage. “Claims-made” coverage is not acceptable. If commercial general liability form or equivalent is used, the general aggregate must apply separately to this location/project or the general aggregate must be twice the occurrence limit.

Page 289 of 375 ends

CA-24

9. Description of Project:

MDP LINE N-1C EXTENSION STORM DRAIN PROJECT
The general items of work to be done hereunder consist of:

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist approximately 1,000 linear feet of varying size RCP storm drain pipe along with lateral pipes, manholes, and catch basins. The storm drain will be located within Pedley Avenue and will be connected to the MDP Lateral N-1C storm drain. The project also includes street improvements on Pedley including curb and gutter, driveways, and asphalt work to the satisfaction and acceptance of the City Engineer.

B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. As respects any work performed on the above described Project, the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, and volunteers are included as insured with regard to damages and defense of claims arising from: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, or (c) premises owned, leased, or used by the Named Insured.

2. CONTRIBUTION NOT REQUIRED. As respects: (a) work performed by the Named Insured on the above described Project for or on behalf of the City of Norco; or (b) products sold by the Named Insured to the City of Norco for use on the Project; or (c) premises leased by the Named Insured from the City of Norco, the insurance afforded by this policy shall be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers; or stand in an unbroken chain of coverage excess of the Named Insured’s schedule underlying primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage at least as broad as:
(1) Insurance Services Office Form Number GL 0002 (Ed. 1/73), Comprehensive General Liability Insurance and Insurance Services

Page 290 of 375 ends

CA-25
Office form number GL 0404 Broad Form Comprehensive General Liability endorsement; or
(2) Insurance Services Office Commercial General Liability Coverage, “Occurrence” Form CG 0001; or
(3) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Sections (1) and (2).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respects to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
______________________________
(Telephone Number)

Page 291 of 375 ends

CA-26
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to (Print/Type Name)
bind the below-listed insurance company and by my signature hereon do so bind this company.
____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________________________

Page 292 of 375 ends

CA-27

AUTOMOBILE LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement #_____________________

1. Insurance Company _____________________________________________ Policy Number _____________________

2. Policy Term (From)________________(To) _______________ Endorsement Effective Date ___________

3. Named Insured________________________________________________

4. Address of Named Insured________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________ /_____________________________________

6. Deductible or Self-Insured Retention
(Nil unless otherwise specified):
$____________________________________________________________ B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. The City of Norco, its elected or appointed officers, officials, consulting engineers, employees and volunteers are included as insured with regard to damages and defense of claims arising from: the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers.

2. CONTRIBUTION NOT REQUIRED. As respects work performed by the Named Insured for or on behalf of the City of Norco, the insurance afforded by this

Page 293 of 375 ends

CA-28
policy shall: (a) be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers; or (b) stand in an unbroken chain of coverage excess of the Named Insured’s primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage to the Named Insured at least as broad as:
(1) Insurance Services Office form number CA 00001 (Ed. 1/78), Code 1 (“any auto”) and endorsement CA 0025.
(2) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Section (1).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage, or against whom a claim is made or a suit is brought, except with respect to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

Page 294 of 375 ends

CA-29
C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
____________________________________________________
(Telephone Number)
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to (Print/Type Name)
bind the below-listed insurance company and by my signature hereon do so bind this company.
____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________

Page 295 of 375 ends

CA-30
WORKER’S COMPENSATION/EMPLOYER’S LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ (“the Company”)
Policy Number _________________________________________________

2. Effective Date of this Endorsement ________________________________

3. Named Insured_________________________________________________

4. Employer’s Liability Limit (Coverage B)______________________________ _____________________________________________________________ B. POLICY AMENDMENTS
In consideration of the policy premium and notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:
(1) Cancellation Notice. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.
(2) Waiver of Subrogation. The Insurance Company agrees to waive all rights of subrogation against the City of Norco, its elected or appointed officers, officials, agents and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the City of Norco.

Page 296 of 375 ends

CA-31
C. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, _______________________, warrant that I have authority to bind (Print/Type Name)
the below-listed insurance company and by my signature hereon do so bind this company.

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original signature required on endorsement furnished to the City of Norco) ORGANIZATION: ____________________________________________________ TITLE: ____________________________________________________ ADDRESS: ____________________________________________________ TELEPHONE: ____________________________________________________

Page 297 of 375 ends

CA-32

Page 298 of 375 ends

CA-33

Page 299 of 375 ends

CA-34

Page 300 of 375 ends

CA-35

Page 301 of 375 ends

City Council

STAFF REPORT
Date: July 6, 2022 Agenda Item:

5.A.

To: Honorable Mayor and City Council Members
Prepared By: Michelle Anglin, Community Services Director Department: Community Services
SUBJECT:

Approval of the Memorandum of Understanding Between the City of Norco and City of Corona for Collaborative Homeless Programs and Services.

RECOMMENDATION:

1. Approve the Fiscal Year 2023 Memorandum of Understanding (MOU) between the City of Norco and City of Corona for collaborative homeless programs and services, and authorize the City Manager to execute the Fiscal Year 2023 MOU.

2. Authorize the City Manager, or his designee, to approve non-substantive amendments, including line-item adjustments and hourly compensation rate increases within the approved program budget of Fiscal Year 2023 MOU between the City of Corona and the City of Norco.

SUMMARY:

The City Council will consider approving the Fiscal Year 2023 Memorandum of Understanding (MOU) between the City of Corona and the City of Norco for Collaborative Homeless Programs and Services which are provided through City Net. The Fiscal Year 2022 MOU expired on June 30, 2022 and the City of Corona City Council voted unanimously on June 15, 2022 to extend the agreement through June 30, 2023. Staff is recommending the Norco City Council approve the Fiscal Year 2023 Corona-Norco MOU for Collaborative Homeless Programs and Services for a total amount not to exceed $615,690.

BACKGROUND:

On July 7, 2021, Norco City Council approved the Fiscal Year 2022 MOU for Collaborative Homeless Services with the City of Corona (Exhibit A). This program's service level consisted of thirty-two (32) hours of weekly street outreach, engagement and case management along with eight (8) motel emergency shelter rooms per night. In addition, the MOU included a 10% administrative fee that was paid to the City of Corona for managing Norco’s homeless programs through the City Net contract.

Page 302 of 375 ends

The Corona-Norco Collaborative Homeless Services partnership has been extremely successful. During this past fiscal year, Norco’s motel shelter program has been at capacity serving homeless clients with documentable ties to the City of Norco. In addition, City Net continues to actively engage Norco’s homeless neighbors in River Trails Park within the Santa Ana River and on the streets throughout the City of Norco.

The County views the Corona-Norco Partnership as a successful best practice.

Accordingly, Supervisor Karen Spiegel attended the Corona City Council meeting on June 15, 2022 to thank the City of Corona for partnering with the City of Norco to collaboratively address homeless issues in her District. In addition, during the June 16, 2022 2nd District Santa Ana Riverbed Homeless Collaborative meeting, Supervisor Spiegel complimented the cities of Corona and Norco for their work on this successful partnership.

The proposed Fiscal Year 2023 MOU for Collaborative Homeless Services with the City of Corona includes the continuation of the motel program to provide eight (8) emergency shelter motel rooms per night, two (2) City Net part-time case managers that provide outreach, engagement, and case management services two (2) days per week, contract management through the City of Corona Homeless Solutions Manager and a partnership with Corona for the Make It Cozy (MIC) Program since community stakeholders from both cities donate resources to support MIC.

Because the City of Corona manages the regional Santa Ana River (SAR) Collaborative for the Corona-Norco region, the two cities were the first in the western region to place 100 percent of SAR encampment residents into motel shelter and to obtain approval from the Army Corps of Engineers for clean-up of fire hazards and debris from the homeless encampments in the area.

At the July 6, 2022 Council meeting, Karen Roper, the City of Corona Homeless Solutions Manager will be conducting a presentation to provide City Council and the public with a report on outcomes and progress during Fiscal Year 2022.

Staff is requesting that City Council authorize the City Manager to renew and execute the Fiscal Year 2023 MOU with the City of Corona up to the maximum amount of $615,690 and to approve non-substantive amendments, including line-item adjustments and hourly compensation rate increases within the approved program budget of Fiscal Year 2023 MOU between the City of Corona and the City of Norco. The Fiscal Year 2022 MOU with Corona is attached to this agenda item for reference as the terms and conditions of the Fiscal Year 2023 MOU will be substantially similar, other than the dates, budgeted amounts and format of tables and budget exhibits.

If the City Council approves staff recommendations, the Fiscal Year 2023 MOU will be finalized and executed with the term beginning on July 1, 2022 through June 30, 2023.

FISCAL IMPACT:

The total estimated cost under this MOU between the City of Corona and the City of Norco for Collaborative Homeless Programs and Services for Fiscal Year 2023 is a not-toexceed amount of $615,690. Funding for this program is included in the Fiscal Year 2023 approved operating budget which includes $250,000 appropriation from the Successor Housing Entity’s Affordable Housing Fund Account 018.5010.41256 and $365,690

Page 303 of 375 ends

appropriation from the City’s allocation of American Rescue Plan Act Funds Account 155.724.41256. Additional funds are also included in the budget to deal with encampment issues that are outside of the scope of services covered by this MOU.

RELATIONSHIP TO STRATEGIC PLAN:

The Memorandum of Understanding Between the City of Norco and City of Corona for Collaborative Homeless Programs and Services is consistent with Strategic Plan Direction No. 1 - Public Health, Safety and Wellness: Enhance quality of life by promoting public health, safety and wellness initiatives for all community members. Action Plan No. 1 - Expand collaborative efforts to provide services, shelter and housing for homeless neighbors.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Exhibit A

Page 304 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 305 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 306 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 307 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 308 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 309 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 310 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 311 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 312 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 313 of 375 ends

DocuSign Envelope ID: C88A282E-74CD-460E-BDF5-BB9993928979 DocuSign Envelope ID: 5AFD4456-3698-46E9-A763-A28540911F73

Page 314 of 375 ends

City Council

STAFF REPORT
Date: July 6, 2022 Agenda Item:

5.B.

To: Honorable Mayor and City Council Members
Prepared By: Matt Boudreaux, IT Manager
Department: IT
SUBJECT:

Comprehensive IT Assessment and IT Master Plan Report
RECOMMENDATION:

Receive and File
SUMMARY:

The City of Norco and ClientFirst Technology Consulting has completed the Comprehensive Information Technology (IT) Assessment and five-year IT Master Plan Report. The resulting IT Master Plan includes recommendations for improvements with estimated funding requirements that the City can consider for implementation in future years.

BACKGROUND:

In March 2021, the City Council approved a Professional Services Agreement between the City of Norco and ClientFirst Technology Consulting in the amount of $57,807 for a Comprehensive IT Assessment and IT Master Plan.

The purpose of the plan is to guide IT's function and the City's operational departments over the next several years by planning, procuring, implementing, and managing current and future technology investments, as well as resources related to operational technology and information technology service delivery. The plan also serves as a "living" document that becomes the basis for regular review and adjustment of the five-year future with respect to infrastructure, equipment, software, staffing, and the effective use of technology to support the work of the City. Budgetary estimates for each initiative are outlined in the report with prospective funding sources.

Development of the plan consisted of collaborative workshops with City departments to assess technological needs; site visits at all City facilities to evaluate current IT infrastructure status; and identification of the resources required to accommodate current and future technology requirements.

Page 315 of 375 ends

City staff recommends the members of the City Council receive and file the Comprehensive IT Assessment and IT Master Plan.

