1 Form 79-1118
Advice 5104-G/7690-E
August 2025
CALIFORNIA STATE GOVERNMENT
CUSTOMERS ON-BILL FINANCING
LOAN AGREEMENT
The undersigned customer (“Customer”) has contracted for the provision of energy efficiency/demand response equipment and services (the “Work”) which qualify for one or more of PG&E’s applicable rebate or incentive programs. Subject to the conditions (including the process for Adjustment and preconditions to funding) set forth below, Pacific Gas and Electric Company (“PG&E”) shall extend a loan (the “Loan”) to Customer in the amount of the loan balance (the “Loan Balance”) pursuant to the terms of this On-Bill Financing Loan Agreement (“Loan Agreement”) and PG&E’s rate schedules E-OBF and/or G-OBF, as applicable (the “Schedule”).
To request the Loan, Customer has submitted a completed On-Bill Financing Application and associated documentation as required by PG&E (the “Application”). Collectively the Application and this Loan Agreement (including any Adjustment hereunder) comprise the “Agreement".
1. Customer shall arrange for its Contractor, as identified at the end of this Agreement (“Contractor”), to provide the Work as described in the Application.
2. The estimated Loan Balance is set forth below. The total cost of the Work as installed, rebate/incentive for qualifying energy efficiency measures, Loan Balance, monthly payment, and loan term specified in this Loan Agreement may be adjusted, if necessary, after the Work and the post-installation inspection described in the Application and/or herein are completed (the “Adjustment”). The Adjustment will be calculated using the actual total cost of the Work, as installed, and the estimated energy savings (as described in the Application) of such Work. In no event will the Loan Balance be increased without Customer’s written consent, even if Customer is eligible for such increased Loan Balance. Moreover, in no event will the Loan Balance exceed the maximum loan amount stipulated in the Application. Customer understands that in order to be eligible for the Loan, the initial Loan Balance for Work may not fall below the minimum loan amount, nor may the payback period exceed the maximum payback period. Accordingly, if after the Adjustment, the Loan Balance falls below the minimum loan amount or if the simple payback period exceeds the program maximum payback period, each as described in the Application, PG&E shall have no obligation to extend the Loan, as the Work would not meet program requirements. The Adjustment described in this paragraph will be communicated to the Customer in writing and will automatically become part of this Loan Agreement, except that any proposed increase in the Loan Balance will only become part of this Loan Agreement upon Customer’s written consent to such increase.
3. PG&E shall have no liability in connection with, and makes no warranties, expressed or implied, regarding the Work.
The Parties acknowledge and agree that PG&E is only providing the State with financing. The Customer has independently hired contractors ("State Contractors") to perform the work on behalf of the Customer to qualify for financing. The Customer acknowledges and agrees that the State Contractors are not third party beneficiaries to this agreement between the Customer and PG&E. To the extent authorized by law and subject to appropriation of the Legislature, the Customer agrees that it will look only to State Contractors for any claims related to the installed equipment or its performance and that PG&E shall have no responsibility or liability, except for the payment of the loan proceeds, and the Customer shall indemnify PG&E for any claims made by the State Contractors against PG&E.
4. Customer represents and warrants that (a) Customer is receiving this Loan solely for Work obtained in connection with Customer’s business, and not for personal, family or household purposes; (b) Customer, if not an individual or a government agency, is duly organized, validly existing and in good standing under the laws of its state of formation, and has full power and authority to enter into this Agreement and to carry out the provisions of this Agreement. Customer is duly qualified and in good standing to do business in all jurisdictions where such qualification is required; (c) this Loan Agreement has been duly authorized by all necessary proceedings, has been duly executed and delivered by Customer and is a valid and legally binding agreement of Customer duly enforceable in accordance with its terms; (d) no consent, approval, authorization, order, registration or qualification of or with any court or regulatory authority or other governmental body having jurisdiction over Customer is required for, and the absence of which would adversely affect, the legal and valid execution and delivery of this Loan Agreement, and the performance of the transactions contemplated by this Loan Agreement; (e) the execution and delivery of this Loan Agreement by Customer hereunder and the compliance by Customer with all provisions of this Loan Agreement: (i) will not conflict with or violate any Applicable Law; and (ii) will not conflict with or result in a breach of or default under any of the terms or provisions of any loan agreement or other contract or agreement under which Customer is an obligor or by which its property is bound; and (f) all factual information furnished by Customer to PG&E in the Application and pursuant to this Agreement is true and accurate.
5. The Application must include the Federal Tax Identification Number or Social Security Number of the party who will be the recipient of the checks for the rebate/incentive or any Loan proceeds. Checks may be issued directly to the Customer or its designated Contractor or both, for the benefit of the Customer, as specified below. Customer acknowledges that PG&E will not be responsible for any tax liability imposed on the Customer or its contractor in connection with the transactions contemplated under the Agreement, whether by virtue of the Loan contemplated under the Agreement, or otherwise, and Customer shall indemnify PG&E for any tax liability imposed upon PG&E as a result of the transactions contemplated under the Agreement.
2 Form 79-1118
Advice 5104-G/7690-E
August 2025
6. Upon completion of the Work, Customer shall send a written confirmation of completion to PG&E’s On-Bill Financing Program Administrator at the address listed in Section 15. Within 60 days after receiving the confirmation, PG&E (a) will conduct a post installation inspection and project verification, including review of invoices, receipts and other documents as required by PG&E to verify the correctness of any amounts claimed by Customer; and (b) will adjust, if necessary, the total cost, incentive, Loan Balance, monthly payment, and loan term as stated above. Customer shall give PG&E reasonable access to its premises and the Work. If the Work conforms to all requirements of the Agreement and all amounts claimed by Customer as Work costs are substantiated to PG&E’s reasonable satisfaction, PG&E will issue a check (“Check”) to Customer or Contractor (as designated by Customer in Section 15) for all amounts PG&E approves for payment in accordance with the Agreement. The date of such issuance is the “Issuance Date”. If the Check is issued to Customer, Customer shall be responsible for paying any outstanding fees due to Contractor for the Work. If the Check is less than the amount due from Customer to Contractor, Customer shall be responsible for the excess due to the Contractor.
7. Customer shall repay the Loan Balance to PG&E as provided in this Loan Agreement irrespective of whether or when the Work is completed, or whether the Work is in any way defective or deficient, and whether or not the Work delivers energy efficiency savings to Customer.
8. The monthly payments will be included by PG&E on the Account's regular energy service bills, or by separate bill, in PG&E’s discretion. Regardless whether the monthly payments are included in the regular utility bill or a separate loan installment bill, the following repayment terms will apply:
a. The Customer agrees to repay to PG&E the Loan Balance in the number of payments listed below and in equal installments (with the final installment adjusted to account for rounding), by the due date set forth in each PG&E utility bill or loan installment bill rendered in connection with Customer’s account (identified by the number set forth below) (“Account”), commencing with the bill which has a due date falling at least 30 days after the Issuance Date.
b. If separate energy service bills and loan installment bills are provided, amounts due under this Loan Agreement as shown in the loan installment bill shall be deemed to be amounts due under each energy services bill to the Account, and a default under this Loan Agreement shall be treated as a default under the Account.
c. If the Customer is unable to make a full utility bill payment in a given month, payment arrangements may be made at PG&E’s discretion.
d. Any partial bill payments received for a month will be applied in equal proportion to the energy charges and the loan obligation for that month, and the Customer may be considered in default of both the energy bill and the loan installment bill.
e. Further payment details are set forth below.
9. Any notice from PG&E to Customer regarding the Program or the transactions contemplated under the Loan Agreement may be provided within a PG&E utility bill or loan installment bill, and any such notices may also be provided to Customer at the address below or to the Customer’s billing address of record in PG&E’s customer billing system from time to time, and in each case shall be effective five (5) days after they have been mailed.
10. The Loan Balance shall not bear interest.
11. Customer may, without prepayment penalty, pay the entire outstanding loan balance in one lump sum payment provided the customer first notifies PG&E by telephoning the toll free phone number (1-800-468-4743), and by sending written notice to PG&E On-Bill Financing Program Administrator at the address listed below, in advance of making the lump sum payment. Accelerated payments that are received from Customer without PG&E’s prior approval may, at PG&E’s sole discretion, be applied proportionally to subsequent energy charges and Loan repayments and PG&E shall have no obligation to apply accelerated payments exclusively to reduction of the outstanding Loan.
12. The entire outstanding Loan Balance will become immediately due and payable, and shall be paid by Customer within 30 days if:
(i) the Account is closed or terminated for any reason; (ii) Customer defaults under the Agreement; (iii) Customer sells the equipment forming part of the Work to any third party; or (iv) Customer becomes Insolvent. Customer becomes “Insolvent” if: (i) Customer is unable to pay its debts as they become due or otherwise becomes insolvent, makes a general assignment for the benefit of its creditors, or suffers or permits the appointment of a receiver for its business or assets or otherwise ceases to conduct business in the normal course; or (ii) any proceeding is commenced by or against Customer under any bankruptcy or insolvency law that is not dismissed or stayed within 45 days.
13. Customer understands that without limiting any other remedy available to PG&E against Contractor or Customer, failure to repay the Loan Balance in accordance with the terms of the Agreement could result in shut-off of utility energy service, adverse credit reporting, and collection procedures, including, without limitation, legal action.
14. If there is any conflict among the documents comprising the Agreement, the following order of priority shall apply: 1. this Loan Agreement; 2. the Application; 3. any documents attached to the Application.
3 Form 79-1118
Advice 5104-G/7690-E
August 2025
15. STATE OF CALIFORNIA REQUIREMENT
a. All Payment Obligations Subject to Appropriation
The Customer acknowledges that the cost incurred pursuant to this Loan Agreement will be part of the monthly bill for electricity use. All payment obligations and the Work replacement obligations of the Customer under this Loan Agreement or any related agreement or application is subject to appropriation by the Legislature of the State of California.
b. No Lien or Encumbrance; Subordination:
(1) Notwithstanding any other provision in this Loan Agreement – , PG&E acknowledges that nothing in this Loan Agreement shall constitute a mortgage, charge, assignment, transfer, pledge, lien or encumbrance upon either the Work or any part of the buildings, structures or related facilities in which the Work is constructed, installed or situated (collectively, the “Related Facilities”). Accordingly, PG&E agrees it will not record or file any instrument that would indicate or imply it has a security interest in the Related Facilities, including but not limited to a UCC-1. (2) In addition to the preceding paragraph (a), if this Loan Agreement were ever construed or deemed to create any such encumbrance, then: (i) this Loan Agreement shall be junior and subordinate and subject in all respects to the terms and conditions of any and all leases, and indentures related to lease revenue bonds issued by the State Public Works Board of the State of California or any other issuer of bonds on behalf of the state concerning the Related Facilities entered into in the past, the present or the future (the “Senior Security Documents”); and (ii) any term or condition of this Loan Agreement relating to any right, title or interest in the Related Facilities or other benefits derived there from shall be in all respects junior and subordinate to, and subject to the terms of, the Senior Security Documents.
4 Form 79-1118
Advice 5104-G/7690-E
August 2025
16. Loan Particulars.
This table is to be completed by PG&E
Total Cost Incentive Customer
Buy- Down
(if applicable)
Loan Balance
1 Monthly
Payment
Term 2
(months)
Number of
Payments
$ 54,241.31 $ - $ - $ 54,241.31 $ 452.01 120 120
Check Made Payable to Customer □ or Contractor □
[customer to select payment method. Note that only one check can be issued]
17. This agreement at all times shall be subject to such modifications as the California Public Utilities Commission may direct from time to time in the exercise of its jurisdiction.
Federal Tax ID or Social Security #, Customer Federal Tax ID or Social Security #, Contractor 94-6000394 80-0196823
PG&E Account # / Service Agreement #
9840139961 / 9845996180
Account Name, Customer Name, Contractor
Primary Customer Name: CITY OF PINOLE - 2500
CHARLES ST
EcoGreen Solutions, Corey Brophy
Project ID: Population NMEC - 145927- Senior Center
FA ID: 016306
Customer Address (For OBF Check Delivery) Contractor Address (For OBF Check Delivery) 27671 La Paz Rd, Suite 100
Laguna Niguel CA 92677
Name and Title of Authorized Representative of
.Customer
Name and Title of Authorized Representative of
.Contractor
Corey Brophy, EcoGreen Solutions
Signature of Authorized Representative of Customer
Date
ACCEPTED: Pacific Gas and Electric Company
By Date
PG&E On-Bill Financing Authorized Representative
18. Once this Agreement is effective and unless otherwise agreed to by PG&E in writing, Customer must complete the approved project they are using these funds for, including submitting all post-installation documentation requirements, within 24 months thereafter. For avoidance of doubt, Customer will not be eligible and will not receive any funding under this Agreement, if their project is not fully completed within the 24 months or as otherwise expressly agreed by PG&E. 1 The Loan Balance shall not exceed two-hundred fifty thousand dollars ($250,000), except where, in PG&E’s sole opinion, the opportunity for uniquely large energy savings exist, in which case the Loan Balance may exceed two-hundred fifty thousand dollars ($250,000) but shall not exceed four million dollars ($4,000,000).
2 The loan term in months will be established by PG&E at the time of the OBF Loan Agreement initiation.
The maximum loan term shall be one hundred and twenty (120) months.
5 Form 79-1118
Advice 5104-G/7690-E
August 2025
On-Bill Financing Program (OBF)
Loan Calculation Summary Sheet
Simple project payback per meter
Customer Name: CITY OF PINOLE - 2500 CHARLES ST
Project Number: FA ID: 016306
Calculations from:
Original
(A)
PROJECT COST FOR
MEASURES
(B)
REBATES or INCENTIVES Customer Down
Payment or Buy-Down
CUSTOMER
TOTAL LOAN
AMOUNT
(C)
CUSTOMER
AVERAGE
RATE PER kWh
(D)
CUSTOMER
AVERAGE RATE
PER Therm
(E)
ESTIMATED
ANNUAL
ENERGY
SAVINGS
(kWh)
(F)
ESTIMATED
ANNUAL GAS
SAVINGS
(Therm)
ESTIMATED
ANNUAL ENERGY
COST SAVINGS
SIMPLE
PAYBACK IN
YEARS
$ 54,241.31 $ - $ - $ 54,241.31 $ 0.39 $ - 13,961.08 - $ 5,491.30 9.88
PAYBACK IN MONTHS
BASED ON EXPECTED
ENERGY SAVINGS
LOAN TERM (MONTHS)
(1 month added for bill
neutrality)
CUSTOMER FIXED
MONTHLY LOAN
PAYMENT
ESTIMATED
MONTHLY
ENERGY COST
SAVINGS
119 120 $ 452.01 $ 457.61
(C) = (From utility bill) Total $ amount (12-month) / Total kWh (same 12-month) (D) = (From utility bill) Total $ amount (12-month) / Total therm (same 12-month)
On Bill Financing - Energy Efficiency Measures
Energy Efficiency Measure: EC Motor Retrofit for Walk-in Cooler or Freezer This proposal recommends retrofitting legacy evaporator fan motors in existing walk-in coolers and freezers with high-efficiency electronically commutated (EC) motors to deliver persistent, around-the-clock electric savings and improved refrigeration performance. The statewide CPUC-approved measure SWCR004- 02 defines the base condition as shaded-pole (SHP) or permanent split-capacitor (PSC) evaporator fan motors and the retrofit as replacement with EC motors specifically for walk-ins, ensuring consistent eligibility, modeling, and documentation across programs.
Technically, EC motors are brushless permanent-magnet machines with integrated electronic control.
Compared with PSC induction motors used at the same fractional-horsepower sizes, ECs operate more efficiently across the load range and at set speeds typical of walk-in evaporators. The measure’s DOE-derived characterization at representative walk-in sizes shows SHP efficiency about 22–25%, PSC about 48–53%, and EC about 74–76%, with corresponding power-input ratios relative to SHP that translate to roughly one-third lower fan watts for EC versus PSC at equal duty points. These values are applied in the modeling by scaling fan power per cfm from an SHP baseline to PSC and EC cases using motor-efficiency ratios as a function of size.
Savings accrue through two channels. First, EC motors cut the electrical input to the fan itself. Second, because high-efficiency motors have lower internal (heat) losses, they add less heat to the refrigerated space, so the compressor removes a smaller load. The measure explicitly describes this dual effect for walk-ins: ECs reduce evaporator fan energy and the internal cooling load required by the case, with efficient operation over a wide speed range when adjustments are used.
The regulatory context strengthens the case for retrofit. California’s Appliance Efficiency Regulations (Title 20) require that newly manufactured walk-ins use EC or three-phase evaporator fan motors when the motor is under 1 hp and below 460 V, making EC motors the de-facto standard for new equipment. The statewide measure is therefore “to-code” for the measure case, aligning retrofits on older boxes with current code practice.
Modeling and impacts are developed with DOE-2.2R/DEER grocery prototypes, using motor-efficiency-based power scaling to compute unit energy consumption and savings. Average demand and peak reductions are calculated using California’s 4:00–9:00 p.m. peak window; in the walk-in prototypes the assumed motor counts are eleven per freezer and seven per cooler, so the per-motor peak impact comes from the difference between baseline and measure peak kW divided by the total number of motors. Gas effects are negligible.
Programmatically, the measure applies to fractional-hp evaporator fan motors with typical shaft outputs between 6 W and 373 W (approximately 1/125 to 1/2 hp) across all California climate zones and a wide range of commercial building types that host refrigerated storage. Eligibility is limited to older installations, with explicit exclusions for motors larger than 1/2 hp and for projects that stack this retrofit with separate evaporator fan controller measures. Projects require pre-inspection and a complete preponderance-of-evidence package, including customer/site information, building vintage, verification that baseline fans and blades are operating, and full nameplate data (baseline and EC replacements).
The measure adopts a 15-year Effective Useful Life for high-efficiency evaporator fan motors, with Remaining Useful Life for accelerated replacements set per CPUC policy at one-third of EUL unless better age data are available. These lifetime assumptions, combined with 24/7 operation and the dual savings mechanism, underpin strong, durable electric savings and credible demand reductions from a ubiquitous end-use.
In sum, replacing PSC (and SHP) evaporator fan motors with EC motors in walk-in coolers and freezers is a mature, code-aligned measure that simultaneously lowers fan energy and compressor load, yields coincident-peak benefits during 4–9 p.m., and is supported by standardized modeling and documentation requirements—making it a reliable, scalable pathway to reduce refrigeration energy costs while maintaining stable product temperatures.
During the on-site visit, it was noted that there is a total of three walk-in cooler units at The Senior Center.
The walk-in cooler assemblies are as follows:
LRC Coil Co #1 Assembly
o 2-fan unit, 16W, Screw Shaft, used for walk-in cooler #1 LRC Coil Co #2 Assembly
o 2-fan unit, 16W, Screw shaft; used for walk-in cooler #2 Heatcraft (BOHN) Assembly
o 2-fan unit, 1/15 hp, Solid shaft, used for walk-in cooler #3 Figure 1.15 shows that replacing shaded-pole (SHP) or permanent split-capacitor (PSC) evaporator fan motors with EC motors cuts fan input power and reduces internal heat added to the box, lowering compressor load. Using CPUC measure S¥CR004-02 values for typical sizes (freezer 1/40 hp, cooler 1/20 hp), ECs reduce fan W/cfm by ~36% vs PSC in freezers and ~30% in coolers-about~70% vs SHP. These fans rum 24/7, so the watt reduction maps directly to annual kwh savings and coincident peak demand benefits.
EcoGreen Solutions proposes installing four new screw-shaft GreenWize EC motors with two solid-shaft GreenWize motors along with three controllers to replace the existing evaporative motors. GreenWize’s fully variable motors and controllers work in sync to optimize motor efficiencies and evaporator coil operation to achieve the desired energy savings.
Figure 1.6. Comparison of Fan power per airflow and Percent savings between PSC, SHP and EC motors based on data from SWCR004-02 Measure.
On Bill Financing - Energy Efficiency Measures
Energy Efficiency Measure: LED Lighting
In the face of rising energy costs and growing environmental concerns, lighƟng efficiency has become a criƟcal target for energy-saving iniƟaƟves. Among available technologies, LED (Light Emiƫng Diode) lighƟng stands out as the most efficient, durable, and cost-effecƟve soluƟon. Replacing convenƟonal lighƟng such as incandescent, halogen, fluorescent, and CFL bulbs with LED systems can drasƟcally reduce power consumpƟon and operaƟonal costs, making it a top priority in both commercial and residenƟal retrofits.
Figure 1.7. A comparison of lighƟng efficiency between different lighƟng opƟons LED fixtures and bulbs significantly outperform tradiƟonal lighƟng in efficacy, lifespan, and operaƟng costs.
As shown in Figure 1.16, LED fixtures can achieve up to 140 lumens per waƩ, far surpassing CFLs (60 lm/W) and incandescents (15 lm/W). AddiƟonally, the lifespan of LED fixtures extends up to 50,000 hours, reducing maintenance and replacement costs dramaƟcally, as illustrated in Figure 1.7. This longevity translates to fewer disrupƟons in commercial seƫngs and reduced environmental waste.
Figure 1.8. LighƟng lifespan comparison for different lighƟng opƟons Financially, LEDs also lead in annual operaƟonal costs, with LED systems cosƟng less than $12/year per unit in typical use, compared to $60/year for incandescents and $45/year for halogens, as shown in Figure 1.8.
This cost difference grows substanƟally when scaled across faciliƟes with hundreds or thousands of fixtures.
Figure 1.9. EsƟmated annual operaƟng cost comparison for different lighƟng opƟons A phased replacement strategy is recommended, beginning with high-usage zones and aging lighƟng systems. For new builds, integrated LED fixtures offer the highest performance and ROI. For retrofit applicaƟons, LED bulbs serve as plug-and-play soluƟons in standard sockets, providing immediate savings.
UƟlity rebates and incenƟve programs (e.g., PG&E's lighƟng rebate programs) can also significantly offset iniƟal capital expenditures.
TransiƟoning to LED lighƟng is not merely a sustainability upgrade, it is a financially sound decision that aligns with long-term energy conservaƟon goals. The superior performance metrics and cost advantages posiƟon LEDs as the cornerstone of any modern energy strategy. Stakeholders are encouraged to iniƟate audits and acƟon plans to capitalize on these benefits immediately.
EcoGreen SoluƟons proposes that all old lighƟng systems at all thirteen sites be replaced with new LED fixtures or lamps.
On Bill Financing - Energy Efficiency Measures
Energy Efficiency Measure: Heat Pump Water Heater
Heat pump water heaters (HPWHs) represent one of the most advanced and energy-efficient soluƟons available for modern water heaƟng. Unlike tradiƟonal electric-resistance water heaters that generate heat directly from electricity, HPWHs use a refrigeraƟon cycle to transfer heat from the surrounding air into the water tank. This approach dramaƟcally improves efficiency, reducing energy consumpƟon and operaƟng costs.
A HPWH operates using several core components: an evaporator coil, a condenser coil, a compressor, a fan, and a sealed refrigerant loop. During operaƟon, the fan draws air across the evaporator coil, allowing the refrigerant inside the coil to absorb heat from the surrounding environment. As the refrigerant warms, it evaporates and is then compressed by the compressor, which significantly increases its temperature. The hot refrigerant gas is then routed through the condenser coil located in direct contact with the water tank. As it cools and condenses back into a liquid, it releases heat into the water. This process conƟnues unƟl the tank reaches the desired temperature.
Because HPWHs move heat rather than create it, they can achieve efficiency levels two to four Ɵmes higher than tradiƟonal resistance heaters. Modern models commonly achieve Uniform Energy Factor (UEF) raƟngs above 3.0, compared to approximately 0.92 for standard electric storage water heaters. The UEF metric is based on a standardized 24-hour simulated-use test that accounts for hot water draw paƩerns and ensures reliable comparisons across different heater types.
Many HPWHs are designed as hybrid systems that integrate both heat pump technology and electric resistance elements. The resistance elements operate only when necessary, such as during unusually high hot water demand or low ambient temperatures. Proper installaƟon ensures that the heat pump mode remains the primary heaƟng source, maximizing efficiency and prevenƟng unnecessary reliance on resistance heaƟng.
Retrofit installaƟon of HPWHs requires some planning. Many water heater replacements occur only aŌer equipment failure, which can lead to quick decisions that prioriƟze cost and convenience over efficiency.
HPWHs may also have different recovery characterisƟcs than resistance heaters, someƟmes requiring upsizing of tank capacity or the use of mixing valves to ensure adequate first-hour raƟng (FHR). These adjustments help maintain consistent hot water performance in homes and commercial buildings.
Ambient condiƟons also play an important role in HPWH performance. Because they extract heat from surrounding air, they operate best in locaƟons with moderate temperatures such as garages, basements, mechanical rooms, or uƟlity spaces. During operaƟon, HPWHs slightly cool and dehumidify the surrounding air. While this can be beneficial in warm climates, colder regions may require careful placement or ducƟng to maintain opƟmal performance.
HPWH technology aligns with modern building efficiency and decarbonizaƟon goals. Their ability to serve as
thermal storage devices allows them to heat water during off-peak hours, reducing demand on the electrical grid during high-load periods. This makes them valuable not only for individual energy savings but also for overall grid stability and renewable energy integraƟon.
When comparing energy use, the advantages of HPWHs are clear. Standard electric water heaters typically consume close to 4,900 kWh per year, while high-efficiency electric tanks reduce this slightly to around 4,600 kWh. HPWHs, however, use just over 2,100 kWh annually under similar condiƟons—reducing energy consumpƟon by more than half. These significant reducƟons lead to meaningful cost savings and lower environmental impact throughout the lifespan of the system.
In summary, heat pump water heaters represent a major technological advancement in water heaƟng. Their highly efficient heat-transfer process, superior performance metrics, compaƟbility with modern building standards, and long-term cost effecƟveness make them an essenƟal component of energy-efficient and low-carbon buildings. Whether in residenƟal or commercial applicaƟons, HPWHs provide reliable hot water while dramaƟcally reducing energy consumpƟon and supporƟng sustainability goals.
Figure 1.10. Annual electricity use comparison of electric storage water heaters and heat pump water heaters
Utility Bill Analysis
Energy Consumption and Utility Cost Analysis
The summary of energy consumpƟon and corresponding costs at the City of Pinole for a twelve-month period are shown below:
1. Parking Lot – Pinole Farmers Market
Table 1.3. City of Pinole – Pinole Farmers Market Parking Lot, 798 Fernandez Ave, Pinole, CA 94564 The total uƟlity cost for this site is $1,967.47 and the combined electricity usage is 4,377 kWh resulƟng in a cost of $0.45/kWh.
2. Parking Lot – Beauty & Grace Salon
Table 1.4. City of Pinole – Beauty & Grace Salon Parking Lot, 647 Tennent Ave, Pinole, CA 94564.
The total uƟlity cost for this site is $1,051.8 and the combined electricity usage is 2,214 kWh resulƟng in a cost of $0.48/kWh.
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 16 56 203 0 275 0 0 0 0 0 $125.72
September-24 36 61 233 0 330 0 0 0 0 0 $151.08
October-24 70 45 279 0 394 0 0 0 0 0 $177.24
November-24 93 0 324 0 417 0 0 0 0 0 $180.99
December-24 144 0 338 0 482 0 0 0 0 0 $209.04
January-25 145 0 364 0 509 0 0 0 0 0 $220.89
February-25 114 0 311 0 425 0 0 0 0 0 $187.89
March-25 90 0 281 0 372 0 0 0 0 0 $167.09
April-25 46 0 263 0 309 0 0 0 0 0 $140.73
May-25 36 0 251 0 287 0 0 0 0 0 $131.36
June-25 28 14 255 0 298 0 0 0 0 0 $138.73
July-25 21 55 203 0 279 0 0 0 0 0 $136.71
Total 839 231 3,305 0 4,377 0 0 0 0 0 $1,967.47
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 9 33 124 0 167 0 0 0 0 0 $79.88
September-24 21 36 142 0 199 0 0 0 0 0 $95.36
October-24 31 24 147 0 202 0 0 0 0 0 $95.44
November-24 45 0 175 0 220 0 0 0 0 0 $99.85
December-24 75 0 187 0 262 0 0 0 0 0 $118.49
January-25 73 0 191 0 264 0 0 0 0 0 $119.39
February-25 52 0 152 0 204 0 0 0 0 0 $94.94
March-25 44 0 149 0 193 0 0 0 0 0 $91.94
April-25 19 0 134 0 153 0 0 0 0 0 $74.63
May-25 13 0 125 0 138 0 0 0 0 0 $68.15
June-25 6 6 100 0 112 0 0 0 0 0 $58.45
July-25 3 22 76 0 100 0 0 0 0 0 $55.28
Total 391 121 1,702 0 2,214 0 0 0 0 0 $1,051.80
3. Parking Lot – Guillermo Recoder - Pending
Table 1.5. City of Pinole – Guillermo Recoder Parking Lot, 2548 San Pablo Ave, Pinole, CA 94564
PENDING
4. Parking Lot- La Casita Bilingue Montessori - Pending Table 1.6. City of Pinole – La Casita Bilingue Montessori School Parking Lot, 592 Tennent Ave, Pinole, CA 94564
PENDING
5. Parking Lot- Sue’s Place - Pending
Table 1.7. City of Pinole – Sue’s Place Parking Lot, 2265 Pear St, Pinole, CA 94564
PENDING
6. Parking Lot- Old Town Public Parking Lot 1 - Pending Table 1.8. City of Pinole – Old Town Public Parking Lot, 2180 Prune St, Pinole, CA 94564
PENDING
7. Parking Lot- Old Town Public Parking Lot 2 - Pending Table 1.9. City of Pinole – Old Town Public Parking Lot 2, 2401 San Pablo Ave, Pinole, CA 94564 The total uƟlity cost for this site is $1,512.75 and the combined electricity usage is 3,294 kWh resulƟng in a cost of $0.46/kWh.
8. Parking Lot- 612 Tennent Ave - Pending
Table 1.10. City of Pinole – 612 Tennent Ave Parking Lot, 612 Tennent Ave, Pinole, CA 94564
PENDING
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak Total Usage Max. Max Demand On Peak Partial Peak Off Peak Super Off Peak Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 12 49 198 0 259 0 0 0 0 0 $118.63
September- 18 52 193 0 263 0 0 0 0 0 $121.89
October-24 53 38 188 0 279 0 0 0 0 0 $128.89
November- 66 0 227 0 293 0 0 0 0 0 $129.89
December-24 111 0 251 0 362 0 0 0 0 0 $159.63
January-25 104 0 237 0 341 0 0 0 0 0 $151.55
February-25 87 0 195 0 282 0 0 0 0 0 $127.94
March-25 80 0 212 0 291 0 0 0 0 0 $133.38
April-25 34 0 190 0 224 0 0 0 0 0 $104.50
May-25 28 0 188 0 216 0 0 0 0 0 $101.19
June-25 32 12 204 0 248 0 0 0 0 0 $117.64
July-25 26 45 165 0 236 0 0 0 0 0 $117.62
Total 651 196 2,448 0 3,294 0 0 0 0 0 $1,512.75
9. City Hall, Fire StaƟon 73 & Police Department
Table 1.11. City of Pinole – City Hall, Fire SaƟon 73 & Police Department, 2131 Pear St & 880 Tennent Ave, Pinole, CA 94564
The total uƟlity cost for this site is $216,120.79 and the combined electricity usage is 624,654 kWh resulƟng in a cost of $0.345/kWh.
Note: There are 2 meters located at this site and Table 1.11 is generated based of data from both meters.
10. Fernandez Park
Table 1.12. City of Pinole – Fernandez Park, 595 Tennent Ave, Pinole, CA 94564 The total uƟlity cost for this site is $4,107.45 and the combined electricity usage is 9,839 kWh resulƟng in a cost of $0.42/kWh.
