delivery if such communication is sent by personal delivery; (b) 72 hours after deposit in the mail as reflected by the official U.S. postmark if such communication is sent through certified or registered mail; and (c) if sent by overnight delivery, upon the earlier to occur of actual receipt or the next business day after being sent by such delivery.
To CITY: City of Pico Rivera
6615 Passons Boulevard
Pico Rivera, CA 90660
Attn: City Manager
To CONTRACTOR: Nationwide Environmental Services
a division of Joe’s Sweeping, Inc.
11914 Front St.
Norwalk, CA 90650
Attn: Ani Samuelian
Each Party may change its address for receipt of notices by providing notice of the change to the other Party in accordance with this Section.
Notwithstanding the foregoing, correspondence limited to only the day-today administration of this Agreement (which does not include notices under Section III (Term), Section VIII (“Termination”) or for any alleged breach of the Agreement by the CONTRACTOR or CITY) may be sent by email to the designated representatives of the Parties. Email communications limited to only the day-to-day administration of this Agreement shall be deemed served or delivered one (1) business day after the email is sent, provided that no delivery failure notification has been received.
6. Section XVII Payment. Section XVII Payment of Agreement No. 92-505, as amended, for Street Sweeping Services and Hourly Rates for Special Cleaning is hereby amended in part as follows:
The Grand Fixed Monthly Total for Street Sweeping has been previously adjusted pursuant to the permitted Consumer Price Index increase as set forth in Supplemental Agreement No. 92-505-16, Amendment to Agreement No. 92-505, and the approval by the City Manager of the extraordinary rate adjustment as requested by CONTRACTOR and pursuant to the authority granted the City Manager by Supplemental Agreement No. 92-505-16, Amendment to Agreement No. 92-505, to approve such rate adjustment.
Accordingly, Agreement No. 92-505, as amended, is hereby amended in part to read as follows:
///
///
Amendment No. 19 to Agreement No. 92-505
NATIONWIDE ENVIRONMENTAL SERVICES
///
///
XVII. PAYMENT
STREET SWEEPING SERVICES
GRAND FIXED MONTHLY TOTAL THE SUM OF $65,504.26
In addition to the Grand Fixed Monthly Total for Street Sweeping, hourly rates for Special Cleaning (including Labor and Equipment) are agreed upon between the Parties as follows:
(a) Street Sweeper with Operator $134.98 per hour
(b) Pick-up Truck with Laborer $56.20 per hour
(c) Dump Truck with Driver $110.17 per hour
(d) Loader with Operator $114.72 per hour
The Grand Fixed Monthly Total for Bus Stop Services, (the Scope of the Bus Stop Services continues to be set forth in Supplemental Agreement No. 92-505-15, paragraph 1, and Exhibit A attached thereto and is in full force and effect), has been previously adjusted pursuant to the permitted Consumer Price Index increase as set forth in Supplemental Agreement No. 92-505-16, Amendment to Agreement No. 92-505, and accordingly, Agreement No. 92-505, as amended, is hereby amended in part to read as follows:
Section XVII of Agreement No. 92-505, for Bus Stop Services is hereby amended in part as follows:
BUS STOP SERVICES
XVII. PAYMENT.
GRAND FIXED MONTHLY TOTAL THE SUM OF $22,309.14
///
///
///
///
Amendment No. 19 to Agreement No. 92-505
NATIONWIDE ENVIRONMENTAL SERVICES
///
7. Section XVII Payment. Section XVII, Payment, of Agreement 92-505, as amended, for the Annual Consumer Price Index (“CPI”) increase is hereby amended to read as follows:
XVII PAYMENT
The Grand Fixed Monthly Total for Street Sweeping, for Bus Stop Services, and all hourly rates for Special Cleaning set forth in Section XVII, Payment, of Agreement 92-505, as amended, shall be automatically adjusted based on the increase in the Consumer Price Index (“CPI”), as provided for herein, beginning on September 1, 2026, and continuing on each September 1st thereafter during the term of the Agreement as amended, (“Annual CPI Adjustment”). The Annual CPI Adjustment as provided for herein shall be equal to the greater of the following: (i) the percentage change in the Consumer Price Index for All Urban Consumers for the Los AngelesAnaheim-Riverside Metropolitan Statistical Area (1982–84 = 100), as published by the U.S. Department of Labor, Bureau of Labor Statistics, comparing the June index for the current year to the June index for the prior year, or (ii) four percent (4%). In addition, pursuant to the authority granted the City Manager by Supplemental Agreement No. 92-505-16, Amendment to Agreement 92-505, Contractor shall have the right to seek an additional operational adjustment, for extraordinary or operational cost increases, including but not limited to increases related to labor, insurance, materials, fuel, equipment, or regulatory requirements at any time, subject to the approval of the City Manager.
8. The Agreement No. 92-505, as amended, is hereby amended by adding the following Force Majeure provision as follows:
Section XXII, Force Majeure.
A Party’s performance of any obligation under the Agreement shall be suspended if, and to the extent that, the Party is unable to perform because of any event of Force Majeure. In any such event, the Party unable to perform shall be required to resume performance of its obligations under the Agreement upon the termination of the event or cause that excused performance hereunder. As used herein, “Force Majeure” means an event which is beyond the reasonable control of a Party, including without Amendment No. 19 to Agreement No. 92-505
NATIONWIDE ENVIRONMENTAL SERVICES
limitation, (a) acts of God including flood, fire, earthquake, hurricane or explosion, pandemic, epidemics, or quarantine restrictions; (b) war, invasion, hostilities (whether war is declared or not), terrorist threats or acts, riot or other civil unrest; (c) government order or law that prevents either Party from performing its obligations as set forth in this Agreement; (d) action by any governmental authority that prevents either Party from performing its obligations as set forth in this Agreement; and (e) strikes, labor stoppages or slowdowns or other industrial disturbances, other than those involving the Parties’ employees.
Neither Party shall be liable for any delay or default in, or failure of, performance resulting from or arising out of any Force Majeure event, and no such delay, default in, or failure of performance shall constitute a breach by either Party hereunder. Where a Force Majeure event gives rise to a failure or delay in either Party performing its obligations under the Agreement (other than obligations to make payment), those obligations will be suspended for the duration of the Force Majeure event. A Party who becomes aware of a Force Majeure event which gives rise to any failure or delay in performing its obligations under the Agreement will notify the other in writing within fourteen (14) days of the commencement of such failure or delay and inform the other of the period for which it is estimated that such failure or delay will continue. The affected Party shall take reasonable steps to mitigate the effects of the Force Majeure event.
9. The Agreement No. 92-505, as amended, is hereby amended by adding the following CNG Fuel Reimbursement provision, Section XXIII, CNG Fuel Reimbursement, as follows:
Section XXIII, CNG Fuel Reimbursement. The Agreement No. 92-505, as amended, is hereby amended by adding the following CNG Fuel Reimbursement provision as follows:
Section XXIII. CNG Fuel Reimbursement.
CONTRACTOR, in providing street sweeping services to
CITY, agrees to utilize compressed natural gas ("CNG") fueled street sweeping vehicles. It is agreed upon by the parties that a portion of the monthly cost paid by CITY to CONTRACTOR for services rendered includes the cost of fuel. It is further agreed between the parties that the base price of CNG fuel is $2.55 per gallon.
Amendment No. 19 to Agreement No. 92-505
NATIONWIDE ENVIRONMENTAL SERVICES
In the event that, during any given month, the base price of CNG fuel exceeds $2.55, the CONTRACTOR shall, in addition to the fixed monthly service contract, recover the difference between the base price of CNG fuel of $2.55 and the current price of CNG fuel, multiplied by the established number of CNG fuel gallons utilized per month. CONTRACTOR will recover the aforementioned current CNG fuel increases, if any, on a monthly basis after review by the City Manager, or his designee, and Ms. Ani Samuelian, President of CONTRACTOR, or her designee. CONTRACTORS’ billing, for the monthly CNG fuel increases, if any, will include calculation of a rate increase based on the preceding month. The parties agree that the established gallons of CNG fuel utilized per month, is approximately 2,281.
The CITY reserves the right to audit CONTRACTORS
monthly fuel costs at anytime, upon CONTRACTORS receipt of written notice from the CITY. In the event CONTRACTOR refuses or fails to provide said information, within thirty (30) days of CITY’S written request, no further payments for the difference in the base price of CNG fuel of $2.55 and the current price of CNG fuel multiplied by the established number of CNG fuel gallons utilized per month shall be granted to CONTRACTOR.
10. Affirmation of Agreement; Warranty. CITY and CONTRACTOR each ratify and reaffirm each and every one of the respective rights and obligations arising under the Agreement No. 92-505, as amended. Each Party represents and warrants to the other that there have been no written or oral modifications to the Agreement No. 92-505, as amended, other than as provided herein. Each Party represents and warrants to the other that the Agreement No. 92-505, as amended, is currently effective, valid, and binding obligation.
CONTRACTOR represents and warrants to CITY that, as of the date of this Supplemental Agreement No. 92-505-19, CITY is not in default of any material term of the Agreement No. 92-505, as amended, and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement No. 92- 505, as amended.
CITY represents and warrants to CONTRACTOR that, as of the date of this Supplemental Agreement No. 92-505-19, CONTRACTOR is not in default of any material term of the Agreement No. 92-505, as amended, and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement No. 92-505, as amended.
Amendment No. 19 to Agreement No. 92-505
NATIONWIDE ENVIRONMENTAL SERVICES
11. Continuing Effect of Agreement. Except as expressly amended by this Supplemental Agreement No. 92-505-19, all other terms, conditions and provisions of the Agreement No. 92-505, as amended, shall remain unchanged, and are hereby ratified, validated, confirmed and reaffirmed by each Party in all respects, and are in full force and effect. CITY and CONTRACTOR agree that except as expressly provided in this Supplemental Agreement No. 92-505-19, no other amendments have been made to the Agreement No. 92-505, as amended. CITY and
CONTRACTOR agree that except as expressly provided herein, the provisions of the Agreement No. 92-505, as amended, shall remain in full force and effect, and that in the event of an inconsistency or conflict between the provisions of this Supplemental Agreement No. 92-505-19 and the provisions of the Agreement No. 92-505, as amended, this Supplemental Agreement No. 92-505-19 shall control but only to the extent of such conflict or inconsistency and no further. The Agreement No. 92-505, as amended, together with this Supplemental Agreement No. 92-505-19, contains the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed herein and the contract between the CITY and the CONTRACTOR and supersedes all prior negotiations, understandings or agreements, whether oral or written.
Notwithstanding the preceding language and to avoid any misunderstanding of the intent of the Parties, the deletions set forth in Paragraph 1.2 above of paragraphs 2 and 3 of Supplemental Agreement No. 92-505-14, including the paragraph 3 titled “Term,” pertains solely to the temporary disposal services arrangement set forth in Supplemental Agreement No. 92-505-14 and does not modify, alter, or otherwise affect Section III (Term of Contract) of Agreement No. 92-505, as amended by Supplemental Agreement No. 92-505-13 and Supplemental Agreement No. 92-505-15, or Section VIII (Termination) of Agreement No. 92-505, as amended by Supplemental Agreement No. 92-505-15. The definition of the “Term” for Agreement No. 92-505, as amended, shall be as set forth in Supplemental Agreements No. 92-505-13 and 92-505-15.
12. Authority. The persons executing this Supplemental Agreement No. 92- 505-19, Amendment to Agreement No. 92-505, on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Supplemental Agreement No. 92-505-19 on behalf of said party, (iii) by so executing this Supplemental Agreement No. 92-505-19, such party is formally bound to the provisions of this Supplemental Agreement No. 92-505-19, and (iv) the entering into this Supplemental Agreement No. 92-505-19 does not violate any provision of any other agreement to which said party is bound.
Amendment No. 19 to Agreement No. 92-505
NATIONWIDE ENVIRONMENTAL SERVICES
13. Counterparts; Electronic Signatures. This Supplemental Agreement No. 92-505-19 may be executed in one or more counterparts, each of which shall be deemed an original, and may be executed by electronic signatures.
All counterparts shall be construed together and shall constitute one agreement. Delivery of an executed counterpart of this Supplemental Agreement No. 92-505-19 by a .pdf data file or other scanned executed counterpart by email shall be equally as effective as delivery of a manually executed counterpart of this Supplemental Agreement No. 92-505-19. Each duplicate and counterpart shall be equally admissible in evidence, and each shall fully bind each Party who has executed it. The Parties waive all right to challenge the admissibility or authenticity of this Supplemental Agreement No. 92-505-19 in a court of law based solely on the absence of an original signature.
IN WITNESS WHEREOF, the parties have executed this Supplemental Agreement No. 92-505-19 on the date(s) set forth below, with the express intent that it will take effect as of April 1, 2026.
“CITY” “CONTRACTOR”
CITY OF PICO RIVERA, NATIONWIDE ENVIRONMENTAL, a
a Municipal Corporation division of JOE’S SWEEPING, INC.
By: By:
Steve Carmona, City Manager Ani Samuelian, President
Dated:___________________________ Dated: __________________________ ATTEST: APPROVED AS TO FORM:
Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney To: Mayor and City Council
From: City Manager
Meeting Date: March 24, 2026
Subject: AMENDMENT NO. 3 TO PROFESSIONAL SERVICES
AGREEMENT NO. 19-1887 WITH KIMLEY-HORN AND
ASSOCIATES, INC. FOR THE WASHINGTON TRANSITORIENTED DEVELOPMENT SPECIFIC PLAN Recommendation:
1. Approve Amendment No. 3 to Professional Services Agreement No. 19-1887 with Kimley-Horn and Associates, Inc. extending the contract to June 30, 2027;
2. Authorize the City Manager to execute the amendment in a form approved by the City Attorney; and
3. Approve a budget adjustment to the fiscal year (FY) 2025-26 Budget by reducing $85,500 from the Community and Economic Development (CED) General Fund (GF) Budget, transferring that amount from the GF to the Capital Improvement Project (CIP) Fund and appropriating the funds to this project.
Strategic Priority:
2 – Economic Development & Land Use - Encourage the development of underutilized space, plan for growth, and engage businesses to transform the City as an economic and cultural hub.
Strategy:
2.1 Foster an environment that promotes diverse business growth, attraction, retention, and housing opportunities in the City.
Fiscal Impact:
The project is currently budgeted in the amount of $638,196 as follows: Measure R State Grant (Account No. 207.70.7300-54500-CIP.50015 - $390,000), Economic 9 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT NO. 19-1887
WITH KIMLEY-HORN FOR THE WASHINGTON BOULEVARD TRANSIT-ORIENTED
DEVELOPMENT SPECIFIC PLAN
PAGE 2 OF 3
Sustainability Fund (Account No. 255.70.7300-54500-CIP.50015 – $248,196), and “inkind” Planning/Economic Development staff time in the CIP Fund (Account No. 400.70.7300-54500–CIP.50015 - $20,000). An additional appropriation of $85,500 will be needed to complete the project.
Should the City Council approve the budget adjustment, $85,500 will be reduced from the CED GF budget (Account No. 100.30.3020.54400), transferred from the GF (Account No. 100.98.9800-56900) to the CIP Fund (Account No. 400.00.0000-47900), and appropriated to the project (Account No. 400.70.7300-54500-CIP.50015). This adjustment would increase the project total to $743,696.
Background:
On March 27, 2018, the Los Angeles County Metropolitan Transportation Authority awarded the City of Pico Rivera (City) a $390,000 grant to prepare a Transit-Oriented Development (TOD) Specific Plan within a half-mile radius of the proposed Eastside Transit Corridor Phase 2 project. The project would potentially extend the L-Line (formerly Gold Line) from East Los Angeles through the cities of Commerce, Montebello, Pico Rivera, Santa Fe Springs, Whittier, and the unincorporated communities of East Los Angeles and West Whittier-Los Nietos. The TOD Specific Plan will identify land use policy, create development standards, and define economic revitalization goals for a transit-oriented neighborhood centered at the Washington Boulevard and Rosemead Boulevard intersection which is within the half-mile radius of the proposed rail extension.
Discussion:
On June 11, 2019, the City awarded Kimley-Horn and Associates, Inc. (Kimley-Horn) a contract for the creation of a Washington Boulevard TOD Specific Plan. Kimley-Horn is a full-service planning, engineering, and environmental consulting firm providing services since 1967 to private and public clients nationwide. Kimley-Horn has been involved in numerous transit-oriented development and specific plan projects throughout the nation and within Los Angeles County, including Metro grant-funded projects.
These include the City of Duarte’s Gold Line Station Area Development Specific Plan and the City of Downey’s Rancho Los Amigos South Campus TOD Specific Plan.
A draft product was provided by the consultant team; however, it will require substantial revisions to better align with the City’s goals of promoting development and fostering a thriving community. The contract agreement expired on June 30, 2025, and staff is requesting that the agreement be extended to June 30, 2027. The extension will give the Consultant and staff sufficient time to produce a comprehensive final product.
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT NO. 19-1887
WITH KIMLEY-HORN FOR THE WASHINGTON BOULEVARD TRANSIT-ORIENTED
DEVELOPMENT SPECIFIC PLAN
PAGE 3 OF 3
In the course of creating this plan, it was necessary to amend components of the plan, such as the traffic, land use, and parking study produced by the consultant team. As such an increase of $85,500 is needed to complete the project.
The revised total project budget is summarized as follows:
Funding Category Amount
Metro TOD Grant (Measure R) $390,000
Local Match – Economic Sustainability Fund $248,196
Local Match – Additional Being Requested $85,500
In-Kind Staff Time (Planning/Economic Development) $20,000 TOTAL PROJECT BUDGET $743,696
Conclusion:
Staff recommends approving Amendment No. 3 to extend the contract with Kimley-Horn Associates, Inc. through June 30, 2027, and to appropriate $85,500 from the Economic Sustainability Fund balance to the project.
Steve Carmona
SC:AB:JG:jj
Enclosure(s): 1) Amendment No. 3 to Agreement No. 19-1887 2) Amendment No. 2 to Agreement No. 19-1887
3) Amendment No. 1 to Agreement No. 19-1887
4) Agreement No. 19-1887
AMENDMENT NO. 3
TO AGREEMENT NO. 19-1887
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF PICO RIVERA AND KIMLEY-HORN
This Amendment No. 3 to Agreement No. 19-1887, Professional Services Agreement Between the City of Pico Rivera and Kimley-Horn and Associates, Incorporated (“Amendment No. 3”) effective as of the date specified in paragraph 5 hereof, is made and entered into by the City of Pico Rivera, a municipal corporation (“City”) and Kimley-Horn and Associates, Incorporated, a North Carolina Corporation (“Consultant”). City and Consultant are sometimes hereinafter referred to individually as “Party” and collectively as the “Parties.”
RECITALS
A. City and Consultant have previously executed Agreement No. 19-1887, Professional Services Agreement Between the City of Pico Rivera and KimleyHorn, dated on or about June 12, 2019, as amended by Amendment No. 1 and 2 to Agreement No. 19-1887, dated June 27, 2023 and October 14, 2024 respectively (“Agreement”), relating to the Washington Boulevard Transit Oriented Development (TOD) specific plan within the potential Eastside Transit Corridor extension in proximity to the intersection of Washington and Rosemead Boulevards.
B. Pursuant to Section 4 of the Agreement, the Parties desire to extend the Term of the Agreement until June 30, 2027.
C. The Parties also desire to amend said Agreement as set forth herein, pursuant to Section 6.3 of the Agreement for the purpose of incorporating additional costs associated with the updates to the fee escalation request submitted to the City on January 14, 2026, attached hereto as Exhibit 1-C to this Amendment No. 3.
D. The Parties also desire to amend the Agreement pursuant to Section 5.1 of the Agreement to add additional tasks to the Scope of Services attached hereto as Exhibit 1-C are hereby incorporated into the Agreement by reference.
NOW, THEREFORE, THE PARTIES AGREE THAT THE AGREEMENT SHALL BE AMENDED AS FOLLOWS:
1. TERM.
Pursuant to Section 4 of the Agreement, the Parties hereby extend the Term of the Agreement and amend the “Expiration Date” under Section 3.4 of the Agreement to June 30, 2027.
2. SCOPE OF SERVICES.
Enclosure 1
9a
Back to Agenda Outline
Amendment No. 3 to Agreement No. 19-1887
KIMLEY-HORN AND ASSOCIATES, INCORPORATED
In accordance with Section 5, Consultant’s Services, the Scope of Services in the Agreement shall hereby be supplemented with as-needed land use planning and traffic amendments (updates/recalculation of buildout scenarios and revised mapping/regulatory additions) attached as Exhibit 1-C.
3. COMPENSATION.
Section 5.1 is hereby amended for the purpose of incorporating amendment to draft document and project administration. City shall compensate Consultant for the updates to the fees and tasks identified in this Amendment No. 3 in an additional amount not-to-exceed eighty-five thousand five hundred dollars ($85,500.00) for a total project amount of seven hundred twenty-three thousand dollars and six hundred and ninety-six dollars ($723,696) pursuant to the Approved Fee Schedule attached hereto as Exhibit 1-C.
4. EFFECT OF AMENDMENTS.
Except as modified herein, either expressly or by necessary implication, the terms and provisions of the Agreement between the City and Consultant shall remain in full force and effect this Amendment No. 3 may be executed in counterparts all of which shall constitute but one original, and the same agreement.
5. EFFECTIVE DATE.
Unless otherwise specified herein, this Amendment No. 3 shall become effective as of July 1, 2025.
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 3 to be executed and attested by their respective officers hereunto duly authorized. “City” “Consultant”
CITY OF PICO RIVERA Kimley-Horn and Associates, Inc.
By: ___________________________ By: ____________________________ Steve Carmona, City Manager Chad E. Phillips, Senior Associate Date: ___________ Dated: ____________
ATTEST: APPROVED AS TO FORM:
___________________________ _________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney
kimley-horn.com 3801 University Avenue, Suite 300, Riverside, CA 92501 951 543 9868 Exhibit 1-C
January 14, 2026
Mr. Alvie Betancourt
Director, Community&Economic Development
City of Pico Rivera
6615 Passons Boulevard
Pico Rivera, CA 90660
RE: Contract Amendment No. 3 (to Original Contract dated June 12, 2019) Washington/Rosemead TOD Specific Plan and EIR
Dear Alvie:
Kimley-Horn and Associates, Inc. (Kimley-Horn) appreciates the opportunity to submit this contract amendment to provide continued planning and environmental support servicesto the City of Pico Rivera (“the Client”) for Washington/Rosemead TOD Specific Plan and EIR (“the Project”). This contract amendment has been prepared to identify additional budget requirements to make the requested additional Specific Plan land use revisions, additional budget for Final EIR preparation, as well as associated additional project management and meeting costs. Additionally, as our last contract amendment extended the Agreement until June 30, 2025, we have identified the need to extend the Agreement further, as well as provide for a 5% rate adjustment for work done since January 1, 2026.
SCOPE OF WORK
Task 1 – SP Revisions (additional budget)
Our current contract (Contract Amendment No. 2, Task 1), assumed one final round of City comment prior to release of the Draft SP. This work has all been completed.
