Cities Index.
Agenda, closed session

Norco City Council
January 15, 2025

Document
Agenda, closed session
Meeting
January 15, 2025
Body
Norco City Council
Pages
624
Original file
206.2 MB
Text extracted from the city's file for reading and search. Open the original on norco.civicweb.net. That file is the official record.

AGENDA
City Council
Wednesday, January 15, 2025
City Council Meeting
Planning Commission Joint Workshop
City Council Chamber – Norco City Hall
2820 Clark Avenue, Norco, CA 92860
CALL TO ORDER 5:00 PM
CITY COUNCIL ROLL CALL Greg Newton, Mayor
Robin Grundmeyer, Mayor Pro Tem
Kevin Bash, Council Member
Gregory Bowen, Council Member
Fia Sullivan, Council Member
PLANNING COMMISSION ROLL CALL Danny Azevedo, Vice Chair Patricia Hedges, Member
Jeff Shyu, Member
Tara Young, Member

JOINT WORKSHOP - NEW LAWS

CLOSED SESSION
CONFERENCE WITH LEGAL COUNSEL—EXISTING LITIGATION
Paragraph (1) of subdivision (d) of Section 54956.9
Name of case: FPPC v. City of Norco

CONFERENCE WITH LABOR NEGOTIATORS
Agency designated representatives: Mayor and Mayor Pro Tempore Unrepresented employee: City Manager
CONFERENCE WITH LEGAL COUNSEL—ANTICIPATED LITIGATION
Significant exposure to litigation pursuant to paragraph (2) of subdivision (d) of Section 54956.9: (1 potential case) a property owner requesting a sound wall alleged via email City's actions violate federal guidelines and civil rights and also references damages.

RECONVENE PUBLIC SESSION 7:00 PM

REPORT OF ACTION(S) TAKEN IN CLOSED SESSION
PLEDGE OF ALLEGIANCE Council Member Bash
INVOCATION Chaplain Bruce Smith
Cowboys for Christ
City Council Agenda - January 15, 2025
PRESENTATIONS Parks and Recreation Needs
Assessment Status Update

1. CITY COUNCIL REPORTS ON REGIONAL BOARDS

2. PUBLIC COMMENTS
This is the time when persons wishing to address the presiding governmental body regarding the Consent Calendar, Legislative Matters or items within the subject matter jurisdiction of the legislative body. Please submit a speaker card to the Meeting Clerk. Please limit comments to three minutes or less. The Ralph M. Brown Act limits the governmental body’s ability to respond to comments on non-agendized matters at the time such comments are made. The governmental body shall not discuss or act relative to any general public comment.

3. CONSENT CALENDAR
All items listed under the Consent Calendar are considered to be routine and may be enacted by one motion. Prior to the motion to consider any action by the presiding governmental body, any public comments on any of the Consent Items will be heard. There will be no separate action unless members of the governmental body request specific items be removed from the Consent Calendar. Items removed from the Consent Calendar will be separately considered under Item 4 of the Agenda.

3.A. Waive Reading of all Ordinance Adoptions on this Agenda and Read by Title Only
RECOMMENDATION:

Waive reading, by title only, of all Ordinances and Resolutions. Said Ordinances and Resolutions which appear on the agenda shall be determined to have been read by title and further reading waived.

Staff Report - Pdf

3.B. Approval of City Council Regular Meeting Minutes
RECOMMENDATION:

Approve the City Council Regular Meeting Minutes of December 18, 2024.

Staff Report - Pdf

Page 2 of 624 ends

City Council Agenda - January 15, 2025

3.C. Quitclaim and conveyance of Public Storm Drain Easements located within Tract 25779
RECOMMENDATION:

Approve the quitclaim and convey the offer of dedication of the public storm drain easements within Tract 25779, authorize the City Manager to sign the Quitclaim Deeds and direct the City Clerk to forward the executed Quitclaim Deeds to the Riverside County Flood Control & Water Conservation District (RCFC&WCD) for acceptance and recordation.

Staff Report - Pdf

3.D. Acceptance of Bids and Award of Contract for the Pikes Peak Park ADA Synthetic Poured-In-Place Surfacing Project (Project No. 4407.8) RECOMMENDATION:

Accept bids and award contract to ORTCO, Inc. in the amount of $456,100; and authorize the City Manager to approve contract change orders up to 10% of the original contract.

Staff Report - Pdf

3.E. Accept Proposal and Award Camera System and Wi-Fi Improvements for the Ingalls Event Center Camera System Project (Project No. 54410.10) RECOMMENDATION:

Accept proposal and award contract to SHI International Corporation (through OMNIA Partners Contract No. 2024056) in the amount of $179,000 for the Ingalls Event Center Camera System Project.

Staff Report - Pdf

3.F. Approval for the Installation of a Round Pen at Basin Park (3015 Dapplegray Lane, Norco, CA 92860)
RECOMMENDATION:

Approve the installation of a round pen at Basin Park.

Staff Report - Pdf

3.G. Acceptance of the Citation Drive Storm Drain Project as Complete RECOMMENDATION:

Accept the Citation Drive Storm Drain Project as complete and authorize the City Clerk to file the Notice of Completion with the County of Riverside.

Staff Report - Pdf

Page 3 of 624 ends

City Council Agenda - January 15, 2025

3.H. Appointments to Regional Boards, Standing Committees and Other City Council-Appointed Committees for Calendar Year 2025
RECOMMENDATION:

Approve the City Council appointments to the various standing committees and other governmental agencies for the 2025 calendar year.

Staff Report - Pdf

3.I. Approval of an amendment to the existing contract with Willdan Engineering to include the provision of Code Enforcement services, and an amendment to the FY 2024-25 Contractual Services budget for the Community Development Department - Code Enforcement Division.

RECOMMENDATION:

Approve the requested amendment to the existing contract with Willdan Engineering to add the provision of Code Enforcement services, and appropriate additional funding in the amount of $102,900 for FY 2024-25 - contractual services in the Code Enforcement Division of the Community Development Department.

Staff Report - Pdf

4. ITEM(S) PULLED FROM CONSENT CALENDAR

5. LEGISLATIVE MATTERS
No new evidence will be heard from the public as the public hearing has been closed regarding the items listed. If new substantial amendments are made to the Ordinance at this time, the Ordinance will require a "Third" reading and public comments will be allowed.

5.A. Second Reading: Ordinance No. 1127, Code Amendment 2024-12, An Ordinance of the City of Norco amending Norco Municipal Code Chapter

3.50 to update participation in the Western Riverside County Transportation Uniform Mitigation (TUMF) Program, and Resolution 2024- 56, a resolution to adopt the TUMF schedule.

RECOMMENDATION:

Adopt Second Reading of Ordinance No. 1127, amending and updating the City’s TUMF Ordinance.

Staff Report - Pdf

6. PUBLIC HEARING(S)

Page 4 of 624 ends

City Council Agenda - January 15, 2025
Order of Presentation for Public Hearing Items:

1. Staff Report Presentation

2. Council Questions of Staff

3. Open Public Hearing
a. Public Comment

4. Close Public Hearing

5. Council Discussion and Action

6.A. First Reading: Ordinance, Zone Code Amendment 2024-04 (City of Norco):

A City initiated amendment to Title 18, Chapter 18.43 (Hearings and Appeals Therefrom), Chapter 18.68 (Accessory Building Use Permits), and Chapter 18.40 (Site Plan Review), increasing the public noticing radius requirements from 300 feet with a minimum number of 25 properties captured, to 600 feet with a minimum of 40 properties captured, and to require noticing for Site Plan Review applications.

RECOMMENDATION:

Adopt First Reading: Ordinance No.1128, approving Zone Code Amendment 2024-04.

Staff Report - Pdf

7. CITY COUNCIL / STAFF COMMUNICATIONS

8. ADJOURNMENT
In compliance with the Americans with Disabilities Act, any person who requires a modification or accommodation in order to participate in this meeting is encouraged to contact the City Clerk’s Office at (951) 270-5623 or [email protected] at least 48 hours prior to the meeting so that reasonable arrangements can be made to ensure accessibility. Staff reports are on file in the City Clerk’s Office.

Any writings or documents provided to a majority of the presiding governmental body regarding any item on this agenda will be available for public inspection at the City Clerk’s Office during normal business hours at Norco City Hall, located at 2870 Clark Avenue in Norco. The meeting is recorded.

Page 5 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.A.

To: Honorable Mayor and City Council Members
From: Dana Roa, City Clerk
Prepared By: Sophia Thompson, Deputy City Clerk
Department: City Clerk
SUBJECT:

Waive Reading of all Ordinance Adoptions on this Agenda and Read by Title Only RECOMMENDATION:

Waive reading, by title only, of all Ordinances and Resolutions. Said Ordinances and Resolutions which appear on the agenda shall be determined to have been read by title and further reading waived.

REVIEWED AND APPROVED BY:

Page 6 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.B.

To: Honorable Mayor and City Council Members
From: Dana Roa, City Clerk
Prepared By: Sophia Thompson, Deputy City Clerk
Department: City Clerk
SUBJECT:

Approval of City Council Regular Meeting Minutes
RECOMMENDATION:

Approve the City Council Regular Meeting Minutes of December 18, 2024.

REVIEWED AND APPROVED BY:

Approved by: Lisette Free, Interim City Manager
ATTACHMENT(S):

City Council - Dec 18 2024 - Minutes DRAFT

Page 7 of 624 ends

DRAFT - MINUTES
City Council
Wednesday, December 18, 2024
City Council Chamber – Norco City Hall
2820 Clark Avenue, Norco, CA 92860
CALL TO ORDER 5:00 PM
ROLL CALL Kevin Bash, Mayor
Greg Newton, Mayor Pro Tem
Katherine Aleman, Council Member
Robin Grundmeyer, Council Member
Berwin Hanna, Council Member

DISCUSSION/ACTION ITEMS
A. Certifying the Consolidated General Election held on November 5, 2024 M/S ALEMAN/BASH Adopt Resolution No. 2024-57, reciting the facts of the regular Consolidated General Election held in the City of Norco on Tuesday, November 5, 2024, declaring the results thereof and such other matters as provided by law. The Motion was carried by the following roll call vote:

AYES: BASH, NEWTON, ALEMAN, GRUNDMEYER, AND HANNA
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE

ISSUANCE OF OATH OF OFFICE
Presentation of Certificates of Election and Oath of Office to be administered to newly elected Council Members Robin Grundmeyer, Greg Bowen and Fia Sullivan.

PRESENTATIONS
Presentation to and Comments by Outgoing Council Member Berwin Hanna Jim Pollard presented flowers to Council Member Hanna and thanked him for his time on the City Council and his dedication to the City.

Mayor Bash and Council Members thanked Council Member Hanna for his commitment to the City Council and to the community.

REORGANIZATION OF THE CITY COUNCIL

Page 8 of 624 ends

City Council Minutes - December 18, 2024
A. Election of the Mayor
Elect Council Member Greg Newton as Mayor for the 2025 term.

M/S BASH/BOWEN Elect Council Member Greg Newton as Mayor for the 2025 term.

The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
B. Election of the Mayor Pro Tem
Elect Council Member Robin Grundmeyer as Mayor Pro Tem for the 2025 Term.

M/S NEWTON/BASH Elect Council Member Robin Grundmeyer as Mayor Pro Tem for the 2025 Term. The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
C. Presentation to and Comments by Outgoing Mayor
Outgoing Mayor Bash thanked City Council and staff for their hard work and assistance over the last year. He provided an overview of the City Council's accomplishments and the continued work needed to be done.

CLOSED SESSION
Mayor Newton adjourned to Closed Session at 5:40 PM
City Attorney Burns read the Closed Session items into the record.

CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: (APN 153121011; APN 153020009; APN 153121010; APN 153121008; APN 153121012; APN 153121004; APN 153121003; APN 153121002; APN 153121001)

Page 9 of 624 ends

City Council Minutes - December 18, 2024
Agency negotiator: City Manager, Director of Public Works, City Attorney Negotiating parties: City of Norco and Property Owners
Under negotiation: Price and terms of payment

CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: Silverlakes Sports Park
Agency negotiator: Interim City Manager
Negotiating parties: City of Norco and Balboa Management Group LLC.

Under negotiation: Price and Terms

CONFERENCE WITH LABOR NEGOTIATOR
Agency designated representative: Interim City Manager Lisette Free Employee organization: Utility Workers Union of America, AFL-CIO Local 606

PUBLIC EMPLOYEE APPOINTMENT
Pursuant to Government Code §54957
Title: City Manager
RECONVENE PUBLIC SESSION 7:00 PM

REPORT OF ACTION(S) TAKEN IN CLOSED SESSION
City Attorney Burns reported that for the item, Public Employee Appointment, Interim City Manager Lisette Free was appointed as City Manager. There were no further reportable actions regarding the remaining Closed Session Items.

City Attorney Burns requested that an emergency item from Public Works Director Blais regarding the Hamner Bridge Project be heard under item 5. Discussion/Action Item(s).

Public Works Director Blais provided additional information regarding the urgency of the item.

Motion was made.

M/S NEWTON/BASH to add emergency item for discussion of the Hamner Bridge Project to item 5. Discussion/Action Item(s). The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE

Page 10 of 624 ends

City Council Minutes - December 18, 2024
PLEDGE OF ALLEGIANCE Council Member Grundmeyer
INVOCATION Pastor Jason Davitt
Calvary Chapel Norco
PRESENTATIONS Christmas Performance - Norco High
School Choir
Waste Management Community Award
Organic Waste Diversion Using Chickens

1. CITY COUNCIL REPORTS ON REGIONAL BOARDS
The Mayor, Mayor Pro Tem and Council Members provided reports on their recent individual participation in committees, commissions, regional boards, and community organizations.

2. PUBLIC COMMENTS
Jim Pollard wished everyone a Merry Christmas and thanked staff for all of their hard work on the Christmas Festival and Parade of Lights.

Geoff Kahan congratulated Lisette Free on the appointment of City Manager. He congratulated the new Council Members and Mayor Pro Tem Grundmeyer for her reelection. He thanked Council Member Bash for his term as Mayor and congratulated Mayor Newton. He reminded everyone that on December 28, 2024, it would be the 60th anniversary for the City of Norco and wished everyone a Merry Christmas and Happy New Year.

3. CONSENT CALENDAR
a) Approval of Consent Calendar as Presented
Council Member Bash made a motion to approve the Consent Calendar as presented.

Council Member Bowen requested item 3.M. be pulled for discussion.

Council Member Bash rescinded the original motion and made a new motion.

Page 11 of 624 ends

City Council Minutes - December 18, 2024
M/S BASH/NEWTON Approve the Consent Calendar as presented with item 3.M. pulled for discussion. The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE

3.A. Waive Reading of all Ordinance Adoptions on this Agenda and Read by Title Only
Action: Waived reading, by title only, of all Ordinances and Resolutions. Said Ordinances and Resolutions which appear on the agenda shall be determined to have been read by title and further reading waived.

3.B. Approval of City Council Regular Meeting Minutes
Action: Approved the City Council Regular Meeting Minutes of December 04, 2024.

3.C. Recap of Actions Taken by the Planning Commission at its Meeting Held on December 11, 2024
Action: Received and filed the recap of actions taken by the Planning Commission at its meeting held on December 11, 2024.

3.D. Oversight Board of the Successor Agency to the Norco Community Redevelopment Agency and City of Norco Fiscal Year 2025-26 Recognized Obligation Payment Schedule Including Administrative Budget Action: Adopted Successor Agency Resolution No. 2024-02, approving the Recognized Obligation Payment Schedule including Administrative Budget for the Fiscal Year 2025-

26. 3.E. Accept Proposal and Award Security Improvement Contract for the City Hall Lobby and Security Upgrade Project (Project No. 54303.2 and 4303.1) Action: Accepted proposal and awarded contract to SHI International Corporation (through OMNIA Partners Contract No. 2024056) in the amount of $127,000 for security upgrades for the City Hall Lobby and Security Upgrade Project.

Page 12 of 624 ends

City Council Minutes - December 18, 2024

3.F. Approve Five-Year Licensing Agreement with Lunde Enterprises Action: Approved Five-Year Licensing Agreement with Lunde Enterprises for the use of the Ingalls Event Center for Community Barrel Racing, subject to the terms and conditions outlined in the agreement.

3.G. Approve the Exclusive Promotional Agreement and Non-Exclusive Trademark Partnership License with Horsetown USA® Hall of Fame
Action: Approved the Exclusive Promotional Agreement and Non-Exclusive Trademark Partnership License with Horsetown USA® Hall of Fame, a 501(c)(3) non-profit organization, to establish terms for the promotion of the Horsetown USA® Hall of Fame and the use of City trademarks and assets, as outlined in the agreement.

3.H. Declaration of Assorted Obsolete City Assets as Surplus Property Action: Adopted Resolution No. 2024-58, declaring assorted obsolete City assets as surplus property and authorized the City Manager to dispose them through public auction, scrap or donation.

3.I. City Council Holiday Meeting Schedule
Action: Canceled City Council meeting scheduled for Wednesday, January 1, 2025.

3.J. Increase in Purchase Order for RKA for design services related to Fourth Street Improvement Project (Sierra Ave to Corona Ave)
Action: Reviewed and approved the change order for RKA in the amount of $47,045 for the Fourth Street Improvement Project - Sierra Ave to Corona Ave (Project No. 54900.24) for total contract amount of $167,015 and City Manager authorization for a 10% contingency on design services in case any minor additional design work is required.

3.K. Approve Five-Year Licensing Agreement with Norco Cowgirls Drill Team Action: Approved Five-Year Licensing Agreement between the City of Norco and the Norco Cowgirls Rodeo Drill Team for the use of the Ingalls Event Center, including the Moreno Arena and Clark Arena, for a five-year term, with an option to extend.

Page 13 of 624 ends

City Council Minutes - December 18, 2024

3.L. Acceptance of the Temescal Avenue Street Improvement Project (Sixth St. to Seventh St.) as Complete
Action: Accepted the Temescal Avenue Street Improvement Project (Sixth St. to Seventh St.) as complete and authorized the City Clerk to file the Notice of Completion with the County of Riverside.

3.N. Update Part-Time Employee Salary Schedule to Correspond with State of California Minimum Wage Requirements
Action: Adopted Resolution No. 2024-59, to approve an update to Part-Time Employee Salary Schedule to Correspond with State of California Minimum Wage Requirements.

4. ITEM(S) PULLED FROM CONSENT CALENDAR

3.M. Acceptance of bids and award of Contract for the 2024-25 Trail Fencing Replacement Project (Various Locations).

Council Member Bowen had concerns regarding additional fencing along Sixth Street near the Animal Shelter.

Public Works Director Blais and Facilities and Maintenance Director Hamilton addressed the concerns.

Following discussion, motion was made.

M/S BOWEN/BASH Accept bids and award a contract to Country Estate Fence Co., Inc. for the Fiscal Year 2024-25 Trail Fencing Replacement Project (Various Locations) in the amount of $378,831; and authorize the City Manager to approve contract change orders up to 10 percent of the total bid amount. The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE

5. DISCUSSION / ACTION ITEM(S)
Mayor Newton requested the items be heard in the following order: 5.B., 5.C. and

5.A.

Page 14 of 624 ends

City Council Minutes - December 18, 2024

5.B. Measure R Citizens Oversight Committee Appointment and Youth Commissioner Appointments
City Clerk Roa presented the process for appointing members for the Measure R Citizens' Oversight Committee and Youth Commissioners.

Mayor Newton opened Public Comment.

Mike Williams congratulated the new Council Members and spoke regarding his concern for Youth Commissioners having transportation to and from meetings and a safe space to wait if needed.

The following spoke on their behalf regarding their desire to be appointed as Youth Commissioners: Lauren Woodcock, Sarah Langlois, Isaac Flores, Aileen Quintero, Matthew Mika, Courtney Cieslik, Brooklyn Kerrkilgore, Savannah Shaw-Owens, Kadence Barone and Tegan Jefferson.

Mayor Newton closed Public Comment.

Measure R Citizens' Oversight Committee Appointment:

A random draw was conducted and Heidi Casasola was appointed to the Measure R Citizens' Oversight Committee for the term ending June 2025.

Ballots were completed for the Youth Commissioners with the following votes:

Measure R Citizens' Oversight Committee:

Lauren Woodcock- 3
Brooklyn Kerrkilgore - 1
Sarah Langlois - 1
Lauren Woodcock was appointed as Youth Commissioner for the Measure R Citizens' Oversight Committee for the 2025 term.

Streets, Trails and Utilities Commission:

Brooklyn Kerrkilgore - 1
Lauren Woodcock - 1
Courtney Cieslik - 3
Courtney Cieslik was appointed as Youth Commissioner for the Streets, Trails and Utilities Commission for the 2025 term.

Parks and Recreation Commission:

Page 15 of 624 ends

City Council Minutes - December 18, 2024
Isaac Flores - 1
Tegan Jefferson - 1
Kadence Barone- 2
Aileen Quintero - 1
Additional Ballots were completed until one candidate received 3 votes.

Ballot 2:

Kadence Barone - 2
Brooklyn Kerrkilgore - 1
Isaac Flores - 1
Aileen Quintero - 1
Ballot 3:

Kadence Barone - 4
Aileen Quintero - 1
Kadence Barone was appointed as Youth Commissioner for the Parks and Recreation Commission for the 2025 term.

Planning Commission:

Kadence Barone- 1
Isaac Flores - 1
Lauren Woodcock - 1
Sarah Langlois - 2
Additional Ballots were completed until one candidate received 3 votes.

Ballot 2:

Tegan Jefferson - 1
Isaac Flores - 1
Kadence Barone - 1
Sarah Langlois - 2
Ballot 3:

Sarah Langlois - 5
Sarah Langlois was appointed as Youth Commissioner for the Planning Commission for the 2025 term.

Page 16 of 624 ends

City Council Minutes - December 18, 2024

5.C. Emergency Item to consider approval of funding from Street Fund 149 for augmented street improvements related to the Hamner Bridge Project.

Public Works Director Blais presented information regarding the urgency of the approval for funding.

Public Works Director Blais answered questions and addressed concerns.

Mayor Newton opened Public Comment.

There were no public comments.

Mayor Newton closed Public Comment.

Motion was made.

M/S GRUNDMEYER/SULLIVAN Approve funding from Street Fund 149 for augmented street improvements related to Hamner Bridge. The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE

5.A. A determination by the City Council on the development type that triggers road improvements for the private road Proctor Lane, leading up to Lots 3 and 4 of Parcel Map 15142 - Assessor Parcel Numbers (APNs) of 133-090-017 and -018 in the A-1 Zone
Community Development Director Robles presented the report.

Community Development Director Robles answered questions and addressed concerns.

Public Works Director Blais answered questions and addressed concerns.

Mayor Newton opened Public Comment.

Doug Colville had concerns regarding resolving the titles and merging the properties.

Page 17 of 624 ends

City Council Minutes - December 18, 2024
Nathan Lani spoke regarding his concerns for the properties and future developments if they are sold before the issue is resolved.

Juan Garcia spoke regarding the concerns of grading done on his property and stated no grading had been done. He provided information regarding the stalls and horse keeping area on the property.

Mayor Newton closed Public Comment.

Community Development Director Robles and Public Works Director Blais answered questions and addressed concerns.

Mayor Newton and Council Members discussed the options moving forward with developments and the road improvements.

City Attorney Burns clarified the direction Council Members provided to staff.

No action was taken and Council Members provided direction to staff that the existing developments trigger the road improvements, and the following options are to be discussed with the property owners in order to move forward; to remove the development on the property, keep the development and improve the road, or to give up the private easement, keep the development and merge the parcels with access only from California Avenue. Council Members also provided direction to consider the use of the property and traffic impacts and the possibility of a CUP for the property.

6. PUBLIC HEARING(S)

6.A. First Reading: Ordinance No. 1127, Code Amendment 2024-12, An Ordinance of the City of Norco amending Norco Municipal Code Chapter 3.50 to update participation in the Western Riverside County Transportation Uniform Mitigation (TUMF) Program, and Resolution 2024-56, a resolution to adopt the TUMF schedule.

Community Development Director Robles introduced WRCOG Representative, Cameron Brown, who presented the report.

City Attorney Burns informed the Council Members of a revision to the Ordinance.

Council Members had no questions or concerns.

Mayor Newton opened Public Hearing.

Page 18 of 624 ends

City Council Minutes - December 18, 2024
There were no public comments at this time.

Mayor Newton closed Public Hearing.

Motions were made.

M/S NEWTON/GRUNDMEYER Adopt First Reading of Ordinance No. 1127, amending and updating the City's TUMF Ordinance. The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
M/S GRUNDMEYER/BASH Adopt Resolution No. 2024-56, adopting a TUMF schedule. The Motion was carried by the following roll call vote:

AYES: NEWTON, GRUNDMEYER, BASH, BOWEN, AND SULLIVAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE

7. CITY COUNCIL / STAFF COMMUNICATIONS
Public Works Director Blais thanked Council Members for the approval of the emergency item and provided updates on the N5 Storm Drain Project on Valley View Ave. and the Storm Drain Project on Fourth Street.

Facilities and Maintenance Director Hamilton provided an update regarding the Corydon Staging Area.

City Manager Free thanked Council Members for the appointment as City Manager and wished everyone a Merry Christmas.

Council Member Bowen wished everyone a Merry Christmas.

Page 19 of 624 ends

City Council Minutes - December 18, 2024
Mayor Pro Tem Grundmeyer thanked staff for all of their hard work during the holiday events.

Council Member Sullivan wished everyone a Merry Christmas and Happy New Year.

Council Member Bash thanked staff for their assistance with Pearl Harbor Remembrance Day and all of the holiday events. He asked that a letter be sent in opposition of the AQMD amendments proposing to eliminate all gas appliances and wished everyone a Merry Christmas.

City Manager Free confirmed a letter will be sent.

