Cities Index.
Agenda packet

Pico Rivera City Council
January 24, 2023

Document
Agenda packet
Meeting
January 24, 2023
Body
Pico Rivera City Council
Pages
126
Original file
261.8 MB
Text extracted from the city's file for reading and search. Open the original on picoriveraspeaks.org. That file is the official record.

Sensitive Receptors
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved. Sensitive population groups include children, the elderly, the acutely ill, and the chronically ill, especially those with cardio-respiratory diseases.

Residential areas are also considered to be sensitive receptors to air pollution because residents (including children and the elderly) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Schools are also considered sensitive receptors, as children are present for extended durations and engage in regular outdoor activities. Recreational land uses are considered moderately sensitive to air pollution. Although exposure periods are generally short, exercise places a high demand on respiratory functions, which can be impaired by air pollution. In addition, noticeable air pollution can detract from the enjoyment of recreation. Industrial and commercial areas are considered the least sensitive to air pollution.

Exposure periods are relatively short and intermittent, as the majority of the workers tend to stay indoors most of the time. In addition, the working population is generally the healthiest segment of the public. The nearest sensitive receptors to the proposed project site are the residences along Goodbee Street and Birchleaf Avenue to the northwest.

Methodology
Projected construction-related air pollutant emissions are calculated using the California Emissions Estimator Model (CalEEMod), Version 2020.4. CalEEMod compiles an emissions inventory of construction (fugitive dust, off-gas emissions, on-road emissions, and off-road emissions), area sources, indirect emissions from energy use, mobile sources, indirect emissions from waste disposal (annual only), and indirect emissions from water/wastewater (annual only) use. The calculated emissions of the project are compared to thresholds of significance for individual projects using the South Coast AQMD’s CEQA Air Quality Analysis Guidance Handbook.

Thresholds of Significance
The analysis of the proposed project’s air quality impacts follows the guidance and methodologies recommended in South Coast AQMD’s CEQA Air Quality Handbook and the significance thresholds on South Coast AQMD’s website (South Coast AQMD 1993). CEQA allows the significance criteria established by the applicable air quality management or air pollution control district to be used to assess impacts of a project on air quality. South Coast AQMD has established thresholds of significance for regional air quality emissions for construction activities and project operation. In addition to the daily thresholds listed above, projects are also subject to the AAQS. These are addressed though an analysis of localized CO impacts and localized significance thresholds (LSTs).

REGIONAL SIGNIFICANCE THRESHOLDS
The South Coast AQMD has adopted regional construction and operational emissions thresholds to determine a project’s cumulative impact on air quality in the SoCAB. Table 4 lists South Coast AQMD’s regional significance thresholds that are applicable for all projects uniformly regardless of size or scope. There is

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 14 ends

growing evidence that although ultrafine particulates contribute a very small portion of the overall atmospheric mass concentration, they represent a greater proportion of the health risk from PM. However, the EPA or CARB have not yet adopted AAQS to regulate ultrafine particulates; therefore, South Coast AQMD has not developed thresholds for them.

Table 4 South Coast AQMD Significance Thresholds
Air Pollutant Construction Phase Operational Phase
Reactive Organic Gases (ROGs)/ Volatile
Organic Compounds (VOCs) 75 lbs/day 55 lbs/day
Nitrogen Oxides (NOX) 100 lbs/day 55 lbs/day
Carbon Monoxide (CO) 550 lbs/day 550 lbs/day
Sulfur Oxides (SOX) 150 lbs/day 150 lbs/day
Particulates (PM10) 150 lbs/day 150 lbs/day
Particulates (PM2.5) 55 lbs/day 55 lbs/day
Source: South Coast AQMD 2019.

Projects that exceed the regional significance threshold contribute to the nonattainment designation of the SoCAB. The attainment designations are based on the AAQS, which are set at levels of exposure that are determined to not result in adverse health. Exposure to fine particulate pollution and ozone causes myriad health impacts, particularly to the respiratory and cardiovascular systems:
 Linked to increased cancer risk (PM2.5, TACs)
 Aggravates respiratory disease (O3, PM2.5)
 Increases bronchitis (O3, PM2.5)
 Causes chest discomfort, throat irritation, and increased effort to take a deep breath (O3)  Reduces resistance to infections and increases fatigue (O3)  Reduces lung growth in children (PM2.5)
 Contributes to heart disease and heart attacks (PM2.5)  Contributes to premature death (O3, PM2.5)
 Linked to lower birth weight in newborns (PM2.5) (South Coast AQMD 2015b) Exposure to fine particulates and ozone aggravates asthma attacks and can amplify other lung ailments such as emphysema and chronic obstructive pulmonary disease. Exposure to current levels of PM2.5 is responsible for an estimated 4,300 cardiopulmonary-related deaths per year in the SoCAB. In addition, University of Southern California scientists responsible for a landmark children’s health study found that lung growth improved as air pollution declined for children aged 11 to 15 in five communities in the SoCAB (South Coast AQMD 2015c).

Mass emissions in Table 4 are not correlated with concentrations of air pollutants but contribute to the cumulative air quality impacts in the SoCAB. Therefore, regional emissions from a single project do not singlehandedly trigger a regional health impact. South Coast AQMD is the primary agency responsible for ensuring the health and welfare of sensitive individuals to elevated concentrations of air quality in the SoCAB. To achieve

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 15 ends

the health-based standards established by the EPA, South Coast AQMD prepares an AQMP that details regional programs to attain the AAQS.

CO HOTSPOTS
Areas of vehicle congestion have the potential to create pockets of CO called hot spots. These pockets have the potential to exceed the state one-hour standard of 20 ppm or the eight-hour standard of 9 ppm. Because CO is produced in greatest quantities from vehicle combustion and does not readily disperse into the atmosphere, adherence to ambient air quality standards is typically demonstrated through an analysis of localized CO concentrations. Hot spots are typically produced at intersections, where traffic congestion is highest because vehicles queue for longer periods and are subject to reduced speeds. With the turnover of older vehicles, introduction of cleaner fuels, and implementation of control technology on industrial facilities, CO concentrations in the SoCAB and in the state have steadily declined.

In 2007, the SoCAB was designated in attainment for CO under both the California AAQS and National AAQS.

The CO hot spot analysis conducted for the attainment by the South Coast AQMD for busiest intersections in Los Angeles during the peak morning and afternoon periods plan did not predict a violation of CO standards.7 As identified in the South Coast AQMD's 2003 AQMP and the 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan), peak carbon monoxide concentrations in the SoCAB in previous years, prior to redesignation, were a result of unusual meteorological and topographical conditions and not a result of congestion at a particular intersection. Under existing and future vehicle emission rates, a project would have to increase traffic volumes at a single intersection by more than 44,000 vehicles per hour—or 24,000 vehicles per hour where vertical and/or horizontal air does not mix—in order to generate a significant CO impact (BAAQMD 2017).

LOCALIZED SIGNIFICANCE THRESHOLDS
The South Coast AQMD developed LSTs for emissions of NO2, CO, PM10, and PM2.5 generated at the project site (offsite mobile-source emissions are not included in the LST analysis). LSTs represent the maximum emissions at a project site that are not expected to cause or contribute to an exceedance of the most stringent federal or state AAQS and are shown in Table 5.
7 The four intersections were: Long Beach Boulevard and Imperial Highway; Wilshire Boulevard and Veteran Avenue; Sunset Boulevard and Highland Avenue; and La Cienega Boulevard and Century Boulevard. The busiest intersection evaluated (Wilshire and Veteran) had a daily traffic volume of approximately 100,000 vehicles per day with LOS E in the morning peak hour and LOS F in the evening peak hour.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 16 ends

Table 5 South Coast AQMD Localized Significance Thresholds Air Pollutant (Relevant AAQS) Concentration
1-Hour CO Standard (CAAQS) 20 ppm
8-Hour CO Standard (CAAQS) 9.0 ppm
1-Hour NO2 Standard (CAAQS) 0.18 ppm
Annual NO2 Standard (CAAQS) 0.03 ppm
24-Hour PM10 Standard – Construction (South Coast AQMD) 1 10.4 µg/m3
24-Hour PM2.5 Standard – Construction (South Coast AQMD) 1 10.4 µg/m3
24-Hour PM10 Standard – Operation (South Coast AQMD)
1 2.5 µg/m3
24-Hour PM2.5 Standard – Operation (South Coast AQMD)
1 2.5 µg/m3
Source: South Coast AQMD 2019.
ppm – parts per million; µg/m3 – micrograms per cubic meter 1 Threshold is based on South Coast AQMD Rule 403. Since the SoCAB is in nonattainment for PM10 and PM2.5, the threshold is established as an allowable change in concentration. Therefore, background concentration is irrelevant.

To assist lead agencies, South Coast AQMD developed screening-level LSTs to back-calculate the mass amount (lbs. per day) of emissions generated onsite that would trigger the levels shown in Table 5 for projects under 5- acres. These “screening-level” LSTs tables are the localized significance thresholds for all projects of five acres and less; however, it can be used as screening criteria for larger projects to determine whether or not dispersion modeling may be required to compare concentrations of air pollutants generated by the project to the localized concentrations shown in Table 5.

In accordance with South Coast AQMD’s LST methodology, the screening-level construction LSTs are based on the acreage disturbed per day based on equipment use. The screening-level construction LSTs for the project site in SRA 5 are shown in Table 6, South Coast AQMD Screening-Level Construction Localized Significance Thresholds, for sensitive receptors within 82 feet (25 meters).

Table 6 South Coast AQMD Screening-Level Construction Localized Significance Thresholds Acreage Disturbed
Threshold (lbs/day)1
Nitrogen Oxides
(NOX)
Carbon Monoxide
(CO)
Coarse Particulates
(PM10)
Fine Particulates
(PM2.5)
≤1.00 Acre Disturbed Per Day 80 571 4.00 3.00

1.38 Acres Disturbed Per Day 93 680 5.12 3.37

1.94 Acres Disturbed Per Day 112 843 6.81 3.94

2.00 Acres Disturbed Per Day 114 861 7.00 4.00

2.85 Acres Disturbed Per Day 130 1,036 8.98 4.85
Source: South Coast AQMD 2008a and 2011.
1 LSTs are based on receptors within 82 feet (25 meters) in SRA 5.

Because the project is not an industrial project that has the potential to emit substantial sources of stationary emissions, operational LSTs are not an air quality impact of concern associated with the project.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 17 ends

Health Risk
Whenever a project would require use of chemical compounds that have been identified in South Coast AQMD Rule 1401, placed on CARB’s air toxics list pursuant to AB 1807, or placed on the EPA’s National Emissions Standards for Hazardous Air Pollutants, a health risk assessment is required by the South Coast AQMD. Table 7, Toxic Air Contaminants Incremental Risk Thresholds, lists the TAC incremental risk thresholds for operation of a project. The purpose of this environmental evaluation is to identify the significant effects of the proposed project on the environment, not the significant effects of the environment on the proposed project. (California Building Industry Association v. Bay Area Air Quality Management District (2015) 62 Cal.4th 369 (Case No. S213478)).

CEQA does not require CEQA-level environmental document to analyze the environmental effects of attracting development and people to an area. However, the environmental document must analyze the impacts of environmental hazards on future users, when a proposed project exacerbates an existing environmental hazard or condition. Residential, commercial, and office uses do not use substantial quantities of TACs and typically do not exacerbate existing hazards, so these thresholds are typically applied to new industrial projects.

Table 7 South Coast AQMD Toxic Air Contaminants Incremental Risk Thresholds
Maximum Incremental Cancer Risk ≥ 10 in 1 million
Hazard Index (project increment) ≥ 1.0
Cancer Burden in areas ≥ 1 in 1 million > 0.5 excess cancer cases Source: South Coast AQMD 2019.

GREENHOUSE GAS EMISSIONS
Scientists have concluded that human activities are contributing to global climate change by adding large amounts of heat-trapping gases, known as GHG, to the atmosphere. Climate change is the variation of Earth’s climate over time, whether due to natural variability or as a result of human activities. The primary source of these GHG is fossil fuel use. The Intergovernmental Panel on Climate Change (IPCC) has identified four major GHG—water vapor,8 carbon (CO2), methane (CH4), and ozone (O3)—that are the likely cause of an increase in global average temperatures observed within the 20th and 21st centuries. Other GHG identified by the IPCC that contribute to global warming to a lesser extent include nitrous oxide (N2O), sulfur hexafluoride (SF6), hydrofluorocarbons, perfluorocarbons, and chlorofluorocarbons (IPCC 2001).9 The major GHG are briefly described below.
8 Water vapor (H2O) is the strongest GHG and the most variable in its phases (vapor, cloud droplets, ice crystals). However, water vapor is not considered a pollutant, but part of the feedback loop rather than a primary cause of change. 9 Black carbon contributes to climate change both directly, by absorbing sunlight, and indirectly, by depositing on snow (making it melt faster) and by interacting with clouds and affecting cloud formation. Black carbon is the most strongly light-absorbing component of particulate matter (PM) emitted from burning fuels such as coal, diesel, and biomass. Reducing black carbon emissions globally can have immediate economic, climate, and public health benefits. California has been an international leader in reducing emissions of black carbon, with close to 95 percent control expected by 2020 due to existing programs that target reducing PM from diesel engines and burning activities (CARB 2017a). However, state and national GHG inventories do not yet include black carbon due to ongoing work resolving the precise global warming potential of black carbon. Guidance for CEQA documents does not yet include black carbon.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 18 ends

 Carbon dioxide (CO2) enters the atmosphere through the burning of fossil fuels (oil, natural gas, and coal), solid waste, trees and wood products, and respiration, and also as a result of other chemical reactions (e.g. manufacture of cement). Carbon dioxide is removed from the atmosphere (sequestered) when it is absorbed by plants as part of the biological carbon cycle.  Methane (CH4) is emitted during the production and transport of coal, natural gas, and oil. Methane emissions also result from livestock and other agricultural practices and from the decay of organic waste in municipal landfills and water treatment facilities.
 Nitrous oxide (N2O) is emitted during agricultural and industrial activities as well as during combustion of fossil fuels and solid waste.
 Fluorinated gases are synthetic, strong GHGs that are emitted from a variety of industrial processes.

Fluorinated gases are sometimes used as substitutes for ozone-depleting substances. These gases are typically emitted in smaller quantities, but because they are potent GHGs, they are sometimes referred to as high global-warming-potential (GWP) gases.
• Chlorofluorocarbons (CFCs) are GHGs covered under the 1987 Montreal Protocol and used for refrigeration, air conditioning, packaging, insulation, solvents, or aerosol propellants. Since they are not destroyed in the lower atmosphere (troposphere, stratosphere), CFCs drift into the upper atmosphere where, given suitable conditions, they break down ozone. These gases are also ozone-depleting gases and are therefore being replaced by other compounds that are GHGs covered under the Kyoto Protocol.
• Perfluorocarbons (PFCs) are a group of human-made chemicals composed of carbon and fluorine only. These chemicals (predominantly perfluoromethane [CF4] and perfluoroethane [C2F6]) were introduced as alternatives, along with HFCs, to the ozone-depleting substances. In addition, PFCs are emitted as by-products of industrial processes and are used in manufacturing. PFCs do not harm the stratospheric ozone layer, but they have a high global warming potential. • Sulfur Hexafluoride (SF6) is a colorless gas soluble in alcohol and ether, slightly soluble in water. SF6 is a strong GHG used primarily in electrical transmission and distribution systems as an insulator. • Hydrochlorofluorocarbons (HCFCs) contain hydrogen, fluorine, chlorine, and carbon atoms.

Although ozone-depleting substances, they are less potent at destroying stratospheric ozone than CFCs. They have been introduced as temporary replacements for CFCs and are also GHGs. • Hydrofluorocarbons (HFCs) contain only hydrogen, fluorine, and carbon atoms. They were introduced as alternatives to ozone-depleting substances to serve many industrial, commercial, and personal needs. HFCs are emitted as by-products of industrial processes and are also used in manufacturing. They do not significantly deplete the stratospheric ozone layer, but they are strong GHGs (IPCC 2001; USEPA 2020).

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 19 ends

GHGs are dependent on the lifetime or persistence of the gas molecule in the atmosphere. Some GHGs have stronger greenhouse effects than others. These are referred to as high GWP gases. The GWP of GHG emissions are shown in Table 8. The GWP is used to convert GHGs to CO2-equivalence (CO2e) to show the relative potential that different GHGs have to retain infrared radiation in the atmosphere and contribute to the greenhouse effect. For example, under IPCC’s Fourth Assessment Report (AR4) GWP values for CH4, a project that generates 10 metric tons (MT) of CH4 would be equivalent to 250 MT of CO2 (IPCC 2007).

Table 8 GHG Emissions and Their Relative Global Warming Potential Compared to CO2 GHGs
Second Assessment Report
Atmospheric Lifetime
(Years)
Fourth Assessment
Report Atmospheric
Lifetime (Years)
Second Assessment Report
Global Warming
Potential Relative to CO2
1 Fourth Assessment Report
Global Warming
Potential Relative to CO2
1 Carbon Dioxide (CO2) 50 to 200 50 to 200 1 1
Methane2 (CH4) 12 (±3) 12 21 25
Nitrous Oxide (N2O) 120 114 310 298
Hydrofluorocarbons:

HFC-23 264 270 11,700 14,800
HFC-32 5.6 4.9 650 675
HFC-125 32.6 29 2,800 3,500
HFC-134a 14.6 14 1,300 1,430
HFC-143a 48.3 52 3,800 4,470
HFC-152a 1.5 1.4 140 124
HFC-227ea 36.5 34.2 2,900 3,220
HFC-236fa 209 240 6,300 9,810
HFC-4310mee 17.1 15.9 1,300 1,030
Perfluoromethane: CF4 50,000 50,000 6,500 7,390
Perfluoroethane: C2F6 10,000 10,000 9,200 12,200
Perfluorobutane: C4F10 2,600 NA 7,000 8,860
Perfluoro-2-
methylpentane: C6F14
3,200 NA 7,400 9,300
Sulfur Hexafluoride (SF6) 3,200 NA 23,900 22,800
Source: IPCC 1995, 2007, 2013.

Notes:
1 The methane GWP includes direct effects and indirect effects due to the production of tropospheric ozone and stratospheric water vapor. The indirect effect due to the production of CO2 is not included. 2 Based on 100-year time horizon of the GWP of the air pollutant compared to CO2. 3 The GWP values in the IPCC’s Fifth Assessment Report (2013) reflect new information on atmospheric lifetimes of GHGs and an improved calculation of the radiative forcing of CO2. However, South Coast AQMD uses the AR4 GWP values to maintain consistency in statewide GHG emissions modeling. In addition, the 2017 Scoping Plan Update was based on the AR4 GWP values.

California’s Greenhouse Gas Sources and Relative Contribution In 2020, the statewide GHG emissions inventory was updated for 2000 to 2018 emissions using the GWPs in IPCC’s AR4.10 Based on these GWPs, California produced 425.3 MMTCO2e GHG emissions in 2018.

California’s transportation sector was the single largest generator of GHG emissions, producing 39.9 percent of the state’s total emissions. Industrial sector emissions made up 21.0 percent, and electric power generation 10 Methodology for determining the statewide GHG inventory is not the same as the methodology used to determine statewide GHG emissions under Assembly Bill 32 (2006).

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 20 ends

made up 14.8 percent of the state’s emissions inventory. Other major sectors of GHG emissions include commercial and residential (9.7 percent), agriculture and forestry (7.7 percent) high GWP (4.8 percent), and recycling and waste (2.1 percent) (CARB 2020a).

Since the peak level in 2004, California statewide GHG emissions dropped below the 2020 GHG limit of 431 MMCO2e in 2016 and have remained below the 2020 GHG limit since then. In 2018, emissions from routine GHG emitting activities statewide were 6 MMTCO2e lower than the 2020 GHG limit. Per capita GHG emissions in California have dropped from a 2001 peak of 14.0 MTCO2e per person to 10.7 MTCO2e per person in 2018, a 24 percent decrease. Transportation emissions decreased in 2018 compared to the previous year, which is the first year over year decrease since 2013. Since 2008, California’s electricity sector has followed an overall downward trend in emissions. In 2018, solar power generation has continued its rapid growth since 2013. Emissions from high-GWP gases increased 2.3 percent in 2018 (2000-2018 average year-over-year increase is 6.8 percent), continuing the increasing trend as they replace Ozone Depleting Substances (ODS) being phased out under the 1987 Montreal Protocol. Overall trends in the inventory also demonstrate that the carbon intensity of California’s economy (the amount of carbon pollution per million dollars of gross domestic product (GDP)) is declining, representing a 43 percent decline since the 2001 peak, while the state’s GDP has grown 59 percent during this period (CARB 2020a).

Regulatory Settings

REGULATION OF GHG EMISSIONS ON A NATIONAL LEVEL
The US Environmental Protection Agency (EPA) announced on December 7, 2009, that GHG emissions threaten the public health and welfare of the American people and that GHG emissions from on-road vehicles contribute to that threat. The EPA’s final findings respond to the 2007 U.S. Supreme Court decision that GHG emissions fit within the Clean Air Act definition of air pollutants. The findings do not in and of themselves impose any emission reduction requirements but allow the EPA to finalize the GHG standards proposed in 2009 for new light-duty vehicles as part of the joint rulemaking with the Department of Transportation (USEPA 2009).

To regulate GHGs from passenger vehicles, EPA was required to issue an endangerment finding. The finding identifies emissions of six key GHGs—CO2, CH4, N2O, hydrofluorocarbons, perfluorocarbons, and SF6—that have been the subject of scrutiny and intense analysis for decades by scientists in the United States and around the world. The first three are applicable to the project’s GHG emissions inventory because they constitute the majority of GHG emissions and, per South Coast AQMD guidance, are the GHG emissions that should be evaluated as part of a project’s GHG emissions inventory.

US Mandatory Report Rule for GHGs (2009)
In response to the endangerment finding, the EPA issued the Mandatory Reporting of GHG Rule that requires substantial emitters of GHG emissions (large stationary sources, etc.) to report GHG emissions data. Facilities that emit 25,000 MT or more of CO2 per year are required to submit an annual report.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 21 ends

Update to Corporate Average Fuel Economy Standards (2017 to 2026) The federal government issued new Corporate Average Fuel Economy (CAFE) standards in 2012 for model years 2017 to 2025, which required a fleet average of 54.5 miles per gallon in 2025. On March 30, 2020, the EPA finalized an updated CAFE and GHG emissions standards for passenger cars and light trucks and established new standards covering model years 2021 through 2026, known as the Safer Affordable Fuel Efficient (SAFE) Vehicles Final Rule for Model Years 2021 to 2026. However, in May 2020, California and 22 other states; the District of Columbia; the cities of Los Angeles, Denver, and New York; and the counties of San Francisco and Denver filed a lawsuit with the U.S. Court of Appeals for the District of Columbia Circuit, challenging the SAFE Rule. To date, a ruling has not been made on the lawsuit. In addition, a consortium of automakers and California have agreed on a voluntary framework to reduce emissions that can serve as an alternative path forward for clean vehicle standards nationwide. Automakers who agreed to the framework are Ford, Honda, BMW of North America, and Volkswagen Group of America. The framework supports continued annual reductions of vehicle GHG emissions through the 2026 model year, encourages innovation to accelerate the transition to electric vehicles, and gives industry the certainty needed to make investments and create jobs. This commitment means that the auto companies which are party to the voluntary agreement will only sell cars in the United States that meet these standards (CARB 2020b).

EPA Regulation of Stationary Sources under the Clean Air Act (Ongoing) Pursuant to its authority under the Clean Air Act, the EPA has been developing regulations for new, large, stationary sources of emissions, such as power plants and refineries. Under former President Obama’s 2013 Climate Action Plan, the EPA was directed to develop regulations for existing stationary sources as well. On June 19, 2019, the EPA issued the final Affordable Clean Energy (ACE) rule which became effective on August 19, 2019. The ACE rule was crafted under the direction of President Trump’s Energy Independence Executive Order. It officially rescinds the Clean Power Plan rule issued during the Obama Administration and sets emissions guidelines for states in developing plans to limit CO2 emissions from coal-fired power plants.

REGULATION OF GHG EMISSIONS ON A STATE LEVEL
Current State of California guidance and goals for reductions in GHG emissions are generally embodied in Executive Order S-3-05, Executive Order B-30-15, Assembly Bill 32 (AB 32), Senate Bill 32 (SB 32) and Senate Bill 375 (SB 375).

Executive Order S-3-05
Executive Order S-3-05, signed June 1, 2005. Executive Order S-3-05 set the following GHG reduction targets for the State:
 2000 levels by 2010
 1990 levels by 2020
 80 percent below 1990 levels by 2050

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 22 ends

Assembly Bill 32, the Global Warming Solutions Act (2006) Current State of California guidance and goals for reductions in GHG emissions are generally embodied in AB 32. AB 32 was passed by the California state legislature on August 31, 2006, to place the state on a course toward reducing its contribution of GHG emissions. AB 32 follows the 2020 tier of emissions reduction targets established in Executive Order S-03-05.

CARB 2008 Scoping Plan
The final Scoping Plan was adopted by CARB on December 11, 2008. The 2008 Scoping Plan identified that GHG emissions in California are anticipated to be approximately 596 MMTCO2e in 2020. In December 2007, CARB approved a 2020 emissions limit of 427 MMTCO2e (471 million tons) for the state (CARB 2008). In order to effectively implement the emissions cap, AB 32 directed CARB to establish a mandatory reporting system to track and monitor GHG emissions levels for large stationary sources that generate more than 25,000 MTCO2e per year, prepare a plan demonstrating how the 2020 deadline can be met, and develop appropriate regulations and programs to implement the plan by 2012.

First Update to the Scoping Plan
CARB completed a five-year update to the 2008 Scoping Plan, as required by AB 32. The First Update to the Scoping Plan was adopted at the May 22, 2014, board hearing. The update highlights California’s progress toward meeting the near-term 2020 GHG emission reduction goals defined in the original 2008 Scoping Plan.

As part of the update, CARB recalculated the 1990 GHG emission levels with the updated AR4 GWPs, and the 427 MMTCO2e 1990 emissions level and 2020 GHG emissions limit, established in response to AB 32, is slightly higher at 431 MMTCO2e (CARB 2014).

As identified in the Update to the Scoping Plan, California is on track to meeting the goals of AB 32. However, the update also addresses the state’s longer-term GHG goals within a post-2020 element. The post-2020 element provides a high-level view of a long-term strategy for meeting the 2050 GHG goals, including a recommendation for the state to adopt a midterm target. According to the Update to the Scoping Plan, local government reduction targets should chart a reduction trajectory that is consistent with or exceeds the trajectory created by statewide goals (CARB 2014). CARB identified that reducing emissions to 80 percent below 1990 levels will require a fundamental shift to efficient, clean energy in every sector of the economy. Progressing toward California’s 2050 climate targets will require significant acceleration of GHG reduction rates. Emissions from 2020 to 2050 will have to decline several times faster than the rate needed to reach the 2020 emissions limit (CARB 2014).

Executive Order B-30-15
Executive Order B-30-15, signed April 29, 2015, sets a goal of reducing GHG emissions in the state to 40 percent of 1990 levels by year 2030. Executive Order B-30-15 also directs CARB to update the Scoping Plan to quantify the 2030 GHG reduction goal for the state and requires state agencies to implement measures to meet the interim 2030 goal as well as the long-term goal for 2050 in Executive Order S-03-05. It also requires the Natural Resources Agency to conduct triennial updates of the California adaption strategy, Safeguarding California, in order to ensure climate change is accounted for in state planning and investment decisions.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 23 ends

Senate Bill 32 and Assembly Bill 197
In September 2016, Governor Brown signed SB 32 and AB 197 into law, making the Executive Order goal for year 2030 into a statewide mandated legislative target. AB 197 established a joint legislative committee on climate change policies and requires the CARB to prioritize direction emissions reductions rather than the market-based cap-and-trade program for large stationary, mobile, and other sources. 2017 Climate Change Scoping Plan Update
Executive Order B-30-15 and SB 32 required CARB to prepare another update to the Scoping Plan to address the 2030 target for the state. On December 24, 2017, CARB adopted the 2017 Climate Change Scoping Plan Update, which outlines potential regulations and programs, including strategies consistent with AB 197 requirements, to achieve the 2030 target. The 2017 Scoping Plan establishes a new emissions limit of 260 MMTCO2e for the year 2030, which corresponds to a 40 percent decrease in 1990 levels by 2030 (CARB 2017c).

California’s climate strategy will require contributions from all sectors of the economy, including enhanced focus on zero- and near-zero emission (ZE/NZE) vehicle technologies; continued investment in renewables, such as solar roofs, wind, and other types of distributed generation; greater use of low carbon fuels; integrated land conservation and development strategies; coordinated efforts to reduce emissions of short-lived climate pollutants (methane, black carbon, and fluorinated gases); and an increased focus on integrated land use planning, to support livable, transit-connected communities and conservation of agricultural and other lands.

Requirements for GHG reductions at stationary sources complement local air pollution control efforts by the local air districts to tighten criteria air pollutants and TACs emissions limits on a broad spectrum of industrial sources. Major elements of the 2017 Scoping Plan framework include:
 Implementing and/or increasing the standards of the Mobile Source Strategy, which include increasing ZEV buses and trucks;
 Low Carbon Fuel Standard (LCFS), with an increased stringency (18 percent by 2030).  Implementation of SB 350, which expands the Renewables Portfolio Standard (RPS) to 50 percent RPS and doubles energy efficiency savings by 2030.
 California Sustainable Freight Action Plan, which improves freight system efficiency, utilizes near-zero emissions technology, and deployment of ZEV trucks.
 Implementing the Short-Lived Climate Pollutant Strategy (SLPS), which focuses on reducing methane and hydrofluorocarbon emissions by 40 percent and anthropogenic black carbon emissions by 50 percent by year 2030.
 Post-2020 Cap-and-Trade Program that includes declining caps.  Continued implementation of SB 375.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 24 ends

 Development of a Natural and Working Lands Action Plan to secure California’s land base as a net carbon sink.

In addition to the statewide strategies listed above, the 2017 Climate Change Scoping Plan also identified local governments as essential partners in achieving the State’s long-term GHG reduction goals and identified local actions to reduce GHG emissions. As part of the recommended actions, CARB recommends statewide targets of no more than 6 MTCO2e or less per capita by 2030 and 2 MTCO2e or less per capita by 2050. CARB recommends that local governments evaluate and adopt robust and quantitative locally-appropriate goals that align with the statewide per capita targets and the State’s sustainable development objectives and develop plans to achieve the local goals. The statewide per capita goals were developed by applying the percent reductions necessary to reach the 2030 and 2050 climate goals (i.e., 40 percent and 80 percent, respectively) to the State’s 1990 emissions limit established under AB 32. For CEQA projects, CARB states that lead agencies have discretion to develop evidenced-based numeric thresholds (mass emissions, per capita, or per service population)—consistent with the Scoping Plan and the state’s long-term GHG goals. To the degree a project relies on GHG mitigation measures, CARB recommends that lead agencies prioritize on-site design features that reduce emissions, especially from VMT, and direct investments in GHG reductions within the project’s region that contribute potential air quality, health, and economic co-benefits. Where further project design or regional investments are infeasible or not proven to be effective, CARB recommends mitigating potential GHG impacts through purchasing and retiring carbon credits.

The Scoping Plan scenario is set against what is called the business-as-usual (BAU) yardstick—that is, what would the GHG emissions look like if the State did nothing at all beyond the existing policies that are required and already in place to achieve the 2020 limit, as shown in Table 9. It includes the existing renewables requirements, advanced clean cars, the “10 percent” Low Carbon Fuel Standard (LCFS), and the SB 375 program for more vibrant communities, among others. However, it does not include a range of new policies or measures that have been developed or put into statute over the past two years. Also shown in the table, the known commitments are expected to result in emissions that are 60 MMTCO2e above the target in 2030. If the estimated GHG reductions from the known commitments are not realized due to delays in implementation or technology deployment, the post-2020 Cap-and-Trade Program would deliver the additional GHG reductions in the sectors it covers to ensure the 2030 target is achieved.

Table 9 2017 Climate Change Scoping Plan Emissions Reductions Gap Modeling Scenario
2030 GHG Emissions
MMTCO2e
Reference Scenario (Business-as-Usual) 389
With Known Commitments 320
2030 GHG Target 260
Gap to 2030 Target 60
Source: CARB 2017c.

Table 10 provides estimated GHG emissions by sector, compared to 1990 levels, and the range of GHG emissions for each sector estimated for 2030.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 25 ends

Table 10 2017 Climate Change Scoping Plan Emissions Change by Sector Scoping Plan Sector
1990
MMTCO2e
2030 Proposed Plan Ranges
MMTCO2e % Change from 1990
Agricultural 26 24-25 -8% to -4%
Residential and Commercial 44 38-40 -14% to -9%
Electric Power 108 30-53 -72% to -51%
High GWP 3 8-11 267% to 367%
Industrial 98 83-90 -15% to -8%
Recycling and Waste 7 8-9 14% to 29%
Transportation (including TCU) 152 103-111 -32% to -27% Net Sink1 -7 TBD TBD
Sub Total 431 294-339 -32% to -21%
Cap-and-Trade Program NA 24-79 NA
Total 431 260 -40%
Source: CARB 2017c.

Notes: TCU = Transportation, Communications, and Utilities; TBD: To Be Determined. 1 Work is underway through 2017 to estimate the range of potential sequestration benefits from the natural and working lands sector.

Senate Bill 1383
On September 19, 2016, the Governor signed SB 1383 to supplement the GHG reduction strategies in the Scoping Plan to consider short-lived climate pollutants, including black carbon and CH4. Black carbon is the light-absorbing component of fine particulate matter produced during incomplete combustion of fuels. SB 1383 requires the state board, no later than January 1, 2018, to approve and begin implementing that comprehensive strategy to reduce emissions of short-lived climate pollutants to achieve a reduction in methane by 40 percent, hydrofluorocarbon gases by 40 percent, and anthropogenic black carbon by 50 percent below 2013 levels by 2030, as specified. The bill also establishes targets for reducing organic waste in landfill. On March 14, 2017, CARB adopted the “Final Proposed Short-Lived Climate Pollutant Reduction Strategy,” which identifies the state’s approach to reducing anthropogenic and biogenic sources of short-lived climate pollutants.

Anthropogenic sources of black carbon include on- and off-road transportation, residential wood burning, fuel combustion (charbroiling), and industrial processes. According to CARB, ambient levels of black carbon in California are 90 percent lower than in the early 1960s despite the tripling of diesel fuel use (CARB 2017b). Inuse on-road rules are expected to reduce black carbon emissions from on-road sources by 80 percent between 2000 and 2020. South Coast AQMD is one of the air districts that requires air pollution control technologies for chain-driven broilers, which reduces particulate emissions from these charbroilers by over 80 percent (CARB 2017b). Additionally, South Coast AQMD Rule 445 limits installation of new fireplaces in the SoCAB.

Senate Bill 375
In 2008, SB 375, the Sustainable Communities and Climate Protection Act, was adopted to connect the GHG emissions reductions targets established in the 2008 Scoping Plan for the transportation sector to local land use decisions that affect travel behavior. Its intent is to reduce GHG emissions from light-duty trucks and automobiles (excludes emissions associated with goods movement) by aligning regional long-range transportation plans, investments, and housing allocations to local land use planning to reduce VMT and vehicle

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 26 ends

trips. Specifically, SB 375 required CARB to establish GHG emissions reduction targets for each of the 18 metropolitan planning organizations (MPOs). The Southern California Association of Governments (SCAG) is the MPO for the Southern California region, which includes the counties of Los Angeles, Orange, San Bernardino, Riverside, Ventura, and Imperial.

Pursuant to the recommendations of the Regional Transportation Advisory Committee, CARB adopted per capita reduction targets for each of the MPOs rather than a total magnitude reduction target. SCAG’s targets are an 8 percent per capita reduction from 2005 GHG emission levels by 2020 and a 13 percent per capita reduction from 2005 GHG emission levels by 2035 (CARB 2010). The 2020 targets are smaller than the 2035 targets because a significant portion of the built environment in 2020 has been defined by decisions that have already been made. In general, the 2020 scenarios reflect that more time is needed for large land use and transportation infrastructure changes. Most of the reductions in the interim are anticipated to come from improving the efficiency of the region’s transportation network. The targets would result in 3 MMTCO2e of reductions by 2020 and 15 MMTCO2e of reductions by 2035. Based on these reductions, the passenger vehicle target in CARB’s Scoping Plan (for AB 32) would be met (CARB 2010). 2017 Update to the SB 375 Targets
CARB is required to update the targets for the MPOs every eight years. In June 2017, CARB released updated targets and technical methodology and recently released another update in February 2018. The updated targets consider the need to further reduce VMT, as identified in the 2017 Scoping Plan Update, while balancing the need for additional and more flexible revenue sources to incentivize positive planning and action toward sustainable communities. Like the 2010 targets, the updated SB 375 targets are in units of percent per capita reduction in GHG emissions from automobiles and light trucks relative to 2005. This excludes reductions anticipated from implementation of state technology and fuels strategies and any potential future state strategies such as statewide road user pricing. The proposed targets call for greater per capita GHG emission reductions from SB 375 than are currently in place, which for 2035, translate into proposed targets that either match or exceed the emission reduction levels in the MPOs’ currently adopted SCSs. As proposed, CARB staff ’s proposed targets would result in an additional reduction of over 8 MMTCO2e in 2035 compared to the current targets. For the next round of SCS updates, CARB’s updated targets for the SCAG region are an 8 percent per capita GHG reduction in 2020 from 2005 levels (unchanged from the 2010 target) and a 19 percent per capita GHG reduction in 2035 from 2005 levels (compared to the 2010 target of 13 percent) (CARB 2018). CARB adopted the updated targets and methodology on March 22, 2018. All SCSs adopted after October 1, 2018 are subject to these new targets.

SCAG’s Regional Transportation Plan / Sustainable Communities Strategy SB 375 requires each MPO to prepare a sustainable communities strategy in its regional transportation plan.

For the SCAG region, the draft 2020-2045 RTP/SCS (Connect SoCal) was adopted on May 7, 2020 for the limited purpose of transportation conformity (SCAG 2020). The Connect SoCal Plan was fully adopted in September 2020. In general, the SCS outlines a development pattern for the region that, when integrated with the transportation network and other transportation measures and policies, would reduce vehicle miles traveled from automobiles and light duty trucks and thereby reduce GHG emissions from these sources.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 27 ends

Connect SoCal focuses on the continued efforts of the previous RTP/SCSs to integrate transportation and land use strategies in development of the SCAG region through horizon year 2045 (SCAG 2020). Connect SoCal forecasts that the SCAG region will meet its GHG per capita reduction targets of 8 percent by 2020 and 19 percent by 2035. Additionally, Connect SoCal also forecasts that implementation of the plan will reduce VMT per capita in year 2045 by 4.1 percent compared to baseline conditions for that year. Connect SoCal includes a “Core Vision” that centers on maintaining and better managing the transportation network for moving people and goods while expanding mobility choices by locating housing, jobs, and transit closer together and increasing investments in transit and complete streets.

Assembly Bill 1493
California vehicle GHG emission standards were enacted under AB 1493 (Pavley I). Pavley I is a clean-car standard that reduces GHG emissions from new passenger vehicles (light-duty auto to medium-duty vehicles) from 2009 through 2016 and was anticipated to reduce GHG emissions from new passenger vehicles by 30 percent in 2016. California implements the Pavley I standards through a waiver granted to California by the EPA. In 2012, the EPA issued a Final Rulemaking that sets even more stringent fuel economy and GHG emissions standards for model year 2017 through 2025 light-duty vehicles (see also the discussion on the update to the Corporate Average Fuel Economy standards under Federal Laws, above). In January 2012, CARB approved the Advanced Clean Cars program (formerly known as Pavley II) for model years 2017 through 2025.

The program combines the control of smog, soot, and global warming gases and requirements for greater numbers of zero-emission vehicles into a single package of standards. Under California’s Advanced Clean Car program, by 2025, new automobiles will emit 34 percent fewer global warming gases and 75 percent fewer smog-forming emissions.

Executive Order S-01-07
On January 18, 2007, the state set a new LCFS for transportation fuels sold in the state. Executive Order S-01-07 sets a declining standard for GHG emissions measured in carbon dioxide equivalent gram per unit of fuel energy sold in California. The LCFS requires a reduction of 2.5 percent in the carbon intensity of California’s transportation fuels by 2015 and a reduction of at least 10 percent by 2020. The standard applies to refiners, blenders, producers, and importers of transportation fuels, and would use market-based mechanisms to allow these providers to choose how they reduce emissions during the “fuel cycle” using the most economically feasible methods.

Senate Bills 1078, 107, X1-2, and Executive Order S-14-08 A major component of California’s Renewable Energy Program is the RPS established under Senate Bills 1078 (Sher) and 107 (Simitian). Under the RPS, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least 1 percent in order to reach at least 20 percent by December 30, 2010.

Executive Order S-14-08 was signed in November 2008, which expanded the state’s Renewable Energy Standard to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1- 2). Renewable sources of electricity include wind, small hydropower, solar, geothermal, biomass, and biogas.

The increase in renewable sources for electricity production will decrease indirect GHG emissions from development projects, because electricity production from renewable sources is generally considered carbon neutral.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 28 ends

Senate Bill 350
Senate Bill 350 (de Leon), was signed into law in September 2015. SB 350 establishes tiered increases to the RPS of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. SB 350 also set a new goal to double the energy efficiency savings in electricity and natural gas through energy efficiency and conservation measures.

Senate Bill 100
On September 10, 2018, Governor Brown signed SB 100, which raises California’s RPS requirements to 60 percent by 2030, with interim targets, and 100 percent by 2045. The bill also establishes a state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under the bill, the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.

Executive Order B-55-18
Executive Order B-55-18, signed September 10, 2018, sets a goal “to achieve carbon neutrality as soon as possible, and no later than 2045, and achieve and maintain net negative emissions thereafter.” Executive Order B-55-18 directs CARB to work with relevant state agencies to ensure future Scoping Plans identify and recommend measures to achieve the carbon neutrality goal. The goal of carbon neutrality by 2045 is in addition to other statewide goals, meaning not only should emissions be reduced to 80 percent below 1990 levels by 2050, but that, by no later than 2045, the remaining emissions be offset by equivalent net removals of CO2e from the atmosphere, including through sequestration in forests, soils, and other natural landscapes.

Executive Order B-16-2012
On March 23, 2012, the state identified that CARB, the California Energy Commission (CEC), the Public Utilities Commission, and other relevant agencies worked with the Plug-in Electric Vehicle Collaborative and the California Fuel Cell Partnership to establish benchmarks to accommodate zero-emissions vehicles in major metropolitan areas, including infrastructure to support them (e.g., electric vehicle charging stations). The executive order also directs the number of zero-emission vehicles in California’s state vehicle fleet to increase through the normal course of fleet replacement so that at least 10 percent of fleet purchases of light-duty vehicles are zero-emission by 2015 and at least 25 percent by 2020. The executive order also establishes a target for the transportation sector of reducing GHG emissions from the transportation sector 80 percent below 1990 levels.

Executive Order N-79-20
On September 23, 2020 Governor Newsom signed Executive Order N-79-20 which identifies a goal that 100 percent of in-state sales of new passenger cars and trucks will be zero-emission by 2035. Additionally, this Executive Order identified fleet goals for trucks of 100 percent of drayage trucks be zero emissions by 2035 and 100 percent of medium- and heavy-duty vehicles in the State be zero-emission by 2045, for all operations where feasible. Additionally, the Executive Order identifies a goal for the State to transition to 100 percent zeroemission off-road vehicles and equipment by 2035 where feasible.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 29 ends

California Building Code: Building Energy Efficiency Standards Energy conservation standards for new residential and non-residential buildings were adopted by the California Energy Resources Conservation and Development Commission (now the CEC) in June 1977 and most recently revised in 2019 (Title 24, Part 6, of the California Code of Regulations [CCR]). Title 24 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow for consideration and possible incorporation of new energy efficiency technologies and methods. The 2019 Building Energy Efficiency Standards, which were adopted on May 9, 2018, went into effect on January 1, 2020.

The 2019 standards move towards cutting energy use in new homes by more than 50 percent and will require installation of solar photovoltaic systems for single-family homes and multi-family buildings of 3 stories and less. Four key areas the 2019 standards will focus on include 1) smart residential photovoltaic systems; 2) updated thermal envelope standards (preventing heat transfer from the interior to exterior and vice versa); 3) residential and nonresidential ventilation requirements; 4) and nonresidential lighting requirements (CEC 2018a). Under the 2019 standards, nonresidential buildings and multifamily residential buildings of four stories or more will be 30 percent more energy efficient compared to the 2016 standards while single-family homes will be 7 percent more energy efficient (CEC 2018b). When accounting for the electricity generated by the solar photovoltaic system, single-family homes would use 53 percent less energy compared to homes built to the 2016 standards (CEC 2018b).

California Building Code: CALGreen
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11, known as “CALGreen”) was adopted as part of the California Building Standards Code. CALGreen established planning and design standards for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants.11 The mandatory provisions of CALGreen became effective January 1, 2011. The CEC adopted the voluntary standards of the 2019 CALGreen on October 3, 2018. The 2019 CALGreen standards become effective January 1, 2020. 2006 Appliance Efficiency Regulations
The 2006 Appliance Efficiency Regulations (20 CCR §§ 1601–1608) were adopted by the CEC on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The regulations include standards for both federally regulated appliances and non–federally regulated appliances. Though these regulations are now often viewed as “business as usual,” they exceed the standards imposed by all other states, and they reduce GHG emissions by reducing energy demand.

Solid Waste Regulations
California’s Integrated Waste Management Act of 1989 (AB 939; Public Resources Code §§ 40050 et seq.) set a requirement for cities and counties throughout the state to divert 50 percent of all solid waste from landfills by January 1, 2000, through source reduction, recycling, and composting. In 2008, the requirements were modified to reflect a per capita requirement rather than tonnage. To help achieve this, the act requires that each 11 The green building standards became mandatory in the 2010 edition of the code.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 30 ends

city and county prepare and submit a source reduction and recycling element. AB 939 also established the goal for all California counties to provide at least 15 years of ongoing landfill capacity.

AB 341 (Chapter 476, Statutes of 2011) increased the statewide goal for waste diversion to 75 percent by 2020 and requires recycling of waste from commercial and multifamily residential land uses. Section 5.408 of the CALGreen also requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.

The California Solid Waste Reuse and Recycling Access Act (AB 1327; Public Resources Code §§ 42900 et seq.) requires areas to be set aside for collecting and loading recyclable materials in development projects. The act required the California Integrated Waste Management Board to develop a model ordinance for adoption by any local agency requiring adequate areas for collection and loading of recyclable materials as part of development projects. Local agencies are required to adopt the model or an ordinance of their own.

Section 5.408 of the 2019 CALGreen also requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.

In October of 2014, Governor Brown signed AB 1826, requiring businesses to recycle their organic waste on and after April 1, 2016, depending on the amount of waste they generate per week. This law also requires that on and after January 1, 2016, local jurisdictions across the state implement an organic waste recycling program to divert organic waste generated by businesses, including multifamily residential dwellings that consist of five or more units. Organic waste means food waste, green waste, landscape and pruning waste, nonhazardous wood waste, and food-soiled paper waste that is mixed in with food waste.

Water Efficiency Regulations
The 20x2020 Water Conservation Plan was issued by the Department of Water Resources (DWR) in 2010 pursuant to Senate Bill 7, which was adopted during the 7th Extraordinary Session of 2009–2010 and therefore dubbed “SBX7-7.” SBX7-7 mandated urban water conservation and authorized the DWR to prepare a plan implementing urban water conservation requirements (20x2020 Water Conservation Plan). In addition, it required agricultural water providers to prepare agricultural water management plans, measure water deliveries to customers, and implement other efficiency measures. SBX7-7 requires urban water providers to adopt a water conservation target of 20 percent reduction in urban per capita water use by 2020 compared to 2005 baseline use.

The Water Conservation in Landscaping Act of 2006 (AB 1881) requires local agencies to adopt the updated DWR model ordinance or equivalent. AB 1881 also requires the CEC to consult with the DWR to adopt, by regulation, performance standards and labeling requirements for landscape irrigation equipment, including irrigation controllers, moisture sensors, emission devices, and valves to reduce the wasteful, uneconomic, inefficient, or unnecessary consumption of energy or water.

Thresholds of Significance
The CEQA Guidelines recommend that a lead agency consider the following when assessing the significance of impacts from GHG emissions on the environment:

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 31 ends

1. The extent to which the project may increase (or reduce) GHG emissions as compared to the existing environmental setting;

2. Whether the project emissions exceed a threshold of significance that the lead agency determines applies to the project;

3. The extent to which the project complies with regulations or requirements adopted to implement an adopted statewide, regional, or local plan for the reduction or mitigation of GHG emissions.12

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
To provide guidance to local lead agencies on determining significance for GHG emissions in their CEQA documents, South Coast AQMD has convened a GHG CEQA Significance Threshold Working Group (Working Group). Based on the last Working Group meeting (Meeting No. 15) held in September 2010, South Coast AQMD is proposing to adopt a tiered approach for evaluating GHG emissions for development projects where South Coast AQMD is not the lead agency (South Coast AQMD 2010):
 Tier 1. If a project is exempt from CEQA, project-level and cumulative GHG emissions are less than significant.
 Tier 2. If the project complies with a GHG emissions reduction plan or mitigation program that avoids or substantially reduces GHG emissions in the project’s geographic area (i.e., city or county), project-level and cumulative GHG emissions are less than significant.  Tier 3. If GHG emissions are less than the screening-level threshold, project-level and cumulative GHG emissions are less than significant.

For projects that are not exempt or where no qualifying GHG reduction plans are directly applicable, South Coast AQMD requires an assessment of GHG emissions. South Coast AQMD is proposing a screeninglevel threshold of 3,000 MTCO2e annually for all land use types or the following land-use-specific thresholds: 1,400 MTCO2e for commercial projects, 3,500 MTCO2e for residential projects, or 3,000 MTCO2e for mixed-use projects. These bright-line thresholds are based on a review of the Governor’s Office of Planning and Research database of CEQA projects. Based on their review of 711 CEQA projects, 90 percent of CEQA projects would exceed the bright-line thresholds identified above. Therefore, projects that do not exceed the bright-line threshold would have a nominal, and therefore, less than cumulatively considerable impact on GHG emissions:
12 The Governor’s Office of Planning and Research recommendations include a requirement that such a plan must be adopted through a public review process and include specific requirements that reduce or mitigate the project’s incremental contribution of GHG emissions. If there is substantial evidence that the possible effects of a particular project are still cumulatively considerable, notwithstanding compliance with the adopted regulations or requirements, an EIR must be prepared for the project.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 32 ends

 Tier 4. If emissions exceed the screening threshold, a more detailed review of the project’s GHG emissions is warranted.

The South Coast AQMD Working Group has identified an efficiency target for projects that exceed the screening threshold of 4.8 MTCO2e per year per service population (MTCO2e/year/SP) for project-level analyses and 6.6 MTCO2e/year/SP for plan level projects (e.g., program-level projects such as general plans) for the year 2020.13 The per capita efficiency targets are based on the AB 32 GHG reduction target and 2020 GHG emissions inventory prepared for CARB’s 2008 Scoping Plan.

For purposes of this analysis, because the proposed project has an anticipated opening year post-2020, the bright-line screening-level criterion of 3,000 MTCO2e/yr is used as the significance threshold for this project.

Therefore, if the project operation-phase emissions exceed the 3,000 MTCO2e/yr threshold, GHG emissions would be considered potentially significant in the absence of mitigation measures. 13 It should be noted that the Working Group also considered efficiency targets for 2035 for the first time in this Working Group meeting.

Page 33 ends

BIBLIOGRAPHY
Bay Area Air Quality Management District (BAAQMD). 2017, May. California Environmental Quality Act Air Quality Guidelines. https://www.baaqmd.gov/~/media/files/planning-andresearch/ceqa/ceqa_guidelines_may2017-pdf.pdf?la=en.

California Air Pollution Control Officers Association (CAPCOA). 2021. California Emissions Estimator Model (CalEEMod). Version 2020.4. Prepared by: BREEZE Software, A Division of Trinity Consultants in collaboration with South Coast Air Quality Management District and the California Air Districts.

California Air Resources Board (CARB). 1998, April 22. The Report on Diesel Exhaust. http://www.arb.ca.gov/toxics/dieseltac/de-fnds.htm.
———. 1999. California Air Resources Board (CARB). Final Staff Report: Update to the Toxic Air Contaminant List. https://www.arb.ca.gov/toxics/finalreport.pdf ———. 2005, April. Air Quality and Land Use Handbook: A Community Health Perspective. https://www.arb.ca.gov/ch/handbook.pdf.
———. 2008, October. Climate Change Proposed Scoping Plan, a Framework for Change. https://ww2.arb.ca.gov/sites/default/files/classic//cc/scopingplan/document/psp.pdf ———. 2010, September. Staff Report Proposed Regional Greenhouse Gas Emission Reduction Targets for Automobiles and Light Trucks Pursuant to Senate Bill 375. https://ww3.arb.ca.gov/board/res/2010/res10-31.pdf.
———. 2014, May 15. First Update to the Climate Change Scoping Plan: Building on the Framework, Pursuant to AB 32, The California Global Warming Solutions Act of 2006. https://ww2.arb.ca.gov/sites/default/files/classic/cc/scopingplan/2013_update/first_update_clima te_change_scoping_plan.pdf.
———. 2016, October 1. Ambient Air Quality Standards. https://ww2.arb.ca.gov/sites/default/files/2020- 07/aaqs2.pdf.
———. 2017a, March 14. Final Proposed Short-Lived Climate Pollutant Reduction Strategy. https://www.arb.ca.gov/cc/shortlived/shortlived.htm.
———. 2017c, November. California’s 2017 Climate Change Scoping Plan: The Strategy for Achieving California’s 2030 Greenhouse Gas Target.
https://www.arb.ca.gov/cc/scopingplan/scoping_plan_2017.pdf. ———. 2018, February. Proposed Update to the SB 375 Greenhouse Gas Emission Reduction Targets. https://www.arb.ca.gov/cc/sb375/sb375_target_update_final_staff_report_feb2018.pdf.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 34 ends

———. 2020a. 2020 California Greenhouse Gas 2000-2018 Emissions Trends and Indicators Report. https://ww3.arb.ca.gov/cc/inventory/pubs/reports/2000_2018/ghg_inventory_trends_00-18.pdf. ———. 2020b, September 5 (accessed). California and major automakers reach groundbreaking framework agreement on clean emission standards. https://ww2.arb.ca.gov/news/california-and-majorautomakers-reach-groundbreaking-framework-agreement-clean-emission. ———. 2021a, Area Designations Maps/State and National. Accessed July 2, 2021. https://ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations. ———. 2021b, September 28 (accessed). Air Pollution Data Monitoring Cards (2016, 2017, 2018, 2019, and 2020). http://www.arb.ca.gov/adam/topfour/topfour1.php.

California Energy Commission (CEC). 2018a. News Release: Energy Commission Adopts Standards Requiring Solar Systems for New Homes, First in Nation. https://www.energy.ca.gov/news/2018- 05/energy-commission-adopts-standards-requiring-solar-systems-new-homes-first. ———.2018b. 2019 Building Energy and Efficiency Standards Frequently Asked Questions. https://www.energy.ca.gov/sites/default/files/2020-
03/Title_24_2019_Building_Standards_FAQ_ada.pdf.

Intergovernmental Panel on Climate Change (IPCC). 1995. Second Assessment Report: Climate Change 1995. https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_sar_wg_I_full_report.pdf. ———. 2001. Third Assessment Report: Climate Change 2001. New York: Cambridge University Press. https://www.ipcc.ch/site/assets/uploads/2018/03/WGI_TAR_full_report.pdf. ———. 2007. Fourth Assessment Report: Climate Change 2007. New York: Cambridge University Press. https://www.ipcc.ch/site/assets/uploads/2018/02/ar4_syr_full_report.pdf. ———. 2013. Fifth Assessment Report: Climate Change 2013. New York: Cambridge University Press. https://www.ipcc.ch/site/assets/uploads/2018/02/WG1AR5_all_final.pdf.

South Coast Air Quality Management District (South Coast AQMD). 1992. Federal Attainment Plan for Carbon Monoxide.
———. 1993. California Environmental Quality Act Air Quality Handbook. https://www.dtscssfl.com/files/lib_ceqa/ref_draft_peir/Chap4_2-AirQuality/SCAQMD_1993_- _CEQA_Handbook.pdf.
———. 2005, May. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. http://www.aqmd.gov/docs/default-source/planning/air-quality-guidance/completeguidance-document.pdf.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKGROUND AND MODELING DATA

Page 35 ends

———. 2008a, July. Final Localized Significance Threshold Methodology. http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/finallst-methodology-document.pdf. ———. 2008b, September. Multiple Air Toxics Exposure Study in the South Coast Air Basin (MATES III). https://www.aqmd.gov/home/air-quality/air-quality-studies/health-studies/mates-iii. ———.2011. Fact Sheet for Applying CalEEMod to Localized Significance Thresholds. http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/caleemod-guidance.pdf?sfvrsn=2. ———. 2010, September 28. Greenhouse Gases (GHG) CEQA Significance Thresholds Working Group Meeting 15. http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases-(ghg)- ceqa-significance-thresholds/year-2008-2009/ghg-meeting-15/ghg-meeting-15-mainpresentation.pdf. ———. 2012, May 4. Final 2012 Lead State Implementation Plan: Los Angeles County. http://www3.aqmd.gov/hb/attachments/2011-2015/2012May/2012-May4-030.pdf. ———. 2013, February. 2012 Final Air Quality Management Plan. https://www.aqmd.gov/docs/defaultsource/clean-air-plans/air-quality-management-plans/2012-air-quality-management-plan/final-2012- aqmp-(february-2013)/main-document-final-2012.pdf.
———. 2015a, October 3. Final Report Multiple Air Toxics Exposure Study in the South Coast Air Basin (MATES IV). https://www.aqmd.gov/home/air-quality/air-quality-studies/health-studies/mates-iv. ———. 2015b. Health Effects of Air Pollution. http://www.aqmd.gov/docs/defaultsource/publications/brochures/the-health-effects-of-air-pollution-brochure.pdf. ———. 2015c, October. “Blueprint for Clean Air: 2016 AQMP White Paper.” 2016 AQMP White Papers Web Page. https://www.aqmd.gov/docs/default-source/Agendas/aqmp/white-paper-workinggroups/wp-blueprint-final.pdf?sfvrsn=2. ———. 2017, March 4. Final 2016 Air Quality Management Plan. https://www.aqmd.gov/docs/defaultsource/clean-air-plans/air-quality-management-plans/2016-air-quality-management-plan/final-2016- aqmp/final2016aqmp.pdf?sfvrsn=15.
———. 2019, April (revised). South Coast AQMD Air Quality Significance Thresholds. http://www.aqmd.gov/docs/default-source/ceqa/handbook/scaqmd-air-quality-significancethresholds.pdf.

Southern California Association of Governments (SCAG). 2016, April. The 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS): A Plan for Mobility, Accessibility, Sustainability, and a High Quality of Life. https://scag.ca.gov/sites/main/files/fileattachments/f2016rtpscs.pdf?1606005557.

THE MERCURY PROJECT - INITIAL STUDY

AIR QUALITY AND GREENHOUSE GAS BACKG ROUND AND MODELING DATA

Page 36 ends

———. 2020, May 7. Adopted Connect SoCal Plan: The 2020-2045 Regional Transportation Plan / Sustainable Communities Strategy of The Southern California Association of Governments. https://www.connectsocal.org/Pages/Connect-SoCal-Final-Plan.aspx US Environmental Protection Agency (USEPA). 2009, December. EPA: Greenhouse Gases Threaten Public Health and the Environment. Science overwhelmingly shows greenhouse gas concentrations at unprecedented levels due to human activity.
https://archive.epa.gov/epapages/newsroom_archive/newsreleases/08d11a451131bca58525768500 5bf252.html.
———. 2020, September 10 (accessed). Overview of Greenhouse Gases. http://www3.epa.gov/climatechange/ghgemissions/gases.html. ———. 2021, February 18 (updated). Criteria Air Pollutants. https://www.epa.gov/criteria-air-pollutants Western Regional Climate Center (WRCC). 2021, March 3 (accessed). Montebello, California ([Station ID] 045790): Period of Record Monthly Climate Summary, 01/01/1979 to 02/26/2011. Western U.S.

Climate Summaries. https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca5790.

Assumptions Worksheet

CalEEMod Inputs - The Mercury Project, Construction
Name: The Mercury Project Project Number: OPL-01
Project Location: 8825 Washington Boulevard County/Air Basin: Los AngelesClimate Zone: 9Land Use Setting: UrbanOperational Year: 2023Utility Company: Southern California EdisonAir Basin: South Coast Air BasinAir District: SCAQMDSRA: 5 - Southeast LA County Proiect Site Acreage 2.85
Disturbed Site Acreage 2.85
Project Components SQFT Tons
Demolition
Asphalt Demolition 124,146 1,839
New Construction Number of Units SQFT ACRES Number of Floors Apartments 255 258,720 0.99 6
Ground-level Lobby/Leasing Space 1,500 0.00Rooftop Recreation and Pool Deck 17,010 0.00 Total Residential Area 277,230 0.99
Retail 5,730 0.00
Total Non-Residential Area 5,730 0.00
Parking Structure* 190,000 0.34
Other Asphalt Surfaces 45,000 1.03Total Landscaping: 21,000 0.48 * assigning remaining area to parking structure
CalEEMod Land Use Inputs
Land Use Type Land Use Subtype Unit Amount Size Metric Lot Acreage* Land Use Square FeetResidential Apartments (Mid-Rise) 255 DU 0.99 260,220Recreational Recreational Swimming Pool 17.010 1000 sqft 0.00 17,010 Retail Regional Shopping Center 5.730 1000 sqft 0.00 5,730Parking Enclosed Parking Structure with Elevator 190.000 1000 sqft 0.34 190,000 Parking Other Asphalt Surfaces 45.000 1000 sqft 1.03 45,000Parking Other Non-asphalt Surfaces 21.000 1000 sqft 0.48 21,000

2.85 Demolition
Component
Amount to be Demolished
(Tons) Haul Truck Capacity (Tons)1 Haul Distance (miles)2 Total Trip Ends Duration (days) Trip Ends/Day Total Asphalt Demo 1,839 20 19 184 5 37
Total 1,839 184
1 CalEEMod default truck capacity2 Based on distance to Azusa Transfer Station provided by applicant Soil Haul 1
Construction Activities Volume (CY) Haul Truck Capacity (cy)1 Haul Distance (miles)2 Total Trip Ends Total Days Trip Ends/Day Rough Grading (Export) 7,400 14 19 1058 12 88Fine Grading (Export) 20,000 14 19 2858 20 143 1 CalEEMod default truck capacity2 Based on distance to Azusa Transfer Station provided by applicant Architectural Coating
Percentage of Proposed Buildings'
Interior Painted: 100%
Percentage of Proposed Buildings'
Exterior Painted: 100%
Rule 1113
Interior Paint VOC content: 50 grams per liter
Exterior Paint VOC content: 50 grams per liter
Structures Land Use Square Feet CalEEMod Factor2 Total Paintable Surface Area Paintable Interior Area1 Paintable Exterior Area1 Total Residential Area3
Apartments (Mid-Rise) 277,230 2.7 748,521 561,391 187,130 561,391 187,130
Total Non-Residential
Retail 5,730 2.0 11,460 8,595 2,865Parking Structure 190,000 2.0 380,000 285,000 95,000 293,595 97,865
Parking Structure 190,000 6% 11,400 11,400
11,400 11,400
Construction Mitigation
SCAQMD Rule 403Replace Ground Cover PM10: 5 % ReductionReplace Ground Cover PM2.5: 5 % ReductionWater Exposed Area Frequency: 2 per day PM10: 55 % ReductionPM25: 55 % Reduction
Unpaved Roads Vehicle Speed: 15 mphSCAQMD Rule 1186 Clean Paved Road 9 % PM Reduction 1CalEEMod methodology calculates the paintable interior and exterior areas by multiplying the total paintable surface area by 75 and 25 percent, respectively. 2 The program assumes the total surface for painting equals 2.7 times the floor square footage for residential and 2 times that for nonresidential square footage defined by the user. Architectural coatings for the parking lot is based on CalEEMod methodology applied to a surface parking lot (i.e., striping), in which 6% of surface area is painted. 3 Total Residential coating includes the swimming pool area and leasing office Construction Activities and Schedule Assumptions: The Mercury Project Construction Activities Phase Type Start Date End Date
CalEEMod
Duration
(Workday)
Asphalt Demolition Demolition 1/1/2022 2/22/2022 37
Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 5 Site Preparation Site Preparation 2/23/2022 3/2/2022 6
Rough Grading Grading 3/3/2022 4/13/2022 30
Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 12
Utility Trenching Trenching 4/14/2022 7/6/2022 60
Fine Grading Grading 5/12/2022 6/8/2022 20
Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 20
Building Construction Building Construction 5/12/2022 12/1/2023 407 Paving Paving 10/11/2023 11/6/2023 19
Architectural Coating Architectural Coating 11/7/2023 12/1/2023 19 Construction Schedule
based on durations provided by Applicant
Construction Activities Start Date End Date
CalEEMod Duration
(Workday)
Asphalt Demolition 1/1/2022 2/15/2022 32
Asphalt Demolition and Debris Haul 2/16/2022 2/22/2022 5 Site Preparation 2/23/2022 3/2/2022 6
Rough Grading 3/3/2022 3/28/2022 18
Rough Grading and Soil Haul 3/29/2022 4/13/2022 12
Utilities Trenching 4/14/2022 5/11/2022 20
Utilities Trenching, Fine Grading and Soil Haul, and
Building Construction 2022 5/12/2022 6/8/2022 20
Utilities Trenching and Building Construction 2022 6/9/2022 7/6/2022 20 Building Construction 2022 7/7/2022 12/31/2022 127
Building Construction 2023 1/1/2023 10/10/2023 202
Building Construction 2023 and Paving 10/11/2023 11/6/2023 19 Building Construction 2023 and Architectural Coating 11/7/2023 12/1/2023 19 Overlapping Construction Schedule
CalEEMod Construction Off-Road Equipment Inputs
*Based on equipment mix provided by the Applicant.

General Construction Hours: btwn 7:00 AM to 4:00 PM (with 1 hr break), Mon-Fri Construction Equipment Details
Equipment Model Type # of Equipment hr/day hp load factor* total trips/Day Asphalt Demolition
Concrete/Industrial Saws 1 8 81 0.73
Rubber Tired Dozers 1 8 247 0.4
Tractors/Loaders/Backhoes 3 8 97 0.37
Worker Trips 13
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 0
Water Trucks 2
Asphalt Demolition Debris Haul
Worker Trips 0
Vendor Trips 0
Hauling Trips 184
Site Preparation
Graders 1 8 187 0.41
Scrapers 1 8 367 0.48
Tractors/Loaders/Backhoes CAT 966 Loader 1 7 276 0.37
Worker Trips 8
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 0
Water Trucks 2
Rough Grading
Excavators Deere 350 1 8 270 0.38
Graders 1 8 187 0.41
Rollers 1 8 134 0.38
Rubber Tired Dozers 1 8 247 0.4
Scrapers 1 8 367 0.48
Tractors/Loaders/Backhoes 2 7 97 0.37
Worker Trips 18
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 0
Water Trucks 2
Rough Grading Soil Haul
Worker Trips 0
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 1,058
*10 dump trucks provided by applicant accounted for in hauling trips Utility Trenching
Excavators Hitachi 300 Excavator 1 6 249 0.38
Plate Compactors 5 8 7 0.43
Tractors/Loaders/Backhoes Cat 950 Loader 1 8 225 0.37
Trenchers 1 8 50 0.5
Worker Trips 20
Vendor Trips 4
Hauling Trips (TOTAL TRIPS) 0
*2 dump trucks included as vendor trips, assumes 2 vendor trips per dump truck Fine Grading
Tractors/Loaders/Backhoes 1 8 225 0.37
Hand Compactors 5 8 6.8 0.43
Worker Trips 15
Vendor Trips 4
Hauling Trips (TOTAL TRIPS) 0
Water Trucks 2
*2 dump trucks included as vendor trips, assumes 2 vendor trips per dump truck no additional equipment required for Grading Soil Haul
no additional equipment required for Asphalt Demolition Haul Fine Grading Soil Haul
Worker Trips 0
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 2,858
*10 dump trucks provided by applicant accounted for in hauling trips Building Construction
Cranes 1 8 231 0.29
Forklifts 2 7 89 0.2
Generator Sets 1 8 84 0.74
Tractors/Loaders/Backhoes 1 6 97 0.37
Welders 3 8 46 0.45
Worker Trips 60
Vendor Trips 3
Hauling Trips (TOTAL TRIPS) 0
* 60 worker and 3 vendor trips provided by Applicant
Paving
Cement and Mortar Mixers 1 8 9 0.56
Pavers 1 8 130 0.42
Paving Equipment 1 8 132 0.36
Rollers 2 8 80 0.38
Tractors/Loaders/Backhoes 1 8 97 0.37
Worker Trips 15
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 0
Architectural Coating*
Air Compressors 1 6 78 0.48
Worker Trips 12
Vendor Trips 0
Hauling Trips (TOTAL TRIPS) 0
* Architectural coating worker trips is assumed to be 20% of building construction worker trips based on CalEEMod Appendix A calculations. no additional equipment required for Grading Soil Haul
CalEEMod Inputs - The Mercury Project, Operations
Name: The Mercury Project, OperationsProject Number: OPL-01Project Location: 8825 Washington Boulevard County/Air Basin: Los AngelesClimate Zone: 9Land Use Setting: UrbanOperational Year: 2023Utility Company: Southern California EdisonAir Basin: South Coast Air BasinAir District: SCAQMDSRA: 5 - Southeast LA County Proiect Site Acreage 2.85
Disturbed Site Acreage 2.85
CalEEMod Land Use Inputs
Land Use Type Land Use Subtype Unit Amount Size Metric Lot Acreage Land Use Square FeetResidential Apartments (Mid-Rise) 255 DU 0.99 260,220Recreational Recreational Swimming Pool 17.50 1000 sqft 0.00 17,500Retail Regional Shopping Center 2.87 1000 sqft 0.00 2,865 Recreational
High Turn-Over (Sit Down Restaurant) 2.87 1000 sqft 0.00 2,865 Parking
Enclosed Parking Structure with Elevator 190.00 1000 sqft 0.34 190,000 Parking Other Asphalt Surfaces 45.00 1000 sqft 1.03 45,000Parking Other Non-asphalt Surfaces 21.00 1000 sqft 0.48 21,000

2.85 Trips
Land Use Type Average Daily Trips CalEEMod Trip Rate Saturday Trips1 CalEEMod Trip Rate Sunday Trips1 CalEEMod Trip Apartments (Mid-Rise) 1,165 4.57 1,165 4.57 1,165 4.57
Regional Shopping Center 113 39.27 113 39.27 113 39.27
Restaurant 317 110.47 317 110.47 317 110.47
Total 1,594 1,594 1,594
1 assumes that Saturday and Sunday trips are the same as weekday trips Number of Residents 962
VMT per Capita1 12.21
Apartments Daily Weekday VMT 11,746
1 includes TDM measures
Trips Average Trip Length (mi/trip)
Annual Vehicle Miles
Traveled2
Apartment 10.08 4,275,551
Regional Shopping Center1 9.45 387,043
Restaurant1 8.81 1,015,195
Total 5,677,790
Source: LLG. 2021, June.
1 CalEEMod defaults2 Annual VMT is calculated based on weekday VMT x 364 days per year.

Primary Diverted Passby
Apartments (Mid-Rise) 86% 11% 3%
Restaurant 37% 20% 43%
Regional Shopping Center 54% 35% 11%
Adjusted Trip Type Percentages 100% 0% 0%
Water Use (CalEEMod Defaults)
Land Use Indoor Outdoor Total
Apartments Mid Rise 16,614,277 10,474,218 27,088,494
Enclosed Parking with Elevator 0 00High Turnover (Sit Down Restaurant) 834,718 53,280 887,998Other Asphalt Surfaces 0 00Other Non-Asphalt Surfaces 0 00Recreational Swimming Pool 798,432 489,362 1,287,794Regional Shopping Center 203,699 124,848 328,547 *Assumes 100% aerobic treatment.

Solid Waste (CalEEMod Defaults)
Land Use (tons/year)
Apartments Mid Rise 117.30
Enclosed Parking with Elevator 0.00High Turnover (Sit Down Restaurant) 32.73Other Asphalt Surfaces 0.00Other Non-Asphalt Surfaces 0.00Recreational Swimming Pool 76.95Regional Shopping Center 2.89Architectural Coating Percentage of Proposed Buildings' Interior
Painted: 100%
Percentage of Proposed Buildings' Exterior
Painted: 100%
Rule 1113
Interior Paint VOC content: 50 grams per liter
Exterior Paint VOC content: 50 grams per liter
Structures Land Use Square Feet CalEEMod Factor2
Total Paintable
Surface Area
Paintable Interior
Area1
Paintable Exterior
Area1
Total Residential Area3
Apartments (Mid-Rise) 277,720 2.7 749,844 562,383 187,461 562,383 187,461
Total Non-Residential4
Retail 5,730 2.0 11,460 8,595 2,865Parking Structure 190,000 2.0 380,000 285,000 95,000 293,595 97,865
Parking Structure 190,000 6% 11,400 11,400
11,400 11,400
Trip Type Percentages
1CalEEMod methodology calculates the paintable interior and exterior areas by multiplying the total paintable surface area by 75 and 25 percent, respectively. 2 The program assumes the total surface for painting equals 2.7 times the floor square footage for residential and 2 times that for nonresidential square footage defined by the user. Architectural coatings for the parking lot is based on CalEEMod methodology applied to a surface parking lot (i.e., striping), in which 6% of surface area is painted. 3 Total Residential coating includes the swimming pool area and leasing office4 Total Non-Residential does not include interior and exterior painting of the parking structure.

Fireplaces
*assuming no woodstoves
Land Use # Wood # Gas # Propane # No Fireplace Hours/Day Days/Year1 BTU/hr/firepl
ace KBTU
Grill2 0 3 0 252 3 104 60,000.00 56,160.00
Average Use 0 3 0 252 3 104 60,000 56,160
1 assumes weekend use only2 assumes grills and firepits will consume 60,000 BTU/hr (CalEEMod default BTU for fireplace) Electricity (Buildings)
Based on the Electricity and Natural Gas Energy Intensity default information from CalEEMod, which complies with 2019 Building Energy Efficiency StandardsPico Rivera Innovative Municipal Energy CO2:1 683.98 pounds per megawatt hour
CH4:1 0.033 pound per megawatt hour
N2O:1 0.004 pound per megawatt hour
1 CalEEMod default values.

Global Warming Potentials (GWP)
AR4 AR5
CO2 11
CH4 25 28
N2O 298 265
Based on Intergovernmental Panel on Climate Change Fourth Assessment Report global warming potentials for CH4 and N2O; Intergovernmental Panel on Climate Change (IPCC).

Changes to the CalEEMod Defaults - Fleet Mix 2023
Weekday Trips 1,577
Default LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH FleetMix (Model Default) 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374 100% Trips 859 99 296 201 36 10 17 13 1 1 38 1 5 1,577
Percent 82% 13% 5% 100%
without buses/MH 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0 0 0.024394 0.000698 0.003374 100% Percent 82% 13% 5% 100%
Adjusted without buses/MH 0.544785 0.062844 0.187478 0.127235 0.023775 0.006264 0.010786 0.008250 0.000000 0.000000 0.025118 0.000719 0.003474 Percent adjusted 82% 13% 5% 100%
Assumed Mix 97.0% 2.00% 1.00% 100%
adjusted with Assumed 0.644264 0.074319 0.221712 0.020000 0.004463 0.001176 0.002025 0.001549 0.000000 0.000000 0.029705 0.000135 0.000652 100% Percent Check: 97% 2% 1%
Trips 1,016 117 350 32 7 2 3 2 0 0 47 0 1 1,577
1,530 32 15
Fleet mix for the project is modified to reflect a higher proportion of passenger vehicles that the regional VMT. Assumes a mix of approximately 97% passenger vehicles, 2% medium duty trucks, and 1% heavy duty trucks and buses.

Construction Trips Worksheet
Phase Name
Worker Trip Ends
Per Day
Vendor Trip Ends
Per Day
Haul Truck Trip
Ends Per Day
Total Haul Truck
Trip Ends Start Date End Date Workdays
Asphalt Demolition 13 2 0 0 1/1/2022 2/22/2022 37
Asphalt Demolition Debris Haul 0 0 37 184 2/16/2022 2/22/2022 5 Site Preparation 8 2 0 0 2/23/2022 3/2/2022 6
Rough Grading 18 2 0 0 3/3/2022 4/13/2022 30
Rough Grading Soil Haul 0 0 89 1,058 3/29/2022 4/13/2022 12 Utility Trenching 20 4 0 0 4/14/2022 7/6/2022 60
Building Construction 60 3 0 0 5/12/2022 12/1/2023 407
Fine Grading 15 6 0 0 10/31/2023 11/6/2023 5
Fine Grading Soil Haul 0 0 2,858 2,858 11/6/2023 11/6/2023 1 Paving 15 0 0 0 10/11/2023 11/6/2023 19
Architectural Coating 12 0 0 0 11/7/2023 12/1/2023 19
Construction Activity (Overlapping)
Worker Trip Ends
Per Day
Vendor Trip Ends
Per Day
Haul Truck Trip
Ends Per Day
Total Trip Ends Per
Day Start Date End Date Workdays
Asphalt Demolition 13 2 0 15 1/1/2022 2/15/2022 32
Asphalt Demolition and Debris Haul 13 2 37 2/16/2022 2/22/2022 5 Site Preparation 8 2 0 2/23/2022 3/2/2022 6
Rough Grading 18 2 0 3/3/2022 3/28/2022 18
Rough Grading and Soil Haul 18 2 89 3/29/2022 4/13/2022 12 Utilities Trenching 20 4 0 4/14/2022 5/11/2022 20
Utilities Trenching and Building Construction 2022 80 7 0 5/12/2022 7/6/2022 40 Building Construction 2022 60 3 0 7/7/2022 12/31/2022 127 Building Construction 2023 60 3 0 63 1/1/2023 10/10/2023 202 Building Construction 2023 and Paving 75 3 0 78 10/11/2023 10/30/2023 14 Building Construction 2023, Paving, and Fine Grading 90 9 0 99 10/31/2023 11/5/2023 4 Building Construction 2023, Fine Grading and Soil Haul, and Paving 90 9 2,858 2957 11/6/2023 11/6/2023 1
Building Construction 2023 and Architectural Coating 72 3 0 75 11/7/2023 12/1/2023 19 Maximum Daily Trips 90 9 2858 2957
Demo Haul Trip Calculation
Conversion factors*

0.046 ton/SF

1.2641662 tons/cy
20 tons

15.82070459 CY

0.791035229 CY/ton
Building BSF Demo Tons/SF Tons Haul Truck (CY) Haul Truck (Ton) Round Trips Total Trip Ends Combined Building Demo 0 0.046 0 16 20.00 0 0
*CalEEMod User's Guide Version 2016.3.2, Appendix A
Pavement Volume to Weight Conversion
Component
Total SF of
Area1
Assumed
Thickness
(foot)2
Debris Volume
(cu. ft)
Weight of
Crushed
Asphalt
(lbs/cf)3
AC Mass
(lbs) AC Mass (tons)
Asphalt 124,146 0.333 41,382 89 3,678,400 1839.20
Total 124,146 1839.20
1 Based on information provided by applicant.
3 https://www.calrecycle.ca.gov/swfacilities/cdi/Tools/Calculations 2 Pavements and Surface Materials. Nonpoint Education for Municipal Officials, Technical Paper Number 8. University of Connecticut Cooperative Extension System, 1999.

Emissions Worksheet

Regional Construction Emissions Worksheet:

Asphalt Demolition
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Off-Road 1.69 16.62 13.96 0.02 0.84 0.78
Total 1.69 16.62 13.96 0.02 0.84 0.78
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.05 0.03 0.51 0.00 0.13 0.04
Total 0.05 0.13 0.55 0.00 0.15 0.04
TOTAL 1.74 16.75 14.51 0.03 0.99 0.82
Onsite 2022 Winter
Off-Road 1.69 16.62 13.96 0.02 0.84 0.78
Total 1.69 16.62 13.96 0.02 0.84 0.78
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.05 0.04 0.47 0.00 0.13 0.04
Total 0.05 0.14 0.50 0.00 0.15 0.04
TOTAL 1.74 16.76 14.47 0.03 0.99 0.82
Onsite 2022
Off-Road 1.69 16.62 13.96 0.02 0.84 0.78
Total 1.69 16.62 13.96 0.02 0.84 0.78
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.05 0.04 0.51 0.00 0.13 0.04
Total 0.05 0.14 0.55 0.00 0.15 0.04
TOTAL 1.74 16.76 14.51 0.03 0.99 0.82
Asphalt Demolition Debris Haul
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 3.36 0.51
Offsite
Hauling 0.16 5.91 1.39 0.02 0.61 0.20
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.16 5.91 1.39 0.02 0.61 0.20
TOTAL 0.16 5.91 1.39 0.02 3.98 0.71
Onsite 2022 Winter
Fugitive Dust 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 3.36 0.51
Offsite
Hauling 0.16 6.15 1.42 0.02 0.61 0.20
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.16 6.15 1.42 0.02 0.61 0.20
TOTAL 0.16 6.15 1.42 0.02 3.98 0.71
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 3.36 0.51
Offsite
Hauling 0.16 6.15 1.42 0.02 0.61 0.20
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.16 6.15 1.42 0.02 0.61 0.20
TOTAL 0.16 6.15 1.42 0.02 3.98 0.71
Site Preparation
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.68 0.07
Off-Road 1.49 16.47 10.12 0.03 0.60 0.55
Total 1.49 16.47 10.12 0.03 1.28 0.63
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.03 0.02 0.31 0.00 0.08 0.02
Total 0.03 0.12 0.35 0.00 0.10 0.03
TOTAL 1.52 16.58 10.46 0.03 1.38 0.65
Onsite 2022 Winter
Fugitive Dust 0.68 0.07
Off-Road 1.49 16.47 10.12 0.03 0.60 0.55
Total 1.49 16.47 10.12 0.03 1.28 0.63
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.03 0.02 0.29 0.00 0.08 0.02
Total 0.03 0.12 0.32 0.00 0.10 0.03
TOTAL 1.52 16.59 10.44 0.03 1.38 0.65
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.68 0.07
Off-Road 1.49 16.47 10.12 0.03 0.60 0.55
Total 1.49 16.47 10.12 0.03 1.28 0.63
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.03 0.02 0.31 0.00 0.08 0.02
Total 0.03 0.12 0.35 0.00 0.10 0.03
TOTAL 1.52 16.59 10.46 0.03 1.38 0.65
Rough Grading
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 3.48 1.51
Off-Road 2.74 29.35 20.13 0.05 1.23 1.13
Total 2.74 29.35 20.13 0.05 4.71 2.64
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.06 0.05 0.71 0.00 0.19 0.05
Total 0.07 0.14 0.74 0.00 0.20 0.06
TOTAL 2.80 29.49 20.87 0.05 4.91 2.70
Onsite 2022 Winter
Fugitive Dust 3.48 1.51
Off-Road 2.74 29.35 20.13 0.05 1.23 1.13
Total 2.74 29.35 20.13 0.05 4.71 2.64
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.07 0.05 0.65 0.00 0.19 0.05
Total 0.07 0.15 0.69 0.00 0.20 0.06
TOTAL 2.81 29.50 20.82 0.05 4.91 2.70
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 3.48 1.51
Off-Road 2.74 29.35 20.13 0.05 1.23 1.13
Total 2.74 29.35 20.13 0.05 4.71 2.64
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.07 0.05 0.71 0.00 0.19 0.05
Total 0.07 0.15 0.74 0.00 0.20 0.06
TOTAL 2.81 29.50 20.87 0.05 4.91 2.70
Rough Grading Soil Haul
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.03 0.00
Offsite
Hauling 0.40 14.15 3.34 0.05 1.47 0.48
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.40 14.15 3.34 0.05 1.47 0.48
TOTAL 0.40 14.15 3.34 0.05 1.50 0.48
Onsite 2022 Winter
Fugitive Dust 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.03 0.00
Offsite
Hauling 0.39 14.73 3.40 0.05 1.47 0.48
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.39 14.73 3.40 0.05 1.47 0.48
TOTAL 0.39 14.73 3.40 0.05 1.50 0.48
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.03 0.00
Offsite
Hauling 0.40 14.73 3.40 0.05 1.47 0.48
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.40 14.73 3.40 0.05 1.47 0.48
TOTAL 0.40 14.73 3.40 0.05 1.50 0.48
Utilities Trenching
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Off-Road 0.95 7.57 5.99 0.02 0.32 0.30
Total 0.95 7.57 5.99 0.02 0.32 0.30
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.20 0.07 0.00 0.03 0.01
Worker 0.07 0.05 0.79 0.00 0.21 0.06
Total 0.08 0.25 0.85 0.00 0.23 0.07
TOTAL 1.03 7.82 6.84 0.02 0.55 0.36
Onsite 2022 Winter
Off-Road 0.95 7.57 5.99 0.02 0.32 0.30
Total 0.95 7.57 5.99 0.02 0.32 0.30
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.20 0.07 0.00 0.03 0.01
Worker 0.07 0.06 0.72 0.00 0.21 0.06
Total 0.08 0.26 0.79 0.00 0.23 0.07
TOTAL 1.04 7.83 6.78 0.02 0.55 0.36
Onsite 2022
Off-Road 0.95 7.57 5.99 0.02 0.32 0.30
Total 0.95 7.57 5.99 0.02 0.32 0.30
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.20 0.07 0.00 0.03 0.01
Worker 0.07 0.06 0.79 0.00 0.21 0.06
Total 0.08 0.26 0.85 0.00 0.23 0.07
TOTAL 1.04 7.83 6.84 0.02 0.55 0.36
Fine Grading
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.00 0.00
Off-Road 0.45 3.95 2.63 0.01 0.14 0.13
Total 0.45 3.95 2.63 0.01 0.14 0.13
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.29 0.10 0.00 0.04 0.01
Worker 0.05 0.04 0.59 0.00 0.16 0.04
Total 0.06 0.33 0.69 0.00 0.19 0.06
TOTAL 0.51 4.28 3.32 0.01 0.34 0.19
Onsite 2022 Winter
Fugitive Dust 0.00 0.00
Off-Road 0.45 3.95 2.63 0.01 0.14 0.13
Total 0.45 3.95 2.63 0.01 0.14 0.13
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.31 0.10 0.00 0.04 0.01
Worker 0.06 0.04 0.54 0.00 0.16 0.04
Total 0.07 0.35 0.65 0.00 0.19 0.06
TOTAL 0.52 4.30 3.27 0.01 0.34 0.19
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00
Off-Road 0.45 3.95 2.63 0.01 0.14 0.13
Total 0.45 3.95 2.63 0.01 0.14 0.13
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.31 0.10 0.00 0.04 0.01
Worker 0.06 0.04 0.59 0.00 0.16 0.04
Total 0.07 0.35 0.69 0.00 0.19 0.06
TOTAL 0.52 4.30 3.32 0.01 0.34 0.19
Fine Grading Soil Haul
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.05 0.01
Offsite
Hauling 0.64 22.94 5.41 0.08 2.38 0.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.64 22.94 5.41 0.08 2.38 0.77
TOTAL 0.64 22.94 5.41 0.08 2.43 0.78
Onsite 2022 Winter
Fugitive Dust 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.05 0.01
Offsite
Hauling 0.62 23.87 5.51 0.08 2.38 0.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.62 23.87 5.51 0.08 2.38 0.77
TOTAL 0.62 23.87 5.51 0.08 2.43 0.78
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.05 0.01
Offsite
Hauling 0.64 23.87 5.51 0.08 2.38 0.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.64 23.87 5.51 0.08 2.38 0.77
TOTAL 0.64 23.87 5.51 0.08 2.43 0.78
Building Construction 2022
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.04 0.00 0.02 0.01
Worker 0.19 0.13 2.17 0.01 0.62 0.17
Total 0.20 0.25 2.21 0.01 0.64 0.17
TOTAL 1.91 13.87 16.43 0.03 1.25 0.76
Onsite 2022 Winter
Off-Road 1.86 14.60 14.35 0.03 0.70 0.67
Total 1.86 14.60 14.35 0.03 0.70 0.67
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.15 0.05 0.00 0.02 0.01
Worker 0.22 0.17 2.17 0.01 0.62 0.17
Total 0.23 0.32 2.22 0.01 0.64 0.18
TOTAL 2.08 14.92 16.57 0.03 1.34 0.85
Onsite 2022
Off-Road 1.86 14.60 14.35 0.03 0.70 0.67
Total 1.86 14.60 14.35 0.03 0.70 0.67
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.15 0.05 0.00 0.02 0.01
Worker 0.22 0.17 2.17 0.01 0.62 0.17
Total 0.23 0.32 2.22 0.01 0.64 0.18
TOTAL 2.08 14.92 16.57 0.03 1.34 0.85
Building Construction 2023
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2023 Summer
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.04 0.00 0.02 0.01
Worker 0.19 0.13 2.17 0.01 0.62 0.17
Total 0.20 0.25 2.21 0.01 0.64 0.17
TOTAL 1.91 13.87 16.43 0.03 1.25 0.76
Onsite 2023 Winter
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.05 0.00 0.02 0.01
Worker 0.21 0.15 1.99 0.01 0.62 0.17
Total 0.21 0.27 2.04 0.01 0.64 0.17
TOTAL 1.92 13.89 16.25 0.03 1.25 0.76
Onsite 2023
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.05 0.00 0.02 0.01
Worker 0.21 0.15 2.17 0.01 0.62 0.17
Total 0.21 0.27 2.21 0.01 0.64 0.17
TOTAL 1.92 13.89 16.43 0.03 1.25 0.76
Paving 2023
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2023 Summer
Off-Road 0.88 8.61 11.68 0.02 0.43 0.40
Paving 0.14 0.00 0.00
Total 1.02 8.61 11.68 0.02 0.43 0.40
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.05 0.03 0.54 0.00 0.16 0.04
Total 0.05 0.03 0.54 0.00 0.16 0.04
TOTAL 1.07 8.64 12.23 0.02 0.59 0.44
Onsite 2023 Winter
Off-Road 0.88 8.61 11.68 0.02 0.43 0.40
Paving 0.14 0.00 0.00
Total 1.02 8.61 11.68 0.02 0.43 0.40
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.05 0.04 0.50 0.00 0.16 0.04
Total 0.05 0.04 0.50 0.00 0.16 0.04
TOTAL 1.07 8.65 12.18 0.02 0.59 0.44
Onsite 2023
Off-Road 0.88 8.61 11.68 0.02 0.43 0.40
Paving 0.14 0.00 0.00 0.00 0.00 0.00
Total 1.02 8.61 11.68 0.02 0.43 0.40
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.05 0.04 0.54 0.00 0.16 0.04
Total 0.05 0.04 0.54 0.00 0.16 0.04
TOTAL 1.07 8.65 12.23 0.02 0.59 0.44
Architectural Coating
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2023 Summer
Archit. Coating 137.36 0.00 0.00
Off-Road 0.19 1.30 1.81 0.00 0.07 0.07
Total 137.55 1.30 1.81 0.00 0.07 0.07
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.04 0.03 0.43 0.00 0.12 0.03
Total 0.04 0.03 0.43 0.00 0.12 0.03
TOTAL 137.59 1.33 2.24 0.00 0.20 0.10
Onsite 2023 Winter
Archit. Coating 141.81 0.00 0.00
Off-Road 0.19 1.30 1.81 0.00 0.07 0.07
Total 142.01 1.30 1.81 0.00 0.07 0.07
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.04 0.03 0.40 0.00 0.12 0.03
Total 0.04 0.03 0.40 0.00 0.12 0.03
TOTAL 142.05 1.33 2.21 0.00 0.20 0.10
Onsite 2023
Archit. Coating 141.81 0.00 0.00 0.00 0.00 0.00
Off-Road 0.19 1.30 1.81 0.00 0.07 0.07
Total 142.01 1.30 1.81 0.00 0.07 0.07
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.04 0.03 0.43 0.00 0.12 0.03
Total 0.04 0.03 0.43 0.00 0.12 0.03
TOTAL 142.05 1.33 2.24 0.00 0.20 0.10
ROG NOx CO SO2 PM10 Total PM2.5 Total
Asphalt Demolition 2 17 15 0 1 1
Asphalt Demolition and Debris Haul 2 23 16 0 5 2
Site Preparation 2 17 10 0 1 1
Rough Grading 3 30 21 0 5 3
Rough Grading and Soil Haul 3 44 24 0 6 3
Utilities Trenching 1 8 7 0 1 0
Utilities Trenching, Fine Grading and Soil Haul,
and Building Construction 2022 4 51 32 0 5 2
Utilities Trenching and Building Construction
2022 3 23 23 0 2 1
Building Construction 2022 2 15 17 0 1 1
Building Construction 2023 2 14 16 0 1 1
Building Construction 2023 and Paving 3 23 29 0 2 1
Building Construction 2023 and Architectural
Coating 144 15 19 0 1 1
MAX DAILY 144 51 32 0 6 3
Regional Thresholds 75 100 550 150 150 55
Exceeds Thresholds? Yes No No No No No
Regional Construction Emissions Worksheet (Mitigated):

Asphalt Demolition
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Off-Road 1.69 16.62 13.96 0.02 0.84 0.78
Total 1.69 16.62 13.96 0.02 0.84 0.78
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.05 0.03 0.51 0.00 0.13 0.04
Total 0.05 0.13 0.55 0.00 0.15 0.04
TOTAL 1.74 16.75 14.51 0.03 0.99 0.82
Onsite 2022 Winter
Off-Road 1.69 16.62 13.96 0.02 0.84 0.78
Total 1.69 16.62 13.96 0.02 0.84 0.78
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.05 0.04 0.47 0.00 0.13 0.04
Total 0.05 0.14 0.50 0.00 0.15 0.04
TOTAL 1.74 16.76 14.47 0.03 0.99 0.82
Onsite 2022
Off-Road 1.69 16.62 13.96 0.02 0.84 0.78
Total 1.69 16.62 13.96 0.02 0.84 0.78
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.05 0.04 0.51 0.00 0.13 0.04
Total 0.05 0.14 0.55 0.00 0.15 0.04
TOTAL 1.74 16.76 14.51 0.03 0.99 0.82
Asphalt Demolition Debris Haul
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 3.36 0.51
Offsite
Hauling 0.16 5.91 1.39 0.02 0.61 0.20
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.16 5.91 1.39 0.02 0.61 0.20
TOTAL 0.16 5.91 1.39 0.02 3.98 0.71
Onsite 2022 Winter
Fugitive Dust 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 3.36 0.51
Offsite
Hauling 0.16 6.15 1.42 0.02 0.61 0.20
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.16 6.15 1.42 0.02 0.61 0.20
TOTAL 0.16 6.15 1.42 0.02 3.98 0.71
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 3.36 0.51
Offsite
Hauling 0.16 6.15 1.42 0.02 0.61 0.20
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.16 6.15 1.42 0.02 0.61 0.20
TOTAL 0.16 6.15 1.42 0.02 3.98 0.71
Site Preparation
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.68 0.07
Off-Road 1.49 16.47 10.12 0.03 0.60 0.55
Total 1.49 16.47 10.12 0.03 1.28 0.63
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.03 0.02 0.31 0.00 0.08 0.02
Total 0.03 0.12 0.35 0.00 0.10 0.03
TOTAL 1.52 16.58 10.46 0.03 1.38 0.65
Onsite 2022 Winter
Fugitive Dust 0.68 0.07
Off-Road 1.49 16.47 10.12 0.03 0.60 0.55
Total 1.49 16.47 10.12 0.03 1.28 0.63
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.03 0.02 0.29 0.00 0.08 0.02
Total 0.03 0.12 0.32 0.00 0.10 0.03
TOTAL 1.52 16.59 10.44 0.03 1.38 0.65
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.68 0.07
Off-Road 1.49 16.47 10.12 0.03 0.60 0.55
Total 1.49 16.47 10.12 0.03 1.28 0.63
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.03 0.02 0.31 0.00 0.08 0.02
Total 0.03 0.12 0.35 0.00 0.10 0.03
TOTAL 1.52 16.59 10.46 0.03 1.38 0.65
Rough Grading
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 3.48 1.51
Off-Road 2.74 29.35 20.13 0.05 1.23 1.13
Total 2.74 29.35 20.13 0.05 4.71 2.64
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.06 0.05 0.71 0.00 0.19 0.05
Total 0.07 0.14 0.74 0.00 0.20 0.06
TOTAL 2.80 29.49 20.87 0.05 4.91 2.70
Onsite 2022 Winter
Fugitive Dust 3.48 1.51
Off-Road 2.74 29.35 20.13 0.05 1.23 1.13
Total 2.74 29.35 20.13 0.05 4.71 2.64
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.07 0.05 0.65 0.00 0.19 0.05
Total 0.07 0.15 0.69 0.00 0.20 0.06
TOTAL 2.81 29.50 20.82 0.05 4.91 2.70
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 3.48 1.51
Off-Road 2.74 29.35 20.13 0.05 1.23 1.13
Total 2.74 29.35 20.13 0.05 4.71 2.64
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.10 0.03 0.00 0.01 0.00
Worker 0.07 0.05 0.71 0.00 0.19 0.05
Total 0.07 0.15 0.74 0.00 0.20 0.06
TOTAL 2.81 29.50 20.87 0.05 4.91 2.70
Rough Grading Soil Haul
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.03 0.00
Offsite
Hauling 0.40 14.15 3.34 0.05 1.47 0.48
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.40 14.15 3.34 0.05 1.47 0.48
TOTAL 0.40 14.15 3.34 0.05 1.50 0.48
Onsite 2022 Winter
Fugitive Dust 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.03 0.00
Offsite
Hauling 0.39 14.73 3.40 0.05 1.47 0.48
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.39 14.73 3.40 0.05 1.47 0.48
TOTAL 0.39 14.73 3.40 0.05 1.50 0.48
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.03 0.00
Offsite
Hauling 0.40 14.73 3.40 0.05 1.47 0.48
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.40 14.73 3.40 0.05 1.47 0.48
TOTAL 0.40 14.73 3.40 0.05 1.50 0.48
Utilities Trenching
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Off-Road 0.95 7.57 5.99 0.02 0.32 0.30
Total 0.95 7.57 5.99 0.02 0.32 0.30
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.20 0.07 0.00 0.03 0.01
Worker 0.07 0.05 0.79 0.00 0.21 0.06
Total 0.08 0.25 0.85 0.00 0.23 0.07
TOTAL 1.03 7.82 6.84 0.02 0.55 0.36
Onsite 2022 Winter
Off-Road 0.95 7.57 5.99 0.02 0.32 0.30
Total 0.95 7.57 5.99 0.02 0.32 0.30
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.20 0.07 0.00 0.03 0.01
Worker 0.07 0.06 0.72 0.00 0.21 0.06
Total 0.08 0.26 0.79 0.00 0.23 0.07
TOTAL 1.04 7.83 6.78 0.02 0.55 0.36
Onsite 2022
Off-Road 0.95 7.57 5.99 0.02 0.32 0.30
Total 0.95 7.57 5.99 0.02 0.32 0.30
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.20 0.07 0.00 0.03 0.01
Worker 0.07 0.06 0.79 0.00 0.21 0.06
Total 0.08 0.26 0.85 0.00 0.23 0.07
TOTAL 1.04 7.83 6.84 0.02 0.55 0.36
Fine Grading
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.00 0.00
Off-Road 0.45 3.95 2.63 0.01 0.14 0.13
Total 0.45 3.95 2.63 0.01 0.14 0.13
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.29 0.10 0.00 0.04 0.01
Worker 0.05 0.04 0.59 0.00 0.16 0.04
Total 0.06 0.33 0.69 0.00 0.19 0.06
TOTAL 0.51 4.28 3.32 0.01 0.34 0.19
Onsite 2022 Winter
Fugitive Dust 0.00 0.00
Off-Road 0.45 3.95 2.63 0.01 0.14 0.13
Total 0.45 3.95 2.63 0.01 0.14 0.13
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.31 0.10 0.00 0.04 0.01
Worker 0.06 0.04 0.54 0.00 0.16 0.04
Total 0.07 0.35 0.65 0.00 0.19 0.06
TOTAL 0.52 4.30 3.27 0.01 0.34 0.19
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00
Off-Road 0.45 3.95 2.63 0.01 0.14 0.13
Total 0.45 3.95 2.63 0.01 0.14 0.13
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.31 0.10 0.00 0.04 0.01
Worker 0.06 0.04 0.59 0.00 0.16 0.04
Total 0.07 0.35 0.69 0.00 0.19 0.06
TOTAL 0.52 4.30 3.32 0.01 0.34 0.19
Fine Grading Soil Haul
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Fugitive Dust 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.05 0.01
Offsite
Hauling 0.64 22.94 5.41 0.08 2.38 0.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.64 22.94 5.41 0.08 2.38 0.77
TOTAL 0.64 22.94 5.41 0.08 2.43 0.78
Onsite 2022 Winter
Fugitive Dust 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.05 0.01
Offsite
Hauling 0.62 23.87 5.51 0.08 2.38 0.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.62 23.87 5.51 0.08 2.38 0.77
TOTAL 0.62 23.87 5.51 0.08 2.43 0.78
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.05 0.01
Offsite
Hauling 0.64 23.87 5.51 0.08 2.38 0.77
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.64 23.87 5.51 0.08 2.38 0.77
TOTAL 0.64 23.87 5.51 0.08 2.43 0.78
Building Construction 2022
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2022 Summer
Off-Road 1.86 14.60 14.35 0.03 0.70 0.67
Total 1.86 14.60 14.35 0.03 0.70 0.67
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.15 0.05 0.00 0.02 0.01
Worker 0.21 0.15 2.36 0.01 0.62 0.17
Total 0.21 0.30 2.41 0.01 0.64 0.18
TOTAL 2.07 14.90 16.77 0.03 1.34 0.85
Onsite 2022 Winter
Off-Road 1.86 14.60 14.35 0.03 0.70 0.67
Total 1.86 14.60 14.35 0.03 0.70 0.67
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.15 0.05 0.00 0.02 0.01
Worker 0.22 0.17 2.17 0.01 0.62 0.17
Total 0.23 0.32 2.22 0.01 0.64 0.18
TOTAL 2.08 14.92 16.57 0.03 1.34 0.85
Onsite 2022
Off-Road 1.86 14.60 14.35 0.03 0.70 0.67
Total 1.86 14.60 14.35 0.03 0.70 0.67
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.01 0.15 0.05 0.00 0.02 0.01
Worker 0.22 0.17 2.36 0.01 0.62 0.17
Total 0.23 0.32 2.41 0.01 0.64 0.18
TOTAL 2.08 14.92 16.77 0.03 1.34 0.85
Building Construction 2023
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2023 Summer
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.04 0.00 0.02 0.01
Worker 0.19 0.13 2.17 0.01 0.62 0.17
Total 0.20 0.25 2.21 0.01 0.64 0.17
TOTAL 1.91 13.87 16.43 0.03 1.25 0.76
Onsite 2023 Winter
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.05 0.00 0.02 0.01
Worker 0.21 0.15 1.99 0.01 0.62 0.17
Total 0.21 0.27 2.04 0.01 0.64 0.17
TOTAL 1.92 13.89 16.25 0.03 1.25 0.76
Onsite 2023
Off-Road 1.71 13.62 14.21 0.03 0.61 0.59
Total 1.71 13.62 14.21 0.03 0.61 0.59
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.12 0.05 0.00 0.02 0.01
Worker 0.21 0.15 2.17 0.01 0.62 0.17
Total 0.21 0.27 2.21 0.01 0.64 0.17
TOTAL 1.92 13.89 16.43 0.03 1.25 0.76
Paving 2023
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2023 Summer
Off-Road 0.88 8.61 11.68 0.02 0.43 0.40
Paving 0.14 0.00 0.00
Total 1.02 8.61 11.68 0.02 0.43 0.40
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.05 0.03 0.54 0.00 0.16 0.04
Total 0.05 0.03 0.54 0.00 0.16 0.04
TOTAL 1.07 8.64 12.23 0.02 0.59 0.44
Onsite 2023 Winter
Off-Road 0.88 8.61 11.68 0.02 0.43 0.40
Paving 0.14 0.00 0.00
Total 1.02 8.61 11.68 0.02 0.43 0.40
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.05 0.04 0.50 0.00 0.16 0.04
Total 0.05 0.04 0.50 0.00 0.16 0.04
TOTAL 1.07 8.65 12.18 0.02 0.59 0.44
Onsite 2023
Off-Road 0.88 8.61 11.68 0.02 0.43 0.40
Paving 0.14 0.00 0.00 0.00 0.00 0.00
Total 1.02 8.61 11.68 0.02 0.43 0.40
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.05 0.04 0.54 0.00 0.16 0.04
Total 0.05 0.04 0.54 0.00 0.16 0.04
TOTAL 1.07 8.65 12.23 0.02 0.59 0.44
Architectural Coating
ROG NOx CO SO2 PM10 Total PM2.5 Total
Onsite 2023 Summer
Archit. Coating 36.43 0.00 0.00
Off-Road 0.19 1.30 1.81 0.00 0.07 0.07
Total 36.62 1.30 1.81 0.00 0.07 0.07
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.04 0.03 0.43 0.00 0.12 0.03
Total 0.04 0.03 0.43 0.00 0.12 0.03
TOTAL 36.66 1.33 2.24 0.00 0.20 0.10
Onsite 2023 Winter
Archit. Coating 37.54 0.00 0.00
Off-Road 0.19 1.30 1.81 0.00 0.07 0.07
Total 37.73 1.30 1.81 0.00 0.07 0.07
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.04 0.03 0.40 0.00 0.12 0.03
Total 0.04 0.03 0.40 0.00 0.12 0.03
TOTAL 37.78 1.33 2.21 0.00 0.20 0.10
Onsite 2023
Archit. Coating 37.54 0.00 0.00 0.00 0.00 0.00
Off-Road 0.19 1.30 1.81 0.00 0.07 0.07
Total 37.73 1.30 1.81 0.00 0.07 0.07
Offsite
Hauling 0.00 0.00 0.00 0.00 0.00 0.00
Vendor 0.00 0.00 0.00 0.00 0.00 0.00
Worker 0.04 0.03 0.43 0.00 0.12 0.03
Total 0.04 0.03 0.43 0.00 0.12 0.03
TOTAL 37.78 1.33 2.24 0.00 0.20 0.10
ROG NOx CO SO2 PM10 Total PM2.5 Total
Asphalt Demolition 2 17 15 0 1 1
Asphalt Demolition and Debris Haul 2 23 16 0 5 2
Site Preparation 2 17 10 0 1 1
Rough Grading 3 30 21 0 5 3
Rough Grading and Soil Haul 3 44 24 0 6 3
Utilities Trenching 1 8 7 0 1 0
Utilities Trenching, Fine Grading and Soil Haul,
and Building Construction 2022 4 51 32 0 5 2
Utilities Trenching and Building Construction
2022 3 23 24 0 2 1
Building Construction 2022 2 15 17 0 1 1
Building Construction 2023 2 14 16 0 1 1
Building Construction 2023 and Paving 3 23 29 0 2 1
Building Construction 2023 and Architectural
Coating 40 15 19 0 1 1
MAX DAILY 40 51 32 0 6 3
Regional Thresholds 75 100 550 150 150 55
Exceeds Thresholds? No No No No No No
Construction LST Worksheet:

Asphalt Demolition
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Off-Road 16.62 13.96 0.84 0.78
Total 16.62 13.96 0.84 0.78
TOTAL 16.62 13.96 0.84 0.78
Onsite 2022
Off-Road 16.62 13.96 0.84 0.78
Total 16.62 13.96 0.84 0.78
TOTAL 16.62 13.96 0.84 0.78
Onsite 2022
Off-Road 16.62 13.96 0.84 0.78
Total 16.62 13.96 0.84 0.78
TOTAL 16.62 13.96 0.84 0.78
Asphalt Demolition Debris Haul
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Fugitive Dust 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 3.36 0.51
TOTAL 0.00 0.00 3.36 0.51
Onsite 2022
Fugitive Dust 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 3.36 0.51
Offsite
Hauling 6.15 1.42 0.61 0.20
Vendor 0.00 0.00 0.00 0.00
Worker 0.00 0.00 0.00 0.00
Total 6.15 1.42 0.61 0.20
TOTAL 6.15 1.42 3.98 0.71
Onsite 2022
Fugitive Dust 0.00 0.00 3.36 0.51
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 3.36 0.51
TOTAL 6.15 1.42 3.98 0.71
Site Preparation
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Fugitive Dust 0.68 0.07
Off-Road 16.47 10.12 0.60 0.55
Total 16.47 10.12 1.28 0.63
TOTAL 16.47 10.12 1.28 0.63
Onsite 2022
Fugitive Dust 0.68 0.07
Off-Road 16.47 10.12 0.60 0.55
Total 16.47 10.12 1.28 0.63
TOTAL 16.47 10.12 1.28 0.63
Onsite 2022
Fugitive Dust 0.00 0.00 0.68 0.07
Off-Road 16.47 10.12 0.60 0.55
Total 16.47 10.12 1.28 0.63
TOTAL 16.47 10.12 1.28 0.63
Rough Grading
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Fugitive Dust 3.48 1.51
Off-Road 29.35 20.13 1.23 1.13
Total 29.35 20.13 4.71 2.64
TOTAL 29.35 20.13 4.71 2.64
Onsite 2022
Fugitive Dust 3.48 1.51
Off-Road 29.35 20.13 1.23 1.13
Total 29.35 20.13 4.71 2.64
TOTAL 29.35 20.13 4.71 2.64
Onsite 2022
Fugitive Dust 0.00 0.00 3.48 1.51
Off-Road 29.35 20.13 1.23 1.13
Total 29.35 20.13 4.71 2.64
TOTAL 29.35 20.13 4.71 2.64
Rough Grading Soil Haul
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Fugitive Dust 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.03 0.00
TOTAL 0.00 0.00 0.03 0.00
Onsite 2022
Fugitive Dust 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.03 0.00
TOTAL 0.00 0.00 0.03 0.00
Onsite 2022
Fugitive Dust 0.00 0.00 0.03 0.00
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.03 0.00
TOTAL 0.00 0.00 0.03 0.00
Utilities Trenching
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Off-Road 7.57 5.99 0.32 0.30
Total 7.57 5.99 0.32 0.30
TOTAL 7.57 5.99 0.32 0.30
Onsite 2022
Off-Road 7.57 5.99 0.32 0.30
Total 7.57 5.99 0.32 0.30
TOTAL 7.57 5.99 0.32 0.30
Onsite 2022
Off-Road 7.57 5.99 0.32 0.30
Total 7.57 5.99 0.32 0.30
TOTAL 7.57 5.99 0.32 0.30
Fine Grading
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Fugitive Dust 0.00 0.00
Off-Road 3.95 2.63 0.14 0.13
Total 3.95 2.63 0.14 0.13
TOTAL 3.95 2.63 0.14 0.13
Onsite 2022
Fugitive Dust 0.00 0.00
Off-Road 3.95 2.63 0.14 0.13
Total 3.95 2.63 0.14 0.13
TOTAL 3.95 2.63 0.14 0.13
Onsite 2022
Fugitive Dust 0.00 0.00 0.00 0.00
Off-Road 3.95 2.63 0.14 0.13
Total 3.95 2.63 0.14 0.13
TOTAL 3.95 2.63 0.14 0.13
Fine Grading Soil Haul
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Fugitive Dust 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.05 0.01
TOTAL 0.00 0.00 0.05 0.01
Onsite 2022
Fugitive Dust 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.05 0.01
TOTAL 0.00 0.00 0.05 0.01
Onsite 2022
Fugitive Dust 0.00 0.00 0.05 0.01
Off-Road 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.05 0.01
TOTAL 0.00 0.00 0.05 0.01
Building Construction 2022
NOx CO PM10 Total PM2.5 Total
Onsite 2022
Off-Road 13.62 14.21 0.61 0.59
Total 13.62 14.21 0.61 0.59
TOTAL 13.62 14.21 0.61 0.59
Onsite 2022
Off-Road 14.60 14.35 0.70 0.67
Total 14.60 14.35 0.70 0.67
TOTAL 14.60 14.35 0.70 0.67
Onsite 2022
Off-Road 14.60 14.35 0.70 0.67
Total 14.60 14.35 0.70 0.67
TOTAL 14.60 14.35 0.70 0.67
Building Construction 2023
NOx CO PM10 Total PM2.5 Total
Onsite 2023
Off-Road 13.62 14.21 0.61 0.59
Total 13.62 14.21 0.61 0.59
TOTAL 13.62 14.21 0.61 0.59
Onsite 2023
Off-Road 13.62 14.21 0.61 0.59
Total 13.62 14.21 0.61 0.59
TOTAL 13.62 14.21 0.61 0.59
Onsite 2023
Off-Road 13.62 14.21 0.61 0.59
Total 13.62 14.21 0.61 0.59
TOTAL 13.62 14.21 0.61 0.59
Paving 2023
NOx CO PM10 Total PM2.5 Total
Onsite 2023
Off-Road 8.61 11.68 0.43 0.40
Paving 0.00 0.00
Total 8.61 11.68 0.43 0.40
TOTAL 8.61 11.68 0.43 0.40
Onsite 2023
Off-Road 8.61 11.68 0.43 0.40
Paving 0.00 0.00
Total 8.61 11.68 0.43 0.40
TOTAL 8.61 11.68 0.43 0.40
Onsite 2023
Off-Road 8.61 11.68 0.43 0.40
Paving 0.00 0.00 0.00 0.00
Total 8.61 11.68 0.43 0.40
TOTAL 8.61 11.68 0.43 0.40
Architectural Coating
NOx CO PM10 Total PM2.5 Total
Onsite 2023
Archit. Coating 0.00 0.00
Off-Road 1.30 1.81 0.07 0.07
Total 1.30 1.81 0.07 0.07
TOTAL 1.30 1.81 0.07 0.07
Onsite 2023
Archit. Coating 0.00 0.00
Off-Road 1.30 1.81 0.07 0.07
Total 1.30 1.81 0.07 0.07
TOTAL 1.30 1.81 0.07 0.07
Onsite 2023
Archit. Coating 0.00 0.00 0.00 0.00
Off-Road 1.30 1.81 0.07 0.07
Total 1.30 1.81 0.07 0.07
TOTAL 1.30 1.81 0.07 0.07
NOx CO PM10 Total PM2.5 Total
Asphalt Demolition 17 14 0.84 0.78

2.00 Acre LST 114 861 7.00 4.00
Exceeds LST? no no no no
Asphalt Demolition and Debris Haul 23 15 4.82 1.49

2.00 Acre LST 114 861 7.00 4.00
Exceeds LST? no no no no
Site Preparation 16 10 1.28 0.63

1.94 Acre LST 112 843 6.81 3.94
Exceeds LST? no no no no
Rough Grading 29 20 4.71 2.64

2.85 Acre LST 130 1,036 8.98 4.85
Exceeds LST? no no no no
Rough Grading and Soil Haul 29 20 4.74 2.64

2.85 Acre LST 130 1,036 8.98 4.85
Exceeds LST? no no no no
Utilities Trenching 8 6 0.32 0.30
<1.00 Acre LST 80 571 4.00 3.00
Exceeds LST? no no no no
Utilities Trenching, Fine Grading and Soil Haul, and
Building Construction 2022 26 23 1.21 1.11

1.38 Acre LST 93 680 5.12 3.37
Exceeds LST? no no no no
Utilities Trenching and Building Construction 2022 22 20 1.02 0.97 <1.00 Acre LST 80 571 4.00 3.00
Exceeds LST? no no no no
Building Construction 2022 15 14 0.70 0.67
<1.00 Acre LST 80 571 4.00 3.00
Exceeds LST? no no no no
Building Construction 2023 14 14 0.61 0.59
<1.00 Acre LST 80 571 4.00 3.00
Exceeds LST? no no no no
Building Construction 2023 and Paving 22 26 1.05 0.99
<1.00 Acre LST 80 571 4.00 3.00
Exceeds LST? no no no no
Building Construction 2023 and Architectural
Coating 15 16 0.68 0.66
<1.00 Acre LST 80 571 4.00 3.00
Exceeds LST? no no no no
Regional Operation Emissions Worksheet: Buildout Year 20231 1 CalEEMod, Version 2020.4
Proposed Project
Summer
ROG NOx CO SO2 PM10 Total PM2.5 Total
Area 7.33 0.29 21.09 0.00 0.12 0.12
Energy 0.12 1.02 0.51 0.01 0.08 0.08
Mobile 5.37 4.02 54.38 0.11 11.95 3.22
Total 12.83 5.33 75.98 0.12 12.15 3.42
Winter
ROG NOx CO SO2 PM10 Total PM2.5 Total
Area 7.33 0.29 21.09 0.00 0.12 0.12
Energy 0.12 1.02 0.51 0.01 0.08 0.08
Mobile 5.29 4.40 53.10 0.10 11.95 3.22
Total 12.75 5.71 74.70 0.11 12.15 3.42
Max Daily
ROG NOx CO SO2 PM10 Total PM2.5 Total
Area 7.33 0.29 21.09 0.00 0.12 0.12
Energy 0.12 1.02 0.51 0.01 0.08 0.08
Mobile 5.37 4.40 54.38 0.11 11.95 3.22
Total 12.83 5.71 75.98 0.12 12.15 3.42
55 55 550 150 150 55
Exceeds Thresholds? No No No No No No
Regional Thresholds
(lb/day)
GHG Emissions Inventory
Source: CalEEMod, Version 2020.4
MTCO2e=metric tons of carbon dioxide equivalent.

Construction
MTCO2e
2022 533
2023 340
Total Construction 873
30-Year Amortization1 29
Operation MTCO2e Percent of Emissions
Area 7 0.3%
Energy 927 31%
Mobile 1,774 60%
Solid Waste 116 4%
Water 105 4%
30-Yr Amortized Construction Emissions1 29 1%
Total 2,958 100%
South Coast AQMD Working Group Threshold 3,000
Exceed Threshold? No
Notes
1 2
Total construction emissions are amortized over 30 years per South Coast AQMD Working Group methodology; SCAQMD. 2009, November 19. Greenhouse Gases (GHG) CEQA Significance Thresholds Working Group Meeting 14. http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/greenhouse-gases-(ghg)-ceqa-significance-thresholds/year-2008-2009/ghg-meeting-14/ghg-meeting-14-mainpresentation.pdf?sfvrsn=2.

Energy use is adjusted by 4 percent to reflect a slightly larger building square footage to align with the project description
CalEEMod Construction Model

Construction Phase - based on info confirmed by applicant Off-road Equipment - Off-road Equipment - Off-road Equipment - no additional equipment required for Asphalt Demolition HaulOff-road Equipment - N2O Intensity (lb/MWhr)

0.004

1.3 User Entered Comments & Non-Default Data
Project Characteristics - based on PRIME power mixLand Use - based on info from applicant Utility Company Pico Rivera Innovative Municipal EnergyCO2 Intensity (lb/MWhr) 683.98 CH4 Intensity
(lb/MWhr)

0.033
Precipitation Freq (Days) 33
Climate Zone 9 Operational Year 2023

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2
729
Regional Shopping Center 5.73 1000sqft 0.00 5,730.00 0
Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 0 Recreational Swimming Pool 17.01 1000sqft 0.00 17,010.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed-Use Project Construction Run Los Angeles-South Coast County, Annual

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblAreaCoating Area_Nonresidential_Interior 34110 28500tblAreaCoating Area_Residential_Exterior 175649 168973 tblArchitecturalCoating EF_Nonresidential_Interior 100.00 50.00 tblAreaCoating Area_Nonresidential_Exterior 11370 9500
tblArchitecturalCoating ConstArea_Residential_Interior 526,946.00 561,391.00tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00tblArchitecturalCoating ConstArea_Parking 15,360.00 11,400.00tblArchitecturalCoating ConstArea_Residential_Exterior 175,649.00 187,130.00tblArchitecturalCoating ConstArea_Nonresidential_Exterior 11,370.00 97,750.00tblArchitecturalCoating ConstArea_Nonresidential_Interior 34,110.00 293,595.00 Energy Use - Construction Off-road Equipment Mitigation - SCAQMD Rule 403 and 1186Fleet Mix - Table Name Column Name Default Value New Value
Architectural Coating - based on info from applicant, residential includes area for pool, nonresidential includes area for int/ext parking structure, parking only includes parking Vehicle Trips - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Off-road Equipment - loader HP based on CAT 966 Loader provided by applicantOff-road Equipment - based on info from applicantTrips and VMT - assumes 2 trips/water truck/day. See assumptions file for calculations on dump trucks and hauling tripsDemolition - Grading - Off-road Equipment - based on info from applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - Off-road Equipment - based on info provided by applicantOff-road Equipment - no additional equipment required for Grading Soil Haul CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblOffRoadEquipment HorsePower 78.00 50.00tblOffRoadEquipment HorsePower 80.00 134.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 158.00 270.00tblOffRoadEquipment HorsePower 158.00 249.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 97.00 276.00 tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 0.13 0.00tblLandUse LotAcreage 4.36 0.34tblLandUse LotAcreage 0.39 0.00 tblGrading MaterialExported 0.00 20,000.00
tblLandUse LandUseSquareFeet 255,000.00 260,220.00
tblConstructionPhase NumDays 3.00 6.00
tblGrading MaterialExported 0.00 7,400.00
tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 6.00 12.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 20.00 5.00tblConstructionPhase NumDays 6.00 30.00tblConstructionPhase NumDays 220.00 407.00tblConstructionPhase NumDays 20.00 37.00 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstructionPhase NumDays 10.00 19.00
tblAreaCoating Area_Residential_Interior 526946 506918
tblConstDustMitigation CleanPavedRoadPercentReduction 0 9 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblTripsAndVMT WorkerTripNumber 60.00 12.00tblTripsAndVMT WorkerTripNumber 300.00 60.00tblTripsAndVMT VendorTripNumber 0.00 6.00tblTripsAndVMT VendorTripNumber 73.00 3.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 4.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 925.00 1,058.00tblTripsAndVMT HaulingTripNumber 2,500.00 2,858.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripNumber 182.00 184.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripLength 20.00 19.00 tblSolidWaste SolidWasteGenerationRate 96.96 76.95tblSolidWaste SolidWasteGenerationRate 6.02 5.78 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment UsageHours 7.00 8.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.00 0.00 0.00 0.00 0.00
Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 29.36 0.00 18.89 33.51 0.00 12.62 0.00

0.0910 0.0221 533.3450
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2
Maximum 1.5885 2.6735 2.3152 5.9100e-003 0.1611 0.1084 0.2695 0.0508 0.1024 0.1532 0.0000 524.4936 524.4936 337.9894 337.9894 0.0539 2.6300e003 340.1221

0.0910 0.0221 533.3450
2023 1.5885 1.7623 2.0934 3.9800e-003 0.0775 0.0790 0.1565 0.0208 0.0756 0.0963 0.00002022 0.2965 2.6735 2.3152 5.9100e-003 0.1611 0.1084 0.2695 0.0508 0.1024 0.1532 0.0000 524.4936 524.4936 CH4 N2O CO2e
Year tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0910 0.0221 533.3454
Mitigated Construction
Maximum 1.5885 2.6735 2.3152 5.9100e-003 0.2538 0.1084 0.3622 0.0853 0.1024 0.1877 0.0000 524.4940 524.4940 337.9897 337.9897 0.0539 2.6300e003 340.1224

0.0910 0.0221 533.3454
2023 1.5885 1.7623 2.0934 3.9800e-003 0.0840 0.0790 0.1630 0.0224 0.0756 0.0979 0.00002022 0.2965 2.6735 2.3152 5.9100e-003 0.2538 0.1084 0.3622 0.0853 0.1024 0.1877 0.0000 524.4940 524.4940 N2O CO2e
Year tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.0 Emissions Summary

2.1 Overall Construction
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
tblWater OutdoorWaterUseRate 616,595.89 489,361.82tblWater OutdoorWaterUseRate 260,137.92 249,696.08tblWater IndoorWaterUseRate 1,006,024.88 798,432.44tblWater IndoorWaterUseRate 424,435.55 407,398.87 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Acres of Grading (Site Preparation Phase): 9
Acres of Grading (Grading Phase): 60Acres of Paving: 1.85 5 19 j
11 Architectural Coating Architectural Coating 11/7/2023 12/1/2023 5 19 k10 Paving Paving 10/11/2023 11/6/2023 5 20 h
9 Building Construction Building Construction 5/12/2022 12/1/2023 5 407 i8 Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 5 60 f
7 Fine Grading Grading 5/12/2022 6/8/2022 5 20 g6 Utility Trenching Trenching 4/14/2022 7/6/2022 5 30 d
5 Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 5 12 e4 Rough Grading Grading 3/3/2022 4/13/2022 5 5b
3 Site Preparation Site Preparation 2/23/2022 3/2/2022 5 6 c2 Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 Num Days
Week
Num Days Phase Description
1 Asphalt Demolition Demolition 1/1/2022 2/22/2022 5 37 a Phase
Number
Phase Name Phase Type Start Date End Date

3.0 Construction Detail
Construction Phase
Highest 1.3540 1.3540
7 7-1-2023 9-30-2023 0.5186 0.51866 4-1-2023 6-30-2023 0.5129 0.51295 1-1-2023 3-31-2023 0.5084 0.50844 10-1-2022 12-31-2022 0.5588 0.55883 7-1-2022 9-30-2022 0.5766 0.57662 4-1-2022 6-30-2022 1.3540 1.35401 1-1-2022 3-31-2022 1.0444 1.0444 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Fine Grading Tractors/Loaders/Backhoes 1 8.00 225 0.37

0.43 Fine Grading Rubber Tired Dozers 0 8.00 247 0.40Fine Grading Plate Compactors 5 8.00 7

0.50 Fine Grading Graders 0 8.00 187 0.41Utility Trenching Trenchers 1 8.00 50

0.43 Utility Trenching Tractors/Loaders/Backhoes 1 8.00 225 0.37Utility Trenching Plate Compactors 5 8.00 7

0.37 Utility Trenching Excavators 1 6.00 249 0.38Rough Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97

0.41 Rough Grading Soil Haul Rubber Tired Dozers 0 8.00 247 0.40Rough Grading Soil Haul Graders 0 8.00 187

0.48 Rough Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37Rough Grading Scrapers 1 8.00 367

0.38 Rough Grading Rubber Tired Dozers 1 8.00 247 0.40Rough Grading Rollers 1 8.00 134

0.38 Rough Grading Graders 1 8.00 187 0.41Rough Grading Excavators 1 8.00 270

0.48 Site Preparation Tractors/Loaders/Backhoes 1 7.00 276 0.37Site Preparation Scrapers 1 8.00 367

0.37 Site Preparation Graders 1 8.00 187 0.41Asphalt Demolition Debris Haul Tractors/Loaders/Backhoes 0 8.00 97

0.73 Asphalt Demolition Debris Haul Rubber Tired Dozers 0 8.00 247 0.40Asphalt Demolition Debris Haul Concrete/Industrial Saws 0 8.00 81

0.40 Asphalt Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37Asphalt Demolition Rubber Tired Dozers 1 8.00 247 Load Factor
Asphalt Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Residential Indoor: 561,391; Residential Outdoor: 187,130; Non-Residential Indoor: 293,595; Non-Residential Outdoor: 97,750; Striped Parking Area: 11,400 OffRoad Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied HHDT
Architectural Coating 1 12.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTPaving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Building Construction 8 60.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTFine Grading Soil Haul 0 0.00 0.00 2,858.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT
Fine Grading 6 15.00 6.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTUtility Trenching 8 20.00 4.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Rough Grading Soil
Haul
0 0.00 0.00 1,058.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT Rough Grading 7 18.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Site Preparation 3 8.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTAsphalt Demolition 14.70 6.90 19.00 LD_Mix HDT_Mix Debris Haul
0 0.00 0.00 184.00
Hauling
Vehicle Class
Asphalt Demolition 5 13.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

0.48 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor Vehicle
Class
Architectural Coating Air Compressors 1 6.00 78

0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37Paving Rollers 2 8.00 80

0.42 Paving Paving Equipment 1 8.00 132 0.36Paving Pavers 1 8.00 130

0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56Building Construction Welders 3 8.00 46

0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37Building Construction Generator Sets 1 8.00 84

0.29 Building Construction Forklifts 2 7.00 89 0.20Building Construction Cranes 1 8.00 231

0.40 Fine Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97 0.37Fine Grading Soil Haul Rubber Tired Dozers 0 8.00 247Fine Grading Soil Haul Graders 0 8.00 187 0.41 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.8740 2.8740 8.0000e005 1.6000e- 004 2.9242

6.0000e005 6.0000e- 005 2.1867
Total 8.9000e004 2.5900e-003 9.5500e-003 3.0000e-005 2.8700e-003 4.0000e- 005 2.9000e-003 7.7000e- 004 4.0000e- 005 8.0000e-004 0.0000

2.0000e005 2.0000e-005 2.6400e-003 2.0000e- 7.2000e-004 0.0000 2.1675 2.1675 005 2.6500e-003 7.0000e- 004 Worker 8.2000e- 004 6.9000e-004 8.9200e-003

0.7065 0.7065 2.0000e005 1.0000e- 004 0.7375

0.0000 0.0000 0.0000
Vendor 7.0000e005 1.9000e-003 6.3000e-004 1.0000e-005 2.3000e-004 2.0000e- 005 2.5000e-004 7.0000e- 005 2.0000e- 005 8.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

38.9937 38.9937 9.9400e003 0.0000 39.2421

9.9400e003 0.0000 39.2421
Total 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 Off-Road 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 38.9937 38.9937 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.2 Asphalt Demolition - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

3.1 Mitigation Measures Construction
Replace Ground CoverWater Exposed AreaReduce Vehicle Speed on Unpaved RoadsClean Paved Roads CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.8740 2.8740 8.0000e005 1.6000e- 004 2.9242

6.0000e005 6.0000e- 005 2.1867
Total 8.9000e004 2.5900e-003 9.5500e-003 3.0000e-005 2.6500e-003 4.0000e- 005 2.6900e-003 7.1000e- 004 4.0000e- 005 7.5000e-004 0.0000

2.0000e005 2.0000e-005 2.4300e-003 2.0000e- 6.7000e-004 0.0000 2.1675 2.1675 005 2.4500e-003 6.5000e- 004 Worker 8.2000e- 004 6.9000e-004 8.9200e-003

0.7065 0.7065 2.0000e005 1.0000e- 004 0.7375

0.0000 0.0000 0.0000
Vendor 7.0000e005 1.9000e-003 6.3000e-004 1.0000e-005 2.2000e-004 2.0000e- 005 2.4000e-004 6.0000e- 005 2.0000e- 005 8.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

38.9937 38.9937 9.9400e003 0.0000 39.2421

9.9400e003 0.0000 39.2421
Total 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 Off-Road 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 38.9937 38.9937 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

5.4107 5.4107 2.9000e004 8.6000e- 004 5.6737

0.0000 0.0000 0.0000
Total 4.1000e004 0.0156 3.5100e-003 5.0000e-005 1.5000e-003 1.1000e- 004 1.6100e-003 4.1000e- 004 1.0000e- 004 5.2000e-004 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

2.9000e004 8.6000e- 004 5.6737
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.0000e004 5.0000e-005 1.5000e-003 1.1000e- 5.2000e-004 0.0000 5.4107 5.4107 004 1.6100e-003 4.1000e- 004 Hauling 4.1000e- 004 0.0156 3.5100e-003 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Unmitigated Construction Off-Site

0.0000 0.0197 0.0000 0.0197 2.9800e- 0.0000 2.9800e-003 0.0000 0.0000 0.0000 003
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0197 0.0000 0.0197 2.9800e- 0.0000 2.9800e-003 0.0000 0.0000 0.0000 003
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.3 Asphalt Demolition Debris Haul - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

5.4107 5.4107 2.9000e004 8.6000e- 004 5.6737

0.0000 0.0000 0.0000
Total 4.1000e004 0.0156 3.5100e-003 5.0000e-005 1.4000e-003 1.1000e- 004 1.5100e-003 3.9000e- 004 1.0000e- 004 4.9000e-004 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

2.9000e004 8.6000e- 004 5.6737
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.0000e004 5.0000e-005 1.4000e-003 1.1000e- 4.9000e-004 0.0000 5.4107 5.4107 004 1.5100e-003 3.9000e- 004 Hauling 4.1000e- 004 0.0156 3.5100e-003 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Mitigated Construction Off-Site

0.0000 8.4100e-003 0.0000 8.4100e-003 1.2700e- 0.0000 1.2700e-003 0.0000 0.0000 0.0000 003
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

8.4100e-003 0.0000 8.4100e-003 1.2700e- 0.0000 1.2700e-003 0.0000 0.0000 0.0000 003
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.3309 0.3309 1.0000e005 3.0000e- 005 0.3378

1.0000e005 1.0000e- 005 0.2182
Total 9.0000e005 3.8000e-004 9.9000e-004 0.0000 3.0000e-004 0.0000 3.0000e-004 8.0000e- 005 0.0000 8.0000e-005 0.0000

0.0000 2.6000e-004 0.0000 2.6000e-004 7.0000e- 0.0000 7.0000e-005 0.0000 0.2163 0.2163 005
Worker 8.0000e005 7.0000e-005 8.9000e-004

0.1146 0.1146 0.0000 2.0000e005 0.1196

0.0000 0.0000 0.0000
Vendor 1.0000e005 3.1000e-004 1.0000e-004 0.0000 4.0000e-005 0.0000 4.0000e-005 1.0000e- 005 0.0000 1.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.5100e003 0.0000 7.8222
Unmitigated Construction Off-Site

1.6600e003 9.0000e-005 4.7700e-003 1.8000e- 2.1800e-003 0.0000 7.7594 7.7594 003 6.5700e-003 5.2000e- 004 Total 4.4600e- 003 0.0494 0.0304

7.7594 7.7594 2.5100e003 0.0000 7.8222

0.0000 0.0000 0.0000
Off-Road 4.4600e003 0.0494 0.0304 9.0000e-005 1.8000e- 003 1.8000e-003 1.6600e- 003 1.6600e-003 0.0000

4.7700e-003 0.0000 4.7700e-003 5.2000e- 0.0000 5.2000e-004 0.0000 0.0000 0.0000 004
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.4 Site Preparation - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.3309 0.3309 1.0000e005 3.0000e- 005 0.3378

1.0000e005 1.0000e- 005 0.2182
Total 9.0000e005 3.8000e-004 9.9000e-004 0.0000 2.8000e-004 0.0000 2.8000e-004 7.0000e- 005 0.0000 8.0000e-005 0.0000

0.0000 2.4000e-004 0.0000 2.4000e-004 6.0000e- 0.0000 7.0000e-005 0.0000 0.2163 0.2163 005
Worker 8.0000e005 7.0000e-005 8.9000e-004

0.1146 0.1146 0.0000 2.0000e005 0.1196

0.0000 0.0000 0.0000
Vendor 1.0000e005 3.1000e-004 1.0000e-004 0.0000 4.0000e-005 0.0000 4.0000e-005 1.0000e- 005 0.0000 1.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.5100e003 0.0000 7.8222
Mitigated Construction Off-Site

1.6600e003 9.0000e-005 2.0400e-003 1.8000e- 1.8800e-003 0.0000 7.7594 7.7594 003 3.8400e-003 2.2000e- 004 Total 4.4600e- 003 0.0494 0.0304

7.7594 7.7594 2.5100e003 0.0000 7.8222

0.0000 0.0000 0.0000
Off-Road 4.4600e003 0.0494 0.0304 9.0000e-005 1.8000e- 003 1.8000e-003 1.6600e- 003 1.6600e-003 0.0000

2.0400e-003 0.0000 2.0400e-003 2.2000e- 0.0000 2.2000e-004 0.0000 0.0000 0.0000 004
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

3.0062 3.0062 9.0000e005 1.5000e- 004 3.0529

7.0000e005 7.0000e- 005 2.4549
Total 9.8000e004 2.3100e-003 0.0105 4.0000e-005 3.1500e-003 3.0000e- 005 3.1800e-003 8.4000e- 004 3.0000e- 005 8.7000e-004 0.0000

2.0000e005 3.0000e-005 2.9600e-003 2.0000e- 8.0000e-004 0.0000 2.4334 2.4334 005 2.9800e-003 7.9000e- 004 Worker 9.2000e- 004 7.7000e-004 0.0100

0.5729 0.5729 2.0000e005 8.0000e- 005 0.5980

0.0000 0.0000 0.0000
Vendor 6.0000e005 1.5400e-003 5.1000e-004 1.0000e-005 1.9000e-004 1.0000e- 005 2.0000e-004 5.0000e- 005 1.0000e- 005 7.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0209 0.0000 65.0167
Unmitigated Construction Off-Site
Total 0.0411 0.4402 0.3020 7.3000e-004 0.1222 0.0184 0.1405 0.0531 0.0169 0.0700 0.0000 64.4952 64.4952

64.4952 64.4952 0.0209 0.0000 65.0167

0.0000 0.0000 0.0000
Off-Road 0.0411 0.4402 0.3020 7.3000e-004 0.0184 0.0184 0.0169 0.0169 0.0000 Fugitive Dust 0.1222 0.0000 0.1222 0.0531 0.0000 0.0531 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.5 Rough Grading - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

3.0062 3.0062 9.0000e005 1.5000e- 004 3.0529

7.0000e005 7.0000e- 005 2.4549
Total 9.8000e004 2.3100e-003 0.0105 4.0000e-005 2.9100e-003 3.0000e- 005 2.9400e-003 7.8000e- 004 3.0000e- 005 8.2000e-004 0.0000

2.0000e005 3.0000e-005 2.7300e-003 2.0000e- 7.5000e-004 0.0000 2.4334 2.4334 005 2.7500e-003 7.3000e- 004 Worker 9.2000e- 004 7.7000e-004 0.0100

0.5729 0.5729 2.0000e005 8.0000e- 005 0.5980

0.0000 0.0000 0.0000
Vendor 6.0000e005 1.5400e-003 5.1000e-004 1.0000e-005 1.8000e-004 1.0000e- 005 1.9000e-004 5.0000e- 005 1.0000e- 005 7.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0209 0.0000 65.0166
Mitigated Construction Off-Site
Total 0.0411 0.4402 0.3020 7.3000e-004 0.0522 0.0184 0.0706 0.0227 0.0169 0.0396 0.0000 64.4951 64.4951

64.4951 64.4951 0.0209 0.0000 65.0166

0.0000 0.0000 0.0000
Off-Road 0.0411 0.4402 0.3020 7.3000e-004 0.0184 0.0184 0.0169 0.0169 0.0000 Fugitive Dust 0.0522 0.0000 0.0522 0.0227 0.0000 0.0227 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

31.1114 31.1114 1.6500e003 4.9400e- 003 32.6236

0.0000 0.0000 0.0000
Total 2.3400e003 0.0894 0.0202 3.1000e-004 8.6500e-003 6.3000e- 004 9.2700e-003 2.3800e- 003 6.0000e- 004 2.9800e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

1.6500e003 4.9400e- 003 32.6236
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

6.0000e004 3.1000e-004 8.6500e-003 6.3000e- 2.9800e-003 0.0000 31.1114 31.1114 004 9.2700e-003 2.3800e- 003 Hauling 2.3400e- 003 0.0894 0.0202 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Unmitigated Construction Off-Site

0.0000 4.2000e-004 0.0000 4.2000e-004 6.0000e- 0.0000 6.0000e-005 0.0000 0.0000 0.0000 005
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

4.2000e-004 0.0000 4.2000e-004 6.0000e- 0.0000 6.0000e-005 0.0000 0.0000 0.0000 005
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.6 Rough Grading Soil Haul - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

31.1114 31.1114 1.6500e003 4.9400e- 003 32.6236

0.0000 0.0000 0.0000
Total 2.3400e003 0.0894 0.0202 3.1000e-004 8.0600e-003 6.3000e- 004 8.6900e-003 2.2300e- 003 6.0000e- 004 2.8300e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

1.6500e003 4.9400e- 003 32.6236
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

6.0000e004 3.1000e-004 8.0600e-003 6.3000e- 2.8300e-003 0.0000 31.1114 31.1114 004 8.6900e-003 2.2300e- 003 Hauling 2.3400e- 003 0.0894 0.0202 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Mitigated Construction Off-Site

0.0000 1.8000e-004 0.0000 1.8000e-004 3.0000e- 0.0000 3.0000e-005 0.0000 0.0000 0.0000 005
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.8000e-004 0.0000 1.8000e-004 3.0000e- 0.0000 3.0000e-005 0.0000 0.0000 0.0000 005
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

7.6990 7.6990 2.4000e004 4.8000e- 004 7.8473

1.6000e004 1.5000e- 004 5.4554
Total 2.2900e003 7.8800e-003 0.0243 8.0000e-005 7.3300e-003 1.0000e- 004 7.4300e-003 1.9700e- 003 9.0000e- 005 2.0600e-003 0.0000

4.0000e005 6.0000e-005 6.5700e-003 4.0000e- 1.7900e-003 0.0000 5.4075 5.4075 005 6.6200e-003 1.7500e- 003 Worker 2.0600e- 003 1.7100e-003 0.0222

2.2915 2.2915 8.0000e005 3.3000e- 004 2.3919

0.0000 0.0000 0.0000
Vendor 2.3000e004 6.1700e-003 2.0500e-003 2.0000e-005 7.6000e-004 6.0000e- 005 8.1000e-004 2.2000e- 004 5.0000e- 005 2.7000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

45.2951 45.2951 0.0138 0.0000 45.6388

0.0138 0.0000 45.6388
Total 0.0286 0.2271 0.1796 5.3000e-004 9.5100e003 9.5100e-003 8.8500e- 003 8.8500e-003 0.0000

8.8500e003 5.3000e-004 9.5100e- 8.8500e-003 0.0000 45.2951 45.2951 003 Off-Road 0.0286 0.2271 0.1796 9.5100e-003 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.7 Utility Trenching - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

7.6990 7.6990 2.4000e004 4.8000e- 004 7.8473

1.6000e004 1.5000e- 004 5.4554
Total 2.2900e003 7.8800e-003 0.0243 8.0000e-005 6.7700e-003 1.0000e- 004 6.8600e-003 1.8300e- 003 9.0000e- 005 1.9200e-003 0.0000

4.0000e005 6.0000e-005 6.0600e-003 4.0000e- 1.6600e-003 0.0000 5.4075 5.4075 005 6.1000e-003 1.6200e- 003 Worker 2.0600e- 003 1.7100e-003 0.0222

2.2915 2.2915 8.0000e005 3.3000e- 004 2.3919

0.0000 0.0000 0.0000
Vendor 2.3000e004 6.1700e-003 2.0500e-003 2.0000e-005 7.1000e-004 6.0000e- 005 7.6000e-004 2.1000e- 004 5.0000e- 005 2.6000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

45.2950 45.2950 0.0138 0.0000 45.6387

0.0138 0.0000 45.6387
Total 0.0286 0.2271 0.1796 5.3000e-004 9.5100e003 9.5100e-003 8.8500e- 003 8.8500e-003 0.0000

8.8500e003 5.3000e-004 9.5100e- 8.8500e-003 0.0000 45.2950 45.2950 003 Off-Road 0.0286 0.2271 0.1796 9.5100e-003 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.4976 2.4976 8.0000e005 2.1000e- 004 2.5598

4.0000e005 4.0000e- 005 1.3638
Total 6.3000e004 3.5200e-003 6.5800e-003 2.0000e-005 2.0200e-003 4.0000e- 005 2.0600e-003 5.5000e- 004 4.0000e- 005 5.9000e-004 0.0000

1.0000e005 1.0000e-005 1.6400e-003 1.0000e- 4.5000e-004 0.0000 1.3519 1.3519 005 1.6500e-003 4.4000e- 004 Worker 5.1000e- 004 4.3000e-004 5.5600e-003

1.1458 1.1458 4.0000e005 1.7000e- 004 1.1960

0.0000 0.0000 0.0000
Vendor 1.2000e004 3.0900e-003 1.0200e-003 1.0000e-005 3.8000e-004 3.0000e- 005 4.1000e-004 1.1000e- 004 3.0000e- 005 1.4000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.1700e003 0.0000 7.6847
Unmitigated Construction Off-Site

1.3300e003 9.0000e-005 0.0000 1.4100e- 1.3300e-003 0.0000 7.6305 7.6305 003 Total 4.5000e- 1.4100e-003 0.0000 003 0.0395 0.0263

7.6305 7.6305 2.1700e003 0.0000 7.6847

0.0000 0.0000 0.0000
Off-Road 4.5000e003 0.0395 0.0263 9.0000e-005 1.4100e- 003 1.4100e-003 1.3300e- 003 1.3300e-003 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.8 Fine Grading - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.4976 2.4976 8.0000e005 2.1000e- 004 2.5598

4.0000e005 4.0000e- 005 1.3638
Total 6.3000e004 3.5200e-003 6.5800e-003 2.0000e-005 1.8700e-003 4.0000e- 005 1.9100e-003 5.1000e- 004 4.0000e- 005 5.4000e-004 0.0000

1.0000e005 1.0000e-005 1.5200e-003 1.0000e- 4.1000e-004 0.0000 1.3519 1.3519 005 1.5300e-003 4.1000e- 004 Worker 5.1000e- 004 4.3000e-004 5.5600e-003

1.1458 1.1458 4.0000e005 1.7000e- 004 1.1960

0.0000 0.0000 0.0000
Vendor 1.2000e004 3.0900e-003 1.0200e-003 1.0000e-005 3.5000e-004 3.0000e- 005 3.8000e-004 1.0000e- 004 3.0000e- 005 1.3000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.1700e003 0.0000 7.6847
Mitigated Construction Off-Site

1.3300e003 9.0000e-005 0.0000 1.4100e- 1.3300e-003 0.0000 7.6305 7.6305 003 Total 4.5000e- 1.4100e-003 0.0000 003 0.0395 0.0263

7.6305 7.6305 2.1700e003 0.0000 7.6847

0.0000 0.0000 0.0000
Off-Road 4.5000e003 0.0395 0.0263 9.0000e-005 1.4100e- 003 1.4100e-003 1.3300e- 003 1.3300e-003 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

84.0418 84.0418 4.4500e003 0.0133 88.1270

0.0000 0.0000 0.0000
Total 6.3300e003 0.2415 0.0545 8.5000e-004 0.0234 1.7000e- 003 0.0251 6.4200e- 003 1.6200e- 003 8.0400e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

4.4500e003 0.0133 88.1270
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.6200e003 8.5000e-004 0.0234 1.7000e- 8.0400e-003 0.0000 84.0418 84.0418 003 0.0251 6.4200e- 003 Hauling 6.3300e- 003 0.2415 0.0545 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Unmitigated Construction Off-Site

0.0000 1.1300e-003 0.0000 1.1300e-003 1.7000e- 0.0000 1.7000e-004 0.0000 0.0000 0.0000 004
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.1300e-003 0.0000 1.1300e-003 1.7000e- 0.0000 1.7000e-004 0.0000 0.0000 0.0000 004
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.9 Fine Grading Soil Haul - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

84.0418 84.0418 4.4500e003 0.0133 88.1270

0.0000 0.0000 0.0000
Total 6.3300e003 0.2415 0.0545 8.5000e-004 0.0218 1.7000e- 003 0.0235 6.0300e- 003 1.6200e- 003 7.6500e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

4.4500e003 0.0133 88.1270
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.6200e003 8.5000e-004 0.0218 1.7000e- 7.6500e-003 0.0000 84.0418 84.0418 003 0.0235 6.0300e- 003 Hauling 6.3300e- 003 0.2415 0.0545 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Mitigated Construction Off-Site

0.0000 4.8000e-004 0.0000 4.8000e-004 7.0000e- 0.0000 7.0000e-005 0.0000 0.0000 0.0000 005
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

4.8000e-004 0.0000 4.8000e-004 7.0000e- 0.0000 7.0000e-005 0.0000 0.0000 0.0000 005
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

49.9357 49.9357 1.4600e003 1.9200e- 003 50.5454

1.3000e003 1.2300e- 003 45.5523
Total 0.0177 0.0272 0.1900 5.4000e-004 0.0565 4.8000e004 0.0570 0.0150 4.4000e- 004 0.0155 0.0000

3.3000e004 4.9000e-004 0.0549 3.6000e- 0.0149 0.0000 45.1522 45.1522 004 Worker 0.0172 0.0143 0.1857 0.0553 0.0146

4.7835 4.7835 1.6000e004 6.9000e- 004 4.9931

0.0000 0.0000 0.0000
Vendor 4.9000e004 0.0129 4.2700e-003 5.0000e-005 1.5800e-003 1.2000e- 004 1.7000e-003 4.6000e- 004 1.1000e- 004 5.7000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
173.4129 173.4129 0.0335 0.0000 174.2493

0.0335 0.0000 174.2493
Total 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 Off-Road 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 173.4129 173.4129 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

49.9357 49.9357 1.4600e003 1.9200e- 003 50.5454

1.3000e003 1.2300e- 003 45.5523
Total 0.0177 0.0272 0.1900 5.4000e-004 0.0521 4.8000e004 0.0526 0.0140 4.4000e- 004 0.0144 0.0000

3.3000e004 4.9000e-004 0.0506 3.6000e- 0.0139 0.0000 45.1522 45.1522 004 Worker 0.0172 0.0143 0.1857 0.0510 0.0135

4.7835 4.7835 1.6000e004 6.9000e- 004 4.9931

0.0000 0.0000 0.0000
Vendor 4.9000e004 0.0129 4.2700e-003 5.0000e-005 1.4800e-003 1.2000e- 004 1.6000e-003 4.3000e- 004 1.1000e- 004 5.4000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
173.4127 173.4127 0.0335 0.0000 174.2491

0.0335 0.0000 174.2491
Total 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 Off-Road 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 173.4127 173.4127 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

69.3472 69.3472 1.8900e003 2.5700e- 003 70.1623

1.6700e003 1.6300e- 003 63.3305
Total 0.0233 0.0327 0.2507 7.5000e-004 0.0812 5.5000e004 0.0817 0.0216 5.2000e- 004 0.0221 0.0000

4.5000e004 6.8000e-004 0.0789 4.8000e- 0.0214 0.0000 62.8016 62.8016 004 Worker 0.0228 0.0181 0.2453 0.0794 0.0210

6.5456 6.5456 2.2000e004 9.4000e- 004 6.8318

0.0000 0.0000 0.0000
Vendor 4.1000e004 0.0145 5.4300e-003 7.0000e-005 2.2700e-003 7.0000e- 005 2.3400e-003 6.5000e- 004 7.0000e- 005 7.2000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
249.2425 249.2425 0.0471 0.0000 250.4209

0.0471 0.0000 250.4209
Total 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 Off-Road 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 249.2425 249.2425 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

69.3472 69.3472 1.8900e003 2.5700e- 003 70.1623

1.6700e003 1.6300e- 003 63.3305
Total 0.0233 0.0327 0.2507 7.5000e-004 0.0749 5.5000e004 0.0754 0.0201 5.2000e- 004 0.0206 0.0000

4.5000e004 6.8000e-004 0.0727 4.8000e- 0.0199 0.0000 62.8016 62.8016 004 Worker 0.0228 0.0181 0.2453 0.0732 0.0194

6.5456 6.5456 2.2000e004 9.4000e- 004 6.8318

0.0000 0.0000 0.0000
Vendor 4.1000e004 0.0145 5.4300e-003 7.0000e-005 2.1200e-003 7.0000e- 005 2.1900e-003 6.2000e- 004 7.0000e- 005 6.9000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
249.2422 249.2422 0.0471 0.0000 250.4206

0.0471 0.0000 250.4206
Total 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 Off-Road 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 249.2422 249.2422 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.2430 1.2430 3.0000e005 3.0000e- 005 1.2534

3.0000e005 3.0000e- 005 1.2534
Total 4.5000e004 3.6000e-004 4.8600e-003 1.0000e-005 1.5600e-003 1.0000e- 005 1.5700e-003 4.1000e- 004 1.0000e- 005 4.2000e-004 0.0000

1.0000e005 1.0000e-005 1.5600e-003 1.0000e- 4.2000e-004 0.0000 1.2430 1.2430 005 1.5700e-003 4.1000e- 004 Worker 4.5000e- 004 3.6000e-004 4.8600e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

4.6700e003 0.0000 14.8539
Unmitigated Construction Off-Site

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7372 14.7372 003 Total 9.7100e- 4.1200e-003 003 0.0818 0.1110

0.0000 0.0000 0.0000 0.0000 0.0000

4.6700e003 0.0000 14.8539
Paving 1.3500e003 0.0000 0.0000 0.0000 0.0000 0.0000

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7372 14.7372 003 Off-Road 8.3600e- 4.1200e-003 003 0.0818 0.1110 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.11 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.2430 1.2430 3.0000e005 3.0000e- 005 1.2534

3.0000e005 3.0000e- 005 1.2534
Total 4.5000e004 3.6000e-004 4.8600e-003 1.0000e-005 1.4400e-003 1.0000e- 005 1.4500e-003 3.8000e- 004 1.0000e- 005 3.9000e-004 0.0000

1.0000e005 1.0000e-005 1.4400e-003 1.0000e- 3.9000e-004 0.0000 1.2430 1.2430 005 1.4500e-003 3.8000e- 004 Worker 4.5000e- 004 3.6000e-004 4.8600e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

4.6700e003 0.0000 14.8539
Mitigated Construction Off-Site

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7371 14.7371 003 Total 9.7100e- 4.1200e-003 003 0.0818 0.1110

0.0000 0.0000 0.0000 0.0000 0.0000

4.6700e003 0.0000 14.8539
Paving 1.3500e003 0.0000 0.0000 0.0000 0.0000 0.0000

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7371 14.7371 003 Off-Road 8.3600e- 4.1200e-003 003 0.0818 0.1110 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.9944 0.9944 3.0000e005 3.0000e- 005 1.0027

3.0000e005 3.0000e- 005 1.0027
Total 3.6000e004 2.9000e-004 3.8800e-003 1.0000e-005 1.2500e-003 1.0000e- 005 1.2600e-003 3.3000e- 004 1.0000e- 005 3.4000e-004 0.0000

1.0000e005 1.0000e-005 1.2500e-003 1.0000e- 3.4000e-004 0.0000 0.9944 0.9944 005 1.2600e-003 3.3000e- 004 Worker 3.6000e- 004 2.9000e-004 3.8800e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5000e004 0.0000 2.4292
Unmitigated Construction Off-Site

6.7000e004 3.0000e-005 6.7000e- 6.7000e-004 0.0000 2.4256 2.4256 004 Total 1.3491 0.0124 0.0172 6.7000e-004

2.4256 2.4256 1.5000e004 0.0000 2.4292

0.0000 0.0000 0.0000
Off-Road 1.8200e003 0.0124 0.0172 3.0000e-005 6.7000e- 004 6.7000e-004 6.7000e- 004 6.7000e-004 0.0000 Archit. Coating 1.3472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.12 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:08 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.9944 0.9944 3.0000e005 3.0000e- 005 1.0027

3.0000e005 3.0000e- 005 1.0027
Total 3.6000e004 2.9000e-004 3.8800e-003 1.0000e-005 1.1500e-003 1.0000e- 005 1.1600e-003 3.1000e- 004 1.0000e- 005 3.1000e-004 0.0000

1.0000e005 1.0000e-005 1.1500e-003 1.0000e- 3.1000e-004 0.0000 0.9944 0.9944 005 1.1600e-003 3.1000e- 004 Worker 3.6000e- 004 2.9000e-004 3.8800e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5000e004 0.0000 2.4292
Mitigated Construction Off-Site

6.7000e004 3.0000e-005 6.7000e- 6.7000e-004 0.0000 2.4256 2.4256 004 Total 1.3491 0.0124 0.0172 6.7000e-004

2.4256 2.4256 1.5000e004 0.0000 2.4292

0.0000 0.0000 0.0000
Off-Road 1.8200e003 0.0124 0.0172 3.0000e-005 6.7000e- 004 6.7000e-004 6.7000e- 004 6.7000e-004 0.0000 Archit. Coating 1.3472 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
Construction Phase - based on info confirmed by applicant Off-road Equipment - Off-road Equipment - Off-road Equipment - no additional equipment required for Asphalt Demolition Haul N2O Intensity (lb/MWhr)

0.004

1.3 User Entered Comments & Non-Default DataProject Characteristics - based on PRIME power mixLand Use - based on info from applicant Utility Company Pico Rivera Innovative Municipal EnergyCO2 Intensity (lb/MWhr) 683.98 CH4 Intensity
(lb/MWhr)

0.033
Precipitation Freq (Days) 33
Climate Zone 9 Operational Year 2023

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2
729
Regional Shopping Center 5.73 1000sqft 0.00 5,730.00 0
Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 0 Recreational Swimming Pool 17.01 1000sqft 0.00 17,010.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed-Use Project Construction Run Los Angeles-South Coast County, Summer

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblArchitecturalCoating EF_Nonresidential_Interior 100.00 50.00 tblAreaCoating Area_Nonresidential_Exterior 11370 9500
tblArchitecturalCoating ConstArea_Residential_Interior 526,946.00 561,391.00tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00tblArchitecturalCoating ConstArea_Parking 15,360.00 11,400.00tblArchitecturalCoating ConstArea_Residential_Exterior 175,649.00 187,130.00tblArchitecturalCoating ConstArea_Nonresidential_Exterior 11,370.00 97,750.00tblArchitecturalCoating ConstArea_Nonresidential_Interior 34,110.00 293,595.00 Energy Use - Construction Off-road Equipment Mitigation - SCAQMD Rule 403 and 1186Fleet Mix - Table Name Column Name Default Value New Value
Architectural Coating - based on info from applicant, residential includes area for pool, nonresidential includes area for int/ext parking structure, parking only includes ki Vehicle Trips -
Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Off-road Equipment - loader HP based on CAT 966 Loader provided by applicantOff-road Equipment - based on info from applicantTrips and VMT - assumes 2 trips/water truck/day. See assumptions file for calculations on dump trucks and hauling tripsDemolition - Grading - Off-road Equipment - based on info from applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - Off-road Equipment - based on info provided by applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 158.00 270.00tblOffRoadEquipment HorsePower 158.00 249.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 97.00 276.00 tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 0.13 0.00tblLandUse LotAcreage 4.36 0.34tblLandUse LotAcreage 0.39 0.00 tblGrading MaterialExported 0.00 20,000.00
tblLandUse LandUseSquareFeet 255,000.00 260,220.00
tblConstructionPhase NumDays 3.00 6.00
tblGrading MaterialExported 0.00 7,400.00
tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 6.00 12.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 20.00 5.00tblConstructionPhase NumDays 6.00 30.00tblConstructionPhase NumDays 220.00 407.00tblConstructionPhase NumDays 20.00 37.00 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstructionPhase NumDays 10.00 19.00
tblAreaCoating Area_Residential_Interior 526946 506918
tblConstDustMitigation CleanPavedRoadPercentReduction 0 9 tblAreaCoating Area_Nonresidential_Interior 34110 28500tblAreaCoating Area_Residential_Exterior 175649 168973 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 4.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 925.00 1,058.00tblTripsAndVMT HaulingTripNumber 2,500.00 2,858.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripNumber 182.00 184.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripLength 20.00 19.00 tblSolidWaste SolidWasteGenerationRate 96.96 76.95tblSolidWaste SolidWasteGenerationRate 6.02 5.78 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment UsageHours 7.00 8.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 78.00 50.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 80.00 134.00tblOffRoadEquipment HorsePower 97.00 225.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.8426 1.5328 15,812.527
0 1.2757 3.1774 0.0000 15,312.910
8 15,312.910
8 Maximum 143.9538 49.9364 32.3389 0.1489 5.0749 1.3427 6.4070 1.9480 4,809.6571 4,809.6571 0.9959 0.0260 4,842.2862

1.8426 1.5328 15,812.527
0 2023 143.9538 22.5162 28.6536 0.0509 0.7907 1.0531 1.8438 0.2115 0.9935 1.2049 0.0000

1.2757 3.1774 0.0000 15,312.910
8 15,312.910
8 2022 4.2542 49.9364 32.3389 0.1489 5.0749 1.3427 6.4070 1.9480 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.8426 1.5328 15,812.527
0 Mitigated Construction

1.2757 5.2382 0.0000 15,312.910
8 15,312.910
8 Maximum 143.9538 49.9364 32.3389 0.1489 9.8930 1.3427 11.2251 4.0089 4,809.6571 4,809.6571 0.9959 0.0260 4,842.2862

1.8426 1.5328 15,812.527
0 2023 143.9538 22.5162 28.6536 0.0509 0.8575 1.0531 1.9106 0.2279 0.9935 1.2213 0.0000

1.2757 5.2382 0.0000 15,312.910
8 15,312.910
8 2022 4.2542 49.9364 32.3389 0.1489 9.8930 1.3427 11.2251 4.0089 N2O CO2e
Year lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)Unmitigated Construction ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
tblWater OutdoorWaterUseRate 616,595.89 489,361.82tblWater OutdoorWaterUseRate 260,137.92 249,696.08tblWater IndoorWaterUseRate 1,006,024.88 798,432.44tblWater IndoorWaterUseRate 424,435.55 407,398.87 tblTripsAndVMT WorkerTripNumber 60.00 12.00tblTripsAndVMT WorkerTripNumber 300.00 60.00tblTripsAndVMT VendorTripNumber 0.00 6.00tblTripsAndVMT VendorTripNumber 73.00 3.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Acres of Grading (Site Preparation Phase): 9
Acres of Grading (Grading Phase): 60Acres of Paving: 1.85 Residential Indoor: 561,391; Residential Outdoor: 187,130; Non-Residential Indoor: 293,595; Non-Residential Outdoor: 97,750; Striped Parking Area:
5 19 j
11 Architectural Coating Architectural Coating 11/7/2023 12/1/2023 5 19 k10 Paving Paving 10/11/2023 11/6/2023 5 20 h
9 Building Construction Building Construction 5/12/2022 12/1/2023 5 407 i8 Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 5 60 f
7 Fine Grading Grading 5/12/2022 6/8/2022 5 20 g6 Utility Trenching Trenching 4/14/2022 7/6/2022 5 30 d
5 Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 5 12 e4 Rough Grading Grading 3/3/2022 4/13/2022 5 5b
3 Site Preparation Site Preparation 2/23/2022 3/2/2022 5 6 c2 Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 Num Days
Week
Num Days Phase Description
1 Asphalt Demolition Demolition 1/1/2022 2/22/2022 5 37 a Phase
Number
Phase Name Phase Type Start Date End Date

3.0 Construction DetailConstruction Phase

0.00 0.00 0.00 0.00 0.00
Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 45.44 0.00 37.19 49.03 0.00 32.16 0.00 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Fine Grading Tractors/Loaders/Backhoes 1 8.00 225 0.37

0.43 Fine Grading Rubber Tired Dozers 0 8.00 247 0.40Fine Grading Plate Compactors 5 8.00 7

0.50 Fine Grading Graders 0 8.00 187 0.41Utility Trenching Trenchers 1 8.00 50

0.43 Utility Trenching Tractors/Loaders/Backhoes 1 8.00 225 0.37Utility Trenching Plate Compactors 5 8.00 7

0.37 Utility Trenching Excavators 1 6.00 249 0.38Rough Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97

0.41 Rough Grading Soil Haul Rubber Tired Dozers 0 8.00 247 0.40Rough Grading Soil Haul Graders 0 8.00 187

0.48 Rough Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37Rough Grading Scrapers 1 8.00 367

0.38 Rough Grading Rubber Tired Dozers 1 8.00 247 0.40Rough Grading Rollers 1 8.00 134

0.38 Rough Grading Graders 1 8.00 187 0.41Rough Grading Excavators 1 8.00 270

0.48 Site Preparation Tractors/Loaders/Backhoes 1 7.00 276 0.37Site Preparation Scrapers 1 8.00 367

0.37 Site Preparation Graders 1 8.00 187 0.41Asphalt Demolition Debris Haul Tractors/Loaders/Backhoes 0 8.00 97

0.73 Asphalt Demolition Debris Haul Rubber Tired Dozers 0 8.00 247 0.40Asphalt Demolition Debris Haul Concrete/Industrial Saws 0 8.00 81

0.40 Asphalt Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37Asphalt Demolition Rubber Tired Dozers 1 8.00 247 Load Factor
Asphalt Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power OffRoad Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied HHDT
Architectural Coating 1 12.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTPaving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Building Construction 8 60.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTFine Grading Soil Haul 0 0.00 0.00 2,858.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT
Fine Grading 6 15.00 6.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTUtility Trenching 8 20.00 4.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Rough Grading Soil
Haul
0 0.00 0.00 1,058.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT Rough Grading 7 18.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Site Preparation 3 8.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTAsphalt Demolition 14.70 6.90 19.00 LD_Mix HDT_Mix Debris Haul
0 0.00 0.00 184.00
Hauling
Vehicle Class
Asphalt Demolition 5 13.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

0.48 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor Vehicle
Class
Architectural Coating Air Compressors 1 6.00 78

0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37Paving Rollers 2 8.00 80

0.42 Paving Paving Equipment 1 8.00 132 0.36Paving Pavers 1 8.00 130

0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56Building Construction Welders 3 8.00 46

0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37Building Construction Generator Sets 1 8.00 84

0.29 Building Construction Forklifts 2 7.00 89 0.20Building Construction Cranes 1 8.00 231

0.40 Fine Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97 0.37Fine Grading Soil Haul Rubber Tired Dozers 0 8.00 247Fine Grading Soil Haul Graders 0 8.00 187 0.41 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 176.4398 176.4398 5.0700e003 9.3200e- 003 179.3434

3.6600e003 3.2500e- 003 135.4083
Total 0.0489 0.1308 0.5453 1.7200e003 0.1581 1.8600e- 003 0.1600 0.0422 1.7500e- 003 0.0440

8.6000e004 1.3300e- 0.0394 134.3475 134.3475 003 0.1453 9.3000e- 004 Worker 0.0450 0.0328 0.5117 0.1462 0.0385

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0128 9.3000e- 004 0.0137 3.6900e-003 8.9000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.2 Asphalt Demolition - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

3.1 Mitigation Measures ConstructionReplace Ground CoverWater Exposed AreaReduce Vehicle Speed on Unpaved RoadsClean Paved Roads CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 176.4398 176.4398 5.0700e003 9.3200e- 003 179.3434

3.6600e003 3.2500e- 003 135.4083
Total 0.0489 0.1308 0.5453 1.7200e003 0.1459 1.8600e- 003 0.1478 0.0392 1.7500e- 003 0.0410

8.6000e004 1.3300e- 0.0366 134.3475 134.3475 003 0.1339 9.3000e- 004 Worker 0.0450 0.0328 0.5117 0.1349 0.0358

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0120 9.3000e- 004 0.0129 3.4900e-003 8.9000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,385.3896 2,385.3896 0.1266 0.3785 2,501.3374

0.0000 0.0000 0.0000
Total 0.1649 5.9064 1.3944 0.0218 0.6120 0.0437 0.6556 0.1678 0.0418 0.2095 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1266 0.3785 2,501.3374
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1649 5.9064 1.3944 0.0218 0.6120 0.0437 0.6556 0.1678 0.0418 0.2095 2,385.3896 2,385.3896 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.3 Asphalt Demolition Debris Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,385.3896 2,385.3896 0.1266 0.3785 2,501.3374

0.0000 0.0000 0.0000
Total 0.1649 5.9064 1.3944 0.0218 0.5704 0.0437 0.6140 0.1576 0.0418 0.1993 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1266 0.3785 2,501.3374
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1649 5.9064 1.3944 0.0218 0.5704 0.0437 0.6140 0.1576 0.0418 0.1993 2,385.3896 2,385.3896 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 124.7677 124.7677 3.6600e003 8.0700e- 003 127.2632

2.2500e003 2.0000e- 003 83.3282
Total 0.0316 0.1182 0.3485 1.2100e003 0.1022 1.5000e- 003 0.1037 0.0274 1.4200e- 003 0.0288

5.3000e004 8.2000e- 0.0242 82.6754 82.6754 004 0.0894 5.7000e- 004 Worker 0.0277 0.0202 0.3149 0.0900 0.0237

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0128 9.3000e- 004 0.0137 3.6900e-003 8.9000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Unmitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 1.5908 0.5998 2.1905 0.1718 0.5518 0.7236 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 Fugitive Dust 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.4 Site Preparation - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 124.7677 124.7677 3.6600e003 8.0700e- 003 127.2632

2.2500e003 2.0000e- 003 83.3282
Total 0.0316 0.1182 0.3485 1.2100e003 0.0944 1.5000e- 003 0.0959 0.0255 1.4200e- 003 0.0269

5.3000e004 8.2000e- 0.0225 82.6754 82.6754 004 0.0824 5.7000e- 004 Worker 0.0277 0.0202 0.3149 0.0830 0.0220

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0120 9.3000e- 004 0.0129 3.4900e-003 8.9000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Mitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 0.6801 0.5998 1.2798 0.0734 0.5518 0.6252 0.0000 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 0.0000 Fugitive Dust 0.6801 0.0000 0.6801 0.0734 0.0000 0.0734 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 228.1119 228.1119 6.4800e003 0.0106 231.4235

5.0700e003 4.5000e- 003 187.4885
Total 0.0662 0.1434 0.7420 2.2300e003 0.2140 2.2200e- 003 0.2162 0.0571 2.0800e- 003 0.0591

1.1900e003 1.8400e- 0.0545 186.0196 186.0196 003 0.2012 1.2900e- 003 Worker 0.0623 0.0455 0.7085 0.2025 0.0534

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0128 9.3000e- 004 0.0137 3.6900e-003 8.9000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Unmitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 8.1431 1.2253 9.3684 3.5393 1.1272 4.6665 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 Fugitive Dust 8.1431 0.0000 8.1431 3.5393 0.0000 3.5393 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.5 Rough Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 228.1119 228.1119 6.4800e003 0.0106 231.4235

5.0700e003 4.5000e- 003 187.4885
Total 0.0662 0.1434 0.7420 2.2300e003 0.1975 2.2200e- 003 0.1997 0.0530 2.0800e- 003 0.0551

1.1900e003 1.8400e- 0.0507 186.0196 186.0196 003 0.1855 1.2900e- 003 Worker 0.0623 0.0455 0.7085 0.1867 0.0495

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0120 9.3000e- 004 0.0129 3.4900e-003 8.9000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Mitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 3.4812 1.2253 4.7064 1.5130 1.1272 2.6403 0.0000 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 0.0000 Fugitive Dust 3.4812 0.0000 3.4812 1.5130 0.0000 1.5130 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,714.9959 5,714.9959 0.3032 0.9068 5,992.7874

0.0000 0.0000 0.0000
Total 0.3950 14.1507 3.3407 0.0522 1.4662 0.1046 1.5707 0.4020 0.1001 0.5020 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3032 0.9068 5,992.7874
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3950 14.1507 3.3407 0.0522 1.4662 0.1046 1.5707 0.4020 0.1001 0.5020 5,714.9959 5,714.9959 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.6 Rough Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,714.9959 5,714.9959 0.3032 0.9068 5,992.7874

0.0000 0.0000 0.0000
Total 0.3950 14.1507 3.3407 0.0522 1.3665 0.1046 1.4711 0.3775 0.1001 0.4776 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3032 0.9068 5,992.7874
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3950 14.1507 3.3407 0.0522 1.3665 0.1046 1.4711 0.3775 0.1001 0.4776 5,714.9959 5,714.9959 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 290.8730 290.8730 8.4400e003 0.0171 296.1906

5.6300e003 5.0000e- 003 208.3205
Total 0.0771 0.2465 0.8543 2.8200e003 0.2492 3.3000e- 003 0.2525 0.0667 3.1100e- 003 0.0698

1.3200e003 2.0400e- 0.0606 206.6884 206.6884 003 0.2236 1.4300e- 003 Worker 0.0692 0.0505 0.7872 0.2250 0.0593

84.1846 84.1846 2.8100e003 0.0121 87.8701

0.0000 0.0000 0.0000
Vendor 7.8700e003 0.1959 0.0672 7.8000e- 004 0.0256 1.8700e- 003 0.0275 7.3800e-003 1.7900e- 003 9.1600e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.7 Utility Trenching - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 290.8730 290.8730 8.4400e003 0.0171 296.1906

5.6300e003 5.0000e- 003 208.3205
Total 0.0771 0.2465 0.8543 2.8200e003 0.2300 3.3000e- 003 0.2333 0.0620 3.1100e- 003 0.0651

1.3200e003 2.0400e- 0.0563 206.6884 206.6884 003 0.2061 1.4300e- 003 Worker 0.0692 0.0505 0.7872 0.2075 0.0550

84.1846 84.1846 2.8100e003 0.0121 87.8701

0.0000 0.0000 0.0000
Vendor 7.8700e003 0.1959 0.0672 7.8000e- 004 0.0240 1.8700e- 003 0.0259 6.9700e-003 1.7900e- 003 8.7600e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 281.2933 281.2933 8.4400e003 0.0220 288.0455

4.2200e003 3.7500e- 003 156.2404
Total 0.0637 0.3318 0.6911 2.7100e003 0.2061 3.8700e- 003 0.2100 0.0555 3.6700e- 003 0.0592

9.9000e004 1.5300e- 0.0455 155.0163 155.0163 003 0.1677 1.0700e- 003 Worker 0.0519 0.0379 0.5904 0.1687 0.0445 126.2770 126.2770 4.2200e003 0.0182 131.8051

0.0000 0.0000 0.0000
Vendor 0.0118 0.2939 0.1008 1.1800e003 0.0384 2.8000e- 003 0.0412 0.0111 2.6800e- 003 0.0137 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Unmitigated Construction Off-Site

9.2600e- 0.1333 0.1333 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.8 Fine Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 281.2933 281.2933 8.4400e003 0.0220 288.0455

4.2200e003 3.7500e- 003 156.2404
Total 0.0637 0.3318 0.6911 2.7100e003 0.1905 3.8700e- 003 0.1944 0.0517 3.6700e- 003 0.0554

9.9000e004 1.5300e- 0.0422 155.0163 155.0163 003 0.1546 1.0700e- 003 Worker 0.0519 0.0379 0.5904 0.1556 0.0413 126.2770 126.2770 4.2200e003 0.0182 131.8051

0.0000 0.0000 0.0000
Vendor 0.0118 0.2939 0.1008 1.1800e003 0.0360 2.8000e- 003 0.0388 0.0105 2.6800e- 003 0.0131 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Mitigated Construction Off-Site

9.2600e- 0.1333 0.1333 0.0000 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,262.8308 9,262.8308 0.4914 1.4697 9,713.0736

0.0000 0.0000 0.0000
Total 0.6402 22.9353 5.4145 0.0846 2.3764 0.1695 2.5459 0.6515 0.1622 0.8137 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4914 1.4697 9,713.0736
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6402 22.9353 5.4145 0.0846 2.3764 0.1695 2.5459 0.6515 0.1622 0.8137 9,262.8308 9,262.8308 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.9 Fine Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,262.8308 9,262.8308 0.4914 1.4697 9,713.0736

0.0000 0.0000 0.0000
Total 0.6402 22.9353 5.4145 0.0846 2.2148 0.1695 2.3843 0.6119 0.1622 0.7741 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4914 1.4697 9,713.0736
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6402 22.9353 5.4145 0.0846 2.2148 0.1695 2.3843 0.6119 0.1622 0.7741 9,262.8308 9,262.8308 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 683.2036 683.2036 0.0190 0.0241 690.8641

0.0169 0.0150 624.9616
Total 0.2135 0.2985 2.4119 6.7200e003 0.6899 5.6900e- 003 0.6956 0.1834 5.2900e- 003 0.1887

3.9500e003 6.1300e- 0.1818 620.0652 620.0652 003 0.6707 4.2900e- 003 Worker 0.2076 0.1516 2.3615 0.6750 0.1779

63.1385 63.1385 2.1100e003 9.1000e- 003 65.9025

0.0000 0.0000 0.0000
Vendor 5.9000e003 0.1470 0.0504 5.9000e- 004 0.0192 1.4000e- 003 0.0206 5.5300e-003 1.3400e- 003 6.8700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 683.2036 683.2036 0.0190 0.0241 690.8641

0.0169 0.0150 624.9616
Total 0.2135 0.2985 2.4119 6.7200e003 0.6362 5.6900e- 003 0.6419 0.1702 5.2900e- 003 0.1755

3.9500e003 6.1300e- 0.1689 620.0652 620.0652 003 0.6182 4.2900e- 003 Worker 0.2076 0.1516 2.3615 0.6225 0.1650

63.1385 63.1385 2.1100e003 9.1000e- 003 65.9025

0.0000 0.0000 0.0000
Vendor 5.9000e003 0.1470 0.0504 5.9000e- 004 0.0180 1.4000e- 003 0.0194 5.2300e-003 1.3400e- 003 6.5700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 660.1300 660.1300 0.0171 0.0225 667.2594

0.0151 0.0139 604.5501
Total 0.1955 0.2490 2.2130 6.5000e003 0.6899 4.6100e- 003 0.6945 0.1834 4.2600e- 003 0.1877

3.7100e003 5.9400e- 0.1816 600.0452 600.0452 003 0.6707 4.0300e- 003 Worker 0.1920 0.1339 2.1684 0.6747 0.1779

60.0847 60.0847 2.0100e003 8.6400e- 003 62.7093

0.0000 0.0000 0.0000
Vendor 3.4500e003 0.1152 0.0446 5.6000e- 004 0.0192 5.8000e- 004 0.0198 5.5300e-003 5.5000e- 004 6.0900e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 660.1300 660.1300 0.0171 0.0225 667.2594

0.0151 0.0139 604.5501
Total 0.1955 0.2490 2.2130 6.5000e003 0.6362 4.6100e- 003 0.6408 0.1702 4.2600e- 003 0.1745

3.7100e003 5.9400e- 0.1687 600.0452 600.0452 003 0.6182 4.0300e- 003 Worker 0.1920 0.1339 2.1684 0.6222 0.1650

60.0847 60.0847 2.0100e003 8.6400e- 003 62.7093

0.0000 0.0000 0.0000
Vendor 3.4500e003 0.1152 0.0446 5.6000e- 004 0.0180 5.8000e- 004 0.0186 5.2300e-003 5.5000e- 004 5.7800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 150.0113 150.0113 3.7800e003 3.4600e- 003 151.1375

3.7800e003 3.4600e- 003 151.1375
Total 0.0480 0.0335 0.5421 1.4800e003 0.1677 1.0100e- 003 0.1687 0.0445 9.3000e- 004 0.0454

9.3000e004 1.4800e- 0.0454 150.0113 150.0113 003 0.1677 1.0100e- 003 Worker 0.0480 0.0335 0.5421 0.1687 0.0445

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Unmitigated Construction Off-Site
Total 1.0222 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1420 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.11 Paving - 2023Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 150.0113 150.0113 3.7800e003 3.4600e- 003 151.1375

3.7800e003 3.4600e- 003 151.1375
Total 0.0480 0.0335 0.5421 1.4800e003 0.1546 1.0100e- 003 0.1556 0.0413 9.3000e- 004 0.0422

9.3000e004 1.4800e- 0.0422 150.0113 150.0113 003 0.1546 1.0100e- 003 Worker 0.0480 0.0335 0.5421 0.1556 0.0413

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Mitigated Construction Off-Site
Total 1.0222 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1420 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.0090 120.0090 3.0300e003 2.7700e- 003 120.9100

3.0300e003 2.7700e- 003 120.9100
Total 0.0384 0.0268 0.4337 1.1900e003 0.1341 8.1000e- 004 0.1349 0.0356 7.4000e- 004 0.0363

7.4000e004 1.1900e- 0.0363 120.0090 120.0090 003 0.1341 8.1000e- 004 Worker 0.0384 0.0268 0.4337 0.1349 0.0356

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Unmitigated Construction Off-Site

2.9700e- 0.0708 0.0708 281.4481 281.4481
003
Total 142.0063 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 Archit. Coating 141.8147 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.12 Architectural Coating - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:10 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.0090 120.0090 3.0300e003 2.7700e- 003 120.9100

3.0300e003 2.7700e- 003 120.9100
Total 0.0384 0.0268 0.4337 1.1900e003 0.1236 8.1000e- 004 0.1244 0.0330 7.4000e- 004 0.0337

7.4000e004 1.1900e- 0.0337 120.0090 120.0090 003 0.1236 8.1000e- 004 Worker 0.0384 0.0268 0.4337 0.1244 0.0330

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Mitigated Construction Off-Site

2.9700e- 0.0708 0.0708 0.0000 281.4481 281.4481
003
Total 142.0063 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 0.0000 Archit. Coating 141.8147 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
Construction Phase - based on info confirmed by applicant Off-road Equipment - Off-road Equipment - Off-road Equipment - no additional equipment required for Asphalt Demolition Haul N2O Intensity (lb/MWhr)

0.004

1.3 User Entered Comments & Non-Default DataProject Characteristics - based on PRIME power mixLand Use - based on info from applicant Utility Company Pico Rivera Innovative Municipal EnergyCO2 Intensity (lb/MWhr) 683.98 CH4 Intensity
(lb/MWhr)

0.033
Precipitation Freq (Days) 33
Climate Zone 9 Operational Year 2023

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2
729
Regional Shopping Center 5.73 1000sqft 0.00 5,730.00 0
Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 0 Recreational Swimming Pool 17.01 1000sqft 0.00 17,010.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed-Use Project Construction Run Los Angeles-South Coast County, Winter

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblArchitecturalCoating EF_Nonresidential_Interior 100.00 50.00 tblAreaCoating Area_Nonresidential_Exterior 11370 9500
tblArchitecturalCoating ConstArea_Residential_Interior 526,946.00 561,391.00tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00tblArchitecturalCoating ConstArea_Parking 15,360.00 11,400.00tblArchitecturalCoating ConstArea_Residential_Exterior 175,649.00 187,130.00tblArchitecturalCoating ConstArea_Nonresidential_Exterior 11,370.00 97,750.00tblArchitecturalCoating ConstArea_Nonresidential_Interior 34,110.00 293,595.00 Energy Use - Construction Off-road Equipment Mitigation - SCAQMD Rule 403 and 1186Fleet Mix - Table Name Column Name Default Value New Value
Architectural Coating - based on info from applicant, residential includes area for pool, nonresidential includes area for int/ext parking structure, parking only includes ki Vehicle Trips -
Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Off-road Equipment - loader HP based on CAT 966 Loader provided by applicantOff-road Equipment - based on info from applicantTrips and VMT - assumes 2 trips/water truck/day. See assumptions file for calculations on dump trucks and hauling tripsDemolition - Grading - Off-road Equipment - based on info from applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - Off-road Equipment - based on info provided by applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 158.00 270.00tblOffRoadEquipment HorsePower 158.00 249.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 97.00 276.00 tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 0.13 0.00tblLandUse LotAcreage 4.36 0.34tblLandUse LotAcreage 0.39 0.00 tblGrading MaterialExported 0.00 20,000.00
tblLandUse LandUseSquareFeet 255,000.00 260,220.00
tblConstructionPhase NumDays 3.00 6.00
tblGrading MaterialExported 0.00 7,400.00
tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 6.00 12.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 20.00 5.00tblConstructionPhase NumDays 6.00 30.00tblConstructionPhase NumDays 220.00 407.00tblConstructionPhase NumDays 20.00 37.00 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstructionPhase NumDays 10.00 19.00
tblAreaCoating Area_Residential_Interior 526946 506918
tblConstDustMitigation CleanPavedRoadPercentReduction 0 9 tblAreaCoating Area_Nonresidential_Interior 34110 28500tblAreaCoating Area_Residential_Exterior 175649 168973 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 4.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 925.00 1,058.00tblTripsAndVMT HaulingTripNumber 2,500.00 2,858.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripNumber 182.00 184.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripLength 20.00 19.00 tblSolidWaste SolidWasteGenerationRate 96.96 76.95tblSolidWaste SolidWasteGenerationRate 6.02 5.78 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment UsageHours 7.00 8.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 78.00 50.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 80.00 134.00tblOffRoadEquipment HorsePower 97.00 225.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.8421 1.5350 15,764.211
0 1.2761 3.1776 0.0000 15,263.959
0 15,263.959
0 Maximum 143.9709 50.9204 32.1392 0.1484 5.0749 1.3431 6.4072 1.9480 4,770.2172 4,770.2172 0.9961 0.0272 4,803.2109

1.8421 1.5350 15,764.211
0 2023 143.9709 22.5391 28.4359 0.0505 0.7907 1.0531 1.8438 0.2115 0.9935 1.2049 0.0000

1.2761 3.1776 0.0000 15,263.959
0 15,263.959
0 2022 4.2611 50.9204 32.1392 0.1484 5.0749 1.3431 6.4072 1.9480 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.8421 1.5350 15,764.211
0 Mitigated Construction

1.2761 5.2384 0.0000 15,263.959
0 15,263.959
0 Maximum 143.9709 50.9204 32.1392 0.1484 9.8930 1.3431 11.2253 4.0089 4,770.2172 4,770.2172 0.9961 0.0272 4,803.2109

1.8421 1.5350 15,764.211
0 2023 143.9709 22.5391 28.4359 0.0505 0.8575 1.0531 1.9106 0.2279 0.9935 1.2213 0.0000

1.2761 5.2384 0.0000 15,263.959
0 15,263.959
0 2022 4.2611 50.9204 32.1392 0.1484 9.8930 1.3431 11.2253 4.0089 N2O CO2e
Year lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.0 Emissions Summary

2.1 Overall Construction (Maximum Daily Emission)Unmitigated Construction ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
tblWater OutdoorWaterUseRate 616,595.89 489,361.82tblWater OutdoorWaterUseRate 260,137.92 249,696.08tblWater IndoorWaterUseRate 1,006,024.88 798,432.44tblWater IndoorWaterUseRate 424,435.55 407,398.87 tblTripsAndVMT WorkerTripNumber 60.00 12.00tblTripsAndVMT WorkerTripNumber 300.00 60.00tblTripsAndVMT VendorTripNumber 0.00 6.00tblTripsAndVMT VendorTripNumber 73.00 3.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Acres of Grading (Site Preparation Phase): 9
Acres of Grading (Grading Phase): 60Acres of Paving: 1.85 Residential Indoor: 561,391; Residential Outdoor: 187,130; Non-Residential Indoor: 293,595; Non-Residential Outdoor: 97,750; Striped Parking Area:
5 19 j
11 Architectural Coating Architectural Coating 11/7/2023 12/1/2023 5 19 k10 Paving Paving 10/11/2023 11/6/2023 5 20 h
9 Building Construction Building Construction 5/12/2022 12/1/2023 5 407 i8 Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 5 60 f
7 Fine Grading Grading 5/12/2022 6/8/2022 5 20 g6 Utility Trenching Trenching 4/14/2022 7/6/2022 5 30 d
5 Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 5 12 e4 Rough Grading Grading 3/3/2022 4/13/2022 5 5b
3 Site Preparation Site Preparation 2/23/2022 3/2/2022 5 6 c2 Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 Num Days
Week
Num Days Phase Description
1 Asphalt Demolition Demolition 1/1/2022 2/22/2022 5 37 a Phase
Number
Phase Name Phase Type Start Date End Date

3.0 Construction DetailConstruction Phase

0.00 0.00 0.00 0.00 0.00
Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 45.44 0.00 37.19 49.03 0.00 32.16 0.00 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Fine Grading Tractors/Loaders/Backhoes 1 8.00 225 0.37

0.43 Fine Grading Rubber Tired Dozers 0 8.00 247 0.40Fine Grading Plate Compactors 5 8.00 7

0.50 Fine Grading Graders 0 8.00 187 0.41Utility Trenching Trenchers 1 8.00 50

0.43 Utility Trenching Tractors/Loaders/Backhoes 1 8.00 225 0.37Utility Trenching Plate Compactors 5 8.00 7

0.37 Utility Trenching Excavators 1 6.00 249 0.38Rough Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97

0.41 Rough Grading Soil Haul Rubber Tired Dozers 0 8.00 247 0.40Rough Grading Soil Haul Graders 0 8.00 187

0.48 Rough Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37Rough Grading Scrapers 1 8.00 367

0.38 Rough Grading Rubber Tired Dozers 1 8.00 247 0.40Rough Grading Rollers 1 8.00 134

0.38 Rough Grading Graders 1 8.00 187 0.41Rough Grading Excavators 1 8.00 270

0.48 Site Preparation Tractors/Loaders/Backhoes 1 7.00 276 0.37Site Preparation Scrapers 1 8.00 367

0.37 Site Preparation Graders 1 8.00 187 0.41Asphalt Demolition Debris Haul Tractors/Loaders/Backhoes 0 8.00 97

0.73 Asphalt Demolition Debris Haul Rubber Tired Dozers 0 8.00 247 0.40Asphalt Demolition Debris Haul Concrete/Industrial Saws 0 8.00 81

0.40 Asphalt Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37Asphalt Demolition Rubber Tired Dozers 1 8.00 247 Load Factor
Asphalt Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power OffRoad Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied HHDT
Architectural Coating 1 12.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTPaving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Building Construction 8 60.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTFine Grading Soil Haul 0 0.00 0.00 2,858.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT
Fine Grading 6 15.00 6.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTUtility Trenching 8 20.00 4.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Rough Grading Soil
Haul
0 0.00 0.00 1,058.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT Rough Grading 7 18.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Site Preparation 3 8.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTAsphalt Demolition 14.70 6.90 19.00 LD_Mix HDT_Mix Debris Haul
0 0.00 0.00 184.00
Hauling
Vehicle Class
Asphalt Demolition 5 13.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

0.48 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor Vehicle
Class
Architectural Coating Air Compressors 1 6.00 78

0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37Paving Rollers 2 8.00 80

0.42 Paving Paving Equipment 1 8.00 132 0.36Paving Pavers 1 8.00 130

0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56Building Construction Welders 3 8.00 46

0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37Building Construction Generator Sets 1 8.00 84

0.29 Building Construction Forklifts 2 7.00 89 0.20Building Construction Cranes 1 8.00 231

0.40 Fine Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97 0.37Fine Grading Soil Haul Rubber Tired Dozers 0 8.00 247Fine Grading Soil Haul Graders 0 8.00 187 0.41 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 169.3525 169.3525 5.1000e003 9.5500e- 003 172.3259

3.7000e003 3.4800e- 003 128.3729
Total 0.0520 0.1383 0.5045 1.6500e003 0.1581 1.8700e- 003 0.1600 0.0422 1.7600e- 003 0.0440

8.6000e004 1.2600e- 0.0394 127.2444 127.2444 003 0.1453 9.3000e- 004 Worker 0.0482 0.0363 0.4698 0.1462 0.0385

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0128 9.4000e- 004 0.0138 3.6900e-003 9.0000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.2 Asphalt Demolition - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

3.1 Mitigation Measures ConstructionReplace Ground CoverWater Exposed AreaReduce Vehicle Speed on Unpaved RoadsClean Paved Roads CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 169.3525 169.3525 5.1000e003 9.5500e- 003 172.3259

3.7000e003 3.4800e- 003 128.3729
Total 0.0520 0.1383 0.5045 1.6500e003 0.1459 1.8700e- 003 0.1478 0.0392 1.7600e- 003 0.0410

8.6000e004 1.2600e- 0.0366 127.2444 127.2444 003 0.1339 9.3000e- 004 Worker 0.0482 0.0363 0.4698 0.1349 0.0358

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0120 9.4000e- 004 0.0129 3.4900e-003 9.0000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,386.1241 2,386.1241 0.1263 0.3786 2,502.1048

0.0000 0.0000 0.0000
Total 0.1608 6.1465 1.4198 0.0218 0.6120 0.0437 0.6557 0.1678 0.0419 0.2096 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1263 0.3786 2,502.1048
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1608 6.1465 1.4198 0.0218 0.6120 0.0437 0.6557 0.1678 0.0419 0.2096 2,386.1241 2,386.1241 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.3 Asphalt Demolition Debris Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,386.1241 2,386.1241 0.1263 0.3786 2,502.1048

0.0000 0.0000 0.0000
Total 0.1608 6.1465 1.4198 0.0218 0.5704 0.0437 0.6141 0.1576 0.0419 0.1994 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1263 0.3786 2,502.1048
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1608 6.1465 1.4198 0.0218 0.5704 0.0437 0.6141 0.1576 0.0419 0.1994 2,386.1241 2,386.1241 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.4124 120.4124 3.6800e003 8.2100e- 003 122.9517

2.2800e003 2.1400e- 003 78.9987
Total 0.0335 0.1243 0.3238 1.1600e003 0.1022 1.5100e- 003 0.1037 0.0274 1.4300e- 003 0.0288

5.3000e004 7.7000e- 0.0242 78.3043 78.3043 004 0.0894 5.7000e- 004 Worker 0.0296 0.0223 0.2891 0.0900 0.0237

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0128 9.4000e- 004 0.0138 3.6900e-003 9.0000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Unmitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 1.5908 0.5998 2.1905 0.1718 0.5518 0.7236 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 Fugitive Dust 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.4 Site Preparation - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.4124 120.4124 3.6800e003 8.2100e- 003 122.9517

2.2800e003 2.1400e- 003 78.9987
Total 0.0335 0.1243 0.3238 1.1600e003 0.0944 1.5100e- 003 0.0959 0.0255 1.4300e- 003 0.0269

5.3000e004 7.7000e- 0.0225 78.3043 78.3043 004 0.0824 5.7000e- 004 Worker 0.0296 0.0223 0.2891 0.0830 0.0220

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0120 9.4000e- 004 0.0129 3.4900e-003 9.0000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Mitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 0.6801 0.5998 1.2798 0.0734 0.5518 0.6252 0.0000 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 0.0000 Fugitive Dust 0.6801 0.0000 0.6801 0.0734 0.0000 0.0734 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 218.2927 218.2927 6.5300e003 0.0109 221.7001

5.1300e003 4.8100e- 003 177.7470
Total 0.0706 0.1523 0.6852 2.1300e003 0.2140 2.2300e- 003 0.2162 0.0571 2.0900e- 003 0.0591

1.1900e003 1.7400e- 0.0545 176.1846 176.1846 003 0.2012 1.2900e- 003 Worker 0.0667 0.0502 0.6505 0.2025 0.0534

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0128 9.4000e- 004 0.0138 3.6900e-003 9.0000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Unmitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 8.1431 1.2253 9.3684 3.5393 1.1272 4.6665 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 Fugitive Dust 8.1431 0.0000 8.1431 3.5393 0.0000 3.5393 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.5 Rough Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 218.2927 218.2927 6.5300e003 0.0109 221.7001

5.1300e003 4.8100e- 003 177.7470
Total 0.0706 0.1523 0.6852 2.1300e003 0.1975 2.2300e- 003 0.1997 0.0530 2.0900e- 003 0.0551

1.1900e003 1.7400e- 0.0507 176.1846 176.1846 003 0.1855 1.2900e- 003 Worker 0.0667 0.0502 0.6505 0.1867 0.0495

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0120 9.4000e- 004 0.0129 3.4900e-003 9.0000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Mitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 3.4812 1.2253 4.7064 1.5130 1.1272 2.6403 0.0000 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 0.0000 Fugitive Dust 3.4812 0.0000 3.4812 1.5130 0.0000 1.5130 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,716.7557 5,716.7557 0.3027 0.9071 5,994.6261

0.0000 0.0000 0.0000
Total 0.3851 14.7260 3.4016 0.0522 1.4662 0.1048 1.5710 0.4020 0.1003 0.5023 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3027 0.9071 5,994.6261
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3851 14.7260 3.4016 0.0522 1.4662 0.1048 1.5710 0.4020 0.1003 0.5023 5,716.7557 5,716.7557 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.6 Rough Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,716.7557 5,716.7557 0.3027 0.9071 5,994.6261

0.0000 0.0000 0.0000
Total 0.3851 14.7260 3.4016 0.0522 1.3665 0.1048 1.4713 0.3775 0.1003 0.4778 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3027 0.9071 5,994.6261
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3851 14.7260 3.4016 0.0522 1.3665 0.1048 1.4713 0.3775 0.1003 0.4778 5,716.7557 5,716.7557 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 279.9769 279.9769 8.5000e003 0.0175 285.4028

5.7000e003 5.3500e- 003 197.4967
Total 0.0819 0.2598 0.7922 2.7200e003 0.2492 3.3000e- 003 0.2525 0.0667 3.1100e- 003 0.0698

1.3200e003 1.9400e- 0.0606 195.7606 195.7606 003 0.2236 1.4300e- 003 Worker 0.0741 0.0558 0.7227 0.2250 0.0593

84.2163 84.2163 2.8000e003 0.0122 87.9061

0.0000 0.0000 0.0000
Vendor 7.7800e003 0.2040 0.0695 7.8000e- 004 0.0256 1.8700e- 003 0.0275 7.3800e-003 1.7900e- 003 9.1700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.7 Utility Trenching - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 279.9769 279.9769 8.5000e003 0.0175 285.4028

5.7000e003 5.3500e- 003 197.4967
Total 0.0819 0.2598 0.7922 2.7200e003 0.2300 3.3000e- 003 0.2333 0.0620 3.1100e- 003 0.0651

1.3200e003 1.9400e- 0.0563 195.7606 195.7606 003 0.2061 1.4300e- 003 Worker 0.0741 0.0558 0.7227 0.2075 0.0550

84.2163 84.2163 2.8000e003 0.0122 87.9061

0.0000 0.0000 0.0000
Vendor 7.7800e003 0.2040 0.0695 7.8000e- 004 0.0240 1.8700e- 003 0.0259 6.9700e-003 1.7900e- 003 8.7700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 273.1449 273.1449 8.4800e003 0.0222 279.9817

4.2700e003 4.0100e- 003 148.1225
Total 0.0672 0.3479 0.6463 2.6300e003 0.2061 3.8800e- 003 0.2100 0.0555 3.6800e- 003 0.0592

9.9000e004 1.4500e- 0.0455 146.8205 146.8205 003 0.1677 1.0700e- 003 Worker 0.0556 0.0419 0.5421 0.1687 0.0445 126.3244 126.3244 4.2100e003 0.0182 131.8592

0.0000 0.0000 0.0000
Vendor 0.0117 0.3060 0.1043 1.1800e003 0.0384 2.8100e- 003 0.0412 0.0111 2.6900e- 003 0.0138 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Unmitigated Construction Off-Site

9.2600e- 0.1333 0.1333 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.8 Fine Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 273.1449 273.1449 8.4800e003 0.0222 279.9817

4.2700e003 4.0100e- 003 148.1225
Total 0.0672 0.3479 0.6463 2.6300e003 0.1905 3.8800e- 003 0.1944 0.0517 3.6800e- 003 0.0554

9.9000e004 1.4500e- 0.0422 146.8205 146.8205 003 0.1546 1.0700e- 003 Worker 0.0556 0.0419 0.5421 0.1556 0.0413 126.3244 126.3244 4.2100e003 0.0182 131.8592

0.0000 0.0000 0.0000
Vendor 0.0117 0.3060 0.1043 1.1800e003 0.0360 2.8100e- 003 0.0388 0.0105 2.6900e- 003 0.0132 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Mitigated Construction Off-Site

9.2600e- 0.1333 0.1333 0.0000 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,265.6831 9,265.6831 0.4906 1.4702 9,716.0537

0.0000 0.0000 0.0000
Total 0.6242 23.8679 5.5133 0.0846 2.3764 0.1699 2.5462 0.6515 0.1625 0.8141 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4906 1.4702 9,716.0537
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6242 23.8679 5.5133 0.0846 2.3764 0.1699 2.5462 0.6515 0.1625 0.8141 9,265.6831 9,265.6831 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.9 Fine Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,265.6831 9,265.6831 0.4906 1.4702 9,716.0537

0.0000 0.0000 0.0000
Total 0.6242 23.8679 5.5133 0.0846 2.2148 0.1699 2.3847 0.6119 0.1625 0.7744 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4906 1.4702 9,716.0537
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6242 23.8679 5.5133 0.0846 2.2148 0.1699 2.3847 0.6119 0.1625 0.7744 9,265.6831 9,265.6831 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 650.4441 650.4441 0.0192 0.0252 658.4197

0.0171 0.0160 592.4901
Total 0.2281 0.3205 2.2203 6.4000e003 0.6899 5.6900e- 003 0.6956 0.1834 5.2900e- 003 0.1887

3.9500e003 5.8100e- 0.1818 587.2819 587.2819 003 0.6707 4.2900e- 003 Worker 0.2222 0.1675 2.1682 0.6750 0.1779

63.1622 63.1622 2.1000e003 9.1100e- 003 65.9296

0.0000 0.0000 0.0000
Vendor 5.8300e003 0.1530 0.0521 5.9000e- 004 0.0192 1.4000e- 003 0.0206 5.5300e-003 1.3400e- 003 6.8800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 650.4441 650.4441 0.0192 0.0252 658.4197

0.0171 0.0160 592.4901
Total 0.2281 0.3205 2.2203 6.4000e003 0.6362 5.6900e- 003 0.6419 0.1702 5.2900e- 003 0.1755

3.9500e003 5.8100e- 0.1689 587.2819 587.2819 003 0.6182 4.2900e- 003 Worker 0.2222 0.1675 2.1682 0.6225 0.1650

63.1622 63.1622 2.1000e003 9.1100e- 003 65.9296

0.0000 0.0000 0.0000
Vendor 5.8300e003 0.1530 0.0521 5.9000e- 004 0.0180 1.4000e- 003 0.0194 5.2300e-003 1.3400e- 003 6.5700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 628.5983 628.5983 0.0173 0.0235 636.0208

0.0153 0.0148 573.2034
Total 0.2096 0.2684 2.0391 6.1800e003 0.6899 4.6100e- 003 0.6945 0.1834 4.2700e- 003 0.1877

3.7100e003 5.6200e- 0.1816 568.4122 568.4122 003 0.6707 4.0300e- 003 Worker 0.2063 0.1479 1.9931 0.6747 0.1779

60.1861 60.1861 2.0000e003 8.6600e- 003 62.8173

0.0000 0.0000 0.0000
Vendor 3.3400e003 0.1206 0.0460 5.6000e- 004 0.0192 5.8000e- 004 0.0198 5.5300e-003 5.6000e- 004 6.0900e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 628.5983 628.5983 0.0173 0.0235 636.0208

0.0153 0.0148 573.2034
Total 0.2096 0.2684 2.0391 6.1800e003 0.6362 4.6100e- 003 0.6408 0.1702 4.2700e- 003 0.1745

3.7100e003 5.6200e- 0.1687 568.4122 568.4122 003 0.6182 4.0300e- 003 Worker 0.2063 0.1479 1.9931 0.6222 0.1650

60.1861 60.1861 2.0000e003 8.6600e- 003 62.8173

0.0000 0.0000 0.0000
Vendor 3.3400e003 0.1206 0.0460 5.6000e- 004 0.0180 5.8000e- 004 0.0186 5.2300e-003 5.6000e- 004 5.7900e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 142.1030 142.1030 3.8300e003 3.7000e- 003 143.3009

3.8300e003 3.7000e- 003 143.3009
Total 0.0516 0.0370 0.4983 1.4100e003 0.1677 1.0100e- 003 0.1687 0.0445 9.3000e- 004 0.0454

9.3000e004 1.4100e- 0.0454 142.1030 142.1030 003 0.1677 1.0100e- 003 Worker 0.0516 0.0370 0.4983 0.1687 0.0445

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Unmitigated Construction Off-Site
Total 1.0222 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1420 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.11 Paving - 2023Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 142.1030 142.1030 3.8300e003 3.7000e- 003 143.3009

3.8300e003 3.7000e- 003 143.3009
Total 0.0516 0.0370 0.4983 1.4100e003 0.1546 1.0100e- 003 0.1556 0.0413 9.3000e- 004 0.0422

9.3000e004 1.4100e- 0.0422 142.1030 142.1030 003 0.1546 1.0100e- 003 Worker 0.0516 0.0370 0.4983 0.1556 0.0413

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Mitigated Construction Off-Site
Total 1.0222 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1420 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 113.6824 113.6824 3.0700e003 2.9600e- 003 114.6407

3.0700e003 2.9600e- 003 114.6407
Total 0.0413 0.0296 0.3986 1.1200e003 0.1341 8.1000e- 004 0.1349 0.0356 7.4000e- 004 0.0363

7.4000e004 1.1200e- 0.0363 113.6824 113.6824 003 0.1341 8.1000e- 004 Worker 0.0413 0.0296 0.3986 0.1349 0.0356

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Unmitigated Construction Off-Site

2.9700e- 0.0708 0.0708 281.4481 281.4481
003
Total 142.0063 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 Archit. Coating 141.8147 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.12 Architectural Coating - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:11 PM
Washington and Rosemead Mixed-Use Project Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 113.6824 113.6824 3.0700e003 2.9600e- 003 114.6407

3.0700e003 2.9600e- 003 114.6407
Total 0.0413 0.0296 0.3986 1.1200e003 0.1236 8.1000e- 004 0.1244 0.0330 7.4000e- 004 0.0337

7.4000e004 1.1200e- 0.0337 113.6824 113.6824 003 0.1236 8.1000e- 004 Worker 0.0413 0.0296 0.3986 0.1244 0.0330

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Mitigated Construction Off-Site

2.9700e- 0.0708 0.0708 0.0000 281.4481 281.4481
003
Total 142.0063 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 0.0000 Archit. Coating 141.8147 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Mitigated Construction Model
Construction Phase - based on info confirmed by applicant Off-road Equipment - Off-road Equipment - Off-road Equipment - no additional equipment required for Asphalt Demolition HaulOff-road Equipment - N2O Intensity (lb/MWhr)

0.004

1.3 User Entered Comments & Non-Default Data
Project Characteristics - based on PRIME power mixLand Use - based on info from applicant Utility Company Pico Rivera Innovative Municipal EnergyCO2 Intensity (lb/MWhr) 683.98 CH4 Intensity
(lb/MWhr)

0.033
Precipitation Freq (Days) 33
Climate Zone 9 Operational Year 2023

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2
729
Regional Shopping Center 5.73 1000sqft 0.00 5,730.00 0
Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 0 Recreational Swimming Pool 17.01 1000sqft 0.00 17,010.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed-Use Project Mitigated Construction Run Los Angeles-South Coast County, Annual

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblAreaCoating Area_Nonresidential_Exterior 11370 9500tblAreaCoating Area_Nonresidential_Interior 34110 28500 tblArchitecturalCoating EF_Nonresidential_Interior 100.00 0.00tblArchitecturalCoating EF_Residential_Interior 50.00 0.00tblArchitecturalCoating ConstArea_Residential_Interior 526,946.00 561,391.00tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00tblArchitecturalCoating ConstArea_Parking 15,360.00 11,400.00tblArchitecturalCoating ConstArea_Residential_Exterior 175,649.00 187,130.00tblArchitecturalCoating ConstArea_Nonresidential_Exterior 11,370.00 97,865.00tblArchitecturalCoating ConstArea_Nonresidential_Interior 34,110.00 293,595.00 Energy Use - Construction Off-road Equipment Mitigation - SCAQMD Rule 403 and 1186Fleet Mix - Table Name Column Name Default Value New Value
Architectural Coating - based on info from applicant, residential includes area for pool, nonresidential includes area for int/ext parking structure, parking only includes parking MM 0VOC i t f i t i Vehicle Trips -
Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Off-road Equipment - loader HP based on CAT 966 Loader provided by applicantOff-road Equipment - based on info from applicantTrips and VMT - assumes 2 trips/water truck/day. See assumptions file for calculations on dump trucks and hauling tripsDemolition - Grading - Off-road Equipment - based on info from applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - Off-road Equipment - based on info provided by applicantOff-road Equipment - no additional equipment required for Grading Soil Haul CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 158.00 249.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 158.00 270.00tblOffRoadEquipment HorsePower 80.00 134.00 tblLandUse LotAcreage 0.13 0.00
tblOffRoadEquipment HorsePower 97.00 276.00
tblLandUse LotAcreage 0.39 0.00tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 1.03 1.03tblLandUse LotAcreage 0.48 0.48tblLandUse LandUseSquareFeet 255,000.00 260,220.00tblLandUse LotAcreage 4.36 0.34 tblGrading MaterialExported 0.00 7,400.00tblGrading MaterialExported 0.00 20,000.00 tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 3.00 6.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 6.00 30.00tblConstructionPhase NumDays 6.00 12.00tblConstructionPhase NumDays 20.00 37.00tblConstructionPhase NumDays 20.00 5.00tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 220.00 407.00 tblConstDustMitigation CleanPavedRoadPercentReduction 0 9tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblAreaCoating Area_Residential_Exterior 175649 168973tblAreaCoating Area_Residential_Interior 526946 506918 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblTripsAndVMT VendorTripNumber 0.00 4.00tblTripsAndVMT VendorTripNumber 0.00 6.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 2,500.00 2,858.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 182.00 184.00tblTripsAndVMT HaulingTripNumber 925.00 1,058.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripLength 20.00 19.00 tblSolidWaste SolidWasteGenerationRate 6.02 5.78
tblTripsAndVMT HaulingTripLength 20.00 19.00
tblOffRoadEquipment UsageHours 7.00 8.00
tblSolidWaste SolidWasteGenerationRate 96.96 76.95
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 78.00 50.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Maximum 0.5979 2.6735 2.3152 5.9100e-003 0.1611 0.1084 0.2695 0.0508 0.1024 0.1532 0.0000 524.4936 524.4936 0.0910 0.0221 533.3450 337.9894 337.9894 0.0539 2.6300e003 340.1221

0.0910 0.0221 533.3450
2023 0.5979 1.7623 2.0934 3.9800e-003 0.0775 0.0790 0.1565 0.0208 0.0756 0.0963 0.00002022 0.2965 2.6735 2.3152 5.9100e-003 0.1611 0.1084 0.2695 0.0508 0.1024 0.1532 0.0000 524.4936 524.4936 CH4 N2O CO2e
Year tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0910 0.0221 533.3454
Mitigated Construction
Maximum 0.5979 2.6735 2.3152 5.9100e-003 0.2538 0.1084 0.3622 0.0853 0.1024 0.1877 0.0000 524.4940 524.4940 337.9897 337.9897 0.0539 2.6300e003 340.1224

0.0910 0.0221 533.3454
2023 0.5979 1.7623 2.0934 3.9800e-003 0.0840 0.0790 0.1630 0.0224 0.0756 0.0979 0.00002022 0.2965 2.6735 2.3152 5.9100e-003 0.2538 0.1084 0.3622 0.0853 0.1024 0.1877 0.0000 524.4940 524.4940 N2O CO2e
Year tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.1 Overall Construction
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
tblWater OutdoorWaterUseRate 260,137.92 249,696.08

2.0 Emissions Summary
tblWater IndoorWaterUseRate 424,435.55 407,398.87tblWater OutdoorWaterUseRate 616,595.89 489,361.82 tblTripsAndVMT WorkerTripNumber 300.00 60.00
tblWater IndoorWaterUseRate 1,006,024.88 798,432.44
tblTripsAndVMT VendorTripNumber 73.00 3.00tblTripsAndVMT WorkerTripNumber 60.00 12.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Acres of Grading (Site Preparation Phase): 9
5 19 j
11 Architectural Coating Architectural Coating 11/7/2023 12/1/2023 5 19 k10 Paving Paving 10/11/2023 11/6/2023 5 20 h
9 Building Construction Building Construction 5/12/2022 12/1/2023 5 407 i8 Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 5 60 f
7 Fine Grading Grading 5/12/2022 6/8/2022 5 20 g6 Utility Trenching Trenching 4/14/2022 7/6/2022 5 30 d
5 Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 5 12 e4 Rough Grading Grading 3/3/2022 4/13/2022 5 5b
3 Site Preparation Site Preparation 2/23/2022 3/2/2022 5 6 c2 Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 Num Days
Week
Num Days Phase Description
1 Asphalt Demolition Demolition 1/1/2022 2/22/2022 5 37 a Phase
Number
Phase Name Phase Type Start Date End Date

3.0 Construction Detail
Construction Phase
Highest 1.3540 1.3540
7 7-1-2023 9-30-2023 0.5186 0.51866 4-1-2023 6-30-2023 0.5129 0.51295 1-1-2023 3-31-2023 0.5084 0.50844 10-1-2022 12-31-2022 0.5588 0.55883 7-1-2022 9-30-2022 0.5766 0.57662 4-1-2022 6-30-2022 1.3540 1.35401 1-1-2022 3-31-2022 1.0444 1.0444 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter)

0.00 0.00 0.00 0.00 0.00
Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 29.36 0.00 18.89 33.51 0.00 12.62 0.00 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.50 Fine Grading Graders 0 8.00 187 0.41Utility Trenching Trenchers 1 8.00 50

0.43 Utility Trenching Tractors/Loaders/Backhoes 1 8.00 225 0.37Utility Trenching Plate Compactors 5 8.00 7

0.37 Utility Trenching Excavators 1 6.00 249 0.38Rough Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97

0.41 Rough Grading Soil Haul Rubber Tired Dozers 0 8.00 247 0.40Rough Grading Soil Haul Graders 0 8.00 187

0.48 Rough Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37Rough Grading Scrapers 1 8.00 367

0.38 Rough Grading Rubber Tired Dozers 1 8.00 247 0.40Rough Grading Rollers 1 8.00 134

0.38 Rough Grading Graders 1 8.00 187 0.41Rough Grading Excavators 1 8.00 270

0.48 Site Preparation Tractors/Loaders/Backhoes 1 7.00 276 0.37Site Preparation Scrapers 1 8.00 367

0.37 Site Preparation Graders 1 8.00 187 0.41Asphalt Demolition Debris Haul Tractors/Loaders/Backhoes 0 8.00 97

0.73 Asphalt Demolition Debris Haul Rubber Tired Dozers 0 8.00 247 0.40Asphalt Demolition Debris Haul Concrete/Industrial Saws 0 8.00 81

0.40 Asphalt Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37Asphalt Demolition Rubber Tired Dozers 1 8.00 247 Load Factor
Asphalt Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Acres of Grading (Grading Phase): 60Acres of Paving: 1.86010101010101 Residential Indoor: 561,391; Residential Outdoor: 187,130; Non-Residential Indoor: 293,595; Non-Residential Outdoor: 97,865; Striped Parking Area: 11,400 OffRoad Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Fine Grading Soil Haul 0 0.00 0.00 2,858.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT HHDT
Fine Grading 6 15.00 6.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTUtility Trenching 8 20.00 4.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Rough Grading Soil
Haul
0 0.00 0.00 1,058.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT Rough Grading 7 18.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Site Preparation 3 8.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTAsphalt Demolition 14.70 6.90 19.00 LD_Mix HDT_Mix Debris Haul
0 0.00 0.00 184.00
Hauling
Vehicle Class
Asphalt Demolition 5 13.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

0.48 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor Vehicle
Class
Architectural Coating Air Compressors 1 6.00 78

0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37Paving Rollers 2 8.00 80

0.42 Paving Paving Equipment 1 8.00 132 0.36Paving Pavers 1 8.00 130

0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56Building Construction Welders 3 8.00 46

0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37Building Construction Generator Sets 1 8.00 84

0.29 Building Construction Forklifts 2 7.00 89 0.20Building Construction Cranes 1 8.00 231

0.40 Fine Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97 0.37Fine Grading Soil Haul Rubber Tired Dozers 0 8.00 247

0.37 Fine Grading Soil Haul Graders 0 8.00 187 0.41Fine Grading Tractors/Loaders/Backhoes 1 8.00 225

0.43 Fine Grading Rubber Tired Dozers 0 8.00 247 0.40Fine Grading Plate Compactors 5 8.00 7 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.8740 2.8740 8.0000e005 1.6000e- 004 2.9242

6.0000e005 6.0000e- 005 2.1867
Total 8.9000e004 2.5900e-003 9.5500e-003 3.0000e-005 2.8700e-003 4.0000e- 005 2.9000e-003 7.7000e- 004 4.0000e- 005 8.0000e-004 0.0000

2.0000e005 2.0000e-005 2.6400e-003 2.0000e- 7.2000e-004 0.0000 2.1675 2.1675 005 2.6500e-003 7.0000e- 004 Worker 8.2000e- 004 6.9000e-004 8.9200e-003

0.7065 0.7065 2.0000e005 1.0000e- 004 0.7375

0.0000 0.0000 0.0000
Vendor 7.0000e005 1.9000e-003 6.3000e-004 1.0000e-005 2.3000e-004 2.0000e- 005 2.5000e-004 7.0000e- 005 2.0000e- 005 8.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

38.9937 38.9937 9.9400e003 0.0000 39.2421

9.9400e003 0.0000 39.2421
Total 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 Off-Road 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 38.9937 38.9937 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.2 Asphalt Demolition - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

3.1 Mitigation Measures Construction
Replace Ground CoverWater Exposed AreaReduce Vehicle Speed on Unpaved RoadsClean Paved Roads HHDT
Architectural Coating 1 12.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTPaving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_MixBuilding Construction 8 60.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.8740 2.8740 8.0000e005 1.6000e- 004 2.9242

6.0000e005 6.0000e- 005 2.1867
Total 8.9000e004 2.5900e-003 9.5500e-003 3.0000e-005 2.6500e-003 4.0000e- 005 2.6900e-003 7.1000e- 004 4.0000e- 005 7.5000e-004 0.0000

2.0000e005 2.0000e-005 2.4300e-003 2.0000e- 6.7000e-004 0.0000 2.1675 2.1675 005 2.4500e-003 6.5000e- 004 Worker 8.2000e- 004 6.9000e-004 8.9200e-003

0.7065 0.7065 2.0000e005 1.0000e- 004 0.7375

0.0000 0.0000 0.0000
Vendor 7.0000e005 1.9000e-003 6.3000e-004 1.0000e-005 2.2000e-004 2.0000e- 005 2.4000e-004 6.0000e- 005 2.0000e- 005 8.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

38.9937 38.9937 9.9400e003 0.0000 39.2421

9.9400e003 0.0000 39.2421
Total 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 Off-Road 0.0313 0.3075 0.2583 4.5000e-004 0.0155 0.0155 0.0145 0.0145 0.0000 38.9937 38.9937 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

5.4107 5.4107 2.9000e004 8.6000e- 004 5.6737

0.0000 0.0000 0.0000
Total 4.1000e004 0.0156 3.5100e-003 5.0000e-005 1.5000e-003 1.1000e- 004 1.6100e-003 4.1000e- 004 1.0000e- 004 5.2000e-004 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

2.9000e004 8.6000e- 004 5.6737
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.0000e004 5.0000e-005 1.5000e-003 1.1000e- 5.2000e-004 0.0000 5.4107 5.4107 004 1.6100e-003 4.1000e- 004 Hauling 4.1000e- 004 0.0156 3.5100e-003 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Unmitigated Construction Off-Site

0.0000 0.0197 0.0000 0.0197 2.9800e- 0.0000 2.9800e-003 0.0000 0.0000 0.0000 003
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0197 0.0000 0.0197 2.9800e- 0.0000 2.9800e-003 0.0000 0.0000 0.0000 003
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.3 Asphalt Demolition Debris Haul - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

5.4107 5.4107 2.9000e004 8.6000e- 004 5.6737

0.0000 0.0000 0.0000
Total 4.1000e004 0.0156 3.5100e-003 5.0000e-005 1.4000e-003 1.1000e- 004 1.5100e-003 3.9000e- 004 1.0000e- 004 4.9000e-004 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

2.9000e004 8.6000e- 004 5.6737
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.0000e004 5.0000e-005 1.4000e-003 1.1000e- 4.9000e-004 0.0000 5.4107 5.4107 004 1.5100e-003 3.9000e- 004 Hauling 4.1000e- 004 0.0156 3.5100e-003 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Mitigated Construction Off-Site

0.0000 8.4100e-003 0.0000 8.4100e-003 1.2700e- 0.0000 1.2700e-003 0.0000 0.0000 0.0000 003
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

8.4100e-003 0.0000 8.4100e-003 1.2700e- 0.0000 1.2700e-003 0.0000 0.0000 0.0000 003
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.3309 0.3309 1.0000e005 3.0000e- 005 0.3378

1.0000e005 1.0000e- 005 0.2182
Total 9.0000e005 3.8000e-004 9.9000e-004 0.0000 3.0000e-004 0.0000 3.0000e-004 8.0000e- 005 0.0000 8.0000e-005 0.0000

0.0000 2.6000e-004 0.0000 2.6000e-004 7.0000e- 0.0000 7.0000e-005 0.0000 0.2163 0.2163 005
Worker 8.0000e005 7.0000e-005 8.9000e-004

0.1146 0.1146 0.0000 2.0000e005 0.1196

0.0000 0.0000 0.0000
Vendor 1.0000e005 3.1000e-004 1.0000e-004 0.0000 4.0000e-005 0.0000 4.0000e-005 1.0000e- 005 0.0000 1.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.5100e003 0.0000 7.8222
Unmitigated Construction Off-Site

1.6600e003 9.0000e-005 4.7700e-003 1.8000e- 2.1800e-003 0.0000 7.7594 7.7594 003 6.5700e-003 5.2000e- 004 Total 4.4600e- 003 0.0494 0.0304

7.7594 7.7594 2.5100e003 0.0000 7.8222

0.0000 0.0000 0.0000
Off-Road 4.4600e003 0.0494 0.0304 9.0000e-005 1.8000e- 003 1.8000e-003 1.6600e- 003 1.6600e-003 0.0000

4.7700e-003 0.0000 4.7700e-003 5.2000e- 0.0000 5.2000e-004 0.0000 0.0000 0.0000 004
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.4 Site Preparation - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.3309 0.3309 1.0000e005 3.0000e- 005 0.3378

1.0000e005 1.0000e- 005 0.2182
Total 9.0000e005 3.8000e-004 9.9000e-004 0.0000 2.8000e-004 0.0000 2.8000e-004 7.0000e- 005 0.0000 8.0000e-005 0.0000

0.0000 2.4000e-004 0.0000 2.4000e-004 6.0000e- 0.0000 7.0000e-005 0.0000 0.2163 0.2163 005
Worker 8.0000e005 7.0000e-005 8.9000e-004

0.1146 0.1146 0.0000 2.0000e005 0.1196

0.0000 0.0000 0.0000
Vendor 1.0000e005 3.1000e-004 1.0000e-004 0.0000 4.0000e-005 0.0000 4.0000e-005 1.0000e- 005 0.0000 1.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.5100e003 0.0000 7.8222
Mitigated Construction Off-Site

1.6600e003 9.0000e-005 2.0400e-003 1.8000e- 1.8800e-003 0.0000 7.7594 7.7594 003 3.8400e-003 2.2000e- 004 Total 4.4600e- 003 0.0494 0.0304

7.7594 7.7594 2.5100e003 0.0000 7.8222

0.0000 0.0000 0.0000
Off-Road 4.4600e003 0.0494 0.0304 9.0000e-005 1.8000e- 003 1.8000e-003 1.6600e- 003 1.6600e-003 0.0000

2.0400e-003 0.0000 2.0400e-003 2.2000e- 0.0000 2.2000e-004 0.0000 0.0000 0.0000 004
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

3.0062 3.0062 9.0000e005 1.5000e- 004 3.0529

7.0000e005 7.0000e- 005 2.4549
Total 9.8000e004 2.3100e-003 0.0105 4.0000e-005 3.1500e-003 3.0000e- 005 3.1800e-003 8.4000e- 004 3.0000e- 005 8.7000e-004 0.0000

2.0000e005 3.0000e-005 2.9600e-003 2.0000e- 8.0000e-004 0.0000 2.4334 2.4334 005 2.9800e-003 7.9000e- 004 Worker 9.2000e- 004 7.7000e-004 0.0100

0.5729 0.5729 2.0000e005 8.0000e- 005 0.5980

0.0000 0.0000 0.0000
Vendor 6.0000e005 1.5400e-003 5.1000e-004 1.0000e-005 1.9000e-004 1.0000e- 005 2.0000e-004 5.0000e- 005 1.0000e- 005 7.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0209 0.0000 65.0167
Unmitigated Construction Off-Site
Total 0.0411 0.4402 0.3020 7.3000e-004 0.1222 0.0184 0.1405 0.0531 0.0169 0.0700 0.0000 64.4952 64.4952

64.4952 64.4952 0.0209 0.0000 65.0167

0.0000 0.0000 0.0000
Off-Road 0.0411 0.4402 0.3020 7.3000e-004 0.0184 0.0184 0.0169 0.0169 0.0000 Fugitive Dust 0.1222 0.0000 0.1222 0.0531 0.0000 0.0531 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.5 Rough Grading - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

3.0062 3.0062 9.0000e005 1.5000e- 004 3.0529

7.0000e005 7.0000e- 005 2.4549
Total 9.8000e004 2.3100e-003 0.0105 4.0000e-005 2.9100e-003 3.0000e- 005 2.9400e-003 7.8000e- 004 3.0000e- 005 8.2000e-004 0.0000

2.0000e005 3.0000e-005 2.7300e-003 2.0000e- 7.5000e-004 0.0000 2.4334 2.4334 005 2.7500e-003 7.3000e- 004 Worker 9.2000e- 004 7.7000e-004 0.0100

0.5729 0.5729 2.0000e005 8.0000e- 005 0.5980

0.0000 0.0000 0.0000
Vendor 6.0000e005 1.5400e-003 5.1000e-004 1.0000e-005 1.8000e-004 1.0000e- 005 1.9000e-004 5.0000e- 005 1.0000e- 005 7.0000e-005 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0209 0.0000 65.0166
Mitigated Construction Off-Site
Total 0.0411 0.4402 0.3020 7.3000e-004 0.0522 0.0184 0.0706 0.0227 0.0169 0.0396 0.0000 64.4951 64.4951

64.4951 64.4951 0.0209 0.0000 65.0166

0.0000 0.0000 0.0000
Off-Road 0.0411 0.4402 0.3020 7.3000e-004 0.0184 0.0184 0.0169 0.0169 0.0000 Fugitive Dust 0.0522 0.0000 0.0522 0.0227 0.0000 0.0227 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

31.1114 31.1114 1.6500e003 4.9400e- 003 32.6236

0.0000 0.0000 0.0000
Total 2.3400e003 0.0894 0.0202 3.1000e-004 8.6500e-003 6.3000e- 004 9.2700e-003 2.3800e- 003 6.0000e- 004 2.9800e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

1.6500e003 4.9400e- 003 32.6236
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

6.0000e004 3.1000e-004 8.6500e-003 6.3000e- 2.9800e-003 0.0000 31.1114 31.1114 004 9.2700e-003 2.3800e- 003 Hauling 2.3400e- 003 0.0894 0.0202 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Unmitigated Construction Off-Site

0.0000 4.2000e-004 0.0000 4.2000e-004 6.0000e- 0.0000 6.0000e-005 0.0000 0.0000 0.0000 005
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

4.2000e-004 0.0000 4.2000e-004 6.0000e- 0.0000 6.0000e-005 0.0000 0.0000 0.0000 005
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.6 Rough Grading Soil Haul - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

31.1114 31.1114 1.6500e003 4.9400e- 003 32.6236

0.0000 0.0000 0.0000
Total 2.3400e003 0.0894 0.0202 3.1000e-004 8.0600e-003 6.3000e- 004 8.6900e-003 2.2300e- 003 6.0000e- 004 2.8300e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

1.6500e003 4.9400e- 003 32.6236
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

6.0000e004 3.1000e-004 8.0600e-003 6.3000e- 2.8300e-003 0.0000 31.1114 31.1114 004 8.6900e-003 2.2300e- 003 Hauling 2.3400e- 003 0.0894 0.0202 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Mitigated Construction Off-Site

0.0000 1.8000e-004 0.0000 1.8000e-004 3.0000e- 0.0000 3.0000e-005 0.0000 0.0000 0.0000 005
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.8000e-004 0.0000 1.8000e-004 3.0000e- 0.0000 3.0000e-005 0.0000 0.0000 0.0000 005
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

7.6990 7.6990 2.4000e004 4.8000e- 004 7.8473

1.6000e004 1.5000e- 004 5.4554
Total 2.2900e003 7.8800e-003 0.0243 8.0000e-005 7.3300e-003 1.0000e- 004 7.4300e-003 1.9700e- 003 9.0000e- 005 2.0600e-003 0.0000

4.0000e005 6.0000e-005 6.5700e-003 4.0000e- 1.7900e-003 0.0000 5.4075 5.4075 005 6.6200e-003 1.7500e- 003 Worker 2.0600e- 003 1.7100e-003 0.0222

2.2915 2.2915 8.0000e005 3.3000e- 004 2.3919

0.0000 0.0000 0.0000
Vendor 2.3000e004 6.1700e-003 2.0500e-003 2.0000e-005 7.6000e-004 6.0000e- 005 8.1000e-004 2.2000e- 004 5.0000e- 005 2.7000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

45.2951 45.2951 0.0138 0.0000 45.6388

0.0138 0.0000 45.6388
Total 0.0286 0.2271 0.1796 5.3000e-004 9.5100e003 9.5100e-003 8.8500e- 003 8.8500e-003 0.0000

8.8500e003 5.3000e-004 9.5100e- 8.8500e-003 0.0000 45.2951 45.2951 003 Off-Road 0.0286 0.2271 0.1796 9.5100e-003 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.7 Utility Trenching - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

7.6990 7.6990 2.4000e004 4.8000e- 004 7.8473

1.6000e004 1.5000e- 004 5.4554
Total 2.2900e003 7.8800e-003 0.0243 8.0000e-005 6.7700e-003 1.0000e- 004 6.8600e-003 1.8300e- 003 9.0000e- 005 1.9200e-003 0.0000

4.0000e005 6.0000e-005 6.0600e-003 4.0000e- 1.6600e-003 0.0000 5.4075 5.4075 005 6.1000e-003 1.6200e- 003 Worker 2.0600e- 003 1.7100e-003 0.0222

2.2915 2.2915 8.0000e005 3.3000e- 004 2.3919

0.0000 0.0000 0.0000
Vendor 2.3000e004 6.1700e-003 2.0500e-003 2.0000e-005 7.1000e-004 6.0000e- 005 7.6000e-004 2.1000e- 004 5.0000e- 005 2.6000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

45.2950 45.2950 0.0138 0.0000 45.6387

0.0138 0.0000 45.6387
Total 0.0286 0.2271 0.1796 5.3000e-004 9.5100e003 9.5100e-003 8.8500e- 003 8.8500e-003 0.0000

8.8500e003 5.3000e-004 9.5100e- 8.8500e-003 0.0000 45.2950 45.2950 003 Off-Road 0.0286 0.2271 0.1796 9.5100e-003 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.4976 2.4976 8.0000e005 2.1000e- 004 2.5598

4.0000e005 4.0000e- 005 1.3638
Total 6.3000e004 3.5200e-003 6.5800e-003 2.0000e-005 2.0200e-003 4.0000e- 005 2.0600e-003 5.5000e- 004 4.0000e- 005 5.9000e-004 0.0000

1.0000e005 1.0000e-005 1.6400e-003 1.0000e- 4.5000e-004 0.0000 1.3519 1.3519 005 1.6500e-003 4.4000e- 004 Worker 5.1000e- 004 4.3000e-004 5.5600e-003

1.1458 1.1458 4.0000e005 1.7000e- 004 1.1960

0.0000 0.0000 0.0000
Vendor 1.2000e004 3.0900e-003 1.0200e-003 1.0000e-005 3.8000e-004 3.0000e- 005 4.1000e-004 1.1000e- 004 3.0000e- 005 1.4000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.1700e003 0.0000 7.6847
Unmitigated Construction Off-Site

1.3300e003 9.0000e-005 0.0000 1.4100e- 1.3300e-003 0.0000 7.6305 7.6305 003 Total 4.5000e- 1.4100e-003 0.0000 003 0.0395 0.0263

7.6305 7.6305 2.1700e003 0.0000 7.6847

0.0000 0.0000 0.0000
Off-Road 4.5000e003 0.0395 0.0263 9.0000e-005 1.4100e- 003 1.4100e-003 1.3300e- 003 1.3300e-003 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.8 Fine Grading - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

2.4976 2.4976 8.0000e005 2.1000e- 004 2.5598

4.0000e005 4.0000e- 005 1.3638
Total 6.3000e004 3.5200e-003 6.5800e-003 2.0000e-005 1.8700e-003 4.0000e- 005 1.9100e-003 5.1000e- 004 4.0000e- 005 5.4000e-004 0.0000

1.0000e005 1.0000e-005 1.5200e-003 1.0000e- 4.1000e-004 0.0000 1.3519 1.3519 005 1.5300e-003 4.1000e- 004 Worker 5.1000e- 004 4.3000e-004 5.5600e-003

1.1458 1.1458 4.0000e005 1.7000e- 004 1.1960

0.0000 0.0000 0.0000
Vendor 1.2000e004 3.0900e-003 1.0200e-003 1.0000e-005 3.5000e-004 3.0000e- 005 3.8000e-004 1.0000e- 004 3.0000e- 005 1.3000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.1700e003 0.0000 7.6847
Mitigated Construction Off-Site

1.3300e003 9.0000e-005 0.0000 1.4100e- 1.3300e-003 0.0000 7.6305 7.6305 003 Total 4.5000e- 1.4100e-003 0.0000 003 0.0395 0.0263

7.6305 7.6305 2.1700e003 0.0000 7.6847

0.0000 0.0000 0.0000
Off-Road 4.5000e003 0.0395 0.0263 9.0000e-005 1.4100e- 003 1.4100e-003 1.3300e- 003 1.3300e-003 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

84.0418 84.0418 4.4500e003 0.0133 88.1270

0.0000 0.0000 0.0000
Total 6.3300e003 0.2415 0.0545 8.5000e-004 0.0234 1.7000e- 003 0.0251 6.4200e- 003 1.6200e- 003 8.0400e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

4.4500e003 0.0133 88.1270
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.6200e003 8.5000e-004 0.0234 1.7000e- 8.0400e-003 0.0000 84.0418 84.0418 003 0.0251 6.4200e- 003 Hauling 6.3300e- 003 0.2415 0.0545 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Unmitigated Construction Off-Site

0.0000 1.1300e-003 0.0000 1.1300e-003 1.7000e- 0.0000 1.7000e-004 0.0000 0.0000 0.0000 004
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.1300e-003 0.0000 1.1300e-003 1.7000e- 0.0000 1.7000e-004 0.0000 0.0000 0.0000 004
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.9 Fine Grading Soil Haul - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

84.0418 84.0418 4.4500e003 0.0133 88.1270

0.0000 0.0000 0.0000
Total 6.3300e003 0.2415 0.0545 8.5000e-004 0.0218 1.7000e- 003 0.0235 6.0300e- 003 1.6200e- 003 7.6500e-003 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

4.4500e003 0.0133 88.1270
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

1.6200e003 8.5000e-004 0.0218 1.7000e- 7.6500e-003 0.0000 84.0418 84.0418 003 0.0235 6.0300e- 003 Hauling 6.3300e- 003 0.2415 0.0545 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000 0.0000
Mitigated Construction Off-Site

0.0000 4.8000e-004 0.0000 4.8000e-004 7.0000e- 0.0000 7.0000e-005 0.0000 0.0000 0.0000 005
Total 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

4.8000e-004 0.0000 4.8000e-004 7.0000e- 0.0000 7.0000e-005 0.0000 0.0000 0.0000 005
Fugitive Dust
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

49.9357 49.9357 1.4600e003 1.9200e- 003 50.5454

1.3000e003 1.2300e- 003 45.5523
Total 0.0177 0.0272 0.1900 5.4000e-004 0.0565 4.8000e004 0.0570 0.0150 4.4000e- 004 0.0155 0.0000

3.3000e004 4.9000e-004 0.0549 3.6000e- 0.0149 0.0000 45.1522 45.1522 004 Worker 0.0172 0.0143 0.1857 0.0553 0.0146

4.7835 4.7835 1.6000e004 6.9000e- 004 4.9931

0.0000 0.0000 0.0000
Vendor 4.9000e004 0.0129 4.2700e-003 5.0000e-005 1.5800e-003 1.2000e- 004 1.7000e-003 4.6000e- 004 1.1000e- 004 5.7000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
173.4129 173.4129 0.0335 0.0000 174.2493

0.0335 0.0000 174.2493
Total 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 Off-Road 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 173.4129 173.4129 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2022
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

49.9357 49.9357 1.4600e003 1.9200e- 003 50.5454

1.3000e003 1.2300e- 003 45.5523
Total 0.0177 0.0272 0.1900 5.4000e-004 0.0521 4.8000e004 0.0526 0.0140 4.4000e- 004 0.0144 0.0000

3.3000e004 4.9000e-004 0.0506 3.6000e- 0.0139 0.0000 45.1522 45.1522 004 Worker 0.0172 0.0143 0.1857 0.0510 0.0135

4.7835 4.7835 1.6000e004 6.9000e- 004 4.9931

0.0000 0.0000 0.0000
Vendor 4.9000e004 0.0129 4.2700e-003 5.0000e-005 1.4800e-003 1.2000e- 004 1.6000e-003 4.3000e- 004 1.1000e- 004 5.4000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
173.4127 173.4127 0.0335 0.0000 174.2491

0.0335 0.0000 174.2491
Total 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 Off-Road 0.1549 1.2194 1.1985 2.0900e-003 0.0586 0.0586 0.0562 0.0562 0.0000 173.4127 173.4127 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

69.3472 69.3472 1.8900e003 2.5700e- 003 70.1623

1.6700e003 1.6300e- 003 63.3305
Total 0.0233 0.0327 0.2507 7.5000e-004 0.0812 5.5000e004 0.0817 0.0216 5.2000e- 004 0.0221 0.0000

4.5000e004 6.8000e-004 0.0789 4.8000e- 0.0214 0.0000 62.8016 62.8016 004 Worker 0.0228 0.0181 0.2453 0.0794 0.0210

6.5456 6.5456 2.2000e004 9.4000e- 004 6.8318

0.0000 0.0000 0.0000
Vendor 4.1000e004 0.0145 5.4300e-003 7.0000e-005 2.2700e-003 7.0000e- 005 2.3400e-003 6.5000e- 004 7.0000e- 005 7.2000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
249.2425 249.2425 0.0471 0.0000 250.4209

0.0471 0.0000 250.4209
Total 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 Off-Road 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 249.2425 249.2425 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

69.3472 69.3472 1.8900e003 2.5700e- 003 70.1623

1.6700e003 1.6300e- 003 63.3305
Total 0.0233 0.0327 0.2507 7.5000e-004 0.0749 5.5000e004 0.0754 0.0201 5.2000e- 004 0.0206 0.0000

4.5000e004 6.8000e-004 0.0727 4.8000e- 0.0199 0.0000 62.8016 62.8016 004 Worker 0.0228 0.0181 0.2453 0.0732 0.0194

6.5456 6.5456 2.2000e004 9.4000e- 004 6.8318

0.0000 0.0000 0.0000
Vendor 4.1000e004 0.0145 5.4300e-003 7.0000e-005 2.1200e-003 7.0000e- 005 2.1900e-003 6.2000e- 004 7.0000e- 005 6.9000e-004 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
249.2422 249.2422 0.0471 0.0000 250.4206

0.0471 0.0000 250.4206
Total 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 Off-Road 0.2056 1.6349 1.7057 3.0000e-003 0.0736 0.0736 0.0706 0.0706 0.0000 249.2422 249.2422 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.2430 1.2430 3.0000e005 3.0000e- 005 1.2534

3.0000e005 3.0000e- 005 1.2534
Total 4.5000e004 3.6000e-004 4.8600e-003 1.0000e-005 1.5600e-003 1.0000e- 005 1.5700e-003 4.1000e- 004 1.0000e- 005 4.2000e-004 0.0000

1.0000e005 1.0000e-005 1.5600e-003 1.0000e- 4.2000e-004 0.0000 1.2430 1.2430 005 1.5700e-003 4.1000e- 004 Worker 4.5000e- 004 3.6000e-004 4.8600e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

4.6700e003 0.0000 14.8539
Unmitigated Construction Off-Site

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7372 14.7372 003 Total 9.7100e- 4.1200e-003 003 0.0818 0.1110

0.0000 0.0000 0.0000 0.0000 0.0000

4.6700e003 0.0000 14.8539
Paving 1.3500e003 0.0000 0.0000 0.0000 0.0000 0.0000

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7372 14.7372 003 Off-Road 8.3600e- 4.1200e-003 003 0.0818 0.1110 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.11 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.2430 1.2430 3.0000e005 3.0000e- 005 1.2534

3.0000e005 3.0000e- 005 1.2534
Total 4.5000e004 3.6000e-004 4.8600e-003 1.0000e-005 1.4400e-003 1.0000e- 005 1.4500e-003 3.8000e- 004 1.0000e- 005 3.9000e-004 0.0000

1.0000e005 1.0000e-005 1.4400e-003 1.0000e- 3.9000e-004 0.0000 1.2430 1.2430 005 1.4500e-003 3.8000e- 004 Worker 4.5000e- 004 3.6000e-004 4.8600e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

4.6700e003 0.0000 14.8539
Mitigated Construction Off-Site

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7371 14.7371 003 Total 9.7100e- 4.1200e-003 003 0.0818 0.1110

0.0000 0.0000 0.0000 0.0000 0.0000

4.6700e003 0.0000 14.8539
Paving 1.3500e003 0.0000 0.0000 0.0000 0.0000 0.0000

3.8000e003 1.7000e-004 4.1200e- 3.8000e-003 0.0000 14.7371 14.7371 003 Off-Road 8.3600e- 4.1200e-003 003 0.0818 0.1110 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.9944 0.9944 3.0000e005 3.0000e- 005 1.0027

3.0000e005 3.0000e- 005 1.0027
Total 3.6000e004 2.9000e-004 3.8800e-003 1.0000e-005 1.2500e-003 1.0000e- 005 1.2600e-003 3.3000e- 004 1.0000e- 005 3.4000e-004 0.0000

1.0000e005 1.0000e-005 1.2500e-003 1.0000e- 3.4000e-004 0.0000 0.9944 0.9944 005 1.2600e-003 3.3000e- 004 Worker 3.6000e- 004 2.9000e-004 3.8800e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5000e004 0.0000 2.4292
Unmitigated Construction Off-Site

6.7000e004 3.0000e-005 6.7000e- 6.7000e-004 0.0000 2.4256 2.4256 004 Total 0.3585 0.0124 0.0172 6.7000e-004

2.4256 2.4256 1.5000e004 0.0000 2.4292

0.0000 0.0000 0.0000
Off-Road 1.8200e003 0.0124 0.0172 3.0000e-005 6.7000e- 004 6.7000e-004 6.7000e- 004 6.7000e-004 0.0000 Archit. Coating 0.3567 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.12 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:15 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

0.9944 0.9944 3.0000e005 3.0000e- 005 1.0027

3.0000e005 3.0000e- 005 1.0027
Total 3.6000e004 2.9000e-004 3.8800e-003 1.0000e-005 1.1500e-003 1.0000e- 005 1.1600e-003 3.1000e- 004 1.0000e- 005 3.1000e-004 0.0000

1.0000e005 1.0000e-005 1.1500e-003 1.0000e- 3.1000e-004 0.0000 0.9944 0.9944 005 1.1600e-003 3.1000e- 004 Worker 3.6000e- 004 2.9000e-004 3.8800e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5000e004 0.0000 2.4292
Mitigated Construction Off-Site

6.7000e004 3.0000e-005 6.7000e- 6.7000e-004 0.0000 2.4256 2.4256 004 Total 0.3585 0.0124 0.0172 6.7000e-004

2.4256 2.4256 1.5000e004 0.0000 2.4292

0.0000 0.0000 0.0000
Off-Road 1.8200e003 0.0124 0.0172 3.0000e-005 6.7000e- 004 6.7000e-004 6.7000e- 004 6.7000e-004 0.0000 Archit. Coating 0.3567 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
Construction Phase - based on info confirmed by applicant Off-road Equipment - Off-road Equipment - Off-road Equipment - no additional equipment required for Asphalt Demolition Haul N2O Intensity (lb/MWhr)

0.004

1.3 User Entered Comments & Non-Default DataProject Characteristics - based on PRIME power mixLand Use - based on info from applicant Utility Company Pico Rivera Innovative Municipal EnergyCO2 Intensity (lb/MWhr) 683.98 CH4 Intensity
(lb/MWhr)

0.033
Precipitation Freq (Days) 33
Climate Zone 9 Operational Year 2023

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2
729
Regional Shopping Center 5.73 1000sqft 0.00 5,730.00 0
Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 0 Recreational Swimming Pool 17.01 1000sqft 0.00 17,010.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed-Use Project Mitigated Construction Run Los Angeles-South Coast County, Summer

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblArchitecturalCoating EF_Nonresidential_Interior 100.00 0.00tblArchitecturalCoating EF_Residential_Interior 50.00 0.00tblArchitecturalCoating ConstArea_Residential_Interior 526,946.00 561,391.00tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00tblArchitecturalCoating ConstArea_Parking 15,360.00 11,400.00tblArchitecturalCoating ConstArea_Residential_Exterior 175,649.00 187,130.00tblArchitecturalCoating ConstArea_Nonresidential_Exterior 11,370.00 97,865.00tblArchitecturalCoating ConstArea_Nonresidential_Interior 34,110.00 293,595.00 Energy Use - Construction Off-road Equipment Mitigation - SCAQMD Rule 403 and 1186Fleet Mix - Table Name Column Name Default Value New Value
Architectural Coating - based on info from applicant, residential includes area for pool, nonresidential includes area for int/ext parking structure, parking only includes ki MM 0VOC i t f i t i Vehicle Trips -
Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Off-road Equipment - loader HP based on CAT 966 Loader provided by applicantOff-road Equipment - based on info from applicantTrips and VMT - assumes 2 trips/water truck/day. See assumptions file for calculations on dump trucks and hauling tripsDemolition - Grading - Off-road Equipment - based on info from applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - Off-road Equipment - based on info provided by applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblOffRoadEquipment HorsePower 158.00 270.00tblOffRoadEquipment HorsePower 80.00 134.00 tblLandUse LotAcreage 0.13 0.00
tblOffRoadEquipment HorsePower 97.00 276.00
tblLandUse LotAcreage 0.39 0.00tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 1.03 1.03tblLandUse LotAcreage 0.48 0.48tblLandUse LandUseSquareFeet 255,000.00 260,220.00tblLandUse LotAcreage 4.36 0.34 tblGrading MaterialExported 0.00 7,400.00tblGrading MaterialExported 0.00 20,000.00 tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 3.00 6.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 6.00 30.00tblConstructionPhase NumDays 6.00 12.00tblConstructionPhase NumDays 20.00 37.00tblConstructionPhase NumDays 20.00 5.00tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 220.00 407.00 tblConstDustMitigation CleanPavedRoadPercentReduction 0 9tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblAreaCoating Area_Residential_Exterior 175649 168973tblAreaCoating Area_Residential_Interior 526946 506918tblAreaCoating Area_Nonresidential_Exterior 11370 9500tblAreaCoating Area_Nonresidential_Interior 34110 28500 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblTripsAndVMT HaulingTripNumber 2,500.00 2,858.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 182.00 184.00tblTripsAndVMT HaulingTripNumber 925.00 1,058.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripLength 20.00 19.00 tblSolidWaste SolidWasteGenerationRate 6.02 5.78
tblTripsAndVMT HaulingTripLength 20.00 19.00
tblOffRoadEquipment UsageHours 7.00 8.00
tblSolidWaste SolidWasteGenerationRate 96.96 76.95
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 78.00 50.00tblOffRoadEquipment HorsePower 158.00 249.00tblOffRoadEquipment HorsePower 8.00 7.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.8426 1.5328 15,812.527
0 1.2757 3.1774 0.0000 15,312.910
8 15,312.910
8 Maximum 39.6821 49.9364 32.3389 0.1489 5.0749 1.3427 6.4070 1.9480 4,809.6571 4,809.6571 0.9959 0.0260 4,842.2862

1.8426 1.5328 15,812.527
0 2023 39.6821 22.5162 28.6536 0.0509 0.7907 1.0531 1.8438 0.2115 0.9935 1.2049 0.0000

1.2757 3.1774 0.0000 15,312.910
8 15,312.910
8 2022 4.2542 49.9364 32.3389 0.1489 5.0749 1.3427 6.4070 1.9480 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.8426 1.5328 15,812.527
0 Mitigated Construction

1.2757 5.2382 0.0000 15,312.910
8 15,312.910
8 Maximum 39.6821 49.9364 32.3389 0.1489 9.8930 1.3427 11.2251 4.0089 4,809.6571 4,809.6571 0.9959 0.0260 4,842.2862

1.8426 1.5328 15,812.527
0 2023 39.6821 22.5162 28.6536 0.0509 0.8575 1.0531 1.9106 0.2279 0.9935 1.2213 0.0000

1.2757 5.2382 0.0000 15,312.910
8 15,312.910
8 2022 4.2542 49.9364 32.3389 0.1489 9.8930 1.3427 11.2251 4.0089 N2O CO2e
Year lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.1 Overall Construction (Maximum Daily Emission)Unmitigated Construction ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
tblWater OutdoorWaterUseRate 260,137.92 249,696.08

2.0 Emissions Summary
tblWater IndoorWaterUseRate 424,435.55 407,398.87tblWater OutdoorWaterUseRate 616,595.89 489,361.82 tblTripsAndVMT WorkerTripNumber 300.00 60.00
tblWater IndoorWaterUseRate 1,006,024.88 798,432.44
tblTripsAndVMT VendorTripNumber 73.00 3.00tblTripsAndVMT WorkerTripNumber 60.00 12.00tblTripsAndVMT VendorTripNumber 0.00 4.00tblTripsAndVMT VendorTripNumber 0.00 6.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 2.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Acres of Grading (Site Preparation Phase): 9
Acres of Grading (Grading Phase): 60Acres of Paving: 1.86010101010101 Residential Indoor: 561,391; Residential Outdoor: 187,130; Non-Residential Indoor: 293,595; Non-Residential Outdoor: 97,865; Striped Parking Area:
5 19 j
11 Architectural Coating Architectural Coating 11/7/2023 12/1/2023 5 19 k10 Paving Paving 10/11/2023 11/6/2023 5 20 h
9 Building Construction Building Construction 5/12/2022 12/1/2023 5 407 i8 Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 5 60 f
7 Fine Grading Grading 5/12/2022 6/8/2022 5 20 g6 Utility Trenching Trenching 4/14/2022 7/6/2022 5 30 d
5 Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 5 12 e4 Rough Grading Grading 3/3/2022 4/13/2022 5 5b
3 Site Preparation Site Preparation 2/23/2022 3/2/2022 5 6 c2 Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 Num Days
Week
Num Days Phase Description
1 Asphalt Demolition Demolition 1/1/2022 2/22/2022 5 37 a Phase
Number
Phase Name Phase Type Start Date End Date

3.0 Construction DetailConstruction Phase

0.00 0.00 0.00 0.00 0.00
Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 45.44 0.00 37.19 49.03 0.00 32.16 0.00 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Fine Grading Tractors/Loaders/Backhoes 1 8.00 225 0.37

0.43 Fine Grading Rubber Tired Dozers 0 8.00 247 0.40Fine Grading Plate Compactors 5 8.00 7

0.50 Fine Grading Graders 0 8.00 187 0.41Utility Trenching Trenchers 1 8.00 50

0.43 Utility Trenching Tractors/Loaders/Backhoes 1 8.00 225 0.37Utility Trenching Plate Compactors 5 8.00 7

0.37 Utility Trenching Excavators 1 6.00 249 0.38Rough Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97

0.41 Rough Grading Soil Haul Rubber Tired Dozers 0 8.00 247 0.40Rough Grading Soil Haul Graders 0 8.00 187

0.48 Rough Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37Rough Grading Scrapers 1 8.00 367

0.38 Rough Grading Rubber Tired Dozers 1 8.00 247 0.40Rough Grading Rollers 1 8.00 134

0.38 Rough Grading Graders 1 8.00 187 0.41Rough Grading Excavators 1 8.00 270

0.48 Site Preparation Tractors/Loaders/Backhoes 1 7.00 276 0.37Site Preparation Scrapers 1 8.00 367

0.37 Site Preparation Graders 1 8.00 187 0.41Asphalt Demolition Debris Haul Tractors/Loaders/Backhoes 0 8.00 97

0.73 Asphalt Demolition Debris Haul Rubber Tired Dozers 0 8.00 247 0.40Asphalt Demolition Debris Haul Concrete/Industrial Saws 0 8.00 81

0.40 Asphalt Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37Asphalt Demolition Rubber Tired Dozers 1 8.00 247 Load Factor
Asphalt Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power OffRoad Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied HHDT
Architectural Coating 1 12.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTPaving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Building Construction 8 60.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTFine Grading Soil Haul 0 0.00 0.00 2,858.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT
Fine Grading 6 15.00 6.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTUtility Trenching 8 20.00 4.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Rough Grading Soil
Haul
0 0.00 0.00 1,058.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT Rough Grading 7 18.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Site Preparation 3 8.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTAsphalt Demolition 14.70 6.90 19.00 LD_Mix HDT_Mix Debris Haul
0 0.00 0.00 184.00
Hauling
Vehicle Class
Asphalt Demolition 5 13.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

0.48 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor Vehicle
Class
Architectural Coating Air Compressors 1 6.00 78

0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37Paving Rollers 2 8.00 80

0.42 Paving Paving Equipment 1 8.00 132 0.36Paving Pavers 1 8.00 130

0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56Building Construction Welders 3 8.00 46

0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37Building Construction Generator Sets 1 8.00 84

0.29 Building Construction Forklifts 2 7.00 89 0.20Building Construction Cranes 1 8.00 231

0.40 Fine Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97 0.37Fine Grading Soil Haul Rubber Tired Dozers 0 8.00 247Fine Grading Soil Haul Graders 0 8.00 187 0.41 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 176.4398 176.4398 5.0700e003 9.3200e- 003 179.3434

3.6600e003 3.2500e- 003 135.4083
Total 0.0489 0.1308 0.5453 1.7200e003 0.1581 1.8600e- 003 0.1600 0.0422 1.7500e- 003 0.0440

8.6000e004 1.3300e- 0.0394 134.3475 134.3475 003 0.1453 9.3000e- 004 Worker 0.0450 0.0328 0.5117 0.1462 0.0385

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0128 9.3000e- 004 0.0137 3.6900e-003 8.9000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.2 Asphalt Demolition - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

3.1 Mitigation Measures ConstructionReplace Ground CoverWater Exposed AreaReduce Vehicle Speed on Unpaved RoadsClean Paved Roads CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 176.4398 176.4398 5.0700e003 9.3200e- 003 179.3434

3.6600e003 3.2500e- 003 135.4083
Total 0.0489 0.1308 0.5453 1.7200e003 0.1459 1.8600e- 003 0.1478 0.0392 1.7500e- 003 0.0410

8.6000e004 1.3300e- 0.0366 134.3475 134.3475 003 0.1339 9.3000e- 004 Worker 0.0450 0.0328 0.5117 0.1349 0.0358

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0120 9.3000e- 004 0.0129 3.4900e-003 8.9000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,385.3896 2,385.3896 0.1266 0.3785 2,501.3374

0.0000 0.0000 0.0000
Total 0.1649 5.9064 1.3944 0.0218 0.6120 0.0437 0.6556 0.1678 0.0418 0.2095 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1266 0.3785 2,501.3374
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1649 5.9064 1.3944 0.0218 0.6120 0.0437 0.6556 0.1678 0.0418 0.2095 2,385.3896 2,385.3896 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.3 Asphalt Demolition Debris Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,385.3896 2,385.3896 0.1266 0.3785 2,501.3374

0.0000 0.0000 0.0000
Total 0.1649 5.9064 1.3944 0.0218 0.5704 0.0437 0.6140 0.1576 0.0418 0.1993 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1266 0.3785 2,501.3374
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1649 5.9064 1.3944 0.0218 0.5704 0.0437 0.6140 0.1576 0.0418 0.1993 2,385.3896 2,385.3896 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 124.7677 124.7677 3.6600e003 8.0700e- 003 127.2632

2.2500e003 2.0000e- 003 83.3282
Total 0.0316 0.1182 0.3485 1.2100e003 0.1022 1.5000e- 003 0.1037 0.0274 1.4200e- 003 0.0288

5.3000e004 8.2000e- 0.0242 82.6754 82.6754 004 0.0894 5.7000e- 004 Worker 0.0277 0.0202 0.3149 0.0900 0.0237

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0128 9.3000e- 004 0.0137 3.6900e-003 8.9000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Unmitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 1.5908 0.5998 2.1905 0.1718 0.5518 0.7236 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 Fugitive Dust 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.4 Site Preparation - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 124.7677 124.7677 3.6600e003 8.0700e- 003 127.2632

2.2500e003 2.0000e- 003 83.3282
Total 0.0316 0.1182 0.3485 1.2100e003 0.0944 1.5000e- 003 0.0959 0.0255 1.4200e- 003 0.0269

5.3000e004 8.2000e- 0.0225 82.6754 82.6754 004 0.0824 5.7000e- 004 Worker 0.0277 0.0202 0.3149 0.0830 0.0220

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0120 9.3000e- 004 0.0129 3.4900e-003 8.9000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Mitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 0.6801 0.5998 1.2798 0.0734 0.5518 0.6252 0.0000 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 0.0000 Fugitive Dust 0.6801 0.0000 0.6801 0.0734 0.0000 0.0734 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 228.1119 228.1119 6.4800e003 0.0106 231.4235

5.0700e003 4.5000e- 003 187.4885
Total 0.0662 0.1434 0.7420 2.2300e003 0.2140 2.2200e- 003 0.2162 0.0571 2.0800e- 003 0.0591

1.1900e003 1.8400e- 0.0545 186.0196 186.0196 003 0.2012 1.2900e- 003 Worker 0.0623 0.0455 0.7085 0.2025 0.0534

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0128 9.3000e- 004 0.0137 3.6900e-003 8.9000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Unmitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 8.1431 1.2253 9.3684 3.5393 1.1272 4.6665 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 Fugitive Dust 8.1431 0.0000 8.1431 3.5393 0.0000 3.5393 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.5 Rough Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 228.1119 228.1119 6.4800e003 0.0106 231.4235

5.0700e003 4.5000e- 003 187.4885
Total 0.0662 0.1434 0.7420 2.2300e003 0.1975 2.2200e- 003 0.1997 0.0530 2.0800e- 003 0.0551

1.1900e003 1.8400e- 0.0507 186.0196 186.0196 003 0.1855 1.2900e- 003 Worker 0.0623 0.0455 0.7085 0.1867 0.0495

42.0923 42.0923 1.4100e003 6.0700e- 003 43.9350

0.0000 0.0000 0.0000
Vendor 3.9400e003 0.0980 0.0336 3.9000e- 004 0.0120 9.3000e- 004 0.0129 3.4900e-003 8.9000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Mitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 3.4812 1.2253 4.7064 1.5130 1.1272 2.6403 0.0000 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 0.0000 Fugitive Dust 3.4812 0.0000 3.4812 1.5130 0.0000 1.5130 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,714.9959 5,714.9959 0.3032 0.9068 5,992.7874

0.0000 0.0000 0.0000
Total 0.3950 14.1507 3.3407 0.0522 1.4662 0.1046 1.5707 0.4020 0.1001 0.5020 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3032 0.9068 5,992.7874
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3950 14.1507 3.3407 0.0522 1.4662 0.1046 1.5707 0.4020 0.1001 0.5020 5,714.9959 5,714.9959 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.6 Rough Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,714.9959 5,714.9959 0.3032 0.9068 5,992.7874

0.0000 0.0000 0.0000
Total 0.3950 14.1507 3.3407 0.0522 1.3665 0.1046 1.4711 0.3775 0.1001 0.4776 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3032 0.9068 5,992.7874
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3950 14.1507 3.3407 0.0522 1.3665 0.1046 1.4711 0.3775 0.1001 0.4776 5,714.9959 5,714.9959 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 290.8730 290.8730 8.4400e003 0.0171 296.1906

5.6300e003 5.0000e- 003 208.3205
Total 0.0771 0.2465 0.8543 2.8200e003 0.2492 3.3000e- 003 0.2525 0.0667 3.1100e- 003 0.0698

1.3200e003 2.0400e- 0.0606 206.6884 206.6884 003 0.2236 1.4300e- 003 Worker 0.0692 0.0505 0.7872 0.2250 0.0593

84.1846 84.1846 2.8100e003 0.0121 87.8701

0.0000 0.0000 0.0000
Vendor 7.8700e003 0.1959 0.0672 7.8000e- 004 0.0256 1.8700e- 003 0.0275 7.3800e-003 1.7900e- 003 9.1600e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.7 Utility Trenching - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 290.8730 290.8730 8.4400e003 0.0171 296.1906

5.6300e003 5.0000e- 003 208.3205
Total 0.0771 0.2465 0.8543 2.8200e003 0.2300 3.3000e- 003 0.2333 0.0620 3.1100e- 003 0.0651

1.3200e003 2.0400e- 0.0563 206.6884 206.6884 003 0.2061 1.4300e- 003 Worker 0.0692 0.0505 0.7872 0.2075 0.0550

84.1846 84.1846 2.8100e003 0.0121 87.8701

0.0000 0.0000 0.0000
Vendor 7.8700e003 0.1959 0.0672 7.8000e- 004 0.0240 1.8700e- 003 0.0259 6.9700e-003 1.7900e- 003 8.7600e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 281.2933 281.2933 8.4400e003 0.0220 288.0455

4.2200e003 3.7500e- 003 156.2404
Total 0.0637 0.3318 0.6911 2.7100e003 0.2061 3.8700e- 003 0.2100 0.0555 3.6700e- 003 0.0592

9.9000e004 1.5300e- 0.0455 155.0163 155.0163 003 0.1677 1.0700e- 003 Worker 0.0519 0.0379 0.5904 0.1687 0.0445 126.2770 126.2770 4.2200e003 0.0182 131.8051

0.0000 0.0000 0.0000
Vendor 0.0118 0.2939 0.1008 1.1800e003 0.0384 2.8000e- 003 0.0412 0.0111 2.6800e- 003 0.0137 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Unmitigated Construction Off-Site

9.2600e- 0.1333 0.1333 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.8 Fine Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 281.2933 281.2933 8.4400e003 0.0220 288.0455

4.2200e003 3.7500e- 003 156.2404
Total 0.0637 0.3318 0.6911 2.7100e003 0.1905 3.8700e- 003 0.1944 0.0517 3.6700e- 003 0.0554

9.9000e004 1.5300e- 0.0422 155.0163 155.0163 003 0.1546 1.0700e- 003 Worker 0.0519 0.0379 0.5904 0.1556 0.0413 126.2770 126.2770 4.2200e003 0.0182 131.8051

0.0000 0.0000 0.0000
Vendor 0.0118 0.2939 0.1008 1.1800e003 0.0360 2.8000e- 003 0.0388 0.0105 2.6800e- 003 0.0131 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Mitigated Construction Off-Site

9.2600e- 0.1333 0.1333 0.0000 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,262.8308 9,262.8308 0.4914 1.4697 9,713.0736

0.0000 0.0000 0.0000
Total 0.6402 22.9353 5.4145 0.0846 2.3764 0.1695 2.5459 0.6515 0.1622 0.8137 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4914 1.4697 9,713.0736
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6402 22.9353 5.4145 0.0846 2.3764 0.1695 2.5459 0.6515 0.1622 0.8137 9,262.8308 9,262.8308 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.9 Fine Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,262.8308 9,262.8308 0.4914 1.4697 9,713.0736

0.0000 0.0000 0.0000
Total 0.6402 22.9353 5.4145 0.0846 2.2148 0.1695 2.3843 0.6119 0.1622 0.7741 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4914 1.4697 9,713.0736
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6402 22.9353 5.4145 0.0846 2.2148 0.1695 2.3843 0.6119 0.1622 0.7741 9,262.8308 9,262.8308 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 683.2036 683.2036 0.0190 0.0241 690.8641

0.0169 0.0150 624.9616
Total 0.2135 0.2985 2.4119 6.7200e003 0.6899 5.6900e- 003 0.6956 0.1834 5.2900e- 003 0.1887

3.9500e003 6.1300e- 0.1818 620.0652 620.0652 003 0.6707 4.2900e- 003 Worker 0.2076 0.1516 2.3615 0.6750 0.1779

63.1385 63.1385 2.1100e003 9.1000e- 003 65.9025

0.0000 0.0000 0.0000
Vendor 5.9000e003 0.1470 0.0504 5.9000e- 004 0.0192 1.4000e- 003 0.0206 5.5300e-003 1.3400e- 003 6.8700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 683.2036 683.2036 0.0190 0.0241 690.8641

0.0169 0.0150 624.9616
Total 0.2135 0.2985 2.4119 6.7200e003 0.6362 5.6900e- 003 0.6419 0.1702 5.2900e- 003 0.1755

3.9500e003 6.1300e- 0.1689 620.0652 620.0652 003 0.6182 4.2900e- 003 Worker 0.2076 0.1516 2.3615 0.6225 0.1650

63.1385 63.1385 2.1100e003 9.1000e- 003 65.9025

0.0000 0.0000 0.0000
Vendor 5.9000e003 0.1470 0.0504 5.9000e- 004 0.0180 1.4000e- 003 0.0194 5.2300e-003 1.3400e- 003 6.5700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 660.1300 660.1300 0.0171 0.0225 667.2594

0.0151 0.0139 604.5501
Total 0.1955 0.2490 2.2130 6.5000e003 0.6899 4.6100e- 003 0.6945 0.1834 4.2600e- 003 0.1877

3.7100e003 5.9400e- 0.1816 600.0452 600.0452 003 0.6707 4.0300e- 003 Worker 0.1920 0.1339 2.1684 0.6747 0.1779

60.0847 60.0847 2.0100e003 8.6400e- 003 62.7093

0.0000 0.0000 0.0000
Vendor 3.4500e003 0.1152 0.0446 5.6000e- 004 0.0192 5.8000e- 004 0.0198 5.5300e-003 5.5000e- 004 6.0900e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 660.1300 660.1300 0.0171 0.0225 667.2594

0.0151 0.0139 604.5501
Total 0.1955 0.2490 2.2130 6.5000e003 0.6362 4.6100e- 003 0.6408 0.1702 4.2600e- 003 0.1745

3.7100e003 5.9400e- 0.1687 600.0452 600.0452 003 0.6182 4.0300e- 003 Worker 0.1920 0.1339 2.1684 0.6222 0.1650

60.0847 60.0847 2.0100e003 8.6400e- 003 62.7093

0.0000 0.0000 0.0000
Vendor 3.4500e003 0.1152 0.0446 5.6000e- 004 0.0180 5.8000e- 004 0.0186 5.2300e-003 5.5000e- 004 5.7800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 150.0113 150.0113 3.7800e003 3.4600e- 003 151.1375

3.7800e003 3.4600e- 003 151.1375
Total 0.0480 0.0335 0.5421 1.4800e003 0.1677 1.0100e- 003 0.1687 0.0445 9.3000e- 004 0.0454

9.3000e004 1.4800e- 0.0454 150.0113 150.0113 003 0.1677 1.0100e- 003 Worker 0.0480 0.0335 0.5421 0.1687 0.0445

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Unmitigated Construction Off-Site
Total 1.0227 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1425 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.11 Paving - 2023Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 150.0113 150.0113 3.7800e003 3.4600e- 003 151.1375

3.7800e003 3.4600e- 003 151.1375
Total 0.0480 0.0335 0.5421 1.4800e003 0.1546 1.0100e- 003 0.1556 0.0413 9.3000e- 004 0.0422

9.3000e004 1.4800e- 0.0422 150.0113 150.0113 003 0.1546 1.0100e- 003 Worker 0.0480 0.0335 0.5421 0.1556 0.0413

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Mitigated Construction Off-Site
Total 1.0227 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1425 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.0090 120.0090 3.0300e003 2.7700e- 003 120.9100

3.0300e003 2.7700e- 003 120.9100
Total 0.0384 0.0268 0.4337 1.1900e003 0.1341 8.1000e- 004 0.1349 0.0356 7.4000e- 004 0.0363

7.4000e004 1.1900e- 0.0363 120.0090 120.0090 003 0.1341 8.1000e- 004 Worker 0.0384 0.0268 0.4337 0.1349 0.0356

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Unmitigated Construction Off-Site

2.9700e- 0.0708 0.0708 281.4481 281.4481
003
Total 37.7346 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 Archit. Coating 37.5429 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.12 Architectural Coating - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:17 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.0090 120.0090 3.0300e003 2.7700e- 003 120.9100

3.0300e003 2.7700e- 003 120.9100
Total 0.0384 0.0268 0.4337 1.1900e003 0.1236 8.1000e- 004 0.1244 0.0330 7.4000e- 004 0.0337

7.4000e004 1.1900e- 0.0337 120.0090 120.0090 003 0.1236 8.1000e- 004 Worker 0.0384 0.0268 0.4337 0.1244 0.0330

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Mitigated Construction Off-Site

2.9700e- 0.0708 0.0708 0.0000 281.4481 281.4481
003
Total 37.7346 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 0.0000 Archit. Coating 37.5429 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
Construction Phase - based on info confirmed by applicant Off-road Equipment - Off-road Equipment - Off-road Equipment - no additional equipment required for Asphalt Demolition Haul N2O Intensity (lb/MWhr)

0.004

1.3 User Entered Comments & Non-Default DataProject Characteristics - based on PRIME power mixLand Use - based on info from applicant Utility Company Pico Rivera Innovative Municipal EnergyCO2 Intensity (lb/MWhr) 683.98 CH4 Intensity
(lb/MWhr)

0.033
Precipitation Freq (Days) 33
Climate Zone 9 Operational Year 2023

1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2
729
Regional Shopping Center 5.73 1000sqft 0.00 5,730.00 0
Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 0 Recreational Swimming Pool 17.01 1000sqft 0.00 17,010.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed-Use Project Mitigated Construction Run Los Angeles-South Coast County, Winter

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblArchitecturalCoating EF_Nonresidential_Interior 100.00 0.00tblArchitecturalCoating EF_Residential_Interior 50.00 0.00tblArchitecturalCoating ConstArea_Residential_Interior 526,946.00 561,391.00tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00tblArchitecturalCoating ConstArea_Parking 15,360.00 11,400.00tblArchitecturalCoating ConstArea_Residential_Exterior 175,649.00 187,130.00tblArchitecturalCoating ConstArea_Nonresidential_Exterior 11,370.00 97,865.00tblArchitecturalCoating ConstArea_Nonresidential_Interior 34,110.00 293,595.00 Energy Use - Construction Off-road Equipment Mitigation - SCAQMD Rule 403 and 1186Fleet Mix - Table Name Column Name Default Value New Value
Architectural Coating - based on info from applicant, residential includes area for pool, nonresidential includes area for int/ext parking structure, parking only includes ki MM 0VOC i t f i t i Vehicle Trips -
Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Off-road Equipment - loader HP based on CAT 966 Loader provided by applicantOff-road Equipment - based on info from applicantTrips and VMT - assumes 2 trips/water truck/day. See assumptions file for calculations on dump trucks and hauling tripsDemolition - Grading - Off-road Equipment - based on info from applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - Off-road Equipment - based on info provided by applicantOff-road Equipment - no additional equipment required for Grading Soil HaulOff-road Equipment - CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblOffRoadEquipment HorsePower 158.00 270.00tblOffRoadEquipment HorsePower 80.00 134.00 tblLandUse LotAcreage 0.13 0.00
tblOffRoadEquipment HorsePower 97.00 276.00
tblLandUse LotAcreage 0.39 0.00tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 1.03 1.03tblLandUse LotAcreage 0.48 0.48tblLandUse LandUseSquareFeet 255,000.00 260,220.00tblLandUse LotAcreage 4.36 0.34 tblGrading MaterialExported 0.00 7,400.00tblGrading MaterialExported 0.00 20,000.00 tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 3.00 6.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 6.00 20.00tblConstructionPhase NumDays 6.00 30.00tblConstructionPhase NumDays 6.00 12.00tblConstructionPhase NumDays 20.00 37.00tblConstructionPhase NumDays 20.00 5.00tblConstructionPhase NumDays 10.00 19.00tblConstructionPhase NumDays 220.00 407.00 tblConstDustMitigation CleanPavedRoadPercentReduction 0 9tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblAreaCoating Area_Residential_Exterior 175649 168973tblAreaCoating Area_Residential_Interior 526946 506918tblAreaCoating Area_Nonresidential_Exterior 11370 9500tblAreaCoating Area_Nonresidential_Interior 34110 28500 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied tblTripsAndVMT HaulingTripNumber 2,500.00 2,858.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT HaulingTripNumber 182.00 184.00tblTripsAndVMT HaulingTripNumber 925.00 1,058.00tblTripsAndVMT HaulingTripLength 20.00 19.00tblTripsAndVMT HaulingTripLength 20.00 19.00 tblSolidWaste SolidWasteGenerationRate 6.02 5.78
tblTripsAndVMT HaulingTripLength 20.00 19.00
tblOffRoadEquipment UsageHours 7.00 8.00
tblSolidWaste SolidWasteGenerationRate 96.96 76.95
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00tblOffRoadEquipment HorsePower 8.00 7.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 97.00 225.00tblOffRoadEquipment HorsePower 78.00 50.00tblOffRoadEquipment HorsePower 158.00 249.00tblOffRoadEquipment HorsePower 8.00 7.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied

1.8421 1.5350 15,764.211
0 1.2761 3.1776 0.0000 15,263.959
0 15,263.959
0 Maximum 39.6991 50.9204 32.1392 0.1484 5.0749 1.3431 6.4072 1.9480 4,770.2172 4,770.2172 0.9961 0.0272 4,803.2109

1.8421 1.5350 15,764.211
0 2023 39.6991 22.5391 28.4359 0.0505 0.7907 1.0531 1.8438 0.2115 0.9935 1.2049 0.0000

1.2761 3.1776 0.0000 15,263.959
0 15,263.959
0 2022 4.2611 50.9204 32.1392 0.1484 5.0749 1.3431 6.4072 1.9480 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.8421 1.5350 15,764.211
0 Mitigated Construction

1.2761 5.2384 0.0000 15,263.959
0 15,263.959
0 Maximum 39.6991 50.9204 32.1392 0.1484 9.8930 1.3431 11.2253 4.0089 4,770.2172 4,770.2172 0.9961 0.0272 4,803.2109

1.8421 1.5350 15,764.211
0 2023 39.6991 22.5391 28.4359 0.0505 0.8575 1.0531 1.9106 0.2279 0.9935 1.2213 0.0000

1.2761 5.2384 0.0000 15,263.959
0 15,263.959
0 2022 4.2611 50.9204 32.1392 0.1484 9.8930 1.3431 11.2253 4.0089 N2O CO2e
Year lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.1 Overall Construction (Maximum Daily Emission)Unmitigated Construction ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2 5
Exhaust
PM2 5
tblWater OutdoorWaterUseRate 260,137.92 249,696.08

2.0 Emissions Summary
tblWater IndoorWaterUseRate 424,435.55 407,398.87tblWater OutdoorWaterUseRate 616,595.89 489,361.82 tblTripsAndVMT WorkerTripNumber 300.00 60.00
tblWater IndoorWaterUseRate 1,006,024.88 798,432.44
tblTripsAndVMT VendorTripNumber 73.00 3.00tblTripsAndVMT WorkerTripNumber 60.00 12.00tblTripsAndVMT VendorTripNumber 0.00 4.00tblTripsAndVMT VendorTripNumber 0.00 6.00tblTripsAndVMT VendorTripNumber 0.00 2.00tblTripsAndVMT VendorTripNumber 0.00 2.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Acres of Grading (Site Preparation Phase): 9
Acres of Grading (Grading Phase): 60Acres of Paving: 1.86010101010101 Residential Indoor: 561,391; Residential Outdoor: 187,130; Non-Residential Indoor: 293,595; Non-Residential Outdoor: 97,865; Striped Parking Area:
5 19 j
11 Architectural Coating Architectural Coating 11/7/2023 12/1/2023 5 19 k10 Paving Paving 10/11/2023 11/6/2023 5 20 h
9 Building Construction Building Construction 5/12/2022 12/1/2023 5 407 i8 Fine Grading Soil Haul Grading 5/12/2022 6/8/2022 5 60 f
7 Fine Grading Grading 5/12/2022 6/8/2022 5 20 g6 Utility Trenching Trenching 4/14/2022 7/6/2022 5 30 d
5 Rough Grading Soil Haul Grading 3/29/2022 4/13/2022 5 12 e4 Rough Grading Grading 3/3/2022 4/13/2022 5 5b
3 Site Preparation Site Preparation 2/23/2022 3/2/2022 5 6 c2 Asphalt Demolition Debris Haul Demolition 2/16/2022 2/22/2022 Num Days
Week
Num Days Phase Description
1 Asphalt Demolition Demolition 1/1/2022 2/22/2022 5 37 a Phase
Number
Phase Name Phase Type Start Date End Date

3.0 Construction DetailConstruction Phase

0.00 0.00 0.00 0.00 0.00
Total CO2 CH4 N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 45.44 0.00 37.19 49.03 0.00 32.16 0.00 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied Fine Grading Tractors/Loaders/Backhoes 1 8.00 225 0.37

0.43 Fine Grading Rubber Tired Dozers 0 8.00 247 0.40Fine Grading Plate Compactors 5 8.00 7

0.50 Fine Grading Graders 0 8.00 187 0.41Utility Trenching Trenchers 1 8.00 50

0.43 Utility Trenching Tractors/Loaders/Backhoes 1 8.00 225 0.37Utility Trenching Plate Compactors 5 8.00 7

0.37 Utility Trenching Excavators 1 6.00 249 0.38Rough Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97

0.41 Rough Grading Soil Haul Rubber Tired Dozers 0 8.00 247 0.40Rough Grading Soil Haul Graders 0 8.00 187

0.48 Rough Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37Rough Grading Scrapers 1 8.00 367

0.38 Rough Grading Rubber Tired Dozers 1 8.00 247 0.40Rough Grading Rollers 1 8.00 134

0.38 Rough Grading Graders 1 8.00 187 0.41Rough Grading Excavators 1 8.00 270

0.48 Site Preparation Tractors/Loaders/Backhoes 1 7.00 276 0.37Site Preparation Scrapers 1 8.00 367

0.37 Site Preparation Graders 1 8.00 187 0.41Asphalt Demolition Debris Haul Tractors/Loaders/Backhoes 0 8.00 97

0.73 Asphalt Demolition Debris Haul Rubber Tired Dozers 0 8.00 247 0.40Asphalt Demolition Debris Haul Concrete/Industrial Saws 0 8.00 81

0.40 Asphalt Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37Asphalt Demolition Rubber Tired Dozers 1 8.00 247 Load Factor
Asphalt Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase Name Offroad Equipment Type Amount Usage Hours Horse Power OffRoad Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied HHDT
Architectural Coating 1 12.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTPaving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Building Construction 8 60.00 3.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTFine Grading Soil Haul 0 0.00 0.00 2,858.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT
Fine Grading 6 15.00 6.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTUtility Trenching 8 20.00 4.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Rough Grading Soil
Haul
0 0.00 0.00 1,058.00 14.70 6.90 19.00 LD_Mix HDT_Mix HHDT Rough Grading 7 18.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Site Preparation 3 8.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDTAsphalt Demolition 14.70 6.90 19.00 LD_Mix HDT_Mix Debris Haul
0 0.00 0.00 184.00
Hauling
Vehicle Class
Asphalt Demolition 5 13.00 2.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

0.48 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor Vehicle
Class
Architectural Coating Air Compressors 1 6.00 78

0.38 Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37Paving Rollers 2 8.00 80

0.42 Paving Paving Equipment 1 8.00 132 0.36Paving Pavers 1 8.00 130

0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56Building Construction Welders 3 8.00 46

0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37Building Construction Generator Sets 1 8.00 84

0.29 Building Construction Forklifts 2 7.00 89 0.20Building Construction Cranes 1 8.00 231

0.40 Fine Grading Soil Haul Tractors/Loaders/Backhoes 0 7.00 97 0.37Fine Grading Soil Haul Rubber Tired Dozers 0 8.00 247Fine Grading Soil Haul Graders 0 8.00 187 0.41 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 169.3525 169.3525 5.1000e003 9.5500e- 003 172.3259

3.7000e003 3.4800e- 003 128.3729
Total 0.0520 0.1383 0.5045 1.6500e003 0.1581 1.8700e- 003 0.1600 0.0422 1.7600e- 003 0.0440

8.6000e004 1.2600e- 0.0394 127.2444 127.2444 003 0.1453 9.3000e- 004 Worker 0.0482 0.0363 0.4698 0.1462 0.0385

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0128 9.4000e- 004 0.0138 3.6900e-003 9.0000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.2 Asphalt Demolition - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

3.1 Mitigation Measures ConstructionReplace Ground CoverWater Exposed AreaReduce Vehicle Speed on Unpaved RoadsClean Paved Roads CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 169.3525 169.3525 5.1000e003 9.5500e- 003 172.3259

3.7000e003 3.4800e- 003 128.3729
Total 0.0520 0.1383 0.5045 1.6500e003 0.1459 1.8700e- 003 0.1478 0.0392 1.7600e- 003 0.0410

8.6000e004 1.2600e- 0.0366 127.2444 127.2444 003 0.1339 9.3000e- 004 Worker 0.0482 0.0363 0.4698 0.1349 0.0358

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0120 9.4000e- 004 0.0129 3.4900e-003 9.0000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,323.4168 2,323.4168 0.5921 2,338.2191

0.5921 2,338.2191
Total 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 Off-Road 1.6889 16.6217 13.9605 0.0241 0.8379 0.8379 0.7829 0.7829 0.0000 2,323.4168 2,323.4168 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,386.1241 2,386.1241 0.1263 0.3786 2,502.1048

0.0000 0.0000 0.0000
Total 0.1608 6.1465 1.4198 0.0218 0.6120 0.0437 0.6557 0.1678 0.0419 0.2096 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1263 0.3786 2,502.1048
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1608 6.1465 1.4198 0.0218 0.6120 0.0437 0.6557 0.1678 0.0419 0.2096 2,386.1241 2,386.1241 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 7.8706 0.0000 7.8706 1.1917 0.0000 1.1917 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.3 Asphalt Demolition Debris Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 2,386.1241 2,386.1241 0.1263 0.3786 2,502.1048

0.0000 0.0000 0.0000
Total 0.1608 6.1465 1.4198 0.0218 0.5704 0.0437 0.6141 0.1576 0.0419 0.1994 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.1263 0.3786 2,502.1048
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.1608 6.1465 1.4198 0.0218 0.5704 0.0437 0.6141 0.1576 0.0419 0.1994 2,386.1241 2,386.1241 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 3.3647 0.0000 3.3647 0.5094 0.0000 0.5094 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.4124 120.4124 3.6800e003 8.2100e- 003 122.9517

2.2800e003 2.1400e- 003 78.9987
Total 0.0335 0.1243 0.3238 1.1600e003 0.1022 1.5100e- 003 0.1037 0.0274 1.4300e- 003 0.0288

5.3000e004 7.7000e- 0.0242 78.3043 78.3043 004 0.0894 5.7000e- 004 Worker 0.0296 0.0223 0.2891 0.0900 0.0237

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0128 9.4000e- 004 0.0138 3.6900e-003 9.0000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Unmitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 1.5908 0.5998 2.1905 0.1718 0.5518 0.7236 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 Fugitive Dust 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.4 Site Preparation - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 120.4124 120.4124 3.6800e003 8.2100e- 003 122.9517

2.2800e003 2.1400e- 003 78.9987
Total 0.0335 0.1243 0.3238 1.1600e003 0.0944 1.5100e- 003 0.0959 0.0255 1.4300e- 003 0.0269

5.3000e004 7.7000e- 0.0225 78.3043 78.3043 004 0.0824 5.7000e- 004 Worker 0.0296 0.0223 0.2891 0.0830 0.0220

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0120 9.4000e- 004 0.0129 3.4900e-003 9.0000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.9221 2,874.1509
Mitigated Construction Off-Site
Total 1.4869 16.4656 10.1152 0.0295 0.6801 0.5998 1.2798 0.0734 0.5518 0.6252 0.0000 2,851.0984 2,851.0984 2,851.0984 2,851.0984 0.9221 2,874.1509

0.0000
Off-Road 1.4869 16.4656 10.1152 0.0295 0.5998 0.5998 0.5518 0.5518 0.0000 Fugitive Dust 0.6801 0.0000 0.6801 0.0734 0.0000 0.0734 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 218.2927 218.2927 6.5300e003 0.0109 221.7001

5.1300e003 4.8100e- 003 177.7470
Total 0.0706 0.1523 0.6852 2.1300e003 0.2140 2.2300e- 003 0.2162 0.0571 2.0900e- 003 0.0591

1.1900e003 1.7400e- 0.0545 176.1846 176.1846 003 0.2012 1.2900e- 003 Worker 0.0667 0.0502 0.6505 0.2025 0.0534

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0128 9.4000e- 004 0.0138 3.6900e-003 9.0000e- 004 4.5800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Unmitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 8.1431 1.2253 9.3684 3.5393 1.1272 4.6665 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 Fugitive Dust 8.1431 0.0000 8.1431 3.5393 0.0000 3.5393 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.5 Rough Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 218.2927 218.2927 6.5300e003 0.0109 221.7001

5.1300e003 4.8100e- 003 177.7470
Total 0.0706 0.1523 0.6852 2.1300e003 0.1975 2.2300e- 003 0.1997 0.0530 2.0900e- 003 0.0551

1.1900e003 1.7400e- 0.0507 176.1846 176.1846 003 0.1855 1.2900e- 003 Worker 0.0667 0.0502 0.6505 0.1867 0.0495

42.1081 42.1081 1.4000e003 6.0700e- 003 43.9531

0.0000 0.0000 0.0000
Vendor 3.8900e003 0.1020 0.0348 3.9000e- 004 0.0120 9.4000e- 004 0.0129 3.4900e-003 9.0000e- 004 4.3800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

1.5329 4,777.9092
Mitigated Construction Off-Site
Total 2.7387 29.3482 20.1327 0.0490 3.4812 1.2253 4.7064 1.5130 1.1272 2.6403 0.0000 4,739.5873 4,739.5873 4,739.5873 4,739.5873 1.5329 4,777.9092

0.0000
Off-Road 2.7387 29.3482 20.1327 0.0490 1.2253 1.2253 1.1272 1.1272 0.0000 Fugitive Dust 3.4812 0.0000 3.4812 1.5130 0.0000 1.5130 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,716.7557 5,716.7557 0.3027 0.9071 5,994.6261

0.0000 0.0000 0.0000
Total 0.3851 14.7260 3.4016 0.0522 1.4662 0.1048 1.5710 0.4020 0.1003 0.5023 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3027 0.9071 5,994.6261
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3851 14.7260 3.4016 0.0522 1.4662 0.1048 1.5710 0.4020 0.1003 0.5023 5,716.7557 5,716.7557 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0697 0.0000 0.0697 0.0106 0.0000 0.0106 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.6 Rough Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 5,716.7557 5,716.7557 0.3027 0.9071 5,994.6261

0.0000 0.0000 0.0000
Total 0.3851 14.7260 3.4016 0.0522 1.3665 0.1048 1.4713 0.3775 0.1003 0.4778 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.3027 0.9071 5,994.6261
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.3851 14.7260 3.4016 0.0522 1.3665 0.1048 1.4713 0.3775 0.1003 0.4778 5,716.7557 5,716.7557 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0298 0.0000 0.0298 4.5100e-003 0.0000 4.5100e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 279.9769 279.9769 8.5000e003 0.0175 285.4028

5.7000e003 5.3500e- 003 197.4967
Total 0.0819 0.2598 0.7922 2.7200e003 0.2492 3.3000e- 003 0.2525 0.0667 3.1100e- 003 0.0698

1.3200e003 1.9400e- 0.0606 195.7606 195.7606 003 0.2236 1.4300e- 003 Worker 0.0741 0.0558 0.7227 0.2250 0.0593

84.2163 84.2163 2.8000e003 0.0122 87.9061

0.0000 0.0000 0.0000
Vendor 7.7800e003 0.2040 0.0695 7.8000e- 004 0.0256 1.8700e- 003 0.0275 7.3800e-003 1.7900e- 003 9.1700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.7 Utility Trenching - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 279.9769 279.9769 8.5000e003 0.0175 285.4028

5.7000e003 5.3500e- 003 197.4967
Total 0.0819 0.2598 0.7922 2.7200e003 0.2300 3.3000e- 003 0.2333 0.0620 3.1100e- 003 0.0651

1.3200e003 1.9400e- 0.0563 195.7606 195.7606 003 0.2061 1.4300e- 003 Worker 0.0741 0.0558 0.7227 0.2075 0.0550

84.2163 84.2163 2.8000e003 0.0122 87.9061

0.0000 0.0000 0.0000
Vendor 7.7800e003 0.2040 0.0695 7.8000e- 004 0.0240 1.8700e- 003 0.0259 6.9700e-003 1.7900e- 003 8.7700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
1,664.3091 1,664.3091 0.5051 1,676.9377

0.5051 1,676.9377
Total 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 Off-Road 0.9542 7.5687 5.9861 0.0178 0.3170 0.3170 0.2951 0.2951 0.0000 1,664.3091 1,664.3091 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 273.1449 273.1449 8.4800e003 0.0222 279.9817

4.2700e003 4.0100e- 003 148.1225
Total 0.0672 0.3479 0.6463 2.6300e003 0.2061 3.8800e- 003 0.2100 0.0555 3.6800e- 003 0.0592

9.9000e004 1.4500e- 0.0455 146.8205 146.8205 003 0.1677 1.0700e- 003 Worker 0.0556 0.0419 0.5421 0.1687 0.0445 126.3244 126.3244 4.2100e003 0.0182 131.8592

0.0000 0.0000 0.0000
Vendor 0.0117 0.3060 0.1043 1.1800e003 0.0384 2.8100e- 003 0.0412 0.0111 2.6900e- 003 0.0138 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Unmitigated Construction Off-Site

9.2600e- 0.1333 0.1333 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.8 Fine Grading - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 273.1449 273.1449 8.4800e003 0.0222 279.9817

4.2700e003 4.0100e- 003 148.1225
Total 0.0672 0.3479 0.6463 2.6300e003 0.1905 3.8800e- 003 0.1944 0.0517 3.6800e- 003 0.0554

9.9000e004 1.4500e- 0.0422 146.8205 146.8205 003 0.1546 1.0700e- 003 Worker 0.0556 0.0419 0.5421 0.1556 0.0413 126.3244 126.3244 4.2100e003 0.0182 131.8592

0.0000 0.0000 0.0000
Vendor 0.0117 0.3060 0.1043 1.1800e003 0.0360 2.8100e- 003 0.0388 0.0105 2.6900e- 003 0.0132 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.2389 847.0925
Mitigated Construction Off-Site

9.2600e- 0.1333 0.1333 0.0000 841.1197 841.1197
003
Total 0.4500 3.9516 2.6276 0.0000 0.1412 0.1412 0.0000
841.1197 841.1197 0.2389 847.0925

0.0000
Off-Road 0.4500 3.9516 2.6276 9.2600e003 0.1412 0.1412 0.1333 0.1333 0.0000 Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,265.6831 9,265.6831 0.4906 1.4702 9,716.0537

0.0000 0.0000 0.0000
Total 0.6242 23.8679 5.5133 0.0846 2.3764 0.1699 2.5462 0.6515 0.1625 0.8141 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4906 1.4702 9,716.0537
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6242 23.8679 5.5133 0.0846 2.3764 0.1699 2.5462 0.6515 0.1625 0.8141 9,265.6831 9,265.6831 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Unmitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.1131 0.0000 0.1131 0.0171 0.0000 0.0171 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.9 Fine Grading Soil Haul - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 9,265.6831 9,265.6831 0.4906 1.4702 9,716.0537

0.0000 0.0000 0.0000
Total 0.6242 23.8679 5.5133 0.0846 2.2148 0.1699 2.3847 0.6119 0.1625 0.7744 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.4906 1.4702 9,716.0537
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.6242 23.8679 5.5133 0.0846 2.2148 0.1699 2.3847 0.6119 0.1625 0.7744 9,265.6831 9,265.6831 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0000 0.0000
Mitigated Construction Off-Site
Total 0.0000 0.0000 0.0000 0.0000 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Fugitive Dust 0.0484 0.0000 0.0484 7.3200e-003 0.0000 7.3200e-003 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 650.4441 650.4441 0.0192 0.0252 658.4197

0.0171 0.0160 592.4901
Total 0.2281 0.3205 2.2203 6.4000e003 0.6899 5.6900e- 003 0.6956 0.1834 5.2900e- 003 0.1887

3.9500e003 5.8100e- 0.1818 587.2819 587.2819 003 0.6707 4.2900e- 003 Worker 0.2222 0.1675 2.1682 0.6750 0.1779

63.1622 63.1622 2.1000e003 9.1100e- 003 65.9296

0.0000 0.0000 0.0000
Vendor 5.8300e003 0.1530 0.0521 5.9000e- 004 0.0192 1.4000e- 003 0.0206 5.5300e-003 1.3400e- 003 6.8800e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2022Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 650.4441 650.4441 0.0192 0.0252 658.4197

0.0171 0.0160 592.4901
Total 0.2281 0.3205 2.2203 6.4000e003 0.6362 5.6900e- 003 0.6419 0.1702 5.2900e- 003 0.1755

3.9500e003 5.8100e- 0.1689 587.2819 587.2819 003 0.6182 4.2900e- 003 Worker 0.2222 0.1675 2.1682 0.6225 0.1650

63.1622 63.1622 2.1000e003 9.1100e- 003 65.9296

0.0000 0.0000 0.0000
Vendor 5.8300e003 0.1530 0.0521 5.9000e- 004 0.0180 1.4000e- 003 0.0194 5.2300e-003 1.3400e- 003 6.5700e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.2813 2,289.2813 0.4417 2,300.3230

0.4417 2,300.3230
Total 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 Off-Road 1.8555 14.6040 14.3533 0.0250 0.7022 0.7022 0.6731 0.6731 0.0000 2,289.2813 2,289.2813 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 628.5983 628.5983 0.0173 0.0235 636.0208

0.0153 0.0148 573.2034
Total 0.2096 0.2684 2.0391 6.1800e003 0.6899 4.6100e- 003 0.6945 0.1834 4.2700e- 003 0.1877

3.7100e003 5.6200e- 0.1816 568.4122 568.4122 003 0.6707 4.0300e- 003 Worker 0.2063 0.1479 1.9931 0.6747 0.1779

60.1861 60.1861 2.0000e003 8.6600e- 003 62.8173

0.0000 0.0000 0.0000
Vendor 3.3400e003 0.1206 0.0460 5.6000e- 004 0.0192 5.8000e- 004 0.0198 5.5300e-003 5.6000e- 004 6.0900e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.10 Building Construction - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 628.5983 628.5983 0.0173 0.0235 636.0208

0.0153 0.0148 573.2034
Total 0.2096 0.2684 2.0391 6.1800e003 0.6362 4.6100e- 003 0.6408 0.1702 4.2700e- 003 0.1745

3.7100e003 5.6200e- 0.1687 568.4122 568.4122 003 0.6182 4.0300e- 003 Worker 0.2063 0.1479 1.9931 0.6222 0.1650

60.1861 60.1861 2.0000e003 8.6600e- 003 62.8173

0.0000 0.0000 0.0000
Vendor 3.3400e003 0.1206 0.0460 5.6000e- 004 0.0180 5.8000e- 004 0.0186 5.2300e-003 5.6000e- 004 5.7900e-003 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,289.5233 2,289.5233 0.4330 2,300.3479

0.4330 2,300.3479
Total 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 Off-Road 1.7136 13.6239 14.2145 0.0250 0.6136 0.6136 0.5880 0.5880 0.0000 2,289.5233 2,289.5233 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 142.1030 142.1030 3.8300e003 3.7000e- 003 143.3009

3.8300e003 3.7000e- 003 143.3009
Total 0.0516 0.0370 0.4983 1.4100e003 0.1677 1.0100e- 003 0.1687 0.0445 9.3000e- 004 0.0454

9.3000e004 1.4100e- 0.0454 142.1030 142.1030 003 0.1677 1.0100e- 003 Worker 0.0516 0.0370 0.4983 0.1687 0.0445

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Unmitigated Construction Off-Site
Total 1.0227 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1425 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.11 Paving - 2023Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 142.1030 142.1030 3.8300e003 3.7000e- 003 143.3009

3.8300e003 3.7000e- 003 143.3009
Total 0.0516 0.0370 0.4983 1.4100e003 0.1546 1.0100e- 003 0.1556 0.0413 9.3000e- 004 0.0422

9.3000e004 1.4100e- 0.0422 142.1030 142.1030 003 0.1546 1.0100e- 003 Worker 0.0516 0.0370 0.4983 0.1556 0.0413

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.5420 1,723.5414
Mitigated Construction Off-Site
Total 1.0227 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926

0.0000 0.0000

0.5420 1,723.5414
Paving 0.1425 0.0000 0.0000 0.0000 0.0000
Off-Road 0.8802 8.6098 11.6840 0.0179 0.4338 0.4338 0.4003 0.4003 0.0000 1,709.9926 1,709.9926 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 113.6824 113.6824 3.0700e003 2.9600e- 003 114.6407

3.0700e003 2.9600e- 003 114.6407
Total 0.0413 0.0296 0.3986 1.1200e003 0.1341 8.1000e- 004 0.1349 0.0356 7.4000e- 004 0.0363

7.4000e004 1.1200e- 0.0363 113.6824 113.6824 003 0.1341 8.1000e- 004 Worker 0.0413 0.0296 0.3986 0.1349 0.0356

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Unmitigated Construction Off-Site

2.9700e- 0.0708 0.0708 281.4481 281.4481
003
Total 37.7346 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 Archit. Coating 37.5429 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

3.12 Architectural Coating - 2023Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 7/5/2022 2:19 PM
Washington and Rosemead Mixed-Use Project Mitigated Construction Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied 113.6824 113.6824 3.0700e003 2.9600e- 003 114.6407

3.0700e003 2.9600e- 003 114.6407
Total 0.0413 0.0296 0.3986 1.1200e003 0.1236 8.1000e- 004 0.1244 0.0330 7.4000e- 004 0.0337

7.4000e004 1.1200e- 0.0337 113.6824 113.6824 003 0.1236 8.1000e- 004 Worker 0.0413 0.0296 0.3986 0.1244 0.0330

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0168 281.8690
Mitigated Construction Off-Site

2.9700e- 0.0708 0.0708 0.0000 281.4481 281.4481
003
Total 37.7346 1.3030 1.8111 0.0708 0.0708
281.4481 281.4481 0.0168 281.8690

0.0000
Off-Road 0.1917 1.3030 1.8111 2.9700e003 0.0708 0.0708 0.0708 0.0708 0.0000 Archit. Coating 37.5429 0.0000 0.0000 0.0000 0.0000 0.0000 N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Operations Model

Vehicle Trips - residential VMT provided by LLG, no trips associated with the swimming pool, assuming sat/sun trips are the same as weekday trips Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors -

0.004

1.3 User Entered Comments & Non-Default Data
Project Characteristics - Land Use - based on data provided by the applicantConstruction Phase - CO2 Intensity (lb/MWhr)
683.98 CH4 Intensity
(lb/MWhr)

0.033 N2O Intensity
(lb/MWhr)
Climate Zone 9 Operational Year 2023
Utility Company Pico Rivera Innovative Municipal Energy 0 1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 33 Regional Shopping Center 2.87 1000sqft 0.00 2,865.00
0 Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 729 Recreational Swimming Pool 17.50 1000sqft 0.00 17,500.00 0 High Turnover (Sit Down Restaurant) 2.87 1000sqft 0.00 2,865.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed Use Project Operations Run Los Angeles-South Coast County, Annual

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblFleetMix SBUS 6.9800e-004 1.3500e-004tblFleetMix MHD 0.01 2.0250e-003tblFleetMix OBUS 9.2500e-004 0.00tblFleetMix MDV 0.13 0.02tblFleetMix MH 3.3740e-003 6.5200e-004tblFleetMix LHD2 6.0830e-003 1.1760e-003tblFleetMix MCY 0.02 0.03tblFleetMix LDT2 0.19 0.22tblFleetMix LHD1 0.02 4.4630e-003tblFleetMix LDA 0.54 0.64tblFleetMix LDT1 0.06 0.07 tblFireplaces NumberWood 12.75 0.00
tblFleetMix HHD 8.0120e-003 1.5490e-003
tblFireplaces NumberGas 216.75 3.00tblFireplaces NumberNoFireplace 25.50 252.00tblFireplaces FireplaceDayYear 25.00 104.00tblFireplaces FireplaceWoodMass 1,019.20 0.00 tblAreaCoating Area_Residential_Exterior 175649 187461tblAreaCoating Area_Residential_Interior 526946 562383tblAreaCoating Area_Nonresidential_Interior 34845 293595tblAreaCoating Area_Parking 15360 11400 Table Name Column Name Default Value New Value
tblAreaCoating Area_Nonresidential_Exterior 11615 97865 Area Coating - residential area includes swimming pool, non-residential includes coating of the parking structureEnergy Use - Water And Wastewater - Assumes 100% aerobic treatment.Water Mitigation - Fleet Mix - see fleet mix adjustment for apartments in assumptions fileWoodstoves - assumes 3 barbecue grills operating for 3 hours each on weekends CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblVehicleTrips ST_TR 46.12 39.27tblVehicleTrips SU_TR 4.09 4.57tblVehicleTrips ST_TR 122.40 110.47tblVehicleTrips ST_TR 9.10 0.00tblVehicleTrips PR_TP 54.00 100.00tblVehicleTrips ST_TR 4.91 4.57tblVehicleTrips PR_TP 86.00 100.00tblVehicleTrips PR_TP 37.00 100.00tblVehicleTrips PB_TP 43.00 0.00tblVehicleTrips PB_TP 11.00 0.00tblVehicleTrips HW_TL 14.70 10.08tblVehicleTrips PB_TP 3.00 0.00tblVehicleTrips HO_TL 8.70 10.08tblVehicleTrips HS_TL 5.90 10.08tblVehicleTrips DV_TP 20.00 0.00tblVehicleTrips DV_TP 35.00 0.00 tblSolidWaste SolidWasteGenerationRate 3.01 2.89
tblVehicleTrips DV_TP 11.00 0.00
tblSolidWaste SolidWasteGenerationRate 34.15 32.73tblSolidWaste SolidWasteGenerationRate 99.75 76.95 tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 0.07 0.00tblLandUse LotAcreage 0.07 0.00tblLandUse LotAcreage 0.40 0.00tblLandUse LandUseSquareFeet 2,870.00 2,865.00tblLandUse LotAcreage 4.36 0.34tblLandUse LandUseSquareFeet 2,870.00 2,865.00tblLandUse LandUseSquareFeet 255,000.00 260,220.00 tblFleetMix UBUS 6.1100e-004 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblWoodstoves WoodstoveWoodMass 999.60 0.00tblWoodstoves NumberNoncatalytic 12.75 0.00tblWoodstoves WoodstoveDayYear 25.00 0.00 tblWater SepticTankPercent 10.33 0.00
tblWoodstoves NumberCatalytic 12.75 0.00
tblWater SepticTankPercent 10.33 0.00tblWater SepticTankPercent 10.33 0.00tblWater OutdoorWaterUseRate 130,295.95 124,848.04tblWater SepticTankPercent 10.33 0.00tblWater OutdoorWaterUseRate 55,604.79 53,279.85tblWater OutdoorWaterUseRate 634,357.92 489,361.82tblWater IndoorWaterUseRate 1,035,005.02 798,432.44tblWater IndoorWaterUseRate 212,588.14 203,699.43tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater IndoorWaterUseRate 871,141.75 834,717.71tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AerobicPercent 87.46 100.00tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AerobicPercent 87.46 100.00tblWater AerobicPercent 87.46 100.00 tblVehicleTrips WD_TR 37.75 39.27
tblWater AerobicPercent 87.46 100.00
tblVehicleTrips WD_TR 112.18 110.47tblVehicleTrips WD_TR 28.82 0.00tblVehicleTrips SU_TR 21.10 39.27tblVehicleTrips WD_TR 5.44 4.57tblVehicleTrips SU_TR 142.64 110.47tblVehicleTrips SU_TR 13.60 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 2,742.5504 2,794.4344 2.9410 0.0856 2,893.4642

0.0226 0.0119 105.0298
Total 2.2703 1.0325 12.4841 0.0202 2.1191 0.0433 2.1624 0.5632 0.0422 0.6054 51.8840 Water 0.0000 0.0000 0.0000 0.0000 5.2224 95.6914 100.9139

0.0000 46.6615 2.7576 0.0000 115.6020

0.1199 0.0658 1,773.5962
Waste 0.0000 0.0000 0.0000 0.0000 46.6615
Mobile 0.9478 0.8135 9.7565 0.0188 2.1191 0.0136 2.1327 0.5632 0.0126 0.5758 0.0000 1,751.0031 1,751.0031 888.5564 888.5564 0.0367 7.8600e-003 891.8152

4.2100e003 5.0000e-005 7.4210
Energy 0.0216 0.1861 0.0927 1.1800e-003 0.0149 0.0149 0.0149 0.0149 0.0000 Area 1.3009 0.0329 2.6350 1.6000e-004 0.0148 0.0148 0.0148 0.0148 0.0000 7.2995 7.2995 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
2,759.8006 2,812.9902 2.9464 0.0885 2,913.0293

0.0279 0.0149 124.5950
Total 2.2703 1.0325 12.4841 0.0202 2.1191 0.0433 2.1624 0.5632 0.0422 0.6054 53.1896 Water 0.0000 0.0000 0.0000 0.0000 6.5280 112.9416 119.4697

0.0000 46.6615 2.7576 0.0000 115.6020

0.1199 0.0658 1,773.5962
Waste 0.0000 0.0000 0.0000 0.0000 46.6615
Mobile 0.9478 0.8135 9.7565 0.0188 2.1191 0.0136 2.1327 0.5632 0.0126 0.5758 0.0000 1,751.0031 1,751.0031 888.5564 888.5564 0.0367 7.8600e-003 891.8152

4.2100e003 5.0000e-005 7.4210
Energy 0.0216 0.1861 0.0927 1.1800e-003 0.0149 0.0149 0.0149 0.0149 0.0000 Area 1.3009 0.0329 2.6350 1.6000e-004 0.0148 0.0148 0.0148 0.0148 0.0000 7.2995 7.2995 N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

2.2 Overall Operational
Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

2.0 Emissions Summary
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total 1,595.10 1,595.10 1,595.10 5,680,513 5,680,513
Regional Shopping Center 112.70 112.70 112.70 387,748 387,748 Recreational Swimming Pool 0.00 0.00 0.00
Other Non-Asphalt Surfaces 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00
High Turnover (Sit Down Restaurant) 317.05 317.05 317.05 1,016,956 1,016,956 Enclosed Parking with Elevator 0.00 0.00 0.00
Annual VMT
Apartments Mid Rise 1,165.35 1,165.35 1165.35 4,275,809 4,275,809 Land Use Weekday Saturday Sunday Annual VMT

0.1199 0.0658 1,773.5962

4.2 Trip Summary Information
Average Daily Trip Rate Unmitigated Mitigated
1,773.5962
Unmitigated 0.9478 0.8135 9.7565 0.0188 2.1191 0.0136 2.1327 0.5632 0.0126 0.5758 0.0000 1,751.0031 1,751.0031

0.0000 1,751.0031 1,751.0031 0.1199 0.0658
CO2e
Category tons/yr MT/yr
Mitigated 0.9478 0.8135 9.7565 0.0188 2.1191 0.0136 2.1327 0.5632 0.0126 0.5758 Exhaust Bio- CO2 NBio- CO2 Total CO2 CH4 N2O
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total

4.0 Operational Detail - Mobile4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive
PM10

0.18 3.32 0.67
N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.45 0.63 0.66 PM2.5
Total
Fugitive Bio- CO2 NBio-CO2 Total CO2 CH4
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
ROG NOx CO SO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Regional Shopping Center 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000698 0.003374
Recreational Swimming Pool 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000611 0.024394 0.000698 0.003374
Other Non-Asphalt Surfaces 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 Other Asphalt Surfaces 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925

0.000698 0.003374
High Turnover (Sit Down
Restaurant)

0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000000 0.029705 0.000135 0.000652
Enclosed Parking with Elevator 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 Apartments Mid Rise 0.644264 0.074319 0.221712 0.020000 0.004463 0.001176 0.002025 0.001549 0.000000 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH

4.4 Fleet Mix
Land Use LDA LDT1 LDT2
Regional Shopping Center 16.60 8.40 6.90 16.30 64.70 19.00 100 0 0 Recreational Swimming Pool 16.60 8.40 6.90 33.00 48.00 19.00 52 39 9 Other Non-Asphalt Surfaces 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 High Turnover (Sit Down 72.50 19.00 100 0 0
R t t)

16.60 8.40 6.90 8.50
Enclosed Parking with Elevator 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Apartments Mid Rise 10.08 10.08 10.08 40.20 19.20 40.60 100 0 0 Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by

4.3 Trip Type Information
Miles Trip % Trip Purpose %
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

3.9100e003 0.0149 0.0000 213.2709 213.2709 4.0800e-003 214.5383

0.2492 0.0000 0.0000 0.2507
Total 0.0216 0.1861 0.0927 1.1700e-003 0.0149 0.0149 0.0149

2.0000e005 1.9000e-004 0.0000 2.0000e-005 2.0000e- 2.0000e-005 0.0000 0.2492 005 Regional Shopping Center 4669.95 3.0000e- 005 2.3000e-004

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000
Recreational
Swimming Pool
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces
0 0.0000 0.0000

35.2145 35.2145 6.7000e-004 6.5000e004 35.4238

0.0000 0.0000
High Turnover (Sit
Down Restaurant)
659895 3.5600e003 0.0324 0.0272 1.9000e-004 2.4600e-003 2.4600e- 003 2.4600e- 003 2.4600e-003 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000
177.8072 3.4100e-003 3.2600e003 178.8638
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Apartments Mid 0.0653 9.8000e-004 0.0124 0.0124 0.0124 0.0124 0.0000 177.8072 Rise

3.33198e+
006

0.0180 0.1535
CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2

5.2 Energy by Land Use - NaturalGas
Unmitigated
NaturalGas
Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
213.2709 213.2709 4.0900e003 3.9100e-003 214.5383

4.0900e003 3.9100e-003 214.5383
NaturalGas
Unmitigated

0.0216 0.1861 0.0927 1.1800e-003 0.0149 0.0149 0.0149 0.0149 0.0000 NaturalGas 1.1800e-003 0.0149 0.0149 0.0149 0.0149 0.0000 213.2709 213.2709 Mitigated

0.0216 0.1861 0.0927
675.2855 675.2855 0.0326 3.9500e-003 677.2769

0.0326 3.9500e-003 677.2769
Electricity
Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000
Electricity 0.0000 0.0000 0.0000 0.0000 0.0000 675.2855 675.2855 Mitigated
N2O CO2e
Category tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Historical Energy Use: N

5.1 Mitigation Measures Energy
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

5.0 Energy Detail
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total 675.2855 0.0326 3.9500e-003 677.2769

0.0000 0.0000
Regional Shopping
Center
37445.6 11.6174 5.6000e-004 7.0000e-005 11.6517
Recreational
Swimming Pool
0 0.0000 0.0000

0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000

1.8800e-003 321.6181
High Turnover (Sit
Down Restaurant)
123969 38.4610 1.8600e-003 2.2000e-004 38.5744
Enclosed Parking
with Elevator

1.0336e+0
06 320.6725 0.0155
Land Use kWh/yr t
o
MT/yr
Apartments Mid
Rise
981584 304.5347 0.0147 1.7800e-003 305.4327

3.9100e003 214.5383

5.3 Energy by Land Use - Electricity
Unmitigated
Electricity
Use
Total CO2 CH4 N2O CO2e

0.0149 0.0000 213.2709 213.2709 4.0800e-003

0.2492 0.0000 0.0000 0.2507
Total 0.0216 0.1861 0.0927 1.1700e-003 0.0149 0.0149 0.0149

2.0000e005 1.9000e-004 0.0000 2.0000e-005 2.0000e- 2.0000e-005 0.0000 0.2492 005 Regional Shopping Center 4669.95 3.0000e- 005 2.3000e-004

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000
Recreational
Swimming Pool
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces
0 0.0000 0.0000

35.2145 35.2145 6.7000e-004 6.5000e004 35.4238

0.0000 0.0000
High Turnover (Sit
Down Restaurant)
659895 3.5600e003 0.0324 0.0272 1.9000e-004 2.4600e-003 2.4600e- 003 2.4600e- 003 2.4600e-003 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000
177.8072 3.4100e-003 3.2600e003 178.8638
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Apartments Mid 0.0653 9.8000e-004 0.0124 0.0124 0.0124 0.0124 0.0000 177.8072 Rise

3.33198e+
006

0.0180 0.1535
N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated
NaturalGas
Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

4.2100e003 5.0000e-005 7.4210

7.4210
Unmitigated 1.3009 0.0329 2.6350 1.6000e-004 0.0148 0.0148 0.0148 0.0148 0.0000 7.2995 7.2995

0.0000 7.2995 7.2995 4.2100e003 5.0000e-005
CO2e
Category tons/yr MT/yr
Mitigated 1.3009 0.0329 2.6350 1.6000e-004 0.0148 0.0148 0.0148 0.0148 Exhaust Bio- CO2 NBio- CO2 Total CO2 CH4 N2O
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total

3.9500e-003 677.2769

6.0 Area Detail6.1 Mitigation Measures Area
ROG NOx CO SO2 Fugitive
PM10
Total 675.2855 0.0326

0.0000 0.0000
Regional Shopping
Center
37445.6 11.6174 5.6000e-004 7.0000e-005 11.6517
Recreational
Swimming Pool
0 0.0000 0.0000

0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000

1.8800e-003 321.6181
High Turnover (Sit
Down Restaurant)
123969 38.4610 1.8600e-003 2.2000e-004 38.5744
Enclosed Parking
with Elevator

1.0336e+0
06 320.6725 0.0155
Land Use kWh/yr t
on
MT/yr
Apartments Mid
Rise
981584 304.5347 0.0147 1.7800e-003 305.4327
Mitigated
Electricity
Use
Total CO2 CH4 N2O CO2e
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

4.2100e003 Total 1.3009 0.0329 2.6350 1.6000e-004 0.0148 0.0148 0.0148 0.0148 0.0000 7.2995 7.2995 5.0000e-005 7.4210

4.3025 4.3025 4.1500e003 0.0000 4.4063

6.0000e005 5.0000e-005 3.0147
Landscaping 0.0796 0.0304 2.6339 1.4000e-004 0.0146 0.0146 0.0146 0.0146 0.0000

2.1000e004 2.0000e-005 2.1000e- 2.1000e-004 0.0000 2.9969 2.9969 004 Hearth 3.0000e- 2.1000e-004 004 2.5900e-003 1.1000e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Consumer
Products

1.0408 0.0000 0.0000 0.0000 0.0000 0.0000
Architectural 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating

0.1803
CH4 N2O CO2e
SubCategory tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

4.2100e003 5.0000e-005 7.4210
Mitigated
Total 1.3009 0.0329 2.6350 1.6000e-004 0.0148 0.0148 0.0148 0.0148 0.0000 7.2995 7.2995

4.3025 4.3025 4.1500e003 0.0000 4.4063

6.0000e005 5.0000e-005 3.0147
Landscaping 0.0796 0.0304 2.6339 1.4000e-004 0.0146 0.0146 0.0146 0.0146 0.0000

2.1000e004 2.0000e-005 2.1000e- 2.1000e-004 0.0000 2.9969 2.9969 004 Hearth 3.0000e- 2.1000e-004 004 2.5900e-003 1.1000e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000
Consumer
Products

1.0408 0.0000 0.0000 0.0000 0.0000 0.0000
Architectural 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating

0.1803
CH4 N2O CO2e
SubCategory tons/yr MT/yr
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

6.2 Area by SubCategory
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total 119.4697 0.0279 0.0149 124.5950

6.4000e-004 5.4166
Regional Shopping
Center

0.203699 /

0.124848

1.3253 3.1000e-004 1.6000e-004 1.3819
Recreational
Swimming Pool

0.798432 /

0.489362

5.1947 1.2100e-003

0.0000 0.0000
Other Non-Asphalt
Surfaces
0 / 0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 / 0 0.0000 0.0000

0.0000 0.0000
High Turnover (Sit
Down Restaurant)

0.834718 / 0.0532798

3.8510 1.1900e-003 6.6000e-004 4.0783
Enclosed Parking
with Elevator
0 / 0 0.0000 0.0000
Land Use Mgal t
o
MT/yr
Apartments Mid
Rise

16.6143 /

10.4742
109.0987 0.0252 0.0134 113.7182
124.5950

7.2 Water by Land Use
Unmitigated
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Unmitigated 119.4697 0.0279 0.0149
CO2e
Category t
o
MT/yr
Mitigated 100.9139 0.0226 0.0119 105.0298
Total CO2 CH4 N2O
Install Low Flow Bathroom FaucetInstall Low Flow Kitchen FaucetInstall Low Flow ToiletInstall Low Flow ShowerUse Water Efficient Irrigation System

7.0 Water Detail7.1 Mitigation Measures Water
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Unmitigated 46.6615 2.7576 0.0000 115.6020
CO2e
ton
MT/yr
Mitigated 46.6615 2.7576 0.0000 115.6020
Total CO2 CH4 N2O

0.0119 105.0298

8.0 Waste Detail8.1 Mitigation Measures Waste
Category/Year
Total 100.9139 0.0226

5.2000e-004 4.5684
Regional Shopping
Center

0.16296 / 0.117232

1.1201 2.5000e-004 1.3000e-004 1.1655
Recreational
Swimming Pool

0.638746 /

0.459511

4.3902 9.8000e-004

0.0000 0.0000
Other Non-Asphalt
Surfaces
0 / 0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 / 0 0.0000 0.0000

0.0000 0.0000
High Turnover (Sit
Down Restaurant)

0.667774 / 0.0500298

3.1063 9.5000e-004 5.3000e-004 3.2882
Enclosed Parking
with Elevator
0 / 0 0.0000 0.0000
Land Use Mgal t
on
MT/yr
Apartments Mid
Rise

13.2914 /

9.83529

92.2973 0.0204 0.0107 96.0077
Mitigated
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total 46.6615 2.7576 0.0000 115.6020

0.0000 38.6983
Regional Shopping
Center

2.89 0.5866 0.0347 0.0000 1.4534
Recreational
Swimming Pool

76.95 15.6202 0.9231

0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000

0.0000 0.0000
High Turnover (Sit
Down Restaurant)

32.73 6.6439 0.3926 0.0000 16.4600
Enclosed Parking
with Elevator
0 0.0000 0.0000
Land Use tons t
o
MT/yr
Apartments Mid
Rise
117.3 23.8108 1.4072 0.0000 58.9904

0.0000 115.6020
Mitigated
Waste
Disposed
Total CO2 CH4 N2O CO2e
Total 46.6615 2.7576

0.0000 38.6983
Regional Shopping
Center

2.89 0.5866 0.0347 0.0000 1.4534
Recreational
Swimming Pool

76.95 15.6202 0.9231

0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000

0.0000 0.0000
High Turnover (Sit
Down Restaurant)

32.73 6.6439 0.3926 0.0000 16.4600
Enclosed Parking
with Elevator
0 0.0000 0.0000
Land Use tons t
o
MT/yr
Apartments Mid
Rise
117.3 23.8108 1.4072 0.0000 58.9904

8.2 Waste by Land Use
Unmitigated
Waste
Disposed
Total CO2 CH4 N2O CO2e
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:45 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied User Defined Equipment
Equipment Type Number

11.0 Vegetation
Horse Power Load Factor Fuel Type
Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year
Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment9.0 Operational Offroad
Equipment Type Number Hours/Day
Vehicle Trips - residential VMT provided by LLG, no trips associated with the swimming pool, assuming sat/sun trips are the same as weekday trips Vehicle Emission Factors -

0.004

1.3 User Entered Comments & Non-Default DataProject Characteristics - Land Use - based on data provided by the applicantConstruction Phase - CO2 Intensity (lb/MWhr)
683.98 CH4 Intensity
(lb/MWhr)

0.033 N2O Intensity
(lb/MWhr)
Climate Zone 9 Operational Year 2023Utility Company Pico Rivera Innovative Municipal Energy 0 1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 33 Regional Shopping Center 2.87 1000sqft 0.00 2,865.00
0 Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 729 Recreational Swimming Pool 17.50 1000sqft 0.00 17,500.00 0 High Turnover (Sit Down Restaurant) 2.87 1000sqft 0.00 2,865.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed Use Project Operations Run Los Angeles-South Coast County, Summer

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblFleetMix MDV 0.13 0.02tblFleetMix MH 3.3740e-003 6.5200e-004tblFleetMix LHD2 6.0830e-003 1.1760e-003tblFleetMix MCY 0.02 0.03tblFleetMix LDT2 0.19 0.22tblFleetMix LHD1 0.02 4.4630e-003tblFleetMix LDA 0.54 0.64tblFleetMix LDT1 0.06 0.07 tblFireplaces NumberWood 12.75 0.00
tblFleetMix HHD 8.0120e-003 1.5490e-003
tblFireplaces NumberGas 216.75 3.00tblFireplaces NumberNoFireplace 25.50 252.00tblFireplaces FireplaceDayYear 25.00 104.00tblFireplaces FireplaceWoodMass 1,019.20 0.00 tblAreaCoating Area_Residential_Exterior 175649 187461tblAreaCoating Area_Residential_Interior 526946 562383tblAreaCoating Area_Nonresidential_Interior 34845 293595tblAreaCoating Area_Parking 15360 11400 Table Name Column Name Default Value New Value
tblAreaCoating Area_Nonresidential_Exterior 11615 97865 Area Coating - residential area includes swimming pool, non-residential includes coating of the parking structureEnergy Use - Water And Wastewater - Assumes 100% aerobic treatment.Water Mitigation - Fleet Mix - see fleet mix adjustment for apartments in assumptions fileVehicle Emission Factors - Vehicle Emission Factors - Woodstoves - assumes 3 barbecue grills operating for 3 hours each on weekends CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblVehicleTrips PR_TP 54.00 100.00tblVehicleTrips ST_TR 4.91 4.57tblVehicleTrips PR_TP 86.00 100.00tblVehicleTrips PR_TP 37.00 100.00tblVehicleTrips PB_TP 43.00 0.00tblVehicleTrips PB_TP 11.00 0.00tblVehicleTrips HW_TL 14.70 10.08tblVehicleTrips PB_TP 3.00 0.00tblVehicleTrips HO_TL 8.70 10.08tblVehicleTrips HS_TL 5.90 10.08tblVehicleTrips DV_TP 20.00 0.00tblVehicleTrips DV_TP 35.00 0.00 tblSolidWaste SolidWasteGenerationRate 3.01 2.89
tblVehicleTrips DV_TP 11.00 0.00
tblSolidWaste SolidWasteGenerationRate 34.15 32.73tblSolidWaste SolidWasteGenerationRate 99.75 76.95 tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 0.07 0.00tblLandUse LotAcreage 0.07 0.00tblLandUse LotAcreage 0.40 0.00tblLandUse LandUseSquareFeet 2,870.00 2,865.00tblLandUse LotAcreage 4.36 0.34tblLandUse LandUseSquareFeet 2,870.00 2,865.00tblLandUse LandUseSquareFeet 255,000.00 260,220.00 tblFleetMix SBUS 6.9800e-004 1.3500e-004tblFleetMix UBUS 6.1100e-004 0.00tblFleetMix MHD 0.01 2.0250e-003tblFleetMix OBUS 9.2500e-004 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblWater SepticTankPercent 10.33 0.00tblWater SepticTankPercent 10.33 0.00tblWater OutdoorWaterUseRate 130,295.95 124,848.04tblWater SepticTankPercent 10.33 0.00tblWater OutdoorWaterUseRate 55,604.79 53,279.85tblWater OutdoorWaterUseRate 634,357.92 489,361.82tblWater IndoorWaterUseRate 1,035,005.02 798,432.44tblWater IndoorWaterUseRate 212,588.14 203,699.43tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater IndoorWaterUseRate 871,141.75 834,717.71tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AerobicPercent 87.46 100.00tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AerobicPercent 87.46 100.00tblWater AerobicPercent 87.46 100.00 tblVehicleTrips WD_TR 37.75 39.27
tblWater AerobicPercent 87.46 100.00
tblVehicleTrips WD_TR 112.18 110.47tblVehicleTrips WD_TR 28.82 0.00tblVehicleTrips SU_TR 21.10 39.27tblVehicleTrips WD_TR 5.44 4.57tblVehicleTrips SU_TR 142.64 110.47tblVehicleTrips SU_TR 13.60 0.00tblVehicleTrips ST_TR 46.12 39.27tblVehicleTrips SU_TR 4.09 4.57tblVehicleTrips ST_TR 122.40 110.47tblVehicleTrips ST_TR 9.10 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 12,397.126
5 12,397.126
5 0.7706 0.3981 12,535.017
3 0.7081 0.3733 11,136.429
3 Total 12.8256 5.3330 75.9815 0.1152 11.8768 0.2769 12.1537 3.1517 0.2713 3.4229 0.0000

0.0691 3.2208 11,007.485
7 11,007.485
7 Mobile 5.3744 4.0206 54.3814 0.1073 11.8768 0.0748 11.9515 3.1517 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8244

0.0378 1.1600e003 102.7636
Energy 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816 0.0816

1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714
003
Area 7.3331 0.2926 21.0922 0.1206 0.1206
N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
12,397.126
5 12,397.126
5 0.7706 0.3981 12,535.017
3 0.7081 0.3733 11,136.429
3 Total 12.8256 5.3330 75.9815 0.1152 11.8768 0.2769 12.1537 3.1517 0.2713 3.4229 0.0000

0.0691 3.2208 11,007.485
7 11,007.485
7 Mobile 5.3744 4.0206 54.3814 0.1073 11.8768 0.0748 11.9515 3.1517 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8244

0.0378 1.1600e003 102.7636
Energy 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816 0.0816

1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714
003
Area 7.3331 0.2926 21.0922 0.1206 0.1206
CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.2 Overall OperationalUnmitigated Operational
tblWoodstoves WoodstoveWoodMass 999.60 0.00

2.0 Emissions Summary
tblWoodstoves NumberNoncatalytic 12.75 0.00tblWoodstoves WoodstoveDayYear 25.00 0.00 tblWater SepticTankPercent 10.33 0.00
tblWoodstoves NumberCatalytic 12.75 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Regional Shopping Center 16.60 8.40 6.90 16.30 64.70 19.00 100 0 0 Recreational Swimming Pool 16.60 8.40 6.90 33.00 48.00 19.00 52 39 9 Other Non-Asphalt Surfaces 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 High Turnover (Sit Down 72.50 19.00 100 0 0
Restaurant)

16.60 8.40 6.90 8.50
Enclosed Parking with Elevator 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Apartments Mid Rise 10.08 10.08 10.08 40.20 19.20 40.60 100 0 0 Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by 5,680,513

4.3 Trip Type Information
Miles Trip % Trip Purpose %
Total 1,595.10 1,595.10 1,595.10 5,680,513
Regional Shopping Center 112.70 112.70 112.70 387,748 387,748 Recreational Swimming Pool 0.00 0.00 0.00
Other Non-Asphalt Surfaces 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00
High Turnover (Sit Down Restaurant) 317.05 317.05 317.05 1,016,956 1,016,956 Enclosed Parking with Elevator 0.00 0.00 0.00
Annual VMT
Apartments Mid Rise 1,165.35 1,165.35 1165.35 4,275,809 4,275,809 Land Use Weekday Saturday Sunday Annual VMT

0.3733 11,136.429
3 4.2 Trip Summary Information
Average Daily Trip Rate Unmitigated Mitigated

3.2208 11,007.485
7 11,007.485
7 Unmitigated 5.3744 4.0206 54.3814 0.1073 11.8768 0.0748 11.9515 3.1517 0.0691 0.7081 11,007.485
7 11,007.485
7 0.7081 0.3733 11,136.429
3 CO2e
Category lb/day lb/dayMitigated 5.3744 4.0206 54.3814 0.1073 11.8768 0.0748 11.9515 3.1517 0.0691 3.2208 Exhaust Bio- CO2 NBio- CO2 Total CO2 CH4 N2O
PM10
PM10 Total Fugitive
PM2 5
Exhaust
PM2 5
PM2.5 Total

4.0 Operational Detail - Mobile4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive
PM10

0.00 0.00 0.00
N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM2.5
Total
Fugitive Bio- CO2 NBio-CO2 Total CO2 CH4
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
ROG NOx CO SO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8244

0.0247 0.0236 1,295.8244
NaturalGas
Unmitigated

0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816 0.0816

6.4400e- 0.0816 0.0816 1,288.1695 1,288.1695
003
NaturalGas 0.0816 0.0816
Mitigated

0.1181 1.0198 0.5079
N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Historical Energy Use: N

5.1 Mitigation Measures Energy
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

0.000611 0.024394 0.000698 0.003374

5.0 Energy Detail
Regional Shopping Center 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925

0.000698 0.003374
Recreational Swimming Pool 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000611 0.024394 0.000698 0.003374
Other Non-Asphalt Surfaces 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 Other Asphalt Surfaces 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925

0.000698 0.003374
High Turnover (Sit Down
Restaurant)

0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000000 0.029705 0.000135 0.000652
Enclosed Parking with Elevator 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 Apartments Mid Rise 0.644264 0.074319 0.221712 0.020000 0.004463 0.001176 0.002025 0.001549 0.000000 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH

4.4 Fleet Mix
Land Use LDA LDT1 LDT2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

0.0816 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8245

1.5052 3.0000e005 3.0000e- 005 1.5142
Total 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816

1.0000e004 1.0500e- 1.0000e-004 1.5052 003 1.0000e- 005 Regional 1.0000e-004 1.0000e-004 Shopping Center 0.0127944 1.4000e-004 1.2500e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000
Recreational
Swimming Pool
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces
0 0.0000 0.0000
212.6980 212.6980 4.0800e003 3.9000e- 003 213.9619

0.0000 0.0000
High Turnover (Sit
Down Restaurant)

1.80793 0.0195 0.1773 0.1489 1.0600e003 0.0135 0.0135 0.0135 0.0135

0.0000 0.0000 0.0000 0.0000
1,073.9663 0.0206 0.0197 1,080.3484
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.3580 5.3700e- 0.0680 0.0680 1,073.9663
003
Apartments Mid 0.0680 0.0680
Rise

9.12871 0.0985 0.8413
N2O CO2e
Land Use kBTU/yr lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

0.0236 1,295.8245
Mitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

0.0816 1,288.1695 1,288.1695 0.0247

1.5052 3.0000e005 3.0000e- 005 1.5142
Total 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816

1.0000e004 1.0500e- 1.0000e-004 1.5052 003 1.0000e- 005 Regional 1.0000e-004 1.0000e-004 Shopping Center 12.7944 1.4000e-004 1.2500e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000
Recreational
Swimming Pool
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces
0 0.0000 0.0000
212.6980 212.6980 4.0800e003 3.9000e- 003 213.9619

0.0000 0.0000
High Turnover (Sit
Down Restaurant)
1807.93 0.0195 0.1773 0.1489 1.0600e003 0.0135 0.0135 0.0135 0.0135

0.0000 0.0000 0.0000 0.0000
1,073.9663 0.0206 0.0197 1,080.3484
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.3580 5.3700e- 0.0680 0.0680 1,073.9663
003
Apartments Mid 0.0680 0.0680
Rise
9128.71 0.0985 0.8413
CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2

5.2 Energy by Land Use - NaturalGasUnmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

0.0378 1.1600e003 1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714 102.7636 003 Total 7.3331 0.2926 21.0922 0.1206 0.1206

37.9420 37.9420 0.0366 38.8566

1.2200e003 1.1600e- 003 63.9069
Landscaping 0.6366 0.2428 21.0710 1.1100e003 0.1166 0.1166 0.1166 0.1166

4.0200e003 3.2000e- 4.0200e-003 0.0000 63.5294 63.5294 004 4.0200e- 003 Hearth 5.8200e- 4.0200e-003 003 0.0498 0.0212

0.0000 0.0000

0.0000
Consumer
Products

5.7030 0.0000 0.0000 0.0000 0.0000
Architectural 0.0000 0.0000 0.0000 0.0000 0.0000
Coating

0.9877
CH4 N2O CO2e
SubCategory lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0378 1.1600e003 102.7636

6.2 Area by SubCategoryUnmitigated
102.7636
Unmitigated 7.3331 0.2926 21.0922 1.4300e003 0.1206 0.1206 0.1206 0.1206 0.0000 101.4714 101.4714

0.0000 101.4714 101.4714 0.0378 1.1600e003
CO2e
Category lb/day lb/day
Mitigated 7.3331 0.2926 21.0922 1.4300e003 0.1206 0.1206 0.1206 0.1206 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O

6.0 Area Detail6.1 Mitigation Measures Area
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:49 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Hours/Day Days/Year Horse Power Load Factor Fuel Type

8.0 Waste Detail8.1 Mitigation Measures Waste9.0 Operational Offroad Equipment Type Number
Install Low Flow Bathroom FaucetInstall Low Flow Kitchen FaucetInstall Low Flow ToiletInstall Low Flow ShowerUse Water Efficient Irrigation System

0.0378 1.1600e003 102.7636

7.0 Water Detail7.1 Mitigation Measures Water

1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714
003
Total 7.3331 0.2926 21.0922 0.1206 0.1206

37.9420 37.9420 0.0366 38.8566

1.2200e003 1.1600e- 003 63.9069
Landscaping 0.6366 0.2428 21.0710 1.1100e003 0.1166 0.1166 0.1166 0.1166

4.0200e003 3.2000e- 4.0200e-003 0.0000 63.5294 63.5294 004 4.0200e- 003 Hearth 5.8200e- 4.0200e-003 003 0.0498 0.0212

0.0000 0.0000

0.0000
Consumer
Products

5.7030 0.0000 0.0000 0.0000 0.0000
Architectural 0.0000 0.0000 0.0000 0.0000 0.0000
Coating

0.9877
CH4 N2O CO2e
SubCategory lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO
Mitigated
Vehicle Trips - residential VMT provided by LLG, no trips associated with the swimming pool, assuming sat/sun trips are the same as weekday trips Vehicle Emission Factors -

0.004

1.3 User Entered Comments & Non-Default DataProject Characteristics - Land Use - based on data provided by the applicantConstruction Phase - CO2 Intensity (lb/MWhr)
683.98 CH4 Intensity
(lb/MWhr)

0.033 N2O Intensity
(lb/MWhr)
Climate Zone 9 Operational Year 2023Utility Company Pico Rivera Innovative Municipal Energy 0 1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 33 Regional Shopping Center 2.87 1000sqft 0.00 2,865.00
0 Apartments Mid Rise 255.00 Dwelling Unit 0.99 260,220.00 729 Recreational Swimming Pool 17.50 1000sqft 0.00 17,500.00 0 High Turnover (Sit Down Restaurant) 2.87 1000sqft 0.00 2,865.00 0 Other Non-Asphalt Surfaces 21.00 1000sqft 0.48 21,000.00 0 Other Asphalt Surfaces 45.00 1000sqft 1.03 45,000.00 0 Enclosed Parking with Elevator 190.00 1000sqft 0.34 190,000.00 Washington and Rosemead Mixed Use Project Operations Run Los Angeles-South Coast County, Winter

1.0 Project Characteristics1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblFleetMix MDV 0.13 0.02tblFleetMix MH 3.3740e-003 6.5200e-004tblFleetMix LHD2 6.0830e-003 1.1760e-003tblFleetMix MCY 0.02 0.03tblFleetMix LDT2 0.19 0.22tblFleetMix LHD1 0.02 4.4630e-003tblFleetMix LDA 0.54 0.64tblFleetMix LDT1 0.06 0.07 tblFireplaces NumberWood 12.75 0.00
tblFleetMix HHD 8.0120e-003 1.5490e-003
tblFireplaces NumberGas 216.75 3.00tblFireplaces NumberNoFireplace 25.50 252.00tblFireplaces FireplaceDayYear 25.00 104.00tblFireplaces FireplaceWoodMass 1,019.20 0.00 tblAreaCoating Area_Residential_Exterior 175649 187461tblAreaCoating Area_Residential_Interior 526946 562383tblAreaCoating Area_Nonresidential_Interior 34845 293595tblAreaCoating Area_Parking 15360 11400 Table Name Column Name Default Value New Value
tblAreaCoating Area_Nonresidential_Exterior 11615 97865 Area Coating - residential area includes swimming pool, non-residential includes coating of the parking structureEnergy Use - Water And Wastewater - Assumes 100% aerobic treatment.Water Mitigation - Fleet Mix - see fleet mix adjustment for apartments in assumptions fileVehicle Emission Factors - Vehicle Emission Factors - Woodstoves - assumes 3 barbecue grills operating for 3 hours each on weekends CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblVehicleTrips PR_TP 54.00 100.00tblVehicleTrips ST_TR 4.91 4.57tblVehicleTrips PR_TP 86.00 100.00tblVehicleTrips PR_TP 37.00 100.00tblVehicleTrips PB_TP 43.00 0.00tblVehicleTrips PB_TP 11.00 0.00tblVehicleTrips HW_TL 14.70 10.08tblVehicleTrips PB_TP 3.00 0.00tblVehicleTrips HO_TL 8.70 10.08tblVehicleTrips HS_TL 5.90 10.08tblVehicleTrips DV_TP 20.00 0.00tblVehicleTrips DV_TP 35.00 0.00 tblSolidWaste SolidWasteGenerationRate 3.01 2.89
tblVehicleTrips DV_TP 11.00 0.00
tblSolidWaste SolidWasteGenerationRate 34.15 32.73tblSolidWaste SolidWasteGenerationRate 99.75 76.95 tblLandUse LotAcreage 6.71 0.99tblLandUse LotAcreage 0.07 0.00tblLandUse LotAcreage 0.07 0.00tblLandUse LotAcreage 0.40 0.00tblLandUse LandUseSquareFeet 2,870.00 2,865.00tblLandUse LotAcreage 4.36 0.34tblLandUse LandUseSquareFeet 2,870.00 2,865.00tblLandUse LandUseSquareFeet 255,000.00 260,220.00 tblFleetMix SBUS 6.9800e-004 1.3500e-004tblFleetMix UBUS 6.1100e-004 0.00tblFleetMix MHD 0.01 2.0250e-003tblFleetMix OBUS 9.2500e-004 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblWater SepticTankPercent 10.33 0.00tblWater SepticTankPercent 10.33 0.00tblWater OutdoorWaterUseRate 130,295.95 124,848.04tblWater SepticTankPercent 10.33 0.00tblWater OutdoorWaterUseRate 55,604.79 53,279.85tblWater OutdoorWaterUseRate 634,357.92 489,361.82tblWater IndoorWaterUseRate 1,035,005.02 798,432.44tblWater IndoorWaterUseRate 212,588.14 203,699.43tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater IndoorWaterUseRate 871,141.75 834,717.71tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AerobicPercent 87.46 100.00tblWater AnaerobicandFacultativeLagoonsPercent 2.21 0.00tblWater AerobicPercent 87.46 100.00tblWater AerobicPercent 87.46 100.00 tblVehicleTrips WD_TR 37.75 39.27
tblWater AerobicPercent 87.46 100.00
tblVehicleTrips WD_TR 112.18 110.47tblVehicleTrips WD_TR 28.82 0.00tblVehicleTrips SU_TR 21.10 39.27tblVehicleTrips WD_TR 5.44 4.57tblVehicleTrips SU_TR 142.64 110.47tblVehicleTrips SU_TR 13.60 0.00tblVehicleTrips ST_TR 46.12 39.27tblVehicleTrips SU_TR 4.09 4.57tblVehicleTrips ST_TR 122.40 110.47tblVehicleTrips ST_TR 9.10 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 11,864.642
5 11,864.642
5 0.7928 0.4195 12,009.484
9 0.7304 0.3948 10,610.896
9 Total 12.7457 5.7088 74.6973 0.1100 11.8768 0.2770 12.1537 3.1517 0.2713 3.4230 0.0000

0.0691 3.2208 10,475.001
6 10,475.001
6 Mobile 5.2945 4.3965 53.0972 0.1021 11.8768 0.0748 11.9516 3.1517 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8244

0.0378 1.1600e003 102.7636
Energy 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816 0.0816

1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714
003
Area 7.3331 0.2926 21.0922 0.1206 0.1206
N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Mitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
11,864.642
5 11,864.642
5 0.7928 0.4195 12,009.484
9 0.7304 0.3948 10,610.896
9 Total 12.7457 5.7088 74.6973 0.1100 11.8768 0.2770 12.1537 3.1517 0.2713 3.4230 0.0000

0.0691 3.2208 10,475.001
6 10,475.001
6 Mobile 5.2945 4.3965 53.0972 0.1021 11.8768 0.0748 11.9516 3.1517 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8244

0.0378 1.1600e003 102.7636
Energy 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816 0.0816

1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714
003
Area 7.3331 0.2926 21.0922 0.1206 0.1206
CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

2.2 Overall OperationalUnmitigated Operational
tblWoodstoves WoodstoveWoodMass 999.60 0.00

2.0 Emissions Summary
tblWoodstoves NumberNoncatalytic 12.75 0.00tblWoodstoves WoodstoveDayYear 25.00 0.00 tblWater SepticTankPercent 10.33 0.00
tblWoodstoves NumberCatalytic 12.75 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Regional Shopping Center 16.60 8.40 6.90 16.30 64.70 19.00 100 0 0 Recreational Swimming Pool 16.60 8.40 6.90 33.00 48.00 19.00 52 39 9 Other Non-Asphalt Surfaces 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 High Turnover (Sit Down 72.50 19.00 100 0 0
Restaurant)

16.60 8.40 6.90 8.50
Enclosed Parking with Elevator 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Apartments Mid Rise 10.08 10.08 10.08 40.20 19.20 40.60 100 0 0 Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by 5,680,513

4.3 Trip Type Information
Miles Trip % Trip Purpose %
Total 1,595.10 1,595.10 1,595.10 5,680,513
Regional Shopping Center 112.70 112.70 112.70 387,748 387,748 Recreational Swimming Pool 0.00 0.00 0.00
Other Non-Asphalt Surfaces 0.00 0.00 0.00
Other Asphalt Surfaces 0.00 0.00 0.00
High Turnover (Sit Down Restaurant) 317.05 317.05 317.05 1,016,956 1,016,956 Enclosed Parking with Elevator 0.00 0.00 0.00
Annual VMT
Apartments Mid Rise 1,165.35 1,165.35 1165.35 4,275,809 4,275,809 Land Use Weekday Saturday Sunday Annual VMT

0.3948 10,610.896
9 4.2 Trip Summary Information
Average Daily Trip Rate Unmitigated Mitigated

3.2208 10,475.001
6 10,475.001
6 Unmitigated 5.2945 4.3965 53.0972 0.1021 11.8768 0.0748 11.9516 3.1517 0.0691 0.7304 10,475.001
6 10,475.001
6 0.7304 0.3948 10,610.896
9 CO2e
Category lb/day lb/dayMitigated 5.2945 4.3965 53.0972 0.1021 11.8768 0.0748 11.9516 3.1517 0.0691 3.2208 Exhaust Bio- CO2 NBio- CO2 Total CO2 CH4 N2O
PM10
PM10 Total Fugitive
PM2 5
Exhaust
PM2 5
PM2.5 Total

4.0 Operational Detail - Mobile4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive
PM10

0.00 0.00 0.00
N20 CO2e
Percent
Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM2.5
Total
Fugitive Bio- CO2 NBio-CO2 Total CO2 CH4
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
ROG NOx CO SO2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8244

0.0247 0.0236 1,295.8244
NaturalGas
Unmitigated

0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816 0.0816

6.4400e- 0.0816 0.0816 1,288.1695 1,288.1695
003
NaturalGas 0.0816 0.0816
Mitigated

0.1181 1.0198 0.5079
N2O CO2e
Category lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4
Historical Energy Use: N

5.1 Mitigation Measures Energy
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

0.000611 0.024394 0.000698 0.003374

5.0 Energy Detail
Regional Shopping Center 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925

0.000698 0.003374
Recreational Swimming Pool 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000611 0.024394 0.000698 0.003374
Other Non-Asphalt Surfaces 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 Other Asphalt Surfaces 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925

0.000698 0.003374
High Turnover (Sit Down
Restaurant)

0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 0.000698 0.003374

0.000000 0.029705 0.000135 0.000652
Enclosed Parking with Elevator 0.544785 0.062844 0.187478 0.127235 0.023089 0.006083 0.010475 0.008012 0.000925 0.000611 0.024394 Apartments Mid Rise 0.644264 0.074319 0.221712 0.020000 0.004463 0.001176 0.002025 0.001549 0.000000 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH

4.4 Fleet Mix
Land Use LDA LDT1 LDT2
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

0.0816 1,288.1695 1,288.1695 0.0247 0.0236 1,295.8245

1.5052 3.0000e005 3.0000e- 005 1.5142
Total 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816

1.0000e004 1.0500e- 1.0000e-004 1.5052 003 1.0000e- 005 Regional 1.0000e-004 1.0000e-004 Shopping Center 0.0127944 1.4000e-004 1.2500e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000
Recreational
Swimming Pool
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces
0 0.0000 0.0000
212.6980 212.6980 4.0800e003 3.9000e- 003 213.9619

0.0000 0.0000
High Turnover (Sit
Down Restaurant)

1.80793 0.0195 0.1773 0.1489 1.0600e003 0.0135 0.0135 0.0135 0.0135

0.0000 0.0000 0.0000 0.0000
1,073.9663 0.0206 0.0197 1,080.3484
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.3580 5.3700e- 0.0680 0.0680 1,073.9663
003
Apartments Mid 0.0680 0.0680
Rise

9.12871 0.0985 0.8413
N2O CO2e
Land Use kBTU/yr lb/day lb/day
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4

0.0236 1,295.8245
Mitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5

0.0816 1,288.1695 1,288.1695 0.0247

1.5052 3.0000e005 3.0000e- 005 1.5142
Total 0.1181 1.0198 0.5079 6.4400e003 0.0816 0.0816 0.0816

1.0000e004 1.0500e- 1.0000e-004 1.5052 003 1.0000e- 005 Regional 1.0000e-004 1.0000e-004 Shopping Center 12.7944 1.4000e-004 1.2500e-003

0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000
Recreational
Swimming Pool
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000
Other Non-Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces
0 0.0000 0.0000
212.6980 212.6980 4.0800e003 3.9000e- 003 213.9619

0.0000 0.0000
High Turnover (Sit
Down Restaurant)
1807.93 0.0195 0.1773 0.1489 1.0600e003 0.0135 0.0135 0.0135 0.0135

0.0000 0.0000 0.0000 0.0000
1,073.9663 0.0206 0.0197 1,080.3484
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.3580 5.3700e- 0.0680 0.0680 1,073.9663
003
Apartments Mid 0.0680 0.0680
Rise
9128.71 0.0985 0.8413
CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2

5.2 Energy by Land Use - NaturalGasUnmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

0.0378 1.1600e003 1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714 102.7636 003 Total 7.3331 0.2926 21.0922 0.1206 0.1206

37.9420 37.9420 0.0366 38.8566

1.2200e003 1.1600e- 003 63.9069
Landscaping 0.6366 0.2428 21.0710 1.1100e003 0.1166 0.1166 0.1166 0.1166

4.0200e003 3.2000e- 4.0200e-003 0.0000 63.5294 63.5294 004 4.0200e- 003 Hearth 5.8200e- 4.0200e-003 003 0.0498 0.0212

0.0000 0.0000

0.0000
Consumer
Products

5.7030 0.0000 0.0000 0.0000 0.0000
Architectural 0.0000 0.0000 0.0000 0.0000 0.0000
Coating

0.9877
CH4 N2O CO2e
SubCategory lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO

0.0378 1.1600e003 102.7636

6.2 Area by SubCategoryUnmitigated
102.7636
Unmitigated 7.3331 0.2926 21.0922 1.4300e003 0.1206 0.1206 0.1206 0.1206 0.0000 101.4714 101.4714

0.0000 101.4714 101.4714 0.0378 1.1600e003
CO2e
Category lb/day lb/day
Mitigated 7.3331 0.2926 21.0922 1.4300e003 0.1206 0.1206 0.1206 0.1206 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O

6.0 Area Detail6.1 Mitigation Measures Area
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 1
Date: 6/30/2022 5:50 PM
Washington and Rosemead Mixed Use Project Operations Run - Los Angeles-South Coast County, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Hours/Day Days/Year Horse Power Load Factor Fuel Type

8.0 Waste Detail8.1 Mitigation Measures Waste9.0 Operational Offroad Equipment Type Number
Install Low Flow Bathroom FaucetInstall Low Flow Kitchen FaucetInstall Low Flow ToiletInstall Low Flow ShowerUse Water Efficient Irrigation System

0.0378 1.1600e003 102.7636

7.0 Water Detail7.1 Mitigation Measures Water

1.4300e- 0.1206 0.1206 0.0000 101.4714 101.4714
003
Total 7.3331 0.2926 21.0922 0.1206 0.1206

37.9420 37.9420 0.0366 38.8566

1.2200e003 1.1600e- 003 63.9069
Landscaping 0.6366 0.2428 21.0710 1.1100e003 0.1166 0.1166 0.1166 0.1166

4.0200e003 3.2000e- 4.0200e-003 0.0000 63.5294 63.5294 004 4.0200e- 003 Hearth 5.8200e- 4.0200e-003 003 0.0498 0.0212

0.0000 0.0000

0.0000
Consumer
Products

5.7030 0.0000 0.0000 0.0000 0.0000
Architectural 0.0000 0.0000 0.0000 0.0000 0.0000
Coating

0.9877
CH4 N2O CO2e
SubCategory lb/day lb/day
Exhaust
PM2.5
SO2 Fugitive PM2.5 Total Bio- CO2 NBio- CO2 Total CO2
PM10
Exhaust
PM10
PM10 Total Fugitive
PM2.5
ROG NOx CO
Mitigated
LST Worksheets

SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 2.00 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 8 3 1.5
NOx 114 Graders 0.5 0.0625 0
CO 861 Dozers 0.5 0.0625 8 1 0.5
PM10 7.00 Scrapers 1 0.125 0
PM2.5 4.00 Acres 2.00
Acres 25 50 100 200 500
NOx 2 114 111 121 145 205
2 114 111 121 145 205
114 111 121 145 205
CO 2 861 1082 1496 2625 7500
2 861 1082 1496 2625 7500
861 1082 1496 2625 7500
PM10 2 7 21 39 74 182
2 7 21 39 74 182
7 21 39 74 182
PM2.5 2 4 6 10 22 92
2 4 6 10 22 92
4 6 10 22 92
Southeast LA County

2.00 Acres
25 50 100 200 500
NOx 114 111 121 145 205
CO 861 1082 1496 2625 7500
PM10 7 21 39 74 182
PM2.5 4 6 10 22 92
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 2 5 2
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Asphalt Demolition SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 2.00 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 8 3 1.5
NOx 114 Graders 0.5 0.0625 0
CO 861 Dozers 0.5 0.0625 8 1 0.5
PM10 7.00 Scrapers 1 0.125 0
PM2.5 4.00 Acres 2.00
Acres 25 50 100 200 500
NOx 2 114 111 121 145 205
2 114 111 121 145 205
114 111 121 145 205
CO 2 861 1082 1496 2625 7500
2 861 1082 1496 2625 7500
861 1082 1496 2625 7500
PM10 2 7 21 39 74 182
2 7 21 39 74 182
7 21 39 74 182
PM2.5 2 4 6 10 22 92
2 4 6 10 22 92
4 6 10 22 92
Southeast LA County

2.00 Acres
25 50 100 200 500
NOx 114 111 121 145 205
CO 861 1082 1496 2625 7500
PM10 7 21 39 74 182
PM2.5 4 6 10 22 92
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 2 5 2
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Asphalt Demolition and Debris Haul SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 1.94 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 7 1 0.4375
NOx 112 Graders 0.5 0.0625 8 1 0.5
CO 843 Dozers 0.5 0.0625 0
PM10 6.81 Scrapers 1 0.125 8 1 1
PM2.5 3.94 Acres 1.94
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
2 114 111 121 145 205
112 109 119 144 204
CO 1 571 735 1088 2104 6854
2 861 1082 1496 2625 7500
843 1060 1471 2592 7460
PM10 1 4 13 30 66 173
2 7 21 39 74 182
7 21 38 74 181
PM2.5 1 3 4 8 19 86
2 4 6 10 22 92
4 6 10 22 92
Southeast LA County

1.94 Acres
25 50 100 200 500
NOx 112 109 119 144 204
CO 843 1060 1471 2592 7460
PM10 7 21 38 74 181
PM2.5 4 6 10 22 92
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 2
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Site Preparation SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 2.85 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 7 2 0.875
NOx 130 Graders 0.5 0.0625 8 1 0.5
CO 1,036 Dozers 0.5 0.0625 8 1 0.5
PM10 8.98 Scrapers 1 0.125 8 1 1
PM2.5 4.85 Acres 2.88
Acres 25 50 100 200 500
NOx 2 114 111 121 145 205
3 133 129 139 161 218
130 126 137 159 216
CO 2 861 1082 1496 2625 7500
3 1067 1340 1810 3039 8104
1036 1301 1763 2977 8013
PM10 2 7 21 39 74 182
3 9 28 46 81 189
9 27 45 80 188
PM2.5 2 4 6 10 22 92
3 5 7 12 25 96
5 7 11 24 95
Southeast LA County

2.85 Acres
25 50 100 200 500
NOx 130 126 137 159 216
CO 1036 1301 1763 2977 8013
PM10 9 27 45 80 188
PM2.5 5 7 11 24 95
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 2 5 3
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Rough Grading SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 2.85 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 7 2 0.875
NOx 130 Graders 0.5 0.0625 8 1 0.5
CO 1,036 Dozers 0.5 0.0625 8 1 0.5
PM10 8.98 Scrapers 1 0.125 8 1 1
PM2.5 4.85 Acres 2.88
Acres 25 50 100 200 500
NOx 2 114 111 121 145 205
3 133 129 139 161 218
130 126 137 159 216
CO 2 861 1082 1496 2625 7500
3 1067 1340 1810 3039 8104
1036 1301 1763 2977 8013
PM10 2 7 21 39 74 182
3 9 28 46 81 189
9 27 45 80 188
PM2.5 2 4 6 10 22 92
3 5 7 12 25 96
5 7 11 24 95
Southeast LA County

2.85 Acres
25 50 100 200 500
NOx 130 126 137 159 216
CO 1036 1301 1763 2977 8013
PM10 9 27 45 80 188
PM2.5 5 7 11 24 95
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 2 5 3
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Rough Grading and Soil Haul SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 0.50 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 8 1 0.5
NOx 80 Graders 0.5 0.0625 0
CO 571 Dozers 0.5 0.0625 0
PM10 4.00 Scrapers 1 0.125 0
PM2.5 3.00 Acres 0.50
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
1 80 81 94 123 192
80 81 94 123 192
CO 1 571 735 1088 2104 6854
1 571 735 1088 2104 6854
571 735 1088 2104 6854
PM10 1 4 13 30 66 173
1 4 13 30 66 173
4 13 30 66 173
PM2.5 1 3 4 8 19 86
1 3 4 8 19 86
3 4 8 19 86
Southeast LA County

0.50 Acres
25 50 100 200 500
NOx 80 81 94 123 192
CO 571 735 1088 2104 6854
PM10 4 13 30 66 173
PM2.5 3 4 8 19 86
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 1
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Utilities Trenching SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 1.38 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 8 2 1
NOx 93 Tractors 0.5 0.0625 6 1 0.375
CO 680 Graders 0.5 0.0625 0
PM10 5.12 Dozers 0.5 0.0625 0
PM2.5 3.37 Scrapers 1 0.125 0
Acres 1.38
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
2 114 111 121 145 205
93 92 104 131 197
CO 1 571 735 1088 2104 6854
2 861 1082 1496 2625 7500
680 865 1241 2299 7096
PM10 1 4 13 30 66 173
2 7 21 39 74 182
5 16 33 69 176
PM2.5 1 3 4 8 19 86
2 4 6 10 22 92
3 5 9 20 88
Southeast LA County

1.38 Acres
25 50 100 200 500
NOx 93 92 104 131 197
CO 680 865 1241 2299 7096
PM10 5 16 33 69 176
PM2.5 3 5 9 20 88
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 2
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Utilities Trenching, Fine Grading and Soil Haul, and Building Construction
SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 0.88 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 8 1 0.5
NOx 80 Tractors 0.5 0.0625 6 1 0.375
CO 571 Graders 0.5 0.0625 0
PM10 4.00 Dozers 0.5 0.0625 0
PM2.5 3.00 Scrapers 1 0.125 0
Acres 0.88
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
1 80 81 94 123 192
80 81 94 123 192
CO 1 571 735 1088 2104 6854
1 571 735 1088 2104 6854
571 735 1088 2104 6854
PM10 1 4 13 30 66 173
1 4 13 30 66 173
4 13 30 66 173
PM2.5 1 3 4 8 19 86
1 3 4 8 19 86
3 4 8 19 86
Southeast LA County

0.88 Acres
25 50 100 200 500
NOx 80 81 94 123 192
CO 571 735 1088 2104 6854
PM10 4 13 30 66 173
PM2.5 3 4 8 19 86
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 1
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Utilities Trenching and Building Construction SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 0.38 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 6 1 0.375
NOx 80 Graders 0.5 0.0625 0
CO 571 Dozers 0.5 0.0625 0
PM10 4.00 Scrapers 1 0.125 0
PM2.5 3.00 Acres 0.38
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
1 80 81 94 123 192
80 81 94 123 192
CO 1 571 735 1088 2104 6854
1 571 735 1088 2104 6854
571 735 1088 2104 6854
PM10 1 4 13 30 66 173
1 4 13 30 66 173
4 13 30 66 173
PM2.5 1 3 4 8 19 86
1 3 4 8 19 86
3 4 8 19 86
Southeast LA County

0.38 Acres
25 50 100 200 500
NOx 80 81 94 123 192
CO 571 735 1088 2104 6854
PM10 4 13 30 66 173
PM2.5 3 4 8 19 86
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 1
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Building Construction SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 0.88 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 6 1 0.375
NOx 80 Tractors 0.5 0.0625 8 1 0.5
CO 571 Graders 0.5 0.0625 0
PM10 4.00 Dozers 0.5 0.0625 0
PM2.5 3.00 Scrapers 1 0.125 0
Acres 0.88
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
1 80 81 94 123 192
80 81 94 123 192
CO 1 571 735 1088 2104 6854
1 571 735 1088 2104 6854
571 735 1088 2104 6854
PM10 1 4 13 30 66 173
1 4 13 30 66 173
4 13 30 66 173
PM2.5 1 3 4 8 19 86
1 3 4 8 19 86
3 4 8 19 86
Southeast LA County

0.88 Acres
25 50 100 200 500
NOx 80 81 94 123 192
CO 571 735 1088 2104 6854
PM10 4 13 30 66 173
PM2.5 3 4 8 19 86
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 1
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Building Construction and Paving SRA No. Acres
Source
Receptor
Distance
(meters)
Source
Receptor
Distance (Feet)
Project site
Acreage
Disturbed
5 0.38 25 82 2.85
Source Receptor Southeast LA County Equipment Acres/8-hr Day Daily hours Equipment Used Acres Distance (meters) 25 Tractors 0.5 0.0625 6 1 0.375
NOx 80 Graders 0.5 0.0625 0
CO 571 Dozers 0.5 0.0625 0
PM10 4.00 Scrapers 1 0.125 0
PM2.5 3.00 Acres 0.38
Acres 25 50 100 200 500
NOx 1 80 81 94 123 192
1 80 81 94 123 192
80 81 94 123 192
CO 1 571 735 1088 2104 6854
1 571 735 1088 2104 6854
571 735 1088 2104 6854
PM10 1 4 13 30 66 173
1 4 13 30 66 173
4 13 30 66 173
PM2.5 1 3 4 8 19 86
1 3 4 8 19 86
3 4 8 19 86
Southeast LA County

0.38 Acres
25 50 100 200 500
NOx 80 81 94 123 192
CO 571 735 1088 2104 6854
PM10 4 13 30 66 173
PM2.5 3 4 8 19 86
Acre Below Acre Above
SRA No. Acres SRA No. Acres
5 1 5 1
Distance Increment Below
25 Distance Increment Above
25 Updated: 10/21/2009 - Table C-1. 2006 – 2008
Construction Localized Significance Thresholds - Building Construction and Architectural Coating Energy Calculations

Construction-Related Fuel/Energy Usage
VMT Gallons VMT Gallons VMT kWh
2022 1,130,150 39,860 8,282 188 17,515 5,760
2023 1,049,511 37,092 7,100 164 16,251 5,301
Total 2,179,660 76,952 15,382 351 33,766 11,060
VMT Gallons VMT Gallons
2022 6,985 1,386 78,144 9,799
2023 9,473 1,854 107,849 12,795
Total 16,457 3,240 185,993 22,594
VMT Gallons VMT Gallons
2022 66 16 76,619 11,622
Total 66 16 76,619 11,622
2022 8,346 29,074
2023 10,411 20,464
Total 18,757 49,537
VMT Gallons VMT Gallons VMT kWh
2022 1,137,200 49,609 163,046 50,682 17,515 5,760
2023 1,058,983 49,357 114,949 33,423 16,251 5,301
Total 2,196,183 98,966 277,995 84,105 33,766 11,060

CONSTRUCTION TOTAL
Year
Gas Diesel Electricity

CONSTRUCTION VENDOR TRIPS

CONSTRUCTION WORKER COMMUTE
Year
Gas Diesel Electricity
Year
Gas Diesel

CONSTRUCTION OFF-ROAD

EQUIPMENT
Year
Gasoline
gallons
Diesel
gallons

CONSTRUCTION TRUCK HAUL TRIPS
Year
Gas Diesel
Construction Worker Trips Fuel Usage Worksheet
Note: Per CalEEMod methodology, worker vehicles are "LD_Mix", which is 50% LDA, 25% LDT1, and 25% LDT2 Activity1 Daily trips1,2 Trip miles2 Trip days1 Annual VMT Asphalt Demolition 13 14.7 37 7,071
Asphalt Demolition Debris Haul 0 14.7 5 0
Site Preparation 8 14.7 6 706
Rough Grading 18 14.7 30 7,938
Rough Grading Soil Haul 0 14.7 12 0
Utility Trenching 20 14.7 60 17,640
Fine Grading 15 14.7 20 4,410
Fine Grading Soil Haul 0 14.7 20 0
Building Construction 2022 299 14.7 167 734,015
0 0
Building Construction 2023 299 14.7 240 1,054,872
Paving 15 14.7 19 4,190
Architectural Coating 60 14.7 19 16,758
0 1 Based on information provided.
2 Based on CalEEMod defaults.

LDA mpg LDA gallons LDT1 mpg LDT1 gallons LDT2 mpg LDT2 gallons LDA mpg LDA gallons LDT1 mpg LDT1 gallons LDT2 mpg LDT2 gallons LDA m/kWh LDA kWh LDT1 m/kWh LDT1 kWh VMT Gallons VMT Gallons VMT kWh 2022 771,779 192,945 192,945 30.28 24,734 26.12 7,322 24.33 7,804 47.29 144 21.78 3 34.76 40 3.04 5,225 3.04 534 1,130,150 39,860 8,282 188 17,515 5,760 2023 537,910 268,955 268,955 31.12 16,699 26.80 9,919 25.20 10,473 48.57 102 22.08 4 35.74 57 3.07 4,319 3.07 982 1,049,511 37,092 7,100 164 16,251 5,301 2,179,660 76,952 15,382 351 33,766 11,060
1 EMFAC2017 v1.0.3.

LDA LDT1 LDT2 LDA LDT1 LDT2 LDA LDT1
2022 97.06% 99.12% 98.39% 0.88% 0.04% 0.72% 2.06% 0.84% 2023 96.62% 98.85% 98.14% 0.92% 0.03% 0.76% 2.46% 1.12% Year Estimated Electric Consumption

0.34 14.6 2013 0.34

0.35 12.9 2014 0.34

0.36 13.3 2015 0.34

0.34 13.3 2016 0.34
2017 0.34
2018 0.34
2019 0.34
2020 0.33
2021 0.33
2022 0.33
2023 0.33
2024 0.32
2025 0.32
2026 0.32
2027 0.32
2028 0.31
2029 0.31
2030 0.31
2031 0.31
2032 0.30
2033 0.30
https://www.fhwa.dot.gov/environment/climate_change/mitigation/publications_and_tools/ev_deployment/page08.cfm 2034 0.30 2035 0.29
VMT from electricity
Diesel1 Electricity Gasoline Diesel Electricity 1 Gasoline1 2022
Year VMT from gasoline VMT from diesel
Year LDA VMT LDT1 VMT LDT2 VMT
2023
Vendor Trips Fuel Usage Worksheet
Note: Based on CalEEMod methodology, vendor vehicles HHDT (T7).

Activity1 Daily trips1,2 Trip miles2 Trip days1 Annual VMT Asphalt Demolition 2 6.9 37 511
Asphalt Demolition Debris Haul 0 6.9 5 0
Site Preparation 2 6.9 6 83
Rough Grading 2 6.9 30 414
Rough Grading Soil Haul 0 6.9 12 0
Utility Trenching 4 6.9 60 1,656
Fine Grading 6 6.9 20 828
Fine Grading Soil Haul 0 6.9 20 0
Building Construction 2022 72 6.9 167 82,966
Building Construction 2023 72 6.9 240 119,232
Paving 0 6.9 19 0
Architectural Coating 0 6.9 19 0
0 1 Based on information provided.
2 Based on CalEEMod defaults.

VENDOR
Year HHDT (T7) VMT MHDT (T6) VMT Gasoline Diesel
HHDT (T7) mpg HHDT (T7) gallons MHDT (T6) mpg MHDT (T6) gallons HHDT (T7) mpg HHDT (T7) gallons MHDT (T6) mpg MHDT (T6) gallons VMT Gallons VMT Gallons 2022 43,229 43,229 4.10 9 5.04 1,378 6.59 6,350 10.52 3,448 6,984.79 1,386.40 78,144 9,799 2023 59,616 59,616 4.20 12 5.12 1,842 7.00 8,232 11.00 4,563 9,472.67 1,853.96 107,849 12,795 16,457.46 3,240.36 185,993 22,594
1 EMFAC2017 v1.0.3.

Year
HHDT (T7) MHDT (T6) HHDT (T7) MHDT (T6)
2022 0.08% 16.07% 96.85% 83.93%
2023 0.08% 15.81% 96.71% 84.19%
2023
Diesel1 Gasoline1
VMT from gasoline VMT from diesel
2022
Truck Haul Trips Fuel Usage Worksheet
Note: Hauling vehicles are HHDT (T7)
Activity Total Trips1 Mi/Trip1 Annual VMT
2022
Asphalt Demolition Debris Haul 184 19 3,496
Rough Grading Soil Haul 1,058 19 20,102
Fine Grading Soil Haul 2,858 19 54,302
0 1 Based on information provided by the District.

HHDT (T7) mpg HHDT (T7) gallons HHDT (T7) mpg HHDT (T7) gallons VMT Gallons VMT Gallons 2022 77,900 4.10 16 6.59 11,622 66 16 76,619 11,622
66 16 76,619 11,622
1 EMFAC2017 v1.0.3.

Year VMT from gasoline VMT from diesel
2022 0.08% 98.36%
Gasoline Diesel 1 Diesel1
Year VMT Gasoline
Off-Road Construction Equipment Fuel Usage Worksheet
Total Gasoline Total Diesel Total Natural Gas
Year
2022 8,346 29,074 0
2023 10,411 20,464 0
Total 18,757 49,537 0
Equipment Type1
Number of
Equipment1 Horsepower
OFFROAD2017
Horsepower Category Fuel Type Working days1 Hours Per Day Total Hours of
Operation
Gasoline
Gal/Hr2
Total Gasoline
gallons Diesel Gal/Hr2
Total Diesel
gallons
Natural Gas
Gal/Hr2
Total Natural
Gas gallons
Concrete/Industrial Saws 1 81 100 Gasoline 37 8 296 4.71 1,396 0.00 0 0.00 0 Rubber Tired Dozers 1 247 300 Diesel 37 8 296 0.00 0 4.54 1,343 0.00 0 Tractors/Loaders/Backhoes 3 97 100 Diesel 37 8 888 0.00 0 1.59 1,413 0.00 0 Graders 1 187 300 Diesel 6 8 48 0.00 0 4.58 220 0.00 0
Scrapers 1 367 600 Diesel 6 8 48 0.00 0 10.55 507 0.00 0 Tractors/Loaders/Backhoes 1 276 300 Diesel 6 7 42 0.00 0 3.98 167 0.00 0 Excavators 1 270 300 Diesel 30 8 240 0.00 0 4.32 1,037 0.00 0 Graders 1 187 300 Diesel 30 8 240 0.00 0 4.58 1,099 0.00 0 Rollers 1 134 175 Diesel 30 8 240 0.00 0 2.79 669 0.00 0 Rubber Tired Dozers 1 247 300 Diesel 30 8 240 0.00 0 4.54 1,089 0.00 0 Scrapers 1 367 600 Diesel 30 8 240 0.00 0 10.55 2,533 0.00 0 Tractors/Loaders/Backhoes 2 97 100 Diesel 30 7 420 0.00 0 1.59 668 0.00 0 Excavators 1 249 300 Diesel 60 6 360 0.00 0 4.32 1,556 0.00 0 Tractors/Loaders/Backhoes 1 225 300 Diesel 60 8 480 0.00 0 3.98 1,908 0.00 0 Trenchers 1 50 50 Diesel 60 8 480 0.00 0 1.15 554 0.00 0 Plate Compactors 5 7 25 Diesel 60 8 2,400 0.00 0 0.20 472 0.00 0 Tractors/Loaders/Backhoes 1 225 300 Diesel 20 8 160 0.00 0 3.98 636 0.00 0 Plate Compactors 5 7 25 Diesel 20 8 800 0.00 0 0.20 157 0.00 0 Cranes 1 231 300 Diesel 167 8 1,336 0.00 0 3.28 4,387 0.00 0 Generator Sets 1 84 100 Gasoline 167 8 1,336 5.20 6,951 0.00 0 0.00 0 Tractors/Loaders/Backhoes 1 97 100 Diesel 167 6 1,002 0.00 0 1.59 1,594 0.00 0 Forklifts 2 89 100 Diesel 167 7 2,338 0.00 0 0.98 2,296 0.00 0 Welders 3 46 50 Diesel 167 8 4,008 0.00 0 1.19 4,769 0.00 0 TOTAL 8,346 29,074 0
Cranes 1 231 300 Diesel 240 8 1,920 0.00 0 3.28 6,293 0.00 0 Generator Sets 1 84 100 Gasoline 240 8 1,920 5.20 9,982 0.00 0 0.00 0 Tractors/Loaders/Backhoes 1 97 100 Diesel 240 6 1,440 0.00 0 1.59 2,293 0.00 0 Forklifts 2 89 100 Diesel 240 7 3,360 0.00 0 0.98 3,299 0.00 0 Welders 3 46 50 Diesel 240 8 5,760 0.00 0 1.19 6,849 0.00 0 Cement and Mortar Mixers 1 9 25 Diesel 19 8 152 0.00 0 0.33 50 0.00 0 Pavers 1 130 175 Diesel 19 8 152 0.00 0 3.40 517 0.00 0 Paving Equipment 1 132 175 Diesel 19 8 152 0.00 0 2.67 405 0.00 0 Tractors/Loaders/Backhoes 1 97 100 Diesel 19 8 152 0.00 0 1.59 242 0.00 0 Rollers 2 80 100 Diesel 19 8 304 0.00 0 1.69 515 0.00 0 Air Compressors 1 78 100 Gasoline 19 6 114 3.77 429 0.00 0 0.00 0 TOTAL 10,411 20,464 0
1 Based on information provided.
2 OFFROAD2017 v.1.0.1
2022
Rough Grading
Utility Trenching
Fine Grading
Building Construction
Asphalt Demolition
Site Preparation
Gallons
2023
Building Construction
Paving
Architectural Coating
ELEC
VMT/day Gallons/day Miles/gallon VMT/day Gallons/day Miles/gallon VMT/day Gallons/day Miles/gallon VMT/day All other buses 0 0 0.00 144,213 14,122 10.21 0 0 0.00 0 LDA 149,966,457 4,951,891 30.28 1,365,564 28,876 47.29 0 0 0.00 3,181,478 LDT1 17,043,180 652,540 26.12 6,627 304 21.78 0 0 0.00 144,752 LDT2 51,802,173 2,129,498 24.33 378,461 10,888 34.76 0 0 0.00 469,870 LHD1 3,836,225 367,280 10.44 2,744,971 126,149 21.76 0 0 0.00 0 LHD2 625,803 68,770 9.10 1,067,421 54,454 19.60 0 0 0.00 0 MCY 1,237,635 34,667 35.70 0 0 0.00 0 0 0.00 0
MDV 32,233,548 1,629,223 19.78 771,652 28,703 26.88 0 0 0.00 250,682 MH 190,935 37,177 5.14 61,785 5,859 10.54 0 0 0.00 0
Motor coach 0 0 0.00 91,142 13,998 6.51 0 0 0.00 0
OBUS 163,041 32,643 4.99 0 0 0.00 0 0 0.00 0
PTO 0 0 0.00 76,505 15,508 4.93 0 0 0.00 0
SBUS 55,608 6,053 9.19 109,536 14,360 7.63 0 0 0.00 0
T6 793,122 157,239 5.04 4,140,797 393,561 10.52 0 0 0.00 0 T7 5,769 1,407 4.10 6,735,541 1,021,710 6.59 106,828 47,783 2.24 0 UBUS 32,989 7,783 4.24 1,181 209 5.66 437,121 111,088 3.93 1,070 Total 257,986,485 10,076,171 25.60 17,695,397 1,728,701 10.24 543,949 158,871 3.42 4,047,852 Source: EMFAC2017 (v1.0.3) Emissions Inventory
Region Type: Sub-Area
Region: Los Angeles (SC)
Calendar Year: 2022
Season: Annual
Vehicle Classification: EMFAC2011 Categories
Units: miles/day for VMT, trips/day for Trips, tons/day for Emissions, 1000 gallons/day for Fuel Consumption Region Calendar Year Vehicle Category Model Year Speed Fuel Population VMT Trips Fuel Consumption Los Angeles (SC) 2022 All Other Buses Aggregate Aggregate DSL 2387.615771 144212.5891 20055.97247 14.12157342 Los Angeles (SC) 2022 LDA Aggregate Aggregate GAS 3949334.32 149966456.8 18636854.28 4951.890616 Los Angeles (SC) 2022 LDA Aggregate Aggregate DSL 34750.74201 1365564.321 164528.3052 28.87579459 Los Angeles (SC) 2022 LDA Aggregate Aggregate ELEC 78084.60157 3181477.948 389918.6908 0 Los Angeles (SC) 2022 LDT1 Aggregate Aggregate GAS 458115.2498 17043179.81 2118381.376 652.5401757 Los Angeles (SC) 2022 LDT1 Aggregate Aggregate DSL 270.6503295 6627.200698 961.4710483 0.304298206 Los Angeles (SC) 2022 LDT1 Aggregate Aggregate ELEC 3508.68045 144752.0157 17546.16027 0 Los Angeles (SC) 2022 LDT2 Aggregate Aggregate GAS 1372144.276 51802172.9 6443902.5 2129.497975 Los Angeles (SC) 2022 LDT2 Aggregate Aggregate DSL 8920.377392 378460.5711 44003.20424 10.88805719 Los Angeles (SC) 2022 LDT2 Aggregate Aggregate ELEC 14383.25646 469869.8144 72773.64326 0 Los Angeles (SC) 2022 LHD1 Aggregate Aggregate GAS 105423.6869 3836224.58 1570655.854 367.2799521 Los Angeles (SC) 2022 LHD1 Aggregate Aggregate DSL 64097.22758 2744971.33 806262.4886 126.1492688 Los Angeles (SC) 2022 LHD2 Aggregate Aggregate GAS 17796.61867 625803.0177 265143.1013 68.76969502 Los Angeles (SC) 2022 LHD2 Aggregate Aggregate DSL 25927.3097 1067421.343 326132.9395 54.45422002 Los Angeles (SC) 2022 MCY Aggregate Aggregate GAS 177319.3254 1237635.154 354638.6508 34.66720507 Los Angeles (SC) 2022 MDV Aggregate Aggregate GAS 921693.6708 32233548.24 4274374.135 1629.222502 Los Angeles (SC) 2022 MDV Aggregate Aggregate DSL 19516.67089 771652.3864 96044.41776 28.70279505 Los Angeles (SC) 2022 MDV Aggregate Aggregate ELEC 7423.218148 250681.8433 37959.59904 0 Los Angeles (SC) 2022 MH Aggregate Aggregate GAS 18777.11371 190934.9774 1878.462455 37.17660803 Los Angeles (SC) 2022 MH Aggregate Aggregate DSL 5865.304828 61785.30748 586.5304828 5.859423982 Los Angeles (SC) 2022 Motor Coach Aggregate Aggregate DSL 676.2916755 91141.88557 9873.858462 13.99760817 Los Angeles (SC) 2022 OBUS Aggregate Aggregate GAS 3972.712037 163041.1007 79486.02243 32.64328018 Los Angeles (SC) 2022 PTO Aggregate Aggregate DSL 0 76505.4461 0 15.50775389 Los Angeles (SC) 2022 SBUS Aggregate Aggregate GAS 1378.869452 55608.41612 5515.47781 6.053496228 Los Angeles (SC) 2022 SBUS Aggregate Aggregate DSL 3460.157096 109535.682 39929.73315 14.35975618 Los Angeles (SC) 2022 T6 Ag Aggregate Aggregate DSL 12.10479957 101.9666453 53.26111809 0.012181572 Los Angeles (SC) 2022 T6 CAIRP heavy Aggregate Aggregate DSL 272.1638062 53846.97659 3973.591571 4.680155196 Los Angeles (SC) 2022 T6 CAIRP small Aggregate Aggregate DSL 144.6349106 7530.75419 2111.669694 0.699944378 Los Angeles (SC) 2022 T6 instate construction heavy Aggregate Aggregate DSL 2518.967495 168570.4564 11388.15411 16.56194729 Los Angeles (SC) 2022 T6 instate construction small Aggregate Aggregate DSL 8157.753968 433957.0754 36880.88852 42.40587222 Los Angeles (SC) 2022 T6 instate heavy Aggregate Aggregate DSL 10296.35106 1423092.141 118818.4637 128.9338909 Los Angeles (SC) 2022 T6 instate small Aggregate Aggregate DSL 37908.6179 1932060.83 437460.1947 186.9232192 Los Angeles (SC) 2022 T6 OOS heavy Aggregate Aggregate DSL 156.4590604 31080.56962 2284.302283 2.699014263 Los Angeles (SC) 2022 T6 OOS small Aggregate Aggregate DSL 83.58460294 4317.240411 1220.335203 0.401773955 Los Angeles (SC) 2022 T6 Public Aggregate Aggregate DSL 4445.935083 69430.49194 13486.00307 8.507368053 Los Angeles (SC) 2022 T6 utility Aggregate Aggregate DSL 996.7203316 16808.24099 11462.28381 1.735997959 Los Angeles (SC) 2022 T6TS Aggregate Aggregate GAS 14505.49561 793122.3284 290225.9562 157.2392835 Los Angeles (SC) 2022 T7 Ag Aggregate Aggregate DSL 5.193051548 102.8930892 22.84942681 0.01852168 Los Angeles (SC) 2022 T7 CAIRP Aggregate Aggregate DSL 6003.500987 1067306.387 87651.11441 155.0696328 Los Angeles (SC) 2022 T7 CAIRP construction Aggregate Aggregate DSL 671.4917023 121085.6232 3035.787878 16.55458348 Los Angeles (SC) 2022 T7 NNOOS Aggregate Aggregate DSL 6498.761345 1301079.701 94881.91563 179.099333 Los Angeles (SC) 2022 T7 NOOS Aggregate Aggregate DSL 2371.048773 419354.6563 34617.31208 62.47642547 Los Angeles (SC) 2022 T7 POLA Aggregate Aggregate DSL 8258.014728 1072153.038 62760.91194 188.7409496 Los Angeles (SC) 2022 T7 Public Aggregate Aggregate DSL 5475.906144 110937.1004 16610.24862 19.0808356 Los Angeles (SC) 2022 T7 Single Aggregate Aggregate DSL 5794.937297 385296.7187 66872.77297 58.88961274 Los Angeles (SC) 2022 T7 single construction Aggregate Aggregate DSL 4300.116371 300391.1598 19440.65893 44.46501106 Los Angeles (SC) 2022 T7 SWCV Aggregate Aggregate DSL 1379.990695 56384.18389 5381.963711 27.81339016 Los Angeles (SC) 2022 T7 SWCV Aggregate Aggregate NG 2623.533087 106827.7218 10231.77904 47.782843 Los Angeles (SC) 2022 T7 tractor Aggregate Aggregate DSL 12166.67647 1645420.533 154516.7912 230.7310322 Los Angeles (SC) 2022 T7 tractor construction Aggregate Aggregate DSL 3592.159925 247796.2601 16240.01536 37.46414496 Los Angeles (SC) 2022 T7 utility Aggregate Aggregate DSL 405.4684121 8232.431424 4662.886739 1.306947156 Los Angeles (SC) 2022 T7IS Aggregate Aggregate GAS 55.2683338 5768.621752 1105.808823 1.407168754 Los Angeles (SC) 2022 UBUS Aggregate Aggregate GAS 460.6006493 32989.32038 1842.402597 7.783285084 Los Angeles (SC) 2022 UBUS Aggregate Aggregate DSL 10.1389 1181.230112 40.5556 0.208547568 Los Angeles (SC) 2022 UBUS Aggregate Aggregate ELEC 12 1070.403311 48 0 Los Angeles (SC) 2022 UBUS Aggregate Aggregate NG 4129.345993 437121.0718 16517.38397 111.0876976 EMFAC Fuel Usage: Year 2022
Vehicle type GAS DSL NG
ELEC
VMT/day Gallons/day Miles/gallon VMT/day Gallons/day Miles/gallon VMT/day Gallons/day Miles/gallon VMT/day All other buses 0 0 0.00 148,348 14,082 10.53 0 0 0.00 0 LDA 149,418,106 4,801,115 31.12 1,426,245 29,363 48.57 0 0 0.00 3,806,342 LDT1 17,372,475 648,191 26.80 6,133 278 22.08 0 0 0.00 196,782 LDT2 52,162,943 2,069,800 25.20 404,272 11,313 35.74 0 0 0.00 584,569 LHD1 3,800,052 359,383 10.57 2,893,383 130,924 22.10 0 0 0.00 0 LHD2 625,879 67,954 9.21 1,126,544 56,597 19.90 0 0 0.00 0 MCY 1,265,085 35,455 35.68 0 0 0.00 0 0 0.00 0
MDV 32,264,362 1,576,940 20.46 823,486 29,770 27.66 0 0 0.00 342,100 MH 191,392 36,760 5.21 64,319 6,026 10.67 0 0 0.00 0
Motor coach 0 0 0.00 92,744 13,826 6.71 0 0 0.00 0
OBUS 159,343 31,499 5.06 0 0 0.00 0 0 0.00 0
PTO 0 0 0.00 77,199 14,935 5.17 0 0 0.00 0
SBUS 58,916 6,358 9.27 110,638 14,360 7.70 0 0 0.00 0
T6 797,300 155,868 5.12 4,246,866 386,115 11.00 0 0 0.00 0 T7 5,905 1,406 4.20 6,872,058 981,183 7.00 113,852 50,168 2.27 0 UBUS 33,184 7,630 4.35 1,181 209 5.66 439,713 111,745 3.93 1,070 Total 258,154,940 9,798,359 26.35 18,293,417 1,688,982 10.83 553,565 161,913 3.42 4,930,863 3,400,030,661

0.34%
81875000 11690001.06
Source: EMFAC2017 (v1.0.3) Emissions Inventory
Region Type: Sub-Area
Region: Los Angeles (SC)
Calendar Year: 2023
Season: Annual
Vehicle Classification: EMFAC2011 Categories
Units: miles/day for VMT, trips/day for Trips, tons/day for Emissions, 1000 gallons/day for Fuel Consumption Region Calendar Year Vehicle Category Model Year Speed Fuel Population VMT Trips Fuel Consumption Los Angeles (SC) 2023 All Other Buses Aggregate Aggregate DSL 2413.362241 148347.7525 20272.24282 14.0818541 Los Angeles (SC) 2023 LDA Aggregate Aggregate GAS 3986929.129 149418105.6 18815397.63 4801.114553 Los Angeles (SC) 2023 LDA Aggregate Aggregate DSL 36740.62878 1426244.815 174171.2985 29.36298643 Los Angeles (SC) 2023 LDA Aggregate Aggregate ELEC 91678.53845 3806341.937 457107.9273 0 Los Angeles (SC) 2023 LDT1 Aggregate Aggregate GAS 472375.6724 17372474.6 2187811.198 648.1906909 Los Angeles (SC) 2023 LDT1 Aggregate Aggregate DSL 252.4118747 6132.921962 894.9059766 0.277775308 Los Angeles (SC) 2023 LDT1 Aggregate Aggregate ELEC 4635.248736 196781.6242 23233.68477 0 Los Angeles (SC) 2023 LDT2 Aggregate Aggregate GAS 1397479.324 52162943.36 6567821.268 2069.799895 Los Angeles (SC) 2023 LDT2 Aggregate Aggregate DSL 9765.230182 404272.1374 48008.05802 11.31280557 Los Angeles (SC) 2023 LDT2 Aggregate Aggregate ELEC 18283.62829 584568.8418 92279.45183 0 Los Angeles (SC) 2023 LHD1 Aggregate Aggregate GAS 105195.9307 3800052.408 1567262.626 359.3833271 Los Angeles (SC) 2023 LHD1 Aggregate Aggregate DSL 68776.35703 2893383.107 865120.0508 130.9243641 Los Angeles (SC) 2023 LHD2 Aggregate Aggregate GAS 17937.98852 625878.5235 267249.3013 67.95438628 Los Angeles (SC) 2023 LHD2 Aggregate Aggregate DSL 27873.77545 1126544.027 350617.0299 56.59739854 Los Angeles (SC) 2023 MCY Aggregate Aggregate GAS 183955.3723 1265084.637 367910.7446 35.45479504 Los Angeles (SC) 2023 MDV Aggregate Aggregate GAS 931795.9713 32264362.15 4326648.043 1576.940395 Los Angeles (SC) 2023 MDV Aggregate Aggregate DSL 21297.50738 823486.0536 104465.3428 29.77006577 Los Angeles (SC) 2023 MDV Aggregate Aggregate ELEC 10378.92649 342100.1259 52903.33041 0 Los Angeles (SC) 2023 MH Aggregate Aggregate GAS 18786.35518 191391.548 1879.386973 36.76042896 Los Angeles (SC) 2023 MH Aggregate Aggregate DSL 6166.797629 64319.47927 616.6797629 6.026053915 Los Angeles (SC) 2023 Motor Coach Aggregate Aggregate DSL 658.0910352 92743.98303 9608.129114 13.82589661 Los Angeles (SC) 2023 OBUS Aggregate Aggregate GAS 3965.955178 159342.8081 79350.83121 31.49929974 Los Angeles (SC) 2023 PTO Aggregate Aggregate DSL 0 77198.6472 0 14.93547066 Los Angeles (SC) 2023 SBUS Aggregate Aggregate GAS 1481.565044 58916.21473 5926.260176 6.358131428 Los Angeles (SC) 2023 SBUS Aggregate Aggregate DSL 3497.078427 110638.3688 40355.80019 14.36000383 Los Angeles (SC) 2023 T6 Ag Aggregate Aggregate DSL 11.67476155 97.073849 51.36895084 0.011080203 Los Angeles (SC) 2023 T6 CAIRP heavy Aggregate Aggregate DSL 280.5602581 54871.42749 4096.179768 4.630891473 Los Angeles (SC) 2023 T6 CAIRP small Aggregate Aggregate DSL 147.0353228 7680.714425 2146.715713 0.690922567 Los Angeles (SC) 2023 T6 instate construction heavy Aggregate Aggregate DSL 2593.685207 170789.0459 11725.94998 16.01357351 Los Angeles (SC) 2023 T6 instate construction small Aggregate Aggregate DSL 7838.439815 439668.4712 35437.28165 40.85987457 Los Angeles (SC) 2023 T6 instate heavy Aggregate Aggregate DSL 10535.34865 1466280.47 121576.4628 127.6396288 Los Angeles (SC) 2023 T6 instate small Aggregate Aggregate DSL 37375.9816 1984183.072 431313.6457 183.0271301 Los Angeles (SC) 2023 T6 OOS heavy Aggregate Aggregate DSL 161.7713139 31697.11686 2361.861183 2.673821474 Los Angeles (SC) 2023 T6 OOS small Aggregate Aggregate DSL 84.77351604 4403.138169 1237.693334 0.39634697 Los Angeles (SC) 2023 T6 Public Aggregate Aggregate DSL 4479.460204 70241.70163 13587.69594 8.450363812 Los Angeles (SC) 2023 T6 utility Aggregate Aggregate DSL 1011.45952 16954.26417 11631.78448 1.721713991 Los Angeles (SC) 2023 T6TS Aggregate Aggregate GAS 14623.10816 797300.0842 292579.148 155.8676623 Los Angeles (SC) 2023 T7 Ag Aggregate Aggregate DSL 5.450542727 89.56607012 23.982388 0.015745035 Los Angeles (SC) 2023 T7 CAIRP Aggregate Aggregate DSL 5967.126018 1085857.383 87120.03986 152.0768811 Los Angeles (SC) 2023 T7 CAIRP construction Aggregate Aggregate DSL 672.7726984 122679.2552 3041.579212 16.23989484 Los Angeles (SC) 2023 T7 NNOOS Aggregate Aggregate DSL 6698.602472 1323677.931 97799.59609 176.2912352 Los Angeles (SC) 2023 T7 NOOS Aggregate Aggregate DSL 2364.918201 426649.092 34527.80573 61.26348855 Los Angeles (SC) 2023 T7 POLA Aggregate Aggregate DSL 8486.558826 1131828.731 64497.84707 175.4952223 Los Angeles (SC) 2023 T7 Public Aggregate Aggregate DSL 5541.588258 112265.4557 16809.48436 19.02171313 Los Angeles (SC) 2023 T7 Single Aggregate Aggregate DSL 5934.360332 388787.818 68481.69547 56.1742218 Los Angeles (SC) 2023 T7 single construction Aggregate Aggregate DSL 4385.71399 304344.6678 19827.64243 42.88123171 Los Angeles (SC) 2023 T7 SWCV Aggregate Aggregate DSL 1255.519365 51298.487 4896.525523 25.30419893 Los Angeles (SC) 2023 T7 SWCV Aggregate Aggregate NG 2795.817267 113851.643 10903.68734 50.16782394 Los Angeles (SC) 2023 T7 tractor Aggregate Aggregate DSL 12205.73158 1665217.666 155012.7911 219.5996373 Los Angeles (SC) 2023 T7 tractor construction Aggregate Aggregate DSL 3685.502446 251057.5562 16662.01327 35.5101791 Los Angeles (SC) 2023 T7 utility Aggregate Aggregate DSL 409.1727144 8303.947199 4705.486215 1.309375599 Los Angeles (SC) 2023 T7IS Aggregate Aggregate GAS 52.86814563 5904.510911 1057.785858 1.405502268 Los Angeles (SC) 2023 UBUS Aggregate Aggregate GAS 463.3229945 33183.96593 1853.291978 7.630187276 Los Angeles (SC) 2023 UBUS Aggregate Aggregate DSL 10.1389 1181.230112 40.5556 0.208547568 Los Angeles (SC) 2023 UBUS Aggregate Aggregate ELEC 12 1070.403311 48 0 Los Angeles (SC) 2023 UBUS Aggregate Aggregate NG 4153.840831 439713.4848 16615.36332 111.7447779 EMFAC Fuel Usage: Year 2023
Vehicle type GAS DSL NG
ELEC
VMT/day Gallons/day Miles/gallon VMT/day Gallons/day Miles/gallon VMT/day Gallons/day Miles/gallon VMT/day All other buses 0 0 0.00 10,617 951 11.16 0 0 0.00 0
LDA 24,478,837 721,471 33.93 263,556 4,810 54.80 0 0 0.00 585,973 LDT1 2,347,037 81,177 28.91 534 20 26.67 0 0 0.00 27,901 LDT2 7,375,146 266,553 27.67 56,317 1,356 41.53 0 0 0.00 82,985 LHD1 481,214 43,424 11.08 516,977 24,028 21.52 0 0 0.00 0 LHD2 72,284 7,458 9.69 201,738 10,267 19.65 0 0 0.00 0
MCY 177,526 4,688 37.87 0 0 0.00 0 0 0.00 0
MDV 5,478,215 250,698 21.85 149,588 4,923 30.38 0 0 0.00 53,455 MH 34,330 6,493 5.29 14,833 1,344 11.04 0 0 0.00 0
Motor coach 0 0 0.00 5,801 817 7.10 0 0 0.00 0
OBUS 14,690 2,754 5.33 0 0 0.00 0 0 0.00 0
PTO 0 0 0.00 44,321 8,231 5.38 0 0 0.00 0
SBUS 15,095 1,692 8.92 28,336 3,643 7.78 0 0 0.00 0
T6 56,942 10,447 5.45 757,769 63,999 11.84 0 0 0.00 0
T7 477 107 4.47 1,990,376 257,897 7.72 13,507 5,508 2.45 0 UBUS 23,428 3,649 6.42 12 1 9.31 27,220 6,438 4.23 1
Total 40,555,220 1,400,612 28.96 4,040,774 382,287 10.57 40,728 11,947 3.41 750,315 486,012,369

2.18%
81875000 10608708.92
Source: EMFAC2017 (v1.0.3) Emissions Inventory
Region Type: Sub-Area
Region: Riverside (SC)
Calendar Year: 2024
Season: Annual
Vehicle Classification: EMFAC2011 Categories
Units: miles/day for VMT, trips/day for Trips, tons/day for Emissions, 1000 gallons/day for Fuel Consumption Region Calendar Year Vehicle Category Model Year Speed Fuel Population VMT Trips Fuel Consumption Riverside (SC) 2024 All Other Buses Aggregate Aggregate DSL 186.6469617 10617.02237 1567.834478 0.951083116 Riverside (SC) 2024 LDA Aggregate Aggregate GAS 617514.3579 24478836.56 2921789.652 721.470804 Riverside (SC) 2024 LDA Aggregate Aggregate DSL 6395.726935 263555.9906 30567.96518 4.809813607 Riverside (SC) 2024 LDA Aggregate Aggregate ELEC 14425.0696 585972.9711 72164.24752 0 Riverside (SC) 2024 LDT1 Aggregate Aggregate GAS 63219.76211 2347037.162 289438.0097 81.17710169 Riverside (SC) 2024 LDT1 Aggregate Aggregate DSL 24.10721025 533.616122 80.30352254 0.020009633 Riverside (SC) 2024 LDT1 Aggregate Aggregate ELEC 661.8262843 27901.35626 3349.231994 0 Riverside (SC) 2024 LDT2 Aggregate Aggregate GAS 191595.1165 7375145.522 898075.5151 266.5528329 Riverside (SC) 2024 LDT2 Aggregate Aggregate DSL 1293.932614 56317.20384 6361.076033 1.356033097 Riverside (SC) 2024 LDT2 Aggregate Aggregate ELEC 2788.874311 82984.78588 14057.46342 0 Riverside (SC) 2024 LHD1 Aggregate Aggregate GAS 15013.79924 481213.6981 223683.2382 43.42353163 Riverside (SC) 2024 LHD1 Aggregate Aggregate DSL 15906.59016 516976.9352 200084.8937 24.02819078 Riverside (SC) 2024 LHD2 Aggregate Aggregate GAS 2255.583712 72284.45286 33604.83649 7.458415808 Riverside (SC) 2024 LHD2 Aggregate Aggregate DSL 6233.384608 201737.9091 78408.13677 10.26708544 Riverside (SC) 2024 MCY Aggregate Aggregate GAS 28768.15998 177525.5663 57536.31996 4.688277597 Riverside (SC) 2024 MDV Aggregate Aggregate GAS 154289.1501 5478215.24 706842.2487 250.6982454 Riverside (SC) 2024 MDV Aggregate Aggregate DSL 3716.540326 149587.74 17947.53147 4.923362916 Riverside (SC) 2024 MDV Aggregate Aggregate ELEC 1759.655155 53454.88255 8929.865345 0 Riverside (SC) 2024 MH Aggregate Aggregate GAS 4447.773714 34330.11049 444.9552824 6.493354428 Riverside (SC) 2024 MH Aggregate Aggregate DSL 1971.591273 14832.52594 197.1591273 1.343822937 Riverside (SC) 2024 Motor Coach Aggregate Aggregate DSL 41.66717465 5801.444675 608.3407499 0.816676557 Riverside (SC) 2024 OBUS Aggregate Aggregate GAS 436.1488407 14690.22853 8726.466005 2.754009451 Riverside (SC) 2024 PTO Aggregate Aggregate DSL 0 44320.51384 0 8.231074899 Riverside (SC) 2024 SBUS Aggregate Aggregate GAS 439.6915571 15094.65462 1758.766228 1.692046723 Riverside (SC) 2024 SBUS Aggregate Aggregate DSL 894.0425814 28336.36505 10317.12744 3.642655698 Riverside (SC) 2024 T6 Ag Aggregate Aggregate DSL 3.9383837 51.75334321 17.32888828 0.005409636 Riverside (SC) 2024 T6 CAIRP heavy Aggregate Aggregate DSL 49.73399344 9550.295224 726.1163042 0.731860052 Riverside (SC) 2024 T6 CAIRP small Aggregate Aggregate DSL 24.96534236 1268.079315 364.4939984 0.104950477 Riverside (SC) 2024 T6 instate construction heavy Aggregate Aggregate DSL 718.0278456 46818.84183 3246.175973 4.060184428 Riverside (SC) 2024 T6 instate construction small Aggregate Aggregate DSL 1329.827221 73074.30684 6012.097161 6.278103945 Riverside (SC) 2024 T6 instate heavy Aggregate Aggregate DSL 1955.847622 252286.4697 22570.2104 20.3587064 Riverside (SC) 2024 T6 instate small Aggregate Aggregate DSL 7155.65398 357211.5975 82575.25483 30.70294593 Riverside (SC) 2024 T6 OOS heavy Aggregate Aggregate DSL 27.82709184 5323.550954 406.2755409 0.408378013 Riverside (SC) 2024 T6 OOS small Aggregate Aggregate DSL 14.50505463 733.2068189 211.7737976 0.060718604 Riverside (SC) 2024 T6 Public Aggregate Aggregate DSL 572.8870163 8644.463881 1737.757281 1.025146392 Riverside (SC) 2024 T6 utility Aggregate Aggregate DSL 168.0721872 2806.151619 1932.830153 0.262543169 Riverside (SC) 2024 T6TS Aggregate Aggregate GAS 1398.543137 56941.89869 27982.05108 10.44742239 Riverside (SC) 2024 T7 Ag Aggregate Aggregate DSL 11.02709983 81.84916247 48.51923924 0.014933858 Riverside (SC) 2024 T7 CAIRP Aggregate Aggregate DSL 1645.805361 299560.044 24028.75827 39.14777377 Riverside (SC) 2024 T7 CAIRP construction Aggregate Aggregate DSL 184.0292624 33630.38079 831.9891402 4.15338895 Riverside (SC) 2024 T7 NNOOS Aggregate Aggregate DSL 1884.35287 365176.1496 27511.5519 45.14141174 Riverside (SC) 2024 T7 NOOS Aggregate Aggregate DSL 654.0349978 117689.7529 9548.910967 15.80270964 Riverside (SC) 2024 T7 POLA Aggregate Aggregate DSL 2361.768314 322447.2538 17949.43919 43.89630122 Riverside (SC) 2024 T7 Public Aggregate Aggregate DSL 772.9859549 15672.22522 2344.724061 2.577420553 Riverside (SC) 2024 T7 Single Aggregate Aggregate DSL 3081.23414 223206.9666 35557.01478 29.31439017 Riverside (SC) 2024 T7 single construction Aggregate Aggregate DSL 1193.602479 83430.7891 5396.2304 11.02968579 Riverside (SC) 2024 T7 SWCV Aggregate Aggregate DSL 58.81650987 2403.147296 229.3843885 1.186225468 Riverside (SC) 2024 T7 SWCV Aggregate Aggregate NG 332.158218 13507.35785 1295.41705 5.508111343 Riverside (SC) 2024 T7 tractor Aggregate Aggregate DSL 3482.41357 455986.8217 44226.65233 56.14184556 Riverside (SC) 2024 T7 tractor construction Aggregate Aggregate DSL 1010.739777 68823.05569 4569.515232 9.153884138 Riverside (SC) 2024 T7 utility Aggregate Aggregate DSL 111.7721205 2267.75523 1285.379386 0.337087411 Riverside (SC) 2024 T7IS Aggregate Aggregate GAS 6.027894532 477.2704955 120.6061138 0.106770859 Riverside (SC) 2024 UBUS Aggregate Aggregate GAS 166.3958246 23427.66786 665.5832982 3.649202734 Riverside (SC) 2024 UBUS Aggregate Aggregate DSL 0.141961099 11.67769301 0.567844395 0.001254697 Riverside (SC) 2024 UBUS Aggregate Aggregate ELEC 0.058469431 1.251702935 0.233877724 0 Riverside (SC) 2024 UBUS Aggregate Aggregate NG 207.5051617 27220.24364 830.0206468 6.438402902 EMFAC Fuel Usage: Year 2024
Vehicle type GAS DSL NG
Operation-Related Vehicle Fuel/Energy Usage
Proposed Project -- Passenger Vehicles
VMT Gallons VMT Gallons VMT Gallons VMT kWh
All 5,451,955 193,685 120,266 7,308 1,085 330 107,211 34,971 Total 5,451,955 193,685 120,266 7,308 1,085 330 107,211 34,971

MODIFIED PROJECT COMMUTE
Vehicle Type Gas Diesel Electricity CNG
Proposed Project
Vehicle type
Apartments Mid-Rise Regional Shopping Center
High Turnover (Sit
Down Restaurant)
Apartments MidRise Regional Shopping Center High Turnover (Sit Down Restaurant) Total LDA 64.43% 54.48% 54.48% 2,754,750 554,022 211,239 3,520,011LDT1 7.43% 6.28% 6.28% 317,774 63,910 24,368 406,051LDT2 22.17% 18.75% 18.75% 947,998 190,657 72,694 1,211,349MDV 2.00% 12.72% 12.72% 85,516 129,392 49,335 264,244LHD1 0.45% 2.31% 2.31% 19,083 23,480 8,953 51,516LHD2 0.12% 0.61% 0.61% 5,028 6,186 2,359 13,573MHD 0.20% 1.05% 1.05% 8,659 10,653 4,062 23,373HHD 0.15% 0.80% 0.80% 6,623 8,148 3,107 17,878OBUS 0.00% 0.09% 0.09% 0 941 359 1,299UBUS 0.00% 0.06% 0.06% 0 621 237 858MCY 2.97% 2.44% 2.44% 127,013 24,808 9,459 161,279SBUS 0.01% 0.07% 0.07% 577 710 271 1,558MH 0.07% 0.34% 0.34% 2,788 3,431 1,308 7,527 100.00% 100.00% 100.00% 4,275,809 1,016,956 387,748 5,680,513 Vehicle type Gas percent Diesel percent CNG percent Electricity percent LDA 96.62% 0.92% 0.00% 2.46%LDT1 98.85% 0.03% 0.00% 1.12%LDT2 98.14% 0.76% 0.00% 1.10%MDV 96.51% 2.46% 0.00% 1.02%LHD1 56.77% 43.23% 0.00% 0.00%LHD2 35.72% 64.28% 0.00% 0.00%MHD 15.81% 84.19% 0.00% 0.00% << Equal to T6 (https://www.arb.ca.gov/msei/downloads/emfac2014/emfac2014-vol3-technical-documentation-052015.pdf) HHD 0.08% 98.29% 1.63% 0.00% << Equal to T7 (https://www.arb.ca.gov/msei/downloads/emfac2014/emfac2014-vol3-technical-documentation-052015.pdf)OBUS 39.79% 60.21% 0.00% 0.00% << Motor coach, all other buses, and OBUS (https://www.arb.ca.gov/msei/downloads/emfac2014/emfac2014-vol3-technical-documentation-052015.pdf)UBUS 6.98% 0.25% 92.54% 0.23%MCY 100.00% 0.00% 0.00% 0.00%SBUS 34.75% 65.25% 0.00% 0.00%MH 74.85% 25.15% 0.00% 0.00% VMT mpg Gallons VMT mpg Gallons VMT mpg Gallons VMT m/kWh kWh LDA 3,400,912 31.12 109,278 32,463 48.57 668 0 0.00 0 86,636 3.07 28,260LDT1 401,363 26.80 14,975 142 22.08 6 0 0.00 0 4,546 3.07 1,483LDT2 1,188,813 25.20 47,172 9,214 35.74 258 0 0.00 0 13,323 3.07 4,346MDV 255,030 20.46 12,465 6,509 27.66 235 0 0.00 0 2,704 3.07 882LHD1 29,247 10.57 2,766 22,269 22.10 1,008 0 0.00 0 0 3.07 0LHD2 4,848 9.21 526 8,726 19.90 438 0 0.00 0 0 3.07 0MHD 3,694 5.12 722 19,678 11.00 1,789 0 0.00 0 0 3.07 0HHD 15 4.20 4 17,572 7.00 2,509 291 2.27 128 0 3.07 0OBUS 517 5.06 102 782 9.06 86 0 0.00 0 0 3.07 0UBUS 60 4.35 14 2 5.66 0 794 3.93 202 2 3.07 0MCY 161,279 35.68 4,520 0 0.00 0 0 0.00 0 0 3.07 0SBUS 541 9.27 58 1,016 7.70 132 0 0.00 0 0 3.07 0MH 5,634 5.21 1,082 1,893 10.67 177 0 0.00 0 0 3.07 0 5,451,955 193,685 120,266 7,308 1,085 330 107,211 34,971

PROPOSED CONDITIONSPROPOSED CONDITIONS
Vehicle type Gasoline Diesel Electricity

PROPOSED CONDITIONS
CNG
Fleet percent VMT

THE MERCURY PROJECT - INITIAL STUDY

CITY OF PICO RIVERA
Appendix
PlaceWorks
Appendix B Geotechnical Engineering Investigation

THE MERCURY PROJECT - INITIAL STUDY

CITY OF PICO RIVERA
Appendix
July 2022
This page intentionally left blank.

GEOTECHNICAL

ENGINEERING INVESTIGATION

PROPOSED MIXED-USE BUILDING
8825 WASHINGTON BOULEVARD

PICO RIVERA, CALIFORNIA
SALEM PROJECT NO. 3-220-0499
JULY 31, 2020
PREPARED FOR:

MR. JEROME MICKELSON
OPTIMUS PROPERTIES, INC.
1891 CENTURY PARK EAST, SUITE 2100
LOS ANGELES, CA 90067
PREPARED BY:

SALEM ENGINEERING GROUP, INC.
8711 MONROE COURT, SUITE A
RANCHO CUCAMONGA, CA 91730
P: (909) 980-6455
F: (909) 980-6435
www.salem.net
SAN JOSE ▪ STOCKTON ▪ FRESNO ▪ BAKERSFIELD ▪ RANCHO CUCAMONGA GEOTECHNICAL ● ENV
DALLAS, TEXAS ▪ DENVER, COLORADO ▪ CHARLESTON, SOUTH CAROLINA IRONMENTAL ● GEOLOGY ● MATERIALS TESTING & INSPECTION ● FORENSIC ● LABORATORY 8711 Monroe Court, Suite A
Rancho Cucamonga, CA 91730
Phone (909) 980-6455
Fax (909) 980-6435
SAN JOSE ▪ STOCKTON ▪ FRESNO ▪ BAKERSFIELD ▪ RANCHO CUCAMONGA DALLAS, TX ▪ DENVER, CO ▪ CHARLESTON, SC
July 31, 2020 Project No. 3-220-0499
Mr. Jerome Mickelson
Executive Vice President
Optimus Properties, Inc.
1801 Century Park East, Suite 2100
Los Angeles, CA 90067
SUBJECT: GEOTECHNICAL ENGINEERING INVESTIGATION

PROPOSED MIXED-USE BUILDING
8825 WASHINGTON BOULEVARD

PICO RIVERA, CALIFORNIA
Dear Mr. Mickelson:

At your request and authorization, SALEM Engineering Group, Inc. (SALEM) has prepared this Geotechnical Engineering Investigation report for the Proposed Mixed-Use Building to be located at the subject site.

The accompanying report presents our findings, conclusions, and recommendations regarding the geotechnical aspects of designing and constructing the project as presently proposed. In our opinion, the proposed project is feasible from a geotechnical viewpoint provided our recommendations are incorporated into the design and construction of the project.

We appreciate the opportunity to assist you with this project. Should you have questions regarding this report or need additional information, please contact the undersigned at (909) 980-6455.

Respectfully Submitted,
SALEM ENGINEERING GROUP, INC.

Clarence Jiang, GE R. Sammy Salem, MS, PE, GE
Senior Geotechnical Engineer Principal Engineer
RGE 2477 RCE 52762 / RGE 2549

TABLE OF CONTENTS

1. PURPOSE AND SCOPE..................................................................................................... 1

2. PROJECT DESCRIPTION.................................................................................................. 1

3. SITE LOCATION AND DESCRIPTION ........................................................................... 2

4. FIELD EXPLORATION..................................................................................................... 2

5. LABORATORY TESTING ................................................................................................ 3

6. GEOLOGIC SETTING ....................................................................................................... 3

7. GEOLOGIC HAZARDS..................................................................................................... 3

7.1 Faulting and Seismicity ..........................................................................................................3

7.2 Surface Fault Rupture .............................................................................................................4

7.3 Ground Shaking......................................................................................................................4

7.4 Liquefaction............................................................................................................................5

7.5 Lateral Spreading....................................................................................................................5

7.6 Landslides...............................................................................................................................5

7.7 Tsunamis and Seiches.............................................................................................................5

8. SOIL AND GROUNDWATER CONDITIONS ................................................................. 6

8.1 Subsurface Conditions............................................................................................................6

8.2 Groundwater...........................................................................................................................6

8.3 Soil Corrosion Screening........................................................................................................6

8.4 Percolation Testing.................................................................................................................7

9. CONCLUSIONS AND RECOMMENDATIONS............................................................... 8

9.1 General ...................................................................................................................................8

9.2 Seismic Design Criteria ........................................................................................................10

9.3 Soil and Excavation Characteristics......................................................................................11

9.4 Materials for Fill...................................................................................................................11

9.5 Grading.................................................................................................................................12

9.6 Option 1 - Shallow Foundations and Slabs with Geogrid......................................................14

9.7 Option 2 – Structural Slabs...................................................................................................18

9.8 Lateral Earth Pressures and Frictional Resistance .................................................................19

9.9 Retaining Walls....................................................................................................................20

9.10 Temporary Excavations........................................................................................................21

9.11 Temporary Soldier Pile Shoring System...............................................................................22

9.12 Underground Utilities...........................................................................................................23

9.13 Surface Drainage ..................................................................................................................23

9.14 Pavement Design ..................................................................................................................24

10. PLAN REVIEW, CONSTRUCTION OBSERVATION AND TESTING........................ 24

10.1 Plan and Specification Review..............................................................................................24

10.2 Construction Observation and Testing Services....................................................................24

11. LIMITATIONS AND CHANGED CONDITIONS .......................................................... 25 TABLE OF CONTENTS (cont.)

FIGURES
Figure 1, Vicinity Map
Figure 2, Site Plan
APPENDIX A – FIELD INVESTIGATION
Figures A-1 through A-6, Logs of Exploratory Soil Borings B-1 through B-6 Percolation Tests, P-1 through P-3
Liquefaction Analysis Reports
APPENDIX B – LABORATORY TESTING
Consolidation Test Results
Direct Shear Test Results
Gradation Curves
Corrosivity Test Results
Maximum Density and Optimum Moisture Proctor Test Results APPENDIX C – EARTHWORK AND PAVEMENT SPECIFICATIONS
8711 Monroe Court, Suite A
Rancho Cucamonga, CA 91730
Phone (909) 980-6455
Fax (909) 980-6435
Project No. 3-220-0499 - 1 -

GEOTECHNICAL ENGINEERING INVESTIGATION

PROPOSED MIXED-USE BUILDING
8825 WASHINGTON BOULEVARD

PICO RIVERA, CALIFORNIA

1. PURPOSE AND SCOPE
This report presents the results of our Geotechnical Engineering Investigation for the Proposed MixedUse Building to be located at 8825 Washington Boulevard in Pico Rivera, California (see Figure 1, Vicinity Map).

The purpose of our geotechnical engineering investigation was to observe and sample the subsurface conditions encountered at the site, and provide conclusions and recommendations relative to the geotechnical aspects of constructing the project as presently proposed. The scope of this investigation included a field exploration, laboratory testing, engineering analysis and the preparation of this report. Our field exploration was performed on July 7 and 8, 2020 and included the drilling of six (6) small-diameter soil borings to a maximum depth of 51½ feet at the site. Additionally, three (3) percolation tests were conducted at a depth of approximately 15 feet below ground surface. The locations of the soil borings and percolation tests are depicted on Figure 2, Site Plan. A detailed discussion of our field investigation, exploratory boring logs are presented in Appendix A.

Laboratory tests were performed on selected soil samples obtained during the investigation to evaluate pertinent physical properties for engineering analyses. Appendix B presents the laboratory test results in tabular and graphic format.

The recommendations presented herein are based on analysis of the data obtained during the investigation and our experience with similar soil and geologic conditions. If project details vary significantly from those described herein, SALEM should be contacted to determine the necessity for review and possible revision of this report.

Earthwork and Pavement Specifications are presented in Appendix C. If text of the report conflict with the specifications in Appendix C, the recommendations in the text of the report have precedence.

2. PROJECT DESCRIPTION
Based on the information provided to us, we understand the proposed development of the site will include demolition of a 34,445 square-foot restaurant building and construction of a mixed use, 6 story, 255-unit wrap-apartment with 7 levels of parking (1 level underground) and ±5,000 square feet of ground level retail spaces. The building also includes one level of underground public self-storage (±23,000 square feet) with a separate entrance. Maximum wall load is expected to be 30 kips per linear foot. Maximum column load is expected to be 500 kips. Floor slab soil bearing pressure is expected to be 150 psf.

Project No. 3-220-0499 - 2 -
A site grading plan was not available at the time of preparation of this report. As the site area is essentially level, we anticipate that cuts and fills during earthwork will be minimal and limited to providing level pads and positive site drainage. In the event that changes occur in the nature or design of the project, the conclusions and recommendations contained in this report will not be considered valid unless the changes are reviewed and the conclusions of our report are modified. The site configuration and locations of proposed improvements are shown on the Site Plan, Figure 2.

3. SITE LOCATION AND DESCRIPTION
The project site encompasses approximately 2.6 acres and is located within the southwest portion of the Pico Rivera Marketplace which is situated at the northwest corner of Washington Boulevard and Rosemead Boulevard in the City of Pico Rivera, California (see Vicinity Map, Figure 1).

The site is currently occupied by a vacant restaurant building (8825 Washington Blvd) with paved parking and landscaping. The landscaping includes palm trees that are up to 50 feet tall.

At the time of our field exploration, a 4 to 5 foot deep trench with miscellaneous debris was present to the southwest of the vacant building. Excavated soils were stockpiled along the trench. Mounds of soil and debris were present directly west of the vacant building and at the westernmost portion of the site.

The site is relatively flat with no major changes in grade and has an average elevation of approximately 165 feet above mean sea level based on Google Earth imagery.

4. FIELD EXPLORATION
Our field exploration consisted of site surface reconnaissance and subsurface exploration. The exploratory test borings (B-1 through B-6) were drilled on July 7 and 8, 2020 in the area shown on the Site Plan, Figure 2. The test borings were advanced with 6-inch diameter solid flight augers rotated by a truck-mounted CME 55 drill rig. The test borings were extended to a maximum depth of approximately 51½ feet below existing grade.

The materials encountered in the test borings were visually classified in the field, and logs were recorded by a field engineer and stratification lines were approximated on the basis of observations made at the time of drilling. Visual classification of the materials encountered in the test borings were generally made in accordance with the Unified Soil Classification System (ASTM D2487).

A soil classification chart and key to sampling is presented on the Unified Soil Classification Chart, in Appendix "A." The logs of the test borings are presented in Appendix "A." The Boring Logs include the soil type, color, moisture content, dry density, and the applicable Unified Soil Classification System symbol.

The location of the test borings were determined by measuring from features shown on the Site Plan, provided to us. Hence, accuracy can be implied only to the degree that this method warrants.

The actual boundaries between different soil types may be gradual and soil conditions may vary. For a more detailed description of the materials encountered, the Boring Logs in Appendix "A" should be consulted. Soil samples were obtained from the test borings at the depths shown on the logs of borings.

The MCS samples were recovered and capped at both ends to preserve the samples at their natural moisture content; SPT samples were recovered and placed in a sealed bag to preserve their natural moisture content. The borings were backfilled with soil cuttings after completion of the drilling.

Project No. 3-220-0499 - 3 -

5. LABORATORY TESTING
Laboratory tests were performed on selected soil samples to evaluate their physical characteristics and engineering properties. The laboratory-testing program was formulated with emphasis on the evaluation of natural moisture, density, shear strength, consolidation potential, expansion, maximum density and optimum moisture determination, and gradation of the materials encountered.

In addition, chemical tests were performed to evaluate the corrosivity of the soils to buried concrete and metal. Details of the laboratory test program and the results of laboratory test are summarized in Appendix "B." This information, along with the field observations, was used to prepare the final boring logs in Appendix "A."

6. GEOLOGIC SETTING
The subject site is located in an area termed the central plain of the Los Angeles Basin between the Los Angeles River and San Gabriel River within the Peninsular Range of Southern California. This plain has been formed by deposition of alluvium within the flood plain of the Rio Hondo and San Gabriel River which flow generally southward from the hills and mountains to the north. Published reports indicate that the Quaternary Age alluvium is from 600 to 800 feet thick in the area, and is underlain by Tertiary Age marine sedimentary rocks several thousand feet in thickness. These deposits are generally fine to coarse grained, consisting primarily of mixtures of gravel, sand, and silt of valleys and floodplains. Tectonism of the region is dominated by the interaction of the East Pacific Plate and the North American Plate along a transform boundary. Deposits encountered on the subject site during exploratory drilling are discussed in detail in this report.

7. GEOLOGIC HAZARDS

7.1 Faulting and Seismicity
Based on the proximity of several dominant active faults and seismogenic structures, as well as the historic seismic record, the area of the subject site is considered subject to relatively high seismic activity.

The seismic hazard most likely to impact the site is ground-shaking due to a large earthquake on one of the major active regional faults. Moderate to large earthquakes have affected the area of the subject site within historic time.

The project area is not within an Alquist-Priolo Earthquake Fault (Special Studies) Zone and will not require a special site investigation by an Engineering Geologist. Soils on site are classified as Site Class D in accordance with Chapter 16 of the California Building Code. The proposed structures are determined to be in Seismic Design Category D.

To determine the distance of known active faults within 100 miles of the site, we used the United States Geological Survey (USGS) web-based application 2008 National Seismic Hazard Maps - Fault Parameters.

Site latitude is 33.9847° north; site longitude is 118.0984° west. The ten closest active faults are summarized below in Table 7.1.

Project No. 3-220-0499 - 4 -
TABLE 7.1

REGIONAL FAULT SUMMARY
Fault Name
Distance
to Site
(miles)
Maximum
Earthquake
Magnitude, Mw
Puente Hills (LA) 2.0 7.0
Elsinore; W+GI+T+J+CM 2.9 7.9
Puente Hills (Santa Fe Springs) 4.9 6.7
Elysian Park (Upper) 5.6 6.7
Puente Hills (Coyote Hills) 7.1 6.9
Raymond 9.4 6.8
Verdugo 10.6 6.9
Newport-Inglewood Connected alt 2 11.5 7.5
Newport-Inglewood Connected alt 1 11.8 7.5
Hollywood 12.0 6.7
The faults tabulated above and numerous other faults in the region are sources of potential ground motion. However, earthquakes that might occur on other faults throughout California are also potential generators of significant ground motion and could subject the site to intense ground shaking.

7.2 Surface Fault Rupture
The site is not within a currently established State of California Earthquake Fault Zone for surface fault rupture hazards. No active faults with the potential for surface fault rupture are known to pass directly beneath the site. Therefore, the potential for surface rupture due to faulting occurring beneath the site during the design life of the proposed development is considered low.

7.3 Ground Shaking
Seismic coefficients and spectral response acceleration values were developed based on the 2019 California Building Code CBC). The CBC methodology for determining design ground motion values is based on the Office of Statewide Health Planning and Development (OHSPD) Seismic Design Maps, which incorporate both probabilistic and deterministic seismic ground motion.

Based on the 2019 CBC, a Site Class D represents the on-site soil conditions with standard penetration resistance, N-values, averaging between 15 and 50 blows per foot in the upper 100 feet below site grade. A table providing the recommended design acceleration parameters of the project site, based on a Site Class D designation, is included in Section 9.2.1 of this report.

Based on the Office of Statewide Health Planning and Development (OSHPD) Seismic Design Maps, the estimated design peak ground acceleration adjusted for site class effects (PGAM) was determined to be

0.869g (based on both probabilistic and deterministic seismic ground motion).

Project No. 3-220-0499 - 5 -

7.4 Liquefaction
Soil liquefaction is a state of soil particles suspension caused by a complete loss of strength when the effective stress drops to zero. Liquefaction normally occurs under saturated conditions in soils such as sand in which the strength is purely frictional. Primary factors that trigger liquefaction are: moderate to strong ground shaking (seismic source), relatively clean, loose granular soils (primarily poorly graded sands and silty sands), and saturated soil conditions (shallow groundwater). Due to the increasing overburden pressure with depth, liquefaction of granular soils is generally limited to the upper 50 feet of a soil profile.

Groundwater was not encountered during our investigation. Based on the State of California Seismic Hazard Zone Report 037, Whittier Quadrangle, Plate 1.2, Open-File Report 98-28, the historically highest groundwater is at a depth of approximately 15 feet below ground surface.

The soils encountered within the depth of 51½ feet on the project site consisted predominately of loose to very dense silty sand, well-graded sand, well-graded sand with silt, poorly graded sand, and poorly graded sand with silt; and soft to stiff silt, sandy silt, and sandy clay. Low to very low cohesion strength is associated with the sandy soil. A seismic hazard, which could cause damage to the proposed development during seismic shaking, is the post-liquefaction settlement of the liquefied sands.

Based on the State of California, Seismic Hazard Zone Map, Whittier Quadrangle, Dated March 25, 1999, the site is located within a liquefaction potential zone. The potential for soil liquefaction during a seismic event was evaluated using LiqIT computer program (version 4.7.5) developed by GeoLogismiki of Greece.

For the analysis, a maximum earthquake magnitude of 7.9 Mw, a peak horizontal ground surface acceleration of 0.87g (with a 2% probability of exceedance in 50 years) and a groundwater depth of 15 feet were considered appropriate for the liquefaction analysis. The liquefaction analysis indicated that the site soils had a low potential for liquefaction under seismic conditions. The total liquefaction-induced settlements were calculated to be 2.34 to 3.87 inches. The liquefaction analysis report is included in Appendix A.

7.5 Lateral Spreading
Lateral spreading is a phenomenon in which soils move laterally during seismic shaking and is often associated with liquefaction. The amount of movement depends on the soil strength, duration and intensity of seismic shaking, topography, and free face geometry. Due to the relatively flat site topography, we judge the likelihood of lateral spreading to be low.

7.6 Landslides
There are no known landslides at the site, nor is the site in the path of any known or potential landslides.

We do not consider the potential for a landslide to be a hazard to this project.

7.7 Tsunamis and Seiches
The site is not located within a coastal area. Therefore, tsunamis (seismic sea waves) are not considered a significant hazard at the site. Seiches are large waves generated in enclosed bodies of water in response to ground shaking. No major water-retaining structures are located immediately up gradient from the project site. Flooding from a seismically-induced seiche is considered unlikely.

Project No. 3-220-0499 - 6 -

8. SOIL AND GROUNDWATER CONDITIONS

8.1 Subsurface Conditions
The subsurface conditions encountered appear typical of those found in the geologic region of the site. In general, the soils within the depth of exploration consisted predominately of loose to very dense silty sand, well-graded sand, well-graded sand with silt, poorly graded sand, and poorly graded sand with silt; and soft to stiff silt, sandy silt, and sandy clay. The pavement within our test borings consisted of approximately 4 inches of asphalt concrete (AC) underlain by approximately 0 to 3 inches of aggregate base (AB). A layer of geofabric (Petromat) was encountered within the AC.

Fill soils are anticipated to be present onsite between our test boring locations since the site was previously graded for the current development. Verification of the extent of fill should be determined during site grading. Field and laboratory tests suggest that the deeper native soils are moderately strong and slightly compressible. These soils extended to the termination depth of our borings.

The soils were classified in the field during the drilling and sampling operations. The stratification lines were approximated by the field engineer on the basis of observations made at the time of drilling. The actual boundaries between different soil types may be gradual and soil conditions may vary. For a more detailed description of the materials encountered, the Boring Logs in Appendix "A" should be consulted.

The Boring Logs include the soil type, color, moisture content, dry density, and the applicable Unified Soil Classification System symbol. The locations of the test borings were determined by measuring from feature shown on the Site Plan, provided to us. Hence, accuracy can be implied only to the degree that this method warrants.

8.2 Groundwater
The test boring locations were checked for the presence of groundwater during and after the drilling operations. Free groundwater was not encountered during this investigation. The historically highest groundwater is estimated to be at a depth of approximately 15 feet below existing grade based on the Seismic Hazard Zone Report 037, Whittier 7.5-Minute Quadrangle, Plate 1.2, Open-File Report 98-28.

It should be recognized that water table elevations may fluctuate with time, being dependent upon seasonal precipitation, irrigation, land use, localized pumping, and climatic conditions as well as other factors.

Therefore, water level observations at the time of the field investigation may vary from those encountered during the construction phase of the project. The evaluation of such factors is beyond the scope of this report.

8.3 Soil Corrosion Screening
Excessive sulfate in either the soil or native water may result in an adverse reaction between the cement in concrete and the soil. The 2014 Edition of ACI 318 (ACI 318) has established criteria for evaluation of sulfate and chloride levels and how they relate to cement reactivity with soil and/or water.

A soil sample was obtained from the project site and was tested for the evaluation of the potential for concrete deterioration or steel corrosion due to attack by soil-borne soluble salts and soluble chloride. The water-soluble sulfate concentration in the saturation extract from the soil sample was detected to be less Project No. 3-220-0499 - 7 -
than 50 mg/kg. ACI 318 Tables 19.3.1.1 and 19.3.2.1 outline exposure categories, classes, and concrete requirements by exposure class. ACI 318 requirements for site concrete based upon soluble sulfate are summarized in Table 8.3 below.

TABLE 8.3

WATER SOLUBLE SULFATE EXPOSURE REQUIREMENTS
The water-soluble chloride concentration detected in saturation extract from the soil samples was 24 mg/kg.

This level of chloride concentration is considered to be mildly corrosive.

It is recommended that a qualified corrosion engineer be consulted regarding protection of buried steel or ductile iron piping and conduit or, at a minimum, applicable manufacturer’s recommendations for corrosion protection of buried metal pipe be closely followed.

8.4 Percolation Testing
Three (3) percolation tests (P-1 through P-3) were performed at the proposed infiltration system areas and were conducted in accordance with the criteria set in the Low Impact Development BMP Guideline of the County of Los Angeles, Department of Public Works. Results of the falling head tests are presented in the attachments to this report. The approximate locations of the percolation tests are shown on the attached Site Plan, Figure 2.

The holes were pre-saturated before percolation testing commenced. Percolation rates were measured by filling the test holes with clean water and measuring the water drops at a certain time interval. The percolation rate data are presented in tabular format at the end of this Report. The difference in the percolation rates are reflected by the varied type of soil materials at the bottom of the test holes. The test results are shown on the table below.

TABLE 8.4

PERCOLATION TEST RESULTS
Test
No.

Depth
(feet)
Measured
Percolation Rate
(inch/hour)
Total
Reduction
Factor*
Design Infiltration
Rate (inch/hour)** Soil Type***
P-1 14.5 12.00 4 3.00 SAND (SP)
P-2 14.4 11.20 4 2.80 SAND w/Silt (SW/SM)
P-3 14.4 11.81 4 2.95 SAND (SP)
* RFt = 2, RFv = 1, RFs = 2, Total Reduction Factor, RF = RFt x RFv x RFs = 4 **Design Infiltration Rate = Measured Percolation Rate / RF *** At bottom of drilled holes
Water Soluble
Sulfate (SO4) in
Soil, % by Weight
Exposure
Severity
Exposure
Class
Maximum
w/cm Ratio
Min. Concrete
Compressive
Strength
Cementations
Materials
Type

0.0050 Not Severe S0 N/A 2,500 psi No Restriction
Project No. 3-220-0499 - 8 -
RFs = 1 to 3 which is based on the specified levels of pre-treatment and maintenance requirements. The value should be verified by the project Civil Engineer.

Please be advised that when performing percolation testing services in relatively small diameter borings, that the testing may not fully model the actual full scale long term performance of a given site. This is particularly true where percolation test data is to be used in the design of large infiltration system such as may be proposed for the site. The measured percolation rate includes dispersion of the water at the sidewalls of the boring as well as into the underlying soils. The soil infiltration or percolation rates are based on tests conducted with clear water. The infiltration/percolation rates may vary with time as a result of soil clogging from water impurities.

The soils may also become less permeable to impermeable if the soil is compacted. Thus, periodic maintenance consisting of clearing the bottom of the drainage system of clogged soils should be expected.

The infiltration/percolation rate may become slower if the surrounding soil is wet or saturated due to prolonged rainfalls. Additional percolation tests should be conducted at bottom of the drainage system during construction to verify the infiltration/percolation rate. Groundwater, if closer to the bottom of the drainage system, will also reduce the infiltration/percolation rate. Infiltration systems shall be located, at minimum, a distance of 10 feet from any foundations and 10 feet from property lines. Infiltration in compacted fill is not allowed. Provided that the infiltration system is located at a minimum distance of 10 feet away from any foundations, the infiltration would not result in distress to the adjacent buildings.

The scope of our services did not include a groundwater study and was limited to the performance of percolation testing and soil profile description, and the submitted data only. Our services did not include those associated with septic system design. Neither did services include an Environmental Site Assessment for the presence or absence of hazardous and/or toxic materials in the soil, groundwater, or atmosphere; or the presence of wetlands. Any statements, or absence of statements, in this report or on any boring logs regarding odors, unusual or suspicious items, or conditions observed, are strictly for descriptive purposes and are not intended to convey engineering judgment regarding potential hazardous and/or toxic assessment.

9. CONCLUSIONS AND RECOMMENDATIONS

9.1 General

9.1.1 Based upon the data collected during this investigation, and from a geotechnical engineering standpoint, it is our opinion that the site is suitable for the proposed construction of improvements at the site as planned, provided the recommendations contained in this report are incorporated into the project design and construction. Conclusions and recommendations provided in this report are based on our review of available literature, analysis of data obtained from our field exploration and laboratory testing program, and our understanding of the proposed development at this time.

9.1.2 The primary geotechnical constraints identified in our investigation is the presence of undocumented fill, liquefiable soils and compressible materials at the site. Recommendations to mitigate the effects of potentially compressible materials are provided in this report.

9.1.3 The scope of this investigation did not include subsurface exploration within the existing building during field exploration. As such, subsurface soil conditions and materials present Project No. 3-220-0499 - 9 -
below the existing site structures are unknown and may be different than those noted within this report. The presence of potentially unacceptable fill materials, undocumented fill, and/or loose soil material that may be present below existing site features shall be taken into consideration. Our firm shall be present at the time of demolition activities to verify soil conditions are consistent with those identified as part of this investigation.

9.1.4 Fill soils are anticipated to be present onsite between our test boring locations since the site was previously graded for the current development. Undocumented fill materials are not suitable to support any future structures and should be excavated and replaced with Engineered Fill. The extent and consistency of the fills should be verified during site construction. Prior to fill placement, SALEM should inspect the bottom of the excavation to verify the bottom condition.

9.1.5 Site demolition activities shall include removal of all surface obstructions not intended to be incorporated into final site design. In addition, underground buried structures and/or utility lines encountered during demolition and construction should be properly removed and the resulting excavations backfilled with Engineered Fill. It is suspected that possible demolition activities of the existing structures may disturb the upper soils. After demolition activities, it is recommended that disturbed soils be removed and/or recompacted.

9.1.6 Geogrid is a commonly and economically used method to reduce structural damage due to liquefaction. This method has been accepted by cities and counties throughout California, and implemented into design and construction of many retail buildings. However, this method may not be accepted by some local jurisdictions. We have no control for the acceptance of this method for this project. To use geogrid method, it is recommended that the proposed building be designed and the structural drawings be prepared after this report is approved by the City of Pico Rivera.

9.1.7 Recommendations for the geogrid system (option 1) are provided in Section 9.6 of this report.

As an alternative to the use of geogrid, the proposed building may be supported by a structural slab system. A structural slab system will help reduce structural damage caused by liquefaction.

Recommendations for a structural slab system (option 2) are provided in Section 9.7 of this report.

9.1.8 In lieu of the geogrid reinforcement method or the structural slab system, the buildings may be supported on deep foundations or by utilizing stone columns. Recommendations for a deep foundation system or the stone column method may be provided to the client by Salem Engineering Group, Inc. upon request.

9.1.9 SALEM shall review the project grading and foundation plans, and specifications prior to final design submittal to assess whether our recommendations have been properly implemented and evaluate if additional analysis and/or recommendations are required. If SALEM is not provided plans and specifications for review, we cannot assume any responsibility for the future performance of the project.

9.1.10 SALEM shall be present at the site during site demolition and preparation to observe site clearing/demolition, preparation of exposed surfaces after clearing, and placement, treatment and compaction of fill material.

Project No. 3-220-0499 - 10 -

9.1.11 SALEM's observations should be supplemented with periodic compaction tests to establish substantial conformance with these recommendations. Moisture content of footings and slab subgrade should be tested immediately prior to concrete placement. SALEM should observe foundation excavations prior to placement of reinforcing steel or concrete to assess whether the actual bearing conditions are compatible with the conditions anticipated during the preparation of this report.

← All documents from this meeting