FISCAL IMPACT:

There is no fiscal impact at this time. As outlined in the report, future year expenditures would come back to City Council for approval as needed.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction #1 - Infrastructure and Asset Management:

Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney
ATTACHMENT(S):

Technology Master Plan - Executive Summary

Page 316 of 375 ends

Technology Master Plan
June 2022
Client Locations
Coast-to-Coast
Practice Locations
California
Illinois
North Carolina
Texas
800.806.3080
www.clientfirstcg.com

Page 317 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
2 | 28
Table of Contents
ENGAGEMENT PURPOSE AND BACKGROUND..................................3 Technology Master Plan Objective ......................................................................... 3 Deliverables............................................................................................................ 3 Methodology and Approach.................................................................................... 4 TECHNOLOGY ASSESSMENT SUMMARY..........................................5 Overview................................................................................................................. 5 Current Technology Environment ........................................................................... 6 Key Statistics and Metrics....................................................................................... 7 TECHNOLOGY STRATEGIES, GOALS, AND OBJECTIVES .................10 TECHNOLOGY DECISION-MAKING PRINCIPLES..............................13 Vision / Mission Statement ................................................................................... 13 IT INITIATIVE SUMMARIES............................................................14 Introduction........................................................................................................... 14 IT Initiative Categories.......................................................................................... 14 KEY ISSUES AND INITIATIVES .......................................................17 SUMMARY PLAN BUDGET ANALYSIS............................................23 CONCLUSION..............................................................................25 Moving Forward.................................................................................................... 25 Benefits................................................................................................................. 26 Immediate Next Steps .......................................................................................... 26 TECHNOLOGY MASTER PLAN CAPITAL BUDGET ...........................27 TECHNOLOGY CURRENT STATE ASSESSMENT (INITIATIVES)..........28

Page 318 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
3 | 28
Engagement Purpose and
Background
The objective of the Technology Master Plan is to develop and articulate a vision for the effective use of technology to support the work of the City, assuring the proper technical resources and organizational structure to effectively manage information technology and the applications utilized by the departments. This plan identifies strategies for developing and implementing technology initiatives and
needs. The recommendations in this plan focus on improvements to IT infrastructure and business applications to make technology more effective in supporting the departments and goals of the organization.

A well-documented plan will
the next several years by planning, procuring, implementing, and managing current and future technology investments, as well as resources related to operational technology and information technology service delivery. The plan is the result of a thorough analysis of the following:

Interviews and workshops involving all levels of
management team, end-users, and other stakeholders, while recognizing limited staff availability
Existing hardware and network infrastructure, staffing, funding, applications, business systems, projects, processes, telecommunications, training, and other investments and resources currently in use by the City
Identification and prioritization of initiatives and projects to undertake over the next five years
Identification of the resources required to accommodate current and future technology requirements, such as IT operations and management, legal requirements, cybersecurity requirements, service delivery, cloud computing, staffing, et cetera.

The assessment includes:

Project Purpose and Background
Methodology for Implementation and
Maintenance of the Assessment
Current Technology Environment
Summary
Key Benchmarking Metrics
Strategies, Goals, and Objectives
IT Initiatives (Projects) by Priority
Key Issues
Timelines
IT Plan Budgets
Technology Master Plan Objective
•
•
•
•
Deliverables
•
•
•
•
projects in support of the organization's operational
the City's
guide the IT function and the City's operational departments over the City's operational staff, including the
•
•
•
•
•

Page 319 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
4 | 28
The project adopted a five-phase methodology for Technology Master Planning. The phased approach served as the cornerstone of the project, allowing a collaborative process to shape and develop the recommendations.

Methodology and Approach

PROJECT INITIATION AND

TECHNOLOGY INVENTORY

ASSESSMENT

RESEARCHANDPROJECTI

INITIATIVE DEVELOPMENT

PLANNING AND

PRIORITIZATION WORKSHOPS

FINAL REPORT AND

PRESENTATIONS
Stakeholder Team Development
Kick-Off
Change Managemenl
Technology Inventory
Non-IT Department Assessment Workshops
IT Infrastructure. Operations. and Staffing Review
Assess Strengths and Weaknesses
Define Strategies. Goals, and Objectives
Develop Preliminary Initiatives / Projects
Staffing Recommendations
Research Alternative Solutions
Preliminary Budgets and Prioritizations
Project Sponsor and IS
Project Committee
Executive Management
Cost-Benefrt ROI Considerations
Develop Final Report
Leadership and Etected Officials
Prese ntati onsNvorksh ops

Page 320 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
5 | 28
Technology Assessment Summary
The major business applications are capable of meeting the departments operational requirements with two exceptions. Tyler New World, t system (financials, human resources, payroll, community development, and utility billing) vendor, has announced that the product will be Munis. The City will need to determine whether moving to Tyler Munis or exploring the marketplace for a new ERP system is the correct strategy.

Staff have also identified many gaps in the capabilities of the document management system. An assessment and gap analysis of the system is recommended before selecting a new citywide document management system. Modern document management systems can also provide greater functionality including integrations with many other software systems and workflow automation tools that could streamline many of the manual processes maintained throughout City operations.

Staff realize that updates and improvements to business applications and business processes are necessary to meet the needs of constituents. An increased desire to leverage business applications that serve constituents has resulted in a desire to increase investment in technology, leading to the creation of this plan. We recommend that, over time, detailed assessments and process reviews be undertaken to improve efficiency and resident services in the majority of business applications.

COVID-19 has also increased the demand for flexible communications, technology, and mobile computing. The demand for more flexible working capabilities continues to be strong even as the virus has waned. The existing email and file sharing methodology must be updated to provide tools supporting mobility and collaboration. Moving to Microsoft 365 will provide staff with additional tools that are expected to improve communication and overall productivity.

Over the past three years, cybersecurity threats have increased significantly, requiring government agencies to increase spending on cybersecurity, risk mitigation, and resiliency.

Increased spending to improve core infrastructure, the resiliency of the technology infrastructure and additional cybersecurity tools have been included in the initial years of the plan.

Throughout the City, the demand for IT services has exceeded available resources. Additional investment in improving and managing business applications are now necessary to support increased communications, applications, data sharing, and reporting needs. With the many needs, technology governance will be important to the successful implementation of the plan.

Successful implementation will also require additional resources dedicated to cybersecurity and business application analyst(s) assisting departments to improve application utilization and efficiency.

Due to limitations, staff training and underutilization of some software systems, department staff have created numerous manual workarounds that increase reliance on external shadow systems to bridge application business process shortcomings. The goal of the plan is to affect a Digital Transformation at the City, reducing the reliance on paper and shadow systems while increasing automation and efficiency.

Overview
City's
he City's ERP
"sunsetted" and replaced by
City's
City's

Page 321 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
6 | 28
The majority of IT infrastructure is aging and will require a refresh within the next two years.

The City Hall structured cabling system was not installed according to best practices and should be replaced to reduce maintenance costs and increase bandwidth. Additional investment in cybersecurity mitigation efforts, disaster recover planning, and system resiliency are outlined in the below plan. We recommend that the City expand capital replacement planning to include all technical equipment and a long-term sustainability plan to institutionalize ongoing investment in technology.

The table below summarizes the current technology environment at the City:

Item Quantities
Number of Agency Facility Addresses 17
IT FTE (including contracted IT Staff) 2
Number of Employees (FT/PT) 64/52
Telephones 110
Smart phones 65
Tablets 35
Desktops/Workstations 75
Laptops 31
Printers 24
Physical Servers 20
Virtual Servers 30
Network Devices
(e.g., routers, switches, access pointes, etc.) 41
Additionally, the City currently utilizes over 120 application systems and software modules.

Major enterprise application systems include:

Application Functionality Vendor-Application Name
Financial Management Tyler New World
Human Resources Tyler New World
EAM (Enterprise Asset Mgmt./Work Orders &
Maintenance Management) CentralSquare - Lucity
Land Management/Community Development Tyler New World
Parks and Recreation ActiveNet
Electronic Document and Records Management DocuShare
Geographic Information System (GIS) ESRI ArcGIS
Current Technology Environment

Page 322 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
7 | 28
The following analysis provides feedback on key measurements regarding technology investments and IT support operations:

Technology Budgeting/Expenditures Technology Spending vs. Operating Related Budgets IT Staffing IT Staffing Ratios
IT Capital Replacement Schedules Equipment Replacement Schedules Technology Spending versus Operating Related Budgets
Technology Spending versus Operating Budgets provides an overall indication of whether the technology systems and IT support function receive a sufficient level of organizational resources to provide the necessary services. Over time, underfunding typically reduces the IT spond to requests, reduces system availability, and negatively impacts organization-wide productivity.

The following table depicts Norco Technology Spending versus Recommended Best Practices and a local government benchmark of 27 agencies.

Norco
FY21 (Actual)
Norco
FY22 (Budgeted)
Norco
FY23 (Budgeted)
Recommended
Low Benchmark Recommended High

3.26% 2.76% 3.97% 3.00% 3.98% 6.0%
operating expenditures for FY20 (actual), FY21 (budgeted), and FY22 (budgeted) totaled $26,849,250, $27,768,886, and $30,843,265, respectively. Technology expenditures approximated $875,294 $766,026, and $1,223,232, respectively. The municipal spending benchmark in the survey ranges between 1% and 8%. Survey results have an average technology expenditure of 3.98%. The historical percentage of technology expenditures versus operating-related budgets at Norco have been below municipal industry standards. This can be indicative of an agency that is under-investing in technology and has lower IT staffing levels than peer agencies.

Key Statistics and Metrics
Department's ability to re
$1 ,400,000
$1,200,000
$1 ,000 ,000 r
$800,000
$600,000
$400,000
$200,000
The City's total
FY21
's
Expenditure Analysis
FY22 Low Peer
Berichmark
HilJh

Page 323 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
8 | 28
Based on a heightened level of cyber threats and increasing cyber security insurance requirements, we are recommending a significant increase in the C investment in cyber security. In addition, the need for several large technology projects including a new ERP solution over the next few years will result in expenditures above the normal recommended high. We expect these infrastructure improvements and application system enhancements to result in increased productivity throughout the City, as well as greater citizen transactions, IT Staffing Ratios
versus a municipality benchmark of 67 similar agencies. These are commonly used measures in the industry to validate staffing levels. As the number of individuals served and the amount of equipment increases, staffing levels should also increase.

Norco Municipality
Benchmark
Recommended
Best Practice
Employees per IT Staff 75 72 75
Servers per IT Staff 25 10 10
Computers/Laptops per IT Staff 53 65 60
compared to peer agencies. We were impressed by the productivity of the IT staff and feel the recent addition of a paid intern position provides the city with sufficient technical staff.

However, these benchmarks do not properly reflect City needs related to departmental business applications or GIS. Department demand related to Digital Innovation, improved application integration, improved constituent service levels, and improved internal information flow is high.

This report recommends implementation of a new ERP system and improvements to existing application systems. Staffing recommendations include expanding business systems analysis skills in the IT team in support of expanded need for business applications support (see the Applications Management Best Practices initiative).
ity's ongoing
service access, and interactions through the City's website.

The following table depicts Norco's IT Staffing Ratios per employee and computer equipment 90 Em lo e-es Per IT Staff
75 30
0 120 Computers Per IT Staff
Norco
,oo +-------
3-0
a
ocal Goll.

Bendlm
Reoomm!nood
Be;;tPramce
tocslGO'u
BendJma1k
Re;::crnmeM:d
B.stf'raroce
30 Servers Per IT Staff
25 _____ mo
■ Reccmme nded
Best Practice
In this comparison, the City's IT staff supports more servers than recommended when

Page 324 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
9 | 28
Equipment Replacement
Capital Equipment Replacement is an important measure of the ability of hardware to adequately support the ongoing vendor changes to application software. These changes often require additional resources and hardware that are more robust. Slow capital replacement cycles can result in overall increased downtime and slower system response times.

The following table represents IT equipment replacement recommended best practices and a municipal benchmark of 51 agencies.

Norco Municipal
Benchmark
Recommended
Best Practices
Laptops 5 4 4
PCs 5 4 5
Servers N/A 5 5
Most IT infrastructure components are aging and are scheduled for replacement in the next two years. The City should use these replacements to redesign the data network and procure the next generation of server and disk (hyperconverged infrastructure). During the planned data network upgrade, the City will have an opportunity to dramatically improve site to site communication speeds, consolidate network equipment and implement additional resiliency for improved operations over the next seven to ten years.
8 6 5
f
•4
~
2 0
8 PCs
Nomo
6 5 5 ;4 Local! Gov. ,l! Benchmark
2 ■ Recommended
Best Practices
0 Laptops
No co
Loca Gov.

Ben chm ar"k
■ Recomme ded
Best Practices
8 Servers
6 f!
•4
,-
2 0
Norco
Local Gov.

Benchmark
■ Recommended
Best Practices

Page 325 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
10 | 28
Technology Strategies, Goals, and
Objectives
Strategies for leveraging and maximizing information system utilization in delivering City services are listed below. Within each strategy, initial goals and objectives are identified. The goals and objectives have been translated into specific initiatives later in the Technology Current State Assessment section of the report. Outlined in the report are the budgetary costs for each initiative, prioritization, and implementation time frame.

Ensure Technology Governance
Goals and Objectives
Create a Technology Steering Committee and governance mechanism.

Focus Committee meetings on prioritizing technology projects and training needs.

Monitor the Plan and recommend adjustments on an annual basis.

Utilize the Committee to improve collaboration on projects and initiatives.

Focus on applications integration across departments.

Identify key business process issues and improve.

Establish training goals and develop analytical skills throughout the organization.