Mayor Newton wished everyone a Merry Christmas and thanked Staff for all of their hard work throughout the year.

8. ADJOURNMENT
Mayor Newton adjourned the meeting at 9:50 pm.
_________________________________
Dana Roa, CMC
City Clerk

Page 20 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.C.

To: Honorable Mayor and City Council Members
From: Chad Blais, Public Works Director
Prepared By: Sam Nelson, Deputy City Engineer
Department: Public Works
SUBJECT:

Quitclaim and conveyance of Public Storm Drain Easements located within Tract 25779 RECOMMENDATION:

Approve the quitclaim and convey the offer of dedication of the public storm drain easements within Tract 25779, authorize the City Manager to sign the Quitclaim Deeds and direct the City Clerk to forward the executed Quitclaim Deeds to the Riverside County Flood Control & Water Conservation District (RCFC&WCD) for acceptance and recordation.

SUMMARY:

RCFC&WCD is requesting the City of Norco to quitclaim and re-convey three (3) public storm drain easements located within Tract 25779. The easements were dedicated to the City of Norco on behalf of RCFC&WCD in 1999. However, due to an oversight the easements were never turned over to RCFC&WCD.

BACKGROUND:

In 1999 the Riverside County Flood Control & Water Conservation District (RCFC&WCD) entered into an agreement with the City of Norco to accept three (3) storm drain easements (See Tract 25779) and reconvey them to RCFC&WCD as outlined by the executed agreement (See Cooperative Agreement, Section III.4).

Per RCFC&WCD's standard agreement terms and conditions, upon completion of construction they request the public entity accept any dedications made on the District's behalf and then re-convey them via a quitclaim deed for RCFC&WCD's acceptance.

However, the RCFC&WCD recently notified the City of Norco that the re-conveyance of the storm drain easements to the District never went forward resulting in RCFC&WCD having no formal rights to maintain these facilities.

Page 21 of 624 ends

Due to this oversight the RCFC&WCD is requesting that the City of Norco quitclaim and re-convey the three (3) storm drain easements to RCFC&WCD via a quitclaim deed (See three (3) quitclaim deeds).

FISCAL IMPACT:

Not applicable for this item.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction #5 – Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Daphne Liu, Finance Director Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Tract 25779
Cooperative Agreement
Quitclaim Deed 2151-500
Quitclaim Deed 2152-505
Quitclaim Deed 2151-501

Page 22 of 624 ends
Page 23 of 624 ends
Page 24 of 624 ends
Page 25 of 624 ends
Page 26 of 624 ends
Page 27 of 624 ends
Page 28 of 624 ends
Page 29 of 624 ends
Page 30 of 624 ends
Page 31 of 624 ends
Page 32 of 624 ends
Page 33 of 624 ends
Page 34 of 624 ends
Page 35 of 624 ends
Page 36 of 624 ends
Page 37 of 624 ends
Page 38 of 624 ends
Page 39 of 624 ends
Page 40 of 624 ends
Page 41 of 624 ends
Page 42 of 624 ends
Page 43 of 624 ends
Page 44 of 624 ends
Page 45 of 624 ends
Page 46 of 624 ends
Page 47 of 624 ends
Page 48 of 624 ends
Page 49 of 624 ends
Page 50 of 624 ends
Page 51 of 624 ends
Page 52 of 624 ends
Page 53 of 624 ends
Page 54 of 624 ends
Page 55 of 624 ends
Page 56 of 624 ends
Page 57 of 624 ends
Page 58 of 624 ends
Page 59 of 624 ends

258613
Recorded at request of, and return to:

Riverside County Flood Control
and Water Conservation District
1995 Market Street
Riverside, California 92501
NO FEE (GOV. CODE 6103)

SPACE ABOVE THIS LINE FOR RECORDER'S USE
South Norco Channel Line SA, Stage 3 The undersigned grantor(s) declare(s) Project No. 2-0-00151 DTT: - 0 - THE CONVEYANCE IS TO A GOVERNMENTAL Tract No. 25779 ENTITY OR POLITICAL SUBDIVISION R&T 11922 APN Portion of 123-420-014

QUITCLAIM DEED
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, the CITY OF NORCO, a municipal corporation, does hereby remise, release and forever quitclaim to RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, a body corporate and politic, all rights, title and interest in and to the easements for storm drain and maintenance as shown on map, situated in the city of Norco, County of Riverside, State of California, described as follows:

See legal description attached hereto as Exhibit "A", and made part hereof, to be referenced hereafter as RCFC Parcel No. 2151-500.

CITY OF NORCO,
a municipal corporation:

Date: By:

LISETTE FREE, Interim City Manager
ATTEST:

DANA ROA, CMC
Clerk to the City of Norco
By:

City Clerk (SEAL)

Page 60 of 624 ends

2s8616
RIVERSIDE COUNTY FLOOD CONTROL AI{D

WATER CONSERVATION DISTRICT

EXHIBIT ''A''

LEGAL DESCRIPTION
SOUTH NORCO CHANNEL LINE SA, STAGE 3
Parcel No. 2151-500Portion of APN 123-420-014
In the city ofNorco, County of Riverside, State of Califomia, being that certain Storm Drain Easement, shown as Easement Note "8", lying within Lot2I0, Tract No. 25779, filed in Book 284,Pages 20 through 30, inclusive, of Maps, records of said County.

Containing 3,386 Square Feet / .078 acres, more or less DENNIS ODENBAUGHDATE: 1'?C^2-L
No. 9486
Exp. 03-31-2025
I
oo OF c
o
n
AL
AL LA

Page 61 of 624 ends

258613

CERTIFICATE OF ACCEPTANCE
This is to certify that the interest in real property conveyed by the Quitclaim Deed, dated _________________, from the CITY OF NORCO ("Grantor") to RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION ("Grantee"), a body politic, is hereby accepted by the undersigned officer on behalf of the Board of Supervisors of the Riverside County Flood Control and Water Conservation District pursuant to authority conferred by Resolution No. 474 of the Board of Supervisors of said District adopted on May 12, 1961, and the Grantee consents to the recordation thereof by its duly authorized officer.

RIVERSIDE COUNTY FLOOD CONTROL

AND WATER CONSERVATION DISTRICT
Date: By: __________________________
JASON E. UHLEY
General Manager-Chief Engineer
South Norco Channel Line SB, Stage 4
Project No. 2-0-00151
Tract No. 25779
APN Portion of 123-420-014
RCFC Parcel No. 2151-500

Page 62 of 624 ends

258611
Recorded at request of, and return to:

Riverside County Flood Control
and Water Conservation District
1995 Market Street
Riverside, California 92501
NO FEE (GOV. CODE 6103)

SPACE ABOVE THIS LINE FOR RECORDER'S USE
South Norco Channel Line SB, Stage 4 The undersigned grantor(s) declare(s) Project No. 2-0-00152 DTT: - 0 - THE CONVEYANCE IS TO A GOVERNMENTAL Tract No. 25779 ENTITY OR POLITICAL SUBDIVISION R&T 11922 APN Portion of 122-631-001

QUITCLAIM DEED
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, the CITY OF NORCO, a municipal corporation, does hereby remise, release and forever quitclaim to RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, a body corporate and politic, all rights, title and interest in and to the easements for storm drain and maintenance as shown on map, situated in the city of Norco, County of Riverside, State of California, described as follows:

See legal description attached hereto as Exhibit "A", and made part hereof, to be referenced hereafter as RCFC Parcel No. 2152-505.

CITY OF NORCO,
a municipal corporation:

Date: By:

LISETTE FREE, Interim City Manager
ATTEST:

DANA ROA, CMC
Clerk to the City of Norco
By:

City Clerk (SEAL)

Page 63 of 624 ends

258615
RIVERSIDE COUNTY FLOOD CONTROL A}.{D

WATER CONSERVATION DISTRICT

EXHIBIT ''A''

LEGAL DESCRIPTION
SOUTH NORCO CHANNEL LINE SB, STAGE 4
Parcel No. 2152-505Portion of APN 122-631-001Inthe city ofNorco, County of Riverside, State of California, being that certain Storm Drain Easement, shown as EasementNote "8", lying within Lot 54, TractNo. 25779,fi1ed in Book284, Pages 20 through 30, inclusive, of Maps, records of said County.

Containing 4,704 Square Feet / .108 acres, more or less

DENNIS ODENBAUGH
DATE: 1-z c - 2-L{
No. 9486
Exp.0J-J1-2025
9 L
(<\
( otr
tL
*
n
*
c AL\

Page 64 of 624 ends

258611

CERTIFICATE OF ACCEPTANCE
This is to certify that the interest in real property conveyed by the Quitclaim Deed, dated _________________, from the CITY OF NORCO ("Grantor") to RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION ("Grantee"), a body politic, is hereby accepted by the undersigned officer on behalf of the Board of Supervisors of the Riverside County Flood Control and Water Conservation District pursuant to authority conferred by Resolution No. 474 of the Board of Supervisors of said District adopted on May 12, 1961, and the Grantee consents to the recordation thereof by its duly authorized officer.

RIVERSIDE COUNTY FLOOD CONTROL

AND WATER CONSERVATION DISTRICT
Date: By: __________________________
JASON E. UHLEY
General Manager-Chief Engineer
South Norco Channel Line SA, Stage 3
Project No. 2-0-00152
Tract No. 25779
APN Portion of 122-631-001
RCFC Parcel No. 2152-505

Page 65 of 624 ends

258612
Recorded at request of, and return to:

Riverside County Flood Control
and Water Conservation District
1995 Market Street
Riverside, California 92501
NO FEE (GOV. CODE 6103)

SPACE ABOVE THIS LINE FOR RECORDER'S USE
South Norco Channel Line SA, Stage 3 The undersigned grantor(s) declare(s) Project No. 2-0-00151 DTT: - 0 - THE CONVEYANCE IS TO A GOVERNMENTAL Tract No. 25779 ENTITY OR POLITICAL SUBDIVISION R&T 11922 APN Portion of 123-412-002

QUITCLAIM DEED
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, the CITY OF NORCO, a municipal corporation, does hereby remise, release and forever quitclaim to RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, a body corporate and politic, all rights, title and interest in and to the easements for storm drain and maintenance as shown on map, situated in the city of Norco, County of Riverside, State of California, described as follows:

See legal description attached hereto as Exhibit "A", and made part hereof, to be referenced hereafter as RCFC Parcel No. 2151-501.

CITY OF NORCO,
a municipal corporation:

Date: By:

LISETTE FREE, Interim City Manager
ATTEST:

DANA ROA, CMC
Clerk to the City of Norco
By:

City Clerk (SEAL)

Page 66 of 624 ends

2s8617
RI\MRSIDE COUNTY FLOOD CONTROL AI\D

WATER CONSERVATION DISTRICT

EXHIBIT ''A''

LEGAL DESCRIPTION
souTH NoRco CHANNEL LrNE SA, STAGE 3
Parcel No. 2151-501Portion of APN 123-412-002In the city ofNorco, County of Riverside, State of California, being that certain Storm DrainEasement, shown as Easement Note "8", lying within Lot 2I1, Tract No. 25779, filed inBook 284,Pages 20 through 30, inclusive, of Maps, records of said County.

Containing 17,014 Square Feet / .391 acres, more or less.

DENNIS ODENBAUGH
DATE: al-26^24
No. 9486
Exp. 03-31*2025
9 1
o
n
o
L
( OF a Au\

Page 67 of 624 ends

258612

CERTIFICATE OF ACCEPTANCE
This is to certify that the interest in real property conveyed by the Quitclaim Deed, dated _________________, from the CITY OF NORCO ("Grantor") to RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION ("Grantee"), a body politic, is hereby accepted by the undersigned officer on behalf of the Board of Supervisors of the Riverside County Flood Control and Water Conservation District pursuant to authority conferred by Resolution No. 474 of the Board of Supervisors of said District adopted on May 12, 1961, and the Grantee consents to the recordation thereof by its duly authorized officer.

RIVERSIDE COUNTY FLOOD CONTROL

AND WATER CONSERVATION DISTRICT
Date: By: __________________________
JASON E. UHLEY
General Manager-Chief Engineer
South Norco Channel Line SB, Stage 4
Project No. 2-0-00151
Tract No. 25779
APN 123-412-002
RCFC Parcel No. 2151-501

Page 68 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.D.

To: Honorable Mayor and City Council Members
From: Amanda Hamilton, Facilities and Maintenance
Director
Prepared By: Amanda Hamilton, Facilities and Maintenance Director
Department: Facilities and Maintenance
SUBJECT:

Acceptance of Bids and Award of Contract for the Pikes Peak Park ADA Synthetic Poured-In-Place Surfacing Project (Project No. 4407.8)
RECOMMENDATION:

Accept bids and award contract to ORTCO, Inc. in the amount of $456,100; and authorize the City Manager to approve contract change orders up to 10% of the original contract.

SUMMARY:

The Pikes Peak Park Playground Replacement Project (Project No. 4407.8) has been approved as a Capital Improvement Project for Fiscal Year 2024-25. The City of Norco is undertaking improvements to Pikes Peak Park, including the installation of an inclusive playground and ADA-compliant synthetic surfacing. The City Council authorized a contract with GameTime for the playground installation, with materials received; however, installation will proceed upon the award of the proposed subsequent contract. The contract for ADA synthetic surfacing was initially approved but later terminated. The bidding process was reinitiated and following a review of bids, ORTCO, Inc. has been identified as the lowest-responsive bidder at $456,100 and has been confirmed as compliant with all federal regulations. The City Council is hereby requested to approve the award of the contract to ORTCO, Inc. to complete the project.

BACKGROUND:

On July 17, 2024, the City Council authorized a contract with GameTime for the procurement and installation of an inclusive playground at Pikes Peak Park. The playground materials have been received and are currently in the City’s possession.

The contract with GameTime remains active, and installation will proceed upon the award of the proposed subsequent contract.

Page 69 of 624 ends

On September 18, 2024, the City Council authorized a contract for the Pikes Peak ADA Synthetic Poured-In-Place Surfacing Project. However, this contract was terminated, and City staff, with the approval of the City Attorney and the Community Development Block Grant (CDBG) representative, reinitiated the public bidding process. This project is funded through CDBG funds, which are allocated by the U.S. Department of Housing and Urban Development (HUD) to support local development initiatives. The contractor must adhere to all federally mandated CDBG requirements, including compliance with labor standards, equal opportunity regulations, and environmental protections. These requirements ensure the appropriate use of public funds, promote transparency, and safeguard the integrity of the project, ultimately benefiting the community and ensuring responsible management of federal resources. Installation work will commence upon the approval of the new contract.

The proposed contract will address the remaining phases of the project not covered by the GameTime contract, which include the demolition and removal of the existing playground, the reconstruction of the subbase and drainage system, and the installation of a multi-colored PIP rubberized play surface. The PIP rubber surfacing is a critical component for ADA compliance, providing enhanced shock absorption, accessibility, and interactive elements that promote imaginative play and creativity.

Benefits of Rubber Surfacing:

Rubber surfacing is an ideal choice for playgrounds due to its smooth, aesthetically pleasing appearance, vibrant colors, and customizable patterns. It offers several key benefits:

Page 70 of 624 ends

 Economic Efficiency: Rubber surfacing is cost-effective, easy to install, and highly durable, providing a longer lifespan compared to engineered wood fiber.  Safety: It offers superior fall protection and reduces the risk of slips and falls, ensuring the safety of children.
 Low Maintenance: Rubber surfacing requires minimal maintenance, typically only periodic cleaning, and does not attract bacteria or insects.  Environmental Sustainability: Made from recycled tires, rubber surfacing is environmentally friendly.
 Noise Reduction: Rubber tiles can reduce noise levels by up to 18 decibels, improving the quality of outdoor play environments.

Due to its safety and ADA compliance benefits, the City of Norco has adopted rubber surfacing as a best practice for all its playgrounds. This material provides comfort, shock absorbency, and extended playtime for children. When properly installed, rubber surfacing can last up to 15 years, with bidders on this project being mandated to provide a 5-year warranty.

As part of this project, ORTCO, Inc. will oversee the installation of temporary fencing around the playground area for safety purposes. Additionally, ORTCO will manage the installation of signage and public notifications to inform park users about the upcoming improvements to Pikes Peak Park.

On October 25, 2024, the City of Norco, in consultation with the City Attorney and CDBG, terminated the previous contract for the Pikes Peak Park ADA Synthetic Poured-In-Place Surfacing Project. After obtaining approval from the CDBG program coordinator and the City Attorney, City staff reissued the Notice of Inviting Bids on November 7, 2024, via the PlanetBids portal. Bids were received on November 21, 2024, with amounts ranging from $449,826 to $549,000. Upon review, the lowest bid was found to contain irregularities, and on December 26, 2024, Cindbad Industries withdrew their bid.

ORTCO, Inc. is the apparent lowest-responsive bidder with a bid of $456,100. ORTCO, Inc. is a general contractor based in Orange, CA, specializing in the installation of playground equipment. They hold a valid Class B General Building Contractor’s license, as well as Class 61 and D12 licenses for synthetic products required for the rubberized PIP installation. ORTCO has a proven track record of successful PIP installations in the City of Norco, including the PIP surfacing projects at Hawks Crest Park and Pacer Park.

CDBG has reviewed ORTCO, Inc.'s federal documents and their registration at SAM.gov, finding them to be in compliance with all federal regulations governing CDBG funding. Awarding the contract to ORTCO, Inc. will enable the City to proceed with the installation of ADA-compliant synthetic surfacing at Pikes Peak Park, ensuring the playground meets both safety and accessibility standards, while enhancing the play experience for all children. Therefore, it is respectfully requested that the City Council approve the award of the contract for the Pikes Peak Park ADA Synthetic Poured-InPlace Surfacing Project to ORTCO, Inc., in the amount of $456,100.

FISCAL IMPACT:

Page 71 of 624 ends

The Pikes Peak Park Playground Replacement Project (Project No. 4407.8) is approved as a Capital Improvement Project (CIP) for Fiscal Year 2024-25 with a total budget of $1,716,235.

The second phase of this project, known as the Pikes Peak Park ADA Synthetic Poured-In-Place Surfacing Project , will be funded through a combination of remaining CDBG funds and a portion of the Park Development Impact Fee Funds.

The funding breakdown for this phase is as follows:
 $266,235 from CDBG grant funds
 $620,000 from Park Development Impact Fees
 $830,000 from Measure R funds
RELATIONSHIP TO STRATEGIC PLAN:

This item closely aligns with Strategic Plan No. 5. Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Daphne Liu, Finance Director Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Contract Agreement ORTCO, Inc._January 15, 2025
Pikes Peak PIP Surfacing Bid Results
ORTCO, Inc. California Contractors License
Withdraw of Bid-Cinbad
ORTCO, Inc. Proposal and Bid Bond
ORTCO, Inc. Federal Documents
Termination Letter Follow-Up_City of Norco

Page 72 of 624 ends

1 CITY OF NORCO

PIKES PEAK PARK ADA SYNTHETIC POURED-IN-PLACE SURFACE PROJECT

AGREEMENT

1. Parties and Date.

This Agreement is made and entered into this 15th day of January 2025 by and between the City of Norco, a municipal corporation of the State of California, located at 2870 Clark Avenue, Norco, California 92860, County of Riverside, State of California, (hereinafter referred to as “City”) and ORTCO INC., a corporation with its principal place of business at 2163 N. Glassell Street, Orange, California 92865 (hereinafter referred to as “Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.

2. Recitals.

2.1 Contractor.

Contractor desires to perform and assume responsibility for the provisions of Pikes Peak Park ADA Synthetic Poured-In-Place Project on the terms and conditions set forth in this Agreement. Contractor represents that it is experienced in installation of playground synthetic surfaces for public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that is familiar with the plans of the City.

2.2 Project.

The City desires to engage the Contractor to render such services for the PIKES PEAK PARK ADA SYNTHETIC POURED-IN-PLACE SURFACE Project (“Project”) as set forth in this Agreement.

3. Terms.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to construct the improvements outlined by the Pikes Peak Park ADA Synthetic Poured-In-Place Surface Project. The Project is more particularly described in Exhibit A attached hereto and incorporated herein by reference. The Project shall be subject to, and performed in accordance with this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The terms of this Agreement shall begin at the Notice to Proceed and shall complete all work within 45 working days. Contractor shall complete

Page 73 of 624 ends

2 the Services within the term of this Agreement and shall meet any other established schedules and deadlines.

3.2 Responsibilities of Contractor.

3.2.1 Control and Payment of Subordinates; Independent Contractor. The Project shall be constructed by Contractor or under its supervision. Contractor will determine the means, methods and details of constructing the Project subject to the requirements of this Agreement. City retains Contractor on an independent contractor basis and not as an employee. Any additional personnel constructing the Project under this Agreement on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with the construction of the Project under this Agreement and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation insurance.

3.2.2 Schedule of Services. Contractor shall construct the Project expeditiously, within the term of this Agreement, and in accordance with the Project timeframe set forth herein. Contractor represents that it has the professional and technical personnel required to construct the Project in conformance with such conditions. In order to facilitate Contractor’s conformance with the Project timeframe, City shall respond to Contractor’s Requests for Information in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Project timeframe.

3.2.3 Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City.

3.2.4 City’s Representative. The City hereby designates the Director of Facilities and Maintenance or her designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Agreement. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.2.5 Contractor’s Representative. Contractor hereby designates Lynn Ortlieb, President, or her designee, to act as its representative for the performance of this Agreement (“Contractor’s Representative”). Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement. The Contractor’s Representative shall supervise and direct the Project, using her best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Project under this Agreement.

Page 74 of 624 ends

3 3.2.6 Coordination of Project. Contractor agrees to work closely with City staff in the construction of the Project and shall be available to City’s staff, consultants and other staff at all reasonable times.

3.2.7 Standard of Care; Performance of Employees. Contractor shall construct the Project under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to construct the Project. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to construct the Project. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to construct the Project, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor’s failure to comply with the standard of care provided for herein. Any employee of the Contractor or its subcontractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to construct the Project in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be re-employed to perform any work on the Project.

3.2.7.1 Period of Performance and Liquidated Damages. Contractor shall perform and complete the Project under this Agreement within the term set forth in Section

3.1.2 above (“Term”). Contractor shall construct the Project in strict accordance with any timeframe provided herein, or which may be provided separately in writing to the Contractor. Contractor agrees that if the Project is not completed within the aforementioned Term and/or pursuant to any such completion schedule or Project milestones developed pursuant to provisions of this Agreement, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum of $500.00 per working day:

3.2.8 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Project. If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

Page 75 of 624 ends

4 3.2.9 Insurance.

Insurance.

3.2.9.1 Time for Compliance. Contractor shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section.

3.2.9.2 Minimum Requirements. Throughout the life of this Contract, Contractor shall pay for and maintain in full force and effect all policies of insurance required hereunder with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated not less than “A- VII” in Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by City Manager or his/her designee at any time and in his/her sole discretion. The following policies of insurance are required:
(i) COMMERCIAL GENERAL LIABILITY insurance which shall be at least as broad as the most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01 and include insurance for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non-owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Contract) with limits of liability of not less than the following:
$2,000,000 per occurrence for bodily injury and property damage $1,000,000 per occurrence for personal and advertising injury $2,000,000 aggregate for products and completed operations $4,000,000 general aggregate
(ii) COMMERCIAL AUTOMOBILE LIABILITY insurance which shall be at least as broad as the most current version of Insurance Service Office (ISO) Business Auto Coverage Form CA 00 01, and include coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1 Any Auto) with limits of liability of not less than $1,000,000 per accident for bodily injury and property damage. (iii) WORKERS’ COMPENSATION insurance as required under the California Labor Code.

(iv) EMPLOYERS’ LIABILITY insurance with limits of liability of not less than $1,000,000 each accident, $1,000,000 disease policy limit and $1,000,000 disease each employee.

Page 76 of 624 ends

5 (v) BUILDERS RISK (Course of Construction) insurance in an amount equal to the completed value of the project with no coinsurance penalty provisions. (Only required if the project includes new construction of a building; or renovation of, or addition to, an existing building.)
(vi) CONTRACTORS POLLUTION LIABILITY (Unless waived in writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is required for all environmental and water remediation work and for all work transporting fuel. Unless waived in writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is also required for demolition, renovation, HVAC, plumbing or electrical (including, without limitation, lighting) work on any structure built prior to the year 1990.) insurance with limits of liability of not less than the following:
$1,000,000 per occurrence or claim
$2,000,000 general aggregate per annual policy period
In the event Contractor purchases an Umbrella or Excess insurance policy(ies) to meet the minimum limits of insurance set forth above, this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies).

Should this Contract involve any lead based, mold or asbestos environmental hazard, either the Automobile Liability insurance policy or the Contractors Pollution Liability insurance policy shall be endorsed to include Transportation Pollution Liability insurance covering materials to be transported by Contractor pursuant to the Contract.

In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental hazards. In the event this Contract involves any asbestos environmental hazard (e.g., asbestos remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for asbestos environmental hazards. In the event this Contract involves any mold environmental hazard (e.g., mold remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for mold environmental hazards and “microbial matter including mold” within the definition of “Pollution” under the policy.

Contractor shall be responsible for payment of any deductibles contained in any insurance policies required hereunder and Contractor shall also be responsible for payment of any self-insured retentions. Any deductibles or self-insured retentions must be declared to, and approved by, the City Manager or his/her designee in his/her sole discretion. At the option of the City Manager or his/her designee, either (i) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees and agents; or (ii) Contractor shall provide a financial guarantee, satisfactory to the City Manager or his/her designee in his/her sole discretion, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall City be responsible for the payment of any deductibles or self-insured retentions.

Page 77 of 624 ends

6 All policies of insurance required hereunder shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after 30 calendar day written notice has been given to City. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, Contractor shall furnish City with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for City, Contractor shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than 15 calendar days prior to the expiration date of the expiring policy.

