Project Origin : Priority Score : 59
Budget
New X Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 500,000.00 $ 3,550,000 $ - $ - $ - $ 4,050,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 30,000 $ 30,000
$ 420,000 $ 420,000
$ 3,370,000 $ 3,370,000
$ 50,000 $ 180,000 $ 230,000
$ 500,000 $ 3,550,000 $ - $ - $ - $ 4,050,000
$ 500,000 $ 3,550,000 $ - $ - $ 4,050,000
$ 500,000 $ 3,550,000 $ - $ - $ - $ 4,050,000
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Tennent-1 improvements as identified in the Sanitary Sewer Collection System Master Plan. This project includes the replacement of approximately 130 feet of 24-inch diameter pipeline, 1,250 feet of 30-inch diameter pipeline, and 10 feet of 36-inch diameter pipeline along Tennent Avenue and inside of the Water Pollution Control Plant (WPCP) with 1,390 feet of 36-inch to 42-inch diameter pipeline.

History, Status, or Impact if Delayed
The Sanitary Sewer Collection System Master plan identified capacity deficiencies which result in surcharging of the gravity sewer and cause sanitary sewer overflows (SSO's) during modeled peak wet weather flow (PWWF) conditions.

General Plan Goals/Policies

TOTAL FUNDS

TOTAL USES
Planning
Design
Construction
Contingency

SOURCE(S)
SS2405 - LOWER TENNENT TRUNK SEWER CAPACITY
Master Plan
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget
USE(S)
Goal CS.6, Policy CS.6.1; Goal GM.4, Policy GM.4.1
Estimated
Expenditures
to-date
Project Start 7/1/2026 Estimated Completion
Description

Page 331 of 374 ends

Project Origin : Priority Score : 57
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ 660,000 $ - $ - $ - $ 660,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 600,000 $ 600,000
$ 60,000 $ 60,000
$ - $ 660,000 $ - $ - $ - $ 660,000
$ 660,000 $ 660,000
$ - $ 660,000 $ - $ - $ - $ 660,000
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Estimated
Expenditures
to-date
Project Start 7/1/2027 Estimated Completion
Design
Construction
Contingency
Description
This project will replace the anaerobic digester process boilers at the Wastewater Treatment Plant.

History, Status, or Impact if Delayed
The anaerobic digestion process at the WPCP includes hot water boilers to heat water for use in the digester sludge heat exchanger. Two 40 HP Natural Gas Scotch Boilers, manufactured by Hurst Boiler & Welding Co., Inc. were installed in 2006 during the Anaerobic Digester Improvements project.

General Plan Goals/Policies
SS2404 - WPCP BOILER REPLACEMENT
End of Life Cycle

TOTAL FUNDS

SOURCE(S)
500 - Sewer Enterprise Fund
Goal CS.1, Goal CS.6, Policy CS.6.1

TOTAL USES
Summary of Capital Cost
Projected Budget
USE(S)
Planning

Page 332 of 374 ends

Project Origin : Priority Score : 57
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ - $ 990,000 $ - $ - $ 990,000
6/30/2029
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 900,000 $ 900,000
$ 90,000 $ 90,000
$ - $ - $ 990,000 $ - $ - $ 990,000
$ 990,000 $ 990,000
$ - $ - $ 990,000 $ - $ - $ 990,000
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction
Contingency
Goal CS.1, Goal CS.6, Policy CS.6.1
Estimated
Expenditures
to-date
Project Start 7/1/2028 Estimated Completion
Description
This project will replace the dewatering centrifuge at the Wastewater Treatment Plant.

History, Status, or Impact if Delayed
The solids handling process at the WPCP includes solids dewatering using centrifuges. One of two centrifuges at the WPCP was originally installed in 2006 and reused and relocated to the Solids Handling Building during the plant upgrades completed in 2019. The centrifuge is an Alfa Laval, Aldec G2-95 unit.

General Plan Goals/Policies
SS2403 - WPCP CENTRIFUGE REPLACEMENT
End of Life Cycle

TOTAL FUNDS

TOTAL USES

SOURCE(S)
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Design

Page 333 of 374 ends

Project Origin : Priority Score : 59
Budget
New X Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 1,000,000.00 $ 1,960,000 $ - $ - $ - $ 2,960,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 250,000 $ 250,000
$ 650,000 $ 1,750,000 $ 2,400,000
$ 100,000 $ 210,000 $ 310,000
$ 1,000,000 $ 1,960,000 $ - $ - $ - $ 2,960,000
$ 1,000,000 $ 1,960,000 $ 2,960,000
$ 1,000,000 $ 1,960,000 $ - $ - $ - $ 2,960,000
Planning
Design
Construction
Contingency

SOURCE(S)
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
General Plan Goals/Policies
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion
SS2402 - PINON-3 SEWER CAPACITY
Master Plan

TOTAL FUNDS

TOTAL USES
500 - Sewer Enterprise Fund
Goal CS.6, Policy CS.6.1; Goal GM.4, Policy GM.4.1
Summary of Capital Cost
Projected Budget
USE(S)
Description
The Pinon-2 project was completed in FY 2025/26, thereby replacing sewer lines along segments of Pinon Avenue and Orleans Drive along with pavement improvements. The Pinon-3 improvements as identified in the Sanitary Sewer Collection System Master Plan. This project includes the replacement of approximately 820 feet of 6-inch to 10-inch diameter pipeline along San Pablo Avenue, 680 feet of 8-inch to 10-inch diameter pipeline along Pinon Avenue, 890 feet of 6-inch to 8-inch diameter pipeline along Appian Way, 290 feet of 6-inch diameter pipeline along Meadow Avenue, and 290 feet of 6-inch diameter pipeline between Meadow Avenue and San Pablo Avenue with 2,970 feet of 10-inch to 15-inch diameter pipelines.

History, Status, or Impact if Delayed
The Sanitary Sewer Collection System Master plan identified capacity deficiencies which result in surcharging of the gravity sewer and cause sanitary sewer overflows (SSO's) during modeled peak wet weather flow (PWWF) conditions.

Page 334 of 374 ends

Project Origin : Priority Score : 52
Budget
New X Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 1,500,000.00 $ 1,600,000 $ - $ - $ - $ 3,100,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 450,000 $ 450,000
$ 850,000 $ 1,400,000 $ 2,250,000
$ 200,000 $ 200,000 $ 400,000
$ 1,500,000 $ 1,600,000 $ - $ - $ - $ 3,100,000
$ 1,500,000 $ 1,600,000 $ 3,100,000
$ 1,500,000 $ 1,600,000 $ - $ - $ - $ 3,100,000
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31

TOTAL FUNDS

TOTAL USES
Construction
Contingency

SOURCE(S)
500 - Sewer Enterprise Fund
SS2203 - EFFLUENT OUTFALL
Regulatory Requirement
USE(S)
Planning
Description
The Effluent Outfall project is intended to reduce pressure in the effluent pipe during extreme storm events. Effluent pumping capacity of the treatment plant is limited by the capacity of the pipe size at the effluent outfall in Rodeo.

Increasing the pipe size at the Effluent Outfall Eductor Station will increase the wet weather effluent pumping capacity and increase the lifespan of the effluent pipe by reducing the pressure in the line during storm events. This project requires coordination with Rodeo.

History, Status, or Impact if Delayed
The RWQCB adopted a 40% reduction in nitrogen discharge limits for the San Francisco Bay Region. Options to meet the future permit limits will be evaluated.

General Plan Goals/Policies
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Design
Summary of Capital Cost
Projected Budget
Policy GM.4.1, Goal CS.6, Policy CS.6.1
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion

Page 335 of 374 ends

Project Origin : Priority Score : 46
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 425,000.00 $ - $ - $ - $ - $ 425,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 315,000 $ 315,000
$ 67,500 $ 67,500
$ 42,500 $ 42,500
$ 425,000 $ - $ - $ - $ - $ 425,000
$ 425,000 $ 425,000
$ 425,000 $ - $ - $ - $ - $ 425,000
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction SC 3, SC 4
Contingency
Goal CS.1, Goal CS.6, Policy CS.6.1
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion
Description
The Water Pollution Control Plant (WPCP)/Treatment Plant has five secondary clarifiers which slow the flow to allow the microorganisms and other solids to settle to the bottom of the clarifier where they can be returned to aeration tanks to continue treating waste.

History, Status, or Impact if Delayed
Secondary Clarifiers 1 and 2 (SC1 and SC 2) were constructed in the early 1970s and are peripheral feed clarifiers. Secondary Clarifiers 3 and 4 (SC 3 and SC 4) were constructed in the early 1980s and are center feed clarifiers. Secondary Clarifier 5 (SC 5) was constructed in early 2000 and is a center feed, flocculator clarifier. In the first quarter of FY 2022-23, a preliminary inspection of the center column of the SC 5 was completed to examine the current condition and determine the scope of work for rehabilitation. In the second quarter of FY 2022-23, it was determined that SC 3 & SC 4 also require rehabilitation. Previously, this project was titled, "Secondary Clarifier - Center Column Rehabilitation" which only focused on the rehabilitation work required for SC 5.

General Plan Goals/Policies
SS2101 - SECONDARY CLARIFIER REHABILITATION
End of Life Cycle

TOTAL FUNDS

TOTAL USES

SOURCE(S)
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget
USE(S)
Design
Construction SC 5

Page 336 of 374 ends

Project Origin : Priority Score : 49
Budget
New Expansion
Replacement X Renovation
Land/Row Acq. Required
Rehabilitation
$ 200,000.00 $ - $ - $ - $ - $ 200,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 20,000 $ 20,000
$ 150,000 $ 150,000
$ 30,000 $ 30,000
$ 200,000 $ - $ - $ - $ - $ 200,000
$ 200,000 $ 200,000
$ 200,000 $ - $ - $ - $ - $ 200,000
Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction
Contingency
Policy GM.4.1, Goal CS.1, Policy CS.2.6
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion
Description
The California Environmental Laboratory Accreditation Program (ELAP) is responsible for accrediting environmental testing labs including the Pinole - Hercules WPCP. The 2019 ELAP inspection results indicated the lab apparatus, countertops, and the fume hood are past their useful life and recommended replacement. Staff has already received quotes to replace the appliances, countertops, and cabinets. Likely payements to contractors will take place in FY 2026/27.

