CITY OF PALM DESERT
STAFF REPORT
MEETING DATE: May 8, 2025
PREPARED BY: Maria Gonzalez, Management Analyst
Chris Gerry, Senior Project Manager
SUBJECT: APPROVE THE START OF PROCEEDINGS TO LEVY AND COLLECT
THE ANNUAL ASSESSMENT FOR CITY OF PALM DESERT BENEFIT
ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2025/26
RECOMMENDATION:
1. Adopt a Resolution entitled “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM DESERT, CALIFORNIA, INITIATING PROCEEDINGS FOR THE LEVY AND
COLLECTION OF ASSESSMENTS FOR PALM DESERT BENEFIT ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2025/2026.”
2. Adopt a Resolution entitled “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM DESERT, CALIFORNIA, DECLARING ITS INTENTION TO LEVY THE ANNUAL ASSESSMENT FOR CITY OF PALM DESERT BENEFIT ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2025/2026, PURSUANT TO THE BENEFIT ASSESSMENT ACT OF 1982 AND APPOINTING A TIME AND PLACE FOR THE PUBLIC HEARING ON THESE MATTERS,” and setting a Public Hearing to be held at Palm Desert City Hall on Thursday, June 26, 2025, at 4:00 p.m.
BACKGROUND/ANALYSIS:
The City of Palm Desert (City) established Benefit Assessment District (BAD) No. 1 to fund the operation and maintenance of a regional stormwater drainage system located in Section 29. The system, which includes a retention basin and related infrastructure, is designed to protect developed parcels in the area by controlling stormwater runoff and reducing the risk of flooding.
The BAD was formed under the Benefit Assessment Act of 1982, and the cost of these services is shared among properties that directly benefit.
Each property in the BAD is charged an annual assessment based on its proportional benefit using a method called Equivalent Benefit Units (EBUs). EBUs take into account factors such as parcel size, land use, and development status. For instance, a larger commercial lot that generates more runoff will be assigned more EBUs than a smaller residential parcel. This approach ensures that each property pays its fair share based on the level of benefit it receives from the drainage improvements.
The assessment calculations and methodology were prepared by Willdan Financial Services, the City’s independent assessment engineer. Willdan also authored the attached 2025-26 Engineer’s Report, which provides the technical basis for the proposed levy. The report includes parcel-level calculations, district boundaries, the formula used to assign EBUs, and a summary of current and long-term funding needs, including reserve and capital improvement components. 297
City of Palm Desert
Approve Resolutions for Benefit Assessment District No. 1
The full levy amount of $625 per EBU is proposed for Fiscal Year 2025-26. This rate is within the maximum allowed and is needed to support continued maintenance, administration, and capital reserves for the system. The BAD boundaries and affected parcels are detailed in the Engineer’s Report (page 12).
City Council is required to declare its intention to levy the assessment and initiate proceedings in order to facilitate the legal requirements necessary to collect the assessment. A public hearing is proposed for June 26, 2025, to allow property owners and the public to comment on the proposed levy before adoption.
Legal Review:
This report has been reviewed by the City Attorney’s Office.
FINANCIAL IMPACT:
The assessment and collection of the full levy amount covers the ongoing maintenance of the Section 29 retention basin, a potential expansion, and associated administrative costs.
Anticipated revenues and expenditures for the BAD have been included as part of the FY 2025- 26 Proposal Annual Budget.
ATTACHMENTS:
1. Resolution – Initiate Proceedings
2. Resolution – Intent to Levy and Set a Public Hearing
3. FY 2025-26 Engineer’s Report
298
RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM
DESERT, CALIFORNIA, INITIATING PROCEEDINGS FOR THE LEVY
AND COLLECTION OF ASSESSMENTS FOR PALM DESERT BENEFIT
ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2025/2026
WHEREAS, the City Council, by previous action and resolution, formed the ”Palm Desert Benefit Assessment District No. 1” (hereafter referred to as the “District”), pursuant to the Benefit Assessment Act of 1982, chapter 6.4, division 2, title 5 of the Government Code of the State of California, commencing with section 54703 (hereafter referred to as the “Act”), that provides for the collection of assessments by the County of Riverside on behalf of the City of Palm Desert to pay for the maintenance, operation, and services of improvements related thereto; and
WHEREAS, the City Council desires to initiate proceedings for the levy and collection of annual assessments for the fiscal year 2025/2026 for the maintenance, operation, and servicing of the drainage basin and facilities that provide benefit to the property within the District pursuant of the provisions of the Act; and WHEREAS, the City has retained Willdan Financial Services for the purpose of assisting with the annual levy of the District, including the preparation and filing of an Engineer’s Annual Levy Report (hereafter referred to as the “Report”) with the city clerk, in accordance with the provisions of the Act.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Palm Desert, California, as follows:
SECTION 1. That the foregoing Recitals are true and correct and are incorporated herein by this reference.
SECTION 2. Order. The City Council hereby orders Willdan Financial Services to prepare and file with the city clerk the Report on the levy of assessments for the District for the fiscal year commencing July 1, 2025, and ending June 30, 2026.
SECTION 3. Purpose of District. The purpose of this District is to fund the activities necessary to operate, maintain, and serve the drainage basin constructed in a portion of Section 29, Township 4 South, Range 6, East SBM and to be enlarged in connection with current and new development of properties. The maintenance, operation, and servicing of these improvements may include, but are not limited to, all materials, equipment, labor and incidental expenses deemed necessary to keep the drainage basin in satisfactory condition. The Report will provide a more detailed description of the improvements and services that the District provides. There are no new improvements or substantial changes in the existing improvements proposed as part of this Resolution.
SECTION 4. Necessity for Levy and Collection of Assessments. The City Council 299
Resolution No. 2025-____ Page 2
hereby determines that to provide the improvements generally described in section 3 of this resolution and shown, in detail, in the Report, it is necessary to levy and collect assessments within the District for fiscal year 2025/2026 and that such improvements will be outlined and described in the Report and imposed, pursuant to the provisions of the Act and the requirements of California Constitution articles XIII C and XIII D.
SECTION 5. Effective Date. This resolution shall become effective immediately upon its adoption.
ADOPTED ON ________________, 2025.
JAN C. HARNIK
MAYOR
ATTEST:
ANTHONY J. MEJIA
CITY CLERK
I, Anthony J. Mejia, City Clerk of the City of Palm Desert, hereby certify that Resolution No. 2025-__ is a full, true, and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Desert on _______________________, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSED:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Palm Desert, California, on ___________________.
ANTHONY J. MEJIA
CITY CLERK
300
RESOLUTION NO. 2025-____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM
DESERT, CALIFORNIA, DECLARING ITS INTENTION TO LEVY THE
ANNUAL ASSESSMENT FOR CITY OF PALM DESERT BENEFIT
ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2025/2026,
PURSUANT TO THE BENEFIT ASSESSMENT ACT OF 1982 AND
APPOINTING A TIME AND PLACE FOR THE PUBLIC HEARING ON
THESE MATTERS
WHEREAS, the City Council, by previous action and resolution, formed the “Palm Desert Benefit Assessment District No. 1” (hereafter referred to as the “District”), pursuant to the Benefit Assessment Act of 1982, chapter 6.4, division 2, title 5 of the Government Code of the State of California, commencing with section 54703 (hereafter referred to as the “Act”), for purpose of levying annual assessments upon benefiting properties within the District for the maintenance, operation, and servicing of drainage basin and facilities related thereto; and
WHEREAS, the City Council proposes to levy and collect assessments against lots and parcels of land within the District for fiscal year 2025/2026, to pay the maintenance, servicing, and operation of the improvements related thereto, pursuant to the provisions of the Act; and
WHEREAS, Willdan Financial Services has prepared and filed an Engineer’s Annual Levy Report (hereafter referred to as the “Report”) with the city clerk, and the Report has been presented to the City Council in connection with the District and the levy of assessments, pursuant to section 54716 of the Act and is hereby incorporated by reference; and
WHEREAS, the City Council has examined and reviewed the Report, as presented, and is preliminarily satisfied with the description of the District, and improvements identified therein; each of the budget items and documents as set forth therein; and is satisfied that the proposed assessments contained therein have been spread in accordance with the special benefits received from the improvements, operation, maintenance, and services to be performed within the District, as set forth in the Report or as modified by City Council action and incorporated herein.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Palm Desert, California, as follows:
SECTION 1. That the foregoing Recitals are true and correct and are incorporated herein by this reference.
SECTION 2. Intention. The City Council hereby declares its intention to seek the annual levy of the District assessments pursuant to the Act, over and including the land 301
Resolution No. 2025-____ Page 2
within the District boundaries to pay the costs of the operation, maintenance, and servicing of the drainage basin and improvements and expenses related thereto for fiscal year 2025/2026.
SECTION 3. Report Approval. For a full and detailed description of the improvements, the boundaries of the District, and the proposed assessments upon assessable lots and parcels of land within the District please refer to the Report, which has been prepared and is on file with the city clerk’s office. The city clerk has presented to the City Council the Report on the proposed improvements, assessments, and levy and collection of assessments for fiscal year 2025/2026, and the Report is hereby approved on a preliminary basis.
SECTION 4. Boundaries and Designation. The boundaries of the District are described in the Report and by reference is made part of this resolution. The District is designated as “Palm Desert Benefit Assessment District No. 1.” SECTION 5. Description of Improvements. Reference is hereby made to the Report for a detailed description of the improvements. The improvements within the District include, but are not limited to, the maintenance, operation, and servicing of drainage basin and facilities related thereto. There are no new improvements or substantial changes proposed to be made to the existing improvements.
SECTION 6. Proposed Assessment Amounts. The proposed assessments are outlined in the Report. District assessments are calculated in accordance with the method of apportionment established for the District and do not exceed the assessment rates and annual inflationary adjustment previously authorized by City Council and approved by the property owners, in accordance with the provisions of California State Constitution Article XIII D. The assessments are not proposed to be increased from the previous year.
SECTION 7. Notice of Public Hearing. Notice is hereby given that a public hearing on these matters will be held on Thursday, June 26, 2025, at 4:00 p.m., or as soon thereafter as feasible, at City Hall (in the City Council Chambers), which is located at 73- 510 Fred Waring Drive, Palm Desert, California. At the public hearing, all interested persons shall be afforded the opportunity to hear and to be heard.
SECTION 8. Publication and Posting of Notice. The City shall give notice of the time and place of the public hearing to all property owners within the District by causing the publishing of this resolution once in the local newspaper not less than ten (10) days before the date of the public hearing, and by posting a copy of this resolution on the official bulletin board customarily used by the City Council for the posting of notices pursuant to the Act. For fiscal year 2025/2026, no new or increased assessments are proposed and a mailing of a notice and ballot to property owners is not required.
SECTION 9. Direction to City Clerk. The city clerk is hereby authorized and directed to give notice of this public hearing, as provided by law. 302
Resolution No. 2025-____ Page 3
SECTION 10. Effective Date. This resolution shall become effective immediately upon its adoption.
ADOPTED ON ________________, 2025.
JAN C. HARNIK
MAYOR
ATTEST:
ANTHONY J. MEJIA
CITY CLERK
I, Anthony J. Mejia, City Clerk of the City of Palm Desert, hereby certify that Resolution No. 2025-__ is a full, true, and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Desert on _______________________, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSED:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Palm Desert, California, on ___________________.
ANTHONY J. MEJIA
CITY CLERK
303
304
27368 Via Industria
Suite 200
Temecula, California 92590
T 951.587.3500 | 800.755.6864
F 951.587.3510
www.willdan.com
City of Palm Desert
Benefit Assessment District No. 1
2025/2026 ENGINEER’S ANNUAL LEVY REPORT
Intent Meeting: May 8, 2025
Public Hearing: June 26, 2025
305
ENGINEER'S REPORT AFFIDAVIT
Benefit Assessment District No.1
The District includes parcels of land within the subdivisions know as Parcel Map No. 24255 (Monterey 170)/
Assessment District 2004-02 (Section 29)
City of Palm Desert,
County of Riverside, State of California
This Report and the enclosed budget, assessments, descriptions and diagrams describe the Benefit Assessment District No.1, and include each lot, parcel, and subdivision of land within the District, as they existed at the time of the passage of the Resolution of Intention. Reference is hereby made to the Riverside County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this ____________ day of ______________, 2025.
Willdan Financial Services
Assessment Engineer
On Behalf of the City of Palm Desert
By: ________________________________
Daniel Louie, Senior Project Manager
District Administrative Services
By: ________________________________
Tyrone Peter
P.E. # C 81888
306
TABLE OF CONTENTS
INTRODUCTION ............................................................................... 1 PART I — PLANS AND SPECIFICATIONS ..................................... 3 A. Benefiting Properties within the District .............................................. 3 B. Funding authorized by the 1982 Act ..................................................... 3 C. Description of Services ......................................................................... 4 PART II — METHOD OF APPORTIONMENT .................................. 5 A. General .................................................................................................... 5 B. Benefit Analysis ..................................................................................... 6 C. Assessment Methodology ..................................................................... 6 D. Assessment Range Formula ................................................................. 8 PART III — DISTRICT BUDGET..................................................... 10 PART IV — DISTRICT DIAGRAMS ................................................ 11 PART V — ASSESSMENT ROLL .................................................. 13 307
2025/2026 Benefit Assessment District No. 1 Page 1
INTRODUCTION
Pursuant to the provisions of the Benefit Assessment Act of 1982, being Chapter 6.4 of the California Government Code, commencing with Section 54703 (hereafter referred to as the “1982 Act”), and in compliance with the substantive and procedural requirements of the California State Constitution Article XIIID (hereafter referred to as the “California Constitution”), the City Council of the City of Palm Desert, County of Riverside, State of California (hereafter referred to as “City”), proposes to levy special benefit assessments for the district designated as:
City of Palm Desert Benefit Assessment District No. 1
Benefit Assessment District No. 1 (hereafter referred to as “District”), which includes lots and parcels of land within the subdivisions known as Monterey 170 and subdivision known as Section 29, within the City limits of Palm Desert. The areas included in the District are also known as Parcel Map No. 24255 (Monterey 170) / Assessment District 2004-02 (Section 29).
The Engineer’s Annual Levy Report (hereafter referred to as the “Report”) describes the District, the services, and the proposed assessments to be levied against properties in connection with the special benefits that the properties will receive from the maintenance and servicing of the District improvements and facilities for Fiscal Year 2025/2026. The District and the assessments described herein will provide a funding source (annual assessments) for the continued operation, maintenance and servicing of the drainage basin, including expansions thereto.
The services and assessments described in this Report are based on the current and planned development of properties within the District and represent an estimate of the direct expenditures, incidental expenses, and fund balances that will be necessary to operate, maintain and service the drainage basin that provides special benefits to properties within the District. The structure of the District (organization), the proposed services, the method of apportionment, and assessments described herein are based on the current and proposed development within the District; and by reference, the plans and specifications for the drainage basin and expansion thereto are made part of this Report.
The word “parcel,” for the purposes of this Report, refers to an individual property assigned its own Assessor’s Parcel Number (APN) by the Riverside County Assessor’s Office. The Riverside County Auditor-Controller uses Assessor’s Parcel Numbers and specific Fund Numbers to identify properties to be assessed on the tax roll for the special benefit assessments.
As part of this District, the City of Palm Desert conducted a Property Owner Protest Ballot proceeding for the proposed levy of a new assessment pursuant to the provisions of the California Constitution, Article XIIID Section 4. In conjunction with this ballot proceeding, the City Council conducted a noticed public hearing to consider public testimonies, comments and written protests regarding the formation of the District and levy of 308
2025/2026 Benefit Assessment District No. 1 Page 2
assessments. At the public hearing, property owner protest ballots received were tabulated and a majority protest did not exist for the proposed assessments and the assessment range formula presented and described herein. The City Council approved the Report, ordered the formation of the District, and approved the levy and collection of assessments.
Each subsequent fiscal year, a Report is prepared and presented to the City Council describing any changes to the proposed services, the annual budget and assessments for that fiscal year, and the City Council shall hold a noticed public hearing regarding these matters prior to approving and ordering the proposed levy of assessments. If the proposed assessments for the District exceed the maximum assessment described herein (as approved by the property owners), the new or increased assessment must be confirmed through another property owner protest ballot proceeding before such an assessment may be imposed. It should be noted that an increased assessment of an individual property resulting from changes in development or land use does not constitute an increased assessment.
This Report consists of five (5) parts:
Part I
Plans and Specifications: A description of the District boundaries and the proposed improvements associated with the District.
Part II
The Method of Apportionment: A discussion of benefits the services provided to properties within the District and the method of calculating each property’s proportional special benefit and annual assessment. This section also identifies and outlines an Assessment Range Formula that provides for an annual adjustment to the Maximum Assessment Rate that establishes limits on future assessments, but also provides for reasonable cost adjustments due to inflation without the added expense of additional property owner protest ballot proceedings.
Part III
The District Budget: An estimate of the annual costs to operate, maintain and service the drainage basin improvements and facilities installed and constructed to support current and proposed development within the District. This budget includes an estimate of anticipated direct maintenance costs and incidental expenses including, but not limited to administration expenses and the collection of appropriate fund balances. The special benefit assessments are based on the overall operation, maintenance and servicing costs minus any costs that are considered general benefit or not assessed as special benefit.
The proposed assessments for the Fiscal Year 2025/2026, shall be based on the estimated net annual cost of operating, maintaining and servicing the District improvements for that fiscal year. The Maximum Assessments Rate (Rates per 309
2025/2026 Benefit Assessment District No. 1 Page 3
Equivalent Benefit Unit) identified in the budget of this Report shall be adjusted annually by the Assessment Range Formula described in the method of apportionment.
Part IV
District Diagram: A Diagram showing the exterior boundaries of the District is provided in this Report and includes all parcels that will receive special benefits from the services.
Parcel identification, the lines and dimensions of each lot, parcel and subdivision of land within the District, are inclusive of all parcels as shown on the Riverside County Assessor's Parcel Maps as they existed at the time of the passage of the Resolution of Intention, and shall include all subsequent subdivisions, lot line adjustments or parcel changes therein. Reference is hereby made to the Riverside County Assessor’s maps for a detailed description of the lines and dimensions of each lot and parcel of land within the District.
Part V
Assessment Roll: A listing of the proposed assessment amount to be applied to each parcel within the District for the Fiscal Year 2025/2026. The proposed assessment amount for each parcel is based on the parcel’s proportional special benefit as outlined in the method of apportionment and the Maximum Assessment Rates.
PART I — PLANS AND SPECIFICATIONS
A. Benefiting Properties within the District
The territory within the District consists of all lots, parcels and subdivisions of land within the subdivision known as Monterey 170 and the proposed subdivision known as Section 29, which encompasses an area of land totaling approximately four hundred sixty acres (460 acres). The subdivisions are generally located:
North of Gerald Ford;
Southwest of Interstate 10;
West of Portola Avenue; and,
East of Monterey Avenue.
B. Funding authorized by the 1982 Act
As generally defined by the 1982 Act and applicable to this District, the City may impose a benefit assessment to finance the maintenance, operation and servicing costs associated with the drainage basin described below.
310
2025/2026 Benefit Assessment District No. 1 Page 4
C. Description of Services
The purpose of this District is to fund the activities necessary to operate, maintain and service the drainage basin constructed in a portion of Section 29, Township 4 South, Range 6 East SBM and to be enlarged in connection with current and new development of properties. The maintenance, operation and servicing of these improvements may include but are not limited to all materials, equipment, labor, and incidental expenses deemed necessary to keep the drainage basin in satisfactory condition. The maintenance of the improvements and related activities shall be funded entirely through the District assessments. The District services are generally described as:
Drainage basin maintenance that may include but is not limited to inspection, repair, removal and replacement, and servicing of drainage basins, inlets, catch basins, manholes, outlets, drywells, pumps, filters and storm drain pipes installed in connection with the development of benefiting properties as well as any off-site improvements and facilities directly associated with the aforementioned infrastructure that is deemed necessary to service or protect the properties; All appurtenant, equipment, materials and service contracts related to the operation, maintenance and servicing of the aforementioned improvements and facilities;
Detailed maps and descriptions of the location and extent of the specific improvements to be maintained by the District are on file in the Office of Public Works and by reference are made part of this Report. The annual cost to provide the services determined to be of special benefit shall be allocated to each property in proportion to the special benefits received from those various services.
Drainage Basin Maintenance
The drainage basin maintenance may include but is not limited to: grading of access perimeter roads, repair of erosion of slopes to access roads, debris clearance, anchor mat repairs, dust control through the application of soil stabilization agents, weed abatement, mosquito and vector control, storm drain inlets and outlets, pumps, filters and pipes. The annual assessments for this District are intended to support the drainage basin and the maintenance program that will adequately regulate and control storm water runoff resulting from current and proposed development within the District. This maintenance program may include but is not limited to: inspection and documentation of the system; cleaning, servicing or repair of the facilities and equipment; and the partial removal, replacement or rehabilitation of equipment and facilities. The drainage basin will cover an area of approximately 4 acres. The Public Works Department shall authorize and schedule all operational activities and maintenance of the drainage basin. 311
2025/2026 Benefit Assessment District No. 1 Page 5
A portion of the services described above might not be performed on an annual basis but due to an extraordinary event, such as replacement of the anchor mats and other major facility repairs, the funds necessary for these activities are collected as part of the annual assessments. The monies collected each year for these extraordinary services shall be accumulated in a special fund of the District (Reserve/Capital Improvement Fund). The monies accumulated for these activities shall be spent as needed to perform the services deemed necessary by the City. This process of providing a reserve/capital improvement shall continue until such time the District is dissolved; or the City determines that such funding procedures require modification. Changes in the process of providing a reserve/capital improvement that would result in an increase in the annual assessment rate must be presented to the property owners for approval prior to imposing such an increase.
In March 2022, the City initiated an evaluation of the Section 29 Retention Basin.
Following an assessment of the basin's capacity, which stands at 45.4 acre-feet, an additional 16.3 acre-feet of retention volume was deemed necessary to mitigate overflow risks and accommodate the storage requirements for a 100-year storm event. The City has since designed for its improvement and expansion, and in December 2023, awarded a construction contract of approximately $4.63 million. The project was completed in August 2024. The City will continue to analyze the maintenance costs of these improvements and incorporate them in future assessments.
PART II — METHOD OF APPORTIONMENT
A. General
The 1982 Act permits the establishment of assessment districts by agencies for the purpose of providing for the maintenance, operation and servicing of drainage and flood control improvements as well as streets, roads, and appurtenant facilities. The 1982 Act further requires that the cost of these improvements be levied according to benefit rather than assessed value:
“The amount of the assessment imposed on any parcel of property shall be related to the benefit to the parcel which will be derived from the provision of the service.” Furthermore:
“The annual aggregate amount of the assessment shall not exceed the estimated annual cost of providing the service, except that the legislative body may, by resolution, determine that the estimated cost of work authorized … is greater than can be conveniently raised from a single annual assessment and order that the estimated cost shall be raised by an assessment levied and collected in installments…. The revenue derived from the assessment shall not be used to pay the cost of any service other than the service for which the assessment was levied.”
312
2025/2026 Benefit Assessment District No. 1 Page 6
The method of apportionment described in this Report for allocation of special benefit assessments utilizes commonly accepted engineering practices and in compliance with the provisions of the 1982 Act and the California Constitution. The formulas used for calculating assessments reflect the composition of parcels within the District and the improvements and services provided, to fairly apportion the costs based on the special benefits to each parcel.
B. Benefit Analysis
Each of the proposed services, and the associated costs and assessments have been carefully reviewed, identified, and allocated based on special benefit pursuant to the provisions of the 1982 Act and the California Constitution. The drainage basin improvements associated with this District are necessary and essential requirements for existing development, and the orderly development of future properties within the District to their full potential, consistent with the conditions for development of the properties, protection of downstream properties which would be negatively affected by increased storm runoff from the developed properties without the basin, and the applicable portions of the City General Plan. As such, the ongoing operation, servicing, and maintenance of those improvements would otherwise be the direct financial obligation of each individual property owner. Since the existing parcels and proposed new development to be assessed are directly served by the drainage basin, each parcel has a direct investment in the proper maintenance of the various improvements that is over and above any general benefits that may be conferred by such improvements and services.
The construction and installation of these improvements are only necessary for the properties within the District. As such, these improvements were not required nor necessarily desired by any properties or developments outside the District boundary and any public access or use of the improvements by others is incidental. Therefore, it has been determined that the ongoing maintenance, servicing and operation of the District improvements provide no measurable general benefit to properties outside the District or to the public at large, but clearly provide distinct and special benefits to properties within the District.
C. Assessment Methodology
All costs associated with the services shall be fairly distributed among the parcels based upon the special benefit received by each parcel. Additionally, in compliance with the California Constitution Article XIIID Section 4, each parcel’s assessment may not exceed the reasonable cost of the proportional special benefit conferred to that parcel. The benefit formula used to determine the assessment obligation is therefore based upon both the services that benefit the parcels within the District as well as the gross acreage of each property as compared to other parcels that benefit from those services.
The method of apportionment established for this District and described herein, reflects 313
2025/2026 Benefit Assessment District No. 1 Page 7
the proportional special benefit each property receives from the services based on the gross acreage of that parcel as compared to the total gross acreage of all properties within the District except those that retain runoff on-site and do not receive any special benefit from those services.
Equivalent Benefit Units
In order to assess benefits equitably it is necessary to relate each property’s proportional special benefits to the special benefits of all other properties within the District. The method of apportionment established for this district, formed under the 1982 Benefit Act, will utilize a weighted method of apportionment known as an Equivalent Benefit Unit (EBU) methodology. This proportional weighting may be based on several factors that may include but are not limited to: the type of development (land use), developmentstatus (developed versus undeveloped), size of the property, location of the property, development plans or restrictions, vehicular trip generation, street frontage, densities or other property related factors. Generally, for most districts the calculation of each parcel’s proportional special benefit can be reasonably determined by applying one or more of these factors.
Since the drainage basin will be constructed to retain runoff from the properties within the District and the cost of maintenance is directly related to the size of the basin, each parcel’s proportional special benefit has been based on the parcel’s gross acreage as compared to the total gross acreage of all other parcels within the District except those that retain runoff on-site and do not receive any special benefit from those services.
Generally, storm water runoff occurs from the entire parcel before and after development.
Thus, the gross size of a parcel prior to development provides a relative comparison to the amount of runoff the parcel will contribute to the drainage basin and thus the cost of maintenance. Therefore, it has been determined that for this District, each parcel’s proportional benefit (Equivalent Benefit Units) shall be equal to the parcel’s gross acreage before development (rounded to two decimal places).
Exempt Parcels — This land use identifies properties that are not assessed and are assigned 0.00 EBU. This land use classification may include but is not limited to:
Lots or parcels identified as public streets and other roadways (typically not assigned an APN by the County) which are otherwise included in the gross acreage of the parcel prior to development.
Dedicated public easements including open space areas, utility rights-of-way, greenbelts, parkways, parks or other publicly owned properties that are part of the District improvements or may provide other benefits to private properties within the District.
Private properties that cannot be developed independently from an adjacent property, such as common areas, sliver parcels or bifurcated lots or properties with very restrictive development use but are included in the gross acreage prior to development.
314
2025/2026 Benefit Assessment District No. 1 Page 8
Parcels owned by the school district, Coachella Valley Water District and private developers that will not be assessed as part of this benefit assessment district, since the runoff generated by these properties shall be captured and retained onsite through the construction and grading of the sites.
These types of parcels are considered to receive little or no benefit from the improvements and are therefore exempted from assessment but shall be reviewed annually by the assessment engineer to confirm the parcels’ current development status. Government owned properties or public properties are not necessarily exempt properties and shall be subject to special benefit assessment unless they qualify for an exempt status. The following formula is used to calculate each parcel’s EBU (proportional benefit).
Total Budget / Total EBU (Gross Acres) = Assessment Rate per EBU (Parcel’s Acreage / Total Net Acreage) x Total EBU = Parcel’s EBU Assessment Rate per EBU x Parcel’s EBU = Parcel Levy Amount For all subsequent parcel subdivisions that result in a final map of buildable residential lots, the number of EBUs assigned to such lots shall be calculated by taking the EBU initially calculated for the original Parcel (identified at the time of this Report) and apportioning the original assigned EBUs equally to the new buildable residential lot(s) or by equivalent gross acreage for non-residential lots created by a subdivision map. The corresponding assessment shall be levied against the applicable corresponding Assessor’s Parcel Number(s).
D. Assessment Range Formula
Any new or increased assessment requires certain noticing and meeting requirements by law. Prior to the passage of Proposition 218 (California Constitution Articles XIIIC and XIIID), legislative changes in the Brown Act defined a "new or increased assessment" to exclude certain conditions. These conditions included "any assessment that does not exceed an assessment formula or range of assessments previously adopted by the agency or approved by the voters in the area where the assessment is imposed." This definition and conditions were later confirmed through Senate Bill 919 (Proposition 218 implementing legislation).
If the proposed annual assessment (levy per EBU) for the upcoming fiscal year is less than or equal to the adjusted Maximum Assessment Rate, then the proposed annual assessment is not considered an increased assessment.
The purpose of establishing an Assessment Range Formula is to provide for reasonable increases and inflationary adjustment to annual assessments without requiring costly noticing and mailing procedures, which could add to the District costs and assessments.
As part of the District formation, the notice and assessment ballots presented to the 315
2025/2026 Benefit Assessment District No. 1 Page 9
property owners for approval, included a maximum assessment amount for Fiscal Year 2007/2008 (initial maximum assessment), identification of the corresponding Maximum Assessment Rate and a summary of the Assessment Range Formula described herein.
