MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
periodically to see if the birds
are stressed by the
construction activities and if
the protective buffer needs to
be increased. The perimeter of
the nest setback zone shall be
fenced or adequately
demarcated with stakes and
flagging at 20-foot intervals,
and construction personnel
and activities restricted from
the area. A survey report by the
qualified biologist verifying that
no active nests are present, or
that the young have fledged,
shall be submitted prior to
initiation of grading in the nestsetback zone. The qualified biologist shall serve as a
biological monitor during those
periods when construction
activities occur near active
nest areas to ensure that no
inadvertent impacts on these
nests occur. All buffers shall be
shown on all sets of
construction drawings. If
construction activities are
determined to potentially
cause nest abandonment,
work shall cease until the
project biologist determines
that the nest is unoccupied. For
raptors, the CDFW and/or the
1.f
Packet Pg. 1099 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
USFWS Division of Migratory
Bird Management shall be
contacted for guidance.
4.1-3 Have a substantial
adverse effect, either
directly (e.g., cause a
wildlife population to
drop below selfsustaining levels,
threaten to eliminate an
animal community) or
through habitat
modifications, on any
wildlife species identified
as a candidate, sensitive,
or special-status species.
4.1-3(a) Implement Mitigation Measures 4.1-
4(b) and 4.1-4(c).
4.1-3(b) Pre-construction surveys for specialstatus and non-listed bat species shall be performed by a qualified biologist
prior to removal of the on-site trees and
commencement of construction
activities. If any active maternity or
hibernation roosts are identified within
100 feet of areas proposed for
development, a CDFW-approved
qualified biologist shall establish sitespecific protective buffers around roosts, sized with consideration for the
species that are present and the time of
year bats are roosting, as well as levels
of construction noise and light emission
from project activities.
See Mitigation
Measures 4.1-
4(b) and 4.1-
4(c)
City of Pacifica
Planning
Division
CDFW
See Mitigation
Measures 4.1-4(b)
and 4.1-4(c)
Prior to removal of
the on-site trees
and commencement
of construction
activities
4.1-4 Have a substantial
adverse effect on any
riparian habitat or other
sensitive natural
community, or State or
federally protected
wetlands (including, but
not limited to, marsh,
vernal pool, coastal, etc.)
through direct removal,
4.1-4(a) Prior to the commencement of grounddisturbing activities, the project applicant shall notify CDFW, pursuant
to CFGC Section 1600. The notification
shall include a description of all of the
activities associated with the proposed
project, not just those associated with
the drainages and/or riparian
vegetation. Impacts shall be outlined in
the notification and are expected to be
City of Pacifica
Planning
Division
CDFW
Prior to the
commencement of
ground-disturbing
activities
1.f
Packet Pg. 1100 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
filling, hydrological
interruption, or other
means.
in substantial conformance with the
impacts to biological resources outlined
in the Updated Definition of Potentially
Jurisdictional Aquatic Resources and
Effects Analysis prepared for the 570
Crespi Drive Project by Wood
Biological Consulting. Impacts for each
activity shall be broken down by
temporary and permanent impacts. A
description of the proposed mitigation
for biological resource impacts shall be
outlined per activity and then by
temporary and permanent impact.
Information regarding project-specific
drainage and hydrology changes
resulting from project implementation
shall be provided, along with a
description of stormwater treatment
methods. Minimization and avoidance
measures shall be proposed, as
appropriate, and may include
preconstruction species surveys and
reporting, protective fencing around
avoided biological resources, worker
environmental awareness training,
seeding disturbed areas adjacent to
open space areas with native seed, and
installation of project-specific
stormwater BMPs. Mitigation for
impacts to 0.550-acre of arroyo willow
scrub riparian vegetation may include
restoration or enhancement of
resources on- or off-site, or any other
method acceptable to CDFW.
1.f
Packet Pg. 1101 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
Mitigation shall not result in a net loss
of a Sensitive Natural Community.
If CDFW determines through the
course of the CFGC Section 1600
notification process that the project
does not require a Lake or Streambed
Alteration Agreement (LSAA) to
address potential impacts to arroyo
willow scrub, further mitigation beyond
the proposed mitigation included in the
notice to CDFW regarding the
aforementioned vegetation
communities shall not be required.
Written verification of the applicant’s
compliance with the Section 1600
LSAA process shall be submitted to the
City of Pacifica Planning Division prior
to the start of any construction
activities.
4.1-4(b) Prior to the start of any construction
activities, a temporary sediment and
debris barrier shall be installed on the
southern limit of the construction area
that slopes toward the arroyo willow
and emergent wetland habitat. The
fence will also double as a wildlife
exclusion fence during construction.
The fence shall consist of standard
construction silt fence material with a
height of 36 inches. The lower six
inches of fence material shall either be
folded toward the construction side of
City of Pacifica
Planning
Division
Prior to the start of
any construction
activities
1.f
Packet Pg. 1102 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
the fence and weighted down with soil
or sandbags, or backfilled in a trench;
with both methods, the purpose is to
completely contact the surface so that
water and sediment would not flow
underneath, and wildlife would not
enter the work area from the wetland.
The barrier shall be maintained
throughout the duration of the
construction period. Evidence of
compliance with this measure shall be
submitted to the City of Pacifica
Planning Division prior to the start of
any construction activities.
4.1-4(c) A qualified biologist, or a designated
representative who has been trained by
a qualified biologist, shall inspect the
area inside of the sediment and debris
barrier for special-status species,
including California red-legged frog,
every day before construction activities
commence. If any special‐status
species are found, the qualified
biologist shall be immediately
contacted (if the survey was conducted
by the designated representative),
construction activities shall not be
allowed to start, and the USFWS and
CDFW shall be consulted on an
appropriate course of action. Such
action could include leaving the animal
alone to move away on its own or the
relocation of the animal to an area
City of Pacifica
Planning
Division
Every day before
construction
activities commence
1.f
Packet Pg. 1103 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
outside of the construction area. The
qualified biologist, in consultation with
the CDFW and USFWS, shall make the
ultimate determination of the action to
be taken. Evidence of compliance with
this measure shall be submitted to the
City’s Planning Department upon
discovery of special-status species and
prior to commencement of construction
activities.
4.1-6 Conflict with any local
policies or ordinances
protecting biological
resources, such as a tree
preservation policy or
ordinance.
4.1-6 Prior to issuance of any grading permit,
the project applicant shall obtain a Tree
Removal Permit for any protected trees
to be removed and a Tree
Encroachment Permit for any
construction activities within 50 feet of
a protected tree from the City of
Pacifica Director of Public Works.
Prior to issuance of a certificate of
occupancy, the project applicant shall
complete planting of any replacement
trees required as part of the Director of
Public Works heritage tree removal
authorization or other authorizations. In
addition, the project applicant shall
prepare and submit a Tree Protection
and Preservation Plan prior to the
protected tree removal or
encroachment authorizations or other
authorizations in accordance with the
City Municipal Code, Sections 4-12.02
through 4-12.11, and shall implement
any tree protection measures identified
City of Pacifica
Director of
Public Works
Prior to the
issuance of any
grading permit
1.f
Packet Pg. 1104 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
to protect trees which will not be
removed during construction prior to
commencement of any construction
activity.
Chapter 4.2 – Greenhouse Gas Emissions
4.2-1 Generate GHG
emissions, either directly
or indirectly, that may
have a significant impact
on the environment, or
conflict with an
applicable plan, policy, or
regulation adopted for
the purpose of reducing
the emissions of GHGs.
4.2-1(a) Prior to the approval of project
improvement plans, the applicant shall
implement the following measure:
• Consistent with BAAQMD’s
Transportation criterion d., a
total of four EV Capable
parking spaces shall be
installed throughout the 15 onsite uncovered parking spaces, and an additional four EV
Capable parking spaces shall
be installed throughout the 17
community center spaces,
consistent with the current
CALGreen Tier 2 standards.
Compliance with the foregoing
measure shall be ensured by the City of
Pacifica Planning Division.
4.2-1(b) Implement Mitigation Measure 4.3-3.
City of Pacifica
Planning
Division
See Mitigation
Measure 4.3-3
Prior to the approval
of project
improvement plans
See Mitigation
Measure 4.3-3
Chapter 4.3 – Transportation
4.3-1 Conflict with a program,
plan, ordinance, or policy
addressing the
4.3-1 Prior to grading permit issuance, the
project applicant shall prepare a
construction traffic management plan
City Engineer Prior to grading
permit issuance
1.f
Packet Pg. 1105 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
circulation system during
construction activities.
for review and approval by the City
Engineer. The plan shall include the
following:
• A project staging plan to
maximize on-site storage of
materials and equipment;
• A set of comprehensive traffic
control measures, including
scheduling of major truck trips
and deliveries to avoid peak
hours; lane closure
proceedings; signs, cones and
other warning devices for
drivers; and designation of
construction access routes;
• Provisions for maintaining
adequate emergency access to
the project site;
• Permitted construction hours,
per City of Pacifica standards;
• Designated locations for
construction staging areas;
• Identification of parking areas
for construction employees,
site visitors, and inspectors,
including on-site locations; and
• Provisions for street sweeping
to remove construction-related
debris on public streets.
4.3-3 Conflict or be
inconsistent with CEQA
4.3-3 The project applicant shall implement
the following CAPCOA VMT reduction
strategy T-9 to reduce the number of
City Engineer Prior to issuance of
final occupancy of
the residential units
1.f
Packet Pg. 1106 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
Guidelines section
15064.3, subdivision (b).
vehicle trips that would be generated by
future residents, subject to review and
approval by the City Engineer. The
timing for the strategy is set forth below:
Implement subsidized or discounted
transit program (CAPCOA Handbook
Strategy T-9)
The proposed project shall provide
subsidized or discounted, or free transit
passes for residents of the project’s 19
dwelling units.
Prior to occupancy of the multi-family
residential units, the project applicant
shall provide two free one-year transit
passes to residents of the project’s 19
dwelling units.
4.3-4 Substantially increase
hazards due to a
geometric design feature
(e.g., sharp curves or
dangerous intersections)
or incompatible uses
(e.g., farm equipment) or
result in inadequate
emergency access.
4.3-4 Implement Initial Study Mitigation
Measure IX-3.
See Mitigation
Measure IX-3
See Mitigation
Measure IX-3
Initial Study
a-c. Cause a substantial
adverse change in the
significance of a
historical resource
pursuant to Section
V-1. If any potentially historic resources,
prehistoric or historic artifacts, or other
indications of cultural deposits, such as
historic privy pits or trash deposits, are
found once ground disturbing activities
City of Pacifica
Planning
Division
Prior to the
continuation of
ground disturbing
activities, if any
potentially historic
1.f
Packet Pg. 1107 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
15064.5; cause a
substantial adverse
change in the
significance of a unique
archaeological resource
pursuant to Section
15064.5; or disturb any
human remains,
including those interred
outside of dedicated
cemeteries?
are underway, all work within the
vicinity of the find(s) shall cease, the
find(s) shall be immediately evaluated
by a qualified archaeologist, and the
City’s Planning Department shall be
notified of the find(s). If the find is
determined to be a historical or unique
archaeological resource, as
determined by the qualified
archeologist, contingency funding and
a time allotment to allow for
implementation of avoidance measures
or appropriate mitigation shall be made
available (CEQA Guidelines Section
15064.5). Work may continue on other
parts of the project site while historical
or unique archaeological resource
mitigation takes place (Public
Resources Code Sections 21083 and
21087).
The requirements of this mitigation
measure shall be included via notation
on all project improvement plans and
building permit plans for review and
approval by the City of Pacifica
Planning Department.
V-2. In the event of the accidental discovery
or recognition of any human remains,
further excavation or disturbance of the
find or any nearby area reasonably
suspected to overlie adjacent human
remains shall not occur until
City of Pacifica
Planning
Division
County
Coroner
resources,
prehistoric or
historic artifacts, or
other indications of
cultural deposits are
found once ground
disturbing activities
are underway
In the event of
accidental discovery
or recognition of
human remains
1.f
Packet Pg. 1108 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
compliance with the provisions of
CEQA Guidelines Section
15064.5(e)(1) and (2) has occurred.
The Guidelines specify that in the event
of the discovery of human remains
other than in a dedicated cemetery, no
further excavation at the site or any
nearby area suspected to contain
human remains shall occur until the
County Coroner has been notified to
determine if an investigation into the
cause of death is required. If the
Coroner determines that the remains
are Native American, then, within 24
hours, the Coroner must notify the
Native American Heritage Commission,
which in turn will notify the most likely
descendants who may recommend
treatment of the remains and any grave
goods. If the Native American Heritage
Commission is unable to identify a most
likely descendant or most likely
descendant fails to make a
recommendation within 48 hours after
notification by the Native American
Heritage Commission, or the
landowner or his authorized agent
rejects the recommendation by the
most likely descendant and mediation
by the Native American Heritage
Commission fails to provide a measure
acceptable to the landowner, then the
landowner or his authorized
representative shall rebury the human
NAHC
1.f
Packet Pg. 1109 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
remains and grave goods with
appropriate dignity at a location on the
property not subject to further
disturbances. If human remains are
encountered, a copy of the resulting
County Coroner report noting any
written consultation with the Native
American Heritage Commission shall
be submitted as proof of compliance to
the City of Pacifica Planning
Department.
The requirements of this mitigation
measure shall be included via notation
on all project improvement plans and
building permit plans for review and
approval by the City of Pacifica Planning
Department.
a,c. Directly or indirectly
cause potential
substantial adverse
effects, including the risk
of loss, injury, or death
involving: seismic-related
ground failure, including
liquefaction, or
landslides; or be located
on a geologic unit or soil
that is unstable, or that
would become unstable
as a result of the project,
and potentially result in
on- or off-site landslide,
lateral spreading,
VII-1. All grading and foundation plans for the
development shall be designed by a
Civil and Structural Engineer and
reviewed and approved by the Director
of Public Works/City Engineer, Chief
Building Official, and a qualified
Geotechnical Engineer prior to
issuance of a grading or building permit
to ensure that all geotechnical
recommendations specified in the
Geotechnical Investigation, dated
January 2016, and the Response to
Geotechnical Peer Review, dated April
30, 2020, prepared for the proposed
project by GeoForensics, Inc. are
Director of
Public
Works/City
Engineer
Chief Building
Official
Qualified
Geotechnical
Engineer
Prior to the
issuance of a
grading or building
permit
1.f
Packet Pg. 1110 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
subsidence, liquefaction
or collapse?
properly incorporated and utilized in the
project design.
d. Be located on expansive
soil, as defined in Table
18-1B of the Uniform
Building Code (1994),
creating substantial
direct or indirect risks to
life or property?
VII-2. Implement Mitigation Measure VII-1 See Mitigation Measure VII-1
See Mitigation
Measure VII-1
f. Directly or indirectly
destroy a unique
paleontological resource
or site or unique geologic
feature?
VII-3. In the event that paleontological
resources, including individual fossils
or assemblages of fossils, are
encountered during construction
activities all ground disturbing activities
shall immediately halt and a qualified
paleontologist shall be procured to
evaluate the discovery for the purpose
of recording, protecting, or curating the
discovery as appropriate. The qualified
paleontologist shall provide the City of
Pacifica Planning Department with a
report detailing the findings and method
of curation or protection of the
resources for review and approval by
City Planning staff prior to
recommencing construction
City of Pacifica
Planning
Division
In the event that
paleontological
resources, including
individual fossils or
assemblages of
fossils, are
encountered during
construction
activities
b. Create a significant
hazard to the public or
the environment through
reasonably foreseeable
upset and accident
conditions involving the
likely release of
IX-1. Prior to initiation of grading, excavation,
or other ground-disturbing activities on
the northern portion of the project site,
the project applicant shall complete an
analysis of on-site soils to determine
whether substantial concentrations of
soil contaminants are present above
the applicable direct exposure
City of Pacifica
Planning
Division
Prior to initiation of
grading, excavation,
or other grounddisturbing activities
on the northern
portion of the
project site
1.f
Packet Pg. 1111 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
hazardous materials into
the environment?
Environmental Screening Levels
(ESLs) set by the Regional Water
Quality Control Board. If contaminants
are not detected above applicable
ESLs, then further mitigation is not
required. If contaminants are detected
above the applicable ESLs, then the
soils shall be remediated by off-hauling
to a licensed landfill facility. Such
remediation activities shall be
performed by a licensed hazardous
waste contractor (Class A) and
contractor personnel that have
completed 40-hour OSHA Hazardous
Waste Operations and Emergency
Response (HAZWOPER) training, and
overseen by the San Mateo County
Environmental Health Services
Division. The results of soil sampling
and analysis, as well as verification of
proper remediation and disposal, shall
be submitted to the City of Pacifica
Planning Department for review and
approval.
c. Emit hazardous
emissions or handle
hazardous or acutely
hazardous materials,
substances, or waste
within one-quarter mile of
an existing or proposed
school?
IX-2. Implement Mitigation Measure IX-1. See Mitigation Measure IX-1
See Mitigation
Measure IX-1
1.f
Packet Pg. 1112 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
f. Impair implementation of
or physically interfere
with an adopted
emergency response
plan or emergency
evacuation plan?
IX-3. Prior to the issuance of a building
permit, the project shall demonstrate
compliance with the 26-foot access
road width, or obtain Fire Marshall
approval of an Alternative Methods and
Materials request by the NCFA to
deviate from the 26-foot access road
width requirement for the Project.
NCFA Prior to the
issuance of a
building permit
a,e. Violate any water quality
standards or waste
discharge requirements
or otherwise substantially
degrade surface or
ground water quality; or
conflict with or obstruct
implementation of a
water quality control plan
or sustainable
groundwater
management plan?
X-1. During construction, the contractor
shall implement BMPs to reduce
pollutants in stormwater discharges to
the maximum extent practicable, which
may include but are not necessarily
limited to the following practices, or
other BMPs identified in the California
Stormwater Quality Association
(CASQA) Construction BMP Handbook
and in the City’s Municipal Regional
Permit for stormwater discharges:
• Temporary erosion control
measures (such as silt fences,
staked straw bales/wattles,
silt/sediment basins and traps,
check dams, geofabric,
sandbag dikes, and temporary
revegetation or other ground
cover) shall be employed to
control erosion from disturbed
areas;
• Inactive construction areas
(previously graded areas
inactive for 10 days or more)
that could contribute sediment
City Engineer Prior to the
issuance of a
grading, excavation,
or building permit
1.f
Packet Pg. 1113 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
to waterways shall be covered
or treated with nontoxic soil
stabilizers;
• Exposed stockpiles of dirt or
other loose, granular
construction materials that
could contribute sediment to
waterways shall be enclosed or
covered;
• The contractor shall ensure
that no earth or organic
material will be deposited or
placed where such materials
may be directly carried into a
stream, marsh, slough, lagoon,
or body of standing water;
• The following types of
materials shall not be rinsed or
washed into the streets,
shoulder areas, or gutters:
concrete, solvents and
adhesives, thinners, paints,
fuels, sawdust, dirt, gasoline,
asphalt and concrete saw
slurry, and heavily chlorinated
water; and
• Grass or other vegetative cover
shall be established on the
construction site as soon as
possible after disturbance.
The applicable BMPs shall be included
via notation on the project Improvement
Plans for review and approval by the
1.f
Packet Pg. 1114 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
City Engineer prior to issuance of a
grading, excavation, or building permit.
X-2. Prior to issuance of a certificate of
occupancy for any component of the
proposed project, the project applicant
shall execute and record a
Maintenance Agreement addressing
future maintenance of the stormwater
treatment measures required to comply
with Provision C.3 of the Municipal
Regional Permit. The Maintenance
Agreement shall be subject to review
and approval by the City Engineer and
the City Attorney’s Office.
X-3. Prior to issuance of a certificate of
occupancy for any component of the
proposed project, the project applicant
shall install all required stormwater
treatment measures, and demonstrate
full compliance with the stormwater
treatment plans prepared for the
proposed project. Evidence of such
shall be submitted to the City Engineer
for review and approval.
City Engineer
City Attorney’s
Office
City Engineer
Prior to issuance of
a certificate of
occupancy for any
component of the
proposed project
Prior to issuance of
a certificate of
occupancy for any
component of the
proposed project
b. Generation of excessive
groundborne vibration or
groundborne noise
levels?
XIII-1. Pile driving shall be prohibited during
construction of the proposed project.
Compliance with such shall be ensured
by the City of Pacific Planning Division.
City of Pacifica
Planning
Division
During construction
of the proposed
project
a,b. Listed or eligible for
listing in the California
Register of Historical
Resources, or in a local
XVIII-1. Implement Mitigation Measures V-1
and V-2.
See Mitigation
Measures V-1
and V-2
See Mitigation
Measures V-1 and
V-2
1.f
Packet Pg. 1115 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Final EIR
570 Crespi Drive Project
September 2025
Chapter 3 – Mitigation Monitoring and Reporting Program
MITIGATION MONITORING AND REPORTING PROGRAM
570 Crespi Drive Project
Impact
Number Impact Mitigation Measures
Monitoring
Agency
Implementation
Schedule Sign-off
register of historical
resources as defined in
Public Resources Code
section 5020.1(k); or a
resource determined by
the lead agency, in its
discretion and supported
by substantial evidence,
to be significant pursuant
to criteria set forth in
subdivision (c) of Public
Resources Code Section
5024.1. In applying the
criteria set forth in
subdivision (c) of Public
Resources Code Section
5024.1, the lead agency
shall consider the
significance of the
resource to a California
Native American tribe.
1.f
Packet Pg. 1116 Attachment: ATT E_Draft Dev Permit Approvals Resolution+COA+MMRP_570 Crespi Drive (1) (6098 :
Project Zoning Summary
Parcel #: 022-162-310, 022-162-420
Location: 540 & 570 Crespi Drive Pacifica, CA 94044
Current Zoning: M-1
Proposed Zoning: C-2
Lot Area (SF): 72,984 S.F.
1.68 Acres
Development Standards per Article 11, C-2 Commecial District and Article 24, Residential Clustered Housing Development Standards. Required: Proposed C-2 Clustered
Housing
Minimum Lot Area (SF) 5,000 72,984
Min Lot Area: 2000 sf per Dwelling Unit: 30,000
Minimum Lot Width (Feet) 50 135
Minimum setback:
Front None 10'
Side None 10'
Rear None 235'-2"
Distance Between Buildings 10' 25'
Maximum Height (Feet) 35' 35'
Landscape and open space reqirements: (see A-1.20 for additional detailed Information) Min Landscape Area: 10% 7,298 7,953.00
Private Open Space 2,790 10,333.75
Usable Open Space 13,350 15,936.38
Proposed Required BMR
BMR Units (15% -8 units or More) 19 Units 3.00 2 (Unit A2 & C2) Proposed Floor Area Total
Bldg A - Commercial (SF) 3,165
Bldg A - Residential (3 Flats)(SF) 3,692
Bldg B - Residential (7 Townhomes)(SF) 16,196
Bldg C - Residential (9 Townhomes)(SF) 20,643
Grand Total 43,696
Required Parking (Sec 9-4.2818) & Parking Report on sheet GB-3.1 Thru GB-3.3 - See full 248 Page Traffic Report Parking # Req'd
Per
Sec 9-4.2818
Parking # Req'd
Per
Parking Report
Parking Provided on
Site
Parking Provided Shared
on Community Center
Site
Residential Townhouses 36.00 32.00 36.00 0
Mixed Use [email protected]/1 bdrm unit 6.00 4 Per report page 23 6.00 0 Mixed Use Building - Commecial @1/300 SF 11.00 4 Per report page 23 5.00 17 Per report page 23 Total Parking: 53 40 47 64
Compact Parking (20% of total allowed) 0 0
Accessible parking (per 15-40 = 2 req'd) 2 2 2 3
EV parking stall 1 1 1 1
EV charging station 2 2 2 2
* Total mixed use parking, incl, 3 offsite. See Parking Report ARCHITECT: EID Architects
Environmental Innovations in Design
412 Olive Avenue
Palo Alto, CA 94306-2225
Phone: (650) 226-8770
Mobile: (650) 793-2856
Email: [email protected]
OWNER:
Brendan Murphy
P.O. Box 301
San Mateo, CA 94401
Phone: (650) 401-3642
Mobile: (650) 430-5200
Fax: (650) 342-4915
Email: [email protected]
STRUCTURAL ENGINEER:
GENERAL CONTRACTOR:
T.B.D.
Phone:
Mobile:
Email:
TRAFFIC/PARKING:
RKH Civil and Transportation Eng.
BIOLOGY
WOOD BIOLOGICAL
GEOTECHNICAL:
Daniel Dyckman
561-D Pilgrim Dr.
Foster City, CA 94404
Phone: (650) 349-3369
Mobile: ()
Email: [email protected]
ARBORIST:
CIVIL ENG.:
Cliff Bechtel & Associates
901 Waltermire St.
Belmont, CA 94002
Phone: (650) -
Mobile: (650) 333-0103
Fax: (650) 637-1059
Email: [email protected]
LANDSCAPE ARCHITECT:
GeoForensics
TBD
P.O. Box 1569
El Granada, CA 94018
Phone: (415) 254-4835
Mobile:
Email: [email protected]
Address
Phone:
Mobile:
Email:
837 Columba Lane
Foster City, CA 94404
Phone: (650) 212-0837
Mobile: (415) 420-3150
Email: [email protected]
SURVEYOR:
B&H Surveying
Dan Bishop
901 Waltermire St.
Belmont, CA 94002
Phone: (650) 637-1590
Mobile:
Email: [email protected]
Advanced Tree Care
P.O.Box 5326
Redwood City, CA 94063
Phone: (650) 839-9539
Mobile: (650) 537-0172
Email: [email protected]
Michael Callan
63 Bovet Rd. #314
San Mateo, CA 94402
Phone: (650) 372-9220
Mobile: (650) 888-9029
Fax: (650) 372-9219
Email: [email protected]
SITE LIGHTING:
CAL LIGHTING
Patrick London
4000 Executive Pkwy, Ste 350
San Ramon, CA 94583
Phone: 925.575.4233
Mobile:
Email: [email protected]
570 CRESPI DRIVE
DRAWING INDEX
VICINITY MAP PROJECT TEAM
540 & 570
CRESPI DR.
PACIFICA, CA
COMMERCIAL & RESIDENTIAL: ZONE M-1 (C-3) PROPOSE TO RE-ZONE TO C-2
TYPE V-B CONSTRUCTION
PLANNING PERMIT # 2016-004
BUILDING PERMIT NUMBER: TBD
APN# 022-162-310, 022-162-420
LOT AREA: 72,984 SF (1.68 ACRE)
Jurisdiction - Town of Pacifica
ALL CONSTRUCTION SHALL COMPLY WITH 2016 CRC, CBC, CPC, CMC, CEC and 2016 California Energy Code, PACIFICA MUNICIPAL CODE, ALL LOCAL AMENDMENTS / ORDINANCES, and ALL LOCAL SUB-TRADE CODES. CONTRACTOR SHALL COMPLY WITH 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE, REFER TO GB SHEETS.
DEFERRED SUBMITTALS FOR THIS PROJECT INCLUDE:
ROOF TRUSSES, FIRE SPRINKLERS, FIRE ALARMS, EVSE (electric vehicle charging stations), SPECIAL INSPECTIONS REQUIRED:
DRILLED PIERS, HIGH STRENGTH CONCRETE, FIELD WELDING, HIGH STRENGTH SHEAR WALLS.
PROJECT DATA SUMMARY #1
FIRE DEPARTMENT NOTES:
• RE: DWG'S. A-1.12a AND A-1.12B AND TM-54 AND NORTH COUNTY FIRE AUTHORITY REQUIREMENTS . • AN N.F.P.A. 13 AUTOMATIC FIRE SPRINKLERS SHALL BE PROVIDED @ COMMERCIAL BUILDING AND COMMON AREAS AT MULTI FAMILY DWELLINGS AN N.F.P.A. 13 FIRE SPRINKLER SYSTEM COMPLYING WITH LOCAL AMENDMENTS. • A FIRE DEPARTMENT ROADWAY ACCESS SERVING DWELLING/STRUCTURE WHOSE EAVES LINES ARE 30 FEET OR LESS IN HEIGHT SHALL HAVE A MINIMUM 24 FOOT UNOBSTRUCTED LINEAR WIDTH. THESE ACCESS ROADS SHALL BE DESIGNATED AS FIRE LANES. ACCESS ROADS SHALL MEET FIRE DEPARTMENT STANDARDS FOR SURFACE TYPES; ALL WEATHER, DISTANCE; NOT EXCEED 150 FEET IN LENGTH WITHOUT AN APPROVED TURNAROUND, WEIGHT LOADS; 75,000 LB. MINIMUM, TURN RADIUS; RADII OF 22.5 INSIDE AND 37.5 OUTSIDE MEASURED FROM THE SAME POINT, GRADES; NOT TO EXCEED 10 PERCENT, CROSS GRADE, INTERSECTIONS AND TURNAROUNDS SHALL BE LEVEL (MAXIMUM 5%) WITH THE EXCEPTION OF CROWNING FOR WATER RUN-OFF AND VERTICAL CLEARANCE; 13.5 MINIMUM.
GEOTECHNICAL NOTE:
• THE GEOTECHNICAL ASPECTS OF THE CONSTRUCTION INCLUDING DEMOLITION AND ROUGH SITE GRADING, AT- GRADE
FOUNDATION EXCAVATIONS, SUBGRADE PREPARATION AND THE INSTALLATION OF SURFACE DRAINAGE CONTROL SYSTEMS, SHOULD BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS PRESENTED IN THE GEOTECHNICAL REPORT. GEOTECHNICAL CONSULTANT SHOULD BE PROVIDED AT LEAST 48 HOURS ADVANCE NOTIFICATION OF ANY GEOTECHNICAL ASPECTS OF THE
CONSTRUCTION AND SHOULD BE PRESENT TO OBSERVE AND TEST, AS NECESSARY, THE EARTHWORK, FOUNDATION, AND DRAINAGE INSTALLATION PHASES OF THE PROJECT.
PROJECT DATA SUMMARY #2
MECHANICAL NOTE:
• ALL PERMANENT MECHANICAL EQUIPMENT, SUCH AS MOTORS, COMPRESSORS, PUMPS, AND COMPACTORS WHICH IS DETERMINED
BY THE BUILDING OFFICIAL TO BE A SOURCE OF STRUCTURAL VIBRATION OR STRUCTURE-BORNE NOISE, SHALL BE SHOCK MOUNTED IN INERTIA BLOCKS OR BASES AND/OR VIBRATION ISOLATORS IN A MANNER APPROVED BY THE BUILDING OFFICIAL.
Re: Sustainability:
a) Near zero energy Architectural design;
b) LED lighting with variety of color spectrum for optimal light color rendition at Indoor/outdoor,
Commercial/Retail/Residential, plaza/pathway,
landscape/building highlighting;
c) Advanced Framing;
d) Reduced Thermal bridging assemblies;
e) Low fly-ash concrete;
f) Recycled Rebar;
g) Hydrophobic U-stucco, with superior Thermal, Fire, Water, Acoustic properties;
h) Translucent Roofing;
i) High quality, Low-E, low glare, fenestration;
j) Rainwater Filtration Roofing assembly;
k) PV Solar arrays;
l) Sun Shading devices on South and West fenestration;
m) High percentage of open space;
n) Enhanced pedestrian and cyclist paths;
o) Increased connectivity of neighborhood paths, plazas, and bicycle parking not reliant on El Camino Real r.o.w.;
p) More comfortable streetscape promenade experience to invite greater likelihood for non-vehicular travel;
q) Permeable paving and expansive, drought tolerant
landscaping for increased groundwater infiltration to earth; r) Eco-balanced vegetation and soil mixtures to foster
pollenating songbirds, animals, and insects;
The Architect will provide professional services of this under California Architect license number C-26427.
PACIFICA, CA 94044
A New Vibrant & Sustainable Mixed Use Community
A unifying theme throughout the project will be the use of sustainable materials and energy efficient technologies. Green building has become more and more mainstream in recent years, thus homeowners and businesses increasingly seek the high level of quality, natural beauty, economic and health benefits that sustainable design and construction entail. Our green design approach is particularly suitable for a community that includes a fifteen percent (15%) affordable housing component.
While all residents of this sustainable community will enjoy lower utility bills (utility bills are reduced by as much as 90% in zero energy homes), this significant monthly savings will be particularly meaningful to low and moderate income residents. The health benefits of sustainable design, such as better indoor air quality resulting from the use of no or low VOC paints and adhesives, are another advantage for sensitive populations. Green Design will support a thriving retail community, as restaurant owners and shopkeepers benefit from reduced utility bills and customers return again and again to enjoy pleasant, daylight-filled spaces.
The retail component of the project will include cutting-edge commercial applications of energy efficient and recycled building materials. Some of the features envisioned for this component include solar electric power systems, high efficiency heating and cooling systems, energy efficient lighting systems, radiant roof barriers, low E windows, solar window shading, and increased insulation and thermally wrapped building envelopes, low VOC interior finishes and recycled building materials and flooring.
The residences will include features such as electric power, high efficiency water heating, structured plumbing with recirculating pumps, high efficiency furnaces with Energy Star thermostats, low E windows, increased insulation, thermally wrapped building envelope, advanced HVAC design, tight ducting, Energy Star appliances, water saving fixtures, high efficiency lighting and ceiling fans.
Landscape elements throughout the entire project will include a variety of drought tolerant native California plants, satellite-controlled irrigation systems (where feasible), porous paving and local materials. Vegetation has been selected to compliment this particular drought tolerant, low water use, natural ecosystem.
Architectural Design
The architectural style for the project is Eco-Functionalism. The project incorporates many ecologically friendly components and synthesizes them in a functional and attractive manner.
PROPOSED SCOPE OF GREEN DESIGN
"GREEN" & COASTAL CHARACTER
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
PHONE: 650-226-8770 WWW.EIDARCHITECTS.COM
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:10:25 AM
COVER SHEET A-0.0 08/15/2022
Sheet No Sheet Name
Architectural
A-0.0 COVER SHEET
A-0.2A CONDITIONS OF APPROVAL
A-0.51 Render 1
A-0.52 Render 2
A-0.53 Render 3
A-0.54 3D VIEWS 1 - OVERALL
A-0.55 3D VIEWS 2 - GROUND LEVEL
A-0.70 EXISTING NEIGHBORHOOD PHOTOS
A-1.1 SITE PLAN
A-1.12a AUTO TURN EXHIBIT
A-1.12b FIRE FLOW REQUUIREMENTS
A-1.13 POTENTIAL ADDITIONAL PARKING EXHIBIT
A-1.14 WETLAND BOUNDARY DELINEATION
A-1.15 SITE ELEVATIONS
A-1.16 SITE ELEVATIONS
A-1.17 PHOTOMETRIC LIGHTING STUDY
A-1.18 SITE PHOTOMETRIC LIGHTING FIXTURE SPEC SHEETS
A-1.20 PROPOSED LANDSCAPE, OPEN SPACE - SITE PLAN
A-1.21 PROPOSED AREA BLOCK DIAGRAM 1ST FLOOR
A-1.22 PROPOSED AREA BLOCK DIAGRAM 2ND FLOOR
A-1.23 PROPOSED AREA BLOCK DIAGRAM 3RD FLOOR
A-1.24 PROPOSED AREA BLOCK DIAGRAM ROOF
A-3.1 BLDG A - COMMERCIAL - FLOOR PLANS
A-3.2 BLDG A - COMMERCIAL - ROOF PLAN
A-3.3 NOT USED
A-3.4 NOT USED
A-3.5 BLDG A - COMMERCIAL - ELEVATIONS NORTH & SOUTH
A-3.6 BLDG A - COMMERICAL - ELEVATIONS EAST & WEST
A-3.7 BLDG A - COMMERCIAL - SECTIONS 1
A-3.8 BLDG A - COMMERICAL - SECTIONS 2
A-4.1 BLDG B - MULTIFAMILY WEST - 1ST & 2ND FLOOR PLANS A-4.2 BLDG B - MULTIFAMILY WEST - 3RD & ROOF FLOOR PLANS SHEET REVISIONS:
1 PLAN CHECK COMMENTS - JUNE 06, 2019
2 PLAN CHECK COMMENTS - JUNE 13, 2019
3 PLAN CHECK COMMENTS - SEPT. 13, 2019
4 PLAN CHECK COMMENTS - NOV. 27, 2019
5 PLAN CHECK COMMENTS - JAN. 20, 2020
6 PLAN CHECK COMMENTS - NOV. 30, 2020
7 PLAN CHECK COMMENTS - JAN. 05, 2021
8 PLAN CHECK COMMENTS - MAR. 10, 2021
8 Sheet No Sheet Name
A-4.3 BLDG B - MULTIFAMILY WEST - ELEVATIONS NORTH & SOUTH A-4.4 BLDG B - MULTIFAMILY WEST - ELEVATIONS EAST & WEST A-4.5 BLDG B - MULTIFAMILY WEST - SECTIONS 1
A-4.6 BLDG B - MULTIFAMILY WEST - SECTIONS 2
A-5.1 BLDG C - MULTIFAMILY EAST - FIRST & SECOND FLOOR PLAN A-5.2 BLDG C - MULTIFAMILY EAST - THIRD AND ROOF DECK FLOOR PLAN
A-5.3 BLDG C - MULTIFAMILY EAST - ELEVATIONS NORTH & SOUTH A-5.4 BLDG C - MULTIFAMILY EAST - ELEVATIONS EAST & WEST A-5.5 BLDG C - MULTIFAMILY EAST - SECTIONS 1
A-5.6 BLDG C - MULTIFAMILY EAST - SECTIONS 2
A-6.1 COLORS AND MATERIALS
A-6.2 COLORS AND MATERIALS
A-7.1 TRASH / RECYCLING ENCLOSURE
A-7.2 MASTER SIGN PROGRAM
GB-3.1 TRAFFIC IMPACT ANALYSIS REPORT
GB-3.2 TRAFFIC IMPACT ANALYSIS REPORT
GB-3.3 TRAFFIC IMPACT ANALYSIS REPORT
Civil
TM-0 TITLE AND TENTATIVE MAP
TM-1 BOUNDARY AND TOPOGRAPHIC SURVEY
TM-2 GRADING AND DRAINAGE PLAN
TM-3 GRADING AND DRAINAGE PLAN
TM-4 GRADING AND DRAINAGE PLAN
TM-5 UTILITY PLAN
TM-6 STORM WATER MANAGEMENT PLAN
TM-7 CIVIL DETAILS
Landscape
L1.1A PLANTING PLAN
L1.1B PLANTING PLAN
L2.0 IRRIGATION PLAN
L2.5 LANDSCAPE NOTES & DETAILS
Total Sheets: 61
(REVISED - APRIL 27, 2021)
9 APPEAL RESUBMITTAL JUNE. 13, 2022
9 1.g
Packet Pg. 1117 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:10:27 AM
08/15/2022 CONDITIONS OF APPROVAL A-0.2A
1 CONDITIONS OF APPROVAL - PLANNING 2
CONDITIONS OF APPROVAL - NORTH COUNTY FIRE
AUTHORITY
1.g
Packet Pg. 1118 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:10:27 AM
Render 1 A-0.51 08/15/2022
1.g
Packet Pg. 1119 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:10:27 AM
Render 2 A-0.52 08/15/2022
1.g
Packet Pg. 1120 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:10:28 AM
Render 3 A-0.53 08/15/2022
1.g
Packet Pg. 1121 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:11:28 AM
3D VIEWS 1 - OVERALL A-0.54 08/15/2022
1 3d view 1
2 3d view 2
1.g
Packet Pg. 1122 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:12:24 AM
3D VIEWS 2 - GROUND LEVEL A-0.55 08/15/2022
1 3D View 3
2 3D View 5
1.g
Packet Pg. 1123 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 4 6
2 5
3 1
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:12:26 AM
EXISTING NEIGHBORHOOD PHOTOS A-0.70 08/15/2022
VIEW - 4VIEW - 3
VIEW - 2
VIEW - 5
VIEW - 6
VIEW - 1
1.g
Packet Pg. 1124 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
x x
EXISTING BUILDING
EXISTING BUILDING
10 10
10 15
15 15
15 9
13 14
11 12
11 12
13 14
16 16
14 16
11 CONC FOOTING
FL
x
WOOD FENCE
TEMPORARY CONSTRUCTION FENCE
CHAIN-LINK FENCE
N 2046375.36
E 5982549.89
COORDINATES
STATE PLANE
COORDINATES
STATE PLANE
N 2046299.07
E 5982446.63
GRD
GRD
GRD
GRD
GRD
GRD
GRD
GRD
GRD
E X I S T I N G B U I L D I N G
GRADE BREAK
GRD
A/C
FL
LG
FL
BURIED
CONC FOOTING
BURIED
CONC FOOTING
GRADE BREAK
SET HUB
& MAG
SET MAG
& SHINER
57.04'
S40°16'00"W
555.59'
55.00' 221.71'
S53°01'00"E
GRADE
BREAK
GRADE
BREAK
RAMP
RAMP
7"TREE
6"TREE
6"TREE
20"PINE
CYPRESS
CLUSTER
26"CYPRESS
8"TREE
10"TREE
2-4"TREE
EDGE BRUSH
EDGE BRUSH
VERY DENSE BRUSH WITH THORNS
EDGE BRUSH
60"CYPRESS
60"CYPRESS
CLUSTER
36"CYPRESS
24"CYPRESS
20"CYPRESS
CONC
BRICK
HANDICAP
RAMP
24" STANDARD CURB GUTTER
CONC SIDEWALK
BROKEN ASPHALT DRIVEWAY
EDGE OF PAVEMENT
CONCRETE
CURB
CONC
CONC
CURB
CONCRETE
CURB
CONC WALK
CONCRETE
CURB
N40°16'00"E
543.30'
S53°01'00"E
80.16'
S40°16'00"W
525.40'
N
65 °2
6'00"W
83.13'
GM
CO
CO
CO
CO
CO
SD
TELE
W
W
W
U
TELE
W
W
HC
VAN
RAMP
UP
12345678
CBA
SLOPE 1%
SLOPE 1%
1234567
E F G H
89 10
#4
#8
#9
#10
#11
#12
#3
#13
#7
#1
#2
#6
#5
3'-0"
ADDRESS, ORIENTATION SIGN
NW S NON-JD
BOUNDARY LINE
15'-0"
12'-0"
15'-0"
16'-0"
153'-11"213'-7"
16'-0" TYP.
7'-6" TYP.
R28'-0"
65° 26' 00"
57.13'
S
E
40° 16' 00"
555.61'
S W
40° 16' 00"
543.30'
N E
40° 16' 00"
525.40'
S W
65° 26' 00"
83.13'
N
W
5 3° 01' 0
0"
8 0.16'
S
E
5 3° 01' 0
0"
5 5.0
9'
S
E
(E) ONE STORY BUILDING
(PACIFICA COMMUNITY CENTER)
(E) ONE STORY BUILDING
C
R
E
S
PI D
R
VI E
05 06
07 08
09 10
11 12
17 16
DROP-OFF
AREA
18 19
20 21
22 0304 02 01
NEW DRIVEWAY
1314
15 23
24 25
29 26
27 28
CRESPI DR VI E
PLANTER
PLANTER PLANTER & SIGNAGE
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER PLANTER PLANTER
PLANTER
PLANTER
PLANTER
PLANTER PLANTER
SIDEWALK
SIDEWALK
SIDEWALK SIDEWALK
N40°16'00"E
543.30'
S53°01'00"E
80.16'
S40°16'00"W
525.40'
N
65 °2
6'00"W
83.13'
50.00 NEW ENTRY DRIVE
EXISTING EXIT/ENTRY DRIVE
EV
HC
VAN
BLDG C
BLDG B
(E) ONE STORY BUILDING
(PACIFICA COMMUNITY CENTER)
(E) ONE STORY BUILDING
(COMMERCIAL)
VACANT / UNDEVELOPED AREA TO REMAIN
p
p
PROPERTY ENTRANCE SIGN -
LIT FROM WITHIN LINEAR LOW
LEVEL LED ON A PHOTOCELL
FOR NIGHT TIME LIGHTING
EXISTING FIRE HYDRANT
LOCATION, RE: CIVIL DWGS
50' - 1"
5' - 0"
5' - 0"
2 WAND EV
CHARGING
STATION
4' - 7"
16 UNIT AC-1
UNIT AC-2
PROPOSED NEW PARKING SPACE
PROPOSED NEW PARKING SPACE
PROPOSED NEW LOOP
DRIVE
AND
DROP-OFF
15' - 0" 10' - 0"
BLDG A
ADDRESS, ORIENTATION SIGN
NOTE:
RE: CIVIL& LANDSCAPE
DRAWINGS FOR
PERMEABLE PAVING
AND MATERIALS
2ND FLOOR ABOVE
UTILITY ACCESS ROCK
DELINEATION LINE
BETWEEN
UNDEVELOPED AREA
PROPERTY
LINE
UTILITY VAULT
BELOW GRADE
NEW FIRE HYDRANT.
RE: CIVIL DWGS.
8' - 8"71' - 9"8' - 9"44' - 6"
5' - 8" 45' - 0"25' - 0"45' - 0" 5' - 8" 4' - 3 3/4"
164' - 5" 58' - 5" 67' - 3 1/2"
125' - 0"
9' - 3 3/8"
10' DEDICATION LINE
RE: CIVIL DWGS.
(E) TREE TO BE
REMOVED
(E) TREE TO
REMAIN
(E) TREE TO
REMAIN
(E) TREES TO
REMAIN
2ND FLOOR ABOVE
(E) TREE TO
REMAIN
(E) ONE STORY BUILDING
(COMMERCIAL)
NEW ENTRY DRIVE
EXISTING EXIT / ENTRY DRIVE
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:12:30 AM
SITE PLAN A-1.1 08/15/2022
1" = 20'-0" 1
OVERALL SITE PLAN
0' 10' 20' 40' 80'
Graphic Scale: 1inch = 20 feet
1.g
Packet Pg. 1125 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) DISTANCE TO FIRE DEPT. APPARATUS
DISTANCE TO FIRE FIRE HYDRANT ACCESS
(400 FT. MAX.)
(150 FT. MAX.) - (MITIGATED BY INSTALLING
NFPA 13 SYSTEM THROUGHOUT).