Improve Application Utilization
Goals and Objectives
Develop improvement plans for departmental and enterprise applications.

Identify and implement improvements that benefit City constituencies.

Continue to work with departments to increase efficiency by leveraging application software functionality to streamline and automate processes.

Plan for and fund adequate user training and support for business application systems.

Maintain a culture of departmental enterprise application ownership for core applications.

Continue to adapt and improve processes and data availability while integrating business application software.

Increase the availability of IT resources capable of assisting departments and improve business processes and application utilization.

Follow Enterprise Reporting Best Practices.
•
•
•
•
•
•
♦
♦
♦
♦
♦
♦
♦
■
■

Page 326 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
11 | 28
Replace the ERP System
Goals and Objectives
T , and
utility billing) vendor, has announced that the product will be customers will be encouraged to move to their other product.

Conduct an assessment and business process reviews to determine the overall functionality and workflow automation needs of the City in order to close gaps that have been experienced with the current system.

Obtain a quote from product, as well as full implementation services.

Determine if it is advisable to move to the migrate with the existing vendor or if evaluating other vendors would be in the best interest of the city. If not, conduct a procurement following Software Selection Best Practices
Implement using best practices with Project Management Office, utilizing PMI (Project Management Institute) standards.

Improve IT Infrastructure
Goals and Objectives
Replace City Hall structured cabling and redesign the data center.

Evaluate and improve the fiber network installation to reduce unplanned outages.

Redesign the data network, converging physically separate wireless and data services to reduce costs and ease support.

Continue moving applications to the cloud when economically feasible.

Strengthen Infrastructure Resilience and Disaster Recovery Capabilities Goals and Objectives
Continue to implement redundant high-speed Internet connections.

Expand current information technology security efforts to include additional monitoring and advanced threat-protection tools.

Implement Microsoft 365 and an electronic mail archiving/backup solution.

Develop a Cybersecurity Emergency Response Plan.

Develop and test a Disaster Recovery Plan.

Identify high-priority systems and recovery time frames.

Exercise and test Disaster Recovery Plans regularly.
• he City's ERP system (financials, human resources, payroll, community development •
•
•
•
•
•
•
•
•
•
•
•
• ♦
♦
"sunsetted" and
the existing vendor's other
the City's

Page 327 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
12 | 28
Adopt Digital Transformation as a Strategy
Goals and Objectives
Enhance or procure business application systems to automate and streamline departmental operations.

Inventory manual application system interfaces and automate.

Improve business application access and training for all users.

Leverage business systems to improve cumbersome business processes.

Inventory unmet reporting needs by department and application system.

Include currently maintained/created manual and shadow system (e.g., Excel) data tracking and reporting.

Develop plans to automate reporting.

Create dashboards to assist in ongoing management and decision-making.

Obtain vendor report writer training for applicable systems and City staff.

Expand Business Analysis Capabilities
Goals and Objectives
Consider increasing IT staff to include a Business Systems Analyst position to assist departments with business process improvements.

Assist with application assessments and implementations.

Work with departments to improve business processes.

Develop dashboards, reports, and information sources for staff and constituents.

Depending on the amount of available funding, utilize third parties to assist departments with business process related improvements.

Improve City Telephone Systems
Goals and Objectives
. Replace the obsolete telephone system (installed in 2012) with a current generation product.

Utilize call center technology to develop inbound calling metrics that assist in identifying potential customer service improvements and staffing needs.

Follow best practices for selection, utilizing a subject matter expert to develop a request for proposals(RFP).
•
•
•
•
•
•
•
•
♦
♦
♦
♦
♦
♦
• Revise and improve the City's inbound call tree to better direct callers •
•
•

Page 328 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
13 | 28
Technology Decision-Making
Principles
The City of Norco is dedicated to providing the highest quality technology-based services in the most cost-effective manner to deliver services effectively and efficiently on a sustained basis that reflects the organization's dedication to excellent customer service. The City will ensure its information systems are maintained in a secure environment, are capable of supporting information technology advancements made by the City and will exist in an integrated environment that fosters an open, collaborative, and unifying culture.

Technology is committed to the values of:

Reliability
Professionalism and Integrity
Efficiency and Effectiveness
Innovation
Excellence
Collaboration and Teamwork
Given Limited IT Resources, the City will focus these resources on the most productive and cost-effective projects.

City departments will agree on a Collaborative Long-Term IT Vision and Strategies, which requires active participation in setting IT priorities through an IT Committee consisting of department leadership.

The City will strive to Maximize Utilization of Existing Systems and prior investments in application software, as well as to expand functionality and seek enhancements to existing applications.

The City is committed to ensuring Sufficient Staff Training and Application Software Knowledge of existing vendor systems.

Department Ownership is fundamental to achieving maximum return-on-investment of applications. Departments recognize the importance of assuming responsibility for managing and implementing their specific core business applications, with the support of IT staff. City departments are committed to taking responsibility for adapting and improving processes to best integrate them with the application software.

Vision / Mission Statement
•
•
•
•
•
•
♦
♦
♦
♦
♦
♦

Page 329 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
14 | 28
IT Initiative Summaries
Technology Planning is a process to assess, research, prioritize, budget, and plan future technology initiatives. Some of the following initiatives are ready for approval and implementation, while others require further assessment and research before the City can make a final determination of priority, resource requirements, and cost-benefit.

Productivity Improvement Many of the following initiatives will have a direct impact on overall productivity within the organization. Some of these initiatives will significantly impact business processes, reducing staff time required to complete certain tasks, while others will ease or speed up delivery of services to City residents.

Reporting and Data Availability Many of the initiatives outlined will have direct impact on the data that is available for reporting and management decision-making. New application systems and in some cases improvement of existing software systems are necessary before certain can be made available.

Infrastructure Improvements
technological infrastructure to provide secure, reliable, and supportable network services to staff and residents. Infrastructure improvements may involve equipment upgrades, cybersecurity enhancements, or operational improvements that are focused efficient and effective delivery of business applications to City users.

The assessment process resulted in over 74 major initiatives and projects, as well as hundreds of recommendations. Combined, there are hundreds of findings and recommendations throughout the report. ClientFirst classified the major initiatives into eight categories, including:

Best Practices Smart
Technologies IT Operations Cybersecurity
Departmental
Applications
and Systems
IT Infrastructure Telecommunications IT Staffing
Introduction
' - The technical initiatives are focused on improving the City's IT Initiative Categories

Page 330 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
15 | 28
The following are the total initiatives by priority and initiative category.

Categories
Best Practices
Departmental Applications and
Systems
Smart Technologies
IT Infrastructure
IT Operations
Cybersecurity
IT Staffing
Telecommunications
Total
•
8 15
3 7
3 3
2 0
41 • •
••
4 7
1 8
1 3
0 4
28 Initiative Totals by Priorities
41 ■ High ■ Medium ■ Low
I Total
4 16
1 23
2 6
3 18
1 5
0 6
0 2
0 4
11 80

Page 331 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
16 | 28
Priorities by Initiative Category
■ High ■ Medium ■ Low

Page 332 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
17 | 28
Key Issues and Initiatives
The following are the key issues and initiatives identified during the planning process. These initiatives could also be considered high priority. The key initiatives listed below either provide long-term building blocks for the success of the plan or mitigate risk. The City has made note of these as the initiatives from this plan that should be kept in the forefront during future implementation of this plan.

Technology
Governance
Technology Governance provides a vehicle for
departments to work together to manage the
Technology Master Plan and coordinate its
recommendations.

Utilizing a Technology Steering Committee mechanism,
departments, City management, and IT can work
together to prioritize and execute the technology plan.

The City should revitalize the Technology Steering
Committee, focusing on departmental application and
business process improvements.

Based on department feedback identifying and
satisfying user training needs should also be a focal
point for the Technology Steering Committee.

User Training
All City Departments expressed a desire for extensive
application software training to improve departmental
operations.

Application software training is a key component in
increasing application utilization and operational
effectiveness and efficiency.

The Technology Steering Committee should gather
department training needs and prioritize.
•
•
•
•
•
•
•

Page 333 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
18 | 28
Enterprise Resource
Planning (ERP)
The ERP system is the set of core applications that are accounting,
financial, and human resources operations.

The ERP vendor recently announced that they are
discontinuing the system and recommending
customers move to their premier mid-market local
government ERP system.

The plan recommends an assessment and process
reviews to properly scope the implementation services
to avoid implementing a system that still does not
adequately meet Finance and other department needs.

Centralized Land
and Parcel
Management
Departments are using a variety of systems to maintain
information related to land and parcel management.

A consolidated parcel database, residing in GIS is
recommended to provide basic land management and
address information for City applications.

The plan recommends creating an inventory of existing
parcel data bases and developing a plan to consolidate
those data bases into a single master data base.

Ongoing support for parcel updates should also be
considered.

Electronic Content
Management System
(ECMS)
The City installed DocuShare for document
management (Electronic Content Management). An
internally developed system is used to store many
types of records requiring retention.

DocuShare is currently not integrated with other city
enterprise systems.

The plan recommends consolidating all document
types requiring retention into a new ECMS system.

The City would benefit significantly from integration of the ECMS with other enterprise systems.
•
used to operate the City's most common
•
•
•
•
•
♦
•
•
•
•

Page 334 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
19 | 28
Enterprise Asset
Management
Replacement (EAM)
An EAM system comprises a suite of modules in a
software application that manages work orders,
preventative maintenance, and asset management of
City infrastructure, including real property, facilities, streets, sidewalks, parks, trails, bridges, drainage,
culverts, etc.

The existing EAM is full featured and capable of
supporting all interested City departments.

During EAM implementation, Parks and Facilities
received minimal training and vendor support.

Key Parks and Facilities business processes
related to asset management and work orders
continue to be manual.

Public Works is interested in mobility tools to expand
system access in the field.

In Parks and Facilities, many key business processes
related to asset management and work orders continue
to be manual.

The plan recommends identifying EAM system gaps
and development of an improvement plan to:

Close gaps between current and desired
processes.

Utilize as requirements for an EAM implementation
for Parks and Facilities.

Asset management systems are one of the five most
complicated systems at a municipality. The City will
reduce risk by contracting with a subject matter expert to assist in the assessment and business process
reviews.
•
•
•
♦
•
•
•
♦
♦
•

Page 335 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
20 | 28
City Hall Cabling and
Data Center
Improvements
In this summary, we combine two initiatives that we
recommend completing jointly City Hall re-cabling
and data center improvements.

During our site visit, we reviewed cabling and the
primary data center, identifying many deficiencies that can undermine the reliability and supportability of City information technology.

Limited documentation of City Hall cabling is
available. The physical installation is such that
tracing those cables is not possible. Staff currently
resort to trial and error when troubleshooting
cabling issues.

As space requirements increased, the City Hall data
center (where the cabling terminates) grew organically, without an overall plan of where racks should be
placed.

Network equipment is located in several racks, limiting staff s ability to effectively troubleshoot issues.

Limited space is available for additional equipment, or the environmental controls required to make the data
center more resilient.

The plan recommends redesigning the data center to
create space for a logical distribution of equipment,
including new cabling.

The plan further recommends re-cabling City Hall to
eliminate potential issues as the cable ages.
•
•
♦
•
•
•
•
•

Page 336 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
21 | 28
GIS Improvements
GIS and spatial maps are a key component in the
GIS also provides critical information and data
including future Smart City initiatives.

GIS systems can be integrated with land management,
asset management, and document management
applications to improve field-based information storage and retrieval.
applications will improve application effectiveness.

GIS maps also provide a data visualization for citizens to access services and information.

Implementation of requested departmental
improvements outlined in the recent GIS Assessment
will provide residents and staff with improved geospatial asset information.

The City does not have a staff position primarily
focused on GIS projects and support.

The plan recommends a GIS-specific Assessment and
Strategic Plan to identify all GIS needs and develop a
multi-year plan to address those needs and provide
ongoing support.

Microsoft Office
(SharePoint/Teams)
The critical communication system of email is provided
by a local Microsoft Exchange email server. Microsoft
Exchange is a unique sub-specialty in which staff has
received limited training.

Microsoft 365 is the cloud-based alternative to onpremise email and can also be utilized for video conferencing, chat, file sharing, and other productivity functions.

The plan recommends moving to Microsoft 365 and
eliminate the need to locally support an email system.

We recommend a phased implementation approach
that would include the implementation of Teams
features, followed by SharePoint for file sharing and
collaboration.
•
•
•
•
•
•
•
•
•
•
•
management of the City's assets and development.
elements that benefit many of the City's operations
• Expanded integration with the City's enterprise

Page 337 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
22 | 28
Disaster Recovery
Planning
The City Disaster Recovery Plan was written in 2016.

