Cities Index.
Agenda

Norco City Council
August 6, 2025

Document
Agenda
Meeting
August 6, 2025
Body
Norco City Council
Pages
388
Original file
35.0 MB
Text extracted from the city's file for reading and search. Open the original on norco.civicweb.net. That file is the official record.

Agreement-4
and contractual liability (including, without limitation, indemnity obligations under the Contract) with limits of liability of not less than the following:
$2,000,000 per occurrence for bodily injury and property damage $1,000,000 per occurrence for personal and advertising injury $2,000,000 aggregate for products and completed operations $4,000,000 general aggregate
(ii) COMMERCIAL AUTOMOBILE LIABILITY insurance which shall be at least as broad as the most current version of Insurance Service Office (ISO) Business Auto Coverage Form CA 00 01, and include coverage for all owned, hired, and non owned automobiles or other licensed vehicles (Code 1 Any Auto) with limits of liability of not less than $1,000,000 per accident for bodily injury and property damage. (iii) WORKERS' COMPENSATION insurance as required under the California Labor Code.
(iv) EMPLOYERS’ LIABILITY insurance with limits of liability of not less than $1,000,000 each accident, $1,000,000 disease policy limit and $1,000,000 disease each employee.
(v) BUILDERS RISK (Course of Construction) insurance in an amount equal to the completed value of the project with no coinsurance penalty provisions. (Only required if the project includes new construction of a building; or renovation of, or addition to, an existing building.)
(vi) CONTRACTORS POLLUTION LIABILITY (Unless waived in
writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is required for all environmental and water remediation work and for all work transporting fuel. Unless waived in writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is also required for demolition, renovation, HVAC, plumbing or electrical (including, without limitation, lighting) work on any structure built prior to the year 1990.) insurance with limits of liability of not less than the following:
$1,000,000 per occurrence or claim
$2,000,000 general aggregate per annual policy period
In the event Contractor purchases an Umbrella or Excess insurance policy(ies) to meet the minimum limits of insurance set forth above, this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies).

Should this Contract involves any lead based, mold or asbestos environmental hazard, either the Automobile Liability insurance policy or the Contractors Pollution Liability insurance policy shall be endorsed to include Transportation Pollution Liability insurance covering materials to be transported by Contractor pursuant to the Contract.

In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental hazards. In the event this Contract involves any asbestos environmental hazard (e.g., asbestos remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for asbestos environmental hazards. In the event this Contract involves any mold environmental hazard (e.g., mold remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for mold

Page 210 of 388 ends

Agreement-5
environmental hazards and “microbial matter including mold” within the definition of “Pollution” under the policy.

Contractor shall be responsible for payment of any deductibles contained in any insurance policies required hereunder and Contractor shall also be responsible for payment of any self-insured retentions. Any deductibles or self-insured retentions must be declared to, and approved by, the City Manager or his/her designee in his/her sole discretion. At the option of the City Manager or his/her designee, either (i) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees and agents; or (ii) Contractor shall provide a financial guarantee, satisfactory to the City Manager or his/her designee in his/her sole discretion, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall City be responsible for the payment of any deductibles or self-insured retentions.

All policies of insurance required hereunder shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after 30 calendar day written notice has been given to City. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, Contractor shall furnish City with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for City, Contractor shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than 15 calendar days prior to the expiration date of the expiring policy.

The General Liability and Automobile Liability insurance policies shall be written on an occurrence form. The Contractors Pollution Liability insurance policy shall be written on either an occurrence form, or a claims-made form. The General Liability (including ongoing operations and completed operations), Automobile Liability and Contractors Pollution Liability insurance policies shall name City, its officers, officials, employees and agents as an additional insured. All such policies of insurance shall be endorsed so Contractor’s insurance shall be primary and no contribution shall be required of City, its officers, officials, employees and agents. The Builders Risk (Course of Construction) insurance policy shall be endorsed to name the City as a loss payee. Any Workers’ Compensation insurance policy shall contain a waiver of subrogation as to City, its officers, officials, employees and agents. The coverage(s) shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees and agents. If Contractor maintains higher limits of liability than the minimums shown above, City requires and shall be entitled to coverage for the higher limits of liability maintained by Contractor.

Claims-Made Policies - If any coverage required is written on a claimsmade coverage form:
(i) The retroactive date must be shown, and must be before the effective date of the Contract or the commencement of work by Contractor. (ii) Insurance must be maintained and evidence of insurance must be provided for at least 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iii) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the effective date of the Contract, or work commencement date, Contractor must purchase extended reporting period coverage for a minimum of 5 years after completion of the work or termination of the Contract, whichever first occurs.

Page 211 of 388 ends

Agreement-6
(iv) A copy of the claims reporting requirements must be submitted to City for review.
(v) These requirements shall survive expiration or termination of the Contract.

Contractor shall furnish City with all certificate(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the City’s Risk Manager or his/her designee in his/her sole discretion prior to City’s execution of the Contract and before work commences.

Upon request of City, Contractor shall immediately furnish City with a complete copy of any insurance policy required under this Contract, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Contract.

If at any time during the life of the Contract or any extension, Contractor or any of its subcontractors fail to maintain any required insurance in full force and effect, all work under this Contract shall be discontinued immediately, and all payments due or that become due to Contractor shall be withheld until notice is received by City that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to City. Any failure to maintain the required insurance shall be sufficient cause for City to terminate this Contract. No action taken by City hereunder shall in any way relieve Contractor of its responsibilities under this Contract.

The fact that insurance is obtained by Contractor shall not be deemed to release or diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this Contract. The duty to indemnify City shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Contractor, its principals, officers, agents, employees, persons under the supervision of Contractor, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them.

In the event of a partial or total destruction by the perils insured against of any or all of the work and/or materials herein provided for at any time prior to the final completion of the Contract and the final acceptance by the City of the work or materials to be performed or supplied thereunder, the Contractor shall promptly reconstruct, repair, replace, or restore all work or materials so destroyed or injured at his/her sole cost and expense. Nothing herein provided for shall in any way excuse the Contractor or his/her insurance company from the obligation of furnishing all the required materials and completing the work in full compliance with the terms of the Contract.

If Contractor should subcontract all or any portion of the services to be performed under this Contract, Contractor shall require each subcontractor to provide insurance protection in favor of City, its officers, officials, employees and agents in accordance with the terms of each of the preceding paragraphs, except that the subcontractors' certificates and endorsements shall be on file with Contractor and City prior to the commencement of any work by the subcontractor.

3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In constructing the Project, the Contractor shall at

Page 212 of 388 ends

Agreement-7
all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.2.11 Bonds. (NOT APPLICABLE)

3.2.11.1 Performance Bond. Contractor shall execute and provide to City concurrently with this Agreement a Performance Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City.

3.2.11.2 Payment Bond. Contractor shall execute and provide to City concurrently with this Agreement a Payment Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by City.

3.2.11.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 14 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least fourteen (14) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this section are accepted by the City. To the extent, if any, that the total compensation is increased in accordance with the Agreement, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. To the extent available, the bonds shall further provide that no change or alteration of the Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Agreement for cause.

3.2.11.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the City. If a California admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.3 Fees and Payments.

3.3.1 Compensation. Contractor shall receive compensation, including authorized reimbursements, for all construction services rendered under this Agreement at the rates set forth in Exhibit B attached hereto and incorporated herein by reference. Extra work

Page 213 of 388 ends

Agreement-8
may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

3.3.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement which indicates work completed by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

3.3.3 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement.

Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

3.3.5 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.4 Accounting Records.

3.4.1 Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

Page 214 of 388 ends

Agreement-9

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services which have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Agreement except for cause.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request.

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the follow address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor:

Superior Pavement Markings, Inc.
5312 Cypress Street
Cypress, CA 90630
Attention: Darren Veltz- President
City:

City of Norco
2870 Clark Avenue
Norco, CA 92860
Attention: Director of Public Works
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the US Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.4 Attorney’s Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney’s fees and all other costs of such action.

Page 215 of 388 ends

Agreement-10

3.5.5 Indemnification. To the furthest extent allowed by law including California Civil Code section 2782, CONTRACTOR shall indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage) incurred by CITY, CONTRACTOR or any other person, and from any and all claims, demands and actions in law or equity (including attorney's fees and litigation expenses), arising or alleged to have arisen directly or indirectly out of performance of this Contract. CONTRACTOR'S obligations under the preceding sentence shall apply regardless of whether CITY or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of CITY or any of its officers, officials, employees, agents or volunteers.

If CONTRACTOR should subcontract all or any portion of the work to be performed under this Contract, CONTRACTOR shall require each subcontractor to indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers in accordance with the terms of the preceding paragraph.

This section shall survive termination or expiration of this Contract.

3.5.6 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.7 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County.

3.5.8 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.9 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project.

3.5.10 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.11 Assignment or Transfer. Contractor shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.12 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be work days (Monday through Friday, excluding holidays). All references to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and

Page 216 of 388 ends

Agreement-11
paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content or intent of this Agreement.

3.5.13 Amendment; Modification. No supplement, modification or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

3.5.15 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.5.16 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement.

Contractor further agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.18 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake selfinsurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.20 Authority to Enter Agreement. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.21 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

Page 217 of 388 ends

Agreement-12

3.6 Subcontracting.

3.6.1 Prior Approval Required. Contractor shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

Name of Contractor: Superior Pavement Markings, Inc.
*By:
________________________________________________
Signature
Darren Veltz, President
NOTE: SIGNATURES OF CORPORATE OFFICIALS MUST BE NOTARIZED.

Attach Certificate of Notary Acknowledgement
OWNER: CITY OF NORCO, a municipal corporation
*By:
________________________________________________
Greg Newton - Mayor
ATTEST:
________________________________________________
Dana Roa, CMC, City Clerk
APPROVED AS TO FORM:
________________________________________________
Colin Burns, City Attorney

Page 218 of 388 ends

Agreement-13

EXHIBIT A
Scope of Annual On-Call Street Striping and Pavement Marking Services Fiscal Years 2025-26 Through 2027-28
The maintenance services agreement will consist of furnishing all labor, materials, and equipment to perform all work necessary and incidental to: Provide Street Striping and Pavement Marking Services in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) Standard Specifications (latest edition) unless otherwise specified, and the City of Norco Municipal Codes, specifications and contract documents. The general items of work to be done hereunder consist of street striping and legend marking with paint and thermoplastic materials, removal of existing striping and pavement legends, including crosswalks, direction arrows, stop bars and the installation of raised dot reflective markers, and all related work to the satisfaction and acceptance of the Director of Public Works or his designee, pursuant to the rates set forth in Exhibit B of this Agreement.

The services shall be performed in accordance with the Standard Specifications for Public Works Construction (Green Book), latest edition, including all current supplements, addenda, and revisions thereof (hereinafter referred to as “Standard Specifications”) incorporated herein by this reference. Any provisions which supplement or modify the Standard Specifications are attached hereto as Special Provisions and incorporated herein by this reference.

Page 219 of 388 ends

Agreement-14
Exhibit B
Compensation for Annual On-Call Street Striping
and Pavement Marking Services Fiscal Years 2025-26 through 2027-28 (see Proposal)

Page 220 of 388 ends

Agreement-15

GENERAL LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ Policy Number _____________________

2. Policy Term (From) _______________ (To)________________ Endorsement Effective Date ______________________________________

3. Named Insured _______________________________________________

4. Address of Named Insured
_____________________________________________________________ _____________________________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________________ /_____________________________

6. Deductible or Self-Insured Retention (Nil unless otherwise specified):
______________________________________________

7. Coverage is equivalent to:

Comprehensive General Liability Form GL0002 (Ed. 1/73)
______________________________________________
Commercial General Liability “Occurrence” Form CG0001
______________________________________________

8. Bodily Injury and Property Damage Coverage is:
____________________________________”occurrence”
Note: The City of Norco standard insurance requirements specify “occurrence” coverage. “Claims-made” coverage is not acceptable. If commercial general liability form or equivalent is used, the general aggregate must apply separately to this location/project or the general aggregate must be twice the occurrence limit.

Page 221 of 388 ends

Agreement-16

9. Description of Project:

ANNUAL ON-CALL SERVICES FOR STREET STRIPING

AND PAVEMENT MARKING
(FISCAL YEARS 2025-2026 THROUGH 2027-2028)
The general items of work to be done hereunder consist of:

The maintenance services agreement will consist of furnishing all labor, materials, and equipment to perform all work necessary and incidental to: Provide Street Striping and Pavement Marking Services in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) Standard Specifications (latest edition) unless otherwise specified, and the City of Norco Municipal Codes, specifications and contract documents. The general items of work to be done hereunder consist of street striping and legend marking with paint and thermoplastic materials, removal of existing striping and pavement legends, including crosswalks, direction arrows, stop bars and the installation of raised dot reflective markers, and all related work to the satisfaction and acceptance of the Director of Public Works or his designee, pursuant to the rates set forth in Exhibit B of this Agreement.

B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. As respects any work performed on the above described Project, the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, and volunteers are included as insured with regard to damages and defense of claims arising from: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, or (c) premises owned, leased, or used by the Named Insured.

2. CONTRIBUTION NOT REQUIRED. As respects: (a) work performed by the Named Insured on the above described Project for or on behalf of the City of Norco; or (b) products sold by the Named Insured to the City of Norco for use on the Project; or (c) premises leased by the Named Insured from the City of Norco, the insurance afforded by this policy shall be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers; or stand in an unbroken chain of coverage excess of the Named Insured’s schedule underlying primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage at least as broad as:
(1) Insurance Services Office Form Number GL 0002 (Ed. 1/73), Comprehensive General Liability Insurance and Insurance Services

Page 222 of 388 ends

Agreement-17
Office form number GL 0404 Broad Form Comprehensive General Liability endorsement; or
(2) Insurance Services Office Commercial General Liability Coverage, “Occurrence” Form CG 0001; or
(3) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Sections (1) and (2).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respects to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
______________________________
(Telephone Number)

Page 223 of 388 ends

Agreement-18
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to (Print/Type Name)
bind the below-listed insurance company and by my signature hereon do so bind this company.
____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________________________

Page 224 of 388 ends

Agreement-19

AUTOMOBILE LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement #_____________________

1. Insurance Company _____________________________________________ Policy Number _____________________

2. Policy Term (From)________________(To) _______________ Endorsement Effective Date ___________

3. Named Insured________________________________________________

4. Address of Named Insured________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________ /_____________________________________

6. Deductible or Self-Insured Retention
(Nil unless otherwise specified):
$____________________________________________________________ B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. The City of Norco, its elected or appointed officers, officials, consulting engineers, employees and volunteers are included as insured with regard to damages and defense of claims arising from: the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers.

Page 225 of 388 ends

Agreement-20

2. CONTRIBUTION NOT REQUIRED. As respects work performed by the Named Insured for or on behalf of the City of Norco, the insurance afforded by this policy shall: (a) be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers; or (b) stand in an unbroken chain of coverage excess of the Named Insured’s primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage to the Named Insured at least as broad as:
(1) Insurance Services Office form number CA 00001 (Ed. 1/78), Code 1 (“any auto”) and endorsement CA 0025.
(2) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Section (1).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage, or against whom a claim is made or a suit is brought, except with respect to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

Page 226 of 388 ends

Agreement-21
C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
____________________________________________________
(Telephone Number)
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to (Print/Type Name)
bind the below-listed insurance company and by my signature hereon do so bind this company.
____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________

Page 227 of 388 ends

Agreement-22
WORKER’S COMPENSATION/EMPLOYER’S LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5678
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ (“the Company”)
Policy Number _________________________________________________

2. Effective Date of this Endorsement ________________________________

3. Named Insured_________________________________________________

4. Employer’s Liability Limit (Coverage B)______________________________ _____________________________________________________________ B. POLICY AMENDMENTS
In consideration of the policy premium and notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:
(1) Cancellation Notice. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.
(2) Waiver of Subrogation. The Insurance Company agrees to waive all rights of subrogation against the City of Norco, its elected or appointed officers, officials, agents and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the City of Norco.

Page 228 of 388 ends

Agreement-23
C. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, _______________________, warrant that I have authority to bind (Print/Type Name)
the below-listed insurance company and by my signature hereon do so bind this company.

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original signature required on endorsement furnished to the City of Norco) ORGANIZATION: ____________________________________________________ TITLE: ____________________________________________________ ADDRESS: ____________________________________________________ TELEPHONE: ____________________________________________________

Page 229 of 388 ends
Page 230 of 388 ends
Page 231 of 388 ends
Page 232 of 388 ends
Page 233 of 388 ends

City Council

STAFF REPORT
Date: August 6, 2025 Agenda Item:

3.G.

To: Honorable Mayor and City Council Members
From: Sam Nelson, Interim Public Works Director
Prepared By: Sam Nelson, Interim Public Works Director
Department: Public Works
SUBJECT:

Acceptance of Proposal and Award of Multi-year Contract for Water System Valve and Hydrant Assessment Services
RECOMMENDATION:

Accept the proposals submitted for professional services to provide Water System Valve and Hydrant Assessment Services, award a three-year contract to Xylem Dewatering Solutions Inc., dba Wachs Water Services and authorize the Mayor to execute the contract in the amount not-to-exceed $180,000 annually.

SUMMARY:

Staff is seeking City Council approval to accept the multi-year proposal submitted by Xylem Dewatering Solutions, Inc. dba Wachs Water Services for professional services to provide Water System Valve and Hydrant Assessment services to the City of Norco.

BACKGROUND:

The City of Norco owns and operates a potable water system designed to provide reliable high-quality drinking water to its customers. The infrastructure that makes up the water system includes an estimated 122 miles of pipeline, 7,500 customer services, 2,777 valves and 1,440 hydrants. In order to properly maintain the water system to acceptable performance levels the Public Works Department should have standard operating procedures that outline a management plan for the testing and maintenance of all of its valves and hydrants.

On June 16, 2025, the City issued a Request for Proposals (RFP) for a multi-year Water System Valve and Hydrant Assessment Services with a total of two (2) bids (See Bid Summary). Staff reviewed the proposals and has determined that Wachs Water Services can successfully provide the level of services required at a reasonable cost (See Proposal). Overall, staff was very pleased with the level of work, report details and

Page 234 of 388 ends

overall communication provided by Wachs Water Services during the term of the previous agreement.

FISCAL IMPACT:

The proposed Water System Valve and Hydrant Assessment service contract is funded from the Water Fund (124.804.34100) in the amount not-to-exceed $180,000 annually.

Funding for this contact is included in the FY 2025-26 Operating Budget.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Direction #5 - Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Joshua Calhoun, Finance Director Approved by: Lisette Free, City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Bid Summary
Proposal
Contract Agreement - Wachs

Page 235 of 388 ends

SUMMARY SHEET

WATER VALVE AND HYDRANT ASSESSMENT SERVICES

ITEM QUANTITY UNIT DESCRIPTION
1 1 EA
Perform Water Valve Assessment, Testing and Survey including GPS 2 1 EA
Raise Valve Boxes to Grade in Dirt, Grass, Snd or Gravel Areas (<=12") 3 1 EA Raise Valve Boxes to Grade in Asphalt Paved Areas (<=12")4 1 EA Mobilization5 1 EA Perform Fire Hdrant Assessment, Testing and Survey including GPS 6 1 EA
Perform Large Water Valve Assessment, Testing and Survey including GPS: Valves (>=16") 7 1 EA
Perform Reclaimed System Water Valve Assessment, Testing and Survey including GPS 8 1 EA
Perform GPS and Documentation of non-operated appurtenances 9 1 EA Hourly Crew Rate
$13.60
$249.00

UNIT CHARGE UNIT CHARGE
$200.00
$500.00
$66.05
$244.00
$63.20
Valve King, Inc.

Xylem Dewatering Solutions,
Inc. dba Wachs Water
Services
$99.00
$250.00$400.00
$2,500.00
$110.00$250.00
$99.00$15.00
$250.00
$63.20
$102.00

Page 1 of 1 ends
Page 236 of 388 ends

Annual On-Call Valve & Hydrant
Assessment Services
Fiscal Years 2025-26 through 2027-28
07/14/2025
Prepared for:

City of Norco
Public Works Department
2870 Clark Avenue
Norco, CA 92860

Page 237 of 388 ends

July 16, 2025
Attn: Sam Nelson
City of The City
Public Works Department
2870 Clark Avenue
1RUFR, CA 92860
RE: Response to Water Valve and Hydrant Assessment Services FY 2025-26 through 2027-28 Dear Mr. Nelson,
Xylem Dewatering Solutions Inc., dba Wachs Water Services (a Xylem brand), is pleased to submit our proposal for the City of Norco. We believe we are a strong candidate for the Water Valve & Hydrant Assessment for your city. We understand the significance of this project.

The City of Norco desires to initiate a Water Valve and Hydrant Assessment Services Agreement which serves three primary purposes. First, to evaluate and improve the operability of valves in the water distribution system through hands on field activities, second, to document, integrate and analyze locational, operational and physical information of valves in the water distribution system through professional services activities and third to define and refine the scope and value of an ongoing system wide program through consulting activities.

As you will see with our references that we have provided, we are extremely familiar with valve and hydrant condition assessment programs. Most notably, we are very familiar with the City of Norco’s water system, as Wachs Water Services has been providing our services for the city since 2014 by completing assessments and repairs to the city’s system wide inventory of valves and hydrants.

As a company we have verifiably assessed and exercised more than a million and a half valves, performed leak detection surveys on over 20,000 miles of main and have over 300,000 hydrant inspections to date. We have developed a thorough understanding of what is required at each asset to perform all the work listed under this solicitation. There will be no surprises for our staff or our management.

Wachs Water Services managers and technicians are provided with the best training, certification, and licensing program in the industry. With numerous trained and experienced technicians, a wide array of equipment and established detailed work processes, Wachs Water Services has more capacity to do this work than any other service provider who specializes in this type of work.

In this proposal you will find we have provided detailed project descriptions of nearly identical scope for your consideration. Our proposal shows that our project and staff experience, our experience working on distribution systems across North America, along with nearly two decades of performing these services successfully in more than 400 utilities, distinctively qualifies the Wachs Water Services team as the most experienced and the right choice to deliver them to the city of Norco.

Page 238 of 388 ends

Wachs Water Services is a brand of Xylem Inc., a 22,000-employee company headquartered in Washington D.C. with locations all over the U.S. Our annual revenue for 2024 was $8.6 billion.

We hope that you find our qualifications and experience the ideal fit for this important partnership. We assure you that we will not only deliver comprehensive results, data, and information but also successfully complete these services that exceed your satisfaction.

Please note, this proposal shall remain valid for a period of 60 days from the date of submittal. Wachs Water Services acknowledges the receipt of Addendum #1 and Q and A Set 1.

The Wachs Water Services team appreciates the opportunity to submit our proposal, and we are looking forward to the opportunity to continue to work with your staff on this important project.

Best regards,
Pete Olson, Jr
Pete Olson, Jr., Sr. Analyst, Project Management
8200 Austin Ave, Morton Grove, IL 60053
M: 847.691.3008
[email protected]

Page 239 of 388 ends

Table of Contents
Work Plan/Work Organization....................................................................................................... 5 Scope of Services .......................................................................................................................... 7 Qualifications of Company & Personnel (Experience) .............................................................. 23 Approach to Safety Measures .................................................................................................... 20 Reasonableness of Cost & Price ................................................................................................ 36

Page 240 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 5 ends

Work Plan/Work Organization
Valve Assessment Management
A valve evaluation and repair program will proactively increase the efficiency and control of your water distribution system -- reducing the cost and consequences of system failures (breaks and leaks). This program will save both operating costs and capital investment for the City of Norco while increasing customer convenience and water quality.

Wachs Water Services will develop, plan, and execute a program that will deliver measurable, immediate, and sustainable results the city is needing to be surveyed. The valve evaluation and repair program to be executed will leverage the processes developed by Wachs Water Services during previous small valve programs which have delivered clear and measurable dollar savings and risk reduction for our customers.

Wachs has performed more valve inspections than any company in the United States specializing in this type of work.