The General Liability and Automobile Liability insurance policies shall be written on an occurrence form. The Contractors Pollution Liability insurance policy shall be written on either an occurrence form, or a claims-made form. The General Liability (including ongoing operations and completed operations), Automobile Liability and Contractors Pollution Liability insurance policies shall name City, its officers, officials, employees and agents as an additional insured. All such policies of insurance shall be endorsed so Contractor’s insurance shall be primary and no contribution shall be required of City, its officers, officials, employees and agents. The Builders Risk (Course of Construction) insurance policy shall be endorsed to name the City as a loss payee. Any Workers’ Compensation insurance policy shall contain a waiver of subrogation as to City, its officers, officials, employees and agents. The coverage(s) shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees and agents. If Contractor maintains higher limits of liability than the minimums shown above, City requires and shall be entitled to coverage for the higher limits of liability maintained by Contractor.

Claims-Made Policies – If any coverage required is written on a claims-made coverage form:
(i) The retroactive date must be shown, and must be before the effective date of the Contract or the commencement of work by Contractor.
(ii) Insurance must be maintained and evidence of insurance must be provided for at least 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iii) If coverage is canceled or non-renewed, and not replaced with another claimsmade policy form with a retroactive date prior to the effective date of the Contract, or work commencement date, Contractor must purchase extended reporting period coverage for a minimum of 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iv) A copy of the claims reporting requirements must be submitted to City for review. (v) These requirements shall survive expiration or termination of the Contract.

Page 78 of 624 ends

7 Contractor shall furnish City with all certificate(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the City’s Risk Manager or his/her designee in his/her sole discretion prior to City’s execution of the Contract and before work commences. Upon request of City, Contractor shall immediately furnish City with a complete copy of any insurance policy required under this Contract, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Contract.

If at any time during the life of the Contract or any extension, Contractor or any of its subcontractors fail to maintain any required insurance in full force and effect, all work under this Contract shall be discontinued immediately, and all payments due or that become due to Contractor shall be withheld until notice is received by City that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to City. Any failure to maintain the required insurance shall be sufficient cause for City to terminate this Contract. No action taken by City hereunder shall in any way relieve Contractor of its responsibilities under this Contract.

The fact that insurance is obtained by Contractor shall not be deemed to release or diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this Contract. The duty to indemnify City shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Contractor, its principals, officers, agents, employees, persons under the supervision of Contractor, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them.

In the event of a partial or total destruction by the perils insured against of any or all of the work and/or materials herein provided for at any time prior to the final completion of the Contract and the final acceptance by the City of the work or materials to be performed or supplied thereunder, the Contractor shall promptly reconstruct, repair, replace, or restore all work or materials so destroyed or injured at his/her sole cost and expense. Nothing herein provided for shall in any way excuse the Contractor or his/her insurance company from the obligation of furnishing all the required materials and completing the work in full compliance with the terms of the Contract.

If Contractor should subcontract all or any portion of the services to be performed under this Contract, Contractor shall require each subcontractor to provide insurance protection in favor of City, its officers, officials, employees and agents in accordance with the terms of each of the preceding paragraphs, except that the subcontractors’ certificates and endorsements shall be on file with Contractor and City prior to the commencement of any work by the subcontractor.

3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In constructing the Project, the Contractor

Page 79 of 624 ends

8 shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.2.11 Bonds.

3.2.11.1 Performance Bond. Contractor shall execute and provide to City concurrently with this Agreement a Performance Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City.

3.2.11.2 Payment Bond. Contractor shall execute and provide to City concurrently with this Agreement a Payment Bond in the amount of the total, not-toexceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by City.

3.2.11.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this section are accepted by the City. To the extent, if any, that the total compensation is increased in accordance with the Agreement, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City.

To the extent available, the bonds shall further provide that no change or alteration of the Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Agreement for cause.

3.2.11.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the City. If a California admitted surety insurer

Page 80 of 624 ends

9 issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.3 Fees and Payments.

3.3.1 Compensation. Contractor shall receive compensation, including authorized reimbursements, for all construction services rendered under this Agreement at the rates set forth in Exhibit B attached hereto and incorporated herein by reference.

Extra work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

3.3.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement which indicates work completed by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

3.3.3 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

3.3.5 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.4 Accounting Records.

Page 81 of 624 ends

10 3.4.1 Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of five (5) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services which have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Agreement except for cause.

3.5.1.2Effect of Termination. If this Agreement is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request.

3.5.1.3Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the follow address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor:

ORTCO, INC.
2163 N. Glassell Street
Orange, CA 92865
Attention: Lynn Ortlieb
City:

City of Norco
2870 Clark Avenue
Norco, CA 92860
Attention: Director of Facilities and Maintenance

Page 82 of 624 ends

11 Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the US Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.4 Attorney’s Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the parties shall each bear their own attorney’s fees.

3.5.5 Indemnification. Contractor shall defend, indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage, or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants, and contractors arising out of or in connection with the construction of the Project, or this Agreement, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses. Contractor shall defend, at Contractor’s own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents, or volunteers. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents, or volunteers, in any such suit, action or other legal proceeding. Contractor shall reimburse City and its directors, officials, officers, employees, agents, and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, official’s officers, employees, agents, or volunteers.

3.5.6 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.7 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County.

3.5.8 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.9 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project.

Page 83 of 624 ends

12 3.5.10 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.11 Assignment or Transfer. Contractor shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.12 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be work days (Monday through Friday, excluding holidays). All references to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content or intent of this Agreement.

3.5.13 Amendment; Modification. No supplement, modification or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

3.5.15 No Third Party Beneficiaries. There are no intended third-party beneficiaries of any right or obligation assumed by the Parties.

3.5.16 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Contractor further agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the

Page 84 of 624 ends

13 term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.18 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer, and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.20 Authority to Enter Agreement. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement.

Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.21 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Contractor shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

3.7 Special Federal Requirements.

3.7.1 Contractor and Owner do hereby acknowledge that this project will be partially or fully funded with Community Development Block Grant (CDBG) funds [24 CFR 570] and is therefore subject to applicable Federal procurement, labor, environmental, equal opportunity, and other regulations.

3.7.2 Contractor shall maintain and keep books and records on a current basis, recording all transactions pertaining to this agreement in a form in accordance with generally acceptable accounting principles. Said books and records shall be made available to the County, the State of California, the Federal government, and to any authorized representative thereof for the purposes of audit

Page 85 of 624 ends

14 at all reasonable times and places. All such books and records shall be retained for such periods of time as required by law, provided, however, notwithstanding any shorter periods of retention, all books, records, and supporting detail shall be retained for a period of at least four (4) years after the expiration of the term of this Agreement.

3.7.3 Contractor shall comply with the Davis-Bacon Fair Labor Standards Act (40 U.S.C.A. Section 3141-3148) and the implementation regulations thereof. Contractor shall comply with the U.S. Department of Housing and Urban Development’s Federal Labor Standards Provisions (HUD 4010).

Contractor acknowledges that the applicable Wage Determination for this project is:

General Decision Number: CA20240025
Modification Number: 15
Date: 10/18/2024

3.7.4 Section 3 Compliance: The Contractor hereby acknowledges that this federally-funded project is subject to Section 3 of the Housing and Urban Development Act of 1968 [12 U.S.C. 1701u and 24 CFR Part 75] and agrees to the following:

3.7.5 The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing.

3.7.6. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 75, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the Part 75 regulations.

3.7.7 The contractor agrees to send to each labor organization or representative of workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers' representative of the contractor's commitments under this Section 3 clause and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin.

Page 86 of 624 ends

15 3.7.8 The contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR Part 75, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulations in 24 CFR Part 75. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR Part 75.

3.7.9 The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR Part 75 require employment opportunities to be directed, were not filled to circumvent the contractor's obligations under 24 CFR Part 75.

3.7.10 Noncompliance with HUD's regulations in 24 CFR Part 75 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.

3.7.11 With respect to work performed in connection with Section 3 covered Indian housing assistance, Section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b) requires that to the greatest extent feasible (i) preference and opportunities for training and employment shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned Economic Enterprises. Parties to this contract that are subject to the provisions of Section 3 and Section 7(b) agree to comply with Section 3 to the maximum extent feasible, but not in derogation of compliance with Section7(b).

3.8 Additional Federal Requirements

3.8.1 Whereas, the work under this Agreement is subject to applicable Federal, State, and local laws and regulations, including but not limited to the regulations pertaining to the Community Development Block Grant program (24 CFR Part 570) and the Uniform Administrative Requirement, Cost Principles, and Audit Requirements for Federal Awards (2 CFR Part 200). Contractor, subcontractors, Consultants, and sub-consultants agree to comply with, and are subject to, all applicable requirements as follows:

3.8.2 Equal Employment Opportunity - Compliance with Executive Order 11246 of September 24, 1965, entitled "Equal Employment Opportunity", as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR Part 60). The Contractor/Consultant will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, general identity or national origin.

Contractor/Consultant will ensure that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex sexual

Page 87 of 624 ends

16 orientation, general identity or national origin. The Contractor/Consultant will take affirmative action to ensure that applicants are employed and the employees are treated during employment, without regard to their race color, religion, sex, sexual orientation, general identity or national origin. Such actions shall include, but are not limited to, the following: employment, up-grading, demotion, or transfer; recruitment or recruitment advertising; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor/Consultant agrees to post in a conspicuous place, available to employees and applicants for employment, notices to be provided by the County setting forth the provisions of this non-discriminating clause.

3.8.3 Copeland “Anti-Kickback” Act (18 U.S.C. 874 and 40 U.S.C.A.

Section 3145): All contracts and subgrants in excess of $2,000 for construction or repair awarded by recipients and subrecipients shall include a provision for compliance with the Copeland “Anti-Kickback” Act (18 U.S.C. 874), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient shall be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he is otherwise entitled. The recipient shall report all suspected or reported violations to HUD.

3.8.4 Davis-Bacon Act, as amended (40 U.S.C.A. Section 3141-3148):

When required by Federal program legislation, all construction contracts awarded by the recipients and subrecipients of more than $2000 shall include a provision for compliance with the Davis-Bacon Act (40 U.S.C. A. Section 3141-3148) and as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Governing Federally Financed and Assisted Construction”). Under the Davis Bacon Act, contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by the U.S. Secretary of Labor. In addition, contractors shall be required to pay wages not less than once a week. The recipient shall place a copy of the current prevailing wage determination issued by the U.S.

Department of Labor in each solicitation and the award of a contract shall be conditioned upon the acceptance of the wage determination. The recipient shall report all suspected or reported violations to HUD.

3.8.5 Contract Work Hours and Safety Standards Act (40 U.S.CA.. 32701 through 3708): Where applicable, all contracts awarded by recipients in excess of $2,000 for construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or laborers shall include a provision for compliance with the Contract Work Hours and Safety Standards (40 U.S.C.A. 32701–3708), as supplemented by Department of Labor Regulations (29 CFR Part 5). Under Section 40 U.S.C.A. 3702, each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a standard workweek of 40 hours. Work in excess of the standard workweek is permissible

Page 88 of 624 ends

17 provided that the worker is compensated at a rate of not less than 1 1/2 times the basic rate of pay for all hours worked in excess of 40 hours in the workweek. 40 U.S.C.A. 3704of the Act is applicable to construction work and provides that no laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

3.8.6 Rights to Inventions Made Under a Contract or Agreement— Contracts or agreements for the performance of experimental, developmental, or research work shall provide for the rights of the Federal Government and the recipient in any resulting invention in accordance with 37 CFR part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by HUD.

3.8.7 Rights to Data and Copyrights – Contractors and consultants agree to comply with all applicable provisions pertaining to the use of data and copyrights pursuant to 48 CFR Part 27.404-3, Federal Acquisition Regulations (FAR).

3.8.8 Air Pollution Prevention and Control (formally known as the Clean Air Act) (42 U.S.C.A. 7401 et seq.) and the Federal Water Pollution Control Act (33 U.S.C.A. Section 1251 et seq.), as amended:—Contracts and subgrants of amounts in excess of $100,000 shall contain a provision that requires the recipient to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401 et seq.) and the Federal Water Pollution Control Act as amended (33 U.S.C.A. 1251 et seq.). Violations shall be reported to HUD and the Regional Office of the Environmental Protection Agency (EPA).

3.8.9 Byrd Anti-Lobbying Amendment (31 U.S.C.A. 1352)— Contractors who apply or bid for an award of $100,000 or more shall file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award.

Such disclosures are forwarded from tier to tier up to the recipient.

3.8.10 Debarment and Suspension (Executive Orders (E.O. s) 12549 and 12689)—No contract shall be made to parties listed on the General Services Administration's List of Parties Excluded from Federal Procurement or Nonprocurement Programs in accordance with E.O.s 12549 and 12689, “Debarment and Suspension,” as set forth at 24 CFR part 2424. This list contains the names of parties debarred, suspended, or otherwise excluded by agencies,

Page 89 of 624 ends

18 and contractors declared ineligible under statutory or regulatory authority other than E.O. 12549. Contractors with awards that exceed the small purchase threshold shall provide the required certification regarding its exclusion status and that of its principal employees.

3.8.11 Drug-Free Workplace Requirements— The Anti-Drug Abuse Act of 1988 (41 U.S.C.A. Section 8101-8103)requires grantees (including individuals) of federal agencies, as a prior condition of being awarded a grant, to certify that they will provide drug-free workplaces. Each potential recipient must certify that it will comply with drug-free workplace requirements in accordance with the Act and with HUD's rules at 24 CFR part 2425.

3.8.12 Access to Records and Records Retention: The Consultant or Contractor, and any sub-consultants or sub-contractors, shall allow all duly authorized Federal, State, and/or County officials or authorized representatives access to the work area, as well as all books, documents, materials, papers, and records of the Consultant or Contractor, and any sub-consultants or subcontractors, that are directly pertinent to a specific program for the purpose of making audits, examinations, excerpts, and transcriptions. The Consultant or Contractor, and any sub-consultants or sub-contractors, further agree to maintain and keep such books, documents, materials, papers, and records, on a current basis, recording all transactions pertaining to this agreement in a form in accordance with generally acceptable accounting principles. All such books and records shall be retained for such periods of time as required by law, provided, however, notwithstanding any shorter periods of retention, all books, records, and supporting detail shall be retained for a period of at least four (4) years after the expiration of the term of this Agreement.

3.8.13 Federal Employee Benefit Clause: No member of or delegate to the congress of the United States, and no Resident Commissioner shall be admitted to any share or part of this agreement or to any benefit to arise from the same.

3.8.14 Energy Efficiency: Mandatory standards and policies relating to energy efficiency which are contained in the State energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94A 163, Dec. 22, 1975; 42 U.S.C.A. Section 6201, et. seq., 89 Stat. 871).

3.8.15 Procurement of Recovered Materials (2 CFR 200.322.) Non Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with 42 U.S.C. Section 6962 of the Solid Waste Disposal Act (42 U.S.C.A. Section 6901, et seq.), as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity

Page 90 of 624 ends

19 acquired by the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

3.8.16 Build America, Buy America (BABA) Act: The Grantee must comply with the requirements of the Build America, Buy America (BABA) Act, 41 USC 8301 note, and all applicable rules and notices, as may be amended, if applicable to the Grantee’s infrastructure project. Pursuant to HUD’s Notice, “Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance” (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.

3.8.17 Violence Against Women Act (VAWA): VAWA provides housing protections for survivors of domestic and dating violence, sexual assault and stalking (‘domestic violence”). VAWA 2022 reauthorizes, amends, and strengthens the VAWA of 1994, as amended (Pub. L. 103-322, tit. IV, sec. 40001-40703; 34 U.S.C. 12291 et seq.) HUD’s implementing regulations for VAWA’S protections, rights, and responsibilities are codified in 24 CFR part 5, subpart L, and related provisions in HUD’s program regulations (HUD’s VAWA regulations). VAWA 2022 amendments took effect on October 1, 2022 and 2022 VAWA’s reauthorization includes new implementation requirements. Grantees, subrecipients and developers shall ensure compliance with all requirements of VAWA including but not limited to: (a) Assure domestic violence survivors are not denied assistance as an applicant, or evicted, or have assistance terminated as a tenant because applicant or tenant is or has been a victim of domestic violence; (b) Implement an emergency transfer plan allowing domestic violence survivor to move to another safe and available unit; (c) Provide protections against denial, terminations, and evictions that directly result from being a victim of domestic violence; (d) Implement a low barrier certification process and allow self-certification of domestic violence.

Page 91 of 624 ends

20 ORTCO INC.:
*By:
____________________________________________
Signature
____________________________________________
Name and Title
NOTE: SIGNATURES OF CORPORATE OFFICIALS MUST BE NOTARIZED. ATTACH CERTIFICATE OF NOTARY ACKNOWLEGMENT.

OWNER: CITY OF NORCO, a municipal corporation
*By:
________________________________________________
Greg Newton, Mayor
ATTEST:
________________________________________________
Dana Roa, CMC City Clerk
APPROVED AS TO FORM:
________________________________________________
Harper & Burns, LLP
City Attorney

Page 92 of 624 ends

21 EXHIBIT A

PIKES PEAK PARK ADA SYNTHETIC POURED-IN-PLACE SURFACE PROJECT

SCOPE OF WORK
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of the demolition and removal of the existing playground, demolition and removal of the existing wood fiber chips, demolition and removal of the existing subbase and concrete ramps, relocation of drainage as needed, inspection of drainage and repairs as needed to ensure proper drainage, installation of playground subbase, installation of pour-in-place synthetic surfacing for the playground areas at Pikes Peak Park located at 97 Sixth Street, Norco, CA 92860 as described in the Specifications to the satisfaction and acceptance of the Facilities and Maintenance Director completed in 45 working days.

Page 93 of 624 ends

22 EXHIBIT B

ORTCO PROPOSAL

Page 94 of 624 ends
Page 95 of 624 ends
Page 96 of 624 ends
Page 97 of 624 ends
Page 98 of 624 ends
Page 99 of 624 ends
Page 100 of 624 ends
Page 101 of 624 ends
Page 102 of 624 ends
Page 103 of 624 ends
Page 104 of 624 ends
Page 105 of 624 ends
Page 106 of 624 ends
Page 107 of 624 ends
Page 108 of 624 ends
Page 109 of 624 ends
Page 110 of 624 ends

City of Norco
Bid Results for Project PIKES PEAK PARK ADA SYNTHETIC POURED-IN-PLACE SURFACING PROJECT (CDBG Funded) (4407.8)Issued on 11/07/2024Bid Due on November 21, 2024 10:00 AM (PST)Item Num Description Unit of Measure Quantity
Cinbad Industry Inc -
Unit Price Withdrew Bid
Cinbad Industry Inc -
Line Total Withdrew Bid
Ortco, Inc. - Unit Price
Ortco, Inc. - Line Total
Act 1 Construction Inc - Unit Price
Act 1 Construction Inc - Line Total
VENTURE CONSTRUCTION & MANAGEMENT - Unit Price
VENTURE CONSTRUCTION & MANAGEMENT - Line Total YMC - Unit Price YMC - Line Total 1 Mobilization & NPDES/BMPs LS 1 $10,000.00 $10,000.00 $13,500.00 $13,500.00 $33,500.00 $33,500.00 $24,000.00 $24,000.00 $30,000.00 $30,000.00 2 Provide and Install Project Sign and post for Community Development Block Grant Projects. Exhibit B-3 of Special Federal Provisions EA 1 $11,000.00 $11,000.00 $1,000.00 $1,000.00 $4,500.00 $4,500.00 $8,700.00 $8,700.00 $9,000.00 $9,000.00 3 Provide and Install Temporary Secured Construction Fencing with Privacy Screen for the Perimeter of Both Playground Areas for LS 1 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 $7,250.00 $7,250.00 $20,000.00 $20,000.00 4 Remove and Dispose of Existing Fibar Woodchips as shown Exhibit A. LS 1 $20,000.00 $20,000.00 $41,600.00 $41,600.00 $20,000.00 $20,000.00 $32,625.00 $32,625.00 $3,000.00 $3,000.00 5 Remove and Dispose of Existing Concrete EA 2 $2,200.00 $4,400.00 $3,000.00 $6,000.00 $2,000.00 $4,000.00 $1,885.00 $3,770.00 $18,000.00 $36,000.00 6 Remove and Dispose of the Existing Playground Structures shown in Exhibit A. LS 1 $22,000.00 $22,000.00 $20,000.00 $20,000.00 $25,000.00 $25,000.00 $21,750.00 $21,750.00 $38,000.00 $38,000.00 7 Remove and Dispose of the Existing Subbase Materials shown in Exhibit A. LS 1 $30,000.00 $30,000.00 $2,000.00 $2,000.00 $20,000.00 $20,000.00 $26,825.00 $26,825.00 $18,000.00 $18,000.00 8 Adjust and Clear Existing Drainage Inlets for Both Playground Areas As Required by the Parks Superintendent LS 1 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $8,000.00 $8,000.00 $1,450.00 $1,450.00 $18,000.00 $18,000.00 9 Installation of Subbase as per the FlexGround Standard or Approved Equal LS 1 $30,000.00 $30,000.00 $34,700.00 $34,700.00 $85,000.00 $85,000.00 $51,475.00 $51,475.00 $12,000.00 $12,000.00 10 Installation of Poured In Place Safety Surfacing as per the FlexGround Standard or Approved Equal. Playground PIP Design and SF color LS 1 $305,426.00 $305,426.00 $319,300.00 $319,300.00 $282,520.00 $282,520.00 $333,600.00 $333,600.00 $342,000.00 $342,000.00 11 Five (5) Year Warranty LS 1 $0.00 $0.00 $5,000.00 $5,000.00 $100.00 $100.00 $5,800.00 $5,800.00 $15,000.00 $15,000.00 12 Demolition Deposit/ Disposal of All Materials with Documentation LS 1 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $1,300.00 $1,300.00 $8,000.00 $8,000.00 Subtotal $449,826.00 $456,100.00 $502,620.00 $518,545.00 $549,000.00 Total $449,826.00 $456,100.00 $502,620.00 $518,545.00 $549,000.00

Page 111 of 624 ends

Data current as of 1/3/2025 11:54:37 AM
Home | Online Services | License Details
Contractor's License Detail for License #
657695
DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations.

Business Information

ORTCO INC
2163 N GLASSELL STREET
ORANGE, CA 92865
Business Phone Number:(714) 998-3998
Entity Corporation
Issue Date 10/29/1992
Expire Date 10/31/2026
License Status
This license is current and active.

All information below should be reviewed.

Classifications
Bonding Information
Contractor's Bond
This license filed a Contractor's Bond with SURETEC INSURANCE COMPANY.

Bond Number: 4380166
Bond Amount: $25,000
Effective Date: 01/01/2023
Contractor's Bond History
Bond of Qualifying Individual
The qualifying individual LYNN ALAN ORTLIEB certified that he/she owns 10 percent or more of the voting stock/membership interest of this company; therefore, the Bond of Qualifying Individual is not required.

Effective Date: 05/23/2012
BQI's Bond History
CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure click on link that will appear below for more information. Click here for a definition of disclosable actions. 
 Only construction related civil judgments reported to CSLB are disclosed (B&P 7071.17).  Arbitrations are not listed unless the contractor fails to comply with the terms.  Due to workload, there may be relevant information that has not yet been entered into the board's license database.  B - GENERAL BUILDING
 C-61 / D34 - PREFABRICATED EQUIPMENT
 C-61 / D12 - SYNTHETIC PRODUCTS
 C-61 / D03 - AWNINGS

Page 112 of 624 ends

Copyright © 2025 State of California
Workers' Compensation
This license has workers compensation insurance with the CLEAR SPRING PROPERTY AND

CASUALTY COMPANY
Policy Number:CSWC03526301
Effective Date: 10/01/2024
Expire Date: 10/01/2025
Workers' Compensation History
Workers' compensation classification code(s):
5187 - Description Unavailable
5205 - Description Unavailable
5102 - Iron/Steel Erection-non-structural
For a description of the workers' compensation classification code(s) listed for this licensee, contact the licensee’s insurance carrier. Contact information for the licensee's insurer is available by clicking the insurer link above. Classification codes are also available on the Workers' Compensation Insurance Rating Bureau's classification search page.

The board does not verify or investigate the accuracy of classification codes displayed.

Back to Top Conditions of Use
Privacy Policy Accessibility
Accessibility Certification

Page 113 of 624 ends


















 !


"!
# $ %
&!'()*+,
-),./0
12()*+,(),./0304+(5246 "
78
9:;:<;:=:>
>?>@
AB
C4+),+
D+4()
1CD+4()32(5)/252+5.6
:
++284E).

