Cities Index.
Agenda packet

Paso Robles City Council
May 16, 2023

Document
Agenda packet
Meeting
May 16, 2023
Body
Paso Robles City Council
Pages
362
Original file
25.5 MB
Text extracted from the city's file for reading and search. Open the original on pub-pasorobles.escribemeetings.com. That file is the official record.

When groundwater is encountered, the trench shall be kept dewatered until the laying and jointing of the pipe, andpipe and placing of the bedding material has been completed and observed by the City inspector. The Contractor shall place not less than six inches of 2-1/2” maximum size rock below the required bedding material, or otherwise de-water the trench in a manner which has received prior approval of the Engineer.

Temporary covers of 3/8" steel plate of sufficient size to adequately cover the opening shall be placed on manhole cones until the pavement is completed. Ribs shall be welded to the underside of the cover to hold it in place during the grading and paving operations.

The total depth of the manhole throat measured from the top of the frame shall not exceed eighteen (18) inches. Manhole frames and lids shall be placed a minimum of 12" above natural ground or high water when placed in easements outside of unpaved or easement road areas.

B. Safety
All safety orders, rules, or recommendations of the Occupational Safety and Health Administration (OSHA) and the Division of Industrial Safety of the Department of Industrial Relations of the State of California, applicable to this work, shall be obeyed and enforced. All work shall be performed in accordance with the requirements of the State of California Division of Industrial Safety.

The Contractor shall conform to the permit requirements of the Division of Industrial Safety and Division of Occupational Safety and Health Division of Industrial Safety and shall obtain a trenching permit directly from said State Office prior to such activity.

A copy of the State trenching permit shall be available onsite, and shall be made available to the City Engineer upon request.

The Contractor's attention is directed to the provisions of the State Labor Code concerning trench excavation safety plans. (Note: Contractors are hereby advised that the independent monitoring regulations of OSHA, as enforced by CAL OSHA officers, is to be complied with at all times).

C. Bracing and Shoring
Adequate bracing and shoring, as required by the Division of Industrial Safety of the State of California, to protect personnel, adjacent property, and roadway areas shall be used. Any damage to structures occurring through settlement, water or earth pressure, slides, caves, or other causes due to failure or lack of sheeting or bracing or improper bracing, or through negligence or fault in any other manner, shall be repaired immediately to the approval of the City Engineer.As required by the "Trench Construction Safety Orders" of the California State Industrial Accident Commission, Attachment 1

Page 324 of 362 ends

sufficient bracing, shoring and access equipment shall be installed in trenches to ensure the safety of workmen, and to protect and facilitate the work. Where practical, all such bracing and shoring shall be removed from the trench as the backfilling proceeds.

D. Laying of Sewer Pipe
Pipe shall be laid in conformity to the lines and grades established on the approved plans. Pipe shall be laid continuously upgrade with the bell of the pipe opposite the direction of flowforward. Each length of pipe shall be laid on a firm bed and shall have a true bearing for the entire length. No wedging or blocking up of the pipe will be permitted.

Both bell and spigot shall be clean and lubricated before the joint is made. Care shall be taken that nothingnothing, but the joint-making material enters the joints. At the end of each work dayworkday the end of the pipe must be sealed to preclude infiltration of water, dirt or debris.

E. Trench Backfill
Bedding material meeting the minimum standards listed below, shall be deposited and compacted to 90% relative compaction in the trench uniformly on both sides of the pipe for the full width of the trench and to a depth of 12 inches over the top of the pipe (Standard Detail U-2).

Sand Equivalent 20
Sieve Size Percentage Passing Sieve
1" 1100
No. 4 80-100
No. 200 0-15
The balance of the backfill shall contain no rock or boulders in excess of two (2) inches and shall be free from all deleterious matter. Backfill shall be compacted to a minimum relative compaction of 90%. The top eighteen ( 12 18) inches shall be brought to 95% compaction. The backfill under and around any and allall pipes shall be thoroughly consolidated before any additional material is placed. Compaction methods must be carried outout, so no damage or displacement of the pipe occurs. Around circular manhole sections, small tools such as “jumping jack” type compactors shall be used to carefully compact the soil immediately around the manhole. A soils engineer shall confirm adequate compaction around all manholes.

F. Connection to Existing Manholes
Connection to existing manholes shall be made by carefully core-drilling an opening in the wall of the manhole. The pipe shall be inserted with elastomeric ring-seal Attachment 1

Page 325 of 362 ends

through the opening flush with the inside wall. The opening around the pipe shall be packed with a stiff mix of cement mortar, thoroughly compacted to form a watertight connection. The mortar shall be finished smooth and flush with the interior surface of the manhole. Channelizing of the flow through the manhole shall conform to the details shown on the standard Drawings for new manholes. Where chipping out of existing manhole base is required to accommodate a new sewer penetration, Contractor shall ensure debris is properly managed and disposed of, an under no circumstances shall debris flow into the existing sewer pipe.

The Contractor shall notify the City Engineer 72 72-hours in advance before any connection is made to existing structures. Work shall be scheduled so that interruption of flow is held to a minimum.

VI-4. TESTING
Prior to acceptance all sewer lines shall be cleaned, tested for leakage by a standard low pressurelow-pressure air or water test, tested for deflection with a mandrel, and inspected by video. All testing shall be performed after all backfill and compaction procedures are complete and prior to street paving. and after all backfill and compaction procedures are complete, streets have been graded and the sub-grade of structural street sections has been compacted and prepared appropriately.

Leakage test is by internal air pressure or water. Infiltration test is by measurement of rate of flow of water. Each section of pipe between manholes, along with the manholes, shall be tested. Use the air test where the difference in elevation between the invert of the upper structure and the invert of the lower structure is more than 10 feet.

Testing procedures shall be as outlined herebelow:

A. Air Test Procedure
Each section of sanitary sewer between two successive manholes shall be tested by plugging all pipe outlets with inflatable and expandable test plugs. Pressure-relief valves shall be set to limit the internal pipe test pressure to five pounds per square inch gauge pressure (5 psig). Air shall be slowly added until the internal pressure is raised to 4.0 psig. Care shall be taken to guard against the sudden expulsion of a poorly installed plug or a plug that is partially deflated.

The internal pressure of 4 psig shall be maintained for at least two minutes to allow the air temperature to stabilize after which the air supply shall be disconnected and the pressure allowed to decrease to 3.5 psig. The Table below provides the minimum time requirements for a pressure drop to occur from 3.5 psig to 3.0 psig.

Should the test disclose an air loss rate greater than permitted, the contractor shall, at his own expense, locate and repair the defective joints or pipe sections. After the Attachment 1

Page 326 of 362 ends

repairs are completed, the line shall be retested until the air loss rate is less than specified below.

Timetable:

Pipe Size Time
6" 4 minutes
8" 5 minutes
10" 6 minutes 30 seconds
12" 7 minutes 30 seconds
B. Water Test Procedure
Test each section of pipe between two successive structures by closing the lower end of the pipe to be tested and the inlet pipe of the upper structure with plugs or stoppers.

Fill the pipe and structure with water to a point 4 feet above the invert of the open pipe in the upper structure or to a height of 10 feet above the invert of the sewer in the lower structure, whichever gives the least hydrostatic pressure on the lower structure.

The total leakage shall be the decrease in volume of water in the upper structure. The leakage shall not exceed 0.025 gpm per inch of nominal diameter of pipe per 1,000 feet of pipe being tested.

If the leakage is greater than allowed, overhaul the pipe and, if necessary, replace and re-lay until the joints and pipe comply with this test. All Complete tests and any required repairs must be completed before the street over the trench is paved.

C. Test for Infiltration
If, in the construction of a section of the sewer between structures, excessive groundwater is encountered, close the end of the pipe at the upper structure sufficiently to prevent the entrance of water. Discontinue pumping groundwater for at least three days. Then test the section for infiltration. The infiltration shall not exceed

0.025 gpm per inch of diameter per 1,000 feet of main line pipe being tested.

