Cities Index.
Agenda packet, regular meeting

Patterson City Council
April 18, 2023

Document
Agenda packet, regular meeting
Meeting
April 18, 2023
Body
Patterson City Council
Pages
24
Original file
43.7 MB
Text extracted from the city's file for reading and search. Open the original on pattersonca.iqm2.com. That file is the official record.

www.fema.gov
Enclosures (2)
Stanislaus County MJHMP Plan Review Tool, dated November 17, 2022 Status of Participating Jurisdictions, dated November 17, 2022 cc: Victoria LaMar-Haas, Hazard Mitigation Planning Chief, California Governor’s Office of Emergency Services
Jennifer Hogan, State Hazard Mitigation Officer, California Governor’s Office of Emergency Services

8.1.b
Packet Pg. 270 Attachment: MJHMP - FEMA Region IX (Resolution No. 2023-17 Stanislaus County MJHMP Update) Stanislaus County Hazard Mitigation Plan Approvable Pending Adoption Notice November 17, 2022

Page 3 of 3 ends

www.fema.gov
Status of Participating Jurisdictions as of November 17, 2022 Jurisdictions – Adopted and Approved
# Jurisdiction Date of Adoption
1 2
3 4
5 6
7 8
9 10
11 Jurisdictions – Approvable Pending Adoption
# Jurisdiction
1 Stanislaus County
2 Ceres, City of
3 Hughson, City of
4 Modesto, City of
5 Newman, City of
6 Oakdale, City of
7 Patterson, City of
8 Riverbank, City of
9 Turlock, City of
10 Waterford, City of
11 Stanislaus County Office of Education

8.1.b
Packet Pg. 271 Attachment: MJHMP - FEMA Region IX (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND
SAFETY

8.1.c
Packet Pg. 272 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) HEALTH
&SAFETY
CITYofPATTERSON ~ General Plan
HS-2

8.1.c
Packet Pg. 273 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND SAFETY
CITY of PATTERSON ~ General Plan
HS-3
Introduction
The Health and Safety Element identifies potential natural and human-made hazards to Patterson residents, including seismic events, flooding, fires, and the unhealthful effects of noise, and provides policies, programs and standards to protect people and property from such hazards.

Goals and Policies
Geologic Hazards
Goal HS-1 To prevent loss of life, injury, and property damage due to geologic and seismic hazards.

Policies
HS-1.1 Geotechnical reports. The City shall require the preparation of geotechnical reports and impose appropriate mitigation measures to ensure, within the limits of technical and economic feasibility, that new structures are able to withstand the effects of seismic activity, including liquefaction, slope instability, expansive soils or other geologic hazards.

HS-1.2 Seismic resistant utilities. Underground utilities, particularly water and natural gas mains, shall be designed to withstand seismic forces in accordance with state requirements.

Flood Hazard
Goal HS-2 To prevent loss of life, injury, and property damage due to flooding.

Policies
HS-2.1 Flood control management. The City shall prepare and adopt flood management plans and practices aimed at protecting life and property from the harmful effects of flooding. As part of this effort, the City shall establish criteria for:
a. Evaluating whether new development should be located in flood hazard zones;
b. Identifying construction methods or other methods to minimize damage if new development is located in flood
hazard zones, and
c. Maintaining the structural and operational integrity of essential public facilities during flooding.

This symbol denotes a
policy that contributes to
sustainability and/or
sustainable practices.

8.1.c
Packet Pg. 274 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) HEALTH
&SAFETY
CITYofPATTERSON ~ General Plan
HS-4
HS-2.2 Location of essential facilities. The City shall ensure that new essential public facilities are located outside of flood hazard zones whenever feasible, including hospitals and health care facilities, emergency shelters, fire stations, emergency command centers, and emergency communications facilities or shall identify construction methods or other methods to minimize damage if these facilities if located within flood hazard zones.

HS-2.3 Cooperation with others. The City shall establish and maintain cooperative working relationships among public agencies with responsibility for flood protection.

HS-2.4 FIRM Program. The City shall continue to participate in the National Flood Insurance Program. To this end, the City shall ensure that its regulations are in full compliance with standards adopted by the Federal Emergency Management Agency.

HS-2.5 Flood protection for residences. New residential development, including mobile homes, shall be constructed so that the lowest floor is at least 12 inches above the 100-year flood level.

HS-2.6 Flood protection for non-residential development. Non-residential development shall be anchored and flood-proofed to prevent damage from the 100-year flood or, alternatively, elevated to at least 12 inches above the 100-year flood level.

HS-2.7 Compliance. Existing development shall comply with policies HS-

2.2. and HS-2.3 when improvements are made that cost at least 50 percent of the estimated current market value of the structure before the improvements.

HS-2.8 Provision of storm drains. Construction of storm drainage improvements shall be required, as appropriate, to prevent flooding during periods of heavy rainfall.

HS-2.9 Prevention of siltation. The City shall impose appropriate conditions on grading projects performed during the rainy season to ensure that silt is not conveyed to storm drainage systems.

HS-2.10 Flooding impacts of new development. New development with the potential to increase flooding impacts on adjoining or
downstream properties shall be prohibited.

8.1.c
Packet Pg. 275 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND
SAFETY
CITYofPATTERSON ~ General Plan
HS-5
HS-2.11 Priority for flood control improvements. The City’s first priority in preventing risks to life and property resulting from flooding shall be to designate appropriate land uses in areas subject to flooding.

Only when this land use-based approach is not sufficient to reduce hazards to life and property to acceptable levels will the City support the construction of new flood control projects.

HS-2.12 Buildable site. Parcels shall not be created upon which the presence of easements, floodplain, marsh or riparian habitat, or other features would leave insufficient land to build and operate structures. This policy shall not apply to open space lots specifically created for dedication to the City or another appropriate party for habitat protection, flood control, drainage, or wetland maintenance.

HS-2.13 Bridge construction. New and modified bridge structures shall not cause an increase in water surface elevations of the 100-year floodplain exceeding one foot, unless analysis clearly indicates that the physical and/or economic use of upstream or
downstream property will not be adversely affected.

HS-2.14 Runoff control. The City shall require all new urban development projects to incorporate runoff control measures to minimize peak flows of runoff and/or assist in financing or otherwise implementing comprehensive drainage plans. All such control measures shall consider potential affects to adjacent property owners.

HS-2.15 Central Valley Flood Protection Plan. The City shall continue to work to achieve consistency between the General Plan and applicable flood management practices with the provisions of the Central Valley Flood Protection Plan.

HS-2.16 Flood hazard mitigation prior to development. The City shall not approve new development in areas subject to a 100-year flood event, based on Federal Emergency Management Agency
(FEMA) or on other updated mapping acceptable to the City, unless and until the flood hazard has been mitigated, Such mitigation may be accomplished by one, or a combination of, the following: • Compliance with Title 17 of the City’s Municipal Code, Flood Hazard areas.
• Installation of flood control improvements along Del
Puerto Creek and/or Salado Creek.

8.1.c
Packet Pg. 276 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH & SAFETY
CITY of PATTERSON ~ General Plan
HS-6
• Avoidance of flood prone areas.

HS-2.17 Flood hazard mitigation prior to development. The City shall require any development on land subject to a 100- year flood event, based on Federal Emergency Management Agency (FEMA) or on other updated mapping acceptable to the City, to conform to National Flood Insurance Program (NFIP) standards.

HS-2.18 Low Impact Development. New development shall incorporate provisions for low impact development as defined by as
minimizing or eliminating pollutants in storm water through natural processes and maintaining pre-development hydrologic characteristics, such as flow patterns, surface retention, and recharge rates.

Fire Hazards
Goal HS-3 To prevent loss of life, injury, and property damage due to wildland and structural fires, explosions and release of hazardous materials.

Policies
HS-3.1 Water service for fire protection. The City shall require that new development provides all necessary water service, fire hydrants, and roads consistent with Fire Department standards.

HS-3.2 Fire flows. The City shall ensure that adequate water fire-flows are maintained throughout the city and shall regularly monitor fire-flows to ensure adequacy. New development shall comply with the following minimum fire-flow rates:

Development Category Gallons per Minute
Single-Family Residential 1,000
Multi-Family Residential 1,500
Principal Business District 2,500
Industrial/Other Business Districts 3,000 to 6,000
HS-3.3 Inspection program. The Fire Department shall maintain an ongoing fire and life safety inspection program for all public, commercial, and industrial buildings.

8.1.c
Packet Pg. 277 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND SAFETY
CITY of PATTERSON ~ General Plan
HS-7
HS-3.4 Fire protection codes. All new development shall be constructed according to fire safety and structural stability standards contained in the latest adopted California Fire and Building Codes and related regulations.

HS-3.5 On-site suppression. The City shall minimize the dependence of new commercial and industrial developments on City firefighting personnel and equipment by requiring on-site fire suppression systems which include sprinklers and pumps, as deemed
necessary.

HS-3.6 Fire prevention. The City shall require property owners to remove fire hazards, including vegetation, hazardous structures and materials, and debris, as directed by the Fire Department.

HS-3.7 Access for fire protection equipment. The City shall ensure that new development provides for adequate fire equipment access and, where appropriate, includes the use of fire-resistant landscaping and building materials.

HS-3.8 Testing of hazardous areas. In cooperation with the Stanislaus County Health Department, the City shall require testing for contamination in areas suspected as potentially hazardous and shall require that remediation of hazardous areas takes place prior to development.

Emergency Response
Goal HS-4 To ensure that City emergency response procedures are adequate in the event of natural or human-made disasters.

Policies
HS-4.1 Emergency response plan. The City shall maintain, periodically update, and test the effectiveness of its Emergency Response Plan. As part of the periodic update, the City shall review county and state emergency response plans and procedures to ensure coordination with the City’s plan.

HS-4.2 Emergency access routes. The City shall identify emergency access routes and shall ensure that they are kept free of traffic impediments. Emergency access and evacuation routes shall be maintained for areas east and west of the railroad right-of-way.

8.1.c
Packet Pg. 278 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH & SAFETY
CITY of PATTERSON ~ General Plan
HS-8
HS-4.3 Water sources for fire fighting. The City shall identify alternative water sources for firefighting purposes for use during a disaster.

HS-4.4 Siting of emergency facilities. Critical emergency response facilities such as hospitals, fire, police, emergency service facilities, and utilities shall be sited to minimize their exposure to flooding, seismic effects, fire, or explosion, and to ensure the protection of areas on either side of the railroad right-of-way.

HS-4.5 Command center for emergencies. The City shall designate and develop a command center for use during times of emergency.

HS-4.6 Mutual aid. The City shall maintain mutual aid agreements and communications links with surrounding jurisdictions for assistance during times of emergency.

HS-4.7 Secondary access over San Joaquin River. The City shall work with StanCOG and other applicable agencies to establish a secondary emergency access across the San Joaquin River.

Noise
Goal HS-5 To protect city residents from the harmful and undesirable effects of excessive noise.

Policies
HS-5.1 Noise levels resulting from non-transportation sources. New development of noise-sensitive uses shall not be allowed where the noise level due to non-transportation noise sources will exceed the noise level standards of Table HS-1, as measured immediately within the property line of the new development, unless effective noise mitigation measures have been
incorporated into the development design to achieve the standards specified in Table HS-1.

HS-5.2 Noise levels resulting from non-transportation noise sources. Noise levels resulting from non-transportation noise sources shall be mitigated so as not to exceed the noise level standards of Table HS-1 as measured immediately within the property line of lands designated for noise-sensitive uses. This policy does not apply to

8.1.c
Packet Pg. 279 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND SAFETY
CITY of PATTERSON ~ General Plan
HS-9
noise sources associated with agricultural operations on lands zoned for agricultural uses.

Table HS-1: Noise Level Performance Standards
For New Projects Affected By Or Including
Non-Transportation Sources
Noise Level
Descriptor
Daytime
(7 a.m. to 10 p.m.)
Nighttime
(10 p.m. to 7 a.m.)
Hourly Leq, Db 50 45
Maximum level, Db 70 65
Each of the noise levels specified above shall be lowered by five dBA for simple tone noises, noises consisting primarily of speech or music, or for recurring impulsive noises. These noise level standards do not apply to residential units established in conjunction with industrial or commercial uses (e.g., caretaker dwellings).

HS-5.3 Acoustical analysis required. Where proposed non-residential land uses are likely to produce noise levels exceeding the performance standards of Table HS-1 at existing or planned noise-sensitive uses, an acoustical analysis shall be required as part of the environmental review process so that noise mitigation may be included in the project design. (Requirements for the content of an acoustical analysis are identified in Table HS-2.) (Note: For the purposes of these noise policies, transportation noise sources are defined as traffic on public roadways, railroad line operations and aircraft in flight. Control of noise from these sources is preempted by Federal and State regulations. Other noise sources are presumed to be subject to local regulations, such as a noise control ordinance.)

8.1.c
Packet Pg. 280 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH & SAFETY
CITY of PATTERSON ~ General Plan
HS-10
Table HS-2: Requirements For An Acoustical Analysis
An acoustical analysis prepared pursuant to the noise policies of the General Plan shall:
a. Be the responsibility of the applicant.
b. Be prepared by a qualified person experienced in the fields of environmental noise assessment and architectural acoustics. c. Include representative noise level measurements with sufficient sampling periods and locations to adequately describe local conditions and the predominant noise sources.
d. Estimate existing and projected (20 years) noise levels in terms of L~ or CNEL and/or the standards of Table 11-3, and compare those levels to the adopted policies of the Noise Element.
e. Recommend appropriate mitigation to achieve compliance with the adopted policies and standards of the noise section of the General Plan. Where the noise source in question consists of intermittent single events, the report must address the effects of maximum noise levels in sleeping rooms in terms of possible sleep disturbance. f. Estimate noise exposure after the prescribed mitigation measures have been implemented.
g. Describe a post-project assessment program which could be used to evaluate the effectiveness of the proposed mitigation measures.

HS-5.4 Noise standards. The feasibility of proposed projects with respect to existing and future transportation noise levels shall be evaluated by comparison to Figure HS-1.

HS-5.5 Noise sensitive land uses. New development of noise-sensitive land uses shall not be permitted in areas exposed to existing or projected levels of noise from transportation noise sources which exceed the levels specified in Table HS-3, unless the project design includes effective mitigation measures to reduce noise in outdoor activity areas and interior spaces to the levels specified in Table HS-1.

8.1.c
Packet Pg. 281 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND
SAFETY
CITYofPATTERSON ~ General Plan
HS-11
HS-5.6 Transportation noise sources and mitigation. Noise created by new transportation noise sources, including roadway improvement projects, shall be mitigated so as not to exceed the levels specified in Table HS-1 at outdoor activity areas or interior spaces of existing noise-sensitive land uses in either the incorporated or unincorporated areas.

HS-5.7 Acoustical analysis required. Where noise-sensitive land uses are proposed in areas exposed to existing or projected exterior noise levels exceeding the levels specified in Table HS-1 or the performance standards of Table HS-3, an acoustical analysis shall be required as part of the environmental review process so that noise mitigation may be included in the project design.

HS-5.8 Minimize the use of noise barriers. Where noise mitigation measures are required to achieve the standards of Tables HS-1 and HS-3, the emphasis of such measures shall be placed upon site planning and project design. The use of noise barriers shall only be considered a supplemental means of achieving the noise standards after all practical design-related noise mitigation measures have been integrated into the project.

8.1.c
Packet Pg. 282 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH & SAFETY
CITY of PATTERSON ~ General Plan
HS-12
Table HS-3: Noise Level Performance Standards
For New Projects
Affected By Or Including Transportation Sources
Land Use
Outdoor Activity Areas1 Interior Spaces
Ldn/CNEL, DbLdn/CNEL, dbLeq, Db2
Residential 603 45
Transient Lodging 603 45
Hospitals, Nursing Homes 603 45
Theaters, Auditoriums, Music Halls 35
Churches, Meeting Halls 603 40
Office Buildings 603 45
Schools, Libraries, Museums 45
Playgrounds, Neighborhood Parks 70

1. Where the location of outdoor activity areas is unknown, the exterior noise level standard shall be applied to the property line of the receiving land use.

1. As determined for a typical worst-case hour during periods of use.

2. Where it is not possible to reduce noise in outdoor activity areas to 60 Db Ldn/CNEL or less using a practical application of the best available noise reduction measures, an exterior noise level of up to 65 Db Ldn/CNEL may be allowed, provided that available exterior noise level reduction measures have been implemented and interior noise levels are in compliance with this table.

8.1.c
Packet Pg. 283 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND
SAFETY
CITYofPATTERSON ~ General Plan
HS-13
Figure HS-1– Noise Compatibility Guidelines

8.1.c
Packet Pg. 284 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH & SAFETY
CITY of PATTERSON ~ General Plan
HS-14
Crime Prevention
Goal HS-6: To prevent crime and promote the protection of people and property.

Policies
HS-6.1 Neighborhood security training. The Police Services Department shall provide neighborhood security and crime prevention information and training to neighborhood groups and
homeowners’ associations.

HS-6.2 Deterrence through design. The City shall encourage the use of physical site planning as an effective means of preventing crime.

Developers shall design open spaces, parking lots, parks, play areas, and other public spaces so they can be under continuous surveillance by residents. To this end, the Police Department shall participate in the development review process to ensure that crime prevention considerations are incorporated in the design of residential, commercial, industrial, and public facility projects.

HS-6.3 Police staffing. The City shall provide and maintain an adequate level of police equipment and personnel consistent with city growth and development.

8.1.c
Packet Pg. 285 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND SAFETY
CITY of PATTERSON ~ General Plan
HS-15
Hazardous Materials
Goal HS-7: To protect the health and safety of Patterson residents from the harmful effects of the use, transport and disposal of hazardous substances.

Policies
HS-7.1 Coordination. The City shall coordinate1 with the California Highway Patrol, the Stanislaus County Department of
Environmental Health Services, the County Sheriff’s
Department, and all other appropriate local, state and federal agencies in hazardous materials route planning, notifications and incident response, to ensure appropriate first response to hazardous material incidents.

HS-7.2 Avoidance. The City shall seek to avoid and minimize exposure of sensitive land uses to potentially hazardous emissions along truck routes and rail lines which may be used by surface vehicles and rail cars carrying hazardous or toxic substances. These truck routes include Interstate 5, State Highway 33, and Las Palmas Avenue. Rail corridors include the two primary lines running north-south through Patterson.
1 Coordinate. To solicit, consider, and respond to comments from other agencies, organizations, or groups in order to bring common actions, movements, or conditions. Coordinate is used in the context of the general plan to direct an organized approach to addressing inter-jurisdictional issues that are not solely under the purview of the City of Patterson. This does not imply that the City is superior or subordinate to other agencies, organizations, or groups. Rather, it indicates that the City will confer with other agencies, organizations, or groups for the purpose of identifying and potentially implementing mutually-agreeable solutions. It does not commit the City to any specific course of action or interagency relationship. “To coordinate” or “coordination” does not have the same meaning as found in the appellate court decision of California Native Plant Society v. City of Rancho Cordova (2009) 172 Cal. App. 4th 603.

This general plan does not contain fundamental, mandatory, and specific land use policies, standards, objectives of implementation standards similar in character to policies which from the basis of the holding in Families Unafraid to Uphold Rural Etc. County v. Bd. Of Supervisors (1988) 62 Cal. App. 4th 1332. The determination of whether or not an approval or action is consistent with this general plan is guided by the holding in Sequoyah Hills Homeowners v. City of Oakland (1993) 23 Cal.

App. 4th 704.

8.1.c
Packet Pg. 286 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) HEALTH
&SAFETY
CITYofPATTERSON ~ General Plan
HS-16
HS-7.3 Management of hazardous materials. The City shall regulate the storage of hazardous and waste materials consistent with state and federal law. The City shall not permit above ground tanks without considering the potential hazards that would result from the release of stored liquids caused by possible rupture or collapse, and may request applicants to have an emergency response plan.