F9=
GHI
J,K2)L9M
J+=NO+:L/M
PQ

RSTUVTW
XY
TZY
[Q\]VZT[QU^
_`Z
aQVW
b]TUcd
e_Z
\]Y
fgg_Z\`UQ\hi
jQUkYZYlhW
mT]YV
RnYV
oQUnTV
pUV`d\ZhW
qZYdQVYU\

rstsu
svvwvxty
oQUnTVQUV`d\ZhzhSTQlik_S
{|
}~€‚ƒ„

†‡ˆ‡‰Š‡€
‹Œ

‹‹Ž
ƒ
‹‘Œ‘Ž
’“
’”}

•‰ƒ|‚ƒ
–ƒ‰—˜™|
šƒ~ƒ‰—˜™|›ˆ—œ|™€ˆ™œˆƒœ
ž€™‡
PYll_
mT]YVŸ
b]TUc
h_`
e_Z
h_`Z
lY\\YZ
TUV
nQV
k_ZZYk\Q_Udi
qlYTdY
U_\Y
\]T\
\]Y
U_UwZYdg_UdQ Y
g_Z\Q_Ud
_e
h_`Z
nQV
[YZY
ST\YZQTl
TUV
Tll_[QU^
h_`
\_
k_ZZYk\
dTQV
g_Z\Q_Ud
[_`lV
gZ_ QVY
oQUnTV
pUV`d\Zh
[Q\]
TU
`UeTQZ
k_SgY\Q\Q Y
TV TU\T^Y¡
\]YZYe_ZYW
\]Y
YZZ_Zd
QU
ZYdg_UVQU^
kTUU_\
nY
[TQ YVi
¢`Z\]YZW
TUV
QU
QUVYgYUVYU\
\]YZY_eW
oQ\h
Y£YZkQdYd
Q\d
VQdkZY\Q_U
\_
ZYe`dY
\_
Tll_[
nQV
k_ZZYk\Q_Ui

j\Tee
[Qll
ZYk_SSYUV
h_`Z
nQV
nY
ZY¤Yk\YV
Td
U_UwZYdg_UdQ Yi
j\Tee
Qd
Tld_
k_UdQVYZQU^
gZ_g_dQU^
o_`UkQl
eQUV
\]T\
h_`
TZY
T
U_Uw
ZYdg_UdQnlY
nQVVYZi
qlYTdY
QUe_ZS
Qe
h_`
VYdQZY
\_
[Q\]VZT[
h_`Z
nQVi

¥YdgYk\e`llhW
RSTUVT

¦§¨©ª¨
«¨§¬­®¯©
°±²³´µ¶²
¶·
¸¹´±º±µ±³»
¹¼½
¾¹±¼µ³¼¹¼´³
¿ÀÁÂ
ú¹²Ä
ÅÆ³Ç
ȶ²´¶Ç
ÃÅ
É¿ÀÊÂ
Ë··±´³Ì
ÍÉÎÏÐ
¿ÁÂÑÎÊÒÒ
Ó
óººÌ
ÍÉÎÏÐ
¿ÒÎÑÊÀÉÎ
ÔÔÔÕÖרÙ×ÕÙÚÕÛÜ
Ó
ÝÞÚßàáâ×ÖãÙàÕÖרÙ×ÕÙÚÕÛÜ
ö¼¼³´µ
ä±µå
æ»ç
èÚÙéê××ë
Ó
ìÔàââéØ
Ó
íàßé×
Ó
îàïáé
Ó
ð×êàáé
Ýññ

òóôõö
÷ø


øø

ø
 ö







!

"#
$ôö
%
&ø

%&ø

ø


'()*ö
+,-./
0!
12

3


0

4
5ø
3
÷ø
 ø

 ø
1607ø8

9:;$<=>ö
.4ø
ø
 ø?ø
3 
ø
3
4
 ?ø@2



ø
A
øA
7
B
4

7





?ø@
4


AC
4


ø
3
÷

4
.A
ø3



ø

–‡˜˜™
•‰ƒ|‚ƒ

’˜‡ƒ‡
‡‡
ƒƒˆ~‡‚
™€
˜‡‡€
—|
€‡Dƒ€‚
™

EFGHIJEKLGJMNMJOPQRSHRFTJEUVLHWXYZXE[KTH
OVL\KTFQ]JELU^HTR_JYQ`FRKRFUQJaJbbcdef
ghijklkmno
pƒ~‡‚
•Ї‚
q—|Šƒ‚
r|‚€„

’€‡—‚‡|

stutv
t‹‹w‹Žux
q—|Šƒ‚—|‚€„›„‰ƒ—˜œˆ™‰
{|
“™|‚ƒ„

†‡ˆ‡‰Š‡€
uŒ

‹‹Ž
ƒ
‹‹y
’“
’”}

•‰ƒ|‚ƒ
–ƒ‰—˜™|
šƒ~ƒ‰—˜™|›ˆ—œ|™€ˆ™œˆƒœ
ž€™‡

Page 114 of 624 ends





       



 


  





!

"

"

"#
#$!




$
%

&'
(

!
 ! )*+,"
 

-

./
-

 
-
 !,
 

'#

,





 
!

%0

)
 +'

