Findings of Fact and Statement of Overriding Considerations El Camino Project EIR Findings of Fact 41
Revised September 24, 2025
considerable and significant GHG emissions contribution even after the incorporation of mitigation measures.

In addition to the GHG -specific mitigation measures, the City shall also require the applicant to implement Mitigation Measures AIR-2C, Reduce Light-Duty Vehicle Trip Emissions, AIR-2D/TRA- 1, Prepare VMT/TDM Reduction Plan, and AIR -2E, Reduce Truck Trip Emissions, which would increase the amount of passenger vehicle and truck EV charging infrastructure installed at the Project site and reduce employee trips and associated VMT by approximately 5% (DEIR page

4.8-39).

The EIR recommended the following mitigation measure s in an attempt to reduce these greenhouse gas emission impacts to less than significant levels:

MM-GHG-1: Reduce Appliance Energy Consumption & GHG Emissions. (see Impact GHG- 1 above).

MM-GHG-2: Reduce Building Energy Consumption & GHG Emissions. (see Impact GHG-1 above).

MM-AIR-2C: Reduce Light-duty Vehicle Trip Emissions. (see Impact AIR-1 above).

MM-AIR-2D: Prepare VMT/TDM Reduction Plan (SAME AS TRA-1). (see Impact AIR-1 above).

MM-AIR-2E: Reduce Truck Trip Emissions. (see Impact AIR-1 above).

Finding:

Even with implementation of the recommended mitigation measures, cumulative greenhouse gas emissions of the Project would not be reduced to less than significant levels and a Statement of Overriding Considerations is required. Impacts are significant and unavoidable.

Page 240 ends

Findings of Fact and Statement of Overriding Considerations 42 El Camino Project EIR Findings of Fact
City of Rancho Cucamonga
6 ALTERNATIVES

This section contains a discussion of the alternatives considered and rejected in the El Camino Project DEIR, including the No Project – No Development; Expand Existing Facility (Alternative 1); Reduced Intensity (Alternative 2); and Mixed Use (Commercial/Residential/Office)(Alternative 3). For alternative locations, “only locations that would avoid or substantially lessen any of the significant effects of the project need be considered for inclusion in the EIR” (Section 15126.6(f)(2)(A)). The significant impacts of the proposed Project (NOx and GHG emissions) are based on the type and size of the proposed use so this project on any other site would still result in significant impacts identified in the EIR. In accordance with CEQA Guidelines section 15126.6(a), this EIR does not evaluate every conceivable alternative. A feasible range of alternatives that will allow decision-makers to make a reasoned choice and that meet most of the Project’s guiding principles has been evaluated.

Project Objectives

The Project is intended to implement the goals and policies of the City’s General Plan. The purpose of this Project is to implement the vision laid out in the Project objectives. The Project would generally increase the City’s production capacity and furth er fortify the economic base of the City. It would also revitalize a portion of the City with new and renovated industry and production. The Project is proposed to be developed to accomplish the following objectives:

Objective 1: Facilitate the continued operation of the existing distribution facility with expanded operations and employment capacity.

Objective 2: Redevelop an existing industrial site with modern and sustainable facilities, including large -scale buildings, intricate manufacturing processes, and large employment opportunities.

Objective 3: Develop and operate an attractive state-of-the-art manufacturing and distribution facility in the City that meets industry standards to be competitive with similar facilities in the region.

Objective 4: Maximize the efficiency of the existing operations during the expansion process by providing interim manufacturing steps within the same building envelope.

Objective 5: Develop and operate a production and bottling facility that positively contributes to the local economy through new capital investment and the creation of new employment opportunities, including opportunities for highly-trained workers.

Objective 6: Develop an industrial and manufacturing facility that is in close proximity to Interstate 10, Interstate 15, and other major transportation arterial roadways, to support the production of consumer goods and the distribution of manufactured goods throughout the region.

Objective 7: Implement a microgrid energy production system via cogeneration at an existing manufacturing site to minimize manufacturing waste and to reduce the demand on existing public services and systems while employing carbon -reducing technologies and reduce the f acility’s potential climate impact.

Page 241 ends

Findings of Fact and Statement of Overriding Considerations El Camino Project EIR Findings of Fact 43
Revised September 24, 2025
Selection of Alternatives

To provide a basis for further understanding of the environmental effects of a proposed project and possible approaches to reducing its identified significant impacts, the CEQA Guidelines require an EIR to also “describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project, but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives.” In addition to the No Project-No Development Alternative, which is essentially existing conditions on the site at the time the NOP was issued, the following three alternatives were selected for detailed evaluation in comparison to the proposed Project:

Alternative 1 - Expand Existing Facility. This alternative would almost double the area of the existing beverage distribution facility to 400,000 square feet for new non -residential uses and provide beverage bottling in addition to and in conjunction with the current distribution facility. It would have no residential units and would allow the existing beverage warehouse/distribution building to continue operation. This plan would utilize surface parking and the new building would have a maximum height of approximately 35 -40 feet. The land not nee ded for the new building footprint or parking would be landscaped with walkways for employees and possibly public use if such areas were created along the boundaries of the site (i.e., along adjacent roadways). This alternative would also include use/reuse of the existing warehouse on the Phase 2 property. This alternative includes a new CVWD well but not cogeneration.

Alternative 2 - Reduced Intensity. This alternative would develop about 540,000 square feet of light industrial (non-residential) use, which is approximately 30% less new building area compared to the proposed Project. This plan would have no residential units but require demolition of the existing beverage distribution facility. This plan would eliminate the proposed parking structure and use the remaining non -built area of the site for surface parking. This plan would have landscaping and outdoor use area s for employees consistent with the City General Plan and Development Code requirements. This alternative includes cogeneration and a new CVWD well.

Alternative 3 - Mixed Use (C/R/O). This alternative would develop 675,000 square feet of new office and commercial uses on the first two floors of three new four -story buildings on the site (commercial on ground floor and offices on the 2nd floor). This plan would also have 270 residential units on the top two floors of the three new buildings. The remainder of the site would have covered and uncovered surface parking, landscaping, and employee and tenant and public use areas on the remainder of the site (play equipment, pickleball courts, walkways, dog park, etc.).

