Update Supplemental Environmental Impact Report in conjunction with File No. PGPA20- 002 (City Council Resolution No. 2022-129).

On September 27, 2024, the Applicant submitted an application for a Specific Plan (File No. PSP24-003), which will establish land use designations, development standards, and design guidelines for 189 acres of land generally bounded by Walker Avenue to the east, Campus Avenue to the west, Eucalyptus Avenue to the south and Ontario Ranch Road to the north. The Specific Plan will outline the potential development of 2,939,000 square feet of business park development, 10,000 square feet of commercial development within the Business Park land use to support the Business Park operations, a potential 35,000 square foot publicly operated animal resource center and approximately 37- acres of open space. A Planning Commission recommendation of approval to the City Council is requested for the Specific Plan. Approval of the Specific Plan is subject to the approval and certification of File No. PGPA25-002, an amendment to The Ontario Policy Plan Supplemental Environmental Impact Report (SEIR) (State Clearinghouse No. 2025110102), which includes the adoption of a Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations.

PROJECT SETTING: The Project site is within the SP (Specific Plan) and AG (Agricultural Overlay) zoning districts and is currently used for farming/agriculture and dairy farm purposes. The site is made up of eighteen separate parcels comprising approximately 189-acres of land generally bounded by Walker Avenue to the east, Campus Avenue to the west, Eucalyptus Avenues to the south and Ontario Ranch Road to the north, see Exhibit A: Project Location Map, attached. The existing surrounding land uses, zoning, and Policy Plan (general plan) and specific plan land use designations are summarized in Table 1: Surrounding Zoning & Land Uses (see Technical Appendix).

PROJECT ANALYSIS:
(1) Specific Plan — The Eucalyptus Business Park Specific Plan (EBPSP) will provide regulatory requirements to ensure future development of the EBPSP implements the goals and vision of the City’s Policy Plan. The EBPSP will generally include development standards and design guidelines, circulation requirements, infrastructure and phasing requirements, permitted land uses, implementation guidelines, development review and approval procedures, among others. Through these requirements and procedures, the EBPSP will ensure a well-balanced, high quality business park complex is achieved and established in a manner that will facilitate a range of uses as envisioned by The Ontario Plan. The primary components of the EBPSP are described and analyzed further below. (a) Land Use Plan – The land use plan for the EBPSP primarily consists of a range of business park uses and open space land uses, while also accommodating commercial retail uses to support the business park development, future businesses, and their employees.
4928
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 3 of 25 ends

The proposed land use plan is separated into nine (9) proposed Planning Areas (PA) across the two main land use categories – Business Park (PA 1-6), and Open Space (PA 7-9) (See Exhibit B: Eucalyptus Business Park Specific Plan Land Use Map).

Business Park - The TOP identifies a maximum buildout intensity 0.60 for Business Park land uses. This intensity, also referred to as Floor Area Ratio (FAR) is intended to guide the size of business park buildings in effort to attract and/or accommodate a different spectrum of business park uses. The EBPSP is proposing a maximum intensity/FAR of 0.55, which is consistent with TOP and slightly less than the TOP maximum. The FAR for EBPSP was intentionally lowered to ensure future business park development is scaled and designed appropriately in consideration of the proximity to Grand Park.

The Specific Plan, Business Park Planning Areas are envisioned to be developed as outlined below:
• Planning Area 1, located along the upper western portion of the Specific Plan, is 7.70- acres in size and can potentially accommodate up to 162,600 square feet of business park development.
• Planning Area 2, located along the center of the Specific Plan, is 18.33-acres in size and can potentially accommodate up to 273,700 square feet of business park development.
• Planning Area 3, located along the east side of the Specific Plan, is 18.21-acres in size and can potentially accommodate up to 340,700 square feet of business park development.
• Planning Area 4, located along the southwest corner of the Specific Plan, is 18.19- acres in size and can potentially accommodate up to 423,200 square feet of business park development.
• Planning Area 5, located along the center of the Specific Plan; is 37.76-acres in size and can potentially accommodate up to 859,300 square feet of business park development.
• Planning Area 6, located along the southeast corner of the Specific Plan, is 37.71 acres in size and can potentially accommodate up to 879,500 square feet of business park development.
• Planning Area 7 through 9, located along the north boundary of the Specific Plan, is roughly 37 acres total and will remain as open space as part of the Grand Park Master Plan.

Open Space – Parkland – Grand Park extends east from Campus Avenue to Haven Avenue. This Specific Plan will be located immediately to the south of the Grand Park, 4929
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 4 of 25 ends

between Campus Avenue, to the west and Walker Avenue, to the east. The design, construction, and programming of Grand Park is regulated by the Grand Park Master Plan and all future improvements must be consistent with the Grand Park Master Plan.

The EBPSP will provide permitted uses within the Open Space Parkland designation, which includes portions of Grand Park, however, future design and use of the park space will require separate reviews and collaboration with the City to ensure the Grand Park Master Plan vision is maintained.

Additionally, the EBPSP will also allow up to 10,000 square feet of commercial/retail uses to help support the future business park businesses and employees within those businesses. The commercial uses do not include a dedicated “commercial/retail” land use designation; these uses will instead be allowed within any of Business Park PAs. This will allow flexibility with the placement of the commercial uses either as stand-alone developments or integrated into a business park building. (b) Development Standards and Design Guidelines — The Development Standards and Design Guidelines will provide the tools to develop a cohesive business park complex that blends form and function. Within the Business Park PAs, future development will be regulated by development standards that generally include setback and separation requirements, maximum heights, maximum sizes, parking requirements, specific landscape requirements, among others. These standards will ensure buildings are appropriately scaled within their respective PA and positioned in a manner that contributes to the overall Business Park development. Notable standards include appropriate setbacks from major and minor/private streets, appropriate landscape buffers along the perimeter of streets and buildings, proper screening of parking and truck yard where necessary, among others, all of which are intended for business park buildings.

The Design Guidelines have been established to implement the intent and vision of the Ontario Development Code and The Ontario Plan (TOP). The Design Guidelines will provide assurance that the EBPSP will produce high quality design and character in a consistent manner. The Design Guidelines will also provide appropriate direction and clarity for future developers, which helps minimize conflict and inconsistencies with the EBPSP’s intent.

The EBPSP will contain a Contemporary design theme. Each building will be required to incorporate an appropriate balance of colors and materials, including the use of architectural features and elements to further enhance the design. This is generally achieved with the use of substantial glazing at the office areas or as spandrel glass throughout building elevations. Additional features such as awnings, canopies, and decorative lighting will also be required, as well as accent materials such as metal, stone, or similar. The following details help further emphasize the EBPSP design guidelines:
• Buildings are characterized by simple and distinct cubic masses with interlocking volumes of wall planes, colors, and materials to create visual appeal. 4930
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 5 of 25 ends

• Building massing, scale and roof forms will be the primary design components requiring articulation in their architectural expression as they relate to the public views. • The business park, commercial land uses will maintain consideration of the pedestrian realm and will implement appropriate site planning and architectural design • Theme walls/entry monuments may be installed at the major project entries at the discretion of the builder/project developer and subject to the approval of a master sign program by the City.
• The site design will facilitate the intended functions of common space areas and will provide for appropriate interactions between buildings and activity areas, goods movement, vehicular access/parking, and pedestrian and bicycle travel. • The buildings will be oriented to define the street scene and provide for an aesthetically pleasing streetscape; and
(c) Circulation — The circulation plan for the Specific Plan reinforces the objective of moving vehicles, pedestrians, cyclists, and public transit safely and efficiently throughout and around the project area. The Specific Plan establishes the hierarchy and general location of roadways within the EBPSP. The Project provides efficient circulation for vehicle traffic and a safe environment for pedestrian movement. Primary access to the project will be provided along Eucalyptus and Grove Avenue as well as a new public street ‘A’, that will be developed along the northern portion of the Specific Plan.

The new public street will separate the Business Park land use from the Open Space land use (Grand Park). The new public street ‘A’ will be a 64-foot-wide (collector roadway) with two lanes in each direction. While the street serves as additional circulation, it will also include enhanced design and landscape features to help strengthen the interaction between the Business Park buildings and the Grand Park.

Additional circulation within the Specific Plan will be provided and improved as follows:
• Eucalyptus Avenue is designed to be a four 4-lane (108’) collector road (truck route), with a 14-foot wide striped median, consistent with the TOP. • Campus Avenue is designed to be a 4-lane (108’) minor arterial road with a 14’ striped median, consistent with the TOP.
• Bon View Avenue is designed to be 4-lane (66’) collector road, consistent with the TOP.
• Grove Avenue is designed to be 4-lanes (124’) principal arterial road, with a 28’ wide raised landscape median, consistent with the TOP; and 4931
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 6 of 25 ends

• Walker Avenue is designed to be 2-lane (88’) collector road (truck route), consistent with the TOP.

The Specific Plan has been designed to feature four (4) signalized intersections along Eucalyptus Avenue and four (4) along the new public street ‘A’. Each street will include a parkway, sidewalk, and a landscape buffer. Right-of-way improvements along the streets will be consistent with the City’s Master Plan of Streets. (d) Landscaping Design — The landscape design theme for the EBPSP encourages landscaping and designs that enhance the street appeal of the structures, create and define public and private spaces, and provide shade that benefits the environment. A plant palette (Table 6-1) of the Specific Plan outlines the plant materials and trees to be used in parking lots, street parkways, and adjacent to buildings. The plant palette includes evergreen and deciduous trees, shrubs and ground covers, and grasses that are commonly used throughout Southern California. Many of the plants are waterefficient species native also to Southern California. The overall landscape design of the Specific Plan was organized to help define the landscape principles for the Specific Plan, with specific treatment along the streets establishing the general framework for the area.

Landscape also plays a vital role in the streetscape design. Landscape design guidelines will help establish a hierarchy for landscape development along the surrounding roadways, as well as establishing a framework for consistency throughout the design. The streetscapes for the roads include formal landscape parkway designs, neighborhood edges, and landscape medians. The EBPSP will apply the following streetscape requirements along the major roadways:
• Eucalyptus Avenue: Will be required to provide a 35-foot neighborhood edge that will include a 15-foot-wide landscape buffer, 8-foot-wide multi-purpose trail, 5-foot-wide sidewalk and a 7-foot-wide landscape parkway.
• Campus Avenue: Will be required to provide a 35-foot-wide neighborhood edge that will include a 15-foot-wide landscape setback, 8-foot-wide multi-purpose trail, 5-footwide sidewalk and a 7-foot-wide landscape parkway. • Grove Avenue: Will be required to provide a 40-foot-wide landscape neighborhood edge that will include a 15-foot-wide landscape buffer, 8-foot-wide multi-purpose trail, a 5-foot-wide landscape buffer, a 5-foot-wide sidewalk and a 7-foot-wide landscape parkway.
• Walker Avenue: Will be required to provide 35-foot-wide neighborhood edge that will include a 7-foot-wide parkway, 5-foot-wide sidewalk, 8-foot-wide multi-purpose trail and 15-foot-wide landscape buffer.
4932
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 7 of 25 ends

• Bon View Avenue: Will be required to provide a 29-foot-wide neighborhood edge that will include a 4-foot-wide parkway, 5-foot-wide sidewalk and 20-foot-wide landscape buffer.
• New Public Street ‘A’: Will require a 7-foot-wide landscape parkway and a 5-footwide sidewalk and will provide a 20-foot landscape setback along the south side of the street, measured from the back of the sidewalk. While Public Street ‘A’ does not include an actual neighborhood edge, the EBPSP has incorporated the additional 20- foot landscape setback to ensure appropriate streetscape design and aesthetic landscape buffers are provided near the Grand Park.
(e) Infrastructure and Services — The backbone infrastructure to serve all areas of the Specific Plan will be installed by the developers in accordance with the Ontario Ranch Master Plan for streets, water (including recycled water), sewer, storm drain, and fiber optic facilities. Natural gas will be provided by Southern California Gas Company and electricity by Southern California Edison (“SCE”). Development of the Project requires the installation by the developer of all infrastructure necessary to serve the Project as a standalone development.
(f) Specific Plan Phasing — The phasing of development within the Specific Plan will be determined by the various developers, development agreements, and based upon the market conditions. It is anticipated that the Specific Plan will be developed in six (6) phases (see Attachment E: Proposed Phasing Plan). The proposed phases are as follows:
• Phase A: Will include Planning Area (PA) 3 and 6
• Phase B: Will include Planning Area (PA) 2 and 5
• Phase C: Will include Planning Area (PA) 1 and 4
• Phase D: Will include Planning Area (PA) 9
• Phase E: Will include Planning Area (PA) 8; and
• Phase F: Will include Planning Area (PA) 7
The developer(s) and the city will work together to ensure that the open space-parkland areas are developed concurrently with the build-out of the business park portions of the Specific Plan. The final details will be outlined in the development agreement(s) when the first subdivision map is processed and approved by the City. (g) Signage — All future signage will be subject to review and approval of a comprehensive sign program for the Specific Plan. A sign program will facilitate the integration of the signs within the overall site and building design to create a unified visual statement and provide for flexible application of sign regulations in the design and display of multiple signs. Key provisions will include entry monument, center and tenant identification signage, traffic and wayfinding signs, building signs, secondary monumentation, and visitor and directional signage. Prior to the issuance of a Building 4933
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 8 of 25 ends

Permit for the installation of any new sign, the Applicant is required to submit Sign Plans for Planning Department review and approval.

PUBLIC NOTIFICATION: The subject application was advertised as a public hearing in at least one newspaper of general circulation in the City of Ontario (the Inland Valley Daily Bulletin newspaper). In addition, notices were mailed to all owners of real property located within a minimum of 600 feet of the exterior boundaries of the Project site that is the subject of the hearing, as shown on the records of the County Assessor.

CORRESPONDENCE: As of the preparation of this Agenda Report, Planning Department staff have not received written or verbal communication in objection to the Project.

AGENCY/DEPARTMENT REVIEWS: Each City agency/department has been provided the opportunity to review and comment on the subject application and recommend conditions of approval to be imposed upon the application. At the time of the Resolution preparation, recommended conditions of approval were provided and are appended to the attached Resolutions as "Attachment A."
AIRPORT LAND USE COMPATIBILITY PLAN (ALUCP) COMPLIANCE: The California State Aeronautics Act (Public Utilities Code Section 21670 et seq.) requires that an Airport Land Use Compatibility Plan be prepared for all public use airports in the State; and requires that local land use plans and individual development proposals must be consistent with the policies set forth in the adopted Airport Land Use Compatibility Plan.

On April 19, 2011, the City Council of the City of Ontario approved and adopted the ONT ALUCP, establishing the Airport Influence Area for Ontario International Airport, which encompasses lands within parts of San Bernardino, Riverside, and Los Angeles Counties, and limits future land uses and development within the Airport Influence Area, as they relate to noise, safety, airspace protection, and overflight impacts of current and future airport activity. As the recommending body for the Project, File No. PSP24-003, the Planning Commission has reviewed and considered the facts and information contained in the Application and supporting documentation against the ONT ALUCP compatibility factors, including [1] Safety Criteria (ONT ALUCP Table 2-2) and Safety Zones (ONT ALUCP Map 2-2), [2] Noise Criteria (ONT ALUCP Table 2-3) and Noise Impact Zones (ONT ALUCP Map 2-3), [3] Airspace protection Zones (ONT ALUCP Map 2-4), and [4] Overflight Notification Zones (ONT ALUCP Map 2-5). As a result, the Planning Commission, therefore, finds and determines that the Project, File No. PSP24-003, when implemented in conjunction with the conditions of approval, will be consistent with the policies and criteria set forth within the ONT ALUCP.

On August 2, 2022, the City Council of the City of Ontario approved and adopted a Development Code Amendment to establish the Chino Airport ("CNO") Overlay Zoning District ("OZD") and Reference I, Chino Airport Land Use Compatibility Plan ("CNO ALUCP"). The CNO OZD and CNO ALUCP established the Airport Influence Area for Chino Airport, solely within the City of Ontario, and limits future land uses and development 4934
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 9 of 25 ends

within the Airport Influence Area, as they relate to safety, airspace protection, and overflight impacts of current and future airport activity. The CNO ALUCP is consistent with policies and criteria set forth within the Caltrans 2011 California Airport Land Use Planning Handbook. The Specific Plan is located within Safety Zones 4 and 6 of the Chino ALUCP and may have additional development restrictions that include building heights, land use restrictions, Floor Area Ratio (FAR) limitations and Open Land Criteria. Refer to the Chino ALUCP for additional development regulations. Any future development in the project area shall be consistent with the policies and criteria of the ONT and Chino ALUCP.

COMPLIANCE WITH THE ONTARIO PLAN: The proposed Project is consistent with the principles, goals and policies contained within the Vision, Governance, Policy Plan (General Plan), and City Council Priorities components of The Ontario Plan (TOP).

California Government Code (Title 7, Division 1, Chapter 3, Article 8, Section 65450-65457) permits the adoption and administration of specific plans as an implementation tool for elements contained in the local general plan. Specific plans must demonstrate consistency in regulations, guidelines, and programs with the goals and policies set forth in the general plan. The EBPSP has been prepared in conformance with the goals and policies of the City of Ontario Policy Plan (TOP) (General Plan). More specifically, the goals and policies of TOP that are furthered by the proposed Project are as follows:
(1) City Council Goals
• Invest in the Growth and Evolution of the City's Economy • Operate in a Businesslike Manner
• Invest in the City's Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
• Ensure the Development of a Well Planned, Balanced, and Self-Sustaining Community in Ontario Ranch
(2) Vision
Distinctive Development that integrates our varied and diverse focal points, districts, centers, corridors, and neighborhoods to provide a feeling of coherence without sacrificing uniqueness.

Commercial and Residential Development
• Development quality that is broadly recognized as distinctive and not exclusively tied to the general suburban character typical of much of Southern California.
• A system of vibrant retail, town, and neighborhood centers responsive to market demands and woven into the fabric of the community. 4935
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 10 of 25 ends

• Distinctive and well-maintained neighborhoods that offer exceptional variety in lifestyles, with convenient access to schools, recreation and cultural facilities, places of worship, places of employment and shopping.

Development Quality
• Unique and authentic districts, centers, and corridors of varied scales that establish Ontario as one of the most vital and diverse locales in Southern California.
• Superior quality and design of the built environment and open spaces through careful attention to detail at every scale, including public and private spaces and structures.
(3) Governance
Decision Making
Goal G1: Sustained decision-making that consistently moves Ontario towards its Vision by using The Ontario Plan as a framework for assessing choices. • G1-1 Consistency with Policies. We require that staff recommendations to the City Council be consistent with adopted City Council Priorities (Goals and Objectives) and The Policy Pan.
• G1-2 Long-term Benefit. We require decisions to demonstrate and document how they add value to the community and support the Ontario Vision.
(4) Policy Plan (General Plan)
Land Use Element
Goal LU-1 Balance: A community that has a spectrum of housing types and price ranges that match the jobs in the City and that make it possible for people to live and work in Ontario and maintain a quality of life.
• LU-1.1 Strategic Growth. We concentrate growth in strategic locations that help create place and identity, maximize available and planned infrastructure, foster the development of transit, and support the expansion of the active and multimodal transportation networks throughout the City. • LU-1.6 Complete Community. We incorporate a variety of land uses and building types in our land use planning efforts that result in a complete community where residents at all stages of life, employers, workers, and 4936
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 11 of 25 ends

visitors have a wide spectrum of choices of where they can live, work, shop and recreate within Ontario.

Goal LU-2 Compatibility: Compatibility between a wide range of uses and a resultant urban patterns and forms.
• LU-2.1 Land Use Decisions. We minimize adverse impacts on adjacent properties when considering land use and zoning requests. • LU-2.2 Buffers. We require new uses to provide mitigation or buffers between existing uses where potential adverse impacts could occur. Additional mitigation is required when new uses could negatively impact environmental justice areas.
• LU-2.5 Regulation of Uses. We regulate the location, concentration, and operation of uses that have impacts on surrounding land uses. • LU-2.11 Context-Aware Transitions and Connections. We require new development projects and land-planning efforts to provide context-aware and appropriate transitions and connections between existing and planned neighborhoods, blocks, sites, and buildings.

Goal LU-3 Flexibility: Staff, regulations and processes that support and allow flexible response to conditions and circumstances in order to achieve the Vision. • LU-3.1 Development Standards. We maintain clear development standards which allow flexibility to achieve our Vision and provide objective standards that ensure predictability and deliver the intended physical outcomes. • LU-3.3 Land Use Flexibility. We consider uses not typically permitted within a land use category if doing so improves livability, reduces vehicular trips, creates community gathering places and activity nodes, and helps create identity.

Community Economics Element:

Goal CE-1 Complete Community: A complete community that provides for all incomes and stages of life.
• CE-1.1 Jobs-Housing Balance. We pursue improvement to the Inland Empire’s balance between jobs and housing by promoting job growth that reduces the regional economy’s reliance on out-commuting. 4937
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 12 of 25 ends

• CE-1.5 Business Attraction. We proactively attract new and expanding businesses to Ontario in order to increase the City’s share of growing sectors of the regional and global economy.

Goal CE-2 Placemaking: A City of distinctive neighborhoods, districts, corridors, and centers where people choose to be.
• CE-2.1Development Projects. We require new development and redevelopment to create unique, high-quality places that add value to the community.
• CE-2.2 Development Review. We require those proposing new development and redevelopment to demonstrate how their projects will create appropriately unique, functional, and sustainable places that will compete well with their competition within the region.
• CE-2.4 Protection of Investment. We require that new development and redevelopment protect existing investment by providing architecture and urban design of equal or greater quality.
• CE-2.5 Private Maintenance. We require adequate maintenance, upkeep, and investment in private property because proper maintenance on private property protects property values.

Mobility Element
Goal M-1 Roadway System: A system of roadways that meets the mobility needs of a dynamic and prosperous Ontario.
• M-1.4 Complete Streets. We work to provide a complete, balanced, context-aware, multimodal transportation network that meets the needs of all users of streets, roads, and highways, including motorists, pedestrians, bicyclists, children, persons with disabilities, seniors, movers of commercial goods, and users of public transportation. We prioritize implementation of complete streets improvements in environmental justice areas to facilitate opportunities for residents to use active transportation systems.

Goal M-2 Active Transportation: A system of trails and corridors that facilitate and encourage active modes of transportation.
• M-2.3 Pedestrian Walkways. We require streets to include sidewalks and visible crosswalks at major intersections where necessary to promote safe and comfortable mobility between residential areas, businesses, schools, parks, recreation areas, and other key destination points. 4938
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 13 of 25 ends

Community Design Element
Goal CD-1 Image & Identity: A dynamic, progressive city containing distinct and complete places that foster a positive sense of identity and belonging among residents, visitors, and businesses.
• CD-1.1 City Identity. We take actions that are consistent with the City being a leading urban center in Southern California while recognizing, enhancing, and preserving the character of our existing viable neighborhoods. • CD-1.4 Transportation Corridors. We will enhance our major transportation corridors within the City through landscape, hardscape, signage and lighting. The extent of enhancement should be appropriate to the use, type, and context of each corridor.

Goal CD-2 Design Quality: A high level of design quality resulting in neighborhoods, public spaces, parks, and streetscapes that are attractive, safe, functional, human-scale, and distinct.
• CD-2.1 Quality Building Design and Architecture. We encourage all development projects to convey visual interest and character through:

1. Building volume, massing, and height to provide contextappropriate scale and proportion;

2. A true architectural style which is carried out in plan, section, and elevation through all aspects of the building and site design and appropriate for its setting; and

3. Exterior building materials that are articulated, high quality, durable, and appropriate for the architectural style.
• CD-2.5 Streetscapes. We design new and, when necessary, retrofit existing streets to improve walkability, bicycling and transit integration, strengthen connectivity, and enhance community identity through improvements to the public right-of-way such as sidewalks, street trees, parkways, curbs, street lighting and street furniture.
• CD-2.6 Connectivity. We promote development of local street patterns, multimodal networks, and connected public spaces that create and unify neighborhoods, rather than divide them, and create cohesive and continuous corridors, rather than independent “islands” through the following means:
4939
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 14 of 25 ends

1. Local street networks that provide access both between subdivisions and within neighborhoods and discourage through traffic;

2. A local street system that is logical and understandable for the user.

A grid system is preferred to avoid circuitous and confusing travel paths between internal neighborhood areas and adjacent arterials and to provide adequate emergency and evacuation access; and

3. Pedestrian and bicycle networks that provide convenient access to neighborhoods and nearby destinations, such as schools, parks, other public spaces, commercial areas, and transit stops. • CD-2.8 Safe Design. We incorporate defensible space design into new and existing developments to ensure the maximum safe travel and visibility on pathways, corridors, and open space and at building entrances and parking areas by avoiding physically and visually isolated spaces, maintaining visibility and accessibility, and using lighting. • CD-2.9 Landscape Design. We encourage durable, sustainable, and drought-tolerant landscaping materials and designs that enhance the aesthetics of structures, create and define public and private spaces, and provide shade and environmental benefits.
• CD-2.10 Parking Areas. We require all development, including single-family residential, to minimize the visual impact of surface, structured, and garage parking areas visible from the public realm in an aesthetically pleasing, safe and environmentally sensitive manner. Examples include:

1. Surface parking: Shade trees, pervious surfaces, urban run-off capture and infiltration, and pedestrian paths to guide users through the parking field.
• CD-2.12 Site and Building Signage. We encourage the use of sign programs that utilize complementary materials, colors, and themes. Project signage should be designed to effectively communicate and direct users to various aspects of the development and complement the character of the structures
• CD-2.13 Entitlement Process. We work collaboratively with all stakeholders to ensure a high degree of certainty in the efficient review and timely processing of all development plans and permits.

Goal CD-5 Protection of Investment: A sustained level of maintenance and improvement of properties, buildings, and infrastructure that protects property values and encourages additional public and private investments.
4940
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 15 of 25 ends

• CD-5.1 Maintenance of Buildings and Property. We require all public and privately-owned buildings and property (including trails and easements) to be properly and consistently maintained.
• CD-5.2 Maintenance of Infrastructure. We require the continual maintenance of infrastructure.

HOUSING ELEMENT COMPLIANCE: The Project is consistent with the Housing Element of the Policy Plan (general plan) component of The Ontario Plan, as the Project site is not one of the properties in the Housing Element Sites contained in Tables B-1 and B-2 (Housing Element Sites Inventory) of the Housing Element Technical Report. Approval of this Specific Plan is subject to the adoption and approval of The Ontario Plan (TOP) 2050 Policy Plan Amendment (File No. PGPA25-002) being approved by City Council.

ENVIRONMENTAL REVIEW: The environmental impacts of this Project were reviewed in conjunction with The Ontario Plan (TOP) 2050 Policy Plan Amendment (File No. PGPA25- 002), for which a Supplemental Environmental Impact Report (SEIR) (State Clearinghouse No. 2025110102) was prepared. The SEIR evaluated the potential environmental impacts associated with the Policy Plan Amendment (PPA), which included the EBPSP as part of the overall project under PGPA25-002.

Through the SEIR process, potential impacts were analyzed, and revisions to the proposed project and mitigation measures were identified to reduce environmental effects. As a result, most of the impacts were reduced to a less-than-significant level. However, five impact areas remain significant and unavoidable, even with the implementation of all feasible mitigation measures. These impacts are attributable to the PPA and EBPSP.

The significant and unavoidable impacts identified in the SEIR applicable to EBPSP include:
• Air Quality — Impacts related to consistency with the Air Quality Management Plan and regional operational emissions which would contribute to regional nonattainment conditions within the South Coast Air Basin and expose sensitive receptors to elevated pollutant concentrations.
• Cultural Resources — Although protective regulations and preservation policies are included in The Ontario Plan Policy Plan Amendment (PPA), implementation of the proposed PPA may result in impacts to historic resources. Future development could involve the modification or demolition of historic resources, including Tier III resources, resulting in the destruction or material impairment of their significance. While regulatory protections and project-level review would reduce impacts, such impacts cannot be fully avoided or mitigated in all cases. 4941
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 16 of 25 ends

• Greenhouse Gas Emissions — Impacts associated with increased greenhouse gas emissions and potential inconsistency with the City’s Community Climate Action Plan.
• Noise — Impacts related to traffic noise.
• Transportation — Impacts related to vehicle miles traveled (VMT), which would increase under buildout conditions and cannot be reduced to a less-thansignificant level.

The City of Ontario circulated the Draft Supplemental Environmental Impact Report (Draft SEIR) for public review from March 5, 2026, through April 20, 2026. At the conclusion of the public review period, 17 comment letters were received. Areas of concern raised in the comments include the loss of agricultural land, environmental impacts associated with warehouse development, and requests for a warehouse moratorium. Responses to all comments received will be provided in the Final SEIR, Section 2, Response to Comments.

While 5 significant and unavoidable Project impacts have been identified, Staff finds that the Project's benefits outweigh the unavoidable adverse environmental effects. The Project provides the following benefits:
 Supports implementation of TOP 2050 by advancing a coordinated land use framework that aligns policy direction with site-specific planning; facilitates employment-generating uses through the establishment of the EBPSP and targeted reallocation of land uses within Ontario Ranch;  Improves land use compatibility by directing business park and industrial uses to appropriate locations and incorporating updates to circulation patterns, including truck route modifications consistent with State requirements under AB 98;  Supports the extension and coordination of infrastructure improvements necessary to accommodate planned growth, including circulation, utilities, and public services; and
 Provides economic benefits to the community through expanded employment opportunities and strengthening of the City’s economic base.

Approval of this Specific Plan is subject to the adoption and approval of The Ontario Plan (TOP) 2050 Policy Plan Amendment (File No. PGPA25-002) and the associated SEIR. 4942
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 17 of 25 ends

TECHNICAL APPENDIX:

Table 1: Surrounding Zoning and Land Uses
Existing
Land Use
Policy Plan
Designation
Zoning
Designation
Specific Plan
Land Use
Site Farming/Agriculture
Land Uses
Business Park and
Open Space
EBPSP
Business Park (BP) and
Open SpaceRecreation (OS-R)
North Farming/Agriculture
Land Uses
Open SpaceRecreation
CenterPark
Specific Plan Open Space (OS-R)
South Industrial Development Business Park
South Ontario Logistics
Center Specific Plan,
Merrill Commerce
Center Specific Plan
Business Park
East Farming/Agriculture
Land Uses
Mixed-Use, Open
Space-Recreation, MDR Specific Plan (SP) N/A
West Vacant Land/Dairy
Land Uses
Mixed-Use Specific Plan (SP) N/A
4943
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 18 of 25 ends

Exhibit A: PROJECT LOCATION MAP
4944
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 19 of 25 ends

Exhibit B: EUCALYTUS BUSINESS PARK SPECIFIC PLAN LAND USE MAP 4945
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 20 of 25 ends

Exhibit C: EUCALYPTUS BUSINESS PARK LAND USE SUMMARY
4946
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 21 of 25 ends

Exhibit D: SPECIFIC PLAN CIRCULATION PLAN
4947
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 22 of 25 ends

Exhibit E: PROPOSED PHASING PLAN
4948
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 23 of 25 ends

Exhibit F: SPECIFIC PLAN PROPOSED ARCHITECTURE DESIGN GUIDELINES

4949
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 24 of 25 ends

Exhibit G: THE ONTARIO PLAN (GENERAL PLAN) LAND USE PLAN 4950
Planning Commission Agenda Report
File No.: PSP24-003
April 28, 2026

Page 25 of 25 ends

Attachment A:

Resolution for File No. PSP24-003
(Document to follow this page)
4951
RESOLUTION NO. PC26-025

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF

ONTARIO, CALIFORNIA, RECOMMENDING THE CITY COUNCIL

APPROVE THE EUCALYPTUS BUSINESS PARK SPECIFIC PLAN (FILE NO. PSP24-003), TO ESTABISH THE LAND USE DISTRICTS,

DEVELOPMENT STANDARDS, DESIGN GUIDELINES,
INFRACTRUCTURE IMPROVEMENTS, ETC., FOR THE POTENTIAL
DEVELOPMENT OF 2,939,000 SQUARE FEET OF BUSINESS PARK
DEVELOPMENT, 10,000 SQUARE FEET OF COMMERCIAL
DEVELOPMENT AND APPROXIMATELY 37-ACRES OF OPEN
SPACE/PARKLAND ON APPROXIMATELY 189 ACRES OF LAND FOR

PROPERTY GENERALLY LOCATED ALONG THE NORTHEAST

CORNER OF CAMPUS AVENUE AND EUCALYPTUS AVENUE,

LOCATED WITHIN THE SP (SPECIFIC PLAN) AND AG (AGRICULTURAL

OVERLAY) ZONING DISTRICTS, AND MAKING FINDINGS IN SUPPORT THEREOF—APNS: 1053-531-01, 1053-531-02, 1053-531-03, 1053-531- 04, 1053-541-01, 1053-541-02, 1053-551-01, 1053-371-01, 1053-371-02, 1053-581-03, 1053-581-04, 0216-321-01, 0216-321-02, 0216-321-06, 0216-321-07, 0216-322-01, 0216-322-02, 0216-322-10.

WHEREAS, ONTARIO RANCH VENTURE II, LLC. ("Applicant") has filed an Application for the approval of a Specific Plan, File No. PSP24-003 (Eucalyptus Business Park Specific Plan), as described in the title of this Resolution (hereinafter referred to as "Application" or "Project"); and
WHEREAS, the Project site is made up of eighteen separate parcels comprising approximately 189-acres of land and is generally bounded by Walker Avenue to the east, Campus Avenue to the west, Eucalyptus Avenues to the south and Ontario Ranch Road to the north within the SP (Specific Plan) and AG (Agricultural Overlay) zoning districts; and;
WHEREAS, the property to the north of the Project site is within the CenterPark Specific Plan zoning district and is developed with farming/agriculture and dairy farm purposes, the property to the south is within the South Ontario Logistics Center Specific Plan and Merrill Commerce Center Specific Plan and is developed with business park development, the property to the east and west is within Specific Plan (SP) zoning district and is currently improved with farming/agriculture land uses; and WHEREAS, the Eucalyptus Business Park Specific Plan, attached hereto as Attachment A, will facilitate the potential development of 2,939,000 square feet of business park development with a maximum Floor Area Ratio of 0.55 and will also allow for up to 10,000 square feet of support commercial/retail uses; and 4952
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 2 ends

WHEREAS, the Eucalyptus Business Park Specific Plan establishes a comprehensive set of design guidelines and development regulations to guide and regulate site planning, landscape, architectural character, circulation, permitted uses, infrastructure, among others to ensure all future development is consistent with the goals and policies of The Ontario Plan; and
WHEREAS, the Eucalyptus Business Park Specific Plan has been prepared in conformance with the goals and policies of the City of Ontario Policy Plan (TOP 2050) (General Plan); and
WHEREAS, the Application is a project pursuant to the California Environmental Quality Act — Public Resources Code Section 21000 et seq. — (hereinafter referred to as "CEQA") and an initial study has been prepared to determine possible environmental impacts; and
WHEREAS, the environmental impacts of this Project were reviewed in conjunction with File No. PGPA25-002, an amendment to The Ontario Plan (TOP) 2050 Policy Plan, for which a Supplemental Environmental Impact Report (SEIR) (State Clearinghouse No. 2025110102) was prepared, including a Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations; and WHEREAS, the Plan Policy Amendment SEIR associated with File No. PGPA25- 002 evaluated the potential environmental impacts associated with implementation of the EBPSP, including site-specific development, land use organization, circulation, and infrastructure within the Specific Plan area; and
WHEREAS, the SEIR for File No. PGPA25-002, which included a Statement of Overriding Considerations, was prepared in accordance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the City of Ontario Guidelines for implementation of CEQA; and
WHEREAS, the SEIR for File No. PGPA25-002 was prepared to address the environmental effects of the proposed EBPSP; and
WHEREAS, the City's "Local Guidelines for the Implementation of the California Environmental Quality Act (CEQA)" provide for the use of a single environmental assessment in situations where the impacts of subsequent projects are adequately analyzed; and
WHEREAS, Ontario Development Code Table 2.02-1 (Review Matrix) grants the Planning Commission the responsibility and authority to review and make recommendation to the City Council on the subject Application; and 4953
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 3 ends

WHEREAS, approval of this Specific Plan is contingent on the approval of File No.

PGPA25-002 by City Council; and
WHEREAS, the Project has been reviewed for consistency with the Housing Element of the Policy Plan component of The Ontario Plan 2050, as State Housing Element law (as prescribed in Government Code Sections 65580 through 65589.8) requires that development projects must be consistent with the Housing Element, if upon consideration of all its aspects, it is found to further the purposes, principals, goals, and policies of the Housing Element; and
WHEREAS, the Project is located within the Airport Influence Area of Ontario International Airport, which encompasses lands within parts of San Bernardino, Riverside, and Los Angeles Counties, and is subject to, and must be consistent with, the policies and criteria set forth in the Ontario International Airport Land Use Compatibility Plan (hereinafter referred to as "ALUCP"), which applies only to jurisdictions within San Bernardino County, and addresses the noise, safety, airspace protection, and overflight impacts of current and future airport activity; and
WHEREAS, the proposed Project is located within the Airport Influence Area of Chino Airport, within the City of Ontario boundary, and is subject to, and must be consistent with, the policies criteria set forth in Reference I, Chino Airport Land Use Compatibility Plan (CNO ALUCP), which applies only to jurisdictions within City of Ontario, and addresses the safety, airspace protection, and overflight impacts of current and future airport activity; and
WHEREAS, City of Ontario Development Code Division 2.03 (Public Hearings) prescribes the manner in which public notification shall be provided and hearing procedures to be followed, and all such notifications and procedures have been completed; and
WHEREAS, on April 28, 2026, the Planning Commission of the City of Ontario conducted a hearing to consider the Project, and concluded said hearing on that date; and
WHEREAS, all legal prerequisites to the adoption of this Resolution have occurred.