1!-

23456474389:;5
<=>?@AB>BCDE@=F=A=?GEHIJE=HA?HEH@?
KLMNOFE>PQR?STB>@BSOQUKLVN
WCC=@?XYUZ[\KMN]ZV^^_O?FFXYUZ[\K^Z]VLUZ
```abcdecaefagh_ijfklmncboelabcdecaefagh
OBHH?@Ap=AqrGstfeuvccw_x`lnnud_ylkuc_zl{mu_|cvlmui}} 

Page 115 of 624 ends

CITYOF NORCO

PROPOSAL
PIKES PEAK PARK ADA SYNTHETICPOURED-lN-PLACESURFACE PROJECT TO CITYOF NORCO, as AGENCY:

In accordance with AGENCY’S “Notice Inviting Sealed Bids,” the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein.

BIDDERdeclares that this proposal is based upon careful examination of the work site, Specifications, Instructions to Bidders, and Contract Documents. If this proposal is accepted for award, BIDDERagrees to enter into a Contract with the AGENCYat the unit and/or lump sum prices set forth in the following Proposal Bid Sheet. BIDDER understands that failure to enter into a Contract in the manner and time prescribed will result in forfeiture to AGENCY of the Bid Bond accompanying this proposal.

BIDDERunderstands that a bid is required for the entire work that the estimated quantities set forth in the Proposal Bid Sheet are solely for the purpose of comparing bids, and that ?nal compensation under the Contract will be based upon the actual quantities of work satisfactorily completed. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies In the amounts bid, unit prices shall govern over extended amounts.

BIDDERagrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liabilityfor workman’s compensation or to undertake self-insurance in accordance with the provisions of that code, and that the BIDDER will comply with such provisions of that code before commencing the performance of this Contract if awarded to it.

BIDDERcerti?es that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any Agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

BIDDERdeclares in the attached Non-CollusionAffidavitthat the only persons or parties interested in this proposal as principals are those named therein; that no of?cer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work; and that this proposal is in all respects fair and without collusion or fraud.

BIDDER certi?es that af?rmative action has been taken to seek out and consider disadvantaged business enterprises for those portions of the work to be subcontracted, and that such af?rmative actions have been carefully documented, that said documentationis open to inspection, and that said affirmativeactionwillremainIneffect 10

Page 116 of 624 ends

for the life of any contract awarded hereunder. Furthermore, BIDDERcertifies that affirmative action willbe taken to meet all equal employment opportunity requirements of the Contract Documents.

DATED:W. 2024 BIDDER: ORTCO, INCBY:

TITLE: PRESIDENT- LYNNORTLIEB
BIDDER’SADDRESS: 2163 N. GLASSELL ST. ORANGE, CA 92865
PHONE; (714) 998-3998
11

Page 117 of 624 ends

BIDDER‘SINFORMATION
BIDDERcerti?es that the following information is true and correct:

Bidder's ORTCO, INC.
. Name:

Business Address:
2163 N. GLASSELLST. ORANGE, CA 92865
Telephone: (714) 998-3998
State Contractor's License No. and Class: 557695 / CLASS B Original Date Issued: 10/29/1992 Expiration Date: 10/31/2026 DIR Registration No: 1000001641
The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest In this proposal:

LYNNORTLIEB- PRESIDENT (ZI4)__998—3998
2163 N. GLASSELL ST. ORANGEzCA 92865
GINNYORTLIEB-VICE PRESIDENT 4714) 998-3998
1 N L T. R
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows:

N/A
All current and prior DBA's, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:

N/A
12

Page 118 of 624 ends

CONTRACTOR'SLICENSINGSTATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.

Contractor's License Number: 657695
Name of IndividualContractor (Print or Type):

Signature of Owner:

Business: ORTCO, INC.

Address or Name of Firm: 2163 N. GLASSELLST. ORANGE, CA 92865 2163 N. GLASSELL ST. ORANGE, CA 92865 Business Address:

Name: LYNNORTLIEB Title: PRESIDENT
Address: 2163 N. GLASSELLST. ORANGE, CA 92865
2163 N. GLASSELLST. ORANGE, CA92865
Address or Name of Corporation:

Business Address; 2163 N. GLASSELLST. ORANGE, CA 92865
Corporation organized under the laws of the State of CALIFORNIA Signatu e of President of Corporation
@«A M £3!(iii/£16,ZZTPT/Zi
?lgnaturé of Secretary of Corporati??!
13

Page 119 of 624 ends

SUBCONTRACTORLIST
In compliance with the provisions of the Public Contract Code Section 4104, the undersigned bidder herewith sets forth the name, location of the place of business, and California contractor license of each Subcontractor who will perform work or labor or render service to the Prime Contractor specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and speci?cations, in an amount in excess of one-half (1/2) of one percent (1%) of the General Contractor’s total bid amount or, in the case of bids or offers for the construction of streets or highways, including bridges in excess of one-half of 1 percent (0.5%) of the Prime Contractor‘s total bid or ten thousand dollars ($10,000), whichever is greater, and the portion of the work which willbe done by each Subcontractor.

Name Under Specific
Which Sub Description of % of
Contractor is License DIR Address of Sub Contract Total Licensed Number Number Office Work Bid
N/A
Ifthe bidder fails to specify a Subcontractor for any portion of the work, the bidder agrees to perform the work with his own crews. (Alternative Subcontractors for the same work are prohibited by provisions of the California Government Code.) An inadvertent error in listing the California contractor license number provided pursuant to paragraph (1) shall not be grounds for ?ling a bid protest or grounds for considering the bid nonresponsive ifthe corrected contractor's license number is submitted to the public entity by the prime contractor within 24 hours after the bid opening and provided the corrected contractor's license number corresponds to the submitted name and location for that subcontractor.

NOVEMBER 20, 2024
Dated
7 Signature
14

Page 120 of 624 ends

REFERENCES
The following are the names, addresses, and phone numbers for three public agencies for which BIDDER has performed similar work within the past two years:
1) PRADO PARK- SAN BERNARDINOCOUNTY
GLORIALOOFBOURROW (909) 387-5000 268 W. HOSPITALITYLANESUITE 303 SAN BERNARDINO,CA 92408
2) PACER PARK - CITY OF NORCO
TODD SHANK (951) 212-9427 2870 CLARK AVE. NORCO, CA 92860 3) MLKPARK - CITY OF POMONA
JASON DJAPRI (909) 620—2263 505 S. GAREYAVE. POMONA, CA 91766

DESIGNATIONOF SURETIES
The following are the names, addresses, and phone numbers for all brokers and sureties from whom BIDDERintends to procure insurance and bonds:

SURETY: SURETEC INSURANCECO. (619) 400-4105
3111 CAMINODELRIO N., SUITE 900
SAN DIEGO, CA 92108
BROKER: R S BONDING & INSURANCEAGENCY (714) 541-4700
1633 E. FOURTH ST. SUITE 228
SANTAANA, CA 92701
15

Page 121 of 624 ends

Bond No.1ORTIN—310

CITYOF NORCO

BIDBOND

PIKES PEAK PARK ADA SYNTHETICPOURED-IN-PLACESURFACE PROJECT KNOW ALL MEN BY THESE PRESENT that Ortco, Inc.
, as BIDDER, and
SureTec Insurance Company as
SURETY, are held and firmly bound unto THE CITY OF NORCO, as AGENCY, in the penal sum
of Ten Percent of the Total Amount Bid - dollars ($
10% of Bid ), which is 10 percent of the total amount bid by BIDDERto AGENCY for the above stated project, for the payment of which sum, BIDDERand SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONSOF THIS OBLIGATIONARE SUCH that, whereas BIDDERis about to submit a bid to AGENCY for the above stated project, ifsaid bid is rejected, or ifsaid bid is accepted and a contract is awarded and entered into by BIDDERin the manner and time specified, then this obligation shall be null and void, othenNise it shall remain in full force and effect in favor of AGENCY.

WITNESS our hands this 15th day of November , 2024.
(seal)
Ortco, Inc.

CONTRACTOR
ecretary/Treasurer
NOTE: SIGNATUREOF CORPORATE OFFICIALSMUST BE NOTARIZED.

Subscribed and sworn to before me this day of ,
Seal of Notary:

Notary Public

CASH, CERTIFIEDOR CASHIERSCHECK, OR BIDDERS BOND MUST BE SCANNED OR UPLOADED TO THE PLANET BIDS PORTAL WHEN SUBMITTINGTHE BID/PROPOSAL.

THE SUCCESSFUL BIDDER SHALL PROVIDE THE ORIGINAL BIDDERS BOND DOCUMENTATIONAT TIME OF AWARD.
16

Page 122 of 624 ends

BIDBOND (PAGE 2)
(seal)
.,. ,,\y SURETY’SNAME-TYPE: SureTeclnsurance Com an
Mai?ng Address; 3111 Camino del Rio N., Suite 900
San Diego, CA 92108
By; Matthew R. Dobyns
Name
/"
Signature: /4/Wiyg/
Title: Attorney-in-Fact
NOTE: SIGNATUREOF SURETY MUST BE NOTARIZED:

Subscribed and sworn to before me
this day of ,
Seal of Notary:

Notary Public
17

Page 123 of 624 ends

pom; 510014

JOINTLIMITEDPOWEROFATTORNEY
KNOWALLMENBYTHESEPRESENTS:That SureTec Insurance Company, a Corporation duly organizedand existing under the laws of the State of Texas and having its principalofficein the County of Harris,Texas and Markelinsurance Company (the "Company”),a corporation duly organizedand existing underthe laws of the state of llIinois, and having its principal administrative office in Glen Allen, Virginia, does by these presents make, constitute and appoint:

Randy Spohn, Matthew R. Dobyns, Ashley M. Spohn, HamiltonKenney Their true and lawful agent(s) and attorneylsl—in-fact, each in their separate capacity if more than one is named above, to make, execute, seal and deliver for and on their own behalf, individually as a surety or jointly, as co-sureties, and as their act and deed any and all bonds and other undertaking in suretyship provided, however, that the penal sum of any one such instrument executed hereunder shall not exceed the sum of:

Fifteen Millionand 00/100 Dollars ($15,000,000.00)
This Power of Attorney is granted and is signed and sealed under and by the authority of the following Resolutionsadopted by the Boardof Directorsof SureTec insurance Company and Markelinsurance Company;
"RESOLVED, That the President, any Senior Vice President, Vice President, Assistant Vice President, Secretary, Assistant Secretary, Treasurer or Assistant Treasurer and each of them hereby is authorized to execute powers of attorney, and such authority can be executed by use of facsimile signature, which may be attested or acknowledged by any officer or attorney, of the company, qualifying the attorney or attorneys named in the given power of attorney, to execute in behalf of, and acknowledge as the act and deed of the SureTec insurance Company and Markel insurance Company, as the case may be, all bond undertakings and contracts of suretyship, and to affixthe corporate seal thereto.”
iN WITNESSWHEREOF,Markel insurance Company and SureTec Insurance Company have caused their officialseal to be hereunto af?xed and these presents to be signed by their duly authorized officers on the 2‘ist day of August , 2023 .

SureTeclnsurance Company “Nimitz, .
insurance mpany
o‘i‘s?u- '6‘ ””2 \\ D I 5w?” ”‘2‘:

B: :. ~._ _.-t 8 MichaelC. Keimlg, Presrdent l, i: \o‘ n ice Presrdent ”Himm“
State of Texas County of Harris:

On this 215i day of August , 2023 A. 0., before me, a Notary Publicofthe State ofTexas, in and forthe County of Harris,duly commissionedand qualified, came THE ABOVEOFFICERSor THE COMPANIES, to me personally known to be the individuals and officers describedin, who executed the preceding instrument, and they acknowledged the execution of same, and being by me duly sworn, disposed and said that they are the officers of the said companies aforesaid, and that the seals affixed to the proceeding instrument are the Corporate Seals of said Companies, and the said Corporate Seals and their signatures as officers were duly affixed and subscribedto the said instrument by the authority and direction of the said companies, and that Resolutions adopted by the Board of Directors of said Companies referred to in the preceding instrument is now in force. lNTESTIMONYWHEREOF, I have hereunto set my hand, and affixed my OfficialSeal at the County of Harris, the day and year ?rst above written. 3,. M9 ll/Lc
Commission#12947680-5 .J , E a N
' CommissionExniresMarchQQ,2i326
'5 MC arv. otary Public
JULiEE. MCCLARY
NotaryPublicStateofTexas
y commission expires 3/29/2026
We, the undersigned Officers of SureTec Insurance Company and Markel Insurance Company do herby certify that the original POWEROFATTORNEYof whichthe foregoing is a full,true and correct copy isstillin fullforce and effect and has not been revoked. .» INWITNESSWHEREOF,we have hereunto set our hands, and affixed the Seals of said Companies, on the 15th day of November 2024 .

Company Marital insurance Company
M.Br nt Beaty,A istantSecretary
Any instrument issued in excess of the penalty stated above is totally void and without any validity 510014 For veri?cationofthe authority of this Power you may call(713)812—0800on any business day between 8:30 AM and 5:00 PM CST.

Page 124 of 624 ends

CALIFORNIA ALL-PURPOSEACKNOWLEDGMENT
A notary public or other of?cer completing this certi?cate veri?es only the identity of the individual Who signed the document to which this certi?cate is attached, and not the truthfulness, accuracy, or validity of that document.
'
State of CALIFORNIA
County of ORANGE
On \ \ \9 before me, ERIKAG. MORGANINOTARY PUBLIC,
personally appeared MATI'HEW R. DOBYNS
? who proved to me on the basis of satisfactory evidence to be the personfs§ whose nameés) is/aresubscribed to the within instrument and acknowledged to me that hefshefthey executed the same in hisfhenLtheir authorizedcapacity Get», and that by hisfherftheirsignatureés) on the instrument the personés), or the entity upon behalf of which the person€5§ acted, executedthe instrument.

W > I certify under PENALTYOF PERJURYunder the laws of the State of ERIKAe. MORGAN California that the foregoing paragraph is true and correct.

COMM.#2354018
\ WITNES my hand and official seal.
' nature otary
‘ NOTARYPUBLlC-CALlFORNlA E

OPTIONAL
. ORANGECOUNTY
Comm. Expires May 5, 2025
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF A'ITACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER
— PARTNER(S) El LIMITED
3 A1TORNEY-IN-FACT
_ TRUSTEE(S)

I GUARDIAN/CONSERVATOR
OTHER:

SIGNER IS REPRESENTING:

NAMEOF PERSON(S) OR ENTITY(IES)

Page 125 of 624 ends

CALIFORNIAALL-PURPOSEACKNOWLEDGMENT
A notary public or other of?cer completing this certi?cate veri?es only the identity of the individual who signed the document to which this certi?cate is attached, and not the truthfulness, accuracy, or validity of that document.

State of CALIFORNIA
County of ORANGE
On November 18th 2024 before me, HAMILTONKENNEYINOTARYPUBLIC, personally appeared LYNN ORTLIEB ,
? who proved to me on the basis of satisfactory evidence to be the personés) whose nameés) is/aresubscribedto the withininstrument and acknowledged to me that he/shefthey executed the same in hisfhe?itheir authorizedcapacity {Fee},and that by hleHEELEHEi-F signaturefs) on the instrument the personésy, or the entity upon behalf of which the personés) acted, executed the instrument.

I certify under PENALTYOF PERJURYunder the laws of the State of California that the foregoing paragraph is true and correct. 4 COMM.#2362677 ? WITNESS my hand and official seal.

NOTARYPUBLlC—CALiFORNiA0
ORANGECOUNTY .3.
‘ a? 1
t OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

Z CORPORATE OFFICER

PRESIDENT TREASURER
:1 PARTNER(S) El LIMITED

ATI'ORNEY-IN-FACT

TRUSTEE(S)
GUARDIAN[CONSERVATOR
OTHER:

SIGNER IS REPRESENTING:

NAME OF PERSON(S) OR ENTITY(IES)
ORTCO INC.

Page 126 of 624 ends

NON-COLLUSIONDECLARATION
(TO BE EXECUTEDBYBIDDERANDSUBMITTEDWITHBID)
The undersigned declares:
i am the PRESIDENT of ORTCO, INC. , the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosedperson, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, orto fixany overhead, pro?t, or cost element ofthe bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has fullpower to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 11/20/24 [date], at ORANGE [city], CALIFORNIA [state].
18

Page 127 of 624 ends

CITYOF NORCO

PROPOSAL BIDSHEET

PIKES PEAK PARK ADA SYNTHETICPOURED-IN-PLACESURFACE PROJECT

ITEM QUANTITY UNIT DESCRIPTIONOF ITEMS
UNIT

PRICE IN

FIGURES
TOTAL
L.S. Mobilization& NPDES/BMPS $ 13,500.00 $
13,500.00
E.A.

Provide and Install Project
Sign and post for Community
Development Block Grant
Projects. Exhibit8—3of
Special Federal Provisions
5 1,000.00 $ 1,000.00
LS.

Provide and Install Temporary
Secured Construction
Fencing with Privacy Screen
for the Perimeter of Both
Playground Areas for the
Duration of Project
$ 5,000.00 $ 5,000.00
L.S. Remove and Dispose of
Existing Fibar Woodchips as
shown ExhibitA.
$ 41,600.00 $ 41,600.00
E.A. Remove and Dispose of
Existing Concrete Ramps
$ 3,000.00 $ 6,000.00
L.S.

Remove and Dispose of the
Existing Playground
Structures shown in ExhibitA.
$ 20,000.00 $ 20,000.00
L.S. Remove and Dispose of the
Existing Subbase Materials
shown in ExhibitA.
$ 2,000.00 $2,000.00
LS.

Adjust and Clear
Drainage Inlets for
Playground Areas
Required by the
Superintendent
Existing
Both
As
Parks
$ 3,000.00
19 $ 3,000.00

Page 128 of 624 ends

ITEM QUANTITY UNIT DESCRIPTIONOF ITEMS
UNIT

PRICE IN

FIGURES
TOTAL
LS.

Installationof Subbase as per
the FlexGround Standard or
Approved Equal
$ 34,700.00 $ 34,700.00

10. L.S.

Installation of Poured In Place
Safety Surfacing as per the
FlexGround Standard or
Approved Equal. Playground
PIP Design and SF color
quantities shown in Exhibit B
$319,300.00 $ 319,300.00

11. L.S. Five (5) Year Warranty $ 5,000.00 $5,000.00

12. L.S.

TOTAL BIDAMOUNT
$
Administrationand
Completion of a Demolition
Deposit] Disposal of All
Materialswith Documentation
456,100.00
$ 5,000.00 $ 5,000.00
$ 456,100.00

TOTAL BID AMOUNTINWORDS
four hundred fifty six thousand, one hundred dollars
NOTE:

ORTCO, INC.
(714) 998—3998
Bidders Name and Telephone Number
The unit price must be written in words and also shown in figures. The total price must be extended for each item of work, and the total of all items inserted in the space provided.
20

Page 129 of 624 ends

PROPOSAL
IN WITNESS WHEREOF, BIDDERexecutes and submits this proposal with the names, titles, hands, and seals of all forenamed principals this l3“ day of NOVEMBER,2024 . a BIDDERORTCO,INC.
21763N. GLASS L RANGE, CA 92865

LYNN ORTLIEB - PRESIDENT
Subscribed and sworn to this day of

NOTARY PUBLIC
By
Title
AGENCY acknowledges that this proposal was received and opened at the time and in the place specified, and that itwas accompanied by the required guarantee in the amount of 10 percent of the total bid.

BY
Title
21

Page 130 of 624 ends

CALIFORNIAALL-PURPOSEACKNOWLEDGMENT
A notary public or other of?cer completing this certi?cate veri?es only the identity of the individual Who signed the document to which this certi?cate is attached, and not the truthfulness, accuracy, or validity of that document.

State of CALIFORNIA
County of ORANGE
On November 18th 2024
‘ before meI HAMILTONKENNEYl NOTARYPUBLIC,
personally appeared LYNNORTLIEB ,
E who proved to me on the basis of satisfactory evidence to be the person(s) whose name{s§ is/aresubscribed to the within instrument and acknowledged to me that he/shefthey executed the same in hisfhe?Lt-heir authorized capacity Gee), and that by his7L|=ier+ti=iei1= signaturefsa on the instrument the personfsi or the entity upon behalf of which the personés} acted, executed the instrument.

I certify under PENALTYOF PERJURYunder the laws of the State of California that the foregoing paragraph is true and correct. i
3 5‘ HAMILTONKENNEYl
COMM.#2362677 F“ WITNESS my hand and official seal.
~ -l
‘ NOTARYPUBLIC-CALIFORNlAO ORANGECOUNTY —-1 MYCOMM,ExpiresJune25,2025 0 Signature of awry
* .
‘ I
‘ OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT _ INDIVIDUAL

X CORPORATE OFFICER

PRESIDENT
PARTNER(S) El LIMITED
_ ATTORN EY-IN-FACT

Q TRUSTEE(S)
_ GUARDIAN[CONSERVATOR
OTHER:

SIGNER IS REPRESENTING:

NAME or PERSON(S) OR ENTITY(IES)
ORTCO, INC.

Page 131 of 624 ends

EXHIBIT B—2

FEDERALPREVAILINGWAGE DECISION
(CA mod. )
Insert most recent (10 days prior to bid opening) wage decision at this point.

LABORSTANDARDSREQUIREMENTS - PRECONSTRUCTIONPHASE.A construction project covered by Federal LaborStandards Provisions (HUD-4010) requires a series of specific actions prior to the actual start of construction. Those actions are:
a. obtaining an applicable Davis-Bacon wage determination for the project; b. including that wage determination (and any modifications) in the bid documents where there is competitive bidding or in invitations for proposals; and c. including appropriate labor standards provisions and the wage determination in the construction contract.

CONSTRUCTION WAGE DETERMINATION — DEFINITION.All construction bid documents and contracts, or analogous instruments covered by the Federal Labor Standards Provisions (HUD— 4010) ms; contain a current and applicable wage determination issued by the Department of Labor. The term ”wage determination” includes the original decision and any subsequent decisions modifying, superseding, correcting, or otherwise changing the provisions of the original decision.

Reference: Handbook1344.1 FederalLaborStandardsCompliance in Housing and Community Development Programs'; paragraph 2-1, section 1 paragraph 1-1.

OBTAININGWAGE DETERMINATIONS
The RiversideCounty Department of Housing & Workforce Solutions (HWS)will be responsible to obtain and provide the appropriate Federal wage determination from the US. Department of Labor (DOL)for this project. The appropriate wage determination willbe the most current determination, applicable for RiversideCounty and the construction type, that is effective ten (10) days before the opening of bids. Wage determinations shall be effective (locked-in) on the date that bids are opened provided that the contract is awarded within 90 days after bid opening. Ifthe contract is awarded more than 90 days after bid opening, the wage determination shall be updated as of the date of award. If construction starts more than 90 days after contract award, the wage determination shall be updated as of the construction start date.

Page 132 of 624 ends

GROUP3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This
category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all
related machinery and equipment
LABOllS4-962 97/01/2022
Rates Fringes

LABORER(TUNNEL)
GROUP 1 .............................................. $ 45.68 23.30 GROUP 2 .............................................. $ 46.06 23.30 GROUP $ 46.46 23. 36
GROUP 4 .............................................. $ 47.15 23.36

LABORER
GROUP 36.39 21.04
GROUP 36.94 21.64
GROUP 37.49 21.64
GROUP 39.04 21.94
GROUP 39.39 21.64
138

Page 133 of 624 ends

(pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak—it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay—kold,
creosote, lime caustic and similar type materials
("“applying“" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Nacker and similar type; Trenching machine, hand—propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand—guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 76 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal

TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.) GROUP 2: Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, p tic
tools (except driller); Bull gang mucker, tragiagirson; Concrete crew, including rodder and spreader

Page 134 of 624 ends

EXHIBIT B-4
Required Bid Form

CERTIFICATION OF BIDDER

REGARDING NONSEGREGATED FACILITIES
Project Name; PIKES PEAK PARK ADA SYNTHETICPOURED-IN—PLACESURFACE Name of Bidder: ORTCO, INCThe above—namedBidder hereby certifiesthat:

I do not maintain or provide for my employees any segregated facilities at any of my establishments, and that I do not permit my employees to perform their services at any location, under my control, where segregated facilities are maintained. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, wash rooms, restaurants and other eating areas, time clocks, locker rooms or other dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, national origin, or because of habits, local customs, or otherwise.

Ifurther agree to obtain identical certifications from all proposed subcontractors prior to the award of subcontracts excee
'
Signature:

Name (print): LYNNORTLIEB
Title: PRESIDENT
Date: 11/20/2024

Page 135 of 624 ends

W
Required Bid Form
Section 3 Project Implementation Plan
GeneralSubmittalInstructions:

BidderzProposer ANDits first—tiersubcontractors are to submit a completed Section 3 Implementation Plan(s) in bid. If not, A "non-responsive” determination may be made clueto non-submittal.

Project Information:

Project Name: Bid/Solicitation #: 4407 8
PIKES PEAKADA SYNTHETICPOURED—lN—PLACE
' @ContractorElSubcontractor Information
Company Name: Address:

ORTCO, INC. 2163 N. GLASSELLST. ORANGE, CA 92865
AuthorizedRepresentative: Title:

LYNN ORTLIEB PRESIDENT
Phone: (714)998-3998 Ema“: [email protected]
Proposed DollarValue of Contract or Subcontract? L‘Bio,‘00_ 00 Listif ELBE,DBE,DVBE,MBE, SB,SLBEor WBE (or "N/A”if non-applicable): N/A Section 3 Reguirements
Employment and Training
To the greatest extent feasible, employment and training opportunities arising in connection with Section 3 projects shall be provided to Section 3 workers within the County of Riverside. Where feasible, priority for employment and training will be given to:

1. Section 3 workers residing within the service area or neighborhood of the project, and

2. Participants in YouthBuildprograms.

Contracting
To the greatest extent feasible, work contracts awarded in connection with Section 3 projects shall be provided to business concerns that provide economic opportunities to Section 3 workers residing within the County of Riverside. Where feasible, priority for contracting opportunities will be given to:

1. Section 3 business concerns that provide economic opportunities to Section 3 workers residing within the service area or the neighborhood of the project, and

2. YouthBuild programs.

Compliance Benchmarks
To demonstrate compliance with Section 3, contractors are required to follow the prioritization of effort outlined above and meet or exceed the following safe harbor benchmarks:

1. 25 percent or more of the total number of labor hours worked by all workers on the project shall be performed by Section 3 workers, and

2. 5 percent or more of the total number of labor hours worked by all workers on the project shall be performed by Targeted Section 3 workers.

Definitions
0 Section 3 worker: Any worker who currently fits or when hired within the past three years fits at least one ofthe following categories, as documented:
(1) The worker’sincome for the previous or annualized calendar year is below the income 1

Page 136 of 624 ends

EXHIBIT B—6
1Continued )
Section 3 Project Implementation Plan
If ”YES,”at a minimum, you must contact the HWS Section 3 Unit at RivCoCDBGQrivcoorgto obtain examples of qualitative efforts to create employment.

4. Do you agree that when there is a need to hire new employees, a documented good faith effort shall be made to hire Section 3 Workers? YESI: NO Implementation Plans that indicate a ”No” response for Question#4 may be deemed "nonresponsive.”

5. How many workers are needed to complete the project? Please list the job classifications and number of workers your company will need to complete the contract work. Attach additionalsheets if necessary.

Job classification
(Office/Clerical,Manager, Engineer,
Technician, Supervisor]Foreman,
Total estimated Number of Estimated
number of workers in current number of
Electrician, Plumber, Laborer, Trainee, workers "EEdEd workforce additional Security, etc.)
workers needed
ADMIN/OFFICE 2 2 0
SUPERVISOR 1 1 O
LABORERS/RESIUANTFLOORlNG 5
4 40 O
4 _______________________ L

Page 137 of 624 ends

(2) The worker is employed by a Section 3 business concern. (3) The worker is a YouthBuildparticipant.

Section 3 Project Implementation Plan
limit established by HUD (see Income Limitstable below). 0 Targeted Section 3 worker: A Section 3 worker who is:
(1) Aworker employed by a Section 3 business concern; or EXHIBIT B—6
(Continued)
(2) A worker who currently fits or when hired within the past three years ?t at least one of the following categories, as documented:
(i) Living within the service area or the neighborhood of the project; or (ii) A YouthBuild participant.
- Service area or the neighborhood of the project: An area within one mile of the Section 3 project or, iffewer than 5,000 people live within one mile of a Section 3 project, within a circle centered on the Section 3 project that is sufficient to encompass a population of 5,000 people according to the most recent U.S. Census.

HUDIncome Limits
The table below shows the income limits set by HUD that determine eligibility for certain programs, including Section 3. HUDdevelops income limits based on Area Median Income (AMI)estimates and Fair Market Rent (FMR) area definitions. For more information, please see the HUD Income Limits Documentation System online at www.huduseLgovlportal/datasets?l.html.

Riverside County, CA MSA
Fiscal Year 2023 2022 2021
Low-income
(80% AMI) $52,000 $49,300 44,250

1. Does your business qualify as a Section 3 business concern? D YESEZINO If you answered YES,complete the attached Section 3 Business Concern Form (Pg. 6), and submit with this Plan.

A Section 3 business concern is a business that satisfies at least one of the following criteria, as documented within the last six-month period:
a. The business is at least 51% owned and controlled by low—or very low-income persons; b. The business is at least 51% owned and controlled by residents who currently live in public housing or Section 8—assistedhousing; or
c. Over 75% of the labor hours performed for the business over the prior three-month period were performed by Section 3 workers —— i.e., workers who currently are, or when hired within the past three years were:
(i) low—incomepersons or
(ii)YouthBuildparticipants.

2. Do you have current employees whose annual income is belowthe income limit? See HUD Income Limits table. [I was NO
If “YES,”prior to contract execution, the names of qualifying employees shall be provided to HWS.

3. Do you plan to hire new employees to perform on or support the contract, if awarded the contract? (3 was.NO

Page 138 of 624 ends

w
jContinuedl
Section 3 Project Implementation Plan

8. Will you be using subcontractors on this project? [:I YESMNO If "Yes", Bidder/Proposer is required, to the greatest extent feasible, to outreach to and award subcontracts to Section 3 Business Concerns. AT A MINIMUM YOU MUST CONTACTTHE HWS SECTION?/EOCUNITAT RivCoCDBGgQrivcoorgOR GOTO https:[[rivcoeda.orgZDepartments [Housingz Communi_t_y-Development-BIockGrant[CommunityDeveIopment [Sections—Program TO OBTAIN"Examples of Effortsto Create Employment and Contracting Opportunities." Section 3 Business Concerns must complete the Section 3 Business Concern Form and must be certified by HWS. For ELBE,SLBE,SB, DBE, MBE, WBEor DVBEfirms, please attach a copy of their certification(s). ListALLproposed subcontractors (including subconsultants) for this project on the table below.

S 'o 3 . Scope of work (trade or highenss? Estimated contract servrcedescription) Yes / No
Business name value
N/A N/A N/A $ N/A
s
$
L

4. Do you commit to engage in good faith efforts to meet or exceed the Section 3 Benchmarks? YES[J NO
Such qualitative efforts may include, but are not limited to:
0 Applicant Outreach —
- Engage in outreach efforts to generate job applicants who are Targeted Section 3 workers, includingpostingjob openings at the job site, HUDOpportunity Portal, socialmedia pages, and other platforms.

Page 139 of 624 ends

w
Lemme)
Section 3 Project Implementation Plan
- Clearly indicate Section 3 eligibilityon alljob postings, notifications, and advertisements with the following statement: ”This is a Section 3 eligible job opportunity. We encourage applications from individualsthat are low—income, live in public housing, and/orreceive a Section 8 voucher.”
- include the Section 3 Worker Self-Certi?cationform in alljob postings.

One—StquYouthBuildOutreach- Engage in outreachor referralswith localYouthBuildprograms, or other community organizations to assist with training and recruiting Section 3 and Targeted Section 3 workers.

Training and Apprenticeship — Provide training or apprenticeship opportunities.

Job Fairs — Hold one or more job fairs or sponsor a job informationalmeeting in the project area.

Business Concern Outreach —
- Engage in outreach efforts to identify and secure bids from Section 3 businesses by advertising notices of contracting opportunities and related information in local community papers.
- Provide written notice to all known Section 3 business concerns, with sufficient time for interested businesses to respond to bid invitations.
- Send notice of contracting opportunities to local community development organizations, business development organizations, or minority contracting associations. - State clearly in all notices that the contracting opportunity is Section 3 eligible and include a copy of the Section 3 Business Concern Certification form.

Competition Assistance — Provide technical assistance to help Section 3 business concerns understand and bid on contracts.

Contract Sizing — Size, split, or divide contracts into smaller jobs to facilitate participation by Section 3 business concerns, particularly where economies of scale or efficiency of delivery are not factors. [2 CFR200.321(b)(3)]
Bidder Viability Support — Provide bonding assistance, guaranties, or other efforts to support viable bids from Section 3 business concerns.

Business Registries — Promote the use of business registries designed to create opportunities for disadvantaged and small businesses.

Additionalactivities and efforts aimed at increasing economic opportunities for Section 3 workers and businesses may include, but are not limited to:

Employment Assistance — Provide technical assistance to help Section 3 workers compete forjobs, or connect them with assistance in seeking employment, including resume assistance, interview preparation, coaching, orjob placement services.

Work Readiness and Retention - Provide or refer Section 3 workers to services supporting work readiness and retention, such as interview clothing, licensing or testing fees, transportation, or childcare.

Financial Literacy— Help Section 3 workers obtain financial literacy training or coaching.

Education Assistance — Assist Section 3 workers to apply for or attend community college, fouryear educational institution, or vocational/technical training.

5. Do you commit to prioritize your efforts in hiring, training, and contracting as required by the Section 3 regulations and outlined on page 1 of this Plan? MYES NO

Page 140 of 624 ends

SECTION3 BUSINESSCONCERNFORM
Please complete this form to determine if your business may qualify as a Section 3 Business. Businesses that qualify will be contacted by HWS Section 3 Coordinator to complete a Section 3 Business Application and asked to provide additional documentation to verify their status as a Section 3 Business.

What is Section 3?
Section 3 is a provision ofthe Housing and UrbanDevelopment Actof 1968 (24CFRPart 75)that requires recipients of certain HUD ?nancial assistance, to the greatest extent possible, to provide job training, employment, and contract opportunities for low—or very low-income residents in connection with projects and activities in their neighborhood.

A business can Qualifyas Section 3 if it meets one of the following criteria:

A. It is at least 51% owned and controlled by low—or very low-income persons; B. Over 75% of the labor hours performed for the business over the past three—monthperiod were performed by workers who met at least one of the criteria below; or C. It is at least 51% owned and controlled by current public housing residents or residents who currently live in Section 8—assistedhousing.

Workers must meet one of the following criteria for a business to guali? as Section 3 under item Babove:
- Reside within one mile of the Section 3 project (or, if fewer than 5,000 people live within one mile of the Section 3 project, within a circle centered on the Section 3 project that is sufficient to encompass a population of 5,000 people according to the most recent US. Census); 0 Be a HUD YouthBuild participant; or