The City does not have a Cybersecurity Incident
Response Plan.

Incident Response Planning can reduce the time
required to respond to a cybersecurity issue, potentially reducing its impact.

We recommend the City develop an Incident Response
Plan as soon as practical.

Disaster Recovery Planning has changed recently due
to the prevalence of cloud-based backup and
restoration services.

Once cloud-based recovery has been tested, the
Disaster Recovery Plan should be modified to reflect
changing technology.

Telephone System
Improvements
is obsolete, with limited vendor support.

During our interviews, several departments stated that
the main list number should be improved to
reduce misdirected calls and improve resident service.
to residents and staff, while replacing the telephone
system is a longer-term project.

Business Analysis
and Project
Management Skillset
Needs
The plan outlines business process improvement
needs for the majority of City systems. These
improvements will save staff time and, in many cases,
improve resident services.

The plan also recommends much needed infrastructure
improvements which will be a major focus of current
staff.

Successfully implementing the plan will require
additional business analyst and project management
skills beyond those that are currently available.

There are many manual processes in place that could
be automated without significant investment in
equipment of software.

We believe automation will result in a significant return on investment and improved services.
•
•
•
•
•
•
• The City's telephone system was installed in 2012 and •
"call tree"
• Improving the "call tree" will provide immediate benefits •
•
•
•
•

Page 338 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
23 | 28
Summary Plan Budget Analysis
The Technology Assessment budget is not an entirely new set of spending requirements. The plan encapsulates all information technology issues and the needs of all departments in the City. Some initiatives are normally funded by departments themselves, and some may already have capital reserves set aside, while others are part of the normal annual IT budgeting process. These are estimated budgets for each project initiative. All project approvals will follow normal City annual budget request and procurement policies and procedures required by the City.

Budgets by Initiative Category
I
I
Categories FYE 2023 FYE 2024 FYE 2025
B,est Praciioes $ 20,000 $ 40,000 $ 25,000
Departmental Applications a:nd $ 11 1,483 $ 818,5S2 $ 567,262 Smart Technologies $ - $ 55,000 $ 80,000
IT Infrastructure $625,000 $ 470,000 $ 877,500
IT Operations $ 41,500 $ 60,500 $ 70,500
Gybersecu rity $ - $ 134,000 $, 25,000
IT Staffing $ 136,616 $ 142,624 $ 146,753
Telecommunications $ - $ 14,500 $ 113,000
Totals $ '934,599 $1,735,206 $ 1,905,015
Recommended 5 Year Plan
$2,000,000
S1 ,750 ,000
$1 ,500.000
$1,250,000
$1,000,000
$750,000
$500,000
$250,000
so FYE 2023 FYE 2024 FYE 2025 FYE 2026
FYE 2026
$ 25,000
$ 459,776
$ 70,000
$ 975,000
$ 69,500
$ 25,000
$ 151,006
$ 38,000
$ 1,813,282
FYE 2027
FYE 2027 Totals
$
$
$
$
$
$,
$
$
$
15,000 $ 125,000
437,479 $2,394,582
75,000 $ 280,000
155,000 $3,102,500
67,500 $ 309,500
25,000 $ .209,000
155,386 $ 732,385
30,000 $ 195,500
000,365 $7,348,467
IT Staffing
Telecommunications
■ Cybe1Security
IT Operations
IT Infrastructure
■ Smart Technologies
■ Departmental
Applications and
Systems
■ Best Practices

Page 339 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
24 | 28
Budgets by Priority and Fiscal Year
$1 ,500,000 -<
"~"' j
High Priority
Medium Prior[1),
Low Priority .

Totals
$1 ,000,000 V---
$750,000
$500,000
$250,000
$0
FYE 2023
FYE 2023 FYE 2024 FYE 2025 FYE 2026
$734,500 $1,3-5.8,206 \ : • ' I $852,032
$200,000 $377,000 $186,250
$0 $0 $125,000 $775,000
$934,599 $1,735,206 $1,905,0 5 $1 ,813,282
Budgets by Priority and Fiscal Year
FYE 2024
■ High Priority
FYE 2025
■ Medium Priority
FYE 2026
■ Low Priority
FYE 2027
$821 ,265
$119,100
$.20,000
$000,365
FYE 2027

Page 340 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
25 | 28
Conclusion
Moving forward over the next 18 to 24 months, the key areas of focus for information technology include redesigned City Hall data center
and cabling, upgraded data network, an
, and cybersecurity
enhancements.

Also recommended are implementation of
a Technology Governance methodology,
creation of a central parcel data base and
replacement of the ERP and Land
Management systems.

Developing a Cybersecurity Incident Response Plan and updating the Disaster Recovery Plan will also be critical components of a successful Technology Plan implementation.

This report contains ambitious and costly technology objectives for the City. If the City chooses to implement these systems rapidly, organizational change management and strategic oversight with agencies on these
issues during assessment, planning, and implementation. We have found slow and steady progress following best practice methodologies leads to improved likelihood of success, higher quality implementations, and improved staff utilization and data management of new systems.

Cybersecurity Cybersecurity resource demands continue to increase. Developing policies and procedures, expanding the C cybersecurity toolset, and improving resiliency and recoverability are important components of a cybersecurity program that will reduce risk of compromise and improve recoverability.

Application Utilization City departments want to improve their core business processes and fully utilize their applications. The City should work to encourage a sense of application ownership and continuous improvement by the departments. Improved application utilization is the most effective way to increase data availability, staff productivity and improve customer service.

IT Staffing City IT staff have many responsibilities. Expanding business analysis and project management capabilities will provide IT staff with additional skills necessary to assist departments in making business process and application improvements. Defining and recruiting for a Business Systems Analyst position will provide a focal point for business application implementation and improvement at the City.

It is expected that the projects outlined in this report to result in improved productivity and customer service, as well as improved resiliency and sustainability.

Third-party subject-matter experts will be helpful for projects that are high priority, beyond the scope of City skill sets, and/or lacking internal resource availability.

The City should review and update the Plan annually, using an abbreviated version of this assessment and planning methodology. In this way, the plan will be a vehicle to continuously guide the information technology activities of the City. Annual plan updates should be properly represented.

Moving Forward
improved "call tree "
Organization Strategies, Goals, and
Objectives
Data and Business Processes
Core Business Appl and Systems
IT Infrastructure and Services
will be critical to the City's success. In many cases, we continue to work ity's
Technology
Master
Plan
synchronized with the City's annual budget process, so technology initiative costs can be

Page 341 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
26 | 28
The completed Plan should not be viewed as static, but rather as a dynamic tool to be revised and updated as business conditions and requirements change. If the planning function is not an ongoing process, certain objectives and benefits will not be realized, because the objectives themselves may change as the organization and its environment evolves.

Major benefits that should be realized through the implementation of this Technology Assessment and Plan include:

Increased collaboration and communication on technology projects within the organization understanding, knowledge, and stewardship of
information technology
Clear direction for IT operations and technology projects for the next several years, focused Citywide department consensus and understanding of all technology initiatives and their priorities
A roadmap for the selection, implementation, and improvement of business applications to better serve residents and staff
It is recommended that the City create a Technology Steering Committee to begin work by reviewing the Plan and budget and advising on priorities. Next, assign lead and participatory resources to the top priority technology initiatives, as well as all other high-priority initiatives.

Initiative leaders should report status updates for active initiatives to the Technology Steering Committee as part of each meeting agenda.

Major issues for each initiative should be discussed by the Committee providing general feedback, collaboration, and lessons learned, as many of the initiatives cross departmental boundaries.

In order to improve application utilization, management, and support, it is also recommended a series of training seminars be developed for key department stakeholders and enterprise business application users. This is an effective way to maintain momentum and kick off the tremendous change that is to occur in improving operations and constituent services.

Benefits
•
• Transformation of the organization's overall
•
on meeting the organization's needs
•
•
Immediate Next Steps

Page 342 of 375 ends

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
27 | 28
Technology Master Plan Capital
Budget
The following section provides the five-year master planning budget detail by project initiative.

Please note these subtotals are not the annual IT Department operating budget. These are estimated budgets for each project initiative. All project approvals will follow normal City annual budget request and procurement policies and procedures required by the City.

Page 343 of 375 ends

Initiative
No.

Priority Cl/EN

TFJRST TECHNO LO GY CONSU LTING
Technology Initiatives
Best Practices
Technology Governance
Comments
Best Practice framework for managing
technology systems and services and
Technology Master Plan
Technology Master Plan
Budget
Bud et Ran e
H
--
$5,000 $10,000
··
IT Fund IT
1---1------------------------limplementation oversight. 2 IT Project and Services Portfolio
3 Project Planning and Implementation Best Practices
4 Applications Management Best Practices
5 Business Process Reviews 6 Enterprise Reporting Best Practices 7 User Training and Support
8 Training Room
9 Software Selection Best Practices
10 Enterprise Applications Implementation Best Practices Develop and maintain a IT project
portfolio and Service Level
Agreements for IT systems and
services.

Follow PMI based project management
principles for all larger or complex
ro·ects.

Ongoing application support and
continued assistance with enterprise
system reporting will be critical for
implementation and full utilization of
ente rise a ication s stems.

Best practices approach to
assessment of departmental operational needs to gain efficiencies, productivity, and constituent services
through the improved utilization of
software a lication s stems
Best practices approach and methods
to utilizing different reporting and
business intelligence tools with
ente rise a ication s stems
Ongoing Departmental application
s~stem training budget ear-over- ear
Space allocated for an training room
with preconfigured computers on a
continual bases
Best Practice focused on reducing risk
and improving software selection
outcomes while maximizing value
through a competitive selection
process. When done prope~y and
then implemented well, will result in
higher utilization of systems and reduction in manual recesses.

L
L
H
M
H
H
M
H
Follow PMI based project management
and change management principles for H all larger or complex projects. $0 $7,500 IT Fund IT
NIA NIA IT Fund IT NIA NIA General Fund All NIA NIA General Fund All NIA NIA General Fund All $0 $25,000 General Fund All $0 $15,000 IT Fund IT
NIA NIA General Fund All NIA NIA General Fund All
5,000
---
15,000 15,000 15,000 15,000 15,000
15,000

Page 1 ends
Page 344 of 375 ends

Initiative
No.

Priority Cl/EN

TFJRST TECHNO LO GY CONSU LTING
11 Mobile Computing
12 Centralized Land and Parcel Data Management
13 User Access Controls
14 Sustainability Planning
15 ITIL (Information Technology Infrastructure Library) Consideration for additional and new
mobile technology utilization
throughout the Cit
See GIS Planning and Improvement
initiative.

Integrate applications with Active
Directory to ease administration and
sign-on processes and get user
licenses across application systems for
an ne that needs access.

Develop a long-range plan to continue
to support applications and underlying technolo with u dates as needed.

ITIL is a standard for delivering IT
services.

All workstations replaced every 4 16 Computer Equipment Replacement Planning __ ..__~~------------------_.,0ec..cac..c rsc.. -"C~urre= ntly considering lease.

De artmental stems
17 Business License Application Improvements
18 Citywide Facilities Scheduling/Events Calendar
19 Contracts Management Software
Improvements to existing system
functionality and user training
Centralized room and facility
schedulin s stem
Creation and management of contract
and agreements, including automated
work flows and a rovals
Citywide document management and
Technology Master Plan
Budget
M
H H
L
M
L
Bud et Ran e
--NIA
N/A
$0 $0

NIA NIA
I

NIA N/A
$15,000
$8,600

NIA NIA
IT Fund IT Fund IT Fund IT Fund
IT Fund
IT Fund
H $5,000 $10,000 General Fund
L $5,000
M $25,000
$25,000 $50,000
IT Fund
Initial Measure
R Ongoing-IT
Fund
Initial Measure

IT IT IT IT IT IT
Fiscal &
Support
Services
IT
All
20 Electronic Content Management System (ECMS) records management system, H $100,000 $250,000 R Ongoing-IT City Clerk 21 ERP System Replacement
22 Bid Management Software 23 Time and Attendance
24 Human Resources System Improvements
includin workflow automations
Replacement of sunsetted solution and
ongoing cloud hosting. Includes
Financials, Payroll, Human Resources, Utility Billing, Time and Attendance and possibly Land Management.

New bids and RFP process
mana ement software
New time and attendance solution
including online timesheets and
supervisors approvals. Includes
integration to the Cit s a roll s stem.