NOW, THEREFORE, IT IS HEREBY FOUND, DETERMINED, AND RESOLVED by the Planning Commission of the City of Ontario, as follows:

SECTION 1: Environmental Determination and Findings. As the recommending body for the Project, the Planning Commission has reviewed and considered the information contained in the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) prepared for File No. PGPA25-002, which 4954
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 4 ends

evaluated the potential environmental impacts associated with implementation of the EBPSP. Based upon the facts and information contained in the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) prepared for File No. PGPA25-002, and supporting documentation, the Planning Commission finds as follows:
(1) The environmental impacts of this Project were previously reviewed in conjunction with File No. PGPA25-002, The Ontario Plan (TOP) 2050 Policy Plan Amendment, for which a Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) was prepared, including a Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations; and (2) The previous Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102), including the Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations contains a complete and accurate reporting of the environmental impacts associated with the Project; and (3) The previous Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102), including the Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations was completed in compliance with CEQA and the Guidelines promulgated thereunder; and
(4) The previous Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102), including the Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations reflects the independent judgment of the Planning Commission; and
(5) The proposed Project will introduce no new significant environmental impacts beyond those previously analyzed in the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) prepared for File No. PGPA25-002, including the Mitigation Monitoring and Reporting Program and Statement of Overriding Considerations, and all mitigation measures adopted with the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102), are incorporated herein by this reference.

SECTION 2: Subsequent or Supplemental Environmental Review Not Required. Based on the information presented to the Planning Commission, and the specific findings set forth in Section 1, above, the Planning Commission finds that the preparation of a subsequent or supplemental Environmental Impact Report is not required for the Project, as the Project:
(1) Does not constitute substantial change to the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) that was prepared, that will require 4955
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 5 ends

major revisions to the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102), due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and (2) Does not constitute substantial changes with respect to the circumstances under which the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) that was prepared for File No. PGPA25-002, that will require major revisions to the Supplemental Environmental Impact Report due to the involvement of new significant environmental effects or a substantial increase in the severity of the previously identified significant effects; and
(3) Does not contain new information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the Supplemental Environmental Impact Report that was prepared, that shows any of the following:
(a) The Project will have one or more significant effects not discussed in the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) prepared for File No. PGPA25-002; or
(b) Significant effects previously examined will be substantially more severe than shown in the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102); or
(c) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the Project, but the City declined to adopt such measures; or (d) Mitigation measures or alternatives considerably different from those analyzed in the Supplemental Environmental Impact Report (State Clearinghouse No. 2025110102) prepared for File No. PGPA25-002, would substantially reduce one or more significant effects on the environment, but which the City declined to adopt.

SECTION 3: Housing Element Compliance. Pursuant to the requirements of California Government Code Chapter 3, Article 10.6, commencing with Section 65580, as the recommending body for the Project, the Planning Commission finds that based on the facts and information contained in the Application and supporting documentation, at the time of Project implementation, the Project is consistent with the Housing Element of the Policy Plan (General Plan) component of The Ontario Plan 2050, as the Project site is not one of the properties in the Housing Element Sites Inventory contained in Tables B-1 and B-2 of the Housing Element Technical Report.
4956
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 6 ends

SECTION 4: Airport Land Use Compatibility Plan ("ALUCP") Compliance.

The California State Aeronautics Act (Public Utilities Code Section 21670 et seq.) requires that an Airport Land Use Compatibility Plan be prepared for all public use airports in the State; and requires that local land use plans and individual development proposals must be consistent with the policies set forth in the adopted Airport Land Use Compatibility Plan.
(1) On April 19, 2011, the City Council of the City of Ontario approved and adopted the Ontario International Airport Land use Compatibility Plan, establishing the Airport Influence Area for Ontario International Airport, which encompasses lands within parts of San Bernardino, Riverside, and Los Angeles Counties, and limits future land uses and development within the Airport Influence Area, as they relate to noise, safety, airspace protection, and overflight impacts of current and future airport activity. As the recommending body for the Project, the Planning Commission has reviewed and considered the facts and information contained in the Application and supporting documentation against the ONT ALUCP compatibility factors, including [1] Safety Criteria (ONT ALUCP Table 2-2) and Safety Zones (ONT ALUCP Map 2-2), [2] Noise Criteria (ONT ALUCP Table 2-3) and Noise Impact Zones (ONT ALUCP Map 2-3), [3] Airspace protection Zones (ONT ALUCP Map 2-4), and [4] Overflight Notification Zones (ONT ALUCP Map 2-5). As a result, the Planning Commission finds and determines that the Project, when implemented in conjunction with the conditions of approval, will be consistent with the policies and criteria set forth within the ONT ALUCP; and (2) On August 2, 2022, the City Council of the City of Ontario approved and adopted a Development Code Amendment to establish the Chino Airport ("CNO") Overlay Zoning District ("OZD") and Reference I, Chino Airport Land Use Compatibility Plan ("CNO ALUCP"). The CNO OZD and CNO ALUCP established the Airport Influence Area for Chino Airport, solely within the City of Ontario, and limits future land uses and development within the Airport Influence Area, as they relate to safety, airspace protection, and overflight impacts of current and future airport activity. The CNO ALUCP is consistent with policies and criteria set forth within the Caltrans 2011 California Airport Land Use Planning Handbook. The proposed Project is located within the Airport Influence Area of Chino Airport and was evaluated and found to be consistent with the California Airport Land Use Planning Handbook and the CNO ALUCP. As the recommending body for the Project, the Planning Commission has reviewed and considered the facts and information contained in the Application and supporting documentation against the CNO ALUCP compatibility factors, including Safety, Airspace Protection, Overflight. As a result, the Planning Commission finds and determines that the Project, when implemented in conjunction with the conditions of approval, will be consistent with the policies and criteria set forth within the California Airport Land Use Planning Handbook and the Chino ALUCP.
4957
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 7 ends

SECTION 5: Concluding Facts and Reasons. Based upon the substantial evidence presented to the Planning Commission during the above-referenced hearing, and upon the specific findings set forth in the Sections above, the Planning Commission hereby concludes as follows:
(1) The proposed Specific Plan, or amendment thereto, is consistent with the goals, policies, plans and exhibits of the Vision, Policy Plan (General Plan), and City Council Priorities components of The Ontario Plan 2050. The approximately 189- acre Eucalyptus Business Park Specific Plan is suitable for business park, commercial and open space-parkland development and is consistent with the goals and policies, plans and exhibits of the Vision, Policy Plan (TOP 2050) (General Plan), and City Council Priorities components of TOP 2050. In addition, the proposed land uses in the proposed Specific Plan will also be in harmony in terms of access, size, and compatibility with existing land use in the surrounding area; and
(2) The proposed Specific Plan, or amendment thereto, would not be detrimental to the public interest, health, safety, convenience, or general welfare of the City. The proposed Eucalyptus Business Park Specific Plan is in conformance with the Land Use Policies and Goals of the Policy Plan and will provide standards and guidelines for the harmonious development within the districts, in a manner consistent with the Policy Plan. The Specific Plan proposes the potential development of 2,939,000 square feet of business park development, up to 10,000 square feet of commercial/retail development, and approximately 37-acres of open space/parkland on approximately 189 acres of land. The proposed Specific Plan land uses and intensity of development is consistent with the land use plan of the Policy Plan (TOP 2050); therefore, the proposed business park, commercial and open space land uses will not be detrimental to the public interest, health, safety, or general welfare of the City as they are consistent with the existing and future development of the surrounding area; and (3) In the case of an application affecting specific property(ies), the proposed Specific Plan, or amendment thereto, will not adversely affect the harmonious relationship with adjacent properties and land uses. The proposed Specific Plan will modify the land use from farming/agricultural and vacant land uses to Business Park and Open Space-Parkland, which aligns with the surrounding land uses planned in the Policy Plan (TOP) 2050; and
(4) In the case of an application affecting specific property(ies), the subject site is physically suitable, including, but not limited to, parcel size, shape, access, and availability of utilities, for the request and anticipated development.

The proposed Specific Plan will allow for business park, commercial and open space/parkland uses on the subject site. When in conformance with the Specific Plan, the project site is suitable in size and shape, and the project site design allows for sufficient access and availability of utilities to accommodate the anticipated development. 4958
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 8 ends

SECTION 6: Planning Commission Action. Based upon the findings and conclusions set forth in the Sections above, the Planning Commission hereby RECOMMENDS THE CITY COUNCIL APPROVES the herein described Application, subject to each and every condition set forth in the Department reports attached hereto as "Attachment A," and incorporated herein by this reference.

SECTION 7: Indemnification. The Applicant shall agree to defend, indemnify and hold harmless, the City of Ontario or its agents, officers, and employees from any claim, action or proceeding against the City of Ontario or its agents, officers or employees to attack, set aside, void, or annul this approval. The City of Ontario shall promptly notify the Applicant of any such claim, action, or proceeding, and the City of Ontario shall cooperate fully in the defense.

SECTION 8: Custodian of Records. The documents and materials that constitute the record of proceedings on which these findings have been based are located at the City of Ontario City Hall, 303 East "B" Street, Ontario, California 91764. The custodian for these records is the City Clerk of the City of Ontario.

SECTION 9: Certification to Adoption. The Secretary shall certify to the adoption of the Resolution.
- - - - - - - - - - - - - -
4959
4960
4961
Planning Commission Resolution
File No. PSP24-003
April 28, 2026

Page 11 ends

ATTACHMENT A:

File No. PSP24-003
Departmental Conditions of Approval
(Departmental conditions of approval to follow this page) 4962

EUCALYPTUS BUSINESS PARK

CITY OF ONTARIO
4TH DRAFT
APRIL 2026
4963

EUCALYPTUS BUSINESS PARK

SPECIFIC PLAN

CITY OF ONTARIO
Prepared for:

THE CITY OF ONTARIO
303 East B Street
Ontario, CA 91764
(909) 395-2011
Prepared by:

T&B PLANNING, INC.
3200 El Camino Real, Suite 100
Irvine, CA 92602
(714) 505-6360
Contact: Lance Retuya
[email protected]
JOB NUMBER: 971-003
APRIL 2026
4964

CONSULTANT TEAM
CIVIL ENGINEER:

MICHAEL BAKER INTERNATIONAL
5 HUTTON CENTRE DRIVE, SUITE 500
SANTA ANA, CA 92707
(949) 855-7051
CONTACT: CESAR MOTA
[email protected]
ARCHITECT:

RGA, OFFICE OF ARCHITECTURAL DESIGN, INC.
210 PROGRESS, SUITE 220
IRVINE, CA 92618
(949) 341-0920
CONTACT: CHRIS SAVAGE
[email protected]
LANDSCAPE ARCHITECT:

RIDGE LANDSCAPE ARCHITECTS
8841 RESEARCH DRIVE, #200
IRVINE, CA 92618
(949) 387-1323
CONTACT: TRAVIS EBBERT
[email protected]
4965

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
i
ES.1 Specific Plan Overview ............................................................................ ES-1 ES.2 Other Governing Documents ................................................................... ES-1 ES.3 Specific Plan Components ....................................................................... ES-4

1.1 Specific Plan Purpose .................................................................................1-1

1.2 Specific Plan Objectives..............................................................................1-1

1.3 Authority.....................................................................................................1-2

1.4 Severability .................................................................................................1-2

1.5 Approval Process and Companion Actions..................................................1-3

1.6 Relationship to The Ontario Plan (General Plan)..........................................1-3

2.1 Existing Assessor Parcel Number................................................................2-1

2.2 Existing Land Use .......................................................................................2-1

2.3 Surrounding Land Uses ..............................................................................2-1

2.4 Existing Circulation and Access ..................................................................2-1

2.4.1 Regional Circulation.......................................................................2-1

2.4.2 Local Circulation............................................................................2-1

2.5 Williamson Act ............................................................................................2-2

2.6 Existing Physical Site Conditions .................................................................2-6

2.6.1 Topography...................................................................................2-6

2.6.2 Hydrology......................................................................................2-6

2.6.3 Geology and Soils..........................................................................2-6

2.6.4 Vegetation and Biological Resources .............................................2-6

2.6.5 Existing Ground Water Wells..........................................................2-6

2.6.6 Existing NPDES Compliance..........................................................2-7

3.1 Vision .........................................................................................................3-1

3.2 Land Use Plan ............................................................................................3-1

3.2.1 Business Park................................................................................3-2

3.2.2 Open Space - Parkland .................................................................3-2 4966

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ii

3.3 Airport Influence Compliance......................................................................3-2

3.4 Conceptual Site Plan ..................................................................................3-2

4.1 Circulation and Access Plan .......................................................................4-1

4.1.1 Vehicular Circulation......................................................................4-1

4.1.2 Non-Vehicular Circulation ............................................................4-11

4.2 Utility Infrastructure Plan ...........................................................................4-13

4.2.1 Potable Water Plan ......................................................................4-13

4.2.2 Recycled Water Plan ...................................................................4-17

4.2.3 Sanitary Sewer Plan.....................................................................4-19

4.2.4 Storm Water Management Plan ...................................................4-22

4.2.5 Dry Utilities Plan ..........................................................................4-26

4.3 Conceptual Grading Plan..........................................................................4-26

5.1 Purpose and Intent .....................................................................................5-1

5.2 Definition of Terms......................................................................................5-1

5.3 Applicability ................................................................................................5-1

5.4 Permitted, Conditionally Permitted, and Administratively Permitted Uses.....5-1

5.5 Business Park Development Standards.....................................................5-12

5.5.1 Other Development Standards ....................................................5-13

5.6 Open Space – Parkland Development Standards......................................5-14

6.1 Purpose and Intent .....................................................................................6-1

6.2 Parkland Guidelines ....................................................................................6-1

6.3 Business Park Design Theme......................................................................6-2

6.4 Business Park Architecture Guidelines........................................................6-2

6.4.1 Architectural Theme ......................................................................6-2

6.4.2 Building Form ................................................................................6-3

6.4.3 Building Materials, Colors, and Textures ........................................6-4

6.4.4 Windows and Doors.......................................................................6-4

6.4.5 Rooftop Equipment Screening .......................................................6-5

6.5 Business Park Site Features Guidelines.......................................................6-6

6.5.1 Parking and Loading Areas............................................................6-6

6.5.2 Outdoor Employee Amenity Areas .................................................6-6 4967

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
iii

6.5.3 Outdoor Equipment Placement......................................................6-7

6.5.4 Trash Enclosures...........................................................................6-7

6.5.5 Walls and Fences ..........................................................................6-8

6.6 Energy Efficiency Guidelines .......................................................................6-9

6.7 Lighting Guidelines .....................................................................................6-9

6.8 Signage Guidelines ...................................................................................6-10

6.9 Landscape Guidelines ..............................................................................6-12

6.9.1 Plant Palette ................................................................................6-13

6.9.2 Irrigation......................................................................................6-17

6.10 Streetscape Guidelines .............................................................................6-17

6.10.1 Campus Avenue........................................................................6-17

6.10.2 Bon View Avenue ......................................................................6-17

6.10.3 Grove Avenue ...........................................................................6-17

6.10.4 Walker Avenue ..........................................................................6-18

6.10.5 Eucalyptus Avenue ....................................................................6-18

6.10.6 Public Street ‘A’ .........................................................................6-18

6.11 Entries and Monuments Guidelines ...........................................................6-25

6.11.1Primary Corner Treatments..........................................................6-25

6.11.2Secondary Corner Treatments.....................................................6-25

6.12 Landscape Interface .................................................................................6-29

6.13 Water Quality Basin Guidelines .................................................................6-29

6.14 Stormwater Infiltration Areas Guidelines....................................................6-29

7.1 Severability .................................................................................................7-1

7.2 Applicability ................................................................................................7-1

7.3 Interpretation ..............................................................................................7-1

7.4 Development Review Process.....................................................................7-1

7.4.1 Subdivision Map ............................................................................7-1

7.4.2 Development Plan Review .............................................................7-1

7.4.3 Development Agreements .............................................................7-2

7.4.4 Conditional Use Permits ................................................................7-2

7.4.5 Variances ......................................................................................7-2

7.5 Substantial Conformance............................................................................7-2

7.6 Formal Amendments to the Specific Plan ....................................................7-3

7.7 Appeals ......................................................................................................7-4

7.8 Compliance with Mitigation Monitoring and Reporting Program ...................7-4

7.9 Project Financing........................................................................................7-4 4968

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
iv

7.9.1 Facilities and Services ...................................................................7-4

7.9.2 Operation and Maintenance ..........................................................7-4

7.10 Phasing Plan...............................................................................................7-5

7.11 Maintenance Plan .......................................................................................7-5 A Policy Plan Consistency Analysis ............................................................... A-1 4969

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
v

LIST OF FIGURES

Figure ES-1 Regional Map ................................................................................................... ES-2 Figure ES-2 Vicinity Map...................................................................................................... ES-3 Figure 1-1 Existing General Plan Land Use Designations ......................................................1-5 Figure 1-2 Proposed General Plan Land Use Designations ...................................................1-6 Figure 1-3 Existing Zoning Designations ...............................................................................1-7 Figure 1-4 Proposed Zoning Designations ............................................................................1-8 Figure 2-1 Existing APNs ......................................................................................................2-3 Figure 2-2 Aerial Photograph................................................................................................2-4 Figure 2-3 Existing Surrounding Land Uses ..........................................................................2-5 Figure 2-4 USGS Topographic Map......................................................................................2-8 Figure 2-5 Existing Water Wells ............................................................................................2-9 Figure 3-1 Conceptual Land Use Plan ..................................................................................3-4 Figure 3-2 Chino Safety Zone ...............................................................................................3-5 Figure 3-3 Conceptual Site Plan ...........................................................................................3-6 Figure 4-1 Existing Vehicular Circulation and Access Plan ....................................................4-2 Figure 4-2 Conceptual Vehicular Circulation and Access Plan ..............................................4-3 Figure 4-3 Street Sections – Campus Avenue, Bon View Avenue, and Grove Avenue ...........4-6 Figure 4-4 Street Sections – Walker Avenue, Eucalyptus Avenue, and Public Street ‘A’ ......4-10 Figure 4-5 Conceptual Non-Vehicular Circulation and Mobility Plan ....................................4-12 Figure 4-6 Potable Water Infrastructure Plan.......................................................................4-15 Figure 4-7 City of Ontario Ultimate Water System ...............................................................4-16 Figure 4-8 Recycled Water Infrastructure Plan....................................................................4-18 Figure 4-9 Sanitary Sewer Infrastructure Plan .....................................................................4-21 Figure 4-10 Storm Drain Infrastructure Plan..........................................................................4-24 Figure 4-11 City of Ontario Planned Drainage Facilities.........................................................4-25 Figure 4-12 Dry Utilities Infrastructure Plan...........................................................................4-27 Figure 4-13 Fiber Optics Plan ...............................................................................................4-28 Figure 6-1 Conceptual Landscape Plan ..............................................................................6-16 Figure 6-2 Campus Avenue Streetscape ............................................................................6-19 Figure 6-3 Bon View Avenue Streetscape...........................................................................6-20 Figure 6-4 Grove Avenue Streetscape................................................................................6-21 Figure 6-5 Walker Avenue Streetscape...............................................................................6-22 Figure 6-6 Eucalyptus Avenue Streetscape ........................................................................6-23 Figure 6-7 Public Street ‘A’ Streetscape .............................................................................6-24 Figure 6-8 Conceptual Primary Corner Treatment...............................................................6-27 Figure 6-9 Conceptual Secondary Corner Treatment..........................................................6-28 Figure 6-10 Conceptual Landscape Interface – Business Park to Open Space Parkland .......6-30 Figure 7-1 Phasing Plan........................................................................................................7-8 4970

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
vi

LIST OF TABLES

Table ES-1 Land Use Summary .......................................................................................... ES-1 Table 2-1 Existing APN List .................................................................................................2-1 Table 3-1 Land Use Plan Statistical Summary......................................................................3-1 Table 5-1 Permitted Land Uses ...........................................................................................5-3 Table 5-2 Development Standards ....................................................................................5-12 Table 5-3 Minimum Building and Parking Setback Requirements .......................................5-12 Table 5-4 Minimum Drive Aisle and Parking Space Separation Requirements ....................5-12 Table 5-5 Parking Space Requirements.............................................................................5-13 Table 6-1 Plant Palette ......................................................................................................6-14 Table 7-1 Maintenance Responsibilities ...............................................................................7-6

4971

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ES-1

EXECUTIVE SUMMARY
ES.1 Specific Plan Overview
The Eucalyptus Business Park Specific Plan
area covers approximately 189.0 acres in the
southern portion of the City of Ontario. The
Specific Plan area is located north of
Eucalyptus Avenue, south of Ontario Ranch
Road, east of Campus Avenue, and west of
Walker Avenue.

The location of the Eucalyptus Business Park
Specific Plan area in regional and local
contexts are depicted in Figure ES-1, Regional
Map, and Figure ES-2, Vicinity Map, which
show the locational setting of the Specific Plan
area with surrounding jurisdictions.

The information in this Specific Plan will guide
the development of a modern business park
and the establishment of public park space
and will address the interface between the two
uses. The Specific Plan area is envisioned to
provide business park development between
Eucalyptus Avenue and a new east-west
public street and a public park north of the new
public street.

The public park land in the northern portion of
the Specific Plan area is expected to provide
passive park areas for the City of Ontario such
as open space areas, benches, and trails.

The business park area is intended to contain
employment-generating uses supported by
roadways, utility infrastructure, parking areas
for automobiles, commercial vehicles, and
trucks, designed in a master-planned setting
accented by attractive lighting, landscaping,
signage, and other functional and decorative
features. Buildings are intended to be
welcoming to local, national, and international
businesses that can bring job opportunities
and economic growth to the City of Ontario,
including but not limited to corporate offices,
technology centers, light manufacturing,
research and development, warehousing and
distribution, and support retail. In addition,
space for a potential publicly operated animal
resource center is reserved within the Specific
Plan area.

A summary of the proposed land uses is as
follows:

Table ES-1 Land Use Summary
Land Use
Designation Acreage1
Maximum
Building Square
Footage
Business Park 137.90 2,939,000
Open Space
– Parkland 35.88 --
Roadway 15.24 --
TOTAL 189.0 AC 2,939,000 SF
1Acreages are approximate and subject to survey verification. 2Total acreage of 189.0 is rounded up to the nearest one-tenth of an acre.

ES.2 Other Governing Documents
In addition to this Specific Plan, which includes
a Land Use Plan, Infrastructure Plan,
Development Regulations, Design Guidelines,
and an Implementation Plan tailored to the
Eucalyptus Business Park Specific Plan area,
the following documents also contain
applicable information:
• The Ontario Policy Plan (which serves as
the City’s State-mandated General Plan)
that includes City-wide policies pertaining
to land use, housing, mobility, safety,
environmental resources, parks and
recreation, community economics,
community design, and social resources.
4972

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
r-1- I I :_ _____ _j
I I
/-'u---\
LA
VERNE

CLAREMO
: \
T/ ~==-==;;===\::====tim1F====#==~ ~
\ RANCHO 7 UPLAND ,J" CUCAMONGA
""===--===!=, ===9t====(,.:~=====1liF===#-=====l~~=F"""'oc-i /-.__, : I --- IL_ __ \
~- I - ~ - -=/'--~

MONTCLAIR
ELES I i
NTY fl. ,-~
ONA ,' -.f~_j __ ,
CHINO
HILLS
,-_l
CHINO

SAN BERNARDINO
COUNTY

ONTARIO
_ _j
_ _I
'
JURUPA
VALLEY
,
\ RIVERSIDE
' l
'\_,,_{ ../'. _ _J :\ ~::::;::v
YO B LINDA ~==A==:<7 --v --'-,_........._., . .,sANAHEIM CORONA I
-- I
, ~ --~ I
,J VILLA ,--_-:::-:;

I PAR I
I
!~~ I
Source(s): Esri, LA County (2025), Nearmap Imagery (January 2025), RCIT (2025), San Bernardino County (2025) ~ 0 0.75 1.5 3
~---Miles
'·\A., .. _,/-L_
,-
' _r'. -L....,
,_L, l
Figure ES-1
Regional Map
ES-2
4973

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
I
I
l RIVERSIDE DR 1-------=a------,.---------;:---,.-----;-----------t-~-...!.----2...___J w
w w w :1c
~ :1c :1c :1c cc ~ w w w > w :1c
C CC 111 3l: ~ ! 1---------"'~'•--Z--~--~--o--~
u ~ :ii > :ii 0
;1c : ;1c C
"'--W--a: __ a:r---~ce.!:H!!!IN.!,!O,!_A~V!!..!E:....__--1 ~ :ii: ~ ~ ::, ::, cc z cc a: W Ill U O U \!I a:i ::,
C ~ CC W 8 i a:i ~ > u

SCHAEFER AVE

ONTARIO RANCH RD

EUCALYPTUS AVE
MERRILL AVE ------------- ------------;----'---

CITY OF
CHINO ~ CHINO AIR ORT

KIMBALL AVE
Source(s): Esri, Nearmap Imagery (January 2025), RCIT (2025), San Bernardino County (2025) ~ 0 875 1,750 3,500
m-..-USFeet
w
:1c
z
cc
:ii
~
~
w
::c '
Figure ES-2
Vicinity Map
ES-3
4974

EUCALYPTUS BUSINESS PARK

CITY OF ONTARIO
4TH DRAFT
APRIL 2026
4975

EUCALYPTUS BUSINESS PARK

SPECIFIC PLAN

CITY OF ONTARIO
Prepared for:

THE CITY OF ONTARIO
303 East B Street
Ontario, CA 91764
(909) 395-2011
Prepared by:

T&B PLANNING, INC.
3200 El Camino Real, Suite 100
Irvine, CA 92602
(714) 505-6360
Contact: Lance Retuya
[email protected]
JOB NUMBER: 971-003
APRIL 2026
4976

CONSULTANT TEAM
CIVIL ENGINEER:

MICHAEL BAKER INTERNATIONAL
5 HUTTON CENTRE DRIVE, SUITE 500
SANTA ANA, CA 92707
(949) 855-7051
CONTACT: CESAR MOTA
[email protected]
ARCHITECT:

RGA, OFFICE OF ARCHITECTURAL DESIGN, INC.
210 PROGRESS, SUITE 220
IRVINE, CA 92618
(949) 341-0920
CONTACT: CHRIS SAVAGE
[email protected]
LANDSCAPE ARCHITECT:

RIDGE LANDSCAPE ARCHITECTS
8841 RESEARCH DRIVE, #200
IRVINE, CA 92618
(949) 387-1323
CONTACT: TRAVIS EBBERT
[email protected]
4977

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
i
ES.1 Specific Plan Overview ............................................................................ ES-1 ES.2 Other Governing Documents ................................................................... ES-1 ES.3 Specific Plan Components ....................................................................... ES-4

1.1 Specific Plan Purpose .................................................................................1-1

1.2 Specific Plan Objectives..............................................................................1-1

1.3 Authority.....................................................................................................1-2

1.4 Severability .................................................................................................1-2

1.5 Approval Process and Companion Actions..................................................1-3

1.6 Relationship to The Ontario Plan (General Plan)..........................................1-3

2.1 Existing Assessor Parcel Number................................................................2-1

2.2 Existing Land Use .......................................................................................2-1

2.3 Surrounding Land Uses ..............................................................................2-1

2.4 Existing Circulation and Access ..................................................................2-1

2.4.1 Regional Circulation.......................................................................2-1

2.4.2 Local Circulation............................................................................2-1

2.5 Williamson Act ............................................................................................2-2

2.6 Existing Physical Site Conditions .................................................................2-6

2.6.1 Topography...................................................................................2-6

2.6.2 Hydrology......................................................................................2-6

2.6.3 Geology and Soils..........................................................................2-6

2.6.4 Vegetation and Biological Resources .............................................2-6

2.6.5 Existing Ground Water Wells..........................................................2-6

2.6.6 Existing NPDES Compliance..........................................................2-7

3.1 Vision .........................................................................................................3-1

3.2 Land Use Plan ............................................................................................3-1

3.2.1 Business Park................................................................................3-2

3.2.2 Open Space - Parkland .................................................................3-2 4978

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ii

3.3 Airport Influence Compliance......................................................................3-2

3.4 Conceptual Site Plan ..................................................................................3-2

4.1 Circulation and Access Plan .......................................................................4-1

4.1.1 Vehicular Circulation......................................................................4-1

4.1.2 Non-Vehicular Circulation ............................................................4-11

4.2 Utility Infrastructure Plan ...........................................................................4-13

4.2.1 Potable Water Plan ......................................................................4-13

4.2.2 Recycled Water Plan ...................................................................4-17

4.2.3 Sanitary Sewer Plan.....................................................................4-19

4.2.4 Storm Water Management Plan ...................................................4-22

4.2.5 Dry Utilities Plan ..........................................................................4-26

4.3 Conceptual Grading Plan..........................................................................4-26

5.1 Purpose and Intent .....................................................................................5-1

5.2 Definition of Terms......................................................................................5-1

5.3 Applicability ................................................................................................5-1

5.4 Permitted, Conditionally Permitted, and Administratively Permitted Uses.....5-1

5.5 Business Park Development Standards.....................................................5-12

5.5.1 Other Development Standards ....................................................5-13

5.6 Open Space – Parkland Development Standards......................................5-14

6.1 Purpose and Intent .....................................................................................6-1

6.2 Parkland Guidelines ....................................................................................6-1

6.3 Business Park Design Theme......................................................................6-2

6.4 Business Park Architecture Guidelines........................................................6-2

6.4.1 Architectural Theme ......................................................................6-2

6.4.2 Building Form ................................................................................6-3

6.4.3 Building Materials, Colors, and Textures ........................................6-4

6.4.4 Windows and Doors.......................................................................6-4

6.4.5 Rooftop Equipment Screening .......................................................6-5

6.5 Business Park Site Features Guidelines.......................................................6-6

6.5.1 Parking and Loading Areas............................................................6-6

6.5.2 Outdoor Employee Amenity Areas .................................................6-6 4979

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
iii

6.5.3 Outdoor Equipment Placement......................................................6-7

6.5.4 Trash Enclosures...........................................................................6-7

6.5.5 Walls and Fences ..........................................................................6-8

6.6 Energy Efficiency Guidelines .......................................................................6-9

6.7 Lighting Guidelines .....................................................................................6-9

6.8 Signage Guidelines ...................................................................................6-10

6.9 Landscape Guidelines ..............................................................................6-12

6.9.1 Plant Palette ................................................................................6-13

6.9.2 Irrigation......................................................................................6-17

6.10 Streetscape Guidelines .............................................................................6-17

6.10.1 Campus Avenue........................................................................6-17

6.10.2 Bon View Avenue ......................................................................6-17

6.10.3 Grove Avenue ...........................................................................6-17

6.10.4 Walker Avenue ..........................................................................6-18

6.10.5 Eucalyptus Avenue ....................................................................6-18

6.10.6 Public Street ‘A’ .........................................................................6-18

6.11 Entries and Monuments Guidelines ...........................................................6-25

6.11.1Primary Corner Treatments..........................................................6-25

6.11.2Secondary Corner Treatments.....................................................6-25

6.12 Landscape Interface .................................................................................6-29

6.13 Water Quality Basin Guidelines .................................................................6-29

6.14 Stormwater Infiltration Areas Guidelines....................................................6-29

7.1 Severability .................................................................................................7-1

7.2 Applicability ................................................................................................7-1

7.3 Interpretation ..............................................................................................7-1

7.4 Development Review Process.....................................................................7-1

7.4.1 Subdivision Map ............................................................................7-1

7.4.2 Development Plan Review .............................................................7-1

7.4.3 Development Agreements .............................................................7-2

7.4.4 Conditional Use Permits ................................................................7-2

7.4.5 Variances ......................................................................................7-2

7.5 Substantial Conformance............................................................................7-2

7.6 Formal Amendments to the Specific Plan ....................................................7-3

7.7 Appeals ......................................................................................................7-4

7.8 Compliance with Mitigation Monitoring and Reporting Program ...................7-4

7.9 Project Financing........................................................................................7-4 4980

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
iv

7.9.1 Facilities and Services ...................................................................7-4

7.9.2 Operation and Maintenance ..........................................................7-4

7.10 Phasing Plan...............................................................................................7-5

7.11 Maintenance Plan .......................................................................................7-5 A Policy Plan Consistency Analysis ............................................................... A-1 4981

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
v

LIST OF FIGURES

Figure ES-1 Regional Map ................................................................................................... ES-2 Figure ES-2 Vicinity Map...................................................................................................... ES-3 Figure 1-1 Existing General Plan Land Use Designations ......................................................1-5 Figure 1-2 Proposed General Plan Land Use Designations ...................................................1-6 Figure 1-3 Existing Zoning Designations ...............................................................................1-7 Figure 1-4 Proposed Zoning Designations ............................................................................1-8 Figure 2-1 Existing APNs ......................................................................................................2-3 Figure 2-2 Aerial Photograph................................................................................................2-4 Figure 2-3 Existing Surrounding Land Uses ..........................................................................2-5 Figure 2-4 USGS Topographic Map......................................................................................2-8 Figure 2-5 Existing Water Wells ............................................................................................2-9 Figure 3-1 Conceptual Land Use Plan ..................................................................................3-4 Figure 3-2 Chino Safety Zone ...............................................................................................3-5 Figure 3-3 Conceptual Site Plan ...........................................................................................3-6 Figure 4-1 Existing Vehicular Circulation and Access Plan ....................................................4-2 Figure 4-2 Conceptual Vehicular Circulation and Access Plan ..............................................4-3 Figure 4-3 Street Sections – Campus Avenue, Bon View Avenue, and Grove Avenue ...........4-6 Figure 4-4 Street Sections – Walker Avenue, Eucalyptus Avenue, and Public Street ‘A’ ......4-10 Figure 4-5 Conceptual Non-Vehicular Circulation and Mobility Plan ....................................4-12 Figure 4-6 Potable Water Infrastructure Plan.......................................................................4-15 Figure 4-7 City of Ontario Ultimate Water System ...............................................................4-16 Figure 4-8 Recycled Water Infrastructure Plan....................................................................4-18 Figure 4-9 Sanitary Sewer Infrastructure Plan .....................................................................4-21 Figure 4-10 Storm Drain Infrastructure Plan..........................................................................4-24 Figure 4-11 City of Ontario Planned Drainage Facilities.........................................................4-25 Figure 4-12 Dry Utilities Infrastructure Plan...........................................................................4-27 Figure 4-13 Fiber Optics Plan ...............................................................................................4-28 Figure 6-1 Conceptual Landscape Plan ..............................................................................6-16 Figure 6-2 Campus Avenue Streetscape ............................................................................6-19 Figure 6-3 Bon View Avenue Streetscape...........................................................................6-20 Figure 6-4 Grove Avenue Streetscape................................................................................6-21 Figure 6-5 Walker Avenue Streetscape...............................................................................6-22 Figure 6-6 Eucalyptus Avenue Streetscape ........................................................................6-23 Figure 6-7 Public Street ‘A’ Streetscape .............................................................................6-24 Figure 6-8 Conceptual Primary Corner Treatment...............................................................6-27 Figure 6-9 Conceptual Secondary Corner Treatment..........................................................6-28 Figure 6-10 Conceptual Landscape Interface – Business Park to Open Space Parkland .......6-30 Figure 7-1 Phasing Plan........................................................................................................7-8 4982

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
vi

LIST OF TABLES

Table ES-1 Land Use Summary .......................................................................................... ES-1 Table 2-1 Existing APN List .................................................................................................2-1 Table 3-1 Land Use Plan Statistical Summary......................................................................3-1 Table 5-1 Permitted Land Uses ...........................................................................................5-3 Table 5-2 Development Standards ....................................................................................5-12 Table 5-3 Minimum Building and Parking Setback Requirements .......................................5-12 Table 5-4 Minimum Drive Aisle and Parking Space Separation Requirements ....................5-12 Table 5-5 Parking Space Requirements.............................................................................5-13 Table 6-1 Plant Palette ......................................................................................................6-14 Table 7-1 Maintenance Responsibilities ...............................................................................7-6

4983

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ES-1

EXECUTIVE SUMMARY
ES.1 Specific Plan Overview
The Eucalyptus Business Park Specific Plan
area covers approximately 189.0 acres in the
southern portion of the City of Ontario. The
Specific Plan area is located north of
Eucalyptus Avenue, south of Ontario Ranch
Road, east of Campus Avenue, and west of
Walker Avenue.

The location of the Eucalyptus Business Park
Specific Plan area in regional and local
contexts are depicted in Figure ES-1, Regional
Map, and Figure ES-2, Vicinity Map, which
show the locational setting of the Specific Plan
area with surrounding jurisdictions.

The information in this Specific Plan will guide
the development of a modern business park
and the establishment of public park space
and will address the interface between the two
uses. The Specific Plan area is envisioned to
provide business park development between
Eucalyptus Avenue and a new east-west
public street and a public park north of the new
public street.

The public park land in the northern portion of
the Specific Plan area is expected to provide
passive park areas for the City of Ontario such
as open space areas, benches, and trails.

The business park area is intended to contain
employment-generating uses supported by
roadways, utility infrastructure, parking areas
for automobiles, commercial vehicles, and
trucks, designed in a master-planned setting
accented by attractive lighting, landscaping,
signage, and other functional and decorative
features. Buildings are intended to be
welcoming to local, national, and international
businesses that can bring job opportunities
and economic growth to the City of Ontario,
including but not limited to corporate offices,
technology centers, light manufacturing,
research and development, warehousing and
distribution, and support retail. In addition,
space for a potential publicly operated animal
resource center is reserved within the Specific
Plan area.

A summary of the proposed land uses is as
follows:

Table ES-1 Land Use Summary
Land Use
Designation Acreage1
Maximum
Building Square
Footage
Business Park 137.90 2,939,000
Open Space
– Parkland 35.88 --
Roadway 15.24 --
TOTAL 189.0 AC 2,939,000 SF
1Acreages are approximate and subject to survey verification. 2Total acreage of 189.0 is rounded up to the nearest one-tenth of an acre.

