BID SUMMARY COMPARISON
NEWELL ROAD BRIDGE REPLACEMENT - BRLS 5100 (017)
IFB 194068
PROJECT NO. PE-12011
ITEM L ITEM ITEM TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL
NO. M CODE DESCRIPTION PRICE PRICE PRICE PRICE PRICE PRICE 1 1 LS 051240A CONSTRUCTION SURVEYS $79,501.50 $79,501.50 $25,950.00 $25,950.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $50,000.00 $50,000.00 $85,000.00 $85,000.00 2 1 LS 070030 LEAD COMPLIANCE PLAN $7,371.00 $7,371.00 $2,100.00 $2,100.00 $2,235.00 $2,235.00 $2,100.00 $2,100.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 3 1 LS 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE $4,212.00 $4,212.00 $0.00 $0.00 $10,950.00 $10,950.00 $3,500.00 $3,500.00 $5,000.00 $5,000.00 $60,000.00 $60,000.00 4 1 LS 120090 CONSTRUCTION AREA SIGNS $42,120.00 $42,120.00 $21,500.00 $21,500.00 $21,500.00 $21,500.00 $21,500.00 $21,500.00 $20,000.00 $20,000.00 $28,000.00 $28,000.00 5 1 LS 120100 TRAFFIC CONTROL SYSTEM $421,200.00 $421,200.00 $100,000.00 $100,000.00 $540,000.00 $540,000.00 $43,300.00 $43,300.00 $325,000.00 $325,000.00 $200,000.00 $200,000 .00 6 1 LS 120402A TRAFFIC MANAGEMENT PLAN $11,056.50 $11,056.50 $2,500.00 $2,500.00 $3,000.00 $3,000.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 7 3 EA 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) $56,862.00 $170,586.00 $15,000.00 $45,000.00 $16,200.00 $48,600.00 $29,000.00 $87,000.00 $25,000.00 $75,000.00 $25,000.00 $75,000.00 8 1 LS 130100 JOB SITE MANAGEMENT $47,490.30 $47,490.30 $30,000.00 $30,000.00 $100,000.00 $100,000.00 $88,000.00 $88,000.00 $300,000.00 $300,000.00 $475,000.00 $475,000.00 9 1 LS 130301 STORM WATER POLLUTION PREVENTION PLAN $113,724.00 $113,724.00 $3,300.00 $3,300.00 $2,740.00 $2,740.00 $595.00 $595.00 $50,000.00 $50,000.00 $5,000.00 $5,000.00 10 28 EA 130310 RAIN EVENT ACTION PLAN $526.50 $14,742.00 $425.00 $11,900.00 $120.00 $3,360.00 $500.00 $14,000.00 $100.00 $2,800.00 $325.00 $9,100.00 11 20 EA 130320 STORM WATER SAMPLING AND ANALYSIS DAY $1,158.30 $23,166.00 $425.00 $8,500.00 $120.00 $2,400.00 $500.00 $10,000.00 $425.00 $8,500.00 $500.00 $10,000.00 12 2 EA 130330 STORM WATER ANNUAL REPORT $3,159.00 $6,318.00 $750.00 $1,500.00 $1,200.00 $2,400.00 $2,500.00 $5,000.00 $2,000.00 $4,000.00 $825.00 $1,650.00 13 40 EA 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY $1,158.30 $46,332.00 $1,200.00 $48,000.00 $60.00 $2,400.00 $500.00 $20,000.00 $1,200.00 $48,000.00 $487.00 $19,480.00 14 1 LS 131201 TEMPORARY CREEK DIVERSION SYSTEMS $52,650.00 $52,650.00 $100,000.00 $100,000.00 $70,000.00 $70,000.00 $222,000.00 $222,000.00 $125,000.00 $125,000.00 $350,000.00 $350,000.0 0 15 150 LF 140607A TEMPORARY WILDLIFE EXCLUSION FENCE $36.86 $5,528.25 $25.00 $3,750.00 $20.65 $3,097.50 $30.00 $4,500.00 $20.00 $3,000.00 $12.00 $1,800.00 16 1 LS 146007 INVASIVE SPECIES CONTROL $5,265.00 $5,265.00 $5,000.00 $5,000.00 $30,000.00 $30,000.00 $11,200.00 $11,200.00 $5,000.00 $5,000.00 $12,000.00 $12,000.00 17 1 LS 148006A VIBRATION MONITORING AND CONTROL $105,300.00 $105,300.00 $128,000.00 $128,000.00 $50,000.00 $50,000.00 $25,800.00 $25,800.00 $25,000.00 $25,000.00 $101,000.00 $101,000.00 18 820 LF 141103
REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE
(HAZARDOUS WASTE) $13.16 $10,793.25 $16.00 $13,120.00 $27.95 $22,919.00 $16.00 $13,120.00 $20.00 $16,400.00 $29.00 $23,780.00 19 1 LS 141110 WORK AREA MONITORING (BRIDGE) $45,279.00 $45,279.00 $15,000.00 $15,000.00 $70,000.00 $70,000.00 $16,100.00 $16,100.00 $15,000.00 $15,000.00 $49,800.00 $49,800.00 20 1 LS 150103A SALVAGE WATER QUALITY SAMPLING STATION $1,053.00 $1,053.00 $1,500.00 $1,500.00 $8,224.39 $8,224.39 $2,000.00 $2,000.00 $10,000.00 $10,000.00 $3,000.00 $3,000.00 21 20 EA 150104A UTILITY POTHOLING $3,685.50 $73,710.00 $1,000.00 $20,000.00 $1,430.03 $28,600.60 $3,000.00 $60,000.00 $2,000.00 $40,000.00 $850.00 $17,000.00 22 400 LF 160110 TEMPORARY HIGH-VISIBILITY FENCE $12.11 $4,843.80 $25.00 $10,000.00 $26.94 $10,776.00 $10.00 $4,000.00 $5.00 $2,000.00 $9.00 $3,600.00 23 1,300 LF 160110A TEMPORARY VISUAL BARRIER $42.12 $54,756.00 $15.00 $19,500.00 $34.23 $44,499.00 $22.00 $28,600.00 $15.00 $19,500.00 $25.00 $32,500.00 24 23 EA 170101A REMOVE TREE $10,530.00 $242,190.00 $750.00 $17,250.00 $750.00 $17,250.00 $1,200.00 $27,600.00 $1,000.00 $23,000.00 $275.00 $6,325.00 25 16 EA 170102A TREE PRUNING, TRIMMING AND ROOT CUTTING $1,053.00 $16,848.00 $675.00 $10,800.00 $1,477.90 $23,646.40 $675.00 $10,800.00 $1,000.00 $16,000.00 $1,600.00 $25,600.00 26 1 LS 170103 CLEARING AND GRUBBING (LS) $63,180.00 $63,180.00 $75,000.00 $75,000.00 $57,739.93 $57,739.93 $34,850.00 $34,850.00 $250,000.00 $250,000.00 $40,000.00 $40,000.00 27 200 CY 190101 (F) - ROADWAY EXCAVATION $442.26 $88,452.00 $840.00 $168,000.00 $1,130.19 $226,038.00 $400.00 $80,000.00 $300.00 $60,000.00 $2,700.00 $540,000.00 28 F 210 CY 192003 (F) -STRUCTURE EXCAVATION (BRIDGE) $352.76 $74,078.55 $90.00 $18,900.00 $148.64 $31,214.40 $80.00 $16,800.00 $1,000.00 $210,000.00 $653.00 $137,130.00 29 F 743 CY 192037 (F) - STRUCTURE EXCAVATION (RETAINING WALL) $352.76 $262,096.97 $46.00 $34,178.00 $225.32 $167,412.76 $150.00 $111,450.00 $200.00 $148,600.00 $435.00 $323,205.00 30 F 60 CY 193003 (F) - STRUCTURE BACKFILL (BRIDGE) $352.76 $21,165.30 $400.00 $24,000.00 $725.60 $43,536.00 $400.00 $24,000.00 $100.00 $6,000.00 $550.00 $33,000.00 31 F 647 CY 193013 (F) - STRUCTURE BACKFILL (RETAINING WALL) $352.76 $228,232.49 $120.00 $77,640.00 $240.24 $155,435.28 $275.00 $177,925.00 $100.00 $64,700.00 $329.00 $212,863.00 32 1,418 CY 198010 IMPORTED BORROW (CY) $189.54 $268,767.72 $60.00 $85,080.00 $160.91 $228,170.38 $1.00 $1,418.00 $50.00 $70,900.00 $84.00 $119,112.00 33 9,385 SQFT 202007A SOIL PREPARATION AND FINE GRADING $1.05 $9,882.41 $0.90 $8,446.50 $0.50 $4,692.50 $0.50 $4,692.50 $0.50 $4,692.50 $2.00 $18,770.00 34 16 EA 204011 PLANT (GROUP K) (24" BOX) $895.05 $14,320.80 $750.00 $12,000.00 $500.00 $8,000.00 $550.00 $8,800.00 $550.00 $8,800.00 $962.00 $15,392.00 35 732 EA 204035 PLANT (GROUP A) (NO. 1) $31.59 $23,123.88 $28.00 $20,496.00 $20.00 $14,640.00 $30.00 $21,960.00 $30.00 $21,960.00 $36.00 $26,352.00 36 227 EA 204036 PLANT (GROUP B) (NO. 5) $52.65 $11,951.55 $60.00 $13,620.00 $60.00 $13,620.00 $65.00 $14,755.00 $65.00 $14,755.00 $77.00 $17,479.00 37 3 EA 204038 PLANT (GROUP U) (NO. 15) $684.45 $2,053.35 $250.00 $750.00 $300.00 $900.00 $300.00 $900.00 $300.00 $900.00 $320.00 $960.00 38 1,820 SQFT 204046A SOD $2.63 $4,791.15 $2.50 $4,550.00 $1.50 $2,730.00 $1.50 $2,730.00 $1.00 $1,820.00 $3.00 $5,460.00 39 1 LS 204099 PLANT ESTABLISHMENT WORK $9,687.60 $9,687.60 $8,100.00 $8,100.