EXECUTIVE SUMMARY
ADVANTEC brings outstanding professionals with clear roles to provide the City of Placentia all the professional services that may be needed or required under this contract. ADVANTEC will provide both, Traffic Signal Operation Management Services and Traffic Engineering Services ADVANTEC has provided similar services and have worked on multiple projects through various funding sources (local, regional, state, federal) including local cities in both Orange County and Los Angeles County, OCTA, County of Los Angeles Public Works, Caltrans District 12, and numerous agencies throughout Southern California.

ADVANTEC recognizes that the successful delivery of high-quality traffic engineering/ transportation planning projects starts with assigning a Project Manager that possesses superior technical, management and leadership skills. Mr. Jose Guedes, TE, will serve as our Project Manager, leading our team and acting as primary point of contact to the City of Placentia during this contract. Jose brings 34 years of experience managing traffic signal operations and synchronization projects, as well as on-call traffic engineering contracts. Mr. Guedes will also serve as Task Leader on the Traffic Signal Operation Management, as he brings 14 years of experience managing traffic operations and the Traffic Management Center for the City of Irvine, and another 14 years managing the on-call signal operations contract with the City of Chino Hills. He will be supported by experienced California-registered Civil, Electrical, and Traffic Engineers, and other qualified professionals capable of managing day-to-day tasks under this contract.

By selecting ADVANTEC, the City of Placentia will realize the following benefits:
 ADVANTEC has the Right Experience and Technical Competence. We have provided Traffic/Transportation Engineering, Traffic Signal Improvements, Transportation Planning, Traffic Study Development, Traffic Signal Timing, and Intelligent Transportation Systems (ITS) Design and Integration to various agencies including the cities of Huntington Beach, Seal Beach, Newport Beach, Westminster, Garden Grove, Santa Ana, Orange, Irvine, Mission Viejo, Laguna Hills, Lake Forest, Aliso Viejo, Rancho Santa Margarita, La Habra, San Clemente, Claremont, Pico Rivera, City of Industry, Alhambra, Monterey Park, Culver City, Norwalk, Lancaster, County of Los Angeles, and Caltrans District 12. Our key staff are fully familiar with the technical and institutional needs of this contract and have been carefully selected for their expertise in the specific disciplines required under this contract.
 Our Method to Accomplish Assigned Task Orders. ADVANTEC has been providing professional On-Call or As- Needed Services for various agencies throughout Southern California including cities, counties, Caltrans, ports, and other transportation agencies. The ADVANTEC Team has significant experience working on simultaneous tasks for clients under on-call contracts and on multiple tasks associated with larger projects. This is the nature of our business, and Mr. Carlos Ortiz. PE, TE, PTOE (Project Director) and Mr. Jose Guedes, TE (Project Manager) have demonstrated their ability to manage and maintain budgets and schedules working on concurrent projects. Our Project Manager will be supported by experienced California registered Civil, Traffic and Electrical Engineers, System Integrators, and other qualified professionals capable of managing day-to-day tasks under this contract.
 Project Organization and Depth of Experts and Resources. ADVANTEC brings a team of experts and resources with experience in delivering similar initiatives or projects and with a commanding expertise on local, state, and federal, policies, programs, requirements, and initiatives. Our team members include experts that are working on various As-Needed or On-Call contracts providing similar professional services.  On-Call Traffic Engineering Experience and Expertise. ADVANTEC meets the City’s needs related to all On-Call Traffic Engineering Services listed in the RFP including Traffic Signal Operation Management, and Traffic Engineering.
340

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 2 ends

PROJECT TEAM ORGANIZATION
ADVANTEC’s TEAM ORGANIZATION
Mobilizing appropriate staff quickly is essential to smooth the performance of this important contract for the City of Placentia. This requires a management approach that emphasizes streamlined communication and quality control. As a partner to the City, the ADVANTEC Team will commit to the delivery of each task order within time and budget. We recognize that City staff has high expectations for capability and performance. Figure 1 illustrates the proposed organizational structure of our project team.

PROJECT MANAGER: ADVANTEC recognizes that the successful delivery of high-quality traffic engineering/ transportation planning projects starts with assigning a Project Manager that possesses superior technical, management and leadership skills. Mr. Jose Guedes, TE, will serve as our Project Manager, leading our team and acting as primary point of contact to the City of Placentia during this contract. Jose brings 34 years of experience managing traffic signal operations and synchronization projects, as well as on-call traffic engineering contracts. Mr.

Guedes will also serve as Task Leader on the Traffic Signal Operation Management, as he brings 14 years of experience managing traffic operations and the Traffic Management Center for the City of Irvine, and another 14 years managing the on-call signal operations contract with the City of Chino Hills. He will be supported by experienced California-registered Civil, Electrical, and Traffic Engineers, and other qualified professionals capable of managing day-to-day tasks under this contract.

KEY PERSONNEL: Selection of qualified team members to work with the Project Manager is a necessity in implementing and sustaining a proven project approach. ADVANTEC's proposed key personnel and support staff as shown in our Organization Chart are available to fulfill their time commitments in accordance with the project schedule. Mr. Guedes leads a team of professionals who have worked on numerous On-Call Civil/Public Works/Traffic Engineering On-Call Contracts
throughout Southern California: Mr. Carlos Ortiz,
and Mr. John Dorado have managed various
similar Task Orders under various Traffic
Engineering On-Call contracts. This long-term
experience provides a great benefit to the City of
Placentia in that these key Team Leaders have
shared technical and leadership growth together,
resulting in a recognized ability to deliver a high-
quality end product without costly surprises or
project misdirection.

Our Traffic Engineering Task Leader, Mr. John
Dorado, PE, has managed many traffic and
transportation on-call contracts throughout
southern California. He brings over 25 years of
traffic and transportation planning/ engineering,
ITS, and project management experience on local
agency streets and arterials, Caltrans projects and
public transportation funding measures.

John Cox, Systems Engineer, will be a Task Leader
for any Traffic Signal Systems Design and
Maintenance related task orders. He brings over
25 years of experience in traffic engineering
projects that include both design and
Figure 1 Organizational Chart

SUPPORT STAFF

KEY SUPPORT STAFF
Madeleine Ortiz
Jonathan Delgado, PE
Henry Trinh, PE, EE
David Madera, PE, TE
Armando Solis, PE
Glen Murphy, PE
Francisco Fernandez
Alphonse Oh
Rachel Tam
Robert Steaffens
Nicholas Park
Sean Ho
Frank Gomez
Dylan Sison
Kevin Acuna
Edward Clay
Brandon Chin
Yasmeen Halabi
James Tai
Huy Trinh
Daniel Underwood
Jose Guedes, TE
Project Manager
Carlos Ortiz, PE, TE, PTOE
Project Director

KEY SUPPORT STAFF
Ryan Miller
Jose Guedes, TE
Traffic Signal Operation
Management
Task Leader
John Dorado, PE
Traffic Engineering
Task Leader
John Cox
Traffic Signal Systems/
Design & Maintenance
Task Leader

KEY PERSONNEL
341

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 3 ends

implementation of Traffic Signal, ITS, CCTV, CMS, TMS and Fiber Optic Communications having integrated and maintained such systems in support of centralized signal control deployments.

Our Chief Executive Officer, Mr. Carlos Ortiz, PE, TE, PTOE will serve as Project Director. Mr. Ortiz has over 30 years of experience working as Project Manager on many high-profile projects and On-call Engineering services for several agencies and brings his record of success to the City of Placentia.

ADVANTEC’s project staff meets all the technical engineering and planning needs under this contract. The ADVANTEC Team brings a group of highly specialized personnel with a defined work history providing similar Professional/On-Call Services. ADVANTEC has been committed to our clients’ success for many years, and our expert team will provide the appropriate project management and technical expertise as required for this On-Call contract. ADVANTEC’s proposed project team is committed to providing responsive services to the City. In order to facilitate task order project delivery, we are assigning Key Support Staff that will work “directly” with each of our Task Leaders.

Our proposed key team members are intended to serve in their respective roles throughout the duration of the agreement. All staff members proposed are without long-range commitments that would interfere with the timely completion of potential tasks. Our Key Personnel will not be removed or replaced without a prior written concurrence from the City. Our team brings together all of the skills and expertise required to ensure satisfactory completion of all elements of the RFQ. Capsule resumes of our Task Leaders/Key Personnel are provided in Table

1. This table summarizes our Key Team Members education, certifications, role and responsibilities, and relevant experience. Full resumes of key personnel are provided in the Appendix.

JOSE GUEDES, TE

PROJECT MANAGER &

TRAFFIC SIGNAL OPERATION

MANAGEMENT TASK LEADER
[email protected]

TRAFFIC ENGINEERING / TRANSPORTATION
PLANNING/ ENGINEERING EXPERIENCE:
 Inter-agency signal synchronization
 Signal timing and operations
 Corridor/Network Synchro Model
 Adaptive Control Systems
 Before & After Studies
 Traffic signal systems
 Traffic signal communication systems
 Advanced Traffic Management Systems (ATMS)
 Safety Studies

RELEVANT PROJECT EXPERIENCE
 Mr. Guedes, TE has over 30 years of experience in traffic operations, traffic engineering and intelligent transportation systems, including 14 years conducting and managing traffic engineering, transportation planning and operations, traffic signal synchronization and ITS projects. Most recently, Jose is managing On-Call Traffic Engineering and Signal Operations Services with the cities of Glendale, Irvine and Chino Hills; He is responsible for managing task orders, assigning staff, scope of work and fees for various traffic engineering and planning projects. Mr. Guedes also managed the traffic signal operations in the City of Irvine for 14 years prior to joining ADVANTEC. Since 2010, he has managed 10 regional signal synchronization projects for OCTA and local agencies.  On-Call Traffic Engineering Services, Irvine
 On-Call Traffic Signal Operations, Chino Hills
 On-Call Traffic Engineering Services, Glendale
 CV Sync Program Phase I Traffic Signal Synchronization, CVAG  Citywide Engineering and Traffic Survey, Glendora
 Yorba Linda Blvd TLSP (OCTA)
 Fairview Rd Traffic Signal Synch, Costa Mesa
 Citywide Traffic Signal Coordination/Retiming, Lancaster  Citywide Adaptive Traffic System, Culver City
 Los Alisos Blvd RTSSP (OCTA)
 Adaptive/Traffic Responsive Upgrade, Alhambra
 Citywide Signal Assessment and Master Plan,
Upland
 Citywide Traffic and Mobility Study, Glendale
 Local Roadway Safety Plan, Yucca Valley
Years of Experience: 34
Years with ADVANTEC: 14
Registration:

Traffic Engineer, CA, 1861
Education:

B.S., Civil Engineering
M.S., Transportation Engineering
342

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 4 ends

CARLOS ORTIZ, PE, TE, PTOE

PROJECT DIRECTOR
[email protected]

TRAFFIC ENGINEERING / TRANSPORTATION
PLANNING/ ENGINEERING EXPERIENCE:
 Traffic Signals PS&E
 Public Works | ITS Planning and Design
 Advanced Traffic Management Systems
 Smart Transportation Management System
 Communication network/topology
 Cyber Security | Connected/Automated Vehicles
| Smart Cities
 Cooperative/Partnering Agreements
 Community Outreach | Inter-Agency Coordinator
 Traffic Studies | Parking Studies
 Active Transportation

RELEVANT PROJECT EXPERIENCE

Mr. Carlos Ortiz, PE, TE, PTOE will serve as Project Director and possesses superior technical, management, and leadership skills. Mr. Ortiz has extensive experience managing Traffic Engineering and Intelligent Transportation System (ITS) projects for numerous agencies throughout California. He has worked on many complex projects and has the ability to resolve problems quickly and efficiently by drawing on his 35 years of experience, exclusively in the field of ITS and traffic engineering. Through his current projects, Mr. Ortiz is assisting agencies to understand the Connected Vehicles and Autonomous Vehicles Markets, so they can make better decisions on current and future ITS deployments. Mr. Ortiz is a past member of the Board of the Institute of Transportation Engineers (ITE) International. Mr. Ortiz serves on the Board at ITS California.
 On-Call Traffic Engineering Services, Riverside County  On-Call Traffic Engineering Services, Desert Hot Springs  On-Call Traffic Engineering Services, San Clemente
 On-Call Traffic Engineering Services, Mission Viejo
 On-Call Traffic Engineering Services, Anaheim
 CVAG CV Sync Smart Region Program
 Citywide Engineering and Traffic Survey, Glendora
 Citywide Engineering and Traffic Survey, Rialto
 On-Call Traffic and Transportation Engineering
Services, Claremont

JOHN DORADO, PE

TRAFFIC ENGINEERING TASK LEADER
[email protected]

TRAFFIC ENGINEERING / TRANSPORTATION
PLANNING/ ENGINEERING EXPERIENCE:
 Project Management | Traffic Studies
 Parking Studies| Bus Rapid Transit Programs
 Active Transportation | Traffic Signals PS&E
 Signing/Striping
 Public Works | ITS Planning and Design
 Advanced Traffic Management Systems
 Smart Transportation Management System |
Communication network/topology

RELEVANT PROJECT EXPERIENCE

Mr. Dorado, PE has over 25 years of experience in the field of Intelligent Transportation Systems (ITS) engineering, planning and design, traffic engineering, and transportation planning. He provides a balanced understanding of projects within the public and private sectors and skillfully meets challenges and creates positive change. He has a record of success in project management, on-time, and on-budget project delivery, and has a proven ability to foster strong positive client relations. Mr.

Dorado’s professional expertise ranges from traffic engineering PS&E to traffic and transportation studies including assisting cities with plan and study review services and addressing citizen requests. Mr. Dorado also has a wide range of knowledge of various traffic control systems (TCS), Ethernet communication systems, and ITS elements. He has been involved with upgrading various citywide traffic signal systems, controllers, communication systems, and traffic management centers.  On-Call Traffic Engineering Services, Corona
 On-Call Traffic Engineering Services, Riverside County  Citywide Truck Route Study, Rialto
 On-Call Traffic Engineering Services, Newport Beach
 On-Call Traffic Engineering Services, Huntington Beach  On-Call Traffic Engineering Services, Ontario
 On-Call Traffic &Transportation Engineering
Services, Claremont
 On-Call Traffic Engineering Services, Anaheim
 On-Call Traffic Engineering Services, Mission Viejo
Years of Experience: 25
Years with ADVANTEC: 8
Civil Engineer, CA, 74405
IMSA Certified Level I and Level
II
Education:

B.S., Civil Engineering, California
State University, Fullerton
Years of Experience: 35
Years with ADVANTEC: 9
Registration:

Civil Engineer, CA, C057535
Traffic Engineer, CA, 2025
Civil Engineer, AZ, 34333
Professional Traffic Operations
Engineer, US, 426
Education:

B.S., Civil Engineering, California
State Polytechnic University,
Pomona
343

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 5 ends

JOHN COX

TRAFFIC SIGNAL SYSTEMS DESIGN &

MAINTENANCE TASK LEADER
[email protected]

TRAFFIC ENGINEERING / TRANSPORTATION
PLANNING/ ENGINEERING EXPERIENCE:
 Systems Engineer
 Traffic Engineering
 Signal Timing and Synchronization
 ITS Planning and Design
 Advanced Traffic Control (ATC)
 Adaptive Control Systems
 Advanced Traffic Management Systems
 Smart Transportation Management System
 Communication network/topology

RELEVANT PROJECT EXPERIENCE
Mr. Cox is a Systems Engineer for ADVANTEC and specializes in Intelligent Transportation Systems, Communications, Fiber Optic technologies, Closed Circuit Television, Changeable Message Signs, Wireless Broadband Ethernet, Traffic Management Center systems integration and various Advanced Traffic Management System hardware/software suites. Over 25 years of experience in the transportation industry, John has been involved in dozens of transportations and traffic engineering projects that include both design and execution of Traffic Signal, ITS, CCTV, CMS, TMS and Fiber Optic Communications having integrated and maintained such systems in support of centralized signal control deployments. Additionally, he has extensive background in the public sector, where he designed and maintained the Traffic Management Center for the City of Costa Mesa for over 10 years.
 HSIP Cycle 8 Improvements, Plam Springs
 On-Call Traffic Engineering Services, Corona
 On-Call Traffic Engineering Services, Huntington Beach  On-Call Traffic Engineering, County of Riverside
 CV Sync Smart Region Program Phase I and II, CVAG
 Citywide ITS Improvements, La Quinta
 Imperial Hwy ITS, Firestone HSIP, Pioneer HSIP,
Norwalk
 Garden Grove Boulevard RTSSP (OCTA)
 ITS and TMC Improvements, Seal Beach
 Citywide Fiber Optic Communication and Signal
System Upgrade, Lancaster

Years of Experience: 26
Years with ADVANTEC: 10
Registration:

IMSA Level II Technician
#BE-864-17 | IMSA Work Zone
Certified #AA-86417
Corning Inc. International Fiber
Systems (IFS)
Education:

Fullerton College
Engineering Technology Professional
344

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 6 ends

RELEVANT PROJECT EXPERIENCE AND REFERENCES
We have prepared the following matrix outlining similar current and recently completed projects and contracts and their associated elements of work.

PROVEN EXPERIENCE FOR EVERY MAJOR

MUNICIPAL TRAFFIC/TRANSPORTATION
PLANNING, ITS, and ENGINEERING NEEDS Traffic and Transportation Engineering Traffic Signal Improvements Transportation Planning Traffic Study Development Traffic Signal Timing ITS Design and Integration Roadway/ADA Improvements and WQMP Other Professional Services City of Huntington Beach On-Call Traffic Engineering Services
City of Irvine
On-Call Traffic Engineering Services
City of Mission Viejo
Public Works Professional Consultant Services
City of Mission Viejo Traffic Control and Safety
Analysis for Avery Pkwy and Marguerite Pkwy
City of Mission Viejo
HAWK Signal Study and Design
City of Mission Viejo
SSARP Traffic Signal Design
City of Mission Viejo
Design Services for Olympiad Rd-Felipe Rd TSSP
OCTA
Los Alisos Blvd Route RTSSP
OCTA
Garden Grove Blvd Route RTSSP
City of San Clemente
On-Call Traffic Engineering Services
City of Anaheim
On-Call Traffic Engineering Services
City of Newport Beach
On-Call Traffic Engineering Services
City of Claremont
On-Call Traffic Engineering Services
City of Pomona
On-Call Traffic Engineering Services
City of La Habra
On-Call Traffic Engineering Services
City of Lawndale
On-Call Traffic Engineering Services
City of Norwalk
Pioneer Blvd (HSIP Cycle 8) Improvements and
TSSP
Los Angeles County
On-Call Traffic Engineering Services

345

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 7 ends

Relevant Projects and References
ADVANTEC has provided similar As-Needed or On-Call Professional Consultant Services to agencies in Orange County and Los Angeles County as described on the following pages.

Project Name / Description Contact Information, Project Status, and Project Team
Citywide Traffic Signal Operations, Chino Hills, CA
ADVANTEC has provided traffic signal system monitoring and operations for City of Chino Hills, since 2009. Specific tasks include:

Reference: City of Chino Hills
Mr. Carl Hassel, Senior Engineer
(909) 364-2817
[email protected]
Date Range: 2009 to Present
Project Team: Jose Guedes, Ryan Miller, John Cox

• Central System Monitoring: Check existing signal timing, functionality of each detector, and coordination parameters at least once a week or upon request by the City, either in the field (if signal is off-line), or at our office (if signal is on-line), within 24 hours from time of request.
• Aries System Updating: Update intersection graphical displays, detectors assignments, timing-plans, etc. to ensure all information is up-to-date and provide technical support. • Signal Timing: Make minor adjustments of timing parameters, e.g. offsets, splits, timing plans, to improve and ensure traffic progression upon request by the City. Maintain signal timing charts in each cabinet and a copy submitted to the City’s Engineering Department.
• Data Management and System Communication: perform upload and download of traffic data including, but not limited to, traffic volume counts and occupancy reports, from the signal controllers. Maintain communications between master controllers and central system. • Trouble Shooting: As requested by the City, the consultant shall perform trouble shooting of a signal either in office, in the field, or both to address specifically reported problems. The consultant shall make recommendations for remediation to City staff and implement changes as approved by City staff.

ADVANTEC also performed additional services, on an as-needed basis, related to Traffic signal design and plan check, and Traffic signal construction management and inspection services.

346

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 8 ends

Project Name / Description Contact Information, Project Status, and Project Team
Public Works Professional Consultant Services, Mission
Viejo, CA - ADVANTEC is currently providing on-call traffic engineering services with the City of Mission Viejo. Under our current contract, ADVANTEC is currently working on the following three projects with the City: HAWK Signal Study and Design Project at Olympiad Road and Lake Mission Viejo
Entrance, the Traffic Control and Safety Analysis for Avery Parkway and Marguerite Parkway, and Design Services for Olympiad Road-Felipe Road Traffic Signal Synchronization Project (TSSP);
Reference: City of Mission Viejo
200 Civic Center, Mission Viejo, CA 92691
Mario Gutierrez, Traffic/Transportation Engineer
(949) 470-3068
[email protected]
Date Range: 2018 to Present
Project Team: John Dorado, Jonathan Delgado,
Jose Guedes, John Cox, Ryan Miller, Bryan Elenes,
Madeleine Ortiz, Nicholas Park, Rachel Tam,
Robert Steaffens, Frank Gomez.

HAWK Signal Study and Design Project at Olympiad Road – ADVANTEC provided a supplemental crosswalk assessment report for this intersection to determine if a HAWK signal was warranted. The purpose is to improve the safety, accessibility, and visibility of pedestrians and bicyclists that are crossing Olympiad Road. This included reviewing sight distance visibility constraints and conceptual plans. Based on our results, the HAWK signal was warranted, and the City approved the next phase, preparation of PS&E.

ADVANTEC has prepared plans, specifications, and estimates which is currently in-progress. The project improvements include a new HAWK signal, high visibility crosswalk and striping, ADA ramp improvements, and a link to the City's fiber optic communications network.

Traffic Control and Safety Analysis for Avery Parkway and Marguerite Parkway – ADVANTEC prepared a Traffic Control and Safety Analysis for Avery Parkway and Marguerite Parkway. ADVANTEC conducted traffic control analyses at two intersections along Avery Parkway and safety analyses at five intersections along Marguerite Parkway. The study includes a summary of existing conditions, analysis methodologies, traffic data collection, line of sight analysis, traffic signal and all-way stop warrants, and recommendation including cost estimates.

Design Services for Olympiad Road-Felipe Road Project P TSSP – ADVANTEC is responsible for preparing plans, specifications, and estimates (PS&E) for new traffic signal controllers, closed circuit television (CCTV) cameras, emergency vehicle pre- emptions systems, fiber optic communications, and other associated traffic signal and ITS equipment upgrades. ADVANTEC is also responsible for preparation of new traffic signal timing, and signal coordination plans. This includes analyzing current signal timing parameters and updating them to the latest CA MUTCD requirements.

ADVANTEC will assist the City with implementation, observations, and fine-tuning of new signal synchronization. Construction support services will be provided, along with a final project report and providing operations, maintenance, and monitoring support for two years after implementation of the signal timing along the project corridor. 347

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 9 ends

Project Name / Description Contact Information, Project Status, and Project Team
On-Call Traffic Engineering Services – Huntington Beach, CA As part of our on-call traffic engineering contract, ADVANTEC provided Systems Engineering and design services (PS&E) for various projects in the City of Huntington Beach. The projects included ITS upgrades at these locations: 1) City Hall to the downtown area and City building and facilities, 2) Oak View Community Center and City Well Site, 3) City Hall to Utility Yard, and Garfield Avenue. Other projects included:
 Traffic Signal Upgrades along
Garfield Avenue (3 locations)
 Signing and Striping for 9
corridors - Bike lanes and active
transportation Improvements.

Reference: City of Huntington Beach
2000 Main Street Huntington Beach, CA 92648
William F. Janusz, PE, PTOE, Principal Engineer
(714) 374-1628
[email protected]
Date Range: 2020 to Present
Project Team: Carlos Ortiz, John Dorado, Jose
Guedes, John Cox, Rob Steaffens, Madeleine Ortiz,
Frank Gomez, Nicholas Park
Fiber Optic Communications and ITS Improvements – As part of our on-call traffic engineering contract, ADVANTEC provided fiber optic communications and ITS design services (PS&E) to ensure network improvements are compatible expandable and scalable for the City’s traffic management and monitoring systems, and for the City’s Information Technology (IT) network. This includes fiber assignments and management, connectivity and setup of virtual local area networks (VLAN), and internet protocol (IP) addressing. This configuration virtually separates data/video from the traffic and ITS infrastructure, and the data/information/video from City’s buildings and facilities. Strategies were also implemented for cyber security and redundant communications. This required close coordination with the City’s IT staff and building department during the design, and network development stages.

Signing and Striping – ADVANTEC provided professional engineering services to design and prepare signing and striping plans for nine (9) segments in the City of Huntington Beach. Plans were prepared as part of a roadway improvements project for 4.65 miles (24,600 feet). The striping improvements included restriping travel lanes, medians, turn pockets, bike lanes, crosswalks, pavement markings, parking lanes, and include the removal or addition of red curb parking restrictions. Additional signage was also proposed as needed. The plans were prepared per the California Manual on Unifor Traffic Control Devices (CA MUTCD) Caltrans Standard Plans, American with Disabilities Act (ADA) requirements, and City Standard Drawings. 348

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 10 ends

Project Name / Description Contact Information, Project Status, and Project Team
On-Call Traffic Engineering, Anaheim, CA
- ADVANTEC has been providing on-call
traffic engineering assistance to City of
Anaheim for the past 16 years.

ADVANTEC prepared engineering plans,
specifications, and estimates (PS&E) for
traffic signal upgrade, fiber optic communications
interconnect and traffic control plans, controllers and cabinets upgrade for various major corridors within the City.

Detailed design for CCTV cameras includes the design of poles and foundations, video control equipment, and
interconnect to the communications hub.

Reference: City of Anaheim
200 S. Anaheim Blvd, Anaheim, CA 92805
Rafael Cobian, PE, Traffic Engineer
(714) 765-4991
[email protected]
Date Range: 2008 to Present
Project Team: Carlos Ortiz, John Dorado, Armando
Solis, Jose Guedes, John Cox, Jonathan Delgado,
Frank Gomez.

On-Call Traffic Engineering Services, City of Claremont:

ADVANTEC has provided the City of Claremont with On-Call Traffic Engineering Services since 2015.

We have completed several
task orders, including:

Reference: City of Claremont
207 Harvard Ave N, Claremont, CA 91711
Mr. Vince Ramos, Associate Engineer
(909) 399-5395
[email protected]
Date Range: 2015 to Present
Project Team: Carlos Ortiz, John Dorado, Jose
Guedes, John Cox, Madeleine Ortiz, Ryan Miller,
Frank Gomez, Nicholas Park, Dylan Sison.

Corridor / Intersection Studies – Prepared studies for several roadway segments to address issues and concerns from the residents to enhance safety related to existing roadway features including line-of-sight, level-of-service, queuing, signing, striping, bicycle safety, speeding, traffic calming and safety enhancements and all-way stop and signal warrants.

Citywide Speed Survey – Prepared a citywide speed survey, in order to review, establish, and re-certify posted speed limits on 54 roadway segments throughout the City.

Intersection/Roadway, Traffic Signal and Signing/Striping (PS&E) – Prepared (PS&E) related to the project improvements for multiple intersections Citywide. Improvements included left turn phasing, controller upgrades, pedestrian and vehicle heads, APS push buttons, detection systems and signal timing plans (lead pedestrian interval).

ADA Ramp Improvements – Prepared ADA ramps and bulb-outs Citywide Neighborhood Traffic Calming Program and Policy – Developed a program to provide guidance, procedures, standard practice, and policies for response to common citizen requests. Includes a “toolbox” that can be used to address neighborhood traffic-related concerns such as: speeding vehicles, high traffic volumes, cut-through traffic, or safety concerns.

All-way Stop Warrant and Traffic Signal Analysis – Prepared these studies at several intersections using the latest California Manual on Uniform Traffic Control Devices (CA MUTCD). Based on our evaluation, recommendations are provided.
349

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 11 ends

Project Name / Description Contact Information, Project Status, and Project Team
On-Call Traffic Engineering Services – Los Angeles County, CA - ADVANTEC’s work over this period consisted of several traffic signal design projects including 8 major corridors ranging from 9 to 62 intersections with associated
improvements. All the plans were designed in conformance with the County of Los Angeles
latest design guidelines, using
Microstation/AutoCAD formats.

Plans were submitted in 3
different stages: 80%, 100% and
final design submittal. The 100%
and final design plans were also
submitted to the involved local
agencies for review and approval.

Reference: LA County Dept. of Public Works
900 S. Fremont Ave. Alhambra, CA 91803
Marty Amundson, Supervising Engineer
(626) 300-4774
[email protected]
Date Range: 2004 to Present
Project Team: Carlos Ortiz, John Dorado, Armando
Solis, David Madera, Kevin Acuña, Sudarshan
Chalan.

On-Call Traffic Engineering
Services, City of Lawndale:

ADVANTEC has been providing
the City of Lawndale with On-
Call Traffic Engineering
Services since 2023. We have
completed several task orders,
including:

Reference: City of Lawndale
4722 Manhattan Beach Blvd, Lawndale, CA 90260
Mr. Nick Petrevski, Associate Engineer
(310) 973-3265
[email protected]
Date Range: 2023 to Present
Project Team: Carlos Ortiz, John Dorado,
Madeleine Ortiz, Nicholas Park.

Corridor / Intersection Studies – Prepared studies for two (2) roadway segments to address issues and concerns from the residents to enhance safety related to existing roadway features including line-of-sight, level-of-service, queuing, signing, striping, bicycle safety, speeding, traffic calming and safety enhancements and all-way stop and signal warrants.

All-way Stop Warrant and Traffic Signal Analysis – Prepared these studies for several intersections using the latest California Manual on Uniform Traffic Control Devices (CAMUTCD). Based on our evaluation, recommendations are provided.

Parking Study – Prepared a parking study for several roadway segments in order to recommend strategies on how to increase the amount of available parking.

350

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 12 ends

PROJECT UNDERSTANDING AND APPROACH
Project Understanding
The City of Placentia would like to contract with professional engineering firms to provide on-call traffic engineering services. The City is looking for firms with outstanding reputation, capacity, knowledge and proven track record to assist with traffic engineering and traffic signal operation management task for a period of three years, and one potential two-year extension.

The City of Placentia is home to over 50,000 residents, and it is located in northern Orange County, bound by State Routes 57, 91 and Imperial Highway. The City currently operates and maintains 63 traffic signals, and three flashing beacons. Placentia’s signal system includes Econolite Centracs Advanced Traffic Management System (ATMS), Econolite controllers (Cobalt, ASC/3, ASC/2), and a signal communication network that includes both copper interconnect and fiber optic cables. The City has participated in many regional traffic signal synchronization projects led by OCTA and neighboring cities, including Orangethorpe Avenue, Yorba Linda Boulevard, Rose Drive, Bastanchury Road, and Kraemer Boulevard.

ADVANTEC will use our extensive traffic engineering, ITS, traffic signal timing and synchronization, active transportation, planning, design, and implementation experience to assist the City as-needed. We are a full service team that will act as extension of staff from start to completion of every task order.

Project Management Work Plan Process and Methodology
Our Project Manager, Mr. Jose Guedes, TE, and key task leaders are intended to serve in their respective roles throughout the duration of the agreement. ADVANTEC has significant experience working on simultaneous tasks for clients under as-needed contracts and on multiple tasks associated with larger projects. This is the nature of our business, and Mr. Guedes has demonstrated his ability to manage and maintain budgets and schedules working on concurrent projects. Mr. Guedes will be the primary point of contact for the City. He will be supported by experienced California registered Civil and Traffic Engineers and other qualified professionals capable of managing day-to-day tasks under this contract.

Typical Project Methodology
ADVANTEC’s approach providing professional
consultant services is based on years of
project experience completing On-Call Traffic
Engineering Services for public agencies
across California. Through this experience we
have developed a logical, efficient approach
that blends basic principles of traffic,
transportation, and civil engineering with our
fresh, creative thought process. Our
methodology approach will provide us with
cost control measurements, development of
quality products, and ability to meet the task
order or project schedule. In addition, our
methodology approach provides the entire
team with our communication, cooperation,
commitment, responsiveness, and
requirement process on each project or task order. The graphic on the previous page illustrates our process once a task order is requested. One key element to our success is communication with the City’s Project Manager from task order beginning to end to make sure that the City stays current on design issues. We understand the importance of responding quickly so that accurate decisions can be made. Recognizing that each project will 351

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 13 ends

develop its own challenges and unique tasks based on location, and that the breadth of study area and design issues will vary from project to project, we generally follow a similar approach when initiating a project task:
1) Understand the City‘s Goals: In order to be successful on any project, it is vital that the Project Manager and Task Leaders understand the final product. We will meet with City staff to learn what the important issues are on each task order. We will understand the budget, schedule, and scope of work before planning the project so that we can begin to formulate a detailed scope of work and identify critical path issues. 2) Prepare a Detailed Work Plan: We will define all project tasks, their relationship with one another, and their associated time frame for completion. We will develop a list of needs so that we can identify specialized expertise that may be required to maintain schedule and complete tasks. Budgets will be established for each task to ensure that the project team stays on track. We will provide City staff with a detailed Project Schedule.

In addition, we will provide the City with our Project Management Plan, Quality Control/Quality Assurance Plan, and Resource Plan.

Project Execution
Following notice to proceed, we will coordinate resources, oversee the completion of technical tasks, and keep the project team and stakeholders informed of the project’s status and any new findings. Our Project Manager will continuously monitor the project’s progress, budget, and schedule to identify areas requiring attention. Virtual meetings will be held with the City’s project manager and key stakeholders on a monthly basis to identify issues early and keep everyone informed of the project’s status. ADVANTEC uses various project management tools that will give all team members and City staff access to archived deliverables, milestone schedules, to-do lists, and a history of project communications — further fostering a collaborative working environment.

Final Project Delivery and Closeout
As each project or task order ends, the Task Leaders will confirm that all final deliverables have been provided.

These include all digital files and hard copies in the City’s preferred format. Final invoices will be processed quickly to facilitate contract administration.

Experience Working with Concurrent Task Assignments
ADVANTEC takes
great pride in our
long-standing
history of providing
both as needed and
extension of staff
services for public
sector clients. In
Southern California,
we have provided
these services for
the Cities of
Huntington Beach,
Irvine, Mission Viejo, San Clemente, Anaheim, Newport Beach, Laguna Beach, Claremont, Pomona, Diamond Bar, Long Beach, Lawndale, County of Los Angeles, OCTA, and Caltrans, as well as several other public agencies throughout California. Our staff is accustomed to meeting demanding project schedules by pooling our resources from skilled staff throughout the region, when necessary, to ensure our clients are provided the highest quality of service and on-time performance. We balance our workload, availability, and deliverables on a weekly basis. Our 352

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 14 ends

key personnel and support staff have similar management, planning and design experience; therefore, we are able to work on concurrent tasks, and have the flexibility to bring other staff together to meet project deliverables.

Innovative Approaches
A strong project management and communication plan is critical to contract/project success. Providing access to the right team at the right time is essential to any on-call contract. Through experience on other on-call contracts, we will provide seamless execution on each and every project or task order. Our project management communication plan establishes the chain of command for the team involved in any and all task orders, providing well-defined roles and responsibilities. Our Project Manager, Mr. Jose Guedes, TE, is the single point of contact for all task order initiation and contract discussions. The Entire Team is Highly Experienced in On-Call and Task Order- Driven Contracts. We understand the need to be responsive to the requirements of such contracts with fast mobilization, as demonstrated through our ability to complete task orders through previous On-Call Contracts with other agencies.

To ensure fast response with the right resources on task orders, our project manager will meet regularly with City staff to discuss upcoming projects or tasks that may require consulting services through this contract. Upon issuance of a task order, our Project Manager and selected ADVANTEC Team members will meet with the responsible City’s personnel to define the project scope. A detailed work plan will then be developed by the ADVANTEC team, reviewed, negotiated, and approved by the contract and/or project managers. This establishes the work parameters and defines the scope of work, schedule, budget, and deliverables for each task order.

As part of the project management plan, we ensure our deliverables are of the highest quality before being submitted to the City. They must initially pass our internal quality review process which consists of a series of separate internal reviews before any project deliverable is provided for review to a Client. Following the City’s review, the comments are addressed, and the process is repeated. ADVANTEC’s internal program to track progress, maintain quality control, and schedule are led and orchestrated by the Project Manager with all project personnel participating directly in the process as independent reviewers.

Internet Based Tools and Project Management Software
ADVANTEC utilizes the Microsoft Suite of software including OneDrive which provides online access for all software that we typically utilize, such as Outlook for email, Word, Excel, PowerPoint, others. We also use Ajera for project management and accounting software to track tasks and budgets.

In addition, ADVANTEC's latest strategy to maintain coordination, task order status, and deliverables is to create and maintain a file-sharing portal to be used for project correspondence, file transfer and repository, and schedule management. This helps all staff internally and provides a singular location where the City can go to find status on all task orders, action items, deliverables, outstanding items, schedule, and next steps. We are currently using Microsoft Teams on similar projects, which has been effective. We will discuss this platform and our options with the City prior to implementation.

Solutions to Similar Projects
It is anticipated that under this On-Call contract, ADVANTEC will provide professional services as indicated in the RFP including, but not limited to, the following items listed below. The table below highlights our experience, approach, preparation, and solutions to deliver specific project assignments or Task Orders that is anticipated under this contract.

353

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 15 ends

Requested
Scope of
Services
ADVANTEC's Experience and Approach to Perform the Work
Traffic/
Transportation
Engineering
ADVANTEC will prepare PS&E for all traffic/transportation engineering related projects, such as Street Lighting, Signing and Striping, and Traffic Control including assistance with construction support and preparation of as-built drawings. Our Project Manager and some of our Task Leaders have worked on the design of multiple projects throughout Orange County and Los Angeles County including roadway and intersection improvements. ADVANTEC understands the latest standards per the City, CA MUTCD, ADA, and Caltrans and will apply as required to all related projects Traffic Signal
Improvements
ADVANTEC will prepare PS&E related to the project improvements. The project plans will include a title sheet and traffic signal design or modification plans. The traffic signal plans will include all base mapping, as-built information and utilities, and all existing and proposed traffic signal poles and equipment, communication infrastructure, battery backup systems, signal heads, pedestrian heads, video detection cameras, detection, pole schedules, conductor schedules, construction notes, and any details necessary to facilitate the installation and construction of the project improvements.

ADVANTEC understands the latest standards per the City, CA MUTCD, ADA, and Caltrans and will apply as required to all related projects.

Traffic/
Transportation
Engineering
ADVANTEC will prepare PS&E for all traffic/transportation engineering related projects, such as Street Lighting, Signing and Striping, and Traffic Control including assistance with construction support and preparation of as-built drawings. Our Project Manager and some of our Task Leaders have worked on the design of multiple projects throughout Orange County and Los Angeles County including roadway and intersection improvements. ADVANTEC understands the latest standards per the City, CA MUTCD, ADA, and Caltrans and will apply as required to all related projects Transportation
Planning
ADVANTEC has performed transportation planning services for various projects, including active transportation, road diets, alternative lane configurations, preliminary intersection design, and Safe Routes to School Master Plans. ADVANTEC will work with the City to achieve their Mobility Element goals as outlined in the City General Plan. These objectives include increasing pedestrian and multimodal mobility options, coordinating with OCTA, improving air quality, and decreasing the environmental impacts of vehicular travel. We will also develop traffic models such as Synchro to conduct traffic capacity and LOS analysis at intersections and street segments including other software, as necessary. For planning studies, they will be prepared in report format with supporting exhibits, graphics, and tables.

Traffic Study
Development
ADVANTEC will provide traffic engineering studies, which summarize: the existing and proposed conditions, references requirements and assumptions, intersection, roadway, and circulation analysis, and recommendations. Supporting technical data and graphical illustrations will be included in the reports. ADVANTEC has the experience to provide the City with different types of traffic engineering analysis and reports; including accident analysis, delay analysis, lane storage capacity, roadway and intersection level-of-service, vehicle and pedestrian circulation analysis, parking studies, truck studies, traffic studies, before and after travel demand, engineering and speed survey, sight distance analysis, line-of sight analysis, queuing analysis, Traffic Signal Warrant, All-Way Stop Warrant, Left-Turn Phasing Studies, conceptual design, and active transportation improvements. 354

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 16 ends

Requested
Scope of
Services
ADVANTEC's Experience and Approach to Perform the Work
Traffic Signal
Timing
ADVANTEC will prepare traffic signal timing plans for both existing and new timings at all of the intersections operated and maintained by the City. If existing signal timing plans need to be updated, ADVANTEC is well versed in preparing new signal timing plans that include minimum green time, walk times and flashing don’t walk times based on pedestrian crossing distance and speed, yellow times, all-red times, and detection parameters. As part of traffic signal coordination, ADVANTEC will improve traffic progression and minimize travel delay to the public. We have performed this role both as traditional consultants (collect data/prepare theoretical optimized timing/implement/fine tune) and as system operators (continuously monitor system operations and implement changes as needed to accommodate revised traffic conditions). This extends to preparing traffic signal coordination timing plans on various corridors, citywide, and regionwide. We have worked on various signal coordination projects for both OCTA (Garden Grove Blvd RTSSP and Los Alisos Blvd RTSSP), and local agencies like Lake Forest, Mission Viejo, Irvine, and Costa Mesa.

Intelligent
Transportation
Systems (ITS)
Planning,
Design, and
Integration
ADVANTEC has extensive experience in the preparation of PS&E for ITS upgrades and fiber optic communication. This includes upgrading signal controllers, ethernet switches, IP addressing, fiber optic splicing assignment plans, hub cabinet installation and design, CCTV cameras, video detection, wireless communication, changeable message signs (CMS), and fiber optic cable. Our Systems Engineer, John Cox, has the experience and will take the lead with the planning, design, implementation, and system integration. He understands various traffic signal and ITS hardware, software, and overall communication networks including IP address, VLANs, fiber optic routing, fiber optic assignments, and network equipment.

In addition to the requested scope of services, ADVANTEC brings a structured team with various areas of expertise that could assist the City of Placentia from other traffic engineering related services to civil engineering/drainage services.

ADVANTEC’s Experience with State and Federally Funded Projects The ADVANTEC Team has extensive knowledge, understanding, and experience with state and federal funded projects. ADVANTEC’s staff maintains an on-going dialogue with local, regional, and state jurisdictional agencies and continually keeps abreast of the changing requirements and procedures of the Federal, State, and local agencies. The following summarizes ADVANTEC's understanding and experience with City, County, State and Federal Requirements, which benefits the City by having a firm that can implement and assist with various processes from state and federal funds to the latest trends and requirements for planning, design and implementation of smart mobility and transportation technologies.

Caltrans District Local Assistance Engineer (DLAE) and the Federal Highway Administration - ADVANTEC has extensive experience in completing and processing the numerous federal funding authorization forms through the Caltrans District Local Assistance Engineer (DLAE) and the Federal Highway Administration, as well as incorporating all required special provisions in the project specifications to ensure that federal funding is not jeopardized.

ADVANTEC has performed this task for several cities and agencies throughout Southern California. ADVANTEC has developed a comprehensive table summarizing the various authorization forms required in a matrix format that can be used to clearly identify the steps to be followed and the responsible parties. Typical procedures for processing forms with DLAE are summarized in the following table:

355

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 17 ends

Requirements Typical Process to Secure Approvals
Caltrans Request for
Authorization
Forms/Clearances
As required with the HSIP funding, certain forms are needed for the processing of the required Request for Authorization (RFA) forms. ADVANTEC will prepare and process the needed Forms with Caltrans Local Assistance.
 RFA for R/W
Acquisition
Forms
ADVANTEC will prepare and process the necessary forms with Caltrans Local Assistance the Request for Authorization to Proceed with Construction (E-76) with Caltrans Local Assistance. Once the PS&E are completed, the Request to Proceed with Construction (E-76) forms can be prepared. The Request for Authorization to Proceed with Construction forms include: 1) Cover Page/Checklist (Exhibit 3-D), 2) Request for Construction Authorization Data Sheet, 3) Completed Finance Letter, 4) Completed Field Review Form, 5) Environmental Documentation, 6) Right-of–way Certification, 7) PS&E Package and Certification, 8) Local Agency Construction Contract Administration Checklist.  RFA for
Construction
Forms
 Caltrans
Invoicing
ADVANTEC will prepare and process the necessary forms with Caltrans Local Assistance the Request for Authorization to Proceed with Construction (E-76) with Caltrans Local Assistance. Once the plans and specifications are completed, the Request to Proceed with Construction (E-76) forms can be prepared.

Caltrans Bid Award
/Project Completion
Packages
After the bid award and upon the completion construction of the project, ADVANTEC will prepare and process the Caltrans forms.
 Bid Award
Package
Upon the bid award of the project, ADVANTEC will prepare and process the Bid Award Package with Caltrans Local Assistance. The Bid Award Package to Caltrans includes but not limited to: 1) Cover Page/Construction Contract Administration Checklist (Exhibit 15-A), 2) Local Agency Bid Opening Checklist, 3) Updated Finance Letter, 4) Detail Estimate and Detail Estimate Summary, 5) DBE Certifications (from Contractors), 6) Contract Award Checklist, 7) RE’s Checklist.  Project
Completion
Package
After the construction of the project, ADVANTEC will prepare and process the Project Completion Forms with Caltrans Local Assistance. This is an important task in the project to ensure reimbursement by Caltrans of the construction payments. The Final Completion Package to Caltrans includes but not limited to: 1) Cover Page/Expenditures Checklist (Exhibit 17-D), 2) Final Finance Letter, 3) Final Detail Estimate and Detail Estimate Summary, 4) Change Order Summary, 5) Final DBE Certifications (from Contractors), 6) Materials Certifications, 7) Final Inspection Form.

For any proposed work that will directly impact state highway facilities and require a Caltrans encroachment permit, ADVANTEC’s extensive track record working with Caltrans on numerous state highway projects will help facilitate the process. ADVANTEC’s staff maintains an on-going dialogue with local, regional, and state jurisdictional agencies and continually keeps abreast of the changing requirements and procedures of the Federal, State, and local agencies.

ADVANTEC’s Efforts to Achieve Client Satisfaction
The ADVANTEC Team’s Quality Assurance (QA)/Quality Control (QC) Plan Program is a continuous process used not just at project milestones, but also on a daily basis as workflows from desk to desk, discipline to discipline and consultant to client. Our Project Manager and task leaders will oversee their staff on a daily basis. We will identify key contacts for ease of inquiries regarding project status. Mr. Guedes will work with the management and implementation of our QA/QC plan. A sampling of these policies and procedures is identified below.

Policy Approach
Defined roles and responsibilities of key
staff
 Specify individual responsibilities for each of the positions in the QA/QC organization structure; QA/QC training for all project staff holds overall team QA/QC kick off meeting to review QA/QC plan and expectations.

Dissemination and retention of pertinent
reference information
 Establish process for flow of project documentation to key staff and document control procedures (e.g., scope of work, invoice/progress reporting, meeting minutes/action items, deliverables, etc.). 356

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 18 ends

Policy Approach
Expectations of internal/external Project
Team and design interface meetings
 Develop consistent meeting minutes, action item tracking, and issue resolution log format.

Expectations for regular “over the shoulder”
reviews by Discipline/Task Manager
 Define protocols for continuous review process during plan/document preparation to ensure multiple discipline involvement.

Inter-disciplinary coordination and shared
work elements
 Establish weekly or biweekly planning and design meetings. Inter- disciplinary exchange of plans prior to milestone submittals for joint review ensuring plan and work consistency.

Milestone checking of calculations, reports,
and plans
 Assign qualified, experienced independent review staff.  Perform checking, revisions and back checking in a coordinated manner considering standards, project scope, technical accuracy, format, presentation, and previous review comments.

Quality Control Review Checklists  Require all design disciplines to implement pertinent checklists in the preparation of project deliverables.

Our Ability to Meet Project Schedule and Budgets
Project controls provide the critical information needed to manage a Project or Task Order through to completion on schedule and to ensure that projects or task orders are completed within budget. The following project control measurements are used by our Project Manager and Task Leaders.

S CHEDULE C ONTROL - We understand the importance of a project schedule as a critical tool in the management of a project. There are several key elements that maximize the effectiveness of our Microsoft project schedule including:
 Information should be easily communicated and understood;  Commitment is obtained from each functional leader and the project team;  Inter-relationship of tasks is shown, including internal QC/QA and agency review periods;  Easy and flexible to update; and
 Office wide correlations of staffing and project commitments are considered.

Specific critical path items or key critical decisions that affect project deliverables will be identified on a continual basis to ensure the project schedule is met. We will promptly notify the City of any changes in anticipated project progress. This approach also allows the City to schedule staffing for their reviews in advance and avoid any rescheduling that would delay other projects.

B UDGET C ONTROL - The project scope of work will serve as the basis for the development of work breakdown structure (WBS) and the project schedule. A budget expressed in hours and dollars will be established for each task and subtask in our project cost accounting system (Ajera). Our Project Manager and ADVANTEC’s Task Leaders have real-time access to this cost data from his desktop computer enabling continuous monitoring of project costs. The WBS budget and schedule will be combined into a time phased budget to allow for measuring progress and comparing planned versus actual expenditures. Earned values will be computed for all activities and assessment of budgeted cost of work scheduled, budgeted cost of work performed, actual cost of work performed and estimates to complete will be developed. This data will be reviewed with our key task leaders to allow for continuous monitoring, identify early warnings of budget or schedule issues and develop required corrective actions to mitigate any potential schedule delays. A complete Monthly Progress Report will be prepared aligned with each task order and will describe work completed that period, work to be completed in the subsequent period and identification of significant schedule or cost matters that are of critical nature.

357

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 19 ends

Ability to Manage and Draw Upon Multi-Disciplinary Staff to Address Requested Services The ADVANTEC Team's management approach has been proven on past similar On-Call Services to be effective in meeting or exceeding client goals for completing assigned projects on or ahead of schedule and within or below budget. Comprehensive work planning and developing a proactive project team relationship will be critical to the successful management and delivery of this project. The figure below illustrates our project organization and task order request process with the City, our project team, and key personnel. Key elements of ADVANTEC’s management approach include the following:

U NDERSTANDING C ITY’S O BJECTIVES
– Prior to initiating our efforts, the
ADVANTEC Team will have a thorough
understanding of the City’s objectives in
order to successfully meet the project
milestones. Our Project Director, Project
Manager, and Task Leaders will work closely
with the City to identify specific goals,
objectives, and critical issues. Based on the
requested service, ADVANTEC will
coordinate with our staff, key personnel,
and subcontractors to determine the
required discipline(s) to complete the
task(s).

C OMMITMENT TO P ROVIDE
R ESOURCES – ADVANTEC is committed to
providing our Key Staff and Support Staff as
indicated in our Organizational Chart. Our
Team has the ability and expertise to
perform the proposed work within the time
limits of the project, considering their
current and projected workload and
assignments. Our senior management
Team meets weekly to discuss projects and
number of hours assigned to each of our
staff and to ensure our deliverables are
submitted on time and in some cases, if we
need to expedite the deliverables. The
proposed key team members are intended
to serve in their respective roles
throughout the duration of the agreement.

C RITICAL P ATH M ETHOD S CHEDULING
– On a monthly basis, our Project Manager will submit an updated four-week horizon schedule reflecting planned work. Our Project Manager will promptly notify the City’s Project Manager of any changes in anticipated project progress and will submit an updated detailed Project Schedule to the City. Specific critical path items or key critical decisions that may affect the project will be identified on a continual basis to ensure the project schedule is met.

This approach also allows the City to schedule staffing for its reviews in advance and avoid any rescheduling that would delay other projects.

Determine Service Type and Coordinate with Task Leaders Carlos Ortiz, PE, TE, PTOE
City Review and Approval
Traffic Signal Operation Management

PROJECT MANAGER
Jose Guedes, TE
Task Order Request

DEFINE SCOPE, DELIVERABLES, AND FEES
Project definition, research and investigation
Detailed scope of services
Identify deliverables
Define project schedule with properly sequenced task
Define budget per task
Obtain buy-in from Fountain Valley and Task Leads at all levels Align scope with firm expertise with logical responsibility Establish Project Team
Coordinate availability and duration of services

TASK ORDER EXECUTION
Kick-off Meeting
Determine stakeholders
Develop project procedures and expectations
for technical interface of firms
Provide regular over the shoulder oversight
and technical leadership
Create an environment of collaboration
for project team and agency members
Set up monthly meetings
Provide deliverables on-time within
budget

PROJECT DIRECTOR
Jose Guedes, TE –Task Leader
Ryan Miller –Project Engineer
Traffic Engineering
John Dorado, PE –Task Leader
Maddie Ortiz –Project Engineer
358

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 20 ends

SCOPE OF WORK
ADVANTEC will provide both, Traffic Engineering and Traffic Signal Operation Management Services as defined in the RFP.

Traffic Signal Operation Management
ADVANTEC will provide traffic signal operations and monitoring services by accessing the City’s Advanced Traffic Management System (ATMS) or through field investigation, as appropriate for each activity. The services will be provided by our highly experienced engineers and Signal Systems Engineer (IMSA Level II).

Monitoring of the City’s traffic signal systems will include the following tasks:
• Manage day-to-day traffic signal operations, systems and performance of the City’s traffic signal- controlled intersections, as shown in Attachment A, and various ancillary devices. • Monitor and review data daily to verify that all traffic signals are working properly. • Monitor systems logs to identify potential operational issues ADVANTEC will monitor the City’s signals, on a daily basis, by remotely accessing the ATMS. ADVANTEC will work with the City’s IT Department to establish remote access by setting up Virtual Private Network (VPN) connection or other remote software, from our own offices and workstations. We will program ATMS to automatically perform a variety of maintenance tasks and create event logs, and to gather and store data daily. ADVANTEC will set up the ATMS Scheduler to automatically gather and store controller data, communication logs, alarms and error messages. The data will be reviewed to verify that all traffic signals are working properly. Any logged malfunctions will be immediately reported to the City's traffic signal maintenance contractor. We will also verify if signal timing stored in the ATMS is programmed correctly in each controller. ADVANTEC staff will field-verify operational issues identified through system feedback when necessary. ADVANTEC system engineers (IMSA certified) will troubleshoot any operational problems that occur with focus on safety, system integration, and performance.

ADVANTEC staff has over 25 years of experience with all controller manufacturers, including Econolite’s ASC/2, ASC/3 and Cobalt controllers utilized by the City, and the CENTRACS ATMS software. ADVANTEC staff has previously completed a regional project in San Bernardino County in which we monitored the signal system of 10 separate cities with different central systems. Our staff has experience managing small, medium, and large systems (Chino Hills – 51 signals, Costa Mesa – 150 signals, City of Irvine – 330 signals). • Report all traffic signal problems and malfunctions to the City within 24 hours • Coordinate maintenance activities with City’s maintenance contractor and Transportation Manager.

ADVANTEC staff will report all traffic signal problems to City’s signal maintenance contractor as soon as detected and no later than 24 hours. We will coordinate all maintenance work with City’s maintenance supervisor and City's traffic signal contractor and follow-up with completed work. ADVANTEC will maintain a log of all issues with traffic signal equipment and actions taken. Our Systems Engineer has more than 20 years of experience working with City staff and signal maintenance contractors and personally know many of the supervisors and technicians. This knowledge and relationship allow ADVANTEC to work seamlessly with maintenance contractors.
359

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 21 ends

• Connect to and provide traffic signal input into system controllers manually and/or from the Consultant’s office, including designing and installing special custom traffic signal operational circuity and maintaining signal interconnect operations.

ADVANTEC staff has experience with various traffic signal controller manufacturers (Econolite, McCain, Siemens, QFree/Intelight, and Trafficware) and can perform signal timing programming at many levels, including: timing input into signal system controllers manually or remotely from our offices, and designing and installing special signal operational logic (circuitry). Our staff is also expert in troubleshooting communications issues and maintaining signal interconnect operations. We have experience monitoring small- and large-scale systems, such as a region-wide monitoring project of 500 intersections where we identified and resolved traffic signal communications issues involving signal interconnect, wireless radios, cell modems, and Ethernet devices. • Coordinate with the Transportation Manager to investigate and respond to citizen and stakeholder requests or concerns related to traffic signal operations.

ADVANTEC staff will assist the City in resolving traffic signal related complaints by speaking directly to residents or City staff on their specific requests. Mr. Guedes has 20 years of experience in City government, and especially responding to citizen’s traffic signal concerns. We will perform the necessary investigation, including field observation, and make recommendations to the City. Recommendations could include new coordinated signal timing, modified signal phasing, equipment upgrades, or timing adjustments. • Investigate and make recommendations on traffic signal improvements, such as any new coordinated signal control systems, more efficient signal phasing, equipment upgrades and significant timing adjustments.

ADVANTEC has amassed a wealth of knowledge and experience on the latest technologies being used in traffic operations and management as a result of the extensive technology assessments and deployments performed during our most recent projects. Our team of engineers and IMSA certified technicians will assist the City to review, integrate, and inspect the design, construction, and implementation of all traffic related technologies.

ADVANTEC has assisted several cities to select and implement new state-of-the-practice ATMS and controllers, like San Clemente (Intelight MaxView), Lancaster (Intelight MaxView) and Culver City (Transparity Adaptive). We have also completed the design for a new region-wide system in Coachella Valley (Riverside County) that will implement new ATMS and controllers (QFree Kinetic Mobility, and ATC w/ MaxTime). • Monitor system coordination along key corridors and refine in response to changing traffic patterns or other requirements to ensure the most efficient signal progression.

ADVANTEC will drive each coordinated corridor
during all peak periods, every three months to verify
and fine-tune coordination timing. We will conduct
“floating vehicle” surveys using a GPS-based
software to collect the travel data and generate
reports. If necessary, we will revise, implement, and
adjust synchronization for improvement of traffic
progression, and develop modified coordination
timing to be deployed during any construction along
360

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 22 ends

the major corridors.
• Meet as necessary with the Transportation Manager to discuss issues and/or activities potentially affecting City traffic signal operations such as private development or City capital improvement projects.

Upon City’s request, ADVANTEC will meet with City Engineer and Traffic Engineer and assist resolving any issues that may affect traffic signal operations, such as private development or City’s construction projects. ADVANTEC staff has experience with developing and monitoring signal timing for construction traffic detour and has been successful working with multiple jurisdictions and Caltrans. • Review the results of corridor traffic signal coordination studies and provide input regarding recommended equipment, traffic signal coordination parameters, etc. as necessary. • Coordinate with other local agencies on major coordination projects. • Analyze historical data to identify volumes and patterns in order to assist in determining necessary signal timing adjustments.

ADVANTEC staff will assist the City in reviewing
Traffic Signal Coordination Studies, and will provide
recommendations on equipment upgrades, and
timing parameters. We will review Synchro files,
Tru -traffic files, timing sheets, and any other data as necessary to provide our recommendation. We will
work with adjacent cities on cross-jurisdictional
synchronization studies by coordinating review and
implementation of timing and making sure the
coordination timing in the City of Placentia is preserved or enhanced. We will also review traffic count data and compare to historical data to identify changes in traffic volumes and patterns to determine if adjustments to signal timing are necessary.

If necessary, ADVANTEC will attend OCTA’s Traffic Forum representing the City of Placentia. • The ideal firm will include personnel with extensive experience in traffic signal operations management and familiarity with the City’s (traffic signal management system and controllers). Local knowledge and experience are also desired.

ADVANTEC’s staff has extensive experience working in traffic signal operations for cities of various sizes and are very familiar with Econolite’s signal management system and controllers.

Traffic Engineering
ADVANTEC will provide traffic engineering services and will assist in the review, analysis, and preparation of traffic engineering reports and design plans, related to:
• Conduct or review traffic engineering studies, traffic operations analysis, and transportation planning studies or project specific traffic analyses;
• Develop alternative analysis and preliminary engineering design; • Conduct traffic calming analysis and design;
361

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 23 ends

• Provide traffic control device studies and design (signs, signals, pavement markings, electronic speed feedback signs and pedestrian beacons);
• Perform technical studies to support Active Transportation and Safe Routes to School programs; • Design traffic signal systems including plans, specification, engineer’s cost estimate and contract bid documents for new permanent signal installation modifications to existing signals, signal interconnect installation and Traffic Management Center (TMC) enhancement; • Provide technical support for Transportation System Management and Operations (TSMO); • Prepare or review stage construction and worksite traffic control plans; Our general work plan for these tasks consists of:
 ADVANTEC will collect all necessary documents from the City and other agencies, including traffic data, accident data, reports, and improvement plans in order to review, analyze, and provide recommendations and to ensure the safe and efficient operation of the transportation system in the City of Placentia.

ADVANTEC will generate a variety of traffic engineering studies, to analyze and document projects at various stages of development. ADVANTEC will utilize Caltrans, City of Placentia design standards, California Manual on Uniform Traffic Control Devices (CA MUTCD), Institute of Transportation Engineers (ITE), Urban Land Institute, California Vehicle Code and industry policies and standards for the evaluation and analysis of intersection and roadway systems.
 ADVANTEC will perform an in-depth field analysis to verify record information including existing roadway lane geometrics, intersection control, signal phasing, and signing/striping. ADVANTEC will maintain a photo log of the project. Key technical issues will be identified after the field review has been conducted.  ADVANTEC will provide traffic engineering studies, which summarizes: the existing and proposed conditions, references requirements and assumptions, intersection, roadway, and circulation analysis, and recommendations. Supporting technical data and graphical illustrations will be included in the reports.

ADVANTEC has the experience to provide the City with different types of traffic engineering analysis and reports; including accident analysis, delay analysis, lane storage capacity, roadway and intersection level-of- service, vehicle and pedestrian circulation analysis, traffic impact analysis, before and after travel demand, engineering and speed survey, sight distance analysis, and queuing analysis.  ADVANTEC will prepare geometric and channelization plans as requested by the city. ADVANTEC will show existing and proposed conditions on the plans. Constraint areas will be provided to the city along with design recommendations. ADVANTEC will prepare final PS&E for each assigned project. ADVANTEC will provide PS&E submittals at 30% (conceptual), 95%, and 100% completion.  ADVANTEC will provide third party review of traffic engineering studies, design plans, technical specifications, and engineer’s estimates prepared by others to assure consistency with the City’s General Plan elements, compliance with local and regional mandates and compatibility with other proposed developments and improvements. If required, ADVANTEC will prepare grant applications. ADVANTEC will work directly with the City staff to provide all the information required to be included with each specific application. ADVANTEC will work with the City to obtain vehicle and pedestrian traffic data, accident data and additional information that will be required in order to prepare each specific grant application.

Detailed Steps to Provide Traffic Engineering Services
The table below are examples of our experience, approach and/or preparation to deliver the requested services outlined in the RFP. Please note that not all of the services from the RFP are listed below, but ADVANTEC has the expertise and experience to deliver all services.
362

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 24 ends

Requested
Scope of
Services
ADVANTEC's Experience and Approach to Perform the Work
Traffic Signal
Design and
Traffic Signal
Modification
Design
ADVANTEC will prepare plans, specifications, and estimates (PS&E) related to the project improvements. The project plans will include a titlesheet and traffic signal design or modification plan.

The traffic signal modification plan will include all base mapping, as-built information and utilities, and all existing and proposed traffic signal poles and equipment, communication infrastructure, battery backup systems, signal heads, pedestrian heads, video detection cameras, detection, pole schedules, conductor schedules, construction notes, and any details necessary to facilitate the installation and construction of the project improvements.

ADVANTEC will prepare the project Technical Specifications and Bid Documents for the associated improvements based on Caltrans Standard Specifications and Standard Plans, latest City-approved Standard Specifications for Public Works Construction and the latest City Design Criteria and Manuals, Standard Special Provisions and Standard Drawings, and the California Manual on Uniform Traffic Control Devices (CAMUTCD). The technical specifications will include an itemized bid schedule, bid item descriptions, and payment methods.

ADVANTEC will prepare construction quantity take-offs and construction cost estimates for the proposed traffic signal modification and other project improvements (if necessary). The unit costs will be based on current cost data. Preliminary and final quantities and construction cost estimates will be provided to the City.

Signing And
Striping
Design
ADVANTEC will prepare signing and striping plans based on the project limits defined by the City.

ADVANTEC will layout the roadway base mapping based on our research of record drawings and field review.

ADVANTEC will extend the limits of the roadway base plans to ensure that the travel lanes are aligned at intersection crossings, and to provide proper transitions along each approach (if necessary). The plans will show existing and proposed signing and striping. The plans will also identify existing features to remain, existing features to be removed, and new features to be installed.

Based on input from the City at the pre-design/kick-off meeting, ADVANTEC will prepare preliminary concept plans that will incorporate any areas of special interest or concern discussed during this meeting. Based on direction received from the City during the concept review, draft plans will be prepared and submitted to the City. Following receipt of comments on the draft plan review, final plans will be provided.

Signing and Striping Plans will be prepared at 1” = 40’ scale, dual tier format and in accordance with standards set forth by the City , latest California Manual on Uniform Traffic Control Devices, latest Caltrans standard plans and specifications, and current American with Disabilities Act requirements.

363

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 25 ends

Requested
Scope of
Services
ADVANTEC's Experience and Approach to Perform the Work
Traffic
Control And
Stage
Construction
Design
ADVANTEC will prepare plans, specifications, and estimates (PS&E) related to the project improvements and traffic control and stage construction design.

ADVANTEC layout roadway base mapping based on our research of record drawings and field review. ADVANTEC will extend the limits of the roadway base plans to ensure that the travel lanes are aligned at intersection crossings, and to provide proper transitions along each approach (if necessary). The plans will show existing and proposed signing and striping related to traffic control and stage construction design. The plans will also identify existing features to remain, existing features to be removed, and new features to be installed.

Pedestrian and bicycle detours will be provided as necessary.

Traffic Control And Stage Construction Design will be prepared at 1” = 40’ scale, dual tier format and in accordance with standards set forth by the City , latest California Manual on Uniform Traffic Control Devices, latest Caltrans standard plans and specifications, and current American with Disabilities Act requirements.

Traffic Signal
Warrants
ADVANTEC will prepare Traffic Signal Warrant Studies at various intersections as requested by City staff. The Traffic Signal Warrant analysis will be prepared to determine if a traffic signal is warranted.

The analysis will be prepared using the latest California Manual on Uniform Traffic Control Devices (CAMUTCD). Based on our evaluation, the recommendations will be provided.

The 24-hour three-day ADT volumes, peak hour turning movement volumes including pedestrians and bicyclists, and intersection collision history will be reviewed and documented in the study. It is assumed that the City will provide collision history data for the past three to five years.

ADVANTEC will prepare a project study report describing existing conditions, data collection including pedestrians and bicyclists, collision history, traffic signal warrant analysis, and recommendations. Supporting technical data, tables and graphical illustrations will be included in the report.

Stop
Warrants
ADVANTEC will prepare an All-Way Stop Warrant Studies at various intersections as requested by City staff. The All-Way Stop Warrant analysis will be prepared to determine if an All-Way Stop is warranted.

The analysis will be prepared using the latest California Manual on Uniform Traffic Control Devices (CAMUTCD). Based on our evaluation, the recommendations will be provided.

The 24-hour three-day ADT volumes, peak hour turning movement volumes including pedestrians and bicyclists, and intersection collision history will be reviewed and documented in the study. It is assumed that the City will provide collision history data for the past three to five years.

ADVANTEC will prepare a project study report describing existing conditions, data collection including pedestrians and bicyclists, collision history, all-way stop warrant analysis, and recommendations. Supporting technical data, tables and graphical illustrations will be included in the report.

Left Turn
Phasing
Warrants

ADVANTEC will prepare a Left-Turn Phasing and Level-Of-Service (LOS) analysis for the project intersections. ADVANTEC will collect AM, Midday, and PM peak hour traffic counts in order to conduct the analysis. The counts will include vehicles, pedestrians and bicycles.

ADVANTEC will prepare a left-turn phasing analysis determine if protected left turn phasing or other (permissive, protective-permissive) is necessary at each signalized intersection. There are five different guidelines that can used to determine the proper type of left turn phasing, this 364

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 26 ends

Requested
Scope of
Services
ADVANTEC's Experience and Approach to Perform the Work
includes: 1) Federal Highway Administration’s (FHWA) “Signalized Intersections – Informational Guide”; 2) NCHRP Signal Timing Manual, Second Edition; 3) the California Manual on Uniform Traffic Control Devices (CAMUTCD); 4) the Highway Capacity Manual (HCM), or 5) Institute of Transportation Engineers (ITE). Each guideline uses slightly different metrics to consider left turn control, yet are similar in that they all consider the volume-to-capacity (v/c) ratio for the permissive left turn as a function of the opposing traffic flow.

ADVANTEC will prepare a level-of-service (LOS) analysis for existing and proposed conditions. The proposed conditions will be based on results of the left-turn phasing analysis. ADVANTEC will develop a traffic model using Synchro software, calibrate the model with the existing traffic signal timing parameters (from timing sheets provided by the City), and input the traffic counts in order to provide the LOS and operations analysis. Two scenarios will be analyzed for each project intersection: 1) existing conditions and 2) with protected left turn phasing during the AM, Mid-day, PM peak hours. A comparison analysis between these two scenarios will be provided that evaluates the difference between the LOS.

Based on the results of the LOS analysis, ADVANTEC will provide recommendations for the left turn phasing, and If additional deficiencies are found, ADVANTEC will provide recommendations to improve the signal operations.

A technical memorandum will be prepared introduction, purpose, study area, existing conditions, LOS methodology, LOS analysis, protected left turn phasing analysis, and recommended improvements (e.g. left turn phasing, and improved signal operations). The final format of the project report will be based on the City’s review and approval. We anticipate up to three submittals of the project report: one submittal of the draft technical memorandum, the second submittal to address comments of the draft technical memorandum, and the third submittal to address any comments of the final technical memorandum.

Engineering
& Traffic
Speed
Surveys

This E&TS updates will justify the posted speed limits and enable the local police department and law enforcement agencies to perform radar enforcement that is defendable by the court of law.

ADVANTEC understands that state and local agencies should conduct E&TS studies at least once every 5, 7 or 10 years, in compliance with California Vehicle Code (CVC) Section 40802 to reevaluate non-statutory speed limits on segments of their roadways that have undergone significant changes since the last review, such as the addition or elimination of parking or driveways, changes in the number of travel lanes, changes in the configuration of bicycle lanes, changes in traffic control signal coordination, or significant changes in traffic volumes.

ADVANTEC will work with the City to determine the number of segments, speed survey, and ADT locations.

This survey will also incorporate the E&TS related support (requirements), standards, and guidance in California Manual and Uniform Traffic Control Devices (CAMUTCD), Section 2B.13., that includes, but not limited to:

Engineering and Traffic Survey (E&TS)
Support:
• CVC Section 627 defines the term “Engineering and traffic survey” and lists its requirements. • Take into account of AB 43 legislation and the latest CAMUTCD E&TS requirements.

Standard:
• An engineering and traffic survey (E&TS) shall include, among other requirements deemed necessary by Caltrans, consideration of all of the following:
365

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 27 ends

Requested
Scope of
Services
ADVANTEC's Experience and Approach to Perform the Work
A. Prevailing speeds as determined by traffic engineering measurements.

B. Collision records.

C. Highway, traffic, and roadside conditions not readily apparent to the driver.

Guidance:
• The E&TS should contain sufficient information to document that the required three items of CVC Section 627 are provided and that other conditions not readily apparent to a driver are properly identified.
• Prevailing speeds are determined by a speed zone survey.

The product of the study will be a legal document that will be acted on by the City Council to formally adopt and/or change specific speed limits at the surveyed locations. The report will be the document used by the Police Department, law enforcement agencies and the courts in the day-to- day legal defense activities of the established speed limit.

Our goal is to work hand in hand with the City to provide continuity of speed and motorist safety.

This updated and valid Engineering and Traffic Survey is critical to maintaining the mobility, safety and quality of life for City residents and visitors.

Parking

ADVANTEC will prepare parking and circulation analysis evaluating as requested by the City.

The analysis will evaluate vehicular traffic flow conditions traveling and entering/exiting the parking facility during typical weekday and weekend conditions.

ADVANTEC will work with CITY-staff to identify parking scenarios and circulation alternative consisting of modifications to the roadway circulation and on-site parking system in the study area.

Existing conditions opportunities and constraints will be identified. Potential modification to the roadway circulation system within the study area could include travel lane width reduction, adding right-turn and left-turn lanes, way-finding signage, etc.

Based on our review of City’s documents, parking data collected, and our field review of the project area, ADVANTEC will conduct a parking analysis to evaluate an on-site parking facility.

ADVANTEC will identify areas where parking is not recommended based on roadway width, driveways, and intersection/driveway sight distance constrains, and physical constraints.

ADVANTEC will review the proposed project circulation and will identify any issues that may impact the circulation and proposed entry/exit points. Based on our experience, every parking facility should include at a minimum two (2) access points for emergency purposes.

ADVANTEC will review existing signage, striping and vehicle circulation along the project area.

ADVANTEC will identify any issues that may impact the proposed parking facility including on-site and off-site circulation. ADVANTEC will provide potential parking recommendations along the project area.

Intersection
And
Roadway
Line Of Sight
Analysis

ADVANTEC will prepare line of sight analysis evaluating and documenting existing roadway, signage, and striping conditions, and evaluating the line of sight for vehicles traveling along each approach. The line-of-sight analysis will be based on existing posted speed, and the 85th percentile speed (if available).

The Line-of-Sight Analysis will be prepared using the latest version of the Caltrans Highway Design Manual (HDM) Sixth Edition. Based on the analysis, recommendations will be provided to improve the line of sight for vehicles approaching and exiting the intersection or driveway.

ADVANTEC will prepare a conceptual plan that shows recommended improvements at the study intersection or driveway.
366

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 28 ends

SCHEDULE
Traffic Signal Operation Management Tasks
ADVANTEC expects all traffic monitoring tasks defined in the scope of work to be performed on a daily, weekly or monthly basis. There are no “critical path” tasks. A detailed list of our daily, weekly and monthly activities are presented in the next three tables.

SIGNAL OPERATIONS DAILY TASKS Description
• Remotely connect to City’s CENTRACS  Use TeamViewer account provided by City • Check for System Error Messages  Verify System Message Window • Check System Clock  Verify server computer clock
• Check Communications to each controller  Verify Intersection Graphics is displaying signal operations  Verify Upload and Download functions can complete without errors  Verify that signal controller is running coordination plans • Report communications problems to
Technician
 Schedule City maintenance contractor to troubleshoot
communication problem within one week
• Troubleshoot any issues brought up by City
staff
 Verify signal operations through CENTRACS.
 Determine degree of urgency of response.
 Contact maintenance contractor within the same day if urgent. • Update monitoring log  Use City provide form

SIGNAL OPERATIONS WEEKLY TASKS Description
• Follow-up on previous week’s issues  Contact City staff, City’s contractor, and/or ADVANTEC’s Systems Engineer
 Inquire on status of issue and resolution
• Prepare weekly monitoring report  Use City provided form

SIGNAL OPERATIONS MONTHLY TASKS Description
• Update intersection graphics, as needed  Verify changes to intersection configuration • Update Signal Coordination parameters, as
needed
 As requested by City staff, verify signal coordination along corridor  Verify controller operations
 Drive corridor
 Implement new coordination parameters
• Update Signal detection parameters, as needed  As requested by City staff, verify signal detection at intersection  Verify controller operations
 Implement new detection parameters
 Produce a new Timing Sheet, place copy in cabinet and provide a copy to City.
• Check Coordination timing periodically  Drive all coordinated corridors, as needed, Tuesday to Thursday, during the peak time periods (), or as requested by the City  Ensure system performance. Observe progression speeds, queue clearance and coordinated green bands.
• Prepare monthly monitoring report  Use City provided form 367

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 29 ends

Traffic Engineering Tasks
The traffic engineering tasks outlined in the RFP will have varying schedules depending on complexity and size of the effort.

Typical tasks for conducting a traffic engineering study, including existing conditions, data collection review, crash history analysis, alternative analysis, preliminary/conceptual design and recommendations:
• Data collection (2 weeks)
• Field Review (1 week)
• Preliminary Analysis/Design (2 to 3 weeks)
• City Review of preliminary analysis/design (2 weeks)
• 90% Design/Draft Report (1 to 2 weeks)
• City review of 90% plans/draft report (2 weeks)
• 100% Design/Final Report (1 to 2 weeks)
• City review and approval or plans/report (2 weeks)
Typical Tasks for conducting design of traffic signals, including signing and striping, signal communications, and traffic management center upgrades:
• Data collection (2 weeks)
• Field Review (1 week)
• Preliminary Analysis/Design (4 to 8 weeks)
• City Review of preliminary analysis/design (2 weeks)
• 90% Design/Draft Report (2 to 4 weeks)
• City review of 90% plans/draft report (2 weeks)
• 100% Design/Final Report (1 to 2 weeks)
• City review and approval or plans/report (2 weeks)

REQUIRED PROPOSAL STATEMENTS
This section includes the required statements identified in the Request for Proposal A. ADVANTEC will perform the services and adhere to the requirements described in the RFP.

B. ADVANTEC acknowledges that ,subsequent to award of this RFP, all or part of any submittal may be released to any person or firm who may request it, as prescribed by the State of California Public Records Act.

ADVANTEC does not claim any portion of its submittal to be considered proprietary.

C. ADVANTEC will not substitute members of our designated team without approval by the City of Placentia staff.

D. ADVANTEC and its staff do not have any Conflict of Interests.

E. ADVANTEC has not colluded with other proposing firms.

F. ADVANTEC has the ability and agrees to fulfill the indemnification and insurance requirements contained in the sample contract.
368

Proposal for On-Call Traffic Engineering Services
City of Placentia

Page 30 ends

EXCEPTIONS
ADVANTEC does not propose any exceptions, alterations or amendments to the Scope of Services or other requirements of the RFP, including the Sample Contract.

RESOURCE ALLOCATION AND COST PROPOSAL
The proposed billing rates for all personnel expected to deliver services under this contract are provided in a separate submittal. ADVANTEC will develop detailed scope and cost proposals upon request from the city. Below is a typical annual staff allocation for Traffic Signal Operations Management Services.

Task Description Project
Manager
Systems
Engineer
Project
Eng
Assoc.

Engineer
Assist.

Engineer
Total
Hours
Traffic Signal Operations Management (*Assume 250-hours annually) • Manage day-to-day traffic signal operations, systems and performance.
• Monitor and review data daily to verify that all traffic signals are working properly.
• Monitor systems logs to identify potential operational issues 6 14 24 24 68
• Connect to and provide traffic signal input into system controllers manually and/or from the Consultant’s office, including designing and installing special custom traffic signal operational circuity and maintaining signal interconnect operations.
12 12 24
• Report all traffic signal problems and malfunctions to the City within 24 hours
• Coordinate maintenance activities with City’s maintenance contractor and Transportation Manager.
6 14 8 28
• Monitor system coordination along key corridors and refine in response to changing traffic patterns or other requirements to ensure the most efficient signal progression.
• Review the results of corridor traffic signal coordination studies and provide input regarding recommended
equipment, traffic signal coordination parameters
• Coordinate with other local agencies on major coordination projects.
• Analyze historical data to identify volumes and patterns to assist in determining necessary signal timing adjustments. 6 12 80 98
• Coordinate with the Transportation Manager to investigate and respond to citizen and stakeholder requests or concerns related to traffic signal operations.
6 3 3 12
• Investigate and make recommendations on traffic signal improvements, such as any new coordinated signal control systems, more efficient signal phasing, equipment upgrades and significant timing adjustments.
2 6 6 14
• Meet as necessary with the Transportation Manager to
discuss issues potentially affecting City traffic signal operations.
4 2 6
Total Hours 30 49 67 0 104 250
Total Annual Hours = 250

369

Proposal for On-Call Traffic Engineering Services
City of Placentia

APPENDIX

APPENDIX – RESUMES

370

Jose Guedes, TE
Project Manager
Jose Guedes is a project manager, senior engineer and the team leader in the Traffic Signal Operations and Synchronization practice for ADVANTEC. Jose has over 33 years of experience in traffic forecast/modeling, traffic operations and engineering, including 24 years in traffic signal sychronization project management on over 2500 intersections.

Recent Project Experience
On-Call Traffic Engineering
City of Glendale, On -Call Traffic Engineering Services – Project Manager. ADVANTEC was selected by the City of Glendale Public Works Department to provide traffic engineering support services, such as traffic and transportation planning, traffic engineering design, traffic operations analysis, and traffic study reports, as requested. We have completed several task orders, including conversion of timing sheets to new ATC controllers, review of Bus Priority parameters, and review and adjustment of timing parameters for implementation of Lead Pedestrian Interval at the downtown area.

Performance Duration: 2022-2026
Consulting Fee: Up to $500,000
Construction Cost: N/A

Riverside County Transportation Department , On -Call Traffic Engineering Services (Riverside, CA) – Task Leader on Signal Synchronization and Operations. ADVANTEC was selected by the Riverside County Transportation Department (RCTD) to provide on -call traffic engineering services to augment its in-house resources with our strong traffic engineering expertise and capabilities to support the department’s project delivery as part of their 5-year Transportation Improvement Program (TIP). Besides augmenting staff on-site at RCTD offices for their municipal engineering needs, ADVANTEC’s home office engineering team also provides the necessary design support for their project delivery process. We have completed several task orders, including:
• Traffic Signal Timing Update – Updated and prepared new signal timing sheets for 148 county signal locations based on CA- MUTCD, including calculation of yellow times, pedestrian crossing distances and clearance timing, bicycle crossing distance and minimum green, and values for Red-Revert and All-Red Start times.
• Traffic Signal Synchronization - Developed synchronization timing plans for multiple county roadway segments, such as Murrieta Hot Springs Road, Van Buren Blvd, Cajalco Road, Monterey/Varner/I -10 interchange, Stetson Avenue, Cook Street/Varner/I -10 interchange including Caltrans freeway ramp

Registration:

Traffic Engineering, CA TR1861

Years of Experience: 33
Years with Firm: 13

Education:

M.S, Transportation
Engineering, University of
California, Irvine, 1990

B. S., Civil Engineering,
Universidade de Sao Paulo,
Brazil, 1986

Professional Affiliations:

Institute of Transportation
Engineers (ITE)

371

signals. Tasks performed included: collection of ADT counts and turning movement counts, development of optimized timing plans for 3 peak periods (AM, Midday and PM), preparation of timing sheets, assisting county staff in implementation of new timing, and fine -tuning of implemented synchronization plans. ADVANTEC also provided training on signal synchronization process for county staff. • Signal Communication Master Plan: Prepared a technologies assessment report to provide countywide access to remote traffic signal locations, and design of countywide wireless communication network that enable county staff to monitor traffic signal operations and maintenance, and in -cabinet equipment monitoring (Battery Backup, conflict monitor, etc.).
• Grant Application support – Prepared and submitted multiple grant applications for RCTD to secure transportation improvement funds for the Department’s TIP. • Project Management Staff Augmentation – Provided as -needed engineering services to Project Development section, including project budget, manage consultant’s design, coordinate environmental documents, oversee preparation of PS&E documents, monitor and manage resource allocation. • Systemic Safety Analysis Report Update – Prepared updated report with current collision data, identified high-collision intersections and roadway segments, and developed countermeasures for safety projects.
• Traffic Signal Controller/Timing Sheets Update – Converted and prepared signal timing sheets for new 2070 ATC controllers at 25 traffic signals countywide.
• Traffic Signal Improvement Design – Prepared traffic signal, street improvement, and signing and striping plans, including final plans, specifications, and estimates, and provided support for bidding and construction. Recent locations include Highway 74 & Mountain Avenue, Pourroy Road & Pourroy Road, and Grand Avenue & Sangston Drive.
• Transparity Implementation Assistance – Assisted in implementation of Transparity ATMS software for western county. Conducted field reviews and assisted County staff in the configuration of traffic signal and communications equipment.

Performance Duration: 2017-Ongoing
Consulting Fee: $250,000/year
Construction Cost: N/A

Traffic System Monitoring and Operations
City of Chino Hills, Citywide Traffic Signal Operations - Project Manager. Since 2010, ADVANTEC has been managing traffic signal system monitoring and operations for the City of Chino Hills. Mr. Guedes oversaw specific tasks including:
• Central System Monitoring: Ensuring existing signal timing, detector functionality, and coordination parameters are checked weekly or upon the City's request, whether in the field (for off -line signals) or at the office (for on-line signals), within 24 hours of the request. • Aries System Updating : Keeping intersection graphical displays, detector assignments, and timing plans up-to-date, while providing technical support.
• Signal Timing: Adjusting timing parameters like offsets, splits, and timing plans to enhance traffic flow, with maintenance of signal timing charts in each cabinet and submission of copies to the City’s Engineering Department.
• Data Management and System Communication: Managing the upload and download of traffic data from signal controllers and maintaining communication between master controllers and the central system.
• Troubleshooting: Addressing specific signal issues as reported by the City, both in the office and in the field, making recommendations for remediation and implementing approved changes. 372

Additionally, ADVANTEC provided as -needed services related to traffic signal design and plan check, as well as traffic signal construction management and inspection services.

Performance Duration: 2010-Ongoing
Consulting Fee: $23,000/year
Construction Cost: N/A

Traffic Engineering Studies
City of Glendale, Citywide Traffic and Mobility Study – Project Manager. The primary goal of the CTMS is to improve traffic and mobility within the City by providing a detailed analysis of the City’s transportation system and a quantitative view of current transportation issues, impacts, concerns, trends, system capacity surplus and shortfalls.

The CTMS will assess the existing traffic and congestion throughout the City, expand the City’s current Synchro Level of Service (LOS) model to evaluate the existing traffic flow, forecast the near -term-future (10 years) traffic congestions using City’s Traffic model, provide recommended countermeasure alternatives to improve traffic flow and circulation, while maintaining consideration of other active modes of travel and discouraging commuter traffic intrusion into residential neighborhoods.

The CTMS will also evaluate lane reconfiguration alternatives identified in the latest versions of the Citywide Pedestrian Plan (CPP) and the Glendale Bicycle Transportation Plan (BTP) and respective impacts on traffic congestion, circulation, and potential traffic intrusion into residential neighborhoods. The study will develop innovative ideas to improve possible congestion resulting from implementation of the BTP and CPP.

The CTMS also includes a) preparation of a Citywide Emergency Vehicle Response Routes to assist fire department during major emergencies; b) public and stakeholder outreach to gather input from public through surveys and website; and, c) a Speed Limit Study to identify street segments that may qualify as “Business Activity Districts” and be considered for lower speed limits. Results from the CTMS data collection and analysis will be made available through user -friendly GIS maps.

Performance Duration: 2024- Ongoing
Consulting Fee: $495,000
Construction Cost: N/A

City of Glendale, Regional Arterial Traffic Performance Measurement System - Project Manager. Mr.

Guedes led a citywide operational analysis and retiming project in Glendale, leveraging Synchro software to create a level of service model for 157 signalized intersections. His tasks included collecting turning movement counts for AM, Midday, and PM periods; conducting field inventories of lane configurations and signal phasing; updating timing parameters per CA -MUTCD and city guidelines; preparing Level of Service models; developing mitigation measures and optimized timing plans with recommended cycle lengths, splits, and offsets; implementing and fine-tuning synchronization timing plans at 50 locations; and compiling both Draft and Final Reports to document the project's processes and results.

Performance Duration: 2021-2023
Consulting Fee: $135,000
Construction Cost: N/A

Town of Yucca Valley, Local Road Safety Plan - Project Manager. Mr. Guedes oversaw the development of a Local Road Safety Plan (LRSP) for Yucca Valley, working in collaboration with stakeholders such as the local community, businesses, and various public service departments. The plan involved reviewing existing safety policies and conducting a thorough analysis of collision data to understand traffic patterns and identify key safety issues. Priority areas for intervention were pinpointed to set goals and devise strategies, incorporating the 4 E's of highway safety: Engineering, Enforcement, Education, and Emergency response, aimed at enhancing traffic safety and reducing collisions on town roads.

Performance Duration: 2021-2022
Consulting Fee: $70,000
373

Construction Cost: N/A

City of Irvine, As -Needed Citywide Travel Time Studies – Project Manager. Mr. Guedes led the effort for the City of Irvine, conducting citywide travel time surveys to gather data for the Annual Traffic Management Study, evaluating the effectiveness of traffic signal coordination timing. Surveys covered all major corridors, collecting data during three peak periods —AM, Midday, and PM—before summarizing and comparing it to the results of the previous year. Each year, the study encompassed between 16 and 20 corridor segments.

Performance Duration: 2021-2022
Consulting Fee: $43,000
Construction Cost: N/A

Traffic Signal Synchronization and ITS
City of Upland , Citywide Traffic Signal System Assessment & Master Plan – Project Manager. The goal of this project is to provide a blueprint for the City to upgrade the current traffic signal system to modern standards and update signal timing and coordination plans to provide the safe and efficient movement to all modes of transportation, while improving the quality of life for the residents, businesses, and visitors alike in the city.

This project consists of conducting a detailed inventory of the City’s existing traffic signal equipment and identify deficiencies, establish new traffic signal equipment standards for the city, prepare a capital improvement program to upgrade traffic signal equipment to the new standards, and identify strategies in prioritizing and funding the upgrades. The project will also update traffic signal timing to meet the latest MUTCD requirements, review and revise existing signal coordination plans, and recommend procedures for record keeping of traffic signal timing changes. In addition, the project will establish a strategy for preparation of an Intelligent Transportation Systems (ITS) Master Plan that will serve as a roadmap to design, implement, operate, and maintain the next generation of smart mobility technologies .

Performance Duration: 2024 - Ongoing
Consulting Fee: $169,000
Construction Cost: N/A

OCTA, Los Alisos Boulevard Route Traffic Signal Synchronization and ITS Project - Project Manager. Funded by OCTA’s Project P program, this project involved the development of signal synchronization and Intelligent Transportation Systems (ITS) enhancements along Aliso Viejo Parkway, Laguna Hills Drive, Paseo De Valencia, Los Alisos Boulevard, and Melinda Road (40 signals). Mr. Guedes spearheaded this Design -Build initiative, which entailed updating timing parameters in compliance with the latest CA -MUTCD standards, implementing signal synchronization, and designing and installing Fiber -Optic cables, Radar vehicle detection systems, GPS-based preemption technology, and CCTV cameras. Additionally, the project encompassed the replacement of cabinets and controllers across Aliso Viejo, Laguna Hills, Lake Forest, Mission Viejo, and Rancho Santa Margarita. A two-year operation and monitoring phase followed, incorporating monthly travel time surveys and synchronization timing monitoring.

Performance Duration: 2019-2023
Consulting Fee: $500,000
Construction Cost: $1.6 million

374

Carlos A. Ortiz, PE, TE, PTOE
Project Director
Mr. Ortiz is a globally recognized expert bringing smart mobility and technology solutions to Smart Cities/Region, Connected/Automated Vehicles (CAV), Intelligent Transportation System (ITS), Traffic Engineering, and Transportation Planning and Engineering Projects and Programs for numerous agencies, private developments and institutions. He has worked on many multi-modal and complex projects and has the ability to resolve problems quickly and efficiently by drawing on his many years of experience in our transportation industry.

RELEVANT EXPERIENCE
Coachella Valley Association of Governments (CVAG) Smart Region Program – Regional Broadband Communications (Coachella Valley, Riverside County, CA) - Project Manager. As part of the Region’s Smart Region Program, ADVANTEC is providing planning and design professional services for the implementation of Broadband Communications along 24 Corridors in the Coachella Valley. The first project is funded by the State of California Middle Mile Grant to design Broadband Communications along Highway 111 from the cities of Palm Springs to Coachella. ADVANTEC is supporting CVAG to extend the region’s broadband program to the Salton Sea.

Coachella Valley Association of Governments (CVAG) Smart Region Program – Phases I, II and III (Coachella Valley, Riverside County, CA)- Project Manager. ADVANTEC developed the Regionwide ITS Master Plan that will be used as a planning tool to prepare local agencies and CVAG for future emerging transportation technologies including nine (9) Traffic Operation Centers (TOC), One (1) Regional Traffic Management Center(TMC), Transit Signal Priority (TSP), Cloud Services, Software-as-a-Service (SaaS), Cyber Security, connected and automated vehicles (CAV), Big Data, integrated corridor management (ICM), Mobility-as-a-Service (MaaS), Mobility on Demand (MOD), regionwide Broadband communications, and Smart Cities initiatives. .

ADVANTEC prepared final plans, specifications, and engineer’s estimates (PS&E) for Phase I (completed) and includes three major corridors and 138 signalized intersections. ITS elements consist of open architecture and state-of-the-art 2070 and NEMA ATC units with Application Programing Interface (API), Openly sharing Management Information Base (MIBs) at no cost to CVAG , C-V2X Roadside Units (RSUs) with Bluetooth, Wi Fi, GPS and Transit Signal Priority (TSP), Smart Closed-Circuit Television (CCCTV) systems with analytics, Arterial Performance Measurement Systems (APEMS), Changeable Message Signs (CMS), Video/Radar Detection Systems, secured Ethernet fiber optic communications and the Regional TMC and nine (9) local TOCs. Phase II (under construction) includes upgrades of 260 traffic signal systems, installation/upgrade of

Registration:

Civil Engineer, CA, C057535
Traffic Engineer, CA, 2025
Civil Engineer, AZ, 34333
Professional Traffic
Operations Engineer, US, 426

Years of Experience: 3 5
Years with Firm: 9

Education:

B.S., 1989, Civil Engineering,
California State Polytechnic
University, Pomona

Professional Affiliations:

School of Civil Engineering
Industry Advisory Council (IAC),
California State Polytechnic
University, Pomona
ITE International, Past Board
Member
- ITE International Past
Board of Direction
- TSMO Council
- Transportation
Consultant Council
- Industry Council
- Advocacy Committee
- Nomination Committee
ITS California, Board Member
- ITS CA Board of Direction
- ITS CA Partnership Chair
- ITS CA Southern Section
Past Chair
- ITS CA Annual
Conference Committee

375

approximately 240-miles of signal communications, and installation of various ITS field elements, including closed-circuit television systems, dynamic/changeable message signs, arterial management systems, detection systems, and C -V2X RSUs . Phase II also includes the planning, design and implementation of Broadband Communications along 21 corridors in the Coachella Valley. Phase III consists of 3 corridors and 27 signalized intersections. Overall, ADVANTEC has designed over 400 miles of fiber optic communications and 12,000 ITS elements (including over 400 RSUs) with individual Barcode and IP address . ADVANTEC formed a Transportation Systems Management and Operations (TSM&O) Working Group formed of CVAG staff, and county and cities staff to provide education materials, facilitate project delivery, approval of regionwide technology standards, and development of the cooperative agreement .. As part of the CV Sync Program, ADVANTEC has developed a Regionwide Traffic Signal Timing Parameters Guidelines, traffic signal timing/synchronization plans, and has synchronized the Phase I Corridors (140 traffic signals), and we are planning to synchronize Phase II Corridors (260 traffic signals) in 2025. In addition, ADVANTEC is supporting CVAG and the cities providing Special Event Management. Our staff has participated managing vehicle, pedestrian and bicyclist traffic, parking, and circulation during the City of La Quinta Ironman, City of Indian Wells BNP Open, and planning to support the Coachella Music Festivals and Stagecoach starting in 2025.

On-Call Transportation Services, Riverside County Transportation Department (County Of Riverside, CA ) – Project Director. ADVANTEC was selected by the Riverside County Transportation Department (RCTD) to provide on-call traffic engineering services to augment its in-house resources with our strong traffic engineering expertise and capabilities to support the department’s project delivery as part of their 5 -year Transportation Improvement Program (TIP). Besides augmenting staff on -site at RCTD offices for their municipal engineering needs, ADVANTEC’s home office engineering team also provides the necessary design support for their project delivery process. We have completed several task orders, including: Traffic Signal Timing Update; Traffic Signal Synchronization; Traffic Signal Timing Update; Traffic Signal Synchronization, Traffic Signal Communication Master Plan, Grant Application Support, Systemic Safety Analysis Report Update, Traffic Signals and Intersection Improvements PS&E , Traffic Signal Controller/Timing Sheets Update, Transparity Advanced Traffic Management System (ATMS) Implementation.

Traffic Signals and ADA Ramps Improvements (HSIP Cycle 9) Project (Cathedral City, CA) – Project Director.

ADVANTEC is providing environmental, traffic engineering and public works services; including preparation of environmental documents; preparation of plans, specifications and estimates (PS&E); and provide construction support for the City’s HSIP Cycle 9 project, City Project No. CO8752, Federal Aid Project No.

HSIPL-5430 (034). This project is fully funded through the federal aid Highway Safety Improvement Program (HSIP), and requires in-depth knowledge and compliance with Caltrans Local Assistance Procedures Manual (LAPM), the Caltrans Construction Manual, and other Federal Highway Administration (FHWA) requirements.

The project requires preparation of the necessary environmental documentation per the National Environment Policy Act (NEPA) and California Environmental Quality Act (CEQA). The purpose of this project is to improve safety and visibility of the traffic signals by installing American with Disabilities Act (ADA) compliant pedestrian ramps, upgrading traffic signal equipment and signing/striping to the latest standards, protective/permissive or protected left turn phasing, installation of new countdown pedestrian heads, pedestrian push buttons, and installation of advanced dilemma zone detection for high speed approaches at ten (10) signalized intersections.

Traffic Signals Improvements (HSIP Cycle 8) Project (Palm Springs, CA) – Project Director. ADVANTEC is providing traffic engineering, civil engineering, and environmental services (to secure environmental documentation approvals); Caltrans encroachment permits; and preparation of plans, specifications and estimates (PS&E) for 14 signalized locations including construction support for the City’s Traffic Signal Improvements (HSIP Cycle 8) project. The purpose of this project is to improve safety and visibilit y of the traffic signals by upgrading traffic signal equipment and signing/striping to the latest standards, protected left turn phasing, ADA compliant access ramps, installing advanced dilemma zone detection for high speed approaches at 14 intersections. This includes establishing c ommunications and integrating the data and video 376

streams to the City’s Traffic Management Center (TMC) located at City Hall. In addition, this project included a left-turn phasing and level of service (LOS) analysis report to determine the proposed left -turn phasing, as well as signal timing upgrades that are associated with the implementation of the advanced dilemma zone detection system.

Cook Street And Market Place Drive Intersection Improvements (Palm Desert, CA) – Project Director.

ADVANTEC was selected by the City of Palm Desert to provide plans, specifications, and estimates for a New Traffic Signal at the intersection of Cook Street and Market Place Drive. The installation of this new signalized intersection aimed to improve safety and visibility for both drivers and pedestrians. ADVANTEC designed the new traffic signal equipment and upgraded signing/striping to the latest standards, recommended protected left-turn phasing, installed both countdown pedestrian heads and pedestrian push buttons, and installed advanced dilemma zone detection at the intersection. All traffic signal equipment and ITS devices were designed to be integrated with the City’s Traffic Management Center (TMC), where the systems can be managed and controlled by the TMC operator(s). As an added value, ADVANTEC assisted in the design and coordination of the equipment so that it was incorporated into the CV Sync Phase II Project that is being spearheaded by the Coachella Valley Association of Governments (CVAG).

On-Call Traffic Engineering Services (Rancho Mirage, CA )- Project Director. As part of the City of Rancho Mirage On-Call Traffic Engineering Services, ADVANTEC provided numerous traffic signal and signing and striping plans, technical specifications, and engineer’s estimates for multiple intersection improvements. The crucial projects included improvements of the traffic signal equipment, signal communication upgrades, and replacement of pedestrian ramps. In addition, ADVANTEC prepared Left -Turn Signal Phasing Guidelines, Stop Control Warrants Studies, Traffic Signal Warrants Studies, Line -of-Sight Study, and provided Traffic Impact Analysis Review for multiple projects in the city. ADVANTEC was responsible for a Multi-Way Stop Control Warrant Analysis report and a concept plan with recommendations for pedestrian safety enhancements.

Traffic Signal Upgrades (HSIP Cycle 9) Project (Desert Hot Springs, CA) – Project Director. ADVANTEC was responsible for the preparation of plans, specifications, and engineer’s estimates (PS&E) for traffic signal equipment and detection upgrades, and improvements for ADA compliance. Project improvements will be provided at six signalized intersections including replacing existing pedestrian indications with countdown style pedestrian indications, replacing existing pedestrian push buttons with accessible pedestrian signals (APS), installing new bicycle and vehicle detector loops, installing new continental crosswalks and limit lines, and adding detectable warning surfaces on existing ADA ramps. The implementation of these improvements will help improve multimodal mobility, safety, and operational efficiency at signalized intersections, especially for pedestrians and bicyclists.
377

John A. Dorado, PE
Task Leader for Traffic Engineering Services

Mr. John Dorado is a Senior Project Manager. Mr. Dorado is a dedicated and technically skilled business professional with over 25 years of experience in the field of Intelligent Transportation Systems (ITS) engineering, planning and design, traffic engineering, and transportation planning. He provides a balanced understanding of projects within the public and private sectors and skillfully meets challenges and creates positive change. He is creative and detail- oriented with a record of success in project management, on-time and on-budget project delivery, and has a proven ability to foster strong positive client relations. Some of his notable projects are as follows:

RELEVANT EXPERIENCE
On Call Traffic Engineering Services, Riverside County Transportation Department (Riverside, CA) – Task Leader. ADVANTEC was selected by the Riverside County Transportation Department (RCTD) to provide on-call traffic engineering services to augment its in-house resources with our strong traffic engineering expertise and capabilities to support the department’s project delivery as part of their 5 -year Transportation Improvement Program (TIP). Besides augmenting staff on-site at RCTD offices for their municipal engineering needs, ADVANTEC’s home office engineering team also provides the necessary design support for their project delivery process. We have completed several task orders for the County including Traffic Signal Timing Update, Traffic Signal Synchronization, Signal Communication Master Plan, Grant Application support, Project Management Staff Augmentation, Systemic Safety Analysis Report Update, Traffic Signal Controller/Timing Sheets Update, Traffic Signal Improvement Design, and Transparity Advanced Traffic Management System
Implementation Assistance. John is currently managing the Grand Avenue at Sangston Drive intersection improvement project which includes the preparation of traffic signal, street improvement, and signing and striping plans. Additionally, the project include d field review, utility coordination, construction support, and signal timing sheets. ADVANTEC worked with CL Surveying for the surveying and topographic mapping of the intersection.

On-Call Traffic Engineering Services (Claremont, CA) - Project Manager. As part of the City of Claremont On-Call Traffic Engineering Services, Mr. Dorado is responsible for providing multiple traffic signal and signing and striping plans, technical specifications, and engineer’s estimates for multiple intersection improvements. The projects included improvements of the traffic signal equipment, signal communication upgrades, and replacement of pedestrian ramps. In addition, ADVANTEC has prepared Stop Control Warrants Studies, Traffic Signal Warrants Studies, Trail Crossings, Intersection Analysis, Corridor Safety Analysis, Line-of-Sight Analysis, Railroad Crossing Study, and has provided Traffic Impact Analysis Review for multiple projects in the city. In addition, ADVANTEC has provided signal timing plans for multiple signalized intersections. Some recent services include: Citywide Speed Survey, Citywide Neighborhood Traffic

Registration:

California, Civil Engineering
No. 74405
IMSA Certified Traffic Signal
Field Technician Level II,
No. BE_106965
IMSA Certified Traffic Signal
Technician Level I,
No. AA_106965
IMSA Certified Work Zone
Temporary Traffic Control
Technician, No. ZZ_106965

Years of Experience: 25
Years with Firm: 8

Education:

California State University,
Fullerton, CA – 1999, BS Civil
Engineering

Professional Affiliations:

Institute of Transportation
Engineers (ITE)
Orange County Traffic
Engineering Council (OCTEC)
International Municipal Signal
Association (IMSA)
378

Calming Program and Policym Speeding Enforcement Analysis, Corridor Studies that include evaluating vertical and horizontal roadway curvature, line -of-sight, level-of-service, queuing, signing, striping, bicycle safety, speeding, traffic calming, safety enhancements. Intersection Studies that include evaluating pedestrian crossings, sight distance, queuing and clear zone, speeding, traffic calming, signing, striping, warrants, and operations. Recommendations for each location are provided as conceptual plans based on the results of the analysis. Traffic Signal Design (PS&E) – Prepared plans, specifications, and estimates (PS&E) related to the project improvements for multiple intersections Citywide. Improvements included left turn phasing, controller upgrades, pedestrian heads, vehicle heads, APS push buttons, and Video Detection Systems Signal Timing plans were also prepared for each project. Construction Support – Provided construction support services to the City during construction of a new traffic signal. Services included show drawing review, responses to Request for Information (RFI), answered any questions during construction and coordination with the Construction Manager and Contractor.

On-Call Traffic Engineering Services, Rancho Mirage, CA - Project Manager. As part of the City of Rancho Mirage On-Call Traffic Engineering Services, ADVANTEC provided numerous traffic signal and signing and striping plans, technical specifications, and engineer’s estimates for multiple intersection improvements. The crucial projects included improvements of the traffic signal equipment, signal communication upgrades, and replacement of pedestrian ramps. In addition, ADVANTEC prepared Left -Turn Signal Phasing Guidelines, Stop Control Warrants Studies, Traffic Signal Warrants Studies, Line -of-Sight Study, and provided Traffic Impact Analysis Review for multiple projects in the city. ADVANTEC was responsible for a Multi-Way Stop Control Warrant Analysis report and a concept plan with recommendations for pedestrian safety enhancements.

Additionally ADVANTEC prepared a Line of Sight Analysis and provided recommendations to improve sight conditions.

Coachella Valley Association of Governments (CVAG) Smart Region Program – Phases I, II and III (Coachella Valley, Riverside County, CA)- Deputy Project Manager. CVAG has embarked on a major effort to advance the development Smart Mobility and implementation of Intelligent Transportation Systems in the Coachella Valley with an emphasis in the development of a “Smart Region” and prepare the region for integration of current and upcoming multi-modal transportation/transit technologies, smart weather, parking and lighting systems, broadband communications, and smart mobility programs. The CV Sync Program is one of the most advanced Smart Region Programs in North America where CVAG is implementing smart transportation technologies with Artificial Intelligence (AI), Cloud Services, Software -as -a-Service (SaaS), and a very robust Cyber Security System that includes Cyber Security Policies and a Credential System. As part of this program, ADVANTEC developed the Regionwide ITS Master Plan that will be used as a planning tool to prepare local agencies and CVAG for future emerging transportation technologies including nine (9) Traffic Operation Centers (TOC), One (1) Regional Traffic Management Center(TMC), Transit Signal Priority (TSP), Cloud Services, Software-as-a-Service (SaaS), Cyber Security, connected and automated vehicles (CAV), Big Data, integrated corridor management (ICM), Mobility-as-a-Service (MaaS), Mobility on Demand (MOD), regionwide Broadband communications, and Smart Cities initiatives. The Program consisted of thirty-five major tasks including: CVAG Traffic Signal Interconnect Master Plan, System Engineering Management Plan (SEMP), Concept of Operations (ConOps) and Strategic Deployment Plan, System Requirements, Environmental, Preliminary Engineering, Technology Assessment and Evaluation (including Intelligent Transportation systems, CAV, and Smart Cities), Systems Integrator Procurement and Design, System Implementation, Construction Management and Inspection, Traffic Signal Synchronization, Operations and Maintenance, and preparation of project website. ADVANTEC prepared final plans, specifications, and engineer’s estimates (PS&E) for Phase I (completed) and includes three major corridors and 138 signalized intersections. ITS elements consist of open architecture and state-of-the-art 2070 and NEMA ATC units with Application Programing Interface (API), Openly sharing Management Information Base (MIBs) at no cost to CVAG, C -V2X Roadside Units (RSUs) with Bluetooth, Wi Fi, GPS and Transit Signal Priority (TSP), Smart Closed- Circuit Television (CCCTV) systems with analytics, Arterial Performance Measurement Systems (APEMS), 379

Changeable Message Signs (CMS), Video/Radar Detection Systems, secured Ethernet fiber optic communications and the Regional TMC and nine (9) local TOCs. Phase II (under construction) includes upgrades of 260 traffic signal systems, installation/upgrade of approximately 240-miles of signal communications, and installation of various ITS field elements, including closed -circuit television systems, dynamic/changeable message signs, arterial management systems, detection systems, and C -V2X RSUs .

Phase II also includes the planning, design and implementation of Broadband Communications along 21 corridors in the Coachella Valley. Phase III consists of 3 corridors and 27 signalized intersections. Overall, ADVANTEC has designed over 400 miles of fiber optic communications and 12,000 ITS elements (including over 400 RSUs) with individual Barcode and IP address . ADVANTEC formed a Transportation Systems Management and Operations (TSM&O) Working Group formed of CVAG staff, and county and cities staff to provide education materials, facilitate project delivery, approval of regionwide technology standards, and development of the cooperative agreement . ADVANTEC has provided presentations to multiple decision makers that are part of the various Transportation Committees and Executive Committee at CVAG. The Master Plan and Cooperative Agreement were approved by two transportation committees; and by the Executive Committee. As part of the CV Sync Program, ADVANTEC has developed a Regionwide Traffic Signal Timing Parameters Guidelines, traffic signal timing/synchronization plans, and has synchronized the Phase I Corridors (140 traffic signals), and we are planning to synchronize Phase II Corridors (260 traffic signals) in 2025. In addition, ADVANTEC is supporting CVAG and the cities providing Special Event Management. Our staff has participated managing vehicle, pedestrian and bicyclist traffic, parking, and circulation during the City of La Quinta Ironman, City of Indian Wells BNP Open, and planning to support the Coachella Music Festivals and Stagecoach starting in 2025.

On-Call Traffic Engineering Services (Menifee, CA) – Project Manager. Mr. Dorado is responsible for providing on-call traffic engineering services to the City of Menifee. Some of our recent services include: Review of City standards, specifications, existing traffic signal equipment, and the traffic operations center and providing recommendations. ADVANTEC is also verifying existing communication links that are currently offline, and providing recommendations to provide and stabilize communications. In addition, ADVANTEC is reviewing the City's recently implemented traffic signal timing and synchronization done by another consultant , in which the City is not happy with. As part of our services, we are review ing the traffic model by others, and providing recommended improvements.

On-Call Traffic Engineering Services (Huntington Beach, CA) – Project Manager. Mr. Dorado is responsible for providing on-call traffic engineering services to the City of Huntington Beach. As part of our on-call traffic engineering contract, ADVANTEC provided Systems Engineering and design services (PS&E) for various projects in the City of Huntington Beach. The projects included ITS upgrades at these locations: City Hall to the downtown area and City building and facilities; Oak View Community Center and City Well Site; City Hall to Utility Yard; and TS Signal Upgrades along Garfield Avenue . These projects consisted of installing fiber optic cable and conduit, traffic signal controllers, and ethernet switches. ADVANTEC also ensured network improvements were compatible, expandable, and scalable for the City’s traffic management and monitoring systems, and for the City’s Information Technology (IT) network.

This included fiber assignments and management, connectivity, and setup of virtual local area networks (VLAN), and internet protocol (IP) addressing. This configuration was established to virtually separate data/video from the traffic and ITS infrastructure, and the data/information/video from City’s buildings and facilities. Strategies were also implemented for cyber security and redundant communications. These projects were strategic to the City's Fiber and Communications Master Plan and expanded their fiber optic infrastructure to the various areas throughout the City.

These projects required close coordination with the City’s IT staff and building department during the design, and network development stages. In addition, coordination with Caltrans was required to obtain encroachment permits for the work along Pacific Coast Highway and Beach Boulevard. 380

John T Cox IV
Task Leader – Traffic Signal Systems/
Design & Maintenance
Mr. Cox is a Systems Engineer for ADVANTEC who specializes in Intelligent Transportation Systems, Communications, Fiber Optic Technologies, Closed Circuit Television, Changeable Message Signs, Wireless Broadband Ethernet, Traffic Management Center Systems I ntegration and various Advanced Traffic Management System hardwa re/software suites. With extensive experience in the transportation industry, Mr. Cox has been involved in dozens of transportation and traffic engineering projects that include both design and execution of Traffic Signal, ITS, CCTV , CMS, TMS and Fiber Optic Communications . Mr. Cox has integrated and maintained such systems in support of centralized signal control deployments.

Additionally, he has extensive background in the public sector, where he designed and maintained the Traffic Management Center of the City of Costa Mesa for over 11 years. The following provides a summary of his successful project deliveries for clients over the past 2 4 years:

RELEVANT EXPERIENCE
Coachella Valley Association of Governments (CVAG) Smart Region Program – Regional Broadband Communications (Coachella Valley, Riverside County, CA) – Systems Engineer. As part of the Region’s Smart Region Program, ADVANTEC is providing planning and design professional services for the implementation of Broadband Communications along 24 Corridors in the Coachella Valley. The first project is funded by the State of California Middle Mile Grant to design Broadband Communications along Highway 111 from the cities of Palm Springs to Coachella. ADVANTEC is supporting CVAG to extend the region’s broadband program to t he Salton Sea.

Coachella Valley Association of Governments (CVAG) Smart Region Program – Phases I, II and III (Coachella Valley, Riverside County, CA) - Systems Engineer. CVAG has embarked on a major effort to advance the development Smart Mobility and implementation of Intelligent Transportation Systems in the Coachella Valley with an emphasis in the development of a “Smart Region” and prepare the region for integration of current and upcoming multi-modal transportation/transit technologies, smart weather, parking and lighting systems, broadband communications, and smart mobility programs. The CV Sync Program is one of the most advanced Smart Region Programs in North Americ a where CVAG is implementing smart transportation technologies with Artificial Intelligence (AI), Cloud Services, Software -as -a-Service (SaaS), and a very robust Cyber Security System that includes Cyber Security Policies and a Credential System. As part of this program, ADVANTEC developed the Regionwide ITS Master Plan that will be used as a planning tool to prepare local agencies and CVAG for future emerging transportation technologies Registration:

IMSA Level II Technician
#BE-864-17
IMSA Work Zone Certified
#AA -86417
Corning Inc.

International Fiber Systems
(IFS)
Years of Experience: 25
Years with Firm: 11
Education:

Fullerton College
Engineering Technology
Rancho Santiago College
Project Management
Professional Affiliations:

International Municipal Signal
Association (IMSA)
Institution Traffic Engineers
(ITE)
Orange County Traffic
Engineers Council (OCTEC)
Intelligent Transportation
Systems California (ITS CA)
381

including nine (9) Traffic Operation Centers (TOC), One (1) Regional Traffic Management Center(TMC), Transit Signal Priority (TSP), Cloud Services, Software -as-a-Service (SaaS), Cyber Security, connected and automated vehicles (CAV), Big Data, integrated corridor management (ICM), Mobility -as-a-Service (MaaS), Mobility on Demand (MOD), regionwide Broadband communications, and Smart Cities initiatives. The Program consisted of thirty-five major tasks including: CVAG Traffic Signal Interconnect Master Plan, System Engineering Management Plan (SEMP), Concept of Operations (ConOps) and Strategic Deployment Plan, System Requirements, Environmental, Preliminary Engineering, Technology Assessment and Evaluation (including Intelligent Transportation systems, CAV, and Smart Cities), Systems Integrator Procurement and Design, System Implementation, Construction Management and Inspection, Traffic Signal Synchronization, Operations and Maintenance, and preparation of project website. ADVANTEC prepared final plans, spec ifications, and engineer’s estimates (PS&E) for Phase I (completed) and includes three major corridors and 138 signalized intersections. ITS elements consist of open architecture and state-of-the-art 2070 and NEMA ATC units with Application Programing Interface (API), Openly sharing Management Information Base (MIBs) at no cost to CVAG, C -V2X Roadside Units (RSUs) with Bluetooth, Wi Fi, GPS and Transit Signal Priority (TSP), Smart Closed- Circuit Television (CCCTV) systems with analytics, Arterial Performance Measurement Systems (APEMS), Changeable Message Signs (CMS), Video/Radar Detection Systems, secured Ethernet fiber optic communications and the Regional TMC and nine (9) l ocal TOCs. Phase II (under construction) includes upgrades of 260 traffic signal systems, installation/upgrade of approximately 240-miles of signal communications, and installation of various ITS field elements, including closed-circuit television systems, dynamic/changeable message signs, arterial management systems, detection systems, and C -V2X RSUs . Phase II also includes the planning, design and implementation of Broadband Communications along 21 corridors in the Coachella Valley. Phase III consists of 3 corridors and 27 signalized intersections. Overall, ADVANTEC has designed over 400 miles of fiber optic communications and 12,000 ITS elements (including over 400 RSUs) with individual Barcode and IP address . ADVANTEC formed a Transportation Systems Management and Operations (TSM&O) Working Group formed of CVAG staff, and county and cities staff to provide education materials, facilitate project delivery, approval of regionwide technology standards, and development of the cooperative agreement. ADVANTEC has provided presentations to multiple decision makers that are part of the various Transportation Committees and Executive Committee at CVAG. The Master Plan and Coo perative Agreement were approved by two transportation committees; and by the Executive Committee . As part of the CV Sync Program, ADVANTEC has developed a Regionwide Traffic Signal Timing Parameters Guidelines, traffic signal timing/synchronization plans, and has synchronized the Phase I Corridors (140 traffic signals), and we are planning to synchronize Phase II Corridors (260 traffic signals) in 2025. In addition, ADVANTEC is supporting CVAG and the cities providing Special Event Management. Our staff ha s participated managing vehicle, pedestrian and bicyclist traffic, parking, and circulation during the City of La Quinta Ironman, City of Indian Wells BNP Open, and planning to support the Coachella Music Festivals and Stagecoach starting in 2025.

Citywide HSIP Signal Interconnect Improvements Project (La Quinta, CA) – Systems Engineer. ADVANTEC is responsible for a technology evaluation and assessment, the preparation of plans, specifications and engineer’s estimates (PS&E), and the preparation of environmental documents in accordance with the National Environmental Policy Act (NEPA) for the improvements associated with City’s HSIP Interconnect Project. The proposed project will upgrade the City of La Quinta’s existing signal interconnect network to fiber optic communications (using new and existing conduit) linking 52 signalized intersections, installing two communication hubs, and communication hardware and software at the City’s Traffic Management Center.

The communication upgrades will provide the City with a state-of-the-art Ethernet/Internet Protocol (IP) communications system that will be expandable and scalable for future ITS technologies. This project is fully funded through the Federal Highway Administration Safety Improvement Program (HSIP), and requires in- depth knowledge and compliance with Caltrans Local Assistance Procedures Manual, the Caltrans Construction Manual, and other Federal Highway Administration (FHWA) requirements. Additionally, the project requires preparation of the necessa ry environmental documentation per the National Environment Policy Act (NEPA) and California Environmental Quality Act (CEQA).
382

Traffic Monitoring Center (TMC) Design, Riverside County Transportation Department , Riverside County, CA – Design/Systems Engineer. As part of a new Riverside County facility building project, Mr. Cox was tasked as Design Engineer to create design plans for the implementation of a new Traffic Monitoring Center. This essential new center provided remote monitoring, observed real-time conditions and adjusted signal timing to improve signal operations to over 550 traffic signals operated by Riverside County .

Citywide Smart City Projects (Huntington Beach , CA) – Systems Engineer. ADVANTEC provided Systems Engineering and design services (PS&E) for various projects in the City of Huntington Beach. The projects consisted of installing fiber optic cable and conduit, traffic signal controllers, and ethernet switches.

ADVANTEC also ensured network improvements were compatible, expandable, and scalable for the City’s traffic management and monitoring systems, and for the City’s Information Technology (IT) network. This included fiber assignments and management, connectivity, and setup of virtual local area networks (VLAN), and internet protocol (IP) addressing. This configuration was established to virtually separate data/video from the traffic and ITS infrastructure, and the data/information/video from City’s buildings and facilities. Strategies were also implemented for cyber se curity and redundant communications. These projects were strategic to the City's Fiber and Communications Master Plan and expanded their fiber optic infrastructure to the various areas throughout the City. These projects required close coordination with the City’s IT staff and building department during the design, and network development stages. In addition, coordination with Caltrans was required to obtain encroachment permits for the work along Pacific Coast Highway and Beach Boulevard.

Communication Master Plan (Riverside County, CA) – Systems Engineer. ADVANTEC is currently preparing a plan to provide all unincorporated western Riverside County traffic signals with data communication for the purpose of remote monitoring. The project’s primary goal is to provide timely notification of power loss events so the traffic signal maintenance division can address them before the battery back -up units are exhausted.

The intersections are grouped into tiers, with short -term and long -term communication strategies identified for each tier. Short -term strategies focus on leased/cellular facilities to minimize lead time. Long -term strategies focus on agency-owned communication to minimize recurring cost. As part of our role, ADVANTEC is coordinating with Riverside County’s Information Technology group to ensure the recommendations are in conformance with County technology policy, and reaching out to vendors to advise County staff on available technology. Key features includes Traffic Signal Monitoring and Control, Wireless and Fiber Optic Ethernet media, Coordination with Enterprise IT staff, Hardware and software vendor interfacing , Cost estimating/budgeting for technology procurement , and prioritization of intersections by need.

Citywide Fiber Optic Communication s and Signal System Upgrade (Lancaster, CA) – Project Manager. The City of Lancaster received two grants from LA-METRO to update its traffic signal system: The North County ITS Expansion Project and the Traffic Signal System Modernization Project. These two citywide projects consisted of preparation of Plans, Specifications and Estimates for installation of 35 miles of fiber optics communications, wireless communications, CCTV cameras, and upgrade of traffic signal central system and controllers for 140 signalized intersections. Project scope included: field inventory of all existing signal cabinets, tracing of existing copper interconnect and fiber optic cables between signal cabinets, measuring distances between pull boxes, inventory of Communication hub cabinets, and inventory of City Hall and City Yard traffic signal communications equipment.
383

Madele ine Ortiz
Key Support Staff – Project Engineer
Ms. Madeleine Ortiz is a Project Engineer for ADVANTEC with 8 years of experience in transportation, traffic engineering , and Intelligent Transportation Systems (ITS) projects . Her expertise in projects related to ITS, traffic signal design, signing and striping, traffic control, traffic signal synchronization, and various transportation studies have resulted in dozens of successful project deliveries throughout her career. Ms. Ortiz has proven her ability to help manage multiple projects , deliver projects within deadlines and budget, and work functionally both with her project team and clients .

RELEVANT EXPERIENCE
Grand Ave at Sangston Dr Traffic Signal Improvements, Riverside County Transportation Department (RCTD), Lake Elsinore, CA – Project Engineer. As part of the on -call services contract, ADVANTEC was responsible for the preparation of plans, specifications, and estimates (PS&E) for the installation of a new traffic signal at Grand Avenue and Sangston Drive in the City of Lake E lsinore. The improvements required the preparation of traffic signal, street improvement, and signing and striping plans. Additionally, the project included field review, utility coordination, construction support, and signal timing sheets. ADVANTEC worked with CL Surveying for the surveying and topographic mapping of the intersection.

Solar Powered Overhead Pedestrian Beacons/High-Intensity Activated Crosswalk (HAWK) Signal Systems Design Project (Corona, CA) – Project Engineer. ADVANTEC provided professional engineering services to design and prepare plans, specifications, and construction cost estimates (PS&E), and construction support for the City of Corona’s Solar Powered Overhead Pedestrian
Beacons/High-Intensity Activated Crosswalk (HAWK) Signal Systems Design Project. The purpose of the project was to improve the safety and visibility of pedestrians and bicyclists by installing a High Intensity Activated Crosswalk (HAWK) signal crossing at five (5) mid- block locations. The proposed project improvements included installation of the pole, mast arm, beacons, countdown pedestrian signal heads, Audible Pedestrian Signal (APS) pedestrian push buttons, luminaires, American with Disabilities Act (ADA) compliant pedestrian ramps, pole -mounted traffic signal cabinet, solar panels, advanced traffic signal controller, new conduit and pull boxes , and new signing and striping. The improvements included removing existing in- pavement lighting and all appurtenances.

On-Call Transportation and Engineering Services, PS&E, Huntington Beach, CA - Project Engineer/Assistant Project Manager. As part of the City of Huntington Beach On -Call Transportation and Engineering Services,

Registration:

Engineer -in-Training (CA)
#161349

IMSA Certified Work Zone
Temporary Traffic Control
Technician, No. ZZ_122805

IMSA Traffic Signal Technician
Level I, No. AA_122805

Years of Experience: 9
Years with Firm: 6

Education:

B.S., Civil Engineering,
University of California, Irvine,
2016

Professional Affiliations:

Orange County Traffic
Engineering Council (OCTEC)

American Society of Civil
Engineers (ASCE)

Institute of Transportation
Engineers (ITE)

384

ADVANTEC was tasked with the preparation of fiber optic design plans, traffic signal plans, technical specifications, and engineer’s estimates for multiple intersection improvements. The crucial projects included improvements of the traffic signal equipment and signal communication upgrades for multiple segments throughout the City. As Pro ject Engineer, Madeleine was responsible for attending the project kick- off meetings, project coordination, and managed the project team to deliver a quality PS&E.

Madeleine also assisted with the preparation of the plans, specification, and estimates for multiple projects under the on -call. She was also responsible for assisting the Project Manager with the QA/QC process.

On-Call Transportation and Engineering Services, Claremont, CA – Project Engineer/Assistant Project Manager. ADVANTEC was responsible for providing the on -call traffic engineering services to improve traffic flow and safety for the City of Claremont. The services consisted of: preparation or review of PS&E for traffic engineering projects, traffic and transpor tation planning studies, traffic signal timing and signal coordination plans, conceptual design plans/exhibits, cost estimates and value engineering services and support and preparation of record drawings. As Associate Engineer, Madeleine was responsible for the preparation of plans, specification and estimates, assisted with the review of improvement plans, conducted traffic engineering studies such a s Flashing Yellow Arrow study, left -turn phasing analysis, and crossing guard study.

On-Call Traffic Engineering Services , Rancho Mirage, CA - Project Engineer. As part of the City of Rancho Mirage On-Call Traffic Engineering Services, ADVANTEC provided numerous traffic signal and signing and striping plans, technical specifications, and engineer’s estimates for multiple intersection improvements. The crucial projects included improvements of the traffic signal equipment, signal communication upgrades, and replacement of pedestrian ramps. In addition, ADVANTEC prepared Left -Turn Signal Pha sing Guidelines, Stop Control Warrants Studies, Traffic Signal Warrants Studies, Line -of-Sight Study, and provided Traffic Impact Analysis Review for multiple projects in the city. Madeleine was responsible for a Multi-Way Stop Control Warrant Analysis report and a concept plan with recommendations for pedestrian safety enhancements.

Madeleine was also responsible for the preparations of a Line of Sight Analysis and provided recommendations to improve sight conditions.

Traffic Signal Modification Highway Safety Improvement Project (HSIP) Cycle 9 Project at 10 Locations, PS&E Cathedral City, CA - Associate Engineer. ADVANTEC was responsible for the design of safety upgrades at 10 intersections in the City of Cathedral City. The purpose of the project was to improve safety and visibility of the traffic signals by installing American with Disabilities Act (ADA) compliant pedestrian ramps, upgrading traffic signal equipment and signing/striping to the latest standards, protective/permissive or protected left turn phasing, installation of new countdown pedestrian heads, pedestrian push buttons, and installation of advanced dilemma zone detection for high speed approaches at the following ten (10) intersections . As Associate Engineer, Madeleine was responsible for design of the improvements and preparation of technical specification, estimates, left -turn phasing analysis, and work related to environmental documentation.

Replacement of Pedestrian Signal Heads (HSIP Cycle 9) Project, La Habra, CA – Project Engineer.

ADVANTEC is providing traffic engineering and public works services; including the preparation of plans, specifications and estimates (PS&E); and providing Local Assistance support for the City’s Replacement of Pedestrian Signal Heads (HSIP Cycle 9) project. The purpose of this project is to enhance active transportation, multimodal mobility, safety, and operational efficiency at signalized intersections, especially for pedestrians and bicyclists. Project improvements include new pedestrian countdown heads and ADA compliant audible pedestrian push button systems at eight (8) signalized intersections. 385

Ryan Miller
Key Support Staff – Project Engineer
Ryan Miller is a project engineer with experience in tra ffic engineering studies, traffic signal synchronization and operations, and ITS design.

Ryan has 13 years of experience and has worked on multiple traffic signal synchronization studies . He is an expert in the use of Synchro, SimTraffic and Tru-Traffic software. His Traffic and Design software experience also includes AutoCAD, Civil3D, and MicroStation.

RELEVANT EXPERIENCE
Riverside County Transportation Department , On -Call Traffic Engineering Services (Riverside, CA) – Project Engineer. ADVANTEC was selected by the Riverside County Transportation Department (RCTD) to provide on-call traffic engineering services to augment its in-house resources with our strong traffic engineering expertise and capabilities to support the department’s project delivery as part of their 5-year Transportation Improvement Program (TIP). Besides augmenting staff on- site at RCTD offices for their municipal engineering needs, ADVANTEC’s home office engineering team also provides the necessary design support for t heir project delivery process. We have completed several task orders, including:
•Traffic Signal Timing Update – Updated and prepared new signal timing sheets for 148 county signal locations based on CA -MUTCD, including calculation of yellow times, pedestrian crossing distances and clearance timing, bicycle crossing distance and minimum green, and values for Red-Revert and All-Red Start times.
•Traffic Signal Synchronization - Developed synchronization timing plans for multiple county roadway segments, such as Murrieta Hot Springs Road, Van Buren Blvd, Cajalco Road, Monterey/Varner/I -10 interchange, Stetson Avenue, Cook Street/Varner/I -10 interchange including Caltrans freewa y ramp signals. Tasks performed included:
collection of ADT counts and turning movement counts,
development of optimized timing plans for 3 peak periods (AM, Midday and PM), preparation of timing sheets, assisting county staff in implementation of new timing, and fine -tuning of implemented synchronization plans. ADVANTEC also provided training on signal synchronization process for county staff.
•Signal Communication Master Plan: Prepared a technologies assessment report to provide countywide access to remote traffic signal locations, and design of countywide wireless communication network that enable county staff to monitor traffic signal operations and maintenance, and in-cabinet equipment monitoring (Battery Backup, conflict monitor, etc.).
•Grant Application support – Prepared and submitted multiple grant applications for RCTD to secure transportation improvement funds for the Department’s TIP.
•Project Management Staff Augmentation – Provided as -needed engineering services to Project Development section, including Registration:

Engineer -in-Training (CA)
#138331
IMSA Certified Work Zone
Temporary Traffic Control
Technician, No. ZZ_129800
Years of Experience: 13
Years with Firm: 12
Education:

B.S., Civil Engineering,
California State Polytechnic
University, Pomona, 2009
Professional Affiliations:

Institute of Transportation
Engineers (ITE)
American Society of Civil
Engineering (ASCE)
Orange County Traffic
Engineers Committee (OCTEC)
386

project budget, manage consultant’s design, coordinate environmental documents, oversee preparation of PS&E documents, monitor and manage resource allocation. • Systemic Safety Analysis Report Update – Prepared updated report with current collision data, identified high-collision intersections and roadway segments, and developed countermeasures for safety projects. • Traffic Signal Controller/Timing Sheets Update – Converted and prepared signal timing sheets for new 2070 ATC controllers at 25 traffic signals countywide.
• Traffic Signal Improvement Design – Prepared traffic signal, street improvement, and signing and striping plans, including final plans, specifications, and estimates, and provided support for bidding and construction. Recent locations include Highway 74 & Mountain Avenue, Pourroy Road & Po urroy Road, and Grand Avenue & Sangston Drive.
• Transparity Implementation Assistance – Assisted in implementation of Transparity ATMS software for western county. Conducted field reviews and assisted County staff in the configuration of traffic signal and communications equipment.

Traffic System Monitoring and Operations
City of Chino Hills, Citywide Traffic Signal Operations , CA – Project Engineer. ADVANTEC has provided traffic signal system monitoring and operations for City of Chino Hills, since 2010. Specific tasks include:
• Central System Monitoring: Check existing signal timing, functionality of each detector, and coordination parameters at least once a week or upon request by the City, either in the field (if signal is off-line), or at our office (if signal is on-line), within 24 hours from time of request. • Aries System Updating: Update intersection graphical displays, detectors assignments, timing -plans, etc. to ensure all information is up-to-date and provide technical support. • Signal Timing: Make minor adjustments of timing parameters, e.g. offsets, splits, timing plans, to improve and ensure traffic progression upon request by the City. Maintain signal timing charts in each cabinet and a copy submitted to the City’s Engineering Department. • Data Management and System Communication: perform upload and download of traffic data including, but not limited to, traffic volume counts and occupancy reports, from the signal controllers. Maintain communications between master controllers and central s ystem. • Trouble Shooting: As requested by the City, the consultant shall perform trouble shooting of a signal either in office, in the field, or both to address specifically reported problems. The consultant shall make recommendations for remediation to City sta ff and implement changes as approved by City staff.

ADVANTEC also performed additional services, on an as -needed basis, related to Traffic signal design and plan check, and Traffic signal construction management and inspection services.

Performance Duration: 2010 - Ongoing
Consulting Fee: $23,000/year
Construction Cost: N/A

City of Glendale, On -Call Traffic Engineering Services (Glendale, CA ) – Project Engineer. ADVANTEC was selected by the City of Glendale Public Works Department to provide traffic engineering support services, such as traffic and transportation planning, traffic engineering design, traffic operations analysis, and traffic study reports, as requested. We have completed several task orders, including conversion of timing sheets to new ATC controllers, review of Bus Priority parameters, and review and adjustme nt of timing parameters for implementation of Lead Pedestrian Interval at the downtown area.

387

1200 Roosevelt • Irvine, CA 92620
Tel: (949) 861-4999
21700 Copley Drive, Suite 300 • Diamond Bar, CA 91765 Tel: (909) 860-6222
73710 Fred Waring Dr., Suite 110, Palm Desert, CA 92260 Tel: (760) 404-0630
www.advantec-usa.com
Smart Cities
Connected Vehicles
Traffic Engineering
Traffic Signal Synchronization
Intelligent Transportation System
Transportation Planning/ Design LA
Active Transportation
Civil Engineering
Highway Engineering
Public Works
Transit
Broadband Communications
388

14 ADVANTEC Consulting Engineers Inc.

Rev. 01/2024

EXHIBIT B

INSURANCE REQUIREMENTS
389

EXHIBIT B

INSURANCE REQUIREMENTS
A.Minimum Scope and Limits of Insurance
City reserves the right to review any and all of the required insurance policies and/or endorsements, but has no obligation to do so. Failure to demand evidence of full compliance with the insurance requirements set forth in this Agreement or failure to identify any insurance deficiency shall not relieve Consultant from, nor be construed or deemed a waiver of, its obligation to maintain the required insurance at all times during the performance, including any extension thereof, of this Agreement.

Consultant shall obtain, maintain, and keep in full force and effect during the life of this Agreement, including any extension thereof, all of the following minimum scope of insurance coverages:

1.Commercial General Liability Insurance
Broad-form commercial general liability, with coverage at least as broad as the most current version of ISO Commercial General Liability coverage form CG 00 01, in a form at least as broad as ISO form CG 00 01 04 13, and shall include insurance for premises and operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury or bodily injury, and personal and advertising injury with a policy limit of not less than Two Million Dollars ($2,000,000.00) per occurrence and Four Million Dollars ($4,000,000.00) general aggregate. The aggregate limit, encompassing the above coverage, shall apply separately to this project/location. If Consultant maintains higher limits than the specified minimum limits, City requires and shall be entitled to coverage for the higher limits maintained by the Consultant.

2.Business Automobile Liability Insurance
Business automobile liability for all owned, hired, leased, and non-owned vehicles at least as broad as the most current version of ISO Business Auto Coverage Form CA 00 01, with a policy limit of not less than Two Million Dollars ($2,000,000.00) combined single limit per accident. If Consultant maintains higher limits than the specified minimum limits, City requires and shall be entitled to coverage for the higher limits maintained by the Consultant.

3.Workers’ Compensation and Employer’s Liability Insurance Workers’ compensation insurance as required by the State of California and Employer’s Liability Insurance with a minimum limit of One Million Dollars ($1,000,000.00) per accident for any employee or employees of Consultant. Consultant agrees to waive and to obtain endorsements from its workers’ compensation insurer waiving subrogation rights under its workers’ compensation insurance policy against the City, its officers, officials, agents, employees, and volunteers for losses arising from work performed by Consultant for the City and to require each of its subcontractors, if any, to do likewise under their workers’ compensation insurance policies.
390

By signing this Agreement, the Consultant acknowledges and agrees to the following:

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

The Consultant shall also comply with Section 3800 of the Labor Code by securing, paying for, and maintaining in full force and effect for the duration of this Agreement, complete workers’ compensation insurance, and shall furnish a certificate of insurance to the Project Manager before execution of this Agreement by the City. The City, its officers, officials, agents, employees, and volunteers shall not be responsible for any claims in law or equity occasioned by failure of the Consultant to comply with this Section.

4.Professional Errors and Omissions (“E&O”) Liability Insurance Professional errors and omissions (“E&O”) liability insurance on an occurrence based policy with policy limits of not less than Two Million Dollars ($2,000,000.00) per occurrence and Three Million Dollars ($3,000,000.00) policy aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability. The retroactive date must be shown, and this date must be before the date of the contract or the beginning of contract work. Insurance must be maintained and evidence of insurance must be provided for at least three (3) years after completion of the contract of work. If coverage is canceled or non-renewed, and not replaced with another policy form with a retroactive date prior to the contract effective date, the Consultant must purchase “extended reporting coverage” for a minimum of three (3) years after completion of contract work. A copy of the claims reporting requirements must be submitted to the Project Manager for review. If Consultant maintains higher limits than the specified minimum limits, City requires and shall be entitled to coverage for the higher limits maintained by the Consultant.

5.Standards for Insurance Companies
All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commission to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ rating of A-(or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide.

B.Documentation and Other Provisions

1.The commercial general liability insurance policy and business automobile liability policy shall be endorsed to contain the following: The City of Placentia, its officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied, or used by the Consultant; and automobiles owned, leased, hired, or borrowed by the Consultant. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance at least as broad as one of the following ISO ongoing operations forms: CG 20 10 or CG 20 26 or CG 20 33 (not allowed from 391

subcontractors), or CG 20 38; and one of the following ISO completed operations forms:

CG 20 37, 2039 (not allowed from subcontractors), or CG 20 40.

2.Said policies shall not terminate, nor shall they be cancelled or coverage reduced, without at least thirty (30) days’ written notice to the City. In the event of any cancellation or reduction in coverage or limits of any insurance, Consultant shall forthwith obtain and submit proof of substitute insurance. Should Consultant fail to immediately procure other insurance, as specified, to substitute for any cancelled policy or reduction in the required coverage limits, the City may procure such insurance at Consultant’s sole cost and expense.

3.The Consultant’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City of Placentia, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Placentia shall be excess and not contributing with the insurance provided by this policy.

4.Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Placentia, its officers, officials, agents, employees, and volunteers.

5.Defense fees and costs shall not deplete the limits of any insurance provided under this Agreement.

6.The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

7.Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure the City is an additional insured on insurance required from subcontractors.

8.Consultant agrees to waive, and to obtain endorsements from insurers waiving, subrogation rights against the City, its officers, officials, agents, employees, and volunteers for losses arising from work performed by Consultant for the City and to require each of its subcontractors, if any, to do likewise under their insurance policies.

9.Coverage shall be on a standard occurrence form.Claims-made forms are not acceptable. Modified, limited, or restricted occurrence forms are not acceptable. 392

15 ADVANTEC Consulting Engineers Inc.

Rev. 01/2024

EXHIBIT C

CERTIFICATES OF INSURANCE AND ENDORSEMENTS

393

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:CONTACT
(A/C, No):FAX
E-MAILADDRESS:

PRODUCER
(A/C, No, Ext):PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT

EROTH-STATUTEPER

LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED $PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-JECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
30 Day NOC / 10 Day for Nonpayment
394

BLANKET WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) The additional premium for this endorsement shall be _____% of the California workers compensation premium otherwise due on such remuneration, subject to a minimum charge of ________.

All written contracts in the state(s) of:

This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective Policy No.Endorsement No.

Insured
Countersigned By
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 99 06 31 (Ed. 6-20)
WC 99 06 31
(Ed. 6-20)
Includes copyright material of the Workers Compensation Insurance Rating Bureau of California.All rights reserved.

Insurance Company
Insurance Company

3.0 $250
CA
A0947-54-2011/12/24
ADVANTEC CONSULTING ENGINEERS, INC.
(A CORP)
1200 ROOSEVELT
IRVINE CA 926203667

MID-CENTURY INSURANCE COMPANY
395

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:CONTACT
(A/C, No):FAX
E-MAILADDRESS:

PRODUCER
(A/C, No, Ext):PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT

EROTH-STATUTEPER

LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED $PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-JECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
11/25/2024
AssuredPartners Design Professionals Insurance Services,LLC 3697 Mt.Diablo Blvd Suite 230
Lafayette CA 94549
Helen Jang
626-696-1892
[email protected]
License#:6003745 Continental Casualty Company 20443
ADVACON-05 Valley Forge Insurance Company 20508AdvantecConsultingEngineers,Inc. 949-861-4999
1200 Roosevelt
Irvine CA 92620
Travelers Casualty and Surety Co of America 31194
1243091200
B X 2,000,000
X 1,000,000
X Contractual Liab 10,000
X XCU Included 2,000,000
4,000,000
X
Y Y 6025396574 5/13/2024 5/13/2025
4,000,000
B 1,000,000
X X
X NoOwned Auto
Y Y 6025396574 5/13/2024 5/13/2025
A X X 5,000,000Y60253965885/13/2024Y 5/13/2025
5,000,000
X 10,000
C Professional Liability &
Pollution Liability included
Claims Made Form Y
Y 108033405 5/13/2024 5/13/2025 Per Claim/$2,000,000 $4,000,000/Agg lmt Insured owns no company vehicles;therefore,hired/non-owned auto is the maximum coverage that applies.Umbrella Policy is follow-form to its underlying Policies:General Liability/AUTO Liability.AM Best Ratings on all policies above:A/XII or greater.

Job:City of Plancentia:On Call Traffic Engineering Services.

City of Placentia,its officers,officials,agents,employees,and volunteers are named as an additional insured as respects general liability and auto liability as required per written contract.General Liability is Primary/Non-Contributory per policy form wording.Insurance coverage includes waiver of subrogation per the attached endorsement(s).
30 Day Notice will be sent to holder
City of Placentia
Attn:Anthony Peralta
401 E.Chapman Ave
Placentia CA 92870
396

PTC-1001 Ed. 11-08 Printed in U.S.A.Page 4 of 7
©2008 The Travelers Companies, Inc. All Rights Reserved D. the dates of the alleged events; and
E. the reasons for anticipating a Claim,
any Claim subsequently made against any Insured arising out of such Potential Claim will be deemed to have been made on the date such notice was received by the Company.

All notices under this section must be sent or delivered to the Company set forth in ITEM 3 of the Declarations and will be effective upon receipt.

IX.RELATED CLAIMS
All Claims or Potential Claims for Related Wrongful Acts will be considered as a single Claim or Potential Claim , whichever is applicable. All Claims or Potential Claims for Related Wrongful Acts will be deemed to have been made the date:

A. the first of such Claims for Related Wrongful Acts was made; or B. the first notice of such Potential Claim for Related Wrongful Acts was received by the Company, whichever is earlier.

X.SUBROGATION
In the event of payment under this policy,the Company is subrogated to all of the lnsured’s rights of recovery against any person or organization to the extent of such payment and the Insured will execute and deliver instruments and papers and do whatever else is necessary to secure such rights.The Insured will do nothing to prejudice such rights.

Section X. SUBROGATION does not apply if the Insured,prior to the date a Wrongful Act is committed, has waived its right of recovery for Damages that result from such Wrongful Act.

XI. RECOVERIES
All recoveries from third parties for payments made under this policy apply, after first deducting the costs and expenses incurred in obtaining such recovery:

A. first,to the Company to reimburse the Company for any Deductible amount it has paid on behalf of any Insured;
B. second,to the Insured to reimburse the Insured for the amount it has paid which would have been paid hereunder,but for the fact that such amount is in excess of the applicable limit hereunder; C. third,to the Company to reimburse the Company for the amount paid hereunder; and D. fourth,to the Insured in satisfaction of any applicable Deductible paid by the Insured, provided that such recoveries do not include any recovery from insurance, suretyship, reinsurance, security or indemnity taken for the Company’s benefit.

XII. ACQUISITIONS
If,during the Policy Period,the Named Insured acquires or forms an entity that performs Professional Services,coverage will be provided for such acquired or formed entity and its respective Insured Persons for Wrongful Acts committed after the Named Insured acquires or forms such entity.Coverage for such entity will end 90 days after the acquisition or formation of such entity, or the end of the Policy Year,whichever is earlier, unless the Company has agreed to provide such coverage by endorsement.

POLICY NUMBER: 108033405
397

Policy #: 6025396574
398

399

CNA80103XX
(09-14)
THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY.

PRIMARY AND NONCONTRIBUTORY-

OTHER INSURANCE CONDITION
This endorsement modifies insurance provided under the following:

BUSINESSOWNERS COMMON POLICY CONDITIONS
The following is added to Paragraph H.Other Insurance and supersedes any provision to the contrary:

Primary And Noncontributory Insurance
This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that:

1.The additional insured is a Named Insured under such other insurance;and

2.You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured.

All other terms and conditions of the Policy remain unchanged.

CNA80103XX (09-14)

Page 1 of 1 ends

Copyright,CNA All Rights Reserved.Includes copyrighted material of Insurance Services Office,Inc.,with its permission POLICY NUMBER: 6025396574
400

CNA68021XX
(Ed.02/13)

NOTICE OF CANCELLATION TO CERTIFICATEHOLDERS
It is understood and agreed that:

If you have agreed under written contract to provide notice of cancellation to a party to whom the Agent of Record has issued a Certificate of Insurance,and if we cancel a policy term described on that Certificate of Insurance for any reason other than nonpayment of premium,then notice of cancellation will be provided to such Certificateholders at least 30 days in advance of the date cancellation is effective.

If notice is mailed,then proof of mailing to the last known mailing address of the Certificateholder on file with the Agent of Record will be sufficient to prove notice.

Any failure by us to notify such persons or organizations will not extend or invalidate such cancellation,or impose any liability or obligation upon us or the Agent of Record.

CNA68021XX (Ed.02/13)

Page 1 of 1 ends

Copyright,CNA All Rights Reserved.20020008860253965880424POLICY NUMBER: 6025396588 401

SB146968C
(Ed.10-19)
IMPORTANT:THIS ENDORSEMENT CONTAINS DUTIES THAT APPLY TO THE ADDITIONAL INSURED IN THE EVENT OF OCCURRENCE,OFFENSE,CLAIM OR SUIT.SEE PARAGRAPH C.,OF THIS ENDORSEMENT FOR THESE DUTIES.

BLANKET ADDITIONAL INSURED ENDORSEMENT

WITH PRODUCTS-COMPLETED OPERATIONS COVERAGE AND

BLANKET WAIVER OF SUBROGATION
Architects,Engineers and Surveyors
This endorsement modifies insurance provided under the following:

BUSINESSOWNERS LIABILITY COVERAGE FORM

BUSINESSOWNERS COMMON POLICY CONDITIONS
A.Who Is An Insured is amended to include as an insured any person or organization whom you are required to add as an additional insured on this policy under a written contract or written agreement;but the written contract or written agreement must be:

1.Crrently in effect or becoming effective during the term of this policy;and

2.Executed prior to the:
a."Bodily injury"or "property damage";or
b.Offense that caused the "personal and advertising injury"; for which the additional insured seeks coverage
B.The insurance provided to the additional insured is limited as follows:

1.The person or organization is an additional insured only with respect to liability for "bodily injury,""property damage"or "personal and advertising injury"caused in whole or in part by:
a.Your acts or omissions;or
b.The acts or omissions of those acting on your behalf, in the performance of your ongoing operations specified in the written contract or written agreement;or c."Your work"that is specified in the written contract or written agreement,but only for "bodily injury"or "property damage"included in the "products-completed operations hazard,"and only if:
(1)The written contract or written agreement requires you to provide the additional insured such coverage; and
(2)This Coverage Part provides such coverage.

2.The Limits of Insurance applicable to the additional insured are those specified in the written contract or written agreement or in the Declarations of this policy,whichever is less.These Limits of Insurance are inclusive of,and not in addition to,the Limits of Insurance shown in the Declarations.

3.The insurance provided to the additional insured does not apply to "bodily injury,""property damage"or "personal and advertising injury"arising out of an architect's,engineer's,or surveyor's rendering of or failure to render any professional services including:
a.The preparing,approving,or failing to prepare or approve maps,shop drawings,opinions,reports,surveys, field orders,change orders or drawings and specifications by any architect,engineer or surveyor performing services on a project of which you serve as construction manager;or b.Inspection,supervision,quality control,engineering or architectural services done by you on a project of which you serve as construction manager.

4.The insurance provided to the additional insured does not apply to "bodily injury,""property damage"or "personal and advertising injury"arising out of construction or demolition work while you are acting as a construction or demolition contractor.

SB146968C (Ed.10-19)Page 1 of 3
Copyright,CNA All Rights Reserved.40020007460253965749256POLICY #6025396574 402

SB146968C
(Ed.10-19)
C.Under Businessowners Liability Conditions,the condition entitled Duties In The Event of Occurrence,Offense, Claim or Suit is amended to add the following:

An additional insured under this endorsement will as soon as practicable:

1.Give written notice of an occurrence or an offense to us which may result in a claim or "suit"under this insurance;

2.Tender the defense and indemnity of any claim or "suit"to us for a loss we cover under this Coverage Part;

3.Except as provided for in paragraph D.2.below:
a.Tender the defense and indemnity of any claim or "suit"to any other insurer which also has insurance for a loss we cover under this Coverage Part;and
b.Agree to make available any other insurance which the additional insured has for a loss we cover under this Coverage Part.

We have no duty to defend or indemnify an additional insured under this endorsement until we receive written notice of a claim or "suit"from the additional insured.

D.With respect only to the insurance provided by this endorsement,the condition entitled Other Insurance of the BUSINESSOWNERS COMMON POLICY CONDITIONS is amended to delete paragraphs 2.and 3.and replace them with the following:

2.This insurance is excess over any other insurance available to the additional insured,whether primary,excess, contingent or on any other basis,But if required by the written contract or written agreement,this insurance will be primary and noncontributory relative to insurance on which the additional insured is a Named Insured.

3.When this insurance is excess,we will have no duty under Business Liability insurance to defend the additional insured against any "suit"if any other insurer has a duty to defend the additional insured against that "suit"If no other insurer defends,we will undertake to do so,but we will be entitled to the additional insured's rights against all those other insurers.

When this insurance is excess over other insurance,we will pay only our share of the amount of the loss,if any, that exceeds the sum of:
(a)The total amount that all such other insurance would pay for the loss in the absence of this insurance;and (b)The total of all deductible and self-insured amounts under all that other insurance.

We will share the remaining loss,if any,with any other insurance that is not described in this Excess Insurance provision and was not bought specifically to apply in excess of the Limits of Insurance shown in the Declarations of this Coverage Part.

E.Additional Insured –Extended Coverage
When an additional insured is added by this or any other endorsement attached to this Coverage Part,the section entitled Who Is An Insured is amended to make the following natural persons insureds:

If the additional insured is:

1.An individual,then his or her spouse is an insured;

2.A partnership or joint venture,then its partners,members and their spouses are insureds;

3.A limited liability company,then its members and managers are insureds;

4.An organization other than a partnership,joint venture or limited liability company,then its executive officers, directors and shareholders are insureds;or

5.Any type of entity,then its employees are insureds;
but only with respect to locations and operations covered by the additional insured endorsement's provisions,and only with respect to their respective roles within their organizations.Furthermore,employees of additional insureds are not insureds with respect to liability arising out of:
(1)"Bodily injury"or "personal and advertising injury"to any fellow employee or to any natural person listed in paragraphs 1.through 4.above;
SB146968C (Ed.10-19)Page 2 of 3
Copyright,CNA All Rights Reserved.403

SB146968C
(Ed.10-19)
(2)"Property damage"to property owned,occupied or used by their employer or by any fellow employee;or (3)Providing or failing to provide professional health care services.

F.The condition entitled Transfer of Rights of Recovery Against Others to Us of the BUSINESSOWNERS COMMON POLICY CONDITIONS is amended to deleted paragraph 2.and replace it with the following:

2.We waive any right of recovery we may have against any person or organization with whom you have agreed to waive such right of recovery in a written contract or agreement because of payments we make for injury or damage arising out of your ongoing operations or "your work"done under a contract with that person or organization and included within the "products-completed operations hazard." All other terms and conditions of the Policy remain unchanged.

SB146968C (Ed.10-19)Page 3 of 3
Copyright,CNA All Rights Reserved.40020007460253965749257404

CNA80103XX
(09-14)
THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY.

PRIMARY AND NONCONTRIBUTORY-

OTHER INSURANCE CONDITION
This endorsement modifies insurance provided under the following:

BUSINESSOWNERS COMMON POLICY CONDITIONS
The following is added to Paragraph H.Other Insurance and supersedes any provision to the contrary:

Primary And Noncontributory Insurance
This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that:

1.The additional insured is a Named Insured under such other insurance;and

2.You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured.

All other terms and conditions of the Policy remain unchanged.

CNA80103XX (09-14)

Page 1 of 1 ends

Copyright,CNA All Rights Reserved.Includes copyrighted material of Insurance Services Office,Inc.,with its permission Policy #6025396574
405

SB146902G
(Ed.6-16)
THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY.

HIRED AUTO AND NON-OWNED AUTO LIABILITY
This endorsement modifies insurance provided under the following:

BUSINESSOWNERS LIABILITY COVERAGE FORM

BUSINESSOWNERS COMMON POLICY CONDITIONS

SCHEDULE
Insurance is provided only with respect to those coverages for which a specific limit is shown:

COVERAGE LIMIT
Hired Auto Liability:$
Non-owned Auto Liability:$
(If no entry appears above,information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.)

PROVISIONS
A.COVERAGE
With respect only to the Coverage(s)for which a limit is shown in the SCHEDULE above,the insurance provided under Coverage A.1.Business Liability for "bodily injury"and "property damage"also applies to "bodily injury"or "property damage"arising out of the maintenance or use of a:
•"Hired auto"used by you or your "employee"in the course of your business;and/or •"Non-owned auto"used in the course of your business.Maintenance or use of a "non-owned auto"includes test driving in connection with an "auto business."
With respect only to the coverage provided by this endorsement,under Coverages,coverage A.1.Business Liability is amended to:

1.Delete paragraph A.1.b.(1)(b)and replace it with the following:
b.This insurance applies:
(1)To "bodily injury"and "property damage"only if:
(b)The "occurrence"occurs during the policy period;and

2.Delete paragraph A.1.b.(2),.

B.LIMITS OF INSURANCE
With respect only to the coverage provided by this endorsement,SECTION D.Liability And Medical Expenses Limits of Insurance is deleted in its entirety and replaced with the following:

D.Limits Of Insurance

1.Regardless of the number of:
a.Insureds;
b.Claims made or "suits"brought;
c.Persons or organizations making claims or bringing "suits";or d."Autos,"
the applicable Hired Auto Liability limit or Non-Owned Auto Liability limit shown in the Declarations is the most we will pay for damages under SECTION A.Coverages because of all "bodily injury"and "property damage" resulting from any one "occurrence"arising out of the maintenance or use of a "hired auto"or "non-owned auto."
SB146902G (Ed.6-16)

Page 1 ends

Copyright,CNA All Rights Reserved.
1,000,000
1,000,000
Policy Number: 6025396574
406

SB146902G
(Ed.6-16)
C.EXCLUSIONS
With respect only to the insurance provided by this endorsement:

1.Under Exclusions,the paragraph entitled Applicable to Business Liability Coverage is amended to delete all exclusions except exclusions a.,b.,d.,e.,f.and i.and to add the following exclusions:

This insurance does not apply to:
•Fellow Employee
"Bodily injury" to:
(1)Any fellow "employee"of the insured arising out of and in the course of employment by the insured or while performing duties related to the conduct of the insured's business;or (2)The spouse,child,parent,brother or sister of that fellow "employee"while as a consequence of Paragraph (1)above.
•Care,Custody or Control
"Property Damage"to:
(1)Property owned or being transported by,or rented or loaned to the insured;or (2)Property in the care,custody or control of the insured.

D.WHO IS AN INSURED
With respect only to the insurance provided by this endorsement,Who Is An Insured is replaced by the following:

Each of the following is an insured under this insurance to the extent set forth below:

1.You;

2.Subject to paragraph 3.c.below,your "employee"while operating an "auto"hired or rented under a contract or agreement,with your permission,in that "employee's"name,while performing duties related to the conduct of your business.

3.Anyone else including any partner or "executive officer"of yours while using with your permission a "hired auto"or a "non-owned auto"except:
a.The owner or lessee (of whom you are a sublessee)of a "hired auto"or the owner or lessee of a "non-owned auto"or any agent or "employee"of any such owner or lessee; b.Your "employee"if the covered "auto"is owned by that "employee"or a member of his or her household; c.Your "employee"if the covered "auto"is leased,hired or rented by him or her or a member of his or her household under a lease or rental agreement for a period of 180 days or more; d.Any partner or "executive officer" with respect to any "auto"owned by such partner or officer or a member of his or her household;
e.Any partner or "executive officer" with respect to any "auto"leased or rented to such partner or officer or a member of his or her household under a lease or rental agreement for a period of 180 days or more; f.Any person while employed in or otherwise engaged in duties in connection with an "auto business,"other than an "auto business"you operate;
g.Anyone other than your "employees,"partners,a lessee or borrower or any of their "employees,"while moving property to or from a "hired auto"or a "non-owned auto";or

4.Any other person or organization,but only with respect to their liability because of acts or omissions of an insured under 1.,2.or 3.above.

E.AMENDED DEFINITION
The Definition of "insured contract"in Section F –Definitions is amended by the addition of the following exceptions to paragraph f.:

SB146902G (Ed.6-16)

Page 2 ends

Copyright,CNA All Rights Reserved.50020001760212622175215407

SB146902G
(Ed.6-16)
Paragraph f.does not include that part of any contract or agreement:
•That pertains to the loan,lease or rental of an "auto"to you or any of your "employees,"if the "auto"is loaned, leased or rented with a driver;or
•That holds a person or organization engaged in the business of transporting property by "auto"for hire harmless for your use of a covered "auto"over a route or territory that person or organization is authorized to serve by public authority.

F.ADDITIONAL DEFINITIONS
Section F.Definitions is amended by the addition of the following definitions:
a."Auto Business"means the business or occupation of selling,repairing,servicing,storing or parking "autos." b."Hired auto"means any "auto"you or your "employee"lease,hire,rent or borrow in the course of your business.

This does not include:
i.Any "auto"you lease,hire or rent under a lease or rental agreement for a period of 180 days or more,or ii.Any "auto"you lease,hire,rent or borrow from any of your "employees,"partners,stockholders,or members of their households.
c."Non-owned auto"means any "autos"you do not own,lease,hire,rent or borrow that are being used in the course and scope of your business at the time of the "occurrence."This includes "autos"owned by your "employees"or partners or members of their households but only while being used in the course and scope of your business at the time of the "occurrence."
If you are a sole proprietor,"non-owned auto"means any "autos"you do not own,lease,hire,rent or borrow that are being used in the course and scope of your business or personal affairs at the time of the "occurrence." G.With respect only to the operation of a "hired auto"or "non-owned auto,"Paragraph H,of the Businessowners Common Policy Conditions is deleted and replaced with the following:

H.Other Insurance

1.Except for any liability assumed under an "insured contract"the insurance provided by this Coverage Form is excess over any other collectible insurance.

However,if your business is the selling,servicing,repairing,parking or storage of "autos,"the insurance provided by this endorsement is primary when covered "bodily injury"or "property damage"arises out of the operation of a customer's "auto"by you or your "employee."

2.When this Coverage Form and any other Coverage Form or policy covers on the same basis,either excess or primary,we will pay only our share.Our share is the proportion that the Limit of Insurance of our Coverage Form bears to the total of the limits of all the Coverage Forms and policies covering on the same basis.

All other terms and conditions of the Policy remain unchanged.

SB146902G (Ed.6-16)

Page 3 ends

Copyright,CNA All Rights Reserved.408

← All documents from this meeting