The site would be developed according to the General Plan and Development Code requirements for the site with a small internal street east off Haven Avenue visually dividing the property which would be consistent with the development code and general plan block network standards and policies. This alternative is consistent with the existing General Plan land use designation (21st Century Employment District) and the existing zoning classification (ME2). While there are other possible variations of land plans that meet the General Plan and zoning designations, this one was selected as a reasonable alternate land plan for evaluation in the EIR.

Page 242 ends

Findings of Fact and Statement of Overriding Considerations 44 El Camino Project EIR Findings of Fact
City of Rancho Cucamonga
Evaluation of Alternatives

Substantial Evidence:

No Project Alternative

The No Project Alternative represents existing conditions on the site and would have no impacts or less than significant impacts compared to those of the proposed Project due to the fact there would be no new development and only a continuation of uses under this Alternative, and it would result in no significant and unavoidable impacts. It would also not achieve any of the Project Objectives which would involve some type of new development on the site.

Alternative 1: Expand Existing Facility

DEIR Section 5.5 concluded this alternative would have the following less than significant impacts that are equivalent to those of the proposed Project due to the fact the entire site will be disturbed:

Agriculture and Forest Resources; Biological Resources; Cultural Resources; Geology, Soils, and Paleontological Resources; Mineral Resources; and Tribal Cultural Resources.

DEIR Section 5.5 also c oncluded that Alternative 1 would have the following reduced and less than significant impacts relative to those of the proposed Project since it involves less intense development: Aesthetics; Air Quality (health risks, odors) ; Energy; Hazards and Hazardous Materials; Hydrology and Water Quality ; Land Use and Planning ; P opulation, Housing, and Employment; Noise and Vibration ; Public Services; Recreation; Utilities and Service Systems ; Transportation; and Wildfire

Alternative 1 would have the following impacts that are less than those of the proposed Project but are still significant and unavoidable even with implementation of all recommended feasible mitigation measures: Air Quality (AQMP Consistency, project and cumulative NOx emissions) ; and Greenhouse Gas Emissions.

Alternative 2: Reduced Intensity

DEIR Section 5.6 concluded this alternative would have the following less than significant impacts that are equivalent to those of the proposed Project due to the fact the entire site will be disturbed:

Agriculture and Forest Resources; Biological Resources; Cultural Resources; Geology, Soils, and Paleontological Resources; Mineral Resources; and Tribal Cultural Resources.

DEIR Section 5.6 also concluded that Alternative 2 would have the following reduced and less than significant impacts relative to those of the proposed Project since it involves less intense development: Aesthetics; Air Quality (health risks, odors) ; Energy; Hazards and Hazardous Materials; Hydrology and Water Quality ; Land Use and Planning ; P opulation, Housing, and Employment; Noise and Vibration ; Public Services; Recreation; Utilities and Service Systems ; Transportation; and Wildfire

Alternative 2 would have the following impacts that are less than those of the proposed Project but are still significant and unavoidable even with implementation of all recommended feasible mitigation measures: Air Quality (AQMP Consistency, project and cumulative NOx emissions) ; and Greenhouse Gas Emissions.

Page 243 ends

Findings of Fact and Statement of Overriding Considerations El Camino Project EIR Findings of Fact 45
Revised September 24, 2025
Alternative 3: Mixed Use (Commercial/Residential/Office)

DEIR Section 5.7 concluded this alternative would have the following less than significant impacts that are equivalent to those of the proposed Project due to the fact the entire site will be disturbed:

Agriculture and Forest Resources; Biological Resources; Cultural Resources; Geology, Soils, and Paleontological Resources; Mineral Resources; and Tribal Cultural Resources.

DEIR Section 5.7 also concluded that Alternative 3 would have the following reduced and less than significant impacts relative to those of the proposed Project based on the analysis of the mix of land use proposed for this alternative (i.e., commercial, office, and residential): Aesthetics; Air Quality (health risks, odors) ; Energy; Hazards and Hazardous Materials ; Hydrology and Water Quality; Land Use and Planning ; Population, Housing, and Employment ; Public Services ; Recreation; Utilities and Service Systems; Transportation; and Wildfire.

Alternative 3 would have the following impacts that are less than those of the proposed Project but are still significant and unavoidable even with implementation of all recommended feasible mitigation measures: Air Quality (AQMP Consistency, project and cumulative VOC, NOx, CO, PM10, and PM 2.5 emissions); Greenhouse Gas Emissions ; and Noise and Vibration (from increased vehicular traffic)

Meeting Project Objectives

DEIR Section 5.9 indicated the No Project Alternative does not meet the Project Objectives since it involves no development. Alternatives 1 and 2 do not meet the Project Objectives to nearly the same degree as the proposed Project because they do not provide sufficient additional space to adequately manufacture, bottle, and distribute the planned beverages on the scale envisioned by the Project. In addition, Alternative 3 does not meet the Objectives of the Project because it proposes land uses that are consistent with the General Pla n and zoning but do not provide for expanded beverage distribution and new bottling capabilities which is proposed by the Project.

Environmentally Superior Alternative

The No Project Alternative eliminates the significant impacts of the Project, so it is environmentally superior to the Project but it does not achieve any of the Project Objectives. Therefore, one of the development alternatives must be identified as an environmentally superior alternative as well.

Alternative 1 – Expand Existing Facility, reduces potential impacts of the Project to the greatest extent practical although it does not eliminate or reduce either of the significant and unavoidable impacts of the Project (air quality and greenhouse gas em issions) to less than significant levels.

Alternative 2 also reduces impacts of the proposed Project but not nearly to the same degree as Alternative 1 and also does not eliminate either of the significant impacts of the Project. In addition, Alternative 3 would likely result in significant noise impacts due to its substantial increase in vehicular traffic so it would result in three significant and unavoidable impacts compared to the two significant impacts of Alternatives 1 and 2 and the proposed Project.

Alternatives 1 and 2 do not meet the Project Objectives to nearly the same degree as the proposed Project because they do not provide sufficient space to create a unified beverage manufacturing, bottling, and distribution facility as envisioned by the proposed Project. Alternative 3 does not meet the Objectives of the Project because it proposes a mix of land uses that do not include a larger beverage bottling and distribution facility as included in the proposed Project.