HS-7.4 Industrial facilities. The City shall work with responsible agencies to ensure that all industrial facilities are constructed and operated in accordance with the most current safety and environmental protection standards.

HS-7.5 Storage. Industries that store and process significant quantities of hazardous or toxic materials shall provide a buffer zone between the installation that houses such substances and the property boundaries of the facility sufficient to protect the public in the event of the release or leak of the materials.

HS-7.6 Remediation. The City shall work with other responsible agencies on efforts to clean up or contain identified soil or water contamination in the city limits.

HS-7.7 Written confirmation of remediation. The City shall require written confirmation from applicable local, regional, state, and federal agencies that known contaminated sites have been deemed remediated to a level appropriate for land uses proposed prior to the City approving site development or provide an approved remediation plan that demonstrates how contamination will be remediated prior to site occupancy. This documentation shall specify the extent of development allowed on the remediated site as well as any special conditions and/or restrictions on future land uses.

8.1.c
Packet Pg. 287 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update)

HEALTH AND
SAFETY
CITYofPATTERSON ~ General Plan
HS-17
Rail Safety
Goal HS-8: To facilitate the safe movement of people, goods and services throughout the General Plan area.

HS-8.1 At-grade railroad crossings and rail corridors. The City shall initiate, and collaborate in, safety and design improvements at existing railroad-at-grade crossings and along rail corridors.

Strategies to be considered include (but are not limited to) the following:
a. Installation of grade separations at crossings where feasible; b. Improvements to warning devices at existing highway-rail crossings;
c. Installation of additional warning signage;
d. Improvements to traffic signaling at intersections adjacent to crossings, such as traffic preemption;
e. Installation of median separation to prevent vehicles from driving around railroad crossing gates;
f. Where soundwalls, landscaping, buildings would be
installed near crossings, maintaining the visibility of warning devices and approaching trains;
g. Prohibition of parking within 100 feet of crossings to improve the visibility of warning devises and approaching trains;
h. Installation of pedestrian-specific warning devices and channelization;
i. Construction of pull-out lanes for buses and vehicles transporting hazardous materials;
j. Installation of vandal-resistant fencing or walls to limit the access of pedestrians onto the right-of-way;
k. Elimination of driveways near crossings;
l. Increased enforcement of traffic laws at crossings;
m. Rail safety awareness to educate the public about the hazards of highway-rail grade crossings;
HS-8.2 Referral to PUC. The City shall refer projects with the potential to adversely impact existing or proposed railroad crossings to the California Public Utilities Commission for recommendations regarding rail safety.

8.1.c
Packet Pg. 288 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-18

Implementation Measures
No. Implementation Measure Policies/
Goals Responsibility
Timeframe
Near
Term
MidTerm Long-Term Ongoing
HS-1

The City shall adopt the most
current editions of the California
Building Code, California Fire
Code, Uniform Plumbing,
Mechanical, and National Electric
Codes.

HS-1.1
HS-2.5
HS-2.6
HS-2.10
HS-3.4
Building
Department
Fire Department

HS-2

The Fire Department shall
endeavor to inspect commercial
and industrial buildings annually
in conjunction with issuance and
renewal of business licenses.

HS-3.3 Fire Department 
HS-3

The City shall maintain,
periodically update, and test the
effectiveness of its Emergency
Response Plan. As part of the
periodic update, the City shall
review county and state emergency
response plans and procedures to
ensure coordination with the
City’s plan.

HS-4.1
City Council
City Manager
Public Works
Department
Police Department
Fire Department

HS-4
The City shall periodically conduct
tests of its emergency response
procedures.

HS-4.1
City Council
City Manager
Police Department
Fire Department

HS-5
The City shall review and revise as
necessary its noise control
ordinance to regulate existing
noise sources.

HS-5.1
HS-5.2
City Council
Community
Development
Department

HS-6
Prior to approval of a noisesensitive use exposed to existing or projected noise exceeding the
standards of the General Plan, an
acoustical analysis shall be
required. The acoustical analysis
shall comply with the
requirements set out in Table HS-2
of the Policy Document.

HS-5.3
City Council
Community
Development
Department

HS-7
The City shall enforce state noise
insulation standards (California
Administrative Code, Title 24) and
Chapter 35 of the Uniform
Building Code (UB C). Title 24
requires that an acoustical analysis
be prepared for all new
developments of multi-family
dwellings, condominiums, hotels
and motels proposed for areas
within the 60 Db Ld], contour of a
major noise source for the purpose
of documenting that an acceptable
interior noise level of 45 Db L~ or
below will be achieved. TJBC
Chapter 35 requires that common
wall and floor/ceiling assemblies
HS-5.4
Community
Development
Department
Building
Department

8.1.c
Packet Pg. 289 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-19

Implementation Measures
No. Implementation Measure Policies/
Goals Responsibility
Timeframe
Near
Term
MidTerm Long-Term Ongoing
within multi-family dwellings
comply with minimum standards
for the transmission of airborne
sound and structure-borne impact
noise.

HS-8
The City shall develop and employ
procedures to monitor compliance
with noise mitigation standards
after projects are completed.

HS-5.5
Community
Development
Department
Building
Department

HS-9
The Police Department shall
continue to provide neighborhood
security and crime prevention
information and training to
neighborhood groups and
homeowner’s associations.

HS-6.2 City Manager
Police Department 
HS-10
The City shall require the
following as a condition of project
approval to mitigate the adverse
noise effects of constructionrelated activities:
• Construction activities shall be
restricted to the hours between
7:00 a.m. and 7:00 p.m.,
Monday through Friday, and
between 9:00 a.m. and 7:00
p.m. on Saturday, with no
construction on Sundays or
federal and state holidays;
minor construction equipment
servicing and maintenance
shall be exempted from this
restriction.
• During construction, mufflers
shall be provided for all heavy
construction equipment and all
stationary noise sources in
accordance with the
manufacturers’
recommendations.
• Stationary noise sources and
staging areas shall be located
as far as is feasible from
existing residences, or
contractors shall be required to
provide additional noisereducing engine enclosures
(with the goal of achieving
approximately 10 dBA of
reduction compared to
uncontrolled engines).
• Air compressors and
pneumatic equipment should
be equipped with mufflers, and
HS-5.2
HS-5.4
Building
Department,
Planning
Department

8.1.c
Packet Pg. 290 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-20

Implementation Measures
No. Implementation Measure Policies/
Goals Responsibility
Timeframe
Near
Term
MidTerm Long-Term Ongoing
impact tools should be
equipped with shrouds or
shields.
• If for construction purposes,
locating stationary
construction equipment near
existing residential uses is
required, an eight-foot-tall
sound rated fence should be
erected between the
equipment and the sensitive
receptor. The fence should be
located as close to the
equipment as is feasible.
• Construction vehicle access
routes shall be designed to
minimize the impact on
existing residences and
occupied hospital facilities.
• A “construction liaison” shall
be designated to ensure
coordination between
construction staff and
neighbors to minimize
disruptions due to
construction noise. Occupants
and property owners of
residences within 400 feet of
construction activity shall be
notified in writing of the
construction schedule and the
contact information for the
construction liaison.
• A qualified acoustical engineer
should be retained during the
construction phase of the
project to determine if the
noise levels generated from
construction equipment at the
project site to adjacent
property lines are within the
standards.

HS-11
Project applicants shall develop
and implement a Soil Sampling and
Analysis Plan to determine the
presence and extent of any residual
herbicides, pesticides, and
fumigants on currently or
historically-farmed land in
agricultural areas that would be
disturbed during construction of
the Proposed Project. The Plan
shall be prepared in consultation
with the Stanislaus County
Department of Environmental
HS-7.2
HS-7.3
HS-7.7
Building
Department,
Planning
Department

8.1.c
Packet Pg. 291 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-21

Implementation Measures
No. Implementation Measure Policies/
Goals Responsibility
Timeframe
Near
Term
MidTerm Long-Term Ongoing
Health Services and the work shall
be conducted by an appropriate
California-licensed professional
and samples sent to a California
Certified laboratory. At a
minimum, the Plan shall document
the areas proposed for sampling,
the procedures for sample
collection, the laboratory analytical
methods to be used, and the
pertinent regulatory threshold
levels for determining proper
excavation, handling, and, if
necessary, treatment or disposal of
any contaminated soils. The Plan
shall be submitted to the City of
Patterson and Stanislaus County
Department of Environmental
Health Services for review and
approval at least 60 days before
construction. Results of the
laboratory testing and
recommended resolutions for
excavation, handling, dust control,
and treatment/disposal of material
found to exceed regulatory
requirements shall be submitted to
the City prior to construction.

HS-12
Noise contours derived from the
acoustical analysis prepared by
Brown Buntin Associates, Inc.,
entitled Noise Element Update
City Of Patterson, Stanislaus
County, California, May, 2010 shall
be incorporated into the General
Plan Noise Element.

HS-5.1
HS-5.4
HS-5.5
HS-5.6
Planning
Department 
HS-13
New development shall be
required to implement (through
installation or the payment of inlieu fees) relevant portions of the March 2010 City of Patterson
General Plan Storm Drainage
Study.

HS-2.1
Public Works
Department
Building
Department,
Planning
Department

Near-Term = Within 5 Years
Mid-Term = Within 10 Years
Long-Term = 10 Years and Beyond

8.1.c
Packet Pg. 292 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY
ofPATTERSON ~ General Plan
HS-22
Figure HS-2 Areas of Known Seismic Risk and Geologic Hazards

8.1.c
Packet Pg. 293 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY
ofPATTERSON ~ General Plan
HS-23
Figure HS-3 Emergency Access Routes

8.1.c
Packet Pg. 294 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-24
Appendix HS-1- Noise
The Noise Environment
There are several potentially significant primary sources of community noise within Patterson.

These sources include traffic on major roadways and highways, railroad operations, and agricultural and industrial activities.

A community noise survey was conducted to document existing background (ambient) noise levels at four representative locations within the City. The monitoring site locations were located in both residential and commercial areas of the City. Noise measurements were conducted concurrently at the sites, beginning at midnight on March 25, 2010. The monitoring sites are shown in Figure HS-4.

Noise measurements were conducted continuously for a 24-hour period using Larson-Davis Laboratories Model 820 sound level analyzers equipped with Bruel & Kjaer (B&K) Type 4176 ½ inch microphones. The equipment was calibrated with a B&K Type 4230 acoustic calibrator to ensure the accuracy of the measurements and complies with applicable standards of the American National Standards Institute (ANSI) for Type 1 sound level meters. Microphones were located on tripods at approximately five feet above the ground.

Site 1 was located at a self storage facility on North 1st Street between M Street and Olive Avenue.

The site is a commercial area with mixed residential uses to the west and agriculture and rural residential uses to the east. The microphone was located approximately 150 feet east of State Route 33 (SR-33) and approximately 230 feet west of North 1st Street. The California Northern Railroad (CFNR) track is located approximately 80 feet to the west, and lies between SR-33 and the site. Measured hourly maximum noise levels ranged from 61-91 dBA during the sample period, and were likely caused by passing vehicles and trains. Background (L90) noise levels ranged from about 50-55 dBA during the morning and afternoon commute hours to about 45-50 dBA during the middle of the afternoon, evening and night time hours. The measured DNL was

62.4 dB.

Site 2 was located at a City water storage facility approximately 475 feet northwest of the intersection of Orange Avenue and Locust Avenue. There are commercial uses located to the west of the site, and agricultural uses to the north, east and south. There are a few existing single-family homes located to the south of the monitoring site. Measured hourly maximum noise levels ranged from 55-86 dBA during the sample period and were likely caused by passing vehicles and trains. Background (L90) noise levels were relatively constant throughout the sample period, and ranged from 53-55 dBA. The predominant background noise source measured at Site 2 was exhaust fans from the Sierra Pacific facility. The measured DNL was 62.1 dB.

Site 3 was located at a City fire station at 1950 Keystone Pacific Parkway. The microphone was located approximately 325 feet east of Park Center Drive and approximately 350 feet south of Keystone Pacific Parkway. The site is surrounded by existing commercial uses and open land.

There are existing single-family homes located approximately 1,500 feet east of the monitoring site. Measured hourly maximum noise levels ranged from 55-80 dBA during the sample period and were likely caused by passing trucks. Background (L90) noise levels ranged from below 40 dBA during the late night and early morning hours to about 47 dBA during the morning commute hours. The measured DNL was 55.4 dB.

8.1.c
Packet Pg. 295 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-25
Site 4 was located in a vacant lot on Peach Blossom Lane between Plumeria Drive and Garden Patch Way. The meter was located in a residential area surrounded by single-family homes.

Measured hourly maximum noise levels ranged from 48-73 dBA during the sample period and were likely caused by passing vehicles. Background (L90) noise levels ranged from below 40 dBA during the late night and early morning hours to about 47 dBA late afternoon and early evening hours. The measured DNL was 50.6 dB.

Stationary Noise Sources
Major existing stationary noise sources within the City of Patterson include the central core commercial/industrial area along SR-33, the CFNR tracks and the CVS Pharmacy and Kohls distribution centers on the west side of town. There are also various smaller sources located within the Study Area.

Central Core Commercial/Industrial Area. This commercial/industrial area represents the area east of SR-33 extending from approximately Las Palmas Avenue to Orange Avenue. This area includes Patterson Vegetable, Sierra Pacific, Trinidad Benham, Traina Foods, George Lowry Petroleum, and other agricultural- and industrial- related facilities. Noise levels generated within this area were measured at multiple short-term locations on March 25-26, 2010, as noted in Figure HS-4.

Table HS-4 documents the measured noise levels and locations of the short-term monitoring sites. Noise levels varied widely throughout the area, with the loudest areas being to the north along Las Palmas Avenue in the vicinity of Patterson Vegetable, as well as in the southern portion along 2nd Street near Trinidad Benham. The closest residential uses are the Las Palmas trailer park to the east. Noise measurements were obtained at two locations within the trailer park (Enrique Way/El Camino Drive and Shirlinda Way/Pasa Felix Drive). Noise levels at these locations ranged from approximately 46-52 dBA.

Table HS-4: Measured Noise Levels (Dba)
Central Core Commercial/Industrial Area
March 25-26, 2010
Location Range (dBA) Primary Source
Enrique Way and El Camino Drive 50-52 Patterson Vegetable Las Palmas Avenue and 1st Street 69-71 Patterson Vegetable 110 E Las Palmas Avenue 73-74 Patterson Vegetable
495 S. 2nd Street 66-67 Trinidad Benham
341 S. 1st Street 60-65 Trinidad Benham
Orange Avenue and Locust Avenue 48-51 Traina Foods
Shirlinda Way and Pasa Felix Drive 46-47 Patterson Vegetable 2nd Street and Las Palmas Avenue 64-67 Patterson Vegetable Salado Avenue and El Circulo Avenue 64-66 Patterson Vegetable Orange Avenue and 1st Street 54-57 Sierra Pacific
261 Orange Avenue 49-52 Sierra Pacific
Source: Brown-Buntin Associates, Inc.

8.1.c
Packet Pg. 296 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-26
CVS Pharmacy Distribution Center. CVS Pharmacy operates a distribution center southwest of the intersection of Keystone Pacific Parkway and Park Center Drive. Noise sources include trucks entering and exiting the facility, rooftop fans, occasional outdoor forklift movements, and back-up warning beepers. Short term noise measurements were obtained at a distance of approximately 500 feet from the east side of the facility as noted in Figure HS-4. Measured noise levels at that site ranged from 42-45 dBA. Long term monitoring Site 3 was also located east of the distribution center, and background noise levels measured for the 24-hour period ranged from approximately 33-48 dBA. Truck traffic along Keystone Pacific Parkway and Rogers Road was observed to represent a greater noise source than activities at the distribution center.

Kohl’s Distribution Center. Kohl’s Department Store operates a distribution center along the north side of Keystone Pacific Parkway, approximately 1,300 feet northeast of the CVS Pharmacy Distribution Center. Noise sources include trucks entering and exiting the facility, occasional fork lift movements, and back-up warning beepers. Short term noise measurements were obtained at a distance of approximately 800 feet from the south side of the facility as noted in Figure HS-4. Facility-related noise levels at that site ranged from approximately 44-46 dBA. As was the case with the CVS Pharmacy distribution center, activities related to the Kohl’s facility were often inaudible above other ambient noise sources, namely roadway vehicle traffic. Truck traffic along Keystone Pacific Parkway and Rogers Road was observed to represent a greater noise source than activities at the distribution center.

Various Commercial/Industrial-related Industries. Observations on March 25, 2010 indicated that there are a number of commercial/industrial-related uses located north of Las Palmas Avenue generally between North 1st Street and SR-33. There are existing residential uses along the east side of North 1st Street in close proximity. Noise levels were measured in front of a residence along North 1st Street at a distance of approximately 60 feet from Peck & Hiller Concrete, and noise levels ranged from approximately 53-61 dBA. Noise sources included welding, cutting, and grinding activities, and truck movements. Additionally, noise measurements were obtained near Designed Mobile Systems, a manufacturer of modular buildings, located west of SR-33 and north of Poppy Avenue. Noise levels were obtained at a nearby residence at 349 Poppy Avenue, and were measured to be in the range of 49-51 dBA.

Noise sources included forklift movements and back-up warning beepers. Short-term noise monitoring sites are noted in Figure HS-4.

Roadways
Automobile traffic on roadways is one of the primary sources of noise within the Study Area.

The eastern portion of the Study Area is most affected by noise generated by State Route 33, with the existing baseline ranging from 67-69 dB. Additional roadways within the eastern portion of the Study Area which generate significant levels of noise consist of Walnut, Sycamore, and Eucalyptus Avenues; however, these roadways do not generate baseline noise levels in excess of 56 dB.

Within the western portion of the Study Area, a substantial amount of vehicular noise is generated by Interstate-5. Approximately 25,000 vehicles per day travel the I-5 corridor through the Study Area2
, with approximately 25 percent of these vehicles classified as heavy-duty or lighter trucks3
. Additional roadways within the western portion of the Study Area expected to 2 TJKM Transportation Consultants Traffic Study for the City of Patterson General Plan, 2010 3 State of California Department of Transportation, 2006 Annual Average Daily Truck Traffic on the California State Highway System

8.1.c
Packet Pg. 297 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-27
generate moderate noise levels are Sperry Avenue, Baldwin Road, and Ward Avenue. These roads are rural or transitional connector streets that may have occasionally fast-moving traffic, but are not heavily-traveled at night, causing only moderate levels of noise during the day. It is estimated that noise levels beyond about 65 feet of the centerline of Sperry Avenue are below 60 dBA.

The Federal Highway Administration (FHWA) Highway Traffic Noise Prediction Model (FHWA-RD-77-108) was used to develop DNL contours for I-5, SR-33, and major local roadways. The FHWA Model is an analytical method favored by most state and local agencies, including Caltrans, for highway traffic noise prediction. The FHWA Model is based upon reference energy emission levels for automobiles, medium trucks (2 axles) and heavy trucks (3 or more axles), with consideration given to vehicle volume, speed, roadway configuration, distance to the receiver, and the acoustical characteristics of the site. The FHWA Model was developed to predict hourly Leq values for free-flowing traffic conditions, and is generally considered to be accurate to within ±1.5 dB. To determine DNL values, it is necessary to estimate the day/night distribution of traffic so that an hourly equivalent traffic volume may be calculated. The FHWA Model assumes a clear view of traffic with no shielding at the receiver location.