Replacement of sunsetted solution and
ongoing cloud hosting
H $750,000 H $20,000 H Included H Included
Fund
Initial Measure Fiscal &
$1 ,500,000 R Ongoing-IT Support
Fund Services
$25,000 IT Fund All
Initial Measure Fiscal &
Included R Ongoing-IT Support
Fund Services
Initial Measure Fiscal &
Included R Ongoing-IT Support
Fund Services
---
10,000 10,000 10,000 10,000
5,000 5,000 5,000
50,000 15,000 15,000
75,000 50,000 50,000 25,000
60,000 500,000 270,000 270,000 270,000
25,000 18,375 19,295 20,260 21 ,275
included with ERP Replacement included with ERP Replacement

Page 2 of 6 ends
Page 345 of 375 ends

Initiative
No.

Priority Cl/EN
TFJRST

TECHNOLOGY CONSULTING
Technology Master Plan
Budget
I Technology Initiatives Comments
-----------------------------------
Bud et Ran e
25 Performance Evaluation Software
--
26 Applicant Tracking and Onboarding 27 Enterprise Asset Management (EAM) System Improvements 29 Land Management System Replacement 30 Electronic Plan Submittals and Reviews
31 New Permit Pre-Application Processing Software
32 Animal Control Management Software 33 Parks and Recreation System Improvements 34 Event Management Software Implement online work flow automation M
Recruitment management and
onboarding software solutions
Conduct a needs assessment(s) and
work with the vendor to
M
H
Replacement of sunsetted solution and H
ongoing cloud hosting
Electronic development and permitting
plan reviews and markups. Some
Land Management solutions package
this functionalit .

An intuitive and user friendly web
based portal to guide residents and
business through the permitting
recess.

Improvements to the Chameleon
animal shelter software solution
Improvements to the City's recreation
mana ement software solution
Citizen portal and events management
software solution including potential
ticketing and payment processing.

Plus transaction fees.

Assessment and implementation of a
M
M
H H H
$15,000 $30,000 $15,000 $30,000 $25,000 $75,000 $15,000 $25,000 Included Included
$20,000 $40,000 $20,000 $35,000 $73,000 $90,000 $10,000 $25,000 $25,000 $50,000 Initial Measure
R Ongoing-IT
Fund
Initial Measure
R Ongoing-IT
Fund
General Fund
IT Fund
Initial Measure
R Ongoing-IT
Fund
Initial Measure
R Ongoing-IT
Fund
Initial Measure
R Ongoing-IT
Fund
General Fund General Fund General Fund
35 Recreation Staff Scheduling System scheduling and shift tracking software H $2,500 $10,000 General Fund 36 Centralized Building, Door, Gate Access Control 37 Centralized HVAC Monitoring/Management System 38 Intranet New AutoCAD Licenses
Smart Technolo ies
39 Smart Cities Technology Strategies
solution
Improved automation and security at
all Cit facilities
Centralized systems management
Improvements to the overall intranet
s stem functionalit
New AutoDesk software licenses
Develop strategies and priorities for
H
M
H H
numerous smart technologies prior to L
lanning and fundin .

Measure R
$8,000 $25,000 Measure R
Ongoing IT Fund
$7,500 $10,000 IT Fund
$0 $50,000 IT Fund
Human
Resources
Human
Resources
Facilities &
Maintenance
IT
Fiscal &
Support
Services
Community
Development
Public Works
Community
Development
Public Works
Animal 12,000 Services
Community
Services
Facilities &
Maintenance
Community
Services
Facilities &
Maintenance
Facilities &
Maintenance
IT 6,000 IT 8,483 IT
---
1 25,000 5,000
25,000 15,000
50,000 25,000
25,000
included with ERP Replacement
25,000 25,000
15,000
50,000
10,000
6,300
8,907
10,000 12,000 10,000
TBD
10,000
25,000
6,615
9,352
15,750 10,000 10,000
20,000
12,000
TBD
10,000
6,946
9,820
5,000
16,600 10,000 10,000
20,000
12,000
TBD
10,000
7,293
10,311

Page 3 of 6 ends
Page 346 of 375 ends

Initiative
No.

Priority Cl/EN

TFJRST TECHNO LO GY CONSU LTING
I Technology Initiatives Comments
llllill~ I , - ,-
41 Kiosks
42 Electronic/Di ital Si natures 43 GIS Planning and Improvements Translation Technology Solution
IT Infrastructure
44 Video Surveillance System Improvements 45 Computer Room and Power Distribution Improvements 46 Conference and Meeting Room Audiovisual Senior Center AudioMsual
Banquet Facility AudioMsual Pole Barns Facility AudioMsual 47 Converged Network Design 48 Core Switch Replacement 49 Council Chambers Audiovisual 50 Electronic Mail U rade
51 Internet Bandwidth
52 Microsoft 365- Future Upgrades
53 Server and Disk Storage Upgrade
Constituent access to City online
services. Reducing staff time spent
assisting residents, kiosks can be very
beneficial during busy times or at nonstaffed facilities.

Annual subscri lion and inte ration.

GIS assessment and planning
including data availability, reporting,
licensing, staffing, and other resource
requirements. Implementation of
rioritized and funded im rovements.

Translation solution for in-person
communications at City'-H'"'"a"-11 __ ___.

Expansion and centralized monitoring
and management of security
surveillance throughout City facilities.

Bid documents Year 1, implementation
Year 2.

Recommend concurrent with City Hall
Structured Connectivit S stem
Improvements overtime. $10K per
conference room budget.

Seating for 85 people Seating for 400-600 people
Multiple audioMdeo feeds throughout
inside of facilit
Converge site to site fiber and City
administrative network. Concurrent
with core switch re lacement
Concurrent with converged network
design
Wireless now, joint City/District council
chambers u grade in future ear.

Design and assistance moving to
OneDrive and SharePoint
City Hall and SCADA year 1
Technology Master Plan
Budget
Bud et Ran e
M
--
$0 $25,000
L $5,000 $25,000
H $5,000 $15,000 H $25,000 $35,000 H $10,000 $10,000
M $250,000 $500,000 M $75,000 $150,000 M $40,000 $40,000 M $15,000 $25,000 M $50,000 $100,000 M $50,000 $350,000 H See below See below H $75,000 $150,000
L $50,000 $100,000
H Ongoing Ongoing H N/A N/A H $0 $25,000 H $100,000 $200,000 IT Fund IT Fund
Initial Measure
R Ongoing-IT
Fund
IT Fund
Measure R Measure R
IT Fund
Measure R Measure R Measure R
IT Fund IT Fund IT Fund IT Fund IT Fund IT Fund
Water Sewer
Funds
---
IT
t 10.~ t 5,000
IT 10,000 10,000 10,000 10,000
All 35,000 50,000 50,000 50,000 All 10,000 10,000 10,000 10,000 Facilities &
Maintenance 50,000 350,000
Facilities &
Maintenance 25,000 25,000 50,000
IT 10,000 10,000 10,000
Facilities &
Maintenance 15,000 10,000
Facilities &
Maintenance 25,000 25,000
Facilities &
Maintenance 200,000 50,000 50,000
IT IT 80,000 10,000 10,000 IT IT 120,000 120,000 120,000 120,000 120,000 IT 25,000 25,000 25,000 25,000 25,000 IT 10,000 5,000 5,000 5,000 IT 200,000 10,000 5,000 Page4 of 6

Page 347 of 375 ends

Initiative
No.

Priority Cl/EN

TFJRST TECHNO LO GY CONSU LTING
54 Structured Connectivity System 55 Technology Support for the EOC 56 Fiber O tic Assessment 57 Ingalls Park Wireless Network 58 Wireless Network Improvements (Wi-Fi) IT O erations
59 IT Asset Management Automation
60 Help/Service Desk Ticketing System
61 IT Operations• Enterprise Management Platform
Technology Master Plan
Budget
Comments
Recommend concurrent with
Computer Room and Power
Distribution EOC Call Center when phone system
upgraded. Additional video
conferencing in future ear.

Fiber o tic network documentation
Project depends on coverage and
bandwidth.

Expand wireless networks to cover all
City facilities, including public wireless
access.

M
L
M
L
H
lnvento necessa atching info M
Expand to use inbound email. Replace L
BMC Track-IT in future ear.

Automation tools for daily IT
monitoring and management systems. H
AD Audit year 1, log management
SEIM solution future ear.

Bud et Ran e
--
$150,000
$10,000 $25,000
$500,000
$25,000
$1,500 $5,000
$250,000
$50,000 $50,000
$1 ,000,000
$50,000
$5,000
$15,000
Ongoing
t--6_2-+-IT_P_o_lic_ie_s_a_n_d _Pr_o_ce_d_ur_e_s _____________ +-D_e_ve_lo~ IT~ o_lic_ie~s_an_d~ ro~ced~ u_re~s.--t H Automation and remote management
software to manage City owned mobile H
devices.
$0 $8,600
63 Mobile Device Management
Cybersecurity
64 Backups 65 Disaster Recovery Planning 66 IT Security Assessment 24/7 Systems Security Monitoring Solution
67 SCADA Security 68 Two-Factor Authentication 69 Windows Active Directory Unitrends to be implemented in FYE
2022. Replace backup server in EOC,
place on separate network behind
firewall.

Develop a Disaster Recovery Plan to
outline steps required to recover from
si nificant s stem loss.

External penetration completed
annually. Need internal pen test.

Securit Assessment se arate.

Managed IT systems security
monitorin and detection solution
When upgrade complete, conduct
securit assessment.

Implementing 0365 MFA, next steps,
SO MDCs and VPN.

Upgrade with server upgrade. Data
Center licensin bud eted here.

Setup with 0365
H $15,000 $25,000
M $0 $15,000
H $25,000 $35,000
Ongoing
H $25,000 $50,000
M $5,000 $10,000 M $10,000 $25,000
Measure R IT
---
35,000 127.500 1
IT Fund IT 10,000 10,000
Measure R IT 35,000 Measure R IT 100,000 750,000
Initial Measure
R Ongoing-IT IT 50,000 5,000 5,000 5,000
Fund
IT Fund IT
t IT Fund IT
2,500 2,500 2,500 2,500
15,000 15,000 15,000
IT Fund IT 41,500 55,000 55,000 55,000 55,000 IT Fund IT 3,000 3,000 2,000 IT Fund IT IT Fund IT 9,000
IT Fund IT 15,000 IT Fund IT 25,000 5,000 5,000 5,000
Water Sewer IT 50,000 10,000 10,000 10,000 Funds
IT Fund IT 10,000 10,000 10,000 10,000 IT Fund IT 25,000

Page 5 of 6 ends
Page 348 of 375 ends

Initiative
No.

Priority Cl/EN
TFJRST

TECHNOLOGY CONSULTING
Technology Initiatives Comments
IT Staffing
70 IT Staff Training Include CBT Nuggets and one class er staff member. 71 IT Staffing Includes benefit costs.
72 Business Analysis and Project Management Skillset Needs Business Systems Analyst skills and roles descriptions.

Telecommunications
73 VoIP Phone System Improvements Interim staff training and budgeted future hone s stem re lacement Call Flow Redesign Redesign, documentation and training assistance Riley Gym Intercom Improvements Intercom implementation including s eakers Improving field staff radio
74 Radio System Improvements communications for personal safety and office communications
... -· ... . ..

General Fund
Measure R
Initial Measure R Ongoing-IT Fund
IT Fund
Water Sewer Funds
Technology Master Plan
Budget
Bud et Ran e
H
--
$5,000 $15,000 ·· IT Fund IT
H $100,000 $130,000 IT Fund IT
See Above
M $75,000 $125,000 Measure R IT M $4,000 $6,000 IT Fund IT M $2,500 $3,000 General Fund Community Services Animal M $8,000 $16,000 General Fund Services
SubtotalOther Funding
Sources
3,000
133,616
11 ,232
945,831
38,232
200,000
60,000
447,599
200,000
$945,831
$0
---
5,000
137,624
4,000
7,500
3,000
11,569
1,746,775
189,569
239,000
710,000
548,206
60,000
$1,746,775
$0
5,000
141,753 105,000
11 ,916
1,913,931
83,916
817,500
475,000
522,515
15,000
$1,913,931
$0
t
5,000
146,006
30,000
12,274
1,822,555
49,274
830,000
440,750 492,532
10,000
$1,822,555
$0
5-Year Totals
t
5,000
150,386
30,000
12,642
978007
49,642
30,000
416,600 471,765
10,000
$978,007
$0
$7 407100

Page 6 of 6 ends
Page 349 of 375 ends

City Council

STAFF REPORT
Date: July 6, 2022 Agenda Item:

5.C.