The Assessment Range Formula for this District shall be applied to all future assessments and is generally defined:
The Maximum Assessment Rate is equal to the (Initial) Maximum Assessment Rate established for Fiscal Year 2007/2008 adjusted annually by the greater of three percent (3%) or the annual percentage change in the Consumer Price Index (CPI) of “All Urban Consumers” for the Los Angeles-Long Beach-Anaheim Area for March. Starting fiscal year 2019/2020 the Maximum Assessment Rate will be adjusted annually by the greater of three percent (3%) or the annual percentage change in the Consumer Price Index (CPI) of “All Urban Consumers” for the Riverside-San Bernardino-Ontario Area.
Beginning in the second fiscal year (Fiscal Year 2008/2009) and each fiscal year thereafter, the Maximum Assessment Rate will be recalculated, and a new Maximum Assessment Rate established for the fiscal year utilizing the Assessment Range Formula described above. The adjusted Maximum Assessment Rate shall be calculated independent of the District’s annual budget and proposed assessment. The annual percentage change in CPI shall be based on available data provided by the U.S.
Department of Labor; Bureau of Labor Statistics at the time the annual Report is prepared.
Should the Bureau of Labor Statistics revise such index or discontinue the preparation of such index, the City shall use the revised index or comparable system as approved by the City Council for determining fluctuations in the cost of living.
Any proposed annual assessment (rate per EBU) less than or equal to the calculated (adjusted) Maximum Assessment Rate is not considered an increased assessment, even if the proposed assessment is greater than the assessment applied in the prior fiscal year.
To impose a new or increased assessment other than the annual inflationary adjustment provided by the preceding Assessment Range Formula, the City must comply with the provisions of the California Constitution Article XIIID Section 4c, that requires a public hearing and certain protest procedures including mailed notice of the public hearing and property owner protest balloting. Property owners, through the balloting process, must approve a proposed new or increased assessment before such an assessment may be imposed.
316
2025/2026 Benefit Assessment District No. 1 Page 10
PART III — DISTRICT BUDGET
Direct Costs Total
Section 29 Storm Drain and Basin Maintenance $ 100,000.00 $ 100,000.00
Administration
City Administration Overhead $ 18,142.00
Professional fees for Administration 3,179.51
County Administration Fee 460.69
$ 21,782.20
RESERVE FUND /CIP FUND $ 161,752.76
BALANCE TO LEVY (1) $ 283,534.96
Parcels Levied 785
Total EBU's (Gross Acres) 453.66
FY 2025/2026 MAXIMUM LEVY PER EBU $ 756.64
FY 2025/2026 LEVY PER EBU $ 625.00
FY 2024/2025 MAXIMUM LEVY PER EBU $ 734.60
FY 2024/2025 LEVY PER EBU $ 574.02
Estimated Beginning Reserve Balance - June 30, 2025 $ 125,000.00 Reserve Fund Adjustments 0.00
Estimated Ending Reserve Balance - June 30, 2026 $ 125,000.00 Beginning CIP Fund Balance - June 30, 2025 $ 681,439.70 CIP Fund Adjustments 161,752.76
Estimated CIP Balance - June 30, 2026 $ 843,192.46
(1) Slight variance from Charge total sum on Assessment Roll due to rounding. 317
2025/2026 Benefit Assessment District No. 1 Page 11
PART IV — DISTRICT DIAGRAMS
The parcels within Benefit Assessment District No. 1, Parcel Map No. 24255 (Monterey 170) / Assessment District 2004-02 (Section 29) consist of lots, parcels and subdivisions of land located in the planned residential and commercial development known as Section 29 and Monterey 170. The District covers approximately four hundred sixty acres (460 acres) in the City of Palm Desert.
The following District Diagram is based on the Riverside County Assessor’s Maps and the Riverside County Assessor’s information and identifies all the parcels of land within the proposed District, as the same existed at the time this Report was prepared. The combination of this map and the Assessment Roll contained in this Report constitutes the District Assessment Diagram.
318
2025/2026 Benefit Assessment District No. 1 Page 12
Dick Kelly Drive
319
2025/2026 Benefit Assessment District No. 1 Page 13
PART V — ASSESSMENT ROLL
Parcel identification for each lot or parcel within the District is based on the Assessment Diagram presented herein and is based on available parcel maps and property data from the Riverside County Assessor’s Office at the time the Engineer’s Report was prepared.
A listing of the proposed lots and parcels to be assessed within this District along with the assessment amounts is provided herein.
Non-assessable lots or parcels may include, but are not limited to, public streets and other roadways (typically not assigned an APN by the County); dedicated public easements, open space areas, right-of-ways, common areas; bifurcated lots, and any other property that cannot be developed or has little or no value. These types of parcels are considered to receive little or no benefit from the improvements and are therefore exempted from assessment.
If any parcel submitted for collection is identified by the County Auditor-Controller to be an invalid parcel number for the fiscal year, a corrected parcel number and/or new parcel numbers will be identified and resubmitted to the County Auditor-Controller. The assessment amount to be levied and collected for the resubmitted parcel or parcels shall be based on the method of apportionment and assessment rate described in this Report as approved by the City Council. Therefore, if a single parcel is subdivided to multiple parcels, the assessment amount applied to each of the new parcels shall be recalculated and applied according to the approved method of apportionment and assessment rate rather than a proportionate share of the original assessment. 320
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
694-060-013 73550 DINAH SHORE DR COM 3.61 $2,731.47 $2,256.24 694-060-014 73600 DINAH SHORE DR COM 11.42 8,640.83 7,137.50 694-060-017 73760 DINAH SHORE DR COM 1.04 786.91 650.00 694-060-026 73750 DINAH SHORE DR COM 3.43 2,595.28 2,143.74 694-060-031 73650 DINAH SHORE DR COM 1.87 1,414.92 1,168.74 694-060-037 73450 DINAH SHORE COM 6.58 4,978.69 4,112.50 694-061-001 73700 DINAH SHORE DR ##101 COM 0.17 131.88 108.92 694-061-002 73700 DINAH SHORE DR ##102 COM 0.17 131.88 108.92 694-061-003 73700 DINAH SHORE DR ##103 COM 0.17 131.88 108.92 694-061-004 73700 DINAH SHORE DR ##104 COM 0.17 131.88 108.92 694-061-005 73700 DINAH SHORE DR ##105 COM 0.17 131.88 108.92 694-061-006 73700 DINAH SHORE DR ##106 COM 0.17 131.88 108.92 694-061-007 73700 DINAH SHORE DR ##107 COM 0.17 131.88 108.92 694-061-008 73700 DINAH SHORE DR ##201 COM 0.17 131.88 108.92 694-061-009 73700 DINAH SHORE DR ##202 COM 0.17 131.88 108.92 694-061-010 73700 DINAH SHORE DR ##203 COM 0.17 131.88 108.92 694-061-011 73700 DINAH SHORE DR ##204 COM 0.17 131.88 108.92 694-061-012 73700 DINAH SHORE DR ##205 COM 0.17 131.88 108.92 694-061-013 73700 DINAH SHORE DR ##206 COM 0.17 131.88 108.92 694-061-014 73700 DINAH SHORE DR ##207 COM 0.17 131.88 108.92 694-061-015 73700 DINAH SHORE DR ##301 COM 0.17 131.88 108.92 694-061-016 73700 DINAH SHORE DR ##302 COM 0.17 131.88 108.92 694-061-017 73700 DINAH SHORE DR ##303 COM 0.17 131.88 108.92 694-061-018 73700 DINAH SHORE DR ##304 COM 0.17 131.88 108.92 694-061-019 73700 DINAH SHORE DR ##305 COM 0.17 131.88 108.92 694-061-020 73700 DINAH SHORE DR ##306 COM 0.17 131.88 108.92 694-061-021 73700 DINAH SHORE DR ##307 COM 0.17 131.88 108.92 694-061-022 73700 DINAH SHORE DR ##401 COM 0.17 131.88 108.92 694-061-023 73700 DINAH SHORE DR ##402 COM 0.17 131.88 108.92 694-061-024 73700 DINAH SHORE DR ##403 COM 0.17 131.88 108.92 694-061-025 73700 DINAH SHORE DR ##404 COM 0.17 131.88 108.92 694-061-026 73700 DINAH SHORE DR ##405 COM 0.17 131.88 108.92 694-061-027 73700 DINAH SHORE DR ##406 COM 0.17 131.88 108.92 694-061-028 73700 DINAH SHORE DR ##407 COM 0.17 131.88 108.92 694-061-030 73660 DINAH SHORE DR ##101 CON 0.06 46.48 38.38 694-061-031 73660 DINAH SHORE DR ##102 CON 0.06 46.48 38.38 694-061-032 73660 DINAH SHORE DR ##103 CON 0.06 46.48 38.38 694-061-033 73660 DINAH SHORE DR ##104 CON 0.06 46.48 38.38 694-061-034 73660 DINAH SHORE DR ##105 CON 0.06 46.48 38.38 694-061-035 73660 DINAH SHORE DR ##106 CON 0.06 46.48 38.38 694-061-036 73660 DINAH SHORE DR ##107 CON 0.06 46.48 38.38 694-061-037 73660 DINAH SHORE DR ##108 CON 0.06 46.48 38.38 694-061-038 73660 DINAH SHORE DR ##109 CON 0.06 46.48 38.38 694-061-039 73660 DINAH SHORE DR ##110 CON 0.06 46.48 38.38 694-061-040 73660 DINAH SHORE DR ##111 CON 0.06 46.48 38.38 694-061-041 73660 DINAH SHORE DR ##112 CON 0.06 46.48 38.38 694-061-042 73660 DINAH SHORE DR ##113 CON 0.06 46.48 38.38 694-061-043 73660 DINAH SHORE DR ##114 CON 0.06 46.48 38.38 City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
321
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-061-044 73660 DINAH SHORE DR CON 0.06 46.48 38.38
694-061-045 73660 DINAH SHORE DR ##116 CON 0.06 46.48 38.38 694-061-046 73660 DINAH SHORE DR ##117 CON 0.06 46.48 38.38 694-061-047 73660 DINAH SHORE DR ##218 CON 0.06 46.48 38.38 694-061-048 73660 DINAH SHORE DR ##219 CON 0.06 46.48 38.38 694-061-049 73660 DINAH SHORE DR ##220 CON 0.06 46.48 38.38 694-061-050 73660 DINAH SHORE DR ##221 CON 0.06 46.48 38.38 694-061-051 73660 DINAH SHORE DR ##222 CON 0.06 46.48 38.38 694-061-052 73660 DINAH SHORE DR ##223 CON 0.06 46.48 38.38 694-061-053 73660 DINAH SHORE DR ##224 CON 0.06 46.48 38.38 694-061-054 73660 DINAH SHORE DR ##225 CON 0.06 46.48 38.38 694-061-055 73660 DINAH SHORE DR ##226 CON 0.06 46.48 38.38 694-061-056 73660 DINAH SHORE DR ##227 CON 0.06 46.48 38.38 694-061-057 73660 DINAH SHORE DR ##228 CON 0.06 46.48 38.38 694-061-058 73660 DINAH SHORE DR ##229 CON 0.06 46.48 38.38 694-061-059 73660 DINAH SHORE DR ##230 CON 0.06 46.48 38.38 694-061-060 73660 DINAH SHORE DR ##231 CON 0.06 46.48 38.38 694-061-061 73660 DINAH SHORE DR ##232 CON 0.06 46.48 38.38 694-061-062 73660 DINAH SHORE DR ##233 CON 0.06 46.48 38.38 694-061-063 73660 DINAH SHORE DR ##234 CON 0.06 46.48 38.38 694-061-064 73660 DINAH SHORE DR ##235 CON 0.06 46.48 38.38 694-061-065 73660 DINAH SHORE DR ##236 CON 0.06 46.48 38.38 694-061-066 73660 DINAH SHORE DR ##237 CON 0.06 46.48 38.38 694-061-067 73660 DINAH SHORE DR ##238 CON 0.06 46.48 38.38 694-061-068 73660 DINAH SHORE DR ##239 CON 0.06 46.48 38.38 694-061-069 73660 DINAH SHORE DR ##240 CON 0.06 46.48 38.38 694-061-070 73660 DINAH SHORE DR ##241 CON 0.06 46.48 38.38 694-061-071 73660 DINAH SHORE DR ##242 CON 0.06 46.48 38.38 694-061-072 73660 DINAH SHORE DR ##243 CON 0.06 46.48 38.38 694-061-073 73660 DINAH SHORE DR ##244 CON 0.06 46.48 38.38 694-061-074 73660 DINAH SHORE DR ##245 CON 0.06 46.48 38.38 694-061-075 73660 DINAH SHORE DR ##246 CON 0.06 46.48 38.38 694-061-076 73660 DINAH SHORE DR ##247 CON 0.06 46.48 38.38 694-061-077 73660 DINAH SHORE DR ##248 CON 0.06 46.48 38.38 694-061-078 73660 DINAH SHORE DR ##249 CON 0.06 46.48 38.38 694-080-005 73820 DINAH SHORE DR COM 0.40 302.66 250.00 694-080-006 73800 DINAH SHORE DR COM 1.36 1,029.03 850.00 694-080-007 73818 DINAH SHORE DR COM 0.33 249.69 206.24 694-080-008 73814 DINAH SHORE DR COM 0.33 249.69 206.24 694-080-009 73810 DINAH SHORE DR COM 0.33 249.69 206.24 694-080-010 73808 DINAH SHORE DR COM 0.39 295.09 243.74 694-080-011 73806 DINAH SHORE DR COM 0.52 393.45 325.00 694-080-012 73812 DINAH SHORE DR COM 0.38 287.52 237.50 694-080-013 73816 DINAH SHORE DR COM 0.40 302.66 250.00 694-080-014 73802 DINAH SHORE DR COM 0.33 249.69 206.24 694-080-015 73804 DINAH SHORE DR COM 0.63 476.68 393.74 694-081-001 73850 DINAH SHORE DR ##101 COM 0.15 113.50 93.74 694-081-002 73850 DINAH SHORE DR ##102 COM 0.10 75.66 62.50 322
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-081-003 73850 DINAH SHORE DR ##103 COM 0.11 83.23 68.74 694-081-004 73850 DINAH SHORE DR ##104 COM 0.10 75.66 62.50 694-081-005 73850 DINAH SHORE DR ##105 COM 0.11 83.23 68.74 694-081-006 73850 DINAH SHORE DR ##106 COM 0.12 90.80 75.00 694-081-007 73850 DINAH SHORE DR ##107 COM 0.13 98.36 81.24 694-081-008 73850 DINAH SHORE DR ##108 COM 0.14 105.93 87.50 694-081-009 73850 DINAH SHORE DR ##109 COM 0.19 143.76 118.74 694-081-010 73850 DINAH SHORE DR ##110 COM 0.15 113.50 93.74 694-081-011 73850 DINAH SHORE DR ##111 COM 0.15 113.50 93.74 694-081-012 73850 DINAH SHORE DR ##112 COM 0.15 113.50 93.74 694-081-013 73850 DINAH SHORE DR ##113 COM 0.14 105.93 87.50 694-081-014 73850 DINAH SHORE DR ##114 COM 0.14 105.93 87.50 694-081-015 73850 DINAH SHORE DR ##115 COM 0.27 204.29 168.74 694-081-016 73900 DINAH SHORE DR ##201 COM 0.13 98.36 81.24 694-081-017 73900 DINAH SHORE DR ##202 COM 0.08 60.53 50.00 694-081-018 73900 DINAH SHORE DR ##203 COM 0.08 60.53 50.00 694-081-019 73900 DINAH SHORE DR ##204 COM 0.08 60.53 50.00 694-081-020 73900 DINAH SHORE DR ##205 COM 0.09 68.10 56.24 694-081-021 73900 DINAH SHORE DR ##206 COM 0.08 60.53 50.00 694-081-022 73900 DINAH SHORE DR ##207 COM 0.08 60.53 50.00 694-081-023 73900 DINAH SHORE DR ##208 COM 0.09 68.10 56.24 694-081-024 73900 DINAH SHORE DR ##209 COM 0.09 68.10 56.24 694-081-025 73950 DINAH SHORE DR ##301 COM 0.12 90.80 75.00 694-081-026 73950 DINAH SHORE DR ##302 COM 0.08 60.53 50.00 694-081-027 73950 DINAH SHORE DR ##303 COM 0.10 75.66 62.50 694-081-028 73950 DINAH SHORE DR ##304 COM 0.11 83.23 68.74 694-081-029 73950 DINAH SHORE DR ##305 COM 0.12 90.80 75.00 694-081-030 73950 DINAH SHORE DR ##306 COM 0.13 98.36 81.24 694-081-031 73950 DINAH SHORE DR ##307 COM 0.13 98.36 81.24 694-081-032 73950 DINAH SHORE DR ##308 COM 0.21 158.89 131.24 694-081-033 74000 DINAH SHORE DR ##401 COM 0.07 52.96 43.74 694-081-034 74000 DINAH SHORE DR ##402 COM 0.07 52.96 43.74 694-081-035 74000 DINAH SHORE DR ##403 COM 0.07 52.96 43.74 694-081-036 74000 DINAH SHORE DR ##404 COM 0.07 52.96 43.74 694-081-037 74000 DINAH SHORE DR ##405 COM 0.07 52.96 43.74 694-081-038 74000 DINAH SHORE DR ##406 COM 0.07 52.96 43.74 694-081-039 74000 DINAH SHORE DR ##407 COM 0.07 52.96 43.74 694-081-040 74000 DINAH SHORE DR ##408 COM 0.07 52.96 43.74 694-081-041 74000 DINAH SHORE DR ##409 COM 0.06 45.40 37.50 694-081-042 74000 DINAH SHORE DR ##410 COM 0.07 52.96 43.74 694-081-043 74000 DINAH SHORE DR ##411 COM 0.07 52.96 43.74 694-081-044 74000 DINAH SHORE DR ##412 COM 0.07 52.96 43.74 694-081-045 74000 DINAH SHORE DR ##413 COM 0.07 52.96 43.74 694-081-046 74000 DINAH SHORE DR ##414 COM 0.09 68.10 56.24 694-090-001 34550 MONTEREY AVE COM 12.81 9,692.56 8,006.24 694-090-006 34700 MONTEREY AVE COM 1.36 1,029.03 850.00 694-090-007 34620 MONTEREY AVE COM 0.82 620.44 512.50
694-090-008 34580 MONTEREY AVE COM 1.00 756.64 625.00
323
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-090-009 34540 MONTEREY AVE COM 1.22 923.10 762.50
694-090-010 34460 MONTEREY AVE ##103 COM 0.43 325.36 268.74 694-090-011 34220 MONTEREY AVE COM 15.20 11,500.93 9,500.00 694-090-012 34500 MONTEREY AVE COM 9.21 6,968.65 5,756.24 694-090-013 34460 MONTEREY AVE CMV 0.93 703.68 581.24
694-090-014 34420 MONTEREY AVE COM 0.93 703.68 581.24
694-090-015 34380 MONTEREY AVE COM 1.30 983.63 812.50
694-090-016 34340 MONTEREY AVE COM 1.01 764.21 631.24
694-090-017 34300 MONTEREY AVE COM 1.21 915.53 756.24
694-090-021 34140 MONTEREY AVE COM 1.43 1,082.00 893.74 694-090-022 34200 MONTEREY AVE COM 2.17 1,641.91 1,356.24 694-090-023 34500 MONTEREY AVE CMV 0.50 378.32 312.50
694-090-024 NO SITUS AVAILABLE CMV 1.98 1,498.15 1,237.50 694-090-027 34740 MONTEREY AVE COM 3.02 2,285.05 1,887.50 694-090-028 34900 MONTEREY AVE COM 2.81 2,126.16 1,756.24 694-090-029 34860 MONTEREY AVE COM 1.72 1,301.42 1,075.00 694-090-031 34660 MONTEREY AVE COM 2.39 1,808.37 1,493.74 694-090-032 34940 MONTEREY AVE COM 8.26 6,249.85 5,162.50 694-090-040 34260 MONTEREY AVE COM 1.00 756.64 625.00
694-090-041 34180 MONTEREY AVE COM 0.96 726.37 600.00
694-090-042 34100 MONTEREY AVE COM 1.29 976.07 806.24
694-130-016 NO SITUS AVAILABLE CMV 14.62 11,062.08 9,137.50 694-130-017 NO SITUS AVAILABLE CMV 11.16 8,444.10 6,975.00 694-130-018 NO SITUS AVAILABLE CMV 3.75 2,837.40 2,343.74 694-130-021 NO SITUS AVAILABLE CMV 26.41 19,982.86 16,506.24 694-130-022 35900 MONTEREY AVE COM 22.25 16,835.24 13,906.24 694-140-001 35476 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-002 35462 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-003 35448 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-004 35434 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-005 35420 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-006 35406 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-007 35392 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-008 35378 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-009 35364 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-010 35350 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-011 73640 CIERRA ST SFV 0.22 166.46 137.50
694-140-012 73626 CIERRA ST SFV 0.22 166.46 137.50
694-140-013 73612 CIERRA ST SFV 0.22 166.46 137.50
694-140-014 73598 CIERRA ST SFV 0.22 166.46 137.50
694-140-015 73584 CIERRA ST SFV 0.22 166.46 137.50
694-140-016 73570 CIERRA ST SFV 0.22 166.46 137.50
694-140-017 73556 CIERRA ST SFV 0.22 166.46 137.50
694-140-018 73542 CIERRA ST SFV 0.22 166.46 137.50
694-140-019 73528 CIERRA ST SFV 0.22 166.46 137.50
694-140-020 73514 CIERRA ST SFV 0.22 166.46 137.50
694-140-021 73500 CIERRA ST SFV 0.22 166.46 137.50
694-140-022 73486 CIERRA ST SFV 0.22 166.46 137.50
324
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-140-023 73472 CIERRA ST SFV 0.22 166.46 137.50
694-140-026 73430 CIERRA ST SFV 0.22 166.46 137.50
694-140-027 35375 DOMANI DR SFV 0.22 166.46 137.50
694-140-028 35383 DOMANI DR SFV 0.22 166.46 137.50
694-140-029 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-030 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-031 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-032 35439 DOMANI DR SFV 0.22 166.46 137.50
694-140-033 35453 DOMANI DR SFV 0.22 166.46 137.50
694-140-034 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-035 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-036 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-037 35432 DOMANI DR SFV 0.22 166.46 137.50
694-140-038 35446 DOMANI DR SFV 0.22 166.46 137.50
694-140-039 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-040 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-041 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-042 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-043 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-044 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-045 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-046 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-047 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-048 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-049 35414 SERENO LN SFR 0.22 166.46 137.50
694-140-050 35428 SERENO LN SFR 0.22 166.46 137.50
694-140-051 35442 SERENO LN SFR 0.22 166.46 137.50
694-140-052 35456 SERENO LN SFR 0.22 166.46 137.50
694-140-053 35515 BAINS AVE SFV 0.22 166.46 137.50
694-140-054 35501 BAINS AVE SFV 0.22 166.46 137.50
694-140-055 35487 BAINS AVE SFV 0.22 166.46 137.50
694-140-056 35473 BAINS AVE SFV 0.22 166.46 137.50
694-140-057 35459 BAINS AVE SFV 0.22 166.46 137.50
694-140-058 35445 BAINS AVE SFV 0.22 166.46 137.50
694-140-059 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-060 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-061 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-062 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-063 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-064 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-065 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-066 NO SITUS AVAILABLE SFV 0.22 166.46 137.50
694-140-067 35452 BAINS AVE SFV 0.22 166.46 137.50
694-140-068 35466 BAINS AVE SFV 0.22 166.46 137.50
694-140-069 35480 BAINS AVE SFV 0.22 166.46 137.50
694-140-070 35483 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-071 35469 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-072 35455 CORTESIA WAY SFV 0.22 166.46 137.50
325
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-140-073 35441 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-074 35427 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-075 35413 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-076 35399 CORTESIA WAY SFV 0.22 166.46 137.50
694-140-090 73444 CIERRA ST SFR 0.22 166.46 137.50
694-140-091 73458 CIERRA ST SFR 0.22 166.46 137.50
694-150-001 35481 DOMANI DR SFR 0.22 166.46 137.50
694-150-002 35495 DOMANI DR SFR 0.22 166.46 137.50
694-150-003 35509 DOMANI DR SFR 0.22 166.46 137.50
694-150-004 35523 DOMANI DR SFR 0.22 166.46 137.50
694-150-005 35537 DOMANI DR SFR 0.22 166.46 137.50
694-150-006 35551 DOMANI DR SFR 0.22 166.46 137.50
694-150-007 35565 DOMANI DR SFR 0.22 166.46 137.50
694-150-008 35579 DOMANI DR SFR 0.22 166.46 137.50
694-150-009 35593 DOMANI DR SFR 0.22 166.46 137.50
694-150-010 73435 TRAVERS ST SFR 0.22 166.46 137.50
694-150-011 73441 TRAVERS ST SFR 0.22 166.46 137.50
694-150-012 73447 TRAVERS ST SFR 0.22 166.46 137.50
694-150-013 73453 TRAVERS ST SFR 0.22 166.46 137.50
694-150-014 73467 TRAVERS ST SFR 0.22 166.46 137.50
694-150-015 73481 TRAVERS ST SFV 0.22 166.46 137.50
694-150-016 73495 TRAVERS ST SFV 0.22 166.46 137.50
694-150-017 73509 TRAVERS ST SFV 0.22 166.46 137.50
694-150-018 73523 TRAVERS ST SFV 0.22 166.46 137.50
694-150-019 73537 TRAVERS ST SFV 0.22 166.46 137.50
694-150-020 73551 TRAVERS ST SFV 0.22 166.46 137.50
694-150-021 73565 TRAVERS ST SFV 0.22 166.46 137.50
694-150-022 73579 TRAVERS ST SFV 0.22 166.46 137.50
694-150-023 73593 TRAVERS ST SFV 0.22 166.46 137.50
694-150-024 73607 TRAVERS ST SFV 0.22 166.46 137.50
694-150-025 73621 TRAVERS ST SFV 0.22 166.46 137.50
694-150-026 73635 TRAVERS ST SFV 0.22 166.46 137.50
694-150-029 35630 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-030 35616 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-031 35602 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-032 35588 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-033 35574 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-034 35560 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-035 35546 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-036 35532 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-037 35518 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-038 35504 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-039 35490 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-040 35474 DOMANI DR SFR 0.22 166.46 137.50
694-150-041 35488 DOMANI DR SFR 0.22 166.46 137.50
694-150-042 35502 DOMANI DR SFR 0.22 166.46 137.50
694-150-043 35516 DOMANI DR SFR 0.22 166.46 137.50
694-150-044 35530 DOMANI DR SFR 0.22 166.46 137.50
326
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-150-045 35544 DOMANI DR SFR 0.22 166.46 137.50
694-150-046 35572 DOMANI DR SFR 0.22 166.46 137.50
694-150-047 35586 DOMANI DR SFR 0.22 166.46 137.50
694-150-048 73474 TRAVERS ST SFR 0.22 166.46 137.50
694-150-049 73488 TRAVERS ST SFV 0.22 166.46 137.50
694-150-050 73502 TRAVERS ST SFV 0.22 166.46 137.50
694-150-051 73516 TRAVERS ST SFV 0.22 166.46 137.50
694-150-052 73530 TRAVERS ST SFV 0.22 166.46 137.50
694-150-053 73544 TRAVERS ST SFV 0.22 166.46 137.50
694-150-054 73558 TRAVERS ST SFV 0.22 166.46 137.50
694-150-055 73572 TRAVERS ST SFV 0.22 166.46 137.50
694-150-056 73586 TRAVERS ST SFV 0.22 166.46 137.50
694-150-057 73600 TRAVERS ST SFV 0.22 166.46 137.50
694-150-058 73614 TRAVERS ST SFV 0.22 166.46 137.50
694-150-059 73628 TRAVERS ST SFV 0.22 166.46 137.50
694-150-060 73642 TRAVERS ST SFV 0.22 166.46 137.50
694-150-061 73645 GRANITA DR SFV 0.22 166.46 137.50
694-150-062 73631 GRANITA DR SFV 0.22 166.46 137.50
694-150-063 73617 GRANITA DR SFV 0.22 166.46 137.50
694-150-064 73603 GRANITA DR SFV 0.22 166.46 137.50
694-150-065 73589 GRANITA DR SFV 0.22 166.46 137.50
694-150-066 73575 GRANITA DR SFV 0.22 166.46 137.50
694-150-067 73561 GRANITA DR SFV 0.22 166.46 137.50
694-150-068 73547 GRANITA DR SFV 0.22 166.46 137.50
694-150-069 73533 GRANITA DR SFV 0.22 166.46 137.50
694-150-070 73519 GRANITA DR SFV 0.22 166.46 137.50
694-150-071 35533 SERENO LN SFV 0.22 166.46 137.50
694-150-072 35519 SERENO LN SFV 0.22 166.46 137.50
694-150-073 35505 SERENO LN SFV 0.22 166.46 137.50
694-150-074 35491 SERENO LN SFV 0.22 166.46 137.50
694-150-075 35477 SERENO LN SFV 0.22 166.46 137.50
694-150-076 35494 BAINS AVE SFV 0.22 166.46 137.50
694-150-077 35508 BAINS AVE SFV 0.22 166.46 137.50
694-150-078 35522 BAINS AVE SFV 0.22 166.46 137.50
694-150-079 35536 BAINS AVE SFV 0.22 166.46 137.50
694-150-080 35539 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-081 35525 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-082 35511 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-083 35497 CORTESIA WAY SFV 0.22 166.46 137.50
694-150-090 35638 CORTESIA WAY SFR 0.22 166.46 137.50
694-150-091 35638 CORTESIA WAY SFR 0.22 166.46 137.50
694-240-001 34550 SPYDER CIR COM 0.66 499.38 412.50
694-240-002 NO SITUS AVAILABLE CMV 0.52 393.45 325.00
694-240-003 34750 SPYDER CIR COM 0.50 378.32 312.50
694-240-004 NO SITUS AVAILABLE CMV 0.50 378.32 312.50
694-240-005 NO SITUS AVAILABLE CMV 0.50 378.32 312.50
694-240-007 73725 DINAH SHORE DR CMV 1.30 983.63 812.50 694-240-008 73771 DINAH SHORE DR COM 2.13 1,611.64 1,331.24 327
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-240-011 NO SITUS AVAILABLE CMV 0.50 378.32 312.50
694-240-012 NO SITUS AVAILABLE CMV 0.50 378.32 312.50
694-240-013 NO SITUS AVAILABLE CMV 0.56 423.72 350.00
694-240-014 NO SITUS AVAILABLE CMV 1.01 764.21 631.24
694-240-015 34901 SPYDER CIR COM 0.56 423.72 350.00
694-240-016 34801 SPYDER CIR COM 0.50 378.32 312.50
694-240-017 NO SITUS AVAILABLE CMV 0.50 378.32 312.50
694-240-018 NO SITUS AVAILABLE CMV 0.50 378.32 312.50
694-240-019 NO SITUS AVAILABLE CMV 0.62 469.12 387.50
694-240-020 NO SITUS AVAILABLE CMV 1.02 771.77 637.50
694-240-021 NO SITUS AVAILABLE CMV 0.94 711.24 587.50
