Attachment 1
DE-SE0000418.0000
Energy Savings Performance Contracting Fuel Cell and Hydrogen Technologies Biofuels Geothermal
Building Energy Codes & Inspection Services Hydropower / Hydrokinetic Power Capital Investments & Financing Not Applicable
Biomass On­site Renewable Energy
Clean Energy / Clean Energy Technologies Pedestrian & Bike Infrastructure Commuting Infrastructure Reduce Commuting
Distributed Energy Resources Resiliency
Education and Outreach Retrofits
Electric Vehicles and Infrastructure Solar
Energy Affordability Workforce Development
Energy Management STEM Education
Energy Audits Storage
Energy Certification Programs Strategy Development
Energy Conservation Technical Assistance
Energy Efficiency Traffic Signals & Street Lighting
Energy Equity Waste to Energy / Solid Waste Minimization Assessments & Feasibility Studies Weatherization
ENERGY STAR Wind
Energy Workforce Training

5. Estimated annual energy savings:    MBtus 27,000,000

6. Description (executive summary of goals and objectives)* l To develop an Energy Assessment plan for  Municipal Facilities throughout the City of Oakland. Staff will research which buildings and structures that will need to be included in this study. Staff and consultants will analyze, research, and complete this Municipal Facility Energy Assessment plan. This  plan will include various energy output calculations and energy efficiency and resilience recommendations for each facility.
l The estimated timeline will be using the measure of time as months.

7. Activity milestones
Milestone Description  Planned
Amount
Bidding for Consultants begin ­ March 2024  3
Consultant Selected  ­ July 2024  2
Contract Executed and Work begins  ­ August 2024  3
Energy Assessment Project concludes  ­ March 2026  16

8. Activity performance metrics
a. Specific metric activity (required)**

8. Energy Audits

9. Activity funds by source
a. EECBGBIL grant (all funds in the approved budget)
Fund Source   Planned Amount
Federal
Fund Source Type:  Federal  $405,710.00
U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

ACTIVITY FILE
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:10 PM

Page 2 ends

Attachment 1
DE-SE0000418.0000
b. Leveraged funds anticipated (outside approved budget) Total   $405,710.00
Fund Source   Planned Amount
No records found
Total   $0.00
*Please use additional pages if more space is needed.
**Mandatory requirement
U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

ACTIVITY FILE
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:10 PM

Page 3 ends

Attachment 1
DE-SE0000418.0000
Template Version 04/01/23
Federal Assistance Reporting Checklist
Attachment 2

1. Award Number:

DE-SE0000418.0000

2. Program/Project Title:

EECBG

3. Recipient:

City of Oakland

4. Reporting Requirements (see also the Special Instructions) Frequency Addresses I. PROJECT MANAGEMENT REPORTING
A. Performance Report

1. Status and Milestones

2. Quantitative

3. Narrative
S A. https://www.page.energy.gov
B. Financial Report (SF-425) S B. https://www.page.energy.gov C. Other (see Special Instructions) A5 C. See Special Instructions II. AWARD MANAGEMENT REPORTING
A. Tangible Personal Property Report - Annual Property Report (SF- 428 & SF-428A)
A5 A. Send Email to DOE Project Officer
B. Tangible Personal Property Report – Disposition Request/Report (SF-428 & SF-428C)
Y B. https://www.page.energy.gov
C. Uniform Commercial Code (UCC) Financing Statements A5 C. https://www.page.energy.gov D. Federal Subaward Reporting System (FSRS) A5 D. See section II. D. for instructions and due dates E. Annual Incurred Cost Proposal A5 E. FSRS
F. Single Audit: States, Locals, Tribal Governments, and Non-Profits Y180 F. See section II. F. for instructions and due dates G. Other (see Special Instructions)

1. Annual Historic Preservation Report
H. Davis Bacon

1. Semi-Annual Davis Bacon

2. Weekly Payroll report
O
Y
S
W
G. See section II. G. for instructions and due dates
G1. Email to project officer &
[email protected]
G2. Submit via https://www.page.energy.gov
H1. https://www.page.energy.gov
H2. https://www.page.energy.gov
III. CLOSEOUT REPORTING
A. Tangible Personal Property Report – Final Report (SF-428 & SF- 428B)
F A. https://www.page.energy.gov
B. Other (see Special Instructions) F B. See Special Instructions Attachment 2
DE-SE0000418.0000
2 Federal Assistance Reporting Checklist

4. Reporting Requirements (see also the Special Instructions) Frequency Addresses IV. Bipartisan Infrastructure Law Reporting
A. Quality Job Creation

1. Direct Jobs

2. Good Jobs
B. Equity and Justice

1. Community Engagement Process

2. Engagement Events and Technical Assistance
C. Pathway to Net-Zero

1. Infrastructure Supported

2. Energy Saved
D. One-Time Location Report
A5
Y
Y
1 A.1.See Section V.D.I for instructions and due dates
A.2. https://www.page.energy.gov
B. https://www.page.energy.gov
C. https://www.page.energy.gov
D. https://www.page.energy.gov
FREQUENCY CODES AND DUE DATES:

A5 – As Specified or within five (5) calendar days after the event.

F – Final; within 120 calendar days after expiration or termination of the award.

O – Other: See instructions for further details.

P – Post-project (after the period of performance); within five (5) calendar days after the event, or as specified.

Q – Quarterly; within 30 calendar days after the end of the federal fiscal year quarter.

S – Semiannually; within 30 days after end of the reporting period.

Y – Yearly; within 90 calendar days after the end of the federal fiscal year.

Y180 – Yearly; within 180 calendar days after the close of the recipient’s fiscal year.

W – Weekly; within 7 days of the payroll
1 – One time report
FULL URLS:

OSTI E-Link: http://www.osti.gov/elink-2413
OSTI E-Link Datasets: https://www.osti.gov/elink/2416-submission.jsp DOE CODE: https://www.osti.gov/doecode/
iEdison: http://www.iedison.gov
EERE PMC: https://www.eere-pmc.energy.gov/SubmitReports.aspx FSRS: https://www.fsrs.gov
PAGE: https://www.page.energy.gov
Special Instructions:

Attachment 2
DE-SE0000418.0000
3 Federal Assistance Reporting Checklist
Contents
I. Project Management Reporting ......................................................................................... 5 A. Performance Report ........................................................................................................... 5

1. Organizations .................................................................................................................. 5

2. Tasks and Milestones ...................................................................................................... 5

3. Outlays ............................................................................................................................ 5

4. Metrics ............................................................................................................................ 6

5. Products .......................................................................................................................... 6

6. Participants ..................................................................................................................... 7

7. Special Reporting Requirements .................................................................................... 8

8. Qualitative reporting requirements................................................................................ 8 B. Financial Report SF-425 Federal Financial Report .............................................................. 8 C. Other (see Special Instructions) .......................................................................................... 8 II. Award Management Reporting .......................................................................................... 9 A. Tangible Personal Property Report – Annual Property Report (SF-428 & SF-428A) .......... 9 B. Tangible Personal Property Report – Disposition Request/Report (SF-428 & SF-428C) .... 9 C. Uniform Commercial Code (UCC) Financing Statements ................................................... 9 D. Federal Subaward Reporting System (FSRS) ..................................................................... 10 E. Annual Incurred Cost Proposals ........................................................................................ 11 F. Single Audit: States, Local Government, Tribal Governments, Institution of Higher Education (IHE), or Non-Profit Organization .................................................................... 11 G. National Environmental Policy Act (NEPA) Reporting ...................................................... 12 H. Davis Bacon Reporting ...................................................................................................... 12 III. Closeout Reporting ........................................................................................................... 14 A. Tangible Personal Property Report – Final Report (SF-428 & SF-428B) ........................... 14 B. Other (see Special Instructions) ........................................................................................ 14 IV. BIL Reporting ..................................................................................................................... 15 A. Quality Job Creation .......................................................................................................... 15

1. Direct Jobs ..................................................................................................................... 15

2. Good Jobs ...................................................................................................................... 15 B. Equity and Justice ............................................................................................................. 15

1. Community Engagement Process ................................................................................. 16

2. Engagement Events and Technical Assistance ............................................................. 16 4 Federal Assistance Reporting Checklist
C. Pathways to Net Zero........................................................................................................ 16

1. Infrastructure Supported .............................................................................................. 16

2. Energy Saved ................................................................................................................. 16 D. One Time Location Report ................................................................................................ 16 V. Appendix A: Notice To Recipients (Prime Recipients And Subrecipients) Regarding Protected Data, Limited Rights Data And Protected Personally Identifiable Information ........... 18 5 Federal Assistance Reporting Checklist
***
Reporting Instructions
Throughout the performance of the project, it is important that you mark Protected Data/Limited Rights Data as described in Appendix A. It is equally important that you not submit Protected Personally Identifiable Information (Protected PII) to DOE. See Appendix A for guidance on Protected PII. ***
I. Project Management Reporting
A. Performance Report
Submit to: https://www.page.energy.gov
Submission
deadline:

Within 30 calendar days after the end of the semi-annual reporting period (April 30 and October 30)
Semi-annual, the prime recipient is required to submit a Performance Report for the project. This report summarizes the entirety of work performed by the prime recipient, subrecipients, and contractors. The Performance Report contains qualitative information on the project progress, and captures quantitative information on the project progress. The PR must include the following information. Your DOE project team will provide a form for submission.

1. Organizations
Identify all subrecipients, contractors, U.S. National Laboratories, partners, and collaborating organizations. Recipients must also include all foreign collaborators as outlined in the Foreign Collaboration Considerations term of the award Terms and Conditions. For each, provide name, UEI, zip code or latitude/longitude, role in the project, contribution to the project, and start and end date. This is information can be included in the qualitative section of the report.

2. Tasks and Milestones
Enter all tasks and milestones identified in your activity file. Each reporting period, update the status of the task/milestone. More milestones can be added as relevant to your project.

3. Outlays
Using your approved budget, enter all of the expenditures incurred each reporting period. Also include recipient cost share.

6 Federal Assistance Reporting Checklist

4. Metrics
Report on your primary process metric selected in the application and any additional metrics that are applicable to your project. Please refer to the EECBG Program Process Metrics, EECBG-BIL-Reporting-Guidance.pdf (energy.gov), and the Eligible Activity Areas and their Recommended Process Metrics (energy.gov) per your activity.

5. Products

Can be uploaded as an attachment to the PAGE performance report.

What has the project produced?

In the qualitative section of this report, list any products resulting from the project during the reporting period. Examples of products include: publications, conference papers, and presentations; website(s); technologies or techniques; ; and other products, such as data or databases, physical collections, audio or video products, software or NetWare, models, educational aids or curricula, instruments or equipment, research material, interventions (e.g., clinical or educational), new business creation or any other public release of information related to the project.

a. Publications, conference papers, and presentations
Report the publication(s) resulting from the work under this award.

Please note: Recipients must use the DOE acknowledgement and legal disclaimer language as described in the Special Terms and Conditions.

The recipient is reminded that all data produced under the award should comply with the award’s data management plan (DMP). The DMP provides a plan for making all research data displayed in publications resulting from
the proposed work digitally accessible at
the time of publication. At a minimum, the DMP (1) describes how data sharing and preservation will enable validation of the results from the proposed work, how the results could be validated if data are not shared or preserved and (2) has a plan for making all research data displayed in publications resulting from the proposed work digitally accessible at the time of publications.

i. Publications, conference papers and presentations
Identify any other publications, conference papers and/or presentations not reported above. Specify the status of the publication as noted above.

7 Federal Assistance Reporting Checklist
b. Website(s)
List the URL for any Internet site(s) that disseminates the results of the research activities. A short description of each site should be provided.

It is not necessary to include the publications already specified above in this section.

c. Other products
Identify any other significant products that were developed under this project. Describe the product and how it is being shared. Examples of other products are: Data or databases; Physical collections; Audio or video products; Software or NetWare; Models; Educational aids or curricula; Instruments or equipment; Research material (e.g., germplasm, cell lines, DNA probes, animal models); Interventions (e.g. clinical, educational); new business creation; and Other.

6. Participants
The following information on participants (individuals) was provided during award negotiations. This can be updated in the awards contacts section in https://www.page.energy.gov. On a (quarterly/semi-annual/annual) basis, provide updates as needed. For most projects, recipients must identify and provide specific information for the following individuals at the prime and subrecipient level: (1) all senior and key personnel (including project director(s)/principal investigator(s)); and (2) each person who has worked or is expected to work at least 160 hours on the project at least one person month per year on the project regardless of the source of compensation (a person month equals approximately 160 hours of effort). In limited circumstances, typically large-scale construction projects, recipients are only required to report on (1) senior and key personnel for the prime recipient and subrecipients. Please refer to the Participants and Other Collaborating Organizations Term in your award Terms and Conditions to determine what level of reporting is required for your specific award.

a. What individuals have worked on the project?
Provide the following information for individuals at the prime recipient and subrecipient level: (1) all senior and key personnel; and (2) each person who has worked or is expected to work at least one person month per year on the project regardless of the source of compensation (a person month equals approximately 160 hours of effort). This information can be added as an attachment in the https://www.page.energy.gov document library.
i. Name
ii. Organization
iii. Job Title
iv. Role in the project

8 Federal Assistance Reporting Checklist
v. Start and end date (month and year) working on the project vi. State, U.S. territory, and/or country of residence
vii. Whether this person collaborated with an individual or entity located in a foreign country in connection with the scope of this Award, and
viii. If yes to a.vii, whether the person traveled to the foreign country as part of that collaboration, and, if so, where and what the duration of stay was.

7. Special Reporting Requirements
Respond to any special reporting requirements specified in the award terms and conditions, as well as any award specific reporting requirements.

8. Qualitative reporting requirements
In this section, provide any additional description about the project. Can be used to elaborate on information requested above and can include on impact, changes or issues, achievements, or more.

