Cities Index.
Agenda packet

Pittsburg City Council
October 6, 2025

Document
Agenda packet
Meeting
October 6, 2025
Body
Pittsburg City Council
Pages
178
Original file
7.9 MB
Text extracted from the city's file for reading and search. Open the original on pittsburgca.api.civicclerk.com. That file is the official record.

CITY OF PITTSBURG
AGENDA

OCTOBER 6, 2025

CITY HALL COUNCIL CHAMBER
65 CIVIC AVENUE, PITTSBURG, CA

CLOSED SESSION
5:30 PM

REGULAR MEETING
7:00 PM

CITY COUNCIL

PITTSBURG ARTS AND COMMUNITY FOUNDATION

PITTSBURG POWER COMPANY

SOUTHWEST PITTSBURG GEOLOGIC HAZARD ABATEMENT DISTRICT II

SUCCESSOR AGENCY

PRESIDING

Jelani Killings, Mayor/Chair
Dionne Adams, Vice-Mayor/Chair
Angelica Lopez, Council Member/Board Member
Juan Antonio Banales, Council Member/Board Member
Arlene Kobata, Council Member/Board Member

FOR HOUSING AUTHORITY:

S.L. Floyd, Housing Authority Member
Annie Hill Herring, Housing Authority Member

Pittsburg City Council regular meetings are held the first and third Mondays of each month at 7:00 p.m. The Housing Authority meets in conjunction with the City Council on the third Monday of each month. The Pittsburg City Council meets regularly in the Council Chamber at 65 Civic Avenue, unless otherwise noted above. The City Council also sits as the Board of Directors of several other City agencies. The stipends for all agency members conform to state statutes governing compensation amounts. All other Agencies meet on an as needed basis and will be listed above if applicable. Copies of the open session agenda packets, which are distributed to the City Council, are on file in the office of the City Clerk, 65 Civic Avenue, Pittsburg, California, and are available for public inspection, beginning 72 hours in advance, during normal business hours (8:00 a.m. – 5:00 p.m., Monday through Friday, except from noon to 1:00 p.m. and City holidays). The agenda and reports are also located on the City’s website at www.pittsburgca.gov. Additionally, if any reports or documents, which are public records, are distributed to the City Council less than 72 hours before the meeting, those reports and documents will also be available for public inspection in the City Clerk’s Office and on the day of the meeting in the Council Chamber at the public counter area below the dais.

Page 1 of 178 ends

AUDIENCE REMARKS
The Audience Remarks period is for the public to comment on any items scheduled to be heard during the Closed Session portion of the meeting, if applicable.

5:30 PM - CONVENE IN CLOSED SESSION

1. PUBLIC EMPLOYMENT Pursuant to Section 54957
City Manager
7:00 PM - CONVENE IN OPEN SESSION FOR REGULAR MEETING

CALL TO ORDER

ROLL CALL

PLEDGE OF ALLEGIANCE

PROCLAMATIONS
The standing proclamation(s) were published as part of the agenda. The proclamation(s) will be posted on the City's website and social media accounts as appropriate.

2. Inspire Pittsburg - Pittsburg Italian American Club

3. National Italian-American Heritage Month

4. National Breast Cancer Awareness Month

5. National Arts and Humanities Month

6. California Clean Air Day

PRESENTATIONS

7. The Friends of Isola delle Femmine

8. Presentation on Temporary Outdoor Food Vendors

CITY MANAGER REPORTS/REMARKS
The City Manager may make brief announcements or informal comments at this time and brief the Council on items of interest. (No Action Required)

PUBLIC COMMENTS
Members of the audience who wish to address the City Council or Agency Boards on issues that are not scheduled for the agenda and on any items listed as part of the Consent Calendar should complete a Speaker's Card available at the dais. Please read the card carefully in order to fill out the card properly. Submit the completed card to the City Clerk before the item is called, preferably before the meeting begins. Individuals will be given three minutes to address the Council unless additional time is allowed as provided for spokespersons. Prior to speaking, each member of the public shall state their name and business and City of residence in a clear and audible tone of voice. (No Action Required)

Page 2 of 178 ends

COMMITTEE REPORTS
Council Members may make a report on their committee assignments at this time. (see attached list of adhoc committees and other public agencies in which Council members participate). (No Action Required)

COMBINED CITY COUNCIL AND PITTSBURG POWER COMPANY PUBLIC

HEARING

9. Adoption of a City Council Resolution Authorizing the City Manager to Execute the Economic Development Incentive Agreement with Cielo Supermarket Pittsburg, Inc. for the Highland Square Shopping Center and Adopting the Economic Development Subsidy Report and Adoption of a Pittsburg Power Company Resolution Authorizing the Transfer of Funds to Finance the Economic Development Incentive Agreement

The Highland Square Shopping Center serves as the primary neighborhood commercial center for Pittsburg residents who live along Buchanan Road. The 58,000-square-foot commercial anchor space has been vacant since 2019, and remains vacant due to the COVID-19 Pandemic and economic market factors surrounding big-box retail spaces. In 2024, Cielo Supermarkets ("Cielo") began negotiations to lease approximately 25,000 square feet of the anchor space to open a supermarket and approached the City seeking financial assistance. Staff is proposing an incentive package totaling $120,000. Pursuant to state law, the amount of the incentive in relation to the overall $6.2 million project is low and does not trigger prevailing wages.

CONSIDERATION

10. Adoption of a City Council Resolution Authorizing Execution of a Reimbursement Agreement with East Contra Costa Regional Fee and Financing Authority for Project 2019 – BART Pedestrian and Bicycle Connectivity

The East Contra Costa Regional Fee and Financing Authority (ECCRFFA) supports the establishment and administration of a uniform regional development fee program that funds and implements regional road improvement projects in the East County area. This resolution will authorize the execution of a Reimbursement Agreement between ECCRFFA and the City of Pittsburg to fund the design phase for Project 2019 – BART Pedestrian and Bicycle Connectivity (Project).

CONFLICT OF INTEREST STATEMENT
City Council/Agency Members may make any conflict of interest declarations pertaining to Consent Calendar items at this time.

Page 3 of 178 ends

COMBINED CITY COUNCIL, PITTSBURG ARTS AND COMMUNITY

FOUNDATION, PITTSBURG POWER COMPANY, SOUTHWEST PITTSBURG

GHAD II AND SUCCESSOR AGENCY CONSENT CALENDAR

11. Minutes of September 15, 2025

12. Adoption of a City Council Resolution Authorizing Execution of Consulting Services Agreement with Raney Planning & Management, Inc. for California Environmental Quality Act (CEQA) Analysis and Permitting for Project 3038 - West Leland Road Extension Phase II

Project 3038 - West Leland Road Extension Phase II (Project) is the construction of an extension of West Leland Road, from Santa Teresa Drive to Avila Road, to enhance traffic circulation. The Project requires analysis of environmental impact under California Environmental Quality Act (CEQA) and permitting for construction. Adoption of this Resolution will authorize the City Manager to execute a Consulting Services Agreement (Agreement) with Raney Planning & Management, Inc. for CEQA analysis and permitting for the Project.

13. Adoption of a City Council Resolution Authorizing Execution of the First Amendment to the General Services Agreement with Operational Technical Services for Specialty Temporary Staffing Services at the Water Treatment Plant

The Water Treatment Plant has two vacant positions in the Water Quality Lab.

The City entered into a General Services Agreement (Agreement) with Operational Technical Services (OTS) for specialty temporary staffing services and needs to execute a First Amendment to increase the compensation to extend the services while regular staff recruitment is completed.

14. Adoption of a City Council Resolution Authorizing the City Manager to Execute the First Amendment to the Agreement for Services with Cinquini and Passarino, Inc. for Enhanced Infrastructure Financing District Legal Map and Description Services and Allocating Funds

The Enhanced Infrastructure Financing District (EIFD) formation process requires the creation of a legal map and description of the parcels that will comprise the district. In January 2025, the City entered into an agreement with Cinquini and Passarino, Inc. ("Consultant") to provide these services (the "Agreement"). The Consultant has completed these services and delivered a complete set of signed documents, which will be used for filing the approved district with the State Board of Equalization (BOE). Due to unforeseen additional research required to prepare the documents, an amendment to the Agreement to increase the total compensation by $16,954 (the "First Amendment") is proposed.

Page 4 of 178 ends

15. Adoption of a City Council Resolution Accepting Project 2227 – Traffic Signal Improvements as Complete and Authorizing the City Engineer to File a Notice of Completion

Project 2227 – Traffic Signal Improvement (Project) upgraded traffic signal hardware at 35 signalized intersections throughout the City. This resolution will accept the project as complete and authorize the City Engineer to file a Notice of Completion.

16. Adoption of a City Council Resolution Authorizing the City Manager to Accept a Community Grant from the United States Environmental Protection Agency and Enter into a Grant Agreement

The City was selected for a $959,752 federal earmark through the House Appropriations Committee and is eligible for receipt of grant funds through the administering party, the United States Environmental Protection Agency (US EPA) under the Safe Drinking Water State Revolving Fund Community Grants Program. The grant-funded project will identify and install alternative power technology to supplement the energy consumption of the City’s Water Treatment Plant (WTP) with off-grid, less expensive energy.

17. Adoption of a City Council Resolution Accepting Project 2028 – Crestview Drive Safety Improvements as Complete and Authorizing the City Engineer to File a Notice of Completion

Project 2028 – Crestview Drive Safety Improvements (Project) installed pavement markings, raised medians, and pedestrian crossings at six intersections throughout the City. This resolution will accept the construction contract as complete and authorize the City Engineer to file a Notice of Completion.

18. Adoption of a City Council Resolution Approving Expenditures for City Representatives’ Travel to China

The City received an invitation from The Chinese People’s Association for Friendship with Foreign Countries (the “Conference Host”), inviting City representatives to travel to Hangzhou, China, to attend the 7th China-US Sister Cities Conference from October 25 through October 27, 2025.

COUNCIL REQUEST FOR FUTURE AGENDA ITEMS
Council Members may request items to be considered for future agendas. An item will only be brought forward with a majority vote and will appear on a future agenda with staff recommendations for further Council consideration.

COUNCIL MEMBER REMARKS
Council Members may make brief announcements or informal comments at this time. (No Action Required)

ADJOURNMENT TO OCTOBER 20, 2025

Page 5 of 178 ends

NOTICE TO PUBLIC

GENERAL INFORMATION
Copies of the open session agenda packets, as distributed to the City Council, are on file in the office of the City Clerk, 65 Civic Avenue, Pittsburg, California, and are available for public inspection, beginning 72 hours in advance, during normal business hours (8:00 a.m. – 5:00 p.m., Monday through Friday, except City holidays). Full agenda packets are also located on the City’s website at www.pittsburgca.gov. If any reports or documents, which are public records, are distributed to the City Council less than 72 hours before the meeting, those reports or documents will be available for public inspection in the City Clerk’s Office and on the day of the meeting in the Council Chamber at the public counter area below the dais.

SPEAKER’S CARD
Members of the audience who wish to address the City Council on issues that are not scheduled for the agenda and on any items listed as part of the agenda should complete a Speaker’s Card available at the dais. Please read the card carefully in order to fill out the card properly. Submit the completed card to the City Clerk before the item is called, preferably before the meeting begins. Individuals will be given up to three minutes to address the Council unless additional time is allowed as provided for spokespersons. Speakers are not permitted to yield their time to another speaker. Prior to speaking, each member of the public shall state their name and business and City of residence in a clear and audible tone of voice. Pursuant to the Brown Act, no action may be taken by the City Council on items not already scheduled on the agenda; however, the City Council may refer your comments/concerns to staff or request that the item be placed on a future agenda.

PUBLIC HEARINGS
Persons who wish to speak on Public Hearings listed on the agenda will be heard when the Public Hearing is opened, except on Public Hearing items previously heard and closed to public comment. After the public has commented, the item is closed to public comment and brought to the Council/Agency level for discussion and action.

Further comment from the audience will not be received unless requested by the Council/Agency.

There is a 90-day limit for the filing of a challenge in the Superior Court to certain City administrative decisions and orders which require a hearing by law, the receipt of evidence, and the exercise of discretion. The 90-day limit begins on the date the decision is final (Code of Civil Procedure Section 1094.6). Further, if you challenge an action taken by the City Council in court, you may be limited, by California law, including but not limited to Government Code Section 65009, to raising only those issues you or someone else raised in the public hearing, or in written correspondence delivered to the City Council prior to or at the public hearing. The City Council may be requested to reconsider a decision if the request is made prior to the next City Council meeting, regardless of whether it is a regular or special meeting.

NOTICE TO THE DISABLED AND VISUALLY OR HEARING IMPAIRED In compliance with the Americans with Disabilities Act, the City of Pittsburg will provide special assistance for disabled residents. Upon request, an agenda for any meeting shall be made available in appropriate alternative formats. The Council Chamber is equipped with sound amplifier units for use by the hearing impaired. The units operate in conjunction with the Chamber’s sound system. You may request the sound amplifier from the City Clerk for personal use during Council meetings. If you need special assistance to participate in this meeting, or are requesting a specially formatted agenda, please contact the City Clerk at (925) 252-4850. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting or provide the requested agenda format. (28 CFR 35.102-35.104 ADA Title II)

DISRUPTIVE CONDUCT
The Council requests that you observe the order and decorum of our Council Chamber by turning off or setting to vibrate all cellular telephones and electronic devices, and that you refrain from making personal, impertinent, or slanderous remarks. Boisterous and disruptive behavior while the Council is in session, and the display of signs in a manner which violates the rights of others or prevents others from watching or fully participating in the Council meeting, is a violation of our Municipal Code and any person who engages in such conduct can be ordered to leave the Council Chamber by the Mayor.

LIVE MEDIA BROADCASTING ADVISEMENT
City Council meetings are webcast live on the City’s website at www.pittsburgca.gov on the Agendas and Live Meetings page. Past meetings and approved minutes are also archived on that webpage. Watch the live meeting via the City’s webcast (www.pittsburgca.gov - Agendas and Live Meetings), on Comcast Channel 24 Delta TV, AT&T U- Verse Channel 99 Delta TV. Contact the City Clerk’s office at (925) 252-4850 for more information

Page 6 of 178 ends

City Council Agency/Liaison/Subcommittee Assignments as of July 7, 2025

OUTSIDE AGENCY BOARDS COUNCIL MEMBER(S) TYPE MEETS TIME STAFF ABAG Dionne Adams / Jelani Killings (Alt.) Standing Annual G. Evans Delta Diablo* Jelani Killings / Arlene Kobata (Alt.) Standing 2nd Wednesday 4:30 PM J. Samuelson East Co. Co. County Habitat Conservancy Arlene Kobata / Juan Banales (Alt.) Standing 4th Monday (Bi-Monthly) 2:00 PM J. Davis East County Water Management Juan Banales / Jelani Killings (Alt.) Standing Bi-Annual 1:00 PM J. Samuelson MCE Clean Energy Board Arlene Kobata / Angelica Lopez (Alt.) Standing 3rd Thursday 6:30 PM D. Buchanan TRANSPLAN / ECCRFFA Juan Banales / Dionne Adams (Alt.) Standing 2nd Thursday 6:30 PM J. Samuelson Tri-Delta Transit (2 reps)** Angelica Lopez & Dionne Adams / Jelani Killings (Alt.) Standing 4th Wednesday 4:00 PM J. Samuelson

LIAISON COUNCIL MEMBER(S) TYPE MEETS TIME STAFF
East Bay League of California Cities Jelani Killings / Dionne Adams (Alt.) Standing 3rd Thursday G. Evans Green Empowerment Zone Arlene Kobata / Jelani Killings (Alt.) Standing 3rd Friday (Bi-Monthly) 9:30 AM J. Davis Los Medanos Health Advisory Committee Arlene Kobata & Jelani Killings Ad Hoc As needed M. Aliotti Mayor’s Conference Jelani Killings / Dionne Adams (Alt.) Standing 1st Thursday 6:30 PM G. Evans Pittsburg Police Activities League (PAL) Arlene Kobata & Angelica Lopez / Dionne Adams (Alt.) Standing Monthly S. Albanese School Districts Committee (2x2) Jelani Killings & Angelica Lopez / Juan Banales (Alt.) Standing Quarterly M. Aliotti

SUBCOMMITTEES COUNCIL MEMBER(S) TYPE MEETS TIME STAFF
Community and Economic Development Jelani Killings & Dionne Adams / Angelica Lopez (Alt.) Standing 2nd Wednesday 5:30 PM J. Davis Development Agreement Jelani Killings & Dionne Adams Ad Hoc As needed J. Davis Finance Management Juan Banales & Jelani Killings / Dionne Adams (Alt.) Standing 3rd Friday 5:00 PM P. Rodrigues Infrastructure and Transportation Juan Banales & Dionne Adams / Angelica Lopez (Alt.) Standing 4th Thursday 5:30 PM J. Samuelson Tenant Protections Juan Banales & Angelica Lopez Ad Hoc As needed S. Bellafronte Life Enrichment Dionne Adams & Angelica Lopez / Arlene Kobata (Alt.) Standing 3rd Wednesday 5:30 PM K. Simonton Pittsburg Arts and Community Foundation Angelica Lopez & Jelani Killings Standing As needed K. Simonton Public Safety Arlene Kobata & Angelica Lopez / Jelani Killings (Alt.) Standing 1st Wednesday 5:30 PM S. Albanese *Stipend of $170 per month
** Stipend of 100 per month

Page 7 of 178 ends

NATIONAL ITALIAN-AMERICAN HERITAGE MONTH
October 2025
WHEREAS, the City of Pittsburg celebrates the diversity and history of our City; and WHEREAS, October marks Italian-American Heritage month by recognizing the contributions and achievements of Italian-Americans; and WHEREAS, between 1880 and 1924, nearly four million people left the familiar comfort of Italy to make a new life for themselves and their families in the unknown land of America; and WHEREAS, over 26 million Americans of Italian descent currently reside in the United States, making up America’s seventh largest ethnic group; and WHEREAS, Italian-Americans have indeed worked hard to build upon their rich heritage over the last century, and the fruits of their labor are evident in various aspects of our national life; and
WHEREAS, several generations of Southern Italian and Sicilian-Americans look back on the courage of their ancestors with the heartfelt gratitude and unparalled pride.

NOW, THEREFORE, I, Jelani Killings, on behalf of the City Council of the City of Pittsburg, do hereby proclaim October 2025 as National Italian-American Heritage month in the City of Pittsburg.

____________________________________________________________________________________________________________________________________________________ Alice E. Evenson, City Clerk
____________________________________________________________________________________________________________________________________________________ Jelani Killings, Mayor

Page 8 of 178 ends

NATIONAL BREAST CANCER AWARENESS MONTH
October 2025

WHEREAS, Breast Cancer Awareness month is an international health campaign that is held every October; and
WHEREAS, the month aims to promote screening and prevention of the disease which affects over 2 million women worldwide; and
WHEREAS, known best for its pink theme color, the month features a number of programs conducted by cancer advocacy organizations to local community groups to major retailers; and WHEREAS, October 13 is nationally recognized in the U,S. as Metastatic Breast Cancer Awareness Day and seeks to educate the public on the need for more research and treatments for this deadline disease.

NOW, THEREFORE, I, Jelani Killings, on behalf of the City Council of the City of Pittsburg, do hereby proclaim October 2025 as National Breast Cancer Awareness Month in the City of Pittsburg and encourage the community to be proactive by scheduling screenings that can lead to early detection and preservation.

____________________________________________________________________________________________________________________________________________________ Alice E. Evenson, City Clerk
____________________________________________________________________________________________________________________________________________________ Jelani Killings, Mayor

Page 9 of 178 ends

NATIONAL ARTS AND HUMANITIES MONTH
October 2025

WHEREAS, every October, organizations and communities across the country celebrate National Arts and Humanities Month (NAHM) to recognize the importance of culture in America; and
WHEREAS, NAHM was launched by Americans for the Arts more than 30 years ago as a National Arts week in honor of the twentieth anniversary of the National Endowment for the Arts and National Endowment for the Humanities. In 1993, it was reestablished by Americans for the Arts and National Arts Partners as a month-long celebration; and WHEREAS, the goal is to focus on equitable access to the arts at local, state, and national levels; encourage individuals, organizations, and diverse communities to participate in the arts; allow governments and businesses to show their support of the arts; and to raise public awareness about the positive impact of the arts and humanities in our communities and lives; and WHEREAS, the arts is a national asset and should be available everywhere to everyone and this month encourages everyone to appreciate art and explore the rich cultures around us.

NOW, THEREFORE, I, Jelani Killings, on behalf of the City Council of the City of Pittsburg, do hereby proclaim October 2025 as National Arts and Humanities Month in the City of Pittsburg and call upon our residents to celebrate and get involved by promoting the arts and humanities of our nation.

____________________________________________________________________________________________________________________________________________________ Alice E. Evenson, City Clerk
____________________________________________________________________________________________________________________________________________________ Jelani Killings, Mayor

Page 10 of 178 ends

CALIFORNIA CLEAN AIR DAY
October 1, 2025

WHEREAS, air pollution contributes to higher rates of cancer and heart and lung diseases, which adversely affect health; and
WHEREAS, emissions from vehicles, industry, and even household sources significantly affect the natural environment and air quality; and
WHEREAS, it is vital that we protect the health and well-being of our residents, visitors, and workforce; and
WHEREAS, individual actions such as not idling vehicles, walking or biking to work and school, carpooling, and conserving energy can directly improve air quality in our city; and WHEREAS, everyone can play a role and raise awareness to encourage our residents to develop environmentally healthier habits to improve the air quality in our community.

NOW, THEREFORE, I, Jelani Killings, on behalf of the City Council of the City of Pittsburg, do hereby proclaim October 1, 2025 as California Clean Air Day in the City of Pittsburg and encourage all residents to participate by developing habits that can improve the air quality.

____________________________________________________________________________________________________________________________________________________ Alice E. Evenson, City Clerk
____________________________________________________________________________________________________________________________________________________ Jelani Killings, Mayor

Page 11 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor/Chair and Council/Governing Board Members

FROM: Maria M. Aliotti - Interim City Manager/Executive Director

SUBJECT: Adoption of a City Council Resolution Authorizing the City Manager to Execute the Economic Development Incentive
Agreement with Cielo Supermarket Pittsburg, Inc. for the Highland Square Shopping Center and Adopting the
Economic Development Subsidy Report, Adoption of a
Pittsburg Power Company Resolution Authorizing the
Transfer of Funds to Finance the Economic Development
Incentive Agreement

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

The Highland Square Shopping Center serves as the primary neighborhood commercial center for Pittsburg residents who live along Buchanan Road. The 58,000- square-foot commercial anchor space has been vacant since 2019, and remains vacant due to the COVID-19 Pandemic and economic market factors surrounding big-box retail spaces. In 2024, Cielo Supermarkets ("Cielo") began negotiations to lease approximately 25,000 square feet of the anchor space to open a supermarket and approached the City seeking financial assistance. Staff is proposing an incentive package totaling $120,000. Pursuant to state law, the amount of the incentive in relation to the overall $6.2 million project is low and does not trigger prevailing wages.

FISCAL IMPACT

The proposed incentive totals $120,000: 1) a $77,500 building permit fee credit and a $42,500 sales tax rebate, remitted at 50% of quarterly tax receipts upon issuance of the Certificate of Occupancy. The building permit fee credit would be covered through a transfer of funds from the Pittsburg Power Company ("PPC"); the 50% remittance of

Page 12 of 178 ends

quarterly sales tax receipts ensures the City will collect some revenue. Based upon review of sales tax revenue, it is estimated that the $42,500 sales tax rebate will be paid within two years of the business opening.

RECOMMENDATION

City Council adopt the resolution authorizing the City Manager to execute the Economic Development Incentive Agreement with Cielo Supermarket Pittsburg, Inc. and Adopting the Economic Development Subsidy Report, the Governing Board of the Pittsburg Power Company adopt the attached resolution authorizing the transfer of funds to support the Economic Development Incentive Agreement.

BACKGROUND

The subject tenant space within the Highland Square Shopping Center has been vacant since the closure of Food Source in 2019. This closure came at the inflection point when the COVID pandemic hit and businesses of all shapes and sizes felt its impact.

One of the residual impacts coming out of this has been retail businesses looking to reduce their overhead costs by reducing their location footprint, leaving many large spaces in the region vacant. Other examples include the former K-Mart store in Concord and the former Fry’s Electronics store in Fremont. Property owners of these spaces have recently found success in demising these large spaces into smaller spaces to allow tenants to move into these units with less overhead cost. As such, Cielo is looking to lease approximately 25,000 square feet of the Highland Square Shopping Center to open its second grocery store in the region.

Cielo Supermarket first opened its doors in 2021 at 1818 A Street in Antioch, filling a much-needed void in grocery amenities in that area. With Cielo Pittsburg, the owners seek to transform the long-vacant space into a vibrant, community-centered grocery store providing access to fresh, affordable food, excellent service, and a shopping experience that reflects the diversity and character of Pittsburg. Their goal is not just to operate a store, but to become a trusted neighborhood partner.

The proposed project valuation is currently estimated at approximately $6.2 million, and is likely to open by Summer 2026.

SUBCOMMITTEE FINDINGS

The proposed agreement was presented and discussed at the Community and Economic Development Subcommittee meeting on August 21, 2025. The Subcommittee generally supported the incentive as proposed. However, it was requested that the supermarket be a full-service grocer, that a reasonable opening date be required, and that a term be established for the sales tax rebate.

Page 13 of 178 ends

STAFF ANALYSIS

This proposed incentive package would support the development and operation of the grocery store, while having minimal financial impact to the City, including no out-of- pocket costs. Potential community benefits include the following:
• Adding a grocery store amenity to an existing food desert; • Activating a long vacant space;
• 70 full-time jobs, 20 part-time jobs, and 65 temporary construction jobs; • Increased local access to fresh produce and grocery staples; • Sales tax revenue;
• Increased property tax revenue;
• A committed, family-run business with deep roots in the region; and • Opportunities for community partnerships and local engagement.

The business owners have stated that the proposed incentive package would be of significant benefit to ensuring that the store is fully stocked, functional, and community- ready. Specifically, they will put the financial assistance toward commercial refrigeration, cold storage equipment, tenant improvements, storefront upgrades, and start-up costs such as inventory and initial operation.

ATTACHMENTS:   CC Resolution
PPC Resolution
Agreement
Economic Development Subsidy Report

Report Prepared by: Robert Hicks-Carrera, Economic Development Manager

Page 14 of 178 ends

Resolution No. 25- Page 1 of 2 October 6, 2025

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing the City Manager to Execute an )
Economic Development Incentive Agreement ) RESOLUTION NO. 25- With Cielo Supermarket Pittsburg, Inc. and )
Adopting an Economic Development Subsidy )
Report )

WHEREAS, a grocery store is a vital amenity for the neighborhood surrounding the Highland Square Shopping Center; and

WHEREAS, a grocery store has not operated in the Highland Square Shopping Center since 2019, leaving a significant gap in grocery amenities for the surrounding neighborhood; and

WHEREAS, Seeno Enterprises, owner of the Highland Square Shopping Center, has sought to lease the vacant space to a new grocery store tenant since 2019. During this time, the City partnered with the property owner to conduct marketing and outreach initiatives to bring attention to the space; and

WHEREAS, Cielo Supermarket is seeking to expand by opening a second grocery store, and entered into a lease agreement with the property owner in October 2024 to lease approximately 25,000 square feet of the vacant grocery space with plans to construct tenant improvements to open and operate a grocery store at the Highland Square Shopping Center ("Project"); and

WHEREAS, the project would benefit the City and the surrounding neighborhood by increasing property and sales tax annual revenues and providing a total of approximately 70 full-time jobs, 20 part-time jobs, and 65 temporary construction jobs; and

WHEREAS, in order to facilitate the development of a new grocery store in this area, the City proposes to provide a financial incentive to support the construction and operation of Cielo Supermarket at the Highland Square Shopping Center.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pittsburg hereby authorizes the City Manager to execute the Economic Development Incentive Agreement with Cielo Supermarket Pittsburg, Inc.

BE IT FURTHER RESOLVED that the City Council of the City of Pittsburg hereby adopts the Economic Development Subsidy Report.

Page 15 of 178 ends

Resolution No. 25- Page 2 of 2 October 6, 2025

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor
ATTEST BY:

Alice E. Evenson, City Clerk

Page 16 of 178 ends

Resolution No. 25- Page 1 of 2 October 6, 2025

BEFORE THE GOVERNING BOARD OF THE PITTSBURG POWER COMPANY

OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing the Transfer of $77,500 in )
Pittsburg Power Company Funds to the City of )
Pittsburg to Provide a Permit Fee Waiver as ) RESOLUTION NO. 25- Part of the Economic Development Incentive )
Agreement between the City of Pittsburg and )
Cielo Supermarket Pittsburg, Inc. )

WHEREAS, a grocery store is a vital amenity for the neighborhood surrounding the Highland Square Shopping Center. A grocery store has not operated in the center since Food Source closed in 2019, leaving a significant gap in grocery amenities for the surrounding neighborhood; and

WHEREAS, Seeno Enterprises, property owner sought to lease the vacant space to a new grocery store tenant from 2019 to 2024. During this time, the City partnered with the property owner to conduct marketing and outreach initiatives to bring attention to the space; and

WHEREAS, Cielo Supermarket, owned by Hector and Fabiola Gomez, opened their first location in Antioch in 2020; and

WHEREAS, Cielo Supermarket, seeking to expand by opening a second grocery store, entered into a lease agreement with the property owner in October of 2024 to lease approximately 25,000 square feet of the vacant grocery space with plans to construct tenant improvements to open and operate a grocery store at the Highland Square Shopping Center; and

WHEREAS, the project would result in a supermarket significantly larger than the Cielo's current location in Antioch and a significant expansion of the Cielo Supermarket brand; and

WHEREAS, the project would benefit the area by increasing property and sales tax annual revenue and providing a total of approximately 70 full-time jobs, 20 part-time jobs, and 65 temporary construction jobs; and

WHEREAS, the City of Pittsburg seeks to enter into an Economic Development Incentive Agreement in the form of a permit fee waiver and a sales tax rebate to support this project; and

WHEREAS, the Pittsburg Power Company seeks to invest in this project by utilizing funds towards the permit fee waiver of the Economic Development Incentive Agreement.

Page 17 of 178 ends

Resolution No. 25- Page 2 of 2 October 6, 2025

NOW, THEREFORE, BE IT RESOLVED that the Governing Board of the Pittsburg Power Company hereby authorizes the transfer of $77,500 in Pittsburg Power Company funds to the City of Pittsburg to fund the Permit Fee Waiver as part of the Economic Development Incentive Agreement between the City of Pittsburg and Cielo Supermarket Pittsburg, Incorporated.

PASSED AND ADOPTED by the Governing Board of the Pittsburg Power Company at a regular meeting on the 6th day of October 2025 by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

___________________
Jelani Killings, Chair
ATTEST:

___________________________________
Maria M. Aliotti, Interim Executive Secretary

Page 18 of 178 ends

4902-7779-4910 v4

ECONOMIC DEVELOPMENT INCENTIVE AGREEMENT

BETWEEN THE CITY OF PITTSBURG AND CIELO
SUPERMARKET PITTSBURG INC.

This Economic Development Incentive Agreement (“Agreement”) is made by and between the City of Pittsburg, a California municipal corporation (“City”) and Cielo Supermarket Pittsburg Inc., a California General Stock Corporation (“Business”), effective as of __________________, 2025 (“Effective Date”). City and Business are each hereinafter individually referred to as a “Party” and collectively as the “Parties”.

RECITALS
A. The property located at 1375 Buchanan Road, Pittsburg, CA 94565 (the “Property”) is improved with the Highland Square Shopping Center (“Center”). The 50,181 square foot anchor space (“Space”) located on the Center is designed for and was previously occupied by a grocery store.

B. A grocery store is a vital amenity for the neighborhood surrounding the Property. A grocery store has not operated in the Space since Food Source closed in 2019, leaving a significant gap in grocery amenities for the surrounding neighborhood.

C. Seeno Enterprises, LLC, a California limited liability company (“Property Owner”) sought to lease the Space to a new grocery store tenant from 2019 to 2024.

During this time, the City and a representative of the Property Owner partnered to conduct marketing and outreach initiatives to bring attention to the space.

D. The Business, owned by Hector and Fabiola Gomez, operates a grocery store called “Cielo Supermarket.” The first Cielo Supermarket opened in Antioch in 2020.

E. The Business is seeking to expand by opening its second grocery store and believes the Space is an ideal location for its second grocery store.

F. The Business entered into a lease agreement with the Property Owner in October of 2024 to lease approximately 25,000 square feet of the Space (“Premises”), with plans to construct tenant improvements to prepare the Premises for use as the Business’s second store and to open and operate a grocery store in the Premises (“Project”). The Project would result in a supermarket significantly larger than the Business’s current location in Antioch and a significant expansion of the Cielo Supermarket brand.

G. The Project would benefit the City and the surrounding neighborhood by increasing property and sales tax annual revenue and providing a total of approximately 70 full-time jobs, 20 part-time jobs, and 65 temporary construction jobs.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 19 of 178 ends

4902-7779-4910 v4
H. In order to facilitate the development of a new grocery store in this area, the City wishes to provide a financial incentive to support the construction and operation of Business’s new supermarket at the Property. The financial incentive will include a waiver of certain permit fees and a rebate of a portion of the sales taxes the Business will pay.

NOW, THEREFORE, for good and valuable consideration, the Parties agree to the following:

Section 1. Incorporation of Recitals.

The above Recitals are incorporated herein as if fully set forth in the body of this Agreement.

Section 2. Definitions.
“Affiliate” means an entity over which the Business has Control. “Agreement” is defined in the preamble.
“Assignment” is defined in Section 12.
“Business” is defined in the preamble.
“Business’s Share” means fifty percent (50%) of the Sales Taxes. “Casualty” means the Premises are damaged or destroyed by any earthquake, flood, fire, hurricane, tornado, war, insurrection, act of the public enemy, act of God, riot, or vandalism.
“CDTFA” means the California Department of Tax and Fee Administration. “Center” is defined in Recital A.
“City” is defined in the preamble.
“City Rebate Payment” is defined in Section 7.2(c).
"City Tax Determination” is defined in Section 7.2(a).
“Claims” means any and all manner of liabilities, claims, actions, causes of action, suits, proceedings, demands, damages, fines, penalties, obligations, orders, judgments, liens, costs, expenses, including attorneys’ fees, costs, and disbursements.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 20 of 178 ends

4902-7779-4910 v4
“Close” means the Project has been Open for a period of time and thereafter ceases to be Open, except for purposes of performing repairs or reconstruction following a Casualty.
“Control” means any of the following (a) the Business has direct or indirect management or control of the managing member or members of the entity if the entity is a limited liability company; (b) the Business has direct or indirect management or control of the managing general partner or general partners if the entity is a partnership, and (c) if the entity is a corporation (i) the Business and the entity have boards of directors that overlap by more than fifty percent (50%) of their directors, or (ii) the Business has direct or indirect control of a majority of the shareholders.
“Default” is defined in Section 10.1.
“Effective Date” is defined in the preamble.
“Law(s)” means any and all applicable laws, ordinances, statutes, codes, rules, regulations, orders and decrees, of the United States, the State of California, the County, City, or any other political subdivision in which the Property is located, and of any other political subdivision, agency or instrumentality exercising jurisdiction over City, Business, this Agreement, or the Property, including the California Environmental Quality Act, California Public Resources Code sections 21000 et. seq. (“CEQA”), CEQA guidelines, and implementing regulations (all as amended from time to time); labor laws and standards (including Prevailing Wage Laws); Public Contracts Code requirements; the Municipal Code (including zoning and development standards; the Uniform Building Code (with City modifications) and other building, plumbing, mechanical and electrical codes; disabled and handicapped access requirements (including the Americans With Disabilities Act, 42 U.S.C. section 12101, et seq., Government Code section 4450, et seq., Government Code section 11135, et seq., and the Unruh Civil Rights Act, Civil Code section 51, et seq.); and all provisions consolidating, amending, replacing, succeeding or supplementing any of the foregoing.
“Material Default” is defined in Section 10.2.
“Open” means the Project is open for business to the public as an adequately staffed, fully furnished, fully fixtured, adequately stocked grocery store with inventory and supplied with water, gas, and electricity.
“Opening Date” is defined in Section 10.2(a).
“Outside Agency” means any governmental authority having jurisdiction over the Business, the Project, or the Property.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 21 of 178 ends

4902-7779-4910 v4
“Party” and “Parties” are defined in the preamble.
“Period” means a calendar year quarter.
“Permit” means any permit the Business must obtain from the City’s Building Division or the City’s Public Works- Engineering Division for the Project. “Permit Fee Waiver” is defined in Section 7.1.
“Permit Fee Waiver Cap” is defined in Section 4.
“Permit Fee Waiver Condition(s)” is defined in Section 6.2. “Permit Fee Waiver Term” is defined in Section 5.1.
“Premises” is defined in Recital F.
“Project” is defined in Recital F.
“Property” is defined in Recital A.
“Property Owner” is defined in Recital C.
“Sales Tax Law” means the Bradley-Burns Uniform Local Sales and Use Tax Law (California Revenue and Taxation Code section 7200, et seq.). If the Bradley- Burns Uniform Local Sales and Use Tax Law is further amended, terminated or rescinded, and Sales Taxes are calculated in an alternate manner or are replaced by an alternate revenue stream (i) arising from the retail sale, use or other consumption of tangible personal property from or in the Space, or (ii) designated as being a replacement for Sales Taxes previously generated by the retail sale, use or other consumption of tangible personal property on or from the Space, then “Sales Taxes” shall also mean those revenues attributable to sales, services or consumption of tangible personal property in, on or from the Space, collected for City in the alternate manner of calculation, so long as City receives its portion of such revenues and has the legal right under California and/or federal Law to retain and control the disposition of all of its portion thereof.
“Sales Tax Rebate” is defined in Section 4.
“Sales Tax Rebate Cap” is defined in Section 4.
“Sales Tax Rebate Condition(s)” is defined in Section 6.1. “Sales Tax Rebate Term” is defined in Section 5.2.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 22 of 178 ends

4902-7779-4910 v4
“Sales Taxes” means for each 3-month Period during the Term, that portion of taxes actually received by City from the imposition of Sales Tax Law attributable to the sales, services or business activities of the Business within the Space to the extent allocated and paid by the State Board of Equalization to City for its use, in a particular 3- month Period. The defined term “Sales Taxes” shall not include any of the following:
(i) any sales tax levied by, collected for or allocated to the State of California, the County, or any district or entity (including an allocation to a statewide or Countywide pool) other than City; (ii) any administrative fee charged by the State Board of Equalization or the County; (iii) any portion of sales tax subject to any sharing, rebate, offset or other charge imposed pursuant to any applicable Law; (iv) any sales tax (or other funds measured as sales tax) required by the State of California to be paid over to another public entity (including the State) or set aside and/or pledged to a specific use other than for deposit into City’s general fund; and (v) any sales taxes which City cannot pay to the Business consistent with the requirements of Government Code Section 53084 and 53084.5. No Sales Taxes shall be considered to have been received by City until City is able to confirm City’s actual receipt thereof from the State Board of Equalization.
“Space” is defined in Recital A.
“Waiver Request” is defined in Section 7.1.

Section 3. Business Representations. The Business represents, warrants and covenants to City as follows:
(a) Authority and Organization. The Business is a California corporation duly organized within and in good standing under the Laws of the State of California and qualified to do business in California. The copies of the documents evidencing the organization of the Business that have been delivered to City are true and complete copies of the originals, as amended to the Effective Date. The Business has full right, power and lawful authority to undertake all of its obligations as provided herein, the execution, performance and delivery of this Agreement by the Business has been fully authorized by all requisite actions on the part of the Business, each and all of the persons signing on behalf of the Business are authorized to do so, and such execution is binding upon the Business.
(b) No Conflict. To the best of the Business’s knowledge, the Business’s execution, delivery and performance of its obligations under this Agreement will not constitute a default or a breach under any contract, agreement or order to which the Business is a party or by which it is bound.
(c) No Bankruptcy. The Business is not the subject of a bankruptcy proceeding or in the process of filing for any bankruptcy protection.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 23 of 178 ends

4902-7779-4910 v4
(d) No Litigation. There are no Claims, causes of action or other litigation or proceedings pending or threatened against the Business that would affect the Business’s ability to undertake and satisfy all of its obligations pursuant to this Agreement.
(e) Truth of Representations and Warranties. The Business shall, upon learning of any material fact or condition which would cause any of the warranties and representations in this Section 3 not to be true, immediately give written notice of such fact or condition to City.

Section 4. Incentive Package. Subject to satisfaction of the terms and conditions herein, the Business will be eligible to receive a financial incentive package with a maximum total value of One-Hundred and Twenty Thousand Dollars ($120,000). The financial incentive package will include (1) waiver of any City fee the City would ordinarily require for issuance of any Permit during the Permit Fee Waiver Term defined in Section 5.1 (“Permit Fee Waiver”), up to a maximum amount of Seventy-Seven Thousand, Five Hundred Dollars ($77,500) (“Permit Fee Waiver Cap”); and (2) a rebate of the Business’s Share of Sales Taxes during the Sales Tax Term defined in Section 7.2 (“Sales Tax Rebate”), up to a maximum total of Forty-Two Thousand Five Hundred Dollars ($42,500) (“Sales Tax Rebate Cap”).

4.1 Business’s Project Costs. Except as otherwise expressly provided herein, all costs of site preparation, planning, designing, permitting, and constructing the Project shall be borne solely by the Business. The Permit Fee Waiver shall not include fees that the Business pays directly to or that City collects on behalf of an Outside Agency.

4.2 No Cash Value. The Business shall have no right to receive a cash payment for the difference between the amount of Permit fees the City actually waives and the Permit Fee Waiver Cap, or the difference between the total amount of Sales Taxes the City rebates to the Business during the Sales Tax Term and the Sales Tax Rebate Cap.

Section 5. Term:

5.1 Permit Fee Waiver Term. The “Permit Fee Waiver Term” means the period commencing on the Effective Date and expiring on the earlier of the date that the City has approved Waiver Requests evidencing that the Business has incurred Permit fees that equal or exceed the Permit Fee Waiver Cap and December 31, 2029.

5.2 Sales Tax Rebate Term. The “Sales Tax Rebate Term” means the period commencing on the date the Business receives its Certificate of Occupancy and expiring on the earlier of (a) the date that all City Tax Determinations equal or exceed the Sales Tax Rebate Cap and the period in Section 7.2(b) has expired without the Business requesting an audit or any audit requested pursuant to Section 7.2(e) has been completed, and (b) December 31, 2029.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 24 of 178 ends

4902-7779-4910 v4
Section 6. Conditions Precedent.

6.1 Conditions Applicable to Sales Tax Rebate. The conditions listed in this Section 6.1 are conditions precedent to any City Tax Determination or City Rebate Payment (each, a “Sales Tax Rebate Condition” and collectively the “Sales Tax Rebate Conditions”).
(a) Seller’s Permit. The Business shall have obtained a seller’s permit.
(b) Filing of Returns; Payments. The Business shall have filed all required returns with the CDTFA for the applicable Period and provided City with copies thereof. The Business shall have paid any amounts that the Business owes under the Sales Tax Law for the applicable Period.
(c) Certificate of Occupancy. The Business shall have received a Certificate of Occupancy from the City for the Project. (d) Open. The Business shall Open in the Space.
(e) City Receipt of Documentation. The City shall have received all of the items listed in Section 7.2(a).
(f) No Default. At the time of the City Tax Determination or due date for the City Rebate Payment, the Business shall not be in Default and no Material Default shall have occurred.

6.2 Conditions Applicable to Permit Fee Waiver. The conditions listed in this Section 6.2 are conditions precedent to any Permit Fee Waiver (each, a “Permit Fee Waiver Condition” and collectively the “Permit Fee Waiver Conditions”). (a) Permit Ready to Issue. City shall have received a complete application for any Permit and be ready to issue such Permit subject only to the payment of any applicable fees.
(b) Receipt of Waiver Request. City shall have received a Waiver Request.
(c) No Default. At any time between City’s receipt of a Waiver Request and the due date for City’s approval or disapproval of the Waiver Request, the Business shall not be in Default and no Material Default shall have occurred.

Section 7. Processing of Incentives.

7.1 Permit Fee Waiver: After the Business submits a complete application for each Permit (other than payment of fees), the Business will deliver to City a written request to waive the City’s fees for the Permit together with the invoice(s) evidencing the amount of the fees the City would otherwise charge for the Permit Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 25 of 178 ends

4902-7779-4910 v4
(collectively, the “Waiver Request”). Within ten (10) business days after receipt and review of the Waiver Request, the City shall determine whether Permit Fee Waiver Conditions have been satisfied and deliver the Business written notice of City’s approval or disapproval of the Waiver Request and, if the notice states the City’s approval of the Waiver Request, the amount of fees that are waived. Any disapproval shall state in writing the reasons for disapproval. The Business may submit Waiver Requests until the Permit Fee Waiver Cap is reached or until the Permit Fee Waiver Term expires. If a Waiver Request is timely submitted, the Permit Fee Waiver Cap has not been reached, and the Permit Fee Waiver Conditions have been satisfied, City’s obligation to approve a Waiver Request shall survive the expiration of the Permit Fee Waiver Term.

7.2 Sales Tax Rebate: The City shall determine the Business’s Share and, subject to satisfaction of the Sales Tax Rebate Conditions, make payment to the Business as provided in this Section 7.2.
(a) City Tax Determination. The City Manager or their designee shall provide the Business with a statement of the aggregate Sales Taxes received by the City during the preceding Period and City’s determination of the Business’s Share for such preceding Period (herein referred to as the “City Tax Determination”) within forty-five (45) days after City has received all of the following: (i) from the State of California, the Sales Taxes generated from the Project for the Period; (ii) from the CDTFA, the payment data to verify receipt of such Sales Taxes; (iii) from the Business, all returns the Business is required to file for the Period under the Sales Tax Law and evidence that the Business has remitted to CDTFA all amounts required under the Sales Tax Law for that Period.
(b) Business Review of City Tax Determination. The Business shall review and approve or disapprove City Tax Determination within forty-five (45) days of receipt of the City Tax Determination. The Business’s failure to send written notice of disapproval within such 45-day period shall be deemed Business’s approval of the City Tax Determination. Any disapproval shall state in writing the reasons for disapproval and the Business’s requested changes and shall provide any additional information or documentation available to the Business to support Business’s requested changes. City, promptly following receipt of a notice of disapproval by Business and the additional supporting information shall review all information provided by the Business and either re-determine the City Tax Determination for the Period or provide the Business with a statement of disagreement with respect to the Sales Taxes for the applicable Period and Business’s Share. Any disagreement between the City and the Business with respect to the City Tax Determination shall be resolved pursuant to an audit conducted by the Business pursuant to subsection (e) below. (c) City Rebate Payment. Within thirty (30) days after the Business approves the City Tax Determination, City shall pay the Business the Business’s Share of the Sales Taxes (each, a “City Rebate Payment”). City anticipates that each City Rebate Payment can be made within one hundred twenty (120) to one hundred fifty (150) days after the end of each Period.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 26 of 178 ends

4902-7779-4910 v4
(d) Proration. City’s obligation to make the City Rebate Payments shall automatically terminate upon expiration of the Sales Tax Rebate Term or other termination of this Agreement, provided however, if the Sales Tax Rebate Term expires before the City is required to make payment of a City Rebate Payment for a Period during which this Agreement was in full force and effect for the Period or portion thereof, the City shall pay Business the Business’s Share of Sales Taxes or prorated portion thereof for the Period that this Agreement was in effect. (e) Audit. The Business may, by written notice to City, request an independent audit of City’s Sales Taxes records and reports. The independent audit of the books and records shall be conducted by a CPA reasonably acceptable to both Business and City, who shall be compensated on a fee for service rather than on a contingency fee basis. If, within thirty (30) days after City’s receipt of Business’s notice requesting an audit, Business and City are unable to agree on the CPA to conduct such audit, then Business may designate a nationally recognized accounting firm not then employed by Business or City to conduct such audit. The audit shall be limited to the determination of the amount of Sales Taxes for the applicable Period. Any audit shall be conducted in accordance with standards to ensure that any City information regarding sales and use tax remains confidential as required by Law. In the event the audit determines the City Rebate Payment was less than the Business’s Share, the City shall within thirty (30) days of the completion of such audit make a payment to the Business of the amount of any underpayment. In the event the audit determines that the City Rebate Payment exceeded the Business’s Share, the amount of any overpayment shall offset future City Rebate Payments until the overpayment has been corrected and, if no further City Rebate Payments are due, then Business shall refund the amount of the overpayment to City within 10 days following City’s demand. The Business shall pay all costs and expenses of the audit.

Section 8. Compliance with Laws.

The Business, at its expense, shall obtain all permits, inspections, authorizations, licenses, and entitlements required under applicable Law. In addition, the Business, at its expense, shall construct, operate, and manage the Project in conformity with all applicable Laws. In exchange for City’s financial commitments under this Agreement, the Business hereby waives and releases all rights or Claims that the Business has or may have in the future against City or the Indemnitees under applicable Laws as a result of, arising out of, or connected with the Business’s development or operation of, or City’s financial contributions to, the Project, including but not limited to any Claims under applicable Labor Code Provisions including Labor Code section 1720 et seq. The Business further covenants and agrees that it will not bring, commence, maintain or prosecute, directly or indirectly, any action at law or proceeding in equity or any legal administrative proceeding or any claim for damages or any other relief against City or any Indemnitees, based in whole or in part on any actual or alleged failure to comply with Laws. The waiver and release set forth in this Section 8 may, and shall be plead, as a full and complete defense to, and may be used as a basis for an injunction against any action, suit or proceeding which may be instituted, prosecuted, or maintained in breach of the covenants contained in this Section 8.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 27 of 178 ends

4902-7779-4910 v4
The Business is aware of and familiar with the provisions of Section 1542 of the California Civil Code which provides as follows:
"A general release does not extend to claims which the creditor or releasing party does not know or suspect to exist in his favor at the time of executing the release, and that, if known by him or her, would have materially affected his or her settlement with the debtor or released party."
As such relates to this Section 8, the Business hereby waives and relinquishes all rights and benefits which it may have under Section 1542 of the California Civil Code.

Business’s Initials: ___________
The Business shall defend ( with counsel reasonably acceptable to City), indemnify, assume all responsibility for, and hold harmless City and its elected and appointed representatives, officers, employees, agents and volunteers, from and against, any and all Claims, arising directly or indirectly from approval or implementation of this Agreement or construction or operation of the Project, including the Business’s actual or alleged failure to comply with applicable Laws as required above, including any and all Claims made by contractors, subcontractors or other third party claimants pursuant to Labor Code Sections 1726 and 1781, whether such Claims shall accrue or be discovered before or after expiration or termination of this Agreement. The Business’s obligations under this Section 8 shall survive termination or expiration of this Agreement.

Section 9. Insurance.

The Business shall at all times maintain those insurance policies specified in Exhibit A and shall comply with the requirements set forth in Exhibit A. Within ten (10) business days after the Effective Date, Business shall provide the documentation described in Exhibit A, section C.5.

Section 10. Default and Remedies.

10.1 Default. Each of the events listed below shall constitute a “Default” under this Agreement.
(a) The Business’s failure to pay all necessary permitting fees associated with the Project, whether such fees are outside the purview of the Permit Fee Waiver or any fee for any Permit above the Permit Fee Waiver Cap, within ten (10) days after receipt of written notice from City.
(b) The Business’s failure to comply with all Laws which failure is not cured within ten (10) days after receipt of written notice from City.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 28 of 178 ends

4902-7779-4910 v4
(c) The Business’s failure to perform fully any of its other promises, covenants, or agreements under this Agreement as and when due and such failure is not cured within ten (10) days after receipt of written notice from City. (d) The City’s failure to make any payment required under this Agreement within ten (10) days after receipt of written notice from the Business.

10.2 Material Default. Any of the following shall be an uncurable, material default by Business (“Material Default”):
(a) Opening to the Public: The Business’s failure to complete construction of the Project and receive its Certificate of Occupancy, and Open in the Premises within two (2) years after the Effective Date (“Opening Date”). The City Manager may, in their sole discretion, extend the Opening Date one time for no more than ninety (90) days.
(b) Closure. The Project Closes within forty-eight (48) months after the Project Opens.
(c) Business’s Representations and Warranties. The fact that any of the Business’s representations were untrue on the Effective Date, or the Business’s failure to comply with Section 3(e).
(d) Repeated Failure to Comply with Laws. The Business’s failure to comply with the same Law on two (2) or more occasions in a calendar year, or three (3) or more occasions during the Sales Tax Rebate Term or the Permit Fee Waiver Term.
(e) Assignment Without Consent. Any attempted Assignment without City’s prior written consent.

10.3 Remedies
(a) City Remedies Generally. If a Default occurs under this Agreement, then City may exercise any right or remedy which it has under this Agreement, or which is otherwise available at law or in equity or by statute, and all of City’s rights and remedies shall be cumulative.
(b) City Cessation of Payments and Permit Fee Waiver. Upon the occurrence of a Default by the Business, and without further notice or demand, City may, at its option, cease making City Tax Determinations, disbursing City Rebate Payments, and approving any Waiver Requests.
(c) Repayment to City.

In the case of a Material Default described in Section 10.2, the City may seek payment of any Permit fees that were previously waived. In the case of a Material Default described in Section 10.2 (b), (c), (d), or (e) the City may seek payment of any Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 29 of 178 ends

4902-7779-4910 v4
Permit fees that were previously waived and repayment of any City Tax Determination previously paid to the Business. The City shall deliver the Business notice of City’s election of this remedy and the Business shall, within ten (10) days after the Business’s receipt of notice, submit to City payment of any Permit fees previously waived and repayment of any City Rebate Payments previously received. If the Developer does not timely remit payment to City, City shall be entitled to a pursue any remedy available at law or in equity including recovery of actual damages.
(d) Termination of Agreement. In the case of a Material Default by Business, the City may terminate this Agreement immediately upon written notice to the Business.
(e) Remedy Against City. If the Sales Tax Rebate Conditions have been satisfied, the City is in Default following notice and expiration of the cure period set forth in Section 10.1(d), the Business may enforce its right to receive a City Tax Determination or City Rebate Payment by specific performance. If the Permit Fee Waiver Conditions have been satisfied, the City is in Default, and the cure period set forth in Section 10.1(d) or 10.1(e) has expired, the Business may enforce its right to receive a Permit Fee Waiver by specific performance.
(f) Limitation on Damages. Neither Party shall be entitled to any consequential, special or punitive damages.
(g) No Waiver. Any failure or delay by either Party in asserting any of its rights and remedies as to any Default shall not operate as a waiver of any Default or of any such rights or remedies, or deprive either such Party of its right to institute and maintain any actions or proceedings which it may deem necessary to protect, assert or enforce any such rights or remedies.

Section 11. Indemnification.

Business shall indemnify, defend and hold harmless City and its elected and appointed representatives, officers, employees, agents and volunteers, from and against any and all third-party Claims arising out of or resulting from the construction of the Project or performance or implementation of this Agreement, whether caused in whole or in part by any negligent or intentional act or any omission of Business, its officers, managers, members, agents, employees, subcontractors, volunteers or anyone directly or indirectly acting on behalf of Business, regardless of whether caused in whole or in part by an indemnified party, except to the extent such Claim is caused by the sole or gross negligence or willful misconduct of City.

Section 12. Assignments.

12.1 City Approval of an Assignment. Except as otherwise provided in this Section 12, neither this Agreement nor the Business’s rights hereunder shall be Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 30 of 178 ends

4902-7779-4910 v4
assigned or transferred (each, an “Assignment”), without the prior written consent of City in its sole discretion. Consent to one Assignment shall not be deemed consent to any subsequent Assignment.
(a) Change of Control; Asset Sale. An Assignment requiring City consent shall include (i) a sale of all of the Business’s assets to a third party, and (ii) the collective issuance, sale or transfer of 30% or greater of the Business’s equity interests to third parties.
(b) Assignment to an Affiliate. An assignment or transfer of this Agreement to an Affiliate of Business shall not require the consent of the City, but shall be subject to subsections (c) and (d) below.
(c) Notice to City. At least thirty (30) days prior to the date the Business desires any Assignment to be effective, the Business shall give City written notice, setting forth the name, address and business of the proposed assignee and such other information as City may reasonably request.
(d) Assumption of Obligations. Any assignee pursuant to an Assignment consented to by City and any Affiliate assignee shall deliver to City, before the Assignment shall be effective, a written original of the assignment of this Agreement and the assignee’s agreement to be bound by, assume and perform and observe all terms, covenants and obligations of the Business hereunder, which instrument must be in a form reasonably acceptable to the City Attorney.

12.2 Notice of Change in Organization. The Business shall notify City of any changes in organization, or any other business actions requiring notification to the California State Board of Equalization, California Secretary of State, the County Recorder’s Office, California Franchise Tax Board, the County Assessor, or any other state or local entity required to be notified of any change in business organization or action, even if the foregoing does not constitute an Assignment, within ten (10) days following the date of such change.

Section 13. Notices.

Any approval, disapproval, demand, document or other notice to be provided under this Agreement shall be given in writing and shall be sent (i) for personal delivery by a delivery service that provides a record of the date of delivery, the individual to whom delivery was made, and the address where delivery was made; (ii) by first-class United States mail, postage prepaid, return receipt requested; or (iii) by a nationally recognized overnight courier service, marked for next day business delivery. All notices shall be addressed to the Party to whom such notice is to be given at the address stated in this Section 13 or to such other address as a Party may designate upon ten (10) days prior written notice to the other; notices sent by a Party’s attorney on behalf of such Party shall be deemed delivered by such Party.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 31 of 178 ends

4902-7779-4910 v4
For the avoidance of doubt, telephone numbers are supplied below only for the purpose of accommodating a courier’s or delivery service’s request for a telephone number for the party receiving notice
If to City: City of Pittsburg
65 Civic Avenue
Pittsburg, CA 94565
Attn: Economic Development Manager
Telephone: (925) 252-4279

With copy(ies) to: City of Pittsburg
65 Civic Avenue
Pittsburg, CA 94565
Attn: City Attorney
Telephone: (925) 252-4850

City of Pittsburg
65 Civic Avenue
Pittsburg, CA 94565
Attn: City Manager
Telephone: (925) 252-4850

If to Business: Cielo Supermarket Pittsburg Inc.
1231 Thompson Road
Napa, CA 94558
Attn: Fabiola Gomez
Telephone: (925) 383-2165

All notices shall be deemed effective on the earliest of (a) actual receipt; (b) rejection of delivery; (c) if sent by first class mail, the third day on which regular United States mail delivery service is provided after the day of mailing; or (d) if sent by overnight delivery service, on the next day on which such service makes next-business-day deliveries after the day of sending.

Section 14. Approvals on Behalf of the City
Whenever this Agreement references an action or approval to be undertaken by City, including any action by the City Manager, the City Manager or his or her designee is authorized to act on behalf of City unless specifically provided otherwise or the context should require otherwise.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 32 of 178 ends

4902-7779-4910 v4
Section 15. Construction of Agreement.

The captions preceding the sections of this Agreement have been inserted for convenience of reference only and such captions shall in no way define or limit the scope or intent of any provision of this Agreement. This Agreement has been negotiated at arm’s length and between persons sophisticated and knowledgeable in the matters dealt with herein and shall be interpreted to achieve the intents and purposes of the Parties, without any presumption against the Party responsible for drafting any part of this Agreement. Except where explicit reference is made to business days, provisions in this Agreement relating to number of days shall be calendar days. Any time period to be computed pursuant to this Agreement shall be computed by excluding the first day and including the last day. If the last day falls on a Saturday, Sunday or holiday, the last day shall be extended until the next business day.

Use of the word “including” means “including, without limitation.” As used in this Agreement, masculine, feminine or neuter gender and the singular or plural number shall each be deemed to include the others where and when the context so dictates.

Section 16. Relationship of the Parties; No Third Party Beneficiaries.

The Parties entering into this Agreement do not intend to create any agency, partnership, joint venture, trust, or other relationship with duties or incidents different from those of parties to an arm’s-length contract. There are no third-party beneficiaries to this Agreement.

Section 17. Governing Law.

This Agreement shall be construed in accordance with and governed by the laws of the State of California, without regard to conflict of laws principles. Any actions brought to enforce any provisions of this Agreement shall be brought in Contra Costa County.

Section 18. Time Is of the Essence.

Time is of the essence with respect to all obligations of Business and City under this Agreement.

Section 19. Severability.

If any provision of this Agreement shall be held to be invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining portions shall not in any way be affected or impaired.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 33 of 178 ends

4902-7779-4910 v4
Section 20. Entire Agreement.

This Agreement constitutes the entire understanding of the Parties regarding the subject matter and all prior or contemporaneous oral agreements, understandings, representations and statements, and all prior written agreements, understandings, representations, and statements are superseded by this Agreement.

Section 21. Modifications.

Any alteration, change or modification of or to this Agreement, in order to become effective, shall be made in writing and in each instance signed on behalf of each Party.

Section 22. Counterparts; Electronic Signatures.

This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but all of which taken together shall constitute one and the same instrument.
[Signatures on next page]

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 34 of 178 ends

4902-7779-4910 v4
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date and year first written above.

BUSINESS:

______________________

Hector Gomez
President/Owner

CITY OF PITTSBURG:

______________________

Maria M. Aliotti
Interim City Manager

APPROVED AS TO FORM:

______________________

Donna Mooney
City Attorney
Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 35 of 178 ends

4902-7779-4910 v4

EXHIBIT A
Insurance Requirements
Business, at its own cost and expense, shall procure the types and amounts of insurance specified herein and maintain that insurance throughout the term of this Agreement. Business shall be fully responsible for the acts and omissions of its subcontractors or other agents.

A. Workers’ Compensation. Business shall, at its sole cost and expense, maintain Statutory Workers’ Compensation Insurance and Employer’s Liability Insurance for any and all persons employed directly or indirectly by Business in the amount required by applicable law.

B. Commercial General and Automobile Liability Insurance.

1. General requirements. Business, at its own cost and expense, shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not less than $2,000,000 per occurrence and $4,000,000 aggregate, combined single limit coverage for risks associated with the work contemplated by this Agreement.

2. Minimum scope of coverage. Commercial general coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (most recent edition) covering comprehensive General Liability on an “occurrence” basis.

Automobile coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (most recent edition) covering any auto (Code 1), or if Business has no owned autos, hired (code 8) and non-owned autos (Code 9). No endorsement shall be attached limiting the coverage.

3. Occurrence Basis. The Commercial General and Automobile Liability Insurance shall cover on an occurrence basis.

C. Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to each policy:

1. Additional Insured. City, its officers, officials, employees, agents, and volunteers shall be covered as additional insureds for liability arising out of work or operations on behalf of the Business, including materials, parts, or equipment furnished in connection with such work or operations; or automobiles owned, leased, hired, Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 36 of 178 ends

4902-7779-4910 v4
or borrowed by the Business. Coverage can be provided in the form of an endorsement to the Business’s insurance at least as broad as CG 20 10 11 85, or both CG 20 10 10 01 and CG 20 37 10 01.

2. Primary. For any claims related to this Agreement or the work hereunder, the Business’s insurance covered shall be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Business’s insurance and non- contributing.

3. Severability. The policy shall cover inter-insured suits and include a “separation of Insureds” or “severability” clause which treats each insured separately.

4. Cancellation or Modification Notice. Business agrees to give at least 30 days prior written notice to City before coverage is canceled or modified as to scope or amount.

5. Submittal Requirements. Business shall submit a Certificate of Liability Insurance in the amounts specified in this Agreement and an Additional Insured Endorsement as required for the General Commercial and Automobile Liability Polices.

6. Acceptability of Insurers. All insurance required by this Agreement is to be placed with insurers with a Bests' rating of no less than A:VII.

7. Deductibles and Self-Insured Retentions. Insurance obtained by the Business shall have a self-insured retention or deductible of no more than $100,000.

8. Wasting Policies. No policy required herein shall include a “wasting” policy limit (i.e. limit that is eroded by the cost of defense).

9. Waiver of Subrogation. Business hereby agrees to waive subrogation which any insurer or contractor may require from Business by virtue of the payment of any loss. Business agrees to obtain any endorsements that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 37 of 178 ends

4902-7779-4910 v4
The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Business, its employees, agents, and subcontractors.

10. Subcontractors. Business shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein, and Business shall ensure that City, its officers, officials, employees, agents, and volunteers are covered as additional insured on all coverages.

11. Excess Insurance. If Business maintains higher insurance limits than the minimums specified herein, City shall be entitled to coverage for the higher limits maintained by the Business.

Docusign Envelope ID: 5BC7FE0F-5076-4529-BACD-5E72B70F2644

Page 38 of 178 ends

ECONOMIC DEVELOPMENT SUBSIDY REPORT PURSUANT TO CALIFORNIA GOVERNMENT CODE SECTION 53083

ON ECONOMIC DEVELOPMENT INVENTIVE AGREEMENT BETWEEN THE CITY OF PITTSBURG AND CIELO SUPERMARKET PITTSBURG INC.

The following Summary Report has been prepared pursuant to California Government Code Section 53083. The report sets forth certain details of the Economic Development Incentive Agreement (“Agreement”) between the following parties:

1. The City of Pittsburg (“City”), a municipal corporation; and

2. Cielo Supermarket Pittsburg Inc., a California General Stock Corporation (“Business”).

The purpose of this Agreement is to effectuate economic development in the City. The purpose of this report is to provide the information required pursuant to Government Code Section 53083 in regard to the Agreement. This report shall remain available to the public and posted on the City’s website until the economic development subsidy, as further described in section II, is fully distributed.

I. Name and address of all corporations or any other business entities, except for sole proprietorships, that are the beneficiary of the economic development subsidy:

Cielo Supermarket Pittsburg Inc.
1231 Thompson Road
Napa, CA 94558
Attn: Fabiola Gomez

II. Start and end dates and schedule, if applicable, for the economic development subsidy:

The proposed economic development subsidy expires on December 31, 2029, or earlier when the allotted amounts for each of the two subsidies (Permit Fee Waiver and Sales Tax Rebate) are fully remitted.

III. Description of the economic development subsidy, including the estimated total amount of the expenditure of public funds by, or of revenue lost to, the local agency as a result of the economic development subsidy:

The City is providing the Business with a fee waiver on City building permit fees up to a maximum amount of $77,500, contingent on conditions met in Section 6.2 of the proposed agreement. The City will also provide the Business, upon all conditions met in Section 6.1 of the proposed agreement, with a quarterly sales tax rebate of 50% of receipts until a grand total amount $42,500 has been rebated back to the Business. In total, the City agrees to provide the Business with a contribution equal to the maximum of One Hundred and Twenty Thousand Dollars ($120,000), so long as it is less than two percent (2%) of the total cost of the Project.

Page 39 of 178 ends

IV. Statement of the public purposes for the economic development subsidy:

The Pittsburg City Council has determined that encouraging economic development, including private investment that involves creation of new jobs and income in the City, or the retention of existing jobs and income that would otherwise be lost or be unavailable to the residents of the City, is a valid exercise of its powers and provides an important public benefit and serves an important public purpose. By authorizing the City to enter into this Agreement, the City Council has determined that the benefits accruing as a result of the transactions contemplated by this Agreement, including, without limitation, (i) the addition of a new full-service grocery store amenity to a location that has been built for, but vacant a grocery store for over six years; (ii) increased revenues from property and sales taxes; (iii) enhanced economic opportunities generated by the development of a new grocery store serving Pittsburg, and (iv) the addition of approximately 70 full-time jobs, 20 part-time jobs, and 65 temporary construction jobs.

V. The projected tax revenue to the local agency as a result of the economic development subsidy:

The City expects to receive increases in sales taxes and property taxes over the long term as a result of supporting the establishment of this full-service grocery store. The current City sales tax rate is 9.25% on qualified products and services.

Of that 9.25% rate, 1.5% goes directly to the City of Pittsburg. That means when the business produces one million dollars in taxable sales revenue, the City receives $15,000 of sales tax revenue from those sales.

The assessed value of the shopping center as of 2025 is $7.3 million dollars.

Within the site’s tax rate area, the City receives 18.478% of the general property tax levy of 1.0% of assessed value, with the balance of the collected property taxes going to other taxing jurisdictions. At this level of value, the shopping center where the project is located generates $13,489 in property tax income to the City of Pittsburg.

VI. Job Creation:

The Project is projected to create the following number of temporary jobs during construction, and full-time and part-time jobs during operation:

Full-time jobs: 70
Part-time jobs: 20
Temporary construction jobs: 65

Page 40 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor and Council Members

FROM: Maria M. Aliotti - Interim City Manager

SUBJECT: Adoption of a City Council Resolution Authorizing Execution of a Reimbursement Agreement with East Contra Costa
Regional Fee and Financing Authority for Project 2019 – BART Pedestrian and Bicycle Connectivity

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

The East Contra Costa Regional Fee and Financing Authority (ECCRFFA) supports the establishment and administration of a uniform regional development fee program that funds and implements regional road improvement projects in the East County area.

This resolution will authorize the execution of a Reimbursement Agreement between ECCRFFA and the City of Pittsburg to fund the design phase for Project 2019 – BART Pedestrian and Bicycle Connectivity (Project).

FISCAL IMPACT

This Reimbursement Agreement will allow ECCRFFA to reimburse the City $3,551,824 for the cost of improvements to California Avenue. These improvements were funded through a combination of State and Federal grants, Local Traffic Mitigation Fees, Measure J, and Measure M. This reimbursement will allow the remaining local funds to be returned to their funding source at the completion of the project.

An updated CIP sheet is attached.

RECOMMENDATION

City Council adopt the attached resolution authorizing the City Manager to execute the Reimbursement Agreement for Project 2019 – BART Pedestrian and Bicycle Connectivity.

Page 41 of 178 ends

BACKGROUND

On August 9, 1994, Antioch, Brentwood, Pittsburg, and Contra Costa County formed the ECCRFFA, a separate joint powers agency, by entering into an agreement that would support the establishment and administration of a uniform regional development fee program that funds and implements regional road improvement projects in the East County area. Five amendments have been made between 1999 and 2024.

On March 4, 2024, the City Council adopted Resolution 24-14440, accepting the plans and specifications and awarding a contract for Project construction.

On June 12, 2025, the ECCRFFA Board of Directors approved Resolution 25/07 authorizing the Program Manager to negotiate and execute an ECCRFFA standard Reimbursement Agreement with the City to reimburse the City $3,551,824 for ECCRFFA’s share of the California Avenue project.

SUBCOMMITTEE FINDINGS

This item was presented to the Infrastructure and Transportation Subcommittee on May 22, 2025.

STAFF ANALYSIS

ECCRFFA collects a uniform regional development impact fee for projects of regional significance. This list is composed of projects submitted by each member agency and approved by the ECCRFFA Board. These projects become eligible for funding once they are classified as a priority project and added to the ECCRFFA Strategic Plan.

The ECCRFFA project list includes a project to widen California Avenue from 2-lanes to 4-lanes from Railroad Avenue to Loveridge Road. The section of California Avenue from Harbor Street to Loveridge Road has previously been completed, leaving the section between Railroad Avenue and Harbor Street.

As part of the Project, California Avenue was widened to 3-lanes and a class I bicycle and pedestrian pathway was constructed on the south side. City staff submitted a request to receive reimbursement from ECCRFFA for the California Avenue related improvements of the Project in exchange for considering the California Avenue Widening project as complete.

ATTACHMENTS: Resolution
Reimbursement Agreement
ECCRFFA Resolution 25/07
Updated CIP Sheet

Report Prepared By: John Samuelson, Public Works Director/City Engineer

Page 42 of 178 ends

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing the Execution of a )
Reimbursement Agreement with East )
Contra Costa Regional Fee and Financing) RESOLUTION NO. 25- Authority for Project 2019 – BART )
Pedestrian and Bicycle Connectivity )

WHEREAS, on August 9, 1994, Antioch, Brentwood, Pittsburg, and Contra Costa County formed the East Contra Costa Regional Fee and Financing Authority (ECCRFFA), a separate joint powers agency, by entering into an agreement that would support the establishment and administration of a uniform regional development fee program that funds and implements regional road improvement projects in the East County area. Five amendments have been made between 1999 and 2024; and

WHEREAS, on March 4, 2024, the City Council adopted Resolution 24-14440, accepting the plans and specifications, and awarding a contract for construction of Project 2019 – BART Pedestrian and Bicycle Connectivity (Project); and

WHEREAS, on June 12, 2025, the ECCRFFA Board of Directors approved Resolution 25/07 authorizing the Program Manager to negotiate and execute an ECCRFFA standard reimbursement agreement with the City to reimburse the City $3,551,824 for ECCRFFA’s share of the Project on California Avenue.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pittsburg authorizes the City Manager to execute the Reimbursement Agreement with the East Contra Costa Regional Fee and Financing Authority for Project 2019 – BART Pedestrian and Bicycle Connectivity.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor

ATTEST BY:

Alice E. Evenson, City Clerk

Page 43 of 178 ends

1 REIMBURSEMENT, WAIVER, AND RELEASE AGREEMENT BETWEEN THE

EAST CONTRA COSTA REGIONAL FEE AND FINANCING AUTHORITY AND

THE CITY OF PITTSBURG

Relative to:

California Avenue Project

This Reimbursement Agreement (“Agreement”) is entered into as of ________, 2025 (“Effective Date”), by and between the East Contra Costa Regional Fee and Financing Authority (“ECCRFFA”), a joint exercise of powers agency organized as a separate entity by the cities of Antioch, Brentwood, Oakley, and Pittsburg and the County of Contra Costa, and the City of Pittsburg (“CITY”), a municipal corporation (ECCRFFA and the CITY are sometimes collectively referred to as the “Parties,” and each as a “Party”).

RECITALS

A. ECCRFFA is a joint exercise of powers entity among the cities of Antioch, Brentwood, Oakley, and Pittsburg, and Contra Costa County (“Member Agencies,” and each a “Member Agency”). ECCRFFA receives revenues from regional transportation development impact mitigation (“RTDIM”) fees that the Member Agencies impose on new developments under fee ordinances adopted by those agencies.

B. RTDIM fees fund projects on ECCRFFA’s project list based on the priority given to the projects in the ECCRFFA joint exercise of powers agreement among the Member Agencies, as amended (the “JEPA”). From time to time, the Board of Directors updates the ECCRFFA strategic plan (“Strategic Plan”) to allocate RTDIM fee revenues to ECCRFFA projects consistent with funding priorities in the JEPA and any funding priorities approved by the Board of Directors.

C. The California Avenue (Railroad Avenue to Harbor Street) Project (“Project”) was included in the 2005 East Contra County Regional Fee Program Update. In June 2025, ECCRFFA’s Board of Directors approved an updated Strategic Plan that included $3.56 million in funding for ECCRFFA’s regional share of the Project costs, which amount represents ECCRFFA’s funding obligation for costs to design, construct, manage, and acquire right of way for the Project (the “Reimbursable Costs”). The Reimbursable Costs are determined to be slightly lower than the amount in the June 2025 Strategic Plan, and are in the amount of $3,551,824.20.

D. ECCRFFA and CITY desire to enter into this Agreement to allow the Reimbursable Costs to be paid to CITY to satisfy ECCRFFA’s funding obligation for the Project.

Page 44 of 178 ends

2 AGREEMENT

Now, therefore, ECCRFFA and the CITY agree as follows:

1. Recitals. The Parties agree that the above recitals are true and are incorporated in and made a part of this Agreement.

2. Term. The term of this Agreement begins on the Effective Date, and it expires upon the date on which the Reimbursable Costs in the amount of $3,551,824.20 are paid to CITY.

3. ECCRFFA’s Reimbursement Commitment. ECCRFFA will reimburse the CITY for the Reimbursable Costs within 60 days after the Effective Date by delivering a check, made payable to CITY, to CITY’s address specified in Section 6 of this Agreement.

4. CITY’s Waiver and Release of Claims; Indemnification.

a. Release. Effective upon the date on which ECCRFFA reimburses CITY for the Reimbursable Costs under Section 3, the CITY does hereby release and discharge ECCRFFA and its other Member Agencies, and their officers, employees, agents, contractors, attorneys, successors, and assigns (collectively, “Released Entities”), from any and all claims, demands, causes of action, obligations, damages, attorney’s fees, costs, judgments, and liabilities (collectively, “Liabilities”) that the CITY has or could assert against any Released Entities, in any manner related to or arising from the Released Entities’ obligation to reimburse the CITY for costs that the CITY incurred to design, construct, manage, and acquire right of way for the Project, including payment to City any Reimbursable Costs. The CITY knowingly waives its right to make any claim against the Released Entities for such damages and expressly waives all rights provided by section 1542 of the California Civil Code, which provides as follows:

“A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE

CREDITOR DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER FAVOR

AT THE TIME OF EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM

OR HER MUST HAVE MATERIALLY AFFECTED HIS SETTLEMENT WITH THE DEBTOR.”

b. Indemnification. Effective upon the date on which ECCRFFA reimburses CITY for the Reimbursable Costs under Section 3, the CITY shall fully defend, indemnify, and hold the Released Entities harmless for any and all liabilities, costs, expenses, demands, damages, claims, causes of action, fines, penalties, judgments, attorney’s fees, and attorney’s fee awards (collectively, “Liabilities”) that arise from or are connected with the design, construction, construction management, right-of-way acquisition, maintenance, operation, or repair of the Project. Provided, however, that CITY shall not be required to indemnify any Released Entity from the proportion of any Liabilities that arise from the negligence or willful misconduct of that Released Entity.

Page 45 of 178 ends

3 c. Survival. The requirements of this Section 4 shall survive the termination or expiration of this Agreement.

5. Audit. In order to make audits, ECCRFFA shall have the right of access to any books, documents, papers, and other records of the CITY that are pertinent to ECCRFFA’s reimbursement of Reimbursable Costs under this Agreement. During the term of this Agreement and for a period of three (3) years following its expiration (the “Audit Period”), the CITY shall keep and maintain accurate financial accounts, in accordance with generally acceptable accounting principles, of all Reimbursable Costs. During the Audit Period, the CITY shall provide ECCRFFA copies of accounting records regarding the Reimbursable Costs and ECCRFFA’s reimbursement of those costs within 10 days after ECCRFFA’s written request, and the CITY shall make those records available for inspection during the CITY’s normal business hours, at the CITY’s offices, or the offices of its financial consultant. During the Audit Period, the CITY shall account for all Reimbursable Costs and shall provide ECCRFFA a written summary and current total of those costs within 30 days after a request by ECCRFFA. The requirements of this Section 5 shall survive the termination or expiration of this Agreement.

6. Notices. All notices, payments, and other correspondence required to be given under this Agreement shall be in writing, and shall be delivered in person, by overnight delivery, or by U.S. Mail, to the following:

To ECCRFFA:

Dale Dennis, Program Manager
c/o Contra Costa County Public Works Department
255 Glacier Drive
Martinez, CA 94553

To CITY:

City of Pittsburg
ATTN: City Manager
65 Civic Avenue
Pittsburg, CA 94565

or to such other address as each Party may respectively designate by written notice to the other Party. A notice or other correspondence shall be deemed given on the same day if it is personally delivered, on the next day if it is delivered by overnight delivery, or on the fifth (5th) day after the postmark date if it is given by U.S. Mail. A courtesy copy of a notice or other correspondence may be sent by email, as long as the notice or other correspondence also is given in a manner expressly authorized by this section.

7. Assignment. This Agreement shall inure to the benefit of and shall be binding upon the successors and assigns of the Parties hereto. This Agreement may not be assigned by either Party unless the assignment is approved in writing by the other Party.

Page 46 of 178 ends

4 8. Modification. This Agreement may not be modified or amended except in a writing signed by both Parties hereto.

9. Construction. The section headings and captions of this Agreement are, and the arrangement of this Agreement is, for the sole convenience of the Parties to this Agreement.

The section headings, captions, and arrangement of this Agreement do not in any way affect, limit, amplify, or modify the terms and provisions of this Agreement. This Agreement shall not be construed as if it had been prepared by one of the Parties, but rather as if all Parties have prepared it. The Parties to this Agreement and their attorneys have read and reviewed this Agreement and agree that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not apply to the interpretation of this Agreement. The recitals of this Agreement are, and shall be enforceable as, a part of this Agreement.

10. No Third-Party Beneficiaries. Except for CITY’s release of all Released Entities and its obligation to indemnify all Released Entities contained in Section 4, nothing in this Agreement, express or implied, is intended to confer on any person, other than the Parties and their successors and assigns, any rights or remedies by reason of this Agreement.

11. Waiver. A waiver of breach of any covenant or provision in this Agreement shall not be deemed a waiver of any other covenant or provision in this Agreement, and no waiver shall be valid unless in writing and executed by the waiving party.

12. Specific Performance. The sole remedy for violation of this Agreement shall be the specific performance of this Agreement.

13. Governing Law. This Agreement shall be governed and construed in accordance with the laws of the State of California.

14. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original.

15. Attorney’s Fees. In any action or proceeding to enforce or interpret any provision of this Agreement, or where any provision hereof is validly asserted as a defense, each Party shall bear its own attorney’s fees, costs, and expenses.

[Remainder of page intentionally left blank - signatures on next page.]

Page 47 of 178 ends

5 CITY OF PITTSBURG EAST CONTRA COSTA REGIONAL

FEE & FINANCING AUTHORITY

____________________________ ______________________________ Maria M. Aliotti, Interim City Manager Dale Dennis, Program Manager

Approved as to Form: Approved as to Form:

Thomas L. Geiger, County Counsel

____________________________ _____________________________ Donna Mooney, City Attorney By Stephen M. Siptroth
Assistant County Counsel

Page 48 of 178 ends

EAST CONTRA COSTA

REGIONAL FEE AND FINANCING AUTHORITY
Antioch – Brentwood – Pittsburg – Pittsburg and Contra Costa County B
oard of Directors:

Susannah Meyer, City of Brentwood - Chair
Aaron Meadows, City of Oakley - Vice Chair
Juan Banales, City of Pittsburg
Diane Burgis, Contra Costa County
Ron Bernal, City of Antioch
APPROPRIATION RESOLUTION NO. 25/07 A RESOLUTION OF THE EAST CONTRA COSTA

REGIONAL FEE AND FINANCING AUTHORITY (ECCRFFA) APPROPRIATING FUNDS TO

THE CALIFORNIA AVENUE PROJECT IN ACCORDANCE WITH COOPERATIVE AGREEMENT NO. 14-25 BETWEEN ECCRFFA

AND CITY OF PITTSBURG (CITY)

FOR THE CALIFORNIA AVENUE PROJECT
WHEREAS, the East Contra Costa Regional Fee and Financing Authority (“ECCRFFA”) Strategic Plan, dated June 12 , 2025, (“Strategic Plan”) includes $3,560,000 for the California Avenue Project (“PROJECT”); and
WHEREAS, ECCRFFA and CITY have entered into a Cooperative Agreement No. 14-25 regarding the funding of the PROJECT; and
WHEREAS, CITY has submitted a Request for Appropr iation of Funds (“Request”) and an overall financial plan for the PROJECT pursuant to Cooperative Agreement No. 14-25; and WHEREAS, ECCRFFA’s Program Manager has reviewed the Request and has determined that (1) the Request is for Eligible Project Costs, as defined in Cooperative Agreement No. 14-25, and (2) the request is consistent with the most recent ECCRFFA Strategic Plan.

NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE EAST CONTRA COSTA REGIONAL FEE AND FINANCING AUTHORITY, AS FOLLOWS:

RESOLVED, that the Request is consistent with the Strategic Plan and Cooperative Agreement No. 14-25; and
RESOLVED, that the scope of work and conditions set forth in Attachment A of this RESOLUTION, which is incorporated herein as set though set forth at length, are hereby approved; and

Page 49 of 178 ends
Page 50 of 178 ends

ATTACHMENT A

EAST CONTRA CITY REGIONAL FEE AND FINANCING AUTHORITY
APPROPRIATION RESOLUTION NO. 25/07
Date: June 12, 2025

Amount of Funds: $3,560,000

Appropriated to: City of Pittsburg

Specific Project: California Avenue (Project)

Appropriated For: Construction Phase Costs for Project

Scope of Work: Construction Phase

Other Conditions:

1. Subject to the PROJECT’s inclusion in ECCRFFA’s Strategic Plan and subject to availability of RTDIM funds collected , ECCRFFA’S obligation to provide the CITY funds for ELIGIBLE PROJECT COSTS under an adopted funding resolution is expressly made subject to ECCRFFA’s receipt of sufficient RTDIM funds to both (a) meet other ECCRFFA obligations, and (b) provide funding under the funding resolution, both as determined by ECCRFFA in its sole discretion.

2. ECCRFFA regional share of the Construction Phase Costs is 100% of the actual Construction Phase Costs and may be more or less than the allocation of $3,560,000. If the costs come in higher than $3,560,000, CITY would need to return to ECCRFFA to request additional funding.

3. ECCRFFA’s obligations under this funding resolution are subject to the terms and conditions of Cooperative Agreement No. 14-25.

Staff Comments: None

Page 51 of 178 ends

ATTACHMENT A

EAST CONTRA CITY REGIONAL FEE AND FINANCING AUTHORITY
APPROPRIATION RESOLUTION NO. 25/07
Total Funds Programmed in the East Contra Costa Regional Fee and Financing Authority Strategic Plan approved on June 12, 2025, for the entire California Avenue Project (ECCRFFA’s Strategic Plan currently in effect):

Period Amount
FY 2025/26 $3,560,000

Total $3,560,000

Total Authorization to Date:

Total funds appropriated to date under Cooperative Agreement No. 14-25 for the Project, including this appropriation, are $3,560,000.

Resolution Adopted: 06/12/2025
Appropriation Resolution No: 25/07
Coop Agreement No: 14-25
Project Sponsor: CITY
Resolution Amount: $3,560,000

Page 52 of 178 ends

ATTACHMENT B

EAST CONTRA COUNTY REGIONAL FEE AND FINANCING AUTHORITY APPROPRIATION RESOLUTION NO. 25/07

COOPERATIVE AGREEMENT No. 14-25
between

EAST CONTRA COUNTY REGIONAL FEE AND FINANCING AUTHORITY and

CITY OF PITTSBURG

EXHIBIT B
Chronological Listing of Fund Appropriation Resolutions

Project Name

Resolution
Number

DATE

FUNDS

APPROPRIATED

CUMULATIVE
TOTAL

California Avenue Project

25/07

6/12/2025

$3,560,000

$3,560,000

TOTAL FUNDS APPROPRIATED: $3,560,000

Page 53 of 178 ends

City of Pittsburg 2025/26 – 2029/30 Capital Improvement Program

Project Title: Project #:

BART Pedestrian & Bicycle Connectivity 2019

Description/Justification:

The Project encompasses the installation of a Class II buffered bicycle lane along Railroad Ave nue from California Avenue to East 17th Street. This work will include slurry seal, and the installation of roadside signs and pavement striping and markings.

Additionally, a Class I path along the west side of Railroad Ave from State Route 4 (SR -4) to the Delta De Anza Regional Trail will be installed. Along the SR-4 East-bound on-ramp from the BART parking facility to Railroad Avenue, a Class I path will be installed along the north side of the adjacent properties within Caltrans right-of-way. These improvements will enhance safety and security within the BART vicinity. During the Bid Opening phase a dditional improvements such as “Alternate A” – The street and trail lighting along California Avenue and “Alternate D” – Railroad Avenue path lighting have been added to the project scope.

Supplemental Information:

Caltrans has relinquished to the City of Pittsburg a portion of S R-4 consisting of Class I bikeways south of California Avenue between Railroad Avenue and Harbor Street.

Federal/State Funding Sources: One Bay Area Grant 2 (OBAG2) ; Pedestrian, Bicycle, and Trail Facilities (PBTF Grant) ; Safe Routes to Bart (SR2B); and Transportation Development Act (TDA Grant).

PROJECT EXPENDITURES Prior 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL 1101 Staff Time $91,439 $95,000 $5,000 191,439$
2122 Design $955,790 $5,000 960,790$
2281 Construction $6,000,000 $1,716,000 7,716,000$
2372 Administrative Overhead $88,235 $95,000 $5,000 188,235$ TOTAL 1,135,464$ 6,195,000$ 1,726,000$ 9,056,464$ PROJECT FUNDING Prior 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL Federal/State Funding $5,228,000 5,228,000$
303 Local TMF $3,225,000 $64,000 3,289,000$
204 Measure J $515,050 515,050$
111 Measure M $25,000 25,000$
$3,551,824 3,551,824$
TOTAL 8,993,050$ 3,615,824$ 12,608,874$

PROJECT FINANCING CURRENT PROPOSED

ECCRFFA
Project Category: Roadway Infrastructure
Location: Railroad Ave, California Ave, and Bliss
Ave
Project Manager: K. Labao
Project Priority: 1A – Essential
Project Status: Construction
Est. Completion Date: 2025/26

Page 54 of 178 ends

Combined Agency/City Council Minutes Page 1 of 4 September 15, 2025

CITY OF PITTSBURG

CITY COUNCIL/AGENCY CONCURRENT MEETING MINUTES

DATE: September 15, 2025

LOCATION: Council Chamber, City Hall, 65 Civic Avenue, Pittsburg, CA 94565

CITY COUNCIL/AGENCY MEMBERS
Jelani Killings, Mayor/Chair
Dionne Adams, Vice-Mayor/Chair
Angelica Lopez, Council/Agency Member
Juan Antonio Banales, Council/Agency Member
Arlene Kobata, Council/Agency Member
S.L. Floyd, Agency Member
Annie Hill Herring, Agency Member

APPOINTED OFFICIALS
Maria M. Aliotti, Acting City Manager/Acting Executive Director Donna Mooney, City Attorney/Legal Counsel
Alice E. Evenson, City Clerk/Agency Secretary (elected) Nancy Parent, City Treasurer (elected)

Mayor Killings called the regular meeting to order at 7:01 P.M. in the Council Chamber at City Hall, 65 Civic Avenue Pittsburg, CA. after having convened in Closed Session at 5:32 P.M. for the following Closed Session:

1. CONFERENCE WITH LEGAL COUNSEL—EXISTING LITIGATION pursuant to Section 54956.9(d)(1)
Center for Biological Diversity v. City of Pittsburg et al, Contra Costa County Superior Court, case no. N24-2162

City Attorney Mooney stated that an update was provided to the City Council and there were no reportable actions taken.

2. CONFERENCE WITH LABOR NEGOTIATORS Pursuant to Section 54957.6:

City designated representatives: Garrett Evans, Maria Aliotti, Jennifer Brizel, Jordan Davis Employee organizations: Pittsburg Police Managers Group

City Attorney Mooney stated that the City Council provided direction to staff, and there were no reportable actions taken.

3. PUBLIC EMPLOYMENT Pursuant to Section 54957
City Manager

City Attorney Mooney stated that an update was provided to the City Council and there were no reportable actions taken.

4. CONFERENCE WITH REAL PROPERTY NEGOTIATORS pursuant to Section 54956.8 Property: 1000 Center Drive APN 086-100-049;-050;-051;-052 City negotiators: Maria Aliotti, Jordan Davis

Page 55 of 178 ends

Combined Agency/City Council Minutes Page 2 of 4 September 15, 2025 Negotiating party: Discovery Builders Inc.

Under negotiation: Price and terms of payment

City Attorney Mooney stated that the City Council provided direction to staff, and there were no reportable actions taken

ROLL CALL

Vice Mayor Adams and Member Banales were absent and excused.

PLEDGE OF ALLEGIANCE

Mayor Killings led the Pledge of Allegiance.

PRESENTATIONS

5. Presentation on Temporary Outdoor Food Vendors

Mayor Killings noted for the record that this presentation would be moved to a later date.

PROCLAMATIONS

6. Inspire Pittsburg – Pittsburg Kiwanis

7. National Hispanic Heritage Month

CITY MANAGER REPORTS/REMARKS

Acting City Manager Aliotti gave an update on upcoming community events.

PUBLIC COMMENTS

Laura Millison introduced herself as the new Library Manager for Pittsburg and provided an update on current library events.

COMMITTEE REPORTS

Member Lopez attended the Life Enrichment and Public Safety Subcommittee meetings.

Mayor Killings attended the Community and Economic Development Subcommittee meeting.

PUBLIC HEARING

8. Adoption of a City Council Resolution Approving the 2024-2025 Community Development Block Grant Consolidated Annual Performance and Evaluation Report

Mayor Killings opened the Public Hearing. There being no one to speak on the item, Mayor Killings closed the Public Hearing

Page 56 of 178 ends

Combined Agency/City Council Minutes Page 3 of 4 September 15, 2025 On Motion by Member Lopez, seconded by Member Kobata and adopted by the following vote:

AYES: Kobata, Lopez, Killings
ABSENT: Adams, Banales

CONSIDERATION

9. Adoption of a City Council Resolution Authorizing the City Manager to Execute an Intergovernmental Support Agreement with Military Ocean Terminal Concord for Small Construction and Design Services

On Motion by Member Lopez, seconded by Member Kobata and adopted by the following vote:

AYES: Kobata, Lopez, Killings
ABSENT: Adams, Banales

10. Adoption of a City Council Resolution Authorizing the City Manager to Execute a Cooperative Agreement with East Contra Costa Regional Fee and Financing Authority for Project 2041 – Bailey Road Improvements Phase I

On Motion by Member Kobata, seconded by Member Lopez and adopted by the following vote:

AYES: Kobata, Lopez, Killings
ABSENT: Adams, Banales

CONFLICT OF INTEREST STATEMENT

Member Kobata recused herself from consent calendar items # 16 and 18 due to the proximity of her residence.

City Attorney Mooney recommended that both items be rescheduled to a future meeting.

COMBINED CITY COUNCIL, PITTSBURG ARTS AND COMMUNITY FOUNDATION,

PITTSBURG POWER COMPANY, SOUTHWEST PITTSBURG GHAD II AND SUCCESSOR

AGENCY CONSENT CALENDAR

Prior to adoption of the Consent Calendar, the Mayor read the following statement regarding Agenda Item 22:

In compliance with Government Code Section 54953(c)(3), for agenda item #22, it is recommended to adopt the resolution to appoint Maria Aliotti as Interim City Manager with a five percent (5%) salary increase for her service as Interim City Manager. This temporary salary increase reflects the additional responsibilities Ms. Aliotti will perform in this capacity during the recruitment period. The increased costs will be absorbed by the salary savings from the City Manager vacancy.

The following vote excludes consent calendar items 16 and 18

Page 57 of 178 ends

Combined Agency/City Council Minutes Page 4 of 4 September 15, 2025 On Motion by Member Lopez, seconded by Member Kobata and adopted by the following vote:

AYES: Kobata, Lopez, Killings
ABSENT: Adams, Banales

11. Minutes of August 18, 2025

12. Receive and File the Treasurer’s Report for the Quarter Ending June 30, 2025

13. Adoption of a City Council Resolution Designating a Voting Delegate and an Alternate for the League of California Cities 2025 Annual Conference and Expo

14. Adoption of a City Council Resolution Authorizing the City Manager to Negotiate and Execute a Contract for Meter Reading Supplies with Badger Meter, Inc.

15. Adoption of a City Council Resolution Accepting Project 2029 – Zone 4 Pavement Management as Complete and Authorizing the City Engineer to File a Notice of Completion

16. Adoption of a City Council Resolution Authorizing the City Manager to Accept a Community Grant from the United States Environmental Protection Agency and Enter into a Grant Agreement

17. Adoption of a City Council Resolution Authorizing Participation in Future Settlements Regarding Nationwide Opioid Litigation Settlements and Directing Funds to Contra Costa County

18. Adoption of a City Council Resolution Accepting Project 2028 – Crestview Drive Safety Improvements as Complete and Authorizing the City Engineer to File a Notice of Completion

19. Adoption of a City Council Resolution Accepting the Plans and Specifications and Awarding Project 3333 – California Theatre Restroom

20. Adoption of a City Council Resolution Accepting Project 2038 – Citywide Roadway Improvements as Complete and Authorizing the City Engineer to File a Notice of Completion

21. Adoption of a City Council Resolution Accepting the Military Equipment Annual Report, Determining the Use of Equipment Complied with Policy 706, and Determining that Policy 706 will Continue

22. Adoption of a City Council Resolution Appointing Maria Aliotti as Interim City Manager

23. Adoption of a Pittsburg Power Company Resolution Approving the 2024 Annual Power Source Disclosure Report to the California Energy Commission

COUNCIL REQUEST FOR FUTURE AGENDA ITEMS

Page 58 of 178 ends

Combined Agency/City Council Minutes Page 5 of 4 September 15, 2025 There were no requests for future agenda items.

COUNCIL MEMBER REMARKS

Member Lopez encouraged community members to support Hispanic-owned businesses in honor of Hispanic Heritage Month.

ADJOURNMENT

The meeting adjourned at 8:00 P.M. to October 6, 2025.

Respectfully submitted,

Alice E. Evenson, City Clerk

Page 59 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor and Council Members

FROM: Maria M. Aliotti - Interim City Manager

SUBJECT: Adoption of a City Council Resolution Authorizing Execution of Consulting Services Agreement with Raney Planning &
Management, Inc. for California Environmental Quality Act (CEQA) Analysis and Permitting for Project 3038 - West
Leland Road Extension Phase II

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

Project 3038 - West Leland Road Extension Phase II (Project) is the construction of an extension of West Leland Road, from Santa Teresa Drive to Avila Road, to enhance traffic circulation. The Project requires analysis of environmental impact under California Environmental Quality Act (CEQA) and permitting for construction. Adoption of this Resolution will authorize the City Manager to execute a Consulting Services Agreement (Agreement) with Raney Planning & Management, Inc. for CEQA analysis and permitting for the Project.

FISCAL IMPACT

The total compensation for the Agreement is $374,213. Funding will be provided from the current approved Project budget. No additional funds are being requested.

RECOMMENDATION

City Council adopt the Resolution authorizing the City Manager to execute the Consulting Services Agreement with Raney Planning & Management, Inc. for CEQA analysis and permitting for an amount not to exceed $374,213.

Page 60 of 178 ends

BACKGROUND

On June 12, 2025, East Contra Costa Regional Fee and Financing Authority (ECCRFFA) adopted Resolution No. 25/03 which appropriated $33,380,000 to the Project for design and construction in accordance with Cooperative Agreement No.18-25 between ECCRFFA and the City.

On June 16, 2025, the City Council adopted Resolution No. 25-14636, authorizing execution of a Cooperative Agreement with ECCRFFA for the Project.

The City advertised a Request for Proposals for professional services for CEQA analysis and permitting, and received and evaluated three proposals from consulting firms.

SUBCOMMITTEE FINDINGS

This item was not presented to a subcommittee meeting.

STAFF ANALYSIS

Staff reviewed and ranked the submitted proposals. Based on ratings of the received proposals and a comprehensive cost proposal review and fee negotiation, staff recommends awarding the design contract to Raney Planning & Management Inc. The scope of the environmental design services includes preparation of necessary technical studies, reports to support CEQA determination, and obtaining permitting for construction.

The Project will extend West Leland Road from its current terminus near Santa Teresa Drive in a westerly direction to Avila Road. The new road will be four lanes with a raised median, landscaping, sidewalks, and Class II bicycle lanes.

ATTACHMENTS: Resolution
Consulting Services Agreement

Report Prepared By: Savon Reese, Associate Engineer

Page 61 of 178 ends

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing Execution of Consulting )
Services Agreement with Raney Planning & )
Management, Inc. for the CEQA Analysis ) RESOLUTION NO. 25- And Permitting for Project 3038-West Leland )
Road Extension Phase II )

WHEREAS, Project 3038-West Leland Road Extension Phase II (Project) is the construction of an extension of West Leland Road, from Santa Teresa Drive to Avila Road, to enhance traffic circulation; and

WHEREAS, the City advertised a Request for Proposals for professional services for California Environmental Quality Act (CEQA) analysis and permitting; and

WHEREAS, City staff received and evaluated three proposals from consulting firms. Based on ratings of the received proposals and a comprehensive cost proposal review and fee negotiation, staff recommends awarding the design contract to Raney Planning & Management Inc.; and

WHEREAS, on June 12, 2025, East Contra Costa Regional Fee and Financing Authority (ECCRFFA) adopted Resolution No. 25/03 which appropriated funds to the Project for design and construction in accordance with Cooperative Agreement No.18- 25 between ECCRFFA and the City; and

WHEREAS, on June 16, 2025, the City Council adopted Resolution No. 25- 14636, authorizing execution of a Cooperative Agreement with ECCRFFA for Project 3038 West Leland Road Extension Phase II.

NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Pittsburg hereby authorizes the City Manager to execute the Consulting Services Agreement with Raney Planning & Management, Inc.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor
ATTEST BY:

Alice E. Evenson, City Clerk

Page 62 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 1 of 12

CONSULTING SERVICES AGREEMENT BETWEEN

THE CITY OF PITTSBURG AND
RANEY PLANNING & MANAGEMENT, INC.

Project 3038 West Leland Road Extension Phase II

THIS Agreement (“Agreement”) for consulting services is made by and between the City of Pittsburg (“City”) and Raney Planning & Management, Inc., a California corporation (“Consultant”) (together referred to as the “Parties”) as of October 7, 2025 (the “Effective Date”).

Section 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in the Scope of Work attached as Exhibit A, and incorporated herein, at the time and place and in the manner specified therein.

1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on September 30, 2028 or the date the Consultant completes the services specified in Exhibit A, whichever occurs first, unless the term of the Agreement is otherwise terminated or extended, as referenced herein.

1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement according to the standards observed by a competent practitioner of the profession in which Consultant is engaged.

1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, requests in writing the reassignment of any such persons to ensure Consultant performs services in accordance with the Standard of Performance, Consultant shall, immediately upon receiving City’s request, reassign such persons.

1.4 Time. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to meet the standard of performance provided herein above and to satisfy Consultant’s obligations hereunder.

Section 2. COMPENSATION. City hereby agrees to pay Consultant a sum not to exceed Three Hundred Seventy-Four Thousand Two Hundred Thirteen Dollars ($374,213), as set forth in Exhibit B, attached hereto and incorporated herein for services to be performed and reimbursable expenses incurred under this Agreement.

This dollar amount is not a guarantee that the City will pay that full amount to the Consultant but is merely a limit of potential City expenditures under this Agreement.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 63 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 2 of 12

Consultant and City acknowledge and agree that compensation paid by City to Consultant under this Agreement is based upon Consultant’s estimated costs of providing the services required hereunder, including salaries and benefits of employees and subcontractors of Consultant. Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Consultant and its employees, agents, and subcontractors may be eligible. City therefore has no responsibility for such contributions beyond compensation required under this Agreement.

2.1 Invoices. Consultant shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date.

Invoices shall contain the following information, unless waived by the City Manager, or his or her designee:

▪ Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.;
▪ The beginning and ending dates of the billing period; ▪ A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion; ▪ At City’s option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense;
▪ The total number of hours of work performed under the Agreement by Consultant and each employee, agent, and subcontractor of Consultant performing services hereunder;
▪ The Consultant’s signature.
▪ Emailed to [email protected]

2.2 Monthly Payment. City shall make monthly payments, based on invoices received, for services satisfactorily performed, and for authorized reimbursable costs incurred. City shall pay undisputed invoices that comply with the above requirements within 30 days from the receipt of the invoice.

2.3 Final Payment. Consultant shall submit its final invoice within 60 days of completing its services. Consultant’s failure to submit its final invoice within this 60-day period shall constitute Consultant’s waiver of any further billings to, or payments from, City.

2.4 Reimbursable Expenses. Reimbursable expenses, if any, are specified in Exhibit B and included in the total compensation referenced in Section Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 64 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 3 of 12

2. Expenses not listed in Exhibit B are not chargeable to, or reimbursable by, City.

2.5 Payment of Taxes. Consultant is solely responsible for the payment of all federal, state and local taxes, including employment taxes, incurred under this Agreement.

2.6 Authorization to Perform Services. The Consultant is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of a written authorization from the City Manager, or his or her designee.

Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Consultant shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement

Section 4. INSURANCE REQUIREMENTS. Before beginning any services under this Agreement, Consultant, at its own cost and expense, shall procure the types and amounts of insurance specified herein and maintain that insurance throughout the term of this Agreement. The cost of such insurance shall be included in the Consultant’s bid or proposal. Consultant shall be fully responsible for the acts and omissions of its subcontractors or other agents.

4.1 Workers’ Compensation. Consultant shall, at its sole cost and expense, maintain Statutory Workers’ Compensation Insurance and Employer’s Liability Insurance for any and all persons employed directly or indirectly by Consultant in the amount required by applicable law. The requirement to maintain Statutory Workers’ Compensation and Employer’s Liability Insurance may be waived by the City upon written verification that Consultant is a sole proprietor and does not have any employees and will not have any employees during the term of this Agreement.

4.2 Commercial General and Automobile Liability Insurance.

4.2.1 General requirements. Consultant, at its own cost and expense, shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not less than $2,000,000 per occurrence and $4,000,000 aggregate, combined single limit coverage for risks associated with the work contemplated by this Agreement.

4.2.2 Minimum scope of coverage. Commercial general coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (most recent edition) covering comprehensive General Liability on an “occurrence” basis.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 65 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 4 of 12

Automobile coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (most recent edition) covering any auto (Code 1), or if Consultant has no owned autos, hired (code 8) and non-owned autos (Code 9). No
endorsement shall be attached limiting the coverage.

4.2.3 Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy:

a. The Commercial General and Automobile Liability Insurance shall cover on an occurrence basis.

b. City, its officers, officials, employees, agents, and volunteers shall be covered as additional insureds for liability arising out of work or operations on behalf of the Consultant, including materials, parts, or equipment furnished in connection with such work or operations; or automobiles owned, leased,
hired, or borrowed by the Consultant. Coverage can be
provided in the form of an endorsement to the Consultant’s insurance at least as broad as CG 20 10 11 85, or both CG 20 10 10 01 and CG 20 37 10 01.

c. For any claims related to this Agreement or the work hereunder, the Consultant’s insurance covered shall be
primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self- insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the
Consultant’s insurance and non-contributing.

d. The policy shall cover inter-insured suits and include a “separation of Insureds” or “severability” clause which treats each insured separately.

e. Consultant agrees to give at least 30 days prior written notice to City before coverage is canceled or modified as to scope or amount.

4.3 Professional Liability Insurance.

4.3.1 General requirements. Consultant, at its own cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing work pursuant to this Agreement in an amount not less than Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 66 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 5 of 12

$1,000,000 per occurrence or claim covering the Consultant’s errors and omissions.

4.3.2 Claims-made limitations. The following provisions shall apply if the professional liability coverage is written on a claims-made form:

a. The retroactive date of the policy must be shown and must be before the date of the Agreement.

b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Agreement or the work.

c. If coverage is canceled or not renewed and it is not replaced with another claims-made policy form with a retroactive date that precedes the date of this Agreement, Consultant must purchase an extended period coverage for a minimum of five (5) years after completion of work under this Agreement.

d. A copy of the claim reporting requirements must be
submitted to the City for review prior to the commencement of any work under this Agreement.

4.4 All Policies Requirements.

4.4.1 Submittal Requirements. Consultant shall submit the following to City prior to beginning services:

a. Certificate of Liability Insurance in the amounts specified in this Agreement; and

b. Additional Insured Endorsement as required for the General Commercial and Automobile Liability Polices.

4.4.2 Acceptability of Insurers. All insurance required by this Agreement is to be placed with insurers with a Bests' rating of no less than A:VII.

4.4.3 Deductibles and Self-Insured Retentions. Insurance obtained by the Consultant shall have a self-insured retention or deductible of no more than $100,000.

4.4.4 Wasting Policies. No policy required herein shall include a “wasting” policy limit (i.e. limit that is eroded by the cost of defense).

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 67 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 6 of 12

4.4.5 Waiver of Subrogation. Consultant hereby agrees to waive subrogation which any insurer or contractor may require from Consultant by virtue of the payment of any loss. Consultant agrees to obtain any endorsements that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Consultant, its employees, agents, and subcontractors.

4.4.6 Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for
subcontractors shall be subject to all of the requirements stated herein, and Consultant shall ensure that City, its officers, officials, employees, agents, and volunteers are covered as additional insured on all coverages.

4.4.7 Excess Insurance. If Consultant maintains higher insurance limits than the minimums specified herein, City shall be entitled to coverage for the higher limits maintained by the Consultant.

4.5 Remedies. In addition to any other remedies City may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: 1) obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement; 2) order Consultant to stop work under this Agreement and withhold any payment that becomes due to Consultant hereunder until Consultant demonstrates compliance with the requirements hereof; and/or 3) terminate this Agreement.

Section 5. INDEMNIFICATION AND CONSULTANT’S RESPONSIBILITIES.

5.1 General Requirement. To the fullest extent permitted by law, Consultant shall indemnify, defend with counsel acceptable to City, and hold harmless City and its officers, officials, employees, agents and volunteers (collectively, “Indemnitees”) from and against any and all liability, loss, damage, claims, expenses, and costs, including without limitation, attorney’s fees, costs and fees of litigation, (collectively, “Liability”) of every nature arising out of or in connection with Consultant’s performance of the services under this Agreement, or its failure to comply with any of its obligations contained in this Agreement, or its failure to comply with any Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 68 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 7 of 12

applicable law or regulation, except such Liability caused by the sole negligence or willful misconduct of City.

Acceptance by City of insurance certificates and endorsements required under this Agreement does not relieve Consultant from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply to any damage or claims for damages whether or not such insurance policies shall be determined to apply.

5.2 PERS Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Section 6. STATUS OF CONSULTANT.

6.1 Independent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and shall not be an employee of City.

6.2 Consultant Not an Agent. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever.

Section 7. LEGAL REQUIREMENTS.

7.1 Governing Law. The laws of the State of California shall govern this Agreement.

7.2 Compliance with Applicable Laws. Consultant and any subcontractors shall comply with all laws applicable to the performance of the work hereunder. Consultant shall also, to the extent required by the California Labor Code, pay not less than the latest prevailing wage rates as determined by the California Department of Industrial Relations.

7.3 Licenses and Permits. Consultant represents and warrants to City that Consultant and its employees, agents, and any subcontractors have, and Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 69 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 8 of 12

will maintain at their sole cost and expense, all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions. In addition to the foregoing, Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid business licenses from City.

7.4 Nondiscrimination and Equal Opportunity. Consultant shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, genetic information, marital status, sex, sexual orientation, gender or gender identity, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Consultant under this Agreement. Consultant shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Consultant thereby.

Section 8. TERMINATION AND MODIFICATION.

8.1 Termination. Upon ten days’ prior written notice, City may cancel this Agreement at any time and without cause upon such written notification to Consultant. In the event of termination, Consultant shall be entitled to compensation for services performed to the effective date of termination; City, however, may condition payment of such compensation upon Consultant delivering to City any or all documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or the City in connection with this Agreement.

8.2 Amendments. The parties may amend this Agreement only by a writing signed by the parties hereto.

8.3 Assignment and Subcontracting. City and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant’s unique personal competence, experience, and specialized personal knowledge.

Moreover, a substantial inducement to City for entering into this Agreement was and is the professional reputation and competence of Consultant. Consultant may not assign this Agreement or any interest therein without the prior written approval of the City Manager, or his or her designee. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the subcontractors Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 70 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 9 of 12

noted in the proposal, without prior written approval of the City Manager, or his or her designee.

8.4 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City and Consultant, including but not limited to the provisions of Section 5, shall survive the termination of this Agreement.

8.5 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, City’s remedies shall include, but not be limited to, the following:

8.5.1 Immediately terminate the Agreement;

8.5.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement;

8.5.3 Retain a different consultant to complete the work described in Exhibit A not finished by Consultant; or

8.5.4 Charge Consultant the difference between the cost to complete the work described in Exhibit A that is unfinished at the time of breach and the amount that City would have paid Consultant pursuant to Section 2 if Consultant had completed the work.

8.5.5 The remedies mentioned in this Agreement are not exclusive of any other right, power or remedy permitted by law. The City’s failure or delay in exercising any remedy shall not constitute a waiver of such remedy or preclude the further exercise of City’s rights.

Section 9. KEEPING AND STATUS OF RECORDS.

9.1 Records Created as Part of Consultant’s Performance. All final versions of reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the City.

Consultant hereby agrees to deliver those documents to the City upon termination of the Agreement, and the City may use, reuse or otherwise dispose of the documents without Consultant’s permission. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the City and are not necessarily Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 71 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 10 of 12

suitable for any future or other use. City and Consultant agree that, until final approval by City, all data, plans, specifications, reports and other documents are confidential drafts and will not be released to third parties by Consultant without prior written approval of City.

9.2 Consultant’s Books and Records. Consultant shall maintain any and all records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the City under this Agreement for a minimum of 3 years, or for any longer period required by law, from the date of final payment to the Consultant to this Agreement. All such records shall be maintained in accordance with generally accepted accounting principles and shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of the City. Pursuant to Government Code Section 8546.7, the Agreement may be subject to the examination and audit of the State Auditor for a period of 3 years after final payment under the Agreement.

Section 10 MISCELLANEOUS PROVISIONS.

10.1 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

10.2 Venue. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in Contra Costa County or in the United States District Court for the Northern District of California.

10.3 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

10.4 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement.

10.5 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the parties.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 72 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 11 of 12

10.6 Conflict of Interest. Consultant may serve other clients, but none whose activities within the corporate limits of City or whose business, regardless of location, would place Consultant in a “conflict of interest,” as that term is defined in the Political Reform Act, codified at California Government Code Section 81000 et seq.

Consultant shall not employ any City official in the work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq.

10.7 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials.

10.8 Notices. Any notice, demand, request, consent or approval that either party is required to give the other pursuant to this Agreement, shall be in writing and may be given by either (i) personal service, or (ii) certified United States mail, postage prepaid, return receipt requested. Notice shall be effective upon personal delivery or delivery to the addresses specified below, as reflected on the receipt of delivery or return receipt, as applicable.

Consultant : Raney Planning & Management, Inc.
1501 Sports Dr., Suite A
Sacramento, CA 95834

City: City of Pittsburg
65 Civic Avenue
Pittsburg, CA 94565
ATTN: City Manager

10.9 Professional Seal. Where applicable in the determination of the City Manager, or his or her designee, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in a block entitled “Seal and Signature of Registered Professional with report/design responsibility.”

10.10 Integration. This Agreement, including the scope of work attached hereto and incorporated herein as Exhibits A and B represents the entire and integrated agreement between City and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral.

To the extent there are any inconsistencies between this Agreement, the Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 73 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 12 of 12

Exhibits, and Consultant’s proposal, the Agreement shall control. To the extent there are any inconsistencies between the Exhibits and the Consultant’s Proposal, the Exhibits shall control.

Exhibit A Scope of Services
Exhibit B Compensation Schedule

10.11 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.

10.12 Construction of Agreement. Each party hereto has had an equivalent opportunity to participate in the drafting of the agreement and/or to consult with legal counsel. Therefore, the usual construction of an agreement against the drafting party shall not apply hereto.

10.13 No Third-Party Beneficiaries. This Agreement is made solely for the benefit of the parties hereto, with no intent to benefit any third parties.

The Parties have executed this Agreement as of the Effective Date.

CITY OF PITTSBURG RANEY PLANNING & MANAGEMENT, INC.

____________________________ ______________________________ Maria M. Aliotti Rod Stinson
Interim City Manager Vice President/Air Quality Specialist

Approved as to Form:

____________________________
Donna Mooney, City Attorney

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 74 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 1 of 17

EXHIBIT A

SCOPE OF SERVICES

Project 3038 West Leland Road Extension Phase II

Consultant shall perform the tasks set forth below. Consultant may utilize subconsultant with prior approval of City. Consultant shall be obligated to provide the services below regardless of whether they are performed by a subconsultant.

Task 1 Project Initiation

Consultant shall coordinate with City staff to confirm assumptions regarding the proposed project and scope of work. Vice President/Air Quality Specialist Rod Stinson shall serve as the Consultant Project Director and shall be responsible for overseeing the environmental review process and providing quality control.

Consultant Division Manager/Air Quality Specialist Angela DaRosa shall serve as the Project Manager and shall be responsible for managing the day-to-day preparation of the environmental document; coordinating with the City, outside agencies, and the project team; and responding to inquiries on the environmental document.

Consultant shall complete the following deliverables:
• Participate in a kick-off meeting with City staff to review project schedule/milestones;
• Review existing documentation for the project and identify key issues; • Confirm elements of the project description and potential project alternatives; • Identify the role that each shall play during the effort, as well as summary of meetings and products;
• Perform a site visit if necessary; and
• Refine the scope if necessary with any revisions for the City to approve.

Task 2 Peer Review of City-Provided Reports

Consultant shall conduct CEQA-level peer reviews of all City-provided technical reports to ensure their sufficiency for use in the environmental analysis. Consultant itself or by subconsultant approved by City shall perform technical peer reviews of the Preliminary Geotechnical Report and Hydrology/Drainage Report, respectively. Consultant shall review the reports to ensure all CEQA issues have been adequately and accurately addressed. If any revisions are necessary, Consultant shall coordinate with the City to have the reports revised.

Consultant shall complete the following deliverables:
• Preparation of comments on technical reports if necessary; and Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 75 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 2 of 17

• Coordinate with the City to have the reports revised if necessary.

Task 3 Agency Consultation and Resource Agency Permitting

Consultant shall provide agency coordination to internal and external agencies, assist the City with state law required tribal consultation, and assist the City with resource agency permitting.

Consultant shall assist the City with carrying out actions pursuant to applicable law, including preparation of tribal consultation letters.

Consultant shall complete the following deliverables:
• Coordinate with internal and external agencies, including City Public Works Department, etc.; and
• Assist City staff with state law required (Assembly Bill 52 of 2014) consultation, including preparation of tribal consultation letters if needed.

Resource Agency Permitting
Consultant itself or through a subconsultant approved by the City shall assist the City with obtaining all necessary resource agency permits. Consultant shall verify the presence of any aquatic resources during the preparation of the Wetland Delineation. If required, Consultant shall prepare the following permitting packages:
• U.S. Army Corps of Engineers (USACE) permitting application package; • California Regional Water Quality Control Board (RWQCB) Certification of Water Quality (“Section 401 Permit”) application package; and • Alternatives Analysis to support the RWQCB application.

Consultant shall confirm with the City before commencing any resource agency permitting tasks.

Consultant shall complete the following deliverables:
• Submit a USACE permitting application package to USACE; • Submit a RWQCB Certification of Water Quality (“Section 401 Permit”) application package to RWQCB; and
• Submit an Alternatives Analysis to RWQCB to support the RWQCB application.

Task 4 Project Description

Consultant shall prepare a draft project description in consultation with City staff.

The project description shall include a detailed project location, background, and history of the project (including past ownership and land uses); intended uses of Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 76 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 3 of 17

the proposed project; existing environmental setting; description of on- and off- site infrastructure necessary to serve the project; discretionary actions; project characteristics; important project features; project objectives; phasing; and permits and approvals that are required for the project based on available information.

Consultant shall complete the following deliverables:
• Submit electronic copies of the draft project description to the City for review and comment; and
• Submit electronic copies of the final project description to the City prior to incorporation into the EIR.

Task 5 Prepare Initial Study

Consultant shall prepare an Administrative Draft version of the IS for review by City staff. The IS shall be prepared based upon City standards and shall address all the issues identified in the Environmental Checklist, per Appendix G of the CEQA Guidelines. Consultant shall utilize the latest version of the Appendix G Checklist.

Consultant shall utilize information provided by the City and/or the project team, as well as pertinent City documents, including but not limited to the City of Pittsburg 2040 General Plan and associated EIR, and any other pertinent information prepared for the project site and surrounding area.

Consultant shall review the project for consistency with circulation planning documents and make a conclusion based on CEQA criteria.

Consultant shall complete the following deliverables:
• Submit one electronic copy of the Administrative Draft IS checklist to the City for review.

Task 5.1 Mitigated Negative Declaration (Option Analysis)

Consultant shall conduct additional analyses to determine if potentially significant environmental impacts can be reduced to a less-than-significant level through mitigation measures. If potentially significant impacts may be reduced to a less- than-significant level, Consultant shall submit an Administrative Draft Initial Study/ Mitigated Negative Declaration (IS/MND) checklist. If after the review of the Administrative Draft IS/MND, the City directs Consultant to process an IS/MND instead of an EIR, Consultant shall propose to amend the scope of work to reflect the IS/MND process at that time.

Consultant shall complete the following deliverables if determined necessary:
• Submit one electronic copy of the Administrative Draft IS/MND checklist to the City for review.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 77 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 4 of 17

Task 6 Prepare Notice of Preparation (NOP)

Consultant shall prepare/distribute an NOP for public review that includes a description of the proposed project, location map, and general environmental effects anticipated to be caused by the proposed project, as well as attend a public scoping meeting to solicit the public’s input on the content of the EIR.

Consultant shall revise the Administrative Draft IS alongside revisions to the NOP.

Both documents shall be revised based on City comments before final versions are submitted.

If during the NOP public review period, a substantial number of comments are received on a topic that would otherwise be addressed and dismissed in the IS, Consultant shall consult with the City to discuss whether the scope of services for the EIR should be revised to include additional technical chapters or technical analysis of additional topics. If additional chapters or technical analysis are deemed necessary by City staff, Consultant shall propose to amend the scope of work, schedule, and budget accordingly.

Consultant shall complete the following deliverables:
• Submit electronic copies of the Administrative Draft NOP with Screenscheck Draft IS attached to City staff for review;
• Submit electronic copies of the Final NOP with edits from the City incorporated and Final IS attached to the City;
• Coordinate with the City to publish, post, and distribute the NOP and electronically submit the NOP with a completed Notice of Completion (NOC) to CEQAnet and the State Clearinghouse;
• Facilitate and attend one public scoping meeting to emphasize the review process as well as the intent and requirements of CEQA as outlined in Task 16 Project Management, Meetings, and Hearings;
• Prepare a summary of the NOP scoping meeting, including all public comments;
• Revise the scope of services for the EIR if needed based upon NOP verbal and written comments received during the NOP comment period.

Task 7 Prepare Administrative Draft EIR

Consultant shall prepare an accurate, thorough, and complete Administrative Draft EIR for the proposed project that shall provide a project-level analysis to evaluate the potential environmental effects associated with the proposed project. The Administrative Draft EIR shall include all statutory sections required by CEQA Sections 15120 through 15131 and provide the public and decision-makers with a thorough, legally defensible environmental analysis of the proposed project.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 78 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 5 of 17

Task 7.1 Introduction, Executive Summary, and Project Description

The Introduction shall cite the provisions of CEQA to which the proposed project is subject. This section shall identify the intended uses of the EIR, agencies that may rely upon the EIR, purpose of the EIR and statutory authority, summary of the scoping procedures, and a list of the NOP comment letters and concerns raised in the letters.

The EIR shall also include an Executive Summary chapter to briefly describe in text the impacts and mitigation measures. A summary table shall be included, consisting of a matrix of impacts and mitigation measures, with levels of significance of impacts before and after mitigation. The summary table shall include all mitigation measures applicable to the proposed project.

The Project Description chapter shall be consistent with the one developed in Task 4 Project Description.

Task 7.2 Introduction to Analysis

The Introduction to Analysis chapter of the EIR shall summarize all of the topics found to be less than significant (with or without mitigation) in the IS. Consultant shall summarize and include the conclusions of the IS in this chapter. The Introduction to Analysis chapter shall also include a description of the format for each technical chapter.

Task 7.3 Environmental Setting, Impacts, and Mitigation Measures

The environmental analysis for the proposed project is anticipated to focus on the following areas: Air Quality and GHG Emissions; Biological Resources; Cultural Resources/Tribal Cultural Resources; Geology and Soils; Hazards and Hazardous Materials; Hydrology and Water Quality; Noise; and Transportation. If additional environmental chapters are required following the preparation of the IS, Consultant shall coordinate with the City and amend the scope of work. Project alternatives and statutorily required sections shall also be included. Consultant shall refine issues if necessary based on the comments received during the NOP scoping process.

Consistent with CEQA, each environmental chapter shall include the following: an introduction; existing environmental setting; regulatory context; standards of significance; method of analysis; identification of environmental impacts; development of mitigation measures and monitoring strategies; level of significance after mitigation; cumulative impacts and mitigation measures; significant impacts; and effects not found to be significant. Consultant shall include the following technical environmental chapters:

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 79 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 6 of 17

a) Air Quality and GHG Emissions
Consultant shall undertake the air quality and GHG analysis utilizing the California Emissions Estimator Model (CalEEMod) software program and following the BAAD CEQA Guidelines.

Air Quality
The air quality impact analysis shall include a quantitative assessment of short-term (i.e., construction) increases of criteria air pollutant emissions of primary concern (i.e., ROG, NOX, and PM10). Consultant shall additionally address toxic air contaminant (TAC) emissions using the California Air Resource Board (CARB) “Air Quality and Land Use Handbook: A Community Health Perspective.” The project’s cumulative contribution to regional air quality shall be discussed, based in part on the modeling conducted at the project level. The significance of air quality impacts shall be determined in comparison to the BAAD’s significance thresholds.

GHG Emissions
Consultant shall run the CalEEMod program, to produce an estimate of construction GHG emissions for the proposed project. Consultant shall use the VMT information from the Traffic Study to be prepared by Fehr and Peers to discuss any changes related to regional GHG emissions.

Consultant shall work closely with the City and BAAD throughout preparation of the GHG analysis with respect to identifying the methodology and thresholds of significance to be used for the GHG analysis. Consultant’s GHG analysis for the proposed project shall follow the agreed upon methodology and thresholds. Mitigation measures shall be identified, as appropriate, in coordination with the City and BAAD to identify feasible mitigations for GHG emissions. Consultant shall utilize the City’s Climate Adaptation Strategy and Greenhouse Gas Inventory as applicable.

b) Biological Resources
The Biological Resources chapter shall summarize potential effects to plant communities, wildlife, and wetlands, including adverse effects on rare, endangered, candidate, sensitive, and special-status species, from the development of the proposed project. Consultant shall rely on the Biological Resources Assessment and Wetland Delineation Report.

Biological Resources Analysis
Consultant itself or by subconsultant approved by City shall review the CDFW’s Natural Diversity Data Base for records of special- status plant and animal species known from the project site and within 5 miles of the project site; conduct a site survey to confirm project site plant communities and wildlife habitats; prepare a characterization of the project site including a discussion of the project site’s plant communities and wildlife habitats; evaluate and Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 80 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 7 of 17

discuss the potential presence of special-status plant and animal species and/or their habitats on the project site; develop mitigation measures, if necessary; and prepare a report.

Wetland Delineation Report
Consultant shall map the areas that would likely constitute “waters of the United States” (i.e., those areas that would likely be regulated by the Corps) using satellite (GPS) technology; examine the soils and plant species composition on the project site; prepare an Aquatic Resources Delineation Report to submit to USACE with a request to conduct a formal Aquatic Resources Delineation Determination; perform a site visit with USACE to verify mapped wetlands; and resubmit final wetlands map to USACE, if necessary, to request a final map concurrence.

c) Cultural Resources/Tribal Cultural Resources
The Cultural Resources portion of the chapter shall include a summary of the setting and briefly describe the potential effects to any on-site historical and/or archaeological resources due to implementation of the proposed project.

Consultant shall rely on the Cultural Resources Study to be prepared by EBA.

EBA shall conduct archival research to assess the potential for prehistoric and historic-era cultural resources within the study area and its surroundings; contact the Native American Heritage Commission (NAHC) for a Sacred Lands File search; conduct a field study of the project site; and prepare a written technical report.

The Tribal Cultural Resources portion of the chapter shall include a summary of the setting and briefly describe the potential effects to any on-site tribal cultural resources due to implementation of the proposed project.

d) Geology and Soils
The Geology and Soils chapter shall include a summary of the setting and describe the potential effects from soil erosion, earthquakes, liquefaction, and expansive/unstable soils, as well as identify any paleontological resources or unique geological features within the project area. Consultant shall rely on the City-provided Preliminary Geotechnical Report. Consultant shall incorporate the results of the analysis into the Geology and Soils chapter of the EIR.

e) Hazards and Hazardous Materials
The Hazards and Hazardous Materials chapter shall include a summary of the setting and describe any potential for existing or possible hazardous materials within the project area. Consultant shall rely on the Phase I ESA.

Consultant shall perform the following::
• Review available environmental documents;
• Review publicly available and practically reviewable standard local, state, tribal, and federal environmental record sources to evaluate hazardous Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 81 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 8 of 17

materials information regarding the project site and nearby sites; • Review publicly available practically reviewable standard historical sources, aerial photographs, Sanborn Fire Insurance Maps, and physical setting sources for the history of development at and near the project site; • Perform a site visit to observe site use and current conditions, check for evidence of potential environmental conditions, and check for the storage, use, production, or disposal of hazardous or potentially hazardous materials; • Conduct written or oral interviews with present and/or past owners, operators, and/or occupants of the project site and governmental officials; • Prepare a report including findings, opinions, and conclusions regarding potential Recognized Environmental Conditions (RECs).

f) Hydrology and Water Quality
The Hydrology and Water Quality chapter shall include a summary of the setting information and identify potential project impacts on storm water drainage, flooding, groundwater, and water quality. Consultant shall utilizeCity Hydrology/Drainage Report.

The Hydrology and Water Quality chapter shall also include a discussion of the potential for the proposed project to adversely affect surface water quality, and identify any improvements designed in accordance with state and local standards to minimize impacts to water quality. Consultant shall incorporate the results of the analysis into the Hydrology and Water Quality chapter of the EIR.

g) Noise
The Noise chapter shall include a summary of the setting information and identify potential noise impacts associated with construction and operation of the proposed project. Consultant conduct a Noise/Vibration Analysis from a continuous (24-hr) and short-term (10-15 min) noise level measurement at representative sensitive receptors along the project route; analyze existing, future no-project, and future plus project traffic noise levels; and prepare a report including noise abatement measures, if required.

h) Transportation
The Transportation chapter shall include a description of the potential impacts related to VMT; pedestrian, bicycle, and transit facilities; and safety due to implementation of the proposed project. Consultant shall rely on the transportation assessment, including VMT assessment, to be prepared by Fehr and Peers. Fehr and Peer shall also prepare traffic volumes for use in the air quality and noise analyses and an Intersection Level of Service (LOS) Analysis. For a full scope of work, see Appendix G.

VMT Assessment
Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 82 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 9 of 17

Consultant shall assess the proposed project’s effects on VMT by evaluating Baseline Conditions, Baseline plus Project Conditions, Cumulative No Project Conditions, and Cumulative plus Project Conditions, and identify appropriate mitigation measures, if necessary.

Traffic Volumes
Consultant shall collect data of peak hour traffic volumes at three intersections; assess the amount of diverted traffic forecasted to the roadway; and calculate peak-hour intersection volumes for Existing Conditions, Existing plus Project Conditions, Cumulative Conditions (Year 2040), and Cumulative plus Project Conditions.

Intersection LOS Analysis
Consultant shall assess the roadway’s operational performance under the existing and cumulative conditions with and without the proposed widening.

This analysis shall include an assessment of peak hour levels of service (LOS).

Consultant shall coordinate with the City’s Public Works Department to ensure the adequacy of the provided reports and to confirm all CEQA issues have been adequately and accurately addressed. Consultant shall incorporate the results of the analysis into the Transportation chapter of the EIR.

Task 7.4 Statutorily Required Sections

The Statutorily Required Sections chapter of the EIR shall summarize significant and unavoidable, significant irreversible, and growth-inducing impacts, to the extent that such impacts are identified in the EIR analysis. The chapter shall also summarize the cumulative impact analyses, which shall be provided in each technical chapter of the EIR.

Task 7.5 Alternatives to the Proposed Project

The EIR shall include an alternatives analysis in compliance with CEQA Guidelines Section 15126.6. The Alternatives chapter shall evaluate three to five alternatives, including a No Project Alternative, as required by CEQA. Alternatives shall be selected when more information related to project impacts is available in order for the alternatives to be designed to reduce significant project impacts.

Alternatives shall be developed in consultation with the City staff during preparation of the Administrative Draft EIR to respond to identified significant impacts.

The Alternatives chapter shall describe the project alternatives and identify the environmentally superior alternative. The alternatives shall be analyzed at a level Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 83 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 10 of 17

of detail less than that of the proposed project which is permissible under CEQA; however, the analyses shall include sufficient detail to allow a meaningful comparison of the impacts. The Alternatives chapter shall include a qualitative- level analysis of all impacts for the alternatives and a section for alternatives considered but dismissed. A matrix comparing the impacts of the proposed project to the alternatives shall also be included.

Consultant shall complete the following deliverables:
• Submit electronic copies of the Administrative Draft EIR to City staff to review for adequacy and accuracy.

Task 8 Prepare Screencheck Draft EIR

The objective of this task is to edit the Administrative Draft EIR, based on comments received from the City’s review, to prepare a Screencheck Draft EIR.

Consultant assumes comments shall be in a consolidated set and shall not require additional technical analysis. Consultant shall provide the Screencheck Draft EIR to the City in track-changes format.

Consultant shall complete the following deliverables:
• Attend conference calls, as needed, with City staff to discuss City comments on the Administrative Draft EIR; and
• Submit electronic copies of the Screencheck Draft EIR to the City of Pittsburg.

Task 9 Prepare Public Review Draft EIR

Consultant shall edit the Screencheck Draft EIR, based on any additional comments received, and prepare and distribute the Public Review Draft EIR for the 45-day public review period in accordance with CEQA requirements.

Consultant assumes that the revisions from additional comments on the Screencheck Draft EIR shall only require editorial or other non-substantive changes. Consultant shall prepare the Notice of Availability (NOA) of the Public Review Draft EIR and shall coordinate with the City of Pittsburg to publish the NOA in the newspaper, distribute to responsible agencies, and post at the County Clerk’s Office. Consultant shall electronically submit the NOC, State Clearinghouse Summary Form (Summary Form F), and the Draft EIR to CEQAnet and the State Clearinghouse.

Consultant shall complete the following deliverables:
• Submit electronic copies of the Public Review Draft EIR to the City of Pittsburg;
• Submit a hardcopy of the Public Review Draft EIR with the appendices on a flashdrive adhered to the back cover, and one hardcopy of the appendices to the City of Pittsburg;
Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 84 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 11 of 17

• Prepare the NOA, NOC, and Summary Form F;
• Coordinate with the City of Pittsburg to perform the necessary posting, noticing, and distribution of the Public Review Draft EIR; and • Electronically submit the NOC, Summary Form F, and Public Review Draft EIR to CEQAnet and the State Clearinghouse.

Task 10 Prepare Administrative Final EIR

Consultant shall respond to all comments received during the 45-day public review period and compile the comments into an Administrative Final EIR for review by the City of Pittsburg. Consultant assumes these comments shall not raise new issues, or that new surveys or technical studies shall be required to complete adequate responses. Consultant assumes that the amount and nature of responses can be addressed within the hours shown in the compensation chart

Consultant shall prepare responses to up to 150 individual comments that are substantive in nature. Repetitive comments shall not count toward this total. For example, it is not uncommon for the public to submit a large volume of comments on a particular issue/concern. In such a case, Consultant shall prepare a master response to address the thematic concern; and this effort would only constitute one response. Should more time or technical analyses be needed to respond to additional comment letters, Consultant shall initiate discussions immediately with City staff to conduct this extra work. The Final EIR shall consist of the following chapters: Introduction; List of Commenters; Responses to Comments; revisions to the Draft EIR text as a result of comments; and Mitigation Monitoring and Reporting Program (see Task 11).

Consultant shall complete the following deliverables:
• Meet with City staff to review all comments received and determine the appropriate written responses to the comments, as outlined in Task 16 Project Management, Meetings, and Hearings; and
• Submit electronic copies of the Administrative Final EIR.

Task 11 Prepare Mitigation Monitoring and Reporting Program (MMRP)

Consultant shall prepare an MMRP for the City of Pittsburg to be incorporated into the Final EIR. Consultant shall prepare an MMRP to comply with Public Resources Code Section 21081.6, which shall include, but not be limited to actions identified in the EIR, as well as methods of implementation.

Consultant shall complete the following deliverables:
• Submit electronic copies of the draft MMRP to the City of Pittsburg within the Administrative Final EIR; and
• Submit electronic copies of the final MMRP to the City of Pittsburg within the Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 85 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 12 of 17

Final EIR.

Task 12 Prepare Screencheck Final EIR

Consultant shall revise the Administrative Final EIR in in track changes format based on City comments received and prepare a Screencheck Final EIR.

Consultant shall complete the following deliverables:
• Conversations with City staff to discuss City comments and revisions to the Administrative Final EIR; and
• Submit electronic copies of the Screencheck Final EIR to the City of Pittsburg (with City edits incorporated).

Task 13 Prepare Final EIR

Consultant shall revise the Screencheck Final EIR, based on any additional comments from the City of Pittsburg, in order to provide a thorough, responsive Final EIR. Consultant assumes edits shall only require editorial or other non- substantive changes to the Screencheck Final EIR.

Consultant shall complete the following deliverables:
• Submit electronic copies of the Final EIR to the City of Pittsburg; • Submit a hardcopy, with appendices on a flashdrive in the back cover, if applicable, to the City of Pittsburg; and
• Coordinate with the City of Pittsburg to prepare all required noticing.

Task 14 Prepare Findings of Fact and Statement of Overriding Considerations and Notice of Determination

Consultant shall prepare the required Findings of Fact/Statement of Overriding Considerations (FOF/SOC), pursuant to CEQA, that incorporate information regarding the project’s environmental impacts disclosed in the EIR, and prepare a Notice of Determination (NOD) should the project be approved. Consultant shall prepare FOF/SOC pursuant to CEQA Guidelines Section 15091 to provide the appropriate language to dismiss the project alternatives not selected, as well as language on the overriding considerations, if necessary, to describe the benefits of the project that may outweigh any adverse environmental effects. Information from the fiscal impact analysis shall also be utilized for this purpose.

Consultant shall complete the following deliverables:
• Submit electronic copies of the administrative draft FOF/SOC to City staff for the City Attorney to review;
• Submit electronic copies of the screencheck FOF/SOC with revisions made based upon comments from the City Attorney;
Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 86 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 13 of 17

• Submit electronic copies of the final FOF/SOC to City staff with the Final EIR; and
• Prepare an NOD for City filing at the County Clerk Recorder’s Office and posting on CEQAnet and at the State Clearinghouse, should the project be approved.

Task 15 Prepare Staff Reports, Findings for Approvals, Ordinances, and Resolutions

Consultant shall describe the proposed project and required conditions of approval, and prepare the necessary staff reports for Planning Commission and City Council hearings, including the conditions of approval, ordinances, and resolutions. Consultant shall submit the draft staff reports to the City and shall revise the staff reports, as needed, based on the City’s comments.

Consultant shall complete the following deliverables:
• Prepare staff reports in the standard City format that contain all required findings, ordinances, conditions of approval, and resolutions; • Submit one electronic copy of the draft staff reports including findings, conditions of approval, ordinances, and resolutions for the Planning Commission and City Council hearings for City review and comments; • Revise the draft Planning Commission and City Council staff reports based on City comments; and
• Submit one electronic copy of the final staff reports including findings, ordinances, conditions of approval, and resolutions for the Planning Commission and City Council hearings.

Task 16 Project Management, Meetings, and Hearings Consultant shall attend meetings during the environmental review process, and ensure close, extensive coordination and interaction with City staff, the project team, technical sub- consultants, and the public. The Consultant project management team, identified in Task 1 Project Initiation, shall be responsible for coordination with City staff and technical consultants, handling the day-to-day activities of the EIR preparation and responding to staff inquiries about the EIR and process.

Consultant shall complete the following deliverables:
• Project Management from Vice President/Air Quality Specialist Rod Stinson serving as Project Director, and Vice President/Air Quality Specialist Angela DaRosa serving as Project Manager;
• Project support from President Tim Raney, AICP; Vice President Nick Pappani; and Associate and Administrative staff;
• Regular phone and e-mail communications with City staff, project stakeholders, and pertinent City, state, and local agencies throughout the process;
Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 87 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 14 of 17

• Prepare any necessary materials and/or presentations prior to the meetings, and answer questions and respond to comments as needed; • Attendance at up to 10 in-progress meetings with City staff; • Provide staff support during public and staff meetings as needed; • Conduct all Responsible Agency consultation;
• Facilitate and attend one NOP public scoping meeting to emphasize the review process as well as the intent and requirements of CEQA; • Attendance at one working meeting with City staff to discuss internal comments on the Administrative Draft EIR;
• Attendance at one meeting with City staff to discuss comments received on the Public Review Draft EIR;
• Attendance at up to four public hearings, including Planning Commission and City Council public hearings; and
• Additional meetings and hearings can easily be accommodated upon request and would be billed on a time-and-materials basis following Consultant’s standard billing rates.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 88 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 15 of 17

EXHIBIT B

COMPENSATION SCHEDULE

For completion of the tasks set forth in the scope of work, Consultant shall be paid in an amount not to exceed Three Hundred Seventy-Four Thousand Two Hundred Thirteen Dollars ($374,213).

PROPOSED COST ESTIMATE
West Leland Road Extension Phase II Project EIR

Project Director

Project Manager

Air Quality Specialist

Air Quality Technician

Senior Planner

Senior Associate

Associate

Cost Per Task
Task 1 Project Initiation 4 4 3 $ 1,945
Task 2 Peer Review of City-Provided Reports 10 10 $ 3,700 Task 3 Agency Consultation and Resource Agency Permitting 2 24 9 20 $ 8,685 Task 4 Project Description 2 4 5 18 $ 4,295
Task 5 Prepare Initial Study 2 2 6 44 $ 7,610
Task 5.1 Mitigated Negative Declaration (Option Analysis) 1 2 4 6 $ 1,975 Task 6 Prepare NOP 4 8 12 18 $ 6,470
Task 7 Prepare Administrative Draft EIR 12 12 14 20 $ 9,310 Technical Sections
Task 7.1 Introduction, Executive Summary, and Project Description 2 5 4 16 $ 4,045 Task 7.2 Introduction to Analysis 1 2 4 16 $ 3,325
Task 7.3 Environmental Setting, Impacts, Mitigation Measures a Air Quality & GHG Emissions (including Energy) 5 6 6 38 $ 8,085 a.1 AQ/GHG Technical Analysis 6 12 $ 2,910
b Biological Resources 5 6 6 38 $ 8,085
c Cultural Resources/Tribal Cultural Resources 4 5 5 34 $ 7,020 d Geology and Soils 4 5 5 34 $ 7,020
e Hazards and Hazardous Materials 4 5 5 34 $ 7,020
f Hydrology and Water Quality 5 6 6 38 $ 8,085
g Noise 5 6 6 34 $ 7,545
h Transportation 5 5 5 36 $ 7,485
Other Sections
Task 7.4 Statutorily Required Sections 2 4 4 16 $ 3,870 Task 7.5 Alternatives 4 7 6 36 $ 7,795
Task 8 Prepare Screencheck Draft EIR 4 5 8 32 $ 7,215 Task 9 Prepare Public Review Draft EIR (includes public hearing) 4 4 6 12 $ 4,030 Task 10 Prepare Administrative Final EIR 7 14 22 45 $ 13,300 Task 11 Prepare MMRP 1 3 2 8 $ 2,110
Task 12 Prepare Screencheck Final EIR 4 5 6 18 $ 5,015 Task 13 Prepare Final EIR 1 3 5 12 $ 3,115
Task 14 Prepare FOF/SOC and NOD 3 5 6 20 $ 5,090

Task 15
Prepare Staff Reports, Findings of Approvals,
Ordinances, and Resolutions

20 18

$ 5,530
Task 16 Project Management, Meetings, and Hearings 42 86 20 $ 26,340

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 89 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 16 of 17

PROPOSED COST ESTIMATE
West Leland Road Extension Phase II Project EIR

Project Director

Project Manager

Air Quality Specialist

Air Quality Technician

Senior Planner

Senior Associate

Associate

Cost Per Task
Total Hours 149 253 6 12 20 190 661
Hourly Rate $ 195 $ 175 $ 175 $ 155 $ 155 $ 155 $ 135
Total EIR Labor $ 29,055 $ 44,275 $ 1,050 $ 1,860 $ 3,100 $ 29,450 $ 89,235 $ 198,025

Expenses $ 176,188
Copying/Printing/Travel/Postage/Etc.* $ 3,000
Sub-Consultant: Monk & Associates $ 23,794
Monk & Associates: Resource Agency Permitting $ 29,246 Sub-Consultant: Eileen Barrow and Associates $ 4,320 Sub-Consultant: ENGEO $ 19,500
Sub-Consultant: West Yost $ 16,468
Sub-Consultant: Saxelby Acoustics $ 10,280
Sub-Consultant: Fehr & Peers $ 61,190
5% Administrative Fee (Sub-Consultant Markup) $ 8,390

Total Budget $ 374,213
* Estimate only, To Be Billed at Cost

The above rates include all applicable calculations for fringe benefits, overhead, and profit. No additional charges shall be applied for overhead, profit, or any other labor- related costs. These rates shall remain valid for the full duration of the Agreement.

Mileage shall be reimbursed at the current IRS standard rate, as adjusted per IRS guidelines. This rate excludes toll charges. Reimbursable Expenses are separate from the agreed hourly fees and include actual costs incurred by the consultant in support of the project. Such expenses may include postage, reproduction, drawing plotting, printing, and special materials or equipment required for deliverables to the city. Printing and reprographics for the consultant’s internal use are not reimbursable.

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 90 of 178 ends

Consulting Services Agreement between October 7, 2025
City of Pittsburg and Raney Planning & Management, Inc. Page 17 of 17

CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

RANEY PLANNING & MANAGEMENT, INC.

By:

Title: Vice President/Air Quality Specialist

Docusign Envelope ID: 94EF4FA7-F402-41DA-82EE-D17B72DDA052

Page 91 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor and Council Members

FROM: Maria M. Aliotti - Interim City Manager

SUBJECT: Adoption of a City Council Resolution Authorizing Execution of the First Amendment to the General Services Agreement with Operational Technical Services for Specialty Temporary Staffing Services at the Water Treatment Plant

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

The Water Treatment Plant has two vacant positions in the Water Quality Lab. The City entered into a General Services Agreement (Agreement) with Operational Technical Services (OTS) for specialty temporary staffing services and needs to execute a First Amendment to increase the compensation to extend the services while regular staff recruitment is completed.

FISCAL IMPACT
The First Amendment will increase the Agreement amount by $50,000 for a total not to exceed amount of $100,000. There are sufficient funds in the Water Treatment Plant’s operating budget.

RECOMMENDATION
The City Council adopt the attached Resolution authorizing execution of the First Amendment to the General Services Agreement with Operational Technical Services for specialty temporary staffing services at the Water Treatment Plant.

BACKGROUND
On March 10, 2025, the City entered into an Agreement with OTS for specialty temporary staffing services.

Page 92 of 178 ends

SUBCOMMITTEE FINDINGS
This item was not presented to a subcommittee.

STAFF ANALYSIS
The Water Treatment Plant produces high quality drinking water for the community.

One of their required functions is to regularly treat the water to ensure it meets State requirements for consumption by the public. With both the Water Quality Lab Supervisor and Water Quality Analyst positions currently vacant, it was essential that the City find an alternative means for testing the water while recruitments efforts are ongoing. OTS specializes in providing staffing services for water and sewer utilities.

This Agreement has allowed the City to have qualified staff continue the work of regularly testing the water to ensure it meets all regulatory requirements. This Amendment will allow these services to continue long enough for the City to complete the recruitment for these positions.

Attachments: Resolution
First Amendment
General Services Agreement

Report Prepared By: Sharon Paz, Administrative Analyst II

Page 93 of 178 ends

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing Execution of the First Amendment)
To the General Services Agreement with )
Operational Technical Services for Specialty ) RESOLUTION NO. 25- Temporary Staffing Services at the Water )
Treatment Plant )

WHEREAS, due to the vacancy of the Water Quality Lab Supervisor and Water Quality Analyst positions at the Water Treatment Plant, the City is currently recruiting for these positions; and

WHEREAS, on March 10, 2025, the City entered into a General Services Agreement with Operational Technical Services for specialty temporary staffing services; and

WHEREAS, until the recruitment process is completed, additional services are needed, which require an increase to the compensation by $50,000, bringing the total maximum compensation to $100,000; and

WHEREAS, there are sufficient funds in the Water Treatment Plant’s operating budget for this expense.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pittsburg hereby authorizes the City Manager to execute the First Amendment to the General Services Agreement with Operational Technical Services.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor
ATTEST BY:

Alice E. Evenson, City Clerk

Page 94 of 178 ends

FIRST AMENDMENT TO

GENERAL SERVICES AGREEMENT BETWEEN

CITY OF PITTSBURG AND
OPERATIONAL TECHNICAL SERVICES, LLC.

THIS First Amendment to the Principal Agreement made and entered into on September 12, 2025, hereafter referred to as Agreement, between Operational Technical Services, a California limited liability company, therein referred to as Consultant, and the City of Pittsburg, a municipal corporation, therein referred to as City, is made and entered into on this 7th day of October, 2025.

WHEREAS, the parties entered into an Agreement for specialty temporary staffing services at the Water Treatment Plant; and

WHEREAS, the parties desire to increase the compensation.

NOW, THEREFORE, Consultant and City do mutually agree as follows:

1. Compensation. Section 2 of the Agreement is hereby amended to read as follows:

City hereby agrees to pay Consultant a sum not to exceed One Hundred Thousand Dollars ($100,000) for services to be performed and reimbursable expenses incurred under this Agreement. This dollar amount is not a guarantee that the City will pay that full amount to the Consultant but is merely a limit of potential City expenditures under this Agreement.

2. Integration. This First Amendment contains the entire agreement between the parties with respect to its subject matter and supersedes whatever oral or written understanding they may have had prior to the execution of this First Amendment. This First Amendment shall not be amended or modified except by a written agreement executed by each of the parties. Except as specifically revised herein, all terms and conditions of the Agreement shall remain in full force and effect, and Consultant shall perform all duties, obligations and conditions required under the Agreement.

3. Inconsistencies. In the event of any conflict or inconsistency between the provisions of this First Amendment and the Agreement, the provisions of this First Amendment shall control in all respects.

4. Ambiguities. The parties have each carefully reviewed this First Amendment and have agreed to each term of this First Amendment. No ambiguity shall be presumed to be construed against either party.

5. Counterparts. This First Amendment may be executed by the parties in one or more counterparts all of which collectively shall constitute one document and agreement.

Docusign Envelope ID: 0AEF2D65-EC56-4923-A881-718284DD40A7

Page 95 of 178 ends

6. Authority. The person signing this First Amendment for Consultant hereby represents and warrants that he or she is fully authorized to sign this First Amendment on behalf of Consultant.

IN WITNESS WHEREOF, the parties have entered into this First Amendment on the day and year first hereinabove appearing.

CONSULTANT:

OPERATIONAL TECHNICAL SERVICES, a
limited liability company

By:

David Sibelman, Chief Executive Officer

CITY:

CITY OF PITTSBURG, a municipal
corporation of the State of California

By:

Maria Aliotti, Interim City Manager

APPROVED AS TO FORM:

By:

Donna Mooney, City Attorney

Docusign Envelope ID: 0AEF2D65-EC56-4923-A881-718284DD40A7

Page 96 of 178 ends
Page 97 of 178 ends
Page 98 of 178 ends
Page 99 of 178 ends
Page 100 of 178 ends
Page 101 of 178 ends
Page 102 of 178 ends
Page 103 of 178 ends
Page 104 of 178 ends
Page 105 of 178 ends
Page 106 of 178 ends
Page 107 of 178 ends
Page 108 of 178 ends
Page 109 of 178 ends
Page 110 of 178 ends
Page 111 of 178 ends
Page 112 of 178 ends
Page 113 of 178 ends
Page 114 of 178 ends
Page 115 of 178 ends
Page 116 of 178 ends
Page 117 of 178 ends
Page 118 of 178 ends
Page 119 of 178 ends
Page 120 of 178 ends
Page 121 of 178 ends
Page 122 of 178 ends
Page 123 of 178 ends
Page 124 of 178 ends
Page 125 of 178 ends
Page 126 of 178 ends
Page 127 of 178 ends
Page 128 of 178 ends
Page 129 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor and Council Members

FROM: Maria M. Aliotti - Interim City Manager

SUBJECT: Adoption of a City Council Resolution Authorizing the City Manager to Execute the First Amendment to the Agreement for Services with Cinquini and Passarino, Inc. for Enhanced Infrastructure Financing District Legal Map and Description Services and Allocating Funds

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

The Enhanced Infrastructure Financing District (EIFD) formation process requires the creation of a legal map and description of the parcels that will comprise the district. In January 2025, the City entered into an agreement with Cinquini and Passarino, Inc. ("Consultant") to provide these services (the "Agreement"). The Consultant has completed these services and delivered a complete set of signed documents, which will be used for filing the approved district with the State Board of Equalization (BOE). Due to unforeseen additional research required to prepare the documents, an amendment to the Agreement to increase the total compensation by $16,954 (the "First Amendment") is proposed.

FISCAL IMPACT

The proposed First Amendment would increase the total compensation of the Agreement by $16,954, to a total of $91,534. The previous compensation limit of $74,580 has been expended for services rendered under the Agreement. The additional costs for services rendered will be paid using Economic Development funds, the same funding source for the original Agreement.

Page 130 of 178 ends

RECOMMENDATION

City Council adopt the attached resolution authorizing the City Manager to execute the First Amendment to the Agreement with Cinquini and Passarino, Inc. for Enhanced Infrastructure Financing District Legal Map and Description Services and allocating funds.

BACKGROUND

On January 21, 2025, the City entered into an Agreement with the Consultant to create legal maps and descriptions of the geographic areas within the Pittsburg EIFD in accordance with State Board of Equalization standards. These legal maps and descriptions are required to be incorporated within the Infrastructure Financing Plan (IFP) of an EIFD under Section 53398.63 of the California Government Code. The Consultant conducted extensive research and collaborated with City staff to deliver a total of 53 geographic area maps and descriptions that make up the Pittsburg EIFD in early July. These maps and descriptions were incorporated into the draft IFP that was adopted by the Pittsburg EIFD Public Financing Authority on July 21, 2025. Staff is now in the process of filing with the State BOE to finalize establishment and begin collections of receipts from the Pittsburg EIFD.

SUBCOMMITTEE FINDINGS

This item was not presented to any subcommittee.

STAFF ANALYSIS

Due to unforeseen efforts required to prepare the legal maps and description as a result of the age of certain deed documents and/or deed documents being associated with lot line adjustments, more extensive research than was previously anticipated was required by the Consultant. In a letter dated August 18, 2025, the Consultant provided information stating that their project budget of $74,580 was exceeded, and requested an additional $16,954 to cover costs for this additional research and analysis. Completion of the legal maps and descriptions is essential to the task of forming the Pittsburg EIFD.

ATTACHMENTS: Resolution
First Amendment

Report Prepared By: Robert Hicks-Carrera, Economic Development Manager

Page 131 of 178 ends

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing Execution of the First Amendment )
To the Consulting Services Agreement with ) RESOLUTION NO. 25- Cinquini & Passarino, Inc. and Allocating Funds)

WHEREAS, the City of Pittsburg entered into a Consulting Services Agreement ("Agreement") with Cinquini & Passarino, Inc. (“Consultant”) on January 21, 2025, to draft, sign, and stamp legal maps and descriptions for the Pittsburg Enhanced Infrastructure Financing District (EIFD); and

WHEREAS, the Consultant successfully completed the scope of services in early July 2025, and delivered to the City 53 geographic areas with legal maps and descriptions for each area within the Pittsburg EIFD; and

WHEREAS, these legal maps and descriptions were incorporated into the final draft Infrastructure Financing Plan of the Pittsburg EIFD approved by the Pittsburg EIFD Public Financing Authority on July 21, 2025, thereby forming the Pittsburg EIFD; and

WHEREAS, in a letter dated August 18, 2025, to the City, the Consultant notified and provided detail that costs exceeded the project budget stated in the Agreement, and requested an additional $16,954 in compensation for services rendered.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pittsburg hereby authorizes the City Manager to execute the First Amendment to the Consultant Services Agreement with Cinquini and Passarino, Inc. and allocates the requisite funding.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor
ATTEST BY:

Alice E. Evenson, City Clerk

Page 132 of 178 ends

FIRST AMENDMENT TO

CONSULTING SERVICES AGREEMENT BETWEEN

CITY OF PITTSBURG AND
CINQUINI AND PASSARINO, INC.

THIS First Amendment to the Principal Agreement made and entered into on January 21, 2025, hereafter referred to as Agreement, between Cinquini and Passarino, Inc., a California corporation, therein referred to as Consultant, and the City of Pittsburg, a municipal corporation, therein referred to as City, is made and entered into on this 6 th day of October, 2025.

WHEREAS, the parties entered into an Agreement for Legal Map and Description services for the Pittsburg Enhanced Infrastructure Financing District; and

WHEREAS, the parties desire to increase the total compensation amount.

NOW, THEREFORE, Consultant and City do mutually agree as follows:

2. Compensation. Section 2 of the Agreement is hereby amended to read as follows:

City hereby agrees to pay Consultant a sum not to exceed Ninety One Thousand, Five Hundred and Thirty-Three Dollars and Fifty Cents ($91,533.50), as set forth in Exhibit B, attached hereto and incorporated herein for services to be performed and reimbursable expenses incurred under this Agreement. This dollar amount is not a guarantee that the City will pay that full amount to the Consultant, but is merely a limit of potential City expenditures under this Agreement.

4. Exhibit B Compensation Schedule. Exhibit B is hereby replaced with Attachment 1 of this First Amendment.

5. Integration. This First Amendment contains the entire agreement between the parties with respect to its subject matter and supersedes whatever oral or written understanding they may have had prior to the execution of this First Amendment. This First Amendment shall not be amended or modified except by a written agreement executed by each of the parties. Except as specifically revised herein, all terms and conditions of the Agreement shall remain in full force and effect, and Consultant shall perform all duties, obligations and conditions required under the Agreement.

6. Inconsistencies. In the event of any conflict or inconsistency between the provisions of this First Amendment and the Agreement, the provisions of this First Amendment shall control in all respects.

7. Ambiguities. The parties have each carefully reviewed this First Amendment and have agreed to each term of this First Amendment. No ambiguity shall be presumed to be construed against either party.

8. Counterparts. This First Amendment may be executed by the parties in one or

Page 133 of 178 ends

more counterparts all of which collectively shall constitute one document and agreement.

9. Authority. The person signing this First Amendment for Consultant hereby represents and warrants that he or she is fully authorized to sign this First Amendment on behalf of Consultant.

IN WITNESS WHEREOF, the parties have entered into this First Amendment on the day and year first hereinabove appearing.

CONSULTANT:

CINQUINI AND PASSARINO, INC., a
corporation

By:

Anthony G. Cinquini, PLS, Principal

CITY:

CITY OF PITTSBURG, a municipal
corporation of the State of California

By:

Maria M. Aliotti, Interim City Manager

APPROVED AS TO FORM:

By:

Donna Mooney, City Attorney

Page 134 of 178 ends

ATTACHMENT [1]

EXHIBIT B

COMPENSATION SCHEDULE
Total project costs for this agreement shall not exceed $91,533.50. Services will be rendered on an hourly basis and invoiced monthly.

Page 135 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor and Council Members

FROM: Maria M. Aliotti - Interim City Manager

SUBJECT: Adoption of a City Council Resolution Accepting Project 2227 – Traffic Signal Improvements as Complete and Authorizing the City Engineer to File a Notice of Completion

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

Project 2227 – Traffic Signal Improvement (Project) upgraded traffic signal hardware at 35 signalized intersections throughout the City. This resolution will accept the project as complete and authorize the City Engineer to file a Notice of Completion.

FISCAL IMPACT

The Project was funded by $1,065,600 from the Highway Safety Improvement Program (HSIP) grant, $44,400 from the Road Maintenance Rehabilitation Account (RMRA - Fund 228), and $161,000 from the General Fund (Fund 110) for a total approved budget of $1,271,000. The total anticipated expenditure for the Project, including design, construction, and staff time costs is $1,162,521. Because other funds, such as grants, are utilized first, the unspent balance will be returned to the General Fund.

An updated CIP project sheet is attached to this report.

RECOMMENDATION

Staff recommends that the City Council adopt the attached Resolution accepting the Project as complete and authorizing the City Engineer to file a Notice of Completion.

Page 136 of 178 ends

BACKGROUND

On September 16, 2019, City Council adopted Resolution No. 19-13682, accepting a $1,065,600 HSIP grant, allocating $44,400 from RMRA, and establishing a total project budget in the amount of $1,110,000.

Advertising for the Project began on October 13, 2021 and construction bids were opened on November 17, 2021.

On January 18, 2022, City Council adopted Resolution No. 22-14041, allocating $161,000 from the General Fund, accepting the plans and specifications, and awarding a construction contract to the lowest responsive responsible bidder, Bear Electric Solutions in the amount of $803,879 for construction of the Project.

SUBCOMMITTEE FINDINGS

This item was not presented to a subcommittee.

STAFF ANALYSIS

The Project successfully upgraded traffic signal hardware at 35 signalized intersections throughout the City, significantly enhancing overall traffic safety, flow, and efficiency for drivers, pedestrians, and cyclists. This upgrade addresses key issues, including aging equipment, inconsistent signal timing, and limited integration with modern traffic management systems. The new hardware now better supports the City’s transportation network, ensuring more reliable operation, reduced congestion, and improved responsiveness to real-time traffic conditions.

During construction there were two contract change orders for the Project in the amount of $29,016.99 to account for a change in equipment to match City standard signal hardware.

ATTACHMENTS: Resolution
CIP Project Sheet

Report Prepared by: Tina Tan, Assistant Engineer

Page 137 of 178 ends

Resolution No. 25- Page 1 of 2 October 6, 2025

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Accepting Project 2227 – Traffic Signal )
Improvement as Complete and Authorizing ) RESOLUTION NO. 25- The City Engineer to File a Notice of Completion)

WHEREAS, Project 2227-Traffic Signal Improvement (Project) upgraded traffic signal hardware at 35 signalized intersections throughout the City; and

WHEREAS, on September 16, 2019, City Council adopted Resolution No. 19-13682, accepting a $1,065,600 Highway Safety Improvement Program (HSIP) grant, allocating $44,400 from the Road Maintenance Rehabilitation Account (RMRA - Fund 228), and establishing a total project budget in the amount of $1,110,000; and

WHEREAS, advertising for the Project began on October 13, 2021, and construction bids were opened on November 17, 2021; and

WHEREAS, on January 18, 2022, City Council adopted Resolution No. 22-14041, allocating $161,000 from the General Fund (Fund 110), accepting the plans and specifications, and awarding a construction contract to the lowest responsive responsible bidder, Bear Electric Solutions in the amount of $803,879 for construction of the Project; and

WHEREAS, during construction, there were two contract change orders in the amount of $29,016.99 to account for a change in equipment to match City standard signal hardware; and

WHEREAS, the total anticipated expenditure for the Project, including design, construction, and staff time costs is $1,162,521.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pittsburg hereby accepts the Project as complete and authorizes the City Engineer to file a Notice of Completion and file said document with the Office of the Recorder of the County of Contra Costa, State of California, within 10 days from the date hereof.

BE IT FURTHER RESOLVED that the CIty Council directs staff to return any unspent funds to the General Fund.

Page 138 of 178 ends

Resolution No. 25- Page 2 of 2 October 6, 2025

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor
ATTEST BY:

Alice E. Evenson, City Clerk

Page 139 of 178 ends

City of Pittsburg 2024/25 – 2028/29 Capital Improvement Program

Project Title: Project #:
(HSIP 9) Citywide Traffic Signal Improvements 2227

Description/Justification:

This project will improve the traffic signal hardware at 35 signalized intersections citywide. Improvements include, but is not limited to, the replacement and/or installation of signal heads, lenses, pedestrian heads, push buttons, visors, backplates, retroreflective borders, controllers, cabinets, battery backup systems, and modems as well as minor improvements to signal timing.

Supplemental Information:

Funding Sources: Local Highway Safety Improvement Program (HSIP) Cycle 9 Federal Funds.

See below for project locations:

PROJECT EXPENDITURES Prior 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 TOTAL 1101 Staff Time 31,850$ 2,010$ 10,340$ 1,000$ 45,200$ 2122 Design 126,625$ 126,625$
2281 Construction 118,365$ 594,500$ 196,750$ 41,645 951,260$ 2372 Administrative Overhead 31,065$ 1,750$ 7,201$ 1,000$ 41,016$ TOTAL 307,905$ 598,260$ 214,291$ 43,645$ 1,164,101$ PROJECT FUNDING Prior 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 TOTAL 110 General Fund 161,000$ 161,000$
Federal/State Funding 1,065,600$ 1,065,600$
228 44,400$ 44,400$
TOTAL 1,271,000$ 1,271,000$

PROJECT FINANCING CURRENT PROPOSED
RMRA
Project Category: Signal
Location: Citywide
Project Manager: K. Labao
Project Priority: 1A – Essential
Project Status: Completed
Est. Completion Date: 2025/26

Page 140 of 178 ends

OFFICE OF THE CITY MANAGER/EXECUTIVE DIRECTOR
65 Civic Avenue
Pittsburg, CA 94565

TO: Mayor and Council Members

FROM: Maria M. Aliotti - Interim City Manager

SUBJECT: Adoption of a City Council Resolution Authorizing the City Manager to Accept a Community Grant from the United
States Environmental Protection Agency and Enter into a Grant Agreement

MEETING DATE: October 6, 2025

EXECUTIVE SUMMARY

The City was selected for a $959,752 federal earmark through the House Appropriations Committee and is eligible for receipt of grant funds through the administering party, the United States Environmental Protection Agency (US EPA) under the Safe Drinking Water State Revolving Fund Community Grants Program. The grant-funded project will identify and install alternative power technology to supplement the energy consumption of the City’s Water Treatment Plant (WTP) with off-grid, less expensive energy.

FISCAL IMPACT

Due to the nature of the project, the City has applied for $120,000 to fund project design.

This portion of the earmark has been awarded on a reimbursement basis. Once designed, the City will modify its grant agreement with the US EPA to include construction costs up to the total earmarked amount of $959,752. There is no match requirement for this funding opportunity.

RECOMMENDATION

City Council adopt the Resolution authorizing the City Manager to accept US EPA Safe Drinking Water State Revolving Fund Community Grant Program funds and enter into a grant agreement.

Page 141 of 178 ends

BACKGROUND

The City of Pittsburg operates a WTP and purveys high quality drinking water to all Pittsburg residents and businesses. In 2024, the City was selected for a $959,752 federal earmark through the House Appropriations Committee and is eligible for receipt of grant funds administered by the US EPA under the Safe Drinking Water State Revolving Community Grants Program. The program provides a valuable source of federal funding for water infrastructure that complements the resources Congress provided in the 2022 Bipartisan Infrastructure Law and the annual appropriations process. The funding awarded to the City is intended to identify and install alternative off-grid power generation technology to meet the energy demand of the City’s WTP.

SUBCOMMITTEE FINDINGS

This item was introduced at the April 18, 2024 Finance Management Subcommittee in the monthly grants update.

STAFF ANALYSIS

The objective of this project is to identify and install alternative power technology, and investigate the establishment of Pittsburg Power service at the WTP to supplement the energy consumption of the WTP with off-grid, less expensive energy. The WTP currently draws over 4 million kilowatts of electricity from the regional energy provider, Pacific Gas and Electric Company, resulting in over $1 million in energy costs each year, which are passed on to residents. By reducing energy costs at the WTP, the City can pass those savings on to the residents, who can use them for other necessary living costs.

In addition to relieving the cost to Pittsburg’s rate payers, this project is a first step in the WTP’s plan to build resilience to the challenges posed by the existing energy provider’s inefficiencies and public safety power shutoff events, and diversifying the WTP’s energy sources to include either on-site generation or other technologies.

Attachments: Resolution
Grant Agreement

Report Prepared By: Sara Bellafronte, Assistant to the City Manager

Page 142 of 178 ends

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Authorizing the City Manager to Accept a )
Community Grant from the United States ) RESOLUTION NO. 25- Environmental Protection Agency and Enter)
Into a Grant Agreement )

WHEREAS, the City of Pittsburg operates a Water Treatment Plant (WTP) and purveys high quality drinking water to all Pittsburg residents and businesses; and

WHEREAS, the WTP currently draws over 4 million kilowatts of electricity from the regional energy provider, Pacific Gas and Electric company, resulting in over $1 million in energy costs each year, which are passed on to residents; and

WHEREAS, in 2024, the City was selected for a $959,752 federal earmark through the House Appropriations Committee and is eligible for receipt of grant funds administered by the United States Environmental Protection Agency under the Safe Drinking Water State Revolving Fund Community Grants Program; and

WHEREAS, the funding awarded to the City is intended to identify and install alternative off-grid power generation technology to meet the energy demand of the City’s WTP, pass on any energy cost savings to the ratepayers, and diversify the WTP’s energy sources to include either on-site generation or other technologies.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pittsburg hereby authorizes the City Manager to accept US EPA Safe Drinking Water State Revolving Fund Community Grants Program funds and enter into a grant agreement.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 6th day of October 2025, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

____
Jelani Killings, Mayor

ATTEST BY:

Alice E. Evenson, City Clerk

Page 143 of 178 ends

CG - 97T37401 - 0 Page 1

U.S. ENVIRONMENTAL

PROTECTION AGENCY
Grant Agreement
GRANT NUMBER (FAIN): 97T37401
MODIFICATION NUMBER: 0
PROGRAM CODE: CG

DATE OF AWARD
08/04/2025

TYPE OF ACTION
New

MAILING DATE
08/07/2025
PAYMENT METHOD:

Reimbursement
ACH#
90813
RECIPIENT TYPE:

Municipal
Send Payment Request to:

Contact EPA RTPFC at: [email protected]
RECIPIENT:

CITY OF PITTSBURG
65 CIVIC AVE
PITTSBURG, CA 94565-3814
EIN: 94-6000395
PAYEE:

CITY OF PITTSBURG
65 CIVIC AVE
PITTSBURG, CA 94565-3814

PROJECT MANAGER
John Samuelson
65 Civic Avenue
Pittsburg, CA 94565
[email protected]:
925-252-4271Phone:

EPA PROJECT OFFICER
Samuel Niederberger
75 Hawthorne Street, WTR-3-4
San Francisco, CA 94105
[email protected]:
213-244-1934Phone:

EPA GRANT SPECIALIST
Susan Chiu
Grants Branch, MSD-6
75 Hawthorne Street
San Francisco, CA 94105
[email protected]:
415-972-3664Phone:

PROJECT TITLE AND DESCRIPTION
Community Grants Program - Water Treatment Plant Energy Project See Attachment 1 for project description.

BUDGET PERIOD
10/01/2025 - 03/31/2027

PROJECT PERIOD
10/01/2025 - 03/31/2027

TOTAL BUDGET PERIOD COST
$ 120,000.00

TOTAL PROJECT PERIOD COST
$ 120,000.00

NOTICE OF AWARD
Based on your Application dated 04/24/2025 including all modifications and amendments, the United States acting by and through the US Environmental Protection Agency (EPA) hereby awards $ 120,000.00. EPA agrees to cost-share 100.00% of all approved budget period costs incurred, up to and not exceeding total federal funding of $ 120,000.00. Recipient's signature is not required on this agreement. The recipient demonstrates its commitment to carry out this award by either: 1) drawing down funds within 21 days after the EPA award or amendment mailing date; or 2) not filing a notice of disagreement with the award terms and conditions within 21 days after the EPA award or amendment mailing date. If the recipient disagrees with the terms and conditions specified in this award, the authorized representative of the recipient must furnish a notice of disagreement to the EPA Award Official within 21 days after the EPA award or amendment mailing date. In case of disagreement, and until the disagreement is resolved, the recipient should not draw down on the funds provided by this award/amendment, and any costs incurred by the recipient are at its own risk. This agreement is subject to applicable EPA regulatory and statutory provisions, all terms and conditions of this agreement and any attachments.

ISSUING OFFICE (GRANTS MANAGEMENT OFFICE)

ORGANIZATION / ADDRESS
U.S. EPA, Region 9, U.S. EPA, Region 9 Grants Branch, MSD-6 75 Hawthorne Street
San Francisco, CA 94105

AWARD APPROVAL OFFICE

ORGANIZATION / ADDRESS
U.S. EPA, Region 9, Water Division, WTR-1
R9 - Region 9
75 Hawthorne Street
San Francisco, CA 94105
THE UNITED STATES OF AMERICA BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY Digital signature applied by EPA Award Official Ellen Blake - Acting Grants Management Officer DATE 08/04/2025

Page 144 of 178 ends

CG - 97T37401 - 0 Page 2
EPA Funding Information

FUNDS FORMER AWARD THIS ACTION AMENDED TOTAL
EPA Amount This Action $ 0 $ 120,000 $ 120,000
EPA In-Kind Amount $ 0 $ 0 $ 0
Unexpended Prior Year Balance $ 0 $ 0 $ 0
Other Federal Funds $ 0 $ 0 $ 0
Recipient Contribution $ 0 $ 0 $ 0
State Contribution $ 0 $ 0 $ 0
Local Contribution $ 0 $ 0 $ 0
Other Contribution $ 0 $ 0 $ 0
Allowable Project Cost $ 0 $ 120,000 $ 120,000
Assistance Program

66.202 - Congressionally Mandated Projects
Statutory Authority
2024 Consolidated Appropriations Act (PL118-42)
Regulatory Authority
2 CFR 200, 2 CFR 1500 and 40 CFR 33
Fiscal
Site Name Req No FY Approp.

Code
Budget
Organization PRC Object
Class Site/Project Cost
Organization
Obligation /
Deobligation
- 2509W34047 24 E5 0924C4H 000B80 4192 - - $ 120,000
$ 120,000

Page 145 of 178 ends

CG - 97T37401 - 0 Page 3
Budget Summary Page
Table A - Object Class Category
(Non-Construction)
Total Approved Allowable
Budget Period Cost

1. Personnel $ 7,000

2. Fringe Benefits $ 3,000

3. Travel $ 0

4. Equipment $ 0

5. Supplies $ 0

6. Contractual $ 110,000

7. Construction $ 0

8. Other $ 0

9. Total Direct Charges $ 120,000

10. Indirect Costs: 0.00 % Base $ 0

11. Total (Share: Recipient ______ % Federal ______ %)0.00 100.00 $ 120,000

12. Total Approved Assistance Amount $ 120,000

13. Program Income $ 0

14. Total EPA Amount Awarded This Action $ 120,000

15. Total EPA Amount Awarded To Date $ 120,000

Page 146 of 178 ends

CG - 97T37401 - 0 Page 4
Attachment 1 - Project Description
This agreement provides funding to City of Pittsburg to implement its project to implement The Water Treatment Plant Energy Improvement Project as directed in the 2024 Consolidated Appropriations Act.

The funds will not be used for construction activities.

This agreement provides full federal funding in the amount of $120,000. The cost share requirement is waived by EPA per memo dated 2/7/2025. Refer to Terms and Conditions. The activities to be performed include the execution and implementation of a Water Treatment Plant Energy Improvement Project.

Workplan activities consist of: 1) planning and design activities necessary to complete a 100% design package, environmental reviews and documentation, interconnect agreements, and otherwise prepare for construction activities and required compliance. 2) Manage the project activities and implement controls to assure that the project is executed according to the agreed-upon scope, schedule, and budget, and that all mandated procedures, including reporting, are followed.

The anticipated deliverables include . . . RFP, executed agreement with consultant for design, 100% design plans and specifications, PG&E interconnect agreement request (and executed agreement if amenable), Any required environmental review, Quarterly and annual progress reports. The expected outcomes include . . . Technology Selected for deployment at WTP, PPC Allowed to purvey power at WTP in Pittsburg, Environmental Approvals. The intended beneficiaries include . . . The City of Pittsburg to move the project into phase II, which will pass the final benefits onto the residents of Pittsburg in the form of savings, and energy reliability.

No subawards are included in this assistance agreement.

Page 147 of 178 ends

CG - 97T37401 - 0 Page 5
Administrative Conditions
General Terms and Conditions
The recipient agrees to comply with the current Environmental Protection Agency (EPA) general terms and conditions available at: https://www.epa.gov/grants/epa-general-terms-and-conditions-effective- october-1-2024-or-later
These terms and conditions are in addition to the assurances and certifications made as a part of the award and the terms, conditions, or restrictions cited throughout the award.

The EPA repository for the general terms and conditions by year can be found at: https://www.epa. gov/grants/grant-terms-and-conditions#general.

A.  Federal Financial Reporting (FFR)
For awards with cumulative project and budget periods greater than 12 months, the recipient will submit an annual FFR (SF 425) covering the period from "project/budget period start date" to  September 30 of each calendar year to the EPA Finance Center in Research Triangle Park, NC.  The annual FFR will be submitted electronically to [email protected] no later than  December 30 of the same calendar year. Find additional information at https://www.epa.gov/financial/grants.  (Per 2 CFR § 200.344(b), the recipient must submit the Final FFR to [email protected] within 120 days after the end of the project period.)
B.  Procurement
The recipient will ensure all procurement transactions will be conducted in a manner providing full and open competition consistent with 2 CFR § 200.319. In accordance with 2 CFR § 200.324, the recipient and subawardee(s) must perform a cost or price analysis in connection with applicable procurement actions, including contract modifications. State and Tribal government entities must follow procurement standards as outlined in 2 CFR § 200.317.

C.  Indirect Costs
The Cost Principles under 2 CFR Part 200, Subpart E apply to this award.  Since there are no indirect costs included in the assistance budget, they are not allowable under this Assistance Agreement.

D.  Prior Approval of Payments for EPA Community Grants Payment Requests are to be completed on Standard Form 270, "Request for Advance or Reimbursement" and submitted to the EPA Grants Branch with a copy to the EPA Project Officer. This form and instructions for completing it can be found at https://www.epa.gov/grants/epa-grantee-forms.

The requests will report cumulative expenditures both (federal and non-federal) incurred under the grant.

EPA will approve payments for allowable expenditures at the ratio shown in the latest Agreement.

Under this payment mechanism, the recipient submits for EPA approval the Standard Form 270 along with supporting cost documentation via email to [email protected], the EPA Project Officer, and the EPA Grants Specialist listed on this award document. Attachments must be submitted in pdf or other acceptable software format (e.g., DocuSign) and the Standard Form 270 must be electronically or

Page 148 of 178 ends

CG - 97T37401 - 0 Page 6
digitally signed by your organization's authorized representative or their designee in accordance with EPA's Recipient/Applicant Information Notice (RAIN), Establishment of Standards for Submission of Administrative and Financial Assistance Agreement Forms/Documents with Electronic or Digital Signatures by Email. Documentation to support costs claimed for reimbursement include copies of bills (vouchers, invoices, etc.), along with a description of services rendered, time spent, and charges. The table below provides examples of acceptable documentation.

When transmitting documents to EPA, the recipient must take reasonable cybersecurity and other measures to safeguard information including protected personally identifiable information (PII) and other types of sensitive information (2 CFR § 200.303(e)). Also, as a reminder, please refer to the Grant- Specific Programmatic Terms and Conditions of this award for additional information regarding procurement documentation submission requirements.

After review and written notification of EPA's approval, the recipient will request funds via the U.S.

Treasury's Automated Standard Application for Payment (ASAP) system for 100% of the total allowable expenditures shown on the Standard Form 270 (i.e., the Federal share) for the period covered by the request. Payment for costs approved by EPA and authorized for drawdown by the recipient via the ASAP System will be credited to the recipient's designated financial institution (See Financial Information in the EPA General Terms and Conditions applicable to this award). Any questioned or disallowed costs will be detailed in writing by EPA's Grants Management Officer.

SUPPORTING DOCUMENTATION BY BUDGET CATEGORY

BUDGET CATEGORY ACCEPTABLE DOCUMENTATION

1. PERSONNEL-- (For both EPA-funded
and non-EPA funded employees whose
services will count towards the recipient's
cost share) Records must:  - meet the
requirements in 2 CFR § 200.430(g) for
producing accurate information regarding
actual hours an employee worked
performing the EPA agreement.- reflect
100% of actual hours worked daily and the
projects, programs or activities worked, not
estimated amounts or percentages.  They
must also reflect non-working hours used
during the pay period. - be certified by an
appropriate recipient manager indicating that
the hours shown as worked in support of the
EPA assistance agreement were actually
spent on activities approved and eligible
under the agreement for which the costs are
claimed- contain names of employees
charging time to the agreement, with explicit
indication of number of hours charged, the
hourly rate, and the total amount thereof
charged.
1a.  Working Hours -  copies of time sheets or equivalent personnel activity reports

Page 149 of 178 ends

CG - 97T37401 - 0 Page 7
1b. Non-Working Hours-- (e.g., sick leave,
annual leave, holiday pay, etc.) being
charged to the agreement if not covered by
a leave rate or included in fringe benefits.
-  a schedule or report showing the non-
working hour cost calculations and amounts
claimed, including the applicable accruals
and distribution methodologies for the
periods used in the calculations.

2. FRINGE BENEFITS-- if applicable,
approved fringe rate or actual costs per
employee.
-  a schedule or report showing the fringe
benefit cost calculations per employee, per
pay period being claimed for payment and
charged to the assistance
agreement. Individual items included in
approved fringe benefit rates must be
identified.

3. INDIRECT COSTS-- Either an approved
indirect cost rate agreement covering the
period for the indirect costs being claimed,
or otherwise approved to use the 15% de
minimis rate. See the General Terms and
Conditions for additional information.
-  a schedule or report showing the indirect
costs calculations and amounts claimed and
charged to the assistance agreement,
including the applicable rates and cost basis
for the periods used in the calculations.

4. TRAVEL--  Note: First class/business
class travel costs are not allowable.
- listing of trips taken, trip dates, location,
purpose, and actual costs incurred.- copy of
signed and dated authorization documents
for each trip. - written certification by
employee's supervisor or other authorized
official that the trip took place.- copy of
signed and dated travel vouchers showing
actual expenditures

5. EQUIPMENT-- Records must show
equipment items, quantity, unit cost, and
total amount consistent with the PO and
RFP.
- copy of procurement requests- copy of
vendor invoices- quotes or bid
announcements as required

6. SUPPLIES
- invoices showing supply items, quantity,
unit cost, and total amount consistent with
the Purchase Order.- copy of procurement
requests- copy of vendor invoices- quotes or
bid announcements as required

7. CONTRACTUAL-- The contract
agreement must include all applicable
clauses stipulated at 2 CFR § 200.327 and
Appendix II. NOTE:  Per the grant-specific
Programmatic Terms and Conditions of the
award, all contracts should have already
been reviewed and approved by the EPA
project officer.Contracts for Architectural and
Engineering services are included in this
category.The costs for consultant
compensation that are charged to the EPA
assistance agreement (including cost
shares) must not exceed the consultant cap
(Level IV of the Executive Schedule) as
- documents showing quotes or bid
announcements as required.- evidence of
the selection decision and a cost and price
analysis- copy of contractor invoices

Page 150 of 178 ends

CG - 97T37401 - 0 Page 8
described at 2 CFR § 1500.10

8. CONSTRUCTION-- This category
includes contracts for general construction
and other contractor costs for activities
described in EPA's DBE Rule at 40 CFR §

33.103
- documents showing quotes or bid
announcements as applicable.- evidence of
the selection decision and a cost and price
analysis- copy of contractor and vendor
invoices

9.  OTHER-- If subaward costs are being
claimed, a copy of the executed subaward
agreement must be provided. The subaward
agreement must comply with the
requirements of the subaward term and
condition of the EPA award and 2 CFR §§
200.331 and 200.332.
- invoices showing items, quantity, unit cost,
and total amount. As applicable, ensure
there are:- copies of procurement requests-
copy of vendor invoices- quotes or bid
announcements as required- documentation
of participant support cost payments
approved in the budget- cost
Calculations/Allocations of shared costs like
rent, utilities, etc.

Page 151 of 178 ends

CG - 97T37401 - 0 Page 9
Programmatic Conditions
A.]  Performance Reporting (2 CFR 200.329)
The recipient agrees to submit quarterly performance reports electronically to the EPA Project Officer due no later than 30 calendar days after the end of each federal fiscal quarter (January 30, April 30, July 30, and October 30). The final performance report must be submitted no later than 120 calendar days after the period of performance.

Performance reports must relate financial data and project or program accomplishments to performance goals and objectives and include brief information on each of the following areas, as applicable: 1) a comparison of accomplishments to the outputs/outcomes established in the assistance agreement workplan for the reporting period; 2) explanations on why established outputs/outcomes were not met; and 3) additional information, analysis, and explanation of cost overruns or higher-than-expected unit costs. The recipient agrees to inform EPA as soon as problems, delays, or adverse conditions become known which will materially impair the ability to meet the outputs/outcomes specified in the assistance agreement workplan.

B.]  Project changes (2 CFR 200.308)
Consistent with 2 CFR 200.308, the recipient must request prior written approval from EPA for the following program and budget-related reasons, including: changes which alter the project performance standards; changes in the scope or objectives of the project (even if there is no associated budget revision requiring prior written approval) or substantially altering the design of the project; changes in key personnel (including employees and contractors) that are identified by name or position in the Federal award; the disengagement from a project for more than three months, or a 25% reduction in time and effort devoted to the Federal award over the course of the period of performance, by the approved project director or principal investigator; the inclusion, unless waived by the EPA, of costs that require prior approval in accordance with subpart E to 2 CFR Part 200 as applicable; the transfer funds between construction and non-construction budget categories; significantly delaying or accelerating the project schedule; or substantially altering the facilities plan, design drawings and specifications, or the location, size, capacity, or quality of any major part of the project. Note, depending on the type of change, the Agency Award Official or Grant Management Officer may need to make the final determination.

C.]  Right of Access (2 CFR 200.337)
EPA will have access to all records which are pertinent to the assistance agreement (including fiscal, procurement, and engineering data and files), and EPA may conduct site visits and inspections related to progress of the assistance agreement workplan activities.

Procurement Document Submission
(1) With the exception of projects that qualify for the procurement flexibilities in the FY 2024 Consolidated Appropriations Act (P.L. 118-42) discussed below in term and condition D. Procurement, the recipient shall submit a copy of all proposed and/or executed contracts for services (including professional and construction), supplies, and equipment over $250,000 to the EPA Project Officer for review. The submittal of the proposed and/or executed contracts must include procurement records. (a) Recipient agrees to submit plans and specifications, requests for proposals, invitations for bids,

Page 152 of 178 ends

CG - 97T37401 - 0 Page 10
scopes of work, and/or plans and specifications to the EPA Project Officer for review prior to advertising for bids, or as soon as practicable thereafter if a contract has been executed or performance under the contract has begun. Recipient will also submit any addenda to these documents to the EPA Project Officer for review prior to the opening of bids, or as soon as practicable thereafter if a contract has been executed or performance under the contract has begun.
(b) Recipient agrees to submit to the EPA Project Officer, within ten calendar days after a bid opening, or as soon as practicable thereafter if a contract has been executed or performance under the contract has begun, the bid package of the lowest responsive, responsible bidder for review prior to the award of a contract, or as soon as practicable thereafter if a contract has been executed or performance under the contract has begun. The bid package will include a bid tabulation, a copy of the proof of advertising, the bid bond of the low bidder, the Minority Business Enterprise(MBE) / Women's Business Enterprise (WBE) proposed utilization by the low bidder with a statement from Recipient that the efforts taken by the low bidder meet the statutory/regulatory requirements, and the recommendation to award a contract to the low bidder.
(c) Recipient agrees to submit to the EPA Project Officer for review any proposed and/or executed contract for services, such as architectural/engineering or grant management or construction, prior to signing each contract, or as soon as practicable thereafter if a contract has been executed or performance under the contract has begun, as well as any change orders executed after the award of the contract.  A description of the process used to procure those services will also be submitted.  To be accepted as allowable project costs, such procurements/contracts must comply with all statutory and regulatory requirements, including 40 U.S.C. 1101 et seq. (the Brooks Act) or an equivalent State qualifications-based procurement requirement, as applicable; 2 CFR Part 200; 2 CFR Part 1500; and/or 40 CFR Part 33.
(2) Recipients that qualify for the procurement flexibilities discussed below in term and condition D.

Procurement, must provide to the EPA upon request solicitation documents (e.g., Request for Proposals or Request for Qualifications), contracts, and/or any other pertinent documents relating to the process used to enter the contract.
(3) All recipients, to include those that qualify for the procurement flexibilities in the FY 2024 Consolidated Appropriations Act (P.L. 118-42) discussed below in term and condition D. Procurement must comply with the requirements in the Davis-Bacon Act, American Iron and Steel (AIS), and Build America, Buy America (BABA) in any procurements and resulting contracts as applicable. These requirements include incorporating the appropriate prevailing wage determinations and AIS/BABA in the solicitation documents.

D.]  Procurement
The FY 2024 Consolidated Appropriations Act (P.L. 118-42), which was signed into law on March 9, 2024, states:

Provided further, That the funds made available under this heading for Community Project Funding/Congressionally Directed Spending grants in this or prior appropriations Acts are not subject to compliance with Federal procurement requirements for competition and methods of procurement applicable to Federal financial assistance, if a Community Project Funding/Congressionally Directed

Page 153 of 178 ends

CG - 97T37401 - 0 Page 11
Spending recipient has procured services or products through contracts entered into prior to the date of enactment of this legislation that complied with state and/or local laws governing competition. (a) Recipients with projects identified in the FY 2024 or prior (i.e., FY 2022 and FY 2023) Appropriations Acts are not subject to compliance with Federal procurement requirements for competition and methods of procurement applicable to Federal financial assistance if the recipient has:
procured services or products through contracts entered into prior to March 9, 2024; and

complied with state and/or local laws governing competition (including laws/policies relating to participation by disadvantaged business enterprises or equivalent, as applicable, and method of procurement).

The recipient must provide a written statement to the EPA Project Officer affirming any contracts entered into prior to March 9, 2024, complied with state and/or local laws governing competition (including laws/policies relating to participation by disadvantaged business enterprises or equivalent as applicable, and method of procurement). The statement must also include the date the contracts were entered into.

The contract will be considered covered by the provision upon receipt of written confirmation from EPA.

The recipient must retain documentation (e.g., solicitation documents, procurement certifications from state and/or local officials) demonstrating compliance of such contracts with state and/or local laws governing competition, including such laws relating to participation by disadvantaged business enterprises or equivalent as applicable.
(a)(1) Contract Amendments after March 9, 2024, and FY 2024 Procurement Flexibility Recipients with projects identified in the FY 2024 or prior (i.e., FY 2022 and FY 2023) Appropriations Acts  may not be subject to compliance with Federal procurement requirements for competition and methods of procurement applicable to Federal financial assistance (with the exception noted below in paragraph (a)(2) for contract modifications over the Simplified Acquisition Threshold in effect at the time of award) for contract amendments that occur after March 9, 2024, if the recipient has:
(i) procured services or products through contracts entered into prior to March 9, 2024; (ii) entered into said contracts in compliance with state and/or local laws governing competition (including laws/policies relating to participation by disadvantaged business enterprises or equivalent, as applicable, and method of procurement); and
(iii) complied with state and/or local laws relating to contract amendments as applicable.

The recipient must provide a written statement to the EPA Project Officer affirming any contracts entered into prior to March 9, 2024, and contract amendments after that date, complied with state and/or local laws governing competition (including laws/policies relating to participation by disadvantaged business enterprises or equivalent as applicable, and method of procurement). The statement must also include the date the contracts and contract amendments were entered into. The contracts and contract amendments will be considered covered by the provision upon receipt of written confirmation from EPA.

The recipient must retain documentation (e.g., solicitation documents, procurement certifications from state and/or local officials) demonstrating compliance of such contracts and amendments with state

Page 154 of 178 ends

CG - 97T37401 - 0 Page 12
and/or local laws governing competition, including such laws relating to participation by disadvantaged business enterprises or equivalent as applicable.
(2) Consistent with 2 CFR 200.324, the recipient further agrees that for all contract modifications/amendments in excess of the Simplified Acquisition Threshold in effect at the time of award, the recipient will perform a cost or price analysis. (b) All other recipients who do not qualify for the procurement flexibilities discussed in section (a) must procure all services (professional, construction, etc.), supplies, and equipment awarded under this grant in accordance with all applicable federal requirements, including: 40 U.S.C. 1101 et seq. (the Brooks Act) or an equivalent State qualifications-based procurement requirement, as applicable; 2 CFR Part 200; 2 CFR Part 1500; and/or 40 CFR Part 33. This includes all services (professional, construction, etc.), supplies, and equipment for which costs are approved as preaward costs. (c) Recipient must comply with the procurement processes for architectural and engineering (A/E) services as described in 40 U.S.C. 1101 et seq., or an equivalent State qualifications-based requirement.

Where equivalent State qualifications-based requirements are complied with, the source of the requirement (e.g., existing State legislation or regulation, etc.) must be stated, and a certification from the Governor of the State that the State's A/E procurement requirements are equivalent to 40 U.S.C. 1101 et seq. must accompany the grant application. In lieu of a certification from the Governor, the Attorney General's certification submitted with each grant application may include this certification. The requirements of 40 U.S.C. 1101 et seq. include:

Public announcement of the solicitation (e.g., public announcement of a Request for Qualifications);

Evaluation and ranking of the submitted qualifications statements based on established, publicly available criteria (e.g., criteria identified in the solicitation); Evaluation criteria should be based on demonstrated competence and qualifications for the type of professional services required (e.g., past performance, specialized experience, and technical competence in the type of work required);

Discussion with at least three firms to consider anticipated concepts and compare alternative methods for furnishing services;

Selection of at least three firms considered to be the most highly qualified to provide the services required; and

Contract negotiation with the most highly qualified firm to determine compensation that is fair and reasonable based on a clear understanding of the project scope, complexity, professional nature, and the estimated value of the services to be rendered; In the event that the recipient is unable to negotiate a satisfactory contract with the firm, the recipient shall formally terminate negotiations and then undertake negotiations with the next most qualified of the selected firms, continuing the process until an agreement is reached. If the recipient is unable to negotiate a satisfactory contract with any of the selected firms, the agency head shall select additional firms in order of their competence and qualification and continue negotiations in accordance with this section until an agreement is reached.

In the event that the State has no existing equivalent qualifications-based requirement for procurement,

Page 155 of 178 ends

CG - 97T37401 - 0 Page 13
the federal requirements in 40 U.S.C. 1101 et seq. apply. (d) All recipients, to include those that qualify for the procurement flexibilities discussed in section (a), must comply with the requirements in the Davis-Bacon Act, American Iron and Steel (AIS), and Build America, Buy America (BABA) in any procurements and resulting contracts as applicable. These requirements include incorporating the appropriate prevailing wage determinations and AIS/BABA in the solicitation documents.

E.]   Cybersecurity Grant Condition for Other Recipients (a) The recipient agrees that when collecting and managing environmental data under this assistance agreement, it will protect the data by following all applicable State or Tribal law cybersecurity requirements.
(b) (1) EPA must ensure that any connections between the recipient's network or information system and EPA networks used by the recipient to transfer data under this agreement, are secure. For purposes of this Section, a connection is defined as a dedicated persistent interface between an Agency IT system and an external IT system for the purpose of transferring information. Transitory, user-controlled connections such as website browsing are excluded from this definition.

If the recipient's connections as defined above do not go through the Environmental Information Exchange Network or EPA's Central Data Exchange, the recipient agrees to contact the EPA Project Officer (PO) no later than 90 days after the date of this award and work with the designated Regional/Headquarters Information Security Officer to ensure that the connections meet EPA security requirements, including entering into Interconnection Service Agreements as appropriate. This condition does not apply to manual entry of data by the recipient into systems operated and used by EPA's regulatory programs for the submission of reporting and/or compliance data. (2) The recipient agrees that any subawards it makes under this agreement will require the subrecipient to comply with the requirements in (b)(1) if the subrecipient's network or information system is connected to EPA networks to transfer data to the Agency using systems other than the Environmental Information Exchange Network or EPA's Central Data Exchange. The recipient will be in compliance with this condition: by including this requirement in subaward agreements; and during subrecipient monitoring deemed necessary by the recipient or subrecipient under 2 CFR 200.332(e), by inquiring whether the subrecipient has contacted the EPA Project Officer. Nothing in this condition requires the recipient to contact the EPA Project Officer on behalf of a subrecipient or to be involved in the negotiation of an Interconnection Service Agreement between the subrecipient and EPA.

F.]  Signage
The FY 2022 Consolidated Appropriations Act (Pub. Law 117-103), FY 2023 Consolidated Appropriations Act (Pub. Law 117- 328), and FY 2024 Consolidated Appropriations Act (Pub. Law 118- 42) provide that those federal requirements that would apply to a Clean Water State Revolving Fund (CWSRF) or Drinking Water State Revolving Fund (DWSRF) project grant recipient shall apply to a grantee receiving a Community Grant. Consequently, these Appropriations Acts extend Signage requirements applicable to SRF projects to Community Grants. The recipient agrees to comply with the SRF Signage Guidelines in order to enhance public awareness of EPA assistance agreements nationwide.

Page 156 of 178 ends

CG - 97T37401 - 0 Page 14
Basic Requirements
Recipients should note that they have the option of selecting different implementation options depending on the location, project type, and available resources. The costs of compliance with the signage requirements are allowable under the grant, provided the costs are reasonable. Recipients must ensure limited English proficient individuals have meaningful access to activities receiving EPA funds, consistent with Executive Order 13166 and EPA Order 1000.32.  In this regard, to increase public awareness of projects serving communities where English is not the predominant language, EPA encourages recipients to translate the language used (excluding the EPA logo or seal) into the appropriate non- English language(s).  The costs of such translation are allowable under the grant, provided the costs are reasonable.

Summary of Options
The SRF Signage Guidelines present a number of options which communities can explore to implement EPA's signage policy. The option selected should meet all of the Basic Requirements above while remaining cost-effective and accessible to a broad audience.  The following strategies are acceptable options for communities to follow:

Standard Signage
• Posters or wall signage in a public building or location • Newspaper or periodical advertisement for project construction, groundbreaking ceremony, or operation of the new or improved facility
• Online signage placed on community website or social media outlet • Press release
Each of these options is described in more detail in the sections below.

Implementation Option: Standard Signage
EPA recommends that large projects that involve significant expansion or construction of a new facility elect to publicize through standard signage.  This option should be selected for projects where the sign would be near a major road or thoroughfare or where the facility is in a location at which this would effectively publicize the upgrades.  Some facilities will not find this an appropriate or cost-effective solution.  For example, investing in a large road sign for a facility that is located in a rural area or where access is limited to a smaller service road would likely not be an optimal solution.

Signs can also be located away from the project site if there is another reasonable alternative.  For example, a community may elect to place a sign advertising the project near a body of water that receives discharge from a particular facility.

Recipients selecting projects that will implement this requirement through use of a traditional sign should ensure the following are included:
• The name of the facility, project, and community

Page 157 of 178 ends

CG - 97T37401 - 0 Page 15
• Project cost (total grant award amount, i.e., federal share plus recipient contribution) • The EPA and Recipient logos (EPA logo may only be used on a sign) If the EPA logo is displayed along with logos of other participating entities, the EPA logo must not be displayed in a manner that implies that EPA itself is conducting the project.  Instead, the EPA logo must be accompanied with a statement indicating that the recipient received financial assistance from EPA for the project.  As provided in the sign specifications from the EPA Office of Public Affairs (OPA), the EPA logo is the identifier for assistance agreement projects. Recipients are responsible to comply with the sign specifications provided by the OPA, available at https://www.epa.gov/grants/epa-logo-seal- specifications-signage-produced-epa-assistance-agreement-recipients.  To obtain the appropriate EPA logo graphic file, the recipient should send a request directly to OPA and include the EPA Project Officer in the communication; contact information can be found at https://www.epa.gov/aboutepa/using-epa- seal-and-logo#download.

Implementation Option: Posters, Brochures, and/or Pamphlets Smaller projects, projects located in rural areas, and other efforts may find that it is more cost-effective and practical to advertise efforts through creation of a poster or smaller sign. If the project involves nonpoint source or green infrastructure components, those can be described at the discretion of the recipient.

The poster or brochure and acknowledgement should be visible, as well as a website or other source of information for individuals that may be curious about the Community Grants program.  The recipient may also implement this option as a short pamphlet that is placed in one of the locations noted below for community members to read.

Posters, brochures, and/or pamphlets should be placed in a public location that is accessible to a wide audience of community members.  This can include, but is not limited to:
• Town or City Hall
• Community Center
• Locally owned or operated park or recreational facility • Public Library
• County/municipal government facilities
• Court house or other public meeting space
Given the low cost for producing multiple copies of the same poster, brochure, and/or pamphlet, communities can explore options for displaying these posters in several locations simultaneously.  This would achieve the overall objective of reaching a broad audience and publicizing the project.

Projects that will implement this requirement through use of posters, brochures, and/or pamphlets should ensure the following are included:

Page 158 of 178 ends

CG - 97T37401 - 0 Page 16
• Name of facility, project, and community
• Project is wholly or partially funded with EPA funding • Brief description of project
• Brief description of the water quality benefits the project will achieve Implementation Option: Newsletters, Periodicals, and/or Press Releases For communities where there is no suitable public space or where advertisement through signage is unlikely to reach community members effectively, projects can be advertised in a community newsletter or similar periodical.  States can use guidelines from their standard public notice practices.  For new construction, if a groundbreaking ceremony is to be held, an announcement could publicize or accompany publicity for this event.

In some cases, it may be appropriate for the recipient to issue a formal press release announcing construction of a new facility.  Distributing a single prepared statement concisely summarizing the project purpose and the joint funding from EPA and community resources can reach a wide audience as the statement goes through multiple news outlets.

If the recipient decides on a public and/or media event to publicize the accomplishment of significant events related to the project as a result of EPA support, the recipient must provide EPA with at least ten working days' notice of the event and the opportunity to attend and participate in the event.

Recipients that will implement this requirement through use of a newsletter, periodical, or press release should ensure the following are included:
• Name of facility, project, and community
• Project is wholly or partially funded with EPA funding • Brief description of the project
• Brief listing of water quality benefits to be achieved Implementation Option: Inserts and/or Pamphlets in Water/Sewer Bills Utilities can consider including a single-page insert within water and sewer bills that are mailed to residents and users in the affected community.  This approach would effectively publicize the project to those individuals directly benefitting from the project.  The flyer or insert could emphasize the environmental and public health benefits to the community.

Recipients that will implement this requirement through use of inserts and/or pamphlets in water/sewer bills should ensure the following are included:
• Name of facility, project, and community
• Project is wholly or partially funded with EPA funding

Page 159 of 178 ends

CG - 97T37401 - 0 Page 17
• Brief description of the project
• Brief listing of water quality benefits to be achieved Implementation Option: Online and/or Social Media Publicity Many communities are increasingly finding that the internet is the most cost-effective approach to publicizing their projects and reaching a broad audience of stakeholders. Online “signage” should follow the minimum information guidelines above and may appear on the town, community, and/or facility website if available.  In some cases, communities may be active on social media sites such as Facebook or X, formally known as Twitter.  These can be used as an opportunity for publicizing projects and information about how EPA funds are being used in the community.

These online announcements/notices may be appropriate for settings where physical signage would not be visible to a wide audience.  They can be a more cost-effective option than traditional signs or publicity in print media outlets.  This option may be most useful where the community's website is a well- recognized source of information for its residents.

In the case of some projects, such as nonpoint source, there might be additional opportunities for online publicity through partner agencies or organizations. This could take place either on the organization's website or through other social media outlets.

Projects that will implement this requirement through use of online and/or social media publicity should ensure the following are included:
• Name of facility, project, and community
• Project was wholly or partially funded with EPA funding • Brief description of the project
• Brief listing of water quality benefits to be achieved Suggested Language for Alternate Options
For any of the alternate implementation options listed above, recipients have discretion to structure their signage as they see appropriate.  The language below is offered as an option for use in posters, pamphlets, brochures, press releases, and/or online materials.  Communities may consider using the following:
“Construction of upgrades and improvements to the [Name of Facility, Project Location, or WWTP] were financed by the grant funding administered by the U.S. Environmental Protection Agency (EPA). EPA's Community Grant Program.  This project will (description of project) and will provide water quality benefits [details specifying particular benefits] for community residents and businesses in and near (name of town, city, and/or water body or watershed to benefit from project.) For projects in certain areas, recipients should consider whether it is appropriate to include additional details about the project.  Specific benefits, such as reduction of CSO events, lessening of nutrient pollution, reducing contaminant levels or water pumping costs, or improvements to a particular water

Page 160 of 178 ends

CG - 97T37401 - 0 Page 18
body, may be of interest to community residents.  In these cases, including additional detail would further serve to showcase positive efforts financed by EPA.  Additionally, recipients may elect to detail improvements in energy efficiency or water conservation achieved by project upgrades.  If the project includes green infrastructure components such as rain gardens and green roofs that have environmental and aesthetic benefits to the community, these can be described briefly as well.  Again, this additional information can be included at the discretion of the recipient when it is appropriate, given the project type, location, and the type of signage or publicity effort selected.

G.]  Public or Media Events
The recipient will notify the EPA Project Officer listed in this award document of public or media events publicizing the accomplishment of significant events related to the project as a result of EPA support and provide the opportunity for attendance and participation by federal representatives with at least ten working days notice.

H.]  Federal Cross-cutting Requirements/Other Applicable Federal Laws Recipient must comply with federal cross-cutting requirements as well as other applicable federal laws as provided in EPA's Community Grants Program Final Implementation Guidance. For additional information on cross-cutting requirements, as well as applicability for recipients and subrecipients, visit https://www.epa.gov/grants/epa-subaward-cross-cutter-requirements.

I.]  American Iron and Steel (AIS)
AIS requirements apply to State Revolving Fund assistance agreements signed on or after January 17, 2014, including all treatment works projects funded by a CWSRF assistance agreement and all public water system projects funded by a DWSRF assistance agreement.  Based on the directive Congressional language in the FY 2022, FY 2023, and FY 2024 Consolidated Appropriations Acts' (i.e., “Applicable Federal requirements that would apply to a Clean Water State Revolving Fund or Drinking Water State Revolving Fund project grant recipient shall apply to a grantee receiving a CPF grant under this section”), AIS requirements apply to this award agreement. (a) Definitions. As used in this award term and condition— (1) “iron and steel products” mean the following products made primarily of iron or steel, where “primarily” means 50% or greater iron/steel, measured by materials costs: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and ferrous construction materials. (2) “steel” means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
(b)  Domestic preference.
(1) This award term and condition requires that all iron and steel products used for a project for the construction, alteration, maintenance or repair of a public water system or treatment work are produced in the United States except as provided in paragraph (b)(2) of this section and condition. “Produced in

Page 161 of 178 ends

CG - 97T37401 - 0 Page 19
the United States means all manufacturing processes, beginning with initial melting, must occur in the United States.
(2) This requirement shall not apply in any case or category of cases in which the Administrator of the Environmental Protection Agency finds that—
(i) applying the requirement would be inconsistent with the public interest; (ii) iron and steel products are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii) inclusion of iron and steel products produced in the United States will increase the cost of the overall project by more than 25 percent.
(3) The Build America, Buy America (BABA) Act requirements do not supersede the AIS requirements, and both provisions still apply and work in conjunction. Compliance with AIS requirements meets the BABA requirements for iron and steel.
(c) Request for a Waiver under (b)(2) of this section.
(1) Any recipient request to use foreign iron or steel products in accordance with paragraph (b)(2) of this section shall include adequate information for federal Government evaluation of the request, including—
(i) A description of the foreign and domestic iron and/or steel, ; (ii) Unit of measure;
(iii) Quantity;
(iv) Cost;
(v) Time of delivery or availability;
(vi) Location of the project;
(vii) Name and address of the proposed supplier; and
(viii) A detailed justification of the reason for use of foreign iron or steel products cited in accordance with paragraph (b)(2) of this section.
(2) If the Administrator receives a request for a waiver under this section, the waiver request shall be made available to the public for at least 15 days prior to making a finding based on the request. (3) Unless the Administrator issues a waiver of this term, use of foreign iron and steel products is noncompliant with Section 608 of the Clean Water Act and Section 1452(a)(4) of the Safe Drinking Water Act.

Page 162 of 178 ends

CG - 97T37401 - 0 Page 20
(d)  This term and condition shall be applied in a manner consistent with United States obligations under international agreements.

J.]  Build America, Buy America Act (BABA)
This term and condition supplements the “Build America, Buy America” term and condition included in EPA's General Terms and Conditions.
(a) Definitions.

As used in this award term and condition —
(1) “Build America, Buy America Preference'' means the “domestic content procurement preference” set forth in section 70914 of the Build America, Buy America Act, which requires the head of each Federal agency to ensure that none of the funds made available for a Federal award for an infrastructure project may be obligated unless all of the iron, steel, manufactured products, and construction materials incorporated into the project are produced in the United States. (2) “Infrastructure” encompasses public infrastructure projects in the United States, which includes, at a minimum, the structures, facilities, and equipment for roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property; and structures, facilities, and equipment that generate, transport, and distribute energy including electric vehicle (EV) charging. (3) ‘‘Infrastructure Project'' means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project.
(b) Domestic Preference.

This term and condition implements the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58, including Build America, Buy America Act, Pub. L. No. 117-58, §§70901-52. None of the funds provided under this award may be used for a project for infrastructure unless:
(1)  all iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
(2)  all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard that meets or exceeds this standard has been established under applicable law or regulation for determining the minimum amount of domestic content of the manufactured product; and

Page 163 of 178 ends

CG - 97T37401 - 0 Page 21
(3) all construction materials  are manufactured in the United States. All manufacturing processes for the construction material occurred in the United States. Construction materials includes an article, material, or supply—other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives—that is or consists primarily of:
• non-ferrous metals;
• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
• fiber optic cable (including drop cable);
• optical fiber;
• glass (including optic glass);
• lumber;
• drywall; and
• engineered wood.
(4) The Build America, Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.
(c) Waiver Request.
(1) When necessary, recipients may apply for a waiver from these requirements. (2) A request to waive the application of the domestic content procurement preference must be in writing and submitted following the waiver instructions at https://www.epa.gov/cwsrf/build-america-buy-america- baba.
(3) Waiver requests are subject to public comment for at least 15 days prior to making a finding based on the request.
(4) Waiver requests are subject to review by the Office of Management and Budget's Made in America Office.
(5) There may be instances where an award qualifies, in whole or in part, for an existing waiver described at https://www.epa.gov/cwsrf/build-america-buy-america-baba-approved-waivers. (6) The U.S. Environmental Protection Agency may grant a waiver based upon one of the exceptions as

Page 164 of 178 ends

CG - 97T37401 - 0 Page 22
established in Section 70914(b) of the Infrastructure Investment and Jobs Act and further described in the Office of Management and Budget Memorandum M-24-02-. (7) Any recipient waiver request to use foreign iron, steel, manufactured products, and/or construction materials in an infrastructure project shall include adequate information for the Federal Government evaluation of the request, including—
i. The Federal Award Identification Number (FAIN);
ii. Location and description of the project;
iii. Total cost of infrastructure expenditures, including federal and non-federal funds; iv. List of iron or steel item(s), manufactured products, and construction material(s) proposed to be excepted from Buy America requirements, including name, cost, country(ies) of origin (if known), relevant Product Services Code (PSC) and North American Industry Classification System (NAICS) code for each, unit of measure, quantity, time of delivery or availability, and name and address of the proposed supplier;
v. Project schedule including earliest targeted installation dates of items requested to be waived; vi. A detailed justification of the reason for use of foreign iron, steel, manufactured products, and/or construction materials;
vii. Recipient's Unique Entity Identifier (UEI);
vii. Anticipated impact if no waiver is issued; and
viii. A certification that the federal official or assistance recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and nonproprietary communications with the prime contractor. (8) Unless a waiver applies, use of foreign iron, steel, manufactured products, and/or construction materials that are consumed in, incorporated into, or affixed to an infrastructure project is noncompliant with this term and condition pursuant to the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58, including Build America, Buy America Act, Pub. L. No. 117-58 §§70901-52. (d) Waiver Evidence Submission.
(1) The recipient must maintain documentation of any use of materials which are considered de minimis and are covered by an existing waiver (e.g. miscellaneous, generally low-cost products that are essential for construction and are incorporated into the physical structure of the project) with grant project files for a period of three years from the date of submission of the final expenditure report, in accordance with 2 CFR 200.334.
(2) If the recipient seeks coverage under an existing general applicability BABA waiver, the recipient agrees to submit available evidence to the EPA Project Officer to support such a determination as identified in the BABA waiver. The recipient shall maintain this evidence with grant project files for a period of three years from the date of submission of the final expenditure report, in accordance with 2

Page 165 of 178 ends

CG - 97T37401 - 0 Page 23
CFR 200.334.

K.]  Environmental Review
The EPA is initially awarding $120,000 in funds for activities listed in paragraphs 40 C.F.R. 6.204(a)(2)(i)- (x) (e.g., planning, architectural, engineering, and pre-design work). No environmental documentation is required, and the recipient may only draw down funds for activities listed in paragraphs 40 C.F.R. 6.204 (a)(2)(i)-(x). Recipient shall not draw down the EPA funds or make any expenditures to meet a cost share obligation, for construction-related activities such as destruction, excavation, modification of existing structures, ground-disturbing work including rehabilitation and replacement activities, modifying, removing or demolishing structures, or other improvements to real property.

The EPA will not award additional funds for activities not listed in 40 C.F.R. 6.204(a)(2)(i)-(x) (noted above) until the EPA has complied with the National Environmental Policy Act (NEPA), 42 U.S.C. § 4321 et seq., and EPA implementing regulations at 40 CFR Part 6. Recipients must also comply with Federal cross-cutting environmental authorities as well as other applicable Federal laws. In order for the EPA to carry out its environmental review obligations under NEPA and other Federal cross-cutting environmental authorities, recipient must provide the EPA with information on all impacts the construction activities may have on the quality of the human environment. This may include, at the direction of the EPA Project Officer, providing an Environmental Information Document to the EPA to assist the EPA in preparing the required NEPA review document. The recipient may charge costs for providing this information to the initial award. Once the EPA completes its NEPA review, the EPA Project Officer will notify the recipient that the grant agreement is being amended to add remaining funds to the award to cover the costs of construction. After the amendment is processed, recipient may drawdown funds for construction activities.

L.]  Davis-Bacon Labor Standards

1. Program Applicability
a. Program Name: Community Grants Program
b. Statutes requiring compliance with Davis-Bacon:

Consolidated Appropriations Act, 2022 (P.L. 117-103);

Consolidated Appropriations Act, 2023 (P.L. 117-328); and

Consolidated Appropriations Act, 2024 (P.L. 118-42)

c. Activities subject to Davis-Bacon:

For Community Grants Projects that are inclusive of CWSRF-eligible activities: Treatment works constructed in whole or in part with assistance made available by the FY 2022, FY 2023, and/or FY 2024 Consolidated Appropriations Acts discussed in section b.

For Community Grants Projects that are inclusive of DWSRF-eligible activities: Any construction

Page 166 of 178 ends

CG - 97T37401 - 0 Page 24
project carried out in whole or part with assistance made available by the FY 2022, FY 2023, and/or FY 2024 Consolidated Appropriations Acts discussed in section b. d. The recipient must work with the appropriate authorities to determine wage classifications for the specific project(s) or activities subject to Davis Bacon under this grant (or cooperative agreement).

2. Davis-Bacon and Related Acts
Davis-Bacon and Related Acts (DBRA) is a collection of labor standards provisions administered by the Department of Labor, that are applicable to grants involving construction. These labor standards include the:

Davis-Bacon Act, which requires payment of prevailing wage rates for laborers and mechanics on construction contracts of $2,000 or more;

Copeland “Anti-Kickback” Act, which prohibits a contractor or subcontractor from inducing an employee into giving up any part of the compensation to which he or she is entitled; and

Contract Work Hours and Safety Standards Act, which requires overtime wages to be paid for over 40 hours of work per week, under contracts in excess of $100,000

3. Recipient Responsibilities When Entering Into and Managing Contracts a. Solicitation and Contract Requirements:
i. Include the Correct Wage Determinations in Bid Solicitations and Contracts: Recipients are responsible for complying with the procedures provided in 29 CFR 1.6 when soliciting bids and awarding contracts. ii. Include DBRA Requirements in All Contracts: Include the following text on all contracts under this grant:
“By accepting this contract, the contractor acknowledges and agrees to the terms provided in the DBRA Requirements for Contractors and Subcontractors Under EPA Grants.” b. After Award of Contract:
i. Approve and Submit Requests for Additional Wages Rates: Work with contractors to request additional wage rates if required for contracts under this grant, as provided in 29 CFR 5.5(a)(1)(iii). ii. Provide Oversight ofContractors to Ensure Compliance with DBRA Provisions: Ensure contractor compliance with the terms of the contract, as required by 29 CFR 5.6.

4. Recipient Responsibilities When Establishing and Managing Additional Subawards a. Include DBRA Requirements in All Subawards (including Loans):

Include the following text on all subawards under this grant:
“By accepting this award, the EPA subrecipient acknowledges and agrees to the terms and conditions

Page 167 of 178 ends

CG - 97T37401 - 0 Page 25
provided in the DBRA Requirements for EPA Subrecipients.” b. Provide Oversight to Ensure Compliance with DBRA Provisions: Recipients are responsible for oversight of subrecipients and must ensure subrecipients comply with the requirements in 29 CFR 5.6.

5. The contract clauses set forth in this Term & Condition, along with the correct wage determinations, will be considered to be a part of every prime contract covered by Davis-Bacon and Related Acts (see 29 CFR 5.1), and will be effective by operation of law, whether or not they are included or incorporated by reference into such contract, unless the Department of Labor grants a variance, tolerance, or exemption.

Where the clauses and applicable wage determinations are effective by operation of law under this paragraph, the prime contractor must be compensated for any resulting increase in wages in accordance with applicable law.

M.]  Recipient Work Force
The recipient agrees that the use of Recipient's work force to perform grant-funded construction is subject to the provisions in 2 CFR Part 200.  Recipient agrees that both the rates paid for direct labor and the types of and costs for fringe benefits for Recipient's work force performing grant-funded activities will be in accordance with normal rates and benefits applicable to similar work performed by Recipient's work force but funded entirely with Recipient's funds.  Recipient will maintain adequate file documentation to support both the basis for pay rates and benefits, and the total costs charged to the grant for work performed by Recipient's work force.  Recipient will provide time sheets for each worker as back-up documentation when EPA payments are requested.

N.]  Flood Insurance
The recipient will acquire and maintain at its own cost any flood insurance made available to it under the National Flood Insurance Act of 1968, as amended, before the project is placed in operation. This condition shall not be applicable if, on the date of execution of this Grant Agreement by both parties, flood insurance was not available pursuant to the Flood Insurance Act of 1968, as amended, for property on the project location.

O.]  Operation and Maintenance
The recipient agrees that that it will properly operate and maintain all facilities that are partially or wholly funded by this grant for the useful life of the facilities as described below.

Useful Life Timeframes
• Land - Permanent
• Wastewater/Water Conveyance Structures: collection systems, pipes, interceptors, force mains, tunnels, distribution lines, etc. - 40 years
• Other Structures: plant buildings, concrete tankage, basins, lift stations and pump station structures, inlet structures, etc. - 30 years

Page 168 of 178 ends
← All documents from this meeting