694-240-022 73605 DINAH SHORE DR ##100A COM 1.00 756.64 625.00 694-240-023 73605 DINAH SHORE DR ##200B COM 0.59 446.42 368.74 694-240-024 73605 DINAH SHORE DR ##300C COM 0.47 355.62 293.74 694-240-025 73605 DINAH SHORE DR ##400D COM 0.99 749.07 618.74 694-240-026 73605 DINAH SHORE DR ##500E COM 0.56 423.72 350.00 694-240-027 73605 DINAH SHORE DR ##600F COM 0.46 348.05 287.50 694-240-028 73605 DINAH SHORE DR ##700G COM 0.43 325.36 268.74 694-240-029 73605 DINAH SHORE DR ##800H COM 0.55 416.15 343.74 694-240-030 73605 DINAH SHORE DR ##900I COM 0.62 469.12 387.50 694-240-031 73605 DINAH SHORE DR ##1000 COM 0.80 605.31 500.00 694-240-032 73605 DINAH SHORE DR ##1100 COM 0.81 612.88 506.24 694-240-033 73605 DINAH SHORE DR ##1200 COM 1.19 900.40 743.74 694-240-034 73605 DINAH SHORE DR ##1500 COM 0.54 408.59 337.50 694-240-035 73605 DINAH SHORE DR ##1600 COM 0.54 408.59 337.50 694-240-047 73750 SPYDER CIR COM 0.61 461.55 381.24
694-240-048 73760 SPYDER CIR COM 0.61 461.55 381.24
694-240-068 NO SITUS AVAILABLE CMV 1.06 802.04 662.50
694-241-001 73605 DINAH SHORE DR ##1400 COM 0.23 174.03 143.74 694-241-002 73605 DINAH SHORE DR ##1400 COM 0.20 151.33 125.00 694-241-003 73605 DINAH SHORE DR ##1401 COM 0.20 151.33 125.00 694-241-004 73605 DINAH SHORE DR ##1400 COM 0.23 174.03 143.74 694-241-006 73605 DINAH SHORE DR ##1320 COM 0.31 234.56 193.74 694-241-007 73605 DINAH SHORE DR ##1310 COM 0.14 105.93 87.50 694-241-008 73605 DINAH SHORE DR ##1300 COM 0.14 105.93 87.50 694-241-010 34390 GATEWAY DR ##A-100 COM 0.75 566.36 467.82 694-241-011 34360 GATEWAY DR ##B-100 COM 0.30 226.54 187.12 694-241-012 34330 GATEWAY DR ##C-100 COM 0.38 289.49 239.12 694-241-013 34330 GATEWAY DR ##C-110 COM 0.38 289.49 239.12 694-241-014 34300 GATEWAY DR ##D-100 COM 0.29 217.08 179.30 694-241-015 34300 GATEWAY DR ##D-110 COM 0.26 193.02 159.42 694-241-016 34300 GATEWAY DR ##D-120 COM 0.29 217.08 179.30 694-241-017 34470 GATEWAY DR ##E-100 COM 0.29 217.08 179.30 694-241-018 34470 GATEWAY DR ##E-110 COM 0.29 217.08 179.30 694-241-019 34500 GATEWAY DR ##F-100 COM 0.26 193.02 159.42 694-241-020 34500 GATEWAY DR ##F-110 COM 0.19 144.75 119.56 694-241-021 34500 GATEWAY DR ##F-120 COM 0.26 193.02 159.42 694-241-022 34420 GATEWAY DR ##G-100 COM 1.91 1,447.45 1,195.62 328
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-241-023 34450 GATEWAY DR ##H-100 COM 1.82 1,375.04 1,135.80 694-241-024 34450 GATEWAY DR ##H-110 COM 1.75 1,326.84 1,096.00 694-250-001 73816 RIVERA CT SFR 0.34 254.49 210.20
694-250-002 73830 RIVERA CT SFR 0.34 254.49 210.20
694-250-003 73823 RIVERA CT SFR 0.34 254.49 210.20
694-250-007 35768 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-008 35782 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-009 73809 RIVERA CT SFR 0.34 254.49 210.20
694-250-010 35796 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-011 35810 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-012 35824 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-013 73812 DA VINCI CT SFR 0.34 254.49 210.20
694-250-014 73824 DA VINCI CT SFR 0.34 254.49 210.20
694-250-015 73861 DA VINCI CT SFR 0.34 254.49 210.20
694-250-016 73847 DA VINCI CT SFR 0.34 254.49 210.20
694-250-017 73833 DA VINCI CT SFR 0.34 254.49 210.20
694-250-018 73819 DA VINCI CT SFR 0.34 254.49 210.20
694-250-019 35838 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-020 35852 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-021 35866 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-022 35880 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-023 35887 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-024 35873 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-025 35859 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-026 35845 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-027 35831 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-028 35817 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-029 35803 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-030 35789 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-031 35775 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-032 35761 RAPHAEL DR SFR 0.34 254.49 210.20
694-250-033 73768 CEZANNE DR SFR 0.34 254.49 210.20
694-250-034 73782 CEZANNE DR SFR 0.34 254.49 210.20
694-250-035 73796 CEZANNE DR SFR 0.34 254.49 210.20
694-250-036 73810 CEZANNE DR SFR 0.34 254.49 210.20
694-250-037 73824 CEZANNE DR SFR 0.34 254.49 210.20
694-250-038 73838 CEZANNE DR SFR 0.34 254.49 210.20
694-250-039 73852 CEZANNE DR SFR 0.34 254.49 210.20
694-250-040 73866 CEZANNE DR SFR 0.34 254.49 210.20
694-250-041 73880 CEZANNE DR SFR 0.34 254.49 210.20
694-250-042 73845 CEZANNE DR SFR 0.34 254.49 210.20
694-250-043 73831 CEZANNE DR SFR 0.34 254.49 210.20
694-250-044 73817 CEZANNE DR SFR 0.34 254.49 210.20
694-250-045 73803 CEZANNE DR SFR 0.34 254.49 210.20
694-250-046 73789 CEZANNE DR SFR 0.34 254.49 210.20
694-250-047 73775 CEZANNE DR SFR 0.34 254.49 210.20
694-250-048 73761 CEZANNE DR SFR 0.34 254.49 210.20
694-250-049 73810 VAN GOGH DR SFR 0.34 254.49 210.20
329
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-250-050 73806 PICASSO DR SFR 0.34 254.49 210.20
694-250-051 73820 PICASSO DR SFR 0.34 254.49 210.20
694-250-052 35747 RAPHAEL DR SFR 0.34 254.49 210.20
694-260-001 73628 DALI CT SFR 0.34 254.49 210.20
694-260-002 35877 MATISSE DR SFR 0.34 254.49 210.20
694-260-003 35863 MATISSE DR SFR 0.34 254.49 210.20
694-260-004 73677 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-005 73663 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-006 73649 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-007 73635 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-008 35860 RENOIR PL SFR 0.34 254.49 210.20
694-260-009 35867 RENOIR PL SFR 0.34 254.49 210.20
694-260-010 35853 RENOIR PL SFR 0.34 254.49 210.20
694-260-011 35839 RENOIR PL SFR 0.34 254.49 210.20
694-260-012 35825 RENOIR PL SFR 0.34 254.49 210.20
694-260-013 35811 RENOIR PL SFR 0.34 254.49 210.20
694-260-014 73642 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-015 73656 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-016 73670 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-017 73684 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-018 73698 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-019 73712 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-020 73726 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-021 73740 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-022 73754 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-023 73768 KANDINSKY WAY SFR 0.34 254.49 210.20
694-260-024 73782 VAN GOGH DR SFR 0.34 254.49 210.20
694-260-025 73796 VAN GOGH DR SFR 0.34 254.49 210.20
694-260-026 73775 VAN GOGH DR SFR 0.34 254.49 210.20
694-260-027 73761 VAN GOGH DR SFR 0.34 254.49 210.20
694-260-028 35856 MATISSE DR SFR 0.34 254.49 210.20
694-260-029 35870 MATISSE DR SFR 0.34 254.49 210.20
694-260-030 73645 PICASSO DR SFR 0.34 254.49 210.20
694-260-031 73659 PICASSO DR SFR 0.34 254.49 210.20
694-260-032 73673 PICASSO DR SFR 0.34 254.49 210.20
694-260-033 73687 PICASSO DR SFR 0.34 254.49 210.20
694-260-034 73701 PICASSO DR SFR 0.34 254.49 210.20
694-260-035 73715 PICASSO DR SFR 0.34 254.49 210.20
694-260-036 73729 PICASSO DR SFR 0.34 254.49 210.20
694-260-037 73743 PICASSO DR SFR 0.34 254.49 210.20
694-260-038 73757 PICASSO DR SFR 0.34 254.49 210.20
694-260-039 73771 PICASSO DR SFR 0.34 254.49 210.20
694-260-040 73785 PICASSO DR SFR 0.34 254.49 210.20
694-260-041 73799 PICASSO DR SFR 0.34 254.49 210.20
694-260-042 73813 PICASSO DR SFR 0.34 254.49 210.20
694-260-043 73827 PICASSO DR SFR 0.34 254.49 210.20
694-260-049 73596 PICASSO DR SFR 0.35 267.35 220.82
694-260-050 73610 PICASSO DR SFR 0.35 267.35 220.82
330
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-260-051 73624 PICASSO DR SFR 0.35 267.35 220.82
694-260-052 73638 PICASSO DR SFR 0.35 267.35 220.82
694-260-053 73652 PICASSO DR SFR 0.35 267.35 220.82
694-260-054 73666 PICASSO DR SFR 0.35 267.35 220.82
694-260-055 73680 PICASSO DR SFR 0.35 267.35 220.82
694-260-056 73694 PICASSO DR SFR 0.35 267.35 220.82
694-260-057 73708 PICASSO DR SFR 0.35 267.35 220.82
694-260-058 73722 PICASSO DR SFR 0.35 267.35 220.82
694-260-059 73736 PICASSO DR SFR 0.35 267.35 220.82
694-260-060 73750 PICASSO DR SFR 0.35 267.35 220.82
694-260-061 73764 PICASSO DR SFR 0.35 267.35 220.82
694-260-062 73778 PICASSO DR SFR 0.35 267.35 220.82
694-260-063 73792 PICASSO DR SFR 0.35 267.35 220.82
694-260-072 35833 RENOIR PL SFR 0.34 254.49 210.20
694-270-002 35933 MATISSE DR SFR 0.36 269.06 222.24
694-270-003 35919 MATISSE DR SFR 0.36 269.06 222.24
694-270-004 35905 MATISSE DR SFR 0.36 269.06 222.24
694-270-005 35891 MATISSE DR SFR 0.36 269.06 222.24
694-270-006 73635 DALI CT SFR 0.36 269.06 222.24
694-270-007 73649 DALI CT SFR 0.36 269.06 222.24
694-270-008 73642 DALI CT SFR 0.36 269.06 222.24
694-270-009 35874 RENOIR PL SFR 0.36 269.06 222.24
694-270-010 35888 RENOIR PL SFR 0.36 269.06 222.24
694-270-011 35902 RENOIR PL SFR 0.36 269.06 222.24
694-270-012 35923 RENOIR PL SFR 0.36 269.06 222.24
694-270-013 35909 RENOIR PL SFR 0.36 269.06 222.24
694-270-014 35895 RENOIR PL SFR 0.36 269.06 222.24
694-270-015 35881 RENOIR PL SFR 0.36 269.06 222.24
694-270-016 73789 VAN GOGH DR SFR 0.36 269.06 222.24
694-270-017 35884 MATISSE DR SFR 0.36 269.06 222.24
694-270-018 35898 MATISSE DR SFR 0.36 269.06 222.24
694-270-019 35912 MATISSE DR SFR 0.36 269.06 222.24
694-270-020 35926 MATISSE DR SFR 0.36 269.06 222.24
694-270-026 35937 RENOIR PL SFR 0.37 278.30 229.86
694-270-027 35951 RENOIR PL SFR 0.37 278.30 229.86
694-270-028 35965 RENOIR PL SFR 0.37 278.30 229.86
694-270-029 35979 RENOIR PL SFR 0.37 278.30 229.86
694-270-030 35993 RENOIR PL SFR 0.37 278.30 229.86
694-270-031 73615 VERMEER WAY SFR 0.37 278.30 229.86
694-270-032 73629 VERMEER WAY SFR 0.37 278.30 229.86
694-270-033 73643 VERMEER WAY SFR 0.37 278.30 229.86
694-270-034 73657 VERMEER WAY SFR 0.37 278.30 229.86
694-270-035 73671 VERMEER WAY SFR 0.37 278.30 229.86
694-270-036 73685 VERMEER WAY SFR 0.37 278.30 229.86
694-270-037 73699 VERMEER WAY SFR 0.37 278.30 229.86
694-270-038 73713 VERMEER WAY SFR 0.37 278.30 229.86
694-270-039 73727 VERMEER WAY SFR 0.37 278.30 229.86
694-270-040 35996 CHAGALL LN SFV 0.37 278.30 229.86
331
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-270-041 35982 CHAGALL LN SFR 0.37 278.30 229.86
694-270-042 35968 CHAGALL LN SFR 0.37 278.30 229.86
694-270-043 35954 CHAGALL LN SFR 0.37 278.30 229.86
694-270-044 35940 CHAGALL LN SFR 0.37 278.30 229.86
694-270-045 73720 VERMEER WAY SFR 0.37 278.30 229.86
694-270-046 73706 VERMEER WAY SFR 0.37 278.30 229.86
694-270-047 73692 VERMEER WAY SFR 0.37 278.30 229.86
694-270-048 73678 VERMEER WAY SFR 0.37 278.30 229.86
694-270-049 73664 VERMEER WAY SFR 0.37 278.30 229.86
694-270-050 73650 VERMEER WAY SFR 0.37 278.30 229.86
694-270-051 73636 VERMEER WAY SFR 0.37 278.30 229.86
694-270-052 73622 VERMEER WAY SFR 0.37 278.30 229.86
694-270-053 73625 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-054 73639 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-055 73653 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-056 73667 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-057 73681 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-058 73695 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-059 73709 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-060 73723 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-061 73702 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-062 73688 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-063 73674 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-064 73660 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-065 73646 OKEEFFE WAY SFR 0.37 278.30 229.86
694-270-066 73632 OKEEFFE WAY SFR 0.37 278.30 229.86
694-280-002 35894 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-003 35908 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-004 35922 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-005 35936 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-006 35950 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-007 35943 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-008 35929 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-009 35915 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-010 35901 RAPHAEL DR SFR 0.36 269.06 222.24
694-280-011 73894 CEZANNE DR SFR 0.36 269.06 222.24
694-280-012 73908 CEZANNE DR SFR 0.36 269.06 222.24
694-280-013 73922 CEZANNE DR SFR 0.36 269.06 222.24
694-280-014 73936 CEZANNE DR SFR 0.36 269.06 222.24
694-280-018 73915 CEZANNE DR SFR 0.36 269.06 222.24
694-280-019 73901 CEZANNE DR SFR 0.36 269.06 222.24
694-280-020 73887 CEZANNE DR SFR 0.36 269.06 222.24
694-280-021 73873 CEZANNE DR SFR 0.36 269.06 222.24
694-280-022 73859 CEZANNE DR SFR 0.36 269.06 222.24
694-280-023 73824 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-024 73838 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-025 73852 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-026 73866 VAN GOGH DR SFR 0.36 269.06 222.24
332
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-280-027 73859 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-028 73845 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-029 73831 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-030 73817 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-031 73803 VAN GOGH DR SFR 0.36 269.06 222.24
694-280-032 73758 MONET DR SFR 0.36 269.06 222.24
694-280-033 73772 MONET DR SFR 0.36 269.06 222.24
694-280-034 73786 MONET DR SFR 0.36 269.06 222.24
694-280-035 73800 MONET DR SFR 0.36 269.06 222.24
694-280-036 73814 MONET DR SFR 0.36 269.06 222.24
694-280-047 73880 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-048 73894 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-049 73908 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-050 73922 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-051 73936 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-052 73828 MONET DR SFR 0.31 232.86 192.34
694-280-053 73842 MONET DR SFR 0.31 232.86 192.34
694-280-054 73901 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-055 73887 VAN GOGH DR SFR 0.31 232.86 192.34
694-280-056 73873 VAN GOGH DR SFR 0.31 232.86 192.34
694-431-001 34130 GATEWAY DR ##A100 COM 0.20 155.09 128.10 694-431-002 34130 GATEWAY DR ##A110 COM 0.20 155.09 128.10 694-431-003 34130 GATEWAY DR ##A120 COM 0.20 155.09 128.10 694-431-004 34130 GATEWAY DR ##A200 COM 0.20 155.09 128.10 694-431-005 34130 GATEWAY DR ##A210 COM 0.20 155.09 128.10 694-431-007 34100 GATEWAY DR ##B100 COM 0.14 103.16 85.20 694-431-008 34100 GATEWAY DR ##B110 COM 0.14 103.16 85.20 694-431-009 34100 GATEWAY DR ##B120 COM 0.14 103.16 85.20 694-431-010 34100 GATEWAY DR ##B130 COM 0.14 103.16 85.20 694-431-011 34100 GATEWAY DR ##B200 COM 0.14 103.16 85.20 694-431-012 34100 GATEWAY DR ##B210 COM 0.14 103.16 85.20 694-431-013 34100 GATEWAY DR ##B220 COM 0.14 103.16 85.20 694-431-014 34100 GATEWAY DR ##B230 COM 0.14 103.16 85.20 694-431-015 34100 GATEWAY DR ##B240 COM 0.14 103.16 85.20 694-431-017 34160 GATEWAY DR ##C100 COM 0.26 195.82 161.74 694-431-018 34160 GATEWAY DR ##C110 COM 0.26 195.82 161.74 694-431-019 34160 GATEWAY DR ##C120 COM 0.26 195.82 161.74 694-431-021 34190 GATEWAY DR ##D100 COM 0.30 227.16 187.62 694-431-022 34190 GATEWAY DR ##D110 COM 0.30 227.16 187.62 694-431-023 34190 GATEWAY DR ##D120 COM 0.30 227.16 187.62 694-431-025 34220 GATEWAY DR ##E100 COM 0.26 195.82 161.74 694-431-026 34220 GATEWAY DR ##E110 COM 0.26 195.82 161.74 694-431-027 34220 GATEWAY DR ##E120 COM 0.26 195.82 161.74 694-431-029 34250 GATEWAY DR ##F100 COM 0.31 234.99 194.10 694-431-030 34250 GATEWAY DR ##F110 COM 0.31 234.99 194.10 694-431-031 34250 GATEWAY DR ##F120 COM 0.31 234.99 194.10 694-431-032 34250 GATEWAY DR ##F130 COM 0.31 234.99 194.10 694-431-034 34280 GATEWAY DR ##G100 COM 0.37 278.07 229.68 333
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-431-035 34280 GATEWAY DR ##G110 COM 0.37 278.07 229.68 694-431-036 34280 GATEWAY DR ##G120 COM 0.37 278.07 229.68 694-440-001 73957 RUBENS LN SFR 0.36 269.06 222.24
694-440-002 73943 RUBENS LN SFR 0.36 269.06 222.24
694-440-003 73929 RUBENS LN SFR 0.36 269.06 222.24
694-440-004 73793 MONET DR SFR 0.36 269.06 222.24
694-440-005 73779 MONET DR SFR 0.36 269.06 222.24
694-440-006 73765 MONET DR SFR 0.36 269.06 222.24
694-440-007 73751 MONET DR SFR 0.36 269.06 222.24
694-440-010 73950 VAN GOGH DR SFR 0.31 232.86 192.34
694-440-011 73964 VAN GOGH DR SFR 0.31 232.86 192.34
694-440-012 73978 VAN GOGH DR SFR 0.31 232.86 192.34
694-440-013 73992 VAN GOGH DR SFR 0.31 232.86 192.34
694-440-014 73930 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-015 73944 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-016 73958 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-017 73972 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-018 73986 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-019 73993 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-020 73979 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-021 73965 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-022 73951 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-023 73937 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-024 73923 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-025 73909 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-026 73895 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-027 73881 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-028 73867 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-029 73853 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-030 73839 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-031 73825 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-032 73811 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-033 73797 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-034 73783 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-035 73769 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-036 73755 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-037 73741 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-038 73734 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-039 73748 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-040 73762 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-041 73776 MONDRIAN PL SFR 0.31 232.86 192.34
694-440-042 73821 MONET DR SFR 0.31 232.86 192.34
694-440-043 73807 MONET DR SFR 0.31 232.86 192.34
694-440-044 73856 MONET DR SFR 0.31 232.86 192.34
694-440-045 73870 MONET DR SFR 0.31 232.86 192.34
694-440-046 73943 VAN GOGH DR SFR 0.31 232.86 192.34
694-440-047 73929 VAN GOGH DR SFR 0.31 232.86 192.34
694-440-048 73915 VAN GOGH DR SFR 0.31 232.86 192.34
334
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-490-001 73298 WARHOL LN SFV 0.35 263.23 217.42
694-490-002 73312 WARHOL LN SFV 0.35 263.23 217.42
694-490-003 73326 WARHOL LN SFR 0.35 263.23 217.42
694-490-004 73340 WARHOL LN SFR 0.35 263.23 217.42
694-490-005 73354 WARHOL LN SFR 0.35 263.23 217.42
694-490-006 73368 WARHOL LN SFV 0.35 263.23 217.42
694-490-007 73382 WARHOL LN SFV 0.35 263.23 217.42
694-490-008 73396 WARHOL LN SFV 0.35 263.23 217.42
694-490-009 73410 WARHOL LN SFV 0.35 263.23 217.42
694-490-010 35565 PERUGINO TER SFV 0.35 263.23 217.42
694-490-011 35579 PERUGINO TER SFR 0.35 263.23 217.42
694-490-012 35593 PERUGINO TER SFR 0.35 263.23 217.42
694-490-013 35607 PERUGINO TER SFR 0.35 263.23 217.42
694-490-014 35621 PERUGINO TER SFR 0.35 263.23 217.42
694-490-015 35635 PERUGINO TER SFR 0.35 263.23 217.42
694-490-016 35649 PERUGINO TER SFR 0.35 263.23 217.42
694-490-017 35663 PERUGINO TER SFR 0.35 263.23 217.42
694-490-018 35677 PERUGINO TER SFR 0.35 263.23 217.42
694-490-019 35691 PERUGINO TER SFR 0.35 263.23 217.42
694-490-020 35705 PERUGINO TER SFR 0.35 263.23 217.42
694-490-021 35719 PERUGINO TER SFR 0.35 263.23 217.42
694-490-022 35733 PERUGINO TER SFR 0.35 263.23 217.42
694-490-023 35747 PERUGINO TER SFR 0.35 263.23 217.42
694-490-024 35738 PERUGINO TER SFR 0.35 263.23 217.42
694-490-025 35724 PERUGINO TER SFR 0.35 263.23 217.42
694-490-026 35710 PERUGINO TER SFR 0.35 263.23 217.42
694-490-027 35696 PERUGINO TER SFR 0.35 263.23 217.42
694-490-028 35682 PERUGINO TER SFR 0.35 263.23 217.42
694-490-029 35668 PERUGINO TER SFR 0.35 263.23 217.42
694-490-030 35654 PERUGINO TER SFR 0.35 263.23 217.42
694-490-031 35640 PERUGINO TER SFR 0.35 263.23 217.42
694-490-032 35626 PERUGINO TER SFR 0.35 263.23 217.42
694-490-033 35612 PERUGINO TER SFR 0.35 263.23 217.42
694-490-034 35598 PERUGINO TER SFR 0.35 263.23 217.42
694-490-035 35584 PERUGINO TER SFR 0.35 263.23 217.42
694-490-036 35570 PERUGINO TER SFV 0.35 263.23 217.42
694-490-037 35575 PASINI TER SFV 0.35 263.23 217.42
694-490-038 35589 PASINI TER SFR 0.35 263.23 217.42
694-490-039 35603 PASINI TER SFR 0.35 263.23 217.42
694-490-040 35617 PASINI TER SFR 0.35 263.23 217.42
694-490-041 35631 PASINI TER SFR 0.35 263.23 217.42
694-490-042 35645 PASINI TER SFR 0.35 263.23 217.42
694-490-043 35659 PASINI TER SFR 0.35 263.23 217.42
694-490-044 35673 PASINI TER SFR 0.35 263.23 217.42
694-490-045 35687 PASINI TER SFR 0.35 263.23 217.42
694-490-046 35701 PASINI TER SFR 0.35 263.23 217.42
694-490-047 35715 PASINI TER SFR 0.35 263.23 217.42
694-490-048 35729 PASINI TER SFR 0.35 263.23 217.42
335
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-490-049 35743 PASINI TER SFR 0.35 263.23 217.42
694-500-001 73458 HENRI DR SFV 0.35 263.23 217.42
694-500-002 73472 HENRI DR SFV 0.35 263.23 217.42
694-500-003 73486 HENRI DR SFV 0.35 263.23 217.42
694-500-004 73500 HENRI DR SFV 0.35 263.23 217.42
694-500-005 73514 HENRI DR SFV 0.35 263.23 217.42
694-500-006 73528 HENRI DR SFV 0.35 263.23 217.42
694-500-007 73542 HENRI DR SFV 0.35 263.23 217.42
694-500-008 73556 HENRI DR SFV 0.35 263.23 217.42
694-500-009 73570 HENRI DR SFV 0.35 263.23 217.42
694-500-010 73584 HENRI DR SFV 0.35 263.23 217.42
694-500-011 73598 HENRI DR SFV 0.35 263.23 217.42
694-500-012 73612 HENRI DR SFV 0.35 263.23 217.42
694-500-013 73626 HENRI DR SFV 0.35 263.23 217.42
694-500-014 73686 HENRI DR SFV 0.35 263.23 217.42
694-500-015 73700 HENRI DR SFV 0.35 263.23 217.42
694-500-016 73714 HENRI DR SFV 0.35 263.23 217.42
694-500-017 73711 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-018 73697 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-019 73683 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-020 73669 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-021 73655 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-022 73641 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-023 73627 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-024 73613 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-025 73609 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-026 73595 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-027 73581 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-028 73567 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-029 73553 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-030 73539 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-031 73525 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-032 73511 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-033 73497 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-034 73483 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-035 73469 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-036 73455 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-037 73452 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-038 73466 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-039 73480 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-040 73494 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-041 73508 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-042 73522 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-043 73536 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-044 73550 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-045 73564 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-046 73578 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-047 73592 RAPHAEL DR SFV 0.35 263.23 217.42
336
APN Situs Address Land Use Benefit Units Maximum Special Assessment Charge
City of Palm Desert
Benefit Assessment District No. 1
Final Prelim Report (Sorted by Assessor's Parcel Number "APN") Fiscal Year 2025/26
694-500-048 73606 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-049 73620 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-050 73634 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-051 73648 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-052 73676 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-053 73690 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-054 73704 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-055 73718 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-056 73732 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-057 73746 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-058 73760 RAPHAEL DR SFV 0.35 263.23 217.42
694-500-059 73801 HENRI DR SFV 0.35 263.23 217.42
694-500-060 73787 HENRI DR SFV 0.35 263.23 217.42
694-500-061 73773 HENRI DR SFV 0.35 263.23 217.42
694-510-001 NO SITUS AVAILABLE CMV 11.72 8,869.18 7,326.12 694-510-013 NO SITUS AVAILABLE CMV 20.36 15,405.19 12,725.00 694-510-014 NO SITUS AVAILABLE CMV 18.58 14,058.37 11,612.50 Summary Fields Value
APN Total: 785
EBU Total: 453.66
Max Sp Assess: $343,254.23
Charge Total: $283,528.42
337
338
CITY OF PALM DESERT
STAFF REPORT
MEETING DATE: May 8, 2025
PREPARED BY: Ivan Tenorio, Homeless and Supportive Services Manager SUBJECT: ADOPT AND APPROVE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) SUBSTANTIAL AMENDMENTS TO THE ANNUAL ACTION
PLANS FOR PROGRAM YEARS 2020(CV), 2021, 2022, 2023, AND 2024 RECOMMENDATION:
1. Conduct a public hearing, receive public testimony, and approve the Substantial Amendment to the PY 2020, 2021, 2022, 2023, and 2024 Annual Action Plans.
2. Adopt the Substantial Amendment to PY 2020 (CV) to reallocate $180,000 in remaining CDBG-CV funds to the Desert Arc HVAC Replacement Project, an eligible public facility upgrade.