B. Financial Report SF-425 Federal Financial Report

Submit to: https://www.page.energy.gov
Submission
deadline:

Within 30 calendar days after the end of the semi-annual reporting period (April 30 and October 30) and within 120 calendar days after expiration or termination of the award

Semi-annually the prime recipient is required to submit a completed SF-425 for the project to DOE, covering the entirety of work performed by the prime recipient, subrecipients, and contractors – to DOE.

C. Other (see Special Instructions)

Submit to: https://www.page.energy.gov
Submission
deadline:

Within five (5) calendar days after the event, or as specified

9 Federal Assistance Reporting Checklist
II. Award Management Reporting

A. Tangible Personal Property Report – Annual Property Report (SF-428 & SF-428A)

Submit to: Send Email to DOE Project Officer
Submission
deadline:

Within 90 calendar days after the end of the annual reporting period when applicable

The prime recipient must submit an annual inventory of federally-owned property (government-furnished) where the award specifies that title to the property vests with the federal government, whether it is in the possession of the prime recipient or subrecipient(s). The prime recipient must complete an SF-428 and SF-428A, available at Post-Award Reporting Forms | GRANTS.GOV.

B. Tangible Personal Property Report – Disposition Request/Report (SF-428 & SF- 428C)

Submit to: https://www.page.energy.gov
Submission
deadline:

Within 5 calendar days of the event or as specified when applicable

The prime recipient must request disposition instructions for or report disposition of federally-owned property or equipment acquired with project funds, whether the property or equipment is/was in the possession of the prime recipient or subrecipient(s). Recipients may also be required to provide compensation to the awarding agency when acquired equipment is sold or retained for use on activities not sponsored by the federal government. Any equipment with an acquisition cost above $5,000 must be included in the inventory.

If disposition occurs at any time other than award closeout (i.e., at any time throughout the life of the project or after project completion and closeout as long as the federal government retains an interest in the item), the prime recipient must complete an SF-428 and SF-428C, available at Post-Award Reporting Forms | GRANTS.GOV

If disposition instructions are requested at the time of award closeout, the prime recipient must submit the SF-428 and SF-428B (see III. Closeout Reporting).

Only the DOE Contracting Officer has authority to approve disposition requests and issue disposition instructions.

C. Uniform Commercial Code (UCC) Financing Statements

Submit to: Send Email to DOE Project Officer

10 Federal Assistance Reporting Checklist
Submission
deadline:

Within five (5) calendar days after the event, or as specified.

If a for-profit recipient or subrecipient desires to purchase a piece of equipment for their project, and the per-unit dollar value of said equipment is $5,000 or more, and the federal share of the financial assistance agreement is more than $1M, the recipient or subrecipient must file a UCC financing statement.

A UCC financing statement provides public notice that the federal government has an undivided reversionary interest in the equipment, and as such the equipment cannot be sold or used as collateral for a loan (encumbered).

The for-profit recipient or subrecipient must file the UCC financing statement(s) with the Secretary of State where the equipment will be physically located and must pay any associated costs for such filings.

The initial UCC financing statement may also be referred to as a UCC1. For additional pieces of equipment not specified in the award budget, TBD equipment, or equipment needed in future budget periods, the recipient can file an amendment to the original UCC1 financing statement, by submitting the UCC3 financing statement amendment.

Each UCC financing statement or amendment is to be filed with the appropriate Secretary of State office, where the equipment will be physically located.

Note: All costs associated with filing UCC financing statements, UCC financing statement amendments, and UCC financing statement terminations, are allowable and allocable costs which can be charged to the federal award.

At a minimum, the recipient must have stated in their UCC financing statement in block 4. (collateral) the following:

o “Title to all equipment (not real property) purchased with federal funds under this financial assistance agreement is conditional pursuant to the terms of 2 CFR 910.360, and the federal government retains an undivided reversionary interest in the equipment at the federal cost-share proportion specified in the award terms and conditions.” o Federal Award Identification Number (e.g., DE-EE000XXXX)

D. Federal Subaward Reporting System (FSRS)

Submit to: https://www.fsrs.gov/
Submission
deadline:

The prime recipient is required to file a FFATA sub-award report by the end of the month following the month in which the prime recipient awards any sub- grant greater than or equal to $30,000.

11 Federal Assistance Reporting Checklist
The Federal Subaward Reporting System (FSRS) is the reporting tool prime recipients use to capture and report subaward and executive compensation data regarding their first-tier subrecipients to meet the FFATA reporting requirements. Prime recipients will report against subrecipients’ awards. The subrecipient information entered in FSRS will then be displayed on USASpending.gov associated with the prime recipient’s award furthering federal spending transparency.

The prime recipient is required to file a FFATA sub-award report by the end of the month following the month in which the prime recipient awards any sub-award greater than or equal to $30,000.

E. Annual Incurred Cost Proposals

Submit to: If DOE is the Cognizant Federal Agency, send the Annual Incurred Cost Proposal to one of the following offices:
[email protected] (if the Golden Field Office is Cognizant); OR
[email protected] (if OCED is Cognizant)

[email protected] (if NETL is Cognizant)

Otherwise, submit the proposal to the Recipient’s appropriate Cognizant Federal Agency office.

Submission
deadline:

Within 180 calendar days after the close of the recipient’s fiscal year* *The end of the period of the performance, or closure of an award, does not dismiss this reporting requirement.

Prime recipients must submit a certified annual Incurred Cost Proposal (ICP), reconciled to its financial records, in order to finalize and reconcile billing rates incurred and billed to the Government.

An ICP submission is required unless one of the following conditions apply to the DOE award:
 Recipient elected to apply the 10% de minimis rate as allowed under 2 CFR 200.414(f); or  Recipient has a pre-determined Negotiated Indirect Cost Rate Agreement (NICRA).

F. Single Audit: States, Local Government, Tribal Governments, Institution of Higher Education (IHE), or Non-Profit Organization

Submit to: Federal Audit Clearinghouse -
https://harvester.census.gov/facweb/Default.aspx
Submission
deadline:

Within the earlier of 30 days after receipt of the auditor’s report(s) or 9 months after the end of the audit period (recipient’s fiscal year-end)* *The end of the period of the performance, or closure of an award, does not dismiss this reporting requirement.

12 Federal Assistance Reporting Checklist

As required by 2 CFR 200 Subpart F, non-federal entities that expend $750,000 or more during the non-federal entity's fiscal year in federal awards must have a single or program- specific audit conducted. The single audit must be conducted in accordance with §200.514 Scope of audit, except when it elects to have a program-specific audit conducted.

For most single audits, the requirement is for annual single audits. However, there are occasions where a single audit is not required annually. Per 2 CFR 200.504 - Frequency of audits, a state, local government, or Indian tribe that is required by constitution or statute to undergo its audits less frequently than annually, is permitted to undergo its audits biennially. Also, any nonprofit organization that had biennial audits for all biennial periods ending between July 1, 1992, and January 1, 1995, is permitted to undergo its single audits biennially.

For a program-specific audit, when a recipient expends federal award funds under only one federal program (excluding R&D) and the federal program's statutes, regulations, or the terms and conditions of the federal award do not require a financial statement audit of the auditee, the auditee may elect to have a program-specific audit conducted. A program- specific audit may not be elected for R&D unless all of the federal awards expended were received from the same federal agency, or the same federal agency and the same pass- through entity, and that federal agency, or pass-through entity in the case of a subrecipient, approves in advance a program-specific audit.

The single audit report shall include audited financial statements.

G. National Environmental Policy Act (NEPA) Reporting

Submit to:

Historic Preservation report: https://www.page.energy.gov Submission
deadline:

Historic Preservation reports: September 15 of each year

Activities utilizing the Historic Preservation Programmatic Agreements must indicate this on the annually required Historic Preservation report. Reports are due September 15 of each year. Forms can be found on and submitted through the DOE PAGE platform found at www.page.energy.gov/. The Historic Preservation report must be submitted for all activities including activities conducted by the sub-recipient. A full list of Programmatic Agreements can be found at Historic Preservation – Executed Programmatic Agreements | Department of Energy

H. Davis Bacon Reporting

Submit to: https://www.page.energy.gov

13 Federal Assistance Reporting Checklist
Submission
deadline:

Within 7 days of each pay period and Semi-annually when applicable

a. The DBA applies to contractors and subcontractors of the recipient or sub- recipients for contracts more than $2,000 for the construction, alteration, and/or repair of public buildings or public works, including painting and decorating, where the United States or the District of Columbia is a direct party to the contract. Contractors and subcontractors funded in whole or in part under this Award shall pay their laborers and mechanics wages at rates not less than those prevailing on similar projects in the locality, as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code commonly referred to as the Davis-Bacon Act (DBA). b. EECBG Program formula grant recipients will also be required to undergo DBA compliance training and maintain competency in DBA compliance. The Contracting Officer will notify the recipient of any DOEsponsored DBA compliance trainings. DOL offers free Prevailing Wage Seminars several times a year that meet this requirement, at:
https://www.dol.gov/agencies/whd/governmentcontracts/construction/seminar s/events
c. Weekly Payroll Report
i. EECBG prime recipients (grantees) must maintain an accurate record of hours worked and wages paid, including fringe benefit contributions, and submit certified payrolls on a weekly basis to DOE. Grantees are also responsible for tracking and maintain DBA records for all subcontractors and sub-recipients. Examples of labor compliance platforms available to help grantees streamline DBA reporting by contractors and subcontractors include: LCPtracker, eMARS, Elation Systems, and other third-party systems
ii. EECBG Program recipients must ensure the timely electronic submission of weekly certified payrolls through the DOE-provided DBA software application as part of its compliance with the Davis-Bacon Act unless a waiver is granted to a particular contractor or subcontractor because it is unable or limited in its ability to use or access. Applicants should indicate if they will seek a waiver.
d. Semi-Annual Compliance and Enforcement Report
i. EECBG grantees must submit semi-annual reports on compliance with the enforcement of the labor standards provision of the Davis-Bacon Act and its related acts covering the periods of October 1 through March 31 and April 1 through September 30
ii. Examples of labor compliance platforms available to help grantees streamline DBA reporting by contractors and subcontractors include:

LCPtracker, eMARS, Elation Systems, and other third-party systems For more information about labor laws to include Davis Bacon Act and Build American Buy American contact [email protected].

14 Federal Assistance Reporting Checklist
III. Closeout Reporting

A. Tangible Personal Property Report – Final Report (SF-428 & SF-428B)

Submit to: https://www.page.energy.gov
Submission
deadline:

Within 120 calendar days after expiration or termination of the award

The prime recipient must submit a final inventory of and request disposition instructions for any federally-owned property and/or property or equipment acquired with project funds with an acquisition cost above $5,000, whether the property is/was in the possession of the prime recipient or subrecipients.

The prime recipient must complete an SF-428 and SF-428B, available at Post-Award Reporting Forms | GRANTS.GOV.

If disposition occurs at any time other than award closeout, the prime recipient must complete an SF-428 and SF-428C (see IV. Other Reporting H. Property Disposition Request/Report).

Only the DOE Contracting Officer has authority to approve disposition requests and issue disposition instructions.

B. Other (see Special Instructions)

Submit to: https://www.page.energy.gov
Submission
deadline:

Within 120 calendar days after expiration or termination of the award

15 Federal Assistance Reporting Checklist
IV. BIL Reporting

A. Quality Job Creation

1. Direct Jobs
Submit to: Consult DOE Project team for the announcement of the Davis Bacon Reporting Tool

Submission
deadline:

Weekly

This award is funded under Division D of the Bipartisan Infrastructure Law (BIL). All laborers and mechanics employed by the recipient, subrecipients, contractors or subcontractors in the performance of construction, alteration, or repair work in excess of $2000 on an award funded directly by or assisted in whole or in part by funds made available under this award shall be paid wages at rates not less than those prevailing on similar projects in the locality, as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code commonly referred to as the “Davis-Bacon Act” (DBA).

The Recipient must ensure the timely electronic submission of weekly certified payrolls to a third-party DBA electronic payroll compliance software application unless a waiver is granted to a particular contractor or subcontractor because they are unable or limited in their ability to use or access the software. Please refer to section II.H. for information on Davis Bacon Act Reporting.

2. Good Jobs
Submit to: https://www.page.energy.gov
Submission
deadline:

Yearly; within 30 calendar days after the end of the federal fiscal year

Recipients must complete and upload the jobs template (coming soon) that will be available for download from the PAGE site or the EECBG formula application hub on an annual basis. Once available, the report will be uploaded to the PAGE document library. The report focuses on good jobs provided to employees through EECBG Program funds.

B. Equity and Justice

Submit to: https://www.page.energy.gov
Submission
deadline:

Semi-annually within 30 calendar days after the end of the federal fiscal year quarter

The Equity and Justice reports are imbedded in the EECBG Program Process Metrics as part of the performance report. Please report on EECBG process metrics 9d. (Organizations Receiving TA) and 11a. (Community and Stakeholder Engagement) when applicable to #1 and #2 below.

16 Federal Assistance Reporting Checklist

1. Community Engagement Process
This report applies to all projects that include building, expanding, or retrofitting a facility. Recipients should report on engagement activities such as participatory research, citizen advisory committees, open planning forums, etc. and the outputs of those activities such as memorandums of understanding, letters of support, etc. Information in this tab should reflect the objectives.

2. Engagement Events and Technical Assistance
This report applies to all projects that hold stakeholder engagement events.

Recipients are required to report on stakeholders engaged and from what, if any, communities of interest.

C. Pathways to Net Zero

Submit to: https://www.page.energy.gov
Submission
deadline:

As Specified, within 30 calendar days after the end of the first quarterly reporting period; Yearly; within 90 calendar days after the end of the federal fiscal year and Final; within 120 calendar days after expiration or termination of the award.

Pathways to Net Zero Reports will be imbedded in the EECBG Program Process Metrics as part of the performance reports. Please report on EECBG process metric areas 1 (Retrofits), 3 (Equipment Purchased), and 5 (Renewable Energy) when applicable.

1. Infrastructure Supported
This report applies to projects that build, retrofit, retool, repurpose, or otherwise support the construction or continued operation of energy generation, energy storage, or other clean energy infrastructure. Projects that fund infrastructure planning should also report.