The success of this project rests squarely on the company’s experience. Wachs Water Services’ extensive work in this field ensures that our team will carry out each task completely, on time, and on budget, and at the expected level of quality. Knowledge is gained through successful experience; Wachs has acquired more knowledge from an operational, engineering, technology, and information services perspective than any other firm engaging in this work.

Hydrant Management
Wachs Water Services’ understanding of hydrant management is based on our extensive knowledge gained through the completion of hundreds of successful hydrant assessment projects. Wachs Water Services has verifiably performed more than 300,000 hydrant related activities. These activities involve the inspection, flow testing, and rehabilitation of hydrants.

The City of Norco is strategically implementing this program to maximize the effectiveness and efficiency of its inventory of water main fire hydrants. Wachs Water Services will deliver for the city the following field services which serve three primary purposes:
x To evaluate and improve the operability of fire hydrants and auxiliary valves in the water distribution system through hands-on field activities
x To document, integrate, and analyze location, operational, and physical information of hydrants and auxiliary valves in the water distribution system through professional services activities x To define and refine the scope and value of an ongoing system wide program through consulting activities
x To collect data on the performance of the water distribution system The specific objectives of this program are:
x Locate, identify, and access and record location, appearance, accessibility, and functionality data for each hydrant
x Create a deliverable database allowing hydrant data to be known and readily available and recreatable by City personnel

Page 241 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 6 ends

x Inspect and operate hydrants to ensure its ability to operate and fully “flow” upon demand with adherence to the AWWA M-17 manual, NFPA 291, and ISO requirements x Compile fire hydrant information collected via an online/web-based database with hard copy reproduction capabilities
x Perform analysis of condition and criticality of each fire hydrant Analysis will factor in the size of the water main that feeds the fire hydrant, proximity of critical services, location of the fire hydrant in relation to roads or other structures, location of the fire hydrant in relation to water production plants pump stations and/or water towers/storage tanks, and actual operability of the fire hydrant.

The scope of this program is designed to achieve the City’s objectives while minimizing the direct impact on Norco resources. At the completion of the program, Wachs Water Services will provide a detailed analysis of the value of the fire hydrant flow testing and inspection program and sustainable recommendations to the city.

Plan Project
Prior to beginning assessment activities, Wachs Water
Services will work with the City of Norco to document a project plan that captures the details of the program such as overall project approach, how valve exceptions will be addressed, torque management, and data collection.

Daily, weekly, and monthly communication
responsibilities will be defined, as well as procedures to be followed in the case of an emergency such as valve
failure or major water loss.

The City of Norco will provide a geodatabase to include valves, hydrants, and water mains for Wachs Water
Services to create ProjectTracker™ —a web-based
application designed to provide field personnel with the GIS-based spatial location of each asset they are visiting, as well as surrounding assets. Asset attributes such as size, valve type, and asset ID are also available by clicking on an individual valve on the map.

The project plan will identify critical or sensitive valves, such as stub valves, boundary valves, single line feeds and critical valves / critical facilities.

Each valve will be identified by its corresponding identification number. In cases where asset IDs are not available, Wachs will create a temporary unique identification number for each asset prior to project startup.

GPS coordinate data will be field collected while onsite.

In conjunction with the city, Wachs Water Services will lay out a plan, sequence and schedule to perform valve and hydrant assessments over a one-year period.

Currently, Wachs Water Services does not plan on using subcontractors for this project.

Page 242 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 7 ends

Scope of Services
Valve Scope of Services
Locate Valve
Wachs Water Services will locate all water distribution valves using the following guidelines:
x Wachs Water Services will search for all valves visually using the GIS data provided. x Wachs Water Services will search for water valves shown, but not identified by visual inspection, using a magnetic locator, probing rods, or other tools. x For valves located, Wachs Water Services will deliver sub-foot GPS coordinates for each valve included in this program. This level of data accuracy guarantees that specific observations regarding the locational, operational, or mechanical characteristics of a given valve are associated with the correct record.
x If the valve cannot be found after searching for fifteen minutes, the valve will be labeled “cannot locate.” A work order will be created to capture a mapping grade GPS position at the location where searched. The unlocated valve will be treated and invoiced as a standard valve assessment.

It is expected that all valves to be assessed are accessible by vehicle. If equipment must be transported to the valve site unsupported by a vehicle, an additional fee may be necessary.

Identify Valve
All water valves encountered in this program will be given a unique specific valve number and be GPS mapped; the attribute data will be delivered in a database compatible with Norco ’s existing data schema. Coordinate data shall be field collected with autonomous GPS readings and subsequently differentially corrected unless real-time corrections are used. Wachs Water Services may further refine positions through filtering and inspection to eliminate noise, problematic satellite geometry, and multi-path degradation.

Access Valve
The valve cover shall be removed by Wachs Water Services to access the valve. If, after attempting to remove the valve cover, the cover is “stuck”, the cover will be broken, the valve accessed, and the cover replaced.

Replacement valve box lids are to be provided by the City of Norco.

Clean Out Valve Box/Vault
Wachs will vacuum debris or pump out water from the box/vault to allow access to the valve operating nut and bonnet bolts where possible. In every case, the operating nut must be exposed and clearly visible (not under water or debris) when the valve is exercised. To provide this service, Wachs Water Services will

Page 243 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 8 ends

provide a vacuum and water pump with every work crew. The City of Norco will provide a location to discard spoils vacuumed out of valve structures.

Inspect Valve
Wachs Water Services will conduct a visual inspection of the valve and valve structure. This inspection will be conducted from street level and is intended to discover discrepancies that are readily visible from above ground. The specific inspection information to be captured is noted in the Project Deliverables section of this document.

Exercise Valve
Wachs Water Services will exercise each valve for a
minimum of two cycles (exercise is defined as a full
cycle, from open to shut, to open again). All valves
will be exercised with the minimum torque required to
minimize the possibility of damaging the valves.

Wachs may utilize a microprocessor-controlled valve
turner on larger valves or valves that are initially
difficult to turn. At project startup, Wachs Water
Services will share our operating guidelines for the
following situations:
x 4” and smaller gate valves
x Butterfly valves of various sizes
x 6” to 12” gate valves
x 16” and larger gate valves that are not geared
x 16” and larger geared valves
x Controlling torque using hydraulic valveturning devices x Valves found in the wrong position
x Valves that do not cycle at the proposed torque limit x Large valves with inoperable bypass valves
Valve Marking
Valve lid covers will be marked with blue paint, as the inspection and exercising process is completed. This mark is intended to provide field evidence of work completed at an individual valve and will also assist any future crew in locating the valve in a timely manner.

Minor Valve Repairs
The Contractor will complete minor repairs as they are encountered throughout this program. Minor repairs are defined as repairs that can return a valve to full operability and do not require backhoe excavation or Valve Size Non-Geared Bevel Geared Spur Geared Butterfly 2 inch 225
4 inch 225
6 inch 225
8 inch 225
10 inch 225
12 inch 225 132 123
14 inch 225 75 118
16 inch 225 162 118
18 inch 225 162 144
20 inch 300 177 157 300
24 inch 325 127 120 300
30 inch 450 177 167 300
36 inch 550 162 156 300
42 inch 700 206 199 300
48 inch 800 235 227 300
54 inch 850 240 227 300
60 inch 900 250 300
72 inch 300
96 inch 300
Maximum Industry Standard Torque Limit Guidelines (in ft#'s)

Page 244 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 9 ends

breaking the pressure barrier of the water system. While many different repairs may be necessary in order to restore valves to full operability, the Contractor is to only complete the minor repairs noted below. x Raising valve boxes in asphalt
o Locate the paved over valve, cut asphalt (small cut), jackhammer down to the cover, apply risers to raise to existing street level, backfill with compacted material and patch with cold patch material.

Materials (risers and cold patch) are to be provided by the utility x Raising valve boxes in dirt
o Locate the buried valve, dig down to the cover, apply risers to raise to existing ground level, backfill with compacted soil. Materials (risers) are to be provided by the utility Out of Position Valve Protocol
Out of position valves create unintended dead ends and water quality problems requiring hydrants to be flushed when they are re-opened. The City of Norco may choose to review out of position valves and request Wachs Water Services open these valves to improve system hydraulics. Hydrants may be required to be flushed under these conditions and will be manually documented; these activities are included in the hourly crew rate for additional services. Prior to the startup of field operations, Wachs Water Services and the City will agree to a standard operating protocol to be executed when out of position valves are encountered for both open and closed valves.

Seized Valves
If a valve does not cycle at the industry standard torque limit, Wachs Water Services will stop operation and address this as a seized or frozen valve work order to allow the city to determine criticality. To work with frozen valves, Wachs Water Services will only operate the valve turning equipment to a maximum level of torque as specified by the torque limits below. Should Wachs Water Services be unable to free the valve at this torque limit, the valve will be considered “frozen” and reported to the city. If requested by the city, Wachs Water Services can apply additional methods and/or additional torque to free up the frozen valve.

Hydrant Scope of Services
Locate Hydrants and Auxiliary Valves
Norco will provide Wachs Water Services with a minimum of two copies of the most current water distribution maps for the project area. Wachs Water Services will locate all water distribution assets using the following guidelines. x Wachs Water Services will search for all assets visually using the maps provided.
x Wachs Water Services will search for water assets shown, but not identified by visual inspection, using magnetic locator, probing rods, and other tools.
x If the asset cannot be located after searching for fifteen minutes, it will be identified in the database as “Cannot Locate”, documented as a work order, creating a mapping grade GPS position at the location where searched and otherwise treated as a standard assessment.

Page 245 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 10 ends

Identify Assets
Each water distribution asset record will be identified by its corresponding GIS identification number. In cases where Asset IDs are not available, Wachs Water Services will create a temporary asset identification number that will be agreed upon before field operations commence.

Access Hydrants
Wachs Water Services will clear obstructing plant growth (weeds, grass) from an area two feet surrounding the base of the fire hydrant prior to operating.

Inspect Hydrants
Wachs Water Services will execute a visual inspection of the asset. This inspection will be conducted from street level and is intended to discover discrepancies that are readily visible from above ground. At the start of the project, Wachs Water Services will review a detailed list of observations (i.e., attribute data) to be made and collected at valve and hydrant assets during this program.

Operate Hydrants
Wachs Water Services will be required to operate all auxiliary valves and hydrants, fully exercising them and performing minor work order repairs while making numerous observations about the condition, operability, and functionality of each asset. Observations are to be meticulously documented electronically while linking them directly to earth coordinates via GPS. Wachs Water Services will operate underneath the guidelines set forth in this agreement. Due to potential condition and deterioration of assets, Wachs Water Services will not be held liable for any assets that fail or break or the consequences of such failures during operating procedures due to pre-existing conditions. Any assets that fail or break during operation will be repaired or replaced by the city.

Wachs Water Services will exercise each auxiliary valve a minimum of two full cycles and operation and exercising will continue until operating torque stabilizes without measurable decreases and valve turn count stabilized with measurable increases. Exercise is defined as a full cycle, from open to shut to open again. All auxiliary valves will be exercised at the lowest operational torque. More explicitly, torque will be reduced immediately following the initial movement of the valve to the lowest foot-pound required to continue moving the valve.

Fire Hydrant Testing and Exercising
Wachs Water Services will conduct and document a 21-point hydrant inspection in accordance with AWWA and NFPA standards. Wachs Water Services will mechanically test the pressure and flow of each fire hydrant. The mechanical inspection includes removing, greasing, and re-installing the existing caps; slowly opening and bleeding the air out of the fire hydrant pressurizing the barrel at full system pressure; and noting discrepancies.

The pressure test will be conducted with the fire hydrant charged at full system pressure, and any leakage will be documented and static pressure recorded. The flow test will be conducted by opening the cap, affixing a diffuser, slowly opening the fire hydrant to the fully open position observing velocity pressure (pitot pressure) and residual pressure on the same hydrant.

Page 246 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 11 ends

At this time the fire hydrant will be slowly closed, drainage of the fire hydrant will be observed, caps will be replaced, and the area will be fully restored. The specific operational testing information to be documented is noted in the documentation section.

Minor Work Order Repairs
Wachs Water Services can perform minor repairs or preventative maintenance such as:
x Greasing existing caps and nozzles threads
x Lubricate operating nut, such as adding oil or grease according to manufacturer recommendations x Snug auxiliary valve packing leaks (if valve is in scope) x Auxiliary valve box structural repairs, raises, re-alignments (if valve is in scope) Due to the potential condition or deterioration of assets in the field that may or may not have been maintained, Wachs Water Services will not be held liable for any assets that fail, break or the consequences of such failures during the operating procedures due to pre-existing conditions. Any assets that fail or break during operation will be documented as a work order and should be repaired or replaced by the utility.

Equipment
Wachs Water Services is the largest known purveyor
specializing in water distribution system valve and fire hydrant preventive maintenance programs, and, to that end, owns and operates highly specialized equipment for the inspection, exercising and documentation of water distribution valves and hydrants. Our trucks are equipped with arrow board/signage and warning lights. We retire equipment and procure new equipment on an ongoing basis. Our crews have many years of experience performing this exact work with these specific tools.

If any equipment assigned to the project needs repairs, we have numerous back up vehicles with valve & hydrant equipment to supplement so work will never be interrupted.

The following are some examples of specialized equipment that would be used in support of the project:

Project Field Trucks
x Heavy Duty Vehicle (F-550 models) with ½ rear doors
x Medium Duty (MD) Vehicle (F-350 or 3500 models) with ½ rear doors
Valve Management Equipment

Page 247 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 12 ends

x E.H. Wachs TM7-DT or ERV-750 Truck Mounted Valve Exerciser x E.H. Wachs PowerDrive Valve Exerciser
x Metal Detector
x Wachs Hydraulic Pump 350 GPM
x 3,000 PSI Pressure Washer
x Vacuum
Hydrant Management Equipment
x Hydrant Flow Test Equipment
x Cap Mounted Static and Residual Pressure Gauge
x Pollard Water LPD 250
Personal Protective Equipment (PPE) & Confined Space Entry Equipment (CSE) x Masks
x Gloves
x Eye protection
x Safety vest
x CSE fencing and signage
x Tripod
x Tripod winch
x Fall restraints
x Harness
x Ladders
Traffic Control Equipment
x Arrow board
x Cones
x Traffic signs/flags
Additional Tools and Supplies
x Pipe wrench
x Hydrant wrench
x Hedge clippers
x Diagonal side cutters
x Cotter pin removal tool
x Lubri-plate grease
x Small paint brush
x Pressure gauge calibrator
x Field Use Inspection and
Maintenance Forms
x Wire brush
x Packing kit
x Burlap/plastic bags
x Emery cloth
x Packing removal tool
x Pressure gauge with ¾”
hose bib connection
x Stem nuts
x Gaskets
x Extra chain
x 2 ½” cap, 4” cap, 4 ½” cap
x Diffuser
x Duct tape
x Gate key
x Packing and rags.

Page 248 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 13 ends

GPS Data
All the water assets encountered in this program are to be GPS mapped with sub meter or sub foot accuracy. Attribute data will be delivered in a geodatabase feature class compatible with Norco’s existing data schema. Coordinate data will be field collected with autonomous GPS readings and subsequently differentially corrected via post-processing. Wachs Water Services shall further refine positions through filtering and inspection to eliminate noise, problematic satellite geometry and multi-path degradation.

ProjectTracker™ Configuration for Integration
Wachs Water Services proposes to configure ProjectTracker™, a secure web-based map displaying our valve/hydrant leak inspection information. This interactive application is designed to be a highly accessible but secure web-portal to allow authorized users the ability to query completed and outstanding work based on discrepancy category. Our web-based application is integrated with ESRI Maps which allows you to see your information geographically (as opposed to tables with data). Our valve/hydrant data can be exported in any format to be compatible with the full suite of Microsoft Office Products (Outlook, Word, Excel, Access, etc.). We will keep the information in ProjectTracker™ live and available to the City of Norco throughout the project, and for a period of an additional 30 days after fieldwork has been completed each year.

Wachs Water Services crews and your team can use the ProjectTracker™ to quickly see asset locations and usability. The easy-to-use tool is built on established GIS standards and features include water main isolation trace capability (dependent on the City’s Metadata system), work order tracking, crew locations, photographs, and a detailed history of all work performed and any observations that were made in the field.

It’s an ideal process for tracking the progress of the work and visualizing work order priorities.

ProjectTrackerTM Online

Page 249 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 14 ends

The following are just a few examples of the many features of ProjectTracker™:
x View live updates of crew activities
x Search and zoom to GIS assets
x View results of preset queries
x Access to all inspection database records
x Update database online when repairs are made
x Ability to load base maps behind GIS (ESRI Maps)
At Wachs Water Services we feel it’s vital that, when necessary, our assessments result in repair work. Wachs Water Services has created a robust data schema allowing for a wide array of work orders to be automatically generated based on the findings of an assessment – over 400 possible combinations exist in the in-line valve schema alone. These attribute combinations will indicate the need for further work. We can automate the creation of work order records to ensure the appropriate repair work is carried out or to simply indicate that an asset was inspected, and the asset found to be satisfactory.

Documentation
Wachs Water Services will provide a valve and fire hydrant assessment report for each asset located and provide the information in an electronic format. The information will then be entered into a valve and fire hydrant online/web-based database with hard copy reproduction capabilities. The report will include, but not be limited to, the following fire hydrant information:
x The City’s Unique ID Number
x Location (Road / Coordinates)
x Summary of existing conditions
x Summary of maintenance performed
x Summary of future maintenance required
x Operability
x Isolation valve operability
x Accessibility for fire services
x Photograph
x GPS location (sub meter)
x Elevation
Wachs Water Services will document and note any corrections needed on the City's valve and fire hydrant database. These notations shall be documented as a part of the final report so the City can make corrections to their existing system.

ProjectTrackerTM Mobile

Page 250 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 15 ends

Project Deliverables
Deliverable Database
An ESRI dashboard including an overview map will also be provided for contract length. The dashboard shows a unique ID number, the number of assets inspected, those needing inspection, valve size, valve type, valve structure, number of work orders, repairs, and the percentages of the total. The overview map and charts/graphs are included to provide an easy “at a glance” overview of project status. The dashboard allows users to get information and numbers for the project immediately without the need to reach out to Wachs Water Services.

The final output can take multiple forms including:
x Data delivery: After field assessment data is quality checked, a geodatabase, shared service, or any other file type can be delivered on a routine frequency containing linked asset attributes, inspections, and work order information that may be imported into a work order management system or GIS x Secure sharing of information using ArcGIS Online: Through the creation of a secure, shared group within ArcGIS Online portals, we can share both field assessment inspections and resultant work order information. This allows you to leverage web services to update both your GIS and work order management systems in real-time as individual records are quality controlled and negate the need for an upload process into either system.

Example of a dashboard Wachs Water Services created using ESRI

Page 251 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 16 ends

Create Work Orders
Wachs Water Services will create work orders for all required repairs necessary to bring all inspected valves and hydrants within the system up to 100% operability. These work orders will be captured and managed in a GIS database to be provided by Wachs Water Services. Work orders will specifically note the discrepancy of the valve and auxiliary valve, and the repair activity required to return the valves and hydrants to full operability. Work orders will contain, at a minimum, the following information:
x Valve ID
x Valve Diameter
x Hydrant ID
x Map number
x Specific valve and hydrant discrepancy (category and details) x When in scope, specific repair activity is taken to return the valves and hydrant to full operability Valve & Hydrant Assessment Status Reporting
Wachs Water Services will provide a summary of all work completed to the City of Norco during the monthly progress meeting in a virtual call (or in person) with your designated team. This update will include a quantitative analysis of work completed, the condition of valves found, and their status post exercising. This summary will include a detailed breakdown of operability before and after each asset’s inspection and exercising.

In addition to the update, this information will be delivered in an electronic format. Accompanying the report will be a map record of inoperable and/or broken valves, a detailed summary of valves found in the wrong position, and the actions taken to correct them -- including each valve’s final position. The map record will be accompanied by a map document showing ‘out of position’ valve locations as well as a list of recommended valve repairs and replacements.

Page 252 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 17 ends

Evaluation Presentation
Wachs Water Services will evaluate and
analyze the results of the program and
develop an evaluation presentation for the
City of Norco. This evaluation
presentation will include an analysis of the
results of the program, findings, learnings,
suggestions, and recommendations for
your team.

A final deliverable will be prepared at the
completion of the project which will
include all valve & hydrant reports, and
any problems found in the system during
the valve & hydrant assessment program
that need attention. This final deliverable
shall be made available to the City within
thirty working days of the completion of
the fieldwork.

Wachs Water Services will provide a valve
database and accompanying documents,
including valve by valve information,
summary of valve conditions, work orders
created and other observations.

The report will also be a complete hydrant
database accessible by the City of Norco,
both web-based with appropriate
username and password as well as a full copy of the database on approved digital media.

Summary of Valve Data

1. Valve summary report page representative of all project valves

2. Geodatabase of all valve activities with GPS locations

3. Summary Report/Presentation of program findings
Valve Assessment & Location Data
Assessment and location data will be provided as a GIS-compliant database. Wachs Water Services will analyze Norco’s current business systems and processes (GIS and CMMS for work order management) and subsequently provide a geodatabase deliverable for the City to integrate project data into these systems. It is critical all project data reside in the planned final resting place and is accurate and usable for ongoing planning and asset management implementation by the City of Norco’s stakeholders.

Data collected for each valve will be agreed upon in advance of work startup with the City. Wachs Water Services will provide applicable valve data in a spatially accurate format compliant with the City of Norco’s existing data structure. The database shall contain the information agreed to with City of Norco and at a minimum the following attribute data:
x Asset ID

Page 253 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 18 ends

x Date of Operation
x Valve Size
x Valve Type
x Use of Valve
x Valve Structure
x Cleanout (vacuumed, pumped)
x Operating Nut Depth
x Exercised (yes, no)
x Close Direction
x Number of Turns
x Estimated Final Torque
x Torque chart for larger valves or valves that are difficult to turn can be provided if requested prior to field activities
x Valve Condition (operable, inoperable)
x Valve Discrepancies
x Structure Discrepancies
Summary of Hydrant Data

1. A detailed hydrant report for each hydrant

2. Hydrant summary report representative of all project hydrants

3. Excel/Access database of all hydrant activities and GPS locations

4. Summary Report/Presentation of program findings
Hydrant Assessment and Location Data
Assessment and location data will be provided as a GIS-compliant database. Wachs Water Services will analyze the City’s current business systems and processes (GIS and CMMS for work order management) and subsequently provide a geodatabase deliverable for the City of Norco to integrate project data into these systems. It is critical that all project data reside in the planned final resting place and is accurate and usable for ongoing planning and asset management implementation by the City of Norco’s stakeholders.

Data collected for each hydrant will be agreed upon in advance of work startup with the City. Wachs Water Services will provide applicable hydrant data in a spatially accurate format compliant with the City of Norco’s existing data structure. The database shall contain the information agreed to with the City of Norco and at a minimum the following attribute data:
x Auxiliary Valve Operability – a detailed summary of operability before and after asset inspection and exercising was performed. Accompanying this report will be a map record of inoperable and/or broken valves.
x Out of Service Hydrant Report – Summary supporting daily calls regarding out of service hydrants, accompanied by a map document showing OOS hydrant locations.

Page 254 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 19 ends

x Seized Auxiliary Valve – a detailed summary accompanied by a map depicting seized or frozen valves. Wachs Water Services will recommend threshold size, torque, and turn discrepancies constituting the frozen valve = “YES” attribute.
x Open Work Orders – a detailed summary of work orders opened in the Township’s asset management system that could not be completed during the initial pass of inspection and repair by the field crew. This report will be accompanied by a map showing location detail. o Wrong Position Valves – a detailed map document showing where valves were:
o Found closed, left closed
o Found closed, left open
o Hydrant Flow Allocation – a detailed map document allocating hydrant flow in gallons per minute to a predefined unit of space
o Validated database compliant with ESRI ArcGIS
QA/QC Plan
The first step of quality control and assurance is the management of both field process, and information tasks. Wachs Water Services excels in both areas by establishing clear lines of communication, and proper training. This allows for effective decision making at all levels ensuring we know exactly what and how to measure in order to maintain the schedule, budget, and a low error rate.