3. Adopt the Substantial Amendment to PY 2021 to reallocate $59,723.44 in unspent funds to the PY 2024 for Palm Desert Housing Authority (PDHA) public infrastructure improvements.
4. Adopt the Substantial Amendment to PY 2022 to reallocate $32,467.73 in unspent funds to PY 2024 for PDHA public infrastructure improvements.
5. Adopt the Substantial Amendment to PY 2023 to reallocate $50,000 in unspent funds to The Joslyn Center for ADA bathroom improvements.
6. Adopt the Substantial Amendment to PY 2024 to allocate $110,000 in remaining funds to the City’s Housing Authority for PDHA public infrastructure improvements.
7. Authorize the Director of Finance to appropriate funds for the applicable CDBG Accounts, if necessary to implement the approved amendments.
BACKGROUND/ANALYSIS:
The City of Palm Desert receives annual Community Development Block Grant (CDBG) funding from the U.S. Department of Housing and Urban Development (HUD). Over time, it is not uncommon for projects to receive CDBG funding allocations but ultimately not use the full amount, whether due to cost savings, project scope changes, or external funding offsets. This can lead to a gradual build-up of unspent funds, requiring reallocation to ensure the funds are used effectively and in compliance with HUD’s timeliness requirements.
As of Program Years (PY) 2019–2024, the City has accumulated $449,198.11 in unspent CDBG and CDBG-CV funds. Most of these unspent funds stem from cost savings on completed projects.
Program Year Unspent Amount
2019 $5,596.38
2020 $8,784.90
2020 (CV) $181,441.64
2021 $59,723.44
2022 $32,467.73
339
City of Palm Desert
CDBG Amendments
Reallocation Strategy
In consultation with the City’s CDBG consultant and HUD representative, staff have developed a plan to reallocate these funds effectively and in compliance with federal guidelines for City Council consideration. According to the City’s Citizen Participation Plan, a Substantial Amendment is required when:
Reallocating $25,000 or more, or
Adding or removing a project.
Since PY 2019 and 2020 allocations fall below this threshold and do not change existing projects, they will be reallocated administratively.
REALLOCATION DETAILS BY PROGRAM YEAR
PY 2019 & PY 2020 Administrative Reallocations
Project: Public infrastructure improvements under the Palm Desert Housing Authority (PDHA), specifically parking lot resurfacing at the Candlewood property, benefitting low- to moderate-income residents. This same project is covered over the multiple reallocation years.
Amount: $14,381.28 (PY 2019: $5,596.38 and PY 2020: $8,784.90) PY 2020(CV) Substantial Amendment
Project: Desert Arc HVAC Replacement Project
Amount: $180,000 (reallocated from unspent CDBG-CV funds) Originally awarded $110,000 in PY 2024 CDBG funds, the HVAC replacement project was reallocated to CDBG-CV due to its alignment with COVID-19 public health goals, specifically improving air circulation and filtration. This shift qualifies under HUD’s coronavirus response criteria and allows the City to strategically utilize its remaining $181,441.64 in CDBG-CV funds. The project now receives $180,000 from CDBG-CV, nearly exhausting the balance and freeing up $110,000 in regular CDBG funds for other eligible uses.
PY 2021 Substantial Amendment
Project: Reallocate to PY 2024 for PDHA public infrastructure improvements Amount: $59,723.44
PY 2022 Substantial Amendment
Project: Reallocate to PY 2024 for PDHA public infrastructure improvements Amount: $32,467.73
PY 2023 Substantial Amendment
Project: Joslyn Center ADA Bathroom Project, enhancing accessibility for seniors, and 2023 $51,184.02
2024 $110,000.00
Total Available $449,198.11
340
City of Palm Desert
CDBG Amendments
PDHA public infrastructure improvements
Amount: $51,840.02 ($50,000 to the Joslyn Center, and $1,184.02 to PDHA) PY 2024 Substantial Amendment
Project: PDHA public infrastructure improvements
Amount: $217,756.47 (PY 2024: $110,000 and PY’s 2019-2023: $107,756.47) Summary of Reallocations
Community Impact
By reallocating unspent CDBG funds to the PDHA, directing additional resources to the Joslyn Center ADA Bathroom Project, and transitioning the Desert Arc HVAC Project to CDBG-CV funding, the City will fulfill CDBG requirements. These reallocations will improve public infrastructure, create safer community spaces, and enhance accessibility for vulnerable populations, including seniors and individuals with disabilities.
Public Review & Approval Process
The 30-day public review period for this Substantial Amendment will run from March 28, 2025, to April 27, 2025, alongside on the City’s website (www.palmdesert.gov/departments/specialprograms/community-development-block-grant-cdbg). A public hearing will be held on May 8, 2025, at 4:00 p.m. in the Palm Desert City Hall Council Chambers to consider final approval.
FINANCIAL IMPACT:
The reallocation of funds results in a net available balance of $1,441.64 in CDBG (CV) funds that may be used for another eligible purpose. Costs for CDBG projects are eligible for 100% reimbursement from HUD; therefore, this action has no impact on the General Fund.
ATTACHMENTS:
1. PD PY20 AAP SA4
2. PD PY21 AAP SA3
3. PD PY22 AAP SA1
4. PD PY23 AAP SA2
5. PD PY24 AAP SA1
6. CDBG Amendment Presentation
Source Project Reallocated Amount
CDBG-CV Desert Arc HVAC Project $180,000
CDBG Joslyn Center (ADA) $50,000
CDBG PDHA infrastructure $217,756.47
Combined Reallocation Request $447,756.47
341
342
Annual Action Plan
2020
1 OMB Control No: 2506-0117 (exp. 09/30/2021)
Substantial Amendment April 2025 to allocate all remaining resources ($180,000) from CV funding to Desert Arc for an eligible public facility upgrade.
Previous SA: This Action Plan Amendment increases funding for two existing activities by reprogramming CDBG funds from Program Year (PY) 2020 and unprogrammed funds from PY 2018. The substantial amendment includes a -$62 adjustment per HUD.3-29-23 - The purpose of this Substantial Amendment #2 to the City of Palm Desert's FY 2020-21 Annual Action Plan is to reallocate $142,490 from Palma Village Sidewalk Improvement project to Palma Village Park Improvement project. The Palma Village Sidewalk Improvement project has been cancelled. The City Council approved this on 1/26/2023.Proposed Substantial Amendment 3 (Draft July 2024) to the City of Palm Desert's FY 2020-21 Annual Action Plan is to reallocate resources to new newly identified activities that have appropriate PPE tieback due to a lapse and ultimate close out in previously approved projects. Council will consider this Amendment for approval at their first meeting in September of 2024.
Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)
1. Introduction
In order to receive Community Development Block Grant (CDBG) Program funds, the City of Palm Desert (City) is required to submit an Annual Action Plan (Action Plan) to the U.S. Department of Housing and Urban Development (HUD). The Action Plan outlines eligible activities selected to fund with CDBG funds in Program Year 2020. The Action Plan represents the third year of the Program Year 2018-2022 Consolidated Plan (Consolidated Plan). The City will receive $409,923 in CDBG funds in Program Year 2020. The Action Plan utilizes the statutory waivers provided in the CARES Act as well.
2. Summarize the objectives and outcomes identified in the Plan This could be a restatement of items or a table listed elsewhere in the plan or a reference to another location. It may also contain any essential items from the housing and homeless needs assessment, the housing market analysis or the strategic plan.
The Action Plan is intended to fund high-priority community needs identified during the annual Citizen Participation Plan process while aligning with the following goals of the previously-approved Consolidated Plan: support efforts to combat homelessness; enhance public facilities; provide support for public service programs; and increase fair housing activities.
3. Evaluation of past performance
343
Annual Action Plan
2020
2 OMB Control No: 2506-0117 (exp. 09/30/2021)
This is an evaluation of past performance that helped lead the grantee to choose its goals or projects.
A performance evaluation is annually performed through HUD’s review of the Consolidated Annual Performance and Evaluation Report (CAPER). This document states the objectives and outcomes identified in each Action Plan and includes an evaluation of past performance through measurable goals and objectives relative to actual performance. Prior documents can be found at the Palm Desert City Hall.
4. Summary of Citizen Participation Process and consultation process Summary from citizen participation section of plan.
On January 9, 2020, the City commenced its citizen participation process by holding a public hearing before the City Council to provide an opportunity for the public to comment on and community needs.
Concurrently, the City began soliciting proposals to potentially fund nonprofit organizations for public services and public facilities and improvements. The City also held a community meeting to provide an overview of the CDBG Program and technical assistance on February 6, 2020.
On March 13, 2020, the City’s Outside Agency Funding Committee (Committee) convened to review and discuss CDBG funding recommendations. The Committee recommended approval of the CDBG funding recommendations, as presented. The City held a public comment period from March 20, 2020, through April 22, 2020.
On April 16, 2020, the City Council held a public hearing to accept public comment and consider the Action Plan. However, City staff revised its recommendation to open and close the public hearing without further action because of the CARES Act allocation (CDBG-CV) and statutory waivers. Since the statutory waivers remove the 15% public services cap, the City solicited proposals again to potentially fund nonprofit organizations to prevent, prepare for, and respond to the coronavirus.
On May 14, 2014, the City Council considered the concept of an Emergency Rental Assistance Program as a result of the coronavirus. The City Council approved policy guidelines that allowed staff to begin taking administrative steps to create the program expediously.
On May 20, 2020, the Committee convened again to review and discuss the revised CDBG funding recommendations. The Committee recommended approval of the revised CDBG funding recommendations, as presented. While the statutory waivers allow for a five-day public comment period, the City held its from May 22, 2020, through May 31, 2020.
On May 28, 2020, the City Council held a public hearing and subsequently approved the Action Plan, as presented.
344
Annual Action Plan
2020
3 OMB Control No: 2506-0117 (exp. 09/30/2021)
As part of the 3rd Substantial Amendment process the City followed it's Citizen Participation Plan and issued a Public Notice opening a 30 day public comment period followed by a public hearing. The Council will take action on the proposed 3rd Substantial Amendment at their 1st meeting in September of 2024.
As part of the 4th Substantial Amendment process, the City followed it's Citizen Participation Plan and issued a Public Notice opening a 30 day public comment period followed by a public hearing. The Council will take action on the proposed 3rd Substantial Amendment in April, 2025.
5. Summary of public comments
This could be a brief narrative summary or reference an attached document from the Citizen Participation section of the Con Plan.
The City did not receive any public comments.
6. Summary of comments or views not accepted and the reasons for not accepting them The City did not receive any public comments.
7. Summary
This Action Plan identifies CDBG-eligible activities selected by the City to fund this program year. These activities align with the goals and outcomes identified in the Consolidated Plan. Also, these activities are administered by both the City as the grantee and nonprofit organizations as subrecipients. This Action Plan enables the City to examine high-priority community needs; to propose activities that effectively utilize resources to address those needs; and to improve the quality of life for low and moderate-income persons.
345
Annual Action Plan
2020
4 OMB Control No: 2506-0117 (exp. 09/30/2021)
PR-05 Lead & Responsible Agencies – 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
Lead Agency PALM DESERT
CDBG Administrator City Manager's Office / City of Palm Desert HOPWA Administrator
HOME Administrator
HOPWA-C Administrator
Table 1 – Responsible Agencies
Narrative (optional)
Consolidated Plan Public Contact Information
Mr. Christopher Gerry
346
Annual Action Plan
2020
5 OMB Control No: 2506-0117 (exp. 09/30/2021)
Management Analyst
73-510 Fred Waring Drive
Palm Desert, CA 92260
(760) 776-6335
[email protected]
347
Annual Action Plan
2020
6 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-10 Consultation – 91.100, 91.200(b), 91.215(l)
1. Introduction
The City followed its HUD-approved Citizen Participation Plan to consult with the public, nonprofit organizations, governmental agencies, and other stakeholders to prepare the Action Plan as required by 24 CRF 91.100. The City's utilized the statutory waivers provided in the CARES Act as well.
Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
On January 9, 2020, the City commenced its citizen participation process by holding a public hearing before the City Council to provide an opportunity for the public to comment on and community needs.
Concurrently, the City began soliciting proposals to potentially fund nonprofit organizations for public services and public facilities and improvements. The City also held a community meeting to provide an overview of the CDBG Program and technical assistance on February 6, 2020.
On March 13, 2020, the City’s Outside Agency Funding Committee (Committee) convened to review and discuss CDBG funding recommendations. The Committee recommended approval of the CDBG funding recommendations, as presented. The City held a public comment period from March 20, 2020, through April 22, 2020.
On April 16, 2020, the City Council held a public hearing to accept public comment and consider the Action Plan. However, City staff revised its recommendation to open and close the public hearing without further action because of the CARES Act allocation (CDBG-CV) and statutory waivers. Since the statutory waivers remove the 15% public services cap, the City solicited proposals again to potentially fund nonprofit organizations to prevent, prepare for, and respond to the coronavirus.
On May 14, 2014, the City Council considered the concept of an Emergency Rental Assistance Program as a result of the coronavirus. The City Council approved policy guidelines that allowed staff to begin taking administrative steps to create the program expediously.
On May 20, 2020, the Committee convened again to review and discuss the revised CDBG funding recommendations. The Committee recommended approval of the revised CDBG funding recommendations, as presented. While the statutory waivers allow for a five-day public comment period, the City held its from May 22, 2020, through May 31, 2020.
On May 28, 2020, the City Council held a public hearing and subsequently approved the Action Plan. 348
Annual Action Plan
2020
7 OMB Control No: 2506-0117 (exp. 09/30/2021)
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The City is actively involved in multiple activities to address the needs of homeless persons, which include coordination with the Continuum of Care. For example, the City is involved in regional coordination efforts between stakeholders throughout the Coachella Valley and Riverside County.
The City has historically funded homelessness services coordinated regionally through the Coachella Valley Association of Governments (CVAG). For years, the City contributed funds to CVAG for the operation of Roy's Desert Resource Center, which permanently closed in July 2017. Since then, CVAG has allocated its regional financial commitments for other homelessness services. The City recently made another financial commitment in the amount of $100,000 to CVAG to continue to implement homelessness services. A summary of accomplishments can be found at City Hall.
The City previously budgeted General Fund revenue for its own homelessness program as well. City and County staff have since developed a program that has a primary focus on homelessness locally. The program contracts with the Riverside University Health System to provide a Behavioral Health Specialist and a Mental Health Peer Support Specialist in Palm Desert to focus on providing homelessness services.
The agreement commences on July 1, 2019, and ends December 31, 2020. Please note the County of Riverside coordinates the Continuum of Care.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS The City does not receive Emergency Solutions Grant (ESG) funds.
2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
349
Annual Action Plan
2020
8 OMB Control No: 2506-0117 (exp. 09/30/2021)
Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization Fair Housing Council of Riverside County, Inc., Agency/Group/Organization Type Service-Fair Housing
What section of the Plan was addressed by Consultation? Fair Housing Services Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination? The agency was invited to multiple meetings
and submitted an application for CDBG funds.
3 Agency/Group/Organization DESERT ARC
Agency/Group/Organization Type Services-Persons with Disabilities What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination? The agency was invited to multiple meetings
and submitted an application for CDBG funds.
4 Agency/Group/Organization Cove Communities Senior Association dba The Joslyn Center
Agency/Group/Organization Type Services-Elderly Persons What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination? The agency was invited to multiple meetings
and submitted an application for CDBG funds.
Identify any Agency Types not consulted and provide rationale for not consulting Not applicable.
350
Annual Action Plan
2020
9 OMB Control No: 2506-0117 (exp. 09/30/2021)
Other local/regional/state/federal planning efforts considered when preparing the Plan Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan?
Continuum of Care County of Riverside Public services that assist homeless persons Americans with Disabilities Act U.S. Department of Justice, Civil Rights Division
Public facilities and improvements projects overlap with ADA goals
Table 3 – Other local / regional / federal planning efforts Narrative (optional)
351
Annual Action Plan
2020
10 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-12 Participation – 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal-setting The City followed its approved Citizen Participation Plan to conduct public hearings and community outreach while developing the Action Plan.
The City utilized the statutory waivers in the CARES Act as well.
On January 9, 2020, the City commenced its citizen participation process by holding a public hearing before the City Council to provide an opportunity for the public to comment on and community needs. Concurrently, the City began soliciting proposals to potentially fund nonprofit organizations for public services and public facilities and improvements. The City also held a community meeting to provide an overview of the CDBG Program and technical assistance on February 6, 2020.
On March 13, 2020, the City’s Outside Agency Funding Committee (Committee) convened to review and discuss CDBG funding recommendations. The Committee recommended approval of the CDBG funding recommendations, as presented. The City held a public comment period from March 20, 2020, through April 22, 2020.
On April 16, 2020, the City Council held a public hearing to accept public comment and consider the Action Plan. However, City staff revised its recommendation to open and close the public hearing without further action because of the CARES Act allocation (CDBG-CV) and statutory waivers. Since the statutory waivers remove the 15% public services cap, the City solicited proposals again to potentially fund nonprofit organizations to prevent, prepare for, and respond to the coronavirus.
On May 14, 2020, the City Council considered the concept of an Emergency Rental Assistance Program as a result of the coronavirus. The City Council approved policy guidelines that allowed staff to begin taking administrative steps to create the program expediously.
On May 20, 2020, the Committee convened again to review and discuss the revised CDBG funding recommendations. The Committee recommended approval of the revised CDBG funding recommendations, as presented. While the statutory waivers allow for a five-day public comment period, the City held its from May 22, 2020, through May 31, 2020. 352
Annual Action Plan
2020
11 OMB Control No: 2506-0117 (exp. 09/30/2021)
The City ensures that all public hearings are held at times and locations convenient to the public and with accommodations for persons with disabilities. Upon request, in advance of meetings, the City will attempt to make accommodations for those individuals in need of special assistance. The City also provides technical assistance workshops as requested by the nonprofit organizations participating in the CDBG program.
As part of the 3rd Substantial Amendment process the City followed it's Citizen Participation Plan and issued a Public Notice opening a 30 day public comment period followed by a public hearing. The Council will take action on the proposed 3rd Substantial Amendment at their 1st meeting in September of 2024.
As part of the 4th Substantial Amendment process the City followed it's Citizen Participation Plan and issued a Public Notice opening a 30 day public comment period followed by a public hearing. The Council will take action on the proposed 4th Substantial in April, 2025.
Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
1 Public Hearing
Nontargeted/broad
community
30 0 0
2 Public Hearing
Nontargeted/broad
community
30 0 0
3 Public Meeting Nonprofit Agencies 0 0 0
4 Public Meeting
Nontargeted/broad
community
8 0 0
353
Annual Action Plan
2020
12 OMB Control No: 2506-0117 (exp. 09/30/2021)
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
5 Newspaper Ad
Nontargeted/broad
community
0 0 0
6 Newspaper Ad
Nontargeted/broad
community
0 0 0
7 Newspaper Ad
Minorities
Non-English
Speaking - Specify
other language:
Spanish
None received- SA3 None received- SA3 None received- SA3 8 Newspaper Ad
Nontargeted/broad
community
None received- SA3 None received- SA3 None received- SA3 9 Public Hearing
Nontargeted/broad
community
None received- SA3 None received- SA3 None received- SA3 Table 4 – Citizen Participation Outreach
354
Annual Action Plan
2020
13 OMB Control No: 2506-0117 (exp. 09/30/2021)
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
The City will receive $409,861 in CDBG funds in Program Year 2020.
Anticipated Resources
Program Source of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
CDBG public -
federal
Acquisition
Admin and
Planning
Economic
Development
Housing
Public
Improvements
Public Services 409,861.00 0.00 0.00 409,861.00 800,000.00 As part of the 4th SA, the City will
allocate all remaining CV
resources ($180,000) to Desert
Arc
Table 5 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
355
Annual Action Plan
2020
14 OMB Control No: 2506-0117 (exp. 09/30/2021)
The City receives a small allocation of CDBG funds annually relative to other HUD entitlement communities. As a result, there are minimal funds formally leveraged, but it’s worth noting that each nonprofit organization funded contributes additional resources to implement their activities.
The City does not require subrecipients to match funds. 356
Annual Action Plan
2020
15 OMB Control No: 2506-0117 (exp. 09/30/2021)
If appropriate, describe publicly owned land or property located within the jurisdiction that may be used to address the needs identified in the plan The City will continue to allocate CDBG funding and other sources of funding when and where available to meet community needs. Activities will be targeted that address goals and objectives identified in the Consolidated Plan.
Discussion
The City anticipates budgeting $81,738 for program administration; $208,123 for public services; and $228,490 for public facilities and improvements.
357
Annual Action Plan
2020
16 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
1 Support efforts to
combat
homelessness
2018 2022 Homeless Citywide Homelessness CDBG:
$28,023.00
Homelessness Prevention: 8
Persons Assisted
2 Enhance public
facilities
2018 2022 Non-Housing
Community
Development
Citywide Special Needs
Populations
Low-to-Moderate
Income Housing
Public Facilities
CDBG:
$120,000.00
Public Facility or Infrastructure
Activities other than
Low/Moderate Income Housing
Benefit: 2405 Persons Assisted
3 Provide support for
public service
programs
2018 2022 Non-Homeless
Special Needs
Citywide Homelessness
Fair Housing
CDBG:
$140,000.00
Public service activities other
than Low/Moderate Income
Housing Benefit: 731 Persons
Assisted
5 Increase fair
housing activities
2018 2022 Citywide Fair Housing CDBG:
$40,100.00
Public service activities for
Low/Moderate Income Housing
Benefit: 475 Households Assisted
Table 6 – Goals Summary
Goal Descriptions
358
Annual Action Plan
2020
17 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Goal Name Support efforts to combat homelessness
Goal Description
2 Goal Name Enhance public facilities
Goal Description
3 Goal Name Provide support for public service programs Goal Description The City is funding two public services agency to prevent, prepare for, or respond to the coronavirus. 5 Goal Name Increase fair housing activities
Goal Description
359
Annual Action Plan
2020
18 OMB Control No: 2506-0117 (exp. 09/30/2021)
Projects
AP-35 Projects – 91.220(d)
Introduction
The City will fund CDBG-eligible activities, including public services, public facilities and improvements, and program administration. The cap for program administration is based upon the Program Year 2020 CDBG allocation of $409,861.
Projects
# Project Name
1 Program Administration
2 Public Services
3 Public Facilities and Improvements
Table 7 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The City identifies its highest priority needs during its citizen participation process every year and the Consolidated Plan process every five years. Activities are funded annually taking into consideration these highest priority needs. The primary obstacle to address underserved needs in the community is the lack of resources to provide a greater level of assistance. 360
Annual Action Plan
2020
19 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
361
Annual Action Plan
2020
20 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Project Name Program Administration
Target Area Citywide
Goals Supported Support efforts to combat homelessness
Enhance public facilities
Provide support for public service programs
Increase fair housing activities
Needs Addressed Homelessness
Special Needs Populations
Low-to-Moderate Income Housing
Public Facilities
Fair Housing
Funding CDBG: $81,800.00
Description Program Administration ($81,800)
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed activities
N/A
Location Description City of Palm Desert
73510 Fred Waring Drive
Palm Desert, CA 92260
Planned Activities Grant Administration - $81,800
2 Project Name Public Services
Target Area Citywide
Goals Supported Provide support for public service programs Needs Addressed Special Needs Populations
Low-to-Moderate Income Housing
Fair Housing
Funding CDBG: $905,808.00
Description
Target Date 6/30/2021
362
Annual Action Plan
2020
21 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families
that will benefit from
the proposed activities
Emergency Rental Assistance Program ($28,023): 40 households Fair Housing Council of Riverside County ($40,100): 475 persons The Josyln Center ($80,000): 250 persons
Desert Arc ($60,000): 481 persons
Location Description Emergency Rental Assistance Program ($28,023): 74501 Fred Waring Drive, Palm Desert, CA 92260
Fair Housing Council of Riverside County ($40,100): 4164 Brockton Avenue, Riverside, CA 92501
The Josyln Center ($80,000): 73750 Catalina Way, Palm Desert, CA 92260
Desert Arc ($60,000): 73225 Country Club Drive, Palm Desert, CA 92260 363
Annual Action Plan
2020
22 OMB Control No: 2506-0117 (exp. 09/30/2021)
Planned Activities Emergency Rental Assistance Program ($28,023): The City will select a subrecipient to manage an Emergency Rental Assistance Program for low and moderate-income persons impacted by the coronavirus. These CDBG funds complement additional CDBG-CV funding as part of a Program Year 2019 Action Plan Amendment.
Fair Housing Council of Riverside County ($40,100): The subrecipient provides fair housing services throughout Riverside County, which is a requirement as a recipient of HUD funds.
The Josyln Center ($80,000): The subrecipient provides numerous services for seniors, including social and health/wellness programs.
Because of the coronavirus, the agency has faced a substantial financial reduction due to cancelled fundraisers, losses in class and activity fees, declining renewal and new memberships, and other reasons. The agency continues to facilitate essential services such as home delivered meals, food pantry activities and counseling services. The agency requests funds to sustain the Joslyn Wellness Center, which provides counseling and other wellness-related activities for seniors. The agency requests funds mostly to sustain staffing and other activity costs. (CARES ACT)
Desert Arc ($60,000): The agency enhances the quality of life and creates opportunities for people with disabilities. Because of the coronavirus, the agency has faced a substantial financial reduction due to cancelled fundraisers, reduced revenue-generating programs and other reasons. The agency is developing a re-opening plan that includes a phased approach to get clients back onsite. Implementing the plan is costly, and includes conducting staff training, purchasing personal protective equipment, and other costs. The agency requests funds to sustain staffing levels and implement activities relating to the reopening plan. (CARES ACT) 3 Project Name Public Facilities and Improvements
Target Area Citywide
Goals Supported Enhance public facilities
Needs Addressed Low-to-Moderate Income Housing
Public Facilities
Funding CDBG: $757,490.00
Description
Target Date 6/30/2021
364
Annual Action Plan
2020
23 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families
that will benefit from
the proposed activities
City of Palm Desert - Palma Village Neighborhood Park Improvements ($316,000 proposed increase of $175k as part of SA3): 2,405 persons City of Palm Desert - Palma Village Neighborhood Sidewalk Improvements ($142,490): 2,405 persons
Joslyn Center ADA Improvements ($69,000 proposed as part of SA3):
500 persons
Desert Arc HVAC Upgrades ($180,000 proposed as part of SA4): 500 persons)
Location Description City of Palm Desert - Palma Village Neighborhood Park Improvements ($316,000 proposed increase of $175k as part of SA3): 2,405 persons City of Palm Desert - Palma Village Neighborhood Sidewalk Improvements ($142,490): 2,405 persons
Joslyn Center ADA Improvements ($69,000 proposed as part of SA3):
500 persons
Desert Arc HVAC Upgrades ($180,000 proposed as part of SA4): 500 persons)
365
Annual Action Plan
2020
24 OMB Control No: 2506-0117 (exp. 09/30/2021)
Planned Activities City of Palm Desert - Palma Village Neighborhood Park Improvements:
The City has a CDBG-eligible census tract bound by Fred Waring Drive (north), Highway 111 (south), San Pablo Avenue (west) and Portola Avenue (east). The City requests funds to construct improvements at Palma Village Park. City staff anticipates conducting a neighborhood meeting to identify the types of improvements desired by the residents as well.
City of Palm Desert - Palma Village Neighborhood Sidewalk Improvements: The City has a CDBG-eligible census tract bound by Fred Waring Drive (north), Highway 111 (south), San Pablo Avenue (west) and Portola Avenue (east). The City requests funds to construct improvements in areas missing sidewalks within the neighborhood.
Neighborhood sidewalk connectivity complements the project located off San Pablo Avenue as well.
Joslyn Center- ADA Restroom Improvements 2024: As part of the 3rd Substantial Amendment the City proposes to allocate CV resources to the Senior Center for rehab of their restrooms. The Joslyn Center acts as a testing site, displacement center, and cooling center during crisis.
Desert Arc- HVAC Improvements 2025: as part of the 4th Substantial Amendment, the City proposes to allocate all remaining CV funds to Desert Arc for Upgrades to their HVAC system. Desert Arc acted as a resource during COVID.
366
Annual Action Plan
2020
25 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City is located in Riverside County; particularly, the Coachella Valley. Historically, the City has not had any low- and moderate-income census tracts; however, the City now has two eligible census tracts as of recently (ACS data). Program Year 2020 CDBG funds will be used for low- and moderate-income clientele (or presumed benefit).
Geographic Distribution
Target Area Percentage of Funds
Citywide 100
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically The City has not historically funded CDBG activities based upon geographic areas since there have not been eligible low and moderate-income census tracts; however, HUD recently revised the census criteria used to determine eligibility. As a result, the City now has two CDBG-eligible census tracts. City staff is currently exploring the possibility of a Section 108 Loan for City Council’s consideration in subsequent program years.
Discussion
Not applicable.
367
Annual Action Plan
2020
26 OMB Control No: 2506-0117 (exp. 09/30/2021)
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
The Palm Desert Housing Authority (Authority) owns and operates approximately 1,114 multi-family housing units, and an additional approximately 564 units that are owned and operated by third parties.
There are an additional 303 ownership units for very low, low and moderate income households under the Authority’s affordable housing portfolio.
One Year Goals for the Number of Households to be Supported Homeless 0
Non-Homeless 1,981
Special-Needs 0
Total 1,981
Table 9 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 1,981
The Production of New Units 0
Rehab of Existing Units 0
Acquisition of Existing Units 0
Total 1,981
Table 10 - One Year Goals for Affordable Housing by Support Type Discussion
Not applicable
368
Annual Action Plan
2020
27 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-60 Public Housing – 91.220(h)
Introduction
The City will not undertake activities that address public housing in the program year.
Actions planned during the next year to address the needs to public housing Not applicable. The City does not own nor operate public housing.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
Not applicable. The City does not own nor operate public housing.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not applicable. The City does not own nor operate public housing.