The City has requested that Kimley-Horn revise the land use plan, and incorporate newly established definitions and permit use tablesin the Specific Plan. This task requires Kimley-Horn to revise the land use tables, land use plan, and associated text and graphics throughout the Specific Plan.
This task assumes one submittal of the revised SP to the City, based upon the revised land use plan and definitions provided by City staff. Kimley-Horn will hold a kickoff call with City staff to confirm land use plan and related key assumptions. Following this SP submittal, it is assumed that there will be no further revisions to the Specific Plan land use assumptions, and any
kimley-horn.com 3801 University Avenue, Suite 300, Riverside, CA 92501 951 543 9868 remaining Specific Plan comments from City staff will be provided as consolidated reconciled comments in one batch, and will be relatively minor (mostly editorial).
Kimley-Horn will provide the revised SP to City staff for their circulation to the industrial property owner stakeholders. Kimley-Horn assumes that stakeholder review will not result in any substantive changes to the SP, and any revisions, if at all, would be minor in nature (editorial).
Thistask also assumes one final round of City review, followed by City review of a “check copy” of the revised Draft Specific Plan. This task assumes that, following submittal of the revised Draft SP, no further revisions to the SP are required as part of the CEQA or public hearing process.
Up to 50 hours of staff time has been assumed for all remaining SP revisions.
Task 2 – Final EIR (additional budget)
We have completed all Draft EIR and Final EIR tasks noted in our current contract (including our original agreement, and Contract Amendment No. 2). Drafts have been prepared for responses to comments from January 2025 comment letters (received during the original Draft EIR comment period), in addition to drafts of the Findings and Mitigation Monitoring and Reporting Program. Additional budget is required to respond to the substantial EIR comments received in July and August 2025 following the May 2025 recirculation and extension of the public review period (particularly for comments from Rutan and Tucker, and from MBI on behalf of NAIOP).
Under this amendment, Kimley-Horn will prepare a Final EIR Errata to clarify the land use and development density changes proposed by the City for the Washington/Rosemead TOD Specific Plan. The Errata will explain how the updated land use and density assumptions relate to, and remain within, the overall envelope of impacts evaluated in the Draft EIR, and will provide any necessary clarifying narrative and tabular updates within the Errata document itself. No pageby-page edits to the Draft EIR are assumed, and redistribution or recirculation of the Draft EIR is not assumed to be necessary based on the nature and scale of the changes.
Kimley-Horn will update the previously drafted responses, Findings and MMRP to reflect the revised SP as well as incorporate appropriate language and any changes associated with the revised responses.
As part of this task, Kimley-Horn will also prepare qualitative responses to public and stakeholder comments received on the Draft EIR. Responses will focus on explaining and crossreferencing existing analysis and conclusions in the Draft EIR and the Errata. The goal is to document, in a clear and concise manner, how the land use and density refinements are addressed within the existing CEQA framework without changing the overall impact
kimley-horn.com 3801 University Avenue, Suite 300, Riverside, CA 92501 951 543 9868 conclusions. If the City or its legal counsel later determine that more substantial revisions or recirculation are required, those efforts would be treated as additional services under a separate amendment.
This task assumes that City staff will handle Final EIR and SP distribution and noticing, including the Notice of Determination.
Up to 100 hours of staff time has been assumed for all remaining Final EIR work products including the Final EIR, MMRP and Findings.
NOTE: if City staff are able to have the industrial stakeholders retract their July and August comment letters, this budget could be reduced.
Task 3 – Technical Study Responses
We have budgeted up to 80 hours for the technical team to address traffic and air quality/GHG comments. We have provided an optional task to conduct CALINE4 modeling of up to three scenarios, as requested by NAIOP.
Optional Task – If desired by City staff, Kimley-Horn could conduct CALINE4 modeling of up to three scenarios (Existing Conditions, Existing General Plan/Zoning, and Proposed Project), as requested by NAIOP. We recommend this optional task, given the comments by NAIOP.
Task 4 – Project Meetings and Management (future coordination/meetings) With the current requested land use assumption changes and associated additional EIR work, we are now estimating that our work program will go through May 2026 (assuming Notice to Proceed on this additional work by the end of January 2026). This represents an additional four (4) months of project management and meeting time. This task assumes that we have up to eight (8) future project update status calls with City staff between now and Project approval hearings, and that these meetings are virtual, and attended by up to three (3) Kimley-Horn staff.
Allowing for preparation, attendance and follow-up time, we assume up to 30 hours of project meeting time. The current contract has budget for public hearings, which we assume is adequate to cover public hearing preparation, attendance and follow-up time. Up to an additional 30 hours of Kimley-Horn staff time is assumed for project management through Project approval hearings and contract completion.
AGREEMENT END DATE EXTENSION
Kimley-Horn is recommending that our Agreement be extended until June 30, 2026. A detailed schedule will be provided to City staff upon Notice to Proceed forthis additional work.
kimley-horn.com 3801 University Avenue, Suite 300, Riverside, CA 92501 951 543 9868
RATE ESCALATION
Our last rate escalation was September 1, 2024, with the Agreement running through June 30, 2025. This contract amendment No. 3 incorporates a 5% rate increase for all work done effective January 1, 2026.
Additional Services
Any services not specifically provided for in the above Scope, if requested by the Client, will be billed as additional services, and performed at our then-current hourly rates.
SCHEDULE
Kimley-Horn will provide services as expeditiously as practicable with the goal of meeting a mutually agreed upon schedule. A detailed project schedule can be provided as soon as we have Notice to Proceed on this additional work. We estimate approximately six (6) weeks to produce the revised Specific Plan and Administrative Draft Final EIR, following Notice to Proceed.
FEE ESTIMATE
Kimley-Horn will perform the Scope of Services outlined above and as noted below in the Fee and Expenses Table. All Tasks will be invoiced on an hourly labor fee plus expense basis with the estimated labor fee shown, in accordance with our then current hourly rate schedule. Individual task amounts are provided for budgeting purposes only. Kimley-Horn reserves the right to reallocate amounts among tasks as necessary.
Direct reimbursable expenses such as express delivery services, fees, air travel, and other direct expenses will be billed at 1.15 times cost. Subconsultant charges will be invoiced at cost plus 15%. A percentage of labor fee will be added to each invoice to cover certain other expenses such as telecommunications, in-house reproduction, postage, supplies, project-related computer time, and local mileage. Administrative time related to the Project will be billed hourly. All permitting, application, and similar project fees are assumed to be paid directly by the Client. Should the Client request Kimley-Horn to advance any such Project fees on the Client’s behalf, a separate invoice for such fees, with a fifteen percent (15%) markup, will be immediately issued for payment by the Client. All payments due to Kimley-Horn are due within 30 days of receipt of the invoice and should include the invoice number and Kimley-Horn project number.
kimley-horn.com 3801 University Avenue, Suite 300, Riverside, CA 92501 951 543 9868 Agreement Amendment No. 3 Fee Estimate
Task 1 – SP Revisions $12,500
Task 2 – Final EIR $25,000
Task 3 – Technical Study Responses $20,000
Task 4 – Project Management/Meetings $18,000
TOTAL – Contract Amendment No. 3 (without optional task) $75,500 Previous Authorization (per Amendment No. 2): $638,196
Total Revised Contract Amount: $713,696
Optional Task (CALINE4 modeling): $10,000
Contract Amendment No. 3 (w/optional task): $85,500
kimley-horn.com 3801 University Avenue, Suite 300, Riverside, CA 92501 951 543 9868
CLOSURE
If you concur in all the foregoing and wish to direct usto proceed with the services, please have authorized persons execute the Amendment and return to us. Fees and times stated in this Amendment are valid for sixty (60) days after the date of this letter. We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. We look forward to the opportunity to work with you on this Project. Should you have any questions or require additional information, please contact Project Manager Kevin Thomas at (951) 543-9875 or via email at kevin.thomas@kimley- horn.com.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Kevin Thomas, CEP
Project Manager
Approved:
City of Pico Rivera
By:
(Signature)
(Print Name)
Title
Date
9b
9c
Enclosure 3
Enclosure 4
9d
PROPOSAL FOR
Consultant Services for preparation of a
Transit Oriented Development
(TOD) Specific Plan for the
GOLD LINE EASTSIDE
EXTENSION AT WASHINGTON
AND ROSEMEAD BOULEVARDS
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 1
COVER LETTER
March 4, 2019
Mr. Steve Carmona, Director of Community and
Economic Development
City of Pico Rivera, Community & Economic Development Department 6615 Passons Boulevard
Pico Rivera, CA 90660
Re: Proposal for Consultant Services for Preparation of a Transit Oriented Development (TOD) Specific Plan for the Gold Line Eastside Extension at Washington and Rosemead Boulevards Dear Mr. Carmona, Ms. Foulkes, and Members of the Selection Committee:
Our team’s collective, award winning experience, has shown that a successful implementation-oriented planning process will guide formative change for the City of Pico Rivera.
We stress the following “Success Factors”:
The Specific Plan as a Marketing Tool – An effective Specific Plan should be used to attract investment. To achieve this, it must resonate with potential investors, developers, business owners, and residents. The plan should explicitly describe the benefits to investment, development entitlement process, and other incentives that will attract quality development. The Specific Plan is akin to a Business Plan, providing the strategies and actions that bring the plan to fruition.
A Specific Plan that is Grounded in Reality – Big ideas are great, but a plan should be grounded in reality. We have seen other’s plans fail because they are not based on conditions ‘on the ground.’ The plan must consider the realities and limitations and develop a systematic approach, oftentimes learned by really listening to City and community members, to address and overcome these challenges.
Meaningful and Sustained Community Engagement – Meaningful and Sustained Community Engagement contributes to plans that fulfill the needs, wants, and desires of Pico Rivera residents and stakeholders.
The Planning Process in 360 degrees – Many times unsuccessful planning efforts create policy in silos. We believe that this TOD Specific Plan must be integrated, interconnected, and reinforce community values.
Our small team of experts is looking forward to serving the needs of the City, as set forth in the RFP. Our team, led by Project Manager and the City’s main contact, Dave Barquist, AICP, is made up of:
• Kimley-Horn – Specific Plan Preparation, Mobility/Circulation, Environmental Impact Report (EIR) Preparation, and
Community Engagement
• Keyser Marston – Economic Development/Fiscal Requirements • Crandall Arambula – TOD Urban Design
Our enclosed proposal demonstrates the history of quality, dedication, responsiveness, and experience that the City is looking for in a trusted consultant. We look forward to the next step in the selection process. Dave may be reached at Kimley-Horn, 765 The City Drive, Suite 200, Orange, CA 92868, or by phone at (714) 705-1317, or email at
[email protected].
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Dave Barquist, AICP Nikki Kerry, P.E.
Project Manager Principal/Senior Vice President
Certification of Receipt of Addendum: The signature above verifies we are in receipt of the addenda received February 19, 2019.
Nikki Kerry, P.E., Principal/Senior Vice President of Kimley-Horn, is authorized to bind agreement (contract) with the City of Pico Rivera.
Kimley-Horn is willing and able to execute a service agreement with the City of Pico Rivera. In addition, we agree to the terms of the agreement and if selected will submit the required insurance endorsements.
765 The City Drive
Suite 200
Orange, CA
92868
TEL 714.939.1030
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 2
SCOPE OF SERVICES
PROJECT UNDERSTANDING
The Kimley-Horn Team understands the City’s desire to develop a comprehensive Specific Plan that will address revitalization and reuse of the Washington/Rosemead area in anticipation of the future Gold Line extension in the City. The City plans to create a framework that strategically assesses and executes an implementable plan, providing a compact multi-modal, mixed-use, and sustainable environment that will become a focal point for community activity. The Specific Plan will establish a vibrant, interconnected community-oriented environment that reinforces and compliments reuse, revitalization and community health.
The Specific Plan will contribute to:
• Enhancement of economic development successes in the area • Creation of a mixed-use, compact, and multi-modal environment • Promotion of sustainable principles in design and development • Enhancement of the pedestrian scale and function of the built environment
• Establishment of a complementary mix of cultural uses, public spaces and outdoor activities
• Providing stronger connections with local neighborhoods and connectively with mobility options
• Promoting a family-oriented, culturally-enriched healthy lifestyle • Celebration and reinforcement of Pico Rivera’s character and history • Support future regional transportation and transit planning objectives
• Positioning the City to be highly competitive in securing future grant funding and alternative funding and financing options
The Specific Plan will establish an effective and implementable policy mechanism that introduces a complementary mix of land uses including compacted integrated development, a mix of residential, retail, open space, and commercial uses that capitalizes on the areas current and future opportunities.
Our team’s experience in developing strategic policies and policy programs for Specific Plans similar to this TOD Specific Plan tells us that successful outcomes will possess the following:
• A Land Use Vision the supports economic development, and quality urban spaces that are unique to the community’s needs
• Urban Design improvements in the Specific Plan area must be accompanied by a strong land use regulatory framework and economic development strategy.
• Sustained and meaningful community engagement to intimately understand the needs and preferences of the community will promote future change that is embraced by the community and encourages local investment.
• Design concepts, strategies, and actions that area realistic, tangible and implementable by a well-designed implementation plan.
SCOPE OF WORK
The following Scope of Work is modeled after the proposed Scope of Work presented in the RFP. As required by METRO grant reporting requirements, the Scope of Work should match that presented in the grant award to ensure the proper placement of funds. For ease of use in the required METRO reporting, the Scope of Work tasks as presented for the grant award are supplemented with additional task items, deliverables, and actions.
TASK 1 – PROJECT KICK-OFF AND EXISTING CONDITIONS
ANALYSIS
› TASK 1.1 – Project Area Planning – Scoping/Kick-off Meeting and Project Management
City of Pico Rivera (City) Staff and the Kimley Horn Team will prepare for and organize an initial scoping/kick-off meeting with LACMTA staff and any additional appropriate City agencies and/or departments. It is assumed the City will determine the appropriate attendees for the meeting.
Representatives from the Kimley Horn Team will prepare for and attend a Kick-off Meeting to 1) introduce and identify the roles of key members of the Kimley-Horn Team, City Staff, and other stakeholders as appropriate; 2) establish reporting protocols, and evaluate how Staff and consultants will collectively function as one Project Team; 3) discuss project objectives,
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 3
issues, and opportunities; 4) confirm project schedule and work program, and review outreach methods and timing; and 5) identify and transmit pertinent documents and studies, and other relevant data to the Kimley Horn Team.
Prior to the Kick-Off Meeting, Kimley-Horn will provide the City with a written request for documents, after exhausting all publicly available data on the website, regional agencies, and assessor information. This may include GIS data, maps, master plans, policies, and capital improvements Additionally, the project team will conduct Monthly Updates with the entire project team. These meetings are designed to ensure all team members are aware of project status, deadlines, work completed, and deliverables. It is assumed these updates will occur as a teleconference.
Task 1.1 Deliverables: • Pre-meeting lists of data needs • Meeting Agenda and Minutes • Project Contacts Matrix • List of Stakeholders • Map of study areas/maps • Summary matrix of relevant planning documents, current
planning efforts, and specific
opportunities for coordination
with other agencies and
departments, related meeting
agenda and minutes • Monthly Project Management
Meetings (teleconference)
› TASK 1.2 – Existing Conditions Inventory/Analysis
Baseline analysis of the project area environs will be a critical step in evaluating the potential for the project area. As mentioned in the City’s RFP, the project team will collaborate with METRO staff and their existing planning resources, such as the Transit Supportive Planning Toolkit. The station area analysis will include:
• Field Reconnaissance and Mapping – development of base mapping and identification of resources, opportunities/constraints, key features.
• Policy Audit – review of existing adopted local and regional policies, programs and regulations affecting the project area. This may include LACMTA policies, local zoning, general plan, CIP programs, and other relevant documents.
• Transit/Mobility Audit – The project area will be reviewed for transit and mobility considerations.
• Baseline Marketing Study – The project team, as described in future tasks, will conduct baseline economic/market analysis.
Task 1.2 Deliverables: • Draft and Final Comprehensive Existing Conditions Report and associated maps
› TASK 1.3 – Develop Community Engagement Infrastructure Community engagement will be of vital importance in the planning process in order to successfully develop a plan that is reflective of the community needs and provides an implementation strategy that respects the needs of those investing in the project area. To ensure the community is a strong partner in the planning process, a Community Engagement Plan will be developed. This plan will consist of the following elements:
• Matrix summary list of stakeholders, community groups, and interested parties
• Methods and strategies to inform and contact participants (web, and local access TV)
• Social Media strategies
• Outreach and promotional collateral (flyers, notices, meeting materials)
• Management of a Meetings and Workshops
• Identification of local events for community engagement (farmers market, and summer concerts.)
• Various language and translation needs (Spanish) during and throughout the planning process
• Project branding and outreach collateral
The Community Engagement Plan will be amended on a regular basis to reflect current conditions and will become a useful tool to facilitate effective, sustained community participation throughout the process.
Task 1.3 Deliverables: • Community Engagement Plan
› TASK 1.4 – Focus Group Discussions
Based upon the contact list developed as part of the community engagement infrastructure, the Kimley-Horn team will conduct up to four (4) focus group meetings. These focus groups will explore in more detail existing conditions, considerations, and opportunities in the project area.
Task 1.4 Deliverables:
• Focus group agenda • Meeting notes
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 4
› TASK 1.5 – Conduct Business and Property Owner Interviews Based upon the draft contact list developed by the Team during the Kick-Off Meeting, Kimley-Horn will prepare and conduct individual interview meetings with business and property owners. The intent of these ½ hour interviews is to elicit ideas, opportunities, and concerns from those who have a vested interest in the project area. It is assumed the meetings will occur over a 1-2 day period, with the City assisting with meeting scheduling and logistics.
Task 1.5 Deliverables:
• Individual interviews with
up to 16 pre-selected
interviewees
• Summary notes from
interviews
› TASK 1.6 – LACMTA Policy Collaboration Meeting
City Staff and Kimley-Horn will meet with LACMTA staff to discuss relevant LACMTA policies and programs, including the Transit Supportive Planning “Toolkit” and other applicable policies and tools. These may include the Countywide Sustainability Policy, First-Last Mile Strategic Plan, and the Green Places Toolkit. LACMTA will work in collaboration with City Staff and the Consultant team to review these documents and identify strategies and practices that should be incorporated into the Specific Plan.
Task 1.6 Deliverables: • Meeting minutes
› TASK 1.7 – Community Meeting #1 – Visioning Session/
Charrettes Workshop
Kimley-Horn will conduct an initial workshop to introduce the community to the Specific Plan process; discuss opportunities, challenges and ideas or the planning area; and provide an overview of the public hearing and adoption process. The primary goal of this workshop is to receive and summarize community ideas for the Specific Plan. A summary of existing conditions, issues, and opportunities will be presented to the Workshop participants to help stimulate dialogue. The ideas, opportunities, and challenges identified by participants will be utilized when formulating the land use and design alternative scenarios. Participants may include, but are not limited to local residents, local business/property owners/residents, local agencies (utilities, and school districts), developers/investors, and public officials (compliant with Brown Act provisions).
The Workshop is intended to be a highly engaging and participatory event.
The Kimley-Horn team will provide facilitation for the Workshop and will employ a variety of participatory techniques to directly engage participants and summarize individual and group ideas. After the Workshop a strong understanding of community needs and desires will be established.
The Kimley-Horn team will also conduct a project area walking tour if possible (or virtual walking tour conducted by our team), providing maps and materials for participants. We highly recommend participants get an “on the ground” perspective of the project area and are provided with a proper context when discussing project issues, challenges and opportunities.
The Kimley-Horn team will provide all Workshop materials, including presentations, exhibits, and other technical support.
Task 1.7 Deliverables: • Meeting agenda; presentation materials; meeting minutes › TASK 1.8 – Briefing with Elected Officials and Study Session Kimley-Horn will prepare for, and attend meetings with City elected officials, commissioners, and their staff members. These meetings and study sessions will be conducted on an as-needed basis to keep the policy makers informed of the project progress and to solicit feedback as necessary throughout the project phases.
Kimley-Horn will prepare materials for, and attend a Planning Commission and/or City Council study session, if possible during the process of preparing the draft plan, if there is scheduling availability on the part of the appointed and elected officials.
Task 1.8 Deliverables: • Meeting agendas, staff reports, and summaries TASK 2 – PLAN FRAMEWORK AND STATION AREA ANALYSIS
› TASK 2.1 – Analysis of Opportunity Sites
The project team will meet with City representatives to discuss recent development activity, projects currently in the entitlement process, and key vacant or underutilized properties in and around the Washington/ Rosemead TOD Specific Plan Project Area. The Kimley-Horn Team and City staff will tour the City’s targeted areas to better understand existing uses, observe potential Opportunity Sites, and detect any limitations/site conditions that may exist for attracting new businesses and development.
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 5
It is likely that development and/or financial incentives will be required to attract desirable, catalytic development. The catalytic development may be different for each Opportunity Site. Therefore, the recommendations and implementation plan will need to consider the resources available to the City as well as the unique characteristics of each Opportunity Site.
Ultimately, KMA will identify economic and financial incentives that can be deployed to enhance a project’s viability. While not exhaustive, the incentive tools that will be considered include:
• Enhanced Infrastructure Financing Districs
• Assessment district formation for operation and maintenance of public improvements.
• Community Revitalization and Investment Authorities
• Expedited development processing to accelerate desired projects. • Revised development fee programs to target particular businesses. • Federal Opportunity Zone Investments
• Contribution of site specific public revenues to attract desired development or reuse of existing improvements.
• Alternative land scenarios (e.g. mixed-use development) • Other potential/fundgng/fianancing tools
KMA will prepare a matrix that summarizes the implementation mechanisms and suitability for the Opportunity Sites. The matrix will consider the following issues related to the funding mechanisms:
Task 2.1 Deliverables:
• KMA will synthesize the matrix into a narrative, which summarizes how the funding mechanisms would work in concert. The narrative will also provide a timeline identifying how the program would be implemented.
› TASK 2.2 – Conduct Market and Development Feasibility Study KMA will be keenly aware of the potential synergy for commercial and residential development adjacent to transit. To this end, KMA will rely on our experience with transit oriented developments in the region, particularly locations along Metrolink; the Metro Gold Line, Purple Line and Red Line; and other major TODs such as ARTIC in Anaheim. The scope of services below considers KMA’s extensive experience in the market area and its unique characteristics. To this end, the KMA analysis will include:
Market Area Review
KMA will analyze the makeup of the residents, employment and businesses within the following areas:
1. The pertinent market area;
2. The City of Pico Rivera; and
3. Los Angeles County.
There are a number of important demographic and economic characteristics that will profoundly impact the market support for residential and retail development. Included among these are the number of households, household formation, population, income levels and the resulting retail expenditures potential. In addition, KMA will summarize business patterns in the market area. This information will be obtained from state and local governmental agencies; private firms specializing in demographic and business data; a market area reconnaissance; a review of the general land use plan; any studies the City has performed; a review of reports prepared for the City; and market research conducted by KMA.
Assessment of Market Conditions
The Market Area Review will set the stage for KMA’s subsequent research.