0 income for the previous or annualized calendar year is below 80% of the current area median income for the area in which the worker resides. (Use the worker’s annual gross income based on AMI for a singleperson household.) HUDincome limits can be found at httpsi/wwwhudusengovzportaydatasets/ilhtml.) Company NameZORTCO, INC.

Contact Person: LYNNORTLIEB
fddress=2163 N. GLASSELLST.

City: ORANGE State: CA Zip: 92883
Phone: (714)998-3998 Email: [email protected]
- 11/20/2024
Signature .,' -usinessOwner Date

Page 141 of 624 ends

w
Required Bid Form
Certification for Section 3 Compliance
{Reguired for Bidder and all Subcontractors)
Project Information: 1 Project Name: PIKES PEAKADASYNTHETICPOURED-IN—PLACE Bid/Solicitation #1 LILIQ’I .X Contractor/Subcontractor Information:
companyN : Add : ame ORTCO, INC.
ress
2163 N. GLASSELLST. ORANGE, CA 92865
A th ‘ d R t t' : T'tIe: ” me eprese” a “’8 LYNNORTLIEB ' PRESIDENT
P : me E 'I:
(714) 998-3998
ma' [email protected]
IV.

VI.

VII.

By completing and signing this form, I agree to comply with all applicable requirements of Section 3 of the Housing and Urban Development Act of 1968 (24 CFRPart 75) and HWS’Section 3 requirements.

I understand that "to the greatest extent feasible," work contracts awarded in connection

INITIALHEREM
with Section 3
projects shall be provided to business concernsthat provide economic opportunities to Section 3 w rkers following the prioritization efforts outlined in Section 3 regulation. / "

INITIALHERE
I understand that in the event any new employment opportunities are created as a result 0 is CDBGfunded project then "to the greatest extent feasible” employment and training opportunities shall be provided to Section 3 workers following the prioritization efforts outlined in Section 3 regulation.

INITIALHEREM
I understandthe safe harbor benchmarksfor Section 3 compliance and that ifthese benchmarks are not met the contractor will be required to report on the qualitative efforts made to meet the benchmgr ks.

INITIALHERE
I understand that Iwill be required to make good faith assessments of employee labor hours on Section 3 covered projects and submit quarterly and final Section 3 reports and supporting documentation. '

INITIALHERE
I understand that any and all sub—contracts and sub—tieragreements resulting from this CDBG-funded project are also subject to Section 3 compliance and that it will be the General/PrimeContractor’s responsibility to ensure compliance from all subcontractors.

INITIALHERE
%
anct as, I understand that noncompliance with HUD's regulations in 24 CFR Part 75 may result in s termination of contract for default, and debarment or suspension from future HUD-assistedcontra ?

INITIALHERE
I declare that allstatements contained in this form and any accompanying documents are true and correct and made with full knowledge that all statements given are subject to investigation and that any false or dishonest answer to any question may be grounds for denial or revocation offunding or other penalties as prescribedunder 18 US. Code § 1001.

LYNNORTLIEB QRTCQ’|NC_
Name of President or AuthorizedOfficer Company Name
‘ 11/20/2024
Signature Date ‘

Page 142 of 624 ends

we
J .. , ( Required Bid Form
HWS

BIDDERCERTIFICATIONON

FEDERALCONTRACTREQUIREMENTS
Project NaFl:TliKeE:S PEAKPARK ADA SYNTHETICPOURED-INPLAIgTE/Solicitatbn #2 “H“A‘ 8 CERTIFICATION:

I hereby certify that I have reviewed and understand the diversified Federal construction contract— related requirements imposed on the Contractor(s) of HUD-fundedconstruction projects, including but not limited to the following:

1. The subject project is being financed with Community Development BlockGrant funds (24 CFR Part 570); and

2. This project and all related construction contracts are subject to the US. Department of Housing and Urban Development’s Federal Labor Standards Provisions (HUD4010 — revised 10/2023); and

3. This project is subject to all applicable laws and regulations as listed in the General Summary of these Special FederalProvisions; and

4. If my bid is $200,000 or more, this project and all related contracts will be subject to Section 3 requirements (12 U.S.C.1701u); and

5. If the project is $250,000 or more, this project and all related contracts will be subject to comply with the requirements ofthe BuildAmerica, Buy America (BABA)Act (41 USC8301).

CONTRACTOR’SNAME: ORTCQ 'NC‘
CONTRACTOR’S LICENSENO.: 557695
ADDRESS: 2163 N. GLASSELL ST. ORANGE, CA 92865
AUTHORIZED REPRESENTATIVE:
7 14' '
'
. f
'rint Name)
SIGNATURE:

DATE: 11/20/2024

Page 143 of 624 ends

w
Required Bid Form

QUESTIONNAIRE REGARDINGBIDDERS
Bidder has been engaged in the contracting business under the present name of ORTCO, INC. , since 1992 (Date).
pregent business address is: 2163 N. GLASSELLST. ORANGE, CA 92865 FederalTax ID: 3343494554 Amount of Bids LIB-It), I00 . W California Contractor's License No.: 657695 Expiration Date: 10/31/2026 UEI Number: N/A or CAGECode: N/A
Because this project is Federally funded, it is necessary to obtain information concerning minority and other group participation for statistical purposes. The U.S. Department of Housing and Urban Development (HUD) uses this information to determine the degree to which its programs are being utilized by minority business enterprises and targeted group contractors.

A minority enterprise is defined by the Federal Government as a business that is fifty—one percent (51%) or more ”minority-owned”. Please check the applicable box concerning the ownership of your business:

American Indian or Native Alaskan
Asian or Pacific Islander/NativeHawaiian
Black/AfricanAmerican
Hispanic
White
HasidicJews
Other
A woman—ownedenterprise is defined by the Federal Government as a business that isfifty-one percent (51%) or more woman-owned. Please check applicable box concerning the ownership of your business:
[I Woman/Femaleowned EZ Male owned
A Section 3 Contractor or Subcontractor is a business concern that is more than fifty—onepercent (51%) owned by a low or very low—incomeperson, or over 75 percent of the labor hours performed for the business over the prior three-month period are performed by Section 3 workers. Please check the applicable box concerning the ownership of your business:

El Section 3 Business concern Z Non-Section 3 Business concern The United States Department of Housing and Urban Development (HUD) is authorized to solicit the information requested in this form by virtue of Title 12, United States Code, Section 1701 et seq., and other regulations. It will not be disclosed or released outside of HUDwithout your consent, except as required or permitted by law.

Page 144 of 624 ends

EXHIBIT B—10
Required Bid Form

LISTOF SUBCONTRACTORS
SUBCONTRACTOR FED.I.D.# AMOUNT ADDRESS/PHONENO.

N/A

SUPPLIERS I
NAME OF SUPPLIER ADDRESS/PHONENO. CONTRACTAMOUNT
FLEXGROUND 2140 EAST CEDAR ST. TEMPE, AZ 85281 $230,000.00 (888) 571 -1080
If the project is $250, 000 or more, this project and all related contracts willbe subject to comply with the requirements of the Build America, BuyAmerica (BABA) Act (4 7 USC830 7).

This form is to be completed and submitted with the bid package.

Page 145 of 624 ends

att aci?ctideconstruction.com
ed oldman'd aci?ctideconstruction.
ed oldman'd wwuteam.com com

SENT REGULARANDELECTRONIC

CITY OF
1[ORCO

HORSETOWN USA
WyattW.Undenivood
EdwardGoldman
Paci?cTideConstruction
19630RinaldiStreet — 150
Northridge,CA91326
DearMr.Undenrvoodand Mr.Goldman,
Followingyourfollow-uplettersregardingtheCity'sterminationofyourcontractforcause and for convenience,thisletterservesto formallyconfirmtheCity’sterminationofthe PikesPeakParkADA SyntheticPoured-ln-PlaceSurfacingProjectAgreement.

Youreceiveda noticeofterminationon October25, 2024,fromourattorneyon behalfofthe Cityand myself,the DirectorofFacilitiesand Maintenance.Please continueto considerthisletteras formaland officialtermination.

Thankyouforyourattentiontothismatter
anda Hamilto, DirectorofFacilitiesand Maintenan
Cc:Vanessa Lassooy,Harper&Burns,LL

FACILITIES&MAINTENANCEDEPARTMENT
2870CIarkAvenue,Norco,CA92860 0 (951)270-5632 0 [email protected] - vwvw.norco.ca.us/ Sincerel
October30,202

Page 146 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.E.

To: Honorable Mayor and City Council Members
From: Amanda Hamilton, Facilities and Maintenance
Director
Prepared By: Amanda Hamilton, Facilities and Maintenance Director
Department: Facilities and Maintenance
SUBJECT:

Accept Proposal and Award Camera System and Wi-Fi Improvements for the Ingalls Event Center Camera System Project (Project No. 54410.10) RECOMMENDATION:

Accept proposal and award contract to SHI International Corporation (through OMNIA Partners Contract No. 2024056) in the amount of $179,000 for the Ingalls Event Center Camera System Project.

SUMMARY:

The Ingalls Event Center Camera System Project (Project No. 54410.10) has been approved as a Capital Improvement Project for Fiscal Year 2024-25. The Ingalls Event Center, a key venue for family-friendly entertainment, requires upgrades to its security and Wi-Fi infrastructure to support events at the Center. Currently, the facility lacks a comprehensive camera system and has inadequate Wi-Fi to handle event needs. The proposed contract with SHI International Corporation aims to address these deficiencies by installing a camera system and upgrading the Wi-Fi network to improve security, customer experience, and operational efficiency. The upgrades will provide full perimeter camera coverage and robust Wi-Fi, ensuring the facility meets growing demands and maintains its role as a premier venue.

BACKGROUND:

To safeguard the integrity of the City’s security and Wi-Fi systems, this staff report has been intentionally generalized. In accordance with established security protocols and to mitigate the risk of compromising the City's IT and security infrastructure, all information related to security software, system configurations, and related technologies will remain confidential and shall not be disclosed to the public. Unauthorized disclosure of such

Page 147 of 624 ends

sensitive details could expose the City to heightened security vulnerabilities and potential threats from malicious actors.

The Ingalls Event Center is a key facility in the City of Norco, known for offering familyfriendly entertainment to the community. The Center hosts a diverse range of events, including rodeos, equestrian activities, community events, and more. It features two primary covered arenas—Moreno Arena and Clark Arena—which are regularly used for large-scale events. As a cornerstone of family-oriented entertainment in Norco, the Ingalls Event Center serves an essential role in maintaining the equestrian lifestyle while ensuring the safety and enjoyment of visitors. In order to meet the growing demands for security, customer service, and operational efficiency, the facility requires an upgrade to its existing security infrastructure and Wi-Fi capabilities.

Currently, the facility lacks a comprehensive, perimeter-wide camera system, and the existing Wi-Fi infrastructure is insufficient to support the operational needs of largescale events. The proposed contract with SHI International Corporation will address these deficiencies by procuring and installing a complete camera system and upgrading the Wi-Fi network, both of which will improve event security, customer experience, and overall facility management.

Project Scope: The proposed project will encompass the following components:

Procurement and Installation of a Camera System:
 SHI International Corporation will be responsible for procuring and installing a complete camera system to cover both the interior and exterior areas of the Moreno and Clark Arenas.
 The cameras will be strategically positioned to provide full perimeter coverage, ensuring a 360-degree view of both the exterior and interior of the arenas during events.
 The installation will include all necessary equipment, including cameras, mounts, cabling, and related hardware to ensure full functionality.  The camera system will be designed to support real-time monitoring of largescale events.  The contract will cover all associated costs for the system's operation, including software, licensing, storage, and other essential components.

Procurement and Installation of Wi-Fi Infrastructure:
 SHI International Corporation will also be responsible for upgrading the Wi-Fi infrastructure at the Ingalls Event Center.
 This upgrade will ensure the facility’s network can handle the increased bandwidth required for the camera system and provide reliable internet service for customers and event participants.
 The contract will cover all associated costs for the Wi-Fi upgrade, including equipment, installation, and licensing.

The cameras will be installed in designated public areas where individuals have no reasonable expectation of privacy, in compliance with applicable laws and regulations.

The contract with SHI, facilitated through Omnia Partners, a global procurement organization, and identified as Contract No. 2024056 via cooperative purchasing,

Page 148 of 624 ends

complies with the City’s procurement requirements. The approval of this contract with SHI International Corporation will significantly enhance both the security and functionality of the Ingalls Event Center. The installation of a comprehensive camera system and the improvement of the Wi-Fi network are critical steps in ensuring the safety and success of large-scale events, while also providing an improved experience for event attendees and clients. These upgrades are vital for maintaining the facility’s standing as a premier venue for family-friendly entertainment in the City of Norco. Staff respectfully recommends that the City Council approve this contract to proceed with the implementation of the project.

FISCAL IMPACT:

The Ingalls Event Center Camera System Project (Project No. 54410.10) was approved as a Capital Improvement Project (CIP) for Fiscal Year 2024-25 for total project amount of $300,000 from Measure R Account No. 132.940.43115. The available funds in this account are fully adequate to cover the cost in the amount of $179,000 for the Ingalls Event Center Camera System and Wi-Fi Improvement Project.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction No. 5 Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Daphne Liu, Finance Director Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney

Page 149 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.F.

To: Honorable Mayor and City Council Members
From: Amanda Hamilton, Facilities and Maintenance
Director
Prepared By: Amanda Hamilton, Facilities and Maintenance Director
Department: Facilities and Maintenance
SUBJECT:

Approval for the Installation of a Round Pen at Basin Park (3015 Dapplegray Lane, Norco, CA 92860)
RECOMMENDATION:

Approve the installation of a round pen at Basin Park.

SUMMARY:

In November 2024, the City received a proposal to install a round pen at Basin Park to provide local horse owners with a safe, dedicated space to warm up and lunge their horses before using the main arena. The proposal was presented to the Parks and Recreation Commission, which acknowledged the round pen’s value to the community.

Alisha Hajek and So Cal Fence will generously donate the round pen, which will be installed by City staff with assistance from Parks and Ingalls Crews. Ongoing maintenance will be minimal, as Priority Landscape, which already maintains the arena, will also care for the round pen. The installation and maintenance costs will be absorbed within the existing park operating budget.

BACKGROUND:

In November 2024, the City received a proposal from Alisha Hajek to install a round pen at Basin Park located at 3015 Dapplegray Lane. This round pen will provide a dedicated area for local horse owners to lunge and warm up their horses before utilizing the main arena. The proposal directly addresses a community need, as local equestrians have expressed interest in having a safe and accessible space to warm up their horses.

A round pen is a circular enclosure designed to offer a controlled, safe environment for exercising horses. It allows horse owners and trainers to work with their horses in a confined space, fostering trust, communication, and control. The round pen is typically

Page 150 of 624 ends

used for lunging, a form of exercise where the horse moves in a circle, guided by the handler. This exercise helps the horse stretch, warm up, and release excess energy, making the round pen an essential tool for preparing horses for arena activities.

The proposal was presented to the Parks and Recreation Commission on December 9, 2024. The Commission recognized the round pen as a valuable addition to Basin Park and acknowledged its potential to enhance the experience of local equestrians.

In accordance with the City’s Donations Acceptance Policy and Procedures, all donations, including those offered to employees, must be submitted for review. City staff will evaluate each donation to determine whether its benefits warrant acceptance. For donations of cash or tangible goods valued at $24,999 or less, the City Manager or their designee is authorized to accept the donation. The City Manager or designee is also responsible for acknowledging receipt and expressing gratitude to the donors on behalf of the City. So Cal Fence and Alisha Hajek have generously offered the donation of a round pen in the amount of $3,000. This donation falls within the accepted threshold, and as such, City staff recommends its acceptance upon approval from the City Council for the placement of the pen.

The round pen will be installed by City staff with assistance from Parks and Ingalls Crews. A 20-foot space will be maintained around the round pen for tractor access, ensuring that maintenance can be conducted without disrupting facility operations.

Priority Landscape, which currently provides weekly grooming for the arena, will also manage the weekly grooming of the round pen as part of the existing maintenance schedule. Maintenance costs will remain minimal, following the same procedures used for the arena.

The addition of the round pen at Basin Park will provide significant value to the local equestrian community, offering a designated space for horse owners to warm up and prepare their horses for arena use. With the generous donation from So Cal Fence and Barn, the round pen will be seamlessly integrated into the park's maintenance schedule.

Page 151 of 624 ends

FISCAL IMPACT:

The installation costs will be absorbed within the existing park operating budget, as City staff will handle the installation of the round pen. Priority Landscape will continue to provide weekly grooming for Basin Park and include the round pen into their scope of work. All maintenance costs will be accounted for within the Park Maintenance Contractual Services Account (No. 121.733.34100).

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction No. 5 Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Daphne Liu, Finance Director Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney

Page 152 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.G.

To: Honorable Mayor and City Council Members
From: Chad Blais, Public Works Director
Prepared By: Sam Nelson, Deputy City Engineer
Department: Public Works
SUBJECT:

Acceptance of the Citation Drive Storm Drain Project as Complete RECOMMENDATION:

Accept the Citation Drive Storm Drain Project as complete and authorize the City Clerk to file the Notice of Completion with the County of Riverside.

SUMMARY:

The Citation Storm Drain Project consisted of storm drain improvements on Citation Drive.

BACKGROUND:

On August 21, 2024 the City Council awarded a contract to Wright Construction Engineering Corp. in the amount of $365,000 and authorized the City Manager to approve contract change orders up to 10% for the Citation Drive Storm Drain Project.

The final contract amount paid to Wright Construction was $367,800. The increase in the amount paid was due to additional storm drain pipe.

Wright Construction has completed all the work required to the satisfaction of the City Engineer and a Notice of Completion has been prepared for recordation.

FISCAL IMPACT:

There is no fiscal impact for this item.

RELATIONSHIP TO STRATEGIC PLAN:

Page 153 of 624 ends

This item is consistent with Strategic Direction #5 – Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Daphne Liu, Finance Director Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Notice of Completion_Citation Drive Storm Drain Project

Page 154 of 624 ends

RECORDING REQUESTED BY: THIS DOCUMENT IS FILED AT THE REQUEST

REQUEST CITY OF NORCO OF THE CITY OF NORCO PURSUANT TO
WHEN RECORDED MAIL TO: SECTION 6103 OF THE GOVERNMENT
2870 CLARK AVENUE CODE. NO FEE IS CHARGED THEREFORE.

NORCO, CA 92860
ATTN: CITY CLERK

NOTICE OF COMPLETION

NOTICE IS HEREBY GIVEN BY THE CITY OF NORCO, A MUNICIPAL CORPORATION, STATE OF CALIFORNIA THAT THE

WORK DESCRIBED AS CITATION DRIVE STORM DRAIN PROJECT IN THE CITY OF NORCO IN ACCORDANCE WITH THE

TERMS AND WRITTEN CONTRACT DATED BETWEEN THE CITY OF NORCO AND WRIGHT CONSTRUCTION ENGINEERING CORP. WAS COMPLETED AND ACCEPTED BY THE CITY OF NORCO ON THE FIFTEENTH DAY OF JANUARY, 2025.

THE WORK DONE: CONSISTED OF STORM DRAIN IMPROVEMENTS ON CITATION DRIVE.

THAT THE CITY OF NORCO, A PUBLIC BODY, CORPORATE AND POLITIC, WHOSE ADDRESS IS 2870 CLARK AVENUE, NORCO, CALIFORNIA, 92860 IS THE OWNER OF SAID IMPROVEMENT WORK; AND THAT SAID WORK WAS PERFORMED BEGINNING AUGUST 21, 2024, IN THE CITY OF NORCO. THE NATURE OF INTEREST IS VENDEE UNDER CONTRACT.

THAT SAID WORK OF IMPROVEMENT WAS SO PERFORMED BY WRIGHT CONSTRUCTION ENGINEERING CORP. IN ACCORDANCE WITH SAID WRITTEN AGREEMENT DATED AUGUST 21, 2024, AND THE DRAWINGS AND SPECIFICATIONS WHICH WERE A PART OF SAID CONTRACT.

THIS NOTICE OF COMPLETION IS GIVEN BY THE CITY OF NORCO PURSUANT TO THE APPROPRIATE PROVISIONS OF TITLE XV, PART IV, DIVISION 1 OF THE CIVIL CODE OF THE STATE OF CALIFORNIA, AND UPON ORDER OF THE CITY OF NORCO.

JANUARY 15, 2025
DATED:

CITY OF NORCO

A MUNICIPAL CORPORATION
BY: __________________________

DANA ROA, CMC

CITY CLERK
VERIFICATION FOR NON-INDIVIDUAL OWNER:

I, THE UNDERSIGNED, DECLARE UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT I AM THE CITY CLERK OF THE CITY OF NORCO; THAT I HAVE SIGNED THE SAID NOTICE, THAT I KNOW AND UNDERSTAND THE CONTENTS THEREOF, AND THAT THE FACTS STATED THEREIN ARE TRUE AND CORRECT.

JANUARY 15, 2025 ______________________________

DATE DANA ROA, CMC

CITY CLERK

CITY OF NORCO

Page 155 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.H.

To: Honorable Mayor and City Council Members
From: Dana Roa, City Clerk
Prepared By: Dana Roa, City Clerk
Department: City Clerk
SUBJECT:

Appointments to Regional Boards, Standing Committees and Other City CouncilAppointed Committees for Calendar Year 2025 RECOMMENDATION:

Approve the City Council appointments to the various standing committees and other governmental agencies for the 2025 calendar year.

SUMMARY:

Mayor Newton has consulted with the Mayor Pro-tem and Council Members as to their preferred agency appointments based on their area of expertise, interest, and availability. Following his discussions, Mayor Newton has developed the 2025 list of appointments for approval.

BACKGROUND:

Each year, following the election of the new Mayor by City Council, appointments are made to various standing committees and other governmental agencies.

Public officials are allowed to make, participate in making, or use their official positions to influence decisions concerning their own appointments to positions as officers of the bodies of which they are members, such as committees, boards, commissions of public agencies, metropolitan planning organizations, and special districts, if the appointments are required to be made by either state or local law.

FISCAL IMPACT:

Not applicable for this item.

RELATIONSHIP TO STRATEGIC PLAN:

Page 156 of 624 ends

This is consistent with Strategic Direction #4 - Communication and Stakeholder Experience: Enhance the stakeholder experience, engage the community, and build brand awareness through proactive, effective and consistent communication.

REVIEWED AND APPROVED BY:

Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Agency and Committee Assignments 2025

Page 157 of 624 ends

City Council
Agency, Committees and Sub - Committee Appointments 2025 Updated: December 19, 2025
Agency Designee Alternate Meeting Date Time Place Stipend Chino Basin Desalter Authority Board Mayor Greg Newton
Public Works
Director Chad
Blais
1st Thursday
(Jan. Apr., Jul., Aug.) 6:00 p.m.
2151 S. Haven
Avenue, Suite 202,
Ontario
$150/meeting
no mileage
Riverside City Solid Waste Council Mayor Greg Newton As needed -- 150/meeting No mileage Northwest Mosquito and Vector Control District (*Two-year appointment: 2021-2023) Council Member
Gregory Bowen
Mayor
Greg Newton 3rd Thursday 3:00 p.m. 1966 Compton Avenue, Corona $100/meeting; no mileage Riverside Conservation Authority (RCA) Council Member Kevin Bash Mayor Greg Newton 3rd Wednesday No meeting in July 12:00 p.m. 3403 10th Street, Suite 320, Riverside $100/meeting plus mileage Riverside County Transportation Commission (RCTC) Council Member
Fia Sullivan
Council Member
Kevin Bash 2nd Wednesday 9:00 a.m. 4080 Lemon Street, 3rd Floor, Riverside $100/meeting plus mileage Riverside County – City Selection Committee (League of California Cities) Mayor Pro Tem
Robin Grundmeyer
Council Member
Kevin Bash
As needed - Meets prior to Monthly
LCC General Meetings
-
Riverside Transit Agency (RTA) Board Budget and Finance Committee Transportation Now Committee Council Member
Fia Sullivan
Council Member
Kevin Bash
4th Thursday
1st Wednesday
2nd Thursday
1:00 p.m. 2:00 p.m. 9:00 a.m.
4080 Lemon St. 1st Floor,
Riverside
1825 Third St. Riverside
Norco City Hall
Each is
$150/meeting
plus mileage
-
Western Riverside Council of Governments (WRCOG) Executive Committee Administration and Finance Committee Council Member
Kevin Bash
Mayor
Greg Newton
1st Monday
-
2nd Monday
2:00 p.m.
-
12:00 p.m.
3390 University Ave.

Suite 450
Riverside
$150/meeting;
no mileage
Western Riverside County Regional Wastewater Authority (WRCRWA) Public Works Director Chad Blais Council Member Greg Bowen Quarterly, 4th Thursday 2:00 p.m. Corona Public Works Office -- Committees Member Member Meeting Date Time Place
City Audit Committee Mayor Pro Tem
Robin Grundmeyer
Mayor
Greg Newton As needed -- Norco City Hall --
Corona-Norco Schools Committee Mayor Pro Tem
Robin Grundmeyer
Council Member
Kevin Bash
Quarterly, 3rd
Monday 3:30 p.m. CNUSD Office & Norco City Hall --

Page 158 of 624 ends

City Council
Agency, Committees and Sub - Committee Appointments 2025 Updated: December 19, 2025
Veterans’ Commission (Previously George A. Ingalls Veterans Memorial Plaza Committee) Mayor Pro Tem
Grundmeyer
Council Member
Kevin Bash
1st Monday of Every
Month -- Norco City Hall
United Norconians for Life Over Alcohol and Drugs (UNLOAD) Mayor Pro Tem Robin Grundmeyer Council Member Kevin Bash As needed Norco City Hall -- Navy Historic Properties Stakeholders Group Council Member Kevin Bash
Historic
Preservation
Commissioner
James Yellis
2nd Wednesday of
every 3rd month 3:00 p.m. Varies --
Manure and Trash Committee
(Previous Leads on Manure-to-Energy) Mayor Pro Tem Robin Grundmeyer Mayor Greg Newton Sub - Committees Member Member Meeting Date Time Place
City Council Observances Sub-committee

REMOVE NO LONGER NEEDED --
Kathy Azevedo Monument Sub-Committee Mayor
Greg Newton
Council Member
Kevin Bash As Needed - Norco City Hall -
City Manager Economic Development Working
Group
Mayor
Greg Newton
Council Member
Kevin Bash As Needed - Norco City Hall -
Homeless Solutions Sub-Committee Mayor Pro Tem
Robin Grundmeyer
Council Member
Fia Sullivan As Needed - Norco City Hall -
Veterans Housing Sub-committee Council Member
Kevin Bash
Council Member
Fia Sullivan As Needed - Norco City Hall -
EAT Program Sub-committee Mayor Pro Tem
Robin Grundmeyer
Council Member
Kevin Bash As Needed - Norco City Hall -
Riverside Transmission Reliability Project Subcommittee Council Member Kevin Bash Mayor Greg Newton As Needed - Norco City Hall - -

Page 159 of 624 ends

City Council

STAFF REPORT
Date: January 15, 2025 Agenda Item:

3.I.

To: Honorable Mayor and City Council Members
From: Alma Robles, Community Development Director
Prepared By: Alma Robles, Community Development Director Department: City Council
SUBJECT:

Approval of an amendment to the existing contract with Willdan Engineering to include the provision of Code Enforcement services, and an amendment to the FY 2024-25 Contractual Services budget for the Community Development Department - Code Enforcement Division.

RECOMMENDATION:

Approve the requested amendment to the existing contract with Willdan Engineering to add the provision of Code Enforcement services, and appropriate additional funding in the amount of $102,900 for FY 2024-25 - contractual services in the Code Enforcement Division of the Community Development Department.

SUMMARY:

The Code Enforcement Division consists of three full-time positions, a supervisor (currently vacant), a Senior Code Enforcement Officer (currently filled) and a Code Enforcement Officer (will be vacant after January 16, 2025). The requested amendment to the existing contract with Willdan Engineering, and the additional appropriation of funds will allow the provision of adequate Code Enforcement services until the end of FY 2024-25 or until the vacant positions are filled (whichever is less).

BACKGROUND:

The Community Development Department has an existing contract/agreement with Willdan Engineering for on-call Building and Planning Division services. The contract was extended in 2023 and is valid until September 17, 2025 (ref. Exhibit A - Existing Willdan Contract Report).

Staff is requesting that City Council approve an amendment to the existing contract with Willdan, to include the provision of Code Enforcement Services (ref. Exhibit B - Willdan Code Enforcement Services Proposal).

Page 160 of 624 ends

Staff is also recommending the additional appropriation of funds necessary for the provision of Code Enforcement services by Willdan. For FY 2024-25, the contractual services budget for Code Enforcement was set at $102,900 (mostly for abatement and legal services). This is reflected in the Community Development operating budget. Staff is recommending that the City Council approve a budget appropriation of $102,900 to Contractual Services (121.751.34100), to cover the cost of contractual Code Enforcement services (a supervisor for 20 hours a week and an officer for 36 hours a week) until the end of FY 2024-25 or until the vacant positions are filled (whichever is less).

FISCAL IMPACT:

The budget for contractual services related to the Building and Safety Division will be increased by $102,900 in the Fiscal Year 2024-25 Operating Budget under account number 121.751.34100. However, this increase will be offset by the vacancy of full-time Code Enforcement staff's salary and benefit savings of $32,000 ($26,175 for salary and $5,825 for benefits).

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with the Strategic Plan Directions No. 1 - Public Health, Safety and Wellness. Enhance quality of life by promoting's public health, safety and wellness initiatives for all community members.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Daphne Liu, Finance Director Approved by: Lisette Free, Interim City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Amendment No. 1 - Willdan Contract
Exhibit A - Exisitng Willdan Contract Report
Exhibit B - Proposal (Willdan Code Enforcement Services)

Page 161 of 624 ends

AMENDMENT NO. 1 TO CONTRACT

BUILDING AND SAFETY DIVISION PLAN CHECK SERVICES
This FIRST AMENDMENT is made and entered into this 15th day of January, 2025, by and between the City of Norco, a municipal corporation (hereinafter “CITY”) and Willdan Engineering, a corporation (hereinafter “CONSULTANT”).

Recitals
WHEREAS, on or about September 17, 2020, CITY and CONSULTANT entered into an Agreement for Building and Safety Division Plan Check Services and Planning Division Project and Environmental Review Services, (“AGREEMENT”); and
WHEREAS, the Parties now desire to expand the Scope of Services to include Code Enforcement as described in CONSULTANT’s Proposal dated December 24, 2024 attached hereto as Exhibit A; and
WHEREAS, the Parties also desire to amend the AGREEMENT to approve an additional $102,900 of funding for CONSULTANT to provide the services listed in Exhibit A on a time and materials basis.

NOW, THEREFORE, the parties hereto agree as follows:

1. The Scope of Services shall include Code Enforcement as described in Exhibit A.

2. The compensation provided to CONSULTANT shall be increased by an amount not to exceed $102,900 for said Services, billed on a time and materials basis.

3. Except as provided in this FIRST AMENDMENT, all other terms and conditions of the AGREEMENT shall remain in effect.

In witness whereof, the parties hereto have entered into this FIRST AMENDMENT the date and year first above written.

ATTEST: CITY OF NORCO
________________________________ ________________________________________ City Clerk Mayor
APPROVED AS TO FORM: WILLDAN ENGINEERING, INC.
_______________________________ _______________________________________ Attorney for the City By:

Its:

Page 162 of 624 ends

City Council

STAFF REPORT
Date: September 6, 2023 Agenda Item:

To: Honorable Mayor and City Council Members
Prepared By: Alma Robles, Planning Director
Department: Planning
SUBJECT:

A request for approval of a two-year extension on the existing contract with Willdan for the Building and Planning Division contractual services.

RECOMMENDATION:

Authorize the City Manager to extend the existing contract with Willdan for two additional years.

SUMMARY:

In 2020, the City Council authorized the City Manager to sign a contract extension with Willdan for three years with the option to approve two additional years by the City Manager. Willdan's fees are being adjusted slightly (primarily due to inflation), therefore the City Council needs to authorize the extension.

BACKGROUND:

The existing contract with Willdan is due to expire on September 17, 2023 (see the attached existing contract). Section 3.1.2 of the contract only provides authority to the City Manager to extend the contract for two years. It does not allow for contract modification, which the new fees would be a modification of the original agreement (see the attached updated renewal fees).

Staff is recommending that the City Council authorize the City Manager to extend the contract for two years for the following reasons:
• The change to the contract is minor and pertains to the fee schedule (minor increases due to inflation - higher employee costs, benefit costs, overhead, etc.).

Fees have not gone up since 2015 (with the original and existing contract). Fees would likely be higher if we were to re-negotiate a new contract. Below is the table that lists and compares the existing and new fees:

EXHIBIT "A"

Page 163 of 624 ends

Service Old Rate New Rate Percent
change Notes:

Plan review for
projects with a
valuation of $0 -
$100,000
70% 70% 0%
Plan review for
projects with a
valuation of
$100,000 -
$1,000,000
65% 65% 0%
Plan review for
projects with a
valuation of
$1,000,000 -
$5,000,000
60% 65% 0%
Plan review for
projects with a
valuation greater
than $5,000,000
50% 50% 0%
Plan Review
(Hourly) X $130 X
New fee option for
special projects or
reviews where a
traditional plan
review fee is not
charged.

Expedited Plan
Review $110
Plan check
percentage fee
x1.35 (135%)
Different
structure, 135%
expedite fee is
typical.

Building Official
Services $130 $140 8%
Building Inspector $95 $95 0%
Senior Building
Inspector X $105 X
New fee option to
employ a more
experienced and
certificated
Inspector
Permit Technician
Services
$65 $70 8%
Senior Permit
Technician
Services
X $85 X
New fee option to
employ a more
experienced
Permit Technician
CASp Services $110 $125 14%
Associate Planner $125 $135 8%
