Cities Index.
Agenda

Norco City Council
December 21, 2022

Document
Agenda
Meeting
December 21, 2022
Body
Norco City Council
Pages
329
Original file
25.5 MB
Text extracted from the city's file for reading and search. Open the original on norco.civicweb.net. That file is the official record.

CITY OF NORCO
FIRE PREVENTION SERVICES FEE SCHEDULE Fees last 10% CPI Proposed Service Name Fee Description 2022-23 Fee increased increase 2022-23 Fee Water Systems Permits 7/1/2021
New Underground Fire Line Per Connection 498.00 7/1/2021 49.80 548.00 Fire Pump Per Pump 1,031.00 7/1/2021 103.10 1,134.00
Emergency Underground Fire Line Repair 646.00 7/1/2021 64.60 711.00 Above Ground Tank (Temporary Water Supply/Construction) 461.00 7/1/2021 46.10 507.00 Standpipes/Hose Valves 498.00 7/1/2021 49.80 548.00
Fire Alarm
New Alarm System Base Fee + 478.00 7/1/2021 47.80 526.00 New Alarm System (Per initiating or notification device up to 999 devices) 0 - 999 devices 60.00 7/1/2021 6.00 66.00
New Alarm System (Per initiating or notification device 1000-5000 device fee ) 1,000 - 5,000 devices 3.00 7/1/2021 0.30 3.00 New Alarm System (Per initiating or notification device 5,000 and above fee) > 5,001 2.00 7/1/2021 0.20 2.00
TI Fire Alarm System Base Fee + 358.00 7/1/2021 35.80 394.00 TI Fire Alarm System (Per initiating or notification device) Per device 6.00 7/1/2021 0.60 7.00 Water flow (Monitoring) Alarm system only Per system 308.00 7/1/2021 30.80 339.00 Fire Protection Systems
Special Extinguishing Systems (FM200, Dry Chem, Spray Mist, etc.) Per system 621.00 7/1/2021 62.10 683.00 Smoke Control System - Rationale, Analysis and Plan Review Per system 1,771.00 7/1/2021 177.10 1,948.00 Other Systems
Hood & Duct Automatic Extinguishing System Per System 381.00 7/1/2021 38.10 419.00 Ovens, Industrial baking or drying, furnace or kiln special equip. Per oven 283.00 7/1/2021 28.30 311.00 Dust Collection Special Equipment Per system 321.00 7/1/2021 32.10 353.00 Solar Photovoltaic System (charged hourly or a fraction thereof) Residential 160.00 7/1/2021 16.00 176.00 Solar Photovoltaic System up to 50 Kw (charged hourly or a fraction thereof) Commercial 160.00 7/1/2021 16.00 176.00
Solar Photovoltaic System > 50 Kw (charged hourly or a fraction thereof) Commercial 160.00 7/1/2021 16.00 176.00
16

Page 310 of 329 ends

CITY OF NORCO
FIRE PREVENTION SERVICES FEE SCHEDULE Fees last 10% CPI Proposed Service Name Fee Description 2022-23 Fee increased increase 2022-23 Fee Regulated Refrigeration System Per system
Refrigeration system < 500 lbs. Per system 308.00 7/1/2021 30.80 339.00 Refrigeration system > or = 500 lbs. Per system 381.00 7/1/2021 38.10 419.00 Spray Booth Automatic Extinguishing System Per Booth/System 412.00 7/1/2021 41.20 453.00 Liquefied Petroleum Gases (LPG) Special System Per system 536.00 7/1/2021 53.60 590.00 Gas Systems (Med Gas, Industrial Gas, IPG,) Per system 498.00 7/1/2021 49.80 548.00 Emergency Responder Radio Coverage Per system 455.84 7/1/2021 45.58 501.00 Fireworks Display Actual Cost 672.00 7/1/2021 67.20 739.00 Generator/Cell Sites Per Gen/Site 706.00 7/1/2021 70.60 777.00 Development Plan Check
Battery Systems (Commercial charging system) Per System 481.00 7/1/2021 48.10 529.00 Hazardous Materials Disclosure Review Per Number of Chem.

Chemical Classification Disclosure Review <10 Chemicals 386.00 7/1/2021 38.60 425.00 Chemical Classification Disclosure Review 10 - 25 Chemicals 541.00 7/1/2021 54.10 595.00 Chemical Classification Disclosure Review 26 - 100 Chemicals 859.00 7/1/2021 85.90 945.00 Chemical Classification Disclosure Review >100 Chemicals 1,188.00 7/1/2021 118.80 1,307.00 High Piled Storage
High Piled Combustible Storage 541.00 7/1/2021 54.10 595.00 Access and Water Supply
Access and Water Supply Only - Commercial Construction Inspection Deposit may be required 381.00 7/1/2021 38.10 419.00 Base Time for One Lot 123.00 7/1/2021 12.30 135.00
Each Additional Lot 24.00 7/1/2021 330.00
Fuel Modification Plan (3 hour minimum, hourly thereafter) Deposit may be required 478.00 7/1/2021 47.80 526.00 Tanks (Other than Above Ground Water Tank)
Underground Storage Tanks Install or Removal 308.00 7/1/2021 30.80 339.00 Aboveground Storage Tank Install or Removal 308.00 7/1/2021 30.80 339.00 Alterations to Gas Stations (No tank alterations) 308.00 7/1/2021 30.80 339.00 Fuel Modification for Fire Severity Zones
Fuel Modification Plan/Insp (4 hour minimum, hourly thereafter, plus City Atty) Deposit may be required 626.00 7/1/2021 62.60 689.00 17