Discussion
Not applicable. The City does not own nor operate public housing. 369
Annual Action Plan
2020
28 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
The City will continue to work with nonprofit organizations, government agencies, and other stakeholders to fund activities that help prevent and reduce homelessness.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The City operates a Homelessness Assistance Program that began July 1, 2019. The City contracted with the Riverside University Health System (i.e., County of Riverside) to provide two full-time staff members to provide continual outreach and case management for homeless persons in Palm Desert. In Program Year 2019, the City funded Path of Life Ministries with CDBG funds to assist with bridge/temporary housing to complement the City's Homelessness Assistance Program.
Addressing the emergency shelter and transitional housing needs of homeless persons The Housing First approach adopted by the County and CoC requires that homeless are helped into permanent housing or rapid re-housing as soon as possible. Transitional housing beds have begun to decrease countywide and permanent housing is increasing because of reallocations made in the HUD CoC Program Consolidated Application and the CoC’s success in obtaining new funding for permanent supportive housing. Both transitional housing and emergency shelters focus on lessening the time that a homeless person or family’s length of time homeless (LOTH) in the shelter by effective and quick assessment of homeless clients and getting them stabilized into permanent housing with intensive case management initially and support in the initial phase of residency in permanent housing. This period will serve as a time to address the other needs to maintain self-sufficiency either by accessing mainstream benefits, employment or medical or mental health support.
The CoC collaborates with the City and other stakeholders to integrate CoC programs, Emergency Solutions Grant (ESG), Social Services to Veteran Families (SSVF), and CDBG funding to increase the number of persons with rapid re-housing assistance. Also, other non-McKinney-Vento funding sources, such as Emergency Food and Shelter Program (EFSP), funded under Federal Emergency Management Agency (FEMA) will be matched as a source for rental / mortgage assistance for families that are homeless or at-risk of homelessness in the County’s strategy to meet this goal.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that 370
Annual Action Plan
2020
29 OMB Control No: 2506-0117 (exp. 09/30/2021)
individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again
The CoC implemented a Coordinated Entry System (CES) to assess homeless persons using the VI-SPDAT that tracks the length of time a client has been on the streets or in an emergency shelter. DPSS uses HUD’s CoC Program planning grant funding to measure system-wide performance in HMIS, such as length of time homeless. This is used to help the CoC prioritize and house those with longest length of time homeless. The planning process also included working with the CoC Standards and Evaluation Committee to continue developing strategies to prioritize persons with longest time homeless and most severe needs, including:
The CoC has also adopted a Housing First approach that is evidenced-based and endorsed by HUD to place a homeless person in permanent housing and provide supportive services intended to keep them stably housed.
Homeless CoC youth providers have implemented outreach and service based events in the communities to draw homeless youth, unaccompanied and transitional age into contact with services available to them. The Operation SafeHouse is the only CoC youth provider that has opened a permanent supportive housing program called the Harrison House, which is for transitional age youth, in the eastern desert region of Riverside County.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The CoC Discharge Policy is mandated by the State and followed by the CoC. The CoC established a Discharge Planning Committee, responsible for implementing policies and protocols and coordinating with various organizations, to ensure that persons being discharged from a publicly-funded institution or system of care are not discharged immediately into homelessness. The goals are to identify discharge housing needs inclusive of housing and supportive services and to link the individual with community resources that will include mental health services, substance abuse support, and housing. The Hospital Association of Southern California Inland Area serves as the lead agency on the Discharge Planning Committee to facilitate communication regarding the discharge planning needs of homeless persons from acute care hospitals. The Riverside County University Health System – Behavioral Health, collaborates with DPSS and the CoC in the coordination and implementation of discharge planning for homeless individuals disabled by a serious mental health and/or substance abuse disorder(s). Foster Care and extended foster care programs help transition dependent youth who are emancipating from 371
Annual Action Plan
2020
30 OMB Control No: 2506-0117 (exp. 09/30/2021)
foster care to independent living. The Department of Public Social Services, Riverside Sheriff’s, and Probation Department support the Continuum of Care’s mission of working towards reintegrating persons leaving correctional facilities to community-based living and self-sufficiency.
Discussion
Not applicable.
372
Annual Action Plan
2020
31 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing – 91.220(j)
Introduction:
The City does not plan to undertake any activities this program year to remove barriers to affordable housing.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
The City does not plan to undertake any activities this program year to remove barriers to affordable housing.
Discussion:
Not applicable.
373
Annual Action Plan
2020
32 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions – 91.220(k)
Introduction:
The City will continue to work with various stakeholders to meet the needs of its residents that remain in-need of CDBG-eligible activities consistent with Consolidated Plan goals.
Actions planned to address obstacles to meeting underserved needs The City will continue to work toward the reduction/elimination of obstacles to meet underserved needs through the funding of various organizations that are established to provide direct services to those in need. The City is not equipped to provide direct services; therefore, funding organizations that do is essential to our success in addressing the identified goals and objectives. The City will continue to partner with service providers to address obstacles and address barriers that exist. In addition, the City works with the County of Riverside, the CoC, local agencies, nonprofits, etc. to address various aspects related to CoC programs and activities, as well as obstacles that face the underserved in general.
However, the CoC addresses issues relative to homelessness, mental and physical illnesses, domestic violence, etc. and has a wide range of members where collaboration in other areas is an option. Through these working relationships, obstacles such as lack of communication between agencies, improved services, limited resources, tracking and monitoring, and other needed resources are obtained, gaps in services are better identified, and there is a more cohesive approach to identifying and resolving issues.
Actions planned to foster and maintain affordable housing The City and the Palm Desert Housing Authority will continue to maintain the existing affordable housing stock through the funding sources identified previously; however, as noted with the elimination of redevelopment agencies, there is no longer what is considered 20% Set-aside funds. Therefore, maintaining existing properties and programs will be the primary focus, provided funding is available, for some time to come. However, new projects and programs will be planned and implemented where and when possible.
Actions planned to reduce lead-based paint hazards
The City’s Building and Safety and Housing departments distribute informational pamphlets on Lead Based Paint Hazards and refer all calls to the County of Riverside Environmental Health Department. The City addresses this issue on a case-by-case basis through multiple steps.
Actions planned to reduce the number of poverty-level families The City is continuing to team up with service providers to provide assistance for poverty level families, including funding food and services options during the Program Year. In addition, the City will seek out additional partnerships for programs that encourage self sufficiency including employment and training, 374
Annual Action Plan
2020
33 OMB Control No: 2506-0117 (exp. 09/30/2021)
housing options, and safety net programs.
Actions planned to develop institutional structure
The City will continue to work with outside agencies to maintain and develop relationships, including the County of Riverside, nonprofit organization, private businesses, the CoC, and nonprofit organizations in the region.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to work with various County departments, agencies, and nonprofit organizations to identify and carry out goals and objectives of the CDBG Program, and to create a more cooperative working relationship with all interested parties. The City invites these groups to attend public hearings, community meetings, and special meetings that address specific programs and projects. The City has an approved Citizen’s Participation Plan that it follows in this regard. In addition, City staff regularly attends CoC meetings that involve multiple organizations and various County Departments as well as other local jurisdictions wherein discussions are held on homelessness as well as supportive services to other at risk groups of individuals and families.
Discussion:
Not applicable.
375
Annual Action Plan
2020
34 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
Activities planned with CDBG funds expected to be available during the year are identified in the project tables. The following identifies program income that is available for use that is included in projects to be carried out.
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0
2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 62
5. The amount of income from float-funded activities 0
Total Program Income: 62
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income. Overall Benefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 70.00% Not Applicable.
376
Annual Action Plan
2021
1 OMB Control No: 2506-0117 (exp. 09/30/2021)
Substantial Amendment #3 to roll all remaining grant funds ($59,723.44) to PY24 to fund the Palm Desert Housing Authority Public Facility Project- Parking Lot Upgrades- April 2025.
Previous SA: Substantial amendment for a project funded in PY2021-22 AAP, Desert Arc, IDIS activity #299. On May 13, 2021, the City Council approved the submission of the Fiscal Year 2021 Action Plan, including funding recommendations for the Community Development Block Grant Program (CDBG), to the U.S. Department of Housing and Urban Development (HUD).This substantial amendment to the FY 2021-22 Annual Action Plan will change the Council approved project for constructing a covered shelter to sidewalk and pathway improvements. Desert Arc representatives informed City Staff the approved project is no longer a priority, and sidewalks and pathways improvements were a high priority for the agency since this would drastically improve the quality of life for clients by easing the use of wheelchairs and reducing slip hazards. This project meets the HUD CDBG regulations, CFR 24 570.201(c); therefore, the City is recommending changing the project at Desert Arc, which will benefit the clients served. It is important to note, the funding amount does not change, only the project description. On June 22, 2023, the City of Palm Desert City Council approved the substantial amendment for said project description noted above.
Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)
1. Introduction
This Action Plan Amendment does not change the funding amount for IDIS activity #299, Desert Arc, only a change in the original project/activity description. The original project/activity description called for installation of covered shelter to provide safety to clients during programs being held, holding emergency drills and emergencies. The project/activity has been amended to provide sidewalk and pathway improvements. This amendment was approved by the City Council June 22, 2023.
As a requirement of the U.S. Department of Housing and Urban Development, this document represents the Program Year 2021 Action Plan. The City of Palm Desert (City) has been allocated $424,832 in Community Development Block Grant (CDBG) funds.
2. Summarize the objectives and outcomes identified in the Plan This could be a restatement of items or a table listed elsewhere in the plan or a reference to another location. It may also contain any essential items from the housing and homeless needs assessment, the housing market analysis or the strategic plan. 377
Annual Action Plan
2021
2 OMB Control No: 2506-0117 (exp. 09/30/2021)
This could be a restatement of items or a table listed elsewhere in the plan or a reference to another location. It may also contain any essential items from the housing and homeless needs assessment, the housing market analysis or the strategic plan.
The Action Plan is intended to fund high-priority community needs identified during the annual Citizen Participation Plan process while concurrently aligning with the goals of the previously-approved Program Year 2018-2022 Consolidated Plan.
3. Evaluation of past performance
This is an evaluation of past performance that helped lead the grantee to choose its goals or projects.
This is an evaluation of past performance that helped lead the grantee to choose its goals or projects.
A performance evaluation is annually performed through HUD’s review of the Consolidated Annual Performance and Evaluation Report (CAPER). This document states the objectives and outcomes identified in each Action Plan and includes an evaluation of past performance through measurable goals and objectives relative to actual performance. Prior documents can be found at the Palm Desert City Hall.
4. Summary of Citizen Participation Process and consultation process Summary from citizen participation section of plan.
Summary from citizen participation section of plan.
The City held a public comment period from April 14, 2021, through May 14, 2021. On May 13, 2021, the City Council held a public hearing to provide residents an additional opportunity to review and comment on programming of CDBG funds.
As part of SA #3 the City followed the Citizen Input process, posted for a public comment period as well as the public hearing.
5. Summary of public comments
This could be a brief narrative summary or reference an attached document from the Citizen Participation section of the Con Plan.
This could be a brief narrative summary or reference an attached document from the Citizen Participation section of the Con Plan.
378
Annual Action Plan
2021
3 OMB Control No: 2506-0117 (exp. 09/30/2021)
The City did not receive any public comments.
6. Summary of comments or views not accepted and the reasons for not accepting them The City did not receive any public comments.
7. Summary
This Action Plan identifies CDBG-eligible activities selected by the City to fund this program year. These activities align with the goals and outcomes identified in the Consolidated Plan. Also, these activities are administered by both the City as the grantee and nonprofit organizations as subrecipients. This Action Plan enables the City to examine high-priority community needs; to propose activities that effectively utilize resources to address those needs; and to improve the quality of life for low and moderate-income persons.
379
Annual Action Plan
2021
4 OMB Control No: 2506-0117 (exp. 09/30/2021)
PR-05 Lead & Responsible Agencies – 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
Lead Agency PALM DESERT
CDBG Administrator City Manager's Office / City of Palm Desert HOPWA Administrator
HOME Administrator
HOPWA-C Administrator
Table 1 – Responsible Agencies
Narrative (optional)
Consolidated Plan Public Contact Information
380
Annual Action Plan
2021
5 OMB Control No: 2506-0117 (exp. 09/30/2021)
Mr. Christopher Gerry
Senior Management Analyst
73-510 Fred Waring Drive
Palm Desert, CA 92260
760-346-0611
381
Annual Action Plan
2021
6 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-10 Consultation – 91.100, 91.200(b), 91.215(l)
1. Introduction
The City followed its HUD-approved Citizen Participation Plan to consult with the public, nonprofit organizations, governmental agencies, and other stakeholders to prepare the Action Plan as required by 24 CRF 91.100.
Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
On February 25, 2021, the Palm Desert City Council held a public hearing to receive comments regarding the development of the Action Plan. The City conducted outreach and issued public notices regarding the application process for subrecipient awards as well.
On April 14, 2021, the City's Outside Agency Funding Committee recommended CDBG budget recommendations, which are incorporated into the Action Plan. The City held a 30-day public comment period from April 14, 2021, through May 14, 2021.
On May 13, 2021, the City Council held a public hearing to provide residents an additional opportunity review and comment regarding CDBG funding recommendations. The City Council approved the submission of the Action Plan.
The City submitted the Action Plan on May 15, 2021.
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The City is actively involved in multiple activities to address the needs of homeless persons, which include coordination with the Continuum of Care. For example, the City is involved in regional coordination efforts between stakeholders throughout the Coachella Valley and Riverside County.
The City has historically funded homelessness services coordinated regionally through the Coachella Valley Association of Governments (CVAG). For years, the City contributed funds to CVAG for the operation of Roy’s Desert Resource Center, which permanently closed in July 2017. Since then, CVAG has allocated its regional financial commitments for other homelessness services. The City recently made another financial commitment in the amount of $100,000 to CVAG to continue to implement homelessness services. A summary of accomplishments can be found at City Hall. 382
Annual Action Plan
2021
7 OMB Control No: 2506-0117 (exp. 09/30/2021)
The City operates a homelessness assistance program as well. The program that has a primary focus on homelessness locally. The program contracts with the Riverside University Health System to provide a Behavioral Health Specialists in Palm Desert to focus on providing homelessness services. Please note the County of Riverside coordinates the Continuum of Care as well.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS The City does not receive Emergency Solutions Grant (ESG) funds.
2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
383
Annual Action Plan
2021
8 OMB Control No: 2506-0117 (exp. 09/30/2021)
Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization Fair Housing Council of Riverside County, Inc., Agency/Group/Organization Type Service-Fair Housing
What section of the Plan was addressed by Consultation? Housing Need Assessment Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (fair housing).
2 Agency/Group/Organization Cove Communities Senior Association dba The Joslyn Center
Agency/Group/Organization Type Services-Elderly Persons What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (elderly persons).
3 Agency/Group/Organization OPERATION SAFEHOUSE, INC.
Agency/Group/Organization Type Services-homeless
What section of the Plan was addressed by Consultation? Homelessness Needs - Unaccompanied youth Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (homeless/unaccompanied youth).
4 Agency/Group/Organization Desert Access and Mobility
Agency/Group/Organization Type Services-Persons with Disabilities What section of the Plan was addressed by Consultation? Non-Homeless Special Needs 384
Annual Action Plan
2021
9 OMB Control No: 2506-0117 (exp. 09/30/2021)
Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (persons with disabilities).
5 Agency/Group/Organization John F. Kennedy Memorial Foundation/Healthy Family Agency/Group/Organization Type Services-Children
What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to construct public facilities and improvements (serving at-risk youth).
6 Agency/Group/Organization DESERT ARC
Agency/Group/Organization Type Services-Persons with Disabilities What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to construct public facilities and improvements (serving people with
disabilities).
Identify any Agency Types not consulted and provide rationale for not consulting The City attempts to keep a comprehensive list of stakeholders potentially eligible to receive CDBG funds for activities consistent with the Consolidated Plan goals. As some stakeholders undergo staffing changes, on occasion City staff is unaware of such changes throughout the program year. As a result, some stakeholders may not realize the City is attempting to consult with their organizations during the Action Plan process. To mitigate this concern, City staff updates its contact list annually to ensure proper channels of communication with stakeholders. 385
Annual Action Plan
2021
10 OMB Control No: 2506-0117 (exp. 09/30/2021)
Other local/regional/state/federal planning efforts considered when preparing the Plan Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan?
Continuum of Care
Table 3 – Other local / regional / federal planning efforts Narrative (optional)
386
Annual Action Plan
2021
11 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-12 Participation – 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal-setting On February 25, 2021, the Palm Desert City Council held a public hearing to receive comments regarding the development of the Action Plan.
The City conducted outreach and issued public notices regarding the application process for subrecipient awards as well.
On April 14, 2021, the City's Outside Agency Funding Committee recommended CDBG budget recommendations, which are incorporated into the Action Plan. The City held a 30-day public comment period from April 14, 2021, through May 14, 2021.
On May 13, 2021, the City Council held a public hearing to provide residents an additional opportunity review and comment regarding CDBG funding recommendations. The City Council approved the submission of the Action Plan.
The City submitted the Action Plan on May 15, 2021.
Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
1 Public Hearing
Nontargeted/broad
community
Public Hearing
(02/25/2021
30 0 0
387
Annual Action Plan
2021
12 OMB Control No: 2506-0117 (exp. 09/30/2021)
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
2 Public Meeting
Nontargeted/broad
community
Outside Agency
Meeting
(04/14/2021)
5 0 0
4 Public Hearing Public Hearing
(05/13/21) 30 0 0
Table 4 – Citizen Participation Outreach
388
Annual Action Plan
2021
13 OMB Control No: 2506-0117 (exp. 09/30/2021)
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
This Action Plan represents an allocation from HUD in the amount of $424,832 in CDBG funds for Program Year 2021.
Anticipated Resources
Program Source of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
CDBG public -
federal
Acquisition
Admin and
Planning
Economic
Development
Housing
Public
Improvements
Public Services 424,832.00 0.00 0.00 424,832.00 424,000.00 As part of SA #3 the City is rolling
all remaining funds ($59723.44) to
PY24 to fund the PDHA Public
Facility Project.
Table 5 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
389
Annual Action Plan
2021
14 OMB Control No: 2506-0117 (exp. 09/30/2021)
The above sources of funding have been identified as available funds to be leveraged with, where and when possible, nonprofit organizations and other entities awarded CDBG funds to provide assistance to meet the goals and objectives as outlined within the City's Five-Year Consolidated Plan and One-Year Action Plan. Funded organizations will also utilize awarded funds to leverage, where and when possible, dollars available through the organization as well as other grant awards and/or donations to undertake programs/projects that may not otherwise be possible. Organizations have more flexibility to utilize funding more efficiently and effectively to provide needed support services to clients. 390
Annual Action Plan
2021
15 OMB Control No: 2506-0117 (exp. 09/30/2021)
If appropriate, describe publically owned land or property located within the jurisdiction that may be used to address the needs identified in the plan N/A
Discussion
The City will continue to allocate CDBG funding and other sources of funding when and where available to meet the needs of qualifying individuals as designated by HUD. Programs and projects will be targeted that address goals and objectives identified within the Action Plan and Consolidated Plan. In addition, the funds will be targeted so as to provide the maximize benefit to those in need. 391
Annual Action Plan
2021
16 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
1 Support efforts to
combat
homelessness
2018 2022 Homeless Citywide Homelessness CDBG:
$10,000.00
Public Facility or Infrastructure
Activities for Low/Moderate
Income Housing Benefit: 20
Households Assisted
2 Enhance public
facilities
2018 2022 Non-Housing
Community
Development
Citywide Public Facilities CDBG:
$273,463.00
Other: 3 Other
3 Provide support for
public service
programs
2018 2022 Non-Homeless
Special Needs
Citywide Special Needs
Populations
Low-to-Moderate
Income Housing
CDBG:
$30,000.00
Public service activities for
Low/Moderate Income Housing
Benefit: 136 Households Assisted
5 Increase fair
housing activities
2018 2022 Citywide Fair Housing CDBG:
$42,200.00
Public service activities for
Low/Moderate Income Housing
Benefit: 475 Households Assisted
Table 6 – Goals Summary
Goal Descriptions
392
Annual Action Plan
2021
17 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Goal Name Support efforts to combat homelessness
Goal Description
2 Goal Name Enhance public facilities
Goal Description
3 Goal Name Provide support for public service programs Goal Description
5 Goal Name Increase fair housing activities
Goal Description
393
Annual Action Plan
2021
18 OMB Control No: 2506-0117 (exp. 09/30/2021)
Projects
AP-35 Projects – 91.220(d)
Introduction
The Action Plan identifies funding the following activities:
Public Services ($62,200)
Public Facilities and Improvements ($279,632)
Program Administration ($83,000)
Projects
# Project Name
1 Public Facilities and Improvements
2 Public Services
3 Program Administration
Table 7 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The City identifies its highest priority needs during its citizen participation process every year and the Consolidated Plan process every five years. Activities are funded annually taking into consideration these highest priority needs. The primary obstacle to address underserved needs in the community is the lack of resources to provide a greater level of assistance. 394
Annual Action Plan
2021
19 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
395
Annual Action Plan
2021
20 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Project Name Public Facilities and Improvements
Target Area Citywide
Goals Supported Enhance public facilities
Needs Addressed Special Needs Populations
Public Facilities
Funding CDBG: $279,632.00
Description Funding public facilities and improvements at the John F. Kennedy Memorial Foundation ($109,300), Joslyn Center ($80,000), Desert ARC ($60,000) and the City ($30,332)
As part of SA#3 $59,723.44 will be rolled to PY24 for PDHA Parking Lot Upgrade Project.
Target Date 6/30/2022
Estimate the number and
type of families that will
benefit from the proposed
activities
John F. Kennedy Memorial Foundation: 1 facility improvement The Joslyn Center: 1 facility improvement
Desert ARC: 1 facility improvement
City of Palm Desert: 1 facility improvement
Location Description John F. Kennedy Memorial Foundation: 73555 San Gorgonio Way, Palm Desert, CA 92260
The Joslyn Center: 73750 Catalina Way, Palm Desert, CA 92260 Desert ARC: 73255 Country Club Dr, Palm Desert, CA 92260 City of Palm Desert: 73510 Fred Waring Drive, Palm Desert, CA 92260
Planned Activities John F. Kennedy Memorial Foundation ($109,300) - Roof replacement and security improvements
The Joslyn Center ($80,000) - ADA restroom improvements Desert ARC ($60,000) - Amended project - Sidewalk and pathway improvements to the facility. original proposal (outdoor shelter for people with disabilities)
The City of Palm Desert ($30,332) - Palma Village Park
improvements
2 Project Name Public Services
Target Area Citywide
396
Annual Action Plan
2021
21 OMB Control No: 2506-0117 (exp. 09/30/2021)
Goals Supported Provide support for public service programs Increase fair housing activities
Needs Addressed Special Needs Populations
Fair Housing
Funding CDBG: $62,200.00
Description American Red Cross ($10,000), Big Brothers Big Sisters of the Desert ($10,000), Desert Access & Mobility ($10,000), Fair Housing Council of Riverside County ($22,000) and Operation SafeHouse ($10,000).
Target Date 6/30/2022
Estimate the number and
type of families that will
benefit from the proposed
activities
American Red Cross: 16
Big Brothers Big Sisters of the Desert: 45
Desert Access & Mobility: 75
Fair Housing Council of Riverside County: 475
Operation SafeHouse: 20
Location Description American Red Cross: 2 Lincoln Place, Rancho Mirage, CA 92270 Big Brothers Big Sisters of the Desert: 42600 Cook Street, Suite 110, Palm Desert, CA 92211
Desert Access & Mobility: 471 E. Tahquitz Canyon Way, Suite 218, Palm Springs, CA 92262
Fair Housing Council of Riverside County: 4164 Brockton Avenue, Riverside, CA 92501
Operation SafeHouse: 9685 Hayes Street, Riverside, CA 92503 Planned Activities American Red Cross: Emergency financial assistance to households affected by fires
Big Brothers Big Sisters of the Desert: Mentoring and educational assistance for disadvantaged high school youth
Desert Access & Mobility: Transportation services to individuals who are blind, disabled or cannot drive safely
Fair Housing Council of Riverside County: Mandated fair housing services
Operation SafeHouse: Case management services for homeless youth at a transitional living facility
Project Name Program Administration
397
Annual Action Plan
2021
22 OMB Control No: 2506-0117 (exp. 09/30/2021)
3 Target Area Citywide
Goals Supported Enhance public facilities
Provide support for public service programs
Increase fair housing activities
Needs Addressed Homelessness
Special Needs Populations
Low-to-Moderate Income Housing
Public Facilities
Fair Housing
Funding CDBG: $83,000.00
Description Program Administration ($63,000) and fair housing services ($20,000)
Target Date 6/30/2022
Estimate the number and
type of families that will
benefit from the proposed
activities
Program Administration: N/A
Fair Housing Council of Riverside County: Statistics under public services
Location Description Program Administration: 73510 Fred Waring Drive, Palm Desert, CA 92260
Fair Housing Council of Riverside County: 4164 Brockton Avenue, Riverside, CA 92501
Planned Activities Program Administration: CDBG grant management Fair Housing Council of Riverside County: federally mandated fair housing services
398
Annual Action Plan
2021
23 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City of Palm Desert is located in Riverside County; particularly, the Coachella Valley. Historically, the City has not had any low- and moderate-income census tracts; however, the City now has two eligible census tracts as of recently (ACS data). CDBG funds will be used for low- and moderate-income clientele (or presumed benefit).
Geographic Distribution
Target Area Percentage of Funds
Citywide 100
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically The City has not historically funded CDBG activities based upon geographic areas since there have not been eligible low and moderate-income census tracts; however, HUD recently revised the census criteria used to determine eligibility. As a result, the City now has two CDBG-eligible census tracts. City staff is currently exploring the possibility of a Section 108 Loan for City Council’s consideration in subsequent program years.
Discussion
N/A
399
Annual Action Plan
2021
24 OMB Control No: 2506-0117 (exp. 09/30/2021)
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
The City is not undertaking any CBDG-funded housing activities in the program year.
One Year Goals for the Number of Households to be Supported Homeless 0
Non-Homeless 0
Special-Needs 0
Total 0
Table 9 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 0
The Production of New Units 0
Rehab of Existing Units 0
Acquisition of Existing Units 0
Total 0
Table 10 - One Year Goals for Affordable Housing by Support Type Discussion
N/A
400
Annual Action Plan
2021
25 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-60 Public Housing – 91.220(h)
Introduction
The City will not undertake activities that address public housing in the program year.
Actions planned during the next year to address the needs to public housing Not Applicable. The City does not own nor operate public housing.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
Not Applicable. The City does not own nor operate public housing.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not Applicable. The City does not own nor operate public housing.
Discussion
Not Applicable. The City does not own nor operate public housing. 401
Annual Action Plan
2021
26 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
The City will continue to work with nonprofit organizations, government agencies, and other stakeholders to fund activities that help prevent and reduce homelessness.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The City operates a homelessness assistance program as well. The program that has a primary focus on homelessness locally. The program contracts with the Riverside University Health System to provide a Behavioral Health Specialists in Palm Desert to focus on providing homelessness services.
Addressing the emergency shelter and transitional housing needs of homeless persons The Housing First approach adopted by the County and CoC requires that homeless are helped into permanent housing or rapid re-housing as soon as possible. Transitional housing beds have begun to decrease countywide and permanent housing is increasing because of reallocations made in the HUD CoC Program Consolidated Application and the CoC’s success in obtaining new funding for permanent supportive housing. Both transitional housing and emergency shelters focus on lessening the time that a homeless person or family’s length of time homeless (LOTH) in the shelter by effective and quick assessment of homeless clients and getting them stabilized into permanent housing with intensive case management initially and support in the initial phase of residency in permanent housing. This period will serve as a time to address the other needs to maintain self-sufficiency either by accessing mainstream benefits, employment or medical or mental health support.
The CoC collaborates with the City and other stakeholders to integrate CoC programs, Emergency Solutions Grant (ESG), Social Services to Veteran Families (SSVF), and CDBG funding to increase the number of persons with rapid re-housing assistance. Also, other non-McKinney-Vento funding sources, such as Emergency Food and Shelter Program (EFSP), funded under Federal Emergency Management Agency (FEMA) will be matched as a source for rental / mortgage assistance for families that are homeless or at-risk of homelessness in the County’s strategy to meet this goal.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were 402
Annual Action Plan
2021
27 OMB Control No: 2506-0117 (exp. 09/30/2021)
recently homeless from becoming homeless again
The CoC implemented a Coordinated Entry System (CES) to assess homeless persons using the VI-SPDAT that tracks the length of time a client has been on the streets or in an emergency shelter. DPSS uses HUD’s CoC Program planning grant funding to measure system-wide performance in HMIS, such as length of time homeless. This is used to help the CoC prioritize and house those with longest length of time homeless. The planning process also included working with the CoC Standards and Evaluation Committee to continue developing strategies to prioritize persons with longest time homeless and most severe needs, including:
The CoC has also adopted a Housing First approach that is evidenced-based and endorsed by HUD to place a homeless person in permanent housing and provide supportive services intended to keep them stably housed.