Where infiltration exceeds the maximum acceptable, immediately uncover the pipe and reduce the infiltration to within the maximum acceptable by replacing, re-laying, or encasing the pipe in concrete.

D. Test Procedure - Force mains
See test procedures for water mains Section VII-4.

E. Test Procedure – Manholes
Water-tightness of manholes may be tested in connection with hydrostatic tests of the pipeline or at the time the manhole is completed and backfilled.

Fill the manhole with water to an elevation 1 foot below the bottom of the cone section with a maximum water depth of 20 feet. Plug inlets and outlets with stoppers or plugs Attachment 1

Page 327 of 362 ends

and fill the manhole to the limits indicated above. The maximum allowable drop in the water surface shall be 1/2 inch for each 15-minute period of testing.

Even though the infiltration is less than the maximum acceptable, stop any individual leaks that may be observed.

F. Cleaning
The contractor shall clean all lines with a Wayne-type sewer cleaning ball under hydrostatic pressure and shall apply a mandrel to test for deformation. The mandrel shall be the 9-vane design and sized to 95% of the nominal internal diameter of the pipe. Replace and re-lay until the pipe complies with the mandrel test.

G. Video
All new sewer main installations mustshall be observed inspected by video by the City’s Wastewater Division staff prior and reviewed forto acceptance by the Wastewater Division ManagerCity. Inspections may be scheduled by contacting the Wastewater Collections Supervisor at (805) 227-7200 ext. 6701. The video inspection will be used to check for any defects such as debris in the pipe and manholes, pipe deflection, offset joints, or damaged pipe. All defects will be documented and must be corrected prior to City acceptance and use. The video shall be DVD format and color quality. The video shall have a digital display with a date and pipeline footage as a minimum tape reference. The film must also be clear and legible with adequate lighting.

All videos shall include a written log. The log shall have a legible map and a North arrow. Manholes shall be marked respectively and directional arrows indicating flow shall be shown.

A gauge in front of the camera shall be used to measure the depth of debris or standing water. The maximum tolerance for the depth of standing water is 0.5 inches.

H. Placement and/or Replacement of Road Surfaces
Trench paving shall conform to Standard Detail U-2. New street paving shall conform to Section IV of these specifications.

All testing procedures outlined above must be completed prior to pavement replacement or new street paving. After street paving, all manholes shall be raised to grade and concrete collars shall be installed in accordance with Standard Detail F-3.

The concrete collar shall be stamped to show flow direction of sewer lines connected to the manhole. Prior to acceptance of new sewer lines, the lines shall be thoroughly cleaned once again.

Attachment 1

Page 328 of 362 ends

SECTION VII
WATER
VII-1. DESIGN GUIDELINESREQUIREMENTSSTANDARDS
Water pipelines and appurtenant structures within the jurisdiction of the City of Paso Robles shall be constructed by a California A-Licensed Contractor in accordance with plans prepared by a Professional Civil Engineer, consistent with these specifications and as approved by the City Engineer.

A. Design Flow

Water pipelines shall be designed such that water supply can be adequately delivered under maximum day demand plus fire-flow conditions. Minimum fire flow and number of hydrants shall be as required by the most current California Fire Code (CFC) and the City Fire Chief or his designee.

B. B. Distribution System
The distribution system, wherever possible, shall be in loop/grid form to increase fireflow capability, improve water quality, reduce maintenance costs, and better conserve water resources by reducing system-flushing requirements. If a dead end is unavoidable, mains shall meet the criteria specified in Paragraph D below and shall not exceed 1,000 linear feet. If an opportunity exists to create a looped system by extending main, the loop must be made. Dead-end mains must terminate with a standard fire hydrant. The design and installation of the water system must be compatible to serve the ultimate service area in accordance with the General Plan. All dead ends shall be approved by the City Engineer and Water Manager.

Water distribution systems shall be designed to maintain normal operating pressures of not less than 40 pounds per square inch gauge (psig) at the service connection during peak system demand. If 40 psig cannot be obtained, a City-approved booster pump station with backflow prevention is required. Booster stations shall be designed according to City Water Department requirements and approved by the City Engineer.

Concrete anchors and thrust blocks shall be provided at all discontinuities in accordance with Standard Details G-7.1 and G-7.2. Thrust restraint for piping larger than 12-inches shall be accomplished using restrained piping according to engineering calculations submitted with the design for review by the Water Manager.

C. C. Regulations Relating to Cross Connections
Attachment 1

Page 329 of 362 ends

Reference is also made to Title 17, Chapter V, Sections 7583-7622 inclusive of the California Administrative Code, regulating the construction of cross connections between drinking water systems and other sources of water. All industrial, commercial, multi-story buildings and landscape connections shall be equipped with an RP type backflow device located within 10-feet of the water meter. Additionally, all premises with an auxiliary water supply shall be equipped with an RP type backflow device on the potable connection located within 10-feet of the water meter.

Connections between the backflow device and the service meter are prohibited. All construction shall be in strict compliance with said regulations.

For premises where hazardous substances are handled in a manner that that can result in the substance entering the potable water system, or premises where an auxiliary water system is interconnected with the public potable water system, an air gap is required.

Residential fire sprinkler systems must be “passive purge”. Passive-purge fire sprinkler systems serve a single commonly used toilet in addition to the fire sprinklers.

The toilet shall be on a remote portion of the sprinkler system or the system shall be designed as a loop so that the water moves through a majority of the fire sprinkler system piping when the toilet is flushed. All other sprinkler systems must have an approved backflow device located within 10 feet of the water meter and require prior approval of the Fire Chief and Water Manager.

A.D.Water Main Minimum size
In general, the minimum main size pipe shall be not less than 8 inches inside diameter with the following exceptions:
1. Dead-end mains require special approval of the City Engineer, Fire and Water Manager. The minimum size for dead-end mains is to be determined based on pipeline length, fire-flow requirements, normal system pressures, anticipated demands, and the number of dwelling units served and must also satisfy the following:
 6-inch mains must be less than 150-feet long, serve fewer than 10 dwelling units, not be planned for future extension and must be approved by Water Manager.

B.E. Water Main Location and Depths
All City owned Utilities, including water mains, shall be located in public streets. Water mains are, typically located six six- feet north or west of the centerline of the right-ofway. Where a public road is not available a water main may be located in an easement specifically dedicated to the City for the purposes of construction, operation and maintenance of a water main. The minimum width of the easement shall be 20 feet, or 30 feet if located between two structures. A 12-foot wide12-foot-wide asphalt Attachment 1

Page 330 of 362 ends

cement or all-weather aggregate base access road capable of supporting 60,000 lbs. of equipment must be provided in the easement. Alternative surfaces are not acceptable. For private eEasements for water mains , or mains installed in HOAowned and maintained streets, the easement or agreement shall include a provision that surface repair by City is limited to backfilling, compaction and aggregate base roadway or AC pavement per City standards only; restoration of other surface improvements and features shall be the responsibility of the private entity.

Fences, landscaping or other obstacles that might limit access shall not be placed around, above, or within the easement.

Water mains located in roundabouts require special consideration and the designer is encouraged to contact the City prior to the start of design. Typically, wWater mains through roundabouts shall be ductile iron and fully restrained through the roundabout.

Roundabout center islands shall be landscaped. When City utilities are located in the center island, trees, large boulders, monuments, signs, and other features that obstruct access s are prohibited.

Fences, landscaping or other obstacles that might limit access shall not be placed around, above, or within the easement.

Water mains shall be installed at a depth which will provide a minimum cover of 36 inches over the top of the pipe measured from the finished grade of the street. Mains 12 inches and larger, or any water main not located in a public street, shall have minimum cover of 48 inches. All new mains shall have a minimum clearance of 18 inches vertically between all crossing utilities.

Horizontal and vertical separation between water mains and wet utilities shall be as shown in Standard Drawing U-1 and comply with Water Code Section 64572.