Recipients are required to report on planned values, annual actual values for the life of project, and values at closeout. This report is structured by technology type, recipients need only complete the technology type applicable to their project as indicated by the DOE project team.

2. Energy Saved
This report applies to all projects that include energy efficiency upgrades or fuel switching, water conservation upgrades that save energy, or distributed energy resources. Recipients are required to report on interventions completed as well as planned and actual energy savings.

D. One Time Location Report

17 Federal Assistance Reporting Checklist
Submit to: https://www.page.energy.gov
Submission
deadline:

One time

In addition to the reporting of metrics, there is a one-time special status report requirement for recipients with projects that take place in specific physical locations.

The eligible activities that would be most applicable to the One-time Location Report are noted in Attachment 2. This report is required for all EECBG Program formula recipients pursuing activities mapped to this report, including projects benefitting disadvantaged communities. This report would be best completed during the first year of the award.

18 Federal Assistance Reporting Checklist
V. Appendix A: Notice To Recipients (Prime Recipients And Subrecipients) Regarding Protected Data, Limited Rights Data And Protected Personally Identifiable Information

I. PROTECTED DATA AND LIMITED RIGHTS DATA

The recipient is required to mark protected data and limited rights data in accordance with the IP clause set of the award agreement. Failure to properly mark data may result in its public disclosure under the Freedom of Information Act (FOIA, 5 U.S.C. § 552) or otherwise.

A. Protected Data - Technical Data or Commercial or Financial Data First Produced in the Performance of the Award

The U.S. Government normally retains unlimited rights in any technical data or commercial or financial data produced in performance of Government financial assistance awards, including the right to distribute to the public.

However, under certain DOE awards, the recipient may mark certain categories of data produced under the award as protected from public disclosure for a period of time (“Protected Data”).If the award agreement provides for protected data and the recipient wants the data to be protected, the recipient must properly mark any documents containing Protected Data.

The recipient should review the IP clause set of the award agreement to determine the applicability of protected data, the maximum length of period of time for data protection and the required markings that must be used to invoke data protection for the award.

B. Limited Rights Data - Data Produced Outside of the Award at Private Expense Limited Rights Data is data (other than computer software) developed at private expense outside any Government financial assistance award or contract that embody trade secrets or are commercial or financial and confidential or privileged. Prior to including any Limited Rights Data in any documents to DOE, the recipient should review the award agreement. In most DOE awards, the recipient should not deliver any limited rights data to DOE if the recipient wants to protect the Limited Rights Data. If the DOE award does allow and require the delivery of limited rights data, then the recipient must properly mark any documents containing Limited Rights Data as set forth in the IP clause of the award agreement.

II. PROTECTED PERSONALLY IDENTIFIABLE INFORMATION

The recipient should not include any Protected Personally Identifiable Information (Protected PII) in their submissions to DOE. Protected PII is defined as any data that, if compromised, could cause harm to an individual such as identify theft. Protected PII includes, but is not limited to:

19 Federal Assistance Reporting Checklist
 Social Security Numbers in any form;
 Place of Birth associated with an individual;
 Date of Birth associated with an individual;
 Mother’s maiden name associated with an individual;
 Biometric record associated with an individual;
 Fingerprint;
 Iris Scan;
 DNA;
 Medical history information associated with an individual;  Medical conditions, including history of disease;
 Metric information, e.g., weight, height, blood pressure;  Criminal history associated with an individual;
 Ratings;
 Disciplinary actions;
 Passport number;
 Educational transcripts;
 Financial information associated with an individual;
 Credit card numbers; and
 Security clearance history or related information (not including actual clearances held).

OMB Number: 4040-0006
Expiration Date: 02/28/2025BUDGE
T INFORMATION - Non-Construction Programs

2. Program/Project
Title1. Program/Project Identification No.

Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021
SE0000418
Oakland3. Name and Address 4. Program/Project Start Date

5. Completion Date
07/01/2023
06/30/2025
250 Frank H. Ogawa Plaza, Suite 4314
Oakland, CA 946120000
Total
(g)
Non-Federal
(f)
Federal
(e)
Non-Federal
(d)
New or Revised BudgetEstimated Unobligated Funds
Federal
(c)
Federal
Catalog No.
(b)
Grant Program
Function or
Activity
(a)

SECTION A - BUDGET SUMMARY

81.128 $ 0.00 $ 405,710.001. Federal $ 405,710.00

2. 3.

4. $ 0.00 $ 0.00 $ 405,710.00 $ 0.00

5. TOTAL $ 405,710.00

SECTION B - BUDGET CATEGORIES
Grant Program, Function or Activity Total6. Object Class Categories (5)(4)(3)(2)(1) DOE
a. Personnel $ 0.00 $ 0.00
b. Fringe Benefits $ 0.00 $ 0.00
c. Travel $ 0.00 $ 0.00
d. Equipment $ 0.00 $ 0.00
e. Supplies $ 0.00 $ 0.00
f. Contract $ 405,710.00 $ 405,710.00
g. Construction $ 0.00 $ 0.00
h. Other Direct Costs $ 0.00 $ 0.00
i. Total Direct Charges $ 405,710.00 $ 405,710.00
j. Indirect Costs $ 0.00 $ 0.00
k. Totals $ 405,710.00 $ 405,710.00

7. Program Income $ 0.00 $ 0.00
Standard Form 424A (Rev. 7-97)
Prescribed by OMB Circular A-102
Previous Edition Usable Authorized for Local Reproduction Attachment 3
DE-SE0000418.0000
Remarks
Budget Justification uploaded to SF424.

U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

BUDGET INFORMATION REMARKS
Grant Number: SE0000418,      State: CA
Recipient: Oakland
PAGE, 04/24/2024 12:50:06 PM
Standard Form 424A (Rev. 7-97)
Prescribed by OMB Circular A-102

Page 1 ends

Attachment 3
DE-SE0000418.0000
Attachment 4
DE-SE0000418.0000

Intellectual Property Provisions (NRD-821)
Nonresearch and Development

Intellectual property rights are subject to 2 CFR 200.315 (e.g. institution of higher education or nonprofit organizations) or 2 CFR 910.362 (e.g. for-profit).

EECBG Program: Energy Efficiency and Conservation Strategy Template for Local Governments Local governments must submit a proposed Energy Efficiency and Conservation Strategy (EECS) to the Department of Energy (DOE) to meet the statutory requirements for the Energy Efficiency and Conservation Block Grant (EECBG) Program. The proposed EECS must include the information contained in Part A of this template. Local governments may use this streamlined EECS Template to meet the requirement, but the template is not required. If a local government chooses to submit an EECS using an alternative format, the information outlined in Part A must be included in the submission.

Local governments have the option of submitting their EECS at the time of application or no later than 1 year after the effective date of the award. If the latter option is chosen, the EECS should be a comprehensive strategy that covers, at a minimum, all items detailed in this template. DOE will provide informational resources and technical assistance to support the development of comprehensive strategies.

Local governments that do not submit an EECS with their application must submit an EECBG Program Activity File with their  application and select Activity 1 (Energy Efficiency and Conservation Strategy).

Part A
Grantee:  Oakland
Date:  3/22/2024
UEI Number:  GBDMTM5J75R6
Program Contact Email:
1) Local governments must include within their proposed strategy a description of their goals for increased energy efficiency and conservation in the jurisdiction. Does your local government have existing energy efficiency and conservation or related goals? a. Yes
i. What goals do you have? (check all that apply)

1. GHG reduction goal
a. Specific goal (e.g., 80% GHG reduced from 1990 levels):

According to the City of Oakland's Equitable Climate Action Plan, the City has committed to reach carbon neutrality by 2045, with zero­emission building by 2040.
b. By what year? (e.g., 2050)
2045

2. Energy use reduction goal
a. Specific goal:
b. By what year?

3. Clean energy use goal
a. Specific goal:

The City of Oakland also has a Joint Power Agreement with Ava Community Choice Aggregator, which has a goal to provide 100% clean, renewable energy by 2030.The City of Oakland is currently considering opting up to offer 100% renewable energy to Oakland residents as a baseline.

U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 1 ends

Attachment 5
DE-SE0000418.0000
b. By what year?
2030

4. EV adoption goal
a. Specific goal:

The City of Oakland adopted its Zero Emission Vehicle Action Plan in 2023, which aims to reach 100% zero emission vehicles in new car sales by 2035 and to have all zero­emission vehicles in Oakland by 2045. b. By what year?
2045

5. Job creation goal
a. Specific goal:
b. By what year?

6. Job quality goal
a. Specific goal:
b. By what year?

7. Other
a. Specific goal:
b. By what year?
b. No, our local government does not have an existing goal, but we are selecting the following goal as part of our strategy. If you select option 5, you must also select from options 1­4 or option 6 (may select more than one option). i. Carbon neutrality by 2050 or sooner
ii. Reduce energy use by 50% by 2050 or sooner
iii. 100% carbon­free energy use by 2050 or sooner
iv. 80% EV adoption by 2050 or sooner
v. Pay prevailing wages for all construction and maintenance projects by 2025 U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 2 ends

Attachment 5
DE-SE0000418.0000
vi. Other
2) Does your local government have an existing plan or strategy document (e.g., climate action plan, energy conservation plan, comprehensive energy plan, etc.) to reduce energy use, increase energy efficiency, reduce emissions, or train workers for high­quality energy efficiency jobs? a. Yes
i. Strategy document uploaded:
ii. Do you intend to update your plan in the next two years?

1. Yes
a. Are you planning to use any of your EECBG Program funds to update your plan? i. Yes
ii. No
b. What updates do you intend to make to your plan?
b. No
i. Please briefly describe your strategy to achieve your goals listed in Question 1 The City of Oakland envisions a whole­of­society approach to tackle the climate crisis and redress historic discrimination that created unequal environmental burdens and distribution of resources. Working together in partnership with community stakeholders, the City of Oakland is coordinating across our Public Works, Economic and Workforce Develpment, Planning and Building, Transportation, and Housing and Community Development departments to ensure holistic solutions to mitigate climate change while also bolstering community resilience. The City of Oakland is actively pursuing grants, sponsorships, and other creative financing mechanisms to enhance staff capacity and implement projects to deliver health safety and economic benefits to Oakland residents. 3) Are you planning to use a blueprint (see Section 4.5 of the EECBG Program Formula Grant Application Instructions document for more details)? a. Yes
i. Which one(s)?
Energy Planning

1. Energy Planning
Efficient Buildings
2a. Energy Efficiency ­ Energy Audits and Building Upgrades 2b. Energy Savings Performance Contracts: Energy Efficiency and Electrification in Government Buildings 2c. Building Electrification Campaign
2d. Building Performance Standards & Stretch Codes
Renewables
3a. Solar & Storage ­ Power Purchase Agreements and Direct Ownership 3b. Community Solar
3c. Solarize Campaign
3d. Renewable Resource Planning for Rural and Tribal Communities Electric Transportation
4a. Electric Vehicles and Fleet Electrification
4b. EV Charging Infrastructure for the Community
Finance

5. Unlocking Sustainable Financing Solutions for Energy Projects and Programs with Revolving Loan Funds Workforce

6. Workforce Development
ii. How does this blueprint help you meet your strategy/goals? U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 3 ends

b. No 
i. What category of work do you plan to apply your EECBG Program funds to? (check all that apply)

1. Strategy development
a. Developing goals
b. Developing measures to track progress 
c. Providing annual reporting on goals

2. Technical consultant services to assist in strategy development 

3. Building energy audits
a. Residential
b. Commercial
c. Industrial
d. Municipal 

4. Financial programs
a. Loan programs
b. Performance contracting programs
c. Rebates/grants
d. Incentives
e. Other

5. Energy efficiency retrofits
a. Residential
b. Commercial
c. Industrial
d. Municipal

6. Energy efficiency and conservation programs for buildings and facilities a. Residential
b. Commercial
c. Industrial
d. Municipal

7. Transportation Programs
a. Electric vehicle planning
i. Municipal
ii. Communitywide
b. Purchasing of electric vehicles
c. Installation of electric vehicle chargers
i. Municipal
ii. Communitywide
d. Use of flex time by employers
e. Satellite work centers
f. Zoning guidelines or requirements that promote energy efficient development g. Infrastructure, such as bike lanes and pathways and pedestrian walkways U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 4 ends

h. Synchronization of traffic signals
i. Public transit system improvement investments
j. Other

8. Building codes and inspection
a. Updating building codes
b. Improving enforcement/compliance with building codes c. Building performance standards
d. Other

9. Energy distribution technologies for energy efficiency a. Distributed resources
b. District heating and cooling systems
d. Other

10. Material conservation programs
a. Source reduction
b. Recycling
c. Composting
d. Sustainable procurement
e. Other

11. Reduction and capture of methane and other greenhouse gases generated a. Landfills
b. Wastewater treatment facilities
c. Other

12. Traffic signals and street lighting upgrades

13. Renewable energy on government buildings
a. Solar
b. Wind
c. Fuel cells
d. Biomass

14. Programs for financing, purchasing, and installing energy efficiency, renewable energy, and zero­emission transportation (and associated infrastructure)

15. Other (requires approval of Secretary)
ii. How will your use of funds help your unit of government meet its strategy/goals? The City of Oakland's Equitable Climate Action Plan has several goals to improve municipal buildings to reduce emissions and enhance community resilience (seeB­5:Require All Major Retrofits of City Facilities to be All­Electric and A­1: Fund Creation and Operation of Resilience Hubs) However, to date, there has not been an updated, comprehensive energy assessment of municipal facilities to determine the priority and needs of these building upgrades. With EECBG funds, such a strategy comment can be created to guide capital improvement project to enable better project delivery and more efficient use of public dollars.
iii. Provide a brief description of your project(s)?
The City of Oakland plans to use the EECBG funding to conduct citywide facility assessments to determine energy conservation, structural, MEP, ad overall building health metrics to inform future capital improvement planning needs and funding requests. 4) Local governments must coordinate and share information with the State in which the eligible local government is located regarding activities carried out using the grant to maximize the energy efficiency and conservation benefits under the EECBG Program. Have you coordinated and shared your planned activities with your State?
a. Yes 
U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 5 ends

i. Please describe how you plan to coordinate with your State The City of Oakland submits reporting documentation the SF424 Local Clearinghouse, which the State of California uses to track and coordinate federal grant applications across the State.
5) Local governments must take into account any plans for the use of funds by adjacent eligible local governments that receive grants under the EECBG Program.