To: Honorable Mayor and City Council Members
Prepared By: Andy Okoro, City Manager
Department: Administration
SUBJECT:

Strategic Plan Direction #3, Action Plan #1.4: Economic Development Advisory Council RECOMMENDATION:

Adopt the subcommittee's recommendation to disband the existing Economic Development Advisory Council and establish a new City Manager-led economic development working group.

SUMMARY:

At its regular meeting of April 6, 2022, the City Council created a subcommittee to work with City staff to address Strategic Plan Direction #3, Action Plan #1.4 and review the structure, composition, role and responsibilities of the Economic Development Advisory Council. After reviewing the restrictions associated with the current Economic Development Advisory Council format, the internal economic development efforts of comparable municipalities, and Norco's current and future economic development goals and opportunities, the subcommittee recommended that the existing Economic Development Advisory Council be disbanded. The subcommittee recommended that a new City Manager-led economic development working group be established to assist with Norco's economic development efforts.

BACKGROUND:

The City of Norco's Economic Development Advisory Council (EDAC) was created by the City Council in 1990 to help coordinate an ongoing development strategy aimed at increasing sales tax revenues and improving the economic viability of the City. According to City of Norco Resolution 90-39, the purpose of the Economic Development Advisory Council is "to propose, prepare, and adopt recommendations to the City Council for the improvement of the economy within the City of Norco which will result in the creation of new jobs and other benefits to all the residents of the City so as to help make the City of Norco a better place to live and work, while retaining the City's rural lifestyle."

Page 350 of 375 ends

Since the creation of the Economic Development Advisory Council, the commercial development process has become more confidential and numerous changes have been made to the EDAC membership composition. These circumstances have restricted the governmental body from achieving its purpose.

Strategic Plan
On February 16, 2022, the Norco City Council adopted the 2022 Strategic Plan, which is a document that guides City decisions and actions over a multi-year period. The 2022 Strategic Plan consists of five strategic directions that are dedicated to fulfilling the organization's mission statement and preserving Norco's rural lifestyle. Strategic Direction #3, Economic Development and Financial Stability, includes action plans that will assure financial stability by expanding development efforts, diversifying revenue sources and continuing prudent financial management. This strategic direction includes a corresponding action plan to expand economic development efforts (Action Plan #1) and a sub-action plan to determine the role and responsibilities for the Economic Development Advisory Council (Sub-Action Plan #1.4).

Subcommittee Creation
At its regular meeting of April 6, 2022, the City Council created a subcommittee to work with City staff to address Strategic Plan Direction #3, Action Plan #1.4 and review the structure, composition, role and responsibilities of the Economic Development Advisory Council. The subcommittee was comprised of Council Member Aleman, Council Member Hoffman, the current EDAC Chair, the City Manager, the Communications Manager, the Planning Director and the Senior Planner.

Subcommittee Review
The subcommittee reviewed the internal economic development structure of various Riverside County municipalities with comparable sales tax allocation totals, development opportunities and marketability, including the cities of Banning, Beaumont, Cathedral City, Desert Hot Springs, Hemet, Indio, Jurupa Valley, La Quinta, Lake Elsinore, San Jacinto and Wildomar. Of these cities, one city (Beaumont) currently utilizes a public economic development governmental body, and one city (La Quinta) utilizes a private City Manager subcommittee to discuss economic development efforts. The remaining cities did not have a public governmental body dedicated to economic development and solely addressed economic development efforts internally through Economic Development Department staff.

Subcommittee Recommendation
After reviewing the restrictions associated with the current Economic Development Advisory Council format, the internal economic development efforts of comparable municipalities, and Norco's current and future economic development goals and opportunities, the subcommittee recommended that the existing Economic Development Advisory Council be disbanded. The subcommittee recommended that a new City Manager-led economic development working group be established to assist with Norco's economic development efforts.

Role and Responsibilities: The new economic development working group would assist staff in executing the economic development action plans identified in the 2022 Strategic Plan while identifying and vetting revenue-generating businesses that are compatible with and support Norco's unique animal-keeping, rural lifestyle.

Page 351 of 375 ends

Structure: The subcommittee recommended that the working group be overseen by the City Manager. With this structure, meetings would be held privately, as opposed to being held publicly in accordance with the Ralph M. Brown Act. The subcommittee recommended this revised structure so that the membership is able to openly discuss and provide feedback on confidential matters, including conceptual development proposals that are premature for public input.

Composition: The subcommittee recommended that the working group be comprised of six (6) members. The membership would include:
• City Manager
• Council Members (2)
• Planning Commission Member
• Community Members (2)
o Qualifications: Norco residents with valuable expertise in a relevant economic development discipline, such as marketing, hospitality, commercial real estate sales, leasing or development, retail management, or business administration.

Terms: The subcommittee recommended that all members of the working group, excluding the City Manager, be appointed for two-year terms. The subcommittee did not recommend term limits.

Recruitment & Appointment: The subcommittee recommended the following recruitment and appointment procedures:
• City Manager: The City Manager would appoint and/or include appropriate staff to participate in the working group as needed.
• Council Members: The subcommittee did not determine an appointment process for Council Members and is requesting feedback from the City Council. o Option A: The Mayor appoints two Council Members in conjunction with the annual regional board and commission appointments.
o Option B: The City Council as a whole votes to appoint two Council Members, similar to an ad hoc committee.
• Planning Commission Member: The Planning Commission as a whole would appoint a representative every two years. The appointed Planning Commission Member must have at least two years remaining on their term. • Community Members: The City Clerk's Office would conduct recruitment for the two community members. While economic development is a collaborative program amongst Norco's stakeholders, economic development is a staff function overseen by the City Manager, therefore the City Manager would review applications and ultimately appoint the two community members to serve on the working group.

Meeting Schedule: The subcommittee recommended that the working group meet monthly. The City Manager would determine the meeting schedule with input from the membership. The subcommittee recommended that members commit at least two hours per month.

Absence Policy: The subcommittee recommended that the City Manager would review attendance records and has the right to replace community members and/or refer absences to the appointing governmental body (e.g., City Council or Planning Commission) to address absence issues.

Page 352 of 375 ends

Compensation: Currently, the City of Norco offers compensation to commission members appointed by the City Council. The subcommittee did not determine compensation for the City Manager-led working group and is requesting feedback from the City Council.

Conclusion
While the aforementioned recommendations differ from Norco's current format, there is no industry standard for economic development governmental bodies. The subcommittee thoroughly evaluated various options and ultimately determined that this recommendation is an appropriate format for the City of Norco. The subcommittee believes that action should be taken before the City Manager transition takes place so that institutional knowledge can be transferred and utilized to establish an effective structure and process.

FISCAL IMPACT:

There is no fiscal impact.

RELATIONSHIP TO STRATEGIC PLAN:

This item is related to Strategic Plan Direction #3 Economic Development and Financial Stability: Assure financial stability by expanding development efforts, diversifying revenue sources and continuing prudent financial management.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Andy Okoro, City Manager
Approved as to Form: John Harper, City Attorney

Page 353 of 375 ends

City Council

STAFF REPORT
Date: July 6, 2022 Agenda Item:

5.D.

To: Honorable Mayor and City Council Members
Prepared By: Alma Robles, Planning Director
Department: City Council
SUBJECT:

Discussion item on residential Cottage Food Operations (CFOs) and Microenterprise Home Kitchen Operations (MHKOs)
RECOMMENDATION:

Receive and file the information on Cottage Food Operations (CFOs) and Microenterprise Home Kitchen Operations (MHKOs).

SUMMARY:

State law mandates that both CFOs and MHKOs be allowed in residential zones. The Riverside County Department of Environmental Health enforces the heath requirements and issues permits for food handling for CFOs and MHKOs. The City of Norco is responsible for administering any applicable zoning regulations and issuing a business license.

BACKGROUND:

Below is a brief summary of a CFO and an MHKO:

Cottage Food Operation (CFO):
• The Cottage Food Bill, AB1616, allows certain low-risk food products to be prepared and packaged in private home kitchens in California. The Cottage Food Bill, also known as the California Homemade Food Act, was passed in an effort to help Californians recover from the slow economy, promote small scale businesses and create jobs. This type of operation is called a CFO; • Only low-risk food products that are non-potentially hazardous are allowed for a CFO. These types of products do not require refrigeration and are considered safe from rapid bacterial growth that can cause sickness (ref. Exhibit A); • Two Classes:
o Class A: CFOs may engage in a direct sale of cottage food products. A direct sale is a transaction between the CFO operator and the consumer via the phone, internet, or any other digital method and may be fulfilled in

Page 354 of 375 ends

person, via mail delivery, or using any other third-party delivery service.

Direct sales may take place at bake sales, certified farmers’ markets, and/or temporary events.
o Class B: CFOs may engage in direct and indirect sales of cottage food products. An indirect sale is where a consumer purchases a cottage food product made by a cottage food operator at a third-party retailer and may be fulfilled in person, via mail delivery, or using any other third-party delivery service. A retail food facility that holds a valid health permit including markets, restaurants, bakeries, and delis are third-party retailers; • Both Classes must self certify that they comply with the zoning requirements of their jurisdiction;
• There are currently eight County approved CFOs in the City of Norco (Seven Class A and One Class B) and they all have City of Norco Home Occupation Business Licenses;
• The type of license that is issued to facilitate a CFO in the City is a Home Occupation Business License. Existing zoning criteria in Chapter 18.32 - "General Provisions - Home Occupations" of the Norco Municipal Code (NMC) has been applied to CFOs since they do not preclude a CFO from operating in the City (ref.

Exhibit B).

Microenterprise Home Kitchen Operation (MHKO):
• Assembly Bill (AB) 626 effective January 1, 2019 amended the California Health and Safety Code to establish a “Microenterprise Home Kitchen Operation”, as a new type of retail food facility that will allow an individual to operate a restaurant in their private residence;
• Allows the actual serving of meals on the premises;
• Is a food facility that is operated by the resident of a private home. Food can be stored, prepared, and served to customers at the MHKO. Food has to be made, cooked, and served on the same day, with no more than 30 meals per day, or a total of 60 meals per week. Attached is a County handout with more information on operational requirements an MHKO (ref Exhibit C);
• Allows one full-time employee (not including family or household members); • Cites cannot prohibit MHKOs in residential zones (Chapter 18.32 would not be applicable); and
• There are currently no County approved (legal) MHKOs in the City.

In conclusion, CFOs have been operating in the City of Norco via County approval and approval of a City of Norco Home Occupation Business License. Health/food handling related issues will always be referred to the County for compliance. For MHKOs, a business license would need to be issued, however, limitations on the operation would be those outlined by the County.

FISCAL IMPACT:

No Impact, being presented for information and discussion.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Plan Direction No. 4 - Communication and Stakeholder Experience: Enhance the stakeholder experience, engage the community, and build brand awareness through proactive, effective and consistent communication.

Page 355 of 375 ends

REVIEWED AND APPROVED BY:

ATTACHMENT(S):

Exhibit A
Exhibit B
Exhibit C

Page 356 of 375 ends

State of California—Health and Human Services Agency
California Department of Public Health
TOMÁS J. ARAGÓN, MD, DrPH GAVIN NEWSOM
Director and State Public Health Officer Governor
APPROVED COTTAGE FOOD LIST – DECEMBER 6, 2021
Cottage Food Operations are allowed to produce certain categories of non-potentially hazardous foods. These are foods that do not support the rapid growth of microorganisms or toxins that could make people sick when the food is held outside time and temperature control. The California Department of Public Health (CDPH) is responsible for maintaining the Approved Cottage Foods List and may add or delete food categories. Notice of any change, the reason for the change, and the nature of the change is posted on our Cottage Food Operations webpage. Changes become effective 30 days after the notice has been posted. Questions about the Approved Cottage Foods List may be submitted to [email protected] .

1. BAKED GOODS WITHOUT CREAM, CUSTARD, OR MEAT FILLINGS.

Examples:

Bagels * Baklava * Biscuits * Bread * Brownies * Buns * Cake * Churros * Coconut Macaroons * Cookies * Crackers * Cupcakes * Donuts (fried or baked) * Empanadas (fruit only) * Flatbreads * Fruit, Nut, or Seed Bars * Macarons (with approved buttercream) * Muffins * Pastries * Pies (fruit only) * Pizzelles * Quick Breads * Samosas (fruit only) * Tamales (fruit only) * Tarts * Tortilla * Torts * Waffles (fried or baked) * Waffle Cones

2. CANDY AND CONFECTIONS. Examples:

Brittles * Candied Apples * Candied Popcorn (balls, caramel, chocolate) * Caramels * Cotton Candy * Chocolate-Covered Non-Perishables (including:
marshmallows, nuts, candy, dried fruit, potato chips, or any combination) * Edible Dessert Sprinkles (including: sanding and crystalized sugars, non-pareils, confetti, sequins, dragees, sugar-shapes, sugar-strands (jimmies), comfits, mini-chocolates, and pralines) * Freeze-Dried Candies * Fudge * Ground Chocolate * Hard Candy * Marshmallow Bars * Marshmallows (without eggs) * Popcorn Balls * Salted Caramels * Spiced Sugar * Toffee

3. EXTRACTS CONTAINING AT LEAST 70 PROOF OR 35% FOOD-GRADE FOR HUMAN CONSUMPTION ETHANOL/ALCOHOL. Only those listed or combinations of those listed are allowed.