Page 311 of 329 ends

CITY OF NORCO
FIRE PREVENTION SERVICES FEE SCHEDULE Fees last 10% CPI Proposed Service Name Fee Description 2022-23 Fee increased increase 2022-23 Fee Other Fees - Includes Pre-Development Reviews
Work without Approval or Permit Per occurrence 223.00 7/1/2021 22.30 245.00 Fire Standby Per hour 148.00 7/1/2021 14.80 163.00
Annexation Agreement 80.00 7/1/2021 8.00 88.00
Revised Tentative Parcel Map 379.00 7/1/2021 37.90 417.00 Alternate Materials and Methods (4 hrs. minimum, hourly thereafter) Deposit may be required 593.00 7/1/2021 59.30 652.00 Consultant Fire Plan Review (*future rate TBD if contracted) N/A 3rd Review and subsequent submittals Per hour 148.00 7/1/2021 14.80 163.00 Expedited/Overtime Plan Review Per hour 223.00 7/1/2021 22.30 245.00 Over the Counter/Misc. Revisions Plan Review Per review 111.00 7/1/2021 11.10 122.00 Development Plan Check
Architectural/Development by Square Footage
Residential and Multi-family Residential Uses
0 - 1,999 sq. ft. 308.00 7/1/2021 30.80 339.00
2,000 - 4,999 sq. ft. 353.00 7/1/2021 35.30 388.00
5,000 - 9,999 sq. ft. 461.00 7/1/2021 46.10 507.00
10,000 - 24,999 sq. ft. 538.00 7/1/2021 53.80 592.00
25,000 - 49,999 sq. ft. 692.00 7/1/2021 69.20 761.00
50,000 - 100,000 sq. ft. 845.00 7/1/2021 84.50 929.00
> 100,000 sq. ft. 1,062.00 7/1/2021 106.20 1,168.00
Hazardous Use by square footage
All newly constructed or added space for hazardous use
occupancies classified as CBC Group H
0 - 1999 sq. ft. 325.00 7/1/2021 32.50 357.00
2,000 - 4,999 sq. ft. 523.00 7/1/2021 52.30 575.00
5,000 - 9,999 sq. ft. 719.00 7/1/2021 71.90 791.00
10,000 - 24,999 sq. ft. 917.00 7/1/2021 91.70 1,009.00
25,000 - 49,999 sq. ft. 1,113.00 7/1/2021 111.30 1,224.00 50,000 - 100,000 sq. ft. 1,309.00 7/1/2021 130.90 1,440.00 > 100,000 sq. ft. 1,592.00 7/1/2021 159.20 1,751.00
All newly constructed or added space for residential occupancies classified as CBC group R (Except R-3) or other residential occupancies not specifically addressed elsewhere in this fee schedule
18

Page 312 of 329 ends

CITY OF NORCO
FIRE PREVENTION SERVICES FEE SCHEDULE Fees last 10% CPI Proposed Service Name Fee Description 2022-23 Fee increased increase 2022-23 Fee Shell Buildings for all Commercial Uses by square footage 0 - 1,999 sq. ft. 308.00 7/1/2021 30.80 339.00
2,000 - 4,999 sq. ft. 353.00 7/1/2021 35.30 388.00
5,000 - 9,999 sq. ft. 461.00 7/1/2021 46.10 507.00
10,000 - 24,999 sq. ft. 538.00 7/1/2021 53.80 592.00
25,000 - 49,999 sq. ft. 692.00 7/1/2021 69.20 761.00
50,000 - 100,000 sq. ft. 845.00 7/1/2021 84.50 929.00
> 100,000 sq. ft. 1,062.00 7/1/2021 106.20 1,168.00
Development Plan Check
Buildings for all Commercial Uses
0-1.999 sq. ft. 308.00 7/1/2021 30.80 339.00
2,000-4,999 sq. ft. 353.00 7/1/2021 35.30 388.00
5,000-9,999 sq. ft. 461.00 7/1/2021 46.10 507.00
10,000-24,999 sq. ft. 538.00 7/1/2021 53.80 592.00
25,000-49,999 sq. ft. 692.00 7/1/2021 69.20 761.00
50,000-100,000 sq. ft. 845.00 7/1/2021 84.50 929.00
>100,000 sq. ft. 1,062.00 7/1/2021 106.20 1,168.00
New Construction, Additions and Major Remodels
Tenant Improvement
0-1,999 sq. ft. 308.00 7/1/2021 30.80 339.00
2,000-4,999 sq. ft. 353.00 7/1/2021 35.30 388.00
5,000-9,999 sq. ft. 461.00 7/1/2021 46.10 507.00
10,000-24,999 sq. ft. 538.00 7/1/2021 53.80 592.00
25,000-49,999 sq. ft. 692.00 7/1/2021 69.20 761.00
50,000-100,000 sq. ft. 845.00 7/1/2021 84.50 929.00
>100,000 sq. ft. 1,062.00 7/1/2021 106.20 1,168.00
Remodeled space for non-residential occupancies classified as for non-residential classified as CBC Group A, B, E, F, I, M, S, or other commercial occupancies not specifically addressed elsewhere.

The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, I, M, S, or other commercial occupancies not specifically addressed where the interior is completed and habitable.

The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, I, M, S, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not complete or occupiable. 19