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $5,000.00 $5,000.00 $11,000.00 $11,000.00 40 1,150 SQFT 205033 GRAVEL MULCH $5.27 $6,054.75 $5.00 $5,750.00 $3.00 $3,450.00 $3.00 $3,450.00 $3.00 $3,450.00 $6.50 $7,475.00 41 11,205 SQFT 205036A MULCH $2.11 $23,597.73 $1.20 $13,446.00 $1.00 $11,205.00 $1.00 $11,205.00 $1.00 $11,205.00 $1.50 $16,807.50 42 90 LF 205062 ROOT BARRIER $15.80 $1,421.55 $16.00 $1,440.00 $11.00 $990.00 $11.00 $990.00 $11.00 $990.00 $20.00 $1,800.00 43 5,400 SQFT 206409A EXISTING IRRIGATION MODIFICATIONS $8.42 $45,489.60 $6.25 $33,750.00 $3.85 $20,790.00 $3.85 $20,790.00 $5.00 $27,000.00 $8.00 $43,200.00 44 2 EA 206500A
POINT OF CONNECTION TO TAP EXISTING WATER MAIN
AND INSTALL SERVICE LINE $7,897.50 $15,795.00 $4,000.00 $8,000.00 $5,000.00 $10,000.00 $14,188.00 $28,376.00 $8,000.00 $16,000.00 $24,900.00 $49,800.00 45 7 EA 206569A REMOTE CONTROL VALVE $1,053.00 $7,371.00 $725.00 $5,075.00 $550.00 $3,850.00 $550.00 $3,850.00 $550.00 $3,850.00 $930.00 $6,510.00 46 2 EA 206701A WEATHER SENSOR $526.50 $1,053.00 $750.00 $1,500.00 $500.00 $1,000.00 $500.00 $1,000.00 $500.00 $1,000.00 $963.00 $1,926.00 47 2 EA 206702A CONTROLLER $5,265.00 $10,530.00 $5,500.00 $11,000.00 $5,000.00 $10,000.00 $5,000.00 $10,000.00 $5,000.00 $10,000.00 $7,060.00 $14,120.00 48 2 EA 208400A WATER METER $4,212.00 $8,424.00 $2,800.00 $5,600.00 $5,000.00 $10,000.00 $1,000.00 $2,000.00 $500.00 $1,000.00 $18,700.00 $37,400.00 49 2 EA 208420A BACKFLOW PREVENTER $3,685.50 $7,371.00 $10,500.00 $21,000.00 $6,500.00 $13,000.00 $6,500.00 $13,000.00 $5,000.00 $10,000.00 $13,500.00 $27,000.00 50 2 EA 208442 FLOW SENSOR $1,579.50 $3,159.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $1,925.00 $3,850.00 51 1,800 SQFT 208451A SPRAY IRRIGATION $2.63 $4,738.50 $3.25 $5,850.00 $5.00 $9,000.00 $5.00 $9,000.00 $5.00 $9,000.00 $4.00 $7,200.00 52 2,785 SQFT 208452A DRIP IRRIGATION $3.16 $8,797.82 $5.00 $13,925.00 $6.00 $16,710.00 $6.00 $16,710.00 $6.00 $16,710.00 $6.00 $16,710.00 53 26 EA 208453A TREE BUBBLER $105.30 $2,737.80 $300.00 $7,800.00 $100.00 $2,600.00 $100.00 $2,600.00 $100.00 $2,600.00 $385.00 $10,010.00 54 2 EA 208560A MASTER VALVE $1,579.50 $3,159.00 $1,200.00 $2,400.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00 $1,540.00 $3,080.00 55 2 EA 208568A GATE VALVE $789.75 $1,579.50 $725.00 $1,450.00 $550.00 $1,100.00 $550.00 $1,100.00 $550.00 $1,100.00 $930.00 $1,860.00 56 165 LF 208592A MAINLINE $16.85 $2,779.92 $18.00 $2,970.00 $65.00 $10,725.00 $65.00 $10,725.00 $65.00 $10,725.00 $96.00 $15,840.00 57 2 EA 208649 QUICK COUPLING VALVE $789.75 $1,579.50 $490.00 $980.00 $600.00 $1,200.00 $600.00 $1,200.00 $600.00 $1,200.00 $628.00 $1,256.00 58 3 EA 208684A DRIP CONTROL VALVE $1,263.60 $3,790.80 $800.00 $2,400.00 $550.00 $1,650.00 $550.00 $1,650.00 $550.00 $1,650.00 $1,025.00 $3,075.00 59 194 CY 210110 IMPORTED TOPSOIL $252.72 $49,027.68 $160.00 $31,040.00 $136.00 $26,384.00 $136.00 $26,384.00 $135.00 $26,190.00 $205.00 $39,770.00 60 973 CY 260203 CLASS 2 AGGREGATE BASE (CY) $315.90 $307,370.70 $180.00 $175,140.00 $215.90 $210,070.70 $150.00 $145,950.00 $110.00 $107,030.00 $270.00 $262,710.00 61 3.9 TON 390100 PRIME COAT $2,895.75 $11,293.43 $650.00 $2,535.00 $1,912.23 $7,457.70 $1,200.00 $4,680.00 $1,000.00 $3,900.00 $4,910.00 $19,149.00 62 857 TON 390132 HOT MIX ASPHALT (TYPE A) $339.07 $290,579.56 $175.00 $149,975.00 $193.08 $165,469.56 $188.00 $161,116.00 $225.00 $192,825.00 $266.00 $227,962.00 63 77 LF 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) $121.10 $9,324.32 $40.00 $3,080.00 $110.45 $8,504.65 $50.00 $3,850.00 $10.00 $770.00 $144.00 $11,088.00 64 2.3 TON 397005 TACK COAT $2,764.13 $6,357.49 $650.00 $1,495.00 $2,730.02 $6,279.05 $3,600.00 $8,280.00 $1,000.00 $2,300.00 $5,340.00 $12,282.00 65 31,426 SQFT 398001 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) $13.16 $413,644.73 $1.00 $31,426.00 $2.00 $62,852.00 $0.70 $21,998.20 $2.00 $62,852.00 $3.00 $94,278.00 66 219 SQYD 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT $84.24 $18,448.56 $45.00 $9,855.00 $54.33 $11,898.27 $12.00 $2,628.00 $35.00 $7,665.00 $45.00 $9,855.00 67 150 CY 401050 JOINTED PLAIN CONCRETE PAVEMENT $710.78 $106,616.25 $500.00 $75,000.00 $824.72 $123,708.00 $1,000.00 $150,000.00 $825.00 $123,750.00 $1,630.00 $244,500.00 68 1,122 SQYD 418005 REMOVE CONCRETE PAVEMENT (SQYD) $94.77 $106,331.94 $25.00 $28,050.00 $75.10 $84,262.20 $30.00 $33,660.00 $60.00 $67,320.00 $65.00 $72,930.00 69 2,953 SQFT 474000A (F) - BLOCK WALL $83.17 $245,589.02 $150.00 $442,950.00 $224.30 $662,357.90 $150.00 $442,950.00 $200.00 $590,600.00 $184.00 $543,352.00 70 615 LF 490608 54" CAST-IN-DRILLED-HOLE CONCRETE PILING $1,368.90 $841,873.50 $1,020.00 $627,300.00 $833.99 $512,903.85 $1,100.00 $676,500.00 $1,200.00 $738,000.00 $1,228.00 $755,220.00 71 1 LS 500001 PRESTRESSING CAST-IN-PLACE CONCRETE $103,194.00 $103,194.00 $92,500.00 $92,500.00 $109,500.00 $109,500.00 $115,000.00 $115,000.00 $100,000.00 $100,000.00 $135,000.00 $135,000 .00 72 F 166 CY 510053 (F) - STRUCTURAL CONCRETE, BRIDGE $2,579.85 $428,255.10 $3,700.00 $614,200.00 $1,867.01 $309,923.66 $2,100.00 $348,600.00 $4,500.00 $747,000.00 $1,820.00 $302,120.00 73 F 260 CY 510054 (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) $2,869.43 $746,050.50 $1,200.00 $312,000.00 $1,488.85 $387,101.00 $3,300.00 $858,000.00 $1,000.00 $260,000.00 $2,400.00 $624,000.00 74 F 235 CY 510060 (F) - STRUCTURAL CONCRETE, RETAINING WALL $1,579.50 $371,182.50 $2,100.00 $493,500.00 $1,992.90 $468,331.50 $2,500.00 $587,500.00 $1,800.00 $423,000.00 $2,335.00 $548,725.00 75 F 4.2 CY 510503A (F) -MINOR CONCRETE (BIORETENTION CHECK DAM) $3,159.00 $13,267.80 $11,000.00 $46,200.00 $2,942.36 $12,357.91 $5,000.00 $21,000.00 $3,000.00 $12,600.00 $8,450.00 $35,490.00 76 F 5.8 CY 510535A (F) -MINOR CONCRETE (HEADWALL) $6,000.00 $34,800.00 $4,200.00 $24,360.00 $4,841.01 $28,077.86 $2,700.00 $15,660.00 $4,000.00 $23,200.00 $3,080.00 $17,864.00 77 96 LF 519088 JOINT SEAL (MR 1") $115.83 $11,119.68 $165.00 $15,840.00 $84.27 $8,089.92 $175.00 $16,800.00 $225.00 $21,600.00 $285.00 $27,360.00 78 F 214,400 LB 520102 (F) - BAR REINFORCING STEEL (BRIDGE) $2.37 $507,967.20 $2.00 $428,800.00 $1.34 $287,296.00 $1.34 $287,296.00 $2.00 $428,800.00 $1.75 $375,200.00 79 F 59,300 LB 