Upgrading water main material to ductile iron and other special construction provisions may be required where a water main is designed to cross under a sewer, storm drain, or recycled water main or lateral. Where minimum separation requirements between water mains or services and other utilities is not feasible, the engineer shall propose an alternate that will provide at least the same level of protection to public health as the minimum separation requirements. If the water main is proposed to cross under other utilities, upgrading to ductile iron pipe and other special construction provisions will be required. The alternative must be submitted in writing and approved by the City Water Manager and the State of California Division of Drinking Water (DDW).

C.F. Water Services
New water service connections shall be made to the City’s potable water system only.

Extension of potable water service to a parcel or customer through a new or existing private water line is prohibited. Water services and meters shall be placed a minimum of five feet from any property line and 10-feet from any sewer lateral. Water services shall be spaced a minimum of 18 inches apart. Service lines shall normally be installed Attachment 1

Page 331 of 362 ends

at the time the main is constructed to avoid frequent cutting of the street. Services are to be sized according to the meter being installed at the time water service begins.

Dedicated landscape water meters are required for non-residential landscapes larger than 1,000 square-feet and are highly recommended on all non-residential landscape areas to facilitate water management.

D.G. Valves
Gate valves shall be attached by flange on all legs of tees and crosses. In-line valves should be installed at increments of 600 feet on continuous lines without main intersections and connect to the main with mechanical joint (MJ) fittings. Valves should also be spaced so that not more than two fire hydrants should be out of service at any one time. Valves 12-inches and larger shall be butterfly type.

E.H. Fire Hydrants
Fire hydrants shall be placed at street intersections whenever possible and should be located to minimize the hazard of damage by traffic. The average spacing between hydrants should not exceed that required by the most current California Fire Code or otherwise specified by the City’s Fire Chief. All joints and fittings between the main and the hydrant shall have thrust restraint. The minimum size main serving the fire hydrant shall be 6-inch ductile iron with a gate valve installed at the main and all as shown on City Standard Detail No. G-1.

F.I. Air and Vacuum Release Valves
Air and vacuum release valves shall be installed in accordance with City Standard Detail No. G-8 at all high points along a main where it is likely that air pockets may form. All valves shall be designed for a minimum of 150 PSI operating pressure. A gate valve (for connections greater than 2-inch in diameter) or corporation stop (for connections equal to or less than 2 inches) shall be installed at the connection to the main to provide a positive closure between the main pipeline and the air and vacuum release valve. The air and vacuum release vent outlet shall be installed above ground in such manner as to prevent back-flow.

G.J. Blow-offs
Blow-offs (BOs) shall be installed in accordance with City Standard Detail No. G-9 at all low points along the main to provide for adequate flushing, draining and maintenance. Four-inch BOs are to be installed on pipeline sizes 14-inches and smaller and 6-inch BOs are to be installed on pipelines 16-inches and larger.

VII-2. MATERIALS
Attachment 1

Page 332 of 362 ends

All materials for potable water service shall comply with AWWA and NSF requirements, and these specifications.

A. Pipe
Pipe used in the construction of water distribution systems shall be either ductile iron or PVC and shall meet the standards of the American Water Works Association (A.W.W.A.) where applicable. The City Water Manager may specify which types shall be used in any instance.
.

2. 1. PVC pipe shall be a minimum of DR18 and shall conform to and meet the requirements of AWWA Specification C900 for sizes 4-inches through 10- inches.

2. Ductile iron pipe 12-inches and larger shall be pressure class 350, approved by City Water Manager, and shall conform to AWWA C151.

3. 3. Thrust restraint for piping 12-inches and larger shall be Mega Lug, TR Flex or approved equal. Restrained push-on joints utilizing a "gripping” or friction force for restraint are not permitted for piping over 10 inches.

4. 4. Ductile iron pipe and fittings must be installed with a polyethylene encasement per AWWA C105/21.5.

5. 5. Insulated solid core AWG 12 locator wire must be installed and taped to the top of all new pipes. All locator wire connections are to be made with water/weather tight connectors.

B. Fittings
Bends, elbows, tees, crosses, and special fittings shall be cast iron or ductile iron and shall conform to and meet requirements of AWWA Specification C110. At connections to adjacent pipe, the fittings shall have rubber gasket joints conforming to AWWA Specification C111 with the exception of push-on joints. Push-on fittings and push-on joints adjacent to valves and fittings are not permitted. All buried fittings shall be wrapped with polyethylene per AWWA C105/A21.5.

C. Bolts and Nuts for Flanges
Bolts and nuts for all flanges shall be Type 304 or 316 stainless steel conforming to ASTM A 193, Grade B8M, for bolts and ASTM A 194, Grade 8M, for nuts. All buried flanges shall be wrapped in polyethylene per AWWA C105/A21.5.

Provide Lubricant for Stainless Steel Bolts and Nuts. Lubricant must be NSF 61 approved.

D. Valves and Valve Boxes
Attachment 1

Page 333 of 362 ends

Valve boxes shall be installed in accordance with City Standard Detail No. G-6.

Valves shall have a 2-inch square operating nut, be resilient wedge, epoxy lined, open in counter-clockwise direction and meet the requirements of AWWA Specifications C509 for gate valves. The cover shall be marked "WATER". When the depth from finish grade to the operating nut of the valve is 4 feet or greater the valve operating nut shall be extended to within 6 inches of finished surface using a Fiberplas valve stem extension or approved equal.

Butterfly valves are required on mains 12-inches in diameter and larger and require approval by the City Engineer and Water Manager. All buried valves shall be wrapped with polyethylene per AWWA C105/A21.5.

E. Water Service Connections
Service lines shall have a 1-inch copper-tube-size (CTS) polyethylene (PE) for domestic single-family residential services serving 3/4 or 1-inch meters, and 2-inch PE CTS service lines shall be installed for 1.5- and 2-inch meters. Sizing for all other service lines (multifamily, commercial, industrial, or irrigation) shall be as shown on the plans and approved by the City Engineer and Water Manager. Water service connections shall be installed in accordance with City Standard Drawing Nos. G-2, G-3, or G-4.

VII-3. CONSTRUCTION GUIDELINES STANDARDS
At the time of construction, all work shall be according to current standards.

A. Connection to Existing Mains
The City Water Division shall be provided a minimum of 72 hours’ notice before a connection is made to any existing main. Notification shall include arrangement of a meeting at the site to discuss materials and operations associated with the connection.

The Water Division shall coordinate and perform all shutdowns of City water facilities.

Shutdowns may occur only when inconvenience to existing customers is minimized.

Connections shall be made only after complete and satisfactory preparation for such work has been made, in order that the shutdown may be as short as possible. The City Water Division will be responsible for all main valve operation.

Connections of fire lines and new water mains to existing water mains shall be accomplished by the installation of new tees and valves. Hot taps will occur only in circumstances specially approved by the Water Division Manager.

In-line valves shall be placed prior to construction of the new connection where existing in-line valves do not meet the design guidelines standards in Section VII-I; where the installation of in-line values will significantly reduce the number of Attachment 1

Page 334 of 362 ends

customers affected by interruption of service or where existing critical connections would otherwise be affected including schools or buildings with a high number of tenants.

B. Excavation for Water Lines
The minimum trench width shall be the nominal diameter of the pipe plus eighteen (18) inches and be ample to permit the proper installation of the pipe and appurtenances. (see City Standard Detail No. U-2)
Excavated material shall be piled in such a manner that it will not endanger the work and will offer minimum obstruction to traffic. Open trenches and waste piles shall be adequately barricaded and lighted.

The Contractor shall comply with all applicable safety orders, rules, or recommendations of the occupational Safety and Health Administration (OSHA) and the Division of Industrial Safety of the Department of Industrial Relations of the State of California.

C. Laying of Pipe
1. The pipe shall be laid true to line, with no visible change in alignment at any joint, unless curved alignment is shown on the plans. Full-length pipe sections are to be used wherever possible. Minimum pup length shall be 3 feet. 2. PVC pressure pipe (C900) may accommodate longitudinal bending with the following limitations: (1) The constructor shall block or brace pipe joints to ensure that bending of PVC pressure pipe does not result in axial deflection in the gasketed or mechanical joints. (2) The longitudinal bending in the PVC pipe barrel shall not result in a bending radius less than the minimum limits established in the Table below. (3) The bending of PVC pipe barrels larger than 12-inch nominal diameter is not permitted.