Page 313 of 329 ends

CITY OF NORCO
FIRE PREVENTION SERVICES FEE SCHEDULE Fees last 10% CPI Proposed Service Name Fee Description 2022-23 Fee increased increase 2022-23 Fee Fire Life-Safety Inspections (Post-Development)
Fire Annual Inspection (includes one re-inspection)
Small 75.00 7/1/2021 7.50 82.00
Medium 148.00 7/1/2021 14.80 163.00
Large 371.00 7/1/2021 37.10 408.00
2nd re-inspection 148.00 7/1/2021 14.80 163.00
3rd and subsequent Re-inspections 148.00 7/1/2021 14.80 163.00 Fire Watch Inspection Per hour 148.00 7/1/2021 14.80 163.00 Fire Hydrant Inspection/Water Flow Witness Per hour 148.00 7/1/2021 14.80 163.00 Special Event Permit 75.00 7/1/2021 7.50 82.00
Tent Permit 75.00 7/1/2021 7.50 82.00
Hourly Rates
Inspection 148.00 7/1/2021 14.80 163.00
Plan Review 148.00 7/1/2021 14.80 163.00
Supplemental Inspection Fee (per 1 hour or potion thereof) 148.00 7/1/2021 14.80 163.00 Supplemental Plan review (per 1 hour or portion thereof) 148.00 7/1/2021 14.80 163.00 After Hours or Emergency call-out (2 hr. minimum = $448) 148.00 7/1/2021 14.80 163.00 Construction Re-inspection Fee 148.00 7/1/2021 14.80 163.00 Operational Fees
Renewable Permit Fees (Issued at Annual Fire-Life Safety Inspection)
Aerosol Products (Level 2 & 3) CFC 105 Permit 56.00 7/1/2021 5.60 62.00 Candles Open Flame in Assembly Occupancy Areas CFC 105 Permit 56.00 7/1/2021 5.60 62.00 Carnivals and Fairs CFC 105 Permit 94.00 7/1/2021 9.40 103.00 Cellulose Nitrate Storage CFC 105 Permit 63.00 7/1/2021 6.30 70.00 Combustible Dust Producing Operations CFC 105 Permit 79.00 7/1/2021 7.90 87.00 Combustible Fiber Storage CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Combustible Materials Storage CFC 105 Permit 63.00 7/1/2021 6.30 70.00 Compressed Gases CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Cryogens CFC 105 Permit 126.00 7/1/2021 12.60 139.00
Dry Cleaning Plant > or = 2 Units CFC 105 Permit 190.00 7/1/2021 19.00 209.00 Explosives or Blasting agents (se or transportation of) CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Explosives or Blasting agents, use or disposal of CFC 105 Permit 297.00 7/1/2021 29.70 327.00 Fireworks, Manufacture, Compound, Storage CFC 105 Permit 253.00 7/1/2021 25.30 278.00 Flammable/Combustible Liquids Inside < 60 gallons CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Flammable/Combustible Liquids Inside > or = 60 gallons CFC 105 Permit 63.00 7/1/2021 6.30 70.00 Flammable/Combustible Liquids Outside Above Ground Tank Per tank/105 Permit 94.00 7/1/2021 9.40 103.00 Flammable/Combustible Liquids Outside Underground Tank Per tank/105 Permit 94.00 7/1/2021 9.40 103.00 Fuel Dispensing CFC 105 Permit 79.00 7/1/2021 7.90 87.00 20

Page 314 of 329 ends

CITY OF NORCO
FIRE PREVENTION SERVICES FEE SCHEDULE Fees last 10% CPI Proposed Service Name Fee Description 2022-23 Fee increased increase 2022-23 Fee Hazardous Materials CFC 105 Permit 126.00 7/1/2021 12.60 139.00 High Piled Combustible Storage CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Liquefied Petroleum Gases (LPG), Storage, Use and Dispensing CFC 105 Permit 32.00 7/1/2021 3.20 35.00 Liquid or gas fueled vehicles or equipment in an Assembly area CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Lumber Yard/Woodworking Plants CFC 105 Permit 168.00 7/1/2021 16.80 185.00 Magnesium operation CFC 105 Permit 63.00 7/1/2021 6.30 69.00 Malls: Covered and Uncovered CFC 105 Permit 185.00 7/1/2021 18.50 203.00 Miscellaneous Combustible Storage CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Motor Vehicle Repair CFC 105 Permit 79.00 7/1/2021 7.90 87.00 Ovens - Industrial baking or drying, furnace or kiln special equip. CFC 105 Permit 79.00 7/1/2021 7.90 87.00 Places Of Assembly (Occupancy Load > 49 persons) CFC 105 Permit 56.00 7/1/2021 5.60 62.00 Pyrotechnic special effects material/model rockets CFC 105 Permit 297.00 7/1/2021 29.70 327.00 Refrigeration Equipment < 500 lbs. CFC 105 Permit 126.00 7/1/2021 12.60 139.00 Refrigeration Equipment > or = 500 lbs. CFC 105 Permit 253.00 7/1/2021 25.30 278.00 Special Amusement Buildings CFC 105 Permit 190.00 7/1/2021 19.00 209.00 Spraying (Booth) or Dipping Operations CFC 105 Permit 56.00 7/1/2021 5.60 62.00 Tire Storage CFC 105 Permit 79.00 7/1/2021 7.90 87.00
Welding and Cutting Operation CFC 105 Permit 63.00 7/1/2021 6.30 69.00 Wood Products Storage CFC 105 Permit 79.00 7/1/2021 7.90 87.00 21

Page 315 of 329 ends

Fiscal & Support Services 2022-23 Fee Fees last increased 10% CPI
Increase
Proposed
2022-23 Fee
Collection Fee Actual Cost n/a Actual Cost
Late Payment Penalty for Administrative and Parking Citations 32.00 n/a 32.00 Live Scan – Fee plus Applicable DOJ and FBI Charges 37.00 7/21/2021 3.70 41.00 Reproduction (up to 11" x 17") - Black/White 0.25 n/a 0.25 Reproduction (up to 11" x 17") - Color 0.50 n/a 0.50
Reproduction (larger than 11" x 17") - Black/White or Color 10.00 n/a 10.00 Returned Check Fee 48.00 n/a 48.00
Yard Sale Permit (for three days only, once every three months) 9.00 0.90 10.00 Fine for Unauthorized Yard Sale 113.00 - 284.00 7/1/2021 11.30 - 28.40 124.00-312.00 22