520103 (F) - BAR REINFORCING STEEL (RETAINING WALL) $3.16 $187,328.70 $2.00 $118,600.00 $1.40 $83,020.00 $1.40 $83,020.00 $2.00 $118,600.00 $1.80 $106,740.00 80 200 LF 600017 REMOVE RETAINING WALL (LF) $105.30 $21,060.00 $100.00 $20,000.00 $193.02 $38,604.00 $135.00 $27,000.00 $250.00 $50,000.00 $235.00 $47,000.00 81 1 LS 600097 BRIDGE REMOVAL $105,300.00 $105,300.00 $100,000.00 $100,000.00 $131,946.27 $131,946.27 $133,200.00 $133,200.00 $300,000.00 $300,000.00 $275,000.00 $275,0 00.00 82 1,738 SQFT 627001A BIORETENTION PLANTER $105.30 $183,011.40 $250.00 $434,500.00 $144.44 $251,036.72 $50.00 $86,900.00 $160.00 $278,080.00 $275.00 $477,950.00 83 369 LF 641101 12" PLASTIC PIPE $336.96 $124,338.24 $140.00 $51,660.00 $466.78 $172,241.82 $350.00 $129,150.00 $160.00 $59,040.00 $820.00 $302,580.00 84 1,048 LF 641103A 4" PLASTIC PIPE $63.18 $66,212.64 $90.00 $94,320.00 $145.12 $152,085.76 $55.00 $57,640.00 $30.00 $31,440.00 $32.00 $33,536.00 85 80 LF 641105A 6" PLASTIC PIPE $73.71 $5,896.80 $117.00 $9,360.00 $217.31 $17,384.80 $300.00 $24,000.00 $150.00 $12,000.00 $460.00 $36,800.00 86 30 LF 641106A 8" PLASTIC PIPE $110.57 $3,316.95 $200.00 $6,000.00 $581.33 $17,439.90 $300.00 $9,000.00 $40.00 $1,200.00 $470.00 $14,100.00 87 237 LF 680286A 4" PERFORATED PLASTIC PIPE UNDERDRAIN $52.65 $12,478.05 $70.00 $16,590.00 $37.26 $8,830.62 $40.00 $9,480.00 $25.00 $5,925.00 $31.00 $7,347.00 88 11 EA 680288A CLEANOUT $1,053.00 $11,583.00 $1,500.00 $16,500.00 $880.51 $9,685.61 $900.00 $9,900.00 $1,000.00 $11,000.00 $2,360.00 $25,960.00 89 70 LF 703233 GRATED LINE DRAIN $573.89 $40,171.95 $1,300.00 $91,000.00 $136.33 $9,543.10 $1,400.00 $98,000.00 $500.00 $35,000.00 $430.00 $30,100.00 90 3 EA 705510A 12" CHECK VALVE $3,159.00 $9,477.00 $20,000.00 $60,000.00 $3,536.22 $10,608.66 $12,500.00 $37,500.00 $7,000.00 $21,000.00 $7,155.00 $21,465.00 91 4 EA 707501A AREA DRAIN $6,318.00 $25,272.00 $8,000.00 $32,000.00 $5,473.79 $21,895.16 $4,000.00 $16,000.00 $4,000.00 $16,000.00 $4,650.00 $18,600.00 92 2 EA 707502A DRY WELL $3,159.00 $6,318.00 $15,000.00 $30,000.00 $9,730.32 $19,460.64 $27,000.00 $54,000.00 $25,000.00 $50,000.00 $23,000.00 $46,000.00 93 5 EA 707505A OVERFLOW STRUCTURE $4,212.00 $21,060.00 $10,000.00 $50,000.00 $18,249.14 $91,245.70 $5,500.00 $27,500.00 $10,000.00 $50,000.00 $7,525.00 $37,625.00 94 2 EA 707506A STORM DRAIN MANHOLE $11,709.36 $23,418.72 $13,000.00 $26,000.00 $32,032.67 $64,065.34 $16,400.00 $32,800.00 $20,000.00 $40,000.00 $12,150.00 $24,300.00 95 2 EA 707507A CURB INLET RETENTION STRUCTURE $5,000.00 $10,000.00 $20,000.00 $40,000.00 $29,163.64 $58,327.28 $22,500.00 $45,000.00 $20,000.00 $40,000.00 $14,500.00 $29,000.00 96 193 LF 710136 REMOVE PIPE (LF) $126.36 $24,387.48 $50.00 $9,650.00 $69.26 $13,367.18 $50.00 $9,650.00 $80.00 $15,440.00 $495.00 $95,535.00 97 3 EA 710150 REMOVE INLET $2,295.54 $6,886.62 $2,200.00 $6,600.00 $2,960.84 $8,882.52 $1,500.00 $4,500.00 $5,000.00 $15,000.00 $2,240.00 $6,720.00 98 1 EA 710243A REPLACE GRATE $1,053.00 $1,053.00 $1,400.00 $1,400.00 $1,332.72 $1,332.72 $1,500.00 $1,500.00 $4,000.00 $4,000.00 $1,900.00 $1,900.00 99 31 SQYD 720009A REMOVE CONCRETE BAG SLOPE PROTECTION $421.20 $13,057.20 $300.00 $9,300.00 $63.67 $1,973.77 $300.00 $9,300.00 $300.00 $9,300.00 $360.00 $11,160.00 100 41 SQYD 721814A CONCRETE BAG SLOPE PROTECTION $1,684.80 $69,076.80 $930.00 $38,130.00 $468.92 $19,225.72 $700.00 $28,700.00 $1,000.00 $41,000.00 $1,430.00 $58,630.00 101 1,740 CY 723050
ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B)
(CY) $232.50 $404,554.18 $270.00 $469,800.00 $369.74 $643,347.60 $400.00 $696,000.00 $300.00 $522,000.00 $352.00 $612,480.00 102 553 CY 723080
ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B)
(CY) $352.76 $195,073.52 $270.00 $149,310.00 $263.23 $145,566.19 $200.00 $110,600.00 $200.00 $110,600.00 $345.00 $190,785.00 103 1,100 SQYD 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) $6.32 $6,949.80 $15.00 $16,500.00 $1.16 $1,276.00 $3.00 $3,300.00 $3.00 $3,300.00 $29.00 $31,900.00 104 920 LF 730010 MINOR CONCRETE (CURB) $300.00 $276,000.00 $58.00 $53,360.00 $40.00 $36,800.00 $65.00 $59,800.00 $50.00 $46,000.00 $96.00 $88,320.00 105 126 SQFT 730070 DETECTABLE WARNING SURFACE $84.24 $10,614.24 $60.00 $7,560.00 $45.31 $5,709.06 $50.00 $6,300.00 $45.00 $5,670.00 $79.00 $9,954.00 106 1,383 LF 731505A MINOR CONCRETE (CURB AND GUTTER) $105.30 $145,629.90 $70.00 $96,810.00 $70.36 $97,307.88 $100.00 $138,300.00 $80.00 $110,640.00 $72.00 $99,576.00 107 2,876 SQFT 731517A MINOR CONCRETE (DRIVEWAY) $20.01 $57,540.13 $18.00 $51,768.00 $17.58 $50,560.08 $35.00 $100,660.00 $20.00 $57,520.00 $25.00 $71,900.00 108 6,600 SQFT 731522A MINOR CONCRETE (SIDEWALK) $17.90 $118,146.60 $14.00 $92,400.00 $21.00 $138,600.00 $25.00 $165,000.00 $15.00 $99,000.00 $16.50 $108,900.00 109 8 EA 731624A MINOR CONCRETE (CURB RAMP) $5,265.00 $42,120.00 $3,800.00 $30,400.00 $2,874.54 $22,996.32 $3,500.00 $28,000.00 $3,000.00 $24,000.00 $5,640.00 $45,120.00 110 1,044 LF 731710 REMOVE CONCRETE CURB (LF) $31.59 $32,979.96 $20.00 $20,880.00 $17.83 $18,614.52 $40.00 $41,760.00 $20.00 $20,880.00 $14.00 $14,616.00 111 7,499 SQFT 731821A REMOVE CONCRETE SIDEWALK AND DRIVEWAY (SQFT) $8.42 $63,171.58 $4.00 $29,996.00 $3.76 $28,196.24 $7.00 $52,493.00 $5.00 $37,495.00 $5.00 $37,495.00 112 540 LB 750501 (F) -MISCELLANEOUS METAL (BRIDGE) $30.00 $16,200.00 $20.00 $10,800.00 $19.06 $10,292.40 $40.00 $21,600.00 $25.00 $13,500.00 $24.00 $12,960.00 113 181 LF 770001A 10" PVC WATER MAIN $336.96 $60,989.76 $370.00 $66,970.00 $218.66 $39,577.46 $750.00 $135,750.00 $765.00 $138,465.00 $893.00 $161,633.00 114 4 EA 770002A 10" VALVES FOR WATER MAIN $3,159.00 $12,636.00 $6,400.00 $25,600.00 $5,139.69 $20,558.76 $6,000.00 $24,000.00 $5,000.00 $20,000.00 $8,300.00 $33,200.00 115 1 EA 780249A REPLACE FIRE HYDRANT ASSEMBLY AND LATERAL $15,000.00 $15,000.00 $19,800.00 $19,800.00 $13,313.53 $13,313.53 $22,850.00 $22,850.00 $15,000.00 $15,000.00 $28,700.00 $28,700.00 116 1 EA 780251A
REPLACE FIRE HYDRANT ASSEMBLY AND LATERAL TO
FINISHED GRADE $15,000.00 $15,000.00 $8,800.00 $8,800.00 $13,313.53 $13,313.53 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $16,255.00 $16,255.00 117 2 EA 780252A
ADJUST SANITARY SEWER CLEANOUT TO FINISHED