Quality assurance begins in the field where the technician collects GPS only when the post-processed accuracy (PPA) is below 12 inches in all cases where real time is not being used. It continues in the office where GIS analysts examine each record looking at the GPS quality indicators and any noncompliant records are flagged and reshot. In the office analysts will query the data and run scripts to assist with fixing any errors from the field. Wachs Water Services’ quality control tasks incorporate more than 500 rules checked against more than 50 data fields in the Wachs Water Services field activities database using Esri’s Data Reviewer. Wachs Water Services quality control can be summarized as spatial QC, and attribute QC; we also conduct random sampling to ensure field data is audited.

Wachs Water Services’ business intelligence data mining system reports field crew’s production statistics via a dashboard. Some items being monitored include daily production too high/low, workday too long/short, time between assets, the amount of work orders generated low/high vs. expected and other operational, efficiency and accuracy metrics.

Wachs Water Services Schedule
The Wachs Water Services project team selected to oversee your project is committed to working onsite with you to fulfill the obligations of this engagement in a professional and timely manner. The team will consist of qualified, experienced, and credentialed professionals from the Wachs Water Services organization.

Team members have worked together in various combinations over many years to successfully deploy and optimize the water systems for our customers. These individuals are also experienced in overseeing

Page 255 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 20 ends

installation crews, software vendors, and other subcontractors for deployments of various sizes and complexities.

This breadth of experience allows our Project Managers (PMs) to understand water projects more holistically than specialized PMs who focus on only one or two areas. Wachs Water Services PMs achieve the best results possible for our water utility customers by crafting an implementation approach based on proven methodologies, industry-recognized best practices, customer preferences, and their own expert-level knowledge.

Wachs Water Services’ experience managing projects comparable in size, scope, and location is further demonstrated by the success reported by our reference accounts.

Approach to Safety Measures
Wachs Water Services recognizes that every environment presents its own challenges regarding a safe worksite. We provide our employees with state-of-the-art online training and development in the environment, safety and health topics to enable them to meet our constantly changing business challenges and opportunities.
“Accept only Zero” is our companywide Environment, Safety, Health, and Security philosophy. It emphasizes our commitment to an incident-free workplace. We value the importance of providing our employees with:
x A safe and secure workplace
x An environment of continuous improvement
x An education to empower them to identify and address hazards Wachs Water Services can tailor safety measures to each environment’s specific challenges. To ensure safe worksites, the field crew conducts a physical security survey and assessment to determine areas that have potential safety issues.

For work areas that are determined to have potential safety issues, Wachs Water Services will adopt additional security measures, adjust working hours and provide additional employee training to ensure workers’ safety as they conduct surveys in these areas. Our workplace safety strategy includes measures to detect, assess, and manage threats. Prior to working in each area, Wachs Water Services will:
x Conduct a physical security survey and assessment of the area. x Establish procedures for addressing threats and threatening behavior. x If necessary, provide access to outside resources, such as threat assessment professionals. x Train field personnel on early recognition of warning signs of problematic situations. x Train field personnel on ways of preventing or defusing volatile situations. x Provide a standard response action plan for volatile situations, including availability of assistance and communication procedures.

Our Safety Officer has oversight of the company’s safety and health program for all divisions and has the following responsibilities:
x Developing and coordinating the overall health and safety program

Page 256 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 21 ends

x Advising the Project Manager and Supervisors on matters relating to health and safety on each project
x Recommending appropriate safeguards and procedures
x Approving changes in health and safety procedures at the site Below are the OSHA reportable accident rates for the years 2023 and 2024.

Years 2023 2024
Injury Frequency Rate .54 .41
Lost Time Rate .27 .11
Wachs Water Services will abide by all OSHA safety regulations in the fulfillment of this scope of services.

Wachs Water Services shall provide all traffic control services necessary to ensure a safe working environment for the fulfillment of the contract; however, the City of Norco will provide any traffic control above and beyond the capability of a single Wachs Water Services crew, such as additional resources or trucks. As a requirement to perform this scope of work safely, each truck crew will be staffed appropriately for the project scope.

All work vehicles will be equipped with the appropriate safety equipment for each project, which could include amber warning lights, strobe lights, directional arrow board lights, and communications equipment and will clearly identify Wachs Water Services. If necessary, Wachs Water Services can switch to nighttime operations if traffic control and safety become a factor in the completion of services.

Traffic Control
Wachs Water Services field crews will develop a pre-planned, coordinated traffic control plan the minimized the amount of traffic disruption in a safe manner.

Wachs Water Services recognizes that every environment
presents its own challenges regarding a safe worksite. Wachs Water Services tailors’ safety measures to each environment’s specific challenges. To ensure safe worksites, Wachs Water Services will conduct a physical security survey and
assessment to determine areas that have potential safety issues.

All Wachs Water Services field crew personnel are trained in specific traffic control materials, procedures, and the processes we use to ensure safe operation. Crew members will be provided with traffic control signs, rotating warning lights, corner strobe lights, cones, and traffic arrow boards on the trucks and will use these traffic control tools to set up safe workplaces as needed. If traffic control is very difficult in certain areas, then Wachs Water Services may shift to night operations (for ease of traffic control). In addition to the training, personnel also practice traffic control procedures in the field, under the guidance of a qualified Wachs Water Services individual.

Wachs Water Services will abide by all OSHA safety regulations in the fulfillment of the proposed work. We will provide all traffic control services necessary to ensure a safe working environment for the fulfillment of

Page 257 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 22 ends

the contract. At a minimum, all work vehicles will have amber warning lights, strobe lights, directional arrow board lights, communications equipment and will clearly identify our field crews. If necessary, we will switch to night-time operations if traffic control and safety become a factor in the completion of services.

Managing Challenges and Risks
We take pride in our safety record, recognizing that no personal injury or accident is acceptable. Wachs Water Services utilizes an eCompliance Safety Management System that provides comprehensive mobile access to all Wachs Water Services’ safety management policies, protocols, procedures, and guidelines.

The system allows Wachs Water Services workers to submit any field reporting such as a Job Site Assessment toolbox, and daily safety meetings checklists from their smartphone.

Through our comprehensive training programs, weekly safety shares, and daily project toolbox meetings, we have progressively improved the health and safety of our team. We certify that all company employees assigned to this project are OSHA 10 and Confined Space certified, and possess current CPR, First Aid and ATSSA Traffic Control certifications.

Please note, you can find our company’s OSHA 300 Log and a copy of our most recent modification worksheet with the uploaded Attachment Industrial Safety Record (S-23).

Professionalism
WWS will ensure that all activities are conducted in a professional manner. At a minimum, WWS will ensure all personnel are in approved uniform; all field equipment is maintained clean and neat; and all trucks are clearly identified; written procedures for field operations and information management processes are contained within the vehicle in an operations manual.

Page 258 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 23 ends

Qualifications of Company and Personnel
(Experience)
Xylem Background and History
Wachs Water Services, a division of Xylem Dewatering Solutions Inc., a Xylem brand, is the leading provider of water distribution and transmission system services advancing water network reliability. Our parent company, Xylem Inc., is a 22,000-employee company headquartered in Washington D.C. with locations all over the U.S.

Our annual revenue for 2024 was $8.6 billion.

We collaborate with utilities to deliver solutions that optimize control and reduce the liability of aging underground water infrastructure. Our specialized approach combines engineered planning, condition assessment, rehabilitation, and detailed accurate GIS information delivered to your operational business systems. We are dedicated to the effectiveness and simplicity of business processes that interact directly with your control systems.

Xylem and Wachs Water Services are uniquely capable in every facet of this project’s work with subject matter expertise that reaches far beyond hydrants and into virtually every operational corner of the water utility. We are staffed and equipped more suitably for the proposed work than any company, with highly experienced project managers and field crews ready to perform this work. Wachs Water Services will develop, plan, and execute a program that will deliver measurable, immediate, and sustainable results. The program to be executed will leverage the processes developed by Wachs Water Services which have delivered clear and measurable results for our customers.

The success of this project rests squarely on a company’s experience. Wachs Water Services’ extensive work in this field ensures that our team will carry out each task completely, on time, and on budget, and at the expected level of quality.

Wachs Water Services
For over two decades, Wachs Water Services has conducted valve and hydrant inventory and assessments and asset management programs in communities large and small, across the United States. Wachs Water Services is uniquely capable in every facet of this project’s work with subject matter expertise that reaches far beyond valves and hydrants and into virtually every operational aspect of the water utility. We are staffed Company Name
Xylem Dewatering Solutions Inc.,
dba Wachs Water Services
Water Services
Date Company Founded
1976
State of Incorporation
New Jersey
Company Website
www.xylem.com
Corporate Mailing Office
Address
84 Floodgate Road
Bridgeport, NJ 08014
Corporate Office Telephone
Number
856.467.3636
Local Office Address
11161 Harrel Street
Mira Loma, CA 91752
Local Office Telephone
Number
951.681.3636
Contact Person
Pete Olson, Jr.

Sr. Analyst, Project Management
[email protected]
M: +1.847.691.3008

Page 259 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 24 ends

and equipped more suitably for the proposed work than any company, with highly experienced project managers and field crews ready to perform this work.

Our valve & hydrant assessment and repair program will proactively increase the efficiency and control of your water distribution system -- reducing the cost and consequences of system failures (breaks and leaks) and improve the critical assets in your service area. This program will save both operating and capital investment for the City of Norco while increasing customer convenience and water quality.

Wachs Water Services will develop, plan, and execute a program to deliver measurable, immediate, and sustainable results. The program to be executed will leverage the processes developed by Wachs Water Services which have delivered clear and measurable results for our customers.

The success of this project rests squarely on the company’s experience. Wach’s extensive work in this field ensures our team will carry out each task completely, on time, and on budget, and at the expected level of quality.

Wachs Water Services has locations all over the U.S., with one local office in Mira Loma, CA, less than 7 miles away from Norco. We plan on sending our crew and equipment from this office, our key team members and crew have all completed projects within the surrounding area, including past projects with the city of Norco. This adds to the knowledge and expertise of the area and of the city itself. Xylem Dewatering Solutions Inc. is licensed to do business in California.

Please refer to the uploaded Attachment Contractor Information Form (S-18 Through S-22) for a copy of the license.

Valve Management Experience
We have inspected over 1.5 million valves, which means we know what matters most to you and your water assets. This knowledge reflects that our team has accumulated experience other responders don’t have. Our historic data and operational experience allow us to better predict the probability of failure when we review size, age/make, soil/mechanical conditions as we increase torque. This understanding means that when we are done with our work, more valves will be operational. Fewer valves will require replacement, and fewer will subsequently fail during operation.

Wachs Water Services has substantial experience performing valve condition assessment, valve exercising, and detailed documentation of operability, location, and accessibility. This experience reflects projects involving all types of valves including cone, butterfly, gate and ball valves in all orientations and gearing configurations in vaults and in roadway boxes.

Our services are unmatched in emergency field assistance, information management and data management in North America. We have the capacity to assess and maintain thousands of valves per year in water main distribution networks.

Our field team has a wealth of experience performing the tasks associated with valve management every day. The accompanying chart lists a subset of the over 400 water utilities we have delivered successful programs while also highlighting an impressive number of completed valve assessments.

Xylem is a global water
technology provider helping
our customers solve the
world’s toughest water
challenges across utility,
industrial, commercial, and
residential markets
worldwide.

Page 260 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 25 ends

City Multi-year
Program?
Valve
Assessments
Completed
Repairs
Performed?
Baltimore, MD 286,040
WSSC, MD 150,390
Houston, TX 134,040
Kansas City, MO. 112,300
Gwinnett County, GA 105,580
Atlanta, GA 83,900
San Antonio, TX 61,580
Corona, CA 75,490
Howard County, MD 53,840
Phoenix, AZ 40,400
Tempe, AZ 31,570
Charles County, MD 30,950
Kansas City, KS 20,510
Scottsdale, AZ 21,110
Gillette, WY 13,950
EPCOR, AZ 13,700
Fulton County, GA 17,290
St. Louis, MO 13,020
Middlesex, NJ 14,870
Newark, NJ 10,370
Arlington County, VA 12,620
Washington, DC 31,950
Austin Water Utility, TX 8,123
DeKalb County, GA 45,300
Cobb County, GA 19,314

Page 261 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 26 ends

Wachs Water Services Hydrant Management Experience
Wachs Water Services is dedicated to helping utilities optimize control of their aging water distribution infrastructure, which reduces the consequences of failure and improves water quality. By deploying proven methodologies in our numerous projects across North America, Wachs Water Services provides actionable information that can be used immediately to overcome the most complex underground water infrastructure challenges. For more than two decades, Wachs Water Services has been successfully performing hydrant inspections and repairs for a wide range of public and private utilities across the country, including the following utility customers: Goodyear, AZ; Scottsdale, AZ; Tempe, AZ; Mesa, AZ; Phoenix, AZ; Flagstaff, AZ; Peoria, AZ; Glendale, AZ; Corona, CA; Norco, CA; Golden State, CA; DC Water, D.C.; Atlanta, GA; Fulton County, GA; Gwinnett County, GA; Niles, IL; Lake Forest, IL; Royal Oak, IL; Kansas City, KS; Louisville, KY; Baltimore, MD; Howard County, MD; Charles County, MD; Washington Suburban Sanitary Commission, D.C.; Kansas City, MO; Charlotte, NC; Raleigh, NC; Winston Salem, NC; Plano, TX; Houston, TX; and New Braunfels, TX, Arlington County, VA; Henrico County, VA; American Water, and United Water, to name a few.

Page 262 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 27 ends

Level of ExperiencePlease see the table below for a highlight of Wachs Water Services’ experience in the last ten years. Wachs Water Services has performed work for 322 additional unique clients in the last 10 years, list available upon request.

Utility Reference Contact
No.

Contact Email Contract
Value
Valve Operation
Valve Maintenance
Hydrant Assessments
Flow Testing
Mapping Scope of Services
City/County of Baltimore
Kris Carter 410-369-
0024
[email protected] $ 38,937,686 + + + + + Valve Assessments.

Large Valve Repairs, UDF, Leak Detection, Troubleshooting Washington Suburban Sanitary Commission
Arturo Acevedo
410-715-8611
[email protected] $ 21,147,254 + + + Small Valve Assessments, Large Valve Assessment & Repairs
Gwinnett County, GA Steven
Sheets
678-376-6977
[email protected] $ 15,216,553 + + + + Valve & Hydrant Assessments & Repairs
Kansas City (KCMO) Jason Wright 816-585-
9282
[email protected] $ 11,520,588 + + + + + Valve & Hydrant Assessments & Repairs
Corona, CA David Ortiz 951-992-
8633
[email protected] $ 6,639,000 + + + + + Valve & Hydrant Assessments & Repairs, Leak Detection
Houston Alex
Rodriguez
832-395-3982
[email protected] $ 6,265,316 + + + Valve & Hydrant Assessments & Repairs, Emergency Services
Dekalb County, GA Argen
Bootsma
404-698-7102
[email protected] $ 6,114,412 + + + + + Valve & Hydrant Assessments & Repairs, UDF
Jackson, MS Jordan
Hilman
[email protected] $ 5,784,410 + + + + Valve & Hydrant Assessments & Repairs
Tucson, AZ John Gaona 520-837-
2409
[email protected] $ 5,326,720 + + + + Valve & Hydrant Assessments & Repairs, UDF, Leak Detection

Page 263 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 28 ends

Howard County, MD Art Shapiro 410-313-
2022
[email protected] $ 4,269,026 + + + + Valve & Hydrant Assessments & Repairs
Sewerage & Water Board of New Orleans (SWBNO)
Patrick Taylor
504-256-7768
[email protected] $ 4,128,353 + + + + On-Call Valve
Services, Valve Assessments
San Antonio Water System (SAWS)
Alyssa Lockett
210-233-4301
[email protected] $ 4,041,609 + + + On-Call Valve Services, Valve Assessments, ARVs
Fulton County Public Works (GA)
Nick Ammons
404-612-7530
[email protected] $ 3,600,160 + + + + Valve & Hydrant Assessments & Repairs
Anne Arundel County, MD
Abdul Azmi 443-336-
7519
[email protected] $ 3,148,955 + + + Small Valve
Assessments, Large Valve Assessment & Repairs
Tempe, AZ Barrett
Brinker
480-350-2652
[email protected] $ 2,919,992 + + + + Valve Assessments & Repairs, Leak Detection
Phoenix, AZ $ 2,894,679 + + + + Small Valve
Assessments, Large Valve Assessment & Repairs
Plano, TX Abby Owens 972-769-
4468
[email protected] $ 2,562,408 + + + + + Fire Hydrant
Assessment, Maintenance & Flow Testing
Charles County, MD Jim
Sizemore
410-509-5603
[email protected] $ 2,283,735 + + + + + Valve & Hydrant Assessments & Repairs, UDF
Austin, TX Matt Cullen 512-972-
1241
[email protected] $ 2,125,883 + + + + Small Valve Assessments, Large Valve Assessment & Repairs, Leak Detection Olathe, KS Zach Hardy 913-971-
9423
[email protected] $ 2,021,800 + + + + + Valve & Hydrant Assessments & Repairs, Fire Hydrant Flow Testing
Scottsdale, AZ Jeff Colburn 480-312-
5639
[email protected] $ 1,919,638 + + + Large Valve Assessments & Repairs

Page 264 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 29 ends

Henrico County, VA $ 1,426,303 + + + + + Unidirectional Flushing (UDF)
Dhillon Engineering (Baltimore)
Kris Carter 410-369-
0024
[email protected] $ 1,417,160 + + + + + Unidirectional Flushing (UDF), Leak Detection
Newark, NJ
Muhammad Athur
973-567-8448
[email protected] $ 1,369,106 + + + Small Valve
Assessments, Large Valve Assessment & Repairs
New Braunfels, TX Gus Ayala 830-608-
8869
[email protected] $ 1,249,000 + + + + + Fire Hydrant
Assessment, Maintenance & Flow Testing
Tooles Contracting (GLWA)
Todd King 313-799-
0289
[email protected] $ 1,100,000 + + + Large Valve
Assessments & Repairs
Cobb County, VA Ryan Coover 770-419-
6355
[email protected] $ 1,050,000 + + + Small Valve Assessments, Large Valve Assessment & Repairs
Middlesex County, NJ Stephen
Stanziano
732-638-7542
[email protected] $ 1,047,167 + + + Small Valve Assessments & Repairs
East Point, GA Melissa
Echevarria
404-669-3761
[email protected] $ 1,043,175 + + + Small Valve Assessments & Repairs
Goodyear, AZ Chad Larsen 623-882-
7594
[email protected] $ 1,042,684 + + + Small Valve Assessments, Large Valve Assessment & Repairs, ARVs
Kansas City Board of Public Utilities (BPU)
Steve Green 913-645-
1658
[email protected] $ 990,185 + + + + + Small Valve
Assessments, Large Valve Assessment & Repairs
Atlanta, GA Patrick
Woodall
404-330-6081
[email protected] $ 905,563 + + + Small Valve
Assessments, Large Valve Assessment & Repairs, Leak Detection

Page 265 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 30 ends

References
City Of Norco, CA
Project Title Valve and Hydrant Condition Assessment Program Contact Name Sam Nelson | 951.270.5607 | [email protected] Address 2780 Clark Ave., Norco CA 92860
Services Provided
The City of Norco was incorporated in 1964 and has a service area of approximately 15 square miles, located in the northwestern portion of Riverside County. The city is responsible for water maintenance and owns and operates a potable domestic drinking water system, wastewater collection system, and recycled water system within the City’s boundaries. The City’s service area has a population of approximately 26,000, approximately 7,500 municipal connections, and delivers approximately 8,000 acre-feet annually to its customers.

Faced with the challenges of an aging distribution system, the city initiated a system wide inventory, assessment and repair program of their distribution system control valves and fire hydrants. The city has and continues to work in a methodical, sequenced fashion to inventory, assess, accurately GPS and collect data on all assets. This work and resultant information is being used to improve the effectiveness and efficiency of the City’s water distribution system as well as provide a focus and direction for the City’s repair and maintenance personnel. Norco’s proactive and disciplined approach to asset management gives a sustainable path to distribution system control.

Wachs Water Services has worked with the city on multiple projects over the past 10 years completing previous valve and hydrant work described in this RFP.

Key Personnel that
Provided the
Services
Pete Olson Jr. – Regional Project Manager
Miguel Gomez – Field Operations Manager
Sam Goodness – Field Technician
Ray Tavares – Field Technician
Trevor Heburn - System Controls Information Manager
Project Dates 2014 – 2025
Contract Value $150K/Yr.

City of Corona, CA
Project Title Valve and Hydrant Assessments Program
Contact Name David Ortiz | 951.992.8633 | [email protected] Address 755 Public Safety Way, Corona CA 92882
Services Provided
The City of Corona has a population of 153,649 people. The City’s reclaimed water distribution system consists of approximately 39 miles of reclaimed water distribution pipe, varying in sizes from 2" through 24". Pressure varies from 40 PSI to 250 PSI.

Pipe material consists of Cast Iron (“CI”), Ductile Iron (“DI”), Steel (“STL”), Asbestos / Concrete (“AC”), and 44% PVC.

The length of time that Wachs Water Services Water has served this community in assessing and repairing potable water distribution system valves, valves in the City’s grey water reuse system and the City’s fire hydrants makes it a solid reference project. Through a series of multi-year contracts, Wachs Water Services has assessed the city’s 21,421 small valves, 710 large valves and 9,640 fire hydrants on

Page 266 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 31 ends

City of Corona, CA
a four-year cycle and on a two-year cycle. We have improved the City’s initial operability of valves from 60% to above 92% today. Wachs Water Services also performs hydrant repairs for the City of Corona and provides emergency response and on-call services. To date, Wachs Water Services has performed the stats below for the city:
x Large Valve Assessments - 2,293
x Small Valve Assessments - 90,891
x FH Assessment - 9,640
x Valve Repairs - 2,249
x Mapping Grade (sub foot), Post-processed GPS Data Collection completed on this project
Key Personnel that
Provided the
Services
Pete Olson Jr. – Regional Project Manager
Miguel Gomez – Field Operations Manager
Sam Goodness – Field Technician
Ray Tavares – Field Technician
Trevor Heburn - System Controls Information Manager
James Siegrist – GIS Analyst
Project Dates 2011 - present
Project Value $165K/yr.

Kansas City, MO Water Services Department (KCMO)
Project Title Valve and Hydrant Assessments, Mapping and Data Mgt. Program Contact Name Jason Wright | 816.585.9282 | [email protected] Address 4800 E 63rd Street, Kansas City, MO 64130
Services Provided
KC Water maintains and operates water collection, treatment, and distribution systems; wastewater collection and treatment systems; and stormwater management systems for 170,000 residential and business customers in Kansas City and for 32 wholesale customers in the Kansas City region.

Wachs Water Services has been providing valve and hydrant assessment, mapping and data management services to City since 2011. Through a series of five-year (renewable annually) contracts, Wachs Water Services has assessed nearly every valve and hydrant in the City’s water system multiple times in accordance with AWWA M-44 guidelines. The data Wachs Water Services has provided through these assessments has been used to update and refresh City’s GIS and Hansen CMMS systems. Wachs Water Services Water has significantly improved the distribution system pressures, flow, water quality and firefighting capacity by eliminating dead ends created by closed valves, discovered while repairing or replacing damaged, missing or rounded operating nuts on valves throughout the water system.

Over the past nine years, Wachs Water Services Water has also provided oversight and assistance for emergency and construction shuts either for City’s crews or for their on-call contractors.

Program Highlights:
x Increased valve operability from 55% to 84%

Page 267 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 32 ends

Kansas City, MO Water Services Department (KCMO)
x Total # of Valves Assessed: 95,480
x Number of Valves ≥ 20 Inches: 2,126
x Total # of Hydrants Assessed: 20,089
x Uncovered 8,964 buried assets
x 2,773 Op Nut Repairs/Replacements
x Over 2,600 Hours of Shut Assistance (planned and emergency) x Data Integration into Hansen Work Order Management System Project Dates 2011 - present
Project Value $1.3MM/yr.