Minimum Allowable Bending Radius for PVC Pressure Pipe
Attachment 1

Page 335 of 362 ends

Nominal Size (Inches) Minimum Allowable Bending
Radius (Feet)
4 250
6 360
8 470
10 580
3. Deflection at fittings and couplings that allow angular joint offset may also be used to achieve gradual alignment changes. If permitted by the pipe/fitting manufacturer, the maximum allowable deflection at any joint shall not exceed 80% of the manufacturer's recommendation for the type of pipe and joint being used.
4. Place the specified thickness of pipe base material over the full width of trench.

Grade the top of the pipe base ahead of the pipelaying to provide firm, continuous, uniform support along the full length of pipe, and compact to the relative compaction specified herein. Before laying each section of the pipe, check the grade and correct any irregularities.
5. After pipe has been bedded, place pipe zone material simultaneously on both sides of the pipe, in maximum 8-inch lifts, keeping the level of backfill the same on each side. Carefully place the material around the pipe so that the pipe barrel is completely supported and no voids or uncompacted areas are left beneath the pipe. Use particular care in placing material on the underside of the pipe to prevent lateral movement during subsequent backfilling. 6. Thrust and Anchor Blocks shall be placed in accordance with City Standard Details No. G-7.1 and G-7.2 at bends of 11ଵ
ସ
, 22ଵ
ଶ
, 45 or 90 degrees; at the end
of plugged mains; behind each tee and cross and at the back of fire hydrants.

The thrust block shall extend from the fitting to undisturbed soil, shall be kept clear of the joints, and shall be of such bearing area as to assure adequate resistance to the water pressure force to be encountered. 7. Compact each lift to the relative compaction specified per City Standard Detail No. U-2.
8. Each section of pipe and each fitting shall be thoroughly cleaned before it is installed. All pipe, fittings, valves, etc., shall be carefully lowered into the trench by suitable tools or equipment, in such manner as to prevent damage to the pipe, lining, coating, fitting or other appurtenances. Under no circumstances shall pipe or accessories be dropped into the trench.

Attachment 1

Page 336 of 362 ends

9. Push the backfill material carefully onto the backfill previously placed in the pipe zone. Do not permit free-fall of the material until at least 2 feet of cover is provided over the top of the pipe.
10. Do not operate heavy equipment or a sheepsfoot wheel mounted on a backhoe over the pipe until at least 2 feet of compacted fill has been placed over the pipe.
11. Keep the trench dry until the pipelaying and jointing are complete 12. Whenever pipe placement is discontinued for short periods, or when work is stopped at the end of the day, the open ends of all mains shall be closed with water-tight plugs or bulkheads. The plug or bulkhead shall not be removed unless or until the trench is dry.
13. Valves shall be set plumb, supported on a concrete base and properly fitted to the adjacent sections of the main. A valve box shall be installed over each valve per City Standard Detail No. G-6
D. Trench Backfill
All the requirements for backfilling of sewer line trenches set forth in Section VI3E shall apply to backfill of water main trenches.

VII-4. TESTING
Final cleaning and testing of water lines shall take place after all construction work is completed, with the exception of final paving. Cleaning and testing shall be performed in the presence of the Water Department.

A. Flushing and Disinfecting
The system shall be thoroughly flushed out and disinfected in accordance with AWWA Standards and/or the requirements of the County Health Department prior to pressure testing.

B. Testing
Each section of the pipe shall be tested in accordance with following procedures. The pipe shall be slowly filled with water, and all air shall be expelled from the pipe. The release of the air can be accomplished by opening hydrants and service line cocks at the high points of the system and the blow-offs at all dead-end. After the system has been filled with water and all air expelled, all the valves controlling the section to be tested shall be closed, and the line be allowed to set for a period of not less than 24 hours. All line filling and valve operation shall be done by the City Water Division.

Attachment 1

Page 337 of 362 ends

The pipe shall then be refilled, if necessary, and subjected to a pressure of not less than 200 PSI or 50 PSI over the pipe class being installed, whichever is greater, for a period of not less than two hours. Test pressure must be maintained to within 5 psi without the use of makeup water.

Any leaks, cracks or defective pipe, fittings, valves, hydrants or other appurtenances discovered during the test shall be removed and replaced with sound material, and the test repeated until the system is proved satisfactory.

C. Replacement of Road Surfaces
Paving shall not proceed until all testing, flushing and disinfecting have been performed to the satisfaction of the City Engineer.

Attachment 1

Page 338 of 362 ends

Attachment 2
RESOLUTION 23-XXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES

APPROVING AMENDMENTS TO THE CITY STANDARD DETAILS AND SPECIFICATIONS WHEREAS, the City’s Standard Details and Specifications (City Standards) provide written specifications and detailed drawings to establish standards of tolerance and quality for public works construction; and WHEREAS, the current version of the City Standards was adopted by the City Council in February 2014 and last modified in October 2020; and
WHEREAS, the City Engineer is proposing additional updates to several parts of the City Standards to stay current with utility requirements, construction methods, and material changes; and WHEREAS, Amendments to the Standard Details and Specifications include the following:
a. Standard Specifications Section I – General Requirements:
 Clarified language in Section I – Purpose.
 Added and clarified definitions.
 Incorporated by reference other Council adopted plans and standards including Fire Standards and Codes, Paso Robles Municipal Code, Stormwater Ordinance, and Niblick Complete Streets Plan.
 Clarified that projects may be subject to other Agency requirements and that the City Standards do not exempt projects from complying with those requirements. b. Standard Specification Section II – Preparation of Plans  Incorporates a new design exception process to speed plan review and exception approval or rejection. Outlines minimum required information needed to justify an exception.
 Incorporates existing ADA requirements, provides references to design aids, and an exception process.
 Added Map Act Requirements for preservation of survey monuments during construction.
 Requires a Composite Utility Plan with Tract Map submittals.  Requires submittal of Record Drawings in GIS format. This will allow seamless incorporation of data into the City GIS System.
c. Section III – Construction Observation and Storm Water Quality Management  Added requirements for a preconstruction meeting.
 Added requirements for pipe bursting, compaction standards, flood elevation certificates and aligned flood elevation requirements with the City Municipal Code.  Added Standard notes for erosion control.
 Aligned City storm water requirements with State requirements that the City must implement. d. Section V – Storm Drains, Storm Water Quality, And Watershed Protection  Added information to help engineers to design storm water systems to comply with State requirements.
 Added additional requirements for Storm Water Control Plans.

Page 339 of 362 ends

Attachment 2
 Added design requirements for storm drain manholes, junction boxes and other storm water structures.
e. Section VI – Sanitary Sewers
 Added a section regarding sewer pipe sizing.
 Added information related to house lateral backflow devices and when needed.  Added information related to special construction of sewer lines related to locations near water mains.
 Clarified maximum sewer depth.
 Added a section on sewage lift station and force main design that used to be in the Standards but were removed during subsequent updates.
 Updated pipeline materials and color.
 Updated trenching safety requirements including bracing and shoring.  Updated sewer main video procedures.
f. Section VII - Water
 Added a requirement for a reduced pressure backflow device on potable connections when the property is served by an auxiliary water service (well, surface, or recycled water) in conformance with State water regulations.
 Added water main design criteria when installed in roundabouts.  Added special construction requirements, required by the State, where minimum separation from sewer or recycled water cannot be maintained.
g. Section VIII - Standard Drawings:

Drawing Description Drawing No. Amendment
Sewer Manhole with Precast Base F-1 Changed M.H. Size for large sewers.

Drop Manhole F-2 Minor Change to overflow pipe
outlet to the manhole.

Sewer Lateral Location F-5 Updates pipe connections,
clarified 6” lateral size for
commercial connections.
1-inch Water Service G-2 Require Nicor lid for automatic meter reading.
2-inch Water Service G-3 Require Nicor lid for future
automatic meter reading.