Have you taken into account how adjacent eligible units of local governments plan to use their funds? a. Yes 
Part B
1) Do you plan to collaborate with other eligible units of government? a. Yes, we are going to form a team and apply through a joint application i. List the names of the units of government

1. Which unit of government is serving as the lead applicant? ii. Please describe what your team plans to work on together b. Yes, we are going to informally collaborate
i. List the names of the units of government
ii. Please describe your planned collaboration
c. We are not yet sure if we are going to collaborate with others d. No 
2) Are you planning to partner with other organizations including utilities, energy industry and financial companies, community­based organizations, labor unions, and other non­profit organizations for your project?
a. Yes 
i. Please list your partners
The City of Oakland plans to issue a competitive RFP for engineering consulting firms to complete the municipal facility energy assessments with staff U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 6 ends

guidance.
b. No
3) Have you engaged local stakeholders (such as utilities, energy industry and financial companies, community­based organizations, labor unions, and other non­profit organizations) in the development of your plan and/or how you intend to use your EECBG Program allocation? a. Yes 
b. No
4) Will this EECBG Program funding help you to access additional sources of funding? a. Yes 
i. What kind? (check all that apply)

1. Local government

2. State government 

3. Federal government 

4. Philanthropic 

5. Private sector 

6. Other
b. No
i. Would you like assistance in identifying other sources of funding? a. Yes
b. No
5) Do you anticipate needing support for your project development/implementation? a. Yes
i. What kind? (check all that apply)

1. Policy, planning and program design

2. Retrofits

3. Engineering and modeling

4. Stakeholder engagement

5. Program administration and implementation support

6. Outreach, education and advertising

7. Other
b. No 
6) Do you anticipate the project(s) you use this funding for will continue after the EECBG Program funding period? a. Yes
i. Describe how the projects(s) have been designed to ensure that it sustains benefits beyond the EECBG Program funding period b. No 
i. What would help you to continue? (check all that apply)

1. Local sustainable financing

2. Public and local political support
U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 7 ends

3. Staff capacity

4. Other 
7) How will your project(s) benefit disadvantaged communities? (check all that apply) a. Benefits include (but are not limited to) measurable direct or indirect investments or positive project outcomes that achieve or contribute to the following in disadvantaged communities:
i. A decrease in energy burden 
ii. A decrease in environmental exposure and burdens 
iii. An increase in access to low­cost capital
iv. An increase in job quality (including paying prevailing wages for construction and maintenance projects by 2025) v. An increase in clean energy enterprise creation and contracting (e.g., minority­owned or disadvantaged business enterprises) vi. An increase in clean energy jobs, job pipeline, and job training for individuals from disadvantaged communities  vii. An increase in parity in clean energy technology access and adoption  viii. An increase in energy democracy 
ix. Other

1. Please explain
8) How will your strategy support the goal that 40% of the overall benefits of certain federal investments flow to disadvantaged communities, in line with the Justice40 initiative?
As a result of the City of Oakland's equity­centered capital improvement prioritization process, more than 50% of existing investments flow to disadvantage communities in the form of infrastructure upgrades to parks, stormwater systems, roads, and recreation centers. The municipal facility energy assessment will support the current prioritization process and perhaps accelerate project implementation because it will provide a foundational pre­planning analysis critical for any project to start,.

U.S. Department of Energy
Energy Efficiency and Conservation Block Grant Program – Bipartisan Infrastructure Law 2021 (EECBGBIL)

STRATEGY
Grant Number: SE0000418,      State: CA,      Program Year: 2023 Recipient: Oakland
PAGE, 04/24/2024 12:50:12 PM

Page 8 ends

Template Version 08/05/2022
Special Terms and Conditions
Award No. DE-SE0000418.0000 With Oakland

Special Terms and Conditions

Oakland (“Recipient”), which is identified in Block 5 of the Assistance Agreement, and the Office of State and Community Energy Programs (“SCEP”), and Energy Efficiency and Conservation Block Grant Program (“EECBG”), an office within the United States Department of Energy (“DOE”), enter into this Award, referenced above, to achieve the project objectives and the technical milestones and deliverables stated in Attachment 1 to this Award.

This Award consists of the following documents, including all terms and conditions therein:

Assistance Agreement
Special Terms and Conditions
Attachment 1 Activity File
Attachment 2 Federal Assistance Reporting Checklist and Instructions
Attachment 3 Budget Information SF-424A
Attachment 4 Intellectual Property Provisions
Attachment 5 Energy Efficiency and Conservation Strategy

The following are incorporated into this Award by reference:
 DOE Assistance Regulations, 2 CFR part 200 as amended by 2 CFR part 910 at http://www.eCFR.gov.
 National Policy Requirements (November 12, 2020) at
http://www.nsf.gov/awards/managing/rtc.jsp.
 The Recipient’s application/proposal as approved by SCEP.  Public Law 117-58, also known as the Bipartisan Infrastructure Law (BIL).

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

2 Table of Contents
Subpart A. General Provisions ............................................................................................................................ 4 Term 1. Legal Authority and Effect ....................................................................................................................... 4 Term 2. Flow Down Requirement......................................................................................................................... 4 Term 3. Compliance with Federal, State, and Municipal Law ............................................................................. 4 Term 4. Inconsistency with Federal Law .............................................................................................................. 4 Term 5. Federal Stewardship ................................................................................................................................ 4 Term 6. Foreign National Participation ................................................................................................................ 4 Term 7. Post-Award Due Diligence Reviews ........................................................................................................ 5 Term 8. NEPA Requirements ................................................................................................................................ 5 Term 9. Performance of Work in United States ................................................................................................... 7 Term 10. Notice Regarding the Purchase of American-Made Equipment and Products – Sense of Congress .... 7 Term 11. Reporting Requirements ......................................................................................................................... 7 Term 12. Lobbying ................................................................................................................................................... 8 Term 13. Publications ............................................................................................................................................. 8 Term 14. No-Cost Extension ................................................................................................................................... 9 Term 15. Property Standards .................................................................................................................................. 9 Term 16. Insurance Coverage ................................................................................................................................. 9 Term 17. Real Property ........................................................................................................................................... 9 Term 18. Equipment ............................................................................................................................................. 10 Term 19. Supplies .................................................................................................................................................. 10 Term 20. Continued Use of Real Property and Equipment .................................................................................. 10 Term 21. Property Trust Relationship .................................................................................................................. 11 Term 22. Record Retention ................................................................................................................................... 11 Term 23. Audits ..................................................................................................................................................... 11 Term 24. Indemnity ............................................................................................................................................... 12 Subpart B. Financial Provisions.......................................................................................................................... 13 Term 25. Maximum Obligation ............................................................................................................................. 13 Term 26. Refund Obligation.................................................................................................................................. 13 Term 27. Allowable Costs ..................................................................................................................................... 13 Term 28. Indirect Costs ......................................................................................................................................... 13 Term 29. Decontamination and/or Decommissioning (D&D) Costs .................................................................... 15 Term 30. Use of Program Income ......................................................................................................................... 15 Term 31. Payment Procedures ............................................................................................................................. 15 Term 32. Budget Changes ..................................................................................................................................... 16 Subpart C. Miscellaneous Provisions ................................................................................................................ 17 Term 33. Environmental, Safety and Health Performance of Work at DOE Facilities ........................................ 17 Term 34. Reporting Subawards and Executive Compensation ............................................................................ 17 Term 35. System for Award Management and Universal Identifier Requirements ........................................... 21 Term 36. Nondisclosure and Confidentiality Agreements Assurances ............................................................... 23 Term 37. Subrecipient Change Notification ......................................................................................................... 24 Term 38. Conference Spending ............................................................................................................................. 25 Term 39. Recipient Integrity and Performance Matters ...................................................................................... 25 Term 40. Export Control ........................................................................................................................................ 27 Term 41. Interim Conflict of Interest Policy for Financial Assistance .................................................................. 27 Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

3 Term 42. Organizational Conflict of Interest ........................................................................................................ 28 Term 43. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment ............ 29 Term 44. Human Subjects Research ..................................................................................................................... 29 Term 45. Fraud, Waste and Abuse ....................................................................................................................... 31 Term 46. Buy American Requirement for Infrastructure Projects ...................................................................... 31 Term 47. Affirmative Action and Pay Transparency Requirements .................................................................... 36 Term 48. Potentially Duplicative Funding Notice ................................................................................................ 37 Term 49. Transparency of Foreign Connections................................................................................................... 37 Term 50. Foreign Collaboration Considerations .................................................................................................. 38 Subpart D. Award-Specific Provisions ................................................................................................................. 39 Term 51. Reporting, Tracking and Segregation of Incurred Costs ....................................................................... 39 Term 52. Davis-Bacon Requirements ................................................................................................................... 39 Term 53. Signage ................................................................................................................................................... 41

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

4 Subpart A. General Provisions

Term 1. Legal Authority and Effect
A DOE financial assistance award is valid only if it is in writing and is signed, either in writing or electronically, by a DOE Contracting Officer.

The Recipient may accept or reject the Award. A request to draw down DOE funds or acknowledgement of award documents by the Recipient’s authorized representative through electronic systems used by DOE, specifically FedConnect, constitutes the Recipient's acceptance of the terms and conditions of this Award. Acknowledgement via FedConnect by the Recipient’s authorized representative constitutes the Recipient's electronic signature.

Term 2. Flow Down Requirement
The Recipient agrees to apply the terms and conditions of this Award, including the Intellectual Property Provisions, to all subrecipients (and contractors, as appropriate). See, 2 CFR 200.101(b)(2), 2 CFR 200.327, and 2 CFR 200.332.

Term 3. Compliance with Federal, State, and Municipal Law The Recipient is required to comply with applicable Federal, state, and local laws and regulations for all work performed under this Award. The Recipient is required to obtain all necessary Federal, state, and local permits, authorizations, and approvals for all work performed under this Award.

Term 4. Inconsistency with Federal Law
Any apparent inconsistency between Federal statutes and regulations and the terms and conditions contained in this Award must be referred to the DOE Award Administrator for guidance.

Term 5. Federal Stewardship
SCEP will exercise normal Federal stewardship in overseeing the project activities performed under this Award. Stewardship activities include, but are not limited to, conducting site visits; reviewing performance and financial reports; providing technical assistance and/or temporary intervention in unusual circumstances to address deficiencies that develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion to ensure that the project objectives have been accomplished.

Term 6. Foreign National Participation
If the Recipient (including any of its subrecipients and contractors) anticipates involving foreign nationals in the performance of the Award, the Recipient must, upon DOE’s request, provide DOE with specific information about each foreign national to ensure compliance with the Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

5 requirements for participation and access approval. The volume and type of information required may depend on various factors associated with the Award. The DOE Contracting Officer will notify the Recipient if this information is required.

DOE may elect to deny a foreign national’s participation in the Award. Likewise, DOE may elect to deny a foreign national’s access to a DOE sites, information, technologies, equipment, programs or personnel.

Term 7. Post-Award Due Diligence Reviews
During the life of the Award, DOE may conduct ongoing due diligence reviews, through Government resources, to identify potential risks of undue foreign influence. In the event, a risk is identified, DOE may require risk mitigation measures, including but not limited to, requiring an individual or entity not participate in the Award.

Term 8. NEPA Requirements
DOE must comply with the National Environmental Policy Act (NEPA) prior to authorizing the use of Federal funds. Based on all information provided by the Recipient, SCEP has made a NEPA determination by issuing a categorical exclusion (CX) for all activities listed in the Activity File approved by the Contracting Officer and the DOE NEPA Determination. The Recipient is thereby authorized to use Federal funds for the defined project activities, subject the Recipient’s compliance with the conditions stated below and except where such activity is subject to a restriction set forth elsewhere in this Award.

Condition(s):

1. This NEPA Determination only applies to activities funded by the Administrative and Legal Requirements Document (ALRD) for the EECBG Program Formula Infrastructure Investment and Jobs Act (EECBG Formula - IIJA) awarded to non-tribal recipients proposing non-ground disturbing activities within states that have a DOE executed Historic Preservation Programmatic Agreement.

2. Activities not listed under "Blueprints and additional activities” within this NEPA determination are subject to additional NEPA review and approval by DOE. For activities requiring additional NEPA review, Recipients must complete the environmental questionnaire (EQ-1) found at https: //www.eere-pmc.energy.gov/NEPA.aspx and receive notification from DOE that the NEPA review has been completed and approved by the Contracting Officer prior to initiating the project or activities.

3. Activities proposed on tribal lands or tribal properties would be restricted to homes/buildings less than forty-five (45) years old and without ground disturbance. Recipients must contact the DOE Project Officer for a Historic Preservation Worksheet to request a review of activities that are listed below on tribal homes/buildings forty-five (45) years and older and/or ground Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

6 disturbing activities. The DOE NEPA team must review the Historic Preservation Worksheet and notify the Recipient’s DOE Project Officer before activities listed on the Historic Preservation Worksheet may begin.

4. This authorization does not include activities where the following elements exist:
extraordinary circumstances; cumulative impacts or connected actions that may lead to significant effects on the human environment; or any inconsistency with the "integral elements" (as contained in 10 CFR Part 1021, Appendix B) as they relate to a particular project.

5. The Recipient must identify and promptly notify DOE of extraordinary circumstances, cumulative impacts of connected actions that may lead to significant effects on the human environment, or any inconsistency with the “integral elements” (as contained in 10 CFR Part 1021, Appendix B) as they relate to project activities.