Approach to Staffing
Wachs Water Services’ greatest asset is our people. Critical to the success of a program is the experience of the partner your team selects to create and execute the work.

At Wachs Water Services, it starts with hiring competent people.

We then provide an excellent training program and provide the opportunities for our team to maintain their skill levels. All in all, this is one of the largest investments Wachs Water Services makes on an annual basis, and we are committed to maintaining our team at this high performing level.

We have a formal process for training and a formal operational method that gives our people ready access to our extensive knowledge base. Our crews know exactly what choices they are authorized to make in the field -- they know when they are required to call a supervisor, and they know when to call your team.

In normal times, our experience and knowledge performing this work will be highly useful. In an emergency, when your team needs valve expertise, Wachs Water Services will be there for you. That is the essence of our approach to implementing this program. To have all the human resources, financial resources, equipment, and tools to get the job done right.

This continuous investment in our people provides many benefits to our water utility customers, and the team we have assembled for your project has decades of experience in delivering advanced system control programs which will result in a job performed right the first time. “There is no amount of training that can replace experience when it comes to developing a solid knowledge base. Wachs Water Services Water Services provides more experience, qualification, capacity, and capability, which amounts to more successful productivity and a low effective price to the City of Norco.”

Page 268 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 33 ends

Wachs Water Services’ managers and technicians are organized to reduce the timeframe and risks which revolve around significant system activities.

Wachs Water Services managers understand the tasks associated with carrying out hydrant testing services. They understand how tasks are interconnected and what type of oversight is necessary for them to be performed expeditiously and successfully. This knowledge and understanding are gained through successful experience working in a production environment nationwide.

In addition to specific project management tasks and analysis, the City of Norco will be provided with crucial communication paths between our field staff and project manager. Wachs Water Services’ project manager will be providing management of field activities, safety, and data deliverables. The Wachs Water Services project manager is responsible overall for all tasks; however, they are specifically responsible for the work breakdown structure, cost, and schedule variances for field tasks and the safety of everyone working in the field.

Project Team
Our project team has the unique qualification to be able to say that they have all worked with the City of Norco for the past valve and hydrant program and have been with the project since day one. That means there will be no surprises for our team, and they can walk on the first day of this new project, knowing exactly what is needed to complete the project. No other team or company can claim that experience for the city.

Wachs Water Services proposes the following team to work on this Water Valve and Hydrant Assessment program:

Project Manager, Point of
Contact
Pete Olson, Jr.

Valve & Hydrant
Technician
Sam Goodness

PROJECT MANAGEMENT TEAM
Valve & Hydrant
Technician
Ray Tavares
Services District Manager
Sarah Smith

DELIVERY TEAM
GIS Analyst
Trevor Heburn
Field Supervisor
Miguel Gomez

Page 269 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 34 ends

Summary of Crew
Pete Olson Jr, Production Manager – Mr. Olson is a Production Manager for Wachs Water Services with over 25 years of professional experience in the water industry. He has extensive experience in the start-up, planning and execution of valve and hydrant maintenance programs and has been the project manager on numerous programs for Wachs Water Services.

Miguel Gomez, Field Supervisor – Mr. Gomez is a Field Supervisor for Wachs Water Services with over 19 years of professional experience in water system condition assessment and rehabilitation.

Sam Goodness, Valve Technician– Mr. Goodness has extensive experience in condition assessment, leak detection and repairs. He also has experience working with different systems such as military bases, public contractors, and city utility departments in both potable and wastewater.

Ray Tavares F – Mr. Tavares is a certified Operator for Wachs Water Services with professional experience in water system condition assessment and rehabilitation.

Trevor Heburn – Mr. Heburn is a GIS Manager for Wachs Water Services and Pure Technologies at Xylem. He has over 18 years of practical experience with GIS. He has extensive experience analyzing, working with, and improving municipal GIS. He has used his knowledge of GIS on a wide range of projects including the mapping of water distribution and land change analyses. He has led a team of analysts for 5 years and currently manages a team of 25.

Please refer to the uploaded Attachment Contractor Information Form (S-18 Through S-22) for the team members complete resumes including qualifications, education, technical competence, experience, and licensing.

Key Personnel Oversight
The Wachs Water Services project team selected to oversee your project is committed to working onsite with you to fulfill the obligations of this engagement in a professional and timely manner. The team will consist of qualified, experienced, and credentialed professionals from the Wachs Water Services organization.

Our team members on this project have worked together in various combinations over many years to successfully deploy and optimize the water systems for our customers in the local area, including the city of Norco itself. These individuals are also experienced in overseeing installation crews, software vendors, and other subcontractors for deployments of various sizes and complexities.

Page 270 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 35 ends

Wachs Water Services Project Managers achieve the best results possible for our water utility customers by crafting an implementation approach based on proven methodologies, industry-recognized best practices, customer preferences, and their own expert-level knowledge.

Statement of Commitment and Availability of our Staff
At Wachs Water Services, we affirm our unwavering commitment to fulfilling the assigned task within the designated timeframe as stipulated in the contractual agreement. To ensure efficient execution, we will allocate a dedicated crew to accomplish this work.

We affirm that no existing commitments or obligations will impede Wachs Water Services from successfully concluding the scheduled work for the City of Norco.

We pledge to devote our expertise, resources, and unwavering dedication to delivering high-quality results within the specified time frame, ensuring the utmost satisfaction for all parties involved.

Ability Of Wachs Water Services to Sustain the Loss of Key Employee(s)
Wachs Water Services resources and capacity are crucial to the success of this program. Our key employees, staff and crew members are stationed nationally.

Having field crews as well as subcontractors assigned to this project allows our project manager to flex staff and maintain schedules when weather causes delays. Of potentially greater importance, this capability to flex staff is advantageous during emergencies because it permits rapid response with the appropriate number of staff without having adverse impact on the project schedule. Our project team is structured specifically to leverage geography. That means that a field crew moved from Norco or one of our other local projects will consist of highly experienced water distribution operators employed by Wachs Water Services.

This makes our capacity more fluid. Another Contractor would certainly have problems maintaining the schedule with a small amount of turnover whereas our team would quickly adjust to the schedule by shifting resources. This means that we have excess capacity locally that is sent to other locations providing substantial flexibility.

Page 271 of 388 ends

Water Valve and Hydrant Assessment Services
FY 2025-26 through 2027-28

Page 36 ends

Reasonableness of Cost and Price
Please see the attached required forms for the full Firm Fixed Price costing sheet with signature.

Item Description U/M Qt
y.

Cost/
Unit
Sub-Total
1 Perform Water Valve
Assessment, Testing
and Survey including
GPS
each 1 $63.20 $85,320.00
2 Raise Valve Boxes to
Grade in Dirt, Grass,
Sand or Gravel Areas
(<=12”)
each 1 $102.00 $204.00
3 Raise Valve Boxes to
Grade in Asphalt Paved
Areas (<=12”)
each 1 $200.00 $200.00
4 Mobilization each 1 $500.00 $500.00
5 Perform Fire Hydrant
Assessment, Testing
and Survey including
GPS
each 1 $66.05 $44,914.00
6 Perform Large Water
Valve Assessment,
Testing and Survey
including GPS: Valves
(>=16")
each 1 $244.00 $4,148.00
7 Perform Reclaimed
System Water Valve
Assessment, Testing
and Survey including
GPS
each 1 $63.20 $695.20
8 Perform GPS and
Documentation of nonoperated
appurtenances
each 1 $13.60 $136.00
9 Hourly Crew Rate each 1 $249.00 $249.00
Total $136,366.20

Page 272 of 388 ends

PRICE FORM
REQUEST FOR PROPOSALS: Water Valve and Hydrant Assessment Services CONTRACTOR’S NAME/ADDRESS:

NAME/TELEPHONE NO. OF

AUTHORIZED REPRESENTATIVE

ANNUAL PURCHASE ORDER
The Initial Purchase Order Period shall be effective on or about July 1, 2025 through June 30, 2028 plus one two-year option renewal period. Prices shall remain effective and in force for the entire Initial Purchase Order Period.

The City retains the right to exercise the optional two-year renewals at its sole discretion. The twoyear option renewal period, if exercised, shall be effective July 1, 2028 through June 30, 2029. Actual option two-year pricing shall be negotiated with the successful Contractor prior to exercising of any given optional two- years. Option years shall become effective only upon issuance by the City of a duly authorized Purchase Order.
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV 
6WDWH5RXWH6XLWH'
&ROXPELD0'
3HWH2OVRQ-U3URGXFWLRQ0DQDJHU

Page 273 of 388 ends

Please provide detailed Firm Fixed Price cost information in the spaces provided below, and any other incidental or additional costs required to complete the Technical Specification requirements.

Item Description U/M* Qty. Cost / Unit Sub-Total
1 Perform Water Valve Assessment,
Testing and Survey including GPS each 1 $ $
2 Raise Valve Boxes to Grade in Dirt,
Grass, Sand or Gravel Areas (<=12”) each 1 $ $
3 Raise Valve Boxes to Grade in
Asphalt Paved Areas (<=12”) each 1 $ $
4 Mobilization each 1 $ $
5 Perform Fire Hydrant Assessment,
Testing and Survey including GPS each 1 $ $
6 Perform Large Water Valve
Assessment, Testing and Survey
including GPS: Valves (>=16") each 1 $ $
7 Perform Reclaimed System Water
Valve Assessment, Testing and
Survey including GPS each 1 $ $
8 Perform GPS and Documentation of
non-operated appurtenances each 1 $ $
9 Hourly Crew Rate each 1 $ $
Total Price, written in numbers: $
Total Price, written in words:
*U/M = Unit of Measure
Amount Written in Words. Where there is a discrepancy between words and figures, WORDS WILL GOVERN. Where there is a discrepancy between item unit price and extended total, UNIT PRICE WILL GOVERN.

Please check your calculations before submitting your proposal; the City will not be responsible for Contractor miscalculations.

In the event that contractor intends to proposal zero dollar value for any item shown in the Price Form, contractor shall enter “zero” or “0” in the space provided for price or cost. With the exception of “Reason(s) for No Proposal”, all spaces in the Price Form shall be filled in by contractors. City reserves the right to reject as non-responsive any or all proposals containing blank spaces.

Contractor shall complete the following required information:
 
 
 
 
 

 
 

 

 


2QH+XQGUHG7KLUW\6L[7KRXVDQG7KUHH+XQGUHG6L[W\
6L['ROODUVDQG7ZHQW\&HQWV

Page 274 of 388 ends

Contractor's Acknowledgement of His Understanding of the Terms and Conditions. Signature below verifies that Contractor has read, understands, and agrees to the conditions contained herein and on all of the attachments and agenda.

Are there any other additional or incidental costs which will be required by your firm in order to meet the requirements of the Technical Specifications? Yes / No . (circle one). If you answered “Yes”, please provide detail of said additional costs:

Please indicate any exceptions to or deviations from the RFP/Q Requirements here.

Have you included in your proposal all informational items and forms as requested? Yes / No (circle one). If you answered “No”, please explain:

Have you been or are you on any federal list of debarred or suspended Contractors? Yes / No (circle one)
This offer shall remain firm for 60 calendar days from RFP/Q close date. Terms and conditions as set forth in this RFP/Q apply to this solicitation.

Cash discount allowable % days; unless otherwise stated, payment terms are: Net thirty (30) days.

In signing this proposal, Contractor warrants that all certifications and documents requested herein are attached and properly completed and signed.
1$
1$

Page 275 of 388 ends

From time to time, the City may issue one or more addenda to this RFP/Q. Below, please indicate all Addenda to this RFP/Q received by your firm, and the date said Addenda was/were received. It is the contractor’s responsibility to ensure that all addendums are received. Failure to acknowledge receipt of addenda may cause the City to reject the proposal as non-responsive.

Verification of Addenda Received
Addenda No:

Addenda No:

Addenda No:

Received on:

Received on:

Received on:

AUTHORIZED SIGNATURE:

PRINT SIGNER’S NAME AND TITLE:

DATE SIGNED:

COMPANY NAME & ADDRESS:

PHONE: FAX:

EMAIL:

IF NOT SUBMITTING A PROPOSAL, PLEASE STATE REASON(S) BELOW:
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV  
SHWHROVRQMU#[\OHPFRP

 6WDWH5RXWH6XLWH'
&ROXPELD0'
6DUDK6PLWK
6HUYLFHV'LVWULFW0DQDJHU


Page 276 of 388 ends

PARTY SUBMITTING PROPOSAL:

NON-COLLUSION DECLARATION
(TO BE EXECUTED BY CONTRACTOR AND SUBMITTED WITH PROPOSAL) The undersigned declares:

I am the [title] of
[contractor], the party making the foregoing proposal.
[city], [state].

Signature
Typed or Printed Name
Title
Party Submitting Proposal
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV ;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV ;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV 6HUYLFHV'LVWULFW0DQDJHU
6HUYLFHV'LVWULFW0DQDJHU
6DUDK6PLWK
The proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The proposal is genuine and not collusive or a sham. The contractor has not directly or indirectly induced or solicited any other contractor to put in a false or sham proposal. The contractor has not directly or indirectly colluded, conspired, plotted, or agreed with any contractor or anyone else to put in a sham proposal, or to refrain from submitting a proposal. The contractor has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the contractor or any other contractor ,or to fix any overhead, profit, or cost element of the proposal price, or of that of any other contractor. All statements contained in the proposal are true. The contractor has not, directly or indirectly, submitted his or her proposal price, or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a contractor that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the contractor.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on -XQH [date], at 3HZDXNHH :LVFRQVLQ

Page 277 of 388 ends

S-16
State of California } CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT County of Riverside } ss.

On (date), before me,
(here insert name and title of the officer), personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
[Seal]
Signature
Signature
-XO\ 6DUDK6PLWK6HUYLFHV'LVWULFW0DQDJHU
6DUDK6PLWK
7UDF\0LOOHU

Page 278 of 388 ends

Xylem is excited to partner with The City of Norco on this Water Valve and Hydrant Assessment Services project. We are pleased to provide you with our proposal, and we thank you for this opportunity.

Xylem Dewatering Solutions Inc.
dba Wachs Water Services
8920 State Route 108
Suite D
Columbia, MD 21045
Tel +1 443.766.7873
Fax +1 443.766.7877
www.xylem.com

Page 279 of 388 ends

ACKNOWLEDGMENT OF THE TERMS AND CONDITIONS OF

THE CITY OF NORCO WATER VALVE AND HYDRANT

ASSESSMENT SERVICES AGREEMENT
This is to acknowledge that we have read the City of Norco Water Valve and Hydrant Assessment Services Agreement and will sign the Agreement, as presented, without exception. (Firm name)
(Print name and title of person signing for firm)
(Signature/date)
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV 6DUDK6PLWK6HUYLFHV'LVWULFW0DQDJHU


Page 280 of 388 ends

CONTRACTOR INFORMATION FORM
A. Information about Contractor
[***Indicate not applicable (“N/A”) where appropriate.***] NOTE: Where Contractor is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.
1 Name of Contractor:
2 Type, if Entity:
3 Contractor Address:

Email Address Telephone Number

4. License Number DIR Registration Number
5 How many years has Contractor’s organization been in business performing water valve assessment services?
6 How many years has Contractor’s organization been in business under its present name?

6.1 Under what other or former names has Contractor’s organization operated?:
7 If Contractor’s organization is a corporation, answer the following:

7.1 Date of Incorporation:

7.2 State of Incorporation:

7.3 President’s Name:

7.4 Vice-President’s Name(s):

7.5 Secretary’s Name:

7.6 Treasurer’s Name:
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV &RUSRUDWLRQ

6WDWH5RXWH6XLWH'
&ROXPELD0'
SHWHROVRQMU#[\OHPFRP 
&RPSDQ\




3XUH7HFKQRORJLHV,QFGED:DFKV:DWHU6HUYLFHV*RGZLQ3XPSVRI$PHULFD 
IRU'HZDWHULQJIRU:DFKV:DWHU6HUYLFHV
1-
9LQFHQ]R*9LROL
5REHUW:%DUWOHWW
0DWWKHZ/DWLQR
.HQQHWK$OEDXJK
%UHQW-RKQVRQ


&HOO

Page 281 of 388 ends

8 If an individual or a partnership, answer the following:

8.1 Date of Organization:

8.2 Name and address of all partners (state whether general or limited partnership):
9 If other than a corporation or partnership, describe organization and name principals:

10. List other states in which Contractor’s organization is legally qualified to do business.

11. What type of work does the Contractor normally perform with its own forces?

12. Has Contractor ever failed to complete any work awarded to it? If so, note when, where, and why:

13. Within the last ten years, has any officer or partner of Contractor’s organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:
1R
1R
1$
1$
/HJDOO\TXDOLILHGLQDOOVWDWHV
/HDN'HWHFWLRQ9DOYH,QVSHFWLRQDQG$VVHVVPHQW+\GUDQW)ORZ7HVWLQJDQG$VVHVVPHQW

Page 282 of 388 ends

14. List Trade References:

15. List Bank References (Bank and Branch Address):
&LWL%DQN
2QH3HQQV:D\
236)ORRU
1HZ&DVWOH'HODZDUH

'L[RQ9DOYH
0HJDG\QH$PHULFD//&
)ROH\,QF
/RXLV3&DQXVR,QF

Page 283 of 388 ends

B. Personnel (copy this page if additional space is required) The Contractor shall identify the key personnel to be assigned to this project in a management, construction supervision or engineering capacity.

1. List each person’s job title, name and percent of time to be allocated to this project:

2. Summarize each person’s specialized education:

3. List each person’s years of experience relevant to the project:

4. Summarize such experience:

Contractor agrees that personnel named in this Proposal will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.
3HWH2OVRQ-U3URMHFW0DQDJHU
6DP*RRGQHVV9DOYH7HFKQLFLDQ 5D\7DYDUHV9DOYH7HFKQLFLDQ 0LJXHO*RPH])LHOG6XSHUYLVRU&UHZ&KLHI
0U2OVRQLVD3URGXFWLRQ0DQDJHUIRU:DFKV:DWHU6HUYLFHVZLWK\HDUVRISURIHVVLRQDOH[SHULHQFHLQWKHZDWHULQGXVWU\+HKDV H[WHQVLYHH[SHULHQFHLQWKHVWDUWXSSODQQLQJDQGH[HFXWLRQRIYDOYHDQGK\GUDQWPDLQWHQDQFHSURJUDPVDQGKDVEHHQWKHSURMHFW PDQDJHURQQXPHURXVSURJUDPVIRU:DFKV:DWHU6HUYLFHV
::6SURYLGHVDWUDLQLQJSURJUDPWKDWKHOSVRXUWHDPPHPEHUVPDLQWDLQWKHLUVNLOOOHYHOVDVZHOO PDLQWDLQLQJWKHQHFHVVDU\OLFHQVHVDQGFHUWLILFDWLRQV3OHDVHUHIHUWRWKHDWWDFKHGUHVXPHVIRUPRUH LQIRUPDWLRQ
2XUWHDPPHPEHUVDUHDOOZHOOH[SHULHQFHGZLWKDOOOLVWHGKDYLQJFORVHWRWZHQW\\HDUVRIH[SHULHQFH RUPRUH3OHDVHUHIHUWRDWWDFKHGUHVXPHVIRUPRUHLQIRUPDWLRQ 0U*RPH]LVD)LHOG6XSHUYLVRUIRU:DFKV:DWHU6HUYLFHVZLWKRYHU \HDUVRISURIHVVLRQDOH[SHULHQFHLQZDWHUV\VWHPFRQGLWLRQ DVVHVVPHQWDQGUHKDELOLWDWLRQ
0U*RRGQHVVKDVH[WHQVLYHH[SHULHQFHLQFRQGLWLRQDVVHVVPHQWOHDNGHWHFWLRQDQGUHSDLUV+HLVDOVRKDVH[SHULHQFHZRUNLQJZLWK GLIIHUHQWV\VWHPVVXFKDVPLOLWDU\EDVHVSXEOLFFRQWUDFWRUVDQGFLW\XWLOLW\GHSDUWPHQWVLQERWKSRWDEOHDQGZDVWHZDWHU 0U7DYDUHVLVDFHUWLILHG2SHUDWRUIRU:DFKV:DWHU6HUYLFHVZLWKSURIHVVLRQDOH[SHULHQFHLQZDWHUV\VWHPFRQGLWLRQDVVHVVPHQWDQG UHKDELOLWDWLRQ
3OHDVHVHHEHORZIRUVXPPDULHV3OHDVHUHIHUWRDWWDFKHGUHVXPHVIRUPRUHLQIRUPDWLRQ

Page 284 of 388 ends

Additional Contractor’s Statements:

If the Contractor feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:

C. Verification and Execution
These Forms shall be executed only by a duly authorized official of the Contractor:

I declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:

Name of Contractor
Signature
Name
Title
Dated
6HUYLFHV'LVWULFW0DQDJHU
6DUDK6PLWK
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV :DFKV:DWHU6HUYLFHVKDVEHHQSURYLGLQJWKH&LW\RI1RUFRDVVHVVPHQWVDQGUHSDLUVRQWKHLUYDOYHV DQGK\GUDQWVVLQFH:HKRSHWRUHFHLYHDSRVLWLYHRXWFRPHRIRXUVXEPLWWDODQGZHORRN IRUZDUGWRRXUFRQWLQXHGVXFFHVVIXOUHODWLRQVKLSZLWKWKH&LW\ 

Page 285 of 388 ends
Page 286 of 388 ends

PETER OLSON, JR.

PROJECT MANAGER

CERTIFICATIONS/REGISTRATIONS
x Wachs Certified Project Manager
x Field Operations Classroom Trained and Certified Trainer x Wachs Certified Operator and Crew Chief
x Truck Safety, Equipment and Inspection Training
x Trimble Operation and Data Management Training
x Confined Space Entry Certification
x First Aid/CPR Certification
x Flagger Certification
x PMP Trained
x Hydrant Flushing / Flow Trained
x 10 Hour OSHA Training Certification
x 30 Hour OSHA Training Certification

PROFESSIONAL SUMMARY
Mr. Olson is a Production Manager for Wachs Water Services with over 20 years of professional experience in the water industry. He has extensive experience in the start-up, planning and execution of valve and hydrant maintenance programs and has been the project manager on numerous programs for Wachs Water Services.

PROJECT EXPERIENCE
Mr. Olson has extensive experience in the start-up, planning and execution of valve and fire hydrant maintenance programs and has been the Project Manager for numerous valve and fire hydrant repair and highly technical large valve repair programs. Peter is an expert in the use and maintenance of valve and fire hydrant operating equipment and valve operating procedures and processes.

Valve and Hydrant Assessment Experience
Mr. Olson has inspected, audited and exercised thousands of valves from 1-inch ball valves to 72-inch gate, butterfly and cone valves. He is an expert at the use and application of valve operators, torque limits on specific valves and operating characteristics of different types of valves. Mr. Olson has specific expertise in the operation of large and high-torque valves.

Equipment and Mobilization Experience
Mr. Olson is an expert at fitting out rolling stock with the right equipment to do the specific job. He has experience in building multiple valve and fire hydrant exercising trucks in order to service utilities.

Repair and Mechanical Experience
Mr. Olson has extensive experience in valve repairs that includes small gate valves, large geared gate valves, cone valves, valve structure repairs (roadway boxes and vaults) and fittings.