Reduced Pressure Device Installation G-12
Meter Box Detail for Large Services G-14 Added requirement for Nicor lid on separate box for future
automatic meter reading.

Fire Line Service Installation G-16 Required restrained ductile iron pipe on the City side of the
device consistent with fire
hydrants.

Underground Utility Locations U-2 Updated Paving Requirements to match State Standards.

Page 340 of 362 ends

Attachment 2

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. All of the above recitals are true and correct and incorporated herein by reference.

Section 2. The City Council hereby approves the amended City Standard Details and Specifications, attached hereto as Exhibit A, and incorporated herein by reference.

APPROVED this 16th day of May, 2023, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Steven W. Martin, Mayor
ATTEST:

Melissa Boyer, City Clerk

Page 341 of 362 ends

Council Agenda Report
From: Jonathan Stornetta, Fire Chief
Subject: Approval of Termination of Local Emergency Regarding January 2023 Storms CEQA Determination: Termination of the local emergency is not a project subject to the California Environmental Quality Act (State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378).

Date: May 16, 2023
Facts

1. On January 8, 2023, the President of the United States declared that an emergency exists in the State of California and ordered Federal assistance to supplement State, tribal, and local response efforts due to the emergency conditions resulting from successive and severe winter storms, flooding, and mudslides.

2. On January 9, 2023, the Emergency Services Director for the County of San Luis Obispo issued a Proclamation of a Local Emergency related to severe winter storms and a series of atmospheric river systems that struck California beginning on December 27, 2022, bringing high winds, substantial rainfall, significant flooding, falling debris, downed trees, and widespread power outages.

3. The Acting City Manager approved a local emergency declaration on January 9, 2023.

4. On January 12, 2023, the City Council approved Resolution 23-001, whereby the City Council proclaimed a local emergency regarding January 2023 Storms and ratified the proclamation of a local emergency by the Acting City Manager as the Emergency Services Director.

5. Government Code section 8630, subdivision (c), requires that the City Council terminate a local emergency proclamation “at the earliest possible date that conditions warrant.”

6. The City’s efforts to mobilize local resources, coordinate interagency response, accelerate procurement of vital supplies, and seek reimbursement by the State and Federal governments required a continuance of the January Storms emergency. On March 7, 2023, the City Council approved the continuation of the proclamation of a local emergency regarding the January 2023 Storms The City Council having reviewed the need for continuing the existence of a local emergency and recognizing the requirement under statute to terminate the same at “the earliest possible date that the conditions warrant termination,” now conclude that the current conditions related to the January Storms in the City of El Paso de Robles warrant termination of the local emergency proclaimed pursuant to Resolution No. 23-001.

Options

1. Take no action;

2. Approve the Termination of Local Emergency regarding January Rain, Flood, and Windstorm Events;

3. Amend or modify the resolution as submitted;

4. Provide alternative direction to staff.

Analysis and Conclusion
The proclamation of a local emergency was necessary due to:
 The severe rain, wind, and flooding conditions that occurred on Monday, January 9, 2023 and Tuesday, January 10, 2023;
 The known and unknown damages sustained to public infrastructure and facilities, as well as private businesses and residences;

Page 342 of 362 ends

 The anticipated cost to restore City infrastructure and facilities to pre-storm conditions for the safety and health of the public;
 The ability of the City to maximize reimbursement from state and federal sources for eligible costs incurred for storm response;
 The potential for private property owners and business owners to obtain insurance reimbursements for damages and/or losses; and
 The weather forecast that indicates additional storms may impact the City of Paso Robles within the immediate future.

Recognizing the requirement under statute to terminate the local emergency at “the earliest possible date that the conditions warrant termination,” now conclude that the current conditions related to the January Storms in the City of El Paso de Robles no longer are present and warrant termination of the local emergency proclaimed pursuant to Resolution No. 23-001.

Fiscal Impact
There is no fiscal impact by terminating the local emergency. However, costs associated with the City’s emergency response and infrastructure damage are estimated to be approximately one million dollars. The city is working with local, state, and federal agencies to receive maximum reimbursements for response, mitigation, and recovery costs.

CEQA Determination
The City finds that the action to terminate the local emergency is not a project subject to the California Environmental Quality Act (“CEQA”) because the termination of the local emergency in itself has no potential to result in either a direct, or reasonably foreseeable indirect, physical change in the environment. (State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378.)
Recommendation
Approve Resolution 23-XXX, Termination of Local Emergency regarding January Rain, Flood, and Windstorm Events.

Attachments

1. Resolution 23-XXX – Termination of Local Emergency regarding January Rain, Flood, and Windstorm Events

Page 343 of 362 ends

Attachment 1
RESOLUTION 23-XXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES TERMINATING A LOCAL EMERGENCY REGARDING JANUARY 2023 WINTER STORMS WHEREAS, On January 9, 2023, conditions of extreme peril to the health and safety of persons in the City of Paso Robles were present as a result of severe storms; and WHEREAS, the City Council on January 9, 2023, found that the above described conditions of disaster or extreme peril did warrant and necessitate the proclamation of the existence of a local emergency City-wide; WHEREAS, California Government Code Section 8630, subdivision (c), requires that the City Council terminate a local emergency proclamation “at the earliest possible date that conditions warrant.”; and WHEREAS, The City Council having reviewed the need for continuing the existence of a local emergency and recognizing the requirement under statute to terminate the same at “the earliest possible date that the conditions warrant termination,” now conclude that the current conditions related to the January Storms in the City of El Paso de Robles warrant termination of the local emergency proclaimed pursuant to Resolution No. 23-001.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. Recitals. The foregoing recitals are true and correct and are incorporated herein by this reference.

Section 2. Termination of Local Emergency. Pursuant to Government Code section 8630, subdivision (d), the proclamation of a local emergency adopted by the City Council on January 9, 2023 (Resolution No. 23-001) is hereby terminated in its entirety.

Section 3. Effective Date. This resolution shall take effect from and after the date of its passage and adoption.

Section 4. CEQA. The City finds that the action to terminate the local emergency is not a project subject to the California Environmental Quality Act (“CEQA”) because the termination of the local emergency in itself has no potential to result in either a direct, or reasonably foreseeable indirect, physical change in the environment. (State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378.) APPROVED this 16th day of May, 2023 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Steven W. Martin, Mayor
ATTEST:

Melissa Boyer, City Clerk
Exhibit A: Resolution 23-001 Ratifying the Declaration of Local Emergency

Page 344 of 362 ends

RESOLUTION 22-001

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES PROCLAIMING A LOCAL EMERGENCY REGARDING JANUARY 2023 WINTER STORMS AND

RATIFYING THE PROCLAMATION OF LOCAL EMERGENCY

BY THE ACTING CITY MANAGER AS THE EMERGENCY SERVICE DIRECTOR WHEREAS, conditions of extreme peril to the health and safety of persons in the City of Paso Robles were present as a result of severe storms commencing on or about 9:00 AM on January 9, 2023; and WHEREAS, the City Council does hereby find that the above described conditions of disaster or extreme peril did warrant and necessitate the proclamation of the existence of a local emergency City-wide; WHEREAS, California Government Code Section 8630 and Paso Robles Municipal Code Section

2.24.060(A)(2) empowers the City Manager and City Council to proclaim the existence of a local emergency to protect and preserve public welfare when the City is affected or likely to be affected by a public calamity; and WHEREAS, the Acting City Manager acting as the Emergency Services Director did properly proclaim the existence of a local emergency within the City.

WHEREAS, under Government Code section 8630(b) and Paso Robles Municipal Code, Chapter 2.24, a proclamation of local emergency must be ratified by the City Council within seven (7) days to remain in effect; and
WHEREAS, Government Code section 8630 generally requires the City Council to review the need for continuing the local emergency at least every sixty (60) days allowing the City to maintain its emergency in place until terminated by the City Council; and
WHEREAS, the City Council desires to declare a local emergency and ratify the proclamation of local emergency by the Acting City Manager.

NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of El Paso de Robles resolves as follows:

Section 1. Pursuant to California Government Code section 8630 and Paso Robles Municipal Code section 2.24.060(A), the City Council hereby finds and proclaims and ratifies a local emergency caused by severe storms commencing on or about 9:00 AM on January 9, 2023 in the City, which constitutes an extreme peril of health and safety of persons within the territorial limits of the City.

Section 2. The local emergency shall be deemed to continue to exist until its termination is proclaimed by the City Council.

Section 3. The Acting City Manager, acting as the Director of Emergency Services, is hereby authorized to furnish information, to promulgate orders and regulations necessary to provide for the protection of life and property pursuant to California Government Code section 8634, to enter into agreements and to take all actions necessary to obtain State emergency assistance to implement preventive measures to protect and preserve the residents of the City within the scope of the local emergency hereby declared.

CC Resolution 23-001 Page 1 of 5 Exhibit A

Page 345 of 362 ends

Exhibit A

Page 346 of 362 ends

A PROCLAMATION BY THE DIRECTOR OF EMERGENCY SERVICES OF

THE CITY OF EL PASO DE ROBLES DECLARING THE

EXISTENCE OF A LOCAL EMERGENCY
January 9, 2023
WHEREAS, the Paso Robles Municipal Code Chapter 2.24 empowers the City Manager, acting as the Director of Emergency Services, to proclaim the existence or threatened existence of a local emergency when the City is exposed to an actual or threatened existence of conditions of disaster or of extreme peril to the safety of persons and property within the City and the City Council is not in session; and
WHEREAS, the City Manager, as Emergency Services Director of the City of El Paso de Robles, does hereby find that:

1. Threatened existence of conditions of extreme peril to the health and safety of persons in the City are present as a result of the by severe storms commencing on or about 9:00 a.m. on the 9th day of January 2023.

2. The aforesaid conditions of extreme peril warrant and necessitate the proclamation of the existence of a local emergency.

3. As contemplated in the Emergency Service Act contained in Government Code Section 8550 et seq., including Section 8558(c), a local emergency exists because of the existence of conditions of disaster or of extreme peril to the safety of persons and property within the City caused by the aforesaid conditions which are likely to be beyond the control of the services, personnel and facilities of the City and require the combined forces of other political subdivisions to combat.

4. At the time of this proclamation, the City Council was not in session.

NOW THEREFORE, IT IS HERBY PROCLAIMED effective 3:00 PM on January 9, 2023 that a local emergency now exists throughout said city; and IT IS FURTHER PROCLAIMED AND ORDERED that during the existence of said local emergency, the powers, functions, and duties of the emergency organization of this City shall be those prescribed by state law, ordinances, and resolutions of the City of El Paso de Robles, notwithstanding all otherwise applicable procedures, timelines, and methods of action, and the Emergency Services Director is expressly authorized to take any and all actions in furtherance of emergency powers to address the emergency.

IT IS FURTHER PROCLAIMED AND ORDERED that a copy of this order and regulation shall be posted in and outside City Hall and shall be made available to the news media and the general public.

IT IS FURTHER PROCLAIMED AND ORDERED that the City Manager shall request that the City Council ratify this order and regulation by resolution as soon as practicable.

Exhibit A CC Resolution 23-001 Page 3 of 5 Exhibit A

Page 347 of 362 ends

IT IS FURTHER PROCLAIMED AND ORDERED that said local emergency shall continue to exist until terminated pursuant to a resolution approved by the City Council of the City of El Paso de Robles.

By: __________________________ Chris Huot, Acting City Manager Director of Emergency Services
ATTEST: __________________________ Melissa Boyer, City Clerk Exhibit A CC Resolution 23-001 Page 4 of 5 Exhibit A

Page 348 of 362 ends

Exhibit A CC Resolution 23-001 Page 5 of 5 Exhibit A

Page 349 of 362 ends

Council Agenda Report
From: Jonathan Stornetta, Fire Chief
Subject: Approval of Termination of Local Emergency Regarding March 2023 Storms CEQA Determination: Termination of the local emergency is not a project subject to the California Environmental Quality Act (State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378).

Date: May 16, 2023
Facts

1. On March 1, 2023, under the provisions of Government Code section 8558(b), Governor Newsom proclaimed a State of Emergency due to conditions caused by the recent storms, by reason of their magnitude, and likelihood to extend beyond the control of the services, personnel, equipment, and facilities of any single local government.

2. Th City of Paso Robles and the Central Coast region were significantly impacted by rain, flood, and wind events on Friday, March 10, 2023.

3. As a result of existing and expected impacts of the atmospheric river hitting Paso Robles, on March 13, 2023, the City Council approved Resolution 23-026, whereby the City Council proclaimed a local emergency regarding March 2023 Storms and ratified the proclamation of a local emergency by the City Manager as the Emergency Services Director.

4. Government Code section 8630, subdivision (c), requires that the City Council terminate a local emergency proclamation “at the earliest possible date that conditions warrant.”

5. The City Council having reviewed the need for continuing the existence of a local emergency and recognizing the requirement under statute to terminate the same at “the earliest possible date that the conditions warrant termination,” now conclude that the current conditions related to the March 2023 Storms in the City of El Paso de Robles warrant termination of the local emergency proclaimed pursuant to Resolution 23-026.

Options

1. Take no action;

2. Approve the Termination of Local Emergency regarding March 20223 Storms;

3. Amend or modify the resolution as submitted;

4. Provide alternative direction to staff.

Analysis and Conclusion
The proclamation of a local emergency was necessary due to:
 The severe rain, wind, and flooding conditions that occurred on Thursday, March 10, 2023;  The known and unknown damages sustained to public infrastructure and facilities, as well as private businesses and residences;
 The anticipated cost to restore City infrastructure and facilities to pre-storm conditions for the safety and health of the public;
 The ability of the City to maximize reimbursement from state and federal sources for eligible costs incurred for storm response;

Page 350 of 362 ends

 The potential for private property owners and business owners to obtain insurance reimbursements for damages and/or losses; and
 The weather forecast that indicates additional storms may impact the City of Paso Robles within the immediate future.

Recognizing the requirement under statute to terminate the local emergency at “the earliest possible date that the conditions warrant termination,” now conclude that the current conditions related to the January Storms in the City of El Paso de Robles no longer are present and warrant termination of the local emergency proclaimed pursuant to Resolution 23-026.

Fiscal Impact
There is no fiscal impact by terminating the local emergency. However, cost associated with the City’s emergency response and infrastructure damage is estimated to be approximately $200,000. The City is continuing to work with local, state, and federal agencies to explore reimbursements for response, mitigation, and recovery efforts, but it is unlikely the City will see any reimbursements related to the March storms.

CEQA Determination
The City finds that the action to terminate the local emergency is not a project subject to the California Environmental Quality Act (“CEQA”) because the termination of the local emergency in itself has no potential to result in either a direct, or reasonably foreseeable indirect, physical change in the environment. (State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378.)
Recommendation
Approve Resolution 23-XXX, Termination of Local Emergency the March 2023 Storms Attachments

1. Resolution 23-XXX – Approving the Termination of Local Emergency a. Resolution 23-026 – March 2023 Storms Resolution Declaring Local Emergency

Page 351 of 362 ends

Attachment 1
RESOLUTION 23-XXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES TERMINATING A LOCAL EMERGENCY REGARDING MARCH 2023 WINTER STORMS WHEREAS, On March 10, 2023, conditions of extreme peril to the health and safety of persons in the City of Paso Robles were present as a result of severe storms; and WHEREAS, the City Council on March 10, 2023, found that the above described conditions of disaster or extreme peril did warrant and necessitate the proclamation of the existence of a local emergency City-wide; WHEREAS, California Government Code Section 8630, subdivision (c), requires that the City Council terminate a local emergency proclamation “at the earliest possible date that conditions warrant.”; and WHEREAS, the City Council having reviewed the need for continuing the existence of a local emergency and recognizing the requirement under statute to terminate the same at “the earliest possible date that the conditions warrant termination,” now conclude that the current conditions related to the March 2023 Storms in the City of El Paso de Robles warrant termination of the local emergency proclaimed pursuant to Resolution 23-026.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. Recitals. The foregoing recitals are true and correct and are incorporated herein by this reference.