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 15,838 12,381 38,354 0 66,573 172 168 167 156 0 $24,047.93 September-24 14,302 11,139 33,546 0 58,987 161 161 154 134 0 $21,555.95 October-24 13,089 5,320 37,200 0 55,609 160 160 146 158 0 $19,682.49 November-24 10,487 0 37,364 0 47,851 124 115 0 124 0 $16,194.11 December-24 10,172 0 36,949 0 47,120 106 100 0 106 0 $15,641.71 January-25 9,831 0 36,098 0 45,928 101 97 0 101 0 $15,103.12 February-25 10,237 0 37,196 0 47,433 103 98 0 103 0 $15,490.62 March-25 9,993 0 30,831 5,532 46,355 110 107 0 108 104 $15,228.73 April-25 10,197 0 25,256 11,190 46,643 130 126 0 129 126 $15,710.20 May-25 11,471 0 27,400 12,425 51,295 138 136 0 129 122 $17,096.88 June-25 12,941 4,513 30,995 8,258 56,708 149 144 133 149 127 $19,839.81 July-25 12,192 9,745 32,216 0 54,152 149 140 147 134 0 $20,529.24 Total 140,750 43,098 403,405 37,405 624,654 1,603 1,552 747 1,531 479 $216,120.79 On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] April-24 107 0 661 1 769 0 0 0 0 0 $324.10
May-24 72 0 577 0 649 0 0 0 0 0 $276.81
June-24 111 36 548 0 696 0 0 0 0 0 $302.64
July-24 36 125 453 0 615 0 0 0 0 0 $277.27
August-24 47 120 446 0 613 0 0 0 0 0 $269.16
September-24 91 130 514 0 735 0 0 0 0 0 $324.48
October-24 125 85 527 0 736 0 0 0 0 0 $322.68
November-24 180 0 634 0 814 0 0 0 0 0 $344.28
December-24 294 0 704 0 997 0 0 0 0 0 $421.70
January-25 315 0 763 0 1,078 0 0 0 0 0 $456.69
February-25 245 0 953 0 1,197 0 0 0 0 0 $510.82
March-25 262 0 677 1 940 0 0 0 0 0 $276.82
Total 1,885 496 7,457 2 9,839 0 0 0 0 0 $4,107.45
11. Youth Center & Playhouse
Table 1.13. City of Pinole – Youth Center & Playhouse, 635 Tennent Ave, Pinole, CA 94564 The total uƟlity cost for this site is $16,468.65 and the combined electricity usage is 39,671 kWh resulƟng in a cost of $0.415/kWh.
Note: There are 3 meters located at this site and Table 1.13 was generated based on data from all three meters.
12. Tiny Tots & Swim Center
Table 1.14. City of Pinole – Tiny Tots & Swim Center, 2454 Simas Ave, Pinole, CA 94564 The total uƟlity cost for this site is $5,481.75 and the combined electricity usage is 22,722 kWh resulƟng in a cost of $0.24/kWh.
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 405 769 2,214 0 3,389 27 0 0 0 0 $693.06
September-24 -139 663 2,499 0 3,022 30 0 0 0 0 $738.25
October-24 638 1,277 3,059 0 4,974 34 0 0 0 0 $997.25
November-24 87 444 2,492 0 3,023 24 0 0 0 0 $645.49
December-24 1,606 0 2,900 0 4,505 17 0 0 0 0 $9,235.16
January-25 1,575 0 2,966 0 4,539 20 0 0 0 0 $799.93
February-25 1,591 0 2,782 0 4,374 22 0 0 0 0 $807.75
March-25 1,636 0 2,615 -169 4,083 21 0 0 0 0 $708.56
April-25 952 0 1,914 -695 2,172 21 0 0 0 0 $452.98
May-25 914 0 1,724 -830 1,810 15 0 0 0 0 $388.81
June-25 1,223 18 1,598 -1,063 1,776 21 0 0 0 0 $464.79
July-25 994 51 960 0 2,004 21 0 0 0 0 $536.62
Total 11,482 3,222 27,723 -2,757 39,671 273 0 0 0 0 $16,468.65 On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 -1,668 -85 1,943 0 190 20 0 0 0 0 $23.82
September-24 -1,553 -6 1,963 0 404 11 0 0 0 0 $24.64
October-24 -979 374 2,451 0 1,846 11 0 0 0 0 $44.59
November-24 -378 534 2,875 0 3,031 12 0 0 0 0 $456.48
December-24 1,435 0 3,029 0 4,464 11 0 0 0 0 $608.08
January-25 1,445 0 3,713 0 5,158 12 0 0 0 0 $2,744.29
February-25 1,358 0 3,045 0 4,403 12 0 0 0 0 $596.30
March-25 1,199 0 2,195 -270 3,124 12 0 0 0 0 $448.95
April-25 667 0 2,630 -1,464 1,833 16 0 0 0 0 $317.42
May-25 313 0 2,054 -1,783 584 17 0 0 0 0 $165.43
June-25 -81 0 1,075 -2,157 -1,163 12 0 0 0 0 $24.65
July-25 -189 0 -913 0 -1,102 17 0 0 0 0 $27.10
Total 1,569 817 26,060 -5,674 22,772 163 0 0 0 0 $5,481.75
13. Senior Center
Table 1.15. City of Pinole – Senior Center, 2500 Charles Ave, Pinole, CA 94564 The total uƟlity cost for this site is $57,156.2 and the combined electricity usage is 145,314 kWh resulƟng in a cost of $0.39/kWh.
14. Fire StaƟon 74
Table 1.16. City of Pinole – Fire StaƟon 74, 3700 Pinole Valley Rd, Pinole, CA 94564 The total uƟlity cost for this site is $15,779.54 and the combined electricity usage is 32,681 kWh resulƟng in a cost of $0.48/kWh.
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 4,778 3,773 10,821 0 19,372 66 49 57 66 0 $7,506.95 September-24 4,073 3,254 9,078 0 16,405 62 45 50 62 0 $6,514.70 October-24 3,806 1,255 11,426 0 16,488 61 46 46 61 0 $6,212.55 November-24 2,858 0 10,232 0 13,090 46 37 0 46 0 $4,859.38 December-24 1,916 0 8,229 0 10,145 34 20 0 34 0 $3,797.58 January-25 1,811 0 7,205 0 9,016 36 20 0 36 0 $3,463.29 February-25 2,256 0 9,619 0 11,875 39 32 0 39 0 $4,370.27 March-25 1,800 0 5,930 1,722 9,452 41 21 0 41 40 $3,709.31 April-25 1,694 0 4,429 2,177 8,300 39 23 0 28 39 $3,365.46 May-25 1,708 0 4,766 2,920 9,395 45 33 0 44 45 $3,793.93 June-25 1,745 1,135 5,863 1,763 10,506 53 37 35 52 53 $4,508.73 July-25 2,153 2,176 6,942 0 11,270 57 43 47 57 0 $5,054.05 Total 30,598 11,593 94,540 8,582 145,314 579 406 235 566 177 $57,156.20 On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] August-24 1,155 837 2,006 0 3,997 11 11 10 9 0 $1,776.51 September-24 1,027 722 1,633 0 3,381 11 11 10 10 0 $1,581.44 October-24 904 584 1,565 0 3,052 11 11 10 10 0 $1,468.71 October-24 737 0 1,952 0 2,690 10 10 0 10 0 $1,282.73
December-24 567 0 1,807 0 2,374 6 6 0 5 0 $1,149.38
January-25 538 0 1,713 0 2,251 6 5 0 6 0 $1,074.73
February-25 535 0 1,781 0 2,316 6 6 0 5 0 $1,111.63
March-25 489 0 1,672 49 2,210 6 6 0 6 4 $1,071.52
April-25 477 0 1,255 407 2,139 8 8 0 7 8 $1,086.93
May-25 624 0 1,279 400 2,302 9 9 0 8 7 $1,170.44
June-25 865 35 1,553 491 2,944 10 10 7 9 9 $1,406.97
July-25 899 638 1,488 0 3,025 13 13 10 11 0 $1,598.55
Total 8,817 2,816 19,704 1,347 32,681 107 106 47 96 28 $15,779.54
15. WWTP
Table 1.17. City of Pinole – City of Pinole – WWTP, 11 Tennent Ave, Pinole, CA 94564.
The total uƟlity cost for this site is $559,860.69 and the combined electricity usage is 2,639,311 kWh resulƟng in a cost of $0.21/kWh.
On Peak Partial
Peak
Off Peak
Usage
Super Off
Peak
Total
Usage
Max. Max
Demand On Peak Partial Peak Off Peak Super Off Peak
Total Bill
Amount
[kWh] [kWh] [kWh] [kWh] [kWh] [kW] [kW] [kW] [kW] [kW] [$] April-24 54,117 0 139,648 53,703 247,468 474 474 0 472 397 $43,513.83 May-24 48,671 0 126,859 49,292 224,822 589 448 0 509 589 $43,971.30 June-24 50,160 26,995 136,113 17,996 231,264 450 443 438 450 370 $44,316.00 July-24 54,295 44,596 142,768 0 241,659 446 442 442 446 0 $45,856.71 August-24 56,922 46,851 150,975 0 254,747 523 504 523 469 0 $48,558.68 September-24 53,493 44,250 138,108 0 235,851 502 458 470 502 0 $45,223.83 October-24 49,004 17,228 153,178 0 219,409 442 426 442 438 0 $40,731.07 November-24 52,632 0 179,188 0 231,821 448 448 0 446 0 $41,459.79 December-24 39,289 0 135,166 0 174,455 704 704 0 682 0 $35,906.97 December-24 15,627 0 53,096 0 68,723 600 456 0 600 0 $19,191.21 January-25 53,592 0 182,654 0 236,246 512 512 0 512 0 $62,880.43 February-25 60,730 0 212,116 0 272,846 920 920 0 906 0 $88,250.87 Total 588,532 179,920 1,749,869 120,991 2,639,311 6,610 6,235 2,315 6,432 1,356 $559,860.69
Phase 2: Energy as a Service
Summarized Energy Action Plan
Table 2.1. Summary of Energy as a Service measures recommended for The City of Pinole2 Location Energy Efficiency Measure
Electricity Usage
Savings Cost Savings Preliminary Estimated Implementation Cost Payback Period [kWh/yr] [$/yr] [$] [yrs]
Parking Lot - Guillermo Recoder Upgrade exsisting lighting with LED lighting 515.00 $159.79 $2,439.17 Pending Parking Lot - La Casita Bilingue Montessori School Upgrade exsisting lighting with LED lighting 1,594.49 $494.29 $2,758.25 Pending Parking Lot - Sue's Place Upgrade exsisting lighting with LED lighting 531.50 $164.77 $2,773.59 Pending Parkign Lot - Old Town Public Parking Upgrade exsisting lighting with LED lighting 7,972.47 $2,471.47 $4,150.56 Pending Parking Lot - 612 Tennent Ave Upgrade exsisting lighting with LED lighting 1,063.00 $329.53 $1,567.66 Pending City Hall, Fire Station 73, Police Department & Post
Office
Roof Replacement - City Hall - - Blended Pending
Roof Replacement - Fire Station 73 - - Blended Pending
Solar & BESS - City Hall 179,155.00 $89,268.00 $1,156,011.80 Pending Solar & BESS - Fire Station 73 215,039.00 $154,819.00 $1,288,653.00 Pending Roof Replacement - Post Office3- - $172,800.00 Pending
Solar & BESS - Post Office TBD TBD TBD Pending
Youth Center & Playhouse
HVAC Replacement - Youth Center - - $116,580.60 Pending Upgrade exsisting lighting with LED lighting 11,987.00 $4,912.95 $45,306.23 Pending Tiny Tots & Swim Center
Roof Replacement - - Blended Pending
Upgrade exsisting lighting with LED lighting 14,165.00 $3,409.86 $27,076.20 Pending BESS - $7,181.00 $185,000.00 Pending
Senior Center Solar & BESS 144,119.00 $56,452.00 $753,465.00 Pending WWTP
Roof Replacement4- - $171,600.00 Pending
Solar & Bess TBD TBD TBD Pending
Fire Station 74
HVAC Replacement - - $29,145.15 Pending
Upgrade exsisting lighting with LED lighting 1,789.00 $863.90 $11,867.10 Pending Roof Replacement - - Blended Pending
Solar & BESS 40,563.00 $13,063.00 $420,200.00 Pending
Fernandez Park Upgrade exsisting lighting with LED lighting 5,583.00 $2,320.72 $149,963.26 Pending Total 624,076.46 $335,910.28 $4,196,957.57 Pending
2 Please note that Solar & BESS pricing listed on this table is not considering incentives and rebates. 3 Please note that for Post OƯice and WWTP, roof replacement and Solar & BESS are not currently considered in the Energy as a Service scope as the customer has not requested Solar & BESS at these locations. We will need the utility bills for both locations to analyze and propose a Solar & BESS solution. After that, Roof Replacement can be covered through Energy as a Service. 4 Please note that for Post OƯice and WWTP, roof replacement and Solar & BESS are not currently considered in the Energy as a Service scope as the customer has not requested Solar & BESS at these locations. We will need the utility bills for both locations to analyze and propose a Solar & BESS solution. After that, Roof Replacement can be covered through Energy as a Service.
Project Scope of Work
EcoGreen will enhance the energy efficiency of multiple buildings and sites for The City of Pinole:
Parking Lot – Guillermo Recoder
Parking Lot – La Casita Bilingue Montessori School
Parking Lot – Sue’s Place
Parking Lot – Old Town Public Parking Lot 1
Parking Lot – 612 Tennent Ave
City Hall, Fire Sation 73, Post Office & Police Department Fernandez Park
Youth Center & Playhouse
Tiny Tots & Swim Center
Senior Center
Waste Water Treatment Plant
Fire Station 74
The project includes a comprehensive set of upgrades across multiple City facilities, designed to improve energy efficiency, reduce operating costs, and enhance long-term building performance. Planned improvements include installing high-efficiency LED lighting systems, integrating solar photovoltaic arrays paired with battery energy storage, replacing aging HVAC equipment with modern high-efficiency units, and completing roof replacements to support structural integrity and optimized energy performance. Work will begin with detailed site assessments at each location, followed by the installation of all new systems and components. After the upgrades are completed, EcoGreen will conduct thorough performance testing, provide training for maintenance staff on the new technologies, and ensure that all removed materials are responsibly disposed of. Collectively, these enhancements will significantly reduce energy usage, improve operational reliability, and strengthen the environmental sustainability and resilience of the City’s public buildings. Final timelines and budget details will be provided after the initial assessments.
Site One: Parking Lot – Guillermo Recoder
Figure 2.1. City of Pinole – Guillermo Recoder Parking Lot, 2548 San Pablo Ave, Pinole, CA 94564.
EcoGreen will update outdated lighting throughout the parking lot with new LED fixtures, enhancing energy efficiency, lighting quality, and overall performance. The new LED lights will provide brighter, more uniform illumination while consuming less energy, thereby reducing operating costs and maintenance needs.
Site Two: Parking Lot – La Casita Bilingue Montessori School Figure 2.2. City of Pinole – La Casita Bilingue Montessori School Parking Lot, 592 Tennent Ave, Pinole, CA 94564.
EcoGreen will carry out a complete LED lighting upgrade across the parking lot, replacing obsolete fixtures.
The project will deliver brighter, more uniform lighting while reducing electricity consumption and maintenance costs. Every component will be code-compliant and aligned with current energy regulations, offering longer life and stronger performance.
Site Three: Parking Lot – Sue’s Place
Figure 2.3. City of Pinole – Sue’s Place Parking Lot, 2265 Pear St, Pinole, CA 94564.
The scope for EcoGreen includes upgrading the parking lot’s existing lighting to energy-saving LED fixtures.
By doing so, lighting quality and comfort will increase, and both energy usage and maintenance needs will drop notably. All equipment will be selected and installed to satisfy relevant building codes and energy standards, ensuring durable, high-performing operation.
Site Four: Parking Lot – Old Town Public Parking 1
Figure 2.4. City of Pinole – Old Town Public Parking Lot, 2180 Prune St, Pinole, CA 94564.
For this parking lot, EcoGreen will replace all outdated fixtures with high-efficiency LED lighting. The upgrade will improve illumination and overall ambiance while reducing energy use and maintenance expenses. All new LEDs will be installed to meet local building codes and energy standards and deliver longer service life with dependable performance.
Site Five: Parking Lot – 612 Tennent Ave
Figure 2.5. City of Pinole – 612 Tennent Ave Parking Lot, 612 Tennent Ave, Pinole, CA 94564.
For this project, EcoGreen intends to convert all existing parking lot luminaires into LED. The transition will elevate visibility and ambiance and drive savings through lower energy use and reduced maintenance. The LED solution will meet all local code and efficiency requirements and is engineered for longevity and reliable performance.
Site Six: City Hall, Fire Sation 73, Post Office5
& Police Department
Figure 2.6. City of Pinole – City Hall, Fire Sation 73 & Police Department, 2131 Pear St & 880 Tennent Ave, Pinole, CA 94564.
EcoGreen will modernize City Hall and Fire Station 73 buildings by installing a new solar photovoltaic system paired with battery energy storage and completing a full roof replacement to enhance structural integrity and long-term performance. These upgrades will improve energy resilience, reduce reliance on grid power, and support the City’s sustainability goals. All new equipment and materials will be installed in accordance with local building codes and energy standards to ensure optimal performance and extended system life. Additionally, the electric storage water heater in City Hall will be replaced with a high-efficiency heat pump water heater to further reduce energy consumption and improve overall building sustainability6.
5 Please note that in order to perform roof replacement on the Post OƯice, a Solar system must be added to the roof. Currently we could not acquire the utility bills for this building. If you are interested, please provide us with the utility bills for the Post OƯice to proceed. 6 Please note that the water heater needs further OBF analysis and will be presented after the incentives are finalized by the utility.
Site Seven: Fernandez Park
Figure 2.7. City of Pinole – Fernandez Park, 595 Tennent Ave, Pinole, CA 94564.
The project scope for EcoGreen includes a full retrofit of the parks existing lighting to high-efficiency LED fixtures. This transition will improve brightness and visual comfort and will substantially reduce electricity consumption and ongoing upkeep. Every LED specified will comply with applicable codes and efficiency requirements, ensuring extended service life and reliable operation.
Site Eight: Youth Center & Playhouse
Figure 2.8. City of Pinole – Youth Center & Playhouse, 635 Tennent Ave, Pinole, CA 94564.
For this building, EcoGreen will implement a comprehensive facility upgrade that includes replacing all outdated lighting with high-efficiency LED fixtures and installing new high-performance HVAC equipment to improve comfort and reduce energy consumption in the youth center. These improvements will provide brighter, more consistent illumination, enhance indoor environmental quality, and significantly lower both energy and maintenance costs. All installations will meet local building and energy code requirements and are designed to deliver long-lasting, reliable performance.
Site Nine: Tiny Tots & Swim Center
Figure 2.9. City of Pinole – Tiny Tots & Swim Center, 2454 Simas Ave, Pinole, CA 94564.
EcoGreen’s scope includes replacing outdated lighting with high-efficiency LED technology, installing a new battery energy storage system to improve resilience and reduce peak demand, and completing a full roof replacement to enhance structural performance and support long-term building efficiency. These improvements will elevate lighting quality, strengthen the facility’s energy infrastructure, and deliver substantial reductions in both power consumption and maintenance costs. All upgrades will comply with applicable codes and standards and are designed to provide extended service life and reliable performance.
Site Ten: Senior Center
Figure 2.10. City of Pinole – Senior Center, 2500 Charles Ave, Pinole, CA 94564.
EcoGreen’s scope of work will include installing a new solar photovoltaic system paired with advanced battery energy storage to enhance the facility’s energy resilience and reduce reliance on grid-supplied electricity. This integrated system will generate clean power on-site, store excess energy for later use, and help lower operational costs through reduced peak demand and improved overall efficiency. Together, these upgrades will strengthen the building’s energy infrastructure and significantly improve its environmental sustainability.
Site Eleven: Wastewater Treatment Plant
Figure 2.11. City of Pinole – WWTP, 11 Tennent Ave, Pinole, CA 94564.
EcoGreen will undertake a comprehensive roof replacement to improve the building’s structural integrity, weather protection, and long-term performance. The new roofing system will enhance durability, reduce maintenance needs, and support overall energy efficiency. All work will be completed in full compliance with local building codes and industry standards, ensuring a reliable and high-quality installation.
Site Twelve: Fire Station 74
Figure 2.12. City of Pinole – Fire Station 74, 3700 Pinole Valley Rd, Pinole, CA 94564.
EcoGreen will implement a comprehensive facility upgrade that includes installing high-efficiency LED lighting, replacing outdated HVAC equipment with modern high-performance systems, completing a full roof replacement, and integrating a new solar photovoltaic system with battery energy storage. These improvements will enhance lighting quality, improve indoor comfort, strengthen building durability, and provide clean, resilient on-site energy. All systems will be installed in full compliance with local building codes and energy standards, ensuring long-lasting performance, reduced maintenance needs, and significant reductions in overall energy use.
Out Of Pocket - Executive Summary
Energy Action Plan for The City of Pinole
EcoGreen Solutions is proud to submit a comprehensive, out-of-pocket Energy Action Plan for the City of Pinole, centered on modernizing municipal facilities with advanced energy-efficient technologies. The plan targets measurable reductions in energy use, improved operational performance, and meaningful progress toward the City’s long-term sustainability goals. EcoGreen Solutions will manage the effort end-to-end, ensuring a streamlined rollout, minimal disruption to City services, and a compelling return on investment.
Project Overview:
EcoGreen Solutions will execute an integrated package of upgrades at select municipal facilities, including Solar PV and Battery Energy Storage, Roof replacement, and High-efficiency HVAC replacements. These proven measures will trim energy use, reduce operating costs, and strengthen the City of Pinole’s commitment to environmental stewardship.
Key Upgrades:
1. Solar PV & BESS
EcoGreen will oversee the implementation of Solar PV and BESS at multiple sites at The City of Pinole. Pairing on-site solar with a battery energy storage system (BESS) lets a municipal facility make and use more of its own clean power when it’s most valuable. Solar cuts daytime kWh purchases, while the battery captures excess generation and discharges during late-afternoon/evening peaks to avoid high time-of-use prices and trim monthly demand charges. This “shift and shave” strategy typically delivers the largest bill reductions under California tariffs and export-compensation rules, while also hedging against future rate increases and creating options to earn incentives through demand response or other grid-support programs.
Just as importantly, Solar & BESS boosts resilience. With islanding controls, a facility can keep priority loads—public safety, communications, servers, traffic signals, or water/wastewater equipment—running through grid outages and Public Safety Power Shutoffs without relying solely on fuel for generators. The system’s monitoring and automated dispatch provide transparent savings and performance data, and the visible commitment to renewables advances climate goals, supports fleet electrification (by powering EV chargers without new demand spikes), and demonstrates environmental leadership to the community.
2. Roof Replacement
EcoGreen will oversee the implementation and upgrade of the rooftops at multiple sites throughout the City. A sound roof is the building’s first line of defense. Replacing an aging or failing roof protects the envelope from water intrusion that can damage interiors, equipment, and finishes, trigger mold and indoor air-quality issues, and disrupt city services. Modern roofing systems improve insulation and air-sealing, and often use high-reflectance “cool roof” membranes that reduce heat gain—lowering HVAC loads, stabilizing indoor temperatures, and cutting utility and maintenance costs over the roof’s life. A new roof also brings current code compliance, safety, and fire performance, reducing liability and unplanned repairs.
Roof replacement is also a strategic enabler for other capital projects. If you plan to add rooftop solar, HVAC upgrades, skylights, or new penetrations, starting with a warrantied roof ensures structural readiness, proper attachment details, and aligned lifecycles—so you don’t have to remove and reinstall solar to re-roof midstream. Coordinating the roof with solar/BESS or mechanical work minimizes downtime, streamlines permitting, and maximizes warranties and performance guarantees, turning a necessary asset renewal into a platform for long-term resilience and efficiency.
3. High-efficiency HVAC Replacement
Ecogreen will oversee the implementation of new High-efficiency HVACs to replace old energy consuming units at multiple sites. Replacing old HVAC systems with high-efficiency units cuts energy use and peak demand, lowering utility bills while delivering steadier temperatures, better humidity control, and quieter operation. Modern equipment uses variable-speed compressors and ECM fans, advanced controls, and economizers to match output to actual load, improving comfort and indoor air quality with smarter ventilation and filtration. Reliability also improves: new systems have fewer breakdowns, lower maintenance costs, stronger warranties, and readily available parts. Upgrades ensure compliance with current codes and refrigerant standards (avoiding obsolete, costly refrigerants like R-22) and can enable low-carbon heating with high-efficiency heat pumps. Finally, right-sized, controllable HVAC integrates cleanly with building management systems, demand response, and on-site solar/BESS—creating additional savings, resilience, and a future-ready platform for city facilities.
4. LED Lighting Replacement
EcoGreen will upgrade outdated lighting systems in City facilities to energy-efficient LED lighting. LEDs provide superior energy efficiency, longer lifespans, and lower maintenance costs compared to traditional lighting. This upgrade will lead to significant reductions in electricity consumption, decrease ongoing maintenance expenses, and enhance the quality and consistency of lighting in municipal buildings and outdoor areas.