PLANTER
PLANTER PLANTER & SIGNAGE
PLANTER PLANTER PLANTER
PLANTER
PLANTER
S53°01'00"E
80.16'
S40°16'00"W
525.40'
50.00 NEW ENTRY DRIVE
EXISTING EXIT/ENTRY DRIVE
CRESPI DRIVE
EV
53° 01' 00"
80.16'
S
E 53° 01' 00"
55.09'
S
E
PLANTER PLANTER PLANTER
PLANTER
PLANTER
BIKE RACKS BIKE RACKS
HC
VAN
R28'-0"
15'-0"
16'-0"
153'-11"
PLANTER
PLANTER PLANTER
SIDEWALK
SIDEWALK
SIDEWALK SIDEWALK
CO
TELE
W
W
W
VAN
CO
CO
W
W
TELE
W
W
UP 87 SF
Utility Room
103
BUILDING A - UNIT AC-2
101 11'-2 3/128"
BUILDING A - UNIT AC-2
100
BUILDING A - RETAIL / OFFICE
57 SF
Utility Closet 103
106 SF
All Gender Restroom
103
144 SF
Common Area Lobby
104
2,123.65 SF
789.63 SF
Elevator
1 2
3 4
5678
C B A
SLOPE 1%
SLOPE 1%
1 2
3 4
5 6
7 E F G H
8 910 29'
150' 23'-2"
43'-8" 25'
150'
30'-1"
183'-2" 19' 63'-7"
88'-6"
182' 4'-4"
10'-2" 167'-6"
167'
29'-8"
EDGE OF FIRE
TRUCK FRONT AND
REAR OVERHANG
PATH OF FIRE
TRUCK TIRES
EDGE OF FIRE
TRUCK FRONT AND
REAR OVERHANG
PATH OF FIRE
TRUCK TIRES
+/- 50' FT. +/- 350 FT.
47'-0"
6'
COPYRIGHT © 2022 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE PACIFICA, C A L I F O R N I A 94044
ENVIRONMENTAL INNOVATIONS in DESIGN
412 OLIVE AVE . PALO ALTO CA 94306
PHONE: 650-226-8770 WWW.EIDARCHITECTS.COM
DATE SHEET TITLE SHEET NUMBER
09/05/2023
DIAGRAM
FIRE APPARATUS ACCESS A-1.12a
1.g
Packet Pg. 1126 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2022 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE PACIFICA, C A L I F O R N I A 94044
ENVIRONMENTAL INNOVATIONS in DESIGN
412 OLIVE AVE . PALO ALTO CA 94306
PHONE: 650-226-8770 WWW.EIDARCHITECTS.COM
DATE SHEET TITLE SHEET NUMBER
09/05/2023
REQUIREMENTS
FIRE FLOW A-1.12b
4 CFC 507.3 Fire Flow requirements for buildings or portions of buildings and facilities shall be determined by an approved method or Appendix B. (NOTE: The CFC indicates that the required fire-flow is determined by the area of a building, or a portion of a building if a Fire Wall subdivides that building into separate fire areas. For a site with multiple buildings, the Fire-Flow requirement is not the cumulative total of the required fire-flow of each building, unless conditions indicate an unusual susceptibility to group fires or conflagrations.) Appendix B
B101.1 Scope: The procedure for determining fire-flow requirements for building hereafter constructed shall be in accordance with this appendix.
Table B105.1(1) required fire-flow for Townhomes, automatic sprinklers per 903.3.1.3: 1/2 value in Table B105.1(2)
Table B105.2, required fire-flow for buildings other than Townhomes, automatic sprinklers per 903.3.1.1 & 2: 25% of value on table B105.1(2)
Building area & fire-flow:
Building A: 6,857 sf.
Table B105.1(2): 6,201-7,700 sf Fire-Flow = 2,250 GPM, Duration 2 hrs. Table B105.2 reduces the fire-flow to 25% of the value in table B105.1(2) = 625 GPM. (but shall not be less that 1,500 GPM for Section 903.3.1.1 sprinklers, or not less than 1,500 GPM for Section 903.3.1.2 Sprinklers) = 1,500 GPM Duration 2 hours, Or 1 hr. with firewall b/w each unit from concrete floor slab to underside of roof sheathing.
Building B: 16,196 sf.
Table B105.1(2): 15,601-18,000 Fire-Flow = 3,500 GPM, Duration 3 hours. Table B105.1(1) reduces the fire-flow to 1/2 the value to 2,000 GPM Duration 1 hour, or 1 hr. with firewall b/w each unit from concrete floor slab to underside of roof sheathing.
Building C: 20,643 sf.
Table B105.1(2): 20,601-23,300 Fire-Flow = 4,000 GPM, Duration 4 hours. Table B105.1(1) reduces the fire-flow to 1/2 the value to 2,000 GPM Duration 1 hour, or 1 hr. with firewall b/w each unit from concrete floor slab to underside of roof sheathing.
Number of Hydrants: Table C102.1: 1,750 or less, 1 hydrant, average spacing between hydrants: 500 feet, maximum spacing from any point on a street to a hydrant: 250 feet. (plus 25% increase to both distances for Section 903.3.1.2 or .3 automatic sprinkler systems.) SUMMARY:
7 7
1.g
Packet Pg. 1127 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
PLANTER
PLANTER PLANTER & SIGNAGE
PLANTER PLANTER PLANTER
PLANTER
PLANTER N40°16'00"E
543.30'
S53°01'00"E
80.16'
S40°16'00"W
525.40'
N65°26'00"W
83.13'
50.00 NEW ENTRY DRIVE
EXISTING EXIT/ENTRY DRIVE
CRESPI DRIVE
EV
SUNRISE
29° South East 7:20 12/21
31° North East 4:49 6/21 EAST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
(E) ONE STORY BUILDING
(PACIFICA COMMUNITY CENTER)
65° 26' 00" 57.13'
S
E
40° 16' 00"
555.61'
S W
40° 16' 00"
543.30'
N E
40° 16' 00"
525.40'
S W
65° 26' 00" 83.13'
N
W
53° 01' 00"
80.16'
S
E 53° 01' 00"
55.09'
S
E CRESPI DRIVE
05 06
07 08
09 10
11 12
17 16
DROP-OFF AREA
18 19
20 21
22 PLANTER PLANTER PLANTER
PLANTER
PLANTER
BIKE RACKS BIKE RACKS
HC
VAN
04 03 02 01
R28'-0"
(E) PARKING LOT
(PACIFICA COMMUNITY CENTER)
NEW DRIVEWAY
15'-0"
12'-0"
15'-0"
16'-0"
213'-7" 153'-11"
NW S NON-JD
BOUNDARY LINE
PLANTER
PLANTER PLANTER
SIDEWALK
SIDEWALK
SIDEWALK SIDEWALK
14 13
15 23
24 25
29 26
27 28
16'-0" TYP.
7'-6" TYP.
ADDRESS, ORIENTATION SIGN
#4
#8
#9
#10
#11
#12
#3
#13
#7
#1
#2
#6
#5
3'-0"
CO
TELE
W
W
W
W
HC
VAN
RAMP UP
U
CO
CO
W
W
TELE
W
W
UP 87 SF
Utility Room
103
BUILDING A - UNIT AC-2
101 11'-2 3/128"
BUILDING A - UNIT AC-2
100
BUILDING A - RETAIL / OFFICE
57 SF
Utility Closet 103
106 SF
All Gender Restroom
103
144 SF
Common Area Lobby
104
2,123.65 SF
789.63 SF
Elevator
1 2
3 4
5678
C B A
SLOPE 1%
SLOPE 1%
1 23
4 567
E F G H
8910
1 A-1.14
NOTE:
RE: CIVIL & LANDSCAPE
DWG'S. FOR PERMEABLE
PAVING MATERIALS.
3 A-1.14
2 A-1.14
1 A-1.14
P
WETLAND
DELINEATION LINE
EXISTING
ARROYO WILLOW
BOUNDARY LINE
P P
AREA OF ARROYO WILLOW
TO BE RELOCATED
784 SF.
PROPOSED ADDED
AREA OF ARROYO
WILLOW
448 SF.
PROPOSED ADDED
AREA ARROYO
WILLOW
800 SF.
LEGEND OF ARROYO WILLOW AREAS:
PROPOSED ADDED
AREA
PROPOSED AREA
TO RELOCATE
EXISTING AREA TO
REMAIN
1170 SF.
784 SF.
ARROYO WILLOW SUBTOTAL: 3306 SF.
1703 SF.
EXISTING AREA 2603 SF.
(27 % INCREASE)
GRASSPAVE, RE:
CIVIL DWG'S.
GRASSPAVE, RE: CIVIL
DWG'S.
(E) WOOD FENCE
WETLAND
DELINEATION LINE
WETLAND DELINEATION
LINE
(JURISD. WETLAND)
(E) CL FENCE
NON-JURISD.
ORNAMENTAL TREES
SP-3
SP-2
SP-1
EMERGENCY OVERFLOW
18" RISER
WITH ATRIUM BASKET GRATE
RIM 10.0
INV 8.0
CITY EQUALIZATION PROJECT
57 INCH SD PER CITY MAPS
12 INCH HDPE
S=2% MIN.
(E)CITY BIOTREATMENT AREA
S = 2% MIN.
(E) TREE TO BE
REMOVED
CANTILEVERED WALKWAY CANTILEVERED
WALKWAY
PERMEABLE PAVED
WALKWAY
PERMEABLE PAVED
DRIVEWAY APRON
PERMEABLE PAVED
PARKING SPACES
(E) TREE TO
REMAIN
COPYRIGHT © 2022 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE PACIFICA, C A L I F O R N I A 94044
ENVIRONMENTAL INNOVATIONS in DESIGN
412 OLIVE AVE . PALO ALTO CA 94306
PHONE: 650-226-8770 WWW.EIDARCHITECTS.COM
DATE SHEET TITLE SHEET NUMBER
09/05/2023
PARKING EXHIBIT
POTENTIAL ADDITIONAL A-1.13
1.g
Packet Pg. 1128 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 3'-0" 3'-0" 3'-0" 3'-6"MIN.
WALKING SURFACE
2" SQ. HOLLOW STL. TOP RAIL
2"x1 1/2" HOLLOW STL. BOTTOM RAIL
1/8" DIA. STRANDED STL CABLE
SPACED SO THAT A 4" DIA.
OBJECT CANNOT PASS THROUGH
3 1/2" 4" MAX. 4" MAX. 4" MAX. 4" MAX. 4" MAX. 4" MAX. 4" MAX. 4" MAX. 4" MAX.
1" Wx1/8" THK STEEL STIFFENER
3/4" X 2" STEEL BALUSTER
REQUIRED GUARDS SHALL NOT
HAVE OPENINGS THAT ALLOW
PASSAGE OF A SPHERE 4" IN
DIAMETER PER CRC R312.1.3.
PLANTER
PLANTER PLANTER & SIGNAGE
PLANTER PLANTER PLANTER
PLANTER
PLANTER N40°16'00"E
543.30'
S53°01'00"E
80.16'
S40°16'00"W
525.40'
N65°26'00"W
83.13'
50.00 NEW ENTRY DRIVE
EXISTING EXIT/ENTRY DRIVE
CRESPI DRIVE
EV
SUNRISE
29° South East 7:20 12/21
31° North East 4:49 6/21 EAST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
(E) ONE STORY BUILDING
(PACIFICA COMMUNITY CENTER)
(E) ONE STORY BUILDING
(COMMERCIAL)
65° 26' 00" 57.13'
S
E
40° 16' 00"
555.61'
S W
40° 16' 00"
543.30'
N E
40° 16' 00"
525.40'
S W
65° 26' 00" 83.13'
N
W
53° 01' 00"
80.16'
S
E 53° 01' 00"
55.09'
S
E CRESPI DRIVE
05 06
07 08
09 10
11 12
17 16
DROP-OFF AREA
18 19
20 21
22 PLANTER PLANTER PLANTER
PLANTER
PLANTER
BIKE RACKS BIKE RACKS
HC
VAN
04 03 02 01
R28'-0"
(E) PARKING LOT
(PACIFICA COMMUNITY CENTER)
NEW DRIVEWAY
15'-0"
12'-0"
15'-0"
16'-0"
213'-7" 153'-11"
NW S NON-JD
BOUNDARY LINE
PLANTER
PLANTER PLANTER
SIDEWALK
SIDEWALK
SIDEWALK SIDEWALK
14 13
15 23
24 25
29 26
27 28
16'-0" TYP.
7'-6" TYP.
PROPERTY ENTRANCE SIGN - LIT FROM WITHIN LINEAR LOW LEVEL LED ON A
PHOTOCELL FOR NIGHT TIME LIGHTING
ADDRESS, ORIENTATION SIGN
#4
#8
#9
#10
#11
#12
#3
#13
#7
#1
#2
#6
#5
3'-0"
CO
TELE
W
W
W
W
HC
VAN
RAMP UP
U
CO
CO
W
W
TELE
W
W
UP 87 SF
Utility Room
103
BUILDING A - UNIT AC-2
101 11'-2 3/128"
BUILDING A - UNIT AC-2
100
BUILDING A - RETAIL / OFFICE
57 SF
Utility Closet 103
106 SF
All Gender Restroom
103
144 SF
Common Area Lobby
104
2,123.65 SF
789.63 SF
Elevator
1 2
3 4
5678
C B A
SLOPE 1%
SLOPE 1%
1 23
4 567
E F G H
8910
BLDG B
BLDG C
BLDG A
1 A-1.14
NOTE:
RE: CIVIL & LANDSCAPE
DWG'S. FOR PERMEABLE
PAVING MATERIALS.
3 A-1.14
2 A-1.14
1 A-1.14
P
WETLAND
DELINEATION LINE
EXISTING
ARROYO WILLOW
BOUNDARY LINE
P P
AREA OF ARROYO WILLOW
TO BE RELOCATED
784 SF.
PROPOSED ADDED
AREA OF ARROYO
WILLOW
448 SF.
PROPOSED ADDED
AREA ARROYO
WILLOW
800 SF.
LEGEND OF ARROYO WILLOW AREAS:
PROPOSED ADDED
AREA
PROPOSED AREA
TO RELOCATE
EXISTING AREA TO
REMAIN
1170 SF.
784 SF.
ARROYO WILLOW SUBTOTAL: 3306 SF.
1703 SF.
EXISTING AREA 2603 SF.
(27 % INCREASE)
GRASSPAVE, RE:
CIVIL DWG'S.
GRASSPAVE, RE: CIVIL
DWG'S.
(E) WOOD FENCE
WETLAND
DELINEATION LINE
WETLAND DELINEATION
LINE
(JURISD. WETLAND)
(E) CL FENCE
(E) WOOD FENCE
GATE
NON-JURISD.
ORNAMENTAL TREES
SP-3
SP-2
SP-1
EMERGENCY OVERFLOW
18" RISER
WITH ATRIUM BASKET GRATE
RIM 10.0
INV 8.0
EXISTING 24" SD PER
CITY EQUALIZATION PROJECT
PLANS (SHEET C-60)
57 INCH SD PER CITY MAPS
CONNECT TO EXISTING 24" SD
PER CITY REQUIREMENTS
12 INCH HDPE
S=2% MIN.
(E)CITY BIOTREATMENT AREA
S = 2% MIN.
NOTE:
RE: TM-03 FOR ADDITIONAL
UTILITY INFORMATION
(E) TREE TO BE
REMOVED
CANTILEVERED WALKWAY CANTILEVERED
WALKWAY
PERMEABLE PAVED
WALKWAY
PERMEABLE PAVED
DRIVEWAY APRON
PERMEABLE PAVED
PARKING SPACES
(E) TREE TO
REMAIN 6"
6"
3'-0"
6" CONCRETE WALL PER
STRUCTURAL DETAILS (TYP.)
PREVIOUS PAVEMENT SECTION
SLOPE TO DRAIN
DRIP THROUGH BOADWALK, 1X6
TIMBERTECH AZEK OR EQ. ; VINTAGE
COLLECTION COASTLINE COLOR WITH
HIDDEN STAINLESS STEEL FASTENERS.
POWDER COATED FLAT STEEL POSTS AND TOP
RAIL WITH CABLES; FEENLEY CABLES OR EQ.
(E) WETLANDS OR
ARROYO WILLOW
AREA
2x FASCIA BD.
PROPOSED
GRADE
OPTIONAL CORTEN STL. PLATE INTERPRETIVE
SIGN BOLTED TO RAILING BAR
WETLAND
DELINEATION LINE
COPYRIGHT © 2022 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE PACIFICA, C A L I F O R N I A 94044
ENVIRONMENTAL INNOVATIONS in DESIGN
412 OLIVE AVE . PALO ALTO CA 94306
PHONE: 650-226-8770 WWW.EIDARCHITECTS.COM
DATE SHEET TITLE SHEET NUMBER
09/05/2023
DELINEATION
WETLAND BOUNDARY A-1.14
1.g
Packet Pg. 1129 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:13:40 AM
SITE ELEVATIONS A-1.15 08/15/2022
3/32" = 1'-0" 1
Site - South Elevation
3/32" = 1'-0" 2
Site - North Elevation
1.g
Packet Pg. 1130 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:14:51 AM
SITE ELEVATIONS A-1.16 08/15/2022
3/32" = 1'-0" 1
Site - East Elevation
3/32" = 1'-0" 2
Site - West Elevation
1.g
Packet Pg. 1131 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 1 2345678
CBA
1234567
E F G H
89 10
p
p
p
p
p
p
p
p p p
A
B
C
0.0 0.9
1.4 2.6
2.6 2.6
2.6 2.5
2.5 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.1
2.4 3.3
4.0 4.3
4.0 1.6
1.6 1.4
1.1 2.3
3.1 3.8
4.1 3.8
2.4 2.4
2.0 1.6
2.3 3.2
3.9 4.1
3.9 3.3
3.3 2.8
2.1 2.4
3.4 4.2
4.5 4.2
4.0 4.0
3.4 2.5
2.5 3.5
4.4 4.6
4.4 4.3
4.2 3.6
2.6 2.5
3.5 4.3
4.6 4.3
4.2 4.1
3.5 2.6
2.4 3.3
4.0 4.3
4.0 4.0
3.9 3.4
2.6 2.3
3.2 3.8
4.1 3.8
4.0 3.9
3.4 2.6
2.3 3.2
3.9 4.2
3.9 4.3
4.2 3.6
2.7 2.4
3.4 4.2
4.5 4.2
4.6 4.5
3.8 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.2 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.2
3.9 4.3
4.3 3.6
2.8 2.5
3.4 4.2
4.5 4.2
4.6 4.5
3.9 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.2 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.2
3.9 4.3
4.3 3.7
2.8 2.5
3.4 4.2
4.5 4.2
4.6 4.5
3.9 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.2 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.2
3.9 4.4
4.3 3.7
2.8 2.5
3.4 4.2
4.5 4.2
4.6 4.5
3.9 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.2 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.2
3.9 4.3
4.3 3.7
2.8 2.4
3.4 4.2
4.5 4.2
4.6 4.5
3.9 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.1 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.1
3.9 4.3
4.3 3.6
2.8 2.4
3.3 4.1
4.5 4.1
4.6 4.5
3.9 2.9
2.5 3.5
4.3 4.6
4.3 4.6
4.5 3.9
2.9 2.5
3.4 4.3
4.6 4.3
4.3 4.3
3.6 2.7
2.4 3.2
4.0 4.3
4.0 4.0
4.0 3.4
2.6 2.2
3.1 3.7
4.0 3.7
3.9 3.9
3.4 2.6
2.2 3.1
3.7 4.0
3.7 4.2
4.1 3.5
2.6 2.3
3.2 4.0
4.3 4.0
4.3 4.2
3.6 2.7
2.3 3.2
4.0 4.3
4.0 4.1
4.1 3.5
2.5 2.1
3.0 3.7
4.0 3.7
3.5 3.5
2.9 2.2
1.7 2.4
3.0 3.2
3.0 2.7
2.6 2.2
1.7 1.3
1.8 2.2
2.3 2.1
1.9 1.8
1.6 1.2
0.9 1.2
1.4 1.5
1.4 1.4
1.3 1.1
0.9 1.3
1.1 0.9
0.7 1.4
1.1 0.8
0.6 1.5
1.2 0.9
0.7 2.2
1.8 1.5
1.2 2.7
2.4 2.0
1.7 3.2
2.9 2.5
2.1 6.6
7.6 8.0
8.2 8.3
8.3 8.3
8.5 8.5
8.8 7.9
6.9 5.8
6.8 7.1
7.4 7.5
7.6 7.6
7.8 7.8
8.0 7.3
6.5 5.1
6.0 6.0
6.2 6.2
6.2 6.3
6.6 6.7
7.0 6.3
5.5 4.5
5.3 5.0
5.0 4.7
4.7 4.9
5.3 5.5
5.9 5.1
4.4 4.1
4.7 4.1
3.9 3.5
3.4 3.7
4.1 4.5
5.0 4.2
3.4 2.5
3.2 3.7
4.1 3.4
3.2 2.6
2.5 2.8
3.3 3.7
4.1 3.4
2.6 2.1
2.7 3.1
3.5 2.8
2.5 2.0
1.8 2.1
2.6 3.0
3.5 2.9
2.1 2.5
3.1 2.4
2.0 1.5
1.2 1.5
2.1 2.7
3.3 2.7
2.0 2.1
2.7 2.1
1.7 1.1
0.9 1.3
1.9 2.5
3.2 2.6
2.1 1.9
2.4 1.9
1.4 1.0
0.8 1.0
1.7 2.3
3.1 2.8
2.3 1.8
2.4 1.8
1.3 0.9
0.7 0.9
1.6 2.1
3.0 2.7
2.2 1.9
2.5 1.9
1.4 0.9
0.6 0.9
1.6 2.1
2.8 2.3
1.8 2.2
2.7 2.0
1.5 0.9
0.7 0.9
1.5 2.0
2.6 2.0
1.4 1.5
2.1 2.5
2.8 2.0
1.5 0.8
0.7 0.9
1.3 1.9
2.4 1.8
1.1 1.6
2.1 2.5
2.8 2.0
1.5 0.8
0.7 0.9
1.3 1.8
2.3 1.7
1.0 1.3
1.8 2.2
2.7 2.0
1.5 0.9
0.6 0.8
1.3 1.9
2.4 1.8
1.1 1.9
2.5 1.9
1.4 0.9
0.6 0.9
1.5 2.0
2.6 2.0
1.4 1.8
2.4 1.8
1.3 0.9
0.6 0.9
1.5 2.0
2.7 2.3
1.8 1.8
2.3 1.8
1.3 0.9
0.7 0.8
1.5 2.0
2.8 2.5
2.1 1.9
2.4 1.9
1.4 0.8
0.6 0.9
1.5 2.0
2.8 2.4
2.0 2.0
2.6 2.0
1.5 0.9
0.7 0.9
1.5 2.0
2.6 2.1
1.6 2.4
2.8 2.0
1.5 0.9
0.6 0.9
1.4 1.9
2.5 1.9
1.2 1.6
2.2 2.5
2.8 2.0
1.5 0.8
0.7 0.9
1.3 1.8
2.3 1.7
1.1 1.4
1.9 2.4
2.7 2.0
1.5 0.9
0.6 0.9
1.3 1.8
2.3 1.8
1.1 2.0
2.6 2.0
1.5 0.9
0.6 0.8
1.4 1.9
2.5 1.9
1.3 1.8
2.4 1.9
1.4 0.8
0.6 0.9
1.5 2.0
2.7 2.1
1.6 1.7
2.3 1.8
1.3 0.9
0.6 0.9
1.5 2.0
2.8 2.4
2.0 1.8
2.3 1.8
1.3 0.9
0.7 0.8
1.5 2.0
2.8 2.5
2.1 1.9
2.5 1.9
1.4 0.9
0.7 0.9
1.5 2.0
2.7 2.3
1.8 2.2
2.7 2.0
1.5 0.9
0.7 0.9
1.4 1.9
2.6 2.0
1.4 1.5
2.1 2.5
2.8 2.0
1.5 0.9
0.7 0.8
1.3 1.8
2.4 1.8
1.1 1.6
2.1 2.5
2.8 2.0
1.5 0.8
0.6 0.9
1.3 1.8
2.3 1.7
1.0 1.3
1.8 2.2
2.7 2.0
1.5 0.9
0.6 0.8
1.3 1.8
2.4 1.8
1.1 2.0
2.6 1.9
1.4 0.8
0.6 0.9
1.4 1.9
2.6 2.0
1.4 1.8
2.4 1.8
1.3 0.9
0.6 0.9
1.5 2.0
2.7 2.3
1.8 1.8
2.4 1.8
1.3 0.9
0.7 0.8
1.5 2.0
2.8 2.5
2.1 1.9
2.5 1.9
1.4 0.8
0.6 0.9
1.5 2.0
2.7 2.4
2.0 2.1
2.7 2.0
1.5 0.9
0.7 0.9
1.5 2.0
2.6 2.1
1.6 2.4
2.8 2.0
1.5 0.9
0.6 0.9
1.4 1.9
2.5 1.8
1.2 1.6
2.2 2.5
2.8 2.0
1.5 0.8
0.7 0.9
1.3 1.8
2.3 1.7
1.0 1.4
1.9 2.3
2.7 2.0
1.5 0.9
0.6 0.9
1.3 1.8
2.3 1.7
1.0 2.0
2.6 2.0
1.5 0.9
0.6 0.8
1.4 1.9
2.5 1.9
1.2 1.8
2.4 1.9
1.4 0.8
0.6 0.9
1.5 2.0
2.7 2.2
1.6 1.7
2.2 1.8
1.3 0.9
0.7 0.9
1.6 2.1
2.9 2.7
1.9 1.7
2.3 1.8
1.4 1.0
0.8 1.0
1.7 2.2
3.1 2.9
2.0 1.8
2.4 1.9
1.5 1.1
0.9 1.1
1.8 2.4
3.3 3.1
2.9 2.1
2.6 2.0
1.6 1.2
1.1 1.4
2.1 2.7
3.5 3.3
3.0 1.5
2.0 2.4
2.6 1.9
1.7 1.2
1.3 1.7
2.4 3.1
3.8 3.7
3.4 1.5
2.1 2.3
2.6 1.9
1.7 1.3
1.5 2.1
2.8 3.5
4.2 4.3
4.2 1.3
1.7 2.0
2.5 1.9
1.8 1.5
1.8 2.5
3.3 4.1
4.8 5.0
5.1 0.9
1.2 1.7
2.2 1.8
1.8 1.8
2.2 3.0
3.8 4.7
5.4 5.8
6.1 6.3
1.1 1.3
1.6 1.3
1.7 1.9
1.7 1.3
1.1 1.1
1.3 1.6
1.9 1.8
1.4 1.0
0.8 0.6
0.4 0.4
0.3 0.2
0.2 0.2
0.7 0.9
1.4 1.8
1.7 1.8
2.0 2.6
3.5 4.4
5.4 6.1
6.6 6.9
7.1 3.6
1.8 6.9
6.6 6.2
5.7 1.1
1.4 1.7
1.7 2.1
2.3 2.2
2.0 1.9
1.9 2.0
2.2 2.5
2.4 2.0
1.7 1.4
1.1 0.8
0.7 0.6
0.5 0.4
0.3 0.6
0.7 1.1
1.5 1.5
1.8 2.2
2.9 3.9
4.9 6.0
6.8 7.3
7.6 7.8
7.8 3.9
7.7 7.3
6.9 6.5
1.4 1.6
1.7 1.9
1.5 1.2
1.0 0.9
0.7 0.6
0.5 0.5
0.6 0.9
1.2 1.4
1.8 2.3
3.1 4.2
5.3 6.4
7.3 7.9
8.3 8.6
8.7 4.4
8.5 8.1
7.6 7.0
1.9 2.3
2.2 2.0
1.7 1.5
1.3 1.2
1.0 0.8
0.6 0.6
0.6 0.7
1.0 1.4
1.8 2.5
3.3 4.3
5.6 6.7
7.6 8.3
8.8 9.4
9.5 9.4
9.3 8.9
8.1 7.4
2.5 2.8
2.6 2.1
1.8 1.7
1.5 1.3
1.1 0.9
0.7 0.6
0.6 0.7
0.9 1.3
1.8 2.5
3.4 4.4
5.7 6.8
7.7 8.4
9.1 9.7
9.9 9.8
9.7 9.2
8.3 7.5
6.7 5.9
5.0 4.0
3.1 2.4
1.8 1.4
1.2 1.1
1.1 1.1
1.2 3.1
3.3 3.2
2.3 2.2
2.0 1.9
1.6 1.3
1.1 0.9
0.7 0.6
0.7 0.9
1.2 1.7
2.5 3.4
4.5 5.7
6.8 7.6
8.3 9.1
9.8 10.1
10.0 9.8
9.2 8.3
7.5 6.8
6.0 5.0
4.1 3.2
2.5 2.0
1.6 1.5
1.5 1.6
1.8 3.0
3.2 3.2
3.2 0.3
0.3 0.4
0.4 0.5
0.5 0.6
0.6 0.7
0.9 1.1
1.4 1.8
2.2 2.4
2.6 2.7
2.6 2.5
2.3 2.0
1.7 1.3
1.1 0.9
0.7 0.7
0.8 1.2
1.7 2.5
3.4 4.5
5.8 6.9
7.8 8.5
9.3 10.1
10.3 10.3
10.0 9.5
8.5 7.7
7.0 6.2
5.2 4.2
3.4 2.8
2.3 2.1
2.0 2.1
2.3 3.2
3.5 3.6
3.7 3.6
3.6 3.3
3.0 2.6
0.2 0.3
0.4 0.4
0.5 0.6
0.7 0.8
1.0 1.2
1.5 1.8
2.3 2.7
3.1 3.4
3.5 3.4
3.2 2.9
2.5 2.1
1.7 1.3
1.0 0.8
0.7 0.8
1.2 1.7
2.5 3.5
4.6 5.9
7.0 7.9
8.6 9.2
9.7 9.9
9.8 9.6
9.2 8.5
7.8 7.1
6.3 5.3
4.4 3.6
3.1 2.7
2.6 2.6
2.8 3.1
3.7 4.0
4.1 4.1
4.1 4.1
3.9 3.6
3.3 0.2
0.3 0.3
0.5 0.6
0.7 0.9
1.2 1.4
1.8 2.1
2.5 3.0
3.5 3.9
4.3 4.4
4.3 4.1
3.7 3.2
2.7 2.2
1.7 1.3
1.0 0.8
0.9 1.1
1.7 2.5
3.4 4.6
5.8 6.9
7.8 8.4
8.8 9.0
9.2 9.1
8.9 8.6
8.2 7.7
7.0 6.2
5.3 4.5
3.8 3.4
3.2 3.2
3.3 3.6
4.1 4.6
5.0 5.3
5.4 5.4
5.3 4.9
4.5 4.0
0.2 0.3
0.4 0.6
0.8 1.0
1.3 1.6
2.0 2.4
2.9 3.3
3.8 4.4
4.9 5.3
5.5 5.4
5.1 4.6
4.0 3.4
2.8 2.1
1.6 1.1
1.0 0.9
1.1 1.6
2.3 3.3
4.3 5.4
6.4 7.2
7.8 8.2
8.5 8.6
8.6 8.4
8.1 7.7
7.2 6.6
5.8 5.0
4.4 3.9
3.7 3.6
3.7 4.0
4.5 5.1
5.7 6.2
6.6 6.9
6.9 6.7
6.3 5.7
5.1 0.2
0.3 0.5
0.7 0.9
1.2 1.7
2.2 2.7
3.2 3.7
4.2 4.8
5.4 5.9
6.4 6.6
6.5 6.2
5.7 5.0
4.2 3.4
2.6 2.0
1.4 1.1
1.1 1.2
1.5 2.1
2.9 3.8
4.7 5.5
6.3 7.0
7.5 7.8
8.0 8.0
7.8 7.5
7.1 6.5
5.9 5.2
4.6 4.2
3.9 3.9
4.0 4.3
4.8 5.4
6.1 6.7
7.2 7.6
7.9 7.9
7.8 7.4
6.9 6.3
0.3 0.4
0.6 0.8
1.1 1.5
2.1 2.7
3.3 4.0
4.6 5.2
5.7 6.2
6.8 7.3
7.5 7.4
7.1 6.7
6.1 5.1
4.1 3.1
2.4 1.7
1.3 1.1
1.2 1.4
1.9 2.5
3.2 3.9
4.6 5.2
5.9 6.5
6.9 7.2
7.3 7.0
6.6 6.2
5.6 5.0
4.4 4.0
3.8 3.8
3.9 4.2
4.7 5.4
6.2 6.9
7.4 7.9
8.2 8.4
8.5 8.4
8.2 7.8
7.2 0.3
0.5 0.7
0.9 1.3
1.8 2.4
3.1 3.9
4.7 5.4
6.0 6.6
6.9 7.4
8.0 8.3
8.2 7.8
7.6 7.0
6.1 4.9
3.7 2.8
2.1 1.5
1.2 1.2
1.3 1.6
2.1 2.6
3.1 3.6
4.2 4.7
5.1 5.5
5.8 5.8
5.7 5.4
5.0 4.5
4.1 3.7
3.4 3.4
3.5 3.8
4.3 5.0
5.9 6.7
7.5 8.0
8.4 8.8
9.0 9.1
9.0 8.8
8.4 7.9
0.4 0.6
0.8 1.1
1.5 2.1
2.8 3.5
4.4 5.3
6.1 6.8
7.3 7.7
8.1 8.7
9.0 8.9
8.6 8.2
7.8 7.0
5.7 4.3
3.3 2.5
1.8 1.4
1.2 1.2
1.4 1.6
2.0 2.4
2.8 3.2
3.6 3.9
4.1 4.3
4.3 4.2
4.1 3.9
3.5 3.2
3.0 2.8
2.9 3.2
3.6 4.2
5.1 6.1
7.0 7.7
8.4 8.9
9.5 9.8
9.8 9.6
9.3 8.8
8.2 0.5
0.7 1.0
1.4 1.8
2.4 3.1
4.0 4.9
5.8 6.7
7.5 8.2
8.7 9.1
9.7 10.0
9.5 9.2
8.8 8.3
7.7 6.4
5.0 3.7
2.8 2.1
1.5 1.2
1.2 1.2
1.4 1.6
1.8 2.1
2.4 2.7
2.9 3.0
3.1 3.1
3.1 3.1
2.9 2.7
2.5 2.3
2.3 2.5
2.9 3.4
4.2 5.1
6.1 7.0
7.7 8.4
9.3 10.0
10.3 10.3
10.2 9.8
8.9 8.1
0.6 0.9
1.3 1.7
2.2 2.9
3.6 4.5
5.4 6.5
7.4 8.2
9.0 9.8
10.2 10.5
10.8 10.4
9.9 9.3
8.7 8.0
6.9 5.4
4.1 3.1
2.3 1.7
1.3 1.2
1.1 1.2
1.2 1.4
1.5 1.7
1.9 2.1
2.2 2.2
2.3 2.3
2.2 2.2
2.0 1.8
1.7 1.8
2.2 2.6
3.2 4.0
5.0 6.0
6.8 7.5
8.2 9.2
10.0 10.4
10.4 10.2
9.6 8.7
7.9 0.8
1.1 1.6
2.1 2.7
3.5 4.3
5.2 6.2
7.2 8.1
8.9 9.8
10.6 11.0
11.1 11.3
11.0 10.4
9.7 9.0
8.2 7.2
5.8 4.4
3.4 2.5
1.8 1.4
1.2 1.1
1.0 1.1
1.2 1.2
1.2 1.3
1.4 1.5
1.5 1.6
1.6 1.6
1.5 1.4
1.4 1.4
1.5 2.0
2.5 3.1
4.0 4.9
5.9 6.8
7.5 8.3
9.2 9.9
10.1 10.2
10.1 9.6
1.0 1.4
1.9 2.6
3.4 4.2
5.1 6.0
7.0 8.0
9.0 9.8
10.5 11.3
11.7 11.7
11.6 11.4
10.9 10.0
9.3 8.4
7.3 6.0
4.7 3.6
2.7 1.9
1.5 1.2
1.1 1.0
1.0 1.0
0.9 0.9
0.9 0.9
1.0 1.0
1.2 1.2
1.2 1.1
1.1 1.1
1.1 1.3
1.8 2.5
3.1 4.0
4.9 5.9
6.8 7.6
8.3 9.2
9.7 9.9
10.0 10.0
9.4 1.2
1.7 2.4
3.2 4.1
5.0 5.9
6.8 7.9
8.9 9.9
10.6 7.4
3.2 12.3
12.3 11.9
11.4 10.9
10.1 9.4
8.6 7.5
6.1 4.8
3.7 2.8
2.1 1.6
1.3 1.1
1.0 0.9
1.0 0.7
0.7 0.7
0.7 0.7
0.9 1.0
1.0 1.0
1.0 0.9
0.9 1.0
1.2 1.8
2.4 3.1
4.0 4.9
5.9 6.7
7.5 8.1
8.7 9.1
9.4 5.0
9.4 8.9
1.4 2.1
2.8 3.8
4.8 5.9
6.8 7.7
8.7 9.9
7.8 4.8
8.3 12.4
12.6 12.7
12.1 11.2
10.5 10.0
9.4 8.5
7.4 6.2
4.9 3.9
2.9 2.2
1.8 1.5
1.2 1.1
1.0 0.8
0.7 0.5
0.5 0.5
0.6 0.9
0.9 1.0
1.0 0.9
0.8 0.9
1.0 1.2
1.6 2.3
3.1 3.9
4.8 5.7
6.5 7.1
7.7 8.1
8.5 8.6
0.6 8.6
8.3 1.7
2.4 3.3
4.3 5.5
6.7 7.7
8.6 9.5
10.6 8.8
9.1 12.7
12.9 12.9
12.5 12.1
11.1 10.3
9.6 9.0
8.2 7.2
6.0 4.9
3.9 3.0
2.4 2.0
1.6 1.4
1.2 1.2
0.8 0.8
0.4 0.5
0.5 0.7
1.0 1.0
1.0 1.1
1.1 0.9
0.9 1.0
1.1 1.6
2.3 2.8
3.8 4.6
5.4 6.1
6.7 7.1
7.5 7.8
8.0 0.8
8.0 7.7
1.9 2.7
3.7 4.9
6.1 7.4
8.5 9.3
10.1 11.0
12.0 12.8
13.2 13.2
13.0 12.5
11.8 11.1
10.1 9.2
8.4 7.6
6.6 5.7
4.7 3.8
3.1 2.5
2.1 1.8
1.6 1.4
0.9 0.9
0.9 0.4
0.5 0.7
1.1 1.2
1.2 1.2
1.2 1.3
1.3 1.0
1.0 1.1
1.6 2.2
2.7 3.4
4.3 4.9
5.5 6.0
6.5 6.9
7.2 4.2
1.0 7.3
7.1 2.2
3.1 4.1
5.3 6.7
7.9 9.0
9.9 10.4
11.1 12.1
13.0 13.2
12.9 12.4
11.5 10.4
9.6 8.5
7.5 6.7
6.0 5.2
4.4 3.7
3.0 2.7
2.3 2.0
1.8 1.7
1.1 0.9
1.0 0.6
0.9 0.9
1.4 1.4
1.4 1.4
1.4 1.5
1.5 1.5
1.1 1.2
1.6 2.1
2.5 2.9
3.9 4.4
4.9 5.4
5.8 6.2
6.6 5.4
4.0 6.6
6.3 2.4
3.3 4.5
5.8 7.2
8.3 9.3
10.2 10.8
11.2 12.1
12.8 13.1
13.0 12.6
11.9 11.0
9.7 8.4
7.7 6.6
5.9 5.2
4.6 4.0
3.4 3.0
2.8 2.4
2.2 2.1
1.3 1.0
1.1 1.4
1.0 1.0
1.3 1.7
1.7 1.6
1.6 1.6
1.7 1.7
1.7 1.2
1.3 1.5
2.1 2.3
2.6 2.9
4.0 4.4
4.7 5.0
5.3 5.5
5.8 5.8
5.5 5.3
2.6 3.6
4.9 6.3
7.6 8.5
9.4 10.3
11.3 11.7
12.3 12.7
12.7 12.4
12.1 11.5
10.4 8.9
7.3 6.2
5.8 5.1
4.6 4.1
3.6 3.1
3.1 2.8
2.6 2.4
2.2 1.0
1.1 1.9
2.0 1.3
1.0 1.9
1.8 1.8
1.8 1.7
1.7 1.8
1.8 1.9
2.0 1.3
1.4 2.5
2.6 2.3
2.5 3.5
3.8 4.1
4.3 4.5
4.4 4.6
4.6 4.5
4.4 2.7
3.7 5.2
6.7 7.8
8.7 9.5
10.4 11.3
11.8 12.1
12.5 12.2
11.7 11.2
10.5 9.7
8.4 6.9
5.0 3.9
4.6 4.1
3.8 3.5
2.9 3.0
2.6 2.4
2.2 0.9
1.0 2.0
1.9 1.9
2.1 1.0
1.7 1.8
1.8 1.9
1.9 1.9
1.9 1.9
1.9 1.9
2.2 1.3
2.3 2.3
2.5 1.8
2.2 3.4
3.3 3.4
3.6 3.6
3.9 4.0
3.9 3.7
2.7 3.8
5.3 6.8
7.9 8.6
9.3 10.3
11.1 11.6
11.7 2.2
2.5 2.9
3.1 3.3
6.2 7.7
6.3 5.2
4.4 2.7
3.8 3.6
3.4 3.1
3.2 3.0
2.9 2.8
2.7 2.6
2.6 2.5
2.1 2.1
2.1 2.1
2.1 2.1
2.2 2.2
2.2 2.2
2.2 2.2
2.3 2.1
2.1 2.5
2.6 2.7
2.8 2.1
3.1 3.2
3.3 3.4
3.3 3.3
3.5 3.4
3.2 2.7
3.8 5.3
6.8 7.9
8.5 9.2
10.1 10.8
11.1 11.1
11.1 10.8
10.2 9.6
9.0 8.2
7.1 5.9
4.7 4.0
2.7 2.9
3.5 3.0
3.4 3.1
3.1 3.0
2.9 2.9
2.8 2.1
2.2 2.2
2.2 2.2
2.2 2.2
2.2 2.2
2.2 2.2
2.2 2.2
2.2 2.2
2.1 2.3
2.4 2.5
2.6 2.7
2.1 2.8
2.8 2.9
2.9 2.8
2.7 3.0
2.9 2.8
2.7 3.7
5.1 6.5
7.6 8.2
8.9 9.6
10.3 10.4
10.4 10.4
10.0 9.3
8.7 8.1
7.4 6.4
5.3 4.6
4.1 3.7
2.6 2.6
2.0 3.5
3.1 3.1
3.1 3.0
2.1 2.1
2.1 2.1
2.1 1.9
1.8 2.3
2.4 2.1
2.5 2.5
2.5 2.5
2.5 2.4
2.3 2.8
2.7 2.5
2.6 3.5
4.7 6.0
7.1 7.8
8.4 9.0
9.5 9.5
9.5 9.5
9.1 8.6
8.0 7.4
6.6 5.7
4.9 4.2
3.6 3.2
2.9 3.0
2.4 1.9
2.7 2.6
2.5 2.4
2.4 3.3
4.3 5.5
6.5 7.3
7.9 8.3
8.5 8.4
8.4 8.5
8.3 7.9
7.3 6.7
5.9 5.1
4.4 3.9
3.4 3.4
3.3 3.3
3.3 1.8
1.9 2.0
2.4 2.2
2.2 2.9
3.8 4.8
5.8 6.6
7.3 7.5
7.7 7.5
7.4 7.5
7.5 7.1
6.6 6.0
5.3 4.6
4.0 3.7
3.4 3.3
3.3 3.2
1.9 2.6
3.3 4.1
5.0 5.8
6.4 6.7
6.8 6.7
6.6 6.6
6.5 6.3
5.9 5.3
4.7 4.2
3.7 3.4
3.2 3.1
2.5 2.0
1.6 2.2
2.8 3.5
4.2 4.9
5.4 5.7
5.7 5.7
5.6 5.6
5.5 5.4
5.1 4.6
4.1 3.7
3.3 3.1
2.5 2.2
2.1 1.9
1.3 1.8
2.3 2.9
3.4 3.9
4.3 4.6
4.6 4.5
4.5 4.5
4.5 4.4
4.2 3.9
3.5 3.1
2.7 2.4
2.1 2.1
1.9 1.8
1.0 1.4
1.8 2.3
2.7 3.1
3.4 3.5
3.5 3.5
3.4 3.4
3.5 3.4
3.3 3.1
2.8 2.5
2.3 2.0
1.9 1.9
1.8 1.7
0.8 1.1
1.4 1.8
2.0 2.3
2.5 2.6
2.6 2.5
2.5 2.5
2.5 2.5
2.4 2.3
2.2 2.0
1.8 1.8
1.7 1.7
1.6 1.5
0.6 0.8
1.0 1.3
1.5 1.7
1.8 1.8
1.8 1.8
1.7 1.7
1.7 1.8
1.8 1.7
1.7 1.6
1.5 1.5
0.6 1.2
1.2 1.3
0.5 0.6
0.7 0.9
1.0 1.2
1.2 1.2
1.2 1.1
1.1 1.1
1.1 1.2
1.2 1.2
1.2 1.3
1.2 0.7
1.2 1.2
1.1 1.1
0.3 0.4
0.5 0.6
0.7 0.8
0.8 0.8
0.7 0.7
0.7 0.7
0.8 0.8
0.8 0.8
0.9 0.8
0.7 0.6
1.0 1.1
1.1 1.0
0.2 0.3
0.4 0.4
0.5 0.5
0.5 0.5
0.4 0.4
0.4 0.4
0.5 0.6
0.6 0.6
0.5 0.4
0.6 0.9
0.9 1.0
1.0 1.0
0.2 0.2
0.3 0.3
0.3 0.3
0.3 0.3
0.3 0.3
0.3 0.3
0.4 0.4
0.5 0.4
0.3 0.3
0.3 0.9
0.9 1.0
1.0 1.0
0.1 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.3
0.3 0.4
0.4 0.4
0.5 0.2
0.4 0.9
0.9 1.0
1.0 1.0
0.1 0.1
0.1 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.3
0.3 0.3
0.4 0.4
0.5 0.7
0.4 0.4
0.9 1.1
1.1 1.1
0.1 0.1
0.1 0.1
0.1 0.2
0.2 0.2
0.2 0.2
0.2 0.3
0.3 0.3
0.4 0.5
0.6 0.8
0.9 0.3
0.2 1.2
1.2 1.2
0.1 0.1
0.1 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.3
0.3 0.4
0.5 0.6
0.7 0.9
1.0 1.1
0.4 1.3
1.4 1.4
0.1 0.1
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.2
0.2 0.3
0.4 0.5
0.6 0.7
0.8 1.0
1.1 1.2
1.4 1.4
1.5 1.5
0.2 0.2
0.3 0.3
0.4 0.4
0.4 0.3
0.3 0.3
0.3 0.4
0.5 0.6
0.7 0.9
1.0 1.1
1.2 1.4
1.4 1.6
1.6 1.6
0.2 0.3
0.4 0.6
0.6 0.7
0.6 0.6
0.6 0.6
0.6 0.7
0.8 0.9
1.0 1.1
1.2 1.3
1.4 1.5
1.6 1.7
1.7 1.7
0.4 0.5
0.7 0.9
1.0 1.1
1.1 1.1
1.1 1.1
1.1 1.2
1.2 1.3
1.3 1.4
1.4 1.5
1.6 1.7
1.7 1.8
1.8 1.7
0.6 0.8
1.0 1.3
1.5 1.7
1.8 1.9
1.9 1.9
1.9 1.9
1.9 1.9
1.9 1.8
1.8 1.7
1.8 1.8
1.8 1.9
1.9 1.8
0.8 1.0
1.4 1.8
2.2 2.5
2.8 2.8
2.8 2.8
2.8 2.8
2.8 2.7
2.6 2.4
2.2 2.1
2.0 2.0
2.0 2.0
2.0 1.9
1.0 1.4
1.9 2.4
3.0 3.5
3.8 3.9
3.9 3.9
3.9 3.9
3.8 3.7
3.4 3.2
2.9 2.6
2.4 2.2
2.1 2.1
2.0 1.9
1.2 1.7
2.4 3.1
3.8 4.5
5.0 5.2
5.2 5.1
5.1 5.1
5.0 4.7
4.4 4.0
3.6 3.2
2.9 2.7
2.6 2.5
2.4 1.9
1.5 2.1
2.9 3.7
4.7 5.5
6.1 6.4
6.4 6.3
6.3 6.3
6.1 5.8
5.3 4.7
4.2 3.7
3.3 3.0
2.7 2.6
2.6 2.3
1.8 2.5
3.3 4.4
5.4 6.4
7.1 7.5
7.5 7.3
7.3 7.3
7.1 6.7
6.1 5.5
4.8 4.2
3.6 3.2
2.8 1.8
2.0 2.5
2.0 2.8
3.8 4.9
6.1 7.1
7.8 8.3
8.2 8.0
8.0 8.1
7.8 7.3
6.7 6.0
5.2 4.4
3.7 2.3
1.7 2.5
2.3 2.2
2.2 3.1
4.2 5.5
6.7 7.6
8.3 8.8
9.0 8.8
8.7 8.7
8.4 7.9
7.3 6.6
5.6 4.3
3.3 2.5
2.5 2.3
2.1 2.0
2.4 3.3
4.6 6.0
7.2 8.0
8.6 9.2
9.7 9.7
9.6 9.5
8.9 8.3
7.4 6.6
5.7 4.6
3.4 3.1
2.5 2.1
1.8 1.7
2.5 3.5
4.8 6.3
7.5 8.2
8.8 9.4
10.1 10.2
10.0 9.8
9.2 8.3
7.5 6.7
5.9 4.7
3.9 3.0
2.3 1.9
1.6 1.4
2.5 3.5
5.0 6.5
7.7 8.2
8.8 9.5
10.1 10.3
9.9 0.1
0.1 0.1
0.1 0.1
0.1 5.1
3.8 2.8
2.3 1.8
1.4 1.2
2.5 3.5
4.9 6.4
7.6 8.1
8.7 9.4
9.9 10.1
9.9 9.6
9.1 8.2
7.4 6.6
6.0 4.9
3.7 2.7
2.1 1.6
1.3 1.1
2.5 3.4
4.7 6.1
7.2 7.9
8.4 9.0
9.6 9.6
9.5 9.3
8.8 7.9
7.2 6.5
5.7 4.6
3.5 2.6
2.0 1.5
1.2 1.0
2.4 3.3
4.4 5.7
6.8 7.5
8.1 8.5
8.9 8.8
8.7 8.7
8.2 7.6
6.9 6.1
5.3 4.3
3.3 2.5
1.9 1.4
1.1 0.9
2.2 3.0
4.0 5.1