History, Status, or Impact if Delayed
General Plan Goals/Policies
SS2002 - WATER POLLUTION CONTROL PLAN LAB REMODEL
Regulatory Requirement

TOTAL FUNDS

TOTAL USES

SOURCE(S)
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Design

Page 337 of 374 ends

Project Origin : Priority Score : 50
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 1,000,000.00 $ 4,350,000 $ 1,950,000 $ - $ - $ 7,300,000 6/30/2029
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 70,000 $ 70,000
$ 380,000 $ 380,000
$ 550,000 $ 4,000,000 $ 1,800,000 $ 6,350,000
$ 350,000 $ 150,000 $ 500,000
$ 1,000,000 $ 4,350,000 $ 1,950,000 $ - $ - $ 7,300,000 $ 1,000,000 $ 4,350,000 $ 1,950,000 $ 7,300,000
$ 1,000,000 $ 4,350,000 $ 1,950,000 $ - $ - $ 7,300,000 Project Estimate
FY 2026 - 2031
Functional Area : Sanitary Sewer
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction
Contingency
Policy GM.4.1, Goal CS.6, Policy CS.6.1
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion
Description
The City owns and operates two lift stations to convey flow from low lying areas to high elevations where the flow continues by gravity to the wastewater treatment plant. Both pump stations have reached the end of their useful life and need to be rehabilitated. The two pump stations are located on San Pablo Ave. and Hazel St. In FY 2019/20, this project was renamed to include both pump stations. Previously, this project was titled, “Hazel Street Sewer Pump Rehabilitation.” This project also includes the San Pablo Lift Station Force Main, approximately 640 feet of existing 6- inch will be replaced with 8-inch diameter force main.

History, Status, or Impact if Delayed
The City recently completed a Sanitary Sewer Master Plan. In the first fiscal year of construction, the Hazel Street Lift Station will be replaced, followed by the replacement of the San Pablo Ave. Lift Station. The Hazel Street Lift Station will be replaced in coordination with RO2301.

General Plan Goals/Policies
SS1702 - SEWER PUMP STATION REHABILITATION
End of Life Cycle

TOTAL FUNDS

TOTAL USES

SOURCE(S)
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Design

Page 338 of 374 ends

Project Origin : Priority Score :

Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 150,000 $ 120,000 $ 100,000 $ 90,000 $ 70,000 $ 630,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 8,000 $ 48,000
$ 120,000 $ 100,000 $ 80,000 $ 70,000 $ 55,000 $ 425,000 $ 20,000 $ 10,000 $ 10,000 $ 10,000 $ 7,000 $ 57,000
$ 150,000 $ 120,000 $ 100,000 $ 90,000 $ 70,000 $ 530,000 $ 150,000 $ 120,000 $ 100,000 $ 90,000 $ 70,000 $ 530,000 TOTAL FUNDS $ 150,000 $ 120,000 $ 100,000 $ 90,000 $ 70,000 $ 530,000 Construction
Contingency

TOTAL USES

SOURCE(S)
106 - Measure S 2014
Design
On April 7, 2015, the State Water Resources Control Board (SWRCB) adopted the Statewide Trash Provisions which address the impacts trash has on the beneficial uses of surface waters. The Trash Provisions establish a statewide water quality objective for trash and a prohibition of trash discharge. The City is required to demonstrate full compliance with the Trash Provisions by 2030, with preliminary milestones of 35% by 2026 and 70% by 2028. The City will complete this project as required under the State- Issued Trash Amendments and NPDES Permit. The tasks necessary to achieve compliance will include design, installation, and long-term maintenance of full trash capture devices. With the assistance of consulting services, before and after analysis and corrections to the stormwater map took place, and the City is now at almost 100% compliance. Additional improvements are being pursued to achieve regional credits, and grant funds is also being pursued to assist with the project costs.

History, Status, or Impact if Delayed
This project is needed to meet requirements or be potentially subjected to penalties.

General Plan Goals/Policies
Goal CS.7, Policy CS.7.1; Goals OS.1, Policy OS.1.2; Goal CC.2, Policy CC.2.2 Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ 100,000.00
Project Start 7/1/2025 Estimated Completion
SW2501 - STORMWATER UPGRADE & TRASH CAPTURE
Functional Area :

Type of CIP Unappropriated Subsequent Years

Page 339 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 150,000.00 $ 150,000 $ 150,000 $ 150,000.00 $ 150,000.00 $ 850,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000
$ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 600,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000
$ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 General Plan Goals/Policies
Delays in upgrades increased maintenance costs in past years and community impacts by flooding.

Project Estimate
FY 2026 - 2031
Functional Area : Stormwater
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Design

TOTAL FUNDS

TOTAL USES
Construction
Contingency

SOURCE(S)
106 - Measure S 2014
SW2401 - STORM DRAIN CREEK DISCHARGE & SYSTEM IMPROVEMENTS End of Life Cycle
USE(S)
Planning
Summary of Capital Cost
Projected Budget
Goal CS.7, Policy CS.7.1; Goals OS.1, Policy OS.1.2; Goal CC.2, Policy CC.2.2 Estimated
Expenditures
to-date
$ 100,000.00
Project Start 7/1/2025 Estimated Completion
Description
Improvements implemented in FY 2025/26 include replacement of the Delores Court stormwater pipeline, with remaining funds to be utilized in FY 2026/27. The condition assessments have identified a number of storm drain pipelines that are structurally deteriorated and failing where they discharge into Pinole Creek. A systematic rehabilitation or replacement of failing storm drain infrastructure will be prioritized as part of the Storm Drain Master Plan.

History, Status, or Impact if Delayed

Page 340 of 374 ends

Project Origin : Priority Score : 33
Budget
New X Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ 1,200,000 $ - $ - $ - $ 1,450,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 1,100,000 $ 1,100,000
$ 100,000 $ 100,000
$ - $ 1,200,000 $ - $ - $ - $ 1,200,000
$ 1,200,000 $ 1,200,000
$ - $ 1,200,000 $ - $ - $ - $ 1,200,000
Project Estimate
FY 2026 - 2031
Functional Area : Stormwater
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction
Contingency
Policy GM.4.1, Goal CS.7, Policy CS.7.1
Estimated
Expenditures
to-date
$ 250,000.00
Project Start 7/1/2025 Estimated Completion
Description
The existing system appears to have capacity issues at Roble Ave. and Encina Ave. that warrant review and upgrade.

This project will assess the collection system for capacity and hydraulic profile and upgrade the system as necessary.

Funding in the amount of $250,000 was reallocated from another project in FY 2025/26 in order to fund the planning, envrionemntal review, design, and construction cost estimates of the Roble Road Storm Drainage Improvements.

Staff will seek grant funds to pursue project construction in FY 2027/28.

History, Status, or Impact if Delayed
Delayed upgrades impacts increases maintenance costs.

General Plan Goals/Policies
SW2001 - ROBLE ROAD STORM DRAINAGE IMPROVEMENTS
Staff Recommendation

TOTAL FUNDS

TOTAL USES

SOURCE(S)
Unfunded
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Design

Page 341 of 374 ends

Project Origin : Priority Score :

Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 250,000 $ - $ - $ - $ - $ 250,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 40,000 $ 40,000
$ 210,000 $ 210,000
$ 250,000 $ - $ - $ - $ - $ 250,000
$ 250,000 $ 250,000
$ 250,000 $ - $ - $ - $ - $ 250,000
RO2601 - TRAFFIC CONTROL AND SAFETY IMPROVEMENTS ON SAN PABLO AVENUE Functional Area :

Type of CIP Unappropriated Subsequent Years
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2026 Estimated Completion
Design
This project will implement the following traffic operational and safety improvements: (1) Add a crosswalk across San Pablo Avenue at Fifth Avenue with associated ADA compliant curb ramps, equipped with a regulatory High-Intensity Activated CrosswalK (HAWK) signal; (2) Add a Rectangular Rapid Flashing Beacon (RRFB) at the existing crossing across San Pablo Avenue at Madrone Avenue; (3) Construct necessary widening of sidewalks to allow installation of accessible curb ramps and new poles of the HAWK and RRFB devices; (4) Construct necessary median improvements to improve crossings safety and allow installation of traffic control devices; and, (5) Improve signage and pavement markings on San Pablo Avenue between Third Avenue and Adams Court to enhance safety conditions. Local match to this grant will be funded by other projects.

History, Status, or Impact if Delayed
This project aims to improve safety conditions on San Pablo Avenue, including crossings safety by community members including seniors at Fifth Avenue.

General Plan Goals/Policies
Goal CE.4, Policy GM.3.3, Policy GM.3.7
Summary of Capital Cost
Projected Budget
USE(S)
Planning

TOTAL FUNDS
Construction
Contingency

TOTAL USES

SOURCE(S)
325 - Grant: TDA Article 3

Page 342 of 374 ends

Project Origin : Priority Score :

Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 350,000 $ - $ - $ - $ - $ 350,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 350,000 $ 350,000
$ 350,000 $ - $ - $ - $ - $ 350,000
$ 350,000 $ 350,000
$ 350,000 $ - $ - $ - $ - $ 350,000
RO2508 - ADA TRANSITION PLAN UPDATE
Functional Area :

Type of CIP Unappropriated Subsequent Years
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2025 Estimated Completion
Design
This is to update the City of Pinole 2004 ADA Transition Plan for Public Improvements. A number of updates to the guidelines and standards for the construction of new and the upgrading of existing public improvements have been issued by a number of federal and state agencies since 2004, thereby resulting in the need for updating the City's Plan. It should also be noted that locations of deficiencies and associated cost of improvements as described in the Transition Plan are outdated.

History, Status, or Impact if Delayed
Staff has been implementing public improvements based on the most up-to-date federal and state standards plans and specifications, which is somtimes inconsistent with the City's Transition Plan.

General Plan Goals/Policies
Goal CE.4, Policy GM.3.3, Policy GM.3.7
Summary of Capital Cost
Projected Budget
USE(S)
Planning

TOTAL FUNDS
Construction
Contingency

TOTAL USES

SOURCE(S)
325 - City Street Improvements

Page 343 of 374 ends

Project Origin : Priority Score :

Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 150,000 $ 850,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 30,000 $ 30,000 $ 20,000 $ 20,000 $ 20,000 $ 120,000
$ 150,000 $ 150,000 $ 120,000 $ 120,000 $ 120,000 $ 660,000 $ 20,000 $ 20,000 $ 10,000 $ 10,000 $ 10,000 $ 70,000
$ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 150,000 $ 850,000 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 150,000 $ 850,000 TOTAL FUNDS $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 150,000 $ 850,000 Construction
Contingency

TOTAL USES

SOURCE(S)
325 - City Street Improvements
Design
Following to the City’s Traffic Calming Policy and its future update, this project will fund the installation of physical traffic calming devices to reduce or eliminate the negative effects of auto traffic on residential streets. This can be achieved by causing drivers to reduce their driving speeds or to use alternative major corridors through the use of engineering solutions and the installation of physical devices. These devices could include driver feedback signs, curb extensions, speed cushions, and roundabouts. Traffic calming plans are developed based on data collection and analysis, as well as community outreach and consultation to alleviate neighborhood traffic concerns and community safety issues. Funding for FY 2025/26 was combined with the Pavement Rehabilitation Project for relevant traffic calming improvements.