6. Recipients must have a DOE executed Historic Preservation Programmatic Agreement and adhere to the terms and restrictions of its DOE executed Historic Preservation Programmatic Agreement. DOE executed Historic Preservation Programmatic Agreements are available at https://www.energy.gov/node/8125997

7. Recipients are responsible for reviewing the online NEPA and Historic preservation training atwww.energy.gov/node/4816816 and contacting [email protected] with any EECBG NEPA or historic preservation questions.

8. Recipients are required to submit an annual Historic Preservation Report in the Performance and Accountability for Grants in Energy system (PAGE) at https://www.page.energy.gov/default.aspx.

9. Most activities listed under “Blueprints and additional activities” within this NEPA determination are more restrictive than the Categorical Exclusion. The restrictions included in the “Blueprints and additional activities” must be followed.

10. This authorization excludes any activities that are otherwise subject to a restriction set forthelsewhere in the award.

This authorization is specific to the project activities and locations as described in the Activity File approved by the Contracting Officer and the DOE NEPA Determination.

If the Recipient later intends to add to or modify the activities or locations as described in the approved Activity File and the DOE NEPA Determination, those new activities/locations or modified activities/locations are subject to additional NEPA review and are not authorized for Federal funding until the Contracting Officer provides written authorization on those additions Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

7 or modifications. Should the Recipient elect to undertake activities or change locations prior to written authorization from the Contracting Officer, the Recipient does so at risk of not receiving Federal funding for those activities, and such costs may not be recognized as allowable cost share.

Term 9. Performance of Work in United States
A. Requirement
All work performed under this Award must be performed in the United States unless the Contracting Officer provides a waiver. This requirement does not apply to the purchase of supplies and equipment; however, the Recipient should make every effort to purchase supplies and equipment within the United States. The Recipient must flow down this requirement to its subrecipients.

B. Failure to Comply
If the Recipient fails to comply with the Performance of Work in the United States requirement, the Contracting Officer may deny reimbursement for the work conducted outside the United States and such costs may not be recognized as allowable Recipient cost share of if the work is performed by the Recipient, subrecipients, contractors or other project partners.

C. Waiver for Work Outside the U.S.

All work performed under this Award must be performed in the United States. However, the Contracting Officer may approve the Recipient to perform a portion of the work outside the United States under limited circumstances. The Recipient must obtain a waiver from the Contracting Officer prior to conducting any work outside the U.S. To request a waiver, the Recipient must submit a written waiver request to the Contracting Officer, which includes the information as required in the FOA that the Award was selected under.

For the rationale, the Recipient must demonstrate to the satisfaction of the Contracting Officer that the performance of work outside the United States would further the purposes of the FOA that the Award was selected under and is in the economic interests of the United States. The Contracting Officer may require additional information before considering such request.

Term 10. Notice Regarding the Purchase of American-Made Equipment and Products – Sense of Congress
It is the sense of the Congress that, to the greatest extent practicable, all equipment and products purchased with funds made available under this Award should be American-made.

Term 11. Reporting Requirements
The reporting requirements for this Award are identified on the Federal Assistance Reporting Checklist, attached to this Award. Failure to comply with these reporting requirements is Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

8 considered a material noncompliance with the terms of the Award. Noncompliance may result in withholding of future payments, suspension, or termination of the current award, and withholding of future awards. A willful failure to perform, a history of failure to perform, or unsatisfactory performance of this and/or other financial assistance awards, may also result in a debarment action to preclude future awards by federal agencies.

Term 12. Lobbying
By accepting funds under this Award, the Recipient agrees that none of the funds obligated on the Award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. § 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation.

Term 13. Publications
The Recipient is required to include the following acknowledgement in publications arising out of, or relating to, work performed under this Award, whether copyrighted or not:

 Acknowledgment: “This material is based upon work supported by the U.S. Department of Energy’s Office of State and Community Energy Programs (SCEP) under the Energy Efficiency and Conservation Block Grant Program (EECBG) Award Number DE- SE0000418.”

 Full Legal Disclaimer: “This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof.

The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.”

Abridged Legal Disclaimer: “The views expressed herein do not necessarily represent the views of the U.S. Department of Energy or the United States Government.”

Recipients should make every effort to include the full Legal Disclaimer. However, in the event that recipients are constrained by formatting and/or page limitations set by the publisher, the abridged Legal Disclaimer is an acceptable alternative.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

9 Term 14. No-Cost Extension
As provided in 2 CFR 200.308, the Recipient must provide the Contracting Officer with notice in advance if it intends to utilize a one-time, no-cost extension of this Award. The notification must include the supporting reasons and the revised period of performance. The Recipient must submit this notification in writing to the Contracting Officer and DOE Technology Manager/ Project Officer at least 30 days before the end of the current budget period.

Any no-cost extension will not alter the project scope, milestones, deliverables, or budget of this Award.

Term 15. Property Standards
The complete text of the Property Standards can be found at 2 CFR 200.310 through 200.316.

Also see 2 CFR 910.360 for additional requirements for real property and equipment for For- Profit recipients.

Term 16. Insurance Coverage
See 2 CFR 200.310 for insurance requirements for real property and equipment acquired or improved with Federal funds. Also see 2 CFR 910.360(d) for additional requirements for real property and equipment for For-Profit recipients.

Term 17. Real Property
Subject to the conditions set forth in 2 CFR 200.311, title to real property acquired or improved under a Federal award will conditionally vest upon acquisition in the non-Federal entity. The non-Federal entity cannot encumber this property and must follow the requirements of 2 CFR 200.311 before disposing of the property.

Except as otherwise provided by Federal statutes or by the Federal awarding agency, real property will be used for the originally authorized purpose as long as needed for that purpose.

When real property is no longer needed for the originally authorized purpose, the non-Federal entity must obtain disposition instructions from DOE or pass-through entity. The instructions must provide for one of the following alternatives: (1) retain title after compensating DOE as described in 2 CFR 200.311(c)(1); (2) Sell the property and compensate DOE as specified in 2 CFR 200.311(c)(2); or (3) transfer title to DOE or to a third party designated/approved by DOE as specified in 2 CFR 200.311(c)(3).

See 2 CFR 200.311 for additional requirements pertaining to real property acquired or improved under a Federal award. Also see 2 CFR 910.360 for additional requirements for real property for For-Profit recipients.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

10 Term 18. Equipment
Subject to the conditions provided in 2 CFR 200.313, title to equipment (property) acquired under a Federal award will conditionally vest upon acquisition with the non-Federal entity. The non-Federal entity cannot encumber this property and must follow the requirements of 2 CFR 200.313 before disposing of the property.

A state must use equipment acquired under a Federal award by the state in accordance with state laws and procedures.

Equipment must be used by the non-Federal entity in the program or project for which it was acquired as long as it is needed, whether or not the project or program continues to be supported by the Federal award. When no longer needed for the originally authorized purpose, the equipment may be used by programs supported by DOE in the priority order specified in 2 CFR 200.313(c)(1)(i) and (ii).

Management requirements, including inventory and control systems, for equipment are provided in 2 CFR 200.313(d).

When equipment acquired under a Federal award is no longer needed, the non-Federal entity must obtain disposition instructions from DOE or pass-through entity.

Disposition will be made as follows: (1) items of equipment with a current fair market value of $5,000 or less may be retained, sold, or otherwise disposed of with no further obligation to DOE; (2) Non-Federal entity may retain title or sell the equipment after compensating DOE as described in 2 CFR 200.313(e)(2); or (3) transfer title to DOE or to an eligible third party as specified in 2 CFR 200.313(e)(3).

See 2 CFR 200.313 for additional requirements pertaining to equipment acquired under a Federal award. Also see 2 CFR 910.360 for additional requirements for equipment for For-Profit recipients. See also 2 CFR 200.439 Equipment and other capital expenditures.

Term 19. Supplies
See 2 CFR 200.314 for requirements pertaining to supplies acquired under a Federal award. See also 2 CFR 200.453 Materials and supplies costs, including costs of computing devices.

Term 20. Continued Use of Real Property and Equipment
Real property and equipment purchased with project funds (federal share and recipient cost share) under this Award are subject to the requirements at 2 CFR 200.311, 200.313, and 200.316 (non-Federal entities, except for-profit entities) and 2 CFR 910.360 (for-profit entities).

The Recipient may continue to use the real property and equipment after the conclusion of the award period of performance so long as the Recipient:

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

11 a. continues to use the property for the authorized project purposes; b. complies with the applicable reporting requirements and regulatory property standards;
c. as applicable to for-profit entities, UCC filing statements are maintained; and d. submits a written Request for Continued Use for DOE authorization, which is approved by the DOE Contracting Officer.

The Recipient must request authorization from the Contracting Officer to continue to use the property for the authorized project purposes beyond the award period of performance (“Request for Continued Use”). The Recipient’s written Request for Continued Use must identify the property and include: a summary of how the property will be used (must align with the authorized project purposes); a proposed use period (e.g., perpetuity, until fully depreciated, or a calendar date where the Recipient expects to submit disposition instructions); acknowledgement that the recipient shall not sell or encumber the property or permit any encumbrance without prior written DOE approval; current fair market value of the property; and an Estimated Useful Life or depreciation schedule for equipment.

When the property is no longer needed for authorized project purposes, the Recipient must request disposition instructions from DOE. For-profit entity disposition requirements are set forth at 2 CFR 910.360. Property disposition requirements for other non-federal entities are set forth in 2 CFR 200.310 – 200.316.

Term 21. Property Trust Relationship
Real property, equipment, and intangible property, that are acquired or improved with a Federal award must be held in trust by the non-Federal entity as trustee for the beneficiaries of the project or program under which the property was acquired or improved. See 2 CFR 200.316 for additional requirements pertaining to real property, equipment, and intangible property acquired or improved under a Federal award.

Term 22. Record Retention
Consistent with 2 CFR 200.334 through 200.338, the Recipient is required to retain records relating to this Award.

Term 23. Audits
A. Government-Initiated Audits
The Recipient must provide any information, documents, site access, or other assistance requested by SCEP, DOE or Federal auditing agencies (e.g., DOE Inspector General, Government Accountability Office) for the purpose of audits and investigations. Such assistance may include, but is not limited to, reasonable access to the Recipient’s records relating to this Award.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

12 Consistent with 2 CFR part 200 as amended by 2 CFR part 910, DOE may audit the Recipient’s financial records or administrative records relating to this Award at any time. Government-initiated audits are generally paid for by DOE.

DOE may conduct a final audit at the end of the project period (or the termination of the Award, if applicable). Upon completion of the audit, the Recipient is required to refund to DOE any payments for costs that were determined to be unallowable. If the audit has not been performed or completed prior to the closeout of the award, DOE retains the right to recover an appropriate amount after fully considering the recommendations on disallowed costs resulting from the final audit.

DOE will provide reasonable advance notice of audits and will minimize interference with ongoing work, to the maximum extent practicable.

B. Annual Independent Audits (Single Audit or Compliance Audit) The Recipient must comply with the annual independent audit requirements in 2 CFR 200.500 through .521 for institutions of higher education, nonprofit organizations, and state and local governments (Single audit), and 2 CFR 910.500 through .521 for for-profit entities (Compliance audit).

The annual independent audits are separate from Government-initiated audits discussed in part A. of this Term and must be paid for by the Recipient. To minimize expense, the Recipient may have a Compliance audit in conjunction with its annual audit of financial statements. The financial statement audit is not a substitute for the Compliance audit. If the audit (Single audit or Compliance audit, depending on Recipient entity type) has not been performed or completed prior to the closeout of the award, DOE may impose one or more of the actions outlined in 2 CFR 200.339, Remedies for Noncompliance.

Term 24. Indemnity
The Recipient shall indemnify DOE and its officers, agents, or employees for any and all liability, including litigation expenses and attorneys' fees, arising from suits, actions, or claims of any character for death, bodily injury, or loss of or damage to property or to the environment, resulting from the project, except to the extent that such liability results from the direct fault or negligence of DOE officers, agents or employees, or to the extent such liability may be covered by applicable allowable costs provisions.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

13 Subpart B. Financial Provisions

Term 25. Maximum Obligation
The maximum obligation of DOE for this Award is the total “Funds Obligated” stated in Block 13 of the Assistance Agreement to this Award.

Term 26. Refund Obligation
The Recipient must refund any excess payments received from SCEP, including any costs determined unallowable by the Contracting Officer. Upon the end of the project period (or the termination of the Award, if applicable), the Recipient must refund to SCEP the difference between (1) the total payments received from SCEP, and (2) the Federal share of the costs incurred. Refund obligations under this Term do not supersede the annual reconciliation or true up process if specified under the Indirect Cost Term.

Term 27. Allowable Costs
SCEP determines the allowability of costs through reference to 2 CFR part 200 as amended by 2 CFR part 910. All project costs must be allowable, allocable, and reasonable. The Recipient must document and maintain records of all project costs, including, but not limited to, the costs paid by Federal funds, costs claimed by its subrecipients and project costs that the Recipient claims as cost sharing, including in-kind contributions. The Recipient is responsible for maintaining records adequate to demonstrate that costs claimed have been incurred, are reasonable, allowable and allocable, and comply with the cost principles. Upon request, the Recipient is required to provide such records to SCEP. Such records are subject to audit.

Failure to provide SCEP adequate supporting documentation may result in a determination by the Contracting Officer that those costs are unallowable.

The Recipient is required to obtain the prior written approval of the Contracting Officer for any foreign travel costs.

Term 28. Indirect Costs

A. Indirect Cost Allocation:

The budget for this Award does not include an allocation of segregated indirect billing rates. Therefore, indirect charges shall not be charged under allocated billing rates, nor shall reimbursement be requested for this project for segregated indirect cost billing rates, nor shall any indirect charges for this project be allocated to any other Federally sponsored project. The Recipient cannot claim indirect costs separately as cost share.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

14 B. Fringe Cost Allocation:

The budget for this award does not include an allocation of segregated fringe billing rates. Fringe benefit costs have been found reasonable as incorporated in the Recipient’s burdened labor rate or under an allocated indirect cost billing rate. Therefore, fringe benefit costs shall not be charged as a separate rate allocation to this Award. SCEP will not reimburse fringe benefit costs as a separate budget item. Fringe benefit costs for this Award cannot be allocated as a separate rate allocation to any other Federally sponsored project.