Section 2. Termination of Local Emergency. Pursuant to Government Code section 8630, subdivision (d), the proclamation of a local emergency adopted by the City Council on March 10, 2023 (Resolution No. 23-001) is hereby terminated in its entirety.

Section 3. Effective Date. This resolution shall take effect from and after the date of its passage and adoption.

Section 4. CEQA. The City finds that the action to terminate the local emergency is not a project subject to the California Environmental Quality Act (“CEQA”) because the termination of the local emergency in itself has no potential to result in either a direct, or reasonably foreseeable indirect, physical change in the environment. (State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378.) APPROVED this 16th day of May, 2023 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Steven W. Martin, Mayor
ATTEST:

Melissa Boyer, City Clerk
Exhibit A: 2023-03-01 - Declaration of Local Emergency - January Storms

Page 352 of 362 ends

RESOLUTION 23-026

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES PROCLAIMING A LOCAL EMERGENCY REGARDING MARCH 2023 WINTER STORMS AND

RATIFYING THE PROCLAMATION OF LOCAL EMERGENCY

BY THE ACTING CITY MANAGER AS THE EMERGENCY SERVICE DIRECTOR WHEREAS, conditions of extreme peril to the health and safety of persons in the City of Paso Robles were present as a result of severe storms commencing on or about 10:00 AM on March 10, 2023; and WHEREAS, the City Council does hereby find that the above described conditions of disaster or extreme peril did warrant and necessitate the proclamation of the existence of a local emergency City-wide; WHEREAS, California Government Code Section 8630 and Paso Robles Municipal Code Section

2.24.060(A)(2) empowers the City Manager and City Council to proclaim the existence of a local emergency to protect and preserve public welfare when the City is affected or likely to be affected by a public calamity; and WHEREAS, the City Manager acting as the Emergency Services Director did properly proclaim the existence of a local emergency within the City.

WHEREAS, under Government Code section 8630(b) and Paso Robles Municipal Code, Chapter 2.24, a proclamation of local emergency must be ratified by the City Council within seven (7) days to remain in effect; and
WHEREAS, Government Code section 8630 generally requires the City Council to review the need for continuing the local emergency at least every sixty (60) days allowing the City to maintain its emergency in place until terminated by the City Council; and
WHEREAS, the City Council desires to declare a local emergency and ratify the proclamation of local emergency by the City Manager.

NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of El Paso de Robles resolves as follows:

Section 1. Pursuant to California Government Code section 8630 and Paso Robles Municipal Code section 2.24.060(A), the City Council hereby finds and proclaims and ratifies a local emergency caused by severe storms commencing on or about 10:00 AM on March 10, 2023 in the City, which constitutes an extreme peril of health and safety of persons within the territorial limits of the City.

Section 2. The local emergency shall be deemed to continue to exist until its termination is proclaimed by the City Council.

Section 3. The City Manager, acting as the Director of Emergency Services, is hereby authorized to furnish information, to promulgate orders and regulations necessary to provide for the protection of life and property pursuant to California Government Code section 8634, to enter into agreements and to take all actions necessary to obtain State emergency assistance to implement preventive measures to protect and preserve the residents of the City within the scope of the local emergency hereby declared.

CC Resolution 23-026 Page 1 of 5 Exhibit A

Page 353 of 362 ends

Exhibit A

Page 354 of 362 ends

A PROCLAMATION BY THE DIRECTOR OF EMERGENCY SERVICES OF

THE CITY OF EL PASO DE ROBLES DECLARING THE

EXISTENCE OF A LOCAL EMERGENCY
March 10, 2023
WHEREAS, the Paso Robles Municipal Code Chapter 2.24 empowers the City Manager, acting as the Director of Emergency Services, to proclaim the existence or threatened existence of a local emergency when the City is exposed to an actual or threatened existence of conditions of disaster or of extreme peril to the safety of persons and property within the City and the City Council is not in session; and
WHEREAS, the City Manager, as Emergency Services Director of the City of El Paso de Robles, does hereby find that:

1. Threatened existence of conditions of extreme peril to the health and safety of persons in the City are present as a result of severe storms commencing on or about 1:00 a.m. on the 10th day of March 2023.

2. The aforesaid conditions of extreme peril warrant and necessitate the proclamation of the existence of a local emergency.

3. As contemplated in the Emergency Service Act contained in Government Code Section 8550 et seq., including Section 8558(c), a local emergency exists because of the existence of conditions of disaster or of extreme peril to the safety of persons and property within the City caused by the aforesaid conditions which are likely to be beyond the control of the services, personnel and facilities of the City and require the combined forces of other political subdivisions to combat.

4. At the time of this proclamation, the City Council was not in session.

NOW THEREFORE, IT IS HERBY PROCLAIMED effective 10:00 AM on March 10, 2023, that a local emergency now exists throughout said city; and IT IS FURTHER PROCLAIMED AND ORDERED that during the existence of said local emergency, the powers, functions, and duties of the emergency organization of this City shall be those prescribed by state law, ordinances, and resolutions of the City of El Paso de Robles, notwithstanding all otherwise applicable procedures, timelines, and methods of action, and the Emergency Services Director is expressly authorized to take any and all actions in furtherance of emergency powers to address the emergency.

IT IS FURTHER PROCLAIMED AND ORDERED that a copy of this order and regulation shall be posted in and outside City Hall and shall be made available to the news media and the general public.

IT IS FURTHER PROCLAIMED AND ORDERED that the City Manager shall request that the City Council ratify this order and regulation by resolution as soon as practicable.

Exhibit A CC Resolution 23-026 Page 3 of 5 Exhibit A

Page 355 of 362 ends

IT IS FURTHER PROCLAIMED AND ORDERED that said local
emergency shall continue to exist until terminated pursuant to a resolution approved by the City Council of the City of El Paso de Robles.

By:

Ty Lewis, City Manager
Director of Emergency
Services
ATTEST:

Melissa Boyer, City Clerk
Exhibit A CC Resolution 23-026 Page 4 of 5 Exhibit A

Page 356 of 362 ends

Exhibit A CC Resolution 23-026 Page 5 of 5 Exhibit A

Page 357 of 362 ends

Council Agenda Report
From: Kirk Gonzalez, Utilities Engineering Manager
Subject: Sole Source Authorization for Advanced Metering Infrastructure CEQA Determination: The City finds that this action is not a project under the California Environmental Quality Act pursuant to State Guidelines Section State CEQA Guidelines, §§ 15060, subd. (b)(2)-(3), 15378.

Date: May 16th, 2022
Facts

1. The City provides water and wastewater service for all homes, businesses, and institutions in the City.

Potable water is delivered to the City’s water customers through approximately 10,935 metered service connections.

2. The City’s water and wastewater charges are based on actual water consumption. Therefore, the City relies on accurate and timely water meter reading information for the billing and collection of approximately $28 million in annual revenue.

3. The City currently uses a third-party vendor to read customer’s water meters. Each meter is read manually each month by vendor employees physically visiting all meter locations throughout the City.

4. Over the past two years, the time between meter readings has varied significantly on account of vendor staffing issues. These delays have caused customer frustration and confusion regarding billings for water and sewer service, have increased staff time to adjust billings and assist customers, and have delayed collection of revenue Water and Wastewater fund revenues.

5. The City’s Capital Improvement Program in the City’s adopted budget includes a project to retrofit existing water meters to advanced metering infrastructure (AMI) beginning this year. AMI is an integrated system consisting of electronic meter registers, a communications network, and data management system that collect water consumption data without requiring manual reading by visiting each meter.

6. The City’s Purchasing Policy Section 5.0, Sole Source Vendors, states that quotation and bid requirements may be waived when the City is best served by a particular vendor. It further states that sole source justification includes, but not limited to, the replacement part for a specific piece of equipment (e.g., a Ford engine for a Ford vehicle); or consistent with current inventory (e.g., all police cruisers being the same make/model).