History, Status, or Impact if Delayed
Reflect communities needs in street design and enhance safety conditions, which in turn reduce the need for traffic enforcement, General Plan Goals/Policies
Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2025 Estimated Completion
RO2506 - TRAFFIC CALMING PROGRAM
Functional Area :

Type of CIP Unappropriated Subsequent Years

Page 344 of 374 ends

Project Origin : Priority Score :

Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 50,000 $ 450,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 40,000
$ 80,000 $ 80,000 $ 80,000 $ 80,000 $ 50,000 $ 370,000
$ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 40,000
$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 50,000 $ 450,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 50,000 $ 450,000 TOTAL FUNDS $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 50,000 $ 450,000 Construction
Contingency

TOTAL USES

SOURCE(S)
325 - City Street Improvements
Design
The purpose of this annual Safe Routes to School (SR2S) project is to provide minor capital improvements to enhance the safety of pedestrians and bicyclists on public roads in school areas. In coordination with the City’s TAPS and the School District, staff will address safety concerns and develop strategies to encourage the use of alternative modes of transportation in the vicinity of schools. SR2S improvements may include enhancements to pavement markings, regulatory and advisory signs, installation of traffic control devices such as Rectangular Rapid Flashing Beacon (RRFB), and minor concrete improvements.

History, Status, or Impact if Delayed
Addressing community concerns in a timely manner, thereby enhancing the sense of safety and increasing walking and cycling.

General Plan Goals/Policies
Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2025 Estimated Completion
RO2505 - SAFE ROUTES TO SCHOOLS
Functional Area :

Type of CIP Unappropriated Subsequent Years

Page 345 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement X Renovation
Land/Row Acq. Required
Rehabilitation
$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 TOTAL FUNDS $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 Construction
Contingency

TOTAL USES

SOURCE(S)
325 - City Street Improvements
Design
Per the California Manual on Uniform Traffic Control Devices (MUTCD), local governments are required to maintain a minimum level of retro-reflectivity for longitudinal pavement markings and for signs. These standards promote safety while providing sufficient flexibility for agencies to choose a maintenance method that best matches their specific conditions. The purpose of this annual project is to upgrade and refresh existing pavement markings and replace damaged signs as needed throughout the City per the requirements set forth by the California Department of Transportation (Caltrans). It is recommended that this type of project be continued on an annual basis because the retro-reflectivity of pavement markings and signage degrade over time and can pose a safety hazard for road users.

FY 2025/26 funds was combined with the Pavement Rehabilitation Project to fund relevant improvements.

History, Status, or Impact if Delayed
Not meeting requirements and potential increase in maintenance and replacement costs.

General Plan Goals/Policies
Goal CE.3, Policy CE.3.2; Policy GM.3.3, Goal CS.10, Policy CS 10.2; Goal CE.7; Goal SE.8, Policy SE.8.7 Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2025 Estimated Completion
RO2504 - PAVEMENT MARKING AND SIGNAGE UPGRADES
Functional Area :

Type of CIP Unappropriated Subsequent Years

Page 346 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement X Renovation
Land/Row Acq. Required
Rehabilitation
$ 250,000 $ 250,000 $ 200,000 $ 200,000 $ 200,000 $ 1,100,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000
$ 220,000 $ 220,000 $ 180,000 $ 180,000 $ 180,000 $ 980,000 $ 20,000 $ 20,000 $ 10,000 $ 10,000 $ 10,000 $ 70,000
$ 250,000 $ 250,000 $ 200,000 $ 200,000 $ 200,000 $ 1,100,000 $ 250,000 $ 250,000 $ 200,000 $ 200,000 $ 200,000 $ 1,100,000 TOTAL FUNDS $ 250,000 $ 250,000 $ 200,000 $ 200,000 $ 200,000 $ 1,100,000 Construction
Contingency

TOTAL USES

SOURCE(S)
377 - Arterial Streets Rehabilitation
Design
This annual project will implement upgrades to City owned streetlights (currently within Pinole 523 streetlights owned by the City, and 902 streetlights owned by PG&E) and install new streetlights in areas where the streetlights do not meet standards for spacing and illumination. Adequate neighborhood street lighting improves safety by improving nighttime visibility and provides sidewalk and road users with an increased sense of security. Street lighting can also provide a sense of place and a more pleasing environment in residential and commercial areas, such as the addition of string lighting on San Pablo Avenue City’s downtown area.

History, Status, or Impact if Delayed
Adverse impacts on sense of safety and security, and increased City costs for maintenance and replacement.

General Plan Goals/Policies
Goal CS.1, Goal CS.2, Goal CS.10. Policy CS10.2
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
Project Start 7/1/2025 Estimated Completion
RO2503 - CITY STREETLIGHTS UPGRADE
Functional Area :

Type of CIP Unappropriated Subsequent Years

Page 347 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement X Renovation
Land/Row Acq. Required
Rehabilitation
$ 200,000 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 1,078,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 20,000 $ 20,000 $ 20,000 $ 10,000 $ 10,000 $ 80,000
$ 150,000 $ 150,000 $ 150,000 $ 120,000 $ 120,000 $ 690,000 $ 30,000 $ 30,000 $ 30,000 $ 20,000 $ 20,000 $ 130,000
$ 200,000 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 900,000 $ 200,000 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 900,000 TOTAL FUNDS $ 200,000 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 900,000 Construction
Contingency

TOTAL USES

SOURCE(S)
377 - Arterial Streets Rehabilitation
Design
The purpose of this project is to assess the consistency of the City’s traffic signal equipment and make improvements to City-owned signals such as through the installation of video detection, accessible pedestrian signal devices, upgrade of controller and cabinet, upgrade of software, battery back-up system and/or establishment of designated left-turn phasing.

Having consistent signal equipment at all City signalized intersections will save on maintenance costs and provide the best operational efficiency and safety for our residents. Key improvements will be made in coordination with the City’s Traffic and Pedestrian Safety Commission (TAPS). This annual program is not intended to design and construct new signals due to the high costs associated with a new installation. New signal installation will typically be accompanied by a new development as a project mitigation, or as an individual City CIP subject to meeting signal warrants. FY 2025/26 funds was dedicated to the installation of ADA compliant pedestrian push buttons at 18 traffic signals with the remaining fund to be used in FY 2026/27.

History, Status, or Impact if Delayed
Delayed upgrades increase the cost of maintenance and cost of capital improvements.

General Plan Goals/Policies
Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ 178,000.00
Project Start 7/1/2025 Estimated Completion
RO2502 - PINOLE SIGNALS UPGRADE
Functional Area :

Type of CIP Unappropriated Subsequent Years

Page 348 of 374 ends

Project Origin : Priority Score : 49
Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 150,000.00 $ 150,000 $ 150,000 $ 150,000.00 $ 150,000.00 $ 750,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 135,000 $ 135,000 $ 135,000 $ 135,000 $ 135,000 $ 675,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 75,000
$ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 TOTAL FUNDS $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 Construction
Contingency

TOTAL USES

SOURCE(S)
325 - City Street Improvements
Design
Title II of the Americans with Disability Act (ADA) requires local governments to make pedestrian crossings accessible to people with disabilities by providing curb ramps. To allow people with disabilities to cross streets safely, local governments must provide curb ramps at pedestrian crossings and at public transportation stops where walkways intersect with a vertical curb. To comply with ADA requirements, the curb ramps provided must meet specific standards for width, slope, cross slope, placement, and other features. Per ADA standards, all streets constructed after January 26, 1992 must provide curb ramps in compliance with ADA standards. In addition, any street that was constructed prior to 1992, but was altered after 1992, must also provide ADA-compliant curb ramps. The purpose of this project is to upgrade existing pedestrian curb ramps and to install new pedestrian curb ramps at high priority areas and locations with high levels of pedestrian activity. Some of the FY 2025/26 funds were combined with the Pavement Rehabilitation Project for implementation of ADA compliant curb ramps.

History, Status, or Impact if Delayed
Following ADA compliance is a requirement. Delays in pursuing these improvements could adversely impact the community's accessibility and safety needs, and potentially subject the City to liabilities.

General Plan Goals/Policies
Goal CE.4, Policy CE.4.5; Goal SE.8, Policy SE.8.7; Goal CE.1, Policy CE.1.4; Goal CE.3, Policy CE.3.2; Goal CS.2, Policy CS.2.6; Goal CS.10, Policy CS 10.2; Goal H.3, Policy H.3.1; Goal GM.3, Policy GM.3.7; Goal HS.6, Policy HS.6.1
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
to-date
Project Start 7/1/2025 Estimated Completion
RO2501 - ACCESSIBILITY IMPROVEMENTS PROJECT
Functional Area : Streets & Roads Staff Recommendation
Type of CIP Unappropriated Subsequent Years

Page 349 of 374 ends

Project Origin : Priority Score : 65
Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ 50,000 $ - $ - $ - $ 50,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 5,000 $ 5,000
$ 45,000 $ 45,000
$ - $ 50,000 $ - $ - $ - $ 50,000
$ 50,000 $ 50,000
TOTAL FUNDS $ - $ 50,000 $ - $ - $ - $ 50,000
Construction
Contingency

TOTAL USES

SOURCE(S)
106 - Measure S 2014
Design
Assessment of the intersections control and establishment of crosswalks (high visibility) at the intersections of Tennent Avenue at Prune Street. This assessment is planned to be performed by staff in FY 2026/27 with construction/implementation planned for FY 2027/28.