ES.2 Other Governing Documents
In addition to this Specific Plan, which includes
a Land Use Plan, Infrastructure Plan,
Development Regulations, Design Guidelines,
and an Implementation Plan tailored to the
Eucalyptus Business Park Specific Plan area,
the following documents also contain
applicable information:
• The Ontario Policy Plan (which serves as
the City’s State-mandated General Plan)
that includes City-wide policies pertaining
to land use, housing, mobility, safety,
environmental resources, parks and
recreation, community economics,
community design, and social resources.
4984

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
r-1- I I :_ _____ _j
I I
/-'u---\
LA
VERNE

CLAREMO
: \
T/ ~==-==;;===\::====tim1F====#==~ ~
\ RANCHO 7 UPLAND ,J" CUCAMONGA
""===--===!=, ===9t====(,.:~=====1liF===#-=====l~~=F"""'oc-i /-.__, : I --- IL_ __ \
~- I - ~ - -=/'--~

MONTCLAIR
ELES I i
NTY fl. ,-~
ONA ,' -.f~_j __ ,
CHINO
HILLS
,-_l
CHINO

SAN BERNARDINO
COUNTY

ONTARIO
_ _j
_ _I
'
JURUPA
VALLEY
,
\ RIVERSIDE
' l
'\_,,_{ ../'. _ _J :\ ~::::;::v
YO B LINDA ~==A==:<7 --v --'-,_........._., . .,sANAHEIM CORONA I
-- I
, ~ --~ I
,J VILLA ,--_-:::-:;

I PAR I
I
!~~ I
Source(s): Esri, LA County (2025), Nearmap Imagery (January 2025), RCIT (2025), San Bernardino County (2025) ~ 0 0.75 1.5 3
~---Miles
'·\A., .. _,/-L_
,-
' _r'. -L....,
,_L, l
Figure ES-1
Regional Map
ES-2
4985

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
I
I
l RIVERSIDE DR 1-------=a------,.---------;:---,.-----;-----------t-~-...!.----2...___J w
w w w :1c
~ :1c :1c :1c cc ~ w w w > w :1c
C CC 111 3l: ~ ! 1---------"'~'•--Z--~--~--o--~
u ~ :ii > :ii 0
;1c : ;1c C
"'--W--a: __ a:r---~ce.!:H!!!IN.!,!O,!_A~V!!..!E:....__--1 ~ :ii: ~ ~ ::, ::, cc z cc a: W Ill U O U \!I a:i ::,
C ~ CC W 8 i a:i ~ > u

SCHAEFER AVE

ONTARIO RANCH RD

EUCALYPTUS AVE
MERRILL AVE ------------- ------------;----'---

CITY OF
CHINO ~ CHINO AIR ORT

KIMBALL AVE
Source(s): Esri, Nearmap Imagery (January 2025), RCIT (2025), San Bernardino County (2025) ~ 0 875 1,750 3,500
m-..-USFeet
w
:1c
z
cc
:ii
~
~
w
::c '
Figure ES-2
Vicinity Map
ES-3
4986

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ES-4
• The City of Ontario Development Code
applies to all topics not addressed by this
Specific Plan’s development regulations.

However, if any requirement of this
Specific Plan conflicts with the
Development Code, the provisions of this
Specific Plan shall take precedence.
• The Airport Land Use Compatibility Plan
for Ontario International Airport (ONT)
and the California Airport Land Use
Planning Handbook published by Caltrans
Division of Aeronautics, which contain
criteria that apply to the development
intensity of property located in the ONT’s
airport influence area. A portion of the
Eucalyptus Business Park Specific Plan
area is located in the ONT influence area.
• CNO (Chino Airport) Overlay Zoning
District, which provides a land use
compatibility analysis to minimize hazards
and impacts to the operation of the Chino
Airport and its surroundings. A portion of
the Eucalyptus Business Park Specific
Plan area is located in the Chino Airport
influence area.
• The Mitigation Monitoring and Reporting
Program (MMRP) that is part of the
Eucalyptus Business Park Specific Plan’s
Environmental Impact Report (EIR)
prepared in compliance with the California
Environmental Quality Act (CEQA). The
MMRP stipulates measures that are
required to be implemented to mitigate
the environmental effects of the Specific
Plan’s construction and operation.

ES.3 Specific Plan Components
This Eucalyptus Business Park Specific Plan is
organized into the following chapters:

Chapter 1 – Introduction:

Describes the purpose and objectives of the
Specific Plan, the related entitlement
approvals for implementing development, and
the relationship between the Specific Plan and
the Ontario Policy Plan.

Chapter 2 – Existing Conditions:

Describes the physical setting of the
Eucalyptus Business Park Specific Plan area
and the physical conditions on and
surrounding the property at the time the
Specific Plan was prepared.

Chapter 3 – Land Use Plan:

Describes the Eucalyptus Business Park
Specific Plan’s development plan, which
includes six Business Park planning areas and
three Open Space – Parkland planning areas.

Chapter 3 also specifies the acreages of each
planning area and the maximum development
intensities permitted in each land use
category. Chapter 3 also includes a
conceptual development plan showing how
the area could be developed in compliance
with the Specific Plan.

Chapter 4 – Infrastructure Plan:

Provides information on vehicular and nonvehicular circulation improvements; planned backbone water, sewer, recycled water, and
storm drain systems; and the planned dry
utility network for the development of the
Eucalyptus Business Park Specific Plan area.

Chapter 5 – Development Regulations:

Establishes the list of permitted and
conditionally permitted uses in the Specific
Plan area and presents the development
regulations that govern the uses. Chapter 5
also provides a discussion of the relationship
between the Specific Plan and the City of
Ontario Development Code.

Chapter 6 – Design Guidelines:

Provides site planning, landscaping, and
architectural guidelines for implementing
4987

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ES-5
development within the Specific Plan area.

Guidelines in this chapter address design
characteristics for building placement and
architecture, landscaping, streetscapes, entry
identification monuments, corner treatments
at roadway intersections, walls and fencing,
lighting, and signage.

Chapter 7 – Implementation Plan
Presents the policies and procedures for the
City’s review and approval of implementing
development projects within the Eucalyptus
Business Park Specific Plan area. Chapter 7
also describes the methods and procedures
for interpreting and amending the Specific Plan
as necessary. Additionally, funding and
maintenance responsibilities are summarized
within this Specific Plan.
4988
1-1
CHAPTER 1

INTRODUCTION

1.1 Specific Plan Purpose
The purpose of the Eucalyptus Business Park
Specific Plan is to guide the development of a
189.0-acre site into a modern business park
and public parkland space. The Specific Plan
area is located within the southern portion of
the City of Ontario (City). The Ontario Policy
Plan and the Ontario Development Code
requires the Ontario City Council to approve
Specific Plans as part of the entitlement
process for new development projects within
this area.

Development projects within the Specific Plan
area are required to demonstrate substantial
conformity with the information contained
within this Specific Plan document.

The public parkland area in the northern
portion of the Specific Plan area is intended to
address passive recreational needs of City
residents. The business park area in the
southern portion of the Specific Plan area is
poised to accommodate uses that rely on the
regional transportation network and the site’s
proximity to the Ontario International Airport
(ONT), the Chino Airport, State Route 60 (SR60), State Route 83 (SR-83), State Route 91 (SR-91), Interstate 15 (I-15), and Interstate 10
(I-10). The Specific Plan area is approximately

2.2 miles south of SR-60, approximately 0.5
miles east of SR-83, approximately 7.5 miles
north of SR-91, approximately 4.5 miles west
of I-15, and approximately 5.6 miles south of I10. Additionally, the Port of Long Beach and the Port of Los Angeles, which serve as major
gateways for international trades, are located
approximately 37 miles southwest of the
Specific Plan area.

1.2 Specific Plan Objectives
The Eucalyptus Business Park Specific Plan
achieves the following objectives:
• To provide a land use plan that implements
The Ontario Plan’s vision and appropriately
positions business park and public
parkland uses north of Eucalyptus Avenue,
between Campus Avenue and Walker
Avenue.
• To facilitate the development of a variety of
employment-generating uses in a business
park setting.
• To provide business park uses that are
compatible with surrounding land uses.
• To provide opportunities for positive
economic benefit to the City, including new
revenues that can be used for vital City
services.
• To provide opportunities for the
development of passive use parks
consistent with the City of Ontario’s Grand
Park Master Plan.
• To improve connectivity in the area by
providing pedestrian paths, bicycle routes,
and amenities such as bike racks that
encourage circulation by means not
dependent on a motorized vehicle.
• To identify improvements for water,
recycled water, sewer, storm drain, and
circulation facilities that serve planned land
uses within and adjacent to the Specific
Plan area.
4989

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
1-2
• To set forth a development phasing
sequence that allows for logical
development and aligns with installation of
on-site and off-site infrastructure.
• To define guidelines and standards that
address architecture, landscaping,
streetscapes, entry monuments, corner
treatments, walls and fencing, lighting, and
signage within the Specific Plan area.

1.3 Authority
The Eucalyptus Business Park Specific Plan is
a regulatory document prepared pursuant to
the provisions of California Government Code
§§ 65450 through 65457, which grants local
government agencies the authority to prepare
Specific Plans for the systematic
implementation of their General Plan for all or
part of the area covered by the General Plan.

While The Ontario Plan covers the entire City,
the Specific Plan focuses on the development
within the approximately 189-acre site.

California Government Code §§ 65450
through 65457 establish the authority to adopt
a Specific Plan, identify the required contents
of a Specific Plan, and mandate consistency
with the General Plan. According to California
Government Code § 65451:
(a) A Specific Plan shall include text and a
diagram which specify all the following in
detail:
1) The distribution, location, and extent of
the uses of land, including open space,
within the area covered by the plan.
2) The proposed distribution, location,
and extent and intensity of major
components of public and private
transportation, sewage, water,
drainage, solid waste disposal, energy,
and other essential facilities proposed
to be located within the area covered
by the plan and needed to support the
land uses described in the plan.
3) Standards and criteria by which
development will proceed, and
standards for the conservation,
development, and utilization of natural
resources, where applicable.
4) A program of implementation
measures including regulations,
programs, public works projects, and
financing measures, necessary to
carry out items 1, 2, and 3.
(b) The Specific Plan shall include a statement
of the relationship of the Specific Plan to
the General Plan.

The Eucalyptus Business Park Specific Plan
includes each of the required elements listed
above and establishes the essential link
between the policies of The Ontario Plan’s
Policy Plan and the Eucalyptus Business Park
Specific Plan site. All future development plans
and construction activities within the Specific
Plan area shall be consistent with the
requirements set forth in this Specific Plan and
with all other applicable City regulations.

1.4 Severability
The Eucalyptus Business Park Specific Plan
enables the City of Ontario to facilitate the
processing and approval of development plans
to build out the Specific Plan area. If any
regulation, condition, program, or portion of
this Specific Plan is held invalid or
unenforceable, such portions shall be deemed
separate, distinct, and independent
provisions, and the invalidity of such portions
or provisions shall not affect the validity and
enforceability of the remaining provisions
contained herein.
4990

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
1-3

1.5 Approval Process and Companion
Actions
The Eucalyptus Business Park Specific Plan
and any future amendments are required to be
considered by the City of Ontario Planning
Commission and City Council, and adopted by
ordinance or resolution of the City Council,
pursuant to Ontario Development Code
Section 1.01.035, Relationship to Specific
Plans. More information on implementation
procedures is contained in this Specific Plan
Chapter 7, Implementation Plan.

A Policy Plan (General Plan) Amendment
(GPA) will be processed in conjunction with the
Eucalyptus Business Park Specific Plan. The
GPA is a companion action to the approval of
this Specific Plan that would achieve
consistency between the General Plan land
use designations, this Specific Plan’s land use
designations, and zoning.

Additionally, a tentative parcel map will be
processed by the City of Ontario for the
Specific Plan area indicating the approximate
boundaries and dimensions of parcels and
streets, and the proposed grading for the
Specific Plan area. Following map recordation,
the final map will become the legal document
that identifies developable parcels within the
Specific Plan area.

All development within the Eucalyptus
Business Park Specific Plan area shall be
subject to the Development Plan Review
Process established in the City of Ontario
Development Code. The development
standards and design guidelines provided
within this Specific Plan shall be the design
criteria which the City of Ontario refers to
during the Development Plan Review process.

In addition to this Specific Plan an
Environmental Impact Report (EIR) was
prepared in compliance with the California
Environmental Quality Act (CEQA) to serve as
the project-wide environmental assessment
document. Together, this Specific Plan and the
environmental mitigation measures contained
in the accompanying EIR’s Mitigation
Monitoring and Reporting Program (MMRP)
provide a path to develop the property taking
into account all applicable goals, objectives,
government requirements, and environmental
regulations.

1.6 Relationship to The Ontario
Plan General Plan
The Ontario Plan establishes the direction and
vision for the City’s future and provides a
guidance system to shape the City’s
communities. The Ontario Plan consists of a
six-part Component Framework: 1) Vision, 2)
Governance Manual, 3) Policy Plan, 4) City
Council Priorities, 5) Implementation, and 6)
Tracking and Feedback.

The Eucalyptus Business Park Specific Plan
defines the methods and requirements for
implementing development within the Specific
Plan area to ensure that applicable policies
from The Ontario Plan and its Policy Plan are
implemented and ensure that development
envisioned by this Specific Plan is consistent
with applicable provisions of The Ontario Plan.

The Ontario Plan sets forth long-term goals for
the City’s growth and development as
mandated by State law. The Policy Plan is a
long-term policy document that covers the
elements of land use, housing, parks and
recreation, environmental resources,
community economics, safety, mobility,
community design, and social resources.

As shown on Figure 1-1, Existing General Plan
Land Use Designations, the Policy Plan
component of The Ontario Plan designates the
Specific Plan area as Medium Density
Residential with Affordable Housing Overlay,
Mixed-Use Eucalyptus/Chino Airport Overlay
4991

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
1-4
with Affordable Housing Overlay, and Open
Space – Parkland.

As shown on Figure 1-2, Proposed General
Plan Land Use Designations, the General Plan
Amendment being processed concurrently
with this Specific Plan will modify the Ontario
Plan’s designations of the Specific Plan area to
Business Park and Open Space – Parkland.

As shown on Figure 1-3, Existing Zoning
Designations, the City of Ontario’s Zoning Map
designates the Specific Plan area’s zoning as
“Specific Plan with an Agricultural and an
Affordable Housing Overlay”.

As shown on Figure 1-4, Proposed Zoning
Designations, the Zone Change being
processed concurrently with this Specific Plan
will modify the City of Ontario’s Zoning Map of
the site to “Eucalyptus Business Park Specific
Plan” to allow for the development of Business
Park and Open Space – Parkland uses.

Pursuant to the City of Ontario’s adoption of
the Eucalyptus Business Park Specific Plan,
the Specific Plan will take precedence over the
City’s Development Code. In instances where
the Specific Plan is silent on development
standards, the City’s Development Code shall
prevail.
4992
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . : : : : : : MDR:;: : ~::: . . . . . . .. . ~ .... , .. . . . . . . . . . . . . . . . .. . . .. ........... ... ......

BP
: : : : : : : MDR : : : : : : :
::::::: .... ::::::: ~~
========= H~HH~Ftii~=~===
..... .... . ~, ---- .. .. ........ . 0
................... ..

BP ~

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
. . . . . . . . . . .. ....... . . . . . . . . . . . . . . . . . . . . . ......... . . ............... .. ,, . . . . , ...... . . .............. .. ... .. : : : : : : : MDR : : ~ : : : : . . . . . . . . . . . . . ,, ..... .. . ............... ..... , . "·•·····••. 1••··· .. ••••• • .. .. . ..... . ....... ... .. .. .. ....... . . . . . . . . .. . . , .. , ..... ········, ··· ••'••···· BP
. .. ....... . ...........
. . . . . . . . . . ..........
. ........ . . ........ . . ........ . . ........ . . . . . . . . . . .

L--__JL---L---+---+----'-----------1 I
IND
Legend
t:J Specific Plan Area
City of Ontario
General Plan Land Use Designations
-
-
I I
-
-..

Medium Density Residential (MDR)
Mixed Use (MU)
Business Park (BP)
Industrial (IND)
Open Space - Recreation (OS-R)
Source(s): City of Ontario (09-05-2024), Esri, Nearmap Imagery (January 2025), San Bernardino County (2025) ~o
~---Feet
225 450 900
Overlays
!Hmmfi: Affordable Housing - AH
:_-:::_-_-: Chino Airport Influence Area
IND
Figure 1-1
Existing General Plan Land Use Designations
1-5
4993

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
__ _j_ __ _J _____ _
----CJ-1,--r-- 1 LMDR 111 MDR ii ~ I •
-----t --~---~ - 1gl -~~ •
I I I ----~r------------1~-----------

BP I I BP I I BP

I I EUCALYPTUS AVE
----- ,---r--"' ,~-T-,--r------ ,,,-,--=,=-===-,--==r==-7 r-= J_ -1~ BP _ JI J_l_ I t _J ___ JII_J_J _ _!,P _J ___ ~ ~--1 1---1 r--+ Legend ii ii
I Ill I s a:::~:c Plan Area ---~ r--
r--1 I _ IND- General :
1 ::ul;•:e~:~ :::i::;:::l•(:DR) tt;ysChino Airport Influence Area --=--=-_J i_lND_ I 1
1 J I ~ Mixed Use(MU) i 1
___ 11 __ + I Business Park (BP) ---~ ii
I I I __ Industrial (IND) JI ~---
1 I I I - Open Space - Recreation (OS-R) II II .. Source(s): City of Ontario (09-05-2024), Esri, Nearmap Imagery (January 2025), San Bernardino County (2025) ~ 0 225 450 900
~---Feet
Figure 1-2
Proposed General Plan Land Use Designations
1-6
4994
9ntario R~~c
Business·,Rar
(PSP18-00~
South Ontario Logistics Cen~~r
(PSP19-001)
D Specific Plan Area
City of Ontario Overlays
• -:.,--*'lf"".f:"~'1'1"~

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
~
~ ~ ------'-~M:.:::e:.:..rc..:.: ril I _C_Qm,mer_c_e_C_enter __ _., 1~-----+-1 (PSP~ 8-001)
t::========~ 11-----H
Zoning Designations :un:u Affordable Housing (AH) ******-** ~-I Specific Plan (SP)
Source(s): City of Ontario (09-05-2024), Esri , Nearmap Imagery (January 2025), San Bernardino County (2025) ~ 0 225 450 900
m-..-Feet
Figure 1-3
Existing Zoning Designations
1-7
4995

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
--------- \.._ ___ -_ -_ -_-_-_-_-_-_-_-_-_-_-_-------=-----=---- Ontario Rane
Busin_e_s_J 'paA -=----i-"'-1
(PSP1s!ooi
Specific Plan (SP)
Eucalyptus-Business-Park
Specific Plan
EUCALYl!TIJS AVE
South Ont~rio l:,.ogistics Center
(PSP19;.001)
~ I Merrill Comr:nerce Center
--------'-----'--(PSP18-001 )~---,
D Specific Plan Area
City of Ontario Overlays
Zoning Designations '******** H****** Aff or d a bl e H ousing • AH - '****-'l'*** I------ I Specific Plan (SP) ---
Source(s): City of Ontario (09-05-2024), Esri , Nearmap Imagery (January 2025), San Bernardino County (2025) Figure 1-4 Proposed Zoning Designations
1-8
~ 0 225 450 900
m-..-Feet
4996

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
2-1
CHAPTER 2

EXISTING CONDITIONS

2.1 Existing Assessor Parcel Numbers
At the time the Eucalyptus Business Park
Specific Plan was prepared, the Specific Plan
area consisted of the following Assessor Parcel
Numbers (APNs), as listed on Table 2-1,
Existing APN List, and shown on Figure 2-1,
Existing APNs.

Table 2-1 Existing APN List
1053-531-01 0216-321-01
1053-531-02 0216-321-02
1053-531-03 0216-321-06
1053-531-04 0216-321-07
1053-541-01 0216-322-01
1053-541-02 0216-322-02
1053-551-01 0216-322-10
1053-571-01
1053-571-02
1053-581-03
1053-581-04

2.2 Existing Land Use
As shown on Figure 2-2, Aerial Photograph, at
the time this Specific Plan was prepared, the
majority of the Specific Plan area was used for
dairy farming. The Specific Plan area
contained multiple dairy farms developed with
single-family residences, milking barns,
canopy/shade structures, and cattle pens.

Several man-made access roads cross the site
to provide access to the farms. Grass fields are
present in the southern area of the Specific
Plan area, which are used for grazing or
growing grass for hay and may have previously
been used to grow row crops. Additionally, the
northwestern portion of the Specific Plan area
contains light industrial uses and truck trailer
storage uses.

2.3 Surrounding Land Uses
As shown on Figure 2-3, Existing Surrounding
Land Uses, agricultural dairy farm uses and
rural residential homes abut the Specific Plan
area to the north, east, west, and southwest.

Light industrial and warehouse distribution
uses abut the Specific Plan area to the south
and southeast.

2.4 Existing Circulation and Access

2.4.1 Regional Circulation
State Route 60 (SR-60) is located
approximately 2.2 miles north of the Specific
Plan area and is accessible via the Grove
Avenue on- and off- ramp. State Route 83 (SR83) is located approximately 0.5 miles west of the Specific Plan area and is accessible via
Ontario Ranch Road and Eucalyptus Avenue.

Interstate 15 (I-15) is located approximately

4.5 miles east of the Specific Plan area and is
accessible via the Ontario Ranch Road onand off- ramp or the Limonite Avenue on- and off- ramp.

2.4.2 Local Circulation
Access to the Eucalyptus Business Park
Specific Plan area is provided from Eucalyptus
Avenue, Ontario Ranch Road, Campus
Avenue, Bon View Avenue, Grove Avenue, and
Walker Avenue. The City of Ontario designates
Eucalyptus Avenue as a truck route, which
provides truck access to the Specific Plan
area.
4997

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
2-2
Eucalyptus Avenue abuts the Specific Plan
area to the south and consisted of two paved
travel lanes at the time this Specific Plan was
prepared. The Ontario Policy Plan designates
Eucalyptus Avenue as a 4-lane Collector
Street.

Ontario Ranch Road is north of the Specific
Plan area and consisted of two paved travel
lanes at the time this Specific Plan was
prepared. The Ontario Policy Plan designates
Ontario Ranch Road as an 8-lane Principal
Arterial.

Campus Avenue abuts the Specific Plan area
to the west. At the time this Specific Plan was
prepared, no segments of Campus Avenue
abutting the Specific Plan had been
constructed. The Ontario Policy Plan
designates Campus Avenue as a 4-lane Minor
Arterial.

Bon View Avenue is a north-south oriented
street that traverses the western portion of the
Specific Plan area. At the time this Specific
Plan was prepared, Bon View Avenue
consisted of two paved travel lanes. The
Ontario Policy Plan designates Bon View
Avenue as a 2-lane Collector Street.

Grove Avenue is a north-south oriented street
that traverses the central portion of the
Specific Plan area. At the time this Specific
Plan was prepared, Grove Avenue consisted of
two paved travel lanes. The Ontario Policy Plan
designated Grove Avenue as a 4-lane Principal
Arterial.

Walker Avenue abuts the Specific Plan area to
the east. At the time this Specific Plan was
prepared, Walker Avenue consisted of two
paved travel lanes. The Ontario Policy Plan
designates Walker Avenue as a 2-lane
Collector Street.

2.5 Williamson Act
At the time this Specific Plan was prepared
(2025), two parcels within the Specific Plan
area had an active Williamson Act contract in
place (APNs: 0216-231-01 and 0216-321-
07). An application to cancel the contract is
required to be submitted to the City.

Cancellation would comply with provisions and
requirements identified at Government Code
§51280 et. seq. The City would be required to
make the required statutory findings. The
landowner would be required to pay the
requisite cancellation fee.
4998
10S3-S31-02 10S3-S41-02
10S3-S31-04 10S3-S41-01
10S3-S71-01
10S3S8103 10S3-S81-04
Source(s): Esri, Nearmap Imagery (October 2025), San Bernardino County (2025) 0 200 400 800
---Feet
1053-SS 1-01
10S3-5S1-01

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
0216-321-02
0216-321-01
Legend
CJ Specific Plan Area
0216-321-06
0216-321-07
0216-322-
Figure 2-1
Existing APNs
2-3
4999
Source(s): Esri, Nearmap Imagery (October 2025), San Bernardino County (2025) ~ 0 200 400
m-..-Feet
800

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Legend
CJ Specific Plan Area
Figure 2-2
Aerial Photograph
2-4
5000
Source(s): Esri, Nearmap Imagery (October 2025), San Bernardino County (2025) ~ 0 275 550 1,100
m-..-Feet

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Specific Plan Area
Figure 2-3
Existing Surrounding Land Uses
2-5
5001

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
2-6

2.6 Existing Physical Site Conditions

2.6.1 Topography
The Eucalyptus Business Park Specific Plan
area is relatively flat and slopes slightly to the
south with an approximate elevation ranging
from 690 feet above mean sea level (AMSL) to
665 feet AMSL. The current conditions of the
Specific Plan area is illustrated in Figure 2-2,
Aerial Photograph, and the existing
topographic conditions for the Specific Plan
area are illustrated in Figure 2-4, USGS
Topographic Map.

2.6.2 Hydrology
At the time the Specific Plan was prepared, the
Specific Plan area consisted of dairy farms and
undeveloped areas. The existing topography is
relatively flat with a north-to-south sheet flow
drainage pattern. The Specific Plan area is
located within three City of Ontario Master
Drainage Plan areas, including Area XII-1,
Area XIII-1, Area XIV-1 and Area XIV-2. The
EIR prepared in association with the Specific
Plan includes a detailed hydrology analysis for
the Specific Plan area.

2.6.3 Geology and Soils
Based on information provided from the
Environmental Data Report (EDR) Radius Map
report, the surficial geology within Eucalyptus
Business Park Specific Plan area contains
unconsolidated and semi-consolidated
quaternary age alluvium, lake, playa, and
terrace deposits. Soil within the Specific Plan
area contains Tujunga loamy sand, Hilmar
loamy fine sand, Grangeville fine sandy loam,
and Chino silt loam.

From a seismic perspective, the Specific Plan
area is not located within an Alquist-Priolo
Earthquake Fault Zone. The possibility of
significant fault rupture within the Specific Plan
area is considered low.

2.6.4 Vegetation and Biological Resources
Due to past and existing land uses, no native
plant communities or natural communities of
special concern are present within or adjacent
to the Eucalyptus Business Park Specific Plan
area. The EIR prepared in association with the
Specific Plan includes a detailed evaluation of
biological resources.

2.6.5 Existing Ground Water Wells
Upon development of the well site areas, these
wells, or any other wells found on the property,
will be abandoned per California Department
of Water Resources Health Guidelines and the
City of Ontario Guidelines. In compliance with
the Chino Basin Watermaster’s Well Procedure
for Developers, documentation that a well
use/destruction plan and schedule for all
existing private/ agricultural wells is required to
be submitted to the City of Ontario prior to any
construction activities. If a private well is
actively used for water supply, the Developer
shall submit a plan to abandon such well and
connect users to the City’s water system when
available.

Wells shall be destroyed/ abandoned per the
California Water Resource Guidelines and
require permitting from the County Health
Department. Documentation that the well
abandonment process is underway shall be
provided to the Engineering Department and
the Ontario Municipal Utilities Company at the
time of a grading permit and/or building permit
being issued for the affected property. If the
Developer proposes temporary use of an
existing agricultural well for purposes other
than agriculture, such as grading, dust control,
etc., the Developer shall make a formal request
to the City of Ontario for such use prior to the
issuance of permits for any construction
activity. Upon approval, the Developer shall
enter into an agreement with the City of
Ontario and pay any applicable fees as set
forth by the agreement. Refer to Figure 2-5,
5002

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
2-7
Existing Water Wells, for locations of water
wells within the Specific Plan area. Existing
wells may be converted to groundwater
monitoring wells if feasible, at the City’s
discretion.

2.6.6 Existing NPDES Compliance
In the existing conditions, NPDES
requirements are enforced under the
Agricultural Permit issued by the State Water
Resources Control Board.
5003
Source(s): Esri, Michael Baker (March 2025), USGS (2013) ~ 0 200 400
m
800
Feet

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Legend
D Specific Plan Area
Figure 2-4
USGS Topographic Map
2-8
5004
Source(s): Esri, Nearmap Imagery (October 2025), San Bernardino County (2025) 0 200 400 800
---Feet

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
D Specific Plan Area
~ Existing Water Wells
I I J J I t
' ' ' I r I I I I
.. r
Figure 2-5
Existing Water Wells
2-9
5005

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
3-1
CHAPTER 3

LAND USE

3.1 Vision
The Eucalyptus Business Park Specific Plan
area is envisioned as a dynamic employment
hub within a thoughtfully designed, masterplanned environment along with a public parkland area intended to support passive
recreation needs for the surrounding
residents. It is situated in the southern portion
of the City of Ontario, at the heart of one of
Southern California’s most robust logistics and
business corridors. The location is ideally
positioned to support a wide range of business
park and employment-generating uses. With
strategic proximity to major freeways, regional
airports, and the Ports of Los Angeles and
Long Beach, the Eucalyptus Business Park
Specific Plan area offers unparalleled access
to regional, national, and international markets.

The Eucalyptus Business Park Specific Plan is
designed to foster long-term economic
growth, support business innovation, and
provide high-quality jobs, contributing to the
vitality of the local community and the broader
Inland Empire region.

3.2 Land Use Plan
This Specific Plan establishes two land use
designations: Business Park and Open Space
– Parkland. For planning purposes, as shown
on Figure 3-1, Conceptual Land Use Plan, and
Table 3-1, Land Use Plan Statistical Summary,
the Specific Plan will establish nine planning
areas to provide for the development of a
189.0‐acre site with up to 2,939,000 square
feet (SF) of Business Park floor space on
137.90 acres at a maximum allowed floor area
ratio (FAR) of 0.55 and 35.88 acres of Open
Space – Parkland. The remaining 15.24 acres
are designated for roadway improvements.

Table 3-1 Land Use Plan Statistical Summary
PA Land Use Acres Maximum Buildout SF
Business Park
1 Business Park 7.70 162,600
2 Business Park 18.33 273,700
3 Business Park 18.21 340,700
4 Business Park 18.19 423,200
5 Business Park 37.76 859,300
6 Business Park 37.71 879,500
Business Park Totals 137.90 AC 2,939,000 SF
Open Space – Parkland
7 Open Space –
Parkland 8.00
--
8 Open Space –
Parkland 13.99 --
9 Open Space –
Parkland 13.89 --
Total Open-Space
Parkland Acreage 35.88 AC
--
-- Roadway 15.24 --
Total 189.0 AC 2,939,000 SF
Notes:

1. A maximum of 10,000 SF total of Commercial uses may be provided within the Business Park Planning Areas 1, 2, 3, 4, 5, and/or

6. 2. A publicly operated animal resource center site (35,000 SF) may be provided within the Business Park Planning Areas 1, 2, 3, 4, 5, 6, 7, 8, or 9. The final size and location of the animal resource center site is subject to the approval by the City of Ontario.

3. Total acreage of 189.0 is rounded up to the nearest one-tenth of an acre.

4. The Specific Plan allows the transfer of development square footage (15 percent or less) within the same land use designation, provided that the shift in square footage would not exceed the maximum allowable overall square footage (2,939,000) and the maximum building FAR (0.55).
5006

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
3-2

3.2.1 Business Park
Encompassing 137.90 acres in the southerly
portion of the Specific Plan area along its
frontage with Eucalyptus Avenue, Planning
Areas 1 through 6 are designated Business
Park. Up to 2,939,000 SF of building space are
permitted across Planning Areas 1 through 6.

The Business Park land use designation
intends to provide for uses such as employee‐
intensive office spaces, technology centers,
research and development facilities,
warehouse and distribution, and light
manufacturing. Primary vehicular access is
planned within Eucalyptus Avenue, Public
Street ‘A’, Campus Avenue, Bon View Avenue,
Grove Avenue, and Walker Avenue. The
Specific Plan also allows a maximum total of
10,000 SF of commercial uses within the
Business Park planning areas to support the
Business Park operations and a potential
35,000 SF publicly operated animal resource
center.

The Specific Plan allows the transfer of
development square footage (15 percent or
less) within the same land use designation,
provided that the shift in square footage would
not exceed the maximum allowable overall
square footage (2,939,000) and the maximum
building FAR (0.55).

3.2.2 Open Space – Parkland
Encompassing 35.88 acres in the northerly
portion of the Specific Plan area along its
frontage with Public Street ‘A’, Planning Areas
7, 8, and 9 are designated Open Space –
Parkland. The Open Space – Parkland
planning areas intend to provide passive
recreational facilities, such as open space
areas, benches, and trails.

3.3 Airport Influence Compliance
The Specific Plan area is located within the
Ontario International Airport (ONT) Influence
Area (AIA), and it is located outside any
identified safety, airspace protection, and
noise impact zones. All properties located
within the ONT AIA are subject to a real estate
transaction disclosure notice.

The Specific Plan area is also located within
the Chino Airport (CNO) AIA. The San
Bernardino County Comprehensive Land Use
Plan for Chino Airport was adopted in 1991
and does not reflect guidance set forth in the
2011 Caltrans Airport Land Use Planning
Handbook. As such, in 2022, the City of
Ontario adopted the CNO Overlay District
which provides maps, criteria, and policy
language to guide development within the
Chino AIA consistent with the 2011 Caltrans
Airport Land Use Planning Handbook.

As illustrated in Figure 3-2, Chino Safety
Zones, the majority of the Specific Plan area is
located within CNO Safety Zone 5 (low risk),
with a very small portion of the southeastern
corner located within Safety Zone 4 (moderate
risk).

Development within the land use compatibility
zones may have building height, land use, and
floor area ratio (FAR) limitations and is subject
to open land requirements. For further details,
refer to Chapter 5, Development Regulations,
as well as the ONT and CNO Airport Land Use
Compatibility Plans.

3.4 Conceptual Site Plan
Figure 3-3, Conceptual Site Plan, depicts a
potential layout of the Specific Plan area. The
final building configurations, sizes, and
orientation will be determined during the
Development Plan review process.

The conceptual site plan reflects current
market trends, site conditions, and planned
infrastructure. The conceptual site plan may be
modified provided it does not exceed the
maximum square footage provided in the
5007

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
3-3
Specific Plan’s Conceptual Land Use Plan and
complies with this Specific Plan and applicable
provisions of the City of Ontario’s Development
Code.
5008
I
....
:s ~ <( <(
"' ,:; ~ ~ ~: PA4 ~
01 BUSINESS PARK 0
., 18.19AC.

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
~ <(
~
PAS ~ BUSINESS PARK ~

37.76AC.

PA Land Use Acres Target Buildout (S.F.)
1 Business Park 7.70 162,600
2 Business Park 18.33 273,700
3 Business Park 18.21 340,700
4 Business Park 18.19 423,200
5 Business Park 37.76 859,300
6 Business Park 37.71 879,500
7 Open Space - Parkland 8.00
8 Open Space - Parkland 13.99
9 Open Space - Parkland 13.89
Roadway 15.24 --
Totals 189.0 2,939,000 * Potential Publicly Operated Animal Resource Center

1. A maximum of 10,000 s.f. total of Commercial uses may be provided within the Business Park Planning Areas 1, 2, 3, 4, 5, and 6.

2. A publicfy operated animal resource center may be provided within the Business Park and Open Space - Parkland Planning Areas. The animal resource center shall not exceed 35,000 s.f.

3. The Specific Plan allows the transf er of development square footage /15 percent or less) within the same land use designation, provided that the shift in square f ootage would not exceed the maximum af/owable overafl square f ootage (2,939,000) and the maximum building FAR (0.55). ------,
~ <(
PA6 •!;:! "'

BUSINESS PARK

37.71 AC. i~
Source(s): ESRI, Nearmap Imagery (January 2025), Michael Baker (11-20-2025) Figure 3-1 ~ o
m-..-Feet
200 400 800 Conceptual Land Use Plan
3-4
5009
I
f
II\O: AVE
I EB~. r---------r--11~1~~h=-======CK=::::IC=--~~--= r::::::.== = =:,,. = ::::IC = ::ic:;i===I ~ • ~-1-~~-+----1rt-~ f----~~--- ----ll, -1-
ill§
;'iL]t"a EUCALYPTUS-A:

Hll i1i
I:~!
Chi o
,.;>
Source(s): Riverside County Planning Commission Staff Report (06-28-2022) B~ mw__-m•

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Chino Safety Zones
- Zone 1
Zone 2
Zone 3
- Zone4
Zone 5
Figure 3-2
Chino Safety Zone
3-5
5010

OPEN SPACE

CONNECTION

TO WEST STREET
·ttt.0-ltt.C".!l::lt ........................... ,. ........ iiNOT APART OPEN SPACc -PARK!AND
11Ul.01NG1' -~
PHASE 3
Source(s): RGA (12-1 6-2025)
IJffll ~ffit'§IIII
w

NOT APART
OPEN SPACE -PARKlAND
80LOIIGI llUl.OIIIGI
-- -- . . ' ' . '
PHASE 2

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
""-""" SSU34SF

NOT APART
OPEN SPACc -PARKLAND
PHASE 1
I
'11
I Ii
!1

OPEHSPACE
COltlECTION

TO EAST STREET
Figure 3-3
Conceptual Site Plan
3-6
5011

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-1
CHAPTER 4

INFRASTRUCTURE PLAN

4.1 Circulation and Access Plan
The Eucalyptus Business Park SpeciÞc Plan
Circulation and Access Plan provides direct,
safe, and convenient access for visitors,
employees, and commercial vehicles including
trucks to and from the SpeciÞc Plan area.

Components of the SpeciÞc Plan’s Circulation
and Access Plan are discussed and illustrated
below.

4.1.1 Vehicular Circulation
Direct access to the Eucalyptus Business Park
SpeciÞc Plan area is provided by Campus
Avenue from the west, Eucalyptus Avenue
from the south, and Walker Avenue from the
east. Additionally, Bon View Avenue and Grove
Avenue provide access through the SpeciÞc
Plan area in the north-south orientation. The
SpeciÞc Plan proposes to provide an internal
east-west oriented Public Street ‘A’ through the
SpeciÞc Plan area to connect Campus Avenue
and Walker Avenue. Public Street ‘A’ will
provide a separation between the Business
Park land uses and the Open Space –
Parkland land uses.

The installation of trafÞc controls (trafÞc signals
and stop signs) and the location and
orientation of private driveways serving
individual buildings and uses will be
determined as part of implementing
development plans. Additional right-of-way
may be required to accommodate additional
left turn lanes at intersections based on
required queue lengths per the TrafÞc Impact
Analysis/SpeciÞc Plan EIR.