Assistant Planner $110 $115 5% X

Page 164 of 624 ends

Service Old Rate New Rate Percent
change Notes:
• The City now has a full-time building official; therefore contractual service costs have been going down incrementally as more plans checks are being done in house, and the Building Official supplements and fills in as an inspector. An additional two years will allow staff time evaluate the extent and need for contractual services in the future; and
• It is within the best interest of the City to continue a partnership because of Willdan's experience, consistency and knowledge of the City of Norco.

FISCAL IMPACT:

Contractual services related to the Building and Safety Division have been accounted for in the Fiscal Year 2023-24 Operating Budget.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Plan Direction No. 1 - Public Health, Safety and Wellness: Enhance quality of life by promoting public health, safety and wellness initiatives for all community members.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Lisette Free, Finance Director Approved by: Lori Sassoon, City Manager
Approved as to Form: Harper and Burns, LLC, City Attorney ATTACHMENT(S):

Existing Willdan Agrmt_3 Yrs_Sept 2020
Willdan Renewal Fees 2023

Page 165 of 624 ends

CITY OF NORCO

BUILDINGAND SAFETY DIVISIONPLAN CHECK SERVICES

PLANNINGDIVISION PROJECT ANDENVIRONMENTALREVIEWSERVICES SEPTEMBER 17, 2020 THROUGHSEPTEMBER 17, 2023 (3-Year Contract)

AGREEMENT

1. Parties and Date.

This Agreement is made and entered into this the 17th of September, 2020 by and between the City of Norco, a municipal corporation of the State of California, located at 2870 Clark Avenue, Norco, California92860, County of Riverside, State of California, (hereinafter referred to as “City” ) and Willdan Engineering, a corporation with its principal place of business located at 650 E.

Hospitality Lane, Suite 250, San Bernardino, CA92626, (hereinafter referred to as “Contractor”).

City and Contractor are sometimes individually referred to as "Party” and collectively as “Parties” in this Agreement.

2. Recitals.

2.1 Contractor.

Contractor desires to perform and assume responsibility for the provision of certain maintenance services required by The City on the terms and conditions set forth in this Agreement. Contractor represents that it is experienced in providing plan check sen/ices, and project and environmental review services, to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that isfamiliar withthe requirements of the City.

2.2 Project.

City desires to engage Contractor to render such services for the Building and Safety Division for Plan Check Services, and the Planning Divisionfor Project and Environmental Review Services (“Services”) as set forth in this Agreement.

3. Terms.

3.1 Scope of Services and Term.

3.1.1 General Sco e of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the Building and Safety Division plan check services and the Planning Division project and environmental review services on an as-needed basis necessary for the Servicer(“Services”). The Services are more particularly described in Attachment1 attached hereto and incorporated herein by reference. AllServices shall be subject to, and performed in accordance with this Agreement, and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The terms of this Agreement shall be from September 17, 2020 through September 17, 2023, unless earlier terminated as provided herein. Contractor shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The Parties may, by mutual written consent, extend the term of this Agreement for an additional two (2) years, as authorized by the City Manager.

Page 166 of 624 ends

am k .109nsun

3.2 Responsibilities of Contractor.

3.2.1 Control and Pa ment of Subordinates' lnde endent Contractor. The Services shall be performed by Contractor or under its supervision. Contractor willdetermine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Contractor on an independent contractor basis and not as an employee.

Contractor retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, incom tax withholding, unemployment insurance, disability insurance, and workers’ e compensation
insurance.

3.2.2 Schedule of Services. Contractor shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Attachment 1 attached hereto and incorporated herein by reference. Contractor represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. in order to facilitate Contractor’s conformance with the Schedule, City shall respond to Contractor’s submittals in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services.

3.2.3 Conformance to A licable Re uirements. All work prepared by Contractor shall be subject to the approval of City.

3.2.4 Ci ‘s Re resentative. The City hereby designates the Director of Planning, or his or her designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Agreement. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.2.5 Contractors Re resentative. Contractor hereby designates am ‘.1Johnson , or his or her designee, to act as its representative for the performance of this Agreement (“Contractor's Representative"). Contractor's Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement.

The Contractors Representative shall supervise and direct the Services, using best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.

3.2.6 Coordination of Services. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City’sstaff, consultants and other staff at all reasonable times.

3.2.7 Standard of Care‘ Performance of Em lo ees. Contractor shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling

Page 167 of 624 ends

necessary to perform the Services. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor's failure to comply with the standard of care provided for herein. Any employee of the Contractor or its sub-contractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Agreement, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be reemployed to perform any of the Services or to work on the Project.

3.2.7.1 Period of Performance and Li uidated Dama es. Contractor shall perform and complete allservices under this Agreement within the term set forth in Section

3.1.2 above (“Performance Time”). Contractor shall perform the Services in strict accordance with any com letion schedule attached hereto, or which may be provided separately in writing to the Contractor. Contractor agrees that if the Services are not completed within the aforementioned Performance Time and/or pursuant to any such completion schedule or Project milestones developed pursuant to provisions of this Agreement, it is understood, acknowledged and agreed that the City willsuffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as ?xed and liquidated damages, and not as a penalty, the sum of, $100.00 per day.

3.2.8 Laws and Re ulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Services. if the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall "defend, indemnify and hold City, its of?cials, directors, of?cers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.2.9 Insurance.

3.2.9.1 Time for Corn liance. Contractor shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance re uired under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section.

3.2.9.2 Minimum Re uirements. Contractor shall, at its expense, procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Agreement by the Contractor, its agents, representatives, employees or subcontractors.

Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Agreement. Such insurance shall meet at least the following minimum levels of coverage:

Page 168 of 624 ends

(A) Minimum Sco e of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Of?ce Commercial General Liability coverage (occurrence form CG 0001); (2) Automobile Liability:

Insurance Services OfficeBusiness Auto Coverage form number CA 0001, code 1 (any auto); and (3) Workers’ Compensation and Employer’s Liability:Workers’ Compensation insurance as required by the State of Californiaand Emp|oyer’s Liability Insurance. (B) MinimumLimits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $1,500,000 per occurrence for bodily injury, personal injury and property damage. IfCommercial General Liability Insurance or otherforrn with general aggregate limitis used including, but not limited to, form CG 2503, either the general aggregate limit shall apply separately to this Agreement/location or the general aggregate limitshall be twice the required occurrence limit; (2) Automobile Liability: $1,500,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation and Employers Liability: Workers’ Compensation limits as required by the Labor Code of the State of California. EmpIoyer’s Liabilit y limits of $1,000,000 per accident for bodily injury or disease.

3.2.9.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements on forms supplied or approved by the City to add the following provisions to the insurance policies:
(A) General Liabilit . The general liabilitypolicy shall be endorsed to state that: (1) the City, its directors, officials, of?cers, employees, agents, and volunteers shall be covered as additional insured with respect to the work or operations performed by or on behalf of the Contractor, including materials, parts or equipment furnished in connection with such work; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, of?cials, officers, employees, agents, and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Contractor’sscheduled underlying coverage. Any insurance or self-insurance maintained by the City, its directors, of?cials, officers, employees, agents, and volunteers shall be excess of the Contractor’s insurance and shall not be called upon to contribute with it in any way.
(B) Automobile Liabilit . The automobile liability policy shall be endorsed to state that: (1) the City, its directors, officials, officers, employees, agents, and volunteers shall be covered as additional insured with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Contractor or for which the Contractor is responsible; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, of?cials, of?cers, employees, agents, and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, it directors, officials, of?cers, employees, agents, and volunteers shall be excess of s the Contractor’s
insurance and shall not be called upon to contribute with it in any way. (C) Workers’ Com nsation and Em Io er’s Liabilit Covera e. The insurer shall agree to waive all rights ofsubrogation against the City, its directors, officials, of?cers, employees, agents, and volunteers for losses paid under the terms of the insurance policy which arise from work performed by the Contractor.
(D) AllCovera es. Each insurance policy required by this Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (B) any failure to comply with reporting or other provisions of the

Page 169 of 624 ends

policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, of?cers, employees, agents, and volunteers.

3.2.9.4 Se aration of insureds‘ No S ecial Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. in addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, of?cers, employees, agents, and volunteers.

3.2.9.5 Deductibles and Self—|nsurance Retentions. Any deductibles or selfinsured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or selfinsured retentions as respects the City, its directors, of?cials, of?cers, employees, agents, and volunteers; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

3.2.9.6 Acce tabilit of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:V|ll, licensed to do business in California, and satisfactory to the City.

3.2.9.7 Veri?cation of Covera e. Contractor shall furnish City with original certi?cates of insurance and endorsements effecting coverage required by this Agreement on forms satisfactory to the City. The certi?cates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms provided by the City if requested. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.2.9.8 Re ortin of Claims. Consultant shall report to the City, in addition to Consu|tant’s insurer, any and all insurance claims submitted by Consultant in connection with the Services under this Agreement.

3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.3 Fees and Payments.

3.3.1 Com ensation. Contractor shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in the Proposal Form, attached hereto and incorporated herein by reference. The Services shall be performed on an “as needed" basis. Extra work may be authorized, as described below, and if authorized, willbe compensated at the rates and manner set forth in this Agreement.

Page 170 of 624 ends

3.3.2 Pa ent of Compensation. Contractor shall submit to City a monthly itemized statement which indicates project or address, category of service, fee, and person performing plan check; and any other item of infonnation the City may deem necessary for tracking purposes including hours associated withservice. City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

3.3.3 Reimbursement for Ex enses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement.

Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City's Representative.

3.3.5 Prevailin Wa es. This contract willincorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages, apprenticeship employment standards, and Contractor registration program established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion willbe also required.

3.4 Accountin Records.

3.4.1 Maintenance and Ins ection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. Allsuch records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of A reement.

3.5.1 1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services which have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Agreement except for cause.

3.5.1.2 Effect of Termination. ifthis Agreement is terminated as provided herein, City may require Contractor to provide all finished or un?nished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information withinfifteen (15) days of the request.

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

Page 171 of 624 ends

3.5.2 Delive of Notices. Allnotices permitted or required under this Agreement shall be given to the respective parties at the follow address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor: Willdan Engineering
650 E. Hospitality Lane, Suite 400
San Bernardino, CA 92626
Attention: Patrick Johnson, PE
City: City of Norco
2870 ClarkAvenue
Norco, CA 92860
Attention: Alma Robles
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the US Mail,first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Coo eration' Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.4 Attorne ’s Fees. if either party commences an action against the other party, either legal, administrative or othenrvise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney's fees and all other costs of such action.

3.5.5 Indemnification. Contractor shall defend, indemnify and hold the City, its officials, of?cers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage, or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged acts, omissions or willful misconduct of Contractor, its of?cials, of?cers, employees, agents, consultants, and contractors arising out of or in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses. Contractofs obligations under this heading shall not extend to claims, demands, causes of action, costs, expenses, liability, loss, damage, or injury that arise out of the sole negligence or willful misconduct of the indemnified parties. Contractor shall defend, at Contractor’s own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, of?cers, employees, agents, or volunteers. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, of?cials, officers, employees, agents, or volunteers, in any such suit, action or other legal proceeding. Contractor shall reimburse City and its directors, officials, officers, employees, agents, and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, of?cials of?cers, employees, agents, or volunteers.

Page 172 of 624 ends

3.5.6 Entire A reement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.7 Governin Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County

3.5.8 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.9 Cit ‘s Ri ht to Em lo Other Contractors. City reserves right to employ other contractors in connection with this service.

3.5.10 Successors and Assi ns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.11 Assi nment or Transfer. Contractor shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.12 Construction‘References" Ca tions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to itsfair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. Allreferences to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Agreement. Allreferences to City include its elected officials, of?cers, employees, agents, and volunteers except as othenrvise specified inthis Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content or intent of this Agreement.

3.5.13 Amendment‘ Modification. No supplement, modi?cation or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or othenrvise.

3.5.15 No Third Part Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.5.16 lnvalidit ' Severabilit . If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in fullforce and effect.

3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working

Page 173 of 624 ends

solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Contractor further agrees to ?le, or shall cause its employees or subcontractors to ?le, a Statement of Economic Interest with the City’s Filing Of?cer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service withCity, shall have any direct interest inthis Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.18 Egual Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initia l employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liabilityfor Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.20 Authorit to Enter A reement. Contractor has all requisite power_ and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.21 Counter arts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.6 Subcontracting.

3.6.1 Prior A roval Re uired. Contractor shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

Page 174 of 624 ends

CONTRACTOR:

ENGINEERIN
atrick Johnsu PE — Director of B ‘lding & Safety
Date
*By
Signature
Da , City Clerk
APPROVEDAS OFORM: A EST:

John R. Harper, ityA orney
Berwin nna,M or
Name and Title
OWNER:CITY OF NORCO, a municipal corporation
W
*
Date
Name of Contractor
Sngna ure
Name and Title
Buildm
I7—
}‘.'n’’ ~a1r‘c' i. I‘

Page 175 of 624 ends

~. ,».«Norco

SERVICEPROVIDED
Plan review for projects with a valuation
$100,000
Plan review for projects with a valuation of
$100,000 - $1,000,000
Plan review for projects with a valuation of
$1,000,000 - $5,000,000
Plan review for projects with a valuation
greater than $5,000,000
Expedited Plan Review
ADD|Tl0NAL SERVICES
Inspection Services
Building Official Services
CASp Services
Permit Technician Services
FEE
70% of fee collected by Cit
y
65%of fee collected by City
60% of fee collected by City
50% of fee collected by City
$110 per hour
$ 95 per hour
$130 per hour
$110 per hour
S 65 per hour

WILLDAN
Engineering
Cityof Norc
Buildingand SafetyService o
Page s I 13
___—--__.._; .... :::—;,‘:;:.';.nn—-uusn "3{§6

Page 176 of 624 ends

June 2, 2020
Mr. Steve King
City of Norco
Building& Safety Division
2870 Clark
Norco, CA 92860
Subject: Contract Renewal
Dear Mr. King:

Per our discussion, Willdan is pleased to continue to provide services to the City of Norco. Our Fee Schedule will remain unchanged as follows:

Plan review for projects with a valuation of $0 - $100,000 Plan review for projects with a valuation of $100,000 - $1,000,000 Plan review for projects with a valuation of $1,000,000 - $5,000,000 Plan review for projects with a valuation greater than $5,000,000 Expedited Plan Review

ADDITIONALSERVICES
Inspection Services
Building Of?cial Services
CASp Services
Permit Technician Services
Associate Planner
Assistant Planner
70% of fee collected by City
65% of fee collected by City
60% of fee collected by City
50% of fee collected by City
$110 per hour
$ 95 per hour
$130 per hour
$110 per hour
S 65 per hour
$125 per hour
$110 per hour

WILLDANENGINEERIN
‘N -[.j -3_ —. 2 !
V 7'39 ?f':~i? ' I r-Est: gm», "--1. .,~“ I‘-1
‘ ’ 7 I
‘r »-_» L
“ " iii‘ ...
'= "'3 ': ! "” rue;-*: . .

I
\ x‘\ a 4 _.;r:~1.,‘ I , »‘.I\,s/.\:,,“|_.'_h :-‘ _--3" Please feel free to contact me should you have any questions or require additional information.

Respectfully submitted,
Patrick Johnson, PE
Director of Building and Safety
'ohnson wil|dan.com
90~3.386.0?00 800.789 751? I fax; 909 888.5107 Q650 E. Hospitality Lane, SLNIG400, San Bernardinc. CA 923408 1www willaan Corr.

SERVICEPROVIDE FE

Page 177 of 624 ends

July 5, 2023
Mr. Steve Raney
City of Norco
Building & Safety Division
2870 Clark
Norco, CA 92860
Subject: Contract Renewal
Dear Mr. Raney:

Please see the following table for revised fees pertaining to building and safety services:

SERVICE PROVIDED FEE
Plan review for projects with a valuation of $0 - $100,000 70% of fee collected by City Plan review for projects with a valuation of $100,000 - $1,000,000 65% of fee collected by City Plan review for projects with a valuation of $1,000,000 - $5,000,000 60% of fee collected by City Plan review for projects with a valuation greater than $5,000,000 50% of fee collected by City Plan Review (Hourly) $130 per hour
Expedited Plan Review (Fee above) X 1.35

ADDITIONAL SERVICES
Building Official Services $140 per hour
Senior Building Inspector $105 per hour
Building Inspector $95 per hour
CASp Services $125 per hour
Permit Technician Services $70 per hour
Senior Permit Technician Services $85 per hour
Associate Planner $135 per hour
Assistant Planner $115 per hour
Please feel free to contact me should you have any questions or require additional information.

Respectfully submitted,

WILLDAN ENGINEERING
Patrick Johnson, PE
Director of Building and Safety
[email protected]

Page 178 of 624 ends

EXHBIT “B”
December 24, 2024
Ms. Alma Robles, Director of Community and Economic Development Mr. Steve Raney, Building Official
City of Norco
2870 Clark Avenue
Norco CA 92860
Subject: Code Enforcement Services
Dear Ms. Robles and Mr. Raney:

Willdan Engineering (Willdan) appreciates the opportunity to submit this proposal to provide contract code enforcement services to the City of Norco. We have outlined our approach to the services requested and presented our key staff in the attached document.

With a history spanning 60 years in municipal consulting services, Willdan Engineering (Willdan) has solidified a reputation for delivering unparalleled code compliance solutions to municipalities across the State of California. Our extensive expertise, dedication to excellence, and proven track record in providing exceptional code enforcement services uniquely position us as a prime candidate to assist the City of Norco.

Understanding the pivotal role that effective code enforcement plays in nurturing a thriving municipality, we are well-equipped to provide tailored and comprehensive code services that cater to the specific needs of each client. Our portfolio is a testament to our capabilities, having successfully supported numerous jurisdictions, including noteworthy clients such as the cities of La Puente, Torrance, Redlands, Inglewood, Orange County, and San Diego County.

At Willdan, our code enforcement management team is composed of seasoned professionals, each bringing their extensive experience to the table. Our team includes Deputy Director Al Brady (35 years of code enforcement experience), Code Enforcement Manager Terry Cox (27 years), Code Enforcement Manager Kerry Simpson (35 years), Code Consultant John Poole (40 years), Code Consultant Ed Nicholls (35 years), Code Consultant Scott Barber (30 years), and Code Supervisor Victor Martinez (25 years). Furthermore, our roster of code enforcement officers comprises former code directors, managers, supervisors, senior-level officers, and experienced code enforcement specialists.

In the attached proposal, we define our comprehensive approach to the array of code enforcement services we provide. This document also introduces our key staff who would be dedicated to the success of the proposed project. Should you have any questions or require additional information, please do not hesitate to contact me at (951) 454-3539 or Mr. Cox at (562) 233-8969.

Thank you for your consideration.

Respectfully submitted,

WILLDAN ENGINEERING
Albert Brady, CBO
Deputy Director of Building & Safety
E: [email protected]

Page 179 of 624 ends

City of Norco
Table of Contents
Firm Profile .................................................................................................................................. 2 Scope of Work ............................................................................................................................. 4 Project Manager .......................................................................................................................... 4 Fee Schedule ................................................................................................................................ 5 Related Experience ...................................................................................................................... 5 References.................................................................................................................................... 7 Resumes....................................................................................................................................... 8

Page 180 of 624 ends

City of Norco
City of Rancho Palos Verdes Code Enforcement Services
Page | 2
Firm Profile
Willdan Engineering, a California corporation since 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Services are provided to nationwide clientele through three subsidiary firms – Willdan Engineering, Willdan Energy Solutions, and Willdan Financial Services – that offer a portfolio of diversified strengths. Throughout our history, Willdan Engineering (Willdan) has served as a full-service, multi-disciplinary firm specializing in building safety, municipal engineering, planning, and construction management and inspection services, along with a full complement of support disciplines.

Willdan stands out from other providers through our additional resources, availability, high-level oversight, and on-time performance.

Our ability to provide additional resources, such as dedicated project management staff, state-of-the-art technology, and specialized expertise, sets us apart from other firms. We also prioritize availability, with an on-site team ready to respond to emergencies and urgent requests.

Our approach to service provision is based on responsiveness, costcontrol measures, and practical training programs. We understand the importance of timely and efficient service delivery, and our team is committed to providing quick response times while maintaining cost-effectiveness. We prioritize effective training programs to ensure our staff possesses the necessary skills and knowledge to perform their duties to the highest standards.

Code Enforcement
Willdan’s code enforcement management team possesses over 100 years of experience in code program development and oversight. Our team is available to perform program assessments and make recommendations to improve code divisions. Our staff members review entire programs and provide analysis of specific program areas such as code databases, revenue collection efforts, policies and procedures, and community-based neighborhood improvement programs.

In addition, our team of code enforcement personnel assists jurisdictions with the difficult task of maintaining the quality of life for their citizens. Willdan's staff offers extensive public agency experience in the areas of neighborhood preservation, housing inspection, and code enforcement. Our expertise includes the development and implementation of inspection programs designed to ensure public safety, promote community involvement, and protect the quality-of-life issues through community education and enforcement of municipal and related codes including preparation for, and participation in, prosecution by city and district attorneys.

Code Enforcement Services
Staffing: We provide highly skilled personnel on a full-time or part-time basis for both shortterm and long-term projects. Our staff is available to work evenings, weekends, and on an as-needed or on-call basis. Our team has extensive public agency experience and can staff individual positions or a full division.

Development & Implementation: Willdan offers support in such areas as municipal code amendments, specialized programs, revenue protection and collection programs, and community-based neighborhood improvement programs.

Page 181 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Page | 3
Management: We have talented management personnel with all levels of experience to serve as code enforcement directors, code compliance managers, and code supervisors.

Analysis: Our staff has reviewed entire programs for several municipalities but can also provide analysis of specific program areas such development of policies and procedures and community-based neighborhood improvement programs.

Other Services: Willdan offers expert support with a multitude of other services including grant proposal writing, community education, neighborhood clean-up events, graffiti prevention, vendor enforcement, and civil abatements and receiverships.

Code enforcement services are among the most complex and challenging services that government agencies provide. According to nationwide studies, property values, crime rates, insurance rates, business development, and the sense of community pride can be directly impacted by the successes of a jurisdiction’s code enforcement program.

Willdan provides the following Code Enforcement Services:
• Inspection services for HUD section 8 programs.
• Review, study, and analysis of existing programs.
• Development of ordinances and writing of grant proposals. • Neighborhood cleanup and improvement programs.
• Community education programs.
• Development of educational materials.
• Provide project managers and/or supervisors as onsite “employees.” • Provide full-time, part-time, interim, and/or weekend staff as onsite “employees.”
• Vehicle abatement and parking enforcement.
• Assist in enforcement, including preparation and participation in prosecution by city and district attorneys.
• Illegal street/food vendor enforcement.
• The registration and enforcement of vacation rentals. • The regulation of group and/or sober living homes.
• The operation of rental inspection programs.
• Inspection, regulation, and enforcement of marijuana dispensaries and grow houses.

Page 182 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Page | 4
Scope of Work
Contract Code Inspection Services
The project shall consist of Willdan staff coordinating with the City of Norco Community Development Department and providing Code Enforcement staff to the City. Willdan staff shall conduct inspections and re-inspections of code enforcement cases and will also identify and enforce all violations of the City’s municipal code, ordinances, laws, and all applicable statutes as directed by City personnel. Willdan employees shall issue notifications, letters, and citations when necessary to achieve compliance. Staff will be required to document all complaints received, and inspections conducted through photos, notes, and correspondence. In addition to the services mentioned above, Willdan employees would provide the following to the City as needed (this is not intended to be a comprehensive list):
 Investigate complaints from the public and staff regarding violations of the municipal codes, ordinances, standards, and health and safety regulations.  Initiate contact with residents, business representatives, and other parties to explain the nature of the violations and encourage voluntary compliance with municipal codes, zoning and land use ordinances, and community standards.
 Prepare notices of violation for non-compliance according to applicable codes and regulations.  Prepare reports for cases requiring legal action or civil abatement.  When required, meet with legal counsel, and provide testimony on criminal cases.  Maintain records of complaints, inspections, violation notices, and other field enforcement activities.
 Coordinate with City departments on cases as they relate to code enforcement.

Project Management
Al Brady shall be the Principal-in-Charge of this project. Mr. Brady has over 35 years of experience in the code profession and has provided contract code services to approximately 100 municipalities in California, Arizona, and Nevada. He specializes in developing new code programs, improving existing divisions, revenue enhancement, ordinance revisions, maximizing staff efficiency, and enhancing customer relations.

Terry Cox shall be the Project Manager with final oversight of the contract. Mr. Cox has over 27 years of experience in the code profession and has provided contract code services to multiple municipalities in California. His expertise lies in the development of innovative code programs, enhancement of existing departments, effective management of vendor enforcement operations, revision of ordinances, provision of staff training, optimization of staff productivity, and improvement of customer relationships.

Page 183 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Page | 5
Fee Schedule
Willdan will provide contract code enforcement services to the City of Norco for a flat hourly rate based on the Willdan hourly rate schedule below. All rates and costs shall be effective through the terms of the agreement.

SERVICE PROVIDED HOURLY RATE
Code Enforcement/Project Manager $130/hour
Code Enforcement Consultant/Trainer $125/hour
Code Enforcement Supervisor $110/hour
Senior Code Enforcement Officer $90/hour
Code Enforcement Officer $75/hour
Code Enforcement Technician $65/hour
Should Willdan be required to provide vehicles for the officers, an additional $10/hr will be added to the rate.

NOTE: Overtime rates of 1.5x the regular hourly rate will be charged for all overtime hours worked.

Related Experience
City of La Puente – Project Manager. Provided interim code enforcement management and supervisory staff who were responsible for temporarily overseeing the city’s code program.

City of South Pasadena – Project Manager. Providing interim code enforcement staff.

City of Downey – Project Manager. Providing interim code enforcement staff.

City of Big Bear Lake – Project Manager. Provide seasonal code enforcement staff for the enforcement of short-term lodging.

City of Laguna Beach – Project Manager. Provided code enforcement staff on a contract basis to address unregistered and non-complaint vacation rentals.

City of Palm Desert – Project Manager. Provided code enforcement staff on a contract basis to address unregistered and non-complaint vacation rentals.

City of Irwindale – Project Manager. Provided municipal code enforcement services including monitoring of a local racetrack for compliance with the City Sound Ordinance on an interim basis.

City of Long Beach – Project Manager. Provided interim code enforcement staff who were responsible for enforcing the City’s Municipal Code.

Page 184 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Page | 6
County of Orange – Project Manager. Providing long-term code enforcement staff.

City of Laguna Hills – Project Manager. Assisted the city in the development of a public education program concerning the city’s code program.

City of Los Alamitos - Directed and participated in review of the city’s code enforcement policy and procedures and made recommendations for changes, as necessary. Additionally, provided interim code enforcement staff and a Community Development Director.