By first identifying the salient factors that will impact future development, KMA can proceed with an assessment of market conditions to identify near- to long-term development opportunities. The assessment of market conditions will consider the strengths, weaknesses and opportunities for present and future uses for the Opportunity Sites. The analysis will evaluate the following:
Real Estate Conditions
1. Local and regional rent levels
2. Residential sales prices
3. Vacancy rates
4. Land and building values
5. Recent transactions
6. Proposed developments
Source of funding
(e.g. Federal,
State, Local)
Potential
assistance costs
Method for
obtaining funding
Program benefits
and drawbacks
Ongoing
responsibility
for program
management
Timeline for
implementation
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 6
Market Area Performance
1. Sales productivity levels
2. Retail surplus/leakage
analysis by establishment
type
3. Residential growth projections
4. Office demand projections
Based on the information compiled, KMA will evaluate the strengths and weaknesses embodied by the existing uses in the immediate area, Pico Rivera and surrounding jurisdictions. Information sources will include:
1. Interviews with brokers and
developers active in the area;
2. Real estate market reports
prepared by real estate
service corporations;
3. Sales tax information provided
by the City and the State
Board of Equalization;
4. Publications prepared by local
governmental agencies;
5. Information obtained from
private firms; and
6. Market research conducted
by KMA.
Assessment of Opportunities
Based on the information collected in Market Area Review and Assessment of Market Conditions, KMA will identify opportunities for each of the Opportunity Sites.
Entitlements and Physical Constraints
KMA will review the existing entitlements and physical properties for the Opportunity Sites to identify limitations, concerns and issues.
Market Considerations
The information compiled in the previous tasks will be utilized to evaluate the market opportunities for each Opportunity Site. This evaluation will consider the depth of demand for various development types throughout the larger market area, and the appropriateness of these uses for each Opportunity Site. Specifically, KMA will conduct the following analyses:
• Review amount of development planned for the Opportunity Sites and immediate area
• Compare results of surplus leakage analysis to potential scale of development allowed in the Opportunity Sites and immediate area • Identify the types of retail with market support and consider their appropriateness for the Opportunity Sites, with particular attention given to the potential format of the retail space (e.g. small tenant mixed-use retail, small box retail, big box retail, etc.) allowed • Estimate the square footage of office development appropriate for each Opportunity Sites
• Identify residential product types best suited for each Opportunity Site
Task 2.2 Deliverables:
• KMA will prepare a memorandum and series of tables that summarize the overall market conditions and the opportunities for each Opportunity Site.
› TASK 2.3 – Conduct Parking Study and Parking Management Plan Our approach is intended to provide the specific plan areas with a comprehensive parking strategy that will include parking inventory, review of shared parking arrangements, defining parking demand today and in the future, and presenting recommendations to improve the parking system and enhance economic vitality in the area. The following subtasks define the project approach:
Parking Data Collection – Kimley-Horn will perform a field visit to understand parking inventory, shared parking arrangements, and general parking occupancy for the specific plan area. The field review will strive to define the area parking supply in such a way as to differentiate between transit parking and parking supply for other public utility, allowing the project team to define current parking characteristics and potential arrangements that will better utilize the parking supply.
Parking Demand Evaluation – Using the data collected in the first task and the preferred land use scenario, Kimley-Horn will develop a Microsoft Excel based shared parking model for the study area based upon established industry standards such as ITE and ULI guidelines, with specific sub areas developed to represent consolidated mixed-use areas or areas of defined shared parking. The model will be calibrated to the collected conditions to more accurately reflect the parking demand characteristics in the area. Using these calibrated conditions, Kimley-Horn will model the demand for additional parking due to existing and proposed parking in the study area.
Recommendations – Following the development of parking demand projections, Kimley-Horn will utilize the existing data and proposed parking projections to evaluate supply, balancing through shared parking and incremental parking management strategies. The recommendations will
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 7
be oriented towards promoting shared parking; a park once philosophy throughout the area; and a parking system that supports and promotes the economic vitality of the community. Following the completion of these tasks, Kimley-Horn will document the analysis, methodology, findings, and recommendations into a draft summary for submission to the City.
Task 2.3 Deliverables:
• Existing Conditions LOS, VMT,
and Parking Analysis Memo
along with tables and graphics
• Future Conditions with
mitigation strategies
with graphics
› TASK 2.4 – Mobility Assessment
Kimley-Horn will review up to three (3) land use scenarios and complete an analysis associated with the preferred land use scenario. This analysis could be utilized to determine the transportation impacts on the street system within the TOD Specific Plan area. We will complete a trip generation calculation and trip distribution assignment for the preferred land use scenario to forecast the potential effects of the preferred land use scenario on the street network.
We will analyze intersection operations based upon the City’s traffic analysis requirements. We have assumed up to 15 intersections and six (6) roadway segments in our analysis. The analysis will identify the level of service (LOS) at each intersection and for the roadway segments. Weekday peak hour intersection operations will be calculated for the following scenarios: Existing Conditions, Existing Conditions + Project, Future Conditions without Project, and Future Conditions + Project.
As part of this task, Kimley-Horn will augment the LOS analysis with a Vehicle Miles Traveled (VMT) analysis. Kimley-Horn will meet with the City’s VMT coordinator to identify the City’s VMT thresholds that would be based upon the recently issued SB 743 guidelines. Kimley-Horn will review the City’s VMT model trip generation assumptions for the study area and complete a VMT analysis based on the City’s VMT model output.
The analysis will provide a determination of significant impacts based on the City’s VMT thresholds. The VMT analysis will be incorporated into the Traffic Impact Assessment (TIA) currently being prepared.
Complete Streets aspects and non-vehicular mobility in the TOD specific plan area will be evaluated. Kimley-Horn will review the preferred land use scenario and identify locations where density changes or land use changes may affect the way streets are utilized. We will identify opportunities to incorporate complete streets elements to accommodate pedestrians, bicyclists, transit users, along with automobiles. As we incorporate these elements, we will determine the appropriate method to evaluate the LOS at these intersections and roadway segments. We will document the results in the transportation section of the Specific Plan document.
Task 2.4 Deliverables:
• Draft and Final Mobility Assessment
› TASK 2.5 – Community Workshop #2
A second public workshop/meeting will be conducted to discuss the preliminary findings of the background analysis, market and development feasibility, parking study, and traffic/circulation study; summarize the findings from the prior workshop and begin to development of the “two dimensional” land use concepts the may apply to the Specific Plan area.
The workshop will explore a variety of alternatives and seek additional thoughts and ideas from the public.
Task 2.5 Deliverables: • Meeting agenda; Powerpoint presentation; other materials, as necessary
• Meeting Notes
› TASK 2.6 – Briefing with Elected Officials and Study Session Kimley-Horn will prepare materials for, and attend a second Planning Commission and/or City Council study session, if possible, during the process of preparing the draft plan, if there is scheduling availability on the part of the appointed and elected officials.
Task 2.6 Deliverables:
• Meeting agenda, presentation materials, and summary
TASK 3 – DRAFT SPECIFIC PLAN AND GENERAL PLAN/
ZONING RECOMMENDATIONS
› TASK 3.1 – Development of Land Use Plan
Kimley-Horn will develop a Land Use Plan indicating the type of development that is envisioned from the Specific Plan area along with circulation improvements to tie the plan area together. Due to the likelihood of the development of each of the land use areas occurring over an extended period of time, it is necessary they be flexible enough to
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 8
respond to changing market demands.
Task 3.1 Deliverables:
• Draft and Final Land Use Plan
› TASK 3.2 – Prepare Development Standards, Design Guidelines, and Public Improvements
Kimley-Horn will prepare development standards and design guidelines that address the current and proposed design concepts and supportive development for various types of TOD mixed-uses within and directly adjacent to the study area. Based on feedback from previous tasks, the design guidelines are intended to ensure that new development is compatible to the surrounding neighborhood and compliments LACMTA’s Transit Supportive Planning Toolkit’s 10 Characteristics of Transit Supportive Places.
Kimley Horn will identify the improvements needed for the street network and intersections within the specific plan area. Kimley-Horn will review relevant wet and dry infrastructure elements such as gas, power, telephone, communications, water, stormwater, and sewer within the specific plan area, and will determine applicable codes related to engineering and infrastructure design, and inform the project team.
Based upon the preferred land use scenario, we will identify potential improvements that will be required for these infrastructure elements. The analysis will not include detailed engineering calculations but will be more cursory in nature.
Task 3.2 Deliverables:
• Draft and Final development standards and design guidelines › TASK 3.3 – Implementation Action Plan
As the TOD Specific Plan is a long-term policy investment, it is important to have an actionable implementation plan to provide long term project success. The Implementation Action Plan will provide the tangible actions to be under-taken by various parties involved in the Specific Plan’s implementation. Based on the information and results gathered in Tasks 1-3, The Kimley-Horn Team will prepare an implementation plan that identifies and prioritizes issues/goals that require action in the short and/ or long term. To address specific issues within the implementation plan, the following tasks will be conducted:
• Identify potential economic incentives, funding sources (including regional, state, and federal infrastructure funding sources), or financing structures and other strategies (e.g. Development Opportunity Reserve [D.O.R.™], enhanced infrastructure financing districts or other special district financing, site-specific tax revenue pledges, as may be applicable) to attract development that achieves the plan’s goals and objectives.
• Development of a roadmap framework to the implementation of a potential Enhanced Infrastructure Financing District (EIFD) for the Project Area, including:
» a summary of the fundamentals of EIFD and complementary tools » an explanation of the pros/cons of EIFD development » an overview of the analyses, formation milestones, and potential timelines necessary for EIFD creation » a summary of strategic considerations (such as land ownership and future development, infrastructure needs, potential public/ private sector partners) for EIFD implementation • Provide a housing market and employment opportunity summary that is geared toward TOD development implementation, which includes an overview of economically viable housing development options within the Project Area and potential targets for developing employment opportunities for Pico Rivera residents.
Task 3.3 Deliverables:
• Draft and Final Implementation Action Plan Document
› TASK 3.4 – Community Workshop #3
The Kimley-Horn Team will conduct a third workshop to present revised concepts, strategies, policies, programs, and other relevant data. The workshop is envisioned as a more “Open House” style meeting, so that participants can interact with those areas they are the most interested in.
Task 3.4 Deliverables:
• Meeting agenda, presentation materials, and summary
TASK 4 – PREPARE PLANNING DOCUMENTS
› TASK 4.1 – Prepare Draft TOD Specific Plan
Kimley-Horn will prepare a stand-alone Specific Plan document in compliance with California Government Code Section 6540-65457 and with the State Guidelines for the preparation of Specific Plans for
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 9
review by City staff, the committee members, stakeholders, City council, and planning commission. Kimley-Horn assumes the following general organizational framework for the draft Specific Plan document:
• Chapter 1: Executive
Summary/Introduction
• Chapter 2: Introduction to
Washington/Rosemead Blvd
• Chapter 3: Planning and
Design Framework
• Chapter 4: Land Use and
Development Regulations
• Chapter 5: Design Guidelines
• Chapter 6: Community Design
and Improvements Plan
• Chapter 7: Implementation
and Administration
Detailed land use and development regulations will be formulated for the specific land use districts developed for the Specific Plan. Regulations will be formulated in conjunction with staff input and based on previous findings by Kimley-Horn. It is assumed Kimley-Horn will employ a “hybrid” approach to the development standards, providing a complimentary mix of “form-based” development standards and traditional regulatory techniques. The development regulations section, which constitutes the legal zoning for the plan area, will include all necessary regulatory elements to implement the intent and purpose of each land use district.
Areas of emphasis include:
• Permitted, conditionally
permitted uses
• Form-based development
standards
• Nonconforming uses and
structures
• FAR/Dwelling Units
• Height and setbacks
• Parking and site access
• Mixed-use development
standards
• Residential development
• Sidewalk cafes/outdoor uses
• Transit-supportive
development
• Signage
• Sustainable design standards
Development incentives will provide a significant positive influence on the likelihood of desired development within the Specific Plan area.
Development incentives provide a means for the encouragement of the type and quality of development with the Specific Plan area. The Kimley-Horn Team will develop a menu of incentives to be included within the Specific Plan area that may include:
• Residential Density Bonuses
(du/ac)
• Development Intensity
Bonuses (FAR)
• Streamlined discretionary
review
• Height bonuses
• Fee deferral/waivers/
modifications
• Parking reductions/
modifications
The Kimley-Horn Team will evaluate the potential features, activities, or type of development that may promote the purpose and intent of the Specific Plan. Applicable features, activities, or types of development that may be eligible for development incentives may include:
• Sustainable design features
• Facade rehabilitation
• Shared parking/access
• Site amenities
• Mixed-use development
• Exemplary architecture
As specifically described in the RFP, City Staff shall conduct two (2) rounds of review on the Draft TOD Specific Plan, with Kimley-Horn revising the draft after the completion of each round of review. LACMTA will provide a comprehensive review of the draft and provide feedback to Kimley-Horn who will revise the draft prior to public release.
Task 4.1 Deliverables:
• One (1) electronic and five (5)
hard copies of the Draft TOD
Specific Plan per round of City
Staff and LACMTA review
• One (1) electronic copy of
redlined Draft TOD Specific
Plan for each round of review
› TASK 4.2 – Prepare Draft General Plan Land Use Policy Map and Zoning
Kimley-Horn will make necessary amendments to the General Plan Policy Map and Zoning Code Map to provide consistency. Use Policy Map and as appropriate, the Zoning Code. Two (2) rounds of review on the Draft General Plan Land Use Policy Map and Zoning Code Amendment will be conducted.
Task 4.2 Deliverables:
• One (1) electronic and five (5) hard copies of the Draft General Plan Land Use Policy Map and Zoning Code Amendment per each round of review
• One (1) electronic copy of redlined Draft General Plan Land Use Policy Map and Zoning Code Amendment for each round of review › TASK 4.3 – Release Draft TOD Specific Plan to the Public As described in later tasks, the TOD Specific Plan will be released for
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 10
review per local adopted standards, state law, and all other applicable laws. If comments are received on the Specific Plan or EIR, a summary matrix of comments and responses will be completed. Pursuant to State law and applicable local standards, the draft TOD Specific Plan will be distributed for Public Review.
Task 4.3 Deliverables:
• Notices and summary of comments received
› TASK 4.4 – Planning Commission Public Hearings
Public hearings before the Planning Commission will be conducted to adopt the Specific Plan and make a recommendation to the City Council.
It is assumed two (2) meetings before the Planning Commission and City Council will be conducted. Kimley-Horn shall prepare for, and attend each public hearing. Kimley-Horn will assist City Staff in creating a report and PowerPoint Presentation. Comments from Planning Commission will be incorporated into the Specific Plan and EIR.
Task 4.4 Deliverables: • Powerpoint Presentation; meeting attendance; staff report assistance
› TASK 4.5 – City Council Public Hearings
Public hearings before the City Council will be conducted to adopt the Specific Plan and certify the EIR. It is assumed two (2) meetings before the City Council will be conducted. Kimley-Horn shall prepare for, and attend each public hearing.
Task 4.5 Deliverables: • Powerpoint presentation; meeting attendance; staff report assistance
› TASK 4.6 – Finalize General Plan Land Use Policy Map and TOD Specific Plan
Upon final adoption by the City Council, the Specific Plan and all other relevant documents will be compiled and finalized.
Task 4.7 Deliverables:
• Final General Plan Land Use
Policy Map
• One (1) final camera-ready
print Final Specific Plan
• Electronic format documents
(documents/map)
• Native File Formats for all
documents
TASK 5 – ENVIRONMENTAL COMPLIANCE
› TASK 5.1 – Initial Study and Notice of Preparation
Kimley-Horn will prepare a Notice of Preparation (NOP) in compliance with CEQA. Kimley-Horn will circulate the “Expanded” NOP (see below) as part of the early scoping effort. Kimley-Horn will file the NOP at the County and State Clearinghouse, and distribute to all trustee and responsible agencies, consistent with State CEQA Guidelines.
Scope Modification Recommendations: a) Kimley-Horn recommends an “Expanded” NOP and Project Information Packet; b) if the project requires a General Plan Amendment, Kimley-Horn recommends initiating SB18 consultation as part of the NOP process.
Task 5.1 Deliverables:
Draft and Final Expanded NOP and Project Information Packet (electronic copies), five (5) hard copies of Final Expanded NOP and Project Information Packet.
Scope Modification Recommendation Task 5.1.2: CEQA Project Description Prior to Expanded NOP preparation and building on the data obtained at the Project Kick-Off Meeting, Kimley-Horn will prepare a draft CEQA Project Description pursuant to CEQA requirements for City review and approval. Kimley-Horn will prepare exhibits to depict the regional and site vicinity and key Project components to support the environmental analyses. Kimley-Horn will respond to one reconciled set of City comments on the draft Project Description. Kimley-Horn will prepare a “check copy” Project Description and submit to the City for approval prior to finalizing.
Scope Modification Deliverables: Draft and Final Project Descriptions › TASK 5.2 – Public Scoping Meeting
Kimley-Horn will conduct one (1) public scoping meeting during the 30- day review period to orient the community on CEQA’s intent and review processes, and the environmental issues to be addressed in the EIR.
Task 5.2 Deliverables:
• Meeting agenda, presentation, notices, and summary notes
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 11
› TASK 5.3 – Prepare Screencheck Draft Environmental Impact Report (DEIR)
Kimley-Horn will prepare a DEIR in compliance with CEQA for City’s administrative review. The EIR will focus on the following issues: air quality, energy, greenhouse gas emissions, land use and planning, noise, transportation, utilities and service systems, and possibly aesthetics, cultural resources, hazards and hazardous materials, hydrology and water quality, population and housing, public services, and recreation.
In addition to the NOP, Kimley-Horn will prepare and distribute the following CEQA Notices: Notice of Completion (NOC), Notice of Availability (NOA), and Notice of Determination (NOD). These will be distributed via certified mail to the State Clearinghouse and all responsible, trustee, and interested agencies, community groups, and individuals, and filed with the County Clerk. Distribution will be based upon a City-provided distribution list. This Scope excludes any required radius mailing and newspaper notices.
Technical Studies: In addition to incorporating the Specific Plan and related infrastructure master planning studies, the EIR will include the following technical studies:
• Kimley-Horn will utilize to the extent practical available reference documents and prior CEQA documents including the existing adopted policy and regulatory documents.
• Kimley-Horn assumes that a Water Supply Assessment, if required, would be provided by the local water purveyor.
• Kimley-Horn will rely primarily upon readily available plans and reports from other agencies concerning geology/soils, hydrology, utilities, and public services.
• Traffic Impact Analysis (TIA)– Kimley-Horn will conduct a TIA for the Specific Plan area. This will include baseline data collected during prior tasks, an analysis of project-related impacts, and recommended mitigation based upon a “buildout” analysis of the project area. The TIA will provide the necessary data to conduct air quality and noise analyses for the project.
• Air Quality/Greenhouse Gasses – Kimley-Horn will prepare formal technical reports consistent with applicable guidelines, based on the Project’s TIA and Specific Plan land uses. The reports will address construction and operational emissions and include recommended mitigation measures. The reports will address federal Clean Air Act conformity to allow for state or federal funding.
• Noise – Kimley-Horn will prepare a Noise Assessment consistent with City standards and applicable guidelines. The assessment will:
include ambient noise measurements at up to five (5) locations, address construction and operational noise and vibration, with an emphasis on proximity to sensitive receptors, address traffic-related noise, and evaluate noise and vibration changes related to project transit uses and rail activity.
• Biological Resources – Kimley-Horn will prepare a technical memorandum documenting the absence of sensitive biological resources, including standard recommendations for Migratory Bird Treaty Act compliance during construction.
• Phase I Environmental Site Assessment – Kimley-Horn will conduct a site reconnaissance and literature/records review for purposes of the CEQA document, including review of available reports from the City, County, and applicable local, state, and federal agencies regarding the site. A formal ASTM protocol Phase I ESA is not proposed, although this could be provided under separate scope and fee if desired.
Task 5.3 Deliverables:
• Screencheck Draft EIR
• One (1) electronic and one (1) hard copy of the Screencheck Draft EIR › TASK 5.4 – Public Draft EIR (DEIR) and Public Review
Upon completion of the City’s review of the administrative DEIR, Kimley-Horn will incorporate City comments and prepare a public review DEIR. Kimley-Horn assumes of the City will provide one reconciled set of comments on the Screencheck DEIR. Kimley-Horn will submit a “check copy” of the DEIR for City final approval prior to public release. Upon completion of the public draft, Kimley-Horn will prepare and distribute the Notice of Availability for the DEIR; see task below. The Draft EIR will be released for a 90-day public comment period. Kimley-Horn assumes that limited quantities of EIR hard copies will be provided (approximately 20), and appendices will be provided on CD. Kimley-Horn will provide a webready version of the EIR for posting on the City’s website.
Task 5.4 Deliverables:
• Draft EIR
• One (1) electronic and 20 hard copies of Draft EIR
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 12
› TASK 5.5 – Prepare Responses to Comments
Following the completion of the DEIR public review comment period, Kimley-Horn will prepare responses to comments on environmental issues in writing. Up to 40 hours are assumed for this task.
Task 5.5 Deliverables:
• Draft responses to comments
› TASK 5.6 – Prepare Draft and Final Mitigation Monitoring Program (MMP) and Findings
Kimley-Horn will prepare the MMP and draft CEQA Findings for City review and approval, including a Statement of Overriding Considerations if required.
Task 5.6 Deliverables:
• One (1) electronic and one
(1) hard copy of the Draft and
Final MMP
• One (1) electronic and one
(1) hard copy of the Draft and
Final Findings
› TASK 5.7 – Prepare Final EIR (FEIR)
The Final EIR (FEIR) will consist of the Comment Letters, Responses to Comments, and Errata to the Draft EIR, as needed. Upon completion of the City’s review of the administrative responses, Kimley-Horn will incorporate the City’s changes and prepare the FEIR. Kimley-Horn assumes one (1) reconciled set of City comments on the administrative FEIR will be provided.
Kimley-Horn will provide a web-ready version of the Final EIR for City posting on its website. Following City Council certification of the FEIR, Kimley-Horn will prepare and file a NOD with the County Clerk and State Clearinghouse.
Prepare 5.7 Deliverables:
• Final EIR for public hearings.
• One (1) electronic and five (5) hard copies of the Final EIR. › TASK 5.8 – Planning Commission Public Hearings
Similar to Task 4.4, Kimley-Horn’s CEQA experts will attend Planning Commission Public Hearings, as necessary.
Task 5.8 Deliverables: • Public hearing package, staff report, PowerPoint Presentation, signed resolutions, and meeting minutes and approvals.
› TASK 5.9 – City Council Public Hearings
Similar to Task 4.4, Kimley-Horn’s CEQA experts will attend City Council Public Hearings, as necessary.
Task 5.9 Deliverables: • Powerpoint presentation; meeting attendance; staff report assistance
STATEMENT OF QUALIFICATIONS
Firm Overview and Qualifications
Kimley-Horn combines national experience with local insight as part of developing successful solutions for public projects. Renowned for our work on community and land use planning, transportation and mobility, infrastructure, urban design, and streetscape projects nationwide, our multidisciplinary team employs a process-driven approach to planning and design while emphasizing community amenities, sustainable design principles, and a strong sense of place.