Figure 4-1, Existing Vehicular Circulation and
Access Plan, provides the City’s proposed
ultimate roadway buildout within the SpeciÞc
Plan area, and Figure 4-2, Conceptual
Vehicular Circulation and Access Plan,
illustrates the vehicular circulation plan within
the SpeciÞc Plan area. Final intersection
spacing, intersection right-of-way (ROW), and
trafÞc controls must conform to the Þndings of
the associated trafÞc impact analysis and to
City standards. All right-of-way/easements
necessary to construct the required public
improvements shall be obtained to the extent
feasible.

The following pages describe and illustrate the
primary components of the Eucalyptus
Business Park SpeciÞc Plan’s vehicular
circulation network. Existing interim striping
shall be removed along existing frontage
streets. Refer to Chapter 7, Implementation
Plan, for additional circulation improvement
standards pertaining to phasing.
5012
PA7

OPEN SPACE

8.OOAC.

I PA 1
~ BUSINESS PARK ~
~ 7.7OAC. <(
"' i ' ! PA4 ~
BUSINESS PARK ~ I 18.19AC.

PA2

BUSINESS PARK

18.33 AC.

PAS

BUSINESS PARK

37.76AC.

Specific Plan Area
Principal Arterial (8 Lanes)

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
PA9

OPEN SPACE

13.89AC.

PA3

BUSINESS PARK

18.21 AC.

PA6

BUSINESS PARK

37.71 AC.
- - • Minor Arterial (4 Lanes)
Collector Street (4 Lanes)
~ <(
;
i
Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (11-20-2025), San Bernardino County (2025), City of Ontario (10-20-2016) Figure 4-1 0 200 400 800
---Feet
Existing Vehicular Circulation and Access Plan
4-2
5013
0 6
Specific Plan Area
Traffic Signal
Potential Signal Location
Full Movement Driveway
Right-In/Right-Out Driveway
Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (04-01 -2026), San Bernardino County (2025) 0 200 400 800
---Feet

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Note: Additional traffic signals may be required based
on locations of future access points and as identified
in the Traffic Impact Analysis/Specific Plan EIR. Driveway locations shown herein are only conceptual. Final driveways to be determined during the entitlement process.

Ontario Ranch Rd (160' ROW - Principal Arterial)
Grove Avenue ( 124' ROW - Principal Arterial)
Eucalyptus Avenue (108' ROW - Collector)
Campus Avenue (108' ROW - Minor Arterial)
Walker Avenue (88' ROW - Collector)
Bon View Avenue (66' ROW - Collector)
Public Street 'A' (64' ROW - Local Street)
Figure 4-2
Conceptual Vehicular Circulation and Access Plan
4-3
5014

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-4
A. Campus Avenue (108’ ROW Minor
Arterial)
Campus Avenue forms the western boundary
of Planning Areas 1, 4, and 7. At the time this
SpeciÞc Plan was prepared, no segments of
the ROW abutting the SpeciÞc Plan area had
been constructed. This public roadway will
provide access to the SpeciÞc Plan area from
off-site areas to the north and south.

As shown on Figure 4-3, Street Sections –
Campus Avenue, Bon View Avenue, and
Grove Avenue, the developer(s) of the
Eucalyptus Business Park SpeciÞc Plan area
will be responsible for constructing the eastern
78 feet out of the total 108-foot-wide ROW.

The 78 feet of improvement includes 59 feet of
paved roadway, a 12-foot-wide parkway that
includes 7 feet of curb-adjacent landscaping
and a 5-foot-wide sidewalk. The remaining
western portions of the Campus Avenue ROW
will be constructed by others and include 18
feet of paved roadway and a 12-foot-wide
parkway containing 7 feet of curb-adjacent
landscaping and a 5-foot-wide sidewalk.

Beyond the Campus Avenue ROW, a 23-footwide landscape buffer abuts both the eastern and western sides of the ROW. Developer(s) of
the SpeciÞc Plan area will be responsible for
constructing the eastern landscape buffer
inclusive of an 8-foot-wide multi-purpose trail.

A trafÞc signal will be located at the
intersection of Campus Avenue and
Eucalyptus Avenue by developer(s) within the
SpeciÞc Plan area and a potential trafÞc signal
may be installed at the intersection of Campus
Avenue and Public Street ‘A’. TrafÞc signal
locations are subject to change based on the
results and recommendations of a trafÞc study.

All improvements to Campus Avenue are
required to comply with applicable City of
Ontario requirements, including sight distance
requirements.

Final driveway locations along Campus
Avenue will be determined in conjunction with
the design of implementing development
projects, in accordance with Chapter 2.0
Access Guidelines of the City of Ontario’s
TrafÞc and Transportation Design Guidelines.

B. Bon View Avenue (66’ ROW Collector)
Bon View Avenue forms the eastern boundary
of Planning Areas 1, 4, and 7 and the western
boundary of Planning Areas 2, 5, and 8. This
public roadway provides access to the SpeciÞc
Plan area from off-site areas to the north and
south.

As shown on Figure 4-3, Street Sections –
Campus Avenue, Bon View Avenue, and
Grove Avenue, the developer(s) of the
Eucalyptus Business Park SpeciÞc Plan area
will be responsible for constructing the entire
width of the 66-foot-wide ROW. The 66 feet of
improvement includes 48 feet of paved
roadway and a 9-foot-wide parkway on both
sides of the street that includes 4 feet of curbadjacent landscaping and a 5-foot-wide sidewalk.

Beyond the Bon View Avenue ROW, a 20-footwide storm drain easement abuts the eastern side of the ROW. Easement width requirement
is subject to change based on Þndings of Cityapproved hydraulic studies, master plan updates, and project Þnal designs.

Developers outside of the SpeciÞc Plan area
are constructing a trafÞc signal at the
intersection of Bon View Avenue and
Eucalyptus Avenue and a potential trafÞc
signal may be installed at the intersection of
Bon View Avenue and Public Street ‘A’. If the
trafÞc signal improvements are not completed
and accepted by the City, developer(s) of this
SpeciÞc Plan area is subject to the trafÞc signal
improvements required. All improvements to
Bon View Avenue are required to comply with
applicable City of Ontario requirements,
5015

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-5
including sight distance requirements. Due to
utility constraints, Bon View Avenue may need
to be constructed as a tilt section.

Final driveway locations along Bon View
Avenue will be determined in conjunction with
the design of implementing development
projects, in accordance with Chapter 2.0
Access Guidelines of the City of Ontario’s
TrafÞc and Transportation Design Guidelines
and to the satisfaction of the City Engineer.

C. Grove Avenue (124’ ROW Principal
Arterial)
Grove Avenue forms the eastern boundary of
Planning Areas 2, 5, and 8 and the western
boundary of Planning Areas 3, 6, and 9. This
public roadway provide access to the SpeciÞc
Plan area from off-site areas to the north and
south.

As shown on Figure 4-3, Street Sections –
Campus Avenue, Bon View Avenue, and
Grove Avenue, the developer(s) of the
Eucalyptus Business Park SpeciÞc Plan area
will be responsible for constructing the entire
width of the 124-foot-wide ROW. The 124 feet
of improvement includes a 28-foot-wide raised
center median, and 56 feet of paved roadway
and a 20-foot-wide parkway on both sides of
the street. The 20-foot-wide parkway on the
western side of the ROW provides 7 feet of
curb-adjacent landscaping, a 5-foot-wide
sidewalk and an additional 8 feet of
landscaping on the west side of the sidewalk.

The 20-foot-wide parkway on the eastern side
of the ROW provides 7 feet of curb-adjacent
landscaping, a 5-foot-wide sidewalk, 5 feet of
additional landscaping, and an 8-foot-wide
multi-purpose trail.

Beyond the Grove Avenue ROW, a 20-footwide landscape buffer abuts both the eastern and western sides of the ROW.

The trafÞc signal at the intersection of Grove
Avenue and Eucalyptus Avenue will be
constructed by others, as part of adjacent
development to the south. A potential trafÞc
signal may be installed at the intersection of
Grove Avenue and Street ‘A”. If the trafÞc
signal improvements are not completed and
accepted by the City, developer(s) of this
SpeciÞc Plan area is subject to the trafÞc signal
improvements required. TrafÞc signal locations
are subject to change based on the results and
recommendations of a trafÞc study. All
improvements to Grove Avenue are required to
comply with applicable City of Ontario
requirements, including sight distance
requirements.

Final driveway locations along Grove Avenue
will be determined in conjunction with the
design of implementing development projects,
in accordance with Chapter 2.0 Access
Guidelines of the City of Ontario’s TrafÞc and
Transportation Design Guidelines and to the
satisfaction of the City Engineer.
5016
23'

LANDSCAPE

BUFFER/NEIGHBORHOOD EDGE I
I
I
I
I
20·

LANDSCAPE BUFFER/

NEIGHBORHOOD EDGE
JJ ~

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
PROP EX. EX. PROP

W'LY W'LY C/L E'LY E'LY

R/W R/W R/W R/W ESMT
I I I
154' I I 108' R/W
54' I
I I EX. 25' R/W EX. 25' R/W
24' 12' 23'
PARKWA 1 1 LANDSCAPE
I I : BUFFER/NEIGHBORHOOD EDGE
7' 5• I I 8' I
I
84'
35' ,__,~,,,....---~----,sw; MULTI PURPOSE
5' I 7' 17' I
~-~: ~ '""--'II_ i~-~- ~ ~2G%~~e:a:z~~~2~%~ ~~~:c~~~ ;!;!~:.r--JJ

GUTTER AC DIKE AC PAVEMENT
35'

NEIGHBORHOOD EDGE
PROP.

W'LY
R/W
EX. W'LY
R/W
PARKWAY I -j! 4'
EX.

W'LY
R/W

CAMPUS AVENUE
SCALE: 1"=30'
108' ROW - MINOR ARTERIAL
33' 33'
48'
24' 24'

BON VIEW AVENUE
SCALE: 1"=30'
66 ROW - COLLECTOR
C/L
124' R/W
EX.

E'LY
R/W
g•

PARKWAY
4• 5• I
swr
EX.

E'LY
R/W
ESMT
I 20· STORM DRAIN ESMT I
I
I
PROP.

E'LY
R/W
ESMT t------+--------------+------< I EX. 33' R/W EX. 33' R/W I ~ ~ I
28'
28' 14' 14' 28'

RAISED I MEDIAN

AC PAVEMENT AC PAVEMENT

GROVE AVENUE
SCALE: 1"=30'
124' ROW - PRINCIPAL ARTERIAL
20·

LANDSCAPE BUFFER/

NEIGHBORHOOD EDGE
Source(s): Michael Baker International (04-01-2026) Figure 4-3 Street Sections -
Campus Avenue, Bon View Avenue, and Grove Avenue
4-6
5017

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-7
D. Walker Avenue (88’ ROW Collector)
Walker Avenue forms the eastern boundary of
Plannings Areas 3, 6, and 9. This public
roadway provides access to the SpeciÞc Plan
area from off-site areas to the north and south.

As shown on Figure 4-4, Street Sections –
Walker Avenue, Eucalyptus Avenue, and
Public Street ‘A’, the developer(s) of the
Eucalyptus Business Park SpeciÞc Plan area
will be responsible for constructing the western
69 feet out of the total 88-foot-wide ROW. The
69 feet of improvement includes 57 feet of
paved roadway and a 12-foot-wide parkway
that includes 7 feet of curb-adjacent
landscaping and a 5-foot-wide sidewalk. The
remaining eastern portions of Walker Avenue
ROW will be constructed by others and include
7 feet of paved roadway, a 12-foot-wide
parkway containing 7 feet of curb-adjacent
landscaping and 5-foot-wide sidewalk, and an
8-foot wide Multi Purpose Trail located outside
of the right-of-way.

A 23-foot-wide landscape buffer abuts both
the east and west sides of the Walker Avenue
ROW. Within the eastern landscape buffer,
developers outside of the SpeciÞc Plan area
will be responsible for constructing an 8-footwide multi-purpose trail.

The trafÞc signal at the intersection of Walker
Avenue and Eucalyptus Avenue will be
constructed by others as part of adjacent
development to the south. A potential trafÞc
signal may be installed at the intersection of
Walker Avenue and Public Street ‘A’. If the
trafÞc signal improvements are not completed
and accepted by the City, developer(s) of this
SpeciÞc Plan area is subject to the trafÞc signal
improvements required. All improvements to
Walker Avenue are required to comply with
applicable City of Ontario requirements,
including sight distance requirements.

Developers shall design and construct
concrete pavements on Walker Avenue
southbound approaches at Eucalyptus Avenue
in accordance with City of Ontario standard
drawing #1207 as Walker Avenue will be
designated as a truck route.

Final driveway locations along Walker Avenue
will be determined in conjunction with the
design of implementing development projects,
in accordance with Chapter 2.0 Access
Guidelines of the City of Ontario’s TrafÞc and
Transportation Design Guidelines and to the
satisfaction of the City Engineer.

E. Eucalyptus Avenue (108’ ROW Collector)
Eucalyptus Avenue forms the southern
boundary of Planning Areas 4, 5, and 6. This
public roadway provides access to the SpeciÞc
Plan area from off-site areas to the east and
west.

As shown on Figure 4-4, Street Sections –
Walker Avenue, Eucalyptus Avenue, and
Public Street ‘A’, Eucalyptus Avenue will
provide 84 feet of paved roadway, which
includes a 14-foot-wide painted median. A 12-
foot-wide parkway that includes 7 feet of curbadjacent landscaping and a 5-foot-wide sidewalk is provided on both sides of the
street. Beyond the ROW, a 23-foot-wide
landscape buffer abuts both sides of
Eucalyptus Avenue. Additionally, an 8-footwide multi-purpose trail is provided within the northern landscape buffer.

Developer(s) within the Eucalyptus Business
Park SpeciÞc Plan area west of Grove Avenue
will be responsible for constructing the
northern 16 feet of paved roadway, the 12-
foot-wide parkway, and the 8-foot-wide multipurpose trail. Developer(s) within the Eucalyptus Business Park SpeciÞc Plan area
east of Grove Avenue will be responsible for
constructing the 12-foot-wide parkway and the
8-foot-wide multi-purpose trail. The remaining
portions of Eucalyptus Avenue, as illustrated in
Figure 4-4, will be constructed by developer(s)
5018

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-8
outside of the SpeciÞc Plan area. Developer(s)
shall design and construct concrete pavement
at all intersection approaches in accordance
with City of Ontario Standard Drawing No.
1207, as Eucalyptus Avenue will be
designated as a truck route.

The trafÞc signals along Eucalyptus Avenue at
its intersections with Bon View Avenue, Grove
Avenue, and Walker Avenue will be
constructed by others, as part of adjacent
development to the south. If the trafÞc signal
improvements are not completed and
accepted by the City, developer(s) of this
SpeciÞc Plan area is subject to the trafÞc signal
improvements required. Developer(s) within
the SpeciÞc Plan area will be responsible for a
trafÞc signal at the intersection of Eucalyptus
Avenue and Campus Avenue. TrafÞc signal
locations are subject to change based on the
results and recommendations of a trafÞc study.

All improvements to Eucalyptus Avenue are
required to comply with applicable City of
Ontario requirements, including sight distance
requirements.

Final driveway locations along Eucalyptus
Avenue will be determined in conjunction with
the design of implementing development
projects, in accordance with Chapter 2.0
Access Guidelines of the City of Ontario’s
TrafÞc and Transportation Design Guidelines
and to the satisfaction of the City Engineer.

F. Public Street ‘A’ (64’ ROW Local Street)
Public Street ‘A’ forms the northern boundary
of Planning Areas 1, 2, and 3 and the southern
boundary of Planning Areas 7, 8, and 9. This
public roadway provides access to the SpeciÞc
Plan area from off-site areas to the east and
west.

As shown on Figure 4-4, Street Sections –
Walker Avenue, Eucalyptus Avenue, and
Public Street ‘A’, implementing projects within
the Eucalyptus Business Park SpeciÞc Plan
area will be responsible for constructing the
entire width of the 64-foot-wide ROW. The 64
feet of improvement includes 40 feet of paved
roadways and a 12-foot-wide parkway on both
sides of the street that includes 7 feet of curb
adjacent landscaping and a 5-foot-wide
sidewalk. Notwithstanding the above, Street ‘A’
may require additional roadway width at
intersections with north–south streets to
accommodate truck turning movements
associated with the Business Park uses.

Accordingly, the right-of-way and paved
roadway width for Street A may be increased
at intersections, as determined necessary
through implementing projects, subject to City
review and approval.

A trafÞc signal may be required at the
intersection of Public Street ‘A’ and Grove
Avenue, Public Street ‘A’ and Campus Avenue,
Public Street ‘A’ and Bon View Avenue, and
Public Street ‘A’ and Walker Avenue. TrafÞc
signal locations are subject to change based
on the results and recommendations of a
trafÞc study. All improvements to Public Street
‘A’ are required to comply with applicable City
of Ontario requirements, including sight
distance requirements.

Final driveway locations along Public Street ‘A’
will be determined in conjunction with the
design of implementing development projects,
in accordance with Chapter 2.0 Access
Guidelines of the City of Ontario’s TrafÞc and
Transportation Design Guidelines and to the
satisfaction of the City Engineer.

G. Private Drive Aisles
Private drive aisles connect individual planning
areas to the public roadways described above.

Within each planning area, private drive aisles
provide vehicular access for automobiles and
commercial vehicles including trucks to
parking lots and loading areas and provide
sidewalk opportunities for pedestrian and
bicycle access to building entries and
5019

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-9
amenities. Private drive aisles will have
pavement widths that range between 24 and
50 feet. Private drive aisles are not depicted on
Figure 4-2 as their locations, alignments, and
widths will be determined in conjunction with
the design of implementing development
projects.

H. Truck Routes
Access to the Eucalyptus Business Park
SpeciÞc Plan area is provided from Eucalyptus
Avenue, Campus Avenue, Bon View Avenue,
Grove Avenue, Walker Avenue, and Public
Street ‘A’. Project truck trafÞc shall use the
City’s truck route in Euclid Avenue, Walker
Avenue, Eucalyptus Avenue, and Merrill
Avenue to access the SpeciÞc Plan area.
5020
23'

LANDSCAPE

BUFFER/NEIGHBORHOOD EDGE
3:1
MAX
t'iLY ESMT R/W
I I
PROP. EX. W'LY W'LY

R/W R/W
I I
21'
12'
7'
r<fr
R/W
!
I
16' 1

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
It
44' 88' IR/W 44'
EX. 33' R/W EX. 33' R/W

WALKER AVENUE
sr.ALE: 1"=30'
88' ROW - COLLECTOR (TRUCK ROUTE)
108'fR/W
54' i 54'
42' 42'
33'
EX. FUT. E'LY E'LY

R/W R/W ESMT
I I I
s'i:v
R/W
12' I AAKWAY1
TO BE CONSTRUCTED BY OlHERS
26'
23'

I LANDSCAPE

I BUFFER/NEIGHBORHOOO EDGE
I
I
I
PAl~D I M~plAN 7' I
J_J ,-~~ ~~~ ~-.?J-~- 2ll _ J_ =i= j_ 2% = =:i;,l--~ ............ .wi AC PAVEMENT ' CURB AND J ii--e===~~-i 35'

NEIGHBORHOOD EDGE CURB AND I GUTTER GUTTER

EUCALYPTUS AVENUE (WEST OF GROVE)
SCALE: 1"=30'
108' ROW - COLLECTOR (TRUCK ROUTE)
PROP. EX. N'LY N'LY EX. S'LY
R/W
I Er T-----=-2,_1'_-1T 54' 108.flR/W 54'
23' : : 12' 42' 42' 23'

EUCALYPTUS AVENUE (EAST OF GROVE)
sr.ALE: 1 "=30'
108' ROW - COLLECTOR (TRUCK ROUTE)
PROP. PROP.

N'LY R/W
I 32' 32'

S'LY R/W
I 20' 20'

STREET 'A' (PUBLIC)
sr.ALE: 1 "=30'
64' ROW - LOCAL STREET
Source(s): Michael Baker International (04-01-2026) Figure 4-4 Street Sections -
Walker Avenue, Eucalyptus Avenue, and Public Street 'A' Ef'l'lJ Affltw IIEII 4-10
5021

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-11

4.1.2 Non-Vehicular Circulation
The Eucalyptus Business Park SpeciÞc Plan
encourages non-motorized circulation for
employees and visitors of the SpeciÞc Plan
area. Pedestrian circulation is encouraged
within the SpeciÞc Plan area through a network
of sidewalks and multi-purpose trails, and
bicycle circulation is encouraged through a
network of bike lanes and multi-purpose trails.

Additional pedestrian and bicycle facilities will
be designed on individual business park
building sites at the time buildings are
designed and positioned in each planning area
as part of implementing development projects.

Additional pedestrian and bicycle facilities
within Planning Areas 7, 8, and 9 will be
designed consistent with the City of Ontario
Grand Park Master Plan.

As shown on Figure 4-5, Conceptual NonVehicular Circulation and Mobility Plan, the Eucalyptus Business Park SpeciÞc Plan
provides for sidewalk in the public ROW along
Bon View Avenue and Public Street ‘A’;
sidewalk and multi-purpose trail along Grove
Avenue; and sidewalk, Class II bikeway, and
multi-purpose trail along Eucalyptus Avenue,
Campus Avenue, and Walker Avenue (to be
constructed by others). Pedestrian crosswalks
are designed at street intersections to ensure
pedestrian safety. Locations of pedestrian
crosswalks are provided on Figure 4-5.

As illustrated on Figure 4-5, 5-foot-wide
sidewalks are provided on both sides of
Campus Avenue, Bon View Avenue, Grove
Avenue, Walker Avenue, Eucalyptus Avenue,
and Public Street ‘A’; an 8-foot-wide multipurpose trail is provided on Eucalyptus Avenue, Campus Avenue, Grove Avenue and
Walker Avenue; and Class II bike lanes are
provided along Eucalyptus Avenue, Campus
Avenue, and Walker Avenue. Construction of
the non-vehicular network will be provided by
developers both within and outside of the
SpeciÞc Plan area. Responsibility of
construction is illustrated in Figures 4-3 and 4-
4 of this SpeciÞc Plan.

The Eucalyptus Business Park SpeciÞc Plan
anticipates a large volume of passenger
vehicle and truck trafÞc circulating on the site;
therefore, convenient and safe pedestrian and
bicycle access was given careful consideration
when preparing the design standards of this
SpeciÞc Plan. Provisions for sidewalks, shortterm and long-term bicycle storage facilities, and employee and visitor gathering areas
interior to the planning areas are set forth in
Chapter 6, Design Guidelines, of this SpeciÞc
Plan.

In addition to internal non-vehicular circulation,
Omnitrans provides bus services to and from
the SpeciÞc Plan area. The following bus and
transit facilities are located west and north of
the SpeciÞc Plan area:
• Omnitrans Bus Route 83, located
approximately 0.6 miles to the west along
Euclid Avenue.
• Omnitrans Bus Route 87, located
approximately 1.8 miles to the north along
Riverside Drive.
• As part of the SpeciÞc Plan, a new bus
turnout would be constructed near the
intersection of Grove Avenue and
Eucalyptus Avenue in anticipation of future
Omnitrans service.
5022

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
ions of the non-vehicular access along
Avenue, Eucalyptus Avenue, and Walker
ill be constructed by developers outside
------- PA7

OPEN SPACE OPEN SPACE
ecific Plan are

OPEN SPACE
~ ~~ ,~~ 13.89 AC.
~i,----------=p--=- A-1---~Ur---------=p=-=A---=2=---- PA 3 ' BUSINESS PARK BUSINESS PARK BUSINESS PARK ~• 7.70AC. ;\: 18.33AC. "' 18.21AC. ~l-----~~----<' l------------==-'-'=----------------l ~ l--------~~~-------------1 ~ :s: )I:

I: PA 4 ~ PA 5 I ol BUSINESS PARK ~ BUSINESS PARK ~ 18.19AC. 37.76AC. - - ~ ----------
Legend
r---,
: __ _1 Specific Plan Area

EUCALYPTUS AVE
Sidewalk Only
PA6

BUSINESS PARK

37.71 AC.
~ Pedestrian Crosswalk Sidewalk and Multi-Purpose Trail ~ Potential Pedestrian Crosswalk Sidewalk, Class II Bikeway, and Multi-Purpose Trail Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (04-01-2026), San Bernardino County (2025) Figure 4-5 0 200 400 800
---Feet
Conceptual Non-Vehicular Circulation and Mobility Plan
4-12
5023

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-13

4.2 Utility Infrastructure Plan
Buildout of the Eucalyptus Business Park
SpeciÞc Plan area requires the installation of
water, sewer, drainage, and other utility
infrastructure, as described in the subsections
below. All utility infrastructure improvements
shall be constructed in accordance with
applicable City of Ontario design standards
and speciÞcations.

Public utility mains shall be located within
publicly dedicated ROW and publicly
dedicated streets. Any proposed public utilities
within private streets shall be subject to City
approval and contained within acceptable
easements, access, and separation
requirements. Minimum width for a public
utility easement (PUE) shall be at least 20 feet
wide and shall be centered on the public utility
main. Setbacks are required when there is a
public utility within a private street, drive, or
alley to accommodate any utility
appurtenances. Additionally, private utilities
are not allowed within the PUEs.

4.2.1 Potable Water Plan
The City of Ontario provides water service to
the SpeciÞc Plan area. The SpeciÞc Plan area
lies within the 925 Pressure Zone (PZ). As
shown on Figure 4-6, Potable Water
Infrastructure Plan, planned potable water
lines proposed by projects outside of the
SpeciÞc Plan area include a 16-inch potable
water line within Eucalyptus Avenue between
Campus Avenue and Grove Avenue; and a 24-
inch potable water line within Eucalyptus
Avenue between Grove Avenue and Walker
Avenue. Additionally, an existing 30-inch
potable water line within Grove Avenue
between Eucalyptus Avenue and Ontario
Ranch Road. Any existing potable water mains
not yet accepted by the City that support the
development of the SpeciÞc Plan are required
at the responsibility of the developer to support
the development of the SpeciÞc Plan area.

Potable water system improvements within the
SpeciÞc Plan area require the planning,
design, and construction of the following: 12-
inch potable water lines along Bon View
Avenue from Eucalyptus Avenue to the
northern boundary of the SpeciÞc Plan area;
16-inch potable water lines along Campus
Avenue and Walker Avenue from Eucalyptus
Avenue to the northern boundary of the
SpeciÞc Plan area; and a 12-inch potable
water line along Public Street ‘A’ between
Campus Avenue and Walker Avenue.

The overall water infrastructure plan to serve
the City of Ontario is illustrated on Figure 4-7,
City of Ontario Ultimate Water System. Final
sizing of required infrastructure shall be
determined at the time of development during
Þnal design based on hydraulic calculations.

The required infrastructure is subject to
change based upon Þndings of City approved
hydraulic studies, master plan updates, and
project Þnal designs. Any existing utilities,
including other agencies' mains, that do not
meet minimum depths, standard alignment
locations, and/or minimum horizontal and
vertical separation requirements shall be
subject to relocation/replacement by the
developer(s) of the SpeciÞc Plan.

All on-site improvements are required to have
hydraulic studies to determine infrastructure
improvements needed to support each area
and shall be the responsibility of the
developer(s). Any changes in land use not
limited to units, density, or intensity, that are
not previously accounted for in a City approved
study following current design criteria shall
trigger a revised updated hydraulic study and
any new Þndings of infrastructure
improvements needed are required at the
responsibility of the developer.

The City’s Potable Water Master Plan identiÞes
new water facilities to serve the Ontario Ranch
area, which will need to be constructed prior to
5024

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-14
or concurrent with the SpeciÞc Plan area’s
water improvements. Construction of the
SpeciÞc Plan area’s water improvements and
the Master Plan water improvements
necessary to serve the SpeciÞc Plan area shall
be the responsibility of the developer(s). The
Eucalyptus Business Park SpeciÞc Plan will be
required to participate in the Master Plan water
improvements as detailed in this SpeciÞc Plan.

As a part of the backbone infrastructure, the
master planned 925 Pressure Zone (PZ)
reservoir shall be constructed on the Cityowned reservoir site as directed by the City.

Well supply and any drinking water treatment
necessary for the 925 PZ shall be constructed
to supply the 925 PZ reservoir. The 925
Pressure Zone (PZ) Phase 2 Potable Water
System facilities will need to be constructed to
support the Project. In the event the 925 PZ
Phase 2 facilities are not completed in time to
serve the Project, the developer(s) may
implement an interim water supply strategy,
subject to review and approval by the City. The
off-site improvements include the construction
of 42-inch water main on Grove Avenue, from
Chino Avenue to Francis Street, proceeding
west on Francis Street to Bon View Avenue,
continuing north on Bon View Avenue to the
City-owned Reservoir site. Additional
improvements include installing a 42-inch
potable water main in Grove Avenue
connecting from the 30-inch to the 42-inch
potable water main in Grove Avenue at Chino
Ave; and extending to the Bon View Avenue
Reservoir site and to the Reservoir; and,
installing a 9 million gallon reservoir on the Bon
View Reservoir site; and, installing two 2,500
gpm wells with any treatment necessary to
meet water quality standards and the 16-inch
to 42-inch well collection mains from the wells
to the reservoirs. The Eucalyptus Business
Park SpeciÞc Plan will be required to
participate in the future Phase 2 Water System
Improvements as detailed in the development
agreements with the City.
5025
PA4

BUSINESS PARK

18.19AC.

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Note: Final sizing of utility mains shall be dependent
on hydraulic studies done at the time of development.

PA6

BUSINESS PARK

37.71 AC.
---16" ----------------- I ----------- 24" ___________ _j Specific Plan Area
Point of Connection
El!Jl!i'AJ;Y:f>.f/JS¥Al1E
-- -
Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (11-20-2025), San Bernardino County (2025) 0 200 400 800
---Feet
Existing Potable Water Line
Proposed Potable Water Line
Figure 4-6
Potable Water Infrastructure Plan
4-15
5026
Legend
D Specific Plan Area
c:J City Boundary
925 Pressure Zone
1010 Pressure Zone
1074 Pressure Zone
1212 Pressure Zone
Specific Plan Required
Potable Water Mains
Proposed 42"Water Main
Improvements (Phase 2)
Zone 925 Pipe
Zone 1010 Pipe
Zone 1074 Pipe
Zone 1212 Pipe
Pressure Reducing Station
• Altitude Valve
• Reservoir
■ Active Well
□ Inactive Well
Note: Phase 2 alignment shown is
onceptual and not fina lized.

Source(s): Ontario Municipal Utilities Company (OMUC) (October 2011 ) PHILADELPHIA sl

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
SCHAEFER AVE!
I
!
ON TARIO RANCH RD I ==---+-----t----t------ii--..-
1 EUCALYPTUS AVE I ~ ---- -----ii I I I
I I ==-~--
I MERRILL AVE: ______ •-- •--•------•------ -•-- , __ ---•-- -• ------ w ~ UJ w w w w w w w I ~ <( ii: ~ ii: ii: ii: ii: ii: ii:

Q ~ 3 s: <3 ~ 0 ffi a:: §! -' <( a.!!e Z oU,-:: \!,! <( U ~ ::; > 0 a:: 0:: -' <( >' => => <C z :a ('.)1-ei: si: en w I w (f) uo <( ~- CD U > =>
u
Figure 4-7
City of Ontario Ultimate Water System
4-16
5027

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-17

4.2.2 Recycled Water Plan
The City of Ontario/Ontario Municipal Utilities
Company (OMUC) and the Inland Empire
Utilities Agency (IEUA) supplies recycled water
to the SpeciÞc Plan area. Recycled Water
supplied by OMUC is produced by the IEUA
from its four wastewater reclamation plants. As
shown on Figure 4-8, Recycled Water
Infrastructure Plan, existing recycled water
lines include a 30-inch IEUA recycled water
line within Eucalyptus Avenue between
Campus Avenue and Bon View Avenue; a 12-
inch City of Ontario recycled water line within
Eucalyptus Avenue between Bon View Avenue
and Walker Avenue; a 30-inch IEUA recycled
water line within Bon View Avenue between
Eucalyptus Avenue and Ontario Ranch Road;
and a 30-inch IEUA recycled water line within
Ontario Ranch Road between Bon View
Avenue and Walker Avenue.

Recycled water infrastructure improvements
for the SpeciÞc Plan area require the planning,
design, and construction of the following: an 8-
inch recycled water line within Grove Avenue
and Walker Avenue between Eucalyptus
Avenue and the northern edge of the SpeciÞc
Plan area. At the discretion of the City,
additional recycled water line may be needed
within Campus Avenue and Public Street ‘A’ to
support development parcels not fronting a
master planned recycled water main.

Improvements may include an 8-inch recycled
water line within Campus Avenue between
Eucalyptus Avenue and the northern edge of
the SpeciÞc Plan area; and an 8-inch recycled
water line along Public Street ‘A’ between
Campus Avenue and Walker Avenue.

The Eucalyptus Business Park SpeciÞc Plan
shall make use of recycled water for all
approved uses including, but not limited to, the
irrigation of parks, street parkway landscaping,
and any other Property Owners’ Association
(POA) maintained common areas. The
developer shall prepare and secure approval
of an Engineering Report from the City of
Ontario and State Department of Drinking
Water Agency prior to the use of recycled
water.

Final sizing of required infrastructure shall be
determined at the time of development during
Þnal design based on hydraulic calculations.

The required infrastructure is subject to
change based upon Þndings of City approved
hydraulic studies, master plan updates, and
project Þnal designs. Any existing utilities,
including other agencies' mains, that do not
meet minimum depths, standard alignment
locations, and/or minimum horizontal and
vertical separation requirements shall be
subject to relocation/ replacement by the
developer(s) of the SpeciÞc Plan. The
developer of the SpeciÞc Plan area is required
to obtain approvals from IEUA for regional
connections outlined in the SpeciÞc Plan and
additional regional connections as required to
support development not fronting a City
recycled water main.

All on-site improvements are required to have
hydraulic studies to determine infrastructure
improvements needed to support each area
and shall be the responsibility of the developer.

Any changes in land use not limited to units,
density, or intensity, that are not previously
accounted for in a City approved study
following current design criteria shall trigger a
revised updated hydraulic study and any new
Þndings of infrastructure improvements
needed are required at the responsibility of the
developer.
5028
----- PA7
OPEN SPACE 811 OPEN SPACE

8.00 AC. 13.99 AC.

PA 1

BUSINESS PARK

7.70AC.

PA4

BUSINESS PARK

18.19 AC.
• II I
PA2

BUSINESS PARK

18.33 AC.

PAS

BUSINESS PARK

37.76AC.

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
PA3

BUSINESS PARK
1---------------'-18"'.2,,__,1--'-' AC'°'-.-----------l.~ = ! ~ PA6 •!I!
BUSINESS PARK 'j 37.71 AC.

II
-------· ---------- • • ■ • ... :.....,.;;;;;,~~~~==~~ El!Jli:AL•Y.f'.TUS'AVE .i - I
=1
-
Legend
',_ --_J Specific Plan Area
Point of Connection
0 Point of Connection (IEUA)
. -. . -.

Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (04-01-2026), San Bernardino County (2025) 0 200 400 800
---Feet
Recycled water line that may be required if needed
to support development parcels not fronting a master
planned recycled water main, at City's discretion
Existing City Recycled Water Line
Existing IEUA Recycled Water Line
Proposed Recycled Water Line
Figure 4-8
Recycled Water Infrastructure Plan
4-18
5029

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-19

4.2.3 Sanitary Sewer Plan
Sanitary sewer/wastewater collections for the
SpeciÞc Plan area are served by the City of
Ontario/OMUC, which conveys wastewater to
the IEUA for transmission and treatment. As
shown on Figure 4-9, Sanitary Sewer
Infrastructure Plan, at the time the SpeciÞc
Plan was prepared, there is no existing sanitary
sewer infrastructure within the SpeciÞc Plan
area.

Sanitary sewer infrastructure improvements for
the SpeciÞc Plan area require the planning,
design, and construction of the following: a 15-
inch sanitary sewer line within Campus Avenue
between Eucalyptus Avenue and the northern
border of the SpeciÞc Plan area; an 18-inch
sanitary sewer line within Bon View Avenue
between Eucalyptus Avenue and the northern
border of the SpeciÞc Plan area; and a 21-inch
sanitary sewer line within Grove Avenue and
Walker Avenue between Eucalyptus Avenue
and the northern border of the SpeciÞc Plan
area. At the discretion of the City, additional
sanitary sewer lines may be needed within
Eucalyptus Avenue and Public Street ‘A’ to
support development parcels not fronting a
master planned sewer main. Improvements
may include an 8-inch sanitary sewer line
within Eucalyptus Avenue east of Bon View
Avenue to connect with the proposed sewer
line east of Bon View Avenue; an 8-inch
sanitary sewer line within Eucalyptus Avenue
east of Grove Avenue to connect with the
proposed sanitary sewer line east of Grove
Avenue; an 8-inch sanitary sewer line within
Public Street ‘A’ east of Campus Avenue to
connect with the proposed sewer line within
Campus Avenue; an 8-inch sanitary sewer line
within Public Street ‘A’ east of Bon View
Avenue to connect with the proposed sewer
line within Bon View Avenue; and an 8-inch
sanitary sewer line within Public Street ‘A’ west
of Walker Avenue to connect with the
proposed sewer line within Walker Avenue.

Any existing sewer mains not yet accepted by
the City that are downstream of the SpeciÞc
Plan area are required at the responsibility of
the developer to support the development of
the SpeciÞc Plan.

In addition to proposed sewer infrastructure,
tributary flows are also included in Figure 4-9.

The flows arrows show which sewer lines are
supporting the sewer flows from each planning
area.

Required sanitary sewer infrastructure is
subject to change based upon Þndings of Cityapproved hydraulic studies, master plan updates, and project Þnal designs; and, sewer
main locations are also subject to change
based upon the developer-conducted and
City-approved Conceptual Design Report.

Final sizing of sewer mains shall be determined
during Þnal design by hydraulic calculations
through a Sewer Study or Sewer Sub-Area
Master Plan (SSAMP) per the City’s current
Sewer Master Plan.