Page 287 of 388 ends

Mr. Olson has been involved in many valve and hydrant assessment and repair programs. His experience includes the following:
x Flint, MI - Valve and Hydrant Assessment
x Halifax, NS - Large Valve Repair
x Norco, CA - Hydrant Flow Testing
x Lake Zurich, IL - Valve Assessment
x Montrose, CO - Valve Assessment
x Corpus Christi, TX - Pipeline Condition Assessment Program x Canton, OH - Valve Assessment Program
x Corona, CA - Valve Assessment Program
x Aqua, IL - Valve Assessment Program
x St. Joseph, MI - UDF Program
x Cornwall, ON - Valve Assessment Pilot Program
x Austin, TX - Hydrant Assessment and Repair Program
x Oxnard, CA - Valve and Hydrant Assessment Program
x Henrico County, VA - Valve and Hydrant Assessment and Repair Program x Charlotte Mecklenburg Utilities, NC - Valve Assessment Program x Raleigh, NC - Valve Assessment and Rehabilitation Program x Wilson, NC - Valve Assessment Program
x Eastern Municipal Water, CA - Valve Assessment Program x Nipomo, CA - Valve Assessment Program

Page 288 of 388 ends

MIGUEL GOMEZ

FIELD SUPERVISOR/CREW CHIEF

CERTIFICATIONS/REGISTRATIONS
x Water Technology Certificate, Mt. San Jacinto College, CA x OSHA 10-Hour
x First Aid/CPR/AED
x California Water Distribution Operator Level 2
x Certified Crew Chief

PROFESSIONAL SUMMARY
Mr. Gomez is a Field Supervisor for Wachs Water Services with over 19 years of professional experience in water system condition assessment and rehabilitation.

EXPERIENCE
Mr. Gomez is a certified as Crew Chief and has extensive experience in asset management and condition assessment, leak detection, and repairs. He is also experienced working in different systems such as military bases, public contractors, and city utility departments in both potable water and wastewater. His broad understanding of water distribution systems is the result of having held a variety of positions in the industry. Mr. Gomez is skilled in managing projects in a timely manner, meeting deadlines, and preparing for successful day-to-day operations while never losing focus on the importance of crew safety. In addition to his expertise in the field, he is very successful in managing, analyzing, and interpreting field-collected data. As well, Mr. Gomez has led crews and provided field supervision for many asset management and condition assessment projects and programs. Below are a few select projects and program references. x Valve and Hydrant Inspection Multi-Year Program, Corona, CA x Fire Hydrant and Isolation Valve Assessment Program, Norco, CA x Valve Assessment Program, Phoenix, AZ
x Large Valve Assessment Project, San Diego, CA
x Pipeline Condition Assessment Project, Water One, Johnson County, KS

Page 289 of 388 ends

SAM GOODNESS

VALVE TECHNICIAN

EDUCATION
x B.A., Sociology, University of Hawaii (2001)

CERTIFICATIONS/REGISTRATIONS
x CA Water Distribution Operator, Grade D2, Operator License #41849 x CA Water Treatment Operator, Grade T2 – Operator License # 41146 x First Aid/CPR/AED
x Confined Space Entry and Non-Entry Rescue
x Flagger Certification
x OSHA 10-Hour
x Truck Safety, Equipment, and Inspection Training
x Certified Water Operator and Crew Chief
x AWWA Backflow Prevention Assembly Tester Certification #18239

PROFESSIONAL SUMMARY
Mr. Goodness is a Crew Chief for Wachs Water Services with over 22 years of professional experience in water system condition assessment and rehabilitation experience. Overview of person’s professional experience, including years of experience. Mr. Goodness has extensive experience in condition assessment, leak detection and repairs. He is also has experience working with different systems such as military bases, public contractors, and city utility departments in both potable and waste water.

Mr. Goodness has a broad understanding of water distribution systems. He is skilled in managing projects in a timely manner, meeting deadlines and preparing for successful day-to-day operations while never losing focus of the importance of crew safety. Among other important skills, Mr. Goodness is very successful managing, analyzing, and interpreting field collected data.

PROJECT EXPERIENCE
Mr. Goodness has been involved in leading crews for many asset management and condition assessment projects and programs. Below are a few select projects and program references. x Fire Hydrant Inspection Program, Beverly Hills, CA
x Valve Assessment Program, Camrosa Water District, CA
x Valve Asessment Program, Project Title, City, State (or Country, if applicable) x Valve Assessment Program, Flint, MI
x Sahara® Inline Tethered Inline Inspection, Fullerton, CA

Page 290 of 388 ends

x Valve Assessment and Repair Program, Fulton County, GA x Valve Assessment and Repair Program, Gwinnett County, Ga x Valve Inspection Program, Middlesex, NJ
x Valve Assessment Project, EPCOR, AZ
x Sahara Inline Tethered Inspection Project, San Diego, CA x Reclaimed Water System Valve Assessemnt Project, San Jose, CA

Page 291 of 388 ends
Page 292 of 388 ends

RAY TAVARES

VALVE TECHNICIAN

CERTIFICATIONS/REGISTRATIONS
x Wachs Water Services and Pure Technologies Certified Water Operator x OSHA 10-Hour Construction Program Certified
x Truck Safety, Equipment, and Inspection Training
x Flagger Certification
x Certified in Safety, CPR and First Aid
x Confined Space Entry and Non-Entry Rescue
x SWRCB - D2 Certification, 11/19

PROFESSIONAL SUMMARY
Mr. Tavares is a certified Operator for Wachs Water Services with professional experience in water system condition assessment and rehabilitation.

PROJECT EXPERIENCE
Mr. Tavares has been involved in many in valve and hydrant assessments. His experience includes the following:
x Corona, CA - Valve and Hydrant Assessments
x Norco, CA - Valve and Hydrant Assessments
x Gwinnett County, GA - Valve Assessments
x Houston, TX - Valve Assessments
x San Jose, CA - Valve Assessments
x Fulton County, GA - Valve and Hydrant Assessments
x Steubenville, OH - Valve Assessments
x Phoenix, AZ - Valve and Hydrant Assessments
x Camarillo, CA - Valve Assessments
x Gillette, WY - Valve Assessments
x Pacheco Clara/Gilroy, CA - AFO Conduit
x Kings Bay, GA - Sahara
x Fullerton, CA - Sahara (Michael Baker International)
x San Diego, CA - Sahara (City of San Diego)

Page 293 of 388 ends
Page 294 of 388 ends

Trevor Heburn

GIS MANAGER

EDUCATION
x B.A. Geography, Geography, Clark University, Worcester, MA, 2009 x M.A. Geography, GIS for Development and Environment, Clark University, Worcester, MA, 2011

CERTIFICATIONS/REGISTRATIONS
x 103lV^I]NNlpVœNL3lAV_V_TSal-1"AiiV_TSal1wVpU3NllAmy_JA_L -ApUœ_LNl%SœJN
x 1-1A_L"AiiV_T1aSpwAlN’lJ1€x‘lJ1-la‘-awNl ‘lJvVNwƒx‘
lJ11NlvNl‘lJ1‘qpa"Ai‘lJ_Sa‘lJ-AL‘01^ATV_N‘01‘ /qA_pq^1‘1/!NvN]aiNl‘!%0‘aaT]NAlpU‘-amp1‘-Nai]N1‘ Ÿx Up^]‘AvA1JlVip‘-ypUa_‘9VmqA]
AmVJ‘-ApUœ_LNl%SœJN‘A_mN_‘3lV^I]NNa;
units
x
qmV_Nmm1aSpwAlN’"VJlamaSp%SœJN1qVpN

PROFESSIONAL SUMMARY
"lNIql_VmA1"A_ATNlSalpUN:AJUm:ApNl1NlvVJNmA_L-qlNIlA_LmAp;y]N^NUAm ‡yNAlmaSilAJpVJA]NxiNlVN_JNwVpU1NUAmNxpN_mVvNNxiNlVN_JNA_A]y|V_T‘wal\V_T wVpU‘A_LV^ilavV_T^q_VJViA]1NUAmqmNLUVm\_aw]NLTNaS1a_AwVLe range of ila[NJpmV_J]qLV_TpUN^AiiV_TaSwApNlLVmplVIqpVa_A_L]A_LJUA_TNA_A]ymNmN has led a team of analysts for 5 years and currently manages a team of 25.

PROJECT EXPERIENCE
GIS Experience
"lNIql_^A_ATNmA]]A_A]ympmA_LV_Sal^ApVa_Sal-qlN3NJU_a]aTVNmA_L:AJUm:ApNl 1NlvVJNmila[NJpmNUAmA]a_TUVmpalyaSqpV]V|V_T1pa^AxV^V|NNSSVJVN_JyV_pUNSVN]L‘ lNJalLV_TA_LlNmNAlJUV_TLVmJlNiA_JVNm‘A_LJa_JVmN]ylNialpV_TSV_LV_TmNUAmATlNAp deal of training in geographic information systems and leverages his training to provide high kqA]VpyLApAA_LA_A]ymNmA_LN_mqlNmA]]A_A]ympmqiUa]LAUVTUmpA_LAlLaSwal\NmpAym V_va]vNLwVpUqiLApNmA_L_NwilaLqJpmpaN_mqlNpUNUVTUNmpkqA]VpyV_Sal^ApVa_JA_IN provided.

Systems Integration Experience and Process Development
"lNIql_UAmJa_mVLNlAI]N\_aw]NLTNA_LNxiNlpVmNV_ LNA]V_TwVpUA_LqpV]V|V_T]AlTN LApAIAmNmNqmNm"VJlamaSp%SSVJN1qVpNA_LlJ1pamplNA^]V_NNxVmpV_TilaJNmmNmA_Lpa JlNApN_Nwa_NmNVmA_NxiNlpApLNvN]aiV_TLApA^A_ATN^N_pilaJNmmNmA_LqmV_TpUNVl implementation to increase efficiency. MlNIql_SaJqmNma_IapUJa_mVmpN_pA_LLNpAV]- alVN_pNLLApA^A_ATN^N_p‘A]]awV_TSalLNvN]ai^N_paS_Nw^NpUaLmwUV]N^AV_pAV_V_TpUN kqA]VpyaSNxVmpV_TilaJNLqlNm

Page 295 of 388 ends

GPS Experience
"lNIql_UAmATlNApLNA]aSNxiNlVN_JNwVpU-1‘laqpV_N]yqiLApV_T‘pNmpV_T‘A_L plaqI]NmUaapV_TLNvVJNmNVmA_NxiNlpApN_mqlV_T-1VmilaJNmmNLAJJalLV_TpapUN miNJVSVJ_NNLmaSNAJUila[NJpNVmNxiNlVN_JNLqmV_T-1AmApaa]paN_UA_JNpUN GIS mympN^mUNwal\mwVpUA_LpaLNvN]aiALvA_JNLkqA]VpyJa_pla]ilaJNLqlNm Water Distribution Systems Experience
"lNIql_UAmATlNApLNA]aS\_aw]NLTNlNTAlLV_TwApNlmympN^m‘UAvV_TUALNxiNlVN_JN wal\V_TLVlNJp]ySal^q_VJViA]VpVNmAmwN]]AmSal:AJUm:ApNl1NlvVJNmA_L-qlN3NJU_a]aTVNm Ap;y]N^N^A_ATNmpUNLApASalA]]:AJUmA_L-qlNila[NJpmA_Lwal\mJ]amN]ywVpUNAJU Jqmpa^NlpaN_mqlNpUNVl_NNLmAlN^NpNUAmNxiNlVN_JNV_pUNSVN]L‘Ja_LqJpmmVpNvVmVpm wUV]NJlNwmAlNwal\V_T‘A_LUAmATlNApLNA]aS\_aw]NLTNlNTAlLV_TpUNV__Nlwal\V_TmaS UyLlA_pm‘vA]vNm‘A_LwApNlmympN^mN^AV_pAV_mTaaLJa^^q_VJApVa_wVpUSVN]LJlNwm‘ma issues are addressed as soon as possible.
"lNIql_UAmINN_involved V_^A_yila[NJpmVmNxiNlVN_JNV_J]qLNmpUNSa]]awV_T’ x Information Management for all Wachs Water Services and Pure Technologies projects 2020-Current for Wachs, 2021 – Current for Pure
x Management of Analysts for all Wachs Water Services and Pure Technologies projects 2020-Current, 2021 – Current for Pure
x WSSC – Large/ARV Assessment Program 2013 - Current
x Tucson UDF 2021 - Current
x SWBNO 2021 – Current
x KCMO 2020 – Current
x DeKalb County 2021 - Current
x Gwinnett County 2020 - Current
x Howard County 2012 – 2021
x Baltimore 2020 – Current
x Charles County 2016 – Current
x Corona, CA 2018 – Current
x Norco, CA 2018 - Current
x Quality Control Supervision 2017 - Current

Page 296 of 388 ends

CONTRACTOR EXPERIENCE
Contractor is required to have successfully performed water valve and hydrant assessment, rehabilitation and information management work for a minimum of five (5) years and submit references for three (3) projects. The three projects must meet the following criteria:
• Completion of at least 25,000 valves (not including hydrant isolation valves). • Completion of at least 50,000 mainline valves (not including hydrant isolation valves) and 1,000 valves that are 20inch and larger.
• Completion of at least 25,000 sub-meter, post processed GPS positions on water valves or hydrants.

1. Contact Name
Address
Phone Number
Contact Person
Dates of Contract to
Value of Contract

2. City Name
Address
Phone Number
Contact Person
Dates of Contract to
Value of Contract

3. City Name
Address
Phone Number
Contact Person
Dates of Contract to
Value of Contract
I hereby certify that I have performed the work listed above.

Signature of Contractor
&LW\RI1RUFR
&ODUN$YHQXH
1RUFR&$

SHU\HDU
 
6DP1HOVRQ


&LW\RI&RURQD
3XEOLF6DIHW\:D\
&RURQD&$

SHU\HDU
 3UHVHQW
*HQH6LOYDV


.DQVDV&LW\02:DWHU6HUYLFHV'HSDUWPHQW
.&02

(UG6WUHHW
.DQVDV&LW\0R
-DVRQ:ULJKW


 3UHVHQW
SHU\HDU

Page 297 of 388 ends

CONTRACTOR 'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS The Contractor is required to state any and all instances of being disqualified, removed, or otherwise prevented from submitting a proposal, or completing any, contract for water valve assessment services.

1. Have you ever been disqualified from any contract:

Yes No

2. If yes, explain the circumstances:

Signature of Contractor

Page 298 of 388 ends

INDUSTRIAL SAFETY RECORD
(To be Completed and Submitted with Contractor’s Proposal) Total
Firm Name (Print)
Signature
Name and Title (Print)
Date
;\OHP'HZDWHULQJ6ROXWLRQV,QFGED:DFKV:DWHU6HUYLFHV 6DUDK6PLWK6HUYLFHV'LVWULFW0DQDJHU
Number of OSHA Violations within the last 5 years (must state zero if none):

Serious Willful Repeat Other Unclass



Page 299 of 388 ends
Page 300 of 388 ends
Page 301 of 388 ends

Elizabeth Caracino, ARM
Vice President
Marsh USA Inc.
1166 Avenue of the Americas
New York, NY 10036-2774
+1 212 345 2008
[email protected]
www.marsh.com
August 15, 2024
Subject: Xylem Inc.

Interstate Experience Modification Factors
To Whom It May Concern:

Please be advised that Xylem Inc.’s Interstate Experience Modification Factors (EMR) for the past six years are as follows:

Policy Period EMR
10/31/24 – 10/31/25 .80
10/31/23 – 10/31/24 .74
10/31/22 – 10/31/23 .82
10/31/21 – 10/31/22 .90
10/31/20 – 10/31/21 .83
The Experience Modification of .74 goes into effect on October 31, 2024.

Sincerely,
Elizabeth Caracino
Elizabeth Caracino

Page 302 of 388 ends

1 CITY OF NORCO

WATER VALVE AND HYDRANT ASSESSMENT SERVICES

AGREEMENT

1. Parties and Date.

This Agreement is made and entered into this 6
th day of August, 2025 by and between the City
of Norco, a municipal corporation of the State of California, located at 2870 Clark Avenue, Norco, California 92860, County of Riverside, State of California, (hereinafter referred to as “City”) and Xylem Dewatering Solutions, Inc. dba Wachs Water Services, a corporation with its principal place of business at 8920 State Route 108, Suite D, Columbia, MD 21045 (hereinafter referred to as “Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.

2. Recitals.

2.1 Contractor.

Contractor desires to perform and assume responsibility for the provision of certain maintenance services required by the City on the terms and conditions set forth in this Agreement. Contractor represents that it is experienced in providing valve and hydrant maintenance services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that is familiar with the plans of the City.

2.2 Project.

Contractor desires to engage Contractor to render such services for the Water System Distribution Valve and Hydrant Assessment, Testing and Information Management Program (“Project”) as set forth in this Agreement.

3. Terms.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the tasks described and set forth in Exhibit A (Wachs Water Services proposal), attached hereto and incorporated herein as though set forth in full (“Services”). All Services shall be subject to, and performed in accordance with this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. This AGREEMENT shall commence on August 6, 2025, and shall remain and continue in effect through June 30, 2028 unless terminated pursuant to the provisions of this AGREEMENT. Contractor shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines.

Page 303 of 388 ends

2 3.2 Responsibilities of Contractor.

3.2.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Contractor or under its supervision. Contractor will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Contractor on an independent contractor basis and not as an employee. Contractor retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation insurance.

3.2.2 Schedule of Services. Contractor shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services incorporated herein by reference. Contractor represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions.

In order to facilitate Contractor’s conformance with the Schedule, City shall respond to Contractor’s submittals in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services.

3.2.3 Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City.

3.2.4 City’s Representative. The City hereby designates the Director of Public Works, or his designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Agreement. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.2.5 Contractor’s Representative. Contractor hereby designates Vincenzo G.

Violi, – President, or his designee, to act as its representative for the performance of this Agreement (“Contractor’s Representative”). Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement. The Contractor’s Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.

3.2.6 Coordination of Services. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City’s staff, consultants and other staff at all reasonable times.

3.2.7 Standard of Care; Performance of Employees. Contractor shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Services. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience

Page 304 of 388 ends

3 to perform the Services assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor’s failure to comply with the standard of care provided for herein. Any employee of the Contractor or its sub-contractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be reemployed to perform any of the Services or to work on the Project.

3.2.7.1 Period of Performance and Liquidated Damages.

Contractor shall perform and complete all services under this Agreement within the term set forth in Section 3.1.2 above (“Performance Time”). Contractor shall perform the Services in strict accordance with any completion schedule identified by the City for each on-call service requested by the City, or which may be provided separately in writing to the Contractor. Contractor agrees that if the Services are not completed within the aforementioned Performance Time and/or pursuant to any such completion schedule agreed to by the City and Contractor and developed pursuant to provisions of this Agreement, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum of $250.00 per day for each day of delay beyond the specified start time or beyond any completion schedule established pursuant to this Agreement.

3.2.8 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Services. If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.2.9 Insurance. Throughout the life of this Contract, Contractor shall pay for and maintain in full force and effect all policies of insurance required hereunder with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated not less than "A- VII" in Best's Insurance Rating Guide, or (ii) as may be authorized in writing by City Manager or his/her designee at any time and in his/her sole discretion. The following policies of insurance are required:

Page 305 of 388 ends

4 (i) COMMERCIAL GENERAL LIABILITY insurance which shall be at least as broad as the most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01 and include insurance for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and nonowned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Contract) with limits of liability of not less than the following:
$5,000,000 per occurrence for bodily injury and property damage $1,000,000 per occurrence for personal and advertising injury $10,000,000 aggregate for products and completed operations $10,000,000 general aggregate
(ii) COMMERCIAL AUTOMOBILE LIABILITY insurance which shall be at least as broad as the most current version of Insurance Service Office (ISO) Business Auto Coverage Form CA 00 01, and include coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1 - Any Auto) with limits of liability of not less than $5,000,000 per accident for bodily injury and property damage.
(iii) WORKERS' COMPENSATION insurance as required under the California Labor Code.
(iv) EMPLOYERS’ LIABILITY insurance with limits of liability of not less than $1,000,000 each accident, $1,000,000 disease policy limit and $1,000,000 disease each employee.
(v) BUILDERS RISK (Course of Construction) insurance in an amount equal to the completed value of the project with no coinsurance penalty provisions. (Only required if the project includes new construction of a building; or renovation of, or addition to, an existing building.) (vi) CONTRACTORS POLLUTION LIABILITY (Unless waived in
writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is required for all environmental and water remediation work and for all work transporting fuel. Unless waived in writing by the City Manager or his/her designee in his/her sole discretion, Contractors Pollution Liability is also required for demolition, renovation, HVAC, plumbing or electrical (including, without limitation, lighting) work on any structure built prior to the year 1990.) insurance with limits of liability of not less than the following:
$5,000,000 per occurrence or claim
$10,000,000 general or policy aggregate
In the event Contractor purchases an Umbrella or Excess insurance policy(ies) to meet

Page 306 of 388 ends

5 the minimum limits of insurance set forth above, this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies).

Should this Contract involves any lead based, mold or asbestos environmental hazard, either the Automobile Liability insurance policy or the Contractors Pollution Liability insurance policy shall be endorsed to include Transportation Pollution Liability insurance covering materials to be transported by Contractor pursuant to the Contract.

In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental hazards. In the event this Contract involves any asbestos environmental hazard (e.g., asbestos remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for asbestos environmental hazards. In the event this Contract involves any mold environmental hazard (e.g., mold remediation), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for mold environmental hazards and “microbial matter including mold” within the definition of “Pollution” under the policy.

Contractor shall be responsible for payment of any deductibles contained in any insurance policies required hereunder and Contractor shall also be responsible for payment of any self-insured retentions. Any deductibles or self-insured retentions must be declared to, and approved by, the City Manager or his/her designee in his/her sole discretion. At the option of the City Manager or his/her designee, either (i) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees and agents; or (ii) Contractor shall provide a financial guarantee, satisfactory to the City Manager or his/her designee in his/her sole discretion, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall City be responsible for the payment of any deductibles or self-insured retentions.

All policies of insurance required hereunder shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after 30 calendar day written notice has been given to City. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, Contractor shall furnish City with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for City, Contractor shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than 15 calendar days prior to the expiration date of the expiring policy.

The General Liability and Automobile Liability insurance policies shall be written on an occurrence form. The Contractors Pollution Liability insurance policy shall be written on either an occurrence form, or a claims-made form. The General Liability (including ongoing operations and products/completed operations), Automobile Liability and Contractors Pollution Liability insurance policies shall name City, its officers, officials, employees and agents as an additional insured. All such policies of insurance shall be endorsed so Contractor’s insurance shall be primary and no contribution shall be required of City, its officers, officials, employees and agents. The Builders Risk (Course

Page 307 of 388 ends

6 of Construction) insurance policy shall be endorsed to name the City as a loss payee.

Any Workers’ Compensation insurance policy shall contain a waiver of subrogation as to City, its officers, officials, employees and agents. The coverage(s) shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees and agents. Should Contractor maintain insurance with broader coverage and/or limits of liability greater than those shown above, City requires and shall be entitled to the broader coverage and/or the higher limits of liability maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.

Claims-Made Policies - If any coverage required is written on a claims-made coverage form:
(i) The retroactive date must be shown, and must be before the effective date of the Contract or the commencement of work by Contractor. (ii) Insurance must be maintained and evidence of insurance must be provided for at least 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iii) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the effective date of the Contract, or work commencement date, Contractor must purchase extended reporting period coverage for a minimum of 5 years after completion of the work or termination of the Contract, whichever first occurs.
(iv) A copy of the claims reporting requirements must be submitted to City for review.
(v) These requirements shall survive expiration or termination of the Contract.

Contractor shall furnish City with all certificate(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the City’s Risk Manager or his/her designee in his/her sole discretion prior to City’s execution of the Contract and before work commences. Upon request of City, Contractor shall immediately furnish City with a complete copy of any insurance policy required under this Contract, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Contract.

If at any time during the life of the Contract or any extension, Contractor or any of its subcontractors fail to maintain any required insurance in full force and effect, all work under this Contract shall be discontinued immediately, and all payments due or that become due to Contractor shall be withheld until notice is received by City that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to City. Any failure to maintain the

Page 308 of 388 ends

7 required insurance shall be sufficient cause for City to terminate this Contract. No action taken by City hereunder shall in any way relieve Contractor of its responsibilities under this Contract.

The fact that insurance is obtained by Contractor shall not be deemed to release or diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this Contract. The duty to indemnify City shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Contractor, its principals, officers, agents, employees, persons under the supervision of Contractor, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them.

In the event of a partial or total destruction by the perils insured against of any or all of the work and/or materials herein provided for at any time prior to the final completion of the Contract and the final acceptance by the City of the work or materials to be performed or supplied thereunder, the Contractor shall promptly reconstruct, repair, replace, or restore all work or materials so destroyed or injured at his/her sole cost and expense. Nothing herein provided for shall in any way excuse the Contractor or his/her insurance company from the obligation of furnishing all the required materials and completing the work in full compliance with the terms of the Contract.

3.2.10 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In constructing the Project, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.2.11 Bonds.

3.2.11.1 Performance Bond. Contractor shall execute and provide to City concurrently with this Agreement a Performance Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City.

3.2.11.2 Payment Bond. Contractor shall execute and provide to City concurrently with this Agreement a Payment Bond in the amount of the total, not-toPage 309 of 388 8 exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by City.

3.2.11.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this section are accepted by the City. To the extent, if any, that the total compensation is increased in accordance with the Agreement, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. To the extent available, the bonds shall further provide that no change or alteration of the Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Agreement for cause.

3.2.11.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the City. If a California admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.3 Fees and Payments.

3.3.1 Compensation. Contractor shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit B attached hereto and incorporated herein by reference. The Services shall be performed on an “as needed” basis, and the City shall issue a purchase order for said “as needed” services. Extra work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement. The total contract shall be in the “not to exceed” amount of $150,000 annually for the term of the contract.

3.3.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement which indicates work completed and hours of Services rendered by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

Page 310 of 388 ends

9 3.3.3 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

3.3.5 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.4 Accounting Records.

3.4.1 Maintenance and Inspection. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services

Page 311 of 388 ends

10 which have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Agreement except for cause.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request.

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the follow address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor:

Xylem Dewatering Solutions dba Wachs Water Services
8920 State Route 108, Suite D
Columbia, MD 21045
Attention: Vincenzo G. Violi
City:

City of Norco
2870 Clark Avenue
Norco, CA 92860
Attention: Director of Public Works
Such notice shall be deemed made when personally delivered or when mailed, fortyeight (48) hours after deposit in the US Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.4 Attorney’s Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney’s fees and all other costs of such action.

3.5.5 Indemnification. To the furthest extent allowed by law including California Civil Code section 2782, Contractor shall indemnify, hold harmless and

Page 312 of 388 ends

11 defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage) incurred by City, Contractor or any other person, and from any and all claims, demands and actions in law or equity (including attorney's fees and litigation expenses), arising or alleged to have arisen directly or indirectly out of performance of this Contract. Contractor's obligations under the preceding sentence shall apply regardless of whether City or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of City or any of its officers, officials, employees, agents or volunteers.

If Contractor should subcontract all or any portion of the work to be performed under this Contract, Contractor shall require each subcontractor to indemnify, hold harmless and defend City and each of its officers, officials, employees, agents and volunteers in accordance with the terms of the preceding paragraph.

This section shall survive termination or expiration of this Contract

3.5.6 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.7 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County.

3.5.8 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.9 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project.

3.5.10 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.11 Assignment or Transfer. Contractor shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.12 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Contractor include all

Page 313 of 388 ends

12 personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement.

The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content or intent of this Agreement.

3.5.13 Amendment; Modification. No supplement, modification or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.14 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

3.5.15 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.5.16 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.17 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Contractor further agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.18 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.19 Labor Certification. By its signature hereunder, Contractor certifies that it is aware of the provisions of Section 3700 of the California Labor Code which

Page 314 of 388 ends

13 require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.20 Authority to Enter Agreement. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.21 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Contractor shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

Page 315 of 388 ends

14 Name of Contractor: Xylem Dewatering Solutions, Inc. dba Wachs Water Services *By:
_________________________
Signature
Vincenzo G. Violi– President
NOTE: SIGNATURES OF CORPORATE OFFICIALS MUST BE NOTARIZED.

Attach Certificate of Notary Acknowledgement
OWNER: CITY OF NORCO, a municipal corporation
*By:
__________________________
Greg Newton, Mayor
ATTEST:
__________________________
Dana Roa, CMC, City Clerk
APPROVED AS TO FORM:
__________________________
Colin Burns, City Attorney

Page 316 of 388 ends

15 EXHIBIT A
Scope of Services
(see attachments)

Page 317 of 388 ends

16 EXHIBIT B
Proposal of Services
(see attachments)

Page 318 of 388 ends

17 CONTRACT PERFORMANCE BOND
(CALIFORNIA PUBLIC WORK)
KNOW ALL MEN BY THESE PRESENT:

THAT WHEREAS, the City of Norco (sometimes referred to hereinafter as “Obligee”) has awarded to
___________________________________________________________ ___________________________________________________________ (hereinafter designated as the “Contractor”), an agreement for the work described as follows:

WATER VALVE AND HYDRANT ASSESSMENT SERVICES
The general items of work to be done hereunder consist of:

The City of Norco desires to initiate a Water Valve and Hydrant Assessment Services Agreement which serves three primary purposes.

First, to evaluate and improve the operability of valves in the water distribution system through hands on field activities, second, to document, integrate and analyze locational, operational and physical information of valves in the water distribution system through professional services activities and third to define and refine the scope and value of an ongoing system wide program through consulting activities.
(hereinafter referred to as the “Public Work”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in that certain contract for the said Public Work dated ___________________, (hereinafter referred to as the “Contract”), which Contract is incorporated herein by this reference; and
WHEREAS, the Contractor is required by said Contract to perform the terms thereof and to provide a bond both for the performance and guaranty thereof.

NOW, THEREFORE, we, ____________________________________________, the undersigned Contractor, as Principal, and ____________________________________ ________________________________, a corporation organized and existing under the laws of the State of____________, and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Norco in the sum of ______________________________________________________ Dollars ($ _________________), said sum being not less than 100 percent of the total amount payable by the said Obligee under the terms to the said Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if the bounden Contractor, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and

Page 319 of 388 ends

18 agreements in the said Contract and any alteration thereof made as therein provided, on his or its parts, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill the one year guarantee of all materials and workmanship; and indemnify and save harmless the Obligee, its officers and agents, as stipulated in said Contract, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration of addition to the terms of the Contract, or to the work or to the Specifications.

No final settlement between the Obligee and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

Contractor and Surety agree that if the Obligee is required to engage the services of an attorney in connection with enforcement of the bond, each shall pay Obligee’s reasonable attorney’s fees incurred, with or without suit, in addition to the above sum.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this ____ day of _________, 2025.

PRINCIPAL/CONTRACTOR:
_________________________________
By: ______________________________
SURETY:
_________________________________
By: ______________________________
Attorney-in-Fact

Page 320 of 388 ends

19 The rate of premium on this bond is _________________________ per thousand.

The total amount of premium charged: $_____________________________________ (The above must be filled in by corporate surety).

IMPORTANT: Surety companies executing bonds must possess a certificate of authority from the California Insurance Commissioner authorizing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the work or project is financed, in whole or in part, with Federal, grant, or loan funds, it must also appear on the Treasury Department’s most current list (Circular 570 as amended). THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:
(Name and Address of Surety) ________________________________ ________________________________
________________________________
(Name and Address of Agent or ________________________________ Representative for service of
process in California if ________________________________ different from above)
________________________________
(Telephone Number of Surety and ________________________________ Agent or Representative for
service of process in California) ________________________________ ________________________________

Page 321 of 388 ends

20 STATE OF CALIFORNIA )
) ss.

COUNTY OF )
On this ____ day of ___________, in the year _________, before me, ______________________, a Notary Public in and for said State, personally appeared ____________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-in-Fact of the _________________________ (Surety) and acknowledged to me that he subscribed the name of the ______________________________ (Surety) thereto and his own name as Attorney-in-Fact.

Notary Public in and for said
State
(SEAL)
Commission expires:______________________________
NOTE:

A copy of the Power of Attorney to local representatives of the bonding company must be attached hereto.

Page 322 of 388 ends

21 PAYMENT BOND
(CALIFORNIA PUBLIC WORK)
KNOW ALL MEN BY THESE PRESENT:

THAT WHEREAS, the City of Norco (sometimes referred to hereinafter as Obligee” has awarded to ____________________________________________________________ __________________________________(hereinafter designated as the “Contractor”), an agreement dated________________________________, described as follows:

WATER VALVE AND HYDRANT ASSESSMENT SERVICES
The general items of work to be done hereunder consist of:

The City of Norco desires to initiate a Water Valve and Hydrant Assessment Services Agreement which serves three primary purposes.

First, to evaluate and improve the operability of valves in the water distribution system through hands on field activities, second, to document, integrate and analyze locational, operational and physical information of valves in the water distribution system through professional services activities and third to define and refine the scope and value of an ongoing system wide program through consulting activities.
(hereinafter referred to as the “Contract”) and
WHEREAS, said Contractor is required to furnish a bond in connection with said Contract and pursuant to Section 3247 of the California Civil Code; NOW, THEREFORE, We, _______________________________________________, the undersigned Contractor, as Principal; and
__________________________________
______________________________________________________________________ _
a corporation organized and existing under the laws of the State of __________________, and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Norco and to any and all persons, companies, or corporations entitled to file stop notices under Section 3181 of the California Civil Code, in the sum of _________________________________________________ Dollars ($ _________________), said sum being not less than 100 percent of the total amount payable by the said Obligee under the terms of the said Contract, for which payment will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if said Contractor, his or its heirs, executors, administrators, successors, or assigns, or SubContractors, shall fail to pay for any materials, provisions or other supplies, implements, machinery, or power

Page 323 of 388 ends

22 used in, upon, for, or about the performance of the Public Work contracted to be done, or to pay any person for any work or labor of any kind, or for bestowing skills or other necessary services thereon, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of paid Contractor and his SubContractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor as required by the provisions of Section 3247 through 3252 of the Civil Code, the Surety or Sureties hereon will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In addition to the provisions herein above, it is agreed that this bond will insure to the benefit of any and all persons, companies, and corporations entitled to serve stop notices under Section 3181 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or additions to the terms of the said Contract or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract or to the work or to the Specifications.

No final settlement between the Obligee and the Contractor hereunder shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

Contractor and Surety agree that if the Obligee is required to engage the services of an attorney in connection with the enforcement of this bond, each shall pay Obligee’s reasonable attorney’s fees incurred, with or without suit, in addition to the above sum.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _____day of_______________, 2025.

PRINCIPAL/CONTRACTOR:
_____________________________________
By: __________________________________
SURETY:
_____________________________________
By: __________________________________
Attorney-in-Fact

Page 324 of 388 ends

23 The rate of premium on this bond is ________________________ per thousand.

The total amount of premium charged: $ _____________________________________ (The above must be filled in by corporate Surety).

IMPORTANT: Surety companies executing bonds must possess a certificate of authority from the California Insurance Commissioner authorizing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the work or project is financed, in whole or in part, with Federal, grant, or loan funds, it must also appear on the Treasury Department’s most current list (Circular 570 as amended). THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:
(Name and Address of Surety) _______________________________ _______________________________
_______________________________
(Name and Address of Agent or _______________________________ Representative for service of
process in California if _______________________________ different from above)
_______________________________
(Telephone Number of Surety and _______________________________ Agent or Representative for
service of process in California _______________________________ _______________________________

Page 325 of 388 ends

24 STATE OF CALIFORNIA )
) ss.

COUNTY OF )
On this ________ day of _________________, in the year _________, before me, ________________________, a Notary Public in and for said State, personally appeared _____________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-in-Fact of the _____ ___________________ (Surety) and acknowledged to me that he subscribed the name of the _________________________________ (Surety) thereto and his own name as Attorney-in-Fact.
_____________________________________
Notary Public in and for said State
(SEAL)
Commission expires:________________________
NOTE:

A copy of the Power of Attorney to local representatives of the bonding company must be attached hereto.

Page 326 of 388 ends

25 GENERAL LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5632
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ Policy Number _____________________

2. Policy Term (From) _______________ (To)________________ Endorsement Effective Date ______________________________________

3. Named Insured _______________________________________________

4. Address of Named Insured
_____________________________________________________________ _____________________________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________________ /_____________________________

6. Deductible or Self-Insured Retention (Nil unless otherwise specified):
______________________________________________

7. Coverage is equivalent to:

Comprehensive General Liability Form GL0002 (Ed. 1/73)
______________________________________________
Commercial General Liability “Occurrence” Form CG0001
______________________________________________

8. Bodily Injury and Property Damage Coverage is:
____________________________________”occurrence”
Note: The City of Norco standard insurance requirements specify “occurrence” coverage. “Claims-made” coverage is not acceptable. If commercial general liability form or equivalent is used, the general aggregate must apply separately to this location/project or the general aggregate must be twice the occurrence limit.

Page 327 of 388 ends

26 B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. As respects any work performed on the above described Project, the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, and volunteers are included as insured with regard to damages and defense of claims arising from: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, or (c) premises owned, leased, or used by the Named Insured.

2. CONTRIBUTION NOT REQUIRED. As respects: (a) work performed by the Named Insured on the above described Project for or on behalf of the City of Norco; or (b) products sold by the Named Insured to the City of Norco for use on the Project; or (c) premises leased by the Named Insured from the City of Norco, the insurance afforded by this policy shall be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers; or stand in an unbroken chain of coverage excess of the Named Insured’s schedule underlying primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees, consulting engineers, or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage at least as broad as:
(1) Insurance Services Office Form Number GL 0002 (Ed. 1/73), Comprehensive General Liability Insurance and Insurance Services Office form number GL 0404 Broad Form Comprehensive General Liability endorsement; or
(2) Insurance Services Office Commercial General Liability Coverage, “Occurrence” Form CG 0001; or
(3) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Sections (1) and (2).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respects to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall

Page 328 of 388 ends

27 not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
______________________________
(Telephone Number)
D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to bind the below-listed (Print/Type Name)
insurance company and by my signature hereon do so bind this company. ____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________

Page 329 of 388 ends

28 TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________________________

Page 330 of 388 ends

29 AUTOMOBILE LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5632
A. POLICY INFORMATION Endorsement #_____________________

1. Insurance Company _____________________________________________ Policy Number _____________________

2. Policy Term (From)________________(To) _______________ Endorsement Effective Date ___________

3. Named Insured________________________________________________

4. Address of Named Insured________________________________________

5. Limit of Liability Any One Occurrence/Aggregate
$______________________ /_____________________________________

6. Deductible or Self-Insured Retention
(Nil unless otherwise specified):
$____________________________________________________________ B. POLICY AMENDMENTS
This endorsement is issued in consideration of the policy premium. Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:

1. INSURED. The City of Norco, its elected or appointed officers, officials, consulting engineers, employees and volunteers are included as insured with regard to damages and defense of claims arising from: the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or volunteers.

2. CONTRIBUTION NOT REQUIRED. As respects work performed by the Named Insured for or on behalf of the City of Norco, the insurance afforded by this policy shall: (a) be primary insurance as respects the City of Norco, its elected or appointed officers, officials, employees, consulting engineers or

Page 331 of 388 ends

30 volunteers; or (b) stand in an unbroken chain of coverage excess of the Named Insured’s primary coverage. In either event, any other insurance maintained by the City of Norco, its elected or appointed officers, officials, employees or volunteers shall be in excess of this insurance and shall not contribute with it.

3. SCOPE OF COVERAGE. This policy, if primary, affords coverage to the Named Insured at least as broad as:
(1) Insurance Services Office form number CA 00001 (Ed. 1/78), Code 1 (“any auto”) and endorsement CA 0025.
(2) If excess, affords coverage which is at least as broad as the primary insurance forms referenced in the preceding Section (1).

4. SEVERABILITY OF INTEREST. The insurance afforded by this policy applies separately to each insured who is seeking coverage, or against whom a claim is made or a suit is brought, except with respect to the Company’s limit of liability.

5. PROVISIONS REGARDING THE INSURED’S DUTIES AFTER ACCIDENT OR LOSS. Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the City of Norco, its elected or appointed officer, officials, employees, consulting engineers or volunteers.

6. CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.

C. INCIDENT AND CLAIM REPORTING PROCEDURE
Incidents and claims are to be reported to the insurer at:

ATTN:
_____________________________________________________________________ (Title) (Department)
_____________________________________________________________________ (Company)
_____________________________________________________________________ (Street Address)
_____________________________________________________________________ (City) (State) (Zip Code)
____________________________________________________
(Telephone Number)

Page 332 of 388 ends

31 D. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, __________________________, warrant that I have authority to bind the below-listed (Print/Type Name)
insurance company and by my signature hereon do so bind this company. ____________________________________________

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original Signature required on endorsement furnished to the City of Norco) ORGANIZATION: _____________________________________________________ TITLE: _____________________________________________________ ADDRESS: _____________________________________________________ _____________________________________________________
TELEPHONE: _____________________________________

Page 333 of 388 ends

32 WORKER’S COMPENSATION/EMPLOYER’S LIABILITY ENDORSEMENT

CITY OF NORCO
2870 Clark Avenue
Norco, CA 92860
(951) 270-5632
A. POLICY INFORMATION Endorsement # ________________________

1. Insurance Company ____________________________________________ (“the Company”)
Policy Number _________________________________________________

2. Effective Date of this Endorsement ________________________________

3. Named Insured_________________________________________________

4. Employer’s Liability Limit (Coverage B)______________________________ _____________________________________________________________ B. POLICY AMENDMENTS
In consideration of the policy premium and notwithstanding any inconsistent statement in the policy to which this endorsement is attached or any other endorsement attached thereto, it is agreed as follows:
(1) Cancellation Notice. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after 30 days prior written notice by certified mail return receipt requested has been given to the City of Norco. Such notice shall be addressed as shown in the heading of this endorsement.
(2) Waiver of Subrogation. The Insurance Company agrees to waive all rights of subrogation against the City of Norco, its elected or appointed officers, officials, agents and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the City of Norco.

Page 334 of 388 ends

33 C. SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE

INSURER
I, _______________________, warrant that I have authority to bind the below-listed (Print/Type Name)
insurance company and by my signature hereon do so bind this company.

SIGNATURE OF AUTHORIZED REPRESENTATIVE
(Original signature required on endorsement furnished to the City of Norco) ORGANIZATION: ____________________________________________________ TITLE: ____________________________________________________ ADDRESS: ____________________________________________________ TELEPHONE: ____________________________________________________

Page 335 of 388 ends

34

Page 336 of 388 ends

35

Page 337 of 388 ends

36

Page 338 of 388 ends

37

Page 339 of 388 ends

City Council

STAFF REPORT
Date: August 6, 2025 Agenda Item:

3.H.

To: Honorable Mayor and City Council Members
From: Sam Nelson, Interim Public Works Director
Prepared By: Victor So, Senior Civil Engineer
Department: Public Works
SUBJECT:

Acceptance of the 2024-25 Equestrian Trail Fencing Replacement Project as Complete RECOMMENDATION:

Accept the 2024-25 Equestrian Trail Fencing Replacement Project as complete and authorize the City Clerk to file the Notice of Completion with the County of Riverside.

SUMMARY:

The 2024-25 Equestrian Trail Fencing Replacement Project consisted of trail fence improvements in various locations throughout the City.

BACKGROUND:

On December 18, 2024, the City Council awarded a contract to Country Estate Fence Co., Inc. in the amount of $378,831 and authorized the City Manager to approve contract change orders up to 10% for the 2024-25 Equestrian Trail Fencing Replacement Project. The final contract amount paid to Country Estate Fence Co., Inc. was $347,304. The reduced amount paid to the contractor was due to less linear footage of both fence removals and installations.

Country Estate Fence Co., Inc. has completed all the work required to the satisfaction of the City Engineer and a Notice of Completion has been prepared for recordation.

FISCAL IMPACT:

There is no fiscal impact for this item.

RELATIONSHIP TO STRATEGIC PLAN:

Page 340 of 388 ends

The approval of Notice of Completion is consistent with Strategic Direction #5 – Infrastructure and Asset Management: Ensure timely preservation, replacement, improvement and acquisition of infrastructure and capital assets.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Joshua Calhoun, Finance Director Approved by: Lisette Free, City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Notice of Completion_2024-25 Equestrian Trail Fencing Replacement Project

Page 341 of 388 ends

RECORDING REQUESTED BY: THIS DOCUMENT IS FILED AT THE REQUEST

REQUEST CITY OF NORCO OF THE CITY OF NORCO PURSUANT TO
WHEN RECORDED MAIL TO: SECTION 6103 OF THE GOVERNMENT
2870 CLARK AVENUE CODE. NO FEE IS CHARGED THEREFORE.

NORCO, CA 92860
ATTN: CITY CLERK

NOTICE OF COMPLETION

NOTICE IS HEREBY GIVEN BY THE CITY OF NORCO, A MUNICIPAL CORPORATION, STATE OF CALIFORNIA THAT THE WORK DESCRIBED AS 2024-25 EQUESTRIAN TRAIL FENCING REPLACEMENT PROJECT IN THE CITY OF NORCO IN

ACCORDANCE WITH THE TERMS AND WRITTEN CONTRACT DATED BETWEEN THE CITY OF NORCO AND COUNTRY ESTATE FENCE CO., INC. WAS COMPLETED AND ACCEPTED BY THE CITY OF NORCO ON THE SIXTH DAY OF AUGUST, 2025.

THE WORK DONE: CONSISTED OF TRAIL FENCE IMPROVEMENTS IN VARIOUS LOCATIONS THROUGHOUT THE CITY. (PROJECT NO. 54600.8)
THAT THE CITY OF NORCO, A PUBLIC BODY, CORPORATE AND POLITIC, WHOSE ADDRESS IS 2870 CLARK AVENUE, NORCO, CALIFORNIA, 92860 IS THE OWNER OF SAID IMPROVEMENT WORK; AND THAT SAID WORK WAS PERFORMED BEGINNING DECEMBER 18, 2024, IN THE CITY OF NORCO. THE NATURE OF INTEREST IS VENDEE UNDER CONTRACT.

THAT SAID WORK OF IMPROVEMENT WAS SO PERFORMED BY COUNTRY ESTATE FENCE CO., INC. IN ACCORDANCE WITH SAID WRITTEN AGREEMENT DATED DECEMBER 18, 2024, AND THE DRAWINGS AND SPECIFICATIONS WHICH WERE A PART OF SAID CONTRACT.

THIS NOTICE OF COMPLETION IS GIVEN BY THE CITY OF NORCO PURSUANT TO THE APPROPRIATE PROVISIONS OF TITLE XV, PART IV, DIVISION 1 OF THE CIVIL CODE OF THE STATE OF CALIFORNIA, AND UPON ORDER OF THE CITY OF NORCO.

AUGUST 06, 2025
DATED:

CITY OF NORCO

A MUNICIPAL CORPORATION
BY: __________________________

DANA ROA, CMC

CITY CLERK
VERIFICATION FOR NON-INDIVIDUAL OWNER:

I, THE UNDERSIGNED, DECLARE UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT I AM THE CITY CLERK OF THE CITY OF NORCO; THAT I HAVE SIGNED THE SAID NOTICE, THAT I KNOW AND UNDERSTAND THE CONTENTS THEREOF, AND THAT THE FACTS STATED THEREIN ARE TRUE AND CORRECT.

AUGUST 06, 2025 ______________________________

DATE DANA ROA, CMC

CITY CLERK

CITY OF NORCO

Page 342 of 388 ends

City Council

STAFF REPORT
Date: August 6, 2025 Agenda Item:

3.I.

To: Honorable Mayor and City Council Members
From: Lisette Free, City Manager
Prepared By: Dana Roa, City Clerk
Department: Administration
SUBJECT:

Adoption of Resolution 2025-54 to Authorize Participation in the National Opioid Settlements
RECOMMENDATION:

Adopt Resolution 2025-54 to Authorize Participation in the National Opioid Settlements.

SUMMARY:

A new national opioid settlement has been reached with Alvogen, Amneal, Apotex, Hikma, Indivior, Mylan, Sun, and Zydu. In order for the City of Norco to receive compensation related to the new settlement with Alvogen, Amneal, Apotex, Hikma, Indivior, Mylan, Sun, and Zydu the City must "opt in" to participate.

BACKGROUND:

In 2022, the City of Norco opted to participate in the Janssen Distributors Opioid Settlement Agreement. In 2024, the City also joined the Kroger Settlement Agreement.

Previous funds received have been allocated for specific purposes related to the opioid epidemic, such as purchasing Naloxone (Narcan) or other FDA-approved drugs to reverse opioid overdoses, and providing training and education, among other uses.

A new nationwide settlement agreement ("Settlement") has been reached to resolve the legal claims of states and local political subdivisions against Alvogen, Amneal, Apotex, Hikma, Indivior, Mylan, Sun, and Zydu, related to alleged opioid misconduct.

The Settlement requires these companies to pay over a billion dollars to combat the opioid epidemic. Of this amount, approximately $720 million will be used by participating states and subdivisions to mitigate the impacts of the opioid crisis. Depending on participation, the Settlement mandates payments over eleven years from its effective date.

Page 343 of 388 ends

Additionally, the Settlement includes injunctive relief governing opioid dispensing and requires each company to implement proactive safeguards to prevent the diversion of prescription opioids.

The proposed settlement involves two key participation steps:
 Each eligible state decides whether to participate in the Settlement.  Eligible subdivisions within each participating state must decide whether to join the Settlement. The more subdivisions that participate, the more funds flow to that state and its subdivisions. Subdivisions that do not participate cannot directly share in the settlement funds, even if their state is participating. If a state does not participate, its subdivisions are not eligible to join the Settlement.

The state of California has elected to participate in the Settlement, allowing the City of Norco, as a subdivision, to participate as well.

The funds received from this new settlement, along with previous funds, will be used to support City Programs addressing the opioid epidemic and to increase awareness among parents, grandparents, and other caregivers about their responsibilities in helping young people avoid the negative consequences of drug use.

FISCAL IMPACT:

The fiscal impact is currently undetermined. The extent of the impact will depend on the level of participation by states and their subdivisions. As more subdivisions participate, the flow of funds to the state and its subdivisions will increase accordingly.

RELATIONSHIP TO STRATEGIC PLAN:

This item closely relates to Strategic Direction No. 1, Public Health, Safety and Wellness: Enhance quality of life by promoting public health, safety and wellness initiatives for all community members.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Joshua Calhoun, Finance Director Approved by: Lisette Free, City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Resolution No 2025-54 Opiod Settlement Participation
National Opioids Settlement Overview

Page 344 of 388 ends

RESOLUTION 2025-54

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORCO, CALIFORNIA, TO

AUTHORIZE PARTICIPATION IN OPIOID SETT LEMENT AGREEMENT WHEREAS, proposed nationwide settlement agreements (“Settlement Agreements”) have been reached with eight opioid manufacturers to wit: Alvogen, Inc.

Amneal Pharmaceuticals, Inc., Apotex, Inc., Hikma Pharmaceuticals USA, Inc., Indivio, Inc., Mylan Pharmaceuticals, Inc., Sun Pharmaceutical Industries, Inc., and Zydus Pharmaceuticals (USA), Inc. (the “Manufacturers”);
WHEREAS, the details of each said settlement may be reviewed at https://nationalopioidsettlement.com/additional-settlements/; WHEREAS, the Settlement Agreements provide participants with funds to be used for the purpose of mitigating the effects of opioid abuse in their respective communities;
WHEREAS, the Attorney General of the State of California has approved participation in the Settlement Agreements;
WHEREAS, it appears in the best interests of the City of Norco to participate in the Settlement Agreements and receive and use settlement funds for the purpose of mitigating the effects of opioid abuse in this community; NOW THEREFORE BE IT RESOLVED, that the Mayor and Council of the City of Norco hereby authorize the City of Norco to participate in the Settlement Agreements; BE IT FURTHER RESOLVED, that the City Manager and Finance Director of the City of Norco are hereby authorized to execute all documents as may be required to opt in to the Settlement Agreements;
BE IT FURTHER RESOLVED, that the City Manager and Finance Director of the City of Norco be, and hereby are, authorized and empowered to take other such actions and to execute for and on behalf of the City any other such documents in connection with said transaction, including the filing of any required reports, along with such other documents, instruments, certificates, assignments, and papers which, in the judgment of the City Manager or Finance Director, may be necessary and desirable to effect the proposed transaction. Such agreements, instruments, certificates, assignments, papers and/or documents shall be in such form and contain such terms and conditions as may be approved by the City Manager and Finance Director on behalf of the City in accordance with this Resolution, and the execution of such agreements, instruments, certificates, assignments, papers, and documents by the City Manager and Finance Director on behalf of the City are herein authorized and shall be conclusive evidence of any such approval.

BE IT FURTHER RESOLVED, that all acts and doings of the City Manager and Finance Director in connection with the proposed transaction which are in conformity with the purposes and intents of these Resolutions and in furtherance of the transaction contemplated hereby and thereby shall be, and the same hereby are, in all respects approved and confirmed. Page 345 of 388
Resolution 2025-54 – National Opioid Settlement Participation

Page 2 ends

August 6, 2025
BE IT FURTHER RESOLVED, that the signature of the City Manager and Finance Director to any of the consents, agreements, instruments, certificates, assignments, papers, and documents executed and delivered in connection therewith shall be conclusive evidence of the authority of the same to execute and deliver such consents, agreements, instruments, certificates, assignments, papers, and other documents on behalf of the City.

BE IT FURTHER RESOLVED, that the City Clerk or any Deputy Clerk of the City of Norco be, and each hereby is, authorized to attest the signature of any officer of the City of Norco and impress or attest the City of Norco’s seal appearing on any agreement, instrument, certificate, financing statement, assignment, paper or document executed in connection with any of the foregoing Resolutions, but shall not be obligated to do so, and the absence of the signature of the City Clerk or any Deputy Clerk of the City or the City’s seal on any such document shall not affect its validity or the obligation of the Mayor and Council thereunder.

BE IT FURTHER RESOLVED, that all resolutions or parts thereof of the City of Norco in conflict with the provisions herein contained are, to the extent of such conflict, hereby superseded and repealed;
BE IT FURTHER RESOLVED, that these Resolutions shall take effect immediately upon their adoption.

PASSED AND ADOPTED by the City Council of the City of Norco, California, at a regular meeting held August 6, 2025.

CITY OF NORCO, CALIFORNIA
Greg Newton, Mayor
ATTESTED TO:

Dana Roa, CMC, City Clerk

Page 346 of 388 ends

Resolution 2025-54 – National Opioid Settlement Participation

Page 2 ends

August 6, 2025
I, Dana Roa, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Resolution was regularly introduced and adopted by the City Council of the City of Norco, California, at a regular meeting thereof held on August 6, 2025, by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Norco, California on August 6, 2025.

Dana Roa, CMC, City Clerk
City of Norco, California

Page 347 of 388 ends

National Opioids Settlements: Alvogen, Amneal, Apotex, Hikma, Indivior, Mylan, Sun, Zydus Opioids Implementation Administrator
[email protected]
Norco city, CA
Rubris Reference Number: CL-1761426
TO LOCAL POLITICAL SUBDIVISIONS AND SPECIAL DISTRICTS:

THIS NOTICE CONTAINS IMPORTANT INFORMATION ABOUT NATIONAL OPIOID SETTLEMENTS.

SETTLEMENT OVERVIEW
Proposed nationwide settlement agreements (“Settlements”) have been reached that would resolve opioid litigation brought by states, local political subdivisions, and special districts against eight opioids manufacturers, Alvogen, Amneal, Apotex, Hikma, Indivior, Mylan, Sun, and Zydus (the “Manufacturers”). Local political subdivisions and special districts are referred to as “subdivisions.”
The Settlements require the settling Manufacturers to pay hundreds of millions of dollars to abate the opioid epidemic. The Settlements will provide a maximum of approximately $720 million in cash to participating states and subdivisions to remediate and abate the impacts of the opioid crisis. Depending on participation by states and subdivisions, the Settlements require:
 Alvogen to immediately pay up to approximately $19 million;  Amneal to pay up to approximately $74 million over 10 years, and to provide either approximately $177 million of its generic version of the drug Narcan or up to an additional approximately $44 million in cash;
 Apotex to immediately pay up to approximately $65 million;  Hikma to immediately pay up to approximately $98 million, and to provide either approximately $35 million of its naloxone product or up to an additional approximately $7 million in cash;
 Indivior to pay up to approximately $75 million over five years, a portion of which, at the election of the state, could be paid in the form of Indivior’s branded buprenorphine and/or nalmefene products with a value of up to $140 million.;  Mylan to pay up to approximately $290 million over nine years;  Sun to immediately pay up to approximately $32 million; and  Zydus to immediately pay up to approximately $15 million.

The Settlements also contain injunctive relief governing opioid marketing, sale, distribution, and/or distribution practices and require the Manufacturers to implement safeguards to prevent diversion of prescription opioids.

Each of the proposed settlements has two key participation steps.

First, each eligible state decides whether to participate in each Settlement. A list of participating states for each settlement can be found at https://nationalopioidsettlement.com/.

Second, eligible subdivisions within each participating state decide whether to participate in each Settlement. The more subdivisions that participate, the more funds flow to that state and its subdivisions. Any subdivision that does not participate cannot directly share in any of the settlement funds, even if the subdivision’s state is settling and other participating subdivisions are sharing in settlement funds. If the state does not participate in a particular Settlement, the subdivisions in that state are not eligible to participate in that Settlement.

Page 348 of 388 ends

WHO IS RUBRIS INC. AND WHAT IS THE IMPLEMENTATION ADMINISTRATOR? The Settlements provide that an Implementation Administrator will provide notice and manage the collection of participation forms. Rubris Inc. is the Implementation Administrator for these new Settlements and was also retained for the prior national opioid settlements.

WHY IS YOUR SUBDIVISION RECEIVING THIS NOTICE?
Your state has elected to participate in one or more of the Settlements, and your subdivision may participate in those Settlements in which your state has elected to participate. This notice is also sent directly to counsel for such subdivisions if the Implementation Administrator has their information.

If you are represented by an attorney with respect to opioid claims, please contact them.

Subdivisions can participate in the Settlements whether or not they filed a lawsuit or are represented.

WHERE CAN YOU FIND MORE INFORMATION?
Detailed information about the Settlements, including each settlement agreement, may be found at: https://nationalopioidsettlement.com. This website also includes information about how the Settlements are being implemented in most states and how funds will be allocated within your state.

You are encouraged to review the settlement agreement terms and discuss the terms and benefits with your counsel, your Attorney General’s Office, and other contacts within your state.

Information and documents regarding the Settlements and your state allocation can be found on the settlement website at https://nationalopioidsettlement.com/.

Your subdivision will need to decide whether to participate in the proposed Settlements, and subdivisions are encouraged to work through this process before the October 8, 2025 deadline.

HOW DO YOU PARTICIPATE IN THE SETTLEMENTS?
The Settlements require that you take affirmative steps to “opt in” to the Settlements.

In the next few weeks, you will receive documentation and instructions from the Implementation Administrator or, in some cases, your Attorney General’s Office. In order to participate in a settlement, a subdivision must sign and return the required Participation Form for that settlement.

Please add the following email addresses to your “safe” list so emails do not go to spam / junk folders: [email protected] and [email protected] . Please monitor your email for the Participation Forms and instructions.

All required documentation must be signed and returned on or before October 8, 2025.

Page 349 of 388 ends

City Council

STAFF REPORT
Date: August 6, 2025 Agenda Item:

5.A.

To: Honorable Mayor and City Council Members
From: Alma Robles, Community Development Director
Prepared By: Alma Robles, Community Development Director Department: Planning
SUBJECT:

Second Reading: Ordinance No. 1132 Approving Zone Change (pre-zone) 2023-01, to Pre-zone Approximately 56.82 Acres of Territory North of Bluff Street and West of River Road in the County of Riverside to be annexed to the City of Norco as Part of Annexation 27
RECOMMENDATION:

Second Reading: Ordinance No. 1132 approving Zone Change (pre-zone) 2023-01.

SUMMARY:

At its meeting on July 16, 2025, the City Council introduced Ordinance No. 1132 for the first reading. This ordinance proposes the pre-zoning of approximately 56.82 acres of land located north of Bluff Street and west of River Road in Riverside County, to be annexed to the City of Norco as part of Annexation 27. The ordinance passed the first reading with a 3-2 vote and is now presented to the City Council for a second reading and adoption, requiring a 4-5 vote for approval.

BACKGROUND:

This is a proposed annexation, initiated by the City, for approximately 56.82 acres located in the County of Riverside on the north side of Bluff Street, west of River Road.

All of the properties shown (in the map below) in heavy black outline, plus the adjacent public right-of-way, would be annexed to the City of Norco.

Page 350 of 388 ends

The proposed annexation would annex all of the remaining unincorporated territory between Norco and the City of Eastvale. Most of the properties are currently designated LDR (Low Density Residential) in the Riverside County General Plan and are zoned A-2 (Heavy Agriculture); two of the most northerly properties near the Santa Ana River are designated OS-C (Open Space-Conservation) in the Riverside County General Plan and are zoned W-1 (Watercourse, Watershed, and Conservation Areas). The properties currently designated LDR and zoned A-2 are fully developed with single family residences; the remaining two properties are undeveloped (ref. Exhibit 1 for the Existing General Plan and Zoning designations in the County of Riverside).

The Norco General Plan identifies the properties in the annexation area as within the City’s sphere of influence but does not identify land use designations for the properties.

NMC 18.03.10 states that “when annexed property is not pre-zoned, it shall be considered to be in the LD (LIMITED DEVELOPMENT) Zone at the time of annexation, until otherwise classified.”
The City of Norco is proposing to annex the Bluff Street properties to provide all City services to these properties within the City of Norco’s sphere of influence. Most of the homes in the proposed annexation area have septic wastewater systems. All of the homes were previously connected to a private community water supply (Block 77 Cooperative Water Company) that was no longer safe. The former water provider did not plan to acquire future water supplies or treat the existing water supply to make it safe to drink. Instead, Block 77 approached the City to request assistance with providing potable water service to the members/properties that were served by Block

77. The City agreed to allow these properties to obtain water service from the City. The City installed the new potable water services in late 2023 and to date, all of the developed properties in the proposed annexation area are connected to the City's water service (only six of homes are connected to the City's sewer service). Block 77 has indicated its intent to continue to use their well to provide non-potable water for watering landscaping for each property that so desires. There are no proposals to further develop any of the properties in the annexation area.

Page 351 of 388 ends

In addition to City water, the annexed properties would receive other public services upon annexation. The attached Plan of Services, required by Riverside County LAFCO for annexation applications, describes the existing public services received by the annexation area and the continuity of, or changes to, public services upon annexation (ref. Exhibit 2 - Plan of Services).

In order for the territory to be annexed to Norco the annexation has to be approved by LAFCO. The City would apply to LAFCO following the initiation of the annexation by the City Council. In addition, the City of Norco has to indicate in the application the prezoning of the territory. The pre-zoning is the zoning applicable once the annexation is complete. The annexation request is presented to the LAFCO Board for approval at a public hearing.

Unincorporated islands/annexation areas less than 150 acres are eligible for annexation under the streamlined provisions of the Government Code, which requires the LAFOC Commission to approve the annexation proposal and waive any protest provisions (otherwise available to property owners). A letter from LAFCO has been attached for reference.

ANALYSIS: Annexation: The annexation is being requested by the City because the annexation area is within the City’s sphere of influence and the City is already providing services to the properties in the annexation area. The annexation area can be served without further extension of City utilities. The annexation will support the City’s effort to provide potable water to the currently unincorporated properties. The proposed annexation is consistent with the General Plan Policies 2.8.1 and 2.8.2 in that the annexation supports the City’s small plot agricultural/animal-keeping lifestyle, and that adequate service and proper land use plans have been developed.

General Plan Amendment: The proposed action requires an amendment to the City’s General Plan to establish land use designations within the annexation area. State law requires zoning to be consistent with the General Plan land use designation. The existing lack of land use designation would not be consistent with any proposed zoning.

The proposed Norco General Plan land use designations are RA (Residential Agricultural) and WR (Water Related). These land use designations would be the same as the designations of nearby residential-agricultural and waterfront properties, are functionally equivalent to the existing Riverside County land use designations for each property, and are appropriate for the properties and neighborhood. Findings for approval of the proposed land use designations and the corresponding map are found in the attached General Plan Amendment resolution.

Zone Change (Pre-Zone): Without pre-zoning, upon annexation, the annexation area would be zoned LD (Limited Development), which is not appropriate for the properties developed with single-family residences. The proposed Norco zoning designations are A-1-20 (Agricultural - Low Density and OS (Open Space). These proposed zoning designations are appropriate for these properties as these zones will not result in additional development, are equivalent to the existing Riverside County zoning designations, and are identical to existing Norco zoning designations within the neighborhood. Norco Municipal Code 18.03.10 authorizes the City Council to pre-zone annexed areas by resolution. Findings for approval and the corresponding map of the proposed pre-zoning are found in the attached Zone Change resolution.

Page 352 of 388 ends

CEQA: The project has been determined to be categorically exempt from the California Environmental Quality Act and the City of Norco Environmental Guidelines pursuant to Class 19 (Annexations of Existing Facilities).

Planning Commission: The Planning Commission considered the subject annexation at their meeting on February 14, 2024. After hearing the testimony of the property owners affected by the annexation, who were all opposed to being annexed into the City, denied the resolution to support the subject annexation. The minutes excerpt on the annexation for that meeting on February 14, 2024 has been attached for reference.

FISCAL IMPACT:

Existing City services and infrastructure are adequate to service the proposed annexation area. To connect to the City water system, property owners were charged water development impact fees and water service construction fees. To connect to the City's wastewater system, the appropriate impact fees must also be paid. Properties that stay on septic will be required to pay a monthly treatment capacity fee. Following annexation, general taxes will continue to be levied on properties in the annexation area and the City of Norco would be added as a tax rate area.

RELATIONSHIP TO STRATEGIC PLAN:

This item is consistent with Strategic Plan Direction No. 3 - Economic Development and Financial Stability: Assure financial stability by expanding development efforts, diversifying revenue sources and continuing prudent financial management.

REVIEWED AND APPROVED BY:

Certified as to Availability of Funds: Joshua Calhoun, Finance Director Approved by: Lisette Free, City Manager
Approved as to Form: Harper and Burns, LLP, City Attorney ATTACHMENT(S):

Zone Change 2023-01, CC Ordinance No. 1132 For Annexation 27 Exhibit 1, County of Riverside - Existinng General Plan and Zoning Designation Maps Exhibit 2, Plan of Services FINAL with Maps for CC
Letter from Riverside Local Agency Formation Commission (LAFCO) - May 14, 2025 Planning Commission - Feb 14 2024 - Minutes Excerpt - 5.B.

Page 353 of 388 ends

ORDINANCE NO. 1132

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF NORCO,
CALIFORNIA APPROVING ZONE CHANGE 2023-01 TO PRE-ZONE
APPROXIMATELY 56.82 ACRES OF TERRITORY NORTH OF BLUFF

STREET AND WEST OF RIVER ROAD IN THE COUNTY OF RIVERSIDE

TO BE ANNEXED TO THE CITY OF NORCO AS PART OF ANNEXATION

27. WHEREAS, the City of Norco desires to initiate a proposal pursuant to the CorteseKnox-Hertzberg Local Government Reorganization Act of 2000, commencing with Section 56000 of the California Government Code, for the annexation of unincorporated territory located generally on the north side of Bluff Street, west of River Road, in the County of Riverside as referenced in attached Exhibit A.

WHEREAS, the City of Norco initiated a Zone Change 2023-01 as part of Annexation 27 and General Plan Amendment 2023-01, under the provisions of Title 18 of the Norco Municipal Code to establish zoning designations (pre–zone) as shown in Attachment C for the properties in the territory proposed to be annexed to the City; and WHEREAS, said application has been duly submitted to said City’s Planning Commission for decision at a public hearing for which proper notice was given; and WHEREAS, said application was scheduled for a public hearing with the Planning Commission on February 14, 2024, on or about 7 p.m. within the Council Chambers at 2820 Clark Avenue, Norco, California, 92860, and said Commission did hold a public hearing and received oral and written testimony pertaining to said application; and WHEREAS, at said meeting, the Planning Commission denied Resolution 2024- 06, thereby recommending that the City Council not initiate Annexation 27 and corresponding Zone Change 2023-01 to establish zoning designations (pre-zone) as shown on Attachment C for the properties in the territory proposed to be annexed to the City; and
WHEREAS, hearing of said Zone Change was duly noticed and scheduled for a public hearing by the City Council at their meeting of July 16, 2025 on or about 7 p.m. within the Council Chambers at 2820 Clark Avenue, Norco, California, 92860; and notice of public hearing on said action has been given in the manner and for times required by law; and
WHEREAS, at said time and place, said City Council heard and considered both oral and written evidence pertaining to Zone Change 2023-01 to establish zoning designations (pre-zone) as shown on Attachment C for the properties in the territory proposed to be annexed to the City of Norco; and

Page 354 of 388 ends

Ordinance No. 1132, ZC 2023-01 for Annexation 27

Page 2 ends

August 6, 2025
WHEREAS, the City of Norco, acting as the Lead Agency, has determined that the project is exempt from the California Environmental Quality Act (CEQA) and the City of Norco Environmental Guidelines per Class 19.

NOW, THEREFORE, the City Council of the City of Norco does hereby make the following FINDINGS AND DETERMINATIONS:

I. ENVIRONMENTAL FINDINGS:

This project is exempt from the California Environmental Quality Act (CEQA) and the City of Norco Environmental Guidelines per Class 19.

II. FINDINGS FOR ZONE CHANGE 2023-01 (PRE-ZONE):

A. The requested zone change is necessary and desirable for the development of the community in harmony with the objective of the General Plan in that the proposed A-1-20 and OS zones, equivalent to the existing Riverside County A-2 and W-1 zones, are compatible with the proposed RA (Residential Agricultural) and WR (Water Related) General Plan land use designations. The proposed A-1-20 zone is consistent with the existing residential development on the properties and with General Plan Policy 2.8.1 in that the zone supports the City’s small plot agricultural/animal-keeping lifestyle. The proposed OS zone is appropriate given that these properties adjacent to the Santa Ana River, subject to flooding, are not suitable for intense development.

B. The requested zone change will be compatible and complementary to existing conditions in the surrounding area in that the proposed A-1-20 zone is identical to that of adjacent properties, and the proposed OS zone is identical to that of other properties adjacent to the Santa Ana River.

C. The site is adequate in size to accommodate uses permitted in the zone requested, and that all applicable property development standards can be complied with in that properties to be zoned A-1-20 or OS generally meet the minimum property size requirements of the applicable zone.

D. The site properly relates to streets and highways designed and fully improved to carry the type and quantity of traffic that is expected to be generated in this area; and that utilities exist or are planned which will adequately serve the property as rezoned in that no improvements to streets, water mains, or sewer mains are needed to serve the territory to be annexed.

III. DETERMINATION:

NOW THEREFORE be it resolved, that the City Council of the City of Norco, California, does hereby approves as follows:

Page 355 of 388 ends

Ordinance No. 1132, ZC 2023-01 for Annexation 27

Page 3 ends

August 6, 2025
SECTION 1: Zone Change 2023-01 is hereby approved as shown on attached Exhibit C.

SECTION 2. EFFECTIVE DATE: This Ordinance shall become effective 30 days after final passage thereof.

SECTION 3. SEVERABILITY: If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the Ordinance, and each section, subsection, sentence, clause, sentences, clauses, or phrases here of irrespective of the fact that any one or more of the sections, subsections, sentences, clauses, or phrases hereof be declared invalid or unconstitutional.

SECTION 4. POSTING: The Mayor shall sign this Ordinance and the City clerk shall attest hereto and shall cause the same within 15 days of its passage to be posted at no less than five public places within the City of Norco.

PASSED AND ADOPTED by the City Council of the City of Norco at a regular meeting held on August 6, 2025.
_____________________________
Greg Newton, Mayor
City of Norco, California
ATTEST:
_________________________
Dana Roa, CMC
City Clerk
City of Norco, California

Page 356 of 388 ends

Ordinance No. 1132, ZC 2023-01 for Annexation 27

Page 4 ends

August 6, 2025
I, DANA ROA, CMC, City Clerk of the City of Norco, California, do hereby certify that the foregoing Ordinance was introduced at a regular meeting of the City Council of the City of Norco, California, duly held on July 16, 2025, and thereafter at a regular meeting of the City Council duly held August 6, 2025 it was duly passed and adopted by the following vote of the City Council:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS THEREOF, I have hereunto set my hand and affixed the official seal of the City of Norco, California, on August 6, 2025.
________________________
Dana Roa, CMC,
City Clerk
City of Norco, California

Page 357 of 388 ends

ATTACHMENT A
CITY OF NORCO ANNEXATION 27
(BLUFF STREET ANNEXATION)
Annexation Territory: All of the parcels identified in the following table, shown in heavy black outline on the following map, plus all adjacent public rights-of-way.

Address Assessor’s
Parcel Number
None 121050005
None 121050003
None 121050032
4628 Bluff St. 121050031
4638 Bluff St. 121050035
4656 Bluff St. 121050034
4898 Bluff St. 121050001
4988 Bluff St. 121320008
5010 Bluff St. 121320007
5036 Bluff St. 121320006
5066 Bluff St. 121320005
5092 Bluff St. 121320004
5122 Bluff St. 121320003
5142 Bluff St. 121320002
5182 Bluff St. 121320009
5206 Bluff Ct. 121030016
5236 Bluff St. 121030014
5266 Bluff St. 121030013
5296 Bluff St. 121030012
5336 Bluff St. 121030008
5386 Bluff St. 121030009
5416 Bluff St. 121030010
5434 Bluff St. 121030011
None 121030004

Page 358 of 388 ends

ATTACHMENT C
CITY OF NORCO ZONE CHANGE 2023-01 (PRE-ZONE)
To establish zoning designations for the following currently unincorporated properties:

Address Assessor’s
Parcel Number
Proposed Norco Zone
None 121050005 OS
None 121050003 OS
None 121050032 A-1-20
4628 Bluff St. 121050031 A-1-20
4638 Bluff St. 121050035 A-1-20
4656 Bluff St. 121050034 A-1-20
4898 Bluff St. 121050001 A-1-20
4988 Bluff St. 121320008 A-1-20
5010 Bluff St. 121320007 A-1-20
5036 Bluff St. 121320006 A-1-20
5066 Bluff St. 121320005 A-1-20
5092 Bluff St. 121320004 A-1-20
5122 Bluff St. 121320003 A-1-20
5142 Bluff St. 121320002 A-1-20
5182 Bluff St. 121320009 A-1-20
5206 Bluff Ct. 121030016 A-1-20
5236 Bluff St. 121030014 A-1-20
5266 Bluff St. 121030013 A-1-20
5296 Bluff St. 121030012 A-1-20
5336 Bluff St. 121030008 A-1-20
5386 Bluff St. 121030009 A-1-20
5416 Bluff St. 121030010 A-1-20
5434 Bluff St. 121030011 A-1-20
None 121030004 A-1-20
Attachment C (1 of 2)

Page 359 of 388 ends

CITY OF NORCO PROPOSED ZONING DESIGNATIONS
N
Legend

CITY OF NORCO ZONING
A-1-20 (Agricultural - Low Density)
OS (Open Space)
Attachment C (2 of 2)

Page 360 of 388 ends

COUNTY ZONING DESIGNATIONS
N
Legend

RIVERSIDE COUNTY ZONING DESIGNATION
A-2 (Heavy Agriculture Zone)
W-1 (Watercourse, Watershed
and Conservation)
Exhibit 1

Page 361 of 388 ends

COUNTY GENERAL PLAN LAND USE DESIGNATIONS
Conservation
N
Legend

RIVERSIDE COUNTY GENERAL PLAN LAND

USE DESIGNATION
Low-Density Residential
Conservation

Page 362 of 388 ends

EXHIBIT 2

BLUFF STREET ANNEXATION PLAN OF SERVICES

CITY OF NORCO
I. Background/Introduction
The City of Norco is proposing to annex the Bluff Street properties to provide City services to these properties within the City of Norco’s sphere of influence. The properties currently zoned A-2 (County of Riverside) are fully developed with single family residences. A majority of the homes have septic wastewater systems and are connected to the City of Norco domestic water system. Most of the properties are currently designated LDR (Low Density Residential) in the Riverside County General Plan and are zoned A-2 (Heavy Agriculture); two of the most northerly properties near the Santa Ana River are designated OS-C (Open Space-Conservation) in the Riverside County General Plan and are zoned W-1 (Watercourse, Watershed, and Conservation Areas). The City of Norco is predesignating the properties with equivalent General Plan land use designations: RA (Residential Agricultural) and WR (Water Related), and pre-zoning the properties with equivalent zoning designations: A-1-20 (Agricultural Low Density)--(with a minimum lot size of 21,780 square feet), and OS (Open Space). There are no proposals to develop any of the properties.

II. Police Protection
A. Current Service Provider
The Riverside County Sheriff currently provides police protection. The agency-wide officer to population ratio goal is .75 officers per 1,000 population. The response time goals for the area are 4 minutes for Priority 1 calls, 15 minutes for Priority 2 calls, 22 minutes for Priority 3 calls, and 45 minutes for Priority 4 calls.

The nearest County Sheriff substation providing counter services to the affected area is the Norco substation at 2870 Clark Avenue in Norco. The current officer to population ratio within the unincorporated area of the station is .57 officers per 1,000 population. The actual number of patrol hours per day within the unincorporated service area of the station is 48. Within the general area, the average response times are 4.93 minutes for Priority 1 calls, 16.38 minutes for Priority 2 calls, 32.13 minutes for Priority 3 calls, and 49.95 minutes for Priority 4 calls.

Five community-oriented policing and traffic deputies are also assigned to the community.

They work with and support the 19-member Norco Citizen's Patrol Program, conduct neighborhood watch programs, engage in community-oriented policing programs, and help prevent crime by targeting habitual offenders the ones who account for a large portion of the crime in the community. They also investigate traffic collisions, enforce traffic regulations and arrest drunk drivers.

B. New Service Provider
The City of Norco contracts with the County of Riverside for law enforcement services. To provide the contracted coverage requirements of 48 hours of patrol deputy time each day, 15 Jurupa Valley Station Deputies are assigned to patrol in the community. These deputies are supported by clerical staff, investigators for case follow-up, sergeants for supervision, and management and administrative staff from the Jurupa Valley Station.

Page 363 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 2 A lieutenant acts as the chief of police and is the liaison between the City and the Sheriff’s Department. Two sergeants are assigned to Norco to supervise deputies working out of the substation at City Hall.

Five community-oriented policing and traffic deputies are also assigned to the community.

They work with and support the 19-member Norco Citizen's Patrol Program, conduct neighborhood watch programs, engage in community-oriented policing programs, and help prevent crime by targeting habitual offenders the ones who account for a large portion- of the crime in the community. They also investigate traffic collisions, enforce traffic regulations and arrest drunk drivers.

Four community services officers assist in freeing up deputy time by handling prisoner transportation to the County jail and by responding to non-threatening calls for service.

The total contract officer to population ratio is .75 officers per 1,000 population. The response time goals are 4 minutes for Priority 1 calls, 15 minutes for Priority 2 calls, 22 minutes for Priority 3 calls, and 45 minutes for Priority 4 calls.

The actual officer to population ratio is .57 officers per 1,000 population. The actual number of patrol hours per day is 48. The average response times within the City of Norco are 4.93 minutes for Priority 1 calls, 16.38 minutes for Priority 2 calls, 32.13 minutes for Priority 3 calls, and 49.95 minutes for Priority 4 calls.

The properties proposed to be annexed are fully developed with single-family residences and are currently served by the Riverside County Sheriff’s Department. Police services for the proposed annexation would be serviced by the City through its contractual agreement with the County of Riverside Sheriff’s Department. With approximately 24 parcels, this area will not require additional personnel or facilities to maintain the existing level of service.

The nearest two stations providing counter services to the proposed annexation are the Norco substation at 2870 Clark Avenue in Norco and the Jurupa Valley station at 7477 Mission Boulevard in Jurupa Valley.

III. Fire Protection Services
A. Current Service Provider
The Cal Fire/Riverside County Fire Department provides fire protection to the proposed annexation area. The nearest primary response station is Station #57 at 3367 Corydon Avenue, Norco, CA 92860, 1.4 miles from the annexation area. The second nearest station is Station #31 at 14491 Chandler St, Eastvale, CA 92880, 2.6 miles from the annexation area. The third nearest station is Station #14 at 1511 Hamner Ave, Norco, CA 92860, 2.7 miles from the annexation area.

Target response times are 4 minutes. Actual response times are:

Station #57: 4 minutes 9 seconds
Station #31: 4 minutes 22 seconds
Station #14: 5 minutes 13 seconds

Page 364 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 3 Equipment/Staffing:

Station #57: Type I equipment (engine for structure fires with advanced life support functions), 3 people per shift
Station #31: Type I equipment (engine for structure fires with advanced life support functions), 3 people per shift
Station #14: Type III equipment (engine primarily for wildland fires with basic life support functions), 3 people per shift
Based on the existing Riverside County zoning and land use designations, and under the proposed Norco zoning and land use designations, the annexation area is fully developed to the extent allowed by right in the applicable zones. No additional personnel or equipment will be required in the foreseeable future.

Riverside County Fire Department has an automatic mutual aid agreement with the Corona Fire Department.

Following the annexation of the affected area, the fire protection service provider would remain the same. The City of Norco contracts with the Cal Fire/Riverside County Fire Departmentwhich are responsible for providing fire suppression, emergency medical, rescue, hazardous materials response, fire prevention, public fire safety education, and disaster preparedness services to the City.

Below is a map with the three nearest fire stations to the annexation area.

IV. Water Services

Page 365 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 4 A. Current Service Provider
Water services are currently being provided by the City of Norco; however, they were previously served by Block 77 Cooperative Water Company. The City does not have the existing water demands within the annexation area, but since the number of properties in question is small and defined as residential in nature, the overall water demands are not expected to exceed more than 20 acre-feet a year. There is no projected additional water demand within the annexation area under the current service provider. Demand from this area has not been accounted for in an UWMP or WSA but the City of Norco has sufficient water supply.

1. Water Supply
The current water supply is from both the City of Norco (Domestic) and from Block 77 groundwater well (irrigation). The groundwater well water is contaminated and unsafe to drink due to the contaminated groundwater. The current water provider does not plan to acquire future water supplies or treat the existing water supply to make it safe to drink. Instead, Block 77 has approached the City to request assistance with providing potable water service to the members/properties that are currently served by Block 77. The City has agreed to allow any property to obtain water service from the City and at least 16 members have already paid a water development impact fee and cost to construct a new water service to each respective property. The City completed the new potable water services in October 2023. Please note Block 77 has indicated its intent to continue to use their well to provide non-potable water for watering landscaping for each property that so desires.

2. Water Facilities
The existing Block 77 water facilities consist of one active well with pumps and pipes connecting to the properties within the annexation area. The well water has been determined by the State to be below water quality standards to serve the area and the well facility does not include needed water treatment. New water treatment facilities would be required to provide safe drinking water which Block 77 is not willing to construct and maintain. All future water use from the existing Block 77 well will be for non-potable purposes.

B. New Service Provider

1. Water Demand
The City of Norco will provide water service to the annexation area. Existing water demand within the City is about 6,700 acre-feet annually. Total projected total water demand within the City based on the existing zoning and land use designations is about 8,000 acre-feet annually. The additional water demand within the proposed annexation area is projected to be about 20 acre-feet annually. As the annexation area is within the City’s Sphere of Influence, the demand from Block 77 can be accommodated by the City of Norco.

Page 366 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 5 2. Water Supply
The City of Norco currently depends on three (3) wells and seven (7) outside agency connections for potable water supplies. The wells currently produce between 1,000 to 1,500 acre-feet annually and can safely yield 2,500 acre-feet at full operation. The City has nine (9) reservoirs with a combined storage capacity of fourteen (14) million gallons. The utilizes a water treatment facility that removes iron, manganese, and arsenic from its well water, insuring a safe and uninterrupted potable water supply of sufficient volume and pressure to meet domestic, irrigation, and fire flow requirements.

The City of Norco is in the process of developing a recycled water system to help offset/replace potable water demands at local parks. However, there is no immediate plan or infrastructure to support residential use on a localized or city-wide basis.

3. Water Facilities
An existing City water line runs the length of Bluff Street, adjacent to all of the properties to be annexed. The City completed a full water mainline replacement project on Bluff Street in October 2023 and at that time new water services were installed to each of the Block 77 properties that paid the applicable fees. No new wells, transmission lines, or storage will be needed to serve the annexation area. To connect to the City water system, the City charges each property a water development impact fee in the amount of $4,662 and a water service construction fee in the amount of $2,300 for a 1-inch service or $6,000 for a 2-inch service. See attached Norco Water System Map.

V. Wastewater Services
A. Wastewater Demand
Many of the properties in the annexation area are currently on septic but there are a few properties that have already connected to the City’s wastewater collection system. The City has already informed Block 77 members that they can connect to the City’s wastewater system if the appropriate impact fees in the amount of $6,134 is paid and a contractor is hired by the resident to install the new sewer service. The City will not require property owners in the annexation area to immediately connect to the City’s wastewater system. However, the City has an ordinance in place that does require properties within 200 feet of a public sewer to be connected to the City’s sanitary sewer system upon the transfer of property ownership.

B. Wastewater Facilities
The City is a member of the Western Riverside County Regional Wastewater Authority (WRCRWA) wastewater treatment plant that is fully operational. The plant can treat up to 2,700,000 gallons per day of Norco flow and is currently treating 1,900,000 gallons per day of Norco flow. An existing City sewer line runs the length of Bluff Street, adjacent to all of the properties in the annexation area. No new sewer facilities or expansion of existing facilities will be required to serve the annexation area. If properties are annexed, the City does require all properties on septic to pay a monthly treatment capacity fee in the amount of $19 which pays for the reserved treatment capacity of WRCRWA for Norco residents.

See attached Norco Sewer System Map.

Page 367 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 6 VI. Park and Recreation
A. Current Service Provider
The Riverside County Regional Park and Open-Space District (“RCRPD”), the current service provider, provides regional park services to all residents and employed persons within the County, including parks located in both incorporated and unincorporated areas.

RCRPD’s mandate is only to provide regional park facilities, so it does not support the construction, operations or maintenance of local parks anywhere within its jurisdiction.

The closest regional park is Rancho Jurupa Regional Park at 4800 Crestmore Road in Jurupa Valley, which is approximately 200 acres, is open 7 a.m. to sunset for day use and includes 131 RV campsites, cabin rentals, store, picnic shelters, restrooms, two fishing lakes, coin operated showers, laundry, barbecues, children’s playgrounds, boulder play area, grass areas, horseshoe pits, splash pad, miniature golfing, and disc golf. The closest open space area is the Hidden Valley Wildlife Area at 11401 Arlington Avenue in Riverside, which is approximately 1500 acres, is open 7 a.m. to 4:30 p.m. weekdays and to 7:00 p.m. weekends, and includes 25 miles of hiking and equestrian trails, access to the Santa Ana River Trail, a nature center, and nature trail.

B. New Service Provider
The City of Norco Community Services Department would be the new service provider.

The nearest City of Norco parks visited by the annexation area would be Sundance Park and Pacer Park. Sundance Park, at 4047 Sundance Lane, Norco, CA 92860, is 1.5 acres in size, is open 7 a.m. to dusk, and has a basketball court, grass area, picnic shelter (permit required), picnic tables, playground, and restroom. Pacer Park, at 3407 Morgan Drive, Norco, CA 92860, is 1.7 acres in size, is open 7 a.m. to dusk, and has an arena, grass area, picnic tables, and playground.

There are 594.63 acres of parkland in Norco, consisting of neighborhood pocket parks, community parks, a Multi-Sport Complex, River Trails Park in the Santa Ana River, the Ingalls Event Center, SilverLakes (private-public partnership) and an equestrian staging area. The Community Services Department is responsible for building an equitable and inclusive community now and into the future through its belief that Parks Make Life Better and the diverse offering of recreation activities and resources.

The Community Services Department consists of four major Divisions: Recreation, Youth and Family Services, Senior Services and Animal Services. The Department is critical to help form and support relationships and enrich resident’s quality of life that are the foundation of a strong, sustainable and vibrant community by providing a wide variety of recreational and cultural activities.

This Department is responsible for building an equitable and inclusive community now and into the future through its belief that Parks Make Life Better and the diverse offering of recreation activities and resources. Community Services is critical to help form and support relationships and enrich resident’s quality of life that are the foundation of a strong, sustainable, premier agricultural and animal-keeping community. By providing safe recreational programs and leisure opportunities, the Department fosters physical and social human development through programs and services tailored to a variety of age groups, interests and abilities.

Page 368 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 7 The Recreation Division is responsible for planning, organizing, implementing and evaluating comprehensive year-round recreation programs, services, leisure classes, and community events. As dedicated professionals, staff establishes a foundation and provides clear recreational opportunities where children, families, and adults can grow emotionally, intellectually, socially, and physically through leisure recreation in a safe and wholesome environment.

Embracing the diversity of the community, Youth and Family Services Division addresses intergenerational convergence and increases cultural unity. Among the recreational experiences offered that promote health and wellness and foster human development are Playschool, Mobile Recreation, youth basketball league and tee ball league, and adult basketball and pickleball leagues.

The Division creates partnerships with various local service organizations and agencies such as Norco Lions Club, Norco Kiwanis, and United Neighbors Involving Today’s Youth (UNITY) to promote constructive recreational opportunities for the youth. Continuous partnerships are a necessity to sustain programs and special events within the division.

The Youth Division works closely with Corona Norco Unified School District (CNUSD) to offer recreation experiences to children through the Summer Boost Program and the ELOP Program, where the Mobile Recreation vehicle is brought to a classroom and playground setting.

This Division strives to expand sports programs for youth and adults to enjoy building a sense of community, promoting healthy lifestyle opportunities, and fostering a competitive and cooperative spirit.

Senior Services Division provides social and recreational experiences as well as valuable resources to older adults. The senior center facilitates programs, activities, senior excursions and special events that enhance the physical, mental, emotional and social health of seniors, and supports seniors as they preserve their independent living. The senior center strengthens the safety and security of those it serves and strives to foster the development of older adults.

Special events, a congregate meal program, a door-to-door transportation program, senior excursion program, counseling and referral programs also assist in achieving these important goals in a safe and caring environment. Through intergenerational programming, activities facilitate community problem solving and give individuals an opportunity to make a positive impact on those they encounter. Additionally, as mature adults are more active longer in life, staff are committed to keeping up with the changing trends to provide quality programming to new generations.

Norco currently has 22.58 acres of parkland per 1,000 population, which is above NRPA standards. Park Services preserves, protects, and shares our city's special places and provides users with well-maintained and manicured facilities to recreate, enjoy and make lasting memories.

The National Recreation and Park Association’s (NRPA) 2017 NRPA Agency Performance Review report indicated the following metrics were the median number of residents per facility:
• Baseball fields: 1 per 6,453 population
• Softball fields: 1 per 8,500 population

Page 369 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 8 • Soccer fields: 1 per 6,200 population
• Rectangular Multi-use: 1 per 12,468 population
• Total land acreage: 9.6 acres per 1,000 population
The United States Census Bureau estimates that for the 2020 Census the City of Norco had a population of 25,042. The City of Norco exceeds these requirements with:
• Baseball fields: 6 Total – 4 needed per NRPA
• Softball fields: 3 Total - 3 needed per NRPA
• Soccer fields: 4 total – 4 needed per NRPA (Not including Silverlakes) • Rectangular Multi-use: 2 total - 2 needed per NRPA
• Total land acreage: 22.58 acres per 1,000 population- above NRPA standards The Parks Maintenance Division’s mission is to provide residents with parks, trails, and open spaces to enjoy passive and active recreation in a safe and secure environment.

The Parks Maintenance Division is responsible for 16 active and passive parks totaling more than 167 acres, 700 acres of open space, equestrian trails, and neighborhood park arenas. The Division is devoted to protecting, enhancing, and extending the life of the City’s active and open space assets.

The Division manages the landscape maintenance services contracts for the City’s Parks, and Facilities. These facilities are maintained weekly along with daily park inspections.

Along with landscape maintenance, the Division is responsible for park fencing, walkways, equestrian trails, neighborhood park arenas, playground equipment, tennis courts, and basketball courts.

The Division is a valuable partner and support team to the Community Services Department, Facilities Maintenance Division, and various sports leagues. The Division takes pride in maintaining high expectations and standards for clean, presentable facilities, and providing recreational experiences that serve the needs of the community.

In addition, the City of Norco is invested in a Collaboration/Partnership with the City of Corona for Homeless Programs and Services in the City of Norco. It provides a systemsoriented approach to address homelessness through outreach and engagement as well as provides emergency shelter beds and wrap-around supportive services.

The Community Services Department consists of one full-time Community Services Director, one full-time Supervisor and three full-time Coordinators that oversee approximately twenty part-time staff. Additionally, two full-time Administrative Clerks provide clerical support to Community Services.

VII. Electricity
The annexation would not result in a change in the electricity service provider. The annexation area will continue to receive service from the existing electricity service provider.

VIII. Library Services
A. Current Service Provider

Page 370 of 388 ends

Plan of Services for City of Norco Bluff Street Annexation (Annexation #27) 9 The Riverside County Library System provides services to the area to be annexed. The nearest library, the Norco Library, is open Monday through Thursday 10 a.m. through 8 p.m., Saturday 10 a.m. through 4 p.m., and is closed Friday and Sunday. The 10,430 square foot facility has approximately 18,000 volumes and two community meeting rooms.

Programs include storytime, movie night, crochet and knitting club, and cultural game day.

The library uses the Dewey Decimal System. Upon annexation, the Riverside County Library system would continue to be the library services provider.

IX. Solid Waste Collection
A. Current Service Provider
The County of Riverside currently provides solid waste collection services. The County has a contract with Waste Management, Inc. to provide those services. Waste Management provides residential service to the annexation area. Three carts are provided for weekly pick-up: solid waste, recyclables, and green waste. Customers have a choice of either 96-gallon or 64-gallon carts for each category. Service also includes 2 bulky pickups per year, 2 gallons of motor oil per year, and 3 e-waste items per year at no additional charge.

The monthly rate for service is $34.86. There are no senior or low-income discounts.

Manure service is also available for $38.93/month (96-gallon cart) or $139.13/month (2- cubic yard bin picked up once per week).

B. New Service Provider
Following annexation, the City of Norco will provide solid waste collection services. The City of Norco has a contract with Waste Management, Inc. to provide those services.

Waste Management will provide residential service to the annexation area. Three carts are provided for weekly pick-up on Monday: solid waste, recyclables, and green waste.

Customers have a choice of either 96-gallon or 64-gallon carts for each category. Service also includes free pick-up of up to 2 gallons of used motor oil and 3 free bulky pick-ups per year (up to 3 yards) which can include bulky, white goods, or e-waste, or up to ten 32- gallon trash bags. Manure service is also offered which includes either a 96-gallon cart or 2-cubic yard bin picked up on Monday or additional days per week for the 2-cubic yard bin.

The monthly rate for service is $34.86. The senior/low-income monthly rate for 96-gallon carts is $28.19 and for 64-gallon carts is $24.13. Manure service is $38.93/month (96- gallon cart) or $139.13/month (2-cubic yard bin picked up once per week). Upon annexation, the waste hauler will not change and services will remain substantially the same.

X. Street Maintenance
A. Current
The County of Riverside is currently responsible to maintain half street portion of the public right-of-way of Bluff Street adjacent to the annexation area. The City does not have any

Page 371 of 388 ends
← All documents from this meeting