City of Hawaiian Gardens – Project Manager. Assisted the City of Hawaiian Gardens in developing and implementing an Administrative Citation program.

City of Rosemead - Project Manager. Provided interim code enforcement staff to inspect targeted areas of the city to facilitate neighborhood improvements.

City of San Clemente – Project Manager. Provided interim Code Enforcement staff to assist with their Code Enforcement Program.

City of Superior, AZ - Direct and participate in the review of the city’s code enforcement policy and procedures and make recommendations for changes, as necessary. Development and Implementation of a Nuisance and an Administrative Citation Ordinance.

City of La Canada Flintridge - Direct and participate in the review of the city’s code enforcement policy and procedures and make recommendations for changes, as necessary. Development and Implementation of a Nuisance, Cost Recovery and an Administrative Citation Ordinances. Provided interim code enforcement staff to conduct inspections and facilitate neighborhood improvements.

City of Del Mar - Provided interim code enforcement staff to the City and managed their entire Code program.

City of Newport Beach - Provided interim code enforcement staff to the City and managed their entire Code program.

It should be noted that the project list above is not a comprehensive list of all our past code clientele but represents a small portion of the Municipalities we have served. We have also successfully provided services to the following jurisdictions as a further sample of our experience and clientele:
• Bradbury
• Burbank
• Costa Mesa
• Desert Hot Springs
• El Monte
• Folsom
• Fountain Valley
• Hermosa Beach
• Huntington Beach
• Laguna Woods
• Laguna Niguel
• Manhattan Beach
• Maywood
• Pasadena
• San Diego County
• San Juan Capistrano
• San Luis Obispo
• Sierra Madre
• Thousand Oaks
• Ventura
• West Hollywoood

Page 185 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Page | 7
References
City of La Puente
John Di Mario
15900 East Main Street
La Puente, CA 91744
(626) 855-1517
Project: Program assessment, development, training, and implementation. Staff augmentation providing full-time staffing, enforcement of building, zoning, and nuisance-related issues.

City of La Canada Flintridge
Susan Koleda
1327 Foothill Boulevard
La Canada Flintridge, CA 91011
(818) 780-8881
Project: Provided interim code enforcement staff.

City of Torrance
Michelle Ramirez
3031 Torrance Boulevard
Torrance, CA 90503
(310) 618-2550
Project: Staff augmentation, providing code enforcement staff, enforcement of building, zoning, vendor, and nuisance-related issues.

City of Inglewood
Jerry Tucker
1 Manchester Boulevard, 4th Floor
Inglewood, CA 90301
(310) 412-5590
Project: Providing code enforcement staff for vendor enforcement needs at (SoFi Stadium and The Forum).

In closing, Willdan has provided code compliance services to numerous different California Cities and Counties. We are confident our team can provide the customer service-based code compliance program the City is seeking. We hope this proposal meets with your approval. The resumes for our proposed team can be found below. Please let me know if you have any questions or require additional information.

Page 186 of 624 ends

City of Norco
City of Costa Mesa Code Enforcement Services
Albert Brady, C.B.O.

Deputy Director of Building & Code Enforcement
Mr. Albert Brady is a Willdan Engineering code enforcement manager with 30 years of experience. Mr. Brady is responsible for Code Enforcement Services Company wide including California and Arizona. Mr. Brady leads a team of code enforcement professionals who can provide both short and long-term services including management of code enforcement departments.

Relevant Project Experience
County of Riverside, California. Code Enforcement Director. Managed the Code Enforcement Department for the entire County of Riverside. Assigned to oversee all operations and respond to all citizen concerns, County CEO complaints and Board inquiries; Prepare and monitor the Department's budget including all revenues and expenditures. Prepare regular staff reports for the Board of Supervisor’s regarding ordinance development and/or municipal code revisions. Provide personnel with direction, develop and update the Division's Policy and Procedure manual and verify that staff adheres to all policies established within the Department. Evaluate staff's performance on a regular basis and pursue disciplinary action when appropriate.

Interview and hire all personnel. Attend regular staff meetings; meet with civic groups such as the Chamber of Commerce, Board of Realtors, Neighborhood groups and Homeowner's Associations. Interact with various departments, County, State and Federal organizations when necessary. Interact with The Riverside County District Attorney’s Office regarding criminal investigations and County Counsel for Civil proceedings such as Nuisance abatements, injunctions and/or receiverships.

AndersonPenna, Newport Beach, California. Code Enforcement Manager. Managed the Code Compliance Division for a firm that provides contract code services to Municipalities in Southern California. Contract services varied from staff augmentation, program development and consulting. Provided service to different jurisdictions in California including the following government agencies; County of Orange, City of Laguna Woods, Pasadena, Ventura, La Canada Flintridge, Upland, Fountain Valley, Tustin, Desert Hot Springs, and San Juan Capistrano. Developed and implemented code programs, ordinances (civil citation, nuisance ordinance, rental inspection programs) and policies and procedures manuals. Managed all contracts for service delivery and all contract employees assigned to the projects. Attended regular City Council meetings and assured projects remained within budget.

City of Moreno Valley, California. Code & Neighborhood Services Official. Responsible for managing the Code and Neighborhood Services Division which is comprised of the Parking Enforcement Team and the Code Compliance Group. Assigned to oversee all operations and respond to all citizen concerns, City Manager complaints and Council inquiries; Prepare and monitor the Division's budget including all revenues and expenditures.

Manage agreements with outside contractors that provide service to the City including Riverside County Environmental Health, Abatement Contractors, and Citation Processing Services. Monitor and prepare quarterly and annual reports for three separate Federal prograMr. Prepare regular staff reports for City Council regarding ordinance development and/or municipal code revisions. Manage specialized programs such as the City's Graffiti Restitution Program, Shopping Cart Containment Ordinance and the Rotational Tow Service Program. Provide personnel with direction, develop and update the Division's Policy and Procedure manual and verify that staff adheres to all policies Education
1988, AA, Liberal Arts,
California State University,
Fullerton
1990, BA, Business
Administration, University of
Southern California, Los Angeles
Registration
PC 832 Certificate, Orange
County Sheriff's Academy,
Orange, CA
Basic Certification, SCACEO -
Southern California Association
of Code Officials
Intermediate Certification,
SCACEO - Southern California
Association of Code Officials
Advanced Certification, SCACEO
- Southern California
Association of Code Officials
Supervisory Certification,
SCACEO - Southern California
Association of Code Officials
Watershed Management
Certificate, EPA - Environmental
Protection Agency, Sacramento,
CA
ICC Certified Building Official
Affiliations
Past Education Chair, California
Association of Code Officials,
Sacramento, CA
Past Board Member, California
Association of Code
Enforcement Officials,
Sacramento, CA
Member, American Association
of Code Enforcement
30 Years’ Experience

Page 187 of 624 ends

City of Norco
City of Norco Code Enforcement Services
established within the Division. Evaluate staff's performance on a regular basis and pursue disciplinary action when appropriate. Interview and hire personnel. Attend regular staff meetings; meet with civic groups such as the Chamber of Commerce, Board of Realtors, Neighborhood groups and Homeowner's Associations.

Willdan, Anaheim, California. Code Enforcement Supervisor. Managed the Code Compliance Division for a firm that provided contract code services to Municipalities in the western United States. Contract services varied from staff augmentation, program development and consulting. Provided service to different jurisdictions in California, Arizona and Nevada including the following government agencies; County of Orange, City of Anaheim, South Pasadena, Bradbury, La Canada Flintridge, Rosemead, Hawaiian Gardens, Los Alamitos, Irvine, Laguna Hills, Del Mar, La Palma, and San Juan Capistrano.

Developed and implemented code programs, ordinances (civil citation, nuisance ordinance, rental inspection programs) and policies and procedures manuals. Managed all contracts for service delivery and all contract employees assigned to the projects.

Attended regular City Council meetings and assured each project remained within budget.

City of Anaheim, California. Senior Code Enforcement Officer. Supervised the CDBG team of the Code Enforcement Division which consisted of seventeen employees.

Enforced City regulations and codes to enhance and preserve the quality of neighborhoods. Received citizen complaints of Municipal Code violations and coordinated the resolution of those concerns. Provided training to employees; established and maintained the Division's policy and procedure manual and ensured that the established practices were followed. Performed regular evaluations of employees, prepared internal and external memorandums, staff reports, developed ordinances and assisted with the annual preparation of the Planning Department Budget.

City of Anaheim, California. Code Enforcement Officer II. Conducted field investigations and site surveillance of residential, commercial and industrial properties. Enforced all applicable code provisions, ordinances and statutes; issued infraction and misdemeanor citations for violations regarding zoning, litter, abandoned vehicles, weeds and debris accumulation. Photographed evidence, prepared diagrams, interviewed potential witnesses and composed letters to ensure remedial action was taken; received complaints from citizens; issued correction notices and performed abatements when necessary. Prepared memos and investigative reports.

City of Anaheim, California. Code Enforcement Officer I. Performed field inspections and enforced municipal code provisions (such as animal regulations, business license requirements, and building permits). Explained regulations relating to municipal code provisions including zoning, land use, planning, and design review. Responded to citizen complaints regarding potential code violations; conducted research of property ownership, past permits and all applicable code regulations. Coordinated enforcement actions with other City departments and other governmental agencies, as necessary.

City of Anaheim, California. Housing Coordinator/Inspector. Performed field inspections of all Section 8 Housing Vouchers for the City of Anaheim Housing Authority. Inspections were performed to verify compliance with the Housing Quality standards; for new vouchers and as part of the annual recertification program. Additional duties included providing notices for non-compliant units to both property owners and residents, negotiating rents, performing recertification paperwork, re-inspections of non-compliant units, and assisting customers with additional benefits available through the family selfsufficiency program.

Albert Brady
Continued

Page 188 of 624 ends

City of Norco
City of Norco Code Enforcement Services
John (Terry) Cox
Code Enforcement Manager
Mr. Terry Cox is a Code Official with over 26 years’ experience in addressing community blight through developing effective neighborhood strategies. He has demonstrated the ability to train, motivate and manage cohesive teams focused on preserving communities. He is experienced in neighborhood improvement projects, operational management, community relations, consulting and project management.

Relevant Project Experience
County of Orange, CA. Code Enforcement Manager. Oversaw the day-to-day operations of the Neighborhood Preservation Section with the County of Orange, which includes the training and supervision of both County and contract staff. Worked closely with staff from the Board of Supervisors, CEO’s office, multiple County Departments, and additional outside agencies to coordinate investigations/enforcement activities and communicate findings/results, as well as to provide thorough and effective service to unincorporated islands within the County of Orange. Prepared and provided staff reports, departmental work plans, educational/informational materials and special presentations related to code enforcement. Developed and implemented policies and procedures to improve program efficiency and effectiveness. Coordinated and implemented special projects such as community cleanup days, target area sweeps and community meetings, thus spearheading the community outreach efforts of OC Development Services/OC Public Works.

Communicated, both verbally and in writing, with representatives of the District Offices to address potential code-related concerns (Board of Supervisors). Analyzed current Neighborhood Preservation procedures and implemented changes when needed to improve program efficiency/effectiveness and staff morale (i.e., office hearing scheduling procedures, improved notification process, changes in rotational case assignments, etc.).

Prepared and hosted Neighborhood Preservation bi-weekly meetings to maintain staff awareness of program status, goals and accomplishments, as well as to obtain feedback from staff with regards to improving the program. Reviewed officer prepared notifications to the public and case files submitted for closure to maintain quality assurance, providing staff with assistance and direction when needed. Researched and organized additional training for members of staff to improve officer awareness and effectiveness. Responsible for annual staff member reviews, coaching up of staff, and disciplinary action towards staff as needed. Responsible for developing and maintaining the annual budget for Neighborhood Preservation, as well as overseeing contract development/operations.

Highly involved with the development and implementation of the new Land Management System and the Customer Resource Management online portal now utilized throughout OC Public Works to provide easily accessible online services to the stakeholders and visitors of Orange County.

AndersonPenna, Newport Beach, California. Senior Code Enforcement Officer. Managed overall contract and day-to-day operations of contract code staff assigned to the County of Orange. Received calls for service and investigated potential zoning, building, grading and general property maintenance code violations. Collected and documented evidence as part of code casework. Issued notices and administrative citations as needed to ensure code compliance. Prepared briefing papers and reports for review by management of the Board of Supervisors. Prepared and carried out inspection and abatement warrants. Planned, Education
B.S., Business Management,
California Coast University,
Santa Ana, CA
Business Management,
California State University,
Long Beach
Psychology, Cerritos
Community College
Licenses/Certifications
PC 832 Certificate - Rio Hondo
Community College
Certified Code Enforcement
Officer, CACEO - California
Association of Code
Enforcement Officials
Basic Certification,
SCACEO - Southern
California Association of
Code Enforcement Officials
Intermediate Certification,
CACEO - California
Association of Code
Enforcement Officials
Advanced Certification,
CACEO - California
Association of Code
Enforcement Officials
Supervisory Certification,
CACEO - California
Association of Code
Enforcement Officials
Watershed Management
Certificate, EPA -
Environmental Protection
Agency, Sacramento, CA
Affiliations
Member, California
Association of Code
Enforcement Officials
27 Years’ Experience

Page 189 of 624 ends

City of Norco
City of Norco Code Enforcement Services
prepared and participated in community meetings and clean-up events. Worked closely with County Counsel and the District Attorney’s office to host meetings, carryout civil litigation, and proceed with criminal court filings when voluntary compliance was not obtained.

Willdan, Anaheim, California. Senior Code Enforcement Officer. Managed overall contract and day-to-day operations of contract code staff assigned to the County of Orange. Received calls for service and investigated potential zoning, building, grading, and general property maintenance code violations. Collected and documented evidence as part of code casework.

Issued notices and administrative citations as needed to ensure code compliance. Prepared briefing papers and reports for review by management and the Board of Supervisors.

Prepared and carried out inspection and abatement warrants. Planned, prepared, and participated in community meetings and clean-up events. Worked closely with County Counsel and the District Attorney’s office to host meetings, carry out civil litigation, and proceed with criminal court filings when voluntary compliance was not obtained. Provided code services to the City of La Canada-Flintridge. Also, prepared community education materials pertaining to code enforcement for the City of Laguna Hills.

City of Anaheim, California. Code Enforcement Officer II. Conducted field investigations and site surveillance of residential, commercial, and industrial properties. Enforced all applicable code provisions, ordinances and statutes; issued infraction and misdemeanor citations for violations regarding zoning, litter, abandoned vehicles, weeds and debris accumulation.

Photographed evidence, interviewed potential witnesses and composed letters to ensure remedial action was taken; received complaints from citizens; issued correction notices and performed abatements when necessary. Prepared memos and investigative reports.

Responsible for the enforcement of parking violations and illegal street vendor activity.

City of Paramount, California. Code Enforcement Officer I. Conducted field investigations and site surveillance of residential, commercial and industrial properties. Enforced all applicable code provisions, ordinances and statutes; issued infraction and misdemeanor citations for violations regarding zoning, litter, abandoned vehicles, weeds and debris accumulation. Photographed evidence, interviewed potential witnesses and composed letters to ensure remedial action was taken; received complaints from citizens; issued correction notices and performed abatements when necessary. Prepared memos and investigative reports. Responsible for the enforcement of parking violations and illegal street vendor activity. Also responsible for Public Safety fleet maintenance and supervised the Los Angeles County inmates (trustees) assigned to provide maintenance services at the City’s Public Safety Substation.

Terry Cox
Continued

Page 190 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Kerry Simpson, MPA
Code Enforcement Manager
Kerry Simpson, MPA is a Willdan Code Enforcement Manager. She is a passionate and accomplished leader with extensive experience overseeing Code Compliance, Animal Services, Health Compliance, and Homeless Services. She has a proven track record in strategic planning, budgeting, and project management. Kerry has been recognized for developing innovative solutions to complex problems, cultivating strong relationships with stakeholders, and initiating impactful community engagement programs.

Previous Work Experience
City of McKinney, TX, Director of Compliance Services Oversaw all aspects of Code Compliance, Animal Services, and Health Compliance. Testified at the Building & Standards Commission and initiated demolition of substandard structures. Directed all aspects of project management including planning, budgeting, staffing, scheduling, monitoring, and reporting. Developed and implemented strategic plans to ensure organizational goals were met. Participated on Mayor's Homeless Taskforce. Mentored and coached staff members, enabling them to reach their highest potentials. Managed a COVID- 19 hotline during a time of crisis. Led cross-functional teams in the development of innovative solutions to complex problems such as homelessness. Established a proactive zoning enforcement program.

Participated in writing and enforcing a new Unified Development Code in 2022, which won an award from the APA Texas Chapter. Issued criminal citations and warrants. Member of the City's Executive Leadership Team.

American Association of Code Enforcement (AACE) Third Vice President Facilitated leadership courses for managers. Conducted a nationwide skip tracing course to help officers locate absentee property owners. Established a collaborative legislative affairs program with ICC, the Responsible Hospitality Institute, and other stakeholders.

City of Rancho Cordova, CA, Neighborhood Services Manager Spear-headed a new comprehensive code compliance program in newly incorporated city to address blight, zoning violations, illegal cannabis grows. Managed Animal services program, including investigation and conviction of animal abuse cases. Initiated comprehensive rental housing inspection program. Functioned as the City's Fair Housing Officer. Managed and reported on Community Development Block Grants (CDBG). Implemented administrative citations program. Oversaw homeless response program which including code compliance officers, police officers, a homeless navigator, and cleanup crews. Assisted in City's Legislative Affairs program including monitoring bills and collaborating with the League of California Cities and other organizations. Won California Association of Code Enforcement award for the "Most Innovative Program" for Blight Busters and the Probation Partnership. Wrote and presented new ordinances to City Council including vacant building monitoring program, rental housing inspection program, property standards code. Presented Blight Busters as a case study to the Alliance for Innovation. Participated on the City's Leadership Team.

California Association of Code Enforcement Officers (CACEO) President and Board Member Taught code enforcement and advanced code enforcement academies throughout California, including zoning. Regularly testified at the State Capitol on changes to the Health and Safety code and Code Enforcement standards. Testified at the State Senate hearings on the Ghost Ship Fire.

EDUCATION
MS, Public Administration,
National University, San Diego
BS, Business Management,
University of Phoenix
Leading Edge in High
Performance Organization,
College of Charleston
Trained in Community
Engagement by Pepperdine
University

PROFESSIONAL

CERTIFICATIONS
Certified Mediator - State of
Texas
Certified Train the Trainer -
continuing Education for
Public Officials (CEPO)
PC 832
AWARDS
City Employee of the Year, San
Jose
John Lowe Award of
Excellence (CACEO):

California Association of Code
Enforcement - Most
Innovative Program Award -
Blight Buster
California Association of Code
Enforcement - Most
Innovative Program Award -
Probation Partnership
30 Years’ Experience

Page 191 of 624 ends

City of Norco
City of Norco Code Enforcement Services
John W. Poole
Code Consultant
Mr. John Poole has 40 years of municipal government experience, which includes providing code enforcement and related services. He serves as a code enforcement consultant in our Willdan Anaheim office and provides supervisory and management services in code enforcement and other related areas. Prior to joining the Willdan team, he was employed by the City of Anaheim as Senior Code Enforcement Officer, Code Enforcement Supervisor, and Code Enforcement Manager. From 1983 to 2003, he was directly responsible for a comprehensive code enforcement program, which had a budget of approximately $3.5-million. He administered a City code-enforcement program that was responsible for a highly diverse scope of municipal, State, and Federal codes and related areas, which included land use, building, housing, public nuisance, and hazardous waste/material removal. Mr. Poole successfully developed and implemented the innovative City-sponsored community-volunteer programs, such as the antigraffiti, “Make Your Mark on the World, Not on the Wall,” “Paint Your Heart Out Anaheim,” which assists low-income elderly or disabled homeowners; and “Volunteers in Pride,” which entails public participation in code enforcement and neighborhood improvement activities.

Mr. Poole has conducted code enforcement and management seminars for the University of California, University of Wisconsin, and the California Association of Code Enforcement Officers (CACEO). He has been associated with CACEO since its inception and served four years as CACEO’s President.

Mr. Poole has demonstrated the ability to conceptualize, develop, and implement programs and/or strategies to overcome and resolve individual, committee, group, and organizational objections to the satisfaction of all parties.

Work Experience
Willdan, Anaheim, California. Code Enforcement Manager. Mr. Poole managed the Code Compliance Division for Willdan and provided contract code services to Municipalities in the western United States. The contract services varied from staff augmentation, program development and consulting. He provided service to different jurisdictions in California, Arizona and Nevada including the following government agencies; County of Orange, City of Anaheim, South Pasadena, Bradbury, Rosemead, Hawaiian Gardens, Los Alamitos, Irvine, Del Mar, La Palma, and San Juan Capistrano. Mr. Poole developed and implemented code programs, ordinances (civil citation, nuisance ordinance, rental inspection programs) and policies and procedures manuals. He Managed all contracts for service delivery and all contract employees assigned to the projects.

City of Anaheim, CA Code Enforcement Manager. Mr. Poole was responsible for managing the Code Enforcement Division for the City. He was assigned to oversee all operations and respond to all citizen concerns, City Manager complaints and Council inquiries; Prepare and monitor the Division's budget including all revenues and expenditures. John prepared regular staff reports for City Council regarding ordinance development and/or municipal code revisions. Mr. Poole provided personnel with direction, develop and update the Division's Policy and Procedure manual and verify that staff adhered to all policies established within the Division. He evaluated staff's performance on a regular basis and pursued disciplinary action when appropriate. John attended regular staff meetings; met with civic groups such as the Chamber of Commerce, Board of Realtors, Neighborhood groups and Homeowner's Associations. Mr. Poole interacted with various departments, County, State and Federal organizations when necessary.

Education
1979, BS, Administration of
Justice, California State
University, Los Angeles
Registration/Certification
California P.C. 832
P.O.S.T. Reserve Police
Officer
Affiliations
AACE, American Association
of Code Enforcement
CACEO, California
Association of Code
Enforcement Officers
Awards and Recognition
American Planning
Association – Multiple
Award Winner
California League of Cities –
Helen Putman Award
Recipient
National League of Cities –
James C. Howland Award for
Urban Enrichment
40 Years’ Experience

Page 192 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Ed Nicholls, Jr.

Code Consultant
Mr. Ed Nicholls is a Willdan Engineering code enforcement consultant with over 30 years of experience. He serves as a code enforcement consultant in our Willdan Anaheim office and provides supervisory and management services in code. Mr. Nicholls specializes in leadership training and development, and in program evaluation, development, and implementation.

Relevant Project Experience
County of Riverside, California. Code Enforcement Deputy Director. Mr. Nicholls directed the daily activities of the 85-member strong Code Enforcement and Environmental Compliance Division. With a keen attention to detail, he skillfully coordinated a spectrum of divisional programs and projects, meticulously developing and implementing a range of training initiatives tailored to the team's needs. His strategic acumen and adept collaboration with stakeholders ensured seamless alignment of divisional objectives with overarching organizational goals.

Through his proactive approach, Mr. Nicholls identified and capitalized on opportunities to optimize operations, introducing streamlined processes and innovative tools that enhanced the efficiency and impact of enforcement and compliance endeavors.

City of Chino Hills, California. Neighborhood Services Manager. Mr. Nicholls skillfully managed and supervised the day-to-day operations of the Neighborhood Services Division. With a strategic approach, they developed and executed a range of divisional training programs aimed at enhancing staff performance and capabilities. In addition, their forward-thinking vision led to the creation and successful implementation of a comprehensive training curriculum dedicated to nurturing neighborhood leadership qualities among city residents, ultimately contributing to a more empowered and engaged local community.

City of Yorba Linda, California. Senior Community Preservation Officer. Mr. Nicholls adeptly supervised the day-to-day operations of the Community Preservation Division, skillfully orchestrating the development and harmonization of a diverse array of divisional programs, codes, laws, policies, and procedures. Their remarkable leadership was evidenced by their ability to conceive and execute an array of divisional training programs, effectively enhancing the team's knowledge base and performance. Through their strategic acumen and commitment, they played a pivotal role in advancing the division's objectives and ensuring its seamless functioning.

City of Fountain Valley, California. Code Enforcement Officer II. Mr. Nicholls undertook the supervision of the Code Enforcement program, providing training to a team of two code enforcement officers, and enforcing state and local laws for enhancing the quality of life in the City's residential and commercial areas. His responsibilities encompassed identifying violations, taking necessary actions, and maintaining records of their enforcement activities. Effective communication and collaboration with other departments were key to resolving complex cases.

His strong leadership, analytical skills, and commitment to adherence underscored their role in effective code enforcement and community improvement.

City of Anaheim, California. Code Enforcement Officer II. Conducted field investigations and site surveillance of residential, commercial and industrial properties. Enforced all applicable code provisions, ordinances and statutes; issued infraction and misdemeanor citations for violations regarding zoning, litter, abandoned vehicles, weeds and debris accumulation. Photographed evidence, prepared diagrams, interviewed potential witnesses and composed letters to ensure remedial action was taken; received complaints from citizens; issued correction notices and performed abatements when necessary. Prepared memos and investigative reports.

Education
M.S., Education, California
Baptist University
B.S., Business Management,
University of Phoenix
Registration
PC 832 Certificate, Orange
County Sheriff's Academy,
Orange, CA
Basic Certification, SCACEO -
Southern California Association
of Code Officials
Intermediate Certification,
SCACEO - Southern California
Association of Code Officials
Advanced Certification, SCACEO
- Southern California
Association of Code Officials
Supervisory Certification,
SCACEO - Southern California
Association of Code Officials
Affiliations
Past Education Chair, California
Association of Code Officials,
Sacramento, CA
30 Years’ Experience

Page 193 of 624 ends

City of Norco
City of Norco Code Enforcement Services
Scott C. Barber
Code Consultant
Mr. Scott Barber brings 30 years of local government experience, creating success through innovation and strategic partnerships, coupled with a fundamental and deeply ingrained understanding that public trust is earned. Mr. Barber has extensive experience in development processes and economic development activities related to business attraction through entitlement and permitting incentives. He is an excellent communicator and presenter, with solid budgeting and finance experience.

Relevant Project Experience - Consulting
City of Huntington Beach, CA. Code Enforcement Program Evaluator. Performed a thirdparty evaluation of the City’s Code Enforcement Program seeking efficiencies for the program, including a review and suggested updates to the City’s Policy and Procedures Manual, analysis of case processing with office and field staff, statistical and trend review of caseloads and case processing techniques, and analysis/recommendations for “right sizing” code enforcement investigative responses based upon staffing and budget resources. Final Deliverable: “Findings Memorandum” with specific program recommendations.

City of Burbank, CA. Code Enforcement Program Reviewer. Onsite office/field activities evaluation, systems analysis, program alternatives and modernization, resulting in a comprehensive "road map" for long-term sustainable change.

City of Ventura, CA. Code Enforcement Program Reviewer. Created "Findings Memorandum" after review of onsite office/field functions, code enforcement policies; validating staff recommendations for City Management/Council approval.

City of Merced, CA. Code Enforcement Program Reviewer. Created a comprehensive Policies & Procedures Manual, along with findings and recommendations for program enhancements, based upon interviews with office, management, and field staff, for use by the City's Code Enforcement Task Force.

County of San Mateo, CA. Expert Witness - San Mateo Sober Living Civil Case. Served as expert witness for the County of San Mateo in defense of a federal civil rights complaint regarding housing discrimination.

Relevant Project Experience - Local Government
City of Riverside, CA. City Manager. 80 square miles, 12th largest city in California, population 308,511. Annual budget of approx.$1 billion, 2687 FTEs. Municipal services include police, fire, roads, parks, museums, libraries, development services, airport, and its own publicly owned utility (electricity and water); operates a regional water quality control plant. Responsibilities and accomplishments include:
• Revised citywide budget procedures to increase transparency in the creation and tracking of project expenditures and strategic use of General Fund reserves. • Led the stakeholder-involved design process for the $45 million reconstruction of the Riverside Convention Center.
• Created successor agency to City’s former redevelopment agency; led the City to a “Finding of Completion” from the California Department of Finance for the long-range property management of 30+ properties, and the approval of $1.57 billion in Recognized Payment Obligation Schedule (ROPS) reimbursements.
• Construction of two new City parks (Doty-Trust and Ryan Bonamino), utilizing multiple funding sources (COPs, RDA bonds, inter-fund loans) for $14M cost. • Led educational outreach for two citywide ballot measures: reauthorize a parcel tax for library services (Measure I); reauthorize transfer of water utility revenue to General Fund of $6.7 million annually (Measure A). Both measures passed by more than sixty-six percent (66%).

Education
M.B.A., Business, California
Baptist University, Riverside
B.A., Theater Arts, University
of California, Riverside
Licenses/Certifications/
Training
Created/taught the course
"Coaching and Mentoring”.

Served as a certified
interpreter for Lominger
"Voices 360 degree"
assessments.
40+ Years’ Experience

Page 194 of 624 ends
← All documents from this meeting