Any existing utilities, including other agencies'
mains, that do not meet minimum depths,
standard alignment locations, and/or minimum
horizontal and vertical separation
requirements shall be subject to relocation/
replacement by the developer(s) of the
SpeciÞc Plan.

All on-site improvements are required to have
hydraulic studies to determine infrastructure
improvements needed to support each area
and shall be the responsibility of the developer.

All on-site intract public sewer mains shall be
studied via a Sewer Sub-Area Master Plan
(SSAMP) per the City’s current Sewer Master
Plan. Any changes in sewer tributary
boundaries, as acceptable at the City’s
discretion or land use not limited to units,
density, or intensity, that are not previously
accounted for in a City approved study
following current design criteria shall trigger a
5030

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-20
revised updated sewer study and any new
Þndings of infrastructure improvements
needed are required at the responsibility of the
developer.

The off-site public sewer shall be designed to
meet all applicable City standards and
requirements and designed in such a way so
that the proposed on-site private sewer
improvements shall be designed to meet all
applicable building and plumbing codes.

Eucalyptus Business Park SpeciÞc Plan’s
sewer tributary areas shall be determined in
conformance with the latest City Sewer Master
Plan while accommodating the off-site and onsite sewer standards, codes, and requirements, etc. If Eucalyptus Business Park
SpeciÞc Plan’s sewer tributary areas need to
be revised to allow the public or private sewer
to meet applicable requirements, and a revised
SSAMP supports the revised sewer tributary
boundaries, as approved at the City’s
discretion, then Figure 4-10 shall be revised to
reflect Eucalyptus Business Park SpeciÞc
Plan’s new sewer tributary boundaries.
5031
PA4

BUSINESS PARK

18.19 AC.
.....
8"
+-
+-
Specific Plan Area
Tributaries
Flow Direction

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Note: Final sizing of utility mains shall be dependent
on hydraulic studies done at the time of development.

OPr:s~CE --- • .-~ r - OP~sfu:·--..... -- 8., --7

13.99AC. public sire ~ 13.89AC. ___ j
PA2 ---+ +- PA3
BUSINESS PARK +- BUSINESS PARK ---+ :
18~~ ~ 1L~~
PAS

BUSINESS PARK

37.76AC.
.....

EUCALYPTUS AVE
. -.
l> = i -
~ N Qi:
~
+-
Point of Connection
Existing Sanitary Sewer Line
PA6

BUSINESS PARK

37.71 AC.

Proposed Sanitary Sewer Line
.....

Tributary Flow Direction
Optional Sewer line that may be required if needed
to support development parcels not fronting a master
planned sewer main, at the City's discretion.

Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (04-01 -2026), San Bernardino County (2025) Figure 4-9 0 200 400 800
---Feet
Sanitary Sewer Infrastructure Plan
4-21
5032

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-22

4.2.4 Storm Water Management Plan
As shown on Figure 4-10, Storm Drain
Infrastructure Plan, existing storm drain
infrastructure includes a 24-inch storm drain
line within Eucalyptus Avenue east of Campus
Avenue; a 42-inch storm drain line within
Eucalyptus Avenue west of Bon View Avenue;
a 24-inch line within Eucalyptus Avenue east of
Bon View Avenue, a 24-inch storm drain line
within Eucalyptus Avenue just east and west of
Grove Avenue; and a 24-inch storm drain line
within Eucalyptus Avenue west of Walker
Avenue.

Storm drain infrastructure improvements for
the SpeciÞc Plan area require the planning,
design, and construction of the following: a 60-
inch storm drain line within Campus Avenue
between Eucalyptus Avenue and the northern
boundary of the SpeciÞc Plan area; a 96-inch
storm drain line within Bon View Avenue
between Eucalyptus Avenue and the northern
boundary of the SpeciÞc Plan area; a 108-inch
storm drain line within Grove Avenue and
Walker Avenue between Eucalyptus Avenue
and the northern boundary of the SpeciÞc Plan
area; 24-inch storm drain lines within Public
Street ‘A’ between Campus Avenue and Bon
View Avenue; and 36-inch storm drain lines
within Public Street ‘A’ between Bon View
Avenue and Walker Avenue.

The overall storm drain infrastructure plan to
serve the City of Ontario is illustrated on Figure
4-13, City of Ontario Planned Drainage
Facilities. Required storm drain infrastructure
is subject to change based upon Þndings of
City-approved hydraulic studies, master plan
updates, and project Þnal designs. If the storm
drain improvements are not completed and
accepted by the City, the developer of this
SpeciÞc Plan is subject to the storm drain
improvements required.

If at the time of construction, Line I in Euclid
Avenue in the City of Chino has not been
constructed, the developments tributary to this
line (see Figure 4-13) will need to detain and
release their runoff at 80% of the predevelopment flows.

A. National Pollutant Discharge Elimination
System (NPDES) Compliance and Water
Quality Management Plan (WQMP)
The grading and drainage areas design for the
on-site storm drain system improvements
within the Eucalyptus Business Park SpeciÞc
Plan area will utilize a variety of Low Impact
Development (LID) design concepts to detain,
Þlter, and treat surface runoff in a practical
manner to comply with the requirements of the
San Bernardino County NPDES Storm Water
Program’s current WQMP and the City’s
NPDES program requirements for new
development projects.

The objective of project-speciÞc WQMPs is to
minimize the detrimental effects of
urbanization on the beneÞcial uses of receiving
waters, including effects caused by increased
water pollutants and changes in hydrology.

These effects shall be minimized through the
implementation of on-site and off-site LID Site
Design Best Management Practices (BMP’s)
that retain/inÞlter or biotreat 85th percentile
storm event runoff from the SpeciÞc Plan area.

In addition, non-structural and structural
Source Control BMP’s will be implemented and
documented in approved Water Quality
Management Plan(s) associated with the
design of implementing development projects
to reduce pollutant generation and transport
from the SpeciÞc Plan area.

All Priority Land Use (PLU) areas, deÞned by
the State Water Resources Board (SWRCB) as
high trash generating areas such as industrial
uses within the SpeciÞc Plan area shall comply
with the statewide Trash Provisions adopted by
the SWRCB and trash requirements in the
5033

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-23
most current San Bernardino County AreaWide MS4 permit.

Prior to the issuance of any grading or
construction permits for any parcel map or
area that disturbs one (1) acre or more of land
within the Eucalyptus Business Park SpeciÞc
Plan area, an Erosion Control & Sedimentation
Plan and Storm Water Pollution Prevention
Plans (SWPPP) will be prepared to comply with
California State Water Resources Control
Board’s (State Water Board) current “General
Permit to Discharge Storm Water Associated
with Construction Activity” and current “Area
Wide Urban Storm Water Runoff (Regional
NPDES) Permit.” SWPPPs are required to
identify and detail all appropriate Best
Management Practices (BMPs) to be
implemented or installed during construction.

B. Airport Compatibility
The SpeciÞc Plan area is located in the Airport
Influence Areas (AIAs) of the Ontario
International Airport and the Chino Airport.

The Federal Aviation Administration (FAA)
identiÞes stormwater management facilities as
one of the greatest attractants to wildlife
hazards to airport operations. For this reason,
all new above ground stormwater
management facilities located within the
Eucalyptus Business Park SpeciÞc Plan area
will be designed to avoid the creation of open
water and habitat by being designed to drain
completely within a maximum 48-hour period
following design storm event (i.e., 24-hour
storm) and remain totally dry between storm
events.
5034
Specific Plan Area
Flow Direction

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
• - • Existing Storm Drain Line
Proposed Master Planned Storm Drain Line
Proposed Project Specific Storm Drain Line
3_611 on~~~fE 0fm~1~E 36"
l,~ ==i~iiiiiD i!!!!i;~~l,===iiiiiF~lii.iiiii!~P!!iA~2E::::::::;J. PA 3 PA4 BUSINESS PARK 18.19AC.

BUSINESS PARK BUSINESS PARK lB.JJAC. -----~18=.21=AC~. ______ _ PAS BUSINESS PARK J7.76AC.
24" 24" ---- • --------------- ------ lllllil • EUCAhYPTUSAVE" ..

PA6 BUSINESS PARK 37.71 AC.

Note: Final sizing of storm drain infrastructure shall be dependent on City-approved hydraulic studies, master plan updates, and project final designs.

Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (04-01 -2026), San Bernardino County (2025) ~ 0 275 550 1,100
m-..-Feet
Figure 4-10
Storm Drain Infrastructure Plan
4-24
5035
Legend
~ Planned Storm Drain, Size and line ID
-- Drainage Area Boundary
- - - - Drainage System Boundary
-···-Existing County Open Channel
- - - - Existing County Storm Drain and Size (in inches) - • - Existing Grass Lined Channel (Maintained by Property Owner) I 8" 48"
I EIJLD •XN•S
IJ
I 'I•·· '72" 48" EV<D•XW••
1\
I I
~1-=---J,
"'""' """'"-

CHINO AIRPORT
120"
I
I
;J
~
I
CHINO
Source(s): Ontario Municipal Utilities Company (OMUC) (03-09-2012) Effl'I Affltw IIEil
CITY or CHINO MASTER PLANNED LINE A
WALKER AVE STORl.4 DRAIN

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
_(x_J - Existing City Storm Drain and Size (in inches)
: : Existing Detention Basin (Maintained by Other Agencies) (Pl Parallel to Existing Storm Drain
Drainage Area#
WLJ<R.xn ., System Identification
":;,""_; L-oc,
"if.,
1:1 96" M£RL.XJ . 1 •
102" "
II I
~
6" 60"
ARCH· X · 2
County Limit
City limit
CJ Specific Plan Area
------ Specific Plan Required Drainage Facilities
I
,,,,
:I
I I
;,,I I M l I
i I SAN BERNARDINO/ 11/ RIVERSIDE
~lj COUNTY LINE
*NOTES:
(2) Revision to Area XI and XII
(Priorities C- 12 and C-13)
Figure 4-11
City of Ontario Planned Drainage Facilities
4-25
5036

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
4-26

4.2.5 Dry Utilities Plan
Southern California Gas Company (SoCal
Gas) provides gas service, Southern California
Edison (SCE) provides the electric service,
and OntarioNet Fiber and Frontier
Communications provide telecommunication
(telecom) services to the SpeciÞc Plan area.

As shown on Figure 4-12, Dry Utilities
Infrastructure Plan, and Figure 4-13, Fiber
Optics Plan, existing dry utilities infrastructure
includes a 3-inch gas line within Eucalyptus
Avenue between Campus Avenue and Bon
View Avenue; a 3-inch and a 12-inch gas line
along Eucalyptus Avenue between Bon View
Avenue and Grove Avenue; a 2-inch and a 12-
inch gas line within Bon View Avenue; a 4-inch
gas line within Grove Avenue; and a 2-inch gas
line within Walker Avenue.

Dry utilities, including electric and telecom
improvements for the SpeciÞc Plan area
require the planning, design, and construction
of the following: new SCE and telecom lines
within Campus Avenue, Bon View Avenue,
Grove Avenue, Walker Avenue, Eucalyptus
Avenue, and Public Street ‘A’; new Þber optic
lines within Campus Avenue, Bon View
Avenue, Grove Avenue, Walker Avenue,
Eucalyptus Avenue, and Public Street ‘A’. The
SpeciÞc Plan would also install a new gas line
in Campus Avenue between Eucalyptus
Avenue and the northern boundary of the
SpeciÞc Plan area as part of areawide
infrastructure improvements; However, the
SpeciÞc Plan would not utilize natural gas.

All dry utilities internal to the Eucalyptus
Business Park SpeciÞc Plan area will be
installed underground in conjunction with the
development of the SpeciÞc Plan area in
accordance with applicable public utility
standards and speciÞcations and to the
satisfaction of the Ontario City Engineer. The
location of other lateral connections,
transformers, switches, pull boxes, and dry
utility manholes will be determined at the time
buildings are positioned and uses are
established in each planning area in
conjunction with implementing development.

4.3 Conceptual Grading Plan
As part of site grading activities, the majority of
the SpeciÞc Plan area would be subject to
grading and disturbance. SpeciÞcally, grading
activities on-site would require approximately
1,000,000 cubic yards (CY) of cut and
approximately 1,150,000 CY of Þll. Net Þll
(import) would be 150,000 CY. Within this
earthwork operation, the site needs to export
approximately 51,000 CY of organic materials.
5037

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
N
-------
PA7
OPEN SPACE OPEN SPACE 'If. ~--- OPEN SPACE

8.00 AC. 13.99 AC. ===1=3=.8=9 A=C.=================~
PA 1 I PA 2 I PA 3
"" "' BUSINESS PARK "' BUSINESS PARK BUSINESS PARK ,
~ "' 7.70AC. Ir 18.33AC. ~ 18.21AC. ~
"' '-=' a: <( <(
il'l = s: ~ "' fi""" PA4 I!: PAS l!., PA6 :!
@ BUSINESS PARK ~ BUSINESS PARK .~ BUSINESS PARK 1 ~ 18.19AC. ■ 37.76AC. 37.71 AC. ■ I I : 1
- - - - ,.._ - - - EIJ.€ALlfBTUS,AVE - -
" Gas :-=.~= 311 ·&·12" Gas ::::.::~~=-
Specific Plan Area
Existing Gas Utility Line
Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (11-20-2025), San Bernardino County (2025) 0 200 400 800
---Feet
Proposed Gas Utility Line
Proposed SCE and Telecom Lines
Figure 4-12
Dry Utilities Infrastructure Plan
4-27
5038

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
,--------- -- --------- PA9 -----------7
: OPrts~cE j ,;.eij~ !!!!!!!~+~!!!!!!!!!!~ IIDEN SPACE , 8.00AC. . ~ 13.89AC.

PA 1 PA2 PA3
BUSINESS PARK ~ BUSINESS PARK BUSINESS PARK
,__ ____ 7._70_A_C. ___ __,1.aj.:1--------------'-18=.3=3_,_, AC=·------------1 !it 18.21 AC. !:ll PA4

BUSINESS PARK

18.19AC.
i ~
!it ! ! PA s ~ PA 6 :I,! ~ BUSINESS PARK = BUSINESS PARK ;::
37 .76 AC. 37 .71 AC.
------------ El!l®i'il!Y-P..11!1SfA'tE
Specific Plan Area
Point of Connection
■ - ■ Existing Fiber Optic Line
Proposed Fiber Optic Line
I
I
Source(s): Esri, Nearmap Imagery (January 2025). Michael Baker (11 -16-2025), San Bernardino County (2025) Figure 4-13 0 200 400 800
---Feet
Fiber Optics Plan
4-28
5039

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-1
CHAPTER 5

DEVELOPMENT REGULATIONS

5.1 Purpose and Intent
This Chapter formally establishes the use
permissions and development standards
(zoning) for the Eucalyptus Business Park
SpeciÞc Plan area. The regulations provided
herein work in concert with the architectural
and landscape guidelines set forth in Chapter
6, Design Guidelines, to achieve the vision of
this SpeciÞc Plan.

5.2 DeÞnition of Terms
The meaning of words, phrases, titles, land
uses, and terms shall be the same as provided
in the City of Ontario Development Code
(hereafter referred as “Development Code”),
unless otherwise speciÞcally deÞned in this
SpeciÞc Plan.

5.3 Applicability
The regulations set forth in this Chapter shall
apply to all development plans or agreements,
tract or parcel maps, site plans, or any other
action requiring administrative or discretionary
approval within the approximately 189-acre
Eucalyptus Business Park SpeciÞc Plan area.

If the development standards contained herein
differ from those contained in the Ontario
Development Code, the provisions of this
SpeciÞc Plan shall take precedence. Any
development standard, condition, or situation
not speciÞcally addressed herein shall be
subject to the applicable requirements of the
Ontario Development Code.

5.4 Permitted, Conditionally
Permitted, and Administratively
Permitted Uses
Land within the Eucalyptus Business Park
SpeciÞc Plan area and structures/facilities
thereon may be developed, divided, and/or
used for those activities listed in Table 5-1,
Permitted Land Uses. Table 5-1 lists the
permitted, conditionally-permitted, and
administratively permitted land uses for each
land use district established by this SpeciÞc
Plan (Business Park and Open Space –
Parkland). A use that is not listed in Table 5-1
is a prohibited use unless otherwise allowed
pursuant to the procedures described in
Chapter 7, Implementation Plan, or through
applicable interpretations and determinations
established by the Development Code.

The SpeciÞc Plan area is located within the
Chino Airport (CNO) AIA. The San Bernardino
County Comprehensive Land Use Plan for
Chino Airport was adopted in 1991 and does
not reflect guidance set forth in the 2011
Caltrans Airport Land Use Planning
Handbook. As such, in 2022, the City of
Ontario adopted the CNO Overlay District
which provides maps, criteria, and policy
language to guide development within the
Chino AIA consistent with the 2011 Caltrans
Airport Land Use Planning Handbook. The
majority of the SpeciÞc Plan area is located
within CNO Safety Zone 5 (low risk), with a
very small portion of the southeastern corner
located within Safety Zone 4 (moderate risk).
5040

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-2
Development within the land use overlay
district may have building height, land use, and
floor area ratio (FAR) limitations and is subject
to open land requirements. The more stringent
criteria between those indicated in the
applicable provisions set forth in this overlay
district and this SpeciÞc Plan shall govern.
5041

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-3
The symbols shown in Table 5-1 have the following meanings:
“P” – the land use is permitted by right, subject to the development standards applicable to that land use district.
“C” – the land use is conditionally permitted, subject to the Þling of a Conditional Permit in accordance with the requirements of the Ontario Development Code and must be approved by the City of Ontario Zoning Administrator or Planning Commission before the use can be established within a particular land use district.
“A” – the land use is administratively permitted, subject to the Þling of an Administrative Use Permit in accordance with the requirements of the Ontario Development Code.

Table 5-1 Permitted Land Uses
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
Agriculture, Forestry, Fishing, Hunting
Temporary and interim
agriculture uses P P
Restricted to existing legally
established agriculture and
dairy uses.

Manufacturing
Aerospace P --
Alcoholic beverage
manufacturing
(breweries, wineries,
distilleries, and related
tasting room)
C ---
Apparel P ---
Automotive P --
Boutique/artisan smallscale and micro
manufacturing facilities
P ---
Includes all types of smallscale businesses that
produce tangible goods, such
as textiles, hardware and
hardware prototyping,
woodworking, metal working,
3D printing, consumer
product design and
prototyping, nonalcoholic
beverage, local food
production and packaging,
soaps, perfumes, and lotions.

Computer and
electronic products P ---
5042

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-4
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
Electrical equipment,
appliances, and
components
P ---
Food P ---
Including bread, tortilla, snack
foods, roasted nuts, coffee
and tea, spice and extract,
and other miscellaneous food
manufacturing)
Footwear P ---
Furniture and related
product manufacturing P ---
Leather and allied
product P ---
Miscellaneous
manufacturing P ---
Includes medical equipment
and supplies; jewelry and
silverware; sporting and
athletic goods; dolls, toys and
games; ofÞce supplies; signs;
and other miscellaneous
manufacturing.

Painting, Powder
Coating and Polishing
Metal and Metal
Products for the Trade
C --
Activities are restricted to
within a fully enclosed
building.

Pharmaceuticals and
medicines C ---
Plastic product
manufacturing P ---
Printing and related
support activities P ---
Textile product mills P ---
Activities are restricted to
within a fully enclosed
building.

Wholesale Trade
Automotive parts and
accessories (excludes
automotive repair)
P ---
Business to business
electronic markets P ---
Includes sale of goods such
as household goods,
computer parts, clothing,
5043

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-5
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
food, ofÞce supplies, and
other tangible goods.

Durable and
nondurable goods
agents and brokers
P ---
Agent and brokers that
facilitate wholesale
transactions of tangible
goods for manufacturers and
buyers
Furniture and home
furnishings P ---
Group purchasing
organizations P ---
Hardware and
plumbing, and heating
equipment and
supplies
P ---
Household appliances
and electrical and
electronic goods
P ---
Merchant wholesalers,
nondurable goods P ---
Excludes industrial gases,
petroleum bulk stations and
terminals, and Þreworks and
explosives.

Miscellaneous durable
goods P ---
Includes musical instruments,
prerecorded compact discs
and digital video discs, and
timber and timber products.

Motor vehicle parts
and supplies P ---
Professional and
commercial equipment
and supplies
P ---
Includes wholesale
distribution of durable goods
designed for business,
industrial, or professional use,
including medical,
photographic, ofÞce, and
computer equipment.

Sporting and
recreational goods and
supplies
P ---
Sales of Þrearms will require
an approved CUP.

Toy and hobby goods
and supplies P ---
5044

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-6
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
Jewelry, watches,
precious stones, and
precious metals
P ---
Retail Services
Automated fueling
stations (“card lock”
facilities)
P ---
Automobile, light truck
and van body, paint,
and interior repair and
customization
C ---
Automobile, light truck
and van repair and
maintenance
C ---
Batting cages – indoor C ---
Cafeterias and buffets1 P ---
Outdoor dining areas, both
temporary and permanent,
which are provided in addition
to seating areas approved
with the development of a
building, may be permitted,
subject to the approval of an
Administrative Use Permit.

Convenience stores1 P ---
Gross floor area shall not
exceed 10,000 sq. ft. for a
single building.

Fitness and
recreational sports
centers (limited to
health clubs and gyms,
Þtness and sports
training facilities, tennis
club, swim clubs and
other activities and
facilities)
• GFA less than
10,000 SF
P ---
Fitness and
recreational sports
centers (limited to
health clubs and gyms,
Þtness and sports
C ---
5045

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-7
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
training facilities, tennis
club, swim clubs and
other activities and
facilities)
• GFA 10,000 or
more SF
Full-service
restaurants2 P ---
Outdoor dining areas, both
temporary and permanent,
which are provided in addition
to seating areas approved
with the development of a
building, may be permitted,
subject to the approval of an
Administrative Use Permit.

Gasoline stations with
convenience stores1 C ---
Home and garden
equipment and
appliance repair and
maintenance
P ---
Industrial retail sales
(limited to the ancillary
sales of goods and/or
product either
manufactured,
warehoused, or
wholesaled on-site)
• ≤ 8,000 SF
P ---
Industrial retail sales
(limited to the ancillary
sales of goods and/or
product either
manufactured,
warehoused, or
wholesaled on-site)
• > 8,000 SF of
building GFA
C ---
Limited-service and
fast food restaurants P ---
Outdoor dining areas, both
temporary and permanent,
which are provided in addition
to seating areas approved
with the development of a
5046

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-8
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
building, may be permitted,
subject to the approval of an
Administrative Use Permit.

Other Personal and
Household Goods
Repair and
Maintenance -- Without
Retail Sales (limited to
garment alteration and
repair, jewelry repair,
key duplicating,
musical instrument
repair and tailor shops)
P ---
Reupholsters and
furniture repair P ---
Self-serve and fullservice gasoline
stations1
C ---
Automotive servicing
facilities (limited to
retail-oriented services,
such as emissions
testing, battery
replacement and other
similar retail activities
that involves the limited
use of pneumatic tools
or equipment that
create noise impacts)
P ---
Simulated racing
(limited to go-carts,
radio-controlled
vehicles, and other
similar facilities)
C ---
Snack and
nonalcoholic beverage
bars1
P ---
Outdoor dining areas, both
temporary and permanent,
which are provided in addition
to seating areas approved
with the development of a
building, may be permitted,
subject to the approval of an
Administrative Use Permit.
5047

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-9
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
Vending machine
operators (retailing of
merchandise through
vending machines, as
an ancillary business
activity, within a fully
enclosed building)
P ---
Transportation & Warehousing
Couriers and
messengers
P ---
Data center C ---
General warehousing
and storage within a
wholly enclosed
building
P ---
FulÞlment Center P ---
Outdoor materials and
equipment storage in
conjunction with an
allowed use
C ---
Package and Parcel
Sorting and Delivery P ---
Sorting facilities that direct
packages to their Þnal
destination.

Parking lots and
parking garages in
conjunction with
allowed uses
P ---
Physical records,
digital assets, and
media archives storage
C ---
Plug-In Electric Vehicle
(PEV) Charging
Facilities
P ---
Postal service P ---
Indoor Vehicle Storage P ---
Outdoor Vehicle
Storage C ---
Professional, ScientiÞc, Tech. Services
Broadcasting (except
internet) P ---
Business support
services P --- Includes consulting,
administrative tasks, IT
5048

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-10
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
support, and Þnancial
management.

Depository credit
intermediation P ---
Limited to commercial
banking, savings institutions,
and credit unions.

Financial transactions
processing and
clearinghouse activities
P ---
Establishments that facilitate
electronic funds transfers,
check clearing, credit card
processing, and managing
reserves, excluding central
bank activities.

Management of
companies and
enterprises
P ---
Motion picture and
video industries P
Includes production,
distribution, and exhibition of
Þlms, television programs,
and commercials.

Newspaper, periodical,
book, and directory
publishers
P ---
Personal Þtness trainer P ---
Physicians and
dentists, other health
practitioners,
outpatient centers,
laboratory testing
services, home
healthcare services,
and community clinics
P ---
Religious organizations C ---
ScientiÞc research and
development services C ---
Software publishers P ---
Sound (audio)
recording facilities P ---
Telephone answering
services and call
centers
C ---
Construction
Contractors (limited to
businesses whose P --- Permitted by right if
completely within a building.
5049

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-11
Use Legend:

Permitted Use = “P” Conditional Use = “C” Administrative Use = “A” Prohibited Use = “---" Use
Business Park
(PAs 1-6)
Open Space –
Parkland (PAs 7-9) Notes
primary activity is
performing speciÞc
activities involving in
construction,
engineering and capital
improvement projects,
or preparation of sites
for construction)
Conditional use permit
required if outdoor storage is
provided.

Prefabricated
construction assembly P ---
Government OfÞces
Executive, legislative,
and other general
government support
P P
Fire protection (stations
and substations) P P
Police protection
(stations, substations,
and storefront facilities)
P P
Publicly operated
animal resource center P P
Arts, Entertainment and Recreation
Open space and park
lands (publicly owned
facilities)
--- P
Other Uses
Electric Power
transmission, control
and distribution
P P
Restricted to only publicly
owned utility stations.

Telecommunication
facilities C ---
Temporary and interim
buildings, structures,
and facilities (fewer
than 5 years)
A A
Temporary and interim
buildings, structures,
and facilities (5 to 10
years)
C C
Self-storage facilities P ---
Note: 1. Uses are considered as commercial uses within the Eucalyptus Business Park SpeciÞc Plan area. The total combined square footage of the commercial uses shall not exceed 10,000 SF. 5050

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-12

5.5 Business Park Development
Standards
The following development standards establish
the development criteria that shall apply within
the Business Park land use district of the
Eucalyptus Business Park SpeciÞc Plan. The
SpeciÞc Plan area is located within the Chino
Airport Safety Zones that may limit building
height, land uses, and FAR based on the
proposed land use, and requires open land.

Refer to the Chino Airport Land Use
Compatibility Plan for additional land use
restrictions. For standards that are silent in this
SpeciÞc Plan, the applicable standards
contained within the City’s Development Code
shall apply.

Table 5-2 Development Standards
Site Requirements
BP
Minimum lot size 1.0 acre
Maximum floor area ratio
(calculated on a Planning Area by
Planning Area basis)

0.55 Minimum lot width dimensions 100 ft
Minimum lot depth dimensions 100 ft
Maximum building footprint 560,000
SF
Maximum Building Height1 60 ft
Maximum Building Height (lots
adjoining Public Street ‘A’)1 50 ft
Overall minimum landscape
coverage (landscaping shall
include plantings (trees,
shrubs, groundcovers, vines)
and trellises.)
13%2
Minimum truck court depth
(measured from dock door
perpendicularly to property
line)
120 ft
Notes:

1. Maximum building height shall also adhere to the
Chino Airport height constraints.

2. The Overall Minimum Landscape Coverage shall be
determined based on the net total acreage of all
parcels in the same phase of development. The
minimum landscape coverage requirement shall not
apply on a planning area by planning area or parcel
by parcel basis.

Table 5-3 Minimum Building and Parking
Setback Requirements
BP
Minimum setbacks from property line
Eucalyptus Avenue 25 ft
Public Street ‘A’ 20 ft
Campus Avenue 10 ft
Bon View Avenue 10 ft
Grove Avenue 20 ft
Walker Avenue 20 ft
Minimum side yard interior property line
setbacks
Building 5 ft
Drive aisles, passenger
cars and truck parking 5 ft
Screened loading and
storage yards (inclusive
of passenger cars and
truck parking within the
screened loading and
storage area)
0 ft
Minimum rear yard setback 0 ft
Table 5-4 Minimum Drive Aisle and Parking
Space Separation Requirements
BP
Adjacent to building ofÞce
elements 10 ft
Adjacent to building wall or
screen wall/fence, and not
within a screened/enclosed
yard
5 ft
Adjacent to building wall or
screen wall/fence, and within a
screened yard
0 ft

5051

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-13
Table 5-5 Parking Space Requirements
Use Required Space
Wholesale Trade 2.5 spaces per 1,000 SF
Retail Services 4 spaces per 1,000 SF
Full-Service
Restaurant 10 spaces per 1,000 SF
Fast Food
Restaurants 13.3 spaces per 1,000 SF
Professional,
ScientiÞc, Tech.

Services
4 spaces per 1,000 SF
General
Business OfÞces 4 spaces per 1,000 SF
Manufacturing1,2 1.85 spaces per 1,000 SF
gross floor area (GFA)
Warehousing
and
Distribution1,2
Portion of GFA ≤ 20,000 SF:
1 space per 1,000 SF
Portion of GFA > 20,000 SF:

0.5 space per 1,000 SF
Tractor trailer parking space:
1 space/4 dock-high doors
General
Industrial1,2
Portion of GFA < 50,000 SF:

1.85 spaces per 1,000 SF
Portion of GFA ≥ 50,000 SF
and < 100,000 SF:
1 space per 1,000 SF
Portion of GFA ≥ 100,000 SF:

0.5 space per 1,000 SF
Tractor trailer parking space:
1 space/4 dock-high doors
Business Park1,2
3 spaces per 1,000 SF
Tractor trailer parking space:
1 space/4 dock-high doors
Notes:

1. Parking for “general business ofÞces” and other
associated uses shall be provided when those uses
exceed 10% of the building GFA.

2. The SpeciÞc Plan permits a blended parking ratio for Business Park buildings to accommodate varying
proportions of business park, general industrial,
warehouse, distribution, and/or support ofÞce
functions. The Planning Director may approve
modiÞcations to the blended ratio during the
Development Plan review process based on
operational characteristics, provided parking meets
or exceeds the parking requirements in Table 5-5,
Parking Space Requirements.

5.5.1 Other Development Standards
1) Loading docks and truck parking areas
shall be visually screened from Campus
Avenue, Bon View Avenue, Grove Avenue,
Walker Avenue, and Public Street ‘A’ by
walls and landscaping features.
2) The outdoor storage of materials and
equipment shall be permitted ancillary to
the land uses allowed pursuant to Table 5-

1. Outdoor loading and storage areas and
loading doors shall be screened from view
from public streets by concrete or masonry
walls and landscaping. Any gates shall be
lockable. Such walls and landscaping used
as screening shall be a minimum eight feet
(8’) in height and shall be of sufÞcient
height to screen all outdoor materials and
equipment, tractors and trailers, and
loading doors from view of public streets.

A line of sight study shall determine the
required height(s) of the screen walls. The
storage of outdoor materials shall not
exceed the height of the screen walls as
measured from the interior side of the
walls.
3) Ground- and roof-mounted exterior
mechanical equipment, heating and
ventilating, air conditioning, tanks, and
other mechanical devices shall be of an
architecturally compatible design with the
primary structure and screened when
visible to the public.
4) Exterior lighting Þxtures shall be downward
directed. Pole-mounted lights shall be
shielded with the light source oriented to
not directly face public streets and/or
adjacent properties.
5) All manufacturing and processing activities
shall be conducted within a wholly
enclosed building.
6) The following open land and occupancy
limit requirements shall apply within the
5052

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
5-14
Chino Airport Safety Zone, as approved by
the City of Ontario City Council. Qualifying
open land is land free of most structures
and other obstacles such as walls, large
trees or poles, and overhead wires. The
minimum dimensions of the open space
area shall be 75 feet by 300 feet. Additional
open space requirements shall adhere to
the provisions provided within the Ontario
Development Code.
7) The SpeciÞc Plan area is located in the
Airport Influence Area (AIA) established by
the Ontario International Airport Land Use
Compatibility Plan (ONT ALUCP) and the
Chino Airport Safety Zone established by
the provisions within the Chino Airport
Overlay zoning district. All development in
the Eucalyptus Business Park SpeciÞc
Plan area shall be subject to the mandatory
requirements and standards of those
applicable ALUCP and the Ontario
Development Code, or in the absence of
an adopted ALUCP and Development
Code, the California Airport Land Use
Planning Handbook. Given the close
proximity of the SpeciÞc Plan area to the
Chino Airport, developers within the
SpeciÞc Plan area shall consult and
coordinate with Chino Airport agencies
and City staffs during the planning and
design stage to ensure development plans
accommodate applicable safety
restrictions. The entire SpeciÞc Plan area
is impacted by the Chino Airport;
developers within the SpeciÞc Plan area
shall consult and coordinate with City staff,
Chino Airport, and FAA during the planning
and design stage to ensure that
development plans and right-of-way street
improvements do not create any hazards
and comply with the California Airport
Land Use Planning Handbook published
by the Caltrans Division of Aeronautics and
the Ontario Development Code.

5.6 Open Space-Parkland
Development Standards
The Eucalyptus Business Park SpeciÞc Plan is
comprised of approximately 35.88 acres of
Open Space – Parkland land uses, which is
planned as part of for a larger public regional
park. The developer and the City of Ontario will
work together to ensure the regional park will
be constructed concurrently with the build out
of the Business Park portion of the SpeciÞc
Plan. The details of the partnership will be
included in the Development Agreements
accompanying the approval of the Eucalyptus
Business Park SpeciÞc Plan.
5053

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-1
CHAPTER 6

DESIGN GUIDELINES

6.1 Purpose and Intent
The design guidelines presented in this
chapter describe the quality and character of
the built environment expected for the
Eucalyptus Business Park Specific Plan area.

While the design guidelines provide direction,
they are meant to provide a certain level of
flexibility to allow creative expression during
the design of implementing development
projects.

The Eucalyptus Business Park Specific Plan
area’s visual identity will be expressed through
attractive building architecture with quality
materials, landscape, hardscape, and signage
elements. The design guidelines contained
herein are primarily focused on the business
park planning areas and are presented in a
manner that ensures consistent architectural
expression from building to building, while
allowing flexibility in modern-day building
design.

The objectives of these Design Guidelines are
as follows:
• To provide the City of Ontario assurance
that the Eucalyptus Business Park Specific
Plan area will develop in accordance with
the quality and character described within
this Specific Plan.
• To provide guidance to developers,
builders, engineers, architects, urban
planners, landscape architects, and other
professionals to achieve and maintain the
desired design quality.
• To provide an aesthetic benchmark for City
staff, the Planning Commission, and the
City Council in their review of the design of
future development projects in the Specific
Plan area.
• To provide guidelines that steer the
Eucalyptus Business Park to convey a
contemporary aesthetic theme and
character while allowing flexibility for
practical application and creative
expression.
• To provide guidelines for energy and water
use efficiency that can be implemented in
the site planning, design, and construction
of implementing development projects to
minimize waste deposited at landfills,
decrease fossil fuel consumption, and
reduce domestic water consumption.
• To ensure that the Specific Plan
implements the intent of The Ontario Plan
and the City’s Development Code.

The Design Guidelines presented herein apply
to all development within the Business Park
Planning Areas within the Eucalyptus Business
Park Specific Plan area.

6.2 Parkland Guidelines
The City's vision for the Grand Park has been
outlined in the Ontario Grand Park Conceptual
Master Plan. All future improvements within the
Grand Park including monumentation,
signage, trails, landscaping, etc. shall be
designed to be consistent with the Ontario
Grand Park Conceptual Master Plan to ensure
a consistent implementation of the City's
vision. Improvements within the Grand Park
shall be approved as part of the development
5054

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-2
plan for the respective planning area of the
EBPSP.

6.3 Business Park Design Theme
Planning Areas 1-6 are envisioned as a
contemporary business park containing
buildings that are grouped and arranged in
campus-like settings. The business park areas
will provide businesses with easy access to
regional transportation networks, proximity to
workers, and proximity to major ports and
airports.

The theme features a contemporary design
aesthetic, drawing on the ranch heritage of the
area, which provides architectural styling with
attractive detailing, visually-interesting
accents, and timeless features. Developments
within the business park area will provide
architecturally compatible sign design,
directed lighting, colorful and drought-tolerant
landscaping, and energy efficient design
features. Functional elements like loading
areas will be oriented inward with attractive
building façades facing outward toward the
public streets. Generous landscaped zones
along these frontages will enhance both the
visual appeal and functionality of the
circulation system.

6.4 Business Park Architecture
Guidelines
This section sets addresses the architectural
design of buildings in Planning Areas 1-6.

6.4.1 Architectural Theme
The architectural style of buildings in the
business park areas emphasizes building
massing over structural articulation. Buildings
are characterized by simple and distinct cubic
masses with interlocking volumes of wall
planes, colors, and materials to create visual
appeal. Additionally, architectural designs may
mix colors, materials, and textures to articulate
façades and create visual appeal.

Design elements are selected to ensure
compatibility in character, massing, detailing,
and exterior materials, reinforcing the
Conceptual Building Architecture
5055

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-3
aesthetic of the intended contemporary
design. While individual creativity and identity
of individual buildings are encouraged, all
buildings and planning areas are intended to
maintain design integrity and compatibility to
reinforce a cohesive image and campus-like
setting throughout the Specific Plan area

6.4.2 Building Form
Building form is a fundamental aspect of
architectural design, defined by elements such
as shape, mass (size), scale, proportion, and
articulation. Building façades visible from
public roads require careful attention but even
building façades not visible from public roads
or publicly accessible areas are encouraged to
follow the building form guidelines listed below.