Page 316 of 329 ends

FISCAL & SUPPORT SERVICES
Business License Fees 2022-23 Fee
Fees last
increased

7.5% CPI
Increase
Proposed
2022-23 Fee
Business License Processing Fees
Agriculture/Farm 58.00 7/1/2021 4.35 62.00
Animal Keeping 58.00 7/1/2021 4.35 62.00
Bingo 27.00 7/1/2021 2.03 29.00
Commercial 153.00 7/1/2021 11.48 164.00
Farmer's Market (Indoor) 153.00 7/1/2021 11.48 164.00
Farmer's Market (Outdoor) 27.00 7/1/2021 2.03 29.00
Home Occupation 58.00 7/1/2021 4.35 62.00
Massage Business Establishment 164.00 7/1/2021 12.30 176.00 Plus Commercial Processing Fee 153.00 7/1/2021 11.48 164.00 Massage Technician 126.00 7/1/2021 9.45 135.00
Not-for-Profit/Exempt Business 27.00 7/1/2021 2.03 29.00 Not-for-Profit/Exempt Business (Fixed Location In Town) 153.00 7/1/2021 11.48 164.00 Out of Town Business 27.00 7/1/2021 2.03 29.00
Out of Town Contractor (A/B or C/D) 27.00 7/1/2021 2.03 29.00 Out of Town Delivery Vehicle 27.00 7/1/2021 2.03 29.00
Out of Town Real Estate 27.00 7/1/2021 2.03 29.00
Permanent Swap Meet Operator 42.00 per bus. 7/1/2021 3.15 45.00 per bus.

Rental Property 27.00 7/1/2021 2.03 29.00
Sidewalk Vendor 58.02 7/1/2021 4.35 62.00
Solicitor 27.00 7/1/2021 2.03 29.00
Space Rental 27.00 7/1/2021 2.03 29.00
Special Event Vendor 15.00 7/1/2021 1.13 16.00
Business License Renewal 20.00 7/1/2021 1.50 22.00
Moved/Changed License 27.00 7/1/2021 2.03 29.00
23

Page 317 of 329 ends

FISCAL & SUPPORT SERVICES
Business License Fees 2022-23 Fee
Fees last
increased

7.5% CPI
Increase
Proposed
2022-23 Fee
Business License Tax
Business License Tax - Set by Statute varies 7/1/2021 varies varies Business License Tax - Not-for-Profit/Exempt Organization - n/a - SB 1186 (per application) 4.00 7/1/2021 0.30 4.00
Business License Fire Operation Permit Fees ** 10% CPI
Increase
Proposed
2022-23 Fee
Annual Fire Inspection Fees
Small Businesses – 1 – 4,999 Sq. Ft. 76.00 7/1/2021 7.60 84.00 Medium Businesses – 5,000 – 9,999 Sq. Ft. 151.00 7/1/2021 15.10 166.00 Large Businesses – > 10,000 Sq. Ft. 379.00 7/1/2021 37.90 417.00 Public Assembly (50 to 99 occupancy) 227.00 7/1/2021 22.70 250.00 Public Assembly (100 and greater occupancy) 417.00 7/1/2021 41.70 459.00 ** See Fire Operation Permit Fees
24

Page 318 of 329 ends

WATER UTILITY FEES 2022-23 Fee Fees last increased

7.5% % CPI
increase
Proposed
2022-23 Fee
Check Read Charge 79.00 7/1/2021 5.93 85.00
Construction Meter Relocation 180.00 7/1/2021 13.50 194.00 Broken/Damaged Lock Fee 29.00 7/1/2021 2.18 31.00
Deposit – Clean and Show 207.00 7/1/2021 No Change 207.00 Deposit – Residential, Landscape, Fireline 200 (min) 7/1/2021 No Change 200 (min) Deposit – Commercial, Industrial, Multi-Family 300 (min) 7/1/2021 No Change 300 (min) Deposit – Meter Test (2” or smaller)
At staff/3rd party
vendor cost 7/1/2021 No Change
At staff/3rd party
vendor cost
Deposit – Meter Test (3” or larger)
At staff/3rd party
vendor cost 7/1/2021 No Change
At staff/3rd party
vendor cost
Deposit – Temporary Construction Meter 1,647.00 7/1/2021 123.53 1,771.00 Fire Flow Test Fee 450.00 7/1/2021 33.75 484.00
Jumper Fee 153.00 7/1/2021 11.48 164.00
Late Charge
10% of Outstanding
Amount 7/1/2021 No Change
10% of Outstanding
Amount
Service Turn-On/Reconnection Fee (prior to 3:30 pm) 63.00 7/1/2021 4.73 68.00 Service Turn-On/Reconnection Fee (after 3:30 pm) 233.00 7/1/2021 17.48 250.00 Service Turn-On/Reconnection Fee - SB998 (prior to 3:30 pm) 52.00 7/1/2021 3.90 56.00 Service Turn-On/Reconnection Fee - SB998 (after 3:30 pm) 155.00 7/1/2021 11.63 167.00 Service Turn-Off/Disconnection Fee 100.00 7/1/2021 7.50 107.00 Pulled Meter Fee 153.00 7/1/2021 11.48 164.00
New Service Fee 45.00 7/1/2021 3.38 48.00
Temporary Service Permit - Metered 184.00 7/1/2021 13.80 198.00 Temporary Service Permit - Unmetered 170.00 7/1/2021 12.75 183.00 Temporary Service – Monthly Service Charge
Current 3" Water
Service Charge 7/1/2021 No Change
Current 3" Water
Service Charge
Voluntary Emergency Medical Services Subscription Program (Residential Monthly Subscriber) 4.00 No Change 4.00
25

Page 319 of 329 ends

Planning Division 2022-23 Fee Fees last increased
10% CPI
Increase
Proposed
2022-23 Fee
ABC Letter of Necessity 238.00 7/1/2021 23.80 261.00
Additional Animal Units per Section 18.35.06 or 18.13.08 (Fee + Public Noticing Fee + Animal Control Costs) 83.00 7/1/2021 8.30 91.00
Renew Animal Unit 200.00 7/1/2021 20.00 89,426.00
Architectural & Photometric Review 571.00 7/1/2021 57.10 628.00 Accessory Building Use Permit 3,598.00 7/1/2021 359.80 3,958.00 Developer or Major Permit Appeal to Planning Commission 1,966.00 7/1/2021 196.60 2,163.00 Resident or Minor Appeal to Planning Commission* 195.00 7/1/2021 19.50 215.00 Developer or Major Appeal to City Council* 1,536.00 7/1/2021 153.60 1,690.00 Resident or Minor Appeal to City Council* 598.00 7/1/2021 59.80 658.00 * Appeal fee will be refunded if the decision is reversed on appeal Categorical Exemption (per application) 148.00 7/1/2021 14.80 163.00 Commercial Vehicle Exemption Permit 270.00 7/1/2021 27.00 904.00 Commercial Vehicle Exemption Permit-Renewal 79.00 7/1/2021 7.90 87.00 Continuance (Fee plus postage and publishing costs) 1,383.00 7/1/2021 138.30 1,521.00 Conditional Use Permit – Annual Inspection – Sale of Alcohol 132.00 7/1/2021 13.20 145.00 Conditional Use Permit – Annual Inspection – All Others 132.00 7/1/2021 13.20 145.00 Conditional Use Permit – Miniaturized Pigs in R-1-10 Zone 434.00 7/1/2021 43.40 477.00 Conditional Use Permit – Miniaturized Pigs in R-1-10 Zone (Renewal) 79.00 7/1/2021 7.90 87.00 Conditional Use Permit – Minor, plus animal-control costs (Resident) (except Additional Animal Units, refer to that fee) 1,971.00 7/1/2021 197.10 2,168.00 Conditional Use Permit – Minor, plus animal-control costs (Developer) 4,371.00 7/1/2021 437.10 4,804.00 Conditional Use Permit – Major 8,308.00 7/1/2021 830.80 9,139.00 Conditional Use Permit Modification – Minor 4,254.00 7/1/2021 425.40 4,679.00 Conditional Use Permit Modification – Major 4,254.00 7/1/2021 425.40 4,679.00 Conditional Use Permit – Annual Inspection 57.00 7/1/2021 5.70 63.00 C.C. & R. Review Fee + 4 hours attorney fees 2,008.00 + Atty fees 7/1/2021 200.80 2209.00 + Atty fees Development Phasing Plan 1,049.00 7/1/2021 104.90 1,154.00 Entertainment Permit 2,453.00 7/1/2021 245.30 2,698.00
Fence/Wall Review (Subdivision) 508.00 7/1/2021 50.80 559.00 Filming 1-4 Days (exclusive of all Public Safety, Public Works and Legal Expenses, charged at fully burdened hourly rate) 511.00 7/1/2021 51.10 562.00 Filming > 4 Days (exclusive of all Public Safety, Public Works and Legal Expenses, charged at fully burdened hourly rate) 634.00 7/1/2021 63.40 697.00 General Plan Amendment; Zone Change (per application) 9,225.00 7/1/2021 922.50 10,148.00 Initial Environmental Assessment (plus outside cost and fully burdened rate after 12 hours of staff time) 2,570.00 7/1/2021 257.00 52,960.25
Informal Review by Planning Commission (with pre-application) 1,743.00 7/1/2021 174.30 8,582.00 Informal Review by Planning Commission (no pre-application) 1,743.00 7/1/2021 174.30 1,917.00 Landscape Plan Checks Review - Three Reviews & One Field Review 757.00 7/1/2021 75.70 833.00 Additional Landscape Plan Check Review 132.00 7/1/2021 13.20 145.00 Additional Landscape Plan Check Inspection 158.00 7/1/2021 15.80 174.00 Large Family Day Care 2,347.00 7/1/2021 234.70 2,582.00 Major Environmental Assessment (up to 200 hours) 39,669.00 7/1/2021 3,966.90 43,646.00 Major Environmental Assessment (> 200 hours) Cost of Service 7/1/2021 n/a Cost of Service 26

Page 320 of 329 ends

Planning Division 2022-23 Fee Fees last increased
10% CPI
Increase
Proposed
2022-23 Fee
Charge fully burdened hourly rate & out of pocket costs against deposit Mitigated Negative Declaration (up to 5 hours) 1,170.00 7/1/2021 117.00 3,919.00 Mitigated Negative Declaration (> 5 hours) Cost of Service 7/1/2021 n/a Cost of Service Charge fully burdened hourly rate & out of pocket costs against deposit Mitigation Plan One Time Monitoring (up to 5 hours) 1,170.00 7/1/2021 117.00 3,913.00 Mitigation Plan One Time Monitoring (> 5 hours) Cost of Service 7/1/2021 n/a Cost of Service Charge fully burdened hourly rate & out of pocket costs against deposit Model Home Complex Review 2,786.00 7/1/2021 278.60 3,065.00 Planning Commission Review for Consistency 1/2 base application 7/1/2021 n/a 1/2 base application Planning Information Letter 428.00 7/1/2021 42.80 471.00 Pre-Application Review - First Review n/a 7/1/2021 n/a n/a Pre-Application Subsequent Reviews 1,992.00 7/1/2021 199.20 2,191.00 Project/Environmental Review Fee (by outside consultant selected by City) Cost + 30% 7/1/2021 n/a Cost + 30% Public Notice Fee 550.00 7/1/2021 55.00 1,842.00
Reproduction (up to 11" x 17") - Black/White 0.25 n/a 0.25 Reproduction (up to 11" x 17") - Color 0.50 n/a 0.50
Reproduction (larger than 11" x 17") - Black/White or Color 10.00 n/a 10.00 Sign Review - Monument & Pole Signs 811.00 7/1/2021 81.10 892.00 Sign Review - Wall Signs 508.00 7/1/2021 50.80 559.00
Sign Review - Temporary Special Event Signs 79.00 7/1/2021 7.90 87.00 Single Event 79.00 7/1/2021 7.90 87.00
3 Events Per Application 79.00 7/1/2021 7.90 87.00
6 Month Renewal 79.00 7/1/2021 7.90 87.00
Sign Review, Freeway - Oriented 4,133.00 7/1/2021 413.30 4,546.00 Sign Program Review 2,061.00 7/1/2021 206.10 2,267.00
Similar Use Finding - Planning Commission 8,213.00 7/1/2021 821.30 9,034.00 Site Plan Review - Minor 4,181.00 7/1/2021 418.10 4,599.00 Site Plan Review - Major 7,604.00 7/1/2021 760.40 8,364.00 Site Plan Review Modification 4,768.00 7/1/2021 476.80 5,245.00 Special Events - Sidewalk Sales 79.00 7/1/2021 7.90 87.00 Special Events - Non Profit Organizations n/a n/a n/a
Event on Private Property n/a n/a n/a
Requires Closure of Public Right-Of-Way at the End of Dead-End Public Trails, Sidewalks or Streets 79.00 7/1/2021 7.90 87.00
Requires the Closure of Public Right-Of-Way on or Through Public Trails, Sidewalks or Streets that Require a Traffic Plan/Detours 347.00 7/1/2021 34.70 382.00 Special Events - All Others 192.00 7/1/2021 19.20 211.00 Alcohol Review 763.00 7/1/2021 76.30 839.00
Block Party 556.00 7/1/2021 55.60 612.00
Temporary construction trailer or storage container 158.00 7/1/2021 15.80 174.00 Seasonal Sales/Opening 122.00 7/1/2021 12.20 134.00
Event on Private Property 105.00 7/1/2021 10.50 116.00
27

Page 321 of 329 ends

Planning Division 2022-23 Fee Fees last increased
10% CPI
Increase
Proposed
2022-23 Fee
Requires Closure of Public Right-Of-Way at the End of Dead-End Public Trails, Sidewalks or Streets 911.00 7/1/2021 91.10 1,002.00
Requires the Closure of Public Right-Of-Way on or Through Public Trails, Sidewalks or Streets that Require a Traffic Plan/Detours All related fees 7/1/2021 All related fees All related fees Note: All Special Event applications would also include the cost of any street closure, traffic control, On-site patrol, additional fire protection standby, etc. n/a n/a n/a Specific Plan Preparation (up to 200 hours) 36,781.00 7/1/2021 3,678.10 40,459.00 Specific Plan Preparation (> 200 hours) Cost of Service 7/1/2021 Cost of Service Cost of service Specific Plan Amendment (up to 200 hours) 33,108.00 7/1/2021 3,310.80 36,419.00 Specific Plan Amendment (> 200 hours) Cost of Service 7/1/2021 Cost of Service Cost of Service Charge fully burdened staff rate and consultant costs against deposit Swap Meet/Open Air Market-Temporary Permit - Per Day 42.00 7/1/2021 4.20 46.00 Swap Meet/Open Air Market-Permanent Permit 7,111.00 7/1/2021 711.10 7,822.00 Swap Meet Processing Fee/State Fee 32.00/1.00 7/1/2021 3.20 35.00/1.00 Tentative Parcel Map - Single Family Residential (three plan checks included) 8,335.00 7/1/2021 833.50 9,169.00 Tentative Parcel Map - Commercial (three plan checks included)* 8,335.00 7/1/2021 833.50 9,169.00 * (fee plus $200.00/lot)
Tentative Parcel Map (additional plan checks per sheet) 407.00 7/1/2021 40.70 448.00 Tentative Parcel Map Modification 5,426.00 7/1/2021 542.60 5,969.00 Tentative Parcel Map Extension of Time (Planning Commission and City Council) 990.00 7/1/2021 99.00 3,316.00 Tentative Tract Map (first three plan checks are included) * 18,012.00 7/1/2021 1,801.20 19,813.00 * (fee plus $260/lot over 5)
Tentative Tract Map (additional plan check fees per sheet) 678.00 7/1/2021 67.80 746.00 Tentative Tract Map Modification 5,918.00 7/1/2021 591.80 6,510.00 Variance - Commercial and Modifications to Variance Commercial 3,247.00 7/1/2021 324.70 3,572.00 Variance - Residential and Modification to Variance Residential 2,734.00 7/1/2021 273.40 3,007.00 Zone Change **See General Plan Amendment
Zone Code Amendment/Code Change Application 3,817.00 7/1/2021 381.70 4,199.00 Zone Verification Letter 158.00 7/1/2021 15.80 174.00
Zoning and General Plan Map Copies (11” X 17” folded) 5.00 n/a 15.00 Zoning and General Plan Map Copies (wall map) 10.00 n/a 30.00 28

Page 322 of 329 ends

PUBLIC WORKS DEPARTMENT 2022-23 Fee
Fees last
increased
10% CPI
Increase
Proposed
2022-23 Fee
Blasting Permit - Initial Fee 704.00 7/1/2021 70.40 774.00 Blasting Permit - Each Additional Blast 307.00 7/1/2021 30.70 338.00 Encroachment - Single Domestic Water Service (line only) 1" & 2" 900.00 7/1/2021 90.00 91,770.50 Encroachment - Commercial/SFR Utility Lateral (sewer & water 3" & above) 900.00 7/1/2021 90.00 91,770.50 Encroachment - SFR Driveway Approach 572.00 7/1/2021 57.20 629.00 Encroachment - SFR Driveway Pavers (non-trail side) 652.00 7/1/2021 65.20 717.00 Encroachment - SFR w/o Trail Pavers 572.00 7/1/2021 57.20 629.00 Encroachment - SFR Curb Core 487.00 7/1/2021 48.70 536.00 Encroachment - Commercial Driveway 652.00 7/1/2021 65.20 717.00 Encroachment - Commercial Trail Pavers 652.00 7/1/2021 65.20 717.00 Encroachment - Sign in Right of Way 408.00 7/1/2021 40.80 449.00 Encroachment - Utility Street Cut - 4.5% of cost estimate, minimum of $572 572.00 7/1/2021 57.20 629.00 Final Map Check (fee plus $600/lot) - Includes first three plan checks 4,546.00 7/1/2021 454.60 5,001.00 Final Map Check (after 3 checks) Fully Burdened 7/1/2021 n/a Fully Burdened Charge Fully Burdened Staff Rate against an initial deposit 7/1/2021 Grading and Posting Plan Review – Residential 710.00 7/1/2021 71.00 2,378.00 Grading and Posting Plan Review – Commercia l -Charge UBC 2,448.00 7/1/2021 244.80 2,693.00 $2,448 for the first 3 plan checks and $310 for additional plan checks or fully burdened hourly rate with a $2,448 minimum 7/1/2021
Grading Permit/Inspection – Residential 1,245.00 7/1/2021 124.50 1,370.00 Grading Permit/Inspection – Other – Charge UBC 1,717.00 7/1/2021 171.70 1,889.00 Inspection Fee 14.04.150(B) 150 per hr. 7/1/2021 n/a 150 per hr.

Lot Line Adjustment (includes 3 plan checks, additional checks at fully burdened staff rate) 1,627.00 7/1/2021 162.70 1,790.00 Lot Merger (Includes 3 plan checks, additional checks at fully burdened staff rate) 1,516.00 7/1/2021 151.60 1,668.00 New Meter Purchase Cost + 20% 7/1/2021 n/a Cost + 20%
Overload Moving Permit – One Day 17.00 7/1/2021 1.70 19.00 Overload Moving Permit – Annual Permit 95.00 7/1/2021 9.50 105.00 PAKA Relocation 1,568.00 7/1/2021 156.80 1,725.00
Reproduction (up to 11" x 17") - Black/White 0.25 7/1/2021 n/a 0.25 Reproduction (up to 11" x 17") - Color 0.50 7/1/2021 n/a 0.50 Reproduction (Larger than 11” x 17” sheet) Black/White or Color 10.00 7/1/2021 n/a 10.00 Technical Report Review – Charge full cost against a deposit with a minimum of 1,060.00 7/1/2021 106.00 3,550.00 Hydrology Review (includes 3 reviews) 4,859.00 7/1/2021 485.90 5,345.00 WQMP Review (includes 3 reviews) 4,859.00 7/1/2021 485.90 5,345.00 29

Page 323 of 329 ends

PUBLIC WORKS DEPARTMENT 2022-23 Fee
Fees last
increased
10% CPI
Increase
Proposed
2022-23 Fee
Public Improvement/Plan Check Inspection Fees – charge according to valuation table shown in Exhibit “B” See Exhibit "B" 7/1/2021 n/a See Exhibit "B" Re-Inspection Fee 65.00 7/1/2021 6.50 72.00
Plan Check Fee 14.04.150(B) 150 per hr. 7/1/2021 n/a 150 per hr.

Temporary Service – Monthly Service Charge 14.04.130
Current 3" Water
Service Charge 7/1/2021 n/a
Current 3" Water Service
Charge
Utility Pole Installation or Replacement 182.00 + 155.00 per site 7/1/2021 18.20 200.00 + 155.00 per site Wireless Communications - Small Cell Facility Permit (in public right-of-way) 128.00 + 365.00 per site 7/1/2021 12.80 141.00 + 365.00 per site Wireless Communications - Modification of Existing Telecommunication Facility 64.00 + 185.00 per site 7/1/2021 6.40 70.00 + 185.00 per site 30

Page 324 of 329 ends

2022-23 Fee
Fees last
increased
10 % CPI
Increase
Proposed
2022-23 Fee
Valuation Current Fee

PUBLIC IMPROVEMENT PLAN CHECK FEE
$0 - $10,000 $834.00 834.00 7/1/2021 83.40 917.00
$10,001 - $100,000 $834 + 3.2% OF VALUATION > $10,000 834.00 + 3.2% 7/1/2021 83.40 917.00 + 3.2% $100,001 - $1,000,000 $3,818 + 1.3% OF VALUATION > $100,000 3,818.00 + 1.3% 7/1/2021 381.80 4200.00 + 1.3% >$1,000,000 $15,939 + 0.9% OF VALUATION > $1,000,000 15,939.00 + 0.9% 7/1/2021 1,593.90 17532.00 + 0.9%

PUBLIC IMPROVEMENT INSPECTION FEE
$0 - $10,000 $606.00 606.00 7/1/2021 60.60 667.00
$10,001 - $100,000 $606 + 3.6% OF VALUATION > $10,000 606.00 + 3.6% 7/1/2021 60.60 667.00 + 3.6% $100,001 - $1,000,000 $3,963 + 1.15% OF VALUATION > $100,000 3,963.00 + 1.15% 7/1/2021 396.30 4359.00 + 1.15% >$1,000,000 $14,685 + 0.55% OF VALUATION > $1,000,000 14,685.00 + 0.55% 7/1/2021 1,468.50 16154.00 + 0.55%

PUBLIC WORKS DEPARTMENT
Exhibit "B"
31

Page 325 of 329 ends

2022-23 Fee

7.5 % CPI
Increase
Proposed
2022-23 Fee

15.00 n/a 15.00
Background Investigation & Report (per application + outside fees) 246.00 7/1/2021 18.45 264.00 DUI Emergency Response Recovery charge up to statutory limit Cost of Service n/a at the County and City approved rate for staff and equipment Jail Access Booking Fee (set by County Study & Resolution) 514.58 n/a
One Day ABC License (may be waived for non-profits) 47.00 7/2/2021 3.53 51.00 Reproduction (up to 11" x 17") - Black/White 0.25 n/a 0.25

0.50 n/a 0.50

10.00 n/a 10.00
190.00 7/1/2021 14.25 204.00

94.00 7/2/2021 7.05 101.00
Fines Related to Parking Violations
Municipal Code Section Violation