Average Daily Traffic (ADT) volumes and speeds used for noise modeling were provided by TJKM Transportation Consultants, the project traffic engineers. The day/night distribution of traffic was estimated by BBA based upon studies along similar roadways. The percentage of trucks on I-5 and SR-33 were obtained from Caltrans. The percentage of trucks on major local streets was estimated by BBA based upon studies along similar roadways. It was assumed that Rogers Road north of Sperry Avenue is a truck route with higher percentages of trucks than other major local streets. Appendix 5.8 summarizes the noise modeling assumptions used to calculate traffic noise exposure for existing conditions along I-5, SR-33 and major local streets.

Table HS-5 summarizes calculated noise exposure at typical building setbacks and the distances to the DNL 60 and 65 dB contours for existing traffic conditions. Figure HS-5 shows the roadways where distances to DNL contours were calculated for existing traffic conditions. The streets are color coded to indicate the approximate distances to the 60 dB DNL contours. Traffic noise exposure information is generalized for flat terrain and the absence of acoustical shielding or reflections that may be caused by site-specific conditions.

8.1.c
Packet Pg. 298 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-28
Table HS-5: Generalized Traffic Noise Exposure, 2010
Roadway Segment
DNL @ Typical
Setback, dB1
Distance, Feet2
60 dB DNL 65 dB DNL
I-5 n/o Sperry Ave. 73.4 1564 726
s/o Sperry Ave. 74.0 1705 792
SR-33
w/o Baldwin Rd. 65.4 172 80
e/o Baldwin Rd. 63.3 125 58
n/o Zacharias Rd. 62.1 104 48
s/o Zacharias Rd. 62.5 110 51
n/o Las Palmas Ave. 62.1 103 48
s/o Las Palmas Ave. 63.7 132 61
n/o Sperry Ave. 63.6 131 61
s/o Sperry Ave. 64.8 156 73
Rogers Rd.
s/o SR-33 52.6 24 11
n/o Sperry Ave. 63.2 122 57
s/o Sperry Ave. --- --- ---
Sperry Ave.
w/o Rogers Rd. 62.0 102 47
e/o Rogers Rd. 61.2 90 42
w/o Baldwin Rd. 61.0 88 41
e/o Baldwin Rd. 60.7 83 39
w/o Ward Ave. 61.2 90 42
e/o Ward Ave. 61.4 93 43
w/o SR-33 59.4 69 32
e/o SR-33 54.8 34 16
Baldwin Rd.
n/o Sperry Ave. 56.2 42 19
s/o Sperry Ave. 52.3 23 11
s/o SR-33 49.3 15 7
Ward Ave. n/o Sperry Ave. 58.4 58 27
s/o Sperry Ave. 56.2 42 20
Zacharias Rd. w/o SR-33 50.0 16 7
e/o SR-33 --- --- ---
Eucalyptus Ave. e/o SR-33 48.1 12 6
Las Palmas Ave
w/o SR-33 59.5 69 32
e/o SR-33 62.7 113 53
w/o Poplar Ave. 63.6 130 60
e/o Poplar Ave. 63.6 130 61
Sycamore Ave. n/o Las Palmas Ave. 54.3 31 14
s/o Las Palmas Ave. 56.3 42 20
Poplar Ave. n/o Las Palmas Ave. 49.1 14 7
W. Main Ave. n/o Las Palmas Ave. 61.3 91 42
s/o Las Palmas Ave. 59.9 73 34
Source: Brown-Buntin Associates, Inc.

Notes:

1. Assumed to be 75 feet from the center of all roadways except I-5 where a setback of 200 feet was assumed. Calculations are generalized and do not take into consideration sound walls or other site-specific conditions.

2. From the center of the roadway.

8.1.c
Packet Pg. 299 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY
ofPATTERSON ~ General Plan
HS-29
Figure HS-4: Stationary Source Monitoring Sites

8.1.c
Packet Pg. 300 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-30
Railroads
The California Northern Railroad (CFNR) currently operates freight trains over the Westside Branch of the Union Pacific Railroad (UPRR) through Patterson between Tracy and Los Banos.

According to the Federal Railroad Administration rail crossing inventory (01/01/96), an average of six trains per day pass through Patterson. It should be noted that this figure includes switching movements at local industries, and that, based upon field observations, this may be a high estimate for current operations over the line. Freight trains may occur at any time during the day or night. The current maximum train speed through Patterson is 25 mph.

There are approximately 20 public or private roadway grade crossings within the Study Area.

Train engineers are required to sound the warning horn when approaching within approximately 1,000 feet of a grade crossing. Train noise levels are therefore higher at locations near grade crossings. Due the number of grade crossings within the Study Area, warning horns are used frequently as trains pass through Patterson.

Noise levels produced by a northbound freight train with two locomotives and 15 cars were recorded by Brown-Buntin Associates, Inc. (BBA) near the M Street grade crossing on March 25, 2010. At a distance of 100 feet from the track, the measured maximum (Lmax) and Sound Exposure Level (SEL) values were 103.3 and 109.8 dBA, respectively. The SEL is a measure of total sound energy produced by a noise event, normalized to a reference duration of one second. The SEL is not actually heard but is the noise metric used for the calculation of cumulative noise exposure as defined by the DNL. Noise levels produced by passing trains are variable, depending upon speed, length of train, condition of equipment and tracks, perceived safety conflicts of individual train crews and other variables.

Railroad noise exposure within the City of Patterson was calculated based upon the abovedescribed operations data and noise level data for freight train movements recorded by BBA for numerous studies along the UPRR and other railroads in the Central Valley. At a distance of 100 feet from the center of the track, typical freight train pass-bys near a grade crossing have been shown to produce average SEL values of 106.3 dBA. At distances greater than 1,000 feet from a grade crossing, typical freight train pass-bys have been shown to produce average SEL values of 102.1 dBA at 100 feet from the tracks.

It was assumed for the calculations that freight train operations may occur at any time of the day or night. Within 1,000 feet of a grade crossing, the calculated distance to the 60 dB DNL contour for current railroad activity is 575 feet from the center of the tracks. At distances greater than 1,000 feet from a grade crossing, the calculated distance to the 60 dB DNL contour is 288 feet from the center of the tracks. Calculated distances are generalized and do not take into consideration site-specific conditions such as acoustic shielding or reflections caused by nearby buildings.

Aircraft Noise
The Patterson Airport and former Crow’s Landing Airfield Facility (CLAF) are located within or affecting the Study Area. Only the Patterson Airport is still active. The Patterson Airport is a private airport consisting of a single 2,500 foot-long runway. According to FAA records, there are 12 aircraft based at the airport and an average of 33 aircraft operations per day. However, no aircraft operations were observed during field studies and aircraft were not observed on the airfield. If aircraft operations do occur, they are sporadic and do not generate significant noise exposure as defined by the CNEL noise metric. However, such operations would be distinctly audible in the vicinity of the airport.

8.1.c
Packet Pg. 301 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-31
Crows Landing Airfield is currently not in use. However, Stanislaus County has proposed that it be reopened as a general aviation airport as part of the Stanislaus County public airport system.

According to the January 2009 draft of the Crows Landing Airport Land Use Compatibility Plan (ALUCP), the airport would reopen with a single 5,300 foot-long runway with approximately 4,000 annual aircraft operations. In the “ultimate” configuration (20 years+), the airfield would have two parallel runways 6,300 feet long and 200,000 annual operations. Operations would be mostly single and twin engine propeller or turboprop aircraft and helicopters, with approximately 10% business jet operations. The airport design aircraft for the ultimate development of the airport is the Gulfstream III business jet.

Noise-Sensitive Land Uses
Noise-sensitive land uses are generally considered to include those uses that would result in noise exposure that could cause health-related risks to individuals. Places where quiet is essential are also considered noise-sensitive uses. Residential dwellings are of primary concern because of the potential for increased and prolonged exposure of individuals to both interior and exterior noise levels. Other land uses such as parks, historic sites, cemeteries, and recreation areas are also considered sensitive to increases in exterior noise levels. School classrooms, places of assembly, hotels, libraries, and other places where low interior noise levels are essential are also considered noise-sensitive land uses.

8.1.c
Packet Pg. 302 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-32
Table HS-6: Generalized 2030 Traffic Noise Exposure
Roadway Segment DNL @ Typical Setback,
dB1
I-5 n/o Sperry Ave. 75.7
s/o Sperry Ave. 76.2
SR-33
w/o Baldwin Rd. 68.0
e/o Baldwin Rd. 65.4
n/o Zacharias Rd. 65.7
s/o Zacharias Rd. 67.5
n/o Las Palmas Ave. 66.9
s/o Las Palmas Ave. 67.3
n/o Sperry Ave. 66.8
s/o Sperry Ave. 69.8
Rogers Rd.
s/o SR-33 61.8
n/o Sperry Ave. 69.1
s/o Sperry Ave. 61.4
Sperry Ave.
w/o Rogers Rd. 66.8
e/o Rogers Rd. 67.1
w/o Baldwin Rd. 68.0
e/o Baldwin Rd. 67.9
w/o Ward Ave. 66.3
e/o Ward Ave. 65.5
w/o SR-33 63.2
e/o SR-33 60.4
Baldwin Rd.
n/o Sperry Ave. 63.6
s/o Sperry Ave. 63.5
s/o SR-33 59.8
Ward Ave. n/o Sperry Ave. 64.4
s/o Sperry Ave. 62.2
Zacharias Rd. w/o SR-33 64.8
e/o SR-33 62.9
Eucalyptus Ave. e/o SR-33 60.3
Las Palmas Ave
w/o SR-33 62.6
e/o SR-33 65.5
w/o Poplar Ave. 65.1
e/o Poplar Ave. 66.3
Sycamore Ave. n/o Las Palmas Ave. 63.7
s/o Las Palmas Ave. 63.9
Poplar Ave. n/o Las Palmas Ave. 60.6
W. Main Ave. w/o Carpenter Ave. 64.6
W. Main Ave. e/o Carpenter Ave. 64.2
Source: Brown-Buntin Associates, Inc.

Notes:

1. Assumed to be 75 feet from the center of all roadways except I-5 where a setback of 200 feet was assumed.

2. Calculations are generalized and do not take into
consideration sound walls or other site-specific conditions.

8.1.c
Packet Pg. 303 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY of PATTERSON ~ General Plan
HS-33
Table HS-7: Generalized Buildout Traffic Noise Exposure Roadway Segment DNL @ Typical Setback, dB1
I-5 n/o Sperry Ave. 77.9
I-5 s/o Sperry Ave. 78.2
Rogers Rd. s/o Zacharias 71.5
Sperry Ave. e/o Rogers Rd. 68.0
Baldwin Rd. n/o Sperry Ave. 63.4
Sperry Ave. e/o Ward Ave. 64.7
Ward Ave. n/o Las Palmas Ave. 63.0
Zacharias Rd. w/o SR-33 68.1
SR-33 n/o Zacharias Rd. 67.8
SR-33 s/o Walnut Ave. 68.8
Ward Ave. n/o Marshall Rd. 65.7
SR-33 s/o Sperry Ave. 68.1
Las Palmas Ave. w/o Sycamore Ave. 66.4
Main St. e/o Carpenter Rd. 65.5
Source: Brown-Buntin Associates, Inc.

Notes:

1. Assumed to be 75 feet from the center of all roadways except I5 where a setback of 200 feet was assumed.

2. Calculations are generalized and do not take into
consideration sound walls or other site-specific conditions.

8.1.c
Packet Pg. 304 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY
ofPATTERSON ~ General Plan
HS-34
Figure HS-5: Distance to 60 dB DNL Contour for the 20-Year Timeframe

8.1.c
Packet Pg. 305 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) CITY
ofPATTERSON ~ General Plan
HS-35
Figure HS-6: Future 60 dB DNL Contour from Rail Traffic

8.1.c
Packet Pg. 306 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 1 1 CITY OF PATTERSON

1.1 Purpose
This Annex summarizes the hazard mitigation elements specific to the City of Patterson. This Annex supplements the Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan (MJHMP); therefore, the Annex is not a stand-alone plan but intended to supplement the hazard information provided in the Base Plan document. All other sections of the Stanislaus County MJHMP, or Base Plan, including the sections on the planning process, countywide risk assessment, and procedural requirements related to plan implementation and maintenance apply to the City of Patterson. This Annex provides additional information specific to the City of Patterson, including details on the City’s profile, planning process, risk assessment, and mitigation strategy for the community.

1.2 Community Profile

1.2.1 Mitigation Planning History and 2021-2022 Process This Annex was created during the development of the 2022 Stanislaus County MJHMP update. The City of Patterson did not participate in Stanislaus County’s 2017 Local Hazard Mitigation Plan (LHMP) process.

The City of Patterson also did not participate in a 2010-2011 Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) process with the County, which was approved by Stanislaus County on May 4, 2011. The City was not listed as a participating jurisdiction based on a letter from FEMA Region IX dated July 31, 2012.

Therefore, the City did not include or report on progress of any of the mitigation actions from a previous version of the MJHMP (a requirement only for plan updatres following the release of FEMA’s October 1, 2011 Local Mitigation Plan Review Guide). During the development of the 2022 Stanislaus County MJHMP update, this Annex is prepared to effectively represent a new and comprehensive plan for Patterson based on current development, demographics, and mitigation capabilities that addresses the City’s current hazards and vulnerabilities.

During the current update process, the City of Patterson followed the planning process detailed in Chapter 3 of the Base Plan. This planning process consisted of participation in the Hazard Mitigation Planning Committee (HMPC) and the formation of a smaller internal planning team referred to as the City’s Local Planning Committee (LPT). The LPT was organized to support the broader planning process, coordinate with the City departmental staff, and develop customized mitigation actions and projects specific to the City of Patterson. The City’s LPT is also responsible for the update, implementation, and maintenance of the plan. LPT members are listed in Appendix A.

1.2.2 Geography and Climate
Patterson lies in the heart of an agricultural region in the western San Joaquin Valley, about 15 miles southwest of the City of Modesto in Stanislaus County. The foothills of the Diablo Range provide a scenic backdrop to the west, and on clear days, the Sierra Nevada mountain range is visible to the east (City of Patterson 2010). Although the pace of development in Patterson has changed greatly in recent years, residents are mindful of protecting its small-town character and remembering its agricultural heritage: the self-proclaimed “Apricot Capital of the World.” The City is located 27 miles southeast of the City of Tracy, 17 miles southwest of Modesto, and 78 miles southeast of Oakland and is part of the Modesto Metropolitan Statistical Area. The San Joaquin River is located three miles to the east of the City and Interstate 5 is located to the west. At the base of the Diablo Range, the City is also the gateway along State Route (SR) 130 into Del Puerto Canyon.

The City receives an average annual precipitation of 12.21 inches and receives most of its precipitation from November through March (WRCC 2022). The City experiences its average monthly highest temperature in July (94.3 °F), and then its monthly lowest temperature in January (53.8 °F). Similar to the rest of Stanislaus County, the City of Patterson has a mild Mediterranean climate.

The City derives much of its economic vitality from agriculture, food processing, and distribution. It is also home to a rapidly expanding business park adjacent to Interstate 5. The City’s street layout features a circular format in the central district surrounded by radiating spokes. Patterson is also noted for its

8.1.c
Packet Pg. 307 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 2 numerous trees, especially its palm-lined thoroughfares. Figure 1-1 below shows the city limits and sphere of influence (SOI) boundary for the City of Patterson. The city limits, or the area where the City has authority to make land use decisions, is the City’s planning area and consists of 4,224 acres, or 6.6 square miles.

Figure 1-1 City of Patterson

1.2.3 History
In 1908 Thomas W. Patterson envisioned a land west of the San Joaquin River filled with irrigated farms that could be settled by families and platted the town in 1909. The town envisioned by Mr. Patterson was modeled after Washington D.C., with streets radiating outward from a central “hub” that served as the center of commerce and local government. The first buildings were the Patterson Ranch Company offices and the Del Puerto Hotel. The lots outside the town were divided into five-, ten-, and twenty-acre plots.

8.1.c
Packet Pg. 308 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 3 In December 1919, Patterson voted to become an incorporated city, and in the intervening years, much of Mr. Patterson’s vision became a reality. The first Planning Commission was formed in 1949 and the City created a Zoning Ordinance and Map in 1955. Today, the City supports a number of attractive residential neighborhoods with a variety of housing types, parks and schools. Shopping opportunities have been expanded to serve the day-to-day needs of Patterson residents. A vibrant and successful business park has been established that provides more and better-paying jobs. And the City boasts a wide range of community amenities that include a community swimming pool, a regional sports park, a senior center and an award-winning City Hall.

In 2009 the City faced new challenges related to the downturn in the economy related to the housing market crisis. During this time, home values plummeted and foreclosures were on the rise. While much of the City of Patterson has recovered from the impacts of the past downturn in the economy, it continues to grow and focus on meeting the needs of a growing community and balancing competing interests through the provision of housing and jobs, with the protection of the agricultural economy, and the conservation of scarce water resources.

1.2.4 Economy
The City of Patterson derives much of its economic vitality from agriculture, food processing, and distribution. It is also home to a rapidly expanding business park adjacent to I-5.According to Patterson’s 2010 General Plan, which covers two planning timeframes for the City – 20 years and 40 years into the future, Patterson, along with the other towns of in western Stanislaus County, has traditionally provided housing and support services for the surrounding agricultural operations that dominate the regional economy (City of Paterson 2010). However, that traditional role is changing. According to data published by the California Department of Finance (DOF), Patterson ranked third among the fastest-growing cities in the California in 2006, based on the percentage of population increase from the previous year. This growth is somewhat based on the increasing housing costs in the eastern San Francisco Bay area prompting residents to seek more affordable housing in the outlying communities. Although the additional development has brought much-needed housing, expanded opportunities for retail and job opportunities have not kept pace.

Estimates of select economic characteristics for the City of Patterson are shown in Table 1-1.

Table 1-1 City of Patterson Economic Characteristics, 2015-2019 Characteristic City of Patterson
Families below Poverty Level (%) 11.1%
All People below Poverty Level (%) 12.1%
Median Family Income $70,306
Median Household Income $69,233
Per Capita Income $23,347
Population in Labor Force 64.3%
Population Employed* 58.3%
Unemployment Rate** 8.9%
Source: U.S. Census Bureau, California Department of Finance, 2015-2019 American Community Survey (ACS), 5-year estimates, www.census.gov/
*Excludes armed forces. **Does not reflect unemployment numbers due to COVID-19 Pandemic The most common industry within a five-mile radius of Patterson is retail trade. Educational services, and health care and social assistance, and transportation and warehousing, and utilities are the other four major industries. The tables below show the labor force breakdown by occupations and industry based on estimates from the 2015-2019 five-year American Community Survey (ACS).

Table 1-2 City of Patterson Employment by Industry, 2015-2019 Occupation # Employed % Employed
Retail trade 2,087 21.9%
Educational services, and health care and social assistance 1,224 12.9% Transportation and warehousing, and utilities 1,130 11.9%

8.1.c
Packet Pg. 309 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 4 Occupation # Employed % Employed
Construction 1,106 11.6%
Manufacturing 800 8.4%
Arts, entertainment, and recreation, and accommodation and food services
742 7.8%
Agriculture, forestry, fishing and hunting, and mining 587 6.2% Wholesale trade 472 5.0%
Other services, except public administration 461 4.8%
Professional, scientific, and management, and administrative and waste management services
380 4.0%
Public administration 257 2.7%
Information 143 1.5%
Finance and insurance, and real estate and rental and leasing 124 1.3% Total 9,513 100%
Source: U.S. Census Bureau, California Department of Finance, 2015-2019 American Community Survey (ACS), 5-year estimates, www.census.gov/
*Excludes armed forces
Table 1-3 City of Patterson Employment by Occupation, 2015-2019 Occupation # Employed % Employed
Management, business, science, and arts occupations 1,646 17.30% Service occupations 1,370 14.40%
Sales and office occupations 2,673 28.10%
Natural resources, construction, and maintenance occupations 1,560 16.40% Production, transportation, and material moving occupations 2,274 23.90% Total 9,513 100%
Source: U.S. Census Bureau, California Department of Finance, 2015-2019 American Community Survey (ACS), 5-year estimates, www.census.gov/
*Excludes armed forces

1.2.5 Population
In May 2021, the State DOF released population data for the state demographic report, According to the report the City of Patterson has a population of 23,304 persons as of January 1, 2021, and gained 154 residents from the previous year. Select demographic and social characteristics for the City of Patterson from the 2015-2019 ACS and the California DOF, are shown in Table 1-4.

Table 1-4 City of Patterson Demographic and Social Characteristics, 2015-2019 Characteristic City of Patterson
Gender/Age
Male 52.0%
Female 48.0%
Median age (years) 31.1
Under 5 years 9.5%
Under 18 years 29.6%
65 years and over 9.2%
Race/Ethnicity
White 20.6%
Asian 6.6%
Black or African American 6.1%
American Indian/Alaska Native 0%

8.1.c
Packet Pg. 310 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 5 Characteristic City of Patterson
Hispanic or Latino (of any race) 62.9%
Native Hawaiian and Other Pacific
Islander

2.0%
Some other race 0%
Two or more races 1.8%
Education*
% High school graduate or higher 73.6%
% with Bachelor’s Degree or Higher 10.3%
Social Vulnerability
% with Disability 10.4%
% Language other than English spoken at
home
57%
% Speak English less than "Very Well" 21%
% of households with a computer 79.7%
% of households with an Internet
subscription

75.7%
% of households with no vehicle available 4.5%
Source: U.S. Census Bureau, California Department of Finance, 2015-2019 American Community Survey (ACS), 5-year estimates, www.census.gov/
* Population 25 years and over
The following table with information from the ACS 5-year estimates (2015-2019) is related to housing occupancy in the City of Patterson.

Table 1-5 City of Patterson Housing Occupancy and Units, 2015-2019 Housing Characteristic Estimate Percentage
Housing Occupancy
Total Housing Units 6,354 100%
Units Occupied 5,958 93.8%
Vacant 396 6.2%
Housing Units
1-unit detached 5,581 87.8%
1-unit attached 280 4.4%
2 units 98 1.5%
3 or 4 units 0 0%
5-9 units 117 1.8%
10-19 units 39 0.6%
20 or more units 89 1.4%
Mobile Home 150 2.4%
Boat, RV, van etc. 0 0%
Housing Tenure
Owner Occupied 3,648 61.2%
Renter Occupied 2,310 38.8%
Source: U.S. Census Bureau, California Department of Finance, 2015-2019 American Community Survey (ACS), 5-year estimates, www.census.gov/

1.2.6 Disadvantaged Communities
The majority of the City falls within two census tracts, one census tract of which has a higher housing burden (6099003530`). Based on information from the California Office of Environmental Health Hazard Assessment (OEHHA) CalEnviroScreen tool, approximately 18% of the people residing with this census tract are housing burdened low income households. Housing-burdened low-income households are

8.1.c
Packet Pg. 311 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 6 households that are both low income and highly burdened by housing costs. California has very high housing costs relative to the rest of the country, which can make it hard for households to afford housing ("CalEnviroScreen 4.0" 2021). Households with lower incomes may spend a larger proportion of their income on housing and may suffer from housing-inducted poverty ("CalEnviroScreen 4.0" 2021). In other words, there are approximately 1,365 housing units in the tract and about 675 of them are considered low income and 245 are considered housing burdened.

The OEHHA CalEnviroScreen tool applies a formula to generate a combined ranking score that considers 21 indicators for each census tract that cover pollution indicators, such as diesel emissions and concentrations of toxic clean-up sites and population indicators, such as poverty and unemployment rates.

The census tracts with CalEnviroScreen rankings between 75 and 100 percent (i.e., a combined score in the top 25 percent of all census tracts in the State) are considered to be disadvantaged communities (DACs). The census tract in the City of Patterson with a higher housing burden has a CalEnviroScreen ranking of 54, meaning the percent housing burdened is higher than 54% of the rest of California. The City can use this information to conduct targeted outreach and engage community members to consider what other hazards and mitigation strategies or programs should be considered to meet community needs. The City can also engage these communities to proactively prioritize hazard mitigation projects that benefit disadvantaged communities.

1.2.7 Development Trends
The City’s General Plan was adopted in 2010 and addressed the previous decade of growth in the Central Valley that resulted from residential development demand from 1998 to 2006 and the expansion of the local and regional economies (City of Patterson 2010). According to the City’s 2009-2014 Housing Element of the five communities nearest to the City, Patterson has been the fastest growing since 2000 and had an estimated 43 percent growth rate from 2000 to 2010. From 2010 through 2020, the City’s population growth slowed and averaged an estimated 11.8 percent growth. Major development projects within the City since 2003 consisted of the Local Agency Formation Commission (LAFCo) approved expansion of the City’s SOI to accommodate the West Patterson Business Park Master Development Plan and the subsequent annexation of the plan area, including the Villa del Lago highway commercial center. Other subsequent development projects included the Villages of Patterson Apartment Project, which includes the Stonegate Villages Apartments that are now complete and the future phases still under building permit status review that are part of a 692-acre master plan development. Other business and commercial developments approved in the past decade included the Keystone Pacific Business Park and the Westridge Business Park. Figure 1-2 illustrates the land uses for the City of Patterson.

8.1.c
Packet Pg. 312 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 7 Figure 1-2 City of Patterson General Plan (2010) – Land Use Diagram

8.1.c
Packet Pg. 313 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 8 Moreover, Table 1-6 below provides a summary of the General Plan “holding capacity”, which is the number of dwelling units, commercial and industrial floor space that can be accommodated based on the amount of land designated for these uses.

Table 1-6 City of Patterson General Plan, Development Holding Capacity Attributes Total At Buildout
Dwelling Units 22,151
Population 66,673
Commercial Flood Area 12,633,175
Industrial Flood Area 17,991,605
Service 5,749,920
Jobs 32,196
Ratio of Jobs to Housing 1.45
Total Acres: 11,794
Source: Patterson General Plan 2010
Land within the General Plan area has also been divided into five loosely defined expansion areas as another way to illustrate where development has occurred and will continue to occur as shown on Figure 1-3. These five areas include the Northern Expansion Area, East Side Expansion Area, Southern Expansion Area, Canals Expansion Area and Foothills Expansion Area.

Figure 1-3 City of Patterson, General Plan Expansion Areas Source: Patterson General Plan 2010
A major goal of the City’s General Plan Land Use Element is to provide for orderly, well-planned, and balanced growth consistent with the limits imposed by the City’s infrastructure and environmental constraints. The Land Use Element also mentions that for commercial development, the goal is to designate

8.1.c
Packet Pg. 314 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 9 adequate land and provide support for the development of commercial uses and become the commercial service hub for western Stanislaus County.

1.2.8 Future Development
The areas located in the SOI shown in Figure 1-3, which are the areas the City plans to grow into and be potentially slated for future development. Understanding the potential hazard exposure in the area can help to mitigate the impacts of events before development occurs in those areas.

The City regularly updates its building codes to meet minimum standards in the California Building Code (CBC) last updated in 2019. Compliance with the 2019 CBC ensures construction standards are met and hazards risks related to earthquake, landslides, flood, severe weather, and wildfire are minimized. The City also complies with the National Flood Insurance Program (NFIP) and all development must meet minimum flood protection standards set forth by FEMA. Participation in the 2021-2022 MJHMP update planning process also ensures the City of Patterson continually reviews and updates hazard information and takes this information into account when reviewing development applications. This process will help the City make better decisions on where, when, and how future development occurs.

During this plan update process parcel analysis was conducted using the SOI and overlaid with available hazard risk layers to determine where future development may be at risk of natural hazard events. The results of the analysis have been integrated into the applicable hazard sections: flood and wildfire. Table 1-7 is the summary of the SOI total exposure for the City of Patterson.

Table 1-7 Sphere of Influence Total Exposure Summary
Property Type Improved
Parcel Count
Improved
Value
Estimated
Content
Value
Total Value
Industrial 1 $154,713 $154,713 $309,426
Residential 18 $3,100,887 $1,550,444 $4,651,331
Residential-Income 6 $565,468 $282,734 $848,202
Rural, Farm, Agricultural 108
$19,605,722
$19,605,722 $39,211,444
Vacant Residential 2 $35,909 $17,955 $53,864
Total 135 $23,462,699 $21,611,567 $45,074,266
Source: Stanislaus County Assessor, Wood analysis, City of Patterson 2 HAZARD IDENTIFICATION AND SUMMARY
The City of Patterson LPT identified the hazards that affect the City and summarized their frequency of occurrence, spatial extent, potential magnitude, and significance specific to their community (see Table 2-1). There are no hazards that are unique to Patterson, although the flood and wildfire risks in the City are greater and distinct from the flood and wildfire risks in the County’s planning area. The purpose of this section is to profile the City of Patterson hazards and assess the City’s specific vulnerabilities.

The hazards profiled in the County MJHMP Base Plan discuss the overall impacts on the County’s planning area. This information is summarized in the hazard description, geographic extent, magnitude/severity, previous occurrences, and probability of future occurrences sections. The information in the City of Patterson’s risk assessment summarizes only those hazards that vary from the County’s planning area.

The hazard profile information is organized in a similar format here as a way to identify priority hazards for mitigation purposes.

Table 2-1 summarizes the hazards profiled in the County’s planning area and risk assessment to provide a way for the LPT to evaluate which hazards are addressed in their General Plan Safety Element and which hazards are relevant and priority hazards for the City. The City’s General Plan Health and Safety Element addresses safety issues including seismic events, flooding, and fire hazards. Among the hazards addressed in the City’s General Plan Health and Safety Element, earthquake, flood, and wildfire hazards are further addressed in this Annex. Dam incidents and wildfire hazards are addressed for planning and awareness purposes only; they are not priority hazards for the City.

8.1.c
Packet Pg. 315 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 10 Table 2-1 City of Patterson —Hazard Profiles
Hazard Geographic
Area
Probability of
Future
Occurrence
Magnitude/Severity
(Extent)
Overall
Significance
Priority
Hazard?
Agriculture Pest and
Disease
Extensive Likely Negligible Low No
Aquatic Invasive
Species
Limited Likely Negligible Low No
Cyber Threats Significant Likely NA Medium No
Dam Incidents Limited Unlikely Limited Medium Yes
Drought Extensive Likely Critical High Yes
Earthquake Extensive Occasional Critical Medium Yes
Extreme Heat Extensive Highly Likely Critical Medium Yes Flood Significant Likely Catastrophic High Yes
Landslide,
Mud/Debris Flow,
Rockfall
Limited Occasional Negligible Low
No
Public Health
Hazards:

Pandemic/Epidemic
Extensive Occasional Critical High No
Severe Weather:

Dense Fog Extensive Likely Critical Medium No
Severe Weather:

Hail, Heavy Rain,
Thunderstorms,
Lightning
Extensive Highly Likely Critical High
No
Severe Weather:

High Wind/Tornado Extensive Highly Likely Critical High No Wildfire Significant Likely Negligible Medium No
Geographic Area
Limited: Less than 10% of planning area
Significant: 10-50% of planning area
Extensive: 50-100% of planning area
Probability of Future Occurrences
Highly Likely: Near 100% chance of occurrence
in next year or happens every year.

Likely: Between 10 and 100% chance of
occurrence in next year or has a recurrence
interval of 10 years or less.

Occasional: Between 1 and 10% chance of
occurrence in the next year or has a recurrence
interval of 11 to 100 years.

Unlikely: Less than 1% chance of occurrence in
next 100 years or has a recurrence interval of
greater than every 100 years.

Magnitude/Severity (Extent)
Catastrophic—More than 50 percent of property severely damaged; shutdown of facilities for more than 30 days; and/or multiple deaths Critical—25-50 percent of property severely damaged; shutdown of facilities for at least two weeks; and/or injuries and/or illnesses result in permanent disability
Limited—10-25 percent of property severely damaged; shutdown of facilities for more than a week; and/or injuries/illnesses treatable do not result in permanent disability
Negligible—Less than 10 percent of property severely damaged, shutdown of facilities and services for less than 24 hours; and/or injuries/illnesses treatable with first aid
Significance
Low: minimal potential impact
Medium: moderate potential impact
High: widespread potential impact

2.1 Vulnerability Assessment
The intent of this section is to assess Patterson’s vulnerability that is separate from that of the planning area as a whole, which has already been assessed in Section 4 Hazard Identification and Risk Assessment in the Base Plan. For flood hazards, the vulnerability assessment analyzes the population, property, and other assets at risk to hazards ranked of medium or high significance. For the other hazard profiles, the City described the specific vulnerabilities in the community by developing problem statements that qualitatively summarize areas of concern associated with the hazards that vary from other parts of the County planning area. These specific vulnerabilities are referred to as “problem statements” in the risk assessment. The problem statements are based on the risk assessment mapping and modelling and where spatial data and maps are not available, they are based on specific input from the City LPT. With this information mitigation actions were then developed to address these specific vulnerabilities; this process provides the connection between the problem statement and the mitigation action.

8.1.c
Packet Pg. 316 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 11 The information to support the hazard identification and risk assessment was based on a combination of the previous LHMP for the County, the City’s Safety Element, and jurisdiction-specific information collected during the 2021 update. A Data Collection Guide and associated worksheets were distributed to each participating municipality or special district to complete during the update process in 2021. Information collected was analyzed and summarized in order to identify and rank all the hazards that could impact anywhere within the County, as well as to rank the hazards and identify the related vulnerabilities unique to each jurisdiction.

Each participating jurisdiction was in support of the main hazard summary identified in the Base Plan (see Table 4-2). However, as previously noted the hazard summary rankings for each jurisdictional Annex may vary due to specific hazard risks and vulnerabilities unique to that jurisdiction. The information in this Annex helps differentiate the jurisdiction’s risk and vulnerabilities from that of the overall County, where applicable.

Note: The hazard “Significance” reflects the overall ranking for each hazard and is based on a combination of the City of Patterson’s LPT input from the Data Collection Guide, the risk assessment developed during the planning process (see Section 4 of the Base Plan), and the set of problem statements developed by the City LPT. The hazard significance summaries in Table 2 1 above reflect the hazards that could potentially affect City. The discussion of vulnerability for each of the following hazards is located in Section

2.3 Estimating Potential Losses, which includes and an overview on the local issues and areas of concern associated with the hazard, a problem statement for the priority hazard, and a quantitative risk assessment, where spatial data is available. Based on this analysis, the priority hazards for mitigation purposes for the City of Patterson are identified below.
• Dam Incidents
• Drought
• Earthquake
• Extreme Heat
• Flood
Cyber Attack, Pandemic/Epidemic, and Severe Weather hazards were ranked significant hazards but are not addressed further in this vulnerability assessment as the risk and exposure is similar to the overall County risk and exposure, and the potential for losses are difficult to quantify specific to the City of Patterson. Additionally, hazards assigned a significance rating of Low and which do not differ significantly from the County ranking (e.g., Low vs. High) are not addressed further and are not assessed individually for specific vulnerabilities in this Annex. In the City of Patterson, those hazards include: Agriculture Pests and Disease, Aquatic Invasive Species, Dam Inundation, and Landslide (Mud/Debris Flow, Rockfall). For example, landslide hazard was assessed for the City and based on the analysis and mapping, landslide hazard did not result in significant vulnerabilities or impacts. The exception is that for dam incidents, the City LPT raised concern regarding a proposed project – Del Puerto Canyon Reservoir. Therefore, dam incidents is also profiled in this Annex. Wildfire hazards are also addressed for planning and public awareness purposes.

2.2 Assets
This section considers Patterson’s assets at risk, including values at risk, critical facilities and infrastructure, historic assets, economic assets and growth and development trends.

2.2.1 Property Exposure
The following data on property exposure is derived from the Stanislaus County 2021 Parcel and Assessor data. This data should only be used as a guideline for overall values in the City as the information has some limitations. It is also important to note that in the event of a disaster, it is generally the value of the infrastructure or improvements to the land that is of concern or at risk. Generally, the land itself is not a loss and is not included in the values below. Table 2-2 shows the exposure of properties (e.g., the values at risk) broken down by property type for the City of Patterson.

Table 2-2 City of Patterson Property Exposure by Type
Property Type Improved
Parcel Count Improved Value Estimated Content Value Total Value

8.1.c
Packet Pg. 317 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 12 Commercial 169 $115,891,266 $115,891,266 $231,782,532
Industrial 72 $99,219,330 $148,828,995 $248,048,325
Residential-Income 73 $11,291,796 $5,645,898 $16,937,694 Rural, Farm,
Agricultural
31 $3,007,864 $3,007,864 $6,015,728
Unclassified 61 $370,566,992 $370,566,992 $741,133,984
Vacant Commercial 16 $522,393 $522,393 $1,044,786
Vacant Residential 7 $13,847,070 $6,923,535 $20,770,605 Total 6,318 $1,771,624,046 $1,230,025,611 $3,001,649,657 Source: Stanislaus County Assessor, Wood analysis

2.2.2 Critical Facilities and Infrastructure
For the purposes of this plan, a critical facility is defined as one that is essential in providing utility or direction either during the response to an emergency or during the recovery operation. FEMA sorts critical facilities into seven lifeline categories as shown in Figure 4-1 in the Base Plan. Table 2-3 shows a summary of the critical facilities within the City of Patterson. Critical facilities and other community assets as important to protect in the event of a disaster.

Table 2-3 Critical Facilities within the City of Patterson Lifeline # of Critical Facilities
Communication 2
Energy 3
Food, Water, Shelter 5
Hazardous Materials 3
Health and Medical 6
Safety and Security 11
Transportation 9
Total 39
Within the City of Patterson, the following are considered critical facilities:
• West Stanislaus County Fire Protection District Station 2 &30 • Patterson Police Department building
• Patterson City Hall (co-located with Police Department) • Water supply lines and wells
• Major electrical transmission lines and substations
• Major communication lines and microwave transmission facilities • Wastewater treatment plant, pumping stations, and trunk lines • Major public and private schools
• Emergency shelter
• Public Library
• Hospital facilities, nursing homes and dialysis centers HOST House Patterson is a designated shelter in Patterson for use in an emergency event.

2.2.3 Historic, Cultural and Natural Resources
Table 2-4 lists the historical resources located in the City of Patterson.

Table 2-4 Historical Resources in the City of Patterson Property Name Register Jurisdiction Date Listed
Former Carnegie Library National Patterson 12/10/1990
Plaza Building National Patterson 1/6/2004

8.1.c
Packet Pg. 318 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 13 Source: National Registry of Historic Places 2022
Natural resources are important to include in benefit-cost analyses for future projects and may be used to leverage additional funding for projects that also contribute to community goals for protecting sensitive natural resources. According to the City General Plan’s Natural Resources Element, the City’s important biological resources include foraging habitat and movement corridors for endangered wildlife species, riparian habitats along creeks, and other natural systems as they relate to both local and regional ecosystems. Awareness of natural assets can lead to opportunities for meeting multiple objectives. For instance, protecting wetlands areas protects sensitive habitat as well as attenuates and stores floodwaters.

2.3 Estimating Potential Losses

2.3.1 Dam Incidents
Protection from flood hazards created by dam failures is critical to the safety and well-being of Patterson residents. A dam vulnerability assessment was completed during the 2021 update, following the methodology described in Section 4 of the Base Plan. Dam inundation areas from the Don Pedro, Modesto Effluent Storage Areas, and New Exchequer dams win relation to the City of Patterson are shown in Figure 2-1. With the exception of the non-contiguous eastern portion of the City near the San Joaquin River, the dam inundation areas do not extend into the developed part of the City, and most of the City is not susceptible to dam incidents.

8.1.c
Packet Pg. 319 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 14 Figure 2-1 City of Patterson Dam Inundation
According to input received from the LPT during the plan update, the City’s LPT raised concerns regarding a proposed project – the Del Puerto Canyon Reservoir, which elevated the magnitude for potential dam incidents impact to critical facilities to limited. Del Puerto Water District (DPWD) and the San Joaquin River Exchange Contractors Water Authority (Exchange Contractors) are partnering to construct and operate the Del Puerto Canyon Reservoir. This Del Puerto Canyon Reservoir would be located in Del Puerto Canyon in the Coast Range foothills west of the City of Patterson and south of the Sacramento-San Joaquin Delta, west of I-5. The reservoir would allow water to be delivered into storage during wetter periods until needed in drier periods for irrigation, groundwater recharge, or wildlife beneficial uses. This proposed project would improve water supply reliability for agriculture and wildlife refuges, increase flood protection for the nearby areas, support the local and regional economy, and enhance the management of groundwater and surface water. However, the project raises dam safety concerns and the project partners are working on addressing the concerns by ensuring the dam is designed and built to meet all current requirements of the California Division of Safety of Dams (DSOD), and all applicable federal dam safety requirements. The design would

8.1.c
Packet Pg. 320 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 15 also be based on a detailed seismic hazards analysis for several nearby faults to ensure that the dam can withstand the maximum credible earthquake on nearby faults.

Critical Facilities at Risk
According to the City’s input, Patterson Fire Station 52 would be affected if a dam built in Del Puerto Canyon were to breach. Station 52 also functions as an Emergency Operation Center.

Future Development
None of the parcels within the City’s SOI are within the dam inundation areas.

2.3.2 Drought
Four water purveyors provide water to portions of the City, including the City’s Utilities Services, the Patterson Irrigation District (PID), West Stanislaus Irrigation District, (WSID), and the Del Puerto Water District (DPWD). The portion of the City west of the California Aqueduct does not fall within a water service area; property owners in this area west of the City obtain water from private groundwater wells.

The City of Patterson supplies potable groundwater for residential, industrial, and commercial uses in the City through a combination of groundwater wells, storage tanks, and a water systems network. Their main potable water source is groundwater from the Delta-Mendota Subbasin within the San Joaquin River Hydrologic Region. The City operates nine groundwater wells with a total capacity of 9,600 gallons per minute; projected production is approximately 7,500 acre-feet per year. The local groundwater basin has production limits due to both competing uses of local groundwater, and although studies have confirmed that groundwater in the vicinity of the City is not over drafted, in recent years the City has explored diversifying its water supply through artificial recharge of supplementary sources, relying on surface water deliveries from different basins, and direct injection (City of Patterson 2010). The City has also adopted a Water Master Plan that identifies arterial water distribution pipelines, water storage tanks, pressure control devices, and groundwater wells needed to serve the City through buildout. Additionally, the City implements a Drought Contingency Plan as part of their Urban Water Management Plan (UWMP) in the even that an extended drought impacts the groundwater supply.

2.3.3 Earthquake
The City of Patterson and surrounding areas' historical earthquake activity is below California’s state average. The Great Valley Thrust Fault System abuts Patterson’s western boundary. The Great Valley Thrust Fault System belongs to the Ortigalita Fault Zone, which is designated as an Alquist-Priolo Earthquake Fault Zone. This fault has not been active in historic times; however, there is no guarantee that it will never become active again. San Joaquin Fault, which is 15 miles south of Patterson, but which runs through the western portion of the City is also in the vicinity. Other nearby regional faults include the San Andreas fault zone, which is one of the longest and most active faults in California; the Hayward fault located east of San Francisco Bay to where it merges with the Calaveras Fault north of Hollister, and the Patterson Pass fault. The Patterson Pass fault runs northwest from the Alameda/San Joaquin County boundary toward Livermore; while its exact location is imprecise it generated a 4.5 magnitude earthquake in 1946 (City of Patterson 2010).

There is no record of any seismic activity originating within the City since 1881; however, the County of Stanislaus has been shaken by earthquakes that originated elsewhere. There is documented evidence of seven earthquakes that shook the Stanislaus County area, those of 1872, 1906, 1952, 1966, 1984, and 1989, and more recently in 2021 when residents felt the 6.0 magnitude earthquake centered in the Little Antelope Valley along the California/Nevada border (Gerike 2021). Minor damage has been recorded throughout the County from earthquakes with epicenters in surrounding areas, though major damage occurred from the 1906 Los Banos earthquake.

Based on the earthquake shaking potential mapped for Stanislaus County and the City of Patterson, due to the proximity to the Great Valley Thrust Fault System, Ortigalita Fault Zone and the San Joaquin Fault, and the history of shaking with no surface rupture, means the probability of damaging seismic ground shaking in the City of Patterson is considered as occasional. However, the City of Patterson did show high economic losses in the event of an earthquake, suggesting the presence of susceptible buildings and infrastructure (refer to Chapter 4 of the Base Plan). According to the City’s LPT there are unreinforced masonry (URM) constructed buildings in the City, but an inventory has not been completed that identifies these buildings. The City’s LPT also mentioned that at Patterson Fire Station 51’s apparatus bay, where

8.1.c
Packet Pg. 321 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 16 fire engines are parked, there are no reinforcement cinder block walls but only just blocks that are stacked up.

The activity of major faults outside Stanislaus County also suggests that the City could be subject to the effects of an earthquake in the future. Other hazards associated with earthquake activity, such as lateral spreading, surface cracking or differential setting, are considered unlikely to occur, although no studies have been conducted to determine the likelihood of these hazards.

2.3.4 Extreme Heat
While freeze events are not a common occurrence in the City of Patterson, the frequency of heat waves has been increasing in recent years across the County and the City of Patterson. As noted in the County Base Plan, climate change will continue to cause more extreme heat events and studies show that, by the end of this century, the number of days with temperatures reaching or exceeding 100°F is projected to increase as a result of climate change. As temperatures rise and extreme heat events last longer and become more severe and frequent, they will result in a rise in health problems and deaths caused by heat.

Some households in the City of Patterson lack air conditioning systems, and the City may need to add cooling centers or upgrade existing facilities with new HVAC equipment and permanent backup power to provide the community with a safe and cool place during extreme heat events. The City’s LPT mentioned focusing especially on DACs, such as those that are homeless, senior and disabled. The LPT noted that cooling centers need to cover the entire geographic extent of the City and be closer to the DACs. The LPT also mentioned that churches instead of business units would be more suitable as cooling centers; therefore coordination with faith-based groups and other community-based organizations should be promoted.

2.3.5 Flood and Levee Failure
The primary types of flood events in Stanislaus County that may impact the City of Patterson are riverine and local urban flooding. Regardless of the type of flood, the cause is often the result of severe weather and excessive rainfall, either in the flood area, upstream, or from winter snowmelt.

Areas in the eastern part of the City of Patterson have been determined to be in the FEMA Special Flood Hazard Area (SHFA) or 100-year floodplain. The physical risks associated with potential flooding and the regulatory requirements for floodplain management are important considerations when decisions are being made regarding future land use throughout the City. Parts of the City may also be vulnerable to localized stormwater flooding during severe storms. The rest of Patterson lies outside the 0.2% and 1% annual chance floodplains designated by FEMA. Based on the history of flooding in the County of Stanislaus, the City of Patterson and surrounding areas are considered likely to have the hazard potential for future flooding.

A flood vulnerability assessment was completed during the 2021 update, following the methodology described in Section 4 of the Base Plan. FEMA 1% and 0.2% annual chance floodplains within the City of Patterson are shown in
Figure 2-2. As shown in
Figure 2-2, more properties fall within the 0.2% annual chance floodplains than 1% annual chance floodplains. Table 2-5 and Table 2-6 summarize the values at risk in the City’s 1% and 0.2% annual chance floodplains.

8.1.c
Packet Pg. 322 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 17 Figure 2-2 City of Patterson FEMA 1% & 0.2% Annual Chance Floodplains Table 2-5 City of Patterson FEMA 1% Annual Chance Flood Hazard, by Property Type Property
Type
Improved
Parcel
Count
Improved
Value
Estimated
Content
Value
Total Value
Estimated
Loss Population
Commercial 15 $4,310,706 $4,310,706 $8,621,412 $2,155,353 Industrial 2 $469,751 $704,627 $1,174,378 $293,594
Residential 407 $54,926,055 $27,463,028 $82,389,083 $20,597,271 1,506 ResidentialIncome8 $1,372,588 $686,294 $2,058,882 $514,721 30 Unclassified 10 $4,459,171 $4,459,171 $8,918,342 $2,229,586 Total 442 $65,538,271 $37,623,825 $103,162,096 $25,790,524 1,536 Source: Stanislaus County Assessor’s Office; National Flood Hazard Layer Effective 8/24/2021; FEMA; Wood analysis

8.1.c
Packet Pg. 323 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 18 Table 2-6 City of Patterson FEMA 0.2% Annual Chance Flood Hazard, by Property Type Property
Type
Improved
Parcel
Count
Improved
Value
Estimated
Content
Value
Total Value Estimated
Loss Population
Commercial 103 $57,997,592 $57,997,592 $115,995,184 $28,998,796 Industrial 16 $5,830,284 $8,745,426 $14,575,710 $3,643,928 Residential 4,227 $871,169,044 $435,584,522 $1,306,753,566 $326,688,392 15,640 ResidentialIncome47 $7,507,122 $3,753,561 $11,260,683 $2,815,171 174 Rural,
Farm,
Agricultural
14 $1,716,867 $1,716,867 $3,433,734 $858,434
Unclassified 39 $40,898,545 $40,898,545 $81,797,090 $20,449,273 Vacant
Commercial
5 $118,338 $118,338 $236,676 $59,169
Vacant
Residential
7 $13,847,070 $6,923,535 $20,770,605 $5,192,651
Total 4,458 $999,084,862 $555,738,386 $1,554,823,248 $388,705,812 15,814 Source: Stanislaus County Assessor’s Office; National Flood Hazard Layer Effective 8/24/2021; FEMA; Wood analysis Based on this analysis, the City of Patterson has 442 improved parcels located within the 1% annual chance floodplain for a total value of around $103.1 million. The potential loss is estimated at around $25.8 million if these areas were inundated by the 1% annual chance flood. In addition, the City of Patterson has 4,458 improved parcels located within the 0.2 annual chance floodplain for a total value of around $1.6 billion.

The potential loss is estimated at around $388.7 million if these areas were inundated by the 0.2% annual chance flood. The population at risk was calculated for the 1% and 0.2% annual chance floodplains based on the number of residential properties at risk and the average number of persons per household (3.7).

There are an estimated 1,536 persons at risk to 1% annual chance flood and 15,814 persons at risk to

0.2% annual chance flood in the City of Patterson.

Moreover, DWR Awareness 100-year and USACE Comprehensive Study 200-year floodplains within the City of Patterson are shown in Figure 2-3.

8.1.c
Packet Pg. 324 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 19 Figure 2-3 City of Patterson DWR Awareness 100-Year & USACE Comprehensive Study 2—Year Floodplains
Critical Facilities at Risk
Critical facilities are those community components that are most needed to withstand the impacts of disaster as previously described. Figure 2-4 shows the location of the critical facilities in the City’s 1% and 0.2% annual percent chance floodplains. Table 2-7 and Table 2-8 list the critical facilities in the City’s 1% and

0.2% annual chance floodplains. There are a total of 4 facilities potentially exposed to a 1% annual chance flood events, including the three bridges and one senior apartment. There are a total of 21 facilities potentially exposed to a 0.2% annual chance flood events, including the City’s city hall, police department and various assisted living facilities, schools and bridges. the three bridges and one senior apartment. The impact on the community could be great if any of these facilities are damaged or destroyed during a flood event.

8.1.c
Packet Pg. 325 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 20 Figure 2-4 Critical Facilities at Risk of FEMA 1% & 0.2% Annual Flood Hazard Table 2-7 Critical Facilities at risk of 1% Annual Chance Flood Hazard, by FEMA Lifeline FEMA Lifeline Count
Communications -
Energy -
Food, Water, Shelter -
Hazardous Materials -
Health and Medical 1
Safety and Security -
Transportation 3
Total 4
Source: Stanislaus County, HIFLD, NID, DWR, FEMA NFHL 8/24/2021

8.1.c
Packet Pg. 326 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 21 Table 2-8 Critical Facilities at risk of 0.2% Annual Chance Flood Hazard, by FEMA Lifeline FEMA Lifeline Count
Communications -
Energy -
Food, Water, Shelter 3
Hazardous Materials -
Health and Medical 4
Safety and Security 10
Transportation 4
Total 21
Source: Stanislaus County, HIFLD, NID, DWR, FEMA NFHL 8/24/2021 Insurance Coverage, Claims Paid, and Repetitive Losses
The City of Patterson joined the National Flood Insurance Program (NFIP) on August 1, 1979. NFIP Insurance data indicates that as of April 2022, there were 181 flood insurance policies in force in the City with $43,684,400 of coverage. 160 of these policies are located in A-zones. All of the policies are single family residential and located in the B, C, and X zone.

There has been 32 historical claims for flood losses totaling $274,891. According to the FEMA Community Information System accessed April 6, 2022, the City has had nine Repetitive Loss properties but no Severe Repetitive Loss properties.

Future Development
The results of the SOI and flood analysis are shown in Table 2-9 and Table 2-10. This analysis indicates the risk to existing development that could be under the City’s jurisdiction if the area was annexed. As shown numerous properties would be exposed to flood hazards in the SOI if they were developed in the future.

Table 2-9 Sphere of Influence Areas Exposed to 1% Annual Chance Flood Hazard Property Type
Improved
Parcel
Count
Improved
Value
Estimated
Content Value
Total
Value
Estimated
Loss Population
Residential 11
$1,987,635
$993,818
$2,981,453
$745,363 41
Residential-Income 3 $355,414 $177,707 $533,121 $133,280 11 Rural, Farm,
Agricultural
4 $752,692 $752,692
$1,505,384
$376,346
Vacant Residential 1 $10,803 $5,402 $16,205 $4,051 4
Total 19 $3,106,544 $1,929,618 $5,036,162 $1,259,041 56 Source: Stanislaus County Assessor, Wood analysis
Table 2-10 Sphere of Influence Areas Exposed to 0.2% Annual Chance Flood Hazard Property Type Improved
Parcel Count
Improved
Value
Estimated
Content
Value
Total Value Estimated
Loss Population
Residential 5 $695,177 $347,589 $1,042,766 $260,691 19
Rural, Farm,
Agricultural
11 $966,933 $966,933 $1,933,866 $483,467
Total 16 $1,662,110 $1,314,522 $2,976,632 $744,158 19
Source: Stanislaus County Assessor, Wood analysis

8.1.c
Packet Pg. 327 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 22

2.3.6 Landslide
As shown in Figure 2-5, deep-seated landslide susceptibility is high within the Diablo Mountain foothills, which abuts the City’s western boundary. Therefore, landslide hazard is rated a medium significance hazard, although there is little deep-seated landslide susceptibility within the City Limits. As such, this hazard is profiled for planning and awareness purposes and is not a priority hazard for the City.

Figure 2-5 City of Patterson Deep-seated Landslide Susceptibility

2.3.7 Wildfire
Both urban and wildland fires conditions exist in Stanislaus County, which increases the chances for damage to property, loss of life and/or injury. In most of Stanislaus County, the California Department of Forestry and Fire Protection (CAL FIRE) ranks fuel loading as low. Fuels are mainly crops and grasses in the County and in the City of Patterson. In the far western and eastern portions of the County in areas

8.1.c
Packet Pg. 328 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 23 identified by CAL FIRE as State Responsibility Areas (SRAs), there is undeveloped and rugged terrain that contains highly flammable grass, brush, and some pine fuels, which are ranked as moderate fuel hazards, primarily in the area west of I-5. While there is a small area within the City with a very high fire threat, there are no very high wildfire hazard severity zones in the City. Wildfire hazards are addressed for planning and awareness purposes only; although the City bordered a very high wildfire threat area to the immediate west, wildfire hazard are not a priority hazard for the City.

Figure 2-6 shows the wildfire threat areas in the City of Patterson and Table 2-11 summarizes the values at risk, detailed loss estimates and populations at risk. While there is a small area within the City with a very high fire threat, there are no very high wildfire hazard severity zones in the City. Wildfire hazards are addressed for planning and awareness purposes only; although the City bordered a very high wildfire threat area to the immediate west, wildfire hazard are not a priority hazard for the City.

Figure 2-6 Wildfire Threat Areas in City of Patterson

8.1.c
Packet Pg. 329 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 24 Table 2-11 Properties Exposed to Wildfire Threat Areas
Property Type
Improved
Parcel
Count
Extreme
Improved
Parcel Count
Very
High
Improved
Parcel
Count
High
Improved
Parcel
Count
Moderate
Total
Improved
Parcel
Count
Improved
Value
Estimated
Content Value Total Value Population
Commercial 0 0 1 3 4 $17,220,994 $17,220,994 $34,441,988 Industrial 0 0 0 3 3 $1,757,000 $2,635,500 $4,392,500
Residential 0 0 3 106 109 $27,103,237 $13,551,619 $40,654,856 403 ResidentialIncome0 0 1 0 1 $138,733 $69,367 $208,100 4 Rural, Farm,
Agricultural
0 1 0 1 2 $70,955 $70,955 $141,910
Vacant
Residential
0 0 0 1 1 $7,960 $3,980 $11,940
Total 0 1 5 114 120 $46,298,879 $33,552,414 $79,851,293 407 Source: CAL FIRE, Stanislaus County Assessor, Wood GIS analysis

8.1.c
Packet Pg. 330 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 25 Table 2-12 shows the results of the critical facility analysis by fire threat area. The one critical facility located within the Very High Wildfire Threat area is an electric substation.

Table 2-12 Critical Facilities Exposed to Wildfire Threat Areas FEMA Lifeline Count
Very High Wildfire Threat
Energy 1
Moderate Wildfire Threat
Communications 2
Low Wildfire Threat
Safety and Security 1
Transportation 1
Total 5
Source: Stanislaus County, HIFLD, NID, DWR, CAL FIRE, FRAP, Wood GIS Analysis Future Development
The results of the SOI and wildfire analysis are shown in Table 2-13.

Table 2-13 Sphere of Influence Areas Exposed Within Fire Threat Areas Property
Type
Improved
Parcel
Count
Moderate
Total
Building
Count
Improved
Value
Estimated
Content
Value
Total Value Population
Residential 1 1 $152,068 $76,034 $228,102 4
Rural,
Farm,
Agricultural
10 10 $1,445,772 $1,445,772 $2,891,544
Total 11 11 $1,597,840 $1,521,806 $3,119,646 4
Source: Stanislaus County Assessor, CALFIRE, Wood analysis 3 CAPABILITY ASSESSMENT
Capabilities are the programs and policies currently in use to reduce hazard impacts or that could be used to implement hazard mitigation activities. This capabilities assessment is divided into five sections:
regulatory mitigation capabilities, administrative and technical mitigation capabilities, fiscal mitigation capabilities, mitigation outreach and partnerships, and other mitigation efforts. To develop this capability assessment, the LPT representatives reviewed a matrix of common mitigation activities to inventory which of these policies or programs and shared any updates or changes through the Patterson Data Collection Guide. The team then supplemented this inventory by reviewing additional existing policies, regulations, plans, and programs to determine if they contribute to reducing hazard-related losses.

During the plan update process, this inventory was reviewed by the jurisdictional planning representatives and Wood consultant team staff to update information where applicable and note ways in which these capabilities have improved or expanded. Additionally, in summarizing current capabilities and identifying gaps, the jurisdictional planning representatives also considered their ability to expand or improve upon existing policies and programs as potential new mitigation strategies. The City of Patterson’s capabilities are summarized below.

3.1 Regulatory Capability
The regulatory and planning capabilities table lists planning and land management tools typically used by local jurisdictions to implement hazard mitigation activities. The table below indicates those that are in place in the City of Patterson.

8.1.c
Packet Pg. 331 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 26 Table 3-1 City of Patterson —Regulatory and Planning Capabilities Regulatory Tool
(ordinances, codes, plans) Yes/No Comments
General Plan Yes Adopted November 30, 2010
Zoning ordinance Yes Title 18
Subdivision ordinance Yes Title 16 (Divisions of land)
Growth management ordinance No No
Floodplain ordinance Yes Title 17 Flood Hazard Areas
Other special purpose ordinance
(stormwater, steep slope, wildfire)
Yes Chapter 13.32
Urban Storm Water Quality Management and Discharge
Control
Building code Yes Title 15 Buildings and Construction
Fire department ISO rating Yes Rating 2/2Y
Erosion or sediment control program Yes Chapter 16.72
Environmental Impact, and Grading and Erosion Control
Stormwater management program Yes Chapter 13.32
Urban Storm Water Quality Management and Discharge
Control
Site plan review requirements Yes Chapter 18.14
General Application Processing
Capital improvements plan Yes
Economic development plan Yes
Local emergency operations plan Yes
Other special plans No
Flood insurance study or other
engineering study for streams
Yes Included in the County’s FIS, which was revised on
August 24, 2021
Elevation certificates (for floodplain
development)
Yes Mentioned in 17.12.030 Standards for subdivisions
within Chapter 17.12
Provisions for Flood Hazard Reduction
Other
Patterson 2030 General Plan (2010)
The Patterson General Plan covers two planning timeframes – 20 years and 40 years into the future. The plan analyzes issues of importance to the community, sets forth policies in text and diagrams for conservation and development, and outlines specific programs for implementing these policies. By focusing attention on the issues facing the community and placing them in an expanded time frame, the General Plan helps citizens see their community as a complex system- a living entity that grows and responds to problems and opportunities - and it helps to guide the community.

The General Plan serves to establish within local government the capacity to analyze local and regional conditions and needs in order to respond effectively to the problems and opportunities facing the community. The General Plan identifies the community’s environmental, social, and economic goals as well as records the local government’s policies and standards for the maintenance and improvement of existing development and the location and characteristics of future development. Moreover, the City’s General Plan provides citizens with information about their community and with opportunities to participate in the local planning and decision-making process. It also establishes a basis for subsequent planning efforts, such as preparation of specific plans, redevelopment plans, and special studies, to deal with unique problems or areas in the community.

Emergency Services Ordinance, Chapter 2.36
The declared purposes of the Emergency Services Ordinance is to provide for the preparation and carrying out of plans for the protection of persons and property within the City in the event of an emergency; the direction of the Emergency Organization; and the coordination of the emergency functions of the City with all other public agencies, corporations, organizations and affected private persons. The Ordinance establishes the Disaster Council membership, the Disaster Council's powers and duties, which include developing and recommending for adoption by the city council, emergency & mutual aid plans and agreements, and such ordinances and resolutions and rules and regulations as are necessary to implement

8.1.c
Packet Pg. 332 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 27 such plans and agreements. Moreover, the Ordinance mentions that the City Manager shall be the director of emergency services and the chairman of the Patterson Disaster Council.

California Fire Code Ordinance, Chapter 15.20
The City of Patterson adopts by reference as its fire code, the California Fire Code, 2019 Edition, including Appendix Chapter 4, Appendices B, BB, C, CC, D, E, F, G, I, K, and Division II Administration. The Fire Code regulates the safeguarding of life and property from fire and explosion hazards arising from the storage, handling, and use of hazardous substances, materials and devices, and from conditions hazardous to life or property in the occupancy of buildings. The Code also authorizes the City to issue permits, collect fees, and provide penalties for the violation and each and all of the regulations, provisions, penalties, conditions and terms of the California Fire Code, 2019 Edition.

Flood Hazard Prevention Ordinance Title 17
The purpose of the City’s Flood Hazard Prevention Ordinance is to promote public health, safety, and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed. The ordinance aims to protect human life and health, as well as minimize the expenditure of public money for costly flood control projects, the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public. The Flood Hazard Prevention Ordinance is also in place to minimize prolonged business interruptions and damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, and streets and bridges located in areas of special flood hazard. Moreover, the Ordinance helps maintain a stable tax base by providing for the sound use and development of areas of special flood hazard to minimize future blighted areas caused by flood damage. The Ordinance also ensures that potential buyers are notified that a property is in an SFHA and that those who occupy the areas of special flood hazard assume responsibility for their actions.

Urban Storm Water Quality Management and Discharge Control, Chapter 13.32 The purpose of this Urban Storm Water Quality Management and Discharge Control Ordinance is to protect and promote the health, safety and general welfare of the citizens of the City by controlling non-stormwater discharges to the stormwater conveyance system from spills, dumping or disposal of materials other than stormwater, and by reducing pollutants in urban stormwater discharges to the maximum extent practicable.

The ordinance also intends to assist in the protection and enhancement of the water quality of watercourses, water bodies and wetlands in a manner consistent with the Federal Clean Water Act (33 U.S.C. §§ 1251 et seq.), by reducing pollutants in stormwater discharges to the maximum extent practicable, and through prohibiting non-stormwater discharges into the storm drain system.

City of Patterson Strategic Plan 2017 – 2021
The Strategic Plan was developed over a six-month process, including work sessions on goals and objectives with City leadership, staff surveys, department strategy development and refinement, public meetings and feedback from city council members. The foundation of the planning process was focused on key changes in the City’s recent history that began taking shape in early 2012, including the beginning of economic recovery, hiring a new city manager and building strong working relations within the city and with Stanislaus County. The Strategic Plan established strategic goals for community & economic development, community livability & quality of life, efficient & effective government and infrastructure & the built environment.

3.2 Administrative and Technical Capability
The table below identifies City personnel with responsibilities for activities related to mitigation and loss prevention in the City of Patterson. Many positions are full time and/or filled by the same person. A summary of technical resources follows.

Table 3-2 City of Patterson —Personnel Capabilities
Personnel Resources Yes/No Department/Position Comments Planner/engineer with knowledge of land
development/land management practices Yes Community Development Department

8.1.c
Packet Pg. 333 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 28 Personnel Resources Yes/No Department/Position Comments Engineer/professional trained in
construction practices related to buildings
and/or infrastructure
Yes
Engineering, Building, and
Capital Projects Department
Planner/engineer/scientist with an
understanding of natural hazards Yes Community Development Department Personnel skilled in GIS No
Full time building official Yes Engineering, Building, and Capital Projects Department
Floodplain manager Yes City Manager (Floodplain
Administrator)
Emergency manager Yes City Administrator (Director
of Emergency Services)
Grant writer Yes Administration
Other personnel
Yes
Multiple agencies and
departments with support
personnel expanding
capabilities for mitigation
GIS Data Resources
(Hazard areas, critical facilities, land use,
building footprints, etc.)
No
Warning Systems/Services
(Reverse 9-11, cable override, outdoor
warning signals)
No
Other
City Council
The City Council consists of five representatives, the Mayor is elected to two-year terms and four Council members are each elected in district elections to four-year terms on a staggered basis; this means every two years there are either two council seats and the Mayor seat up for election. The City Council appoints a City Manager, who hires all city staff and manages the day-to-day business of the city. Advisory bodies work with the City Council and identify issues before the Council makes final decisions. Advisory body members are appointed by the Mayor, subject to the approval of a majority of the Council.

City Manager
The City Manager is appointed by and serves at the pleasure of the City Council. The City Manager carries out City Council policies by coordinating the overall day-to-day operations of city services, performing longrange strategic planning, overseeing redevelopment agency projects, overseeing citywide budget preparation, and implementing public policy and affairs in support of City Council goals and objectives. The City Manager also supports the information and policy-making needs of the City Council by assisting elected officials in policy development and external governmental matters.

City Clerk
The City Clerk is the residents’ liaison to the City Council, researching legislative data and coordinating responses to requests for specific action or information on City-related services. The City Clerk is responsible for the legislative proceedings of the City Council, Political Reform Act filings, elections, records management, public records (including agendas and minutes). The City Clerk also conducts recruitment for the various City Commissions, Committees and Board vacancies when needed.

The City Clerk fills a variety of roles, from record keeper to public contact, and has a variety of responsibilities that include: custodian of official City documents and records including responsibility for the corporate seal of the City; responding to requests for public records; providing information about City services; serving as the Elections Official for the City; and researching legislation, maintaining records such as legislative proceedings, and Council agendas and minutes. The City Clerk also conducts recruitments to fill vacancies on City Commissions, Committees and Boards and serves as Filing Officer for the Fair Political Practices Commission; and clerk/secretary to the City Council.

8.1.c
Packet Pg. 334 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 29 Community Development Department & Planning Division
The Community Development Department performs a variety of services intended to protect, maintain and develop an attractive, safe and healthy community. The Department’s Planning Division, in particular, is responsible for project analysis for property development and use review. The Planning Division is staff to the City Council, the Planning Commission and the Economic Strategic Commission on planning matters.

It is also responsible for the implementation of the General Plan through the administration of the Zoning Code, Subdivision Map Act, municipal ordinances, California Environmental Quality Act (CEQA), annexation law, and special studies as appropriate. Moreover, The division is responsible for the administration of housing grants and programs, home occupation permits, use permits and variances, and coordination of architectural preservation matters.

Engineering, Building, and Capital Projects Department
The City’s Engineering, Building, and Capital Projects Department is dedicated to enhancing the quality of life for the residents of Patterson. With well-engineered City infrastructure projects, buildings that meet California Building Code Requirements, and a Capital Projects Program, the City can meet the needs as a growing City.

The Engineering Division is responsible for designing, developing civic facilities, reviewing proposals for land development projects and executing the design of construction projects. The Building Division is responsible for the enforcement of codes, laws, ordinances, and regulations on residential and commercial building construction and remodeling within the city. The Capital Projects Division is responsible for the short and long-range planning, design and construction of capital projects. This division ensures that all public improvements are built according to City, State and Federal standards.

Finance Department
The Finance Department manages all financial activity for the City of Patterson. The department properly records all transactions, maintains all City Funds and Accounts, and accurately tracks and reports all City investments. The department ensures the integrity and sound fiscal judgment in all financial functions for the best interest of the City of Patterson's Citizens and our Community.

Fire Department
The Patterson Fire Department (PFD) provides all-risk emergency services to the City of Patterson and, through an automatic-aid agreement, portions of the West Stanislaus Fire Protection District service area.

The department provides a wide variety of services to an expanding and diverse population. These services include fire suppression, advanced life support, hazardous materials mitigation, urban search and rescue, water rescue, community education, disaster preparedness and fire prevention.

Human Resources Division
The mission of the Human Resources Division is to proactively partner with customers and deliver quality services to attract, select, and retain a productive, effective, and diverse workforce. The division’s mission is to provide leadership and high-quality service to all customers by assessing and proactively addressing their needs through developing, delivering, and continuously improving the division’s programs and services in support of the City's vision.

Police Department
Patterson Police Services provides the City of Patterson with a wide range of municipal law enforcement services including, but not limited to administration, citizen volunteer programs investigations, patrol, records management, recruitment, specialized enforcement teams, training, and traffic enforcement.

Public Works Department
The Public Works Department’s mission is to provide the highest level of service to the residents of Patterson while maintaining the community's infrastructure in the most cost-effective manner possible. It is the largest department in the City, dealing with basic infrastructure and providing vital City services.

8.1.c
Packet Pg. 335 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 30 City of Patterson Commissions
The City has multiple commissions, including an Economic Strategic Commission, a Parks, Recreation & Beautification Commission, a Planning Commission, a Parks & Recreation Commission and a Public Safety Committee.

3.3 Fiscal Capability
The following table identifies financial tools or resources that the City could potentially use to help fund mitigation activities. There are currently no specific funding sources for hazard mitigation.

Table 3-3 City of Patterson —Available Financial Tools and Resources Financial Resources
Accessible/
Eligible to
Use
Has This Been Used for
Mitigation in the Past? Comments
Community Development
Block Grants
Yes No
Capital improvements project
funding
Yes No
Authority to levy taxes for
specific purposes
Yes No Must be approved by voters
Fees for water, sewer, gas, or
electric services, new
development
Yes
No
Incur debt through general
obligation bonds
Yes No
Incur debt through special tax
bonds
Yes No Requires approval by two-thirds of
voters
Incur debt through private
activities
Yes No Do not have any in place
Federal Grant Programs
(Hazard Mitigation Grant
Program)
Yes
No
Various Departments

3.4 Outreach and Partnerships
The Stanislaus Office of Emergency Services (OES) is responsible for the day-to-day administration of Stanislaus County's disaster preparedness, mitigation, response and recovery programs. OES develops and maintains the Stanislaus County Emergency Operations Plan and its associated annexes. OES also coordinates training, planning and exercises for first responders throughout the Stanislaus Operational Area. According to Stanislaus County OES’ 2021 – Emergency Management Strategic Plan, OES listed “increase number of outreach engagements (i.e. meetings, events) as an action item to achieve one of its strategic goals, which is to build a culture of preparedness. The Stanislaus County OES will work with community partners to develop agreements for mutual aid, facilitate discussion with partners regarding preparedness planning, conduct outreach activities to engage residents, and attend emergency management trainings and conferences to stay up to date with the most current practices for disaster preparedness.

Moreover, the Stanislaus County OES protects the public’s safety by developing and maintaining general and specific preparedness programs for the County and its nine cities. The OES educates and informs the public in the areas of emergency preparedness and fire prevention.

During the 2021-2022 planning process the following outreach efforts were identified that the City of Patterson could support related to hazard mitigation:
• Outreach through the City’s Floodplain Management Program • Fire Prevention School Programs
• Flood Zone Informational Webpages
• FEMA Informational Brochures
• Mid San Joaquin-Regional Flood Management Plan
• Social Media (Facebook, Instagram)

8.1.c
Packet Pg. 336 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 31 Education and outreach efforts, as well as emergency response planning, will need to address the needs of low-income residents, DACs, and the large Spanish-speaking population. The City’s LPT noted that this additional coordination with faith-based organizations should be encouraged among City departments.

3.5 Other Mitigation Efforts
In addition to the projects identified in the City’s Mitigation Action plan, the City of Patterson’s Department conducts annual fire and life safety inspections for all businesses. The Public Works Department provides a sandbag program during local rain/flooding events. City staff also participate in National Incident Management System (NIMS) training through OES as well as First Aid, CPR, and AED contracted training.

Furthermore, the City’s General Plan Update and the 6th Cycle Housing Element are in process, with anticipated completion in 2022/2023. The General Plan will incorporate the 2022-2027 Stanislaus MJHMP and the City of Patterson Annex by reference.

3.6 Opportunities for Enhancement
Based on the capability assessment, the City of Patterson has existing regulatory, administrative/technical, and fiscal mechanisms in place that help to mitigate hazards. In addition to these existing capabilities, there are opportunities for the City to expand or improve on these policies and programs to further protect the community. These are organized below by regulatory, administrative/technical, fiscal, and outreach opportunities.

Regulatory Opportunities
Future opportunities for regulatory enhancement should focus on compliance with Assembly Bill 2140, including amending the City of Patterson General Plan Safety Element to incorporate the 2021-2022 Stanislaus County MJHMP and City of Patterson Annex by reference.

Administrative/Technical Opportunities
Other future enhancements may include providing hazard training for staff or hazard mitigation grant funding in partnership with Stanislaus County and Cal OES. Existing City staff are aware of the benefits of participating in training and webinars offered by Cal OES Hazard Mitigation Assistance (HMA) Team related to HMGP opportunities, HMGP Sub application Development support, and other funding programs, such as Prepare California Jumpstart. Other opportunities may be related to coordinating and educating key stakeholders in the City. Each stakeholder group has been involved in the development of the LHMP and may be interested in aligning efforts related to hazard mitigation and also supporting HMGP Sub applications and other hazard mitigation trainings.

Fiscal Opportunities
The City can update other plans, such as their CIP to incorporate hazard information and include hazard mitigation actions and climate adaptation strategies that relate to infrastructure systems resiliency associated with the water and wastewater systems. Once projects related to hazard mitigation are approved, the recent CIP can be shared with the community on the City’s webpage. Capital investments and improvements related to seismic retrofits, cooling center upgrades, and WWTP upgrades should all be emphasized in the outreach materials as they are related to hazard mitigation. Additionally, given the prioritization of local stormwater flooding mitigation projects, the City should apply for HMGP grants to fund implementation costs associated with key CIP projects, and related projects in the City’s mitigation strategy.

These fiscal capabilities may be supported by City staff or augmented with Consultant staff.

Outreach Opportunities
The City can also expand their outreach capabilities related to the implementation of the 2022-2027 Stanislaus County MJHMP and the City of Patterson Annex. Specific enhancements may include continued public involvement through social media posts and advertisements focused on projects successes related to the Annex Mitigation Strategy and focused outreach to under-represented and special-interest groups in the City. The City can also develop outreach kits for partner organizations.

8.1.c
Packet Pg. 337 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 32 4 MITIGATION STRATEGY

4.1 Goals and Objectives
The City of Patterson adopts the hazard mitigation goals and objectives developed by the HMPC and described in Section 5 Mitigation Strategy of the Base Plan. Like the Mitigation Strategy in the Base Plan, this section outlines the City’s roadmap for future hazard mitigation administration and implementation. The purpose of the strategy is to reduce vulnerabilities from key priority hazards outlined in the risk assessment through regulatory tools and projects.

4.2 Continued Compliance with the National Flood Insurance Program The City has been an NFIP participating community since 1979. In addition to the mitigation actions identified herein the City will continue to comply with the NFIP. Floodplain management is under the purview of the City’s Public Works Department Environmental Programs. Floodplain Management and Stormwater Management are two separate programs, in additional to Water Resources under the Public Works Departments. The Floodplain Management Program oversees the City’s participation with the NFIP and regulates and implements the City’s Flood Hazard Prevention Ordinance. This Program also provides NFIP information and mapping and insurance services. Similarly, the City’s Storm Water Management Program oversees the City’s storm drainage system to prevent flooding and protect water quality. The City’s Water Resources are managed by the Water Resources Program and Utilities Services through the City’s groundwater well network and water supply system. Together, these various departments enforce local floodplain development regulations, issue permits for appropriate development in SFHAs and ensure that this development is mitigated in accordance with the regulations. This also includes periodic reviews of the Flood Hazard Prevention Ordinance to ensure that it is clear and up to date and reflects new or revised flood hazard mapping.

4.3 Mitigation Actions
The LPT for the City identified and prioritized the following new mitigation actions based on risk assessments, goals, and objectives. Background information as well as information on how the action will be implemented and administered, such as ideas for implementation, responsible office, partners, potential funding, estimated cost, and timeline also are described. Because the City did not participate in the 2017 LHMP, the LPT did not have existing mitigation actions to review and did not provide status updates on past hazard mitigation planning efforts.

The mitigation strategy includes only those actions and projects which reflect the actual priorities and capacity of the jurisdiction to implement over the next five years covered by this plan. It should further be noted, that although a jurisdiction may not have specific projects identified for each significant (medium or high) hazard for the five-year coverage of this planning process, each jurisdiction has focused on identifying those projects which are realistic and reasonable for them to implement. Should future projects be identified for priority hazards where the implementing jurisdiction has the capacity to implement, the jurisdiction would add those projects to their Annex. The City also recognizes that other mitigation actions proposed in the County’s mitigation strategy will cover the significant hazards in the City that are not currently linked to a mitigation action.

8.1.c
Packet Pg. 338 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 33 Table 4-1 City of Patterson Mitigation Action Plan
ID
Goal(s)
and
Lifelines
Hazard(s)
Mitigated Description/Background/Benefits
Lead
Agency and
Partners
Cost
Estimate
and
Potential
Funding
Priority Timeline Status/Implementation
Notes
1 Goals 1,
2, and 5:

Safety
and
Security
Dam
Incidents
The City shall establish and maintain
cooperative working relationships
among public agencies, dam
operators, DSOD, DPWD, San
Joaquin River Exchange Contractors
Authority, and the County of
Stanislaus to ensure that dam incident
and flood inundation impacts to
existing essential public facilities,
such as Fire Station 52 (City’s EOC)
are minimized. This action is intended
to focus on dam safety concerns
related to the Del Puerto Canyon
Reservoir in Del Puerto Canyon in the
Coast Range foothills west of the City
of Patterson and south of the
Sacramento-San Joaquin Delta.

City of
Patterson
Public Works
Department,
Dam
Operators,
DSOD,
DPWD, San
Joaquin River
Exchange
Contractors
Authority,
Stanislaus
County
>$100,000;
General
Fund
High 3-5 years New in 2022.
2 Goals 1,
3, 4, and
5; Safety
and
Security
Drought
Develop a Public Awareness
Campaign on Water Conservation –
The City will organize a Social Media
Campaign that will run quarterly on
City of Patterson platforms to
advertise and promote conservation
and water saving ideas that can be
performed by the public.

City of
Patterson
Executive
Team,
Community
Development
Department,
Public Works
Department
$10,000 -
$100,000;
General
Fund
High 1-3 years New in 2022.
3 Goals 3,
4 and 5;
Safety
and
Security
Drought
Further restrict outdoor water use
during drought events beyond the
already established requirements in
the City’s Urban Water Management
Plan and Drought Contingency Plan.

City of
Patterson
Executive
Team
$10,000 -
$100,000;
General
Fund
Medium 1-3 years New in 2022.
4 Goals 1
and 3;
Safety
and
Security
Earthquake
Conduct public outreach about
earthquake risk and mitigation
activities
City of
Patterson
Executive
Team,
Community
$10,000 -
$100,000;
General
Fund
Medium 1-3 years New in 2022.

8.1.c
Packet Pg. 339 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 34 Development
Department
5 Goals 1
and 5;
Safety
and
Security
Earthquake
Continue to implement policies
established in the City’s General Plan
Health and Safety Element, such as
requiring the preparation of
geotechnical reports to impose
appropriate mitigation measures to
ensure, within the limits of technical
and economic feasibility, that new
structures are able to withstand the
effects of seismic activity, including
liquefaction, slope instability,
expansive soils or other geologic
hazards.

City of
Patterson,
Public Works
Department
> $100,000;
General
Fund
Medium 1-3 years
New in 2022. The City’s
Health and Safety Element
contains a mutuallyreinforcing policy (Policy
HS-1.1 Geotechnical
Reports).
6 Goals 1,
3, 4 and
5; Safety
and
Security;
Food,
Water,
Shelter;
Health
and
Medical
Extreme Heat
Work on finding multiple cooling
centers at different locations to cover
the entire geographic extent of the
City; pay additional attention to
disadvantaged communities and
vulnerable populations that do not
have adequate transportation to arrive
at the City’s downtown area.

City of
Patterson
Executive
Team,
Community
Development
Department,
Public Works
Department
$10,000 -
$100,000;
General
Fund
High 1-3 years New in 2022.
7 Goals 1,
3, 4 and
5;
Safety
and
Security
Flood
Develop a Public Awareness
Campaign on Flood Preparedness –
The City will organize a Social Media
Campaign that will run quarterly on
City of Patterson platforms to
advertise and promote evacuation
routes or pre-incident preparation for
flood hazards that can be done by the
public.

City of
Patterson
Executive
Team,
Community
Development
Department,
Public Works
Department
$10,000 -
$100,000;
General
Fund
High 1-3 years New in 2022.
8 Goals 1,
2, 3, 4,
and 5;
Safety
and
Security
Flood
The City shall prepare and adopt
Flood Management Plans and
practices aimed at protecting life and
property from the harmful effects of
flooding. The effort includes
establishing criteria for evaluating
whether new development should be
located in flood hazard zones,
City of
Patterson
Executive
Team,
Community
Development
Department,
$10,000 -
$100,000;
General
Fund
High 1-3 years
New in 2022. The City’s
Health and Safety Element
contains a mutuallyreinforcing policy (Policy
HS-2.1 Flood Control
Management).

8.1.c
Packet Pg. 340 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 35 identifying construction methods or
other methods to minimize damage if
new development is located in flood
hazard zones, and maintaining the
structural and operational integrity of
essential public facilities during
flooding.

Public Works
Department
9 Goals 1,
2, 3, and
5; Safety
and
Security
Flood
The City will implement flood hazard
mitigation prior to new development
by not approving new development in
areas subject to a 100-year flood
event, based on FEMA or on other
updated mapping acceptable to the
City, unless and until the flood hazard
has been mitigated. Mitigation may be
accomplished by one, or a
combination of, the following: 1)
compliance with Title 17 of the City’s
Municipal Code, Flood Hazard areas;
installation of flood control
improvements along Del Puerto Creek
and/or Salado Creek; and avoidance
of flood prone areas.

City of
Patterson
Executive
Team,
Community
Development
Department,
Public Works
Department
> $100,000;
General
Fund
High Ongoing
New in 2022. The City’s
Health and Safety Element
contains a mutuallyreinforcing policy (Policy
HS-2.16 Flood Hazard
Mitigation Prior to
Development).
10 Goals 1,
3, 4, and
5; Safety
and
Security
Wildfire
Develop a Public Awareness
Campaign on Wildfire Hazards – The
City will organize a Social Media
Campaign that will run quarterly on
City of Patterson platforms to
advertise and promote evacuation
routes, fire prevention, and preincident preparation that can be done by the public.

City of
Patterson
Executive
Team, City’s
Fire
Department
$10,000 -
$100,000;
General
Fund
Medium 1-3 years New in 2022.
11 Goals 1
and 5;
Safety
and
Security;
Transpor
tation,
Health
and
Medical
Wildfire
Consider utilizing prescribed and
monitored safe burn to reduce the
high fire threat to the west of the City.

City’s Fire
Department
10,000 -
$100,000;
General
Fund,
Department
budget
High 1-3 years New in 2022

8.1.c
Packet Pg. 341 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 36 12 Goals 1,
2, 3, 4,
and 5:

Safety
and
Security
Wildfire
The City shall require property owners
to remove fire hazards, including
vegetation, hazardous structures and
materials, and debris, as directed by
the Fire Department
City’s Fire
Department
> $100,000;
General
Fund
High Ongoing
New in 2022. The City’s
Health and Safety Element
contains a mutuallyreinforcing policy (Policy
HS-3.6 Fire Prevention).

8.1.c
Packet Pg. 342 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus 2022-2027 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan Annex F: City of Patterson
Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan | 2022-2027 Update Page 37 5 IMPLEMENTATION AND MAINTENANCE
Moving forward, the City will use the mitigation action table in the previous section to track the progress on the implementation of each project. Implementation of the plan overall is discussed in Section 6 in the Base Plan.

5.1 Incorporation into Existing Planning Mechanisms
The information contained within this plan, including results from the Vulnerability Assessment, and the Mitigation Strategy will be used by the City to help inform updates and the development of local plans, programs and policies. The Public Works Department and Engineering, Building, and Capital Projects Division may utilize the hazard information when implementing the City’s Capital Program and their CIP.

The City’s Engineering, Building, and Capital Project Department can incorporate the hazard information and vulnerability assessment into their Capital Projects Division efforts related to the planning, design, and construction of capital projects and the Community Development and Planning Divisions may utilize the hazard information when reviewing a site plan or other types of development applications. The City will also incorporate this MJHMP into the Safety Element of their General Plan, as recommended by Assembly Bill (AB) 2140.

As noted in Section 6 of the Base Plan, the LPT representatives from Patterson will report on efforts to integrate the hazard mitigation plan into local plans, programs and policies and will report on these efforts at the annual LPT plan review meeting.

5.2 Monitoring, Evaluation and Updating the Plan
The City will follow the procedures to monitor, review, and update this plan in accordance with Stanislaus County as outlined in Section 6 of the Base Plan. The city will continue to involve the public in mitigation, as described in Section 6.2.1 of the Base Plan. The Police Chief, Director of Engineering, Building, and Capital Projects, Public Works Director, City Planner, and Battalion Chief will be responsible for representing the City LPT in the County HMPC, and for coordination with City staff and departments during plan updates. The City realizes it is important to review the plan regularly and update it every five years in accordance with the Disaster Mitigation Act Requirements as well as other State of California requirements.

8.1.c
Packet Pg. 343 Attachment: Health & Safety Element Section - Updated MJHMP (Resolution No. 2023-17 Stanislaus County MJHMP Update) City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Ken Irwin, City Manager
MEETING DATE: April 18, 2023
ITEM NO: 8.2
SUBJECT: Approve First Reading and Introduction of Ordinance No. 867, Reading by Title Only, Waiving Further Reading, an Ordinance of the City Council of the City of Patterson, Amending (a) Section 6.28.070, Time for Filing, of Chapter 28, Firework Sales and Discharge, of Title 6, Health and Safety, and (b) Section 6.28.110, Fireworks stand specificationsRequirements, of Chapter 28, Firework Sales and Discharge, of Title 6, Health and Safety, of the Patterson Municipal Code to Allow for Extra Time in Applying to Operate and Erecting Firework Stands.

RECOMMENDATION
Motion to Approve First Reading and Introduction of Ordinance No. 867 Reading by Title Only, Waiving Further Reading, an Ordinance of the City Council of the City of Patterson, Amending (a) Section 6.28.070, Time for Filing, of Chapter 28, Firework Sales and Discharge, of Title 6, Health and Safety, and (b) Section 6.28.110, Fireworks stand specifications-Requirements, of Chapter 28, Firework Sales and Discharge, of Title 6, Health and Safety, of the Patterson Municipal Code to Allow for Extra Time in Applying to Operate and Erecting Firework Stands.

BACKGROUND
Currently, the Patterson Municipal Code requires that applicants for temporary permits to operate firework stands submit their applications no later than March 31st, and then erect their stands no earlier than June 26th. Several vendors of fireworks that conduct business in the City of Patterson have expressed that these dates are too early and have requested more time for both submitting applications and erecting the stands.

8.2 Packet Pg. 344
Staff recommends the City Council introduce the proposed Ordinance to amend the Patterson Municipal Code to provide the additional flexibility requested by firework vendors in the City within the limitations set forth in the State Fireworks Law (Health & Safety Code §§ 12500, et. seq.)

FISCAL IMPACT
There is no impact to the General Fund by adopting the proposed Ordinance.

POLICY ALTERNATIVES
The City Council’s options are:

1. Waive first reading, read by title only, and introduce the proposed Ordinance No. 867 without any changes;

2. Waive first reading, read by title only, and introduce the proposed Ordinance No. 867 with direction to staff for changes; or

3. Reject the Ordinance No. 867 entirely.

8.2 Packet Pg. 345
{CW126697.1}
ORDINANCE NO. 867

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PATTERSON, AMENDING THE FOLLOWING: (1) SECTION 6.28.070, TIME FOR FILING, OF CHAPTER 28, FIREWORK SALES AND DISCHARGE, OF TITLE 6, HEALTH AND SAFETY, AND (2) SECTION 6.28.110, FIREWORK STAND SPECIFICATIONSREQUIREMENTS, OF CHAPTER 28, FIREWORK SALES AND DISCHARGE, OF TITLE 6, HEALTH AND SAFETY, OF THE PATTERSON MUNICIPAL CODE TO

ALLOW FOR EXTRA TIME IN APPLYING TO OPERATE AND ERECTING

FIREWORK STANDS
WHEREAS, the City of Patterson (“City”) Municipal Code section 6.28.070 currently provides that applications for a temporary permit to operate a fireworks stand in the City must be submitted no later than the close of business on March 31st; and WHEREAS, Patterson Municipal Code section 6.28.110(B) currently states that fireworks stands may be erected in the City no earlier than June 26th; and WHEREAS, the City of Patterson City Council (“City Council”) finds it to be in the best interests of the City to allow more timing and flexibility to firework vendors both in submitting applications and erecting stands for the permitted sale of fireworks; and WHEREAS, the City Council seeks to adopt an ordinance amending the dates of Sections

6.28.070 and 6.28.110(B).

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PATTERSON ORDAINS AS FOLLOWS:

SECTION 1. Section 6.28.070 of the Patterson Municipal Code shall be amended to read as follows:

6.28.070 Time for filing.

A. Applications shall be made available by March 1st and shall be filed by the applicant no later than the close of business on June 1st, or, if offices are closed, the close of business on the next open business day. Applications submitted after the indicated deadline will not be accepted.

Failure to meet the requirements of the application for a permit will be reason for denial.

B. A city council-approved operator as set forth in Section 6.28.040(B) shall file an application for a permit not less than fifteen days prior to the event.

SECTION 2. Section 6.28.110(B) of the Patterson Municipal Code shall be amended to read as follows:

8.2.a
Packet Pg. 346 Attachment: Ordinance No. 867 (Fireworks Ordinance No. 867) {CW126697.1}
B. Fireworks stands may be erected no earlier than June 20th and shall be removed, along with any related litter, no later than July 7th of each year.

SECTION 3. Notice of the public hearing on the Ordinance was published in the ___________, a newspaper of general circulation; and notices of the public hearing on the proposed amendment to Sections 6.28.070 and 6.28.110(B) were mailed to all interested parties.

SECTION 4. This Ordinance shall become effective thirty (30) days from and after its final passage and adoption, and publication of the Ordinance shall occur in a newspaper of general circulation at least fifteen (15) days prior to its effective date, or a summary of the Ordinance published in a newspaper of general circulation at least five (5) days prior to adoption and again at least fifteen (15) days prior to its effective date.

The foregoing Ordinance was introduced at a regular meeting of the City Council of the City of Patterson, held on the 18th day of April 2023, by __________________, who moved its introduction, which motion was duly seconded by ___________________. Said Ordinance was given a second reading at a regular meeting of the City Council held on the ___, day of __________, 2023, and after such reading, _________________ moved its adoption, seconded by , and said Ordinance was thereupon adopted by the following roll call vote:

AYES:

NOES:

EXCUSED:

APPROVED:
_________________________
Michael Clauzel
Mayor of the City of Patterson
ATTEST:
___________________________
Aracely Alegre
City Clerk of the City of Patterson

8.2.a
Packet Pg. 347 Attachment: Ordinance No. 867 (Fireworks Ordinance No. 867) City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Aracely Alegre, City Clerk
MEETING DATE: April 18, 2023
ITEM NO: 9.A.1
SUBJECT: Appoint/Reappoint Three (3) Members to the Planning Commission for the Term of February 2023 - 2025 (Mayor Clauzel, Councilmember Farinha)

RECOMMENDATION
Motion to Appoint/Reappoint Three (3) Members to the Planning Commission for the Term of February 2023 - 2025 ( Mayor Clauzel, Councilmember Farinha)

BACKGROUND
The following applications were received and hereto attached:

1. Eric R. Bendix

2. Yenge Nzuzi Mahungu

3. Lynn Apland

4. Christine Dodd

5. Michael Sidhu

6. Gabriel Rodriguez

9.A.1
Packet Pg. 348
Commission/Committee/Board
City Clerk's Office
Application for Appointment • �ri�.3
· Time :'4 ;ta?•ro
(This is a Public Recor d Subject to D1 ure} Initials Ps"b Name of Commission/Committee/Board ------------------ Pla nning Commission -------- D_ Appointment __0_Reappointment Name of Applicant_
E
_r_i
c
_
R_._B_
e_n_
d_x i ____________________________ _
Residence Street Address_4
_10_D _
ow_itc
_h_
e_
r _D_
ri_v_
e ________ City Patterson Zip 95363
Mailing Address_
a
_
b_
o
_
ve _________________ City ________ _ Zip ___ _
(cell) (408)738-8888 Phone (home) (209)892-922 9 (work) _________ _ Email Addressebendix@g vni.c om Length of time at residence_1_ 9 _ _/21 _
y_
e_
a
_
rs ____ _
Employer ---------------- self ---------------------
Experience or Special Knowledge Pertaining to Area of Interest Kn owledge of area, and city's general pla n
Employment Experience
REAL TORj5 yea rs
Organization, Community and/or Public Service Experience Commun ity Emergency Response Team (CERT )
Education (high school, college, trade school or training) Note: There is no specific educational requirement
Drexel University towards Electrical Engineering degree Do you have any financial or professional interest or association related to this position? D_ves�No If yes, please explain. ________________________________ _

9.A.1.a
Packet Pg. 349 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) When are you available to attend this commission/committee/board regular and/or special meetings? As required
Please list three references with telephone numbers

1. Joshua Mendoza Phon (209)892-7175

2.Dale E Bledsoe Phon e (209)481-6031

3. Melissa Siebert Phon A (209(892-3154
A resume containing other pertinent information about yourself would be helpful to the City Council in evaluating your application (Optional).

APPLICATION CERTIFICATION: PLEASE READ BELOW BEFORE SIGNING.

I certify that the statements made by me in this application are true, complete, and correct to the best of my knowledge and belief. I understand that statements made are subject to verification and that any misrepresentation, fraud, or omission of material facts may result in denial of appointment/reappointment.

I hereby authorize representatives of the City of Patterson to contact organizations (including employers and schools) and individuals listed, for the purpose of establishing or verifying my qualifications and work history in connection with this application. I understand and acknowledge that such information will be used confidentially and for the purpose of appointment/reappointment decisions only.

I understand and hereby accept that if the City Council of the City of Patterson appoints/reappoints me to a City of Patterson Commission/Committee lBoard,I will serve without pay and will be subject to the filings of the Fair Political Practices Commission lstotement of Eanomic lnterest, Form 7il)1. I hereby further understand and accept that per City Ordinance No. 7L8, if I am appointed/reappointed, I will be required to pass a Department of Justice (DOJ) fi ngerprint (background) test.
p31s February 20,2023 Signature
File this application with: The City Clerk of
P.O. Box 557
e City of Patterson
l Plaza,2nd Floor
Patterson, CA 95353
Web Site www.ci.patterson.ca.us Email citvclerk@ci. patterson.ca.us Direct No. (209) 895-8014
e
(The City Clerk's Office will keep your application on file for one (1) year from the date stamped received)

9.A.1.a
Packet Pg. 350 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) Cltv Clerk's Office
oatJRecerved A-P.t -a3
Commission/Comm Fiuffi
Application for Appointment or Reappointment
(This is a Public Record Subject to Disclosure)
Name of Commission/Committee/Boa p6 Planning Commission Appointment Reappointment
Name of App licantYenge Nzuzi Mahungu
Residence Street Address1341 Buckskin Way
Mailing Add 1341 Buckskin
Phone (home (209) 752-2415 (cel
EmailAdd [email protected]
Patterson zip.95363
City Patterson 7i 95363
(wo
ngth of time at residence6
Employe; City of Patterson
Experience or Special Knowledge Pertaining to Area of lnterest Public Works employee
Geography Major
Long time Patterson resident since I was five years old Employment Experience
City of Patterson Public Works
Amazon Fulfi llement Center
Fastenal
Orga n ization, Com mu nity and/or Pu bl ic Service Experience Fundra
Donations
Education (high school, college, trade school or training) Note: There is no specific educational requirement
Bachelors degree in Geography
Do you have any financial or professional interest or association related to this position? lf yes, please explain
o

9.A.1.a
Packet Pg. 351 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) When are you available to attend this commission/committee/board regular and/or special meetings? Open availabillty on Thursday evenings
Please list three references with telephone numbers:

1. Raustand Nzoule phsns 209-338-7398

2. Sonia Delgado Ph 209-89s-8064

3. Victoria Paden Ph 2094814243
A resume containing other pertinent information about yourself would be helpful to the City Council in evaluating your application (Optional).

APPLICATION CERTIFICATION: PTEASE READ BELOW BEFORE SIGNING.

I certify that the statements made by me in this application are true, complete, and correct to the best of my knowledge and belief. I understand that statements made are subject to verification and that any misrepresentation, fraud, or omission of material facts may result in denial of appointment/reappointment.

I hereby authorize representatives of the City of Patterson to contact organizations (including employers and schools) and individuals listed, for the purpose of establishing or verifying my qualifications and work history in connection with this application. I understand and acknowledge that such information will be used confidentially and for the purpose of appointment/reappointment decisions only.

I understand and hereby accept that if the City Council of the City of Patterson appoints/reappoints me to a City of Patterson Commission/Committee /Board,l will serve without pay and will be subject to the filings of the Fair Political Practices Commission (Stotement of Economic lnterest, Form 7001. I hereby further understand and accept that per City Ordinance No. 778,ifI am appointed/reappointed, I will be required to pass a Department of Justice (DOJ) fingerprint (background) test.
s26212112023 Signature Yenge Mahungu
File this application with: The City Clerk of the City of Patterson P.O. Box 667
!Plaza,2nd Floor
Patterson, CA 95353
Web Site www.ci.patterson.ca.us Email [email protected] Direct No. (209) 895-8014
(The City Clerk's Office will keep your application on file for one (1) year from the date stamped received)

9.A.1.a
Packet Pg. 352 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) Commission/Com
Tlme
Appl ication for Appointmen ea ppo
(This is a Public Record Subject to Disclosure)
Name of Com miss!on/Com mitteelBoa fir"trJ LtJG r,lis
&Appointment
Ofrlce
e
ppointment
Name of Appl L
U
Residence Street Address 2,lo rd ER fil City
,4tttc
Mailing Addr
Phone (hom
e Lo
e)
?silJ
(work)-
EmailAddress €> ngth of time at residence e0
Employer S(ue
Exp erience or Special Knowled Pertain
fr(- .fR lilk ing to aofl
Employment
(0rJCr-(
Experience
Jc r-f,orJ flttO tf.tt EL[t tortr 6*{- Ffrcctfttl
Organization, Community a nd/or Public Service nce
4 c
Education (high school, college, trade school or training) N
rn60adfo {Dv.rcft AU-E&f- -
Do you have any financial or professional interest or association related to this position? -[Lt"rq lf yes, please exp
No
t*rrrJo9 A6a st- 1.3

9.A.1.a
Packet Pg. 353 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) When are you available to attend this commission/committee/board regular and/or special meetings? ,4rf /v)dlZfr E:0 Please list three with telephone numbers:

Gnt r- Phone 6 i3 l,F /
Phone
Phone
Gra
A resume containing other pertinent information about yourself would be helpful to the City Council in evaluating your application (Optional).

APPLICATION CERTIFICATION: PLEASE READ BETOW BEFORE SIGNING.

I certify that the statements made by me in this application are true, complete, and correct to the best of my knowledge and belief. I understand that statements made are subject to verification and that any misrepresentation, fraud, or omission of material facts may result in denial of appointment/reappointment.

I hereby authorize representatives of the City of Patterson to contact organizations (including employers and schools) and individuals listed, for the purpose of establishing or verifying my qualifications and work history in connection with this application. I understand and acknowledge that such information will be used confidentially and for the purpose of appointment/reappointment decisions only.

I understand and hereby accept that if the City Council of the City of Patterson appoints/reappoints me to a City of Patterson Commission/Committee/Board, I will serve without pay and will be subject to the filings of the Fair Political Practices Commission (Stotement ol Economic lnterest, Form 7001. I hereby further understand and accept that per City Ordinance No. 7L8, tf I am appointed/reappointed, I will be required to pass a Depa rtment of Justice (DOJ) fingerprint (background) test.
references'
1, F zrz

2. 3. o
Date ,J-JA.-dJ Signature
File this application with: The City Clerk
P.O. Box 667
t Plaza,2nd Floor
Patterson, CA 95363
City Patterson
Web Site www.ci.oatterson.ca. us Ema i I [email protected]'ca'us Direct No. (209) 895-8014
(The City Clerk's Office will keep your application on file for one (1) year from the date stamped received)

9.A.1.a
Packet Pg. 354 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) Commission/Comm
Ciw Clerk's Oftlce
n te R.c.t e6 ?- aa'?3 Hn@.
lnhlab flnA
Application for Appointment or Reappointment
{}his is a Public Record Subject to Disclosirre)
Name of 6rrn rri (Trrnission
M oroointrnent nt
Name of
Residence Street
Christine Dodd
850 Toyon Ln.

Mailing Address 850 Toyon Ln.
c Patterson p JlPdterson
(work)-
of tirne at residenc" 3 years
CA
Phone (home
EmailAdd christi nebays92 @ gmail. mm
{ce (20e1499-8338
Employer Self-employed
Experience or Special Knowledge Pertaining to
I have lived in Patterson the majority of my life
Area of lnterest
and recently had a child. lwas involved in leadershi
in school. lam willing to serve my cornmunity. ldo a lot of biking, and driving around town. I decu6d thd indead of complainirg l shor.rld take aGion ard tryto become involvod in stupirg Pan€f$on as it 910$Is.

Employment Experience
PJ US D Teacher 201 9-n22, Substitute
Iriobile
2U 61 2A 1 8 lE:022- present,
Teacher 2016-m18, Associate at Enloe in 2015-2016,
Tractor/Forklift Driver cluring Summer Aprklot Harvest
O rga nization, Co mm u nity a nd/or P ublic Se rvice Expe rience Trustees Committee ldember at Patterson Federated Churcfr 2018-present Sunday SchoolTeacher at Patterson Federated Church 2019-present Education {high school, college, trade school or training) Note: There is no specifrc educational requiremcnt
Gradualed with General Education Teaciing credontial lrorn stanislals stare 2019 Graduated wiih &S in Nutrition and Food Sciace lrom CHco State 2015 Gracluated rrom Pailerson High Scfnol 20I0
Do you have any financial or professional interest or association related to this position? lf yes, please explain
n r",-EL*o

9.A.1.a
Packet Pg. 355 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) When arc you availablc to attend this commission/committee/board rcaular and/or special meetin3s? I am usully available a(ry day, as lorg as I am able to tind childcare.

Please list three refercnccs with telephonc numbers:

1. Kevin Debler 5-f

2. Teresa Murilh vA- * 0a a aJ? I c

3. Stacey Albrecht
A resurne contalnlng other pertinent inforrnation about yourself would be helpfulto the City C.ouncll ln evaluatitrg your application (Optional).

APruCATION CERTIFICATION: PLEASC BEAD BELOW BEFOBE SIGT{ING.

I certifythatthe statements made by me in this application are true, comdetg and correct to the best of my knowledgc and belief. I underctand that statements made are subjectto verification and that any misrepresentation, fraud, or omisslon of materlal facts may result ln denial of appolntmentfreappolntment.

I hereby authorlre representatives of the City of Patterson to contact organizations (including employers and schools) and indMduals listed, for the purpos€ of establishing or verifying my qualifications and work history in connestion with this application. I understand and acknowledge that such information will be used confidentially and for the purpose of appointment/rcappointmert decisions only.

I understand and harcby acccpt that if the Oty Councll of the Clty of Patterson appoints/reappoints me to a City of Pattercon Commission/Committee/Board, I will senre without pay and will be subject to the filings of the Fair Political Practiccs Commission lStotnpnt ol Ecupntk lfurcst, Form 7fi1. I hcreby further understand and accept that per Gty Ordinance No.71E, il I am appointed/reappointed, I will be required to pass a Department of .lustice (DOJ) fingerprint ( badqrou nd ) test.
0ate Signature
File this application with: The City Clerk of the City of Patterson P.O. Box 667
l Plaza, 2nd Floor
Patterson, CA 95363
Web SIte www.ci.patteFon.ca.us Emall [email protected] Direct No. (2Gtl 895€014
B
(The Oty Clcrk s Officc wlll keep your applicatlon on fllc for onc (1) year from thc datc stamped raccivcd)

9.A.1.a
Packet Pg. 356 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) Clty Clerk's Office
Commission/Commi
Application for Appointment or Reappointment
(This is a Public Record Subject to Disclosure)
Name of Commission/Committee/Board Planning Commission
M-Appointment ppointment
a-43 -33
Name of Applica MichaelSidhu
Residence Street Address 625 Snow Creek Lane
Mailing Add 625 Snow Creek Lane
Phone (home) 916-990-5624
City Patterson, CA Zip 95363
Patterson, CA 7i
of time at residencg 1 year and I months
(cel
Email Addre55 michaelsidhul ail.com
916-990-5624
Employer California Energy Commission
Experience or Special Knowledge Pertaining to Area of lnterest I believe my transportation planning background can help the City develop sustainable long range performance measures, strategies and goals that will help Patterson's downtowns economy as well as preserve its community and historic values. At Caltrans, I held public workshops to learn more about issues and projects impacting various local and disadvantaged communities across the state Employment Experience
I was an Assistant Transportation Planner at the Sacramento Area Council of Governments and focused on improving transit ridership and identified ways to make com plete streetq: At Caltrans I was an Associate Transportation Planner and developed the California Transportation Plan (CTP) 2040. Cunently I am an Energy Commission Specialist, and work with utilities to build up California's electricity reserves.

Organization, Community and/or Public Service Experience At Caltrans, I facilitated the CTP Public Advisory Committee to hold discussions with city leaders and stakeholders to help develop collaborative goals and performance measures. Currently, I am in the City of Patterson's Downtown Revitalization Committee, where I assist to institute guidelines, review feasibility studies, and visioning reports.

Education (high school, college, trade school or training) Note: There is no specific educational requirement
B.A. Environmental Studies & Economics from University of California Santa Cruz Do you have any financial or professional interest or association related to this position? E ,", El * lf yes, please explain
o
lnltlak.&&-
p 95363

9.A.1.a
Packet Pg. 357 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) When are you available to attend this commission/committee/board regular and/or special meetings? I am available everyday after work. I am get off work at 5PM.

Please list three references with telephone numbers:

1. Greg Chew Phone (916) 340-6227

2. GabrielCorley Ph (916) 6s3-1305
3 Ryan Ong Ph 1 203-9326
A resume containing other pertinent information about yourself would be helpful to the City Council in evaluating your application (Optional).

APPIICATION CERTIFICATION: PLEASE READ BELOW BEFORE StGNtNG.

I certify that the statements made by me in this application are true, complete, and correct to the best of my knowledge and belief. I understand that statements made are subject to verification and that any misrepresentation, fraud, or omission of material facts may result in denial of appointment/reappointment.

I hereby authorize representatives of the City of Patterson to contact organizations (including employers and schools) and individuals listed, for the purpose of establishing or verifying my qualifications and work history in connection with this application. I understand and acknowledge that such information will be used confidentially and for the purpose of appointment/rea ppointment decisions only.

I understand and hereby accept that if the City Council of the City of Patterson appoints/reappoints me to a City of Patterson Commission/Committee /Board,l will serve without pay and will be subject to the filings of the Fair Political Practices Commission (Stotement of Economic lnterest, Form 700). I hereby further understand and accept that per City Ordinance No. 778, if I am appointed/reappointed, I will be required to pass a Department of Justice (DOJ) fingerprint (backgrou nd) test.
s*s 02-22-23 Signature 4/l J ,-/t, -,
File this application with The City Clerk of the City of Patterson P.O. Box 667
LPlaza,2nd Floor
Patterson, CA 95363
Web Site www.ci. patterson,ca.us Email [email protected] Direct No. (209) 895-8014
(The City Clerk's Office will keep your application on file for one (1) year from the date stamped received)

9.A.1.a
Packet Pg. 358 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment)

MICHAEL SIDHU
625 Snow Creek Ln Patterson, CA 95363 o [email protected] February 22,2023
City Hall
I Plaza
Patterson, CA 95363
To whom this may concern,
Please consider my application for a seat opening on the City of Patterson's Planning Commission. I have experience in instituting guidelines and stakeholder outreach during my time at the Sacramento Area Council of Governments (SACOG), California Department of Transportation (Caltrans) and the California Energy Commission (CEC).

At SACOG, I collected and reviewed data from other state transit agencies for the Regional Bike & Pedestrian Funding Program grant, which secured $500k in funding. I prepared briefings to inform senior management with recommendations on which bicycle and pedestrian counter technologies to acquire.

At Caltrans, I coordinated the policy advisory committee for the California Transportation Plan 2040 (CTP) to collaborate with internal and extemal stakeholders to help guide statewide policies. I conducted public workshops for the CTP to solicit information required to develop reports and regulations. I assisted in the development of the Caltrans Vulnerability Assessment Reports by performing technical evaluations of climate change impacts.

At CEC, I have worked on the Renewable Portfolio Standard (RPS) Online System certifring renewable energy technologies in order for them attain renewable energy credits. I supported the Home Energy Rating System (HERS) Programs enforcement efforts through investigating suspected non-compliant building permits. Currently, I work on implementing the Demand Side Grid Support (DSGS) Program by developing tools to process incentives being offered to electric customers providing load reduction and back up generation during extreme heat events.

The opportunity to display my experience in transportation and city planning as well as program implementation excites and motivates me to come to work every day. It would be an honor to be a part of the City of Patterson's Planning Commission. I appreciate your time and I look forward to hearing from you.

Sincerely,
Michael Sidhu
4n ur"-

9.A.1.a
Packet Pg. 359 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) Michael Sidhu
(916) 990-5624. [email protected] .625 Snow Creek Ln. Patterson, CA 95363

WORKE)GERIENCE
California Energr Commission, Sacramento, CA September 2019 - Present Energt Commission Specialist I & il
o Assisted in the implementation of the Demand Side Grid Support (DSGS) Program by developing tools to process incentives being of[ered to elechic customers. o Led a team conducting research into impact of providing local authority having jurisdictions with the ability to process building permits that abide by the energy and building codes. o Retrieved and scientifically evaluated data and information from available sources including Home Energy Rating System Providers, local agencies, and utilities. o Identified issues, areas of improvements and compared energy efficiency in California homes for the Home Energy Rating System (I{ERS) Program.
o Collaborated with CEC staffand stakeholders to develop processes to quantifr the enerry savings and carbon emission reductions achieved through increased Energy Code compliance. o Reviewed California's Renewable Portfolio Standard (RPS) certification for renewable energy generation facility applications to ensure program conformance.
o Facilitated revisions to the RPS Eligibility Guidebook by preparing amendment resolution memos for management review and approval.
o Evaluated technologies to inform policy decisions affecting the RPS program certification eflorts. o Developed a remote working platform by developing a Microsoft Teams and SharePoint structure for staff to acc€ss files, communicate effectively and ensure equitable workload distribution. o Contributed to the continued design, development, and testing of certification functionality within the RPS Online System by identifuing functionality needs and reviewing website design.

Caltrans, Sacramento, CA October 2014 - September 2019
As s o c iat e Tr anspor tati on P lanner
. Updated the Climate Registry Information System to report greenhouse gas emissions emitted from Caltrans' facilities and equipment to hack the progress to reduce its carbon footprint. o Developed vulnerability assessments for each of the twelve districts to identifu climate change stressors that affect specific regions statewide and provide adaptation strategies to offset adverse impacts. o Coordinated and led the effort in scoring adaptation planning grants to identifr which stakeholders get a share of the $6 million-dollar award for the last cycle of Califomia Senate Bill I (2017) funds. o Processed month end accounts payable, accounts receivable invoices and progress reports to ensure contracts are meeting their deadlines and providing deliverables in a timely manner. o Coordinated the policy advisory committee meetings for the California Transportation Plan.

Sacramento Area Council of Governments, Sacramento, CA July 2013-October2014 As s i stant Tr ans portat i on P I anner
o Prepared an executive summary with analysis of results gathered from Connect Card pilot testers. o Created pilot surveys to gather feedback from the public on the Connect Card pilot test experience ofonboard complex electronic card readers. o Secured a $500k successful grant application for the Bicycle and Pedestrian funding program for the Regional Bicycle and Pedestrian Data Collection project. o Edited the SACOG Metropolitan Transportation Improvement Plan database for the Caltrans Highway Bridge Program adjusting project descriptions, fiscal year dates and funding amounts.

COMMITTESS
Downtown Revitalization Committee, City of Patterson, CA

EDUCATION
B.A. Economics end Environmental Studies from UC Santa Crua Santa Cruz, CA February 2022-present
June2012

9.A.1.a
Packet Pg. 360 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) fitv f!:rk's Oftle
[jr,- i:e(eive o 2 '3?t B
a!n:t -{;el.Bg- Commission/Comm 6Oa [Gla.r' A*
Application for Appointment or Reappointment
(This is a Public Record Subject to Disclosure)
N ame of Com mission/Committee/Board
Residence Street Address r68
Appointment
Name of Applicant
Mailing Addr
Phone (home)
Email Address
Reappointment
Arl,'o L"*- Ul,,* zipq{3G3
zip qfr63
C
cit
(work
h of time at residence 7 /t4
t
v ?,1{""
(cell)
Employer 5l oI it*-i,.

Ex erience o Special Knowledge Pertaining to Area of lnterest Em loym en t Experience
Organ ization, Comm u nity and/or Public Service Experience Education (high school, college, trade school or training) There ls no ecific educational requirement
Do you have any financial or professional interest or association related to this position? -yes
.k fVo
lf yes, please explain

9.A.1.a
Packet Pg. 361 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment) When are you available to attend this commission/committee/board regular and/or special meetings? DI
1 2
3 t^- itrd l:^! tL-^^ -^L^-^ ii5L LiiiEc icicie .,.:+L r-^!^^L^.-- wi Lri Leiepnoi-ie -,.*l numoeis Phone
Phone
Phon
A resume containing other pertinent information about yourself would be helpfulto the Citv Council in evaluating your application (Optional),
APPLICATIOIU CERTIFICATION: PLEASE READ BELOW BEFCRE S!GN|NG.

I rprtifv thet thp stetcmpnt( mado hrr ma in f hi< :nnlirrtian a16 {'rr r6 ramnlaia :nr.l rarrarl' fn iho }ract nf mrr i, s!, vvr.rPr! rv rrrr VLJL vr rrry knowledge and belief. I understand that statements made are subject to verification and that any misrepresentation, fri! r.l ^r a{ mr+a.irl f-^+.
--,,
-^^,,1+ ;^ ,J^-;-l ^f ^^-^i^}*^-+ /-^^^^^r-r*^^-
, v' rrrqLError ro!LJ rrtoy rqsurr ilr uEIror vr dpPLrlriLrllEtlL/ledPpulrrLIllcIlL, I hereby authorize representatives of the City of Patterson to contact organizations (including employers and schools) and individuals listed, for the purpose of establishing or verifying my qualifications and work history in connection with this application. I understand and acknowledge that such information will be used confidentially and for the pur"pose of appointment/reappointment decisions only.

I understand and hereby accept that if the City Council of the City of Patterson appcints,/reappoints me to a City of Patterson Commission/Committee/Board, I will serve without pay and will be subject to the filings of the Fair Politica! Practices Commission (Statement of Economic lnterest, Form 700\. I hereby further understand and accept that per City Ordinance No. 718,if I am appointed/reappointed, I will be required to pass a Department of Justice (DOJ) fingerprint (background) test
Date Signatu re
File this application with The City Clerk of
P.O. Box 667
e City of Patterson
L Plaza,2rrd Fioor
Patterson, CA 95363
Web Site www.ci.patterson.ca. us Emaii citvclerk@ci. patterson.ca.us Direct No. (209) 895-8014
(The City Clerk's Office will keep your application on file for one (1) year from the date stamped received) 5to
l -is9.A.1.a
Packet Pg. 362 Attachment: Planning Commission Applicants (6) (Planning Commission Appointment)

← All documents from this meeting