The following guidelines apply to all business
park buildings to promote a visually cohesive,
attractive, and welcoming environment:
1) Simple geometric shapes shall be used as
the overall building form. Rectangular
forms are preferred, as they provide visual
balance and interest. Avoid overly complex
or arbitrary building shapes.
2) Long horizontal wall surfaces facing public
streets shall incorporate regular or periodic
changes in exterior materials, color,
decorative accents, or architectural details
to add visual interest.
3) Varying the size and shape of building
masses between neighboring buildings
visible from public streets is encouraged.
4) Buildings abutting and facing Public Street
‘A’ are encouraged to have varied setback
distances to provide a visually interesting
and attractive street frontage.
5) Make primary pedestrian entrances to
buildings (with the exception of service
doors and emergency exit doors) clearly
and easily identifiable through changes in
massing, color, and/or building materials.

Entries intended for visitors and the
general public should be recessed or
covered by architectural projections, roofs,
or arcades to provide shade and a
welcoming effect.
6) Architectural and trim detailing on building
façades shall be clean, simplistic, and not
overly complicated.
7) Materials applied to exterior wall elevations
shall turn the corner of the building to a
logical termination point in relation to
architectural features or massing.
8) Provide enhanced building corner and
entrance design to create visual anchors
that help define the building’s identity.

Conceptual Building Materials
5056

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-4

6.4.3 Building Materials, Colors, and
Textures
Building materials and colors play a pivotal role
in developing a clean, contemporary visual
environment. The following guidelines apply to
all business park buildings within the
Eucalyptus Business Park Specific Plan area,
with slight variations encouraged to provide
visual interest.
1) Primary exterior building materials shall
include concrete and similar materials. The
primary materials should be accented by
secondary materials including but not
limited to natural or fabricated stone, fire
resistant or synthetic wood siding
(horizontal or vertical), metals, or similar
materials.
2) Trim details may include metal finished in a
uniform color, plaster, or concrete
elements finished consistently with the
building treatment. Use of overly
extraneous themed detailing, like
oversized or excessive foam cornice caps,
foam moulding and window detailing is
discouraged.
3) Material transitions should occur at
intersecting planes, preferably at inside
corners where wall planes change, or at
points where architectural elements meet.
4) Primary exterior building colors should be
light earth and gray tones. Darker and/or
more vibrant accent colors may be used
strategically in focal point areas, such as
around building entrances and outdoor
gathering spaces.
5) The use of bright primary colors, overly
bold color applications, and arbitrary color
patterns that clash with the established
business park color palette are
discouraged, except in signage and logos.
6) Colors of exposed downspouts (only
permitted if not in public view), service
doors, and mechanical screens shall be
the same color as the adjacent building
wall.
7) If downspouts are needed in areas of
public view, they shall be designed as
internal downspouts.
8) Provide contrasting materials at corners
and vehicle entrances to visually enhance
the focal points of the buildings.

6.4.4 Windows and Doors
Patterns of window and door openings shall
correspond with the overall design of the
building and shall be consistent in form,
pattern, and color. The following windows and
doors guidelines apply to business park
buildings.
1) Where feasible, doors and windows on
individual building façades should be
arranged in a symmetrical and repetitive
pattern to promote visual continuity.

Conceptual Windows and Doors
5057

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-5
2) Window styles and trims shall be
consistent in form and color within each
planning area. All window trims on a given
building should share a uniform finish.
3) Unfinished or untreated metal frames and
gold-colored frames for windows and
doors are not permitted. Clear silver
anodized frames are acceptable.
4) Glass should be clear or lightly tinted with
subtle reflectivity. Highly reflective or silvertinted glass is not allowed. 5) All windows/glass and doors shall be inset
to rear of wall/panel to add interest and
provide shadow lines.

6.4.5 Rooftop Equipment Screening
Equipment and apparatuses placed on the
roofs of business park buildings are expected
to be screened from public view.
1) All rooftop mechanical, electrical, and
communication equipment shall be fully
screened from view from adjacent public
streets. Solar photovoltaic (PV) panels and
associated technologies may be visible
from public review if full screening of the PV
system is not feasible.
2) Screening elements shall be architecturally
integrated with the building design in terms
of form, materials, and color. Building
parapets is the preferred method of
screening but where parapets are not
feasible, mechanical screens may be used
Conceptual Building Corner Elevation Rendering
5058

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-6
but must appear as a natural extension of
the building's architecture. Screening
elements shall be of a uniform height,
color, and texture on a building sufficient to
conceal all rooftop equipment from view
from adjacent public streets.
3) Rooftop equipment should be placed away
from roof edges to minimize visibility and
reduce the height of required screening.
4) All conduits, piping, and utility lines
associated with rooftop equipment shall be
concealed from public view from adjacent
public streets.
5) Building roofs shall be designed to support
the installation of solar photovoltaic (PV)
panels and associated technologies.

6.5 Business Park Site Feature
Guidelines

6.5.1 Parking and Loading Areas
Areas serving commercial vehicles such as
loading dock areas and truck courts are
essential for the efficient operation of business
park facilities, providing access for loading,
unloading, and freight movement. However,
due to their scale and activity levels, these
areas can present conflicts with other
functions if not properly design and screened.

Below are design expectations for the effective
screening and use of loading docks and truck
courts.
1) Business park buildings fronting Public
Street ‘A’ shall not include loading docks
on any façades facing that street.
2) Commercial vehicle loading doors, service
docks, and outdoor equipment areas shall
be oriented or screened to minimize
visibility from public roads through the use
of solid walls and dense landscaping.

Screening for this purpose shall be a
minimum of 8 feet. A line of sight study will
determine max height required.
3) Loading and unloading activities by
commercial vehicles and trucks are
prohibited from occurring on or being
visible from public streets.
4) Sufficient queuing space shall be provided
in front of security gates to prevent
commercial vehicles and trucks from
stacking or idling on public streets while
waiting to enter.
5) Driveway entrances for trucks and service
vehicles shall be separated from
passenger vehicle traffic, pedestrian
pathways, and bicycle routes where
possible.
6) Conduit should be installed within truck
courts in logical, accessible locations to
accommodate the future addition of
electric truck charging stations,
anticipating advances in zero-emission
vehicle technology during the lifespan of
the business park.
7) Passenger car parking lots within business
park sites shall provide landscaping that
consist of shade trees and parking finger
islands.
8) Trees and parking fingers are not required
in truck courts, unless required to meet the
landscape coverage requirements.

6.5.2 Outdoor Employee Amenity Areas
The business park is expected to offer a wide
variety of job opportunities. For the comfort of
employees, outdoor employee amenities are
encouraged throughout the business park
area.
1) Outdoor break areas for employees may
be conveniently located and accessible to
each business park building and
5059

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-7
positioned away from or screened from
loading zones, trash enclosures, or other
utilitarian functions. Break areas may
serve one building or be shared among
multiple buildings.
2) In outdoor break areas, shade structures
such as canopies, trellises, or umbrellas
are encouraged to be provided to shade
and protect users from direct sun and light
rain. Outdoor break areas are encouraged
to provide weather-resistant seating and
tables, including a mix of options (e.g.,
individual benches, larger tables, etc.) to
accommodate different group sizes and
preferences.
3) Use of outdoor break areas shall be
encouraged by including features such as
early morning and evening decorative
lighting, outdoor power outlets, decorative
paving, and decorative features.
4) Bicycle racks shall be provided at each
building or in a common area that serves
multiple buildings. Outdoor bike racks shall
be secure, well-anchored, and placed in
well-lit areas with passive surveillance,
such as security cameras, to enhance
safety.

6.5.3 Outdoor Equipment Placement
Ground-mounted and wall-mounted utilitarian
equipment is expected to be needed to
support business park building operations.

The following guidelines are aimed at proper
placement.
1) Ground-mounted equipment, including but
not limited to mechanical and electrical
systems, emergency generators, boilers,
storage tanks, risers, and conduits should
be placed out of public review or be
screened from public view, particularly
from adjacent public streets and other
publicly accessible areas.
2) Electrical equipment rooms should be
located within the building envelope.

External projections, such as pop-outs or
shed-like structures, are discouraged.
3) Wall-mounted equipment should not be
installed in visually prominent locations on
building façades that face public roads or
areas with high visibility. Such equipment
should either be screened from view or
integrated into the building’s architectural
design to minimize visual impact.

6.5.4 Trash Enclosures
Thoughtfully designed trash enclosures are
essential components of a well-functioning and
visually cohesive business park. These
facilities serve a critical operational role while
also contributing to the overall aesthetic and
environmental quality of the development. The
following guidelines are intended to ensure that
trash and recycling enclosures are secure,
Conceptual Employee Amenity Areas
5060

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-8
functional, and architecturally integrated into
the site design.
1) All outdoor refuse containers shall be
screened within a permanent, lockable
and durable enclosure and should be
oriented so they are not visible from public
roads/views. The enclosure’s design shall
reflect the architectural style of adjacent
buildings and use similar, high-quality
materials.
2) Refuse collection areas shall be located
behind or to the side of buildings, away
from the building’s main entrance and
public view.
3) Design and placement of trash enclosures
shall meet Integrated Waste Department
requirements, including the requirements
for Sizing of Storage, Location of Collection
Area, Accessibility for Collection Vehicles,
and Collection of Sorted/Diverted Waste
Types.
4) Trash enclosures shall include green
waste/organics and recycling collection
bins.

6.5.5 Walls and Fences
Freestanding walls and fences play an
important role in defining property boundaries,
providing security, and screening service
areas within a business park. To maintain a
cohesive and high-quality visual environment,
these elements must be thoughtfully designed
to complement the architectural character of
adjacent buildings and the overall site design.

The following guidelines address the
placement, height, materials, and appearance
of freestanding walls and fences to ensure they
are both functional and visually integrated.
1) Walls and fences shall be designed to
complement the architectural style, colors,
and materials of adjacent buildings. A
consistent design theme for fencing and
walls shall be maintained throughout the
business park area to ensure a cohesive
appearance across parcels and tenant
spaces.
2) Walls and fences visible from public roads
or pedestrian areas should include
enhanced design treatments, such as
pilasters, decorative caps, or decorative
patterns, to reduce visual monotony.
3) High-quality, durable materials shall be
used such as decorative block or concrete
with textured or finished surfaces. Chain
link fencing cannot be used where visible
from the public view.
4) Walls and fences shall be designed for
long-term durability and ease of
maintenance. Finishes should be resistant
to graffiti and weathering.
5) Where walls or fences are located at major
public road intersections or project entries,
special design attention should be given to
include gateway features or architectural
detailing.

Conceptual Trash Enclosure
5061

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-9
6) Walls and fences used for security
purposes should balance safety with
aesthetics. Walls and fences in public view
should be built with attractive, durable
materials.

6.6 Energy Efficiency Guidelines
This Eucalyptus Business Park Specific Plan
promotes sustainable development practices
that align with California’s long-term
environmental goals and energy efficiency
standards. These guidelines are intended to
encourage the thoughtful integration of
energy-efficient design, construction, and
operational strategies throughout the business
park. By reducing energy consumption,
lowering greenhouse gas emissions, and
supporting the use of renewable technologies,
these standards not only minimize
environmental impacts but also contribute to
long-term cost savings and improved building
performance for tenants and property owners.

The following guidelines apply to all new
construction, major renovations, and site
improvements within the Specific Plan area.
1) All new construction and major
renovations shall meet or exceed the
requirements specified in the California
Green Building Standards Code
(CALGreen Code) and Title 24 energy
efficiency requirements.
2) High-performance insulation, cool roofing
materials, energy-efficient windows, and
air-tight construction is encouraged to
exceed CALGreen Code standards to
minimize thermal loss and reduce HVAC
demand.
3) LED lighting or equivalent shall be used for
all interior and exterior applications.
4) Use of ENERGY STAR® certified
appliances and daylight sensors, motion
detectors, and programmable timers on
lighting fixtures are encouraged to
minimize unnecessary energy use.
5) Skylights are encouraged on at least 1% of
building rooftops above storage spaces to
reduce the need for artificial light.
6) Installation of smart thermostats and
automated energy management systems
are encouraged to improve heating,
cooling, and ventilation efficiency.
7) Building roofs shall be designed to
accommodate solar photovoltaic (PV)
systems. Associated battery storage
systems are encouraged as feasible to
support energy resilience and reduce peak
load.
8) Electric Vehicle (EV) charging stations and
infrastructure for expansion is encouraged
to exceed CALGreen Code standards.
9) Building tenants shall use zero-emission
equipment for building operations involving
goods movement, such as forklifts and
yard hostlers.
10) Implementing projects shall follow the City
of Ontario Climate Action Plan (CCAP)
Screening Table Measures to achieve a
minimum of 100 points per the Screening
Table.

6.7 Lighting Guidelines
Outdoor lighting is an essential architectural
component that provides aesthetic appeal,
enhances safe pedestrian and vehicular
circulation, and adds to security. Lighting
within the public rights-of-way shall adhere to
applicable City of Ontario requirements. All
other lighting on private property within the
Specific area shall adhere to the following
guidelines.
1) Minimize glare and “spill over” light onto
public streets and adjacent properties by
5062

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-10
using downward-directed lights and/or
cutoff devises on outdoor lighting fixtures,
including spotlights, floodlights, electrical
reflectors, and other means of illumination
for signs, structures, parking, loading,
unloading, and similar areas. Where
desired, illuminate trees and other
landscape features by concealed up light
fixtures. Limit light spillover or trespass to
one-quarter foot-candle or less, measured
from within five feet of any adjacent
property line.
2) Select all lighting fixtures from the same or
complementary family of fixtures with
respect to design, materials, fixture color,
and light color. Use of LED lighting is
encouraged.
3) Lights should be unbreakable plastic,
recessed, or otherwise designed to reduce
the problems associated with damage and
replacement of fixtures.
4) Neon and similar types of lighting are
prohibited.
5) Locate all electrical meter pedestals and
light switch/control equipment in areas
with minimum public visibility or screen
them with appropriate plant materials.
6) Along sidewalks and walkways, the use of
low mounted fixtures (ground or bollard
height), which reinforce the pedestrian
scaled, are encouraged.
7) Use exterior lights to accent building
entrances, plazas, activity areas, and
special features.
8) Provide lighting to illuminate parking lots
and their pedestrian links that provide
more than five parking spaces for use by
the general public.
9) Provide lighting to illuminate aisles and
passageways within a building complex.
10) High-Pressure Sodium (HPS) light fixtures
are prohibited for site lighting.
11) Lighting is prohibited that could be
mistaken for airport lighting or that would
create glare in the eyes of pilots of aircraft
using the nearby Chino Airport or Ontario
International Airport.

6.8 Signage Guidelines
Signage will identify building occupants in the
business park area and ensure the efficient
circulation of vehicle traffic by identifying
vehicular entry points and directing vehicles to
their on-site destinations. Also, signage will
enhance the pedestrian experience through
wayfinding component such as directories,
directional signage, and destination identifiers.

A Sign Program shall be approved by the City
for the Specific Plan area prior to any sign
being installed within the Specific Plan area.

Clear, concise, and easy-to-understand
signage that is also visually appealing is vitally
important for positive worker and visitor
experiences in the Specific Plan area. General
design requirements for signage are as follows:
1) Freestanding signs associated with
buildings should be compatible with and
complementary to the building’s exterior
materials, colors, and finishes.
2) The dimensions and shape of freestanding signs and sign panels or elements mounted on building façades or
marquees shall be scaled proportionately
to the architecture.
3) All signs shall be contained within the
parcel to which it is applicable and shall be
so oriented as to preclude hazardous
obstructions to person and/or vision of
pedestrians and/or vehicle operators.
4) Building occupant identification signage
shall be in keeping with the character
5063

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-11
established for the Specific Plan area with
variations allowed to accommodate
individual user identities/corporate
branding standards.
5) All signs are expected to be of the highest
quality to pass eyelevel examination and
scrutiny, and shall comply with the
following fabrication specifications:
a. Signs should be constructed to
eliminate burrs, dents, cutting
edges and sharp corners;
b. Surfaces which are intended to be
flat should be without dents,
bulges, oil canning, excessive,
gaps, or other physical deformities;
c. All fasteners shall be concealed;
d. Access panels shall be tight-fitting,
light-proof and flush with adjacent
surfaces;
e. Manufacturers’ procedures that
are recommended regarding
expansion/contraction, fastening
and restraining of acrylic plastic
shall be followed; and
f. Painted, polished and plated
surfaces shall be unblemished in
the finished work.
6) Prohibited sign components include the
following:
a. Letters with exposed fastening and
unfinished edges (unless
architecturally consistent);
b. Paper, cardboard, Styrofoam or
untreated cloth;
c. Visible moving parts or simulated
moving parts by means of
fluttering, rotation, or reflecting
devices; and
d. Flashing and strobing.
7) All conductors, transformers, cabinets,
housing, and other equipment for the
illumination of signs shall be concealed
and/or incorporated into the building
architecture.
8) Signs shall be constructed so as to not
have exposed wiring, raceways, ballasts,
conduit, transformers, or the like.
9) Direction signs may be located at any
vehicular or pedestrian decision point.
10) Vehicular direction signs shall clearly direct
to destination anchors within the Specific
Plan area, on-site parking areas, and truck
routes.

Conceptual Building Signages
5064

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-12
11) Vehicular direction signs shall be
consistent in size, shape, and design
throughout the Specific Plan area.
12) Typography on vehicular direction signs
should be legible and have enough
contrast to be read from an appropriate
windshield viewing distance.
13) Typography on vehicular direction signs
should be legible and have enough
contrast to be read from an appropriate
windshield viewing distance.
14) All direction signs and general information
signs (e.g., restrooms, telephones, fire
extinguishers, elevators, escalators, stairs)
throughout the Specific Plan area shall
incorporate the appropriate identity
symbol as established by the Society of
Environmental Graphic Design (SEGD)
and comply with all State, local and federal
regulations.
15) All traffic control signs, whether on public
or private property, shall conform to the
California Manual on Uniform Traffic
Control Devices (MUTCD).
16) All signage shall comply with the City of
Ontario Development Code’s Sign
Regulations.

6.9 Landscape Guidelines
Landscape design guidelines provided herein
establish landscape principles and standards
that shall apply to all planning areas within the
Eucalyptus Business Park Specific Plan area.

The intent is to ensure that plant materials,
entries and monuments, streetscapes, and
other amenities are compatible with the overall
themes of the business park area and the
parkland area.

The landscape design guidelines provided
herein are not intended to establish a set of
rigid landscaping requirements. These
landscape guidelines are intended to be
flexible and are subject to modification over
time. However, it is critical to the Specific Plan’s
long-term design integrity that any deviations
from these guidelines are in keeping with the
spirit of the core elements of the overall theme
described herein to ensure a cohesive and
unified landscape concept across the
Eucalyptus Business Park Specific Plan area.

As shown on Figure 6-1, Conceptual
Landscape Plan, landscaping will occur
primarily at street corners, along roadways,
and at building entrances, and in passenger
car parking lots.

Primary and secondary entry treatments
provide a welcoming setting for the employees
and visitors to the Specific Plan area. Primary
Conceptual Regulatory Signage
5065

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-13
entry treatments featuring signs and
landscaping will occur at the corners of
Eucalyptus Avenue and Campus Avenue and
Eucalyptus Avenue and Grove Avenue.

Secondary entry treatments will feature accent
trees, shrubs, and groundcovers occur at the
corners of entrances to the Specific Plan area.

Building corners and entrances facing public
streets shall feature enhanced landscaping
that complements the overall design theme of
the Specific Plan area. These landscaped
elements will be curated to create a visually
appealing environment. Placement of trees,
shrubs, and ground cover will serve to soften
building facades and provide natural screening
where appropriate, ensuring that structures
are integrated harmoniously into their
surroundings rather than dominating the
streetscape.

Streetscape landscaping includes a
combination of evergreen and deciduous
trees, shrubs, and groundcovers to provide a
visually pleasing experience for pedestrians,
bicyclists, and motorists.

6.9.1 Plant Palette
The plant palette for the Eucalyptus Business
Park Specific Plan area includes evergreen
and deciduous trees, shrubs and ground
covers, and grasses that are commonly used
throughout Southern California. Many of the
plant materials are water-efficient species
native to Southern California or naturalized to
the Southern California climate.

Table 6-1, Plant Palette, provides a list of plant
materials approved for use in the Specific Plan
area. The plants listed in Table 6-1 establish a
base palette for the Specific Plan area’s
landscape design. Other similar plant
materials may be substituted for species listed
in Table 6-1, provided the alternative plants are
drought resistant and complement the Specific
Plan area’s overall design theme.
5066

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-14
Table 6-1 Plant Palette
Botanical Name Common Name Application Water Use
Trees
Cedrus deodara Deodar Cedar Evergreen Specimen M
Cercidium x ‘desert
museum
Desert Museum Palo Verde Accent Tree L
Cercis c. ‘forest pansy’ Eastern Redbud Street Tree/Water Quality M Chitalpa T. ‘morning cloud’ Chitalpa Street Tree L
Geijera parviflora Australian Willow Canopy Tree/Background L Koelreuteria bipinnata Chinese Flame Tree Street Tree L Lagerstroemia f ‘natchez’ Crape Myrtle Accent Tree/Water Quality M Lophostemon confertus Brisbane Box Background Tree M
Olea europea ‘swan hill’ Swan Hill Fruitless Olive Accent Tree L Pinus eldarica Afghan Pine Street Tree/Background M
Pinus halepensis Aleppo Pine Evergreen Screen M
Pistachia chinensis Chinese Pistache Street Tree M
Platanus a. ‘bloodgood’ Lodone Plane Tree Street Tree/Background M Platanus racemosa California Sycamore Water Quality/Canopy Tree M Podocarpus gracilior Fern Pine Street Tree/Canopy Tree M Quercus agrifolia Coast Live Oak Street Tree/Accent Tree L Quercus suber Cork Oak Street Tree L
Quercus ilex Holly Oak Street Tree/Canopy Tree L
Shrubs, Grasses, and Groundcovers
Acacia redolens Acacia Groundcover L
Agave americana Century Plant Accent L
Agave attenuata ‘blue glow’ Blue Glow Agave Accent L
Aloe arborescens Torch Aloe Accent/Background L
Aloe blue elf Blue Elf Aloe Accent L
Aloe petricola Stone Aloe Accent L
Aloe striata Coral Aloe Accent L
Arbutus unedo ‘compacta’ Dwarf Strawberry Tree Background L Baccharis x ‘centennial’ Centennial Coyote Brush Water Quality L Bouteloua g. ‘blond
ambition’ Blue Grama Grass Mid-ground L
Bulbine frutescens Bulbine Flowering Accent L
Calandrinia spectabilis Rock Purslane Flowering Accent L Callistemon ‘little john’ Dwarf Callistemon Mid-ground L Carissa m. ‘green carpet’ Dwarf Natal Plum Groundcover M Carex divulsa Berkeley Sedge Groundcover/Foreground L
Cotyledon orbiculata Pig’s Ear Foreground/Accent L
Dianella ‘little rev’ Little Rev Flax Lily Foreground L Dianella t. ‘variegata’ Variegated Flax Lily Foregound/Mid-ground M Echeveria a. ‘lipstick’ Echeveria Accent L
Festuca mairei Atlas Fescue Foreground/Mid-ground L
Hepearlor parviflora Red Yucca Succulent Accent L
Hesperalie ‘brakelights’ Brakelights Yucca Mid-ground/Accent L Juncus patens California Gray Rush Water Quality L
Lantana ‘new gold’ New Gold Lantana Groundcover/Foreground L Leymus c. ‘canyon prince’ Canyon Prince Wild Rye Mid-ground/Water Quality L 5067

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-15
Botanical Name Common Name Application Water Use
Muhlenbergia c. ‘regal mist’ Pink Muhly Mid-ground/Water Quality L Myoporum parifolium Ncn Groundcover M
Olea ‘montra’ Little Ollie Mid-ground L
Rhaphiolepis indica ‘clara’ Indian Hawthorn Mid-ground/Background M Rosmarinus o. ‘prostratus’ Prostrate Rosemary Groundcover L Salvia greggii Autumn Sage Mid-ground L
Salvia L. ‘santa barbra’ Santa Barbra Mexican
Sage Mid-ground/Water Quality L
Senecio Serpens Blue Chalk Sticks Succulent Groundcover L Turf ‘marathon iie’ Sodded Turf Groundcover H
Westringia ‘wynyabbie gem’ Coast Rosemary Background L
Conceptual Landscape Materials
5068
PA 1 PA2
BUSINESS PARK ~ BUSINESS PARK

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
PA9

OPEN SPACE

13.89AC.

PA3

BUSINESS PARK
~~ ~ 1~~ 18.21 AC. l-----~~---------j,~1-------------------------t PA4

BUSINESS PARK

18.19 AC.
s
:;!
~
ii
PAS

BUSINESS PARK

37.76AC.

EUCALYPTUS AVE
Specific Plan Area
Primary Corner Treatment
(Figure 6-8)
Campus Avenue Streetscape
(Figure 6-2)
Bon View Avenue Streetscape
(Figure 6-3)
Grove Avenue Streetscape
(Figure 6-4)
Source(s): Esri, Nearmap Imagery (January 2025), Michael Baker (11-20-2025), San Bernardino County (2025) 0 200 400 800
---Feet
Secondary Corner Treatment
(Figure 6-9)
Walker Avenue Streetscape
(Figure 6-5)
Eucalyptus Avenue Streetscape
(Figure 6-6)
Public Street 'A' Streetscape
(Figure 6-7)
PA6

BUSINESS PARK

37.71 AC.

Figure 6-1
Conceptual Landscape Plan
6-16
5069

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-17

6.9.2 Irrigation
The following general irrigation concepts shall
be considered in the design and installation of
irrigation systems within the Eucalyptus
Business Park Specific Plan area.
1) All landscaped areas should be equipped
with a permanent, automatic, underground
irrigation system. Drip systems are
encouraged in all areas needing irrigation.

Irrigation systems must conform to all City
of Ontario requirements.
2) Irrigation systems should be designed to
apply water slowly, allowing plants to be
deep soaked and to reduce run-off.
3) Connect the irrigation system to the
recycled water conveyance system.
4) “Pop-up” type sprinkler heads may be
used adjacent to all walks, drives, curbs
(car overhangs), parking areas and public
right-of-way but must be designed to
prevent all run-off and overspray.
5) The design of irrigation systems,
particularly the location of controller boxes,
valves, and other above-ground
equipment (e.g., backflow prevention
devices), shall be incorporated into the
overall landscaping design. Where
aboveground equipment is provided, it
shall be screened or otherwise removed
from public view.
6) The irrigation system shall be programmed
to operate between 6:00pm and 6:00am.

6.10 Streetscape Guidelines
Streetscape landscaping is integral to creating
a sense of place within the Specific Plan area.

Furthermore, streetscapes serve as a way to
screen undesirable views from public views.

Within the Specific Plan area, streetscapes are
planted with a combination of evergreen and
deciduous trees, low shrubs, and
groundcovers to create a pleasing experience
for pedestrians, bicyclists, and motorists.

The conceptual streetscape landscape
treatments within the Specific Plan area are
presented in the following sections.

6.10.1 Campus Avenue
The segment of Campus Avenue abutting the
Eucalyptus Business Park Specific Plan area
features landscaping within parkways on both
sides of the street. Parkways include a curbadjacent park strip planted with deciduous trees, low flowering groundcovers, a 5-footwide sidewalk, and an 8-foot-wide multipurpose trail. Evergreen and deciduous trees are planted beyond the right-of-way on both
sides of the street to provide pedestrians using
the sidewalk with additional opportunities for
shade and to screen undesirable views. The
typical Campus Avenue Streetscape is
illustrated on Figure 6-2, Campus Avenue
Streetscape.

6.10.2 Bon View Avenue
The typical section of Bon View Avenue
features landscaping within parkways on both
sides of the street. Parkways include a curbadjacent park strip planted with evergreen trees and low flowering groundcovers, as well
as a 5-foot-wide sidewalk. Evergreen trees are
planted beyond the right-of-way on both sides
of the street to provide pedestrians using the
sidewalk with additional opportunities for
shade and to screen undesirable views. The
typical Walker Avenue Streetscape is
illustrated on Figure 6-3, Bon View Avenue
Streetscape.

6.10.3 Grove Avenue
The segment of Grove Avenue within the
Eucalyptus Business Park Specific Plan area
features two landscaped components: a 28-
foot-wide landscaped raised median and
5070

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-18
parkways on both sides of the street. The
landscaped raised median is planted with
thematic deciduous and evergreen trees at to
reinforce the theme established through
previous development south of the Eucalyptus
Specific Plan area. Parkways include a curbadjacent park strip planted with deciduous trees and low flowering groundcovers, with a
5-foot-wide sidewalk along the east and west
side of the street and an 8-foot multi-purpose
trail along the east providing passive
recreational opportunities. Deciduous trees
are planted beyond the right-of-way on both
sides of the street to provide pedestrians using
the sidewalk with additional opportunities for
shade and to buffer development. The typical
Grove Avenue Streetscape is illustrated on
Figure 6-4, Grove Avenue Streetscape.

6.10.4 Walker Avenue
The segment of Walker Avenue abutting the
Eucalyptus Business Park Specific Plan area
features landscaping within parkways on the
west side of the street. The Parkway includes
a curb-adjacent park strip planted with
deciduous trees, low flowering groundcovers,
and a 5-foot-wide sidewalk. Evergreen and
deciduous trees are planted beyond the rightof-way to provide pedestrians using the sidewalk with additional opportunities for
shade and to screen undesirable views. An 8-
foot-wide multi-purpose trail is also provided
along the eastern side of Walker Avenue to
offer passive recreational opportunities. The
typical Walker Avenue Streetscape is
illustrated on Figure 6-5, Walker Avenue
Streetscape.

6.10.5 Eucalyptus Avenue
The segment of Eucalyptus Avenue abutting
the Eucalyptus Business Park Specific Plan
area features landscaping within parkways
along the north side of the street. Parkways
include a curb-adjacent park strip planted with
deciduous trees, low flowering groundcovers,
and a 5-foot-wide sidewalk. Evergreen and
deciduous trees are planted beyond the rightof-way on both sides of the street to provide pedestrians using the sidewalk with additional
opportunities for shade and to screen
undesirable views. An 8-foot-wide multipurpose trail is also provided along the northern side of Eucalyptus Avenue to offer
passive recreational opportunities. The typical
Eucalyptus Avenue Streetscape is illustrated
on Figure 6-6, Eucalyptus Avenue
Streetscape.

6.10.6 Public Street ‘A’
The typical section of Public Street ‘A’ features
landscaping within parkways on both sides of
the street. Parkways include a curb-adjacent
park strip planted with evergreen trees and low
flowering groundcovers, and a 5-foot-wide
sidewalk. Evergreen and deciduous trees are
planted beyond the right-of-way on both sides
of the street to provide pedestrians using the
sidewalk with additional opportunities for
shade and to screen undesirable views. The
typical Public Street ‘A’ Streetscape is
illustrated on Figure 6-7, Public Street ‘A’
Streetscape.
5071

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN

CAMPUS AVENUE
7' WIDE PARKWAY L.....~~~-----+~ ..:....:,.,~~.,........\~ ....:....:,,--1-~--,-----,\--...,.....:,....,_,.'-,-~+----.--'"'-c-,~--,,,::~....-~-1--r----,------\,------.~--l---c------,-----\r------.-i 5' WIDE SIDEWALK Plan View
23'

LANDSCAPE
IV)
w
3:

Section
35'

NEIGHBORHOOD
EDGE
Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil
I _____ I
~
84'
-ir-,1--¥----..- ~-.,--'
35'

NEIGHBORHOOD
EDGE
8' WIDE MULTI-PURPOSE TRAIL
15' WIDE LANDSCAPE SETBACK

CAMPUS AVENUE STREETSCAPE
HEIGHT X SPREAD:
40'X 30'
SPACING·
30'O.C.

DESCRIPTION:

DECIDUOUS
HEIGHT X SPREAD:
35'X20'

SPACING
20'O.C.

DESCRIPTION:

DECIDUOUS
HEIGHT X SPREAD:
70'X 20'
SPACING·
20'O.C.

DESCRIPTION:

EVERGREEN
Figure 6-2
Campus Avenue Streetscape
6-19
5072

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
u

CDJ BON VIEW AVENUE
1:&0...... =:::'.~_ =, :;;;;;;!,_._ =-;;;;;,-="'t =®.... ==~~- ;;;;;;:1.,...~=- =-;;;;;,~1=_ "'t:: ,@.... ===~-;;;;;;=1-~=- -;;;;;,=1=_ "'t =®.... =;;;;;; =~-=j ;;;;;;-~-= ::~,®.... = ==~-;;;;;;=j+-1=_ =-;;;;;,-=-;;;;;,=-='°i:: ,®.... ===~-;;;;;;==l+' =-;;;;;,~ -;;;;;, = -= c:t::: ,@...... ~:::'.~~ =, :! ;;;;;;...... =-;;;;;,~ +=Qj_, 1: ~:g~ f1~~~ ~~ 20' WIDE LANDSCAPE SETBACK I 1 1 181 1 11 1 1 1111111111 11 11 18 1 11 11 11
Plan View
Section
Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil
48'
ROADWAY .O.W. L/S

SETBACK
29'

NEIGHBORHOOD EDGE
0 0

QUERCUS ILEX
(HOLLY OAK)

PINUS ELDARICA
(AFGHAN PINE)
-ORPODOCARPUS

GRACILIOR
(FERN PINE)

PA RKWAY PLA NTING

SHALL NOT EXCEED
18" IN HEIG HT, TYP.

HEIGHT X SPREAD
40' X 30'

SPACING
40'O.C

DESCRIPTION

EVERGREEN

HEIGHT X SPREAD
40' X 30'

SPACING
30'O.C

DESCRIPTION

EVERGREEN
NOTE: EASEMENT WIDTH REQUIREMENT IS SUBJECTTO CHANGE

BASED ON FINDINGS OF CITY-APPROVED HYDRAULIC STUDIES,
MASTER PLAN UPDATES, AND PROJECT FINAL DESIGN.

Figure 6-3
Bon View Avenue Streetscape
6-20
5073

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
(IlJ
;~
~ ~ 28' RAISEDMEDIAN
Plan View
>-
(./)

GROVE AVENUE
~ --,t--~2=0' ____ ~20~' -----~28_' -------,r--------,/---~2~8' ____ _ ~'2fJ~---+- L/S SETBACK R.O,W. ROADWAY RAISED ROADWAY R.O.W.

Section
40'

NEIGHBORHOOD
EDGE
Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil
MEDIAN 40'

NEIGHBORHOOD
EDGE
>-
(./)
4'.
w

GROVE AVENUE STREETSCAPE
®
0 0

PLATANUSA
'BLOODGOOD'
(LONDON PLANE TREE)
CERCIS C. 'FOREST
PANSY'
(EASTERN REDBUD)

PINUS ELDARICA
(AFGHAN PINE)

HEIGHT X SPREAD
40'X30'
SPACING:
40' O.C

DESCRIPTION

DECIDUOUS
HEIGHT X SPREAD·
20'X 15'

SPACING
15'O.C
DESCRIPTION:

DECIDUOUS

HEIGHT X SPREAD
40'X30'

SPACING
30'O.C.

DESCRIPTION

EVERGREEN
--- PARKWAY PLA NTING

SHALL NOT EXC EED
18" IN HEIGHT, TYP.

Figure 6-4
Grove Avenue Streetscape
6-21
5074

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN

WALKER AVENUE
,;;;;;;;;=t'====:e=~ = t'====:e=~ = :f====:,===F=:f====:,===F=:f====:,===F=:f==,===F=:f==,===\==, 7' WIDE LANDSCAPE AREA ~--.---..,.._---.------.------.--l----.------'<-------,------,-+-r-----v------r-----r-----r--+-T-----¾----+------'.-------.-----.---.-+--,-..,.._----,-----,--\----,----"<r------,------,------,-+' 5' WIDE SIDEWALK 8' MULTI-PURPOSE TRAIL
23' WIDE LANDSCAPE SETBACK
i:,,... --.../~----"' "-----------"- -- """------" ,,,c_-------- ./~-----"' Plan View
IV)
w
3:: 23'

L/S SETBACK
35'

NEIGHBORHOOD
EDGE
Section
I I ~
32' 25'

ROADWAY ROADWAY
57'
Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil
l 7' ~s-l s· f 1 L/S/WMULT
PURPOSE TRAIL 12' 23'
R.O.W. L/S SETBACK
35'

NEIGHBORHOOD
EDGE
l 19·
1 TO BE 7'

CONSTRUCTED

BY OTHERS
IV)
<(
w

WALKER AVENUE STREETSCAPE
0 0

PA RKWAY PLANTING

SHALL NOT EXCEED
18" IN HEIGHT, TYP.

HEIGHT X SPREAD:

KOELREUTERIA JO' X JO'
BIPINNATA SPACING:
(CHINESE FLAME TREE) 6~ic~IPTION·

LOPHOSTEMON

CONFERTUS
(BRISBANE BOX)

DECIDUOUS
HEIGHT X SPREAD:
15'X 15'
SPACING:
20'O.C
DESCRIPTION:

EVERGREEN
Figure 6-5
Walker Avenue Streetscape
6-22
5075

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
Plan View
15'
L/S

SETBACK
L r L r L 1 ,, 1
I I ~
I I
~ 23' 12' 42' 42' 12' 23' ~ oz _,__~L=/S- ------,1- R.~O~.W------,I. ____ R_O_A_D=W- A_Y ___ _,_ ___ R_O_A_D=W- A_ Y ___ _,_R __ ~o~.w-. -~L/~s- _,.._,O

BUFFER BUFFER VJ
Section
35'

NEIGHBORHOOD
EDGE
Source(s): Ridge Landscape Architects (12-1 8-2025)
Ef'l'lJ Affltw IIEil
84' 35'

NEIGHBORHOOD
EDGE

EUCALYPTUS AVENUE STREETSCAPE
0 PODOCARPUS

GRACILIOR
(FERN PINE)
~ ~ PISTACIACHINENSIS
(CHI NESE PISTACHE)

PARKWAY PLANTING

SHALL NOT EXCEED
18" IN HEIG HT, TYP.

