University Underpass Refurbishment Project
BID SUMMARY
UNIT COST TOTAL UNIT COST TOTAL
001
Base bid for the completion of all electrical fixture work as described in the project drawing’s and specs including, but not limited to, demolition, removal, reinstallation and testing of the system.
1L S $98,657.00 $98,657.00 $99,300.00 $99,300.00
002
Base bid for the complete repainting of the interior of the University Tunnel system as described in the project
drawings and specs including, but not limited to, surface preparation, priming, painting, and cleaning.
1L S $201,343.00 $201,343.00 $184,470.00 $184,470.00
$300,000.00 $283,770.00TOTAL
5.4%
UNDER
ENGINEERS ESTIMATE ESTATE DESIGN AND CONSTRUCTIONBID ITEM DESCRIPTION UNIT QUANTITY