Our team brings together multiple professional disciplines working within a collaborative environment to address local community needs in the context of larger regional goals. Our in-house team includes community planners, urban designers, landscape architects, civil engineers, transportation engineers, environmental professionals, graphic designers, and community outreach specialists.
Full Service Planning and Engineering Firm
Kimley-Horn is a full-service planning, engineering, and environmental consulting firm providing services to private and public clients nationwide. We have 12 offices throughout California, including offices in Los Angeles and Orange, with more than 400 staff.
Further support includes more than 3,500 employees and engineers in 87 offices nationwide. Kimley-Horn is consistently ranked by Engineering News-Record as one of the top firms in the nation, and one of the “100 Best Companies to Work for in the U.S.” by Fortune magazine.
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 13
Planning Services
Our team of planning professionals understands the interrelated nature of development policy and employs a “360 degree” view of planning.
We incorporate this holistic approach in our projects, and create plans, programs, and processes that are effective tools for guiding future growth and change. Our areas of expertise in support of the Pico Rivera TOD Specific Plan include:
Specific Plans and General Plans –Kimley-Horn has extensive experience in the development of Specific Plans (TOD and otherwise), primarily focused on existing urbanized environments. Our plans provide for customized development, design guidance, development standards, and entitlement procedures. Additionally, our expertise includes the development of public improvements such as streetscape/urban design, infrastructure,
parking facilities,
and community
amenities. Our team
has also developed
General Plan policies
for numerous
jurisdictions
throughout California
and is well-versed in
the new legislative
requirements,
including AB 1358,
the Complete Streets
Act, AB 32, and SB 375.
Transportation and Mobility – Kimley-Horn understands that quality of life can be improved by efficient mobility through land use patterns that produce greater efficiency, reduce trips, and provide more choices. Our team’s project experience includes a wide variety of transportation modes, including transit, roadways, and bicycle and pedestrian facilities. We also have the benefit of in house capabilities to complete TIA’s and parking studies.
Community Engagement – Kimley-Horn’s planning staff has developed and implemented hundreds of community engagement processes throughout the country. We understand
the dynamic nature of outreach and
have utilized a variety of engagement
techniques, including bilingual facilitation
(we have multiple bilingual staff assigned
to your project), web-based participation,
visual preference surveys, community
workshops, design charrettes, phone
surveys, focus groups, and digital and print media. Our staff is also well versed in conducting workshops for policy makers on planning topics such as mixed-use policies.
Urban Design and Streetscape – Our design professionals have provided comprehensive services for streetscape and urban design projects from design through construction. For all our publicly initiated projects, we understand the important relationship between the public and private realm and provide streetscape and urban amenities that reflect community values and needs. Kimley-Horn’s design professionals have extensive experience in streetscape and landscape plans, city and area-wide design guideline manuals, and post-entitlement streetscape design guidelines. Our focus is on creating a sense of place through appropriate scale, density, land uses, and urban amenities.
For this project we are utilizing the specialized TOD design expertise of Crandall Arambula. Crandall Arambula was established in 1998 to blend visionary planning, design acumen, and practical knowledge in the creation of vibrant and transformative urban places. The firm works across scales of development— region, city, district, corridor, neighborhood and sites—to integrate each community’s vision for growth with land use and transportation planning that balances environmental responsibility, economic vitality, and community character. Crandall Arambula has provided station area TOD plans for communities across the country including projects in Colorado, Oregon, Washington, Minnesota, and Canada. The firm’s urban design and planning efforts focus on creating compact mixed-use communities within a pedestrian-friendly environment that is supported by multimodal transportation options.
Each project that the firm completes is rooted in our expertise with the market-driven fundamentals of successful urban places and our depth of experience in implementing visionary plans. The firm’s educational, and Downey TOD Community
Meeting #1
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 14
highly visual, presentations, one-on-one meetings with key stakeholders, and use of ballot response sheets result in politically defensible plans that are supported by the community and adopted by the local agency. The Kimley-Horn Team’s inclusive approach ensures that planning and design efforts reflect the community’s vision for growth— strengthening community character and assets while promoting economic vitality.
Zoning Codes/Development Codes – Our land use regulatory experts have successfully updated zoning policy for multiple public agencies. Our team has authored comprehensive updates to zoning/development codes and provided tailored amendments, such as overlay zones, mixed-use development standards, affordable housing, and TODs.
CEQA/NEPA and Environmental Services – The Kimley-Horn
environmental services group provides complete natural resource and environmental regulatory compliance services for a broad range of practices, including land development, transportation, roadway, water resources, and aviation. Our CEQA practitioners, including biologists, environmental scientists, and engineers, are well versed in all aspects of environmental processes, from Phase I Environmental Site Assessments to California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documentation. We can take a project from conception to final build-out. An in-house environmental services group offers the advantage of closer coordination with the design team, helping to avoid problems related to miscommunication or coordination because the two groups work side-by-side every day. Our environmental specialists and engineers have learned to “speak the same language” and work together to deliver a successful project.
Parking Management Plans – Kimley-Horn has considerable experience performing major parking studies for developments and downtown districts, surface and deck designs, and access, circulation, and parking studies for planned communities, transit centers, shopping centers, universities, and other high activity multimodal centers.
Kimley-Horn develops integrated parking strategies for TODs, mixed-use, and development projects, and is often asked to research parking trends and propose innovations ranging from policies to parking management implementation plans.
Sustainability/Healthy Communities –
Sustainability and healthy communities have
become part of the lexicon of planning. Our
plans and processes seek to incorporate
sustainability and healthy communities’
concepts into our planning projects.
Complete Streets, low impact development
(LID), mobility, safe routes to school, access
to healthy food, and bike/trail planning are
examples of sustainability concepts that
have been incorporated into our planning
documents. We have provided awardwinning sustainability policies to our municipal clients, including TODs, General Plan policies, and urban infill Specific Plans.
Economics – Economic Development and sustainability is key to a successful project. Kimley-Horn has partnered with Keyser Marston, a leader in economic development and fiscal viability to provide economic support on this project. Keyser Marston will utilize primary and secondary research, existing city plans, and previous studies and reports to provide a current description of the local and regional market, economic, demographic, and employment findings. Based on their extensive experience working with local public agencies, the team will provide the City a focused study of the Project Area’s real estate development conditions and will outline specific strategies for targeted TOD.
Infrastructure Master Plans – Infrastructure analysis is an integral part of our planning processes. Our civil engineering experts utilize comprehensive analysis and existing conditions, and provide accurate forecasting of infrastructure needs. Future improvement plans are conceptually designed to identify future facilities improvements and provide the basis for local capital improvement programming and funding.
LACMTA and Grant Program Experience - Our team has recent experience with three METRO grant funded TOD Specific Plans. This provides our team with a strong familiarity with the policies, programs, and toolkits they have available for LA County jurisdictions. Many of the toolkits are based upon fundamental principles of TOD Design, development, and sustainable design. Our collective team has applied, modified, and advanced
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 15
many of these principles with our work throughout the United States.
We understand the management of grant programs and where efficiencies can be gained as he grant is administered. The Kimley-Horn Team understands the reporting requirements of the grants subject to this project and will help the city in streamlining their reporting requirements.
STRATEGY IN MANAGING SIMILAR PROJECTS
Communication is key. Accessibility and open communication are imperative steps in completing a successful project. The Kimley-Horn Team is committed to working as a team with Pico Rivera; we’re here to help.
We believe that the most effective and technically sound work products evolve through clear lines of communication between all participants. As such, we make sure that project assumptions are clearly understood by all project team members. These assumptions include each team member’s role on a project, the type of product to be prepared, and the approvals contemplated for the work program. Early and continual communication allows the team to resolve issues before they become problems leading to potential project delays and additional costs.
There are multiple ways to maintain good lines of communication, and Kimley-Horn will work with the City to determine which methods best fit the City’s style for this project. The City will have ongoing access to our Project Manager, Dave Barquist, AICP, as well as key team members, telephone and e-mail communications are monitored constantly to provide quick response. This communication will be supplemented by progress meetings with City staff and shareholders, as needed.
Schedule and QC/QA Control
Kimley-Horn insists that each project has a carefully structured scope of services, a corresponding schedule, and an accurately developed budget.
We don’t begin an assignment until these three elements are in place and mutually agreed upon by Kimley-Horn and the City. We know that schedule and quality control are equally important. A project that is behind schedule sacrifices the opportunity for quality reviews. We insist that our project managers build into their schedules adequate time for a thorough quality control review so that our project documents can be thorough, accurate, and complete.
To meet schedules and minimize down time, we move beyond a specific project schedule and work plan. To monitor our staff workload, KimleyHorn employs an intensive forecasting technique known as our “castahead” process. This effort involves assessing our project milestones and staff loading on a weekly, monthly, and six-month basis, drilling down to the project team level. This “cast-ahead” process enables us to assign ample staff and technical resources to complete each project on time and to our clients’ satisfaction.
Kimley-Horn’s formal QC/QA program is based upon assigning experienced, senior professionals who are otherwise qualified to manage a particular project, to serve in a quality control role. For the City of Pico Rivera TOD Specific Plan we have assigned two QC/QA reviewers. This fresh perspective and critical eye provides an extra layer of detailed review to provide the City the best experience possible.
Our internal QC/QA program will include:
• An internal kick-off meeting held with key team members assigned to the job to clearly define the scope, outline sub-task responsibilities, establish schedules, and identify project milestones and goals.
• At the end of each phase, a QC/QA review will be conducted as one of several final checks to make sure that the project deliverable is not only technically correct, but also consistent with your objectives. • Any changes or modifications required to respond to the comments and recommendations of the quality control team will be incorporated during the ongoing analysis prior to
submitting deliverables.
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 16
REFERENCES
Reference 1: David Blumenthal, City Planner
City of Downey, [email protected], 562.904.7151
Project: Rancho Los Amigos South Campus TOD Specific Plan, Downey, CA
Kimley-Horn was selected by the City of Downey to develop a comprehensive TOD Specific Plan that will address revitalization and reuse of the existing 171-acre Rancho Los Amigos South Campus.
The Specific Plan will establish a high-intensity regional employment center, including a future Orange Line METRO station, that incorporates residential, commercial, retail and recreational land uses. The Specific Plan will contribute to the creation of a mixed-use, compact and multimodal environment; the promotion of sustainable principles in design and development; enhancement of the pedestrian scale and function of the built environment; the establishment of a complementary mix of cultural uses, public spaces, and outdoor activities; providing stronger connections with local neighborhoods and connectivity with mobility options; the promotion of a family-oriented, culturally-enriched healthy lifestyle; the celebration and reinforcement of Downey and Rancho Los Amigos’ character and history; the enhancement of economic development successes in the area; supporting future regional transportation and transit planning objectives; and positioning the City of Downey to be highly competitive in securing grant funding and alternative funding and financing options.
To date, Kimley-Horn has completed majorly successful outreach activities within the surrounding community, and developed the land use and design strategies through extensive project area analysis. Throughout the development of the Rancho Los Amigos Specific Plan, Kimley-Horn has maintained close communication with the County of Los Angeles, METRO, and the City of Downey to ensure cohesiveness with both the County of Los Angeles’ development plans and Metro’s WSAB corridor extension to the proposed Gardendale Station within the project area. Begun in 2017, Kimley-Horn is on track to complete the project within the proposed schedule per the guidelines of the Metro TOD grant received by the City.
Reference 2: Dan Dooley, Planning Services Manager
City of Whittier, [email protected], 562.945.8200 Project: Whittier Boulevard Specific Plan, Whittier, CA Whittier Boulevard is the most visible piece of the City of Whittier.
Members of the Kimley-Horn Team assisted the City with an update to the Whittier Boulevard Specific Plan, which details the proposed land uses and their distribution, development standards, and design guidelines for new development, proposed infrastructure improvements, and implementation measures required to achieve its goals. The Specific Plan represents zoning along Whittier Boulevard that consists of five land-use districts: the Gateway Segment, Workplace District, Shopping Cluster District, Center District, and Neighborhood Spine District.
The Specific Plan area totals 640 acres and allows for a high-intensity infill mixed-use development, including residential, commercial, retail, research, medical, and transit uses. The project is located on a future METRO station, and will transition from a traditional auto dominated corridor to mixed-use “nodes” along the six-mile corridor area. Community input and workshops were key to understanding the need for multiple districts along the length of Whittier Boulevard. The project was completed in 2016.
Reference 3: Michael Behen, Transportation/
Special Projects Manager
City of Palmdale, [email protected], 661.267.5300 Project: Palmdale Active Transportation Plan, Palmdale, CA This large-scale effort addresses safe routes to schools, bike master plans, and complete streets in a comprehensive, integrated fashion. The planning effort included the conduction of community-wide workshops; custom workshops at individual school sites; and consultation with various school districts, law enforcement/public safety agencies, and other interested parties. Detailed on-site investigations were conducted on roadway segments as well as around school sites and various transportation routes within the city. The process utilized a technical advisory panel consisting of experts from various public agencies and interest groups. Project is ongoing.
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 17
ADDITIONAL REFERENCES
Reference 4: Craig Hensley, AICP, Community Development Director City of Duarte, [email protected], 626.357.7931 Project: Duarte Station Specific Plan, Duarte, CA
Kimley-Horn staff (Margit Allen) assisted in the preparation of the Duarte Station Specific Plan, a 19-acre site located in the City of Duarte. The site is bordered by Metro-owned Gold Line tracks and a planned Gold Line station that were under construction at the time of Specific Plan writing.
The Specific Plan and associated EIR were funded through a grant from METRO and was one of the first Specific Plans implemented under the grant program. The plan identified development opportunities within the project area based on transit-oriented design principles. The land use plan included high density residential uses as well as proposed mixed-use and limited retail uses near the new Gold Line station. Constraints included long-term owners and required Gold Line parking. The Specific Plan was approved in late 2013.
Reference 5: Justina Willkom, Assistant Director of Community Development
City of Tustin, [email protected], 714.573.3115
Project: Red Hill Avenue Specific Plan, Tustin, CA
The project focuses on a key corridor to the north and south of the I-5 freeway. The Specific Plan will guide future development as the City looks to revitalize the area through the creation of a mixed-use district that is pedestrian-oriented. Development of the plan included several community workshops and presentations to Planning Commission to gain feedback and ensure that the end product was a plan that could be clearly understood and implemented. The project is ongoing.
PROJECT TEAM
Team Organization
When you choose a consultant, you are choosing
the people who offer you the technical expertise,
hands-on experience with similar projects, and
commitment to a high standard of quality and
client service that will make your projects as
successful as you have envisioned. We have
carefully considered the composition of our team.
The organization chart to the right highlights our
proposed team members’ responsibilities. Roles
of key staff are indicated in our organization
chart below and key staff resumes are provided
on the following pages, followed by support staff
experience matrix. Percent participation is listed
for each team member on key individual resumes
and support staff matrix.
Project Manager
Dave Barquist, AICP*
Environmental QC/QA
Kevin Thomas, CEP, ENV-SP*
Land Use & Regulatory
Dave Barquist, AICP
Margit Allen, AICP
Nick Chen, AICP
Community Outreach
Dave Barquist, AICP
Nick Chen, ACIP
Chelsey Cooper, AICP
Josh Cortez, LEED GA
Urban Design
Crandall Arambula
Don Arambula, ASLA*
Maya Krolikowski
Economics
Keyser Marston
James Rabe*
Kevin Engstrom
Courtney Holt
Civil Engineering & Design
Jason Melchor, P.E.*
Nikki Kerry, P.E.
Aryo Rad, P.E., QSD/P
Environmental Analysis
Rita Garcia*
Brian Leung
Geoff Bishop
Transportation Planning
& Parking Analysis
Sri Chakravarthy, P.E., T.E.*
Technical Studies
Achilles Malisos*
Planning QC/QA
Margit Allen, AICP*
*Key Staff
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 18
SUPPORT STAFF EXPERIENCE AND PERCENT PARTICIPATION
Name % Participation Relevant Experience
Nick Chen, AICP
Land Use & Regulatory,
Community Outreach
7%
• Downey TOD Specific Plan
• Tustin Red Hill Corridor Specific Plan
• Encinitas Housing Element Update
Chelsey Cooper, AICP
Community Outreach 6%
• Metro NOHO to Pasadena BRT Planning and Environmental • La Quinta Systemic Safety Analysis Report
• Malibu PCH Mobility Improvements
Josh Cortez, LEED GA
Community Outreach 8%
• Downey TOD Specific Plan
• Encinitas Housing Element Update
• Liberty Community Specific Plan
Nikki Kerry, P.E.
Civil Engineering & Design 1%
• Ivy Station TOD
• Expo Metro Line
• Los Alamitos Medical Center Specific Plan
Aryo Rad, P.E., QSD/P
Civil Engineering & Design 1%
• Ramona/Valley Boulevards Intersection Improvement
• Warner Avenue Street Improvements
• South Main Street (Santa Ana) Corridor Improvements
Brian Leung
Environmental Analysis 11%
• Tustin Red Hill Corridor Specific Plan
• Santa Ana South Main Street Corridor Improvements
• Encinitas Housing Element Update
Geoff Bishop
Environmental Analysis 11%
• Riverside County Winchester Community Plan
• Murrieta Hills Specific Plan EIR
• Encinitas Housing Element Update
Maya Krolikowski
(Crandall Arambula) Urban Design 12%
• West Jordan City Center Station Area Plan, West Jordan, UT • Denver Station Area TOD Plans & Code Analysis, CO
• Aurora Station Area TOD Plans and Zoning, CO
Kevin Engstrom/Courtney Holt
(Keyser Marston) Economics 5%
• Marina Del Rey landslide and waterside redevelopment
• Acquisition of Los Angeles Union Station
• Development of Rialto Renaissance
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 19
Dave Barquist, AICP
Project Manager; Land Use & Regulatory; Community Outreach Task Lead Dave has more than 21 years of public-and private-sector planning experience including extensive work in urban design, comprehensive planning, policy analysis and development, environmental analysis, local government policy, downtown revitalization planning, parks and recreation planning, sustainability, and land use analysis. He excels in utilizing community engagement and public outreach programs to guide public policy development. David has led hundreds of public meetings and is well-versed in finding locally-specific techniques and tools to engage the community in the planning process. As an expert in crafting local government policy, David brings a multi-disciplinary approach to meeting the needs of complex planning programs, including Specific Plans, General Plans, Zoning Codes, Housing Elements, and Development Code updates.
Relevant Experience
• Rancho Los Amigos, South Campus TOD Specific Plan, Downey, CA – Project Manager • El Monte Transit Village Specific Plan, El Monte, CA – Project Manager • Downtown/Old Town Indio Specific Plan Update, Indio, CA – Project Manager • Yorba Linda General Plan Update and Community Outreach and Parks and Recreation Master Plan, Yorba Linda, CA – Project Manager
• Whittier Boulevard Specific Plan Moratorium Analysis and Amendment, Whittier, CA – Project Manager • San Jacinto Downtown Specific Plan, San Jacinto, CA– Project Manager • Route 66 Corridor Specific Plan and Community Outreach, Glendora, CA – Project Planner • Imperial Highway Corridor Specific Plan and Community Outreach, La Mirada, CA – Project Manager • Paseo San Gorgonio Specific Plan - SCAG Compass Blueprint Demonstration Project, Banning, CA – Project Manager
• CenterLine Urban Transit Corridor and Community Outreach and Transit-Supportive Development Guidelines, Orange County, CA – Project Planner
• Citywide Design Guidelines, Santa Ana, CA – Project Manager • University District Specific Plan, San Marcos, CA – Principal-in-Charge Professional Credentials
• Bachelor of Science,
Urban and Regional
Planning, California State
Polytechnic University
Pomona
• American Institute of
Certified Planners, No.
136746
• American Planning
Association
• Society of College and
University Planners
Percent Participation
12%
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 20
Kevin Thomas, CEP, ENV SP
Environmental QC/QA
Kevin has more than 30 years of experience in the environmental compliance and permitting of major infrastructure and land development projects. He has managed and prepared numerous environmental and planning studies for public and private sector clients under CEQA and NEPA, specializing in the strategic guidance, preparation, and peer review of CEQA/NEPA documents and regulatory permitting programs. He’s also managed a wide range of environmental planning projects, including environmental documents for major infrastructure and land development, air quality and noise studies, community participation programs, highly controversial hillside development, state-of- the-art visual analyses, facility siting and due diligence studies, and technical support for the California Energy Commission and California Public Utilities Commission permitting processes. Kevin draws on his broad background and understanding of environmental constraints to provide technical and CEQA compliance review and environmental documentation, in addition to research, analysis, and writing. Key industry roles provide him with unique insight into current CEQA/NEPA case law, professional practice, and regulatory programs affecting the CEQA/NEPA defensibility and project success.
Relevant Experience
• Murrieta Hills Specific Plan EIR, Murrieta, CA – Project Manager • Cypress Business Park Specific Plan and EIR, Cypress, CA – Project Director • Main Street South Specific Plan EIR, Corona, CA – Project Director • Palmdale Trade and Commercenter Specific Plan EIR, Palmdale, CA – Project Manager • Ritter Ranch Specific Plan EIR, Palmdale, CA – Project Manager • La Entrada Specific Plan EIR, Coachella, CA – Project Manager • Golden Triangle EIR and Specific Plan Review, Murrieta, CA – Project Manager • Wine Country Community Plan Program EIR, County of Riverside, CA – Project Manager • Amargosa Creek Improvement Project EIR, Palmdale, CA – Project Manager • County of Riverside General Plan Update and Program EIR, County of Riverside, CA – Project Manager • Antelope Valley Transit Authority Operations Center MND, Palmdale/FTA, CA – Project Manager • On-Call Planning Services, County of Riverside, CA – Project Manager Professional Credentials
• Bachelor of Arts,
Environmental
Engineering, University of
California, Los Angeles
• Certified Environmental
Professional #99040383
• Envision Sustainability
Professional (ENV SP)
• American Water Works
Association, California
and Nevada, Desalination
Committee
• National Association
of Environmental
Professionals
Percent Participation
1%
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 21
Margit Allen, AICP
Planning QC/QA, Land Use & Regulatory
Margit has over 30 years of planning experience, serving as an extension of agency staff for numerous municipalities to provide Specific Plan review, preparation of planning entitlements, and preparation of staff reports for project approval.
Her experience encompasses a broad array of planning projects including Specific Plans, General Plans, design guidelines, development feasibility analysis, and entitlement processing. She has been responsible for the management of specific plan and other land use planning and entitlement efforts for both the public and private sector, as well as management into construction. She possesses a background in policy planning, landscape architecture, current planning, and land planning.
Relevant Experience
• Rancho Los Amigos, South Campus TOD Specific Plan, Downey, CA – Project Planner • Duarte Station TOD Specific Plan, Duarte, CA – Project Manager • Fullerton Transit Center TOD Specific Plan, Fullerton, CA – Project Manager • Alhambra Place Mixed-use Specific Plan Amendment, Alhambra, CA – Project Manager • Rich Haven Mixed-Use Specific Plan, Ontario, CA – Project Manager • Red Hill Avenue Specific Plan and EIR, Tustin, CA – Project Manager • Avanti South Specific Plan, Lancaster, CA – Project Manager • 600 Commonwealth Specific Plan, Fullerton, CA – Project Planner • Nelles Property Project Planner, Whittier, CA – Project Planner and Manager • Heritage Valley Parks Phase 2, Fillmore, CA – Project Planner • Raytheon Specific Plan, EL Segundo, CA – Project Planner • Simi Valley Arroyo Specific Plan, Simi Valley, CA – Project Planner • Fagan Canyon Planning Services, Santa Paula, CA – Project Planner • Hamilton Army Airfield Entitlement and Planning Services, Novato, CA – Project Planner • College Park Specific Plan, Chino, CA – Project Manager • Community Planning and Design Services, County of Riverside, CA – Project Planner • Veteran’s Industrial Specific Plan (March JPA), Riverside County, CA – Project Planner Professional Credentials
• Master of Landscape
Architecture, California
State Polytechnic
University, Pomona
• Bachelor of Arts, Biology,
University of California,
San Diego
• American Institute
of Certified Planners
#008688
Percent Participation
2%
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 22
Don Arambula, ASLA (Crandall Arambula)
Urban Design Task Lead
Don is recognized nationally as a creative urban designer and planner. With over 30 years of experience, he employs his broad understanding of land use, transportation issues, and best practices to craft unique and creative urban design concepts that strengthen and build upon local context, history, emerging trends, and best practices for urban design.
He is an innovator and expert in transit-oriented development, downtown, center, and main street retail, high density residential, park, and plaza design.
Don has experience creating design guidelines, design standards and public area requirements for many communities, both as stand-alone projects and as part of an area master planning effort. His attention to detail and strong design sense give him the ability to create guidelines that are descriptive rather than prescriptive and standards that first regulate the form of the built environment. Don focuses on creating implementing tools that ensure that built projects are consistent with the community’s policy vision, planning strategies, and design concepts. He has assisted numerous cities in the development of design guidelines and form-based zoning codes.
Relevant Experience
• Shady Oak Station Area Development Strategy, Hopkins/Minnetonka, MN – Project Manager, Crandall Arambula led the creation of a District Plan establishing ‘innovation district’ land uses that differentiate the study area from other employment centers in Hopkins, Minnetonka, or other Southwest Corridor communities. The plan creates a unique market niche that is based on emerging national trends for station area and urban development and positions the a to maximize benefits of its regional location and future transit access. • Metro Gold Line BRTOD Plans, Minneapolis-St Paul, MN – Project Manager, Crandall Arambula is currently preparing Bus Rapid Transit Oriented Development (BRTOD) Plans for the planned ten-station nine-mile METRO Gateway Corridor Gold Line Bus Rapid Transit project in Ramsey and Washington counties, Minnesota. The overarching purpose of the BRTOD Plans is to coordinate planning and policy development along the entire Corridor to enhance opportunities for economic development and improve ridership. The stations are located in a wide range of community types and real estate markets; from downtown Saint Paul, to a historic urban neighborhood, to a 1970s manufactured home park, to corporate campuses,and commercial areas ready for infill and re-development opportunities. TOD potential and type varies greatly by station.
• Orenco Station Area Plan (a national model for TOD planning), Hillsboro, OR – Project Manager • Bel-Red Transit Corridor and TOD Study, Bellevue, WA – Project Manager • Downtown TOD Study, Redmond, WA – Project Manager
• Rush Line BRTOD Plans, Minneapolis-St Paul, MN – Project Manager Professional Credentials
• Bachelor of Science,
Landscape Architecture
and Regional Planning,
Colorado State University
Percent Participation
10%
Crandall Arambula
References
Elise Durbin, Community
Development Supervisor
City of Minnetonka
952.939.8285
edurbin@eminnetonka.
com
Sara Allen, Planner,
Gold Line BRTOD Plans
Manager WCRRAWashington County
Regional Rail Road
Authority
651.430.4363
Sara.Allen@
co.washington.mn.us
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 23
James Rabe (Keyser Marston’s Associates, Inc.)
Economics Task Lead
Mr. Rabe is a Senior Principal in Keyser Marston’s Los Angeles office. For more than 35 years he has provided public and private clients with real estate and financial expertise. Mr. Rabe assists clients in public/private real estate and economic development activities from Keyser Marston’s Los Angeles office. He provides public and private sector clients with services in the following areas: public finance, specific plan feasibility, fiscal impact, financial modeling, developer selection, asset management, ground leasing and deal structuring and transaction negotiation.
Relevant Experience
• Public/Private Development Specialist – Recognized as an expert in real estate advisory services, Mr. Rabe specializes in public/private transactions. Examples include the acquisition of Los Angeles Union Station, restructuring of Grand Central Market, ground lease of Orange County development site at El Toro, closure of Rialto airport to develop Rialto Renaissance, Grand Avenue project, Marina del Rey landside and waterside redevelopment, the revitalization of downtown Anaheim including the Packing House and numerous transit-oriented joint development projects. He has assisted public and private clients in the analysis and implementation of residential, commercial, industrial, office, hotel, and mixed-use projects, and master plan developments in California, Arizona and Nevada. • Additional Areas of Specialization – Mr. Rabe has consulted in all areas of the disposition process for redevelopment projects and surplus properties for public agencies, including project planning, Requests for Proposals and Qualifications, and developer selection. He has worked with planning consultants to develop feasible specific plans. He has also served as financial advisor, special tax consultant and developer’s advisor for bond issues in California.
Professional Credentials
• Master of Arts, University
of California, Los Angeles
• Bachelor of Arts in
Economics, University of
California, Los Angeles
• Counselors of Real Estate
(CRE) Member
• California Academy for
Economic Development
(CAED) Board Member
• Urban Land Institute (ULI)
Member
Percent Participation
5%
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 24
Jason Melchor, P.E.
Civil and Engineering Task Lead
Jason has 21 years of
experience in civil and traffic
engineering design projects, and
has worked with clients in Los Angeles, Orange, Riverside, and San Diego counties on all types of planning and
design projects. His traffic engineering experience includes traffic signal design, signing and striping, traffic control, street lighting, and signal interconnect and ITS design plans, and he has served as a key staff member on many
transportation studies, and traffic and civil engineering design projects. He has also acted as in-house staff for the cities of Irvine and Huntington Beach to review development studies and design plans. In that role, he worked directly with developers and City staff to provide comments on plan and document submittals.
Relevant Experience
• Traffic Management Plans for the Regional
Connector Transit Corridor Project, Los Angeles
County, CA – Project Engineer
• Santa Fe Trail Plaza Off-Site Traffic Improvements
Design, El Monte, CA – Project Engineer
• On-Call Traffic Engineering Services, City of
Downey, CA – Project Engineer
• Newport Heights Neighborhood Study, Newport
Beach, CA – Project Manager
• San Jose Business Park Traffic Impact Study, West
Covina, CA – Project Engineer
• Conejo Spectrum Traffic Impact Study, Thousand
Oaks, CA – Project Engineer
• Red Hill Technology Center Traffic Impact Study,
Santa Ana, CA – Project Engineer
Professional Credentials
• Bachelor of Science,
Civil Engineering;
Specialization in
Transportation, University
of California, Irvine
• Professional Engineer in
California #65218
Rita Garcia
Environmental Analysis Task Lead
With nearly 30 years of
experience, Rita Garcia has
provided environmental and
planning services to a broad range of public and private sector clients. As Technical Manager, Ms. Garcia has gained considerable experience managing and contributing to
CEQA/NEPA compliance and policy/planning documentation.
She has been involved with varied development and
redevelopment, and facility and infrastructure projects in sensitive environments with substantial public involvement and controversy.
Relevant Experience
• Rancho Los Amigos, South Campus TOD Specific
Plan, Downey, CA – Environmental Analyst
• Clean Water Factory Project EIR, San Bernardino,
CA – Environmental Analyst
• Metropolitan Water District Reservoir
Reconnaissance Study, San Bernardino, CA –
Project Manager
• Housing Element Update EIRs, Palmdale and
Riverside, CA – Project Manager
• N. Downtown Lancaster Neighborhood
Revitalization/Transit Village Plan & EIR/EA,
Lancaster, CA – Senior Environmental Analyst
Professional Credentials
• Bachelor of Science,
Urban and Regional
Planning, California State
Polytechnic University,
Pomona
Percent Participation
4%
Percent Participation
2%
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 25
Sri Chakravarthy, P.E., T.E.
Transportation Planning & Parking Analysis Task Lead
Sri has more than 14 years
of traffic operations and
transportation engineering
experience. Since beginning his career with Los Angeles County prior to joining Kimley-Horn, Sri has participated in a wide variety of traffic signal synchronization, ITS, TIA’s, operations projects, and on-call traffic engineering services. His project management experience includes
traffic signal operations, traffic signal design, traffic impact studies, corridor planning, signal justification studies, sitespecific traffic circulation and safety studies. His key areas of expertise include traffic signal timing, signal design, ITS, transportation modeling, grant applications, and statistical analysis.
Relevant Experience
• Ivy Station TOD, Culver City, CA – Project Manager
• North Hollywood Station, North Hollywood, CA –
Project Engineer
• Whittier Boulevard Specific Plan, Whittier, CA –
Project Engineer
• Paramount Boulevard Fiber Optic Communication
System, Downey, CA – Project Manager
• Imperial Highway Fiber Optic Communication
System, Downey, CA – Project Engineer
• Chapman Avenue Corridor Traffic Signal
Synchronization Project (TSSP), Orange County,
CA – Project Manager
• PCH (Route 1) Mobility Improvements at Various
Locations, Malibu, CA – Project Engineer
Professional Credentials
• Master of Science, Civil
Engineering, Louisiana
State University
• Professional Civil
Engineer in California,
#73629
• Professional Traffic
Engineer in California,
#2531
Percent Participation
2%
Percent Participation
2%
Achilles Malisos
Technical Studies Task Lead
Achilles (Ace) has more than
13 years of experience as an
environmental analyst with a
specialty in acoustics, air quality, and climate change. Ace is responsible for preparing and managing environmental and planning studies for public and private sector clients, under the CEQA and NEPA for a variety of environmental planning projects involving redevelopment, infrastructure, residential, mixed-use, institutional, and commercial uses.
Relevant Experience
• Palmdale TOD Overlay EIR, Palmdale, CA – Air
Quality/GHG/Noise Analyst
• Palmdale Transit Village Specific Plan EIR,
Palmdale, CA – Air Quality/GHG/Noise Analyst
• Lancaster Downtown Specific Plan EIR, Lancaster,
CA – Air Quality/GHG/Noise Analyst
• SCAG Antelope Valley Rural Smart Growth Plan,
Antelope Valley, CA – Air Quality/GHG/Noise Analyst
• Monterey Downs and Horse Park and Central
Coast Veterans Cemetery Specific Plan EIR,
Seaside, CA – Air Quality/GHG/Noise Analyst
• Lancaster General Plan EIR, Lancaster, CA– Air
Quality/GHG/Noise Analyst
Professional Credentials
• Master of Arts, Urban
and Regional Planning,
University of Irvine
• Bachelor of Arts,
Environmental Studies,
University of California,
Santa Cruz
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS Month
Task 2019 2020 2021
Notice to Proceed Anticipated 3/1/2019
Task 1 - Kick-off & Project Management
Task 2 - Plan Framework and Station Area Analysis
Task 3 - Draft Specific Plan, GP, and Zoning Recommendation Task 4 - Prepare Planning Documents
Task 5 - Environmental Compliance
End Date 2/1/2021
We have provided adequate time (up to 3 weeks) for staff review after each deliverable.
City of Pico Rivera | LPPL77001.19 26
PROJECT SCHEDULE
Staying on schedule and meeting deadlines is a high priority for the Kimley-Horn Team. Critical elements in maintaining schedules include a clear definition of the responsibilities of team members and frequent communication relative to achieve goals in the work effort. Thus, schedule control begins with the preparation of a detailed schedule in Microsoft Project that includes milestone completion dates for specific tasks and the overall project. The schedule identifies task dependencies and relationships, which allows our project managers and clients to understand which tasks must be completed so that other tasks may be accomplished. We will develop for your project, a work plan that allocates commitments by individuals for each task. Twice monthly, our Management Information System generates a Project Effort Report showing effort expended by task. This internal control allows us to make, on a timely basis, any adjustments that may be necessary to maintain schedule and stay within budget.
Kick-off Meeting Community Meeting Deliverable
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 27
Kimley-Horn Keyser
Marston
Crandall
Arambula
Name
Dave Barquist
Sr. Professional III
Sr. Professional II
Sr. Professional I
Professional II
Professional I
Analyst
Project Support
Kevin Engstrom
Courtney Holt
Don Arambula
May Krolikowski
Category/ Title
Project Manager
Direct
Rate
$75.96$91.47$77.60$65.11$58.66$48.57$38.24$31.74
$118
$79.33$54.60$26.81
Billing Rate
$246.65$297.01$251.97$211.42$190.47$157.71$124.17$103.06$343.97$231.25$180.18 $88.47
Total
Hours Total Cost
Task
1 PROJECT KICK-OFF AND EXISTING CONDITIONS ANALYSIS Task 1 Hours
Task 1 Cost
47 10 26 6 0 66 40 20 6 12 33 48 $54,850.46
1.1 Project Area Planning – Scoping/Kick-off Meeting, PM 6 4 12 8 20 6 12 4 72 $12,994.42
1.2 Existing Conditions Inventory/ Analysis of Area 4 6 6 8 20 14 24 82 $12,157.77
1.3 Develop Community Engagement Infrastructure 6 12 18 $3,372.41
1.4 Focus Group Discussions 5 4 8 4 21 $4,403.68
1.5 Conduct Business and Property Owner Interviews 6 8 14 $2,741.57
1.6 LACMTA Policy Collaboration Meeting 6 4 4 8 22 $3,539.21 BUDGET
AND BUDGET
NARRATIVE
For billing reasons
Kimley-Horn staff are broken
up into Professional Levels. For
example, Achilles Malisos is
Senior Professional II, Chelsey
Cooper is Professional I, and
Brian Leung is Analyst. These
levels are represented to
the right.
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 28
1.7 Community Meeting #1 –
Visioning Session/Charrettes 8 8 8 12 7 16 59 $9,417.44
1.8 Briefing with Elected Officials and Study Session 6 6 8 6 26 $6,223.98 Task
2 PLAN FRAMEWORK AND STATION AREA ANALYSIS Task 2
Hours
Task 2 Cost
19 0 78 0 0 180 158 0 26 70 40 48 $108,931.02
2.1 Analysis of Opportunity Sites 4 8 8 18 28 16 8 90 $20,521.15
2.2 Conduct Market and
Development Feasibility Study 4 8 42 54 $13,450.85
2.3 Conduct Parking Study and
Parking Management Plan 35 100 70 205 $33,281.82
2.4 Mobility Assessment 35 56 64 16 24 195 $30,603.72
2.5 Community Workshop #2 7 12 24 8 16 67 $9,456.05
2.6 Briefing with Elected Officials and Study Session 4 4 8 $1,617.43 Task
3 DRAFT SPECIFIC PLAN AND GENERAL PLAN/ZONING RECOMMENDATIONS Task 3 Hours
Task 3 Cost
39 5 0 0 0 35 20 0 24 42 170 285 $92,919.84
3.1 Development of Land Use Plan 4 8 61 106 179 $22,617.07
3.2 Prepare Development Stan- dards, Design Guidelines, Public Improvements25 13 56 98 192 $26,976.56
3.3 Implementation Action Plan 4 5 8 24 42 41 51 175 $33,600.45
3.4 Community Workshop #3 6 6 20 12 30 74 $9,725.76
Kimley-Horn Keyser
Marston
Crandall
Arambula
Dave Barquist
Professional III
Sr. Professional II
Sr. Professional I
Professional II
Professional I
Analyst
Project Support
Kevin Engstrom
Courtney Holt
Don Arambula
May Krolikowski
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 29
Task
4 PREPARE PLANNING DOCUMENTS Task 4
Hours
Task 4 Cost
67 16 5 0 0 84 176 8 0 0 45 104 $75,772.09
4.1 Prepare Draft TOD Specific Plan 36 9 5 60 120 29 67 326 $48,327.73
4.2 Prepare Draft General Plan Land Use Policy Map and Zoning 3 4 16 23 $3,357.47
4.3 Release Draft TOD Specific Plan to the Public 6 8 4 16 34 $4,440.62
4.4 Planning Commission Public Hearings 8 6 12 26 $4,409.46
4.5 City Council Public Hearings 6 6 12 24 $3,916.16
4.6 Finalize General Plan Land Use
Policy Map and TOD Specific Plan 8 7 8 16 12 21 72 $11,320.64 Task
5 ENVIRONMENTAL COMPLIANCE Task 5
Hours
Task 5 Cost
0 13 102 16 40 106 320 0 0 0 0 0 $97,014.95
5.1 Prepare Initial Study, Notice of Preparation 2 4 12 18 $3,091.92
5.2 Public Scoping Meeting 2 8 10 $2,609.80
5.3 Screencheck Draft EIR 2 30 8 40 60 180 320 $49,276.30
5.4 Public Draft EIR and Public
Review 2 30 8 20 40 100 $17,965.45
5.5 Prepare Responses to Comments 2 6 10 18 $2,781.96
5.6 Prepare Draft and Final MMP 3 6 16 25 $4,389.55
Kimley-Horn Keyser
Marston
Crandall
Arambula
Dave Barquist
Professional III
Sr. Professional II
Sr. Professional I
Professional II
Professional I
Analyst
Project Support
Kevin Engstrom
Courtney Holt
Don Arambula
May Krolikowski
PROPOSAL FOR
Consultant Services for preparation of a Transit Oriented Development (TOD) Specific Plan for the
GOLD LINE EASTSIDE EXTENSION AT WASHINGTON AND ROSEMEAD BOULEVARDS City of Pico Rivera | LPPL77001.19 30
• Dedicated full-time staff member set apart to coordinate the project, and be sure there is adequate staff to perform the contracted work is Dave Barquist, AICP, the project manager, whose information is on the Cover Letter on page 1. • The fee proposed in the Budget and Budget Narrative section of this proposal is valid for 90 days from the date of submittal.
Nikki Kerry, P.E., Principal/Senior Vice President of
Kimley-horn is authorized to bind the firm.
5.7 Prepare Final EIR 8 20 30 58 $8,895.02
5.8 Planning Commission Public Hearings 8 16 24 $4,002.47
5.9 City Council Public Hearings 8 16 24 $4,002.47
TOTAL HOURS 172 44 211 22 40 471 714 28 56 124 288 485 655 Subtotal Labor:
$42,423.36 $13,068.42 $53,166.23
$4,651.17 $7,618.93
$74,281.50 $88,655.92
$2,885.74
$19,262.32 $28,675.98$51,891.84 $42,907.95
$429,488.36
Other Direct Costs (ODC) Subs $750.00 $7,500.00 $8,250.00 Other Direct Costs (ODC) Kimley-Horn $1,750.00 $1,750.00 TOTAL COST: $439,488.36
Kimley-Horn Keyser
Marston
Crandall
Arambula
Dave Barquist
Professional III
Sr. Professional II
Sr. Professional I
Professional II
Professional I
Analyst
Project Support
Kevin Engstrom
Courtney Holt
Don Arambula
May Krolikowski
Contact
Dave Barquist, AICP
765 The City Drive, Suite 200
Orange, CA 92868
TEL 714.705.1317
[email protected]
www.kimley-horn.com
To: Mayor and City Council
From: City Manager
Meeting Date: March 24, 2026
Subject: TREASURER’S MONTHLY INVESTMENT TRANSACTION
REPORT AS OF FEBRUARY 28, 2026
Recommendation:
1. Receive and file the Treasurer’s Monthly Investment Transaction Report as of February 28, 2026.
Strategic Priority:
1 - Fiscal & Organizational Sustainability - Create a City government built to adapt to change.
Strategy:
1.1 Build a more transparent and sustainable fiscal system to improve trust and efficiency.
Fiscal Impact:
There is no fiscal impact to the General Fund.
Background:
Per the City of Pico Rivera (City) Investment Policy, approved by the City Council on April 8, 2025, the City Treasurer submits a monthly investment transaction report to the City Council within 45 days following the end of the reporting period, in accordance with California Government Code Section 53607.
Discussion:
This report provides the City Council with updates on the City’s monthly transactions within the investment portfolio for the month ending February 28, 2026. The enclosed statements include transaction activity for the City’s investments with the Local Agency Investment Fund (LAIF), Chandler Asset Management, and Commercial Bank of California (Enclosures 1, 2, and 3).
10 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
TREASURER’S MONTHLY INVESTMENT TRANSACTION REPORT AS OF FEBRUARY 28, 2026
On May 16, 2025, Moody’s downgraded the United States’ sovereign credit rating from Aaa to Aa1 with a Stable outlook due to rising federal debt and long-term fiscal pressures.
The United States is currently rated Aa1 by Moody’s and AA+ by both Standard & Poor’s and Fitch. While federal agency securities are not direct obligations of the U.S. Treasury, they continue to maintain very high credit quality and strong market liquidity. Staff will continue to monitor credit conditions and coordinate with the City’s investment advisor to ensure the City’s investment portfolio remains sound and consistent with the Investment Policy.
Conclusion:
As of February 28, 2026, the City’s investment portfolio remains highly rated, liquid, and stable. All investments are maintained in accordance with California Government Code Section 53601 and the City’s Investment Policy, which the City Council approved on April 8, 2025.
Steve Carmona
SC:JA:YL:ep
Enclosure(s):1) LAIF Statement for the Month Ending February 28, 2026 2) Chandler Asset Management Transaction Ledger for the Month Ending February 28, 2026
3) Commercial Bank of California Insured Cash Sweep Statement for the Month Ending February 28, 2026
Local Agency Investment Fund
P.O. Box 942809
Sacramento, CA 94209-0001
(916) 653-3001
March 02, 2026
LAIF Home
PMIA Average Monthly
Yields
CITY OF PICO RIVERA
DIRECTOR OF FINANCE/ADMINISTRATIVE SVCS
6615 PASSONS BLVD
PICO RIVERA, CA 90660
Account Number: 98-19-653
February 2026 Statement
Tran Type Definitions
Account Summary
Total Deposit: 0.00 Beginning Balance: 69,606,854.66
Total Withdrawal: 0.00 Ending Balance: 69,606,854.66
3/2/26, 5:01 PM LAIF Regular Monthly Statement
https://laifms.treasurer.ca.gov/RegularStatement.aspx 1/1 Enclosure 1
10a
Local Agency Investment Fund
P.O. Box 942809
Sacramento, CA 94209-0001
(916) 653-3001
March 02, 2026
LAIF Home
PMIAAverage Monthly
Yields
CITY OF PICO RIVERA
COVID RELIEF EMERGENCY ACCOUNT
DIR OF FINANCE/ADMIN SERVICES
6615 PASSONS BLVD
PICO RIVERA, CA 90660
Account Number: 19-19-007
February 2026 Statement
Tran Type Definitions
Account Summary
Total Deposit: 0.00 Beginning Balance: 6,271,168.40
Total Withdrawal: 0.00 Ending Balance: 6,271,168.40
3/2/26, 5:01 PM LAIF Regular Monthly Statement
https://laifms.treasurer.ca.gov/RegularStatement.aspx 1/1 Settlement Date
Transaction
Category Transaction Type Security Description Quantity Price Principal Interest Total Amount 2/12/2026 Acquisitions Buy VISA INC 3.8 02/12/2029 275,000.00 274,683.75 0.99885 - 274,683.75 2/12/2026 Acquisitions Buy FHMS K-100 A2 2.673 09/25/2029 256,000.00 245,830.00 0.96027 209.09 246,039.092/13/2026 Acquisitions Buy ALPHABET INC 3.7 02/15/2029 130,000.00 129,528.10 0.99637 - 129,528.10 2/17/2026 Acquisitions Buy FIRST AMER:GVT OBLG Y 1.00000 1,258,517.37 1,258,517.37 - 1,258,517.372/27/2026 Acquisitions Buy UNITED STATES TREASURY 3.5 02/15/2029 550,000.00 550,601.56 1.00109 638.12 551,239.68 2/11/2026 Dispositions Sell NATIONAL RURAL UTILITIES COOPERATIVE FINANCE COR 1.01205 400,000.00 404,820.00 (5,475.56) (410,295.56) 2/15/2026 Dispositions Maturity UNITED STATES TREASURY 4.0 02/15/2026 350,000.00 1.00000 350,000.00 - (350,000.00) 2/19/2026 Dispositions Sell FIRST AMER:GVT OBLG Y 1.00000 1,204,336.28 1,204,336.28 - (1,204,336.28) 2/25/2026 Dispositions Sell TORONTO-DOMINION BANK 5.532 07/17/2026 125,000.00 125,796.25 1.00637 (729.92) (126,526.17) 2/25/2026 Dispositions Sell TORONTO-DOMINION BANK 5.264 12/11/2026 160,000.00 161,868.80 1.01168 (1,731.27) (163,600.07) 2/1/2026 Other Transactions Principal Paydown FHMS K-063 A2 3.43 01/25/2027 - - 725.47 - 725.47 2/1/2026 Other Transactions Principal Paydown FHMS K-069 A2 3.187 09/25/2027 - - 838.70 - 838.702/1/2026 Other Transactions Principal Paydown FHMS K-087 A2 3.771 12/25/2028 - - 328.89 - 328.89 2/1/2026 Other Transactions Coupon FHMS K-063 A2 3.43 01/25/2027 - - - - 924.802/1/2026 Other Transactions Coupon FHMS K-069 A2 3.187 09/25/2027 - - - - 1,287.37 2/1/2026 Other Transactions Coupon FHMS K-073 A2 3.35 01/25/2028 - - - - 1,312.08 2/1/2026 Other Transactions Coupon FHMS K-081 A2 3.9 08/25/2028 - - - - 503.75 2/1/2026 Other Transactions Coupon FHMS K-082 A2 3.92 09/25/2028 - - - - 620.672/1/2026 Other Transactions Coupon FHMS K-083 A2 4.05 09/25/2028 - - - - 776.252/1/2026 Other Transactions Coupon FHMS K-085 A2 4.06 10/25/2028 - - - - 930.422/1/2026 Other Transactions Coupon FHMS K-087 A2 3.771 12/25/2028 - - - - 915.01 2/1/2026 Other Transactions Coupon FHMS K-090 A2 3.422 02/25/2029 - - - - 941.05 2/1/2026 Other Transactions Coupon FHMS K-746 A2 2.031 09/25/2028 - - - - 710.85 2/1/2026 Other Transactions Coupon INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVE - - 1.75 - 8,095.50 2/1/2026 Other Transactions Coupon INTER-AMERICAN DEVELOPMENT BANK 4.375 02/01/2027 - - - 0.01 13,890.63 2/1/2026 Other Transactions Coupon REALTY INCOME CORP 3.95 02/01/2029 - - - - 3,154.51 2/6/2026 Other Transactions Management Fee Cash 2,788.03 - 2,788.03 - (2,788.03) 2/9/2026 Other Transactions Coupon APPLE INC 3.35 02/09/2027 - - - - 6,700.00 2/14/2026 Other Transactions Coupon FEDERAL FARM CREDIT BANKS FUNDING CORP 4.5 08/14/2 - - - - 7,087.50 2/15/2026 Other Transactions Principal Paydown JDOT 2022-B A3 3.74 02/16/2027 - - 5,425.55 - 5,425.55 2/15/2026 Other Transactions Principal Paydown JDOT 2022-C A3 5.09 06/15/2027 - - 10,618.39 - 10,618.39 2/15/2026 Other Transactions Principal Paydown MBART 2023-1 A3 4.51 11/15/2027 - - 3,647.03 - 3,647.03 2/15/2026 Other Transactions Principal Paydown HART 2023-A A3 4.58 04/15/2027 - - 7,802.87 - 7,802.87 2/15/2026 Other Transactions Principal Paydown JDOT 2023-C A3 5.48 05/15/2028 - - 20,310.59 - 20,310.59 2/15/2026 Other Transactions Principal Paydown TAOT 2024-A A3 4.83 10/16/2028 - - 8,699.86 - 8,699.86 2/15/2026 Other Transactions Principal Paydown MBALT 2024-B A3 4.23 02/15/2028 - - 6,744.10 - 6,744.10 2/15/2026 Other Transactions Coupon UNITED STATES TREASURY 1.625 08/15/2029 - - - - 1,625.00 2/15/2026 Other Transactions Coupon JDOT 2022-B A3 3.74 02/16/2027 - - - - 28.17 2/15/2026 Other Transactions Coupon JDOT 2022-C A3 5.09 06/15/2027 - - - - 173.45 2/15/2026 Other Transactions Coupon HONEYWELL INTERNATIONAL INC 4.95 02/15/2028 - - - - 9,900.00 2/15/2026 Other Transactions Coupon MBART 2023-1 A3 4.51 11/15/2027 - - - - 85.57 2/15/2026 Other Transactions Coupon UNITED STATES TREASURY 4.0 02/15/2026 - - - - 7,000.00 2/15/2026 Other Transactions Coupon HART 2023-A A3 4.58 04/15/2027 - - - - 71.20 2/15/2026 Other Transactions Coupon AMXCA 2023-1 A 4.87 05/15/2026 - - - - 527.58 2/15/2026 Other Transactions Coupon CHAIT 2023-1 A 5.16 09/15/2028 - - - - 1,483.50 2/15/2026 Other Transactions Coupon JDOT 2023-C A3 5.48 05/15/2028 - - - - 881.00 2/15/2026 Other Transactions Coupon AMXCA 2023-3 A 5.23 09/15/2026 - - 0.01 - 1,503.62 City of Pico Rivera Portfolio
Chandler Investment Transactions
February 2026
Enclosure 2
10b
Settlement Date
Transaction
Category Transaction Type Security Description Quantity Price Principal Interest Total Amount City of Pico Rivera Portfolio
Chandler Investment Transactions
February 2026
2/15/2026 Other Transactions Coupon TAOT 2024-A A3 4.83 10/16/2028 - - - - 532.91 2/15/2026 Other Transactions Coupon MBALT 2024-B A3 4.23 02/15/2028 - - 0.01 - 475.88 2/15/2026 Other Transactions Coupon HART 2024-C A3 4.41 05/15/2029 - - 0.01 - 532.88 2/15/2026 Other Transactions Coupon WFCIT 2025-1 A 4.34 05/15/2030 - - - - 1,519.00 2/15/2026 Other Transactions Coupon BACCT 2025-1 A 4.31 05/15/2030 - - 0.01 - 1,497.73 2/15/2026 Other Transactions Coupon UNITED STATES TREASURY 3.625 08/15/2028 - - 0.01 - 13,140.63 2/15/2026 Other Transactions Coupon TAOT 2026-A A3 3.86 09/15/2030 - - - - 360.27 2/15/2026 Other Transactions Coupon MBALT 2026-A A3 3.93 01/15/2030 - - - - 262.00 2/16/2026 Other Transactions Principal Paydown GMCAR 2023-2 A3 4.47 02/16/2028 - - 4,842.68 - 4,842.68 2/16/2026 Other Transactions Coupon GMCAR 2023-2 A3 4.47 02/16/2028 - - - - 150.71 2/16/2026 Other Transactions Coupon GMCAR 2024-4 A3 4.4 08/16/2029 - - - - 366.67 2/20/2026 Other Transactions Principal Paydown GMALT 2024-2 A3 5.39 07/20/2027 - - 15,628.57 - 15,628.57 2/20/2026 Other Transactions Coupon GMALT 2024-2 A3 5.39 07/20/2027 - - - - 424.28 2/20/2026 Other Transactions Coupon VZMT 2025-3 A1A 4.51 03/20/2030 - - 0.01 - 958.37 2/20/2026 Other Transactions Coupon GMALT 2025-2 A3 4.58 05/22/2028 - - - - 610.67 2/21/2026 Other Transactions Principal Paydown HAROT 2023-1 A3 5.04 04/21/2027 - - 3,176.94 - 3,176.94 2/21/2026 Other Transactions Coupon HAROT 2023-1 A3 5.04 04/21/2027 - - - - 54.30 2/25/2026 Other Transactions Principal Paydown BMWOT 2024-A A3 5.18 02/26/2029 - - 9,084.32 - 9,084.32 2/25/2026 Other Transactions Custody Fee Cash 272.76 - 272.76 - (272.76) 2/25/2026 Other Transactions Coupon BMWOT 2024-A A3 5.18 02/26/2029 - - - - 572.48 2/25/2026 Other Transactions Coupon BMWOT 2025-A A3 4.56 09/25/2029 - - - - 836.00 2/26/2026 Other Transactions Coupon CISCO SYSTEMS INC 4.8 02/26/2027 - - - - 4,200.00 2/28/2026 Other Transactions Dividend FIRST AMER:GVT OBLG Y (1.00) - - - 986.46 2/28/2026 Other Transactions Coupon UNITED STATES TREASURY 4.0 02/28/2030 - - - - 10,000.00 2/28/2026 Other Transactions Coupon UNITED STATES TREASURY 3.625 08/31/2030 - - - - 9,062.50 Change in Cash, Payables, Receivables (277,436.40)Changes of Market Values and Accrued Interests 58,419.11Net Investment Transactions $ 198,719.01Beginning Balance as of 1/31/2026 35,617,673.77Ending Balance as of 2/28/2026 $ 35,816,392.78 Contact Us
(714) 431-7000
Account
CITY OF PICO RIVERA
Date
02/28/2026
Page
1 of 5
IntraFi Cash ServiceSM, or ICS®, Monthly Statement
The following information is a summary of activity in your account(s) for the month of February 2026 and the list of FDIC-insured institution(s) that hold your deposits as of the date indicated. These deposits have been placed by us, as your agent and custodian, in deposit accounts through IntraFi Cash Service. Funds in your deposit accounts at the FDIC-insured institutions at which your funds have been placed will be "deposits," as defined by federal law. Certain conditions must be satisfied for "pass-through" FDIC deposit insurance coverage to apply. To meet the conditions for pass-through FDIC deposit insurance, deposit accounts at FDIC-insured banks in IntraFi's network that hold deposits placed using an IntraFi service are titled, and deposit account records are maintained, in accordance with FDIC regulations for pass-through coverage.
Summary of Accounts
Account ID Deposit Option Interest Rate Opening Balance Ending Balance *********354 Savings 4.05% $27,725,211.33 $27,902,352.68 TOTAL $27,725,211.33 $27,902,352.68
CONTAINS CONFIDENTIAL INFORMATION IntraFi and ICS are registered service marks, and IntraFi Cash Service is a service mark, of IntraFi Network LLC. !NrHV!X#Pm/Y#E)[A+
LM
BNB&2/ztTr.bV
0]J1
M|3EEM:T2
3+
q1qQQ1QqQq1QQQ1Q
Commercial Bank of California
19752 MacArthur Blvd.
Suite 100
Irvine, CA 92612
141442-02A
CITY OF PICO RIVERA
6615 PASSIONS BLVD
PICO RIVERA, CA 90660
66423
RETURN SERVICE REQUESTED
Enclosure 3
10c
DETAILED ACCOUNT OVERVIEW
Account ID: *********354
Account Title: CITY OF PICO RIVERA
Account Summary - Savings
Statement Period 2/1-2/28/2026 Average Daily Balance $24,792,424.40 Previous Period Ending Balance $27,725,211.33 Interest Rate at End of Statement Period 4.05% Total Program Deposits 5,900,008.61 Annual Percentage Yield Earned 4.13% Total Program Withdrawals (5,800,000.00) YTD Interest Paid 148,749.33 Interest Capitalized 77,132.74
Current Period Ending Balance $27,902,352.68
Account Transaction Detail
Date Activity Type Amount Balance
02/02/2026 Withdrawal ($3,000,000.00) $24,725,211.33
02/03/2026 Deposit 8.61 24,725,219.94
02/05/2026 Deposit 800,000.00 25,525,219.94
02/10/2026 Interest Capitalization 219.45 25,525,439.39 02/12/2026 Withdrawal (1,100,000.00) 24,425,439.39
02/19/2026 Withdrawal (1,700,000.00) 22,725,439.39
02/26/2026 Deposit 5,100,000.00 27,825,439.39
02/26/2026 Interest Capitalization 329.64 27,825,769.03 02/27/2026 Interest Capitalization 76,583.65 27,902,352.68 Summary of Balances as of February 28, 2026
FDIC-Insured Institution City/State FDIC Cert No. Balance Amalgamated Bank New York, NY 622 $247,768.61
American National Bank Omaha, NE 19300 247,768.63
Ameris Bank Atlanta, GA 20504 247,768.63
Anderson Brothers Bank Mullins, SC 9923 247,768.63
Arrow Bank N.A. Glens Falls, NY 7074 247,768.57
BOKF, National Association Tulsa, OK 4214 247,768.63
Banc of California Los Angeles, CA 24045 247,384.53
Banesco USA Miami, FL 57815 247,768.63
Bangor Savings Bank Bangor, ME 18408 247,082.22
Bank of Ann Arbor Ann Arbor, MI 34120 247,768.61
Bank of Baroda New York, NY 33681 198.60
Bank of Central Florida Lakeland, FL 58479 247,768.60
Bank of China New York, NY 33653 247,768.63
Bank of Marin Novato, CA 32779 247,768.61
Bank of Springfield Springfield, IL 19506 247,768.59
Bank of the Valley Bellwood, NE 25291 247,082.22
BankUnited Miami Lakes, FL 58979 494.43
Bankers Trust Company Des Moines, IA 953 27.51
Date
02/28/2026 Page
2 of 5
CONTAINS CONFIDENTIAL INFORMATION IntraFi and ICS are registered service marks, and IntraFi Cash Service is a service mark, of IntraFi Network LLC. !NvDV!X#Pm/Y#E)[A+
LM
BNC'5y-}k
q"dV
0]L6
8sNb_x!r
4+
qQQQ1Q1qqqQQq1Q1Q
DETAILED ACCOUNT OVERVIEW
Account ID: *********354
Account Title: CITY OF PICO RIVERA
Summary of Balances as of February 28, 2026
FDIC-Insured Institution City/State FDIC Cert No. Balance Barclays Bank Delaware Wilmington, DE 57203 247,768.63
Beacon Bank & Trust Boston, MA 17798 247,548.71
Bristol County Savings Bank Taunton, MA 23622 302.22
Busey Bank Champaign, IL 16450 247,082.22
Byline Bank Chicago, IL 20624 247,768.63
CNB Bank Clearfield, PA 13876 247,768.57
Cambridge Savings Bank Cambridge, MA 17870 247,741.05
Capital Bank, National Association Rockville, MD 35278 247,768.57 Capitol Bank Madison, WI 34074 494.41
Citizens Bank of Kansas Kingman, KS 4707 247,768.57
Citizens Bank of Philadelphia, MS Philadelphia, MS 12204 247,668.05 Citizens Bank, National Association Providence, RI 57957 247,658.91 City National Bank of Florida Miami, FL 20234 247,768.63 Coastal Carolina National Bank Myrtle Beach, SC 58864 247,768.63 Coastal Community Bank Everett, WA 34403 247,768.63
Cogent Bank Orange City, FL 34908 247,686.83
Columbia Bank Roseburg, OR 17266 247,768.63
Community Bank, N.A. Canton, NY 6989 247,768.61
ConnectOne Bank Englewood Cliffs, NJ 57919 247,109.81
Customers Bank Malvern, PA 34444 247,768.63
Dime Community Bank Hauppauge, NY 6976 247,768.63
EagleBank Silver Spring, MD 34742 247,768.60
East West Bank Pasadena, CA 31628 247,100.29
Eastern Bank Boston, MA 32773 247,768.55
Enterprise Bank & Trust Clayton, MO 27237 247,768.63
Equity Bank Andover, KS 25858 247,768.57
Esquire Bank, National Association Jericho, NY 58140 247,082.22 Farmers State Bank Cameron, MO 13897 247,768.56
First Bank of the Lake Osage Beach, MO 26960 27.54
First Financial Bank Abilene, TX 3066 247,768.63
First Horizon Bank MEMPHIS, TN 4977 247,768.60
First Mid Bank & Trust N.A. Mattoon, IL 3705 247,768.63 First National Bank of Omaha Omaha, NE 5452 27.54
First National Bank of Pennsylvania Greenville, PA 7888 247,768.63 First United Bank and Trust Company Durant, OK 4239 247,768.57 First Western Trust Bank Denver, CO 57607 247,768.57
First-Citizens Bank & Trust Company Raleigh, NC 11063 247,768.63 FirstBank Nashville, TN 8663 247,768.63
Five Star Bank Roseville, CA 35361 247,768.63
Date
02/28/2026 Page
3 of 5
CONTAINS CONFIDENTIAL INFORMATION IntraFi and ICS are registered service marks, and IntraFi Cash Service is a service mark, of IntraFi Network LLC. 66423
DETAILED ACCOUNT OVERVIEW
Account ID: *********354
Account Title: CITY OF PICO RIVERA
Summary of Balances as of February 28, 2026
FDIC-Insured Institution City/State FDIC Cert No. Balance Flagstar Bank, N.A. Hicksville, NY 32541 247,768.63
Flatirons Bank Boulder, CO 57280 247,686.69
Flushing Bank Uniondale, NY 58564 247,768.63
Franklin Bank & Trust Company Franklin, KY 17937 247,741.05 Gateway First Bank Jenks, OK 15118 247,082.22
Grand Savings Bank Grove, OK 32084 247,768.63
Grasshopper Bank, N.A. New York, NY 59113 247,109.81
Great Southern Bank Reeds Spring, MO 29546 27.58
Hingham Institution for Savings Hingham, MA 90211 247,109.81 InterBank Oklahoma City, OK 27210 247,768.57
KS StateBank Manhattan, KS 19899 247,768.59
Kennebunk Savings Bank Kennebunk, ME 13063 247,082.22
Labette Bank Altamont, KS 17068 0.04
Leader Bank, National Association Arlington, MA 57134 247,604.39 Liberty National Bank Lawton, OK 11522 274.72
Merchants Bank of Indiana Carmel, IN 8056 247,768.57
Mid Penn Bank Millersburg, PA 9889 247,768.63
MidFirst Bank Oklahoma City, OK 4063 247,741.31
Midwest Regional Bank Festus, MO 8889 247,082.22
Mission Valley Bank Sun Valley, CA 57101 79.27
New Valley Bank & Trust Springfield, MA 59143 247,741.34 NexBank Dallas, TX 29209 247,768.63
Oakstar Bank Springfield, MO 58115 247,768.55
Old National Bank Evansville, IN 3832 247,768.61
Origin Bank Ruston, LA 12614 247,768.57
Peoples Bank Marietta, OH 6544 247,768.57
PeoplesBank Holyoke, MA 90213 247,576.59
Pinnacle Bank Nashville, TN 35583 247,768.63
Pioneer Bank Mapleton, MN 5193 247,768.63
Ponce Bank New York City, NY 31189 247,082.22
Popular Bank New York, NY 34967 247,768.63
Quad City Bank and Trust Company Bettendorf, IA 33867 27.49 S&T Bank Indiana, PA 11124 247,234.79
SMBC MANUBANK Los Angeles, CA 18618 247,768.63
Salem Five Cents Savings Bank Salem, MA 23296 247,768.63 Security First Bank Rapid City, SD 5415 247,082.22
Simmons Bank Pine Bluff, AR 3890 247,768.57
SmartBank Knoxville, TN 58463 247,768.63
Sound Community Bank Seattle, WA 57451 247,768.61
Date
02/28/2026 Page
4 of 5
CONTAINS CONFIDENTIAL INFORMATION IntraFi and ICS are registered service marks, and IntraFi Cash Service is a service mark, of IntraFi Network LLC. !NvHV!X#Pm/Y#E)[A+
LM
BND0={0ovT^8hV
0^P3
Z.h
e
CEz
3+
q1QqQQqQ1qqQQQ1Q
DETAILED ACCOUNT OVERVIEW
Account ID: *********354
Account Title: CITY OF PICO RIVERA
Summary of Balances as of February 28, 2026
FDIC-Insured Institution City/State FDIC Cert No. Balance South State Bank, N.A. Winter Haven, FL 33555 247,768.63 Stearns Bank N.A. St. Cloud, MN 10988 247,082.22
Summit Bank Eugene, OR 57706 247,768.63
Sunwest Bank Irvine, CA 20164 491.36
T Bank, National Association Dallas, TX 57703 161,858.69 Texas Security Bank Dallas, TX 58739 247,359.86
The Bank of Tampa Tampa, FL 21031 247,768.57
The Central Trust Bank Jefferson City, MO 12633 247,768.57 The Farmers & Merchants Bank Berlin, WI 15779 27.51
The Huntington National Bank Columbus, OH 6560 247,768.63 The Park Bank Madison, WI 19608 567.91
The State Bank and Trust Company Defiance, OH 13339 247,768.57 The Washington Trust Company of Westerly Westerly, RI 23623 247,768.57 Third Coast Bank Humble, TX 58716 247,768.63
TowneBank Portsmouth, VA 35095 247,768.64
TriState Capital Bank Pittsburgh, PA 58457 247,768.63
Truist Bank Charlotte, NC 9846 247,719.27
Two Rivers Bank & Trust Burlington, IA 58013 247,768.57 U.S. Bank National Association Cincinnati, OH 6548 247,768.63 UMB Bank, National Association Kansas City, MO 8273 247,768.57 Union Bank & Trust Lincoln, NE 13421 247,741.05
United Bank Fairfax, VA 22858 247,768.63
United Fidelity Bank, fsb Evansville, IN 29566 247,768.63 Valley National Bank Morristown, NJ 9396 247,768.63
Virginia National Bank Charlottesville, VA 34755 247,768.57 Waterford Bank, N.A. Toledo, OH 58433 247,082.22
West Bank West Des Moines, IA 15614 247,768.63
West Coast Community Bank Watsonville, CA 57591 247,768.63 West Michigan Community Bank Hudsonville, MI 22308 247,768.63 West Texas National Bank Midland, TX 22957 247,768.55
Western Alliance Bank Phoenix, AZ 57512 247,768.63
Zions Bancorporation, N. A. Salt Lake City, UT 2270 247,768.63 Date
02/28/2026 Page
5 of 5
CONTAINS CONFIDENTIAL INFORMATION IntraFi and ICS are registered service marks, and IntraFi Cash Service is a service mark, of IntraFi Network LLC. 66423
To: Mayor and City Council
From: City Manager
Meeting Date: March 24, 2026
Subject: PROCUREMENT OF TWO ELECTRIC VEHICLES AND ONE
ELECTRIC GREENS MOWER FOR THE PUBLIC WORKS
DEPARTMENT
Recommendation:
1. Authorize the purchase of two (2) 2026 Chevrolet Silverado fully Electric Vehicles (EV) in the amount of $156,000 and (1) Jacobsen Eclipse Elite 360 Lithium Electric Greens Mower in the amount of $82,000;
2. Appropriate $238,000 in Air Quality Funds (Fund 200) to Account No. 200.40.4033-57310 for the vehicles and mower purchases;
3. Authorize the City Manager, or his designee, to execute all agreements necessary to facilitate the purchase of two (2) 2026 Chevrolet Silverado EV’s and one (1) Jacobsen Eclipse Elite 360 Lithium Electric Greens Mower; and
4. Authorize the City Manager, or his designee, to execute all agreements necessary to facilitate the sale or disposal of Vehicles Unit Nos. 131 and 201.
Strategic Priority:
4 - Health, Wellness & Safety - Create a safe and thriving City with low crime and high standards for health and wellness.
Strategy:
4.3 Maintain a clean, safe, attractive environment to sustain a high quality of life for residents.
Fiscal Impact:
Amend the fiscal year (FY) 2025-26 Adopted Budget by appropriating $238,000 from the Air Quality Fund (Fund 200) unassigned fund balance to Account No. 200.40.4033-57310 (Vehicle Purchases) to pay for the purchase of two (2) 2026 Chevrolet Silverado electric vehicles and (1) Lithium Electric Greens Mower, for the Public Works Department. There is no fiscal impact to the General Fund.
11 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
PROCUREMENT OF TWO ELECTRIC VEHICLES AND ONE JACOBSEN ECLIPSE ELITE 360 LITHIUM ELECTRIC GREENS MOWER FOR THE PUBLIC WORKS
DEPARTMENT
Discussion:
The City’s replacement standards generally specify that a vehicle should be over 10 years old or have accumulated 100,000 miles to qualify for replacement. Vehicle Unit No. 131, a 2019 Chevy Colorado, has accumulated excessive service hours, required frequent and extensive repairs, and consumed a substantial amount of fuel despite having 76,500 miles.
Vehicle Unit No. 201, a 2014 Ford F-250, has experienced heavy service hours due to daily operational demands, which have resulted in mechanical strain, with frequent breakdowns and a reduced service lifespan. Vehicle Unit No. 201, almost 12 years old and 87,000 miles, requires frequent repairs and exhibits excessive fuel consumption.
Replacing Vehicle Unit Nos. 131 and 201 with two (2) new electric vehicles is projected to reduce operational costs, eliminate fuel consumption, enhance reliability, and support the City’s sustainability objectives.
The Parks Division presently utilizes five (5) gasoline-powered walk-behind reel mowers to maintain the infields of the City’s baseball fields. These units are over six (6) years old, require extensive repairs, and have been phased out due to new regulations governing small-engine emissions. The acquisition of a fully electric lithium-powered greens mower, to replace the 5 gas mowers, will enable Parks Maintenance staff to sustain efficient and reliable field maintenance equipment. Besides improving operational efficiency, the electric mower will decrease maintenance expenses, minimize downtime, and contribute to the City’s environmental sustainability efforts by removing gasoline dependency and reducing emissions.
The following table outlines the vehicle unit number, year, make, model, current mileage, proposed replacement, and the quoted purchase price.
Vehicle
Unit No.
Yr./ Make /Model Mileage Replacement
Model
Replacement
Quote
131 2019 Chevy Colorado 76,500
2026 Chevrolet
Silverado EV $78,000
201 2014 Ford F-250 87,000
2026 Chevrolet
Silverado EV $78,000
(5) Walk- behind reel
gasoline mowers
Jacobsen Eclipse
Elite 360 Lithium
Electric Mower $82,000
TOTAL: $238,000
The recommended purchase of the (2) Chevrolet Silverado EV’s and (1) Jacobsen Eclipse Elite 360 Lithium Electric Mower will utilize a cooperative purchasing contract authorized by Section 3.20.030 of the Pico Rivera Municipal Code. Utilizing State contract #1-22-23-20D, and Sourcewell contract number 112624-JCS. Cooperative agreements meet the requirements of Section 3.20.030 of the Pico Rivera Municipal Code and allow CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
PROCUREMENT OF TWO ELECTRIC VEHICLES AND ONE JACOBSEN ECLIPSE ELITE 360 LITHIUM ELECTRIC GREENS MOWER FOR THE PUBLIC WORKS
DEPARTMENT
staff to secure the most appropriate vehicle and equipment. Purchasing through vetted cooperative agreements assures that the procurement of goods and services complies with public purchasing regulations, is competitively solicited, and the City receives the most advantageous pricing while expediting the procurement.
Since 1991, local cities have received AB 2766 Subvention Funds to implement programs to reduce air pollution from motor vehicles. The Department of Motor Vehicles collects a Motor Vehicle Registration fee surcharge of $6 per vehicle that the local South Coast Air Quality Management District (AQMD) disburses to regional cities. The City receives approximately $75,000 annually in AQMD funds. These funds are available for various programs, including the purchase and lease of alternative-fuel and zero-emission fleet vehicles and equipment.
Abiding by the AQMD mandate to reduce air pollution, staff have researched various makes and models of passenger zero-emission vehicles for their functionality and overall value. The 2026 Chevy Silverado EV and the Jacobsen Eclipse Elite 360 Lithium Electric Greens Mower were selected for their functionality and compatibility with operational needs.
The aged vehicles being replaced are recommended for disposal by auction to recover any residual value. The Pico Rivera Municipal Code Section 3.20.100 allows the City to sell aged and inoperable vehicles through professional auctioneers. Utilizing an auction process enables the City to secure the highest possible price for the vehicle. It is therefore recommended that the City Council authorize the City Manager to proceed with the sale of the surplus vehicles at an auction to achieve efficiency and maximize resale value.
Conclusion:
Staff recommend that the City Council authorize the purchase of two (2) 2026 Chevy Silverado fully Electric Vehicles and one (1) Jacobsen Eclipse Elite 360 Lithium Electric Greens Mower in the amount not to exceed $238,000, authorize the appropriation from FY 2025-26 Air Quality Funds (Fund 200) unassigned fund balance for this expense, and authorize the City Manager, or his designee, to execute all related documents for the purchase of the vehicles and equipment. Additionally, authorize the City Manager, or his designee, to execute any agreements necessary to facilitate the sale or disposal of aged vehicles and equipment.
Steve Carmona
SC:NN:ML:np
To: Mayor and City Council
From: City Manager
Meeting Date: March 24, 2026
Subject: ADDITIONAL $44,500 APPROPRIATION FOR ENTERTAINMENT SERVICES AND SUPPLIES – PARKS AND RECREATION
SPECIAL EVENTS EFFORTS
Recommendation:
1. Approve an additional appropriation of $44,500 from the Community Benefit Fund to fund the entertainment and supplies contracts related to the World Cup 2026 Games.
Strategic Priority:
1 - Fiscal & Organizational Sustainability - Create a City government built to adapt to change.
Strategy:
5.1 Increase community participation and inclusion to cultivate a powerful sense of community pride and public awareness.
Fiscal Impact:
The Community Benefit Fund includes $83,500 towards this cost. However, an additional $44,500 is needed to cover the upfront costs to secure any entertainment and supplies contracts (Account No. 181.80.8102-54500) for the Friday, June 26th event. While the total cost of the World Cup 2026 Celebration Hub is not finalized, staff will return to City Council for additional appropriations once those costs are known.
Background:
The City of Pico Rivera (City) has been selected as a 2026 FIFA World Cup Celebration Hub, hosting a multi-day festival on June 26th and 27th. The event will connect several major community corridors and feature the following:
• Soccer tournaments, exhibitions, and youth clinics
• Multiple entertainment stages and jumbo-screen watch parties 12 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
ADDITIONAL $44,500 APPROPRIATION FOR ENTERTAINMENT SERVICES AND SUPPLIES – PARKS AND RECREATION SPECIAL EVENTS EFFORTS
• Cultural and artistic installations
• Local business activation
• Family-friendly activities, immersive experiences, and kids’ zones As the Celebration Hub designation brings regional visibility, foot traffic, and expanded community programming, ensuring high-quality entertainment, sound production, and staging infrastructure is essential to meeting event expectations and accommodating anticipated attendance.
Discussion:
The City’s Parks and Recreation Department has entered the planning and pre-negotiation phase for securing entertainment and a primary performance stage for the two-day festival. Entertainment booking and staging contracts require early commitments to secure availability and pricing. Although grant funding supports core operations of the Open Streets component, grant resources do not cover full entertainment production or staging costs, including:
• Performance stage rental and installation
• Lighting, audio, and technical services
• Performer fees and rider requirements
• Safety and crowd-control equipment related to stage operations • Event production staffing and logistics
To maintain commitments to a high-quality regional showcase and to avoid delay in contracting, a supplemental allocation is needed. The Parks and Recreation Department must begin securing contracts for the June 26th Celebration Zone at Smith Park. Below is an itemized list of the upfront costs that require early payment prior to the games.
Expenditure Estimated Cost
Professional Sound/Stage/Lighting Services $ 20,000
Entertainment - Bands & DJ's 40,000
Professional Decorating Services - Balloons, Draping, etc. 8,000 Portable Restrooms 14,000
Fencing 20,000
Light Towers/Generators/Pig Tails 14,000
Stage & Event Banners, Posters, etc. 5,000
Permits - Encroachment, Health, ABC 7,000
Initial Up-Front Costs to Secure Entertainment and Supplies $ 128,000 Funded: $ 83,500
Unfunded: $ 44,500
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
ADDITIONAL $44,500 APPROPRIATION FOR ENTERTAINMENT SERVICES AND SUPPLIES – PARKS AND RECREATION SPECIAL EVENTS EFFORTS
Conclusion:
Staff recommends City Council approve an additional appropriation of $44,500 from the Community Benefit Fund to fund the entertainment and supplies contracts related to the June 26th World Cup 2026 Games Celebration at Smith Park. The requested funding would enable the City to finalize negotiations and secure entertainment assets early, ensuring adequate lead time to meet procurement requirements and production schedules.
Steve Carmona
SC:AG:PY:cso
Tuesday, July 8, 2025
A Regular Meeting of the Housing Assistance Agency was held in the Council Chamber, Pico Rivera City Hall, 6615 Passons Boulevard, Pico Rivera, California.
Meeting was jointly held with the City Council, Successor Agency to the Pico Rivera Dissolved Redevelopment Agency, Housing Assistance Agency and Water Authority.
Items appear as listed on the combined agenda for the meeting of July 8, 2025.
Chairman Garcia called the regular meeting to order at 6:02 p.m. on behalf of the Housing Assistance Agency.
PRESENT: Camacho, Lara, Lutz , Sanchez, Garcia
ABSENT: None
PUBLIC COMMENTS: None
CONSENT CALENDAR ITEMS:
13. Minutes:
• Received and filed Housing Assistance Agency regular meeting of March 25, 2025
14. Section 8 Management Assessment Program Certification for Fiscal Year 2024-2025. (1600)
1. Approved Resolution No. HA-111 approving the submission of the Section 8 Management Assessment Program Certification for fiscal year 2024- 2025 to the U.S. Department of Housing and Urban Development.
Resolution No. HA-111 A RESOLUTION OF THE HOUSING
ASSISTANCE AGENCY OF THE CITY OF PICO RIVERA, CALIFORNIA, APPROVING THE SUBMISSION OF THE SECTION 8 MANAGEMENT
ASSESSMENT PROGRAM CERTIFICATION FOR FISCAL YEAR 2024-
2025 TO THE U.S. DEPARTMENT OF HOUSING AND URBAN
DEVELOPMENT
Motion by Vice Chairman Camacho, seconded by Commissioner Dr. Sanchez to approve Consent Calendar Item Nos. 13 and 14. Motion carries by the following roll call vote:
AYES: Camacho, Lara, Lutz, Sanchez, Garcia
NOES: None
CONSENT CALENDAR ITEMS PULLED FOR FURTHER DISCUSSION: None 13 Back to Agenda Outline
7-8-25.Housing Assistance Agency Minutes
REGULAR AGENDA: None
CLOSED SESSION(S): None
ADJOURNMENT:
Chairman Garcia adjourned the Housing Assistance Agency meeting at 8:10 p.m.
There being no objection, it was so ordered.
AYES: Camacho, Lara, Lutz, Sanchez, Garcia
NOES: None
________________________________
Gustavo V. Camacho, Chairman
ATTEST:
________________________________
Cynthia Ayala, CMC, Agency Secretary
I hereby certify that the foregoing is a true and correct report of the proceedings of the Housing Assistance Agency dated July 8, 2025 and received and filed by the Housing Assistance Agency on March 24, 2026.
_______________________________
Cynthia Ayala, CMC, Agency Secretary
A Regular Meeting of the Water Authority was held in the Auditorium, Pico Rivera Senior Center, 9200 Mines Avenue, Pico Rivera, California.
Meeting was jointly held with the City Council and Water Authority. Items appear as listed on the combined agenda for the meeting of February 24, 2026.
Authority President Camacho called the meeting to order at 6:04 p.m.
PRESENT: Garcia, Lara, Sanchez, Camacho
ABSENT: Lutz
PUBLIC COMMENTS: None
CONSENT CALENDAR ITEMS:
Water Authority:
9. Minutes:
• Approved Water Authority regular meeting of January 13, 2026
10. Amendment No. 6 to Professional Services Agreement No. 23-71 with Tetra Tech, Inc. for the Water Main Replacement Project, CIP No. 50078. (500)
1. Approved Amendment No. 6 to Agreement No. 23-71 with Tetra Tech Inc. in the additional amount of $15,500, increasing the total not-to-exceed contract amount to $240,500, to provide additional technical services during construction of the Water Main Replacement Project (Project);
2. Authorized the Executive Director to execute the amendment in a form approved by the General Counsel; and
3. Authorized the Executive Director to process contract amendments, as needed, for an additional amount of $30,000, thereby revising the total contingency not-to-exceed amount to $75,000 for design and technical construction-support contingency.
Agreement No. 23-71-6
Motion by Commissioner Lara, seconded by Commissioner Garcia to approve Consent Calendar Item Nos. 9 and 10. Motion carries by the following roll call vote:
AYES: Garcia, Lara, Sanchez, Camacho
NOES: None
ABSENT: Lutz
CONSENT CALENDAR ITEMS PULLED FOR FURTHER DISCUSSION: None Tuesday, February 24, 2026
14 Back to Agenda Outline
2-24-26 Water Minutes
REGULAR AGENDA: None
ADJOURNMENT:
President Camacho adjourned the Water Authority meeting at 7:26 p.m. There being no objection it was so ordered.
AYES: Garcia, Lara, Sanchez, Camacho
NOES: None
ABSENT: Lutz
________________________________
Gustavo V. Camacho, President
ATTEST:
________________________________
Cynthia Ayala, CMC, Authority Secretary
I hereby certify that the foregoing is a true and correct report of the proceedings of the Water Authority regular meeting dated February 24, 2026, and approved by the Water Authority on March 24, 2026.
_______________________________
Cynthia Ayala, CMC, Authority Secretary
To: President and Commissioners
From: Executive Director
Meeting Date: March 24, 2026
Subject: VENDOR AGREEMENTS TO FERGUSON WATER WORKS AND
S & J SUPPLY COMPANY FOR GENERAL WATER INVENTORY
SUPPLIES
Recommendation:
1. Award a Vendor Agreement, in a form approved by the General Counsel, to Ferguson Waterworks, to provide the purchase and acquisition of general water inventory supplies Category A and Category C for an annual amount of up to $175,000 and a not-to-exceed total of $525,000 for a three (3) year term;
2. Award a Vendor Agreement, in a form approved by the General Counsel, to S & J Supply Co., to provide the purchase and acquisition of general water inventory supplies Category B for an annual amount of up to $150,000 and a not-to-exceed total of $450,000 for a three (3) year term; and
3. Authorize the Public Works Director to process change orders in an amount notto-exceed 10% of the total agreement amounts, up to a combined contract amount of $100,000 for emergency unforeseen contingencies.
Strategic Priority:
3 - Infrastructure - Plan, fund, build, and maintain reliable and cost-effective infrastructure that contributes to enhancing quality of life
Strategy:
3.4 Facilitate a high-level of maintenance of City infrastructure to reduce increased costs from prolonged deferral.
Fiscal Impact:
The City of Pico Rivera (City) anticipates expending no more than approximately $100,000 in fiscal year (FY) 2025–26 under these agreements. The (FY) 2025-26 15 Back to Agenda Outline
PICO RIVERA WATER AUTHORITY AGENDA REPORT – MEETING OF MARCH 24, 2026
VENDOR SERVICES AGREEMENT TO FERGUSON WATER WORKS AND S & J
SUPPLY COMPANY FOR GENERAL WATER INVENTORY SUPPLIES
Adopted Budget already includes funding of $100,000 in Account No. 550.40.4920-54100 (Special Departmental Expenses) for the purchase of water maintenance supplies, no additional appropriations are required at this time. Any remaining costs associated with the agreements will be incorporated into future budget cycles.
Discussion:
The Pico Rivera Water Authority (PRWA) oversees the daily operations of more than 90 miles of water distribution pipeline, 9,500 service connections, 5 active wells, 3 ion exchange treatment facilities, 3 booster pump stations, 3 reservoirs, and 875 fire hydrants. The PRWA is also responsible for distributing and treating water to its customers.
PRWA staff perform repairs and maintenance on the distribution and treatment of the water system by procuring necessary materials. Due to fluctuations in material costs and availability, the PRWA has had increased difficulty procuring the necessary equipment and materials for daily operations and repairs.
On January 7, 2026, the Request for Bids (RFB) for inventory supplies for the PRWA was published on PlanetBids through the City’s website portal. Six (6) bids were received through PlanetBids on February 19, 2026.
The RFB was organized into three (3) distinct categories: A, B, and C. Category A included components made from bronze and brass, such as various ductile piping, couplings, and valves. Category B encompassed gate and butterfly valves, clamps, and fire hydrants. Category C focused on gaskets, meter boxes and lids. Staff believed that segmenting the RFB into these categories would attract more vendors who specialize in specific materials, thereby encouraging a broader range of bids and reducing reliance on a single vendor's inventory at the time of material purchase.
The following table summarizes the bids received:
Category Vendor Total Bid
A Ferguson Waterworks $118,297
A Western Water Works Supply $119,391
A Core & Main $128,437
A S & J Supply Co. $132,071
A OC WinWater $248,281
PICO RIVERA WATER AUTHORITY AGENDA REPORT – MEETING OF MARCH 24, 2026
VENDOR SERVICES AGREEMENT TO FERGUSON WATER WORKS AND S & J
SUPPLY COMPANY FOR GENERAL WATER INVENTORY SUPPLIES
Category Vendor Total Bid
B S & J Supply Co. - $86,992
B Ferguson Waterworks $89,403
B Western Water Works Supply $92,328
B Core & Main $93,547
B OC WinWater $161,506
Category Vendor Total Bid
C Ferguson Waterworks $86,073
C Western Water Works Supply $121,087
C OC WinWater $218,113
C S & J Supply Co. Non-Responsive
C Core & Main Non-Responsive
Following a thorough review of the submitted proposals, staff identified Ferguson Waterworks as the lowest responsive and responsible bidder for Category A in the amount of $118,297; S & J Supply Co. as the lowest responsive and responsible bidder for Category B in the amount of $86,992; and Feguson Waterworks as the lowest responsive and responsible bidder for Category C in the amount of $86,073 Both S&J Supply Co. and Core & Main were deemed non-responsive in Category C as both did not provide unit price responses to all bid items listed in Category C.
Conclusion:
Staff recommend awarding Vendor Agreements for general water inventory supplies to Ferguson Waterworks and to S & J Supply Co. Staff also recommend authorizing the Public Works Director to approve change orders up to 10%, not to exceed a combined $100,000, for emergencies or unforeseen contingencies.
Steve Carmona
SC:NN:GE:AR:np
Enclosure(s): 1) Vendor Agreement- Ferguson Waterworks
2) Vendor Agreement - S & J Supply Co.
PICO RIVERA WATER AUTHORITY
VENDOR AGREEMENT
**************************************************************************************************** This “Agreement” is made on March 24, 2026, by and between the Pico Rivera Water Authority (“PRWA”) and S & J Supply Company, Inc. (“Vendor”) (collectively “Parties”).
The term of this Agreement (“Term”) shall commence on March 24, 2026 (“Effective Date”) and shall expire on March 24, 2029 (“Expiration Date”) unless extended in writing by an amendment to this Agreement executed by both Parties.
Vendor shall provide Services in a reasonable and professional manner customary to the standards of the industry. Vendor represents that they are trained and qualified to provide the services as required by this Agreement. All Services and all associated materials, equipment, products, or goods shall be performed or provided in compliance with all applicable all State, Federal and Local laws, ordinances, codes and regulations that in any manner affect the Services provided under this Agreement including but not limited to any necessary permits or regulatory approvals, and all non-discrimination and equal opportunity laws and regulations applicable to this Agreement. Vendor covenants and acknowledges that it does not now have nor shall it acquire any financial or business interest that would conflict with the performance of Services under this this Agreement, or which would conflict in any manner with the performance of its Services hereunder.
Services description: delivery of the materials and equipment specified in Vendor’s proposal, attached hereto as Exhibit B and incorporated herein by this reference (“Services”). In the event of any conflict between Vendor’s proposal and this Agreement, the provisions of this Agreement shall control. Any changes to the Services provided herein shall not be valid unless memorialized in a written change order or amendment approved by all Parties.
Location: 9633 Beverly Rd, Pico Rivera CA 90660
Vendor shall deliver material on the following dates: ___Various___________________ Vendor shall arrive at the venue on the Delivery Date and be completely set up no later than the specified start time. Vendor shall remove the equipment and/or uniforms on the date and time specified above.
The Parties agree and understand that Vendor is not an employee of PRWA but shall be solely an independent contractor acting under the terms and conditions set forth herein.