HEIGHT X SPREAD:
40'X30'
SPACING:
30'O.C
DESCRIPTION:

EVERGREEN
HEIGHT X SPREAD:
40'X 40'

SPACING
30' O.C

DESCRIPTION

DECIDUOUS
Figure 6-6
Eucalyptus Avenue Streetscape
6-23
5076

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN

PUBLIC STREET 'A'
~ ~ r===~- ~ r===~-~r===~;;;;;;;;;;~,===~,;;;;;;;~,===~ ~ ~,===~~ ~,====;:;;;;;;:; 7' WIDE PARKWAY ~:::,L'---\r'--'----.11.""-1'!:::,LJ-----'----'----'"",:;jO!:::,LJ-----'----'----'"",:;jO!:::,LJ-----'----'----'"",:;jO!:::,LJ--=::----'----'"",:;jO!=""----'----'--'~K"'-r"7""'--'-------. 5' WI DE SIDEWALK Plan View
Section
:r:
f0,:
0 z 12' 20' 20'
R.O.W. ROADWAY ROADWAY
Source(s): Ridge Landscape Architects (06-04-2025)
Ef'l'lJ Affltw IIEil
12'
R.O.W.
l
+ 20' WIDE LANDSCAPE SETBACK

GRAND PARK AVENUE STREETSCAPE
0 0

CEDRUS DEODARA
OR

PINUS HALEPENSIS
(DEODAR CEDAR

OR ALEPPO PINE)

QUERCUS AGRIFOLIA
(COAST LIVE OAK)

PARKWAY PLANTING

SHALL NOT EXCEED
18" IN HEIGHT, TYP.

HEIGHT X SPREAD:

XX' XXX'
SPACING:

XX' O.C.

DESCRIPTION:

DECIDUOUS
HEIGHT X SPREAD:
35' X 35'
SPACING:
40'O.C.

DESCRIPTION:

EVERGREEN
Figure 6-7
Public Street 'A' Streetscape
6-24
5077

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-25

6.11 Entries and Monuments
Guidelines
Entry and corner monument treatments are
designed to provide distinct visuals to
emphasize the Eucalyptus Business Park
Specific Plan area’s aesthetic. Hardscape and
landscape features at entry and corner
monument locations shall provide adequate
“line-of-sight” for motorists and shall comply
with applicable City design standards and
specifications. Monumentation shall not be
located within the public street right-of-way.

Implemented entry and corner treatments
should be flexible to respond to physical
contexts and the needs and desires of specific
tenants and may differ slightly from the
concepts presented herein; however, all entry
and corner treatments within the Specific Plan
area shall be consistent in theme.

6.11.1 Primary Corner Treatments
Primary corner monuments are located at the
northeast corner of Eucalyptus Avenue and
Campus Avenue and at the northeast and
northwest corners of Eucalyptus Avenue and
Grove Avenue. The primary corner treatments
features orchard tree groves and the primary
monument signage. Figure 6-8, Conceptual
Primary Corner Treatment, conceptually
illustrates the primary corner treatments.

6.11.2 Secondary Corner Treatments
Secondary corner monuments are located at
the entrances into the Specific Plan area from
the northern edge of Campus Avenue, Bon
View Avenue, Grove Avenue, and Walker
Avenue; from the southern edge of Bon View
Avenue and Grove Avenue. The secondary
corner treatments features orchard tree
groves, shrubs, and groundcovers. Figure 6-9,
Conceptual Tenant Monumentation
5078

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-26
Conceptual Secondary Corner Treatment,
conceptually illustrates the secondary corner
treatments.

The final locations and design details of the
water quality basins will be determined when
buildings are designed and oriented during the
implementation of the Eucalyptus Business
Park Specific Plan area.
5079
w
:::>
z
w
> <(
(./)
:::>
a...
~
<(
u
LEGEND
l. PRIMARY MONUMENT- REFER TO SEPARATE MONUMENT ELEVATIONS

2. MULTI-PURPOSE TRAIL

3. FRUITLESS OLIVE GROVE AT CORNER

4. DECORATIVE SHRUB ROWS TO ENHANCE GEOMETRY

5. FLOWERING GROUNDCOVER BETWEEN SHRUB ROWS

6. PUBLIC SIDEWALK
Plan View
Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN

FRUITLESS OLIVE GROVE

GEOMETRIC PLANTING SCHEME

PRIMARY CORNER STREETSCAPE

OLEA EUROPAEA
'SWAN HILL'
(SWAN HILL FRUITLESS
OLIVE)

HEIGHT X SPREAD
25' X 20'

SPACING
18'0.C

DESCRIPTION

EVERGREEN

HEIGHT X SPREAD
PLATANUS A 40' X 30'
'BLOODGOOD' ~~~6NG
(LONDON PLANE TREE) DESCRIPTION

QUERCUS SUBER
(CORK OAK)

PISTACIA CHINENSIS
(CHINESE PISTACHE)

DECIDUOUS

HEIGHT X SPREAD
7CY X2CY

SPACING
20'O.C

DESCRIPTION

EVERGREEN

HEIGHT X SPREAD
40' X 40'

SPACING
3<Y O.C

DESCRIPTION

DECIDUOUS

EUCALYPTUS AVENUE
Figure 6-8
Conceptual Primary Corner Treatment
6-27
5080

SECONDARY CORNER STREETSCAPE
HEIGHT X SPREAD OLEA EUROPAEA 25'X20' 'SWAN HILL' SPACING (SWAN HILL FRUITLESS 18'0.C

OLIVE) DESCRIPTION

EVERGREEN

HEIGHT X SPREAD
40' X30'

QUERCUS ILEX SPACING
(HOLLY OAK) 40'0.C

DESCRIPTION

EVERGREEN
PINUS ELDARICA HEIGHT X SPREAD (AFGHAN PINE) 40' X30'
-OR- SPACING
PODOCARPUS 30'0.C

GRACILIOR DESCRIPTION
(FERN PINE) EVERGREEN
HEIGHT X SPREAD @ 40' X40'

PISTACIACHINENSIS SPACING
(CHINESE PISTACHE) 30'0.C

DESCRIPTION

DECIDUOUS
Plan View
Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
w
::,
z
w
> <(
~ w
>
z
0 Cl'.)
LEGEND
l . MULTI-PURPOSE TR AIL

2. FRUITLESS OLIVE GROVE AT CORNER

3. DECORATIVE SHRUB ROWS TO ENHANCE GEOMETRY

4. FLOWERING GROUNDCOVER BETWEEN SHRUB ROWS EUCALYPTUS AVENUE 5. PUBLIC SIDEWALK Figure 6-9
Conceptual Secondary Corner Treatment
6-28
5081

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
6-29

6.12 Landscape Interface
Within the Specific Plan area, landscape
treatments have been designed to address the
interface between the Business Park and the
Open Space – Parkland land use. The
interface exhibits presented in this section are
not intended to represent a literal design, but
rather serve as guidelines, which may be
subject to modification over time.

As shown in Figure 6-10, Conceptual
Landscape Interface – Business Park to Open
Space – Parkland, the 60-foot-wide ROW
Public Street ‘A’ splits up the two land use
districts. Within the Business Park planning
areas, landscape buffers, parking, and driveaisles can provide further separation between the Business Park buildings and the edge of
the public park areas.

6.13 Water Quality Basin
Guidelines
Water quality basins may be provided within
the Specific Plan area to treat stormwater
before the flows ultimately drain into the storm
drain facilities. The water quality basins may
include contoured basin edges for a natural
look, and landscaping around the perimeter of
the basin to screen public views of the basin.

Swales may be no greater than 40% of the
landscape area width to allow for ornamental
landscaping, although landscaping may have
limitations where necessary to deter the
attraction of birds to the basins, which can be
a hazard to aircraft using the nearby Chino
Airport and Ontario International Airport.

Other wildlife deterrents that may be
considered include floating covers, bird balls,
netting, and basins designed to be linear and
narrow with steep sides and rip-rap lining.

6.14 Stormwater Infiltration Areas
Guidelines
Stormwater infiltration areas within landscape
areas shall be designed to be no greater than
40% of the landscape area width to allow for
ornamental landscape. Stormwater infiltration
devices located in landscape areas shall be
reviewed and plans approved by the City of
Ontario’s Landscape Planning Division. Any
stormwater devices in parkway and landscape
areas shall not displace required tree
locations.
5082

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
12' 20' 20 12' 20'

PARK EDGE BY OTHERS ROADWAY ROADWAY LANDSCAPE
R.O.W.

Source(s): Ridge Landscape Architects (12-1 7-2025)
Ef'l'lJ Affltw IIEil
40'
R.O.W.

Figure 6-10
Conceptual Landscape Interface - Business Park to Open Space Parkland 6-30
5083

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-1
CHAPTER 7

IMPLEMENTATION PLAN

7.1 Severability
This Specific Plan document enables the City
of Ontario to facilitate the processing and
approval of development plans and
implementing permits to build out the
Eucalyptus Business Park Specific Plan area.

If any regulation, condition, program, or
portion of this Specific Plan is held invalid or
unenforceable, such portions shall be deemed
separate, distinct, and independent
provisions, and the invalidity of such portions
or provisions shall not affect the validity and
enforceability of the remaining provisions
contained herein.

7.2 Applicability
Approval of the Eucalyptus Business Park
Specific Plan indicates acceptance by the City
of Ontario City Council of a general framework
for the development of the Specific Plan area’s
property. Part of that framework establishes
specific development standards that constitute
the zoning regulations of the Specific Plan
(refer to Chapter 5, Development Regulations).

The provisions contained herein are intended
to regulate development within the Specific
Plan area.

Development within the Eucalyptus Business
Park Specific Plan area shall be implemented
through the City’s approval of a tentative map,
a final parcel map, and the Development Plan
Review process as established in the City’s
Development Code. The implementation
process described herein provides the
mechanisms for review and approval of
development projects within the Specific Plan
area.

7.3 Interpretation
Unless otherwise provided, any ambiguity
concerning the content or application of the
Specific Plan shall be resolved by the City’s
Planning Director, or their designee, in a
manner consistent with the goals, policies,
purpose, and intent established in this Specific
Plan.

7.4 Development Review Process

7.4.1 Subdivision Map
Approval of tentative maps within the
Eucalyptus Business Park Specific Plan area
may occur concurrently with or subsequently
to the adoption of the Specific Plan. The
tentative map and final subdivision maps shall
be reviewed and approved pursuant to the
applicable provisions of the City’s Subdivision
Ordinance and consistent with the applicable
provisions established within the Land Use,
Infrastructure, Design Guidelines, and
Development Regulations chapters of this
Specific Plan.

7.4.2 Development Plan Review
All development within the Eucalyptus
Business Park Specific Plan area shall be
subject to the Development Plan Review
Process established in the City of Ontario
Development Code, or as approved the by
Planning Director or their designee). Adoption
of this Specific Plan by the City includes the
design guidelines contained in Chapter 6,
5084

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-2
which shall be the design criteria by which
development projects within the Specific Plan
area shall be reviewed during Development
Plan Review. Additionally, proposed uses
within the Specific Plan area shall not exceed
the total number of daily vehicle trips studied
within the EIR prepared to address the
Eucalyptus Business Park Specific Plan.

For topics on which these design guidelines
are silent, the applicable design guidelines
contained within the City’s Development Code
shall apply. The design guidelines are intended
to offer flexibility while establishing
fundamental evaluation criteria to guide the
City’s review of development projects during
the design review process.

7.4.3 Development Agreements
Pursuant to California Government Code
Sections 65864 et seq., City approval of
individual statutory Development Agreements
with each property owner may be included as
part of the Specific Plan approval process and
must be secured prior to approval of the first
Final Map. The Development Agreement shall
include, but not be limited to, methods of
financing, acquisition, and construction of
infrastructure. The Eucalyptus Business Park
Specific Plan Development Agreement shall be
fully executed prior to the issuance of the first
building permits for development or first public
works permit, whichever takes place first,
within the Specific Plan.

7.4.4 Conditional Use Permits
Uses identified as conditionally permitted
within Chapter 5, Development Regulations, of
this Specific Plan shall be subject to review and
approval by the City pursuant to the
procedures set forth in Division 4.02.015,
Conditional Use Permits, of the City’s
Development Code.

7.4.5 Variances
Variances and Administrative Exceptions to
the development regulations contained in
Chapter 5, Development Regulations, of this
Specific Plan with respect to the site area,
setback dimensions, building heights,
distances between buildings, landscape
percentage and off-street parking and loading
shall be reviewed pursuant to “Variances and
Administrative Exceptions” of Section

4.02.020 of the City’s Development Code.

7.5 Substantial Conformance
The Substantial Conformance Determination is
a mechanism that allows for the approval of
ministerial minor modifications for
development under the Specific Plan, which is
considered and approved ministerially by the
Planning Director or their designee. The City
recognizes that modifications to the text and
exhibits of this Specific Plan document may be
needed over time. Upon direction by the City
of Ontario Planning Department, certain
modifications to text, exhibits, and/or
development standards and design guidelines
may not require a formal Specific Plan
Amendment (i.e., through public hearing) and
can occur ministerially. The following minor
modifications to this document do not require
a formal Specific Plan Amendment and are
subject to ministerial review and approval by
the Planning Director or their designee. The
Planning Director shall have the discretion to
approve or defer any request for modification
to the Planning Commission or City Council,
either for ministerial direction and guidance, or
for a determination that the required change
requires a formal amendment as discussed
below in Section 7.6. Ministerial Substantial
Conformance decisions are not subject to
CEQA compliance because CEQA applies to
discretionary actions and not to ministerial
actions.
5085

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-3
A Substantial Conformance shall constitute
the following and will require approval from the
Planning Director or their designee:
• Expansions or reductions of the net
acreage covered by a given Planning Area.
• Transfer of development square footage of
15% or less within the same land use
designation, provided that the shift in
square footage does not exceed the
maximum allowable square footage of
2,939,000 s.f. or exceed the maximum
FAR of 0.55 provided in Chapter 5 of this
Specific Plan.
• The ultimate alignment of driveways and
drive aisles within any Planning Area as
part of the development of implementing
project(s).
• Construction of buildings, landscaping,
and/or parking areas for building sites may
cross over into adjacent Planning Areas
within the same land use designation,
Buildings constructed across Planning
Area boundaries shall not, by themselves,
trigger the requirement for a Substantial
Conformance. Modification of design
criteria such as architectural details,
landscape treatments, fencing, lighting,
and signage.
• Changes to the Phasing Plan, provided
infrastructure is available to serve the
phase as determined by the City Engineer.
• Implementation of alternative landscape
materials, wall materials, entry monument
design, primary/secondary corner
treatments, and streetscape design that
are generally consistent with the
conceptual design guidelines contained
within this Specific Plan.
• Modifications to the Business Park
Architectural Design Guidelines, such as
variation of architectural style and
variations in materials and colors.
• The Conceptual Site Plan exhibit (Figure 3-
3) is illustrative only; modifications to the
building orientation and layout as part of
the Development Plan review process
where the revisions remain consistent with
the intent and development standards of
the Specific Plan. Final infrastructure
facility sizing and precise location of dry
utilities, water, sewer, and storm drainage
improvements as approved by the City
Engineer, OMUC, or San Bernardino Flood
Control District.
• Roadway ROW design, when the changes
are warranted and approved by the City
Engineer.
• Revisions to exhibits that do not
substantially change the intent of the
Specific Plan.
• Modification, deletions, and additions to
the list of permitted and conditionally
permitted uses.
• Specific modifications of a similar nature to
those listed above which are deemed
minor by the Planning Director, which are
in keeping with the intent of this Specific
Plan and which are in conformance with
the Policy Plan component of The Ontario
Plan.

7.6 Formal Amendments to the
Specific Plan
All modifications to this Specific Plan
document that do not meet the criteria of a
Substantial Conformance (as defined in the
previous subsection) shall be deemed to
require a formal Specific Plan Amendment.

Formal Specific Plan Amendments shall be
subject to the review and approval of the City
Council. The Planning Commission should first
hear and consider all applications for formal
Specific Plan Amendments and provide a
recommendation to the City Council. As
required by the California Government Code,
all government agencies significantly affected
by the proposed Amendment shall be notified
5086

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-4
of the proposed action prior to the approval.

Because a Specific Plan Amendment is a
discretionary action, such amendments shall
be appropriately reviewed in accordance with
the CEQA Statute and Guidelines, with the City
of Ontario serving as the CEQA Lead Agency.

Any formal Specific Plan Amendment initiated
by an applicant requires preliminary review by
the Planning Director, filing of an official
application and required materials supporting
the Amendment, submittal of a fee.

In considering approval or disapproval of
formal Specific Plan Amendments, the
Planning Commission and City Council shall
find that the request is:
• Consistent with the Policy Plan component
of The Ontario Plan (General Plan) in effect
at the time of consideration.
• Compatible with surrounding land uses
with respect to use, development
standards, density, or issues of health,
public safety, and general welfare.
• Consistent with the overall design
character and general structure set forth in
Chapter 6, Design Guidelines, of this
Specific Plan.

7.7 Appeals
Appeals of any determination of the Planning
Director, Zoning Administrator, or the Planning
Commission, may be made by the applicant or
any other aggrieved party by filing an
application on forms provided by the City of
Ontario and accompanied by the appropriate
filing fee, where applicable, within ten (10)
days following the final date of action for which
an appeal is made.

7.8 Compliance with Mitigation
Monitoring and Reporting Program
Certification of an EIR shall be required prior to
the approval of the Specific Plan. Development
within the Eucalyptus Business Park Specific
Plan shall comply with all approved mitigation
measures as described in the MMRP included
as part of the EIR.

7.9 Project Financing
The financing of construction, operation, and
maintenance of public improvements, facilities,
and public services shall include funding
through a combination of financing
mechanisms. Prior to the recordation of final
maps, a final determination shall be made by
City staff and confirmed by the Planning
Director and City Engineer regarding the
responsibility for construction and
maintenance of public facilities, whether
publicly or privately maintained.

Implementation of the Eucalyptus Business
Park Specific Plan may involve financing
options including, but not limited to, the
following sections:

7.9.1 Facilities and Services
Construction of public improvements and
facilities and the provision of public services
may be financed through private capital
investment, a Community Facilities District
(CFD), Development Impact Fees (DIF), or
other special district, pursuant to the MelloRoos Community District Act of 1982.

7.9.2 Operation and Maintenance
Options for operation and maintenance of
public and private improvements and facilities
include, but are not limited to, the following:
• City Public Works Department or other
public agencies
• Individual private property owners
5087

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-5
• Private Property Owners Association
• CFD or other special district (will be at the
City’s sole distraction)

7.10 Phasing Plan
As shown on Figure 7-1, Conceptual Phasing
Plan, the development of the Eucalyptus
Business Park Specific Plan area is expected
to occur in six phases in response to market
demands and according to a logical and
orderly extension of roadways, public utilities,
and infrastructure.

Phase A includes Planning Areas 3 and 6;
Phase B includes Planning Areas 2 and 5;
Phase C includes Planning Areas 1 and 4;
Phase D includes Planning Area 9; Phase E
includes Planning Area 8; and Phase F
includes Planning Area 7. The developer and
the City of Ontario will work together to ensure
that the Open Space – Parkland Planning
Areas are constructed concurrently with the
build-out of the Business Park portions of the
Specific Plan area in a phased manner. The
details of this partnership will be included in the
Development Agreement(s) accompanying
the approval of the Specific Plan.

Phasing of the Specific Plan shall be permitted;
however, required public improvements will be
dictated by the City of Ontario’s Land
Development Section and the approved
Development Agreement(s). The Phasing Plan
is conceptual and subject to revision as the
project development evolves. The Specific
Plan shall allow development in any phase at
any time if adequate infrastructure to support
same is included. For example, construction of
the publicly operated animal resource center
or other building or improvement may occur
prior to the completion of an earlier phase.

7.11 Maintenance Plan
The public and private improvements
constructed within the Eucalyptus Business
Park Specific Plan area shall be maintained
through a combination of public and private
entities as described in Table 7-1,
Maintenance Responsibilities. Table 7-1
provides a list of maintenance entity options
that may fund and/or maintain facilities within
the Specific Plan area, however, the ultimate
maintenance entity for each facility will be
determined by the Eucalyptus Business Park
Specific Plan’s Development Agreement(s). A
Property Owners Association (POA) may be
established for the maintenance of common
area landscape improvements and private
roadways within portions of the Eucalyptus
Business Park Specific Plan area. For areas in
public ownership (such as public roadway
ROWs and the Open Space-Parkland Planning
Areas), City of Ontario Public Works, other
public agencies, or municipal maintenance
districts may fund the maintenance of these
areas.
5088

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-6
Table 7-1 Maintenance Responsibilities
Facility City and/or CFD
Property Owners
Association
Property Owner
or Occupant
Public Utility
Public rights-of-way (ROW)
(Campus Avenue, Bon View
Avenue, Grove Avenue, Walker
Avenue, Eucalyptus Avenue, New
Public Street)
• Curb-to-curb improvements X
• Parkways within public right-ofway (ROW) X
• Neighborhood Edges, Master
Plan Trails and Medians X X
• Landscape buffer located
outside public ROW - private X X
Interior private streets located
outside of the public ROW
(including parkways, landscaping,
non-Master Plan Trails, and
sidewalks)
X
Off-street parking areas - private X X
Traffic signals X
Traffic control signs – in the public
ROW X
Traffic control signs – not in the
public ROW X X
Street lights – in the public ROW X
Street lights – not in the public

ROW X X
Public water, sewer, and storm
drain improvements within public
ROW
X
On-site landscaping and irrigation
- private X X
Common open space – private X
Walls and fences - private X X
Corner and Entry Monuments -
private X X
Tenant Signage – private X X
Off-street lighting – private X X
Storm Water Drainage/Water
Quality Facilities – within the curbto-curb area of a public streetX Permanent Storm Water
Drainage/Water Quality Facilities
(swales, basins, biotreatment
X X
5089

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
7-7
Facility City and/or CFD
Property Owners
Association
Property Owner
or Occupant
Public Utility
filters, etc.) – behind the curb line
of the public street
Dry Utilities (electricity, natural
gas, communications systems) X
Fiber Optic communication system
in the public ROW (OntarioNet
fiber lines)
X X
Open Space – Parkland X
Publicly Operated Animal
Resource Center X

5090

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
HASE F
- ------- -- PA 7
OPEN SPACE OF - 1 •~• ;======~ OPEN SPACE
R nn AC n ee .;;;::::::•::~::RQ:::Ar::::::========
PA 1

BUS ESSPARY

7.70 AC.

PHASE C
PA4

BUSINESS PARK

18.1 9AC.
~ ,0:
s:
,!! g
PA2 RIJC .. cc D
PHASE
Ill

37.76AC.
~
B <(
~
~ (!)
PA3

BUSINESS PARK

18.21 AC.

PHASE A
PA6

BUSINESS PARK

17.71 AC.

I
I
'-- ---- - ---------------- EUCALYPTUSAVE --- -------~ - - ______________ __/ Specific Plan Area
Phase A
Phase B
Phase C
Source(s): Esri, Nearmap Imagery (January 2025). Michael Baker (11-20-2025), San Bernardino County (2025) ~ 0 200 400 800
m-..-Feet
Phase D
Phase E
Figure 7-1
Phasing Plan
7-8
5091

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-1

APPENDIX A

POLICY PLAN CONSISTENCY ANALYSIS
California Government Code (Title 7, Division 1, Chapter 3, Article 8, §§ 65450 through 65457) allows local governments to adopt and administer specific plans as tools to implement their general plan; however, specific plans must demonstrate consistency with the goals and policies set forth in the local general plan. This appendix provides a summary discussion to demonstrate that this Eucalyptus Business Park Specific Plan is consistent with, and results in the implementation of, applicable primary goals and policies of the Policy Plan (General Plan) component of The Ontario Plan.

The Ontario Plan Policy Specific Plan Consistency
Land Use Element
LU-1: A community that has jobs in the City and that make it possible for people to live and work in Ontario and maintain a quality of life.

LU-1.1: Strategic Growth.

We concentrate growth in strategic
locations that help create place and
identity, maximize available and planned
infrastructure, foster the development of
transit, and support the expansion of the
active and multimodal transportation
networks throughout the City.

Consistent. The Eucalyptus Business Park Specific
Plan area is located in the Ontario Ranch area of the
City, which is an area planned for future growth. The
City’s Master Plans for water, sewer, and storm
drainage identify planned infrastructure facilities to
support growth in this area. The developer(s) of the
Eucalyptus Business Park Specific Plan area will be
required to participate in the installation of the Master Plan infrastructure. Additionally, streets within the
Specific Plan area are designed to be safe and
accessible to accommodate different modes of nonvehicular transportation.

LU-1.2: Sustainable Community Strategy.

We integrate state, regional, and local
Sustainable Community /Smart Growth
principles into the development and
entitlement process.

Consistent. The Eucalyptus Specific Plan features
numerous sustainable features. The Specific Plan
encourages non-motorized circulation by employees
and visitors via its provision of an integrated network of sidewalks, bikeways, and trails. In accordance with
the Policy Plan Exhibit M-02, Multipurpose Trails &
Bikeway, Class II bike lanes are provided along both
sides of Campus Avenue and Walker Avenue.

Additionally, the Eucalyptus Business Park Specific
Plan area includes an 8-foot multi-purpose trail along
Eucalyptus Avenue, Grove Avenue and Walker
Avenue.

All development in the Specific Plan area are required
to conform to the California Green Building Standards
Code (CalGreen Code) and the Specific Plan includes
5092

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-2
The Ontario Plan Policy Specific Plan Consistency
Land Use Element
Energy Efficiency guidelines. In addition, the EBPSP
includes a rooftop solar energy system which would
generate enough electricity to meet 45% of annual
electricity demand. The plant palette for the Specific
Plan area consists of water-efficient species native to southern California or naturalized to the arid southern California climate, and the use of turf will be
minimized. As such, the Eucalyptus Specific Plan is
consistent with this policy.

LU-1.3: Adequate Capacity.

We require adequate infrastructure and
services for all development.

Consistent. The developer(s) of the Eucalyptus
Business Park Specific Plan area are required to install adequate roadway and utility infrastructure
improvements to meet the demands of the Specific
Plan while maintaining adequate service levels for
existing, surrounding development. Refer to the
Environmental Impact Report (EIR) prepared for the
Eucalyptus Business Park Specific Plan for a detailed
analysis of the adequacy of the Specific Plan’s
infrastructure improvements.

LU-1.4: Multimodal Mobility.

We require development and urban
design, where appropriate, that reduces
reliance on the automobile and capitalizes
on active transportation, transit, electric
vehicles, and multimodal transportation
opportunities
Consistent. The Eucalyptus Business Park Specific
Plan area offers numerous opportunities for nonvehicular circulation, including multi-purpose trails, bikeways, and sidewalks. Class II bike lanes would
largely be provided along both sides of Campus
Avenue, between Riverside Drive and Holt Avenue,
Eucalyptus Avenue, and Walker Avenue, between
Euclid Avenue and Hamner Avenue. Additionally, the
Eucalyptus Business Park Specific Plan area includes
an 8-foot multi-purpose trail along Eucalyptus Avenue,
Grove Avenue, Campus Avenue, and Walker Avenue
to encourage connectivity and circulation by
employees, visitors, and the passersby that is not
completely dependent on a motorized vehicle.

Additionally, bike storage facilities are required to be installed in each building to further promote alternative transportation.

LU-1.5: Jobs-Housing Balance.

We coordinate land use, infrastructure,
and transportation planning and analysis
with regional, county, and other local
agencies to further regional and
subregional goals for jobs-housing
balance.

Consistent. The developer(s) of the Eucalyptus
Business Park will construct roadway and utility
improvements in accordance with the City’s
infrastructure master plans. Furthermore, the Specific
Plan area will generate employment opportunities for
residents of the City and surrounding jurisdictions,
and reduce the need for residents in the region to
commute to other regions for employment
opportunities. Accordingly, implementation of the
Eucalyptus Business Park Specific Plan will improve
5093

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-3
The Ontario Plan Policy Specific Plan Consistency
Land Use Element
the jobs-housing balance within the City and the
Inland Empire region.

LU-1.6: Complete Community.

We incorporate a variety of land uses and
building types in our land use planning
efforts that result in a complete community
where residents at all stages of life,
employers, workers, and visitors have a
wide spectrum of choices of where they
can live, work, shop and recreate within
Ontario.

Consistent. The Eucalyptus Business Park Specific
Plan land use plan provides Business Park land uses
that will accommodate a variety of employment uses
arranged in a sensible and efficient manner that allow
ease of access and complement the surrounding
community. The parkland area will provide
recreational amenities for residents of and visitors to the City of Ontario. The business park area of the
Eucalyptus Business Park Specific Plan area is
envisioned to attract local, national, and international businesses, and will assist in diversifying the mix of
employment opportunities available in the City. The
retail component within the business park area will
serve both the businesses within the Eucalyptus
Business Park Specific Plan area and the broader
community.

LU-1.7: Revenues and Costs.

We require future amendments to our
Land Use Plan to be accompanied by
analyses of fiscal impacts.

Consistent. A fiscal impact analysis will be prepared in support of the Specific Plan. Refer to the Eucalyptus
Business Park Specific Plan EIR for a detailed analysis of potential fiscal effects associated with the
implementation of the Specific Plan.

LU-2: Compatibility between a wide range of uses and resultant urban patterns and forms.

LU-2.1: Land Use Decisions.

We minimize adverse impacts on adjacent
properties when considering land use and
zoning requests.

Consistent. The Eucalyptus Business Park Specific
Plan EIR evaluated the potential physical
environmental impacts of the implementation of the
Specific Plan on the surrounding community in
accordance with the California Environmental Quality
Act (CEQA). Refer to the Eucalyptus Business Park
Specific Plan EIR for a detailed analysis of impacts to adjacent properties associated with the
implementation of the Specific Plan.

LU-2.2: Buffers.

We require new uses to provide mitigation
or buffers between existing uses where
potential adverse impacts could occur.

Additional mitigation is required when new
uses could negatively impact
environmental justice areas.

Consistent. The Eucalyptus Business Park Specific
Plan provides conceptual streetscapes for Eucalyptus
Avenue, Campus Avenue, Walker Avenue, and Public
Street ‘A’; primary and secondary corner treatments
at Specific Plan entry points; and landscaped
screening walls between truck courts and parking
areas and adjacent public rights-of-way.

Implementation of these features provides a visual
buffer between planned on-site Business Park land
uses and existing and planned off-site land uses.

Additionally, the Specific Plan includes Open Space–
Parkland along the northern boundary to separate the
business park uses from the residential uses planned
5094

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-4
The Ontario Plan Policy Specific Plan Consistency
Land Use Element
to the north. As such, the Eucalyptus Business Park is
consistent with this policy.

LU-2.3: Hazardous Uses.

We regulate the development of industrial
and similar uses that use, store, produce,
or transport toxic substances, air
emissions, other pollutants, or hazardous
materials.

Consistent. Building occupants within the Eucalyptus
Business Park Specific Plan area are obligated to
comply with all local and State requirements for using, storing, producing, or transporting toxic substances,
air emissions, other pollutants, or hazardous
materials.

LU-2.5: Regulation of Uses.

We regulate the location, concentration,
and operation of uses that have impacts
on surrounding land uses.

Consistent. The Eucalyptus Business Park Specific
Plan EIR evaluated the potential physical
environmental impacts of the implementation of the
Specific Plan on the surrounding community in
accordance with CEQA. Refer to the Eucalyptus
Business Park Specific Plan EIR for a detailed analysis of impacts to adjacent properties associated with the
implementation of the Specific Plan.

LU-2.6: Infrastructure Compatibility.

We require infrastructure to be
aesthetically pleasing and in context with
the community character.

Consistent. Water, sewer, storm drain, and dry utility
improvements will be located underground and out of
view, with the exception of storm water inlets and
channels that are required to be exposed at the
surface. Roadway infrastructure improvements are
designed to be landscaped with a combination of
evergreen and deciduous trees – including flowering
varieties – shrubs and groundcovers in an
aesthetically-pleasing manner to establish the
Specific Plan’s design theme.

LU-2.8: Transitional Areas.

We require development in transitional
areas to protect the quality of life of current
residents.

Consistent. The Eucalyptus Business Park Specific
Plan area is primarily surrounded by agricultural uses, dairy operations, and existing and planned industrial
warehouse uses. Nonetheless, the Specific Plan
stipulates landscaping and building setbacks along all
of the Specific Plan’s perimeter streets that separate
the Specific Plan area from adjacent properties.

Trucks traveling to and from the Specific Plan area are required to utilize the City’s approved truck routes,
thereby minimizing exposure of nearby residents to
truck-related impacts. Development within the
Specific Plan area must adhere to the Design
Guidelines in Chapter 6 of this Specific Plan, which will provide for a high-quality, attractive, and
contemporary environment.

LU-2.9: Methane Gas Sites.

We require sensitive land uses and new
uses on former dairy farms or other
methane-producing sites be designed to
minimize health risks.

Consistent. If determined to be necessary, the
Eucalyptus Business Park Specific Plan area will be
required to implement the mitigation measures
identified in the Eucalyptus Business Park Specific
Plan EIR addressing soil remediation and building
5095

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-5
The Ontario Plan Policy Specific Plan Consistency
Land Use Element
venting requirements related to methane gas hazards.

As such, this Specific Plan is consistent with this
policy.

LU-4: Development that provides short-term value only when the opportunity to achieve our Vision can be preserved.

LU-4.2: Interim Development.

We allow development in urban, mixed
use, and transit-oriented Place Types that
is not immediately reflective of our ultimate
Vision for the Place Type, provided it can
be modified or replaced when
circumstances are right to support
development aligned with the Place Type
Vision. We will not allow development that
impedes, precludes, or compromises our
ability to achieve our Vision.

Consistent. The central theme of the Ontario Vision is
“A sustained, community-wide prosperity which
continuously adds value and yields benefits.” The
open space-parkland area will introduce and sustain
recreational amenities in the long term for use by City residents and visitors. The phased development of the
business park land uses in the Eucalyptus Business
Park Specific Plan area will attract new businesses,
provide employment opportunities for residents,
contribute the City’s tax base, and construct
circulation and utility infrastructure improvements that are critical to allow for the growth of the region. As
such, the Specific Plan area will help the City achieve its Vision by continuously adding value, yielding
benefits, and contributing to the prosperity of the City and the Inland Empire region.

LU-4.3: Infrastructure Timing.

We require that the necessary
infrastructure and services be in place
prior to or concurrently with development.

Consistent. Chapter 7, Implementation Plan, of the
Eucalyptus Business Park Specific Plan includes a
development phasing plan that requires infrastructure
needed to support the buildout of the Specific Plan to
be adequately phased concurrently with
development.

LU-5: Integrated airport systems and facilities that minimize negative impacts to the community and maximize economic benefits.

LU-5.5: Airport Compatibility Planning for
ONT.

We create and maintain the Airport Land
Use Compatibility Plan for ONT.

Consistent. The land uses provided by the Eucalyptus
Business Park Specific Plan are consistent with the
Airport Land Use Compatibility Plan (ALUCP)
requirements for the Ontario International Airport.

Furthermore, future development on the Specific Plan
property would be required to comply with the
development standards and design guidelines
established in this Specific Plan, as well as the
applicable requirements of the City of Ontario
Development Code, which would preclude any
potential inconsistencies with the Ontario International Airport ALUCP.

LU-5.7: ALUCP Consistency with Land
Use Regulations.

We comply with state law that requires
general plans, specific plans, and all new
development to be consistent with the
Consistent. The land uses provided by the Eucalyptus
Business Park Specific Plan are consistent with the
Airport Land Use Compatibility Plan (ALUCP)
requirements for the Ontario International Airport and
the provisions provided in the Chino Airport Overlay
5096

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-6
The Ontario Plan Policy Specific Plan Consistency
Land Use Element
policies and criteria set forth within an
Airport Land Use Compatibility Plan for
any public-use airport.

District. All proposed development will be reviewed by
the City of Ontario staff in the Development Plan
review process.

LU-5.8: Chino Airport.

We will support the creation and
implementation of the Airport Land Use
Compatibility Plan for Chino Airport.

Consistent. The land uses provided by the Eucalyptus
Business Park Specific Plan are consistent with the
provisions provided in the Chino Airport Overlay
District. Proposed development within the Specific
Plan area will be reviewed by the City of Ontario Staff in the Site Plan review process.

Ontario Plan Policy Specific Plan Consistency
Housing Element
H-1: Stable neighborhoods of quality housing, ample community services and public facilities, wellmaintained infrastructure, and public safety that foster a positive sense of identity.

H-1.4: Historical Preservation.

We support the preservation and
enhancement of residential structures,
properties, street designs, lot
configurations, and other reminders of
Ontario’s past that are considered to be
local historical or cultural resources.

Consistent. Refer to the Eucalyptus Business Park
Specific Plan EIR for a detailed analysis of potential
impacts to historical and cultural resources that would occur as a result of the implementation of the Specific Plan. If determined to be necessary, development
projects within the Specific Plan area will be required to implement mitigation measures to reduce impacts
to historical and cultural resources to the maximum
extent feasible.

Ontario Plan Policy Specific Plan Consistency
Parks and Recreation Element
PR-1: A system of safe and accessible parks that meets the needs of the community.

PR-1.9: Phased Development.

We require parks be built in new
communities before a significant
proportion of residents move in.

Consistent. The Eucalyptus Business Park Specific
Plan does not include the creation of new residential
units, but includes 35.88 acres of the City’s Grand
Park. Chapter 7, Implementation Plan, of the
Eucalyptus Business Park Specific Plan includes a
development phasing plan that discusses the buildout
of the Specific Plan which includes the both the
Business Park and the Open Space – Parkland land
uses.

PR-1.15: Trail Connectivity.

We strengthen and improve equestrian,
bike, and multipurpose trail connections
within the City and work to improve trail
connections into adjacent jurisdictions.

Consistent. The Eucalyptus Business Park Specific
Plan includes multi-purpose trails along Eucalyptus
Avenue, Campus Avenue, Grove Avenue, and Walker
Avenue to encourage connectivity and circulation by
employees, visitors, and the passerby by means not
completely dependent on a motorized vehicle. The
multi-purpose trail system provided by the Specific
Plan area implements the multipurpose trail system
5097

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-7
Ontario Plan Policy Specific Plan Consistency
Parks and Recreation Element
shown in Exhibit M-3, Multipurpose Trails & Bikeway
Corridor Plan, of The Policy Plan.