Appendix A
Solar & BESS Quotes
Fire StaƟon 73 – Solar Design
System Loss
SShhaaddiinngg:: 11..11%%
RReefflleeccttiioonn:: 33..33%%
SSooiilliinngg:: 22..00%%
IIrrrraaddiiaannccee:: 00..55%%
TTeemmppeerraattuurree:: 22..44%%
MMiissmmaattcchh:: 44..22%%
WWiirriinngg:: 00..55%%
CClliippppiinngg:: 00..00%%
IInnvveerrtteerr:: 33..55%%
AACC SSyysstteemm:: 00..55%%
Energy Consumption
kWh
Production
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 10K
20K
30K
System Metrics Project Location
Design Landon OPT1
Module DC
Nameplate 122.22 kW
Inverter AC
Nameplate
120.00 kW
Load Ratio: 1.02
Annual Production 191.2 MWh
Performance Ratio 83.1%
kWh/kWp 1,564.3
Weather Dataset TMY, 10km grid (38.05,-122.25), NREL
(prospector)
Simulator Version db6e4aa8e5-76b31843a6-7dc05338ce-ed2ac6a4ac Project Details
Address 880 Tennent Ave, Pinole, CA 94564, USA
Owner Ethan Archibald
Last
Modified
Ethan Archibald
3 days ago
Location (38.004275400000004, -122.290708)
(GMT -8)
Profile Default Commercial
Landon OPT1 City of Pinole - Fire Station 73 880 Tennent Ave, Pinole, CA 94564, USA Annual Production Report produced by Vahid Jamal
Annual Production
Description Output % Delta
Irradiance
(kWh/m )
Annual Global Horizontal Irradiance 1,818.0 -
POA Irradiance 1,881.5 3.5%
Shaded Irradiance 1,860.0 -1.1%
Irradiance After Reflection 1,798.6 -3.3%
Irradiance After Soiling 1,762.6 -2.0%
Total Collector Irradiance 1,762.5 -0.0%
Energy
(kWh)
Nameplate 215,329.6 -
Output at Irradiance Levels 214,328.2 -0.5%
Output at Cell Temperature Derate 209,195.7 -2.4%
Output after Electrical Mismatch 200,327.4 -4.2%
Optimal DC Output 199,281.1 -0.5%
Constrained DC Output 199,214.9 -0.0%
Inverter Output 192,153.8 -3.5%
Energy to Grid 191,193.0 -0.5%
Temperature Metrics
Avg. Operating Ambient Temp 16.0°C
Avg. Operating Cell Temp 25.0°C
Simulation Metrics
Operating Hours 4,659
Solved Hours 4,659
Pending Hours -
Error Hours -
2 Condition Set
Description Condition Set 1
Weather Dataset TMY, 10km grid (38.05,-122.25), NREL(prospector) (download) Solar Angle Location Meteo Lat/Lng
Transposition Model Perez Model
Temperature Model Sandia Model
Temperature Model Parameters
Rack Type a b Temperature Delta
Fixed Tilt -3.56 -0.08 3.0°C
Flush Mount -2.81 -0.05 0.0°C
East-West -3.56 -0.08 3.0°C
Carport -3.56 -0.08 3.0°C
Soiling (%)
J F M A M J J A S O N D
2 2 2 2 2 2 2 2 2 2 2 2
Irradiation Variance 5.0%
Cell Temperature Spread 4.0°C
Module Binning Range -2.5% to 2.5%
AC System Derate 0.50%
Component Characterizations
Type Component Characterization
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Inverter Neptune30K-LV (Northern Electric
Power Technology, Inc.) Default Characterization
Annual Production Report produced by Vahid Jamal
Monthly Shading
Month GHI (kWh/m ) POA (kWh/m ) Shaded (kWh/m ) Nameplate (kWh) Grid (kWh) January 65.8 71.4 70.5 7,993.4 7,180.4
February 78.8 84.6 83.5 9,561.8 8,577.4
March 147.7 155.1 153.6 17,739.4 16,036.3
April 182.9 188.4 186.2 21,626.4 19,348.8
May 224.8 227.5 224.7 26,168.1 23,229.3
June 242.3 243.6 240.7 28,077.2 24,755.2
July 241.4 243.2 240.8 28,090.9 24,681.6
August 213.5 217.8 215.6 25,091.7 22,163.7
September 165.9 172.9 171.2 19,831.0 17,478.6
October 117.6 125.8 124.4 14,280.0 12,674.1
November 75.7 83.0 81.9 9,295.1 8,300.6
December 61.6 68.0 67.0 7,574.7 6,767.1
2 2 2
Design Wiring Zone
Description Combiner Poles String Size Stringing Strategy Wiring Zone - 4 - 16 Along Racking
Design BOM
Component Type Quantity
Neptune30K-LV Inverters 4
Q.TRON XL-G2.3 / BFG 630W Modules 194
10 AWG (Copper) Strings 14
Annual Production Report produced by Vahid Jamal
City Hall – Solar Design
System Loss
SShhaaddiinngg:: 00..00%%
RReefflleeccttiioonn:: 33..55%%
SSooiilliinngg:: 22..00%%
IIrrrraaddiiaannccee:: 00..55%%
TTeemmppeerraattuurree:: 22..44%%
MMiissmmaattcchh:: 33..55%%
WWiirriinngg:: 00..44%%
CClliippppiinngg:: 00..11%%
IInnvveerrtteerr:: 33..33%%
AACC SSyysstteemm:: 00..55%%
Energy Consumption
kWh
Production
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 5K
10K
15K
20K
25K
System Metrics Project Location
Design Landon OPT1
Module DC
Nameplate 106.47 kW
Inverter AC
Nameplate
90.00 kW
Load Ratio: 1.18
Annual Production 168.6 MWh
Performance Ratio 84.8%
kWh/kWp 1,583.2
Weather Dataset TMY, 10km grid (38.05,-122.25), NREL
(prospector)
Simulator Version db6e4aa8e5-76b31843a6-7dc05338ce-ed2ac6a4ac Project Details
Address 2131 Pear St
Owner Ethan Archibald
Last
Modified
Ethan Archibald
a minute ago
Location (38.004314000000015, -122.2911913)
(GMT -8)
Landon OPT1 City of Pinole - City Hall 2131 Pear St
Annual Production Report produced by Vahid Jamal
Annual Production
Description Output % Delta
Irradiance
(kWh/m )
Annual Global Horizontal Irradiance 1,818.0 -
POA Irradiance 1,865.9 2.6%
Shaded Irradiance 1,865.8 -0.0%
Irradiance After Reflection 1,799.7 -3.5%
Irradiance After Soiling 1,763.7 -2.0%
Total Collector Irradiance 1,763.6 -0.0%
Energy
(kWh)
Nameplate 187,705.7 -
Output at Irradiance Levels 186,830.7 -0.5%
Output at Cell Temperature Derate 182,369.2 -2.4%
Output after Electrical Mismatch 176,064.8 -3.5%
Optimal DC Output 175,291.1 -0.4%
Constrained DC Output 175,103.3 -0.1%
Inverter Output 169,409.3 -3.3%
Energy to Grid 168,562.2 -0.5%
Temperature Metrics
Avg. Operating Ambient Temp 16.0°C
Avg. Operating Cell Temp 25.0°C
Simulation Metrics
Operating Hours 4,659
Solved Hours 4,659
Pending Hours -
Error Hours -
2 Condition Set
Description Condition Set 1
Weather Dataset TMY, 10km grid (38.05,-122.25), NREL(prospector) (download) Solar Angle Location Meteo Lat/Lng
Transposition Model Perez Model
Temperature Model Sandia Model
Temperature Model Parameters
Rack Type a b Temperature Delta
Fixed Tilt -3.56 -0.08 3.0°C
Flush Mount -2.81 -0.05 0.0°C
East-West -3.56 -0.08 3.0°C
Carport -3.56 -0.08 3.0°C
Soiling (%)
J F M A M J J A S O N D
2 2 2 2 2 2 2 2 2 2 2 2
Irradiation Variance 5.0%
Cell Temperature Spread 4.0°C
Module Binning Range -2.5% to 2.5%
AC System Derate 0.50%
Component Characterizations
Type Component Characterization
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Inverter Neptune30K-LV (Northern Electric
Power Technology, Inc.) Default Characterization
Annual Production Report produced by Vahid Jamal
Monthly Shading
Month GHI (kWh/m ) POA (kWh/m ) Shaded (kWh/m ) Nameplate (kWh) Grid (kWh) January 65.8 70.1 70.1 6,902.3 6,266.2
February 78.8 82.6 82.6 8,201.7 7,448.6
March 147.7 153.2 153.2 15,372.2 14,024.9
April 182.9 186.3 186.3 18,806.5 17,062.8
May 224.8 226.8 226.8 22,957.6 20,623.6
June 242.3 243.3 243.3 24,673.2 21,997.9
July 241.4 243.4 243.4 24,700.2 21,953.9
August 213.5 217.4 217.4 21,984.9 19,641.5
September 165.9 171.5 171.5 17,273.4 15,381.4
October 117.6 123.8 123.8 12,346.9 11,076.4
November 75.7 81.1 81.1 7,987.4 7,215.6
December 61.6 66.3 66.3 6,499.4 5,869.4
2 2 2
Design Wiring Zone
Description Combiner Poles String Size Stringing Strategy Wiring Zone 2 - 4 - 16 Along Racking
Design BOM
Component Type Quantity
Neptune30K-LV Inverters 3
Q.TRON XL-G2.3 / BFG 630W Modules 169
10 AWG (Copper) Strings 13
Annual Production Report produced by Vahid Jamal
Senior Center – Solar Design
System Loss
SShhaaddiinngg:: 00..22%%
RReefflleeccttiioonn:: 33..44%%
SSooiilliinngg:: 22..00%%
IIrrrraaddiiaannccee:: 00..55%%
TTeemmppeerraattuurree:: 33..66%%
MMiissmmaattcchh:: 33..22%%
WWiirriinngg:: 00..44%%
CClliippppiinngg:: 00..00%%
IInnvveerrtteerr:: 22..66%%
AACC SSyysstteemm:: 00..55%%
Energy Consumption
kWh
Production
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 10K
20K
30K
System Metrics Project Location
Design Landon OPT1
Module DC
Nameplate 110.88 kW
Inverter AC
Nameplate
104.00 kW
Load Ratio: 1.07
Annual Production 176.5 MWh
Performance Ratio 84.7%
kWh/kWp 1,591.4
Weather Dataset TMY, 10km grid (38.05,-122.25), NREL
(prospector)
Simulator Version db6e4aa8e5-76b31843a6-7dc05338ce-ed2ac6a4ac Project Details
Address 2500 Charles Ave, Pinole, CA 94564, USA
Owner Ethan Archibald
Last
Modified
Ethan Archibald
10 days ago
Location (38.00738450000001, -122.2899775)
(GMT -8)
Profile Default Commercial (International)
Landon OPT1 City of Pinole - Senior Center 2500 Charles Ave, Pinole, CA 94564, USA Annual Production Report produced by Vahid Jamal
Annual Production
Description Output % Delta
Irradiance
(kWh/m )
Annual Global Horizontal Irradiance 1,818.0 -
POA Irradiance 1,879.1 3.4%
Shaded Irradiance 1,875.8 -0.2%
Irradiance After Reflection 1,812.3 -3.4%
Irradiance After Soiling 1,776.0 -2.0%
Total Collector Irradiance 1,776.1 0.0%
Energy
(kWh)
Nameplate 196,848.8 -
Output at Irradiance Levels 195,941.0 -0.5%
Output at Cell Temperature Derate 188,913.3 -3.6%
Output after Electrical Mismatch 182,864.1 -3.2%
Optimal DC Output 182,077.8 -0.4%
Constrained DC Output 182,071.6 -0.0%
Inverter Output 177,337.6 -2.6%
Energy to Grid 176,450.9 -0.5%
Temperature Metrics
Avg. Operating Ambient Temp 16.0°C
Avg. Operating Cell Temp 27.1°C
Simulation Metrics
Operating Hours 4,659
Solved Hours 4,659
Pending Hours -
Error Hours -
2 Condition Set
Description Condition Set 1
Weather Dataset TMY, 10km grid (38.05,-122.25), NREL(prospector) (download) Solar Angle Location Meteo Lat/Lng
Transposition Model Perez Model
Temperature Model Sandia Model
Temperature Model Parameters
Rack Type a b Temperature Delta
Fixed Tilt -3.56 -0.08 3.0°C
Flush Mount -2.81 -0.05 0.0°C
East-West -3.56 -0.08 3.0°C
Carport -3.56 -0.08 3.0°C
Soiling (%)
J F M A M J J A S O N D
2 2 2 2 2 2 2 2 2 2 2 2
Irradiation Variance 5.0%
Cell Temperature Spread 4.0°C
Module Binning Range -2.5% to 2.5%
AC System Derate 0.50%
Component Characterizations
Type Component Characterization
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module ZXM7-SHLDD144 550
(ZNShine Solar)
Spec Sheet
Characterization, PAN
Inverter S6-EH3P30K03-LV-YD-H-US
(208Y) (Solis) Spec Sheet
Inverter S6-EH3P30K03-LV-YD-H-US
(208Y) (Solis) Spec Sheet
Annual Production Report produced by Vahid Jamal
Monthly Shading
Month GHI (kWh/m ) POA (kWh/m ) Shaded (kWh/m ) Nameplate (kWh) Grid (kWh) January 65.8 71.7 71.4 7,348.9 6,799.4
February 78.8 83.1 82.8 8,588.0 7,894.9
March 147.7 154.7 154.4 16,170.4 14,703.9
April 182.9 186.4 186.2 19,581.3 17,665.6
May 224.8 226.9 226.7 23,925.6 21,411.8
June 242.3 242.9 242.7 25,659.6 22,742.9
July 241.4 244.3 244.0 25,819.0 22,778.5
August 213.5 219.0 218.8 23,074.0 20,460.3
September 165.9 173.6 173.2 18,201.2 16,111.9
October 117.6 125.9 125.7 13,085.4 11,749.0
November 75.7 82.8 82.3 8,481.8 7,758.3
December 61.6 67.7 67.4 6,913.6 6,374.3
2 2 2
Design Wiring Zone
Description Combiner Poles String Size Stringing Strategy Wiring Zone - 8 - 16 Along Racking
Wiring Zone 2 - 8 - 16 Along Racking
Design BOM
Component Type Quantity
S6-EH3P30K03-LV-YD-H-US (208Y) Inverters 4
ZXM7-SHLDD144 550 Modules 0
Q.TRON XL-G2.3 / BFG 630W Modules 176
10 AWG (Copper) Strings 12
Annual Production Report produced by Vahid Jamal
Fire StaƟon 74 – Solar Design
System Loss
SShhaaddiinngg:: 00..88%%
RReefflleeccttiioonn:: 33..11%%
SSooiilliinngg:: 22..00%%
IIrrrraaddiiaannccee:: 00..55%%
TTeemmppeerraattuurree:: 44..66%%
MMiissmmaattcchh:: 1122..44%%
WWiirriinngg:: 00..44%%
CClliippppiinngg:: 00..11%%
IInnvveerrtteerr:: 22..00%%
AACC SSyysstteemm:: 00..55%%
Energy Consumption
kWh
Production
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 2K
4K
6K
8K
System Metrics Project Location
Design Landon OPT1
Module DC
Nameplate 35.28 kW
Inverter AC
Nameplate
30.00 kW
Load Ratio: 1.18
Annual Production 51.2 MWh
Performance Ratio 76.1%
kWh/kWp 1,452.5
Weather Dataset TMY, 10km grid (37.95,-122.25), NREL
(prospector)
Simulator Version 14aaf3282e-56812526cf-de2f6bde27-bfc843125a Project Details
Address 3700 Pinole Valley Rd, Pinole, CA 94564,
USA
Owner Vahid Jamal
Last
Modified
Vahid Jamal
2 months ago
Location (37.9806349, -122.27104769999998)
(GMT -8)
Profile Default Commercial (International)
Landon OPT1 City of Pinole - Fire Station 74 3700 Pinole Valley Rd, Pinole, CA 94564, USA
Annual Production Report produced by Vahid Jamal
Annual Production
Description Output % Delta
Irradiance
(kWh/m )
Annual Global Horizontal Irradiance 1,794.1 -
POA Irradiance 1,909.7 6.4%
Shaded Irradiance 1,895.2 -0.8%
Irradiance After Reflection 1,836.4 -3.1%
Irradiance After Soiling 1,799.7 -2.0%
Total Collector Irradiance 1,801.0 0.1%
Energy
(kWh)
Nameplate 63,517.8 -
Output at Irradiance Levels 63,223.9 -0.5%
Output at Cell Temperature Derate 60,306.6 -4.6%
Output after Electrical Mismatch 52,823.8 -12.4%
Optimal DC Output 52,601.8 -0.4%
Constrained DC Output 52,545.0 -0.1%
Inverter Output 51,500.9 -2.0%
Energy to Grid 51,243.4 -0.5%
Temperature Metrics
Avg. Operating Ambient Temp 16.0°C
Avg. Operating Cell Temp 29.0°C
Simulation Metrics
Operating Hours 4,658
Solved Hours 4,658
Pending Hours -
Error Hours -
2 Condition Set
Description Condition Set 1
Weather Dataset TMY, 10km grid (37.95,-122.25), NREL(prospector) (download) Solar Angle Location Meteo Lat/Lng
Transposition Model Perez Model
Temperature Model Sandia Model
Temperature Model Parameters
Rack Type a b Temperature Delta
Fixed Tilt -3.56 -0.08 3.0°C
Flush Mount -2.81 -0.05 0.0°C
East-West -3.56 -0.08 3.0°C
Carport -3.56 -0.08 3.0°C
Soiling (%)
J F M A M J J A S O N D
2 2 2 2 2 2 2 2 2 2 2 2
Irradiation Variance 5.0%
Cell Temperature Spread 4.0°C
Module Binning Range -2.5% to 2.5%
AC System Derate 0.50%
Component Characterizations
Type Component Characterization
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Module Q.TRON XL-G2.3 / BFG 630W
(Qcells)
Spec Sheet
Characterization, PAN
Inverter Solis-30K-US (480 Vac) (Ningbo
Ginlong Technologies) Spec Sheet
Annual Production Report produced by Vahid Jamal
Monthly Shading
Month GHI (kWh/m ) POA (kWh/m ) Shaded (kWh/m ) Nameplate (kWh) Grid (kWh) January 68.8 82.6 81.9 2,707.8 2,218.0
February 76.7 87.5 86.7 2,883.9 2,362.5
March 147.0 161.2 159.8 5,349.4 4,357.7
April 185.9 194.5 192.9 6,483.0 5,249.6
May 223.6 225.6 223.8 7,530.1 6,112.3
June 238.3 237.0 235.3 7,925.6 6,412.8
July 229.8 230.4 228.9 7,705.7 6,181.8
August 198.1 203.8 202.4 6,810.8 5,492.0
September 166.6 179.9 178.5 5,993.0 4,750.1
October 117.9 134.7 133.8 4,464.0 3,544.2
November 79.0 95.9 95.1 3,151.1 2,527.4
December 62.2 76.7 76.1 2,513.5 2,035.1
2 2 2
Design Wiring Zone
Description Combiner Poles String Size Stringing Strategy Wiring Zone 2 12 13 - 16 Along Racking
Design BOM
Component Type Quantity
4 input Combiners Combiners 1
6 AWG (Copper) Home
Runs
1 Solis-30K-US (480 Vac) (Ningbo
Ginlong Technologies) Inverters 1
Qcells, Q.TRON XL-G2.3 / BFG 630W,
(630W) Modules 56
10 AWG (Copper) Strings 4
Annual Production Report produced by Vahid Jamal
Appendix B
HVAC Replacement Quotes
Price: $145,725.75
3T STD EFF SPLIT HP 208/1PH
Equipment
3 Ton 15 SEER Split Heat Pump, 208/230V, 1PH
Flood Prevention Kit
In-Unit Filter Rack
220VAC/1 Whip
220VAC Fuses
220VAC/3 Fusible Disconnect
Warranty
5-Year Compressor
5-Year Parts
1-Year Labor
Additional Services Included
All Required Material
Equipment Removal
Area Clean Up
Updated Vent Package
Code Compliance Upgrades
Seal Return Plenum
Seal Supply Plenum
5 $145,725.75
Customer Contact:
H: (510) 724-9842
E: [email protected]
Service Location:
3700 Pinole Valley Rd
Pinole, CA 94564
HVAC PROPOSAL
Job Name City of Pinole - Fire Station
74 & Youth Center
EcoGreen Solutions, Inc.
27671 La Paz Road Suite 100
Laguna Niguel, CA 92677
Presented to:
City of Pinole
3700 Pinole Valley Rd.
Pinole, CA 94564 Issue Date November 25 2025
Contact Us: (949) 364-6800 [email protected] ecogreen-solutions.com
Appendix C
EcoGreen Statement of Work
1 Statement of Work
1. SCOPE OF WORK: EcoGreen Solutions shall furnish all
the materials and perform all of the work shown and/or
described in the Energy Audit and Quote. EcoGreen
Solutions is not responsible for touch up work i.e. – paint where replacement fixtures don’t exactly match existing fixtures, ceiling tiles, etc…
a. VFD/VSD installation: If the project includes a
VFD/VSD, standard installation costs include – VFD,
startup, card, programming, installation of any conduit, running power, concrete footing (if needed), VFD
mounting and interconnect to SCADA panel. Installation
costs that are not included and would be an additional
cost – wiring diagrams, fencing, gates, enclosures, relay box, controls.
2. PROJECT COST: The amount due for material and labor
to be performed is $(Project Cost) , subject to additions and deductions pursuant to authorized change
orders/adjustment letters.
3. PAYMENT & UTILITY FINANCING: EcoGreen Solutions
has worked with Customer to secure Utility financing on behalf of the Customer to fund payment of this project, of which, terms and payback periods are detailed in the
Utility On-Bill Financing (OBF) documentation – PGE
Project #/TIF # (TIF NUMBER.
Payment of the project shall be paid in the manner
following:
Project Cost $PROJECT COST
Estimated Tax Benefit $0
Estimated Utility OBF $PROJECT COST
SUBTOTAL $0
Estimated Customer Out of
Pocket Contribution
$0
a. Customer understands that final utility rebate
and OBF amounts issued may vary based on final
installation counts and subject to additions and
deductions pursuant to authorized change
orders/adjustment letters.
b. Customer understands that should utility
determine that OBF loan proceeds shall not be
issued due to customer’s credit standing or has
otherwise placed customer’s repayment of the
loan at risk, Customer shall be liable for payment
of any product, labor, and installation due. This
includes any product demos that aren’t returned
to EcoGreen Solutions.
c. Notice to Proceed: Once Utility On-Bill
Financing is approved, if required, EcoGreen
Solutions will provide LED demo fixture/lamps to
assure proper light levels, color and aesthetics.
Written confirmation from the Customer that
demos are approved and approval to move
forward with the ordering of product and
installation will serve as formal Notice To
Proceed.
4. GENERAL TERMS AND CONDITIONS
a. All work shall be completed in a workmanlike
manner and in compliance with all building
codes and other applicable laws.
b. To the extent required by law all work shall be
performed by individuals duly licensed and
authorized by law to perform the work.
c. EcoGreen Solutions may at its discretion
engage subcontractors to perform work
hereunder, provided EcoGreen Solutions shall
fully pay said subcontractor and in all instances
remain responsible for the proper completion of
the project.
d. EcoGreen Solutions warrants it is adequately
insured for injury to its employees and others
incurring loss or injury as a result of the acts of
EcoGreen Solutions or its employees and
subcontractors.
e. Customer shall at its own expense obtain all
permits necessary for the work to be performed.
f. EcoGreen Solutions agrees to remove all debris
and leave the premises in clean condition unless
instructed by Customer to do otherwise.
2 g. EcoGreen Solutions shall dispose of all
hazardous lamps and tubes utilizing a proper
recycling program unless instructed by Customer
to do otherwise.
h. EcoGreen Solutions shall not be liable for any
delay due to circumstances beyond its control
including strikes, casualty or general
unavailability of materials.
i. Customer is responsible for verification of
fixture counts and hours of operation reflected
in the Energy Audit.
5. HAZARDOUS CONDITIONS: In the event that EcoGreen
Solutions discovers existing or developing spore or mold growth, asbestos or other potentially hazardous conditions at the Project location, EcoGreen Solutions will stop work and will not attempt to test, repair or remediate such
conditions. At Customer’s sole expense, Customer must
arrange to have the hazardous condition removed by a
third party in compliance with applicable laws within a reasonable period of time, or EcoGreen Solutions may
cancel this project. If the project is canceled, Customer agrees to pay EcoGreen Solutions the costs of materials, labor and services provided through the date of
cancellation.
6. WARRANTIES:
a. MANUFACTURER WARRANTIES. Products
installed as part of the scope of work are
covered by separate manufacturers’ warranties
(hereinafter, “Manufacturer Warranties”).
EcoGreen Solutions will assign to Customer any
Manufacturer Warranties in effect upon
installation. EcoGreen Solutions will also provide
Customer reasonable assistance in contacting
manufacturers. If manufacturer files for
bankruptcy or goes out of business, EcoGreen
Solutions is not liable or responsible for
continued warranty support.
b. LIMITED WARRANTY. EcoGreen Solutions
provides a limited warranty of 90 days (the
“Limited Warranty Period”), after the date of
invoice. For the avoidance of doubt, this Limited
Warranty does not cover parts already covered
by the Manufacturer Warranties set forth in
above. During the Limited Warranty Period,
EcoGreen Solutions will at its expense repair or
replace any parts or labor covered by the Limited
Warranty.
c. OBTAIN WARRANTY SERVICE. To obtain
warranty service, you must notify EcoGreen
Solutions in writing or via email at
[email protected] of any defect.
Provided that the Warranty has not expired, has
otherwise voided, or is subject to an exclusion,
EcoGreen Solutions will repair or replace the
defect within a reasonable time after you notify
EcoGreen Solutions.
If a fixture fails, please take a photo and send it
to [email protected], and include
location information in your email. The photo
should be close up so we can properly match the
product with the replacement. We will order
replacement products and schedule the
installation. If a product is in stock, EcoGreen
Solutions will ship the replacement
immediately. If the product is not in stock
EcoGreen Solutions will order the replacement
parts from the factory. Please be aware that
some of our suppliers require 6-8 weeks lead
time. EcoGreen Solutions does not cover
shipping and handling for fixtures.
If a fixture has failed and is past our 3 months
parts and labor period, EcoGreen Solutions will
work with the factory to get the replacement
material for you. We do not cover the cost of
shipping and handling from the factory to our
warehouse or to your location. If you do not
have a qualified electrician to install the
replacement product, please contact us at the
email address above. A quote for the labor to
install the product will be provided in 1-2
business days.
If a lamp fails, please follow the same procedure
as for fixtures. EcoGreen Solutions will send
Customer the replacement lamp. Labor is not
covered for lamps. Shipping and handling also is
not covered on warranty claims for lamps.
Warranty claims will not apply for:
Product that has been modified by the
customer.
Product that was subject to misuse,
vandalism or negligence.
*IMPORTANT* EcoGreen Solutions must receive
the fixture/lamp/driver back once your product
has been replaced. We can receive credit for the
replacement product only if the factory receives
the failed unit back. Failure to return the failed
product to EcoGreen Solutions within 30 days
will result in an invoice for the full retail price of
the product.
3 If the failed product has been discontinued by
the manufacturer and is no longer supported by
a factory, EcoGreen Solutions will suggest a
similar replacement LED fixture or lamp.
EcoGreen Solutions cannot be held responsible
for product lines that have been discontinued;
however, we will make every effort to find a
similarly performing product.
7. MAINTENANCE AND REPAIR: If the products require
maintenance or repair that is not covered by the
warranties set forth above, EcoGreen Solutions will not perform this work unless you enter into a separate
agreement to perform these services at your expense.
Appendix D
Investor Utility Services Agreement
- CONFIDENTIAL -
1 INVESTOR UTILITY SERVICES AGREEMENT
Contract No. _____________
General Terms and Conditions of Service
2. 3.
4. 5.
6. 1. Term This Investor-USA shall be effective as of the Effective Date and continue until the later of (i)two years following the Effective Date; or (ii)thirty (30) days following any termination or the expiration of the last outstanding PA(the“Initial Term” or the “Base Service Term”). The Initial Term maybe extended by the Parties’ consent with respect to any PA(an “Extension Term”).
Scope of Services Customer is engaging Provider to perform the Site Service(s) at the Service Site(s) specified in each PA, which shall include but not be limited to:
a. at Provider’s sole cost and expense, We will retain a qualified contractor(s) (“EPC Provider(s)”) to design, purchase, deliver, install and commission all Service Units to the Service Site(s);
b. the provision at no additional cost, of service/maintenance for all Service Units installed; all as specified in the applicable PA. All Service Units installed in combination with the Site Services performed at an individual Service Site shall be considered a “Service Project”. Until a PA is executed, neither Party has any obligations under this Investor’s-USA.
Service Project Acknowledgement and Acceptance As to any Service Project specified in a PA and within five (5) business days following Service Unit(s) installation, We will notify You of Your choice to either; a. sign an Acknowledgement and Acceptance Certificate (“AAC”) that We will provide to You, a confirmation that Service Project installation is complete, and is operational according to the requirements of this investor -USA and its applicable PA; or b. deliver to Us a written notice describing any material deficiencies or errors.
In the event of(b.),Provider shall remedy any deficiencies, and within three (3)business days of completing such remedy You agree to execute the applicable AAC. By executing the AAC, You are irrevocably providing complete “Customer Acceptance” to commencing all obligations You have under this investor-USA and applicable PA. Customer shall not unreasonably withhold, condition, or delay execution of the AAC, any of which would constitute a breach of this investor-USA.
Service Payments
a. You are agreeing to use reasonable efforts to make scheduled monthly payments using Automated Clearing House (“ACH”)for the Site Service(s)provided by Us in the amount set forth in each executed PA(“Service Payments”).Accordingly, You agree to execute a form of ACH payment from Your designated bank account directly to a bank account provided by Us to You. Upon request we will invoice you electronically at least twenty (25) days prior to each Service Payment’s due date. You also agree, unless otherwise provided for herein, that making the Service Payments under any applicable PA is absolute and unconditional throughout the Initial Term, or any Extension Term(s) and not subject to any waiver or setoff for any reason whatsoever. Notwithstanding the last sentence in subparagraph a. above, Provider agrees to the following “Minimal Performance & Availability Standard” as follows: (i)ensure the Service Unit(s)is available and performs to manufacturer’s specifications not less than 92% of the actual hours of service, excluding however, scheduled maintenance hours, a Force Majeure event, Customer-caused outages, grid failures, utility issues, or upstream service failures; and(ii)if availability or performance falls below 92% of the actualhoursof service for more than thirty (30)
b.
consecutive days, Customer shall be entitled to a Service Payment credit, not to exceed ( )%of the monthly Service Payment.
Rebates, Incentives and Environmental Attributes All rebates and incentive payments associated with the installed Service Units will be allocated to Us or Our assigns, unless otherwise specified in any relevant PA. Unless mutually agreed to in writing otherwise, We will own any and all other green attributes associated with the Service Units and operation of them including but not limited to renewable energy certificates (the “Attributes”). Service Units Ownership We and/or Our assigns will, at all times, own and continue to own all title and legal and beneficial ownership interests in the Service Units. You will keep and use the Service Units only at the location shown in a PA. You agree that the Service Units cannot be altered, modified, used other
This Investor’ Utility Services Agreement,(this “-Investor’-USA”),is entered into this _______dayof___________,20___(the “Effective Date”)between Investor (“Provider”, “We”, “Us”, “Our”) and____________________ located at _____________________________________(“Customer”, “You”, “Your”). Provider and Customer will each be a “Party” in this Investor’s-USA and together may be referred to as “Parties”. You are agreeing to accept beneficial investor utility services from Us to You and Your designated locations (each such location a “Service Site”)owned, leased, or other legal right to use by You, as described in one or more Project Addendums (each a “PA”) attached to this Investor’s-USA as of the date hereof or added later (collectively, the “Site Services”).Any and all service equipment and technologies chosen for, and installed at, each Service Site by Provider (the “Service Units”) as a component of this investor-USA’s Site Services shall remain at all times the property of the investor, or its affiliates or assigns.
- CONFIDENTIAL -
2 7.
8. 9.
than for its intended purpose or moved from that location without Our advance written approval. All Service Units and other assets used in performing the Site Services, originally installed or added after the Effective Date, will remain Our sole personal property, and will not attach to, be deemed a part of, or fixture to, the Service Site, unless We have transferred title to You as provided for herein. You shall not allow to exist any lien or encumbrance on the Service Units or other assets of Provider. If You cause a lien to be filed, You must notify Us within thirty (30) days of such filing and immediately commence, at Your own expense, to have such lien discharged or removed. You agree to Our filing or recording any documents or instruments, including Uniform Commercial Code (“UCC”) or fixture filings, to protect Our interest in the Service Units. End of Term Options; Early Termination; Change of Control; Non-Appropriation End of Term Options: Provided that You are not in default under this investor-USA or a PA, You may choose one of the following end of term options (the “End of Term Options”) for a relevant Service Project approaching the expiration of its Base Service Term by providing written notice to Us at least sixty (60) days in advance of the applicable expiration date. If the Parties fail to agree on any of the End-of-Term Options, We will deem you to have chosen the Termination Option. With any such choice, the Parties agree to execute the appropriate agreements to memorialize Your choice. Your End-of-Term Options are:
a.
b.
c.
Upgrade Option – We agree to replace or improve the Service Unit(s) under new, mutually agreeable, PA terms and conditions. Extension Option - You may choose to extend the existing Base Service Term upon negotiating an Extension Term and new Service Payment with Us (typically lower than Initial Term). Termination Option - You may choose to terminate the specific PA whereupon We shall either remove all Service Units from the Service Site or, if We so elect, abandon the Service Unit(s) and transfer title to You on an ‘AS IS’, ‘WHERE IS’ basis. Purchase Option – You may choose to purchase all, but not less than all, the Service Units and pay Us the then Fair Market Value (“FMV”) for the Service Units. “FMV” means the amount that would be paid by knowledgeable third party, in an arms-length transaction, as the salvage value of the Service Units, net of any costs deemed reasonable for removal, plus any costs described in Section 8. Each Party may choose to receive an offer from a knowledgeable third party and the average of these will constitute the FMV. Any dispute to the value of the FMV will be settled through arbitration, or if We so elect, We may abandon the Service Unit(s) and transfer title to You on an ‘AS IS’, ‘WHERE IS’ basis.
d.
Early Termination: While the obligation to make all the Service Payments under the applicable PA is absolute and unconditional throughout the Initial Term, or any Extension Term(s), of this investor-USA, You may choose to terminate a PA in accordance with the terms of the PA prior to the end of the Base Service Term (“Early Termination Option”) by paying the “Early Termination Cost” stated in Table 4. of the PA for the month in which the termination may take effect. Change of Control: In the case that one or more of Your Service Sites is transferred to new ownership, i.e., to any unaffiliated person or entity in an entity or asset sale, or in an event of re-organization, then regardless of any limitations under the PA, you may either:
a. Pay the Early Termination Cost stated in the PA, or
b. Assign the PA to the new owner of the Service Site or any related affiliate on the condition that the new owner shall execute an assignment of the investor-USA agreeing to take on all Your obligations under the Investor-USA and any relevant PA, and further that we consent to the transfer in our sole discretion, which consent shall not be unreasonably withheld.
Non-Appropriation: If Customer is a public entity and funds are not appropriated for any fiscal year after good-faith efforts to secure such appropriations, You may terminate this Investor-USA and/or applicable PA upon (i) giving Provider at least ninety (90) days written notice; and (ii) paying to Provider the Non-Appropriation Cost in Table 5 of the applicable PA for the month in which the termination occurs. Upon receipt of payment, Provider will immediately cause to convey transfer of title to the Service Unit(s) to You, AS IS, WHERE IS. Other than explicitly provided in this Investor-USA and/or an applicable PA, nothing in this Investor-USA shall be deemed to grant You any right to terminate this Investor-USA or any PA prior to the end of the Initial Term, any Extension Term(s).
Settlement In closing out any End of Term Option You choose for an applicable Service Project, You shall also pay Provider costs it may incur in removing any liens on the Service Units created by Your actions or omissions or for preserving any Service Unit warranties that You requested. Upon Your payment of the FMV to exercise the Purchase Option, Provider shall immediately begin the transfer of its rights, title, and interest in the applicable Service Units to You on an AS IS, WHERE IS condition and free and clear of all liens and encumbrances. Upon completion of title transfer to You pursuant to any End of Term Option, Provider will have no further obligations or responsibilities with respect to the Service Units installed at the relevant Service Site. Default Events; Remedies
a.
b.
“Default by Provider” means (i) Our gross negligence, fraud, or material breach of any representation or stated obligation included in this Investor’-USA and any PA; or (ii) commencement of any bankruptcy, or a similar proceeding, by or against Us. “Default by Customer” shall occur if (i) You fail to make any and all payment amounts due and payable within fifteen (15) business days after such due date; (ii) You create such cause for a lien to be placed upon Our Service Unit(s); (iii) a commencement of any bankruptcy or other like proceedings occur by or against You; (iv) Your gross negligence, fraud, or material breach of any representation or obligation agreed to hereunder in this Investor’-USA or an applicable PA, including the right to properly possess and occupy the applicable Service Site(s). Remedies to Provider.
With the exception of failure to make payment when due, any other Default by Customer must be cured within forty-five (45) days of receipt of written notice from Provider or allowed a reasonable extension so long as You are demonstrating that You are diligently working on such cure. If You Fail to cure within said period, Provider may choose to (i) immediately terminate an applicable PA, and at Our option, any other PA’s and this Investor’-USA; (ii) enter the Service Site and remove the Service Unit(s) at Your sole cost, including all legal fees; (iii) exercise all other remedies available to Us by law; and (iv) immediately make due all unpaid Service Payments, and the Default Payment as defined in the applicable PA. Remedies to Customer. Customer shall provide written notice to Provider to any Default by Provider and Provider will have forty-five (45) day period to cure such default or allowed a reasonable extension so long as Provider is diligently attending to such cure. If Provider is unable to cure a default within the cure period or any extension, Customer shall allow Provider’s affiliates or assigns ‘Step-in’ rights to attempt to cure the default in Provider’s place and in a reasonably allowable time. For clarification, notwithstanding Section 16 of this
c.
d.
- CONFIDENTIAL -
3 Investor’s-USA, in case of a commencement of any bankruptcy, or a similar proceeding, by or against the Provider that is not cured pursuant to this Section 9, assigns under Section 16 of the Investor’s-USA may, within 10 days of the end of the cure period, step into the Provider's position under this Investor’s-USA by providing a written notice to Customer, and be assigned all obligations in addition to all rights under it. This assignment of all rights and obligations under the Investors’-USA shall be considered a cure as to the Default by Provider. If the default is cured, this Investor’s-USA and applicable PA shall remain in force and effect and Customer shall continue making Service Payments without waiver or setoff. If Provider, or its affiliates or assigns, fails to cure such default within the cure period or extension, Customer may choose to either; (i) have Provider continue to provide and maintain the Service Unit(s) to comply with the Performance Verification and continue making Service Payments, or (ii) purchase all Service Units by paying to Provider the Default Settlement Cost stated in Table 5 of the applicable PA. Upon receipt of payment, Provider will immediately cause to convey transfer of title to the Service Unit(s) to You, AS IS, WHERE IS.
10. Site Access
During the Initial Term and any Extension Term, during regular and/or reasonable business hours and upon no less than one (1) business day notice, Customer shall allow and/or diligently assist Provider and/or its designated service partners complete access to the Service Site(s) and specifically to everywhere the Service Units will be or are installed, in order that Provider can install, maintain, and/or, where applicable under the terms of this Investor’-USA, remove the Service Unit(s). Provider shall follow the procedures of entry provided by Customer and further described in each PA. You agree that preventing or unreasonably delaying site access to Us in order to carry out our obligations or exercise our rights under this Investor’- USA and any PA will not constitute, or cause to create, a Default by Provider.
11. Subordination and Non-Disturbance
When applicable and upon reasonable request from Us, you agree to obtain and deliver to Us a subordination and non-disturbance agreement ("SNDA") from any third party who now has or may in future obtain an interest in the Service Site, including, without limitation, any lenders, which (i) acknowledges and consents to Our right to Site Access hereunder in connection with the Service Site, and (ii) agrees not to disturb Our right to Site Access and rights hereunder in any manner in connection with any foreclosure proceeding or other actions pursued by such third party. In such SNDA, We will subordinate this Investor’-USA to the rights of any existing or future lenders.
12. Payment Provisions; Late Fees
All Service Payments will be paid monthly from Your designated bank account using Automated Clearing House (“ACH”) to be credited to Our designated bank account that We will provide to You, or other customary and acceptable method of payment by mutual agreement, and to be transacted on the due date of each Service Payment (the “Service Payment Date”) commencing on a date approximately 25-30 days after Our receipt of the signed Customer Acceptance, the AAC, and continuing on the same day of every month thereafter. Invoices for Service Payments will be sent to Customer electronically (email) and/or by regular mail at least twenty-five (25) days in advance of each Service Payment Date. If Provider has not received the Service Payment within five (5) business days of the Service Payment Date, You will be charged a late fee at the rate of one and one-half percent (1.5%) per month beginning on the day immediately following the Service Payment Date (compounding monthly), or the maximum allowable by law, whichever is less, until all payments then due are received.
13. Authorization to Use Only
We allow You to operate, where applicable, any Service Unit(s) in accordance with normal industry standards and at Our specifications and directions. Unless authorized by Us, You may not move or transfer any Service Unit(s) from the Service Site installed location. The Parties agree that the Service Unit(s) is/are deemed to be in Customer’s care while at the Service Site(s). While any Service Unit is at the Service Site, Customer shall be responsible for competently protecting such Unit from damage, modification, vandalism, interference, or destruction (excluding any damage, modification, or destruction solely and to the extent caused by Us or defect in the Service Unit itself), ensuring interconnected systems are performing reliably, safely, and effectively with related services not adversely impacting Service Unit performance.
14. Provider Implementation Standards
We will select and rely upon the services only of properly licensed Contractors/Installers who may be allowed to use properly licensed third party “Subcontractors” in the performance of its obligations. We shall ensure that work completed meets all local codes and follows all manufacturer warranty requirements and accepted industry standards for the installation and maintenance of the Service Unit(s). Provider and any Subcontractors will be properly insured and will facilitate the receipt of and compliance with all required permits and approvals (collectively “Permits”) necessary to install and maintain the Service Unit(s) and Site Services being provided at the Service Site.
15. Insurance
Each Party shall maintain appropriate insurance. Should the Customer not obtain and maintain (as primary insurance for Us and Customer as co-insureds as their interests may appear in this Investor’-USA) reasonable insurance coverage, including, liability insurance and insurance against loss or damage to the Unit(s), in such amounts and coverages, in such form and with such insurers as are reasonably satisfactory to Us and that will name Us, its successors and/or assigns, as loss payee and additional or co-insured with a certificate evidencing the same as to each policy, We shall have the right to obtain such insurance while the Service Unit(s) is/are at the Service Site and, to the extent not prohibited under applicable Laws, and add its pro-rated cost to the Service Payments due to Us. The applicable certificates of insurance will expressly provide that the Customer’s policies may not be terminated or significantly modified without giving Us at least 30 days prior Notice.
16. Assignment
We may, by providing written notice but without requiring Your consent, assign Our rights, but not Our obligations, under this Investor’s-USA and any PA, to a secured creditor or other financing party having the financial capacity to perform its obligations herein. Any such assignment of Our rights, however, shall not diminish Your benefits from the Service Unit(s) or Site Services provided for nor shall it infringe or change any economic terms of this Investor’-USA and any PA. You shall not be allowed to assign Your rights or obligations under the Investors’-USA and any PA without Our prior written consent in each case, such consent not being unreasonably withheld or delayed.
17. Notices
Any notice required by, or a communication made under, this Investor’-USA and any PA must be in writing and delivered to the Party as specified below (or other designate as provided in writing by a Party) and shall reference this Investor’s-USA and any PA by number. Notices will be considered received
- CONFIDENTIAL -
4 (i) two (2) hours following delivery by electronic mail, or (ii) when delivered to the authorized representative of the Party by certified mail or other courier service. You are required to promptly notify Provider regarding any change in Your legal name, location, contact information, executive leadership, applicable bank information and any material change to Your businesses and financial performance.
If Notice to Provider: If Notice to Customer:
Contact Name: Investor’s Contact Name:
Address: 555 Investor’s street Address:
Email Address: Email Address:
18. Representations and Warranties by Customer
Customer hereby represents that You have authority to enter into this Investor’-USA and any PA, no other official or other third-party approval is required, all terms and conditions of this Investor’-USA and any PA are enforceable against You, and that there are no legal actions or proceedings threatened or commenced against You that would impair Your ability to perform your obligations hereunder, including Your ability to pay Provider.
You also warrant that (i) the Service Site(s) is appropriate for performing the Service project and You are the legal and beneficial owner of the Service Site, or if not the owner, You have obtained all necessary permissions, consents, rights, and/or waivers from all owners of the Service Site to have Provider perform the Service Project at the Service Site, and (ii) Your representations made in this Investor’-USA and any PA, or in connection with this Investor’-USA and PA, given to Us by You or Your representatives are true and contains no misleading facts or other omissions contrary to Your representations. If unavailable to Us publicly or otherwise, You agree to provide Us with reasonable financial information upon request, including but not limited to annual reviewed (or audited, if available) financial statements and quarterly or interim financial statements, disclosure of material negative events and any other documents reasonably requested by Us that are readily available to You to maintain an understanding of Your financial condition. You agree to cooperate with Us in preparing applications for and securing all applicable permits, approvals and registrations with any Governmental Authority related to construction and installation of any Service Units, including, without limitation, timely executing and delivering all documentation required from You relating thereto. You shall designate Us as Your agent in obtaining all permits, approvals, registrations and additional authorizations required hereunder, as full as permitted by law, and shall cooperate in good faith to minimize any delays in installation.
19. Customer Accepted Risk
Other than expressly set forth herein, Provider shall not be liable for any direct, indirect, or consequential expenses, claims, damages, delays to the Service Unit(s), nor in the performance of Site Services and executing any Performance Corrections that arise from any of the following (“Customer Accepted Risk Event”):
a.
b.
c.
d.
e.
f.
g.
a force majeure event or any emergency or casualty event or circumstance beyond Our reasonable control or without Our gross negligence.
damage to or destruction of the Service Unit(s), except when caused from material defects fully covered under manufacturers’ warranties, or as the result of Our actions or inactions.
Your use and operation of the Service Unit(s) outside the terms provided for by Us in this Investor’-USA and applicable PA. changes to conditions at the Service Site occurring after the Effective Date of an applicable PA. Your breach of any provisions of this Investor’s-USA and any PA, Your gross negligence or fraud. the presence of any toxic substances or hazardous materials at a Service Site that have not been introduced by Provider or its agents. the operational failure of any Customer equipment directly or not directly connected to the Service Unit(s) but that impacts the operation of them. Should We dispatch a contractor or service technician for a warranty claim or standard service, either labor and/or material, and the event proves to be outside of the labor and/or material warranty or service scope, You will be billed for a service call at no less than the minimum service call rate in effect. Should You request that We complete the work that has been identified outside the scope of warranty or service, We will provide You a quote to complete the service work. If the quote is acceptable to You, You shall agree to it in writing and will be responsible for full payment within thirty (30) days of completion of the service work. any exclusions in the scope of service as detailed in a PA. h.
You shall continue paying the Service Payment, otherwise being due, throughout the duration of the operational impairment incurred as a result of any Customer Accepted Risk Event. Notwithstanding the foregoing, (i) Customer shall not be obligated to make Service Payments, a non-interest accruing forbearance, during periods in which the Service Unit(s) is completely unavailable for Customer use due to Provider’s gross negligence, will full misconduct, or regulatory non-compliance; and (ii) upon the occurrence and during the continuance of a Customer Accepted Risk Event, You may elect to terminate the applicable PA and pay Us the Early Termination Cost, if available in the PA, less any insurance proceeds actually received by Us as a result of a Customer Accepted Risk Event, upon which We will immediately cause to convey transfer of title to the Service Unit(s) to You, AS IS, WHERE IS.
20. Confidentiality
All non-public, confidential or proprietary information disclosed by a Party that the other Party receives knowing, or reasonably should know, of its confidentiality, including the nature and terms and condition of this Investors’-USA and any PA, is and shall remain the sole property of the disclosing Party. The other Party agrees that it will not disclose the confidential information or use it except as necessary to perform its obligations hereunder, to the extent disclosure is required under applicable public records or open-government laws, or to facilitate financing of the Service Unit(s). In the event of a violation by either Party, the disclosing Party shall be entitled to injunctive relief and specific performance thereof.
- CONFIDENTIAL -
5 21. Waivers
Customer and Provider hereby agree to the following waivers and related provisions:
a. Property Damage: Customer and Provider, including Provider’s agents, contractors and subcontractors, waive all claims and other rights they may have against each other for loss of and/or damage to (i) the Site Services, including all materials, machinery, equipment, and other items used in accomplishing the Site Services and/or to be incorporated into the Site services, while the same are in transit, at the Service Site, during erection, and otherwise, and (ii) all property owned by or in the custody of Customer and its affiliates, however such loss or damage shall occur, except the rights each Party has to the proceeds of such insurance held by Provider or Customer in accordance with Section 15. Subrogation: Customer and Provider, including Provider’s agents, contractors and subcontractors, shall have their respective insurers waive all rights of subrogation they may have against one another for claims arising thereunder. If any of the policies of insurance referred to in Section 15 require an endorsement to provide for continued coverage where there is a waiver of subrogation, the parties will cause them to be so endorsed. Consequential Damages: Neither Party nor any of its officers, directors, Subcontractors, employees or Affiliates of any of them shall be liable to the other Party, whether in contract, tort, negligence, indemnity, strict liability or otherwise, for any special, punitive, exemplary, indirect, incidental or consequential damages in connection with or arising out of the Site Services or the performance, non-performance or breach of the Investor’-USA; provided that nothing contained in this Section 21 (c.), or in any other provision of the Investor’-USA shall be construed to limit either Party’s damages, obligations, and liabilities with respect to the following: (i) indemnification obligations under Section 22 or otherwise pursuant to the Investor’-USA, (ii) to the extent covered by insurance required to be procured pursuant to the Investor’-USA, or (iii) in respect of fraud, intentional misrepresentation, or intentional tort by a Party or any agents of such Party. The provisions of this Section 21 (c.) shall survive the termination of the Investor’-USA.
Limitation of Liability: With respect to any claims of Customer arising out of the breach of contract, negligence or other fault of Provider, it is understood that in entering the Investor’s-USA, Provider is not an insurer and that the amounts payable to Provider hereunder are based upon the Site Services performed, and the scope of liability as herein set forth and are unrelated to the value of Customer’s property or the property of others located in or about the Service Site. It is not Customer’s desire that the Investor’-USA provide for full liability of Provider and that if Provider should be found liable for loss or damage in connection with the Site Services and/or due to a breach of the Investor’-USA or other failure of service to Customer in any respect, Provider’s liability shall be limited to an amount equal to Provider’s investment in the aggregate, and that the provisions of this Section 21 (d.) shall apply if Customer’s loss or damage, irrespective of cause or origin, results directly or indirectly to person or property from performance or nonperformance of obligations imposed by the Investor’s-USA or from
negligence, active or otherwise, of Provider, its Contractors/Subcontractors, agents or employees, provided, however, if Provider has insurance coverage in effect in an amount greater than the limitation of liability amount set forth herein, to the extent that Customer is b.
c.
d.
entitled to recovery under such coverage, such recovery will be available to the full extent of such insurance coverage. In addition, the foregoing limitation of liability shall not apply to any claim to the extent related to or arising from the following on the part of Provider:
(a) intellectual property infringement, or misuse of intellectual property, except to the extent of any such infringement or misuse of intellectual property by Customer; (b) the violation of law or regulation, including without limitation, tax, employment, or environmental regulations; (c) fraud, gross negligence or willful misconduct; or (d) indemnification arising out of any third-party claims indemnifiable by Provider pursuant to its indemnification obligations hereunder. The provisions of this Section 21 (d.) shall survive the termination of the Investor’-USA.
22. Indemnification
Each Party will indemnify the other Party and each of its affiliates, directors, officers, employees and agents harmless from and against all damages, including but not limited to third party claims, to the extent arising out of the indemnifying Party’s breach of this Investor’-USA or any PA or the gross negligence or fraud of the indemnifying Party or its employees or agents.
23. Disclaimer
PROVIDER DOES NOT MAKE, AND HEREBY DISCLAIMS, ALL WARRANTIES OTHER THAN AS EXPRESSLY SET FORTH IN THIS INVESTOR’-USA OR THE APPLICABLE
PA, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE SERVICE UNIT(S).
24. Miscellaneous
a. This Investor-USA and the PAs form the entire agreement between the Parties, merging and superseding all prior communication, written or
oral, concerning the subject matter hereof and may only be amended in writing. If any term or provision in a PA contradicts this Investor’s-USA,
then the terms in the PA will govern.
No one-time waiver or forbearance by any one Party of the other Party’s obligations shall be deemed to be an agreement to waive or forbear with respect to any future obligations.
This Investors’-USA and all PAs shall be governed under the laws of the State of _____________, without regard to its conflicts of laws or principles. For public entity Customers, this Investor’-USA and all PAs shall be governed by the laws of the state in which the Customer is located,
and venue shall lie in such state.
Excluding the owner of the Service Unit(s), this Investor’-USA and PAs are for the sole benefit of the parties hereto and their respective successors and permitted assigns and nothing herein, express or implied, is intended to or shall confer upon any other person or entity any legal or equitable right, benefit, or remedy of any nature whatsoever.
All disputes arising out of or in connection with this Investor’s-USA and any PA shall be finally settled under the rules for expedited arbitration of
the American Arbitration Association and by a single arbitrator appointed in accordance with such rules. The decision of the arbitrator shall be final and binding upon the parties, enforced in any court of proper jurisdiction, and there shall be no appeal therefrom.
Notwithstanding the above, Customer may opt out of binding arbitration if prohibited by applicable law.
Provisions of this Investor’s-USA and PAs, which by their nature should apply beyond the Initial Term or the Extension Term, will remain in force
after any termination or expiration including, but not limited to; Your absolute obligation to make Service Payments and any other b.
c.
d.
e.
f.
- CONFIDENTIAL -
6 ________________________________________________
Authorized Signature
________________________________________________
Print Name
________________________________________________
Title
amounts owed to Provider, and all the provisions included in Sections 9(a.) and 9(b.), 10, 14, 19, and this Section 24. _____________________________________________
Authorized Signature
_____________________________________________
Print Name
_____________________________________________
Title
IN WITNESS WHEREOF, the Parties have hereto set their hands to this Investor’-USA and agree to all the terms and provisions listed above and hereinafter attached:
Customer Provider
- CONFIDENTIAL -
1 Project Addendum
This Project Addendum No. (this “PA”) dated as of this day of , 20 (this “PA Effective Date”) is made between Investor (“Provider”), located at ....................................................... and________________________________ (“Customer”, “You”, “Your”) located at attached to and made part of the Investor’ Utility Services Agreement number is
and dated , (the “Investor’-
USA”). Capitalized terms not otherwise defined in this PA shall have the meaning given them in the Investor-USA.
Customer owns____, leases
_, has a mortgage on____ the Service Site. Customer will work with Provider to facilitate the installation of the Service Units described herein at the Service Site. See paragraph in this PA titled, Procedures for Service Site Access Ingress and Egress, detailing Provider’s means of ingress and egress to the Service Site as well as the security and safety procedures that Provider must follow for such access. These access Provisions are to be followed by Provider for all installation, operation, and maintenance activity of the Service Unit(s) at the Service Site.
TABLE 1. SERVICE SITE AND BUSINESS TERMS
Service Site Address: Monthly Service Payment: Base Service Term:
$
(Plus applicable taxes.)
Months
Service Payments may be subject to adjustment as provided below:
1.)UNKNOWN CIRCUMSTANCE: The monthly Service Payment in the Table1may be adjusted during the period prior to the Customer Acceptance date to account for any increased or decreased costs discovered in connection with the installation of the Service Units at the Service Site whose costs were unknown and/or could not be determined prior to the start of the installation. If it is necessary for any Customer infrastructure and/or Service Unit adjustments or additions to occur in order to complete the installation, Provider will provide You with a detailed description of the Circumstance(s) present, the added or reduced costs associated with it, and the change in the Service Payment that will occur. Any modifications or changes proposed shall require Your approval, which approval shall not be unreasonably withheld. Provider may make minor changes in the design and installation consistent with the intent of the PA that do not involve an adjustment in the Service Payment or the installation schedule, so long as such changes do not materially and adversely affect the Service Project, the quality of the materials or equipment specified herein, or the performance of any materials, equipment or systems specified herein.
2.)ADVANCE PAYMENTS; ADVANCE INTEREST: Customer acknowledges that the ordering and delivery of any Service Unit(s) to the Service Site may require progress funding to selected contractors/suppliers and You herby agree that, if and when required prior to Customer executing the AAC for all Service Unit(s), Provider is authorized, up on receipt of Customer’s signed Exhibit A, “Authorization to Disburse Advances”, to advance funds on Customer’s behalf relating to payment for the Service Unit(s)to be ordered, delivered and installed at Customer’s Service Site (each an “Advance”). Interest on Advance(s) will accrue at an annual rate of percent( %)commencing on the date of each Advance and terminating upon Our receipt of Customer’s signed AAC. Upon receipt of Your signed AAC, all accrued interest will be added to Provider’s capital cost and the monthly Service Payment shall be adjusted to include repayment of interest on the Advance(s) over the Base Service Term. As an option, Provider shall invoice Customer beginning on the first day of the month following Provider’s initial Advance payment for interest accrued on all Advance payments made in the previous month, and then on the first day of each month there after for interest accrued on the same Advances and any new Advances made in each previous month. Upon Provider’s receipt of the AAC, interest on Advances will cease to accrue and Provider will invoice Customer for all accrued interest from the first day of the month in which the ACC is received, up to the day of the month Provider receives the signed ACC. Under this option, the Monthly Service Payment as stated herein will not be adjusted.
-
CONFIDENTIAL -
2 Customer Support
TABLE 2. SERVICES PROVIDED
Maintenance, Operation, Warranty
Enforcement
Service Type
Design, purchase, installation, set up,
commissioning, training and
instruction
Delivery of Services
Performance Verification
Description
Provider to design, purchase, install, set up and commission the Service Unit(s), and provide operational training and give any special instructions as may be required.
Provider shall deliver services as further described herein.
We shall verify the performance of all Service Unit(s) installed in accordance with and as further described in this PA.
Provider shall, in coordination with Customer as necessary, provide on-going maintenance for the Service Units and assure Service Unit performance to manufacturer specifications.
Throughout the Service Project Term and this PA, Provider shall be available on weekdays and during its normal business hours to receive Customer inquiries.
From the date Provider pays an Advance authorized by Customer and prior to Customer signing and delivering the AAC required under the Investor’-USA, if Customer defaults hereunder or, through no fault of Provider, terminates this Project Addendum or the Investor’- USA for any reason, then ON DEMAND, FOR VALUE RECEIVED, CUSTOMER HEREBY UNCONDITIONALLY PROMISES TO PAY Provider the aggregate unpaid principal amount of the Advance(s), together with any accrued but unpaid interest on any and all Advance amounts remaining unpaid hereunder from time to time. In addition, Customer agrees to pay Provider a charge of three percent (3%) of the total previously paid Advances, as a cost reimbursement to Provider for its underwriting, due diligence, and set up costs. Interest shall continue to accrue until full re-payment has been received by Provider.
Customer hereby grants to Provider a first priority security interest to the Service Unit(s), as its collateral, described in Table 3 herein.
Customer irrevocably authorizes Provider (and appoints Provider as Customer’s attorney-in-fact) to file and record any UCC-1 financing statements or other instruments Provider may deem necessary to perfect or exercise its rights with respect to any of the Service Unit(s).
Customer agrees to indemnify and hold harmless Provider, its agents, employees, and assigns (and, if requested by Provider, defend) from and against any liability, damage, or loss of any nature (including fines, forfeitures, penalties, settlements, and attorney’s fees), and claims of any nature arising out of the selection, manufacture, delivery, acceptance, rejection, use, maintenance, operation, ownership, return, or disposition of the collateral whether in contract or tort. Upon receipt of all funds described above, Provider’s security interest in the Service Unit(s) shall terminate.
-
CONFIDENTIAL -
3 Total
TABLE 3. SERVICE UNITS INSTALLED
Service Space (Location) Description of Service Unit(s) Power/Capacity (watts / BTUs / other)
No. of Service Unit(s) Installed
-
CONFIDENTIAL -
4 Procedures for Service Site Access Ingress and Egress. {To be provided by Customer, if applicable/necessary}
Early Termination Option. Unless otherwise approved in writing by Provider, the Early Termination Option is not available (“N/A”) prior to the _____ month of the Base Service Term of this PA, including in an event of a change of control under Section 7. of the ESA or in case of a Customer Accepted Risk Event under Section 19. of the ESA. Provided that You are not in default of this PA, the Investor’s-USA, or any other PA to the Investor’s-USA, You may elect to terminate this PA by paying an ‘Early Termination Cost’ as specified in the following Table 4 (less, if applicable, any insurance proceeds, salvage value, or other third-party compensation received by Provider for the Service Unit(s)).
Customer shall not be responsible for speculative, punitive, or indirect components of Early Termination Cost. Upon payment of the Early Termination Cost, Provider will transfer title to the Service Unit(s) to You free and clear of all liens and encumbrances on an ‘AS IS’, ‘WHERE IS’ basis.
TABLE 4. EARLY TERMINATION COST
Termination
Month
1 2
3 Termination
Cost
Termination
Month
31 32
33 Termination
Cost
Termination
Month
61 62
63 Termination
Cost
Termination
Month
91 92
93 Termination
Cost
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
64 65
66 67
68 69
70 71
72 73
74 75
76 77
78 79
80 81
82 83
84 85
86 87
88 89
90 94
95 96
97 98
99 100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
-
CONFIDENTIAL -
5 Default Payment. In the event of a Default by Customer as set forth in Section 9b of the Investor’s-USA and Provider elects to terminate this PA as provided in Section 9c of the Investor’s-USA, then in addition to all past due Service Payments, Customer shall pay to Provider, as liquidated damages and not as a penalty, a lump sum Default Payment equal to the sum of all remaining monthly Service Payments owed by Customer to Provider over the remaining Base Service Term. Default Settlement Cost/Non-Appropriation Cost. In the event of an uncured Default by Provider as set forth in Section 9. or an event of a Non-Appropriation occurrence as set forth in Section 7. of the Investor’s-USA, then in addition to all past due Service Payments, You may terminate this PA by paying to Provider the Cost as specified in the following Table 5. Upon receipt of payment, Provider will immediately transfer title to the Service Unit(s) to You free and clear of all liens and encumbrances on an ‘AS IS’, ‘WHERE IS’ basis.
TABLE 5. DEFAULT SETTLEMENT COST / NON-APPROPRIATION COST Termination
Month
1 2
3 4
5 6
7 8
9 10
11 12
13 Cost ($) Termination
Month
31 32
33 34
35 36
37 38
39 40
41 42
43 Cost ($) Termination
Month
61 62
63 64
65 66
67 68
69 70
71 72
73 Cost ($) Termination
Month
91 92
93 94
95 96
97 98
99 100
101
102
103
Cost ($)
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 44
45 46
47 48
49 50
51 52
53 54
55 56
57 58
59 60
74 75
76 77
78 79
80 81
82 83
84 85
86 87
88 89
90 104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
Service Unit Performance Corrections. If Provider becomes aware during the Base Service Term of a failure of any of the Service Units either through remote notifications via the Service Unit(s) or through Your written description of the circumstances, Provider will conduct an onsite or offsite inspection (“Service Unit Inspection”) of the relevant Service Site within 72 hours if not deemed an emergency, or within 24 hours if deemed an emergency, to determine the existence and level of such failure. If a failure is identified, Provider will subsequently remedy the issue using industry standard methods (a “Performance Correction”) within 10 working days and provide a written report of the work to You within the following 10 working days, provided however, in the event that the remedy will take longer than 10 working days and that Provider is demonstrating it is working to complete the Performance Correction, including the wait time for delivery of replacement parts, then Provider and Customer hereby agree to a reasonable extension to complete the Performance Correction.
Hazardous Materials. A “Hazardous Material” is any substance or material identified now or in the future as hazardous under any federal, state or local law or regulation, or any other substance or material that may be considered hazardous or otherwise subject to statutory
- CONFIDENTIAL -
6 Sign
Title
Print Name
Sign
Title
Print Name
or regulatory requirements governing handling, disposal and/or clean-up. If after the commencement of the Work, Hazardous Material is discovered at the Work site, Provider shall be entitled to immediately stop Work in the affected area. Provider shall report the condition to Customer and, if required, the government agency with jurisdiction. Customer shall be responsible for retaining any independent testing laboratory to determine the nature of the materials encountered and whether it is a Hazardous Material requiring corrective measures and/or remedial action. Such measures shall be the sole responsibility of Customer and shall be performed in a manner minimizing any adverse effects upon the Work. Provider shall resume Work in the area affected by any Hazardous Material only upon written agreement between the Parties after the Hazardous Material has been removed or rendered harmless and only after approval, if necessary, of the governmental agency or agencies with jurisdiction. If Provider incurs additional costs and/or is delayed due to the presence or remediation of Hazardous Material, Provider shall be entitled to an equitable adjustment in the Contract Price and/or the Project Schedule. Customer shall defend, indemnify and hold harmless Provider, and its Subcontractors, from and against any and all claims, damages, penalties, losses, expenses, and other liabilities, including attorney’s fees, arising out of or relating to the performance of the Work in any area affected by Hazardous Material. This provision shall survive the completion of the Work and/or any termination of the Investor’s-USA and this PA. Maintenance. The Provider shall maintain the Service Units during the Service Term in accordance with industry standards and manufacturers’ recommendations to keep the Service Units performing to manufacturers’ specifications.
Customer will cooperate in the development of any maintenance plan for the Service Units, which plan shall be used to coordinate the optimization, inspection and planned and/or unplanned maintenance. Maintenance will only be provided during the Service Term and for so long as Your account is in good standing. Provider shall be obligated to perform maintenance and/or Performance Corrections to the actual Service Unit(s) covered in this PA only and not to any other Customer owned equipment and infrastructure. Customer shall incur no cost for Service Unit(s) service, repairs and adjustments, provided, however, that when the need for maintenance or repairs principally arises due to the gross negligence of the Customer or its employees, agents, tenants, contractors or subcontractors, and we can reasonably demonstrate such causal connection, we may charge you for the actual cost of the maintenance or repair insofar as such cost is not covered by any warranty or insurance proceeds. Sales and Use Taxes. In the event that a taxing authority deems that sale or use taxes are due on the Service Payments, Provider will add the appropriate taxes to the Service Payment and remit such taxes to the relevant taxing authority. Personal Property Taxes. Personal Property Taxes are a business expense Provider will pass through to You at cost. We will provide You evidence of such taxation and debit Your account via ACH when due to the appropriate state or local taxing authority.
Insurance. You agree to include Service Unit(s) in your property insurance coverage including fire, theft, and extended coverage for the full replacement cost of the Service Unit(s) to the extent of Provider’s interest in such Service Unit(s), but with a minimum insured value of $350,000 in accordance with Section 14 of the Investor’s-USA. Miscellaneous. This PA exists independently of any other PA and may be executed in counterparts. No Party is authorized to waive or alter any term or condition of this PA. Additional Terms. The following terms shall have control over any conflicting terms in the Investor’s-USA and this PA:
Customer Provider
-
CONFIDENTIAL -
7 EXHIBIT A
AUTHORIZATION TO DISBURSE ADVANCES
CUSTOMER:
BY:
PRINT NAME:
TITLE:
ENTITY AMOUNT OF
ADVANCE
*Please insert the date Customer authorizes PROVIDER to make each Advance. **Please initial each Advance.
DATE OF
AUTHORIZATION
TO MAKE
ADVANCE*
CUSTOMER
INITIALS**
Pursuant to this PA and the INVESTOR’S-USA dated as of , 20 by and between (“Customer”) and the Investor Utility Services (“Provider”), Customer hereby authorizes and directs Provider to pay the Advance(s) indicated below to the applicable entity. CUSTOMER HEREBY CONFIRMS THAT CUSTOMER IS
UNCONDITIONALLY APPROVING THE ADVANCE PAYMENT(S) BY PROVIDER TO THE ENTITY(IES) LISTED
BELOW TO ACQUIRE CERTAIN EQUIPMENT AND/OR SERVICES ON BEHALF OF CUSTOMER IN ORDER TO PERFORM ITS OBLIGATIONS TO CUSTOMER UNDER THAT CERTAIN INVESTOR’S- USA AND THIS PA BETWEEN THE PARTIES. CUSTOMER FUTHER AGREES THAT IF CUSTOMER, THROUGH NO FAULT OF PROVIDER, FOR ANY REASON TERMINATES THE INVESTOR’s-USA AND/OR THIS PA OR OTHERWISE FAILS TO PROVIDE ITS WRITTEN ACCEPTANCE OF EQUIPMENT AS REQUIRED IN THE INVESTOR’s-USA, THEN ALL OF CUSTOMER’S OBLIGATIONS TO PROVIDER UNDER THIS PA AND THE INVESTOR’s-USA SHALL REMAIN
ABSOLUTE, UNCONDITIONAL AND NOT SUBJECT TO REDUCTION, SETOFF OR ABATEMENT FOR ANY REASON.
1. 2.
$
$
X
X
X
X
On behalf of EcoGreen, we thank the City of
Pinole for the opportunity!
GENERAL SERVICES AGREEMENT BETWEEN
THE CITY OF PINOLE AND ECOGREEN SOLUTIONS LLC.
Project: Public Safety Building and City Hall Lighting Upgrades This agreement for General Services (“Agreement”) is entered into on _________(the “Effective Date”) between the CITY OF PINOLE, a municipal corporation, with offices located at 2131 Pear Street, Pinole, California (“City”) and EcoGreen Solutions LLC (“Contractor”) (together sometimes referred to as the “Parties”).
Section 1. SERVICES. In accordance with the terms and conditions set forth in this Agreement, Contractor agrees to perform all services described in the Scope of Services, attached as Exhibit A, which is incorporated herein. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, this Agreement shall prevail.
1.1 Term of Services. This Agreement shall begin on the Effective Date and shall end one (1) year from the date this Agreement was signed by City, unless the term of the Agreement is otherwise terminated or modified, as provided for herein. If the performance of the Scope of Services extends beyond the one (1) year term of this Agreement, then the term of this Agreement shall be extended solely for and until completion of the Scope of Services.
1.2 Standard of Performance. Contractor shall diligently perform all services required in connection with this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Contractor is engaged in the geographical area in which Contractor practices its profession.
1.3 Assignment of Personnel. Contractor shall assign only competent personnel to perform services in connection with this Agreement.
1.4 Termination. City may cancel this Agreement at any time and without cause upon written notification to Contractor. In the event of termination, Contractor shall be entitled to compensation for services satisfactorily completed as of the date of written notice of termination; City, however, may condition payment of such compensation upon Contractor delivering to City documents and records identified in Section 10.1 of this Agreement.
Section 2. COMPENSATION. Contractor acknowledges City will not directly provide compensation for this project as it will be paid for through PG&E’s on-bill financing program. The current approved loan amount is subject to change depending on project scope amendments.
Section 3. CHANGES AND EXTRA SERVICES.
3.1 City shall not be liable for payment of any changes under Section 3.1, nor shall Contractor be obligated to perform any such changes, except upon such written amendment or supplement.
Section 4. PROJECT SITE. Contractor shall perform the Services in such a manner as to cause a minimum of interference with City’s operations and the operations of other contractors at each Project site and to protect all persons and property thereon from damage or injury. Upon completion of the Services at
a Project site, Contractor shall leave such Project site clean and free of all tools, equipment, waste materials and rubbish. Each Project site may include all buildings, offices, and other locations where Services are to be performed, including any access roads. Contractor shall be solely responsible for the safe transportation and packing in proper containers and storage of any equipment required for performing the Services, whether owned, leased or rented. City may assume that anything left on the work site an unreasonable length of time after said work is completed has been abandoned. Any transportation furnished by City shall be solely as an accommodation and City shall have no liability, therefore. Contractor acknowledges and agrees that it shall assume the risk and is solely responsible for its use of any City owned equipment and property provided by City for the performance of Services. City shall have no liability to Contractor, therefore. In addition, Contractor further acknowledges and agrees that it shall assume the risk and is solely responsible for its owned, non-owned and hired automobiles, trucks, or other motorized vehicles as well as any equipment, tolls, or other property which is utilized by Contractor on each Project site.
Section 5. INSURANCE REQUIREMENTS. Before beginning any work under this Agreement, Contractor, at its own cost and expense, shall procure the types and amounts of insurance listed below for the period covered by the Agreement.
5.1 Workers’ Compensation. If Contractor employs any person, Contractor shall maintain Statutory Workers’ Compensation Insurance and Employer’s Liability Insurance for any and all persons employed directly or indirectly by Contractor with limits of not less than One Million Dollars ($1,000,000.00) per accident.
5.2 Commercial General and Automobile Liability Insurance. Contractor shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not less than Two Million Dollars ($2,000,000.00) per occurrence, combined single limit coverage for risks associated with the work contemplated by this Agreement. Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Agreement, including the use of owned and non-owned automobiles. The City shall be named as an additional insured and insurance shall provide primary coverage with respect to the City by written endorsement to the policy.
5.3 General Liability/Umbrella Insurance. The coverage amounts set forth above may be met by a combination of underlying and umbrella policies so long as in combination the limits equal or exceed those stated.
5.4 Professional Liability Insurance. (Required for all Licensed Contractors performing design work) Contractor shall maintain professional liability insurance for licensed professionals performing work in connection with this Agreement in an amount not less than One Million Dollars ($1,000,000.00) covering the licensed professionals’ errors and omissions. Any deductible or self-insured retention shall not exceed Two Hundred Fifty-Thousand Dollars ($250,000.00) per claim.
5.5 All Policies Requirements.
5.5.1 Verification of Coverage. Prior to beginning any work under this Agreement, Contractor shall, at the sole option of the City, provide City with (1) certified
Certification of Insurance that demonstrates compliance with all applicable insurance provisions contained herein; and (2) upon request by the City, complete certified copies of all policies and/or complete certified copies of all endorsements that demonstrate compliance with this Section 5.
5.5.2 Notice of Reduction in or Cancellation of Coverage. A certified endorsement must be attached to all insurance obtained in accordance with this Agreement stating that coverage shall not be suspended, voided, canceled by either party, or reduced in coverage or in limits, except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City.
5.6 Waiver of Subrogation. Contractor agrees to waive subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all work performed by Contractor, its employees, agents, and subcontractors.
Section 6. INDEMNIFICATION AND CONTRACTOR’S RESPONSIBILITIES.
6.1 Contractor shall to the fullest extent allowed by law, with respect to all services performed in connection with this Agreement, indemnify, defend, and hold harmless the City and its officials, commissioners, officers, employees, agents, and volunteers from and against any and all claims that arise out of, pertain to or relate to the negligence, recklessness or willful misconduct of the Contractor. Contractor will bear all losses, costs, damages, expense and liability of every kind, nature and description that arise out of, pertain to, or relate to such Claims, whether directly or indirectly (“Liabilities”). Such obligations to defend, hold harmless and indemnify the City shall not apply to the extent that such Liabilities are caused by the sole negligence, active negligence, or willful misconduct of the City.
Section 7. STATUS OF CONTRACTOR. At all times during the term of this Agreement, Contractor shall be an independent contractor and shall not be an employee of City. Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent.
Section 8. LEGAL REQUIREMENTS.
8.1 Governing Law. The laws of the State of California shall govern this Agreement.
8.2 Compliance with Applicable Laws. Contractor and any subcontractors shall comply with all laws applicable to the performance of the work in connection with this Agreement.
8.3 Licenses and Permits. Contractor represents and warrants to City that Contractor and its employees, agents, and any subcontractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions.
8.4 Nondiscrimination and Equal Opportunity. In compliance with federal, state, and local laws, Contractor shall not discriminate on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, marital status, sex, or sexual orientation, against any employee, applicant for employment,
subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Contractor under this Agreement.
8.5 Work Requiring Payment of Prevailing Wages. In accordance with California Labor Code § 1771 et. seq., not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which these services are to be performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in the California Labor Code shall be paid to all workers engaged in performing the services under this Agreement. Contractor shall also comply with all other applicable sections of the California Labor Code, regarding use of the Department of Industrial Relations (“DIR”) prevailing wage standards and registration requirements.
Where the prevailing wage for service occupations is posted by the DIR, then Contractor is required to pay its employees the posted prevailing wage.
Section 9. MODIFICATION.
9.1 Amendments. The Parties may amend this Agreement only by a writing signed by all the Parties.
9.2 Assignment. Contractor may not assign this Agreement or any interest therein without the prior written approval of the City.
9.3 Subcontracting. Contractor shall not subcontract any portion of the performance contemplated and provided for herein without prior written approval of the City. Where written approval is granted by the City, Contractor shall supervise all work subcontracted by Contractor in performing the Services; shall be responsible for all work performed by a subcontractor as if Contractor itself had performed such work; the subcontracting of any work to subcontractors shall not relieve Contractor from any of its obligations under this Agreement with respect to the Services; and Contractor is obligated to ensure that any and all subcontractors performing any Services shall be fully insured in all respects and to the same extent as set forth under Section 5, to City’s satisfaction.
9.4 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City and Contractor shall survive the termination of this Agreement.
9.5 Options upon Breach by Contractor. If Contractor materially breaches any of the terms of this Agreement, City’s remedies shall include, but not be limited to, the following:
9.5.1 Immediately terminate the Agreement.
9.5.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Contractor in accordance with this Agreement;
9.5.3 Retain a different Contractor to complete the Services not finished by Contractor; or
9.5.4 Charge Contractor the difference between the costs to complete the work at the time of breach and the amount that City would have paid Contractor in accordance with Section 2 if Contractor had completed the Work.
Section 10. KEEPING AND STATUS OF RECORDS.
10.1 Records Created as Part of Contractor’s Performance. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Contractor prepares or obtains in accordance with this Agreement and that relate to the matters covered under the terms of this Agreement shall be the property of the City. Contractor hereby agrees to deliver those documents to the City upon termination of the Agreement.
It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the City and are not necessarily suitable for any future or other use. City and Contractor agree that, until final approval by City, all data, plans, specifications, reports, and other documents are confidential and will not be released to third parties without prior written consent of both Parties.
10.2 Contractor’s Books and Records. Contractor shall maintain any and all records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the City under this Agreement for a minimum of three (3) years, or for any longer period required by law, from the date of final payment to the Contractor to this Agreement.
10.3 Confidential Information and Disclosure. During the term of this Agreement, either party (the “Disclosing Party”) may disclose confidential, proprietary or trade secret information (the “Information”), to the other party (the “Receiving Party”). The Receiving Party shall hold the Disclosing Party’s Information in confidence and shall take all reasonable steps to prevent any unauthorized possession, use, copying, transfer, or disclosure of such Information. Contractor understands that City is a public City and is subject to the laws that may compel it to disclose information about Contractor’s business.
Section 11. WARRANTY.
11.1 In addition to any and all warranties provided or implied by law or public policy, Contractor warrants that all Services (including but not limited to all equipment and materials supplied in connection therewith) shall be free from defects in design and workmanship, and that Contractor shall perform all Services in accordance with all applicable engineering, construction and other codes and standards, and with the degree of high professional skill normally exercised by or expected from recognized professional firms engaged in the practice of supplying services of a nature similar to the Services in question. Contractor further warrants that, in addition to furnishing all tools, equipment and supplies customarily required for performance of work, Contractor shall furnish personnel with the training, experience and physical ability, as well as adequate supervision, required to perform the Services in accordance with the preceding standards and the other requirements of this Agreement. In addition to all other rights and remedies which City may have, City shall have the right to require, and Contractor shall be obligated at its own expense to perform, all further services which may be required to correct any deficiencies which result from Contractor’s failure to perform any Services in accordance with the standards required by this Agreement. Moreover, if, during the term of this Agreement (or during the one (1) year period following the term hereof), any equipment, goods or other materials or Services used or provided by Contractor under this Agreement fail due to defects in material and/or
workmanship or other breach of this Agreement, Contractor shall, upon any reasonable notice from City, replace or repair the same to City's satisfaction. Unless otherwise expressly permitted, all materials and supplies to be used by Contractor in the performance of the Services will be rental equipment and not be new. Warranty for rental equipment and related services is only valid during the rental period.
11.2 Contractor hereby agrees to assign to City all additional warranties, extended warranties, or benefits like warranties, such as insurance, provided by or reasonably obtainable from suppliers of equipment and material used in the Services.
Section 12. HEALTH AND SAFETY PROGRAMS. The Contractor shall establish, maintain, and enforce safe work practices, and implement an accident/incident prevention program intended to ensure safe and healthful operations under their direction. The program shall include all requisite components of such a program under Federal, State, and local regulations and shall comply with all City site programs.
12.1 Contractor will be responsible for acquiring job hazard assessments as necessary to safely perform all duties of each Project and provide a copy to City upon request.
12.2 Contractor will be responsible for providing all employee health and safety training and personal protective equipment in accordance with potential hazards that may be encountered in performance of Project and provide copies of the certified training records upon request by City. Contractor shall be responsible for proper maintenance and/or disposal of their personal protective equipment and material handling equipment.
12.3 Contractor is responsible for ensuring that its lower-tier subcontractors are aware of and will comply with the requirements set forth herein.
12.4 City, or their representatives, shall periodically monitor the safety performance of the Contractor working on the Project. All Contractors and their subcontractors shall be required to comply with the safety and health obligations as established in the Agreement.
Non-compliance with safety, health, or fire requirements may result in cessation of work activities, until items in non-compliance are corrected. It is also expressly acknowledged, understood, and agreed that no payment shall be due from City to Contractor under this Agreement at any time when, or for any Services performed when, Contractor is not in full compliance with this Section 10.
12.5 Contractor shall immediately report any injuries to the City site safety representative.
Additionally, the Contractor shall investigate and submit to the City site safety representative copies of all written accident reports, and coordinate with City if further investigation is requested.
12.6 Contractor shall take all reasonable steps and precautions to protect the health of their employees and other site personnel with regard to their Scope of Services. Contractor shall conduct occupational health monitoring and/or sampling to determine levels of exposure of its employees to hazardous or toxic substances or environmental conditions.
Copies of any sampling results will be forwarded to the City site safety representative upon request.
12.7 Contractor shall develop a plan to properly handle and dispose of all hazardous waste they generate within the Scope of Services.
12.8 Contractor shall advise its employees and subcontractors that any employee who jeopardizes his/her safety and health, or the safety and health of others, may be subject to actions including removal from Project.
12.9 Contractor shall, at the sole option of the City, develop and provide to the City a Hazardous Material Spill Response Plan that includes provisions for spill containment and clean-up, emergency contact information including regulatory agencies and spill sampling and analysis procedures. Hazardous Materials to include diesel fuel used for trucks owned or leased by the Contractor.
Section 13. MISCELLANEOUS PROVISIONS.
13.1 Attorneys’ Fees. If a Party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing Party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that Party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.
13.2 Venue. In the event that either Party brings any action against the other under this Agreement, the Parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of Contra Costa or in the United States District Court for the Northern District of California.
13.3 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.
13.4 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement.
13.5 Contract Administration. This Agreement shall be administered by the City Manager or her designee, who shall act as the City’s representative. All correspondence shall be directed to or through the City Manager
13.6 Notices.
Any written notice to Contractor shall be sent to:
__________
Any written notice to City shall be sent to:
City of Pinole
Naomi Kelly, City Manager2131 Pear Street
Pinole, CA 94564
With a copy to:
Eric Casher, City Attorney
2131 Pear Street
Pinole, CA 94564
13.7 Professional Seal. Where applicable in the determination of the City, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation.
13.8 Integration; Incorporation. This Agreement, including all the exhibits attached hereto, represents the entire and integrated agreement between City and Contractor and supersedes all prior negotiations, representations, or agreements, either written or oral. All exhibits attached hereto are incorporated by reference herein.
13.9 Alternative Dispute Resolution. If any dispute arises between the Parties that cannot be settled after engaging in good faith negotiations, City and Contractor agree to resolve the dispute in accordance with the following:
Each Party will designate a senior management or executive level representative to negotiate the dispute. Through good faith negotiations, the representatives will attempt to resolve the dispute by any means within their authority. If dispute remains unresolved after fifteen (15) days of good faith negotiations, the Parties shall attempt to resolve the disagreement by mediation through a disinterested third person as mediator selected by both Parties. Mediation will begin within thirty (30) days of the selection of this disinterested third party and will end fifteen (15) days after commencement unless the parties agree to an extension. The Parties shall equally bear the costs of any third party in any alternative dispute resolution process.
The alternative dispute resolution process is a material condition to this Agreement and must be exhausted as an administrative remedy prior to either Party initiating legal action.
This alternative dispute resolution process is not intended to nor shall be construed to change the time periods for filing a claim or action specified by Government Code § 900, et. seq.
13.10 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.
The Parties have executed this Agreement as of the date signed by the City.
CITY OF PINOLE EcoGreen Solutions LLC
Naomi Kelly, City Manager
Date: Date:
Approved as to Form:
Eric Casher, City Attorney
Date:
Attested By:
Heather Bell, City Clerk
Date:
EXHIBIT A
SCOPE OF SERVICES AND FEE SCHEDULE
CITY COUNCIL
REPORT 10.B.
DATE: NOVEMBER 3, 2026
TO: MAYOR AND COUNCIL MEMBERS
FROM: Lilly Whalen, Community Development Director, 510-724-9832, [email protected]
Kapil Amin, Sustainability Project Manager, N/A, [email protected] SUBJECT: PUBLIC HEARING AND PG&E ON-BILL FINANCING APPROVAL FOR LED LIGHTING RETROFIT AT PINOLE CITY HALL (2131 PEAR ST./APN:
401163004) AND PINOLE PUBLIC SAFETY BUILDING (880 TENNENT AVE/APN: 401164003), AND AUTHORIZATION FOR CITY MANAGER TO
EXECUTE DOCUMENTATION
RECOMMENDATION
Staff recommends that the City Council:
• Conduct a public hearing pursuant to Government Code Section 4217. • Adopt the Resolution (Attachment A):
o Approving a zero-interest PG&E On-Bill Financing (OBF) contract (page 41-44 of Attachment B) for the LED lighting retrofit project at City Hall and the Public Safety Building and
o Designating the City Manager as the authorized signatory for the OBF finance contract and all associated documents.
A companion staff report covers the Energy Services Contract with EcoGreen Solutions LLC.
This item pertains only to the financing mechanism, not the contract for construction.
BACKGROUND
EcoGreen Solutions LLC performed a no-cost energy audit in 2025 identifying opportunities to reduce municipal energy use (Attachment B). The City’s due-diligence process—meetings with PG&E, analysis of projected bill impacts, and conversations with other jurisdictions who have used EcoGreen and OBF—found no fiscal or operational concerns.
The City elected to begin with a pilot financing agreement covering City Hall and the Public Safety Building, which share an electrical meter and represent the majority of lighting-related savings. PG&E reviewed and approved the City’s OBF application for this scope.
The Energy Services Contract for the LED retrofit work is being considered under a separate agenda item. This report addresses only the financing mechanism.
REVIEW AND ANALYSIS
PG&E’s On-Bill Financing Program (OBF)
PG&E's OBF Program provides 0% interest, no-fee loans to public agencies to install eligible energy-efficiency measures. Approved loan payments appear directly on the City’s PG&E bill and are designed to be offset by energy savings, making upgrades budget-neutral or cost-positive. There are no upfront capital costs to the City.
Under this item, the City would enter into a finance agreement with PG&E for the LED retrofit project as scoped and approved by PG&E.
Energy Savings and Loan Performance
• Estimated monthly electricity cost savings: $1,663.71 • Estimated OBF monthly loan payment: $1,644.32
• Payback period: 9.72 years
• Net monthly benefit: Positive from Year 1
PG&E’s approval is based on conservative assumptions to ensure savings exceed payments.
Government Code Section 4217 Requirements
Gov. Code §4217 allows public agencies to approve energy financing contracts without competitive bidding when the governing body finds that:
• The anticipated savings exceed the financing costs; and • The contract is in the public interest.
This report provides the basis for these findings, which are incorporated into the accompanying resolution.
FISCAL IMPACT
There is no upfront capital cost to the City. Loan repayment is made through the City’s monthly PG&E bill, offset by energy savings. This creates a net-neutral or cost-positive fiscal outcome.
ATTACHMENTS
A. Resolution
B. EcoGreen Solutions Presentation
RESOLUTION NO. 2026-XX
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE,
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA,
PURSUANT TO GOVERNMENT CODE SECTION 4217, APPROVING A FINANCE CONTRACT THROUGH ZERO‑INTEREST PG&E ON‑BILL FINANCING (OBF) FOR
LED LIGHTING RETROFITS AT CITY HALL AND THE PUBLIC SAFETY BUILDING
AND DESIGNATING THE CITY MANAGER AS THE AUTHORIZED SIGNATORY WHEREAS, the City of Pinole seeks to reduce energy consumption and operational costs through energy‑efficiency improvements at City Hall and the Public Safety Building; and
WHEREAS, EcoGreen Solutions LLC conducted an energy audit and identified the LED lighting retrofit project as a cost‑effective measure with measurable utility savings; and
WHEREAS, the City applied to PG&E’s zero‑interest On‑Bill Financing (OBF) Program, which provides repayment of qualifying energy‑efficiency upgrades directly through the utility bill at no interest and with no upfront cost; and WHEREAS, PG&E has approved the City’s loan application for the LED lighting retrofit at City Hall and the Public Safety Building; and WHEREAS, the projected energy cost savings associated with the retrofit exceed the proposed monthly loan payments, meeting the requirements of Government Code Section 4217.12; and
WHEREAS, the City Council conducted a public hearing on November 3, 2026, to consider the OBF finance contract and receive public comment.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pinole hereby resolves as follows:
SECTION 1: The recitals above are true and correct and hereby made a part of this Resolution.
SECTION 2: Findings Under Government Code §4217
1. The anticipated energy cost savings resulting from the lighting retrofit exceed the costs of the proposed PG&E OBF finance contract.
2. Entering into the finance contract is in the best interest of the City.
SECTION 3: Approval of OBF Finance Contract. The City Council approves the PG&E On‑Bill Financing (OBF) finance contract for LED lighting retrofits at City Hall and the Public Safety Building. The City Manager is authorized to execute the OBF contract and all related documents, and to take actions necessary to implement the financing.
SECTION 4: Implementation. The City Manager and staff are directed to coordinate with PG&E to complete the financing and ensure proper integration of loan repayment into the City’s utility billing.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Pinole held on the 3rd day of November, 2026, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
I hereby certify that the foregoing resolution was regularly introduced, passed, and adopted on the 3rd day of November, 2026.
___________________________________
Heather Spears, CMC
City Clerk
City of Pinole
EcoGreen Solutions INC.
2131 Pear Street,
Pinole, CA 94564
Prepared by:
27671 La Paz Road, Suite 100, Laguna Niguel, CA 92677
CUSTOMER INFORMATION
Customer Name
City of Pinole
Electric Service Account No.
City Hall: 527600364
Fernandez Park: 6069113784
Fire Station 74: 6317540399
Fire Station 73 & Police Department: 1196945891
Old Town Public Parking Lot 1:
Old Town Public Parking Lot 2: -
612 Tennent Ave Parking Lot: -
Beauty & Grace Salon Parking Lot: 1048223998
Guillermo Recoder Parking Lot: -
La Casita Bilingue Montessori School Parking Lot: -
Pinole Farmers Market Parking Lot: 9465139366, 4840156501 Sue’s Place Parking Lot: -
Youth Center & Playhouse: 9527530591, 7069113482, 839890612 Senior Center: 9845996180
Tiny Tots & Swim Center: 3735045069
WWTP: 1400573329
Customer Contact
Kapil Amin
Title
Sustainability Project Manager
Customer Address
City Hall: 2131 Pear St
Fernandez Park: 595 Tennent Ave
Fire Station 74: 3700 Pinole Valley Rd
Fire Station 73 & Police Department: 880 Tennent Ave
Old Town Public Parking Lot 1: 2180 Prune St
Old Town Public Parking Lot 2: 2401 San Pablo Ave
612 Tennent Ave Parking Lot: 612 Tennent Ave
Beauty & Grace Salon Parking Lot: 647 Tennent Ave
Guillermo Recoder Parking Lot: 2548 San Pablo Ave # E
La Casita Bilingue Montessori School Parking Lot: 592 Tennent Ave Pinole Farmers Market Parking Lot: 798 Fernandez Ave
Sue’s Place Parking Lot: 2265 Pear St
Playhouse: 601 Tennent Ave
Senior Center: 2500 Charles Ave
Tiny Tots & Swim Center: 2454 Simas Ave
Youth Center: 635 Tennent Ave
WWTP: 11 Tennent Ave
City, State
Pinole, CA
Telephone
510-372-0989
E-Mail
[email protected]
Phase 1: On Bill Financing
Summarized Energy Action Plan
Table 1.1 A summary of the recommendations at each site along with the related savings Location Energy Efficiency Measure
Electricity Usage Savings Cost Savings Preliminary Estimated Implementation Cost Payback Period
[kWh/yr] [$/yr] [$] [yrs]
Parking Lot - Pinole Farmers Market Upgrade existing lighting with LED lighting 2,391.00 $1,074.85 $7,648.11 7.1 Parking Lot - Beauty & Grace Salon Upgrade existing lighting with LED lighting 1,515.00 $719.63 $7,358.16 10.2 Parking Lot - Old Town Public Parking Lot
2 Upgrade existing lighting with LED lighting 1,801.00 $826.97 $7,838.07 9.5 City Hall, Fire Station 73 & Police
Department Upgrade existing lighting with LED lighting 57,704.00 $19,964.57 $194,030.05 9.7 Senior Center
Upgrade existing lighting with LED lighting 10,880.44 $4,279.59 $48,689.44 11.4 EC Motor Retrofit for Walk-in Cooler or Freezer 3,080.64 $1,211.70 $5,551.87 4.6 Total 77,372.08 $28,077.31 $271,115.70 9.66
Table 1.2. Comparison of the savings at each site Vs. the current utility bill Location
Current Electricity Usage Total Electricity
Cost
Total Electricity Usage
Savings
Percent
Electricity
Usage Savings
Total Cost Savings
Percent
Cost
Savings
[kWh/yr] [$] [kWh/yr] [%] [$] [%]
Parking Lot - Pinole Farmers Market 7,671.00 $3,480.22 2,391.00 31% $1,074.85 31% Parking Lot - Beauty & Grace Salon 2,214.00 $1,051.80 1,515.00 68% $719.63 68% Parking Lot - Old Town Public Parking
Lot 2 3,294.00 $1,512.75 1,801.00 55% $826.97 55%
City Hall, Fire Station 73 & Police
Department 624,654.00 $216,120.79 57,704.00 9% $19,964.57 9% Senior Center 145,314.00 $57,156.20 13,961.08 10% $5,491.29 10% Total 783,147 $279,321.76 77,372 10% $28,077.31 10.05%
Measures Omitted from the Energy Action Plan
Energy Action Plan for The City of Pinole
1. City Hall
HVAC – HVAC system at City Hall is currently on VFD, so there are no opportunities for energy savings for this measure.
Water Heater – No opportunities for 80-gallon unit to replace with HPWH as the savings are significantly lower than the cost of a new unit. We can provide you with the proposal if needed.
2. Fire Station 73
HVAC – The public works manager did not allow our auditor to access the roof to gather the info as he stated that a certificate will be needed for that.
3. Post Office
HVAC – The roof did not have an access point, and the facility didn’t let our auditor use the lift that they had on site.
4. Police Department
HVAC - The public works manager did not allow our auditor to access the roof to gather the info as he stated that a certificate will be needed for that.
5. Tiny Tots & Playhouse
HVAC – No HVACs at this site and no other opportunities were found
6. Swim Center
HVAC – No HVACs at this site
Pump – The pumps are already on Drives
7. Senior Center
HVAC – HVACs at this site were all single phase and small units with relatively high efficiency Note 1: No other energy-efficiency opportunities were found at other locations.
Note 2: At the time of the survey, we were not aware of the program fundings for replacing electric hot water heaters with heat pump water heaters. We are working on getting access to survey the sites for hot water heaters and will include them if applicable.
On Bill Financing - Executive Summary
Energy Action Plan for The City of Pinole
EcoGreen Solutions is pleased to present a comprehensive Energy Action Plan for the City of Pinole, focused on upgrading municipal facilities with innovative energy-efficient technologies. This plan aims to reduce energy consumption, enhance operational efficiency, and support the City’s long-term sustainability goals. EcoGreen Solutions will oversee the entire scope of work, ensuring smooth project execution, minimal disruption to City operations, and a significant return on investment.
Project Overview:
EcoGreen Solutions will implement a series of energy efficiency upgrades across key municipal facilities, including lighting, Variable Frequency Drive and ECM refrigeration. Focusing on proven technologies, we will reduce energy use, lower operating costs, and contribute to the City of Pinole’s environmental stewardship.
Key Upgrades:
1. LED Lighting Replacement
EcoGreen will upgrade outdated lighting systems in City facilities to energy-efficient LED lighting. LEDs provide superior energy efficiency, longer lifespans, and lower maintenance costs compared to traditional lighting. This upgrade will lead to significant reductions in electricity consumption, decrease ongoing maintenance expenses, and enhance the quality and consistency of lighting in municipal buildings and outdoor areas.
2. EC Motor Retrofit for Walk-in Freezer or Cooler
EcoGreen will retrofit permanent split-capacitor (PSC) motors in Walk-in Cooler units with high-efficiency EC motors that feature either integrated VFDs or smart motor controls. These new motors will reduce electricity consumption and enhance system performance by minimizing energy losses and increasing the reliability of refrigeration systems. The upgrades will also extend the lifespan of refrigeration units, reducing the need for costly repairs and replacements in the future.
3. Heat Pump Water Heater1
EcoGreen proposes to replace existing electric resistance tank water heaters with high-efficiency heat pump water heaters (HPWHs) to significantly reduce energy consumption and improve overall system 1 Please note that the water heater needs further OBF analysis and will be presented after the incentives are finalized by the utility
performance. These advanced units use heat-pump technology to move heat rather than generate it, delivering two to four times greater efficiency than standard electric tanks. The upgrade will lower electricity usage, improve hot-water reliability, and ensure more consistent performance across a range of operating conditions.
By transitioning to HPWH technology, EcoGreen will also extend the operational life of customer water-heating systems. Heat pump units experience less thermal stress and operate more efficiently, reducing wear on internal components and minimizing the likelihood of costly repairs or premature replacements. This retrofit not only supports long-term sustainability goals but also provides substantial ongoing utility savings for facility operators.
Financing Through PG&E’s On-Bill Financing (OBF)
EcoGreen will help the City of Pinole take advantage of PG&E’s On-Bill Financing (OBF) program to fund energy efficiency upgrades. This program provides zero-interest financing, enabling the City to pay for the upgrades over time using savings generated from these improvements. The OBF program guarantees that the city can implement these enhancements with no upfront capital required, while the immediate energy savings will offset the financing costs, making the project financially sustainable.
Project Outcomes:
Energy Savings: The energy efficiency upgrades are anticipated to yield significant reductions in energy consumption, resulting in lower electricity bills and a reduction in the City’s carbon footprint. Improved Operational Efficiency: By replacing outdated systems and integrating innovative technology, the city will improve the performance and reliability of its lighting and refrigeration equipment.
Sustainability and Climate Action: These upgrades are in line with the City of Pinole’s commitment to sustainability and climate action goals, aiding in the reduction of greenhouse gas emissions and the achievement of energy efficiency targets.
Benefits of EcoGreen Solutions:
EcoGreen Solutions is a reliable partner with extensive experience in delivering energy savings projects for municipalities. Our expertise and commitment to sustainability ensure that we provide cost-effective, high-quality solutions that yield long-term results. We will manage every phase of the project, from initial assessments and design to installation and post-project support, guaranteeing that the City of Pinole benefits from a streamlined, efficient process and exceptional outcomes.
By using PG&E’s On-Bill Financing program, EcoGreen Solutions will allow the City of Pinole to implement these energy-efficient improvements without needing upfront investment, while ensuring quick returns through significant energy savings. This strategy guarantees that the project is financially viable and sustainable, while also achieving substantial reductions in energy consumption and operational costs.
This Energy Action Plan represents a progressive step toward a more sustainable future for the City of Pinole. EcoGreen Solutions is honored to partner with the city in implementing these essential upgrades, supporting its environmental objectives and positioning the City of Pinole as a leader in energy efficiency and sustainability.
Project Scope of Work
EcoGreen will enhance the energy efficiency of multiple buildings and sites for The City of Pinole:
Parking Lot – Pinole Farmers Market
Parking Lot – Beauty & Grace Salon
Parking Lot – Old Town Public Parking Lot 2
City Hall, Fire Sation 73 & Police Department
Senior Center
The project includes replacing existing lighting with energy-efficient LED fixtures, upgrading outdated Walk-in Cooler PSC fan motors with high-efficiency EC motors, and replacing existing electric resistance water heaters with high-performance heat pump water heaters. The work will begin with a comprehensive site assessment, followed by the installation of new systems and fixtures. After installation, EcoGreen will conduct system testing to ensure optimal performance, train maintenance staff on the upgraded equipment, and responsibly dispose of all removed materials. The project aims to reduce energy consumption, lower utility costs, and enhance the environmental sustainability of the City’s public buildings. Completion timelines and budget estimates will be finalized after the initial assessment.