Homeless CoC youth providers have implemented outreach and service based events in the communities to draw homeless youth, unaccompanied and transitional age into contact with services available to them. The Operation SafeHouse is the only CoC youth provider that has opened a permanent supportive housing program called the Harrison House, which is for transitional age youth, in the eastern desert region of Riverside County.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The CoC Discharge Policy is mandated by the State and followed by the CoC. The CoC established a Discharge Planning Committee, responsible for implementing policies and protocols and coordinating with various organizations, to ensure that persons being discharged from a publicly-funded institution or system of care are not discharged immediately into homelessness. The goals are to identify discharge housing needs inclusive of housing and supportive services and to link the individual with community resources that will include mental health services, substance abuse support, and housing. The Hospital Association of Southern California Inland Area serves as the lead agency on the Discharge Planning Committee to facilitate communication regarding the discharge planning needs of homeless persons from acute care hospitals. The Riverside County University Health System – Behavioral Health, collaborates with DPSS and the CoC in the coordination and implementation of discharge planning for homeless individuals disabled by a serious mental health and/or substance abuse disorder(s). Foster Care and extended foster care programs help transition dependent youth who are emancipating from foster care to independent living. The Department of Public Social Services, Riverside Sheriff’s, and Probation Department support the Continuum of Care’s mission of working towards reintegrating 403
Annual Action Plan
2021
28 OMB Control No: 2506-0117 (exp. 09/30/2021)
persons leaving correctional facilities to community-based living and self-sufficiency.
Discussion
N/A
404
Annual Action Plan
2021
29 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing – 91.220(j)
Introduction:
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Discussion:
N/A
405
Annual Action Plan
2021
30 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions – 91.220(k)
Introduction:
The City will continue to work with various stakeholders to meet the needs of its residents that remain in-need of CDBG-eligible activities consistent with Consolidated Plan goals.
Actions planned to address obstacles to meeting underserved needs The City will continue to work toward the reduction/elimination of obstacles to meet underserved needs through the funding of various organizations that are established to provide direct services to those in need. The City is not equipped to provide direct services; therefore, funding organizations that do is essential to our success in addressing the identified goals and objectives. The City will continue to partner with service providers to address obstacles and address barriers that exist. In addition, the City works with the County of Riverside, the CoC, local agencies, nonprofits, etc. to address various aspects related to CoC programs and activities, as well as obstacles that face the underserved in general.
However, the CoC addresses issues relative to homelessness, mental and physical illnesses, domestic violence, etc. and has a wide range of members where collaboration in other areas is an option. Through these working relationships, obstacles such as lack of communication between agencies, improved services, limited resources, tracking and monitoring, and other needed resources are obtained, gaps in services are better identified, and there is a more cohesive approach to identifying and resolving issues.
Actions planned to foster and maintain affordable housing The City and the Palm Desert Housing Authority will continue to maintain the existing affordable housing stock through the funding sources identified previously; however, as noted with the elimination of redevelopment agencies, there is no longer what is considered “20% Set Aside Funds”. Therefore, maintaining existing properties and programs will be the primary focus, provided funding is available, for some time to come. However, new projects and programs will be planned and implemented where and when possible.
Actions planned to reduce lead-based paint hazards
The City’s Building & Safety and Housing departments distribute informational pamphlets on Lead Based Paint Hazards and refer all calls to the County of Riverside Environmental Health Department. The City addresses this issue on a case by case basis through multiple steps.
Actions planned to reduce the number of poverty-level families The City is continuing to team up with service providers to provide assistance for poverty level families, including funding food and services options during the Program Year. In addition, the City will seek out additional partnerships for programs that encourage self sufficiency including employment and training, 406
Annual Action Plan
2021
31 OMB Control No: 2506-0117 (exp. 09/30/2021)
housing options, and safety net programs.
Actions planned to develop institutional structure
The City will continue to work with outside agencies to maintain and develop relationships, including with nonprofit organizations, private businesses, the CoC, and nonprofit organizations in the region.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to work with various County departments, agencies, and nonprofit organizations to identify and carry out goals and objectives of the CDBG Program, and to create a more cooperative working relationship with all interested parties. The City invites these groups to attend public hearings, community meetings, and special meetings that address specific programs and projects. The City has an approved Citizen’s Participation Plan that it follows in this regard. In addition, City staff regularly attends CoC meetings that involve multiple organizations and various County Departments as well as other local jurisdictions wherein discussions are held on homelessness as well as supportive services to other at risk groups of individuals and families.
Discussion:
N/A
407
Annual Action Plan
2021
32 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
Activities planned with CDBG funds expected to be available during the year are identified in the project tables. The following identifies program income that is available for use that is included in projects to be carried out.
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0
2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 0
5. The amount of income from float-funded activities 0
Total Program Income: 0
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income.Overall Benefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 70.00% 408
Annual Action Plan
2021
33 OMB Control No: 2506-0117 (exp. 09/30/2021)
N/A
409
Annual Action Plan
2021
34 OMB Control No: 2506-0117 (exp. 09/30/2021)
410
Annual Action Plan
2022
1 OMB Control No: 2506-0117 (exp. 09/30/2021)
Substantial Amendment to roll all remaining PY 22 funds ($32,467.73) to PY 24 project, Palm Desert Housing Authority Public Facilities Upgrades, Parking Lot Improvements- April, 2025 Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)
1. Introduction
As a requirement of the U.S. Department of Housing and Urban Development, this document represents the Program Year 2022 Annual Action Plan. The City of Palm Desert (City) has been allocated $394,525 in Community Development Block Grant (CDBG) funds.
2. Summarize the objectives and outcomes identified in the Plan This could be a restatement of items or a table listed elsewhere in the plan or a reference to another location. It may also contain any essential items from the housing and homeless needs assessment, the housing market analysis or the strategic plan.
The Annual Action Plan is intended to fund high-priority community needs identified during the annual Citizen Participation Plan process while concurrently aligning with the goals of the previously approved Program Year 2018-2023 Consolidated Plan.
3. Evaluation of past performance
This is an evaluation of past performance that helped lead the grantee to choose its goals or projects.
A performance evaluation is annually performed through HUD’s review of the Consolidated Annual Performance and Evaluation Report (CAPER). This document states the objectives and outcomes identified in each Annual Action Plan and includes an evaluation of past performance through measurable goals and objectives relative to actual performance. Prior documents can be found at the Palm Desert City Hall.
4. Summary of Citizen Participation Process and consultation process Summary from citizen participation section of plan.
The City held a public comment period from June 15, 2022, through July 14, 2022. On July 14, 2022, the City Council held a public hearing to provide residents an additional opportunity to review and comment on programming of CDBG funds.
411
Annual Action Plan
2022
2 OMB Control No: 2506-0117 (exp. 09/30/2021)
As part of the Substantial Amendment, the City followed its Citizen’s Input Protocol and issued a Public Comment Period of 30 days and a Public Hearing Notice of 10 days.
5. Summary of public comments
This could be a brief narrative summary or reference an attached document from the Citizen Participation section of the Con Plan.
There were no public comments received during the public review period for both public hearings. However, three (3) members of the public provided comments during the May 3, 2022, Community meeting regarding the CDBG program. Refer to Appendix A for a summary of comments.
6. Summary of comments or views not accepted and the reasons for not accepting them There were no public comments received during the public review period. The City acknowledges and responds to all comments that are submitted.
7. Summary
412
Annual Action Plan
2022
3 OMB Control No: 2506-0117 (exp. 09/30/2021)
PR-05 Lead & Responsible Agencies – 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
Lead Agency PALM DESERT
CDBG Administrator City Manager's Office / City of Palm Desert HOPWA Administrator
HOME Administrator
HOPWA-C Administrator
Table 1 – Responsible Agencies
Narrative (optional)
Consolidated Plan Public Contact Information
413
Annual Action Plan
2022
4 OMB Control No: 2506-0117 (exp. 09/30/2021)
Mr. Angel Cardoz
Financial Management Analyst
73-510 Fred Waring Drive
760-776-6389
414
Annual Action Plan
2022
5 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-10 Consultation – 91.100, 91.200(b), 91.215(l)
1. Introduction
The City followed its HUD-approved Citizen Participation Plan to consult with the public, nonprofit organizations, governmental agencies, and other stakeholders to prepare the Annual Action Plan as required by 24 CRF 91.100.
Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
On May 3, 2022, a community workshop/public hearing was held to receive comments regarding the development of the Annual Action Plan. The City conducted outreach and issued public notices regarding the application process for subrecipient awards as well.
On May 31, 2022, the City's Outside Agency Funding Committee recommended CDBG budget recommendations, which are incorporated into the Annual Action Plan. The City held a 30-day public comment period from June 15, 2022, through July 14, 2022.
On July 14, 2022, the City Council held a public hearing to provide residents an additional opportunity review and comment regarding CDBG funding recommendations. The City Council approved the submission of the Annual Action Plan.
The City submitted the Annual Action Plan on July 19, 2022 via electronic to the City’s HUD representative due not the City not having access as of date to the Integrated Disbursement and Information System (IDIS). The City received access to IDIS from HUD on July 29, 2022. The City submitted the Annual Action Plan into IDIS on August 4, 2022.
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The City is actively involved in multiple activities to address the needs of homeless persons, which include coordination with the Continuum of Care. For example, the City is involved in regional coordination efforts between stakeholders throughout the Coachella Valley and Riverside County.
The City has historically funded homelessness services coordinated regionally through the Coachella Valley Association of Governments (CVAG). For years, the City contributed funds to CVAG for the operation of Roy’s Desert Resource Center, which permanently closed in July 2017. Since then, CVAG has allocated its regional financial commitments for other homelessness services. The City recently 415
Annual Action Plan
2022
6 OMB Control No: 2506-0117 (exp. 09/30/2021)
made another financial commitment in the amount of $100,000 to CVAG to continue to implement homelessness services. A summary of accomplishments can be found at City Hall.
The City operates a homelessness assistance program as well. The program that has a primary focus on homelessness locally. The program contracts with the Riverside University Health System to provide a Behavioral Health Specialists in Palm Desert to focus on providing homelessness services. Please note the County of Riverside coordinates the Continuum of Care as well.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS The City does not receive Emergency Solutions Grant (ESG) funds.
2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
416
Annual Action Plan
2022
7 OMB Control No: 2506-0117 (exp. 09/30/2021)
Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization FAIR HOUSING COUNCIL OF RIVERSIDE COUNTY, INC.
Agency/Group/Organization Type Service-Fair Housing
What section of the Plan was addressed by Consultation? Housing Need Assessment Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (fair housing).
2 Agency/Group/Organization Cove Communities Senior Association dba The Joslyn Center
Agency/Group/Organization Type Services-Elderly Persons What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (elderly persons).
3 Agency/Group/Organization OPERATION SAFEHOUSE, INC.
Agency/Group/Organization Type Services-homeless
What section of the Plan was addressed by Consultation? Homelessness Needs - Unaccompanied youth Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (homeless/unaccompanied youth).
4 Agency/Group/Organization Desert Access and Mobility
Agency/Group/Organization Type Services-Persons with Disabilities What section of the Plan was addressed by Consultation? Non-Homeless Special Needs 417
Annual Action Plan
2022
8 OMB Control No: 2506-0117 (exp. 09/30/2021)
Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide public services (persons with disabilities).
5 Agency/Group/Organization John F. Kennedy Memorial Foundation/Healthy Family Agency/Group/Organization Type Services-Children
What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to construct public facilities and improvements (serving at-risk youth).
6 Agency/Group/Organization DESERT ARC
Agency/Group/Organization Type Services-Persons with Disabilities What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted.
What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to construct public facilities and improvements (serving people with
disabilities).
Identify any Agency Types not consulted and provide rationale for not consulting The City attempts to keep a comprehensive list of stakeholders potentially eligible to receive CDBG funds for activities consistent with the Consolidated Plan goals. As some stakeholders undergo staffing changes, on occasion City staff is unaware of such changes throughout the program year. As a result, some stakeholders may not realize the City is attempting to consult with their organizations during the Annual Action Plan process. To mitigate this concern, City staff updates its contact list annually to ensure proper channels of communication with stakeholders. 418
Annual Action Plan
2022
9 OMB Control No: 2506-0117 (exp. 09/30/2021)
Other local/regional/state/federal planning efforts considered when preparing the Plan Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan?
Continuum of Care
Table 3 – Other local / regional / federal planning efforts Narrative (optional)
419
Annual Action Plan
2022
10 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-12 Participation – 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal-setting On May 3, 2022, a community workshop/public hearing was held to receive comments regarding the development of the Annual Action Plan.
The City conducted outreach and issued public notices regarding the application process for subrecipient awards as well.
On May 31, 2022, the City's Outside Agency Funding Committee recommended CDBG budget recommendations, which are incorporated into the Annual Action Plan. The City held a 30-day public comment period from June 15, 2022, through July 14, 2022.
On July 14, 2022, the City Council held a public hearing to provide residents an additional opportunity review and comment regarding CDBG funding recommendations. The City Council approved the submission of the Annual Action Plan.
The City submitted the Annual Action Plan on August 4, 2022. Please note, the City did not have access to IDIS until July 29, 2022.
Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
1 Public Meeting
Nontargeted/broad
community
6 3 0
2 Public Meeting
Nontargeted/broad
community
0 0 0
420
Annual Action Plan
2022
11 OMB Control No: 2506-0117 (exp. 09/30/2021)
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
3 Public Hearing
Nontargeted/broad
community
0 0 0
Table 4 – Citizen Participation Outreach
421
Annual Action Plan
2022
12 OMB Control No: 2506-0117 (exp. 09/30/2021)
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
This Annual Action Plan represents an allocation from HUD in the amount of $394,525 in CDBG funds for Program Year 2022.
Anticipated Resources
Program Source
of Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
CDBG public -
federal
Acquisition
Admin and
Planning
Economic
Development
Housing
Public
Improvements
Public Services 394,525 0 0 394,525 394,525
As part of the SA in April of 2025, all
remaining resources ($32,467.73) were
allocated to the PY 24 Public Facilities
Upgrades project at the PDHA
Table 5 - Expected Resources – Priority Table
422
Annual Action Plan
2022
13 OMB Control No: 2506-0117 (exp. 09/30/2021)
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
The above sources of funding have been identified as available funds to be leveraged with, where and when possible, nonprofit organizations and other entities awarded CDBG funds to provide assistance to meet the goals and objectives as outlined within the City's Five-Year Consolidated Plan and One-Year Annual Action Plan. Funded organizations will also utilize awarded funds to leverage, where and when possible, dollars available through the organization as well as other grant awards and/or donations to undertake programs/projects that may not otherwise be possible. Organizations have more flexibility to utilize funding more efficiently and effectively to provide needed support services to clients.
423
Annual Action Plan
2022
14 OMB Control No: 2506-0117 (exp. 09/30/2021)
If appropriate, describe publicly owned land or property located within the jurisdiction that may be used to address the needs identified in the plan N/A
Discussion
The City will continue to allocate CDBG funding and other sources of funding when and where available to meet the needs of qualifying individuals as designated by HUD. Programs and projects will be targeted that address goals and objectives identified within the Annual Action Plan and Consolidated Plan. In addition, the funds will be targeted so as to provide the maximize benefit to those in need. 424
Annual Action Plan
2022
15 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
1 Support efforts to
combat
homelessness
2018 2022 Homeless Citywide Homelessness CDBG:
$10,000
Public Facility or Infrastructure
Activities for Low/Moderate
Income Housing Benefit: 10
Households Assisted
2 Enhance public
facilities
2018 2022 Non-Housing
Community
Development
Citywide Public Facilities CDBG:
$263,420
Other: 3 Other
3 Provide support for
public service
programs
2018 2022 Non-Homeless
Special Needs
Citywide Special Needs
Populations
CDBG:
$20,000
Public service activities for
Low/Moderate Income Housing
Benefit: 135 Households Assisted
5 Increase fair
housing activities
2018 2022 Citywide Fair Housing CDBG:
$42,200
Public service activities for
Low/Moderate Income Housing
Benefit: 450 Households Assisted
Table 6 – Goals Summary
Goal Descriptions
425
Annual Action Plan
2022
16 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Goal Name Support efforts to combat homelessness
Goal
Description
Support activities to prevent and end homelessness, such as funding affordable housing opportunities, and resource centers for homeless individuals
2 Goal Name Enhance public facilities
Goal
Description
Improve City of Palm Desert public facilities and infrastructure to benefit residents in low- and moderate-income target areas or those presumed under HUD regulations to be low- and moderate-income such as the elderly and disabled adults.
3 Goal Name Provide support for public service programs Goal
Description
Provide lower-income persons with appropriate health, fitness, recreational, educational, and other services to support the emotional and developmental well-being of low- and moderate-income families 5 Goal Name Increase fair housing activities
Goal
Description
Promote fair housing choice by funding fair housing organizations to provide fair housing services, such as education, tenant-landlord mediation, and testing.
426
Annual Action Plan
2022
17 OMB Control No: 2506-0117 (exp. 09/30/2021)
Projects
AP-35 Projects – 91.220(d)
Introduction
The Annual Action Plan identifies funding the following activities:
Public Services ($52,200)
Public Facilities and Improvements ($263,420)
Program Administration ($78,905)
Projects
# Project Name
1 Public Facilities and Improvements - City of Palm Desert Cahuilla Hills Park ADA Compliance Project
2 Public Facilities and Improvements - Desert Arc
3 Public Service - Desert Access and Mobility
4 Public Facilities and Improvements
5 Public Service - Operation Safehouse
6 Program Administration
7 Fair Housing Council of Riverside County - Administration 8 Administration - CDBG Program
9 Public Facilities and Improvements: Palm Desert Housing Authority Parking Lot Upgrades Table 7 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The City identifies its highest priority needs during its citizen participation process every year and the Consolidated Plan process every five years. Activities are funded annually taking into consideration these highest priority needs. The primary obstacle to address underserved needs in the community is the lack of resources to provide a greater level of assistance. 427
Annual Action Plan
2022
18 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
428
Annual Action Plan
2022
19 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Project Name Public Facilities and Improvements - City of Palm Desert Cahuilla Hills Park ADA Compliance Project
Target Area
Goals Supported Enhance public facilities
Needs Addressed Special Needs Populations
Public Facilities
Funding CDBG: $183,420
Description Funding public facilities and improvements at the City of Palm Desert Cahuilla Hills Park ADA Compliance Project. ADA restroom upgrades, ADA-compliant parking space and trailhead grading/paving to provide ADA accessEligible Activity (Matrix Code): 03F; 03G; 03A. CDBG National Objective: LMC
Target Date 6/30/2023
Estimate the number
and type of families that
will benefit from the
proposed activities
This project will be able to assist approximately 600 low- to moderate income families - 1 facility improvement
Location Description City of Palm Desert Cahuilla Hills Park 45825 Edgehill Dr, Palm Desert, CA 92260
Planned Activities City of Palm Desert Cahuilla Hills Park ($183,420) – ADA restroom upgrades, ADA-compliant parking space and trailhead grading/paving to provide ADA access
2 Project Name Public Facilities and Improvements - Desert Arc Target Area
Goals Supported Enhance public facilities
Needs Addressed Special Needs Populations
Public Facilities
Funding CDBG: $80,000
Description Facility Improvement Project - ADA restroom upgradeEligible Activity (Matrix Code): 03F; 03G; 03A. CDBG National Objective: LMC Target Date 6/30/2023
429
Annual Action Plan
2022
20 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families that
will benefit from the
proposed activities
This project will be able to assit approximately 800 low- to moderate income person with special needs.
Location Description 73255 Country Club Dr, Palm Desert, CA 92260 Planned Activities ADA restroom upgrade
3 Project Name Public Service - Desert Access and Mobility Target Area Citywide
Goals Supported Provide support for public service programs Needs Addressed Special Needs Populations
Funding CDBG: $10,000
Description Transportation services to individuals who are blind, disabled or cannot drive safely.Eligible Activity (Matrix Code): 05A; 05D; 05E; 05J.
CDBG National Objective: LMC
Target Date 6/30/2023
Estimate the number
and type of families that
will benefit from the
proposed activities
This project will assist approximately 75 low- to moderate income special needs individuals.
Location Description 471 E. Tahquitz Canyon Way, Suite 218, Palm Springs, CA 92262 Planned Activities Transportation services to individuals who are blind, disabled or cannot drive safely
4 Project Name Public Facilities and Improvements
Target Area Citywide
Goals Supported Provide support for public service programs Needs Addressed Special Needs Populations
Funding CDBG: $10,000
Description Funding public facilities and improvements at the City of Palm Desert Cahuilla Hills Park ADA Compliance Project ($146,124), Desert ARC ADA Restroom ($30,000), and The Joslyn Center ADA Restroom ($80,000) Eligible Activity (Matrix Code): 03F; 03G; 03A. CDBG National Objective: LMC
Target Date 6/30/2023
430
Annual Action Plan
2022
21 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families that
will benefit from the
proposed activities
The agency will provide homeowner health and safety repairs to approximately 50 elderly owners and/or disabled and 65 years of age or older to their homes.
Location Description 41550 Eclectic Street, Palm Desert, CA 92260 Planned Activities Homeowner health and safety repairs to elderly owners and/or disabled and 65 years of age or older to their homes.
5 Project Name Public Service - Operation Safehouse
Target Area Citywide
Goals Supported Provide support for public service programs Needs Addressed Special Needs Populations
Funding CDBG: $10,000
Description Case management services for homeless youth at a transitional living facilityEligible Activity (Matrix Code): 05A; 05D; 05E; 05J. CDBG National Objective: LMC
Target Date 6/30/2023
Estimate the number
and type of families that
will benefit from the
proposed activities
Case management services for 10 homeless youth at a transitional living facility
Location Description 9685 Hayes Street, Riverside, CA 92503 Planned Activities Case management services for homeless youth at a transitional living facility
6 Project Name Program Administration
Target Area Citywide
Goals Supported Increase fair housing activities
Needs Addressed Fair Housing
Funding CDBG: $22,200
Description Program Administration ($78,780) Eligible Activity (Matrix Code): 21A.
CDBG National Objective: LMCPlanning and Administration: CDBG Citation: 570.206(a)
Target Date 6/30/2023
431
Annual Action Plan
2022
22 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families that
will benefit from the
proposed activities
Provide 450 indivuduals/families with fair housing and
tenant/landlord disputes.
Location Description 4164 Brockton Avenue, Riverside, CA 92501 Planned Activities Mandated fair housing services
7 Project Name Fair Housing Council of Riverside County - Administration Target Area Citywide
Goals Supported Increase fair housing activities
Needs Addressed Fair Housing
Funding CDBG: $20,000
Description Program administration of Fair Housing programEligible Activity (Matrix Code): 05A; 05D; 05E; 05J. CDBG National Objective: LMC Target Date 6/30/2023
Estimate the number
and type of families that
will benefit from the
proposed activities
Provide 450 indivuduals/families with fair housing and
tenant/landlord disputes.
Location Description 4164 Brockton Avenue, Riverside, CA 92501 Planned Activities Provide 450 indivuduals/families with fair housing and tenant/landlord disputes.
8 Project Name Administration - CDBG Program
Target Area Citywide
Goals Supported Enhance public facilities
Provide support for public service programs
Increase fair housing activities
Needs Addressed Special Needs Populations
Low-to-Moderate Income Housing
Public Facilities
Fair Housing
Funding CDBG: $58,905
Description Planning and Administration of CDBG grant programCDBG Citation:
570.206(a)
Target Date 6/30/2023
432
Annual Action Plan
2022
23 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families that
will benefit from the
proposed activities
Not Applicable
Location Description 73510 Fred Waring Drive, Palm Desert, CA 92260 Planned Activities Planning and administration of the CDBG program 9 Project Name Public Facilities- PD Housing Authority
Target Area Citywide
Goals Supported Enhance public facilities
Needs Addressed Low-to-Moderate Income Housing
Public Facilities
Funding CDBG: ($32,467.73)
Description Public Facilities Improvements- Parking Lot Upgrades at Public Housing Facility
Target Date 5/1/2025
Estimate the number
and type of families that
will benefit from the
proposed activities
250 Public Housing Authority residents
Location Description
Planned Activities Parking Lot Improvements
433
Annual Action Plan
2022
24 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City of Palm Desert is located in Riverside County; particularly, the Coachella Valley. Historically, the City has not had any low- and moderate-income census tracts; however, the City now has two eligible census tracts as of recently (ACS data). CDBG funds will be used for low- and moderate-income clientele (or presumed benefit).
Geographic Distribution
Target Area Percentage of Funds
Citywide 100
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically The City has not historically funded CDBG activities based upon geographic areas since there have not been eligible low and moderate-income census tracts; however, HUD recently revised the census criteria used to determine eligibility. As a result, the City now has two CDBG-eligible census tracts. City staff is currently exploring the possibility of a Section 108 Loan for City Council’s consideration in subsequent program years.
Discussion
N/A
434
Annual Action Plan
2022
25 OMB Control No: 2506-0117 (exp. 09/30/2021)
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
The City is not undertaking any CBDG-funded housing activities in the program year.
One Year Goals for the Number of Households to be Supported Homeless 10
Non-Homeless 450
Special-Needs 135
Total 595
Table 9 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 0
The Production of New Units 0
Rehab of Existing Units 0
Acquisition of Existing Units 0
Total 0
Table 10 - One Year Goals for Affordable Housing by Support Type Discussion
N/A
435
Annual Action Plan
2022
26 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-60 Public Housing – 91.220(h)
Introduction
The City will not undertake activities that address public housing in the program year.
Actions planned during the next year to address the needs to public housing Not Applicable. The City does not own nor operate public housing.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
Not Applicable. The City does not own nor operate public housing.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not Applicable. The City does not own nor operate public housing.
Discussion
Not Applicable. The City does not own nor operate public housing. 436
Annual Action Plan
2022
27 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
The City will continue to work with nonprofit organizations, government agencies, and other stakeholders to fund activities that help prevent and reduce homelessness.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The City operates a homelessness assistance program as well. The program that has a primary focus on homelessness locally. The program contracts with the Riverside University Health System to provide a Behavioral Health Specialists in Palm Desert to focus on providing homelessness services.
Addressing the emergency shelter and transitional housing needs of homeless persons The Housing First approach adopted by the County and CoC requires that homeless are helped into permanent housing or rapid re-housing as soon as possible. Transitional housing beds have begun to decrease countywide and permanent housing is increasing because of reallocations made in the HUD CoC Program Consolidated Application and the CoC’s success in obtaining new funding for permanent supportive housing. Both transitional housing and emergency shelters focus on lessening the time that a homeless person or family’s length of time homeless (LOTH) in the shelter by effective and quick assessment of homeless clients and getting them stabilized into permanent housing with intensive case management initially and support in the initial phase of residency in permanent housing. This period will serve as a time to address the other needs to maintain self-sufficiency either by accessing mainstream benefits, employment or medical or mental health support.
The CoC collaborates with the City and other stakeholders to integrate CoC programs, Emergency Solutions Grant (ESG), Social Services to Veteran Families (SSVF), and CDBG funding to increase the number of persons with rapid re-housing assistance. Also, other non-McKinney-Vento funding sources, such as Emergency Food and Shelter Program (EFSP), funded under Federal Emergency Management Agency (FEMA) will be matched as a source for rental / mortgage assistance for families that are homeless or at-risk of homelessness in the County’s strategy to meet this goal.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were 437
Annual Action Plan
2022
28 OMB Control No: 2506-0117 (exp. 09/30/2021)
recently homeless from becoming homeless again
The CoC implemented a Coordinated Entry System (CES) to assess homeless persons using the VI-SPDAT that tracks the length of time a client has been on the streets or in an emergency shelter. DPSS uses HUD’s CoC Program planning grant funding to measure system-wide performance in HMIS, such as length of time homeless. This is used to help the CoC prioritize and house those with longest length of time homeless. The planning process also included working with the CoC Standards and Evaluation Committee to continue developing strategies to prioritize persons with longest time homeless and most severe needs, including:
The CoC has also adopted a Housing First approach that is evidenced-based and endorsed by HUD to place a homeless person in permanent housing and provide supportive services intended to keep them stably housed.
Homeless CoC youth providers have implemented outreach and service-based events in the communities to draw homeless youth, unaccompanied and transitional age into contact with services available to them. The Operation SafeHouse is the only CoC youth provider that has opened a permanent supportive housing program called the Harrison House, which is for transitional age youth, in the eastern desert region of Riverside County.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The CoC Discharge Policy is mandated by the State and followed by the CoC. The CoC established a Discharge Planning Committee, responsible for implementing policies and protocols and coordinating with various organizations, to ensure that persons being discharged from a publicly funded institution or system of care are not discharged immediately into homelessness. The goals are to identify discharge housing needs inclusive of housing and supportive services and to link the individual with community resources that will include mental health services, substance abuse support, and housing. The Hospital Association of Southern California Inland Area serves as the lead agency on the Discharge Planning Committee to facilitate communication regarding the discharge planning needs of homeless persons from acute care hospitals. The Riverside County University Health System – Behavioral Health, collaborates with DPSS and the CoC in the coordination and implementation of discharge planning for homeless individuals disabled by a serious mental health and/or substance abuse disorder(s). Foster Care and extended foster care programs help transition dependent youth who are emancipating from foster care to independent living. The Department of Public Social Services, Riverside Sheriff’s, and Probation Department support the Continuum of Care’s mission of working towards reintegrating 438
Annual Action Plan
2022
29 OMB Control No: 2506-0117 (exp. 09/30/2021)
persons leaving correctional facilities to community-based living and self-sufficiency.
Discussion
N/A
439
Annual Action Plan
2022
30 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing – 91.220(j)
Introduction:
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Discussion:
N/A
440
Annual Action Plan
2022
31 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions – 91.220(k)
Introduction:
The City will continue to work with various stakeholders to meet the needs of its residents that remain in-need of CDBG-eligible activities consistent with Consolidated Plan goals.
Actions planned to address obstacles to meeting underserved needs The City will continue to work toward the reduction/elimination of obstacles to meet underserved needs through the funding of various organizations that are established to provide direct services to those in need. The City is not equipped to provide direct services; therefore, funding organizations that do is essential to our success in addressing the identified goals and objectives. The City will continue to partner with service providers to address obstacles and address barriers that exist. In addition, the City works with the County of Riverside, the CoC, local agencies, nonprofits, etc. to address various aspects related to CoC programs and activities, as well as obstacles that face the underserved in general.