6.2 7.0
7.6 8.0
8.1 7.9
7.8 7.8
7.6 7.1
6.5 5.7
4.8 3.9
3.0 2.3
1.7 1.3
0.9 0.7
2.0 2.7
3.5 4.5
5.5 6.3
6.9 7.3
7.3 7.1
7.0 7.0
6.9 6.5
5.9 5.2
4.3 3.5
2.7 2.1
1.5 1.1
0.8 0.7
1.7 2.3
3.1 3.8
4.7 5.5
6.1 6.4
6.5 6.3
6.2 6.2
1.9 2.0
2.0 1.8
1.8 1.8
1.7 1.8
1.8 1.7
1.7 1.7
1.6 1.7
1.6 1.5
1.6 1.6
1.4 1.5
1.5 1.3
1.4 1.3
1.2 1.2
1.2 1.1
1.1 1.1
1.0 1.0
1.0 1.0
1.0 1.0
1.0 1.0
1.0 1.0
1.0 1.1
1.1 1.1
1.2 1.2
1.2 1.3
1.3 1.3
1.4 1.4
1.4 1.5
1.5 1.5
1.6 1.6
1.6 1.6
1.7 1.7
1.7 1.7
1.7 1.7
1.7 1.7
1.6 1.7
1.7 1.6
2.3 2.1
2.5 2.5
2.4 2.4
2.3 2.4
2.2 2.5
2.5 2.4
2.4 2.4
2.5 2.3
2.1 1.5
2.2 2.2
2.1 2.3
2.2 2.1
1.9 1.6
1.7 1.7
1.7 2.1
2.0 1.9
1.7 1.8
1.6 1.5
1.5 1.6
1.6 1.6
1.5 2.1
2.2 2.4
2.5 2.6
2.2 2.3
2.4 2.5
2.6 2.1
2.1 2.1
2.2 1.5
1.9 1.6
1.7 1.7
1.6 1.5
1.5 2.0
3.0 3.0
3.0 3.0
2.9 2.9
2.9 2.8
2.7 2.7
3.0 3.0
3.0 3.0
2.9 2.9
2.8 2.8
2.7 2.7
2.8 2.9
2.9 3.0
3.0 2.9
3.0 3.0
3.0 2.7
2.9 2.7
0.9 1.2
1.6 1.8
2.0 2.1
2.1 2.0
2.6 2.1
1.7 1.2
0.9 0.7
0.4 0.3
0.2 0.1
0.1 0.1
1.3 1.9
2.4 2.9
3.2 3.4
3.3 3.2
3.2 2.7
2.1 1.6
1.1 0.8
0.5 0.3
0.2 0.1
0.1 0.1
0.1 1.8
2.6 3.5
4.2 4.7
4.9 4.7
4.5 4.3
4.0 3.6
3.0 2.3
1.6 1.1
0.7 0.4
6.8 8.6
6.8 6.5
6.2 5.8
5.2 4.6
3.9 3.2
2.5 1.9
1.3 0.9
0.6 0.3
0.2 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
2.3 3.4
4.5 5.5
6.1 6.2
6.2 5.9
5.5 5.2
4.7 3.9
3.0 2.0
1.3 0.8
0.5 0.5
0.7 0.9
1.1 1.1
1.3 7.1
7.4 7.6
9.0 7.6
7.4 7.0
6.6 6.0
5.3 4.5
3.7 2.9
2.1 1.5
1.0 0.6
0.4 0.3
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
2.6 3.9
5.2 6.3
7.0 7.0
6.9 6.6
6.2 5.8
5.2 4.4
3.3 2.3
1.4 0.9
0.5 0.7
0.9 1.1
1.3 1.2
1.4 1.8
2.5 3.4
4.4 5.5
6.5 7.2
7.8 8.2
8.5 1.0
8.4 8.2
7.8 7.3
6.7 5.9
5.0 4.0
3.1 2.3
1.6 1.0
0.7 0.5
0.3 0.2
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.2 0.1
0.2 0.3
0.3 0.2
0.2 2.7
4.0 5.4
6.4 7.1
6.8 6.7
6.4 6.0
5.7 5.1
4.3 3.2
2.2 1.4
0.8 0.5
0.9 1.2
1.4 1.6
1.3 1.5
1.9 2.6
3.6 4.8
5.9 7.0
7.8 8.4
8.9 9.4
0.9 9.4
9.1 8.6
7.9 7.2
6.2 5.2
4.2 3.2
2.3 1.6
1.0 0.7
0.5 0.4
0.4 0.3
0.4 0.4
0.4 0.4
0.4 0.3
0.4 0.4
0.4 0.4
0.4 0.4
0.4 0.3
0.3 0.2
2.7 3.8
4.9 5.8
3.9 0.9
1.4 1.6
1.8 1.4
1.5 1.9
2.7 3.7
4.9 6.2
7.2 8.0
8.8 9.5
9.9 9.5
9.9 9.7
9.2 8.3
7.3 6.4
5.3 4.2
3.2 2.3
1.6 1.0
0.7 0.5
0.5 0.5
0.5 0.5
0.6 0.8
0.9 0.9
0.9 0.9
0.9 0.7
0.6 0.6
0.6 0.5
0.5 0.4
0.3 2.5
3.5 4.3
4.0 3.7
1.3 1.9
1.8 1.9
1.5 1.5
1.9 2.7
3.8 5.0
6.3 7.3
8.1 8.9
9.7 10.1
10.1 9.9
9.2 8.3
7.4 6.4
5.4 4.2
3.1 2.3
1.6 1.0
0.7 0.5
0.5 0.6
0.7 0.8
1.0 1.2
1.3 1.4
1.5 1.5
1.4 1.2
1.0 0.9
0.8 0.7
0.6 0.4
0.3 2.5
3.1 3.8
4.1 3.8
1.5 2.2
2.0 2.0
1.6 1.6
1.9 2.8
3.9 5.2
6.4 6.6
5.5 4.2
3.2 2.3
1.6 1.0
0.7 0.5
0.5 0.5
0.7 0.9
1.2 1.5
1.8 1.9
2.0 1.9
1.7 1.4
1.0 0.9
0.8 0.6
0.5 0.4
0.3 2.4
3.3 4.1
4.4 4.1
1.5 2.1
2.0 2.0
1.6 1.6
2.0 2.9
4.0 5.3
6.6 6.9
5.7 4.2
3.2 2.3
1.6 1.0
0.6 0.4
0.4 0.4
0.5 0.6
0.9 1.2
1.5 1.9
2.1 1.9
1.5 1.1
0.8 0.6
0.7 0.6
0.5 0.4
0.4 2.5
3.5 4.3
4.6 4.3
1.1 1.7
1.8 2.0
1.6 1.7
2.0 2.9
4.0 5.3
6.6 7.1
5.8 4.1
3.1 2.3
1.5 1.0
0.6 0.3
0.2 0.2
0.2 0.3
0.5 0.7
1.1 1.5
1.6 1.4
1.0 0.7
0.4 0.3
0.7 0.7
0.6 0.5
0.4 2.5
3.4 4.3
4.6 4.3
6.3 7.2
3.9 3.0
2.2 1.5
1.0 0.6
0.3 0.2
0.2 0.2
2.4 3.3
4.0 4.3
4.0 2.3
3.1 3.8
4.1 3.8
2.3 3.2
3.9 4.1
3.9 2.4
3.4 4.2
4.5 4.2
2.5 3.5
4.4 4.6
4.4 2.5
3.5 4.3
4.6 4.3
2.4 3.3
4.0 4.3
4.0 2.3
3.2 3.8
4.1 3.8
2.3 3.2
3.9 4.2
3.9 2.4
3.4 4.2
4.5 4.2
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.2 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.2
3.9 4.3
4.3 3.6
2.8 2.5
3.4 4.2
4.5 4.2
4.6 4.5
3.9 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 2.3
3.2 3.8
4.1 3.8
4.1 4.0
3.5 2.7
2.3 3.2
3.9 4.2
3.9 4.3
4.3 3.7
2.8 2.5
3.4 4.2
4.5 4.2
4.6 4.5
3.9 2.9
2.5 3.5
4.4 4.6
4.4 4.6
4.5 3.9
2.9 2.5
3.5 4.3
4.6 4.3
4.4 4.3
3.7 2.8
2.4 3.3
4.0 4.3
4.0 4.1
4.0 3.5
2.7 7.6
8.5 9.3
10.1 10.4
10.5 10.3
10.1 9.5
8.7 7.9
8.7 9.4
9.9 10.1
10.1 10.1
10.0 9.5
9.1 7.7
8.6 9.2
9.4 9.5
9.4 9.4
9.4 9.3
9.3 7.3
8.2 8.7
8.8 8.9
8.8 8.8
9.0 9.0
9.2 8.2
6.6 7.6
8.0 8.2
8.3 8.3
8.3 8.5
8.5 8.8
7.9 6.9
5.8 6.8
7.1 7.4
7.5 7.6
7.6 7.8
7.8 8.0
7.3 6.5
5.1 6.0
6.0 6.2
6.2 6.2
6.3 6.6
6.7 7.0
6.3 5.5
4.5 5.3
5.0 5.0
4.7 4.7
4.9 5.3
5.5 5.9
5.1 4.4
4.1 4.7
4.1 3.9
3.5 3.4
3.7 4.1
4.5 5.0
4.2 3.4
2.5 3.2
3.7 4.1
3.4 3.2
2.6 2.5
2.8 3.3
3.7 4.1
3.4 2.6
2.1 2.7
3.1 3.5
2.8 2.5
2.0 1.8
2.1 2.6
3.0 3.5
2.9 2.1
1.5 2.0
2.5 3.1
2.4 2.0
1.5 1.2
1.5 2.1
2.7 3.3
2.7 2.0
2.1 2.7
2.1 1.7
1.1 0.9
1.3 1.9
2.5 3.2
2.6 2.1
1.9 2.4
1.9 1.4
1.0 0.8
1.0 1.7
2.3 3.1
2.8 2.3
1.8 2.4
1.8 1.3
0.9 0.7
0.9 1.6
2.1 3.0
2.7 2.2
1.9 2.5
1.9 1.4
0.9 0.6
0.9 1.6
2.1 2.8
2.3 1.8
2.2 2.7
2.0 1.5
0.9 0.7
0.9 1.5
2.0 2.6
2.0 1.4
1.5 2.1
2.5 2.8
2.0 1.5
0.8 0.7
0.9 1.3
1.9 2.4
1.8 1.6
2.1 2.5
2.8 2.0
1.5 0.8
0.7 0.9
1.3 1.8
2.3 1.7
1.0 1.3
1.8 2.2
2.7 2.0
1.5 0.9
0.6 0.8
1.3 1.9
2.4 1.8
1.1 1.9
2.5 1.9
1.4 0.9
0.6 0.9
1.5 2.0
2.6 2.0
1.4 1.8
2.4 1.8
1.3 0.9
0.6 0.9
1.5 2.0
2.7 2.3
1.8 1.8
2.3 1.8
1.3 0.9
0.7 0.8
1.5 2.0
2.8 2.5
2.1 1.9
2.4 1.9
1.4 0.8
0.6 0.9
1.5 2.0
2.8 2.4
2.0 2.0
2.6 2.0
1.5 0.9
0.7 0.9
1.5 2.0
2.6 2.1
1.6 2.4
2.8 2.0
1.5 0.9
0.6 0.9
1.4 1.9
2.5 1.9
1.2 1.6
2.2 2.5
2.8 2.0
1.5 0.8
0.7 0.9
1.3 1.8
2.3 1.7
1.1 1.4
1.9 2.4
2.7 2.0
1.5 0.9
0.6 0.9
1.3 1.8
2.3 1.8
1.1 2.0
2.6 2.0
1.5 0.9
0.6 0.8
1.4 1.9
2.5 1.9
1.3 5.4
4.2 3.1
2.3 1.6
1.0 0.7
0.5 0.5
0.6 5.5
4.2 3.2
2.3 1.6
1.0 0.7
0.5 0.5
0.5 5.7
4.2 3.2
2.3 1.6
1.0 0.6
0.4 0.4
0.4 5.8
4.1 3.1
2.3 1.5
1.0 0.6
0.3 0.2
0.2 3.9
3.0 2.2
1.5 1.0
0.6 0.3
0.2 0.2
8.2 7.9
Schedule
Symbol Label Quantity Manufacturer Catalog Number Description Lamp Number
Lamps
Filename
Lumens Per
Lamp
Light Loss
Factor
Wattage
6 Rayon Lighting
Group, Inc.
1 Rayon LightingT320LEDB-70WUNV-50-T5.ies9777 0.9 69.12 17 Performance iN
Lighting USA
071728 MIMIK 10 M TYPE III 10W 3000K
GR-94
304841 LUX M T75G
700mA
1 PIL_071728_MI
MIK_10_10_120
_277V_730_TYP
E_III_TEX_AL.ie
s
542 0.9 10
41 EATON - HALO
(FORMER
COOPER
LIGHTING)
SLD612930WH HALO 6 INCH SURFACE LED
DOWNLIGHT
LED 90CRI / 3000K CCT
ABSOLUTE PHOTOMETRY
IS BASED ON
CALIBRATION FACTORS
CREATED USING LAB
LUMEN STANDARDS IN
GONIOPHOTOMETER
WITH TEST DISTANCE
OF 28.75 FEET
1 Halo- NEWEST
SLD612930WH.i
es
925 0.9 14.8
12'-6"
5 3
°
0 1' 0
0 "
8 0.1
6'
S
E
5 3
°
0 1' 0
0 "
5 5.0
9'
S
E
BLDG A
BLDG C
BLDG B
(E) ONE STORY BUILDING
(COMMERCIAL)
C
R
E
S
PI D
RIV
E
VACANT /
UNDEVELOPED
AREA TO REMAIN
C
R
ES
PI D
R
VI E
PLANTER PLANTER PLANTER
PLANTER
PLANTER
PLANTER
PLANTERPLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
S
5 3°01'0
0 "
E
8 0.16' 5
0.0 0
NEW ENTRY DRIVE
EXISTING EXIT/ENTRY DRIVE 1/4"/FT. MIN SLOPE
BIKE RACKS BIKE RACKS
1/4"/FT.
MIN SLOPE
1/4"/FT. MINSLOPE
RAMP DN
S40°16'00"W
525.40'
HC
VAN
EV
13.3 2.6
2.6 2.6
2.7 2.7
3.1 3.1
3.1 3.1
3.1 3.1
3.1 3.1
3.1 3.1
3.1 3.1
3.1 10.2
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:14:53 AM
PHOTOMETRIC LIGHTING STUDY A-1.17 08/15/2022
1" = 10'-0" 1
Lighting plan revised
1.g
Packet Pg. 1132 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:14:53 AM
A-1.18
SITE PHOTOMETRIC LIGHTING FIXTURE
SPEC SHEETS
08/15/2022
1.g
Packet Pg. 1133 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 33,372.65
SF
VACANT /
UNDEVELOPED AREA
TO REMAIN
Site Area Legend
BLDG A
BLDG B
BLDG C
Grasscrete
HARDSCAPE
Landscape
TRASH
VACANT / UNDEVELOPED AREA TO
REMAIN
3,308.60
SF
BLDG A
7,046.30
SF
BLDG C
240.01
SF
TRASH
5,539.33
SF
BLDG B
15,409.29
SF
HARDSCAPE
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
189.89 SF
7 246.08 SF
8 262.39 SF
9 359.91 SF
10 312.52 SF
11 534.64 SF
12 308.11 SF
13 21.15 SF
14 1,085.02
SF
15 692.79 SF
16 UNIT AC-2
UNIT AC-1
2,279.29
SF
17 4.05 SF, Typ of 16
1.76 SF, Typ of 13
435.35 SF
40 12.00 SF
42 12.00 SF
43 12.00 SF
44 12.04 SF
45 13.65 SF
46 12.38 SF
47 12.30 SF
48 12.38 SF
49 12.38 SF
50 12.30 SF
51 12.00 SF
41 NOTE:
USABLE OPEN SPACE & LANDSCAPE
COVERAGE CALCULATIONS DO NOT
INCLUDE ANY LOT AREA WITHIN VACANT /
UNDEVELOPED AREA.
12.38 SF
52 12.14 SF
53 12.91 SF
54 16.12 SF
55 19.69 SF
56 18.78 SF
65 506.91 SF
69 404.46 SF
70 COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:14:57 AM
A-1.20
PROPOSED LANDSCAPE, OPEN SPACE
- SITE PLAN
08/15/2022
1" = 20'-0" 1
Site Plan
Landscape Coverage
Number Area
69 506.91 SF
70 404.46 SF
7 189.89 SF
8 246.08 SF
9 262.39 SF
10 359.91 SF
11 312.52 SF
12 534.64 SF
13 308.11 SF
14 21.15 SF
15 1,085.02 SF
16 692.79 SF
17 2,279.29 SF
18 4.05 SF
19 1.76 SF
20 4.05 SF
21 1.76 SF
22 4.05 SF
23 1.76 SF
24 4.05 SF
25 1.76 SF
26 4.05 SF
27 1.76 SF
28 4.01 SF
29 4.05 SF
30 1.76 SF
31 4.05 SF
32 1.76 SF
33 4.05 SF
34 1.76 SF
Area - Private Open Space
Unit Name Area
Open Space
UNIT A1 BALCONY 316.37 SF
UNIT A2 - BMR BALCONY 131.75 SF
UNIT A3 BALCONY 395.00 SF
UNIT B1 BALCONY 242.00 SF
UNIT B1 ROOF DECK 444.06 SF
UNIT B2 BALCONY 242.00 SF
UNIT B2 ROOF DECK 444.06 SF
UNIT B3 BALCONY 242.00 SF
UNIT B3 ROOF DECK 444.06 SF
UNIT B4 BALCONY 242.00 SF
UNIT B4 ROOF DECK 444.06 SF
UNIT B5 BALCONY 242.00 SF
UNIT B5 ROOF DECK 444.06 SF
UNIT B6 BALCONY 242.00 SF
UNIT B6 ROOF DECK 444.06 SF
UNIT B7 BALCONY 368.67 SF
UNIT B7 ROOF DECK 442.71 SF
UNIT C1 BALCONY 242.00 SF
UNIT C1 ROOF DECK 249.10 SF
UNIT C2 - BMR BALCONY 242.00 SF
UNIT C2 - BMR ROOF DECK 249.10 SF
UNIT C3 - BMR BALCONY 242.00 SF
UNIT C3 - BMR ROOF DECK 249.10 SF
UNIT C4 BALCONY 242.00 SF
UNIT C4 ROOF DECK 249.10 SF
UNIT C5 BALCONY 242.00 SF
UNIT C5 ROOF DECK 249.10 SF
Usable open space includes the private open space for
each unit, plus the landscaped area that meet the
requirement of a 10' x 4' minimum dimension.
REFER TO SHEETS A-1.22 THRU A-1.24 FOR PRIVATE OPEN
SPACE DIAGRAMS
Required: 13,350 SF
Provided:
Private Open Space 10,333.75 (2,790 req'd)
Landscape Open Space: 5,602.63
Total Usable Open Space: 15,936.38 SF
Minimum landscaped area: ten (10%) percent "Landscaping" shall mean plant and inorganic materials installed on the site to produce a pleasant aesthetic effect and to complement the structures constructed upon the site.
Landscaping Required: 10% of lot area, = 7,298 sf.
Usable open space. The minimum required usable open space, exclusive of all structures, shall contain an area having a slope of not more than ten (10%) percent and a minimum area per unit as follows: (1) Townhouses: 750 square feet per unit; and (2) All other forms of clustered housing: 450 square feet per unit.
Usable Open Space Required: (750 x 16) + (450 x 3) = 13,350 Square Feet Private open space. Each unit within the project shall have an appurtenant private patio, deck, balcony, atrium, or solarium with a minimum area of 150 square feet, except that a studio or one-bedroom unit shall be allowed to have a minimum area of 130 square feet. Such space shall be designed for the sole enjoyment of the unit owner, shall have at least one duplex weatherproofed electrical convenience outlet and shall have a shape and size which would allow for optimal usable space. Such space shall be at the same level as, and immediately accessible from, a room within the unit. 16 townhomes x 150 + 3 flats x 130 = 2,790
"Usable open space" shall mean common or private outdoor living, recreation, domestic use, or landscaping. Such area may be on the ground or on a roof, porch, deck, court, or balcony. Off-street parking areas or driveway and/or exit corridors shall not be included as usable open space. Any separate area to qualify under this definition shall be a minimum of four (4′) feet by ten (10′) feet. Usable open space shall not have a slope of more than ten (10%) percent.
Article 11 C-2 Development Requirements:
Article 24 Clustered Housing Requirements:
Landscape Open Space
Number Area
7 189.89 SF
8 246.08 SF
9 262.39 SF
11 312.52 SF
12 534.64 SF
15 1,085.02 SF
16 692.79 SF
17 2,279.29 SF
Total
Landscape
5,602.63 SF
Landscape Open Space areas are
Landscape areas that meet the
requirement to be counted as
common open space, and are
sumarizes separately here. They are
also included in the Total Landscape
Coveraage calculations to the right.
Article 2 Definitions:
Usable Open Space
The Landscaped area calculation
includes the planed areas of the
developed site but does not include
the vacant undeveloped area of the
natural state to the rear of the project.
Landscape Area:
Required, 10% 7,298.30
Provided: 7,953.59
equals 10% of total lot area, or
22% of developed lot area.
Vacant Undeveloped
Area 33,372.65
Combined, the Landscape coverage
plus the Vacant Undeveloped
Area equals 41,326.24 sf, or 56.6% of
the total lot area.
Landscape Coverage
Landscape Coverage
Number Area
35 4.05 SF
36 1.76 SF
37 4.05 SF
38 1.76 SF
39 4.05 SF
40 435.35 SF
41 12.00 SF
42 12.00 SF
43 12.00 SF
44 12.00 SF
45 12.04 SF
46 13.65 SF
47 12.38 SF
48 12.30 SF
49 12.38 SF
50 12.38 SF
51 12.30 SF
52 12.38 SF
53 12.14 SF
54 12.91 SF
55 16.12 SF
56 19.69 SF
58 4.01 SF
59 1.76 SF
60 4.05 SF
61 1.76 SF
62 4.05 SF
63 1.76 SF
64 4.05 SF
65 18.78 SF
Total
Landscape
7,953.59 SF
Area - Private Open Space
Unit Name Area
UNIT C6 BALCONY 242.00 SF
UNIT C6 ROOF DECK 249.10 SF
UNIT C7 BALCONY 242.00 SF
UNIT C7 ROOF DECK 249.10 SF
UNIT C8 BALCONY 242.00 SF
UNIT C8 ROOF DECK 249.10 SF
UNIT C9 BALCONY 385.00 SF
UNIT C9 ROOF DECK 249.10 SF
10,333.75 SF
1.g
Packet Pg. 1134 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 1 2 3 4 5 6 7 8
C
B
A
D
0 E
A
3 2
C
B
4 1
F
D
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.90
SF
TANDEM GARAGE
655.58
SF
TANDEM GARAGE
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
240.29
SF
TRASH
2,123.65
SF
UNIT AC-1
144.00
SF
COMMON AREA
UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
UNIT C1
UNIT C3 UNIT C2
UNIT C6 UNIT C5 UNIT C4 BMR UNIT
789.63
SF
UNIT AC-2
Building Area Legend
1ST FL. ENTRY
COMMON AREA
TANDEM GARAGE
TRASH
UNIT AC-1
UNIT AC-2
UNIT AC-3
251.80
SF
UNIT AC-3
98.10 SF
1ST FL. ENTRY
98.10 SF
1ST FL. ENTRY
655.90
SF
TANDEM GARAGE
37' - 2 3/4"5' - 9 1/4" 2' - 0"
11' - 6" 5' - 6" 11' - 6" 5' - 10"
43' - 0"
11' - 0" 21' - 0"
655.90
SF
TANDEM GARAGE
919.23
SF
TANDEM GARAGE
98.10 SF
1ST FL. ENTRY
17' - 0"
17' - 0" 17' - 0"
919.90
SF
TANDEM GARAGE
98.10 SF
1ST FL. ENTRY
UNIT C9 UNIT C8 UNIT C7
UNIT B7
BMR UNIT
11' - 6"
11' - 0"
24' - 0" 21' - 0"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:00 AM
A-1.21
PROPOSED AREA BLOCK DIAGRAM 1ST
FLOOR
08/15/2022
1/8" = 1'-0" 1
1ST Floor SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
REFER TO SHEET A1-23 FOR A
COMPREHENSIVE LIST OF AREA
BY BUILDING AND BY UNIT TYPE
1.g
Packet Pg. 1135 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) W
WH
WH
WH
W
W
1 2 3 4 5 6 7 8
C
B
A
D
0 731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR 731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1
BMR UNIT
72.00 SF
BALCONY
98.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY 287.00
SF
BALCONY
98.00 SF
BALCONY
1,019.00
SF
2ND FLOOR
270.67
SF
BALCONY
UNIT B7
995.00
SF
2ND FLOOR 731.00
SF
2ND FLOOR
731.00
SF
2ND FLOOR
98.00 SF
BALCONY
98.00 SF
BALCONY
98.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
UNIT C9 UNIT C8 UNIT C7
BMR UNIT
7' - 6 225/256"22' - 4" 19' - 0"
6' - 0" 11' - 0"
31' - 6"
7' - 0"
14' - 0"
6' - 0"
12' - 0"
43' - 0"
17' - 0"
31' - 6"
22' - 4"7' - 8"19' - 0"
6' - 0"
17' - 0"
5' - 0"
12' - 0" 17' - 0"
E
A
3 2
C
B
4 1
F
D
1,311.91
SF
UNIT A1
924.62
SF
UNIT A2 - BMR UNIT
1,311.52
SF
UNIT A3
Building Area Legend
BALCONY
PUBLIC BALCONY
UNIT A1
UNIT A2 - BMR UNIT
UNIT A3
25' - 6"
197.50
SF
BALCONY
197.50
SF
BALCONY
118.87
SF
BALCONY
197.50
SF
BALCONY
131.75
SF
BALCONY
328.58
SF
PUBLIC BALCONY
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:06 AM
A-1.22
PROPOSED AREA BLOCK DIAGRAM
2ND FLOOR
08/15/2022
1/8" = 1'-0" 1
2ND Floor
1/8" = 1'-0"
2 2ND Floor Flats
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
REFER TO SHEETS A-1.20 FOR
SUMMARY OF PRIVATE OPEN
SPACE
REFER TO SHEET A1-23 FOR A
COMPREHENSIVE LIST OF AREA
BY BUILDING AND BY UNIT TYPE
1.g
Packet Pg. 1136 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 0 1 2 3 4 5 6 7
1,134.00
SF
3RD FLOOR 692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
692.38
SF
3RD FLOOR
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
UNIT C1
UNIT C3 UNIT C2
UNIT C6 UNIT C5 UNIT C4 BMR UNIT
Building Area Legend
3RD FLOOR
BALCONY
Balcony - non O.S.
14' - 0"
3' - 0" 43' - 0" 6' - 0"
12' - 0"
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
17' - 0"
40.50 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
22' - 11 67/256"
(Open Space)
692.38
SF
3RD FLOOR
731.00
SF
3RD FLOOR
731.00
SF
3RD FLOOR
72.00 SF
BALCONY
72.00 SF
BALCONY
72.00 SF
BALCONY
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
42.00 SF
Balcony - non O.S.
UNIT C9 UNIT C8 UNIT C7
1,095.38
SF
3RD FLOOR
42.00 SF
Balcony - non O.S.
UNIT B7
BMR UNIT
33' - 9 5/8"
24' - 0"19' - 0"
19' - 0"24' - 0"
16' - 9 1/2"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:12 AM
A-1.23
PROPOSED AREA BLOCK DIAGRAM
3RD FLOOR
08/15/2022
1/8" = 1'-0" 1
3RD Floor
Area - Bldg B Townhomes, Typ.
Name Area
Townhome
1ST FL. ENTRY 98.10 SF
2ND FLOOR 731.00 SF
3RD FLOOR 692.38 SF
1,521.48 SF
Open Space
BALCONY 72.00 SF
BALCONY 98.00 SF
BALCONY 72.00 SF
ROOF DECK 444.06 SF
686.06 SF
Not Open Space
Balcony - non O.S. 42.00 SF
42.00 SF
Garage
TANDEM GARAGE 655.58 SF
655.58 SF
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
Area - Mixed Use Commercial
Name Area
UNIT AC-1 2,123.65 SF
UNIT AC-2 789.63 SF
UNIT AC-3 251.80 SF
3,165.08 SF
Area - Townhome C9
Name Area
Townhome
1ST FL. ENTRY 98.10 SF
2ND FLOOR 995.00 SF
3RD FLOOR 1,134.00 SF
2,227.10 SF
Open Space
BALCONY Not Placed
BALCONY 98.00 SF
BALCONY 287.00 SF
ROOF DECK 249.10 SF
634.10 SF
Not Open Space
Balcony - non O.S. 40.50 SF
40.50 SF
Garage
TANDEM GARAGE 919.23 SF
919.23 SF
Area - Mixed Use Residential
Name Area
UNIT AC
COMMON AREA 144.00 SF
UNIT A3
UNIT A3 1,311.52 SF
BALCONY 395.00 SF
UNIT A2 - BMR
UNIT A2 - BMR UNIT 924.62 SF
BALCONY 131.75 SF
UNIT A1
UNIT A1 1,311.91 SF
BALCONY 316.37 SF
UNIT A
PUBLIC BALCONY 328.58 SF
4,863.75 SF
Area - Summary per Unit
Unit Area Name Level
UNIT - Comm 2,123.65 SF UNIT AC-1 1ST Floor
UNIT - Comm 789.63 SF UNIT AC-2 1ST Floor
UNIT - Comm 251.80 SF UNIT AC-3 1ST Floor
3,165.08 SF
UNIT A1 1,311.91 SF UNIT A1 2ND Floor
1,311.91 SF
UNIT A2 - BMR 924.62 SF UNIT A2 - BMR UNIT 2ND Floor
924.62 SF
UNIT A3 1,311.52 SF UNIT A3 2ND Floor
1,311.52 SF
UNIT AC 144.00 SF COMMON AREA 1ST Floor
144.00 SF
UNIT B1 655.58 SF TANDEM GARAGE 1ST Floor
UNIT B1 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B1 731.00 SF 2ND FLOOR 2ND Floor
UNIT B1 692.38 SF 3RD FLOOR 3RD Floor
2,177.06 SF
UNIT B2 655.90 SF TANDEM GARAGE 1ST Floor
UNIT B2 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B2 731.00 SF 2ND FLOOR 2ND Floor
UNIT B2 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT B3 655.90 SF TANDEM GARAGE 1ST Floor
UNIT B3 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B3 731.00 SF 2ND FLOOR 2ND Floor
UNIT B3 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT B4 655.90 SF TANDEM GARAGE 1ST Floor
UNIT B4 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B4 731.00 SF 2ND FLOOR 2ND Floor
UNIT B4 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT B5 655.90 SF TANDEM GARAGE 1ST Floor
UNIT B5 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B5 731.00 SF 2ND FLOOR 2ND Floor
UNIT B5 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT B6 655.90 SF TANDEM GARAGE 1ST Floor
UNIT B6 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B6 731.00 SF 2ND FLOOR 2ND Floor
UNIT B6 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT B7 919.90 SF TANDEM GARAGE 1ST Floor
UNIT B7 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT B7 1,019.00 SF 2ND FLOOR 2ND Floor
UNIT B7 1,095.38 SF 3RD FLOOR 3RD Floor
3,132.38 SF
UNIT C1 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C1 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C1 731.00 SF 2ND FLOOR 2ND Floor
UNIT C1 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT C2 - BMR 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C2 - BMR 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C2 - BMR 731.00 SF 2ND FLOOR 2ND Floor
UNIT C2 - BMR 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT C3 - BMR 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C3 - BMR 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C3 - BMR 731.00 SF 2ND FLOOR 2ND Floor
UNIT C3 - BMR 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT C4 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C4 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C4 731.00 SF 2ND FLOOR 2ND Floor
UNIT C4 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT C5 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C5 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C5 731.00 SF 2ND FLOOR 2ND Floor
UNIT C5 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT C6 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C6 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C6 731.00 SF 2ND FLOOR 2ND Floor
UNIT C6 692.38 SF 3RD FLOOR 3RD Floor
2,177.38 SF
UNIT C7 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C7 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C7 731.00 SF 2ND FLOOR 2ND Floor
UNIT C7 731.00 SF 3RD FLOOR 3RD Floor
2,216.00 SF
UNIT C8 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C8 655.90 SF TANDEM GARAGE 1ST Floor
UNIT C8 731.00 SF 2ND FLOOR 2ND Floor
UNIT C8 731.00 SF 3RD FLOOR 3RD Floor
2,216.00 SF
UNIT C9 1,134.00 SF 3RD FLOOR 3RD Floor
UNIT C9 919.23 SF TANDEM GARAGE 1ST Floor
UNIT C9 98.10 SF 1ST FL. ENTRY 1ST Floor
UNIT C9 995.00 SF 2ND FLOOR 2ND Floor
3,146.33 SF
Grand total 43,696.04 SF
Area - Summary per Building
Unit Name Area
Mixed Bldg A - Comm
UNIT - Comm UNIT AC-1 2,123.65 SF
UNIT - Comm UNIT AC-2 789.63 SF
UNIT - Comm UNIT AC-3 251.80 SF
3,165.08 SF
Mixed Bldg A - Res
UNIT A1 UNIT A1 1,311.91 SF
UNIT A2 - BMR UNIT A2 - BMR UNIT 924.62 SF
UNIT A3 UNIT A3 1,311.52 SF
UNIT AC COMMON AREA 144.00 SF
3,692.04 SF
Townhouse B
UNIT B1 TANDEM GARAGE 655.58 SF
UNIT B1 1ST FL. ENTRY 98.10 SF
UNIT B1 2ND FLOOR 731.00 SF
UNIT B1 3RD FLOOR 692.38 SF
UNIT B2 TANDEM GARAGE 655.90 SF
UNIT B2 1ST FL. ENTRY 98.10 SF
UNIT B2 2ND FLOOR 731.00 SF
UNIT B2 3RD FLOOR 692.38 SF
UNIT B3 TANDEM GARAGE 655.90 SF
UNIT B3 1ST FL. ENTRY 98.10 SF
UNIT B3 2ND FLOOR 731.00 SF
UNIT B3 3RD FLOOR 692.38 SF
UNIT B4 TANDEM GARAGE 655.90 SF
UNIT B4 1ST FL. ENTRY 98.10 SF
UNIT B4 2ND FLOOR 731.00 SF
UNIT B4 3RD FLOOR 692.38 SF
UNIT B5 TANDEM GARAGE 655.90 SF
UNIT B5 1ST FL. ENTRY 98.10 SF
UNIT B5 2ND FLOOR 731.00 SF
UNIT B5 3RD FLOOR 692.38 SF
UNIT B6 TANDEM GARAGE 655.90 SF
UNIT B6 1ST FL. ENTRY 98.10 SF
UNIT B6 2ND FLOOR 731.00 SF
UNIT B6 3RD FLOOR 692.38 SF
UNIT B7 TANDEM GARAGE 919.90 SF
UNIT B7 1ST FL. ENTRY 98.10 SF
UNIT B7 2ND FLOOR 1,019.00 SF
UNIT B7 3RD FLOOR 1,095.38 SF
16,196.33 SF
Townhouse C
UNIT C1 TANDEM GARAGE 655.90 SF
UNIT C1 1ST FL. ENTRY 98.10 SF
UNIT C1 2ND FLOOR 731.00 SF
UNIT C1 3RD FLOOR 692.38 SF
UNIT C2 - BMR TANDEM GARAGE 655.90 SF
UNIT C2 - BMR 1ST FL. ENTRY 98.10 SF
UNIT C2 - BMR 2ND FLOOR 731.00 SF
UNIT C2 - BMR 3RD FLOOR 692.38 SF
UNIT C3 - BMR TANDEM GARAGE 655.90 SF
UNIT C3 - BMR 1ST FL. ENTRY 98.10 SF
UNIT C3 - BMR 2ND FLOOR 731.00 SF
UNIT C3 - BMR 3RD FLOOR 692.38 SF
UNIT C4 TANDEM GARAGE 655.90 SF
UNIT C4 1ST FL. ENTRY 98.10 SF
UNIT C4 2ND FLOOR 731.00 SF
UNIT C4 3RD FLOOR 692.38 SF
UNIT C5 TANDEM GARAGE 655.90 SF
UNIT C5 1ST FL. ENTRY 98.10 SF
UNIT C5 2ND FLOOR 731.00 SF
UNIT C5 3RD FLOOR 692.38 SF
UNIT C6 TANDEM GARAGE 655.90 SF
UNIT C6 1ST FL. ENTRY 98.10 SF
UNIT C6 2ND FLOOR 731.00 SF
UNIT C6 3RD FLOOR 692.38 SF
UNIT C7 1ST FL. ENTRY 98.10 SF
UNIT C7 TANDEM GARAGE 655.90 SF
UNIT C7 2ND FLOOR 731.00 SF
UNIT C7 3RD FLOOR 731.00 SF
UNIT C8 1ST FL. ENTRY 98.10 SF
UNIT C8 TANDEM GARAGE 655.90 SF
UNIT C8 2ND FLOOR 731.00 SF
UNIT C8 3RD FLOOR 731.00 SF
UNIT C9 3RD FLOOR 1,134.00 SF
UNIT C9 TANDEM GARAGE 919.23 SF
UNIT C9 1ST FL. ENTRY 98.10 SF
UNIT C9 2ND FLOOR 995.00 SF
20,642.59 SF
Grand total 43,696.04 SF
Area - Bldg C Townhomes, Typ.
Name Area
Townhome
1ST FL. ENTRY 98.10 SF
2ND FLOOR 731.00 SF
3RD FLOOR 692.38 SF
1,521.48 SF
Open Space
BALCONY 98.00 SF
BALCONY 72.00 SF
BALCONY 72.00 SF
ROOF DECK 249.10 SF
491.10 SF
Not Open Space
Balcony - non O.S. 42.00 SF
42.00 SF
Garage
TANDEM GARAGE 655.90 SF
655.90 SF
REFER TO SHEETS A-1.20 FOR
SUMMARY OF PRIVATE OPEN
SPACE AND USABLE OPEN SPACE
Area - Townhome B7
Name Area
Townhome
1ST FL. ENTRY 98.10 SF
2ND FLOOR 1,019.00 SF
3RD FLOOR 1,095.38 SF
2,212.48 SF
Open Space
BALCONY Not Placed
BALCONY 98.00 SF
BALCONY 270.67 SF
ROOF DECK 442.71 SF
811.38 SF
Not Open Space
Balcony - non O.S. 42.00 SF
42.00 SF
Garage
TANDEM GARAGE 919.90 SF
919.90 SF
1.g
Packet Pg. 1137 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 00 1 2 3 4 5 6 7 8
C
B
A
D
0 E
A
3 2
C
B
4 1
F
D
444.06
SF
ROOF DECK
444.06
SF
ROOF DECK
444.06
SF
ROOF DECK
444.06
SF
ROOF DECK
444.06
SF
ROOF DECK
444.06
SF
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1
BMR UNIT
Building Area Legend
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
249.10
SF
ROOF DECK
UNIT C9 UNIT C8 UNIT C7
442.71
SF
ROOF DECK
UNIT B7
BMR UNIT
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:14 AM
A-1.24
PROPOSED AREA BLOCK DIAGRAM
ROOF
08/15/2022
1/8" = 1'-0" 1
Roof Top
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
REFER TO SHEETS A-1.20 FOR
SUMMARY OF PRIVATE OPEN
SPACE
REFER TO SHEET A1-23 FOR A
COMPREHENSIVE LIST OF AREA
BY BUILDING AND BY UNIT TYPE
1.g
Packet Pg. 1138 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
SUNRISE
SOLSTICE : DEC .21 30°
SOLSTICE : JUN.21 76° EQUINOX : MAR.20,
SEP.22
54°
SUNSET
SOLSTICE : DEC .21 29.5°
SOLST CI E : UJ N 2. 1 75 5. °
EQUINOX : MAR.20,
SEP.22
54°
W
WH
WH
WH
DN
W
W
UP
E
A
2 3
C
B
1 4
F
1' - 2"
15' - 0"11' - 0"12' - 8"12' - 4"11' - 0"15' - 0" 1' - 2" 49' - 2" 5"
20' - 0" 15' - 0" 0"
D
BEDROOM
KITCHEN DINING LIVING
ELEV. BATH CLOS.
CLOS. PANTRY LNDRY.
BEDROOM
CLOSETBATH
3'-6" X 7'-2"
MIN.
300 CU FT PRIVATE
SOTRAGE. MIN SURF. AREA
= 25 SF. MIN DIMS. OF 3'-6"
& 6'-0"
BATH
OFFICELIVING DINING
300 CU FT PRIVATE
SOTRAGE. MIN SURF. AREA
= 25 SF. MIN DIMS. OF 3'-6"
& 6'-0"
CLOSETBATH BATH
ENTRY HALL KITCHEN
300 CU FT PRIVATE
SOTRAGE. MIN SURF.
AREA = 25 SF. MIN DIMS.
OF 3'-0" & 6'-0"
HALL
LNDRY.
CL.
KITCHEN
LIVING DINING OFFICE
BEDROOM
HALL
LNDRY.