History, Status, or Impact if Delayed
General Plan Goals/Policies
Goal CS.10, Policy CS.10.2; Goal SE.8, Policy SE.8.8; Goal HS.6, Policy HS.6.1; Goal CE.4; Goal CS.2, Policy CS.2.6 Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2026 Estimated Completion
RO2404 - CROSSWALK TENNENT AVE AT PRUNE ST
Functional Area : Streets & Roads Council Request
Type of CIP Unappropriated Subsequent Years

Page 350 of 374 ends

Project Origin : Priority Score : 58
Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 100,000 $ 200,000 $ 900,000 $ - $ - $ 1,200,000
6/30/2029
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 10,000 $ 50,000 $ 200,000 $ 260,000
$ 90,000 $ 150,000 $ 700,000 $ 940,000
$ 100,000 $ 200,000 $ 900,000 $ - $ - $ 1,200,000
$ 100,000 $ 200,000 $ 300,000 $ 600,000
$ 600,000 $ 600,000
TOTAL FUNDS $ 100,000 $ 200,000 $ 900,000 $ - $ - $ 1,200,000 Construction
Contingency

TOTAL USES

SOURCE(S)
325 - City Street Improvements
Unfunded
Design
ADA compliant curb ramps were implemented in the Downtown area in FY 2025/26. Minor improvements are planned in FY 2026/27 such as street furniture, string lighting, and other measures to improve the road enviroment for users. Additional more significant improvements will be implemented in future years especially following constriction of the San Pablo Avenue Bridge Replacement Project. Such improvements will include traffic calming devices, bicycle facilities, improved pedestrian facilities, improved lighting, etc. San Pablo Avenue is an important regional corridor, and staff will pursue grant funds to design and implement future improvements.

History, Status, or Impact if Delayed
This project will implement improvements in Old Town gradually given the significant upgrades needed.

General Plan Goals/Policies
Goal GM.2, Policy GM.3.3, Policy GM.3.7; Goal SE.8, Policy SE.8.7; Goal CE.1, Policy CE.1.4; Goal CE.3, Policy CE.3.2; Goal CE.4, Policy CE.4.5; Goal CE.5; Goal CS.10, Policy CS.10.2 Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
To-Date
$ -
Project Start 7/1/2026 Estimated Completion
RO2403 - OLD TOWN TRAFFIC CALMING
Functional Area : Streets & Roads Council Request
Type of CIP Unappropriated Subsequent Years

Page 351 of 374 ends

Project Origin : Priority Score : 49
Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 200,000.00 $ 200,000 $ 200,000 $ 200,000.00 $ 200,000.00 $ 1,000,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 25,000
$ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 900,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 75,000
$ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,000,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,000,000 TOTAL FUNDS $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,000,000

TOTAL USES
Contingency

SOURCE(S)
325 - City Street Improvements
Design
Construction
Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Goal CE.4, Policy CE.4.5; Goal SE.8, Policy SE.8.7; Goal CE.1, Policy CE.1.4; Goal CE.3, Policy CE.3.2; Goal CS.2, Policy CS.2.6; Goal CS.10, Policy CS 10.2; Goal H.3, Policy H.3.1; Goal GM.3, Policy GM.3.7; Goal HS.6, Policy HS.6.1
Estimated
Expenditures
to-date
Project Start
RO2402 - SIDEWALK REHABILITATION PROGRAM
Staff Recommendation
USE(S)
Planning
7/1/2025 Estimated Completion
Description
According to the California Streets and Highway Code, the owner of a property fronting a public street must maintain the sidewalk, curb and gutter, and park strip area in a condition that will not endanger persons or property or interfere with the convenient use of the area. Purpose of this annual program is to assist property owners in maintaining the sidewalks in a safe manner. In doing so, the program assists residents in maintaining the condition of walkways for which they have maintenance responsibility.

History, Status, or Impact if Delayed
General Plan Goals/Policies
Summary of Capital Cost
Projected Budget

Page 352 of 374 ends

Project Origin : Priority Score : 69
Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 350,000.00 $ 350,000 $ 350,000 $ 350,000.00 $ 250,000.00 $ 1,750,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ -
$ 320,000 $ 320,000 $ 320,000 $ 320,000 $ 220,000 $ 1,500,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 150,000
$ 350,000 $ 350,000 $ 350,000 $ 350,000 $ 250,000 $ 1,650,000 $ 350,000 $ 350,000 $ 350,000 $ 350,000 $ 250,000 $ 1,650,000 $ 350,000 $ 350,000 $ 350,000 $ 350,000 $ 250,000 $ 1,650,000 General Plan Goals/Policies
Goal CE.3, Policy CE.3.2; Policy GM.3.3, Goal CS.10, Policy CS 10.2; Goal CE.7; Goal SE.8, Policy SE.8.7 Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Design

TOTAL FUNDS

TOTAL USES
Construction
Contingency

SOURCE(S)
105 - Measure S 2006
RO2401 - ROAD MAINTENANCE REPAIRS
Staff Recommendation
USE(S)
Planning
Summary of Capital Cost
Projected Budget
Estimated
Expenditures
to-date
$ 100,000.00
Project Start 7/1/2025 Estimated Completion
Description
The City was devided into five zones to allow for a proactive approach in maintaining the roads including potholing, repair of street lights, replacement of faded and missing signs, enhancement of pavement markings, etc. It should be noted that these improvements are in addition to the citywide maintenance activities in response to public requests.

It should also be noted that $250,000 of the FY 2025/26 funds had to be reassigned to the Roble Road Stormwater Improvements Project to ensure continuation of the project's environmental review and design.

History, Status, or Impact if Delayed

Page 353 of 374 ends

Project Origin : Priority Score : 33
Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 100,000.00 $ - $ - $ - $ - $ 100,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 100,000 $ 100,000
$ 100,000 $ - $ - $ - $ - $ 100,000
$ 100,000 $ 100,000
$ 100,000 $ - $ - $ - $ - $ 100,000
Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction
Contingency
Goal CS.10, Policy CS 10.2
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion
Description
The Smart Signals project will develop, manage, and implement ITS initiatives that improve the safety and efficiency of multimodal mobility, maximize highway and arterial system throughput, and improve operational efficiency, safety, and reduce environmental impact throughout Contra Costa County. Contra Costa Tranportation Authority is the project lead and will coordinate the project throughout the county. Twelve traffic signals have been identified as candidates for the Smart Signals project. These signals are located on Pinole arterial roadways (Appian Way & San Pablo Avenue).

History, Status, or Impact if Delayed
Deployment of the Smart Signals Project is expected to result in operational and safety improvements for all modes of transportation, such as decrease in travel time and total delay, reduction in number of stops and secondary accidents, reduction of fuel consumption and greenhouse gas emissions, and reduction of response time for emergency vehicles. The initial cost estimate of construction is $1,499,829 of which CCTA will receive $1,345,527 in OBAG funds. The City's match requirement of $154,302 was paid in FY 2023/24. The additional match/contingency of $100,000 is programmed to secure the upcoming implementation of improvements that will soon commence sequencially in the various cities and in unincorporated county areas.

General Plan Goals/Policies
RO2303 - PINOLE SMART SIGNALS
Staff Recommendation

TOTAL USES

TOTAL FUNDS

SOURCE(S)
276 - Growth Impact Fees
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Design

Page 354 of 374 ends

Project Origin : Priority Score : 38
Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 439,040.00 $ - $ - $ - $ - $ 439,040
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 30,000 $ 30,000
$ 380,000 $ 380,000
$ 29,040 $ 29,040
$ 439,040 $ - $ - $ - $ - $ 439,040
$ 239,040 $ 239,040
$ 200,000 $ 200,000
$ 439,040 $ - $ - $ - $ - $ 439,040
Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
USE(S)
Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2025 Estimated Completion
Description
This project will install pedestrian crossing enhancements at three crossings on arterial roadways. The enhancements include continental crosswalk markings, median refuge islands, advanced stop bars and Rectangular Rapid Flash Beacons (RRFB). The three crossings are: San Pablo Avenue at Third Avenue; San Pablo Avenue at Quinan Street; and Pinole Valley Road at Savage Avenue. 90% design plans have been produced and currently coordinating with Caltrans prior to initiating the Request for Bids for project construction.

History, Status, or Impact if Delayed
Some of the project funding for improvements was secured through Cycle 11 HSIP grant funds.

General Plan Goals/Policies
RO2302 - SAFETY IMPROVEMENTS ON ARTERIAL ROADWAYS
Staff Recommendation
Planning
Contingency

TOTAL FUNDS

TOTAL USES
Construction
Design

SOURCE(S)
215 - Grant: HSIP
377 - Arterial Streets Rehabilitation
Summary of Capital Cost
Projected Budget

Page 355 of 374 ends

Project Origin : Priority Score : 34
Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ 2,810,000.00 $ 1,500,000 $ 1,500,000 $ 1,500,000.00 $ 1,500,000.00 $ 8,810,000 6/30/2031
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 76,525 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 776,525 $ 2,600,000 $ 4,600,000 $ 4,600,000 $ 3,450,000 $ 2,700,000 $ 17,950,000 $ 133,475 $ 200,000 $ 200,000 $ 150,000 $ 150,000 $ 833,475 $ 2,810,000 $ 5,000,000 $ 5,000,000 $ 3,750,000 $ 3,000,000 $ 19,560,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 3,750,000 $ 2,000,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 5,000,000 $ 60,000 $ 60,000
TOTAL FUNDS $ 2,810,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 8,810,000

TOTAL USES
Construction
Contingency

SOURCE(S)
215 - Measure J
200 - Gas Tax
325 - Grant: STMP Fees
Design
Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2025
RO2301 - ROAD REHABILITATION
Pavement Management Program
USE(S)
Planning
Estimated Completion
Description
Based on the most current P-TAP report and field inspections, various segments will be recommended annually for rehabilitation. The purpose of this annual program is to rehabilitate and maintain the City’s pavement condition. This project will prolong the lifespan of the current pavement and prevent further deterioration and reduction in the Pavement Condition Index (PCI – a numerical rating system from 0/complete failure to 100/excellent condition).

Depending on the assessed PCI and type of deficiencies, this project will include preventive measures such as crack sealing, slurry seal, micro-surfacing, and cape seal for pavement in fair to good condition. Restoration measures such as grind and overlay, dig-outs, and cold-in-place recycling for pavement in fair to poor condition.

Rehabilitation/Reconstruction measures to remove and replace pavement in poor to failed condition.

History, Status, or Impact if Delayed
Continued deterioration of pavement conditions on the various road types, thereby resulting in higher maintenance and reconstruction costs. It should be noted that the total budget for FY 2025/26-FY2026/27 is $3,150,000 given the additional supplemntal funds under the signaning and striping project, traffic calming project and others. For future fiscal years, the preliminary assumption is to use Gas Tax and Measure J funds until additional fund is secured such as the Vehicle Impact Fees.