Page 244 ends

Findings of Fact and Statement of Overriding Considerations 46 El Camino Project EIR Findings of Fact
City of Rancho Cucamonga
For these reasons, The EIR determined that Alternative 1 – Expand Existing Facility, is the Environmentally Superior Alternative to the proposed Project.

Findings:

DEIR Section 5.10 found Alternative 1 to be environmentally superior to the Project although it did not eliminate or reduce either of the significant impacts of the Project (NOx and greenhouse gas emissions) to less than significant levels. In addition, Alternative 1 does not meet the Project Objectives to nearly the same degree as the proposed Project because it does not provide sufficient additional space to adequately manufacture, bottle, and distribute the planned beverages on the scale envisioned by the Project or needed for the existing facility to operate at peak efficiency. For these reasons, the City determines that Alternative 1 is less desirable than the proposed Project and therefore rejects the alternative per Public Resources Code § 21081(a)(3); CEQA Guidelines, §15091(a)(3).

Page 245 ends

Findings of Fact and Statement of Overriding Considerations El Camino Project EIR Findings of Fact 47
Revised September 24, 2025
7 STATEMENT OF OVERRIDING CONSIDERATIONS

CEQA requires that a Lead Agency balance the benefits of a project against its adverse and unavoidable effects in determining whether to approve the project. If the benefits outweigh the unavoidable adverse effects, those effects may be considered “acceptable” pursuant to State CEQA Guidelines Section 15093(a). CEQA requires that a Lead Agency support, in writing, the specific reasons for considering a project acceptable when significant impacts are infeasible to mitigate. Those reasons must be based on sub stantial evidence in the Environmental Impact Report (EIR) or elsewhere in the administrative record pursuant to State CEQA Guidelines Section 15093(b). The Lead Agency’s written reasons are referred to as a Statement of Overriding Considerations. For those significant impacts that cannot be mitigated to below a level of significance, the Lead Agency is required to find that the specific overriding economic, legal, social, technological, or other benefits of the project outweigh the significant impacts on t he environment.

Regarding a Statement of Overriding Considerations, Section 15093 of the CEQA Guidelines provides the following:

1. CEQA requires the decision -making agency to balance, as applicable, the economic, legal, social, technological, or other benefits including region -wide or statewide environmental benefits of a proposed project against its unavoidable environmental risks when determining whether to approve the project. If the specific economic, legal, social, technological, or other benefits including region-wide or statewide environmental benefits or other benefits of a proposed project outweigh the unavoidable adverse environmental effects, the adverse environmental effects may be considered "acceptable."

2. When the lead agency approves a project that will result in the occurrence of significant effects which are identified in the Final EIR but are not avoided or substantially lessened, the agency shall state in writing the specific reasons to support its action based on the Final EIR and/or other information in the record. The statement of overriding considerations shall be supported by substantial evidence in the record.

3. If an agency makes a statement of overriding considerations, the statement should be included in the record of the project approval and should be mentioned in the Notice of Determination. This statement does not substitute for, and shall be in addition to, findings required pursuant to Section 15091.

The City will approve the El Camino Project and has prepared a Final EIR that satisfies the requirements of CEQA. The following adverse impacts of the project are considered significant and unavoidable based on the analysis in the Draft EIR (DEIR), Final EIR (FEIR), and the Findings of Fact.
• Impact AIR-1: Conflict with or Obstruct Implementation of Applicable Air Quality Plans because it would exceed the growth assumption of the 20 22 South Coast Air Quality Management Plan (AQMP), and Nitrogen Oxides (NOx) emissions would exceed SCAQMD’s regional threshold, thereby impeding AQMP attainment. (Regional operational and combined phase 1 operational and Phase 2B regional construction).

• Impact AIR-2: Result in a cumulatively considerable net increase of non-attainment criteria pollutants for which the project region is in non -attainment (including NOx). (Regional operational and combined Phase 1 operational and Phase 2B regional construction).

Page 246 ends

Findings of Fact and Statement of Overriding Considerations 48 El Camino Project EIR Findings of Fact
City of Rancho Cucamonga

• Impact AIR-5: Cause adverse substantial adverse cumulative impacts with respect to air quality (Cumulative Impact from NOx operational emissions).

• Impact GHG-1: Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment.

• Impact GHG -3: Cause a substantial adverse cumulative impact with respect to greenhouse gas emissions (Cumulative Impact).

The City has determined that the unavoidable adverse environmental impacts identified above are acceptable because those impacts are outweighed by the economic, social, technological, and other benefits of the Project, listed below.

• The project will maintain the City’s economic viability and productivity over the long term by encouraging efficient and sustainable use of the overall site, a portion of which at present is vacant.

• The project increases an employment generating use thereby increasing employment opportunities within Rancho Cucamonga.

• The project provides for expanded and comprehensive siting of an important employer and business to help sustain a strong local economy, with design qualities that contribute to its success.

• The project will expand a n industrial and manufacturing facility with ready access to Interstate 10, Interstate 15, and other major transportation arterial roadways, to support the production of consumer goods and the distribution of manufactured goods throughout the region.

• The project provides for the development and maintenance of a citywide bicycle network of off -street bike paths, off-street sidewalks, and on-street bike lanes, including along Haven Avenue, 6th Street, 7th Street, and Utica Avenue.

• The project proportionally supports a connected, balanced, integrated, safe, and multi - modal transportation system that accommodates all travel options.

• The project promotes the use of transit within the City as a means of reducing local traffic congestion, achieving greenhouse gases reduction targets, and connecting the community physically and socially.

• The project includes e nergy efficiency and conservation systems and measures that reduce air pollution and greenhouse gas emissions.

• The project will Implement a microgrid energy production system via cogeneration at an existing manufacturing site to minimize manufacturing waste and to reduce the demand on existing public services and systems while employing carbon -reducing technologies and reduce the facility’s potential climate impacts.

Page 247 ends

Findings of Fact and Statement of Overriding Considerations El Camino Project EIR Findings of Fact 49
Revised September 24, 2025
• The project will increase the potential for beverage manufacturing as a revenue- generating land use for the City.

The City Council hereby finds that the foregoing benefits provided to the public through the approval of the project outweigh the identified significant adverse environmental impacts of the project that cannot be mitigated. The City Council finds that each of the Project benefits separately and individually outweighs all of the unavoidable adverse environmental effects identified in the EIR and therefore finds those impacts to be acceptable. The City Council further finds that no feasible alternative exists that both would provide all of the foregoing benefits to the public and reduce environmental impacts when compared to the Project.

Page 248 ends

Findings of Fact and Statement of Overriding Considerations 50 El Camino Project EIR Findings of Fact
City of Rancho Cucamonga

This Page Intentionally Left Blank

Page 249 ends

Conditions of Approval
Community Development Department
Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Planning Department
Please be advised of the following Special Conditions
As a condition of approval, the structure is to be marked /lighted in accordance with FAA Advisory circular 70/7460-1 M, Obstruction Marking and Lighting, red lights-Chapters 4,5(Red),&15.

Any failure or malfunction that lasts more than thirty (30) minutes and affects a top light or flashing obstruction light, regardless of its position, should be reported immediately to (877) 487-6867 so a Notice to Air Missions (NOTAM) can be issued. As soon as the normal operation is restored, notify the same number.

1. The project shall comply with all site -specific development standards established through the subject master plan application in addition to all relevant development standards. To the extent any standard conditions of approval conflict with the site -specific development standards established by the master plan, then those site -specific development standards take precedent over standard conditions of approval. Any future deviations from site -specific master plan or development standards may result in additional entitlements or modifications to project entitlements.

2. Standard Conditions of Approval
For commercial and industrial projects, paint roll -up doors and service doors to match main building colors.

3. All roof appurtenances, including air conditioners and other roof mounted equipment and /or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans.

4. The applicant shall sign the Statement of Agreement and Acceptance of Conditions of Approval provided by the Planning Department. The signed Statement of Agreement and Acceptance of Conditions of Approval shall be returned to the Planning Department prior to the submittal of grading/construction plans for plan check, request for a business license, and/or commencement of the approved activity.

5. www.CityofRC.us
Printed: 10/27/2025

Page 250 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Planning Department
Standard Conditions of Approval
The applicant shall indemnify, protect, defend, and hold harmless, the City, and/or any of its officials , officers, employees, agents, departments, agencies, those City agents serving as independent contractors in the role of City officials and instrumentalities thereof (collectively “Indemnitees” ), from any and all claims, demands, lawsuits, writs of mandamus, and other actions and proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature ), and alternative dispute resolutions procedures (including, but not limited to, arbitrations, mediations, and other such procedures ) (collectively “Actions” ), brought against the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, the action of, or any permit or approval issued by, the City and /or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City ), for or concerning the project, whether such actions are brought under the California Environmental Quality Act (CEQA), State Planning and Zoning Law, the Subdivisions Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local statute, law, ordinance, rule, regulation, or any decision of a competent jurisdiction. This indemnification provision expressly includes losses, judgments, costs, and expenses (including, without limitation, attorneys’ fees or court costs) in any manner arising out of or incident to this approval, the Planning Director’s actions, the Planning Commission’s actions, and/or the City Council’s actions , related entitlements, or the City’s environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit , action, or other legal proceeding. It is expressly agreed that the City shall have the right to approve , which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that the applicant shall reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the applicant of any Action brought and City shall cooperate with applicant in the defense of the Action. In the event such a legal action is filed challenging the City’s determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due.

6. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Determination & Environmental Impact Report fee in the amount consistent with current fees at the time of project approval. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing.

7. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 2 years from the date of approval or a time extension has been granted.

8. www.CityofRC.us Page 2 of 19Printed: 10/27/2025

Page 251 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Planning Department
Standard Conditions of Approval
Any modification or intensification of the approved use, including revisions in the operations of the business including changes to the operating days /hours; change in the location on -site or within the building of the use /activity that is approved by this Conditional Use Permit; improvements including new building construction; and/or other modifications /intensification beyond what is specifically approved by this Conditional Use Permit, shall require the review and approval by the Planning Director prior to submittal of documents for plan check /occupancy, construction, commencement of the activity, and/or issuance of a business license. The Planning Director may determine that modifications or intensifications of use require the submittal of an application to modify this Conditional Use Permit for review by the City.

9. This project is subject to public art requirement outlined in Chapter 17.124 of the Development Code .

Prior to the issuance of building permits (for grading or construction ), the applicant shall inform the Planning Department of their choice to install public art, donate art or select the in -lieu option as outlined in 17.124.020.D.

If the project developer chooses to pay the in -lieu fee, the in -lieu art fee will be invoiced on the building permit by the City and shall be paid by the applicant prior to building permit issuance.

If the project developer chooses to install art, they shall submit, during the plan check process, an application for the art work that will be installed on the project site that contains information applicable to the art work in addition to any other information as may be required by the City to adequately evaluate the proposed the art work in accordance with the requirements of Chapter 17.124.

If the project developer chooses to donate art, applications for art work donated to the City shall be subject to review by the Public Art Committee which shall make a recommendation whether the proposed donation is consistent with Chapter 17.124 and final acceptance by the City Council.

If the developer chooses the installation of art option, or chooses a combination of the art installation and in lieu fee payment option, any public art costs not expended which are equal to the art value must be paid as part of an in lieu fee prior to certificate of occupancy.

No final approval, such as a final inspection or the a issuance of a Certificate of Occupancy, for any development project (or if a multi -phased project, the final phase of a development project) that is subject to this requirement shall occur unless the public art requirement has been fulfilled to the satisfaction of the Planning Department.

10. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Development Code Section 17.80.050, and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist 's recommendations regarding preservation, transplanting, and trimming methods.

11. www.CityofRC.us Page 3 of 19Printed: 10/27/2025

Page 252 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Planning Department
Standard Conditions of Approval
A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services.

12. Landscaping and irrigation systems required to be installed within the public right -of-way on the perimeter of this project area shall be continuously maintained by the developer.

13. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls.14.

The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department.

15. Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of Building Permits. These criteria shall encourage the natural growth characteristics of the selected tree species.

16. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building.

17. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department.

18. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82.

19. Multiple car garage driveways shall be tapered down to a standard two-car width at street.20.

All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop).

21. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of Building Permits.

22. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards.

23. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and master plan and shall require separate application and approval by the Planning Department prior to installation of any signs.

24. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and /or Master Plans in effect at the time of Building Permit issuance.

25. www.CityofRC.us Page 4 of 19Printed: 10/27/2025

Page 253 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Planning Department
Standard Conditions of Approval
All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards.

26. The developer shall submit a construction access plan and schedule for the development of all lots for Planning Director and Engineering Services Department approval; including, but not limited to, public notice requirements, special street posting, phone listing for community concerns, hours of construction activity, dust control measures, and security fencing.

27. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations , the General Plan, the project Environmental Impact Report, associated CEQA findings and the corresponding Mitigation Monitoring and Reporting Program.

28. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and /or proposed shall be installed at locations that are not within direct view or line -of-sight of the main entrance. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services /Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be screened behind a 4-foot high block wall. These walls shall be constructed of similar material used on-site to match the building.

29. Downspouts shall not be visible from the exterior of any elevations of the buildings. All downspouts shall be routed through the interior of the building walls.

30. All ground -mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls and/or landscaping to the satisfaction of the Planning Director.

31. All parkways, open areas, and landscaping shall be permanently maintained by the property owner , homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and Engineering Services Department review and approved prior to the issuance of Building Permits.

32. A detailed on -site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (909-477-2800) prior to the issuance of Building Permits .

Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties.

33. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy.

34. www.CityofRC.us Page 5 of 19Printed: 10/27/2025

Page 254 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Planning Department
Standard Conditions of Approval
All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first.

35. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Director.

36. Revised Site Plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of Building Permits.

37. Trash receptacle (s)/enclosure(s) are required and shall meet relevant standards. The applicant shall provide the City approval from the local refuse service provider, Burrtec, of trash /refuse plan, including number and location of trash enclosures, prior to the issuance of building permits.

38. Engineering Services Department
Please be advised of the following Special Conditions
Prior to the release of encroachment permit of the project, the property owner must enter into an agreement with the City of Rancho Cucamonga to establish ongoing maintenance responsibilities for the proposed private drainage within the public storm drain easement along Haven Ave. This agreement shall outline the scope of maintenance, inspection schedules, and any necessary corrective actions to be undertaken. A copy of the executed agreement shall be provided to the relevant authorities for record -keeping purposes. The maintenance obligation shall remain in effect for the life of the drainage device and shall be transferred to any subsequent property owners as applicable.

1. 6th Street Improvements:

All proposed street improvements along 6th Street within the City of Rancho Cucamonga shall be designed and constructed in conformance with the standards, specifications, and design intent established by the recent 6th Street Capital Improvement Project. The applicant shall coordinate with the City’s Engineering Department to ensure consistency with the approved plans, including but not limited to roadway alignment, streetscape elements, pedestrian infrastructure, and utility placements.

Furthermore, the applicant shall acknowledge and comply with the existing moratorium on construction activities along 6th Street. No work shall commence within the affected corridor until the moratorium is lifted or written authorization is provided by the City. Any proposed exceptions must be reviewed and approved by the City Engineer as per section 12.03.040 of the Municipal Code.

2. www.CityofRC.us Page 6 of 19Printed: 10/27/2025

Page 255 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Please be advised of the following Special Conditions
Phased Pad Elevation and Foundation Construction:

The applicant shall be permitted to construct pad elevations and building foundations in phases , consistent with the approved building phasing plan for the project. Each phase of pad grading and foundation installation shall be subject to review and approval by the City’s Building and Safety Division and Engineering Department prior to commencement.

All phased work must demonstrate compliance with the overall site grading plan, drainage requirements, and geotechnical recommendations to ensure proper integration with adjacent phases .

The applicant shall provide updated grading and foundation plans for each phase, including verification of pad elevation benchmarks, prior to issuance of building permits for that phase.

No deviation from the approved phasing sequence shall be allowed without prior written authorization from the City.

3. CFD District: The developer shall enter into an Annexation Proceeding and sign a Consent and Waiver to join Community Facilities District CFD 2022-01 and CFD 2022-02 (Street Lighting Services) and shall be filed by Special Districts prior to final map approval or issuance of Building Permits whichever occurs first. Any annexation cost shall be borne by the developer. For any questions and /or processing coordination of the CFD please contact Kelly Guerra at (909) 774-2582 or by email at [email protected].

4. Applicant shall pay all applicable Development Impact Fees prior to the issuance of the Building Permit.5.

Parcel Map
The project 's Vesting Tentative Parcel Map shall meet the Subdivision Map Act, City Development Codes, and Conditions of Approval requirements. The Final Map shall be approved and recorded with the San Bernardino County Recorders Office prior to issuance of occupancy.

6. The applicant shall submit the following improvement plans to the Engineering Department for review .

Each plan set shall be submitted as a separate package:

Street Improvement Plans
Storm Drain Plans
Signing and Striping Plans
Streetlight Plans
Fiber Optic Plans
Grading Plans
On-site Sewer and Water Plans
Parcel Map
Off-site Landscaping Plans

7. The developer shall submit revised plans to the City for review and approval prior to permit issuance , reflecting the removal of the Haven Avenue frontage lane as shown on the entitlement set. The revised plans shall conform to all applicable City of Rancho Cucamonga standards and shall be prepared to the satisfaction of the City Engineer. The developer shall coordinate with Omnitrans to ensure that the revised frontage design does not conflict with existing or planned transit operations or facilities.

8. www.CityofRC.us Page 7 of 19Printed: 10/27/2025

Page 256 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Please be advised of the following Special Conditions
The developer shall coordinate with both the City of Rancho Cucamonga and Omnitrans regarding the design and construction of the proposed bus stop along Haven Avenue. The bus stop shall be constructed in accordance with all applicable City standards and shall be consistent with Omnitrans’ operational requirements and plans for this transit route. Final design and location shall be subject to the review and approval of the City Engineer and Omnitrans.

9. Standard Conditions of Approval
A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of Building Permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer.

10. Public storm drain easements shall be graded to convey overflows in the event of a blockage in a sump catch basin on the public street, and provisions made to pass through walls.

11. Adequate provisions shall be made for acceptance and disposal of historical surface drainage entering the property from adjacent areas.

12. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk.

13. ** CD Information Required Prior to Sign-Off for Building Permit Prior to the issuance of building permits, if valuation is greater or equal to $100,000, a Diversion Deposit and a related administrative fee shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 65% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Applicant must identify if they are self -hauling or utilizing Burrtec prior to issuance of a building permit. Proof of diversion must be submitted to the Environmental Engineering Division within 60 days following the completion of the construction and / or demolition project.

Contact Marissa Ostos, Environmental Engineering, at (909) 774-4062 for more information.

Instructions and forms are available at the City 's website, www.cityofrc.us, under City Hall / Engineering / Environmental Programs / Construction & Demolition Diversion Program.

14. Permits shall be obtained from the following agencies for work within their right of way:
- CVWD
- City of Rancho Cucamonga

15. Prior to finalization of any development phase, sufficient improvement plans shall be completed beyond the phase boundaries to assure secondary access and drainage protection to the satisfaction of the City Engineer. Phase boundaries shall correspond to lot lines shown on the approved tentative map.

16. If the required public improvements are not completed prior to approval of the final parcel map, an improvement agreement shall be placed upon the final parcel map, stating that they will be completed upon development for: Haven Avenue, 6th Street, Utica Avenue, and 7th Street.

17. www.CityofRC.us Page 8 of 19Printed: 10/27/2025

Page 257 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
If the required public improvements are not completed prior to approval of the final parcel map, an improvement security accompanied by an agreement executed by the Developer and the City will be required for: Haven Avenue, 6th Street, Utica Avenue, and 7th Street.

18. Add the following note to any private landscape plans that show street trees: “All improvements within the public right -of-way, including street trees, shall be installed per the public improvement plans .” If there is a discrepancy between the public and private plans, the street improvement plans will govern.

19. “Developer shall install a dark fiber conduit package fronting the development. Two 4” Schedule 40 PVC conduits, along with three 1 ¼” innerducts in one of the 4” conduits, per City Standard 145. The size, placement, and location of the conduit shall be shown on the Street Improvement Plans and subject to Engineering Services Department review and approval prior to issuance of Building Permits or final map approval, whichever comes first.”

20. www.CityofRC.us Page 9 of 19Printed: 10/27/2025

Page 258 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
Construct the following perimeter street improvements including, but not limited to:

HAVEN AVENUE:
- Curb & Gutter
- A.C. Pavement
- Sidewalk
- Bus Stop
- Drive Appr.
- Streetlights Relocation
- Street Trees
- Class 4 Bike Path; Including Transition to existing, past property lines - Signing & Striping
- Storm Drain
- Fiber Optic Conduit
- Utilities
- Sewer & Water
- Other
6TH STREET:
- Curb & Gutter
- 2'' Grind and overlay for the following:
- Westbound Lanes: Curb to Median
- Eastbound Lanes: Median to Next Lane Line
- Sidewalk
- Drive Appr.
- Street Trees
- Reconstruction of Median Island
- Bike Path; Re-striping
- Storm Drain
- Fiber Optic Conduit
- Utilities
- Sewer & Water
- Other
UTICA AVENUE:
- Curb & Gutter
- A.C. Pavement
- Sidewalk
- Drive Appr.
- Street Trees

21. www.CityofRC.us Page 10 of 19Printed: 10/27/2025

Page 259 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
- Signing & Striping
- Storm Drain, if applicable
- Fiber Optic Conduit
- Utilities, if applicable
- Sewer & Water, if applicable
- Other
7TH STREET:
- Curb & Gutter
- A.C. Pavement
- Sidewalk
- Drive Appr.
- Streetlight
- Street Trees
- Signing and Striping
- Storm Drain, if applicable
- Fiber Optic Conduit
- Utilities, if applicable
- Sewer & Water, if applicable
- Other
ADA RAMPS AT THE CORNER OF:
- Haven Avenue and 6th Street
- Utica Avenue and 6th Street
- Utica Ave and 7th Street
Notes: ( a) Median island includes landscaping and irrigation on meter. ( b) Pavement reconstruction and overlays will be determined during plan check. ( c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item.

Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, storm drains, and Signing and Striping shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and /or private street improvements, prior to final map approval or the issuance of Building Permits, whichever occurs first. b. Prior to any work being performed in public right -of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. c. Pavement striping, marking, and traffic signing shall be installed to the satisfaction of the City Engineer.

22. www.CityofRC.us Page 11 of 19Printed: 10/27/2025

Page 260 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
Install fiber optic conduit, vaults, and manholes per Standard Drawings 135-137. Public improvement plans shall show the location and limits of the conduits, vaults and manholes with construction notes.

23. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: “Street trees shall be installed per the notes and legend on Sheet ___ (typically Sheet 1).” Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans.

Street Name
Botanical Name
Common Name
Min. Grow Space
Spacing
Size
Qty.

Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Services Department.

Street trees are to be planted per public improvement plans only.

24. All public improvements on the following streets shall be operationally complete prior to certificate of occupancy:

Haven Ave
Utica Ave
6th St
7th St

25. All public improvements ( drainage facilities, landscaped areas, etc.) shown on the plans and /or tentative map shall be constructed to City Standards.

26. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program.

27. The developer shall be responsible for the relocation of existing utilities as necessary.28.

Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required.

29. www.CityofRC.us Page 12 of 19Printed: 10/27/2025

Page 261 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them.

30. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects.

31. Easements for public sidewalks placed outside the public right -of-way shall be dedicated to the City along:

Haven Avenue
6th Street
Utica Avenue
7th Street

32. Corner property line cutoffs shall be dedicated per City Standards, at the corners of:

Haven Ave and 6th St
Utica Ave and 6th St
Utica Ave and 7th St

33. The subdivider shall provide a private access easement over Parcel 2, as shown on the tentative map , to ensure legal and physical access for the benefit of adjacent parcels. The easement shall be recorded on the Parcel Map, subject to review and approval by the City Engineer.

34. www.CityofRC.us Page 13 of 19Printed: 10/27/2025

Page 262 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
The applicant shall revise the Traffic Impact Analysis (TIA) to include critical volume -to-capacity (V/C) ratios for all study intersections and driveways, in accordance with the City of Rancho Cucamonga’s TIA Guidelines. Per confirmation with City staff, this requirement applies to all study intersections, not just project driveways. This includes all intersections /driveways located along 6th Street and along Haven Avenue. The applicant shall continue coordination with the City and Transtech to complete the LOS analysis as part of the ongoing traffic study.

The project shall also comply with all recommendations provided in the June 13, 2025, letter from California Department of Transportation which is included as part of the project’s environmental documentation. Specifically, the applicant shall provide a Safety Analysis Report for the I -10/Haven Ave interchange and I -15/4th St interchange. The Safety Analysis Report shall follow the attached guidance .

Local Development Review (LDR) Safety Review Practitioner Guidance in February 2024. To request crash data on the State Highway System, please submit your request via our California Public Records Act (CPRA) portal following the link (Support Home Page (mycusthelp.com)). Please analyze the existing crash data and discuss the project’s impact on safety as needed. -Perform safety analysis using HSM (Supplement 2014) Chapter 19 for the proposed project in the following conditions:
-Existing condition.
-Opening year: with and without project.
-Horizon year: with and without project.

Please provide appropriate countermeasures to reduce project’s safety impact if applicable.

If any Caltrans facilities are impacted by the project, they must comply with the American Disabilities Act (ADA) Standards upon project completion. Additionally, the project must ensure the maintenance of bicycle and pedestrian access throughout the construction phase. These access considerations align with Caltrans’ equity mission to provide a safe, sustainable, and equitable transportation network for all users.

Please be advised that any permanent work or temporary traffic control that encroaches onto Caltrans’ Right-of-Way (R/W) requires a Caltrans -issued encroachment permit. For information regarding the Encroachment Permit application and submittal requirements, contact: Caltrans Office of Encroachment Permits, 464 West 4th Street, Basement, MS 619, San Bernardino, CA 92401-1400, (909) 383-4526, [email protected], https://dot.ca.gov/programs/traffic-operations/ep Important Note: All permit applications must now be submitted through our CEPS Online Portal at :
https://ceps.dot.ca.gov/

35. www.CityofRC.us Page 14 of 19Printed: 10/27/2025

Page 263 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Engineering Services Department
Standard Conditions of Approval
Dedication shall be made of the following rights -of-way on the perimeter streets (measured from street centerline):
- 33 total feet on 7th Street

36. Fire Prevention / New Construction Unit
Standard Conditions of Approval
The parcels are required to be annexed into Community Facilities District 85-1 (CFD 85-1) if they have not yet been annexed into the CFD. Please contact Kelly Guerra with the City of Rancho Cucamonga’s Special Districts Division at (909) 774-2582 or Kelly [email protected] to inquire about the annexation status and complete the annexation if needed. The annexation requirement will not be considered complete until the applicant provides proof of annexation or begins the annexation process and Special Districts notifies the Fire Marshal that the process has been started.

1. Emergency responder communication coverage in accordance with Fire District Standard 5-12 is required for the building (s) included in this project. A radio signal strength test of the public safety radio communication system conducted in accordance with the requirements of the 2022 California Fire Code is required to be submitted. Where existing radio signal strength does not meet the requirements of the Fire Code, a separate submittal for an emergency responder communication coverage system is required.

2. High-piled combustible storage is required to be in accordance with Chapter 32 of the Fire Code and Fire District Standard 32-1. Please read and understand this Standard in its entirety to avoid delays in scheduling inspections and obtaining approvals. The Standard has been uploaded to the Documents section.

3. A Knox Box key box is required in accordance with Fire District Standard 5-9. Additional boxes may be required depending on the size of the building, the location of fire protection and life safety system controls, and the operational needs of the Fire District. The Standard has been uploaded to the Documents section. If an installed Knox Box is available to this project or business, keys for the building/suite/unit are required to be provided to the Fire Inspector at the final inspection.

4. A Knox key switch is required to be installed on motorized gates that are installed across or provide access to a fire access road (fire Lane). See Fire District Standard 5-3 for Residential Gates and Fire District Standard 5-4 for Commercial and Industrial Gates.

5. A Knox or Fire District padlock is required to be incorporated into the security system for a manually operated gate that is installed across or provides access to a fire access road (fire lane).

6. Gates installed across a commercial /industrial emergency vehicle access road (fire lane) are required to be in accordance with Standard 5-4. The Standard has been uploaded to the Documents section.

7. Release of construction permits issued by the City of Rancho Cucamonga or the County of San Bernardino will be in accordance with Fire District Standard 33-1. The Standard has been uploaded to the Documents section.

8. www.CityofRC.us Page 15 of 19Printed: 10/27/2025

Page 264 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Fire Prevention / New Construction Unit
Standard Conditions of Approval
Due to the type of construction, construction materials, the floor area of the project, and known risks associated with projects of this nature, a Fire Protection and Site Safety plan is required to be implemented when combustible construction materials are delivered to the site, with the exception of foundation form materials. The Fire Prevention and Site Safety plan is required to be in compliance with Fire District Standard 33-3. The Standard has been uploaded to the Documents section. Review and approval of the fire prevention and site safety plan is a condition of construction permit approval. The fire prevention and site safety plan is required to be approved by the Fire District prior to construction permits being approved and issued.

9. Roof access is required to be in accordance with Fire District Standard 5-6. The Standard has been uploaded to the Documents section.

10. Temporary fire apparatus access (fire lanes) and temporary fire hydrants, if needed, are required to be in accordance with Fire District Standard 33-2. The Standard has been uploaded to the Documents section.

11. Public and private fire service water mains, public and private hydrants, water control valves, fire sprinkler risers, fire department connections (FDCs), and other fire protection water related devices and equipment are required to be provided, designed, and installed in accordance with Fire District Standard 5-10. The Standard has been uploaded to the Documents section.

12. Grading Section
Standard Conditions of Approval
Prior to the issuance of a grading permit a final project -specific Water Quality Management Plan shall be submitted for review and approval by the Engineering Department.

1. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga’s “Memorandum of Agreement of Storm Water Quality Management Plan” shall be submitted for review and approval by the Building Official and recorded with the County Recorder’s Office.

2. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID).

3. A Grading Bond will be required to be submitted to the Building and Safety Services Department Official for review and approval prior to issuance of a Grading Permit.

4. The land owner shall provide an inspection report by a qualified person /company on a biennial basis for the underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP”s) as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner.

5. Prior to issuance of a wall permit, on engineered combination garden /retaining walls along the property boundary the structural calculations for the wall shall assume a level toe /heel at the adjacent off -site property (i.e. a manufactured slope is not present).

6. www.CityofRC.us Page 16 of 19Printed: 10/27/2025

Page 265 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Grading Section
Standard Conditions of Approval
Prior to issuance of a wall permit, a copy of the Grading Special Conditions of Approval shall be included within the engineered wall plans and calculations.

7. The site shall be rough graded to eliminate all cross -lot drainage, (except in approved facilities adjacent to private trails). All slopes and retaining walls necessary to accomplish this shall be installed prior to final map approval.

8. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent

9. Metropolitan Water District (MWD) shall approve all plans that impact their easement, including utilities , storm drain, slopes, and street trees and landscaping prior to issuance of a grading permit. A note shall be included on all pertinent plans requiring Metropolitan Water District Operations Maintenance Branch to be notified two working days prior to starting any work in the vicinity of their easement.

10. A permit shall be obtained from Metropolitan Water District (MWD) for any work within their right -of-way, including grading prior to issuance of a grading permit.

11. If more than 5,000 square feet of combined asphalt concrete and PCC parking and driveway surface area are removed and replaced, a Priority Water Quality Management Plan (WQMP) will be required for this project. Contact the Engineering Department for additional direction/information.

12. Prior to the issuance of a grading permit the applicant shall provide to Engineering Services Director a copy of the City of Rancho Cucamonga’s Memorandum of Agreement for Storm Water Quality Management Plan for review prior to recordation of the document. The Memorandum of Agreement for Storm Water Quality Management Plan shall be recorded prior to issuance of a grading permit.

13. A Storm Water Quality Management Plan (WQMP) shall be approved by the Engineering Official and the City of Rancho Cucamonga’s “Memorandum of Storm Water Quality Management Plan” shall be recorded prior to the issuance of a grading permit.

14. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report.

15. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Engineering Official prior to the issuance of building permits.

16. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer.

17. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit.

18. If a Rough Grading and Drainage Plan /Permit are submitted to the Engineering Official for review, that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit.

19. www.CityofRC.us Page 17 of 19Printed: 10/27/2025

Page 266 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Grading Section
Standard Conditions of Approval
A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Engineering Official for review and approval for on -site storm water drainage prior to issuance of a grading permit. All reports shall be wet signed and sealed by the Engineer of Record.

20. The Final Grading and Drainage Plan shall show the accessibility path from the public right of way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code. All accessibility ramps shall show sufficient detail including gradients, elevations, and dimensions and comply with the current adopted California Building Code.

21. The Grading and Drainage Plan shall implement City Standards for on -site construction where possible , and provide details for all work not covered by City Standard Drawings.

22. All slopes shall be a minimum 2-foot offset from the public right of way or adjacent private property.23.

Private sewer, water, and storm drain improvements will be designed per the, latest adopted California Plumbing Code.

24. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code.

25. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary.

26. The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Engineering Department.

27. This project shall comply with the accessibility requirements of the current adopted California Building Code.

28. The precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout “Information for Grading Plans and Permit”.

29. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre -grading meeting. The meeting shall be attended by the project owner /representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre -grading meeting is not held within 24 hours from the start of grading operations , the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over -excavation; ii) Completion of Rough Grading, prior to issuance of the building permit ; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit.

30. www.CityofRC.us Page 18 of 19Printed: 10/27/2025

Page 267 ends

Project #: DRC2023-00067 DRC2023-00068, DRC2023-00069, DRC2023-00070, DRC2023-00072, DRC2024-00163, SUBTPM20713
Project Name: El Camino
Location: 10670 6TH ST - 020941134-0000
Project Type: Design Review Conditional Use Permit, Development Agreement, Master Plan, Tentative Parcel Map, Tree Removal Permit, Uniform Sign Program
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:

Grading Section
Standard Conditions of Approval
Prior to the issuance of the Certificate of Occupancy the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) best management practices (BMP) devices.

31. The Water Quality Management Plan (WQMP) shall include a copy of the project Conditions of Approval.

32. www.CityofRC.us Page 19 of 19Printed: 10/27/2025

Page 268 ends

SMRH:4934-3330-9552.4 A
Green Jobs & Clean
Communities
P.O. Box 79222
Corona, CA 92877
October 29, 2025

BY EMAIL
Rancho Cucamonga City Council
City of Rancho Cucamonga
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Attention: Mr. Sean McPherson,
Principal Planner
Email: [email protected]
Re: Withdrawal of Comment Letter re Lone Oak Rancho Project ( F i l e N o . D R C 2 0 2 3 - 0 0 0 6 7 , D R C 2 0 2 3 - 0 0 0 6 8 , D R C 2 0 2 3 - 0 0 0 7 0 , DRC2023-00072, SUBTPM20713, and SCH No. 2023080369)
Honorable Mayor and Councilmembers:

On June 11, 2025, Golden State Environmental Justice Alliance ("GSEJA") submitted a comment letter (the "GSEJA Comment Letter") to the City regarding the adequacy of the CEQA analysis, and opposing the project approvals for, the construction and operation of a manufacturing, distribution, light industrial, and office facility with respect to City of Rancho Cucamonga File Nos. DRC2023-00067, DRC2023-00068, DRC2023-00070, DRC2023-00072, and SUBTPM20713, and State Clearinghouse No. 2023080369 (the "Project"). The Project is currently scheduled
to be heard by the City Council on November 5, 2025.

On behalf of GSEJA, I hereby notify you that GSEJA no longer opposes the Project and the applicant has addressed GSEJA's concerns. Therefore, GSEJA hereby withdraws the GSEJA Comment Letter.
2025-11-05 - ITEM G1 - Correspondence Received

Page 269 ends

SMRH:4934-3330-9552.4 A
Rancho Cucamonga City Council
October 29, 2025

Page 2 ends

Sincerely,
Golden State Environmental Justice Alliance
geoi �
D' ector

Page 270 ends