C. Subrecipient Indirect Costs (If Applicable):

The Recipient must ensure its subrecipient’s indirect costs are appropriately managed, have been found to be allowable, and comply with the requirements of this Award and 2 CFR Part 200 as amended by 2 CFR Part 910.

D. Indirect Cost Stipulations:

i. Modification to Indirect Cost Billing Rates
SCEP will not modify this Award solely to provide additional funds to cover increases in the Recipient’s indirect cost billing rate(s). Adjustments to the indirect cost billing rates must be approved by the Recipient’s Cognizant Agency or Cognizant Federal Agency Official.

The Recipient must provide a copy of an updated NICRA or indirect rate proposal to the DOE Award Administrator in order to increase indirect cost billing rates. If the Contracting Officer provides prior written approval, the Recipient may incur an increase in the indirect cost billing rates.

Reimbursement will be limited by the budgeted dollar amount for indirect costs for each budget period as shown in Attachment 3 to this Award.

ii. Award Closeout
The closeout of the DOE award does not affect (1) the right of the DOE to disallow costs and recover funds on the basis of a later audit or other review; (2) the requirement for the Recipient to return any funds due as a result of later refunds, corrections or other transactions including final indirect cost billing rate adjustments; and (3) the ability of the DOE to make financial adjustments to a previously closed award resolving indirect cost payments and making final payments.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

15 Term 29. Decontamination and/or Decommissioning (D&D) Costs Notwithstanding any other provisions of this Award, the Government shall not be responsible for or have any obligation to the Recipient for (1) Decontamination and/or Decommissioning (D&D) of any of the Recipient’s facilities, or (2) any costs which may be incurred by the Recipient in connection with the D&D of any of its facilities due to the performance of the work under this Award, whether said work was performed prior to or subsequent to the effective date of the Award.

Term 30. Use of Program Income
If the Recipient earns program income during the project period as a result of this Award, the Recipient must add the program income to the funds committed to the Award and used to further eligible project objectives.

Term 31. Payment Procedures

A. Method of Payment
Payment will be made by reimbursement through the Department of Treasury’s ASAP system.

B. Requesting Reimbursement
Requests for reimbursements must be made through the ASAP system.

C. Adjusting Payment Requests for Available Cash
The Recipient must disburse any funds that are available from repayments to and interest earned on a revolving fund, program income, rebates, refunds, contract settlements, audit recoveries, credits, discounts, and interest earned on any of those funds before requesting additional cash payments from SCEP.

D. Payments
All payments are made by electronic funds transfer to the bank account identified on the Bank Information Form that the Recipient filed with the U.S. Department of Treasury.

E. Unauthorized Drawdown of Federal Funds
For each budget period, the Recipient may not spend more than the Federal share authorized to that particular budget period, without specific written approval from the Contracting Officer. The Recipient must immediately refund SCEP any amounts spent or drawn down in excess of the authorized amount for a budget period. The Recipient and subrecipients shall promptly, but at least quarterly, remit to DOE interest earned on advances drawn in excess of disbursement needs, and shall Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

16 comply with the procedure for remitting interest earned to the Federal government per 2 CFR 200.305, as applicable.

Term 32. Budget Changes
A. Budget Changes Generally
The Contracting Officer has reviewed and approved the SF-424A in Attachment 3 to this Award.

Any increase in the total project cost, whether DOE share or Cost Share, which is stated as “Total” in Block 12 to the Assistance Agreement of this Award, must be approved in advance and in writing by the Contracting Officer.

Any change that alters the project scope, milestones or deliverables requires prior written approval of the Contracting Officer. SCEP may deny reimbursement for any failure to comply with the requirements in this term.

B. Transfers of Funds Among Direct Cost Categories
The Recipient is required to obtain the prior written approval of the Contracting Officer for any transfer of funds among direct cost categories where the cumulative amount of such transfers exceeds or is expected to exceed 10 percent of the total project cost, which is stated as “Total” in Block 12 to the Assistance Agreement of this Award.

The Recipient is required to notify the DOE Technology Manager/Project Officer of any transfer of funds among direct cost categories where the cumulative amount of such transfers is equal to or below 10 percent of the total project cost, which is stated as “Total” in Block 12 to the Assistance Agreement of this Award.

C. Transfer of Funds Between Direct and Indirect Cost Categories The Recipient is required to obtain the prior written approval of the Contracting Officer for any transfer of funds between direct and indirect cost categories. If the Recipient’s actual allowable indirect costs are less than those budgeted in Attachment 3 to this Award, the Recipient may use the difference to pay additional allowable direct costs during the project period so long as the total difference is less than 10% of total project costs and the difference is reflected in actual requests for reimbursement to DOE.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

17 Subpart C. Miscellaneous Provisions

Term 33. Environmental, Safety and Health Performance of Work at DOE Facilities
With respect to the performance of any portion of the work under this Award which is performed at a DOE -owned or controlled site, the Recipient agrees to comply with all State and Federal Environmental, Safety and Health (ES&H) regulations and with all other ES&H requirements of the operator of such site.

Prior to the performance on any work at a DOE-owned or controlled site, the Recipient shall contact the site facility manager for information on DOE and site-specific ES&H requirements.

The Recipient is required apply this provision to its subrecipients and contractors.

Term 34. Reporting Subawards and Executive Compensation

A. Reporting of first-tier subawards

i. Applicability. Unless the Recipient is exempt as provided in paragraph D. of this award term, the Recipient must report each action that equals or exceeds $30,000 in federal funds for a subaward to an entity (see definitions in paragraph E. of this award term).

ii. Where and when to report.

1. The Recipient must report each obligating action described in paragraph A.i. of this award term to https://www.fsrs.gov.

2. For subaward information, report no later than the end of the month following the month in which the obligation was made. (For example, if the obligation was made on November 7 the obligation must be reported no later than December 31.)

iii. What to report. The Recipient must report the information about each obligating action that the submission instructions posted at https://www.fsrs.gov specify.

B. Reporting Total Compensation of Recipient Executives

i. Applicability and what to report. The Recipient must report total compensation for each of its five most highly compensated executives for the Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

18 preceding completed fiscal year, if:

1. The total federal funding authorized to date under this Award equals or exceeds $30,000 as defined in 2 CFR 170.320;

2. In the preceding fiscal year, the Recipient received;

a. 80 percent or more of the Recipient’s annual gross revenues from federal procurement contracts (and subcontracts) and federal financial assistance subject to the Transparency Act, as defined at 2 CFR 170.320 (and subawards); and

b. $25,000,000 or more in annual gross revenues from federal procurement contracts (and subcontracts) and federal
financial assistance subject to the Transparency Act, as defined at 2 CFR 170.320 (and subawards).

3. The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm).

ii. Where and when to report. The Recipient must report executive total compensation described in paragraph B.i. of this award term:

1. As part of the Recipient’s registration profile at https://www.sam.gov.

2. By the end of the month following the month in which this award is made, and annually thereafter.

C. Reporting of Total Compensation of Subrecipient Executives

i. Applicability and what to report. Unless the Recipient is exempt as provided in paragraph D. of this award term, for each first-tier subrecipient under this award, the Recipient shall report the names and total compensation of each of the subrecipient's five most highly compensated executives for the subrecipient's preceding completed fiscal year, if:

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

19 1. In the subrecipient's preceding fiscal year, the subrecipient received:

a. 80 percent or more of its annual gross revenues from federal procurement contracts (and subcontracts) and federal
financial assistance subject to the Transparency Act, as defined at 2 CFR 170.320 (and subawards); and

b. $25,000,000 or more in annual gross revenues from federal procurement contracts (and subcontracts), and federal
financial assistance subject to the Transparency Act (and subawards).

2. The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm).

ii. Where and when to report. The Recipient must report subrecipient executive total compensation described in paragraph C.i. of this award term:

1. To the recipient.

2. By the end of the month following the month during which the Recipient makes the subaward. For example, if a subaward is obligated on any date during the month of October of a given year (i.e., between October 1 and 31), the Recipient must report any required compensation information of the subrecipient by November 30 of that year.

D. Exemptions
If, in the previous tax year, the Recipient had gross income, from all sources, under $300,000, it is exempt from the requirements to report:

i. Subawards; and

ii. The total compensation of the five most highly compensated executives of any subrecipient.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

20 E. Definitions
For purposes of this Award term:

i. Entity means all of the following, as defined in 2 CFR Part 25:

1. A Governmental organization, which is a State, local government, or Indian tribe.

2. A foreign public entity.

3. A domestic or foreign nonprofit organization.

4. A domestic or foreign for-profit organization.

5. A federal agency, but only as a subrecipient under an award or subaward to a non-federal entity.

ii. Executive means officers, managing partners, or any other employees in management positions.

iii. Subaward:

1. This term means a legal instrument to provide support for the performance of any portion of the substantive project or program for which the Recipient received this award and that the recipient awards to an eligible subrecipient.

2. The term does not include the Recipient’s procurement of property and services needed to carry out the project or program (for further explanation, see 2 CFR 200.501 Audit requirements, (f) Subrecipients and Contractors and/or 2 CFR 910.501 Audit requirements, (f) Subrecipients and Contractors).

3. A subaward may be provided through any legal agreement, including an agreement that the Recipient or a subrecipient considers a contract.

iv. Subrecipient means an entity that:

1. Receives a subaward from the Recipient under this award; and

2. Is accountable to the Recipient for the use of the federal funds provided by the subaward.

v. Total compensation means the cash and noncash dollar value earned by the Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

21 executive during the recipient's or subrecipient's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

1. Salary and bonus.

2. Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

3. Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives and are available generally to all salaried employees.

4. Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

5. Above-market earnings on deferred compensation which is not tax- qualified.

6. Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perequisites or property) for the executive exceeds $10,000.

Term 35. System for Award Management and Universal Identifier Requirements

A. Requirement for Registration in the System for Award Management (SAM) Unless the Recipient is exempted from this requirement under 2 CFR 25.110, the Recipient must maintain the currency of its information in SAM until the Recipient submits the final financial report required under this Award or receive the final payment, whichever is later. This requires that the Recipient reviews and updates the information at least annually after the initial registration, and more frequently if required by changes in its information or another award term.

B. Unique Entity Identifier (UEI)
SAM automatically assigns a UEI to all active SAM.gov registered entities. Entities no longer have to go to a third-party website to obtain their identifier. This information Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

22 is displayed on SAM.gov.

If the Recipient is authorized to make subawards under this Award, the Recipient:

i. Must notify potential subrecipients that no entity (see definition in paragraph C of this award term) may receive a subaward from the Recipient unless the entity has provided its UEI number to the Recipient.

ii. May not make a subaward to an entity unless the entity has provided its UEI number to the Recipient.

C. Definitions
For purposes of this award term:

i. System for Award Management (SAM) means the Federal repository into which an entity must provide information required for the conduct of business as a recipient. Additional information about registration procedures may be found at the SAM Internet site (currently at https://www.sam.gov).

ii. Unique Entity Identifier (UEI) is the 12-character, alpha-numeric identifier that will be assigned by SAM.gov upon registration.

iii. Entity, as it is used in this award term, means all of the following, as defined at 2 CFR Part 25, subpart C:

1. A Governmental organization, which is a State, local government, or Indian Tribe.

2. A foreign public entity.

3. A domestic or foreign nonprofit organization.

4. A domestic or foreign for-profit organization.

5. A Federal agency, but only as a subrecipient under an award or subaward to a non-Federal entity.

iv. Subaward:

1. This term means a legal instrument to provide support for the performance of any portion of the substantive project or program for which the Recipient received this Award and that the Recipient awards to an eligible subrecipient.

2. The term does not include the Recipient’s procurement of property Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

23 and services needed to carry out the project or program (for further explanation, see 2 CFR 200.501 Audit requirements, (f) Subrecipients and Contractors and/or 2 CFR 910.501 Audit requirements, (f) Subrecipients and Contractors).

3. A subaward may be provided through any legal agreement, including an agreement that the Recipient considers a contract.

v. Subrecipient means an entity that:

1. Receives a subaward from the Recipient under this Award; and

2. Is accountable to the Recipient for the use of the Federal funds provided by the subaward.

Term 36. Nondisclosure and Confidentiality Agreements Assurances

A. By entering into this agreement, the Recipient attests that it does not and will not require its employees or contractors to sign internal nondisclosure or confidentiality agreements or statements prohibiting or otherwise restricting its employees or contactors from lawfully reporting waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

B. The Recipient further attests that it does not and will not use any Federal funds to implement or enforce any nondisclosure and/or confidentiality policy, form, or agreement it uses unless it contains the following provisions:

i. ‘‘These provisions are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created by existing statute or Executive order relating to (1) classified information, (2) communications to Congress, (3) the reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement, a gross waste of funds, an abuse of authority, or a substantial and specific danger to public health or safety, or (4) any other whistleblower protection. The definitions, requirements, obligations, rights, sanctions, and liabilities created by controlling Executive orders and statutory provisions are incorporated into this agreement and are controlling.’’

ii. The limitation above shall not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

24 Notwithstanding provision listed in paragraph (a), a nondisclosure or confidentiality policy form or agreement that is to be executed by a person connected with the conduct of an intelligence or intelligence-related activity, other than an employee or officer of the United States Government, may contain provisions appropriate to the particular activity for which such document is to be used. Such form or agreement shall, at a minimum, require that the person will not disclose any classified information received in the course of such activity unless specifically authorized to do so by the United States Government. Such nondisclosure or confidentiality forms shall also make it clear that they do not bar disclosures to Congress, or to an authorized official of an executive agency or the Department of Justice, that are essential to reporting a substantial violation of law.

Term 37. Subrecipient Change Notification
Except for subrecipients specifically proposed as part of the Recipient’s Application for award, the Recipient must notify the Contracting Officer and Project Manager in writing 30 days prior to the execution of new or modified subrecipient agreements, including naming any To Be Determined subrecipients. This notification does not constitute a waiver of the prior approval requirements outlined in 2 CFR part 200 as amended by 2 CFR part 910, nor does it relieve the Recipient from its obligation to comply with applicable Federal statutes, regulations, and executive orders.