Site One: Parking Lot - Pinole Farmers Market
Figure 1.1. City of Pinole – Pinole Farmers Market Parking Lot, 798 Fernandez Ave, Pinole, CA 94564.
EcoGreen’s scope of work for this parking lot will include upgrading all outdated lighting to energy-efficient LED fixtures. This upgrade will not only enhance the overall lighting quality and ambiance but will also decrease energy consumption and reduce maintenance costs. Eco Green will ensure that the new LED lighting complies with local building codes and energy standards while providing a longer lifespan and improved performance.
Quote
201388
27671 La Paz Rd, Suite 100 9/18/2025
Laguna Niguel, CA. 92677
[email protected]
(949) 364 - 6800
Quotes are valid for 30 days from the above date.
EGLF-TCP60-5000-UNV ext LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 11 $99.98 $1,099.78 * All quantities to be verified by owner SUBTOTAL $1,099.78 LABOR $3,148.66
SALES TAX Included
(Brackets, Wiring, Sockets, Electrician Travel, Tiewire, Screws, Lifts, Lamp Recycling / Disposal, Shipping, Package, ETC.) MISC. CHARGES $1,649.67 3rd Party QA Review $1,750.00
TOTAL PROJECT COST $7,648.11
Estimated IRS Federal Tax Deduction per 179D: $0.00
Estimated Annual Energy Savings: $1,074.85
QUOTED PRICING DOES NOT REFLECT INCOMING TARIFFS - FINAL PROJECT COST
SUBJECT TO CHANGE BY TARIFF AMOUNT DEPENDING UPON TIME OF PURCHASE AND
PROJECT APPROVAL
SIGNATURE: _________________________________________________________________________________ DATE:___________________________ WHEN SIGNED OR APPROVED BY CLIENT, THIS FORM BECOMES AN OFFICIAL ORDER AND A LEGALLY BINDING COMMITMENT SUBJECT TO THE TERMS AND CONDITIONS OF THIS FORM. BY ACCEPTING THIS PROJECT AND MOVING FORWARD, CUSTOMER AGREES TO HAVE ECOGREEN SOLUTIONS PURCHASE AND INSTALL THE PRODUCTS LISTED ABOVE. All returned checks are subject to a $20 service charge. If customer is utilizing a utility program where they default or get disqualified post install and the pre approved utility funding is canceled, the customer is liable for the project amount in full and the terms and conditions above will need to be met. Subject to collections and or litigation. If this invoice is not paid in full when due, a 1.5% per month late charge will be imposed. In this event, customer will be liable to pay reasonable collection charge, attorney fee and court cost. Warranty to be serviced by factory (see EcoGreen Scope of Work and warranty statement provided by the factory).
TERMS AND CONDITIONS
Quote #
DATE
CITY OF PINOLE
City of Pinole - Parking Lot - Pinole Farmers' Market
Amount
798 Fernandez Ave
Pinole, 94564 CA
Acct: 4840156969; SAID: 4840156501
Light EPN INT/
EXT DESCRIPTION QTY* Unit Price
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Community Dev. Director 0 Approx. Building Size - SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.45 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 201388 KWh
Saved
area light w1 mh 190 w 11 4.6 7 / 1672 parking lot 0 LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 11 11 1,430 w 68.4% 2,391.20 $1,074.85 Totals 11 Ave: 1672 w 11 1,430 w 68.4% 2,391.20 $1,074.85 1,430 Estimated Watts Saved Total Project Cost $7,648.11 Approximate Energy Savings Per Month 2,391 Estimated Annual kWh Saved Total After Rebate/Incentive Project Cost $7,648.11 Estimated Energy Savings Per Year
0.3 Estimated Avg Annual Res Powered by Savings ****Estimated Program Payback Period Yrs. 7.12 **Estimated Total Savings Over 5 Years 2 Estimated Annual CO2 Savings (MT) ** Estimated Total Savings After 10 Years - Estimated Btu Savings Per Month Estimated Energy Rebate
68.4% Estimated Average Electrical Savings Estimated IRS Tax Deduction 179D Available
14.1% Estimated ***Estimated Federal Tax Savings
7.12 Estimated Payback Period Yrs. - No Rebates, Tax Deductions or Bulb Replacement Savings Estimated Bulb Replacement Savings Per Year
6.52 Estimated Payback Period Yrs. Fully Comprehensive^ ^^ Estimated Bulb Replacement Savings Per Avg. Est. Life of LED Estimated Loan Payment
*** Based on IRS 179D Deduction @ 35% federal tax rate NOTE: Attached calculations do not include depreciation deduction for project cost. ****Program Payback Period Yrs. = (Total Project Cost - Available Program Rebates or Incentives) / Estimated $ Saved per Year *Payment is based on a 7.12 year loan at 0% interest OAC, actual my vary. ^Payback Period Yrs. = (Total Project Cost - Available Rebate or Incentive - Tax Savings) / (Estimated Savings Per Year + Bulb Replacement Savings Per Yr.) ** Reflects energy savings per year increasing at industry standard 6% per year + Bulb Replacement ^^Based on industry standard LED lifespan of 50,000 hrs. $98.79
$17,666.18
$0.00
$6,059.02
$14,167.36
$0.00
$0.00
$88.93
Existing Operating
Hours-Day / Yr.
$89.57
$1,074.85
Existing Watts/
Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - Parking Lot - Pinole Farmers' Market
798 Fernandez Ave
Pinole, 94564 CA
Acct: 4840156969; SAID: 4840156501
# of
Lamps
Site Two: Parking Lot – Beauty & Grace Salon
Figure 1.2. City of Pinole – Beauty & Grace Salon Parking Lot, 647 Tennent Ave, Pinole, CA 94564.
EcoGreen will retrofit the parking lot by converting every legacy light to LED technology. This modernization enhances light quality and visibility, lowers power consumption, and cuts ongoing upkeep costs. The system will fully comply with local codes and efficiency requirements and provide an extended lifespan with improved output.
Quote
201381
27671 La Paz Rd, Suite 100 9/18/2025
Laguna Niguel, CA. 92677
[email protected]
(949) 364 - 6800
Quotes are valid for 30 days from the above date.
EGLF-TCP60-5000-UNV ext LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 10 $99.98 $999.80 * All quantities to be verified by owner SUBTOTAL $999.80 LABOR $3,148.66
SALES TAX Included
(Brackets, Wiring, Sockets, Electrician Travel, Tiewire, Screws, Lifts, Lamp Recycling / Disposal, Shipping, Package, ETC.) MISC. CHARGES $1,459.71 3rd Party QA Review $1,750.00
TOTAL PROJECT COST $7,358.16
Estimated IRS Federal Tax Deduction per 179D: $0.00
Estimated Annual Energy Savings: $719.63
Unit Price
QUOTED PRICING DOES NOT REFLECT INCOMING TARIFFS - FINAL PROJECT COST
SUBJECT TO CHANGE BY TARIFF AMOUNT DEPENDING UPON TIME OF PURCHASE AND
PROJECT APPROVAL
SIGNATURE: _________________________________________________________________________________ DATE:___________________________ WHEN SIGNED OR APPROVED BY CLIENT, THIS FORM BECOMES AN OFFICIAL ORDER AND A LEGALLY BINDING COMMITMENT SUBJECT TO THE TERMS AND CONDITIONS OF THIS FORM. BY ACCEPTING THIS PROJECT AND MOVING FORWARD, CUSTOMER AGREES TO HAVE ECOGREEN SOLUTIONS PURCHASE AND INSTALL THE PRODUCTS LISTED ABOVE. All returned checks are subject to a $20 service charge. If customer is utilizing a utility program where they default or get disqualified post install and the pre approved utility funding is canceled, the customer is liable for the project amount in full and the terms and conditions above will need to be met. Subject to collections and or litigation. If this invoice is not paid in full when due, a 1.5% per month late charge will be imposed. In this event, customer will be liable to pay reasonable collection charge, attorney fee and court cost. Warranty to be serviced by factory (see EcoGreen Scope of Work and warranty statement provided by the factory).
TERMS AND CONDITIONS
Quote #
DATE
CITY OF PINOLE
City of Pinole - Parking Lot - Beauty & Grace Salon
Amount
647 Tennent Ave
Pinole, CA 94564
Acct: 1048223537; SAID: 1048223998
Light EPN INT/
EXT DESCRIPTION QTY*
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size - SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.48 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 201381 KWh
Saved
area light w2 MH heads 190 w 6 3 7 / 1165 parking lot 0 LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 6 6 780 w 68.4% 908.88 $431.78 area light w1 MH 190 w 4 3 7 / 1165 parking lot 0 LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 4 4 520 w 68.4% 605.92 $287.85 Totals 10 Ave: 1165 w 10 1,300 w 68.4% 1,514.80 $719.63 1,300 Estimated Watts Saved Total Project Cost $7,358.16 Approximate Energy Savings Per Month 1,515 Estimated Annual kWh Saved Total After Rebate/Incentive Project Cost $7,358.16 Estimated Energy Savings Per Year
0.2 Estimated Avg Annual Res Powered by Savings ****Estimated Program Payback Period Yrs. 9.89 **Estimated Total Savings Over 5 Years 1 Estimated Annual CO2 Savings (MT) ** Estimated Total Savings After 10 Years - Estimated Btu Savings Per Month Estimated Energy Rebate
68.4% Estimated Average Electrical Savings Estimated IRS Tax Deduction 179D Available
9.8% Estimated ***Estimated Federal Tax Savings
10.22 Estimated Payback Period Yrs. - No Rebates, Tax Deductions or Bulb Replacement Savings Estimated Bulb Replacement Savings Per Year
9.42 Estimated Payback Period Yrs. Fully Comprehensive^ ^^ Estimated Bulb Replacement Savings Per Avg. Est. Life of LED Estimated Loan Payment
*** Based on IRS 179D Deduction @ 35% federal tax rate NOTE: Attached calculations do not include depreciation deduction for project cost. ****Program Payback Period Yrs. = (Total Project Cost - Available Program Rebates or Incentives) / Estimated $ Saved per Year *Payment is based on a 9.89 year loan at 0% interest OAC, actual my vary. ^Payback Period Yrs. = (Total Project Cost - Available Rebate or Incentive - Tax Savings) / (Estimated Savings Per Year + Bulb Replacement Savings Per Yr.) ** Reflects energy savings per year increasing at industry standard 6% per year + Bulb Replacement ^^Based on industry standard LED lifespan of 50,000 hrs. $61.27
$22,564.53
$0.00
$4,056.63
$9,485.31
$0.00
$0.00
$59.32
Existing Operating
Hours-Day / Yr.
$59.97
$719.63
Existing Watts/
Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - Parking Lot - Beauty & Grace Salon
647 Tennent Ave
Pinole, CA 94564
Acct: 1048223537; SAID: 1048223998
# of
Lamps
Site Three: Parking Lot – Old Town Public Parking 2
Figure 1.3. City of Pinole – Old Town Public Parking Lot, 2401 San Pablo Ave, Pinole, CA 94564.
For this parking lot, EcoGreen will replace all outdated fixtures with high-efficiency LED lighting. The upgrade will improve illumination and overall ambiance while reducing energy use and maintenance expenses. All new LEDs will be installed to meet local building codes and energy standards and deliver longer service life with dependable performance.
Quote
201394
27671 La Paz Rd, Suite 100 12/1/2025
Laguna Niguel, CA. 92677
[email protected]
(949) 364 - 6800
Quotes are valid for 30 days from the above date.
EGLF-TCP60-5000-UNV ext LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 14 $99.98 $1,399.72 0 0 0 0 w 0 $0.00 $0.00
0 0 0 0 w 0 $0.00 $0.00
* All quantities to be verified by owner SUBTOTAL $1,399.72 LABOR $3,148.66
SALES TAX Included
(Brackets, Wiring, Sockets, Electrician Travel, Tiewire, Screws, Lifts, Lamp Recycling / Disposal, Shipping, Package, ETC.) MISC. CHARGES $1,539.69 3rd Party QA Review $1,750.00
TOTAL PROJECT COST $7,838.07
Estimated IRS Federal Tax Deduction per 179D: $0.00
Estimated Annual Energy Savings: $826.96
QUOTED PRICING DOES NOT REFLECT INCOMING TARIFFS - FINAL PROJECT COST
SUBJECT TO CHANGE BY TARIFF AMOUNT DEPENDING UPON TIME OF PURCHASE AND
PROJECT APPROVAL
SIGNATURE: _________________________________________________________________________________ DATE:___________________________ WHEN SIGNED OR APPROVED BY CLIENT, THIS FORM BECOMES AN OFFICIAL ORDER AND A LEGALLY BINDING COMMITMENT SUBJECT TO THE TERMS AND CONDITIONS OF THIS FORM. BY ACCEPTING THIS PROJECT AND MOVING FORWARD, CUSTOMER AGREES TO HAVE ECOGREEN SOLUTIONS PURCHASE AND INSTALL THE PRODUCTS LISTED ABOVE. All returned checks are subject to a $20 service charge. If customer is utilizing a utility program where they default or get disqualified post install and the pre approved utility funding is canceled, the customer is liable for the project amount in full and the terms and conditions above will need to be met. Subject to collections and or litigation. If this invoice is not paid in full when due, a 1.5% per month late charge will be imposed. In this event, customer will be liable to pay reasonable collection charge, attorney fee and court cost. Warranty to be serviced by factory (see EcoGreen Scope of Work and warranty statement provided by the factory).
TERMS AND CONDITIONS
Quote #
DATE
CITY OF PINOLE
City of Pinole - Old Town Public Parking - Lot 2
Amount
2401 San Pablo Ave.
Pinole, CA 94564
Acct: 9465139985; SAID: 9465139366
Light EPN INT/
EXT DESCRIPTION QTY* Unit Price
EcoGreen Sales Rep: 0 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size - SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.46 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 201394 KWh
Saved
area light w1 head 190 w 14 2.7 7 / 989 old town parking lot LED High Lumen Filament Highbay Replacement, 5000k, UNV 60 w 14 14 1,820 w 68.4% 1,800.70 $826.96 0 0 w 0 0 0 / 0 0 0 3rd Party QA Review 0 w 0 - - w 0.0% - $0.00 0 0 w 0 0 0 / 0 0 0 0 0 w 0 - - w 0.0% - $0.00
0 0 w 0 0 0 / 0 0 0 0 0 w 0 - - w 0.0% - $0.00
Totals 14 Ave: 989 w 14 1,820 w 68.4% 1,800.70 $826.96
1,820 Estimated Watts Saved Total Project Cost $7,838.07 Approximate Energy Savings Per Month 1,801 Estimated Annual kWh Saved Total After Rebate/Incentive Project Cost $7,838.07 Estimated Energy Savings Per Year
0.2 Estimated Avg Annual Res Powered by Savings ****Estimated Program Payback Period Yrs. 9.48 **Estimated Total Savings Over 5 Years 1 Estimated Annual CO2 Savings (MT) ** Estimated Total Savings After 10 Years - Estimated Btu Savings Per Month Estimated Energy Rebate
68.4% Estimated Average Electrical Savings Estimated IRS Tax Deduction 179D Available
10.6% Estimated ***Estimated Federal Tax Savings
9.48 Estimated Payback Period Yrs. - No Rebates, Tax Deductions or Bulb Replacement Savings Estimated Bulb Replacement Savings Per Year
8.72 Estimated Payback Period Yrs. Fully Comprehensive^ ^^ Estimated Bulb Replacement Savings Per Avg. Est. Life of LED Estimated Loan Payment
*** Based on IRS 179D Deduction @ 35% federal tax rate NOTE: Attached calculations do not include depreciation deduction for project cost. ****Program Payback Period Yrs. = (Total Project Cost - Available Program Rebates or Incentives) / Estimated $ Saved per Year *Payment is based on a 9.48 year loan at 0% interest OAC, actual my vary. ^Payback Period Yrs. = (Total Project Cost - Available Rebate or Incentive - Tax Savings) / (Estimated Savings Per Year + Bulb Replacement Savings Per Yr.) ** Reflects energy savings per year increasing at industry standard 6% per year + Bulb Replacement ^^Based on industry standard LED lifespan of 50,000 hrs. # of
Lamps
# of
Fixtures
CITY OF PINOLE
City of Pinole - Old Town Public Parking - Lot 2
2401 San Pablo Ave.
Pinole, CA 94564
Acct: 9465139985; SAID: 9465139366
Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings Existing Operating
Hours-Day / Yr.
$68.91
$826.96
Existing Watts/
Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved $0.00
$4,661.66
$10,900.00
$0.00
$0.00
$68.16
$72.30
$36,928.43
1 Form 79-1118
Advice 5104-G/7690-E
August 2025
CALIFORNIA STATE GOVERNMENT
CUSTOMERS ON-BILL FINANCING
LOAN AGREEMENT
The undersigned customer (“Customer”) has contracted for the provision of energy efficiency/demand response equipment and services (the “Work”) which qualify for one or more of PG&E’s applicable rebate or incentive programs. Subject to the conditions (including the process for Adjustment and preconditions to funding) set forth below, Pacific Gas and Electric Company (“PG&E”) shall extend a loan (the “Loan”) to Customer in the amount of the loan balance (the “Loan Balance”) pursuant to the terms of this On-Bill Financing Loan Agreement (“Loan Agreement”) and PG&E’s rate schedules E-OBF and/or G-OBF, as applicable (the “Schedule”).
To request the Loan, Customer has submitted a completed On-Bill Financing Application and associated documentation as required by PG&E (the “Application”). Collectively the Application and this Loan Agreement (including any Adjustment hereunder) comprise the “Agreement".
1. Customer shall arrange for its Contractor, as identified at the end of this Agreement (“Contractor”), to provide the Work as described in the Application.
2. The estimated Loan Balance is set forth below. The total cost of the Work as installed, rebate/incentive for qualifying energy efficiency measures, Loan Balance, monthly payment, and loan term specified in this Loan Agreement may be adjusted, if necessary, after the Work and the post-installation inspection described in the Application and/or herein are completed (the “Adjustment”). The Adjustment will be calculated using the actual total cost of the Work, as installed, and the estimated energy savings (as described in the Application) of such Work. In no event will the Loan Balance be increased without Customer’s written consent, even if Customer is eligible for such increased Loan Balance. Moreover, in no event will the Loan Balance exceed the maximum loan amount stipulated in the Application. Customer understands that in order to be eligible for the Loan, the initial Loan Balance for Work may not fall below the minimum loan amount, nor may the payback period exceed the maximum payback period. Accordingly, if after the Adjustment, the Loan Balance falls below the minimum loan amount or if the simple payback period exceeds the program maximum payback period, each as described in the Application, PG&E shall have no obligation to extend the Loan, as the Work would not meet program requirements. The Adjustment described in this paragraph will be communicated to the Customer in writing and will automatically become part of this Loan Agreement, except that any proposed increase in the Loan Balance will only become part of this Loan Agreement upon Customer’s written consent to such increase.
3. PG&E shall have no liability in connection with, and makes no warranties, expressed or implied, regarding the Work.
The Parties acknowledge and agree that PG&E is only providing the State with financing. The Customer has independently hired contractors ("State Contractors") to perform the work on behalf of the Customer to qualify for financing. The Customer acknowledges and agrees that the State Contractors are not third party beneficiaries to this agreement between the Customer and PG&E. To the extent authorized by law and subject to appropriation of the Legislature, the Customer agrees that it will look only to State Contractors for any claims related to the installed equipment or its performance and that PG&E shall have no responsibility or liability, except for the payment of the loan proceeds, and the Customer shall indemnify PG&E for any claims made by the State Contractors against PG&E.
4. Customer represents and warrants that (a) Customer is receiving this Loan solely for Work obtained in connection with Customer’s business, and not for personal, family or household purposes; (b) Customer, if not an individual or a government agency, is duly organized, validly existing and in good standing under the laws of its state of formation, and has full power and authority to enter into this Agreement and to carry out the provisions of this Agreement. Customer is duly qualified and in good standing to do business in all jurisdictions where such qualification is required; (c) this Loan Agreement has been duly authorized by all necessary proceedings, has been duly executed and delivered by Customer and is a valid and legally binding agreement of Customer duly enforceable in accordance with its terms; (d) no consent, approval, authorization, order, registration or qualification of or with any court or regulatory authority or other governmental body having jurisdiction over Customer is required for, and the absence of which would adversely affect, the legal and valid execution and delivery of this Loan Agreement, and the performance of the transactions contemplated by this Loan Agreement; (e) the execution and delivery of this Loan Agreement by Customer hereunder and the compliance by Customer with all provisions of this Loan Agreement: (i) will not conflict with or violate any Applicable Law; and (ii) will not conflict with or result in a breach of or default under any of the terms or provisions of any loan agreement or other contract or agreement under which Customer is an obligor or by which its property is bound; and (f) all factual information furnished by Customer to PG&E in the Application and pursuant to this Agreement is true and accurate.
5. The Application must include the Federal Tax Identification Number or Social Security Number of the party who will be the recipient of the checks for the rebate/incentive or any Loan proceeds. Checks may be issued directly to the Customer or its designated Contractor or both, for the benefit of the Customer, as specified below. Customer acknowledges that PG&E will not be responsible for any tax liability imposed on the Customer or its contractor in connection with the transactions contemplated under the Agreement, whether by virtue of the Loan contemplated under the Agreement, or otherwise, and Customer shall indemnify PG&E for any tax liability imposed upon PG&E as a result of the transactions contemplated under the Agreement.
2 Form 79-1118
Advice 5104-G/7690-E
August 2025
6. Upon completion of the Work, Customer shall send a written confirmation of completion to PG&E’s On-Bill Financing Program Administrator at the address listed in Section 15. Within 60 days after receiving the confirmation, PG&E (a) will conduct a post installation inspection and project verification, including review of invoices, receipts and other documents as required by PG&E to verify the correctness of any amounts claimed by Customer; and (b) will adjust, if necessary, the total cost, incentive, Loan Balance, monthly payment, and loan term as stated above. Customer shall give PG&E reasonable access to its premises and the Work. If the Work conforms to all requirements of the Agreement and all amounts claimed by Customer as Work costs are substantiated to PG&E’s reasonable satisfaction, PG&E will issue a check (“Check”) to Customer or Contractor (as designated by Customer in Section 15) for all amounts PG&E approves for payment in accordance with the Agreement. The date of such issuance is the “Issuance Date”. If the Check is issued to Customer, Customer shall be responsible for paying any outstanding fees due to Contractor for the Work. If the Check is less than the amount due from Customer to Contractor, Customer shall be responsible for the excess due to the Contractor.
7. Customer shall repay the Loan Balance to PG&E as provided in this Loan Agreement irrespective of whether or when the Work is completed, or whether the Work is in any way defective or deficient, and whether or not the Work delivers energy efficiency savings to Customer.
8. The monthly payments will be included by PG&E on the Account's regular energy service bills, or by separate bill, in PG&E’s discretion. Regardless whether the monthly payments are included in the regular utility bill or a separate loan installment bill, the following repayment terms will apply:
a. The Customer agrees to repay to PG&E the Loan Balance in the number of payments listed below and in equal installments (with the final installment adjusted to account for rounding), by the due date set forth in each PG&E utility bill or loan installment bill rendered in connection with Customer’s account (identified by the number set forth below) (“Account”), commencing with the bill which has a due date falling at least 30 days after the Issuance Date.
b. If separate energy service bills and loan installment bills are provided, amounts due under this Loan Agreement as shown in the loan installment bill shall be deemed to be amounts due under each energy services bill to the Account, and a default under this Loan Agreement shall be treated as a default under the Account.
c. If the Customer is unable to make a full utility bill payment in a given month, payment arrangements may be made at PG&E’s discretion.
d. Any partial bill payments received for a month will be applied in equal proportion to the energy charges and the loan obligation for that month, and the Customer may be considered in default of both the energy bill and the loan installment bill.
e. Further payment details are set forth below.
9. Any notice from PG&E to Customer regarding the Program or the transactions contemplated under the Loan Agreement may be provided within a PG&E utility bill or loan installment bill, and any such notices may also be provided to Customer at the address below or to the Customer’s billing address of record in PG&E’s customer billing system from time to time, and in each case shall be effective five (5) days after they have been mailed.
10. The Loan Balance shall not bear interest.
11. Customer may, without prepayment penalty, pay the entire outstanding loan balance in one lump sum payment provided the customer first notifies PG&E by telephoning the toll free phone number (1-800-468-4743), and by sending written notice to PG&E On-Bill Financing Program Administrator at the address listed below, in advance of making the lump sum payment. Accelerated payments that are received from Customer without PG&E’s prior approval may, at PG&E’s sole discretion, be applied proportionally to subsequent energy charges and Loan repayments and PG&E shall have no obligation to apply accelerated payments exclusively to reduction of the outstanding Loan.
12. The entire outstanding Loan Balance will become immediately due and payable, and shall be paid by Customer within 30 days if:
(i) the Account is closed or terminated for any reason; (ii) Customer defaults under the Agreement; (iii) Customer sells the equipment forming part of the Work to any third party; or (iv) Customer becomes Insolvent. Customer becomes “Insolvent” if: (i) Customer is unable to pay its debts as they become due or otherwise becomes insolvent, makes a general assignment for the benefit of its creditors, or suffers or permits the appointment of a receiver for its business or assets or otherwise ceases to conduct business in the normal course; or (ii) any proceeding is commenced by or against Customer under any bankruptcy or insolvency law that is not dismissed or stayed within 45 days.
13. Customer understands that without limiting any other remedy available to PG&E against Contractor or Customer, failure to repay the Loan Balance in accordance with the terms of the Agreement could result in shut-off of utility energy service, adverse credit reporting, and collection procedures, including, without limitation, legal action.
14. If there is any conflict among the documents comprising the Agreement, the following order of priority shall apply: 1. this Loan Agreement; 2. the Application; 3. any documents attached to the Application.
3 Form 79-1118
Advice 5104-G/7690-E
August 2025
15. STATE OF CALIFORNIA REQUIREMENT
a. All Payment Obligations Subject to Appropriation
The Customer acknowledges that the cost incurred pursuant to this Loan Agreement will be part of the monthly bill for electricity use. All payment obligations and the Work replacement obligations of the Customer under this Loan Agreement or any related agreement or application is subject to appropriation by the Legislature of the State of California.
b. No Lien or Encumbrance; Subordination:
(1) Notwithstanding any other provision in this Loan Agreement – , PG&E acknowledges that nothing in this Loan Agreement shall constitute a mortgage, charge, assignment, transfer, pledge, lien or encumbrance upon either the Work or any part of the buildings, structures or related facilities in which the Work is constructed, installed or situated (collectively, the “Related Facilities”). Accordingly, PG&E agrees it will not record or file any instrument that would indicate or imply it has a security interest in the Related Facilities, including but not limited to a UCC-1. (2) In addition to the preceding paragraph (a), if this Loan Agreement were ever construed or deemed to create any such encumbrance, then: (i) this Loan Agreement shall be junior and subordinate and subject in all respects to the terms and conditions of any and all leases, and indentures related to lease revenue bonds issued by the State Public Works Board of the State of California or any other issuer of bonds on behalf of the state concerning the Related Facilities entered into in the past, the present or the future (the “Senior Security Documents”); and (ii) any term or condition of this Loan Agreement relating to any right, title or interest in the Related Facilities or other benefits derived there from shall be in all respects junior and subordinate to, and subject to the terms of, the Senior Security Documents.
4 Form 79-1118
Advice 5104-G/7690-E
August 2025
16. Loan Particulars.
This table is to be completed by PG&E
Total Cost Incentive Customer
Buy- Down
(if applicable)
Loan Balance
1 Monthly
Payment
Term 2
(months)
Number of
Payments
$ 7,838.07 $ - $ - $ 7,838.07 $ 68.16 115 115
Check Made Payable to Customer □ or Contractor □
[customer to select payment method. Note that only one check can be issued]
17. This agreement at all times shall be subject to such modifications as the California Public Utilities Commission may direct from time to time in the exercise of its jurisdiction.
Federal Tax ID or Social Security #, Customer Federal Tax ID or Social Security #, Contractor 94-6000394 80-0196823
PG&E Account # / Service Agreement #
9465139985 / 9465139366
Account Name, Customer Name, Contractor
Primary Customer Name: CITY OF PINOLE - NEAR
795 FERNANDEZ -
EcoGreen Solutions, Corey Brophy
Project ID: City of Pinole - Old Town Public Parking - Lot 2
FA ID: 016786
Customer Address (For OBF Check Delivery) Contractor Address (For OBF Check Delivery) 27671 La Paz Rd, Suite 100
Laguna Niguel CA 92677
Name and Title of Authorized Representative of
.Customer
Name and Title of Authorized Representative of
.Contractor
Corey Brophy, EcoGreen Solutions
Signature of Authorized Representative of Customer
Date
ACCEPTED: Pacific Gas and Electric Company
By Date
PG&E On-Bill Financing Authorized Representative
18. Once this Agreement is effective and unless otherwise agreed to by PG&E in writing, Customer must complete the approved project they are using these funds for, including submitting all post-installation documentation requirements, within 24 months thereafter. For avoidance of doubt, Customer will not be eligible and will not receive any funding under this Agreement, if their project is not fully completed within the 24 months or as otherwise expressly agreed by PG&E. 1 The Loan Balance shall not exceed two-hundred fifty thousand dollars ($250,000), except where, in PG&E’s sole opinion, the opportunity for uniquely large energy savings exist, in which case the Loan Balance may exceed two-hundred fifty thousand dollars ($250,000) but shall not exceed four million dollars ($4,000,000).
2 The loan term in months will be established by PG&E at the time of the OBF Loan Agreement initiation.
The maximum loan term shall be one hundred and twenty (120) months.
5 Form 79-1118
Advice 5104-G/7690-E
August 2025
On-Bill Financing Program (OBF)
Loan Calculation Summary Sheet
Simple project payback per meter
Customer Name: CITY OF PINOLE - NEAR 795 FERNANDEZ -
Project Number: FA ID: 016786
Calculations from:
Original
(A)
PROJECT COST FOR
MEASURES
(B)
REBATES or INCENTIVES Customer Down
Payment or Buy-Down
CUSTOMER
TOTAL LOAN
AMOUNT
(C)
CUSTOMER
AVERAGE
RATE PER kWh
(D)
CUSTOMER
AVERAGE RATE
PER Therm
(E)
ESTIMATED
ANNUAL
ENERGY
SAVINGS
(kWh)
(F)
ESTIMATED
ANNUAL GAS
SAVINGS
(Therm)
ESTIMATED
ANNUAL ENERGY
COST SAVINGS
SIMPLE
PAYBACK IN
YEARS
$ 7,838.07 $ - $ - $ 7,838.07 $ 0.46 $ - 1,800.70 - $ 826.96 9.48
PAYBACK IN MONTHS
BASED ON EXPECTED
ENERGY SAVINGS
LOAN TERM (MONTHS)
(1 month added for bill
neutrality)
CUSTOMER FIXED
MONTHLY LOAN
PAYMENT
ESTIMATED
MONTHLY
ENERGY COST
SAVINGS
114 115 $ 68.16 $ 68.91
(C) = (From utility bill) Total $ amount (12-month) / Total kWh (same 12-month) (D) = (From utility bill) Total $ amount (12-month) / Total therm (same 12-month)
Site Four: City Hall, Fire Sation 73 & Police Department Figure 1.4. City of Pinole – City Hall, Fire Sation 73 & Police Department, 2131 Pear St & 880 Tennent Ave, Pinole, CA 94564.