General Plan Goals/Policies
Summary of Capital Cost
Projected Budget

Page 356 of 374 ends

Project Origin : Priority Score : 43
Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
X Rehabilitation
$ - $ 750,000 $ - $ - $ - $ 787,805
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 80,000 $ 80,000
$ 650,000 $ 650,000
$ 20,000 $ 20,000
$ - $ 750,000 $ - $ - $ - $ 750,000
$ 180,000 $ 180,000
$ 300,000 $ 300,000
$ 270,000 $ 270,000
$ - $ 750,000 $ - $ - $ - $ 750,000
General Plan Goals/Policies
Policy CE.1.4, Policy CS.2.6, Policy CS.3.3, Policy H.3.1, Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2 Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Design

TOTAL FUNDS

TOTAL USES
Construction
Contingency

SOURCE(S)
200 - Gas Tax
500 - Sewer Enterprise Fund
325 - City Street Improvements
RO2102 - TENNENT AVE REHABILITATION
Pavement Management Program
USE(S)
Planning
Summary of Capital Cost
Projected Budget
Estimated
Expenditures
to-date
$ 37,805.00
Project Start 7/1/2027 Estimated Completion
Description
The construction impacts from the WPCP upgrade project resulted in pavement deterioration. This project will rehabilitate Tennent Avenue from San Pablo Avenue to the WPCP. In February 2021, the City selected a consultant to complete the preliminary engineering for this project.

History, Status, or Impact if Delayed
In preparation of this project, the City retained a consultant to perform internal CCTV on this section of roadway. The inspection was completed in early 2021. Coordinating collection system improvements with street resurfacing projects ensures that sewer improvements are made prior to the resurfacing so that manholes and valve covers may be properly realigned, and repairs and replacements are made in a cost-effective manner. This also avoids cutting and patching recently paved streets. The City of Hercules will reimburse $86,430 for this project. In addition, this project is being coordinated with RO1902 for efficient implementation.

Page 357 of 374 ends

Project Origin : Priority Score : 50
Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 1,345,000.00 $ 1,120,000 $ - $ - $ - $ 2,545,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 75,000 $ 75,000
$ 1,150,000 $ 1,000,000 $ 2,150,000
$ 120,000 $ 120,000 $ 240,000
$ 1,345,000 $ 1,120,000 $ - $ - $ - $ 2,465,000
$ 745,000 $ 700,000 $ 1,445,000
$ 600,000 $ 420,000 $ 1,020,000
$ 1,345,000 $ 1,120,000 $ - $ - $ - $ 2,465,000
General Plan Goals/Policies
Policy CE.1.4, Policy CS.2.6, Policy CS.3.3, Policy H.3.1, Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2 Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Design

TOTAL FUNDS

TOTAL USES
Construction
Contingency

SOURCE(S)
325 - Grant: STMP Fees
215 - Grant: OBAG
RO1902 - TENNENT AVENUE/BAY TRAIL GAP CLOSSURE CROSSIN OF UPRR Staff Recommendation
USE(S)
Planning
Summary of Capital Cost
Projected Budget
Estimated
Expenditures
to-date
$ 80,000.00
Project Start 7/1/2025 Estimated Completion
Description
In 2018, the East Bay Regional Park District completed a trail link to connect Pinole Shores Regional Shoreline to Bayfront Park trail. There remains a small gap on Tennent Ave. from Bayfront Park to Railroad Ave. Improvements to Tennent Ave. at the Railroad Crossing will facilitate safe movement of bicycles and pedestrians. Since project inception, the scope of work has evolved to include improvements that would maximize parking on Railroad Avenue for park users. In February 2021, the City selected a consultant to complete the preliminary engineering for this project.

History, Status, or Impact if Delayed
WCCTAC held its STMP Call for Projects in 2018 which committed $100k in funding for preliminary engineering from the 2006 STMP program for this project. City staff also submitted an OBAG 3 application in July 2022 to compete for funding for this project. If awarded, the City will need a match of $345k.

Page 358 of 374 ends

Project Origin : Priority Score : 55
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 2,894,000.00 $ 1,340,000 $ 27,518,000 $ - $ - $ 33,232,000 6/30/2029
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 200,000 $ 200,000 $ 1,150,000 $ 1,550,000
$ 2,194,000 $ 940,000 $ 3,134,000
- $ 25,868,000 $ 25,868,000
$ 100,000 $ 100,000 $ 200,000
$ 2,494,000 $ 1,240,000 $ 27,018,000 $ - $ - $ 30,752,000 $ 2,394,000 $ 940,000 $ 27,018,000 $ 30,352,000
$ 500,000 $ 400,000 $ 500,000 $ 1,400,000
$ 2,894,000 $ 1,340,000 $ 27,518,000 $ - $ - $ 31,752,000 Project Estimate
FY 2026 - 2031
Functional Area : Streets & Roads
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
USE(S)
Estimated
Expenditures
to-date
$ 1,480,000.00
Project Start 7/1/2020
Policy CS.3.3, Goal H.3, Policy H.3.1, Goal CE.3, Goal CE. 7, Policy CE.7.3, Goal CS.10.

Estimated Completion
Description
The San Pablo Avenue bridge over the Burlington Northern Santa Fe (BNSF) Railroad is an integral part of the area’s transportation network. The age (80 years old) and condition assessment (deficient) of the bridge supports replacement. The City was approved for initial funding from the Caltrans Highway Bridge Program (HBP). In February 2020, the City awarded a contract to a consultant for preliminary engineering (PE) to advance the project. The PE will be completed in two phases due to funding limitations. Completion of preliminary design is necessary to develop a final cost estimate for the project.

History, Status, or Impact if Delayed
General Plan Goals/Policies
Caltrans approved all technical environmental studies with NEPA and CEQA planned for approval by the end of FY 2025/26. Design and right-of-way phase to commence in July of 2026 followed by construction in late 2027-early 2028. Construction is expected to take two years given the need to construct a temporary bridge while the permanent bridge is under construction.

RO1710 - SAN PABLO AVENUE BRIDGE OVER BNSF RAILROAD
End of Life Cycle

TOTAL FUNDS
325 - Grant: STMP Fees

TOTAL USES
Project Management
Planning & Design & R-O-W
Construction
Contingency

SOURCE(S)
325 - Grant: HBP
Summary of Capital Cost
Projected Budget

Page 359 of 374 ends

Project Origin : Priority Score : 55
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ - $ - $ - $ - $ 25,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ - $ - $ - $ - $ - $ -
TOTAL FUNDS $ - $ - $ - $ - $ - $ -
Construction
Contingency

TOTAL USES

SOURCE(S)
Planning & Design & R-O-W
The Study aims to identify and evaluate enhancements to bicycle and pedestrian improvements along San Pablo Avenue from Richmond Parkway to the Pinole-Hercules city limit. The County will lead the Study and associated reporting to MTC on the RM3 funds to be expended within the set Study budget and schedule. In addition to sharing the local match, the attached Cooperative Agreement, for example, outlines collaboration between the County and the City on developing the Study scope of work, selection of the consultant, and participation in staff; policy and technical meetings. The Study recommendations for improvements within Pinole will be developed based on adopted City policies and priorities, and approval of the recommendations will be within the City Council discretion.

History, Status, or Impact if Delayed
Contra Costa County in coordination with the City of Pinole, submitted an application for Cycle 1 of the RM3 program to fund the San Pablo Avenue Enhanced Bicycle and Pedestrian Gap Closure Study. The Study was one of seven projects selected by MTC for funding with a total project cost of $500,000 including $425,000 of RM3 funds and $75,000 local match. The local match to be shared between the County (share of $50,000) and the City (share of $25,000) as detailed in the Cooperative Agreement approved by the County Board on June 10, 2025 and by the City Council on July 1, 2025.

General Plan Goals/Policies
Policy CS.3.3, Goal H.3, Policy H.3.1, Goal CE.3, Goal CE. 7, Policy CE.7.3, Goal CS.10.

Summary of Capital Cost
Projected Budget
USE(S)
Project Management
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
to-date
$ 25,000.00
Project Start 7/1/2025 Estimated Completion
IN2501 - SAN PABLO AVENUE BICYCLE AND PEDESTRIAN GAP CLOSURE Functional Area : Streets & Roads End of Life Cycle
Type of CIP Unappropriated Subsequent Years

Page 360 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ 200,000 $ - $ - $ - $ 200,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 200,000 $ 200,000
$ - $ 200,000 $ - $ - $ - $ 200,000
$ 200,000 $ 200,000
$ - $ 200,000 $ - $ - $ - $ 200,000
Project Estimate
FY 2026 - 2031
Functional Area : Infrastructure Assessment
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Construction
Contingency
Goal CS.1, Policy CS.1.3, Policy CS.2, Policy CS.2.6
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2027 Estimated Completion
Description
The facilities master plan will serve as a roadmap for achieving identified strategic objectives to improve service delivery and utilization of real estate and facility assets. The masterplan will serve to aid decision-making on capital improvements for a defined list of City owned facilities and provide information on potential major maintenance needs (e.g., repairs vs. replace) as applicable.

History, Status, or Impact if Delayed
General Plan Goals/Policies
IN2301 - FACILITIES & REAL ESTATE MASTER PLAN
Staff Recommendation

TOTAL FUNDS

SOURCE(S)
106 - Measure S 2014

TOTAL USES
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Design

Page 361 of 374 ends

Project Origin : Priority Score : 55
Budget
New Expansion
X Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 20,000.00 $ - $ - $ - $ - $ 238,000
10/30/2026
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 20,000 $ 20,000
-
$ 20,000 $ - $ - $ - $ - $ 20,000
$ 20,000 $ 20,000
TOTAL FUNDS $ 20,000 $ - $ - $ - $ - $ 20,000
Construction
Contingency

TOTAL USES

SOURCE(S)
106 - Measure S 2014
Planning & Design & R-O-W
Development of the City’s Active Transportation Plan (ATP) was first added to the Capital Improvement Plan (CIP) in 2021 (Project IN2106). On March 7, 2023, the City Council approved a Consulting Services Agreement between the City and GHD, Inc. for the development of the City’s ATP. The ATP aims to outline strategies and actions that will support and encourage the use of environmentally sustainable modes of travel including walking, cycling, and use of public transit. The consultant’s work scope included a review of policies and plans, data collection and analysis, recommend strategies and capital improvement projects, develop concept improvements that incorporate the community’s feedback, and develop a cost estimate for the recommended projects.

History, Status, or Impact if Delayed
The ATP was approved by the City Council on April 21, 2026. The additional scope and associated cost will fund additional community consultation/community workshop and any potential plan update that may be arise as a result.

General Plan Goals/Policies
Policy CS.3.3, Goal H.3, Policy H.3.1, Goal CE.3, Goal CE. 7, Policy CE.7.3, Goal CS.10.