GRADE $2,106.00 $4,212.00 $2,200.00 $4,400.00 $2,090.75 $4,181.50 $1,500.00 $3,000.00 $250.00 $500.00 $1,725.00 $3,450.00 118 1 EA 780253A ADJUST SANITARY SEWER MANHOLE TO FINISHED GRADE $2,632.50 $2,632.50 $3,100.00 $3,100.00 $2,358.34 $2,358.34 $4,500.00 $4,500.00 $1,000.00 $1,000.00 $4,455.00 $4,455.00 119 3 EA 780255A ADJUST WATER VALVE TO FINISHED GRADE $2,106.00 $6,318.00 $1,700.00 $5,100.00 $5,073.59 $15,220.77 $2,000.00 $6,000.00 $1,000.00 $3,000.00 $1,535.00 $4,605.00 120 1 EA 780261A
RELOCATE GAS MAIN AND ADJUST GAS VALVE TO
FINISHED GRADE $4,212.00 $4,212.00 $4,100.00 $4,100.00 $35,555.12 $35,555.12 $64,400.00 $64,400.00 $10,000.00 $10,000.00 $67,000.00 $67,000.00 121 521 LF 780434A PAINT CURB (2-COAT) (LF) $12.64 $6,583.36 $6.00 $3,126.00 $10.07 $5,246.47 $6.00 $3,126.00 $6.00 $3,126.00 $14.00 $7,294.00 122 3,698 SQFT 780460 (F) - ANTI-GRAFFITI COATING $11.06 $40,886.94 $7.90 $29,214.20 $4.20 $15,531.60 $7.90 $29,214.20 $10.00 $36,980.00 $20.00 $73,960.00 123 1 LS 783001A PRECAST STAIR SYSTEM $42,120.00 $42,120.00 $67,000.00 $67,000.00 $78,259.47 $78,259.47 $18,800.00 $18,800.00 $75,000.00 $75,000.00 $27,000.00 $27,000.00 124 20 EA 783002A STEEL BOLLARD $1,579.50 $31,590.00 $1,043.00 $20,860.00 $1,043.00 $20,860.00 $1,500.00 $30,000.00 $1,000.00 $20,000.00 $1,325.00 $26,500.00 125 1 LS 783003A RECONSTRUCT DRIVEWAY PILASTERS AND GATES $52,650.00 $52,650.00 $35,000.00 $35,000.00 $28,478.69 $28,478.69 $58,100.00 $58,100.00 $15,000.00 $15,000.00 $45,000.00 $45,000.00 126 123 LF 803015 REMOVE WOOD FENCE $52.65 $6,475.95 $68.00 $8,364.00 $42.60 $5,239.80 $20.00 $2,460.00 $70.00 $8,610.00 $135.00 $16,605.00 127 225 LF 803111A REMOVE AND REPLACE WOOD FENCE AND GATE $210.60 $47,385.00 $102.00 $22,950.00 $102.00 $22,950.00 $100.00 $22,500.00 $100.00 $22,500.00 $138.00 $31,050.00 128 66 EA 810230 PAVEMENT MARKER (RETROREFLECTIVE) $26.85 $1,772.20 $15.00 $990.00 $55.94 $3,692.04 $15.00 $990.00 $15.00 $990.00 $28.00 $1,848.00 129 7 EA 820250 REMOVE ROADSIDE SIGN $157.95 $1,105.65 $150.00 $1,050.00 $150.00 $1,050.00 $150.00 $1,050.00 $150.00 $1,050.00 $123.00 $861.00 130 1 EA 820310 REMOVE ROADSIDE SIGN PANEL $105.30 $105.30 $100.00 $100.00 $100.00 $100.00 $100.00 $100.00 $100.00 $100.00 $85.00 $85.00 131 5 EA 820530 RESET ROADSIDE SIGN $365.39 $1,826.96 $350.00 $1,750.00 $350.00 $1,750.00 $350.00 $1,750.00 $350.00 $1,750.00 $635.00 $3,175.00 132 1 EA 820560
RESET ROADSIDE SIGN (STRAP AND SADDLE BRACKET
METHOD) $105.30 $105.30 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $575.00 $575.00 133 14 EA 820610 RELOCATE ROADSIDE SIGN $400.14 $5,601.96 $350.00 $4,900.00 $350.00 $4,900.00 $350.00 $4,900.00 $350.00 $4,900.00 $635.00 $8,890.00 134 F 444 LF 833088 (F) - TUBULAR HANDRAILING $130.57 $57,973.97 $149.00 $66,156.00 $149.00 $66,156.00 $149.00 $66,156.00 $150.00 $66,600.00 $215.00 $95,460.00 135 898 LF 839515A STEEL HANDRAILING $157.95 $141,839.10 $183.00 $164,334.00 $183.00 $164,334.00 $183.00 $164,334.00 $190.00 $170,620.00 $239.00 $214,622.00 136 F 330 LF 839716A (F) - CONCRETE BARRIER (TYPE 85SW MODIFIED) $842.40 $277,992.00 $920.00 $303,600.00 $827.50 $273,075.00 $880.00 $290,400.00 $900.00 $297,000.00 $878.00 $289,740.00 137 F 114 LF 839717A (F) - CONCRETE BARRIER (TYPE 85A) $526.50 $60,021.00 $1,020.00 $116,280.00 $1,071.31 $122,129.34 $940.00 $107,160.00 $1,000.00 $114,000.00 $1,200.00 $136,800.00 138 223 SQFT 840516
THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET
NIGHT VISIBILITY) $24.00 $5,352.00 $15.00 $3,345.00 $20.14 $4,491.22 $15.00 $3,345.00 $15.00 $3,345.00 $26.00 $5,798.00 139 134 SQFT 840518A
GREEN THERMOPLASTIC PAVEMENT MARKING
(ENHANCED WET NIGHT VISIBILITY) $26.33 $3,527.55 $28.00 $3,752.00 $39.16 $5,247.44 $28.00 $3,752.00 $28.00 $3,752.00 $50.00 $6,700.00 140 775 LF 846007
6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET
NIGHT VISIBILITY) $8.42 $6,528.60 $4.00 $3,100.00 $11.19 $8,672.25 $4.00 $3,100.00 $4.00 $3,100.00 $8.00 $6,200.00 141 96 LF 846008
6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET
NIGHT VISIBILITY) (BROKEN 8-4) $7.37 $707.62 $4.00 $384.00 $11.19 $1,074.24 $4.00 $384.00 $4.00 $384.00 $8.00 $768.00 142 965 LF 846013
12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET
NIGHT VISIBILITY) $10.53 $10,161.45 $10.00 $9,650.00 $20.14 $19,435.10 $10.00 $9,650.00 $10.00 $9,650.00 $19.00 $18,335.00 143 839 LF 840657A PAINT TRAFFIC STRIPE (2-COAT) (CALTRANS DETAIL 22) $3.16 $2,650.40 $5.50 $4,614.50 $4.47 $3,750.33 $5.50 $4,614.50 $5.00 $4,195.00 $10.00 $8,390.00 144 388 LF 840658A PAINT TRAFFIC STRIPE (2-COAT) (CALTRANS DETAIL 27B) $3.16 $1,225.69 $2.40 $931.20 $8.95 $3,472.60 $2.40 $931.20 $2.00 $776.00 $5.00 $1,940.00 145 50 LF 840659A PAINT TRAFFIC STRIPE (2-COAT) (CALTRANS DETAIL 40) $3.16 $157.95 $2.20 $110.00 $8.95 $447.50 $2.20 $110.00 $2.00 $100.00 $5.00 $250.00 146 2 EA 870138A CONTROLLER ELECTRICAL SERVICE $8,424.00 $16,848.00 $4,000.00 $8,000.00 $4,000.00 $8,000.00 $25,000.00 $50,000.00 $5,000.00 $10,000.00 $5,000.00 $10,000.00 147 1 LS 871901A CONDUIT SYSTEM AND PULL BOXES $75,000.00 $75,000.00 $180,000.00 $180,000.00 $180,000.00 $180,000.00 $183,000.00 $183,000.00 $200,000.00 $200,000.00 $215,000.00 $215,000 .00 148 1 LS 872131 MODIFY LIGHTING SYSTEMS $100,000.00 $100,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $65,500.00 $65,500.00 $20,000.00 $20,000.00 $25,000.00 $25,000.00 149 1 LS 999990 MOBILIZATION $1,092,842.14 $1,092,842.14 $930,000.00 $930,000.00 $927,334.61 $927,334.61 $988,000.00 $988,000.00 $1,000,000.00 $1,000,000.00 $885,000. 00 $885,000.00 150 1 LS 051250A MAINTAIN AND RELOCATE ERUV $10,000.00 $10,000.00 $6,500.00 $6,500.00 $7,887.18 $7,887.18 $6,500.00 $6,500.00 $10,000.00 $10,000.00 $12,000.00 $12,000.00 151 1 LS 784000A REMOVE AND REPLACE BRICK/PATH IN-KIND $10,000.00 $10,000.00 $7,000.00 $7,000.00 $11,647.24 $11,647.24 $7,500.00 $7,500.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00 Sub Total = $12,041,263.55 $9,399,787.40 $10,303,233.57 $10,099,123.60 $10,707,482.50 $13,263,330.50 Percentage Lower/Higher than Engineer's Estimate = -21.94% -14.43% -16.13% -11.08% 10.15% Lowest Bidder = $9,399,787.40
Contingencies (10%) = $1,204,126.35 $939,978.74
PROJECT TOTAL COST $13,245,389.90 $10,339,766.14
Bid Amounts Received = $10,303,250.00 $10,488,823.60
Gordon N. Ball, Inc Joseph J. Albanese, Inc
QUANTITY UNIT UNIT COST UNIT COST UNIT COST UNIT COST UNIT COST UNIT COST IFB Post Date 4/15/2025
IFB Due Date 5/13/2025-3:00pm
Engineer's Estimate Granite Construction Company A & B Construction Ghilotti Construction
Company
1 of 1 S:\PWD\STORM\CIP\PE-12011 Newell Bridge Project\0.2 Contractor Bid Proposals\Bid Summary\Bid Summary Comparison