7. The Water Department has evaluated AMI alternatives that are compatible with the City’s existing water meters and has piloted a cellular AMI solution provided by Badger Meter Company (Badger) for the past three months. Badger provides conventional water meters and AMI solutions.

8. The City has long been standardized on Badger water meters for all meters 2 inches and smaller, which represents a large majority of the City’s active water meters.

9. Badger has developed a product for their existing meters that allows agencies to convert to AMI by replacing only the meter register, forgoing the need to replace the entire meter body. Foregoing replacement of the meter body will reduce the cost of AMI implementation.

10. The Badger Orion AMI system is directly compatible with approximately 96% of the City’s active water meters, is provided by a well-established water meter vendor that has provided reliable service to the City for more than a decade and provides cost-effective equipment for conversion to AMI.

11. Staff is recommending that the City authorize sole source procurement of Badger AMI equipment and services. This authorization will allow staff to:

Page 358 of 362 ends

- Continue preparation for the AMI Retrofit Project and move toward developing bid documents for installation of AMI equipment on the City’s existing water meters. - Establish an agreement and long-term pricing for the selected AMI system. - Begin integration of the AMI data management system with the City’s utility billing system Options

1. Take no action;

2. Authorize sole source procurement from Badger Meter Company for the Orion/Beacon AMI system;

3. Provide alternative direction to staff.

Analysis and Conclusions
The City currently contracts with a third-party vendor for monthly reading of the City’s approximately 10,935 active water meters and requires timely meter readings for customer billing, calculation of customers’ sewer usage, and water demand estimates. Recently there have been extensive delays in meter reading on account of the vendor’s staffing issues. For example, in early 2022, meter readings were significantly delayed for five consecutive months. These delays impacted the City’s water customers and required additional staff time to make necessary adjustments to billings, assist other customers with questions and concerns over variations in billings, and provide re-reads. Additionally, the vendor has indicated that they are not sure how long their business will continue operating.

The Water Department has planned for conversion to AMI metering and has budgeted for conversion of the City’s existing meters to an AMI solution. Benefits of AMI include:
- Improved timeliness and consistency for meter readings. - Customers can access water usage data and customize alerts for high water use thresholds. - Rapid leak detection and notification will reduce water losses and save customers money. - Improved customer service and customer assistance.
- Meter tampering alerts.
- Improved distribution system operation and demand projection. - Identification of backflow events, providing greater protection of public health. - Lower monthly meter reading costs.
- Significantly reduced vehicle trips for meter reading and re-reads.

Approximately 96.4% of the City’s water meters are directly compatible with the Badger Orion AMI system.

Therefore, most of the City’s existing meters can be cost-effectively converted to the Badger Orion AMI system because the meter bodies themselves do not have to be removed, replaced, and reconnected to the City and customers’ service lines.

The Water Department has evaluated other AMI product offerings and identified the Badger Orion cellularbased AMI solution and Beacon data management system as the best approach to meeting the City’s needs.

The Badger Orion system can be installed without requiring replacement of existing meter bodies. The system uses a cellular network that does not require the City to build or maintain a fixed network of communication antennas to transmit data throughout the City. Badger’s user interface is the most evolved and user friendly for both the utility and individual customers. Further, the Badger Orion AMI system is provided by Badger Meter Company, an established manufacturer of water meters that has a proven track record and has reliably served the City for more than a decade The Water Department has also successfully piloted the Badger Orion AMI system on water meters throughout the City over the past three months and, using Badger’s “Beacon” data management system, received timely meter reads during this time. Additionally, during the pilot, several water leaks were identified almost immediately, and the City was able to alert customers of the issues so they could be corrected. Even small leaks that would normally go undetected are easily identified and flagged by the system.

In contrast, with monthly meter reading, high usage is not detected until near the end of the month, when a significant amount of water loss and expense has already occurred.

Page 359 of 362 ends

Staff have received budgetary pricing for implementation of the AMI retrofit project. The pricing includes hardware costs for the AMI encoder registers that will be installed on existing customer meters, costs for implementation of the data management and analytics software (Beacon), and integration with the City’s existing billing system which generates customer bills.

City Council’s authorization for sole source procurement of the Badger AMI system equipment and services will allow City staff to continue progressing the City’s AMI project including working with the AMI provider to establish an agreement and formal pricing for the AMI hardware, software and data management service (Beacon), and integration with the City’s billing system; and move toward developing bid documents for installation of AMI equipment on the City’s existing water meters. The City would also update fees associated with meter installations provided by the City for new development, preventing newly established services from needing to be retrofitted at a later date.

Fiscal Impact
Authorization for sole source procurement of the Badger Orion AMI system does not have any immediate fiscal impact. However, implementation of the AMI system will involve payment of fees for set-up of the data management system (Beacon), integration with the City’s utility billing system, purchase of AMI equipment from Badger Meter Company, and payment of an ongoing service fee. The City’s Capital Improvement Program in the City’s approved budget includes budget for implementation of the AMI project. Additionally, the City is also pursuing a grant opportunity through a State Water and Efficiency Grant Program.

Recommendation (Option 2)
Approve standardizing on the Badger Orion AMI system provided by Badger Meter Company and sole source procurement from Badger for AMI equipment and associated data management services.

Attachments

1. Resolution 23-XXX

Page 360 of 362 ends

Attachment 1
RESOLUTION 23-XXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES

APPROVING STANDARDIZING ON THE BADGER ORION AMI SYSTEM AND SOLE

SOURCE PROCUREMENT FROM BADGER METER COMPANY FOR AMI EQUIPMENT AND

ASSOCIATED DATA MANAGEMENT SERVICES
WHEREAS, the City provides water and wastewater service for nearly all homes, businesses, and institutions in the City; and
WHEREAS, the City currently uses a third-party vendor to read customer’s water meters. The contract meter reader’s staff manually reads meters each month by visiting all meter locations throughout the City; and
WHEREAS, the level of service provided by the City’s third-party vendor for meter reading has recently declined and significant delays have occurred in meter readings for consecutive months; and WHEREAS, the Capital Improvement Program in the City’s adopted budget includes a project to retrofit existing water meters to advanced metering infrastructure (AMI) beginning in 2023; and WHEREAS, the City has evaluated AMI alternatives that are compatible with the City’s existing water meters and has piloted a cellular AMI solution provided by Badger Meter Company (Badger); and WHEREAS, the City has standardized on meters manufactured by Badger for all water meters two inches and smaller; and
WHEREAS, an AMI system provided by Badger is directly compatible with approximately 96% of the City’s active water meters and is a cost-effective alternative for conversion to AMI that meets the City’s needs for conversion to AMI; and
WHEREAS, authorization of sole source procurement of AMI equipment and services will allow the City to continue preparation for the City’s AMI project to retrofit existing manually-read water meters to AMI, which includes establishing an agreement and long-term pricing for the selected AMI system, integration of the AMI data management system with the city’s utilities billing system, and procurement of AMI meter equipment for new meters being installed in the distribution system.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL PASO DE ROBLES DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. All of the above recitals are true and correct and incorporated herein by reference.

Section 2. The Council finds that the standardization on Badger AMI equipment is in the best interest of the City and the community because:
 The Badger Orion system can be installed without requiring replacement of existing meter bodies;  The system uses a cellular network that does not require the City to build or maintain a fixed network of communication antennas to transmit data throughout the City;  Badger’s user interface is the most evolved and user friendly for both the utility and individual customers;
The Badger Orion AMI system is provided by Badger Meter Company, an established manufacturer of water meters that has a proven track record and has reliably served the City for more than a decade.

Page 361 of 362 ends

Attachment 1
Section 3. Based upon all of the facts and evidence in the record, the City Council hereby approves the standardization of advanced metering infrastructure equipment from Badger Meter Company and the sole source procurement of equipment and services from Badger Meter Company for advanced metering infrastructure.

APPROVED this 16th day of May, 2023, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Steven W. Martin, Mayor
ATTEST:

Melissa Boyer, City Clerk

Page 362 of 362 ends
← All documents from this meeting