However, the CoC addresses issues relative to homelessness, mental and physical illnesses, domestic violence, etc. and has a wide range of members where collaboration in other areas is an option. Through these working relationships, obstacles such as lack of communication between agencies, improved services, limited resources, tracking and monitoring, and other needed resources are obtained, gaps in services are better identified, and there is a more cohesive approach to identifying and resolving issues.
Actions planned to foster and maintain affordable housing The City and the Palm Desert Housing Authority will continue to maintain the existing affordable housing stock through the funding sources identified previously; however, as noted with the elimination of redevelopment agencies, there is no longer what is considered “20% Set Aside Funds”. Therefore, maintaining existing properties and programs will be the primary focus, provided funding is available, for some time to come. However, new projects and programs will be planned and implemented where and when possible.
Actions planned to reduce lead-based paint hazards
The City’s Building & Safety and Housing departments distribute informational pamphlets on Lead Based Paint Hazards and refer all calls to the County of Riverside Environmental Health Department. The City addresses this issue on a case-by-case basis through multiple steps.
Actions planned to reduce the number of poverty-level families The City is continuing to team up with service providers to provide assistance for poverty level families, including funding food and services options during the Program Year. In addition, the City will seek out additional partnerships for programs that encourage self-sufficiency including employment and training, 441
Annual Action Plan
2022
32 OMB Control No: 2506-0117 (exp. 09/30/2021)
housing options, and safety net programs.
Actions planned to develop institutional structure
The City will continue to work with outside agencies to maintain and develop relationships, including with nonprofit organizations, private businesses, the CoC, and nonprofit organizations in the region.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to work with various County departments, agencies, and nonprofit organizations to identify and carry out goals and objectives of the CDBG Program, and to create a more cooperative working relationship with all interested parties. The City invites these groups to attend public hearings, community meetings, and special meetings that address specific programs and projects. The City has an approved Citizen’s Participation Plan that it follows in this regard. In addition, City staff regularly attends CoC meetings that involve multiple organizations and various County Departments as well as other local jurisdictions wherein discussions are held on homelessness as well as supportive services to other at-risk groups of individuals and families.
Discussion:
N/A
442
Annual Action Plan
2022
33 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
Activities planned with CDBG funds expected to be available during the year are identified in the project tables. The following identifies program income that is available for use that is included in projects to be carried out.
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0
2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 0
5. The amount of income from float-funded activities 0
Total Program Income: 0
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income.Overall Benefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 70.00% 443
Annual Action Plan
2022
34 OMB Control No: 2506-0117 (exp. 09/30/2021)
N/A
444
Annual Action Plan
2022
35 OMB Control No: 2506-0117 (exp. 09/30/2021)
445
446
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 1 OMB Control No: 2506-0117 (exp. 09/30/2021)
SA2: Substantial Amendment to request to reallocate remaining unused Admin funds ($50k) to Joslyn Center ADA restroom project for a total of $180k in Public Facility Funding as part of SA2- April 2025 Previous SA: Request to add $50k to Joslyn Center ADA project for a total of $130k as part of SA1- Approved November 2024 Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
Anticipated Resources
Program Source of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder of
ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
CDBG public -
federal
Acquisition
Admin and
Planning
Economic
Development
Housing
Public
Improvements
Public Services 393,904.00 0.00 0.00 393,904.00 1,575,616.00 As part of SA2- $50k in
remaining funds allocated to
Joslyn Center for ADA
restroom project.
447
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 2 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Source of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder of
ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
HOME public -
federal
Acquisition
Homebuyer
assistance
Homeowner rehab
Multifamily rental
new construction
Multifamily rental
rehab
New construction
for ownership
TBRA 0.00 0.00 0.00 0.00 0.00
Table 1 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
In addition, the County of Riverside Adult Services/Homeless Unit and CoC Collaborative Applicant has funding allocated for (1) Emergency Shelter, (2) Prevention, (3) Rapid Rehousing, (4) Outreach, (5) HMIS/data collection, and (6) ESG Administration. The City continues to provide its allocation of ProRata Share funding to the County for distribution through the CoC; however, the County has indicated that it is unable to provide the City with the dollar amount of its share, but does recognize that the City is participating.
Palm Desert Housing Authority Revenue (Program) Income: (Formerly referred to as Redevelopment Housing SetAside Funds): Formerly, SetAside Funds were used for housing activities such as acquisition, rehabilitation, new construction, rental assistance, and the Homebuyers own Payment Assistance Program. The Palm Desert Housing Authority is the housing successor entity established to preserve existing housing units and affordability of its current portfolio; however, funding is limited to revenues derived from the properties and 448
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 3 OMB Control No: 2506-0117 (exp. 09/30/2021)
programs (rents, sales, payoffs, etc.).
449
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 4 OMB Control No: 2506-0117 (exp. 09/30/2021)
If appropriate, describe publicly owned land or property located within the jurisdiction that may be used to address the needs identified in the plan
NOT APPLICABLE
Discussion
The City will continue to allocate CDBG funding and other sources of funding when and where available to meet the needs of qualifying individuals as designated by HUD. Programs and projects will be targeted that address goals and objectives identified within the Annual Action Plan and Consolidated Plan. In addition, the funds will be targeted so as to provide the maximize benefit to those in need. 450
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 5 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
1 Support Essential
Senior Services
2023 2028 Non-Homeless
Special Needs
Citywide Affordable Senior
Housing (Increase)
Increase Senior
Services and
Programming
Senior
Transportation
(Enhance Options)
CDBG:
$150,000.00
Public service activities other
than Low/Moderate Income
Housing Benefit: 3000 Persons
Assisted
2 Support Public and
Community
Facilities
Improvement
2023 2028 Non-Housing
Community
Development
Citywide Senior
Transportation
(Enhance Options)
CDBG:
$1,256,124.00
Public Facility or Infrastructure
Activities for Low/Moderate
Income Housing Benefit:
50000 Households Assisted
3 Preserve and
Enhance Affordable
Housing
2023 2028 Affordable
Housing
Citywide Affordable Senior
Housing (Increase)
Increase
Affordable Housing
Reduce vacancies
in the City
Rental Assistance
CDBG:
$100,000.00
Public service activities for
Low/Moderate Income
Housing Benefit: 5 Households
Assisted
451
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 6 OMB Control No: 2506-0117 (exp. 09/30/2021)
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
4 Support Fair
Housing Initiatives
2023 2028 Citywide Reduce vacancies
in the City
Rental Assistance
CDBG:
$21,500.00
Public service activities other
than Low/Moderate Income
Housing Benefit: 500 Persons
Assisted
5 Fund Vital
Community and
Homeless Services
2023 2028 Homeless Citywide Increase Senior
Services and
Programming
CDBG:
$42,500.00
Homeless Person Overnight
Shelter: 300 Persons Assisted
Homelessness Prevention:
2000 Persons Assisted
Table 2 – Goals Summary
Goal Descriptions
1 Goal Name Support Essential Senior Services
Goal Description
2 Goal Name Support Public and Community Facilities Improvement Goal Description
3 Goal Name Preserve and Enhance Affordable Housing
Goal Description
4 Goal Name Support Fair Housing Initiatives
Goal Description
5 Goal Name Fund Vital Community and Homeless Services
Goal Description
452
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 7 OMB Control No: 2506-0117 (exp. 09/30/2021)
Projects
AP-35 Projects – 91.220(d)
Introduction
The Annual Action Plan identifies funding the following activities:
Public Services ($59,000)
Public Facilities and Improvements ($306,124 amount increased as part of SA1; SA2) Program Administration ($38,780 amount decreased and funds rolled to Public Facilities and Improvements as part of SA2)
Projects
# Project Name
1 Public Service
2 Public Facilities and Improvements
3 Program Administration
Table 3 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The City identifies its highest priority needs during its citizen participation process every year and the Consolidated Plan process every five years. Activities are funded annually taking into consideration these highest priority needs. The primary obstacle to address underserved needs in the community is the lack of resources to provide a greater level of assistance. 453
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 8 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
454
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 9 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Project Name Public Service
Target Area Citywide
Goals Supported Support Fair Housing Initiatives
Fund Vital Community and Homeless Services
Needs Addressed Reduce vacancies in the City
Funding CDBG: $59,000.00
Description Desert Aids Project ($10,000), Elder Love USA, Inc. ($19,000), Fair Housing Council of Riverside County ($21,500), and Operation SafeHouse ($8,500).Eligible Activity (Matrix Code): 05A; 05D; 05E; 05J.
CDBG National Objective: LMC
Target Date 6/30/2024
Estimate the number
and type of families
that will benefit from
the proposed activities
Desert Aids Project: 130
Elder Love USA, Inc: 25
Fair Housing Council of Riverside County: 500
Operation SafeHouse: 10
Location Description Desert Aids Project: 1695 N. Sunrise Way Palm Springs, CA 92262 Elder Love USA, Inc.: 41550 Ecclectic Street, Palm Desert, CA 92260 Fair Housing Council of Riverside County: 3933 Mission Inn Avenue, Ste. 100, Riverside, CA 92501
Operation SafeHouse: 9685 Hayes Street, Riverside, CA 92503 Planned Activities Desert Aids Project: the program transforms the lives of low-income, under-employed HIV-positive clients.
Elder Love USA, Inc.: The agency will provide homeowner health and safety repairs to elderly owners and/or disabled and 65 years of age or older to their homes
Fair Housing Council of Riverside County: Mandated fair housing services
Operation SafeHouse: Case management services for homeless youth at a transitional living facility
2 Project Name Public Facilities and Improvements
Target Area Citywide
Goals Supported Support Public and Community Facilities Improvement Preserve and Enhance Affordable Housing
Needs Addressed Increase Affordable Housing
455
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 10 OMB Control No: 2506-0117 (exp. 09/30/2021)
Funding CDBG: $256,124.00
Description Funding public facilities and improvements at the City of Palm Desert Cahuilla Hills Park ADA Compliance Project ($146,124), Desert ARC ADA Restroom ($30,000), and The Joslyn Center ADA Restroom ((added $50k for a total of $130k as part of SA1)) ((added additional $50k for a total of $180k as part of SA2)) Eligible Activity (Matrix Code): 03F; 03G; 03A.
CDBG National Objective: LMC
Target Date 6/30/2024
Estimate the number
and type of families
that will benefit from
the proposed activities
Cahuilla Hills Park ADA Compliance: 1 facility improvement Desert ARC: 1 facility improvement
The Joslyn Center: 1 facility improvement
Location Description City of Palm Desert Cahuilla Hills Park: 45-825 Edgehill Drive, Palm Desert, CA 92260
Desert ARC: 73-255 Country Club Dr, Palm Desert, CA 92260 The Joslyn Center: 73-750 Catalina Way, Palm Desert, CA 92260 Planned Activities City of Palm Desert Cahuilla Hills Park ($146,124) – ADA restroom upgrades, ADA-compliant parking space and trailhead grading/paving to provide ADA access
Desert ARC ($30,000) – ADA restroom upgrade
The Joslyn Center ($130,000) – ADA restroom upgrade (added $50k for a total of $130k as part of SA1) ((added $50k for a total of $180k as part of SA2))
3 Project Name Program Administration
Target Area Citywide
Goals Supported Support Public and Community Facilities Improvement Preserve and Enhance Affordable Housing
Needs Addressed Increase Affordable Housing
Funding CDBG: $78,780.00 reduced to $28,780 and remaining funds transferred to Public Facilities Improvements, The Joslyn Center as part of SA2 Description Program Administration ($78,780) Eligible Activity (Matrix Code): 21A.
CDBG National Objective: Planning and Administration: CDBG Citation:
570.206(a)
Target Date 6/30/2024
456
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 11 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families
that will benefit from
the proposed activities
Program Administration: N/A
Location Description Program Administration: 73510 Fred Waring Drive, Palm Desert, CA 92260
Planned Activities
457
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 12 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City of Palm Desert is located in Riverside County; particularly, the Coachella Valley. Historically, the City has not had any low- and moderate-income census tracts; however, the City now has two eligible census tracts as of recently (ACS data). CDBG funds will be used for low- and moderate-income clientele (or presumed benefit).
Geographic Distribution
Target Area Percentage of Funds
Citywide 100
Table 4 - Geographic Distribution
Rationale for the priorities for allocating investments geographically The City has not historically funded CDBG activities based upon geographic areas since there have not been eligible low and moderate-income census tracts; however, HUD recently revised the census criteria used to determine eligibility. As a result, the City now has two CDBG-eligible census tracts. City staff is currently exploring the possibility of a Section 108 Loan for City Council’s consideration in subsequent program years.
Discussion
NOT APPLICABLE
458
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 13 OMB Control No: 2506-0117 (exp. 09/30/2021)
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
The City will not undertake any projects to address affordable housing in the 2023 Program Year.
One Year Goals for the Number of Households to be Supported Homeless 0
Non-Homeless 0
Special-Needs 0
Total 0
Table 5 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 0
The Production of New Units 0
Rehab of Existing Units 0
Acquisition of Existing Units 0
Total 0
Table 6 - One Year Goals for Affordable Housing by Support Type Discussion
459
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 14 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-60 Public Housing – 91.220(h)
Introduction
The City will not undertake activities that address public housing in the program year.
Actions planned during the next year to address the needs to public housing Not Applicable. The City does not own nor operate public housing.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
Not Applicable. The City does not own nor operate public housing.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not Applicable. The City does not own nor operate public housing.
Discussion
Not Applicable. The City does not own nor operate public housing. 460
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 15 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
The City will continue to work with nonprofit organizations, government agencies, and other stakeholders to fund activities that help prevent and reduce homelessness.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The County of Riverside CoC has established chronically homeless persons as the highest need priority based on the goals HUD has established in its Opening Doors Federal and Strategic Plan to Prevent and End Homelessness. The CoC has implemented a Coordinated Entry System (CES) to ensure appropriate intervention is utilized to serve those who are homeless and providing for a prioritization of vulnerability and linkage to community resources and housing based on the vulnerability prioritization. Within the CoC, there are several outreach teams from County, cities, and nonprofit homeless providers that cover specific populations or geographic regions in the County. There is also specific outreach teams serving the mentally ill, veterans, youth and chronic homeless. The Behavioral Health Systems Department has outreach peer specialists that perform initial field assessments, in depth assessments, referrals to all contacts, linkage to various community organizations.
Addressing the emergency shelter and transitional housing needs of homeless persons The Housing First approach adopted by the County and CoC requires that homeless are helped into permanent housing or rapid re-housing as soon as possible. Transitional housing beds have begun to decrease countywide and permanent housing is increasing because of reallocations made in the HUD CoC Program Consolidated Application and the CoC’s success in obtaining new funding for permanent supportive housing. Both transitional housing and emergency shelters focus on lessening the time that a homeless person or family’s length of time homeless (LOTH) in the shelter by effective and quick assessment of homeless clients and getting them stabilized into permanent housing with intensive case management initially and support in the initial phase of residency in permanent housing. This period will serve as a time to address the other needs to maintain self-sufficiency either by accessing mainstream benefits, employment or medical or mental health support.
The CoC collaborates with the City and other stakeholders to integrate CoC programs, Emergency Solutions Grant (ESG), Social Services to Veteran Families (SSVF), and CDBG funding to increase the number of persons with rapid re-housing assistance. Also, other non-McKinney-Vento funding sources, such as Emergency Food and Shelter Program (EFSP), funded under Federal Emergency Management Agency (FEMA) will be matched as a source for rental / mortgage assistance for families that are 461
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 16 OMB Control No: 2506-0117 (exp. 09/30/2021)
homeless or at-risk of homelessness in the County’s strategy to meet this goal.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again
The CoC implemented a Coordinated Entry System (CES) to assess homeless persons using the VI-SPDAT that tracks the length of time a client has been on the streets or in an emergency shelter. DPSS uses HUD’s CoC Program planning grant funding to measure system-wide performance in HMIS, such as length of time homeless. This is used to help the CoC prioritize and house those with longest length of time homeless. The planning process also included working with the CoC Standards and Evaluation Committee to continue developing strategies to prioritize persons with longest time homeless and most severe needs, including:
The CoC has also adopted a Housing First approach that is evidenced-based and endorsed by HUD to place a homeless person in permanent housing and provide supportive services intended to keep them stably housed.
Homeless CoC youth providers have implemented outreach and service-based events in the communities to draw homeless youth, unaccompanied and transitional age into contact with services available to them. The Operation SafeHouse is the only CoC youth provider that has opened a permanent supportive housing program called the Harrison House, which is for transitional age youth, in the eastern desert region of Riverside County.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The CoC Discharge Policy is mandated by the State and followed by the CoC. The CoC established a Discharge Planning Committee, responsible for implementing policies and protocols and coordinating with various organizations, to ensure that persons being discharged from a publicly funded institution or system of care are not discharged immediately into homelessness. The goals are to identify discharge housing needs inclusive of housing and supportive services and to link the individual with community resources that will include mental health services, substance abuse support, and housing. The Hospital Association of Southern California Inland Area serves as the lead agency on the Discharge Planning 462
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 17 OMB Control No: 2506-0117 (exp. 09/30/2021)
Committee to facilitate communication regarding the discharge planning needs of homeless persons from acute care hospitals. The Riverside County University Health System – Behavioral Health, collaborates with DPSS and the CoC in the coordination and implementation of discharge planning for homeless individuals disabled by a serious mental health and/or substance abuse disorder(s). Foster Care and extended foster care programs help transition dependent youth who are emancipating from foster care to independent living. The Department of Public Social Services, Riverside Sheriff’s, and Probation Department support the Continuum of Care’s mission of working towards reintegrating persons leaving correctional facilities to community-based living and self-sufficiency.
Discussion
NOT APPLICABLE
463
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 18 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing – 91.220(j)
Introduction:
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Discussion:
NOT APPLICABLE
464
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 19 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions – 91.220(k)
Introduction:
The City will continue to work with various stakeholders to meet the needs of its residents that remain in-need of CDBG-eligible activities consistent with Consolidated Plan goals.
Actions planned to address obstacles to meeting underserved needs The City will continue to work toward the reduction/elimination of obstacles to meet underserved needs through the funding of various organizations that are established to provide direct services to those in need. The City is not equipped to provide direct services; therefore, funding organizations that do is essential to our success in addressing the identified goals and objectives. The City will continue to partner with service providers to address obstacles and address barriers that exist. In addition, the City works with the County of Riverside, the CoC, local agencies, nonprofits, etc. to address various aspects related to CoC programs and activities, as well as obstacles that face the underserved in general.
However, the CoC addresses issues relative to homelessness, mental and physical illnesses, domestic violence, etc. and has a wide range of members where collaboration in other areas is an option. Through these working relationships, obstacles such as lack of communication between agencies, improved services, limited resources, tracking and monitoring, and other needed resources are obtained, gaps in services are better identified, and there is a more cohesive approach to identifying and resolving issues.
Actions planned to foster and maintain affordable housing The City and the Palm Desert Housing Authority will continue to maintain the existing affordable housing stock through the funding sources identified previously; however, as noted with the elimination of redevelopment agencies, there is no longer what is considered “20% Set Aside Funds”. Therefore, maintaining existing properties and programs will be the primary focus, provided funding is available, for some time to come. However, new projects and programs will be planned and implemented where and when possible.
Actions planned to reduce lead-based paint hazards
The City’s Building & Safety and Housing departments distribute informational pamphlets on Lead Based Paint Hazards and refer all calls to the County of Riverside Environmental Health Department. The City addresses this issue on a case-by-case basis through multiple steps.
Actions planned to reduce the number of poverty-level families The City is continuing to team up with service providers to provide assistance for poverty level families, including funding food and services options during the Program Year. In addition, the City will seek out additional partnerships for programs that encourage self-sufficiency including employment and training, 465
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 20 OMB Control No: 2506-0117 (exp. 09/30/2021)
housing options, and safety net programs.
Actions planned to develop institutional structure
The City will continue to work with outside agencies to maintain and develop relationships, including with nonprofit organizations, private businesses, the CoC, and nonprofit organizations in the region.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to work with various County departments, agencies, and nonprofit organizations to identify and carry out goals and objectives of the CDBG Program, and to create a more cooperative working relationship with all interested parties. The City invites these groups to attend public hearings, community meetings, and special meetings that address specific programs and projects. The City has an approved Citizen’s Participation Plan that it follows in this regard. In addition, City staff regularly attends CoC meetings that involve multiple organizations and various County Departments as well as other local jurisdictions wherein discussions are held on homelessness as well as supportive services to other at-risk groups of individuals and families.
Discussion:
The City completed in Analysis of Impediments for Fair Housing Choice (AI). The City identified the following Goals to address contributing factors/impediments to fair housing:
• Goal #1: Support Non-Discriminatory Leading Practices • Goal #2: Preserve existing housing stock
• Goal #3: Support the prevention of housing discrimination • Goal #4: Support home ownership
• Goal #5: Support the development of affordable housing • Goal #6: Update land use policies and practices to facilitate development of affordable housing • Goal #7: Improve collaboration with regional organizations agencies 466
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 21 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0
2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 0
5. The amount of income from float-funded activities 0
Total Program Income: 0
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income.Overall Benefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 0.00% HOME Investment Partnership Program (HOME)
Reference 24 CFR 91.220(l)(2)
1. A description of other forms of investment being used beyond those identified in Section 92.205 is as follows:
Not applicable
2. A description of the guidelines that will be used for resale or recapture of HOME funds when used 467
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 22 OMB Control No: 2506-0117 (exp. 09/30/2021)
for homebuyer activities as required in 92.254, is as follows:
Not applicable
3. A description of the guidelines for resale or recapture that ensures the affordability of units acquired with HOME funds? See 24 CFR 92.254(a)(4) are as follows:
Not applicable
4. Plans for using HOME funds to refinance existing debt secured by multifamily housing that is rehabilitated with HOME funds along with a description of the refinancing guidelines required that will be used under 24 CFR 92.206(b), are as follows:
Not applicable
5. If applicable to a planned HOME TBRA activity, a description of the preference for persons with special needs or disabilities. (See 24 CFR 92.209(c)(2)(i) and CFR 91.220(l)(2)(vii)).
Not applicable
6. If applicable to a planned HOME TBRA activity, a description of how the preference for a specific category of individuals with disabilities (e.g. persons with HIV/AIDS or chronic mental illness) will narrow the gap in benefits and the preference is needed to narrow the gap in benefits and services received by such persons. (See 24 CFR 92.209(c)(2)(ii) and 91.220(l)(2)(vii)).
Not applicable
7. If applicable, a description of any preference or limitation for rental housing projects. (See 24 CFR
92.253(d)(3) and CFR 91.220(l)(2)(vii)). Note: Preferences cannot be administered in a manner that limits the opportunities of persons on any basis prohibited by the laws listed under 24 CFR 5.105(a).
Not applicable
468
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 23 OMB Control No: 2506-0117 (exp. 09/30/2021)
Housing Trust Fund (HTF)
Reference 24 CFR 91.220(l)(5)
1. Distribution of Funds
a. Describe the eligibility requirements for recipients of HTF funds (as defined in 24 CFR § 93.2). b. Describe the jurisdiction’s application requirements for eligible recipients to apply for HTF funds. c. Describe the selection criteria that the jurisdiction will use to select applications submitted by eligible recipients.
d. Describe the jurisdiction’s required priority for funding based on geographic distribution, which is a description of the geographic areas of the State (including areas of low-income and minority concentration) in which it will direct assistance during the ensuing program year. e. Describe the jurisdiction’s required priority for funding based on the applicant's ability to obligate HTF funds and undertake eligible activities in a timely manner. f. Describe the jurisdiction’s required priority for funding based on the extent to which rents for units in the rental project are affordable to extremely low-income families. g. Describe the jurisdiction’s required priority for funding based on the financial feasibility of the project beyond the required 30-year period.
h. Describe the jurisdiction’s required priority for funding based on the merits of the application in 469
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 24 OMB Control No: 2506-0117 (exp. 09/30/2021)
meeting the priority housing needs of the jurisdiction (such as housing that is accessible to transit or employment centers, housing that includes green building and sustainable development features, or housing that serves special needs populations).
i. Describe the jurisdiction’s required priority for funding based on the location of existing affordable housing.
j. Describe the jurisdiction’s required priority for funding based on the extent to which the application makes use of non-federal funding sources.
2. Does the jurisdiction’s application require the applicant to include a description of the eligible activities to be conducted with HTF funds?
3. Does the jurisdiction’s application require that each eligible recipient certify that housing units assisted with HTF funds will comply with HTF requirements?
4. Performance Goals and Benchmarks. The jurisdiction has met the requirement to provide for performance goals, consistent with the jurisdiction’s goals established under 24 CFR 91.215(b)(2), by including HTF in its housing goals in the housing table on the SP-45 Goals and AP-20 Annual Goals and Objectives screens.
5. Rehabilitation Standards. The jurisdiction must establish rehabilitation standards for all HTF-assisted housing rehabilitation activities that set forth the requirements that the housing must meet upon project completion. The jurisdiction’s description of its standards must be in sufficient detail to determine the required rehabilitation work including methods and materials. The standards may refer to applicable codes or they may establish requirements that exceed the minimum requirements of the codes. The jurisdiction must attach its rehabilitation standards below. If the jurisdiction will not use HTF funds for the rehabilitation of housing, enter “N/A”.
In addition, the rehabilitation standards must address each of the following: health and safety; major systems; lead-based paint; accessibility; disaster mitigation (where relevant); state and local codes, ordinances, and zoning requirements; Uniform Physical Condition Standards; Capital Needs Assessments (if applicable); and broadband infrastructure (if applicable).
6. Resale or Recapture Guidelines. Below, the jurisdiction must enter (or attach) a description of the 470
City of Palm Desert PY 2023 Draft Annual Action Plan w. Substantial Amendment 2 25 OMB Control No: 2506-0117 (exp. 09/30/2021)
guidelines that will be used for resale or recapture of HTF funds when used to assist first-time homebuyers. If the jurisdiction will not use HTF funds to assist first-time homebuyers, enter “N/A”.
7. HTF Affordable Homeownership Limits. If the jurisdiction intends to use HTF funds for homebuyer assistance and does not use the HTF affordable homeownership limits for the area provided by HUD, it must determine 95 percent of the median area purchase price and set forth the information in accordance with §93.305. If the jurisdiction will not use HTF funds to assist first-time homebuyers, enter “N/A”.
8. Limited Beneficiaries or Preferences. Describe how the jurisdiction will limit the beneficiaries or give preferences to a particular segment of the extremely low- or very low-income population to serve unmet needs identified in its consolidated plan or annual action plan. If the jurisdiction will not limit the beneficiaries or give preferences to a particular segment of the extremely low- or very low-income population, enter “N/A.”
Any limitation or preference must not violate nondiscrimination requirements in § 93.350, and the jurisdiction must not limit or give preferences to students. The jurisdiction may permit rental housing owners to limit tenants or give a preference in accordance with § 93.303 only if such limitation or preference is described in the action plan.
9. Refinancing of Existing Debt. Enter or attach the jurisdiction’s refinancing guidelines below. The guidelines describe the conditions under which the jurisdiction will refinance existing rental housing project debt. The jurisdiction’s refinancing guidelines must, at minimum, demonstrate that rehabilitation is the primary eligible activity and ensure that this requirement is met by establishing a minimum level of rehabilitation per unit or a required ratio between rehabilitation and refinancing. If the jurisdiction will not refinance existing debt, enter “N/A.” <TYPE=[section 9 end]>
Discussion:
471
472
Annual Action Plan
2024
1 OMB Control No: 2506-0117 (exp. 09/30/2021)
A Substantial Amendment has been requested in April, 2025 to fully allocated all unspent CDBG funds by repositioning funds with eligible projects. This includes the change in funding for the previously approved PY2024 Desert Arc Project to being fully funded with PY20 CDBG-CV funds in the amount of $180,000 as part of PY20 SA4. PY24 SA1 also includes the funding of the Palm Desert Housing Authority Public Facilities Improvements Project- Parking Lot Upgrades in the amount of $110,000 in PY24 funds for a total of $217,756.47 through the utilization of prior year funds as follows:
2019 $5,596.38
2020 $8,784.90
2021 $59,723.44
2022 $32,467.73
2023 $1,184.02
2024 $110,000.00
Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)
1. Introduction
As a requirement of the U.S. Department of Housing and Urban Development, this document represents the Program Year 2024 Annual Action Plan. The City of Palm Desert (City) has been allocated funds from the Community Development Block Grant (CDBG) .
2. Summarize the objectives and outcomes identified in the Plan This could be a restatement of items or a table listed elsewhere in the plan or a reference to another location. It may also contain any essential items from the housing and homeless needs assessment, the housing market analysis or the strategic plan.
The Annual Action Plan is intended to fund high-priority community needs identified during the annual Citizen Participation Plan process while concurrently aligning with the goals of the previously approved Program Year 2024-2028 Consolidated Plan.
3. Evaluation of past performance
This is an evaluation of past performance that helped lead the grantee to choose its goals or projects.
A performance evaluation is annually assessed through HUD’s review of the Consolidated Annual Performance and Evaluation Report (CAPER). This document states the objectives and outcomes 473
Annual Action Plan
2024
2 OMB Control No: 2506-0117 (exp. 09/30/2021)
identified in each Annual Action Plan and includes an evaluation of past performance through measurable goals and objectives relative to actual performance. Prior documents can be found at the Palm Desert City Hall.
4. Summary of Citizen Participation Process and consultation process Summary from citizen participation section of plan.
The City held a public comment period from May 31, 2024 - July 1, 2024. On June 27, 2024, the City Council held a public hearing to provide residents an additional opportunity to review and comment on programming of CDBG funds.
As part of SA1, the City utilized it’s Citizen Participation Plan and held a 30-day Public Comment Period and notified the Public 10 days prior to the Public Hearing for consideration of approval of the SA1.
5. Summary of public comments
This could be a brief narrative summary or reference an attached document from the Citizen Participation section of the Con Plan.
