Cities Index.
Agenda packet

Oroville City Council
July 7, 2026

Document
Agenda packet
Meeting
July 7, 2026
Body
Oroville City Council
Pages
2
Original file
70.9 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 1 of 8

OROVILLE CITY COUNCIL
Council Chambers
1735 Montgomery Street
Oroville, CA. 95965
July 07, 2026

REGULAR MEETING
CLOSED SESSION 3:30 PM
OPEN SESSION 4:30 PM
AGENDA

PUBLIC ACCESS AND PARTICIPATION
Please review the options below for ways to participate or observe the Council Meetings.

To Observe the Meeting:

1. Live Feed: https://www.youtube.com/channel/UCAoRW34swYl85UBfYqT7IbQ/

2. Zoom Link: https://zoom.us/j/96870319529?pwd=dW9kMGRZSFo5MFFNQk5wVDUzRkRrZz09

3. Zoom Application: Meeting ID: 968 7031 9529 Passcode: 67684553

4. By Phone: Telephone: 1-669-900-6833 Meeting ID: 968 7031 9529 Passcode: 67684553 To Provide Comment to the Council:

1. Attend the meeting in person

2. Send an Email by 2:00 PM the day before the meeting to [email protected]. All comments emailed will be provided to the Council Members for their consideration.

If you would like to address the Council at this meeting, you are requested to complete the blue speaker request form (located on the wall by the agendas) and hand it to the City Clerk, who is seated on the right of the Council Chamber. The form assists the Clerk with minute taking and assists the Mayor or presiding chair in conducting an orderly meeting. Providing personal information on the form is voluntary. For scheduled agenda items, please submit the form prior to the conclusion of the staff presentation for that item. Council has established time limitations of three (3) minutes per speaker on all items and an overall time limit of thirty minutes for non-agenda items.

If more than 10 speaker cards are submitted for an item, the time limitation would be reduced to one and a half (1.5) minutes per speaker for that item. If more than 15 speaker cards are submitted for non-agenda items, the first 15 speakers will be randomly selected to speak at the beginning of the meeting, with the remaining speakers given an opportunity at the end. (California Government Code §54954.3(b)).

Pursuant to Government Code Section 54954.2, the Council is prohibited from taking action except for a brief response from the Council or staff to statements or questions relating to a non-agenda item.

CALL TO ORDER / ROLL CALL
Council Members: Chuck Reynolds, Scott Thomson, Tracy Johnstone, Janet Goodson, Shawn Webber, Vice Mayor Eric Smith, Mayor David Pittman
1 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 2 of 8

CLOSED SESSION
The City Council will hold a Closed Session on the following:

1. Pursuant to Government Code Section 54957(b), the Council will meet with the Personnel Officer to discuss Public Employee Performance Evaluations. Position Title: Department Heads and Contract Employees.

2. Pursuant to Government Code section 54957.6, the Council will meet with Labor Negotiators and City Attorney to discuss labor negotiations for the following represented groups: All Units.

3. The City Council will meet for a Conference with Legal Counsel – Anticipated Litigation, pursuant to Gov. Code § 54956.9(d): (two (2) cases).

4. The City Council will meet to confer regarding Real Property Negotiations under Government Code § 54956.8:

1. Property: 225 Chuck Yeager Way, Oroville, CA 95965 Agency Negotiator(s): Brian Ring, City Administrator, David Ritchie, Asst. City Attorney. Negotiating Parties: All current Ground Lease Tenants. Under Negotiation: price, terms of payment.

2. Property: 012-061-001; 012-061-009; 012-061-010; 012-061-018 Negotiator(s): Brian Ring, City Administrator, David Ritchie, Asst. City Attorney. Negotiating Parties: Pioneer Collision Center. Under Negotiation: price.

OPEN SESSION

1. Announcement from Closed Session

2. Pledge of Allegiance

3. Corrections/Changes to the Agenda

4. Recusals

5. Adoption of Agenda

RULES OF DECORUM
The Oroville City Council welcomes the public to its meetings and encourages and appreciates public engagement. The City Council expects members of the public to act in a courteous, civil, and respectful manner, and not make personal, slanderous, or profane remarks to any member of the Council, staff, or the general public. The City Council will not tolerate loud, threatening, personal, or abusive language, or disorderly conduct, which disrupts, disturbs, or otherwise impedes the orderly conduct of City Council meetings. Violation of these rules of decorum will result in the meeting being recessed.

PRESENTATIONS AND PROCLAMATIONS
None this meeting.

PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
This is the time to address the Council about any item not listed on the agenda. If you wish to address the Council on an item listed on the agenda, please follow the directions listed above. 2 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 3 of 8

REPORTS / DISCUSSIONS

1. Council Announcements and Reports

2. Administration Reports

CONSENT CALENDAR
Consent calendar items 1 – 5 are adopted in one action by the Council. Items that are removed will be discussed and voted on immediately after adoption of consent calendar items.

1. UPDATED JOB DESCRIPTION FOR DIRECTOR OF PUBLIC WORKS TO DIRECTOR OF

PUBLIC WORKS/CITY ENGINEER
The City Council shall consider updates to the job description of Director of Public Works to Director of Public Work/City Engineer, incorporating City Engineer duties.

ACTION REQUESTED -

ADOPT THE UPDATED JOB DESCRIPTION FOR DIRECTOR OF PUBLIC WORKS/CITY ENGINEER (FORMERLY DIRECTOR OF PUBLIC WORKS).

2. PURCHASE OF PATROL MOTORCYCLE IN LIEU OF PATROL VEHICLE The City Council shall consider Oroville Police Department’s request to remove one previously approved new patrol vehicle purchase in lieu of a patrol motorcycle. The motorcycle, (motors), will be put into service as a traffic unit and operated by a fully qualified motors officer. This exchange of vehicles will result in an approximate $50,000 in savings and offers greater opportunities for both the City and the Police Department.

ACTION(S) REQUESTED –

1. APPROVE THE PURCHASE OF ONE (1), 2026 HARLEY DAVIDSON ROAD GLIDE PATROL MOTORCYCLE; AND

2. REDUCE THE PURCHASE OF FIVE (5) NEW FORD EXPLORER SUV’S TO FOUR (4) FORD EXPLORER SUV’S.

3. FORECLOSURE OF 22 E GRAND AVENUE
The City Council shall consider authorizing the Director of Business Assistance and Housing Development the authority to obtain title to 22 E Grand Avenue by either initiating foreclosure proceedings or negotiating the execution of a Deed in Lieu of Foreclosure (APN 031-140-018).

ACTION REQUESTED –
ADOPT RESOLUTION NO. 9466 – A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

OROVILLE, CALIFORNIA, AUTHORIZING AND DIRECTING THE DIRECTOR OF BUSINESS

ASSISTANCE AND HOUSING DEVELOPMENT TO EXECUTE ALL DOCUMENTS AND ANY AMENDMENTS THERETO NECESSARY TO SECURE THE CITY’S INTEREST EITHER BY

INITIATING AND COMPLETING FORECLOSURE PROCEEDINGS, OR BY SECURING A DEED IN LIEU OF FORECLOSURE ON REAL PROPERTY LOCATED AT 22 EAST GRAND AVENUE, OROVILLE (APN 031-140-018).
3 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 4 of 8 HYPERLINK "appIS52fdf111d1a44e3bb3d31689fecf64c0"4. ADOPTION OF FIRE DEPARTMENT COST

RECOVERY ORDINANCE
The City Council shall consider adopting Ordinance No. 1897 establishing a Fire Department cost recovery program for certain non-emergency, preventable, or negligent incidents. The intent of this program is to help keep emergency resources available and ready for true emergencies, while still ensuring that anyone in need feels comfortable calling 911 when thy believe help is required.

ACTION REQUESTED –
ADOPT ORDINANCE NO. 1897 ADDING CHAPTER 8.06 ESTABLISHING FIRE

DEPARTMENT COST RECOVERY PROGRAM FOR CERTAIN NON-EMERGENCY, PREVENTABLE, OR NEGLIGENT INCIDENTS.

5. APPROVAL OF THE JUNE 16, 2026 CITY COUNCIL REGULAR MEETING MINUTES The City Council shall consider approving the June 6, 2026 City Council regular meeting minutes.

ACTION REQUESTED -
APPROVE MINUTES AND AUTHORIZE THE MAYOR TO SIGN.

REGULAR BUSINESS

6. PLACEMENT OF SOLID WASTE LIENS ON THE 2026-27 PROPERTY TAX ROLL The City Council shall consider the placement of solid waste liens from Recology on the 2026-27 property tax roll.

ACTION REQUESTED -
ADOPT RESOLUTION NO. 9467– A RESOLUTION OF THE OROVILLE CITY COUNCIL ADOPTING DIRECT ASSESSMENT FOR DELINQUENT SOLID WASTE LIENS ON THE 2026- 2027 PROPERTY TAX ROLL AND AUTHORIZING THE FINANCE DEPARTMENT TO EXECUTE THE PROPOSITION 218 CERTIFICATION OF TAX BILL LEVY.

HYPERLINK "appIS51f277cddb484dd9899eff7dfec1f309"7. UPDATE ON AIRPORT AND FBO

OPERATIONS
The City Council shall receive a brief update from the Airport Manager and FBO Operator on operations from FY 2025 / 2026.

ACTION REQUESTED -
ACCEPT FOR INFORMATION.
4 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 5 of 8

8. OPPORTUNITY ZONE 2.0 RECOMMENDATION TO NOMINATE CENSUS TRACTS 28, 30-1, 30-2, 32, 37, & 25 FOR FEDERAL DESIGNATION
The City Council shall consider approving an application recommending eligible census tracts for Opportunity Zone 2.0 (OZ 2.0) Designation.

ACTION(S) REQUESTED -
APPROVE AN APPLICATION RECOMMENDING CENSUS TRACTS 28, 30-1, 30-2, 32, 37, AND 25 FOR DESIGNATION; AND
ADOPT RESOLUTION NO. 9468.

Adopt Resolution 9468

9. CONTRACT WITH UNITED BUILDING CONTRACTORS, INC. FOR THE PIONEER MUSEUM

ROOF AND HVAC REPAIR PROJECTS
The City Council shall consider awarding a Construction Contract (Agreement No. 3590) to United Building Contractors, Inc. of Chico for construction of repairs to the roof and HVAC system for the Pioneer Museum.

ACTION REQUESTED -
AWARD THE PROJECT CONTRACT (A-3590) TO UBC INC.; AND AUTHORIZE THE MAYOR TO SIGN.

10. APPROVAL OF FINAL 2026 SPEED ZONE ENGINEERING AND TRAFFIC SURVEY The City Council shall consider approving the final for the 2026 Speed Zone Engineering and Traffic Survey (E&TS) performed by Wood Rodgers, Inc. of Roseville CA.

ACTION REQUESTED –
APPROVE FINAL REPORT.

11. REAPPOINTMENT OF CHRIS LOGUE TO THE HOUSING LOAN ADVISORY COMMITTEE The City Council shall consider reappointing Chris Logue to the Housing Loan Advisory Committee with a term expiring on July 6, 2028.

ACTION REQUESTED –

REAPPOINT CHRIS LOGUE TO THE HOUSING LOAN ADVISORY COMMITTEE WITH A TERM EXPIRING ON JULY 6, 2028.
5 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 6 of 8

12. APPOINTMENT OF JOSEPH VELASQUEZ TO THE OROVILLE PARK COMMISSION The City Council shall consider appointing Joseph Velasquez to serve on the Oroville Park Commission with a term expiring July 6, 2031.

ACTION REQUESTED -

APPOINT JOSEPH VELASQUEZ TO SERVE ON THE OROVILLE PARK COMMISSION WITH A TERM OF JULY 7, 2026 – JULY 6, 2031.

13. APPOINTMENT OF ROSANA ROSALES ARRAS TO THE CITIZEN’S OVERSIGHT

COMMITTEE (MEASURE U)
The City Council shall consider appointing Rosana Rosales Arras to the Citizen’s Oversight Committee (Measure U). This individual comes as a recommendation from the Executive Committee. It is requested that she be appointed for a term of July 7, 2026- July 7, 2028.

ACTION REQUESTED -
APPOINT ROSANA ROSALES ARRAS TO THE CITIZEN’S OVERSIGHT COMMITTEE (MEASURE U) WITH A TERM OF JULY 7, 2026 THROUGH JULY 7, 2028.

PUBLIC HEARINGS
The Public Hearing Procedure is as follows:
- Mayor or Chairperson opens the public hearing and staff will present the item and answer Council questions.
- The hearing is opened for public comment limited to three (3) minutes per speaker. In the event of more than ten (10) speakers, time will be limited to one and a half (1.5) minutes.

Under Government Code 54954.3, the time for each presentation may be limited. - Speakers are requested to provide a speaker card to the City Clerk - Public comment session is closed and then the Council will debate and take action - Those wishing to speak at the public hearings below, but unable to attend before 5pm, may request that the council consider holding the public hearing after 5pm by emailing [email protected] or calling 530-538-2535. Please submit request 24 hours before the meeting.
- Individuals may email comments for council consideration to [email protected]

14. 5:00PM - FISCAL YEAR 2026/27 APPROPRIATIONS LIMIT
The City Council shall conduct a public hearing and may consider the adoption of the fiscal year 2026/27 Appropriations Limit.

ACTION(S) REQUESTED -

ADOPT THE ESTABLISHMENT OF THE APPROPRIATION LIMIT FOR THE CITY OF OROVILLE FOR THE 2026/27 FISCAL YEAR; AND
ADOPT RESOLUTION NO. 9469 - A RESOLUTION OF THE OROVILLE CITY COUNCIL SETTING THE APPROPRIATIONS LIMIT (PROPOSITION 4) FOR FISCAL YEAR 2026/27. 6 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 7 of 8

15. 5:00PM - FISCAL YEAR 2026/27 ADOPTED BUDGET
The City Council shall receive the Fiscal Year 2026/27 Budget for review.

ACTION REQUESTED -
APPROVE THE CITY’S 2026/27 ANNUAL WORKING BUDGET.

16. 5:20PM AMENDMENT TO OROVILLE MUNICIPAL CODE SECTION 13.04.040 – SEWER

CONNECTION CHARGES
The City Council shall hear an introduction of an ordinance amending Section 13.04.040 of the Oroville Municipal Code to update the methodology used to calculate sewer connection charges for residential development. The proposed amendment codifies equivalent dwelling unit (EDU) factors previously approved by the City Council on June 4, 2024, as part of the City's wastewater rate study and Proposition 218 rate adjustment process. The amendment is administrative in nature and does not modify sewer connection fee amounts established by the City's Master Fee Schedule.

ACTION REQUESTED -

INTRODUCE AND WAIVE THE FIRST READING OF AN ORDINANCE AMENDING SECTION

13.04.040 OF THE OROVILLE MUNICIPAL CODE RELATING TO SEWER CONNECTION

CHARGE CALCULATIONS AND SCHEDULE THE ORDINANCE FOR SECOND READING AND ADOPTION AT A SUBSEQUENT CITY COUNCIL MEETING.

PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
This is the time to address the Council about any item not listed on the agenda. If you wish to address the Council on an item listed on the agenda, please follow the directions listed above.

FUTURE AGENDA ITEMS / CORRESPONDENCE

1. Future Agenda Items

2. Correspondence
i. June 2026 Housing and Business Assistance Monthly Report ii. OSCIA Cowhand Fundraiser Correspondence
iii. June 2026 City Clerk Department Monthly Report
iv. June 2026 City of Oroville Fire Department Monthly Report 7 July 07, 2026~3:30 PM Oroville City Council Meeting Agenda Page 8 of 8

ADJOURN THE MEETING
The meeting will be adjourned. A regular meeting of the Oroville City Council will be held on July 21, 2026 at 4:00 p.m.

Accommodating Those Individuals with Special Needs – In compliance with the Americans with Disabilities Act, the City of Oroville encourages those with disabilities to participate fully in the public meeting process. If you have a special need in order to allow you to attend or participate in our public meetings, please contact the City Clerk at (530) 538-2535, well in advance of the regular meeting you wish to attend, so that we may make every reasonable effort to accommodate you. Documents distributed for public session items, less than 72 hours prior to meeting, are available for public inspection at City Hall, 1735 Montgomery Street, Oroville, California.

Recordings - All meetings are recorded and broadcast live on cityoforoville.org and YouTube. 8 CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: MEGAN WILLIAMS, HR ANALYST
RE: UPDATED JOB DESCRIPTION FOR DIRECTOR OF PUBLIC WORKS TO

DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
DATE: JULY 7, 2026

SUMMARY
The City Council shall consider approving updates to the job description of Director of Public Works to Director of Public Work/City Engineer, incorporating City Engineer duties.

DISCUSSION
The City Council will consider adopting the attached updated job description. The job description has been updated to reflect the duties and responsibilities currently required of the Public Works Director, incorporating the duties of the City Engineer.

FISCAL IMPACT
None

ACTION REQUESTED -

ADOPT THE UPDATED JOB DESCRIPTION FOR DIRECTOR OF PUBLIC WORKS/CITY ENGINEER (FORMERLY DIRECTOR OF PUBLIC WORKS).

ATTACHMENTS
Director of Public Works/City Engineer job description (clean) Director of Public Works job description with recommended changes 9 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
1 Formatted: Font: 11 pt

CITY ENGINEER/DIRECTOR OF PUBLIC WORKS/CITY ENGINEER

JOB DESCRIPTION

DEFINITION
Under general direction of the Oroville City Council this position manages the Engineering and Public Works Department, including transportation/traffic, construction administration and inspection, land development review, public facility engineering, construction and maintenance of streets, storm drains, sewer system and public utilities, municipal airport, and capital improvement project design; formulates policy, develops goals and objectives, to ensure divisional compliance with all applicable laws, regulations and standards; supervises staff and administers the division’s budgets; performs professional civil engineering work and performs other duties as assigned.

SUPERVISION RECEIVED
General direction is received from the Oroville City Council.

SUPERVISION EXERCISED
The City Engineer/Director of Public Works/ City Engineer/provides direct supervision to professional, technical, clerical and temporary employees assigned to the department.

EXAMPLES OF ESSENTIAL FUNCTIONS: Essential functions may include, but are not limited to, the following:

Plans, organizes, directs and evaluates the functions and activities of the Engineering and Public Works Department;
Develops and implements goals, objectives, performance standards, policies and procedures;
Supervises, motivates, and evaluates work of subordinate staff and provides staff training, education and development opportunities;
Interprets and ensures departmental compliance with all federal, state, regional and local laws and regulations, City policies and procedures and standards of quality and safety; Develops, monitors and manages the departmental budgets and project schedules; Monitors and approves all purchase/payment orders;
Prepares and administers grants for special programs and projects; 10 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
2 Formatted: Font: 11 pt
Serves Overseesas the Airport Manager and serves as the Flood Plain Administrator; Directs and reviews the work of contract consultants and reviews or prepares related requests for proposals and contracts;
Reviews and approves engineering plans, specifications, and contract documents; Designs and prepares engineering plans, specifications, and contract documents; Manages and administers departmental activities, programs and projects including consultant contract administration, prepares engineering design plans, site development projects, survey, construction management and inspection, City streets and freeway interchanges, traffic controls, drainage structures, sewage collection, parking and other municipal facilities, such as an airport, and other civil engineering projects; Administers development fee programs;
Interprets City Standards in complex and unclear cases; Reviews conditions of approval for subdivisions and site developments; Recommends approval of subdivision agreements, improvement plans, subdivision and parcel maps, and final maps;
Establishes guidelines and methods for capital improvement projects related to project design, timetables and other factors;
Identifies City needs and priorities for specific public works projects; Develops and updates short and long-range goals;
Establishes and administers Standard Details and Specifications, development plans, plan check manuals, and master plans for sewer and storm drain systems, and other documents as required by Oroville Municipal Code;
Reviews transportation plans and transportation systems and establishes and reviews construction inspection criteria;
Conducts or directs analytical studies, develops and reviews reports of findings, alternatives and recommendations for the maintenance and improvement of City public works services and prepares and directs the preparation of a variety of periodic and special reports regarding departmental activities;
Formatted: Highlight
Formatted: Highlight
11 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
3 Formatted: Font: 11 pt
Designs, prepares, reviews and/or approves public improvement plans, specifications, standards and estimates and encroachment, transportation, grading, drainage and flood plain permits and land development conditions of approval and associated agreements and land development maps, deeds and other documents, including acceptance of public right-of-way dedications to the City by deeds;
Inspects or oversees inspections and evaluates public works improvement and land development projects, and public safety concerns;
Confers with and provides professional and technical assistance to City Council, City Administrator, Community Development Director, and other staff on matters related to Engineering and Public Works functions;
Coordinates departmental activities with those of other city departments and divisions, federal, state and local agencies and private groups as appropriate; Represents the department and makes presentations to City Council, Commissions, Boards, other City and community meetings; may serve on various committees, boards and commissions as appropriate;
Receives and responds to public inquiries, requests for assistance and complaints regarding departmental projects and activities;
Monitors legislation and trends in areas of responsibility and evaluates their impact on City operations and recommends and implements policy and procedural improvements; Performs general administrative work as assigned, including but not limited to conducting and attending meetings, assisting customers, researching files, scheduling appointments, reviewing correspondence, etc.;
Reviews and investigates alleged violations;
Signs final maps and plans for the City;
Develops, administers and monitors the Engineering and Public Works Department’s activities, programs and the City's capital improvement budgets, the lighting and landscape maintenance district, benefit assessment districts, sidewalk repair programs, and other related programs;
Advises City staff and others on issues relating to adopted City Standard Details and Specifications;
Prepares written reports and requests for City Council and staff regarding ordinance changes, establishment of City policy and items for City Council approval; 12 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
4 Formatted: Font: 11 pt
Interacts effectively with elected officials and staff, developers, engineers, architects, property owners, and other governmental agencies including local, state and federal; Performs other duties as assigned.

Knowledge of:

Principles and practices of organization, administration and budget; principles and practices of modern civil, structural, hydraulic, sanitary, and traffic engineering related to municipal public works design, transportation planning, pavement management, erosion control, storm drain maintenance, and public works design and construction; methods, techniques and materials employed in the construction of public works projects; processing rights-of-way acquisitions; estimating and design and preparation of plans for improvements; principles and practices of supervision; effective public speaking techniques; laws and regulatory codes related to governing land development, development and construction of public works projects and assessment districts; and personal computer operation and applications.

Departmental policies, procedures and standards related to public works maintenance and construction projects; pertinent federal, state, regional and local laws, regulations, codes and ordinances; administrative principles and methods, including goal setting and planning; organizational and management practices as applied to the analysis and evaluation of programs, policies and operational needs; principles and practices of civil engineering, land development, flood plain management, emergency management, airport operations as applied to the design, construction and maintenance of public facilities and technical inspection services; modern principles, practices, techniques, equipment, materials and tools used in public works construction / maintenance projects and daily operations; safe and proper operation of heavy construction equipment; research methods and sources of information related to public works operations; principles of supervision, training and performance evaluation; budget preparation and administration practices; principles and practices of modern office management, communications and effective employee and public relations; modern office practices and technology, including the use of computers for word and data processing and spreadsheet applications; methods of letter writing and report preparation; English usage, spelling, grammar and punctuation; safe work practices.

Ability to:

Plan, organize, coordinate and administer activities of the Engineering and Public Works Department; develop and implement programs, policies and procedures; administer and monitor division budgets and expenditures, including a capital improvement budget; formulate and administer the lighting and landscape maintenance district, benefit 13 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
5 Formatted: Font: 11 pt
assessment districts and sidewalk repair programs and other programs; interpret and effectively apply various laws, ordinances, regulations, policies and procedures; supervise, train and evaluate professional, technical and clerical staff; establish and maintain effective working relations with property owners, contractors, public officials, employees, other public agencies, community groups and the general public; keep accurate records; make effective presentations on engineering and public works matters in lay language; perform professional engineering work; prepare contract documents and comprehensive reports; supervise and coordinate construction contracts; operate a personal computer; exercise sound, fair and consistent independent judgement; solve complex problems and mediate to resolve disputes; and exemplify and foster an enthusiastic, resourceful and effective service attitude/approach with internal and external customers.

Effectively learn and apply City, department and division policies, procedures, rules and regulations, terminology, City Standards and Details, permit provisions and the City’s Geographical Information System (GIS), city maps and records system; work additional hours as necessary to meet deadlines and attend night meetings; keep current on changes/trends/technology in the engineering and public works field; participate, foster and encourage all members of the divisions to work as members of a team; Interpret, analyze and apply pertinent federal, state, regional and local laws, codes, ordinances, rules and regulations pertaining to divisional administration and operations; develop, implement and interpret goals, objectives, policies, procedures and work standards; analyze complex problems, identify alternative solutions, determine consequences of proposed actions and implement recommendations in support of goals; determine work priorities and effectively coordinate and schedule resources and staff to perform activities and projects within time limits; read and understand complex plans, specifications and blueprints; apply technical knowledge and follow proper inspection techniques to examine workmanship and materials, and detect deviations from plans, specifications, regulations and standard construction practices; exercise sound, independent judgment within general policy guidelines; perform required mathematical computations with accuracy; communicate clearly and concisely, both orally and in writing; prepare, verify, analyze and reconcile complex records, reports and recommendations; gain cooperation through discussion and persuasion, and facilitate the resolution of difficult political and controversial issues related to Engineering and Public Works plans and projects; represent the City effectively in meetings with others; interpret complex departmental projects and programs to the public.

MINIMUM REQUIREMENTS:

Experience: At least six (6) years of experience performing progressively responsible professional civil engineering work with registration in the State of California, which includes two years of experience in supervising engineering and public works staff 14 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
6 Formatted: Font: 11 pt
engaged in a variety of public works and/or land development projects including design, construction inspection, transportation, development and review.

Education: The equivalent to a Bachelor’s Degree in civil engineering from an accredited college/university. Master’s degree in an applicable field is desirable.

Certification: Registration in the State of California as a Professional Civil Engineer.

Registration in the State of California as a Land Surveyor is desirable, if civil engineering license does not cover land surveying.

License: Must possess and maintain a valid California driver's license and a satisfactory driving record, as determined by the City.

Additional Requirements: Must have the willingness and ability to work the hours necessary to accomplish the job requirements; be on-call for emergencies; travel to and attend meetings, seminars, conferences, etc. during work and non-work hours; complete continuing education requirements, as necessary;

TYPICAL WORKING CONDITIONS
Work is performed in an office and field environment. Incumbent drives on surface streets and may be exposed to traffic and construction hazards, electrical currents, air contaminants, adverse weather conditions, temperature and noise extremes, wetness, humidity, heights, fumes, dusts, odors, toxic or caustic chemicals, vibration.

TYPICAL PHYSICAL REQUIREMENTS
Essential duties require the mental and/or physical ability to work regularly in a standard office environment and periodically in a field environment involving body movement, dexterity and agility of balance and coordination while moving through restricted spaces, such as trenches and climbing ladders and stairs; requires the ability to sit at desk for long periods of time and intermittently walk, stand, climb, balance, stoop, kneel, crouch, crawl and reach while performing office duties and/or field work; occasionally lift and/or move up to 25 pounds; use hands to finger, handle, feel or operate objects, tools and controls read fine print and distinguish colors and shades of color to interpret and use maps/blue prints for prolonged periods of time; converse with others in person and by telephone; and operate a personal computer.

Approved by Council:TBD
15 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
7 Formatted: Font: 11 pt
16 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
1 DIRECTOR OF PUBLIC WORKS/CITY ENGINEER

JOB DESCRIPTION

DEFINITION
Under general direction of the Oroville City Council this position manages the Engineering and Public Works Department, including transportation/traffic, construction administration and inspection, land development review, public facility engineering, construction and maintenance of streets, storm drains, sewer system and public utilities, municipal airport, and capital improvement project design; formulates policy, develops goals and objectives, to ensure divisional compliance with all applicable laws, regulations and standards; supervises staff and administers the division’s budgets; performs professional civil engineering work and performs other duties as assigned.

SUPERVISION RECEIVED
General direction is received from the Oroville City Council.

SUPERVISION EXERCISED
The Director of Public Works/City Engineer/provides direct supervision to professional, technical, clerical and temporary employees assigned to the department.

EXAMPLES OF ESSENTIAL FUNCTIONS: Essential functions may include, but are not limited to, the following:

Plans, organizes, directs and evaluates the functions and activities of the Engineering and Public Works Department;
Develops and implements goals, objectives, performance standards, policies and procedures;
Supervises, motivates, and evaluates work of subordinate staff and provides staff training, education and development opportunities;
Interprets and ensures departmental compliance with all federal, state, regional and local laws and regulations, City policies and procedures and standards of quality and safety; Develops, monitors and manages the departmental budgets and project schedules; Monitors and approves all purchase/payment orders;
Prepares and administers grants for special programs and projects; 17 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
2 Oversees the Airport Manager and serves as the Flood Plain Administrator; Directs and reviews the work of contract consultants and reviews or prepares related requests for proposals and contracts;
Reviews and approves engineering plans, specifications, and contract documents; Designs and prepares engineering plans, specifications, and contract documents; Manages and administers departmental activities, programs and projects including consultant contract administration, prepares engineering design plans, site development projects, survey, construction management and inspection, City streets and freeway interchanges, traffic controls, drainage structures, sewage collection, parking and other municipal facilities, such as an airport, and other civil engineering projects; Administers development fee programs;
Interprets City Standards in complex and unclear cases; Reviews conditions of approval for subdivisions and site developments; Recommends approval of subdivision agreements, improvement plans, subdivision and parcel maps, and final maps;
Establishes guidelines and methods for capital improvement projects related to project design, timetables and other factors;
Identifies City needs and priorities for specific public works projects; Develops and updates short and long-range goals;
Establishes and administers Standard Details and Specifications, development plans, plan check manuals, and master plans for sewer and storm drain systems, and other documents as required by Oroville Municipal Code;
Reviews transportation plans and transportation systems and establishes and reviews construction inspection criteria;
Conducts or directs analytical studies, develops and reviews reports of findings, alternatives and recommendations for the maintenance and improvement of City public works services and prepares and directs the preparation of a variety of periodic and special reports regarding departmental activities;
18 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
3 Designs, prepares, reviews and/or approves public improvement plans, specifications, standards and estimates and encroachment, transportation, grading, drainage and flood plain permits and land development conditions of approval and associated agreements and land development maps, deeds and other documents, including acceptance of public right-of-way dedications to the City by deeds;
Inspects or oversees inspections and evaluates public works improvement and land development projects, and public safety concerns;
Confers with and provides professional and technical assistance to City Council, City Administrator, Community Development Director, and other staff on matters related to Engineering and Public Works functions;
Coordinates departmental activities with those of other city departments and divisions, federal, state and local agencies and private groups as appropriate; Represents the department and makes presentations to City Council, Commissions, Boards, other City and community meetings; may serve on various committees, boards and commissions as appropriate;
Receives and responds to public inquiries, requests for assistance and complaints regarding departmental projects and activities;
Monitors legislation and trends in areas of responsibility and evaluates their impact on City operations and recommends and implements policy and procedural improvements; Performs general administrative work as assigned, including but not limited to conducting and attending meetings, assisting customers, researching files, scheduling appointments, reviewing correspondence, etc.;
Reviews and investigates alleged violations;
Signs final maps and plans for the City;
Develops, administers and monitors the Engineering and Public Works Department’s activities, programs and the City's capital improvement budgets, the lighting and landscape maintenance district, benefit assessment districts, sidewalk repair programs, and other related programs;
Advises City staff and others on issues relating to adopted City Standard Details and Specifications;
Prepares written reports and requests for City Council and staff regarding ordinance changes, establishment of City policy and items for City Council approval; 19 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
4 Interacts effectively with elected officials and staff, developers, engineers, architects, property owners, and other governmental agencies including local, state and federal; Performs other duties as assigned.

Knowledge of:

Principles and practices of organization, administration and budget; principles and practices of modern civil, structural, hydraulic, sanitary, and traffic engineering related to municipal public works design, transportation planning, pavement management, erosion control, storm drain maintenance, and public works design and construction; methods, techniques and materials employed in the construction of public works projects; processing rights-of-way acquisitions; estimating and design and preparation of plans for improvements; principles and practices of supervision; effective public speaking techniques; laws and regulatory codes related to governing land development, development and construction of public works projects and assessment districts; and personal computer operation and applications.

Departmental policies, procedures and standards related to public works maintenance and construction projects; pertinent federal, state, regional and local laws, regulations, codes and ordinances; administrative principles and methods, including goal setting and planning; organizational and management practices as applied to the analysis and evaluation of programs, policies and operational needs; principles and practices of civil engineering, land development, flood plain management, emergency management, airport operations as applied to the design, construction and maintenance of public facilities and technical inspection services; modern principles, practices, techniques, equipment, materials and tools used in public works construction / maintenance projects and daily operations; safe and proper operation of heavy construction equipment; research methods and sources of information related to public works operations; principles of supervision, training and performance evaluation; budget preparation and administration practices; principles and practices of modern office management, communications and effective employee and public relations; modern office practices and technology, including the use of computers for word and data processing and spreadsheet applications; methods of letter writing and report preparation; English usage, spelling, grammar and punctuation; safe work practices.

Ability to:

Plan, organize, coordinate and administer activities of the Engineering and Public Works Department; develop and implement programs, policies and procedures; administer and monitor division budgets and expenditures, including a capital improvement budget; formulate and administer the lighting and landscape maintenance district, benefit assessment districts and sidewalk repair programs and other programs; interpret and effectively apply various laws, ordinances, regulations, policies and procedures; 20 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
5 supervise, train and evaluate professional, technical and clerical staff; establish and maintain effective working relations with property owners, contractors, public officials, employees, other public agencies, community groups and the general public; keep accurate records; make effective presentations on engineering and public works matters in lay language; perform professional engineering work; prepare contract documents and comprehensive reports; supervise and coordinate construction contracts; operate a personal computer; exercise sound, fair and consistent independent judgement; solve complex problems and mediate to resolve disputes; and exemplify and foster an enthusiastic, resourceful and effective service attitude/approach with internal and external customers.

Effectively learn and apply City, department and division policies, procedures, rules and regulations, terminology, City Standards and Details, permit provisions and the City’s Geographical Information System (GIS), city maps and records system; work additional hours as necessary to meet deadlines and attend night meetings; keep current on changes/trends/technology in the engineering and public works field; participate, foster and encourage all members of the divisions to work as members of a team; Interpret, analyze and apply pertinent federal, state, regional and local laws, codes, ordinances, rules and regulations pertaining to divisional administration and operations; develop, implement and interpret goals, objectives, policies, procedures and work standards; analyze complex problems, identify alternative solutions, determine consequences of proposed actions and implement recommendations in support of goals; determine work priorities and effectively coordinate and schedule resources and staff to perform activities and projects within time limits; read and understand complex plans, specifications and blueprints; apply technical knowledge and follow proper inspection techniques to examine workmanship and materials, and detect deviations from plans, specifications, regulations and standard construction practices; exercise sound, independent judgment within general policy guidelines; perform required mathematical computations with accuracy; communicate clearly and concisely, both orally and in writing; prepare, verify, analyze and reconcile complex records, reports and recommendations; gain cooperation through discussion and persuasion, and facilitate the resolution of difficult political and controversial issues related to Engineering and Public Works plans and projects; represent the City effectively in meetings with others; interpret complex departmental projects and programs to the public.

MINIMUM REQUIREMENTS:

Experience: At least six (6) years of experience performing progressively responsible professional civil engineering work with registration in the State of California, which includes two years of experience in supervising engineering and public works staff engaged in a variety of public works and/or land development projects including design, construction inspection, transportation, development and review. 21 Item 1.

CITY OF OROVILLE
Approved by Council: TBD
6 Education: The equivalent to a Bachelor’s Degree in civil engineering from an accredited college/university. Master’s degree in an applicable field is desirable.

Certification: Registration in the State of California as a Professional Civil Engineer.

Registration in the State of California as a Land Surveyor is desirable, if civil engineering license does not cover land surveying.

License: Must possess and maintain a valid California driver's license and a satisfactory driving record, as determined by the City.

Additional Requirements: Must have the willingness and ability to work the hours necessary to accomplish the job requirements; be on-call for emergencies; travel to and attend meetings, seminars, conferences, etc. during work and non-work hours; complete continuing education requirements, as necessary;

TYPICAL WORKING CONDITIONS
Work is performed in an office and field environment. Incumbent drives on surface streets and may be exposed to traffic and construction hazards, electrical currents, air contaminants, adverse weather conditions, temperature and noise extremes, wetness, humidity, heights, fumes, dusts, odors, toxic or caustic chemicals, vibration.

TYPICAL PHYSICAL REQUIREMENTS
Essential duties require the mental and/or physical ability to work regularly in a standard office environment and periodically in a field environment involving body movement, dexterity and agility of balance and coordination while moving through restricted spaces, such as trenches and climbing ladders and stairs; requires the ability to sit at desk for long periods of time and intermittently walk, stand, climb, balance, stoop, kneel, crouch, crawl and reach while performing office duties and/or field work; occasionally lift and/or move up to 25 pounds; use hands to finger, handle, feel or operate objects, tools and controls read fine print and distinguish colors and shades of color to interpret and use maps/blue prints for prolonged periods of time; converse with others in person and by telephone; and operate a personal computer.
22 Item 1.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: JASON WINES, CHIEF OF POLICE
RE: PURCHASE OF PATROL MOTORCYCLE IN LIEU OF PATROL VEHICLE DATE: JULY 7, 2026

SUMMARY
The City Council shall consider Oroville Police Department’s request to remove one previously approved new patrol vehicle purchase in lieu of a patrol motorcycle. The motorcycle, (motors), will be put into service as a traffic unit and operated by a fully qualified motors officer. This exchange in vehicles will result in an approximate $50,000 in savings and offers greater opportunities for both the City and the Police Department.

DISCUSSION
On April 21, 2026 the City Council approved the purchase of five (5) new patrol vehicles, four being additional vehicles and one being a replacement. The total not-to exceed cost per vehicle, completely outfitted, was $94,000.

After the approval to purchase, the City budget reflected a need for departments to tighten their belts. As other adjustments were made, the Police Department reviewed the patrol vehicle request and found a way to reduce a little over 10% of the overall vehicle purchase request.

Law enforcement studies year over year show the extreme benefit when agencies implement a motors program. Due to their reduced operational costs, maneuverability, versatility, and the dedicated resource, motor officers are quicker to accidents, more maneuverable and better positioned to address difficult traffic issues.

The Police Department is fortunate to have recently hired a lateral officer from a neighboring county. This officer has years of experience operating a motors unit and was very effective in his role while working in a contract city. Considering both the officer’s experience and the desire to reduce expenditures, the Police Department is requesting to remove one new patrol vehicle purchase in exchange for purchasing a patrol motorcycle. The cost to fully purchase and outfit one patrol vehicle is approximately $94,000.

We recently received a quote for a fully outfitted motorcycle, to include all the associated riding equipment, at $37,349. When implemented, the motors officer will be attached to the downtown patrol team and will focus on traffic enforcement, transient related crimes and will participate in school outreach. Given the fluctuation of costs, the Police Department is requesting the amount 23 Item 2.
for the motorcycle and related equipment of $37,350, with the not-to-exceed cost of $41,000 to accommodate for unforeseen increases.

FISCAL IMPACT
A reduction of original patrol vehicle request of approximately $53,000.

ACTION(S) REQUESTED -
APPROVE THE PURCHASE OF ONE (1), 2026 HARLEY DAVIDSON ROAD GLIDE PATROL MOTORCYCLE; AND
REDUCE THE PURCHASE OF FIVE (5) NEW FORD EXPLORER SUV’S TO FOUR (4) FORD EXPLORER SUV’S.

ATTACHMENTS
Equipment pricing lists and vehicle purchase quote from Harley Davison of Yuba City 24 Item 2.
25 Item 2.
26 Item 2.
27 Item 2.
28 Item 2.
29 Item 2.
30 Item 2.
31 Item 2.
32 Item 2.
33 Item 2.
34 Item 2.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: AMY BERGSTRAND, DIRECTOR BUISNESS ASSISTANCE/HOUSING

DEVELOPMENT
RE: FORECLOSURE OF 22 EAST GRAND AVENUE
DATE: JULY 7, 2026

SUMMARY
The City Council shall consider authorizing the Director of Business Assistance and Housing Development the authority to obtain title to 22 East Grand Avenue by either initiating foreclosure proceedings or negotiating the execution of a Deed in Lieu of Foreclosure (APN 031-140-018).

DISCUSSION
Staff is requesting authorization from the Council to either initiate foreclosure on the property located at 22 East Grand Avenue or work with the borrower to obtain a Deed in Lieu of Foreclosure. The current property owner obtained a mortgage subsidy loan through the City’s Homeownership Assistance Program in the amount of $85,500 in September of 2016.

The borrower is in default on their mortgage with Mortgage Electronic Registration Systems which holds the first lien position. The approximate amount to cure the default would be $120,714.14, to secure the City’s lien position. This amount is good through June 26, 2026. Based on advice from the City’s real estate contractor, the estimated value is $329,000.00.

Address Amount due to
Primary Lender
Amount of City
Loan (contingent
deferred interest)
Total Loans Value Based on Real
Estate Advice
22 East
Grand Ave
$120,714.14 $110,566.73 $231,280.87 $329,000
If the City Council authorizes staff to secure the City’s interest in this property, staff is proposing that the property be resold on the open market to recoup homebuyer loan costs. Staff recommends either redeeming the primary loan and initiating our own foreclosure to recoup the City’s investment of this property or working with the borrower to obtain a Deed in Lieu of Foreclosure. Staff has not gained access to the interior of the home to determine what, if any, repairs are needed. Staff will bring these items back to Council if repairs in excess of normal wear and tear maintenance are required. 35 Item 3.

FISCAL IMPACT
There is no general fund impact. Approximately $120,714.14 will be needed to cure the default from Fund 225 (City Revolving Loan Fund) or fund 220 (Housing Program Fund).

ACTION REQUESTED -
ADOPT RESOLUTION NO. 9466 – A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

OROVILLE, CALIFORNIA, AUTHORIZING AND DIRECTING THE DIRECTOR OF BUSINESS

ASSISTANCE AND HOUSING DEVELOPMENT TO EXECUTE ALL DOCUMENTS AND ANY AMENDMENTS THERETO NECESSARY TO SECURE THE CITY’S INTEREST EITHER BY

INITIATING AND COMPLETING FORECLOSURE PROCEEDINGS, OR BY SECURING A DEED IN LIEU OF FORECLOSURE ON REAL PROPERTY LOCATED AT 22 EAST GRAND AVENUE, OROVILLE (APN 031-140-018).

ATTACHMENTS
Resolution No. 9466
36 Item 3.

Page 1 of 1 ends

CITY OF OROVILLE
RESOLUTION NO. 9466

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OROVILLE, CALIFORNIA,

AUTHORIZING AND DIRECTING THE DIRECTOR OF BUSINESS ASSISTANCE AND

HOUSING DEVELOPMENT TO EXECUTE ALL DOCUMENTS AND ANY AMENDMENTS THERETO NECESSARY TO SECURE THE CITY’S INTEREST EITHER BY INITIATING

AND COMPLETING FORECLOSURE PROCEEDINGS, OR BY SECURING A DEED IN LIEU OF FORECLOSURE ON REAL PROPERTY LOCATED AT 22 EAST GRAND AVENUE OROVILLE (APN 031-140-018).

NOW, THEREFORE, BE IT RESOLVED by the Oroville City Council as follows:

1. The Director of Business Assistance and Housing Development is hereby authorized and directed to execute all documents and any amendments thereto necessary to secure the City’s interest either by initiating and completing foreclosure proceedings, or by securing a Deed in Lieu of Foreclosure on real property located at 22 East Grand Avenue, Oroville CA, (APN 031-140-018) Oroville, California; and

2. The City Clerk shall attest to the adoption of this Resolution.

PASSED AND ADOPTED by the City Council of the City of Oroville at a regular meeting on July 7, 2026, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

David Pittman, Mayor
APPROVED AS TO FORM: ATTEST:
____
David Ritchie, Assistant City Attorney Kayla Reaster, Assistant City Clerk 37 Item 3.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: CHRIS TENNS, FIRE CHIEF
RE: ADOPTION OF FIRE DEPARTMENT COST RECOVERY ORDINANCE DATE: JULY 7, 2026

SUMMARY
The City Council shall consider adopting Ordinance No. 1897 establishing a Fire Department cost recovery program for certain non-emergency, preventable, or negligent incidents. The intent of this program is to help keep emergency resources available and ready for true emergencies, while still ensuring that anyone in need feels comfortable calling 911 when thy believe help is required.

DISCUSSION
Following direction from the City Council, at the June 16th meeting staff updated the proposed ordinance to incorporate the feedback and strengthen how the program will be applied. The ordinance adds chapter 8.06 to the Oroville Municipal Code and outlines when the City may recover the actual cost of certain Fire Department responses. These situations may include repeated false alarms, non-emergency public assists, or incidents resulting from negligence or code violations.

The ordinance also clearly defines exemptions for bona fide emergencies and good faith calls, reinforcing that the priority remains immediate response to life safety incidents without hesitation.

The proposed ordinance includes a review process through a Cost Recovery Review Committee and introduces warning notices for repeat or preventable non-emergency incidents, giving individuals and businesses an opportunity to address issues before any charges are considered.

Each incident is evaluated on a case-by-case basis, with the ability to reduce or waive fees when appropriate. Overall, the approach is intended to promote responsible use of emergency services while helping maintain the Fire Department’s ability to respond when it matters most.

The public hearing for this ordinance occurred on the June 16, 2026 City Council meeting.

FISCAL IMPACT
None.

ACTION REQUESTED –
ADOPT ORDINANCE NO. 1897 ADDING CHAPTER 8.06 ESTABLISHING FIRE

DEPARTMENT COST RECOVERY PROGRAM FOR CERTAIN NON-EMERGENCY, PREVENTABLE, OR NEGLIGENT INCIDENTS.
38 Item 4.

ATTACHMENTS
Ordinance No. 1897
39 Item 4.

ORDINANCE NO. __1897___ (FULL CHANGE VERSION)

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF OROVILLE ADDING CHAPTER

8.06 TO TITLE 8 OF THE OROVILLE MUNICIPAL CODE RELATING TO FIRE DEPARTMENT

COST RECOVERY
SECTION 1. Findings and Purpose
The City Council of the City of Oroville finds and declares:

A. The Oroville Fire Department provides essential emergency and life safety services to protect the public health, safety, and welfare.

B. The City recognizes that individuals should not hesitate to contact emergency services when a personal reasonably appears to require emergency assistance.

C. The purpose of this chapter is not to discourage legitimate requests for emergency assistance nor to imposed fees upon individuals acting in good faith during actual or perceived emergency events.

D. The City further finds that certain facilities, businesses, individuals have repeatedly relied upon City emergency response personnel to perform routine, operational, non-emergency assistance that are reasonably expected to be addressed through adequate staffing, training, equipment by the business itself.

E. Repeated non-emergency or preventable service requests diverts limited public safety resources from emergency readiness, increases response times and places an undue burden on limited taxpayer-funded resources, personnel, and equipment.

F. The City Council seeks to authorize cost recovery in appropriate circumstances while ensuring that no person is discouraged from seeking emergency assistance when a reasonable belief exists that a true emergency is occurring.

G. This Chapter is intended to supplement, and not replace, existing cost recovery authority, including Chapter 10.24 of this Code.

Chapter 8.06

FIRE DEPARTMENT COST RECOVERY

8.06.010 – Definitions
A. “Actual Cost” means the full direct and indirect cost of providing Fire Department services, including but not limited to personnel wages and benefits, apparatus, fuel, maintenance, equipment use, materials, supplies, administrative overhead, dispatch services, and any contracted services, as established by the City’s Master Fee Schedule.

B. “Billable Incident” means a Fire Department response that has been reviewed and approved for cost recovery in accordance with Section 10.28.020 of this Chapter.

C. “Responsible Party” means any person, business, corporation, property owner, occupant, or legal entity whose acts, negligence, omissions, violations, or service requests caused or necessitated a Billable Incident.
40 Item 4.

D. “Bona Fide Emergency” means a situation in which a reasonable person would believe that an immediate threat to life, health, or significant property damage exists, requiring urgent Fire Department response.

E. “Non-Emergency Incident” means a request for service in which no immediate threat to life, health, or property exists, and where the need for response is avoidable, repetitive, or discretionary in nature.

F. “Warning Notice” means a written notice issued by the City advising a Responsible Party that future similar incidents may be subject to cost recovery under this Chapter.

8.06.020 – Authority to Recover Costs and Review Process A. The City is authorized to recover the Actual Cost of Billable Incidents.

B. No invoice shall be issued under this Chapter unless the incident has been reviewed and approved by the Cost Recovery Review Committee. The Cost Recovery Review Committee shall consist of:

1. The Fire Chief, or designee;

2. The City Administrator, or designee; and

3. The City Attorney, or designee.

C. The Committee shall determine:

1. Whether the incident qualifies as a Billable Incident;

2. Whether a Warning Notice should be issued;

3. Whether billing is appropriate and reasonable; and

4. Whether full or partial cost recovery shall be pursued; D. Approval by a majority of the Committee shall be required to authorize issuance of an invoice.

8.06.030 – Billable Incidents
Billable Incidents may include, but are not limited to:

A. False and Preventable Alarms

1. Excessive false fire alarms beyond thresholds established in the Master Fee Schedule.

2. Alarm activations caused by system malfunction due to lack of maintenance.

3. Alarm activations resulting from construction activity without proper notification.

B. Non-Emergency Public Assists

1. Lift assists or “help-up” calls where no acute medical condition or injury is present.

2. Non-emergency assistance requests by a private business, facility, or property owner.

3. Welfare checks or service calls where no emergency condition exists.

C. Negligence or Unlawful Conduct

1. Motor vehicle collisions involving negligent or unlawful operation, including DUI. 41 Item 4.

2. Hazardous materials releases caused by negligence or regulatory violations.

3. Unauthorized burning or fire code violations requiring response.

4. Fireworks violations requiring response.

D. Specialized or Resource Intensive Responses

1. Technical rescue incidents (confined space, trench, rope rescue) caused by negligent acts.

2. Water rescue or swift water response due to reckless behavior.

3. Illegal campfires or warming fires requiring suppression.

4. Fire investigations resulting from negligent or unlawful activity.

E. Business and Commercial Activity Responses

1. Service requests made by private businesses for non-emergency assistance.

2. Fire watch services.

3. Standby services for events without required permits.

4. Failure to maintain required fire protection systems.

F. Other Discretionary Responses
Any Fire Department response that the Cost Recovery Review Committee determines.

1. Did not involve a Bona Fide Emergency.

2. Was avoidable, excessive, or due to misuse of emergency services.

3. Is otherwise appropriate for cost recovery under applicable law.

8.06.040 – Exemptions to Cost Recovery Efforts
This Chapter shall not apply to:

A. Bona fide life-threatening medical emergencies.

B. Good faith emergency calls where immediate threat to life or property reasonably appeared to exist.

C. Mutual aid responses unless otherwise governed by agreement.

D. Incidents where cost recovery is prohibited by state or federal law.

8.06.050 – Fees and Master Fee Schedule
A. Charges shall be imposed as established in the City of Oroville Master Fee Schedule, as adopted and amended by City Council resolution.

B. The City Council may establish, revise, or update cost recovery rates by resolution without amendment to this Chapter.

8.06.060 – Billing and Collection
A. The City may invoice the Responsible Party and/or their insurer.

B. Prior to issuing an invoice for a Billable Incident the City may issue a Warning Notice to the Responsible Party.
42 Item 4.

C. Any Warning Notice issued shall identify the conduct or condition giving rise to potential cost recovery and provide an opportunity for corrective action.

D. Payment of any invoice shall be due within thirty (30) days of issuance.

E. Any unpaid balance shall constitute a debt owed to the City.

F. The City may pursue all lawful means of collection, including civil action or referral to a collection agency.

SECTION 2 – Severability
If any section, subsection, sentence, clause, or phrase of this Ordinance is held invalid, such invalidity shall not affect the remaining portions, which shall remain in full force and effect. 43 Item 4.

June 16, 2026~4:00 PM Oroville City Council Meeting Minutes Page 1 of 6

OROVILLE CITY COUNCIL
Council Chambers
1735 Montgomery Street
Oroville, CA. 95965
June 16, 2026

REGULAR MEETING

MINUTES

CALL TO ORDER / ROLL CALL
Present Council Members: Chuck Reynolds, Scott Thomson, Tracy Johnstone, Janet Goodson, Shawn Webber, Vice Mayor Eric Smith, Mayor David Pittman

CLOSED SESSION
The City Council held a Closed Session on the following:

1. The City Council met for a Conference with Legal Counsel – Anticipated Litigation, Initiation of litigation pursuant to Gov. Code § 54956.9(c): (one (1) case)

2. The City Council met to confer regarding Real Property Negotiations under Government Code § 54956.8:
i) Property: 225 Chuck Yeager Way, Oroville, CA 95965 Agency Negotiator(s): Brian Ring, City Administrator, David Ritchie, Asst. City Attorney. Negotiating Parties: All current Ground Lease Tenants. Under Negotiation: price, terms of payment.

OPEN SESSION

1. Announcement from Closed Session – No reportable action taken; direction given to staff.

2. Pledge of Allegiance – led by Council Member Johnstone.

3. Corrections/Changes to the Agenda – None.

4. Recusals – None.

5. Adoption of Agenda
Motioned by: Council Member Goodson Seconded by: Vice Mayor Smith AYES: Council Member(s) Reynolds, Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: None
44 Item 5.

June 16, 2026~4:00 PM Oroville City Council Meeting Minutes Page 2 of 6 PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
The following member(s) of the public submitted public comments on this item: Rhonda Magnusson, Deanne Boswell, Shane Gower, and Nathaniel Jones.

REPORTS / DISCUSSIONS

1. Council Announcements and Reports
Mayor Pittman: He and City Administrator Brian Ring went to Lathrop to visit the Irrigation District and see their powerplant operations. Additionally, Mayor Pittman complimented all of the graduates, as well as the Juneteenth celebration held on Saturday at MLK Park in Southside Oroville.

Council Member Webber: The July OCDC meeting will happen on July 13th at 5:30PM. They will be revealing “Oroville Youth in Action”.

Council Member Thomson: Compliments to the swearing in event of Congressman James Gallagher held at the Oroville State Theater. Thomson was in Washington DC during Gallaghers official swearing into Congress. Lastly, he also visited Virginia recently and got to work with the National Association of Christian Lawmakers.

Council Member Johnstone: Is working to collaborate with other non-profits in Oroville and has acquired the old Hope Center building for Oroville Youth Sports Complex.

Vice Mayor Smith: Reminded the public that the 4th of July celebration will take place at Riverbend Park. CalFire and the Oroville Police Department will be there to assist with the event.

Council Member Reynolds: Attended a Veterans Memorial Committee meeting in which he learned that the individual named Phillip who created the statues at the memorial passed away. Reynolds thanked him for his work and dedication to the community.

2. Administration Reports
Tim Kaber, Director of Public Works: Provided a Council report – see attached.

Kayla Reaster, Assistant City Clerk: Notified Council and the public when the candidate filing period is for the upcoming November 3, 2026 election (July 13 - August 7). The seats that are available are Districts A, B, F, the Mayor, and the City Treasurer.

Chris Tenn, Fire Chief: Fire season is here. All burning has been suspended, permit or otherwise for the time being. The Fire Department is shooting for June 24th and 25th for burning of brush at the airport.

Pat Piatt, Director of Community Development: Museums are now under the purview of the Community Development Department. Hours will be shifting to open and close one hour earlier than normal.

CONSENT CALENDAR
Consent calendar items 1 - 4 were adopted in one action by the Council. Items that are removed will be discussed and voted on immediately after adoption of consent calendar items.

Motioned by: Council Member Reynolds Seconded by: Council Member Goodson AYES: Council Member(s) Reynolds, Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: None
45 Item 5.

June 16, 2026~4:00 PM Oroville City Council Meeting Minutes Page 3 of 6

1. CONTRACT WITH CRBR FOR CITY HALL STORAGE ROOM EXTERIOR WALL REPAIRS The City Council awarded a Construction Contract to CRBR Property Damage Services of Chico for construction of repairs to the southwest exterior wall of Oroville City Hall adjoining the storage room in the Finance department.

2. HOUSING NAVIGATION SERVICES MOU EXTENSION
The City Council extended the current agreement to provide Housing Navigation Services as described in the attached Memorandum of Understanding between Butte County’s Department of Employment and Social Services and the City of Oroville.

3. AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH TROVER

CONSTRUCTION PROJECT MANAGEMENT LLC TO INCREASE CONTRACT AMOUNT The City Council amended the Professional Services Agreement with Trover Construction Project Management LLC to increase the contract amount by $92,800.

4. APPROVAL OF THE JUNE 2, 2026 CITY COUNCIL REGULAR MEETING MINUTES The City Council approved the June 2, 2026 regular meeting minutes.

REGULAR BUSINESS

5. FISCAL YEAR 2026/27 PRELIMINARY BUDGET
The City Council received the Fiscal Year 2026/27 Preliminary Budget as information.

6. NEW TWO-YEAR AGREEMENT WITH SHAW, YODER, SCHMELZER, ANTWIH AND

LANGE FOR STATE LEGISLATIVE ADVOCACY SERVICES
The City Council approved a new two-year agreement (A-3588) with Shaw, Yoder, Antwih, Schmelzer and Lange for State legislative advocacy services by the following vote:

Motioned by: Council Member Goodson Seconded by: Council Member Webber AYES: Council Member(s) Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: Council Member Reynolds
ABSTAINED: None
ABSENT: None
46 Item 5.

June 16, 2026~4:00 PM Oroville City Council Meeting Minutes Page 4 of 6

7. NEW TWO-YEAR AGREEMENT WITH THE FERGUSON GROUP FOR FEDERAL

LEGISLATIVE ADVOCACY SERVICES
The City Council approved a new two-year agreement with The Ferguson Group for federal legislative advocacy services by the following vote:

Motioned by: Council Member Goodson Seconded by: Council Member Webber AYES: Council Member(s) Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: Council Member Reynolds
ABSTAINED: None
ABSENT: None

8. INSTALLATION OF UNITED STATES NATIONAL MOTTO “IN GOD WE TRUST” IN THE

COUNCIL CHAMBERS
The City Council directed staff to coordinate the installation of the motto above the City Council dais once funds have been raised to purchase the installation by the following vote:

Motioned by: Council Member Johnstone Seconded by: Council Member Reynolds AYES: Council Member(s) Reynolds, Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: None

9. RESOLUTION REGARDING BALLOT MEASURES FOR THE NOVEMBER 3, 2026 GENERAL

MUNICIPAL ELECTION
The City Council adopted Resolution No. 9465 formalizing the measures the Council would like to place on the ballot for the November 3, 2026 General Municipal Election by the following vote:

Motioned by: Council Member Johnstone Seconded by: Council Member Goodson AYES: Council Member(s) Reynolds, Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: None
47 Item 5.

June 16, 2026~4:00 PM Oroville City Council Meeting Minutes Page 5 of 6

PUBLIC HEARINGS

10. 5:00PM - FIRE DEPARTMENT COST RECOVERY – MANAGING SERVICE DEMAND Public hearing opened at: 5:25PM Public hearing closed at: 5:27PM The City Council waived the first reading of the ordinance establishing a Fire Department cost recovery program for certain non-emergency, preventable, or negligent incidents. The Council directed staff to bring back the item at the July 7, 2026 City Council meeting for formal adoption by the following vote:

Motioned by: Council Member Reynolds Seconded by: Council Member Johnstone AYES: Council Member(s) Reynolds, Thomson, Johnstone, Goodson, Webber, Vice Mayor Smith, Mayor Pittman
NOES: None
ABSTAINED: None
ABSENT: None
PUBLIC COMMUNICATION – HEARING OF NON-AGENDA ITEMS
None received.

FUTURE AGENDA ITEMS / CORRESPONDENCE

1. Future Agenda Items -None.

2. Correspondence
i. CODE ENFORCEMENT MONTHLY REPORT - MAY 2026
ii. FIRE DEPARTMENT MONTHLY REPORT - MAY 2026
iii. CITY CLERK MONTHLY REPORT - MAY 2026
iv. PG&E REQUESTING $3,176 MILLION IN REVENUE FOR ENERGY RESOURCE

RECOVERY ACCOUNT

ADJOURN THE MEETING
The meeting was adjourned at 5:50PM.
_______________________________ ___________________________________ Kayla Reaster, Assistant City Clerk David Pittman, Mayor 48 Item 5.

June 16, 2026~4:00 PM Oroville City Council Meeting Minutes Page 6 of 6 49 Item 5.

CITY OF OROVILLE

PUBLIC WORKS DEPARTMENT CITY COUNCIL UPDATE
May – June 2026
Prepared by: Tim, Cody, Jamie, Wade, and Nancy
Date: 06/16/2026
This monthly newsletter highlights key activities in each Public Works division with visuals and brief updates.

Misc. Notes:
• Continuing making changes and working on new Website
• Continuing to work through requests via new 311 system o 27 requests submitted during reporting period
o 7 open (Tree cleanup, broken sidewalks)
• Working on Service Agreements for Civil, Electrical, Mechanical, and Traffic engineering consultants.
50 Item 5.
✈️ Airport Division
Operations:
• Numerous NOTAMs filed with the FAA for ongoing airport project work. • Extensive work and coordination with the legal team and City Administrator regarding current and upcoming ground lease expirations (ongoing). • Draft extension for DMV / CDL test area on Chuck Yeager Way • Worked with BCMVCD regarding future potential expansion footprint • Continued work on ALP update
• Repairs to rotating beacon
• Prepared and submitted additional FAA grant drawdown packages for AIP028, AIP029, and AIP030.
• Prepared additional grant closeout documents for AIP 027 • Assist with preperation (vegetation management/groundwork) for Airport Day • Airport Day 2026
• Airport “Special Event” for astronomy based gathering 5/29/26 • Extensive vegetation management / flail mowing all runway and taxiway edges and Luma Curves, areas near Graphic Packaging
• Updated DOT logs
• Completed numerous additional online trainings.
• Fuel Sales:
o 1,444 gallons of AvGas sold (66 transactions)
o 1161.48 gallons of Jet A sold (14 transactions)
o 186 gallons of Jet A sold from the fuel truck (1 transaction) Maintenance:
• Lubricated Various Hangar Doors
• Daily Lighting Inspections
• Daily OFD inspections
Projects:
• Long term ground lease proposals / options

51 Item 5.
📐 Engineering Division
2000 Challenger Avenue Update
Draft contract is in review by Staff. Anticipate presenting to Council 1st meeting in July for award. This is a slip from this meeting.

The design will be complete well before the anticipated CBDG deadline in the 2027 cycle. 52 Item 5.

Hewitt Park Update
Small dog park netting installed, blends in with the setting and is not an eyesore.

New signs will go up at each entrance for scooters/bikes/skates/e-scooters.

Splash pad will have a scheduled closure between 4 p.m. and 5 p.m. daily to help mitigate downtime.

Metal slide will be closed during the middle of the day for hot surfaces.

Work not yet scheduled:
• Parking Lot lights (ordered, planned for later this Spring/Summer for PW installation)
Parks Commission has asked to review the rental periods for the pavillion.

Current rental usage as of June 11th:

April:
9am - 12pm: 3
1pm - 4pm: 7
All day: 3
May:
9am - 12pm: 5
1pm - 4pm: 11
All day: 2
June (so far):
9am - 12pm: 3
1pm - 4pm: 6
All day: 3
Pickleball only: 2
53 Item 5.

Corporation Yard Update
Contractor: United Building Contractors (UBC)
Architect: Studio W
Phase II contract award: April 21, 2026
Amount: $1,747,985.00.

Discussion:

Contractor has begun design phase. Design phase will last approx. 4 months, after which construction will begin.

Staff will coordinate for earliest possible safe occupancy of Admin building.

Bedrock Park
Contract Award Date: April 15, 2025
Contractor: Melton Design Group, Inc.

Contract Amount: $103,175
50% design documents were presented to City Council on June 2nd. Staff is incorporating direction from Council.

Will be presented to City Council on May 5th.

Project Phasing:
✓ Task 1 – Project Launch and Coordination
✓ Task 2 – Site Analysis, Topographic Survey, Base Development ✓ Task 3 – Master Plan, Program Development, Cost Analysis •Task 4 – Design Development to 50% (Phase 1 only) - Current phase in execution •Task 5 – Construction Drawings, Specs, Submittals (Phase 1 Only) •Task 6 – Bid and Construction Administration (Phase 1 Only) 54 Item 5.

South Oroville Drainage Improvements
Project is moving forward with American Engineering. They are focusing their attention on Greenville and the culvert issue there and the right-of-way needed for drainage and street improvements on Elgin and Fort Wayne. Greenville Drainage Plans complete, working on Specification package. Working through property ownership and construction easements on the far West end of Greenville.

Greenville culvert repair will be a priority prior to the next rainy season.

Washington and Table Mountain Complete Streets Project
Project is underway with Mark Thomas. 60% Design was submitted and is currently under review.

Information regarding the project is now posted on the City’s website at City Projects | Oroville, CA.

Tracking for ATP grant application submission in early June 2026. Due date to the State is June 22nd.

Estimated project cost is $65.4M. The ATP grant requires a 20% match, which is $13.7M.

This match can be achieved via CMAQ, local, and/or earmarks. BCAG has stated they will work with us should the need arise.
55 Item 5.

Norton Street Repave Project
Project final design will be submitted in July.

Anticipate award in summer 2026 for completion prior to rainy season.

CalWater is currently relocating water lines prior to construction.

Acacia and Orange
Design for a Roundabout will start in Fall 2026 provided CMAQ funds awarded. Anticipate $1M in CMAQ funding once federally approved.

Lincoln Street/Boulevard Project
Staff will submit an ATP application for Cycle 8 (due June 22nd) for an ATP grant for bike paths, sidewalk closures, and possible roundabouts at Wyandotte and Myers. This project compliments a County complete streets project south of City Limits.

Staff is also pursuing CMAQ funding for feasibility and design activities.

Estimated project cost is $22.5M. The ATP grant requires a 20% match, which is $5.4M.

This match can be achieved via CMAQ, local, and/or earmarks.

We will need to work on setting aside road funds - $3.5M already received.

56 Item 5.
🛣️ Streets and Storm Drain Division
During the month of May Street Department completed a wide range of maintenance, repairs, and support activities across the City. There was an emphasis put on the downtown area for Feather Fiesta Days. We are still down 2 Operators in the month of May. One has since started in June, and one is in background
Some key accomplishments are listed below-
• Patching with hot asphalt in the downtown area in anticipation of a lot of foot traffic during Feather Fiesta Days
• Filled numerous sidewalk imperfections in the downtown area • Responded to multiple 311 service requests for a variety of issues including potholes, flooding, and damaged signs.
• Installed multiple regulatory and warning signs including several anchors and new posts.
• Assisted Code Enforcement with multiple clean ups including one extensive one on Greenville St
• 18 tons of asphalt used to cover about 13,300 square feet of roadway repairs • Numerous potholes filled
• Installed ADA pedestrian ramps on 5th Ave
• Painted numerous crosswalks, directional arrows, and intersections in May • Put in firebreaks with the Cities grader at Argonaut basin, airport, 18th St, Afterbay Estates, Marysville Bagget Rd, and Richter Tract area.
• Began demolition work at new property Oroville Police Dept acquired for a new parking lot

57 Item 5.
58 Item 5.
🌳 Parks & Trees Division
Parks and Trees worked a wide range of tasks for the month of May. The emphasis was on Hewitt Park and Feather Fiesta Days. opening at the beginning of the month and Feather Fiesta days at the end of the month. Parks Staff is averaging 55-60 hours a week at Hewitt Park on a wide range of tasks including opening, cleaning, events/rentals, checking chemicals and maintaining the splashpad, pickleball court maintenance, and other misc tasks. Graffiti and vandalism have been minimal. But the usage is high creating a lot of cleaning in general. We have increased our hours of service throughout the week.

Currently we have coverage 102 hours out of the 168 hours in a week. We are still two Park Technicians down in the Parks and Trees Dept making some operations difficult. We are currently recruiting for those positions.

Some key accomplishments for May are listed below-
• Cleaned parks and green areas 4 days a week.
• Mowed parks and green areas weekly
• Cleaned and weeded Landscape, Lighting, and Assessment Districts. • Trimmed 46 street trees, removed 11 trees.
• Sprayed herbicides throughout parks and green areas
• Checked and made numerous irrigation repairs in parks and green areas • Continued watering street trees 40 hours a week
• Worked a total of 28 events at Hewitt, Hammon, and Rotary Parks • Opened and closed museums.
• Worked with volunteers planting new plants in Sank Park • Worked Feather Fiesta Days
59 Item 5.
💡 Electrical Division
The month of May the electrical department facilitated the routine maintenance on traffic signals and streetlights.
60 Item 5.

Wired in new pumps at Hewitt Park lift station.
61 Item 5.
🚚 Fleet Division
Operations:

In the month of May, the fleet department repaired/serviced 16 Police vehicles - 25 Street/Parks vehicles – 2 Code enforcement vehicles – 4 Sewer vehicles – IT - 1 for a total of 50 .
62 Item 5.
63 Item 5.
64 Item 5.
🚰 Sewer Division
The month of May city sewer crew’s conducted CCTV inspections on 2,449 ft, .46 miles of sewer main. Jet Rod/cleaned 18,177ft, 3.4 miles of sewer main.

Sewer crews replaced both pumps at Hewitt Park lift station due to failure. 65 Item 5.
66 Item 5.

Sewer crews pull pump 1 at Riverview lift station after finding it in failure and remove massive root ball wrapped around pump.
67 Item 5.
68 Item 5.
69 Item 5.

Sewer crew had their annual state required training on the city’s Sewer Emergency Response Plan (SERP). With a mock spill, we covered how we respond and clean up, how we estimate spill volume, and how to fill out a sewer spill report. 70 Item 5.

The sewer division had DUKES ROOT control conduct a root foaming project on 3,355 ft of city sewer main.
71 Item 5.
72 Item 5.
73 Item 5.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: JOSH DODSON, ACCOUNTING MANAGER
RE: PLACEMENT OF SOLID WASTE LIENS ON THE 2026-27 PROPERTY

TAX ROLL
DATE: JULY 07, 2026

SUMMARY
The City Council shall consider the placement of solid waste liens from Recology on the 2026- 27 property tax roll.

DISCUSSION
The City’s Franchise Agreement with Recology and City Ordinance No. 1562 provide that the City must place delinquent garbage bills on the tax roll of property owners.

Recology is required to send two notices prior to turning their delinquent garbage bills over to the City to be placed on the tax roll. The first notice is to the service recipient who may or may not be the property owner as well as the property owner of record. The second notice states that if the payment is not received in fifteen days, a delinquency fee will be added to the bill when the City places the lien on the property.

These procedures are all in accordance with Ordinance No. 1562 and Resolution No. 4486 and 4929. In turning these delinquent tax bills over to the City to be placed on the tax roll of the property owner, Recology has certified that it has complied with all required procedures.

To ensure the proper funding for the refuse removal and disposal service, the City, like many other cities, has a provision for delinquent bills to be placed on the owner’s property tax bill.

The City receives a small fee for each lien placed. $20.00 each to Recology and to the City for a total of $40.00 in fees for each parcel.
74 Item 6.

FISCAL IMPACT
The number of liens is unknown at this time. Prior year was 557 parcels for $11,140.00. $20 of revenue for each parcel placed on the tax roll.

ACTION REQUESTED -
ADOPT RESOLUTION NO. 9467– A RESOLUTION OF THE OROVILLE CITY COUNCIL

ADOPTING DIRECT ASSESSMENT FOR DELINQUENT SOLID WASTE LIENS ON THE 2026-2027 PROPERTY TAX ROLL AND AUTHORIZING THE FINANCE DEPARTMENT TO EXECUTE THE PROPOSITION 218 CERTIFICATION OF TAX BILL LEVY.

ATTACHMENTS
Resolution No. 9467
Lien list
Ordinance 1562
75 Item 6.

CITY OF OROVILLE
RESOLUTION NO. 9467

A RESOLUTION OF THE OROVILLE CITY COUNCIL ADOPTING DIRECT ASSESSMENT FOR DELINQUENT SOLID WASTE LIENS ON THE 2026-2027

PROPERTY TAX ROLL AND AUTHORIZING THE MAYOR TO EXECUTE THE PROPOSITION 218 CERTIFICATION OF TAX BILL LEVY.

WHEREAS, the notices and election for special assessment fees for the purpose of the collection of delinquent garbage bills to Recology to be included on the regular County property tax bill for property owners of the City of Oroville was completed and WHEREAS, the City of Oroville (City) is placing the special assessments on the Butte County secured property tax roll for collection; and WHEREAS, the City has complied with all laws pertaining to the levy of the special assessments, including Proposition 218, to be collected per Health and Safety Code section 5470, et seq; and
WHEREAS, the assessment is being levied without regard to property valuation of the properties involved; and
WHEREAS, the City agrees that it shall be solely liable and responsible, and will defend and hold the County of Butte harmless from any liability as a result of claims or claims for refunds and related interest due filed by taxpayers against any assessments, fees, charges or taxes placed on the roll for the City by the County; and NOW THERFORE BE IT RESOLVED by the Oroville City Council that the list submitted with parcel numbers and amounts are certified as being correct, the Finance Department is hereby authorized to sign any documents required and directed to give the list to the Butte County Auditor on behalf of the City for placement on the secured tax roll for collection.

PASSED AND ADOPTED by the Oroville City Council at a regular meeting held on July 07, 2026, by the following vote:
76 Item 6.

AYES:

NOES:

ABSTAIN:

ABSENT:

David Pittman, Mayor
APPROVED AS TO FORM: ATTEST:
______________________
David Ritchie, City Attorney Kayla Reaster, Assistant City Clerk 77 Item 6.

Parcel Number Lien Bal + Fees
031-070-081-000 4668.94
012-060-003-000 2577.04
035-102-005-000 225.99
035-050-061-000 492.5
035-340-024-000 787.88
035-240-092-000 488.69
035-240-092-000 2898
035-260-084-000 3147.79
012-174-016-000 192.34
012-092-012-000 175.46
035-050-044-000 1219.36
035-050-051-000 1646.96
012-202-003-000 116.8
035-450-003-000 352.94
012-251-001-000 1401.22
012-063-004-000 1041.73
031-161-063-000 338.46
012-129-003-000 113.59
012-129-003-000 274.09
012-129-003-000 113.46
012-129-011-000 112.2
012-129-011-000 76.1
013-160-055-000 337.62
012-160-001-000 2741.02
012-100-047-000 3011.78
031-172-081-000 4776.62
013-041-045-000 116.17
012-152-008-000 484.1
031-120-019-000 136.28
035-145-018-000 165.23
035-260-094-000 3776.69
013-310-043-000 119.65
035-240-015-000 116.17
012-061-004-000 78.4
068-120-036-000 2667.58
013-260-009-000 2008.62
035-500-047-000 2733.46
035-250-085-000 1197.11
033-272-052-000 153.94
012-230-015-000 614.33
031-053-061-000 116.17
012-230-010-000 75.12
012-126-009-000 226.99
035-050-027-000 77.77
031-110-036-000 200.68
031-161-055-000 1025.79
013-160-041-000 200.65
013-160-016-000 220.96
78 Item 6.
012-230-020-000 97.37
033-380-007-000 2741.02
013-160-055-000 547.98
035-050-099-000 163.36
012-240-024-000 263.3
030-260-060-000 906.09
013-170-063-000 3768.34
035-030-051-000 425.78
035-260-009-000 337.18
035-440-003-000 611.01
012-093-016-000 134.31
035-330-013-000 195.14
012-034-016-000 69.01
013-300-016-000 139.24
031-140-130-000 199.64
035-111-008-000 1307.24
033-490-033-000 1129.3
013-310-037-000 2558.05
035-030-093-000 644
035-380-044-000 2741.02
035-050-090-000 3829.11
035-350-006-000 484.1
035-050-079-000 153.53
030-260-061-000 3139.88
035-440-018-000 1490.01
013-250-061-000 211.03
031-140-087-000 1099.18
035-130-078-000 5473.76
012-111-004-000 920.64
035-030-081-000 2033.74
013-250-061-000 438.89
031-161-072-000 1584.7
035-050-107-000 1455.25
035-050-051-000 431.9
033-260-003-000 974.73
910-028-001-000 247.66
012-061-008-000 2200.48
013-300-075-000 1397.2
031-161-054-000 645.28
035-240-021-000 954.62
012-063-012-000 831.49
031-052-028-000 1434.18
035-250-062-000 620.94
013-300-123-000 251.15
013-160-043-000 1344.14
013-160-055-000 476.77
035-260-023-000 97.16
035-360-031-000 974.58
035-360-031-000 222.94
79 Item 6.
035-030-100-000 458.92
013-300-064-000 1723.67
012-010-027-000 3566.56
012-201-010-000 148.93
033-223-010-000 1357.18
012-160-058-000 2098.7
031-053-065-000 6582.22
031-110-044-000 783.32
031-140-081-000 3614.95
033-461-013-000 298.94
068-080-014-000 555.55
033-470-010-000 525.1
012-181-007-000 119.98
031-360-054-000 148.02
031-370-037-000 293.65
068-090-012-000 428.02
033-221-005-000 165.1
035-114-001-000 249.16
035-168-027-000 591.58
031-330-001-000 372.45
031-370-025-000 161.68
031-390-005-000 135.46
031-370-009-000 555.55
035-113-012-000 172.96
035-192-008-000 555.55
031-390-030-000 383.08
035-197-006-000 172.96
033-360-086-000 164.38
012-072-011-000 511.42
013-124-009-000 160
068-221-008-000 540
033-110-026-000 383.08
033-110-061-000 525.1
030-590-004-000 160.67
013-084-013-000 396.28
013-071-021-000 125.1
068-190-089-000 300.49
013-073-009-000 505.55
035-145-005-000 92.76
012-135-034-000 340.36
031-340-029-000 525.1
013-081-020-000 205.1
033-190-037-000 499.8
033-400-009-000 555.55
031-310-008-000 229.42
035-510-025-000 234.02
033-451-002-000 250.68
033-350-015-000 555.55
012-079-010-000 165.1
80 Item 6.
035-143-021-000 135.46
012-126-010-000 555.55
068-170-003-000 264.94
012-113-015-000 405.1
012-131-004-000 169.54
013-021-006-000 525.1
013-092-013-000 757.42
013-130-034-000 525.1
031-340-043-000 211.85
013-190-051-000 560.55
033-470-009-000 555.55
031-150-114-000 452.05
035-095-009-000 555.55
035-145-023-000 285.1
013-081-002-000 525.1
035-098-006-000 116.27
031-390-028-000 163.06
035-172-017-000 388.53
013-093-011-000 94.06
012-201-023-000 400
013-032-011-000 514.29
013-123-006-000 425.1
031-150-077-000 428.02
031-340-038-000 297.43
079-030-025-000 227.6
033-260-048-000 240
031-081-002-000 555.55
035-510-001-000 428.02
068-170-029-000 69.79
035-097-001-000 288.22
068-190-028-000 525.1
031-390-033-000 405.1
030-550-008-000 76.86
035-168-008-000 129
012-072-012-000 270.55
033-272-013-000 555.55
033-400-001-000 144.48
033-430-034-000 525.1
030-550-032-000 169.54
012-181-007-000 416.99
068-080-016-000 259.54
013-042-035-000 525.1
035-181-002-000 164.7
035-115-002-000 95.06
035-123-003-000 537.74
033-332-019-000 562.02
035-101-011-000 555.55
033-293-017-000 171.96
013-041-011-000 555.55
81 Item 6.
013-072-016-000 511.06
068-310-008-000 555.55
035-081-003-000 555.55
035-113-007-000 555.55
033-360-057-000 399.1
012-010-015-000 167.53
068-240-018-000 575.55
035-111-005-000 525.1
030-120-058-000 151.94
035-154-007-000 721.7
035-510-026-000 99.06
012-077-006-000 162.77
035-091-006-000 294.02
035-157-004-000 172.96
031-120-032-000 228.55
068-120-053-000 228.02
079-010-046-000 541.87
013-092-004-000 555.55
033-272-014-000 535.54
078-290-037-000 181.7
035-111-008-000 2037.62
035-096-005-000 246.25
012-142-015-000 172.96
035-071-003-000 86.15
035-104-010-000 555.55
033-242-011-000 541.87
030-490-075-000 167.53
035-197-012-000 293.65
079-030-008-000 428.02
035-520-002-000 410.23
035-102-012-000 541.6
013-063-026-000 156.52
035-071-003-000 119.65
012-135-005-000 285.1
030-490-090-000 171.96
033-490-024-000 164.11
012-129-010-000 254.17
030-580-008-000 167.02
033-180-003-000 85.1
012-082-005-000 319.23
013-028-008-000 255.55
033-410-011-000 570.55
012-066-011-000 555.55
012-121-006-000 993.35
013-092-015-000 355.55
033-452-005-000 143.52
012-172-016-000 428.02
012-026-013-000 92.77
035-192-007-000 525.1
82 Item 6.
013-021-006-000 165.1
035-141-014-000 172.96
013-042-029-000 555.55
030-490-022-000 240.6
031-053-044-000 128.02
013-121-022-000 621.66
035-157-022-000 295.06
012-081-030-000 337.22
033-430-012-000 169.54
013-130-011-000 531.84
033-461-004-000 525.1
031-130-007-000 117.68
035-145-018-000 104.81
035-141-004-000 166.53
012-061-004-000 525.1
035-172-012-000 555.55
068-110-015-000 325.1
031-051-051-000 555.55
033-452-016-000 1131.06
033-430-033-000 417.52
033-482-010-000 83.08
068-300-013-000 172.96
068-040-057-000 555.55
012-203-009-000 1172.42
013-071-002-000 83.74
033-430-018-000 495.81
033-440-012-000 555.55
013-061-002-000 428.02
031-140-057-000 555.55
033-470-021-000 310.49
035-168-019-000 165.1
033-293-009-000 244.84
012-133-013-000 189.95
031-084-010-000 560.55
012-131-004-000 288.76
031-390-035-000 525.1
012-124-007-000 307.41
068-300-011-000 526.88
012-113-014-000 93.85
035-112-014-000 124.78
033-243-005-000 555.55
031-370-027-000 555.55
035-145-002-000 555.55
035-073-011-000 555.55
068-300-082-000 335.46
035-157-004-000 555.55
012-066-009-000 555.55
013-026-003-000 555.55
013-026-001-000 1098.79
83 Item 6.
031-140-022-000 912.1
012-066-010-000 912.1
031-081-012-000 392.33
035-104-007-000 131.59
012-066-003-000 293.65
035-197-003-000 410.23
035-510-054-000 555.55
031-370-024-000 330.55
012-253-005-000 161.68
068-190-086-000 555.55
013-061-019-000 555.55
033-332-018-000 564.25
031-081-007-000 555.55
035-111-010-000 555.55
079-020-022-000 172.08
013-010-024-000 541.6
035-510-070-000 555.55
033-310-010-000 266.8
033-462-049-000 172.96
012-240-026-000 555.55
035-164-012-000 525.1
030-120-061-000 388.27
012-254-002-000 609.24
035-182-015-000 541.6
013-033-001-000 278.02
068-060-005-000 540.03
035-169-005-000 230.46
035-158-002-000 555.55
035-520-046-000 75.5
013-121-010-000 318.64
035-155-008-000 410.23
033-440-004-000 555.55
035-143-027-000 551.84
012-201-026-000 683.08
031-150-031-000 161.26
035-073-023-000 172.96
012-133-025-000 227.05
079-020-029-000 105.55
030-490-078-000 305.55
035-165-004-000 555.55
031-150-109-000 180.55
012-181-007-000 555.55
012-253-018-000 555.55
035-172-005-000 525.1
012-025-006-000 170.24
035-520-017-000 228.84
068-060-001-000 160
035-520-034-000 160
013-280-039-000 75.1
84 Item 6.
910-023-356-000 88.16
035-167-014-000 446.1
012-123-001-000 297.43
068-190-013-000 555.55
031-360-050-000 161.68
031-340-040-000 172.96
031-081-024-000 251.84
031-084-003-000 355.55
035-071-003-000 466.45
030-490-056-000 555.55
033-462-038-000 217.76
035-153-002-000 365.04
035-153-002-000 578.85
035-182-006-000 220
035-083-015-000 555.55
033-222-014-000 139.02
013-073-011-000 130.8
033-332-012-000 268.55
013-071-006-000 396.28
030-490-037-000 525.1
012-065-003-000 195.53
030-490-001-000 415.55
035-071-021-000 305.55
013-033-015-000 555.55
013-093-017-000 555.55
035-155-013-000 269.48
035-193-014-000 555.55
031-081-014-000 555.55
030-550-004-000 555.55
031-310-012-000 172.96
012-141-015-000 165.1
012-141-015-000 165.1
033-234-009-000 1104.04
031-140-061-000 683.69
035-083-017-000 555.55
035-520-050-000 555.55
013-031-007-000 171.55
033-350-023-000 525.1
068-300-044-000 160
035-081-004-000 332.1
033-370-015-000 428.02
013-072-004-000 555.55
013-092-005-000 155.55
012-254-009-000 380.37
035-158-001-000 300.49
013-061-006-000 555.55
031-051-013-000 555.55
033-260-030-000 555.55
079-030-032-000 300.49
85 Item 6.
013-072-006-000 165.1
033-302-004-000 190.44
033-440-005-000 525.1
068-090-010-000 205.69
035-197-004-000 555.55
031-085-007-000 110.71
012-066-007-000 555.55
031-161-031-000 555.55
035-155-016-000 555.55
035-161-015-000 555.55
035-510-051-000 464.6
035-143-020-000 138.7
035-105-003-000 212.33
079-030-071-000 555.55
035-113-019-000 452.46
035-103-005-000 279.1
079-030-054-000 412.73
033-350-001-000 555.55
031-300-004-000 442.99
012-133-021-000 140
035-520-071-000 285.1
079-030-024-000 209.93
031-360-048-000 288.16
012-172-015-000 165.1
031-081-013-000 208.64
013-042-017-000 135.1
013-063-015-000 65.66
012-026-009-000 525.1
079-020-071-000 65.55
033-200-014-000 405.1
035-071-020-000 555.55
012-222-010-000 165
035-162-006-000 525.1
031-340-011-000 410.23
035-510-019-000 300.49
033-320-011-000 598.05
035-083-013-000 301.19
031-350-006-000 455.55
035-520-037-000 555.55
031-086-020-000 165.1
035-500-035-000 404.11
013-021-008-000 428.02
012-201-019-000 417.52
031-140-095-000 428.02
031-340-030-000 172.96
033-200-003-000 1026.97
012-127-003-000 428.02
035-510-065-000 518.98
033-232-011-000 155.4
86 Item 6.
012-025-014-000 299.55
033-221-009-000 105.55
031-150-093-000 525.1
030-580-016-000 318.64
013-071-033-000 525.1
035-520-019-000 159.47
012-144-015-000 601.58
031-150-044-000 275.1
031-086-007-000 297.43
030-590-025-000 75.1
013-081-009-000 100.49
035-114-025-000 549.43
012-144-021-000 301.98
031-150-034-000 135.46
012-252-006-000 163.63
035-071-029-000 355.55
035-073-006-000 419.49
012-064-002-000 229.42
079-010-039-000 358.05
013-072-027-000 440
035-105-002-000 287.28
035-104-004-000 134.92
033-480-023-000 555.55
035-114-019-000 555.55
035-193-014-000 142.48
031-082-008-000 505.55
012-151-001-000 158.47
012-124-007-000 153.43
035-173-009-000 172.96
033-360-056-000 525.1
068-050-023-000 555.55
035-114-022-000 555.55
068-300-002-000 172.96
033-242-017-000 355.55
031-380-010-000 555.55
012-124-006-000 270.1
033-233-032-000 555.55
035-112-013-000 196.1
012-075-005-000 525.1
012-129-001-000 227.05
033-452-014-000 555.55
012-201-027-000 295.06
079-020-032-000 559.1
035-071-009-000 555.55
068-310-009-000 511.06
068-300-061-000 511.06
035-152-002-000 428.02
031-310-003-000 525.1
031-130-056-000 419.36
87 Item 6.
013-072-008-000 297.83
033-490-034-000 925.12
031-340-049-000 560.55
035-510-026-000 239.87
031-081-016-000 235.52
035-193-004-000 529.46
035-167-022-000 300.55
035-152-006-000 325.1
035-123-015-000 305.55
012-133-003-000 286.79
012-113-002-000 555.55
030-490-096-000 525.1
033-452-031-000 330.93
035-520-063-000 300.49
035-095-008-000 377.26
035-156-015-000 255.55
031-140-053-000 555.55
012-254-002-000 525.1
068-190-074-000 328.02
035-510-031-000 161.68
033-190-030-000 555.55
013-121-001-000 555.55
068-330-003-000 293.44
012-084-011-000 396.28
033-430-037-000 555.55
031-140-094-000 525.1
079-030-044-000 172.96
031-020-020-000 555.55
012-010-025-000 183.37
068-330-001-000 394.84
033-480-029-000 160.55
013-032-009-000 175.44
013-130-012-000 424.48
035-111-014-000 525.1
035-163-004-000 140.1
033-440-028-000 204.6
012-190-005-000 314.05
012-022-008-000 136.83
079-030-040-000 205.55
033-452-012-000 394.84
035-520-009-000 240
035-168-026-000 110.1
035-182-019-000 430.55
012-181-012-000 132.04
012-201-028-000 220.45
035-192-011-000 169.54
031-081-023-000 97.65
031-370-038-000 549.43
068-100-012-000 285.1
88 Item 6.
068-100-012-000 215.82
013-026-005-000 525.1
035-510-072-000 555.55
012-010-012-000 324.14
012-222-017-000 65.76
012-251-030-000 410.23
035-146-018-000 135.46
035-165-001-000 659.64
031-340-007-000 555.55
012-174-002-000 387.65
012-061-024-000 215
031-083-006-000 541.6
030-580-041-000 67.89
035-193-006-000 505.23
033-232-008-000 309.68
031-150-037-000 555.55
035-500-040-000 1057.42
035-500-041-000 525.1
030-490-025-000 165.1
035-115-001-000 555.55
033-440-021-000 205.1
033-231-008-000 555.55
030-590-016-000 429.02
035-101-016-000 555.55
013-190-025-000 555.55
031-300-003-000 165.1
035-162-006-000 525.1
033-271-029-000 280
035-520-059-000 286.88
030-590-028-000 423.43
013-042-008-000 525.1
012-133-008-000 531.84
035-520-060-000 195.2
033-310-004-000 101.68
035-111-016-000 525.1
035-500-029-000 543.99
031-310-046-000 555.55
031-150-099-000 165.1
068-180-033-000 428.02
068-223-009-000 400.76
035-145-018-000 151.87
033-452-002-000 555.55
013-042-035-000 555.55
035-510-073-000 504.14
012-160-066-000 140.55
033-453-003-000 518.98
031-150-116-000 172.96
035-153-015-000 555.55
030-490-085-000 105.55
89 Item 6.
030-490-026-000 525.1
013-082-005-000 172.96
033-453-032-000 178.79
079-030-080-000 127.44
035-097-003-000 201.26
033-462-027-000 455.55
012-122-012-000 177.92
078-170-048-000 217.76
033-462-004-000 555.55
033-410-014-000 558.05
013-063-018-000 555.55
033-210-026-000 525.1
033-234-011-000 154.1
012-064-005-000 555.55
012-125-008-000 235.1
033-340-021-000 475.1
035-146-002-000 330.29
012-251-002-000 555.55
035-104-007-000 500.08
031-340-046-000 525.1
012-181-012-000 449.73
035-143-036-000 360.55
031-084-007-000 555.55
035-113-017-000 555.55
035-157-010-000 172.96
035-105-004-000 511.42
035-157-019-000 90.82
033-310-001-000 405.55
013-063-020-000 389.95
068-370-014-000 300.09
031-340-051-000 555.55
068-222-015-000 555.55
033-462-007-000 555.55
033-453-022-000 166.1
031-310-034-000 285.1
033-440-023-000 225.29
033-242-009-000 94.94
033-222-037-000 480.33
035-173-007-000 70.02
035-500-008-000 428.02
031-380-025-000 240
035-181-002-000 396.13
033-200-001-000 364.45
031-340-010-000 555.55
068-160-073-000 415.55
012-290-010-000 172.96
033-234-008-000 555.55
035-098-014-000 525.1
012-123-006-000 229.43
90 Item 6.
012-026-015-000 555.55
012-027-001-000 555.55
068-223-015-000 172.96
031-380-030-000 405.78
035-168-027-000 576.57
033-360-027-000 70.65
068-300-031-000 229.7
035-074-016-000 668.58
012-127-002-000 268.47
033-180-014-000 164.1
068-110-010-000 555.55
035-102-016-000 135.46
012-062-009-000 265.55
033-260-002-000 410.23
035-115-010-000 560.55
035-102-018-000 348.28
012-201-022-000 88.02
035-520-040-000 555.55
033-462-032-000 428.02
013-121-011-000 555.55
012-182-010-000 196.78
031-085-016-000 856.22
030-580-013-000 285.1
068-170-041-000 555.55
030-490-018-000 285.1
033-440-002-000 555.55
035-182-017-000 154.06
035-123-005-000 525.1
035-197-005-000 285.1
035-111-020-000 206.91
079-010-012-000 410.23
035-510-010-000 280
031-140-099-000 555.55
012-145-006-000 250.54
035-081-003-000 340.03
035-192-002-000 555.55
035-071-003-000 170.2
035-096-005-000 216.6
012-135-003-000 428.02
068-080-001-000 305.1
035-143-028-000 255.55
031-320-016-000 511.06
035-166-003-000 408.79
030-490-095-000 555.55
012-064-008-000 541.6
012-131-003-000 79.1
013-124-001-000 274.94
078-290-008-000 555.55
031-310-014-000 160
91 Item 6.
012-079-011-000 210.23
031-330-003-000 530.2
035-071-033-000 410.23
033-150-010-000 541.6
013-083-002-000 172.96
079-030-006-000 175.46
012-073-001-000 507.46
035-181-021-000 163.99
013-071-034-000 161.68
033-453-026-000 165.1
068-160-083-000 165.1
013-083-003-000 166.08
033-243-002-000 928.69
013-190-037-000 555.55
035-510-050-000 555.55
035-106-005-000 326.24
033-110-063-000 169.54
013-041-017-000 118.28
012-252-005-000 555.55
012-251-017-000 793.47
013-028-007-000 555.55
031-390-034-000 300.49
035-157-014-000 555.55
030-580-025-000 293.65
035-123-013-000 197.55
031-140-103-000 549.43
013-071-005-000 521.1
035-074-020-000 204.43
035-520-014-000 486.56
035-091-012-000 549.43
033-320-001-000 405.1
035-340-043-000 122.96
033-462-055-000 172.96
035-181-016-000 396.55
035-143-005-000 165.1
030-580-018-000 200.55
078-290-008-000 555.55
035-091-008-000 555.55
035-114-013-000 555.55
033-490-024-000 186.89
035-500-037-000 199.55
033-360-062-000 555.55
013-091-011-000 422.55
013-051-008-000 525.1
013-084-010-000 555.55
035-145-009-000 555.55
031-086-005-000 555.55
068-110-009-000 555.55
012-202-015-000 325.1
92 Item 6.
033-320-007-000 247.73
035-510-033-000 78.02
012-078-003-000 122.96
035-105-001-000 299.14
068-280-023-000 168.1
035-113-004-000 565.55
012-134-001-000 92.91
035-062-007-000 355.98
035-510-074-000 555.55
013-031-006-000 555.55
033-272-047-000 275.53
035-168-002-000 131.25
033-480-016-000 555.55
012-202-013-000 555.55
068-110-018-000 333.23
031-310-052-000 172.96
012-253-017-000 555.55
068-300-079-000 555.55
031-320-005-000 85.1
013-130-048-000 127.54
079-030-012-000 125.55
035-099-006-000 525.1
068-320-044-000 170.49
012-141-012-000 555.55
031-150-078-000 285.1
031-150-078-000 165.1
079-020-027-000 135.46
031-053-097-000 555.55
031-084-005-000 372.58
068-190-026-000 525.1
031-390-002-000 172.96
035-095-004-000 555.55
031-081-012-000 220.21
012-160-057-000 525.1
012-126-003-000 225.23
012-135-011-000 80.14
031-140-018-000 555.55
035-520-067-000 549.43
035-122-006-000 66.91
030-590-020-000 293.02
079-020-039-000 435.76
033-420-008-000 400
068-170-018-000 393.84
012-181-001-000 1057.42
033-233-030-000 555.55
031-051-068-000 555.55
013-122-007-000 592.92
035-141-020-000 555.55
031-140-023-000 555.55
93 Item 6.
033-462-048-000 240
012-201-009-000 172.96
033-360-071-000 72.22
012-181-002-000 281.63
030-490-094-000 555.55
035-161-007-000 172.96
033-222-002-000 227.55
012-079-005-000 761.11
035-164-006-000 100.49
078-290-052-000 565.86
035-113-009-000 1107.42
013-051-002-000 293.44
035-182-020-000 162.55
012-221-012-000 525.1
068-190-083-000 405.55
013-190-050-000 291.14
035-141-015-000 410.23
035-084-004-000 172.96
030-490-103-000 305.55
035-095-013-000 293.65
033-231-001-000 248.43
033-430-026-000 228.02
031-081-010-000 555.55
013-025-010-000 132.69
031-340-047-000 311.31
035-168-028-000 301.02
035-156-013-000 410.23
035-156-013-000 410.23
012-183-004-000 424.43
035-081-005-000 280
030-590-026-000 68.81
031-340-033-000 555.55
033-331-004-000 422.47
035-500-021-000 165.1
012-121-002-000 118.98
012-133-024-000 241.05
079-010-050-000 555.55
013-190-052-000 298
013-053-005-000 140.55
012-062-003-000 358.84
012-125-006-000 135.83
035-143-037-000 428.02
012-202-019-000 285.1
031-320-011-000 171.43
068-190-017-000 555.55
035-520-070-000 555.55
035-082-022-000 396.28
079-040-035-000 428.02
031-053-062-000 1544.44
94 Item 6.
013-091-007-000 555.55
035-095-007-000 1213.96
031-320-006-000 384.52
035-520-059-000 540.22
033-452-032-000 165.1
035-193-001-000 198.27
035-193-001-000 364.45
035-169-002-000 165.1
035-168-021-000 400.55
012-182-009-000 70.53
030-590-050-000 490.1
033-243-013-000 570.48
031-150-100-000 255.1
012-064-005-000 240
031-081-005-000 127.23
031-053-003-000 169.54
012-254-008-000 410.23
035-074-019-000 428.02
013-051-012-000 518.98
031-083-007-000 555.55
033-233-028-000 555.55
013-032-012-000 525.1
013-022-005-000 172.96
030-550-003-000 172.96
035-510-024-000 525.1
013-300-003-000 142.32
035-510-085-000 331.84
012-253-005-000 194.65
031-081-017-000 541.6
035-146-012-000 449.03
033-222-005-000 165.1
068-190-021-000 410.23
012-133-023-000 133.74
012-182-008-000 135.46
030-490-084-000 169.36
013-063-017-000 225.1
035-074-014-000 525.1
068-190-061-000 518.98
031-330-001-000 85.1
035-510-042-000 179.96
068-110-027-000 555.55
035-141-006-000 279.1
013-093-005-000 555.55
033-451-001-000 555.55
079-020-021-000 456.22
033-440-014-000 136.78
035-146-007-000 410.43
012-010-016-000 425.1
033-452-007-000 555.55
95 Item 6.
031-172-007-000 422.73
035-094-010-000 625.95
013-122-006-000 255.82
035-121-008-000 410.23
013-190-011-000 245.55
035-122-009-000 275.1
012-182-011-000 410.23
012-131-010-000 553.42
012-025-002-000 308.14
033-222-034-000 165.1
033-440-030-000 303.55
079-010-036-000 109.65
033-490-023-000 111.11
012-128-008-000 295.2
031-140-091-000 288.22
033-320-030-000 300.49
035-172-015-000 525.1
012-160-042-000 645.63
030-490-100-000 303.64
030-580-053-000 325.1
030-590-040-000 555.55
031-400-024-000 555.55
035-182-016-000 132.04
035-143-009-000 181.92
012-181-007-000 169.54
96 Item 6.
1 CITY OF OROVILLE
2 ORDINANCE NO. 1562
3 4 AN ORDINANCE AMENDING CHAPTER 11 OF THE OROVILLE CITY CODE

RELATING TO SOLID WASTE DISPOSAL
5 6 WHEREAS, The periodic collection of refuse and sweeping of streets from all places in the City benefits all occupants of 7 places and premises in the City and promotes the health, safety and welfare of all residents of the City; and
8 WHEREAS, No provision herein contained shall be construed to 9 conflict with any provision of the Integrated Waste Management Act, the Medical Waste Management Act, or any other state law. In the 10 event such a conflict exists, or shall exist in the future., Istate law shall be controlling.
11 NOW, THEREFORE, the Council of the City of Oroville do ordain 12 as follows:
13 SECTION 1: Section 11- 15 and 11- 16 are hereby added to the Oroville City Code to read as follows:
14 Sec. 11- 15. Collection - Contract - Contents 1
15 A. For the collection and disposal of refuse, garbage 16 and rubbish ( collectively " waste") and for street sweeping, a contract or contracts for a period not to exceed twenty- five 17 25) years may be entered into by the City in accordance with and subject to the terms and conditions of this Article. 18 B. The contract shall provide that the contractor' shall 19 collect and dispose of the refuse, garbage and rubbish and/ or provide street sweeping in the City in the manner as provided 20 in this Article, and shall not charge any ' amounts in excess of the rates specified in the Resolution adopted pursuant to 21 sec. 11- 4 . The contractor shall be required to furnish a cash surety bond to the City in the penal sum of Fifty Thousand 22 Dollars ($ 50, 000. 00) conditioned upon the faithful performance of the contract and the provisions of this Article.: Such 23 contractor shall have the sole and exclusive right, except as in this Article otherwise provided, to collect all refuse, 24 garbage and rubbish and/ or to provide street sweeping in that part of the City as in the contract provided, and transport 25 the same through the streets and public ways of the City. The contract shall also require that the contractor procure for 26 the period covered by the proposed contract, full compensation insurance in accordance with the Workers ' Compensation 27 Insurance and Safety provisions of the Labor Code of the State of California. Such contract shall also require that the 28 contractor carry public liability insurance to the extent of 1 97
Item 6.
1 One Million Dollars ($ 1, 000, 000. 00) for the death of or injury to one person, Two Million dollars ($ 2 , 000, 000. 00) for the 2 death of or injury to more than one person, and property damage insurance to the extent of One Hundred Thousand Dollars 3 100, 000. 00) upon each of the trucks or other vehicles used by the contractor in carrying out of the work called for in 4 the contract. The City Council, by Resolution, shall have the power to provide for the inclusion in such contact of such 5 terms as it deems necessary to protect the interests of the City.
6 Section 11- 16. Billing Charges to be a Lien
7 a) All billing for waste collection and/ or street sweeping 8 shall be made by the contractor; all charges shall become delinquent ninety ( 90) days after billing date.
9 b) If the bill remains unpaid after the date of delinquency, 10 the contractor shall be entitled to a
delinquency. fee.

However, said delinquency fee shall not be assessed until 11 fifteen ( 15) days after notification of the delinquency to the owner and recipient of service. The form and content of the 12 delinquency notice sent by the contractor shall be approved by the Fire Chief. The contractor shall simultaneously file 13 with the Fire Chief a formal written notice stating the Assessor' s Parcel Number of the parcel to which service was 14 rendered, that such delinquency notice has been sent to such recipient and owner and the date and address to which notice 15 was sent. Delinquency fees shall be set by Resolution of the City Council.
16 c) Should the bill remain unpaid at the expiration of the 17 fifteen ( 15) days, the contractor may assign said bill to the City for lien proceedings.
18 d) Upon the City' s receipt of the assignment from the 19 contractor and at the convenience of the City ( i. e. , once per year during the month of May) ; the Fire Chief shall initiate 20 proceedings complying with Government Code sections 38790. 1 and 25831 to create a lien on the real property to which the 21 waste collection and/ or street sweeping has been rendered. 22 e) The lien will be officially recorded in the Butte County Recorder' s office. The lien may carry such additional
23 administrative charges as set forth by Resolution of the Oroville City Council . The owner shall be notified by the City 24 Finance Department that the delinquency charges and
administrative charges are due the City and that said lien has 25 been recorded. "
26 SECTION 2 : If any section, subsection, phrase or clause of this Ordinance is for any reason held to be
27 unconstitutional, such decision shall not affect the validity of the remaining portions of this
28 Ordinance. The City Council hereby declares that it
2 98
Item 6.
1 would have passed this ordinance and each section,
subsection, phrase or clause thereof irrespective
2 of the fact that any one or more sections,
subsections, phrases or clauses be declared
3 unconstitutional .
4 SECTION 3 : The City Clerk shall attest to the adoption of this Ordinance and cause same to be published in the
5 manner required by the Charter.
6 PASSED AND ADOPTED by the Oroville City Council
7 at a meeting of August 3 , 1993 by the following vote:
8 AYES: Geddis , Ginter, ROssas , Stevens , Wilson, Thomas, Diver 9 NOES: None
10 ABSTAIN: None
11 ABSENT: None
12 13
14 Mayor
15 ATTEST:
16 17 City Clerk
APPR VED AS TO FORM*
18 19 at,"/ -
20 City Attorney
21 22
23 24
25 26
27 28
3 99
Item 6.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: TIM KABER; DIRECTOR OF PUBLIC WORKS
CODY NISSEN; AIRPORT MANAGER
RE: UPDATE ON AIRPORT AND FBO OPERATIONS
DATE: JULY 7, 2026

SUMMARY
The City Council shall receive a brief update from the Airport Manager and FBO Operator on operations from FY 2025 / 2026.

DISCUSSION
None.

FISCAL IMPACT
None.

ACTION REQUESTED -
ACCEPT FOR INFORMATION.

ATTACHMENTS
Power Point Presentation
100
Item 7.

Cody Nissen
Airport Manager
Oroville Municipal Airport Update
101
Item 7.
102
Item 7.
•884 sales (736 Aviation Gasoline (AVGas) / 148 JetA)
•27,697 gal. (17,213g AVGas / 15,129g JetA)
•$198,663 gross sales
•2484 Flight OPS (w/ ADS-B tracking)
103
Item 7.
•1071 sales (892 Aviation Gasoline (AVGas) / 179 JetA)
•36,013 gal. (20,338g AVGas / 15,674g JetA)
•$221,096 gross sales
104
Item 7.
•Butte County Weights and Measures (fuel pump
dispenser accuracy)
•Cal Trans Division of Aeronautics inspection; Full
comprehensive inspection of airfield, pavement,
lighting, visual aids etc..
•Overall fuel system inspection (World Fuels)
105
Item 7.
•Runway 13/31 Marking Upgrades to current FAA Standards •Crack Seal Project North and South Parking Ramps including concrete around FBO
•Crack Seal Project Taxiway L and Taxi-lanes adjacent to Taxiway J • Full Remark of all areas Crack Sealed including ADA Parking Areas • Full Overlay of FBO Roof
106
Item 7.

Runway 13/31 Marking Upgrades
107
Item 7.
108
Item 7.
109
Item 7.
110
Item 7.
111
Item 7.
•Runway 02/20 rehabilitation project
•Runway 02/20 lighting system upgrade
•Cross Taxiways A,B, C, and E rehabilitation
•Runway 2 Blast Pad
•Runway 20 Blast Pad
•Updating CatEx environmental docs
•Updating ACIP (Airport Capital
Improvement Program)
112
Item 7.
• Coordinated effort with City Public Works to crack seal Butte County Mosquito Vector Control District
taxiway
113
Item 7.
• 2027 Runway 02/20 and lighting rehab design
• 2028 Design of Taxiway S Realignment (golf course taxiway) TBD by the FAA
• 2029 Construction – Runway 02/20 and lighting full rehabilitation • 2030 Construction – Cross Taxiways A, B, C, E, Blast Pads for runways 02 and 20
• 2031 Design/Construct major crack seal project runway 13/31, Butte County Mosquito Vector Control District Taxiway, Taxiway S Apron (golf course aircraft parking)
114
Item 7.
• EVTOL / AAM (Electric Vertical Takeoff & Landing /
Advanced Air Mobility) infrastructure
115
Item 7.
116
Item 7.
117
Item 7.
• Monday to Wednesday: 9:00am to 5:00pm
• Thursday: 6:00am to 11:00am
• Friday and Saturday: 9:00am to 5:00pm
*Shop hours vary during Ag season
118
Item 7.
•Helicopter component overhaul, including
transmissions, tail gear assemblies, masts,
swashplates etc.
•Helicopter Track and Balance
•Helicopter Weight and Balance
•Aircraft annual inspections
119
Item 7.
• Support for nighttime medical flight operations
•Coordination of catering services for long flights
120
Item 7.
•2 Helicopter transmission complete overhauls (minimum
100 hours each to complete)
•4 Swashplate assemblies overhauled
•4 Scissor and Sleeve assemblies
•7 Tail rotor drive gear assemblies
•2 main rotor fitting changes
•3 Mast assembly overhauls
121
Item 7.
• 2 Off site weight and balance adjustments
• 4 Track and Balance adjustments
• 2 Fixed wing aircraft annual inspections
• 1 Fixed wing propeller change
• 2 Tire repairs / tube replacements
• 3 Jump starts / dead battery issues
• Out-of-area Flight School challenges / concerns
122
Item 7.
123
Item 7.
124
Item 7.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: PAT PIATT, COMMUNITY DEVELOPMENT DIRECTOR

WES ERVIN, CITY PLANNER
RE: OPPORTUNITY ZONE 2.0 RECOMMENDATION TO NOMINATE CENSUS TRACTS 28, 30-1, 30-2, 32, 37, & 25 FOR FEDERAL DESIGNATION DATE: JULY 7, 2026

SUMMARY
The City Council shall consider approving an application recommending eligible census tracts for Opportunity Zone 2.0 (OZ 2.0) Designation.

DISCUSSION
The Opportunity Zones program was originally established in 2017 to implement the Federal Tax Incentive. At that time, nine census tracts in Butte County were designated as Opportunity Zones. In July of 2025, as part of the Big Beautiful Bill of 2025, Opportunity Zones 2.0 (OZ 2.0) was signed into federal law, permanently renewing and enhancing the tax incentive program.

OZ 2.0 can support private investments such as commercial and industrial real estate, housing, infrastructure, and existing and start-up businesses. Corporations and individuals with realized capital gains may be eligible to invest and get credits on investments held for 5 years or more.

Each community has the opportunity to nominate census tracts where the incentive has the best chance to encourage investment. Eligible tracts must have a Median Household Income under 70% of the statewide average and/or a poverty rate over 20%. Of about 6,500 eligible tracts in California, only about 1,600 (25% of those eligible) can ultimately be approved, so it is a competitive process.

On June 15, 2026, the Governor's Office of Business and Economic Development began accepting recommendations for OZ 2.0 designation. Local authorities, including cities and counties, may submit eligible census tracts to the State by July 23, 2026. The Governor will then decide which tracts to forward for actual Federal designation. New designations will take effect for investments made on or after January 1, 2027, and the nomination process will operate on a rolling 10-year basis.

Under OZ 2.0, there are approximately twenty likely eligible census tracts within Butte County, most of which are within incorporated jurisdictions. All nine tracts currently designated within the county are likely eligible for nomination again.
125
Item 8.

Applications will be evaluated on several criteria, including: 1) advancing the Jobs First program; 2) attracting affordable housing; 3) have shovel ready sites; and 4) whether public investment is planned or demonstrated. Staff believes there is a strong case for the tracts in and around Oroville.

In the Oroville area, staff recommends the Council approve recommending the following tracts -- in priority order:

1. Tracts 28, 30-1 & 30-2 –which includes Downtown, Koppers, the proposed Lincoln Ophir annexation area, and South Oroville. These tracts are designated as rural, which has a greater investment incentive.
o This is identical to our existing OZ 1.0, which will be in effect until December 31, 2028, even if not redesignated. If redesignated, it will be in effect until December 31, 2037.

2. Tract 32 -- southern industrial area including our approved warehouse project area.

Development there is actively being discussed.

3. Tract 37 -- Airport and vicinity. The Linemen’s College and others are investing there.

The Airport Business Park is also included.

4. Tract 25 -- which includes the potential Hmong Temple and community on North Table Mountain Blvd.

If Council approves, staff will request a letter of support from Butte County, who will also benefit since Tracts 32, 37, and 25 straddle both jurisdictions.

For more information see the Federal and State OZ web sites:
https://home.treasury.gov/policy-issues/tax-policy/data-transparency/qualified-opportunityzones https://business.ca.gov/resources/infrastructure-development/opportunity-zones-in-california/

FISCAL IMPACT
.None. Only staff time.

ACTION(S) REQUESTED -

1. APPROVE AN APPLICATION RECOMMENDING CENSUS TRACTS 28, 30-1, 30-2, 32, 37, AND 25 FOR DESIGNATION; AND

2. ADOPT RESOLUTION NO. 9468 - A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF OROVILLE AUTHORIZING THE NOMINATION OF ELIGIBLE CENSUS TRACTS FOR OPPORTUNITY ZONE 2.0 DESIGNATION AND AUTHORIZING CITY LEADERSHIP TO EXECUTE ALL NECESSARY SUBMISSIONS.

ATTACHMENTS

1. OZ 1.0 map and OZ 2.0 Eligible areas

2. Resolution No. 9468
126
Item 8.

1.0 1.0

1.0 127
Item 8.
128
Item 8.
129
Item 8.
130
Item 8.
131
Item 8.
132
Item 8.
133
Item 8.

Page 1 of 2 ends

CITY OF OROVILLE
RESOLUTION NO. 9468

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OROVILLE AUTHORIZING THE NOMINATION OF ELIGIBLE CENSUS TRACTS FOR OPPORTUNITY ZONE 2.0

DESIGNATION AND AUTHORIZING CITY LEADERSHIP TO EXECUTE ALL NECESSARY SUBMISSIONS.

WHEREAS, the federal Opportunity Zones 2.0 program, enacted under Public Law 119-21, permanently establishes and updates the tax incentives and eligibility criteria under the Internal Revenue Code to encourage long-term private equity investments in distressed communities; and
WHEREAS, community areas qualify for designation if they represent low-income census tracts certified by the U.S. Department of the Treasury, carrying poverty rates of at least 20 percent or a median family income not exceeding 70 percent of the state median; and
WHEREAS, the California Governor's Office allows local municipalities, counties, and tribal governments to submit a Local Authority Recommendation Form to nominate specific eligible tracts; and
WHEREAS, Butte County Census Tracts 28, 30-1, 30-2, 32, 37, and 25 fall entirely or partially within the jurisdictional boundaries of the City of Oroville and strictly meet all federal eligibility rules; and
WHEREAS, securing an Opportunity Zone designation will foster local economic growth, stimulate private investment in vacant or underutilized properties, increase affordable housing options, and generate high-quality jobs;

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OROVILLE THAT:

Section 1. The City Council hereby supports and formally approves the nomination of Census Tracts 28, 30-1, 30-2, 32, 37, and 25 for federal Opportunity Zone 2.0 designation.

Section 2. The Mayor, City Manager, City Clerk, and designated city economic development staff are authorized to execute and submit the official Local Authority Recommendation Form to the state nomination authority prior to the closing deadline.

Section 3. City leadership is authorized to procure necessary professional services, compile geographic and demographic data, and take all reasonable subsequent actions required to achieve and leverage these designations.

Section 4. This Resolution shall take effect immediately upon its passage and adoption.

Section 5. The City Clerk shall attest to the adoption of this Resolution. 134
Item 8.

Page 2 of 2 ends

PASSED AND ADOPTED by the City Council of the City of Oroville at a regular meeting on July 7, 2026, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

David Pittman, Mayor
APPROVED AS TO FORM: ATTEST:

David Ritchie, City Attorney Kayla Reaster, Assistant City Clerk 135
Item 8.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN AND COUNCIL MEMBERS
FROM: TIM KABER – DIRECTOR OF PUBLIC WORKS
RE: CONTRACT WITH UNITED BUILDING CONTRACTORS, INC. FOR THE

PIONEER MUSEUM ROOF AND HVAC REPAIR PROJECTS
DATE: JULY 7, 2026

SUMMARY
The City Council shall consider awarding a Construction Contract (Agreement No. 3590) to United Building Contractors, Inc of Chico for construction of repairs to the roof and HVAC system for the Pioneer Museum.

DISCUSSION
Staff sought proposals from CUPCCAA contractors in June of 2025 for roof repairs and HVAC replacement at the Pioneer Museum. Two bids were received.

The project stalled due to staff turnover and budget constraints. In March 2026 staff learned about a donor for the project, the Betty Boyle Davis Trust. Staff went back to the two bidders that submitted proposals to reconfirm the project price. After proposal resubmittal, UBC, Inc is the apparent low bidder.

The project costs will be reimbursed to the City by the Betty Boyle Davis Trust. Staff met with the Trust executor to discuss payment mechanisms, and the method preferred by the Trust is to reimburse the City for costs rather than donating the entire project cost. Staff will submit paid invoices to the Trust for reimbursement.

FISCAL IMPACT
UBC Inc’s bid to perform the proposed work is $110,135.00. A 10% construction contingency will be added to the contract for any unforeseen conditions encountered during construction. The proposed contract value, including contingency, is $121,148.50.

Funding for the project will be obtained from the Betty Boyle Davis Trust via cost reimbursement.

ACTION REQUESTED -
AWARD THE PROJECT CONTRACT (A-3590) TO UBC INC.; AND AUTHORIZE THE MAYOR TO SIGN.
136
Item 9.

ATTACHMENTS:

Proposal from UBC, Inc.

Project Contract (A-3590)
137
Item 9.

Proposal R2
To: Tim Kaber Date: June 26, 2026
[email protected] Work Order #: N/A
Project: Pioneer History Museum Expiration Date: 30 days from proposal date Scope of Work: Roofing-Pioneer History Museum
Total Roofing Proposal $61,830.00
Scope of Work: HVAC-Pioneer History Museum
Total HVAC Proposal $39,405.00
Additive alternate if new roof curb is needed $8,900.00 Total of Roofing and HVAC Proposal $101,235.00
Total of Roofing and HVAC Proposal with additive alternative $110,135.00 Thank you
Edgar Ibarra
United Building Contractors, Inc
Material Shipments:
275 Fairchild Ave, Suite 107
Chico, CA 95973
Inclusions:

1. Tear off existing layers of roofing and haul away

2. Inspect for water damage Note: Required repairs due to water damage will be billed as an additional cost upon Owner's approval

3. Fabricate and install 56 metal squares to cover solar tanchin hold in wood deck

4. Install peel and stick self-adhered underlayment

5. Fabricate and install new edge metal

6. Replace and paint new pipe flashings

7. Fabricate and install one (1) new chimney saddle

8. Install GAF ULTRA dimensional shingles (color by Owner)

9. Install new high profile ridge cap

10. Two (2) year warranty on workmanship

11. Manufacturers warranty on materials

12. Owner shall provide access to building from next door or behind building Exclusions: Existing leaks, low spots, wood decking, blocking, electrical, plumbing, Garland materials, siding, stucco, Inclusions:

Removal of the existing 4- ton package unit and duct plenum from the roof. Install a 5- ton Bryant package unit BRSP575NWB60090N and resize wood roof curb as needed, code compliant economizer, new duct drops thru the roof. Connect to the existing supply duct in the attic, connect to the existing return duct in the attic and add a additional return duct and grill between the two existing returns in the same hallway. Connect the existing electrical and gas line to the new unit and start up of the new system.

The building square footage is bigger than what a 5 ton unit capacity can maintain. With only single-phase power available the 5 ton unit is our only option. Adding a additional unit may be necessary.

Exclusions: Design and unit sizing. No structural engineering or structural carpentry or work is included. No testing, adjusting and balancing is included. Also excluded is all plumbing, electrical, roofing, metal roofing, metal framing or sheeting, carpentry, painting, concrete, concrete cutting, lead roof jacks, roof drains and leader pipe, Life and Safety, Alarm systems, controls (only thermostat is being provided) or any work not listed above.

Mailing Address:

PO Box 6039
Chico, CA 95927
Phone 530.345.8455
Fax 530.345.8885
Lic. 679303
Exhibit B
138
Item 9.

CF - 1
A-3590

PROJECT CONTRACT
THIS PROJECT CONTRACT (the “contract” or “Contract”), is made and entered into this 7 th day of
July, 2026 by and between City of Oroville (referred to herein as the “Owner” or the “City”) and United Building Contractors Inc. (UBC) (the "Contractor").

WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:

1. THE CONTRACT DOCUMENTS.

The complete contract is comprised of and may or may not include: Invitation for Bids; Information for Bidders; Bid Schedule; Proposal Form; Bidder’s Bond; Contract; General Conditions; Special Provisions; Technical Provisions; Payment Bond; Performance Bond; Notice of Award; Notice to Proceed; Change Orders; Supplemental Drawings Issued; Drawings; Specifications and Contract Documents; All addenda or bulletins issued during the time of bidding or forming a part of the documents loaned to the bidder for preparation of the bid; The complete plans and provisions, regulations, ordinances, codes, and laws incorporated therein or herein by reference or otherwise applicable to the Project.

All of the above documents are intended to cooperate so that any work called for in one and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents.

The documents comprising the complete contract are hereinafter referred to collectively as the Contract Documents.

2. THE WORK.

The Contractor shall furnish all labor, materials, equipment, tools, supervision, transportation, permits, and incidentals necessary to perform and complete the Work described in Exhibit A, attached hereto and incorporated herein by reference. For the purposes of this Agreement, Exhibit A shall consist of the Scope of Work included in the Request for Proposal (RFP) and the Contractor’s proposal submitted in response to the RFP. In the event of conflict between the RFP Scope of Work and Contractor’s Proposal, the requirements of the RFP Scope of Work shall govern unless approved in writing by the City.

3. CONTRACT PRICE.

The City agrees to pay and the Contractor agrees to accept, in full payment for the work above agreed to be done, the following compensation: $110,135.00. In no event shall Contractor’s compensation exceed the amount of $121,148.50 without additional written authorization from the City. Payment by City under this Agreement shall not be deemed a waiver of defects in Consultant’s services, even if such defects were known to the City at the time of payment.

For the purpose of fixing the amount of bondsreferred to in the Instructions to Bidders, it is estimated by both Parties that the total contract price shall be based on the Contractor’s Base Bidamount.

4. DISPUTES PERTAINING TO PAYMENT FOR WORK.

Should any dispute arise respecting the true value of any work done or any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor during the performance of this Contract, the dispute shall be informally mediated between the parties.

Following such mediation, either party may file an action exclusively in the Butte County Superior Court or in the United States District Court, Eastern District of California. Under no condition shall there be a cessation of work by the Contractor during any such dispute. This article does not exclude recovery of 139
Item 9.

CF - 2
A-3590
damages by either party for delays.

5. PAYMENT.

Not later than the 20th day of each calendar month, the Contractor shall make a partial payment request to the City on the basis of an estimate approved by the Engineer of the work performed since the last partial payment request during the preceding month by the Contractor with five percent (5%) of the amount of each such estimate retained by the City, until completion of the Project and the recordation of a Notice of Completion of all work covered by this Contract. The City shall make any partial payments provided for in this contract to the Contractor within 30 days of the City’s receipt of an undisputed and properly executed partial payment request from the Contractor. The City shall pay the Contractor interest on the amount of any portion of a partial payment, excluding retention amounts, not made to the Contractor within 30 days of the City’s receipt of an undisputed and properly executed partial payment request from the Contractor at the legal rate set forth in California Code of Civil Procedure Section 685.010. Upon receipt of a partial payment request from the Contractor, the City shall review the partial payment request for the purpose of determining whether or not the partial payment request is a proper partial payment request. Any partial payment request determined by the City not to be a proper partial payment request suitable for payment shall be returned to the Contractor by the City within 14 days of the City’s receipt of such partial payment request. A partial payment request returned to the Contractor by the City under the provisions of this section shall be accompanied by a written document setting forth the reason(s) why the partial payment request is not proper. The number of days for the City to make a certain partial payment provided for in this Contract, without incurring interest pursuant to this section, shall be reduced by the number of days by which the City exceedsthe 14 day return period forsuch partial payment request, if determined to be improper, as set forth in this section. For the purposes of this section, a “partial payment” means all payments due to the Contractor under this contract, exclusive of that portion of the final payment designated as retention earnings. Also, for the purposes of this section, a partial payment request shall be considered properly executed by the City, if funds are available to pay the partial payment request and payment is not delayed due to an audit inquiry by the City’s financial officer. The City will release Contractor's retention earnings within 45 days after recordation of Notice of Completion, as defined in California Civil Code Section 3093. Recordation of a Notice of Completion for the Project by the City shall constitute the City’s acceptance of the Project work.

6. TIME FOR COMPLETION.

All work under this contract shall be completed within a period of 60 days from the date of the Contractor's receipt of a Notice to Proceed from the City.

7. EXTENSION OF TIME.

If the Contractor is delayed by acts of negligence of the City, or its employees or those under it by contract or otherwise, or by changes ordered in the work, or by strikes, lockouts, fire, unavoidable casualties, or any causes beyond the Contractor's control, or by delay authorized by the City, or by any justifiable cause which the Engineer shall authorize, then the Contractor shall make out a written claim addressed to the City setting forth the reason for the delay and the extension of the time requested and forward a copy of the claim to the Engineer for approval. The Engineer will evaluate the claim and if the claim is justifiable, will request the City's approval. No such extension will be allowed unless written claim therefore has been made within 5 days after the delay became apparent.

If the Contractor fails or refuses to complete the work within the time specified, including authorized extensions, there shall be deducted from monies due the Contractor, not as a penalty, but as liquidated damages the sum of ($500.00) for each calendar day subsequent to the time specified for each project and the time the work is actually completed and accepted. Delays caused by adverse weather conditions or conditions for which the Owner is clearly responsible will be added to the contract time. 140
Item 9.

CF - 3
A-3590

8. LABOR PROVISIONS.

The project is subject to both federal and state prevailing wages. The Contractor shall pay laborers the higher of either the federal or state prevailing wage rate determination for the trades to be utilized. The contractor and all subcontractors on the project shall complete electronic reporting of prevailing wage rate reports through the Department of Industrial Relations, with copies of such reports to be provided to the City.

9. CONTRACT WORK HOURS AND SAFETY STANDARDS REQUIREMENTS.

As used in the following provision, the term “laborers” and “mechanics” include watchmen and guards. a. Overtime Requirements. Neither the Contractor nor any subcontractor contracting for any part of the Project which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not lessthan one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek, whichever is greater.
b. Violation; Liability for Unpaid Wages; Liquidated Damages. In the event of any violation of the clause set forth in paragraph a. above, the Contractor and any subcontractor responsible therefore shall be liable for the unpaid wages. In addition, the Contractor and subcontractor shall be liable to the City for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph a. above, in the sum of $3,000 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph a. above.
c. Withholding for Unpaid Wages and Liquidated Damages. The City shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any monies payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal contract with the same Contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same Contractor, such sums as may be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph b. above. d. Working conditions. Neither the Contractor nor any subcontractor may require any laborer or mechanic employed in the performance of any contract to work in surroundings or under working conditions that are unsanitary, hazardous or dangerous to his health or safety as determined under construction safety and health standards (29 CFR Part 1926) issued by the Department of Labor. e. Working Hours. Work must be performed during weekdays. Weekend work may be permitted upon request and approval by the Museum Curator and Public Works Director. f. Subcontracts. The Contractor and any subcontractor shall insert in any subcontracts the clauses set forth in paragraphs a. through d. and also a clause requiring the subcontractor to include these clauses in any lower tier subcontracts. The Contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs a. through e.

10. NONDISCRIMINATION.

The Contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment 141
Item 9.

CF - 4
A-3590
practices when the contract covers a program set forth in Appendix B of the Regulations.

11. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM PROVISIONS.

The Contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as recipient deems appropriate.

The Contractor agrees to pay each subcontractor under this contract for satisfactory performance of its contract no later than 10 days from the receipt of each payment the Contractor receives from City. The Contractor agrees further to return retainage payments to each subcontractor within 30 days after the subcontractor's work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the City. This clause applies to both DBE and non-DBE subcontractors.

12. CIVIL RIGHTS.

The Contractor assures that it will comply with pertinent statutes, Executive Orders and such rules as are promulgated to assure that no person shall, on the grounds of race, creed, color, national origin, sex, age or handicap be excluded from participating in any activity conducted with or benefiting from Federal assistance.

This Provision binds the Contractor from the bid solicitation period through the completion of the contract.

This provision shall be inserted in all subcontracts, subleases and other agreements at all tiers.

13. SOLICITATIONS FOR SUBCONTRACTS, INCLUDING PROCUREMENTS OF MATERIALS ANDEQUIPMENT.

In all solicitations either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color or national origin.

14. INFORMATION AND REPORTS.

The Contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the City to be pertinent to ascertain compliance with such Regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refusesto furnish thisinformation, the Contractor shallso certify to the City and shall set forth what efforts it has made to obtain the information.

15. SANCTIONS FOR NONCOMPLIANCE.

In the event of the Contractor's noncompliance with the nondiscrimination provisions of this contract, the City shall impose such contract sanctions as it may determine to be appropriate, including but not limited to:
a. Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
b. Cancellation, termination, or suspension of the contract, in whole or in part.

16. INSPECTION OF RECORDS.
142
Item 9.

CF - 5
A-3590
The Contractor shall maintain an acceptable cost accounting system. The City or any of their duly authorized representatives shall have access to any books, documents, paper, and records of the Contractor which are directly pertinent to this Contract or the Project for the purposes of making an audit, examination, excerpts, and transcriptions. The Contractor shall maintain all required records for 3 years after the City makes final payment and all other pending matters are closed.

17. RIGHTS IN INVENTIONS.

All rightsto inventions and materials, if any, generated under this contract are subject to regulations issued by the City. Information regarding these rights is available from the City.

18. BREACH OF CONTRACT TERMS.

Any violation or breach of terms of this Contract on the part of the Contractor or its subcontractors may result in the suspension or termination of this Contract or such other action that may be necessary to enforce the rights of the City under this Contract. The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law.

19. TERMINATION OF CONTRACT BY CITY
a. The City may, by written notice, terminate this Contract in whole or in part at any time, either for the City’s convenience or because of the Contractor’s failure to fulfill its contract obligations. Upon receipt of such notice, services shall be immediately discontinued (unless the notice directs otherwise) and all materials as may have been accumulated in performing this Contract, whether completed or in process, delivered to the City.
b. If the termination isfor the convenience of the City, an equitable adjustment in the contract price shall be made, but no amount shall be allowed for anticipated profit on unperformed services. c. If the termination is due to failure to fulfill the Contractor’s obligations, the City may take over the work and prosecute the same to completion by contract or otherwise. In such case, the Contractor shall be liable to the City for any additional cost occasioned to the City thereby. d. If, after notice of termination for failure to fulfill contract obligations, it is determined that the Contractor had not so failed, the termination shall be deemed to have been affected for the convenience of the City. In such event, adjustment in the contract price shall be made as provided in the second paragraph of this clause.
e. The rights and remedies of the City provided in this clause are in addition to any other rights and remedies provided by law or under this contract.

20. INCORPORATION OF PROVISIONS.

The Contractor shall include the provisions of this contract in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations of directives issued pursuant thereto. The Contractor shall take such action with respect to any subcontract or procurement as the City may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the Contractor may request the City to enter into such litigation to protect the interests of the City and, in addition, the Contractor may request the United States to enter into such litigation to protect the interests of the United States.
143
Item 9.

CF - 6
A-3590

21. CONTRACTOR CLAIMS OF $375,000 OR LESS.

Claims by the Contractor relating to the Project for (a) a time extension, (b) money or damages arising from work done by, or on behalf of, the Contractor on the Project for which payment is not expressly provided for or to which the Contractor is not otherwise entitled, or (c) an amount that is disputed by the City, with a value of $375,000 or less, are subject to the claims procedures set forth in California Public Contract Code Sections 20104, et seq., except as otherwise provided in this Contract and the incorporated documents, conditions and specifications.

22. LOBBYING AND INFLUENCING FEDERAL EMPLOYEES.
a. No Federal appropriated funds shall be paid, by or on behalf of the Contractor or its subcontractors, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the making of any Federal grant or the amendment or modification of any Federal grant. b. If any funds other than Federal appropriated funds have been paid or will be paid by the Contractor or its subcontractors to any person for influencing or attempting to influence an officer or employee of the City, any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any Federal grant, the contractor shall complete and submit Standard Form-LLL, “Disclosure of Lobby Activities,” in accordance with its instructions.

23. ASSIGNMENTOF CERTAIN RIGHTS TO THE CITY.

In entering into this Contract or a subcontract to supply goods, services, or materials pursuant to this Contract, the Contractor and/or subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to this Contract or the subcontract. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.

24. ENERGY CONSERVATION REQUIREMENTS
The contractor agrees to comply with mandatory standards and policies relating to energy efficiency that are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Public Law 94-163)
144
Item 9.

CF - 7
A-3590
IN WITNESS WHEREOF, two identical counterparts of this Contract, each of which shall for all purposes be deemed an original thereof, have been duly executed by the parties hereinabove named, on the day and year first herein written.

AGENCY: City of Oroville (First Party)
By:
(David Pittman)
(Mayor)
CONTRACTOR: United Building Contractors (Second Party)
By:
(Jim Gilmore)
(President)
145
Item 9.

CF - 8
A-3590

FORM OF PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS: That WHEREAS, the City of Oroville, California hereinafter called City, on July 7, 2026 , awarded
United Building Contractors P.O. Box 6039 Chico, CA 95927 Name and Address of Contractor hereinafter
designated as the "Principal", the contract for:

Pioneer Museum Roof and HVAC Repair Project
NOW THEREFORE, we the Principal, and
as Surety, are held and firmly
bound unto , hereinafter called the
, in the penal sum of
Dollars($ )
lawful money of the United States, for the payment of which sum we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, if the above bounden Principal, his/her or its heirs, executors, administrators, successors or assign, shall in all things stand to and abide by and keep and perform the covenants, conditions and agreements in the said contract and any alteration thereof made as therein provided, on his/her or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers and agents, astherein stipulated, then this obligation shall become null and void: otherwise, it shall be and remain in full force and virtue, and also in case suit is brought upon such bond, the above bounden principal and the said surety will pay a reasonable attorney's fee which shall be awarded by the court to the prevailing party in said suit, said attorney's fee to be taxed as costs in said suit and to be included in the judgment therein rendered.

And the surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed or materials and/or equipment to be furnished thereunder or the Specifications accompanying the same, shall in anywise affect its obligations on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the Specifications.

IN WITNESS WHEREOF three identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and Surety above named, on the day of, 20.

By By
Surety Contractor
146
Item 9.

CF - 9
A-3590

FORM OF LABOR AND MATERIAL BOND
KNOW ALL PERSONS BY THESE PRESENTS: That we as Surety, and , as Principal, are held and firmly bound unto City of Oroville, in the sum of Dollars ($ ), said sum being (100% of the estimated amount of the foregoing and annexed contract,
Pioneer Museum Roof and HVAC Repair Project
to be paid to said , for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH: That if the above bounden principal, as Contractor in the annexed contract or his/her subcontractors, shall fail to pay for any materials, provisions, provender, or other supplies or teams used in, upon, for or about the performance of the work contracted to be done, or shall fail to pay any person, company or corporation renting or hiring teams or implements or machinery for or contributing to said work to be done, or any person who supplies both work and materials therefore, or the amount due under the Employment Insurance Act with respect to such work or labor, the surety will pay for the same, in an amount not exceeding the above obligation, and also, in case suit is brought upon such bond, the above bounden principal and the said surety will pay a reasonable attorney's fee which shall be awarded by the court to the prevailing party in said suit, said attorney's fee to be taxed as costs in said suit and to be included in the judgment therein rendered. This obligation and bond shall insure to the benefit of any and all persons entitled to file claims under Section 1184C of the Code of Civil Procedure and said persons or any of them or their assigns shall have a right to action thereunder.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this day of , A.D., 20 .

Principal
Surety
(Seal) By
(Attorney in Fact)

STATE OF CALIFORNIA )
) ss.

COUNTY OF BUTTE )
On this day of , 20, before me
a Notary Public in and for the County of ,
known
to me to be the person whose name is subscribed to the within instrument as the Attorney in Fact of and acknowledged to me that he has subscribed the name of thereto as surety, and his/her own name as Attorney in Fact.

In witness whereof I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written.

Notary Public in and for said County and State
147
Item 9.

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR AND COUNCIL MEMBERS
FROM: TIM KABER – DIRECTOR OF PUBLIC WORKS/CITY

ENGINEER
RE: APPROVAL OF FINAL 2026 SPEED ZONE ENGINEERING

AND TRAFFIC SURVEY
DATE: JULY 7, 2026

SUMMARY
The City Council shall consider approving the final for the 2026 Speed Zone Engineering and Traffic Survey (E&TS) performed by Wood Rodgers, Inc. of Roseville CA.

DISCUSSION
The City of Oroville awarded a contract to Wood Rodgers of Roseville, CA, on November 18, 2025 to update the speed zone surveys in the City of Oroville. The draft report has been reviewed by staff and is ready for Council review and input. The last E&TS was performed in 2011, and expired early 2025. The 2026 report surveys were performed in January and February of 2026, with data analysis and report preparation following. There were 53 segments surveyed in the 2026 report, which is an increase of 10 from the 2011 report.

The draft report was presented to Council on June 2, 2026.

Council asked Staff to review segment 38, Orange Ave between Montgomery Street and Long Bar Road to determine if the suggested speed could be lowered to 35 mph.

The speed limit can be lowered to 35 mph within the allowable reductions from the CVC and MUTCD. The final report reflects this change.

E&TS use criteria established in the California Vehicle Code (CVC) and California Manual for Uniform Traffic Control Devices (CA MUTCD) to establish or reaffirm legally enforceable speed limits.

The segments were chosen based on California Road System functional classification, which is available at
https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=026e830c914c49 5797c969a3e5668538.
148
Item 10.

All speed limits for roads not included in this report (Business District, Residential District, local roads) may be set via ordinance as prima facie speed limits per the CVC and CA MUTCD.

The final report must be adopted by the governing body before enforcement efforts via electronic means may be used.

New/changed speed limits must be posted for 30 days before tickets may be issued.

The contractor recommends keeping the previously established speed limit at all but 5 locations.

Road Segment (number) New Speed Limit
Garden Drive (15) 45 mph (not previously posted)
Larkin Road (21) 55 mph (not previously posted)
Long Bar Road (25) 35 mph to 30 mph
Lower Wyandotte Road (26) 40 mph to 35 mph
Table Mountain Blvd (49) 45 mph to 40 mph

FISCAL IMPACT
No fiscal impact, this report is currently under contract.

ACTION REQUESTED -
APPROVE THE FINAL REPORT.

ATTACHMENTS

1. Final 2026 Speed Zone Engineering and Traffic Survey Report 149
Item 10.
2026 SPEED ZONE ENGINEERING

AND TRAFFIC SURVEY

CITY OF OROVILLE

PUBLIC WORKS DEPARTMENT
FINAL
JULY 2026
150
Item 10.

TABLE OF CONTENTS

1.0 INTRODUCTION.................................................................................................. 1

2.0 BACKGROUND METHODOLOGY .................................................................. 2

3.0 DATA COLLECTION .......................................................................................... 3

3.1 Survey Locations .................................................................................................. 3

3.2 Data Collection Procedures ................................................................................ 3

3.3 Collision History .................................................................................................... 4

4.0 FIELD DATA PROCESSING............................................................................. 4

5.0 ENGINEERING ANALYSIS............................................................................... 4

6.0 RECOMMENDED SPEED LIMITS ................................................................... 5

7.0 LOCAL ROADWAYS.......................................................................................... 8

8.0 SUMMARY............................................................................................................ 9 Figures
Figure 1 – Speed Survey Locations
Figure 2 – Speed Survey Map
Figure 3 – Residential and Business Districts
Figure 4 – Local Roadway Segments
Tables
Table 1 – Summary of Posted and Recommended Speed Limits Appendices
Appendix A – Speed Zone Surveys
Appendix B – California Vehicle Code and MUTCD Regulations 151
Item 10.

City of Oroville 1
2026 Engineering and Traffic Survey

1.0 INTRODUCTION
The City of Oroville completed a Speed Zone Engineering and Traffic Survey (E&TS) to revise the previous E&TS completed in 2010 and update posted speed limits on public roadways within the City. The survey reflects current roadway conditions, traffic operations, land use, and applicable provisions of the California Vehicle Code (CVC) and the California Manual on Uniform Traffic Control Devices (CA MUTCD).

Roadway Segment
Bagget Marysville Road Georgia Pacific Way to Ophir Road Baldwin Myers Street to Yard Street
Boynton Avenue Bridge Street to Orange Avenue
Bridge Street Oro Dam Boulevard to Montgomery Street
Canyon Highlands Drive Oroville Quincy Highway to City Limits Cherokee Road Table Mountain Road to City Limits
Eighteenth Street Oroville Dam Boulevard to Feather Avenue Feather River Boulevard Montgomery Street to Mitchell Avenue Feather River Boulevard Mitchell Avenue to Oro Dam Boulevard Feather River Boulevard Oro Dam Boulevard to Georgia Pacific Way Fifth Avenue Mitchell Avenue to Oro Dam Boulevard
Fifth Avenue Montgomery Street to Mitchell Avenue
Foothill Boulevard Olive Highway to City Limits
Foothill Boulevard Oro Quincy Highway to Olive Highway
Garden Drive SR 70 to Table Mountain Boulevard1
Georgia Pacific Way Hwy 70 to Bagget Marysville Road
Glen Drive Oroville Dam Boulevard to City Limits
Grand Avenue 5th Street to Table Mountain Boulevard
Highlands Blvd Oro Dam Blvd E to Canyon Highlands Dr
Huntoon Street Montgomery Street to Lincoln Boulevard
Larkin Road City Limits to Oro Dam Boulevard
Lincoln Street High Street to Montgomery Street
Lincoln Street High Street to Oro Dam Boulevard
Lincoln Boulevard Oro Dam Boulevard to City Limits
Long Bar Road City Limits to Orange Avenue
Lower Wyandotte Road Olive Highway to Oro Garden Ranch Road Mitchell Avenue Veatch Street to Bridge Street
Mitchell Avenue Feather River Boulevard to Veatch Street Montgomery Street Feather River Boulevard to Washington Street Montgomery Street Washington Avenue to Orange Avenue
Myers Street Montgomery Street to Oro Dam Boulevard
Myers Street Oro Dam Boulevard to Wyandotte Avenue
Myers Street Wyandotte Ave to Lincoln Blvd
Nelson Avenue Highway 70 to City Limits
Nelson Avenue Highway 70 to Table Mountain Boulevard
Ophir Road City Limits to City Limits
Orange Avenue Washington Avenue to Montgomery Street
Orange Avenue Montgomery Street to Long Bar Road
Orange Avenue Long Bar Road to Oro Dam Boulevard
Oro Bangor Highway Lincoln Blvd to City Limits
152
Item 10.

City of Oroville 2
2026 Engineering and Traffic Survey
Oro Dam Boulevard Olive Highway to Orange Avenue
Oro Dam Boulevard Orange Avenue to Valley View Drive
Oro Dam Boulevard Valley View Drive to City Limits
Oro Quincy Highway Oro Dam Boulevard to Foothill Boulevard Spencer Avenue Baldwin Avenue to Oro Dam Boulevard East South 5th Avenue Oro Dam Boulevard to SC-OR
South 5th Avenue SCOR to Georgia Pacific Way
Table Mountain Boulevard Riverview Terrace to Nelson Avenue Table Mountain Boulevard Nelson Avenue to City Limits
Washington Avenue Montgomery Street to Mitchell Avenue
Washington Avenue Mitchell Avenue to Oro Dam Boulevard
Wyandotte Avenue Richter Avenue to Lower Wyandotte Road Yard Street Baldwin Avenue to Washington Avenue
Radar speed surveys were conducted on fifty-three (53) roadway segments throughout the City listed above. This data was considered along with other factors, including collision records, roadway characteristics, adjacent land uses, and sight distances.

Typically, roadway speed limits are established based upon a combination of these factors along with the measured “critical vehicle speed.” This is referred to as the 85th percentile speed and is defined as the speed at which 85 percent of the motorists are traveling at or below. The following sections describe the data collection, analyses and recommendations for the E&TS.

2.0 BACKGROUND METHODOLOGY
Speed zoning or the application of designated vehicle speed limits on public streets is regulated by the California Vehicle Code (CVC) and the California Manual of Uniform Traffic Control Devices (MUTCD). Typically, speed zoning is warranted on streets and thoroughfares where there are "appreciable" amounts of traffic volumes and where speed zones would help contribute to the "orderly movement" of traffic by increasing driver awareness of a reasonable speed. The basic goal of speed zoning is to prevent motorists from operating at a wide range of speeds along a thoroughfare that could create vehicle conflicts.

Speed zones allows motorists to travel at or near the same speeds. Speed limits range from absolute to prima facie. Absolute speed limits are usually found on highways and freeways where the maximum speed limit (e.g., 55 mph to 70 mph) cannot be exceeded. Prima facie speed limits are established through speed zoning studies. In some instances, there are automatic prima facie speed limits. These include a 25 mph speed limit on any street, other than a state highway, in any business or residence district unless a different speed is determined by local authority under procedures set forth in the latest CVC and California MUTCD.

CVC 235 defines a "business district" as that portion of a highway and the property contiguous thereto (a) upon one side of which highway, for a distance of 600 feet, 50 percent or more of the contiguous property fronting thereon is occupied by buildings in 153
Item 10.

City of Oroville 3
2026 Engineering and Traffic Survey
use for business, or (b) upon both sides of which highway, collectively, for a distance of 300 feet, 50 percent or more of the contiguous property fronting thereon is so occupied.

CVC 515 defines “residence district” as that portion of a highway and the property contiguous thereto, other than a business district, (a) upon one side of which highway, within a distance of a quarter mile, the contiguous property fronting thereon is occupied by 13 or more separate dwelling houses or business structures, or (b) upon both sides of which highway, collectively, within a distance of a quarter of a mile, the contiguous property fronting thereon is occupied by 16 or more separate dwelling houses or business structures.

3.0 DATA COLLECTION

3.1 Survey Locations
Speed zone surveys were conducted by National Data & Surveying Services (NDS) at the 53 locations listed in Section 1.0. A Radar Recorder manufactured by Kustom Signals was used for these surveys. Figure 1 depicts the location of the speed surveys conducted for each road section.

For each survey, a Vehicle Speed Data Sheet (VSDS) was prepared summarizing the measured vehicle speed characteristics, such as average speed, critical speed (85th percentile speed), pace speed and the posted speed limit. The VSDS numbers match the field survey location numbers shown in Figure 1. Copies of the VSDS’s are included in Appendix A.

3.2 Data Collection Procedures
Radar Speed Surveys were conducted in accordance with the Department of Motor Vehicle Regulations and the Manual on Uniform Traffic Control Devices (MUTCD).

Collection sites are investigated in advance to identify conditions that would adversely affect data accuracy such as proximity to speed bumps, proximity to intersections, locations with steep grades, and any other conditions that could impact normal vehicle speeds. Surveys were not conducted during inclement weather or when the roadway is wet. Surveys were not conducted during atypical conditions such as road construction, detours, or traffic accidents.

A sample of free-flowing passing cars were selected with careful attention to ensure that the sample represents the entire traffic stream. In platoon flow, only the first vehicle in the platoon was selected. All vehicles traveling at less than 40 mph and within 200 feet of the lead vehicle or more than 40 mph and less than 350 feet from the lead vehicle were considered to be in platoon. Field staff were trained to be inconspicuous so that driver behaviors are not affected by their presence.
154
Item 10.

City of Oroville 4
2026 Engineering and Traffic Survey

3.3 Collision History
Collision data was obtained by staff from the California Crash Reporting System (CCRS). A minimum of two years of collision data is the standard for an E&TS. Collision data was analyzed for the period between 2024 and 2025. It is unlikely that any of these collisions would be corrected by reducing the speed limit.

4.0 FIELD DATA PROCESSING
Traffic speed and vehicle count data downloaded from the Radar Recorder were processed to prepare a data summary of the speed of all of the vehicles observed. For each survey, a Vehicle Speed Data Sheet (VSDS) was prepared summarizing the measured vehicle speed characteristics, such as total number of vehicles observed, average speed, critical speed (85th percentile speed), pace speed and the currently posted speed limit. The VSDS numbers match the field survey location numbers shown in Figure 1. Copies of the VSDS’s are included in Appendix A. Brief definitions of the traffic terms “average speed”, “85th percentile” and “pace” are listed below:

The average speed or 50th percentile is the arithmetical mean of the speeds observed and is derived by dividing the sum of all the speeds observed by the total number of observations.

The 85th percentile speed is that speed at or below 85 percent of the observed vehicles are traveling. The 85th percentile speed (also called the critical speed) of a spot speed survey is the primary indicator of a speed limit that might be imposed.

The pace is the 10 mile per hour increment of observed speeds that contains the greatest number of vehicles. In nearly all cases, the 85th percentile speed and the recommended speed limit lie somewhere within the pace, frequently in the middle to upper ranges. The percentage in the pace is often between 60 and 80.

5.0 ENGINEERING ANALYSIS
The short method of speed zoning is based on the premise that a reasonable speed limit is one that conforms to the actual behavior of the majority of motorists, and that by measuring motorists’ speeds, one will be able to select a speed limit that is both reasonable and effective. Other factors that need to be considered include but are not limited to the most recent two-year collision record, roadway design speed, safe stopping sight distance, shoulder conditions, adjacent land uses and pedestrian traffic.

For City roadways, the speed limit normally should be established at the nearest five miles per hour increment to the 85th percentile speed. However, the factors described above may indicate the need to reduce the speed limit by 5 to 10 mph and should be documented in the E&TS.
155
Item 10.

City of Oroville 5
2026 Engineering and Traffic Survey

6.0 RECOMMENDED SPEED LIMITS
Recommended speed limits were developed using radar speed survey data collected in 2026 and engineering judgment consistent with CA MUTCD Section 2B.13 and applicable provisions of the California Vehicle Code.
• Road sections where the assigned speed limit is based solely on the calculated 85th percentile pursuant to Section 2B.13 of the MUTCD.
• Road sections where the assigned speed limit is based on the road section conforming to a residential or business district pursuant to CVC Section 22352(b)(1). • Road sections where the assigned speed limit is based on the road section conforming to the density provisions of CVC Section 627(c)(1)(C). • Road sections where the assigned speed is based on pedestrian safety pursuant to CVC Section 627(c)(2).
• Road sections where the assigned speed that would typically be rounded up is rounded down to the lower five-mile-per-hour increment of the calculated 85th percentile pursuant to CVC Section 22358.6
• Road sections where the assigned speed is based on designation as a safety corridor pursuant to CVC Section 22358.7(a)(1).
• Road sections where the assigned speed is based on proximity to any land or facility that generates high concentrations of bicycles or pedestrians pursuant to CVC Section 22358.7(a)(2).
• Road sections where the assigned speed is to retain the currently adopted speed limit or restore the immediately prior adopted speed limit where no additional general purpose lanes have been added to the roadway since completion of the traffic survey that established that speed limit pursuant to CVC Section 22358.8.

Table 1 summarizes the existing posted speed limit, speed survey data, and the recommended speed limit for each roadway segment. The Assigned Speed shown in Table 1 represents the recommended posted speed limit for each roadway segment based on the 2026 Engineering and Traffic Survey.

Roadway segments classified as Residential or Business Districts retain a 25-mile-per-hour (MPH) prima facie speed limit pursuant to California Vehicle Code (CVC) Section 22352(b)(1). Roadway segments within posted school zones retain a 25 MPH prima facie speed limit pursuant to CVC Section 22352(a)(2)(B). 156
Item 10.

City of Oroville 6
2026 Engineering and Traffic Survey
Where reductions from the rounded 85th percentile speed occur, they are supported by residential or business frontage density provisions under CVC Section 627(c)(1)(C), pedestrian and bicyclist safety considerations under CVC Section 627(c)(2), rounding provisions under CVC Section 22358.6(C), or proximity to high pedestrian or bicycle generators under CVC Section 22358.7(a)(2). In some cases, previously adopted speed limits are retained pursuant to CVC Section 22358.8(A).

Roadway segments in Table 1 where the recommended speed limit differs from the existing posted speed limit, or where no current posted speed limit exists and new signing is required, are shown in bold. The applicable sections of the California MUTCD and the California Vehicle Code are included in Appendix B. Figure 2 depicts the recommended speed limits for the 53 roadway segments evaluated as part of the 2026 Engineering and Traffic Survey.

Speed Limits Assigned – MUTCD Section 2B.13 (11 Road Sections) The speed limits for the following 11 roadway segments were assigned based on the calculated 85th percentile speed, rounded to the nearest 5-MPH increment, in accordance with California MUTCD Section 2B.13. For these segments, no additional reductions pursuant to CVC provisions were applied.
• Bagget Marysville Road (Segment 1) – Speed limit remains 45 MPH. • Feather River Boulevard (Segment 10) – Speed limit remains 45 MPH. • Garden Drive (Segment 15) – Speed limit recommended at 45 MPH. This roadway segment does not have an existing posted speed limit and will require installation of new 45 MPH speed limit signs.
• Georgia Pacific Way (Segment 16) – Speed limit remains 45 MPH. • Long Bar Road (Segment 25) – Speed limit recommended at 30 MPH, a decrease from the existing 35 MPH.
• Mitchell Avenue (Segment 28) – Speed limit remains 35 MPH. • Nelson Avenue (Segment 35) – Speed limit remains 45 MPH. • Oro Dam Boulevard (Segment 41) – Speed limit remains 40 MPH. • Oro Dam Boulevard (Segment 43) – Speed limit remains 45 MPH. • Spencer Avenue (Segment 45) – Speed limit remains 25 MPH. • South Fifth Avenue (Segment 47) – Speed limit remains 45 MPH.

Speed Limits Assigned – CVC Section 22352(b)(1) (16 Road Sections) The speed limits for the following 16 roadway segments were assigned pursuant to CVC Section 22352(b)(1), Residential or Business District. For each of these roadway segments, the recommended speed limit remains 25 MPH, regardless of the measured 85th percentile speed:
• Baldwin Avenue (Segment 2)
• Boynton Avenue (Segment 3)
• Bridge Street (Segment 4)
157
Item 10.

City of Oroville 7
2026 Engineering and Traffic Survey
• Canyon Highlands Drive (Segment 5)
• Cherokee Road (Segment 6)
• Fifth Avenue (Segment 12)
• Highlands Boulevard (Segment 19)
• Montgomery Street (Segment 29)
• Montgomery Street (Segment 30)
• Myers Street (Segment 32)
• Myers Street (Segment 33)
• Orange Avenue (Segment 37)
• Orange Avenue (Segment 38)
• Oro Bangor Highway (Segment 40)
• Wyandotte Avenue (Segment 52)
• Yard Street (Segment 53)
Figure 3 shows the location of roadway segments located in residential and business districts.

Speed Limits Assigned – CVC Section 627(c)(1)(C) (6 Road Sections) The speed limits for the following six (6) roadway segments were assigned pursuant to CVC Section 627(c)(1)(C), which allows for a reduction from the rounded 85th percentile speed based on residential or business frontage density. • Feather River Boulevard (Segment 8) – Speed limit remains 35 MPH. • Huntoon Street (Segment 20) – Speed limit remains 25 MPH. • Lincoln Street (Segment 22) – Speed limit remains 25 MPH. • Lincoln Street (Segment 23) – Speed limit remains 30 MPH. • Oro Dam Boulevard (Segment 42) – Speed limit remains 40 MPH. • Washington Avenue (Segment 51) – Speed limit remains 25 MPH Speed Limits Assigned – CVC Section 627(c)(2) (1 Road Section) The speed limit for the following one (1) roadway segment was assigned based on pedestrian and bicyclist safety considerations pursuant to CVC Section 627(c)(2):
• Eighteenth Street (Segment 7) – Speed limit remains at 25 MPH.

Speed Limits Assigned – CVC Section 627(c)(2) & 22358.7(a)(2) (2 Road Sections) The speed limit for the following two (2) roadway segments were assigned based on pedestrian and bicyclist safety considerations pursuant to CVC Section 627(c)(2) and proximity to any land or facility that generates high concentrations of bicycles or pedestrians pursuant to CVC Section 22358.7(a)(2):
• Lower Wyandotte Road (Segment 26) – Speed limit recommended at 35 MPH, n decrease from the existing 40 MPH.
• Orange Avenue (Segment 39) – Speed limit recommended at 35 MPH, a decrease from the existing 40 MPH.
158
Item 10.

City of Oroville 8
2026 Engineering and Traffic Survey
Speed Limits Assigned – CVC Section 22358.6(C) (6 Road Sections) The speed limits for the following six (6) roadway segments were assigned pursuant to CVC Section 22358.6(C), which allows the recommended speed limit that would typically be round up to be rounded down from the calculated 85th percentile speed to the nearest 5-mile-per-hour increment based on engineering judgment. • Feather River Boulevard (Segment 9) – Speed limit remains 35 MPH. • Fifth Avenue (Segment 11) – Speed limit remains 35 MPH. • Glen Drive (Segment 17) – Speed limit remains 35 MPH. • Larkin Road (Segment 21) – Speed limit is recommended at 55 MPH. This segment does not have an existing posted speed limit and will require installation of new speed limit signs.
• South 5th Avenue (Segment 46) – Speed limit remains 35 MPH. • Table Mountain Boulevard (Segment 49) – Speed limit recommended at 40 MPH, a decrease from the existing 45 MPH.

Speed Limits Assigned – CVC Section 22358.8(A) (11 Road Sections) The speed limits for the following 11 roadway segments were assigned pursuant to CVC Section 22358.8(A), which allows for retention of a previously adopted speed limit if that speed limit was established with an engineering and traffic survey and no general purpose lanes have been added to the roadway since completion of the traffic survey that established that speed limit.
• Foothill Boulevard (Segment 13) – Speed limit remains 35 MPH. • Foothill Boulevard (Segment 14) – Speed limit remains 40 MPH. • Grand Avenue (Segment 18) – Speed limit remains 35 MPH. • Lincoln Boulevard (Segment 24) – Speed limit remains 40 MPH. • Mitchell Avenue (Segment 27) – Speed limit remains 25 MPH. • Myers Street (Segment 31) – Speed limit remains 25 MPH. • Nelson Avenue (Segment 34) – Speed limit remains 35 MPH. • Ophir Road (Segment 36) – Speed limit remains 45 MPH. • Oro Quincy Highway (Segment 44) – Speed limit remains 30 MPH. • Table Mountain Boulevard (Segment 48) – Speed limit remains 35 MPH. • Washington Avenue (Segment 50) – Speed limit remains 25 MPH.

7.0 LOCAL ROADWAYS
CVC Section 40802(b)(1) states that a city may set a speed limit without the need of an E&TS if a road is classified as “Local” by the Caltrans Roadway Functional Classification System. Figure 4 illustrates all roads in the City of Oroville that are classified as “Local” by the Caltrans Roadway Functional Classification System. 159
Item 10.

City of Oroville 9
2026 Engineering and Traffic Survey

8.0 SUMMARY
An Engineering and Traffic Survey was completed for fifty-three (53) roadway segments within the City of Oroville using radar speed measurements collected in 2026. The survey results indicate that many roadway segments do not require a change to the existing posted speed limit. Where speed limit modifications are recommended, they are supported by this E&TS and comply with the California Vehicle Code and CA MUTCD.

Based on the 2026 Engineering and Traffic Survey, six (6) roadway segments require action with respect to posted speed limits. Of these, four (4) roadway segments require a change to the existing posted speed limit, and two (2) roadway segments require establishment of a new posted speed limit where none currently exists. • Garden Drive (Segment 15) – SR 70 to Table Mountain Boulevard - Establishment of a new posted speed limit of 45 MPH.
• Larkin Road (Segment 21) – City Limits to Oro Dam Boulevard - Establishment of a new posted speed limit of 55 MPH.
• Long Bar Road (Segment 25) – City Limits to Orange Avenue - Posted speed limit revised from 35 MPH to 30 MPH.
• Lower Wyandotte Road (Segment 26) – Olive Highway to Oro Garden Ranch Road - Posted speed limit revised from 40 MPH to 35 MPH. • Orange Avenue (Segment 39) – Long Bar Road to Oro Dam Boulevard - Posted speed limit revised from 40 MPH to 35 MPH.
• Table Mountain Boulevard (Segment 49) – Nelson Avenue to City Limits - Speed limit revised from 45 MPH to 40 MPH.

All remaining roadway segments evaluated as part of the 2026 Engineering and Traffic Survey are recommended to retain their existing posted speed limits or applicable prima facie speed limits.
160
Item 10.

Oroville
Junction
Thermalito Forebay
Nelson Ave
tate
Highway 70
Thermalito
Oroville
70 70
Oro Dam Blvd E
Oroville Dam Blvd W
State
Highway 70
Oro Dam Blvd W
Oroville
Municipal
Airport
162
Oro Quincy Hwy
Oroville East
Oliv e Hwy
Lincoln Blvd
Oakvale
Ave
Lincoln St
Mooretown
Rancheria
Berry Creek
Rancheria
South Oroville
#1
#2 #3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
#14
#15
#16
#17
#18
#20
#21
#22
#23
#24
#25
#26
#27
#28
#29
#30
#31
#32
#34 #35
#36
#37
#38
#39
#41
#42
#43
#44
#46
#47
#48
#49
#50
#51
#52
#33
#40
#19
#45
#53
Legend
E&TS Segment
E&TS Location
City Limits
2026 E&TS STUDY SEGMENTS

SPEED ZONE E&TS

OROVILLE, CA
JULY 2026
\\woodrodgers.loc\ProductionData\Jobs\Jobs\8206001_Oroville_Speed_Surveys\GIS\ArcGISPro\Oroville_Speed_Surveys\Oroville_Speed_Surveys_ETS_Study_Segments_Exhibit.aprx 4/21/2026 7:14 PM nfeyli FIGURE 1
NORTH
0 1,750 3,500
Feet
161
Item 10.
#1
#2 #3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
#14
#15
#16
#17
#18
#20
#21
#22
#23
#24
#25
#26
#27
#28
#29
#30
#31
#32
#34 #35
#36
#37
#38
#39
#41
#42
#43
#44
#46
#47
#48
#49
#50
#51
#52
#33
#40
#19
#45
#53
Legend
2026 Assigned Speed Limit
25 MPH
30 MPH
35 MPH
40 MPH
45 MPH
50 MPH
55 MPH
60 MPH
Survey Location
City Limits
2026 SPEED SURVEYS

SPEED ZONE E&TS

OROVILLE, CA
JULY 2026
J:\Jobs\8206001_Oroville_Speed_Surveys\GIS\ArcGISPro\Oroville_Speed_Surveys\Oroville_Speed_Surveys_Posted_Speeds_Exhibit.aprx 7/1/2026 4:50 PM mtambellini FIGURE 2
NORTH
0 1,750 3,500
Feet
162
Item 10.

Thermalito Forebay
Nelson Ave
16th St
20th St 20th St
18th St
Tehama Ave
Grand Ave
Feather Ave
Cre st Dr
Larkin Rd
Biggs Ave
18th
St
18th St
18th St
20th St
Crest Dr
Rabe R d
Oro Dam Blvd W
Mountain
Course
Clay Pit State
Vehicular
Recreation Area
Oroville
Municipal
Airport
Farrar Ln
Thermalito Forebay
Table Mountain
Blvd
Garden Dr
Mitchell Ave
Plumas Ave
Nelson Ave
Butte Ave
14th St
High St
7th St
2nd St
Thermalito Ave
Cherokee
Rd
Nelson Ave
State
Highway 70
State
Highway 70
State Highway 70
Thermalito
Oroville
70 Feather River Blv
d
Cal Oak Rd
Georgia Pacific Way
12th St
Wildlife Area Access
Rd
S 5th Ave
Baggett Marysville Rd
14th St
10th St
7th Av
e
Oro Dam Blvd E
State Highway 70
State Highway 70
Oro Dam Blvd W
Feather River
Bag
g
Ophir Rd
Pacific Heights R d
Fe
a
ht er R
vi er
Long B ar Rd
Valley View Dr
Orange Ave
Acacia Ave
Ya rd St
Foothill Blvd
Ashley Ave
Colina Way
Old
Ferry
Rd
Gold Ave
Almond
St
Oro Dam Blvd E
Cherokee
Rd
Olive Hwy
Olive Hwy
Myers
St
Foothill Blvd
Oak Knoll Way
Mesa Ave
Glen Ave
D St
Brookdale Dr
Ithaca St
Oro Garden Ranch Rd
V6 Rd
Monte Vista Ave
B St
Virginia Ave
Olive Hwy
Lincoln
B
vl d
Lincoln St
Oro
B
a
n
g
or Hwy
Oro Bangor Hw
Sou yth Oroville
Wheeler Ave
Ophir Rd
Mooretown
Rancheria
Feather River
Glen
Dr
Oro Quincy Hwy
Melrose
Dr
Greenbank Ave
Lo
ma Vista
Dr
Berry Creek
Rancheria
#1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
#14
#15
#16
#17
#18
#20
#21
#22
#23
#24
#25
#26
#27
#28
#29
#30
#31
#32
#34 #35
#36
#37
#38
#39
#41
#42
#43
#44
#46
#47
#48
#49
#50
#51
#52
#33
#40
#19
#45
#53
Legend
Data Collection Location
New E&TS Location
2010 E&TS Location
District Type
None
Business
Residential
City Limits

RESIDENTIAL AND BUSINESS

DISTRICTS

SPEED ZONE E&TS

OROVILLE, CA
JULY 2026
J:\Jobs\8206001_Oroville_Speed_Surveys\GIS\ArcGISPro\Oroville_Speed_Surveys\Oroville_Speed_Surveys_v2.aprx 7/1/2026 4:17 PM mtambellini FIGURE 3
NORTH
0 1,250 2,500
Feet
163
Item 10.

Oroville
Junction
Blvd W
ille Wildlife
Area
Thermalito Forebay
Nelson Ave
ate
Highway 70
Thermalito
Oroville
70 70
Oro Dam Blvd E
Oroville Dam Blvd W
State
Highway 70
Oro Dam Blvd W
Oroville
Municipal
Airport
162
Oro Quincy Hwy
Oroville East
Oliv e Hwy
Lincoln Blvd
Oakvale
Ave
Lincoln St
Mooretown
Rancheria
Berry Creek
Rancheria
South Oroville
Legend
City Limits
Caltrans Roadway
Functional Classification
Local

LOCAL ROADWAY

SEGMENTS

SPEED ZONE E&TS

OROVILLE, CA
JULY 2026
J:\Jobs\8206001_Oroville_Speed_Surveys\GIS\ArcGISPro\Oroville_Speed_Surveys\Oroville_Speed_Surveys_v2.aprx 4/30/2026 10:21 PM mtambellini FIGURE 4
NORTH
0 1,750 3,500
Feet
164
Item 10.

TABLE 1

CITY OF OROVILLE
2026 ENGINEERING AND TRAFFIC SURVEY SUMMARY
85th
Percentile
Speed (mph)
85th Percentile
Assignment
(mph)
Assigned
Speed (mph) Basis for Assignment
1 1 Bagget Marysville Road Georgia Pacific Way to Ophir Road 45 34 - 43 65 45 45 45 MUTCD Section 2B.13 2 2 Baldwin Myers Street to Yard Street 25 25 - 34 71 36 35 25 Residential or Business District - CVC Section 22352 (b) (1) 4 3 Boynton Avenue Bridge Street to Orange Avenue 25 25 - 34 86 33 35 25 Residential or Business District - CVC Section 22352 (b) (1) 5 4 Bridge Street Oro Dam Boulevard to Montgomery Street 25 23 - 32 77 33 35 25 Residential or Business District - CVC Section 22352 (b) (1) NA 5 Canyon Highlands Drive Oroville Quincy Highway to City Limits 25 28 - 37 74 36 35 25 Residential or Business District - CVC Section 22352 (b) (1) NA 6 Cherokee Road Table Mountain Road to City Limits 25 28 - 37 73 37 35 25 Residential or Business District - CVC Section 22352 (b) (1) NA 7 Eighteenth Street Oroville Dam Boulevard to Feather Avenue 25 23 - 32 79 32 30 25 Ped Safety - CVC Sec. 627(c)(2) 7 8 Feather River Boulevard Montgomery Street to Mitchell Avenue 35 30 - 39 83 38 40 35 Density - CVC Section 627(c)(1)(C) 8 9 Feather River Boulevard Mitchell Avenue to Oro Dam Boulevard 35 31 - 40 87 39 40 35 Round down - CVC Section 22358.6 (C) 9 10 Feather River Boulevard Oro Dam Boulevard to Georgia Pacific Way 45 37 - 46 70 46 45 45 MUTCD Section 2B.13 10 11 Fifth Avenue Mitchell Avenue to Oro Dam Boulevard 35 31 - 40 74 39 40 35 Round down - CVC Section 22358.6 (C) 11 12 Fifth Avenue Montgomery Street to Mitchell Avenue 25 24 - 33 85 32 30 25 Residential or Business District - CVC Section 22352 (b) (1) 13 13 Foothill Boulevard Olive Highway to City Limits 35 37 - 46 74 46 45 35 Retain Adopted Speed - CVC Section 22358.8 (A) 14 14 Foothill Boulevard Oro Quincy Highway to Olive Highway 40 34 - 43 72 45 45 40 Retain Adopted Speed - CVC Section 22358.8 (A) NA 15 Garden Drive SR 70 to Table Mountain Boulevard1 NA 36 - 45 79 45 45 45 MUTCD Section 2B.13 15 16 Georgia Pacific Way Hwy 70 to Bagget Marysville Road 45 33 - 42 67 44 45 45 MUTCD Section 2B.13 NA 17 Glen Drive Oroville Dam Boulevard to City Limits 35 29 - 38 78 38 40 35 Round down - CVC Section 22358.6 (C) 16 18 Grand Avenue 5th Street to Table Mountain Boulevard 35 34 - 43 77 44 45 35 Retain Adopted Speed - CVC Section 22358.8 (A) NA 19 Highlands Blvd Oro Dam Blvd E to Canyon Highlands Dr 25 21 - 30 71 30 30 25 Residential or Business District - CVC Section 22352 (b) (1) 17 20 Huntoon Street Montgomery Street to Lincoln Boulevard 25 20 - 29 80 30 30 25 Density - CVC Section 627(c)(1)(C) NA 21 Larkin Road City Limits to Oro Dam Boulevard NA 47 - 56 70 58 60 55 Round down - CVC Section 22358.6 (C) 19 22 Lincoln Street High Street to Montgomery Street 25 20 - 29 74 32 30 25 Density - CVC Section 627(c)(1)(C) 18 23 Lincoln Street High Street to Oro Dam Boulevard 30 27 - 36 79 36 35 30 Density - CVC Section 627(c)(1)(C) 20 24 Lincoln Boulevard Oro Dam Boulevard to City Limits 40 37 - 46 80 46 45 40 Retain Adopted Speed - CVC Section 22358.8 (A) NA 25 Long Bar Road City Limits to Orange Avenue 35 23 - 32 72 32 30 30 MUTCD Section 2B.13 NA 26 Lower Wyandotte Road Olive Highway to Oro Garden Ranch Road 40 37 - 46 90 45 45 35 Ped Safety & High Generators - CVC Sec. 627(c)(2) & 22358.7(a)(2) 21 27 Mitchell Avenue Veatch Street to Bridge Street 25 25 - 34 86 33 35 25 Retain Adopted Speed - CVC Section 22358.8 (A) 22 28 Mitchell Avenue Feather River Boulevard to Veatch Street 35 29 - 38 87 37 35 35 MUTCD Section 2B.13 23 29 Montgomery Street Feather River Boulevard to Washington Street 25 25 - 34 95 32 30 25 Residential or Business District - CVC Section 22352 (b) (1) 24 30 Montgomery Street Washington Avenue to Orange Avenue 25 33 - 42 80 41 40 25 Residential or Business District - CVC Section 22352 (b) (1) 25 31 Myers Street Montgomery Street to Oro Dam Boulevard 25 25 - 34 84 34 35 25 Retain Adopted Speed - CVC Section 22358.8 (A) 26 32 Myers Street Oro Dam Boulevard to Wyandotte Avenue 25 26 - 35 79 35 35 25 Residential or Business District - CVC Section 22352 (b) (1) NA 33 Myers Street Wyandotte Ave to Lincoln Blvd 25 25 - 34 79 35 35 25 Residential or Business District - CVC Section 22352 (b) (1) 27 34 Nelson Avenue Highway 70 to City Limits 35 34 - 43 76 43 45 35 Retain Adopted Speed - CVC Section 22358.8 (A) 28 35 Nelson Avenue Highway 70 to Table Mountain Boulevard 45 37 - 46 76 45 45 45 MUTCD Section 2B.13 29 36 Ophir Road City Limits to City Limits 45 45 - 54 82 54 55 45 Retain Adopted Speed - CVC Section 22358.8 (A) 30 37 Orange Avenue Washington Avenue to Montgomery Street 25 18 - 27 82 27 25 25 Residential or Business District - CVC Section 22352 (b) (1) 31 38 Orange Avenue Montgomery Street to Long Bar Road 25 29 - 38 74 40 40 25 Residential or Business District - CVC Section 22352 (b) (1) 32 39 Orange Avenue Long Bar Road to Oro Dam Boulevard 40 34 - 43 71 45 45 35 Ped Safety & High Generators - CVC Sec. 627(c)(2) & 22358.7(a)(2) NA 40 Oro Bangor Highway Lincoln Blvd to City Limits 25 26 - 35 69 38 40 25 Residential or Business District - CVC Section 22352 (b) (1) 33 41 Oro Dam Boulevard Olive Highway to Orange Avenue 40 29 - 38 77 39 40 40 MUTCD Section 2B.13 34 42 Oro Dam Boulevard Orange Avenue to Valley View Drive 40 36 - 45 70 45 45 40 Density - CVC Section 627(c)(1)(C) 35 43 Oro Dam Boulevard Valley View Drive to City Limits 45 36 - 45 69 47 45 45 MUTCD Section 2B.13 36 44 Oro Quincy Highway Oro Dam Boulevard to Foothill Boulevard 30 35 - 44 82 43 45 30 Retain Adopted Speed - CVC Section 22358.8 (A) NA 45 Spencer Avenue Baldwin Avenue to Oro Dam Boulevard East 25 17 - 26 89 25 25 25 MUTCD Section 2B.13 37 46 South 5th Avenue Oro Dam Boulevard to SC-OR 35 30 - 39 83 38 40 35 Round down - CVC Section 22358.6 (C) 38 47 South 5th Avenue SCOR to Georgia Pacific Way 45 38 - 47 62 47 45 45 MUTCD Section 2B.13 39 48 Table Mountain Boulevard Riverview Terrace to Nelson Avenue 35 31 - 40 80 40 40 35 Retain Adopted Speed - CVC Section 22358.8 (A) 40 49 Table Mountain Boulevard Nelson Avenue to City Limits 45 34 - 43 84 43 45 40 Round down - CVC Section 22358.6 (C) 42 50 Washington Avenue Montgomery Street to Mitchell Avenue 25 26 - 35 83 35 35 25 Retain Adopted Speed - CVC Section 22358.8 (A) 43 51 Washington Avenue Mitchell Avenue to Oro Dam Boulevard 25 23 - 32 90 31 30 25 Density - CVC Section 627(c)(1)(C) NA 52 Wyandotte Avenue Richter Avenue to Lower Wyandotte Road 25 25 - 34 80 34 35 25 Residential or Business District - CVC Section 22352 (b) (1) NA 53 Yard Street Bladwin Avenue to Washington Avenue 25 24 - 33 82 32 30 25 Residential or Business District - CVC Section 22352 (b) (1) %
Vehicles
in Pace
Determination of Assigned Speed
2010
Road
Segment
Number
2026
Road
Segment
Number Road Segment Name Segment From - To
Current
Posted
Speed
Limit (mph)
10 MPH
Pace
165
Item 10.

APPENDIX A

VEHICLE SPEED DATA SHEETS
166
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Baggett Marysville Rd Bet Georgia Pacific Way & Ophir Rd TIME: 14:30-15:20 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-001 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 29
30 3
31 32 3
33 1
34 6
35 3
36 2
37 2
38 4
39 2
40 6
41 2
42 4
43 44 2
45 3
46 2
47 1
48 1
49 1
50 51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 27 - 51 38 mph 45 mph 33 - 42 32 64% 14% / 7 22% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
167
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Baggett Marysville Rd Bet Georgia Pacific Way & Ophir Rd TIME: 14:30-15:20 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-001 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 29
30 2
31 32 3
33 1
34 1
35 3
36 6
37 1
38 2
39 5
40 5
41 3
42 5
43 3
44 2
45 3
46 2
47 48 1
49 50
51 52 1
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 27 - 52 39 mph 44 mph 35 - 44 35 70% 16% / 8 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
168
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Baggett Marysville Rd Bet Georgia Pacific Way & Ophir Rd TIME: 14:30-15:20 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-001 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 2
28 29
30 5
31 32 6
33 2
34 7
35 6
36 8
37 3
38 6
39 7
40 11
41 5
42 9
43 3
44 4
45 6
46 4
47 1
48 2
49 1
50 51 1
52 1
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 27 - 52 39 mph 45 mph 34 - 43 65 65% 15% / 15 20% / 20 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
169
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Baldwin Ave Bet Yard St & Myers St TIME: 12:00-13:40 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-002 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 3
26 2
27 3
28 6
29 4
30 9
31 3
32 1
33 3
34 2
35 6
36 1
37 2
38 39 1
40 1
41 42
43 1
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 24 - 44 30 mph 35 mph 26 - 35 39 78% 8% / 4 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
170
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Baldwin Ave Bet Yard St & Myers St TIME: 12:00-13:40 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-002 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 1
25 7
26 5
27 3
28 2
29 2
30 4
31 2
32 1
33 6
34 3
35 2
36 4
37 3
38 39
40 1
41 1
42 43 1
44 45
46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 23 - 46 30 mph 36 mph 25 - 34 35 70% 4% / 2 26% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
171
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Baldwin Ave Bet Yard St & Myers St TIME: 12:00-13:40 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-002 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 2
25 10
26 7
27 6
28 8
29 6
30 13
31 5
32 2
33 9
34 5
35 8
36 5
37 5
38 39 1
40 2
41 1
42 43 2
44 1
45 46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 23 - 46 30 mph 36 mph 25 - 34 71 71% 3% / 3 26% / 26 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
172
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Boynton Ave Bet Bridge St & Orange Ave/CR B2 TIME: 11:45-12:55 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-003 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 2
26 2
27 3
28 2
29 8
30 7
31 8
32 4
33 5
34 4
35 2
36 37 1
38 39 1
40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 40 31 mph 34 mph 25 - 34 45 90% 0% / 0 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
173
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Boynton Ave Bet Bridge St & Orange Ave/CR B2 TIME: 11:45-12:55 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-003 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 1
24 2
25 4
26 7
27 4
28 5
29 4
30 9
31 3
32 3
33 1
34 1
35 3
36 1
37 38 1
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 38 29 mph 32 mph 23 - 32 42 84% 2% / 1 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
174
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Boynton Ave Bet Bridge St & Orange Ave/CR B2 TIME: 11:45-12:55 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-003 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 1
24 2
25 6
26 9
27 7
28 7
29 12
30 16
31 11
32 7
33 6
34 5
35 5
36 1
37 1
38 1
39 1
40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 22 - 40 30 mph 33 mph 25 - 34 86 86% 4% / 4 10% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
175
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/30/2026 Location: Bridge St Bet Oroville Dam Blvd E & Montgomery St/CR B2 TIME: 09:00-10:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-004 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 7
24 3
25 4
26 5
27 3
28 5
29 2
30 4
31 1
32 3
33 5
34 2
35 2
36 37 2
38 1
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 38 28 mph 33 mph 23 - 32 37 74% 2% / 1 24% / 12 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
176
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/30/2026 Location: Bridge St Bet Oroville Dam Blvd E & Montgomery St/CR B2 TIME: 09:00-10:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-004 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20 1
21 1
22 2
23 3
24 2
25 7
26 3
27 5
28 7
29 4
30 5
31 2
32 2
33 1
34 4
35 36 1
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 20 - 36 28 mph 32 mph 22 - 31 40 80% 4% / 2 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
177
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/30/2026 Location: Bridge St Bet Oroville Dam Blvd E & Montgomery St/CR B2 TIME: 09:00-10:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-004 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20 1
21 1
22 3
23 10
24 5
25 11
26 8
27 8
28 12
29 6
30 9
31 3
32 5
33 6
34 6
35 2
36 1
37 2
38 1
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 20 - 38 28 mph 33 mph 23 - 32 77 77% 5% / 5 18% / 18 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
178
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/30/2026 Location: Canyon Highlands Dr Bet Valley View Dr & Oroville Quincy Hwy TIME: 10:10-12:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-005 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 1
24 1
25 2
26 2
27 2
28 4
29 2
30 2
31 3
32 2
33 5
34 3
35 3
36 2
37 3
38 2
39 1
40 41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 42 22 - 41 32 mph 37 mph 28 - 37 29 69% 21% / 9 10% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
179
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/30/2026 Location: Canyon Highlands Dr Bet Valley View Dr & Oroville Quincy Hwy TIME: 10:10-12:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-005 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 25
26 2
27 2
28 2
29 4
30 5
31 1
32 2
33 2
34 4
35 5
36 4
37 2
38 2
39 40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 39 23 - 40 33 mph 36 mph 27 - 36 31 79% 7% / 3 13% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
180
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/30/2026 Location: Canyon Highlands Dr Bet Valley View Dr & Oroville Quincy Hwy TIME: 10:10-12:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-005 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 2
24 1
25 2
26 4
27 4
28 6
29 6
30 7
31 4
32 4
33 7
34 7
35 8
36 6
37 5
38 4
39 1
40 1
41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 81 22 - 41 32 mph 36 mph 28 - 37 60 74% 17% / 14 9% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
181
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Cherokee Rd Bet Thompson Flat Rd & Table Mountain Blvd TIME: 09:00-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-006 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 3
26 2
27 1
28 2
29 1
30 6
31 4
32 4
33 3
34 2
35 2
36 1
37 1
38 2
39 40 1
41 42
43 1
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 37 25 - 44 31 mph 37 mph 25 - 34 28 76% 0% / 0 25% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
182
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Cherokee Rd Bet Thompson Flat Rd & Table Mountain Blvd TIME: 09:00-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-006 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 2
26 2
27 1
28 6
29 3
30 3
31 4
32 1
33 2
34 2
35 4
36 3
37 3
38 1
39 1
40 41
42 1
43 1
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 41 24 - 43 31 mph 37 mph 28 - 37 31 76% 14% / 6 10% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
183
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Cherokee Rd Bet Thompson Flat Rd & Table Mountain Blvd TIME: 09:00-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-006 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 5
26 4
27 2
28 8
29 4
30 9
31 8
32 5
33 5
34 4
35 6
36 4
37 4
38 3
39 1
40 1
41 42 1
43 2
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 78 24 - 44 31 mph 37 mph 28 - 37 57 73% 15% / 12 12% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
184
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: 18th St Bet Oro Dam Blvd W/SR 162 & Fresno Ave TIME: 10:00-12:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-007 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20 1
21 22
23 1
24 1
25 2
26 1
27 28 4
29 30 1
31 32 3
33 34 1
35 36 1
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 16 20 - 36 28 mph 32 mph 23 - 32 13 81% 6% / 1 13% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
185
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: 18th St Bet Oro Dam Blvd W/SR 162 & Fresno Ave TIME: 10:00-12:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-007 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18 1
19 20
21 22 1
23 24 1
25 26 2
27 28 2
29 30 2
31 1
32 1
33 34
35 1
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 12 18 - 35 28 mph 32 mph 22 - 31 9 75% 8% / 1 17% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4
Speed - MPH
Number of Vehicles
186
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: 18th St Bet Oro Dam Blvd W/SR 162 & Fresno Ave TIME: 10:00-12:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-007 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18 1
19 20 1
21 22 1
23 1
24 2
25 2
26 3
27 28 6
29 30 3
31 1
32 4
33 34 1
35 1
36 1
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 28 18 - 36 28 mph 32 mph 23 - 32 22 79% 10% / 3 11% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
187
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Feather River Blvd Bet Montgomery St/CR B2 & Mitchell Ave TIME: 11:00-12:45 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-008 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 1
26 2
27 1
28 29 2
30 3
31 4
32 3
33 4
34 8
35 10
36 7
37 4
38 5
39 3
40 3
41 42 2
43 1
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 63 25 - 43 35 mph 38 mph 30 - 39 51 81% 9% / 6 10% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
188
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Feather River Blvd Bet Montgomery St/CR B2 & Mitchell Ave TIME: 11:00-12:45 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-008 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 29 2
30 4
31 3
32 6
33 4
34 11
35 8
36 5
37 3
38 3
39 2
40 2
41 42 2
43 44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 57 27 - 44 34 mph 38 mph 29 - 38 49 86% 1% / 1 13% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
189
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Feather River Blvd Bet Montgomery St/CR B2 & Mitchell Ave TIME: 11:00-12:45 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-008 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 1
26 2
27 2
28 29 4
30 7
31 7
32 9
33 8
34 19
35 18
36 12
37 7
38 8
39 5
40 5
41 42 4
43 1
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 120 25 - 44 35 mph 38 mph 30 - 39 100 83% 7% / 9 10% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
190
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Feather River Blvd Bet Oroville Dam Blvd E/SR 162 & Mitchell Ave TIME: 09:00-10:50 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-009 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 2
32 4
33 10
34 7
35 9
36 5
37 3
38 5
39 4
40 3
41 3
42 2
43 44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 59 30 - 44 35 mph 40 mph 32 - 41 53 90% 5% / 3 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
191
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Feather River Blvd Bet Oroville Dam Blvd E/SR 162 & Mitchell Ave TIME: 09:00-10:50 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-009 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 2
30 1
31 3
32 3
33 7
34 11
35 8
36 4
37 5
38 3
39 4
40 3
41 2
42 2
43 1
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 60 28 - 43 35 mph 39 mph 31 - 40 51 85% 6% / 4 9% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
192
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Feather River Blvd Bet Oroville Dam Blvd E/SR 162 & Mitchell Ave TIME: 09:00-10:50 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-009 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 2
30 2
31 5
32 7
33 17
34 18
35 17
36 9
37 8
38 8
39 8
40 6
41 5
42 4
43 1
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 119 28 - 44 35 mph 39 mph 31 - 40 103 87% 4% / 5 10% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
193
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Feather River Blvd Bet Oroville Dam Blvd E/SR 162 & Georgia Pacific Way TIME: 09:00-10:00 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-010 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 2
34 2
35 36 3
37 4
38 3
39 3
40 5
41 2
42 2
43 5
44 4
45 3
46 5
47 5
48 1
49 50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 33 - 50 42 mph 46 mph 38 - 47 37 74% 22% / 11 4% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
194
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Feather River Blvd Bet Oroville Dam Blvd E/SR 162 & Georgia Pacific Way TIME: 09:00-10:00 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-010 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 1
34 2
35 3
36 2
37 3
38 2
39 2
40 3
41 4
42 4
43 3
44 4
45 7
46 2
47 1
48 1
49 2
50 51 1
52 1
53 54 1
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 32 - 54 42 mph 46 mph 36 - 45 34 68% 14% / 7 18% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
195
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Feather River Blvd Bet Oroville Dam Blvd E/SR 162 & Georgia Pacific Way TIME: 09:00-10:00 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-010 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 3
34 4
35 3
36 5
37 7
38 5
39 5
40 8
41 6
42 6
43 8
44 8
45 10
46 7
47 6
48 2
49 2
50 1
51 1
52 1
53 54 1
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 32 - 54 42 mph 46 mph 37 - 46 70 70% 16% / 16 14% / 14 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
196
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: 5th Ave Bet Oroville Dam Blvd E/SR 162 & Mitchell Ave TIME: 13:00-15:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-011 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 3
29 2
30 1
31 3
32 2
33 1
34 2
35 4
36 5
37 4
38 5
39 3
40 4
41 3
42 5
43 1
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 27 - 44 37 mph 41 mph 33 - 42 36 72% 24% / 12 4% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
197
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: 5th Ave Bet Oroville Dam Blvd E/SR 162 & Mitchell Ave TIME: 13:00-15:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-011 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 1
28 2
29 3
30 2
31 4
32 3
33 3
34 5
35 6
36 7
37 6
38 5
39 3
40 41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 52 26 - 41 35 mph 38 mph 29 - 38 44 85% 7% / 4 8% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
198
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: 5th Ave Bet Oroville Dam Blvd E/SR 162 & Mitchell Ave TIME: 13:00-15:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-011 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 2
28 5
29 5
30 3
31 7
32 5
33 4
34 7
35 10
36 12
37 10
38 10
39 6
40 4
41 4
42 5
43 1
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 102 26 - 44 36 mph 39 mph 31 - 40 75 74% 15% / 16 11% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
199
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: 5th Ave Bet Montgomery St/CR B2 & Mitchell Ave TIME: 09:15-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-012 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 2
22 1
23 2
24 1
25 5
26 7
27 3
28 6
29 8
30 5
31 3
32 4
33 2
34 1
35 2
36 37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 53 21 - 37 28 mph 32 mph 23 - 32 44 83% 5% / 3 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
200
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: 5th Ave Bet Montgomery St/CR B2 & Mitchell Ave TIME: 09:15-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-012 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 2
24 3
25 5
26 8
27 5
28 3
29 6
30 7
31 3
32 2
33 3
34 1
35 2
36 1
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 52 22 - 36 28 mph 32 mph 24 - 33 45 87% 5% / 3 8% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
201
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: 5th Ave Bet Montgomery St/CR B2 & Mitchell Ave TIME: 09:15-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-012 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 2
22 2
23 4
24 4
25 10
26 15
27 8
28 9
29 14
30 12
31 6
32 6
33 5
34 2
35 4
36 1
37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 105 21 - 37 28 mph 32 mph 24 - 33 89 85% 7% / 8 8% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
202
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Foothill Blvd Bet Mountain View Dr & Olive Hwy/SR 162 TIME: 14:50-15:20 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-013 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 30
31 32 1
33 1
34 3
35 1
36 2
37 3
38 2
39 3
40 8
41 5
42 4
43 2
44 1
45 3
46 3
47 1
48 1
49 50 2
51 1
52 1
53 54 1
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 28 - 54 40 mph 46 mph 37 - 46 34 68% 18% / 9 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
203
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Foothill Blvd Bet Mountain View Dr & Olive Hwy/SR 162 TIME: 14:50-15:20 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-013 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 34 1
35 36 2
37 3
38 4
39 3
40 4
41 3
42 6
43 4
44 10
45 1
46 2
47 48 4
49 2
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 32 - 49 42 mph 46 mph 36 - 45 40 80% 4% / 2 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
204
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Foothill Blvd Bet Mountain View Dr & Olive Hwy/SR 162 TIME: 14:50-15:20 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-013 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 30
31 32 2
33 1
34 4
35 1
36 4
37 6
38 6
39 6
40 12
41 8
42 10
43 6
44 11
45 4
46 5
47 1
48 5
49 2
50 2
51 1
52 1
53 54 1
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 28 - 54 41 mph 46 mph 37 - 46 74 74% 13% / 13 13% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
205
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Foothill Blvd Bet Oroville Quincy Hwy & Olive Hwy/SR 162 TIME: 13:15-14:15 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-014 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 1
30 31 1
32 1
33 1
34 5
35 3
36 6
37 3
38 3
39 4
40 5
41 2
42 1
43 4
44 45 5
46 1
47 48 3
49 1
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 29 - 49 39 mph 45 mph 34 - 43 36 72% 8% / 4 20% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
206
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Foothill Blvd Bet Oroville Quincy Hwy & Olive Hwy/SR 162 TIME: 13:15-14:15 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-014 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 1
32 1
33 1
34 5
35 4
36 3
37 2
38 4
39 4
40 2
41 5
42 4
43 3
44 3
45 3
46 1
47 48 1
49 50 2
51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 31 - 51 39 mph 45 mph 34 - 43 36 72% 6% / 3 22% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
207
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Foothill Blvd Bet Oroville Quincy Hwy & Olive Hwy/SR 162 TIME: 13:15-14:15 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-014 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 1
30 31 2
32 2
33 2
34 10
35 7
36 9
37 5
38 7
39 8
40 7
41 7
42 5
43 7
44 3
45 8
46 2
47 48 4
49 1
50 2
51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 29 - 51 39 mph 45 mph 34 - 43 72 72% 7% / 7 21% / 21 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
208
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Garden Dr Bet SR 70 & Table Mountain Blvd TIME: 11:10-13:10 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-015 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 1
34 3
35 2
36 3
37 5
38 3
39 7
40 6
41 5
42 3
43 2
44 4
45 3
46 3
47 2
48 49 1
50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 54 33 - 50 40 mph 45 mph 36 - 45 41 76% 11% / 6 13% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
209
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Garden Dr Bet SR 70 & Table Mountain Blvd TIME: 11:10-13:10 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-015 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34 2
35 1
36 3
37 2
38 5
39 3
40 7
41 5
42 4
43 5
44 4
45 3
46 2
47 1
48 2
49 50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 34 - 50 41 mph 45 mph 36 - 45 41 82% 6% / 3 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
210
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Garden Dr Bet SR 70 & Table Mountain Blvd TIME: 11:10-13:10 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-015 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 1
34 5
35 3
36 6
37 7
38 8
39 10
40 13
41 10
42 7
43 7
44 8
45 6
46 5
47 3
48 2
49 1
50 2
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 104 33 - 50 40 mph 45 mph 36 - 45 82 79% 8% / 9 13% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
211
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Georgia Pacific Way Bet SR 70 & Baggett Marysville Rd TIME: 12:25-13:55 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-016 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 1
32 2
33 2
34 3
35 3
36 5
37 2
38 4
39 2
40 3
41 2
42 5
43 1
44 3
45 5
46 4
47 1
48 49 1
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 49 39 mph 45 mph 36 - 45 32 64% 24% / 12 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
212
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Georgia Pacific Way Bet SR 70 & Baggett Marysville Rd TIME: 12:25-13:55 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-016 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 1
30 2
31 32 3
33 5
34 2
35 5
36 3
37 7
38 2
39 1
40 3
41 4
42 4
43 2
44 1
45 2
46 2
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 28 - 46 37 mph 42 mph 33 - 42 36 72% 14% / 7 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
213
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Georgia Pacific Way Bet SR 70 & Baggett Marysville Rd TIME: 12:25-13:55 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-016 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 1
30 3
31 1
32 5
33 7
34 5
35 8
36 8
37 9
38 6
39 3
40 6
41 6
42 9
43 3
44 4
45 7
46 6
47 1
48 49 1
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 28 - 49 38 mph 44 mph 33 - 42 67 67% 11% / 11 22% / 22 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
214
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Glen Dr Bet Sharp Rd & Oroville Dam Blvd E/SR 162 TIME: 12:00-14:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-017 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 1
26 1
27 28 2
29 1
30 2
31 32 4
33 1
34 4
35 3
36 3
37 4
38 3
39 2
40 41 1
42 43
44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 33 25 - 44 35 mph 38 mph 30 - 39 26 79% 15% / 5 7% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
215
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Glen Dr Bet Sharp Rd & Oroville Dam Blvd E/SR 162 TIME: 12:00-14:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-017 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 1
25 1
26 1
27 28 1
29 1
30 1
31 3
32 4
33 2
34 5
35 2
36 5
37 5
38 4
39 40 1
41 1
42 1
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 40 23 - 42 34 mph 38 mph 29 - 38 32 80% 12% / 5 8% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
216
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Glen Dr Bet Sharp Rd & Oroville Dam Blvd E/SR 162 TIME: 12:00-14:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-017 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 1
25 2
26 2
27 28 3
29 2
30 3
31 3
32 8
33 3
34 9
35 5
36 8
37 9
38 7
39 2
40 1
41 2
42 1
43 44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 73 23 - 44 34 mph 38 mph 29 - 38 57 78% 12% / 9 10% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
217
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Grand Ave Bet 5th St & Table Mountain Blvd TIME: 09:00-10:30 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-018 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 1
32 1
33 2
34 4
35 3
36 8
37 6
38 9
39 5
40 2
41 5
42 4
43 3
44 4
45 2
46 3
47 1
48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 66 30 - 48 38 mph 44 mph 34 - 43 49 74% 9% / 6 17% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
218
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Grand Ave Bet 5th St & Table Mountain Blvd TIME: 09:00-10:30 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-018 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 3
34 4
35 3
36 3
37 7
38 9
39 3
40 6
41 4
42 3
43 4
44 2
45 3
46 1
47 2
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 58 32 - 47 38 mph 43 mph 34 - 43 46 79% 6% / 4 14% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
219
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Grand Ave Bet 5th St & Table Mountain Blvd TIME: 09:00-10:30 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-018 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 1
32 2
33 5
34 8
35 6
36 11
37 13
38 18
39 8
40 8
41 9
42 7
43 7
44 6
45 5
46 4
47 3
48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 124 30 - 48 38 mph 44 mph 34 - 43 95 77% 8% / 10 16% / 19 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
220
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Highlands Blvd Bet Oro Dam Blvd E & Canyon Highlands Dr TIME: 09:00-10:20 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-019 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 1
17 1
18 3
19 4
20 3
21 3
22 3
23 3
24 4
25 5
26 4
27 3
28 3
29 3
30 2
31 3
32 33
34 1
35 1
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 16 - 35 24 mph 29 mph 18 - 27 35 70% 4% / 2 26% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
221
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Highlands Blvd Bet Oro Dam Blvd E & Canyon Highlands Dr TIME: 09:00-10:20 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-019 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 1
17 18 2
19 2
20 21 4
22 3
23 3
24 2
25 9
26 5
27 5
28 1
29 4
30 2
31 1
32 2
33 34 1
35 2
36 37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 16 - 37 25 mph 30 mph 21 - 30 38 76% 10% / 5 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
222
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Highlands Blvd Bet Oro Dam Blvd E & Canyon Highlands Dr TIME: 09:00-10:20 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-019 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 2
17 1
18 5
19 6
20 3
21 7
22 6
23 6
24 6
25 14
26 9
27 8
28 4
29 7
30 4
31 4
32 2
33 34 2
35 3
36 37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 16 - 37 25 mph 30 mph 21 - 30 71 71% 17% / 17 12% / 12 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
223
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Huntoon St Bet Montgomery St/CR B2 & Lincoln St TIME: 11:05-11:55 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-020 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 1
18 19 1
20 4
21 22 5
23 3
24 8
25 8
26 6
27 2
28 2
29 2
30 2
31 1
32 1
33 2
34 1
35 1
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 17 - 35 25 mph 30 mph 20 - 29 40 80% 4% / 2 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
224
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Huntoon St Bet Montgomery St/CR B2 & Lincoln St TIME: 11:05-11:55 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-020 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 0 0 - 0 0 mph 0 mph 990 - 999 0 #DIV/0! #DIV/0! #DIV/0! 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0
Speed - MPH
Number of Vehicles
225
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Huntoon St Bet Montgomery St/CR B2 & Lincoln St TIME: 11:05-11:55 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-020 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 1
18 19 1
20 4
21 22 5
23 3
24 8
25 8
26 6
27 2
28 2
29 2
30 2
31 1
32 1
33 2
34 1
35 1
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 17 - 35 25 mph 30 mph 20 - 29 40 80% 4% / 2 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
226
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Larkin Rd Bet Airport Pkwy & Oro Dam Blvd W/SR 162 TIME: 12:05-13:00 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-021 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 1
44 45 3
46 47 4
48 2
49 2
50 7
51 2
52 2
53 5
54 5
55 4
56 1
57 2
58 3
59 2
60 3
61 62 1
63 1
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 43 - 63 53 mph 58 mph 47 - 56 34 68% 8% / 4 24% / 12 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
227
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Larkin Rd Bet Airport Pkwy & Oro Dam Blvd W/SR 162 TIME: 12:05-13:00 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-021 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 1
38 39
40 41 1
42 1
43 44 1
45 2
46 47 3
48 4
49 3
50 6
51 5
52 4
53 4
54 2
55 3
56 2
57 1
58 5
59 2
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 37 - 59 51 mph 57 mph 47 - 56 36 72% 12% / 6 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
228
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/2/2026 Location: Larkin Rd Bet Airport Pkwy & Oro Dam Blvd W/SR 162 TIME: 12:05-13:00 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-021 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 1
38 39
40 41 1
42 1
43 1
44 1
45 5
46 47 7
48 6
49 5
50 13
51 7
52 6
53 9
54 7
55 7
56 3
57 3
58 8
59 4
60 3
61 62 1
63 1
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 37 - 63 52 mph 58 mph 47 - 56 70 70% 10% / 10 20% / 20 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
229
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Lincoln St Bet Montgomery St/CR B2 & High St TIME: 10:05-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-022 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 0 0 - 0 0 mph 0 mph 990 - 999 0 #DIV/0! #DIV/0! #DIV/0! 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0
Speed - MPH
Number of Vehicles
230
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Lincoln St Bet Montgomery St/CR B2 & High St TIME: 10:05-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-022 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20 3
21 22 5
23 3
24 3
25 9
26 6
27 2
28 2
29 4
30 1
31 2
32 5
33 1
34 2
35 1
36 1
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 20 - 36 26 mph 32 mph 20 - 29 37 74% 0% / 0 26% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
231
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Lincoln St Bet Montgomery St/CR B2 & High St TIME: 10:05-11:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-022 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20 3
21 22 5
23 3
24 3
25 9
26 6
27 2
28 2
29 4
30 1
31 2
32 5
33 1
34 2
35 1
36 1
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 20 - 36 26 mph 32 mph 20 - 29 37 74% 0% / 0 26% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
232
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Lincoln St Bet Oroville Dam Blvd E/SR 162 & High St TIME: 13:40-14:40 Posted Speed: 30 MPH Weather: Clear/Dry Project #: 26-100003-023 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 5
28 7
29 2
30 5
31 3
32 8
33 2
34 5
35 3
36 3
37 1
38 1
39 40 1
41 1
42 1
43 44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 26 - 44 32 mph 36 mph 27 - 36 43 86% 2% / 1 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
233
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Lincoln St Bet Oroville Dam Blvd E/SR 162 & High St TIME: 13:40-14:40 Posted Speed: 30 MPH Weather: Clear/Dry Project #: 26-100003-023 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 2
26 2
27 2
28 3
29 2
30 4
31 2
32 7
33 3
34 2
35 7
36 4
37 2
38 2
39 1
40 1
41 2
42 1
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 24 - 42 32 mph 37 mph 27 - 36 36 72% 10% / 5 18% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
234
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Lincoln St Bet Oroville Dam Blvd E/SR 162 & High St TIME: 13:40-14:40 Posted Speed: 30 MPH Weather: Clear/Dry Project #: 26-100003-023 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 2
26 3
27 7
28 10
29 4
30 9
31 5
32 15
33 5
34 7
35 10
36 7
37 3
38 3
39 1
40 2
41 3
42 2
43 44 1
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 24 - 44 32 mph 36 mph 27 - 36 79 79% 6% / 6 15% / 15 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
235
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Lincoln St Bet Oroville Dam Blvd E/SR 162 & Greenville St TIME: 12:45-13:20 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-024 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 3
36 2
37 2
38 6
39 3
40 2
41 4
42 6
43 4
44 8
45 46 4
47 2
48 1
49 1
50 1
51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 35 - 51 42 mph 46 mph 35 - 44 40 80% 0% / 0 20% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
236
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Lincoln St Bet Oroville Dam Blvd E/SR 162 & Greenville St TIME: 12:45-13:20 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-024 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 1
36 3
37 4
38 2
39 3
40 4
41 5
42 4
43 7
44 6
45 3
46 3
47 2
48 1
49 2
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 35 - 49 42 mph 46 mph 36 - 45 41 82% 2% / 1 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
237
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Lincoln St Bet Oroville Dam Blvd E/SR 162 & Greenville St TIME: 12:45-13:20 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-024 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 4
36 5
37 6
38 8
39 6
40 6
41 9
42 10
43 11
44 14
45 3
46 7
47 4
48 2
49 3
50 1
51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 35 - 51 42 mph 46 mph 37 - 46 80 80% 9% / 9 11% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
238
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Long Bar Rd Bet Canyon Highlands Dr & Orange Ave/CR B2 TIME: 10:25-11:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-025 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 2
16 3
17 18 1
19 2
20 21 6
22 23 4
24 3
25 4
26 4
27 2
28 29 7
30 4
31 1
32 4
33 34
35 36 1
37 2
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 15 - 37 25 mph 31 mph 21 - 30 34 68% 16% / 8 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
239
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Long Bar Rd Bet Canyon Highlands Dr & Orange Ave/CR B2 TIME: 10:25-11:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-025 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 1
17 18 1
19 1
20 21 2
22 23 3
24 3
25 5
26 2
27 5
28 2
29 5
30 7
31 3
32 4
33 34 4
35 1
36 37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 16 - 37 28 mph 32 mph 23 - 32 39 78% 10% / 5 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
240
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Long Bar Rd Bet Canyon Highlands Dr & Orange Ave/CR B2 TIME: 10:25-11:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-025 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 2
16 4
17 18 2
19 3
20 21 8
22 23 7
24 6
25 9
26 6
27 7
28 2
29 12
30 11
31 4
32 8
33 34 4
35 1
36 1
37 3
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 15 - 37 27 mph 32 mph 23 - 32 72 72% 19% / 19 9% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
241
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Lower Wyandotte Rd Bet Olive Hwy/SR 162 & Oro Garden Ranch Rd TIME: 14:05-14:40 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-026 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 34
35 36 1
37 3
38 3
39 4
40 8
41 5
42 4
43 8
44 5
45 3
46 1
47 1
48 2
49 50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 32 - 50 41 mph 45 mph 36 - 45 44 88% 2% / 1 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
242
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Lower Wyandotte Rd Bet Olive Hwy/SR 162 & Oro Garden Ranch Rd TIME: 14:05-14:40 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-026 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38 4
39 5
40 6
41 5
42 10
43 5
44 4
45 3
46 4
47 1
48 2
49 1
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 38 - 49 42 mph 46 mph 38 - 47 47 94% 0% / 0 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
243
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: Lower Wyandotte Rd Bet Olive Hwy/SR 162 & Oro Garden Ranch Rd TIME: 14:05-14:40 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-026 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 34
35 36 1
37 3
38 7
39 9
40 14
41 10
42 14
43 13
44 9
45 6
46 5
47 2
48 4
49 1
50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 32 - 50 42 mph 45 mph 37 - 46 90 90% 2% / 2 8% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
244
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/27/2026 Location: Mitchell Ave Bet Bridge St & Veatch St TIME: 14:45-15:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-027 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 3
25 3
26 7
27 7
28 6
29 6
30 4
31 3
32 1
33 2
34 4
35 3
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 35 28 mph 33 mph 25 - 34 43 86% 8% / 4 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
245
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/27/2026 Location: Mitchell Ave Bet Bridge St & Veatch St TIME: 14:45-15:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-027 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 2
25 3
26 4
27 3
28 6
29 5
30 5
31 8
32 4
33 3
34 2
35 1
36 2
37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 37 30 mph 33 mph 24 - 33 43 86% 2% / 1 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
246
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/27/2026 Location: Mitchell Ave Bet Bridge St & Veatch St TIME: 14:45-15:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-027 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 2
23 24 5
25 6
26 11
27 10
28 12
29 11
30 9
31 11
32 5
33 5
34 6
35 4
36 2
37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 22 - 37 29 mph 33 mph 25 - 34 86 86% 7% / 7 7% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
247
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Mitchell Ave Bet Feather River Blvd & Veatch St TIME: 14:30-16:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-028 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 2
28 2
29 1
30 3
31 7
32 9
33 5
34 6
35 7
36 3
37 4
38 3
39 1
40 2
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 56 26 - 40 33 mph 37 mph 29 - 38 48 86% 8% / 5 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
248
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Mitchell Ave Bet Feather River Blvd & Veatch St TIME: 14:30-16:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-028 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 2
29 3
30 4
31 3
32 9
33 6
34 4
35 11
36 5
37 4
38 3
39 3
40 41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 59 27 - 41 34 mph 37 mph 29 - 38 52 88% 5% / 3 7% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
249
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Mitchell Ave Bet Feather River Blvd & Veatch St TIME: 14:30-16:00 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-028 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 3
28 4
29 4
30 7
31 10
32 18
33 11
34 10
35 18
36 8
37 8
38 6
39 4
40 2
41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 115 26 - 41 33 mph 37 mph 29 - 38 100 87% 6% / 8 7% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
250
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Montgomery St/CR B2 Bet Feather River Blvd & Washington Ave/Table Mountain Blvd TIME: 09:00-10:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-029 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 2
25 7
26 5
27 4
28 7
29 3
30 9
31 3
32 4
33 1
34 3
35 36 1
37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 24 - 37 28 mph 32 mph 25 - 34 46 92% 4% / 2 4% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
251
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Montgomery St/CR B2 Bet Feather River Blvd & Washington Ave/Table Mountain Blvd TIME: 09:00-10:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-029 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 2
26 3
27 5
28 5
29 7
30 10
31 6
32 6
33 3
34 2
35 1
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 35 30 mph 32 mph 25 - 34 49 98% 0% / 0 2% / 1 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
252
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Montgomery St/CR B2 Bet Feather River Blvd & Washington Ave/Table Mountain Blvd TIME: 09:00-10:00 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-029 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 2
25 9
26 8
27 9
28 12
29 10
30 19
31 9
32 10
33 4
34 5
35 1
36 1
37 1
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 24 - 37 29 mph 32 mph 25 - 34 95 95% 2% / 2 3% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
253
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Montgomery St/CR B2 Bet Orange Ave/CR B2 & Washington Ave/Table Mountain Bl TIME: 14:15-14:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-030 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32 3
33 6
34 3
35 2
36 6
37 7
38 4
39 3
40 5
41 3
42 1
43 3
44 1
45 1
46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 46 37 mph 41 mph 32 - 41 42 84% 2% / 1 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
254
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Montgomery St/CR B2 Bet Orange Ave/CR B2 & Washington Ave/Table Mountain Bl TIME: 14:15-14:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-030 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 3
32 1
33 2
34 3
35 5
36 6
37 5
38 6
39 1
40 5
41 3
42 4
43 2
44 1
45 1
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 45 37 mph 42 mph 33 - 42 40 80% 12% / 6 8% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
255
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Montgomery St/CR B2 Bet Orange Ave/CR B2 & Washington Ave/Table Mountain Bl TIME: 14:15-14:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-030 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 3
31 3
32 4
33 8
34 6
35 7
36 12
37 12
38 10
39 4
40 10
41 6
42 5
43 5
44 2
45 2
46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 30 - 46 37 mph 41 mph 33 - 42 80 80% 10% / 10 10% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
256
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Myers St Bet Montgomery St/CR B2 & Oro Dam Blvd E/SR 162 TIME: 12:40-13:30 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-031 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 3
26 6
27 3
28 5
29 3
30 8
31 7
32 6
33 4
34 2
35 1
36 1
37 38
39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 39 30 mph 33 mph 25 - 34 47 94% 0% / 0 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
257
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Myers St Bet Montgomery St/CR B2 & Oro Dam Blvd E/SR 162 TIME: 12:40-13:30 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-031 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 2
25 4
26 2
27 2
28 5
29 2
30 5
31 3
32 6
33 3
34 5
35 1
36 4
37 4
38 39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 23 - 39 31 mph 36 mph 28 - 37 38 76% 22% / 11 2% / 1 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
258
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/27/2026 Location: Myers St Bet Montgomery St/CR B2 & Oro Dam Blvd E/SR 162 TIME: 12:40-13:30 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-031 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 2
25 7
26 8
27 5
28 10
29 5
30 13
31 10
32 12
33 7
34 7
35 2
36 5
37 4
38 39 2
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 23 - 39 30 mph 34 mph 25 - 34 84 84% 3% / 3 13% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
259
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Myers St Bet Wyandotte Ave & Oro Dam Blvd E/SR 162 TIME: 10:30-11:25 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-032 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 1
25 3
26 4
27 5
28 5
29 3
30 5
31 2
32 4
33 3
34 2
35 4
36 3
37 2
38 2
39 40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 40 30 mph 36 mph 26 - 35 37 74% 10% / 5 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
260
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Myers St Bet Wyandotte Ave & Oro Dam Blvd E/SR 162 TIME: 10:30-11:25 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-032 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 1
25 1
26 3
27 2
28 1
29 8
30 4
31 4
32 6
33 7
34 4
35 3
36 2
37 1
38 39 1
40 41
42 1
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 23 - 42 31 mph 35 mph 26 - 35 42 84% 6% / 3 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
261
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Myers St Bet Wyandotte Ave & Oro Dam Blvd E/SR 162 TIME: 10:30-11:25 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-032 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 1
24 2
25 4
26 7
27 7
28 6
29 11
30 9
31 6
32 10
33 10
34 6
35 7
36 5
37 3
38 2
39 1
40 1
41 42 1
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 22 - 42 31 mph 35 mph 26 - 35 79 79% 8% / 8 13% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
262
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Myers St Bet Wyandotte Ave & Lincoln St TIME: 11:35-12:40 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-033 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 4
26 3
27 4
28 5
29 4
30 5
31 4
32 5
33 2
34 3
35 3
36 3
37 38 1
39 2
40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 24 - 40 30 mph 35 mph 25 - 34 39 78% 2% / 1 20% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
263
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Myers St Bet Wyandotte Ave & Lincoln St TIME: 11:35-12:40 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-033 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 3
25 4
26 5
27 3
28 7
29 2
30 4
31 1
32 6
33 4
34 4
35 1
36 2
37 1
38 39 1
40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 40 29 mph 34 mph 25 - 34 40 80% 8% / 4 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
264
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/26/2026 Location: Myers St Bet Wyandotte Ave & Lincoln St TIME: 11:35-12:40 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-033 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 4
25 8
26 8
27 7
28 12
29 6
30 9
31 5
32 11
33 6
34 7
35 4
36 5
37 1
38 1
39 3
40 2
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 22 - 40 30 mph 35 mph 25 - 34 79 79% 5% / 5 16% / 16 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
265
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Nelson Ave Bet 16th St & SR 70 TIME: 13:00-14:25 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-034 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 2
32 2
33 3
34 2
35 2
36 2
37 4
38 5
39 5
40 6
41 4
42 2
43 3
44 2
45 2
46 1
47 1
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 47 39 mph 43 mph 32 - 41 35 70% 8% / 4 22% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
266
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Nelson Ave Bet 16th St & SR 70 TIME: 13:00-14:25 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-034 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 1
34 3
35 2
36 3
37 3
38 5
39 2
40 6
41 7
42 6
43 4
44 3
45 2
46 1
47 1
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 32 - 47 40 mph 43 mph 34 - 43 41 82% 4% / 2 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
267
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Nelson Ave Bet 16th St & SR 70 TIME: 13:00-14:25 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-034 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 2
32 3
33 4
34 5
35 4
36 5
37 7
38 10
39 7
40 12
41 11
42 8
43 7
44 5
45 4
46 2
47 2
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 30 - 47 40 mph 43 mph 34 - 43 76 76% 11% / 11 13% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
268
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Nelson Ave Bet Table Mountain Blvd & SR 70 TIME: 11:10-12:55 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-035 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 34 2
35 3
36 2
37 3
38 3
39 7
40 6
41 7
42 3
43 5
44 6
45 4
46 3
47 1
48 2
49 1
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 59 32 - 49 41 mph 45 mph 37 - 46 47 80% 13% / 8 7% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
269
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Nelson Ave Bet Table Mountain Blvd & SR 70 TIME: 11:10-12:55 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-035 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32
33 1
34 2
35 3
36 3
37 2
38 4
39 3
40 5
41 6
42 7
43 6
44 3
45 5
46 3
47 2
48 2
49 1
50 51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 60 30 - 51 41 mph 45 mph 36 - 45 44 73% 11% / 7 15% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
270
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/29/2026 Location: Nelson Ave Bet Table Mountain Blvd & SR 70 TIME: 11:10-12:55 Posted Speed: None Weather: Clear/Dry Project #: 26-100003-035 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32 1
33 1
34 4
35 6
36 5
37 5
38 7
39 10
40 11
41 13
42 10
43 11
44 9
45 9
46 6
47 3
48 4
49 2
50 51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 119 30 - 51 41 mph 45 mph 37 - 46 91 76% 15% / 18 9% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
271
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/27/2026 Location: Ophir Rd Bet Lincoln Blvd & SR 70 TIME: 11:50-12:25 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-036 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40 1
41 42 1
43 1
44 1
45 4
46 4
47 3
48 4
49 6
50 4
51 5
52 5
53 2
54 3
55 56 3
57 1
58 59 1
60 1
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 40 - 60 49 mph 54 mph 45 - 54 40 80% 8% / 4 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
272
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/27/2026 Location: Ophir Rd Bet Lincoln Blvd & SR 70 TIME: 11:50-12:25 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-036 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 1
44 1
45 2
46 3
47 5
48 7
49 3
50 9
51 2
52 5
53 3
54 3
55 1
56 2
57 1
58 1
59 60 1
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 43 - 60 50 mph 54 mph 45 - 54 42 84% 4% / 2 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
273
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/27/2026 Location: Ophir Rd Bet Lincoln Blvd & SR 70 TIME: 11:50-12:25 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-036 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40 1
41 42 1
43 2
44 2
45 6
46 7
47 8
48 11
49 9
50 13
51 7
52 10
53 5
54 6
55 1
56 5
57 2
58 1
59 1
60 2
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 40 - 60 50 mph 54 mph 45 - 54 82 82% 6% / 6 12% / 12 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
274
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Washington Ave & Montgomery St/CR B2 TIME: 12:35-14:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-037 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 2
17 18 5
19 4
20 8
21 4
22 3
23 3
24 5
25 3
26 4
27 2
28 3
29 2
30 1
31 32 1
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 16 - 32 22 mph 27 mph 18 - 27 41 82% 4% / 2 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
275
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Washington Ave & Montgomery St/CR B2 TIME: 12:35-14:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-037 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 0 0 - 0 0 mph 0 mph 990 - 999 0 #DIV/0! #DIV/0! #DIV/0! 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0
Speed - MPH
Number of Vehicles
276
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Washington Ave & Montgomery St/CR B2 TIME: 12:35-14:10 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-037 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 2
17 18 5
19 4
20 8
21 4
22 3
23 3
24 5
25 3
26 4
27 2
28 3
29 2
30 1
31 32 1
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 16 - 32 22 mph 27 mph 18 - 27 41 82% 4% / 2 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
277
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Long Bar Rd & Montgomery St/CR B2 TIME: 09:45-10:20 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-038 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 1
26 1
27 28
29 3
30 3
31 1
32 4
33 8
34 2
35 5
36 3
37 3
38 4
39 3
40 2
41 1
42 2
43 1
44 1
45 46 1
47 1
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 47 35 mph 40 mph 29 - 38 36 72% 4% / 2 24% / 12 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
278
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Long Bar Rd & Montgomery St/CR B2 TIME: 09:45-10:20 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-038 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 2
26 27
28 29 1
30 31 3
32 7
33 4
34 9
35 5
36 5
37 2
38 2
39 1
40 1
41 3
42 1
43 1
44 45 1
46 1
47 48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 48 34 mph 41 mph 31 - 40 39 78% 6% / 3 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
279
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Long Bar Rd & Montgomery St/CR B2 TIME: 09:45-10:20 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-038 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 3
26 1
27 28
29 4
30 3
31 4
32 11
33 12
34 11
35 10
36 8
37 5
38 6
39 4
40 3
41 4
42 3
43 2
44 1
45 1
46 2
47 1
48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 25 - 48 35 mph 40 mph 29 - 38 74 74% 4% / 4 22% / 22 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
280
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Oroville Dam Blvd E & Long Bar Rd TIME: 11:00-11:35 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-039 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 1
26 27 1
28 29
30 31 3
32 2
33 34 1
35 4
36 1
37 6
38 5
39 5
40 4
41 2
42 3
43 5
44 45
46 1
47 2
48 2
49 1
50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 50 39 mph 43 mph 34 - 43 36 72% 14% / 7 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
281
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Oroville Dam Blvd E & Long Bar Rd TIME: 11:00-11:35 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-039 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 1
32 2
33 1
34 3
35 3
36 6
37 4
38 2
39 3
40 6
41 6
42 2
43 44 1
45 2
46 2
47 1
48 49 1
50 2
51 1
52 53 1
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 31 - 53 39 mph 46 mph 32 - 41 36 72% 2% / 1 26% / 13 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
282
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/3/2026 Location: Orange Ave/CR B2 Bet Oroville Dam Blvd E & Long Bar Rd TIME: 11:00-11:35 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-039 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 1
26 27 1
28 29
30 31 4
32 4
33 1
34 4
35 7
36 7
37 10
38 7
39 8
40 10
41 8
42 5
43 5
44 1
45 2
46 3
47 3
48 2
49 2
50 3
51 1
52 53 1
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 25 - 53 39 mph 45 mph 34 - 43 71 71% 11% / 11 18% / 18 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
283
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/26/2026 Location: Oro Bangor Hwy Bet Burlington Ave & Lincoln St TIME: 09:00-10:15 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-040 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 1
25 1
26 4
27 3
28 5
29 1
30 7
31 5
32 5
33 4
34 1
35 3
36 2
37 38 1
39 40 1
41 3
42 2
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 42 31 mph 36 mph 26 - 35 38 76% 6% / 3 18% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
284
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/26/2026 Location: Oro Bangor Hwy Bet Burlington Ave & Lincoln St TIME: 09:00-10:15 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-040 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 3
26 1
27 2
28 2
29 1
30 3
31 2
32 6
33 6
34 3
35 5
36 3
37 3
38 3
39 2
40 1
41 3
42 43 1
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 43 33 mph 38 mph 30 - 39 36 72% 18% / 9 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
285
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/26/2026 Location: Oro Bangor Hwy Bet Burlington Ave & Lincoln St TIME: 09:00-10:15 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-040 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 24 1
25 4
26 5
27 5
28 7
29 2
30 10
31 7
32 11
33 10
34 4
35 8
36 5
37 3
38 4
39 2
40 2
41 6
42 2
43 1
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 22 - 43 32 mph 38 mph 26 - 35 69 69% 6% / 6 25% / 25 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
286
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Oro Dam Blvd E Bet Orange Ave/CR B2 & Olive Hwy/Washington Ave/SR 162 TIME: 09:00-09:40 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-041 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 1
29 4
30 3
31 7
32 4
33 4
34 5
35 7
36 4
37 1
38 3
39 2
40 1
41 42
43 2
44 1
45 1
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 28 - 45 34 mph 38 mph 29 - 38 42 84% 2% / 1 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
287
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Oro Dam Blvd E Bet Orange Ave/CR B2 & Olive Hwy/Washington Ave/SR 162 TIME: 09:00-09:40 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-041 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 2
29 1
30 6
31 3
32 3
33 2
34 5
35 4
36 3
37 3
38 5
39 3
40 2
41 1
42 1
43 44 3
45 2
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 27 - 45 35 mph 40 mph 30 - 39 37 74% 8% / 4 18% / 9 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
288
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Oro Dam Blvd E Bet Orange Ave/CR B2 & Olive Hwy/Washington Ave/SR 162 TIME: 09:00-09:40 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-041 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 1
28 3
29 5
30 9
31 10
32 7
33 6
34 10
35 11
36 7
37 4
38 8
39 5
40 3
41 1
42 1
43 2
44 4
45 3
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 27 - 45 34 mph 39 mph 29 - 38 77 77% 4% / 4 19% / 19 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
289
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/4/2026 Location: Oro Dam Blvd E/CR B2 Bet Orange Ave/CR B2 & Valley View Dr TIME: 11:45-12:15 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-042 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 1
32 1
33 1
34 1
35 4
36 5
37 4
38 2
39 3
40 9
41 2
42 4
43 2
44 3
45 5
46 1
47 48
49 1
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 49 40 mph 44 mph 36 - 45 39 78% 18% / 9 4% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
290
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/4/2026 Location: Oro Dam Blvd E/CR B2 Bet Orange Ave/CR B2 & Valley View Dr TIME: 11:45-12:15 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-042 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32
33 1
34 2
35 2
36 3
37 1
38 3
39 2
40 4
41 4
42 6
43 2
44 3
45 3
46 6
47 3
48 2
49 1
50 51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 51 42 mph 46 mph 38 - 47 36 72% 20% / 10 8% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
291
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/4/2026 Location: Oro Dam Blvd E/CR B2 Bet Orange Ave/CR B2 & Valley View Dr TIME: 11:45-12:15 Posted Speed: 40 MPH Weather: Clear/Dry Project #: 26-100003-042 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 1
32 1
33 2
34 3
35 6
36 8
37 5
38 5
39 5
40 13
41 6
42 10
43 4
44 6
45 8
46 7
47 3
48 2
49 2
50 51 1
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 30 - 51 40 mph 45 mph 36 - 45 70 70% 15% / 15 15% / 15 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
292
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/4/2026 Location: Oro Dam Blvd E/CR B2 Bet Glen Dr & Valley View Dr TIME: 12:55-14:00 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-043 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32 1
33 34 1
35 2
36 2
37 3
38 6
39 2
40 5
41 2
42 3
43 2
44 5
45 3
46 3
47 4
48 2
49 2
50 1
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 50 41 mph 47 mph 38 - 47 35 70% 20% / 10 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
293
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/4/2026 Location: Oro Dam Blvd E/CR B2 Bet Glen Dr & Valley View Dr TIME: 12:55-14:00 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-043 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36 3
37 5
38 3
39 4
40 7
41 2
42 3
43 4
44 3
45 2
46 2
47 3
48 3
49 2
50 2
51 1
52 1
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 36 - 52 42 mph 48 mph 36 - 45 36 72% 0% / 0 28% / 14 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
294
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 2/4/2026 Location: Oro Dam Blvd E/CR B2 Bet Glen Dr & Valley View Dr TIME: 12:55-14:00 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-043 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32 1
33 34 1
35 2
36 5
37 8
38 9
39 6
40 12
41 4
42 6
43 6
44 8
45 5
46 5
47 7
48 5
49 4
50 3
51 1
52 1
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 30 - 52 42 mph 47 mph 36 - 45 69 69% 5% / 5 26% / 26 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
295
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/30/2026 Location: Oroville Quincy Hwy Bet Oroville Quincy Hwy/SR 162/Olive Hwy & Oro Dam Blvd E TIME: 12:20-12:50 Posted Speed: 30 MPH Weather: Clear/Dry Project #: 26-100003-044 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 1
30 1
31 32 2
33 3
34 1
35 5
36 3
37 4
38 6
39 6
40 3
41 4
42 1
43 5
44 3
45 1
46 47 1
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 29 - 47 38 mph 43 mph 35 - 44 40 80% 16% / 8 4% / 2 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
296
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/30/2026 Location: Oroville Quincy Hwy Bet Oroville Quincy Hwy/SR 162/Olive Hwy & Oro Dam Blvd E TIME: 12:20-12:50 Posted Speed: 30 MPH Weather: Clear/Dry Project #: 26-100003-044 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32
33 2
34 2
35 4
36 6
37 5
38 6
39 3
40 5
41 3
42 5
43 2
44 3
45 1
46 47 1
48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 48 38 mph 43 mph 35 - 44 42 84% 10% / 5 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
297
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/30/2026 Location: Oroville Quincy Hwy Bet Oroville Quincy Hwy/SR 162/Olive Hwy & Oro Dam Blvd E TIME: 12:20-12:50 Posted Speed: 30 MPH Weather: Clear/Dry Project #: 26-100003-044 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 1
30 2
31 32 2
33 5
34 3
35 9
36 9
37 9
38 12
39 9
40 8
41 7
42 6
43 7
44 6
45 2
46 47 2
48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 29 - 48 38 mph 43 mph 35 - 44 82 82% 13% / 13 5% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
298
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Spencer Ave Bet Baldwin Ave & Oro Dam Blvd E/SR 162 TIME: 10:30-12:30 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-045 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 1
17 1
18 1
19 1
20 2
21 1
22 3
23 1
24 3
25 3
26 1
27 28
29 1
30 31
32 1
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 20 16 - 32 22 mph 25 mph 16 - 25 17 85% 0% / 0 15% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4
Speed - MPH
Number of Vehicles
299
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Spencer Ave Bet Baldwin Ave & Oro Dam Blvd E/SR 162 TIME: 10:30-12:30 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-045 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18 2
19 20 3
21 1
22 2
23 3
24 2
25 1
26 1
27 28 1
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 16 18 - 28 22 mph 25 mph 17 - 26 15 94% 0% / 0 7% / 1 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4
Speed - MPH
Number of Vehicles
300
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Spencer Ave Bet Baldwin Ave & Oro Dam Blvd E/SR 162 TIME: 10:30-12:30 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-045 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16 1
17 1
18 3
19 1
20 5
21 2
22 5
23 4
24 5
25 4
26 2
27 28 1
29 1
30 31
32 1
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 36 16 - 32 22 mph 25 mph 17 - 26 32 89% 2% / 1 9% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10
Speed - MPH
Number of Vehicles
301
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: S 5th Ave Bet Sewerage Commission Oroville Dwy & Oro Dam Blvd E/SR 162 TIME: 11:25-12:20 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-046 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 2
27 2
28 2
29 1
30 5
31 4
32 3
33 6
34 5
35 3
36 2
37 7
38 3
39 2
40 2
41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 26 - 41 33 mph 38 mph 30 - 39 40 80% 14% / 7 6% / 3 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
302
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: S 5th Ave Bet Sewerage Commission Oroville Dwy & Oro Dam Blvd E/SR 162 TIME: 11:25-12:20 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-046 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 2
31 2
32 4
33 4
34 8
35 10
36 3
37 4
38 4
39 2
40 1
41 3
42 1
43 44 1
45 46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 46 35 mph 39 mph 30 - 39 43 86% 0% / 0 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
303
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: S 5th Ave Bet Sewerage Commission Oroville Dwy & Oro Dam Blvd E/SR 162 TIME: 11:25-12:20 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-046 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 2
27 2
28 2
29 1
30 7
31 6
32 7
33 10
34 13
35 13
36 5
37 11
38 7
39 4
40 3
41 4
42 1
43 44 1
45 46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 26 - 46 34 mph 38 mph 30 - 39 83 83% 7% / 7 10% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
304
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: S 5th Ave Bet Sewerage Commission Oroville Dwy & Georgia Pacific Way TIME: 10:10-11:15 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-047 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 1
32 33
34 2
35 3
36 3
37 3
38 2
39 2
40 7
41 1
42 4
43 4
44 3
45 4
46 4
47 2
48 1
49 50 2
51 52 1
53 1
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 31 - 53 42 mph 46 mph 37 - 46 34 68% 18% / 9 14% / 7 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
305
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: S 5th Ave Bet Sewerage Commission Oroville Dwy & Georgia Pacific Way TIME: 10:10-11:15 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-047 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 32
33 1
34 3
35 4
36 2
37 38 4
39 3
40 3
41 2
42 2
43 4
44 2
45 4
46 3
47 2
48 4
49 1
50 3
51 52 1
53 1
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 30 - 53 42 mph 48 mph 38 - 47 29 58% 22% / 11 20% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
306
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/29/2026 Location: S 5th Ave Bet Sewerage Commission Oroville Dwy & Georgia Pacific Way TIME: 10:10-11:15 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-047 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30 1
31 1
32 33 1
34 5
35 7
36 5
37 3
38 6
39 5
40 10
41 3
42 6
43 8
44 5
45 8
46 7
47 4
48 5
49 1
50 5
51 52 2
53 2
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 30 - 53 42 mph 47 mph 38 - 47 62 62% 23% / 23 15% / 15 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
307
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Table Mountain Blvd Bet Riverview Terrace Dr & Nelson Ave/Cherokee Rd TIME: 11:05-11:35 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-048 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28 2
29 30 1
31 1
32 2
33 3
34 4
35 7
36 5
37 4
38 3
39 6
40 5
41 2
42 1
43 2
44 45 1
46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 28 - 46 36 mph 40 mph 32 - 41 41 82% 8% / 4 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
308
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Table Mountain Blvd Bet Riverview Terrace Dr & Nelson Ave/Cherokee Rd TIME: 11:05-11:35 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-048 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 1
28 2
29 30 2
31 2
32 7
33 4
34 9
35 4
36 6
37 3
38 2
39 1
40 2
41 1
42 1
43 44 1
45 1
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 26 - 45 34 mph 38 mph 30 - 39 40 80% 8% / 4 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
309
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/4/2026 Location: Table Mountain Blvd Bet Riverview Terrace Dr & Nelson Ave/Cherokee Rd TIME: 11:05-11:35 Posted Speed: 35 MPH Weather: Clear/Dry Project #: 26-100003-048 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26 1
27 1
28 4
29 30 3
31 3
32 9
33 7
34 13
35 11
36 11
37 7
38 5
39 7
40 7
41 3
42 2
43 2
44 1
45 2
46 1
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 26 - 46 35 mph 40 mph 31 - 40 80 80% 9% / 9 11% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
310
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Table Mountain Blvd Bet Garden Dr & Nelson Ave/Cherokee Rd TIME: 13:20-15:20 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-049 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 2
34 1
35 3
36 4
37 5
38 7
39 5
40 4
41 5
42 4
43 3
44 2
45 3
46 1
47 48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 33 - 48 39 mph 43 mph 35 - 44 42 84% 6% / 3 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
311
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Table Mountain Blvd Bet Garden Dr & Nelson Ave/Cherokee Rd TIME: 13:20-15:20 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-049 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 1
34 2
35 3
36 2
37 5
38 8
39 7
40 7
41 3
42 4
43 2
44 1
45 2
46 1
47 1
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 32 - 47 39 mph 42 mph 34 - 43 43 86% 4% / 2 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
312
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 1/28/2026 Location: Table Mountain Blvd Bet Garden Dr & Nelson Ave/Cherokee Rd TIME: 13:20-15:20 Posted Speed: 45 MPH Weather: Clear/Dry Project #: 26-100003-049 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32 1
33 3
34 3
35 6
36 6
37 10
38 15
39 12
40 11
41 8
42 8
43 5
44 3
45 5
46 2
47 1
48 1
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 32 - 48 39 mph 43 mph 34 - 43 84 84% 4% / 4 12% / 12 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
313
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Washington Ave Bet Mitchell Ave & Montgomery St/CR B2 TIME: 09:50-10:20 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-050 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 3
26 3
27 4
28 5
29 3
30 6
31 4
32 8
33 6
34 2
35 3
36 1
37 38 1
39 40
41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 25 - 41 31 mph 34 mph 25 - 34 44 88% 0% / 0 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
314
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Washington Ave Bet Mitchell Ave & Montgomery St/CR B2 TIME: 09:50-10:20 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-050 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 2
26 3
27 3
28 2
29 4
30 5
31 7
32 3
33 6
34 2
35 4
36 3
37 2
38 1
39 1
40 1
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 24 - 40 31 mph 36 mph 26 - 35 39 78% 6% / 3 16% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
315
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Washington Ave Bet Mitchell Ave & Montgomery St/CR B2 TIME: 09:50-10:20 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-050 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 24 1
25 5
26 6
27 7
28 7
29 7
30 11
31 11
32 11
33 12
34 4
35 7
36 4
37 2
38 2
39 1
40 1
41 1
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 24 - 41 31 mph 35 mph 26 - 35 83 83% 6% / 6 11% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
316
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Washington Ave Bet Mitchell Ave & Oro Dam Blvd E/SR 162 TIME: 09:00-09:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-051 Northbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 2
24 1
25 3
26 3
27 4
28 10
29 9
30 5
31 2
32 3
33 3
34 35 2
36 37 1
38 39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 39 29 mph 32 mph 24 - 33 43 86% 6% / 3 8% / 4 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10 12
Speed - MPH
Number of Vehicles
317
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Washington Ave Bet Mitchell Ave & Oro Dam Blvd E/SR 162 TIME: 09:00-09:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-051 Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 2
24 3
25 8
26 6
27 8
28 9
29 4
30 5
31 1
32 2
33 34 1
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 34 27 mph 30 mph 23 - 32 48 96% 2% / 1 2% / 1 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
318
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Northbound & Southbound
DATE: 2/3/2026 Location: Washington Ave Bet Mitchell Ave & Oro Dam Blvd E/SR 162 TIME: 09:00-09:45 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-051 Northbound & Southbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 2
23 4
24 4
25 11
26 9
27 12
28 19
29 13
30 10
31 3
32 5
33 3
34 1
35 2
36 37 1
38 39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 22 - 39 28 mph 31 mph 23 - 32 90 90% 2% / 2 8% / 8 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15 20
Speed - MPH
Number of Vehicles
319
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/26/2026 Location: Wyandotte Ave Bet Richter Ave & Lower Wyandotte Rd TIME: 13:25-14:25 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-052 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18 1
19 20
21 22 1
23 2
24 2
25 5
26 4
27 3
28 5
29 4
30 5
31 2
32 4
33 3
34 3
35 2
36 1
37 1
38 39
40 1
41 42 1
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 18 - 42 29 mph 34 mph 25 - 34 38 76% 12% / 6 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6
Speed - MPH
Number of Vehicles
320
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/26/2026 Location: Wyandotte Ave Bet Richter Ave & Lower Wyandotte Rd TIME: 13:25-14:25 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-052 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22
23 1
24 2
25 2
26 5
27 6
28 8
29 3
30 3
31 4
32 4
33 4
34 3
35 1
36 1
37 38 2
39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 23 - 39 29 mph 34 mph 25 - 34 42 84% 6% / 3 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
321
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/26/2026 Location: Wyandotte Ave Bet Richter Ave & Lower Wyandotte Rd TIME: 13:25-14:25 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-052 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18 1
19 20
21 22 1
23 3
24 4
25 7
26 9
27 9
28 13
29 7
30 8
31 6
32 8
33 7
34 6
35 3
36 2
37 1
38 2
39 1
40 1
41 42 1
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 18 - 42 29 mph 34 mph 25 - 34 80 80% 9% / 9 11% / 11 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
322
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Yard St Bet Baldwin Ave & Washington Ave TIME: 13:45-15:15 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-053 Eastbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 1
22 3
23 1
24 2
25 8
26 5
27 3
28 4
29 3
30 5
31 3
32 3
33 4
34 1
35 2
36 37
38 1
39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 21 - 39 28 mph 33 mph 24 - 33 40 80% 10% / 5 10% / 5 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8 10
Speed - MPH
Number of Vehicles
323
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Yard St Bet Baldwin Ave & Washington Ave TIME: 13:45-15:15 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-053 Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 22 1
23 2
24 3
25 4
26 7
27 4
28 6
29 4
30 7
31 3
32 3
33 1
34 2
35 1
36 2
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 >=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 50 22 - 36 28 mph 32 mph 23 - 32 43 86% 2% / 1 12% / 6 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 2 4 6 8
Speed - MPH
Number of Vehicles
324
Item 10.

Spot Speed Study
Prepared by: National Data & Surveying Services
City of Oroville
Eastbound & Westbound
DATE: 1/28/2026 Location: Yard St Bet Baldwin Ave & Washington Ave TIME: 13:45-15:15 Posted Speed: 25 MPH Weather: Clear/Dry Project #: 26-100003-053 Eastbound & Westbound Spot Speeds
Speed
mph ALL Vehicles
<=10
11 12
13 14
15 16
17 18
19 20
21 1
22 4
23 3
24 5
25 12
26 12
27 7
28 10
29 7
30 12
31 6
32 6
33 5
34 3
35 3
36 2
37 38 1
39 1
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
>=70

SPEED PARAMETERS
Class Count Range
50th
Percentile
85th
Percentile
10 MPH
Pace # in Pace
Percent in
Pace % / # Below Pace % / # Above Pace
ALL 100 21 - 39 28 mph 32 mph 24 - 33 82 82% 8% / 8 10% / 10 70 68
66 64
62 60
58 56
54 52
50 48
46 44
42 40
38 36
34 32
30 28
26 24
22 20
18 16
14 12
10 0 5 10 15
Speed - MPH
Number of Vehicles
325
Item 10.

APPENDIX B

EXCERPTS FROM THE MUTCD AND CVC
326
Item 10.

Appendix B – Excerpts from the California MUTCD
CA MUTCD Section 2B.21 – Speed Limit Sign (R2-1)
Speed zones (other than statutory speed limits) shall only be established on the basis of an engineering study that has been performed in accordance with traffic engineering practices.

The engineering study shall include an analysis of the current speed distribution of freeflowing vehicles.

The Speed Limit (R2-1) sign shall display the speed limit established by law, ordinance, regulation, or as adopted by the authorized agency based on the engineering study. The speed limits displayed shall be in multiples of 5 mph.

Speed Limit Determination – Engineering Practice
The most widely accepted method of determining the posted speed limit is to set the speed limit at the 85th percentile speed, which is the speed at or below which 85 percent of the traffic is moving. This speed is used to determine the posted speed limit by rounding to the nearest 5-mile-per-hour increment.

Allowable Reduction from the 85th Percentile Speed
If there are sufficient conditions not readily apparent to the driver, as determined by a registered engineer, the posted speed limit may be reduced by 5 mph from the rounded 85th percentile speed. Such a reduction shall be clearly documented in the Engineering and Traffic Survey.

Relationship Between the MUTCD and the California Vehicle Code Setting a speed limit must comply with the California Vehicle Code and standards in the California Manual on Uniform Traffic Control Devices (CA MUTCD). Establishing speed limits requires a rational and defensible engineering determination.

Engineering and Traffic Surveys and Enforcement
Any speed limit that deviates from statutory speed limits shall be established based on an Engineering and Traffic Survey conducted by a licensed engineer in order to support radar speed enforcement.
327
Item 10.

Excerpts from the California Vehicle Code (CVC)
627.
(a) “Engineering and traffic survey,” as used in this code, means a survey of highway and traffic conditions in accordance with methods determined by the Department of Transportation for use by state and local authorities.
(b) An engineering and traffic survey shall include, among other requirements deemed necessary by the department, consideration of all of the following:
(1) Prevailing speeds as determined by traffic engineering measurements. (2) Accident records.
(3) Highway, traffic, and roadside conditions not readily apparent to the driver. (c) When conducting an engineering and traffic survey, local authorities, in addition to the factors set forth in paragraphs (1) to (3), inclusive, of subdivision (b) may consider all of the following:
(1) Residential density, if any of the following conditions exist on the particular portion of highway and the property contiguous thereto, other than a business district:
(A) Upon one side of the highway, within a distance of a quarter of a mile, the contiguous property fronting thereon is occupied by 13 or more separate dwelling houses or business structures.
(B) Upon both sides of the highway, collectively, within a distance of a quarter of a mile, the contiguous property fronting thereon is occupied by 16 or more separate dwelling houses or business structures.
(C) The portion of highway is longer than one-quarter of a mile but has the ratio of separate dwelling houses or business structures to the length of the highway described in either subparagraph (A) or (B).
(2) Safety of bicyclists and pedestrians, with increased consideration for vulnerable pedestrian groups including children, seniors, persons with disabilities, users of personal assistive mobility devices, and the unhoused.
(Amended by Stats. 2021, Ch. 690, Sec. 1. (AB 43) Effective January 1, 2022.) 328
Item 10.
22349.
(a) Except as provided in Section 22356, no person may drive a vehicle upon a highway at a speed greater than 65 miles per hour.
(b) Notwithstanding any other provision of law, no person may drive a vehicle upon a twolane, undivided highway at a speed greater than 55 miles per hour unless that highway, or portion thereof, has been posted for a higher speed by the Department of Transportation or appropriate local agency upon the basis of an engineering and traffic survey. For purposes of this subdivision, the following apply:
(1) A two-lane, undivided highway is a highway with not more than one through lane of travel in each direction.
(2) Passing lanes may not be considered when determining the number of through lanes. (c) It is the intent of the Legislature that there be reasonable signing on affected two-lane, undivided highways described in subdivision (b) in continuing the 55 miles-per-hour speed limit, including placing signs at county boundaries to the extent possible, and at other appropriate locations.
(Amended by Stats. 1999, Ch. 724, Sec. 41. Effective January 1, 2000.) 22352.

The prima facie limits are as follows and shall be applicable unless changed as authorized in this code and, if so changed, only when signs have been erected giving notice thereof:
(a) Fifteen miles per hour:
(1) When traversing a railway grade crossing, if during the last 100 feet of the approach to the crossing the driver does not have a clear and unobstructed view of the crossing and of any traffic on the railway for a distance of 400 feet in both directions along the railway. This subdivision does not apply in the case of any railway grade crossing where a human flagperson is on duty or a clearly visible electrical or mechanical railway crossing signal device is installed but does not then indicate the immediate approach of a railway train or car.
(2) When traversing any intersection of highways if during the last 100 feet of the driver’s approach to the intersection the driver does not have a clear and unobstructed view of the intersection and of any traffic upon all of the highways entering the intersection for a 329
Item 10.
distance of 100 feet along all those highways, except at an intersection protected by stop signs or yield right-of-way signs or controlled by official traffic control signals. (3) On any alley.
(b) Twenty-five miles per hour:
(1) On any highway, in any business or residence district unless a different speed is determined by local authority or the Department of Transportation under procedures set forth in this code.
(2) When approaching or passing a school building or the grounds thereof, contiguous to a highway and posted with a standard “SCHOOL” warning sign, while children are going to or leaving the school either during school hours or during the noon recess period. The prima facie limit shall also apply when approaching or passing any school grounds which are not separated from the highway by a fence, gate, or other physical barrier while the grounds are in use by children and the highway is posted with a standard “SCHOOL” warning sign. For purposes of this subparagraph, standard “SCHOOL” warning signs may be placed at any distance up to 500 feet away from school grounds.
(3) When passing a senior center or other facility primarily used by senior citizens, contiguous to a street other than a state highway and posted with a standard “SENIOR” warning sign. A local authority may erect a sign pursuant to this paragraph when the local agency makes a determination that the proposed signing should be implemented. A local authority may request grant funding from the Active Transportation Program pursuant to Chapter 8 (commencing with Section 2380) of Division 3 of the Streets and Highways Code, or any other grant funding available to it, and use that grant funding to pay for the erection of those signs, or may utilize any other funds available to it to pay for the erection of those signs, including, but not limited to, donations from private sources. (Amended by Stats. 2021, Ch. 690, Sec. 3. (AB 43) Effective January 1, 2022.) 22354.
(a) Whenever the Department of Transportation determines upon the basis of an engineering and traffic survey that the limit of 65 miles per hour is more than is reasonable or safe upon any portion of a state highway where the limit of 65 miles is applicable, the department may determine and declare a prima facie speed limit of 60, 55, 50, 45, 40, 35, 30, 25, 20, or 15 miles per hour, whichever is found most appropriate to facilitate the orderly movement of traffic and is reasonable and safe, which declared prima facie speed limit shall be effective when appropriate signs giving notice thereof are erected upon the highway.
330
Item 10.
(b) This section shall become operative on the date specified in subdivision (c) of Section 22366.
(Amended by Stats. 2021, Ch. 690, Sec. 4. (AB 43) Effective January 1, 2022.) Vehicle Code - VEH
DIVISION 17. OFFENSES AND PROSECUTION [40000.1 - 41610] ( Division 17 enacted by Stats. 1959, Ch. 3. )
22357.
(a) Whenever a local authority determines upon the basis of an engineering and traffic survey that a speed greater than 25 miles per hour would facilitate the orderly movement of vehicular traffic and would be reasonable and safe upon any street other than a state highway otherwise subject to a prima facie limit of 25 miles per hour, the local authority may by ordinance determine and declare a prima facie speed limit of 30, 35, 40, 45, 50, 55, or 60 miles per hour or a maximum speed limit of 65 miles per hour, whichever is found most appropriate to facilitate the orderly movement of traffic and is reasonable and safe.

The declared prima facie or maximum speed limit shall be effective when appropriate signs giving notice thereof are erected upon the street and shall not thereafter be revised except upon the basis of an engineering and traffic survey. This section does not apply to any 25- mile-per-hour prima facie limit which is applicable when passing a school building or the grounds thereof or when passing a senior center or other facility primarily used by senior citizens.
(b) This section shall become operative on the date specified in subdivision (c) of Section 22366.
(Repealed (in Sec. 28) and added by Stats. 1995, Ch. 766, Sec. 29. Effective January 1, 1996. This section became operative, by its own provisions, on the date described in Section 22366.)
22358.
(a) Whenever a local authority determines upon the basis of an engineering and traffic survey that the limit of 65 miles per hour is more than is reasonable or safe upon any portion of any street other than a state highway where the limit of 65 miles per hour is applicable, the local authority may by ordinance determine and declare a prima facie speed limit of 60, 55, 50, 45, 40, 35, 30, 25, 20, or 15 miles per hour, whichever is found most appropriate to facilitate the orderly movement of traffic and is reasonable and safe, 331
Item 10.
which declared prima facie limit shall be effective when appropriate signs giving notice thereof are erected upon the street.
(b) This section shall become operative on the date specified in subdivision (c) of Section 22366.
(Amended by Stats. 2021, Ch. 690, Sec. 5. (AB 43) Effective January 1, 2022.) 22358.3.

Whenever a local authority determines upon the basis of an engineering and traffic survey that the prima facie speed limit of 25 miles per hour in a business or residence district or in a public park on any street having a roadway not exceeding 25 feet in width, other than a state highway, is more than is reasonable or safe, the local authority may, by ordinance or resolution, determine and declare a prima facie speed limit of 20 or 15 miles per hour, whichever is found most appropriate and is reasonable and safe. The declared prima facie limit shall be effective when appropriate signs giving notice thereof are erected upon the street.
(Amended by Stats. 1972, Ch. 1095.)
22358.4.
(a) (1) Whenever a local authority determines upon the basis of an engineering and traffic survey that the prima facie speed limit of 25 miles per hour established by subdivision (b) of Section 22352 is more than is reasonable or safe, the local authority may, by ordinance or resolution, determine and declare a prima facie speed limit of 20 or 15 miles per hour, whichever is justified as the appropriate speed limit by that survey. (2) An ordinance or resolution adopted under paragraph (1) shall not be effective until appropriate signs giving notice of the speed limit are erected upon the highway and, in the case of a state highway, until the ordinance is approved by the Department of Transportation and the appropriate signs are erected upon the highway. (b) (1) Notwithstanding subdivision (a) or any other provision of law, a local authority may, by ordinance or resolution, determine and declare prima facie speed limits as follows:
(A) A 15 miles per hour prima facie limit in a residence district, on a highway with a posted speed limit of 30 miles per hour or slower, when approaching, at a distance of less than 500 feet from, or passing, a school building or the grounds of a school building, contiguous to a highway and posted with a school warning sign that indicates a speed limit of 15 miles per hour, while children are going to or leaving the school, either during school hours or during the noon recess period. The prima facie limit shall also apply when approaching, at a 332
Item 10.
distance of less than 500 feet from, or passing, school grounds that are not separated from the highway by a fence, gate, or other physical barrier while the grounds are in use by children and the highway is posted with a school warning sign that indicates a speed limit of 15 miles per hour.
(B) A 25 miles per hour prima facie limit in a residence district, on a highway with a posted speed limit of 30 miles per hour or slower, when approaching, at a distance of 500 to 1,000 feet from, a school building or the grounds thereof, contiguous to a highway and posted with a school warning sign that indicates a speed limit of 25 miles per hour, while children are going to or leaving the school, either during school hours or during the noon recess period. The prima facie limit shall also apply when approaching, at a distance of 500 to 1,000 feet from, school grounds that are not separated from the highway by a fence, gate, or other physical barrier while the grounds are in use by children and the highway is posted with a school warning sign that indicates a speed limit of 25 miles per hour. (2) The prima facie limits established under paragraph (1) apply only to highways that meet all of the following conditions:
(A) A maximum of two traffic lanes.
(B) A maximum posted 30 miles per hour prima facie speed limit immediately prior to and after the school zone.
(3) The prima facie limits established under paragraph (1) apply to all lanes of an affected highway, in both directions of travel.
(4) When determining the need to lower the prima facie speed limit, the local authority shall take the provisions of Section 627 into consideration. (5) (A) An ordinance or resolution adopted under paragraph (1) shall not be effective until appropriate signs giving notice of the speed limit are erected upon the highway and, in the case of a state highway, until the ordinance is approved by the Department of Transportation and the appropriate signs are erected upon the highway. (B) For purposes of subparagraph (A) of paragraph (1), school warning signs indicating a speed limit of 15 miles per hour may be placed at a distance up to 500 feet away from school grounds.
(C) For purposes of subparagraph (B) of paragraph (1), school warning signs indicating a speed limit of 25 miles per hour may be placed at any distance between 500 and 1,000 feet away from the school grounds.
333
Item 10.
(D) A local authority shall reimburse the Department of Transportation for all costs incurred by the department under this subdivision.
(Amended by Stats. 2016, Ch. 208, Sec. 15. (AB 2906) Effective January 1, 2017.) 22358.5.

It is the intent of the Legislature that physical conditions such as width, curvature, grade and surface conditions, or any other condition readily apparent to a driver, in the absence of other factors, would not require special downward speed zoning, as the basic rule of section 22350 is sufficient regulation as to such conditions. (Added by Stats. 1959, Ch. 11.)
22358.6.
(a) The Department of Transportation shall, in the next scheduled revision, revise and thereafter maintain the California Manual on Uniform Traffic Control Devices to require the Department of Transportation or a local authority to round speed limits to the nearest five miles per hour of the 85th percentile of the free-flowing traffic. (b) In cases in which the speed limit needs to be rounded down to the nearest five miles per hour increment of the 85th-percentile speed, the Department of Transportation or a local authority may lower the speed limit by five miles per hour from the nearest five mile per hour increment of the 85th-percentile speed, in compliance with Sections 627 and 22358.5 and the California Manual on Uniform Traffic Control Devices, as it read on March 30, 2021, if the reasons for the lower speed limit are documented in an engineering and traffic survey.

The Department of Transportation or a local authority may also take into consideration Sections 22353, 22353.2, 22353.3, 22353.4, and 22353.5, if applicable. (c) In cases in which the speed limit needs to be rounded up to the nearest five miles per hour increment of the 85th-percentile speed, the Department of Transportation or a local authority may decide to instead round down the speed limit to the lower five miles per hour increment. If the speed limit is rounded down pursuant to this subdivision, the speed limit shall not be reduced any further pursuant to subdivision (b). (d) In addition to subdivisions (b) and (c), a local authority may additionally lower the speed limit as provided in Section 22358.7.
(e) The total reduction in the speed limit pursuant to subdivisions (a) to (d), inclusive, shall not exceed 12.4 miles per hour from the 85th percentile speed. (f) Notwithstanding subdivisions (a) to (e), inclusive, a local authority may retain the currently adopted speed limit as provided in Section 22358.8 without further reduction, or 334
Item 10.
restore the immediately prior adopted speed limit as provided in Section 22358.8 without further reduction.
(Amended by Stats. 2022, Ch. 406, Sec. 2. (AB 1938) Effective January 1, 2023.) 22358.7.
(a) If a local authority, after completing an engineering and traffic survey, finds that the speed limit is still more than is reasonable or safe, the local authority may, by ordinance, determine and declare a prima facie speed limit that has been reduced an additional five miles per hour for either of the following reasons:
(1) The portion of highway has been designated as a safety corridor. A local authority shall not deem more than one-fifth of their streets as safety corridors. (2) The portion of highway is adjacent to any land or facility that generates high concentrations of bicyclists or pedestrians, especially those from vulnerable groups such as children, seniors, persons with disabilities, and the unhoused. (b) (1) As used in this section, “safety corridor” shall be defined by the Department of Transportation in the next revision of the California Manual on Uniform Traffic Control Devices. In making this determination, the department shall consider highways that have the highest number of serious injuries and fatalities based on collision data that may be derived from, but not limited to, the Statewide Integrated Traffic Records System. (2) The Department of Transportation shall, in the next revision of the California Manual on Uniform Traffic Control Devices, determine what constitutes land or facilities that generate high concentrations of bicyclists and pedestrians, as used in paragraph (2) of subdivision (a). In making this determination, the department shall consider density, road use type, and bicycle and pedestrian infrastructure present on a section of highway. (c) A local authority may not lower a speed limit as authorized by this section until June 30, 2024, or until the Judicial Council has developed an online tool for adjudicating infraction violations statewide as specified in Article 7 (commencing with Section 68645) of Chapter 2 of Title 8 of the Government Code, whichever is sooner. (d) A local authority shall issue only warning citations for violations of exceeding the speed limit by 10 miles per hour or less for the first 30 days that a lower speed limit is in effect as authorized by this section.
(Added by Stats. 2021, Ch. 690, Sec. 7. (AB 43) Effective January 1, 2022.) 22358.8.
335
Item 10.
(a) If a local authority, after completing an engineering and traffic survey, finds that the speed limit is still more than is reasonable or safe, the local authority may, by ordinance, retain the currently adopted speed limit or restore the immediately prior adopted speed limit if that speed limit was established with an engineering and traffic survey and if a registered engineer has evaluated the section of highway and determined that no additional general purpose lanes have been added to the roadway since completion of the traffic survey that established that speed limit.
(b) This section does not authorize a speed limit to be reduced by any more than five miles per hour from the currently adopted speed limit nor below the immediately prior speed limit.
(c) A local authority shall issue only warning citations for violations of exceeding the speed limit by 10 miles per hour or less for the first 30 days that a lower speed limit is in effect as authorized by this section.
(Amended by Stats. 2022, Ch. 406, Sec. 3. (AB 1938) Effective January 1, 2023.) 336
Item 10.

CHAPTER 3. Illegal Evidence [40800 - 40834]
( Chapter 3 enacted by Stats. 1959, Ch. 3. )

ARTICLE 1. Prosecutions Under Code [40800 - 40808]
( Article 1 enacted by Stats. 1959, Ch. 3. )

40802.
(a) A “speed trap” is either of the following:
(1) A particular section of a highway measured as to distance and with boundaries marked, designated, or otherwise determined in order that the speed of a vehicle may be calculated by securing the time it takes the vehicle to travel the known distance. (2) A particular section of a highway with a prima facie speed limit that is provided by this code or by local ordinance under paragraph (1) of subdivision (b) of Section 22352, or established under Section 22354, 22357, 22358, or 22358.3, if that prima facie speed limit is not justified by an engineering and traffic survey conducted within five years prior to the date of the alleged violation, and enforcement of the speed limit involves the use of radar or any other electronic device that measures the speed of moving objects. This paragraph does not apply to a local street, road, school zone, senior zone, business activity district, or speed limit adopted under Section 22358.7 or 22358.8.
(b) (1) For purposes of this section, a local street or road is one that is functionally classified as “local” on the “California Road System Maps,” that are approved by the Federal Highway Administration and maintained by the Department of Transportation. It may also be defined as a “local street or road” if it primarily provides access to abutting residential property and meets the following three conditions:
(A) Roadway width of not more than 40 feet.
(B) Not more than one-half of a mile of uninterrupted length. Interruptions shall include official traffic control signals as defined in Section 445. (C) Not more than one traffic lane in each direction.
337
Item 10.
(2) For purposes of this section, “school zone” means that area approaching or passing a school building or the grounds thereof that is contiguous to a highway and on which is posted a standard “SCHOOL” warning sign, while children are going to or leaving the school either during school hours or during the noon recess period. “School zone” also includes the area approaching or passing any school grounds that are not separated from the highway by a fence, gate, or other physical barrier while the grounds are in use by children if that highway is posted with a standard “SCHOOL” warning sign. (3) For purposes of this section, “senior zone” means that area approaching or passing a senior center building or other facility primarily used by senior citizens, or the grounds thereof that is contiguous to a highway and on which is posted a standard “SENIOR” warning sign, pursuant to Section 22352.
(4) For purposes of this section, “business activity district” means a section of highway described in subdivision (b) of Section 22358.9 in which a standard 25 miles per hour or 20 miles per hour speed limit sign has been posted pursuant to paragraph (1) of subdivision (a) of that section.
(c) (1) When all of the following criteria are met, paragraph (2) of this subdivision shall be applicable and subdivision (a) shall not be applicable:
(A) When radar is used, the arresting officer has successfully completed a radar operator course of not less than 24 hours on the use of police traffic radar, and the course was approved and certified by the Commission on Peace Officer Standards and Training. (B) When laser or any other electronic device is used to measure the speed of moving objects, the arresting officer has successfully completed the training required in subparagraph (A) and an additional training course of not less than two hours approved and certified by the Commission on Peace Officer Standards and Training. (C) (i) The prosecution proved that the arresting officer complied with subparagraphs (A) and (B) and that an engineering and traffic survey has been conducted in accordance with subparagraph (B) of paragraph (2). The prosecution proved that, prior to the officer issuing the notice to appear, the arresting officer established that the radar, laser, or other electronic device conformed to the requirements of subparagraph (D). (ii) The prosecution proved the speed of the accused was unsafe for the conditions present at the time of alleged violation unless the citation was for a violation of Section 22349, 22356, or 22406.
(D) The radar, laser, or other electronic device used to measure the speed of the accused meets or exceeds the minimal operational standards of the National Highway Traffic Safety 338
Item 10.

Administration, and has been calibrated within the three years prior to the date of the alleged violation by an independent certified laser or radar repair and testing or calibration facility.
(2) A “speed trap” is either of the following:
(A) A particular section of a highway measured as to distance and with boundaries marked, designated, or otherwise determined in order that the speed of a vehicle may be calculated by securing the time it takes the vehicle to travel the known distance. (B) (i) A particular section of a highway or state highway with a prima facie speed limit that is provided by this code or by local ordinance under paragraph (1) of subdivision (b) of Section 22352, or established under Section 22354, 22357, 22358, or 22358.3, if that prima facie speed limit is not justified by an engineering and traffic survey conducted within one of the following time periods, prior to the date of the alleged violation, and enforcement of the speed limit involves the use of radar or any other electronic device that measures the speed of moving objects:
(I) Except as specified in subclause (II), seven years. (II) If an engineering and traffic survey was conducted more than seven years prior to the date of the alleged violation, and a registered engineer evaluates the section of the highway and determines that no significant changes in roadway or traffic conditions have occurred, including, but not limited to, changes in adjoining property or land use, roadway width, or traffic volume, 14 years.
(ii) This subparagraph does not apply to a local street, road, or school zone, senior zone, business activity district, or speed limit adopted under Section 22358.7 or 22358.8. (Amended by Stats. 2022, Ch. 406, Sec. 5. (AB 1938) Effective January 1, 2023.) 339
Item 10.

Page 1 ends
← All documents from this meeting