EcoGreen will modernize these buildings’ lighting by replacing all outdated fixtures with energy-efficient LEDs. The upgrade will elevate illumination quality and ambiance while significantly cutting energy use and maintenance costs. All new equipment will be installed to meet local building codes and energy standards, delivering longer life and stronger performance. Moreover, the electric storage water heater in the City Hall will be upgraded to a Heat Pump Water Heater to improve energy sustainability and reduce energy usage.
Quote
0 27671 La Paz Rd, Suite 100 1/0/1900
Laguna Niguel, CA. 92677
[email protected]
(949) 364 - 6800
Quotes are valid for 30 days from the above date.
EGTU-TC10-4ft-3500-T8-B int 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 56 $11.97 $670.32 EGTU-TC10-4ft-5000-T8-B int 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 627 $11.97 $7,505.19 EGCL-ML18-8"-CS-UNV-REC int LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 100 $115.00 $11,500.00 EGCL-ML18-8"-CS-UNV-REC ext LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 14 $115.00 $1,610.00 EG22-SF25-4000-UNV-REC int LED Troffer 2x2,Retrofit Kit 35K, 40K, 50K, UNV, REC 17 w 55 $149.00 $8,195.00 EGTU-TS12-3ft-5000-UNV-T8-B int 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 11 $13.59 $149.49 EGTU-TC10-4ft-4000-T8-B int 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 10.5 w 77 $11.97 $921.69 EGWS-SL12-4000K-UNV int LED Half Moon Sconce, 4000K, UNV 12 w 5 $169.98 $849.90 EGPL-GC10.5-4000-UNV-H int LED Horizontal PL Replacement, 4000K, UNV, W? 2 Pin Adaptor 10 w 22 $23.00 $506.00 EGLN-ML20.2-2ft-CS-UNV-WRP int (Wattage Selectable 20w, 25w, 30w) LED 2' Linear Wrap Fixture,Color Selectable (3500K, 4000K, 5000K) , UNV 20.2 w 1 $195.00 $195.00 EG24-SF26-4000-UNV-REC int LED Troffer 2x4 Retrofit Kit, 3500K, 4000K, 5000K, UNV, REC 26 w 13 $149.00 $1,937.00 EGLB-ST13-4000K-UNV int LED 9in Low Bay, 4000K, UNV 13 w 1 $89.00 $89.00 EG24-SF20-4000-UNV-REC int LED Troffer 2x4 Retrofit Kit, 3500K, 4000K, 5000K, UNV, REC 20 w 2 $149.00 $298.00 EGLN-ML23.86-4ft-CS-UNV-SMT-WRP int LED 4' Linear Wrap Fixture, 35K, 4K, 5K, UNV 23.9 w 11 $179.00 $1,969.00 EGSL-ATG18-CCT-UNV int LED Stairwell Linear, CCT, UNV 17.9 w 5 $138.58 $692.90 EGLN-TCWS-CS-UNV-8FT int LED 8' Linear Fixture, 35K, 4K, 5K, UNV 32 w 15 $149.00 $2,235.00 EGCL-ML28-10"-CS-UNV-REC int LED 10" Can Downlight,2700K,3000K,3500K,4000K,5000K, UNV,REC 28 w 12 $145.00 $1,740.00 EGED-X-X 0 Emergency Driver 0 w 55 $150.00 $8,250.00
SUBTOTAL $49,313.49
LABOR $110,052.95
SALES TAX Included
(Brackets, Wiring, Sockets, Electrician Travel, Tiewire, Screws, Lifts, Lamp Recycling / Disposal, Shipping, Package, ETC.) MISC. CHARGES $32,663.61 3rd Party QA Review $2,000.00
TOTAL PROJECT COST $194,030.05
Estimated IRS Federal Tax Deduction per 179D: $16,504.80 Estimated Annual Energy Savings: $19,964.57
SIGNATURE: _________________________________________________________________________________ DATE:___________________________ WHEN SIGNED OR APPROVED BY CLIENT, THIS FORM BECOMES AN OFFICIAL ORDER AND A LEGALLY BINDING COMMITMENT SUBJECT TO THE TERMS AND CONDITIONS OF THIS FORM. BY ACCEPTING THIS PROJECT AND MOVING FORWARD, CUSTOMER AGREES TO HAVE ECOGREEN SOLUTIONS PURCHASE AND INSTALL THE PRODUCTS LISTED ABOVE. All returned checks are subject to a $20 service charge. If customer is utilizing a utility program where they default or get disqualified post install and the pre approved utility funding is canceled, the customer is liable for the project amount in full and the terms and conditions above will need to be met. Subject to collections and or litigation. If this invoice is not paid in full when due, a 1.5% per month late charge will be imposed. In this event, customer will be liable to pay reasonable collection charge, attorney fee and court cost. Warranty to be serviced by factory (see EcoGreen Scope of Work and warranty statement provided by the factory).
TERMS AND CONDITIONS
Quote #
DATE
CITY OF PINOLE
City of Pinole - City Hall, Police Department, Fire Station 73 & Post Office Amount
2131 Pear St
Pinole, CA 94564
Acct: 1194267547; SAID: 1196945891
Light EPN INT/
EXT DESCRIPTION QTY* Unit Price
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size 27,508 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.35 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 0 KWh
Saved
HVAC 0 w 0 0 0 / 0 public safety building engineering PENDING 0 w 0 - - w 0.0% - $0.00 4ft linear w2 t8s 59 w 1 2 5 / 522 public safety building 1st floor (police dept) electrical room (locked) LED Stairwell Linear, CCT, UNV 17.9 w 1 1 41 w 69.7% 21.47 $7.43 4ft linear w2 t8s 59 w 1 4 5 / 1043 public safety building 1st floor (police dept) adult 1 LED Stairwell Linear, CCT, UNV 17.9 w 1 1 41 w 69.7% 42.86 $14.83 4ft linear w2 t8s 59 w 1 4 5 / 1043 public safety building 1st floor (police dept) adult 2 LED Stairwell Linear, CCT, UNV 17.9 w 1 1 41 w 69.7% 42.86 $14.83 4ft linear w2 t8s 59 w 1 4 5 / 1043 public safety building 1st floor (police dept) sc 1 LED Stairwell Linear, CCT, UNV 17.9 w 1 1 41 w 69.7% 42.86 $14.83 4ft linear w2 t8s 59 w 1 4 5 / 1043 public safety building 1st floor (police dept) 0 LED Stairwell Linear, CCT, UNV 17.9 w 1 1 41 w 69.7% 42.86 $14.83 sconce w 2 cfl 31 w 4 9 4 / 1778 city hall first floor entrance lobby LED Horizontal PL Replacement, 4000K, UNV, W? 2 Pin Adaptor 20 w 4 8 44 w 35.5% 78.24 $27.07 sconce w 2 cfl 31 w 7 6 4 / 1185 city hall first floor council chambers LED Horizontal PL Replacement, 4000K, UNV, W? 2 Pin Adaptor 20 w 7 14 77 w 35.5% 91.28 $31.58 2ft lin wrap w 2 t12. 56 w 1 4 5 / 1043 Pinole PD little hallway outside of server room (Wattage Selectable 20w, 25w, 30w) LED 2' Linear Wrap Fixture,Color Selectable (3500K, 4000K, 5000K) , UNV 20.2 w 1 1 36 w 63.9% 37.33 $12.92 10in can w 2 cfl 62 w 4 6 5 / 1564 fire station 73 2nd floor hallway LED 10" Can Downlight,2700K,3000K,3500K,4000K,5000K, UNV,REC 28 w 4 4 136 w 54.8% 212.74 $73.61 10in can w 1 cfl 34 w 4 6 5 / 1564 fire station 73 2nd floor exercise room LED 10" Can Downlight,2700K,3000K,3500K,4000K,5000K, UNV,REC 28 w 4 4 24 w 17.6% 37.54 $12.99 10in can w 2 cfl 62 w 4 6 5 / 1564 fire station 73 2nd floor living room LED 10" Can Downlight,2700K,3000K,3500K,4000K,5000K, UNV,REC 28 w 4 4 136 w 54.8% 212.74 $73.61 4ft lin wrap w 2 t8. 59 w 9 24 7 / 8724 public safety building 1st floor (police dept) jail hallway LED 4' Linear Wrap Fixture, 35K, 4K, 5K, UNV 23.9 w 9 9 316 w 59.5% 2,755.76 $953.45 4ft lin wrap w 2 t8. 59 w 2 24 7 / 8724 public safety building stairwell LED 4' Linear Wrap Fixture, 35K, 4K, 5K, UNV 23.9 w 2 2 70 w 59.5% 612.39 $211.88 8in can w 2 cfl 45 w 3 8 5 / 1998 city hall 1st floor mens bathroom LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 3 3 81 w 60.0% 161.81 $55.99 8in can w 2 cfl 31 w 3 6 4 / 1185 city hall 1st floor mens bathroom LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 3 3 39 w 41.9% 46.23 $16.00 8in can w 2 cfl 45 w 3 8 5 / 1998 city hall 1st floor womens bathroom LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 3 3 81 w 60.0% 161.81 $55.99 8in can w 2 cfl 45 w 2 8 4.5 / 1789 city hall 1st floor printer room LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 2 2 54 w 60.0% 96.61 $33.43 8in can w 2 cfl 45 w 1 1 2 / 93 city hall 1st floor storage room LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 1 1 27 w 60.0% 2.52 $0.87 8in can w 2 cfl 45 w 1 1 4 / 198 city hall 1st floor storage closet LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 1 1 27 w 60.0% 5.33 $1.85 8in can w 2 cfl 45 w 3 9 4.5 / 2013 city hall 1st floor cubicle offices LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 3 3 81 w 60.0% 163.04 $56.41 8in can w 2 cfl - 45 w 1 9 4.5 / 2013 city hall 1st floor office LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 1 1 27 w 60.0% 54.35 $18.80 8in can w 2 cfl 45 w 5 9 4 / 1778 city hall 1st floor 1st floor front desk LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 5 5 135 w 60.0% 240.05 $83.05 8in can w 2 cfl 45 w 4 9 4 / 1778 city hall 1st floor hallway LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 4 4 108 w 60.0% 192.04 $66.44 8in can w 2 cfl 26 w 13 9 4 / 1778 city hall 2nd floor lobby/stairwell landing LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 13 13 104 w 30.8% 184.93 $63.98 8in can w 2 cfl 26 w 9 9 4 / 1778 city hall 2nd floor finance dept lobby LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 9 9 72 w 30.8% 128.03 $44.30 8in can w 2 cfl 45 w 13 5 4 / 988 city hall first floor community room LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 13 13 351 w 60.0% 346.74 $119.97 8in can w 2 cfl 45 w 2 20 7 / 7080 city hall first floor mens bathroom LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 2 2 54 w 60.0% 382.32 $132.28 8in can w 2 cfl 45 w 2 6 4 / 1185 city hall first floor womens bathroom LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 2 2 54 w 60.0% 64.01 $22.15 8in can w 2 cfl 45 w 11 9 4 / 1778 city hall first floor entrance lobby LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 11 11 297 w 60.0% 528.11 $182.72 8in can w 2 cfl 45 w 6 9 4 / 1778 city hall first floor lobby LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 6 6 162 w 60.0% 288.06 $99.66 8in can w 2 cfl 45 w 6 3 3 / 436 city hall first floor stoeage room LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 6 6 162 w 60.0% 70.68 $24.45 8in can w 2 cfl 45 w 12 6 4 / 1185 city hall first floor council chambers LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 12 12 324 w 60.0% 384.08 $132.89 9in can w 2 cfl 66 w 14 11 7 / 4100 city hall front walkway LED 8" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 18 w 14 14 672 w 72.7% 2,754.99 $953.18 lb w 1 a19 incandescent 100 w 1 1 1 / 52 Pinole PD storage closet LED 9in Low Bay, 4000K, UNV 13 w 1 1 87 w 0.0% - $0.00 2x2 w 2 t8 utube 54 w 21 9 4 / 1778 city hall 1st floor hallway LED Troffer 2x2,Retrofit Kit 35K, 40K, 50K, UNV, REC 17 w 21 21 777 w 68.5% 1,381.62 $478.02 2x2 w 2 t8 utube 54 w 22 9 4 / 1778 city hall 2nd floor hallway LED Troffer 2x2,Retrofit Kit 35K, 40K, 50K, UNV, REC 17 w 22 22 787 w 67.8% 1,399.40 $484.17 2x2 w 2 t8 utube 54 w 6 5 4 / 988 city hall first floor community room LED Troffer 2x2,Retrofit Kit 35K, 40K, 50K, UNV, REC 17 w 6 6 222 w 68.5% 219.30 $75.88 2x2 w 2 t8 utube 54 w 6 9 4 / 1778 city hall first floor hallway LED Troffer 2x2,Retrofit Kit 35K, 40K, 50K, UNV, REC 17 w 6 6 222 w 68.5% 394.75 $136.58 2x4 w 2 t8. 59 w 2 12 7 / 4380 public safety building 2nd floor (police dept) conference room LED Troffer 2x4 Retrofit Kit, 3500K, 4000K, 5000K, UNV, REC 20 w 2 2 78 w 66.1% 341.64 $118.20 2x4 w 3 t8. 89 w 8 0 0 / 0 Pinole PD dispatch office LED Troffer 2x4 Retrofit Kit, 3500K, 4000K, 5000K, UNV, REC 26 w 8 8 504 w 0.0% - $0.00 2x4 w 3 t8. 89 w 5 24 7 / 8724 fire station 73 2nd floor hallway LED Troffer 2x4 Retrofit Kit, 3500K, 4000K, 5000K, UNV, REC 26 w 5 5 315 w 70.8% 2,747.90 $950.73 1 single switch 0 w 1 0 0 / 0 city hall 1st floor storage room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor mens bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor mens bathroom Skip 0 w 1 - - w 0.0% - $0.00 LED 3ft lin w 1 t8. 0 w 1 8 5 / 1998 city hall 1st floor womens bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor womens bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor break room/kitchen Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor printer room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor storage room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor storage closet Skip 0 w 1 - - w 0.0% - $0.00 2 double switches 0 w 2 0 0 / 0 city hall 1st floor cubicle offices Skip 0 w 2 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor file storage room Skip 0 w 1 - - w 0.0% - $0.00 1 8switch 0 w 1 0 0 / 0 city hall 1st floor 1st floor front desk Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 1st floor conference room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor server room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 2nd floor hallway to roof access Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 1st floor electrical room Skip 0 w 1 - - w 0.0% - $0.00 1 5switch 0 w 1 0 0 / 0 city hall 2nd floor finance dept lobby Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 2 double switches 0 w 2 0 0 / 0 city hall 2nd floor cubicles Skip 0 w 2 - - w 0.0% - $0.00 2 double switches 0 w 2 0 0 / 0 city hall 2nd floor conference room Skip 0 w 2 - - w 0.0% - $0.00 2 double switches 0 w 2 0 0 / 0 city hall 2nd floor file room Skip 0 w 2 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor printer room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 2nd floor storage closet Skip 0 w 1 - - w 0.0% - $0.00 LED 4ft lin w 1 t8 retrotube 0 w 1 3 4 / 593 city hall 2nd floor womens restroom Skip 0 w 1 - - w 0.0% - $0.00 Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - City Hall, Police Department, Fire Station 73 & Post Office 2131 Pear St
Pinole, CA 94564
Acct: 1194267547; SAID: 1196945891
# of
Lamps
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size 27,508 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.35 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 0 KWh
Saved
Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - City Hall, Police Department, Fire Station 73 & Post Office 2131 Pear St
Pinole, CA 94564
Acct: 1194267547; SAID: 1196945891
# of
Lamps
LED 3ft lin w 1 t8 retrotube 0 w 1 3 4 / 593 city hall 2nd floor womens restroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 2nd floor womens restroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall 2nd floor genderr neutral bathrpom Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor city managers office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor city attorney office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 city hall first floor community room Skip 0 w 1 - - w 0.0% - $0.00 LED 4ft lin w 1 t8 retrotube 0 w 2 0 0 / 0 city hall first floor mens bathroom Skip 0 w 2 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall first floor mens bathroom Skip 0 w 1 - - w 0.0% - $0.00 LED 4ft lin w 1 t8 retrotube 0 w 2 0 0 / 0 city hall first floor womens bathroom Skip 0 w 2 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall first floor womens bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall first floor bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall first floor stoeage room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 city hall first floor office behind chambers Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 city hall first floor storage closet Skip 0 w 1 - - w 0.0% - $0.00 LED 6in can w 1 par38 0 w 28 6 4 / 1185 city hall first floor council chambers Skip 0 w 28 - - w 0.0% - $0.00 LED 5in can w 1 par38 0 w 14 6 4 / 1185 city hall first floor council chambers Skip 0 w 14 - - w 0.0% - $0.00 switches 0 w 0 0 0 / 0 city hall first floor council chambers Skip 0 w 0 - - w 0.0% - $0.00 LED single head pole w 1 corncob 0 w 11 12 7 / 4248 city hall around city hall Skip 0 w 11 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 8 10 5 / 2497 Pinole PD reception cubicles Skip 0 w 8 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD reception cubicles Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 Pinole PD server room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD community outreach office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 0 0 0 / 0 Pinole PD dispatch kitchen Skip 0 w 0 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 Pinole PD dispatch bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD admin office Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 Pinole PD admin conference room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 Pinole PD storage closet Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 2 11 5 / 2747 Pinole PD hallway Skip 0 w 2 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 Pinole PD hallway Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD detective office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD detective office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 Pinole PD interview office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 Pinole PD interview office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD training office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 Pinole PD training office Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 2 4 7 / 1416 public safety building 2nd floor (police dept) mens restroom Skip 0 w 2 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) mens restroom Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 6 12 7 / 4248 public safety building 2nd floor (police dept) stairwell/end of hallway Skip 0 w 6 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) stairwell/end of hallway Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) stairwell/end of hallway Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) office area at top of stairwell Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) archive file room Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) conference room Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) conference room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) conference room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 public safety building 2nd floor (police dept) interview room Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 corncob, 1 cfl 0 w 2 4 5 / 999 public safety building 1st floor (police dept) hallway/lobby Skip 0 w 2 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) hallway/lobby Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 5 4 7 / 1416 public safety building 1st floor (police dept) hallway to armory Skip 0 w 5 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) evidence office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) evidence office Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) evidence locker Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) mens locker room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) mens locker room Skip 0 w 1 - - w 0.0% - $0.00 single switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) hallway Skip 0 w 1 - - w 0.0% - $0.00 LED 4ft lin w 2 t8 retrotube 0 w 24 2 7 / 708 public safety building 1st floor (police dept) gym Skip 0 w 24 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) gym Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 public safety building 1st floor (police dept) armory Skip 0 w 1 - - w 0.0% - $0.00 LED 8in can w 1 a19 0 w 11 12 7 / 4248 breezeway between fire and police dept breezeway Skip 0 w 11 - - w 0.0% - $0.00 LED wp w 1 corncob 0 w 6 12 7 / 4248 public safety building (fire station 73) back driveway Skip 0 w 6 - - w 0.0% - $0.00 LED 8in can w 1 a19 0 w 3 12 7 / 4248 public safety building public parking side of building Skip 0 w 3 - - w 0.0% - $0.00 LED 4ft lin wrap w 2 t8 retrotube 0 w 2 4 5 / 999 post office mens restroom Skip 0 w 2 - - w 0.0% - $0.00 LED vanity w 2 a19 0 w 1 4 5 / 999 post office mens restroom Skip 0 w 1 - - w 0.0% - $0.00
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size 27,508 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.35 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 0 KWh
Saved
Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - City Hall, Police Department, Fire Station 73 & Post Office 2131 Pear St
Pinole, CA 94564
Acct: 1194267547; SAID: 1196945891
# of
Lamps
LED 4ft lin wrap w 2 t8 retrotube 0 w 1 1 5 / 250 post office janitorial Skip 0 w 1 - - w 0.0% - $0.00 4ft lin wrap w 2 t8. 0 w 2 2 3 / 291 post office office/storage room Skip 0 w 2 - - w 0.0% - $0.00 LED 4ft lin wrap w 3 t8 retrotube 0 w 4 9 5 / 2247 post office postmaster office Skip 0 w 4 - - w 0.0% - $0.00 4ft lin wrap w 2 t8. 0 w 1 3 5 / 749 post office womens restroom Skip 0 w 1 - - w 0.0% - $0.00 4ft lin wrap w 2 t8. 0 w 6 4 5 / 999 post office break room Skip 0 w 6 - - w 0.0% - $0.00 lb w 1 a19 incandescent 0 w 1 1 1 / 41 post office storage room above mens restroom/janitorial closet Skip 0 w 1 - - w 0.0% - $0.00 LED all fixtures 0 w 0 0 0 / 0 post office loading dock Skip 0 w 0 - - w 0.0% - $0.00 LED 4ft lin wrap w 2 t8 retrotube 0 w 9 9 5 / 2247 post office PO box area Skip 0 w 9 - - w 0.0% - $0.00 LED 4ft lin wrap w 2 t8 retrotube 0 w 2 9 5 / 2247 post office PO box area Skip 0 w 2 - - w 0.0% - $0.00 hb w 2 cfl ppl 0 w 3 9 5 / 2247 post office retail lobby Skip 0 w 3 - - w 0.0% - $0.00 LED hb w 2 a19 0 w 4 12 7 / 4248 post office front overhang Skip 0 w 4 - - w 0.0% - $0.00 LED vanity w 2 a19 0 w 2 12 7 / 4248 post office front overhang Skip 0 w 2 - - w 0.0% - $0.00 LED wp w 1 a19 0 w 2 12 7 / 4248 post office city hall side of building Skip 0 w 2 - - w 0.0% - $0.00 unable to get on roof, no access beyond crane or scissor lift0 w 0 0 0 / 0 post office engineering Skip 0 w 0 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 electrical room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 mechanical room Skip 0 w 1 - - w 0.0% - $0.00 single switch 0 w 1 0 0 / 0 fire station 73 hallway Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 server room Skip 0 w 1 - - w 0.0% - $0.00 1 5 switch 0 w 1 0 0 / 0 fire station 73 apparztus room (garage) Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 medical storage room Skip 0 w 1 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 fire station 73 laundry room/workshop Skip 0 w 1 - - w 0.0% - $0.00 LED 4ft lin wrap w 1 t8 retrotube 0 w 1 3 7 / 1062 fire station 73 bathroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 bathroom Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 11 12 7 / 4248 police dept 1st floor lobby Skip 0 w 11 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 police dept 1st floor elevator mechanical room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 police dept 1st floor restroom Skip 0 w 1 - - w 0.0% - $0.00 LED 4ft lin wrap w 1 t8 retrotube 0 w 1 4 5 / 999 police dept 1st floor restroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 police dept 1st floor restroom Skip 0 w 1 - - w 0.0% - $0.00 2 triple switches 0 w 2 0 0 / 0 police dept 1st floor conference room Skip 0 w 2 - - w 0.0% - $0.00 double switch 0 w 1 0 0 / 0 police dept 1st floor storage room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 fire station 73 2nd floor workout room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor restroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 fire station 73 2nd floor office/storage room Skip 0 w 1 - - w 0.0% - $0.00 2 triple switches 0 w 2 0 0 / 0 fire station 73 2nd floor bedroom Skip 0 w 2 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 fire station 73 2nd floor office Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor hallway Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor laundry room Skip 0 w 1 - - w 0.0% - $0.00 1 triple switch 0 w 1 0 0 / 0 fire station 73 2nd floor kitchen/dining room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor bathroom Skip 0 w 1 - - w 0.0% - $0.00 LED 10in can w 1 a19 0 w 4 2 5 / 499 fire station 73 2nd floor bathroom Skip 0 w 4 - - w 0.0% - $0.00 1 double switch 0 w 1 0 0 / 0 fire station 73 2nd floor mechanical room Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor bedroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor bedroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor bedroom Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 1 0 0 / 0 fire station 73 2nd floor hose bay Skip 0 w 1 - - w 0.0% - $0.00 1 tripple switch 0 w 1 0 0 / 0 city hall first floor stoeage room Skip 0 w 1 - - w 0.0% - $0.00 wp w 2 t4 halogen 90 w 5 3 4 / 593 city hall first floor council chamber hallway LED Half Moon Sconce, 4000K, UNV 12 w 5 5 390 w 0.0% - $0.00 2x4 w 3 t8. 89 w 1 1 2 / 93 city hall 1st floor storage room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 31.5 w 1 3 58 w 64.6% 5.36 $1.86 2x4 w 3 t8. 89 w 4 6 4 / 1185 city hall 1st floor break room/kitchen 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 31.5 w 4 12 230 w 64.6% 272.65 $94.33 2x4 w 3 t8. 89 w 1 2 2 / 187 city hall 1st floor file storage room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 31.5 w 1 3 58 w 64.6% 10.73 $3.71 2x4 w 3 t8. 89 w 2 4 4 / 790 city hall 1st floor conference room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 31.5 w 2 6 115 w 64.6% 90.88 $31.44 2x4 w 3 t8. 89 w 2 1 1 / 41 city hall 2nd floor several room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 31.5 w 2 6 115 w 64.6% 4.73 $1.64 4ft lin w 1 t8. 31 w 1 1 1 / 41 city hall 1st floor electrical room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 1 1 21 w 66.1% 0.84 $0.29 4ft lin w 1 t8. 31 w 1 1 4 / 198 city hall 2nd floor storage closet 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 1 1 21 w 66.1% 4.05 $1.40 4ft lin w 1 t8. 31 w 5 9 4 / 1778 city hall first floor elevator/bathroom lobby 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 5 5 103 w 66.1% 182.26 $63.06 4ft lin w 1 t8. 31 w 7 9 4 / 1778 city hall first floor lobby 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 7 7 144 w 66.1% 255.16 $88.28 4ft lin w 1 t8. 31 w 1 1 1 / 41 city hall first floor storage closet 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 1 1 21 w 66.1% 0.84 $0.29 4ft lin wrap w 2 t8. 59 w 1 4 7 / 1460 Pinole PD dispatch bathroom 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 21 w 1 2 38 w 64.4% 55.48 $19.20 4ft lin w 1 t12. 43 w 1 1 1 / 52 police dept 1st floor elevator mechanical room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 1 1 33 w 75.6% 1.69 $0.59 4ft lin wrap w 2 t8. 59 w 4 6 5 / 1564 fire station 73 2nd floor bathroom 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 21 w 4 8 152 w 64.4% 237.77 $82.27 1x4 w 2 t8. 31 w 15 6 4 / 1185 city hall first floor council chamber hallway 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 10.5 w 15 15 308 w 66.1% 364.52 $126.12 2x4 w 2 t8. 59 w 3 10 4 / 2086 Pinole PD office 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 3 6 114 w 64.4% 237.77 $82.27 2x4 w 2 t8. 59 w 2 10 4 / 2086 Pinole PD office 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 2 4 76 w 64.4% 158.51 $54.84 2x4 w 2 t8. 59 w 2 10 4 / 2086 Pinole PD office 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 2 4 76 w 64.4% 158.51 $54.84 4ft lin wrap w 2 2ft t5. 34 w 1 12 7 / 4380 public safety building 2nd floor (police dept) office area at top of stairwell 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 1 2 13 w 38.2% 56.94 $19.70 4ft lin wrap w 2 t8. 59 w 8 10 5 / 2607 public safety building 1st floor (police dept) evidence office 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 8 16 304 w 64.4% 792.57 $274.22 4ft lin w 1 t8. 31 w 6 3 3 / 469 fire station 73 mechanical room 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 10.5 w 6 6 123 w 66.1% 57.72 $19.97 4ft lin wrap w 2 t8. 59 w 5 12 7 / 4380 fire station 73 apparztus room (garage) 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 5 10 190 w 64.4% 832.20 $287.93 4ft lin w 1 t8. 31 w 2 3 7 / 1095 fire station 73 medical storage room 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 10.5 w 2 2 41 w 66.1% 44.90 $15.53 4ft lin w 2 t8. 59 w 4 5 7 / 1825 fire station 73 laundry room/workshop 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 4 8 152 w 64.4% 277.40 $95.98 2x4 w 2 t8. 59 w 2 9 5 / 2346 fire station 73 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 21 w 2 4 76 w 64.4% 178.33 $61.70 4ft lin w 1 t8. 31 w 4 8 5 / 1998 city hall 1st floor mens bathroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 4 4 82 w 66.1% 163.81 $56.68
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size 27,508 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.35 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 0 KWh
Saved
Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - City Hall, Police Department, Fire Station 73 & Post Office 2131 Pear St
Pinole, CA 94564
Acct: 1194267547; SAID: 1196945891
# of
Lamps