Ontario Plan Policy Specific Plan Consistency
Environmental Resources Element
ER-1: A reliable and cost-effective system that permits the City to manage its diverse water resources and needs.

ER-1.3: Conservation and Sustainable
Water Supply.

We work with regional water providers and
users to conserve water and ensure
sustainable local water supplies as more
frequent droughts reduce long term local
and regional water availability
Consistent. The Eucalyptus Business Park Specific
Plan incorporates a drought-tolerant plant palette and
water-efficient irrigation system design to minimize the water demands of planned development. In addition,
implementing development projects will be required to
comply with the water-efficiency mandates of the
California Green Building Standards Code, including
the provision of water-efficient fixtures.

ER-1.4: Supply-Demand Balance.

We require that available water supply and
demands be balanced.

Consistent. The Eucalyptus Business Park Specific
Plan EIR evaluates the potential impacts of the
Specific Plan’s implementation related to water supply
based on the results of a project-specific water supply assessment. If deemed necessary by the EIR,
development within the Specific Plan is required to
implement mitigation measures to reduce significant
impacts to the water supply to the maximum extent
feasible.

ER-1.5: Water Resource Management.

Environmental justice areas are prioritized
as we coordinate with local agencies to
protect water quality, prevent pollution,
address existing contamination, and
remediate contaminated surface water
and groundwater.

Consistent. As discussed in the Eucalyptus Business
Park Specific Plan EIR, implementation of the Specific
Plan will not result in new, substantial sources of urban runoff, and also will not violate applicable stormwater quality requirements. Also, the Eucalyptus Business
Park Specific Plan area includes permeable surfaces
(e.g., open space-parkland, landscaped areas, water
quality/infiltration basins) that would allow surface
water to percolate and contribute to recharge of the
aquifer.

ER-1.6: Urban Run-off Quantity.

We encourage the use of low impact
development strategies, including green
infrastructure, to intercept run-off, slow the
discharge rate, increase infiltration, and
ultimately reduce discharge volumes to
traditional storm drain systems.

Consistent. As discussed in the Eucalyptus Business
Park Specific Plan EIR, implementation of the Specific
Plan will not result in new, substantial sources of urban runoff, and also will not violate applicable stormwater quality requirements. Also, the Eucalyptus Business
Park Specific Plan area includes permeable surfaces
(e.g., open space-parkland, landscaped areas, water
quality/infiltration basins) that would allow surface
water to percolate and contribute to recharge of the
aquifer.
5098

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-8
Ontario Plan Policy Specific Plan Consistency
Environmental Resources Element
ER-1.7: Urban Run-off Quality.

We require the control and management
of urban run-off, consistent with Regional
Water Quality Control Board regulations.

Consistent. As discussed in the Eucalyptus Business
Park Specific Plan EIR, implementation of the Specific
Plan will not result in new, substantial sources of urban runoff, and also will not violate applicable stormwater quality requirements. Also, the Eucalyptus Business
Park Specific Plan area includes permeable surfaces
(e.g., open space-parkland landscaped areas, water
quality/infiltration basins) that would allow surface
water to percolate and contribute to recharge of the
aquifer.

ER-1.8: Wastewater Management.

We require the management of
wastewater discharge and collection
consistent with waste discharge
requirements adopted by the Regional
Water Quality Control Board.

Consistent. All sewer conveyance infrastructure
needed to serve the Eucalyptus Business Park
Specific Plan area will be installed in accordance with City design standards. Accordingly, implementation
of the Specific Plan will not violate any applicable
waste discharge requirements as detailed in the
Eucalyptus Business Park Specific Plan EIR.

ER-3: Cost-effective and reliable energy system sustained through a combination of low impact buildings, site and neighborhood energy conservation, and diverse sources of energy generation that collectively helps to minimize the region’s carbon footprint.

ER-3.3: Building and Site Design.

We require new construction to
incorporate energy efficient building and
site design strategies, which could include
appropriate solar orientation, maximum
use of natural daylight, passive solar, and
natural ventilation.

Consistent. The Eucalyptus Business Park Specific
Plan’s design guidelines encourage all new
construction to utilize design features, fixtures,
appliances, and heating and cooling controls to
conserve energy and water. In addition, all
development is required to comply with the California
Green Building Standards Code (CalGreen Code).

ER-3.6: Generation- Renewable Sources.

We promote the use of renewable energy
sources (e.g., solar, wind, biomass) in
public and private sector development.

Consistent. The Eucalyptus Business Park Specific
Plan proposes a rooftop solar energy system which
generates enough electricity to meet 45% of annual
electricity demand.

ER-4: Improved indoor and outdoor air quality and reduced locally generated pollutant emissions.

ER-4.1: Land Use.

We reduce GHG and other local pollutant
emissions through compact, mixed use,
and transit-oriented development and
development that improves the regional
jobs-housing balance.

Consistent. The Eucalyptus Business Park Specific
Plan area provides employment land uses in close
proximity to major transportation corridors (Interstate 10, Interstate 15, State Route 60, State Route 83,
State Route 71 and State Route 91) and near Bus
Rapid Transit (BRT) Corridors along Ontario Ranch
Road and Euclid Avenue. Therefore, the Specific Plan
area provides local employment opportunities for
residents and serves to improve the regional jobshousing balance. Additionally, the Specific Plan area provides an integrated system of sidewalks, bikeways,
and multi-purpose trails on internal and perimeter
roadways to encourage non-vehicular modes of
transportation. The Eucalyptus Business Park
5099

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-9
Ontario Plan Policy Specific Plan Consistency
Environmental Resources Element
Specific Plan area has the potential to reduce vehicle
miles traveled, which would reduce tailpipe emissions
– a major source of greenhouse gases (GHGs).

ER-4.3: Greenhouse Gases (GHG)
Emissions Reductions.

We will reduce GHG emissions in
accordance with regional, state, and
federal regulations.

Consistent. As described in the Eucalyptus Business
Park Specific Plan EIR, the Specific Plan would be
consistent with applicable regional, State, and federal regulations related to the reduction of GHG emissions
and would not obstruct implementation of any GHG
reduction plans/programs.

ER-4.8: Tree Planting.

We protect healthy trees within the City
and plant new trees to increase carbon
sequestration and help the regional/local
air quality. We expand the tree canopy in
environmental justice areas to enhance air
quality and reduce the “heat island” effect.

Consistent. The Specific Plan area is not within an
environmental justice area, however, as part of the
development of the Eucalyptus Business Park Specific
Plan area, a substantial number of trees will be planted within the Specific Plan area, and in particular along
roadway street frontages, near building entrances,
and in passenger car parking lots. In addition, trees
will be planted in the open space-parkland planning
areas.

ER-5: Protected high value habitat and farming and mineral resource extraction activities that are compatible with adjacent development.

ER-5.1: Habitat Conservation Areas.

We support the protection of biological
resources through the establishment,
restoration, and conservation of highquality habitat areas.

Consistent. The Eucalyptus Business Plan Specific
Plan area was historically used for agricultural uses,
dairy farming, and a trucking operation. The Specific
Plan EIR evaluates impacts to biological resources
(including sensitive/protected habitats and species)
as a result of the implementation of the Specific Plan
and establishes mitigation measures required to
reduce significant impacts to the maximum extent
feasible.

ER-5.2: Entitlement and Permitting
Process.

We comply with state and federal
regulations regarding protected species.

Consistent. The Eucalyptus Business Plan Specific
Plan area was historically used for agricultural uses,
dairy farming, and a trucking operation. The Specific
Plan EIR evaluates impacts to biological resources
(including sensitive/protected habitats and species)
as a result of the implementation of the Specific Plan
and establishes mitigation measures required to
reduce significant impacts to the maximum extent
feasible.

ER-5.3: Right to Farm.

We support the right of existing farms to
continue their operations within the
Ontario Ranch.

Consistent. Implementation of the Eucalyptus
Business Park Specific Plan would not preclude the
continued operation of existing farms within the New
Model Colony/Ontario Ranch for ten years, as shown
in Table 5-1, Permitted Uses, of this Specific Plan.

Furthermore, the Eucalyptus Business Park Specific
Plan EIR evaluates impacts to surrounding land uses
that could potentially occur as a result of the
5100

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-10
Ontario Plan Policy Specific Plan Consistency
Environmental Resources Element
implementation of the Eucalyptus Business Park
Specific Plan and establishes mitigation measures
required to reduce significant impacts to the
maximum extent feasible.

ER-5.4: Transition of Farms.

We protect both existing farms and
sensitive uses around them as agricultural
areas transition to urban uses.

Consistent. Implementation of the Eucalyptus
Business Park Specific Plan would not preclude the
continued operation of existing farms within the New
Model Colony/Ontario Ranch for ten years, as shown
in Table 5-1, Permitted Uses, of this Specific Plan.

Furthermore, the Eucalyptus Business Park Specific
Plan EIR evaluates impacts to surrounding land uses
that could potentially occur as a result of the
implementation of the Eucalyptus Business Park
Specific Plan and establishes mitigation measures
required to reduce significant impacts to the
maximum extent feasible.

Ontario Plan Policy Specific Plan Consistency
Community Economics Element
CE-1: A complete community that provides for all incomes and stages of life.

CE-1.1: Jobs-Housing Balance.

We pursue improvement to the Inland
Empire’s balance between jobs and
housing by promoting job growth that
reduces the regional economy’s reliance
on out-commuting.

Consistent. The Eucalyptus Business Park Specific
Plan would provide over 137.90 acres of new
employment-generating land uses in close driving
distance to existing and planned residential land uses.

The new job opportunities provided within the Specific
Plan area will assist the City’s efforts to promote job growth and improve the balance between jobs and
housing within the City limits.

CE-1.12: Circulation.

We continuously plan and improve public
transit and non-vehicular circulation for
the mobility of all, including those with
limited or no access to private
automobiles.

Consistent. BRT Corridors are located along Ontario
Ranch Road and Euclid Avenue in close proximity to
the Specific Plan. The Specific Plan would construct a
bus turnout near the intersection of Grove Avenue and
Eucalyptus Avenue in anticipation of future Omnitrans
service. Additionally, the Specific Plan area provides
Class II Bikeways along Walker Avenue and Campus
Avenue. Additionally, sidewalks are provided along all
streets within the Specific Plan area.

CE-2: A City of distinctive neighborhoods, districts, corridors, and centers where people choose to be.

CE-2.1: Development Projects.

We require new development and
redevelopment to create unique, highquality places that add value to the community.

Consistent. The Eucalyptus Business Park Specific
Plan provides for the development of the Specific Plan
property as a high-quality and contemporary business
park. This Specific Plan’s Design Guidelines establish
criteria for architecture, lighting, signage, and
landscape design to promote the development of an
5101

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-11
Ontario Plan Policy Specific Plan Consistency
Community Economics Element
attractive business park with timeless design features, for as an inviting place to work and conduct business.

The adjacency of the park and integral retail
development further enhances the attractiveness of
the Specific Plan.

CE-2.2: Development Review.

We require those proposing new
development and redevelopment to
demonstrate how their projects will create
appropriately unique, functional, and
sustainable places that will compete well
with their competition within the region.

Consistent. The Eucalyptus Business Park Specific
Plan requires implementing development projects
within the Specific Plan area to be reviewed and
approved pursuant to the provisions of the City’s
Subdivision Ordinance and Development Plan Review
process which provides for review by the City’s
Planning Department which may require the
development to demonstrate how each project will
create appropriately unique, functional and
sustainable places. Furthermore, development
projects in the Specific Plan area are required to be
designed in accordance with the architectural and
landscape design guidelines established in Chapter 6,
Design Guidelines, of this Specific Plan, which will
result in a unique, aesthetically attractive, and
contemporary business park that will be highly
competitive with similar developments in the region.

CE-2.4: Protection of Investment.

We require that new development and
redevelopment protect existing
investment by providing architecture and
urban design of equal or greater quality.

Consistent. Development projects in the Eucalyptus
Business Park Specific Plan are required to be
designed in accordance with the architectural and
landscape design guidelines in Chapter 6, Design
Guidelines, of this Specific Plan, which will result in a unique, aesthetically attractive, and contemporary
business park that reflects high-quality architectural
design.

CE-2.5: Private Maintenance.

We require adequate maintenance,
upkeep, and investment in private
property because proper maintenance on
private property protects property values.

Consistent. This Specific Plan defines the entities
responsible for the maintenance of publicly and
privately-owned improvements within the Specific
Plan area, including roadways and utility
infrastructure. Compliance with the maintenance
responsibility matrix established in Chapter 7,
Implementation Plan, will ensure that all improvements
within the Specific Plan area are properly and
consistently maintained.

CE-2.6: Public Maintenance.

We require the establishment and
operation of maintenance districts or other
vehicles to fund the long-term operation
and maintenance of the public realm
whether on private land, in rights-of-way,
or on publicly-owned property.

Consistent. This Specific Plan defines the entities
responsible for the maintenance of publicly and
privately-owned improvements within the Specific
Plan area, including roadways and utility
infrastructure. Compliance with the maintenance
responsibility matrix established in Chapter 7,
Implementation Plan, will ensure that all improvements
5102

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-12
Ontario Plan Policy Specific Plan Consistency
Community Economics Element
within the Specific Plan area are properly and
consistently maintained.

CE-3: Decision-making deliberations that incorporate the full short-term and long-term economic and fiscal implications of proposed City Council actions.

CE-3.2: General Plan Amendments.

We require those proposing General Plan
amendments to disclose reasonably
foreseeable impacts through a fiscal
analysis.

Consistent. A fiscal impact analysis will be prepared in support of the Eucalyptus Business Park Specific
Plan. Refer to the Eucalyptus Business Park Specific
Plan EIR for a detailed analysis of potential reasonably foreseeable fiscal effects associated with
implementation of this Specific Plan.

Ontario Plan Policy Specific Plan Consistency
Mobility Element
M-1: A system of roadways that meets the mobility needs of a dynamic and prosperous Ontario.

Policy M1-1: Roadway Design and
Maintenance.

We require our roadways to:
• Comply with federal, state, and
local design and safety
standards;
• Meet the needs of multiple
transportation modes and
users;
• Handle the capacity envisioned
in the City of Ontario Master
Plan of Streets and Highways;
• Be maintained in accordance
with best practices;
• Be compatible with the
streetscape and surrounding
land uses; and
Promote the efficient flow of all modes of
traffic through the implementation of
intelligent transportation systems and
travel demand management strategies.

Consistent. The Eucalyptus Business Park Specific
Plan includes roadway improvements consistent with
the City of Ontario Master Plan of Streets and
Highways, as described in Chapter 4, Infrastructure
Plan. Perimeter and internal streets will be
constructed to City standards and are designed to
accommodate vehicles, pedestrians, and bicyclists
through the inclusion of sidewalks, Class II bike lanes, and multi-purpose trails. Roadway designs include
parkways and landscaping to support circulation and
enhance compatibility with adjacent land uses.

Maintenance responsibilities are outlined in Chapter
7, Implementation Plan.

Policy M1-2: Mitigation of Impacts.

We require development to mitigate its
traffic impacts.

Consistent. The Eucalyptus Business Park Specific
Plan is supported by a project-specific traffic impact
analysis that identifies necessary mitigation measures
to address traffic impacts. The implementation of
these measures will be the responsibility of the
developer(s) and will be carried out in accordance
with City of Ontario standards and requirements.

Policy M1-4: Complete Streets. Consistent. The Eucalyptus Business Park Specific Plan establishes a multimodal circulation network that
5103

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-13
Ontario Plan Policy Specific Plan Consistency
Mobility Element
We work to provide a complete, balanced,
context-aware, multimodal transportation
network that meets the needs of all users
of streets, roads, and highways, including
motorists, pedestrians, bicyclists,
children, persons with disabilities, seniors,
movers of commercial goods, and users of
public transportation. We prioritize
implementation of complete streets
improvements in environmental justice
areas to facilitate opportunities for
residents to use active transportation
systems.
includes sidewalks, Class II bike lanes, and multipurpose trails along major roadways such as Campus Avenue, Eucalyptus Avenue, and Walker Avenue, as
described in Chapter 4, Infrastructure Plan. The plan
is designed to accommodate pedestrians, bicyclists,
and vehicles through coordinated roadway and nonvehicular improvements. Design Guidelines in Chapter 6 address pedestrian connectivity and
require consistent treatment of sidewalks, parkways,
and landscape buffers to support safe and functional
circulation throughout the Specific Plan area.

Policy M1-5: Level of Service.

Maintain a peak hour Level of Service
(LOS) E or better at all intersections.

Maintain Level of Service D or better on
arterial streets in the City. Develop and
maintain a list of locations where LOS E or
LOS F are considered acceptable and
would be exempt from this level of service
policy. Considerations for LOS exemption
include being restricted by environmental
constraints, lacking available right-of-way,
deterring an increase in VMT, or
degrading other modes of travel (such as
bicycle or pedestrian infrastructure).

Consistent. The Eucalyptus Business Park Specific
Plan is supported by a project-specific traffic impact
analysis that identifies necessary mitigation measures
to address traffic impacts, as referenced in Chapter 4, Infrastructure Plan. The Specific Plan includes
planned improvements to perimeter and internal
roadways in accordance with the City of Ontario
Master Plan of Streets and Highways. Intersection
improvements and roadway design will be subject to
further analysis and review by the City to ensure
compliance with applicable standards.

Policy M1-6: Reduced Vehicle Miles
Traveled.

We will strive to reduce VMT through a
combination of land use, transportation
projects, travel demand management
strategies, and other trip reduction
measures in coordination with
development projects and public capital
improvement projects.

Consistent. The Eucalyptus Business Park Specific
Plan allows for business park and support commercial
land uses with internal circulation systems, including
sidewalks, bike lanes, and multi-purpose trails, to
encourage non-vehicular travel. Also, the open
space-parkland planning areas will provide
recreational amenities and the retail component within
the business park planning area will provide support
services within walking and biking distance of the
business park uses.

M-2: A system of trails and corridors that facilitate and encourage active modes of transportation.

Policy M2-1: Active Transportation.

We maintain our Active Transportation
Master Plan to create a comprehensive
system of on- and off-street bikeways and
pedestrian facilities that are safe,
comfortable, and accessible and connect
residential areas, businesses, schools,
parks, and other key destination points.

Consistent. The Eucalyptus Business Park Specific
Plan includes the construction of Class II bike lanes
along Campus Avenue, Eucalyptus Avenue, and
Walker Avenue, as well as multi-purpose trails along
Campus Avenue, Eucalyptus Avenue, Grove Avenue,
and Walker Avenue, as detailed in Chapter 4,
Infrastructure Plan. These facilities are integrated with a network of sidewalks throughout the Specific Plan
5104

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-14
Ontario Plan Policy Specific Plan Consistency
Mobility Element
area to support safe and accessible travel for
pedestrians and bicyclists. The circulation
improvements are designed to enhance connectivity
within the Business Park and to adjacent areas,
consistent with the City’s active transportation goals.

Policy M2-2: Bicycle System.

We provide off-street multipurpose trails
and Class II bikeways as our primary paths
of travel and use the Class III for
connectivity in constrained
circumstances. When truck routes and
bicycle facilities share a right-of-way, we
prefer Class I or Class IV bicycle facilities.

We require new development to include
bicycle facilities, such as bicycle parking
and secure storage areas.

Consistent. The Eucalyptus Business Park Specific
Plan includes Class II bikeways and multi-purpose
trails throughout the circulation network to support
bicycle travel. At final buildout, all development in the Specific Plan area will be required to comply with City of Ontario bicycle facility standards, including
provisions for bike lanes, trails, and secure bicycle
parking and storage.

Policy M2-3: Pedestrian Walkways.

We require walkways that promote safe
and convenient travel between residential
areas, businesses, schools, parks,
recreation areas, and other key
destination points.

Consistent. The Eucalyptus Business Park Specific
Plan includes sidewalks and multi-purpose trails along
all major perimeter roadways, including Eucalyptus
Avenue, Grove Avenue, Walker Avenue, and Campus
Avenue, to ensure safe and convenient pedestrian
access throughout the plan area. Internal private drive aisles and public streets will provide additional
pedestrian connections between planned business
park uses and open space areas. All pedestrian
facilities will be constructed in accordance with City
standards and designed to promote visibility and
safety.

M-2.4 Network Opportunities.

We use public rights-of-way and
easements such as, utility easements,
levees, drainage corridors, road rights-ofway, medians, and other potential options to maintain and expand our bicycle and
pedestrian network. In urban, mixed- use,
and transit-oriented Place Types, we
encourage the use of underutilized public
and private spaces to expand our public
realm and improve pedestrian and bicycle
connectivity. (Link to Community Design
Element Urban, Mixed Use, and Transitoriented Place Types Section) Consistent. The Eucalyptus Business Park Specific
Plan utilizes public rights-of-way to establish a
connected bicycle and pedestrian network, including
sidewalks and multi-purpose trails within the ROWs of
Eucalyptus Avenue, Grove Avenue, Walker Avenue,
Campus Avenue, and other major corridors. The plan
incorporates parkways, landscape buffers, and trail
corridors to expand the public realm and improve nonvehicular connectivity throughout the Specific Plan area in alignment with City goals.

Goal M-4: An efficient flow of goods through the City that maximizes economic benefits and minimizes negative impacts.

Policy M4-1: Truck Routes. Consistent. Truck access to and from the Eucalyptus Business Park Specific Plan area will utilize Grove
5105

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-15
Ontario Plan Policy Specific Plan Consistency
Mobility Element
We designate and maintain a network of
City truck routes that provide for the safe
and efficient transport of goods while
minimizing negative impacts on local
circulation and noise-sensitive land uses,
as shown on Exhibit M-04, Truck Routes.

We will minimize conflicts on truck routes
through the design and implementation of
buffers between travel lanes and
pedestrian and bicycle facilities on
designated truck routes.

Avenue, Walker Avenue, Bon View Avenue, and
Campus Avenue, with connections to designated
truck routes at Eucalyptus Avenue. The circulation
plan includes design elements such as landscape
buffers and trail corridors along key frontages to help minimize potential conflicts between truck traffic and
non-motorized users, consistent with City policies for
safe and efficient goods movement.

Policy M4-4: Environmental
Considerations.

We support both local and regional efforts
to reduce/eliminate the negative
environmental impacts of goods
movement through the planning and
implementation of truck routing and the
development of a plan to evaluate the
future needs of clean fueling/recharging
and electrified truck parking.

Consistent. The Eucalyptus Business Park Specific
Plan supports regional goods movement through
planned improvements to major roadway within
Eucalyptus Avenue, which are identified as truck
routes in Chapter 4, Infrastructure Plan. The Specific
Plan incorporates circulation and site planning
strategies that accommodate truck access and
loading while minimizing conflicts with non-vehicular
travel. These improvements provide a framework that
can support future environmental initiatives related to sustainable goods movement.

Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
CD-1: A dynamic, progressive city containing distinct neighborhoods and commercial districts that foster a positive sense of identity and belonging among residents, visitors, and businesses.

Policy CD1-3: Existing Neighborhoods.

We require the existing character of viable
residential and non-residential
neighborhoods be preserved, protected
and enhanced.

Consistent. The Eucalyptus Business Park Specific
Plan is designed to preserve and protect the character
of surrounding neighborhoods by incorporating a
thoughtful land use plan, site design, and buffer
treatments. Landscape setbacks and open space
parkland are located along perimeter roadways to
provide a visual and physical buffer between Business
Park uses and adjacent properties. Building
orientation, screening walls, and enhanced
landscaping will be used to minimize visual and
operational impacts on neighboring land uses. Design
guidelines in Chapter 6 and development standards in
Chapter 5 ensure that lighting is directed away from
adjacent areas and that loading and service areas are
screened from public view, thereby reducing potential
edge effects and maintaining compatibility with the
surrounding community.
5106

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-16
Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
Policy CD1-4: Transportation Corridors.

We will enhance our major transportation
corridors within the City through
landscape, hardscape, signage and
lighting. The extent of enhancement
should be appropriate to the use, type,
and context of each corridor.

Consistent. The Eucalyptus Business Park Specific
Plan enhances major transportation corridors through
a cohesive streetscape design that includes
landscaping, parkways, and multi-purpose trails along
Eucalyptus Avenue, Grove Avenue, Walker Avenue,
and Campus Avenue. These improvements include a
combination of canopy trees, shrubs, and
groundcover to frame the corridor edges and provide
visual continuity. The plan also provides Class II bike lanes and an internal pedestrian network to promote
safe, multimodal travel. Entry monuments, consistent
signage, and corner treatments are integrated into the
streetscape to reinforce the design character of the
Business Park and create a welcoming environment
for employees and visitors. Design Guidelines in
Chapter 6 further establish architectural and
landscape elements appropriate to the context of
each corridor.

Policy CD1-5: View Corridors.

We require all major north-south streets
be designed and redeveloped to feature
views of the San Gabriel Mountains, which
are part of the City’s visual identity and a
key to geographic orientation. Such views
should be free of visual clutter, including
billboards and may be enhanced by
framing with trees.

Consistent. The Eucalyptus Business Park Specific
Plan does not include any design features that would
obstruct views along major north-south corridors such
as Campus Avenue, Grove Avenue, Bon View
Avenue, and Walker Avenue. As outlined in Chapter 6,
Design Guidelines, and Chapter 4, Infrastructure Plan,
landscaping—including street trees and parkways—
will be installed along these corridors as part of
roadway improvements. These enhancements will be
implemented concurrently with development to create
a cohesive streetscape while maintaining an open
visual character consistent with City policies.

CD-2: A high level of design quality resulting in public spaces, streetscapes, and developments that are attractive, safe, functional and distinct.

Policy CD2-1:

Quality Architecture. We encourage all
development projects to convey visual
interest and character through:
• Building volume, massing, and
height to provide appropriate
scale and proportion;
• A true architectural style which
is carried out in plan, section
and elevation through all
aspects of the building and site
design and appropriate for its
setting; and
Consistent. Future development within the Eucalyptus
Business Park will be guided by the Specific Plan’s
Design Guidelines (Chapter 6), which promote highquality architectural design through appropriate building massing, scale, and articulation. The
guidelines require a unified architectural theme and
consistent application of materials, colors, and
detailing across all visible building elevations. While the Specific Plan does not prescribe specific
materials, it emphasizes the use of durable and
visually appealing finishes appropriate to a modern
business park setting. These standards ensure that
new development contributes positively to the City’s
visual character.
5107

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-17
Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
Exterior building materials that are visually
interesting, high quality, durable, and
appropriate for the architectural style.

Policy CD2-5: Streetscapes.

We design new and, when necessary,
retrofit existing streets to improve
walkability, bicycling and transit
integration, strengthen connectivity, and
enhance community identity through
improvements to the public right of way
such as sidewalks, street trees, parkways,
curbs, street lighting and street furniture.

Consistent. As part of implementation of the
Eucalyptus Business Park Specific Plan,
improvements will be made to existing public streets
including Eucalyptus Avenue, Grove Avenue, Walker
Avenue, Bon View Avenue, and Campus Avenue, as
outlined in Chapter 4, Infrastructure Plan. Planned
improvements include the addition of sidewalks, Class
II bike lanes, and multi-purpose trails to support safe and efficient travel for pedestrians, bicyclists, and
vehicles. Landscaped parkways with trees and other
plantings will be provided along all major roadways to
enhance the visual character of the street network
and reinforce the Specific Plan’s design framework as
described in Chapter 6, Design Guidelines. These
enhancements are intended to improve connectivity
and promote a cohesive streetscape identity
throughout the plan area.

Policy CD2-7: Sustainability.

We collaborate with the development
community to design and build
neighborhoods, streetscapes, sites,
outdoor spaces, landscaping and
buildings to reduce energy demand
through solar orientation, maximum use of
natural daylight, passive solar and natural
ventilation, building form, mechanical and
structural systems, building materials and
construction techniques.

Consistent. The Eucalyptus Business Park Specific
Plan supports sustainable development principles
through its location near regional transportation
corridors and within close driving distance of existing residential neighborhoods. The land use plan
promotes a mix of employment-generating uses
intended to serve both the local and regional
workforce, aligning with smart growth objectives. As
described in Chapter 6, Design Guidelines, the
landscaping strategy emphasizes the use of droughttolerant plant species appropriate for the Inland Southern California climate, with an emphasis on low
water use and long-term maintenance efficiency.

These measures, combined with coordinated site
planning and infrastructure improvements, contribute
to reduced resource demand and enhanced
environmental performance across the Specific Plan
area.

Policy CD2-8: Safe Design.

We incorporate defensible space design
into new and existing developments to
ensure the maximum safe travel and
visibility on pathways, corridors, and open
space and at building entrances and
parking areas by avoiding physically and
visually isolated spaces, maintenance of
Consistent. The Eucalyptus Business Park Specific
Plan serves as the framework for implementing
development projects in the Specific Plan area, and
includes design specifications for sidewalks, building
entrances, and lighting.

5108

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-18
Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
visibility and accessibility, and use of
lighting.

Policy CD2-9: Landscape Design.

We encourage durable landscaping
materials and designs that enhance the
aesthetics of structures, create and define
public and private spaces, and provide
shade and environmental benefits.

Consistent. The landscape concept for the Eucalyptus
Business Park incorporates the use of attractive,
durable landscaping materials, and an irrigation
system designed to keep plant materials in good
health while conserving water. Landscaping will be
provided throughout the Eucalyptus Business Park,
including along roadways, within passenger car
parking lots, at monuments/entries, within common
open space areas, and adjacent to buildings.

Policy CD2-10: Parking Areas.

We require all development, including
single-family residential, to minimize the
visual impact of surface, structured, and
garage parking areas visible from the
public realm in an aesthetically pleasing,
safe and environmentally sensitive
manner. Examples include:

1. Surface parking: Shade trees,
pervious surfaces, urban run-off
capture and infiltration, and
pedestrian paths to guide users
through the parking field.

2. Structured parking: facade
articulation, screening, appropriate
lighting, and landscaping.

3. Garage parking: providing access
to single-family residential garages
through alley access, recessing
garages from the frontage to
emphasize front doors or active
living spaces.

Consistent. The Eucalyptus Business Park Specific
Plan does not include any residential uses. Surface
parking lots, truck courts, and loading areas will be
designed in accordance with the City’s Development
Code and the Specific Plan’s Design Guidelines
(Chapter 6), which require the incorporation of
landscaping, screening, and clearly defined
pedestrian pathways and drive aisles. Additionally,
each building’s surface parking area will be designed
to treat urban runoff through the respective site’s
storm drain design.

Policy CD2-11: Entry Statements.

We encourage the inclusion of amenities,
signage and landscaping at the entry to
neighborhoods, commercial centers,
mixed use areas, industrial developments,
and public places that reinforce them as
uniquely identifiable places.

Consistent. The Eucalyptus Business Park includes
guidelines for building entry treatments, primary and
secondary corner treatments, and tenant monument
treatments to identify the development and distinguish
individual planning areas, in conformance with the
intent of Policy CD2-11. The entry treatments, corner
treatments, and tenant monuments which are
illustrated in Chapter 6, Design Guidelines,
incorporate landscaping and enhanced signage to
provide attractive and distinctive visual statements.

Policy CD2-12: Site and Building Signage. Consistent. The Design Guidelines for the Eucalyptus Business Park (refer to Chapter 6 of this Specific Plan) 5109

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-19
Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
We encourage the use of sign programs
that utilize complementary materials,
colors, and themes. Project signage
should be designed to effectively
communicate and direct users to various
aspects of the development and
complement the character of the
structures.
include signage guidelines to ensure that future
development will construct clear, concise, easy-toread signs that reflect and complement the Specific Plan’s design theme, provide for safe and efficient
circulation of vehicle traffic, and facilitate pedestrian travel. Signs will be of high-quality and the use of
distracting sign elements, such as flashing lights or
moving parts, is prohibited. Additionally, a sign
program will be provided along with the Specific Plan
to further provide design standard for signs within the Specific Plan area.

Goal CD3: Vibrant urban environments that are organized around intense buildings, pedestrian and transit areas, public plazas, and linkages between and within developments that are conveniently located, visually appealing and safe during all hours.

Policy CD3.2: Comfortable, Human-Scale
Public Realm.

We require that public spaces, including
streets, parks, and plazas on both public
and private property be designed to
maximize safety, comfort and aesthetics
and connect to the citywide pedestrian,
vehicular, and bicycle networks.

Consistent. The Eucalyptus Business Park Specific
Plan promotes a comfortable, human-scale public
realm through the coordinated design of its
streetscapes, sidewalks, and multi-purpose trails, as
described in Chapter 4, Infrastructure Plan, and
Chapter 6, Design Guidelines. Sidewalks and trails are
integrated throughout the plan area to enhance
pedestrian and bicycle connectivity, while landscaped
parkways and consistent setbacks create a visually
appealing and walkable environment. These
improvements are designed to provide safe,
accessible, and aesthetically cohesive connections to
the citywide transportation network. Additionally, the
Open Space – Parkland planning areas will provide
both passive and active open space use for visitors,
employees, and surrounding residents of the Specific
Plan area.

Policy CD3.3: Complete and Connected
Network
We require that pedestrian, vehicular, and
bicycle circulation on both public and
private property be coordinated to provide
connections internally and externally to
adjacent neighborhoods and properties
(existing and planned) through a system of
local roads and trails that promote walking
and biking to nearby destinations
(including existing and planned parks,
commercial areas, and transit stops) and
are designed to maximize safety, comfort,
and aesthetics.

Consistent. The Eucalyptus Business Park Specific
Plan provides a coordinated and interconnected
circulation network for vehicles, bicycles, and
pedestrians, as illustrated in Chapter 4, Infrastructure Plan, and Chapter 6, Design Guidelines. Public
roadways and private drive aisles will include
sidewalks, Class II bike lanes, and multi-purpose trails to ensure internal mobility and connectivity to
surrounding areas. Improvements along major
corridors such as Eucalyptus Avenue, Grove Avenue,
Campus Avenue, and Walker Avenue support access
to regional transit and commercial destinations. All
future development will be required to comply with
City standards for sight visibility, safety, and
5110

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-20
Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
landscape placement to ensure a comfortable and
secure travel experience for all users.

Policy CD 3.4: Context-Aware and
Appropriate Design
We require appropriate building and site
design that complements existing
development, respects the intent and
identity of the Place Type, and provides
appropriate transitions and connections
between adjacent uses to ensure
compatibility of scale, maintain an
appropriate level of privacy for each use,
and minimize potential conflicts.

Consistent. The Eucalyptus Business Park Specific
Plan establishes building and site design standards
that ensure compatibility with surrounding
development and land uses, as detailed in Chapters
5, Development Regulations and 6, Design
Guidelines. The plan incorporates landscaped
setbacks, internal circulation buffers, and screening
treatments along perimeter roadways to create
appropriate transitions between the Business Park
and adjacent uses. Building height, massing, and
orientation are designed to respect the scale of
surrounding development and minimize potential land
use conflicts, supporting a context-sensitive and
visually cohesive environment.

Policy CD 3.5: Active Frontages.

We create lively pedestrian streetscapes
by requiring primary building, business,
and residential entrances, outdoor dining,
and storefronts be located on ground
floors adjacent to sidewalks or public
spaces and designed to maximize safety,
comfort, aesthetics, and the intended
functionality (as defined by the Place
Type).

Consistent. While the Eucalyptus Business Park
Specific Plan is focused on employment, business
park, and open space uses rather than retail or
residential development, it incorporates design
elements that support active and engaging frontages
along key pedestrian corridors. As described in
Chapter 6, Design Guidelines, primary building
entrances are oriented toward public streets or
internal circulation routes, with pedestrian
connections provided from sidewalks and trails.

Landscaping, lighting, and pathway design contribute
to a safe and comfortable pedestrian experience,
reinforcing the plan’s intent to create a cohesive and
visually appealing business park environment.

Policy CD 3.6: Managed Infrastructure.

We collaborate with developers and
property owners to facilitate development
that realizes the envisioned character and
functionality of the Place Type through the
use of green and shared infrastructure
within each Place Type.

Consistent. The Eucalyptus Business Park Specific
Plan supports coordinated infrastructure planning to
achieve the intended character and functionality of a
modern business park. As outlined in Chapter 4,
Infrastructure Plan, the project includes shared
infrastructure improvements such as integrated
roadway systems, stormwater facilities, and utility
corridors designed to serve multiple parcels efficiently.

The Specific Plan also promotes sustainable practices
through the use of drought-tolerant landscaping and
multi-purpose trails within public rights-of-way,
contributing to a cohesive, functional, and
environmentally responsible development pattern.

Goal CD-5: A sustained level of maintenance and improvement of properties, buildings and infrastructure that protects the property values and encourages additional public and private investments.
5111

EUCALYPTUS BUSINESS PARK SPECIFIC PLAN
A-21
Ontario Plan Policy Specific Plan Consistency
Community Design Benefit
Policy CD5-1: Maintenance of Buildings
and Property.

We require all public and privately-owned
buildings and property (including trails and
easements) to be properly and
consistently maintained.

Consistent. The Eucalyptus Business Park Specific
Plan defines the responsible parties for maintaining
both public and private improvements, including
roadways, utilities, landscaping, and pedestrian
infrastructure, as outlined in Chapter 7,
Implementation Plan. A maintenance responsibility
matrix is included to ensure long-term upkeep of all
improvements, including trails and easements, in
accordance with City standards. This framework
ensures that all development within the Specific Plan
area will be properly and consistently maintained.

Policy CD5-2: Maintenance of
Infrastructure.

We require the continual maintenance of
infrastructure.

Consistent. The Eucalyptus Business Park Specific
Plan defines the responsible parties for maintaining
both public and private improvements, including
roadways, utilities, landscaping, and pedestrian
infrastructure, as outlined in Chapter 7,
Implementation Plan. A maintenance responsibility
matrix is included to ensure long-term upkeep of all
improvements, including trails and easements, in
accordance with City standards. This framework
ensures that all development within the Specific Plan
area will be properly and consistently maintained.
5112

Page 1 of 2 ends