Cities Index.
Agenda packet, regular meeting

Patterson City Council
November 7, 2023

Document
Agenda packet, regular meeting
Meeting
November 7, 2023
Body
Patterson City Council
Pages
1
Original file
80.2 MB
Text extracted from the city's file for reading and search. Open the original on pattersonca.iqm2.com. That file is the official record.

City of Patterson Page 1 Updated 11/2/2023 2:52 PM
Agenda
City of Patterson
City Council Regular Meeting
November 7, 2023
7:00 PM
Council Chambers
1 Plaza
Patterson, CA 95363

PUBLIC MEETING GUIDELINES
City of Patterson City Council meetings are conducted in person at City Hall Council Chambers. As a courtesy, and technology permitting, members of the public may continue to participate virtually. However, the City cannot guarantee that the public’s access to teleconferencing and translating technology will be uninterrupted, and technical difficulties may occur from time to time.

PLEASE NOTE: PUBLIC PARTICIPATION VIA ZOOM WILL BE TEMPORARILY LIMITED. COMMENTS VIA ZOOM ARE TEMPORARILY SUSPENDED. PUBLIC COMMENTS DURING THE MEETING MUST BE MADE IN PERSON. MEMBERS OF THE PUBLIC MAY STILL VIEW THE MEETING VIA ZOOM.

MEMBERS OF THE PUBLIC MAY PARTICIPATE IN THE MEETING IN PERSON OR VIA TELECONFERENCE BY CALLING 1-669-900-9128, MEETING ID: 693 538 4239, PASSWORD: 20995363. JOIN FROM A PC, MAC, IPAD, IPHONE, OR ANDROID DEVICE BY USING THIS URL:
https://us02web.zoom.us/j/6935384239?pwd=ZmZwMFdYajRsTjlKTnNTamZCWXFXdz09 The meeting will be televised or available for public viewing on comcast cable channel 7 on the following days: Wednesday at 3:00 p.m., Friday at 8:00 p.m. and Saturday at 12:00 p.m. Or watch on internet Vimeo link: https://vimeo.com/channels/patterson/ To access written translation during the meeting, please scan the QR Code or click this link:

Para acceder a la traducción escrita durante la reunión, escanee el código QR o haga clic en este enlace:
https://attend.wordly.ai/join/HSEU-6978
Choose Language and Click Attend / Elija el idioma y haga clic en Asistir Use a headset on your phone for audio or read the transcript on your device.

Use audífonos en su teléfono para audio o lea la transcripción en su dispositivo.

City of Patterson Page 2 Updated 11/2/2023 2:52 PM
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk at (209) 895-8012. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. [28 CFR 35.102-35.104 ADA Title II] The City Council agenda and supporting public documents are available for viewing in City Hall, Administration Department, 1 Plaza, 2nd Floor, Patterson, California, during normal business hours. The City Council agenda and supporting public documents are also available online on the City web site www.ci.patterson.ca.us listed under Popular Links “City Council Agendas” or please call or email the City Clerk at (209) 895-8012 or [email protected] If you wish to be notified of future City Council Meetings, please visit our web site www.ci.patterson.ca.us go to Popular Links “City Council Agendas” and Subscribe to “RSS” ═══════════════════════════════════════════════════════════════

1. Call to Order

2. Pledge of Allegiance

3. Statements of Conflict

4. Items from the Public
Any member of the audience desiring to address the Council regarding a matter on the agenda, please raise your hand or step to the podium at the time the item is announced by the Mayor. The public wishing to address the Council on items that do not appear on the agenda may do so; however, Council will take no action other than referring the item to staff for study and analysis and may place the item on a future agenda (Resolution 92-25) In order that all interested parties have an opportunity to speak, any person addressing the Council will be limited to a maximum of five (5) minutes unless the Mayor grants a longer period of time (Resolution 92-25)
Please State Your Name and City for the Record.

5. Proclamation

5.1. Proclamation - Public Works Deputy Director Andrade - (Mayor Clauzel)

6. Consent Calendar
All items are approved by a single action. Any item may be removed from the Consent Calendar for separate discussion upon request from a member of the Public, Staff and/or Councilmember.

6.1. Motion to Waive Readings - All Readings of Ordinances and Resolutions, Except by Title are hereby waived.

6.2. Approve Minutes of Special Meeting/Closed Session - October 3, 2023 (6:00 PM)

6.3. Approve Minutes of Regular Meeting - October 3, 2023 (7:00 PM)

6.4. Approve Minutes of Regular Meeting - October 17, 2023 (7:00 PM) City of Patterson Page 3 Updated 11/2/2023 2:52 PM

6.5. Approve Resolution No. 2023-52 Accepting the Public Improvements for Villages of Patterson, Cromwell Shire Unit 2 onsite as Complete; Authorizing the City Clerk to File the Notice of Completion; and Begin the One-Year Warranty.

6.6. Approve the proposal from Melton Design Group, Inc. for the Centennial Park Conceptual Design, Final Design, and Community Center Preliminary Design, authorize staff to enter into a negotiated Consultant Agreement with a not to exceed cost of $535,172.00 and authorize the Finance Department to make the necessary budget adjustments for Fiscal Years 2023-24.

6.7. Accept all bids for the South Park Improvements, and award construction to Sinclair General Engineering Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to make the necessary budget adjustments for Fiscal Year 2023-24.

6.8. Approve the proposal from Provost & Pritchard Consulting Group for the Ward Avenue Overlay Phase II Project and section of Non-Potable Water Main, authorize staff to enter into a negotiated Consultant Agreement with a not to exceed cost of $94,066.00.

7. Presentation

7.1. Public Works Department - Presentation to Honor Patterson’s Hometown Heroes for Year 2022-2023 (Public Works Director Willett)

8. Public Hearing

8.1. Planning Department - Approve Entering into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC and authorize the City Manager or his Designee to execute the agreement.

Staff Report: Community Development Director Stice
Mayor: Open/Close Public Hearing
Council: Motion to Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC and authorize the City Manager or his Designee to execute the agreement.

8.2. Planning Department - Approve the CEQA Addendum to the 2010 General Plan EIR for the Parks and Recreation Master Plan (PRMP) and adopt the Parks and Recreation Master Plan.

Staff Report: Community Development Director Stice
Mayor: Open/Close Public Hearing
Council: Motion to Approve the CEQA Addendum to the 2010 General Plan EIR for the Parks and Recreation Master Plan (PRMP) and adopt the Parks and Recreation Master Plan.

City of Patterson Page 4 Updated 11/2/2023 2:52 PM

9. Public Comment/Action Item

9.1. Fire Department - Authorize Staff to abate Public Nuisance, by removing Weeds, Dirt, Rubbish, and/or Rank Growth as pursuant to the provisions of Ordinance No. 243 and Ordinance No.704, as defined in Chapter 6.16 of the Patterson Municipal Code. Authorize Staff to begin the bid process utilizing licensed contractors (Resolution No. 2023-53 Clean - Up Process) Staff Report: Interim Fire Chief Frye
Mayor: Open/Close Item to Public Comment
Council: Approve Resolution No. 2023-53

10. City Staff Reports

10.1. Planning Department - Approve Resolution No. 2023-54, A Resolution of the City of Patterson Calling for a Special Mail Ballot Election on April 9, 2024 to Confirm the Zacharias-Baldwin Master Plan Reorganization, Requesting Election Services from Stanislaus County, and Authorizing the Filing of Written Arguments.

Staff Report: Community Development Director Stice
Council: Motion to Approve Resolution No. 2023-54, A Resolution of the City of Patterson Calling for a Special Mail Ballot Election on April 9, 2024 to Confirm the Zacharias-Baldwin Master Plan Reorganization, Requesting Election Services from Stanislaus County, and Authorizing the Filing of Written Arguments.

11. City Council Reports
A. Reappoint a Member to the Stanislaus County Measure L Citizens Oversight Committee for the Term 2023 - 2026

11.A.1.Motion to Reappoint Peter P. La Torre Jr. MD to the Stanislaus County Measure L Citizens Oversight Committee for the Term 2023 - 2026.

B. Councilmember Alves
. Stanislaus Homeless Alliance (Councilmember Roque alternate) . Stanislaus County Hazardous Waste Advisory Committee (Councilmember Farinha alternate)
C. Councilmember Romero
. Westside Health Care Task Force (Councilmember Alves alternate) City of Patterson Page 5 Updated 11/2/2023 2:52 PM
D. Councilmember Farinha
. San Joaquin Valley Air Pollution Control District (Councilmember Romero alternate)
E. Mayor Pro Tem Roque
. (EDAC) Stanislaus County Economic Development Action Committee (Mayor Clauzel alternate)
. Workforce Development Board (Mayor Clauzel alternate) F. Mayor Clauzel
. Stanislaus County Mayor's Meeting
. StanCOG (Mayor Pro Tem Roque alternate)
. League of California Cities (Councilmember Farinha 1st alternate, Councilmember Alves 2nd alternate)

12. Other Matters

13. Adjournment

DECLARATION OF POSTING
I, Aracely Alegre, City Clerk of the City of Patterson, California do hereby declare that the foregoing notice was posted on the Bulletin Board at City Hall, 1 Plaza, Patterson, California on November 2, 2023.

The Agenda is also posted for public view on the Bulletin Boards of the Hammon Senior Center, 1033 W. Las Palmas, Patterson, the Patterson Branch Library, 46 N. Salado Avenue, Patterson, and the City of Patterson City Web Site www.ci.patterson.ca.us Aracely Alegre, City Clerk
City of Patterson
Direct No. (209) 895-8012
Email [email protected]
City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Michael Clauzel,
MEETING DATE: November 7, 2023
ITEM NO: 5.1
SUBJECT: Proclamation - Public Works Deputy Director Andrade - (Mayor Clauzel) This item is informational. No action needed.

5.1 Packet Pg. 6
Proclamation

A PROCLAMATION OF THE CITY COUNCIL OF

THE CITY OF PATTERSON HONORING

ROBERT ANDRADE
ON HIS RETIREMENT AND HIS DEDICATED 32-YEARS OF

SERVICE TO THE CITY OF PATTERSON
WHEREAS, Robert Andrade, Public Works Deputy Director of Operations & Maintenance, retires on November 15, 2023, after completing outstanding service to the City of Patterson since 1991; and WHEREAS, Robert Andrade, held several positions in the Public Works Department from September 17, 1991, to November 15, 2023; and
WHEREAS Robert Andrade began his career on September 17, 1991, with the City of Patterson as a part-time Maintenance Worker I in the Public Works Department and September 11, 1993, he became full-time employee and continued his career with the city; and WHEREAS Robert Andrade was promoted to Public Works Supervisor on May 1, 2005, and on January 1, 2007, was promoted to Public Works Deputy Director of Operations and Maintenance; and WHEREAS, Robert Andrade, during his years of service made many lasting contributions to the Public Works Department; and
WHEREAS, Robert provided excellent leadership and service to the City of Patterson, including the implementation of the City’s successful Cross-Connection Program, served as Chairman of the City’s Safety Committee for over a decade, and managed all operations and maintenance divisions (Urban Forestry, Collections, Water, Streets, Fleet Services, Electrical & Instrumentation, Buildings, and Parks) of the Public Works Department as Deputy Director. Robert has worked endless hours to ensure that the community of Patterson had safe water, clean and well-maintained streets and parks and contributed to the quality of life for the Patterson community; and
WHEREAS, Robert Andrade, earned the respect of all staff and colleagues at the City of Patterson for his dedication, professionalism, leadership, and hard work; and WHEREAS, the City Council of the City of Patterson does hereby take immense pleasure in recognizing the significant professional achievements of Robert Andrade, and herewith expresses its sincere gratitude for the invaluable contributions he has made to the City of Patterson.

NOW, THEREFORE, BE IT RESOLVED, that I, Michael Clauzel, Mayor of the City of Patterson, do hereby honor Robert Andrade for his retirement and hereby express the City’s deepest appreciation to Robert Andrade for his outstanding and dedicated 32-years of service to the City of Patterson.

IN WITNESS THEREOF, I have
hereunto set my hand and caused the
seal of the City of Patterson to be
affixed on this 7th day of November 2023.
____________________________
Michael Clauzel, Mayor

5.1.a
Packet Pg. 7
Attachment: PROCLAMATION - ROBERT ANDRADE - 2023 (Proclamation - Public Works Deputy Director Andrade - (Mayor Clauzel)) City of Patterson Page 1 Updated 10/4/2023 10:08 AM
City Of Patterson
Special Meeting/Closed Session Minutes
October 3, 2023
City Manager
Ken Irwin
City Attorney
Nubia Goldstein
Deputy City Attorney
Douglas White www.ci.patterson.ca.us
Mayor
Michael Clauzel
City Council
Shivaugn Alves, District A
Jessica Romero, District B
Dominic Farinha, District C
Carlos Roque, District D
City Clerk
Aracely Alegre

1. Call to Order
Attendee Name Title Status Arrived
Michael Clauzel Mayor Excused
Shivaugn Alves District A Present
Jessica Romero District B Excused
Dominic Farinha District C Present
Carlos Roque District D Present
The special (Closed Session) meeting of the City Council of the City of Patterson was called to order in the City of Patterson, City Council Chambers, 1 Plaza, Patterson at 6:01 p.m. by Mayor Pro Tem Roque.

City Staff Present:

1. City Manager Irwin

2. City Attorney Goldstein

3. Human Resources Director Guillory-Jones
The City Council will adjourn to Closed Session to address the following:
a. Recreation and Community Services Director Appointment - Pursuant to Government Code Section 54957. b. Interim Fire Chief Appointment - Pursuant to Government Code Section 54957. c. Liability Claims (Gov. Code, § 54956.95) Claimant: Cari McCormick Agency claimed against: All California public entity employers participating in CalPERS d. Conference with Legal Counsel - Existing Litigation (Gov. Code, § 54956.9) Name of Case: Central Valley - Sierra Associates v. City of Patterson, Stanislaus Superior Court Case No.: CV-23-005444

6.2 Packet Pg. 8
Minutes Acceptance: Minutes of Oct 3, 2023 6:00 PM (Consent Calendar) City of Patterson Page 2 Updated 10/4/2023 10:08 AM

2. Statements of Conflict
None.

3. Items from the Public
None.

4. Adjourn to Closed Session
At 6:03 p.m. there being no items from the public, the Patterson City Council adjourned to Closed Session.

5. Report from Closed Session (if any)
At 6:59 p.m., Mayor Pro Tem Roque announced the following:

Regarding Item No. 1a - No reportable action
Regarding Item No. 1b - No reportable action
Regarding Item No. 1c - Council has denied the claim with a 3-0 vote Regarding Item No. 1d - No reportable action

6. Adjournment
There being no further business, the special (Closed Session) meeting of the City Council of the City of Patterson of October 3, 2023 was adjourned at 6:59 p.m.

Approved by the Patterson City Council on November 7, 2023.

6.2 Packet Pg. 9
Minutes Acceptance: Minutes of Oct 3, 2023 6:00 PM (Consent Calendar) City of Patterson Page 1 Updated 10/25/2023 11:35 AM
City Of Patterson
Regular Meeting Minutes
October 3, 2023
City Manager
Ken Irwin
City Attorney
Nubia Goldstein
Deputy City Attorney
Douglas White www.ci.patterson.ca.us
Mayor
Michael Clauzel
City Council
Shivaugn Alves, District A
Jessica Romero, District B
Dominic Farinha, District C
Carlos Roque, District D
City Clerk
Aracely Alegre

1. Call to Order
Attendee Name Title Status Arrived
Michael Clauzel Mayor Late 7:43 PM
Shivaugn Alves District A Present
Jessica Romero District B Excused
Dominic Farinha District C Present
Carlos Roque District D Present
The regular meeting of the City Council of the City of Patterson of October 3, 2023, was called to order in the City of Patterson, 1 Plaza, Patterson at 7:01 p.m. by Mayor Pro Tem Roque.

City Staff Present:

1. City Manager Irwin

2. City Attorney Goldstein

3. Human Resources Director Guillory-Jones (remote)

4. Public Works Management Analyst Renfrow

5. Environmental Compliance Specialist Laurel

6. IT Manager Ford

7. Public Works Director Willett

8. Fire Chief Gregory

9. Director of Engineering/Building Ulloa (remote)

10. Diana Hernandez (remote)

11. Finance Director Riedeman

12. Police Chief Clayton

13. Code Enforcement Alysia

14. City Planner Andrews (remote)

15. Community Development Director Stice (remote)

16. Public Works Deputy Director Andrade (remote)

17. City Clerk Alegre

6.3 Packet Pg. 10
Minutes Acceptance: Minutes of Oct 3, 2023 7:00 PM (Consent Calendar) City of Patterson Page 2 Updated 10/25/2023 11:35 AM

2. Pledge of Allegiance

3. Statements of Conflict
None.

4. Proclamation

4.1. Proclamation - National Bully Prevention Awareness Month (October 2023) Mayor Pro Tem Roque presented the proclamation to Gaby Fernandez, Stanislaus County Serving Seniors Program Director.

4.2. Proclamation - Code Enforcement Officer Appreciation Week (2nd Week of October)
Mayor Pro Tem Roque presented the proclamation to Senior Code Enforcement Officer Gomez and Code Enforcement Officer I Cantu.

4.3. Proclamation - National Hispanic Heritage Month (September 15, 2023 through October 15, 2023)
Mayor Pro Tem Roque presented the proclamation to Albertina Reynoso and the Patterson Promotoras.

4.4. Proclamation - Fire Chief Gregory - (Mayor Clauzel) Mayor Pro Tem Roque presented the proclamation to Fire Chief Gregory.

5. Items from the Public
Yvonne Reynolds, Patterson Resident - addressed City Council in appreciation for taking care of the weeds on Sperry Avenue. Ms. Reynolds also inquired about the plan for the easement and addressed the lack of play equipment at Sunflower Park.

Kandace Weyhrauch, Patterson Resident - addressed City Council to clarify that cannabis dispensary, Nucleus Homeopathic, Inc. is not a member of the Chamber of Commerce. Ms. Weyhrauch also addressed Public Safety Committee meetings, would like to see meetings being held for that commission.

Tim Benefield, Patterson Resident - addressed City Council to congratulate Fire Chief Gregory on his retirement and also expressed his religious beliefs.

Justin Farkas, Field Representative for the Office of Assemblymember Alanis - addressed City Council to provide a legislative update.

Adolfo Virgen, Parks, Recreation & Beautification Commission Member - addressed City Council to provide a reminder for upcoming Parks, Recreation & Beautification Commission meetings. Mr. Virgen also addressed council in appreciation for all the proclamations that are being presented at council meetings.

Gaby Fernandez, Patterson Resident - addressed City Council and provided a speech regarding the anti-bullying proclamation.

6. Consent Calendar
Item 6.4 was pulled by City Attorney Goldstein for consideration and to be brought back to a future agenda.

6.3 Packet Pg. 11
Minutes Acceptance: Minutes of Oct 3, 2023 7:00 PM (Consent Calendar) City of Patterson Page 3 Updated 10/25/2023 11:35 AM
Councilmember Farinha motioned to approve Consent Calendar Items 6.1 through 6.10, excluding 6.4. The motion was seconded by Councilmember Alves and unanimously approved by a 4-0 roll call vote.

RESULT: ADOPTED
MOVER: Farinha
SECONDER: Alves
AYES: Clauzel, Alves, Farinha, Roque
EXCUSED: Romero

6.1. Motion to Waive Readings - All Readings of Ordinances and Resolutions, Except by Title are hereby waived.

6.2. Approve Minutes of Special Meeting/Closed Session - September 19, 2023 (6:00 PM)

6.3. Approve Minutes of Regular Meeting - September 19, 2023 (7:00 PM)

6.4. Approve Second Reading and Adoption of Ordinance No. 870, Reading by Title Only, Waiving Further Reading, an Ordinance of the City Council of the City of Patterson, Confirming the Termination of the Development Agreement By and Between the City of Patterson and Central Valley-Sierra Associates and Authorizing the Recording of a Notice of Termination.

6.5. Approve street closure for Patterson Christmas Festival Events on Saturday, December 2, 2023 and request for City funding.

6.6. Approve Resolution No. 2023-45 Adopting updated Sewer System Management Plan (SSMP) 2023 and Spill Emergency Response Plan (ERP) 2023.

6.7. Approve Resolution No. 2023-46 Accepting the Dutch Bros Project as Complete; Authorizing the City Clerk to File the Notice of Completion.

6.8. Approve Resolution No. 2023-47 Accepting the Grocery Outlet Project as Complete; Authorizing the City Clerk to File the Notice of Completion.

6.9. Approve of Surplus City Vehicle FY 2023/2024.

6.10. Approve Resolution No. 2023-48 Approving the Lease Agreement with PNC Bank for the Purchase of Fire Trucks.

7. Presentation

7.1. Public Works Department - Solid Waste Program Presentation Public Works Director Willett, Public Works Management Analyst Renfrow and Environmental Compliance Specialist Laurel reviewed their presentation.

City Council addressed the following:
- recycling dates and where to find that information
- process for educating the public regarding what goes into each bin - is compost available for city residents?

6.3 Packet Pg. 12
Minutes Acceptance: Minutes of Oct 3, 2023 7:00 PM (Consent Calendar) City of Patterson Page 4 Updated 10/25/2023 11:35 AM
- in the future having a Public Works Day to learn about public works and what the department does
- events for recycling
At 8:10 p.m. Mayor Clauzel opened the item to public comments.

Yolada Magana, Patterson Resident - addressed City Council regarding having a citywide Public Works community day and handing out food waste bins for the community.

Kandace Weyhrauch, Patterson Resident - addressed City Council regarding compost and the Public Works community day event.

At 8:16 p.m. there being no further comments, Mayor Clauzel closed the item to public comments.

8. City Council Reports
A. Councilmember Alves
Nothing to report.
. Stanislaus Homeless Alliance (Councilmember Roque alternate) . Stanislaus County Hazardous Waste Advisory Committee (Councilmember Farinha alternate)
B. Councilmember Romero
. Westside Health Care Task Force (Councilmember Alves alternate) C. Councilmember Farinha
Nothing to report.
. San Joaquin Valley Air Pollution Control District (Councilmember Romero alternate)
D. Mayor Pro Tem Roque
Nothing to report. Next EDAC (Stanislaus County Economic Development Action Committee) meeting will be held tomorrow, October 4, 2023 at 3:00 p.m.
. (EDAC) Stanislaus County Economic Development Action Committee (Mayor Clauzel alternate)
. Workforce Development Board (Mayor Clauzel alternate) E. Mayor Clauzel
Nothing to report.

6.3 Packet Pg. 13
Minutes Acceptance: Minutes of Oct 3, 2023 7:00 PM (Consent Calendar) City of Patterson Page 5 Updated 10/25/2023 11:35 AM
. Stanislaus County Mayor's Meeting
. StanCOG (Mayor Pro Tem Roque alternate)
. League of California Cities (Councilmember Farinha 1st alternate, Councilmember Alves 2nd alternate)

9. Other Matters
Mayor Pro Tem Roque expressed his thanks to the Patterson-Westley Chamber of Commerce.

Mayor Clauzel provided a reminder that it is Domestic Violence and Breasts Cancer Awareness month.

10. Adjournment
There being no further business, the regular meeting of the City Council of the City of Patterson of October 3, 2023 was adjourned at 8:19 p.m.

Approved by the Patterson City Council on November 7, 2023.

6.3 Packet Pg. 14
Minutes Acceptance: Minutes of Oct 3, 2023 7:00 PM (Consent Calendar) City of Patterson Page 1 Updated 10/26/2023 2:51 PM
City Of Patterson
Regular Meeting Minutes
October 17, 2023
City Manager
Ken Irwin
City Attorney
Nubia Goldstein
Deputy City Attorney
Douglas White www.ci.patterson.ca.us
Mayor
Michael Clauzel
City Council
Shivaugn Alves, District A
Jessica Romero, District B
Dominic Farinha, District C
Carlos Roque, District D
City Clerk
Aracely Alegre

1. Call to Order
Attendee Name Title Status Arrived
Michael Clauzel Mayor Present
Shivaugn Alves District A Excused
Jessica Romero District B Present
Dominic Farinha District C Present
Carlos Roque District D Present
City Staff Present:

1. City Manager Irwin

2. City Attorney Goldstein

3. IT Manager Ford

4. Director of Human Resources Guillory-Jones (remote)

5. Director of Engineering and Capital Projects Ulloa

6. Public Works Director Willett (remote)

7. Sheriff Officer Barringer

8. Finance Director Riedeman

9. Police Chief Clayton

10. City Planner Andrews

11. Community Development Director Stice

12. Division Fire Chief Schali

13. Recreation & Community Services Director Weaver

14. Programs Manager Ferriera

15. Deputy City Clerk Mandujano

16. City Clerk Alegre (remote)

2. Pledge of Allegiance

3. Statements of Conflict

6.4 Packet Pg. 15
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City of Patterson Page 2 Updated 10/26/2023 2:51 PM
None.

4. Items from the Public
Kandace Weyhrauch, Chamber of Commerce - addressed City Council to provide an update on upcoming events.

5. Consent Calendar
Councilmember Farinha motioned to approve Consent Calendar Items 5.1 through 5.3. The motion was seconded by Mayor Pro Tem Roque and unanimously approved by a 4-0 roll call vote.

RESULT: ADOPTED
MOVER: Farinha
SECONDER: Roque
AYES: Clauzel, Romero, Farinha, Roque
EXCUSED: Alves

5.1. Motion to Waive Readings - All Readings of Ordinances and Resolutions, Except by Title are hereby waived.

5.2. Approve Resolution No. 2023-49, Authorizing Submittal of Individual Grant Applications for all Grant Programs for which the City of Patterson is Eligible and Authorizing the Required Budget Adjustment by the Finance Department in Fund 600 for FY 23/24 if awarded.

5.3. Accept all bids for the Salado Creek Trail Phase I Project, award construction to Sinclair General Engineering Construction, Inc., authorize staff to execute the contract, and Authorize the Finance Department to make the necessary budget adjustments for Fiscal Years 2023-24.

6. Presentation

6.1. City Manager - Strategic Plan Update City Council Work Session City Manager Irwin and Consultant Annie Rose with Moss Adams reviewed their presentation.

Council Provided Feedback on the Following:
- Future focus and accountability are good to include
- Unsure of connectivity being part of the new proposed vision - Start with safety first, small-town spirit and finish with sustainable growth. - Mayor Pro Tem Roque in favor of Mission Statement Option B - Councilmember Romero in favor of Mission Statement Option A - Councilmember Farinha in favor of Mission Statement Option A - Mayor Clauzel in favor of combining both and changing the word "provide" from Option A to "deliver"
Top 5 City Priorities for City Council:
- Mayor Clauzel - Amenities, Public Safety, Infrastructure, Downtown Revitalization and Economy

6.4 Packet Pg. 16
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City of Patterson Page 3 Updated 10/26/2023 2:51 PM
- Councilmember Romero - Would like to see Downtown Revitalization and Amenities combined. Infrastructure, Public Safety, Economy, Amenities tying it in with Downtown Revitalization and Financial Stability - Councilmember Farinha - Public Safety, Economy, Downtown Revitalization, Infrastructure and Community Growth can be combined, Financial Stability, Amenities
- Mayor Pro Tem Roque - Infrastructure and Community Growth, Public Safety and Emergency Preparedness, Amenities, Financial Stability and Economy.

City Council addressed the following:
- Concerned with limiting the number of priorities
At 7:49 p.m. Mayor Clauzel opened the item to public comments.

Tim Benefield, Patterson Resident - addressed City Council regarding the family component being very important to the City of Patterson and would like to see it included in the Mission Statement.

Yolanda Magana, Patterson Resident - addressed City Council and would like to see a list of priorities gathered from citizens.

Kandace Weyhrauch, Patterson Resident - addressed City Council regarding the need to make technology and recreation more of a priority.

At 7:51 p.m. there being no further comments, Mayor Clauzel closed the item to public comments.

7. Public Hearing

7.1. Planning Department - (Public Hearing continued from October 17, 2023 Regular Council Meeting) Approve Resolution No. 2023-50, approving the Regional Transportation Impact Fee Report and adopting updated development impact fees related to transportation, effective October 17, 2023. Per Ordinance No. 608 (M.C. Section 3.64) related to the approval of transportation development impact fees, motion to approve Resolution No. 2023-50 approving the Regional Transportation Impact Fee Report and adopting updated development impact fees related to transportation, effective October 17, 2023.

City Manager Irwin explained the need to revisit the information on the report as new information has been shared by the stakeholders, leading to the request for moving the item to the November 7th Regular City Council Meeting.

At 7:53 p.m. Mayor Clauzel opened the Public Hearing. There were no comments.

Councilmember Romero motioned to move the item to the Tuesday, November 7, 2023 Regular City Council meeting. The motion was seconded by Mayor Pro Tem Roque and unanimously approved by a 4-0 roll call vote.

6.4 Packet Pg. 17
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City of Patterson Page 4 Updated 10/26/2023 2:51 PM
RESULT: TABLED
MOVER: Romero
SECONDER: Roque
AYES: Clauzel, Romero, Farinha, Roque
EXCUSED: Alves

7.2. Planning Department - Approve the Initial Study / EIR Addendum to the 2010 General Plan EIR for the Transportation Infrastructure Master Plan (TIMP) and adopt the Transportation Infrastructure Master Plan.

Community Development Director Stice and City Planner Andrews reviewed their report.

Consultant Christopher Thnay with Advanced Mobility Group reviewed his presentation.

Council addressed the following:
- Concerns with the stress points, how will they be mitigated? - Concentration into improving the more downtown/historic roads such as M Street, J and L
- Consideration of traffic back-up on I-5
- Alternative plan for the Zacharias area
- Asked for an I-5 corridor design update
- Level of service
Mr. Thnay addressed Council's concerns.

Director of Engineering and Capital Projects Ulloa provided an I-5 corridor design update.

At 8:28 p.m. Mayor Clauzel opened the item to public comment.

Kandace Weyhrauch, Patterson Resident - addressed City Council to request clarification regarding the cost estimate, does it include the Adaptive Signals? Mr. Thnay addressed Ms. Weyhrauch's question.

At 8:30 p.m. there being no further comments, Mayor Clauzel closed the item to public comments.

Mayor Pro Tem Roque moved to approve Item 7.1. The motion was seconded by Councilmember Romero and approved by a 3-0 roll call vote.

6.4 Packet Pg. 18
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City of Patterson Page 5 Updated 10/26/2023 2:51 PM
RESULT: APPROVED
MOVER: Roque
SECONDER: Romero
AYES: Clauzel, Romero, Roque
ABSENT: Farinha
EXCUSED: Alves

8. City Staff Reports

8.1. City Attorney - Adopt Resolution No. 2023-51 providing direction to staff regarding the use of Zoom during City Council meetings, limiting Zoom participation to City of Patterson staff and consultants attending a City Council meeting remotely, but prohibiting public comment via Zoom unless a City Council member is participating in the meeting via Zoom.

City Attorney Goldstein reviewed her report.

At 8:39 p.m. Mayor Clauzel opened the item to public comments.

Kandace Weyhrauch, Patterson Resident - addressed City Council in opposition of the item. Ms. Weyhrauch is concerned that the commuter population in town that are not able to attend in person may want to provide public comment using zoom. Ms. Weyhrauch stated that it would alienate some members of the community.

At 8:42 p.m. there being no further comments, Mayor Clauzel closed the item to public comments.

Action: Moved/Seconded: Councilmember Farinha/Mayor Pro Tem Roque Yes: Councilmember Farinha, Mayor Pro Tem Roque
Noes: Councilmember Romero, Mayor Clauzel
Motion failed with a 2-2 roll call vote.

Council discussed the following:
- Concerns with preventing the community from participating. - Would like for the resolution to be temporary or for the public to submit written comments.
- Would like to know what the options are to shut someone down if there are those types of comments?
- Can all comments be stopped once a negative comment is made? City Attorney Goldstein addressed council's concerns.

Alternative Motion: Adopt Resolution 2023-51 limiting Zoom participation to City of Patterson staff and consultants attending a City Council meeting remotely, but prohibiting public comment via Zoom unless a City Council member is participating in the meeting via Zoom, with an amendment that it will be a

6.4 Packet Pg. 19
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City of Patterson Page 6 Updated 10/26/2023 2:51 PM
temporary resolution, bringing it back to discuss at the December 5, 2023 Regular City Council meeting.

Action:

Yes:

Noes:

Moved/Seconded: Mayor Clauzel/ Councilmember Farinha
Councilmembers Romero, Farinha, Mayor Pro Tem Roque
and Mayor Clauzel
None
Motion passes with a 4-0 roll call vote.

9. City Council Reports
A. Councilmember Alves
. Stanislaus Homeless Alliance (Councilmember Roque alternate) . Stanislaus County Hazardous Waste Advisory Committee (Councilmember Farinha alternate)
B. Councilmember Romero
Nothing to report.
. Westside Health Care Task Force (Councilmember Alves alternate) C. Councilmember Farinha
Nothing to report.
. San Joaquin Valley Air Pollution Control District (Councilmember Romero alternate)
D. Mayor Pro Tem Roque
. (EDAC) Stanislaus County Economic Development Action Committee (Mayor Clauzel alternate)
Mayor Pro Tem Roque provided an update on ongoing projects. . Workforce Development Board (Mayor Clauzel alternate) E. Mayor Clauzel
Nothing to report.
. Stanislaus County Mayor's Meeting
. StanCOG (Mayor Pro Tem Roque alternate)
. League of California Cities (Councilmember Farinha 1st alternate, Councilmember Alves 2nd alternate)

6.4 Packet Pg. 20
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City of Patterson Page 7 Updated 10/26/2023 2:51 PM

10. Other Matters
City Manager Irwin introduced new Recreation & Community Services Department Director Weaver.

Councilmember Farinha addressed traffic congestion concerns with the new Performance Center building along Ward Avenue.

Mayor Clauzel and Mayor Pro Tem Roque addressed the zoom bombings item on the agenda.

11. Adjournment
There being no further business, the regular meeting of the City Council of the City of Patterson of October 17, 2023 was adjourned at 9:10 p.m.

Approved by the Patterson City Council on November 7, 2023.

6.4 Packet Pg. 21
Minutes Acceptance: Minutes of Oct 17, 2023 7:00 PM (Consent Calendar) City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Fernando Ulloa, City Engineer
MEETING DATE: November 7, 2023
ITEM NO: 6.5
SUBJECT: Approve Resolution No. 2023-52 Accepting the Public Improvements for Villages of Patterson, Cromwell Shire Unit 2 onsite as Complete; Authorizing the City Clerk to File the Notice of Completion; and Begin the One-Year Warranty.

RECOMMENDATION
Motion to Approve Resolution No. 2023-52 Accepting the Public Improvements for Villages of Patterson, Cromwell Shire Unit 2 onsite Improvements as Complete; Authorizing the City Clerk to File the Notice of Completion; and Begin the One-Year Warranty

BACKGROUND
On December 12, 2006 City Council of the City of Patterson adopted a resolution 2006-122 conditionally improving the tentative map for Villages of Patterson subdivision. On April 6, 2021 the City Council approved resolution 2021-20 and authorized City Manager to enter into a Subdivision Improvement Agreement and to receive a Final Map of Cromwell Shire 1 & 2 Development located in VOP Master Development Area.

The developer, KB Homes North Bay LLC, hired Teichert Construction Inc. and their subcontractors to construct the project. Villages of Patterson, Cromwell Shire Unit 2 Onsite improvements has been completed and the developer has complied with all Conditions of Approval and is requesting to be placed on the City Council agenda for acceptance of all Public Improvements.

ANALYSIS

6.5 Packet Pg. 22
The City’s Engineer(s) and Public Works staff have performed the necessary inspections on all the onsite public improvements and certify that the developer has met all requirements for the general improvements and onsite operations. A notice of completion and a resolution are attached for Council’s approval.

The onsite improvements constructed were Cheshire Drive, Stawell Drive, Mansfield Drive, Cumbria Lane and south side of Somerset Way. The developer has also installed, as part of the new streets mentioned, the sidewalks, curb & gutter, streetlights, corner monument, asphalt pavement, water, sewer, storm drain system utilities and offsite landscaping & irrigation system.

A resolution has been prepared and attached to accept the onsite public improvements and to begin the one-year warranty period. The Notice of Completion and the Agreement will need to be recorded by the City Clerk.

The City has collected the Warranty Bond/Payment for the Public Improvements.

FISCAL IMPACT
There is no budget impact associated with this item. The developer has paid all costs associated with these items and posted the required warranty bonds/check with the City Clerk. A Community Facilities District (CFD) has been created for this subdivision for maintenance of these improvements.

Attachments: Resolution No. 2023-52

Notice of Completion
Exhibit A (map)

6.5 Packet Pg. 23
1 1
2 RESOLUTION NO. 2023-52
3 4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PATTERSON, 5 ACCEPTING THE ON-SITE WORK AS COMPLETE, AUTHORIZING STAFF TO FILE 6 THE NOTICE OF COMPLETION FOR THE PUBLIC IMPROVEMENTS FOR 7 VILLAGES OF PATTERSON CROMWELL SHIRE UNIT 2 ONSITE
8 WHEREAS, the Developer/Owner, “KB Homes North Bay LLC”, and the 9 Contractor, “Teichert Construction Inc.” have completed all the public improvements for 10 the Villages of Patterson Cromwell Shire Unit 2 Onsite in accordance to the contract 11 requirements and plans and specifications; and
12 WHEREAS, the Engineering and Public Works Department have inspected the 13 work and recommended that the project be accepted as complete. 14 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of 15 Patterson that it hereby accepts the project as complete, directs the City Clerk of the City 16 of Patterson to file the Notice of Completion and commence the Warranty Period for the 17 Villages of Patterson Cromwell Shire Unit 2 Onsite.
18 The foregoing resolution was passed by the City Council at a regular meeting held on the 7
th 19 day of November 2023 by _______________, who moved its adoption, which 20 motion was duly seconded by _________________, and the resolution adopted by the 21 following roll call vote:
22 AYES:
23 NOES:
24 EXCUSED:
25 26 APPROVED:
27 28
29 _________________________
30 31 Michael Clauzel
32 Mayor of the City of Patterson

6.5.a
Packet Pg. 24
Attachment: Resolution No. 2023-52_NOC_-_Cromwell_Shire_-_2 (Approve Resolution No. 2023-52 Accepting the Public Improvements for 2 1
2 ATTEST:
3 4
5 6 __________________________________________
7 Aracely Alegre
8 City Clerk of the City of Patterson
9 10
11 12
13 14
15 16
17 I hereby certify that the foregoing is a full, correct and true copy of a resolution 18 passed by the City Council of the City of Patterson, a Municipal Corporation of the County of Stanislaus, State of California, at a regular meeting held on the 7 th 19 day of November
20 2023, and I further certify that said resolution is in full force and effect and has never been 21 rescinded or modified.
22 DATED:
23 24 ____________________________
25 City Clerk of the City of Patterson
26 27
28 6.5.a
Packet Pg. 25
Attachment: Resolution No. 2023-52_NOC_-_Cromwell_Shire_-_2 (Approve Resolution No. 2023-52 Accepting the Public Improvements for Recording Requested By:

CITY OF PATTERSON
When Recorded Mail To:

City Clerk’s Office
City of Patterson
P.O. Box 667
Patterson, CA 95363
SPACE ABOVE THIS LINE FOR RECORDER’S USE

CITY OF PATTERSON

NOTICE OF COMPLETION
(Resolution Attached)
Notice is hereby given that:

1. The undersigned is a representative of the owner of the interest or estate stated below in the property hereinafter described.

2. The full name of the owner is the City of Patterson.

3. The full address of the owner is 1 Plaza, Patterson, CA 95363.

4. The nature of the title of the owner is In Fee.

5. A work of improvement on the property hereinafter described was completed on November 07, 2023

6. The name of the contractor, for such work of improvement was Teichert Construction Inc.

7. The nature of the work of improvement was Onsite Infrastructure Improvements Cromwell Shire Unit 2

8. The property on which said work of improvement was completed is in the city of Patterson, County of Stanislaus, State of California, and is described as follows: New streets Cheshire drive, Stawell drive, Mansfield drive, Cumbria lane, and part of the Sommerset way, sidewalks, landscaping, curb & gutter, streetlights, water system, sewer system, storm system utilities, corner monument and offsite landscaping.

9. The street address of said property is on Sycamore Ave & Summerset Lane I, Fernando Ulloa, declare under penalty of perjury, under the laws of the State of California that the foregoing is true and correct.

Signing on behalf of City of Patterson
Dated: ____________ By
Fernando Ulloa, City Engineer
VERIFICATION:

I, _______________________________________, the undersigned, declare under penalty, under the laws of the State of California that I am the owner, or agent to the owner, of the interest or estate in the property described in the above notice; that I have read the notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct.

Executed on ________________________, at Patterson, California. (date)
Signing on behalf of City of Patterson
Fernando Ulloa, City Engineer, City of Patterson

6.5.b
Packet Pg. 26
Attachment: NOC_-_Cromwell_Shire_-_2 (1) (Approve Resolution No. 2023-52 Accepting the Public Improvements for Villages of Patterson)

EXHIBIT
-A

6.5.c
Packet Pg. 27
Attachment: EXHIBIT_A (Approve Resolution No. 2023-52 Accepting the Public Improvements for Villages of Patterson) City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Fernando Ulloa, City Engineer
MEETING DATE: November 7, 2023
ITEM NO: 6.6
SUBJECT: Approve the proposal from Melton Design Group, Inc. for the Centennial Park Conceptual Design, Final Design, and Community Center Preliminary Design, authorize staff to enter into a negotiated Consultant Agreement with a not to exceed cost of $535,172.00 and authorize the Finance Department to make the necessary budget adjustments for Fiscal Years 2023-24.

RECOMMENDATION
Motion to Approve the proposal from Melton Design Group, Inc. for the Centennial Park Conceptual Design, Final Design, and Community Center Preliminary Design, authorize staff to enter into a negotiated Consultant Agreement with a not to exceed cost of $535,172.00 and authorize the Finance Department to make the necessary budget adjustments for Fiscal Years 2023-24.

BACKGROUND
The City of Patterson contracted a scope of work with RHAA Landscape Architecture & Planning to provide a rendering of the site plan for the proposed Centennial Park, which included the PJUSD Theater building. During the completion of the final park master plan design, PJUSD began the architectural design work for the PJUSD Theater. Upon completion of the theater design, it was realized that the site plan designed for the theater was larger and in a different location than designated in the master plan. Therefore, due to the adjustment in the design size and location of the district’s theater, features designed within the Centennial Park Master Plan must be reallocated as well as adjustments made to landscaping, sidewalks, and playgrounds. In lieu of issuing a scope of work to update the Master Plan to RHAA, during the City Council meeting February 7, 2023, council requested this item be returned at a later date for further discussion.

6.6 Packet Pg. 28
At the March 21, 2023 City Council meeting, City Staff was directed to issue a request for proposals for the Centennial Park Conceptual Design, Final Design, and Community Center Preliminary Design.

ANALYSIS
A Request For Proposals (RFP) was prepared and advertised in the Patterson Irrigator, listed on our City website and was distributed through our online posting site CIPList.com. 43 engineering firms received/downloaded the RFP and supporting documentation. 30 exchanges, plan-wells, associations, or other firms received/downloaded the RFP and supporting documentation.

The City received four proposals from the following firms:
· Melton Design Group, Inc.
· Mid Valley Engineering
· O’Dell Engineering
· RHAA
Proposals were screened by a selection committee and rated on:
· Understanding of the Project (35%, scored on a 1-10 scale) · Responsiveness to the RFP (35%, scored on a 1-10 scale) · Rates relative to services provided (30%, scored on a 1-10 scale) The proposals were reviewed by City staff and was determined to conducted interviews with the top three ranked firms.

While all consultants interviewed exhibited good comprehension of the project, Melton Design Group, Inc. was the top ranked consultant. Therefore, staff recommends Melton Design Group, Inc. for the design of this project based on the evaluation of their qualifications and experience.

FISCAL IMPACT
Staff negotiated with Melton Design Group, Inc. to an agreeable scope and fee of $486,520.00.

The total cost for the contract includes all tasks 1-8 as listed in the RFP. Staff recommends awarding the design to Melton Design Group, Inc. for this amount and authorizing the budget with our standard 10% contingency.
$486,520.00 Melton Design Group, Inc.
$48,652.00 10% Contingency
$535,172.00 Total Phase Project Cost
Contingency will only be utilized if needed.

6.6 Packet Pg. 29
Current funding for this project is as follows:
$250,000 Centennial Park (Account# 100-250-7565)
$285,172 (Account# 103-000-7576)

$535,172.00 Total Funds Available

6.6 Packet Pg. 30
City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Fernando Ulloa, City Engineer
MEETING DATE: November 7, 2023
ITEM NO: 6.7
SUBJECT: Accept all bids for the South Park Improvements, and award construction to Sinclair General Engineering Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to make the necessary budget adjustments for Fiscal Year 2023-24.

RECOMMENDATION
Motion to Accept all bids for the South Park Improvements, and award construction to Sinclair General Engineering Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to make the necessary budget adjustments for Fiscal Year 2023-24.

BACKGROUND
Under Prop 68, funds are available for local park rehabilitation, creation and improvement grants to local governments on a per capita basis. Grant recipients were encouraged to utilize awards to rehabilitate existing infrastructure and to address deficiencies in neighborhoods lacking access to the outdoors. A scope of work was developed and the city was awarded $191,474.

ANALYSIS
The city reviewed the draft Parks and Recreation Master Plan to identify areas where recreational deficiencies exist. It was determined Veteran’s Memorial Park (South Park) can benefit from this grant where 100 percent of the funds can be utilized. South Park currently has horseshoe pits that are underutilized and in poor condition. It is the city’s intent to remove these facilities and replace them with new hardscape, BBQ pits and picnic tables for public use.

The South Park Improvements Project design was completed in February 2023. The Project was subsequently advertised in August 2023 on CIP List, the City’s website, and the Patterson

6.7 Packet Pg. 31
Irrigator Newspaper. Bids were scheduled and opened at 2 pm on August 31, 2023. The City received a total of two (2) bids for this project. The two bids received are listed below from lowest to highest.

Sinclair General Engineering Construction, Inc. $431,032.39 M.H.K Construction, Inc. $441,544.13
After reviewing the bid documents, Sinclair General Engineering Construction, Inc., was deemed the lowest responsible bidder.

FISCAL IMPACT
This project was budgeted at $169,902.18 from the per Capita Grant of Prop 68, but the apparent low bid was $431,032.39. Staff is requesting a budget adjustment of $304,233.45. This amount will cover the deficit plus a 10 percent contingency. See below for proposed (project) budget:
$ 431,032.39 Base Bid
$ 43,103.24 10% Contingency
$ 474,135.63 Total
Proposed funding sources:
$169,902.18 South Park Imp
$304,233.45 ARPA Fund
(Acct#100-710-7552
(Acct#103-000-7565)

6.7 Packet Pg. 32
City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Fernando Ulloa, City Engineer
MEETING DATE: November 7, 2023
ITEM NO: 6.8
SUBJECT: Approve the proposal from Provost & Pritchard Consulting Group for the Ward Avenue Overlay Phase II Project and section of Non-Potable Water Main, authorize staff to enter into a negotiated Consultant Agreement with a not to exceed cost of $94,066.00.

RECOMMENDATION
Motion to Approve the proposal from Provost & Pritchard Consulting Group for the Ward Avenue Overlay Phase II Project and section of Non-Potable Water Main, authorize staff to enter into a negotiated Consultant Agreement with a not to exceed cost of $94,066.00.

BACKGROUND
Ward Avenue is a north and south bound two-lane collector roadway. It serves the surrounding residential neighborhoods as a main roadway to their destinations and it's one of the City's busiest streets. There are several schools located in the vicinity causing heavier traffic volumes in the mornings and afternoons hours. There are residential homes that back up to this portion of Ward Avenue with downtown being just east of the project area.

This project consists of providing a design set of plans and specifications for a 2-inch Hot Mix Asphalt (HMA) overlay on Ward Avenue from west Las Palmas Ave to North 9th Street.

Design plans will include any severe damaged pavement areas to be excavated and reconstructed with the appropriate structural section thickness as well as requiring the existing road to be cold planed where tying into the existing road sections and along existing gutter sections prior to the overlay. All existing utility manholes and valve covers to be raised to new pavement grade and thermoplastic striping and pavement markings to be applied.

Staff has included the design of a portion of the non-potable water main to be installed as part of

6.8 Packet Pg. 33
this project. This portion of project will install approximately 300 linear feet of 6” non-potable water line to connect the landscaping of the Hammon Senior Center. In recent years, the City of Patterson has been expanding its non-potable water system to utilize lower quality water that does not meet state and federal requirements for drinking and direct it for landscape uses. This portion of the non-potable water main will be moving forward at this time to coordinate the placement of the pipe with the new pavement design. This is an effort to comply with the City Street moratorium guidelines as detailed in City Ordinance No. 840.

ANALYSIS
A Request For Proposals (RFP) for Engineering and Design Services was prepared and sent to the engineering firms on the on-call list. 3 proposals and estimated fees (based on hourly rates) were submitted by the following firms:

Provost & Pritchard Consulting Group
GDR Engineering, Inc.

O’Dell Engineering
The proposals were screened by a selection committee and rated on:
· Understanding of the Project (40%, scored on a 1-10 scale) · Costs for services provided (60%, scored on a 1-15 scale) The proposals were very clear and concise and showed good understanding of the project, while also meeting the requirements set forth in the RFP.

Staff recommends Provost & Pritchard Consulting Group for the design of this project based on the evaluation of their qualifications and experience.

FISCAL IMPACT
Staff negotiated with Provost & Pritchard Consulting Group for a final and agreeable scope of work and fee of $94,066.00. Staff recommends awarding the design to Provost & Pritchard Consulting Group and authorizing the budget with our standard 10% contingency. $84,646.00 Provost & Pritchard Consulting Group - Ward Avenue Overlay Phase II Project $8,464.60 10% Contingency
$93,110.60 Subtotal Ward Avenue Overlay Phase II Project $9,420.00 Provost & Pritchard Consulting Group - Non-Potable Water Main $942.00 10% Contingency
$10,362.00 Subtotal Project Cost Non-Potable Phase 1 Project $103,472.60 Total Project Cost

6.8 Packet Pg. 34
Contingency will only be utilized if needed.

Current funding for this project is as follows:
$93,110.60 Ward Avenue Overlay Phase II Project
(ACCT# 327-000-7631)
$10,362.00 Non-Potable Phase 1 Project
(ACCT# 611-790-7639)
$ 103,472.00 Total Project Budget

6.8 Packet Pg. 35
City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Mike Willett, Public Works Director
MEETING DATE: November 7, 2023
ITEM NO: 7.1
SUBJECT: Presentation to Honor Patterson’s Hometown Heroes for Year 2022-2023

RECOMMENDATION
Receive presentation and Honor Patterson’s Hometown Heroes for Year 2022-2023.

BACKGROUND
The City of Patterson Hometown Hero program was implemented in November 2021. The program like many other programs statewide, provides the opportunity for their community to recognize and honor their residents and their immediate family members who have either served or are currently serving in the United States Armed Forces, are First Responders, or Frontline Workers. The City has an online application process and an established eligibility criteria for this program. The cost is $200 per year.

Hometown Hero banners are displayed on city-owned streetlight poles on Sperry Avenue (from Las Palmas Avenue to Baldwin Avenue) promote civic pride within the community. The program has had good participation during its first year, and the city would like to continue the program.

ANALYSIS
The city has designated 21 streetlight locations. During the first year 18 banners were displayed and in 2022-23 a total of 19 banners were displayed. Applications are received all year and banners are displayed from November – November. The banners are also displayed on the City’s Hometown Hero webpage https://www.ci.patterson.ca.us/880/Hometown-Heroes

7.1 Packet Pg. 36
At the end of the display period, banners are returned back to the family and/or applicant who purchased the banner at a public meeting to honor those who were displayed through this program. All participants have been invited to attend this meeting to receive their banners in honor of their Hometown Hero.

FISCAL IMPACT
There is no fiscal impact associated with this item. All costs are funded by fees established for the program.

7.1 Packet Pg. 37
City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Bryan Stice, Community Development Director
MEETING DATE: November 7, 2023
ITEM NO: 8.1
SUBJECT: Approve Entering into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC and authorize the City Manager or his Designee to execute the agreement.

RECOMMENDATION
Motion to Approve entering into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC and authorize the City Manager or his Designee to execute the agreement.

BACKGROUND
Some time ago, City staff was approached by representatives from New Cingular Wireless PCS, who indicated that they had a gap in wireless coverage in the vicinity of the Aquatic Center and Centennial Park. City property in those areas seemed to be the best location to accommodate such a tower. An application was submitted for a site at Centennial Park, however, the City Council expressed concern that locating the tower as proposed could restrict development of the future Centennial Park and directed staff to work with the applicant on an alternative site. This application represents that new site.

The project is an unmanned wireless facility, consisting of an 84.9’ tall decorative bell tower, an 8’ x 8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project would be located in a vacant 900 square-foot area outside the fence, off of the southwest edge of the Aquatics Center. A minimal access easement would extend from West Las Palmas Avenue to provide all-weather access to the site.

The project site is located on City-owned property that currently includes existing facilities, such as the Aquatics Center, Hammon Senior Center, skate park, and Recreation Department offices.

Tilton Park is located to the west.

8.1 Packet Pg. 38
The Planning Commission reviewed the project at the September 28, 2023 meeting and approved the conditional use permit required for the project.

Because the project would require the lease of City land, a draft agreement has been prepared.

ANALYSIS
The draft lease agreement includes the following key terms:
· The City (Landlord) would provide New Cingular Wireless PCS, LLC (tenant) an option to lease the 900 square feet associated with the project for necessary studies and tests in exchange for $500.
· The initial term of the lease would be a five-year period, which automatically renew for four additional five-year terms unless the Tenant informs the Landlord of the intention not to renew within 60 days of the term expiration.
· The tenant would pay the Landlord $1500 per month. Each year, the monthly rent would increase by two percent.
· If either party is in default of the agreement, the agreement may be terminated by the other party with 30 days written notice.
· The tenant shall maintain two million dollars of commercial general liability insurance for bodily injury, personal injury, and property damage.

FISCAL IMPACT
Monthly payment of rent to the City in the amount of $1,500 per month with annual increases

8.1 Packet Pg. 39
AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL Market: Northern California
Cell Site Number: CVL01687
Search Ring Name: Patterson 2
Cell Site Name: Patterson 2 (CA)
Fixed Asset Number: 14758136

OPTION AND LAND LEASE AGREEMENT
THIS OPTION AND LAND LEASE AGREEMENT (“Agreement”), dated as of the latter of the signature dates below (the “Effective Date”), is entered into by the City of Patterson, a California municipal corporation, having a mailing address of c/o City Hall, Attn: City Manager, P.O. Box 667, Patterson, CA (“Landlord”), and New Cingular Wireless PCS, LLC, a Delaware limited liability company, having a mailing address of 1025 Lenox Park Blvd. NE, 3
rd Floor, Atlanta, GA 30319 (“Tenant”).

BACKGROUND
Landlord owns that certain plot, parcel or tract of land, as described on Exhibit 1, together with all rights and privileges arising in connection therewith, having a common street address of 1025 W Las Palmas, located in the City of Patterson, County of Stanislaus, State of California, 95363 [APN: 021-070-002].

Landlord desires to grant to Tenant the right to use a portion of the Property in accordance with this Agreement.

The parties agree as follows:

1. OPTION TO LEASE.
(a) Landlord grants to Tenant an exclusive option (the “Option”) to lease (i) a certain portion of the Property containing approximately nine hundred (900) square feet including the air space above such ground space, as described on attached Exhibit 1, together with (ii) the areas as described and depicted on attached Exhibit 1 where the swing of those certain access gates may encroach into the Property (collectively, the “Premises”), for the placement of a Communication Facility in accordance with the terms of this Agreement.
(b) During the Option Term, and during the Term, Tenant and its agents, engineers, surveyors and other representatives will have the right to enter upon the Property to inspect, examine, conduct soil borings, drainage testing, material sampling, radio frequency testing and other geological or engineering tests or studies of the Property (collectively, the “Tests”), to apply for and obtain licenses, permits, approvals, or other relief required of or deemed necessary or appropriate at Tenant’s sole discretion for its use of the Premises and include, without limitation, applications for zoning variances, zoning ordinances, amendments, special use permits, and construction permits (collectively, the “Government Approvals”), initiate the ordering and/or scheduling of necessary utilities, and otherwise to do those things on or off the Property that, in the opinion of Tenant, are necessary in Tenant’s sole discretion to determine the physical condition of the Property, the environmental history of the Property, Landlord’s title to the Property and the feasibility or suitability of the Property for Tenant’s Permitted Use, all at Tenant’s expense. Tenant will not be liable to Landlord or any third party on account of any pre-existing defect or condition on or with respect to the Property, whether or not such defect or condition is disclosed by Tenant’s inspection. Tenant will restore the Property to its condition as it existed at the commencement of the Option Term, reasonable wear and tear and loss by casualty or other causes beyond Tenant’s control excepted.

8.1.a
Packet Pg. 40
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 2 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL (c) In consideration of Landlord granting Tenant the Option, Tenant agrees to pay Landlord the sum of Five Hundred and No/100 Dollars ($500.00) within thirty (30) business days after the Effective Date.

The Option may be exercised during an initial term of one (1) year commencing on the Effective Date (the “Initial Option Term”) which term may be renewed by Tenant for an additional one (1) year (the “Renewal Option Term”) upon notification to Landlord and the payment of an additional Five Hundred and No/100 Dollars ($500.00) prior to the expiration date of the Initial Option Term. The Initial Option Term and any Renewal Option Term are collectively referred to as the “Option Term.” (d) The Option may be sold, assigned or transferred (each, a “Transfer”) at any time by Tenant without Landlord’s consent only to an Affiliate (as defined in Section 24(i) below) of Tenant. Tenant may not otherwise Transfer the Option without the prior written consent of Landlord, which shall not be unreasonably withheld. Upon the effective date of a Transfer of the Option by Tenant to an Affiliate of Tenant, or to any other transferee with the written approval from Landlord of such Transfer, and written notification from Tenant to Landlord of any such Transfer, Tenant shall immediately be released from any and all liability under this Agreement, including the payment of any rental or other sums due, without any further action.
(e) During the Option Term, Tenant may exercise the Option by notifying Landlord in writing. If Tenant exercises the Option, then Landlord leases the Premises to Tenant subject to the terms and conditions of this Agreement. If Tenant does not exercise the Option during the Option Term or any extension thereof, then this Agreement will terminate, and the parties will have no further liability to each other. (f) If during the Option Term, or during the Term if the Option is exercised, Landlord decides to subdivide, sell, or change the status of the zoning of the Premises, the Property or any of Landlord’s contiguous, adjoining or surrounding property (the “Surrounding Property”), or in the event of a threatened foreclosure on any of the foregoing, Landlord shall immediately notify Tenant in writing. Landlord agrees that during the Option Term, or during the Term if the Option is exercised, Landlord shall not initiate or consent to any change in the zoning of the Premises, the Property or the Surrounding Property or impose or consent to any other use or restriction that would prevent or limit Tenant from using the Premises for the Permitted Use. Any and all terms and conditions of this Agreement that by their sense and context are intended to be applicable during the Option Term shall be so applicable.

2. PERMITTED USE. Tenant may use the Premises for the transmission and reception of communications signals and the installation, construction, maintenance, operation, repair, replacement and upgrade of communications fixtures and related equipment, cables, accessories and improvements, which may include a suitable support structure (“Structure”), associated antennas, equipment shelters or cabinets and fencing and any other items necessary to the successful and secure use of the Premises (the “Communication Facility”), as well as the right to test, survey and review title on the Property; Tenant further has the right but not the obligation to add, modify and/or replace equipment in order to be in compliance with any current or future federal, state or local mandated application, including, but not limited to, emergency 911 communication services, at no additional cost to Tenant or Landlord (collectively, the “Permitted Use”). Landlord and Tenant agree that any portion of the Communication Facility that may be conceptually described on Exhibit 1 will not be deemed to limit Tenant’s Permitted Use. If Exhibit 1 includes zoning drawings of the initial installation of the Communication Facility, Landlord’s execution of this Agreement will signify Landlord’s approval of Exhibit 1. For a period of ninety (90) days following the start of construction, Landlord grants Tenant, its subtenants, licensees and sublicensees, the right to use such portions of the Surrounding Property as may reasonably be required during construction and installation of the Communication Facility. Tenant has the right to install and operate transmission cables from the equipment shelter or cabinet to the antennas, electric lines from the main feed to the equipment shelter or cabinet and communication lines from the Property’s main entry point to the equipment shelter or cabinet, install a generator and to make other improvements, alterations, upgrades or additions appropriate for Tenant’s Permitted Use, including the right to construct a fence around the Premises or equipment, install warning signs to make individuals aware of risks, install protective barriers, install any other control measures reasonably required by Tenant’s safety procedures or applicable law, and undertake any other appropriate

8.1.a
Packet Pg. 41
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 3 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL means to secure the Premises or equipment at Tenant’s expense, subject to all applicable Laws (as defined in Section 24(d) below) for such installation and operation activity. Tenant has the right to modify, supplement, replace, upgrade, expand the Communication Facility (including, for example, increasing the number of antennas or adding microwave dishes) or relocate the Communication Facility within the Premises at any time during the Term. Tenant will be allowed to make such alterations to the Property in order to ensure that the Communication Facility complies with all applicable federal, state or local laws, rules or regulations. In the event Tenant desires to modify or upgrade the Communication Facility, in a manner that requires an additional portion of the Property (the “Additional Premises”) for such modification or upgrade, Landlord agrees to lease to Tenant the Additional Premises, upon the same terms and conditions set forth herein, except that the Rent shall increase, in conjunction with the lease of the Additional Premises by the amount equivalent to the then-current per square foot rental rate charged by Landlord to Tenant times the square footage of the Additional Premises. Landlord agrees to take such actions and enter into and deliver to Tenant such documents as Tenant reasonably requests in order to effect and memorialize the lease of the Additional Premises to Tenant.

3. TERM.
(a) The initial lease term will be five (5) years (the “Initial Term”), commencing on the effective date of written notification by Tenant to Landlord of Tenant’s exercise of the Option (the “Term Commencement Date”). The Initial Term will terminate on the fifth (5th) anniversary of the Term Commencement Date.
(b) This Agreement will automatically renew for four (4) additional five (5) year term(s) (each additional five (5) year term shall be defined as an “Extension Term”), upon the same terms and conditions set forth herein unless Tenant notifies Landlord in writing of Tenant’s intention not to renew this Agreement at least sixty (60) days prior to the expiration of the Initial Term or the then-existing Extension Term. (c) Unless (i) Landlord or Tenant notifies the other in writing of its intention to terminate this Agreement at least six (6) months prior to the expiration of the final Extension Term, or (ii) the Agreement is terminated as otherwise permitted by this Agreement prior to the end of the final Extension Term, this Agreement shall continue in force upon the same covenants, terms and conditions for a further term of one (1) year, and for annual terms thereafter (“Annual Term”) until terminated by either party hereto by giving to the other party hereto written notice of its intention to so terminate at least four (4) months prior to the end of any such Annual Term. Monthly rent during such Annual Terms shall be equal to the Rent paid for the last month of the final Extension Term. If Tenant remains in possession of the Premises after the termination of this Agreement, then Tenant will be deemed to be occupying the Premises on a month-to-month basis (the “Holdover Term”), subject to the terms and conditions of this Agreement. (d) The Initial Term, any Extension Terms, any Annual Terms and any Holdover Term are collectively referred to as the “Term.”

4. RENT.
(a) Commencing on the first day of the month following the date that Tenant commences construction (the “Rent Commencement Date”), Tenant will pay Landlord on or before the fifth (5th) day of each calendar month in advance, One Thousand Five Hundred and No/100 Dollars ($1,500.00) (the “Rent”), at the address set forth above. In any partial month occurring after the Rent Commencement Date, the Rent will be prorated. The initial Rent payment will be forwarded by Tenant to Landlord within fortyfive (45) days after the Rent Commencement Date. (b) Upon each anniversary of the Rent Commencement Date during the Initial Term and each Extension Term exercised, the monthly Rent will increase by two percent (2%) over the Rent paid during the previous year.

8.1.a
Packet Pg. 42
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 4 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL (c) All charges payable under this Agreement such as utilities and taxes shall be billed by Landlord within one (1) year from the end of the calendar year in which the charges were incurred; any charges beyond such period shall not be billed by Landlord, and shall not be payable by Tenant. The foregoing shall not apply to monthly Rent which is due and payable without a requirement that it be billed by Landlord. The provisions of this subsection shall survive the termination or expiration of this Agreement.

5. APPROVALS.
(a) Landlord agrees that Tenant’s ability to use the Premises is contingent upon the suitability of the Premises and Property for the Permitted Use and Tenant’s ability to obtain and maintain all Government Approvals. Landlord authorizes Tenant to prepare, execute and file all required applications to obtain Government Approvals for the Permitted Use and agrees to reasonably assist Tenant with such applications and with obtaining and maintaining the Government Approvals. (b) Tenant has the right to obtain a title report or commitment for a leasehold title policy from a title insurance company of its choice and to have the Property surveyed by a surveyor of its choice. (c) Tenant may also perform and obtain, at Tenant’s sole cost and expense, soil borings, percolation tests, engineering procedures, environmental investigation or other tests or reports on, over, and under the Property, necessary to determine if Tenant’s use of the Premises will be compatible with Tenant’s engineering specifications, system, design, operations or Government Approvals.

6. TERMINATION. This Agreement may be terminated, without penalty or further liability, as follows:
(a) by either party on thirty (30) days prior written notice, if the other party remains in default under Section 15 of this Agreement after the applicable cure periods; (b) by Tenant upon written notice to Landlord, if Tenant is unable to obtain, or maintain, any required approval(s) or the issuance of a license or permit by any agency, board, court or other governmental authority necessary for the construction or operation of the Communication Facility as now or hereafter intended by Tenant; or if Tenant determines, in its sole discretion that the cost of or delay in obtaining or retaining the same is commercially unreasonable;
(c) by Tenant, upon written notice to Landlord, if Tenant determines, in its sole discretion, due to the title report results or survey results, that the condition of the Premises is unsatisfactory for its intended uses;
(d) by Tenant upon written notice to Landlord for any reason or no reason, at any time prior to commencement of construction by Tenant; or
(e) by Tenant upon sixty (60) days’ prior written notice to Landlord for any reason or no reason, so long as Tenant pays Landlord a termination fee equal to three (3) months’ Rent, at the then-current rate, provided, however, that no such termination fee will be payable on account of the termination of this Agreement by Tenant under any termination provision contained in any other Section of this Agreement, including the following: Section 5 Approvals, Section 6(a) Termination, Section 6(b) Termination, Section 6(c) Termination, Section 6(d) Termination, Section 11(d) Environmental, Section 18 Condemnation or Section 19 Casualty.

7. INSURANCE. During the Option Term and throughout the Term, Tenant shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount of Two Million Dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, contractual liability. The general aggregate limit shall be twice the required occurrence limit. Tenant’s commercial general liability policies shall be primary and shall not seek contribution from the Landlord’s coverage, and be endorsed using Insurance Services Office form CG 20 10 (or equivalent) to provide that Landlord and its officers, officials, employees, and agents shall be additional insureds under such policies as respects this Agreement. Notwithstanding the foregoing, Tenant may, in its sole discretion, self-insure any of the required insurance under the same terms as required by this Agreement.

8.1.a
Packet Pg. 43
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 5 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL

8. INTERFERENCE.
(a) Prior to or concurrent with the execution of this Agreement, Landlord has provided or will provide Tenant with a list of radio frequency user(s) and frequencies used on the Property as of the Effective Date. Tenant warrants that its use of the Premises will not interfere with those existing radio frequency uses on the Property, as long as the existing radio frequency user(s) operate and continue to operate within their respective frequencies and in accordance with all applicable laws and regulations. (b) Landlord will not grant, after the Effective Date, a lease, license or any other right to any third party, if the exercise of such grant may in any way adversely affect or interfere with the Communication Facility, the operations of Tenant or the rights of Tenant under this Agreement. Landlord will notify Tenant in writing prior to granting any third party the right to install and operate communications equipment on the Property.
(c) Landlord will not, nor will Landlord permit its employees, tenants, licensees, invitees, agents or independent contractors to interfere in any way with the Communication Facility, the operations of Tenant or the rights of Tenant under this Agreement. Landlord will cause such interference to cease within twentyfour (24) hours after receipt of notice of interference from Tenant. In the event any such interference does not cease within the aforementioned cure period, Landlord shall cease all operations which are suspected of causing interference (except for intermittent testing to determine the cause of such interference) until the interference has been corrected.
(d) For the purposes of this Agreement, “interference” may include, but is not limited to, any use on the Property or Surrounding Property that causes electronic or physical obstruction with, or degradation of, the communications signals from the Communication Facility.

9. INDEMNIFICATION.
(a) Tenant agrees to indemnify, defend and hold Landlord harmless from and against any and all injury, loss, damage or liability, costs or expenses in connection with a third party claim (including reasonable attorneys’ fees and court costs) arising directly from the installation, use, maintenance, repair or removal of the Communication Facility or Tenant’s breach of any provision of this Agreement, except to the extent attributable to the negligent or intentional act or omission of Landlord, its employees, invitees, agents or independent contractors.
(b) Landlord agrees to indemnify, defend and hold Tenant harmless from and against any and all injury, loss, damage or liability, costs or expenses in connection with a third party claim (including reasonable attorneys’ fees and court costs) arising directly from the actions or failure to act of Landlord, its employees, invitees, agents or independent contractors, or Landlord’s breach of any provision of this Agreement, except to the extent attributable to the negligent or intentional act or omission of Tenant, its employees, agents or independent contractors.
(c) The indemnified party: (i) shall promptly provide the indemnifying party with written notice of any claim, demand, lawsuit, or the like for which it seeks indemnification pursuant to this Section 9 and provide the indemnifying party with copies of any demands, notices, summonses, or legal papers received in connection with such claim, demand, lawsuit, or the like; (ii) shall not settle any such claim, demand, lawsuit, or the like without the prior written consent of the indemnifying party; and (iii) shall fully cooperate with the indemnifying party in the defense of the claim, demand, lawsuit, or the like. A delay in notice shall not relieve the indemnifying party of its indemnity obligation, except (1) to the extent the indemnifying party can show it was prejudiced by the delay; and (2) the indemnifying party shall not be liable for any settlement or litigation expenses incurred before the time when notice is given.

10. WARRANTIES.
(a) Each of Tenant and Landlord (to the extent not a natural person) each acknowledge and represent that it is duly organized, validly existing and in good standing and has the right, power, and authority or capacity, as applicable, to enter into this Agreement and bind itself hereto through the party or individual set forth as signatory for the party below.

8.1.a
Packet Pg. 44
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 6 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL (b) Landlord represents, warrants and agrees that: (i) Landlord solely owns the Property as a legal lot in fee simple; (ii) the Property is not and will not be encumbered by any liens, restrictions, mortgages, covenants, conditions, easements, leases, or any other agreements of record or not of record, which would adversely affect Tenant’s Permitted Use and enjoyment of the Premises under this Agreement; (iii) Landlord grants to Tenant sole, actual, quiet and peaceful use, enjoyment and possession of the Premises in accordance with the terms of this Agreement without hindrance or ejection by any persons lawfully claiming under Landlord; (iv) during the Term of the Agreement, Landlord shall not require Tenant to relocate or move any portion of the Structure or Communication Facility once Tenant has completed its installation, subject to an act, event, or circumstance beyond Landlord’s reasonable control, including but not limited to an act of God, or changes or enactments of any applicable federal or state laws that impact or affect Tenant’s use of the Premises; (v) Landlord’s execution and performance of this Agreement will not violate any laws, ordinances, covenants or the provisions of any mortgage, lease or other agreement binding on Landlord; and (vi) if the Property is or becomes encumbered by a deed to secure a debt, mortgage or other security interest, then Landlord will provide promptly to Tenant a mutually agreeable subordination, non-disturbance and attornment agreement executed by Landlord and the holder of such security interest.

11. ENVIRONMENTAL.
(a) Landlord represents and warrants, except as may be identified in Exhibit 11 attached to this Agreement, (i) the Property, as of the Effective Date, is free of hazardous substances, including asbestoscontaining materials and lead paint, and (ii) the Property has never been subject to any contamination or hazardous conditions resulting in any environmental investigation, inquiry or remediation. Landlord and Tenant agree that each will be responsible for compliance with any and all applicable governmental laws, rules, statutes, regulations, codes, ordinances, or principles of common law regulating or imposing standards of liability or standards of conduct with regard to protection of the environment or worker health and safety, as may now or at any time hereafter be in effect, to the extent such apply to that party’s activity conducted in or on the Property.
(b) Landlord and Tenant agree to hold harmless and indemnify the other from, and to assume all duties, responsibilities and liabilities at the sole cost and expense of the indemnifying party for, payment of penalties, sanctions, forfeitures, losses, costs or damages, and for responding to any action, notice, claim, order, summons, citation, directive, litigation, investigation or proceeding (“Claims”), to the extent arising from that party’s breach of its obligations or representations under Section 11(a). Landlord agrees to hold harmless and indemnify Tenant from, and to assume all duties, responsibilities and liabilities at the sole cost and expense of Landlord for, payment of penalties, sanctions, forfeitures, losses, costs or damages, and for responding to any Claims, to the extent arising from subsurface or other contamination of the Property with hazardous substances prior to the Effective Date or from such contamination caused by the acts or omissions of Landlord during the Term. Tenant agrees to hold harmless and indemnify Landlord from, and to assume all duties, responsibilities and liabilities at the sole cost and expense of Tenant for, payment of penalties, sanctions, forfeitures, losses, costs or damages, and for responding to any Claims, to the extent arising from hazardous substances brought onto the Property by Tenant. (c) The indemnification provisions contained in this Section 11 specifically include reasonable costs, expenses and fees incurred in connection with any investigation of Property conditions or any cleanup, remediation, removal or restoration work required by any governmental authority. The provisions of this Section 11 will survive the expiration or termination of this Agreement. (d) In the event Tenant becomes aware of any hazardous materials on the Property, or any environmental, health or safety condition or matter relating to the Property, that, in Tenant’s sole determination, renders the condition of the Premises or Property unsuitable for Tenant’s use, or if Tenant believes that the leasing or continued leasing of the Premises would expose Tenant to undue risks of liability to a government agency or other third party, then Tenant will have the right, in addition to any other rights it may have at law or in equity, to terminate this Agreement upon written notice to Landlord.

8.1.a
Packet Pg. 45
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 7 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL

12. ACCESS. At all times throughout the Term of this Agreement, and at no additional charge to Tenant, Tenant and its employees, agents, and subcontractors, will have twenty-four (24) hour per day, seven (7) day per week pedestrian and vehicular access (“Access”) to and over the Property, from an open and improved public road to the Premises, for the installation, maintenance and operation of the Communication Facility and any utilities serving the Premises. Notwithstanding the foregoing, Tenant shall Access the Premises only during ordinary business hours (8:00 a.m. – 5:00 p.m., Monday through Friday) (“Business Hours”) for construction and regular maintenance and repairs; provided, however, that Tenant shall have twenty-four (24) hours a day, seven (7) days a week Access to the Premises for unscheduled repairs and other emergency purposes, which shall be deemed to include any outage or failure of the Communication Facility. In the event Tenant needs emergency Access to the Premises outside of Business Hours, Tenant will give Landlord notice of such emergency Access as soon as practicable in light of the emergency circumstances. As may be described more fully in Exhibit 1, Landlord grants to Tenant an easement for such Access and Landlord agrees to provide to Tenant such codes, keys and other instruments necessary for such Access at no additional cost to Tenant. Upon Tenant’s request, Landlord will execute a separate recordable easement evidencing this right. Landlord shall execute a letter granting Tenant Access to the Property substantially in the form attached as Exhibit 12; upon Tenant’s request, Landlord shall execute additional letters during the Term. If Tenant elects to utilize an Unmanned Aircraft System (“UAS”) in connection with its installation, construction, monitoring, site audits, inspections, maintenance, repair, modification, or alteration activities at a Property, Landlord hereby grants Tenant, or any UAS operator acting on Tenant’s behalf, express permission to fly over the applicable Property and Premises in compliance with all applicable Laws, and consents to the use of audio and video navigation and recording in connection with the use of the UAS in compliance with all applicable Laws. Landlord acknowledges that in the event Tenant cannot obtain Access to the Premises, Tenant shall incur significant damage. If Landlord fails to provide the Access granted by this Section 12, such failure shall be a default under this Agreement. In connection with such default, in addition to any other rights or remedies available to Tenant under this Agreement or at law or equity, Landlord shall pay Tenant, as liquidated damages and not as a penalty, $500 per day in consideration of Tenant’s damages until Landlord cures such default. Landlord and Tenant agree that Tenant’s damages in the event of a denial of Access are difficult, if not impossible, to ascertain, and the liquidated damages set forth above are a reasonable approximation of such damages.

13. REMOVAL/RESTORATION. All portions of the Communication Facility brought onto the Property by Tenant will be and remain Tenant’s personal property and, at Tenant’s option, may be removed by Tenant at any time during or after the Term. Landlord covenants and agrees that no part of the Communication Facility constructed, erected or placed on the Premises by Tenant will become, or be considered as being affixed to or a part of, the Property, it being the specific intention of Landlord that all improvements of every kind and nature constructed, erected or placed by Tenant on the Premises will be and remain the property of Tenant and may be removed by Tenant at any time during or after the Term. Tenant will repair any damage to the Property resulting from Tenant’s removal activities. Any portions of the Communication Facility that Tenant does not remove within one hundred twenty (120) days after the later of the end of the Term and cessation of Tenant’s operations at the Premises shall be deemed abandoned and owned by Landlord. Notwithstanding the foregoing, Tenant will not be responsible for the replacement of any trees, shrubs or other vegetation.

14. MAINTENANCE/UTILITIES.
(a) Tenant will keep and maintain the Premises in good condition, reasonable wear and tear and damage from the elements excepted. Landlord will maintain and repair the Property and access thereto and all areas of the Premises where Tenant does not have exclusive control, in good and tenantable condition, subject to reasonable wear and tear and damage from the elements. Landlord will be responsible for maintenance of landscaping on the Property, including any landscaping installed by Tenant as a condition of this Agreement or any required permit.

8.1.a
Packet Pg. 46
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 8 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL (b) Tenant will be responsible for paying on a monthly or quarterly basis all utilities charges for electricity, telephone service or any other utility used or consumed by Tenant on the Premises. In the event Tenant cannot secure its own metered electrical supply, Tenant will have the right, at its own cost and expense, to sub-meter from Landlord. When sub-metering is required under this Agreement, Landlord will read the meter and provide Tenant with an invoice and usage data on a monthly basis. Tenant shall reimburse Landlord for such utility usage at the same rate charged to Landlord by the utility service provider. Landlord further agrees to provide the usage data and invoice on forms provided by Tenant and to send such forms to such address and/or agent designated by Tenant. Tenant will remit payment within sixty (60) days of receipt of the usage data and required forms. Landlord shall maintain accurate and detailed records of all utility expenses, invoices and payments applicable to Tenant’s reimbursement obligations hereunder. Within fifteen (15) days after a request from Tenant, Landlord shall provide copies of such utility billing records to the Tenant in the form of copies of invoices, contracts and cancelled checks. If the utility billing records reflect an overpayment by Tenant, Tenant shall have the right to deduct the amount of such overpayment from any monies due to Landlord from Tenant.
(c) As noted in Section 4(c) above, any utility fee recovery by Landlord is limited to a twelve (12) month period. If Tenant submeters electricity from Landlord, Landlord agrees to give Tenant at least twenty-four (24) hours advance notice of any planned interruptions of said electricity. Landlord acknowledges that Tenant provides a communication service which requires electrical power to operate and must operate twenty-four (24) hours per day, seven (7) days per week. If the interruption is for an extended period of time, in Tenant’s reasonable determination, Landlord agrees to allow Tenant the right to bring in a temporary source of power for the duration of the interruption. Landlord will not be responsible for interference with, interruption of or failure, beyond the reasonable control of Landlord, of such services to be furnished or supplied by Landlord.
(d) Tenant will have the right to install utilities, at Tenant’s expense, and to improve present utilities on the Property and the Premises. Landlord hereby grants to any service company providing utility or similar services, including electric power and telecommunications, to Tenant an easement over the Property, from an open and improved public road to the Premises, and upon the Premises, for the purpose of constructing, operating and maintaining such lines, wires, circuits, and conduits, associated equipment cabinets and such appurtenances thereto, as such service companies may from time to time require in order to provide such services to the Premises. Upon Tenant’s or service company’s request, Landlord will execute a separate recordable easement evidencing this grant, at no cost to Tenant or the service company.

15. DEFAULT AND RIGHT TO CURE.
(a) The following will be deemed a default by Tenant and a breach of this Agreement: (i) nonpayment of Rent if such Rent remains unpaid for more than thirty (30) days after written notice from Landlord of such failure to pay; or (ii) Tenant’s failure to perform any other term or condition under this Agreement within forty-five (45) days after written notice from Landlord specifying the failure. No such failure, however, will be deemed to exist if Tenant has commenced to cure such default within such period and provided that such efforts are prosecuted to completion with reasonable diligence. Delay in curing a default will be excused if due to causes beyond the reasonable control of Tenant. If Tenant remains in default beyond any applicable cure period, then Landlord will have the right to exercise any and all rights and remedies available to it under law and equity.
(b) The following will be deemed a default by Landlord and a breach of this Agreement: (i) Landlord’s failure to provide Access to the Premises as required by Section 12 within twenty-four (24) hours after written notice of such failure; (ii) Landlord’s failure to cure an interference problem as required by Section 8 within twenty-four (24) hours after written notice of such failure; or (iii) Landlord’s failure to perform any term, condition or breach of any warranty or covenant under this Agreement within forty-five (45) days after written notice from Tenant specifying the failure. No such failure, however, will be deemed to exist if Landlord has commenced to cure the default within such period and provided such efforts are prosecuted to completion with reasonable diligence. Delay in curing a default will be excused if due to causes beyond the reasonable control of Landlord. If Landlord remains in default beyond any applicable cure period,

8.1.a
Packet Pg. 47
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 9 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL Tenant will have: (1) the right to cure Landlord’s default and to deduct the costs of such cure from any monies due to Landlord from Tenant, and (2) any and all other rights available to it under law and equity.

16. ASSIGNMENT/SUBLEASE. Tenant has the right to Transfer this Agreement, in whole or in part, without Landlord’s consent only to (i) an Affiliate of Tenant, or (ii) any entity that acquires all or substantially all of Tenant’s assets located in the market, as defined by the Federal Communications Commission, in which the Property is located. Tenant also has the right to sublease or license the Premises, in whole or in part, without Landlord’s consent only to an Affiliate of Tenant. Tenant shall not otherwise have the right to Transfer this Agreement, or sublease or license the Premises and its rights herein, in whole or in part, without Landlord’s written consent. Landlord’s consent shall not unreasonably be withheld. Upon (1) notification to Landlord of a Transfer of the Agreement for which Landlord’s consent is not required pursuant to this Section 16, or (2) Landlord’s consent to a Transfer of the Agreement for which Landlord’s consent is required pursuant to this Section 16, Tenant will be relieved of all future performance, liabilities and obligations under this Agreement to the extent of such assignment.

17. NOTICES. All notices, requests and demands hereunder will be given by first class certified or registered mail, return receipt requested, or by a nationally recognized overnight courier, postage prepaid, to be effective when properly sent and received, refused or returned undelivered. Notices will be addressed to the parties hereto as follows:

If to Tenant: New Cingular Wireless PCS, LLC
Attn: Tower Asset Group – Lease Administration
Re: Cell Site No.: CVL01687
Search Ring Name: Patterson 2
Cell Site Name: Patterson 2 (CA)
Fixed Asset No.: 14758136
1025 Lenox Park Blvd. NE, 3rd Floor
Atlanta, GA 30319
With a copy to: New Cingular Wireless PCS, LLC
Attn: Legal Dept – Network Operations
Re: Cell Site No.: CVL01687
Search Ring Name: Patterson 2
Cell Site Name: Patterson 2 (CA)
Fixed Asset No.: 14758136
208 S. Akard Street
Dallas, TX 75202-4206
The copy sent to Tenant’s Legal Department is an administrative step which alone does not constitute legal notice.

If to Landlord: City of Patterson
c/o City Hall
Attn: City Manager
P.O. Box 667
Patterson, CA 95363
With a copy to: Churchwell White, LLP
Attn: Douglas L. White, Esq.
1414 K Street, 3rd Floor
Sacramento, CA 95814

8.1.a
Packet Pg. 48
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 10 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL Either party hereto may change the place for the giving of notice to it by thirty (30) days’ prior written notice to the other party hereto as provided herein.

18. CONDEMNATION. In the event Landlord receives notification of any condemnation proceedings affecting the Property, Landlord will provide notice of the proceeding to Tenant within twenty-four (24) hours. If a condemning authority takes all of the Property, or a portion sufficient, in Tenant’s sole determination, to render the Premises unsuitable for Tenant, this Agreement will terminate as of the date the title vests in the condemning authority. The parties will each be entitled to pursue their own separate awards in the condemnation proceeds, which for Tenant will include, where applicable, the value of its Communication Facility, moving expenses, prepaid Rent, and business dislocation expenses. Tenant will be entitled to reimbursement for any prepaid Rent on a pro rata basis.

19. CASUALTY. Landlord will provide notice to Tenant of any casualty or other harm affecting the Property within forty-eight (48) hours of the casualty or other harm. If any part of the Communication Facility or the Property is damaged by casualty or other harm as to render the Premises unsuitable, in Tenant’s sole determination, then Tenant may terminate this Agreement by providing written notice to Landlord, which termination will be effective as of the date of such casualty or other harm. Upon such termination, Tenant will be entitled to collect all insurance proceeds payable to Tenant on account thereof and to be reimbursed for any prepaid Rent on a pro rata basis. Landlord agrees to permit Tenant to place temporary transmission and reception facilities on the Property, but only until such time as Tenant is able to activate a replacement transmission facility at another location; notwithstanding the termination of this Agreement, such temporary facilities will be governed by all of the terms and conditions of this Agreement, including Rent. If Landlord or Tenant undertakes to rebuild or restore the Premises and/or the Communication Facility, as applicable, Landlord agrees to permit Tenant to place temporary transmission and reception facilities on the Property at no additional Rent until the reconstruction of the Premises and/or the Communication Facility is completed.

If Landlord determines not to rebuild or restore the Property, Landlord will notify Tenant of such determination within thirty (30) days after the casualty or other harm. If Landlord does not so notify Tenant and Tenant decides not to terminate under this Section 19, then Landlord will promptly rebuild or restore any portion of the Property interfering with or required for Tenant’s Permitted Use of the Premises to substantially the same condition as existed before the casualty or other harm. Landlord agrees that the Rent shall be abated until the Property and/or the Premises are rebuilt or restored, unless Tenant places temporary transmission and reception facilities on the Property.

20. WAIVER OF LANDLORD’S LIENS. Landlord waives any and all lien rights it may have, statutory or otherwise, concerning the Communication Facility or any portion thereof. The Communication Facility shall be deemed personal property for purposes of this Agreement, regardless of whether any portion is deemed real or personal property under applicable law; Landlord consents to Tenant’s right to remove all or any portion of the Communication Facility from time to time in Tenant’s sole discretion and without Landlord’s consent.

21. TAXES.
(a) Landlord shall be responsible for (i) all taxes and assessments levied upon the lands, improvements and other property of Landlord including any such taxes that may be calculated by a taxing authority using any method, including the income method, (ii) all sales, use, license, value added, documentary, stamp, gross receipts, registration, real estate transfer, conveyance, excise, recording, and other similar taxes and fees imposed in connection with this Agreement, and (iii) all sales, use, license, value added, documentary, stamp, gross receipts, registration, real estate transfer, conveyance, excise, recording, and other similar taxes and fees imposed in connection with a sale of the Property or assignment of Rent payments by Landlord. Tenant shall be responsible for (y) any taxes and assessments attributable to and levied upon Tenant’s leasehold improvements on the Premises if and as set forth in this Section 21 and (z) all sales, use,

8.1.a
Packet Pg. 49
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 11 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL license, value added, documentary, stamp, gross receipts, registration, real estate transfer, conveyance, excise, recording, and other similar taxes and fees imposed in connection with an assignment of this Agreement or sublease by Tenant. Nothing herein shall require Tenant to pay any inheritance, franchise, income, payroll, excise, privilege, rent, capital stock, stamp, documentary, estate or profit tax, or any tax of similar nature, that is or may be imposed upon Landlord. (b) In the event Landlord receives a notice of assessment with respect to which taxes or assessments are imposed on Tenant’s leasehold improvements on the Premises, Landlord shall provide Tenant with copies of each such notice immediately upon receipt, but in no event later than thirty (30) days after the date of such notice of assessment. If Landlord does not provide such notice or notices to Tenant in a timely manner and Tenant’s rights with respect to such taxes are prejudiced by the delay, Landlord shall reimburse Tenant for any increased costs directly resulting from the delay and Landlord shall be responsible for payment of the tax or assessment set forth in the notice, and Landlord shall not have the right to reimbursement of such amount from Tenant. If Landlord provides a notice of assessment to Tenant within such time period and requests reimbursement from Tenant as set forth below, then Tenant shall reimburse Landlord for the tax or assessments identified on the notice of assessment on Tenant’s leasehold improvements, which has been paid by Landlord. If Landlord seeks reimbursement from Tenant, Landlord shall, no later than thirty (30) days after Landlord’s payment of the taxes or assessments for the assessed tax year, provide Tenant with written notice including evidence that Landlord has timely paid same, and Landlord shall provide to Tenant any other documentation reasonably requested by Tenant to allow Tenant to evaluate the payment and to reimburse Landlord.
(c) For any tax amount for which Tenant is responsible under this Agreement, Tenant shall have the right to contest, in good faith, the validity or the amount thereof using such administrative, appellate or other proceedings as may be appropriate in the jurisdiction, and may defer payment of such obligations, pay same under protest, or take such other steps as permitted by law. This right shall include the ability to institute any legal, regulatory or informal action in the name of Landlord, Tenant, or both, with respect to the valuation of the Premises. Landlord shall cooperate with respect to the commencement and prosecution of any such proceedings and will execute any documents required therefor. The expense of any such proceedings shall be borne by Tenant and any refunds or rebates secured as a result of Tenant’s action shall belong to Tenant, to the extent the amounts were originally paid by Tenant. In the event Tenant notifies Landlord by the due date for assessment of Tenant’s intent to contest the assessment, Landlord shall not pay the assessment pending conclusion of the contest, unless required by applicable law. (d) Landlord shall not split or cause the tax parcel on which the Premises are located to be split, bifurcated, separated or divided without the prior written consent of Tenant. (e) Tenant shall have the right but not the obligation to pay any taxes due by Landlord hereunder if Landlord fails to timely do so, in addition to any other rights or remedies of Tenant. In the event that Tenant exercises its rights under this Section 21(e) due to such Landlord default, Tenant shall have the right to deduct such tax amounts paid from any monies due to Landlord from Tenant as provided in Section 15(b), provided that Tenant may exercise such right without having provided to Landlord notice and the opportunity to cure per Section 15(b).
(f) Any tax-related notices shall be sent to Tenant in the manner set forth in Section 17.

Promptly after the Effective Date, Landlord shall provide the following address to the taxing authority for the authority’s use in the event the authority needs to communicate with Tenant. In the event that Tenant’s tax address changes by notice to Landlord, Landlord shall be required to provide Tenant’s new tax address to the taxing authority or authorities.

8.1.a
Packet Pg. 50
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 12 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL New Cingular Wireless PCS, LLC
Attn: Tower Asset Group – Taxes
Re: Cell Site No.: CVL01687
Search Ring Name: Patterson 2
Cell Site Name: Patterson 2 (CA)
Fixed Asset No.: 14758136
1025 Lenox Park Blvd. NE, 3rd Floor
Atlanta, GA 30319
(g) Notwithstanding anything to the contrary contained in this Section 21, Tenant shall have no obligation to reimburse any tax or assessment for which the Landlord is reimbursed or rebated by a third party.

22. SALE OF PROPERTY.
(a) Landlord may sell the Property or a portion thereof to a third party, provided: (i) the sale is made subject to the terms of this Agreement during the Term of the Agreement; and (ii) if the sale does not include the assignment of Landlord’s full interest in this Agreement, the purchaser must agree to perform, without requiring compensation from Tenant or any subtenant, any obligation of Landlord under this Agreement, including Landlord’s obligation to cooperate with Tenant as provided hereunder. (b) If Landlord, at any time during the Term of this Agreement, decides to rezone or sell, subdivide or otherwise transfer all or any part of the Premises, or all or any part of the Property or the Surrounding Property, to a purchaser other than Tenant, Landlord shall promptly notify Tenant in writing, and such rezoning, sale, subdivision or transfer shall be subject to this Agreement and Tenant’s rights hereunder. In the event of a change in ownership, transfer or sale of the Property, within ten (10) days of such transfer, Landlord or its successor shall send the documents listed below in this Section 2222(b) to Tenant. Until Tenant receives all such documents, Tenant’s failure to make payments under this Agreement shall not be an event of default and Tenant reserves the right to hold payments due under this Agreement. i. Old deed to Property
ii. New deed to Property
iii. Bill of Sale or Transfer
iv. Copy of current Tax Bill
v. New IRS Form W-9 & CA FTB Form 590
vi. Completed and Signed Tenant Payment Direction Form
vii. Full contact information for new Landlord including phone number(s) (c) Landlord agrees not to sell, lease or use any areas of the Property or the Surrounding Property for the installation, operation or maintenance of other wireless communication facilities if such installation, operation or maintenance would interfere with Tenant’s Permitted Use or communications equipment as determined by radio propagation tests performed by Tenant in its sole discretion. Landlord or Landlord’s prospective purchaser shall reimburse Tenant for any costs and expenses of such testing. If the radio frequency propagation tests demonstrate levels of interference unacceptable to Tenant, Landlord shall be prohibited from selling, leasing or using any areas of the Property or the Surrounding Property for purposes of any installation, operation or maintenance of any other wireless communication facility or equipment. (d) The provisions of this Section 22 shall in no way limit or impair the obligations of Landlord under this Agreement, including interference and access obligations.

8.1.a
Packet Pg. 51
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 13 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL

23. RIGHT OF FIRST REFUSAL. Notwithstanding the provisions contained in Section 22, if at any time after the Effective Date, Landlord receives a bona fide written offer from a third party seeking any sale, conveyance, assignment or transfer, whether in whole or in part, of any property interest in or related to the Premises, including without limitation any offer seeking an assignment or transfer of the Rent payments associated with this Agreement or an offer to purchase an easement with respect to the Premises (“Offer”), Landlord shall immediately furnish Tenant with a copy of the Offer. Tenant shall have the right within ninety (90) days after it receives such copy to match the financial terms of the Offer and agree in writing to match such terms of the Offer. Such writing shall be in the form of a contract substantially similar to the Offer but Tenant may assign its rights to a third party. If Tenant chooses not to exercise this right or fails to provide written notice to Landlord within the ninety (90) day period, Landlord may sell, convey, assign or transfer such property interest in or related to the Premises pursuant to the Offer, subject to the terms of this Agreement. If Landlord attempts to sell, convey, assign or transfer such property interest in or related to the Premises without complying with this Section 23, the sale, conveyance, assignment or transfer shall be void.

Tenant shall not be responsible for any failure to make payments under this Agreement and reserves the right to hold payments due under this Agreement until Landlord complies with this Section 23. Tenant’s failure to exercise the right of first refusal shall not be deemed a waiver of the rights contained in this Section 23 with respect to any future proposed conveyances as described herein.

24. MISCELLANEOUS.
(a) Amendment/Waiver. This Agreement cannot be amended, modified or revised unless done in writing and signed by Landlord and Tenant. No provision may be waived except in a writing signed by both parties. The failure by a party to enforce any provision of this Agreement or to require performance by the other party will not be construed to be a waiver, or in any way affect the right of either party to enforce such provision thereafter.
(b) Memorandum of Lease. Contemporaneously with the execution of this Agreement, the parties will execute a recordable Memorandum of Lease substantially in the form attached as Exhibit 24(b).

Either party may record this Memorandum of Lease at any time during the Option Term or the Term, as the case may be, in its absolute discretion. Thereafter during the Term, either party will, at any time upon fifteen (15) business days’ prior written notice from the other, execute, acknowledge and deliver to the other a recordable Memorandum of Lease.
(c) Limitation of Liability. Except for the indemnity obligations set forth in this Agreement, and otherwise notwithstanding anything to the contrary in this Agreement, Tenant and Landlord each waives any claims that each may have against the other with respect to consequential, incidental or special damages, however caused, based on any theory of liability.
(d) Compliance with Law. Tenant agrees to comply with all federal, state and local laws, orders, rules and regulations (“Laws”) applicable to Tenant’s use of the Communication Facility on the Property. Landlord agrees to comply with all Laws relating to Landlord’s ownership and use of the Property and any improvements on the Property.
(e) Bind and Benefit. The terms and conditions contained in this Agreement will run with the Property and bind and inure to the benefit of the parties, their respective heirs, executors, administrators, successors and assigns.
(f) Entire Agreement. This Agreement and the exhibits attached hereto, all being a part hereof, constitute the entire agreement of the parties hereto and will supersede all prior offers, negotiations and agreements with respect to the subject matter of this Agreement. Exhibits are numbered to correspond to the Section wherein they are first referenced. Except as otherwise stated in this Agreement, each party shall bear its own fees and expenses (including the fees and expenses of its agents, brokers, representatives, attorneys, and accountants) incurred in connection with the negotiation, drafting, execution and performance of this Agreement and the transactions it contemplates.
(g) Governing Law. This Agreement will be governed by the laws of the state in which the Premises are located, without regard to conflicts of law.

8.1.a
Packet Pg. 52
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 14 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL (h) Interpretation. Unless otherwise specified, the following rules of construction and interpretation apply: (i) captions are for convenience and reference only and in no way define or limit the construction of the terms and conditions hereof; (ii) use of the term “including” will be interpreted to mean “including but not limited to”; (iii) whenever a party’s consent is required under this Agreement, except as otherwise stated in the Agreement or as same may be duplicative, such consent will not be unreasonably withheld, conditioned or delayed; (iv) exhibits are an integral part of this Agreement and are incorporated by reference into this Agreement; (v) use of the terms “termination” or “expiration” are interchangeable; (vi) reference to a default will take into consideration any applicable notice, grace and cure periods; (vii) to the extent there is any issue with respect to any alleged, perceived or actual ambiguity in this Agreement, the ambiguity shall not be resolved on the basis of who drafted the Agreement; (viii) the singular use of words includes the plural where appropriate; and (ix) if any provision of this Agreement is held invalid, illegal or unenforceable, the remaining provisions of this Agreement shall remain in full force if the overall purpose of the Agreement is not rendered impossible and the original purpose, intent or consideration is not materially impaired.
(i) Affiliates. All references to “Tenant” shall be deemed to include any Affiliate of New Cingular Wireless PCS, LLC using the Premises for any Permitted Use or otherwise exercising the rights of Tenant pursuant to this Agreement. “Affiliate” means with respect to a party to this Agreement, any person or entity that (directly or indirectly) controls, is controlled by, or under common control with, that party. “Control” of a person or entity means the power (directly or indirectly) to direct the management or policies of that person or entity, whether through the ownership of voting securities, by contract, by agency or otherwise.
(j) Survival. Any provisions of this Agreement relating to indemnification shall survive the termination or expiration hereof. In addition, any terms and conditions contained in this Agreement that by their sense and context are intended to survive the termination or expiration of this Agreement shall so survive.
(k) Standard Payment Direction Form/W-9/FTB 590. As a condition precedent to payment, Landlord agrees to provide Tenant with a properly completed (i) Standard Payment Direction Form of Tenant; and (ii) IRS Form W-9 and CA FTB Form 590, or their respective tax form equivalents, upon execution of this Agreement and at such other times as may be reasonably requested by Tenant, including any change in Landlord’s name or address.
(l) Execution/No Option. The submission of this Agreement to any party for examination or consideration does not constitute an offer, reservation of or option for the Premises based on the terms set forth herein. This Agreement will become effective as a binding Agreement only upon the handwritten legal execution, acknowledgment and delivery hereof by Landlord and Tenant. This Agreement may be executed in two (2) or more counterparts, all of which shall be considered one and the same agreement and shall become effective when one or more counterparts have been signed by each of the parties. All parties need not sign the same counterpart.
(m) Attorneys’ Fees. In the event that any dispute between the parties related to this Agreement should result in litigation, the prevailing party in such litigation shall be entitled to recover from the other party all reasonable fees and expenses of enforcing any right of the prevailing party, including reasonable attorneys’ fees and expenses. Prevailing party means the party determined by the court to have most nearly prevailed even if such party did not prevail in all matters. This provision will not be construed to entitle any party other than Landlord, Tenant and their respective Affiliates to recover their fees and expenses. (n) WAIVER OF JURY TRIAL. EACH PARTY, TO THE EXTENT PERMITTED BY

LAW, KNOWINGLY, VOLUNTARILY AND INTENTIONALLY WAIVES ITS RIGHT TO A TRIAL

BY JURY IN ANY ACTION OR PROCEEDING UNDER ANY THEORY OF LIABILITY ARISING OUT

OF OR IN ANY WAY CONNECTED WITH THIS AGREEMENT OR THE TRANSACTIONS IT CONTEMPLATES.
(o) Incidental Fees. Unless specified in this Agreement, no unilateral fees or additional costs or expenses are to be applied by either party to the other party, including review of plans, structural analyses, consents, provision of documents or other communications between the parties.

8.1.a
Packet Pg. 53
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 15 AT&T Site CVL01687 (Patterson 2) Option and Land Lease Agreement 9.13.21 FINAL (p) Further Acts. Upon request, Landlord will cause to be promptly and duly taken, executed, acknowledged and delivered all such further acts, documents, and assurances as Tenant may request from time to time in order to effectuate, carry out and perform all of the terms, provisions and conditions of this Agreement and all transactions and permitted use contemplated by this Agreement.

IN WITNESS WHEREOF, the parties have caused this Agreement to be effective as of the Effective Date.
“LANDLORD” “TENANT”
City of Patterson, New Cingular Wireless PCS, LLC,
a California municipal corporation a Delaware limited liability company By: By: AT&T Mobility Corporation
Name: Its: Manager
Its: City Manager
Date: By:

Name:

By: Its:

Name: Date:

Its: City Clerk
Date:

Approved as to Form:

By:

Name:

Its: City Attorney
Date:

8.1.a
Packet Pg. 54
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement EXHIBIT 1

DESCRIPTION OF PROPERTY AND PREMISES

Page 1 of 14 ends

to the Option and Land Lease Agreement dated as of _______________, 2023, by and between the City of Patterson, a California municipal corporation, as Landlord, and New Cingular Wireless PCS, LLC, a Delaware limited liability company, as Tenant.

The Property is legally described as follows:

Real property in the City of Patterson, County of Stanislaus, State of California, described as follows:

LOT 3E OF THE RE-SUBDIVISION OF PATTERSON RANCH - PHASE 3, AS PER MAP FILED MAY 27, 1999 IN VOLUME 38 OF MAPS, AT PAGE 53, STANISLAUS COUNTY RECORDS.

EXCEPTING THEREFROM: ALL OIL, GAS, CASINGHEAD GAS, ASPHALTUM AND OTHER,

HYDROCARBONS AND ALL CHEMICAL GAS, NOW OR HEREAFTER FOUND, SITUATED OR LOCATED

IN ALL OR ANY PART OR PORTION OF THE LANDS HEREIN DESCRIBED LYING MORE THAN FIVE HUNDRED FEET (500') BELOW THE SURFACE THEREOF, AND THE RIGHT TO GRANT LEASES FOR ALL OR ANY OF SAID PURPOSES; BUT WITHOUT ANY RIGHT WHATSOEVER TO ENTER UPON THE SURFACE OF SAID LANDS WITHIN FIVE HUNDRED FEET (500') VERTICAL DISTANCE BELOW THE SURFACE THEREOF.

ALSO EXCEPTING THEREFROM: ALL OVERLYING AND OTHER WATER RIGHTS, INCLUDING

WITHOUT LIMITATION, THE RIGHT TO APPROPRIATE WATER AND DISTRIBUTE IT TO OTHER

PROPERTIES WITHOUT ANY RIGHT TO THE USE OF OR RIGHTS IN OR TO ANY PORTION AND THE SURFACE OF SAID LAND. THE OWNER OF THE RESERVED RIGHTS, HOWEVER, COVENANTS THAT

IT WILL NOT EXERCISE THE RIGHTS RESERVED OVER THE SURFACE OF THE PROPERTY DESCRIBED ABOVE OR WITHIN THE SUBSURFACE OF SUCH PROPERTY ABOVE A DEPTH OF 100 FEET BELOW THE SURFACE OF SAID PROPERTY. BREACH OF THE FOREGOING COVENANT SHALL

NOT, HOWEVER, TERMINATE OR FORFEIT THE RIGHTS SO RESERVED, BUT INJUNCTIVE RELIEF MAY BE SOUGHT AND OBTAINED TO PREVENT OR REMEDY ANY SUCH BREACH.

APN: 021-070-002-000
The Premises are described and/or depicted as follows:
[Survey (rev 5) dated March 30, 2023, prepared by Geil Engineering, and consisting of one (1) page, appear on following pages]
Notes:

1. THIS EXHIBIT MAY BE REPLACED BY A LAND SURVEY AND/OR CONSTRUCTION DRAWINGS OF THE PREMISES ONCE RECEIVED BY TENANT.

2. ANY SETBACK OF THE PREMISES FROM THE PROPERTY’S BOUNDARIES SHALL BE THE DISTANCE REQUIRED BY THE APPLICABLE GOVERNMENTAL AUTHORITIES.

3. WIDTH OF ACCESS ROAD SHALL BE THE WIDTH REQUIRED BY THE APPLICABLE GOVERNMENTAL AUTHORITIES, INCLUDING POLICE AND FIRE DEPARTMENTS.

4. THE TYPE, NUMBER AND MOUNTING POSITIONS AND LOCATIONS OF ANTENNAS AND TRANSMISSION LINES ARE ILLUSTRATIVE ONLY. ACTUAL TYPES, NUMBERS AND MOUNTING POSITIONS MAY VARY FROM WHAT IS SHOWN ABOVE.

8.1.a
Packet Pg. 55
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement EXHIBIT 11

ENVIRONMENTAL DISCLOSURE
Landlord represents and warrants that the Property, as of the Effective Date, is free of hazardous substances except as follows:

1. None.

8.1.a
Packet Pg. 56
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement EXHIBIT 12

STANDARD ACCESS LETTER
[FOLLOWS ON NEXT PAGE]

8.1.a
Packet Pg. 57
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement Date: September 8, 2023
Building Staff / Security Staff
City of Patterson/City Hall
Attn: City Manager
Po Box 667
Patterson, CA 95363
Re: Authorized Access granted to New Cingular Wireless PCS, LLC (“AT&T”) Dear Building and Security Staff,
Please be advised that we have signed a lease with AT&T permitting AT&T to install, operate and maintain telecommunications equipment at the property. The terms of the lease grant AT&T and its representatives, employees, agents and subcontractors (“representatives”) 24 hour per day, 7 day per week access to the leased area.

To avoid impact on telephone service during the day, AT&T representatives may be seeking access to the property outside of normal business hours. AT&T representatives have been instructed to keep noise levels at a minimum during their visit.

Please grant the bearer of a copy of this letter access to the property and to leased area. Thank you for your assistance.
_______________________
Landlord Signature

8.1.a
Packet Pg. 58
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement EXHIBIT 24(b)

MEMORANDUM OF LEASE
[FOLLOWS ON NEXT PAGE]

8.1.a
Packet Pg. 59
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement Recording Requested By
& When Recorded Return To:

New Cingular Wireless PCS, LLC
Attn: Tower Asset Group – Lease Administration
1025 Lenox Park Blvd. NE, 3rd Floor
Atlanta, GA 30319
APN: 021-070-002-000
(Space Above This Line For Recorder’s Use Only)
Cell Site No.: CVL01687
Search Ring Name: Patterson 2
Cell Site Name: Patterson 2 (CA)
Fixed Asset No.: 14758136
State: California
County: Stanislaus

MEMORANDUM
OF
LEASE
This Memorandum of Lease is entered into on this _____ day of _______________, 2023, by and between the City of Patterson, a California municipal corporation, having a mailing address of c/o City Hall, Attn: City Manager, P.O. Box 667, Patterson, CA (hereinafter called “Landlord”), and New Cingular Wireless PCS, LLC, a Delaware limited liability company, having a mailing address of 1025 Lenox Park Blvd. NE, 3 rd Floor, Atlanta, GA
30319 (“Tenant”).

1. Landlord and Tenant entered into a certain Option and Land Lease Agreement dated as of _______________, 2023 (“Agreement”), for the purpose of installing, operating and maintaining a communication facility and other improvements. All of the foregoing is set forth in the Agreement.

2. The initial lease term will be five (5) years commencing on the effective date of written notification by Tenant to Landlord of Tenant’s exercise of its option, with four (4) successive automatic five (5) year options to renew.

3. The portion of the land being leased to Tenant and associated easements are described in Exhibit 1 annexed hereto.

4. The Agreement gives Tenant a right of first refusal in the event Landlord receives a bona fide written offer from a third party seeking any sale, conveyance, assignment or transfer, whether in whole or in part, of any property interest in or related to the Premises, including without limitation any offer seeking an assignment or transfer of the Rent payments associated with the Agreement or an offer to purchase an easement with respect to the Premises.

5. This Memorandum of Lease is not intended to amend or modify, and shall not be deemed or construed as amending or modifying, any of the terms, conditions or provisions of the Agreement, all of which are hereby ratified and affirmed. In the event of a conflict between the provisions of this Memorandum of Lease and the provisions of the Agreement, the provisions of the Agreement shall control. The Agreement shall be binding upon and inure to the benefit of the parties and their respective heirs, successors, and assigns, subject to the provisions of the Agreement.

8.1.a
Packet Pg. 60
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 7 IN WITNESS WHEREOF, the parties have executed this Memorandum of Lease as of the day and year first above written.
“LANDLORD”
City of Patterson,
a California municipal corporation
By:

Name:

Its:

Date:
“TENANT”
New Cingular Wireless PCS, LLC,
a Delaware limited liability company
By: AT&T Mobility Corporation
Its: Manager
By:

Name:

Its:

Date:
[ACKNOWLEDGMENTS APPEAR ON NEXT TWO (2) PAGES]

8.1.a
Packet Pg. 61
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement

LANDLORD ACKNOWLEDGMENT
State of California
County of _________________________________)
On ________________________________ before me, ________________________________________________, (insert name and title of the officer)
personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature __________________________________ (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

8.1.a
Packet Pg. 62
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement

TENANT ACKNOWLEDGMENT
State of California
County of _________________________________)
On ________________________________ before me, ________________________________________________, (insert name and title of the officer)
personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature __________________________________ (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

8.1.a
Packet Pg. 63
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement EXHIBIT 1 TO MEMORANDUM OF LEASE

DESCRIPTION OF PROPERTY AND PREMISES

Page 1 of 4 ends

to the Memorandum of Lease dated _______________, 2023, by and between the City of Patterson, a California municipal corporation, as Landlord, and New Cingular Wireless PCS, LLC, a Delaware limited liability company, as Tenant.

The Property is legally described as follows:

Real property in the City of Patterson, County of Stanislaus, State of California, described as follows:

LOT 3E OF THE RE-SUBDIVISION OF PATTERSON RANCH - PHASE 3, AS PER MAP FILED MAY 27, 1999 IN VOLUME 38 OF MAPS, AT PAGE 53, STANISLAUS COUNTY RECORDS.

EXCEPTING THEREFROM: ALL OIL, GAS, CASINGHEAD GAS, ASPHALTUM AND OTHER,

HYDROCARBONS AND ALL CHEMICAL GAS, NOW OR HEREAFTER FOUND, SITUATED OR LOCATED

IN ALL OR ANY PART OR PORTION OF THE LANDS HEREIN DESCRIBED LYING MORE THAN FIVE HUNDRED FEET (500') BELOW THE SURFACE THEREOF, AND THE RIGHT TO GRANT LEASES FOR ALL OR ANY OF SAID PURPOSES; BUT WITHOUT ANY RIGHT WHATSOEVER TO ENTER UPON THE SURFACE OF SAID LANDS WITHIN FIVE HUNDRED FEET (500') VERTICAL DISTANCE BELOW THE SURFACE THEREOF.

ALSO EXCEPTING THEREFROM: ALL OVERLYING AND OTHER WATER RIGHTS, INCLUDING

WITHOUT LIMITATION, THE RIGHT TO APPROPRIATE WATER AND DISTRIBUTE IT TO OTHER

PROPERTIES WITHOUT ANY RIGHT TO THE USE OF OR RIGHTS IN OR TO ANY PORTION AND THE SURFACE OF SAID LAND. THE OWNER OF THE RESERVED RIGHTS, HOWEVER, COVENANTS THAT

IT WILL NOT EXERCISE THE RIGHTS RESERVED OVER THE SURFACE OF THE PROPERTY DESCRIBED ABOVE OR WITHIN THE SUBSURFACE OF SUCH PROPERTY ABOVE A DEPTH OF 100 FEET BELOW THE SURFACE OF SAID PROPERTY. BREACH OF THE FOREGOING COVENANT SHALL

NOT, HOWEVER, TERMINATE OR FORFEIT THE RIGHTS SO RESERVED, BUT INJUNCTIVE RELIEF MAY BE SOUGHT AND OBTAINED TO PREVENT OR REMEDY ANY SUCH BREACH.

APN: 021-070-002-000
The Premises are described and/or depicted as follows:
[Three (3) Page Depiction of the Premises Suitable for Recording in Stanislaus County Appears on Following Page]

8.1.a
Packet Pg. 64
Attachment: AT_T_Site_CVL01687__Patterson_2__Option___Land_Lease_Agreement_9-21-23_Final_Executable (Enter into an agreement 1 CITY OF PATTERSON
Planning Commission Staff Report
AT&T Wireless Tower – Community Center
Conditional Use Permit #23-01, Negative Declaration #23-01 September 28, 2023 Meeting

PROJECT SUMMARY
Consideration of a Conditional Use Permit for an unmanned wireless facility (cell tower) located on the north side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive, 1025 West Las Palmas Avenue, APN 021-070-002. The facility would include an 84.9’ tall decorative bell tower, an 8’x8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. A draft Negative Declaration has been prepared noting that the project would not have a significant impact on the environment under the California Environmental Quality Act.

APPLICANT AND SITE INFORMATION
Applicant: New Cingular Wireless PCS
Property Owner: City of Patterson
Environmental Review: Draft Negative Declaration
Location: North side of W. Las Palmas Ave.,
approximately 125 feet east of Kestrel Dr.

Assessor Parcel Numbers: 021-070-002
Project Size: Approximately 900 sq. ft., excluding an access and utility easement
General Plan Designation: PQP, Public/Quasi-Public
Zoning Designation: PQP, Public/Quasi-Public
Present Use: Existing Vacant Space, Aquatics Center
Surrounding Land Uses: Aquatics Center, Community Center, Tilton Park, Commercial shopping center, Apartments

BACKGROUND
In January 2022, a similar item was presented to the Planning Commission for a cell tower of the same bell tower design at a location on the east side of Ward Avenue, approximately 500 feet north of the intersection with West Las Palmas Avenue. The Planning Commission adopted the Negative Declaration and approved the CUP with a 5-0 vote.

Since the project was located on city land, an agreement was subsequently submitted to the City Council for approval. Some councilmembers expressed concern that locating the cell tower as proposed could restrict development of the future Centennial Park site and the Council recommended that staff work with the applicant on an alternative site. This application represents that new site.

8.1.b
Packet Pg. 65
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) 2 PROJECT DESCRIPTION AND ANALYSIS
Conditional use permit review is used to determine whether land use is, and will continue to be, compatible with the current and potential surrounding land uses and to ensure that the use will not become a nuisance to the surrounding land users. Cell towers typically require a conditional use permit due to the potential for aesthetic and maintenance issues associated with a structure of this height and mass.

The project is an unmanned wireless facility, consisting of an 84.9’ tall decorative bell tower, an 8’ x 8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project would be located in a vacant 900 square-foot area near the southwest edge of the Aquatics Center. A minimal access easement would extend from West Las Palmas Avenue to provide all-weather access to the site.

The project site is located on City-owned property that currently includes existing facilities, such as the Aquatics Center, Hammon Senior Center, skate park, and Recreation Department offices. Tilton Park is located to the west.

Aesthetics
To conceal antennas and equipment as much as possible, the Municipal Code requires that all equipment shall be obscured from view or disguised, so as not to appear as telecommunication equipment. The City typically pursues towers disguised as palm trees, related to this requirement, however, in this instance, such a “mono palm” may look out of place. The proposed project includes a tower disguised as a decorative bell tower, and a solid wall to screen the ground equipment from view. The bell tower design was selected to blend with the architecture found in the community generally, and specifically with the surrounding Community Center buildings. The bell would be for aesthetic purposes only and would not be used to generate sound to avoid potential noise conflicts with neighbors.

To further reduce the potential aesthetic impact of cell towers on the skyline, co-location, or the placement of additional equipment on existing towers is encouraged through a staff level approval process. The proposed project includes space allowing for such co-location.

Noise
The project includes a generator to serve the facility during power outages. A noise analysis was prepared and reviewed as part of the environmental review. This study determined that the project would not generate noise levels that are considered significant.

Height
The municipal code allows towers to project a maximum of 15 feet above the maximum height outlined in the zoning district where it is located. The maximum height allowed in the Public/Quasi-Public Zone, where the project is located, is 50’. The 15’ projection would allow a maximum height of 65’. As noted, the applicant is requesting an 84.9’ tower.

8.1.b
Packet Pg. 66
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) 3 The Municipal Code (Section 18.84.050 and 18.84.070) also includes provisions, specific to wireless communications towers, allowing the Planning Commission to approve additional height, as long as the tower meets specific criteria:
1) The project is required to show that the additional height is required to provide a more efficient coverage pattern. The applicant has provided information illustrating the existing coverage gap in the localized area and how the tower would fill that gap.
2) The municipal code requires that only facilities that are totally enclosed within a permitted building shall be allowed within two hundred percent of the fall zone of the facility to any existing residential district within the City. The fall zone is considered to be equivalent to the maximum height of the tower. In this case, the nearest residence is more than 200 feet from the tower site, over the required distance.

ENVIRONMENTAL REVIEW
An initial study prepared for this project concludes that the project will not have a significant impact on the environment and a draft negative declaration has been prepared reflecting this.

ALTERNATIVE ACTIONS

1. Determine that the findings for the Negative Declaration, Conditional Use Permit can be made, and motion to adopt Negative Declaration #2023-01 and approve Conditional Use Permit #2023-01 subject to the conditions recommended in the staff report.

2. Determine that the findings for the Negative Declaration, Conditional Use Permit can be made, and motion to adopt Negative Declaration #2023-01 and approve Conditional Use Permit #2023-01 subject to the conditions recommended in the staff report with changes/revisions as may be submitted by the Commission.

3. Determine that the findings for the Negative Declaration, Conditional Use Permit cannot be made and deny Conditional Use Permit #2023-01.

FINDINGS

To adopt the Negative Declaration, the Planning Commission must find the following:

1. The project will not have a significant adverse effect on water or air quality or increase noise levels;

2. The project will not have a significant adverse impact on the flora and fauna of the area;

3. The project will not degrade the aesthetic quality of the area;

8.1.b
Packet Pg. 67
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) 4 4. The project will not have a significant adverse impact on traffic or land use;

5. In addition, the project will not:
a. Create impacts which have the potential to degrade the quality of the environment.
b. Create impacts which achieve short-term to the disadvantage of long term environmental goals;
c. Create impacts for a project which are individually limited, but cumulatively considerable;
d. Create environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly;

6. The Negative Declaration was prepared in compliance with CEQA and the CEQA Guidelines.

To approve the conditional use permit, including the additional height, the Planning Commission must find the following:

1. That the requested conditional use permit is consistent with the city general plan and the zoning code; and

2. That the establishment, maintenance, or operation of the proposed use or structure will conform to the requirements and intent of the zoning code; and that such proposed use or structure will not, under the circumstances of the particular case or as conditioned, be injurious or detrimental to the health, safety, or general welfare of persons or property in the vicinity of the proposed use, or to the general welfare of the city.

3. That the information provided demonstrates the height required by the Municipal Code is either infeasible or results in a less efficient development and coverage pattern.

RECOMMENDATION
If the Planning Commission feels that the findings can be made, staff recommends the following conditions:

1. That all conditions of approval shall be printed on corrected plans submitted for permits. The plans shall incorporate all changes resulting from these conditions of approval.

2. All construction shall be subject to the California Building Code and other applicable construction codes as adopted by the City of Patterson.

3. Vehicle access shall be, at a minimum, an all-weather driveway capable of accommodating emergency vehicles, and shall be maintained so that adequate site drainage is maintained, and no mud or silt is carried onto public streets.

4. That the project shall be subject to an encroachment permit.

5. All internal combustion engine driven equipment, including construction

8.1.b
Packet Pg. 68
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) 5 equipment and permanently installed power generation equipment, shall be properly maintained and tuned in accordance with manufacturer’s specifications.

Idling of all internal combustion engine powered equipment should be limited to ten minutes at any given time.

6. Any signal interference with the City’s SCADA automated system must be resolved at the expense of the current tower operator.

7. The project applicants shall provide on-air RF studies, within 60 days of activation of the telecommunication equipment demonstrating both FCC compliance and that the site will not interfere with any local signals.

8. All building utilities shall be underground at the point where they enter the equipment shelter.

9. Project grading shall not interfere with the natural flow or adjacent lot drainage and shall not adversely impact downstream properties. Grading plans shall indicate the amount of cut and fill required for the project, including any necessary retaining walls.

10. The project shall be properly maintained in terms of dust accumulation and chipped and/or faded paint, etc.

11. That any on-site illumination shall not be excessive and shall be directed into the site.

12. That the lessee and/or operator of the tower site shall provide a minimum of 30 days’ notice of proposed non-operation or abandonment of improvements at the site. Tower, antennas, and all support equipment shall be removed from the site within 90 days of such abandonment.

13. That a Construction Waste Management Plan shall be submitted to the Public Works Department for review and approval.

14. That a 2A:10B:C or larger fire extinguisher shall be installed at locations as specified by the Fire Chief or his/her designated representative.

15. All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover.

16. All on-site unpaved roads and off-site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant.

17. All land clearing, grubbing, scraping, excavation, land leveling, grading, cut & fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking.

8.1.b
Packet Pg. 69
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) 6 18. With the demolition of buildings up to six stories in height, all exterior surfaces of the building shall be wetted during demolition.

19. When materials are transported off-site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the top of the container shall be maintained.

20. All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions.) (Use of blower devices is expressly forbidden.)

21. Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizer/suppressant.

22. Within urban areas, track-out (earth material deposited on City streets by construction equipment) shall be immediately removed when it extends from the site and at the end of each workday.

23. Any site shall prevent carryout and track-out.

24. Limit traffic speeds on unpaved roads to 15 mph;

25. Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent.

26. Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site;

27. Install wind breaks at windward side(s) of construction areas;

28. Suspend excavation and grading activity when winds exceed 20 mph;

29. Limit area subject to excavation, grading, and other construction activity at any one time. Regardless of wind speed, an owner/operator must comply with Regulation VIII’s 20 percent opacity limitation.

30. Project shall install a Knox Key Box as required by the Fire Department.

31. That the project shall be subject to review and approval by the Stanislaus County Airport Land Use Commission.

8.1.b
Packet Pg. 70
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) 7 32. That the project shall comply with all applicable State and Municipal Codes, and meet the requirements of the Public Works Director, City Engineer, Building Official, Community Development Director, and Fire Chief.

33. That the applicant shall indemnify, defend, and hold harmless the City of Patterson, its agents, officers, and employees from any and all claims, actions, or proceedings against the City of Patterson, its agents, officers and employees to attack, set aside, void, or annul, any approval by the City of Patterson and its advisory agency, appeal board, or legislative body concerning the project, which action is brought within the time period provided for by the Government Code of the State of California. The City of Patterson shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. If the City fails to do so, the applicant shall not thereafter be responsible to defend, indemnify or hold the City harmless.

Respectfully submitted,
Joel Andrews
City Planner
Attachments
Project plans
Draft Negative Declaration
Initial Study
Environmental Noise Assessment
Radio Frequency – Electromagnetic Energy (RF-EME) Compliance Report Coverage maps
Central Valley Regional Water Quality Control Board letter Public Notice
-----

8.1.b
Packet Pg. 71
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) a
INITIATIVE / PROJECT: NSB
USID#: 324890
FA LOCATION CODE: 14758136
RFDS ID #: 5542661
RFDS VERSION: 3.00
RFDS DA TE: 03/07/2023
PACE JOB#: MRSFR053894
PTN#: 3701AOKTMF

PROJECT DESCRIPTION
A (N) I\T&l UNIAANNED TELEC0\41AUNICATION FACILITY CONSISllNG OF INSTALLING· (N) LEASE AREA W/ (N) WIC (WAUHN-CABINEl), & (NJ OIESEL GENERATOR, & (N) UTILITIES TO (N) SITE LOCATION , {N) BELL TOWc:R W/ (N) MHENNAS & ANTnlNA EaUIPIAENT INSIDE

PROJECT INFORMATION
AT&T SITE NUMBER: CVL01687
AT&T SITE NAME: PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363
JURISDICTION: CITY OF PATTERSON
APN: D21-070-002
SITE TYPE: WIC (WALK-IN CABINET)
/ BELL TOWER

VICINITY MAP
~ ~, ·•
' ·~ - Q
. ' / 1
~
SIT_~ LOCATION~
~ , ~
. ~ 9 9
~- \
\\ ~ 9 :

CODE COMPLIANCE All WORK & IAATERIALS SHAU RF PERFORMED & INSTALLED IN ACCORDM-JCE \',1TH Tl-ff CURRENT EDlllONS or THE f'OLLOIYING COD[S AS ADOPTED BY HI[ LOCAL GOVERNING AUTHORITl[S NOlHING IN THESf PLANS IS TO BE CONSTRUED TO PERIAIT WORK NOT CONFORMING TO lHESE CODES:
20:n CALir RNIA AOMINISTRMIVE CODE, PARI 1, TITLE 24 CCR 20n CAI lr RNIA llUlt DING COO[ (CllC). PART ], VOi.UM[ l&;l, nm ◄ CCR (7021 INTERNATIONAL BUILDING CODE J..ND 2022 CAlir RNIA A\4ENOM[NTS) 7022 CALlfORNIA [l[CTRICAL CODE (C[C), PART J, TITLE 24 CCR (2020 "-IATIONAL [L[ClRICAL CODE AND 2022 CAUrORNIA AM[NDIA[NTS) 2022 CAL!r RNIA MECHANICAL CODE {CMC) PART 4, TlTLE 24 CCR, (2021 UNIFORIA "4ECHANICAL COOE ANO 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA PLUMBING CODE {CPC), PART 5, TntE 24 CC R (2021 UNIFORIA PLUMBING CODE ANO 2022 CALIFORNIA A"4ENOl.mns) 2022 CALIFORNIA ENERGY COO[ (CEC), PART 6, TITLE 2~ CCR 2022 CAUr RNIA FIRE CODE. PART 9, TITLE 24 CCR
SITENAIAE:
smr
COUNTY:

PATTERSON
CVL016B7

STANISLAUS
CITYOFPAllERSON
021-070-002
~ . \ \ SHE A.CQUISITION COMPANY: COMPLETE
2009 V SlREEI WIRELESS CONSULTING I ~
SA.CRAMENfO, CA 95818
LEASING CONTACT AWi ROCKY CORDOVA ·\ \
(2021 INTERNATIONAL FIRE CODE AND 2022 CALIFORNIA Aij[NDMENTS) 2022 CALIFORNIA GREEN BUI\.DING STANDARDS CODE, PART 11, TITLE 24 CCR 2022 CALIFORNIA REFERENCED STAN01.RDS, PART 12, TITLE 24 CC.R ANSI/EIA-TIA-222-H
ALONG wrn-t ANY OTHER APPLIC1.BL[ LOCAL & STATE LAWS AND REGULATIONS JURISDICllON;
APN
sm:A00R[SS:

CURRENT ZONING:

CONSTRUCll0NTVfl[:

OCCUPANCY TYPE:

POWER·
LJ,TITUDE:

LONGITUDE:

GROUND ElEVAIION:

PROPERTY OWNER
APPLICANT:
1025 W LAS PAUAAS AV[
PATlERS0N,CA95J6J
0/0P /PUD (PUBLIC / OUASI-PUBUC-PLANNEO
UNIT DEVELOPl,lEfH)
V-B
U, (UNI.IANNEO COIAIAUNICATIONS FACILITY)

IURLOCKIRRIGATIONDISTRICT
N JT 28' 0077" NAD SJ
N37466882'NAD8J
I lfr Off ,ll,,0' WiD U W 121 H2557k N/\D 8J
119' AMSL

CITY OF PATTERSON
P,O, BOX 667
PAT1ER50N,CA9536J
.I.T&T MD111LITY
5001 mcUTJVEPARKW.I.Y
SAN R.I.YDN, C.I. 9458J
(916)616-0468 , 1 RCOROOVACCOMPLETE'MRELESSNET ,_ ______________________ -4 ZONING CONTACT: ATTN t.lATT MOOR[
CONSrRUCIION CONTACl·
{916) 247-JOH

MMOORECICOMPLETEWIRELESSNET

BECHTEL
KEllHCONNER
(40B)JD6-JBOI

CKCONNEROBECHTCL COM

DRIVING DIRECTIONS
F'ROl.l· 5001 EX[CUTIVE PARKWAY, S/\N RAMON, C.f. 945BJ TO: 1025 W LAS PAL\4AS A\/f., PATTERSON, CA 9536)
1 IIEAD SOUTIIOCST
2 TURN RIGHT
J TURN LEFl TOWARD EXECUTIVE PKWY
4 TURN RIGHT TOWARD EXECUTIVE PKWY
5 TURN RIGH [ ON ro EXECU11Vt PKWY
6 TURN RIGHT ONTO CAMINO RAMON
7 USE THE RIGHT 2 LANES TO TURN RIGHT ONTO BOLLINGER CANYON RD 8 US[ TIIE RIGIIT LAN[ TO "4ERC[ ONTO I-6B0 S \11/1 nic RA"4P TO SAN JOSE 9 "4ERGEONTOl-6BOS
10 USE THE RIGHT 2 LANES TD TAKE EXIT JOA 10 MERGE ONTO I-SBOE

TOWARD STOCKTON
11 1 TAKE THE INTERSTATE 580 EXIT TOWARD INTERSTATE 5 S/FRESNO/lOS ANGELES 12 CONTINUfONTOl-5BOE
l J ~C',(TOH1~l11
11, TAKE EXIT 04 TOWARD SPERRY AVE/DIABLO GRANDE PKWY
15 TURN LEFT ONTO CA-lJO
16 TURN LEFT ONTO W LAS PALMAS A.VE
17 TURNlEFT
18 TURN LEFT
END AT: 1025 W LA.S PAUAA.S AVE, PAl1ERSON, CA 95J6J
ESlllAAITDTI"4E:571.lINUlES ES1IMA1EODISTANCE:576"4ILES JJrT
J12 H
164FT
295FT
021.11
06"41
051,41
021,41
~ 0 1,41
2051.11
I81.ll

15..1 Ml
119 Ml
02"41
20MI
OJI.II
171FT
128FT

DISABLED ACCESS REQUIREMENTS
IHIS FACILITY IS UNMANNED & NOT FOR HUI.AAN HABITAllON DISABLED ACCESS & REOUIRE"4EN[S A.RE NOl REQUIRED IN /ICCORDANCE 'MTH CALIFORNIA STATE BUILDING CODE, TITLE 24 PARl 2, SECTION 118-2035 SHEET
T-1.1
C-1
A-11
A-1.2
A-21
A-J 1
A-41
A-'12
E-11
0"5ClilPTPU

TITLE SHEET

TOPOGRAPHIC SURVEY

OVERALL SITE PLAN
EQUIPMEN1 PLAN

ANTENNA PLAN

ELEVATIONS

ANTENNA DETAILS
EQUIPMENT DETAIi S

ELECTRICAL PLAN
SHEET INDEX ~Ell I SH<ET Dt 1rn~
CVL01687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
fo~~
0 ~!~~~.':.,';~..,~~r~i
,-=
CDIIPl.ETE ~ W'll'llMt c.w.iloltlh~l, lfllt.
.UU SIIENO C~'\CllW
PROJECrNO:
0t.41\11j,l'J l •. 11tWAJII
c:Hl!,~ra:ii n 1, 01'.J\'¥
.,UP'tc,ifft.111'
'O.\U~~J.t.J\n,
I
I
, oiiMmh=Wt111![\t ,;:;;_
, rt>l'»m ID lCO,. tc
l w:1UD lct•U11:W ,I.C
c 11i,iiun , .... ,.,, M a!i I lll..i.lin-1n ,,.

PRELIMINARY:

NOT FOR

CONSTRUCTION
!([VIN R SORENSEN
54469
7 I • ~i]:;;r,·.~:1:.~ia~.~fii~:'.: l..CME••o~,,"'"''occ""'''" ··, • :l::;t:°!! - \lm •
:, ;5~! ~J.
~ ,I ·~• C;:i ''ff ~ I
.,.,1 == ·•! •·· '
·;J~ " I
. -== _;; "'"l ' Ill &~ "e I· ·ruP. ,· i - ~,5@ I u l I I I , I)! 1 H!l - · . ~u; . r!ill ;
!:'MU'Tflfl!:

TITLE SHEET
L I ~· .. r ~1.1

8.1.b
Packet Pg. 72
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and Q
I
,......
- -.«
'" ~
-------
dVLo 1887 Patter~on

PLOT PLAN AND
'8TE TOPOGRAPHY
\,
~at&t
,_,,MOBILITY
. j i ~~ §
,'/ ! i~ I gij ~
no j !i?. g
~:~ /a E
! !
- J:: l
~~ij ~ ~
p 2 0
I ~ ~
'-. ~ m
t
~
~
II
0 l

8.1.b
Packet Pg. 73
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) N01£: NO TECHNICIAN PARKlt,H, AT SITE
l.'IJST PARK IN PARKING LOT & WAU(
TO Sll[ FROM PARtUNG LOT.
-------------
{[) BUlDING
APN:
021 - 070- 001 j
!Ji
te l
II
I
I
I
(N) ,\T/.d 20'-o• l\lOE

NON-EXCLUSIVE ACCESS
&: UTILITY EASDAENT
I .4.l&-T TO SUPf'lY &: INSTALL (N) 4" SCH 40 PVC COOIXJll IN J6" OC[P TROICH sru6BCD OUT or mANSllJRU[R PAD
W/ POl'i£R ~l<[R O DI> CF COHDUIT
I
I
AT&T TO l0CA1[ rns11m: 4• CONDUIT /;
'~ / / iii:

SlUB,
INSTALL CONNECT {N) 4" 4" SCH CONOIJIT 40 P\JC & CONOUJT SUPPLY :A 1N59"0££PTRENCH8[l'M:EN ~
1AA.IHORl,ICRPAO&:C0001.JITST\J9 \ \
~ , , ,._ ... (E) 10'-0"'MOEPUBUCUTILITY ~ ,
USCM[IIT PCR 38/UAPS/53 ~~~\.._ __ iJ~--.;:;. i!, ~
AT&T TO SUPPLY & INSTALL (N) ~&"X~"
ffi'.NSrORU[R PAD Vf/ 13.1.FlRICR POST
Ar&l lO SUPl'L '!' & INSU,LL (N) 2" SCH. 40 PVC CONDI.Ill W/ 2/0 mlPLEX IN BETWEEN (N) TRANSFORI.IER PAD & (N)
IAETER PANEL IN (N) J6" DEEP TRENCH, APPROX, 60'
(N) Al&l J'-0V1'-o" U/G VAULT W/ mAmc
RA TrO l 10 roo rem "U[[l I.![" POINT & (N)
,H&:T naER POC
SHEARWATER DRIVE 0
'• r:----- f'O"l•IYL'I...:.....__.,_ - - -- - - ::) ---~ --------=.::::::_-_ _.:::-_:_: __ "\-.. : _____ ~ --7------Q_ . .. ,tt,,.,,.< ~~-l£!:{U.!1tt ,ti J.e~-~/U
, 0• WI!)( PUBLIC
(U11~~TY [Ai~~:5;~~
APN:
021-070-002
T(Olt.fOlN P.&RKING
SPiit[
i
(P) AT.T NOHXClUSVE
{[)BUI.DI~ ~ (N)~Tdi:T 10·-o·moc l!Otl-[XaUSIVE ACCESS
& UTILITY [ASEUENT
(E)lRANSrQRM(R
([) PAD ,ou,n:o~ - DROP lRAMSFORI.IER rr, I lt-r..El
I
I
I ~ , : , .... , ....
'I
([) DROP INlCT =
\'}
// / c::::::=JD , , ,, ,' , , ,r ,'
I
I
I
J
"\_(() S"'1EPARK'\_
-------- --------
• .
• •

LAS PALM AS A VENUE
lw
15 If-
~ OVERALL SITE PLAN l" 0'-0 '
~ "'
I
I I
I eo· o· (t_ Ol"·.,,-r
r
~ '.'.!
<(
51 el:

CVL01687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
$c,~.:!,~~~::'!~du
CDnPLETe ~ Wlreln, Coneultlno, Int.
·,H l 1fflfl'f0 OWlW
,.-oJt-tf'«i>
CI U ff'-111 f.J,11.1,¥.1 11'1
CHECUD BY. J. GRAY
,IINCl'YIO .. ,
DI.UUIA.!Ul-
""' ~ x..,o•
·-
PRELIMINARY:

NOT FOR

CONSTRUCTION
KEVINR SORENSEN 54469
~I<~ , n<A1DN 0'•1'.W!O,,.,I\ P(e()N.
'"lW "'l•~"!•cr.,cu,a•ouf Uttc •o-.or,.,c:,.uo-«11fl:"..0W1 f,r,tlOlf• IO"-!ll•locoocUtJ11• ..
=-f.·1 i ii:! .:::::,
-~
!!
~ "
1J1tnm•t.
• - 111!1 ~~; ,;ii
•!- :Iii, ,., ;J" Vi !l1i1
,; , l' jl •h I~ i!! I ·u,! t!o ,h, ]~~ •Hll
.~; i,,,11 i w II

OVERALL

SITE PLAN
[ ""'"~A~ 1 . 1

8.1.b
Packet Pg. 74
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and (t,i) 8Ell TOWER "'/ (U) AT&.1 ANlHlNAS
& ANl[NSA [OUIFl.t[NT INSIOC. sec AUlCNIJA FLAli, Stl[ET A-2 1 (tl) ROCK W/ 'MID OARlll[R
THROUGHOOT l[A.S[ AR[A
{II) 41&1 l[CH LIGHT
(N)10·-o·xs·- o· CONCRETE GENER,\lOR SL/1.8
(N))OKWOIESELGENERATOROtJ 190 GALLON UL H2 RATED FUEL TANK & I E\JH 2 ACOUSTIC [NQOSUR[
(N)Al&.l JO'-O"XJ0'- 0"
(900 SO Fl) LEASE A.REA
,~·-o·
(N) AT&T UTILITY H-FRAVE AlTr\CHED 10 \I/IC (WALK-IN CABINET) W/ {N) R,\YC,.,P DC50 SURGE SUPPRESSION BOX, {N) FIBER Pl.Al CAN & {N) 2A:ro8CRr\TEOFIR[EXTIOOJISliERIN\\£AMRRESISTANTCAB:NET
+--------------------,0·-o· •
r 6."-1----------u· rr-----------+-- -t-s·+-,,4---- -
' ' ' ' '
--------------------------------:
' , (◄) (N) 4l&l nern TRUNK CABLIS
', & (12) (N) AT&T DC POWtR lRUNK
, CAOL(S A TTACHCD 10 (N) BELL .A
',,, TOll{R WALL tlSIIJ[ TO ANTENNAS ----;"
..... ,✓
', ,' ' , ', ,~ ' ,
I
I A- --- 1
I
I
' I
: I
I
I , ,,
,r
I
I
I •
', ~' I
>< : , ' 1 , ' I
/ ~ I
,," ',.. : , ' I
,' ', I , .,. I
,/ ',, : ; /,,,, ,,____ l 1 'l_,.
," , .. : f5 !------!
(N) HI/AC UNIT PROVIDED
W/ 'l'tlC [WALK- IN C/..Bf.lIT)
(N) SHl[LO[O OONil llLT LIGHT WITH WTIOH
SENSOR & AUIO SI IUTOff TUCR PRWOEO
l'ITTH WIC {W.UK-tl CAllllO). l'IP or (1)
(N} AT&l GPS ANIENl<IA
(N)RFRACK l 2
---(N)RFRACKfl
(N) POWER l"I.ANT RA( K W/ (2) STRINGS

OF BATTERIES
(N) AT&T WIC (WALK-IN CAGIN[l)
ON (NJ 6'-0·1s·-o· CONCR[T[ SL.AB
(N}.4.T&l 200A [L[ClRICAL PANEL
W/ ATS & (Al,I LOCK LUC BOX
{N) ACCESS OOOR ;;' ', I ~ L , ' I I , P---~---11----~~---""- ' : •·-0-- ',1 a: q' Q. (N) J'-o· X 4'-o· CONCRETE STOOP
,·
----------------4 ~ / I (N) .I.TltT 4· U/G CONDUIT, A / O • ,I.PPROX 25' FRO~ CIEW. W/ '7 I lELCO BOX BELO\\' 10 mo f5 <;> / PUll C4.N ~ SHELTER ¥.'ALL vV {Nl AT&T J'-o· c.
_.,,,., ,,,,- I """"" --......... ,l
~,,.,,....• ; "'
/ "
"
~ Y, , .., . ,,,, A~/\ I I 1 1 \ ti
M ATltT U/G GENER.ATOR ")t CONDUITS, Arl'RO:< JO' I ---- "tl381.:l - ~381.:l (N) Altl ~· U/G COUOUH FCft Q. ...-----nee~ r1arR FROM POC TO (N) ClfNA. W/ \ _,,;) lCLCO BOX BELON, 4?1'ROX 25'~~
0 ------/ - / _,,,'
L ,-1- ~ "1 i '
. " ,, \ I I , \ c..

I I I , ' \ I ~ w
• / \_ c.. ~ ~ , --- {N) FIR[ O[ PARTU HIT • , , ' r.1mxoox 11 •-r 1 • u·~•· '- ··•· I ,.,' ':i,_ «. I I ( / ~@ I (N)AT&:T12-0"~1DEDOUBLE
~ ~ _,.,- r~-- ~ !~~NE~:~;~/0R~~~~~:;;:L
(N) AT&T J"-o· CLEARANCE
(N) AT & T 2" U/G COHOUIT FOR
PO\l,'ER FROU (tl) ~[T[R PANEL TO
(N) (l[ClRICAL PANt:l, APPROX 10'
(N) UlllllY H- FRA.W: W/ (H) All.ti
21l0AMP METER PM£l W/ DISCOtl-l[CT
& (N) C{ NA, W/ TElCO 80:< BELOW
(N) AT&T 6'-0" TALL CIJU WALL
, * ~-~•~ IP MEN T PLAN ::~'~,:~; t1~"1::ic,r,:~~"1'" \ji7 1 (N) IRAUSf"OklJ!:R PAO .t (II) WE IER PAW£l K)-«L..5 T r IN (N) J6" O[lP IR(IICH, Af'PROIC 60' ~IIM ' \.'11'
CVL0l687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
h•~~'~!~~~~:,t-.;~l
CCflFLETE ~ W4• it.1Nt CoNU~t,.loO..
.,,_ILi 111-lnb aiutlW
rtOJl;Ct tllO
OIAfflf U l,J J'EW~ ~J
Qill~• r I. GiA't
Allffl'(f?IIIT •
1'1Ulfl lA.,Ul,
·-

PRELIMINARY

NOT FOR

CONSTRUCTION

KEVINR SORENSEN
S4-¢69
,c, \U,< l p-io, l ~I\ 109 >>S, P(P..0-,
u,• fS"llll•>'l>C"OC U'ICUh•
~ (C11:,J! Of> ICf •t:.1 0 NOllf!:O•IO I

1..c.u1• •0 •,11• 11 ir.[JQ(; uo.mn
. - ... ~~ !
. ~a ~ ;:,tll it ~Ii ·a Ji
~;!!! .\· ; id S!' .___ I ,, I .z::;; cl!~ : i .l
,...,1111.1

EQUIPMENT
PLAN
['"W~A~1.2

8.1.b
Packet Pg. 75
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and (N) ATkl RRUS - 684J 82/866.\. IW
Of 6, Off (H) UtUSlR\Jl eELOW
AHTENf.lAS
SECIOR
Al Al
~ I /1:J
~ I A.:l
RI
82 8]
G Cl
A
" C1
" A CJ
D D1 [
l D1
.

T
DJ
AHlENNA. UOOU NO
CCI - IPA- 5R-KU8.\11-K
ERICSSON AIR5419 077G & AIRG40 8770
CO .. TPll-45R-l<UBAA-K
CCI • IPA-45R-KUBAA-K
ERICSS0NAIR6419B77C&AIR644987i0
CCI • 1PA-~5P-KUBM-K
CCl • TPA-45R-KUl!AA-K
ERICSSON AIR6419 877C ,le >lf~6449 8770
ca - 1PA-45R-KUBAA-K
CCI TPA-45R-KU5AA·K
ERICSSON A\R6419 877G & AIR6H9 A7m
CCI TJIA-451!-KUSAA-K
(N) Rf SCHEDUlE
I A.111.!UIH CENIERUIE I RRUt-0'5 111:l,IOOtL #
-rn·-o· IU) 4_44!1 BS/e12. (I) BB4J 87/B66A
t 76'-9" & ±7J'-2°IINTEGRATED
±1 ·-o· 10, •u1_~11 _(!)_ s&U OJ/IM,>
,,. tU'-0'" l( 1) _!449B5/B11,(1)BA4J87/866A
,,. t75'-9" & ±7J'-2'l1NTECRATED
270 +H·-o· l(IJ ~.u@ m\ [•> ~•l .,,.~u.
"" ±1 '-o" H1J 444!1 BS/812, (1J BB,:s B2/B66A
''" t76'-9" & ±7J'-2'IINTEG!UTED
180 :t74'-0" 1(1) 478814, (1) BB J 82/A66A
.. Hf-o" lr,1) 449 e~/812. (1) 88 :3 B2/1366A
,. t76'-9" & :flJ'-2' l!NT[CRAT[D
"' :t7f-O" {1) 478B14,(1)68 J82/B 66A
RrDS OAT[ 0l/ 01/23
RrDSRCV J OO
(N)FRPTUB(COlU!AN,TYP
(N) FRP TUBE GIRT ABOVE & B£LOW
ANl[NNAS,TYP(FRPlUBEGIRlABOVE
ANlENNASNOlSH0MlFORQARITY)
--~:IV- ) (N) Al&l FIBER IRUNK CABLES
"p==----Fl---,====,ef="'F"=-===== ... 1/1 ~A~~~)s(~;T:~:o~/(N):c~~UN~ I T0'N[P. WAf.L \~D[ TO ANT[NN/,S ~""270'

SECTOOB
(1-J)FOAl.!ROOfA!IO\'[,lOB[
DCSIGNCD ~ [NCI.NE(R[O DY OTH(RS
r-2·
h P
~
~
;,z •1u j;;
...

ANTENNA PLAN
if•(·O"
T•'f
,.,,.
' I
I
I
L-,""
1 I
I
I
•, I
-----"'
~ ~ ( i
Alli.I~

SCCTORD
(2) (N) AT&T AN'JENHAS

VCRTICALLYSTACKEOTHIS
POSlllON ONLY, TYP EACH SEClOR
(N)ACCESSHATCH
'~" ,r...,~• rc:-c1 r:.t,NH ""'" l~'!-!1' 3.1~<:0ll~or .. ~ ' '"' lll o<> I • I •
'""'' SHARED 51!,IJi[D
S11,V!CD SIIARED Sll-~(0
' '""' (l)DC9
SH,IJiED SHARED SHARED
SH,iJiED SHARED SHARED
' .... (l)DC9
SIi.iMO Sl!ARLD SIIARCD
''"'"' SHARED SHAR(O
,,., (l)OC9
"""" ""'" """ ""'"' SHARED """ NOIE:

I ANlEh'l,/A POSITIONS Al![ un TO l!IGHT rRou rRONT Of" IJH[NMA. 2_ £OOIPIA[NT IS PREllUt.A.RY & SUOJ(CI TO CHANCC
CVL01687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363
PREPARE0FOR
~at&t
!,a~.:.!::~~r!: .. ~~ln
\'.,.;ricr

CCXIFLETE
~ Wlreleu Con ultlng, Inc,
CYl.OlMJ
lURY.UI
J,0,l'A1
tatlffl-'Wl
i c..,._
PRELIMINARY:
~IOT FOR

CONSTRUCTION
l<E\111-J R SORENSEN S4469
n1<,vpv11:mo,1~w,o•,in"IO::Oi'< u,~ rs: ,~[• ~oe ~c••,c; u,,:11• 11~ r..- 1c1a.m ~ 11C:lrQ0 ,..,,r-::;,c.,~, (..e;OJl[OID , .. IO l ~O...C .... \l o,! I
:

I-"ll I ·; :
=
. -
~i!! ,ii!
•:-
!~~
ii! tp
•<I
~~r
~8!
i!;[i I"!' di'! 11,l!
·'JI' !Ml
11!1!
!l!li
dlll

ANTENNA PLAN
~HEHNU~BO
A-2.1

8.1.b
Packet Pg. 76
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and (:1) ROOF ~,'(tH
(N) FAN IUS()( W/
TEW'ERAnJRE SEIJSOR &
~UTOUIITIC GN/0rr s,·~TCH
(t-J) At-JTEWU L0O,TIOtJ
rRP lOU\lRS
(N) RA DIO LOCAII0W
FRP PMmSW/ SIUCCO
flNISHTQl.4ATCH
(N) JAJ.IITENAIICE PlAifORl.4
l~ISIOE W/ ACCfSS OPEttNC &
(N) ACCCSS LAOCl(R O(IOW
(tl)n&TD1[5£l
GfHLPA. 10/
(II) A.T&T lf-D' TALL
RLOCt:CREIE WALL
(N) l.41CRQll'AV[ 0ISII
L0C,,TION
STuCCOEtl(RIOR
' '
: :-LlID: '.=: 11, l-J
~ H -----· - ----- ,[!] --------- -1
r-,
r-,
,-,
t-i
,_,
, _J l-J
I I f-·1
,-,
1:1
EAST ELEVATION Jfl&.·•1· o·
~l t
, .. ,
fRP PAt.lHS 'N/ SIUCCO
rll/15H i0 IJ.\TCH
11cv,o01
• b'.g' ~GI
(N) BELL 101'0 10 EE 0ESti;tlED
k. H/Cf.lW!En AY OTHERS
(N) J.T&T 1'11C (WALK-IN CAlllN[T)
(N) AT&T CPS t.lJT[N/1/..
(H) AT&T IC[ GRI0G( W/ (U)
rlfFP TRUHK CM!L[S t, (II)
DC POl,ffi TRUii( CI\BL(S
~~n_ o·•C>' .A, Ci L
rP.P P-1,NCLS w/ srucco
nt,JISH TO MATCH
(N)Alk.117'-0"'Mru:0OlJf>.F
SYrNGSOLIDC~RUGATE0
UETAL ACCESS GI- T~
(N) BELL TOWER TO !JC D[StCtJCO
&HIGINWIED BY0lHlRS
(N) AT&T DIESEL

GENERAHR
(N) 1.1&1 a·-o· l ~LL
!lL0CKCP.[ I[ WAIi
t· o·
' ,-..
~
• '',
' ,
-r~r I
SOUTH ELEVATION 3/16"=1'-0"
~
(1J)R00:-•1t~T
(N)fl.HUJSIOC'N/
TEIIPfRATURE SfNSOR &
1-UlOUAllC OU/Off SWITCH
{H) .I.HTE/Jt/.1. LOCATION
rRP lOUV[RS
(ll)RAOt0L0O,TICN
rRFI Flf,U[LS W/ SlUCC0
flfllSH 10 ~AlCH
(ti) llAlllffllAt/(.£ PIAlfOill,I
IHSIDE "« / ACCESS OPENING &
(tl) ACCESS l~D[)[R BHOW
(N) ~tlCR!lWA'I( DISH
t OCATIOtl
srucco EXT(RICR
(tJ) AT&T ICE BRIDGE V. /( I)
flBfR TRUt,r, C,1,BLES & (t-J)
OC POWER TRUtlt< CABL[S
(N) AT&T 111C (VIAU(-!~ CA.BINET)
(H) AT&T CPS AtlTEHUA
(N) flil[ O[PARUl(tll l(tJOX ox
(N)SITES1GN/..CE
CVL01687

PATTERSON
\025 W LAS PALMAS AVE
PATTERSON, CA 9536J
PREPAfi'EDFO.!
~at&t
Jo,~c.,~:.:.~~-:,,e~:,~~l
(&)
CDfflPLETE
Wlul .... Col!W~f'CI.I.IIC.
·~1AtW. ,r.1. CV\OIW
H OA.e,JOC,,
0~AWN8Y T.STEWART
Cl~.C-ltDI! J G.!AY
~ 'fUI I
11,SW: :JIA1U)
PRELIMINARY:
~IOT FOR

CONSTRUCTION
~EVIN R SO!'IENS~N
S4~69
r:;,,,c,.,o,,o,,,,.ro~•"•'"L•->•• U'll l~•-C••-t •("1~ C.UIOl•I•( ,..-erc<1or,,ci,ao....,11-;::,o.r•1 1.u..-1• ,.,,.,,~,...,,...cuu(•II ~.! ~•I
1 1
r
1 . irir ~ ii - ·• ~ ; ti, l 1 ~g j
.::; ~~ !

SI-IEETTITLE
,1•'1
j,•l!! j
,r', 1!,h ·•li' iMI
11:11
i}Hi
'!!!!
!1·· .,, 11

ELEVATIONS
('"m•A:3.1

8.1.b
Packet Pg. 77
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and CCI 1PA-45R-KU8AA-K
(01
l
J

LEF L VIEW FRONT VIEW
ANTENNA DETAIL CD ,s·.?-o· IAAK Yl{IGH1: 67 6 LBS

ERICSSOO
RRUS-4~ 9 B5/812
1 ''"11 I

SIDE VIEW
C"',J
8 TOP VIEW

FRONT VIEW
RRUS-4449 B5/B12 DETAIL ® l "• I•~• \4AK WEIGHT: 71 LBS CRIC:.SSON AIR 6419
B77C/C - 8,i.ND 5£CTOR ANl[t,,l,IA 1j

TOP VIEW
7 (.1111
J
SI D 1 ____Y'.!.E_JY_ FRONT VIEW
ANTENNA DETAIL CDr=1·-o· l.4AK wrQH ss.4 LBS
= m:sSON
''"'·"""/86'03or view
8IJ8 . 1,011 U .:: _1

SIDE VIEW FRONT VIEW
RRUS-8843 B2 B66 DETAIL
6 1"•1•- o• IAA)( WEIGHT 75 LBS
[RIC5S01~ Al'R 6H9
B77D/C -84HD SECTOR IJ.JTHJNA

TOP VIEW
7 (306")
~J
SIDE _ Vl[W FRON T VIEW
ANTENNA DETAIL Q), .... 1'-fJ' \IAKY,{ICHT: B8 LBS
@ @.C:

TOP VIEW TOP VIEW W/ MOUNT
•
~~::.6().24-BMV
SURGE SUPPR[SSOR --~-
r 1
(J1k4") r =-iot'- l•H1
,,..,, '
J.-(11J"}-

FRONT VIEW FRONT VIEW W/ MOUNT
0~~0~GI:. SUPPRl:.SSO~, Esf =T,~IL~
r-(1'-40")7

ERICSSON
RRus • ..,,,,. OP Vl[W
'(!•"1t
rm r~1, Lill L u

SIDE VIEW FRONT VIEW
RRU S-4478 814 DETAIL ©r .. 1•--0• \IA)( Wt:JGHT: 594 LBS CVL01687

PATTERSON
1025 W tAS PALM AS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
1001&ecuTtwPmtw"'I'
JnnRarrmn.Calf1>1nlaUS8l
·-(&)
COfflPLETE
W-lf•1"AColl•t1~1 jM.

MUUIIHQ 61-:0-IW
PHUfCl 1.i>
011,t,YWH"l' l, l U'WAII
QIC'o.ro .,. I. CRAY11.nllllA,M
PRELIMINARY:

NOT FOR

CONSTRUCTION
KEVINR~ENSEN
S4~69
•111,'Dl,.IOO,Ol'IIW fO • l•N n~.D<
U,~l\lll'll~Al'["CIO.O U1u•1"(
Ga'CC1C...OfAI C l·UD""""•!!.0,,,•1 lNC,tl(lO IO>l!IOIIISD..C~•I•• J
• t
-·,
·""4' ~ .
·a.- ~
-
_,,,,
c:::; I I
Ul(f)i.,
• - u;:l ~}i HJi .. : •'~ "'~• d t l:.1 11 I
m ·1i111
mUi ~!
1 ,ii, "• ! •11 !! 111 iu! ,JU

ANTENNA

DETAILS
['"m"A~4.1

8.1.b
Packet Pg. 78
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and GPSl,NTENNA
0 0
0 UIJSTRUT
rR.w.c .I.S R[O
llUSSllAR
0 0 0
>-----1ro1---~
s~
Sli:HOlD 00\l-ll IR.1
llGlil W/ lt.OltOt/
SWSOR k AUTO
SHuTorr 11~1rn
200>\ JO CIRCUITLOAO
CENTER W/ AUTOM.1.TIC
TR.lNSf[R SWITCH

ACC(SS DOOR

TOP VIEW

C,PS MH(NNA
SHIELDED OOW>J TILT LIG~T
W/ 1,10110N S£NSOR f.•
.t.UTO SHUTCff TIIJ[R

CPS ANTCIINA
200.1.JOCIRCUIT
LOAD CENTER W/ AUTQ~.t,TIC
TIUNSF'ER S"1TCH
""" CENEIUTQf! M(RFACt:
(~·••A·l
LlJ -11,..-l.j

BUSS BAR
>----( .. 01,---..J

FRONT VIEW
JO K ... GEN(RA lOR SDO.lO
0 ~~-S CABIN[T DET~!,~
[
( 6ll'. 1 1 11 , __ ,..)
(Jl,'1

FRONT VIEW
190 CAL UL
142 TANK
(916")--f
11h 1 , ,, , :u7
J
c,,,oi
I l~I --11 ,, --.- 1\ c::J~{J1
' I j [ I
n- >-----1,ou-i

SJDE VIEW
30KW GENERA TOR DETAIL CD 1r.,· ..rr l,jAx ML wrICHr ◄. ss Les TOP
t="'"'.=:1 r .
,~, I m
l. •tt••t••!t••t . • . FRON T
RAYCAP
DCSO-~B-60-96-50,
Eh'Cl.OSUR[
1'(9"l'f'
SIDE
RAYCAP DC50 DETAIL CD k "-1'0~ MAX WEIGHT: 165 LBS
[B3-!' l!il>
,.,._, TOP VIEW
1~••"H
L
HIERSON NUSURE 721
Ot ~~ .lf..»tl 'l,i:,(

FRONT VIEW
(D~{~. DC POWl:.R PLAN I .,,~0,~~
1(168")7
L l I I

TOP VIEW
D m~
FRONT_VIEW RIGt:!l_ VI[_½'
CN 3931 DETAIL © l~..,l'- D" ,•1't 11011 :"1\11~
r 1"'
0 •
1 1
I I I

FRONT VIEW
" (u·,
E.LECIRICIIL PANEL 10 MH.l
COYU[RCIAL PG&'.E REQUIREMENTS
WllHTfSTRYPASS
MILBANK MOOEL fU21dM1BL
:200 AJAP l.£TER/D~OtNECT

OR EOOIVALENT
LJ
SlDE VIEW
~ TER DETAIL
~
l PAC!flC IEClfllCALSOLUllONS PTSJ70H515
(Al>1
J

SIDE VIEW
>-(iU").J,

FRONT VIEW
FIF RACK DETAIL CD Jr•l"-C" YAX \IC!GIIT: 180
INT[RS(CT
PTLC-ATS-JS-12200-CL_ATT
POWER POWER TRANSrER LOAOCABIN[T
1•~•1
CP

TOP VIEW
n r'f GOJ INTERSECT
~ (l;oO"J 0

LEFT VIEW FRONT VIEW RIGHLVIEW
El_ECTRICAL PANEL
CABINET DETAIL ®)(' ~--- o• II.AX 'fltJCi1I. 1)0 LBS
CVL01687

PATTERSON
1025 W lAS PALMAS AVE
PATTERSON, CA 95363
f'5C, Alt(QJQI:
~at&t
,:~g~~~~~~:,t-;~u
COIIPLETE ~ 'Mn,!•1Con1:iddffvi,._,
·,uuwr-.o CV\01 .. I
H O.IC'Clt.O •
Cli! o1.w101, t. tmYA.tll
Qlt-'l«O IL~ J. Ql'A,Y
,1tr,uvu, 1, •
lllU£U'i1\Jl.

PRELIMINARY:
~IOT FOR

CONSTRUCTION
~[VIN R SORENSEN 54~6'1
, ~••n 1•ro-,or,,,. ,o•,,,. .. ~..o-1 .,. ...... . ,.. .. n 1:;nu:. ~11u1a , .. U'IICl,:;,IOJI. ICft<CIOPf0/1~.o,u, ( >£1'.((• IO<llf0l>cDOC UO.llo ~
•
'
.!!,! li~I
~ =
Mrlffl\l.

I~! ~·! •h
!i!
111
l.ii !~i
~~ I JP~
~u~
j!;!I
11n,
hi•;
11,!1
UU'
111!1
P' '!''I
1m1
ill!!

EQUIPMENT

DETAILS
[ '""~A~4.2

8.1.b
Packet Pg. 79
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and CL[CTRICAL l[G[NO
@
®
n
-4-
0 :0:

JL

IAECHANICAL INIERLOCK
IAElER
CIRCUITBR[AKEA
SCR\llC[ GROUND

WIRED CONNECTION
TIIAER SWITCH, WAlERPROOF

OUTDOOR UGI IT

GFI OUTLET, WATERPROOF
(N) JOKW DIESEL GENERATOR
..I
Mfl'iWi'':;DOC'l'OICI
WI, t1''-SSiS ro "=" C,W.O~Bf'ID/1
C
a
,.
,:/
a
(◄) llO, W/110 GND, IN¾" C
(4) f10, W/flO CND, IN¾" C
GFI OUTlET

WATERPROOF
(E)4"CONOUITSTU8,CONN[CT4"CONDUIT INCOl.41NGSER\llCE
~
g
"-
1 <>
& SUPPLY & INSTALL (N) ~- SCH 40 PVC
CONDUITIN59"DEEPTRENCHBETWEEN

TRANSFORIAER PAO & CONDUIT STUB
(N) 200A AT&T METER PANEL W/
DISCONNECT ON (N) Ull1TY
H-rRAL.4[ 111510( AT&T LEASE AR[A
~ ()) J/0, IF. GND, ')" C0NDUIT,APPR0X ,0'
:1 t! " "- :5
ta
e'
~
~
f'ERUlJUTY
IJ&C
1,y
PTLC-ATS-JS-12200-CL_ATT
(◄) f12, W/112 GND. IN 1·c
Ii

SINGLE LINE DIAGRAM
EXT£RIOR
LIGHT
(N) PAD MDUNl[D
lRMJSFDRIAER
(N) 2" SCH 40 PVC CONDUIT W/ 2/0
lRIPI.ElCINBETWEEN(N)TRANSFORIAER
PAD & (N) IAElER PANEL IN (N) J6"
DEEPlRENCH,APPRDX 60'
(N)200AELECIRICALPANEL-'11ACHEO
10 SIDE Of (N) Al&.l 'MC (WALK-IN
CABINET)INSIDE(N)ATrtTLEASEAREA
(N) AT&T CAI.I-LO:< CEN[RIITOR INTCRrACE
(<I-) ilO, W/110 GND, IN¾" C
(4) ,10. W/110 GND, IN¾" C
fliWIJ'l.,\i[ : PIJitl,A
Lo:AbO!rl t OUlff!C
LIOUUM · 1H
.. .. LOAD VA LOAD VA
mo u.-,, tl20
IJ,O
1320
lJl'/1
""' mo 1!10

1.!-JG
UJO IJ20
'"" Tlillll ,,.
9700 9520
'.!Of"'-'t" • .,..,,
(N) 200A AT&T
METER W/ DISCONfl[Cl
tQPU'~.ACl
(N)UNISIRUT,JVP
:J
~ RAME ELEVATION

PANEL SCHEDULE
Sl:U'dl. 1 11,VOO 'la~'1Vt' 'l'IIV.lJ
eJSJ.~J(IOA
BKR "'"'""-
'" .. LOAfl DESCRIPTION /MP/ CIRCUITt,10 IYP/ LOAD DESCRIPTION " LOAD VA LOAD VA POLE POLE m1n.• 1 -= I , ---..,, .IJCTJU ,1 'Ji'O
- 1 ' . l.!lO ll!mu: YJn • • ,on lttlfO. U>ll . I ' . .,,. 1r,1ttt J ,. , ' .. ,.,, RI.C':.-0' TJNl . " " - 1.UO
in:arm1 ,.,, " ,, jffl ll[t;ll'(R 10 UlO . ,. .. - ,,,.. fr(,TRR I 70/l " .. >171 IUt1fD If UlO . " "' - ,,,. Jl!C!tMUI "1n ,, n "'" RtCTll'O 11. IJ,O . lJ ,. . ,,,. tNAC I ,~ ,. ,. :.0/1 EllrJ.:IIM. utK'T/Wi'I.D ICP1 .,., - " " ,.,, &lltOO aC<II RECEPTACLE 20/1 29 JO 20/1 BATTERY HE1iTER BLOCK 250 '""' PHASE TOTALS PHASE TOTALS B470 7920 'ID'IU .IJIIPS , ..
• ...... ,fw
CVL01687

PATTERSON
102$ \V W PAlMAI AVE
PA!l~ON,CA•).)1.3

PREPARED FOR
eat&t
SOOIEJacullVl!~arlway
5anRam:1r1,CaTla1n1a,Hel
·-
COfllPLETE ~ Wff.,_,Cot-111J11,rn0,. lr,,a,.
1,IUUlllilO C.\'t.OtW
N'Oll'Cl>.o
Cl:&wt,j~T LUtwJiar
CHll!flD I.Y J l;.l!lif
..,.f't:DW01l •
Ci\\lESfAiM

PRELIMINARY

NOT FOR

CONSTRUCTION
K[VIN R. SORENSEN
5~~69
111,,-0,.iONor,.,, roo~,,, P1.r-..o,,.
uruss11,1•>01•c1~,:;.,.,Dl•11,c
C:..A:IONC)r~(C!•"H) POOl(='L
CNG~rH I 10•,11•oe1DU::LWErJI
•
~i·1 .~
. 1.: ~
·: ~ i· =
~~! 5•! d.
a;;; :i
~Ji
liJ
lJ<
••I .,.
~i]
:8; i •
U;~I ,,ii,
•jhl
~!H;
11111
111''1 I,!!
um
!l!ll
,nu

ELECTRICAL PLAN
E-1.1

8.1.b
Packet Pg. 80
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and AT&T Wireless
,l\ d v a ,1: c ~ S ,i ,m=z-7 ) 1.ont,H"1ttJl•1i •
1r1.•;Vil1,
CVLO 1687 Patterson
1025 W. Las Pa/mas Avenue, Patterson, CA
Photosims Produced on 12-14-2022
Shot Point Map

8.1.b
Packet Pg. 81
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and ·~ · AT&T Wireless CVL0/687 Parrerson
I 025 W. Las Patmos Ave,we, Parcerson, CA
Photosims Produced on 12-14-2022

8.1.b
Packet Pg. 82
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Existing
Proposed
"='
ATa.T Wireless CVLO 1687 Pallerson
1025 W. Los Pa/mas Avenue, Parcerson, CA
PhotosfnH Produced on 1 i-1.1-2022

8.1.b
Packet Pg. 83
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Existing
1-D ' l-oposea
O ,1
Proposed AT&T
Installation
ATr.T Wireless CVLO 1687 Parterson
1025 W. las Pa/mas Avenue, Pcmerson, CA
Photos rms Proclu ce cl on 12- 14-2022

8.1.b
Packet Pg. 84
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Proposed
ATCaT Wireless CVLO i 687 Patterson
7 025 W. Los Pa/mas Avenue. Patrerson, CA
Photosirn s P1 oducecl on 12-14-2022

8.1.b
Packet Pg. 85
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.)

ITY OF PATTERSON

COMMUNITY DEVELOPMENT DEPARTMENT
PO BOX667, PATTERSON, CALIFORNIA 95363
(209) 895-8020, FAX (209) 895-8019

PROPOSED

NEGATIVE DECLARATION
A notice, pursuant to the California Environmental Quality Act of 1970, as amended (Public Resources Code 21,000, et. seq.) that the project for AT&T Wireless Tower - Community Center which, when implemented, will not have a significant impact on the environment.

PROJECT TITLE: AT&T Wireless Tower - Community Center
PROJECT LOCATION: APN 021-070-002, North side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive, City of Patterson, County of Stanislaus DESCRIPTION OF PROJECT: The construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the Public/Quasi-Public zone.

FINDINGS AND BASIS FOR A NEGATIVE DECLARATION:

1. The project will not adversely affect water or air quality or increase noise levels;

2. The project will not have adverse impacts on the flora and fauna of the area;

3. The project will not degrade the aesthetic quality of the area;

4. The project will not have adverse impacts on traffic or land use;

5. In addition, the project will not:
a. Create impacts which have the potential to degrade the quality of the environment; b. Create impacts which achieve short-term to the disadvantage of long term environmental goals; c. Create impacts for a project which are individually limited, but cumulatively considerable; d. Create environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly;
The City of Patterson has, therefore, determined that the potential environmental impact of the project is insignificant.

MITIGATION MEASURES INCLUDED IN THE PROJECT. IF ANY, TO AVOID POTENTIALLY SIGNIFICANT EFFECTS: NIA
INITIAL STUDY: The City of Patterson Community Development Depa1tment has reviewed the potential environmental impacts of this project and has found that the probable impacts are potentially insignificant. A copy of the Initial Study is attached.

REVIEW PERIOD: June 29, 2023 through July 31, 2023
All comments regarding correctness, completeness, or adequacy of this Negative Declaration must be received by the City of Patterson Community Development Department, PO Box 667, Patterson, CA DATE:
95363 or
June
at (209)
29, 2023
895-8020, no later
SIGNATURE:
than 5:00 p.rn. on July
~~
31,202
--- ~
_ . ~
Joel Andrews, City Planner
Phone: (209) 895-8020 Email:[email protected]

8.1.b
Packet Pg. 86
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.)

CITY OF PATTERSON
Initial Study of Environmental Impact
I. Summary of Findings
Project Name: AT&T Wireless Tower - Community Center - Project Description: The project assessed by this initial study considers the construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, a 8' x 8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the Public/Quasi:-Public Zone.

Sources: This initial study was prepared using the Patterson Zoning Ordinance, 2010 General Plan, 2010 General Plan EIR, and the City's guidelines for the implementation of CEQA.

Applicant: City of Patterson, 1 Plaza, PO Box 667, Patterson, CA 95363 Recommendation: Negative Declaration
Location: North side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive, 1025 West Las Palmas Avenue, Patterson, CA 95363 - Assessor Parcel Numbers 021-070-002
Date: June 29, 2023
II. Project Description
The project assessed by this initial study considers the construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8' precast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in Public/Quasi-Public Zone, on a site approved for community center facilities.

Environmental Setting
The project site is generally vacant and is part of an undeveloped section of the Community Center project, a City of Patterson project that includes existing facilities such as the Aquatics Center, Hammon Senior Center, skate park, and Recreation Deparbnent offices. The master plan for this area includes additional community center space and an expansion of the aquatics center. Development bordering the site includes Tilton Park and the Las Palrnas Senior Apartments complex to the west, single family housing to the north, vacant land zoned for commercial development to the east, and the True Value shopp~g center to the south. See Figure 1. No off-site work is planned. See,Figure 2.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 1

8.1.b
Packet Pg. 87
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Figure 1- Project Location
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 2

8.1.b
Packet Pg. 88
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Figure 2 - Project Site
(£) 8"U>NG •-.,.

APN:
021-070-001
I
I
I
I
g/
t;-1
l!
I
I
(E) CONCRElr SOE\IIALX "' •
I
(N) AT&T s·-O·0·-o· U/G VAULT W/ TR.-FAC
RATI!J Lil FOft f'l3m "MEET Jilt :IQINT a: (N)
AT&T ABER POC ·
SHEARWA !ER DRIVE
APN:
021-070-002

SEE EQUIPMENT PLAN,
SHEET A-1 2
.,. --- (P} lil6:1 Ntl.'f-'Dt\USVC . l£0"'1CI.ON p- SP4C£ OVERALL Sl"E PLAN
i ·r
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 3 T

8.1.b
Packet Pg. 89
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Figure 3- Enlarged Project Area
Oil ua:, em rCIER 'ff/ [NJ ATli:i .lH!0'11AS.t:AHIDlll•ECIJPuOITNSI)[, S'EE .oNmflA PUH, g.m ,.,_2.1- '".., (N)ffDQ('ff/'llaO~
MlllJGHCtlt~IJIEA ••
(N)AI.I IW11.MI
(N)ID'•lft5·-o· CIJIGElrlDIOIAfll!ISUB- -,
(NJ u.,,, JO"-o•x:;o•-o· (soason)LWE"-"EA • •
,1- 1,
' I
'
!
I
EOUIPl,F IT PLt.N J(, ... ,;"
' l • c
-•- (N)HW,CI.IITJ>RIMlED
W/IICf'AIJJ(- UICAata)
--- -~~~~ wnt«ti,u"-HW:!19),m>OICZJ ~~
-- (N)U&TG5$N,'19f,11,
··· -11,v.a.1:1-'J'~
- ... . · (•! "'" t'V,/QQOl#f0/1. ~~i~;:; \~ •• -IN)Ul'CITYH~W/\H)AlkT ~ l,HR J>All!l. W/t1500t<il:tt
"' Ct400U."/WDIIOIBO.OI!
• - l!l)F'RtOUM!llEJll
"""'" f"J AT,tl 11' t" ~ l!OUIU
S°iUICS(U)comllJCUtllUIT41,
o\Ct1'!SGA1':•/SITr~GII~
!N}.Ut:IYU/(; Q:)'11111 1011
PJ'll[Jlnt(W,OC:fO (H)lroA61P
Kr'-' ' NEJ.. >.PP'-00 ~!ti'
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 4

8.1.b
Packet Pg. 90
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Ill. Initial Study Environmental Checklist
This section discusses potential environmental impacts associated with approval of the proposed project.

The following guidance, adapted from Appendix I of the State CEQA Guidelines, was followed in answering the checklist questions:

1. A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the discussion. A "No Impact" answer is adequately supported if the discussion shows that the impact simply does not apply to projects like the one involved ( e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained when it is based on project-specific factors as well as general standards ( e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).

2. All answers must take account of the whole action involved, including offsite as well as onsite, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.

3. All analyses must be based on a comparison between conditions that would occur if the project were implemented and existing conditions (also known as baseline conditions).

4. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required.

5. "Potentially Significant unless Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less-Than-Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less-than-significant level (mitigation measures from earlier analyses may be cross-referenced).

6. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration (State CEQA Guidelines Section 15063[c][D]). Earlier analyses are discussed in the project description above under "Previous Environmental Documents and Site-Specific Information".

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 5

8.1.b
Packet Pg. 91
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) The discussion that follows each section of checklist questions:
• analyzes previously certified environmental analysis and/or mitigation relevant to the issue, including the potential for each effect to be significant and adverse and standard requirements and measures that will preclude adverse impacts; • describes proposed measures that will preclude adverse impacts; • analyzes the potential for residual or remaining significant adverse impacts following implementation of the project and all previously identified, standard, and proposed requirements and measures; and
• summarizes the applicable. mitigation measures established by the various support documents and project-specific measures that will reduce the impacts to a less-thansignificant level.

Identification of the potential for residual significant adverse environmental impacts would trigger the need for preparation of an EIR. For issue areas in which no significant adverse impact would result or impacts would be reduced to a less-than-significant level by mitigation, further analysis is not required.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 6

8.1.b
Packet Pg. 92
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) I. LAND USE AND PLANNING
Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Issues Incorporated
Would the proposal:
a. Conflict with general plan designation or zoning? ■
b. Conflict with applicable environmental plans or ■
policies adopted by agencies with jurisdiction over
he project?
C. Be incompatible with existing land use in the ■
!Vicinity?
d. Affect agricultural resources or operations (e.g., ■ impacts on soils or farmlands, or impacts from
incompatible land uses)?
e. Disrupt or divide the physical arrangement of an ■
established community (including a low-income or
!minority community)?
Setting/
The project consists of a wireless communication facility consisting of an 84.9' tower and associated equipment within the Public/Quasi-Public General Plan District and the Public/Quasi-Public Zone.

Discussion
a,c. "Public Utility Structures" are permitted with a conditional use permit in the Public/Quasi-Public Zone. The municipal code allows a maximum height of 60' for communication equipment in the Public/Quasi-Public zone. However, the Planning Commission may approve an exception where additional height above the maximum may be approved, provided that the applicant submits information demonstrating that the increased height is necessary for a more efficient development and coverage pattern. In this instance, the applicant is requesting an exception to allow the additional 24.9' in height with information showing that the increased height adequately serves coverage gaps in cell service in and around the City of Patterson. The code also includes provisions related to minimum distances for towers from residences and residential zones. The project is located at least 180 feet from the nearest existing residence, sufficiently distant to meet required "fall distance" criteria.

The project has been designed with the look of a decorative bell tower with mission revival-style architectural elements, both to screen the cell tower use and to blend in with the surrounding development contemplated as part of the Community Center project.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 7

8.1.b
Packet Pg. 93
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Conclusion
The proposed project is not anticipated to significantly impact agricultural land or land use compatibility.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 8

8.1.b
Packet Pg. 94
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) II. POPULATION AND HOUSING
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Cumulatively exceed official regional or local •
population projections?
b. Induce substantial growth in an area either •
directly or indirectly (e.g., through projects in an
undeveloped area or extension of major
infrastructure)?
C. Displace existing housing, especially affordable ■
housing?
Setting/Discussion
The project consists of wireless communication equipment in an undeveloped area. No impact to population or housing is anticipated.

Conclusion
The project will not have an impact on housing or population.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 9

8.1.b
Packet Pg. 95
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) III. GEOLOGIC HAZARDS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Woula the proposal result in or expose people to potential impacts involvin5!:
a. Fault rupture? ■
~- Seismic j1,"rOund shaking? ■
C. Seismic ground failure, including liquefaction? ■
d . Seiche, tsunami, or volcanic hazard? ■
e. Landslides or mudflows? ■
f. Erosion, changes in topography or unstable soil ■
conditions from excavation, grading, or fill?
g. Subsidence of the land? ■
h. Expansive soils? ■
i. Unique geologic or physical features? ■
Setting
The area is within a zone of low seismic activity. All impacts have been addressed in the General Plan EIR. No significant soils effects or geological problems are expected, which cannot be addressed through the use of current engineering standards adopted by the City and State.

Discussion
f.,h. Grading and excavation required to implement install equipment related to the project create the possibility of unstable soil conditions. However, no significant soils effects or geological problems are expected, which can not be addressed through the use of current engineering standards adopted by the City and State.

Conclusion
The project will not result in impacts relating to geologic hazards considered to be significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 10

8.1.b
Packet Pg. 96
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) IV. DRAINAGE AND WATER SUPPLY
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
a. Changes in absorption rates, drainage patterns, or ■ he rate and amount of surface runoff?
b. Exposure of people or property to water-related ■
nazards such as flooding?
C. Discharge into surface waters or other alteration of ■ 15urface water quality (e.g., temperature, dissolved
oxygen or turbidity)?
d. Changes in the amount of surface water in any water ■ body?
e. Changes in currents, or the course or direction of ■ twater movements?
f. Change in the quantity of ground waters, either ■
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
hrough substantial loss of groundwater recharge
capability?
g. Alteration to the direction or rate of flow of ■
groundwater?
h. Impacts on groundwater quality? ■
i. Substantial reduction in the amount of groundwater ■ otherwise available for public water supplies?
Setting/ Discussion
Construction of the project would not have an effect on procurement, distribution or quality of drinking water.

Conclusion
The project is not expected to result in significant impacts relating to drainage and water quality or quantity.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 11

8.1.b
Packet Pg. 97
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) V. AIR QUALITY
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
lncorporated
Would the proposal:
a. Violate any air quality standard or contribute to an ■ existing or projected air quality violation?
b. Expose sensitive receptors to pollutants? ■
.... Alter air movement, moisture, or temperature, or • K:ause any change in climate?
kl. Create objectionable odors? ■
Setting
Currently, the San Joaquin Valley Air Basin is classified as a "Severe non-attainment" area for both the federal and State standards for ozone and a "serious" non-attainment area for the federal standard for respirable particulate matter (PM10, or particles 10 microns or smaller in diameter). Emissions of these air pollutants, and their precursors, will increase as a result of motor vehicle trips generated by the project, and from grading and construction operations. Together, these activities may hinder efforts to achieve and maintain air quality standards established by federal and State laws.

Discussion
a. Development of the project site will result in short-term air pollutant emissions and dust generation from construction activities. Such activities will generate short-term fugitive dust and vehicle exhaust emissions as a result of excavation, grading, and constructionrelated vehicle trips.

Construction Emissions
A project's construction phase produces many types of emissions, but PM-10 is the pollutant of greatest concern. PM-10 emissions can result from a variety of construction activities, including excavation, grading, demolition, vehicle travel on paved and unpaved surfaces, and vehicle exhaust. Construction-related emissions can cause substantial increases in localized concentrations of PM-10, as well as affecting PM-10 compliance with ambient air quality standards on a regional basis. Particulate emissions from construction activities can lead to adverse health effects as well as nuisance concerns such as reduced visibility and soiling of exposed surfaces.

The SJVUAPCD's approach to CEQA analyses of construction impacts is to require implementation of effective and comprehensive control measures rather than to require CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 12

8.1.b
Packet Pg. 98
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) detailed quantification of emissions. PM-10 emitted during construction can vary greatly depending on the level of activity, the specific operations taking place, the equipment being operated, local soils, weather conditions, and other factors, making quantification difficult. Despite this variability in emissions, experience has shown that there are a number of feasible control measures that can be reasonably implemented to significantly reduce PM-10 emissions from construction. The SJVUAPCD has determined that compliance with Regulation VIII for all sites and implementation of all other control measures as appropriate, depending on the size and location of the project site will constitute sufficient mitigation to reduce PM-10 impacts to a level considered less-thansignificant.

San Joaquin Valley Unified Air Pollution Control District air quality mitigation measures are already included as mitigations for all projects as standard procedure to address these issues. Additionally, appropriate policies are dealt with in the 2010 General Plan EIR:

The City shall require all of the following as a condition of project approval of future development projects:
• All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover.
• All on,site unpaved roads and 0££,site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant. • All land clearing, grubbing, scraping, excavation, land leveling, grading, cut &: fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking.
• With the demolition of buildings up to six stories in height, all exterior surfaces of the building shall be wet during demolition.
• When materials are transported of£,site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the top of the container shall be maintained.
• All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions.) (Use of blower devices is expressly forbidden.) • Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizer/suppressant. • Within urban areas, track,out ( earth material deposited on City streets by construction equipment) shall be immediately removed when it extends 50 or more feet from the site and at the end of each workday.
• Any site with 150 or more vehicle trips per day shall prevent carryout and track,out. • Limit traffic speeds on unpaved roads to 15 mph;
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 13

8.1.b
Packet Pg. 99
Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) • Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent. • Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site;
• Install wind breaks at windward side( s) of construction areas; • Suspend excavation and grading activity when winds exceed 20 mph; and limit area subject to excavation, grading, and other construction activity at any one time. Regardless of wind speed, an owner/operator must comply with Regulation VIII's 20 percent opacity limitation.
a. Impacts associated with the project are related to construction activities. temporary and have been addressed through the listed measures. significant impact is anticipated.

Conclusion
The project will not result in significant impacts to air quality.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 14 Such impacts are
As a result, no

8.1.b
Packet Pg. 100 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) VI. TRANSPORTATION/CIRCULATION
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
~- Increased vehicle trips or traffic congestion? ■
b. Hazards to safety from design features ( e.g., ■
sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
Inadequate emergency access or access to nearby ■
tuses?
kl. Insufficient parking capacity onsite or offsite? ■
~- Hazards or barriers for pedestrians or bicyclists? ■ f. Conflicts with adopted policies supporting ■
alternative transportation (e.g., bus turnouts, bicycle racks)?
g. Rail, waterborne, or air traffic impacts? ■
Discussion
a. Construction of the project would incrementally add vehicle trips that are necessary to transport construction equipment, materials and personnel to the project site while the project is built.

Such impacts are not considered significant.

Conclusion
The project will not result in significant impacts to transportation or circulation systems.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 15

8.1.b
Packet Pg. 101 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) VII. BIOLOGICAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in impacts on:
a. Endangered, threatened or rare species or their ■
habitats (including, but not limited to, plants, fish,
!insects, animals, and birds)?
!b. Locally designated species (e.g., heritage ■
trees)?
C. Locally designated natural communities (e.g., ■
oak forest)?
d. Wetland habitat (e.g., marsh, riparian, and ■
vernal pool)?
e. Wildlife dispersal or migration corridors? ■
Setting/Discussion
Endangered, threatened, or rare species in the Patterson area include the San Joaquin Kit Fox (Vulpes macrotis mutica), Swainson's Hawk (Buteo swainsoni), Western Pond Turtle (Clemmys marmorata), and Burrowing Owl (Athene cunicularia). The San Joaquin Kit Fox's preferred habitat is grassland and rolling hills. Swainson's Hawk and Burrowing Owl both prefer grasslands.

The project is located on vacant land, previously used for agricultural purposes in an otherwise urbanized area. Potential impacts associated with biological resources were addressed in the 2010 General Plan EIR.

Conclusion
The project will not result in significant impacts to biological resources.

CITY OF PATTERSON1 INITIAL STUDY OF ENVIRONMENTAL IMPACT 16

8.1.b
Packet Pg. 102 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) VIII. ENERGY AND MINERAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
a. Conflict with adopted energy conservation ■
plans?
b. Use nonrenewable resources in a wasteful and ■
inefficient manner?
... "' Result in the loss of availability of a known ■
mineral resource that would be of future value to
the region and the residents of the state?
Discussion
The project will result in an incremental increase to the use of non-renewable energy sources.

Conclusion
The project would not result in a significant increase in the use of energy or mineral resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 17

8.1.b
Packet Pg. 103 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) IX. HAZARDS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the propos(I/ involve:
~- A risk of accidental explosion or release of •
!hazardous substances (including, but not limited
•o, oil, pesticides, chemicals, or radiation)?
b. Possible interference with an emergency •
response plan or emergency evacuation plan?
The creation of any health hazard or potential •
!health hazard?
d. Exposure of people to existing sources of •
potential health hazards?
e. Increased fire hazard in areas with flammable •
brush, grass, or trees?
Discussion
A Radio Frequency Electromagnetic Energy Compliance Report was prepared for the proposed project. The study determines potential exposure levels for the facility and compares that information to the Federal Communications Commission's Maximum Permissible Exposure Limits for both members of the public and those accessing the site for work related duties. The study determined that, under a worst case scenario, there is no modeled exposure for either occupational or the general public uses under FCC's limits.

The project is not expected to create or increase hazards.

Conclusion
The project will have a less than significant impact on health and safety.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 18

8.1.b
Packet Pg. 104 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) X. NOISE
Issues Potentially Potentially Less- No
Significant Significant Than- Impact
Impact unless Significan
Mitigation timpact
Incorporated
Would the proposal result in:
a. Increases in existing noise levels? ■
b. Exposure of people to severe noise levels? ■
Setting
The Noise Element of the General Plan provides goals, policies, and implementation measures intended to reduce the adverse effects of noise. The Noise Element sets standards for the maximum allowable noise exposure from transportation sources as summarized on Table HS-3, below.

Outdoor Activity Areas1 Interior Spaces
Land Use Ldn/CNEL, Dbldn/CNEL, dbleq, Db2
Residential 603 45
Transient Lodging 603 45
Hospitals, Nursing Homes 603 45
Theaters, Auditoriums, Music Halls 35
Churches, Meeting Halls 603 40
Office Buildings 603 45
Schools, Libraries, Museums 45
Playgrounds, Neighborhood Parks 70

1. vVhere the location of outdoor activity areas is unknown, the exterior noise level standard shall be applied to the property line of the receiving land use.

1. As determined for a typical worst-case hour during periods of use.

2. Where it is not possible to reduce noise in outdoor activity areas to 60 Db Ldn/CNEL or less using a practical application of the best available noise reduction measures, an exterior noise level of up to 65 Db Ldn/CNEL may be allowed, provided that available exterior noise level reduction measures have been implemented and interior noise levels are in compliance with this table.

Noise is typically expressed in decibels (dB). U,.e decibel scale is logarithmic because of the physical characteristics associated with noise transmission and reception. For example, a

3.0 decibel ( dB) increase in noise levels normally results in a doubling of noise energy; however, because of the structure of the human auditory system, a 10-decibel increase is required to perceive a doubling of noise. A l- to 2-decibel change in ambient noise levels is CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 19

8.1.b
Packet Pg. 105 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) generally not perceptible to the human ear. The A-weighted decibel (dBA) incorporates the human ear's sensitivity to sounds of different frequencies. On this scale, the sound level of normal talking is about 60 to 65 dBA.

Noise levels diminish (or attenuate) as distance from the source increases based on an inverse square rule, but the rate constant varies with the type of sound source. Sound from point sources, such as industrial facilities, attenuates at a rate of 6 dBA per doubling of distance. Heavily-traveled roads with few gaps in traffic behave as continuous line sources with an attenuation rate of 3 dBA per doubling of distance. Otherwise, roads typically have an attenuation rate of 4.5 dBA.

Construction work is the main source of noise as a result of the project.

A noise study was prepared for the project which reviewed predicted noise levels associated with the operation of the facility. The study determined that the project's noise exposure would be less than the City's required noise generation maximum requirements.

No ongoing significant noise impacts are expected as a result of this project.

Discussion
a., b. Noise levels on the project site will increase as a result of construction activities associated with the project. Such noise is temporary and is not considered significant.

Noise from the generator is not expected to exceed noise standards outlined in the 2010 General Plan EIR. No significant ongoing impacts are anticipated.

Conclusion
Noise levels resulting from construction and operation of the project have been addressed and can be mitigated per the 2010 General Plan EIR.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 20

8.1.b
Packet Pg. 106 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XI. PUBLIC SERVICES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal have an effect upon, or result in a
need for new or altered government services in any of the "ollowin!i; areas:
a. Fire protection? ■
~- Police protection? ■
c. Schools? ■
d. Maintenance of public facilities, including roads? ■ e. Other governmental services? ■
Setting/Discussion
The project is not expected to affect the need for services. The project would result in increased wireless communication coverage to the westside of the City of Patterson.

Conclusion
The project will not result in a significant impact on the need for and maintenance of public services.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 21

8.1.b
Packet Pg. 107 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XII. UTILITIES AND SERVICE SYSTEMS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in a need for new systems or
r,supplies, or substantial alterations to the following utilities:
~- Power or natural gas? ■
b. Communications systems? ■
c. Local or regional water treatment or distribution ■
facilities?
d. Sewer or septic tanks? ■
e. Stormwater drainage? ■
£. Solid waste disposal? ■
g. Local or regional water supplies? ■
Setting/Discussion
The project would increase the availability of signals for wireless networking, which is the purpose of the project. No other new utilities or service systems are anticipated as related to this project.

Conclusion
The project will not result in a significant impact to utility or service systems.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 22

8.1.b
Packet Pg. 108 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XIII. AESTHETICS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Affect a scenic vista or scenic highway? ■
p. Have a demonstrable negative aesthetic effect? • C. Create light or glare? ■ Setting/Discussion
b. The project would be disguised as a decorative bell tower, designed to complement surrounding proposed development in the Community Center area, so as not to appear as telecommunication equipment. Further, the project site will be surrounded by a solid wall.

The limited scale and massing of the cell tower facility renders negative aesthetic effects as less than significant.

Conclusion
The project will not have a significant adverse effect on the aesthetic quality of the City.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 23

8.1.b
Packet Pg. 109 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XIV. CULTURAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Disturb paleontological resources? •
I:>. Disturb archaeological resources? • C. Affect historical resources? • d. Have the potential to cause a physical change •
which would affect unique ethnic cultural values?
~- Restrict existing religious or sacred uses within •
~he potential impact area?
Setting
A review of relevant archaeological literature found no evidence of prehistoric, historic or archeological sites within the project vicinity according to the archival record. The construction project is subject to mitigation measures from the 2010 General Plan EIR. If cultural resources are unearthed during excavation or construction, the project will be halted and appropriate agencies will be contacted for further site assessment.

Conclusion
Development of the project site will have no effect on archaeological, historic or paleontological resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 24

8.1.b
Packet Pg. 110 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XV. RECREATION
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Increase the demand for neighborhood or ■
regional parks or other recreational facilities?
b. Affect existing recreational opportunities? ■
Setting/Discussion
The project will not result in a significant impact to recreational resources. The project would be located in a regional park/community center area and has been designed to fit within the overall concept and placed in an unobtrusive location.

Conclusion
Project related impacts to recreation facilities and opportunities are considered less than significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 25

8.1.b
Packet Pg. 111 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XVI. GREENHOUSE GAS EMISSIONS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Generate greenhouse gas emissions, either •
directly or indirectly, that may have a significant
impact on the environment?
b. Conflict with an applicable plan, policy or •
regulation adopted for the purpose of reducing the
emissions of greenhouse gases?
Setting/Discussion
a-b) The proposed project was analyzed for potential greenhouse gas emissions impacts within the City of Patterson General Plan EIR, that provided several mitigation measures, to which the project would be subject. The project represents a incremental and limited use, when compared with the baseline land use assumptions as analyzed in the General Plan EIR, therefore, greenhouse gas emissions impacts would be less than significant.

Additionally, the proposed project would not conflict with an applicable plan, policy, or regulation intended to reduce the emissions of greenhouse gases.

Conclusion
Project related impacts related to greenhouse gas emissions are considered less than significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 26

8.1.b
Packet Pg. 112 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XVII. MANDATORY FINDINGS OF SIGNIFICANCE
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
~- Does the project have the potential to degrade the ■ quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten o eliminate a plant or animal community, reduce the
tnumber or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory?
p. Does the project have the potential to achieve short- ■ term, to the disadvantage of long-term, environmental
goals?
C. Does the project have impacts that are individually ■ limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a
project are considerable when viewed in connection with he effects of past projects, the effects of other current [projects, and the effects of probable future projects.) d. Does the project have environmental effects that will ■ cause substantial adverse effects on human beings, either directly or indirectly?
Discussion of Checklist Answers
The project is not expected to result in significant adverse impacts on the environment.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 27

8.1.b
Packet Pg. 113 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) XVII. Determination
In accordance with Sections 15152 and 15168 of the State CEQA Guidelines, this initial study has been prepared to evaluate the potential impacts of the proposed project.

On the basis of this initial evaluation:

I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. _K__ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described in the initial study. A NEGATIVE DECLARATION will be prepared.

I find that the project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMP ACT REPORT is required.

I find that the proposed project MAY have a significant effect(s) on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, if the effect is a "potentially significant impact" or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project.
au~ {,L j, ]J
/ Joel Andrews Date
City Planner
City of Patterson
(209) 895-8024
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 28

8.1.b
Packet Pg. 114 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Environmental Noise Assessment
CVL01687 AT&T Cellular Facility
Patterson, California
BAC Job# 2022-172
Prepared For:

Complete Wireless Consulting
Attn: Steve Proo
2009 V Street
Sacramento, CA 95818
Prepared By:

Bollard Acoustical Consultants, Inc.

Dario Gotchet, Principal Consultant
December 19, 2022

BOLLARD
Acoustical Consultants
Bollard Acoustical Consultants, Inc. • P.O. Box 7968, Auburn, CA. 95604 • Phone: (530) 537-2328 • bacnoise.com

8.1.b
Packet Pg. 115 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Bollard Acoustical Consultants, Inc.

Introduction
The CVL01687 AT&T Wireless Unmanned Telecommunications Facility Project (project) proposes the installation of cellular equipment within a lease area located at 1025 W Las Palmas Avenue in Patterson, California (APN: 021-070-002). The externally mounted HVAC unit of a premanufactured walk-in cabinet (WIC) and an emergency diesel standby generator have been identified as the primary noise sources associated with the project. The project site location with aerial imagery shown in Figure 1. The studied site drawings are dated December 1, 2022.

Bollard Acoustical Consultants, Inc. (BAC) has been contracted by Complete Wireless Consulting, Inc. to complete an environmental noise assessment regarding the proposed project cellular equipment operations. Specifically, the following assessment addresses daily noise production and exposure associated with operation of the project emergency generator and HVAC equipment.

Please refer to Appendix A for definitions of acoustical terminology used in this report. Appendix B illustrates common noise levels associated with various sources.

Criteria for Acceptable Noise Exposure
City of Patterson General Plan
The Health and Safety Element of the City of Patterson General Plan establishes performance standards for non-transportation (stationary) noise sources, such as those proposed by the project. The non-transportation noise level limits contained in the General Plan have been reproduced and are provided below in Table 1.

Table 1
Noise Level Performance Standards for New Projects Affected by or Including Non-Transportation Noise Sources1
Daytime Nighttime
Noise Level Descriptor (7:00 a.m. to 10:00 p.m.) (10:00 p.m. to 7:00 a.m.) Hourly Leq, dB 50 45
Maximum Level (Lmax), dB 70 65
1 Each of the noise level standards specified in Table 1 shall be reduced by five (5) dBA for pure tone noises, noise consisting primarily of speech or music, or for recurring impulsive noises. These noise level standards do not apply to residential units established in conjunction with industrial or commercial uses (e.g., caretaker units).

These standards are to be assessed at the property line of lands designated for noise-sensitive uses.

Source: City of Patterson General Plan, Health and Safety Element, Table HS-1 Project Noise Generation
As discussed previously, there are two project noise sources which are considered in this evaluation: the externally mounted HVAC unit of the pre-manufactured WIC and the emergency diesel generator. The evaluation of potential noise impacts associated with the operation of each noise source is evaluated separately as follows:

Environmental Noise Assessment
CVLOt 687 AT&T Cellular Facility- Patterson, California

Page 1 ends

8.1.b
Packet Pg. 116 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Legend
D Proposed AT&T Cellular Equipment Lease Area
Parcel Boundaries (Approximate)
0 N
1'
Scale (Feet)
75 150
CVL01687 AT&T Cellular Facility
Patterson, California
Proposed Cellular Facility Lease Area
& Nearest Noise-Sensitive Use
Figure 1 tjB))
B~~4

8.1.b
Packet Pg. 117 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and Bollard Acoustical Consultants, Inc.

HVAC Equipment Noise Source and Reference Noise Level
The project proposes the installation of a pre-manufactured WIG equipped with one (1) externally mounted HVAC unit within the equipment lease area illustrated on Figure 1. According to the project site plan, the HVAC unit assumed for the project is a Marvair Airxcel, Inc. Model ECUA 18ACA. Based on reference noise level data obtained from the manufacturer (Marvair Airxcel, Inc.), this specific HVAC unit model has a reference noise level of 62 dB at a distance of 5 feet. The manufacturer's noise level data specification sheet for the proposed HVAC equipment is provided as Appendix C.

Generator Noise Source and Reference Noise Level
The project also proposes the installation of an emergency standby diesel generator within the lease area to maintain cellular service during emergency power outages. Specifically, the project proposes the installation of a Generac Industrial Power Systems Model SD030 equipped with a Level 2 Acoustic Enclosure. According to manufacturer documentation (provided as Appendix D), the SD030 with a Level 2 Acoustic Enclosure has a reference noise level of 68 dB at a distance of 23 feet.

The generator which is proposed at this site would only operate during emergencies (power outages) and brief daytime periods for periodic maintenance/lubrication. According to the project applicant, testing of the generator would occur twice per month, during daytime hours, for a duration of approximately 15 minutes. The emergency generator would not operate at night, except during power outages. It is expected that nighttime operation of the project emergency generator would be exempt from the city's exterior noise exposure criteria due to the need for continuous cellular service provided by the project equipment.

Predicted Facility Noise Levels at the Nearest Noise-Sensitive Use The nearest noise-sensitive uses have been identified as residential located west of the project parcel. Assuming standard spherical spreading loss (-6 dB per doubling of distance), project equipment noise exposure at the property line of the nearest residential use was calculated and the results of those calculations are presented in Table 2. Satisfaction of the city's noise criteria at the nearest noise-sensitive use would ensure for satisfaction of the criteria at noise-sensitive uses located farther away.

Table 2
Summary of Project-Related Noise Exposure at the Nearest Noise-Sensitive Use Distance from Predicted Equipment Noise Levels (dB)
APN1 Land Use Lease Area (ft)2 HVAC, Leq Generator, Lmax 021-040-055 Residential 180 31 50
1 Parcel boundaries are shown on Figure 1. 2 Distance was scaled using the provided site plans and City of Patterson Public Inquiry Map.

Source: BAC. 2022.

Because the proposed HVAC unit could potentially be in operation during nighttime hours, the operation of the HVAC unit would be subject to the General Plan nighttime noise level standard of 45 dB Leq (Table 1). As indicated in Table 2, the predicted HVAC equipment noise level of 31 Environmental Noise Assessment
CVL01687 AT&T Cellular Facility- Patterson, California
Page3

8.1.b
Packet Pg. 118 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Bollard Acoustical Consultants, Inc.
dB Leq at the property line of the nearest noise-sensitive use (APN: 021-040-055, residential) would satisfy the General Plan 45 dB Leq nighttime noise level limit by a wide margin. As a result, no further consideration of HVAC equipment noise mitigation measures would be warranted for the project.

Because the project generator would only operate during daytime hours for brief periods required for testing and maintenance, and because generator noise is assumed to be exempt during emergency operations, noise from the generator would be subject to the General Plan daytime noise level standard of 70 dB Lmax. As shown in Table 2, the predicted generator noise level of 50 dB Lmax at the property line of the nearest noise-sensitive use (APN: 021-040-055, residential) would satisfy the General Plan 70 dB Lmax daytime noise level standard by a wide margin. As a result, no further consideration of emergency generator noise mitigation measures would be warranted for the project.

Conclusions
Based on the equipment noise level data and analyses presented above, project-related equipment noise exposure is expected to satisfy the applicable City of Patterson General Plan noise level criteria at the closest noise-sensitive uses. As a result, no further consideration of project equipment noise mitigation measures would be warranted for this project.

This concludes our environmental noise assessment for the proposed CVL01687 AT&T Cellular Facility in Patterson, California. Please contact BAC at (530) 537-2328 or [email protected] with any questions or requests for additional information.

Environmental Noise Assessment
CVL01687 AT&T Cellular Facility- Patterson, California
Page4

8.1.b
Packet Pg. 119 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Appendix A
Acoustical Terminology
Acoustics The science of sound.

Ambient Noise The distinctive acoustical characteristics of a given space consisting of all noise sources audible at that location. In many cases, the term ambient is used to describe an existing or pre-project condition such as the setting in an environmental noise study.

Attenuation The reduction of an acoustic signal.

A-Weighting A frequency-response adjustment of a sound level meter that conditions the output signal to approximate human response.

Decibel or dB Fundamental unit of sound. A Bell is defined as the logarithm of the ratio of the sound pressure squared over the reference pressure squared. A Decibel is one-tenth of a Bell.

CNEL Community Noise Equivalent Level. Defined as the 24-hour average noise level with noise occurring during evening hours (7 - 10 p.m.) weighted by a factor of three and nighttime hours weighted by a factor of 10 prior to averaging.

Frequency The measure of the rapidity of alterations of a periodic signal, expressed in cycles per second or hertz.

IIC Impact Insulation Class (IIC): A single-number representation of a floor/ceiling partition's impact generated noise insulation performance. The field-measured version of this number is the FIIC.

Ldn Day/Night Average Sound Level. Similar to CNEL but with no evening weighting.

Leq Equivalent or energy-averaged sound level.

Lmax The highest root-mean-square (RMS) sound level measured over a given period of time.

Loudness A subjective term for the sensation of the magnitude of sound.

Masking The amount (or the process) by which the threshold of audibility is for one sound is raised by the presence of another (masking) sound.

Noise Unwanted sound.

Peak Noise The level corresponding to the highest (not RMS) sound pressure measured over a given period of time. This term is often confused with the "Maximum" level, which is the highest RMS level.

RT so The time it takes reverberant sound to decay by 60 dB once the source has been removed.

STC Sound Transmission Class (STC): A single-number representation of a partition's noise insulation performance. This number is based on laboratory-measured, 16-band (1/3- octave) transmission loss (TL) data of the subject partition. The field-measured version of this number is the FSTC.
~ \\\\ BOLLARD 1-'\J J J)) Acoustical Consultants

8.1.b
Packet Pg. 120 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Appendix B
~
Typical A-Weighted Sound Levels of Common Noise Sources Decibel Scale (dBA)*
12-Gauge Shotgun 160
Chainsaw 110
Motorcycle 100
Lawn Mower 90
Vacuum Cleaner 80
Pin Falling 15
Jet Takeott 140
Pneumatic Riveter 124
Hammer Drill 114
Rock Concert 105
Tractor/Hand Drill 97
~
Cily i,affic 78
- - - -
fl.et1nr.Ji lrnn~~t" ~ I
·s.:vws
1/\W~ COC rp. ·r.1,;r;M~'J>O,'.,(a'~:C, r,e-,
n11p;:t-H=~..ll~crtl(n-al0',\!Q ma,,.ctrn

8.1.b
Packet Pg. 121 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Appendix C
Distmce From
Unit (Feet)
5 10
20 30
40 50
60 70
80 Marvair 15ci Seelllng Dr111e
CCl'dele, Georgia 311115
229-273-07~
Sound Pressw-e LeYel for the lndU-strial Pioduct Air Conditioners (dBi\.) Model "umb-er
ECUA06ACA E(UAOSACA ECUAOUA(A ECt:AOlSACA

51.5 62

50.7 58

47.8 55

46.5 51

45.6 45.6
Notes: ( 1) Date: July 1,2019
(2) Bsckgroond SoiJlld Pressure Level: 41 d5A
(3) Sound Level Meter I Meter Above Gn,..md DiTealy in Line 'hith Outdo« Coil (4) All units -410A Refrigerant

8.1.b
Packet Pg. 122 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Appendix D
GENERAC' j lI\11:JIJ~TRIAL
S0030
H ...,
w
HIE
H
~ ..
w
I!! E E
' ,, H ~ . ' ..
. 11 I
L
i El
H
did
c5
-
L w
~
0 MDEQ OPT
0 Florida DERM/DEP OPT
0 Chicago Fire Code OPT
0 IFC Certification CALL
0 ULC CALL
Other Custom Options Available from your
Generac Industrial Power Dealer
dimensions, weights and sound levels

OPEN SET

RUNTIME USABLE

HOURS CAPACITY
(GAL) L w H WT dBA'
NO TANK 76 38 46 2060
20 54 76 38 59 2540
48 132 76 38 71 2770 82
77 211 76 38 83 2979
109 300 93 38 87 3042

STANDARD ENCLOSURE

RUN TIME USABLE

HOURS CAPACITY
(GAL) L w H WT dBA"
NO TANK 95 38 50 2362
20 54 95 3B 63 2842
48 132 95 38 75 3072 77
77 211 95 38 87 3281
109 300 95 36 91 3344
LEVEL 1 ACOUSTIC ENCLOSURE

RUN TIME USABLE

HOURS CAPACITY
(GAL) L w H WT dBA'
NO TANK 11 3 38 50 2515
20 54 113 38 63 2995
48 132 11 3 38 75 3225 70
77 211 113 38 87 3434
109 300 11 3 38 91 3497
LEVEL 2 ACOUSTIC ENCLOSURE

RUN TIME USABLE
CAPACITY HOURS (GAL) L w H WT dBA'
NO TANK 95 38 62 2520
20 54 95 38 75 3000
48 132 95 36 67 3230 66
77 211 95 36 99 39
109 300 95 38 103 3502
• All measurements are approximate and lor estimalion purposes only Weights are without luel in tank Sound levels measured at 2311 (Im) and does 001 account lor ambienl sile cond itions.

YOUR FACTORY RECOGNIZED GENERAC INDUSTRIAL DEALER
Spec~ication characteristics may change without notice Dimensions and weights are for pr'tl1minary purposes Dtll:,o. Please consul! a Generac Power Systems Industrial Dealer lor detailed 1nstallabon drawings Generac Power Systems, Inc. • S45 W29290 HWY. 59, Waukesha, WI 53189 • generac.com Q2012 Genera, Power Systems, Inc All righls reseived. All specihc,tions are sut>ject 10 change WllhoU11101,ce Bulletin 0195010SBY-B / Pl'inted ill u SA 02/15112

8.1.b
Packet Pg. 123 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Radio Frequency - Electromagnetic Energy
(RF-EME) Compliance Report
Site Number: CVL0 1687
RFDS ID: 5542661
Pace Number: MRSFR053894/MRSFR065826/MRSFR065873/
M RSFR065960/M RSFR065943/M RSFR089958/ M RSFR06584 I
Patterson
I 025 West Las Palmas Avenue
Patterson, California 95363
Stanislaus County .

37.46688056; -121.14255556 NAD83
Tower
The proposed AT&T installation will be in compliance with FCC regulations upon proper installation of recommended signage.

EBI Project No. 6223001457
April 19, 2023
Prepared for:

AT&T Mobility, LLC
c/o Complete Wireless Consulting Inc
2009 V Street
Sacramento, CA 95818

8.1.b
Packet Pg. 124 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l687
I 025 West Las Palmas Avenue, Patterson, California

TABLE OF CONTENTS
EXECUTIVE SUMMARY ..................................................................................................................... I

1.0 FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS ................................... 3

2.0 AT&T RF EXPOSURE POLICY REQUIREMENTS .................................................................... 5

3.0 WORST-CASE PREDICTIVE MODELING ................................................................................. 5 4,0 RECOMMENDED SIGNAGE/COMPLIANCE PLAN .................................................................... 7

5.0 SUMMARY AND CONCLUSIONS ............................................................................................. 8

6.0 LIMITATIONS ......................................................................................................................... 8 Appendix A
Appendix B
Personnel Certifications
Compliance/Signage Plan

APPENDICES
EBI Consulting ♦ 21 B Street ♦ Burlington, MA 01803 ♦ 1.800.786.2346

8.1.b
Packet Pg. 125 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457

EXECUTIVE SUMMARY
Purpose of Report
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California
EnviroBusiness Inc. (dba EBI Consulting) has been contracted by AT&T Mobility, LLC to conduct radio frequency electromagnetic (RF-EME) modeling for AT&T Site CVL0 1687 located at 1025 West Las Palmas Avenue in Patterson, California to determine RF-EME exposure levels from proposed AT&T wireless communications equipment at this site. As described in greater detail in Section 1.0 of this report, the Federal Communications Commission (FCC) has developed Maximum Permissible Exposure (MPE) Limits for general public exposures and occupational exposures. This report summarizes the results of RF-EME modeling in relation to relevant FCC RF-EME compliance standards for limiting human exposure to RF-EME fields.

This report contains the RF EME analysis for the site, including the following:
• Site Plan with antenna locations
• Graphical representation of theoretical MPE fields based on modeling • Graphical representation of recommended signage and/or barriers This document addresses the compliance of AT&T's transmitting facilities independently and in relation to all collocated facilities at the site.

Statement of Compliance
A site is considered out of compliance with FCC regulations if there are areas that exceed the FCC exposure limits and there are no RF hazard mitigation measures in place. Any carrier which has an installation that contributes more than 5% of the applicable MPE must participate in mitigating these RF hazards.

As presented in the sections below, based on worst-case predictive modeling, there are no modeled exposures on any accessible canopy and ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site.

Additionally, there are areas where elevated workers may be exposed to power densities greater than the occupational limits. The worst-case emitted power density may exceed the FCC's occupational limit within approximately 39 feet of AT&T's proposed antennas at the antenna face level. Workers and the general public should be informed about the presence and locations of antennas and their associated fields.

As such, the proposed AT&T installation is in compliance with FCC regulations upon proper installation of recommended signage and/or barriers.

AT&T Recommended Signage/Compliance Plan
AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, requires that:

I. All sites must be analyzed for RF exposure compliance;

2. All sites must have that analysis documented; and

3. All sites must have any necessary signage and barriers installed.

Site compliance recommendations have been developed based upon protocols presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, additional guidance provided by AT&T, EBl's understanding of FCC and OSHA requirements, and common EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346

8.1.b
Packet Pg. 126 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l 687
1025 West Las Palmas Avenue, Patterson, California
industry practice. Barrier locations have been identified (when required) based on guidance presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014.

The following signage is recommended at this site:
• Yellow CAUTION 2B sign posted at the base of the tower near the climbing ladder.

The signage proposed for installation at this site complies with AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document and therefore complies with FCC and OSHA requirements. Barriers are not recommended on this site. To reduce the risk of exposure and/or injury, EBI recommends that access to the tower or areas associated with the active antenna installation be restricted and secured where possible. More detailed information concerning site compliance recommendations is presented in Section 4.0 and Appendix B of this report.

EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 2

8.1.b
Packet Pg. 127 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California

1.0 FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS The FCC has established Maximum Permissible Exposure (MPE) limits for human exposure to Radiofrequency Electromagnetic (RF-EME) energy fields, based on exposure limits recommended by the National Council on Radiation Protection and Measurements (NCRP) and, over a wide range of frequencies, the exposure limits developed by the Institute of Electrical and Electronics Engineers, Inc. (IEEE) and adopted by the American National Standards Institute (ANSI) to replace the 1982 ANSI guidelines. Limits for localized absorption are based on recommendations of both ANSI/IEEE and NCRP.

The FCC guidelines incorporate two separate tiers of exposure limits that are based upon occupational/controlled exposure limits {for workers) and general public/uncontrolled exposure limits for members of the general public.

Occupational/controlled exposure limits apply to situations in which persons are exposed as a consequence of their employment and in which those persons who are exposed have been made fully aware of the potential for exposure and can exercise control over their exposure. Occupational/ controlled exposure limits also apply where exposure is of a transient nature as a result of incidental passage through a location where exposure levels may be above general public/uncontrolled limits (see below), as long as the exposed person has been made fully aware of the potential for exposure and can exercise control over his or her exposure by leaving the area or by some other appropriate means.

General public/uncontrolled exposure limits apply to situations in which the general public may be exposed or in which persons who are exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure. Therefore, members of the general public would always be considered under this category when exposure is not employment-related, for example, in the case of a telecommunications tower that exposes persons in a nearby residential area.

Table I and Figure I (below), which are included within the FCC's OET Bulletin 65, summarize the MPE limits for RF emissions. These limits are designed to provide a substantial margin of safety. They vary by frequency to take into account the different types of equipment that may be in operation at a particular facility and are "time-averaged" limits to reflect different durations resulting from controlled and uncontrolled exposures.

The FCC's MPEs are measured in terms of power (mW) over a unit surface area (cm2). Known as the power density, the FCC has established an occupational MPE of 5 milliwatts per square centimeter (mW/cm2) and an uncontrolled MPE of I mW/cm2 for equipment operating in the 1900 MHz frequency range. For the AT&T equipment operating at 850 MHz, the FCC's occupational MPE is 2.83 mW/cm2 and an uncontrolled MPE of 0.57 mW/cm2. For the AT&T equipment operating at 700 MHz, the FCC's occupational MPE is 2.33 mW/cm2 and an uncontrolled MPE of 0.47 mW/cm2. These limits are considered protective of these populations.

Table I: Limits for Maximum Permissible Exposure (MPE)
(A) Limits for Occupational/Controlled Exposure
Frequency Range Electric Field Magnetic Field Power Density (S) Averaging Time (MHz) Strength (E) Strength (H) (mW/cm2
) [E]2, [H] 2
, or S
(Vim) (Alm) (minutes)

0.3-3.0 614 1.63 ( 100)* 6

3.0-30 1842/f 4.89/f (900/f)* 6
30-300 61.4 0.163 1.0 6
300-1,500 -- -- f/300 6
1,500-100,000 - -- 5 6
EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 3

8.1.b
Packet Pg. 128 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
(B) Limits for General PublidUncontrolled Exposure
Frequency Range Electric Field Magnetic Field Power Density (5) (MHz) Strength (E) Strength (H) (mW/cm2 ) (V/m) (Alm)

0.3-1.34 614 1.63 (100)*

1.34-30 824/f 2.19/f (180/f)*
30-300 27.5 0.073 0.2
300-1,500 -- - f/1 ,500

1.500-100,000 -- - 1.0
f = Frequency in (MHz)
* Plane-wave equivalent power density
Figure 1. FCC Limits for Maximum Permissible Exposure (MPE) Plane-wave Equivalent Power Density
100 N
E
0 ~
-S
~ 10
"iii
C: 5 Q)
0 ai
~ 1 0
a..

0.2 0. 1
\
\
- Occupational/Controlled Exposure
- - - - General Population/Uncontrolled Exposure
\ / ,_ - - - _.,. /
✓
/
,,- - - - - - - - - -
Averaging Time
[E] 2, [H] 2, or S
(minutes)
30 30
30 30
30 0.03 0.3 1 3 30

1.34 300 13,000
t,500
30,000 1300,000
100,000
Frequency (MHz)
Based on the above, the most restrictive thresholds for exposures of unlimited duration to RF energy for several personal wireless services are summarized below:

Personal Wireless Service Approximate Occupational Public MPE Frequency MPE Microwave (Point-to-Point) 5,000 - 80,000 MHz 5.00 mW/cm2 1.00 mW/cm2 Broadband Radio (BRS) 2,600 MHz 5.00 mW/cm2 1.00 mW/cm2 Wireless Communication (WCS) 2,300 MHz 5.00 mW/cm2 1.00 mW/cm2 Advanced Wireless (AWS) 2, 100 MHz 5.00 mW/cm2 1.00 mW/cm2 Personal Communication (PCS) 1,950 MHz 5.00 mW/cm2 1.00 mW/cm2 Cellular Telephone 870 MHz 2.90 mW/cm2 0.58 mW/cm2
Specialized Mobile Radio (SMR) 855 MHz 2.85 mW/cm2 0.57 mW/cm2 Lonj!'. Term Evolution (L TE) 700 MHz 2.33 mW/cm2 0.47 mW/cm2 Most Restrictive Frequency Ranj!'.e 30-300 MHz 1.00 mW/cm2 0.20 mW/cm2 MPE limits are designed to provide a substantial margin of safety. These limits apply for continuous exposures and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health.

EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 4

8.1.b
Packet Pg. 129 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California
Personal Communication (PCS) facilities used by AT&T in this area operate within a frequency range of 700-1900 MHz. Facilities typically consist of: I) electronic transceivers (the radios or cabinets) connected to wired telephone lines; and 2) antennas that send the wireless signals created by the transceivers to be received by individual subscriber units (PCS telephones). Transceivers are typically connected to antennas by coaxial cables.

Because of the short wavelength of PCS services, the antennas require line-of-site paths for good propagation, and are typically installed above ground level. Antennas are constructed to concentrate energy towards the horizon, with as little energy as possible scattered towards the ground or the sky.

This design, combined with the low power of PCS facilities, generally results in no possibility for exposure to approach Maximum Permissible Exposure (MPE) levels, with the exception of areas directly in front of the antennas.

2.0 AT&T RF EXPOSURE POLICY REQUIREMENTS
AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, requires that:

I. All sites must be analyzed for RF exposure compliance;

2. All sites must have that analysis documented; and

3. All sites must have any necessary signage and barriers installed.

Pursuant to this guidance, worst-case predictive modeling was performed for the site. This modeling is described below in Section 3.0. Lastly, based on the modeling and survey data, EBI has produced a Compliance Plan for this site that outlines the recommended signage and barriers. The recommended Compliance Plan for this site is described in Section 4.0.

3.0 WORST-CASE PREDICTIVE MODELING
In accordance with AT&T's RF Exposure policy, EBI performed theoretical modeling using RoofMaster™ software to estimate the worst-case power density at the site canopy and ground-level and/or nearby rooftops resulting from operation of the antennas. RoofMaster TM is a widely-used predictive modeling program that has been developed to predict RF power density values for rooftop and tower telecommunications sites produced by vertical collinear antennas that are typically used in the cellular, PCS, paging and other communications services. Using the computational methods set forth in Federal Communications (FCC) Office of Engineering & Technology (OET) Bulletin 65, "Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields" (OET-65), RoofMaster TM calculates predicted power density in a scalable grid based on the contributions of all RF sources characterized in the study scenario. At each grid location, the cumulative power density is expressed as a percentage of the FCC limits. Manufacturer antenna pattern data is utilized in these calculations. RoofMaster™ models consist of the Far Field model as specified in OET-65 and an implementation of the OET-65 Cylindrical Model (Sula9). The models utilize several operational specifications for different types of antennas to produce a plot of spatially-averaged power densities that can be expressed as a percentage of the applicable exposure limit. A statistical power factor may be applied to the antenna system based on guidance from the carrier and system manufacturers.

For this report, EBI utilized antenna and power data provided by AT&T and compared the resultant worst-case MPE levels to the FCC's occupational/controlled exposure limits outlined in OET Bulletin 65.

The assumptions used in the modeling are based upon information provided by AT&T and information gathered from other sources. There are no other wireless carriers with equipment installed at this site.

Based on worst-case predictive modeling, there are no modeled exposures on any accessible canopy and ground walking/working surface related to ATT's proposed antennas that exceed the FCC's EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 5

8.1.b
Packet Pg. 130 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l687
1025 West Las Palmas Avenue, Patterson, California
occupational and/or general public exposure limits at this site. Additionally, there are areas where elevated workers may be exposed to power densities greater than the occupational limits. The worstcase emitted power density may exceed the FCC's occupational limit within approximately 39 feet of AT&T's proposed antennas at the antenna face level. Workers and the general public should be informed about the presence and locations of antennas and their associated fields.

At the nearest walking/working surfaces to the AT&T antennas on the canopy, the maximum power density generated by the AT&T antennas is approximately 15.03 percent of the FCC's general public limit (3.0 I percent of the FCC's occupational limit). The composite exposure level from all carriers on this site is approximately 15.03 percent of the FCC's general public limit (3.0 I percent of the FCC's occupational limit) at the nearest walking/working surface to each antenna. Based on worst-case predictive modeling, there are no areas at ground/street level related to the proposed AT&T antennas that exceed the FCC's occupational or general public exposure limits at this site. At ground/street level, the maximum power density generated by the antennas is approximately 8.05 percent of the FCC's general public limit ( 1.61 percent of the FCC's occupational limit).

A graphical representation of the RoofMaster ™ modeling results is presented in Appendix B.

Microwave dish antennas are designed for point-to-point operations at the elevations of the installed equipment rather than ground-level coverage. Based on AT& T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, microwave antennas are considered compliant if they are higher than 20 feet above any accessible walking/working surface. All microwaves on site are considered compliant with AT&T's guidance and were not included in the modeling analysis.

EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 6

8.1.b
Packet Pg. 131 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457

4.0 RECOMMENDED SIGNAGE/COMPLIANCE PLAN
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
Signs are the primary means for control of access to areas where RF exposure levels may potentially exceed the MPE. As presented in the AT&T guidance document, the signs must:
• Be posted at a conspicuous point;
■ Be posted at the appropriate locations;
• Be readily visible; and
• Make the reader aware of the potential risks prior to entering the affected area.

The table below presents the signs that may be used for AT&T installations.

CRAN/ HETNET Small Cell Decals/ Signs Alerting Signs
NOTICE (Cf>)
RF energy emitted by lhl• antenna m•y uceed lhe FCC"• npMure limits fot the general population.

Sby al leasl 1 feel away from the antenna.

Call AT&T al 800-638-2822. option 9 lhen 3, lor help of you need acctss within ftet. nOM,oou- kDl9't
NOTICE Cy) AT&T operaln 1n1onn.11 at 1h11, structur•
thb; po,nt you are entonng 1n
,,.,. where radio fr~uency tRFJ ~kf•
may HC'Nd 1h• FCC Gen•r•I Population
Up(KUfe limits
Follow safety guldehnn for ~Ing jn an
RF environment
KNp ft away from the front& ol the
antonn,11 .•
Contact AT&T at 800-6l8·2822, opt 9. 3
ornd foll.ow their ln5ll'\lc0ons pnor to
porforml11g any mJinlonanco or r•~i"
:,bove lht'S polnl
This 11 AT&T Sile USIO __ _
RF onorgy omlttod by lhlunlonna m~y n<ff<llho FCC's
occupallonal exposu,e limits.

Slay at leasl 1 leel away lrom lhe antenna.

Call AT&T al 800-638-2822. option 9 lhen J, lor help II you need access within 1 foel. ur• ,u..1u ..,m:i
A CAUTION &, AT&T operaln 1ntonnn 1t lh.S 1lru~lure,
lh~ point you Art entitring 1n
Utui wh.,. radio froqu.ncy tRF') rlelds
m..y oxcHd lhe FCC OccupaUon.al
uposure limtts.
fol'°1iw ufaty ;uhklinn to, .....otklng in 1n
RF 1,wlr011ment
KNp fl awAy from the fronts of~
Antitnnas.

ContACI AT&T .11800-638-2822. opt 9. l
1nd lollow thei, Instructions prior IO
porlonnlr.g 1n1 malnlenar,c• or rtp.alra
abaw• this ~nl Coll Sito USIO __ _
NOTICE
DECAL
NOTICE
SIGN

CAUTION
DECAL

CAUTION
SIGN
m -=~- ----

TRILINGUAL
NOTICE
0 .A.CAUTION°
M i'U•.-0--.11•••
!:'!:t::;-=:.;~11! fl!~(~ .....
...... ,_""'"',_,_ ... ~·-· c-,a lo11:d-UlllU,,_,.._, _. I ,ftJIIAla~-----·,..._. __,.,.,.......,., .. ,_ CAUTION 2-

ROOFTOP
0 .A.CAUTION.

M ~..,._,..,..,. ___ artu,
-,,--,a,f«Clit.-.,~I
t,..dC-11-----llb.-fMI M
....
....... .. , .
.......
. ..,....~- " .. ~ ..... ..__.....,.._.,_...,_,.,....,.. ----::a•N--ll!lt"l...-11 •---_a •--- 11:--•••r. __ __...... __ CAUTION 2BTOWER
~1,1.c:p11Mae-•.,..·· ,.,..,,..,,.,_.. .. ~il"-
.._r»,"""')l. 1"4t\...,r,, H:CC<~l~:,w.
f,i.,, .. W,-1,;i«1'1't"'~b..-..... 11••~-talf-Qn..--.....-. t,t,,.11:,1,1:-u.sa.:1:t.,r.ntft)
.::.,...i:.,.t1.1ta:ru1t~ _.. .. _ .....

WARNING 1B
EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 NOTICE
.,__,,,,,,,, '7ll ... ~---•11111• ,... _____ ,. __ ...,. • .,...t-111~ --,..... ..,,a:"'9u~W.-Ui!!b , ... W11rr,-...n111 .. ..,.. .....
-
O-.J&:&1••w!ffl~-..,.,,. •• ---.-....~_......,,, ~·~~n...-.

NOTICE 2

A CAUTION
A .&JlillPfll~C!flllt\.rtftr.Wf
qB,Sll#pff .... JQ,JL'THlnlt>i'h/nl
Mm1.1t.cl~fl'k'J!Pll~-,f:fffHlllf
K(Duur,.ihct11il,:p,wtlllnt\.
lotb,i,w.'rtJ~rlmnlcrntill;l
_, 11n.r
(l"l\1rtAJ,1111«'1H11&2l,c,:to,119~1
................ ,.,.... ~~r,;" o, """n.,dwi 111t i:,lf"'C n, CAUTION 2A 0
.A. CAUTION.

M ,,,,..,, .. ,_,.._~-~ - --~M.,._,,~ _.. t«~llu~Lllla. , ... U'IMI ........ ~----· -
~.&!ilflQ,lllJJJl.~•wt ---~
~.,...,, ... ~ ... ... tM -~ ...
. ---------=--·
CAUTION 2CPARAPETS
~/ )~\' :· '-: , /1:'~
~u:.._t1., _:..d:•
»,! ..... - ....... .,.,...., ... ,-:..,-,.,,,..,. ..... ~~ra::•...,,-..:-w •a~r~1,-. . .. ,,~ ... ~.-~-~ .. ... ~c-.1"""""_ .. ,.., C..,;1&·.i111)QU.:tll.1D1:0al .. l r,bkwr-w..,_,,....~ .. prt,,-i ~,:, ..... .,-.!!',~ .. , --- ---- WARNING 2A
7 8.1.b
Packet Pg. 132 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 622300 I ~57
USID No. 324890 Site No. CVL0 1687
I 025 West Las Pal mas Avenue, Patterson, California
Based upon protocols presented in AT&Ts RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, and additional guidance provided by AT&T, the following signage is recommended on the site:
• Yellow CAUTION 2B sign posted at the base of the tower near the climbing ladder.

No barriers are required for this site. Barriers should be constructed of weather-resistant plastic or wood fencing. Barriers may consist of railing, rope, chain, or weather-resistant plastic if no other types are permitted or are feasible. Painted stripes should only be used as a last resort and only in regions where there is little chance of snowfall. If painted stripes are selected as barriers, it is recommended that the stripes and signage be illuminated. The signage and any barriers are graphically represented in the Signage Plan presented in Appendix B.

5.0 SUMMARY AND CONCLUSIONS
EBI has prepared this Radiofrequency Emissions Compliance Report for the proposed AT&T telecommunications equipment at the site located at I 025 West Las Palmas Avenue in Patterson, California.

EBI has conducted theoretical modeling to estimate the worst-case power density from AT&T antennas to document potential MPE levels at this location and ensure that site control measures are adequate to meet FCC and OSHA requirements, as well as AT&Ts corporate RF safety policies. As presented in the preceding sections, based on worst-case predictive modeling, there are no modeled exposures on any accessible canopy and ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site. Additionally, there are areas where elevated workers may be exposed to power densities greater than the occupational limits. The worst-case emitted power density may exceed the FCC's occupational limit within approximately 39 feet of AT&T's proposed antennas at the antenna face level. Workers and the general public should be informed about the presence and locations of antennas and their associated fields.

To reduce the risk of exposure and/or injury, EBI recommends that access to the tower or areas associated with the active antenna installation be restricted and secured where possible. Signage is recommended at the site as presented in Section 4.0 and Appendix B. Posting of the signage brings the site into compliance with FCC rules and regulations and AT&T's corporate RF safety policies.

All workers and individuals accessing the tower or persons (including arborists), accessing elevated structures or trees within areas exceeding the general public MPE, must be made aware of the presence and locations of antennas and t heir associated fields, where applicable.

6.0 LIMITATIONS
This report was prepared for the use of AT&T Mobility, LLC to meet requirements outlined in AT&Ts corporate RF safety guidelines. It was performed in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same locale under like circumstances. The conclusions provided by EBI and its partners are based solely on information supplied by AT&T, including modeling instructions, inputs, parameters and methods. Calculations, data, and modeling methodologies for C Band equipment include a statistical factor reducing the power to 32% of maximum theoretical power to account for spatial distribution of users, network utilization, time division duplexing, and scheduling time. AT&T recommends the use of this factor based on a combination of guidance from its antenna system manufacturers, .supporting international industry standards, industry publications, and its extensive experience. The observations in this report are valid on the date of the investigation. Any additional information that becomes available concerning the site EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 • 1.800.786.2346 8

8.1.b
Packet Pg. 133 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVLOl687
I 025 West Las Pal mas Avenue, Patterson, California
should be provided to EBI so that our conclusions may be revised and modified, if necessary. This report has been prepared in accordance with Standard Conditions for Engagement and authorized proposal, both of which are integral parts of this report. No other warranty, expressed or implied, is made.

EBI Consulting ♦ 21 B Street ♦ Burlington, MA O 1803 ♦ 1.800.786.2346 9

8.1.b
Packet Pg. 134 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l687
I 025 West Las Palmas Avenue, Patterson, California
Appendix A
Personnel Certifications
EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 10

8.1.b
Packet Pg. 135 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California
Preparer Certification
I, Ian Swanson, state that:
•
•
•
•
•
I am an employee of EnviroBusiness Inc. (d/b/a EBI Consulting), which provides RF-EME safety and compliance services to the wireless communications industry.

I have successfully completed RF-EME safety training, and I am aware of the potential hazards from RF-EME and would be classified "occupational" under the FCC regulations.

I am fully aware of and familiar with the Rules and Regulations of both the Federal Communications Commissions (FCC) and the Occupational Safety and Health Administration (OSHA) with regard to Human Exposure to Radio Frequency Radiation.

I have been trained in on the procedures outlined in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document (dated October 28, 2014) and on RF-EME modeling using RoofMaster ™ modeling software.

I have reviewed the data provided by the client and incorporated it into this Site Compliance Report such that the information contained in this report is true and accurate to the best of my knowledge.

EBI Consulting • 21 B Street • Burlington, MAO 1803 ♦ 1.800.786.2346 11

8.1.b
Packet Pg. 136 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Pal mas Avenue, Patterson, California
Reviewed and Approved by:
sealed 19apr2023
Michael McGuire
Electrical Engineer
[email protected]
Note that EBl's scope of work is limited to an evaluation of the Radio Frequency - Electromagnetic Energy (RF-EME) field generated by the antennas and broadcast equipment noted in this report. The engineering and design of the building and related structures, as well as the impact of the antennas and broadcast equipment on the structural integrity of the building, are specifically excluded from EBl's scope of work.

EBI Consult ng ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 12

8.1.b
Packet Pg. 137 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
Appendix B
Compliance/Signage Plan
EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 13

8.1.b
Packet Pg. 138 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
Nearest Walking Surface Simulation
D
fl 'IU"P••Ptll•-
1 : I .,.. ........ . ,---,
'- --'
Proposed CAUTION
2B Sign at the Base of
the tower
Existing Sign
Proposed Sign
Installed Sign
SECTOR 8
GROUND= O'
GROUND= O'
C!IZD
,.~
..
--• ... ,··:·. :~;:
~ -;..-.:.~::=. ~-~--- --- c~,- -·s
· ..- - '?' , ... ¥;
Percent M PE Legehd
□ 0% -100%
• 100% · 500%
□ 500% · 5000%
• 5000% +
Generol Populallon Limb
Sula 09
F arField Overlay
Reflection f1 , 61
10 foot grid size
[Avg: 20 to 26 Feet)
Carrier Color Code
ATT
IT]

SIGN IDENTIFICATION LEGEND
AT&T NOTICE 2 Sign ·-.4. AT&T CAUTION 2 - Rooftop Sign 2= AT&TWARNING IBand2ASigns -a,-~ -" AT&T CAUTION 2B-TowerSign AT&T NOTICE Small Cell Signs ·-..Q-. AT&T CAUTION 2C - Parapet Sign AT&T CAUTION Small Cell Signs ~ AT&T TRILINGUAL NOTICE Sign ~ EBI Consulting ♦ 21 B Street ♦ Burlington, MA O 1803 ♦ 1.800.786.2346 14

8.1.b
Packet Pg. 139 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.)

8.1.b
Packet Pg. 140 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) Disclaimer
"AT&T PROPRIETARY -- This information constitutes confidential trade secrets and commercial or financial information owned by AT&T and is shared for Critical Infrastructure Protection purposes only. It is exempt from disclosure under the Freedom of Information Act (5 U.S.C. 552), Exemptions (b)(3)&(4), and its disclosure is prohibited under the Trade Secrets Act (18 U.5.C. 1905), the Critical Infrastructure Information Act of 2002, 6 U.S.C. § 133, and any State or local law requiring disclosure of information or records. This information must not be copied or distributed to others not agreed upon by AT&T, but in all events do not copy or distribute to such others without notification pursuant to Executive Order 12600." Prr.ii111<>li:1 IY ~nd c,111fkl1-11t:il l Bt15.1i1•·~s ltr\il'IJlcrtl<ln 0f ATaT ,' - ·
·- at&t '· ,.

8.1.b
Packet Pg. 141 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and isting ,_
L TE 700 Cover
~
I Reliable Service Indoors/Outdoors
Reliable Coverage in Transit
Indoor Coverage Less Reliable
I Reliable Coverage Outdoors Only
Indoor Coverage Less Reliable
e Existing site
e Proposed site
Proprietary and Confidential Business lnfom1ation of AT&T ~~11~ ,
-~~\Jw ,--~.
:'wlL: .... . . if ~ · ... .;-...=., - ~ -
~ I ' ~,/·r!~ - . - '- l :~, ~ --~ ,'--· • I «:;--""t"•' ~.. . ~ ..• • c ~~ - ~~t ~(••- J. - . ,1\\. -
- ;.,::;.,.; . ').. " ¾~ . t ~\~~~~
~ . . \\ ~ .".".,,, 1. , ~... .? •• -<"I: I 'I!
-- itllll
,i - _I,
r.;~ . ~
, wr
0 ~
1 ~ .,yr t . .

5.- -~1
J~!
-:- "' I ., .,.,. ..II.
~, , I~
miles
. :-
, ;e. • ~ - .. '·--=---··at~t

8.1.b
Packet Pg. 142 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and Proposed L TE 700 Coverage - 1025 West Las Palmas Avenue @ RC = 74 ft r _:L. ~ .. ~. E•- ~\ ~J. ~ I .... ::ill., ~... .,,•. '\ , .. ~ •~

11.L ···~,, . .. • • ..,, . I\\,~ . : ..... · ·• • :ci~~ . ,'-: <.•;:,·,··' • .,, ' . -· --._, ~. ·r ~\·. ;, .·., l·.',,-!::, ·1 ~-:1;:;e'i ~I c~· .. ,~ .. _, ~ 1·: ,;'_ ~ ,.. .. """\ ,., '- :: ;: • ,. c,1,1•,,, ,. ., Ii·#~~\
:: ~ . ;.: ' (,,;J" ::,,-, ,._ , •. -:. i <• •••••n,i," .~ ·. ~~-.I.:. 11,·::_!, ',, 1 '· I ._ I . 1 ::!"'I - _ _ .-_.• .. ., .1 ·1 - l ·-~ .... -- 1 .r. "Ii r ,.. ---' ,~ . - ~ -~ ~~
= ==:}/ l I C I .~~: ~ - ~ ,) ,~,ll;.'!./i7 j ,,p_., ·,, :', '? ]• ...... ,:,.. ----.~ - 1', ·, 11:':•,"')l f~J ''f,:•/', r ,~ .. ~1 \ .., 0'' ,P I
--·-· ' I- ,
f,·-1~· .: •·b •1-.. ;~ .. ··
Legend
I Reliable Service Indoors/Outdoors
Reliable Coverage in Transit
Indoor Coverage Less Reliable
I Reliable Coverage Outdoors Only
Indoor Coverage Less Reliable
e Existing site
e Proposed site
,- ,J
/;.,,,,,, •'11 C
~
'1_ I_ Jt, 1-. .,.. ·~
_J r ....r ,-: ..... :~ --
- . .
r . 1-;:;-=---. ~ "" .:. : . :: ,, ;, ·,· ........... - --- Proprietary and Confidential Business Information of AT&T ·-i~ ~ ..... ~~, , :.,mm,I.~ ~ ~ L,~, I L
~.
~ -i:.~.~- .... ' ~-( ._, • -t'-.,: _ IIQ:llf
·--:;_ ~-~, .
~ #'J ~ -j
~ ~ -~"'T•. , , ~-:--, I ~
~~ i -; ~ ~(~' ··~ -j.. ~ . -~J.~
1 -- I ,,:, * .~
\\ "' ' Ill . ,,. ~ .,ai_ ~· ·~ ·'.
·'
... (I -. - - - - -
•· -'; I -,
\
' i . I, -~- .\ ..,
• H I,' I.' II ~.·,] •· ': •._r_· ~. I I
• 1 • ~,l . ,-". J 111111 • r ~ , ri ,1 ,., .. ,. • 1
11 LJ -
1 ~ , ,r / '.c;. 1 '-·4.
- :. = - ri .~- n ~ ..
:
. "L,, _ c:, -. I ~ .:~ ..: .,•,:r•r· i, , :. ; _ ~~ u
7 "II ~ ~
,. h. 111 ] - ~-
~ D.5
miles
;-: __ .... _ -
;• l ,_ :at&t ,..,__..- ·

8.1.b
Packet Pg. 143 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and ,,>

GAVIN NEWSOM
GOVfHNOH
t;ALIFOANIA ......... YANA GARCIA
~~ St'GAFTARY fOA Water Boards .,...., ENVIRONMENTAL rAOTECTION Central Valley Regional Water Quality Control Board
31 July 2023
Joel Andrews
City of Patterson
1 Plaza
Patterson, CA 95363
[email protected]. us

COMMENTS TO REQUEST FOR REVIEW FOR THE NEGATIVE DECLARATION, AT&T WIRELESS TOWER -COMMUNITY CENTER PROJECT, SCH#2023060742,

STANISLAUS COUNTY
Pursuant to the State Clearinghouse's 28 June 2023 request, the Central Valley Regional Water Quality Control Board (Central Valley Water Board) has reviewed the Request for Review for the Negative Declaration for the AT&T Wireless Tower - Community Center Project, located in Stanislaus County.

Our agency is delegated with the responsibility of protecting the quality of surface and groundwaters of the state; therefore, our comments will address concerns surrounding those issues.

I. Regulatory Setting
Basin Plan
The Central Valley Water Board is required to formulate and adopt Basin Plans for all areas within the Central Valley region under Section 13240 of the Porter-Cologne Water Quality Control Act. Each Basin Plan must contain water quality objectives to ensure the reasonable protection of beneficial uses, as well as a program of implementation for achieving water quality objectives with the Basin Plans. Federal regulations require each state to adopt water quality standards to protect the public health or welfare, enhance the quality of water and serve the purposes of the Clean Water Act. In California, the beneficial uses, water quality objectives, and the Antidegradation Policy are the State's water quality standards. Water quality standards are also contained in the National Toxics Rule, 40 CFR Section 131.36, and the California Toxics Rule, 40 CFR Section 131.38.

The Basin Plan is subject to modification as necessary, considering applicable laws, policies, technologies, water quality conditions and priorities. The original Basin Plans were adopted in 1975, and have been updated and revised periodically as required, using Basin Plan amendments. Once the Central Valley Water Board has adopted a Basin Plan amendment in noticed public hearings, it must be approved by the State Water Resources Control Board (State Water Board), Office of MARK BRADFORD, CHAIR I PATRICK PuLUPA, Esa., EXECUTIVE OFFICER 11020 Sun Center Drive #200, Rene ho Cordova, CA 95670 I www.waterboards.ca.gov/centralvalley

8.1.b
Packet Pg. 144 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) AT&T Wireless Tower -
Community Center Project
Stanislaus County
- 2 - 31 July 2023
Administrative Law (OAL) and in some cases, the United States Environmental Protection Agency (USEPA). Basin Plan amendments only become effective after they have been approved by the OAL and in some cases, the USEPA. Every three (3) years, a review of the Basin Plan is completed that assesses the appropriateness of existing standards and evaluates and prioritizes Basin Planning issues. For more information on the Water Quality Control Plan for the Sacramento and San Joaquin River Basins, please visit our website:
http://www.waterboards.ca.gov/centralvalley/water issues/basin plans/ Antidegradation Considerations
All wastewater discharges must comply with the Antidegradation Policy (State Water Board Resolution 68-16) and the Antidegradation Implementation Policy contained in the Basin Plan. The Antidegradation Implementation Policy is available on page 74 at:
https://www. waterboa rds. ca. gov /centralva lley/wate r issues/basin pla ns/sacsj r 2018

05.pdf
In part it states:

Any discharge of waste to high quality waters must apply best practicable treatment or control not only to prevent a condition of pollution or nuisance from occurring, but also to maintain the highest water quality possible consistent with the maximum benefit to the people of the State.

This information must be presented as an analysis of the impacts and potential impacts of the discharge on water quality, as measured by background concentrations and applicable water quality objectives.

The antidegradation analysis is a mandatory element in the National Pollutant Discharge Elimination System and land discharge Waste Discharge Requirements (WDRs) permitting processes. The environmental review document should evaluate potential impacts to both surface and groundwater quality.

II. Permitting Requirements
Clean Water Act Section 404 Permit
If the project will involve the discharge of dredged or fill material in navigable waters or wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the United States Army Corps of Engineers (USAGE). If a Section 404 permit is required by the USAGE, the Central Valley Water Board will review the permit application to ensure that discharge will not violate water quality standards. If the project requires surface water drainage realignment, the applicant is advised to contact the Department of Fish and Game for information on Streambed Alteration Permit requirements. If you have any questions regarding the Clean Water Act Section 404 permits, please contact the Regulatory Division of the Sacramento District of USAGE at (916) 557-5250.

Clean Water Act Section 401 Permit-Water Quality Certification If an USAGE permit (e.g., Non-Reporting Nationwide Permit, Nationwide Permit, Letter of Permission, Individual Permit, Regional General Permit, Programmatic

8.1.b
Packet Pg. 145 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) AT&T Wireless TowerCommunity Center Project
Stanislaus County
- 3 - 31 July 2023
General Permit), or any other federal permit (e.g., Section 10 of the Rivers and Harbors Act or Section 9 from the United States Coast Guard), is required for this project due to the disturbance of waters of the United States (such as streams and wetlands), then a Water Quality Certification must be obtained from the Central Valley Water Board prior to initiation of project activities. There are no waivers for 401 Water Quality Certifications. For more information on the Water Quality Certification, visit the Central Valley Water Board website at:
https://www.waterboards.ca.gov/centralvalley/water issues/water quality certificatio n/
Waste Discharge Requirements - Discharges to Waters of the State If USACE determines that only non-jurisdictional waters of the State (i.e., "nonfederal" waters of the State) are present in the proposed project area, the proposed project may require a Waste Discharge Requirement (WDR) permit to be issued by Central Valley Water Board. Under the California Porter-Cologne Water Quality Control Act, discharges to all waters of the State, including all wetlands and other waters of the State including, but not limited to, isolated wetlands, are subject to State regulation. For more information on the Waste Discharges to Surface Water NPDES Program and WDR processes, visit the Central Valley Water Board website at:https://www.waterboards.ca.gov/centralvalley/water issues/waste to surface wat er/
Projects involving excavation or fill activities impacting less than 0.2 acre or 400 linear feet of non-jurisdictional waters of the state and projects involving dredging activities impacting less than 50 cubic yards of non-jurisdictional waters of the state may be eligible for coverage under the State Water Resources Control Board Water Quality Order No. 2004-0004-DWQ (General Order 2004-0004). For more information on the General Order 2004-0004, visit the State Water Resources Control Board website at:
https://www.waterboards.ca.gov/board decisions/adopted orders/water guality/200 4/wgo/wqo2004-0004. pdf
Dewatering Permit
If the proposed project includes construction or groundwater dewatering to be discharged to land, the proponent may apply for coverage under State Water Board General Water Quality Order (Low Threat General Order) 2003-0003 or the Central Valley Water Board's Waiver of Report of Waste Discharge and Waste Discharge Requirements (Low Threat Waiver) RS-2018-0085. Small temporary construction dewatering projects are projects that discharge groundwater to land from excavation activities or dewatering of underground utility vaults. Dischargers seeking coverage under the General Order or Waiver must file a Notice of Intent with the Central Valley Water Board prior to beginning discharge.

For more information regarding the Low Threat General Order and the application process, visit the Central Valley Water Board website at:
http://www. waterboards. ca. gov/board decisions/adopted orders/water qua lity/2003/ wqo/wqo2003-0003. pdf

8.1.b
Packet Pg. 146 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) AT&T Wireless TowerCommunity Center Project
Stanislaus County
-4- 31 July 2023
For more information regarding the Low Threat Waiver and the application process, visit the Central Valley Water Board website at:
https://www.waterboards.ca.gov/centralvalley/board decisions/adopted orders/waiv ers/r5-2018-0085. pdf
Limited Threat General NPDES Permit
If the proposed project includes construction dewatering and it is necessary to discharge the groundwater to waters of the United States, the proposed project will require coverage under a National Pollutant Discharge Elimination System (NPDES) permit. Dewatering discharges are typically considered a low or limited threat to water quality and may be covered under the General Order for Limited Threat Discharges to Surface Water (Limited Threat General Order). A complete Notice of Intent must be submitted to the Central Valley Water Board to obtain coverage under the Limited Threat General Order. For more information regarding the Limited Threat General Order and the application process, visit the Central Valley Water Board website at:
https://www. wate rboa rd s. ca. gov /central valley/boa rd decisions/ad opted orders/gene ral orders/rS-2016-0076-01.pdf
NPDES Permit
If the proposed project discharges waste that could affect the quality of surface waters of the State, other than into a community sewer system, the proposed project will require coverage under a National Pollutant Discharge Elimination System (NPDES) permit. A complete Report of Waste Discharge must be submitted with the Central Valley Water Board to obtain a NPDES Permit. For more information regarding the NPDES Permit and the application process, visit the Central Valley Water Board website at: https://www.waterboards.ca.gov/centralvalley/help/permit/ If you have questions regarding these comments, please contact me at (916) 464-4684 or [email protected].
/Jlltu~
Peter Minkel
Engineering Geologist
cc: State Clearinghouse unit, Governor's Office of Planning and Research, Sacramento

8.1.b
Packet Pg. 147 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.)

PUBLIC NOTICE

THE CITY OF PATTERSON PLANNING COMMISSION

REGULAR MEETING
NOTICE IS HEREBY GIVEN that the City of Patterson (“City”) Planning Commission will hold a Regular Meeting on Thursday, September 14, 2023, at 7:00 p.m., in person AND via video conferencing and Zoom teleconference, to consider the following:

Public Hearing: AT&T Wireless Tower – Conditional Use Permit #23-01, Community Center, Negative Declaration #23-01, APN#021-070-002
Consideration of a Conditional use permit for an unmanned wireless tower facility (cell tower) located on the north side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive and to consider adopting a negative declaration for the construction and operation of an unmanned wireless facility, consisting of an 84.9’ tall decorative bell tower, an 8’x8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the Public/Quasi-Public zone.

NOTICE: THIS MEETING WILL BE PHYSICALLY OPEN TO THE PUBLIC. ALL MEMBERS OF THE PUBLIC

MAY ALSO PARTICIPATE IN THE MEETING VIA VIDEO CONFERENCING AND ZOOM TELECONFERENCE BY CALLING 1-669-900-6833, MEETING ID: 701-906-1477, PASSWORD: 20995363 AND WILL BE GIVEN THE OPPORTUNITY TO PROVIDE PUBLIC COMMENT. JOIN FROM A PC, MAC, IPAD, IPHONE, OR ANDROID DEVICE BY USING THIS URL:
https://us06web.zoom.us/j/7019061477?pwd=VEIrMTlYdmNZTk53ZitzZUdSZUQxZz09 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Planning Department at (209) 895-8020. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. [28 CFR 35.102-

35.104 ADA Title II]. The Planning Commission agenda and supporting public documents are available for viewing in City Hall, Planning Department, 1 Plaza, 2nd Floor, Patterson, California, during normal business hours. The Planning Commission agenda and supporting public documents are also available online on the City web site www.ci.patterson.ca.us listed under Agenda Center “Planning Commission” At the above noted time and place, testimony from interested persons will be heard by the Planning Commission and duly considered prior to making a recommendation. Any material submitted to the Planning Commission for consideration (photographs, petitions, letters, etc.) will be retained by the City and cannot be returned. If a challenge to the above application is made in court, persons may be limited to raising only those issues they or someone else raised at the Public Hearing.

Lisa Ochoa, Administrative Assistant II, Community Development Department

8.1.b
Packet Pg. 148 Attachment: 9-28-23_PC_Report_for_CC_Mtg (Enter into an agreement between the City of Patterson and New Cingular Wireless PCS, LLC.) City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwin, City Manager
BY: Bryan Stice, Community Development Director
MEETING DATE: November 7, 2023
ITEM NO: 8.2
SUBJECT: Approve the CEQA Addendum to the 2010 General Plan EIR for the Parks and Recreation Master Plan (PRMP) and adopt the Parks and Recreation Master Plan.

RECOMMENDATION
Motion to Approve the CEQA Addendum to the 2010 General Plan EIR for the Parks and Recreation Master Plan (PRMP) and adopt the Parks and Recreation Master Plan.

BACKGROUND
In 2011, the City embarked on a process of updating existing Master Plans and creation of new Master Plans that would help guide how and where necessary facilities could be built in response to planned future growth. These master plans would address public safety, parks and recreation, roadways and circulation, water, wastewater and storm drainage. If the General Plan can be considered the bones of the city, providing a framework for how the city should develop, the master plans add a muscular system, which provides more definition to their respective subjects.

The master plans were undertaken concurrently, so that - as much as possible - each plan could be integrated with the others. For instance, the bicycle and pedestrian system was based, in part, upon information from both the Transportation Infrastructure Master Plan and the PRMP to ensure that individuals and families would be able to use that system to access key locations throughout the city, including public recreation venues.

Around 2015, as the master plans neared completion, two changes occurred: First, the City Council directed staff to more closely scrutinize the master plans to ensure the recommendations were fiscally responsible and reasonable; and second, a series of laws were passed at the state level that required some changes to the master plans, particularly related to water issues, but that had impacts on other master plans. During the intervening period, staff and consultants have

8.2 Packet Pg. 149
worked to address issues presented by a continually shifting State legal landscape.

The City’s consultant on the PRMP, Gates and Associates, have completed work on the draft of the Master Plan. The Master Plan is now complete and ready for adoption by City Council.

On September 8, 2022, the Planning Commission recommended approval of the master plan to the City Council with a 4-0 vote.

ANALYSIS
The PRMP serves as a long-term vision to guide the future of the City’s park system and provides standards and policies to direct day-to-day decisions.

Specifically, the PRMP provides:
· background and context for evaluating the existing parks system; · an inventory of existing parks and recreation facilities and programs; · an analysis of the appropriate standards that will meet the needs of the current and future population;
· recommendations for improving and maintaining the existing park system; · recommendations for acquiring or obtaining access to additional properties for future park uses;
· a strategy for addressing recreation needs, as well as managing and maintaining recreational facilities;
· an approach for implementation of improvements and long-term maintenance; and · a record of the community involvement in developing the plan.

8.2 Packet Pg. 150

PARKS AND RECRE ATION MA STER P LAN

CITY OF PATTERSON
ADMIN DRAFT 2022

8.2.a
Packet Pg. 151 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 152 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON iii

PARKS AND RECREATION MASTER PLAN

TABLE OF CONTENTS

TABLE OF CONTENTS
1 INTRODUCTION ............................................................................... 3

1.1 PURPOSE OF DOCUMENT .................................................................. 3

1.2 ROLE OF PARKS & RECREATION .......................................................... 4

1.3 REPORT SUMMARY ............................................................................. 4 2 CONTEXT ....................................................................................... 9

2.1 ROLE OF PARKS AND RECREATION ..................................................... 9

2.2 PHYSICAL SETTING ............................................................................ 10

2.3 DEMOGRAPHICS ................................................................................ 11

2.4 RECREATION TRENDS ........................................................................ 14

2.5 PLANNING CONTEXT ........................................................................ 24 3 INVENTORY ...................................................................................... 29

3.1 EXISTING PARKS ................................................................................ 29

3.2 EXISTING COMMUNITY FACILITIES ..................................................... 65

3.3 EXISTING PROGRAMS ......................................................................... 69 4 NEEDS ASSESSMENT .......................................................................... 75

4.1 COMMUNITY PARTICIPATION ............................................................. 75

4.2 BENCHMARKING ................................................................................ 79

4.3 COMMUNITY ACCESS STUDY ............................................................. 80

4.4 CURRENT NEEDS AND DEFICIENCIES ................................................. 81

5. RECOMMENDATIONS ...................................................................... 85

5.1 PARK TYPES ....................................................................................... 85

5.2 PARK ACREAGE AND SERVICE AREA STANDARDS ................................. 86

5.3 SPORTS FIELD STANDARDS ................................................................. 89

5.4 COMMUNITY PARKS AT BUILD-OUT ................................................... 92

5.5 COMMUNITY FACILITY STANDARDS ................................................... 108

5.6 FACILITIES AT BUILD-OUT ................................................................. 109 6 GUIDELINES .................................................................................... 115

6.1 GENERAL PARK DESIGN GUIDELINES .................................................. 115

6.2 NEIGHBORHOOD PARKS..................................................................... 116

6.3 COMMUNITY PARKS ........................................................................... 119

6.4 SUSTAINABILITY ................................................................................ 121

6.5 JOINT USE DETENTION BASINS/ RECREATION FACILITIES ................... 123

6.6 DOG PARKS........................................................................................ 124

6.7 SAFETY AND SECURITY ...................................................................... 124

6.8 ACCESS ............................................................................................. 127 7 IMPLEMENTATION ............................................................................ 131

7.1 NEXT STEPS: ..................................................................................... 131

7.2 COST RECOVERY AND SUBSIDY ANALYSIS ........................................... 137

7.3 GENERAL FUND ................................................................................. 139

7.4 SPECIAL FINANCING DISTRICTS (SFD) ................................................ 140

7.5 GENERAL OBLIGATION BOND ............................................................ 141

7.6 FEES AND CHARGES ........................................................................... 142

7.7 DEVELOPMENT RELATED FINANCING ................................................. 143

7.8 PARTNERSHIPS ................................................................................... 144

7.9 GRANTS ............................................................................................. 146

7.10 OTHER FUNDING SOURCES .............................................................. 147

7.11 PLANNING LEVEL SUMMARY OF COSTS AND FEES ............................. 148 APPENDICES ......................................................................................... 153 APPENDIX A - COMMUNITY OUTREACH (2021) ......................................... 155 APPENDIX B - BENCHMARKING STUDY DATA COLLECTION....................... 197 APPENDIX C - REPORT: ACCESS TO RECREATIONAL OPEN SPACE ............. 199 APPENDIX D - PRIVATE SECTOR PARTNERSHIP STRATEGIES ....................... 211 2022 DRAFT

8.2.a
Packet Pg. 153 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

TABLE OF TABLES
TABLE 5-1: PARK ACREAGE STANDARDS AND CURRENT DEFICITS .............. 86 TABLE 5-2: PARK STANDARDS BY TYPE ...................................................... 87 TABLE 5-3: COMPARATIVE FIELD STANDARDS (2012).................................. 89 TABLE 5-4: RECTANGLE FIELD STANDARDS ............................................... 90 TABLE 5-5: DIAMOND FIELD STANDARDS .................................................. 91 TABLE 5-6: GAME FIELD STANDARDS ......................................................... 91 TABLE 7-1: RECREATION AND PARK FEES .................................................. 142 TABLE 7-1: RECREATION AND PARK FEES (CONT.) ..................................... 143 TABLE 7-2: PARK DEFICIENCIES AND FUTURE NEEDS ................................ 149 TABLE 7-3: DEVELOPMENT FEES PER UNIT TYPE ....................................... 150 TABLE 7-4: PLANNING LEVEL PARK COSTS ................................................ 151

8.2.a
Packet Pg. 154 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON v

PARKS AND RECREATION MASTER PLAN

ACKNOWLEDGEMENTS

ACKNOWLEDGEMENTS
City of Patterson Staff
Juliene Flanders, Recreation and Community Services Director Adrienne Chaney, Recreation and Community Services (former) Ken Irwin, City Manager
Michael Willett, Director of Public Works
Robert Andrade, Deputy Director of Public Works
Ronnie Tafoya, Facility Maintenance Supervisor
Patterson City Council
Dennis McCord, Mayor
Deborah Novelli, Mayor (former)
Alfred Parham
Dominic Farinha
Cynthia Homen
Shivaugn Alves
Annette Smith (former)
Joshua Naranjo (former)
Luis I. Molina (former)
Larry Buehner (former)
Parks, Recreation & Beautification Commission
Paula Obledo
Carolyn Cooper
Alexandria Tyler
Karina J. Contreras
Richard Reiller
Parks and Recreation Master Plan Steering Committee
Albertina Reynoso
Bruce Kelley
Donna Miller
Elias Funez
Karen Willard
Mario Maese
Patty Garcia
Shawn Posey
Tori Scoles
PJUSD
Phil Alfano, Superintendant
Steve Menge, Facilities
Prepared by:

Gates + Associates
The Sports Management Group
with additional material provided by
Leanne Lynch
2022 DRAFT

8.2.a
Packet Pg. 155 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for This page intentionally left blank

8.2.a
Packet Pg. 156 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

1. INTRODUCTION

8.2.a
Packet Pg. 157 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 158 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 3
1 INTRODUCTION

PARKS AND RECREATION MASTER PLAN
1 INTRODUCTION

1.1 PURPOSE OF DOCUMENT
The City of Patterson undertook a coordinated planning effort in 2012 to ensure that it provides adequate infrastructure for its current and future residents, visitors, and employees. This Parks and Recreation Master Plan was initiated as part of that coordinated effort in 2012, which also included the General Plan, Transportation Infrastructure Master Plan, and an update to the Zoning Code, among others. The final draft of the Parks and Recreation Master Plan was created and available for public review, but the adoption process was placed on hold while the other plans in the coordinated efforts begun in 2012 were finalized and adopted. Now, in 2021/2022, the Parks and Recreation Master Plan is refreshed for adoption.

The Parks and Recreation Master Plan lays out the City’s vision for the future of its parks and recreation facilities. As a strategic document, it studies the existing park system and facilities, and identifies a planning blueprint to expand, improve and protect the City’s network of parks and facilities as the City continues to grow.

The Parks and Recreation Master Plan process is similar to many strategic plan processes: the context is analyzed, demographic analysis is conducted, an inventory of resources is generated, community input and guidance is solicited, a needs assessment is performed, standards are proposed, goals and recommendations result, and an implementation plan is adopted. This plan builds on itself, section by section, with each chapter using the previous chapter(s) information to define steps required to address issues identified.

The Parks and Recreation Master Plan provides:
• background and context for evaluating the existing parks system; • an inventory of existing parks and recreation facilities and programs; • an analysis of the appropriate standards that will meet the needs of the current and future population;
• recommendations for improving and maintaining the existing park system;
• recommendations for acquiring or obtaining access to additional properties for future park uses;
2022 DRAFT

8.2.a
Packet Pg. 159 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 4 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
1 INTRODUCTION
• a strategy for addressing recreation needs, as well as managing and maintaining recreational facilities;
• an approach for implementation of improvements and long term maintenance; and
• a record of the community involvement in developing the plan.

The Parks and Recreation Master Plan provides both a long-term vision for the City’s park system, and specific policies and standards to direct day-to-day decisions. It sets forth a framework that will allow the City to respond to new opportunities as they arise, and to ensure that new development provides adequate parks and recreation facilities to meet the needs of Patterson’s current and future residents.

1.2 ROLE OF PARKS & RECREATION
As stated in the City of Patterson’s 2010 General Plan, “Parks, recreation, and cultural resources are essential components of any community. ... Access to such spaces is vital for every segment of Patterson’s population.”
Parks meet the diverse recreational needs of the community. They promote health and wellness at a time when lifestyles are tending to become more sedentary. They help people deal with the stress of daily living, and support positive social interactions. The Recreation and Community Services Department provides programs that focus on health and wellness for everyone, enbodied in its theme “Live Active.” A high quality park system provides economic benefits. It enhances community character and identity, creating a more attractive place to live, work and visit. This, in turn, raises property values, attracts quality employers, and generates revenues for local businesses.

1.3 REPORT SUMMARY

1. Introduction
This chapter gives a brief overview of the purpose and value of the Master Plan process, and a summary of the document.

2. Context
This chapter discusses the role of parks and recreation in a community.

It also discusses the factors which influence the vision and priorities addressed in the Master Plan. The chapter describes the physical set2022 DRAFT

8.2.a
Packet Pg. 160 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 5
1 INTRODUCTION

PARKS AND RECREATION MASTER PLAN
ting in which the park system is being planned, as well as the demographics of the Patterson community. It discusses current trends in park use, recreation programming, and attitudes towards parks and recreation. It also reviews the Park and Recreation Master Plan’s relationship to other City planning documents and policies.

3. Inventory
This chapter surveys the existing parks, facilities and programs currently found in Patterson. It describes each of the existing parks and facilities, and programs and services offered. This is the baseline on which future planning builds.

4. Needs Assessment
This chapter reviews the process used to analyze the Patterson community’s needs and priorities, now and in the future. It describes the extensive community participation in the development of the plan, as well as benchmarking and survey information that informed the Master Plan. It summarizes some of the immediate needs and deficiencies.

5. Recommendations
This chapter sets out the goals, standards, and recommendations for Patterson’s Parks and Recreation system. It addresses acreage and access standards, sports field and facility standards, and considerations regarding locations and components of future community parks and community serving facilities.

6. Guidelines
This chapter sets out guidelines to direct the design and construction of future neighborhood and community parks. It gives guidance regarding design and programming, sustainability, safety and security, and dual use of stormwater facilities.

7. Implementation
This chapter includes an approach for assessing City priorities for park and recreation expenditures. It further discusses options for financing park and facility improvements, and summarizes projected park and facilities costs at Patterson’s future build out.

Appendices
• Benchmarking study data collection
• Patterson parks access study report
2022 DRAFT

8.2.a
Packet Pg. 161 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 6 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
1 INTRODUCTION
This page intentionally left blank
2022 DRAFT

8.2.a
Packet Pg. 162 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

2. CONTEXT

8.2.a
Packet Pg. 163 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 164 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 9
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
To plan a park and recreation system that will best meet the needs of current and future residents of Patterson, one must understand the context - the climate and physical setting, the current and projected demographics, other planning efforts that affect the Parks and Recreation Master Plan, and evolving trends in the way people use parks and what they expect from their parks and recreation system.

The City of Patterson is a general law city located in Stanislaus County with a population of approximately 23,000 residents. The city has experienced significant growth and projects a population of 66,000 at buildout in 2050. Patterson is committed to the strategic and financially sustainable development of the city, and has thus embarked on their first Parks and Recreation Master Plan. A key objective of the Plan is to guide the development of parks, athletic fields, and community facilities so that the Recreation and Community Service Department can achieve health and wellness for the Patterson community.

Recreation and Community
Services Department Mission
Statement:
• Strives to deliver quality
programs for all generations,
by creating memorable experiences, a sense of community, and encouraging a Healthy,
Active Life.

2.1 ROLE OF PARKS AND RECREATION
The community benefits of parks and recreation are well documented and widely accepted. These benefits include:

Personal Benefits
Parks and recreation foster social, intellectual, physical and emotional development in children, youth, adults and seniors. They improve health and well-being by providing places and programs that support active living and positive lifestyle choices. Remaining healthy and active can lower a family’s medical costs. The types of activities supported by parks and recreation improve the quality of life. Parks Make Life Better!
Social Benefits
A park and recreation system that is well thought out, well maintained and well-used, strengthens community image and sense of place. It enhances community identity and increases community pride. It both promotes cultural unity and celebrates diversity. Engaging in healthy recreation reduces alienation, loneliness, and anti-social behavior, and contributes to building strong families. Parks also play a major role in protecting environmental resources.

Economic Benefits
A good park and recreation system has proven economic benefits. It helps to attract and retain businesses and residents, becoming a tool 2022 DRAFT

8.2.a
Packet Pg. 165 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 10 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
for business development. It creates a more productive work force with fewer days of sick leave. Great parks and successful recreation programs also attract visitors and tourists, which contribute to the local economy. A sports complex or performing arts center is a destination inviting regional use and bringing patrons to local businesses. A successful park system improves and sustains property value. Well used parks have been shown to reduce vandalism, thus saving public maintenance funds.

Parks and recreation play an important role in creating and sustaining the quality of life the community. The implementation of the Master Plan will ensure that parks and facilities are available and accessible to all community members. The Plan creates opportunities for physical, social, and artistic activities that are enjoyable, promote confidence, and encourage interaction between community members, friends, peers, and parents.

2.2 PHYSICAL SETTING
The City of Patterson is located in the western San Joaquin Valley, in a fertile agricultural area between the Diablo Range to the west and the San Joaquin River to the east. The city is surrounded by agricultural lands, including orchards, row crops and fields. The Delta Mendota Canal and the California Aqueduct run along the western edge of the city, and irrigation laterals cross the area.

For the most part, Patterson’s topography is relatively flat. The Diablo Range rises to the west, and a portion of the lower foothills is within the General Plan area. Del Puerto Creek, which runs from the foothills along the northern edge of the General Plan area, provides wildlife habitat. The Salado Creek corridor, which flows generally northsouth through the city, provides an open space connection through residential neighborhoods. Stormwater is managed through the use of detention basins, which are often incorporated into neighborhood parks and water features. East of the city limits, the San Joaquin River is both an element of the city’s identity, and a potential recreational and habitat amenity.

Patterson enjoys warm spring and fall weather, hot summers, and relatively cool winters. With an average of 12 inches of annual rainfall, outdoor activity is possible throughout the year. Given the average 2022 DRAFT

8.2.a
Packet Pg. 166 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 11
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
high temperatures in the upper 90’s during the summer months, shade provided by a mature tree canopy or structures is important for the health and safety of park users.

2.3 DEMOGRAPHICS
The City of Patterson has embarked on this Parks and Recreation Master Plan as a strategic planning tool to ensure the residents’ vision for the community is documented and a course developed to achieve the plan. Demographic analysis assists in identifying the characteristics of the population residing with the City of Patterson and how those factors may affect the Parks and Recreation program, parks, and facility needs. This analysis also aids in understanding how the local demographics are either similar or different from state and national trends.

Population Forecast
The population of Patterson rose most precipitously from 2000 to 2010, increasing over 75%. The decade prior, 1990 to 2000, the population had significantly increased by 32.2%. Since 2010, the population growth has slowed, with the City population increasing 16.5% to 23,781 residents in the 2020 Census. Stanislaus County projects Patterson to increase to 41,465 residents by 2042, a rate twice that of growth over the last decade (2018 Regional Transportation Plan).

Age Distribution
A profile of the population’s age provides important information to assist in parks and recreation programming since different age groups have different requirements, needs, and desires for their participation with parks and recreation facilities.

According to the 2019 5-year American Community Survey estimates, Patterson’s median age is 31.1, compared to California’s 36.5. Youth under 18 years of age comprise 29.6% of the population, compared with 22.5% in California as a whole. Worthy to note that about half of those were youth ages 9 and under (17.5%). The next largest age group is the Family Forming Adults (27.4%) ages 25 – 44 years. These percentages have remained consistent since the 2000 Census, and reflect the family oriented character of Patterson.

Although the total population of the City of Patterson is not expected to change significantly over the next few years, the need for park and 2022 DRAFT

8.2.a
Packet Pg. 167 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 12 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
recreation amenities will remain in demand with the high percentage of young age groups and potential family forming segments that typically rely on community recreation for their leisure services. This is a result of the influx of growth in the community over the past two decades from families relocating to take advantage of Patterson’s affordable housing opportunities. Since the majority of the population is newer residents, there does not appear to be a dramatic shift in older age segments of the population as evidenced in older established communities. In addition, according to the State of California Recreation Trends Report, 2005, California’s 18–40 year-old young adults are creating new ways to experience the great outdoors. The City of Patterson has embraced this trend with the surrounding natural amenities available to them.

Patterson has a large percentage of school age youth, from 5-17 years of age. This is the group targeted for the after school, youth sport programs, aquatics, and teen club programs. There will continue to be a demand for programming that targets this age group. This suggests a market and desire for after school and summer camp programs; recreational youth sport leagues and recreational activities, and spaces for family events and social gatherings.

Household Composition
There are currently 5,958 households in Patterson as reported in the 2019 ACS data. Of this number, 60.9 percent are considered family households. The number of Patterson family households is an indicator that there will be high interest and support for youth activities as well as activities and facilities that serve families.

In 2019, the percentage of families with children aged 17 and under below the poverty level and residing in the City of Patterson, was

25.7% (986). Patterson residents living at poverty level or below benefit from the subsidized programming and scholarships offered by the Recreation and Community Services Department, which directly contributes to the quality of community life.

Race/Ethnicity
Race and ethnicity play an important role in the population’s parks and recreation needs and desires. Trends can be found in the ways that different races/ethnic groups use parks and recreation facilities and the types of programming they seek. Patterson’s predominately Hispanic 2022 DRAFT

8.2.a
Packet Pg. 168 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 13
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
or Latino population (62.9% as of 2019) influences the way recreation and park services are supported and engaged. Recognizing the cultural heritage of those served by recreation and park providers assists in addressing their particular cultural needs and desires. This presents opportunities to offer a variety of parks and recreation programs that celebrate the specific interests and cultures of its residents.

Education and Income
Research indicates that a person’s physical activity level is determined by a number of factors, including education, income, and gender. In Patterson, for those 25 years of age or older, 73.6% of the population are high school graduates or higher. According to The Hispanic Community and Outdoor Recreation Study (UCLA 2006), “There appears to be some correlation between different education levels, sex, and household size when measuring the level of physical activity amongst Hispanics. Hispanics with the highest education levels appear to be the most active”. Demographic findings indicate that education will need to be a primary focus of program offerings for the community center and will require marketing and community acceptance to encourage participation.

The education level is also reflected in the median household income of $69,233 with 21.9% in retail trade industries and 27.5% listed as unemployed or not in the labor force. This presents a challenge to the City of Patterson as to the cost recovery of program and activity offerings in relation to ability to pay. Community recreation or subsidized programming is a factor in the successful utilization of programs to this specific population group.

Travel Time to Work
The average travel time to work for a Patterson resident is approximately 44.5 minutes and over 81% drive alone. This suggests that the community’s mobile and leisure activities are pursued on weekends, and later in the day, after work and travel, resulting in a potential demand for after school and summer day programming that responds to this time frame.

Recreation and Parks as Community Builders
An important consideration for the City of Patterson is the number of foreign-born people living in the community. According to the Park and Recreation Trends in California 2005 report by the California State 2022 DRAFT

8.2.a
Packet Pg. 169 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 14 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
Parks Resources Agency, “a remarkable 37% of California’s foreignborn have arrived since 1990, making California a large and important center for recent immigrants. Many of these recent immigrants have limited experience with the ready availability of outdoor recreation and public lands”. The City of Patterson will be encouraged to develop ways to engage their culturally diverse population to become users of and advocates for parks and recreation services.

Research has also shown that the availability of opportunities to engage in physical activity is positively correlated with the amount of physical activity in which people engage. The availability of parks and recreation services are vital to increasing physical activity across all age groups and play an essential role in reducing obesity rates. When evaluating the availability of these opportunities, an important consideration is their accessibility and proximity to residents in addition to their existence. Physical barriers, safety concerns, and distance to parks and facilities can prevent residents from using the facilities and programs. Research has found that larger sizes of parks and open spaces do not increase the frequency or intensity of use, but rather the distance to the park or open space is the greatest deterring factor. In Patterson, the lack of transportation for youth and the dependency to travel by foot or bicycle hinders their ability to participate in planned activities. This is a challenge in developing recreation facilities, programs and parks, which are accessible to the youth in particular.

2.4 RECREATION TRENDS
State and national social, economic, and environmental trends will have an impact on the demand and the delivery of recreation services in the City of Patterson. Trend analysis is one forecasting tool to assist in determining the societal interest and potential use of amenities and services for recreation and leisure pursuits. According to Ruth V.

Russell in a report for Indiana State University, “Unrelenting financial problems, more federal and state requirements, enhanced demands for services to an aging population, program requirements catering to greater diversity of lifestyles, a shrinking and ethnically changing work force, stiffer competition for tax dollars, increasing violent crimes in parks, a movement toward privatization of operations, computerization, shrinking public images of the profession, and lack of citizen involvement are among the challenges now faced by public recreation and park agencies”.
2022 DRAFT

8.2.a
Packet Pg. 170 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 15
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
The population of Patterson double over the last twenty years (2000 to 2020). Many new residents have come from urban environments in search of a higher standard of living as well as a lower cost-of-living.

Some new residents have brought with them a few of the urban social ills they sought to leave. These newcomers require a good social outlet, and a place to encourage positive behavior. Preparing for this population growth and anticipating their preferences and culturally diverse needs are challenges facing the City of Patterson.

Top Ranked Trends Impacting Parks Departments
According to a report presented by Ruth V. Russell on Public Park and Recreation Trends, the following is a list of trend impacts on the parks and recreation profession:

EXTREME IMPACT

1. Deteriorating park and recreation infrastructure

2. Increasing crime (violence, drug use, vandalism, gangs) in communities and parks

3. Declining park and recreation budgets relative to costs

4. Increasing competition for shrinking federal, state, and local tax resources

5. Massive public sector debt

GREAT IMPACT

6. Neglect of children

7. Greater cultural diversity (growing and more influential minority populations)

8. Greater difficulty in providing equal opportunity for leisure to all people

9. Declining quality of life and livability of urban areas (insufficient open space, deteriorating city)

10. Greater division between “haves” and “have-nots”
The result of these impacts is an increased public demand for participation, accountability, and productivity in government. Parks and recreation services are being required to think in terms of sustainability, how to be competitive in the marketplace, and the application of business practices in their operational planning.
2022 DRAFT

8.2.a
Packet Pg. 171 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 16 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
The global pandemic increased public appreciation and demand for parks. Parks became a place of fresh air, peace, exercise, and meditation during and after the stay-at-home orders enacted in response to the crisis. A report by the Trust for Public Land identifies access to nature paramount in a time of stress overload. Parks saw a surge in visitors during the pandemic, as a respite and destination when so many other places were shuttered. Parks provide access to nature, recreation, and exercise, and green infrastructure was in the spotlight for the mental health benefits it provides. Continuing the positive momentum developed for parks during the pandemic should be utilized to betterment of the parks and recreation system.

Trends in Demographic Groups
• BABY BOOMERS
The aging of the population is having a tremendous impact at both a national and state level. Baby Boomers account for 17.9% of the population in 2019. Even though the population is “graying”, their needs are becoming more active, increasing demand for spaces and amenities to accommodate a greater variety of programming and active lifestyles.

They have a more positive concept of age as well as different fitness interests, retirement and work expectations, social connection desires, and health and wellness needs.

Many of today’s older adults will age in place. As baby boomers approach what was formerly retirement age, most do not plan to retire like the generations before them. A recent study found that 7 in 10 Americans plan to work following retirement from their career. This has a profound impact on the provision of senior services. The new multi-generational service model, rather than the traditional senior center, must be contemporary, active, service oriented, and dynamic in its offerings. These centers approach education, work, recreation, and leisure as lifelong activities, which span the entire continuum of adult life and no longer view retirement as a slowing down of active pursuits.

Over the last decade, California has experienced one of the fastest rates of increase in adult obesity of any state in the nation. AARP conducted a national survey of adults born in 1946. From this survey, researchers found that the area of their lives that 60 year-olds want to improve the most over the next five years is their physical health.

To increase their physical health, many will include exercise walking, 2022 DRAFT

8.2.a
Packet Pg. 172 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 17
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
as it has become the most popular activity for Americans over age

45. To facilitate this, City of Patterson should provide for fitness and recreation facilities and amenities for continued exercise and health to include the boomer generation.

Many of today’s boomers are part of the “sandwich generation,” providing some care for a parent and their own children. Forty-four percent of Americans between the ages of 45 and 55 have an aging parent(s) and children under the age of 21. The impact on recreation and aquatics has been the increased interest in programs and facilities that are designed to serve the needs and interests of children, adults, and older adults at a single location and often, simultaneously. • YOUTH
In recent years, the recognition of the youth obesity crisis in the United States has become widespread. In the past two decades, obesity rates have doubled in children (aged 6-11) and tripled in adolescents (aged 12-17). Currently, 40 percent of children in the United States over age six are overweight. Of these children, one in three born after the year 2000 will develop diabetes.

This trend is directly impacted by the loss of free time that children have. Over the past two decades, children have lost 12 hours of free time a week, including eight hours of unstructured play and outdoor activities. If current trends in obesity and physical inactivity continue, today’s youth will be the first generation in this nation’s history to face a shorter life expectancy than their parents.

In contrast, over the past two decades, participation in organized sports has doubled; however, sports participation does not ensure the necessary levels of physical activity required for health and physical fitness. There is a sharp reduction in casual play and a trend towards sport specialization and year round competition in a single sport and the growth of traveling competitive teams. This trend contributes to the pressure and lack of “fun” formerly associated with team sports.

Also, specialization excludes the less skilled players who then do not feel as adequate. Parks and recreation services can play a major role by offering sport programming which introduces a variety of sports within one program and sports that are not as competitive in nature.

Studies indicate that children and adolescents are more likely to become physically active and fit if they have a wide range of accessible, 2022 DRAFT

8.2.a
Packet Pg. 173 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 18 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
safe, and affordable recreation opportunities. The provision of youth and teen programs within the City of Patterson is critical to fighting childhood obesity and instilling healthy habits attributing to the wellness of the community’s youth and teens. • MILLENNIALS
The generation born between 1982 and 2000 are referred to as the Millennial Generation (also known as Generation Y or Echo Boomers) and are now between the ages of 21-39 years and number about 10 million in California. Millennials are the most educated of Americans, most ethnically diverse generation in U.S. history and possess the most disposable income. However, Millennials are “the only generation significantly less likely to agree that all people should be connected with nature” and “that it is important to be outside as much as possible.” The resulting factors are this generation is facing increased health and obesity risks, and are less connected with their natural environment and community. City of Patterson Recreation and Community Services Department should remain current with new tech tools, and programs need to be kept “fresh” and with a less competitive emphasis on the outcomes to maintain the interest of the Millennials.

Trends in Park & Facility Design
• COMMUNITY DESIGN
Cities throughout the state and the nation are working to address the issue of social alienation and physical inactivity through community design. As inactivity and social isolation increase, so does the incidence of obesity, heart disease, diabetes, depression, and mental illness. The trend for parks and recreation is toward making parks usable and vibrant social meeting places. “Project for Public Spaces has researched what attributes most social places share. We found that a good place provides a range of things to do (“uses and activities”); is easy to get to and connected to the surrounding community (“access”); is safe, clean, attractive (“comfort and image”); and, perhaps, most important, is a place to meet other people (“sociability”).”
Not only are park departments concerned with making parks social meeting places they are also responding to the demands of the rising sandwich generation and extended families by making parks multigenerational family destinations. No longer is a mother dropping her child off at the ball field. Today, a mother will join her child with 2022 DRAFT

8.2.a
Packet Pg. 174 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 19
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
perhaps a grandparent to enjoy park and recreational time while her child is near-by. This trend reiterates the need for parks to combine active and passive uses and provide for a variety of activities within close proximity of each other.
• ENVIRONMENTAL DESIGN
Parks and recreation departments have a long history of stewardship of the environment. Green building components can be included in almost any facility or park and they can have a significant impact on the cost to operate the facility. This trend toward environmental sensitivity in design can be accomplished by reclaiming land, preserving open space, acknowledging environmental principles, recycling water, conserving resources and using environmentally friendly “green” materials. Further, these components are not only environmentally responsible; they are economically beneficial. At the onset green materials, components and designs may seem financially prohibitive yet green has a significant impact on the cost to operate and maintain facilities and generally pays off over the life span of the project. When designing for new facilities City of Patterson should thoroughly consider the cost benefits of green and sustainable concepts and incorporate the best practices of environmental design and sustainability into their projects. • PARKS
According to a 2019 survey by Recreation Management, the top parks and open space features being planned for construction over the coming years are:
• Splash play areas
• Playgrounds
• Fitness trails and outdoor fitness equipment
• Synthetic turf sports fields
• Dog parks
• Park shelters
• Walking and hiking trails
• Park restrooms
This is reflective of the trend towards unstructured play, access to green spaces, and outdoor fitness. Linking parks together with green corridors and trails is a trend of community design that encourages people to come outside and “move about” the community encouraging 2022 DRAFT

8.2.a
Packet Pg. 175 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 20 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
socialization, fitness, and appreciation of the natural resources. • PLAYGROUNDS AND NATURE DEFICIT DISORDER
Playgrounds are the most common amenity found in parks. There is a growing trend toward “natural” play areas and use of the playground as a gateway to nature. In response to fitness and movement, playgrounds are being used to entice children outside and into their environment for play and spontaneous learning as well as developing an appreciation for the natural environment.
• AQUATICS
According to national surveys, swimming is second only to walking as the most popular form of exercise, with more than 368 million annual visits to swimming pools. A variety of surveys and studies provide evidence of the importance of swimming as a leisure activity. In response to this tremendous demand, aquatic facilities and programming have changed dramatically in recent years to better serve the public.

The family aquatic center responded to a need for increased and more varied programming and accessibility and decreased density. Features such as a zero-depth (beach) entry, water slides, leisure and activity areas, and interactive water play features provide the attraction for families. These features are critical to the annual participation and the financial success of the facility.
• Water Exercise
Not only is swimming popular but there is increasing demand for water exercise. Water exercise is reported to have a higher percentage of growth in participation than all other forms of water activity. With water supporting up to 90% of one’s body weight, persons of all ages and abilities can achieve movement in the water. Further, since exercises can be performed in shallow or deep water, it encourages nonswimmers to participate. • Splash Play
The addition of spraygrounds as park elements embodies the current approach toward accessibility, safety, innovation, and affordability.

According to Recreation Management magazine in their 2019 State of the Industry survey report, the top feature to be added to parks being developed is splash play areas. Installed over zero-depth pads, splash play features allow a place to have some fun in the sun and water without having to hire staff to keep a constant watch over the facility. 2022 DRAFT

8.2.a
Packet Pg. 176 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 21
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
Additional cost and maintenance considerations arise with installation of spraygrounds, due to requirements for restrooms and shower facilities if the sprayground water is recirculated. • CULTURAL DIVERSITY
Cultural diversity is an important factor as it influences the way segments of the population approaches recreation and leisure pursuits.

These groups will be growing participants in the offerings of Recreation and Community Services and in order to encourage their participation, the program offerings need to address their interests and needs.

Hispanics have identifiable recreational characteristics based in their culture, traditions and family relationships that are necessary to determine in the successful provision of facilities and programs. The Hispanic population values leisure, and 74 percent report that leisure time is spent mostly or exclusively with other Hispanics. Within the realm of “leisure,” casual, informal gathering of friends and family is the preferred activity. The influence of socialization plays a large part on the recreation experience, thus there is need to provide a variety of facilities for social gathering usage.

Another trend observed multiple places in the future’s literature is that a process of cultural homogenization is occurring. There is a growth of a national society. U.S. citizens travel more, we hear and see the same messages in the mass media, intermarriages are more frequent, and schools teach essentially the same thing across the country -- all this has a leveling influence.
• FITNESS
According to 2020 estimates from the Centers for Disease Control and Prevention (CDC), over 34 million Americans have diabetes, and over 88 million Americans have prediabetes. In a recent study, CDC projected that as many as 1 in 3 U.S. adults could have diabetes by 2050 if current trends continue. Parks and Recreation Departments can assist in reversing this trend by providing fitness amenities and alternatives for community members of all ages to partake in and support the fitness movement. The five most popular fitness activities in the U.S. are walking for fitness, treadmills, running/jogging, stretching, and hand weights. Providing opportunities for these types of activities, indoor and out, should be considered in park and facility design. 2022 DRAFT

8.2.a
Packet Pg. 177 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 22 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
Trends in Park & Recreation Programming
In recent years, overall trends have reflected a growing interest in and attention to lifelong health and fitness, programs accommodating all ages and abilities, multi-generational activities, and innovative and expansive concepts of recreation.
• HEALTH AND FITNESS
Park and recreation programs are taking a more active role in community health and fitness. Parks and recreation departments partner in programs such as ParksRX, where health providers and physicians prescribe outdoor fitness activities and time in nature for improved physical and mental health outcomes. They partner with Health Care agencies to incentivize active outdoor recreation with programs for children and families.

By offering programs that engage children in sports and activities that can remain enjoyable and continue as lifelong habits, parks and recreation departments provide a foundation for long term healthy living.

Sports such as tennis, soccer and basketball, as well as activities such as biking, hiking, and swimming can be an easily accessible source of enjoyable exercise throughout the adult years.

Parks and recreation departments are also focusing on health and fitness needs of specific demographics. “Mommy Fitness” exercise and wellness classes and activities, offered during pregnancy and toddlerraising years support the well-being the many Gen X and Gen Y women of child bearing age. Sport and fitness programming for active older adults engages that cohort who do not think of themselves as “Seniors.” Therapeutic recreation programming focusing on the health and wellness of our aging population is also expanding in creative ways, providing social settings for activities that improve strength, balance, and mobility. • INCLUSIVENESS & MULTI-GENERATIONAL ACTIVITIES
There has been an increasing awareness of providing programming that is appealing and accessible to people of all ages and abilities. Cities nationwide are facing the challenge of how to support families. This challenge includes creating parks and programs that address child development – physical, social and cognitive. Programs are being of2022 DRAFT

8.2.a
Packet Pg. 178 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 23
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
fered that allow children with all ranges of physical and mental abilities to fully participate. Recreation offerings must consider children of all ages and their families.

Teenagers are perhaps the most challenging of this group. As a whole, they do not want to be categorized with children, may not want to be part of an organized group, and are often more interested in exploring a larger realm. They often indicate a desire to”hang out,” and need safe places day and night to do this. Evaluating how to provide safe and enjoyable experiences for this group is paramount to fully serving the needs of residents.
• EXPANDING ROLE OF RECREATION
Park and recreation departments are expanding their offerings beyond their historic limits. Aside from traditional programs such as organized sports, recreation now includes educational enrichment programs, fine arts and performing arts focus, mind-body balance programs, “maker spaces” for creative tinkering and experimentation, and more. Recreation professionals are providing an ever widening range of experiences for participants.

Trends in the initiatives planned by recreation organizations reflect this expanding focus. The 2019 Recreation Survey identified the top initiatives that responding organizations are involved in:
• Wellness initiatives
• Inclusion initiatives for those with physical disabilities • Outreach to economically disadvantaged populations
• Outreach to underserved populations
• Inclusion initiatives for those with developmental disabilities • Outreach to minority populations
• Resource conservation and green initiatives
• Initiatives to connect people with nature
• Initiatives to reduce hunger/improve nutrition
• Disaster recovery assistance
Parks and recreation departments typically offer a diverse range of programming service to their communities, from preschool programs to trips for older adults. Creative programming and keeping things fresh make the difference between falling revenue and steady performance.

According to the 2019 Recreation Management survey, the most commonly planned program additions include:
2022 DRAFT

8.2.a
Packet Pg. 179 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 24 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
• Group exercise programs
• Fitness programs
• Educational programs
• Programs for active older adults
• Mind-body balance programs
• Teen programs
• Day camps and summer camps
• Holidays and other special events
• Environmental education
• Special needs programs
These categories resemble the typical list of program offerings from Recreation Departments. Combining the typical program offerings with new trends keeps community members interested and connected.

The creative spin on the program offerings, effective marketing, and keeping current on the preferences of community members will be the difference in successful programming in today’s competitive market.

2.5 PLANNING CONTEXT
2010 General Plan
The City of Patterson adopted its 2010 General Plan on November 30, 2010. This plan set forth a vision of Patterson’s future, recognizing the importance of parks and recreation. General Plan, Goal PR-1, in the Parks, Recreation and Cultural Resources Element is “To establish and maintain a public park system and recreation facilities suited to the needs of Patterson residents and visitors.” To this end, Policy PR-1.1 calls for the preparation and adoption of a Parks and Recreation Facilities Master Plan. The General Plan also sets a minimum standard of five acres of developed parkland per 1,000 residents.

Infrastructure Master Plans
The City has undertook master planning for a range of infrastructure needs including Public Safety, Circulation, Stormwater, Water and Wastewater in the early 2010s. The process of developing the Master Plans included collaboration between plans wherever appropriate to take advantage of synergies and to maximize the benefits of each plan.

Examples include design and planning of stormwater detention facilities to function as dual use parks to the extent possible, or co-location of community parks with fire stations to enhance public safety in the parks. The Circulation Master Plan includes Class I Bikeways, which 2022 DRAFT

8.2.a
Packet Pg. 180 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 25
2 CONTEXT

PARKS AND RECREATION MASTER PLAN
are critical to improve access to the community’s parks.

Patterson Community Design Guidelines
These guidelines include discussion of development adjacent to or crossed by a creek or stream. The guidelines describe setbacks and treatments intended to protect these valuable community resources as natural, scenic and recreational amenities
Existing Park Plans
The City has prepared master plans for the Patterson Sports Complex and for the Patterson Community Complex, Aquatic Center, and Centennial Park. Portions of these master plans have been completed. As a result of the input obtained during this Parks and Recreation Master Plan process, some changes are proposed to the current plans for these two facilities.

Americans with Disabilities Act Updates
Regulations and requirements for compliance with the Americans with Disabilities Act (ADA) have recently been updated. Many of Patterson’s existing facilities do not meet the revised standards. This impacts what may be considered “usable” in our inventory of parks and facilities.

Parks and Recreation Administration
In 2012, the Parks and Recreation Department was restructured. The park maintenance function and corresponding staff were transferred to the Public Works Department, and recreation functions remained within the re-named Recreation and Community Services Department.

The Director and a staff consisting of one full-time Recreation Administrative Services Manager, three full time Recreation Supervisors, one full-time maintenance/facility supervisor, two full-time account clerks, one full-time administrative assistant, numerous part-time maintenance staff and many part-time recreation leaders comprise the existing Department. A Parks, Recreation & Beautification Commission of five members provide valuable citizen input to the department’s management. They will play an important role in assisting to define the department and providing input on policies and procedures.

Master plan goals provided by staff include:
• Develop a plan which would guide the future development of the 2022 DRAFT

8.2.a
Packet Pg. 181 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 26 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
2 CONTEXT
City
• Incorporate sustainable development practices for parks and recreation • Define the role of recreation and community services in the quest for providing excellence in recreation services
• Create a sense of place and identity
Strengthening partnerships will be an important avenue in providing community recreation services now and in the future. This can be accomplished through focusing on community partnerships and co-sponsorships with providers, and providing space for self-directed programming. Development of policies and procedures to guide decisions and provide structure for the future will be important next steps.

City of Patterson Strategic Plan (2017-2021)
The five-year plan, prepared in late 2016, was collaboratively developed through a six-month process with City leadership, staff, city council members and public meetings. The plan provides overarching goals and strategic directions for the following four sectors:
• Community & economic development
• Community livability & quality of life
• Government programs & services
• Infrastructure & built environment
The plan is written more as a high-level framework document, identifying initial action items and performance measures within each category to gauge positive impact for the City. The goals in this plan should be considered in all planning efforts.
2022 DRAFT

8.2.a
Packet Pg. 182 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

3. INVENTORY

8.2.a
Packet Pg. 183 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 184 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 29
3 INVENTORY
This chapter describes the inventory of parks, facilities and programs that exist in the City of Patterson as of 2021.

3.1 EXISTING PARKS
The City of Patterson currently has 34 parks, ranging in size from a fraction of an acre to 12 developed acres. Most of the existing parks are less than 4 acres, and serve their surrounding neighborhoods. Twenty parks serve a dual function as detention basins for stormwater, and thus have periods during the year when all or a portion of the park is unusable for recreation purposes. Overall, including community facility sites, detention basin parks and undeveloped park property, there are 98 acres of parks and facilities in Patterson.

This is approximately 4.6 acres per 1,000 residents. The following section describes each park, listing the location and size of each, its features and amenities, whether it is a detention basin, the source of its maintenance funding, and additional comments and observations. At this time, the detention basin areas of the existing parks do not meet current ADA accessibility standards due to the steepness of their side slopes. 2022 DRAFT

8.2.a
Packet Pg. 185 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
30 CITY OF PATTERSON

AMARYLISS PARK
S. AMERICAN EAGLE
AVE. @ SPERRY AVE.

0.83 ACRE
Playground: No
Picnic: None
Sports Fields: None
Sports Courts: None
Other Features: None
Basin: No
Maintenance: Patterson Gardens LMD
Comments:

This undeveloped roadway easement is the site of a future xeriscape garden demonstrating the use of drought tolerant plants. It will also be the site of a future community garden.

N
2022 DRAFT

8.2.a
Packet Pg. 186 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 31

AMBERCOT PARK
CREEKSIDE DR. &
ALPINE CREEK DR.

4.07 ACRES
Playground: Yes
Picnic: Shelter & Tables
Sports Fields: Soccer practice on multi-use turf area (not ADA accessible)
Sports Courts: None
Other Features: Open Lawn, Restrooms
Basin: Yes
Maintenance: Walker Ranch LMD
Comments:

Ambercot Park is across from Creekside Middle School, adjacent to Salado Creek. There is good access from the school, and good bicycle and pedestrian access from the Salado Creek Trail. There are plans for an improved pedestrian path connecting to Salado Creek. Graffiti and vandalism are problems in this park due to poor visibility - homes do not face the park. Additional shaded picnic areas would improve usability. The basin area is not compliant with current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 187 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
32 CITY OF PATTERSON

APRIGOLD PARK
HACKNEY ST. @

NEW FOREST WAY

3.89 ACRES
Playground: Yes
Picnic: Shelter & Tables
Sports Fields: Soccer and baseball practice on multi-use field with backstop (not ADA accessible)
Sports Courts: None
Other Features: Open Lawn, Shade Trees
Basin: Yes
Maintenance: Walker Ranch LMD
Comments:

Aprigold Park is adjacent to Salado Creek, near Creekside Middle School. There is good bicycle and pedestrian access from the Salado Creek Trail. The multi-use field is large enough for soccer and baseball practice. There are shaded picnic tables. The basin area is not compliant with current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 188 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 33

AURORA PARK
ROADRUNNER DR. @
CLIFF SWALLOW DR.

0.55 ACRE
Playground: No
Picnic: Tables
Sports Fields: None
Sports Courts: None
Other Features: Open Lawn
Basin: Yes
Maintenance: Heartland Ranch LMD
Comments:

Aurora Park is a very small basin park. The turf area does not accommodate active sports. This park could be suitable for a dog park. It backs onto undeveloped agricultural land and the Patterson Irrigation District lateral, which may provide good trail access in the future.

The basin area, which comprises most of the park, is not considered accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 189 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
34 CITY OF PATTERSON

AUTUMN ROYAL PARK

HEARTLAND RANCH
AVE. @ PEREGRINE DR.

2.40 ACRES
Playground: Yes (2-5 yr)
Picnic: Shelter, BBQ & Tables
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: ½ Basketball (small)
Other Features: Open Lawn, Shade Trees
Basin: Yes
Maintenance: Heartland Ranch LMD
Comments:

Most homes back onto this park, which is not well-configured to accommodate active uses. The basketball half-court is quite undersized.

The triangular shape creates unusable, leftover space. The picnic shelter needs to be replaced. The basin area is not compliant with current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 190 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 35

BLENHEIM PARK
AMERICAN EAGLE AVE.
@ PIPIT DR.

1.25 ACRES
Playground: Yes
Picnic: Shelter & Tables
Sports Fields: None
Sports Courts: None
Other Features: Open Lawn
Basin: No
Maintenance: Heartland Ranch LMD
Comments:

Blenheim Park is small and narrow, with little space to support active sports use. It is one of several parks located along the Salado Creek corridor, thus accessible to pedestrians and bicyclists, although it is on the opposite side of American Eagle Avenue from Salado Creek.

N
2022 DRAFT

8.2.a
Packet Pg. 191 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
36 CITY OF PATTERSON

BLUE FIESTA PARK
HYACINTH DR. @
BELLA FLORA DR.

0.50 ACRE
Playground: Water Spray Play Area
Picnic: Shelter & Tables
Sports Fields: None
Sports Courts: None
Other Features: Water Spray Play Area, Covered Shelters, Open Lawn Basin: No
Maintenance: Patterson Gardens LMD
Comments:

Blue Fiesta Park is a small but well-used park. The water spray play area - the only one in Patterson - is very popular among residents and day care providers. The water does not recirculate, and the surfacing will be replaced. Lighting in the park has reduced vandalism.

The park backs onto a West Stanislaus Irrigation District lateral and agricultural land, and could be expanded when the adjacent land is developed. The lateral could provide future trail access.

N
2022 DRAFT

8.2.a
Packet Pg. 192 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 37

CAMAS LILY PARK
S. AMERICAN EAGLE
AVE. @ SPERRY AVE.

2.56 ACRES
Playground: No
Picnic: Shelter & Tables
Sports Fields: Soccer practice on multi-use turf
Sports Courts: None
Other Features: Open Lawn
Basin: Yes
Maintenance: Patterson Gardens LMD
Comments:

The multi-use turf at Camas Lily Park is large enough for practice soccer. The detention basin in this park is at the bottom of a drainage chain, staying wet longer than other areas. From this basin, water is pumped to Salado Creek. The basin area is not accessible under current ADA regulations. The park is along the Salado Creek corridor, although on the opposite side of American Eagle Avenue from the future trail.

N
2022 DRAFT

8.2.a
Packet Pg. 193 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
38 CITY OF PATTERSON

CASTLEBRITE PARK
TOGGENBURG ST. @
WALKER RANCH PRKWY.

0.53 ACRE
Playground: Yes (2-5 yr.)
Picnic: Tables
Sports Fields: None
Sports Courts: None
Other Features: Open Lawn
Basin: No
Maintenance: Walker Ranch LMD
Comments:

Castlebrite Park is a pocket park with tot lot and picnic facilities.

There is good visibility into the park, but little space for active sport.

Additional shade would improve usability of the picnic areas.

N
2022 DRAFT

8.2.a
Packet Pg. 194 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 39

CITY PARK
W. LAS PALMAS AVE. @
OSSIE ST.

0.17 ACRE
Playground: No
Picnic: Table
Sports Fields: None
Sports Courts: None
Other Features: Bench
Basin: No
Maintenance: General Fund
Comments:

This small open space adjacent to Patterson Fire Station #1 provides a shady place for breaks or lunch.

N
2022 DRAFT

8.2.a
Packet Pg. 195 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
40 CITY OF PATTERSON

DEL PUERTO PARK
S. DEL PUERTO AVE.@
S. 5TH STREET

0.31 ACRE
Playground: No
Picnic: No
Sports Fields: None
Sports Courts: None
Other Features: Open Lawn, Benches, Mature Trees
Basin: No
Maintenance: General Fund
Comments:

Del Puerto Park is a small lawn area in downtown Patterson, shaded by mature and heritage trees.

N
2022 DRAFT

8.2.a
Packet Pg. 196 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 41

EARLY GOLD PARK
JERSEY LN. @
NEW FOREST WAY.

1.26 ACRES
Playground: Yes (5-12 yr.)
Picnic: Shelter, BBQ & Tables
Sports Fields: None
Sports Courts: ½ Basketball
Other Features: Open Lawn
Basin: No
Maintenance: Walker Ranch LMD
Comments:

Early Gold Park has good visibility into the park. Graffiti has been an ongoing problem. Additional shade would improve usability of the picnic areas.

N
2022 DRAFT

8.2.a
Packet Pg. 197 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
42 CITY OF PATTERSON

EL PESCADERO PARK
WALNUT AVE. @
BENNETT DR.

0.37 ACRE
Playground: None
Picnic: None
Sports Fields: None
Sports Courts: None
Other Features: Benches, Open Lawn
Basin: Yes
Maintenance: Walnut Square
Comments:

El Pescadero Park is a small detention basin park, which does not support active recreation. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 198 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 43

FLORAGOLD PARK
SHEARWATER DR. @
AMERICAN EAGLE AVE.

4.26 ACRES
Playground: Yes
Picnic: Tables
Sports Fields: Soccer and baseball practice on multi-use turf (not ADA accessible)
Sports Courts: None in park
Other Features: Open Lawn
Basin: Yes
Maintenance: Walker Ranch LMD
Comments:

Floragold Park is adjacent to Apricot Valley Elementary School, with which it shares multi-use fields. The actual fields are half-owned by Patterson Unified School District and half-owned by the City. There are two separate irrigation systems and two maintenance routines.

The field is used for soccer and baseball practice. The pedestrian bridge over Salado Creek provides pedestrian and bicycle access from the Salado Creek Trail. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 199 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
44 CITY OF PATTERSON

GARZA PARK
HARTLEY AVE. @
LORELEI AVE.

5.54 ACRES
Playground: Yes
Picnic: No
Sports Fields: 90’ Ball Diamond (lighted, with concrete bleachers), Soccer practice on outfield (Not ADA accessible)
Sports Courts: None
Other Features: Restrooms, On-site Parking, Concession Structure (closed)
Basin: Yes
Maintenance: General Fund
Comments:

Garza Park is the largest city park besides the Patterson Sports Complex. It has recently been upgraded with a new playground (for ages 5-12), and parking lot lighting. It is still in need of additional redesign and renovation. Although it has the City’s only 90’ ballfield (other than at Patterson High School), the field is largely unusable. The field is within the detention basin, resulting in repeated damage to the infield. The basin area is not accessible under current ADA regulations.

Security is an issue at Garza Park. The only park lighting is the field lighting on wooden poles. The concession stand has been boarded up and should be removed. The concrete bleachers invite shattered glass.

The playground is not visible from the street.

N
2022 DRAFT

8.2.a
Packet Pg. 200 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 45

GOLDBAR PARK
AMANTHA CREEK DR. @
GOLD CREEK DR.

3.80 ACRES
Playground: Climbing wall, Swing set
Picnic: Shelter & Tables
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: None
Other Features: Open Lawn
Basin: Yes
Maintenance: Walker Ranch LMD
Comments:

Goldbar Park is a basin park which is large enough for soccer practice and active recreation. The climbing wall is due to be replaced by other play equipment. Graffiti can be an issue here, as three sides of the park are bounded by rear yard fences, resulting in fewer “eyes” on the park. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 201 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
46 CITY OF PATTERSON

GOLDEN AMBER PARK
RED ROBIN DR. @

HEARTLAND RANCH
AVE.

1.29 ACRES
Playground: Yes (2-5 yr.)
Picnic: Shelter, BBQ & Tables
Sports Fields: None
Sports Courts: ½ Basketball (small)
Other Features: Open Lawn
Basin: Yes
Maintenance: Heartland Ranch LMD
Comments:

Golden Amber Park is a small park with a well shaded playground and an undersized basketball half-court. The irrigation system is in need of repair. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 202 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 47

MEADOW RUE PARK
GARDEN PATCH WAY @
W LAS PALMAS AVE.

2.85 ACRES
Playground: No
Picnic: Tables
Sports Fields: Soccer and baseball practice on multi-use turf with backstop (not ADA accessible)
Sports Courts: None
Other Features: Fitness Equipment, Open Lawn
Basin: Yes
Maintenance: Patterson Gardens LMD
Comments:

The field at Meadow Rue Park is used for youth baseball practice. Because homes do not face onto the park, vandalism has been a problem.

The fitness equipment will be replaced with children’s play equipment.

Some picnic areas are shaded. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 203 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
48 CITY OF PATTERSON

MUSTANG CLOVER
PARK

CALVINSON PARKWAY
@ GARDEN PATCH WAY

3.27 ACRES
Playground: Yes
Picnic: Shelter & Tables
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: Sand Volleyball
Other Features: Open Lawn
Basin: Yes
Maintenance: Patterson Gardens LMD
Comments:

Mustang Clover Park is a well used park. With homes facing onto the park, vandalism is low. Sand volleyball is popular. There are some shaded picnic tables.

N
2022 DRAFT

8.2.a
Packet Pg. 204 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 49

NEWCASTLE PARK
RED ROBIN DR. @
AMERICAN EAGLE AVE.

2.08 ACRES
Playground: Yes
Picnic: Shelter, BBQ & Tables
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: ½ Basketball
Other Features: Open Lawn
Basin: Yes
Maintenance: Heartland Ranch LMD
Comments:

The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 205 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
50 CITY OF PATTERSON

NOBLE PARK
NOBLE PARK CIRCLE @
BENNETT DR.

0.57 ACRE
Playground: Yes
Picnic: None
Sports Fields: None
Sports Courts: None
Other Features: Benches
Basin: Yes
Maintenance: Walnut Square, General Fund
Comments:

Noble Park serves as a detention facility and visual amenity. There is a play area at one end, and shady slopes along the length of the park.

The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 206 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 51

NORTH PARK
LAS PALMAS AVE. @
N. DEL PUERTO AVE.

0.98 ACRE
Playground: Yes
Picnic: Large Picnic Shelter, Large BBQ Pits & Tables
Sports Fields: None
Sports Courts: None
Other Features: Restrooms, Concession Building, Open Lawn Basin: No
Maintenance: General Fund
Comments:

North Park, along with Veteran’s Memorial Park (South Park) is a historic park central to Patterson’s civic life. These parks are focal points of many of Patterson’s civic festivals and events. They are shaded by mature trees.

North Park is underfunded. Restrooms and concession stand and picnic shelter all need to be replaced. A conceptual plan has been prepared for renovation of this park. (See Chapter 5, Recommendations.) N
2022 DRAFT

8.2.a
Packet Pg. 207 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
52 CITY OF PATTERSON

ROSETTE PARK

MENDOCINO CREEK
DR. @
AMADOR CREEK LN.

1.04 ACRES
Playground: Yes
Picnic: Shelter & Tables
Sports Fields: None
Sports Courts: 1/2 Basketball
Other Features: Open Lawn
Basin: No
Maintenance: Walker Ranch LMD
Comments:

Rosette Park’s climbing wall was replaced with a new playground for ages 5-12. There is good visibility into the park, and there are amenities for different age groups.

N
2022 DRAFT

8.2.a
Packet Pg. 208 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 53

SORENSEN PARK
AMERICAN EAGLE AVE.
@ WARD AVE.

1.83 ACRES
Playground: Yes (5-12 yr.)
Picnic: Tables
Sports Fields: None
Sports Courts: None
Other Features: Open Lawn
Basin: No
Maintenance: General Fund
Comments:

Access to Sorenson Park from neighborhoods to the north is via cul-de-sac or dead-end streets. From the south, the park is bordered by American Eagle Avenue, which carries high volumes of traffic, especially at school times. The north side of the park is bounded by rear yard fences. At the southwestern corner of the park, a Patterson Irrigation District lateral may provide improved pedestrian and bicycle access in the future.

N
2022 DRAFT

8.2.a
Packet Pg. 209 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
54 CITY OF PATTERSON

SUNFLOWER PARK
SUNFLOWER DR. @
NICASTRO DR.

1.63 ACRES
Playground: No
Picnic: No
Sports Fields: None
Sports Courts: ½ Basketball (not ADA accessible)
Other Features: Open Lawn, Tether Ball Pole (not ADA accessible) Basin: Yes
Maintenance: General Fund
Comments:

Sunflower Park is a deep basin with steep banks. The basin area, where the basketball, lawn and tether ball are located, is not accessible under current ADA regulations. There is little room for additional amenities outside the basin. This park is in very poor shape and lacks usable amenities. With some improvements, it could function well as a dog park.

N
2022 DRAFT

8.2.a
Packet Pg. 210 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 55

SUNGIANT PARK
SAMANTHA CREEK DR.
@ PLACER CREEK DR.

1.50 ACRES
Playground: Yes
Picnic: Tables
Sports Fields: None
Sports Courts: ½ Basketball
Other Features: Benches, Open Lawn
Basin: No
Maintenance: Walker Ranch LMD
Comments:

Sungiant Park has sculptural play equipment which has not been popular. The lawn is not in a basin, but does not function well for active sport practice due to its shape.

N
2022 DRAFT

8.2.a
Packet Pg. 211 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
56 CITY OF PATTERSON

SUNGLOW PARK
AMERICAN EAGLE AVE.
@ GANNET LANE

1.94 ACRES
Playground: Yes (2-5 yr.)
Picnic: Covered Picnic Shelter, BBQ
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: None
Other Features: Open Lawn
Basin: Yes
Maintenance: Heartland Ranch LMD
Comments:

With rear yard fences on most of Sunglow Park’s perimeter, there is poor visibility into the park, resulting in undesirable activities in the park. Graffiti is a problem. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 212 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 57

TILTON PARK
JAMES BURKE AVE. @
KESTREL DR.

3.5 ACRES
Playground: Yes
Picnic: Shelter and Picnic Table
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: None
Other Features: Open Lawn, Benches
Basin: Yes
Maintenance: Heartland Ranch LMD
Comments:

Tilton Park serves as a neighborhood park, but is also adjacent to the Community Center complex, including the Aquatic Center, Skate Park, and Senior Center. With the adjacent uses, it has the potential to attract a wider range of users. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 213 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
58 CITY OF PATTERSON

TRIGEM PARK
STEEL CREEK DR. @
PLACER CREEK DR.

0.82 ACRE
Playground: Yes
Picnic: Shelter & Tables
Sports Fields: None
Sports Courts: 1/2 Basketball
Other Features: Music panel, climbing rocks
Basin: No
Maintenance: Walker Ranch LMD
Comments:

Trigem Park is a very popular small park in a family oriented neighborhood. Alternative play equipment such as a music panel and climbing rocks are popular.

N
2022 DRAFT

8.2.a
Packet Pg. 214 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 59

VALLEY LUPINE PARK
W. LAS PALMAS AVE. @
SPERRY AVE.

0.90 ACRE
Playground: Yes
Picnic: Shelter
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: None
Other Features: Benches, Open Lawn
Basin: Yes
Maintenance: Patterson Gardens LMD
Comments:

Valley Lupine Park, situated on a prominent corner, but lacks amenities. As most of the park is a detention basin, there is little space to add amenities. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 215 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
60 CITY OF PATTERSON
VETERAN’S MEMORIAL
PARK
(SOUTH PARK)
LAS PALMAS AVE. @
S. SALADO AVE.

0.99 ACRE
Playground: No
Picnic: No
Sports Fields: None
Sports Courts: None
Other Features: Horseshoe Pits, Veteran’s Memorial, Open Lawn Basin: No
Maintenance: General Fund
Comments:

Veteran’s Memorial Park (South Park), along with North Park, is a historic park central to Patterson’s civic identity. This park is often used as an events space, and is shaded by heritage trees.

Veteran’s Memorial Park is underfunded and in need of renovations.

There is a new transit connection with new restrooms. The horseshoe pits are in need of an overhaul or replacement. There is interest in restoring a historic rose garden on this site.

N
2022 DRAFT

8.2.a
Packet Pg. 216 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 61

WILDING PARK
ASHWOOD LANE @

OAKWOOD LANE

2.47 ACRES
Playground: Yes
Picnic: Tables
Sports Fields: Soccer practice on multi-use turf (not ADA accessible) Sports Courts: 1/2 Basketball
Other Features: Open Lawn
Basin: Yes
Maintenance: Sutter Pointe LMD
Comments:

With the surrounding homes facing onto Wilding Park, there is excellent visibility and “eyes” on the park. Picnic tables lack shade. The basin area is not accessible under current ADA regulations.

N
2022 DRAFT

8.2.a
Packet Pg. 217 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
62 CITY OF PATTERSON

WOODLAND STAR
PARK
MARIGOLD DR. @

SCARLET LANE

2.19 ACRES
Playground: Yes
Picnic: Shelter & Table
Sports Fields: Soccer practice on multi-use turf
Sports Courts: None
Other Features: Open Lawn
Basin: No
Maintenance: Patterson Gardens LMD
Comments:

Woodland Star park is well used. There are amenities for different age groups, and good visibility into the park. Lighting is needed at the picnic shelter, as there are occurrances of vandalism. Light levels should not encourage undesired night use.

N
2022 DRAFT

8.2.a
Packet Pg. 218 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 63
T.W. PATTERSON SPORTS

COMPLEX
16651 WARD AVENUE
12 ACRES DEVELOPED

9.3 ACRES UNDEVELOPED

4.1 ACRES TRIANGLE PARCEL
Playground: Yes
Picnic: 2 Shelters with Tables & BBQs
Sports Fields: 2 60’ ball diamonds (lighted), soccer (1 lighted) / Multi-use practice fields
Sports Courts: None
Other Features: Restrooms, Concession Stand (for organized games only), Parking Lot, Dog Park with agility equipment,
Playground, Open Lawn
Basin: Partial
Maintenance: General Fund
N
2022 DRAFT

8.2.a
Packet Pg. 219 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
64 CITY OF PATTERSON
Comments:

The Sports Complex has the City’s only drained (by sand lines), adultsized soccer field, which is also used for T-ball and flag football. This field is closed in winter for field rest. The dog park was built as a volunteer project by Eagle Scouts. The concession stand, play structure, and restrooms are in good shape.

The existing Master Plan for the Sports Complex calls for the addition of four ball diamonds, batting cages, additional picnic area, parking and amenities. Two practice soccer fields are proposed on property currently owned by the Patterson Joint Unified School District. (See Chapter 5, Recommendations.)
T.W. PATTERSON SPORTS COMPLEX MASTER PLAN
2022 DRAFT

8.2.a
Packet Pg. 220 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 65

3.2 EXISTING COMMUNITY FACILITIES
Existing community facilities and programs were inventoried through review of the Recreation and Community Services Activity Guide, the Recreation and Community Services Department website, interviews with staff, and tours of the City. In addition to City-owned facilities and City-run programs, this Master Plan considers other existing resources that are available to the community.

GENERAL CITY FACILITIES
Hammon Senior Center
1033 W. Las Palmas Ave.

Facility Type: Recreation Building - Other
Description: Senior Center and Recreation Administration Facilities: Dining room (1585 sq. ft.).

Capacity: Dining: 106, Assembly: 226.

Amenities: tables, chairs, TV/DVD, PA system
Kitchen (313 sq. ft.)
Amenities: refrigerator, microwave, stove, oven, ice
machine, dishwasher
Arts & Crafts Room (728 sq. ft.)
Capacity: seating 48, assembly 104
Amenities: tables, chairs, PA system, TV/DVD,
whiteboard, sink
Exercise room (1042 sq. ft.)
Capacity: seating 70, assembly 148
Amenities: tables, chairs, storage, TV/DVD/VHS,
PA system, whiteboard, sink
Conference Room/Computer Lab (235 sq. ft.)
Capacity: 8
Amenities: tables and chairs, whiteboard,
4 computer stations
Lounge with pool table, board games, TV, library
Outdoor courtyard
Conference Room: board table with seating for 8
Limitations: Seniors desire the spaces to remain for senior programs only. The dining room is not large enough to host community special events or large rentals.
2022 DRAFT

8.2.a
Packet Pg. 221 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
66 CITY OF PATTERSON
Patterson Aquatic Center
1025 W. Las Palmas Ave.

Facility Type: Outdoor Pool
Description: Aquatics Center
6-lane Competition Pool
Small Water Feature, Zero Depth Entry
Lockers, Restrooms, Showers
Concession Stand
Programs: Lap swim, Public swim, Swim lessons, Recreation swim team, Water aerobics, Patterson High School Swim Team Limitations: The lap pool is small and shallow for competitive uses. The play area of the pool is undersized.

Comments: The Aquatic Center is a very popular community amenity.

Patterson Skate Park
1025 W. Las Palmas
Facility Type: Recreation Amenity - Other
Description: 14,000 sq. ft. plaza/street style skate park 1 bowl for vertical skating
Ramps, rails, stairs
Large shade structure
Spectator area
Programs: Drop-in skateboarding
2022 DRAFT

8.2.a
Packet Pg. 222 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 67

SPECIAL USE CITY FACILITIES
Patterson City Hall
1 Plaza
Facility Type: Civic
Description: City Hall
Small and large meeting rooms
Programs: Special meeting purposes
Limitations: Formal meeting space only
Walnut Grove School Community Gymnasium
775 Hartley Ave.

Facility Type: Community Gymnasium
Description: Community Gymnasium
• 1 full size basketball court
• 2 practice basketball courts
• 1 competition volleyball court
• 2 practice volleyball courts
• Restrooms & locker facilities
Programs: Sports and leagues
Limitations: Limited access to the gym for community use. Gym is co-owned by City; but City does not have access during school hours.

Facilities Used for Programming (Owned by School District) Patterson High School
200 N. 7th Street
Facility Type: School
Description: Gymnasium, Auditorium, Stadium
Programs: Limited public access for use
2022 DRAFT

8.2.a
Packet Pg. 223 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
68 CITY OF PATTERSON

OTHER PROVIDERS
The City of Patterson is deficient in many of the alternative leisure amenities found in cities of similar size and demographics. Not found in Patterson are leisure activities associated with:
• Movie Theater
• Bowling Alley
• Arcades
• Mall
• Chain, Sit-down Restaurants
• Amusement Center
• Climbing Gym
• Yoga Studios
The deficiency of entertainment amenities for the teen and young adults is substantial and places urgency on the Parks and Recreation Department and the School District to provide alternative leisure opportunities for this age group. With the influx of new residents arriving from urban settings, there are expectations for access to amenities they previously enjoyed. These deficiencies are especially felt by youth, who report that their social and leisure outlets are significantly lacking.

Private Service Providers
The inventory of facilities and programs available to residents through the private sector and other public entities include:

Patterson Health & Fitness
Anytime Fitness
Weight Watchers
Roundhouse Fitness
YV Fitness
CrossFit
Martial Arts
Dance Instruction
Child daycare providers
• CCCDS Patterson Child Development Center
• Del Puerto Early Headstart Child Development Center
• Kingdom Kidz
• Northmead Head Start and Preschool
• Patterson Prekindergarten Literacy Program
• Patterson Pre-School Academy
• Sacred Heart Catholic Preschool
2022 DRAFT

8.2.a
Packet Pg. 224 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 69
• Walnut Acres Preschool
• Price’s Day Care
• Bright Beginnings Daycare/Preschool
Private Event Venues
Diablo Grande Golf & Country Club
9521 Morton Davis Dr.

Banquet and Restaurant, Outdoor Patio, Meeting Rooms, Clubhouse with Golf Shop, Locker Rooms, Golf and Pool
FDES Hall
501 Ward Ave
Capacity: 780, includes kitchen
Lopes Orchards De Paul Center
505 M Street
Capacity: 480
Rental hall, kitchen, two 25-person meeting rooms
Masonic Hall
605 N 6th Street
Capacity: 200
Bonaventure Hall
529 I Street
Capacity: 325
Father Conner’s Hall
Capacity: 175
Banquet and event facility
Best Western Villa Del Lago Inn
2959 Speno Drive
Hampton Inn Patterson
2467 Sperry Ave

3.3 EXISTING PROGRAMS
Recreation and Community Services
To complete a successful parks and recreation master plan it is important to reflect the community’s unique character and diverse recreation2022 DRAFT

8.2.a
Packet Pg. 225 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
70 CITY OF PATTERSON
al needs. Master planning defines core services, creates standards, sets community priorities, and initiates an implementation strategy.

The City of Patterson has a small town character and a community that is sports oriented and culturally rich. The city desires thoughtful development in order to sustain their unique identity and a sense of place. The city is committed to providing high quality programs and the facilities required to support those programs. To meet this goal new facilities must be developed, and adequate funding is necessary to maintain facilities and enhance the users experience, ensure user safety, and maintain civic pride that is integrally associated with public parks and public places.

Cost Recovery
The impact of the economic downturn on local budgets nationally has made it increasingly important for parks and recreation departments to incorporate a more business like model of operation. The dilemma of subsidy vs. pay for play has become an increasing factor in the decision-making realm of city budgets. Patterson’s Recreation and Community Services Department budget subsidizes programs and facility operations in order to serve the community; however funding for the department is not sufficient to sustain this policy.

It is necessary for the department and the city to establish priorities in service and cost recovery and to build in sufficient fees to support service delivery. A priority system for programs and services are recommended to meet community desires and cost recovery expectations for facilities and programs established.

Program Needs
Recreation programming is limited in the City of Patterson due to the limited availability of facilities in the community. The senior center and aquatics center provide an initial level of service to the community. The department is re-defining the provision of recreational opportunities by promoting self-directed programming and spaces that encourage self-participation.

Programming challenges:
• Limited availability of private sector leisure and social activities for pre-teen and teens within city limits places a greater demand on the Recreation and Community Services Department
• Communication and outreach to parents who speak and read only 2022 DRAFT

8.2.a
Packet Pg. 226 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 3 INVENTORY

PARKS AND RECREATION MASTER PLAN
CITY OF PATTERSON 71
Spanish
• The lack of public transportation providing access to facilities • Long work and commute hours for residents/parents limits access for youth
There is significant unmet need as a result of limited access to indoor programming space:
• Dance, yoga, aerobics, group exercise
• Sport courts for basketball and volleyball
• Banquet space
• Meeting space
• Martial arts, dance, music, arts, photography
• Cultural programming
• Performing arts
• Community special events
The City of Patterson is predominately Hispanic, a population that has identifiable recreational characteristics, cultural traditions, and strong family bonds. Recreational preferences typically include casual, informal gathering of family and friends “spending time together.” It is important for the Recreation and Community Services Department to recognize these cultural influences and incorporate them into their space planning and programming. Marketing in Spanish to adequately reach this significant community subset is important. Hispanic community leaders and church connections are very influential with this community. According to a study by the UCLA Anderson School of Management, Applied Management Research Program, The Hispanic Community and Outdoor Recreation (2006), three most valued and influential aspects of Hispanic culture are family, community, and personalization. Hispanics are as interested in participating in sports and other physical activities for health reasons as they are for social reasons. The master plan must account for a broad range of potential pursuits including active and passive recreation and sports.

Fees
The City of Patterson aspires to ensure sufficient cost recovery through fees for programs and facilities to increase sustainability. The City has been able to provide its citizens highly subsidized programs and facilities.

There are programs upon which high community benefit value is placed and the City may place a low requirement for cost recovery and 2022 DRAFT

8.2.a
Packet Pg. 227 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

PARKS AND RECREATION MASTER PLAN
3 INVENTORY
72 CITY OF PATTERSON
agree to subsize the programs. Following are programs the Parks and Recreation Department currently places in that category:
• Aquatics Center is a community priority and subsidized • Youth development programs, activities and classes are highly subsidized • Senior activities and Center are subsidized with rentals providing minimal cost recovery
Cost-recovery through added or increased fees is an area that requires policy direction, as decisions to allocate tax dollars to provide the most benefit to the community. A plan and system in place, which prioritizes programs and facilities, will assist in the annual budget allocation.

With the future funding and development of new facilities, consideration and planning will be critical to optimizing cost recovery potential. Revenue opportunities include:
• Special events
• Increased class cost recovery
• Rental fees of new public spaces
• Increased program offerings with introduction of each new public space
• Leagues and tournaments
• Theater and beverage sales
Partners
Partners have been a viable means of providing services with the utilization of shared resources. The Patterson Joint Unified School District has been a partner in the past, however with limited financial resources this partnership has become less viable. Exploring further partnerships should be developed to stretch limited resources and combine efforts.
2022 DRAFT

8.2.a
Packet Pg. 228 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

4. NEEDS A SSESSMENT

8.2.a
Packet Pg. 229 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 230 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 75
4 NEEDS ASSESSMENT

PARKS AND RECREATION MASTER PLAN
4 NEEDS ASSESSMENT
This Master Plan has been developed with significant input and participation from City Staff as well as from engaged and informed community members. Community input was elicited through a Steering Committee which met regularly to help guide the process; two community workshops; focus groups and stakeholder interviews, (3) pop-up events, and (1) online community survey. The community’s recreational needs were assessed based on this input as well as on a variety of research methods, including: (1) demographic analysis, (2) identification of recreation trends, (3) benchmark analysis, (4) data collection to identify and quantify current demand, (5) inventory and assessment of current programs and facilities, (6) identification of deficiencies, and (7) projections of demand and the facilities needed to serve that demand over the next ten years, and to build-out.

Demographic analysis assists in identifying important characteristics of the population. Age, income, race and ethnicity, education, and other factors can be used to estimate current and future demand for specific types of programs and uses. The trends analysis included identification of the impact of national and state trends on recreation participation, planning of new facilities, and the operations. Benchmarking is used to aid in establishing service and facility standards and goals. Benchmarking serves as a ‘barometer’ to show how a city compares to a peer community or communities. Because it is a comparable community in terms of size, population, and economic condition, the City identified Riverbank, California as a peer community.

Recreation services for all public and private service providers within the City were inventoried and analyzed to assess capacity of market to serve the needs and interests of residents. A thorough review of information developed by the City, including reports, plans, drawings, program offerings, and operating budget was completed. The team interviewed Staff, conducted on-site tours of public facilities and conducted in-person and telephone interviews of selected community members and stakeholders. Information was presented at Steering Committee meetings and community workshops. Information gathered in these meetings was incorporated into the Master Plan.

4.1 COMMUNITY PARTICIPATION
The Parks and Recreation Master Plan Steering Committee met regularly to provide input and to guide the planning process. The Steering Committee is composed of community members with a wide range of interests and perspectives on Parks and Recreation (sports, seniors, performing arts, natural environment). Two Community Workshops, attended by over 100 community members, were held to gain broader input. Additionally, a focus group comprised of sports representatives provided direction and information regarding the needs of Patterson’s large and active field sports community. Representatives from the Patterson Joint Unified School District attended and participated in all of the meetings and workshops. (Meeting materials and notes are provided in Appendix A.)
2022 DRAFT

8.2.a
Packet Pg. 231 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 76 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
4 NEEDS ASSESSMENT
Steering Committee Meeting #1
At its first meeting in April 2012, the Steering Committee discussed expectations for the Master Plan process, what is working well with Patterson’s existing parks and recreation system, what unmet needs currently exist, and what opportunities exist for the future. The Committee supported:
• “Park-centric” planning,
• Collaboration with the schools and sports leagues,
• Parks that are designed to be large, multi-generational facilities, • Expressing themes related to Patterson’s history and identity, • Preserving natural habitats, and
• Supporting Patterson’s economic development and its potential as a destination.

The Committee pointed out many of the positive aspects about the current park system, including the skate park, the sports complex, the Salado Creek trail, dog park, active sports groups and volunteers, and the senior and aquatics centers. Some of the initially identified needs included better bike and pedestrian connections to parks, natural open space parks, an outdoor performance venue, more dog parks and community gardens, and rest rooms, storage and concessions. The Committee also identified additional stakeholders to involve in the planning process, and methods for reaching out to the broader community.

Community Workshop #1
The first Community Workshop, in April 2012, was attended by more than 80 community members, including a large number of youth.

Meeting materials and the presentation were provided in English and Spanish. Major themes that arose from the group discussion included the need for:
• more game and practice fields for soccer and baseball • lighted sports fields to extend available playing time • dedicated fields (which are not compromised by being located in detention basins or overlaid with other uses)
• amenities such as rest rooms and drinking fountains, and • parks on the east side of town.

When participants were asked to indicate their priorities for Patterson’s parks, a number of trends emerged:

Field Sports
• Soccer was most popular
2022 DRAFT

8.2.a
Packet Pg. 232 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 77
4 NEEDS ASSESSMENT

PARKS AND RECREATION MASTER PLAN
• Baseball and football were also popular
• Indoor soccer facility is desired
• Competition for field time makes joint use with other sports groups challenging
Other Sports & Activities
• Aquatics and volleyball were most popular
• Water play (spray park) was very popular
Community Facilities
• Martial arts, dance and music were most popular
• There were many suggestions for facilities, including bowling alley, zoo, movie theater, and more
Enjoying Nature
• Biking, fishing & creek interface were most popular
• Need to protect habitat and natural character of Del Puerto Canyon Special Uses
• Dog park was most popular
• Farmers’ market and community gardens were desired uses • Bocce and exercise stations were also mentioned
Steering Committee Meeting #2
At its May 2012 meeting, the Steering Committee reviewed the results of the Community Workshop, focusing on sports needs, the desired character for a theater /performance space, as well as potential partnerships, and joint use. There is an immediate need for more sports fields for soccer, football, and baseball, as well as for full-court, lighted basketball courts.

Sports Focus Group Meeting
In June 2012, a Sports Focus Group met to discuss specific immediate sports field needs as well as considerations in planning for the future needs of a growing population. Preferences regarding locations, configurations, and conditions were discussed as well. Generally, soccer stakeholders prefer multiple fields in one location for tournament play, football stakeholders prefer fields in several locations due to practice schedule conflicts, and baseball stakeholders prefer pinwheel groupings of ballfields distributed throughout Patterson. Strategies for filling the current needs included expanding school partnerships and creating a Sports Alliance to manage scheduling conflicts.
2022 DRAFT

8.2.a
Packet Pg. 233 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 78 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
4 NEEDS ASSESSMENT
Steering Committee Meeting #3
The June 2012 meeting of the Steering Committee focused on community-wide parks and facilities. To serve the future population, additional community center facilities and gathering spaces will be needed, and aquatics will need to be expanded. There is currently unmet demand for more aquatics. Uses appropriate for community parks were discussed at length. Distribution and co-locations of uses was discussed, as well as special uses such as equestrian facilities and fishing. A black box theater could serve both the High School and community users, and could provide cost recovery. Making parks identifiable by including special gardens and/or art was supported.

Community Workshop #2
The second Community Workshop, in June 2012 presented the vision and concepts for neighborhood and community parks and facilities in Patterson. The concepts and vision developed by the Steering Committee were generally well received.

Steering Committee Meeting #4
At the final Steering Committee meeting in October 2012, the Committee reviewed the draft document.

The Parks and Recreation Master Plan was put on hold shortly after the draft document was reviewed in late 2012. In 2021, the City restarted Master Plan efforts by reaching out to the community to consider changes in public opinion on Patterson’s current park and recreation offering, and desired changes and improvements for the future.

Pop-Up at Back-to-School Block Party and other City Events The City of Patterson hosts a Back-to-School Block Party and Safety Fair in mid-August, which is highly attended. Multiple city departments, school, and organizations participate, including the Parks and Recreation Master Plan Team at the 2021 event. Residents were asked what they like about the existing parks, and what they would like to see in future parks, the planned recreation center, and planned expansion to the aquatics complex.

Additionally, the Parks and Recreation Master Plan engaged with the community at a BBQ put on by the Sheriff’s Department, and the Halloween floating pumpkin patch event at the Aquatics Center. 2022 DRAFT

8.2.a
Packet Pg. 234 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 79
4 NEEDS ASSESSMENT

PARKS AND RECREATION MASTER PLAN
Online Survey
An online survey was open for public responses from August to October 2021. Over 170 people responded, sharing their insight and experiences with existing parks in Patterson, what they like and use, and what they’d like to see in the future parks and recreation system.

The survey and responses are included in the Appendix.

4.2 BENCHMARKING
Benchmarking is a tool that can be used to aid in establishing service levels and facility standards. Benchmarking compares the city’s existing facilities and services to those offered by peer communities.

Staff considered the cities of Modesto, Turlock, and Riverbank for a benchmarking study. The City of Modesto was excluded because of it large population (202,751) and Turlock because its higher per capita and family household income when compared to the City of Patterson.

City of Riverbank is similar to the City of Patterson in many respects:

Patterson Riverbank
Total Population 22,066 24,482
Median Household Income $69,233 $70,549
Per Capita Income $23,347 $25,776
Median Age 31.1 years 32.6 years
% Growth 2000-2010 / 2010-2019 75.9% / 16.5% 4.3%/ 9.7% (Source: 2019 American Community Survey 5-Year Estimates) The benchmarking study shows that the City of Riverbank has more public facilities and offers greater leisure opportunities to its citizens when compared to the City of Patterson. This may be attributable to the efforts of the Riverbank Redevelopment Agency. The City of Riverbank has a dedicated teen center, community center, and an additional facility, Scout Hall, that provides space for expanded community programming. In addition, Riverbank has non-city entities providing a movie theater and bowling.

The benchmark study found that the City of Riverbank appears to have the community facilities that the City of Patterson is lacking, specifically a community center. A community center supports the programming desired by the residents and provides large indoor gathering space for community events. A review of the program offerings for each city demonstrates a sharp contrast in the quantity of programs 2022 DRAFT

8.2.a
Packet Pg. 235 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 80 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
4 NEEDS ASSESSMENT
and activities available to the community. The City of Riverbank is able to provide considerably more due to its greater inventory of community facilities. The City of Patterson by comparison, lacks a permanent teen space, a dedicated community gymnasium, and outdoor plaza space that can be used for performance or social and cultural events. Both cities have an outdoor sports complex, skateboard park, and aquatics facilities. The detailed comparison can be found in Appendix B.

4.3 COMMUNITY ACCESS STUDY
During 2011 and 2012, for her Masters Project at Humboldt State University, Leanne Lynch, a former Patterson resident, compiled and analyzed data about barriers to access to parks in Patterson. The information was drawn from online sources, personal observation, and participatory surveys of Patterson adults and children.

The project first assessed park access based on distance. Residents who were within 1/4 mile of a park, with the route to the park unimpeded by barriers were considered to have high access to parks. The population under age 18 having low access to parks was estimated at 6,800, predominantly in the eastern portion of the City. The map at the right depicts high access to parks in blue, and low access to parks in orange, in the population under age 18. The project next assessed reported criminal activity at or near parks, to test the assumption that people’s perceptions of crime and safety issues may also be barriers to access.

To examine whether community members consider distance and/or perceptions about crime as barriers to park use in Patterson, Ms. Lynch conducted surveys at Patterson’s Earth Day event, the Apricot Fiesta, through after school programs, and at a local business. 13 children aged 10 and 11, and 30 adults responded to the surveys. The surveys revealed useful information about how residents use the parks, as well as identifying barriers to park use. To a large degree, responses from children and adults reflected similar patterns. The report, “Access to Recreational Open Space in Patterson, CA” is included as Appendix C.

Among the findings:
• Less than half of the respondents travel to parks by car • Active sports were mentioned most often as what attracted respondents to the parks (either as participants or bringing their children) 2022 DRAFT

8.2.a
Packet Pg. 236 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 81
4 NEEDS ASSESSMENT

PARKS AND RECREATION MASTER PLAN
• Adults and children use the parks for informal socializing with friends and family, play and relaxation
• Activities with dogs are a common draw
• Safety concerns were sited by both children and adults as barriers to park use (including gangs, alcohol use, graffiti, etc.) • Distance and other physical access issues (lack of bike lanes or sidewalks, bad roads) were barriers for a number of respondents • Lack of shade was identified a number of times as a barrier to park use
• Lack of amenities was noted by a number of respondents • Many respondents advocated for more community involvement, programmed events, neighborhood participation, more green (landscaping & trees) and improved access and safety measures.

4.4 CURRENT NEEDS AND DEFICIENCIES
The needs assessment has identified a number of needs and deficiencies in the existing park system. Some of these may be remedied in the near term, and others inform the design and planning of future parks.

Community Parks
• All but 2 of Patterson’s parks are under 5 acres. The City lacks large parks that can accommodate multiple user groups and large events.

Access
• Much of the east side of Patterson lacks access to parks. Safe and direct pedestrian and bicycle access to parks in general should be improved.
• At the same time as the 2021/2022 update to the 2012 draft Master Plan, the City was concurrently creating the Active Transportation Plan (ATP).

Safety
• Safety concerns deter residents from using some of Patterson’s parks. In some cases, park redesign or additional programming could improve this situation.

Field Sports
• Patterson lacks competition and practice fields for soccer, baseball and football. The sports uses are often overlaid on multi-use turf, and scheduling conflicts are challenging. Sports are played on fields that lack parking, lighting or rest rooms. Most practice fields are also detention basins, which limits their use during the wet season.

Currently, the detention basin fields do not meet ADA accessibility requirements.
2022 DRAFT

8.2.a
Packet Pg. 237 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 82 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
4 NEEDS ASSESSMENT
Soccer
• The one existing competition soccer field is inadequate for the high participation in organized soccer programs. Of the 18 parks with lawn area large enough for practice soccer, 14 are detention basins.

The large Keystone Basin is used for soccer and football, but lacks parking, lighting, or rest rooms. Court soccer is also becoming popular, and an indoor facility would be well used.

Football
• Patterson’s youth football teams compete for field space during the season. Additional lighted fields are needed.

Baseball
• Baseball and softball are popular in Patterson. The regular season is February through July, but there are tournaments year round.

There is only one City-owned 90’ diamond, in Garza Park, but it is located in a detention basin and the infield is damaged by flooding on a regular basis. When the Sports Complex is built out, there will be tournament capability.

Court Sports
• There is a lack of tennis courts and full-court basketball for league use. Many of the existing 1/2 basketball courts are undersized.

Amenities and Equipment
• Many of Patterson’s existing parks lack amenities such as shade, drinking fountains, or programmed space.

Special Uses
• There is demand for additional dog parks, teen space, and specialized uses such as access to wifi.

Natural Open Space
• There are sites within the planning area that could provide habitat and a place to experience relaxation and play in a natural setting, such as the San Joaquin River and Del Puerto Creek corridors. • During the COVID-19 pandemic, access to nature was a resource many in the community turned to for respite and relaxation. Increasing interest in these spaces has occurred during the pandemic.

Aquatics
• During the 2021 outreach efforts, there was an emphasis on adding water play amenities to both the Aquatics Center and within parks. 2022 DRAFT

8.2.a
Packet Pg. 238 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

5. RECOMMENDATIONS

8.2.a
Packet Pg. 239 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 240 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 85
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Play area in neighborhood park
Event at community park

5. RECOMMENDATIONS
The Patterson General Plan sets out a goal of providing 5 acres of parkland per 1,000 residents of Patterson.

In order to develop an integrated park and recreation system that is tailored to the needs and priorities of the Patterson community as it grows over time, a more comprehensive set of goals, standards and recommendations for the parks and facilities must be in place. This chapter establishes goals and standards for quantifiable elements of the parks and recreation system. It also includes recommendations and criteria for development of future parks, facilities and program elements.

5.1 PARK TYPES
An integrated park system provides a range of recreational opportunities, from casual relaxation to organized sports activities and civic gatherings. To achieve this, the City must plan its parks within an overall framework of including neighborhood parks that primarily serve their surrounding residents, and community parks and facilities that serve the community as a whole.

Neighborhood Parks
Neighborhood parks provide easily accessible open space for local residents. Neighborhood parks typically offer a range of active and passive activities, and are reachable by walking or biking without crossing major streets. A neighborhood park should include small and large places to gather as well as places for individual relaxation. It should provide areas for active recreation, such as multi-use turf, practice sports fields, or court sports. It should also include elements for all ages, such as playgrounds for tots, and walking paths and benches for seniors. This type of park is the focal point and social center of its neighborhood. To accommodate the its appropriate uses, a neighborhood park should be a minimum of 3 acres in size.

Community Parks
Community parks provide features and activities that attract people from throughout the community. A community park is typically large enough to contain elements such as competition sports fields, aquatics, or a community center. It may accommodate large gatherings or events. A community park may also be a park with special use or character, such as a natural area, an equestrian center, an amphitheater for performances, or a civic park with facilities for formal events. With the exception of some special use parks, a community park should be a minimum of 20 acres in size.

8.2.a
Packet Pg. 241 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 86 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Neighborhood park with play and picnic
Standards and recommendations for neighborhood parks, community parks and community facilities follow in this chapter. Design guidelines for these parks are contained in Chapter 6.

5.2 PARK ACREAGE AND SERVICE AREA STANDARDS
The General Plan’s stated goal of 5 acres per 1,000 residents should allow for sufficient land to create a variety of parks that meet the recreational needs of the community. Patterson currently has 98 acres of parks and community facilities, or approximately 4.6 acres per 1,000 residents. This acreage, however, includes undeveloped park property and parks that also serve as detention basins, with limited usability during wet periods. Only two of the 34 existing parks are larger than 5 acres. More park acreage is needed in order to create an integrated park system with a variety of parks and facilities to serve Patterson’s existing population, and acreage will need to increase as the population grows.

Recommendation:

Provide 5 developed and usable acres of parkland per 1,000 residents.

To meet this standard at Patterson’s current population, the City should acquire a minimum of 22 additional acres of parkland, and improve the undeveloped acreage that it currently owns.

STANDARD - 5 ACRES PER 1,000 RESIDENTS
Date Population Park Standard
(Acres)
Acres
Needed
2012 21,000 105 7
2022 23,000 120 22
Build-Out 66,000 330 232
(The current 98 acres includes undeveloped acres at the Sports Park, and includes the Community Center Complex property. It does not include school property.)
Future parkland that is acquired by the City should be usable yearround to be given full acreage credit. If the park acreage includes a detention basin, credit shall be apportioned according to the estimated usable time for the detention basin portion of the acreage, provided that it is accessible under ADA.

In order to create an integrated and balanced system, parkland dedication should include land for both community and neighborhood parks.

Table 5-1: Park Acreage Standards and Current Deficits

8.2.a
Packet Pg. 242 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 87
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Neighborhood park playground
Recommendation:

Of the 5 acres per 1,000 residents, 2 acres should be designated for community parks and 3 acres for neighborhood parks.

PARK TYPE STANDARDS
Ratio Size Service
Area
Neighborhood
Park
3 acres
per 1,000
Min. 3 acres 1/4 to 1/2
mile
Community
Park
2 acres
per 1,000
Min. 20 acres* 1 to 2 miles
* NOTE: Exceptions may be made for special purpose communityserving parks Patterson’s parks should be located to provide safe and convenient access to all Patterson’s residents. Residents should be able to walk to a neighborhood park within 5 or 10 minutes, without having to cross a major barrier such as an arterial street or railroad track. Currently, most residents in Patterson’s newer neighborhoods have access to an existing neighborhood park, although many of the parks are of insufficient size to be classified as a “neighborhood park.” As can be seen on the following map, many parts of Patterson’s older neighborhoods, especially east of Ward Avenue, lack convenient access to a neighborhood park.

Park Service Area (2012)
Table 5-2: Park Standards by Type

8.2.a
Packet Pg. 243 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 88 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Community park group picnic space
Map of Future Park Distribution
952
916
915 917
929
928
946
925
918
953
926
9 0
924
927
947
954
921
902
931
912
908
943
910
945
914
923
907
938
906
939
905
940
935
936
934
482
932 941 944
911
942
901
913
920
909 484
488
950
485
904
937 955
951
922
919
933
903
I-5
I-5
ACCESS

DANIEL RD

SPENO DR

RENZO LN

CHESTNUT AVE

ANNAMARIE AVE

OSSIE ST
ACCESS
N 2ND ST
I-5
I-5
HWY 33
HWY 33

ELM AVE

SYCAMORE AVE

WARD AVE

FIG AVE

BALDWIN RD

OLIVE AVE

ROGERS RD

SPERRY AVE

LEMON AVE

ORANGE AVE

LOCUST AVE

WALNUT AVE

ALMOND AVE

ZACHARIAS RD

POMELO AVE

E LAS PALMAS AVE

EUCALYPTUS AVE

RAINES RD

ELFERS RD

APRICOT AVE

W MARSHALL RD

ASH AVE

MAGNOLIA AVE
N 1ST ST
M ST
I ST

BARTCH AVE

DEL PUERTO CANYON RD

DIABLO GRANDE PKWY

FRUIT AVE

E MARSHALL RD
J ST
L ST

MINNEAR RD

DONKIN RD
K ST

POMEGRANATE AVE
C ST

POPLAR AVE
N 3RD ST

S DEL PUERTO AVE
S 1ST ST

POPPY AVE
N 4TH ST
S 2ND ST
D ST
S 3RD ST
N 5TH ST
F ST

IVY AVE

SHEARWATER DR

CALVINSON PKWY
S 9TH ST
N 7TH ST
S 4TH ST
E ST
H ST

W LAS PALMAS AVE

HENLEY PKWY

ACACIA AVE

AMERICAN EAGLE AVE

N SALADO AVE
S 5TH ST
S 6TH ST

QUINCE AVE
N 9TH ST

CLOVER AVE

RED ROBIN DR

PRUNE AVE

PIPIT DR

ROADRUNNER DR

ROSE AVE

DAISY DR

N HARTLEY ST

CLIFF SWALLOW DR

OSPREY DR

PHLOX DR

FINSTER ST

KESTREL DR

MISTLETOE AVE

HOLLY AVE
S 7TH ST

WEBER AVE

CHESTNUT AVE

BERLIN WY

OLD LAS PALMAS AVE

PEREGRINE DR

WEST MAIN ST

KEYSTONE PACIFIC PKWY

DAVIS RD

BELLA FLORA LN

BARROS ST

MARIGOLD DR

GUSTAFSON AVE

HEARTLAND RANCH AVE

JAMES BURKE AVE

DAHLIA AVE

SEARS DR

JASMINE DR

LILAC AVE

TERN WY

SAMANTHA CREEK DR

PALOMINO WY

TRAINA DR

KINSHIRE WY

LORELEI LN

AZALEA DR

PAINT WY

ASHWOOD LN

S AMERICAN EAGLE AVE

EIDER DR
8TH ST

MILLWOOD DR

CREEKSIDE DR
B ST

MORAY WY

ANGUS ST

SCARLET LN

IBIS DR

NUBIAN ST

PARK CENTER DR

TISSOT DR

LEVERTON DR

PINTO WY

BUCKSKIN WY

S HARTLEY ST

GARDEN PATCH WY

S EL CIRCULO

N EL CIRCULO

WALKER RANCH PKWY

FAWN LILY DR

TOGGENBURG ST

BULLFINCH DR

KEYSTONE BLV

MESA CREEK DR

LAVENDER LN

HANNAH DR

THRUSH DR

PLACER CREEK DR

MULBERRY AVE

JERSEY LN

SWEET PEA DR

MARISA DR

SKIMMER DR

SPERRY RD

MARY JANE AVE

ORKNEY DR

WIGEON LN

TULIP LN

DURER DR

NEW FOREST WY

ROXANNE DR

ROSEMARY DR

VAN GOGH LN

LEATHER CREEK LN

STARK RD

LONGHORN LN

VICKI LYNN LN

OAKWOOD LN

PERIWINKLE DR

WASHBURN ST

MACKILHAFFY DR

JAKE CREEK DR SWAN DR

MENDOCINO CREEK DR

TOYON LN

FLICKER LN

ARAMBEL DR

JEWEL FLOWER DR

PASA FELIX DR

BRAHMA ST

FALL AVE

HOLLYHOCK CI

NICASTRO DR

LEMON BLOSSOM LN

BLUE HERRON DR

COUGAR CREEK DR

MESQUITE DR

BECK CREEK LN

GREBE LN

YELLOWHAMMER DR
N 6TH ST

HUNTER CREEK DR

SQUASH CREEK LN

NORTHMEAD WY

FOUNTAIN GRASS DR
MOE DR

DOWITCHER DR

ABELIA LN

GANNET LN

SNOW CREEK LN

SHORTHORN ST

INAUDI DR

MAYETTE ST

LOGAN WY

SUNFLOWER DR

MARGUERITE LN

WOLFPACK CT

MEGHAN DR

PARAMATTA DR

MESSER PL

DAYLILY LN

VINEYARD AVE

TOTMAN CT

EL CAMINO DR

IMPERIAL LILY DR

CONDOR CT

WALNUT CT

HACKNEY ST

MADRONE LN

RIDGE CREEK LN

MORNING GLORY DR

PITSCOTTIE LN

CHESTERFIELD DR

MIRAGGIO DR

BENNETT DR

BRANGUS LN

BLUE FLAX DR

TARLAND LN

DYLAN CREEK DR

MORAY CT

SWEETWOOD LN

THOROUGHBRED ST

SPOONER CT

LOLA LN

HILLSTOCK CT

CHERRY BLOSSOM LN

KNUTSON ST

KINGFISHER DR

SPRING AVE

BEAVER CREEK DR

AMBERINA DR

FRANQUETTE ST

WESTFIELD PL

BERRENDAS ST

INAUDI CT

TYLER CT

PAYNE ST

WOOD CREEK DR

NOBLE PARK CI

S SALADO AVE

SWEET BRIAR DR
PLAZA

HAMMON CT

CHASE ST

PINE CREEK LN

STONE CREEK LN

ORCHID LN

ANGORA ST
GITY

CORNFLOWER DR

BERTWOOD LN

N DEL PUERTO AVE

LA LYNN DR

SANDERLING DR

BEACHWOOD LN

BROOK HOLLOW DR

SUMMER PHLOX LN

GOLD CREEK DR

WANZIA LN

SUSAN ST

BLACK CROW LN

SPANISH BARB WY

TEAL CT

WARBLER LN

CARLY CREEK DR

CABANEL WY DELPHIA DR

GNESA DR

ZINNIA CT

DARPINO CT

MEADOW CREEK DR

TORVEND WY

STONECHAT LN

GOLDFINCH LN

WESTFIELD LN

DEER HOLLOW DR

SNAKE CREEK DR

WINTER LN

ROCK CREEK LN

SUMMER LN

SPARROW HAWK LN

HANSEN CT

ARABIAN WY

ROGERS CT

HYACINTH DR

HALLEY CT

SAFFRON WY

BONNEAU CT

GUERNSEY ST

EMILY CT

GARDENIA CT

MERTZ CT

MAC DUFF WY

WANZIA CT

CURLEW CT

ITTURRERIA DR
ACCESS

SUNSET CT

KIRKWALL WY

TROUT CREEK LN

HOFFMAN CT

SHIRLINDA WY

TUSCANY CT

PUFFIN CT SIERRA CREEK CT

DAMARA CT

ANEMONE CT MONET WY
ALPINE CREEK DR.

TIREE PL

DEMSEY CT

SHETLAND WY

AMADOR CREEK LN

GERBER CT

NORDELL PL

JUAREZ CT

BELLFLOWER CT

CANYON CT

W LAS PALMAS AVE
E ST
N 6TH ST

HORIZON LN

OASIS LN

PORTRAIT LN
OASIS

NOSTALGIA AVE

MIRROR CT

ECHO CT

ILLUSION CT
§¨¦5
T.W. Patterson
Sports
Complex
Apricot Valley
Elementary
Creekside
Middle School Patterson High School Las Palmas
School
Northmead
School
Catholic School
Sacred Heart
Patterson
Community
Center & Pool
Lake
Walnut Grove
School
Villages of Patterson
Master Development Plan

ZACHARIAS ROAD

WARD AVE

W LAS PALMAS AVE

E LAS PALMAS AVE

WALNUT AVE

OLIVE AVE

EUCALYPTUS AVE

SYCAMORE AVE
Cal Trans /
CDF S 2ND ST
Villa Del
Lago
West Patterson
Business Park
Master
Development
Plan

SPERRY AVE

BALDWIN ROAD

ELM AVE

LEMON AVE

ORANGE AVE

ELFERS ROAD

BARTCH AVE

W MARSHALL ROAD

ROGERS ROAD

DEL PUERTO CANYON ROAD
Waste Water Treatment Plant
HIGHWAY 33
0 0.25 0.5 1
Miles
General Plan Adopted Nov. 2010
-
Legend
Agriculture Transition Areas
General Plan Area
City Limits
Sphere of Influence
Traffic Analysis Zones
Estate Residential
Low Density Residential
Medium Density Residential
High Density Residential
Downtown Residential
Mixed Use
Highway Service Commercial
Downtown Core
General Commercial
Medical Professional
Light Industrial
Heavy Industrial
Public/Quasi-Public
Parks/Open Space
Lake
Exhibit 2
Build-out Land Uses
and Traffic Zones
KEY
Future Open Space
3,100
1,000
1,000 2,000
2,700
2,600
2,100 1,300
2,300
2,100
1,700
2,600
1,400
1,800
3,400
400
1,600
4,100
700
2,000
800
500 600 200
1,300
1,000
3,000
1,800
1,100
1,500
1,500
1,900
1,500
2,200
1,600
1,300
1,500
1,200
800
1 Mile Radius
1/4 Mile Radius
Projected Population
Riverfront County Park
Open Space Corridor
Recommendation:

Every Patterson resident should be within a ¼ to ½-mile barrier-free walk of a neighborhood park.

A community park serves a broader segment of the community and is more of a “destination.” As they are developed, community parks should be distributed to provide equitable access to all parts of the Patterson community.

Recommendation:

A community park should be located within 1 to 2 miles of every resident.

Looking at projections for Patterson’s future population growth, the recommended standards will result in a network of new neighborhood parks averaging 4 acres in size, distributed throughout the future growth areas. Parkland dedicated pursuant to these standards will also allow for creation of new community parks distributed equitably through Patterson, including natural area parks and special interest parks. The following map illustrates distribution of future parks based on projected population.

8.2.a
Packet Pg. 244 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 89
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Soccer participation is increasing

5.3 SPORTS FIELD STANDARDS
Sports fields require the most dedicated acreage within the park system. Patterson has a vibrant and active sports community, with high rates of participation. Given the level of participation in field sports, and the fact that field sports facilities have the most defined space requirements, planning for sports fields is a high priority in this Master Plan. Patterson currently lacks adequate competition facilities, and overuse contributes to deteriorating conditions of the existing fields.

The sports field standards in this Master Plan distinguish between diamond fields (adult and youth baseball and softball) and rectangle fields (soccer, football, lacrosse, etc.), as well as between “game fields” and “practice fields.” The following table illustrates standards for sports fields in a number of Northern California communities, although the definition of what is counted may vary between cities.

Examples Diamond Fields Rectangle Fields
Pleasanton (incl. PUSD) 1:3,500 1:2,400
Livermore 1:2,000 1:2,000
Dublin 1:3,300 1:2,000
San Ramon 1:4,500 1:2,000
Tracy 1:2,300 1:5,000
Oakley 1:2,000 1:5,000
Salinas 1:2,500 1:2,000
Richmond 1:4,000 1:3,000
Cordova 1:2,600 1:2,100
Alameda 1:2,600 1:3,000
Table 5-3: Comparative Field Standards (2012)
Rectangle Fields
Rectangle fields are used for soccer, football, lacrosse and rugby. In Patterson, soccer and football are popular and both compete for playing space. There is a need for both practice fields and competition (“game”) fields. Currently, there is one competition field at the T.W.

Patterson Sports Complex to serve the entire City. There is some use of school facilities, but scheduling is difficult because school teams have priority over other groups. There are also 18 multi-use lawns that are suitable for practice, although 14 are located in detention basins and do not meet current ADA standards.

The dimensional standards for soccer fields vary somewhat, but in determining what should be counted as a rectangular field for the

RATIOS FOR SPORTS FIELD

STANDARDS
Sports field standards are expressed in terms of the number of residents that generate the
need for one field. These are the
ratios shown in the tables in this
sub-chapter.

As an example, “1:2,500” indicates that one field is needed for every 2,500 residents.

8.2.a
Packet Pg. 245 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 90 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Multi-field space for tournaments
purposes of meeting these standards, a “game field” is a minimum of 75 yards wide and 120 yards long, which accommodates competition soccer for ages 14 through adult as well as high-school age and adult football. Some fields of 60 yards by 100 yards (which accommodates U-14 soccer competition) may be allowed. Practice fields are a minimum of 1-acre of rectangular playable surface area.

The preferred configuration for soccer game fields is to locate multiple fields in one complex. Typically, multiple games are played simultaneously, with games scheduled throughout the day. Having fields in the same location makes it much easier for families with children playing in different age groups at the same time, and makes tournaments possible. Tournament and parking fees can also provide cost recovery.

Recommendation:

Provide 1 rectangle field per 2,500 residents, of which one half (1 per 5,000 residents) must be game fields.

RECTANGLE FIELD STANDARDS
All Fields Game Fields
Existing City Fields* 1:4,200 1:21,000
Recommended Standard 1:2,500 1:5,000
*This excludes the practice fields that are not ADA compliant. Providing ADA accessible paths to existing park basins could make 14 additional practice fields available. 2012 quantities.

By the recommended standard, the existing deficit if ADA access is provided to existing detention basin fields, is three game fields.

Diamond Fields
Diamond fields are used for adult and youth baseball and softball.

Currently, the City has two 60’ diamond game fields at the Patterson Sports Complex. The 90’ field at Garza Park, located in a basin, is not counted as it is not suitable for youth baseball, and the field is rendered unusable after the basin has been flooded. There are three practice fields, consisting of backstops at three neighborhood park multi-use lawns (at Aprigold, Floragold and Meadow Rue Parks).

Table 5-4: Rectangle Field Standards

8.2.a
Packet Pg. 246 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 91
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Practice and game fields are needed
To accommodate adult and youth baseball and softball, both skinned and turf infields, and 60’ and 90’ diamonds are needed. The preferred configuration is a “pinwheel” of four fields, which may be of different dimensions.

Recommendation:

Provide 1 diamond field per 2,500 residents, of which one half (1 per 5,000 residents) must be game fields.

DIAMOND FIELD STANDARDS
All Fields Game Fields
Existing City Fields* 1:6,000 1:10,500
Recommended Standard 1:2,500 1:5,000
*This excludes the practice fields that are not ADA compliant. Providing ADA accessible paths to existing park basins could make 4 additional practice fields available. 2012 quantities.

Table 5-5: Diamond Field Standards
By the recommended standard, if ADA access is provided to existing detention basin fields, there is a current deficit of two diamond game fields. The Patterson Joint Unified School District will be constructing a 4-diamond complex, which will help to fulfill present and future needs if a joint use agreement can be negotiated.

HOW MANY GAME FIELDS SHOULD WE HAVE?
Date Population Diamond Rectangle
2012 21,000 4 4
2022 23,000 5 5
Build-Out 66,000 13 13
Table 5-6: Game Field Standards
Parkland Distribution
While practice fields may be located in neighborhood parks, both rectangle and diamond game fields should be located in community parks.

Community parks must be designed to accommodate the acreage needed for the fields and their associated uses, such as parking, concessions, restrooms and storage areas, spectator areas, etc. The following table illustrates the approximate acreage needed to accommodate Patterson’s sports needs within the city park system. Although Patterson’s overall existing park acreage is close to the General Plan goal of 5 acres per 1,000 residents, as shown on this table, the City is deficient in community parks which can accommodate game fields.

8.2.a
Packet Pg. 247 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 92 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Community park locations (existing and proposed)

PARKLAND DISTRIBUTION
Total Acres Neighborhood
Park Acres
Community Park
Game Field Acres
Community Park Other
Use Acres
Existing 98 62 7 29*
2012 113 68 28 17
2022 120 72 35 13
Build-Out 330 198 91 41
* Including undeveloped acres at T.W. Patterson Sports Complex Existing and Proposed
Community Parks:
• T.W. Patterson Sports Complex
• Tournament Soccer Complex
• East Community Park
• Natural Parks and Trails
• Centennial Park
• North Community Park
• Historic Civic Parks

5.4 COMMUNITY PARKS AT BUILD-OUT
The following sections describe the recommended locations, criteria, and components of Patterson’s community parks at build-out. In some cases, the community parks have specific locations, such as the T.W.

Patterson Sports Complex, which is now partially built, or the Nature Parks, which are located at significant natural areas. Others, such as North Community Park and East Community Park, are indicated in

8.2.a
Packet Pg. 248 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 93
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
T.W. Patterson Sports Complex location
general locations, but include criteria such as siting adjacent to future fire stations for an official presence that will improve the sense of safety in the parks and deter unwanted activity, or locating North Community Park adjacent to the future high school to take advantage of shared facilities.

The Tournament Soccer Complex is planned at the 40-acre detention basin being constructed by Villages at Patterson. For each of these parks, the plan drawings are for illustrative purposes only, since the needs will evolve as the population changes and the park system evolves.

T.W. PATTERSON SPORTS COMPLEX COMMUNITY
PARK
The T.W. Patterson Sports Complex is the city’s primary sports facility.

Revision, expansion and completion of the master plan for this facility is a priority to Patterson’s residents and Council. The existing Master Plan for the Patterson Sports Complex contains the elements recommended for this community park. The current need for diamond fields will be met by completing the “pinwheel” which now consists of two fields. Locating an additional two rectangle fields on school district

8.2.a
Packet Pg. 249 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 94 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Lighted fields for competitive play
Sports Complex Master Plan
property at the northern boundary of the park will facilitate joint use with the future school north of the Sports Complex. The dog park will remain, as there is increasing demand for this type of facility.

Recommended components include:
• Completion of diamond field pinwheel (lighted)
• 2 practice soccer joint use fields (lighted)
• Multi-use sports field
• Dog park
• Group picnic areas with shelter
• Play areas
• Concession
• Restroom
• Additional parking

8.2.a
Packet Pg. 250 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 95
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Soccer Complex and East Community Park locations
I-5
I-5
ACCESS

DANIEL RD

SPENO DR

RENZO LN

CHESTNUT AVE

ANNAMARIE AVE

OSSIE ST
ACCESS
N 2ND ST
I-5
I-5
HWY 33
HWY 33

ELM AVE

SYCAMORE AVE

WARD AVE

FIG AVE

BALDWIN RD

OLIVE AVE

ROGERS RD

SPERRY AVE

LEMON AVE

ORANGE AVE

LOCUST AVE

WALNUT AVE

ALMOND AVE

ZACHARIAS RD

POMELO AVE

E LAS PALMAS AVE

EUCALYPTUS AVE

RAINES RD

ELFERS RD

APRICOT AVE

W MARSHALL RD

ASH AVE

MAGNOLIA AVE
N 1ST ST
M ST
I ST

BARTCH AVE

DEL PUERTO CANYON RD

DIABLO GRANDE PKWY

FRUIT AVE

E MARSHALL RD
J ST
L ST

MINNEAR RD

DONKIN RD
K ST

POMEGRANATE AVE
C ST

POPLAR AVE
N 3RD ST

S DEL PUERTO AVE
S 1ST ST

POPPY AVE
N 4TH ST
S 2ND ST
D ST
S 3RD ST
N 5TH ST
F ST

IVY AVE

SHEARWATER DR

CALVINSON PKWY
S 9TH ST
N 7TH ST
S 4TH ST
E ST
H ST

W LAS PALMAS AVE

HENLEY PKWY

ACACIA AVE

AMERICAN EAGLE AVE

N SALADO AVE
S 5TH ST
S 6TH ST

QUINCE AVE
N 9TH ST

CLOVER AVE

RED ROBIN DR

PRUNE AVE

PIPIT DR

ROADRUNNER DR

ROSE AVE

DAISY DR

N HARTLEY ST

CLIFF SWALLOW DR

OSPREY DR

PHLOX DR

FINSTER ST

KESTREL DR

MISTLETOE AVE

HOLLY AVE
S 7TH ST

WEBER AVE

CHESTNUT AVE

BERLIN WY

OLD LAS PALMAS AVE

PEREGRINE DR

WEST MAIN ST

KEYSTONE PACIFIC PKWY

DAVIS RD

BELLA FLORA LN

BARROS ST

MARIGOLD DR

GUSTAFSON AVE

HEARTLAND RANCH AVE

JAMES BURKE AVE

DAHLIA AVE

SEARS DR

JASMINE DR

LILAC AVE

TERN WY

SAMANTHA CREEK DR

PALOMINO WY

TRAINA DR

KINSHIRE WY

LORELEI LN

AZALEA DR

TYLER ST

PAINT WY

ASHWOOD LN

S AMERICAN EAGLE AVE

EIDER DR
8TH ST

MILLWOOD DR

CREEKSIDE DR
B ST

MORAY WY

ANGUS ST

SCARLET LN

IBIS DR

NUBIAN ST

PARK CENTER DR

TISSOT DR

LEVERTON DR

PINTO WY

BUCKSKIN WY

S HARTLEY ST

GARDEN PATCH WY

S EL CIRCULO

N EL CIRCULO

WALKER RANCH PKWY

FAWN LILY DR

TOGGENBURG ST

BULLFINCH DR

KEYSTONE BLV

MESA CREEK DR

LAVENDER LN

HANNAH DR

THRUSH DR

PLACER CREEK DR

MULBERRY AVE

JERSEY LN

SWEET PEA DR

MARISA DR

SKIMMER DR

SPERRY RD

MARY JANE AVE

ORKNEY DR

WIGEON LN

TULIP LN

DURER DR

NEW FOREST WY

ROXANNE DR

ROSEMARY DR

VAN GOGH LN

LEATHER CREEK LN

STARK RD

LONGHORN LN

VICKI LYNN LN

OAKWOOD LN

PERIWINKLE DR

WASHBURN ST

MACKILHAFFY DR

JAKE CREEK DR SWAN DR

MENDOCINO CREEK DR

TOYON LN

FLICKER LN

ARAMBEL DR

JEWEL FLOWER DR

PASA FELIX DR

BRAHMA ST

FALL AVE

HOLLYHOCK CI

NICASTRO DR

LEMON BLOSSOM LN

BLUE HERRON DR

COUGAR CREEK DR

MESQUITE DR

BECK CREEK LN

GREBE LN

YELLOWHAMMER DR
N 6TH ST

HUNTER CREEK DR

SQUASH CREEK LN

NORTHMEAD WY

FOUNTAIN GRASS DR
MOE DR

DOWITCHER DR

ABELIA LN

GANNET LN

GAUGIN WY

SNOW CREEK LN

SHORTHORN ST

INAUDI DR

MAYETTE ST

LOGAN WY

SUNFLOWER DR

MARGUERITE LN

WOLFPACK CT

MEGHAN DR

PARAMATTA DR

MESSER PL

DAYLILY LN

VINEYARD AVE

TOTMAN CT

EL CAMINO DR

IMPERIAL LILY DR

CONDOR CT

WALNUT CT

HACKNEY ST

MADRONE LN

BOGDANICH WY

RIDGE CREEK LN

MORNING GLORY DR

PITSCOTTIE LN

CHESTERFIELD DR

MIRAGGIO DR

STEEL CREEK DR

BENNETT DR

BRANGUS LN

BLUE FLAX DR

TARLAND LN

DYLAN CREEK DR

MORAY CT

SWEETWOOD LN

THOROUGHBRED ST

SPOONER CT

LOLA LN

HILLSTOCK CT

CHERRY BLOSSOM LN

KNUTSON ST

KINGFISHER DR

SPRING AVE

BEAVER CREEK DR

AMBERINA DR

FRANQUETTE ST

WESTFIELD PL

BERRENDAS ST

INAUDI CT

TYLER CT

PAYNE ST

WOOD CREEK DR

NOBLE PARK CI

S SALADO AVE

SWEET BRIAR DR
PLAZA

HAMMON CT

CHASE ST

PINE CREEK LN

STONE CREEK LN

ORCHID LN

ANGORA ST
GITY

CORNFLOWER DR

BERTWOOD LN

N DEL PUERTO AVE

LA LYNN DR

KINGLET LN

SANDERLING DR

BEACHWOOD LN

BROOK HOLLOW DR

SUMMER PHLOX LN

GOLD CREEK DR

WANZIA LN

SUSAN ST

BLACK CROW LN

SPANISH BARB WY

TENBRINK LN

TEAL CT

WARBLER LN

MARSH WREN CT

CARLY CREEK DR

CABANEL WY

KLOPPING CT

DELPHIA DR

GNESA DR

ZINNIA CT

AMBERINA CT

DARPINO CT

MEADOW CREEK DR

TORVEND WY

STONECHAT LN

GOLDFINCH LN

WESTFIELD LN

DEER HOLLOW DR

SNAKE CREEK DR

WINTER LN

PEACH BLOSSOM LN

ROCK CREEK LN

DE LASH CT

SUMMER LN

CABANEL LN

SPARROW HAWK LN

HANSEN CT

SORREL CT

ARABIAN WY

ROGERS CT

HYACINTH DR

HALLEY CT

SAFFRON WY

BONNEAU CT

GUERNSEY ST

EMILY CT

GARDENIA CT

MERTZ CT

MAC DUFF WY

WANZIA CT

CURLEW CT

ITTURRERIA DR
ACCESS

SUNSET CT

KIRKWALL WY

TROUT CREEK LN

HOFFMAN CT

SHIRLINDA WY

TUSCANY CT

PUFFIN CT SIERRA CREEK CT

DAMARA CT

ANEMONE CT

CHARBRAY CT
ALPINE CREEK DR.

TIREE PL

DEMSEY CT

SHETLAND WY

AMADOR CREEK LN

CHESTERFIELD CT

NORDELL PL

JUAREZ CT

BELLFLOWER CT

TERSK CT

CANYON CT

W LAS PALMAS AVE
E ST
N 6TH ST

HORIZON LN

OASIS LN

PORTRAIT LN
OASIS

NOSTALGIA AVE

MIRROR CT ECHO CT

ILLUSION CT
T.W. Patterson
Sports
Complex
Apricot Valley
Elementary
Creekside
Middle School Patterson High School Las Palmas
School
Northmead
School
Catholic School
Sacred Heart
Patterson
Community
Center & Pool
Lake
Walnut Grove
School
Villages of Patterson
Master Development Plan

ZACHARIAS ROAD

WARD AVE

W LAS PALMAS AVE

E LAS PALMAS AVE

WALNUT AVE

OLIVE AVE

EUCALYPTUS AVE

SYCAMORE AVE
S 2ND ST
Cal Trans /
CDF
Villa Del
Lago
West Patterson
Business Park
Master
Development
Plan

SPERRY AVE

BALDWIN ROAD

ELM AVE

LEMON AVE

ORANGE AVE

ELFERS ROAD

BARTCH AVE

W MARSHALL ROAD

ROGERS ROAD

DEL PUERTO CANYON ROAD
Waste Water Treatment Plant
HIGHWAY 33
General Plan Adopted Nov. 2010
0 0.25 0.5 1
Miles
City Limits
Sphere of Influence
Agriculture Transition Areas
Community Parks
Residential
Non-Residential
Public/Quasi-Public
Parks/Open Space
Lake
Class I Path (existing & potential)
Future Open Space
Service Area 1 Mile Radius
East Community Park (alts)
Soccer Complex /
Detention Basin

SOCCER COMPLEX AND EAST COMMUNITY PARK
At Patterson’s projected build-out population of 66,000, there will be a need for 13 rectangle competition fields.

A complex that could accommodate regional soccer/football tournaments would provide not only recreation for Patterson’s youth and adults, but would also generate significant economic activity for the City of Patterson. Tournament facilities bring recognition to their communities, and can draw 1,000’s of visitors to the city on a tournament day/weekend. Soccer tournaments draw participants from the entire region, and potentially from the entire state. Players often have more than one game, meaning that the families patronize the local businesses to purchase meals and snacks, and perhaps stay in local hotels. The youth football community hosts three tournaments each year (play-offs, Super bowl and all-stars). Currently, the economic activity

8.2.a
Packet Pg. 251 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 96 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Access between fields
and taxes generated from soccer/football tournament use are going to Turlock, Ceres, Morgan Hill, Dublin, Mariposa, Ripon and other towns with tournament facilities. On tournament weekends, teams, families and fans from throughout the region patronize local lodgings and restaurants from Friday through Sunday.

Many of Patterson’s youth participate in recreational and competition soccer, and the number is expanding. The city owns only one soccer field suitable for competition, and has no tournament facility at all.

Soccer practice could still occur in neighborhood parks and at the Patterson Sports Complex on Ward Avenue, but the Sports Complex is also needed for Patterson’s ever growing baseball and softball program, which served approximately 450 youth participants in 2012. The Patterson Sports Complex is currently beyond capacity for field use due to all the competing demands.

SOCCER COMPLEX / DETENTION BASIN
With development of The Villages at Patterson, a 40-acre City-owned site at the northeast corner of Olive and Sycamore Avenues will be developed as joint use detention basin and soccer complex. The basin functions will be completed in the first phase of this project, and the soccer fields and amenities are planned to be constructed in a later phase.

The illustrative plan that follows shows 6 adult full-sized soccer fields and 8 youth fields, along with parking and picnic areas. Soccer fields would be within the detention basin. In a storm event, the basin will hold stormwater, and will be designed to drain within 48 hours. Valley gutters would be needed to facilitate stormwater drainage around the fields. The amenities that could be located at field level would be limited. Picnic, parking and structures such as restrooms and concessions would need to be located out of detention area. Permanent bleachers or football goal posts would not be suitable. An ADA accessible path will need to be provided to the field level.

8.2.a
Packet Pg. 252 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 97
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Illustrative Soccer Complex/Detention Basin
Lighted fields for competetive play

EAST COMMUNITY PARK
Future purchase of additional adjacent or nearby land would allow for expansion to accommodate additional soccer fields, and/or football fields with bleachers and goalposts. Above the basin floor, synthetic turf could extend the time that the fields are playable. Such an expansion beyond the detention basin could serve as the community park for current and future residents of the eastern side of Patterson. It would allow for additional concessions/restrooms, parking, maintenance storage facilities, and supporting amenities for the soccer complex.

The eastern side of town currently lacks adequate parks, and residents must cross Highway 33 and the railroad tracks to access other community facilities. In order to achieve a more equitable distribution of park features and facilities, the East Community Park should contain

8.2.a
Packet Pg. 253 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 98 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
facilities such as a second community center or multi-use building, a water feature, and sports courts and fields. There are several potential locations for the East Community Park. If located adjacent to the soccer complex/detention basin, it would form an integrated soccer complex with complementary amenities. If located adjacent to the future fire station planned for the area near Walnut Avenue and Sycamore Avenue, an official presence would increase security at the park. This could also allow for co-location with Walnut Grove Middle School, to take advantage of joint use of facilities. (There is currently joint ownership of the community gymnasium located at the school. Through a use agreement, the City maintains use of the gym during evening and weekend hours). There is also the potential for co-location with a detention basin, with tiered design to allow for usable park space.

Illustrative East Community Park Uses recommended for East Community Park include:
• Diamond fields
• Soccer/football fields
• Community center
• Water feature
• Indoor courts or outdoor lighted courts
• Skate / BMX area
• Concessions
• Restrooms
• Group picnic
• Playground
• Parking
Spray park

8.2.a
Packet Pg. 254 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 99
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Natural Parks and Trails locations

NATURAL PARKS AND TRAILS
As Patterson becomes more urban, access to natural areas and habitat, and to the open space experience, become more valuable. Nature parks connect people with their surroundings. They are places of exploration and discovery of the natural world. During the COVID-19 pandemic, many people turned to their local parks and natural open spaces as a respite.

The Del Puerto Creek Corridor is a central element of Patterson’s natural history and identity. It can be preserved and enhanced to improve habitat value as well as stormwater management, and become an integral part of Patterson’s trail network. The water district’s proposed dam project west of Interstate 5 may result in a mitigation requirement to maintain continual water release into Del Puerto Creek, thus recreating a riparian corridor. A multi-use trail along this corridor would provide recreational and educational value, as well as a non motorized Educational opportunities

8.2.a
Packet Pg. 255 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 100 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Natural area west of I-5
Outdoor amphitheater for events
Equestrians on the trail
connectivity. The soils along the Del Puerto Creek corridor provide moderate infiltration, aiding in groundwater recharge if allowed to remain pervious. This makes it an ideal location for a natural open space with an expansive trail network.

The western portion of the Del Puerto Creek Corridor passes through areas of historic as well as natural significance, and could support an equestrian staging area. The topography and surroundings in this area also make it an ideal location for an outdoor performance venue.

Lights, noise and traffic would not impact residential areas, and vehicular access would be convenient.

Although the San Joaquin River is outside of Patterson’s City Limits and the General Plan Study Area, portions of the adjacent land are owned by the City, and a riverfront trail with water access could be accomplished as a joint project with the County.

Both of these corridors will form important parts of an overall trail system providing walking, jogging and cycling alternatives to Patterson’s streets. The major canals and Patterson’s irrigation laterals provide opportunities for expansion of the recreational trail system.

As development occurs along these corridors, care must be taken to maintain good visual access to these off-road trails.

Features appropriate to Patterson’s Natural Parks include:
• Trails
• Picnic areas
• Water access
• Interpretive displays
• Habitat protection areas
• Amphitheater
• Parking
• Equestrian staging area

8.2.a
Packet Pg. 256 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 101
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Spaces for community gatherings
Community Center Complex and Centennial Park locations

CENTENNIAL PARK AND COMMUNITY CENTER

COMPLEX
Centennial Park and Patterson’s Community Center Complex will provide community serving facilities, outdoor recreation, and community gathering spaces. Patterson’s civic core is expanding eastward, anchored by the historic town center on the east and the Community Center Complex and schools at the western end of West Las Palmas Avenue. Centennial Park, between Patterson High School and the Community Center will further activate the area with complimentary uses. An integrated Master Plan for the expansion of the Community Center Complex and Aquatic Center, and creation of the new Centennial Park was created in 2019. The plan includes a Community Recreation Center with a gym, workout room, dance studio, teen center, and recreation department offices. The expanded aquatics center will better serve a range of users by adding a splash pad, exercise pool, wading pool, and picnic area. Other outdoor additions include bocce courts and an outdoor patio. The Master Plan develops Centennial Park with active and passive outdoor uses including a playground, tennis, bas8.2.a Packet Pg. 257 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 102 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Amphitheater
ketball, bocce, community gardens, picnic areas, as well as an outdoor amphitheater. An additional community center with an auditorium, event space and meeting rooms will complement the recreation center across the way. The 2,600 square foot theater could be used by the High School as well as by Patterson Repertory Theater or other civic groups. Shared parking could relieve the current shortage at the High School, and be available for recreational users during non-school periods. The 2.5 acre detention basin proposed for this location can be sensitively designed and tiered for ADA accessibility, and is incorporated into the design as informal lawn.

It is recommended that the Master Plan for the Community Center Complex, Aquatic Center and Centennial Park be implemented as funding becomes available.

Conceptual Plan for Centennial Park / Master Plan for Community Center Open Space/Outdoor
Amphitheater
Community
Center
Recreation
Center Aquatic
Center
Stormwater
Retention Basin
Theater

8.2.a
Packet Pg. 258 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 103
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Potential joint use facilities
I-5
I-5
ACCESS

DANIEL RD

SPENO DR

RENZO LN

CHESTNUT AVE

ANNAMARIE AVE

OSSIE ST
ACCESS
N 2ND ST
I-5
I-5
HWY 33
HWY 33

ELM AVE

SYCAMORE AVE

WARD AVE

FIG AVE

BALDWIN RD

OLIVE AVE

ROGERS RD

SPERRY AVE

LEMON AVE

ORANGE AVE

LOCUST AVE

WALNUT AVE

ALMOND AVE

ZACHARIAS RD

POMELO AVE

E LAS PALMAS AVE

EUCALYPTUS AVE

RAINES RD

ELFERS RD

APRICOT AVE

W MARSHALL RD

ASH AVE

MAGNOLIA AVE
N 1ST ST
M ST
I ST

BARTCH AVE

DEL PUERTO CANYON RD

DIABLO GRANDE PKWY

FRUIT AVE

E MARSHALL RD
J ST
L ST

MINNEAR RD

DONKIN RD
K ST

POMEGRANATE AVE
C ST

POPLAR AVE
N 3RD ST

S DEL PUERTO AVE
S 1ST ST

POPPY AVE
N 4TH ST
S 2ND ST
D ST
S 3RD ST
N 5TH ST
F ST

IVY AVE

SHEARWATER DR

CALVINSON PKWY
S 9TH ST
N 7TH ST
S 4TH ST
E ST
H ST

W LAS PALMAS AVE

HENLEY PKWY

ACACIA AVE

AMERICAN EAGLE AVE

N SALADO AVE
S 5TH ST
S 6TH ST

QUINCE AVE
N 9TH ST

CLOVER AVE

RED ROBIN DR

PRUNE AVE

PIPIT DR

ROADRUNNER DR

ROSE AVE

DAISY DR

N HARTLEY ST

CLIFF SWALLOW DR

OSPREY DR

PHLOX DR

FINSTER ST

KESTREL DR

MISTLETOE AVE

HOLLY AVE
S 7TH ST

WEBER AVE

CHESTNUT AVE

BERLIN WY

OLD LAS PALMAS AVE

PEREGRINE DR

WEST MAIN ST

KEYSTONE PACIFIC PKWY

DAVIS RD

BELLA FLORA LN

BARROS ST

MARIGOLD DR

GUSTAFSON AVE

HEARTLAND RANCH AVE

JAMES BURKE AVE

DAHLIA AVE

SEARS DR

JASMINE DR

LILAC AVE

TERN WY

SAMANTHA CREEK DR

PALOMINO WY

TRAINA DR

KINSHIRE WY

LORELEI LN

AZALEA DR

TYLER ST

PAINT WY

ASHWOOD LN

S AMERICAN EAGLE AVE

EIDER DR
8TH ST

MILLWOOD DR

CREEKSIDE DR
B ST

MORAY WY

ANGUS ST

SCARLET LN

IBIS DR

NUBIAN ST

PARK CENTER DR

TISSOT DR

LEVERTON DR

PINTO WY

BUCKSKIN WY

S HARTLEY ST

GARDEN PATCH WY

S EL CIRCULO

N EL CIRCULO

WALKER RANCH PKWY

FAWN LILY DR

TOGGENBURG ST

BULLFINCH DR

KEYSTONE BLV

MESA CREEK DR

LAVENDER LN

HANNAH DR

THRUSH DR

PLACER CREEK DR

MULBERRY AVE

JERSEY LN

SWEET PEA DR

MARISA DR

SKIMMER DR

SPERRY RD

MARY JANE AVE

ORKNEY DR

WIGEON LN

TULIP LN

DURER DR

NEW FOREST WY

ROXANNE DR

ROSEMARY DR

VAN GOGH LN

LEATHER CREEK LN

STARK RD

LONGHORN LN

VICKI LYNN LN

OAKWOOD LN

PERIWINKLE DR

WASHBURN ST

MACKILHAFFY DR

JAKE CREEK DR SWAN DR

MENDOCINO CREEK DR

TOYON LN

FLICKER LN

ARAMBEL DR

JEWEL FLOWER DR

PASA FELIX DR

BRAHMA ST

FALL AVE

HOLLYHOCK CI

NICASTRO DR

LEMON BLOSSOM LN

BLUE HERRON DR

COUGAR CREEK DR

MESQUITE DR

BECK CREEK LN

GREBE LN

YELLOWHAMMER DR
N 6TH ST

HUNTER CREEK DR

SQUASH CREEK LN

NORTHMEAD WY

FOUNTAIN GRASS DR
MOE DR

DOWITCHER DR

ABELIA LN

GANNET LN

GAUGIN WY

SNOW CREEK LN

SHORTHORN ST

INAUDI DR

MAYETTE ST

LOGAN WY

SUNFLOWER DR

MARGUERITE LN

WOLFPACK CT

MEGHAN DR

PARAMATTA DR

MESSER PL

DAYLILY LN

VINEYARD AVE

TOTMAN CT

EL CAMINO DR

IMPERIAL LILY DR

CONDOR CT

WALNUT CT

HACKNEY ST

MADRONE LN

BOGDANICH WY

RIDGE CREEK LN

MORNING GLORY DR

PITSCOTTIE LN

CHESTERFIELD DR

MIRAGGIO DR

STEEL CREEK DR

BENNETT DR

BRANGUS LN

BLUE FLAX DR

TARLAND LN

DYLAN CREEK DR

MORAY CT

SWEETWOOD LN

THOROUGHBRED ST

SPOONER CT

LOLA LN

HILLSTOCK CT

CHERRY BLOSSOM LN

KNUTSON ST

KINGFISHER DR

SPRING AVE

BEAVER CREEK DR

AMBERINA DR

FRANQUETTE ST

WESTFIELD PL

BERRENDAS ST

INAUDI CT

TYLER CT

PAYNE ST

WOOD CREEK DR

NOBLE PARK CI

S SALADO AVE

SWEET BRIAR DR
PLAZA

HAMMON CT

CHASE ST

PINE CREEK LN

STONE CREEK LN

ORCHID LN

ANGORA ST
GITY

CORNFLOWER DR

BERTWOOD LN

N DEL PUERTO AVE

LA LYNN DR

KINGLET LN

SANDERLING DR

BEACHWOOD LN

BROOK HOLLOW DR

SUMMER PHLOX LN

GOLD CREEK DR

WANZIA LN

SUSAN ST

BLACK CROW LN

SPANISH BARB WY

TENBRINK LN

TEAL CT

WARBLER LN

MARSH WREN CT

CARLY CREEK DR

CABANEL WY

KLOPPING CT

DELPHIA DR

GNESA DR

ZINNIA CT

AMBERINA CT

DARPINO CT

MEADOW CREEK DR

TORVEND WY

STONECHAT LN

GOLDFINCH LN

WESTFIELD LN

DEER HOLLOW DR

SNAKE CREEK DR

WINTER LN

PEACH BLOSSOM LN

ROCK CREEK LN

DE LASH CT

SUMMER LN

CABANEL LN

SPARROW HAWK LN

HANSEN CT

SORREL CT

ARABIAN WY

ROGERS CT

HYACINTH DR

HALLEY CT

SAFFRON WY

BONNEAU CT

GUERNSEY ST

EMILY CT

GARDENIA CT

MERTZ CT

MAC DUFF WY

WANZIA CT

CURLEW CT

ITTURRERIA DR
ACCESS

SUNSET CT

KIRKWALL WY

TROUT CREEK LN

HOFFMAN CT

SHIRLINDA WY

TUSCANY CT

PUFFIN CT SIERRA CREEK CT

DAMARA CT

ANEMONE CT

CHARBRAY CT
ALPINE CREEK DR.

TIREE PL

DEMSEY CT

SHETLAND WY

AMADOR CREEK LN

CHESTERFIELD CT

NORDELL PL

JUAREZ CT

BELLFLOWER CT

TERSK CT

CANYON CT

W LAS PALMAS AVE
E ST
N 6TH ST

HORIZON LN

OASIS LN

PORTRAIT LN
OASIS

NOSTALGIA AVE

MIRROR CT ECHO CT

ILLUSION CT
T.W. Patterson
Sports
Complex
Apricot Valley
Elementary
Creekside
Middle School Patterson High School Las Palmas
School
Northmead
School
Catholic School
Sacred Heart
Patterson
Community
Center & Pool
Lake
Walnut Grove
School
Villages of Patterson
Master Development Plan

ZACHARIAS ROAD

WARD AVE

W LAS PALMAS AVE

E LAS PALMAS AVE

WALNUT AVE

OLIVE AVE

EUCALYPTUS AVE

SYCAMORE AVE
S 2ND ST
Cal Trans /
CDF
Villa Del
Lago
West Patterson
Business Park
Master
Development
Plan

SPERRY AVE

BALDWIN ROAD

ELM AVE

LEMON AVE

ORANGE AVE

ELFERS ROAD

BARTCH AVE

W MARSHALL ROAD

ROGERS ROAD

DEL PUERTO CANYON ROAD
Waste Water Treatment Plant
HIGHWAY 33
General Plan Adopted Nov. 2010
0 0.25 0.5 1
Miles
HS
North Community Park (alts)
KEY
City Limits
Sphere of Influence
Agriculture Transition Areas
Community Parks
Residential
Non-Residential
Public/Quasi-Public
Parks/Open Space
Lake
Class I Path (existing & potential)
Future Open Space
Service Area 1 Mile Radius
Alternate Locations for North Community Park

NORTH COMMUNITY PARK
Locating North Park adjacent to Patterson’s future second High School will provide a community park for the northern portion of town, and take advantage of opportunities for joint use of facilities such as a competition pool/aquatics facility, an indoor gym, or a lighted tennis court complex.

Recommended uses for North Community Park could include:
• Uses compatible with new High School
• Diamond field pinwheel
• Practice fields
• Multi-use community room
• Lighted tennis courts
• Lighted basketball courts
• Pool
• Concessions
• Restrooms
• Group picnic
• Parking

8.2.a
Packet Pg. 259 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 104 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
Illustrative North Community Park

8.2.a
Packet Pg. 260 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 105
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Historic Civic Parks

HISTORIC CIVIC PARKS
Patterson’s town center, with its museum and historic parks is a meaningful part of Patterson’s identity. North Park and South Park (Veteran’s Memorial Park) have been the visual focal points of the historic core, and the location for Patterson’s traditional Apricot Fiesta and other events. Their historic character should be preserved and enhanced. Renovations should incorporate historic plans and a unified palette of site furnishings and paving treatments. The heritage trees are a significant visual icon for the City and should be preserved.

Renovation of the historic civic parks will contribute to the revitalization of Patterson’s downtown.

8.2.a
Packet Pg. 261 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 106 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT

IMPROVED

STREET PARKING

BBQ RACK

EDUCATIONAL KIOSK

PICNIC TABLES

LIONS CLUB LOGO
ARBOR
5-12 PLAYGROUND

RESTROOM

SHADE STRUCTURE

OPEN LAWN
2-5 PLAYGROUND

SPLASH PAD

ARTIFICIAL
TURF TYP.

ARTIFICIAL TURF TYP.

EX. DECIDUOUS TREE TYP.

EX. PALM TREE TYP.

EX. EVERGREEN TREE TYP.

CONCRETE PAD
EX.

Patterson’s Ties to it Roots
The West Side has always been known for its spectacular scenery, wildlife, and farming. This concept celebrates that natural environment and agricultural heritage through aesthetic, play value and material use. The playgrounds and surrounding materials will be reflective of agriculture through themed play elements, historic forms and shapes, and colorful animal features. The splash pad, will provide interest and play value, while also highlighting the amazing role water has played in the history of the City. The versatility of the park will allow kids free exploration into the properties of physics and science, with the option for active recreation with water, plants and stone.

CLEANING

ED PLAY ITEMS

LIMBERS

PICNIC TABLES

AYGROUNDS
PARK CONCEPT 2a - PATTERSON, CA
North Park Concept
Existing North Park
A conceptual plan has been developed for renovation of North Park, and is shown below. Proposed improvements include:
• Playgrounds
• Splash pad
• Educational kiosk
• New picnic area, shelter, and restroom
Overall recommendations for the Historic Civic Parks include:
• Continue to preserve and enhance the museum
• Maintain and improve event space
• Enhance picnic shelter and facilities
• Recreate historic rose garden
• Preserve heritage trees
• Improve restrooms, concession and picnic shelter
• Improve ADA accessibility

8.2.a
Packet Pg. 262 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 107
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
Historic Civic Parks
Historic Civic Parks

8.2.a
Packet Pg. 263 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 108 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT

5.5 COMMUNITY FACILITY STANDARDS
There are no recognized national or state standards in regards to public facilities. The National Park and Recreation Association (NRPA) aggregates self-reported recreation and park service levels from jurisdiction across the nation for departments to follow. To tailor these service levels to Patterson, the following factors should be taken into consideration:
• Population
• Demographics
• Desired service levels
• Benchmarks
The Sports Management Group applied the NRPA guidelines, factors listed above, and community research to establish the recommended build-out master plan for the City of Patterson. The City of Patterson estimated population of 66,000 at build-out.

The typical public facilities in a community of a build-out of 66,000 population would include:
• Community Center
• Senior Center
• Teen Center
• Gymnasium/indoor courts
• Aquatic Center
• Community Arts Center
These facilities could be provided by the City, or in partnership with the Patterson Unified School District or non-profit organizations such as the Boys and Girls Club.

Near Term Priorities
The City of Patterson completed a community center and library master plan in December 2006 and has built several phases of the master plan, specifically the senior center, aquatics center (Phase 1) and skateboard park as well as infrastructure. Based on this investment, the completion of the plan is a priority. Completion of the aquatics center has been identified as a high priority. Completion of the community center building, with teen amenities component is a priority based on the need and desire of the City to have a permanent location for a teen

8.2.a
Packet Pg. 264 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 109
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN
center. The existing, temporary location of the teen center across the street from this site provides an easy transition into this location and maintains the integrity of the plan to consolidate teen activities with the skateboard park and resources. Completion of the Community Center would also provide a permanent location for Community Recreation Registrations.

Existing deficiencies based on current population include:
• Teen Center - the existing center is insufficient to serve the current demand and the City is actively engaged in efforts to develop a new permanent facility.
• Completion of the Community Center Master Plan
Community Center
County Library
Aquatics Center

5.6 FACILITIES AT BUILD-OUT

COMMUNITY CENTER
At build-out there will be a need for a second large Community Center of approximately 40,000 – 50,000 square feet to support a population of 66,000 residents.
• 5-7 acres of land - locate at community park
• Indoor gathering space - stage, seating for 300
• Full commercial kitchen
• Meeting/classrooms
• Conference room
• Dance/exercise room
• Birthday party room
• Children’s room
• Covered outdoor space for 50-75
• Gymnasium
• Restrooms with building will serve dual purpose for parks • Parking for a minimum of 225 cars

AQUATICS
Aquatic amenities ranked as one of the highest desired from the community. Public access for teaching, competitive/team sports and recreational swim remains in high demand. At build-out there will be a deficiency of 2 to 3 pools to achieve the NRPA recommended standard of water surface area per resident. Completion of the aquatic center

8.2.a
Packet Pg. 265 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 110 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
master plan provides for more recreational water. This will increase the opportunities for youth and families to engage in aquatics and will help to generate greater use and revenues to help offset operating costs. The recommended aquatic build-out for Patterson by NRPA guidelines is a minimum of 27,000 square feet of surface water. The current Aquatic Center has less than 6,000 s.f. Given these factors, Patterson’s future aquatics should include three additional pools to obtain 20,000+ s.f. of surface water.
• Phased plans for the current aquatics center should be completed, to provide program and operational enhancements and to contribute to the vision of an active teen and youth location. • There should be two pools in addition to the pool that will complete the Aquatics Center Master Plan. Aquatic facilities should be distributed so there is convenient access for residents. • Each site should have a different focus and character. Appropriate facilities include a 25 meter pool and a recreation pool with play/ slide features.
• Water spraygrounds should be included as aquatic features in at least two or three community parks distributed throughout the community. This amenity was ranked as very highly desirable by the community.

GYMNASIUM
The City of Patterson currently shares the indoor gymnasium space with the school district and has limited accessibility. At build-out there will be a need for three dedicated indoor sport courts, dedicated to community use to achieve a recommend planning standard of one court per 20,000 residents.
• Courts should be multi-purpose for indoor play
- Development of one court with a multi-purpose flooring material will provide facilities for indoor soccer, and also provides large indoor assembly space
- Courts may be built together as a sports venue; however, this model presents a significant building cost. To help offset future costs, features to consider for program viability might include tournament features, and exercise and/or fitness amenities • Courts may also be added to community recreation centers • Two or three courts could be added to a community center to provide synergies with programming and amenities, and create cost savings in infrastructure and operations

8.2.a
Packet Pg. 266 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 111
5 RECOMMENDATIONS
2022 DRAFT PARKS AND RECREATION MASTER PLAN

THEATER SPACE
At build-out population there will be a need for performing arts facilities for community programming and performance. The community presented a desire to have a community theater space that was flexible and with non-fixed seating for 100.
• Community playhouse such as a black box theater
• Located in Centennial Park, in proximity to high school for operation under a joint use agreement • Consider a non-profit partner to operate

COMMUNITY GATHERING SPACES
Community input displayed a strong desire for large gathering spaces, which may be used for outdoor performances and rental purposes. • Outdoor amphitheater
• Reservable picnic areas
• Consider a destination spot
• Amenities: restrooms, electricity, lights

MULTI-PURPOSE SPACE
To further encourage park use and the concept of providing spaces for community, it is recommended to distribute small recreation buildings in community parks throughout the city.
• Flexible use and utilitarian
• Program space for classes, day camps, meetings
• Convenient to users
• Community programming with partners
• Restrooms in building will serve dual purpose with park

8.2.a
Packet Pg. 267 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 112 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
5 RECOMMENDATIONS
2022 DRAFT
This page intentionally left blank

8.2.a
Packet Pg. 268 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

6. GUIDELINES

8.2.a
Packet Pg. 269 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 270 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 115
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Program for a range of user groups
Parks are expressions of values and
character
6 GUIDELINES
Public parks are an important outward reflection of a community and its values. The type, quantity, quality and visual character of parks, as well as mix of amenities provided, make a statement about what is important to a community. These guidelines will support the development of parks that draw users from a range of age groups and interests together in spaces that provide an array of possible experiences and that express the “place” in unique and interesting ways. Each park should be context-specific, taking into consideration the site’s natural, cultural and demographic conditions, in addition to program priorities. This approach is called “setting-based” park design.

Parks should also reflect safety and security design practices, as well as the City’s environmental sustainability and accessibility goals.

6.1 GENERAL PARK DESIGN GUIDELINES
Planning
• A representative range of the community should be meaningfully engaged in the design of each park.
• Park programming should consider any existing or planned nearby facilities to determine the ideal mix of uses to meet City-wide park and recreation goals and standards.
• Parks should be programmed and designed to appeal to multiple user groups from toddler to senior, and to provide both active and passive, as well as individual and group recreation opportunities • Parks shall be carefully located to enhance community livability and quality of life and should not be isolated remnant pieces of land.

Design
• Placemaking elements (e.g. landmarks, natural features, water features, thematic play, furnishings or other equipment, art, design character, etc.) should be designed into each park to create meaning and connection for the community. A variety of elements should be layered through the design and could express a range of cultural, historical, natural and mythical themes.
• Park activities and facilities should be sited in a manner which minimizes conflicts between park uses.
• Provide flexibility in park facilities to accommodate a range of activities and adaptation to growth and changing demographics over time (e.g. multi-use sports fields; open greens as amphitheaters, event spaces and informal picnic areas).
• Incorporate learning opportunities into park design.
• Parks should have clear entries and edges. Park entries should create a sense of arrival, welcoming and orienting users. 2022 DRAFT

8.2.a
Packet Pg. 271 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 116 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
Separate potentially conflicting uses
Incorporate learning opportunities
• Park signage should be bilingual, to promote use of parks by all of Patterson’s residents.
• Parks should have a unifying structure that links separate areas. • Wherever possible, highlight and strengthen connections between the park and other public spaces and community destinations. • Provide logical, integrated, safe and ADA compliant access and circulation throughout the park.
• Parks should be logically organized to provide synergistic relationships between compatible uses (e.g. group picnic near play areas). • Potentially conflicting uses and/or users should be separated (e.g. play areas and skate parks or basketball).
• Fencing, when used, should be attractive and should not detract from the aesthetic quality of the space.
• Ball fields and other sports fields and courts should be oriented to minimize wind exposure and glare from the sun.
• Provide shade for seating and picnic areas.
• Park designs should provide for logical maintenance and emergency vehicle access. • Park landscaping should be water efficient.
• The park design process should consider capital costs, as well as long-term maintenance and operations costs and logistics in the design of the park.

6.2 NEIGHBORHOOD PARKS
Neighborhood parks provide a social focus and both active and passive recreation opportunities for homes within a 1/4 to 1/2 mile radius.

They generally offer facilities geared toward individuals, families and small groups of nearby residents. They are generally not locations for formally organized sports tournaments or large group events that draw users from outside of the immediate area.

Standards
• Neighborhood parks shall be provided at a ratio of 3 acres per 1,000 population
• Neighborhood parks shall be a minimum of 3 acres in size • Service areas for neighborhood parks shall be 1/4 to 1/2 mile Neighborhood Park Design Guidelines
Neighborhood parks should be designed and programmed to provide active and passive elements for a range of users, as shown in the following illustrative examples. 2022 DRAFT

8.2.a
Packet Pg. 272 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 117
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Illustrative example of 3-acre park
Illustrative example of 5-acre park
2022 DRAFT

8.2.a
Packet Pg. 273 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 118 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
Provide physically challenging play equip- ment
Provide individual and group seating
options
A neighborhood park should include elements from each of the following categories:

Active Sports
• Multi-use turf areas that accommodate youth league soccer and baseball practice and play (field overlay may be used)
• Sport Court - basketball, tennis, pickleball, volleyball • Specialty Sport Facilities - horseshoe, handball, bocce, petanque • Active sports in neighborhood parks do not require lighting Passive Recreation
• Open turf area for informal play and relaxation
• Looped pathway systems for walking and jogging
• Benches for resting, people watching
Play Areas
• Separated play areas for pre-school (2-5 years) and school aged children (5-12 years), emphasizing physical challenge, universal accessibility, social interaction and fantasy play • Associated seating and shade for adults
• Consider water play
Picnic Areas
• Individual and/or small groups of picnic tables
• Barbeques
• Shade trees or structures
Gathering
• A neighborhood scale gathering place
• A variety of individual and small group seating areas Access
• Bike racks
• ADA accessibility
Other Features
• Landscaping and irrigation
• Educational/interpretive and art elements
• Restrooms (optional)
• Drinking fountains
• Trash and recycling receptacles
• Canine waste stations
• Information kiosk (optional)
2022 DRAFT

8.2.a
Packet Pg. 274 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 119
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Group picnic with restrooms
Provide fields suitable for competitive play

6.3 COMMUNITY PARKS
A Community Park is a large park that serves several neighborhoods, or a large portion of a city. They meet larger scale recreation needs that are not feasible at the neighborhood level, such as tournament sports and large group events. As with neighborhood parks they should be programmed to provide both active and passive recreation opportunities for a wide range of users. In some instances, a community park may be a special use park, that provides an amenity or serves a function that attracts citywide users, such as an equestrian facility or natural area.

Community Park Standards
• Community parks shall be provided at a ratio of 2 acres per 1,000 population
• Community parks shall be a minimum of 20 acres in size, except in the case of special use facilities
• Service areas for neighborhood parks shall be 1 to 2 miles Community Park Design Guidelines
A community park should incorporate the following elements:

Layout and Circulation
• A clear point of arrival or central hub from which other site elements radiate. • A hierarchical pathway system which organizes and links site elements. • Circulation system must provide adequate access for maintenance and public safety vehicles.
• Welcoming entry portals from all perimeter streets and trail interfaces.

Active Sports
• Sports Fields: Ball fields and soccer fields suitable for youth and adult practice and play and tournament facilities, as needed (bleachers, restrooms, concessions) • Sport Courts: tennis courts and basketball courts
• To the extent feasible and needed, provide synthetic surfaces and light active sports facilities to maximize potential use • Where lighting is provided for sports fields or courts, hours of operation will be regulated by the city, and light sources will be shielded to minimize light spillage to off-site locations. • Speciality Sports Facilities: horseshoes, bocce ball, petanque, handball, slack lining, cricket 2022 DRAFT

8.2.a
Packet Pg. 275 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 120 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
Passive Recreation
• Open turf area for informal play, relaxation and quiet contemplation • Looped pathway systems for walking and jogging
• Benches for rest, people watching
Play Areas
• Separated play areas for pre-school (2-5 years) and school aged children (5-12 years), emphasizing physical challenge, universal accessibility, social interaction and fantasy play • Associated seating and shade for adults
Picnic Areas
• Single and small and large group picnic areas
• Barbeques
• Shade trees or structures
• Co-locate with play areas, turf areas and restrooms
Gathering
• A civic gathering space for community events
• Multiple smaller social spaces
Access
• Bike racks
• ADA accessibility
Teen Area
• Area geared toward 12-18 year-old users, which may include • Skate park or elements
• BMX tracks
• Rope courses or climbing walls
Naturalized Areas
• Elements promoting interaction with and learning about nature, such as:
• native plant demonstration gardens
• botanical gardens or arboretums
• wildflower, butterfly, or native plant gardens
• community gardens
Community scale gathering space
Provide a teen-oriented area
2022 DRAFT

8.2.a
Packet Pg. 276 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 121
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Sustainable landscape design in parks
Consider alternative energy, e.g. photo- voltaics
Parking
• Parking to be provided at a rate appropriate to anticipated park usership
• Parking to be integral to the park and logically located • A portion of required parking may be accommodated on fronting streets
Other Elements
• Community center
• Water park
• Amphitheater
• Dog park
• Drinking fountains
• Restrooms
• Landscaping and irrigation
• Storage/maintenance areas
• Lighting for safety

6.4 SUSTAINABILITY
Environmental sustainability should be designed into all City of Patterson parks and open spaces. On a general level, the concept of sustainability refers to ensuring that the needs of the present are achieved without compromising the ability of future generations to meet their own needs. On a practical level, this means working to minimize the negative environmental impacts of the built environment, minimizing resource use and waste, and designing outdoor spaces to function like natural systems, wherever possible.

Energy Efficiency
• Use energy efficient lighting sources such as LED and/or solar powered lighting
• Minimize energy consumption by using motion detection systems that dim or shut off lighting when not needed
• Identify opportunities for use of alternative sources of energy, such as wind turbines and photovoltaics
Sustainable Landscaping
The California Water Efficient Landscape Ordinance and the California Green Building Code are state regulations that require a range of sustainable landscape design and building practices. ReScape California, is a sustainable landscaping program in Northern California that provide comprehensive guidelines for sustainable landscape design 2022 DRAFT

8.2.a
Packet Pg. 277 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 122 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
Preserve trees with historic significance
above and beyond these requirements. Its Guidelines outline landscape design and maintenance practices that support eight key principles:

1. Act Local

2. Reduce Waste

3. Nurture Soil

4. Sequester Carbon

5. Save Water

6. Conserve Energy

7. Protect Water and Air

8. Create Habitat.

These or similar guidelines should be consulted in park and open space design. At a minimum, designs should reflect the following:
• Plants should be selected and sized to allow them to grow to natural size without shearing and offhaul of plant waste • No plants listed by Cal-IPC as invasive in the area shall be specified • California native, Mediterranean or other climate adapted plants that require little or no summer water shall be specified for a minimum of 75% of all non-turf plants • Total irrigated area specified as turf is limited to a maximum of 25%, with sports or multi-use fields exempted
• Specify weather-based, automatic, self-adjusting irrigation controllers with rain and wind sensors Trees
Trees are critical components of parks. They are valued for their scenic beauty and pastoral quality, as well as a wide variety of functions, including shade provision, oxygen production, air purification, erosion control, wind protection, reduction of urban temperatures and positive impact on property values.
• Trees should be provided in abundance in parks to bring nature and natural forms into the space and to provide easy access to shade in multiple locations throughout the park.
• Trees intended for shade should be installed at a minimum of 24” box to ensure the tree serves this function within a reasonable time frame.
• Existing trees on park sites that are mature and healthy or have a unique quality or significance, such as the existing Palm trees in the historic Town Center, should be preserved wherever possible. 2022 DRAFT

8.2.a
Packet Pg. 278 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 123
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Sports fields in stormwater facilities
Detention basin soccer fields

6.5 JOINT USE DETENTION BASINS/ RECREATION

FACILITIES
In an effort to maximize the efficient use of land and funds, detention basins may be designed as dual-use recreation facilities. This allows a single facility to satisfy needs for recreation facilities, water quality, flood control and aesthetics and limits the amount of land devoted exclusively to stormwater detention. To count as a recreation facility, a detention basin must have a minimum of 1 acre of uninterrupted turf area suitable to accommodate an appropriately-sized sports field based on recognized standards, excluding the area for vegetated swales, infiltration basins or the intake area around the drain inlet. In general, passive recreational elements should be incorporated in portions of detention facilities having the greatest potential flood risk and frequency.

Active recreation elements are more suitable in areas within detention facilities having lesser degrees of flood risk and frequency. • The active recreation portion of the basin shall be appropriately graded (maximum 2% cross slope), have appropriate drains, and the side slopes of the basin shall have not more than a 6:1 slope. • Unless otherwise exempted by the City, any sports field within a detention basin shall be designed to fully drain within 48 hours of a rain event with a 100 year frequency.
2022 DRAFT

8.2.a
Packet Pg. 279 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 124 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
Orient homes to face the park
Socializing at the dog park
• The facility must be designed in accordance with applicable maintenance standards; and must conform to all applicable laws and regulations relating to stormwater detention facilities. • Parking, restrooms and other structures, light fixtures, play areas, and site furnishings should not be located in the lower tiers of the basin.
• The facility must meet ADA accessibility standards in order to be considered dual-use.

6.6 DOG PARKS
Dog parks can be a welcoming feature of a neighborhood or community park, or a stand-alone facility. They have increasingly become locations for neighbors and friends to socialize, while their dogs are exercising and socializing as well. Dog parks should be designed to minimize potential conflicts, be easily maintainable, and to provide a pleasant and healthful area for pets, their owners, and the neighboring community.

Design Considerations for Off-Leash Dog Areas
• Dog park areas should be fenced. Fencing should be a minimum of 4 feet in height, and should not allow small dogs to escape. • Provide a double-entry gate system. Locate gates away from corners of the dog park to avoid entering dogs from being cornered by other dogs rushing to greet them. Provide a second access point to allow for alternative exit route if a conflict should arise. • Separate large and small dog areas, if space allows.
• Avoid surfacing materials that may become stuck in paws, such as wood chips.
• Clearly display dog park rules and regulations.
• Provide dog waste bags and trash receptacles.
• Provide a water source for dogs and owners, and depending on surfacing materials, for maintenance of the area.
• Provide seating for owners, and shade for owners and dogs.

6.7 SAFETY AND SECURITY
Optimizing safety and security is an important component in the delivery of a comprehensive and high-quality parks and recreation system. The vitality and long-term success of the public space system in achieving health and wellness goals is strongly connected to the real and perceived safety and security of its users. Safe spaces attract legitimate users and these same users improve safety by claiming own2022 DRAFT

8.2.a
Packet Pg. 280 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 125
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Incorporate public/community art
Maintain visibility into parks
ership and acting as guardians, thus discouraging undesirable users.

Crime Prevention Through Environmental Design (CPTED) is an approach to the design of public spaces based on three closely related principles intended to reduce the opportunity for undesirable behavior and promote the prescribed, desired and acceptable uses and intended functions of a space. These are: Natural Surveillance, Natural Access Control, and Territorial Reinforcement. The following guidelines reflect CPTED principles.

Site Selection and Orientation
• Locate parks centrally within neighborhoods, allowing visibility from all sides and, wherever possible, locate parks in areas with abundant normal activity throughout the day.
• Ensure parks are easily accessible with safe pedestrian and bicycle routes, public transit, and sufficient parking, as needed, to maximize the opportunity for use. • Orient homes and businesses to face the park wherever possible. At a minimum, have windows facing the park.
• Where possible, co-locate community parks with fire stations or other public safety facilities.

Community Ownership & Involvement
• Engage the community in meaningful participation in the park design.
• Incorporate public art into park designs whenever practical as a way to connect the community with the space, express community identity and create a sense of ownership.
• Promote community involvement in park safety. Encourage “Neighborhood Watch” programs within neighborhoods to increase citizen surveillance • Organize community litter and graffiti removal events Circulation & Layout
• Locate walkways and activity nodes to maximize the opportunity for observation by neighbors and facilitate surveillance by law enforcement.
• Where appropriate, provide wayfinding that makes circulation routes to activity nodes and entry points clear so that users do not become lost and vulnerable.
2022 DRAFT

8.2.a
Packet Pg. 281 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 126 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
Use durable, low maintenance furnishings
Visibility & Lighting
• Design and maintain landscape so that the area between 24-inches and 72-inches above the ground is free of plant material that can obstruct views into and within a site.
• Carefully consider the placement and use of berms in parks so that they do not prevent surveillance or create ambush points. • Ensure walkways and activity nodes are lit to a minimum 4 foot candles. Lighting of pathways should allow for facial recognition at a distance of 60 feet and allow users to distinguish changes in grade. Light other areas, as appropriate, to allow detection of movement. Refer to Guideline on Security Lighting for People, Property and Public Spaces, Illuminating Society of North America (IESNA G-1-03). • Design lighting to avoid light trespass, which can lead neighbors to close window coverings, thereby losing the potential for natural surveillance
• Consider motion-activated lighting as a method to signal park use to observers and law enforcement and to indicate history of movement. • Provide lighting that meets safety and security needs, but that does not encourage undesired night-time use of the parks.

Fixtures, Furnishings & Amenities
• Attract intended park users by providing appealing amenities that meet a range of recreation needs for a range of users, express community identity or unique park themes, and have been selected with input from the community during the outreach process.
• Provide furnishings that discourage squatting, such as benches with separators.
• Use durable, vandal resistant and low maintenance furnishings, fixtures and planting to promote the image of cared-for environment, while minimizing maintenance costs.
• Provide skateboarding amenities to meet this recreation need and to discourage inappropriate use elsewhere.
• Use approaches such as skate stops or notching of concrete to discourage skateboarding in areas where it would conflict with other uses.
• Provide rest rooms, where feasible, to attract desirable users. Incorporate security features such as personal alarms, and automatic locks which prevent access outside of park hours.
2022 DRAFT

8.2.a
Packet Pg. 282 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 127
6 GUIDELINES

PARKS AND RECREATION MASTER PLAN
Park signage with regulations
Programs, Management & Maintenance
• Install prominent, vandal resistant, bilingual signage in all parks that includes the following:
• A clear expression of ownership of the park by the City of Patterson; • Park hours;
• Unacceptable behaviors and enforcement procedures in place; • Emergency contact information
• Implement park maintenance policies to ensure regular maintenance of parks and open spaces to include the following:
• Cleaning of litter;
• Prompt removal of graffiti;
• Maintenance of landscape to achieve visibility between the heights of 2’ and 6’ above the ground; and
• Repair of fixtures, furnishings and other equipment.
• Require dogs to be on leash at all times, except in designated areas. • Incorporate CPTED design review for all park plans submitted for approval. Create CPTED checklist for distribution to project applicants.
• Work closely with law enforcement to identify highest risk parks and coordinate crime prevention efforts.

6.8 ACCESS
As Patterson continues to develop, providing bicycle and pedestrian access to the City’s parks should be a priority. The General Plan Circulation Element articulates this in its policies related to Goal T-7: “To promote pedestrian, bicycle, and rail travel as alternatives to automobile use.” General Plan policies include provision of safe pedestrian and bike pathways, safe and convenient bike routes to recreation, and pathways in open space.

The City’s adopted Transportation Infrastructure Master Plan (began concurrently with the Parks and Recreation Master Plan in 2012, adopted in 2020), includes recommendations for encouraging walking and biking. Recommendations include that future development consider schools as important bicycle destinations, incorporating Complete Street policies and creating more continuous bike lanes at key destinations, and redesigning downtown streets based on walkable and livable principles. These steps will support access by all residents to Patterson’s parks and open spaces.
2022 DRAFT

8.2.a
Packet Pg. 283 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 128 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
6 GUIDELINES
In recent years, City began an Active Transportation Plan (ATP). The ATP’s vision is to “creat[e] a safe, connected, vibrant, and well-maintained walking and bicycling network that supports people of all ages and abilities” with the eight goals: promote walking and biking, safety, connectivity, health, equity, accessibility, environment, and implementation. In sum, the ATP recommends 41 bicycle projects and 18 pedestrian projects across the City, ranging from 8.27 miles of sidewalk to implementing bike facilities from the City’s Transportation Infrastructure Master Plan (2020). Over half of the recommended bicycle projects are bike lanes, on 11 miles of City streets. The pedestrian projects range from fixing all sidewalk gaps, new or upgraded signals, and crosswalk upgrades.

In addition to the policies and recommendations mentioned above, this Parks and Recreation Master Plan recommends improving access to parks and open spaces by:
• Including parks as “important” and “key” destinations when considering bicycle and pedestrian circulation; • Prioritizing parks and recreation facilities as well as schools as key destinations when designing Complete Streets;
• Providing a sufficient number of conveniently located bicycle racks at all parks and recreation facilities; and
• Expanding the system of multi-use paths that function as linear parks.

In Chapter 5 - Recommendations, this Master Plan defines service areas for neighborhood and community parks. It maps distribution of Community Parks, showing existing and proposed bicycle routes connecting to those parks, as well as to Natural Parks and Trails. The service area standard calls for every resident to have access to a neighborhood park within a barrier-free 5 to 10 minute walk. This aligns with the national “10-Minute Walk” movement. On its Parkserve website (parkserve.tpl.org), the Trust for Public Land has identified that 85% of Patterson’s residents are within a 10 minute walk of a park. As the City grows, park locations should continue to meet the 10-minute walk criteria.
2022 DRAFT

8.2.a
Packet Pg. 284 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

7. IMPLEMENTATION

8.2.a
Packet Pg. 285 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 286 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 131
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
This Plan presents a long term vision, to be implemented over time as Patterson’s population grows. Planning level costs have been projected for buildout, but as the Plan has a 20-year time horizon, costs, needs and development patterns will likely evolve. The plan should be periodically reviewed and updated as conditions change.

Critical to the success of this Master Plan is the ability to secure stable and ongoing funding for its implementation. This includes funds for capital improvements, as well as ongoing operations and maintenance of programs and facilities. The funding of parks and recreation is a challenge in many jurisdictions nation-wide. In California, the ability of local governments to raise additional property tax revenues was severely limited in 1978 with Proposition 13. While societal expectations of park and recreation agencies have increased across the board, economic and political conditions make dependable funding streams more and more elusive. No single funding source is likely to provide all of the resources required to fund a complete parks and recreation program. A variety of creative approaches will be required.

The first section of this chapter contains specific recommendations for next steps to implement the Master Plan. The subsequent sections provide greater detail regarding cost recovery strategies, a range of potential funding options for the City to consider, and finally, planning level cost estimates for both existing deficiencies and for build-out of the park system at Patterson’s projected population of 66,000.

7.1 NEXT STEPS:

The Master Plan is a tool that the City can use to create a park system which supports a livable, beautiful, economically sustainable community. The Master Plan should not be allowed to sit on a shelf. Rather, it should be incorporated into overall City process and be used to guide planning decisions and influence the City’s budget development process. The plan recommends the following implementation actions:

7.1.1. SYSTEMATIC INTEGRATION OF THE PARK

MASTER PLAN INTO CITY PLANNING PROCESSES
The Master Plan anticipates substantial growth in the City of Patterson, requiring a total of 198 acres of neighborhood parks and 132 acres of community park facilities to serve a population of 66,000 at build

8.2.a
Packet Pg. 287 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 132 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
out. Patterson’s growth will occur incrementally. Each new residential development will need to accommodate the recreational needs of its proposed development based on the standards and guidelines provided in the City of Patterson’s General Plan and this Parks and Recreation Master Plan. If the proposed new development is not able to accommodate park needs genereated by its population on its own property, it will need to participate in funding the City’s acquisition and development of required park land. The Master Plan identifies general new community park facilities that will be developed to meet the projected park needs. Many of the sites for these parks are not currently owned by the City. To ensure that the community parks are in the appropriate locations and create positive relationships with adjacent land uses, the City needs to specifically identify the locations for future community parks. Finalizing the selection of community park sites is especially important where multiple options have been identified in the Master Plan or the property is not currently zoned or identified as a park site in General Plan.

RECOMMENDATIONS:

1. Identify targeted areas for community parks and document those locations in General Plan and other planning documents.

2. Develop a process to include the Recreation and Community Services Department, and the Parks Maintenance Division in the final selection of neighborhood park sites.

3. Develop protocols to include the Recreation and Community Services Department and the Parks Maintenance Division in updating the Park Design Guidelines (1995) and 2006 Park Design Guideline Amendments to reflect Master Plan recommendations, and in reviewing the program and design of neighborhood parks proposed for construction and dedication by the development community.

7.1.2 UPDATE PARK IMPACT DEVELOPMENT FEES
Use of Quimby Act dedication and development impact fees are the primary mechanism to provide the parks and recreation facilities for new development. These funding mechanisms are described further in Section 7.7 of this chapter. Current impact fees do not reflect the costs to construct the community and neighborhood parks required to meet the standards set forth in the City’s General Plan and this Parks and Recreation Master Plan to serve future residents.

8.2.a
Packet Pg. 288 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 133
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
RECOMMENDATIONS:

1. Undertake adjustments to current impact and Quimby Act fees based on the Parks and Recreation Master Plan and projected facility costs. Planning level cost estimates and suggested development fees are included in Section 7.10 of this Chapter.

2. Review impact fees in a timely manner and periodically adjust for inflation to ensure that deficiencies are not created by the gap between project costs and the current impact fee.

3. Look at opportunities to require park fees for non-residential development through a comprehensive nexus study looking at the benefits contributed by the park system to a healthy workforce and livable, economically sustainable community.

7.1.3 DEVELOP A STRATEGY FOR ADDRESSING

EXISTING DEFICIENCIES
Project prioritization should be linked with a 5-year Capital Improvement Plan (CIP), providing clear guidance on which projects to undertake each year and on the accumulation of funds over multiple years to address larger projects. Community endorsement and reliance on the CIP will avoid continuing conflicts between competing interests.

There are many projects seeking funding through the General Fund.

The Master Plan identifies a number of potential strategies to fund the acquisition and development of the park system.

Development impact fees will not address the existing deficiencies in park acreage, sports and community facilities. The funding for these facilities will need to be addressed via General Fund, grants, special financing districts or bonds. Cost recovery through user fees is typically only used to offset maintenance and operations costs. Special financing districts and bonds require a public vote and typically would be associated with a specific project for which there is strong support in the community. All of these mechanisms are described more fully in subsequent sections of this chapter.

PROJECT PRIORITIZATION
Currently the General Fund is the most likely source of funds to address deficiencies. Community support of the prioritization of individual projects is critical. To achieve this endorsement, the prioritization of park expenditures should be done in a public forum. With limited resources; expenditures and benefits must be carefully weighed, and the overall benefit of each park project must be analyzed. Potential

8.2.a
Packet Pg. 289 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 134 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
project priorities must also be evaluated in light of potential targeted sources of funding or collaborative efforts. Prioritization should consider need, return on investment, and implications on maintenance and operations budgets. Establishing weighted criteria for evaluating potential projects will create a systematic approach to prioritization.

Possible criteria to be considered might include:
• PUBLIC HEALTH & SAFETY
• Does the project correct conditions that are hazards or code violations (e.g. unsafe equipment, fire hazard)?
• Does it provide safety and security for the users and property (e.g. visibility, lighting, etc.)?
• Does it correct ADA deficiencies?
• ADDRESS EXISTING DEFICIENCY
• Does the project improve or expand facilities for an underserved neighborhood?
• Does it improve potential for programs and services for at-risk youth?
• Does it provide facilities or elements that are lacking in the community? (e.g. tournament soccer facility, sports field, black box theater)
• Does it preserve, improve or enhance cultural, historical or natural resources?
• PROTECTION OF INFRASTRUCTURE / MAINTENANCE

EFFICIENCIES
• Does the project preserve the integrity of the City’s existing park infrastructure?
• Does it provide major repairs/renovations to an existing facility? • Does it provide minor repairs/renovations to an existing facility? • Do improvements reduce ongoing maintenance costs?
• COMMUNITY SUPPORT
• Does the project have demonstrated support from the community? • Has there been significant community input expressing the need for the project?
• Does it provide greater access to recreation facilities for a segment of community? • COLLABORATIVE OPPORTUNITIES AND FUNDING

AVAILABILITY
• Do improvements generate increased revenues for the City?

8.2.a
Packet Pg. 290 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 135
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
• Is City funding available?
• Is grant funding available?
• Is joint use or collaboration possible with outside public agencies (e.g. School District, Sports Group Alliance, Rotary, Stanislaus County)?
• Will it provide collaborative opportunities with non-profit organizations? Acquisition of parkland and the funding for development of new facilities will take time. This is especially true for community parks where the funds to acquire and develop facilities will be accumulated over many years. To address deficiencies, joint use of facilities may present more immediate and cost effective methods of providing interim recreation amenities.

RECOMMENDATIONS:

4. Work with pending developments as part of the planning process to ensure acquisition of parkland and the development of new facilities.

5. Negotiate Memoranda of Understanding (“MOUs”) with the School District to provide public access to existing recreation facilities or improvement of interim sports fields on school property.

6. Develop an “alliance” of sports user groups to act as a unified voice when scheduling existing fields, collaborating with School District on joint use, and developing City CIP priorities.

7. Develop a community endorsed Capital Improvement Program (CIP) which outlines how General Funds will be allocated during each cycle to address park deficiencies. Review and update the CIP regularly in a public forum (e.g. Parks, Recreation and Beautification Commission, or City Council meeting). Elements needed to address existing deficiencies are identified in Section 7.11 of this Chapter.

8. Prioritize potential community park sites for future acquisition by the City.

9. Explore opportunities to work in partnership with Stanislaus County to acquire, develop and manage park land.

8.2.a
Packet Pg. 291 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 136 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION

7.1.4 DEVELOP A STABLE SOURCE OF REVENUE TO

MAINTAIN EXISTING PARKS AND FACILITIES,

INCLUDING LIFECYCLE REPLACEMENT COSTS
Maintenance and operations are essential for a functional, inviting and attractive park system. Basic maintenance costs include personnel costs for tasks such as replacing light bulbs, cleaning gutters, trash removal, carpet cleaning, window washing, mowing turf, pruning trees, weeding, upkeep of irrigation systems, etc. Operations costs also include water and electricity charges. Life-cycle costs, such as routine replacement of elements such as carpets, furnishings, play structures, court surfacing, field turf, irrigation, etc., must be included in ongoing maintenance projections.

Currently, maintenance funding through many of the existing assessment districts does cover all the costs associated with facility operations and maintenance. Maintenance of the older parks is funded through the General Fund. As new parkland is added, operations and maintenance costs increase. An accepted guideline for staffing levels is an additional one full-time employee for each 15 acres of new parkland. Assessment district rates in new developments must reflect current maintenance costs, and must contain escalation provisions to account for future increases. Because the parks in older districts have been underfunded and General Fund parks have limited available funding, the City currently operates a two-tiered maintenance program. Newer parks, funded by recent assessment districts, receive a higher level of maintenance than do the older parks operating under the General Fund or underfunded assessment districts.

RECOMMENDATIONS

1. Evaluate cost recovery opportunities associated with various programs and facilities. (See Section 7.2)

2. Explore return on investment associated with upgrading with available energy efficient technology.

3. Form Citywide or additional local Special Financing Districts to provide an ongoing funding stream for park maintenance and operations. (See Section 7.4)

4. Develop a segregated capital reinvestment fund within the City’s General Fund to support life-cycle replacements.

5. Develop a segregated account for user fees, concession charges, and other revenues generated from the parks, for reinvestment in maintenance of the parks.

8.2.a
Packet Pg. 292 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 137
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN

6. Seek out and encourage the provision of volunteer assistance and stewardship from civic organizations, special interest groups, and individuals, to reinforce a sense of park ownership. (See Section

7.8)

7.2 COST RECOVERY AND SUBSIDY ANALYSIS
The reality of increasing expectations of park and recreation agencies, combined with tightening budgets necessitates careful analysis of the services that can be provided to residents and at what cost. A range of factors should be considered when developing a cost recovery and subsidy approach. The Pyramid Methodology developed by GreenPlay LLC, assists in categorizing services along a continuum of relative community versus individual benefit.

Facilities, programs and other services are placed within one of these categories, considering factors including:
• Is there a legal or other obligation to provide the service? • Who receives benefit?
• Is it a core value of the agency to provide the service? • Is participation restricted?
• Is there a public expectation to provide the service? • Are there other (private, non-profit) service providers? The current facilities and program provided by the Patterson Recreation and Community Services Department have been categorized here, based on community outreach, staff and Steering Committee input and the results of the needs assessment.

8.2.a
Packet Pg. 293 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 138 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
Mostly Community Benefit
These are services that have a general benefit to the community. They are generally paid for through taxes and are therefore available to all residents for little or no fee. They may increase property values, provide safety, address social needs, and enhance quality of life. It is assumed that these services are funded through General Fund Allocations, Development Impact Fees or Dedication, grants or other sources not requiring direct user fees from the public. • provision of parks, opens spaces and trails, including • sports fields, practice / game
• play areas
• court sports (tennis, basketball, volleyball)
• picnic areas (some picnic areas may also be made available through reservations with an associated fee)
• shade structures and trees
• spray parks
• dog parks
• skate parks
• restrooms in public parks
• drinking fountains in public parks
• public trails and bikeways
• public opens spaces, natural areas, gardens
• park, open space and trails maintenance
Considerable Community Benefit
These services promote individual physical health and mental well-being and may provide some skills development. These are generally programs that are expected by the community or are at beginner instructional levels. Costs are partially offset by a tax subsidy to account for the degree of community benefit with the remainder covered by fees calculated as a percentage of costs. Scholarships or tiered fee structures may be made available to ensure access for low income residents. • multi-generational community centers offering introductory programs, such as:
• preschool programs
• active adult and senior programs - Hammon Senior Center Programs • aquatics admission, aerobics and diving classes, swim lessons • introductory sports instruction - Youth, Flag Football, martial arts, swim lessons, teen programs - Patterson Youth Action Commission

8.2.a
Packet Pg. 294 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 139
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
• health and wellness programs
• academic/employment related programs
• arts programs - dance, music
Individual/Community Benefit (Balanced Beneficiaries)
This category captures services providing programs that promote individual physical and mental well-being at an intermediate level of skill development therefore catering to a smaller group of the population.

Fees would be expected to recapture a greater percentage of cost than services of greater general benefit.
• summer day camps
• sports leagues and teams - Swim team, Patterson Recreation Youth sports leagues
• intermediate level instruction programs in art, dance, music, martial arts
Considerable Individual Benefit
These services generally meet the needs of a smaller subset of the population with specialized interests, a high level of skill or a competitive focus. Such services may seek to recover full costs, both direct and indirect.
• specialty classes
• golf
Mostly Individual Benefit
These services generally fall outside of the core mission of the Parks and Recreation Department and may also be available in the private sector. Such services may be priced to bring in a profit as well as recover all direct and indirect costs. Such services may include:
• elite teams - Patterson Recreation Youth Soccer competition teams, Tigers All-Stars
• highly specialized instruction
• event facility rentals -e.g. Patterson Aquatic Center Birthday Party Packages

7.3 GENERAL FUND
The General Funds of local governments are comprised primarily of tax dollars, intergovernmental revenues and user fees and charges.

Parks and Recreation is just one of the many local government services competing for limited General Fund dollars. General Fund allocations can support parks and recreation improvements and services that rep8.2.a Packet Pg. 295 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 140 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
resent general benefit to all citizens of the jurisdiction. An advantage to General Fund allocations is that they are unrestricted, however City budgets are often strained to support public safety, public works and all other local government services, as well as parks and recreation. As a result funds are often less than adequate to fund a full program. Budgets can vary widely from year to year, potentially leaving programs and maintenance underfunded. This clearly points to the need for dedicated funding sources, such as special financing districts, for parks operations and maintenance.

7.4 SPECIAL FINANCING DISTRICTS (SFD)
Special Taxes and Special Assessments are two types of special financing districts (SFDs). They are property-based revenue mechanisms used by local governments to finance projects, maintenance or services. They are valued as focused local sources of funding with direct accountability, i.e. those who benefit from the service or infrastructure are those who pay. In general, it is assumed that the beneficiary of any improvements should pay in proportion to their property benefit.

In determining the appropriateness of an SFD the following issues should be carefully considered:
• Fairness and equity
• Market sensitivity
• Potential for approval
• Timing and predictability of revenues and expenses (and need for debt)
• Legal perspective
Specialized professionals including Special Tax Consultants, Public Relations Professionals, Financial Advisors, Underwriters, Attorneys or Bond Counsels can be engaged to facilitate the creation and success of a new SFD.

Landscape Maintenance Districts (LMDs)
Special assessments are charges levied against a parcel of land for the benefit that is generated by the underlying public service or improvement project. Examples are Landscape Maintenance Districts used to pay for annual maintenance costs of a park. The governing body of the entity levying the Assessment must make a finding of Special Benefit in order to validate this process. Special Benefit is defined as “a particular and distinct benefit over and above general benefits conferred on

8.2.a
Packet Pg. 296 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 141
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
real property located in the district or to the public at large”. General benefit is available to the public, and therefore cannot be charged to property owners.

These districts are typically formed to fund maintenance of neighborhood parks serving the neighborhood being assessed. Examples of LMDs in Patterson include Heartland Ranch, Walker Ranch, Patterson Gardens, and Sutter Pointe LMDs.

Mello-Roos Community Facilities Districts
A Special Tax is a financial charge that is levied annually on a property for a defined period of years. The Special Tax is calculated via some type of formula or, in the case of a Community Facilities District, a Rate and Method of Apportionment. A Community Facilities District (CFD) is a common type of Special Tax District used for funding ongoing maintenance services, capital projects, or both. It is allowed under the Mello-Roos Community Facilities Act of 1982 and is found in California Government Code Section 53311 et seq. Per Proposition 13, any new Special Taxes must be approved by a two-thirds vote.

Accountability measures designed into the Special Tax may enhance the likelihood that voters will approve a tax. These might include a citizen’s oversight committee or a sunset clause (a date by which the tax expires).

Examples of facilities with capital costs (but not ongoing maintenance costs) funded by Mello Roos Districts include Patterson Aquatics Center, Hammon Senior Center, and the Patterson Skate Park.

Enhanced Infrastructure Financing Districts (EIFD)
New legislation allows the use of Tax Increment Financing (TIF). The inrease in tax revenues generated by development maybe used to repay bonds issued to fund community investment projects such as Parks.

7.5 GENERAL OBLIGATION BOND
General obligation bonds are paid by an earmarked increase in property tax above the one percent mandated by Proposition 13. Referred to as “property tax overrides”, they require a 2/3 voter approval and usually appear on the tax bill as “voter indebtedness”. The tax is levied for a specified period of time (from 10 to 40 years). The proceeds from General Obligation Bonds can be used to finance the acquisition, construction and improvement of real property, but cannot be used to

8.2.a
Packet Pg. 297 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 142 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
pay for equipment, supplies, operations or maintenance costs. Use of such bonds has declined, due to the high approval requirement and the interest costs.

7.6 FEES AND CHARGES
With ever-increasing strain on local government budgets, user fees and charges can help maintain and even potentially expand recreation offerings. Fees and charges create a direct connection between the funding source and the beneficiary of the service. Many see this as an appropriate way to provide services. This is however a more businesslike approach to the provision of services and some argue that lower income groups may be at risk of being priced out of a recreation facility or program. This issue should be considered and avoided when developing a pricing system to ensure that the City is providing its core services to all citizens. Current examples include youth sports and aquatics.

Developing a revenue policy that establishes a framework for fees and charges that local elected officials can understand and support can be a valuable tool in implementing fees and charges. This policy should consider level of funding from the General Fund, residents’ average income level, comparable fees at other recreation providers, service demand and the City’s values with regard to revenue generation versus subsidies. Typical parks and recreation fees are shown on the following table.

Types of Recreation and Park Fees
Fee Type Description Examples
Entrance/
Parking
Charges to enter a developed recreation site at the
patron’s first contact with the area; the area may
contain facilities or activities for which fees are
charged
Fairgrounds, large parks, gardens,
wildlife preserves, historical areas
Admission Charges to enter a building, structure or natural chamber where entry and exit are controlled and
attendance is regulated
Arenas, museums, caverns, aquariums,
historical buildings
Programs Charges for participation in an activity Lessons, camps, classes, leagues Sales Revenues obtained from stores, gift shops, restaurants and other retail operations and from the sale of merchandise and other property.

Food and drink items, catering service,
souvenirs, firewood, film, clothing
Table 7-1: Recreation and Park Fees

8.2.a
Packet Pg. 298 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 143
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN

7.7 DEVELOPMENT RELATED FINANCING
Quimby Act Dedication and Fees
The Quimby Act (Section 66477 of the California Government Code) grants cities and counties the authority to require the dedication of land or payment of fees in lieu thereof (or a combination of both) by a new residential subdivision. The City can require such a dedication at the park land standard that was in effect at the time of adoption of the implementing ordinance, to a maximum of 5.0 acres per 1,000 population. Revenues generated through the Quimby Act cannot be used for operation or maintenance of park facilities. The park or facility must not be intended to make up an existing deficit, but must serve the new residents of the subdivision in question.

Development Impact Fees
Fees can be exacted from developers to pay for the impact that their residential development will have on existing infrastructure or in creating the need for new infrastructure such as roads or parks. Such fees are typically required as conditions of approval of a proposed development and are authorized under the city’s police powers over land use.

These fees are paid at the time of acquiring the building permit.

Fee Type Description Examples
Permit/
License
Charges for written permission to perform an
action or the authority to occupy space or use property Show permits, hunting/fishing licenses, alcohol permits, photography permits
Rental Charges for the exclusive use of tangible property of any kind
Bicycles, skates, tables, golf carts, picnic kits, horses, party rooms, cabins Facility Use Charges for the shared use of a facility Driving range, campsites, ball fields, swimming pools, ice rinks, golf course,
green fees
Special ServiceCharges for supplying extra articles, materials, activities, or services as an accommodation to the
public
Seasonal equipment, storage, night
lighting, field dragging and lining, class
materials, reservation fees, franchise
fees for league operations, electric use
fees, room set-up/tear down fees.

Table 7-1: Recreation and Park Fees (cont.)

8.2.a
Packet Pg. 299 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 144 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
Some jurisdictions now impose fees on any improvements anticipated to increase the number of residents likely to be residing in a dwelling unit, including residential additions, remodels and renovations.

Development impact fees may be reasonably exacted on new non-residential development in a City, as it may increase the daytime population resulting in additional facility users. A comprehensive nexus study should be conducted to identify such a relationship in order to justify fees on the non-residential development.

AB 1600 (California Government Code Section 66000 et seq.) requires the agency exacting the fee to do the following:
• Identify the fee’s purpose
• Identify the fee’s uses
• Establish a reasonable relationship between the fee’s use and the type of development project on which the fee is imposed • Determine whether there is a reasonable relationship between the need for the public improvement and the development project on which the fee is imposed.

Examples of Patterson facilities funded by development impact fees are the T.W. Patterson Sports Complex, and the Community Center Complex.

For suggested development fees based on land use, see Section 7.10 of this Chapter.

7.8 PARTNERSHIPS
Partnerships provide a variety of opportunities to share facilities, skills and resources, provide free or low cost labor, and supplement revenues. Potential partners range from sports groups, social service agencies, youth and church groups, to businesses, police departments and school districts.

The City of Patterson currently partners with a variety of organizations to increase opportunities for service delivery. The Westside Healthcare Advisory Taskforce is a public/private consortium of healthcare proponents on the west side of Stanislaus County and northern Merced County. The Taskforce partners with the City on programs such as Westside Walks.

8.2.a
Packet Pg. 300 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 145
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
Support Foundations & Friends Groups
Citizens can come together to create non-profit organizations to support a park or facility. They can raise money, sponsor projects and provide volunteer support. Adopt-A-Park and Adopt-A-Trail are ways for community members to support facilities that are important to them.

Clear agreements should be developed between the municipality and groups to clarify what the group is responsible for, e.g. watering, weeding, litter pick-up. Signs at the facility indicating who has “adopted” it, recognizes their contribution and creates goodwill and buy-in.

School Districts
Joint-use agreements with schools can significantly expand available recreation facilities, such as ballfields, soccer fields, gymnasiums and program classrooms. They have the potential to create synergies that benefit both parties.

Private Sector Partnerships
When approaching potential private sector partners, including program sponsorship or naming rights, it is important to present how involvement can be beneficial to them. Corporate donations to public recreation and park agencies can be advantageous because of the tax deductions and public relations benefit. Partnerships can take on a range of forms, such as:
• volunteer labor
• sharing of training and expertise
• loaned equipment (vehicles, A.V. equipment, printing) • loaned space
• donations of used furniture, supplies and equipment
• shared parking
• financial donations
• land donations
• sponsorships
• scholarships
• endowment/revolving fund
• advertising
• corporate team challenges
Details and a more comprehensive list of possibilities is contained in the Appendices.

8.2.a
Packet Pg. 301 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 146 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION

7.9 GRANTS
Grant opportunities are available to parks and recreation agencies for federal, state and county governments, as well as public and private foundations. Grants would be most likely for activities or efforts that include environmental improvements, enhance services and access to parks for underrepresented communities, or promote and support art/ drama. Projects that provide multiple benefits can increase the possibility of successful grant applications. Grants often require matching funds. A number of grants, along with money raised through a capital campaign, may be required to fund one project. Grants most often finance planning, acquisition and development of park and recreation areas and facilities. Competition for grant funding can be very intense.

It is recommended that staff responsible for grants be trained in grant writing and grant management to increase its effectiveness in identifying, applying for and securing funding.

Grants currently listed by the California Department of Parks and Recreation Office of Grants and Local Services include:
• Proposition 68
Voters approved $185 million in funding for local jurisdiction park improvements in 2018 (Part of a larger $4 billion bond known at the Parks, Environment and Water Bond, or Proposition 68). Funds will be allocated on a per capita basis and emphasize providing parks for neighborhoods who lack access to parks and nature. Applications under various categories began to be considered in 2019. The City of Patterson identified in following the state’s guidance, can seek funding on projects Master Plan such as those proposed for the natural area parks, and parks in under-served parts of the community. Renovation of the Historic Downtown Parks may be competitive for Prop. 68 funding, as may Centennial Park.
• Recreational Trails Program
This program provides funds annually for recreational trails and trails-related projects. Administered at the federal level by the Federal Highway Administration, approximately $1.7 million in annual funds for non-motorized trails are administered at the state level by the California Department of Parks and Recreation (DPR).

8.2.a
Packet Pg. 302 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 147
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
• Habitat Conservation Fund
This program allocates approximately $2 million every year to cities, counties and districts to fund nature interpretation and other non-capital outlay programs that bring urban residents into park and wildlife areas, to protect various plant and animal species or to acquire or develop wildlife corridors and trails. A 50% match is required. The Office of Grants and Local Services encourages non-profit partnerships with public agencies to enhance recreational opportunities. • Land and Water Conservation Fund
This program provides grants for the acquisition or development of outdoor recreation areas and facilities. Property acquired or developed under the program is federally protected in perpetuity for public outdoor recreation use. Grant requests of up to $3 million are encouraged, and a minimum 50% match is required. The Office of Grants and Local Services also encourages public-non-profit partnerships for this program.

Other grants are available through governmental agencies and foundations, such as the Federal Land and Water Conservation Fund, AARP Livable Communities and Kaboom.

7.10 OTHER FUNDING SOURCES
Infrastructure State Revolving Fund (ISRF)
The California Infrastructure bank program provides financing to public agencies at below market interest rates to fund a range of infrastructure projects including cost to design, construction, renovate parklands and facilities. It can also be used to aquire parkland. Financing repayments can be made through a variety of sources ncluding general fund revenues, property assessment and special taxes.

Transient Occupancy Tax (TOT)
The TOT is a tax assessed to visitors staying in all lodging establishments which in the city limits. Improvement to community park facilities, such as the development of a tournament sports facility area, create a demand for lodging and this increased revenue from hotel use.

This increase can be used as on ongoing funding source for park and recreation programs, services and maintenance.

8.2.a
Packet Pg. 303 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 148 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION

7.11 PLANNING LEVEL SUMMARY OF ANTICIPATED

PARK FACILITY COSTS AND DEVELOPMENT IMPACT
FEES
Based on identified deficiencies in existing park facilities and projected needs at City build-out, order of magnitude costs have been identified on Table 7-2. These costs provide a general sense of the funds needed over time for land and facilities. It is expected that funding for these projects will come from a variety of the funding mechanisms described in this chapter. Operations and maintenance costs have not been included here, but a general guideline is that maintenance of each 15 acres of park, requires one full-time employee. More detailed planning level costs are included in Table 7-4 at the end of this chapter.

Future Park Needs
Developers will be asked to pay for the development and maintenance of park facilities necessitated by the new populations associated with their developers. The General Plan requires new development to provide 5 park acres of developed parkland per 1,000 of new residence population; 3 acres of which should be dedicated to neighborhood facilities and 2 acres to be community level facilities.

Assuring a total construction cost estimate of $900,000 per acre for new neighborhood parks and $1,300,000 per acre for new community parks. The total cost for new park facilities improvements generated by each population increase of 1,000 is $5.3 million. Land costs are assumed at $125,000 per acre, therefore each new population of 1,000 would generate $625,000 in land acquisition costs. If land is dedicated by the developer this cost may be eliminated. The park development costs associated with the various residential types are as summarized in Table 7-3.

Non-residential land uses can also be required to pay development impact fees. This is generally done by determining the number of employees generated by each land use and assigning a percentage of park usership as compared to a resident user. This approach should be explored in a more detailed nexus study.

8.2.a
Packet Pg. 304 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 149
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
Cost Item Estimated Cost Details
Existing Deficiencies
- Additional 22 Acres Parks
• Park land Acquisition
• Community park improvements
$2,750,000
$28,600,000
Assumes $125,000 per acre
- Community Facilities
• Completion of Community & Aquatic
Center Master Plan $38,000,000
Complete Sports Park Complex $9,200,000
TOTAL EXISTING DEFICIENCIES $78,550,000
Future Park and Recreation Facilities
(Needs at Build-Out) Additional 225 Acres
of Parks
• Parkland Acquisition
• Neighborhood Park Improvements
• Community Parks
$28,125,000
$121,500,000
$117,000,000
Assuming $125,000/acre
135 acres assuming $900,000/acre
90 acres assuming $1.3 million/acre
TOTAL FUTURE PARK IMPLEMENTATION $266,625,000
• Community Facilities (new Aquatic
Center, Community Center, and Gymnasium)
$60,000,000
TOTAL FUTURE NEEDS AT BUILD-OUT $326,625,000
TOTAL PARK COSTS $297,975,000 Existing deficiencies + needs at buildout
TOTAL PARK FACILITIES COSTS $107,200,000 Existing deficiencies + needs at buildout
TOTAL PARKS AND FACILITIES $405,175,000 Existing deficiencies + needs at buildout
Table 7-2: Park Deficiencies and Future Needs

8.2.a
Packet Pg. 305 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 150 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
Land Use
Designation
Persons per
Dwelling
Unit
Number of Units
Generating 1,000
population
Fee per Unit
($5,300,000/units generating 1,000 population)
Land Cost per
Unit
($625,000 for 5 acres of
parkland/units generating 1,000 population)
Mixed Use Hillside 3 333 $15,916 $1,879
Estate Residential 3 333 $15,916 $1,879
Low Density
Residential
3 333 $15,916 $1,879
Medium Density $13,250
Residential 2.5 400 $13,250 $1,563
High Density
Residential

2.5 400 $13,250 $1,563
Downtown
Residential

2.75 364 $14,561 $1,717
Downtown Core 2.5 400 $13,250 $1,563
Table 7-3: Development Fees Per Unit Type

8.2.a
Packet Pg. 306 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 151
7 IMPLEMENTATION

PARKS AND RECREATION MASTER PLAN
Description Quantity Construction
Cost
"Design and
Contingency
(+20%
Cont.)"
"Admin. Costs
(+30% soft cost)"
Neighborhood Park 43,560 SF $1,525,000 $1,830,000 $1,982,500 Basic Park Improvements - Large
Parks
43,560 SF $1,525,000 $1,830,000 $1,982,500
Natural Park/Trail 43,560 SF $1,525,000 $1,830,000 $1,982,500 Basketball Court - Basic, Lit 8,000 SF $450,000 $540,000 $585,000 Dog Park (1.5 acre) 65,340 SF $1,500,000 $1,800,000 $1,950,000 Dog Park (Half acre) 21,780 SF $650,000 $780,000 $845,000 Play Area - Basic 5,000 SF $650,000 $780,000 $845,000
Play Area - All Abilities 5,000 SF $2,250,000 $2,670,000 $2,925,000 Play Area - All Abilities (elaborate) 5,000 SF $3,500,000 $4,200,000 $4,550,000 Prefabricated Restrooms - Small 500 SF $500,000 $600,000 $650,000 Restroom/Concession 2,000 SF $1,500,000 $1,800,000 $1,950,000 Multi-Use Turf - Small 1.5 Acre 65,340 SF $3,270,000 $3,924,000 $4,251,000 Multi-Use Turf - Large 3 Acre 130,680 SF $6,535,000 $7,842,000 $8,495,500 Picnic Area - Small 3,000 SF $150,000 $180,000 $195,000 Group Picnic - Medium 6,000 SF $300,000 $360,000 $390,000 Neighborhood Gathering Place 6,000 SF $400,000 $480,000 $520,000 Sports Field Lighting 6 EA $1,000,000 $1,200,000 $1,300,000 Updgrades to LED Lighting 1 EA $2,000 $2,400 $2,600
Basketball Court Lighting 4 EA $30,000 $36,000 $39,000
Demonstration Garden 2,000 SF $75,000 $90,000 $97,500
Community Garden 5,000 SF $250,000 $300,000 $325,000
Pump Track - Dirt 9,000 SF $400,000 $480,000 $520,000
Pump Track - Asphalt 9,000 SF $525,000 $630,000 $682,500 Splash Pad 2,500 SF $3,000,000 $3,600,000 $3,900,000
NOTE: Does not include land acquisition
Table 7-4: Planning Level Park Costs

8.2.a
Packet Pg. 307 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 152 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
7 IMPLEMENTATION
This page intentionally left blank

8.2.a
Packet Pg. 308 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

APPENDICES
A. COMMUNITY OUTREACH (2021)
B. BENCHMARKING STUDY DATA COLLECTION
C. REPORT: ACCESS TO RECREATIONAL OPEN SPACE IN

PATTERSON
D. PRIVATE SECTOR PARTNERSHIP STRATEGIES

8.2.a
Packet Pg. 309 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for

8.2.a
Packet Pg. 310 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 155
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
APPENDIX A - COMMUNITY OUTREACH (2021)
Pop-Ups at City Events (8/14 - 10/21/2021)
The Parks & Recreation Master Plan team facilitated pop-ups at 3 City-sponsored events and at the Hammon Senior Center throughout Fall 2021, to gain community feedback regarding the park & recreation system and encourage people to take the online survey. Participants utilized dot boards to vote on their preferences for future improvements and additions. An estimated total of 522 community members participated across the 4 in-person input opportunities. The events/pop-ups included:
• Back to School Block Party & Child Safety Fair (August 14, 2021) • Sherriff’s Department BBQ (September 25, 2021)
• Halloween Floating Pumpkin Patch (October 9, 2021)
• Hammon Senior Center (October 14-21, 2021)
Cumulative data from these events is detailed on the following pages and categorized by the prompt listed on each board.

Participants at the Back to School Block Party & Child Safety Fair (Aug. 14, 2021)

8.2.a
Packet Pg. 311 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 156 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
8 APPENDICES
Pop-Up Prompt: What do you LIKE about your parks?
Amenity
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21) ALL
Baseball/Softball Fields 21 6 0 0 27
Basketball Half Courts 26 11 5 1 43
BBQs 22 6 4 4 36
Lawn Space for Casual Use/Relaxation 19 5 4 0 28
Lawn Space for Informal/Practice Sports 13 10 5 0 28
Picnic Tables 24 6 3 3 36
Playgrounds 66 18 8 2 94
Reservable Group Picnic Area 36 9 3 3 51
Soccer Fields 34 19 2 3 58
Walking Paths 42 10 6 7 65
303 100 40 23 466
0 10 20 30
Baseball/Softball Fields
Basketball Half Courts
BBQs
Lawn Space for Casual Use/Relaxation
Lawn Space for Informal/Practice Sports
Picnic Tables
Playgrounds
Reservable Group Picnic Area
Soccer Fields
Walking Paths
What do you LIKE abo
0 10 20 30 40 50 60
Baseball/Softball Fields
Basketball Half Courts
BBQs
Lawn Space for Casual Use/Relaxation
Lawn Space for Informal/Practice Sports
Picnic Tables
Playgrounds
Reservable Group Picnic Area
Soccer Fields
Walking Paths
What do you LIKE about your parks?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)
n
)
Seniors
(10/14-21/21) ALL
0 0 27
5 1 43
4 4 36
4 0 28
5 0 28
3 3 36
8 2 94
3 3 51
2 3 58
6 7 65
23 466
0 10 20 30 40 50 60 70 80 90 100
Baseball/Softball Fields
Basketball Half Courts
BBQs
Lawn Space for Casual Use/Relaxation
Lawn Space for Informal/Practice Sports
Picnic Tables
Playgrounds
Reservable Group Picnic Area
Soccer Fields
Walking Paths
What do you LIKE about your parks?
20 30 40 50 60 70
do you LIKE about your parks?
ol
21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)
Amenity
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21) ALL
Baseball/Softball Fields 21 6 0 0 27
Basketball Half Courts 26 11 5 1 43
BBQs 22 6 4 4 36
Lawn Space for Casual Use/Relaxation 19 5 4 0 28
Lawn Space for Informal/Practice Sports 13 10 5 0 28
Picnic Tables 24 6 3 3 36
Playgrounds 66 18 8 2 94
Reservable Group Picnic Area 36 9 3 3 51
Soccer Fields 34 19 2 3 58
Walking Paths 42 10 6 7 65
303 100 40 23 466
0 10 20 30 40 50 60 70 80
Baseball/Softball Fields
Basketball Half Courts
BBQs
Lawn Space for Casual Use/Relaxation
Lawn Space for Informal/Practice Sports
Picnic Tables
Playgrounds
Reservable Group Picnic Area
Soccer Fields
Walking Paths
What do you LIKE about your parks?
0 10 20 30 40 50 60 70
Baseball/Softball Fields
Basketball Half Courts
BBQs
Lawn Space for Casual Use/Relaxation
Lawn Space for Informal/Practice Sports
Picnic Tables
Playgrounds
Reservable Group Picnic Area
Soccer Fields
Walking Paths
What do you LIKE about your parks?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)

8.2.a
Packet Pg. 312 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 157
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
Pop-Up Prompt: What would you like to see ADDED to Patterson Parks? Amenity
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21) ALL
Access to Wifi 62 31 4 10 107
Baseball/Softball Field 21 5 9 2 37
Basketball Full Court 18 3 1 2 24
Bocce Ball Court 6 7 8 8 29
Community Garden 23 1 1 10 35
Dog Park 56 1 6 5 68
Exercise Stations 28 15 2 8 53
Lacrosse Field 1 1 0 0 2
More Picnic Areas 11 1 0 1 13
More Playgrounds 48 1 8 2 59
More Restrooms 37 1 6 6 50
Multi-Use Paths (walking, jogging, biking) 26 4 12 4 46 Native & Drought Tolerant Planting 8 1 1 4 14
Outdoor Ampitheater 13 10 1 5 29
Pickleball Court 10 5 1 3 19
Public Art 46 14 2 2 64
Pump Track (Bike Park) 42 15 4 0 61
Quiet Area to Connect with Nature 44 4 2 5 55
Reservable Group Picnic Area 9 1 1 2 13
Skate/Scooter/BMX Park 18 9 4 1 32
Soccer Field 28 26 5 2 61
Spray (Water) Pad 84 18 6 1 109
Teen Gathering Space 53 22 9 2 86
Tennis Court 16 4 2 3 25
Volleyball Court 25 7 2 0 34
Quad Track 1 1
Shade 6 6
Football Field 1 1
Paintball Area 1 1
Hospital 20 20
DMV 16 16
740 209 97 124 1,170
0 20 40 60 80 100 120
Access to Wifi
Baseball/Softball Field
Basketball Full Court
Bocce Ball Court
Community Garden
Dog Park
Exercise Stations
Lacrosse Field
More Picnic Areas
More Playgrounds
More Restrooms
Multi-Use Paths (walking, jogging, biking)
Native & Drought Tolerant Planting
Outdoor Ampitheater
Pickleball Court
Public Art
Pump Track (Bike Park)
Quiet Area to Connect with Nature
Reservable Group Picnic Area
Skate/Scooter/BMX Park
Soccer Field
Spray (Water) Pad
Teen Gathering Space
Tennis Court
Volleyball Court
Quad Track
Shade
Football Field
Paintball Area
Hospital
DMV
What would you like to see ADDED to Patterson parks?
0 10 20 30
Access to Wifi
Baseball/Softball Field
Basketball Full Court
Bocce Ball Court
Community Garden
Dog Park
Exercise Stations
Lacrosse Field
More Picnic Areas
More Playgrounds
More Restrooms
Multi-Use Paths (walking, jogging, biking)
Native & Drought Tolerant Planting
Outdoor Ampitheater
Pickleball Court
Public Art
Pump Track (Bike Park)
Quiet Area to Connect with Nature
Reservable Group Picnic Area
Skate/Scooter/BMX Park
Soccer Field
Spray (Water) Pad
Teen Gathering Space
Tennis Court
Volleyball Court
Quad Track
Shade
Football Field
Paintball Area
Hospital
DMV
What would you like to see ADD
School
(8/14/21)
BBQ
(9/25/21)
Hallow
(10/9/

8.2.a
Packet Pg. 313 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 158 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
8 APPENDICES
Pop-Up Prompt: What would you like to see ADDED to Patterson Parks? (cont.) ALL
107
37 24
29 35
68 53
2 13
59 50
46 14
29 19
64 61
55 13
32 61
109
86 25
34 1
6 1
1 20
16 170
100 120
ks?
0 10 20 30 40 50 60 70 80 90
Access to Wifi
Baseball/Softball Field
Basketball Full Court
Bocce Ball Court
Community Garden
Dog Park
Exercise Stations
Lacrosse Field
More Picnic Areas
More Playgrounds
More Restrooms
Multi-Use Paths (walking, jogging, biking)
Native & Drought Tolerant Planting
Outdoor Ampitheater
Pickleball Court
Public Art
Pump Track (Bike Park)
Quiet Area to Connect with Nature
Reservable Group Picnic Area
Skate/Scooter/BMX Park
Soccer Field
Spray (Water) Pad
Teen Gathering Space
Tennis Court
Volleyball Court
Quad Track
Shade
Football Field
Paintball Area
Hospital
DMV
What would you like to see ADDED to Patterson parks?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)

8.2.a
Packet Pg. 314 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 159
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
Pop-Up Prompt: What amenities would you like to see in the future RECREATION CENTER? Amenity
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21) ALL
Auditorium 11 6 0 2 19
Classrooms 9 10 0 3 22
Climbing Walls 68 32 7 4 111
Community/Activity Rooms 26 20 4 7 57
Dance Studio 20 24 3 4 51
Game Room 58 13 3 3 77
Gymnasium 20 18 4 2 44
Multi-Use Hardwood Courts 16 17 2 0 35
Prep Kitchen 31 14 3 6 54
Preschool 11 12 2 4 29
Rentable Meeting Rooms 9 9 0 2 20
Teen Center 28 17 5 4 54
Theater Space 29 18 4 6 57
Workout Space with Fitness Equipment 44 23 1 7 75
Bowling 1 1
Slime Room 1 1
Extend Senior Center 21 21
Local Police Dept 5 5
380 235 38 80 733
0 Auditorium
Classrooms
Climbing Walls
Community/Activity Rooms
Dance Studio
Game Room
Gymnasium
Multi-Use Hardwood Courts
Prep Kitchen
Preschool
Rentable Meeting Rooms
Teen Center
Theater Space
Workout Space with Fitness Equipment
Bowling
Slime Room
Extend Senior Center
Local Police Dept
What amenities
RE
0 10 20 30 40 50 60 70 80
Auditorium
Classrooms
Climbing Walls
Community/Activity Rooms
Dance Studio
Game Room
Gymnasium
Multi-Use Hardwood Courts
Prep Kitchen
Preschool
Rentable Meeting Rooms
Teen Center
Theater Space
Workout Space with Fitness Equipment
Bowling
Slime Room
Extend Senior Center
Local Police Dept
What amenities would you like to see in the future
RECREATION CENTER?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)
ors
/21) ALL
2 19
3 22
4 111
7 57
4 51
3 77
2 44
0 35
6 54
4 29
2 20
4 54
6 57
7 75
1 1
21 21
5 5
80 733
0 20 40 60 80 100 120
Auditorium
Classrooms
Climbing Walls
Community/Activity Rooms
Dance Studio
Game Room
Gymnasium
Multi-Use Hardwood Courts
Prep Kitchen
Preschool
Rentable Meeting Rooms
Teen Center
Theater Space
Workout Space with Fitness Equipment
Bowling
Slime Room
Extend Senior Center
Local Police Dept
What amenities would you like to see in the future
RECREATION CENTER?
70 80

8.2.a
Packet Pg. 315 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 160 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
8 APPENDICES
Pop-Up Prompt: What amenities would you like to see in the future RECREATION CENTER? (cont.)
Preschool 11 12 2 4 29
Rentable Meeting Rooms 9 9 0 2 20
Teen Center 28 17 5 4 54
Theater Space 29 18 4 6 57
Workout Space with Fitness Equipment 44 23 1 7 75
Bowling 1 1
Slime Room 1 1
Extend Senior Center 21 21
Local Police Dept 5 5
380 235 38 80 733
Multi-U
Ren
Workout Space w
0 10 20 30 40 50 60 70 80
Auditorium
Classrooms
Climbing Walls
Community/Activity Rooms
Dance Studio
Game Room
Gymnasium
Multi-Use Hardwood Courts
Prep Kitchen
Preschool
Rentable Meeting Rooms
Teen Center
Theater Space
Workout Space with Fitness Equipment
Bowling
Slime Room
Extend Senior Center
Local Police Dept
What amenities would you like to see in the future
RECREATION CENTER?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)

8.2.a
Packet Pg. 316 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 161
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
Pop-Up Prompt: What features would you like to see in the future AQUATICS CENTER? Amenity
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21) ALL
Group Special Play Features 38 19 5 1 63
Multi-Use Exercise Pool 31 32 6 0 69
Open Swim Pool 48 26 4 3 81
Party Cabana/Rentable Pool Space 14 17 6 1 38
Shaded Picnic Area 20 26 7 4 57
Splash Pad 45 23 7 1 76
Water Play Structure 80 21 10 2 113
Water Slides 144 30 17 5 196
Whirlpool/Spa 36 20 8 1 65
Tot Pool 7 7
Bingo Games 1 1
463 215 70 18 766
Group Special Play Features
Multi-Use Exercise Pool
Open Swim Pool
Party Cabana/Rentable Pool Space
Shaded Picnic Area
Splash Pad
Water Play Structure
Water Slides
Whirlpool/Spa
Tot Pool
Bingo Games
What feature
0 20 40 60 80 100 120 140 160
Group Special Play Features
Multi-Use Exercise Pool
Open Swim Pool
Party Cabana/Rentable Pool Space
Shaded Picnic Area
Splash Pad
Water Play Structure
Water Slides
Whirlpool/Spa
Tot Pool
Bingo Games
What features would you like to see in the future
AQUATICS CENTER?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)
Seniors
4-21/21) ALL
1 63
0 69
3 81
1 38
4 57
1 76
2 113
5 196
1 65
7 1
18 766
0 50 100 150 200 250
Group Special Play Features
Multi-Use Exercise Pool
Open Swim Pool
Party Cabana/Rentable Pool Space
Shaded Picnic Area
Splash Pad
Water Play Structure
Water Slides
Whirlpool/Spa
Tot Pool
Bingo Games
What features would you like to see in the future AQUATICS CENTER?
140 160

8.2.a
Packet Pg. 317 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 162 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
8 APPENDICES
Pop-Up Prompt: What features would you like to see in the future AQUATICS CENTER? (cont.) Shaded Picnic Area 20 26 7 4 57
Splash Pad 45 23 7 1 76
Water Play Structure 80 21 10 2 113
Water Slides 144 30 17 5 196
Whirlpool/Spa 36 20 8 1 65
Tot Pool 7 7
Bingo Games 1 1
463 215 70 18 766
Grou
Party Caba
0 20 40 60 80 100 120 140 160
Group Special Play Features
Multi-Use Exercise Pool
Open Swim Pool
Party Cabana/Rentable Pool Space
Shaded Picnic Area
Splash Pad
Water Play Structure
Water Slides
Whirlpool/Spa
Tot Pool
Bingo Games
What features would you like to see in the future
AQUATICS CENTER?
School
(8/14/21)
BBQ
(9/25/21)
Halloween
(10/9/21)
Seniors
(10/14-21/21)

8.2.a
Packet Pg. 318 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 163
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
Online Survey (August - October 2021)
An online survey was open for community input from August to October 2021. To increase accessibility, the survey was offered in both Spanish and English, and printed copies were available at pop-up events and the Hammon Senior Center. The results are detailed on the following pages.

Patterson Parks and Recreation Master Plan Community Survey Encuesta de la comunidad para la actualización del Plan Maestro de Parques y Recreación de Patterson 1 / 34

35.09% 60

30.99% 53

9.94% 17

14.62% 25

3.51% 6

5.85% 10
Q1 How often do you visit a Patterson Park?¿Con qué frecuencia visita un parque de Patterson?
Answered: 171 Skipped: 3
TOTAL 171
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Multiple times
a weekVarias...

WeeklySemanal
MonthlyMensual
Occasionally
(once every ...

Rarely (once
every 6...

Almost Never
(once a...

ANSWER CHOICES RESPONSES
Multiple times a weekVarias veces a la semana
WeeklySemanal
MonthlyMensual
Occasionally (once every 3 months)Ocasionalmente (una vez cada 3 meses) Rarely (once every 6 months)Rara vez (una vez cada 6 meses) Almost Never (once a year)Casi nunca (una vez al año o menos)

8.2.a
Packet Pg. 319 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 164 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
8 APPENDICES
Online Survey (August - October 2021)
Patterson Parks and Recreation Master Plan Community Survey Encuesta de la comunidad para la actualización del Plan Maestro de Parques y Recreación de Patterson 2 / 34

41.52% 71

9.94% 17

30.99% 53

8.19% 14

69.59% 119

20.47% 35

33.33% 57

38.01% 65

60.82% 104

30.99% 53

1.17% 2

5.26% 9
Q2 Why do you visit a Patterson Park? Select all that apply.¿Por qué visita un parque en Patterson? Seleccione todas las que correspondan.

Answered: 171 Skipped: 3
Total Respondents: 171
# OTHER (PLEASE SPECIFY)OTROS (FAVOR DE ESPECIFICAR): DATE 1 To skateboard 11/21/2021 5:40 PM
2 Fresh air & shade 9/16/2021 6:44 AM
3 kids school 9/7/2021 11:22 PM
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Sports team
participatio...

Recreation
class or...

Individual
exerciseEjer...

Group
exerciseEjer...

To get
outdoorsPara...

Community
eventEvento...

Peace and
quietPaz y...

Gather with
family or...

Outing with
childrenSali...

Outing with
petSalida co...

Caregiving for
an...

Other (please
specify)Otro...

ANSWER CHOICES RESPONSES
Sports team participation (soccer, baseball, football, etc.)Participación en equipos deportivos (fútbol, béisbol, fútbol, etc.)
Recreation class or programPrograma o clase de recreación Individual exerciseEjercicio individual
Group exerciseEjercicio de grupo
To get outdoorsPara salir al aire libre
Community eventEvento comunitario
Peace and quietPaz y tranquilidad
Gather with family or friendsReunión con familiares o amigos Outing with childrenSalida con niños
Outing with petSalida con mascota
Caregiving for an adultCuidador de un adulto
Other (please specify)Otros (favor de especificar):

8.2.a
Packet Pg. 320 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 165
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
Online Survey (August - October 2021)
Patterson Parks and Recreation Master Plan Community Survey Encuesta de la comunidad para la actualización del Plan Maestro de Parques y Recreación de Patterson 3 / 34
4 To swing on the swings 9/7/2021 5:36 PM
5 I don't go to one. 9/7/2021 5:23 PM
6 I don’t go to park 8/31/2021 12:58 AM
7 Play with RC cars, trucks and planes. 8/24/2021 5:20 PM 8 Kids get together 8/23/2021 9:05 AM
9 There is really nothing available with these tiny parks everywhere instead of parks like turlock and Clovis cities have that allow for more.
8/20/2021 3:13 PM

8.2.a
Packet Pg. 321 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for 166 CITY OF PATTERSON

PARKS AND RECREATION MASTER PLAN
8 APPENDICES
Online Survey (August - October 2021)
Patterson Parks and Recreation Master Plan Community Survey Encuesta de la comunidad para la actualización del Plan Maestro de Parques y Recreación de Patterson 4 / 34
Q3 What limits your use of Patterson Parks? Select all that apply.¿Qué limita su uso de parques en Patterson? Seleccione todas las que correspondan.

Answered: 165 Skipped: 9
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Travel
distance is ...

Hard to get to
without a...

Limited
availability...

Poor lighting
conditionsMa...

Lack of
adequate...

Poor condition
of planting ...

Poor condition
of equipment...

Poor
facilities...

There isn't
anything I w...

Lack of
amenities th...

Lack of
restroomsFal...

Not aware of
the availabl...

I use other
parks/facili...

I don't have
timeNo tengo...

Other (please
specify):o....

8.2.a
Packet Pg. 322 Attachment: Patterson_Parks_Master_Plan_FinalDraft2022_-_Compressed_File (Approve the CEQA Addendum to the 2010 General Plan EIR for CITY OF PATTERSON 167
8 APPENDICES

PARKS AND RECREATION MASTER PLAN
Online Survey (August - October 2021)
Patterson Parks and Recreation Master Plan Community Survey Encuesta de la comunidad para la actualización del Plan Maestro de Parques y Recreación de Patterson 5 / 34

8.48% 14

7.27% 12

44.24% 73

17.58% 29

9.70% 16

9.09% 15

20.61% 34

29.09% 48

19.39% 32

33.94% 56

41.21% 68

5.45% 9

4.85% 8

13.33% 22

14.55% 24
Total Respondents: 165
# OTHER (PLEASE SPECIFY):O. OTROS (FAVOR DE ESPECIFICAR): DATE 1 Need a better skatepark where there’s more room to skate like the Oakdale skatepark 11/21/2021 5:40 PM 2 No limiting factors 10/24/2021 1:37 PM
3 Par course 9/16/2021 6:44 AM
4 Homeless people living in certain parks. It's scary 9/14/2021 10:04 PM 5 Recreation time spent cycling (bicycle) 9/8/2021 2:24 PM 6 need basketball count 9/7/2021 11:22 PM
7 I just don't always go 9/7/2021 5:36 PM
8 Homeless usage and trash 9/7/2021 1:54 PM
9 surrounding neighborhoods is unsafe. 9/7/2021 12:57 PM 10 For safety reasons, I don't want to bring my family around the people who camp out at the park.
8/31/2021 10:19 PM
11 To small 8/31/2021 12:58 AM
12 There’s amenities but no programs. Softball fields - no kids softball sign ups. I played professional softball. Looking to coach girls softball. 8/30/2021 8:55 PM
13 Lot of homeless at the park close to the city building. The park is great but I don’t feel safe to bring my child there since those person always are there smoking and sleeping 8/30/2021 7:59 PM
14 lack of baseball practice facilities that don't require payment 8/30/2021 7:16 PM 15 Homeless sleeping 8/30/2021 4:39 PM
16 Too many bugs. 8/30/2021 4:33 PM
17 See above… Have used other parks in other cities at times because they have larger trees with more shade. Seems like Patterson does the very least to their parks. 8/24/2021 7:48 PM
18 Homeless 8/20/2021 5:03 PM
19 Not new or exciting equipment. New to the area and dont know where all the parks are. Would be helpful to have a map on the parks website or a city app that shows where they are. 8/19/2021 10:49 PM
20 The level of the grass areas are not safe for young children. 8/19/2021 2:16 PM 21 Too many unsupervised kids some being disrespectful or doing things in front of children 8/19/2021 12:31 PM 22 None 8/19/2021 11:57 AM
23 Too many methheads. I do not feel safe! 8/19/2021 11:09 AM 24 Worried about cleanliness of the playground 8/19/2021 10:27 AM

← All documents from this meeting