10.08 et al All violations not enumerated 36.00 7/1/2019 n/a 36.00

10.08.030A Parking in equestrian trail 155.00 7/1/2019 n/a 155.00

10.08.030B Obstruct traffic or hazard 36.00 7/1/2019 n/a 36.00

10.08.030C Obstruct private driveway 36.00 7/1/2019 n/a 36.00

10.08.030D Obstruct fire equipment to hydrant 139.00 7/1/2019 n/a 139.00

10.08.030E Posted no parking or permit only 36.00 7/1/2019 n/a 36.00

10.16.060 Commercial vehicle prohibition 259.00 7/1/2019 n/a 259.00

10.16.070 Unattached trailer prohibition 36.00 7/1/2019 n/a 36.00 Any other M.C. section Any parking violation not otherwise listed 36.00 7/1/2019 n/a 36.00 Vehicle Code Section Violation 7/1/2019
4000(a)(1) Unregistered Vehicle 81.00 7/1/2019 n/a 81.00 21113(a) Permit required - Public Grounds 36.00 7/1/2019 n/a 36.00 22500(a) Improper parking - Intersection 57.00 7/1/2019 n/a 57.00 22500(b) Improper parking - Crosswalk 57.00 7/1/2019 n/a 57.00 22500(c) Improper parking - Safety Zone 62.00 7/1/2019 n/a 62.00 22500(d) Improper parking - Fire Station 57.00 7/1/2019 n/a 57.00 22500(e) Improper parking - Driveway 36.00 7/1/2019 n/a 36.00 22500(f) Improper parking - Sidewalk 36.00 7/1/2019 n/a 36.00 22500(g) Improper parking - Obstruct Traffic 36.00 7/1/2019 n/a 36.00 22500(h) Improper parking - Double Park 36.00 7/1/2019 n/a 36.00 Vehicle Impound Cost Recovery
Vehicle (VIN) Verification Service

SHERIFF'S DEPARTMENT
Citation Correction Certification
*County’s cost charged to City not to exceed $514.58
Reproduction (up to 11" x 17") - Color
Reproduction (larger than 11" x 17") - Black/White or Color 32

Page 326 of 329 ends

2022-23 Fee

7.5 % CPI
Increase
Proposed
SHERIFF'S DEPARTMENT 2022-23 Fee
Citation Correction Certification 22500(i) Improper parking - Bus zones 295.00 7/1/2019 n/a 295.00 22500(j) Improper parking - Tunnel 36.00 7/1/2019 n/a 36.00 22500(k) Improper parking - Bridge 41.00 7/1/2019 n/a 41.00 22500(l) Parking in wheelchair access 419.00 7/1/2019 n/a 419.00 22500.10 Parking in fire lane 368.00 7/1/2019 n/a 368.00 22507.8(a)(b)(c) Designated parking - Disabled 419.00 7/1/2019 n/a 419.00 22514.00 Parking - Fire Hydrant 135.00 7/1/2019 n/a 135.00 Any other V.C. Section Any parking violation not otherwise listed 36.00 7/1/2019 n/a 36.00 22502(a) Improper parking - 18” from curb 36.00 7/1/2019 n/a 36.00 5200(a) Improper/Fail to display license plate 81.00 7/1/2019 n/a 81.00 5204(a) Registration tabs properly affixed 81.00 7/1/2019 n/a 81.00 33

Page 327 of 329 ends

RESOLUTION NO. 2022-86

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA, TO UPDATE AND ADJUST THE CITY’S GENERAL FEE SCHEDULE FOR FISCAL YEAR (FY) 2022-2023
WHEREAS, pursuant to Government Code Section 66016 the specific fees to be charged for services must be adopted by the City Council by Resolution after providing notice (Agenda) and holding a public meeting; and
WHEREAS, a notice of public meeting has been provided in accordance with Government Code Section 66016, oral and written presentations were made and received, and the required public notice was given; and WHEREAS, the City Council has determined that in order to continue providing effective services for the public welfare, it is necessary to adopt a revised General Fee Schedule which sets forth fees for City Services; and
WHEREAS, a schedule of fees and charges to be paid by those requesting such special services needs to be adopted so that the City might carry into effect its policies; and
WHEREAS, it is the intention of the City Council to adopt an amendment to the General Fee Schedule, and charges based on changes to the Consumer Price Index from March 2021 to March 2022 so that certain proposed fees for FY 2022-2023 have been increased by recommended percentages, or by this amount rounded; and WHEREAS, the General Fee Schedule will include all fees associated with ‘Fee Resolution’ in the City of Norco Municipal Code; and
WHEREAS, all requirements of California Government Code Section 66016 are hereby found to have been complied with.

NOW, THEREFORE, the City Council of the City of Norco, California, hereby resolves as follows:

SECTION 1. Resolution No. 2021-28 is hereby repealed.

SECTION 2. The General Fee/Fine Schedule is hereby amended as listed in the attachment of this Resolution.

SECTION 3. FINDINGS: The City council finds that the fees and charges set forth in the Miscellaneous Fee Schedule have a reasonable relationship with the City’s costs in providing and maintaining those services and facilities; and are necessary to enable the City to continue providing and maintaining the services and facilities to which they relate.

SECTION 4. The fees set forth in this Resolution shall become effective upon adoption but may be implemented on February 1, 2023, with development fees implemented on February 21, 2023.

Page 328 of 329 ends

Resolution No. 2022-86 - Update and Adjust FY 2022-2023 Fee Schedule

Page 2 ends

December 21, 2022
PASSED AND ADOPTED by the City Council of the City of Norco, California, at its regular meeting held on December 21, 2022.
___________________________
Robin Grundmeyer, Mayor
City of Norco, California
ATTEST:
___________________
Dana Roa, CMC, City Clerk
City of Norco, California
I, Dana Roa, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was introduced and adopted by the City Council of the City of Norco, California, at a meeting held on December 21, 2022 by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California on December 21, 2022.
____________________
Dana Roa, CMC, City Clerk
City of Norco, California
Attachment: Fiscal Year 2022-2023 General Fee/Fine Schedule

Page 329 of 329 ends
← All documents from this meeting