In order to satisfy this notification requirement, the Recipient documentation must, as a minimum, include the following:

 A description of the research to be performed, the service to be provided, or the equipment to be purchased.
 Cost share commitment letter if the subrecipient is providing cost share to the Award.  An assurance that the process undertaken by the Recipient to solicit the subrecipient complies with their written procurement procedures as outlined in 2 CFR 200.317 through 200.327.
 An assurance that no planned, actual or apparent conflict of interest exists between the Recipient and the selected subrecipient and that the Recipient’s written standards of conduct were followed.1

1 It is DOE’s position that the existence of a “covered relationship” as defined in 5 CFR 2635.502(a)&(b) between a member of the Recipient’s owners or senior management and a member of a subrecipient’s owners or senior management creates at a minimum an apparent conflict of interest that would require the Recipient to notify the Contracting Officer and provide detailed information and justification (including, for example, mitigation measures) as to why the subrecipient agreement does not create an actual conflict of interest. The Recipient must also notify the Contracting Officer of any new subrecipient agreement with: (1) an entity that is owned or otherwise controlled by the Recipient; or (2) an entity that is owned or otherwise controlled by another entity that also owns or otherwise controls the Recipient, as it is DOE’s position that these situations also create at a minimum an apparent conflict of interest.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

25  A completed Environmental Questionnaire, if applicable.  An assurance that the subrecipient is not a debarred or suspended entity.  An assurance that all required award provisions will be flowed down in the resulting subrecipient agreement.

The Recipient is responsible for making a final determination to award or modify subrecipient agreements under this agreement, but the Recipient may not proceed with the subrecipient agreement until the Contracting Officer determines, and provides the Recipient written notification, that the information provided is adequate.

Should the Recipient not receive a written notification of adequacy from the Contracting Officer within 30 days of the submission of the subrecipient documentation stipulated above, the Recipient may proceed to award or modify the proposed subrecipient agreement.

Term 38. Conference Spending
The Recipient shall not expend any funds on a conference not directly and programmatically related to the purpose for which the grant was awarded that would defray the cost to the United States Government of a conference held by any Executive branch department, agency, board, commission, or office for which the cost to the United States Government would otherwise exceed $20,000, thereby circumventing the required notification by the head of any such Executive Branch department, agency, board, commission, or office to the Inspector General (or senior ethics official for any entity without an Inspector General), of the date, location, and number of employees attending such conference.

Term 39. Recipient Integrity and Performance Matters
A. General Reporting Requirement
If the total value of your currently active Financial Assistance awards, grants, and procurement contracts from all Federal awarding agencies exceeds $10,000,000 for any period of time during the period of performance of this Federal award, then you as the recipient during that period of time must maintain the currency of information reported to the System for Award Management (SAM) that is made available in the designated integrity and performance system (currently the Federal Awardee Performance and Integrity Information System (FAPIIS)) about civil, criminal, or administrative proceedings described in paragraph 2 of this term. This is a statutory requirement under section 872 of Public Law 110-417, as amended (41 U.S.C. 2313). As required by section 3010 of Public Law 111-212, all information posted in the designated integrity and performance system on or after April 15, 2011, except past performance reviews required for Federal procurement contracts, will be publicly available.

B. Proceedings About Which You Must Report
Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

26 Submit the information required about each proceeding that:
i. Is in connection with the award or performance of a Financial Assistance, cooperative agreement, or procurement contract from the Federal Government;
ii. Reached its final disposition during the most recent five-year period; and iii. Is one of the following:

1. A criminal proceeding that resulted in a conviction, as defined in paragraph E of this award term and condition;

2. A civil proceeding that resulted in a finding of fault and liability and payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more;

3. An administrative proceeding, as defined in paragraph E of this term, that resulted in a finding of fault and liability and your payment of either a monetary fine or penalty of $5,000 or more or
reimbursement, restitution, or damages in excess of $100,000; or

4. Any other criminal, civil, or administrative proceeding if:
a. It could have led to an outcome described in paragraph B.iii.1, 2, or 3 of this term;
b. It had a different disposition arrived at by consent or compromise with an acknowledgment of fault on your part; and
c. The requirement in this term to disclose information about the proceeding does not conflict with applicable laws and regulations.

C. Reporting Procedures
Enter in the SAM Entity Management area the information that SAM requires about each proceeding described in paragraph B of this term. You do not need to submit the information a second time under assistance awards that you received if you already provided the information through SAM because you were required to do so under Federal procurement contracts that you were awarded.

D. Reporting Frequency
During any period of time when you are subject to the requirement in paragraph A of this term, you must report proceedings information through SAM for the most recent five-year period, either to report new information about any proceeding(s) that you have not reported previously or affirm that there is no new information to report. Recipients that have Federal contract, Financial Assistance awards, (including cooperative agreement awards) with a cumulative total value greater than $10,000,000, must disclose semiannually any information about the criminal, civil, and administrative proceedings.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

27 E. Definitions
For purposes of this term:
i. Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative proceedings, Civilian Board of Contract Appeals proceedings, and Armed Services Board of Contract Appeals proceedings). This includes proceedings at the Federal and State level but only in connection with performance of a Federal contract or Financial Assistance awards. It does not include audits, site visits, corrective plans, or inspection of deliverables.
ii. Conviction means a judgment or conviction of a criminal offense by any court of competent jurisdiction, whether entered upon a verdict or a plea, and includes a conviction entered upon a plea of nolo contendere. iii. Total value of currently active Financial Assistance awards, cooperative agreements and procurement contracts includes—

1. Only the Federal share of the funding under any Federal award with a recipient cost share or match; and

2. The value of all expected funding increments under a Federal award and options, even if not yet exercised.

Term 40. Export Control
The United States government regulates the transfer of information, commodities, technology, and software considered to be strategically important to the U.S. to protect national security, foreign policy, and economic interests without imposing undue regulatory burdens on legitimate international trade. There is a network of Federal agencies and regulations that govern exports that are collectively referred to as “Export Controls.” The Recipient is responsible for ensuring compliance with all applicable United States Export Control laws and regulations relating to any work performed under a resulting award.

The Recipient must immediately report to DOE any export control violations related to the project funded under this award, at the recipient or subrecipient level, and provide the corrective action(s) to prevent future violations.

Term 41. Interim Conflict of Interest Policy for Financial Assistance The DOE interim Conflict of Interest Policy for Financial Assistance (COI Policy) can be found at https://www.energy.gov/management/department-energy-interim-conflict-interest-policy- requirements-financial-assistance. This policy is applicable to all non-federal entities applying for, or that receive, DOE funding by means of a financial assistance award (e.g., a grant, cooperative agreement, or technology investment agreement) and, through the implementation of this policy by the entity, to each Investigator who is planning to participate in, or is participating in, the project funded wholly or in part under this Award. The term Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

28 “Investigator” means the PI and any other person, regardless of title or position, who is responsible for the purpose, design, conduct, or reporting of a project funded by DOE or proposed for funding by DOE.

The Recipient must flow down the requirements of the interim COI Policy to any subrecipient non-federal entities, with the exception of DOE National Laboratories. Further, the Recipient must identify all financial conflicts of interests (FCOI), i.e., managed and unmanaged/unmanageable, in its initial and ongoing FCOI reports.

Prior to award, the Recipient was required to: 1) ensure all Investigators on this Award completed their significant financial disclosures; 2) review the disclosures; 3) determine whether a FCOI exists; 4) develop and implement a management plan for FCOIs; and 5) provide DOE with an initial FCOI report that includes all FCOIs (i.e., managed and unmanaged/unmanageable). Within 180 days of the date of the Award, the Recipient must be in full compliance with the other requirements set forth in DOE’s interim COI Policy.

Term 42. Organizational Conflict of Interest
Organizational conflicts of interest are those where, because of relationships with a parent company, affiliate, or subsidiary organization, the Recipient is unable or appears to be unable to be impartial in conducting procurement action involving a related organization (2 CFR 200.318(c)(2)).

The Recipient must disclose in writing any potential or actual organizational conflict of interest to the DOE Contracting Officer. The Recipient must provide the disclosure prior to engaging in a procurement or transaction using project funds with a parent, affiliate, or subsidiary organization that is not a state, local government, or Indian tribe. For a list of the information that must be included the disclosure, see Section VI. of the DOE interim Conflict of Interest Policy for Financial Assistance at https://www.energy.gov/management/department-energy- interim-conflict-interest-policy-requirements-financial-assistance.

If the effects of the potential or actual organizational conflict of interest cannot be avoided, neutralized, or mitigated, the Recipient must procure goods and services from other sources when using project funds. Otherwise, DOE may terminate the Award in accordance with 2 CFR 200.340 unless continued performance is determined to be in the best interest of the Federal government.

The Recipient must flow down the requirements of the interim COI Policy to any subrecipient non-Federal entities, with the exception of DOE National Laboratories. The Recipient is responsible for ensuring subrecipient compliance with this term.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

29 If the Recipient has a parent, affiliate, or subsidiary organization that is not a state, local government, or Indian tribe, the Recipient must maintain written standards of conduct covering organizational conflicts of interest.

Term 43. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment
As set forth in 2 CFR 200.216, recipients and subrecipients are prohibited from obligating or expending project funds (Federal and non-Federal funds) to:
(1) Procure or obtain;
(2) Extend or renew a contract to procure or obtain; or (3) Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. As described in Public Law 115-232, section 889, covered telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities). (i) For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities). (ii) Telecommunications or video surveillance services provided by such entities or using such equipment.
(iii) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

See Public Law 115-232, section 889 for additional information.

Term 44. Human Subjects Research
Research involving human subjects, biospecimens, or identifiable private information conducted with Department of Energy (DOE) funding is subject to the requirements of DOE Order 443.1C, Protection of Human Research Subjects, 45 CFR Part 46, Protection of Human Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

30 Subjects (subpart A which is referred to as the “Common Rule”), and 10 CFR Part 745, Protection of Human Subjects.

Federal regulation and the DOE Order require review by an Institutional Review Board (IRB) of all proposed human subjects research projects. The IRB is an interdisciplinary ethics board responsible for ensuring that the proposed research is sound and justifies the use of human subjects or their data; the potential risks to human subjects have been minimized; participation is voluntary; and clear and accurate information about the study, the benefits and risks of participating, and how individuals’ data/specimens will be protected/used, is provided to potential participants for their use in determining whether or not to participate.

The Recipient shall provide the Federal Wide Assurance number identified in item 1 below and the certification identified in item 2 below to DOE prior to initiation of any project that will involve interactions with humans in some way (e.g., through surveys); analysis of their identifiable data (e.g., demographic data and energy use over time); asking individuals to test devices, products, or materials developed through research; and/or testing of commercially available devices in buildings/homes in which humans will be present. Note: This list of examples is illustrative and not all inclusive.

No DOE funded research activity involving human subjects, biospecimens, or identifiable private information shall be conducted without:

1) A registration and a Federal Wide Assurance of compliance accepted by the Office of Human Research Protection (OHRP) in the Department of Health and Human Services; and
2) Certification that the research has been reviewed and approved by an Institutional Review Board (IRB) provided for in the assurance. IRB review may be accomplished by the awardee’s institutional IRB; by the Central DOE IRB; or if collaborating with one of the DOE national laboratories, by the DOE national laboratory IRB.

The Recipient is responsible for ensuring all subrecipients comply and for reporting information on the project annually to the DOE Human Subjects Research Database (HSRD) at https://science.osti.gov/HumanSubjects/Human-Subjects-Database/home. Note: If a DOE IRB is used, no end of year reporting will be needed.

Additional information on the DOE Human Subjects Research Program can be found at:
https://science.osti.gov/ber/human-subjects

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

31 Term 45. Fraud, Waste and Abuse
The mission of the DOE Office of Inspector General (OIG) is to strengthen the integrity, economy and efficiency of DOE’s programs and operations including deterring and detecting fraud, waste, abuse and mismanagement. The OIG accomplishes this mission primarily through investigations, audits, and inspections of Department of Energy activities to include grants, cooperative agreements, loans, and contracts. The OIG maintains a Hotline for reporting allegations of fraud, waste, abuse, or mismanagement. To report such allegations, please visit https://www.energy.gov/ig/ig-hotline.

Additionally, the Recipient must be cognizant of the requirements of 2 CFR § 200.113 Mandatory disclosures, which states:

The non-Federal entity or applicant for a Federal award must disclose, in a timely manner, in writing to the Federal awarding agency or pass-through entity all violations of Federal criminal law involving fraud, bribery, or gratuity violations potentially affecting the Federal award. Non-Federal entities that have received a Federal award including the term and condition outlined in appendix XII of 2 CFR Part 200 are required to report certain civil, criminal, or administrative proceedings to SAM (currently FAPIIS). Failure to make required disclosures can result in any of the remedies described in § 200.339. (See also 2 CFR part 180, 31 U.S.C. 3321, and 41 U.S.C. 2313.)

Term 46. Buy American Requirement for Infrastructure Projects

A. Definitions

Components are defined as the articles, materials, or supplies incorporated directly into the end manufactured product(s).

Construction Materials are an article, material, or supply—other than an item primarily of iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives—that is used in an infrastructure project and is or consists primarily of non-ferrous metals, plastic and polymer-based products (including
polyvinylchloride, composite building materials, and polymers used in fiber optic cables), glass (including optic glass), lumber, drywall, coatings (paints and stains), optical fiber, clay brick; composite building materials; or engineered wood products.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

32 Domestic Content Procurement Preference Requirement- means a requirement that no amounts made available through a program for federal financial assistance may be obligated for an infrastructure project unless—
(A) all iron and steel used in the project are produced in the United States;
(B) the manufactured products used in the project are produced in the United States; or
(C) the construction materials used in the project are produced in the United States.

Also referred to as the Buy America Requirement.

Infrastructure includes, at a minimum, the structures, facilities, and equipment located in the United States, for: roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property; and generation, transportation, and distribution of energy - including electric vehicle (EV) charging.