No public comments received.
6. Summary of comments or views not accepted and the reasons for not accepting them No public comments received.
7. Summary
474
Annual Action Plan
2024
3 OMB Control No: 2506-0117 (exp. 09/30/2021)
PR-05 Lead & Responsible Agencies – 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
Lead Agency PALM DESERT
CDBG Administrator City Manager's Office / City of Palm Desert HOPWA Administrator
HOME Administrator
HOPWA-C Administrator
Table 1 – Responsible Agencies
Narrative (optional)
Consolidated Plan Public Contact Information
475
Annual Action Plan
2024
4 OMB Control No: 2506-0117 (exp. 09/30/2021)
Joe Barron
Senior Contracts and Grants Analyst City of Palm Desert 73510 Fred Waring Drive, Palm Desert, CA 92260 [email protected] | 760.776.6491 | www.palmdesert.gov 476
Annual Action Plan
2024
5 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-10 Consultation – 91.100, 91.200(b), 91.215(l)
1. Introduction
The City followed its HUD-approved Citizen Participation Plan to consult with the public, nonprofit organizations, governmental agencies, and other stakeholders to prepare the Annual Action Plan as required by 24 CRF 91.100.
Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
The City conducted outreach and issued public notices regarding the application process for PY24 subrecipient awards.
The City's Outside Agency Funding Committee recommended CDBG budget recommendations, which are incorporated into the Annual Action Plan. The City held a 30-day public comment period from May 31 - June 27, 2024.
On June 27, 2024, the City Council held a public hearing to provide residents an additional opportunity review and comment regarding CDBG funding recommendations. The City Council approved the submission of the Annual Action Plan.
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The City is actively involved in multiple activities to address the needs of homeless persons, which include coordination with the Continuum of Care. For example, the City is involved in regional coordination efforts between stakeholders throughout the Coachella Valley and Riverside County.
The City has historically funded homelessness services coordinated regionally through the Coachella Valley Association of Governments (CVAG). Since 2017 CVAG has allocated its regional financial commitments for other homelessness services. Last year the City made a financial commitment in the amount of $100,000 to CVAG to continue to implement homelessness services. A summary of accomplishments can be found at City Hall.
The City operates a homelessness assistance program as well. The program that has a primary focus on homelessness locally. The program contracts with the Riverside University Health System to provide a Behavioral Health Specialists in Palm Desert to focus on providing homelessness services. Please note the County of Riverside coordinates the Continuum of Care as well. 477
Annual Action Plan
2024
6 OMB Control No: 2506-0117 (exp. 09/30/2021)
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS The City does not receive Emergency Solutions Grant (ESG) funds.
2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
478
Annual Action Plan
2024
7 OMB Control No: 2506-0117 (exp. 09/30/2021)
Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization Fair Housing Council of Riverside County, Inc., Agency/Group/Organization Type Service-Fair Housing
What section of the Plan was addressed by Consultation? Housing Need Assessment Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide
public services (fair housing).
2 Agency/Group/Organization Cove Communities Senior Association dba The Joslyn Center
Agency/Group/Organization Type Services-Elderly Persons What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide
public services (elderly persons).
3 Agency/Group/Organization Desert Recreation District
Agency/Group/Organization Type Services-Children
What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide
public services (youth persons).
4 Agency/Group/Organization OPERATION SAFE HOUSE, INC.
Agency/Group/Organization Type Services-Children
Services-homeless
479
Annual Action Plan
2024
8 OMB Control No: 2506-0117 (exp. 09/30/2021)
What section of the Plan was addressed by Consultation? Homelessness Needs - Unaccompanied youth Homelessness Strategy
Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide
public services (youth homeless persons).
5 Agency/Group/Organization Neighborhood Partnership Housing Services Agency/Group/Organization Type Housing
What section of the Plan was addressed by Consultation? Anti-poverty Strategy Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide
housing rehab.
6 Agency/Group/Organization DESERT ARC
Agency/Group/Organization Type Services-Persons with Disabilities What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to construct
public facilities and improvements (serving people with disabilities).
7 Agency/Group/Organization RANCH RECOVERY CENTER
Agency/Group/Organization Type Services-Persons with Disabilities Services-Health
What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Anti-poverty Strategy
480
Annual Action Plan
2024
9 OMB Control No: 2506-0117 (exp. 09/30/2021)
Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to construct
public facilities and improvements (serving people with addictions).
8 Agency/Group/Organization WeeCare
Agency/Group/Organization Type Services-Children
What section of the Plan was addressed by Consultation? Non-Homeless Special Needs Briefly describe how the Agency/Group/Organization was consulted. What are the anticipated outcomes of the consultation or areas for improved coordination?
The subrecipient applied for CDBG funds to provide
public services (youth persons).
Identify any Agency Types not consulted and provide rationale for not consulting The City attempts to keep a comprehensive list of stakeholders potentially eligible to receive CDBG funds for activities consistent with the Consolidated Plan goals. As some stakeholders undergo staffing changes, on occasion City staff is unaware of such changes throughout the program year. As a result, some stakeholders may not realize the City is attempting to consult with their organizations during the Annual Action Plan process. To mitigate this concern, City staff updates its contact list annually to ensure proper channels of communication with stakeholders Other local/regional/state/federal planning efforts considered when preparing the Plan Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan?
Continuum of Care Housing Services Authority Both address issues pertaining to homelessness and special needs housing.
Housing Element City of Palm Desert Both include the goal of fostering affordable housing.
Table 3 – Other local / regional / federal planning efforts 481
Annual Action Plan
2024
10 OMB Control No: 2506-0117 (exp. 09/30/2021)
Narrative (optional)
The City encouraged cooperation and coordination through the Citizen's Participation Plan process. The City followed the process as outlined in the Executive Summary Citizen's Participation Plan Section. In addition, the City is a member of the Coachella Valley Association of Governments (CVAG) Homeless Committee that consists of Mayors or Councilmember's of each of the nine (9) Coachella Valley communities as well as the County of Riverside, and a representative from Supervisor V. Manuel Perez's office, and Ex-officials who are represent atives from organizations that serve homeless and similar client base. In addition, three of the Ex -officials are also representatives of the CoC's Eastern Region Committee that reports to the CoC BOG. Through this committee and the CoC, the City is able to work with other local government agencies and service providers to address issues on a local and regional (Coachella Valley) basis and obtain input and insight into community needs that are included within the Consolidated Plan.
482
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 11 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-12 Participation – 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal-setting The City conducted outreach and issued public notices regarding the application process for subrecipient awards.
The City's Outside Agency Funding Committee recommended CDBG budget recommendations, which are incorporated into the Annual Action Plan. The City held a 30-day public comment period from May 31 - July 1, 2024.
On June 27, 2024, the City Council held a public hearing to provide residents an additional opportunity review and comment regarding CDBG funding recommendations. The City Council approved the submission of the Annual Action Plan.
Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
URL (If
applicable)
1 Newspaper Ad
Minorities
Non-English
Speaking - Specify
other language:
Spanish
No response received
No comments
received
NA
Table 4 – Citizen Participation Outreach
483
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 12 OMB Control No: 2506-0117 (exp. 09/30/2021)
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
Anticipated Resources
Program Source of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative
Annual Description
Allocation:
$
Program
Income: $
Prior Year
Resources:
$
Total:
$
CDBG public -
federal
Acquisition
Admin and Planning
Economic Development
Housing
Public Improvements
Public Services 365,446 0 0 365,446 0
484
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 13 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Source of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative
Annual Description
Allocation:
$
Program
Income: $
Prior Year
Resources:
$
Total:
$
HOME public -
federal
Acquisition
Homebuyer assistance
Homeowner rehab
Multifamily rental new
construction
Multifamily rental rehab
New construction for
ownership
TBRA 0 0 0 0 0
Table 5 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
The above sources of funding have been identified as available funds to be leveraged with, where and when possible, nonprofit organizations and other entities awarded CDBG funds to provide assistance to meet the goals and objectives as outlined within the City's Five-Year Consolidated Plan and One-Year Annual Action Plan. Funded organizations will also utilize awarded funds to leverage, where and when possible, dollars available through the organization as well as other grant awards and/or donations to undertake programs/projects that may not otherwise be possible. Organizations have more flexibility to utilize funding more efficiently and effectively to provide needed support services to clients.
485
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 14 OMB Control No: 2506-0117 (exp. 09/30/2021)
If appropriate, describe publicly owned land or property located within the jurisdiction that may be used to address the needs identified in the plan NA in Palm Desert
Discussion
The City will continue to allocate CDBG funding and other sources of funding when and where available to meet the needs of qualifying individuals as designated by HUD. Programs and projects will be targeted that address goals and objectives identified within the Annual Action Plan and Consolidated Plan. In addition, the funds will be targeted so as to provide the maximize benefit to those in need. 486
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 15 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
1 Support Public and
Community Facilities
Improvement
2023 2028 Non-Housing
Community
Development
Citywide Affordable Senior
Housing (Increase)
Increase Senior
Services and
Programming
Senior
Transportation
(Enhance Options)
Increase Affordable
Housing
Reduce vacancies
in the City
Rental Assistance
CDBG:
$240,200
Public Facility or Infrastructure
Activities other than
Low/Moderate Income Housing
Benefit: 1000 Persons Assisted
2 Support Fair Housing
Initiatives
2023 2028 Citywide Affordable Senior
Housing (Increase)
Increase Affordable
Housing
Reduce vacancies
in the City
CDBG:
$31,816
Public service activities other
than Low/Moderate Income
Housing Benefit: 500 Persons
Assisted
487
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 16 OMB Control No: 2506-0117 (exp. 09/30/2021)
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
3 Fund Vital
Community and
Homeless Services
2023 2028 Homeless Citywide Increase Affordable
Housing
CDBG:
$23,000
Public service activities other
than Low/Moderate Income
Housing Benefit: 250 Persons
Assisted
Table 6 – Goals Summary
Goal Descriptions
1 Goal Name Support Public and Community Facilities Improvement Goal Description
2 Goal Name Support Fair Housing Initiatives
Goal Description
3 Goal Name Fund Vital Community and Homeless Services
Goal Description
488
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 17 OMB Control No: 2506-0117 (exp. 09/30/2021)
Projects
AP-35 Projects – 91.220(d)
Introduction
The Annual Action Plan identifies funding the following activities:
Public Services 15%
Public Facilities and Improvements 65%
Program Administration 20%
Projects
# Project Name
1 Public Services
2 Administration
3 Public Facilities and Improvements- The Joslyn Center 4 Public Facilities and Improvements- Desert Arc*
5 Public Facilities & Improvements- The Ranch Recovery Centers, Inc 6 Public Facilities & Improvements- Palm Desert Housing Authority Table 7 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The City identifies its highest priority needs during its citizen participation process every year and the Consolidated Plan process every five years. Activities are funded annually taking into consideration these highest priority needs. The primary obstacle to address underserved needs in the community is the lack of resources to provide a greater level of assistance. *Project 4 moved to PY20-CV funds as part of PY24 AAP SA1 489
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 18 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
490
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 19 OMB Control No: 2506-0117 (exp. 09/30/2021)
1 Project Name Public Services
Target Area Citywide
Goals Supported Support Fair Housing Initiatives
Fund Vital Community and Homeless Services
Needs Addressed Increase Affordable Housing
Reduce vacancies in the City
Rental Assistance
Funding CDBG: $54,816
Description Youth Service Programs and Fair Housing Programs designed to meet the needs of local residents.
Target Date 9/30/2025
Estimate the number
and type of families
that will benefit from
the proposed activities
100 youth will receive services and 500 households will receive fair housing support
Location Description Fair Housing Council of Riverside County: 3933 Mission Inn Avenue, Ste. 100, Riverside, CA 92501
Operation SafeHouse: 9685 Hayes Street, Riverside, CA 92503 Planned Activities Fair Housing Council of Riverside County: Mandated fair housing services
Operation SafeHouse: Case management services for homeless youth at a transitional living facility
Desert Recreation District: Scholarships for families and individuals in the community who may otherwise be unable to participate in recreational activities
2 Project Name Administration
Target Area Citywide
Goals Supported Support Public and Community Facilities Improvement Support Fair Housing Initiatives
Fund Vital Community and Homeless Services
491
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 20 OMB Control No: 2506-0117 (exp. 09/30/2021)
Needs Addressed Affordable Senior Housing (Increase)
Increase Senior Services and Programming
Senior Transportation (Enhance Options)
Increase Affordable Housing
Reduce vacancies in the City
Rental Assistance
Funding CDBG: $70,430
Description CDBG Administration. Eligible Activity (Matrix Code): 21A. CDBG National Objective: Planning and Administration: CDBG Citation:
570.206(a)
Target Date 9/30/2025
Estimate the number
and type of families
that will benefit from
the proposed activities
Admin supports those entities supporting families.
Location Description
Program Administration: 73510 Fred Waring Drive, Palm Desert, CA 92260
Planned Activities Reporting, oversight, monitoring of subrecipients. 3 Project Name Public Facilities and Improvements- The Joslyn Center Target Area Citywide
Goals Supported Support Public and Community Facilities Improvement Needs Addressed Senior Transportation (Enhance Options) Funding CDBG: $75,000
Description ADA Restroom improvements- Continuation in 2024 with additional funding.
Target Date 9/30/2025
Estimate the number
and type of families
that will benefit from
the proposed activities
500 seniors will benefit from facility improvements.
Location Description The Joslyn Center: 73-750 Catalina Way, Palm Desert, CA 92260 492
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 21 OMB Control No: 2506-0117 (exp. 09/30/2021)
Planned Activities This multi-phase project will entail a full remodel of each of the five restrooms on The Joslyn Center campus in order to make them fully compliant with ADA requirements and become fully handicap accessible as set forth in the report and survey of Disability Access Consultants conducted on May 21, 2018. This project will benefit all 2000+ members as well as other members of the public and guests that utilize The Joslyn Center. It is estimated that at least 500 individuals consisting of members, public and guests will directly benefit from the ADA upgrades. This request represents the second phase of this project which is the remodel of men's and women's restrooms in building two which consists of meeting rooms and the Arthur Newman Theater.
Because of rising
construction costs, it would be possible to break the remodel of the building’s two restrooms into separate projects consisting of the individual men's and women's restrooms. This option was available in the restroom remodel recently completed in building one. This choice is available by requesting responsive bidders to submit bids for both restrooms and for just one restroom. This would delay the ultimate completion of the project, but allow some flexibility because of rising construction costs. Remodeling the restrooms to ADA compliance is a priority for The Joslyn Center because many of our members experience physical disability which requires a fully accessible restroom. 4 Project Name Public Facilities and Improvements- Desert Arc Target Area Citywide
Goals Supported Support Public and Community Facilities Improvement Needs Addressed Reduce vacancies in the City
Funding CDBG: $110,000
Description HVAC Upgrades
Target Date 9/30/2025
Estimate the number
and type of families
that will benefit from
the proposed activities
500 LMI households will benefit from infrastructure improvements Location Description Desert ARC: 73-255 Country Club Dr, Palm Desert, CA 92260 493
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 22 OMB Control No: 2506-0117 (exp. 09/30/2021)
Planned Activities Desert Arc's HVAC (Heating, Ventilation, and Air Conditioning) Replacement Project will encompass the removal and replacement of nine (9) obsolete, rooftop HVAC units on Building 3 of its Palm Desert campus (73275 Country Club Drive). The total amount needed for the HVAC Replacement Project is $509,587.00 with roughly half of the total amount being allocated toward equipment costs at $271,187.00. The current HVAC units are 17 years-old, with an average lifespan of 15 years, and use an R-22 refrigerant coolant which will no longer be available/produced due to new EPA (Environmental Protection Agency) regulations. The old units will be replaced with new 410-A refrigerant rooftop HVAC units which can be retrofitted into the existing system's footprint. The replacement of these units is urgent for two reasons.
Firstly, the 410-A HVAC units will not be available after December 31, 2024 and the 2025 units will require additional construction and fortification to the roof of Building 3 in order to compensate for the additional weight of the 2025 units. Retrofitting the 410- A HVAC units will save crucial time and funds. Secondly, California Department of Social Services Title 22 (Division 6, Chapter 3, Section 82088) mandates that Desert Arc maintain a comfortable temperature for
clients at all times with a maximum indoor temperature of 85 degrees F or 30 degrees F less than outside temperatures in areas of extreme heat. Due to the excessive summer temperatures in Palm Desert, which can reach up to 120 degrees F, it is imperative for Desert Arc to maintain a climate controlled facility to ensure the health and wellbeing of its clients (people with intellectual and developmental disabilities) and staff while also staying in line with state regulations. 5 Project Name Public Facilities & Improvements- The Ranch Recovery Centers, Inc Target Area Citywide
Goals Supported Support Public and Community Facilities Improvement Needs Addressed Reduce vacancies in the City
Funding CDBG: $55,200
Description HVAC units, appliances, dorm room improvements Target Date 9/30/2025
Estimate the number
and type of families
that will benefit from
the proposed activities
10 ELI Individuals with Chronic Substance Abuse Disorder 494
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 23 OMB Control No: 2506-0117 (exp. 09/30/2021)
Location Description
Planned Activities Funds are allocated to complete several capital improvement projects at 2 facilities. Time and continuous use take a physical toll on our facilities and, while we take care to maintain and repair everything we can, there comes a point where replacement is necessary. The items requested will help improve the treatment environment for the patients in our
care, improving their safety and well-being. Additionally, a well-kept facility is beneficial for mental and emotional health. Many of our contracts only allow us to utilize contract dollars for direct treatment costs and many of our capital improvement purchases and upgrades are funded through charitable contributions. Projects include: HVAC units, appliances, dorm room improvements
6 Project Name Public Facilities- PD Housing Authority
Target Area Citywide
Goals Supported Enhance public facilities
Needs Addressed Low-to-Moderate Income Housing
Public Facilities
Funding CDBG: $217,756.47
Description Public Facilities Improvements- Parking Lot Upgrades at Public Housing Facility
Target Date 5/1/2025
Estimate the number
and type of families
that will benefit from
the proposed activities
250 Public Housing Authority residents
Location Description
Planned Activities Parking Lot Improvements
495
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 24 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City of Palm Desert is located in Riverside County; particularly, the Coachella Valley. Historically, the City has not had any low- and moderate-income census tracts; however, the City now has two eligible census tracts as of recently (ACS data). CDBG funds will be used for low- and moderate-income clientele (or presumed benefit).
Geographic Distribution
Target Area Percentage of Funds
Citywide 100
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically The City has not historically funded CDBG activities based upon geographic areas since there have not been eligible low and moderate-income census tracts; however, HUD recently revised the census criteria used to determine eligibility. As a result, the City now has two CDBG-eligible census tracts. City staff is currently exploring the possibility of a Section 108 Loan for City Council’s consideration in subsequent program years.
Discussion
496
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 25 OMB Control No: 2506-0117 (exp. 09/30/2021)
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
One Year Goals for the Number of Households to be Supported Homeless 0
Non-Homeless 0
Special-Needs 0
Total 0
Table 9 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 0
The Production of New Units 0
Rehab of Existing Units 0
Acquisition of Existing Units 0
Total 0
Table 10 - One Year Goals for Affordable Housing by Support Type Discussion
497
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 26 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-60 Public Housing – 91.220(h)
Introduction
The City will not undertake activities that address public housing in the program year.
Actions planned during the next year to address the needs to public housing Not Applicable. The City does not own nor operate public housing.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
Not Applicable. The City does not own nor operate public housing If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not Applicable. The City does not own nor operate public housing Discussion
Not Applicable. The City does not own nor operate public housing 498
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 27 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
The City will continue to work with nonprofit organizations, government agencies, and other stakeholders to fund activities that help prevent and reduce homelessness.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The County of Riverside CoC has established chronically homeless persons as the highest need priority based on the goals HUD has established in its Opening Doors Federal and Strategic Plan to Prevent and End Homelessness. The CoC has implemented a Coordinated Entry System (CES) to ensure appropriate intervention is utilized to serve those who are homeless and providing for a prioritization of vulnerability and linkage to community resources and housing based on the vulnerability prioritization. Within the CoC, there are several outreach teams from County, cities, and nonprofit homeless providers that cover specific populations or geographic regions in the County. There is also specific outreach teams serving the mentally ill, veterans, youth and chronic homeless. The Behavioral Health Systems Department has outreach peer specialists that perform initial field assessments, in depth assessments, referrals to all contacts, linkage to various community organizations.
Addressing the emergency shelter and transitional housing needs of homeless persons The Housing First approach adopted by the County and CoC requires that homeless are helped into permanent housing or rapid re-housing as soon as possible. Transitional housing beds have begun to decrease countywide and permanent housing is increasing because of reallocations made in the HUD CoC Program Consolidated Application and the CoC’s success in obtaining new funding for permanent supportive housing. Both transitional housing and emergency shelters focus on lessening the time that a homeless person or family’s length of time homeless (LOTH) in the shelter by effective and quick assessment of homeless clients and getting them stabilized into permanent housing with intensive case management initially and support in the initial phase of residency in permanent housing. This period will serve as a time to address the other needs to maintain self-sufficiency either by accessing mainstream benefits, employment or medical or mental health support.
The CoC collaborates with the City and other stakeholders to integrate CoC programs, Emergency Solutions Grant (ESG), Social Services to Veteran Families (SSVF), and CDBG funding to increase the number of persons with rapid re-housing assistance. Also, other non-McKinney-Vento funding sources, such as Emergency Food and Shelter Program (EFSP), funded under Federal Emergency Management Agency (FEMA) will be matched as a source for rental / mortgage assistance for families that are 499
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 28 OMB Control No: 2506-0117 (exp. 09/30/2021)
homeless or at-risk of homelessness in the County’s strategy to meet this goal.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again
The CoC implemented a Coordinated Entry System (CES) to assess homeless persons using the VI-SPDAT that tracks the length of time a client has been on the streets or in an emergency shelter. DPSS uses HUD’s CoC Program planning grant funding to measure system-wide performance in HMIS, such as length of time homeless. This is used to help the CoC prioritize and house those with longest length of time homeless. The planning process also included working with the CoC Standards and Evaluation Committee to continue developing strategies to prioritize persons with longest time homeless and most severe needs, including:
The CoC has also adopted a Housing First approach that is evidenced-based and endorsed by HUD to place a homeless person in permanent housing and provide supportive services intended to keep them stably housed.
Homeless CoC youth providers have implemented outreach and service-based events in the communities to draw homeless youth, unaccompanied and transitional age into contact with services available to them. The Operation SafeHouse is the only CoC youth provider that has opened a permanent supportive housing program called the Harrison House, which is for transitional age youth, in the eastern desert region of Riverside County.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The CoC Discharge Policy is mandated by the State and followed by the CoC. The CoC established a Discharge Planning Committee, responsible for implementing policies and protocols and coordinating with various organizations, to ensure that persons being discharged from a publicly funded institution or system of care are not discharged immediately into homelessness. The goals are to identify discharge housing needs inclusive of housing and supportive services and to link the individual with community resources that will include mental health services, substance abuse support, and housing. The Hospital Association of Southern California Inland Area serves as the lead agency on the Discharge Planning 500
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 29 OMB Control No: 2506-0117 (exp. 09/30/2021)
Committee to facilitate communication regarding the discharge planning needs of homeless persons from acute care hospitals. The Riverside County University Health System – Behavioral Health, collaborates with DPSS and the CoC in the coordination and implementation of discharge planning for homeless individuals disabled by a serious mental health and/or substance abuse disorder(s). Foster Care and extended foster care programs help transition dependent youth who are emancipating from foster care to independent living. The Department of Public Social Services, Riverside Sheriff’s, and Probation Department support the Continuum of Care’s mission of working towards reintegrating persons leaving correctional facilities to community-based living and self-sufficiency.
Discussion
501
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 30 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing – 91.220(j)
Introduction:
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
The City does not plan to undertake any activities this program year using CDBG funds to remove barriers to affordable housing.
Discussion:
502
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 31 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions – 91.220(k)
Introduction:
The City will continue to work with various stakeholders to meet the needs of its residents that remain in-need of CDBG-eligible activities consistent with Consolidated Plan goals.
Actions planned to address obstacles to meeting underserved needs The City will continue to work toward the reduction/elimination of obstacles to meet underserved needs through the funding of various organizations that are established to provide direct services to those in need. The City is not equipped to provide direct services; therefore, funding organizations that do is essential to our success in addressing the identified goals and objectives. The City will continue to partner with service providers to address obstacles and address barriers that exist. In addition, the City works with the County of Riverside, the CoC, local agencies, nonprofits, etc. to address various aspects related to CoC programs and activities, as well as obstacles that face the underserved in general.
However, the CoC addresses issues relative to homelessness, mental and physical illnesses, domestic violence, etc. and has a wide range of members where collaboration in other areas is an option. Through these working relationships, obstacles such as lack of communication between agencies, improved services, limited resources, tracking and monitoring, and other needed resources are obtained, gaps in services are better identified, and there is a more cohesive approach to identifying and resolving issues.
Actions planned to foster and maintain affordable housing The City and the Palm Desert Housing Authority will continue to maintain the existing affordable housing stock through the funding sources identified previously; however, as noted with the elimination of redevelopment agencies, there is no longer what is considered “20% Set Aside Funds”. Therefore, maintaining existing properties and programs will be the primary focus, provided funding is available, for some time to come. However, new projects and programs will be planned and implemented where and when possible.
Actions planned to reduce lead-based paint hazards
The City’s Building & Safety and Housing departments distribute informational pamphlets on Lead Based Paint Hazards and refer all calls to the County of Riverside Environmental Health Department. The City addresses this issue on a case-by-case basis through multiple steps.
Actions planned to reduce the number of poverty-level families The City is continuing to team up with service providers to provide assistance for poverty level families, including funding food and services options during the Program Year. In addition, the City will seek out additional partnerships for programs that encourage self-sufficiency including employment and training, 503
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 32 OMB Control No: 2506-0117 (exp. 09/30/2021)
housing options, and safety net programs.
Actions planned to develop institutional structure
The City will continue to work with outside agencies to maintain and develop relationships, including with nonprofit organizations, private businesses, the CoC, and nonprofit organizations in the region.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to work with various County departments, agencies, and nonprofit organizations to identify and carry out goals and objectives of the CDBG Program, and to create a more cooperative working relationship with all interested parties. The City invites these groups to attend public hearings, community meetings, and special meetings that address specific programs and projects. The City has an approved Citizen’s Participation Plan that it follows in this regard. In addition, City staff regularly attends CoC meetings that involve multiple organizations and various County Departments as well as other local jurisdictions wherein discussions are held on homelessness as well as supportive services to other at-risk groups of individuals and families.
Discussion:
504
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 33 OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0
2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 0
5. The amount of income from float-funded activities 0
Total Program Income: 0
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income.Overall Benefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 0.00% HOME Investment Partnership Program (HOME)
Reference 24 CFR 91.220(l)(2)
1. A description of other forms of investment being used beyond those identified in Section 92.205 is as follows:
NA
2. A description of the guidelines that will be used for resale or recapture of HOME funds when used 505
City of Plam Desert PY 24 CDBG Annual Action Plan- Approved 34 OMB Control No: 2506-0117 (exp. 09/30/2021)
for homebuyer activities as required in 92.254, is as follows:
NA
3. A description of the guidelines for resale or recapture that ensures the affordability of units acquired with HOME funds? See 24 CFR 92.254(a)(4) are as follows:
NA
4. Plans for using HOME funds to refinance existing debt secured by multifamily housing that is rehabilitated with HOME funds along with a description of the refinancing guidelines required that will be used under 24 CFR 92.206(b), are as follows:
NA
5. If applicable to a planned HOME TBRA activity, a description of the preference for persons with special needs or disabilities. (See 24 CFR 92.209(c)(2)(i) and CFR 91.220(l)(2)(vii)).
NA
6. If applicable to a planned HOME TBRA activity, a description of how the preference for a specific category of individuals with disabilities (e.g. persons with HIV/AIDS or chronic mental illness) will narrow the gap in benefits and the preference is needed to narrow the gap in benefits and services received by such persons. (See 24 CFR 92.209(c)(2)(ii) and 91.220(l)(2)(vii)).
7. If applicable, a description of any preference or limitation for rental housing projects. (See 24 CFR
92.253(d)(3) and CFR 91.220(l)(2)(vii)). Note: Preferences cannot be administered in a manner that limits the opportunities of persons on any basis prohibited by the laws listed under 24 CFR 5.105(a).
NA
506
Community Development Block
Grant Substantial Amendments
Program Years 2020-2024
Ivan Tenorio, Homeless and Supportive Services Manager
507
Introduction:
Why
Substantial
Amendments
are needed
HUD Requirement: A Substantial Amendment is required when there is a significant change to an approved Consolidated or Annual Action Plan. This includes:
• Reallocating $25,000 or more between projects,
• Adding or cancelling a project, or
• Significant changes in the purpose, scope, location, or beneficiaries of a project.
508
CDBG
Reallocation
Plan (PY
2019–2024)
Unspent Funds Accumulated: $449,198.11 (from cost savings on completed projects)
Unspent Funds by Year:
• 2019: $5,596.38
• 2020: $8,784.90
• 2020 (CV): $181,441.64
• 2021: $59,723.44
• 2022: $32,467.73
• 2023: $51,184.02
• 2024: $110,000.00
• Total: $449,198.11
Reallocation Plan:
• CDBG CV – Desert Arc $180,000
• CDBG – Joslyn Center (ADA) $50,000
• CDBG - PDHA Infrastructure $217,756.47
• Total Reallocated: $447,756.47
509
Outcome if
approved
With Council’s approval, staff will successfully draw
down the majority of remaining CDBG and CDBG-CV
balances from Program Years 2019-2024, maximizing
community impact and ensuring effective use of federal
funds.
510
Questions
511
512