Apple * Apricot * Blackberry * Blueberry * Cherry * Chocolate * Clove * Cinnamon * Cranberry * Grapefruit * Lemon * Lime * Orange * Peach * Pear * Pineapple * Pomegranate * Raspberry * Strawberry * and Vanilla Food and Drug Branch* P.O. Box 997435, MS 7602, Sacramento, CA 95899-7435* (916) 650_6500

EXHIBIT A

Page 357 of 375 ends

4. DRIED, DEHYDRATED, AND FREEZE-DRIED FOODS. Examples:

Baking Mixes * Bean Soup Mixes * Cereals * Coffee (roasted or freeze-dried) * Fruit * Fruit Powders * Fruit Roll-Ups * Grain Mixes * Granola * Ground Chocolate * Herbs and Herb Butters * Hot Chocolate Mix * Mole Paste * Pasta * Popcorn * Potato Chips * Seasoning Salt * Spice Mix or Rubs * Tea * Trail Mixes * Vegetables * Vegetable Chips * Vegetable Soup Mixes

5. FROSTINGS, ICINGS, FONDANTS, AND GUM PASTES THAT DO NOT CONTAIN EGGS†
, CREAM, OR CREAM CHEESE. Examples:

Buttercream (traditional, vegan and chocolate) * Fondant (regular and chocolate) * Flat Icing * Gum Paste (pasteurized eggs only) * Edible Images * Sugar Glazes * Vegan Gum Paste
†
Frostings and Icings made with meringue powder, powdered eggs, or pasteurized eggs are allowed

6. HONEY AND SORGHUM SYRUPS. only pure no additional ingredients are allowed

7. FRUIT BUTTERS, JAMES, JELLIES THAT COMPLY WITH PART 150 OF TITLE 21 OF THE CODE OF FERDERAL REGULATIONS (only those fruits listed in the CFR are allowed. Additional fruits or vegetables will not be approved)

8. NUTS, NUT MIXES, AND NUT BUTTERS.

9. POWDERED DRINK MIXES MADE FROM MANUFACTURED INGREDIENTS. (drink mixes cannot be labeled with “protein” because the amount cannot be determined)

10. VINEGARS AND MUSTARDS. Examples:

Mustards (plain without eggs) * Vinegars * Fruit-Infused Vinegars (only high-acid fruits such as: apple, blackberry, blueberry, cherry, crabapple, cranberry, grape, gooseberry, grapefruit, huckleberry, kumquat, lemon, lime, loganberry, nectarine, orange, peach, plum, pineapple, pomegranate, quince, raspberry, strawberry, tomatillo, youngberry

APPROVED COTTAGE FOOD
LIST December 6, 2021

Page 358 of 375 ends

Chapter 18.32
GENERAL PROVISIONS—HOME OCCUPATIONS
Sections:

18.32.02 Intent and Purpose.

18.32.04 Applicability.

18.32.06 Conditions.

18.32.02 Intent and Purpose.

The purpose of these regulations is to provide for the conduct of home occupations in the residential zones, in such a manner as to be compatible with and not disrupt residential neighborhoods.

18.32.04 Applicability.
(1) The provisions of this section shall not be applicable to persons selling agricultural products from a dwelling or private garage attached thereto, if such sale is being conducted in an A-1 zone or any zone wherein agricultural uses are permitted.
(2) None of the provisions of this section or any sections of the zoning regulations related to home occupations shall permit a home occupation to be conducted in association with a nonconforming residential use. A home occupation associated with a non-conforming residential use is expressly prohibited.

18.32.06 Conditions.

No person shall conduct a home occupation use, in any zone where such use is permitted, unless said home occupation use is conducted in conformity with all of the following criteria:
(1) Said use must be conducted solely within the confines of one dwelling or a private garage on the same lot. When said use is conducted within a private garage on the same lot, the required parking spaces within the garage shall be preserved at all times for the parking of vehicles. When said use is conducted within a garage, the door thereof shall be continually and fully closed at all times.
(2) A home occupation shall not be conducted with the assistance of any persons, who are employed or retained for such by contract or otherwise; provided, however, members of the family residing in the dwelling may so assist.
(3) Persons such as maids, janitors, and gardeners who provide domestic services in the form of maintenance and repair of the dwelling and private garage shall not be considered as engaged in a home occupation.

The Norco Municipal Code is current through Ordinance 1076, passed November 17, 2021.

Norco Municipal Code Chapter 18.32 GENERAL PROVISIONS—HOME OCCUPATIONS Page 1 of 2

EXHIBIT B

Page 359 of 375 ends

(4) No signs associated with such a use shall be allowed, except one sign not greater than 16 square feet in area and subject to all the applicable provisions of Chapter 18.37 (Signs). (5) There shall be no storage of materials, supplies, or equipment related directly or indirectly to a home occupation use outside the dwelling or garage, if the use is conducted in any residential zone of the City. If the use is conducted in any agricultural zone, there shall be no such storage outside the dwelling or garage, unless said materials, supplies and equipment are entirely screened from view by any occupant of property adjacent to any side of the property on which the home occupation use is being conducted, and from public view at any point. (6) In conducting said home occupation, no mechanical equipment shall be used if such equipment makes a noise so loud, unusual or penetrating as to cause discomfort or annoyance to a reasonable person of normal sensitivity and hearing.
(7) No motor vehicles in excess of 11,000 pounds gross weight shall be used in the conduct of a home occupation. For residences where a residence exemption permit has been issued, said vehicle shall not be used in the conduct of a home occupation. Said vehicle shall also not be loaded or off-loaded for purposes of storing or transferring materials at the residence for which the permit was issued (ref. Section 10.16.050(10)).
(8) The home occupation use shall not be such as to require the dwelling or garage in which it is being conducted to be serviced by a greater amount of City of Norco Utility Services than is required to service said dwelling or its use as a residence by the family conducting said home occupation herein.
(9) At the commencement of the home occupation use and during its continuance, there shall be no entrance or exit way specifically provided in the dwelling, garage, or on the premises, for the conduct of the home occupation thereon.
(10) A home occupation use shall not cause greater pedestrian or vehicular traffic to the dwelling and garage in which it is conducted than is normal for the zone in which it is being conducted. (Ord. 961 Sec. 1, 2013; Amended by Ord. 560 Sec. 1, 1986; Amended by Ord. 491, Exhibit A Sec. 3, 1983)
The Norco Municipal Code is current through Ordinance 1076, passed November 17, 2021.

Norco Municipal Code Chapter 18.32 GENERAL PROVISIONS—HOME OCCUPATIONS Page 2 of 2

Page 360 of 375 ends

offices located in : Blythe, Corona, Hemet, Indio, Murrieta, Palm Springs, and Riverside (888) 722-4234 • RIVCOEH.ORG DES-134-19 (Rev 3/21)
Microenterprise Home Kitchen
Operation (MHKO)

COUNTY OF RIVERSIDE

ENVIRONMENTAL HEALTH

A MHKO IS A NEW TYPE OF FOOD FACILITY, LIKE A

MINI RESTAURANT, OPERATED IN A PRIVATE HOME
Only 1 MHKO is permitted per site. The
operator must be the resident of the private
home and is responsible for the operation.

A maximum of 30 meals per day and
60 meals per week can be served* with
an annual sales cap of $50,000
*Environmental Health may decrease meal limits
based on the food preparation capacity of the home
All food must be prepared, cooked, and served on
the same day.

Delivery to the consumer must be done by an
employee of the MHKO, a family member, or
household member of the permit holder.

Food from a MHKO cannot be sold to other
food facilities for resale.

No signage or other outdoor displays
for advertising are allowed. All internet
food service intermediaries used must be
approved by the California Department of
Public Health.

MHKOs may not produce, serve, or use raw milk, serve raw oysters, or any food that would require a HACCP plan.
any Person(s) involved with the
mhKo (EXCEPT FOR THE OPERATOR) Must
oBtain a riverside county food
handler certification. only one fulltime emPloyee, not including family or household memBers, is allowed
While a MHKO operates like a restaurant, the following limitations are placed on these businesses How to Open a MHKO
The MHKO operator shall successfully pass
an approved and accredited food safety
manager certification examination.

Contact an Environmental Health Specialist and submit standard operating procedures with all required documentation.

Submit a MHKO permit application.

Once all the above documents have been reviewed and approved by this department, and the home inspection is complete, the MHKO may be approved to operate.

Schedule an inspection with an Environmental Health Specialist.

The following areas will be inspected: consumer eating area, restroom, janitorial or cleaning facilities, refuse storage area, and attached rooms within the home that are used for food, utensil, and equipment storage. This will also include any vehicles used for transporting food to or from a MHKO.

Detached accessory buildings, including garages and sleeping quarters, enclosed patios, or second units are not allowed to be used for food, utensil, or equipment storage. 1 2
3 4 EXHIBIT C

Page 361 of 375 ends

City Council

STAFF REPORT
Date: July 6, 2022 Agenda Item:

6.A.

To: Honorable Mayor and City Council Members
Prepared By: Alma Robles, Planning Director
Department: Planning
SUBJECT:

First Reading, Ordinance 1083 (City of Norco): A City-Initiated proposal to amend Norco Municipal Code (NMC) Title 18 “Zoning”, to add Chapter 18.70 "Inclusionary Housing Program". Zone Code Amendment 2022-03
RECOMMENDATION:

Adopt Ordinance 1083, First Reading, to amend NMC Title 18 “Zoning”, adding Chapter

18.70 "Inclusionary Housing Program", and schedule the Second Reading on July 20, 2022. Zone Code Amendment 2022-03
SUMMARY:

Continued Public Hearing: The proposed Inclusionary Housing Program would require a certain percentage of units of a proposed residential housing development be affordable, and would allow developers the option of an in-lieu fee to the City rather than providing affordable units as part of their project. While inclusionary housing ordinances are not mandatory under state law, they can provide cities with an effective tool to facilitate and encourage the construction of affordable housing units in the community and help satisfy state mandated affordable unit production requirements under the Regional Housing Needs Assessment (RHNA).

BACKGROUND:

The current General Plan contains goals and policies for the orderly growth and development of the City. In many cases, the goals and policies are presented as items for potential future action by the City Council, subject to timing or funding considerations.

Certain zoning practices, while not intentionally exclusionary, have impacted the production of affordable units. To help address this, many cities throughout the United States, including California, have implemented inclusionary housing as a planning tool to encourage the development of affordable units. To facilitate the production of affordable housing, the State has, since 1980, enacted several laws that, in addition to authorizing

Page 362 of 375 ends

cities to adopt inclusionary housing ordinances, have also mandated local jurisdictions to adequately plan and meet the housing needs of all income levels in their communities.

Prior to the dissolution of redevelopment agencies in California, affordable housing was often funded through a set-aside portion of the tax increment that funded redevelopment agency operations. Since the dissolution of redevelopment several years ago, most cities no longer have dedicated source of funding that can be used for the provision of affordable housing. An inclusionary housing ordinance requires residential developers to make available a portion of their units to low-income and moderate-income buyers or renters. Such a policy would utilize the economic gains from rising real estate values to construct affordable housing for lower income families.

The proposed inclusionary housing ordinance would require a certain percentage of units of a proposed residential housing development be affordable, and would allow developers the option of an in-lieu fee to the City rather than providing affordable units as part of their project. While inclusionary housing ordinances are not mandatory under state law, they can provide cities with an effective tool to facilitate and encourage the construction of affordable housing units in the community and help satisfy state mandated affordable unit production requirements under RHNA.

Proposed Ordinance: Based on the review of other cities’ requirements, staff, in consultation with legal counsel, prepared a draft ordinance that incorporates aspects of other similar ordinances that staff believes to be the most effective in achieving the goal of constructing affordable units (refence attached Ordinance ____ for proposed Chapter

18.70). The draft ordinance is intended to be simple as possible, yet still provide the City with the ability to receive fair market in-lieu payments, should a developer choose to not construct affordable housing units as part of a proposed project.