The term “infrastructure” should be interpreted broadly, and the definition provided above should be considered as illustrative and not exhaustive.

Manufactured Products are items used for an infrastructure project made up of components that are not primarily of iron or steel; construction materials; cement and cementitious materials’ aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.

Primarily of iron or steel means greater than 50% iron or steel, measured by cost.

Project- means the construction, alteration, maintenance, or repair of infrastructure in the United States.

Public- The Buy America Requirement does not apply to non-public infrastructure. For purposes of this guidance, infrastructure should be considered “public” if it is: (1) publicly owned or (2) privately owned but utilized primarily for a public purpose. Infrastructure should be Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

33 considered to be “utilized primarily for a public purpose” if it is privately operated on behalf of the public or is a place of public accommodation.

B. Buy America Requirement
None of the funds provided under this Award (federal share or recipient cost-share) may be used for a project for infrastructure unless:

1. All iron and steel used in the project is produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;

2. All manufactured products used in the project are produced in the United States—this means the manufactured product was
manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and

3. All construction materials are manufactured in the United States— this means that all manufacturing processes for the construction material occurred in the United States.

The Buy America Requirement only applies to articles, materials, and supplies that are consumed in, incorporated into, or permanently affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought into the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America Requirement apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

Recipients are responsible for administering their award in accordance with the terms and conditions, including the Buy America Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

34 Requirement. The recipient must ensure that the Buy America Requirement flows down to all subawards and that the subawardees and subrecipients comply with the Buy America Requirement. The Buy America Requirement term and condition must be included all sub-awards, contracts, subcontracts, and purchase orders for work performed under the infrastructure project.

C. Certification of Compliance
The Recipient must certify or provide equivalent documentation for proof of compliance that a good faith effort was made to solicit bids for domestic products used in the infrastructure project under this Award.

The Recipient must also maintain certifications or equivalent documentation for proof of compliance that those articles, materials, and supplies that are consumed in, incorporated into, affixed to, or otherwise used in the infrastructure project, not covered by a waiver or exemption, are produced in the United States. The certification or proof of compliance must be provided by the suppliers or manufacturers of the iron, steel, manufactured products and construction materials and flow up from all subawardees, contractors and contractors to the Recipient. The Recipient must keep these certifications with the award/project files and be able to produce them upon request from DOE, auditors or Office of Inspector General.

D. Waivers
When necessary, the Recipient may apply for, and DOE may grant, a waiver from the Buy America Requirement. Requests to waive the application of the Buy America Requirement must be in writing to the Contracting Officer. Waiver requests are subject to review by DOE and the Office of Management and Budget, as well as a public comment period of no less than 15 calendar days.

Waivers must be based on one of the following justifications:

1. Public Interest- Applying the Buy America Requirement would be inconsistent with the public interest;

2. Non-Availability- The types of iron, steel, manufactured products, or construction materials are not produced in the Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

35 United States in sufficient and reasonably available quantities or of a satisfactory quality; or

3. Unreasonable Cost- The inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent.

Requests to waive the Buy America Requirement must include the following:

• Waiver type (Public Interest, Non-Availability, or Unreasonable Cost);
• Recipient name and Unique Entity Identifier (UEI);
• Award information (Federal Award Identification Number, Assistance Listing number);
• A brief description of the project, its location, and the specific infrastructure involved;
• Total estimated project cost, with estimated federal share and recipient cost share breakdowns;
• Total estimated infrastructure costs, with estimated federal share and recipient cost share breakdowns;
• List and description of iron or steel item(s), manufactured goods, and/or construction material(s) the recipient seeks to waive from the Buy America Preference, including name, cost, quantity(ies), country(ies) of origin, and relevant Product Service Codes (PSC) and North American Industry Classification System (NAICS) codes for each;
• A detailed justification as to how the non-domestic item(s) is/are essential the project;
• A certification that the recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and non-proprietary communications with potential suppliers;
• A justification statement—based on one of the applicable justifications outlined above—as to why the listed items cannot be procured domestically, including the due diligence performed (e.g., market research, industry outreach, cost analysis, cost-benefit analysis) by the recipient to attempt to avoid the need for a waiver. This justification may cite, if applicable, the absence of any Buy America-compliant bids Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

36 received for domestic products in response to a solicitation; and
• Anticipated impact to the project if no waiver is issued.

The Recipient should consider using the following principles as minimum requirements contained in their waiver request:

• Time-limited: Consider a waiver constrained principally by a length of time, rather than by the specific project/award to which it applies. Waivers of this type may be appropriate, for example, when an item that is “non-available” is widely used in the project. When requesting such a waiver, the Recipient should identify a reasonable, definite time frame (e.g., no more than one to two years) designed so that the waiver is reviewed to ensure the condition for the waiver (“non-availability”) has not changed (e.g., domestic supplies have become more
available).

• Targeted: Waiver requests should apply only to the item(s), product(s), or material(s) or category(ies) of item(s), product(s), or material(s) as necessary and justified. Waivers should not be overly broad as this will undermine domestic preference policies.

• Conditional: The Recipient may request a waiver with specific conditions that support the policies of IIJA/BABA and Executive Order 14017.

DOE may request, and the Recipient must provide, additional information for consideration of this wavier. DOE may reject or grant waivers in whole or in part depending on its review, analysis, and/or feedback from OMB or the public. DOEs final determination regarding approval or rejection of the waiver request may not be appealed.

Waiver requests may take up to 90 calendar days to process.

Term 47. Affirmative Action and Pay Transparency Requirements All federally assisted construction contracts exceeding $10,000 annually will be subject to the requirements of Executive Order 11246:

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

37 (1) Recipients, subrecipients, and contractors are prohibited from discriminating in employment decisions on the basis of race, color, religion, sex, sexual orientation, gender identity or national origin.

(2) Recipients and Contractors are required to take affirmative action to ensure that equal opportunity is provided in all aspects of their employment. This includes flowing down the appropriate language to all subrecipients, contractors and subcontractors.

(3) Recipients, subrecipients, contractors and subcontractors are prohibited from taking adverse employment actions against applicants and employees for asking about, discussing, or sharing information about their pay or, under certain circumstances, the pay of their co-workers.

The Department of Labor’s (DOL) Office of Federal Contractor Compliance Programs (OFCCP) uses a neutral process to schedule contractors for compliance evaluations. OFCCP’s Technical Assistance Guide2 should be consulted to gain an understanding of the requirements and possible actions the recipients, subrecipients, contractors and subcontractors must take.

Term 48. Potentially Duplicative Funding Notice
If the Recipient or subrecipients have or receive any other award of federal funds for activities that potentially overlap with the activities funded under this Award, the Recipient must promptly notify DOE in writing of the potential overlap and state whether project funds (i.e., recipient cost share and federal funds) from any of those other federal awards have been, are being, or are to be used (in whole or in part) for one or more of the identical cost items under this Award. If there are identical cost items, the Recipient must promptly notify the DOE Contracting Officer in writing of the potential duplication and eliminate any inappropriate duplication of funding.

Term 49. Transparency of Foreign Connections
During the term of the Award, the Recipient must notify the DOE Contracting Officer within fifteen (15) business days of learning of the following circumstances in relation to the Recipient or subrecipients:

1. The existence of any joint venture or subsidiary that is based in, funded by, or has a foreign affiliation with any foreign country of risk;

2 See OFCCP’s Technical Assistance Guide at:
https://www.dol.gov/sites/dolgov/files/ofccp/Construction/files/ConstructionTAG.pdf?msclkid=9e397d68c4b111ec 9d8e6fecb6c710ec Also see the National Policy Assurances http://www.nsf.gov/awards/managing/rtc.jsp Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

38 2. Any current or pending contractual or financial obligation or other agreement specific to a business arrangement, or joint venture-like arrangement with an enterprise owned by a country of risk or foreign entity based in a country of risk;

3. Any current or pending change in ownership structure of the Recipient or subrecipients that increases foreign ownership related to a country of risk;

4. Any current or pending venture capital or institutional investment by an entity that has a general partner or individual holding a leadership role in such entity who has a foreign affiliation with any foreign country of risk;

5. Any current or pending technology licensing or intellectual property sales to a foreign country of risk; and

6. Any current or pending foreign business entity, offshore entity, or entity outside the United States related to the Recipient or subrecipient.

Term 50. Foreign Collaboration Considerations

a. Consideration of new collaborations with foreign organizations and governments.

The Recipient must provide DOE with advanced written notification of any potential collaboration with foreign entities, organizations or governments in connection with its DOE-funded award scope. The Recipient must await further guidance from DOE prior to contacting the proposed foreign entity, organization or government regarding the potential collaboration or negotiating the terms of any potential agreement.

b. Existing collaborations with foreign entities, organizations and governments. The Recipient must provide DOE with a written list of all existing foreign collaborations in which has entered in connection with its DOE-funded award scope.

c. Description of collaborations that should be reported: In general, a collaboration will involve some provision of a thing of value to, or from, the Recipient. A thing of value includes but may not be limited to all resources made available to, or from, the recipient in support of and/or related to the Award, regardless of whether or not they have monetary value. Things of value also may include in-kind contributions (such as office/laboratory space, data, equipment, supplies, employees, students).

In-kind contributions not intended for direct use on the Award but resulting in provision of a thing of value from or to the Award must also be reported.

Collaborations do not include routine workshops, conferences, use of the Recipient’s services and facilities by foreign investigators resulting from its standard published Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

39 process for evaluating requests for access, or the routine use of foreign facilities by awardee staff in accordance with the Recipient’s standard policies and procedures.

Subpart D. Award-Specific Provisions

Term 51. Reporting, Tracking and Segregation of Incurred Costs BIL funds can be used in conjunction with other funding, as necessary to complete projects, but tracking and reporting must be separate to meet the reporting requirements of the BIL and related Office of Management and Budget (OMB) Guidance. The Recipient must keep separate records for BIL funds and must ensure those records comply with the requirements of the BIL.

Term 52. Davis-Bacon Requirements
This Award is funded under Division D of the Bipartisan Infrastructure Law (BIL). All laborers and mechanics employed by the recipient, subrecipients, contractors or subcontractors in the performance of construction, alteration, or repair work in excess of $2,000 on an award funded directly by or assisted in whole or in part by funds made available under this Award shall be paid wages at rates not less than those prevailing on similar projects in the locality, as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code commonly referred to as the “Davis-Bacon Act” (DBA).

Recipients shall provide written assurance acknowledging the DBA requirements for the Award and confirming that all of the laborers and mechanics performing construction, alteration, or repair work in excess of $2,000 funded directly by or assisted in whole or in part by the Award are paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by Subchapter IV of Chapter 31 of Title 40, United States Code (Davis- Bacon Act).

The Recipient must comply with all Davis-Bacon Act requirements, including but not limited to:
(1) ensuring that the wage determination(s) and appropriate Davis-Bacon clauses and requirements are flowed down to and incorporated into any applicable subcontracts or subrecipient awards.
(2) being responsible for compliance by any subcontractor or subrecipient with the Davis-Bacon labor standards.
(3) receiving and reviewing certified weekly payrolls submitted by all subcontractors and subrecipients for accuracy and to identify potential compliance issues.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

40 (4) maintaining original certified weekly payrolls for 3 years after the completion of the project and must make those payrolls available to the DOE or the Department of Labor upon request, as required by 29 CFR 5.6(a)(2). (5) conducting payroll and job-site reviews for construction work, including interviews with employees, with such frequency as may be necessary to assure compliance by its subcontractors and subrecipients and as requested or directed by the DOE.
(6) cooperating with any authorized representative of the Department of Labor in their inspection of records, interviews with employees, and other actions undertaken as part of a Department of Labor investigation. (7) posting in a prominent and accessible place the wage determination(s) and Department of Labor Publication: WH-1321, Notice to Employees Working on Federal or Federally Assisted Construction Projects.
(8) notifying the Contracting Officer of all labor standards issues, including all complaints regarding incorrect payment of prevailing wages and/or fringe benefits, received from the recipient, subrecipient, contractor, or subcontractor employees; significant labor standards violations, as defined in 29 CFR 5.7; disputes concerning labor standards pursuant to 29 CFR parts 4, 6, and 8 and as defined in FAR 52.222-14; disputed labor standards determinations; Department of Labor investigations; or legal or judicial proceedings related to the labor standards under this Contract, a subcontract, or subrecipient award. (9) preparing and submitting to the Contracting Officer, the Office of Management and Budget Control Number 1910-5165, Davis Bacon Semi-Annual Labor Compliance Report, by April 21 and October 21 of each year. Form submittal will be administered through the iBenefits system (https://doeibenefits2.energy.gov) or its successor system.

The Recipient must complete Davis-Bacon Act compliance training and must maintain competency in Davis-Bacon Act compliance. The Contracting Officer will notify the Recipient of any DOE sponsored Davis-Bacon Act compliance trainings. The Department of Labor offers free Prevailing Wage Seminars several times a year that meet this requirement, at https://www.dol.gov/agencies/whd/government-contracts/construction/seminars/events.

The Department of Energy has contracted with, a third-party DBA electronic payroll compliance software application. Once operable, the Recipient must ensure the timely electronic submission of weekly certified payrolls as part of its compliance with the Davis-Bacon Act unless a waiver is granted to the Recipient or a particular contractor or subcontractor because they are unable or limited in their ability to use or access the software.

Award No. DE-SE0000418.0000 With Oakland
Special Terms and Conditions

41 Davis Bacon Act Electronic Certified Payroll Submission Waiver A waiver must be granted before the Award starts. The applicant does not have the right to appeal DOE’s decision concerning a waiver request.

For additional guidance on how to comply with the Davis-Bacon provisions and clauses, see https://www.dol.gov/agencies/whd/government-contracts/construction and https://www.dol.gov/agencies/whd/government-contracts/protections-for-workers-in- construction.

Term 53. Signage
The Recipient is encouraged to display DOE standard infrastructure investment signage, available for download from DOE (https://www.energy.gov/branding), during construction of the project. Expenditures for such signage shall be a permitted eligible cost of the project.