Summary of Capital Cost
Projected Budget
USE(S)
Planning
Description
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Project Estimate
FY 2026 - 2031
Estimated
Expenditures
to-date
$ 218,000.00
Project Start 7/1/2021 Estimated Completion
IN2106 - ACTIVE TRANSPORTATION PLAN
Functional Area : Streets & Roads End of Life Cycle
Type of CIP Unappropriated Subsequent Years

Page 362 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 200,000.00 $ - $ - $ - $ - $ 200,000
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 200,000 $ 200,000
$ 200,000 $ - $ - $ - $ - $ 200,000
$ 100,000 $ 100,000
$ 100,000 $ 100,000
$ 200,000 $ - $ - $ - $ - $ 200,000
This project will connect with the Contra Costa County’s project to provide continuous sidewalks and bike lanes along Appian Way from San Pablo Dam Rd. in unincorporated El Sobrante. This project will involve coordination with Contra Costa County. This is a valuable project, and its planning and design need to proceed not to jeopradise the regional grant fund. The construction phase of this project is currently unfunded and appears in the Unfunded and Unprogrammed list.

General Plan Goals/Policies
Project Estimate
FY 2026 - 2031
Functional Area : Infrastructure Assessment
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
Contingency
USE(S)

TOTAL FUNDS

TOTAL USES

SOURCE(S)
325 - Grant: STMP Fees
377 - Arterial Streets Rehabilitation
IN2105 - APPIAN WAY COMPLETE STREETS
Staff Recommendation
Planning
Design
Construction
Summary of Capital Cost
Projected Budget
Policy CE.1.4, Policy CS.2.6, Policy CS.3.3, Policy H.3.1, Policy GM.3.3, Goal CE.3, Goal CS.10, Policy CS 10.2 Estimated
Expenditures
to-date
$ -
Project Start 7/1/2026 Estimated Completion
Description
Completion of preliminary engineering and design to provide continuous sidewalks and bike lanes along Appian Way beginning from unincorporated El Sobrante to about 1500 linear feet north of the City limit within Pinole. In December 2021, City Council approved a Cooperative Funding Agreement with WCCTAC to receive STMP funds to complete preliminary design for this project.

History, Status, or Impact if Delayed

Page 363 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 100,000.00 $ - $ - $ - $ - $ 115,152
6/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 100,000 $ 100,000
$ 100,000 $ - $ - $ - $ - $ 100,000
$ 100,000 $ 100,000
$ 100,000 $ - $ - $ - $ - $ 100,000
Project Estimate
FY 2026 - 2031
Functional Area : Infrastructure Assessment
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
USE(S)
Policy OS.8.1, Policy OS.8.7, Goal SE.9, Policy SE.9.1, Policy SE.9.4 Estimated
Expenditures
to-date
$ 15,152.25
Project Start 7/1/2025 Estimated Completion
Description
Updated Recycled Water feasibility study and master plan will allow the City to plan and phase the construction of future recycled water distribution system infrastructure. The study will identify potential recycled water customers, evaluate the quantity, quality, and recycled water distribution system options to address the needs of potential users in surrounding areas, seek opportunities to phase the construction of a recycled water delivery system, and develop planning-level cost options for the phased system.

History, Status, or Impact if Delayed
Recycled water delays or eliminates the need to construct more potable water facilities, sustains the economy with increased water supply reliability, protects the environment, safeguards investments in parks and landscaping with drought proof or drought resistant water supply, and contributes to a green and healthy environment. In 2019, East Bay Municipal Utility District (EBMUD) prepared an Updated Recycled Waster Plan which considered the potential for potable reuse in EBMUD’s water service area. The development of a new recycled water supply for the Phillips 66 refinery in Rodeo using effluent from the Pinole-Hercules and Rodeo wastewater treatment plants was among the recommended non-potable reuse projects. This project is estimated to deliver up to 3.67 MGD of recycled water to the refinery for use in their boilers and cooling towers. The combined final disinfected effluent from both plants would be pumped at the Rodeo Pump Station to the refinery for treatment a new advanced recycled water treatment plan. This project was recommended by EBMUD because it would deliver a large amount of water to a single customer, with comparatively few pipelines required due to the short distance between the sources of wastewater and the Phillips 66 Refinery.

General Plan Goals/Policies
IN2103 - RECYCLED WATER FEASIBILITY
Council Request

TOTAL FUNDS

TOTAL USES
Planning
Design
Construction
Contingency

SOURCE(S)
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget

Page 364 of 374 ends

Project Origin : Priority Score :

Budget
X New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ - $ 200,000 $ - $ - $ - $ 200,000
6/30/2028
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 200,000 $ 200,000
$ - $ 200,000 $ - $ - $ - $ 200,000
$ 200,000 $ 200,000
$ - $ 200,000 $ - $ - $ - $ 200,000
Design
Construction
Contingency

TOTAL FUNDS

TOTAL USES

SOURCE(S)
100 - General Fund
Summary of Capital Cost
Projected Budget
USE(S)
Planning
Policy GM.4.1, Policy CS.2.6, Goal CS.9, Goal HS.4
Estimated
Expenditures
to-date
$ -
Project Start 7/1/2027 Estimated Completion
Description
During severe natural hazard events, it is highly likely that utility power will not be available for an extended period of time. Critical facilities will need reliable sources of sustained electrical power to continue operations. This project will:
1) identify critical facilities in need of back-up power in coordination with an Emergency Operations Plan (EOP) , 2) assess power loads in each critical facility that requires back-up power, 3) determine the costs and technology options including solar battery storage, and 4) make any additional recommendations to Council before advancing to construction.

History, Status, or Impact if Delayed
The Public Safety Building, Fire Station 74, and the Water Pollution Control Plant have stand by generators.

General Plan Goals/Policies
IN2101 - EMERGENCY POWER FOR CRITICAL FACILITIES
Council Request
Project Estimate
FY 2026 - 2031
Functional Area : Infrastructure Assessment
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31

Page 365 of 374 ends

Project Origin : Priority Score :

Budget
New Expansion
Replacement Renovation
Land/Row Acq. Required
Rehabilitation
$ 275,000.00 $ - $ - $ - $ - $ 455,060
10/30/2027
Budget Project Estimate
FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 FY 2030-31 FY 2026 - 2031 $ 275,000 $ 275,000
$ 275,000 $ - $ - $ - $ - $ 275,000
$ 75,000 $ 75,000
$ 200,000 $ 200,000
$ 275,000 $ - $ - $ - $ - $ 275,000
Project Estimate
FY 2026 - 2031
Functional Area : Infrastructure Assessment
Type of CIP Unappropriated Subsequent Years
Year 1
FY 2026-27
Year 2
FY 2027-28
Year 3
FY 2028-29
Year 4
FY 2029-30
Year 5
FY 2030-31
USE(S)
Policy GM.4.1, Policy CS.7.1
Estimated
Expenditures
to-date
$ 180,060.00
Project Start 7/1/2024 Estimated Completion
Description
Preparation of a storm drain master plan will provide an analysis of the existing collection system. The plan will identify system deficiencies related to capacity, functionality, and permit compliance. The plan can serve to guide future budget allocations for improvements to the system.

History, Status, or Impact if Delayed
General Plan Goals/Policies
IN1703 - STORM DRAIN MASTER PLAN
Staff Recommendation

TOTAL FUNDS

TOTAL USES
Planning
Design
Construction
Contingency

SOURCE(S)
106 - Measure S 2014
500 - Sewer Enterprise Fund
Summary of Capital Cost
Projected Budget

Page 366 of 374 ends

Goals and Policies
Community Character Element
GOAL CC.1 Maintain Pinole’s unique qualities and sense of place to preserve the established historic and small-town character of the city.

POLICY CC.1.2 Require all new development to incorporate high-quality site design, architecture and planning to enhance the overall quality of the built environment in Pinole and create a visually interesting and aesthetically pleasing town environment.

POLICY CC.1.3 To enhance a sense of arrival and create a strong appealing image that promotes community identity, the City shall develop community entry features at key gateways or city entries along Interstate 80. Entryways shall incorporate landscaping, trees, structural architectural elements, signage and public art.

POLICY CC.1.5 Encourage project compatibility, interdependence and support with neighboring uses, especially between commercial and mixed-use centers and the surrounding residential neighborhoods. Uses should relate to one another with pedestrian connections, transit options, shared parking, landscaping, public spaces, and the orientation and design of buildings.

GOAL CC.2 Emphasize and enhance the visual and physical connection between the city’s natural environment and the community’s quality of life.

POLICY CC.2.1 Provide visual and physical connections between the natural environment and the built environment through careful site design, building placement, architectural features that allow views of Pinole’s unique environment such as ridgelines or the San Pablo Bay shoreline, public access to open space such as via the Bay Trail, and the use of native vegetation in the urban environment such as for landscape buffers for sidewalk areas and street trees.

POLICY CC.2.2 Preserve natural resources within the built environment, including trees, marshes, creeks and hillsides.

GOAL CC.5 Enhance the quality of life in Pinole by acknowledging the cultural diversity and by promoting, preserving and sustaining the cultural and performing arts.

POLICY CC.5.1 Celebrate the city’s cultural diversity through public art, cultural centers and community events for the benefit and enjoyment of all residents.

POLICY CC.5.2 Develop programs and facilities that promote the cultural and performing arts in Pinole.

Growth Management Element
GOAL GM.1 Regional Planning. Support cooperative transportation, land use and public service planning in Contra Costa County.

POLICY GM.1.1 West Contra Costa County Planning Activities. Achieve efficient public service delivery by coordinating with affected jurisdictions and agencies concerning public and private developments.

GOAL GM.3 Efficient Transportation. Support land use patterns that make efficient use of the transportation system and enhance public safety.

POLICY GM.3.1 Transportation Management. Make more efficient use of the regional and subregional transportation system.

POLICY GM.3.3 Provide Adequate Transportation Facilities and Services. Provide adequate transportation facilities while maintaining neighborhood integrity.

POLICY GM.3.7 Mobility-Impaired. Support efforts to provide safe and convenient transportation systems for all citizens of Pinole, particularly mobility-impaired individuals.

GOAL GM.4 Compact Development and Service Areas. Encourage infill and redevelopment in areas that are already served by utilities, infrastructure and public services.

POLICY GM.4.1 Planning for Present and Future Community Needs. Plan for, provide and maintain a level of public infrastructure facilities and services that adequately serves the present and future needs of the community.