The proposed inclusionary housing ordinance includes the following:
• Requires that 15% of units within a residential projects be affordable. o 9% of all newly constructed dwelling units shall be sold or rented to low income households.
o 6% of all newly constructed dwelling units shall be sold or rented to moderate income households.
• Units can be provided “on site” as part of the proposed development, or at the discretion of the Director, another location within the City. • Developers can choose to pay an in-lieu fee to the City to be used toward the production of future affordable housing units.

The adoption of an inclusionary housing ordinance has certain advantages, including codifying the inclusionary housing requirement in the Norco Municipal Code, provides the City an additional tool in meeting RHNA numbers, and establishes a standard in-lieu fee calculation. The draft ordinance, if adopted, is generally consistent with inclusionary housing ordinances of other cities, and does not discourage developers from proposing new residential development in the community.

Planning Commission: The Planning Commission recommended approval of the Zone Code Amendment 2022-031 to the City Council on a 3-0-1 (Askey) vote on May 11, 2022.

Page 363 of 375 ends

The Planning Commission considered the information noted above in their determination to recommend approval, but expressed concerns on the following:
• The alternative for the in-lieu fees. The Commission was concerned that allowing in-lieu fees creates an "opt-out" situation where the affordable component of a project just gets passed down the line, and recommended that the City Council pay close attention to the provision for in-lieu fees;
• How the in-lieu fees will be used. The Commission was concerned with miss-use of the fees and recommended that the program include detail use of the fees; and • Definition of the Trust Fund in Section 18.70.22. Planning Commission recommended that this section include more details on the definition of the trust fund.

Should the City Council concur with the Planning Commission's concerns and recommendations, staff will work with legal council to modify any corresponding sections.

CEQA: The adoption of the proposed ordinance adding a new Chapter 18.70, Inclusionary Housing Program, to Title 18 of the Norco Municipal Code, is exempt from review under the California Environmental Quality Act (CEQA) as it is not considered a project under Public Resources Code Section 21065 and CEQA Guidelines Section 15378 because this Ordinance will not result in a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. In addition, even if the adoption of the Ordinance was considered a project under CEQA, pursuant to CEQA Guidelines Section 15061(b)(3), this Ordinance is covered by the common sense exemption providing that CEQA only applies to projects which have the potential for causing a significant effect on the environment and where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. This Ordinance will require future residential projects in the City to set aside a portion of the proposed units to be constructed for affordable housing or pay an in-lieu fee. It does not require additional units to be built. Future residential projects in the City will undergo appropriate CEQA review.

FISCAL IMPACT:

There is no fiscal impact
RELATIONSHIP TO STRATEGIC PLAN:

Adopting the Zone Code Amendment is consistent with Strategic Direction #3 - Economic Development and Financial Stability: Assure financial stability by expanding development efforts, diversifying revenue sources and continuing prudent financial management.

REVIEWED AND APPROVED BY:

ATTACHMENT(S):

Ord 1083, First Reading

Page 364 of 375 ends

ORDINANCE NO. 1083

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF NORCO,

CALIFORNIA, AMENDING NORCO MUNICIPAL CODE (NMC) TITLE
18, TO ADD CHAPTER 18.70 “INCLUSIONARY HOUSING
PROGRAM”. ZONE CODE AMENDMENT 2022-03
WHEREAS, there is a shortage of affordable housing in the City of Norco (“City”) as documented in the 2021-2029 General Plan Housing Element; and WHEREAS, California Government Code Section 65580(d) states that all cities have a responsibility to use the powers vested in them to facilitate the improvement and development of housing and to make adequate provision for the housing needs of all economic segments of the community; and
WHEREAS, consistent with State law, Housing Element Goal 3 is to preserve and improve the City’s existing housing stock and Housing Element Goal 4 is to provide adequate housing in the City for all economic segments of the community; and WHEREAS, adopting clear and objective standards for the provision of inclusionary housing within residential development projects will encourage the development and availability of housing opportunities to a broad range of households with varying income levels within the City, and is essential for the public welfare; and WHEREAS, requiring inclusionary housing will increase the supply of below market rate housing to meet the City’s regional share of very low, low- and moderateincome housing needs and the needs of special groups, including the elderly, disabled, small and large families, and local workers; and
WHEREAS, provision of housing at a variety of income levels will support the local economy by making it easier for employers to attract and retain workers by providing people at all income levels more opportunities to live near where they work; and WHEREAS, provision of housing at a variety of income levels will affirmatively further the policies and purposes of the Fair Housing Act, also known as “Affirmatively Further Fair Housing,” by reducing segregation and concentration of poverty; and WHEREAS, the new Chapter 18.70, Inclusionary Housing Program, authorizes the City Council to adopt an Inclusionary Housing Program in Lieu Fee, which a project developer may, in certain prescribed instances, pay as an alternative to the development and construction of below market rate dwelling units; and WHEREAS, the payment of any Inclusionary Housing in Lieu Fees will be used to finance the development of new affordable housing or the rehabilitation of existing affordable housing and to provide affordable housing programs in the City; and

Page 365 of 375 ends

Ordinance 1083 – Add Chapter 18.70 “Inclusionary Housing Program”

Page 2 ends

July 20, 2022
WHEREAS, the Planning Commission considered the proposed ordinance adding Chapter 18.70 to Title 18 of the Norco City Municipal Code at a noticed public hearing on May 11, 2022 and adopted Resolution 2022-13 recommending City Council approval; and
WHEREAS, the Zone Code Amendment was duly submitted to said City’s City Council for decision at a public hearing for which proper notice was given; and WHEREAS, the Zone Code Amendment was scheduled for public hearing on June 15, 2022 on or about 7 p.m., and continued to July 6, 2022, in the Council Chambers at 2820 Clark Avenue, Norco, California 92860; and
WHEREAS, at the time set, the City Council held a public hearing and received both oral and written testimony pertaining to the Zone Code Amendment.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, does hereby ordain, determine, and order as follows:

A. The adoption of the proposed ordinance adding a new Chapter 18.70, Inclusionary Housing Program, to Title 18 of the Norco Municipal Code, is exempt from review under the California Environmental Quality Act (CEQA) as it is not considered a project under Public Resources Code Section 21065 and CEQA Guidelines Section 15378 because this Ordinance will not result in a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. In addition, even if the adoption of the Ordinance was considered a project under CEQA, pursuant to CEQA Guidelines Section 15061(b)(3), this Ordinance is covered by the common sense exemption providing that CEQA only applies to projects which have the potential for causing a significant effect on the environment and where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA; and
B. The provision of safe and stable housing for households at all income levels is essential for the public welfare of the City. Housing in the City of Norco, both rental and for sale housing, has become steadily more expensive and housing costs have gone up faster than incomes. Federal and State government programs do not provide enough affordable housing to satisfy the needs of very low, low, or moderate-income households. As a result, there is a severe shortage of adequate affordable housing for very low, low, and moderate-income households, as evidenced by the findings in the City’s 2021-2029 Housing Element; and C. The City wishes to encourage the production of additional housing units, including affordable units, through redevelopment of areas already developed with housing by private interests; and

Page 366 of 375 ends

Ordinance 1083 – Add Chapter 18.70 “Inclusionary Housing Program”

Page 3 ends

July 20, 2022
D. The proposed Ordinance adding a new Chapter 18.70, Inclusionary Housing Program, to Title 18 of the Norco Municipal Code is consistent with the 2021-2029 General Plan Housing Element.

SECTION 1: FINDINGS.

Chapter 18.70 INCLUSIONARY HOUSING PROGRAM

18.70.02 Purpose.

18.70.04 Definitions.

18.70.06 Applicability

18.70.08 Inclusionary Unit Requirement.

18.70.10 Alternatives.

18.70.12 Exemptions.

18.70.14 Procedures.

18.70.16 Standards.

18.70.18 Enforcement

18.70.20 Regulations.

18.70.22 Inclusionary Housing Trust Fund.

18.70.24 Administrative Fees.

18.70.26 Taking Determination.

18.70.02 Purpose.

The provisions of this Chapter is to establish standards and procedures that encourage the development of housing affordable to a range of households with varying income levels. The purpose of this Chapter is also to encourage the development and availability of such housing by ensuring that the addition of affordable housing units to the City’s housing stock is in proportion with the overall increase in new housing units.

18.70.04 Definitions.

For purposes of this Chapter, the following definitions shall apply. Unless specifically defined below, words or phrases shall be interpreted as to give this Chapter its most reasonable interpretation.

A. “Adjusted for household size appropriate for the unit” means a household of one person in the case of a studio unit, two persons in the case of a one-bedroom unit, three persons in the case of a two-bedroom unit, four persons in the case of a three-bedroom unit, and five persons in the case of a four-bedroom unit.

B. “Affordable housing cost” means the total housing costs paid by a qualifying household, which shall not exceed a specified fraction of their gross income, adjusted for household size appropriate for the unit, as follows:

Page 367 of 375 ends

Ordinance 1083 – Add Chapter 18.70 “Inclusionary Housing Program”

Page 4 ends

July 20, 2022

1. Very low-income households, rental units: 30% of 50% of the Riverside County median income;

2. Low income households, rental or for-sale units: 30% of 80% of the Riverside County median income;

3. Moderate income households, for-sale units: 40% of 110% of the Riverside County median income.

4. Moderate income households, rental units: 30% of 120% of the Riverside County median income.

C. “Developer” means any person, firm, partnership, association, joint venture, corporation, or any entity or combination of entities, which seeks City approvals for all or part of a residential development.

D. “Director” means the City’s Planning Director or his or her designee.

E. “Discretionary approval” means any entitlement or approval pursuant to Title 18 of this code, including but not limited to a use permit, variance, design approval, and subdivision map.

F. “Inclusionary Housing Agreement” means a legally binding agreement between a developer and the City, in form and substance satisfactory to the Director and City Attorney, setting forth those provisions necessary to ensure that the requirements of this Chapter, whether through the provision of inclusionary units or through an alternative method, are satisfied.

G. “Inclusionary Housing Plan” means the plan referenced in section 18.70.14 and further described in the regulations, which sets forth the manner in which the requirements of this chapter will be implemented for a particular residential development.

H. “Inclusionary Housing Trust Fund” shall have the meaning set forth in section

18.70.22. I. “Inclusionary units” means a dwelling unit that will be offered for rent or sale to lowand moderate-income households, at an affordable housing cost, pursuant to this Chapter.

J. “Low income households” means households whose gross income does not exceed 80% of the median income for Riverside County as determined annually by the U.S. Department of Housing and Urban Development.

Page 368 of 375 ends

Ordinance 1083 – Add Chapter 18.70 “Inclusionary Housing Program”

Page 5 ends

July 20, 2022
K. “Low income units, moderate income units, and very low-income units” means inclusionary units restricted to occupancy by low, moderate, or very low-income households, respectively, at an affordable housing cost.

L. “Market rate units” means those dwelling units in a residential development that are not inclusionary units.

M. “Moderate income households” means households whose gross income does not exceed 120% of the median income for Riverside County as determined annually by the U.S. Department of Housing and Urban Development.

N. “Regulations” means the regulations adopted by the City Council and amended from time to time for the implementation and enforcement of the provisions of this Chapter.

O. “Residential development” means the new construction of projects consisting of:
(i) five or more singe family units or (ii) five or more multi-family dwelling units.

P. “Substantial rehabilitation or substantially rehabilitated” means the rehabilitation of a dwelling unit(s) that has substantial building or other code violations, and has been vacant for at least six months, such that the unit is returned to the City’s housing supply as decent, safe, and sanitary housing, and the cost of such work exceed $40,000 per unit, as that amount may be adjusted for inflation pursuant to the regulations.

Q. “Total housing costs” means the total monthly or annual recurring expenses required of a household to obtain shelter. For a rental unit, “total housing costs” include the monthly rent payment and utilities. For an ownership unit, “total housing costs” include the mortgage payment (principal and interest), utilities, homeowner’s association dues, taxes, mortgage insurance and any other related assessments.

R. “Very low-income households” means households whose gross income is equal to 50% or less of the median income for Riverside County as determined annually by the U.S. Department of Housing and Urban Development.

18.70.06 Applicability.

This Chapter shall apply to all residential development, except those that are exempt pursuant to section 18.70.12. Further, residential development of five and six units shall be exempt from the requirement to provide affordable housing and any associated obligations set forth in this Chapter or the implementing regulations, and instead shall be required to pay an in-lieu fee as described in section 18.70.10 and as set by City Council resolution.

18.70.08 Inclusionary Unit Requirement.