ENTRY HALL
5' - 0" 27' - 2" 25' - 0" 27' - 2"
A2201
A2301
A2101
A2204
A2203
A2104
A2304
A2302
A2102 A2103
A2210
A2211
A2207
A2208
A2205 A2206
A2202
A2306
A2305
A2311
A2312 A2313
A2308
A2309 A2310
A2314
A2105
A2110
A2111
A2112
A2107
A2108 A2109
A2307
A2106
A2114
A2113
A2303
A208 A209
A206 A207
A205
A203
A201
A226
A210
A223 A222
A224
A221 A220
A204
A212
A217
A215
A219 A218
A225 A216
A211 A202 UNIT A1
UNIT A2
UNIT A3
A2209
E
A
2 3
C
B
1 4
F
All Gender
Restroom
103
5' - 6 1/2" 9' - 6"
1' - 2 1/4"
18' - 9 3/4" 14' - 7"
BUILDING A -
UNIT AC-2
101
C
R
ES
PI D
RIV
E
12' - 0"11' - 0"25' - 0"11' - 0"12' - 0"12' - 0"11' - 0"11' - 0"12' - 0" D
71' - 0"25' - 0"
8' - 8"
9' - 0 1/2"
8' - 7"
6' - 6 1/2"11' - 11"6' - 6 1/2"10' - 0"8' - 5"4' - 7"
4' - 6 1/2"
5 1/2"
14' - 7" 20' - 0" 14' - 7"
5 1/2"
50' - 1"
50' - 0"
48' - 0"23' - 0"
Elevator
105
LOBBY
104
Utility Closet
102
BUILDING A -
UNIT AC-1
100
UNIT DIVIDING LINE
8' - 8"71' - 10"8' - 8"
71 SF
Utility Room
258
5' - 8 1/4" 4' - 10 1/4" 6' - 11" 29' - 7 1/4"
1' - 0 1/2"
1' - 6 1/4"
A1103
A1101
A1108
A1105
A1102
A1106
A1107
A103
A107
A115
A114
A118 A120
A101
A109
A105
A102
A119 A121
A117
A106
A112
A110
A104
A108
A113
14' - 7"
A116
3' - 9" 3' - 9" 3' - 9"
1' - 6"
1' - 0"
6"6"
6"
1' - 0"
3' - 9" 3' - 9" 3' - 9"
A111
A1104
3/16" = 1'-0"
1 COMMERCIAL SECOND FLOOR PLAN
3/16" = 1'-0" 2
COM TOS Level 1
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
PHONE: 650-226-8770 WWW.EIDARCHITECTS.COM
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:39:27 AM
FLOOR PLANS - 1ST & 2ND FLOOR A3.1 06/15/2021
1.g
Packet Pg. 1139 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
SUNRISE
SOLSTICE : DEC .21 30°
SOLSTICE : JUN.21 76° EQUINOX : MAR.20,
SEP.22
54°
SUNSET
SOLSTICE : DEC .21 29.5°
SOLST CI E : UJ N 2. 1 75 5. °
EQUINOX : MAR.20,
SEP.22
54°
E
A
2 3
C
B
4 RIDGE
1 F
3" / 1'-0"
RIDGE
RIDGE
D
3" / 1'-0"
3" / 1'-0"
[No Slope]
3" / 1'-0"
3" / 1'-0"
[No Slope]
3" / 1'-0"
3" / 1'-0"
3" / 1'-0"
3" / 1'-0"
RIDGE
3" / 1'-0"
3" / 1'-0"
3" / 1'-0"
3" / 1'-0"
3" / 1'-0" 3" / 1'-0"
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
VALLEY
22' - 2 3/4"
9' - 7"
3' - 0" 16' - 2" 3' - 3"
SKYLIGHTS
SOLAR TUBE SKYLIGHTS, TYP.
A304 A305
A303 A306 A307
A302
A301
A308
A312
A313
A311
A309 A310
3/16" = 1'-0" 1
BUILDING A - ROOF PLAN
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:39:29 AM
FLOOR PLANS - ROOF PLAN A3.2 06/15/2021
1.g
Packet Pg. 1140 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
FRENCH DOOR
M19
DOOR/ WINDOW GLASS M15 ACID ETCHED, OBSCURE GLASS
KELLY MOORE, or EQUAL
Option 1 : Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized
treatment); factory powder coated
paint; fasteners are stainless steel or
welds).
Option 2: Steel sand blasted; Factory
spray applied bonding of 3/32"
aluminum (aluminized treatment);
factory powder coated paint with
colored rust texture (Cardinal BR47, or
equal) to achieve brown colored rust
patina); fasteners are stainless steel or
welds).
LOS GATOS IRON
WORKS, or EQUAL
EXTERIOR METAL,
GALVANIZED METAL ROUND
DOWNSPOUTS, ADDRESS
NUMBER, CHIMNEY CAP,
MECHANICAL SCREEN,
WINDOW CORNERS, METAL
AWNINGS
DOOR/ WINDOW HARDWARE
TPO ROOF
MATERIALS / APPLICATION CODE COLOR MANUFACTURER
EXTERIOR COLOR/ MATERIAL SCHEDULE
WALL
M13 DARK BRONZE
KMA89-5 BLACK OAK -
MATCH VERT. SIDING (M7)
CARDINAL, OR EQUAL
ROOF
M1
DARK BRONZE OR EQUAL
SLATE GREY GAF, OR EQUAL
M12
WINDOW FRAMES
M16
M4 WHITEST WHITE - KMW43, OR EQ.
WESTERN WINDOWS, OR EQ.
KELLY MOORE, OR EQ.
MISC.
DARK BRONZE FLEETWOOD, OR EQUAL
DOOR/ WINDOW / BALCONY GLASS loE 366M14 CARDINAL, OR EQUAL FASCIAS M3
M2
HORIZ. CEDAR SELECT SIDING, M6
CHANNEL GROOVE CEDAR OR EQUAL
METAL, STANDING SEAM STORM GREY CUSTOM BILT, OR EQUAL
CEDAR SELECT
CLASS A ROOFING
STUCCO - 7/8" SMOOTH TROWELED
EQ., PLASTER TEXTURE W/ MTL REVEALS
FRONT DOOR M17
RAILING - CABLE M18 KELLY MOORE, or EQUALKMA89-5 BLACK OAK BLACK OAK - KMA89-5 KELLY MOORE, OR EQ.
WESTERN RED CEDAR, OR
EQ.
BIG BAND, KM5828-2
DRIVE ISLE COLUMNS & TRASH
ENCLOSURES
SPLIT FACE CMU, 37G CHARCOAL
CONTROL JOINTS, TRIM BOARDS
AND REVEAL PANELS
KELLY MOORE, OR EQUAL
CENTRAL SUPPLY
COMPANY OR EQ.
COLUMNS & DIAGONAL BRACES LOS GATOS IRON WORKS
OR EQUAL
Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized treatment);
factory powder coated paint; fasteners
are stainless steel or welds).
PEARLY WHITE, KMW44-1
SCHLAGE, OR EQ.
WEEPING WILLOW - KM5155-5 KELLY MOORE, OR EQ.
M20
M21
M22
LIVING WALL FACADE -
WELDED WIRE AND BRACKETING
TRELLIS SYSTEM FOR SUPPORTING
LIVING PLANTS
M9 GREEN - PER MANUFACTURER
COLOR CHART
GREENSCREEN OR EQ.
VERT. CORRUGATED METAL SIDING &
BALCONY RAILINGS M7 KMA89-5 BLACK OAK METAL SALES or EQUAL * NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT
MATERIALS / APPLICATION COLORCODE MANUFACTURER
ILLUMINATED SIGNAGE COLOR/ MATERIAL SCHEDULE
SIGNAGE LENSES M25 ILLUMINATED FACED CHANNEL
LETTER DISPLAY WITH THROUGH FACE
ILLUMINATION - LED
MATERIAL THICKNESS GUIDE:
LEXAN/PLEXIGLAS FACES .125” MIN
COLOR:
BANJAMIN MOORE - SALSA 2009-20
OR EQUAL.
LEXAN, OR EQ.
SIGNAGE FRAMES & BACKING M26 CRAFT SIGN WORKS, OR
EQ.
STANDARD ALUMINUM CONSTRUCTION;
ALUMINUM LETTER BACKS .063” MIN.
ALUMINUM LETTER RETURNS .040” MIN
FACTORY SPRAY APPLIED BONDING OF
3/32" ALUMINUM (ALUMINIZED
TREATMENT); FACTORY POWDER
COATED PAINT.
COLOR:
MATTHEWS PAINT - 41335SP ANODIC
BLACK LRV 4.3, OR EQUAL.
SATIN ACRYLIC POLYURETHANE FINISH
SIGNAGE
TOS Level 1
E A
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
C B
MAX. HEIGHT
1 AR5.1
2 AR5.2 F
8' - 0"10' - 0"2' - 0" 8' - 0" 4' - 0"
1' - 0"
2' - 0"
3"
1'-0"
3"
1'-0"
3"
1'-0"
2' - 0"8' - 0"
6' - 0"
2' - 0"
D
16' - 1"
3' - 6"
4' - 0"8' - 0"
8' - 0"4' - 0"
M19 M6 M13 M6 M1 M7 M14 M6 M7 M19
M22
M7
12' - 0"
M7 M14 Signage Murphy's Shop
M25
M26
M22
COMMERCIAL UNIT AC-2 COMMERCIAL UNIT AC-1
M25M26 M25M26
Signage
A E
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
B C
Grade Level
MAX. HEIGHT
1 AR5.1
2 AR5.2
F
5' - 0"1' - 0"10' - 0"2' - 0"15' - 0"
3"
1'-0"
3"
1'-0"
3"
1'-0"
3"
1'-0"
8' - 0"
4' - 0"
4' - 0"
7' - 0"
7' - 0"
15' - 0"
D
M6 M1 M4
M9
M19
M19
M7 M14 M3
M22
M6
M22
M3
M8
M19
M14
M19
M13
Signage
M25M26
STANDING SEAM
ROOF
STUCCO - WHITE VERTICAL METAL
SIDING
M1 M3 BLACK OAK CEDAR SELECT
SIDING
TPO ROOF M4 M7 M6 M9 GREENSCREEN WALL
SLATE GRAY
M2 M14 OPAQUE GLASS SIGNAGE LENSES
SALSA
M25
NORTH ELEVATION - BUILDING A
SOUTH ELEVATION - BUILDING A
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:39:35 AM
A3.5
BUILDING A - NORTH & SOUTH
ELEVATIONS
06/15/2021
1.g
Packet Pg. 1141 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 2 3
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
4 MAX. HEIGHT
4 AR5.1
1 M7 M14 M3 M6 M6 M6 M14
M9 M22
M7 M19 M13 M15
M19
Signage
M25 M26
3 2
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
4 MAX. HEIGHT
4 AR5.1
1 2' - 0" 12' - 0" 8' - 0"
M1 M19 M7 M6 M1
M22 M9 M15
15' - 0" 2' - 0" 3' - 6"
M7 M14
Signage Signage
M6
M25 M26
M22
M19
STANDING SEAM
ROOF
STUCCO - WHITE VERTICAL METAL
SIDING
M1 M3 BLACK OAK CEDAR SELECT
SIDING
TPO ROOF M4 M6 M7 M9 GREENSCREEN WALL
SLATE GRAY
M2 M14 OPAQUE GLASS SIGNAGE LENSES
SALSA
M25
FRENCH DOOR
M19
DOOR/ WINDOW GLASS ACID ETCHED, OBSCURE GLASSM15
KELLY MOORE, or EQUAL
Option 1 : Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized
treatment); factory powder coated
paint; fasteners are stainless steel or
welds).
Option 2: Steel sand blasted; Factory
spray applied bonding of 3/32"
aluminum (aluminized treatment);
factory powder coated paint with
colored rust texture (Cardinal BR47, or
equal) to achieve brown colored rust
patina); fasteners are stainless steel or
welds).
LOS GATOS IRON
WORKS, or EQUAL
EXTERIOR METAL,
GALVANIZED METAL ROUND
DOWNSPOUTS, ADDRESS
NUMBER, CHIMNEY CAP,
MECHANICAL SCREEN,
WINDOW CORNERS, METAL
AWNINGS
DOOR/ WINDOW HARDWARE
TPO ROOF
MATERIALS / APPLICATION COLORCODE MANUFACTURER
EXTERIOR COLOR/ MATERIAL SCHEDULE
WALL
M13 DARK BRONZE
KMA89-5 BLACK OAK -
MATCH VERT. SIDING (M7)
CARDINAL, OR EQUAL
ROOF
M1
DARK BRONZE OR EQUAL
SLATE GREY GAF, OR EQUAL
M12
WINDOW FRAMES
M16
M4 WHITEST WHITE - KMW43, OR EQ.
WESTERN WINDOWS, OR EQ.
KELLY MOORE, OR EQ.
MISC.
DARK BRONZE FLEETWOOD, OR EQUAL
DOOR/ WINDOW / BALCONY GLASS loE 366M14 CARDINAL, OR EQUAL FASCIAS M3
M2
HORIZ. CEDAR SELECT SIDING, M6
CHANNEL GROOVE CEDAR OR EQUAL
METAL, STANDING SEAM STORM GREY CUSTOM BILT, OR EQUAL
CEDAR SELECT
CLASS A ROOFING
STUCCO - 7/8" SMOOTH TROWELED
EQ., PLASTER TEXTURE W/ MTL REVEALS
FRONT DOOR M17
RAILING - CABLE M18 KELLY MOORE, or EQUALKMA89-5 BLACK OAK BLACK OAK - KMA89-5 KELLY MOORE, OR EQ.
WESTERN RED CEDAR, OR
EQ.
BIG BAND, KM5828-2
DRIVE ISLE COLUMNS & TRASH
ENCLOSURES
SPLIT FACE CMU, 37G CHARCOAL
CONTROL JOINTS, TRIM BOARDS
AND REVEAL PANELS
KELLY MOORE, OR EQUAL
CENTRAL SUPPLY
COMPANY OR EQ.
COLUMNS & DIAGONAL BRACES LOS GATOS IRON WORKS
OR EQUAL
Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized treatment);
factory powder coated paint; fasteners
are stainless steel or welds).
PEARLY WHITE, KMW44-1
SCHLAGE, OR EQ.
WEEPING WILLOW - KM5155-5 KELLY MOORE, OR EQ.
M20
M21
M22
LIVING WALL FACADE -
WELDED WIRE AND BRACKETING
TRELLIS SYSTEM FOR SUPPORTING
LIVING PLANTS
M9 GREEN - PER MANUFACTURER
COLOR CHART
GREENSCREEN OR EQ.
VERT. CORRUGATED METAL SIDING &
BALCONY RAILINGS M7 KMA89-5 BLACK OAK METAL SALES or EQUAL * NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT
MATERIALS / APPLICATION COLORCODE MANUFACTURER
ILLUMINATED SIGNAGE COLOR/ MATERIAL SCHEDULE
M25SIGNAGE LENSES ILLUMINATED FACED CHANNEL
LETTER DISPLAY WITH THROUGH FACE
ILLUMINATION - LED
MATERIAL THICKNESS GUIDE:
LEXAN/PLEXIGLAS FACES .125” MIN
COLOR:
BANJAMIN MOORE - SALSA 2009-20
OR EQUAL.
LRV 17.34
LEXAN, OR EQ.
M26SIGNAGE FRAMES & BACKING CRAFT SIGN WORKS, OR
EQ.
STANDARD ALUMINUM CONSTRUCTION;
ALUMINUM LETTER BACKS .063” MIN.
ALUMINUM LETTER RETURNS .040” MIN
FACTORY SPRAY APPLIED BONDING OF
3/32" ALUMINUM (ALUMINIZED
TREATMENT); FACTORY POWDER
COATED PAINT.
COLOR:
MATTHEWS PAINT - 41335SP ANODIC
BLACK LRV 4.3, OR EQUAL.
SATIN ACRYLIC POLYURETHANE FINISH
SIGNAGE
EAST ELEVATION - BUILDING A
WEST ELEVATION - BUILDING A
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:39:43 AM
A3.6
BUILDING A - EAST & WEST
ELEVATION
06/15/2021
1.g
Packet Pg. 1142 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 2 A-3.8
2 3
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
4 MAX. HEIGHT
1 10' - 0"2' - 0"15' - 0"
1 A-3.8
3" / 1'-0"
UNIT A1
COMMERCIAL
KITCHEN
BUILDING A -
UNIT AC-1
CLOSETBATH BATH
2 2 A-3.8 3
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
4 MAX. HEIGHT
1 10' - 0"2' - 0"
1 A-3.8
UNIT A2
3" / 1'-0"
COMMERCIAL
CLOS.BATHELEV. BEDROOM
BUILDING A -
UNIT AC-1
LOBBY 16' - 0"
15' - 10 51/256"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:18 AM
BLDG A - COMMERCIAL - SECTIONS 1 A-3.7 08/15/2022
3/16" = 1'-0" 2
Commercial - Section 2
3/16" = 1'-0" 3
Commercial - Section 3
0' 2.67 ' 5.33 ' 10.67 ' 21.33 '
Graphic Scale: 3 /16 inch = 1 foot
1.g
Packet Pg. 1143 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 2 A-3.7
3 A-3.7
A E
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
B C
MAX. HEIGHT
D F
COMMERCIAL
6' - 3 1/2"
UNIT A1 UNIT A2 UNIT A3
2 A-3.7
3 A-3.7
A E
COM TOS Level 1
COM TOP Level 1
COM TOSF Level 2
COM TOP Level 2
B C
MAX. HEIGHT
D F
10' - 0"2' - 0"
COMMERCIAL
UNIT A1 UNIT A2 UNIT A3
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:23 AM
BLDG A - COMMERICAL - SECTIONS 2 A-3.8 08/15/2022
3/16" = 1'-0" 1
Commercial - Section 4
3/16" = 1'-0" 2
Commercial - Section 1
0' 2.67 ' 5.33 ' 10.67 ' 21.33 '
Graphic Scale: 3 /16 inch = 1 foot
1.g
Packet Pg. 1144 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
UP UP UP UP UP UP
UP
DN
UP UP
DN
UP UP UP
DN DN DN DN
1 2 3 4 5 6 7 8
C
A
0 A-4.4
1 A-4.3
A-4.3
2 A-4.4
1 2
2 A-4.6
2 A-4.6
1 A-4.6
1 A-4.6
1 A-4.5
1 A-4.5
2 A-4.5
2 A-4.5
3'-6" X 7'-2"
MIN.
200 CU FT PRIVATE SOTRAGE.
MIN SURF. AREA = 25 SF.
MIN DIMS. OF 3'-6" & 6'-0"
9'-0" X 19'-0"
MIN. CLEAR
FOR CAR
9'-0" X 19'-0"
MIN. CLEAR
FOR CAR
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
TRASH
UNIT B7
- 0"17' - 0"11' - 0" 9' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' 139' - 0"
43' - 0"43' - 0"2' - 0"
2 CAR GARAGE
ENTRYENTRYENTRY
AR GARAGE2 CAR GARAGE 2 CAR GARAGE2 CAR GARAGE2 CAR GARAGE2 CAR GARAGE2 C
ENTRYENTRYENTRYENTRY
GARAGE
24' - 0"19' - 0"2' - 0"
9'-0" X 19'-0"
MIN. CLEAR
FOR CAR
1 2 3 4 5 6 7 8
C
B
A
0 A-4.4
1 A-4.3
A-4.3
2 A-4.4
1 2
2 A-4.6
2 A-4.6
1 A-4.6
1 A-4.6
1 A-4.5
1 A-4.5
2 A-4.5
2 A-4.5
LIVING LIVING LIVING LIVING LIVING LIVING
DINING
KITCHEN
DINING
KITCHEN
DINING
KITCHEN
DINING
KITCHEN
DINING
KITCHEN
DINING
KITCHEN
PWDR PWDR PWDR PWDR PWDR PWDR
2" / 1'-0"
30' - 10"12' - 2"7' - 0"
43' - 0"
UNIT B7 UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1 12' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 9' - 0"
ACTIVITY LIVING
DINING
KITCHEN
131' - 0"
6' - 0"24' - 0"19' - 0"7' - 0"
43' - 0"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:26 AM
A-4.1
BLDG B - MULTIFAMILY WEST - 1ST &
2ND FLOOR PLANS
08/15/2022
1/8" = 1'-0" 1
1ST Floor Multi Fam West
0' 2 ' 4 ' 8 ' 16 '
Graphic Scale: 1 /4 inch = 1 foot
1/8" = 1'-0" 2
2ND Floor Multi Fam West
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
1.g
Packet Pg. 1145 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
UP UP UP UP UP UP
DN DN DN DN DN DN
DN DN DN DN DN DN
1 2 3 4 5 6 7 8
C
B
A
0 A-4.4
1 A-4.3
A-4.3
2 A-4.4
1 2
2 A-4.6
2 A-4.6
1 A-4.6
1 A-4.6
1 A-4.5
1 A-4.5
2 A-4.5
2 A-4.5
BATH 2 BED 2
LDRY
BATH 1
BED 1
BATH 1
LDRY
BED 2
BATH 2
BED 1
BATH 1
BED 1
LDRY
BED 2
BATH 2
BATH 1
BED 1
LDRY
BED 2
BATH 2
BATH 1
BED 1
LDRY
BED 2
BATH 2
BATH 1
BED 1
LDRY
BED 2 BATH 2
43' - 0"3' - 0"
9' - 6" 7' - 6"
2' - 6"12' - 0"5' - 0"12' - 0"5' - 0"12' - 0"
6' - 0"
UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
?
UNIT B7
BALCONY BALCONY BALCONY BALCONY BALCONY BALCONY
- 0"17' - 0"16' - 9 1/2" 9' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' BED2 BATH 2
M. BATH
M. CL.
M. BEDROOM
RETREAT
24' - 0"19' - 0"
1 2 3 4 5 6 7 8
C
B
A
0 ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK 128' - 0"
17' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 9' - 0" A-4.4
1 A-4.3
A-4.3
2 A-4.4
1 2
2 A-4.6
2 A-4.6
1 A-4.6
1 A-4.6
1 A-4.5
1 A-4.5
2 A-4.5
2 A-4.5
30' - 10"12' - 2"
43' - 0"
3" / 1'-0" 3" / 1'-0"
ROOF DECK
UNIT B7 UNIT B6 UNIT B5 UNIT B4 UNIT B3 UNIT B2 UNIT B1
APPROXIMATE
SOLAR PANEL
LOCATION, TYP.
7 3" / 1'-0"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:30 AM
A-4.2
BLDG B - MULTIFAMILY WEST - 3RD &
ROOF FLOOR PLANS
08/15/2022
1/8" = 1'-0" 1
3RD Floor Multi Fam West
0' 2 ' 4 ' 8 ' 16 '
Graphic Scale: 1 /4 inch = 1 foot
1/8" = 1'-0" 2
Roof Plan Multi Fam West
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
1.g
Packet Pg. 1146 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
8' - 6" 1' - 2 3/4" 10' - 0" 1' - 2 3/4" 9' - 0"
M3 M7 M1 M4 M19
M5 M10 M5 M22
M2 M4
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
M4 M7 M4
M6 M7 M3 M2
M22
M13 M14
M15
M4 M4
FRENCH DOOR
M19
DOOR/ WINDOW GLASS M15 ACID ETCHED, OBSCURE GLASS
* NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT KELLY MOORE, or EQUAL
Option 1 : Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized
treatment); factory powder coated
paint; fasteners are stainless steel or
welds).
Option 2: Steel sand blasted; Factory
spray applied bonding of 3/32"
aluminum (aluminized treatment);
factory powder coated paint with
colored rust texture (Cardinal BR47, or
equal) to achieve brown colored rust
patina); fasteners are stainless steel or
welds).
LOS GATOS IRON
WORKS, or EQ.
EXTERIOR METAL, FASCIAS,
COLUMNS, TRELLIS BEAMS,
GALVANIZED METAL ROUND
DOWNSPOUTS, ADDRESS
NUMBER, CHIMNEY CAP,
MECHANICAL SCREEN
DOOR/ WINDOW HARDWARE
M11
ASPHALT SHINGLE ROOF, CLASS A
MATERIALS / APPLICATION CODE COLOR MANUFACTURER
EXTERIOR COLOR/ MATERIAL SCHEDULE
WALL
M13 DARK BRONZE
KMA89-5 BLACK OAK
CARDINAL, OR EQ.
ROOF
M1
DARK BRONZE OR EQUAL
BLACK
GAF SLATELINE, ROYAL
SLATE, OR EQ.
GARAGE DOOR
M12
WINDOW FRAMES
M16
M4 WHITEST WHITE- KMW43, OR EQUAL
M8
VERT. MTL. SIDING PANELS, LOW BALCONY
WALL GUARDS, TRASH/RECYCLING
ENCLOSURE
SEMI GLOSS BLACK MTL. PANELS
WESTERN WINDOWS, OR EQ.
KELLY MOORE, OR EQ.
MISC.
DARK BRONZE FLEETWOOD, OR EQUAL
BLACK - METAL SECTIONAL, MATCH STUCCO CARRIAGE DOOR, OR EQ.
DOOR/ WINDOW GLASS loE 366M14 CARDINAL, OR EQ.
FASCIAS M3
M2
METAL SALES, OR EQ.
M5 BLACK OAK - KMA89-5
HORIZ. FIBER CEMENT BOARD SIDING, M6
"C" CHANNEL GROOVE - 8" EXPOSURE
METAL, STANDING SEAM, CLASS A STORM GREY CUSTOM BILT, OR EQ.
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
M10
CLASS A ROOFING
STUCCO - 7/8" SMOOTH TROWELED
FRONT DOOR M17
RAILING - CABLE M18 TBDSTAINLESS STEEL
BLACK OAK - KMA89-5 KELLY MOORE, OR EQ.
STUCCO - 7/8" SMOOTH TROWELED KELLY MOORE, OR EQ.
ALLURA USA, OR EQ.
BIG BAND, KM5828-2
TRASH ENCLOSURE DOORS
DRIVE ISLE COLUMNS & TRASH
ENCLOSURES
SPLIT FACE CMU, 37G CHARCOAL
CONTROL JOINTS, TRIM BOARDS
AND REVEAL PANELS
KELLY MOORE, OR EQUAL
CORRUGATED METAL, BIG BAND KM5828-2
CENTRAL SUPPLY
COMPANY OR EQ.
PORCH AND ENTRY COLUMNS LOS GATOS IRON WORKS,
OR EQUAL
Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized treatment);
factory powder coated paint; fasteners
are stainless steel or welds).
PEARLY WHITE, KMW44-1
KELLY MOORE, OR EQ.
SCHLAGE, OR EQ.
MAHOGANY - NATURAL WOOD TBD
M20
M21
M22
LIVING WALL FACADE -
WELDED WIRE AND BRACKETING
TRELLIS SYSTEM FOR SUPPORTING
LIVING PLANTS
M9 GREEN - PER MANUFACTURER
COLOR CHART
GREENSCREEN OR EQ.
VERTICAL FIBER CEMENT BOARD SIDING,
"C" CHANNEL GROOVE - 8" EXPOSURE
M7
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
ALLURA USA, OR EQ.
STANDING SEAM
ROOF
ASPHALT SHINGLES STUCCO - WHITE STUCCO - BLACK VERTICAL METAL SIDING
M1 M3, M19M2 BLACK OAK M4 M5 M6, M7 ASPHALT SHINGLES M8 M9 GREENSCREEN WALL SPLIT FACE CMUM21 COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:15:58 AM
A-4.3
BLDG B - MULTIFAMILY WEST -
ELEVATIONS NORTH & SOUTH
08/15/2022
1/8" = 1'-0" 1
Multifamily West - North Elevation
1/8" = 1'-0" 2
Multifamily West - South Elevation
0' 2.67 ' 5.33 ' 10.67 ' 21.33 '
Graphic Scale: 3 /16 inch = 1 foot
1.g
Packet Pg. 1147 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
0 1 2 3 4 5 6 7 8
M7 M19 M14 M4 M2 M6 M13 M14
M11 M17 M17 M8
M5
TYP.
M4 M5
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
8 7 6 5 4 3 2 1 0
M8
M4 M14 M12 M6 M3 M7 M14 M5
M17 M15 M22 TYP.
FRENCH DOOR
M19
DOOR/ WINDOW GLASS ACID ETCHED, OBSCURE GLASSM15
* NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT KELLY MOORE, or EQUAL
Option 1 : Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized
treatment); factory powder coated
paint; fasteners are stainless steel or
welds).
Option 2: Steel sand blasted; Factory
spray applied bonding of 3/32"
aluminum (aluminized treatment);
factory powder coated paint with
colored rust texture (Cardinal BR47, or
equal) to achieve brown colored rust
patina); fasteners are stainless steel or
welds).
LOS GATOS IRON
WORKS, or EQ.
EXTERIOR METAL, FASCIAS,
COLUMNS, TRELLIS BEAMS,
GALVANIZED METAL ROUND
DOWNSPOUTS, ADDRESS
NUMBER, CHIMNEY CAP,
MECHANICAL SCREEN
DOOR/ WINDOW HARDWARE
M11
ASPHALT SHINGLE ROOF, CLASS A
MATERIALS / APPLICATION COLORCODE MANUFACTURER
EXTERIOR COLOR/ MATERIAL SCHEDULE
WALL
M13 DARK BRONZE
KMA89-5 BLACK OAK
CARDINAL, OR EQ.
ROOF
M1
DARK BRONZE OR EQUAL
BLACK
GAF SLATELINE, ROYAL
SLATE, OR EQ.
GARAGE DOOR
M12
WINDOW FRAMES
M16
M4 WHITEST WHITE- KMW43, OR EQUAL
M8
VERT. MTL. SIDING PANELS, LOW BALCONY
WALL GUARDS, TRASH/RECYCLING
ENCLOSURE
SEMI GLOSS BLACK MTL. PANELS
WESTERN WINDOWS, OR EQ.
KELLY MOORE, OR EQ.
MISC.
DARK BRONZE FLEETWOOD, OR EQUAL
BLACK - METAL SECTIONAL, MATCH STUCCO CARRIAGE DOOR, OR EQ.
DOOR/ WINDOW GLASS loE 366M14 CARDINAL, OR EQ.
FASCIAS M3
M2
METAL SALES, OR EQ.
M5 BLACK OAK - KMA89-5
HORIZ. FIBER CEMENT BOARD SIDING, M6
"C" CHANNEL GROOVE - 8" EXPOSURE
METAL, STANDING SEAM, CLASS A STORM GREY CUSTOM BILT, OR EQ.
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
M10
CLASS A ROOFING
STUCCO - 7/8" SMOOTH TROWELED
FRONT DOOR M17
RAILING - CABLE M18 TBDSTAINLESS STEEL
BLACK OAK - KMA89-5 KELLY MOORE, OR EQ.
STUCCO - 7/8" SMOOTH TROWELED KELLY MOORE, OR EQ.
ALLURA USA, OR EQ.
BIG BAND, KM5828-2
TRASH ENCLOSURE DOORS
DRIVE ISLE COLUMNS & TRASH
ENCLOSURES
SPLIT FACE CMU, 37G CHARCOAL
CONTROL JOINTS, TRIM BOARDS
AND REVEAL PANELS
KELLY MOORE, OR EQUAL
CORRUGATED METAL, BIG BAND KM5828-2
CENTRAL SUPPLY
COMPANY OR EQ.
PORCH AND ENTRY COLUMNS LOS GATOS IRON WORKS,
OR EQUAL
Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized treatment);
factory powder coated paint; fasteners
are stainless steel or welds).
PEARLY WHITE, KMW44-1
KELLY MOORE, OR EQ.
SCHLAGE, OR EQ.
MAHOGANY - NATURAL WOOD TBD
M20
M21
M22
LIVING WALL FACADE -
WELDED WIRE AND BRACKETING
TRELLIS SYSTEM FOR SUPPORTING
LIVING PLANTS
M9 GREEN - PER MANUFACTURER
COLOR CHART
GREENSCREEN OR EQ.
VERTICAL FIBER CEMENT BOARD SIDING,
"C" CHANNEL GROOVE - 8" EXPOSURE
M7
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
ALLURA USA, OR EQ.
STANDING SEAM
ROOF
ASPHALT SHINGLES STUCCO - WHITE STUCCO - BLACK VERTICAL METAL SIDING
BLACK OAKM1 M3, M19M2 ASPHALT SHINGLESM6, M7M4 M5 M8 M9 GREENSCREEN WALL SPLIT FACE CMUM21 COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:16:27 AM
A-4.4
BLDG B - MULTIFAMILY WEST -
ELEVATIONS EAST & WEST
08/15/2022
1/8" = 1'-0" 1
Multifamily West - East Elevation
1/8" = 1'-0" 2
Multifamily West - West Elevation
0' 2.67 ' 5.33 ' 10.67 ' 21.33 '
Graphic Scale: 3 /16 inch = 1 foot
1.g
Packet Pg. 1148 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
DCBA
2 A-4.6
1 A-4.6
ROOF DECK
BATH 2
KITCHEN PWDR LIVING
8' - 6" 1' - 2 3/4" 10' - 0" 1' - 2 3/4" 9' - 0"
8' - 1 1/4"
6' - 10 7/8"
2 CAR GARAGE ENTRY 15' - 0"
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
DCBA
2 A-4.6
1 A-4.6
BED 2
LDRY
BATH 1 BED 1
DINING LIVINGKITCHEN
8' - 6" 1' - 2 3/4" 10' - 0" 1' - 2 3/4" 9' - 0"
2 CAR GARAGE ENTRY
1/
8"
/1'-
0"
15' - 6"
14' - 9"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:16:33 AM
A-4.5
BLDG B - MULTIFAMILY WEST - SECTIONS
1 08/15/2022
3/16" = 1'-0"
1 Multifamily West - Section 1
3/16" = 1'-0"
2 Multifamily West - Section 2
1.g
Packet Pg. 1149 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOSF Level 3
TOSF Level 2
MAX. HEIGHT
TOSF Level 4 Roof
8 7 6 5 1 4 3 2 1 0
A-4.5
2 A-4.5
LIVING
BED 1BED 1
LIVING LIVING LIVING LIVING LIVING
BED 1 BED 1 BED 1 BED 1
ECK ROOF DECKROOF DECKROOF DECKROOF DECKROOF DECKROOF D 9' - 0"1' - 2 3/4"10' - 0"
?
1' - 2 3/4"8' - 6"
UNIT B1 UNIT B2 UNIT B3 UNIT B4 UNIT B5 UNIT B6 UNIT B7 2" / 1'-0"
ENTRY ENTRY ENTRY ENTRY ENTRY
M. BATH M. BEDROOM
ACTIVITYLIVING
15' - 4 205/256"
TOS Level 1
TOSF Level 3
TOSF Level 2
TOSF Level 4 Roof
8 7 6 5 4 3 2 1 0
1 A-4.5
2 A-4.5
ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK
LDRY LDRY LDRYLDRYLDRYLDRY
DINING DINING DINING DINING DINING DINING
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
TRASH 2 CAR GARAGE ENTRY 2 CAR GARAGE ENTRY 2 CAR GARAGE ENTRY 2 CAR GARAGE ENTRY 2 CAR GARAGE ENTRY 2 CAR GARAGE
ACTIVITYDINING
RETREAT
TECH LAUNDRY
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:16:43 AM
A-4.6
BLDG B - MULTIFAMILY WEST - SECTIONS
2 08/15/2022
3/16" = 1'-0" 1
Multifamily West - Section 4
3/16" = 1'-0" 2
Multifamily West - Section 3
1.g
Packet Pg. 1150 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
UP UP UP UP UP UP
2 A-5.5
2 A-5.5
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
A-5.4
A-5.4
1 A-5.3
A-5.3 2
2 1
1 A-5.6
1 A-5.6
2 A-5.6
2 A-5.6
3 A-5.5
3 A-5.5
1 A-5.5
1 A-5.5
300 CU FT PRIVATE
SOTRAGE. MIN SURF.
AREA = 25 SF. MIN
DIMS. OF 3'-6" & 6'-0"
9'-0" X 19'-0"
MIN. CLEAR
FOR CAR
9'-0" X 19'-0"
MIN. CLEAR
FOR CAR
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1
UP UP UP UP UP UP
ADDRESS,
ORIENTATION SIGN
UNIT C9 UNIT C8 UNIT C7
- 0"17' - 0"17' - 0"11' - 0" 17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' 3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
3'-6" X 7'-2"
MIN.
2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE
2 CAR GARAGE
2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE
ENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRY
GARAGE
164' - 0"
2 A-5.5
2 A-5.5
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
A-5.4
A-5.4
1 A-5.3
A-5.3 2
2 1
1 A-5.6
1 A-5.6
2 A-5.6
2 A-5.6
3 A-5.5
3 A-5.5
1 A-5.5
1 A-5.5
UNIT C9 UNIT C8 UNIT C7 UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1 - 0"17' - 0"17' - 0"11' - 0" 17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' 164' - 0"
KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN
ING DININGDININGDININGDININGDININGDININGDININGDININGDIN
INGACTIVITY LIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIV COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:16:46 AM
A-5.1
BLDG C - MULTIFAMILY EAST - FIRST &
SECOND FLOOR PLAN
08/15/2022
1/8" = 1'-0" 1
1ST Floor Multi Fam East
0' 4 ' 8 ' 16 ' 32 '
Graphic Scale: 1 /8 inch = 1 foot
1/8" = 1'-0" 2
2ND Floor Multi Fam East
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
1.g
Packet Pg. 1151 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
DN DN DN DN DN DN
UP UP UP UP UP
UP
2 A-5.5
2 A-5.5
0 1 2 3 4 5 6 7 8
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
A-5.4
A-5.4
1 A-5.3
A-5.3 2
2 1
1 A-5.6
1 A-5.6
2 A-5.6
2 A-5.6
3 A-5.5
3 A-5.5
1 A-5.5
1 A-5.5
UNIT C9 UNIT C8 UNIT C7 UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1 M. BED M. BATH BED 1 BED 1 BED 1 BED 1
M. CL.
RETREAT
BATH 2 BED 2 BATH 2BED2 BED 2 BATH 2 BED 2 BATH 2 BED 2 BATH 2 BED 2 BATH 2 BATH 1 BATH 1 BATH 1 BATH 1 BATH 1
BED 1
LDRYLDRYLDRYLDRYLDRY
BED 2 BATH 2 BED 2 BATH 2 BED 2 BATH 2 LDRY LDRY LDRY
BATH 1 BATH 1 BATH 1
BED 1 BED 1 BED 1
0 1 2 3 4 5 6 7
E
F
G
H
8 9 10
A-5.4
A-5.4
1 A-5.3
A-5.3 2
2 1
1 A-5.6
1 A-5.6
2 A-5.6
2 A-5.6
3 A-5.5
3 A-5.5
ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK ROOF DECK
APPROXIMATE
SOLAR PANEL
LOCATION, TYP.
7 - 0"17' - 0"17' - 0"11' - 0" 17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' - 0"17' 2" / 1'-0" 2" / 1'-0" 2" / 1'-0" 2" / 1'-0"
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:16:50 AM
A-5.2
BLDG C - MULTIFAMILY EAST - THIRD
AND ROOF DECK FLOOR PLAN
08/15/2022
1/8" = 1'-0" 1
3RD Floor Multi Fam East
0' 2 ' 4 ' 8 ' 16 '
Graphic Scale: 1 /4 inch = 1 foot
1/8" = 1'-0" 2
Roof Plan Multi Fam East
SUNRISE
29° South East
7:20 12/21
31° North East
4:49 6/2
EA
1 ST
SUNSET
29° South West
19:31 6/21
31° North West
16:52 12/21
WEST
29.5°
75.5°
Magnetic North
1.g
Packet Pg. 1152 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
H G F E
M9 M5
M2 M3 M7 M4
M22
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
E F G H
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
M21
M22
M5
M4 M7 M2 M3 M4
FRENCH DOOR
M19
DOOR/ WINDOW GLASS ACID ETCHED, OBSCURE GLASSM15
* NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT KELLY MOORE, or EQUAL
Option 1 : Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized
treatment); factory powder coated
paint; fasteners are stainless steel or
welds).
Option 2: Steel sand blasted; Factory
spray applied bonding of 3/32"
aluminum (aluminized treatment);
factory powder coated paint with
colored rust texture (Cardinal BR47, or
equal) to achieve brown colored rust
patina); fasteners are stainless steel or
welds).
LOS GATOS IRON
WORKS, or EQ.
EXTERIOR METAL, FASCIAS,
COLUMNS, TRELLIS BEAMS,
GALVANIZED METAL ROUND
DOWNSPOUTS, ADDRESS
NUMBER, CHIMNEY CAP,
MECHANICAL SCREEN
DOOR/ WINDOW HARDWARE
M11
ASPHALT SHINGLE ROOF, CLASS A
MATERIALS / APPLICATION COLORCODE MANUFACTURER
EXTERIOR COLOR/ MATERIAL SCHEDULE
WALL
M13 DARK BRONZE
KMA89-5 BLACK OAK
CARDINAL, OR EQ.
ROOF
M1
DARK BRONZE OR EQUAL
BLACK
GAF SLATELINE, ROYAL
SLATE, OR EQ.
GARAGE DOOR
M12
WINDOW FRAMES
M16
M4 WHITEST WHITE- KMW43, OR EQUAL
M8
VERT. MTL. SIDING PANELS, LOW BALCONY
WALL GUARDS, TRASH/RECYCLING
ENCLOSURE
SEMI GLOSS BLACK MTL. PANELS
WESTERN WINDOWS, OR EQ.
KELLY MOORE, OR EQ.
MISC.
DARK BRONZE FLEETWOOD, OR EQUAL
BLACK - METAL SECTIONAL, MATCH STUCCO CARRIAGE DOOR, OR EQ.
DOOR/ WINDOW GLASS loE 366M14 CARDINAL, OR EQ.
FASCIAS M3
M2
METAL SALES, OR EQ.
M5 BLACK OAK - KMA89-5
HORIZ. FIBER CEMENT BOARD SIDING, M6
"C" CHANNEL GROOVE - 8" EXPOSURE
METAL, STANDING SEAM, CLASS A STORM GREY CUSTOM BILT, OR EQ.
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
M10
CLASS A ROOFING
STUCCO - 7/8" SMOOTH TROWELED
FRONT DOOR M17
RAILING - CABLE M18 TBDSTAINLESS STEEL
BLACK OAK - KMA89-5 KELLY MOORE, OR EQ.
STUCCO - 7/8" SMOOTH TROWELED KELLY MOORE, OR EQ.
ALLURA USA, OR EQ.
BIG BAND, KM5828-2
TRASH ENCLOSURE DOORS
DRIVE ISLE COLUMNS & TRASH
ENCLOSURES
SPLIT FACE CMU, 37G CHARCOAL
CONTROL JOINTS, TRIM BOARDS
AND REVEAL PANELS
KELLY MOORE, OR EQUAL
CORRUGATED METAL, BIG BAND KM5828-2
CENTRAL SUPPLY
COMPANY OR EQ.
PORCH AND ENTRY COLUMNS LOS GATOS IRON WORKS,
OR EQUAL
Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized treatment);
factory powder coated paint; fasteners
are stainless steel or welds).
PEARLY WHITE, KMW44-1
KELLY MOORE, OR EQ.
SCHLAGE, OR EQ.
MAHOGANY - NATURAL WOOD TBD
M20
M21
M22
LIVING WALL FACADE -
WELDED WIRE AND BRACKETING
TRELLIS SYSTEM FOR SUPPORTING
LIVING PLANTS
M9 GREEN - PER MANUFACTURER
COLOR CHART
GREENSCREEN OR EQ.
VERTICAL FIBER CEMENT BOARD SIDING,
"C" CHANNEL GROOVE - 8" EXPOSURE
M7
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
ALLURA USA, OR EQ.
STANDING SEAM
ROOF
ASPHALT SHINGLES STUCCO - WHITE STUCCO - BLACK VERTICAL METAL SIDING
BLACK OAKM1 M3, M19M2 ASPHALT SHINGLESM6, M7M4 M5 M8 M9 GREENSCREEN WALL SPLIT FACE CMUM21 COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:17:26 AM
A-5.3
BLDG C - MULTIFAMILY EAST -
ELEVATIONS NORTH & SOUTH
08/15/2022
1/8" = 1'-0" 1
Multifamily East - North Elevation
1/8" = 1'-0" 2
Multifamily East - South Elevation
0' 4 ' 8 ' 16 ' 32 '
Graphic Scale: 1 /8 inch = 1 foot
1.g
Packet Pg. 1153 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
0 1 2 3 4 5 6 7 8 9 10
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
M12 M22 TYP.
M4 M2 M5 M7
35' - 0"
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
10 9 8 7 6 5 4 3 2 1 0
M7
TYP.
FRENCH DOOR
M19
DOOR/ WINDOW GLASS ACID ETCHED, OBSCURE GLASSM15
* NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT KELLY MOORE, or EQUAL
Option 1 : Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized
treatment); factory powder coated
paint; fasteners are stainless steel or
welds).
Option 2: Steel sand blasted; Factory
spray applied bonding of 3/32"
aluminum (aluminized treatment);
factory powder coated paint with
colored rust texture (Cardinal BR47, or
equal) to achieve brown colored rust
patina); fasteners are stainless steel or
welds).
LOS GATOS IRON
WORKS, or EQ.
EXTERIOR METAL, FASCIAS,
COLUMNS, TRELLIS BEAMS,
GALVANIZED METAL ROUND
DOWNSPOUTS, ADDRESS
NUMBER, CHIMNEY CAP,
MECHANICAL SCREEN
DOOR/ WINDOW HARDWARE
M11
ASPHALT SHINGLE ROOF, CLASS A
MATERIALS / APPLICATION COLORCODE MANUFACTURER
EXTERIOR COLOR/ MATERIAL SCHEDULE
WALL
M13 DARK BRONZE
KMA89-5 BLACK OAK
CARDINAL, OR EQ.
ROOF
M1
DARK BRONZE OR EQUAL
BLACK
GAF SLATELINE, ROYAL
SLATE, OR EQ.
GARAGE DOOR
M12
WINDOW FRAMES
M16
M4 WHITEST WHITE- KMW43, OR EQUAL
M8
VERT. MTL. SIDING PANELS, LOW BALCONY
WALL GUARDS, TRASH/RECYCLING
ENCLOSURE
SEMI GLOSS BLACK MTL. PANELS
WESTERN WINDOWS, OR EQ.
KELLY MOORE, OR EQ.
MISC.
DARK BRONZE FLEETWOOD, OR EQUAL
BLACK - METAL SECTIONAL, MATCH STUCCO CARRIAGE DOOR, OR EQ.
DOOR/ WINDOW GLASS loE 366M14 CARDINAL, OR EQ.
FASCIAS M3
M2
METAL SALES, OR EQ.
M5 BLACK OAK - KMA89-5
HORIZ. FIBER CEMENT BOARD SIDING, M6
"C" CHANNEL GROOVE - 8" EXPOSURE
METAL, STANDING SEAM, CLASS A STORM GREY CUSTOM BILT, OR EQ.
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
M10
CLASS A ROOFING
STUCCO - 7/8" SMOOTH TROWELED
FRONT DOOR M17
RAILING - CABLE M18 TBDSTAINLESS STEEL
BLACK OAK - KMA89-5 KELLY MOORE, OR EQ.
STUCCO - 7/8" SMOOTH TROWELED KELLY MOORE, OR EQ.
ALLURA USA, OR EQ.
BIG BAND, KM5828-2
TRASH ENCLOSURE DOORS
DRIVE ISLE COLUMNS & TRASH
ENCLOSURES
SPLIT FACE CMU, 37G CHARCOAL
CONTROL JOINTS, TRIM BOARDS
AND REVEAL PANELS
KELLY MOORE, OR EQUAL
CORRUGATED METAL, BIG BAND KM5828-2
CENTRAL SUPPLY
COMPANY OR EQ.
PORCH AND ENTRY COLUMNS LOS GATOS IRON WORKS,
OR EQUAL
Steel sand blasted;
Factory spray applied bonding of
3/32" aluminum (aluminized treatment);
factory powder coated paint; fasteners
are stainless steel or welds).
PEARLY WHITE, KMW44-1
KELLY MOORE, OR EQ.
SCHLAGE, OR EQ.
MAHOGANY - NATURAL WOOD TBD
M20
M21
M22
LIVING WALL FACADE -
WELDED WIRE AND BRACKETING
TRELLIS SYSTEM FOR SUPPORTING
LIVING PLANTS
M9 GREEN - PER MANUFACTURER
COLOR CHART
GREENSCREEN OR EQ.
VERTICAL FIBER CEMENT BOARD SIDING,
"C" CHANNEL GROOVE - 8" EXPOSURE
M7
TRADITIONAL CEDAR TEXTURE
COLOR - CEDAR
ALLURA USA, OR EQ.
STANDING SEAM
ROOF
ASPHALT SHINGLES STUCCO - WHITE STUCCO - BLACK VERTICAL METAL SIDING
BLACK OAKM1 M3, M19M2 M4 M5 ASPHALT SHINGLESM6, M7 M8 M9 GREENSCREEN WALL SPLIT FACE CMUM21 COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:18:04 AM
A-5.4
BLDG C - MULTIFAMILY EAST -
ELEVATIONS EAST & WEST
08/15/2022
1/8" = 1'-0" 1
Multifamily East - East Elevation
1/8" = 1'-0" 2
Multifamily East - West Elevation
0' 4 ' 8 ' 16 ' 32 '
Graphic Scale: 1 /8 inch = 1 foot
1.g
Packet Pg. 1154 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
E F 1 G H
A-5.6
2 A-5.6
3 A-5.5
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
BED 2
LDRY
BATH 1 BED 1
LIVINGKITCHEN DINING
2 CAR GARAGE ENTRY
15' - 0"
14' - 9 1/8"
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
E F 1 G H
A-5.6
2 A-5.6
3 A-5.5
??
6' - 9 3/8"
6' - 10 1/2"
BATH 2
ROOF DECK
KITCHEN PWDR LIVING
2 CAR GARAGE ENTRY
2 A-5.5
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
TOSF Level 4 Roof
0 1 2 3 4 5 6 7 8 9 10
1 A-5.5
3' - 4 1/2"1' - 8"9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6" 35' - 0"
UNIT C9 UNIT C8 UNIT C7 UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE
DINING PWDR DINING PWDR DINING PWDR DINING PWDR
2 CAR GARAGE 2 CAR GARAGE
DINING PWDR DINING PWDR
2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE
DINING PWDR DINING PWDR DINING PWDR
BED 2BED 2BED 2BED 2
ROOF DECKROOF DECK
BED 2BED 2
ROOF DECK
BED 2
ROOF DECK
BED 2
ROOF DECK
BED2
ROOF DECK
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:18:13 AM
A-5.5
BLDG C - MULTIFAMILY EAST - SECTIONS
1 08/15/2022
3/16" = 1'-0" 1
Multifamily East - Section 1
3/16" = 1'-0"
2 Multifamily East - Section 2
3/16" = 1'-0" 3
Multifamily East - Section 3
1.g
Packet Pg. 1155 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 2 A-5.5
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
0 1 2 3 4 5 6 7 8 9 10
1 A-5.5
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
UNIT C9 UNIT C8 UNIT C7 UNIT C6 UNIT C5 UNIT C4 UNIT C3 UNIT C2 UNIT C1
LIVINGLIVINGACTIVITY
2 CAR GARAGEGARAGE
BATH 1 LDRYRETREAT
2 CAR GARAGEENTRY ENTRY 2 CAR GARAGE
LIVING
2 CAR GARAGEENTRY ENTRY
LIVING
LDRYBATH 1BATH 1 LDRY BATH 1 LDRY
LIVING
2 CAR GARAGE ENTRY
BATH 1 LDRY
LIVING
2 CAR GARAGE ENTRY 2 CAR GARAGE ENTRY 2 CAR GARAGE
LIVING LIVING
BATH 1 LDRY BATH 1 LDRY BATH 1 LDRY
LIVING
2 CAR GARAGE ENTRYENTRY
2 A-5.5
TOS Level 1
TOP Level 2
TOP Level 3
TOSF Level 3
TOSF Level 2
TOP Level 1
MAX. HEIGHT
0 1 2 3 4 5 6 7 8 9 10 1
A-5.5
9' - 0"1' - 2 3/4"10' - 0"1' - 2 3/4"8' - 6"
35' - 0"
M. BED M. BATH BED 1 BED 1 BED 1
ACTIVITY LIVING LIVING LIVING LIVING
GARAGE ENTRY ENTRY ENTRY ENTRY ENTRY
LIVING
BED 1 BED 1
LIVING
ENTRY
BED 1
LIVING
ENTRY
BED 1
LIVING
ENTRY
BED 1
LIVING
ENTRY
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:18:26 AM
A-5.6
BLDG C - MULTIFAMILY EAST - SECTIONS
2 08/15/2022
3/16" = 1'-0" 1
Multifamily East - Section 4
3/16" = 1'-0" 2
Multifamily East - Section 5
1.g
Packet Pg. 1156 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:18:27 AM
COLORS AND MATERIALS A-6.1 08/15/2022
13. HORIZONTAL ARTISAN LAP SIDING
CORNER INSET DARK WINDOWS
10. HORIZONTAL ARTISAN LAP SIDING
6. INSET WINDOWS
4. STANDING SEAM ROOF WITH SKYLIGHTS
12. I BEAM SUPPORT FRAMING
11. I BEAM SUPPORT FRAMING
9. GLASS, HORIZONTAL SIDING, BOARD FORMED CONC.
5. ENTRY DOOR,
BIG BLACK FRAMED WINDOWS
8. STEEL SUPPORT, CEDAR SELECT ARBOR 1. GARAGE DOOR
2. GLASS RAILING AND HANDRAILS
3. FOUR PANE WINDOW
7. COMPOSITE SIDING
1.g
Packet Pg. 1157 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:18:28 AM
COLORS AND MATERIALS A-6.2 08/15/2022
1.g
Packet Pg. 1158 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
METAL GATES
1 1/2" x 1 1/2" x 1 1/2" LONG ANGLE -
PUNCH 5/8" HOLE FOR CANE BOLT
& SLOT FOR TOP ANGLE
1/4" LONG 3/16" STL. ROD -
WELD TO CANE BOLT
1/2" DIA, 48" LONG CANE BOLT
6" LONG 7/8" DIA. PIPE
SLEEVE SET IN CONCRETE
3" MIN.
30" - 44" ABOVE FINISH GRADE
TOP VIEW
A-7.1
1 Sim
7' - 0"
1 13 2
7 11
3' - 0" 4' - 6"
ENCLOSURE
ROOF
6 8
A-7.1
3 Sim
2 6
METAL HINGE
ANCHOR TO STEEL
POST
2" TUBE STEEL
FRAME W/ DIAGONAL
BRACE ON
DUMPSTER SIDE OF
GATE
CORRUGATED STEEL
PANELMTD. BTWN.
STEEL FRAMES
811
NOTES
1. HSS 4x4x1/4 STEEL POST @ HINGE SIDE OF GATE,
CONC. FILLED, PRIMED AND PAINTED TO MATCH WALLS.
2. 18 GAUGE METAL FRAME TUBE STEEL.
3. GALVANIZED STEEL HARDWARE & FASTENERS.
4. RE: STRUCTURAL DRWGS FOR CONC. SLAB, REINFORCEMENT
& WALLS.
5. MOTION ACTIVATED, WALL-MOUNTED LED LIGHTING, VANDAL
RESISTANT.
6. 4'-6" DOOR TO BE EASILY ACCESSIBLE FOR RESIDENTS
TRASH / RECYCLING ACCESS.
7. STRESS PAD TO WITHSTAND MIN. WEIGHT OF 56,000 LBS
COLLECTION TRUCK.
8. GATES TO BE PAINTED TO MATCH BLDG ACCENT FEATURES.
9. DESIGN, ENGINEERING, AND CONSTRUCTION NOT SPECIFICALLY
NOTED SHALL BE IN ACCORDANCE WITH ACCEPTED INDUSTRY
STANDARDS AND OF FIRST QUALITY
10. SECONDARY CANE BOLT RETAINER TO BE PLACED FOR EACH
GATE SUCH THAT GATE IS HELD IN A POSITION 90° TO THE
CLOSED POSITION.
11. 20 GAUGE CORRUGATED METAL PANEL.
12. ANGLE IRON REINFORCED FASTENING ALONG EDGE OF
CORRUGATED PANEL AND METAL TUBE FRAME.
13. 1/2" DIA. STOCK SLIDE BARREL BOLT (LOCKABLE).
14. “12’x12” CONCRETE BUMBER STOP AND PERIMETER ENCLOSURE - “BERM” PER CITY WASTEWATER REQUIREMENTS”
CONCRETE BUMPER STOPS
SEE NOTE " 14.
96 GAL RECYCLE CARTS
2 YARD FRONT LOAD BINS
MIN. 12'-0" x 12'-0" STRESS PAD
W/ 60,000 LB. STRESS LOAD
TRASH / RECYCLING ENCLOSURE
6 A-7.1
STRESS PA
D
23' - 6"
AREA DRAIN, RE CIVIL DWG'S.
7 7
TOS Level 1
7 8
12" CONC.
BUMPER STOP
TRASH /
RECYCLING
ENCLOSURE
ENCLOSURE
ROOF
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:19:06 AM
TRASH / RECYCLING ENCLOSURE A-7.1 08/15/2022
3/8" = 1'-0" 1
LOCKING MECHANISM
3/8" = 1'-0" 2
TRASH / RECYCLING ENCLOSURE GATE
ELEVATION
3/8" = 1'-0"
3 TRASH / RECYCLING GATE DETAIL
3/8" = 1'-0"
4 TRASH / RECYCLING NOTES
1/4" = 1'-0"
5 TRASH-RECYCLING ENCLOSURE PLAN
1/4" = 1'-0"
6 TRSH / RECYCLING ENCLOSURE SECTION 8TRASH ENCLOSURE ISOMETRIC 7 1.g
Packet Pg. 1159 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 2'-0" 8'-0" 2'-0"
2'-6"
4'-8"
The
CONC. FTG. AT EACH PLATE
LEG, RE: STRUCT.
7'-2"
ELEVATION SECTION
CONC. FTG. AT EACH
PLATE RE: STRUCT.
NOTE:
PROVIDE WIRING AND WATER PROOF
GFI OUTLET WITH TIMER FOR BACK-LIT
LIGHTING FIXTURE
12' - 0"
90.00°
1/4" MAX. CLEAR PLASTIC
PANEL WITH PRINTED SITE
PLAN AND BACK LIT FOR
NIGHT TIME VIEWING
2" max.
8"
B r e a k w a t e r
EQ.1' - 6"EQ.
8' - 10 1/2"
1' - 2"8"
11"1' - 5 1/2"
M28
M27
M29
M27
M29
8' - 0"
1' - 10" 2' - 8" 4' - 8"
NOTE:
SEE SHEET A-1.11 FOR LOCATION OF
SIGNS ON SITE PLAN.
7 M19 M13 M6 M4 M1 M7 M6
M22 M25
M3 M19 M7 M14 M19
Murphy's Shop
12' - 0" 1' - 0"
Signage
M22
NOTE:
SEE ELEVATION SHEETS FOR ADDITIONAL
COLOR AND MATERIAL SCHEDULES
Signage
CONC. FTG. AT EACH PLATE
LEG, RE: STRUCT.
PLAN
M27
M29
M
1'-6".
u
1'-6".
LARGE & UPPER
CASE LETTERS
SMALL & LOWER
CASE LETTERS
1'-0".
1'-0".
SIGN THICKNESS
4" max.
M26
M25
NOTE: LETTER FONT TO BE LUCINDA BRIGHT OR EQUAL
M26
M26
* NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT
MATERIALS / APPLICATION COLORCODE MANUFACTURER
ILLUMINATED SIGNAGE COLOR/ MATERIAL SCHEDULE
M25SIGNAGE LENSES ILLUMINATED FACED CHANNEL
LETTER DISPLAY WITH THROUGH FACE
ILLUMINATION - LED
MATERIAL THICKNESS GUIDE:
LEXAN/PLEXIGLAS FACES .125” MIN
COLOR:
BANJAMIN MOORE - SALSA 2009-20
OR EQUAL.
LRV - 17.34
LEXAN, OR EQ.
M26SIGNAGE FRAMES & BACKING CRAFT SIGN WORKS, OR
EQ.
STANDARD ALUMINUM CONSTRUCTION;
ALUMINUM LETTER BACKS .063” MIN.
ALUMINUM LETTER RETURNS .040” MIN
FACTORY SPRAY APPLIED BONDING OF
3/32" ALUMINUM (ALUMINIZED
TREATMENT); FACTORY POWDER
COATED PAINT.
COLOR:
MATTHEWS PAINT - 41335SP ANODIC
BLACK LRV 4.3, OR EQUAL.
SATIN ACRYLIC POLYURETHANE FINISH
SIGNAGE
* NOTES: EXACT COLORS TO BE VERIFIED w/ OWNER & ARCHITECT
MATERIALS / APPLICATION COLORCODE MANUFACTURER
PROJECT ENTRY SIGN COLOR/ MATERIAL SCHEDULE
M27SIGN FRAME 1/4" MAX. CORTEN STL. FRAME WESTERN STATE METAL, OR EQ.
SIGN BODY - TOTAL OF TWO M28
PANELS (FRONT AND BACK)
WESTERN STATE METAL,
OR EQ.
1/4" MAX. CORTEN STL. PLATE ON FRONT
& BACK SIDE BOLTED TO STL. FRAME.
PROVIDE THROUGH HOLES IN STL. PLATE.
STL.
PANELS TO CONFORM TO ASTM A606
STANDARDS.
LASER CUT-OUT LETTERS IN PANEL WITH
FROSTED GLASS BACKING. LETTER TYPE
FONT TO BE "PRISTINA REGULAR"
BACK LIT WITH LED LIGHTING
SIGNAGE
M29SIGN LEGS SUPPORTS WESTERN STATE METAL,
OR EQ.
1/4" MAX. CORTEN STL. PLATE LEGS
MOUNTED TO CONC. FTG. WITH 4 BOLTS
AT EA. LEG AND ATTACHED TO SIGN
FRAME USING GALV. THROUGH BOLTS.
COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:19:26 AM
MASTER SIGN PROGRAM A-7.2 08/15/2022
N.T.S.
4 PROPERTY ENTRY SIGN & ORIENTATION SIGN RENDERINGS
3/16" = 1'-0" 7
Commercial - North Elevation Signage
3/8" = 1'-0"
1 PROPERTY ENTRY SIGN PLAN VIEW
6" = 1'-0" 6
SIGNAGE LETTER DIMENSIONS
1. A maximum of two autonomous commercial tenants
shall be allowed in building "A"
2. No animated, flashing, or audible signs will be
permitted.
3. No portable or temporary signs will be permitted at
any time without prior written approval of Landlord.
4. Grand Opening or promotion signs shall comply with
the City of Pacifica sign ordinance, shall have permits, and shall be approved by Landlord prior to installation and removed upon Landlord’request.
5. No exposed raceways, crossovers, or conduits will be permitted.
6. No signs of any kind will be permitted on building roofs or at any other locations other than those shown on the Sign Plan. All changes or deviations must be approved in writing by Landlord and may be subject to approval by
the City of Pacifica.
7. Except as provided here in and in the lease, no
advertising placards, banners, pennants, names, insignia, trademarks, or other descriptive materials of any kind
shall be affixed or maintained upon either the interior or exterior of the glass of the storefront and supports of the show windows and doors, or upon the exterior of the walls of the buildings, or within 10’ from storefront with in the Premises. These conditions apply to the entire term of the lease and apply to all SIGNAGE, whether
temporary, promotional, sale, permanent. etc.
8. At the expiration or termination of tenant’s lease,
Tenant shall be required to remove signs and patch the
building wall arcades and paint the patched area to
match the surrounding areas of the building. Landlord
retains sole judgment concerning the acceptability of the patching, and if Tenant cannot provide for acceptable
patching, Landlord may cause the work to be performed
using Landlord’s contractors and Tenant will pay the costs there of at receipt from Landlord of invoice for said work.
WHAT'S ALLOWED:
The intent of this sign criteria is to provide the guidelines necessary to achieve a visually coordinated, balanced and appealing sign environment, harmonious with the
architecture of the project, while maintaining provisions for individual graphic expression.
Performance of this sign criteria shall be rigorously
enforced and any nonconforming sign shall be removed
by the tenant or his sign contractor at their expense,
upon demand by the Landlord.
Exceptions to the standards would require Sign Design
Review application approval from the City of Pacifica, not a modification to the sign program.
Accordingly, the Landlord will retain full rights of approval for any sign at Breakwater.
No sign shall be installed without the written landlordapproval and the required permits.
1. Each tenant shall submit to Landlord for written
approval, three (3) copies of the detailed shop drawings of their proposed sign, indicating conformance with the sign criteria, prior to submitting to the City of Pacifica for permit.
2. The Landlord shall determine and approve the availability and position of a Tenant name on the Breakwater project entry sign.
3. The Tenant shall pay for all signs, related materials and installation fees (including final inspection costs).
4. The Tenant shall obtain all necessary permits.
5. The Tenant shall be responsible for fulfillment of all requirements of the sign criteria.
6. It is the responsibility of the Tenant’S sign company to verify all conduit and transformer locations and service access prior to fabrication.
7. Should a sign be removed and/or replaced with a new
sign it is the Tenant’S responsibility to patch all holes, paint surface to match the existing color, and restore
surface to original condition. If for whatever reason
the Tenant does not patch, repair holes, and repaint
the Landlord will do so and out charge the Tenant
accordingly.
CRITERIA:
12" = 1'-0" 5
PERSPECTIVE VIEW OF TYP.TENANT SIGN
3 3D CORNER ENTRANCE
1. Corner Entrance Building Tenant AC-1 may have one (2) signs on the North facade and (2) signs on the West facade.
Corner Entrance Building Tenant AC-2 may have one (1) sign on the North and one sign on the East facade. No signs are permitted on the South Fascia.
2. Corner Entrance Building Tenants signs may consist of name and logo. In their respective colors and letter fonts.
3. Corner Entrance Building tenant sign (copy & logo combined) may not exceed .75 sq. ft. of sign area per linear foot of store frontage, or 150 sq. ft. whichever is less, without City of Pacifica approval.
4. Letter height for Corner Entrance Building Tenants is 18” and maximum horizontal span is 75% of facade. The Minimum letter height is 12”, for desired distance readability.
5. Corner Entrance Building Tenants logos are permitted to be aligned in conjunction with tenant signage, the height for single line tenant signs is 18”.
CORNER R ENTRANCE BUILDING TENANTS SIGN SPECIFICATIONS:
6. All Corner Entrance Building Tenant signs are to be illuminated.
7. Each Corner Entrance Building Tenant shall be permitted to place upon each entrance of its demised Premises not more than 144 sq. inches of white vinyl lettering not to exceed two (2) inches in height, indication hours of business, emergency telephone numbers, and other type of information only, subject Landlord approval.
8. Signage shall be comprised of maximum, (1) line of copy and sign.
Vertically, bottom of signage shall align with bottom of header fascia re: 7/-.
9. All corner signs on North facade shall be centered above the building tenant entrance door and signs on the side facades shall be placed at equal distance from the edge.
10. Tenant AC-1 North signage, other than corner signage, shall be horizontally located between columns C & D.
1.g
Packet Pg. 1160 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) COPYRIGHT © 2023 ENVIRONMENTAL INNOVATIONS IN DESIGN. ALL RIGHTS RESERVED. 540 & 570 CRESPI DRIVE P A C I F I C A, C A L I F O R N I A 9 4 0 4 4
ENVIRONMENTAL INNOVATIONS IN DESIGN
412 OLIVE AVE. PALO ALTO, CA 94306
WWW.EIDARCHITECTS.COMPHONE: 650-226-8770
DATE SHEET TITLE SHEET NUMBER
10/27/2023 11:19:28 AM
TRAFFIC IMPACT ANALYSIS REPORT GB-3.1 08/15/2022
8 1.g
Packet Pg. 1161 Attachment: ATT F_Project Plans 2023-10-27 Architecture_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 543.30' 525.40'
S53°01'00"E N40°16'00"E
80.16' N65°26'00"W S40°16'00"W 83.13'
15 FL=11.17 RIM=14.54 W A A A A BB G2 G2 1 G2 V G2 V1 G2 G2 G2 1 G2 V G2 G2 G2 G2 G3 G2 G3 TELE WW GM UTELE W W A A A A AA G2 C C C C C C C C C 2 4 4 4 4 4 4 4 4 4 4 4 4 9 9 9 9 9 9 9 9 5 5 2 2 2 2 2 2 3 3 77 7 9 9 9 7 3 3 88 8 8 8 8 33 8 8 8 4 8 48 8 8 8 4 8 4 3 5 5 12 3 3 3 3 3 3 3 33 3 3 3 3 101010101010 22 3 3 101010 10 10 10 101010101010101010101010 10 10 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22222222222222222 222222 2 222222 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 8 8 8 2 3 3 3 3 3 3 3 3 3 3 4 3 4 4 3 4 3 3 3 3 1 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 11 1 2 1 1 2 1 2 2 22 2 1 11 2 1 1 2 4 4 4 4 1 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 33 1 1 12 2 1 3 2 2 3 2 1 3 2 1 5 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 1 1 5 1 1 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 555 555 3 3 3 3 3 33 3 3 33 2 3 3 1 3 3 3 2 2 5 3 1 1 3 1 5 3 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 5 5 5 55 5 5 55 5 5 5 55 5 5 5 55 5 5 5 55 5 55 5 5 55 5 5 5 55 5 4 9 5 4 4 3 4 4 4 4 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 9 9 9 4 9 9 9 9 9 9 9 9 9 9 5 2 2 2 2 2 2 7 9 9 9 9 9 9 9 9 7 9 9 9 9 9 7 9 3 7 9 8 8 8 7 8 8 4 3 8 4 8 4 8 8 8 8 8 4 8 8 4 8 4 8 8 8 8 8 8 4 12 5 12 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 3 3 3 2 2 33 2 3 3 3 3 3 3 2 33 3 3 3 3 3 3 3 3 3 3 3 3 3 4 3 7 8 4 3 7 8 4 9 8 9 9 9 9 9 8 9 9 9 9 9 9 5 9 9 9 9 9 3 9 2 33 3 5 5 5 5 1 5 3 5 5 5 5 1 5 5 5 5 2 2 3 3 3 1 1 3 2 1 2 5 1 11 1 2 5 3 3 2 5 5 5 5 5 5 5 5 3 5 2 5 2 5 5 1 5 5 5 5 1 3 3 5 5 5 5 5 5 5 5 5 5 5 5 5 4 55 5 5 5 4 5 5 9 5 8 5 4 8 7 5 5 5 9 9 9 9 8 8 8 8 7 7 777777777 9 9 9 9 9 9 9 9 9 9 9 9 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 121212 12 12 12 12 2 2 2 5 5 5 2 2 2 2 5 5 5 2 2 5 5 5 2 2 5 5 5 2 2 5 5 5 2 2 5 5 5 2 2 5 5 5 2 2 5 5 5 5 5 5 5555555555555555555555555555555555555555555555 5555 55 5555 5555 55 55 5 55 55 5 5 5 5 10"TREE (2)4"TREE 6"TREE6"TREE 8"TREE 7"TREE 33"PINE 35"/30"/36"/34" 39"CYPRESS 25"CYPRESS 14"CYPRESS 34"CYPRESS 48"CYPRESS 10"JUNIPER 2 3 46"/26"/18"/12"5 35"CYPRESS6 60"CYPRESS4 1 1 CYPRESS CLUSTER CYPRESS CLUSTER 38"CYPRESS 10"CYPRESS 8 13 9 10 11 12 10",12"CYPRESS 7 BUILDING B BUILDING C BUILDING A BUILDING D VACANT TO REMAIN UNDEVELOPED AREA (N) DRIVEWAY ASPHALT (N) DRIVEWAY ASPHALT(N) PARKING (N) PARKING (N) PARKING MATCHLINE MATCHLINE MATCHLINE MATCHLINE (N) DRIVEWAY ASPHALT (N) PARKING GRASSPAVE (N) PARKING GRASSPAVE (E) WILLOW ARROYO AREA WETLAND DELINEATION LINE WETLAND DELINEATION LINE (E) PATIO (E) PARKING LOT (N) DRIVEWAY ASPHALT(N) DRIVEWAY ASPHALT (N) PARKING (E) DRIVEWAY 1 07/23/19 M.C. L1.0 DATE: JUNE 4, 2022 SCALE: 1" = 20'-0" LANDSCAPE PLAN TITLE: SHEET NO: PLAN LANDSCAPE REVISIONS
MIXED USE PROJECT
540 & 570 CRESPI DRIVE PACIFICA, CALIFORNIA 2 10/28/19 M.C. 3 12/02/20 M.C. 3 3 3 4 06/4/22 M.C. 4 4 4 4 1.h Packet Pg. 1162
Attachment: ATT G_Landscape Plans_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 543.30' 525.40'
S53°01'00"E N40°16'00"E
80.16' S40°16'00"W
15 W
A
A
A
A
BB G2 G2
1 G2
V G2V1 G2 G2 G2
1 G2
V G2 G2 G2 G2 G3 G2 G3 GM
W
W G2
C
C
C
C
C
C
C
C
C
2 4 4 4 4 4 4 4
4 4 4 4 4
9 9 9 9 9 9 9 9
5 5
2 2
2 2 2
2 3
3 7
7 7
9 9 9
7 3
3 8
8 8
8 8
8 3
3 8
8 8
4 8
4 8
8 8 8
4 8
4 3
5 5 12
3 3
3 3
3 3
3 33
3 3
3 3 101010101010
2 2
3 3 101010 10 10 10 101010101010101010101010 10 10
2 2
2 2 2
2 2 22 2 22 22
2 2 2
2 2 22 2 2
2222222222
2 222
222
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2 2
2 2
2 2 2 2 2 2 2 2
2 2
2 2
2 2
2 2
2 2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
8 8
8 2
3 3
3 3
4 3
4 4 3
4 3
3 3
3 3
1 1
1 2
2 1
1 1
2 1
1 1
4 4
4 4 4
4 4 4 4 4
4 4 4
4 4 4
4 4 4 4 4
4 4
4 4 4 4 4
4 4
3 3
3 1
1 1
2 2
1 3
2 2
3 2 1
3 2
5 1
V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 5 1 1
5 5
5 5
5 5
5 5
5 5
5 5
5 5
5 5
5 5 5
5 5
5 5
5 5
5 5
5 5
5 5
5 5 5
5 5
5 5 5
5 5
5 5
5 5 5
5 5
5 5
5 5
5 5
5 5
5 5
3 3
3 3
3 3
3 2
3 3
1 3
3 2
2 5
3 1
1 3
1 3
5 5
4 9
4 4 4 4
2 4 4
4 4 4
4 4 4
4 4
4 4
4 4 4
4 4 4
4 4 4
9 9 9
4 9 9 9 9 9 9 9
9 9
9 5 2
2 2
2 2 2
7 9 9 9 9 9 9 9 9
7 9 9 9 9 9
7 9
3 7
9 8 88
7 8
8 4
3 8
4 8
4 8
8 8
8 8
4 8
8 4
8 4
8 8 8
8 8 8
4 12
5 12
3 2
2 2
2 2 2
2 2
2 2
2 2
2 2 2
2 2
2 2
2 2
2 2
2 2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
3 3
3 3
4 3
7 8
4 3
7 8
4 9
8 9 9
9 9
9 8
9 9
9 9
9 9
5 9 9
9 9 9 9
3 3
5 5 1
5 3
5 5
5 1
5 2
2 3
3 1
1 2
1 2
1 1
1 1
2 3
3 5
5 5
5 3
5 2
1 5
1 3
3 5
4 5
4 9
8 4
8 7
9 9 9
9 8
8 88
7 7
777777777
9 9 9 9 9 9 9 9 9 9 9 9 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 2 2 2 5 5 5
2 2 2 2 5 5 5
2 2 5 5 5
2 2 5 5 5
2 2 5 5 5
2 2 5 5 5
2 2 5 5 5
2 2 5 5 5 5 5 5 33"PINE 35"/30"/36"/34" 39"CYPRESS
2 3 46"/26"/18"/12"5 35"CYPRESS6 60"CYPRESS4
1 1 CYPRESS CLUSTER CYPRESS CLUSTER 10",12"CYPRESS 7 (N) DRIVEWAY ASPHALT (N) DRIVEWAY ASPHALT C R E S P I D R I V E (N) BUILDING POSTS *PER ARCH. DWGS. OUTLINE OF (E) HOUSE TO BE REMOVED (E) ADJACENT BUILDING (N) HANDICAP PARKING (N) PARKING (N) PEDESTRIAN PAINT STRIPING (N) ADDRESS / ORIENTATION SIGN (N) COLORED CONCRETE WALKWAY (E) CURB / GUTTER (E) CONCRETE (N) CONCRETE DRIVEWAY APPRON (E) UTILITY VAULT *SEE CIVIL DWGS. (N) PARKING (N) PARKING (N) COLORED CONCRETE CURB (TYP.) (N) BICYCLE STORAGE BUILDING B BUILDING C BUILDING A (N) PEDESTRIAN PAINT STRIPING (N) COLORED CONCRETE WALKWAY (N) COLORED CONCRETE CURB (TYP.) (N) DRIVEWAY ASPHALT (N) HANDICAP PAINT STRIPING (N) BUILDING POSTS (N) TRASH ENCLOSURE *SEE ARCH. DWGS. (N) ASPHALT DRIVEWAY ACCESS *SEE CIVIL DWGS. (N) FLOWERING TREES 5' 5' 10'-0"
10'-0"
SETBACK LINE (N) COLORED CONCRETE PATHWAY (N) NATIVE BIOSWALE GRASS (N) NATIVE WILLOW PLANTINGS (N) NATIVE GRASS (N) COLORED CONCRETE PATHWAY (E) TREES TO REMAIN *SEE (N) DRIVEWAY ASPHALT (N) PLANTING AREAS (N) LIVING WALL PER ARCH PLANS (N) LIVING WALL PER ARCH PLANS (N) LIVING WALL PER ARCH PLANS (N) FLOWERING TREES (N) DROUGHT TOLERANT GROUNDCOVER (N) DROUGHT TOLERANT GROUNDCOVER (N) NATIVE EVERGREEN TREES (9) 36" BOX SIZE (N) MAILBOXES *SEE ARCH DWGS (N) CONCRETE STEPPING PADS (N) WATER METERS LOCATION (N) CONCRETE SIDEWALK / CURB *INSTALL PER CITY (E) UTILITY COVERS (N) FIRE SERVICE BACKFLOW (E) UTILITY VAULT W/ SYNTHETIC STONE BOULDER COVER LIMIT OF AT&T VERIFY BY POT HOLING PRIOR TO CONSTRUCTION (N) ELECTRIC VEH. PARKING (N) HANDICAP RAMP *SEE CIVIL DWGS (N) CONCRETE SWALE *SEE CIVIL DWGS (N) PLANTING AREAS UNDERGROUND VAULT, SIDEWALK STDS *SEE CIVIL DWGS. *SEE CIVIL DWGS. DEVICE AREA PER CIVIL DWGS. (N) BOULDERS (N) BOULDERS (E) SIGNS (N) DRIVEWAY ASPHALT (N) PARKING (N) COLORED CONCRETE WALKWAY (N) COLORED CONCRETE CURB (TYP.) (N) WOOD DECK PATHWAY (N) COLORED CONCRETE PATHWAY (N) COLORED CONCRETE PATHWAY (N) GRASSPAVE *SEE CIVIL DWG'S (N) GRASSPAVE *SEE CIVIL DWG'S (N) DRIVEWAY STONE (E) WILLOW ARROYO AREA TO REMAIN (N) NATIVE ARROYO WILLOW PLANTINGS (#12) (N) NATIVE ARROYO WILLOW PLANTINGS (#12) (E) CYPRESS TREE TO BE REMOVED (E) CYPRESS TREE TO REMAIN (E) CYPRESS TREE TO BE REMOVED (E) DEAD PINE TREE TO BE REMOVED (E) CYPRESS TREE TO BE REMOVED (N) PERVIOUS CONCRETE PAVERS *INSTALL PER MANUFACTURER'S SPECS. (N) PERVIOUS CONCRETE PAVERS *INSTALL PER MANUFACTURER'S SPECS. (N) UNIT PAVER PERVIOUS (E) CYPRESS TREE TO BE REMOVED ARBORIST REPORT PARKING (N) PARKING 1 06/30/20 M.C. L1.1A DATE: SCALE: 1" = 10'-0" PLANTING PLAN TITLE: SHEET NO: PLAN LANDSCAPE REVISIONS
MIXED USE PROJECT
540 & 570 CRESPI DRIVE PACIFICA, CALIFORNIA
JUNE 4, 2022 GENERAL NOTES 1. CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO COMPLETE PROPOSED WORK PER CITY REQUIREMENTS. 2. CONTRACTOR SHALL VERIFY ON SITE ALL GRADES, PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, SITE IMPROVEMENTS, WATERPROOFING AND UNDERGROUND PIPING BEFORE CONSTRUCTION BEGINS. THE LANDSCAPE ARCHITECT ASSUMES NO LIABILITY FOR DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS. ALL DISCREPANCIES OR PROBLEMATIC SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT. 3. WORK WITHIN THE RIGHT OF WAY IS SUBJECT TO INSPECTION AND APPROVAL BY THE CITY. CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM PUBLIC WORKS DEPARTMENT PRIOR TO WORK WITHIN THE RIGHT OF WAY. THIS WORK MAY INCLUDE LANDSCAPING IN THE RIGHT OF WAY, NEW CURB DRAINS, AND PARKING STRIP. 4. FINISHED GRADES SHALL PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES AND SHALL BE PROPERLY INSTALLED TO PREVENT ANY STANDING WATER. ALL HARDSCAPE SHALL HAVE A MINIMUM GRADE OF 2% UNLESS NOTED OTHERWISE. JUTE MESH EROSION CONTROL NETTING SHALL BE USED ON ALL 3:1 OR GREATER SLOPES & STAKED APPROPRIATELY. 5. CONTRACTOR SHALL PROVIDE PROTECTION FOR EXISTING TREES BY INSTALLING TEMPORARY FENCING AROUND THE TREES AS CLOSE AS POSSIBLE TO THE DRIPLINE. IN THE EVENT THAT TREE ROOTS OVER 6" ARE DISCOVERED, THE LANDSCAPE ARCHITECT SHOULD BE CONTACTED. 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL, CIVIL, & OTHER ENGINEERING DRAWINGS / DOCUMENTS FOR WORK IN RELEVANT AREAS. 7. THE LANDSCAPE ARCHITECT MAY MAKE SITE OBSERVATIONS DURING CONSTRUCTION BUT SHALL NOT BE UTILIZED TO SUPERVISE CONSTRUCTION ONSITE. PLANTING NOTES 1. LANDSCAPE CONTRACTOR SHALL VERIFY PLANT AND SOD QUANTITIES PRIOR TO SUBMITTING BID FOR WORK. 2. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST STANDARDS OF NURSERY STOCK, PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION. 3. PLANT MATERIAL CANNOT BE GUARANTEED AS DEER RESISTANT DUE TO CHANGING HABITS OF DEER. 4. ALL PLANTING AREAS SHALL BE COVERED WITH A LAYER OF BARK MULCH TO A MINIMUM DEPTH OF 2 INCHES, WITH A CHIP SIZE OF NO LESS THAN ONE INCH. A 2 INCH LAYER OF GREENWASTE MULCH UNDER THE BARK MULCH IS RECOMMENDED. 5. SOIL AMENDMENTS SHALL BE USED AS NECESSARY. SOIL AMENDMENT SHALL BE FREE OF DEBRIS. ROCKS LARGER THAN ONE INCH DIAMETER WILL NOT BE PERMITTED. SOIL AMENDMENTS ARE NOT PERMITTED IN TYPICAL NATIVE PLANT LANDSCAPE AREAS. 6. PLANTING HOLES SHALL GENERALLY BE 2x - 3x THE SIZE OF THE ROOT BALL. THE WALLS AND BASES OF PLANT HOLES SHALL BE SCARIFIED. HOLES SHALL BE BACKFILLED WITH 5% ORGANIC COMPOST & 95% EXISTING SOIL. PLANTING HOLES OF NATIVE PLANT MATERIAL SHOULD BE INOCULATED WITH MYCORRHIZAL FUNGI, PER MANUFACTURER'S SPECS. 7. TREES SHALL BE STAKED WITH TWO PRESSURE TREATED 2" DIA. POLES. TREE TRUNK SHALL BE SECURED WITH TWO RUBBER TIES OR STRAPS FORMING A FIGURE-EIGHT BETWEEN TRUNK AND STAKE. 8. RESIDUAL WEED PRE-EMERGENT SHALL BE APPLIED BY THE CONTRACTOR AS NECESSARY. APPLICATION SHALL BE ACCORDING TO MANUFACTURER'S INSTRUCTIONS. 9. LAWN SHALL NOT BE INSTALLED ON SLOPES GREATER THAN 25%. ALL TURF AREAS SHALL BE FERTILIZED AT TIME OF INSTALLATION. LOT COVERAGE CALCULATIONS SITE MAP BUILDING B BUILDING C BLDG. VACANT
A TO REMAIN UNDEVELOPED AREA BUILDING D SCOPE OF WORK SCOPE OF WORK 1 1
1 1
1 2 12/02/20 M.C.
2 2
2 2 *SEE CIVIL ENGINEERING CALCS/PLANS
2 3 04/15/22 M.C.
3 3
3 3
4 4 4 06/04/22 M.C.
4 4
4 4
4 1.h
Packet Pg. 1163
Attachment: ATT G_Landscape Plans_251202 (6098 : Crespi Drive Mixed Use Project Considerations) 15 FL=11.17 RIM=14.54 W G2 G2 G2 G2 G2 G2 G2 G3
TELE WW GM UTELE W W A A A A AA B G2 4 4 4 4 4 77 7 9 9 9 12 3 33 3 3 2 10 10 10 10101010 222222 3 3 3 3 3 3 3 3 3 3 4 3 4 4 3 4 3 3 3 3 1 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 11 1 2 1 1 2 1 2 2 22 2 1 11 2 1 1 2 4 4 4 4 1 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 33 1 1 12 2 1 3 2 2 3 2 1 3 2 1 5 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 V 1 1 1 5 1 1 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 555 555 3 3 3 3 3 33 3 3 33 2 3 3 1 3 3 3 2 2 5 3 1 1 3 1 5 3 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 5 5 5 55 5 5 55 5 5 5 55 5 5 5 55 5 5 5 55 5 55 5 5 55 5 5 5 55 5 5 4 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 7 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 12 12 3 3 3 3 3 33 3 3 3 3 3 3 33 3 3 3 3 3 3 3 3 3 3 3 3 3 4 3 7 4 3 7 9 9 9 9 9 9 9 5 9 9 3 2 33 3 5 5 5 5 1 5 3 5 5 5 5 1 5 5 5 5 2 2 3 3 3 1 1 3 2 1 2 5 1 11 1 2 5 3 3 2 5 5 5 5 5 5 5 5 3 5 2 5 2 5 5 1 5 5 5 5 1 3 3 5 5 5 5 5 5 5 5 5 5 5 5 5 4 55 5 5 5 5 5 5 5 7 5 5 5 9 9 9 7 7 777777777 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 5555555555555555555555555555555555555555555555 5555 55 5555 5555 55 55 5 55 55 5 5 5 5 25"CYPRESS 14"CYPRESS 34"CYPRESS 48"CYPRESS 10"JUNIPER 46"/26"/18"/12"5 35"CYPRESS6 60"CYPRESS4 CYPRESS CLUSTER 38"CYPRESS 10"CYPRESS 8 13 9 10 11 12 (N) (N) PARKING BUILDING B (N) PEDESTRIAN PAINT STRIPING (N) COLORED CONCRETE WALKWAY (N) COLORED CONCRETE CURB (TYP.) (N) BUILDING POSTS (N) TRASH ENCLOSURE *SEE ARCH. DWGS. (N) ASPHALT DRIVEWAY ACCESS *SEE CIVIL DWGS. 5' 10'-0" (N) COLORED CONCRETE PATHWAY (N) NATIVE WILLOW PLANTINGS (N) NATIVE GRASS (N) LIVING WALL PER ARCH PLANS (N) LIVING WALL PER ARCH PLANS (N) DROUGHT TOLERANT GROUNDCOVER (N) MAILBOXES *SEE ARCH DWGS (N) CONCRETE STEPPING PADS (E) UTILITY VAULT W/ LIMIT OF AT&T VERIFY BY POT HOLING PRIOR TO CONSTRUCTION (N) HANDICAP RAMP *SEE CIVIL DWGS (E) CONCRETE PATH (N) PLANTING AREAS (N) ASPHALT PARKING (E) CONCRETE PATH (N) PEDESTRIAN CROSS WALK STRIPING (N) PLANTING AREAS (N) PLANTING AREAS (E) DRIVEWAY (E) JUNIPER TREE TO REMAIN LAWN *RETROFIT (E) IRRIGATION SYSTEM C R E S P I D R I V E (E) CYPRESS TREE TO REMAIN (E) CONCRETE SIDEWALK (E) CONCRETE CURB (E) LAWN (E) LAWN (E) LAWN (E) CONCRETE WALKWAY (E) CONCRETE SIDEWALK (E) SIGNAGE (E) CYPRESS TREE TO REMAIN (E) UTILITY VAULTS (N) HAND PARKING SPACE PARKING SPACES (N) ASPHALT ENCLOSURE (N) TRASH COMMUNITY CENTER (E) UNDERGROUND VAULT, (E) LIGHT (E) ARBOR TO REMAIN (E) PATH (E) SIGNS (E) LIGHTS (E) PATIO BUILDING (N) PLANTINGS (N) CONCRETE CURB *SEE CIVIL DWGS. (N) DRIVEWAY ASPHALT(N) DRIVEWAY ASPHALT (N) FLOWERING CRAPE (N) BOULDERS (E) PATH (E) CONCRETE CURB *SEE CIVIL DWGS. (E) CONCRETE CURB *SEE CIVIL DWGS. (N) BOULDERS (N) BOULDERS (N) 6'-0" STEEL / (E) UTILITY VAULTS (E) WATER METERS (N) BOULDERS (N) PLANTINGS (E) LAWN (N) BOULDERS (N) BOULDERS (E) SIGNS (N) BOULDERS (N) EVERGREEN HEDGE (E) CONCRETE CURB *SEE CIVIL DWGS. WIRE MUSH FENCING (N) CYPRESS TREE TO MATCH (E) (E) LANDSCAPE AREA (E) LANDSCAPE AREA (E) LANDSCAPE AREA (E) PARKING LOT (E) DRIVEWAY (E) PARKING LOT (N) COLORED CONCRETE PATHWAY (E) WILLOW ARROYO AREA (N) NATIVE ARROYO WILLOW PLANTINGS (#12) (N) NATIVE ARROYO WILLOW PLANTINGS (#12) (E) CYPRESS TREE TO BE REMOVED (E) CYPRESS TREE TO REMAIN (E) CYPRESS TREE TO BE REMOVED 15'-0" MYRTLE TREES (E) CYPRESS TREES TO REMAIN (2) (N) DRIVEWAY ASPHALT (E) CYPRESS TREE TO REMAIN (N) FLOWERING TREES (N) PERVIOUS CONCRETE PAVERS *INSTALL PER MANUFACTURER'S SPECS. (N) PERVIOUS CONCRETE PAVERS *INSTALL PER MANUFACTURER'S SPECS. (N) UNIT PAVER PERVIOUS 15'-0" (E) CYPRESS TREE TO REMAIN (N) PARKING (N) PARKING (N) PARKING (N) PARKING (N) PARKING 1 06/04/2022 M.C. L1.1B DATE: SCALE: 1" = 16'-0" PLANTING PLAN TITLE: SHEET NO: PLAN LANDSCAPE REVISIONS
MIXED USE PROJECT
540 & 570 CRESPI DRIVE PACIFICA, CALIFORNIA
JUNE 4, 2022 IRRIGATION NOTE: CONTRACTOR SHALL RETROFIT THE EXISTING IRRIGATION TO ADJUST SPRAY HEADS IN LAWN AREAS AND INSTALL DRIP TUBING TO ALL OTHER AREAS SHOWN TO BE NEWLY PLANTED ON THIS PLAN. EXISTING VALVES AND FILTERS SHALL BE INSPECTED TO ENSURE THEY ARE IN GOOD WORKING AS WELL AS THE IRRIGATION CONTROLLER PLANTING NOTES 1. LANDSCAPE CONTRACTOR SHALL VERIFY PLANT AND SOD QUANTITIES PRIOR TO SUBMITTING BID FOR WORK. 2. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST STANDARDS OF NURSERY STOCK, PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION. 3. PLANT MATERIAL CANNOT BE GUARANTEED AS DEER RESISTANT DUE TO CHANGING HABITS OF DEER. 4. ALL PLANTING AREAS SHALL BE COVERED WITH A LAYER OF BARK MULCH TO A MINIMUM DEPTH OF 2 INCHES, WITH A CHIP SIZE OF NO LESS THAN ONE INCH. A 2 INCH LAYER OF GREENWASTE MULCH UNDER THE BARK MULCH IS RECOMMENDED. 5. SOIL AMENDMENTS SHALL BE USED AS NECESSARY. SOIL AMENDMENT SHALL BE FREE OF DEBRIS. ROCKS LARGER THAN ONE INCH DIAMETER WILL NOT BE PERMITTED. SOIL AMENDMENTS ARE NOT PERMITTED IN TYPICAL NATIVE PLANT LANDSCAPE AREAS. 6. PLANTING HOLES SHALL GENERALLY BE 2x - 3x THE SIZE OF THE ROOT BALL. THE WALLS AND BASES OF PLANT HOLES SHALL BE SCARIFIED. HOLES SHALL BE BACKFILLED WITH 5% ORGANIC COMPOST & 95% EXISTING SOIL. PLANTING HOLES OF NATIVE PLANT MATERIAL SHOULD BE INOCULATED WITH MYCORRHIZAL FUNGI, PER MANUFACTURER'S SPECS. 7. TREES SHALL BE STAKED WITH TWO PRESSURE TREATED 2" DIA. POLES. TREE TRUNK SHALL BE SECURED WITH TWO RUBBER TIES OR STRAPS FORMING A FIGURE-EIGHT BETWEEN TRUNK AND STAKE. 8. RESIDUAL WEED PRE-EMERGENT SHALL BE APPLIED BY THE CONTRACTOR AS NECESSARY. APPLICATION SHALL BE ACCORDING TO MANUFACTURER'S INSTRUCTIONS. 9. LAWN SHALL NOT BE INSTALLED ON SLOPES GREATER THAN 25%. ALL TURF AREAS SHALL BE FERTILIZED AT TIME OF INSTALLATION. 1 11 1 1 1 1 1 1 1 1 1.h Packet Pg. 1164
Attachment: ATT G_Landscape Plans_251202 (6098 : Crespi Drive Mixed Use Project Considerations) W GM
W (N) TIMER/ CONTROLLER (N) BACKFLOW PREVENTION DEVICE (N) WATER METER LOCATION (N) 'NETAFIM' SUBSURFACE DRIP TUBING (N) 'NETAFIM' SUBSURFACE DRIP TUBING (N) 'NETAFIM' SUBSURFACE DRIP TUBING (N) LIVING WALL DRIP (N) LIVING WALL DRIP (N) LIVING WALL DRIP (N) 'NETAFIM' SUBSURFACE DRIP TUBING (N) 'NETAFIM' SUBSURFACE DRIP TUBING (N) 'NETAFIM' SUBSURFACE DRIP TUBING 1-1/2" PVC SCH 40 MAINLINE 1-1/2" PVC SCH 40 MAINLINE 1-1/2" PVC SCH 40 MAINLINE 1-1/2" PVC SCH 40 MAINLINE 1-1/2 PVC SCHEDULE 40 MAINLINE 1-1/2 PVC SCH 40 MAINLINE *WITH 4" SLEEVING 1-1/2 PVC SCH 40 MAINLINE *WITH 4" SLEEVING 1-1/2" PVC SCH 40 MAINLINE *WITH 4" SLEEVING BUILDING B BUILDING C BUILDING A
C R E S P I D R I V E (N) 'NETAFIM' SUBSURFACE DRIP TUBING 1MX 2MX 3MX
6MX5MX
4MX
8MX7MX 10MX9MX 12MX 11MX 15MX 19MX 18MX 16MX 17MX 24MX 25MX 26MX 22MX 23 20 MX MX 14MX 13MX 21MX L2.0 DATE: SCALE: 1" = 10'-0" IRRIGATION PLAN TITLE: SHEET NO: PLAN IRRIGATION REVISIONS
MIXED USE PROJECT
540 & 570 CRESPI DRIVE PACIFICA, CALIFORNIA FILTER / PRESSURE REGULATOR FEBCO 825Y REDUCED PRESSURE ASSEMBLY PVC SCH 40 SLEEVING IRRIGATION LEGEND DESCRIPTION PVC SCH 40 LATERAL PIPING PVC SCH 40 MAINLINE IRRITROL 100 SERIES CONTROL VALVE SHUT-OFF VALVE SYM UNDER ALL PAVING / WALLS AS NEEDED PER MFR'S SPECS SIZING TBD BY CONTRACTOR W/ GLOBE VALVE W/ SHUT-OFF VALVES BRASS BALL VALVE REMARKS SEE PLAN FOR SIZING WEATHERMATIC SMARTLINE SERIES CONTROLLER W/ WEATHER STATION HOSEBIB 30" TALL BRASS LINE & FIXTURE 60-100 -- 60-100 60-100- 175 max. PSI 30-55 10-30 60-100 RAINBIRD XERI-BUBBLER SPIKE *NOT SHOWN 15-30 AS NEEDED, SEE DETAIL- INSTALL PER MFR'S SPECS GPM ----- .02-.22------ NETAFIM TECHLINE CV DRIPLINE SIZING TBD BY CONTRACTOR NETAFIM TECHLINE CV (SUBSURFACE) JUNE 6, 2022 M2 HYDROZONE # / WATER USE (VL, L, M, or H) (VL)-VERY LOW, (L)-LOW etc. 1.h Packet Pg. 1165
Attachment: ATT G_Landscape Plans_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
MIXED USE PROJECT
540 & 570 CRESPI DRIVE PACIFICA, CALIFORNIA L2.5 DATE: TITLE: SHEET NO: DETAILS NOTES / REVISIONS WATER CONSERVATION IN LANDSCAPING ORDINANCE COMPLIANCE THESE PLANS COMPLY WITH THE CRITERIA OF THE WATER CONSERVATION IN LANDSCAPING ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE AND IRRIGATION DESIGN PLAN. WEATHERMATIC SMART CONTROLLER B SCALE: NTS SMARTLINE SL4800 CONDUIT 24v AC CONTROLLER POWER SUPPLY WIRES GROUND WIRE SLW10 WEATHER STATION CONDUIT 115v AC *WALL-MOUNT RAIN STAT WIRES *OPTIONAL MASTER VALVE WIRE *OPTIONAL COMMON NEUTRAL WIRE PUMP CIRCUIT WIRES *OPTIONAL VALVE CONTROL WIRES *ONE PER VALVE EXPANSION COILS WATERPROOF CONNECTIONS CONTROL VALVE NOTE: ALL ELECTRICAL WORK TO COMPLY WITH APPLICABLE CODES *12-48 ZONES EMITTER / EMITTER SPACING G SCALE: NTS EMITTER / LARGE SHRUB SMALL SHRUB 1/2" - 3/4" POLY TUBING 1/4" DISTRIBUTION TUBING *STAKED 1/2" - 3/4" POLY TUBING 5'-0" MAX. LENGTH BUBBLER BUBBLER OR TREE 1/4" DISTRIBUTION TUBING *STAKED 5'-0" MAX. LENGTH NOTES: 1. SPACE EMITTERS TO CREATE AN EVEN WET ZONE ABOUT THE SIZE OF THE CANOPY OF ALL NEW SHRUBS, NEW TREES, & EXISTING 2. PLACE EMITTERS AS TO AVOID AS MUCH AS POSSIBLE IRRIGATING OAK TREES & ANY OTHER EXISTING, MATURE NATIVE OR DROUGHT TOLERANT PLANTS. IMMATURE NON-NATIVE EXISTING TREES. CONTROL VALVE C SCALE: NTS FINISHED GRADE VALVE BOX WATERPROOF WIRE CONNECTIONS IRRITOL 100 SERIES CONTOL VALVE PVC MALE ADAPTER PVC SCH 40 SxT ELL PVC SCH 80 NIPPLE *6" LONG PVC LATERAL LINE *ANGLE TO CORRECT DEPTH W 450 ELL'S TYP BRICK PEA GRAVEL *12" DEEP PVC SCH 80 PIPE COMMON & CONTROL WIRES TO CONTROLLER MAIN LINE PIPING W/ FITTING NOTE: ALL ELECTRICAL WORK TO COMPLY WITH APPLICABLE CODES FEBCO 825Y REDUCED REDUCED PRESSURE ASSEMBLY A SCALE: NTS 12" MIN. PRESSURE ASSEMBLY FINISHED GRADE NOTE: REDUCED PRESSURE ASSEMBLY TO BE INSTALLED PER MFR'S FEBCO PRV SERIES PRESSURE REGULATOR *AS NEEDED BRASS WYE-FILTER *100 MESH SCREEN SHUT-OFF VALVE *BOTH SIDES BRASS UNION *BOTH SIDES RISER PIPE *COPPER TYPE 'K' OR BRASS SPECS & APPLICABLE CODES IRRIGATION NOTES 1. THE CONCEPTS ON THE IRRIGATION PLAN ARE SCHEMATIC MINIMUM REQUIREMENTS, THE FULL EXTENT OF WHICH ARE TO BE DETERMINED BY THE CONTRACTOR. THE CONTRACTOR SHALL MAKE ADJUSTMENTS AS NECESSARY BASED ON ACTUAL SITE CONDITIONS. 2. ALL IRRIGATION SYSTEM COMPONENTS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. MANUFACTURER'S SPECIFICATIONS SUPERSEDE ANY SPECS ON THESE PLANS / DETAILS. 3. IRRIGATION SYSTEM SHALL USE PRESSURE REGULATORS AS NEEDED TO KEEP ALL COMPONENTS WITHIN OPTIMAL PSI RANGE, PER MANUFACTURER'S SPECS. 4. CONTROLLER TYPE SHALL BE A SMART CONTROLLER. RAIN SENSORS AND / OR WEATHER STATIONS ARE RECOMMENDED. 5. CONTROLLER SHALL BE SET TO IRRIGATE BETWEEN THE HOURS OF 8PM AND 10AM. CONTROLLER SHALL BE SET TO IRRIGATE DEEPLY AND LESS FREQUENTLY TO ENCOURAGE DROUGHT RESISTANT ROOT GROWTH. IRRIGATION SCHEDULE TO BE DETERMINED BY AUDITOR / CONTRACTOR. 6. PIPING BETWEEN THE WATER METER AND A REDUCED PRESSURE ASSEMBLY SHALL BE BRASS OR COPPER TYPE 'K'. 7. THE BOTTOM OF THE REDUCED PRESSURE ASSEMBLY SHALL BE INSTALLED MIN. 12" ABOVE THE GROUND. 8. A 100 MESH FILTER SHALL BE INSTALLED ON THE MAINLINE BEFORE THE REDUCED PRESSURE ASSEMBLY. 9. VALVES SHALL BE HOUSED IN WEATHER-PROOF PLASTIC BOXES, WITH LOCKABLE LIDS MARKED WATER. 10. CONTROL WIRE CONNECTIONS SHALL BE MADE WITH WATERPROOF PLASTIC WIRE NUTS. 11. MAIN SUPPLY LINES & FITTINGS SHALL BE PVC SCH 40, SIZE AS NOTED ON PLAN, BURIED 12" - 16" DEEP. 12. LATERAL SUPPLY LINES & FITTINGS SHALL BE PVC SCH 40, SIZE TO BE DETERMINED BY CONTRACTOR, BURIED 9" - 12" DEEP. 13. FLEXIBLE POLY PIPE TO BE 12" -34", DETERMINED BY CONTRACTOR . ALL 14" FLEXIBLE DISTRIBUTION LINES TO BE A MAXIMUM OF 5'-0" IN LENGTH & ARE TO BE STAKED. 14. BUBBLERS SHALL BE SPACED TO CREATE AN EVEN WET ZONE ABOUT THE SIZE OF THE CANOPY OF ALL NEW SHRUBS, NEW TREES & EXISTING IMMATURE NON-NATIVE TREES. BUBBLERS SHALL BE PLACED TO AVOID AS MUCH AS POSSIBLE IRRIGATING OAK TREES & ANY OTHER EXISTING, MATURE NATIVE OR DROUGHT TOLERANT PLANTS. 15. HOSE BIBS SHALL BE MOUNTED ON GALVANIZED STEEL RISERS 30" ABOVE FINISHED GRADE. SECURE TO A #4 STEEL BAR DRIVEN 18" INTO SOLID GROUND. 16. CHECK VALVES SHALL BE INSTALLED ON ALL DOWNHILL DRIPLINE & DISTRIBUTION LINE. 17. RISER HEIGHT IN LAWN AREAS SHALL BE 4". RISER HEIGHT IN MEADOW AREAS AND OTHER LANDSCAPE AREAS SHALL BE 12". THE RISERS FOR SPRINKLERS ON SLOPES SHALL BE SET APPROXIMATELY PERPENDICULAR TO THE PLANE OF THE SLOPE. 18. IF LOCATION OF A SUPPLY LINE INTERFERES WITH THE DRILLING OF THE PLANT HOLES, THE PLANT HOLES SHALL BE LOCATED AS TO CLEAR THE SUPPLY LINES. 18. ALL LINES SHALL BE THOROUGHLY FLUSHED OUT PRIOR TO ATTACHMENT OF VALVES, SPRINKLERS, EMITTERS, & OTHER TERMINAL FITTINGS. 19. THE CONTRACTOR SHALL MAKE FINAL ADJUSTMENTS TO THE IRRIGATION SYSTEM TO ENSURE PROPER COVERAGE AND PREVENT WATER RUN-OFF AND EXCESS SPRAY. 20. ALL SPRAY AND DRIP ZONES TO BE MIN. 5'-0" AND PREFERABLY 10'-0" AWAY FROM OAK TREE TRUNKS. SPRAY HEAD & BODY D SCALE: NTS FINISH GRADE HUNTER MPR40 BODY HUNTER MP ROTATOR W/ CHECK VALVE HUNTER PRO-FLEX TUBING, (2) HSBE-050 ELBOWS & (1) MARLEX STREET ELBOW SWING JOINT: LATERAL TEE OR ELL LATERAL PIPE SPRAY NOZZLE NOTE: LAWN SPRAY RISER: 6" POP-UP MEADOW SPRAY RISER: 12" POP-UP FINISHED GRADE POP-UP MICROSPRAY F SCALE: NTS XERI-POP MICROSPRAY 1/2" or 3/4" POLY TUBING 1/4" SELF-PIERCING BARB CONNECTOR 1/4" DISTRIBUTION TUBING NOTE: LAWN SPRAY RISER: 6" POP-UP MEADOW, SHRUB SPRAY RISER: 12" POP-UP DRIPLINE SAMPLE LAYOUT E SCALE: NTS AUTOMATIC FLUSH VALVE PLUMBED TO PVC OR POLY EXHAUST HEADER TECHLINE TEE TECHLINE DRIPLINE *CENTERED ON BERM TECHLINE DRIPLINE TECHLINE START CONNECTION AIR / VACUUM RELIEF PLUMBED TO TECHLINE AT EACH HIGH POINT SUPPLY HEADER REMOTE CONTROL VALVE WITH DISC FILTER AND PRV SOIL BED SPACING TECHLINE MULCH FINISHED GRADE PER SOIL CONDITIONS DRIPLINE MALE ADAPTER DECEMBER 16, 2019
1.h
Packet Pg. 1166
Attachment: ATT G_Landscape Plans_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1167
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1168
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1169
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1170
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1171
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1172
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1173
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations)
1.i
Packet Pg. 1174
Attachment: ATT H_Vesting Tentative Map Civil_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 1 | Page
Brendan Murphy
Bayworks Construction, Inc.
P.O.Box 301
San Mateo, CA 94401
Site: 540 and 570 Crespi Dr, Pacifica
Dear Brendan,
At your request I visited the above site for the purpose of inspecting and commenting on the Regulated around the property. A new construction is planned, prompting the need for this tree protection report.
This report supersedes previous reports dating back to 2018. Since the first report was generated in December 7, 2018, more trees have been added to the scope of the report, some trees have grown and become Heritage trees, some trees have declined and others have completely died.
Method:
The City of Pacifica regulates Protected Trees and Heritage Trees “Protected tree" shall mean and include:
(1) All trees on public and private property within the City of Pacifica, which have a trunk with a diameter of twelve (12") inches or greater at DBH.
(2) Any heritage tree designated by the Director.
(3) Any groves of trees.
(4) Eucalyptus and any species determined invasive by the California Invasive Plants Council are not protected by this chapter, except groves of trees and as the director may deem otherwise. “Heritage tree” shall mean and include
(1) Any trees that are of the species Quercus agrifolia (coast live oak), Quercus lobata (valley oak), Aesculus californica (California buckeye), Pinus radiata (Monterey pine), or Sequoia sempervirens (redwood), which have a trunk diameter of twelve (12") inches or more; or (2) Any trees that are of the species Heteromeles arbutifolia (toyon) which have a trunk diameter of four (4") inches DBH or more.
(3) The Director may also designate heritage trees that meet any of the following criteria:
i. Tree(s) of historic value;
1.j
Packet Pg. 1175 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 2 | Page
ii. Specimen tree(s) of any species;
iii. Any tree of substantial size of its species;
iv. is one of the largest and oldest trees in Pacifica; or v. Significant habitat value.
The location of the regulated trees on this site can be found on the plan provided by you. Each tree is given an identification number. The trees are measured at 54 inches above ground level (DBH or Diameter at Breast Height). A condition rating of 1 to 100 is assigned to each tree representing form and vitality on the following scale:
1 to 29 Very Poor
30 to 49 Poor
50 to 69 Fair
70 to 89 Good
90 to 100 Excellent
The height and spread of each tree is estimated. A Comments section is provided for any significant observations affecting the condition rating of the tree.
A Summary and Tree Protection Plan are at the end of the survey providing recommendations for maintaining the health and condition of the trees during and after construction.
If you have any questions, please don’t hesitate to call.
Sincerely
Robert Weatherill
Certified Arborist WE 1936A
1.j
Packet Pg. 1176 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 3 | Page
Tree Survey
Tree# Species DBH Ht/Sp Con Rating Comments
1 Monterey cypress 35.1”/30.3”/36.7”/34.3” 60/50 60 Fair health and condition Cupressus macrocarpa Unmaintained, large tree with
multiple trunks from grade. Multiple
limb failure on south side of canopy
Protected
3 Monterey cypress 39.0” 50/30 50 Fair health and condition, Cupressus macrocarpa Unmaintained, trimmed for
PG and E. Protected
4 Monterey cypress 60” 50/50 35 Poor health and condition, declining Cupressus macrocarpa Unmaintained, large tree with some large dead wood and broken limbs
Storm damage from recent storms
Protected
5 Monterey cypress 46.3”/26.1”/18.2”/12.6” 50/60 50 Fair health and condition Cupressus macrocarpa Unmaintained, large tree with
multiple trunks from grade. Storm
damage from recent storms. Protected
6 Monterey cypress 35.2” 30/40 60 Fair health and condition, Cupressus macrocarpa Unmaintained. Protected
7 Monterey cypress 12.6/10.2” 20/20 60 Good health, fair condition, Cupressus macrocarpa multi stemmed at grade
Protected
8 Monterey cypress 48.7” 35/40 60 Fair health and condition, topped Cupressus macrocarpa and raised up. Full of dead wood.
Protected
9 Monterey cypress 38.2” 30/30 60 Fair health and condition, topped Cupressus macrocarpa and raised up. Full of dead wood.
Protected
10 Monterey cypress 34.0” 30/30 60 Fair health and condition, topped Cupressus macrocarpa and raised up. Full of dead wood.
Protected
11 Monterey cypress 25.5” 20/25 40 Poor health and condition, thin Cupressus macrocarpa canopy and full of dead wood.
Protected
12 Hollywood juniper 10 at 4 to 5” diameter 18/20 70 Good health and condition, multi Juniperus ‘Hollywood’ trunked at grade. Protected
13 Monterey cypress 25.5” 25/30 60 Fair health and condition, topped Cupressus macrocarpa and raised up. Full of dead wood.
Protected
1.j
Packet Pg. 1177 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 4 | Page
Summary:
The trees on the site are mostly coastal native trees in varying health and condition. The trees can be seen in the attached photos.
Tree # 1 is a large Protected Monterey cypress. The tree has not been maintained for many years and is in fair health and condition. It has multiple trunks from grade, the canopy is thick and healthy but has collapsed on the south side of the tree. The tree is located in the middle of the lot at the front of the property. The proposed construction will be at the front of the property to preserve the natural swale and wildlife area at the rear of the property; therefore, this tree will be removed. Its location and the location of the proposed construction can be seen on the attached drawing.
Tree # 2 which is marked on the drawing to be removed, was dead and fell in a storm.
Tree # 3 is a Protected Monterey cypress at the front corner of the property. The tree is in fair health and condition but poorly located. The tree has many broken branches, and the canopy has been heavily pruned on one side to accommodate PG and E. This tree should be removed but it has been requested to be retained and protected during construction.
Appraised value of tree $16,300.00. See Addendum for calculation.
Tree # 4 is a Protected Monterey cypress located on the adjacent property. The tree is in poor health and condition and is located very close to the proposed construction. The tree may not survive construction but all attempts to work around the tree and keep it alive will be made.
Storm damage from recent storms has partially removed one side of the canopy of the tree.
Tree #s 5 and 6 are Protected Monterey cypresses in fair health and condition but have not been maintained for many years. Both trees will be removed. Storm damage from recent storms has partially removed one side of the canopy of the tree
Tree # 7 has become a Protected Monterey cypress since the project began. The tree is very close to a utility vault and will be removed
Tree #s 8, 9, 10, 11, 12 and 13 are Protected trees that will be retained and should be protected during construction.
4 Protected trees will be removed; Tree #s 1, 5, 6 and 7. There should be a tree replacement plan to accommodate the loss of canopy on this site.
As of July 15, 2024, there are no additional trees that have become Protected since the previous update of this report, March 17, 2023.
1.j
Packet Pg. 1178 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 5 | Page
Tree # 1: Monterey Cypress
1.j
Packet Pg. 1179 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 6 | Page
Tree # 3: Monterey Cypress
1.j
Packet Pg. 1180 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 7 | Page
Tree # 4 Monterey cypress
1.j
Packet Pg. 1181 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 8 | Page
Tree # 5 Monterey cypress
1.j
Packet Pg. 1182 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 9 | Page
Tree # 6 Monterey cypress
1.j
Packet Pg. 1183 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 10 | Page
Tree # 7 Monterey cypress
1.j
Packet Pg. 1184 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 11 | Page
Tree # 8 Monterey cypress
1.j
Packet Pg. 1185 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 12 | Page
Tree #s 9 and 10 Monterey cypress
1.j
Packet Pg. 1186 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 13 | Page
Tree # 11 Monterey cypress
1.j
Packet Pg. 1187 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 14 | Page
Tree # 12 Hollywood juniper
1.j
Packet Pg. 1188 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 15 | Page
Tree # 13 Monterey cypress
1.j
Packet Pg. 1189 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 16 | Page
Location of existing Protected trees, proposed tree removals and Tree Protection Zones
1.j
Packet Pg. 1190 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 17 | Page
Tree Protection Plan in accordance with Pacifica Municipal Code, Section 4-12.11
1. The Tree Protection Zone (TPZ) should be defined with protective fencing. This should be cyclone or chain link fencing on 11
/2” or 2” posts driven at least 2 feet into the ground standing at least 6 feet tall.
Normally a TPZ is defined by the dripline of the tree. This can be reduced to edge of proposed curb and edge of proposed construction as shown on the drawing in a thick red line in accordance with Type I Tree Protection as outlined and illustrated in image 2.15-1 and 2 (6) .
2. Any pruning and maintenance of the trees shall be carried out before construction begins. This should allow for any clearance requirements for both the new structure and any construction machinery. This will eliminate the possibility of damage during construction. The pruning should be carried out by an arborist, not by construction personnel. No limbs greater than 4” in diameter shall be removed.
Tree # 4 will require the removal of one large (greater than 4” in diameter) main scaffold limb back to the trunk to accommodate the new construction. This should be done prior to construction. The pruning should be carried out by an arborist, not by construction personnel.
All trees that will be retained require some level of maintenance. The pruning should be carried out by an arborist, not by construction personnel prior to construction.
1.j
Packet Pg. 1191 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 18 | Page
3. Any excavation in ground where there is a potential to damage roots of 1” or more in diameter should be carefully hand dug. Where possible, roots should be dug around rather than cut.(2).
Any excavation within the TPZ should be done by hand under Arborist supervision.
Any excavation beneath the canopy of Tree # 3 should be done by hand, no roots greater than 2” in diameter should be cut. The pavement within the TPZ of Tree #3 should be constructed with permeable media such as pavers or gravel to enable percolation of water and oxygen to the root system.
Edge of curb should be no closer than 3 feet from face of the trunk of the tree, to prevent any damage to the base of the trunk of the tree
The proposed new parking spaces within the dripline of Tree # 4 should be constructed with permeable media such as pavers or gravel to enable percolation of water and oxygen to the root system.
The proposed area between the trunk of the tree and the proposed new building within the drip line of the tree should be constructed with permeable media such as pavers or gravel to enable percolation of water and oxygen to the root system.
Balcony footings within the TPZ of Tree # 4 should be piers where the first 2 feet of each pier within the TPZ should be located and hand dug to avoid any conflict with roots.
Tree #s 3 and 4 should be deep root fertilized with 600 gallons of 22 14 14 fertilizer prior to breaking ground to encourage healthy new root growth.
4. If roots are broken, every effort should be made to remove the damaged area and cut it back to its closest lateral root. A clean cut should be made with a saw or pruners. This will prevent any infection from damaged roots spreading throughout the root system and into the tree.(2)
5. Do Not:.(4)
a. Allow run off or spillage of damaging materials into the area below any tree canopy. b. Store materials, stockpile soil, park or drive vehicles within the TPZ of the tree. c. Cut, break, skin or bruise roots, branches or trunk without first obtaining permission from the city arborist.
d. Allow fires under any adjacent trees.
e. Discharge exhaust into foliage.
f. Secure cable, chain or rope to trees or shrubs.
g. Apply soil sterilants under pavement near existing trees.
6. Where roots are exposed, they should be kept covered with the native soil or four layers of wetted, untreated burlap. Roots will dry out and die if left exposed to the air for too long.(4)
1.j
Packet Pg. 1192 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 19 | Page
7. Route pipes into alternate locations to avoid conflict with roots.(4)
8. Where it is not possible to reroute pipes or trenches, the contractor is to bore beneath the dripline of the tree. The boring shall take place no less than 3 feet below the surface of the soil in order to avoid encountering “feeder” roots.(4)
9. Compaction of the soil within the dripline shall be kept to a minimum.(2) If access is required to go through the TPZ of a protected tree, the area within the TPZ should be protected from compaction either with steel plates or with 4” of wood chip overlaid with plywood.
10. Any damage due to construction activities shall be reported to the project arborist or city arborist within 6 hours so that remedial action can be taken.
11. Ensure upon completion of the project that the original ground level is restored.
Supplemental Irrigation
Supplemental irrigation should be provided for the trees that will remain during construction. This should consist of soaker hoses, or similar, laid beneath the canopies of the trees and covered with 4 inches of mulch. The soaker hoses should run for at least 8 hours, once a month during the warmer months.
1.j
Packet Pg. 1193 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 20 | Page
Glossary
Canopy The part of the crown composed of leaves and small twigs.(2) Dripline The width of the crown as measured by the lateral extent of the foliage.(1) Genus A classification of plants showing similar characteristics.
Species A Classification that identifies a particular plant.
Standard Height at which the girth of the tree is measured. Typically 4 1/2 feet above height ground level
References
(1) Matheny, N.P., and Clark, J.P. Evaluation of Hazard Trees in Urban Areas.
International Society of Arboriculture,1994.
(2) Harris, R.W., Matheny, N.P. and Clark, J.R.. Arboriculture: Integrated Management of Landscape Trees, Shrubs and Vines. Prentice Hall, 1999. (3) Carlson, Russell E. Paulownia on The Green: An Assessment of Tree Health and Structural Condition. Tree Tech Consulting, 1998.
(4) Extracted from a copy of Tree Protection guidelines. Anon (5) T. D. Sydnor, Arboricultural Glossary. School of Natural Resources, 2000 (6) D Dockter, Tree Technical Manual. City of Palo Alto, June, 2001
1.j
Packet Pg. 1194 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 21 | Page
Certification of Performance(3)
I, Robert Weatherill certify:
* That I have personally inspected the tree(s) and/or the property referred to in this report, and have stated my findings accurately. The extent of the evaluation and appraisal is stated in the attached report and the Terms and Conditions; * That I have no current or prospective interest in the vegetation or the property that is the subject of this report, and I have no personal interest or bias with respect to the parties involved;
* That the analysis, opinions and conclusions stated herein are my own, and are based on current scientific procedures and facts;
* That my compensation is not contingent upon the reporting of a predetermined conclusion that favors the cause of the client or any other party, nor upon the results of the assessment, the attainment of stipulated results, or the occurrence of any subsequent events;
* That my analysis, opinions, and conclusions were developed and this report has been prepared according to commonly accepted Arboricultural practices; * That no one provided significant professional assistance to the consultant, except as indicated within the report.
I further certify that I am a member of the International Society of Arboriculture and a Certified Arborist. I have been involved in the practice of arboriculture and the care and study of trees for over 20 years.
Signed
Robert Weatherill
Certified Arborist WE 1936a
Date: 8/3/24
1.j
Packet Pg. 1195 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 22 | Page
Terms and Conditions(3)
The following terms and conditions apply to all oral and written reports and correspondence pertaining to consultations, inspections and activities of Advanced Tree Care :
1. All property lines and ownership of property, trees, and landscape plants and fixtures are assumed to be accurate and reliable as presented and described to the consultant, either verbally or in writing. The consultant assumes no responsibility for verification of ownership or locations of property lines, or for results of any actions or recommendations based on inaccurate information.
2. It is assumed that any property referred to in any report or in conjunction with any services performed by Advanced Tree Care, is not in violation of any applicable codes, ordinances, statutes, or other governmental regulations, and that any titles and ownership to any property are assumed to be good and marketable. Any existing liens and encumbrances have been disregarded.
3. All reports and other correspondence are confidential, and are the property of Advanced Tree Care and it’s named clients and their assignees or agents. Possession of this report or a copy thereof does not imply any right of publication or use for any purpose, without the express permission of the consultant and the client to whom the report was issued. Loss, removal or alteration of any part of a report invalidates the entire appraisal/evaluation.
4. The scope of any report or other correspondence is limited to the trees and conditions specifically mentioned in those reports and correspondence. Advanced Tree Care and the consultant assume no liability for the failure of trees or parts of trees, either inspected or otherwise. The consultant assumes no responsibility to report on the condition of any tree or landscape feature not specifically requested by the named client.
5. All inspections are limited to visual examination of accessible parts, without dissection, excavation, probing, boring or other invasive procedures, unless otherwise noted in the report. No warrantee or guarantee is made, expressed or implied, that problems or deficiencies of the plants or the property will not occur in the future, from any cause. The consultant shall not be responsible for damages caused by any tree defects, and assumes no responsibility for the correction of defects or tree related problems.
6. The consultant shall not be required to provide further documentation, give testimony, be deposed, or attend court by reason of this appraisal/report unless subsequent contractual arrangements are made, including payment of additional fees for such services as described by the consultant or in the fee schedules or contract.
7. Advanced Tree Care has no warrantee, either expressed or implied, as to the suitability of the information contained in the reports for any purpose. It remains the responsibility of the client to determine applicability to his/her particular case.
8. Any report and the values, observations, and recommendations expressed therein represent the professional opinion of the consultants, and the fee for services is in no manner contingent upon the reporting of a specified value nor upon any particular finding to be reported.
9. Any photographs, diagrams, graphs, sketches, or other graphic material included in any report, being intended solely as visual aids, are not necessarily to scale and should not be construed as engineering reports or surveys, unless otherwise noted in the report. Any reproductions of graphs material or the work product of any other persons is intended solely for the purpose of clarification and ease of reference.
Inclusion of said information does not constitute a representation by Advanced Tree Care or the consultant as to the sufficiency or accuracy of that information.
1.j
Packet Pg. 1196 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Advanced Tree Care 540 and 570 Crespi Dr, Pacifica
965 East San Carlos Ave, San Carlos August 3, 2024
___________________________________________________________________________ 23 | Page
Addendum
Appraised Value of Tree # 3
1.j
Packet Pg. 1197 Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project Considerations) Line 9 Line 10 Line 11
Tree Tag #
Name (Initials)
WCISA Speces
Group
Classification
Booklet Page
Health
(Weighted
0.15)
Structure
(Weighted
0.70)
Form
(Weighted
0.15)
Overall
Condition
Rating (OCR)
"Weighted
Method"
Diameter
Inches at
4.5 ft. Above
Grade
Functional
Limitations
External
Limitations
WCISA
Species Group
Number Trunk Square
Inches for
ReplacementSize Specimen
of This
Average SF
Bay Area Cost
of 24 Inch Box
Tree (2019)
(UTC) Unit
Tree Cost per
Sq Inch (M
Divided by L)
Trunk Area
(TA) ((dia. x
dia.) x 0.785)
Basic
Functional
Replacement
Cost (BFRC) =
(OxN)
Depreciated
Functional
Replacement
Cost (DFRC) =
PxGxIxJ
Rounded-off
Appraised
Values
3 Cm 12 0.65 0.55 0.4 54% 39 90% 25% 2 2.24 $250.00 $111.61 1193.99 133,257.25 $ 16,266 $ $16,300 $16,300
Valuation Appraisal Worksheet Based on Guide for Plant Appraisal, 10th Edition, 2nd Printing (2019) "Functional Replacement Method / Trunk Formula Technique"Address: 570 Crespi Dr, PacificaDate: 8/3/24 Depreciation Factors
Advanced Tree Care and Consulting Inc.
965 East San Carlos Ave, San Carlos, CA 94070 650 839 9539 1 of 1
1.j
Packet Pg. 1198
Attachment: ATT I_Arborist Report 20240803_251202 (6098 : Crespi Drive Mixed Use Project
ATTACHMENT J
General Plan Policies Applicable to Project, 1980 and 2040 General Plans The Project is consistent with the following General Plan policies:
1980 General Plan
• Promote orderly growth in land uses and circulation (Circulation Element #15); • Land use and development shall protect and enhance the individual character of each neighborhood (Land Use Element #8);
• Prioritize in-fill residential development (Housing Element #4.D.i and 8.A); 2040 General Plan[1]
• ES-G-2: Maintain Fiscal Sustainability Foster a fiscally healthy City government and enlarge the City’s revenue base as necessary to sustain and support the community.
• ES-G-5: Attract New Businesses and Jobs. Seek out new businesses that will employ and serve Pacifica residents, improving the City’s jobs/housing ratio.
• ES-G-6: Ensure Environmental Protection. Ensure that economic development in Pacifica proceeds synergistically with environmental protection.
• ES-I-7: Mixed Land Uses. Promote development of a broader mix of revenue-generating land uses, including hotels, to increase the City’s fiscal benefits.
• ES-I-11: Development Pays its Fair Share. Continue to require new development to pay its fair share of needed community improvements. • ES-I-18 Public Realm Improvements. Invest in streetscape and public space improvements to attract visitor-oriented development and improve Pacifica’s image and the quality of life for residents. • ES-I-32: Investment in Infrastructure. Continue to invest in public infrastructure improvements, including landscaping, signage, lighting, undergrounding overhead utility lines, and roadways.
• ES-I-35: Preserve the Experience of the Natural Environment. Ensure that new development projects do not disrupt view corridors from prominent points or otherwise interfere with residents’ and visitors’ experience of Pacifica’s natural areas and amenities.
1.k
Packet Pg. 1199 Attachment: ATT J_General Plan Policies_1980+2040 General Plans (6098 : Crespi Drive Mixed Use Project Considerations) • ES-I-36: Appropriate Site Design. Ensure that development projects adjacent to protected natural areas are designed to minimize impacts on those areas by employing low impact development techniques for stormwater management, using native/non-invasive landscaping, and minimizing nighttime lighting and glare.
• CD-G-2: Distinct Activity Centers. Create primary activity centers, each distinguished through land use, built form, public realm enhancements, and signage.
• CD-G-4: Enhanced Mixed Use Areas. Create distinctive mixed-use areas by ensuring good building form and building-sidewalk interface, and providing pedestrian-oriented streets and public spaces.
• CD-I-1 Primary Activity Centers: Create primary activity centers at West Sharp Park, Rockaway Beach, and Linda Mar, and neighborhood centers in Pacific Manor and Park Pacifica (at and around the Park Mall site). • CD-I-4: Support Infill and Redevelopment. Support compatible residential infill on designated vacant lots as shown in Figure 4-3, and redevelopment of underutilized commercial properties, and continue to use the City’s Design Guidelines in evaluation of proposals that don’t meet all development standards in residential districts.
• CD-I-5: High-Quality Multi-Family and Senior Housing for All Income Levels. Support attached, multi-family, and senior housing that relates positively to the street and surrounding areas, is accessible on foot to community amenities including transit, shopping and services, and offers residents a range of amenities, and provide updated, illustrated Design Guidelines that reflect the unique qualities of Pacifica’s neighborhoods.
Larger buildings should vary in form, setback, height, color, and materials.
Land scaping plays a role in defining spaces, creating interplay with building forms, and screening parking and utilities. Access and parking should be designed to minimize traffic impacts on residential streets. Buildings and open spaces should be oriented to maximize sunlight.
• CD-I-7: Commercial and Mixed Use Building Form. Seek to ensure that new commercial and mixed use development creates an attractive and human-scaled built environment. Update the Zoning Ordinance and Design Guidelines to address mixed use access, building form, the building sidewalk relationship.
Buildings should be varied to provide visual interest, while having a unified theme within each project.
Building form should be responsive to context, including stepping down to adjacent, lower-scale uses, and establishing a fine-grained scale at street level.
1.k
Packet Pg. 1200 Attachment: ATT J_General Plan Policies_1980+2040 General Plans (6098 : Crespi Drive Mixed Use Project Considerations) Commercial buildings and ground-floor commercial uses in mixed-use areas should have active frontages characterized by building windows and entrances supporting activity on the sidewalk. Illustrated Design Guidelines should show how a fine grain of development offers more opportunities for public spaces, greater visual interest at the street level, a feeling of safety, and a diverse character reflective of Pacifica’s unique and historic neighborhoods. Chapter 4: Land Use discusses the need to update the Zoning Ordinance to create new zoning districts and provide development standards
• LU-G-2: Concentrated Development. Focus new development in or directly adjacent to already-developed areas, where it can be served by existing public services and where it will not have significant impacts on coastal or other resources.
• LU-G-3: Future Residential Development. Limit development to sites that are not critical for open space connections or habitat preservation, and which will be in harmony with the surrounding natural setting. • LU-G-4: Higher-Density Housing. Locate higher-density housing outside of Coastal Vulnerability Zones and in accessible places close to community shopping areas and transportation.
• LU-G-6: Compact Mixed Use Development. Facilitate compact mixed-use development on sites with good access to transit consistent with the Land Use Diagram. Mixed use development may include housing or office space with retail, restaurants, or personal service businesses. • LU-G-7: Open Space Conservation and Habitat Protection. Protect beaches, oceanfront bluffs, ridgelines, hillside areas adjacent to existing open space, and areas that support critical wildlife habitat and special status species.
• LU-I-38 Lower Crespi Drive. Establish zoning provisions to facilitate compact, mixed-use redevelopment of older commercial and residential properties along lower Crespi Drive, consistent with the Mixed Use Center and Mixed Use Neighborhood designations as shown in the Land Use Diagram.
• OC-I-21 Development Strategies to Preserve Open Space: Continue to promote density-open space trade-offs, such as clustering development, transferring development rights from sensitive to less sensitive land, and dedication or protection of open space through covenants or consecutive easements;
• CO-I-4: Wetlands Preservation. Prohibit new development in existing wetlands except as allowed under the federal Clean Water Act and the California Coastal Act. Continue to require formal delineations wetlands
1.k
Packet Pg. 1201 Attachment: ATT J_General Plan Policies_1980+2040 General Plans (6098 : Crespi Drive Mixed Use Project Considerations) subject to State or federal regulations prior to any proposed development project in an area where potential wetlands have been identified. If impacts on wetlands are unavoidable, compensation measure should be in line with the State’s no-net-loss goal regarding wetlands.
• CO-I-14: Minimize Site Disturbance. Require use of best practices during development design and construction to preserve natural resources, such as soil, trees, native plants, and permeable surfaces.
• HE-G-1. Maintain, Improve, and Develop Housing: Encourage the development and retention of housing in a variety of types for all income levels with priority given to low-income households and projects that foster sustainable urban development.
• HE-P-7 Expand affordable rental and homeownership housing choices in areas of opportunity and higher homeownership among resources and promote communities that are opportunities for disproportionately underrepresented in homeownership to foster intergenerational wealth. [1] Economic Sustainability Element (ES); Community Design (CD) Element; Land Use Element (LU); Circulation Element CI); Open Space and Community Uses Element (OC); Conservation Element (CO); 2023-2031 Housing Element (HE)
1.k
Packet Pg. 1202 Attachment: ATT J_General Plan Policies_1980+2040 General Plans (6098 : Crespi Drive Mixed Use Project Considerations) 4910-1683-6220 v1
ATTACHMENT K
RESOLUTION NO. xx-2025
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PACIFICA APPROVING
AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT FOR
PURCHASE AND SALE (INCLUDING JOINT ESCROW INSTRUCTIONS) AND
TERMS OF DEVELOPMENT WITH BREAKWATER CRESPI, LLC FOR A PORTION OF THE CITY’S PROPERTY LOCATED AT 540 CRESPI DRIVE IN THE CITY OF
PACIFICA
WHEREAS, City owns that certain real property located at 540 Crespi Drive in the City of Pacifica, identified as Assessor’s Parcel Number 022-162-420 (“Greater Parcel”); and
WHEREAS, Breakwater Crespi, LLC (“Buyer”) has submitted a proposal to City to purchase the eastern 55 feet of the Greater Parcel (the “Property”), which abuts property owned by Buyer at 570 Crespi Drive (“”Buyer Property”) and obtain land use entitlements to develop and construct 19 residential units, including three affordable units, and approximately 3,100 square feet of commercial space on the Property and the Buyer Property (“Project”); and
WHEREAS, in order to comply with the Surplus Land Act (Government Code Section 54220 et seq.) (“SLA”), on May 22, 2023, the City Council adopted Resolution No. 49-2023, declaring the Property as surplus property; and WHEREAS, the City issued a Notice of Availability of the Property pursuant to the SLA, on June 27, 2023, and received no responses within the 60-day response period and can now transfer the Property to Buyer; and
WHEREAS, the City Council held a duly noticed hearing on the Project at a special meeting of the City Council on December 2, 2025 and adopted Resolution No. xx-2025 certifying the Final EIR and adopting the CEQA Findings, a Statement of Overriding Considerations, and Mitigation and Monitoring Program for the Project; and WHEREAS, at its meeting on December 2, 2025, the City Council also adopted various resolutions and ordinances to approve the land use and project entitlements for the Project.
NOW, THEREFORE, BE IT RESOLVED THAT by the City Council of the City of Pacifica as follows:
Section 1. Recitals. The City Council does hereby find, determine and resolve that all of the foregoing recitals are true and correct.
Section 2. CEQA Findings. The City Council does hereby find the sale of the Property to effectuate construction of the Project is covered under the certified EIR.
1.l
Packet Pg. 1203 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 4910-1683-6220 v1
Section 3. Approval and Authorization. The City Council does hereby resolve, order and/or direct as follows:
a. The Agreement, substantially in the form attached hereto as Exhibit A and incorporated herein, by this reference, is hereby approved. b. The City Manager is hereby delegated authority to and is authorized and directed to execute the Agreement substantially in the form attached hereto as Exhibit A, subject to minor or technical changes approved by the City Manager and City Attorney.
c. The City Manager or their designee is authorized and directed to execute such additional instruments and to take such actions as necessary to carry out the intent of this Resolution and the Agreement, including executing a Grant Deed to transfer the Property.
Section 4. Effective Date. This Resolution shall take effect immediately upon adoption.
* * * * * * * *
PASSED AND ADOPTED at a special meeting of the City Council of the City of Pacifica, California, held on the 2nd of December.
AYES, Council Members:
NOES, Council Members:
ABSENT, Council Members:
ABSTAIN, Council Members:
_____________________________
Sue Beckmeyer, Mayor
ATTEST: APPROVED AS TO FORM:
______________________________ _____________________________ Sarah Coffey, Michelle Kenyon, City Attorney
City Clerk
1.l
Packet Pg. 1204 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 4910
-1683-6220 v1
EXHIBIT A
PURCHASE AND SALE AGREEMENT
1.l
Packet Pg. 1205 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 1 AGREEMENT FOR PURCHASE AND SALE
(INCLUDING JOINT ESCROW INSTRUCTIONS) AND
TERMS OF DEVELOPMENT
This Agreement for Purchase and Sale (Including Joint Escrow Instructions) and Terms of Development (“Agreement”), dated as of _______________, (“Effective Date”), is between the CITY OF PACIFICA, a California municipal corporation (“Seller” or “City”), and BREAKWATER CRESPI, LLC, a California limited liability company (“Buyer”).
R E C I T A L S
A. Seller is the owner of that certain real property consisting of that certain portion of the Community Center property located at 540 Crespi Drive in the City of Pacifica, identified as Assessor’s Parcel Number 022-162-420, as more particularly described and depicted on Exhibit A, attached hereto and incorporated herein by this reference (“Property”). The Property consists of the eastern 55 feet of the greater parcel owned by Seller and abuts property owned by Buyer at 570 Crespi Drive (“Buyer Property”).
B. Buyer has submitted a proposal to Seller to acquire the Property from Seller and obtain land use entitlements to develop and construct 19 residential units, including three affordable units, and approximately 3,100 square feet of commercial space on the Property and the Buyer Property (“Project”).
C. On November 3, 2025, the Planning Commission of the City of Pacifica conducted a review pursuant to Government Code Section 65402 and determined that Seller’s disposition of the Property to Buyer pursuant to the terms hereof is consistent with, and will facilitate implementation of the City of Pacifica General Plan, as adopted by Planning Commission Resolution No. .
D. Pursuant to the California Environmental Quality Act (“CEQA”) (Public Resources Code section 21000 et seq.), an Environmental Impact Report (“EIR”) for the Project has been prepared.
E. On _______________, the City Council of the City of Pacifica (“City Council”) considered and by Resolution No. _________ approved Seller entering into this Agreement.
F. The EIR, the Development Agreement, this Agreement, and related approvals were all considered and approved and adopted by the City Council on _________.
A G R E E M E N T
1. Purchase and Sale of Property.
1.1 Incorporation of Recitals. The recitals set forth above are incorporated herein by this reference.
1.l
Packet Pg. 1206 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 2 1.2 Sale. Seller agrees to sell to Buyer, and Buyer agrees to purchase from Seller, on the terms and conditions set forth herein, the Property together with any and all rights, privileges and easements appurtenant thereto owned by Seller.
1.3 Purchase Price. The purchase price for the Property is Seven Hundred Fifty Thousand Dollars ($750,000.00) (“Purchase Price”). The Purchase Price shall be paid to Seller at Closing, as defined in Section 6.2, in immediately available funds.
1.4 Requirements to Develop the Project.
a. Buyer intends to develop the Project on the Property and has concurrently obtained the following land use entitlements from Seller, as City of Pacifica: General Plan Amendment (GPA-096-19), Rezoning (RZ-194-16), Zoning Text Amendment (TA-116-19), Development Agreement (DA-4-21), Site Development Permit (PSD-811-16), Use Permit (UP076-16), Parking Exception (PE-183-19), Sign Permit (S-129-19), and Tentative Subdivision (SUB-233-16).
b. Buyer agrees and acknowledges that it will be required to execute and record the approved Development Agreement, which will grant Buyer vested rights and set forth the obligations of Buyer to develop the Project (“Development Agreement”). The terms of the Development Agreement are hereby incorporated by reference in this Agreement. c. Buyer shall obtain a building permit to construct the Project prior to Closing.
1.5 Good Faith Deposits.
a. Within three business days of escrow being opened as set forth in Section
6.1 of this Agreement, Buyer shall deliver into escrow a good faith deposit in the amount of Seventy Five Thousand Dollars ($75,000.00) (“Good Faith Deposit”). The Good Faith Deposit shall serve as security for the performance of Buyer’s obligations under this Agreement, shall be applied towards the Purchase Price at Closing and is fully refundable to Buyer prior to the expiration of the Due Diligence Period (see Section 3.3). After the Due Diligence Period, the Good Faith Deposit shall be nonrefundable and shall constitute liquidated damages to Seller in the event the purchase and sale is not completed as provided herein.
After the expiration of the Buyer’s Due Diligence Period and Buyer’s acceptance of the condition of the Property, as set forth in Section 3.3, the Good Faith Deposit may only be returned to Buyer if all Buyer’s Conditions Precedent to Conveyance, as set forth in 2.1 have not been satisfied or waived by Buyer, or Seller is in default under this Agreement following notice and expiration of applicable cure periods.
Buyer acknowledges that the construction of the Project on the Property is a material consideration to Seller.
IN THE EVENT BUYER DEFAULTS IN BUYER’S OBLIGATION TO
SATISFY ALL CONDITIONS PRECEDENT AND PURCHASE THE
PROPERTY WITHIN THE TIME AND IN THE MANNER SPECIFIED IN
1.l
Packet Pg. 1207 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 3 THIS AGREEMENT, AND SELLER IS READY, WILLING AND ABLE TO
CLOSE THIS TRANSACTION, SELLER SHALL BE RELEASED FROM ALL
OBLIGATIONS AT LAW OR IN EQUITY TO CONVEY THE PROPERTY TO BUYER. BUYER AND SELLER AGREE THAT IT WOULD BE
IMPRACTICAL AND EXTREMELY DIFFICULT TO ESTIMATE THE
AMOUNT OF DAMAGES SUFFERED BY SELLER BECAUSE OF SUCH
DEFAULT; THAT THE GOOD FAITH DEPOSITS DEPOSITED INTO
ESCROW BY BUYER CONSTITUTE A REASONABLE ESTIMATE AND
AGREED STIPULATION OF SUCH DAMAGES; THAT SELLER SHALL
RETAIN SUCH SUM AS LIQUIDATED DAMAGES AS ITS SOLE AND
EXCLUSIVE REMEDY IN THE EVENT OF BUYER’S DEFAULT, WAIVING
ANY RIGHT TO SPECIFIC PERFORMANCE OR ANY OTHER REMEDY AT LAW OR IN EQUITY.
____________________ ______________________
Seller’s Initials Buyer Initials
If this Agreement is not cancelled or terminated, as provided herein, or the Good Faith Deposits are not retained by Seller as liquidated damages, the Good Faith Deposits shall be credited against the Purchase Price at Closing.
2. Conditions.
2.1 Buyer’s Conditions Precedent to Conveyance. Buyer’s obligation to purchase the Property is conditioned upon the following:
a. All of the representations and warranties made by Seller to Buyer pursuant to this Agreement shall be true and correct in all material respects as of the Closing date, as if made on such date.
b. Pursuant to Section 3.3, Buyer shall have completed its due diligence within the Due Diligence Period and provided written notice to Seller that all aspects of the Property are acceptable to Buyer.
c. Seller shall have delivered each of the documents described in 6.3(a), prior to the Closing date.
d. Title Company (as defined in 6.1) shall have issued an irrevocable and unconditional commitment to issue the Title Policy (as defined in 4.3) upon recordation of the Grant Deed (as defined in 4.1).
e. Seller shall not be in material default of any of its obligations under this Agreement following notice and expiration of any applicable cure period. f. Seller shall have completed the Lot Line Adjustment as set forth in Section 6.3(a)(iv) below.
1.l
Packet Pg. 1208 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 4 g. There shall not have occurred any material change with respect to the Property.
The conditions precedent to conveyance set forth in this 2.1 (“Buyer’s Conditions Precedent to Conveyance”) are solely for the benefit of Buyer and may be waived only by Buyer. No such waiver shall be binding upon Buyer unless made in writing by an authorized representative of Buyer.
2.2 Seller’s Conditions Precedent to Conveyance. Seller’s obligation to sell the Property is conditioned upon the following:
a. All of the representations and warranties made by Buyer to Seller pursuant to this Agreement shall be true and correct in all material respects as of the Closing date, as if made on such date.
b. Buyer shall have delivered the Good Faith Deposits, as required by Section 1.5.
c. Buyer shall have delivered each of the items described in 6.3(b) prior to the Closing date, and shall have performed all of its obligations under this Agreement in accordance with the provisions hereof.
d. Buyer shall have entered into the Development Agreement and the Development Agreement shall be recorded against the Property. e. Buyer shall have obtained building permits and be prepared to construct the Project immediately upon close of escrow.
f. Buyer shall not be in material default of any of its obligations under this Agreement following notice and expiration of any applicable cure period.
The conditions precedent to conveyance set forth in this Section 2.2 (“Seller’s Conditions Precedent to Conveyance”) are solely for the benefit of Seller and may be waived only by Seller. No such waiver shall be binding upon Seller unless made in writing by an authorized representative of Seller.
3. Representations and Warranties, Buyer’s Due Diligence, and Disclaimers and Releases.
3.1 Representations and Warranties of Seller. Seller hereby makes the following representations and warranties.
a. Seller, as of the Effective Date, owns fee simple title to the Property. b. There is no litigation, action, suit, arbitration, claims proceeding or governmental investigation in law or equity pending or, to Seller’s actual knowledge, threatened, with respect to the Property or against Seller which would prevent Seller from performing its obligations hereunder, or which would have a material adverse effect on the Property or Buyer.
1.l
Packet Pg. 1209 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 5 c. To the best of Seller’s knowledge, Seller’s execution, delivery and performance of its obligations under this Agreement will not constitute a default or a breach under any contract, agreement or order to which Seller is a party or by which it is bound. d. Seller shall maintain the Property until Closing in a manner generally consistent with the manner in which Seller has maintained the Property prior to the date of this Agreement.
e. Prior to Closing, Seller will not violate or modify, orally or in writing, any lease, contract, understanding or any other agreements, or create any new leases or other agreements affecting the Property, without Buyer’s written approval. f. To the best of Seller’s knowledge, no person, except as disclosed by this Agreement or otherwise in writing to Buyer, has any right to possession of the Property. There exist no oral or written leases or rental agreements affecting all or any portion of the Property. g. Seller will convey fee simple title to Buyer subject only to the Permitted Exceptions, as defined in 4.2 below. Seller agrees not to create any new title exceptions following the Effective Date unless Buyer’s written approval of such new exception(s) is first obtained.
h. To the best of Seller’s knowledge, there is no change contemplated in any applicable City laws which would prevent, limit, or impede Buyer’s contemplated use of the Property.
i. All references herein to “Seller’s knowledge” means the current, actual knowledge of City’s City Manager or his or her designee (“Seller’s Representative”), without any obligation of inquiry, and such term shall not include the knowledge of any other person or firm, it being understood by Buyer that (a) Seller’s Representative is not charged with knowledge of any of the acts or omissions of predecessors in title to the Property or the management of the Property before Seller’s acquisition of the Property, and (b) Seller’s current actual knowledge shall not apply to, or be construed to include, information or material which may be in the possession of Seller generally or incidentally, but of which Seller’s Representative is not actually aware.
j. Each of the representations and warranties of Seller contained in this 3.1 is true as of the Effective Date, and shall be deemed remade by Seller and shall be true as of the Closing date.
3.2 Representations and Warranties of Buyer. Buyer represents and warrants to Seller as follows:
a. Buyer is a limited liability company organized under the laws of the State of California. Buyer has full right, power and lawful authority to undertake all obligations of Buyer as provided herein and the execution, performance and delivery of this Agreement by Buyer has been fully authorized by all requisite actions on the part of the Buyer, which have been provided to City for review.
1.l
Packet Pg. 1210 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 6 b. To the best of Buyer’s knowledge, Buyer’s execution, delivery and performance of its obligations under this Agreement will not constitute a default or a breach under any contract, agreement or order to which Buyer is a party or by which it is bound. c. Buyer is not the subject of any bankruptcy proceeding. d. There are no actions, suits, material claims, legal proceedings, or any other proceedings affecting Buyer that would affect its authority to enter into and undertake all obligations under this Agreement.
Each of the representations and warranties of Buyer contained in this 3.2 is true as of the Effective Date, and shall be deemed remade by Buyer and shall be true as of the date of Closing.
3.3 Buyer’s Due Diligence. Within 90 calendar days following the Effective Date (“Due Diligence Period”), Buyer shall have reviewed, inspected and investigated, at its expense, the Property, either independently or through agents of Buyer’s choosing, including, but not limited to, the following:
a. The size and dimensions of the Property.
b. The availability and adequacy of water, sewage, fire protection, and any utilities serving the Property.
c. All matters relating to title, including extent and conditions of title to the Property, taxes, assessments, and liens.
d. All legal and governmental laws, statutes, rules, regulations, ordinances, and restrictions or requirements concerning the use and development of the Property including zoning, use permit requirements and building codes.
e. Natural hazards, including flood plain issues, currently or potentially concerning or affecting the Property.
f. The physical, legal, economic and environmental condition and aspects of the Property, and all other matters concerning the conditions, use, sale or development of the Property, including any permits, licenses, engineers’ reports and studies and similar information relating to the Property. Such examination of the condition of the Property may include examinations for the presence or absence of Hazardous Materials, as defined below, as Buyer deems necessary or desirable. The term “Hazardous Materials” means any and all substances, contaminants, chemicals, wastes, sewage, materials or emissions which are now or hereafter regulated, controlled, prohibited or otherwise affected by any present or future local, state or federal statute, ordinance, code, rule, regulation, order, decree, permit or other law now or hereafter in effect, including but not limited to (i) asbestos (including asbestos-containing materials); (ii) flammable, explosive, infectious, carcinogenic, mutagenic, or radioactive materials; (iii) petroleum or any substance containing or consisting of petroleum hydrocarbons (including gasoline, diesel fuel, motor oil, waste oil, grease or any other fraction of crude oil); (iv) paints and solvents; (v) lead; (vi) cyanide; (vii) DDT; (viii) printing inks; (ix) acids;
1.l
Packet Pg. 1211 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 7 (x) pesticides; (xi) ammonium compounds; (xii) polychlorinated biphenyls; (xiii) radon and radon gas; and (xiv) electromagnetic or magnetic materials, substances or emissions. g. Any easements and/or access rights affecting the Property. h. Any contracts and other documents or agreements affecting the Property. i. All other matters of material significance affecting the Property.
Within ten (10) business days of the Effective Date, Seller shall deliver or make available to Buyer copies of all governmental reports, notices, soils tests, environmental reports, plans, surveys, engineering reports, and any other material documents, information and data relative to the Property that are in Seller’s possession or under Seller’s control (“Seller Materials”).
Prior to expiration of the Due Diligence Period, Buyer shall provide written notice to Seller that (i) it has approved the physical, legal, economic and environmental condition and aspects of the Property, and all other matters concerning the legal status, condition, use, sale or development of the Property as set forth above in its sole and absolute discretion and intends to move forward with the purchase and development of the Property; or (ii) it desires to terminate the Agreement. If Buyer fails to notify Seller on or before the last day of the Due Diligence Period that Buyer has approved the Property as provided above, Buyer shall be deemed to have elected to terminate this Agreement. If Buyer terminates this Agreement as provided herein, the First Good Faith Deposit shall be returned to Buyer.
3.4 As-Is Conveyance.
BUYER SPECIFICALLY ACKNOWLEDGES AND AGREES THAT SELLER IS SELLING AND BUYER IS PURCHASING THE PROPERTY ON AN “AS IS WITH ALL FAULTS” BASIS, CONDITION AND STATE OF REPAIR INCLUSIVE OF ALL FAULTS
AND DEFECTS, WHETHER KNOWN OR UNKNOWN, AS MAY EXIST AS OF THE
CLOSING, INCLUDING THE ENVIRONMENTAL CONDITIONS DESCRIBED ABOVE (“AS IS CONDITION”) AND THAT, EXCEPT AS EXPRESSLY SET FORTH IN SECTION
3.1, ABOVE, BUYER IS NOT RELYING ON ANY REPRESENTATIONS OR WARRANTIES FROM SELLER OR ANY OF SELLER’S ELECTED OFFICIALS,
OFFICERS, AGENTS, EMPLOYEES, REPRESENTATIVES, ATTORNEYS OR BROKERS (COLLECTIVELY, “SELLER PARTIES”) AS TO ANY MATTERS CONCERNING THE PROPERTY.
3.5 Disclaimers. Buyer acknowledges and agrees that except as expressly set forth in this Agreement: (a) neither Seller, nor any Seller Party, has made any representations, warranties, or promises to Buyer, or to anyone acting for or on behalf of Buyer, concerning the condition of the Property or any other aspect of the Property; (b) the condition of the Property has been independently evaluated by Buyer prior to the Closing; and (c) any information, including Seller Materials, which Buyer has received or may hereafter receive from Seller or any Seller Party were and are furnished without warranty of any kind and on the express condition that Buyer has made its own independent verification of the accuracy, reliability and completeness of such information and that Buyer will not rely on any of the foregoing.
1.l
Packet Pg. 1212 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 8 3.6 Waivers and Releases. Buyer hereby releases Seller from any and all manner of rights, liabilities, claims, actions, causes of action, suits, proceedings, demands, damages, costs, expenses (including attorney’s fees and costs) or other compensation whatsoever, in law or equity, of whatever kind or nature, whether known or unknown, direct or indirect, foreseeable or unforeseeable, absolute or contingent that Buyer now has or may have or which may arise in the future arising out of, directly or indirectly, or in any way connected with (a) all warranties of whatever type or kind with respect to the physical or environmental condition of the Property, whether express, implied or otherwise, including those of fitness for a particular purpose or use; (b) use, management, ownership or operation of the Property; (c) the physical, environmental or other condition of the Property; (d) the application of, compliance with or failure to comply with any Applicable Laws as to the Property; (e) Hazardous Materials as to the Property; and (f) the As Is Condition (the foregoing are collectively referred to as “Claims”). By releasing and forever discharging the Claims, Buyer expressly waives any rights under California Civil Code Section 1542, which provides:
“A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS THAT THE
CREDITOR OR RELEASING PARTY DOES NOT KNOW OR SUSPECT TO
EXIST IN HIS OR HER FAVOR AT THE TIME OF EXECUTING THE
RELEASE AND THAT, IF KNOWN BY HIM OR HER, WOULD HAVE
MATERIALLY AFFECTED HIS OR HER SETTLEMENT WITH THE
DEBTOR OR RELEASED PARTY.”
INITIALS: CITY ______ BUYER _______
Notwithstanding the foregoing, the release and waiver of Claims set forth in this Section
3.6 shall not apply to any Claims arising from the sole active negligence or willful misconduct of Seller or from breaches by Seller of this Agreement (including but not limited to breaches of representations and warranties of Seller expressly set forth herein). The provisions of this Section 3.6 are a material portion of the consideration given by each party to the other in exchange for such party’s performance under this Agreement and shall survive the Closing.
4. Conveyance and Title.
4.1 Conveyance. At the Closing, Seller shall convey title to the Property to Buyer by grant deed in a form substantially similar to that attached hereto as Exhibit B (“Grant Deed”), free of any possession or right of possession by any person except that of Buyer and subject only to those exceptions approved by Buyer pursuant to Section 4.2 below.
4.2 Review and Approval of Condition of Title. Buyer has received a standard preliminary title report for the Property dated December 16, 2019, together with legible copies of the documents underlying the exceptions set forth in the preliminary title report. Buyer shall have the right to reasonably approve or disapprove all exceptions. Buyer hereby approves the following exceptions which shall be referred to herein as the “Pre-Approved Exceptions”: (a) the lien of any non-delinquent property taxes and assessments (which, if any exist, shall be
1.l
Packet Pg. 1213 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 9 prorated by the Title Company at Closing); and (b) easements and right-of-way exceptions numbers 4, 5, 6, and 11.
Within thirty (30) days after the Effective Date, Buyer shall give written notice to Seller of Buyer’s approval or disapproval of any of the title exceptions, except the Pre-Approved Exceptions. Buyer’s failure to give written disapproval of the exceptions within such time period shall be deemed Buyer’s disapproval of the exceptions. If Buyer delivers notice of disapproval of any exceptions, Seller shall have the right, but not the obligation, to cause any disapproved exceptions to be removed within thirty (30) days after receiving such notice of disapproval (or until five (5) business days prior to Closing, if earlier than the expiration of such thirty (30) day period) or provide assurances satisfactory to Buyer, in its sole discretion, that such exceptions will be removed on or before the Closing. Failure to notify Buyer within such thirty (30) day (or shorter) period shall be deemed Seller’s election not to remove the disapproved exceptions. Seller’s election or deemed election not to remove any disapproved exceptions shall not be a default under this Agreement. If Seller cannot or does not elect to remove any of the disapproved exceptions within such thirty (30) day (or shorter) period, Buyer shall have five (5) business days after the expiration of such thirty (30) day (or shorter) period to either give Seller notice that Buyer elects, in its sole discretion, to proceed with the Closing, subject to the disapproved exceptions, or to give Seller notice that Buyer elects to terminate this Agreement, in which case neither party will have any further rights or obligations under this Agreement other than those obligations which survive termination hereof. The Pre-Approved Exceptions and other exceptions to title approved by Buyer as provided herein are hereinafter referred to as the “Permitted Exceptions.” If any exceptions other than the Permitted Exceptions are reported by the Title Company after Buyer has approved the condition of title for the Property pursuant to the foregoing procedures, then any such new exception shall be subject to the same procedures for review and approval set forth above for the Permitted Exceptions.
4.3 Title Insurance. Concurrently with recordation of the Grant Deed, the Title Company shall issue to Buyer such policy of title insurance for the Property which at Buyer’s option may be an ALTA extended coverage owner’s policy (“Title Policy”) as may be required by Buyer, and/or Buyer’s lenders or other institutions that may be providing financing for the Project, together with such endorsements as are reasonably requested by Buyer and/or Buyer’s lenders or other institutions, insuring that Buyer has a valid fee ownership interest in the Property, subject only to the Permitted Exceptions and other encumbrances expressly contemplated by this Agreement to be recorded at Closing. The premium for the Title Policy, plus any additional costs, including the cost of surveys, and any endorsements requested by Buyer shall be paid by Buyer.
5. Brokers.
5.1 Brokers. Seller and Buyer each warrants and represents that it has not engaged the services of any agent, finder or broker in connection with the transaction which is the subject of this Agreement, and that it is not liable for any real estate commissions, broker's fees or finder's fees which may accrue by means of the sale of the Property. Seller and Buyer agree to and do hereby indemnify and hold the other harmless from and against any and all costs, liabilities, losses, damages, claims, causes of action or proceedings which may result from any broker, agent or finder, licensed or otherwise, which it has employed in connection with the
1.l
Packet Pg. 1214 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 10 transaction covered by this Agreement. The provisions of this 5.1 shall survive the Closing or other termination of this Agreement.
6. Closing and Escrow.
6.1 Escrow Instructions. Within ten (10) days following the Effective Date of this Agreement, the parties shall open escrow and deposit an executed counterpart of this Agreement with Kim Gilmore, North American Title Company, located at 711 Main Street, Half Moon Bay, California (“Title Company”), and this instrument shall serve as the instructions to the Title Company as the escrow holder for consummation of the purchase and sale contemplated hereby.
Seller and Buyer agree to execute such reasonable additional and supplementary escrow instructions as may be appropriate to enable the Title Company to comply with the terms of this Agreement; provided, however, that in the event of any conflict between the provisions of this Agreement and any supplementary escrow instructions, the terms of this Agreement shall control.
6.2 Closing. “Closing” means the consummation of the purchase and sale of the Property as described herein as evidenced by the performance by each party of its obligations hereunder, including the Title Company’s recordation and delivery of the Grant Deed, delivery of the documents as set forth in this Agreement, Title Company’s irrevocable and unconditional commitment to issue the Title Policy upon recordation of the Grant Deed, and the payment of the Purchase Price by Buyer. The Closing hereunder shall be held and delivery of all items to be made at the Closing under the terms of this Agreement shall be made at the offices of the Title Company on the date which is within ten calendar days of completion of all conditions precedent to conveyance as set forth above, but in no event later than December 31, 2026, as may be extended by the parties (“Outside Closing Date”).
6.3 Deposit of Documents.
a. At or before the Closing, Seller shall deposit into escrow the following items:
(i) Documentary transfer taxes and Seller’s customary share of the normal prorations;
(ii) Documentation of a credit towards the Purchase Price in the amount of the Good Faith Deposit;
(iii) the duly executed and acknowledged Grant Deed conveying the Property to Buyer;
(iv) a Lot Line Adjustment modifying the property lines so that the Property and Buyer Property constitute one legal parcel; (v) an executed affidavit pursuant to Section 1445(b)(2) of the Internal Revenue Code, and on which Buyer is entitled to rely, that Seller is not a “foreign person” within the meaning of Section 1445(f)(3) of the Internal Revenue Code; and
1.l
Packet Pg. 1215 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 11 (vi) an executed California 597-W Certificate.
b. At or before Closing, Buyer shall deposit into escrow the following items:
(i) an executed Preliminary Change of Ownership Report; and (ii) funds necessary to close this transaction, including the Purchase Price, adjusted by a credit towards the Purchase Price in the amount of the Good Faith Deposit, any normal prorations, the Title Policy premium, all escrow fees and recording charges, and all other closing costs.
c. Seller and Buyer shall each deposit such other instruments as are reasonably required by the Title Company or otherwise required to close the escrow and consummate the purchase and sale transaction in accordance with the terms hereof. Seller and Buyer hereby designate Title Company as the “Reporting Person” for the transaction pursuant to Section 6045(e) of the Internal Revenue Code and the regulations promulgated thereunder and agree to execute such documentation as is reasonably necessary to effectuate such designation. d. Buyer shall be solely responsible for paying the following costs associated with the transfer of the Property: (i) the premium for the Title Policy, including any endorsements; (ii) all escrow fees and recording charges, (iii) Buyer’s customary share of other normal prorations; (iv) all other closing costs; and (v) all of Buyer’s due diligence expenses.
Seller shall be solely responsible for paying the following costs associated with the transfer of the Property: (i) documentary transfer taxes and (ii) Seller’s customary share of normal prorations.
e. Ad valorem taxes and assessments levied, assessed or imposed on the Property for any period prior to the Closing, if any, shall be paid by Seller. Ad valorem taxes and assessments levied, assessed or imposed on the Property for the period after the Closing shall be paid by Buyer.
7. Default and Remedies.
7.1 General. The failure by any party to perform any obligation under this Agreement or the Development Agreement, if the failure has continued for a period of thirty (30) days after the other party demands in writing that the defaulting party cure the failure, shall be deemed a default hereunder. If, however, by its nature the failure cannot be cured within thirty (30) days, the defaulting party may have a longer period as is necessary to cure the failure, in any event not to exceed sixty (60) days, provided, however, such extended cure period shall be conditioned upon the defaulting party promptly commencing to cure within the thirty (30) day period and thereafter diligently completing the cure.
7.2 Remedies Upon Default. Upon the occurrence of an event of uncured default by Buyer, Seller, subject to the terms of this Agreement, shall be entitled to retain the Good Faith Deposits as liquidated damages.
a. Upon the occurrence of an event of uncured default by Seller, Buyer may either institute an action for specific performance or other equitable relief to compel sale of the
1.l
Packet Pg. 1216 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 12 Property to Buyer on the terms set forth herein or Buyer may opt to terminate this Agreement by written notice to Seller in which case the Good Faith Deposits previously deposited into escrow by Buyer shall be immediately returned to Buyer upon unilateral demand to the Title Company or by Seller, if such amounts have previously been released to Seller. b. Except as otherwise provided herein, neither party shall be entitled to any monetary damages, and each party hereby waives any and all rights to recover consequential or special damages arising directly or indirectly from a breach of this Agreement by the other party.
8. Miscellaneous.
8.1 Notices. Any notices required or permitted to be given hereunder shall be given in writing and shall be delivered (a) by certified mail, postage prepaid, return receipt requested, or (b) by a commercial overnight courier that guarantees next day delivery and provides a receipt, and such notices shall be addressed as follows:
To Seller: City of Pacifica
130 Avram Avenue
Pacifica, California 94608-3517
Attention: City Manager
With a copy to: Burke Williams & Sorensen, LLP
1999 Harrison Street, Suite 1650
Oakland, California 94612
Attention: Michelle Marchetta Kenyon
To Buyer: Breakwater Crespi, LLC
Attention: Eamon Murphy and Brendan Murphy
With a copy to:
To Title:
Brown, Gee & Wenger LLP
200 Pringle Avenue, Suite 400
Walnut Creek, California 94596
Attention: Michael K. Brown
North American Title Company
711 Main Street
Half Moon Bay, California 94019
Attention: Kim Gilmore
1.l
Packet Pg. 1217 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 13 or to such other address as either party may from time to time specify in writing to the other party. Any notice shall be effective only upon delivery or refusal to accept delivery by the intended recipient.
8.2 Assignments; Successors and Assigns. Neither party may assign its rights or obligations under this Agreement without the prior written consent of the other party, except that Buyer may assign its rights and obligations to an affiliate or subsidiary wholly controlled by Buyer. Subject to the provisions of this Section 8.2, this Agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns. No assignment shall release the assigning party from its obligations or liabilities hereunder accruing prior to the date of such assignment.
8.3 Right of Entry. Prior to the Effective Date, Seller has provided, and after the Effective Date shall continue to provide, Buyer with reasonable access to the Property and the records of Seller relating thereto. Without limiting the foregoing, prior to any entry to perform any invasive on-site testing, Buyer shall give Seller written notice thereof, including the identity of the company or persons who will perform such testing and the proposed scope of the testing.
Seller or its representative may be present to observe any testing (whether or not invasive) or other inspection performed on the Property. Buyer shall maintain, and shall assure that its contractors maintain public liability and property damage insurance in amounts and in form and substance adequate to insure against all liability of Buyer and its agents, employees or contractors, arising out of any entry or inspections of the Property pursuant to the provisions hereof, and Buyer shall provide Seller with evidence of such insurance coverage upon request by Seller. Buyer shall indemnify and hold Seller harmless from and against any costs, damages, liabilities, losses, expenses, liens or claims (including, without limitation, reasonable attorney’s fees), arising out of or relating to any entry on the Property by Buyer, its agents, employees or contractors in the course of performing the inspections, testings or inquiries provided for in this Agreement. Buyer agrees to keep the Property free from any liens arising out of any work performed, materials furnished or obligations incurred by or on behalf of Buyer or Buyer’s agents, employees or contractors with respect to any inspection or investigation of the Property.
If any such lien at any time shall be filed, Buyer shall cause the same to be discharged of record within ten (10) days thereafter by satisfying the same or, if Buyer, in its discretion and in good faith determines that such lien should be contested, by recording a bond or providing title insurance insuring over such lien. Failure by Buyer to discharge or bond over or provide title insurance over such lien shall be a material breach of this Agreement and Seller may terminate this Agreement and pursue such other rights and remedies against Buyer as may be available at law or in equity. Buyer’s indemnity obligations under this 8.3 shall survive the Closing or other termination of this Agreement.
8.4 Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of California without regard to its choice of laws rules.
8.5 Interpretation of Agreement. Each party has received independent legal advice from its attorneys with respect to the advisability of executing this Agreement and the meaning of the provisions hereof. The provisions of this Agreement shall be construed as to their fair meaning, and not for or against any party based upon any attribution to such party as the source of the language in question. The article, section and other headings of this Agreement are for
1.l
Packet Pg. 1218 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 14 convenience of reference only and shall not be construed to affect the meaning of any provision contained herein. Where the context so requires, the use of the singular shall include the plural and vice versa and the use of the masculine shall include the feminine and the neuter. The term “person” shall include any individual, partnership, joint venture, corporation, trust, unincorporated association, any other entity and any government or any department or agency thereof, whether acting in an individual, fiduciary or other capacity. The words “include” and “including” shall in all instances be interpreted as though followed by the words “without limitation.”
8.6 Amendments. This Agreement may be amended or modified only by a written instrument signed by Buyer and Seller and duly authorized by the City Council.
8.7 No Partnership. The relationship of the parties hereto is solely that of seller and buyer with respect to the Property and no joint venture, other partnership or agency relationship exists between the parties hereto. Neither party has any fiduciary relationship hereunder to the other.
8.8 No Third Party Beneficiary. The provisions of this Agreement are not intended to benefit any third parties.
8.9 Limitation of Liability. Buyer acknowledges and agrees that no member, official or employee of Seller shall be personally liable to Buyer, or any successor in interest, in the event of any default or breach by City, or for any amount which may become due to Buyer or its successors, or on any obligations under the terms of this Agreement.
8.10 Recordation; Actions to Clear Title. Prior to Closing, Buyer shall not record this Agreement, any memorandum of this Agreement, any assignment of this Agreement or any other document which would cause a cloud on the title to the Property. If Buyer fails to complete its purchase of the Property for any reason, or if this Agreement shall terminate for any reason not solely due to Seller’s default hereunder, then Buyer, at no cost to Seller, shall promptly execute, acknowledge and deliver to Seller, all within thirty (30) days after written request from Seller, a quitclaim deed, in recordable form, in favor of Seller, and any other documents requested by Seller to remove any cloud on title to the Property that may exist as the result of the existence of this Agreement or any escrow relating to this Agreement. In the event Buyer fails to so execute and deliver any such document, Buyer shall pay all losses, damages, costs and expenses, including, but not limited to, Seller’s reasonable attorneys’ fees, incurred in connection with Buyer’s breach of its obligations under this Section including interest, carrying costs associated with the Property from the date of Buyer’s failure to comply with this Section and costs of clearing any such cloud on title.
8.11 Severability. If any term, covenant, condition or provision of this Agreement, or the application thereof to any person or circumstance, to any extent shall be held by a court of competent jurisdiction to be invalid, void or unenforceable, the remainder of the terms, covenants, conditions or provisions of this Agreement, or the application thereof to any person or circumstance, shall remain in full force and effect and in no way shall be affected, impaired or invalidated thereby; except that if the court which determines the provision to be invalid also
1.l
Packet Pg. 1219 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 15 determines such provision to be of such materiality as to make enforcement of the remaining terms inequitable, then this Agreement shall terminate.
8.12 Waiver of Covenants, Conditions or Remedies. The waiver by one party of the performance of any covenant, condition or promise under this Agreement shall not invalidate this Agreement, nor shall it be considered a waiver by it of any other covenant, condition or promise under this Agreement. The waiver by either or both parties of the time for performing any act under this Agreement shall not constitute a waiver of the time for performing any other act or an identical act required to be performed at a later time. The exercise of any remedy provided in this Agreement shall not be a waiver of any consistent remedy provided by law, and the provision in this Agreement for any remedy shall not exclude other consistent remedies unless they are expressly excluded.
8.13 Termination. This Agreement may be terminated: (a) by Buyer, if prior to expiration of Buyer’s Due Diligence Period, Buyer elects not to proceed with purchase of the Property; (b) by Buyer, if prior to Closing, Buyer’s Conditions Precedent to Conveyance have not been satisfied or waived; (c) by Seller, if prior to Closing, Seller’s Conditions Precedent to Conveyance have not been satisfied or waived; or (d) if there is an uncured default, by written notice from the party not in default. The party wishing to terminate the Agreement must provide the other party with written notice of termination. In the event of termination by Seller due to Buyer’s failure to satisfy Seller’s Conditions Precedent to Closing or Buyer’s default, the Good Faith Deposits shall be retained by Seller as liquidated damages.
8.14 Time. Time is of the essence in the performance of each of the parties’ respective obligations contained herein.
8.15 Entire Agreement. This Agreement contains all representations, warranties and covenants made by Buyer and Seller and constitutes the entire understanding between the parties hereto with respect to the subject matter hereof.
8.16 Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original, but all of which taken together shall constitute one and the same instrument.
8.17 Exhibits. All exhibits to which reference is made in this Agreement are deemed incorporated in this Agreement.
8.18 Force Majeure. A force majeure event shall mean delay that a party could not reasonably have been expected to avoid and which by exercise of due diligence have been unable to overcome caused by: acts of God, war, fire, earthquake, windstorm, flood or other natural catastrophe, civil disturbance or disobedience, labor disputes, vandalism, sabotage, terrorism, or restraint by order of a court or administrative agency with jurisdiction. A party’s financial inability to perform or obtain financing or adverse economic conditions generally shall not be grounds for claiming a force majeure event.
[SIGNATURES ON FOLLOWING PAGE]
1.l
Packet Pg. 1220 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 16 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the Effective Date.
SELLER:
City of Pacifica
Dated: _______________ By:
Kevin Woodhouse, City Manager
ATTEST:
By:
Sarah Coffey, City Clerk
APPROVED AS TO FORM:
By:
Michelle Marchetta Kenyon, City Attorney
BUYER:
Breakwater Crespi, LLC, a California limited liability
company
Dated: _______________, 2025 By:
Name:
Its:
1.l
Packet Pg. 1221 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations)
EXHIBIT A
EXHIBIT A
LEGAL DESCRIPTION OF THE PROPERTY
[to be inserted]
1.l
Packet Pg. 1222 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) EXHIBIT B-1
EXHIBIT B
FORM OF GRANT DEED
RECORDING REQUESTED BY
______________ Title Insurance Company
AND WHEN RECORDED MAIL TO:
____________________________
____________________________
Attention: ___________________
(Space Above This Line for Recorder’s Use Only)
[Exempt from recording fee per Gov. Code § 27383]
GRANT DEED
For valuable consideration, the receipt of which is hereby acknowledged, CITY OF PACIFICA, a California municipal corporation (“Grantor”), hereby grants to , a (“Grantee”), all of Grantor’s right, title, and interest in the real property described in Attachment 1 attached hereto and incorporated herein (“Property”).
GRANTOR:
City of Pacifica
Dated: _______________ By: [FORM – DO NOT EXECUTE]
__________________, City Manager
[signature must be notarized]
ATTEST:
By:
___________________, City Clerk
APPROVED AS TO FORM:
By:
___________________, City Attorney
1.l
Packet Pg. 1223 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations)
ACKNOWLEDGMENT
ACKNOWLEDGMENT
State of California )
) ss
County of ___________ )
On , before me,___________________________________________, (Name of Notary)
notary public, personally appeared _________________________________________________ who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
(Notary Signature)
A notary public or other officer completing this
certificate verifies only the identity of the
individual who signed the document to which this
certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
1.l
Packet Pg. 1224 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) ATTACHMENT 1
- EXHIBIT B
ATTACHMENT 1 - EXHIBIT B
PROPERTY DESCRIPTION
[to be inserted prior to close of escrow]
1.l
Packet Pg. 1225 Attachment: ATT K_Draft Crespi Purchase and Sale Agreement Resolution+Agreement (6098 : Crespi Drive Mixed Use Project Considerations) 1 Updegrave, Samantha
From: Boles, Christine
Sent: Wednesday, November 12, 2025 2:56 PM
To: Coffey, Sarah
Cc: Bazzano, Denise; Woodhouse, Kevin
Subject: Crespi call up
Hi Sarah,
I'd like to officially request a councilmember call up of the Crespi development project that is currently scheduled to come before us on December 8.
Thank you!
Christine Boles
Vice Mayor
City of Pacifica
1.m
Packet Pg. 1226 Attachment: ATT L_2025-11-12_EMAIL_Council Call Up_570 Crespi (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: 570 Crespi wetland, PC meeting Oct 6
Date: Sunday, October 5, 2025 11:40:11 AM
[CAUTION: External Email]
Honorable Planning Commissioners,
For the sake of one or two condominiums, Pacifica may choose to sacrifice the last acre of Lake Mathilda, one of our two major wetlands. What’s left of Mathilda’s original 18 acres is now penned in on three sides by development. If the 570 project moves forward as is, there will be a retaining wall essentially butted up against the fourth side of this wetland, leaving no room for Mathilda to breathe, i.e., no buffer zone.
The buffer zone protects the integrity of a wetland. With no buffer zone Mathilda will likely disappear. While the general rule for wetlands is to leave a 50’ to 100’ buffer zone (see Pacifica’s own LCLUP), neither the stated owners (who don’t even own the property yet) nor the city (which does) acknowledge the necessity of any buffer zone.
A very small 17’ buffer zone can easily be realized by removing one condo - or much better, a 34’ buffer zone by removing two condos. A wider buffer allows for ground water rise due to sea level rise in the future.
It is irresponsible to plan for construction and base the disregard for a buffer on the presence or absence of endangered species. The reality is that during the WWEB construction ground water was being pumped. Pumping and construction virtually assured that for the two years of observation there would be no California Red Legged Frogs in the area. But there are limitations to basing decisions only on the presence or absence of endangered species.
The resident chorus frogs are not a threatened species, therefore no need to worry about their home, even if Mathilda disappears. This kind of reasoning is what has led to the disappearance of 95% of these very special wetland ecosystems in California.
Commissioners, please consider a small compromise that would give Mathilda a chance to survive. Remove one to two condos from the stated plan and include a buffer. Protecting what’s left of our historic ecosystems is at least as important as increasing the size of our city.
Thank you,
Stan Zeavin
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1227 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: 570 Crespi - PC Public Hearing October 6
Date: Saturday, October 4, 2025 1:28:51 PM
Attachments: Mathilde EIR commentmg 20250915.docx
[CAUTION: External Email]
Honorable Planning Commissioners,
What do you value about the history of Pacifica? What do you value about the environment of Pacifica? What do you consider to be your responsibility to preserve or protect either the environment or the history of our very unique town?
The value of wetlands was not understood in the 1900s or the 1950s or when the AT&T building and parking lots were built or even the Crespi Center. However, we now know how the many different kinds of wetlands function to benefit the entire healthy environment. There are now agencies that safeguard their health and work to preserve their essential functions. We can no longer claim ignorance.
Sadly, the City of Pacifica has ignored the essential functions of the Mathilde Wetland, excluding it from the General Plan definition of wetlands. Focused on creeks and beaches we, myself included, missed that exclusion. Now, it is not too late to reconsider the broader importance of wetlands to more than just species threatened with extinction.
The 570 project as presently configured will turn the Mathilde Wetland into a private backyard. The project will ERASE HISTORY and permit the death by a thousand cuts to this last remnant of the original 18 acre lagoon.
Your choice is to honor our history or erase it permanently.
Thank you for your consideration,
Margaret Goodale
48 year resident
San Pedro Valley
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1228 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Peter Loeb
To: Public Comment
Subject: comment re: 570 Crespi Drive
Date: Sunday, October 5, 2025 6:21:53 PM
[CAUTION: External Email]
To: Pacifica Planning Commission
Date: October 6, 2025
Re: Agenda item 1, 570 Crespi Drive, meeting of October 6, 2025 The 570 Crespi project should include a 50 foot setback from the wetland. To quote from the Green Foothills letter:
“The construction appears to lead directly up to the boundary of the emergent wetland with a wood deck and concrete pathway brushing the border. Pacifica’s LCLUP, recently approved by the California Coastal Commission in April of 2025, sets up an implementation guideline of a 100-foot buffer around environmentally sensitive habitats and wetlands, which is not to be reduced to less than 50 feet. While this location sits outside of the coastal zone, as a document that is meant to guide decisions the LCLUP gives the city a good set of baseline policies to follow throughout Pacifica. “Figure 3-13 from the Project Description provides a closeup depiction of what the boundaries will look like between the construction in the northern portion versus the wetlands in the southern part. The figure clearly depicts the wetland delineation line overlapping with Building C, and fails to incorporate an appropriate buffer in other locations of the project design. This would go against general practice that other cities take around their wetlands, and Pacifica’s own LCLUP. Buffer zones help mitigate issues around flooding that can be common when building around wetlands, something that infrastructure surrounding 570 Crespi Dr have already experienced.” [Emphasis added.] Looking at the site plan in the agenda packet, building construction clearly goes right up to, and into, the wetland delineation.
Not only is it a zero setback, it’s a minus zero setback. The building construction encroaches into the wetland.
Please include a 50 foot setback of the buildings from the wetland in the project design.
Peter Loeb
Maitland Road
Pacifica, CA 94044
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1229 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Peter Loeb
To: Public Comment
Subject: comment re: 540 Crespi Drive
Date: Sunday, October 5, 2025 6:21:59 PM
[CAUTION: External Email]
To: Pacifica Planning Commission
Re: Agenda Item 1, 540 Crespi Drive, meeting of October 6, 2025 Date: October 6, 2025
I don’t understand how the Pacifica Planning Commission can be considering approving an EIR and recommending a development agreement for a development on land that the applicant does not yet own and that the city of Pacifica is currently negotiating the price and terms of the sale of the land with the applicant. The city via its own Planning Commission is actively considering action on the EIR and the development agreement, while the price and payment terms of the sale of Pacifica city land to the developer are unknown at this time and the agreement is not finalized. This appears to be a conflict of interest – the Planning Commission is considering actions that can also affect the outcome of the negotiations for the sale of the land on which the development is proposed. It’s important that the Commission and the public know the purchase price and payment terms of the completed sale before they can consider the EIR and development agreement for development of the property.
The Pacifica Planning Commission is deliberating on a development while the sale of Pacifica city land for the development is still in process. The plan may need to be modified before it is final. The right way to do this - the horse before the cart - is to complete the sale of the land, then finalize the development plan and the approvals.
This is procedurally backwards. Complete the sale of the city land to the developer, then the city’s Planning Commission and City Council can deliberate about the EIR, rezoning, text amendment, and development agreement about that land that has been sold.
Peter Loeb
Maitland Road
Pacifica, CA 94044
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1230 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: 570 Crespi - Planning Commission - Oct. 6
Date: Monday, October 6, 2025 9:16:22 AM
[CAUTION: External Email]
Dear Commissioners,
Please postpone discussing approval of the 570 development until AFTER the unresolved issue of sale of the 540 Crespi public land parcel is completed. The public is entitled to know the worth of our public lands.
The second unresolved issue is that the project as currently presented for approval does not meet the accepted guidelines for wetland buffers.
Both these issues must be resolved BEFOR approval of this development can be validly discussed.
Thank you,
Margaret Goodale
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1231 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Claudia de Luna
To: Public Comment; [email protected]; [email protected]; Claudia de Luna Subject: One Small Change, A Wetland Saved (570 Crespi development) Date: Monday, October 6, 2025 10:39:18 AM
[CAUTION: External Email]
Honorable Planning Commissioners,
Pacifica risks destroying the last acre of Lake Mathilda, one of its two remaining major wetlands, for the sake of one or two condos. Of the original 18 acres, only a fragment remains, now surrounded on three sides by development. The 570 project would add a retaining wall along the fourth, leaving no buffer zone for this fragile ecosystem.
A buffer zone of 50–100 feet, as recommended in Pacifica’s own LCLUP, is essential to a wetland’s survival. By removing just one or two condos, a 17–34 foot buffer could be restored—enough to allow for sea-level rise and preserve habitat. It’s shortsighted to dismiss the buffer’s importance based solely on the temporary absence of endangered species.
Please consider this small compromise to give Mathilda a chance to survive. Protecting what remains of our historic wetlands is as vital as any new development.
Thank you,
Claudia de Luna
Pacifica Resident
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1232 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: 570 Crespi - PC - Oct 6
Date: Monday, October 6, 2025 10:39:39 AM
[CAUTION: External Email]
Honorable Planning Commissioners,
Is it true that the purchase price for the section of 540 Crespi to be incorporated into the 570 development is contingent on the prior approval of the old development plans? If it is, it looks suspiciously as if the developers are willing to negotiate the purchase price only after their original plans are approved.
At best tonight's meeting could be a waste of the city's time and money. At worst it seems that the owners of 570 Crespi are in control of this whole process. Something smells very fishy.
Please do not rule on any part of this issue before ownership of the 540 Crespi segment is decided and the price is made public!
Stan Zeavin
Pacifica
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1233 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Bill
To: Public Comment
Cc: stan zeavin
Subject: Crespi development
Date: Monday, October 6, 2025 10:39:56 AM
[CAUTION: External Email]
In behalf of the Pacifica Shorebird Alliance, I oppose the approval of the proposed 570 Crespi development unless reasonable buffers are included to protect the wetland.
A buffer zone between the development and wetlands is essential.
Bill Collins
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1234 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Cindy Abbott
To: Hauser, Samantha; Berman, Lauren; Davis, Marjory; Devine, Daniella; Ferguson, Alex; Godwin, James; Redfield, Chris
Cc: Public Comment
Subject: Planning Commission Meeting, Oct 6, Agenda #1 Protect and Restore the Historic Lake Mathilde Wetlands - Vote NO to Habitat Destruction
Date: Monday, October 6, 2025 11:55:04 AM
[CAUTION: External Email]
Dear Members of the Planning Commission,
Tonight you have the opportunity to protect and restore the last part of the historic Lake Mathilde Wetlands. What was a primary feature of the San Pedro Valley, has been impacted by generations of development.
One portion of this important wetland though remains, the south part of the lot at 570 (and 540) Crespi Drive.
Pacifica's General Plan 2040 clearly reflects the conflict between this project and Pacifica's own policies. The General Plan 2040 -- that several of you just approved and recommended to the Pacifica City Council to also approve -- includes the following:
CO-I-4: Wetland Preservation: Prohibit new development in existing wetlands except as allowed under the federal Clean Water Act and California Coastal Act.
CO-I-5: Limitations on Diking, Filling or Dredging: Only permit the diking, filling or dredging of... wetlands... where there is no feasible, less environmentally damaging alternative and where feasible mitigation measures have been provided to minimize adverse environmental effects.
CO-I-7: Maintain Functional Capacity of Wetlands: Ensure that any diking, filling or dredging in existing wetlands maintains or enhances their functional capacity.
The project description and drawings reflect the conflict and significant flaw in the project. The condominium units (part of the residential condominium buildout) do NOT leave the southern portion of the project "undisturbed" . There is NO required buffer between the wetlands delineation line and Building C or in other areas of the project design. This is in conflict with general practices in other municipalities, the Pacifica General Plan, AND the also recently approved LCLUP. (Note: We recognize this area is outside of the Coastal Zone, however with both the General Plan and LCLUP policies, the current project conflicts with overall guiding City of Pacifica planning documents.)
Over the years this development has been contemplated, the important wetlands remnant has already suffered from illegal grubbing.
Additionally, the project also removes trees without appropriate replacement and will impact the use of limited public parking spaces, and create traffic safety concerns in an area that is already prone to accidents.
Step back and consider the ramifications on the habitat, risk to the project when rains happen and it floods, and protect the history and preserve the Mathilde wetlands.
1.n
Packet Pg. 1235 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Thank you,
Cindy Abbott
West Sharp Park
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1236 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Cherie Chan
To: Public Comment
Subject: Agenda Item 1, 570 Crespi Appeal
Date: Monday, October 6, 2025 12:04:33 PM
Attachments: 0 AgendaItem11 Crespi 2022-06-27.pdf
SMCTA SRTS Audit Cabrillo ES Final.pdf
[CAUTION: External Email]
I write today in support of the appeal of Margaret Goodale, the original appellant. While I understand this application may have been pushed forward illegally and may be subject to a legal or procedural challenge, I am resubmitting my objections, again, along with additional information which demonstrates just how profoundly unsafe a new, highdensity project construction project will be in this area. If the hearing on this issue is held tonight to a future dates, please include these comments, along with their attachments in future packets.
The Report Lacks Data on School Safety
As it is, trucks parked on City land already illegally obstruct safe street crossings (see photo) and put the 600 children of Cabrillo School at risk daily as they attempt to walk and bike to school.
As a condition precedent, before extensive construction occurs, the street in front of and approaching the project must be made safe, as described in Map 3 of the attached Safe Routes to School Reports report, titled “SMCTA SRTS Audit Cabrillo ES_Final.pdf” Any construction must closely abide by, fund, and support the recommendations listed adjacent to the construction site. Otherwise, the builder and the City must be made liable for making an already unsafe situation where children are known to travel even more unsafe.
Biological Reports are Missing
I am reattaching the professional comments of Coastal Biologist Peter Baye and the list of Potential Endangered Species generated by US Fish and Wildlife Service at the project location, as these are missing from the record.
40% of this Property is City Land: No Less than 40% of the Units Must be Affordable.
From what I can tell, 40% of this property actually belonged to the City, but was sold to developers through closed-door interactions.
The availability and affordability of land for development has a significant impact on the supply of affordable housing. The aim of the Surplus Land Act (the "Act") is to increase the availability of real property in California for affordable housing development by requiring the prioritization of affordable housing when selling or leasing public lands no longer necessary for agency use. Government Code § 54220 et seq.
The statute addresses the shortage of sites available for affordable housing development as a matter of statewide concern." Anderson v. City of San Jose (2019) 42 Cal.App.5th 683, at 693. In recent years, the applicability and efficacy of the Act, originally enacted in 1968, has been addressed and adjusted through case law and legislative amendments.
Even if a non-profit developer was not interested in taking on this project, probably due to
1.n
Packet Pg. 1237 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) very real hydrological constraints,
In 2014, AB 2135 added Government Code Section 54222.5. Under this provision, when the local agency issues a notice of availability and an interested party responds to develop housing on the site for low- and moderate-income households, at least 25% of the proposed development must be income restricted for lower income households. This bill also added Section 54233, which requires that if the property is not successfully sold or leased during the defined 90-day negotiation process, the land is sold or leased outside of the scope of the Act, and at least 10 residential units are developed on the property, at least 15% of the units must be income restricted for lower income households. In 2019, the Sixth District Court of Appeal addressed the applicability of the Act, holding that the Act applies to both charter and general law cities. Anderson v. City of San Jose (2019).
While recognizing the municipal interest in disposing of surplus government property, the District Court concluded that "the well-documented shortage of sites for low- and moderate-income housing and the regional spillover effects of insufficient housing demonstrate 'extramunicipal concerns' justifying statewide application of the Act's affordable housing priorities.”
---------- Forwarded message ---------
From: Cherie Chan <[email protected]>
Date: Mon, Jun 27, 2022 at 2:56 AM
Subject: Public comment, June 27, 2022 Agenda Item 11, 570 Crespi Appeal To: Murdock, Christian <[email protected]>, _City Council Group <[email protected]>, Public Comment <[email protected]> Cc: Stan Zeavin <[email protected]>
(Hello! attachment 0, a PDF-formatted copy of this letter, is included here. Attachments 1-4 will be broken out in separate emails to comply with server size limits) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
Dear Council Members,
I am adding to the letter I submitted to the Planning Commission in support of Margaret Goodale’s appeal on May 9, 2022 at 2:43 PM, and bringing to your attention again for the record. I hope you will take the Appellant’s concerns and those of other concerned citizens seriously.
Summary of Prior Request
In that letter, I made two modest requests which would mitigate some of the already documented and well-known safety concerns at this intersection, and help alleviate a critical shortage of childcare services and youth-oriented recreational opportunities in Pacifica. 1)
Please conduct a detailed, accurate traffic study as it affects a very nearby school with simple recommendations for mitigation, as already submitted by the San Mateo County of Education.
2)
Disclosure of Public Land sales to private developers or an allocation for Affordable Housing consistent with Regional Housing Needs Assessment (RHNA) Affordability Requirements. (Minimum 40%).
Subsequent discussions from the minutes of that meeting support the ability of the City to enforce these suggestions; yet, the above suggestions are unfortunately, not included in the decision before you today.
1.n
Packet Pg. 1238 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1239 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1240 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1241 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Evidence of Biological Resources Must Be Considered
You will hear tonight from esteemed local naturalist and long-time Pacifican Margaret Goodale who has filed the appeal of this decision before you. I have very little to add in this regard[5], as she knows more about wetlands and its animals than I could ever absorb.
However, I did note that that the application has submitted new testimony after the Planning Commission Meeting.
[6] Here, the applicant attempts to introduce new evidence from a Madrone Ecological Consulting substantiating the applicant’s original “unconventional” report from Wood Biological Consulting. The consultant honestly and transparently shares that Madrone’s review was only with respect to the riser area in question: the Consultant “did not visit the site or take data of our own to determine the accuracy of the data in the field.”
I am attaching a memorandum from Dr. Peter Baye, a well-known Coastal biologist: we openly and notoriously wander the same paths in Pedro Point and Linda Mar, including this project site. In this memo, Dr. Baye has provided substantial evidence to “correct erroneous biological assessments on which the City of Pacifica may be relying for permit decisions regarding wetland impacts and endangered species.” Dr.
Baye provides substantial evidence that the project will have a significant effect on the environment.
As recently determined,[7] the “City [of Pacifica] solely relied on the developer’s experts who criticized Plaintiffs’ experts, which is insufficient. Without any specific findings of credibility by the City Council, Planning Commission or City staff, the City failed to meet its burden.”[8] Please send this project back to the Planning Commission for a proper review, detailed traffic studies and further consultation from the school and environmental community before proceeding with a sale of public lands and a new development project which will forever remove Pacifica’s last vestiges of Lake Mathilda and its surrounding wetlands.
Sincerely,
Cherie Chan
Resident on San Pedro Avenue, Parent at Cabrillo School Attachments:
This Letter in word format: 2022-06-27_AgendaItem11_Crespi 1_Pacifica Safe Routes to School Summary Report
2_BayeLetter
3_San Mateo County Superior Court CEQA Ruling for CPUP
4_Crespi-19-HomesSpeciesList
[1] See minutes of Planning Commission Meeting on page 447 of Agenda Packet: “Dep. Planning Director Murdock stated “that, if they look at the summary in the table at the beginning of the staff report and the analysis of the parking exception, they have not included those spaces and identified that the project would be short five off street parking spaces from its relevant number of required parking spaces. He stated that there are some additional nuances in terms of covered parking, etc., that make it not exactly “apples to apples” comparison. He stated that, in simple terms, the project would be short five spaces and it is short of Municipal Code requirements but the Commission may recall other mixed use projects that were approved in the past and quite often the parking exceptions requested for those projects are considerably higher and this developer has made an earnest effort to include as much onsite parking as they feel they can reasonably do."
[2] The “Traffic study” lacks site-specific details, and incorrectly cites the streets PM peak hours as between 4 and 6 pm. Any casual observer who spends a day at Fog City Java would note that peak hours are much earlier; unfortunately, Fog City Java closes at noon, because there is so little traffic during the report’s purported and
1.n
Packet Pg. 1242 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) unsupported peak times.
[3] Agenda Packet at page 449.
[4] Agenda Packet at page 446.
[5] Except for a list of Potential Endangered Species generated by US Fish and Wildlife Service at the project location, Attachment 4 of this letter.
[6] Agenda Packet Page 1165, Attachment K. It should be noted that the applicant’s own retained consultant characterized the prior expert hired by the same applicant’s approach as unconventional. [7]
San Mateo County Superior Court: Order on Plaintiffs / Petitioners Motion For Judgment On Writ Of Mandate Of First Cause Of Action Under CEQA. Coalition Of Pacificans For An Updated Plan et al, vs. City Council Of The City Of Pacifica et al. June 20, 2022.
[8] Id. At page 12, lines 6-9.
On Mon, May 9, 2022 at 2:43 PM Cherie Chan <[email protected]> wrote:
Re:
I am writing today in support of Margaret Goodale’s appeal of the proposed development of 19 new homes on 570 Crespi.
I am also a parent of two children at Cabrillo School, a second-grader and a Kindergartener. The proposed development is kitty-corner to Cabrillo School across Crespi Drive, which already faces severe traffic constraints. Any development approved by the City should include:
1. A detailed traffic study conducted by an independent consultant which builds upon existing studies and includes direct outreach to the entire school community. If this large development is allowed to move forward, traffic calming measures must be paid for by the developer. At a minimum, during the duration of construction, a traffic calming and safety mitigation plan must be utilized. In addition, Cabrillo parents should be granted temporary, 20-minute parking access or passes to alleviate the known parking shortage around Cabrillo School.
2. The sale of public land to private development interests without a substantial allocation for affordable housing units or a substantial space for child-friendly spaces be reconsidered, especially in light of the Child Care Crisis also affecting families in Southern Pacifica.
Traffic Calming
I chose to attend Cabrillo School because it is the school closest to my home, and envisioned biking to school most mornings. Unfortunately, I, like many other parents, have found that accessing Cabrillo school from the west is simply not safe.
In June 2012, Alta Planning + Design, with funds from the San Mateo County Office of Education, found that 77% of families drive their children to school by car, with only 7% walking, and 2% biking. The most frequently-cited reasons were 1) Unsafe Intersections, 2) Speeding Traffic Long Route, and 3) Too much traffic along the route.
The report can be accessed from the Pacifica School District Website as well as here:
https://sites.google.com/a/pacificasd.org/saferoutespacifica/home/cabrillo The report made several recommendations to improve the safety for families to reach their school.
Unfortunately, many of these recommendations have not been implemented. Specifically the report included a recommendation to “Take steps to establish the existing Community Center parking lot as a park-and-walk” at page 9-1. This could be accomplished at almost no cost, and reduce the dangerous conditions at Cabrillo School, particularly during pickup and drop-off. In addition, given the foreseeable construction-related delay which will be ongoing at this site, a paid crossing guard, paid by the developer, must be included during the very peak traffic times while construction is ongoing. Peak traffic times are 8 am to 8:30 every morning, and between 1pm and 1:30 Wednesday afternoons, when the entire school community enjoys its early-out days and children are playing in front of the school.
More recently, school administrators have also highlighted the insufficient parking around Cabrillo (see below). Adding this large development at an impacted intersection will only compound an already unsafe access problem.
1.n
Packet Pg. 1243 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1244 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1245 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1246 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
1 Dear Council Members,
I am adding to the letter I submitted to the Planning Commission I support of Margaret Goodale’s appeal on May 9, 2022 at 2:43 PM, and bringing to your attention again for the record. I hope you will take the Appellant’s concerns and those of other concerned citizens seriously.
Summary of Prior Request
In that letter, I made two modest requests which would mitigate some of the already documented and well‐known safety concerns at this intersection, and help alleviate a critical shortage of childcare services and youth‐oriented recreational opportunities in Pacifica. 1) Please conduct a detailed, accurate traffic study as it affects a very nearby school with simple recommendations for mitigation, as already submitted by the San Mateo County of Education. 2) Disclosure of Public Land sales to private developers or an allocation for Affordable Housing consistent with Regional Housing Needs Assessment (RHNA) Affordability Requirements. (Minimum 40%).
Subsequent discussions from the minutes of that meeting support the ability of the City to enforce these suggestions; yet, the above suggestions are unfortunately, not included in the decision before you today.
Standing: Why am I Writing?
As I indicated earlier, I walk, bike, or park near or past the proposed construction site 180 days per year, twice a day, to bring my two children, ages 6 and 8, to and from Cabrillo Elementary School, where I am also a frequent volunteer and PTO board member. I chose Cabrillo School because it is the only school within walking and biking distance, a critical measure of supporting Strong Towns.
The map below was included as part of a 2012 Pacifica Safe Routes to School Report prepared by Alta Planning + Design, sponsored by the San Mateo County Office of Education. It provides details of my family’s safest route to school, highlighted in orange in the photo below. The project in question is highlighted in lime green. On several occasions, my children or I have been nearly hit on this “safe route” due to the chaotic conditions at that intersection: the city is now contemplating the addition of 19 new housing units as well as a new 3, 000+ ft. business without first addressing the simple traffic mitigation steps recommended in the 2012 report.
1.n
Packet Pg. 1247 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
2 Even on the best of days traffic to and from school is unsafe, congested, and unmonitored, particularly at the intersection of Roberts and Crespi. As you can see from this recent photo below, (at the yellow circle, above, at the same corner as the proposed project) parents are already illegally parked in the Emergency Egresses in red and blocking the gate marked “Do Not Block”, because there is no available parking nearby and no safe place to stop.
1.n
Packet Pg. 1248 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
3 Figure 1 Photo Taken June 8th, 1:10 pm. Cars with nowhere to go have completely filled and blocked the Emergency Exit Adding 19 units with below‐requirement parking which has been appears to violate building code (see page 1222 of 1685 in your agenda packet: doors likely cannot open if cars are actually parked in the garage) will further exacerbate an already untenable parking shortage at my children’s’ school1 (and affect hundreds of other families) to maximize developer profits and wetlands degradation (see comments of Margaret Goodale and Dr. Peter Baye)
Please Adopt the Low‐Cost Reasonable Recommendations from the County’s Safe Routes to School Report at the Project Site as a Condition Precedent to the Start of Construction Please consider the safety needs of Pacifica families before you approve this new development without implementing the County’s safety suggestions. In my May letter, I included the County’s recommended safety proposals at the corner of Crespi and Roberts Road, as a link, but will also include it as an attachment, for the record.
This report, dated in 2012 spells out several safety concerns at the corner of Roberts and Crespi including two simple, low‐cost mitigations actions which the Planning Department Report that the Developer’s deficient traffic study2 fails to address. Specifically, the report highlights that a child had 1 See minutes of Planning Commission Meeting on page 447 of Agenda Packet: “Dep. Planning Director Murdock stated “that, if they look at the summary in the table at the beginning of the staff report and the analysis of the parking exception, they have not included those spaces and identified that the project would be short five off street parking spaces from its relevant number of required parking spaces. He stated that there are some additional nuances in terms of covered parking, etc., that make it not exactly “apples to apples” comparison. He stated that, in simple terms, the project would be short five spaces and it is short of Municipal Code requirements but the Commission may recall other mixed use projects that were approved in the past and quite often the parking exceptions requested for those projects are considerably higher and this developer has made an earnest effort to include as much onsite parking as they
feel they can reasonably do.
2 The “Traffic study” lacks site‐specific details, and incorrectly cites the streets PM peak hours as between 4 and 6 pm. Any casual observer who spends a day at Fog City Java would note that peak hours are much earlier;
1.n
Packet Pg. 1249 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
4 already been hit by a car at that very intersection (Report at page 17). Yet, the City fails to implement these very low‐cost improvements as suggested by the Safe Routes to School program ten years ago.
Some low‐cost mitigations bear repeating here, in hopes they are taken seriously this time.
At page 17 of this report, the County recommended a very low‐cost mitigation to stripe high‐visibility school zone crosswalks at the north and east legs of the Roberts Road/Crespi and remove the west leg of the intersection as shown in the photo below because the west side of the intersection is already known to be unsafe.
In addition, page 19 of the 2012 Safe Routes to School report includes a recommendation to “Take steps to establish the existing Community Center parking lot as a park‐and‐walk.” As I noted in my prior letter, allowing parents to park at the public Community Center lot, free of charge, for a limited duration to drop off and pick up their children safely would ease an already untenable parking shortage which will be exacerbated by the addition of this new development, particularly during the construction phases. The Planning Commissioners and Interim Developer had already noted that “the Community Center Lot is rarely full”3 perhaps because the public is required to pay a fee merely to drop off their children to school safely.
Granting Cabrillo families the temporary use of the city‐managed parking lot to drop off their children safely is a reasonable compromise to prevent the further endangerment of our community’s children which will be exacerbated with this new construction.
Sale of Public Lands for Private Gains
In the Planning Commission Minutes4 the Planning Commissioners ask about the sale of public lands for private gains. In response, our volunteer Commissioners were given the following vague answer:
Dep. Planning Director Murdock stated that he didn’t want to delve too deeply into the purchase and sale agreement as it isn’t subject to Planning Commission’s review, but there is a separate price that they city has negotiated for purchase of the land. The amount shown of $272,000 in the development agreement is separate from the purchase price for the city-owned land and is an additional amount of money on top of the three below market rate units that the city’s ordinance requires and would be constructed with this project and are not the same amount of money and the city is not selling its portion of its land for $272,000 as a separate amount payable for unfortunately, Fog City Java closes at noon, because there is so little traffic during the report’s purported and unsupported peak times.
3 Agenda Packet at page 449.
4 Agenda Packet at page 446
1.n
Packet Pg. 1250 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
5 affordable housing purposes.
Certainly, it is within the purview of the City Council to ask these questions, even if Planning Commissioners were denied an answer. As was discussed in detail during this same May 2022 City Council meeting in which Appellant Goodale was to testify, Pacifica Parents face dire child care shortage.
Cabrillo parents do not have access to child care in Linda Mar: their best option is to be bussed to the Boys and Girls Club in the back of the Valley which is now under threat of closure. Selling off public within walking distance to a public school and adjacent to community center without at least public disclosure of the terms or proper allocation towards Affordable Housing requirements of this sale may be a violation of the Surplus Lands Act (AB 1486, Ting, 2019) and Assembly Bill 1255 (Robert Rivas, 2019), which requires cities and counties to inventory and report surplus and excess local public lands.
Furthermore, it precludes our City from investing in its most valuable asset, its citizens and its children.
Evidence of Biological Resources Must Be Considered
You will hear tonight from esteemed local naturalist and long‐time Pacifican Margaret Goodale who has filed the appeal of this decision before you. I have very little to add in this regard5 , as she knows more
about wetlands and its animals than I could ever absorb.
However, I did note that that the application has submitted new testimony after the Planning Commission Meeting.6
Here, the applicant attempts to introduce new evidence from a Madrone Ecological Consulting substantiating the applicant’s original “unconventional” report from Wood Biological Consulting. The consultant honestly and transparently shares that Madrone’s review was only with respect to the riser area in question: the Consultant “did not visit the site or take data of our own to determine the accuracy of the data in the field.”
I am attaching a memorandum from Dr. Peter Baye, a well-known Coastal biologist: we openly and notoriously wander the same paths in Pedro Point and Linda Mar, including this project site. In this memo, Dr. Baye has provided substantial evidence to “correct erroneous biological assessments on which the City of Pacifica may be relying for permit decisions regarding wetland impacts and endangered species.” Dr. Baye provides substantial evidence that the project will have a significant effect on the environment.
As recently determined,7 the “City [of Pacifica] solely relied on the developer’s experts who criticized Plaintiffs’ experts, which is insufficient. Without any specific findings of credibility by the City Council, Planning Commission or City staff, the City failed to meet its burden.”8
Please send this project back to the Planning Commission for a proper review, detailed traffic studies and further consultation from the school and environmental community before proceeding with a sale 5 Except for a list of Potential Endangered Species generated by US Fish and Wildlife Service at the project location, Attachment 4 of this letter.
6 Agenda Packet Page 1165, Attachment K. It should be noted that the applicant’s own retained consultant characterized the prior expert hired by the same applicant’s approach as unconventional. 7 San Mateo County Superior Court: Order on Plaintiffs / Petitioners Motion For Judgment On Writ Of Mandate Of First Cause Of Action Under CEQA. Coalition Of Pacificans For An Updated Plan et al, vs. City Council Of The City Of Pacifica et al. June 20, 2022.
8 Id. At page 12, lines 6‐9
1.n
Packet Pg. 1251 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) Public Comment of Cherie Chan in Support of Appellant Margaret Goodale June 27, 2022 Agenda Item 11, 570 Crespi Appeal
6 of public lands and a new development project which will forever remove Pacifica’s last vestiges of Lake Mathilda and its surrounding wetlands.
Sincerely,
Cherie Chan
Resident on San Pedro Avenue, Parent at Cabrillo School Attachments:
This Letter in word format: 2022-06-27_AgendaItem11_Crespi 1_Pacifica Safe Routes to School Summary Report
2_BayeLetter
3_San Mateo County Superior Court CEQA Ruling for CPUP
4_Crespi-19-HomesSpeciesList
1.n
Packet Pg. 1252 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1253 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1254 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1255 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1256 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1257 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1258 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1259 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive
1.n
Packet Pg. 1260 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1261 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1262 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1263 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1264 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1265 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1266 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1267 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive
1.n
Packet Pg. 1268 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1269 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1270 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1271 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1272 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1273 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1274 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1275 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1276 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1277 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1278 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1279 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1280 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Cherie Chan
To: Public Comment
Cc: Stan Zeavin
Subject: Fwd: Agenda Item 1, 570 Crespi Appeal
Date: Monday, October 6, 2025 12:08:09 PM
Attachments: Dr BayeLetter Crespi.pdf
USFWS Crespi-19-HomesSpeciesList.pdf
[CAUTION: External Email]
Due to size limitations, I am attaching these two files to my comments.
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1281 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1282 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1283 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1284 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1285 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1286 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1287 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1288 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1289 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1290 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1291 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1292 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1293 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1294 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1295 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1296 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1297 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1298 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1299 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1300 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Cherie Chan
To: Public Comment; Stan Zeavin
Subject: Re: Agenda Item 1, 570 Crespi Appeal
Date: Monday, October 6, 2025 12:18:42 PM
Attachments: image.png
[CAUTION: External Email]
Final attachment:
As noted, construction crews already park at this City-owned site with complete disregard for public safety.
Here is a truck parked, without a driver on Thursday, February 27th at 8:04 am, blocking pedestrian and bicycle access between the Community Center at the proposed project site, forcing all pedestrians into the middle of Crespi Avenue.
On Mon, Oct 6, 2025 at 12:06 PM Cherie Chan <[email protected]> wrote:
Due to size limitations, I am attaching these two files to my comments. --
Cherie Chan
(510) 703-3748
CAUTION: This email originated from outside of the City of Pacifica. Unless you
1.n
Packet Pg. 1301 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1302 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Michael Foley
To: Public Comment
Subject: file no. 2016-004
Date: Friday, October 10, 2025 4:34:20 PM
[CAUTION: External Email]
To whom it may concern,
I am in my late 70s and two to health issues I was unable two intend a meeting on Monday, October 6, 2025 in the city council chambers. I also realize that these comments should've been sent sooner. I have been a home owner in Pacifica for more than 30 years and I hope someone will address these questions.
Regarding the building of the two-story mixed use commercial and residential building at 570 Crispy Drive and on a portion of 940 Crespi Drive,
I have several questions
.
!. For years this area has been referred to as a, "flood zone”. Building anything there was alwaysout of the question.
Why is this building being allowed now, and who is involved in this process? Is everything legal and above board?
2. Adding 19 residential units and a mixed use commercial building will compromise traffic in the morning during commuting hours. This neighborhood has enough people right now. If we were going to add more housing I would suggest duplexes and quadplexes as a better solution. Instead of housing all the people in one area they would be spread out, lessening their impact on the community.
3. The most obvious place for a new housing in the south end of Pacifica would be where the now closed Sea Bowl bowling alley sits. Housing there would not interfere with the traffic on Crespi or on Lindamar. My question is why isn't that area being considered for a new housing?
Thank you,
Michael Foley
Pacifica, CA
94044
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1303 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: 570 Crespi wetland, planning commission meeting 11/3/25 Date: Saturday, November 1, 2025 10:59:03 AM
[CAUTION: External Email]
Honorable Planning Commissioners,
For the sake of one or two condominiums, Pacifica may choose to sacrifice the last acre of Lake Mathilda, one of our two major wetlands. What’s left of Mathilda’s original 18 acres is now penned in on three sides by development. If the 570 project moves forward as is, there will be a retaining wall essentially butted up against the fourth side of this wetland, leaving no room for Mathilda to breathe, i.e., no buffer zone.
The buffer zone protects the integrity of a wetland. With no buffer zone Mathilda will likely disappear. While the general rule for wetlands is to leave a 50’ to 100’ buffer zone (see Pacifica’s own LCLUP), neither the stated owners (who don’t even own the property yet) nor the city (which does) acknowledge the necessity of any buffer zone.
A very small 17’ buffer zone can easily be realized by removing one condo - or much better, a 34’ buffer zone by removing two condos. A wider buffer allows for ground water rise due to sea level rise in the future.
It is irresponsible to plan for construction and base the disregard for a buffer on the presence or absence of endangered species. The reality is that during the WWEB construction ground water was being pumped. Pumping and construction virtually assured that for the two years of observation there would be no California Red Legged Frogs in the area. But there are limitations to basing decisions only on the presence or absence of endangered species.
The resident chorus frogs are not a threatened species, therefore no need to worry about their home, even if Mathilda disappears. This kind of reasoning is what has led to the disappearance of 95% of these very special wetland ecosystems in California.
Commissioners, please consider a small compromise that would give Mathilda a chance to survive. Remove one to two condos from the stated plan and include a buffer. Protecting what’s left of our historic ecosystems is at least as important as increasing the size of our city.
Thank you,
Stan Zeavin
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1304 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: 570 Crespi wetland consideration, from M Goodale Date: Saturday, November 1, 2025 11:43:44 AM
[CAUTION: External Email]
Honorable Commissioners,
I ask that you seriously revisit the Green Foothills letter of early October from Lennie Roberts.
Also, please think about the broader significance of wetlands and the importance of separating development from wetland conditions for the safety both of the development and the wetland.
Removing Conservation status from the wetland in favor of the less restrictive Open Space designation is a serious mistake.
Rather than looking only at the mitigations proposed and dismissing the likelihood of ESA protected species, consider the whole of the Mathilde wetland. It is short-sighted to narrowly limit your consideration to only those species already in danger of extinction.
As noted on Page 4.1-28, “Wetlands are considered sensitive environmental resources protected at federal, State, and local levels. Wetlands provide unique habitat functions and values for wildlife, and provide habitat for plant species adapted to wetland hydrology. Throughout the State, the quality and quantity of wetlands has dramatically declined.“
According to current estimates 95% of wetlands are gone statewide. Only 5% of our original wetlands remain as we expand our human footprint. Mathilde is an example of this loss. Less than one acre remains of the documented historic eighteen acres.
The City of Pacifica General Plan 20407 and the City of Pacifica General Plan Update and General Plan Update EIR provide information and definitions for “intact native habitats…(including).... arroyo willow scrub, emergent marsh, seasonal wetland…(and) wetland criteria…”
All the aquatic resources in the 570 Crespi study area are wetlands and are normally considered a special status community.
Various Implementing Policies offer analysis of “development that would
1.n
Packet Pg. 1305 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) significantly disrupt habitat values” (Page 4.1-17). Examples are:
Implementing Policy CO-I-26 says “establish no-disturbance buffers” (around sensitive habitats).
Policy CO-I-30 Fuel Modification. “Ensure that new development is sited and designed to minimize the need for fuel modification and vegetation clearance in order to avoid or minimize the disturbance or destruction of habitat and existing hydrology.”
On Page 4.1-20 Standards of Significance. One of those standards is whether development may “Interfere substantially with the movement of any native resident…or established native wildlife.”
One solution to those problems is a “construction-free buffer zone.” This memorandum offers detailed mitigation efforts based on the possibility of the presence of FESA listed or other special species and dismisses the likelihood of the any possibility of CRLF presence.
As evidence for the non-use of Mathilde by CRLF, in the 2023 UPDATE, WOOD notes on PAGE 11 –“Permanent ponded water for the minimum duration of 11-20 weeks required for larval development was not observed during two years of construction of the City’s wet weather equalization basin.” Ponding during that time period is not a reliable indicator of usual conditions or of CRLF presence, of course, because ground water was being pumped both prior to and during the WWEB construction. Disruption of the entire area would have virtually guaranteed that for the two years of biologist monitoring there would be no frogs intrepid enough to attempt the area.
Elsewhere the study notes: ”unusually large precipitation events or seasonal cumulative totals can cause ponding to persist for several months, as occurred following the greater than normal precipitation total for the winter of 2022 to 2023.” With climate change occurring, such storm events will occur more often.
Wood Biologic’s exploration of the route that could be taken by RLF from San Pedro Creek to the Mathilde wetland is detailed, but the opinion that the route is unlikely does not make it impossible. Only an expert with the experience and the appropriate permit from CDFW can make that determination. CRLF travel over Mori Point from Laguna Salada to the Quarry rock washing ponds has been well documented since the 1940s.
Even after the disruption of construction of the WWEB and continuing today, a
1.n
Packet Pg. 1306 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) remarkable Chorus Frog population and nursery exist on the site. Deer visit to feed and Great Blue Herons enjoy the shallow water and are “established native resident(s).” Red-shouldered Hawks hunt in the uplands from adjacent rooftops. Frogs also utilize the upland areas which will be inaccessible to them after the construction of the temporary protective fencing and the permanent retaining walls installed at the exact edge of the wetland boundary.
The Lake Mathilde Wetland is unquestionably a “sensitive environmental resource … and provide(s) unique habitat functions and values for wildlife.” All the careful protections that are legally applied to endangered and threatened species are also appropriate for threatened wetlands.
My perspective on what the CDFW identifies as “reasonable and prudent alternatives” would be to protect the wetland. Comply at least with the buffer required in Pacifica’s GP which is much less than the minimum of 30 feet up to 150 feet that is considered reasonable by many agencies and jurisdictions.
The 570 Crespi current design plans place a retaining wall at the immediate edge of the delineated wetland boundary.
A development setback of just 17 feet, the width of one condo, would give a nod toward compliance with the buffer proposed in our Pacifica GP and allow a bit of upland habitat. This small buffer would also reduce the likelihood of standing water against the retaining wall during the increasingly wet and frequent storms that, given the certainty of ocean warming, sea level and ground water rise, and climate chaos, are our future.
Thank you for your consideration,
Margaret Goodale
48 year resident
Pacifica
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1307 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Stan Zeavin
To: Public Comment
Subject: Mathilde wetland at 570 Crespi, M Goodale
Date: Saturday, November 1, 2025 11:48:47 AM
[CAUTION: External Email]
Honorable Planning Commissioners
What do you value about the history of Pacifica? What do you value about the environment of Pacifica? What do you consider to be your responsibility to preserve or protect either the environment or the history of our very unique town?
The value of wetlands was not understood in the 1900s or the 1950s or when the AT&T building and parking lots were built or even the Crespi Center. However, we now know how the many different kinds of wetlands function to benefit the entire healthy environment. There are now agencies that safeguard their health and work to preserve their essential functions. We can no longer claim ignorance.
Sadly, the City of Pacifica has ignored the essential functions of the Mathilde Wetland, excluding it from the General Plan definition of wetlands. Focused on creeks and beaches we, myself included, missed that exclusion. Now, it is not too late to reconsider the broader importance of wetlands to more than just species threatened with extinction.
The 570 project as presently configured will turn the Mathilde Wetland into a private backyard. The project will ERASE HISTORY and permit the death by a thousand cuts to this last remnant of the original 18 acre lagoon.
Your choice is to honor our history or erase it permanently.
Thank you for caring about Pacifica,
Margaret Goodale
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1308 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Updegrave, Samantha
To: Public Comment
Subject: FW: 11/3/25 570 Crespi project New public hearings item 1 Date: Monday, November 3, 2025 9:54:12 AM
From: Suzanne Moore <[email protected]>
Sent: Monday, November 3, 2025 9:42 AM
To: _Planning Commission Group <[email protected]> Cc: Suzanne Moore <[email protected]>
Subject: RE: 11/3/25 570 Crespi project New public hearings item 1 [CAUTION: External Email]
Honorable Commissioners, 570 Crespi Project designers, and neighbors, I appreciate that this project has made strides to protect our historic wetlands and reimburse this community for our surplus land at 540 Crespi. I believe public land should be used for public good.
I would hope that Commissioners would ask for clear, transparent, and equitable plans for the construction and sale of the 3 below-market rate units and make that a part of the written agreement.
I also hope that Commissioners might use their influence with the City to create a robust path to reach out and incentivize nonprofits to build in Pacifica. Current City staff may be unaware; but in 2023, as 540 was declared surplus land, local housing advocates had reached out to a nonprofit to discuss construction of 19 below-market rate family units at the site. There was interest; but without a clear path for moving forward, the opportunity was lost.
Again, I believe public land should be used for public good. Please advocate for our City to develop a dedicated housing outreach team to encourage nonprofit development.
Thank you.
--
Suzanne Moore
Home
Cell
CAUTION: This email originated from outside of the City of Pacifica. Unless you
1.n
Packet Pg. 1309 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1310 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Cindy Abbott
To: Hauser, Samantha; Berman, Lauren; Davis, Marjory; Devine, Daniella; Ferguson, Alex; Godwin, James; Redfield, Chris
Cc: Public Comment
Subject: Re: Planning Commission Meeting, Oct 6, Agenda #1 Protect and Restore the Historic Lake Mathilde Wetlands - Vote NO to Habitat Destruction
Date: Monday, November 3, 2025 11:43:16 AM
Attachments: Tentative Map 570 Crespi project 11 2025.pdf [CAUTION: External Email]
Dear Pacifica Planning Commission,
Below is one of several public comment letters sent over a number of years about the project proposed for 570 Crespi Drive (and purchase of a portion of public property at 540 Crespi Drive). Oddly, the project now includes a new zoning text amendment that provides for the back of 540 Crespi Drive (the publicly owned property) be deemed as “Conservation Area”.
While it is appreciated that the value of the historic Mathilde Wetland will be appropriately rezoned, the boundary of that rezoning is not appropriate. The environmentally detrimental project continues to abut the wetland/conservation area, and provides no appropriate buffer to the sensitive wetland area. The maps and visuals for the project reflect literally no buffer. (See Tentative Map For Lot Merger and Condominium Purposes, 570 Crespi Drive in the packet and attached here).
The staff report notes that the historic Mathilde Wetland is not federally recognized. Anyone standing by the wetland though can find evidence of plant life and wildlife that reveals the area as a wetland.
Let’s look back at this project… what began as a multi-use commercial and condominium project that would bring 9 new housing units to the area, more than doubled in scope to the current 19 units. The project should not be approved without going back to the smaller project that doesn’t impact the wetland.
In addition to asking about the wetland setbacks – and hopefully requiring the movement of the back buildings (see email below) please also consider:
1.n
Packet Pg. 1311 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) ·
The Community Center parking lot and driveway
realignment has not been publicly studied as to its safety or impact on the community-at-large. Why would agreement be given to reduce the number of onsite parking spaces? AND to lease an actively used public driveway that is for
public/community center use? This highly utilized public area is already challenged with limited parking and has a significant number of walkers and bikers who go traverse the area on their way to the community center, local school and beach.
·
Why is city owned public property being sold for private development? What potential is there for this area of public property – adjacent to the community center that is space constrained and could benefit the public with the use of portable structures for use by youth and other public programming? This has never come to robust public discussion, being buried in the details of this project.
Again, let’s take this project back to the initial concept: 9 units of housing and needed commercial space AND protections for the wetland and public community assets.
Thank you,
Cindy Abbott
West Sharp Park
On Mon, Oct 6, 2025 at 11:54 AM Cindy Abbott <[email protected]> wrote:
Dear Members of the Planning Commission,
Tonight you have the opportunity to protect and restore the last part of the historic Lake Mathilde Wetlands. What was a primary feature of the San Pedro Valley, has been impacted by generations of development.
One portion of this important wetland though remains, the south part of the lot at 570 (and 540) Crespi Drive.
Pacifica's General Plan 2040 clearly reflects the conflict between this project and Pacifica's own policies. The General Plan 2040 -- that several of you just approved and recommended to the Pacifica City Council to also approve -- includes the following:
CO-I-4: Wetland Preservation: Prohibit new development in existing wetlands except as allowed under the federal Clean Water Act and California Coastal Act.
CO-I-5: Limitations on Diking, Filling or Dredging: Only permit the diking, filling or dredging of... wetlands... where there is no feasible, less environmentally damaging alternative and where feasible mitigation measures
1.n
Packet Pg. 1312 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) have been provided to minimize adverse environmental effects.
CO-I-7: Maintain Functional Capacity of Wetlands: Ensure that any diking, filling or dredging in existing wetlands maintains or enhances their functional capacity.
The project description and drawings reflect the conflict and significant flaw in the project. The condominium units (part of the residential condominium buildout) do NOT leave the southern portion of the project "undisturbed" . There is NO required buffer between the wetlands delineation line and Building C or in other areas of the project design. This is in conflict with general practices in other municipalities, the Pacifica General Plan, AND the also recently approved LCLUP. (Note: We recognize this area is outside of the Coastal Zone, however with both the General Plan and LCLUP policies, the current project conflicts with overall guiding City of Pacifica planning documents.)
Over the years this development has been contemplated, the important wetlands remnant has already suffered from illegal grubbing.
Additionally, the project also removes trees without appropriate replacement and will impact the use of limited public parking spaces, and create traffic safety concerns in an area that is already prone to accidents.
Step back and consider the ramifications on the habitat, risk to the project when rains happen and it floods, and protect the history and preserve the Mathilde wetlands.
Thank you,
Cindy Abbott
West Sharp Park
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1313 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1314 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1315 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Alexandra Mendoza
To: Public Comment
Cc: Hauser, Samantha; Berman, Lauren; Davis, Marjory; Ferguson, Alex; Godwin, James; Devine, Daniella Subject: Fwd: 570 Crespi Dr comment letter
Date: Monday, November 3, 2025 3:34:03 PM
Attachments: 570 Crespi Dr Comment Letter.pdf
[CAUTION: External Email]
Hello,
After reading through the staff report for tonight's discussion of 570 Crespi Dr, I wanted to correct staff's comment on page 57 that mentions there were no additional public comments to the recirculated Biological Resources section. I wanted to bump my submission that I sent to the public comment email on September 15th with my letter on behalf of Green Foothills for the project.
Best,
Lexi
photo Alexandra Mendoza (She/Her)
Environmental Associate
Green Foothills | (650) 968-7243 | greenfoothills.org
Join the movement for local nature. Sign up for alerts. ---------- Forwarded message ---------
From: Alexandra Mendoza <[email protected]>
Date: Mon, Sep 15, 2025 at 11:21 AM
Subject: 570 Crespi Dr comment letter
To: <[email protected]>
Hello,
Attached is Green Foothills comments for the recirculated Biological Resources section of the DEIR for 570 Crespi Dr.
Please let me know if you have any questions or any issues with the document.
Best Regards,
Lexi
photo Alexandra Mendoza (She/Her)
Environmental Associate
Green Foothills, 3921 E Bayshore Rd, Palo Alto, CA 94303 (650) 968-7243 | greenfoothills.org
CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1316 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) 1 September 15, 2025
Brianne Harkousha, Community Development Deputy Director City of Pacifica Planning Division
1800 Francisco Boulevard, Pacifica, CA 94044
Email: [email protected]
Re: 570 Crespi Dr Project
Dear Ms. Harkousha,
Green Foothills submits the following comments for the partially recirculated Biological Resources section of the Draft Environmental Impact Report (DEIR). Green Foothills is a local nonprofit organization that works to protect local nature and farmland in San Mateo County, Santa Clara, and San Benito Counties, including the San Mateo coast since 1962.
The proposed project at 570 Crespi Dr in Pacifica plans to build one commercial condominium and 19 residential condominiums, on a newly merged 1.68 acre parcel. As described in the partially recirculated DEIR, the southern portion of the parcel has been deemed a wetland while the northern portion does not qualify. The following are comments that Green Foothills has on the biological resource section of the DEIR, but do not represent a comprehensive list:
The project conflicts with implementation and guiding policies in Pacifica's General Plan 2040.
CO-I-4: “Wetland Preservation: Prohibit new development in existing wetlands except as allowed under the federal Clean Water Act and California Coastal Act.” CO-1-5: “Limitations on Diking, Filling or Dredging: Only permit the diking, filling, or dredging of…wetlands…where there is no feasible, less environmentally damaging alternative and where feasible mitigation measures have been provided to minimize adverse environmental effects.” CO-I-7: “Maintain Functional Capacity of Wetlands: Ensure that any diking, filling, or dredging in existing wetlands maintains or enhances their functional capacity.” The above policies are just some of the guidelines in Pacifica’s General Plan that encourage wetland conservation and restoration. The project at 570 Crespi Dr directly contradicts these goals. The size and location of the buildings on the parcel would directly impact the adjacent habitat, ignoring the well known fact that promoting healthy landscapes also requires that surrounding land encourage habitat health. The city has a unique opportunity to restore a portion of the historic Lake Mathilde and provide important species habitat, for both special status species such as the California red-legged frog as well as non special status species. Additionally, as we continue to face climate change, preserving these sensitive habitats to help promote resilient cities becomes increasingly more urgent.
There should be implementation of buffer zones between the wetlands and buildings.
1.n
Packet Pg. 1317 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) 2 The 19 condominiums and one commercial condominium are all planned to be built on the northern portion of the site (as seen in Figure 3-3 in the Project Description chapter of the DEIR), leaving the southern portion “undisturbed.” The construction appears to lead directly up to the boundary of the emergent wetland with a wood deck and concrete pathway brushing the border. Pacifica’s LCLUP, recently approved by the California Coastal Commission in April of 2025, sets up an implementation guideline of a 100-foot buffer around environmentally sensitive habitats and wetlands, which is not to be reduced to less than 50 feet. While this location sits outside of the coastal zone, as a document that is meant to guide decisions the LCLUP gives the city a good set of baseline policies to follow throughout Pacifica.
Figure 3-13 from the Project Description provides a closeup depiction of what the boundaries will look like between the construction in the northern portion versus the wetlands in the southern part. The figure clearly depicts the wetland delineation line overlapping with Building C, and fails to incorporate an appropriate buffer in other locations of the project design. This would go against general practice that other cities take around their wetlands, and Pacifica’s own LCLUP. Buffer zones help mitigate issues around flooding that can be common when building around wetlands, something that infrastructure surrounding 570 Crespi Dr have already experienced.
Despite being isolated, this parcel presents an opportunity to provide a “stepping stone” in wildlife movement in an urbanized area.
The recirculated DEIR claims that the project would have a less than significant impact to wildlife movement since it is fragmented and isolated from other similar landscapes, also emphasizing that there are other plots around the city more conducive to being a wildlife corridor. While the definition and baseline that the DEIR uses is commonly used, this definition lacks the necessary flexibility and approach needed in more urban settings. Many times in urbanized cities it is hard or impossible to be able to physically connect two pieces of land due to various constraints, such as ownership or jurisdictional boundaries. Therefore, it is important to expand the definition of what determines a parcel’s importance in aiding wildlife movement, looking instead at a site's ability to provide an important stepping stone between fragments and helping prevent isolation of larger areas. Surrounding parks, backyards, and green spaces realistically play a key role in species movement in urbanized settings. The DEIR fails to acknowledge this nuanced definition of wildlife corridors in urban cities like Pacifica, therefore it improperly determines this impact as less than significant.
Green Foothills thanks you for taking the time to read and consider our comments.
Respectfully,
Alexandra Mendoza
Environmental Associate
Green Foothills
1.n
Packet Pg. 1318 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations) From: Cindy Abbott
To: Hauser, Samantha; Berman, Lauren; Ferguson, Alex; Redfield, Chris; Davis, Marjory; Godwin, James; Devine, Daniella; Public Comment
Subject: Mathilde Wetlands - images
Date: Monday, November 3, 2025 6:51:30 PM
Attachments: Mathilde Wetlands (1).pdf
[CAUTION: External Email]
See attached. Re Planning Commission Nov 3, 2025, Public Hearing Item 1 CAUTION: This email originated from outside of the City of Pacifica. Unless you recognize the sender's email address and know the content is safe, do not click links, open attachments or reply.
1.n
Packet Pg. 1319 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1320 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)
1.n
Packet Pg. 1321 Attachment: ATT M_Public Comment Received From 2025-10-01 through 2025-11-26 (6098 : Crespi Drive Mixed Use Project Considerations)