Land Use & Economic Development Element
GOAL LU.1 Preserve and enhance the natural resources, high-quality residential neighborhoods and commercial areas, and small-town (semi-rural) character of Pinole.

POLICY LU.1.3 Establish and implement a continuing program of civic beautification, gateway or entryway enhancement, tree planting, maintenance of homes and streets, and other measures which will promote an aesthetically desirable environment and attractive neighborhood areas.

GOAL LU.4 Preserve and strengthen the identity and quality of life of Pinole’s residential neighborhoods.

POLICY LU.4.1 Ensure all new development, renovation or remodeling preserves and strengthens Pinole’s residential neighborhoods by requiring projects to be harmoniously designed and integrated with the existing neighborhood.

GOAL LU.6 Protect and enhance the natural resources of the San Pablo Bay waterfront for the enjoyment of Pinole residents.

POLICY LU.6.3 Provide waterfront parks, pedestrian pathways and recreation areas that are safe, accessible, and attractive for public use.

Housing Element
GOAL H.2 Protect Existing Character and Heritage. Protect and enhance the integrity and distinctive character and heritage of Pinole encouraging the development of high quality, well-designed housing and conserving existing housing.

POLICY H.2.4 Maintain Existing Housing and Neighborhood Amenities. Maintain Pinole’s lifestyle characteristics by encouraging the maintenance of existing housing stock, and in particular housing with historic value, and preserving the amenities of existing neighborhoods.

GOAL H.3 Provide Adequate Services and Facilities. Provide adequate services and facilities to meet the needs of the city’s current and future population.

POLICY H.3.1 Plan For Public Facility and Services Needs. Future development shall be planned based on public facility and service capacity, community-wide needs, sound citywide and neighborhood planning and public improvement programming.

POLICY H.3.4 Encourage new pedestrian-oriented development. Encourage new development and redevelopment that places residences in close proximity to a variety of services and facilities.

Circulation Element
GOAL CE.1 Reduce vehicle miles traveled and encourage the use of public transit.

POLICY CE.1.1 Encourage strategic growth that concentrates future development along Pinole’s three primary transit corridors (San Pablo Avenue, Appian Way and Pinole Valley Road).

POLICY CE.1.3 Encourage development that is sensitive to both local and regional transit measures and that promotes the use of alternative modes of transportation.

POLICY CE.1.4 Encourage maximum utilization of the existing public transit system and alternate modes of transportation in Pinole.

GOAL CE.3 Provide timely input and effective means (as appropriate) of programming street and highway improvements to maintain the objective peak hour level of service without detrimentally impacting community character or commercial activity.

POLICY CE.3.2. Maintain roadway network at or above established LOS thresholds.

GOAL CE.4 Establish programs to support sidewalk, trail and street enhancements, where feasible.

POLICY CE.4.5 Inventory sidewalk conditions to identify opportunities for enhancements to the circulation system and to help prioritize repair and maintenance activities as funding becomes available.

GOAL CE.5 Provide adequate parking and loading facilities while encouraging alternative means of transportation.

GOAL CE.7 Support bicycle use as a mode of transportation by enhancing infrastructure to accommodate bicycle and rides.

POLICY CE.7.1 Enhance the City’s Bikeway network through the use of Class I, II, and III bikeways.

POLICY CE.7.3 Establish a network of multi-use paths to facilitate safe and direct off-street bicycle and pedestrian travel.

Page 367 of 374 ends

Community Services and Facilities Element
GOAL CS.1 Provide safe, attractive and efficiently designed infrastructure and sustainable facilities to serve the public.

POLICY CS.1.1 The City will strive to provide safe, attractive and efficiently designed facilities for public and quasi-public organizations.

POLICY CS.1.3 The City will endeavor to provide convenient access to community facilities and services to all areas of the community.

GOAL CS.2 Ensure and maintain a high level of public safety in the community.

POLICY CS.2.6 The City will continue to fund the repair, maintenance and expansion of facilities to respond to evolving service needs.

GOAL CS.3 Provide adequate and high-quality recreational opportunities and programs for the community.

POLICY CS.3.1 Continue to provide a variety of recreational opportunities that serve and represent all aspects of the community.

POLICY CS.3.3 Expand and organize a multi-use trail system.

GOAL CS.6 Provide adequate, economical and dependable wastewater collection service and treatment.

POLICY CS.6.1 The City shall continue to make capital improvements to the wastewater collection and treatment system to maintain system capability and reliability.

GOAL CS.7 Minimize flooding.

POLICY CS.7.1 The City will ensure that the storm drain system has adequate capacity to minimize street flooding and, where feasible, shall expand the capacity of the system to control storm flows.

GOAL CS.9 Provide economical and dependable community services while conserving energy resources.

POLICY CS.9.1 The City will seek opportunities to improve the energy efficiency of facilities and operations.

GOAL CS.10 Provide safe, efficient roadway infrastructure to support multiple modes of transportation and to meet existing and future circulation needs.

POLICY CS.10.2 The City will update, where possible, the existing roadway network to enhance pedestrian, bicycle and transit circulation while maintaining safe vehicular circulation.

Health and Safety Element
GOAL HS.1 Minimize the potential for loss of life, injury, damage to property, economic and social dislocation, and unusual public expense due to natural and man-made hazards GOAL HS.2 Protect the community from the risk of flood damage and improve surface water quality.

POLICY HS.2.4 Continue to monitor studies that identify anticipated changes in sea level and create appropriate standards and improvements to minimize flood risks.

POLICY HS.2.5 Establish appropriate capital improvements and management programs to reduce wet weather sewer treatment demand and avoid discharge to the shallow water outfall.

GOAL HS.3 Minimize hazards of soil erosion, weak and expansive soils, potentially hazardous soils materials, other hazardous materials, geologic instability and seismic activity.

POLICY HS.3.5 Require proper handling, storage, disposal and cleanup of hazardous materials to prevent leakage, potential explosions, fires or the escape of harmful gases and to prevent individually innocuous materials from combining to form hazardous substances, especially at the time of disposal.

GOAL HS.4 Ensure that government agencies, citizens and businesses are prepared for an effective response and recovery in the event of emergencies or disasters.

POLICY HS.4.1 Continue to provide essential emergency public services during natural catastrophes POLICY HS.4.3 Incorporate technological enhancements in new and substantially remodeled structures and facilities to support and improve emergency services.

GOAL HS.6 Support multiple forms of transportation and a circulation system design that reduces vehicle trips and emissions.

POLICY HS.6.1 Promote and encourage walking and bicycling as viable forms of transportation to services, shopping and employment.

GOAL HS.7 Ensure that all new development meets or exceeds state and federal water quality standards.

POLICY HS.7.1 Support Regional, state and federal clean water programs.

POLICY HS.7.3 Reduce the transport of runoff and surface pollutants.

POLICY HS.7.6 Establish appropriate capital improvements and management programs to reduce wet weather sewer treatment demand and avoid discharge to the shallow water outfall.

Natural Resources and Open Space Element
GOAL OS.1 Ensure the preservation of natural resources by determining appropriate land use and compatibility with natural resources and open space.

POLICY OS.1.2 Agency Cooperation. Work with Federal, State and local regulatory and trustee agencies to promote the long-term sustainability of local natural resources.

Sustainability Element
GOAL SE.3 The City will reduce its contribution to climate change and mitigate and adapt to the effects of climate change as appropriate.

POLICY SE.3.1 Reduce greenhouse gas emissions from City operations and community sources by a minimum of 15 percent below current or baseline levels by the year 2020.

POLICY SE.3.4 Reduce GHG emissions by reducing vehicle miles traveled and by increasing or encouraging the use of alternative fuels and transportation technologies.

POLICY SE.1.3 Enhance the energy efficiency of all City facilities.

GOAL SE.4 Optimize energy efficiency and renewable energy.

POLICY SE.4.2 Explore opportunities for City-wide expansion of Programs and Facilities related to energy efficiency and conservation.

GOAL SE.5 Achieve a solid waste diversion of 75% of the waste stream by 2020.

GOAL SE.7 Air quality will be maintained and improved for the City of Pinole and the Bay Area as a region and not decline below levels measured in early 1990’s.

POLICY SE 7.3 Support efforts to comprehensively address air quality issues through education, regulation, and innovation.

GOAL SE.8 Utilize transit options and reduce vehicle miles traveled and single-occupancy vehicle use.

POLICY SE.8.7 Work to improve Pinole’s pedestrian and bicycle infrastructure and to meet the needs of all pedestrians and bicyclists.

POLICY SE.8.10 Support and promote the use of low- and zero-emissions vehicles, alternative fuels, and other measures to directly reduce emissions from motor vehicles.

Page 368 of 374 ends

UNFUNDED PROJECTS
Project Information
Staff Recommendation
Streets & Roads
Sanitary Sewer
Stormwater
Cost Estimate:

Potential Funding Sources:

Priority Score: 11
Project Information
Staff Recommendation
Facilities
Cost Estimate:

Potential Funding Sources:

Priority Score: 32
Project Information
Council Request
Parks
Cost Estimate:

Potential Funding Sources:

Priority Score: 22
Project Information
Staff Recommendation
Parks
Cost Estimate:

Potential Funding Sources:

Priority Score: 25
UF001 - Railroad Avenue Bridge Removal and Replacement
The Contra Costa County Flood Control and Water
Conservation District has advised removal of the Railroad Avenue Bridge. The bridge is a flood barrier. The first step is to determine if the City of Pinole is the responsible agency for this project.
$ -
Project Origin:

Functional Area:

UF002
UF002 - Parking Lot Resurfacing
This project is to maintain and enhance existing City owned parking facilities and infrastructure, to increase parking supply, and to support ongoing multi-modal and streetscape
improvements. Improvements include saw cutting and
demolition, pavement removal, earthwork, pavement
installation, curb and gutter, striping, and signage.

Project Origin:

Functional Area:
$ -
UF003 - Eucalyptus Grove Restoration
The open space located between the Old Town area between John St. and Pinole Valley Road is forested with Eucalyptus trees. In 2014, a Safety Inspection was conducted by a
consultant. A total of 8 trees were recommended for removal, and root crown excavation was recommended for 3 trees. 2 trees were determined to be hollow and recommended for
further investigation to evaluate the level of internal decay. In 2018, the City hired a company to remove 20 Eucalyptus trees in the area. There are still many trees left and many of the prior trees were felled with the trunks remaining on site. This project will remove the remaining trees, both standing and, on the ground, and regreen this area with native trees.