4ft lin wrap w 1 t8. 31 w 3 8 5 / 1998 city hall 1st floor womens bathroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 3 3 62 w 66.1% 122.86 $42.51 2x4 w 2 t8. 59 w 2 8 4.5 / 1789 city hall 1st floor printer room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 135.97 $47.05 2x4 w 3 t8. 89 w 2 9 4.5 / 2013 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 231.47 $80.09 2x4 w 3 t8. 89 w 3 9 4 / 1778 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 3 9 173 w 64.6% 306.73 $106.12 2x4 w 3 t8. 89 w 6 9 4.5 / 2013 city hall 1st floor cubicle offices 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 6 18 345 w 64.6% 694.41 $240.26 2x4 w 3 t8. 89 w 2 9 4.5 / 2013 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 231.47 $80.09 2x4 w 3 t8. 89 w 2 9 4.5 / 2013 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 231.47 $80.09 2x4 w 3 t8. 89 w 2 9 4.5 / 2013 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 231.47 $80.09 2x4 w 3 t8. 89 w 2 9 4.5 / 2013 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 231.47 $80.09 2x4 w 3 t8. 89 w 3 9 4.5 / 2013 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 3 9 173 w 64.6% 347.21 $120.13 2x4 w 3 t8. 89 w 1 9 4 / 1778 city hall 1st floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 1 3 58 w 64.6% 102.24 $35.37 2x4 w 3 t8. 89 w 6 9 4 / 1778 city hall 1st floor 1st floor front desk 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 6 18 345 w 64.6% 613.46 $212.25 2x4 w 3 t8. 89 w 1 8 4 / 1581 city hall 2nd floor hallway to roof access 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 1 3 58 w 64.6% 90.88 $31.44 2x4 w 3 t8. 89 w 11 9 4 / 1778 city hall 2nd floor finance dept lobby 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 11 33 633 w 64.6% 1,124.68 $389.12 2x4 w 3 t8. 89 w 4 9 4 / 1778 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 4 12 230 w 64.6% 408.97 $141.50 2x4 w 3 t8. 89 w 6 9 4 / 1778 city hall 2nd floor cubicles 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 6 17 326 w 62.5% 560.71 $194.00 2x4 w 3 t8. 89 w 4 3 2 / 280 city hall 2nd floor conference room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 4 12 230 w 64.6% 64.37 $22.27 2x4 w 3 t8. 89 w 4 4 4 / 790 city hall 2nd floor file room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 4 11 211 w 61.4% 158.32 $54.78 2x4 w 3 t8. 89 w 2 10 4 / 1976 city hall 2nd floor printer room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 227.21 $78.61 4ft lin w 1 t8. 31 w 1 3 4 / 593 city hall 2nd floor genderr neutral bathrpom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 12.15 $4.20 2x4 w 3 t8. 89 w 3 9 4 / 1778 city hall 2nd floor city managers office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 3 9 173 w 64.6% 306.73 $106.12 2x4 w 3 t8. 89 w 2 9 1 / 370 city hall 2nd floor city attorney office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 42.58 $14.73 2x4 w 3 t8. 89 w 2 9 4 / 1778 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 204.49 $70.75 2x4 w 3 t8. 89 w 2 10 4 / 1976 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 227.21 $78.61 2x4 w 3 t8. 89 w 4 10 4 / 1976 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 4 12 230 w 64.6% 454.41 $157.22 2x4 w 3 t8. 89 w 4 10 4 / 1976 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 4 12 230 w 64.6% 454.41 $157.22 2x4 w 3 t8. 89 w 2 9 4 / 1778 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 204.49 $70.75 2x4 w 2 t8. 59 w 1 9 4 / 1778 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 28.8% 30.23 $10.46 2x4 w 2 t8. 59 w 2 9 4 / 1778 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 135.14 $46.76 2x4 w 3 t8. 89 w 1 9 4 / 1778 city hall 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 1 3 58 w 64.6% 102.24 $35.37 2x4 w 3 t8. 89 w 2 9 4 / 1778 city hall first floor office behind chambers 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 204.49 $70.75 2x4 w 2 t8. 59 w 2 4 3 / 626 Pinole PD server room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 47.55 $16.45 1x4 w 2 t8. 59 w 1 4 3 / 626 Pinole PD server room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 23.78 $8.23 2x4 w 2 t8. 59 w 2 10 5 / 2607 Pinole PD community outreach office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 198.14 $68.55 2x4 w 2 t8. 59 w 1 3 7 / 1095 Pinole PD dispatch break room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 41.61 $14.40 1x4 w 2 t8. 59 w 1 3 7 / 1095 Pinole PD dispatch break room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 41.61 $14.40 4ft lin w 1 t12. 43 w 1 4 5 / 1043 Pinole PD dispatch kitchen 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 33 w 75.6% 33.89 $11.73 1x4 w 2 t8. 59 w 1 11 5 / 2868 Pinole PD admin office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 108.98 $37.70 2x4 w 2 t8. 59 w 4 11 5 / 2868 Pinole PD admin office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 435.91 $150.82 2x4 w 3 t8. 89 w 3 6 5 / 1564 Pinole PD admin conference room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 3 9 173 w 64.6% 269.84 $93.36 2x4 w 2 t8. 59 w 13 12 5 / 3129 Pinole PD criminal investivations office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 13 26 494 w 64.4% 1,545.52 $534.72 1x4 w 2 t8. 59 w 2 12 5 / 3129 Pinole PD criminal investivations office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 237.77 $82.27 2x4 w 2 t8. 59 w 2 12 5 / 3129 Pinole PD detective office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 237.77 $82.27 2x4 w 2 t8. 59 w 2 12 5 / 3129 Pinole PD detective office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 237.77 $82.27 1x4 w 2 t8. 59 w 1 4 3 / 626 Pinole PD interview office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 23.78 $8.23 1x4 w 2 t8. 59 w 1 4 3 / 626 Pinole PD interview office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 23.78 $8.23 2x4 w 2 t8. 59 w 2 10 5 / 2607 Pinole PD training office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 198.14 $68.55 2x4 w 3 t8. 89 w 3 10 5 / 2607 Pinole PD training office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 3 9 173 w 64.6% 449.73 $155.60 4ft lin wrap w 2 t8. 59 w 2 12 7 / 4380 public safety building 2nd floor (police dept) office area at top of stairwell 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 332.88 $115.17 1x4 w 2 t8. 59 w 1 3 3 / 469 public safety building 2nd floor (police dept) archive file room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 17.83 $6.17 2x4 w 2 t8. 59 w 2 3 3 / 469 public safety building 2nd floor (police dept) archive file room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 35.67 $12.34 4ft lin wrap w 2 t8. 59 w 2 3 3 / 469 public safety building 2nd floor (police dept) archive file room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 35.67 $12.34 1x4 w 2 t8. 59 w 2 12 7 / 4380 public safety building 2nd floor (police dept) conference room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 332.88 $115.17 2x4 w 2 t8. 59 w 3 12 7 / 4380 public safety building 2nd floor (police dept) conference room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 3 6 114 w 64.4% 499.32 $172.76 1x4 w 2 t8. 59 w 1 12 7 / 4380 public safety building 2nd floor (police dept) conference room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 166.44 $57.59 2x4 w 2 t8. 59 w 1 1 1 / 52 public safety building 2nd floor (police dept) interview room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 1.98 $0.69 2x4 w 2 t8. 59 w 2 10 5 / 2607 public safety building 1st floor (police dept) evidence office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 198.14 $68.55 4ft lin wrap w 2 t8. 59 w 10 10 5 / 2607 public safety building 1st floor (police dept) evidence locker 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 10 20 380 w 60.8% 935.97 $323.83 4ft lin wrap w 2 t8. 59 w 20 9 7 / 3285 public safety building 1st floor (police dept) mens locker room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 20 40 760 w 64.4% 2,496.60 $863.79 4ft lin wrap w 2 t8. 59 w 14 9 7 / 3285 public safety building 1st floor (police dept) mens locker room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 14 28 532 w 64.4% 1,747.62 $604.65 4ft lin wrap w 2 t8. 59 w 13 12 7 / 4380 public safety building 1st floor (police dept) hallway 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 13 26 494 w 64.4% 2,163.72 $748.61 4fr lin w 2 t8. 59 w 2 2 7 / 730 public safety building 1st floor (police dept) armory 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 55.48 $19.20 4ft lin w 1 t8. 31 w 1 12 7 / 4380 fire station 73 hallway 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 89.79 $31.07 4ft lin w 2 t8. 59 w 4 1 1 / 52 fire station 73 server room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 7.93 $2.74 4ft lin w 1 t12. 43 w 1 12 7 / 4380 fire station 73 apparztus room (garage) 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 33 w 75.6% 142.35 $49.25 4ft lin wrap w 1 t8. 31 w 1 4 5 / 1043 police dept 1st floor restroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 21.38 $7.40 2x4 w 2 t8. 59 w 16 4 3 / 626 police dept 1st floor conference room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 16 32 608 w 64.4% 380.43 $131.62 2x4 w 3 t8. 89 w 3 1 1 / 52 police dept 1st floor storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 3 9 173 w 64.6% 8.99 $3.11 2x4 w 2 t8. 59 w 1 9 5 / 2346 fire station 73 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 89.16 $30.85 2x4 w 2 t8. 59 w 1 9 5 / 2346 fire station 73 2nd floor workout room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 28.8% 39.89 $13.80 4ft lin w 2 t8. 59 w 1 3 5 / 782 fire station 73 2nd floor restroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 29.72 $10.28 2x4 w 2 t8. 59 w 1 6 5 / 1564 fire station 73 2nd floor office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 1 19 w 28.8% 13.30 $4.60 1x4 w 2 t8. 59 w 1 3 3 / 469 fire station 73 2nd floor office/storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 17.83 $6.17 2x4 w 2 t8. 59 w 2 3 3 / 469 fire station 73 2nd floor office/storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 35.67 $12.34
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Communiyt Dev. Director 0 Approx. Building Size 27,508 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.35 /kWh
Customer Email: [email protected] 0 Interest Rate 0% 0 In Reference to Quote # 0 KWh
Saved
Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - City Hall, Police Department, Fire Station 73 & Post Office 2131 Pear St
Pinole, CA 94564
Acct: 1194267547; SAID: 1196945891
# of
Lamps
2x4 w 2 t8. 59 w 4 6 7 / 2190 fire station 73 2nd floor bedroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 332.88 $115.17 2x4 w 2 t8. 59 w 1 4 5 / 1043 fire station 73 2nd floor laundry room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 39.63 $13.71 2x4 w 2 t8. 59 w 5 9 5 / 2346 fire station 73 2nd floor kitchen/dining room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 5 10 190 w 64.4% 445.82 $154.25 4ft lin w 1 t8. 31 w 1 2 3 / 313 fire station 73 2nd floor mechanical room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 6.41 $2.22 2x4 w 2 t8. 59 w 2 4 7 / 1460 fire station 73 2nd floor bedroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 110.96 $38.39 2x4 w 3 t8. 89 w 2 4 7 / 1460 fire station 73 2nd floor bedroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 167.90 $58.09 2x4 w 3 t8. 89 w 2 4 7 / 1460 fire station 73 2nd floor bedroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 31.5 w 2 6 115 w 64.6% 167.90 $58.09 4ft lin wrap w 2 t8. 59 w 6 12 7 / 4380 fire station 73 2nd floor hose bay 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 6 12 228 w 64.4% 998.64 $345.51 4ft lin w 1 t12. 43 w 4 1 3 / 156 fire station 73 electrical room LED 8' Linear Fixture, 35K, 4K, 5K, UNV 32 w 2 2 108 w 62.8% 16.89 $5.85 4ft lin w 4 t8. 112 w 26 12 7 / 4380 fire station 73 apparztus room (garage) LED 8' Linear Fixture, 35K, 4K, 5K, UNV 32 w 13 13 2,496 w 85.7% 10,932.49 $3,782.48 3ft lin w 1 t8. 26 w 1 3 4 / 593 city hall 2nd floor genderr neutral bathrpom 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 1 1 14 w 53.8% 8.30 $2.87 3ft lin wrap w 1 t8. 26 w 2 20 7 / 7080 city hall first floor mens bathroom 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 2 2 28 w 53.8% 198.24 $68.59 3ft lin wrap w 1 t8. 26 w 2 20 7 / 7080 city hall first floor womens bathroom 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 2 2 28 w 53.8% 198.24 $68.59 3ft lin w 1 t8. 26 w 4 9 4 / 1778 city hall first floor lobby 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 4 4 56 w 53.8% 99.58 $34.45 3ft lin w 1 t8. 26 w 2 3 4 / 593 city hall first floor bathroom 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 2 2 28 w 53.8% 16.60 $5.74 0 0 w 0 0 0 / 0 0 0 0 0 w 0 - - w 0.0% - $0.00
Totals 925 Ave: 3288 w 911 24,507 w 66.6% 57,703.60 $19,964.57 24,507 Estimated Watts Saved Total Project Cost $194,030.05 Approximate Energy Savings Per Month 57,704 Estimated Annual kWh Saved Total After Rebate/Incentive Project Cost $194,030.05 Estimated Energy Savings Per Year
7.0 Estimated Avg Annual Res Powered by Savings ****Estimated Program Payback Period Yrs. 9.72 **Estimated Total Savings Over 5 Years 43 Estimated Annual CO2 Savings (MT) ** Estimated Total Savings After 10 Years 15,624,371 Estimated Btu Savings Per Month Estimated Energy Rebate
66.6% Estimated Average Electrical Savings Estimated IRS Tax Deduction 179D Available
10.3% Estimated ***Estimated Federal Tax Savings
9.72 Estimated Payback Period Yrs. - No Rebates, Tax Deductions or Bulb Replacement Savings Estimated Bulb Replacement Savings Per Year
9.21 Estimated Payback Period Yrs. Fully Comprehensive^ ^^ Estimated Bulb Replacement Savings Per Avg. Est. Life of LED Estimated Loan Payment
*** Based on IRS 179D Deduction @ 35% federal tax rate NOTE: Attached calculations do not include depreciation deduction for project cost. ****Program Payback Period Yrs. = (Total Project Cost - Available Program Rebates or Incentives) / Estimated $ Saved per Year *Payment is based on a 9.72 year loan at 0% interest OAC, actual my vary. ^Payback Period Yrs. = (Total Project Cost - Available Rebate or Incentive - Tax Savings) / (Estimated Savings Per Year + Bulb Replacement Savings Per Yr.) ** Reflects energy savings per year increasing at industry standard 6% per year + Bulb Replacement ^^Based on industry standard LED lifespan of 50,000 hrs. $468.70
$46,775.26
$5,776.68
$112,542.13
$263,148.88
$0.00
$16,504.80
$1,644.32
$1,663.71
$19,964.57
Site Five: Senior Center
Figure 1.5. City of Pinole – Senior Center, 2500 Charles Ave, Pinole, CA 94564.
EcoGreen’s scope of work will include retrofitting the facility’s walk-in coolers by replacing the existing PSC evaporator fan motors with high-efficiency electronically commutated permanent magnet (EC) motors. These EC motor retrofits provide integrated speed control to optimize airflow and energy use in response to refrigeration load, improving performance while reducing power draw and heat gain in the refrigerated space. EcoGreen will also replace outdated lighting with modern, energy-efficient LED fixtures. Together, these upgrades will improve overall energy efficiency, reduce operating costs, and enhance the building’s environmental sustainability.
Quote
201336
27671 La Paz Rd, Suite 100 11/12/2025
Laguna Niguel, CA. 92677
[email protected]
(949) 364 - 6800
Quotes are valid for 30 days from the above date.
EGMT-GW9-1/15H-OG Interior EC Motor 1/15 HP Cooler, 0 w 6 $335.00 $2,010.00 EGCT-GWCL-FCTL 0 Fan Motor Controller 0 w 3 $397.00 $1,191.00 EGTU-TS12-3ft-5000-UNV-T8-B Interior 3' T8 LED Tube Bypass (Type B), 5000K, UNV 12 w 6 $13.59 $81.54 EGTU-TC10-4ft-5000-T8-B Interior 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 225 $9.97 $2,243.25 EGCL-ML11-8"-CS-UNV-REC Interior LED 8" Can Downlight,2700K,3000K,3500K,4000K,5000K, REC 11 w 1 $115.00 $115.00 EGTU-TC10-4ft-4000-T8-B Interior 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 10.5 w 6 $9.97 $59.82 EGCL-ML10-6"-CS-UNV-REC Interior LED 6" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 10 w 2 $105.00 $210.00 EGPL-GC10.5-3500-UNV-H Interior LED Horizontal PL Replacement, 3500K, UNV, w/ 2 Pin Adaptor 10 w 32 $23.00 $736.00 EGTU-TC9-2ft-5000-T8-B Interior 2' T8 LED Tube Single Ended Bypass(Type B), 5000K 9 w 8 $11.49 $91.92 EGTL-LT8.7-3000-120V-WHT-H Interior LED Spot Track Lighting, 3000K, UNV, White, H-System 8.7 w 10 $197.00 $1,970.00 EGWP-ML15-CS-UNV-PH Exterior LED Wallpack, 4K, 5K, UNV, PH 15.5 w 5 $115.00 $575.00 EGCP-AL27-5000-UNV Exterior LED Canopy Light, 5000K, UNV 27 w 2 $155.00 $310.00 EGED-X-X 0 Emergency Driver 0 w 10 $150.00 $1,500.00
EGTU-TC10-4ft-3500-T8-B Interior 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 2 $9.97 $19.94 EGTU-TC10-4ft-3500-T8-B Interior 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 2 $9.97 $19.94 EGTU-ML16-2ft-5000-U-A Interior 2' U-Bend Lamp (Type B) 5000K 15.5 w 28 $29.75 $833.00 0 0 0 0 w 0 $0.00 $0.00
0 0 0 0 w 0 $0.00 $0.00
* All quantities to be verified by owner SUBTOTAL $11,966.41 LABOR $31,486.56
SALES TAX Included
(Brackets, Wiring, Sockets, Electrician Travel, Tiewire, Screws, Lifts, Lamp Recycling / Disposal, Shipping, Package, ETC.) MISC. CHARGES $8,788.34 3rd Party QA Review $2,000.00
TOTAL PROJECT COST $54,241.31
Estimated IRS Federal Tax Deduction per 179D: $4,440.60 Estimated Annual Energy Savings: $5,491.30
SIGNATURE: _________________________________________________________________________________ DATE:___________________________ WHEN SIGNED OR APPROVED BY CLIENT, THIS FORM BECOMES AN OFFICIAL ORDER AND A LEGALLY BINDING COMMITMENT SUBJECT TO THE TERMS AND CONDITIONS OF THIS FORM. BY ACCEPTING THIS PROJECT AND MOVING FORWARD, CUSTOMER AGREES TO HAVE ECOGREEN SOLUTIONS PURCHASE AND INSTALL THE PRODUCTS LISTED ABOVE. All returned checks are subject to a $20 service charge. If customer is utilizing a utility program where they default or get disqualified post install and the pre approved utility funding is canceled, the customer is liable for the project amount in full and the terms and conditions above will need to be met. Subject to collections and or litigation. If this invoice is not paid in full when due, a 1.5% per month late charge will be imposed. In this event, customer will be liable to pay reasonable collection charge, attorney fee and court cost. Warranty to be serviced by factory (see EcoGreen Scope of Work and warranty statement provided by the factory).
TERMS AND CONDITIONS
Quote #
DATE
CITY OF PINOLE
City of Pinole - Senior Center
Amount
2500 Charles Ave
Pinole, CA 94564
Acct: 9840139961; SAID: 9845996180
Light EPN INT/
EXT DESCRIPTION QTY* Unit Price
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Community Dev. Director 0 Approx. Building Size 7,401 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.39 /kWh
Customer Email: 0 0 Interest Rate 0% 0 In Reference to Quote # 201336 KWh
Saved
3ft lin wrap w 2 t8. 46 w 3 10 5 / 2490 Pinole Senior Center Room 113. 3' T8 LED Tube Bypass (Type B), 5000K, UNV 24 w 3 6 66 w 47.8% 164.34 $64.64 1 triple switch 0 w 0 0 0 / 0 Pinole Senior Center Room 113. Skip 0 w 0 - - w 0.0% - $0.00 4ft lin wrap w 2 t8. 59 w 2 10 5 / 2490 Pinole Senior Center entrance/exit hallway 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 189.24 $74.43 4ft lin w 1 t8. 31 w 1 1 1 / 41 Pinole Senior Center storage/mechanical room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 1 1 21 w 66.1% 0.84 $0.33 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage/mechanical room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t12. 72 w 1 1 1 / 41 Pinole Senior Center storage/IT room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 51 w 70.8% 2.09 $0.82 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage/IT room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t8. 31 w 2 1 1 / 41 Pinole Senior Center storage/electrical room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 2 2 41 w 66.1% 1.68 $0.66 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage/electrical room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t8. 31 w 1 1 1 / 41 Pinole Senior Center furnace room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 0.84 $0.33 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center furnace room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin wrap w 1 t8. 31 w 11 10 5 / 2490 Pinole Senior Center front lobby/reception 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 11 11 226 w 66.1% 561.50 $220.85 4ft lin wrap w 1 t8. 31 w 28 10 5 / 2490 Pinole Senior Center main lobby 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 28 28 574 w 66.1% 1,429.26 $562.17 1 quad switch 0 w 0 0 0 / 0 Pinole Senior Center main lobby Skip 0 w 0 - - w 0.0% - $0.00 8in can w 2 cfl 17 w 1 10 5 / 2490 Pinole Senior Center alcove (in front lobby) LED 8" Can Downlight,2700K,3000K,3500K,4000K,5000K, REC 11 w 1 1 6 w 35.3% 14.94 $5.88 8ft lin wrap w 2 4ft t8. 59 w 1 1 1 / 41 Pinole Senior Center storage closet 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 1.56 $0.61 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage closet Skip 0 w 0 - - w 0.0% - $0.00 1x4 w 1 t8. 31 w 6 10 5 / 2490 Pinole Senior Center office hallway 4' T8 LED Tube Double Ended Bypass(Type B), 4000K, UNV 10.5 w 6 6 123 w 66.1% 306.27 $120.46 1x4 box w 2 t8. 59 w 2 6 1 / 246 Pinole Senior Center salon 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 18.70 $7.35 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center salon Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t8. 31 w 1 3 5 / 747 Pinole Senior Center janitorial closet 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 15.31 $6.02 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center janitorial closet Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 3.5 10 5 / 2490 Pinole Senior Center administrative office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 3.5 7 133 w 59.3% 305.03 $119.98 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center administrative office Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 4 10 5 / 2490 Pinole Senior Center recreation coordinator office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 378.48 $148.87 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center recreation coordinator office Skip 0 w 0 - - w 0.0% - $0.00 4ft lin wrap w 2 t8. 59 w 2 4 3 / 580 Pinole Senior Center room 103. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 44.08 $17.34 4ft lin wrap w 2 t8. 59 w 4 4 3 / 580 Pinole Senior Center room 103. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 88.16 $34.68 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center room 103. Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 2 6 5 / 1494 Pinole Senior Center break room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 113.54 $44.66 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center break room Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 4 4 3 / 580 Pinole Senior Center directors office 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 88.16 $34.68 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center directors office Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 2 3 5 / 747 Pinole Senior Center employee restroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 56.77 $22.33 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center employee restroom Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 1 8 5 / 1992 Pinole Senior Center office exit hallway 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 75.70 $29.77 4ft lin wrap w 2 t8. 59 w 1 4 3 / 580 Pinole Senior Center lobby to activity room 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 21 w 1 2 38 w 64.4% 22.04 $8.67 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center lobby to activity room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t8. 31 w 1 1 1 / 41 Pinole Senior Center storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 0.84 $0.33 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage room Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 2 1 1 / 41 Pinole Senior Center storage room 110. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 2 4 76 w 64.4% 3.12 $1.23 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center storage room 110. Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 4 1 1 / 41 Pinole Senior Center storage room 111. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 6.23 $2.45 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center storage room 111. Skip 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 4 4 5 / 996 Pinole Senior Center small activity room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 151.39 $59.55 4ft lin wrap w 1 t8. 31 w 4 4 5 / 996 Pinole Senior Center small activity room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 4 4 82 w 66.1% 81.67 $32.12 1 triple switch, 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center small activity room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t12. 72 w 1 2 5 / 498 Pinole Senior Center storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 51 w 70.8% 25.40 $9.99 4ft lin w 1 t8. 31 w 1 2 5 / 498 Pinole Senior Center storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 1 1 21 w 66.1% 10.21 $4.02 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage room Skip 0 w 0 - - w 0.0% - $0.00 2x4 box w 2 t8. 59 w 0.5 10 5 / 2490 Pinole Senior Center lobby for restrooms, room 100. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 0.5 1 19 w 28.8% 21.17 $8.32 8in can w 2 cfl 31 w 2 10 5 / 2490 Pinole Senior Center lobby for restrooms, room 100. LED 6" Can Downlight 2700K/3000K/3500K/4000K/5000K, 120-277V WITH 0-10V DIMMING 10 w 2 2 42 w 67.7% 104.58 $41.13 4ft lin wrap w 1 t8. 31 w 5 10 5 / 2490 Pinole Senior Center mens restroom 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 5 5 103 w 59.4% 229.08 $90.10 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center mens restroom Skip 0 w 0 - - w 0.0% - $0.00 4x4 w 4 t8. 112 w 14 10 5 / 2490 Pinole Senior Center room 100. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 42 w 14 56 980 w 57.1% 2,231.04 $877.53 sconce w 2 cfl 31 w 15 10 5 / 2490 Pinole Senior Center room 100. LED Horizontal PL Replacement, 3500K, UNV, w/ 2 Pin Adaptor 20 w 15 30 165 w 31.2% 361.05 $142.01 2x2 w 2 t8 utube 59 w 14 10 5 / 2490 Pinole Senior Center kitchen 2' U-Bend Lamp (Type B) 5000K 31 w 14 28 392 w 47.5% 976.08 $383.92 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center kitchen Skip 0 w 0 - - w 0.0% - $0.00 LED vpt jelly jar w 1 a19 0 w 7 6 5 / 1494 Pinole Senior Center kitchen Skip 0 w 7 - - w 0.0% - $0.00 1 double switch, 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center kitchen Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t8. 31 w 1 1 5 / 249 Pinole Senior Center janitorial closet 4' T8 LED Tube Double Ended Bypass(Type B), 3500K, UNV 10.5 w 1 1 21 w 66.1% 5.10 $2.01 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center janitorial closet Skip 0 w 0 - - w 0.0% - $0.00 LED vpt jelly jar w 1 a19 0 w 1 1 1 / 41 Pinole Senior Center out of commission walk-in Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center out of commission walk-in Skip 0 w 0 - - w 0.0% - $0.00 ECM's 0 w 0 0 0 / 0 Pinole Senior Center out of commission walk-in EC Motor 1/15 HP Cooler, 0 w 0 - - w 13.1% 494.00 $194.30 4ft lin wrap w 2 t8. 59 w 1.5 2 5 / 498 Pinole Senior Center office/storage room 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1.5 3 57 w 52.5% 23.16 $9.11 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center office/storage room Skip 0 w 0 - - w 0.0% - $0.00 4ft lin wrap w 2 t8. 59 w 4 6 5 / 1494 Pinole Senior Center dishes area 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 227.09 $89.32 1 double switch 0 w 0 0 0 / 0 Pinole Senior Center dishes area Skip 0 w 0 - - w 0.0% - $0.00 LED vpt jelly jar w 1 a19 0 w 1 2 5 / 498 Pinole Senior Center walk in fridge Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center walk in fridge Skip 0 w 0 - - w 0.0% - $0.00 ECM's 0 w 0 0 0 / 0 Pinole Senior Center walk in fridge EC Motor 1/15 HP Cooler, 0 w 0 - - w 13.1% 494.00 $194.30 LED vpt jelly jar w 1 a19 0 w 1 2 5 / 498 Pinole Senior Center walk in freezer Skip 0 w 1 - - w 0.0% - $0.00 1 single switch 0 w 0 0 0 / 0 Pinole Senior Center walk in freezer Skip 0 w 0 - - w 0.0% - $0.00 ECM's 0 w 0 0 0 / 0 Pinole Senior Center walk in freezer Skip 0 w 0 - - w 0.0% - $0.00 LED wrap 0 w 0 0 0 / 0 Pinole Senior Center storage room (led) Skip 0 w 0 - - w 0.0% - $0.00 2ft lin wrap w 2 t8. 33 w 4 6 5 / 1494 Pinole Senior Center dishes area 2' T8 LED Tube Single Ended Bypass(Type B), 5000K 18 w 4 8 60 w 45.5% 89.64 $35.26 track lighting w1 a19 40 w 10 6 5 / 1494 Pinole Senior Center gift shop LED Spot Track Lighting, 3000K, UNV, White, H-System 8.7 w 10 10 313 w 78.3% 467.62 $183.93 1x4 box w 2 t8. 59 w 1 2 5 / 498 Pinole Senior Center storage hallway room 100. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 1 2 38 w 64.4% 18.92 $7.44 single switch 0 w 0 0 0 / 0 Pinole Senior Center storage hallway room 100. Skip 0 w 0 - - w 0.0% - $0.00 4ft lin w 1 t8. 31 w 2 1 1 / 41 Pinole Senior Center storage room in room 100. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 10.5 w 2 2 41 w 66.1% 1.68 $0.66 Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - Senior Center
2500 Charles Ave
Pinole, CA 94564
Acct: 9840139961; SAID: 9845996180
# of
Lamps
EcoGreen Sales Rep: Andrew Guercio 0
Customer Contact: Lilly Whalen 0
Title of Contact: Community Dev. Director 0 Approx. Building Size 7,401 SF Customer Phone: 510-954-6450 0 Energy Rate $ 0.39 /kWh
Customer Email: 0 0 Interest Rate 0% 0 In Reference to Quote # 201336 KWh
Saved
Existing Operating
Hours-Day / Yr. Existing Watts/ Fix
# of
Fixtures
Watts/bulbs
Saved Room/Area Suggested Replacement Watts/Fix Usage Saved Suggested Replacements Savings
ENERGY AUDIT
EXISTING Location
Building/Zone Annual Savings # of
Fixtures
CITY OF PINOLE
City of Pinole - Senior Center
2500 Charles Ave
Pinole, CA 94564
Acct: 9840139961; SAID: 9845996180
# of
Lamps
single switch 0 w 0 0 0 / 0 Pinole Senior Center storage room in room 100. Skip 0 w 0 - - w 0.0% - $0.00 wp w 1 hps 66 w 3 11 7 / 4088 Pinole Senior Center building exterior LED Wallpack, 4K, 5K, UNV, PH 15.5 w 3 3 152 w 76.5% 619.40 $243.63 wp w 1 hps 66 w 2 11 7 / 4088 Pinole Senior Center building exterior LED Wallpack, 4K, 5K, UNV, PH 15.5 w 2 2 101 w 76.5% 412.93 $162.42 LED wp w 1 a19 0 w 18 12 7 / 4236 Pinole Senior Center building exterior Skip 0 w 18 - - w 0.0% - $0.00 lb w 1 hps 95 w 2 11 7 / 4088 Pinole Senior Center building exterior LED Canopy Light, 5000K, UNV 27 w 2 2 136 w 71.6% 556.03 $218.70 LED dual head pole w 2 corncob 0 w 3 12 7 / 4236 Pinole Senior Center parking lot Skip 0 w 3 - - w 0.0% - $0.00 LED single head pole w 1 corncob 0 w 7 12 7 / 4236 Pinole Senior Center walkway around building Skip 0 w 7 - - w 0.0% - $0.00 LED single head pole w 1 corncob 0 w 1 12 7 / 4236 Pinole Senior Center walkway around building Skip 0 w 1 - - w 0.0% - $0.00 LED wp w 1 corncob 0 w 3 12 7 / 4236 Pinole Senior Center building exterior Skip 0 w 3 - - w 0.0% - $0.00 LED wp w 1 corncob 0 w 1 12 7 / 4236 Pinole Senior Center building exterior Skip 0 w 1 - - w 0.0% - $0.00 HVAC 0 w 0 0 0 / 0 Pinole senior center engineering PENDING 0 w 0 - - w 0.0% - $0.00 1x4 box w 2 t8. 59 w 4 10 5 / 2490 Pinole Senior Center Room 113. 4' T8 LED Tube Double Ended Bypass(Type B), 5000K, UNV 21 w 4 8 152 w 64.4% 378.48 $148.87 0 0 w 0 0 0 / 0 0 0 Emergency Driver 0 w 0 - - w 0.0% - $0.00 0 0 w 0 0 0 / 0 0 0 3rd Party QA Review 0 w 0 - - w 0.0% - $0.00 ECM's 0 w 0 0 0 / 0 0 Cooler EC Motor 1/15 HP Cooler, 0 w 0 - - w 14.5% 494.00 $194.30 0 0 w 0 0 0 / 0 0 0 Fan Motor Controller 0 w 0 - - w 0.0% 532.88 $209.60 0 0 w 0 0 0 / 0 0 0 Fan Motor Controller 0 w 0 - - w 0.0% 532.88 $209.60 0 0 w 0 0 0 / 0 0 0 Fan Motor Controller 0 w 0 - - w 0.0% 532.88 $209.60 0 0 w 0 0 0 / 0 0 0 0 0 w 0 - - w 0.0% - $0.00
0 0 w 0 0 0 / 0 0 0 0 0 w 0 - - w 0.0% - $0.00
Totals 228.5 Ave: 2888 w 228.5 5,708 w 47.9% 13,961.08 $5,491.30 5,708 Estimated Watts Saved Total Project Cost $54,241.31 Approximate Energy Savings Per Month 13,961 Estimated Annual kWh Saved Total After Rebate/Incentive Project Cost $54,241.31 Estimated Energy Savings Per Year
1.7 Estimated Avg Annual Res Powered by Savings ****Estimated Program Payback Period Yrs. 9.88 **Estimated Total Savings Over 5 Years 10 Estimated Annual CO2 Savings (MT) ** Estimated Total Savings After 10 Years - Estimated Btu Savings Per Month Estimated Energy Rebate
47.9% Estimated Average Electrical Savings Estimated IRS Tax Deduction 179D Available
10.1% Estimated ***Estimated Federal Tax Savings
9.88 Estimated Payback Period Yrs. - No Rebates, Tax Deductions or Bulb Replacement Savings Estimated Bulb Replacement Savings Per Year
9.38 Estimated Payback Period Yrs. Fully Comprehensive^ ^^ Estimated Bulb Replacement Savings Per Avg. Est. Life of LED Estimated Loan Payment
*** Based on IRS 179D Deduction @ 35% federal tax rate NOTE: Attached calculations do not include depreciation deduction for project cost. ****Program Payback Period Yrs. = (Total Project Cost - Available Program Rebates or Incentives) / Estimated $ Saved per Year *Payment is based on a 9.88 year loan at 0% interest OAC, actual my vary. ^Payback Period Yrs. = (Total Project Cost - Available Rebate or Incentive - Tax Savings) / (Estimated Savings Per Year + Bulb Replacement Savings Per Yr.) ** Reflects energy savings per year increasing at industry standard 6% per year + Bulb Replacement ^^Based on industry standard LED lifespan of 50,000 hrs. $128.55
$90,538.32
$1,554.21
$30,954.97
$72,379.70
$0.00
$4,440.60
$452.01
$457.61
$5,491.30