Vendor reserves the right to determine the assignment of its own employees to the performance of this Agreement. Vendor shall have no power to incur any debt, obligation, or liability on behalf of PRWA or otherwise to act on behalf of PRWA as an agent. Neither PRWA nor any of its officers, employees or agents shall have control over the conduct of Vendor or any of Vendor’s employees, except as set forth in this Agreement. Vendor shall not at any time represent that it is, or that any of its agents or employees are, in any Enclosure 1
15a
Back to Agenda Outline
Vendor Agreement
S & J SUPPLY COMPANY, INC.
manner, employees of PRWA. Vendor shall be solely responsible for all federal and state income taxes and any other applicable taxes. Vendor shall not be an employee of PRWA for Workers Compensation or any other purposes and shall not receive Unemployment Insurance benefits, Social Security coverage or other employee benefits. Vendor understands and agrees that Vendor shall not be an employee of PRWA as defined in the California Labor Code. Vendor shall indemnify, defend, and hold harmless PRWA for the payment of any employee and/or employer contributions for PERS benefits on behalf of Vendor or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of PRWA.
All materials delivered by Vendor or provided by Vendor under this Agreement are deemed confidential and shall not be disclosed by Vendor without prior written consent by PRWA even after the expiration or termination of this Agreement. Vendor shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement.
PRWA shall have the right to access and examine inventory records, without charge, during normal business hours.
PRWA agrees to pay Vendor an amount not to exceed Four Hundred Fifty Thousand Dollars ($450,000.00) in accordance with the unit prices indicated on Exhibit B for the term of the agreement. Prior to each anniversary of the Effective Date of this Agreement, the unit prices included in Exhibit B shall increase by an amount equal to the percent change in the Consumer Price Index for Los Angeles, Riverside-Orange County, as compared to the prior year. In no event shall any annual increase to the unit prices based on CPI exceed three percent (3%). Vendor shall not be entitled to any additional reimbursement or payment from PRWA. Any corresponding increase or decrease in compensation associated with a change in the amount or level of Services, shall be incorporated by written amendment to this Agreement executed by all Parties.
PRWA may terminate this Agreement at any time, with or without cause, by giving five (5) days prior written notice of such termination to Vendor, and by specifying the effective date thereof. If this Agreement is terminated by PRWA as provided herein, Vendor shall be paid for its services satisfactorily rendered to PRWA as of the date of termination. In no event shall the amount paid by PRWA exceed the amount which would be paid Vendor for the full provision of services under this Agreement. Vendor shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without PRWA’s prior written consent, and any attempt to do so shall be void and of no effect.
Vendor shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement. Vendor shall defend, indemnify, and hold harmless the PRWA, its officials, and every officer, employee and agent of PRWA (collectively “Indemnitees”) from any claim, liability or financial loss (including, without limitation, attorneys’ fees and costs), injuries to property or persons (including without limitation, attorneys’ fees and costs) arising out of any acts or omissions of Vendor, its officials, officers, employees or agents in connection with the performance of this Agreement, Vendor Agreement
S & J SUPPLY COMPANY, INC.
except for such claim, liability or financial loss or damage arising from the sole negligence or willful misconduct of the Indemnitees, as determined by judicial decision or by the agreement of the Parties. Vendor shall defend Indemnitees, with counsel of PRWA’s choice, at Vendor’s own cost, expense, and risk, and shall pay and satisfy any judgment, award, or decree that may be rendered against the Indemnitees. Vendor shall reimburse Indemnitees for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Vendor’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Vendor or Indemnitees. No official or employee of the PRWA shall be personally liable to Vendor in the event of any default or breach by Indemnitees, or for any amount which may become due to Vendor. All duties of Vendor under this Section shall survive termination of this Agreement.
Vendor warrants and represents that the individual executing this Agreement below has the full right and authority to enter into this Agreement, and authority to fully commit and bind Vendor to the provisions of this Agreement. The waiver by PRWA or Vendor of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. If a court of competent jurisdiction holds any provision of this Agreement to be illegal, invalid or unenforceable for any reason, the validity of and enforceability of the remaining provisions of this Agreement shall not be affected and continue in full force and effect.
If a Party commences any legal, administrative, or other action against the other Party arising out of or in connection with this Agreement, the prevailing Party in such action shall be entitled to have and recover from the losing Party all of its attorneys’ fees and other costs incurred in connection therewith, in addition to such other relief as may be sought and awarded.
This Agreement represents the entire integrated agreement between PRWA and Vendor, and supersedes all prior negotiations, representations, or agreements, either written or oral. This Agreement may be amended only by a written instrument signed by both PRWA and Vendor. This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement.
The interpretation and implementation of this Agreement shall be governed by the domestic law of the State of California. Any litigation concerning this Agreement shall take place in the superior or federal district court with geographic jurisdiction over the City of Pico Rivera.
Vendor Agreement
S & J SUPPLY COMPANY, INC.
Vendor’s address for notices under this Agreement:
Robert Smith, Outside Sales
S&J Supply Company, Inc.
13105 Florence Ave.
Santa Fe Springs, CA, 90670
EXHIBIT A (ADDITIONAL TERMS AND CONDITIONS) AND B (VENDOR’S
PROPOSAL) ARE ATTACHED HERETO IS INCORPORATED HEREIN BY THIS
REFERENCE
This writing constitutes the entire Agreement between PRWA and Vendor and may be amended only by written mutual agreement. THIS CONTRACT MUST BE SIGNED AND RETURNED TO THE PRWA’S PUBLIC WORKS DEPARTMENT OFFICE PRIOR TO THE START OF THE CONTRACT SERVICE. PAYMENT MAY BE WITHHELD FOR ANY SERVICES PERFORMED PRIOR TO THE EXECUTION OF THIS CONTRACT. “PRWA” “VENDOR”
PICO RIVERA WATER AUTHORITY S & J SUPPLY COMPANY, INC.
_____________________________
Steve Carmona, Executive Director
Dated: ________________________
ATTEST:
___________________________
Cynthia Ayala, Authority Secretary
___________________________________
Robert Smith, Outside Sales
Dated: _____________________________
APPROVED AS TO FORM:
___________________________________
Arnold M. Alvarez-Glasman, General Counsel
EXHIBIT A
ADDITIONAL TERMS AND CONDITIONS
Section 1. Insurance.
(a) Vendor shall at all times during the term of this Agreement carry, maintain, and keep in full force and effect, insurance as follows:
1. A policy or policies of Comprehensive General Liability Insurance, with minimum limits of One Million Dollars ($1,000,000) for each occurrence, combined single limit, against any personal injury, death, loss, or damage resulting from the wrongful or negligent acts by Vendor.
2. A policy or policies of Comprehensive Vehicle Liability Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by Vendor in performing the Services required by this Agreement.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease. (b) Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions:
1. City, its officials, officers, employees, designated volunteers and agents serving as independent contractors in the role of City officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Vendor; products and completed operations of Vendor; premises owned, occupied or used by Vendor; or automobiles owned, leased, hired or borrowed by Vendor.
The coverage shall contain no limitations on the scope of protection afforded to City, its officials, officers, employees, designated volunteers or agents serving as independent contractors in the role of City officials that are not also limitations applicable to the named insured.
2. For any claims related to this Agreement, Vendor’s insurance coverage shall be primary insurance as respects City, its officials, officers, employees, designated volunteers and agents serving as independent contractors in the role of City officials. Any insurance or self-insurance maintained by City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials shall be excess of Vendor’s insurance and shall not contribute with it.
3. Vendor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
4. Each insurance policy required by this Agreement shall expressly waive the insurer’s right of subrogation against City and its officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of City officials.
5. Each insurance policy required by this Agreement shall be endorsed to state: should the policy be canceled before the expiration date, the issuing insurer shall mail 30 days’ prior written notice to the City.
6. If insurance coverage is canceled or reduced in coverage or in limits, Vendor shall within two business days of notice from insurer, phone, fax and/or notify the City via certified mail, return receipt requested, of the changes to or cancellation of the policy.
(c) The City’s Risk Manager may, in writing, amend and/or waive any or all of the insurance provisions set forth herein. In such case, the Vendor shall comply with the insurance provisions required by the City’s Risk Manager. (d) The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A-;VII in the latest edition of Best’s Insurance Guide, unless waved in writing by City’s Risk Manager. (e) Vendor agrees that if it does not keep the aforesaid insurance in full force and effect, City may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, City may take out the necessary insurance and pay, at Vendor’s expense, the premium thereon.
(f) All insurance coverages shall be confirmed by execution of endorsements on forms approved by City. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before services commence. As an alternative to City forms, Vendor’s insurer may provide complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications. (g) Any deductibles or self-insured retentions must be declared to and approved by City, and shall not exceed Twenty Five Thousand Dollars ($25,000). (h) Vendor shall require each of its sub-contractors (if any) to maintain insurance coverage that meets all of the requirements of this Agreement.
EXHIBIT B
BID SCHEDULE
PICO RIVERA WATER AUTHORITY
VENDOR AGREEMENT
**************************************************************************************************** This “Agreement” is made on March 24, 2026, by and between the Pico Rivera Water Authority (“PRWA”) and Ferguson Enterprises, LLC dba Ferguson Waterworks (“Vendor”) (collectively “Parties”).
The term of this Agreement (“Term”) shall commence on March 24, 2026 (“Effective Date”) and shall expire on March 24, 2029(“Expiration Date”) unless extended in writing by an amendment to this Agreement executed by both Parties.
Vendor shall provide Services in a reasonable and professional manner customary to the standards of the industry. Vendor represents that they are trained and qualified to provide the services as required by this Agreement. All Services and all associated materials, equipment, products, or goods shall be performed or provided in compliance with all applicable all State, Federal and Local laws, ordinances, codes and regulations that in any manner affect the Services provided under this Agreement including but not limited to any necessary permits or regulatory approvals, and all non-discrimination and equal opportunity laws and regulations applicable to this Agreement. Vendor covenants and acknowledges that it does not now have nor shall it acquire any financial or business interest that would conflict with the performance of Services under this this Agreement, or which would conflict in any manner with the performance of its Services hereunder.
Services description: delivery of materials and equipment specified in Vendor’s proposal, attached hereto as Exhibit B and incorporated herein by this reference (“Services”). In the event of any conflict between Vendor’s proposal and this Agreement, the provisions of this Agreement shall control. Any changes to the Services provided herein shall not be valid unless memorialized in a written change order or amendment approved by all Parties.
Location: 9633 Beverly Rd, Pico Rivera CA 90660
Vendor shall deliver material on the following date: ___Various___________________ Vendor shall arrive at the venue on the Delivery Date and be completely set up no later than the specified start time. Vendor shall remove the equipment and/or uniforms on the date and time specified above.
The Parties agree and understand that Vendor is not an employee of PRWA but shall be solely an independent contractor acting under the terms and conditions set forth herein.
Vendor reserves the right to determine the assignment of its own employees to the performance of this Agreement. Vendor shall have no power to incur any debt, obligation, or liability on behalf of PRWA or otherwise to act on behalf of PRWA as an agent. Neither PRWA nor any of its officers, employees or agents shall have control over the conduct of Vendor or any of Vendor’s employees, except as set forth in this Agreement. Vendor shall not at any time represent that it is, or that any of its agents or employees are, in any Enclosure 2
15b
Back to Agenda Outline
Vendor Agreement
FERGUSON ENTERPRISES LLC, DBA FERGUSON WATERWORKS
manner employees of PRWA. Vendor shall be solely responsible for all federal and state income taxes and any other applicable taxes. Vendor shall not be an employee of PRWA for Workers Compensation or any other purposes and shall not receive Unemployment Insurance benefits, Social Security coverage or other employee benefits. Vendor understands and agrees that Vendor shall not be an employee of PRWA as defined in the California Labor Code. Vendor shall indemnify, defend, and hold harmless PRWA for the payment of any employee and/or employer contributions for PERS benefits on behalf of Vendor or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of PRWA.
All materials delivered by Vendor or provided by Vendor under this Agreement are deemed confidential and shall not be disclosed by Vendor without prior written consent by PRWA even after the expiration or termination of this Agreement. Vendor shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement.
PRWA shall have the right to access and examine such records, without charge, during normal business hours. PRWA shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.
PRWA agrees to pay Vendor an amount not to exceed Five Hundred Twenty Five Thousand Dollars ($525,000.00) in accordance with the unit prices indicated on Exhibit B. Prior to each anniversary of the Effective Date of this Agreement, the unit prices included in Exhibit B shall increase by an amount equal to the percent change in the Consumer Price Index for Los Angeles, Riverside-Orange County, as compared to the prior year. In no event shall any annual increase to the unit prices based on CPI exceed three percent (3%). Vendor shall not be entitled to any additional reimbursement or payment from PRWA. Any corresponding increase or decrease in compensation associated with a change in the amount or level of Services, shall be incorporated by written amendment to this Agreement executed by all Parties.
PRWA may terminate this Agreement at any time, with or without cause, by giving five (5) days prior written notice of such termination to Vendor, and by specifying the effective date thereof. If this Agreement is terminated by PRWA as provided herein, Vendor shall be paid for its services satisfactorily rendered to PRWA as of the date of termination. In no event shall the amount paid by PRWA exceed the amount which would be paid Vendor for the full provision of services under this Agreement. Vendor shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without PRWA’s prior written consent, and any attempt to do so shall be void and of no effect.
Vendor shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement. Vendor shall defend, indemnify, and hold harmless the PRWA, its officials, and every officer, employee and agent of PRWA (collectively “Indemnitees”) from any claim, liability or financial loss (including, without limitation, Vendor Agreement
FERGUSON ENTERPRISES LLC, DBA FERGUSON WATERWORKS
attorneys’ fees and costs), injuries to property or persons (including without limitation, attorneys’ fees and costs) arising out of any acts or omissions of Vendor, its officials, officers, employees or agents in connection with the performance of this Agreement, except for such claim, liability or financial loss or damage arising from the sole negligence or willful misconduct of the Indemnitees, as determined by judicial decision or by the agreement of the Parties. Vendor shall defend Indemnitees, with counsel of PRWA’s choice, at Vendor’s own cost, expense, and risk, and shall pay and satisfy any judgment, award, or decree that may be rendered against the Indemnitees. Vendor shall reimburse Indemnitees for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Vendor’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Vendor or Indemnitees. No official or employee of the PRWA shall be personally liable to Vendor in the event of any default or breach by Indemnitees, or for any amount which may become due to Vendor. All duties of Vendor under this Section shall survive termination of this Agreement.
Vendor warrants and represents that the individual executing this Agreement below has the full right and authority to enter into this Agreement, and authority to fully commit and bind Vendor to the provisions of this Agreement. The waiver by PRWA or Vendor of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. If a court of competent jurisdiction holds any provision of this Agreement to be illegal, invalid or unenforceable for any reason, the validity of and enforceability of the remaining provisions of this Agreement shall not be affected and continue in full force and effect.
If a Party commences any legal, administrative, or other action against the other Party arising out of or in connection with this Agreement, the prevailing Party in such action shall be entitled to have and recover from the losing Party all of its attorneys’ fees and other costs incurred in connection therewith, in addition to such other relief as may be sought and awarded.
This Agreement represents the entire integrated agreement between PRWA and Vendor, and supersedes all prior negotiations, representations, or agreements, either written or oral. This Agreement may be amended only by a written instrument signed by both PRWA and Vendor. This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement.
The interpretation and implementation of this Agreement shall be governed by the domestic law of the State of California. Any litigation concerning this Agreement shall take place in the superior or federal district court with geographic jurisdiction over the City of Pico Rivera.
Vendor’s address for notices under this Agreement:
Vendor Agreement
FERGUSON ENTERPRISES LLC, DBA FERGUSON WATERWORKS
Matt Wilkinson, Municipal Sales Manager
Ferguson Enterprises LLC, dba Ferguson Waterworks
2600 Marine Ave.
Redondo Beach, CA, 90278
EXHIBIT A (ADDITIONAL TERMS AND CONDITIONS) AND B (VENDOR’S
PROPOSAL) ARE ATTACHED HERETO IS INCORPORATED HEREIN BY THIS
REFERENCE
This writing constitutes the entire Agreement between PRWA and Vendor and may be amended only by written mutual agreement. THIS CONTRACT MUST BE SIGNED AND RETURNED TO THE PRWA’S PUBLIC WORKS DEPARTMENT OFFICE PRIOR TO THE START OF THE CONTRACT SERVICE. PAYMENT MAY BE WITHHELD FOR ANY SERVICES PERFORMED PRIOR TO THE EXECUTION OF THIS CONTRACT. “PRWA”
PICO RIVERA WATER AUTHORITY
_____________________________
Steve Carmona, Executive Director
Dated: ________________________
ATTEST:
___________________________
Cynthia Ayala, Authority Secretary
“VENDOR”
FERGUSON ENTERPRISES LLC, DBA
FERGUSON WATERWORKS
___________________________________
Matt Wilkinson, Municipal Sales Manager
Dated: _____________________________
APPROVED AS TO FORM:
___________________________________
Arnold M. Alvarez-Glasman, General Counsel
EXHIBIT A
ADDITIONAL TERMS AND CONDITIONS
Section 1. Insurance.
(a) Vendor shall at all times during the term of this Agreement carry, maintain, and keep in full force and effect, insurance as follows:
1. A policy or policies of Comprehensive General Liability Insurance, with minimum limits of One Million Dollars ($1,000,000) for each occurrence, combined single limit, against any personal injury, death, loss, or damage resulting from the wrongful or negligent acts by Vendor.
2. A policy or policies of Comprehensive Vehicle Liability Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by Vendor in performing the Services required by this Agreement.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease. (b) Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions:
1. City, its officials, officers, employees, designated volunteers and agents serving as independent contractors in the role of City officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Vendor; products and completed operations of Vendor; premises owned, occupied or used by Vendor; or automobiles owned, leased, hired or borrowed by Vendor.
The coverage shall contain no limitations on the scope of protection afforded to City, its officials, officers, employees, designated volunteers or agents serving as independent contractors in the role of City officials that are not also limitations applicable to the named insured.
2. For any claims related to this Agreement, Vendor’s insurance coverage shall be primary insurance as respects City, its officials, officers, employees, designated volunteers and agents serving as independent contractors in the role of City officials. Any insurance or self-insurance maintained by City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials shall be excess of Vendor’s insurance and shall not contribute with it.
3. Vendor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
4. Each insurance policy required by this Agreement shall expressly waive the insurer’s right of subrogation against City and its officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of City officials.
5. Each insurance policy required by this Agreement shall be endorsed to state: should the policy be canceled before the expiration date, the issuing insurer shall mail 30 days’ prior written notice to the City.
6. If insurance coverage is canceled or reduced in coverage or in limits, Vendor shall within two business days of notice from insurer, phone, fax and/or notify the City via certified mail, return receipt requested, of the changes to or cancellation of the policy.
(c) The City’s Risk Manager may, in writing, amend and/or waive any or all of the insurance provisions set forth herein. In such case, the Vendor shall comply with the insurance provisions required by the City’s Risk Manager. (d) The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A-;VII in the latest edition of Best’s Insurance Guide, unless waved in writing by City’s Risk Manager. (e) Vendor agrees that if it does not keep the aforesaid insurance in full force and effect, City may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, City may take out the necessary insurance and pay, at Vendor’s expense, the premium thereon.
(f) All insurance coverages shall be confirmed by execution of endorsements on forms approved by City. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before services commence. As an alternative to City forms, Vendor’s insurer may provide complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications. (g) Any deductibles or self-insured retentions must be declared to and approved by City, and shall not exceed Twenty-Five Thousand Dollars ($25,000). (h) Vendor shall require each of its sub-contractors (if any) to maintain insurance coverage that meets all of the requirements of this Agreement.
EXHIBIT B
BID SCHEDULE
To: Mayor and City Council
From: City Manager
Meeting Date: March 24, 2026
Subject: PURPLE HEART MONUMENT FINAL DESIGN – VETERANS
MEMORIAL PLAZA
Recommendation:
1. Approve the design and inscription of the Purple Heart Monument to be installed at the Veterans Memorial Plaza.
Strategic Priority:
5 - Community Engagement - Foster a connected, collaborative, and actively participating City and workforce.
Strategy:
5.1 Increase community participation and inclusion to cultivate a powerful sense of community pride and public awareness.
Fiscal Impact:
Sufficient funding is included in the fiscal year (FY) 2025–26 Budget within the General Fund (Account No. 100.80.8220-54400) to support this project. There is an available balance of approximately $9,291 remaining for the Purple Heart Monument Project. No additional appropriations are required at this time.
Background:
On February 13, 2024, the City Council approved a resolution designating the City of Pico Rivera as a Purple Heart City, joining the ranks of other California cities in recognizing and honoring recipients of the Purple Heart. With this designation, Pico Rivera became the 107th Purple Heart City in the State.
On March 25, 2025, the City Council approved a budget allocation of $20,000 for the purchase and installation of a Purple Heart Monument. The monument is intended to honor members of the community who were wounded or killed in combat while serving in 16 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 24, 2026
PURPLE HEART MONUMENT FINAL DESIGN – VETERANS MEMORIAL PLAZA
the United States Armed Forces in defense of the nation’s freedoms which are enjoyed by all Americans.
Veterans Memorial Plaza was selected as the site for the monument, as its design complements the Plaza’s existing features and integrates seamlessly with the surrounding environment. The monument will include a granite base measuring 48 inches wide, 8 inches high, and 12 inches deep, consistent with the existing plaza pillars. The monument itself will measure 44 inches wide, 40 inches high, and 8 inches deep. The design will feature engraved memorial text along with a full-color replica of the Purple Heart Medal.
Over the past year, staff awaited delivery of a custom granite slab sourced overseas to ensure consistency with the existing monuments at Veterans Memorial Plaza. Due to the need to match the exact color and material, the slab was procured from India and transported by sea, resulting in an extended delivery timeline.
Discussion:
In January 2026, the granite slab arrived at the Port of Long Beach. Soon after, staff inspected and approved the granite slab for etching. Staff subsequently developed design concepts and presented two options to the Veterans Commission for consideration. On March 18, 2026, the Veterans Commission unanimously approved Design A (Enclosure 1) in a 5-0 vote and recommended it for City Council approval.
The City takes great pride in the many military veterans who call Pico Rivera home. The proposed Purple Heart Monument will serve as a meaningful tribute to recognize and honor residents who were wounded or lost their lives while serving their country. The installation of the monument will enhance the Veterans Memorial Plaza by adding historical significance and creating a space for reflection, remembrance, and community education.
Conclusion:
Staff recommends that the City Council approve the design and inscription to ensure the granite monument is completed and ready for unveiling in conjunction with Memorial Day 2026.
Steve Carmona
SC:PY:cr
Enclosure: 1) Purple Heart Monument Design A
Enclosure 1
16a
COUNCIL
MEETING
DATE
COUNCIL MEMBER REQUEST DETAIL DIRECTOR(S)
ACTION TAKEN: Memo; Staff
Report; Closed Session;
Presentation; Follow-up
Meeting; City Manager Reports;
Informal Action
DISCUSSION
ITEM
ACTION
ITEM DATE
STATUS:
Complete;
Pending;
On-going;
In-Progress
9/9/2025 Sanchez/Garcia Smoke Free Multi-Unit Housing Year of 2026 Alvie Betancourt CED/Planning Commission Agenda Report In Progress 11/12/2025 Sanchez/Camacho SNAP Benefits Assistance to residents 2/24/2026 Garcia/Sanchez Pico Boys Softball Team Relocation Pam Yugar
GOOD OF THE ORDER