Project Origin:

Functional Area:
- Repave Trails
The City’s goal is to develop safe, connected, and comfortable bicycle and pedestrian facilities for people of all ages and abilities. Repaving trails will enhance trail access from the City’s roadway network to encourage alternative modes of
transportation.

Project Origin:

Functional Area:
-
UF004
UF004
$ -
$ -

Page 369 of 374 ends

Project Information
Staff Recommendation
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 30
Project Information
Staff Recommendation
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 22
Project Information
Staff Recommendation
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 9
Project Information
Staff Recommendation
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 9
Shale Hill is located on San Pablo Ave. near Oak Ridge Road.

The cut slope above the pavement is comprised of shale which is loose and sloughs onto the road. There is no sidewalk in this area because the toe of the embankment is uncontrolled and there is inadequate space to accommodate a sidewalk. Staff has not been successful in securing grant funds for this project.

Project Origin:

Functional Area:
$ -
- Appian Complete Streets
This project will provide continuous sidewalks and bike lanes along Appian Way from San Pablo Dam Rd. in unincorporated El Sobrante to about 1500 lineal feet north of the city limit within the City of Pinole. The City received STMP funds from West Contra Costa Transportation Authority for preliminary design.

The construction phase remains unfunded.

Project Origin:

Functional Area:
$ -
UF005
- Pedestrian Bridge Maintenance
Maintenance of pedestrian bridges as identified in the
Pedestrian Bridge Inspection Reports completed by Quincy Engineering, Inc. In FY 2023/24.

Project Origin:

Functional Area:
$ -
UF006
- Shale Hill Retaining Wall and Sidewalk Gap
- I-80 / Pinole Valley Rd Interchange Improvements
This project will widen Pinole Valley Road ramp terminal intersections at I-80 to provide a dedicated right turn lane to the eastbound and westbound I-80 on ramps. This project will also provide crossing enhancements at the Pinole Valley Road and I80 intersection.

Project Origin:

Functional Area:
$ -
UF008
UF007
UF007

Page 370 of 374 ends

Project Information
Staff Recommendation
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 16
Project Information
Beautification Adhoc Committee
Infrastructure Assessment
Cost Estimate:

Potential Funding Sources:

Priority Score: 11
Project Information
Council Request
Facilities
Cost Estimate:

Potential Funding Sources:

Priority Score: 37
Project Information
General Plan
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 20
UF009 - Sidewalk Gaps
Project Origin:
$ -
This project will address sidewalk gaps by installing public sidewalks where sidewalks are missing on one or both sides of the street. This work will be coordinated with other construction projects. Sidewalk gaps often exist in places with site constraints (i.e. right of way, grade/slopes, or utility conflicts) or are adjacent to properties that have been required to provide sidewalks in the past due to land uses or ownerships. Locations for repair will be selected based on site conditions, pedestrian safety, and adjacent property attributes.

Functional Area:

UF011 - Installation of Solar at City Facilities
This project involves procurement and installation of solar panels at City owned facilities to offset the City’s electricity consumption and reduce the greenhouse gas impacts.

Project Origin:

Project Origin:

Functional Area:

Cal Fire Urban and Community Forestry Grant Program
$ -
UF010 - Tree Master Plan
In 2019, the City Council established a Beautification Ad Hoc Committee to analyze options for, and to make
recommendations to Council regarding clean-up and
beautification projects in Pinole. Among other projects, the Committee recommended the development of a Tree Master
Plan to inventory the existing trees, and to develop a plan for managing the tree inventory, including finding tree planting opportunities.

Project Origin:

Functional Area:
$ -
The General Plan, Chapter 8 discusses improvement of open space management to reduce wildfire risks. There is a desire to have improved, all-weather access roads through open space to improve access to and from Hercules and El Sobrante to
shorten response times and improve mutual aid.

Functional Area:

UF012 - All-Weather Access Roads
$ -

Page 371 of 374 ends

Project Information
LRSP
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 46
There is currently an annual signal upgrade project.

Project Information
LRSP
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 46
There is currently an annual signal upgrade project.

Project Information
LRSP
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 46
There are currently multiple safety improvement projects Project Information
LRSP
Streets & Roads
Cost Estimate:

Potential Funding Sources:

UF013 - Signalized Intersections
Project Origin:

Functional Area:

Highway Safety Improvement Program (HSIP)
UF015 - Safety at Unsignalized Intersections
$ -
Project Origin:

Functional Area:

Highway Safety Improvement Program (HSIP)
UF014 - Pedestrian Safety at Signalized Intersections
$ -
Installation of advance stop bars before crosswalk, raised median on approaches, raised pavement markers and striping through intersection at:
· Appian Way & Fitzgerald Dr
· San Pablo Ave & Tennent Ave
· Appian Way & Canyon Dr/Tara Hills
· Pinole Valley Rd/Tennent Ave/Ellerhorst St
· San Pablo Ave & Pinole Valley Rd
· Fitzgerald Dr and Best Buy Parking Lot
· Pinole Valley Rd & Estates Ave
Refer to the Local Road Safety Plan (LRSP) document for detailed recommendations.

Improvement to signal hardware, signal timing, or protected left turn phases at:
· Appian Way & Fitzgerald Dr
· San Pablo Ave & Tennent Ave
· Appian Way & Canyon Dr/Tara Hills
· Pinole Valley Rd/Tennent Ave/Ellerhorst St
· San Pablo Ave & Pinole Valley Rd
· San Pablo Ave & Pinon Ave/Appian Way
· Pinole Valley Rd & Estates Ave
Refer to the Local Road Safety Plan (LRSP) document for detailed recommendations.
- Roadway Segments # 1
Install segment lighting, or install/upgrade signs with new fluorescent sheeting, or install delineators, reflectors/object markers.
· Pinole Valley Rd: San Pablo Ave to Collins Ave
· San Pablo Ave: Oak Ridge Rd to Pinole Valley Rd
· San Pablo Ave: Golden Gate to Del Monte Dr
· Tara Hills: Kilkenny Way to Appian Way
· Walter Ave: North Terminus to San Pablo Ave
· Fitzgerald Dr: Jovita Ln to Appian Way
· Appian Way: San Pablo Ave to Michael Dr
· Tennent Ave: San Pablo Ave to Pinole Valley Rd
Refer to the Local Road Safety Plan (LRSP) document for detailed recommendations.

Project Origin:

Functional Area:

Highway Safety Improvement Program (HSIP)
$ -
Install intersection lighting, install/upgrade larger or additional stop signs or other intersection warning/regulatory signs, or install RRFB:
· Walter Ave & San Pablo Ave
· Pinole Valley Rd & Simas Ave
· Pinole Valley Rd & Wright Ave
· Pinole Valley Rd & Rafaela St
· Wright Ave & Carol St
· Simas Ave & Moraga Dr
Refer to the Local Road Safety Plan (LRSP) document for detailed recommendations.

Project Origin:

Functional Area:

Highway Safety Improvement Program (HSIP)
$ -
UF016

Page 372 of 374 ends

Priority Score: 46
Project Information
LRSP
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 46
Project Information
LRSP
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 46
Project Information
Caltrans Bridge Inspection
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 22
Project Information
Council Request
Streets & Roads
Cost Estimate:

Potential Funding Sources:

Priority Score: 58
Assess feasibility of and alternatives for, and design and construct traffic calming measures on San Pablo Avenue
between John St and Oak Ridge Rd. This project is within the limits of UF023 - San Pablo Avenue Complete Streets project and may partially or completely replace it.

Maintenance of vehicular bridges as identified in the Caltrans Bridge Inspection Reports. The latest bridge inspection issued in May 2023, contains recommendations for three bridges near:
· PVHS High School on Pinole Valley Rd
· Wright Ave on Pinole Valley Rd
· On Simas Ave near Pinole Valley Rd
$ 600,000
Project Origin:

Functional Area:

UF020 -

$ -
- Roadway Segments # 2
Install centerline rumble strips/stripes, or install edge-lines and centerlines, or install RRFB:
· Pinole Valley Rd: San Pablo Ave to Collins Ave
· San Pablo Ave: Oak Ridge Rd to Pinole Valley Rd
· San Pablo Ave: Golden Gate to Del Monte Dr
· Tara Hills: Kilkenny Way to Appian Way
· Walter Ave: North Terminus to San Pablo Ave
· Tennent Ave: San Pablo Ave to Pinole Valley Rd
Refer to the Local Road Safety Plan (LRSP) document for detailed recommendations.

Project Origin:

Functional Area:

UF018 - Roadway Segments # 3
$ -
Implement road diet, or install dynamic/variable speed warning signs, or install/upgrade pedestrian crossing:
· Pinole Valley Rd: San Pablo Ave to Collins Ave
· San Pablo Ave: Oak Ridge Rd to Pinole Valley Rd
· Tara Hills: Kilkenny Way to Appian Way
· Fitzgerald Dr: Jovita Ln to Appian Way
· Appian Way: San Pablo Ave to Michael Dr
Refer to the Local Road Safety Plan (LRSP) document for detailed recommendations.

Highway Safety Improvement Program (HSIP)
UF017
Highway Safety Improvement Program (HSIP)

UF019 - Vehicular Bridge Maintenance
Old Town Traffic Calming
$ -
Project Origin:

Functional Area:

Project Origin:

Functional Area:

Page 373 of 374 ends

Project Information
Assessment
Facilities
Cost Estimate:

Potential Funding Sources:

Priority Score: 57
Various upgrade projects were estabished
Project Information
Assessment
Sanitary Sewer
Cost Estimate:

Potential Funding Sources:

Priority Score: 59
Various initiates are being pursued
Project Information
Assessment
Facilities
Cost Estimate:

Potential Funding Sources:

Priority Score: 58
Project Information
Assessment
Parks
Cost Estimate:

Potential Funding Sources:

Priority Score: 62
Energy conservation measures recommended in the Energy
Conservation, Generation, and Storage Assessment.

Energy conservation measures recommended in the Energy
Conservation, Generation, and Storage Assessment.

Energy conservation measures recommended in the Energy
Conservation, Generation, and Storage Assessment.

Energy conservation measures recommended in the Energy
Conservation, Generation, and Storage Assessment.

UF021 - City Hall Energy Upgrades
$ -
UF024 -
Functional Area:

Self-Generation Incentive Program (SGIP)
UF023 - Youth Center Energy Upgrades
$ -
UF022 - WPCP Energy Upgrades
Project Origin:

Functional Area:
$ -
Project Origin:

Functional Area:

Project Origin:

Functional Area:

Park Energy Upgrades
$ -
Project Origin: