Agenda
Regular Meeting
Redding City Council
Council Chambers (Doors open 30 minutes prior)
777 Cypress Avenue, Redding, CA
September 6, 2022
6:00 PM
This meeting will include teleconference participation by Mayor Pro Tempore Mark Mezzano (Government Code Section 54953). In addition to the meeting location above, members of the public may participate in the meeting from the following teleconference location:
The Westin Long Beach (Lobby)
333 East Ocean Boulevard
Long Beach, CA 90802
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
1. CALL TO ORDER - MAYOR KRISTEN SCHREDER
A. Pledge of Allegiance
B. Invocation - Debbie Ivey, Redding Police and Fire Departments' Chaplain C. Roll Call
2. PRESENTATION(S)
2A. Presentation by Danny Orloff, Tourism Marketing Director for Visit Redding, regarding past, present, and future tourism efforts for the City of Redding.
3. PUBLIC COMMENT - for non-agendized matters within the city’s jurisdiction.
PURSUANT TO THE BROWN ACT, CITY COUNCIL CANNOT TAKE ACTION ON PUBLIC
COMMENT ITEMS
The City Council will allocate up to a maximum of three minutes per speaker for 30 minutes total, at the beginning of the meeting for Public Comment for non-agendized matters within the City’s jurisdiction.
The Mayor will determine the order of the speakers. If 30 minutes is not adequate to accommodate all of the individuals who have submitted a Speaker Request Form to the City Clerk, the Council will trail this item to the end of the open session agenda. The remaining speakers will address the City Council at that time.
If anyone wishes to address the City Council on any item considered at this meeting before or during Council’s consideration of that item, please fill out a blue Speaker Request Form, located in the lighted alcoves at the back of the Council Chambers, and submit it to the City Clerk. The City Council will allocate up to a maximum of three minutes per speaker for each agenda item. Staff reports are available on-line at the City’s web site at www.cityofredding.org or in the Public View binder located on the podium at the north side of the Chambers.
PLEASE SILENCE YOUR CELL PHONES. THANK YOU.
Redding City Council September 6, 2022
4. CONSENT CALENDAR
The Consent Calendar contains items considered routine and/or which have been individually scrutinized by City Council Members and are anticipated to require no further deliberation. If a member of the public wishes to address an item on the Consent Calendar, please fill out a Speaker Request Form and submit it to the City Clerk before the Consent Calendar is considered. It shall be the prerogative of any Council Member, before the Consent Calendar is acted upon, to: (1) comment on an item; (2) respond to any public comment on an item; (3) request the record reflect an abstention or nay vote on an item; or (4) remove an item and place it on the Regular portion of the agenda for delivery of a staff report and/or an extended discussion or deliberation. 4(a). Approve Minutes: Special Meeting – Budget Workshop of February 17, 2022; Regular Meeting of June 7, 2022; Special Meeting – Closed Session of June 21, 2022; Special Meeting – Closed Session of July 19, 2022; Special Meeting of July 19, 2022; Special Meeting – Riverfront Open House of July 25, 2022; Special Meeting – Closed Session of August 2, 2022; June 21, 2022; Special Meeting – Closed Session of July 19, 2022; Special Meeting of July 19, 2022; Special Meeting – Riverfront Open House of August 3, 2022; and Special Meeting – Closed Session of August 16, 2022.
4(b). Accept City of Redding Accounts Payable Register No. 3; and Payroll Register No. 3.
4(c). Accept the City of Redding Treasurer’s Report for the month of July 2022. 4(d). Accept City of Redding Proof of Cash reconciliation and ACR133 report for the month of July 2022.
4(e). Adopt Ordinance No. 2653, an ordinance of the City Council of the City of Redding, amending Redding Municipal Code Title 11 (Vehicles and Traffic), Chapter 11.12 (Speed Limits) by amending Section 11.12.010 (Established on Certain Streets) to update Volume IV, relative to speed limits on certain streets in the City of Redding.
4.1(b). Authorize submission of a grant application to the United States Department of Transportation Safe Streets and Roads for All (SS4A) Program for $300,000 to fund an eligible action plan which would establish eligibility for future SS4A implementation funding opportunities between $5,000,000 and $30,000,000.
4.2(a). Authorize the following actions relative to Benton Field Runway and Taxiway Connector Pavement Preservation and Magnetic Variations Updates Project:
(1) Adopt Resolution approving the submission of a California Department of Transportation grant application in the amount of $22,050 to be utilized as state match funding for the Project; and
(2) Authorize the City Manager, or designee, to execute the grant application, submit all subsequent documentation necessary to obtain grant funds for the project, and appropriate all grant funds received to the Airport Enterprise Fund.
Redding City Council September 6, 2022
4.2(b). Authorize and approve the following:
(1) Authorize submission of a grant application to the United States Economic Development Administration’s Public Works and Economic Adjustment Assistance Program in the amount of $9,193,862 to support Block 7 Project infrastructure improvements to the California-Market Alley, Butte Street, and Yuba Street; and
(2) Based on the facts in the record, make the findings that the subject action is categorically exempt under California Environmental Quality Act Guidelines Section 15302. The project area does not have significant values for wildlife habitat or other environmental resources, and the project has no potential to have a significant effect on the environment; and the project will not result in a significant impact on the quality of the human environment under the National Environmental Policy Act, Environmental Assessment pursuant to Title 24 Code of Federal Regulations (CFR) Section 58.36, Finding of No Significant Impact Title 24 CFR Section 58.40(g)(1); and Title 40 CFR Section 1508.27.
4.3(a). Authorize the City Manager or designee, to approve the procurement of a new access control system for Redding Electric Utility locations deemed as medium impact locations, based on standards as set forth by North American Electric Reliability Corporation, in an amount not to exceed amount of $60,000.
4.5(b). Authorize the following actions related to repairs at the Redding Power Plant:
(1) Approve the sole-source purchase of three replacement Continuous Emission Monitoring Systems from Custom Instrumentation Services Corporation in an amount not to exceed $532,000 for generating Units 1, 2, and 3 at the Redding Power Plant;
(2) Authorize the City Manager, or designee, to execute agreements and approve expenditures up to $40,000 for unforeseen issues that may arise; and
(3) Find that the project is categorically exempt from review under the California Environmental Quality Act pursuant to Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction).
4.6(a). Approve the First Amendment to Caldwell Recreation Center Lease (C-7389) with Turtle Bay Exploration Park to extend the term for an additional three years at Caldwell Recreation Center to store artwork and artifacts, with a term expiring September 26, 2025.
4.8(a). Authorize submission of a grant application to the United States Forest Service Community Wildfire Defense Grant – West Program for the amount of $250,000 to augment funding for the City of Redding Community Wildfire Protection Plan Project.
4.9(a). Authorize and ratify the submission of an application for the U.S. Department of Justice 2022 Edward Byrne Memorial Justice Assistance Grant in the amount of $33,408 to fund Gang/Probation/Parole overtime operations and to purchase crime analysis software for the Redding Police Department; and authorize the City Manager to sign the grant application's Certifications and Assurances signifying that the governing body was notified of the application and citizens were provided the opportunity to comment on the application.
Redding City Council September 6, 2022
4.11(a). Authorize the following actions:
(1) Approve the acquisition of Public Services Easements at 5015 Bechelli Lane (Assessor’s Parcel Number (APN) 070-320-016); 1611 Dakota Way (APN 116-410-006) and 1620 Tidmore Court (APN 116-410-007) at no cost to the City;
(2) Authorize the Mayor to execute all legal documents necessary to complete the acquisitions; and
(3) Find this action to be consistent with the General Plan and exempt from environmental review under the California Environmental Quality Act pursuant to Title 14 California Code of Regulations Section 15061(b)(3), Common Sense Exemption.
4.11(c). Authorize the following related to the purchase of one 2022 AlJon Advantage 500 Compactor for the City of Redding Solid Waste Utility:
(1) Authorize the purchase using Houston-Galveston Area Council contract pricing, with a net delivered cost of $977,249.79, including all applicable taxes and fees; and
(2) Authorize the City Manager to approve future pricing adjustments, terms, and policy changes as needed due to inflation and unstable economic conditions up to a total of $30,000.
4.11(d). Authorize the following actions relative to Bid Schedule No. 5257 (Job No. 9943) Reconstruction of Terminal Building Access Roads Project Phase 2:
(1) Approve and award to Tullis, Inc., an additional amount of $56,575 for a traffic control plan required for the safe completion of Phase 2; (2) Authorize staff to execute a Contract Change Order with Tullis, Inc., in the amount of $845,484 to construct Bid Alternative 2;
(3) Approve $84,000 to provide construction contingency funding and $22,650 for City of Redding staff construction management services; (4) Amend Mead & Hunt, Inc., Authorization of Service 22-07 to provide an additional amount of $134,604 for construction management services for the additional work;
(5) Authorize the City Manager, or designee, to apply for and execute the Federal Aviation Administration grant applications and all subsequent documentation necessary to obtain grant funds for the projects; and (6) Adopt Resolution approving and adopting the 57th Amendment to City Budget Resolution No. 2021-078 appropriating $1,036,530 for the project.
4.11(e). Authorize the Mayor to approve the final map for Luke Estates Subdivision (S01-09) contingent on the approval of the formation of Landscape Maintenance District 01-22; and direct the City Clerk to file the map with the Shasta County Recorder.
4.11(f). Authorize the Public Works Department to submit a grant application for a total amount not to exceed $2,500,000 for Highway Safety Improvement Program funds to the California Department of Transportation for leading pedestrian interval signal operations and for retroreflective tape upgrades to existing traffic signal controllers for visibility improvement at various locations.
Redding City Council September 6, 2022
4.11(g). Authorize staff to reduce retention withheld to one percent and release $223,914.62 to Tullis, Inc., the contractor for Bid Schedule No. 5183 (Job No. 2611) Girvan Road Railroad Crossing Improvements and South Redding Bikeway and Pedestrian Trail Projects.
4.11(h). Approve addition of one full-time Public Works Maintenance Worker position and delete two full-time temporary Public Works Maintenance Worker positions within the City of Redding Wastewater Collections Division; and adopt Resolution approving the 58th Amendment to City Budget Resolution 2021-078 appropriating $0 for the creation of the full-time position.
4.11(i). Authorize the following relative to the closure of a portion of Mark Street to Vehicular Traffic adjacent to 3211 Mark Street (Assessor’s Parcel No. 108-360- 026):
(1) Adopt Resolution closing Mark Street north of Ellis Street to vehicular traffic except for emergency vehicles; and
(2) Find that the action is categorically exempt from review under the California Environmental Quality Act Guidelines, pursuant to Section 15061(b)(3) – Common Sense Exemption.
4.11(j). Authorize the following actions relative to Request for Proposals (RFP) (Schedule No. 5285), Construction Management and Inspection Services for the Clear Creek Wastewater Treatment Plant (CCWTP) Pyrolysis Phase 1 Project:
(1) Award RFP to Water Works Engineers, LLC;
(2) Authorize the Mayor to execute a Consulting and Professional Services Contract for a not-to-exceed fee of $632,937 with Water Works Engineers, LLC, to provide Construction Management and Inspection Services for the CCWTP Pyrolysis Phase 1 Project; and
(3) Authorize the City Manager to approve contract amendment increases up to $50,000.
4.11(k). Authorize the following actions relative to the City of Redding Master Service Agreement (C-3386) with the Tribal Council of the Redding Rancheria to provide Water and Wastewater Utility Services:
(1) Authorize staff to negotiate and the Mayor to execute a Second Amendment to extend the term of the Agreement (C-3386) for six months to April 2, 2023; and
(2) Find that the activity is categorically exempt from review under the California Environmental Quality Act Guidelines, pursuant to Section 15301(a and d) – Existing Facilities.
4.15(a). Adopt Resolution adjusting the City of Redding Executive Management PayFor-Performance Salary Plan for the newly created classification titled Deputy Building Official, effective September 18, 2022.
RECOMMENDATION: ACCEPT, ACKNOWLEDGE, ADOPT, APPROVE,
AND/OR AUTHORIZE ALL ITEMS ON THE CONSENT CALENDAR.
Redding City Council September 6, 2022
6. PUBLIC HEARINGS
A court challenge to action taken by the City Council on any project or decision may be limited to only those issues raised during the public hearing or in written correspondence delivered to the City Council during, or prior to, the public hearing.
Public Works
6.1. Public Hearing to consider adopting a Resolution forming Landscape Maintenance District 01-22 (Luke Estates).
Recommendation:
Conduct a Public Hearing and, upon conclusion, if the majority of the voting property owners are not opposed to the formation of Landscape Maintenance District (LMD) 01-22 (Luke Estates), adopt a Resolution:
(1) Confirming results of the election of the assessment district; (2) Confirming the assessments contained in the Engineer’s Report for said District;
(3) Ordering the formation of territory into LMD 01-22 for Fiscal Year 2022-23; and
(4) Approving the annual assessments for Fiscal Year 2022-23, pursuant to the Landscaping and Lighting Act of 1972, commencing with Section 22500 of the Streets and Highways Code and levying and collecting of the same for Fiscal Year 2022-23.
9. REGULAR CALENDAR: REPORTS & COMMUNICATIONS OF DEPARTMENTS,
BOARDS, COMMISSIONS AND COMMITTEES
Council Member Julie Winter
9A. Consider placement of signs at the Redding City Limits recognizing the Wintu People.
Recommendation:
Approve the installation of signs at key entrance locations into the City of Redding welcoming people to Wintu Country; and authorize the City Engineer to place additional signs as deemed appropriate or necessary, and as approved by the City Engineer and the California Department of Transportation.
City Manager
9.1(a). Consider report of City of Redding's (City) Activities Related to Homelessness.
Recommendation:
Accept report of the City’s efforts in the past five years to assist the unsheltered community and address the associated impacts in response to homelessness; and provide direction to staff, as needed.
Redding City Council September 6, 2022
Development Services
9.4(a). Consider distribution of Request for Proposal (RFP) for the update of the Redding Riverfront Specific Plan (RRSP) and associated Environmental Impact Report (EIR).
Recommendation:
Authorize staff to publish and distribute the RFP to qualified urban planning and environmental consulting firms for the update of the RRSP and associated EIR; the RFP submittal and review process is anticipated to take approximately 90 days.
9.4(b). Consider formation of Tree Management Ordinance Update Committee (Committee) and define Goals and Objectives of the Committee.
Recommendation:
Authorize and approve the following actions:
(1) Approve formation of the Committee to include 15 members consisting of two members appointed by each City Council member, three Planning Commissioners, and two Community Services Advisory Commission members; and
(2) Approve the Goals and Objectives of the Committee to include a review of the existing Tree Management Ordinance, identify deficiencies, and make recommendations for updates and improvements to the ordinance including organization, layout, and structure.
Electric Utility
9.5(a). Consider the Consulting and Professional Services Contract with SSP Innovations, Inc. for the Lifecycle Workforce Management Software Program, and adopt a resolution appropriating funds.
Recommendation:
Authorize the following actions relative to the scope of work for implementation of the City of Redding Electric Utility’s Workforce Management Program:
(1) Approve a Consulting and Professional Services Contract with SSP Innovations, Inc., in the amount of $1,149,589.38 for the design, development, implementation, and maintenance of the Lifecycle Workforce Management Software Program;
(2) Approve an additional $50,000 for the acquisition of information technology hardware necessary to operate the program;
(3) Adopt Resolution approving and adopting the 55th Amendment to City Budget Resolution No 2021-078 appropriating $1,230,000 for capital components of the program, which includes a 20 percent contingency; (4) Authorize the City Manager, or designee, to approve future increases in the contract amount up to $205,000 during the initial six-year term, to allow for unforeseen design and development needs due to workflow adaptations or other situations not considered in the initial contract; and (5) Authorize the City Manager, or designee, to execute the contract, future contract amendments, and term extensions for up to six additional years after the initial six-year term.
Redding City Council September 6, 2022
11. COUNCIL TRAVEL REPORT(S)
City Council Member attendance at conference/meetings reimbursed at City expense. {Requirement of Assembly Bill 1234}
[A-050-060]
Information Only
12. SUGGESTIONS FROM COUNCIL MEMBERS RELATIVE TO POTENTIAL TOPICS
FOR FUTURE CITY COUNCIL MEETINGS
13. ADJOURNMENT
Pursuant to the Brown Act, non-confidential materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are available for inspection during normal business hours at the Office of the City Clerk, 3rd Floor, City Hall, 777 Cypress Avenue, Redding, California.
City Council Meetings will be televised live on Shasta Community Access Channels via Charter/Spectrum Cable channel 181, and will be rerun on Thursday at 12:30 p.m. during the week in which the meeting is held. Additionally, the meeting can be viewed online at the following: http://scac.cablecast.tv:8080/CablecastPublicSite/watch/4?channel=1. Video of the City Council meetings can also be viewed on the City’s web site at http://www.cityofredding.org/. Open the City’s meetings and agendas portal; Click on tab named "Meetings Videos" and select Redding City Council under “Available Archives 2022” select the desired date, then click on “video” to view the meeting.
In compliance with Title II of the Americans with Disabilities Act, the City of Redding will make available to persons with disabilities modifications or accommodations including auxiliary aids or services necessary to participate in public meetings. A person needing assistance should contact the Redding City Clerk by telephone at (530) 225-4447 or in person, or by mail at 777 Cypress Avenue, 3rd Floor, Redding, California 96001 at least three (3) working days in advance.
The City of Redding will ensure that no person shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination under any of its projects, activities, services, or business opportunities on the basis of race, color, national origin, age, sex, or disability, as afforded by Title VI of the Civil Rights Act of 1964 and related statutes as amended. All persons, regardless of their citizenship status, are covered under this regulation.
Questions, complaints, or requests for accommodations or additional information may be forwarded to the ADA & Title VI Coordinator at 777 Cypress Avenue, Attn: Personnel Dept., Redding, California 96001, Phone (530) 225-4065.
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Presentation by Danny Orloff, Tourism Marketing Director for Visit Redding, regarding past, present, and future tourism efforts for the City of Redding.
MEETING DATE: September 6, 2022
ITEM NO. 2A
FROM:
***APPROVED BY***
[email protected]
SUBJECT: 2A--Presentation by Danny Orloff of Visit Redding regarding Redding tourism updates.
Kim Niemer, Community
Services Director
Packet Pg. 9
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Approve Minutes: Special Meeting – Budget Workshop of February 17, 2022; Regular Meeting of June 7, 2022; Special Meeting – Closed Session of June 21, 2022; Special Meeting – Closed Session of July 19, 2022; Special Meeting of July 19, 2022; Special Meeting – Riverfront Open House of July 25, 2022; Special Meeting – Closed Session of August 2, 2022; June 21, 2022; Special Meeting – Closed Session of July 19, 2022; Special Meeting of July 19, 2022; Special Meeting – Riverfront Open House of August 3, 2022; and Special Meeting – Closed Session of August 16, 2022.
Attachments
Unofficial Minutes - February 17, 2022 - Special Meeting - Budget Workshop Unofficial Minutes - June 7, 2022 - Regular Meeting
Unoffiical Minutes - June 21, 2022 - Special Meeting - Closed Session Unoffiical Minutes - July 19, 2022 - Special Meeting - Closed Session Unoffiical Minutes - July 19, 2022 - Special Meeting
Unoffiical Minutes - July 25, 2022 - Special Meeting - Riverfront Open House Unoffiical Minutes - August 2, 2022 - Special Meeting - Closed Session Unofficial Minutes - August 3, 2022 - Special Meeting - Riverfront Open House Unofficial Minutes - August 16, 2022 - Special Meeting - Closed Session MEETING DATE: September 6, 2022
ITEM NO. 4(a)
FROM:
***APPROVED BY***
[email protected]
[email protected]
SUBJECT: 4(a)--Approve City Council Minutes.
Pamela Mize, City Clerk
Packet Pg. 10
503
02/17/2022
Unofficial Minutes
Redding City Council, Special Meeting
Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
February 17, 2022, 2:00 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The Special Meeting - Budget Workshop was called to order by Mayor Kristen Schreder with the following Council Members present: Mark Mezzano, Erin Resner, and Julie Winter.
Council Member Michael Dacquisto participated telephonically. All votes were taken by roll call.
Also present were: City Manager Barry Tippin, Assistant City Manager Sheri DeMaagd, City Attorney Barry DeWalt, Assistant City Clerk Sharlene Tipton, Executive Assistant Luisa Klapperich, and Executive Assistant Amber DalPoggetto.
3A. City of Redding mid-year budget review.
Finance Officer Greg Robinett provided a PowerPoint presentation and summarized the Report to City Council (staff report), both incorporated herein by reference.
A discussion amongst the Council ensued.
The City Council accepted the Fiscal Year 2021-22 Mid-Year Budget Report for the City of Redding by consensus.
City Manager Tippin noted that agenda items 3B and 3C would be present together and provided a PowerPoint presentation and summarized the Reports to City Council (staff reports), all incorporated herein by reference.
Public Comment regarding Items 3B and 3C:
Ryan Gunstream requested to work with the City on future developments.
Kristen Lyons, Shasta Family YMCA CEO, proposed the YMCA be a collaborative gateway to Downtown Redding.
Nick Gardner voiced his concern regarding possible “strings attached” to SLFR Funds. 3B. Consider new expenditures for the City of Redding General Fund and provide direction to staff to prepare a budget resolution for future consideration as part of the mid-year budget update to appropriate the necessary funds.
A MOTION WAS MADE by Council Member Dacquisto, seconded by Council Member Winter to affirm the Council’s interest in obtaining bond funding to fix, replace, rehabilitate and/or build existing and new fire stations; and to direct staff to develop a preliminary statement containing the information necessary for issuance of a bond, include covenants, bond restrictions, the timing funds would be received, and repayment schedule and return to Council at a future meeting for consideration.
The Vote by roll call: Unanimous Ayes
A MOTION WAS MADE by Council Member Winter, seconded by Council Member Mezzano to forgive the loan in the approximate amount of $3.5 million from Redding Electric Utility (REU) to the General Fund which was used to pay for a portion of the replacement of soccer fields and instead use the funds toward the bond debt or in other areas.
The Vote by roll call:
AYES: Council Members – Mezzano, Winter, and Schreder
NOES: Council Members – Dacquisto and Resner
ABSTAIN: Council Members – None
ABSENT: Council Members – None
Packet Pg. 11
Attachment: Unofficial Minutes - February 17, 2022 - Special Meeting - Budget Workshop (4(a)--Approve City Council Minutes) 504
02/17/2022
A MOTION WAS MADE by Council Member Resner, seconded by Council Member Mezzano to authorize a budget increase for the Police Department to add five new police officer positions for the new Beat 8 and to utilize American Rescue Plan Act (ARPA) funding through fiscal year 2025-26. The Vote by roll call: Unanimous Ayes A MOTION WAS MADE by Council Member Winter, seconded by Council Member Resner to approve increases for City of Redding General Fund expenditures as outlined in Staff Report 3B; and direct staff to return at a future meeting to provide options for potential improvements on Airport Road. The Vote by roll: Unanimous Ayes 3C. Consider the City of Redding Expenditure Plan for use of Coronavirus State and Local Fiscal Recovery (SLFR) Fund, and direct staff to develop budget resolutions for future consideration to appropriate the necessary funds.
A MOTION WAS MADE by Council Member Dacquisto, seconded by Council Member Mezzano to direct staff to develop budget resolutions for future consideration to appropriate the necessary SLFR funds for five police officers and for COVID tests for OSHA and other pandemic related expenses; and to continue the vote on all other recommended expenditures outlined in Staff Report 3C for 30 to 60 days at which time staff will present report regarding the cost of improvements to Airport Road. The motion failed.
The Vote by roll call:
AYES: Council Members – Dacquisto and Mezzano
NOES: Council Members – Resner, Winter, and Schreder
ABSTAIN: Council Members – None
ABSENT: Council Members – None
A MOTION WAS MADE by Council Member Winter, seconded by Council Member Resner to direct staff to develop budget resolutions for future consideration to appropriate the necessary SLFR funds on all recommended expenditures outlined in Staff Report 3C.
The Vote by roll call:
AYES: Council Members – Resner, Winter, and Schreder
NOES: Council Members – Dacquisto and Mezzano
ABSTAIN: Council Members – None
ABSENT: Council Members – None
ADJOURNMENT
There being no further business, Mayor Schreder declared the meeting adjourned at the hour of 4:34 p.m.
APPROVED:
______________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Sharlene Tipton, Assistant City Clerk
Packet Pg. 12
Attachment: Unofficial Minutes - February 17, 2022 - Special Meeting - Budget Workshop (4(a)--Approve City Council Minutes) 547
06/07/2022
Unofficial Minutes
Redding City Council, Regular Meeting
Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
June 7, 2022, 6:00 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto and Mark Mezzano. Council Members Erin Resner and Julie Winter were absent.
Also present were: City Manager Barry Tippin, Assistant City Manager Sheri DeMaagd, City Attorney Barry DeWalt, City Clerk Pamela Mize, and Executive Assistant Luisa Klapperich.
The Pledge of Allegiance to the Flag was led by Mayor Schreder.
The Invocation was provided by Lori Moretti, Redding Police and Fire Departments' Chaplain.
PRESENTATIONS
2A. Mayor’s Proclamation presented to Joanne McCarley, Founder and Executive Director of Compass ShiningCare, Inc., declaring June 3-11, 2022, as Purple City Week; and June 2022 as Elder Abuse Awareness Month in the City of Redding, to bring awareness to elders who suffer from at-risk conditions, such as dementia.
The City Council took no formal action on this informational item.
PUBLIC COMMENT
Lori B. and Richard Guardo spoke regarding land sales.
Steven commented regarding the ballot measure to move the City Clerk and City Treasurer from elected to appointed positions.
Nick Gardner requested a clean-up of dead limbs and grasses to inhibit fire danger.
CONSENT CALENDAR
The following matters were considered inclusively under the Consent Calendar and each Report to City Council (staff report) is incorporated herein by reference:
4(a). Approve Minutes: Regular Meeting of April 19, 2022; Special Meeting – Closed Session of May 3, 2022; Regular Meeting of May 3, 2022; and Special Meeting – Closed Session of May 17, 2022.
4(b). Accept City of Redding Accounts Payable Register No. 21; and Payroll Register No. 23.
Accounts Payable Register No. 21 for the period of April 30, 2022, through May 13, 2022, for a total of $7,323,768.36 for check numbers 170990 through 171302, inclusive, ACH Transfer numbers 18301 through 18346 inclusive, Wire Transfer numbers 11409 through 11429, inclusive; and (2) Payroll Register No. 23 for the period of May 1, 2022 through May 14, 2022, in the amount of $3,753,467.78 for electronic deposit transaction numbers 558811 through 559803, and check numbers 608037 through 608080, inclusive; SUMMARY TOTAL: $11,077,236.14.
4(c). Accept the City of Redding Treasurer’s Report for the month of April 2022.
Packet Pg. 13
Attachment: Unofficial Minutes - June 7, 2022 - Regular Meeting (4(a)--Approve City Council Minutes) 548
06/07/2022
4(d). Accept City of Redding Proof of Cash reconciliation and ACR133 report for the month of April 2022.
4(e). Adopt Ordinance No. 2648, an ordinance of the City Council of the City of Redding, amending Redding Municipal Code Title 9 (Health and Safety) to repeal and reenact Chapter 9.28 (Solid Waste and Recycling).
4.2(a). Authorize and approve the following: (1) approve the Special Project Fund Agreement with Community Foundation of the North State for administration of the City of Redding Nonprofit American Rescue Plan Act grant program; (2) authorize payment of $50,000 for administrative services related to the program; and (3) authorize the City Manager, or designee, to negotiate and sign any agreements necessary to fully execute the program.
4.2(b). Approve and authorize the following: (1) authorize the Mayor to execute the Park Dedication and Easement Agreement with the Shasta-Tehama-Trinity Joint Community College District related to a portion of property located at 1400 Market Street further described and shown on Exhibit A and Exhibit B (the Property and Easement); (2) based on the facts in the record, make the finding that the acceptance of the Property, establishment of an Easement, and the potential development of a park are categorically exempt under California Environmental Quality Act Guideline Section 15061(b)(3) and 15304, Class 4 Minor Alterations to Land; and (3) authorize the City Manager to execute any other documents to complete the Property transaction.
4.5(a). Authorize the following actions related to repairs at the Redding Power Plant: (1) ratify approval of the change order agreements that were needed for Allied Power Group to complete the sole-source repair of Generating Unit 1’s compressor 9th stage hook fit in the amount of $116,000 (includes contingency amount of $6,000); and (2) authorize the City Manager, or designee, to sign any documentation or change orders necessary to finalize the project.
4.6(a). Approve and authorize the following regarding the Lease Agreement with the Shasta County Chemical People, Inc. (C-7293), for property located at 2280 Benton Drive, Building A, in the Diestelhorst Landing Nonprofit Office Park: (1) approve the First Amendment (Amendment) to the Diestelhorst Landing Office Park Land and Building Lease Agreement (C-7293) to extend the term for five years to July 31, 2027; (2) adjust the monthly rental rate to $1,439, effective August 1, 2022, with annual adjustments on January 1st based on actual maintenance expenses for the prior fiscal year, and every three years for long-term maintenance expenses to include adjustments by the national Consumer Price Index for the previous three-year period; and (3) find that the approval of the Amendment is exempt under the California Environmental Quality Act pursuant to 14 CCR 15061 (Common Sense Exemption) because it can be seen with certainty that extension of the lease will not affect a physical change on the environment.
4.6(b). Authorize the following related to Landscape Maintenance Districts (LMDs): (1) adopt Resolution No. 2022-047, a resolution of the City Council of the City of Redding, relative to LMDs A, B, and C authorizing the following: (a) approving the Engineer’s Report for Fiscal Year 2022-23 for the LMDs as filed with the City Clerk; (b) setting a Public Hearing for 6:00 p.m., on July 19, 2022, in the City Council Chambers, 777 Cypress Avenue, Redding, California, regarding the LMDs; (c) declaring the City Council's intention to levy and collect assessments for Fiscal Year 2022-23 pursuant to the Landscaping and Lighting Act of 1972; and (2) adopt Resolution No. 2022-048, a resolution of the City Council of the City of Redding, relative to LMDs D, E, F, G, H, H1, J, K, L, M, N, O, P, Q, R, S, S1, T, U, V, W, 01-06, 02-06, 03-06, 04-06, 05-06, 06- 06, 07-06, 08-06, 09-06, 11-06, 01-07, 02-07, 02-09, 03-09, 01-11, 02-11, 03-11, 01-13, 02-14, 03-14, 01-15, 02-16, 03-16, 01-17, 01-19, 02-19, and 01-20; authorizing the following: (a) approving the Engineer’s Report for Fiscal Year 2022-23 for the LMDs as listed above as filed with the City Clerk; and (b) setting a public hearing for 6:00 p.m., on July 19, 2022, in the City Council Chambers, 777 Cypress Avenue, Redding, California, regarding the LMDs as listed above; and (c) declaring the City Council's intention to levy and collect assessments for Fiscal Year 2022-23 pursuant to the Landscaping and Lighting Act of 1972.
Packet Pg. 14
Attachment: Unofficial Minutes - June 7, 2022 - Regular Meeting (4(a)--Approve City Council Minutes) 549
06/07/2022
4.9(a). Adopt Resolution No. 2022-049, a resolution of the City Council of the City of Redding, authorizing the transfer of funds in the amount of $185,165.51 from the City of Redding Evidence Account to the Redding Police Department for the purchase of office furniture in the amount of approximately $60,000 for the Detective Division, and the remainder to be used for other needed police equipment.
4.10(a).Adopt Resolution No. 2022-050, a resolution of the City Council of the City of Redding, establishing the appropriation limit for Fiscal Year 2022-23 for the City of Redding at $276,455,708.
4.10(b).Approve setting a Public Hearing on June 21, 2022, at 6:00 p.m., in the City Council Chambers, 777 Cypress Avenue, Redding, California, to consider adjustments to the City of Redding’s Schedule of Fees and Service Charges.
4.11(a).Authorize the following actions relative to Bid Schedule No. 5281 (Job No. 4908-52) Electric Vehicle Charging Stations at the Redding Police Department and Redding Power Plant: (1) award to Builder Solutions, Inc., in the amount of $404,290.50; (2) approve an additional $91,000 to cover the cost of administration and inspection fees and $60,000 for project development costs; (3) approve $41,000 to provide construction contingency funding; (4) authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $50,000; and (5) find that the project is categorically exempt from review under the California Environmental Quality Act Guidelines Section 15301 (a), (c), and (d)- Existing Facilities.
4.11(b).Adopt Resolution No. 2022-051, a resolution of the City Council of the City of Redding, relative to Sanitary Sewer Maintenance Districts (SSMD) 01-07 Hope Lane, and 01-19 Seven Bridges, authorizing the following: (1) approving the Engineer’s Reports for Fiscal Year 2022-23 for SSMD 01-07 and SSMD 01-19 as filed with the City Clerk; (2) setting a public hearing for 6:00 p.m. on July 19, 2022, in the City Council Chambers, located at 777 Cypress Avenue, Redding, California; and (3) declaring the City Council’s intention to levy and collect assessments for Fiscal Year 2022–23 pursuant to the State of California Improvement Act of 1911.
4.11(c).Authorize the following actions relative to Bid Schedule No. 5822, Enterprise-Anderson Groundwater Sustainability Agency Monitoring Well (Project): (1) award to Gregg Drilling, LLC, in the amount of $278,940; and (2) find that, based on evidence in the record, the Project is categorically exempt from review under the California Environmental Quality Act per Section 15303 – New Construction and Section 15306 – Information Collection.
4.11(d).Authorize the following actions relative to Bid Schedule No. 5286 (Job No. 2667), East Cypress Avenue Storm Drain Replacement Project: (1) award to Northstate Earth and Water, Inc., in the amount of $322,472.07; (2) approve an additional $85,000 to cover the cost of administration and inspection fees; (3) approve $35,000 to provide construction contingency funding; (4) approve $30,000 for project development including environmental and permits; (5) authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $15,000; and (6) find that the Project is categorically exempt from the California Environmental Quality Act per Section 15301(b) – Existing Facilities.
4.11(e).Authorize the Public Works Department to submit four grant applications for a total amount not to exceed $26.3 million for Active Transportation Program funds to the California Department of Transportation for improvements along: (1) Victor Avenue, Mistletoe Lane, and Neighborhood Greenways; (2) Butte Street, Shasta Street, Placer Road, and Neighborhood Greenways; (3) Hilltop Drive side path replacement and road diet; and (4) Park Marina Drive – Quick Build application.
Packet Pg. 15
Attachment: Unofficial Minutes - June 7, 2022 - Regular Meeting (4(a)--Approve City Council Minutes) 550
06/07/2022
A MOTION WAS MADE by Council Member Dacquisto, seconded by Council Member Mezzano, that the foregoing items on the Consent Calendar be accepted, acknowledged, adopted, approved, and/or authorized as recommended.
The Vote:
AYES: Council Members – Dacquisto, Mezzano, and Schreder NOES: Council Members – None
ABSTAIN: Council Members – None
ABSENT: Council Members – Resner and Winter
Resolution No. 2022-047 through No. 2022-051 are on file in the Office of the City Clerk.
Ordinance No. 2648 is on file in the Office of the City Clerk.
APPOINTMENTS
5.1. Mayor's appointments and reappointment of City of Redding representatives to the Economic Development Corporation of Shasta County (EDC) Board of Directors (Board).
A MOTION WAS MADE by Council Member Mezzano, seconded by Council Member Dacquisto, to approve the Mayor’s recommendation to: (1) appoint Heidi Corrigan and Garrett Brown to the EDC’s Board to serve a four-year term beginning July 1, 2022, and ending June 30, 2026; and (2) reappoint EDC Board Member Keith Hunting to serve an additional four-year term effective July 1, 2022, and expiring June 30, 2026.
The Vote:
AYES: Council Members – Dacquisto, Mezzano, and Schreder NOES: Council Members – None
ABSTAIN: Council Members – None
ABSENT: Council Members – Resner and Winter
PUBLIC HEARINGS
6.1. Public Hearing to consider the 2022-23 Action Plan for submission to the United States Department of Housing and Urban Development.
Housing Manager Nicole Smith summarized the Report to City Council (staff report), incorporated herein by reference.
The hour of 6:33 p.m. having arrived, Mayor Schreder opened the Public Hearing.
Mayor Schreder determined that no one present wished to address this matter and closed the Public Hearing.
The Affidavit of Publication – Notice of Public Hearing is on file in the Office of the City Clerk.
A MOTION WAS MADE by Council Member Dacquisto, seconded by Council Member Mezzano, to adopt Resolution No. 2022-052, a resolution of the City Council of the City of Redding, accepting the proposed Annual Action Plan for 2022-23; and authorize the City Manager, or designee, to sign all necessary documents to submit the Action Plan to the United States Department of Housing and Urban Development.
The Vote:
AYES: Council Members – Dacquisto, Mezzano, and Schreder NOES: Council Members – None
ABSTAIN: Council Members – None
ABSENT: Council Members – Resner and Winter
Resolution No. 2022-052 is on file in the Office of the City Clerk.
Packet Pg. 16
Attachment: Unofficial Minutes - June 7, 2022 - Regular Meeting (4(a)--Approve City Council Minutes) 551
06/07/2022
COUNCIL TRAVEL REPORT(S)
Council Member Mezzano attended the League of California Cities, Sacramento Valley Division Meeting on May 20, 2022, held in Mt. Shasta, California.
ADJOURNMENT
There being no further business, at the hour of 6:36 p.m. Mayor Schreder declared the meeting adjourned.
APPROVED:
_______________________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 17
Attachment: Unofficial Minutes - June 7, 2022 - Regular Meeting (4(a)--Approve City Council Minutes) 551
06/21/2022
Unofficial Minutes
Redding City Council, Special Meeting
Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
June 21, 2022, 5:15 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto, Mark Mezzano, Erin Resner, and Julie Winter.
Also present were: Assistant City Manager Sheri DeMaagd, Assistant City Manager Steve Bade, City Attorney Barry DeWalt, and Executive Assistant Luisa Klapperich called the roll prior to leaving the Closed Session meeting. City Manager Barry Tippin participated telephonically.
PUBLIC COMMENT
Mayor Schreder determined that no one present wished to address the items agendized for Closed Session.
CLOSED SESSION
At the hour of 5:16 p.m., Mayor Schreder opened the Special Meeting and announced that the Council would adjourn to Closed Session.
3A. Closed Session pursuant to California Government Code Section 54956.9(d)(1):
CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Redding Rancheria v. City of Redding; Shasta County Superior Court Case No. 195500 Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
3B. Closed Session pursuant to California Government Code Section 54957.6:
CONFERENCE WITH LABOR NEGOTIATOR
Designated Agency Representative: Assistant City Manager/Personnel Director DeMaagd
Employee Organizations:
(1) Local Union 1245 of International Brotherhood of Electrical Workers AFLCIO – Electric Employees; (2) Local Union 1245 of International Brotherhood of Electrical Workers AFLCIO – Maintenance Employees; (3) Redding Peace Officers’ Association – Miscellaneous Employees; (4) Redding Independent Employees’ Organization - Clerical, Technical and Professional Unit;
(5) Redding Independent Employees’ Organization - Supervisory & Confidential Unit; and
(6) United Public Employees of California – Redding Technical Unit Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
3C. Closed Session pursuant to California Government Code Section 54957(b):
PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Title: City Manager
The City Council unanimously chose to move this item to a future meeting for discussion.
Packet Pg. 18
Attachment: Unoffiical Minutes - June 21, 2022 - Special Meeting - Closed Session (4(a)--Approve City Council Minutes) 552
06/21/2022
ADJOURNMENT
There being no further business, Mayor Schreder declared the meeting adjourned at the hour of 6:02 p.m.
APPROVED:
_______________________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 19
Attachment: Unoffiical Minutes - June 21, 2022 - Special Meeting - Closed Session (4(a)--Approve City Council Minutes) 563
07/19/2022
Unofficial Minutes
Redding City Council, Special Meeting
Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
July 19, 2022, 5:15 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto, Mark Mezzano, Erin Resner, and Julie Winter.
Also present were: City Manager Barry Tippin, Assistant City Manager Sheri DeMaagd, City Attorney Barry DeWalt, and Executive Assistant Luisa Klapperich called the roll prior to leaving the Closed Session meeting.
PUBLIC COMMENT
Mayor Schreder determined that no one present wished to address the items agendized for Closed Session.
CLOSED SESSION
At the hour of 5:15 p.m., Mayor Schreder opened the Special Meeting and announced that the Council would adjourn to Closed Session.
3A. Closed Session pursuant to California Government Code Section 54956.9(d)(1):
CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Warden v. Moore, et al.; U.S. District Court, Eastern District of California Case No. 2:19-CV-00431-MCE-AC
By a unanimous vote, the City Council directed the City Attorney to petition the United States Supreme Court in the case of Warden v. Moore to appeal the decision of the 9th Circuit Court of Appeals to not dismiss the case against Officers Cowan and Weaver on principles of qualified immunity and the application of the Heck doctrine. 3B. Closed Session pursuant to California Government Code Section 54957.6:
CONFERENCE WITH LABOR NEGOTIATOR
Designated Agency Representative: Interim Personnel Director Martinez Employee Organizations:
1. International Brotherhood of Electrical Workers AFL-CIO-Electric Employees; and
2. Unrepresented Employees
Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
3C. Closed Session pursuant to California Government Code Section 54956.8:
CONFERENCE WITH REAL PROPERTY NEGOTIATOR
Property Location: 2525 Tarmac Road; Assessor’s Parcel No. 109-280-056 Agency Negotiator: City Manager Tippin
Negotiating Parties: City of Redding and State Compensation Insurance Fund Under Negotiation: Price and Terms
Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
3D. Closed Session pursuant to California Government Code Section 54957(b):
PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Title: City Manager
Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
Packet Pg. 20
Attachment: Unoffiical Minutes - July 19, 2022 - Special Meeting - Closed Session (4(a)--Approve City Council Minutes) 564
07/19/2022
At the hour of 6:02 p.m., Mayor Schreder announced that Closed Session would be in recess until after the Regular City Council Meeting.
At the hour of 8:40 p.m., Mayor Schreder announced that Council would reconvene the Closed Session.
ADJOURNMENT
There being no further business, Mayor Schreder declared the meeting adjourned at the hour of 9:02 p.m.
APPROVED:
_______________________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 21
Attachment: Unoffiical Minutes - July 19, 2022 - Special Meeting - Closed Session (4(a)--Approve City Council Minutes) 562
07/19/2022
Unofficial Minutes
Redding City Council, Special Meeting
Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
July 19, 2022, 5:10 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto, Mark Mezzano, Erin Resner, and Julie Winter.
Also present were: City Manager Barry Tippin, Assistant City Manager Sheri DeMaagd, Assistant City Manager Steve Bade, City Attorney Barry DeWalt, and Executive Assistant Luisa Klapperich called the roll prior to leaving the Closed Session meeting.
PUBLIC COMMENT
Mayor Schreder determined that no one present wished to address the items agendized for Closed Session.
CLOSED SESSION
At the hour of 5:13 p.m., Mayor Schreder opened the Special Meeting and announced that the Council would adjourn to Closed Session.
3A. Closed Session pursuant to California Government Code Section 54956.9(d)(1):
CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Redding Rancheria v. City of Redding; Shasta County Superior Court Case No. 195500 Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
ADJOURNMENT
There being no further business, Mayor Schreder declared the meeting adjourned at the hour of 6:02 p.m.
APPROVED:
_______________________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 22
Attachment: Unoffiical Minutes - July 19, 2022 - Special Meeting (4(a)--Approve City Council Minutes) 574
07/25/2022
Redding City Council, Special Meeting
Riverfront Specific Plan Open House
777 Cypress Avenue
Redding, CA 96001
July 25, 2022, 5:30 PM
The Civic Center Community Room is fully open to the public and in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto, Mark Mezzano, Erin Resner, and Julie Winter.
Also present were: Assistant City Manager Sheri DeMaagd, City Attorney Barry DeWalt, and City Clerk Pamela Mize.
REGULAR CALENDAR: REPORTS & COMMUNICATIONS OF DEPARTMENTS,
BOARDS, COMMISSIONS AND COMMITTEES
2. Public gathering to participate in the Riverfront Specific Plan Open House hosted by the City of Redding.
The City Council took no formal action on this informational item.
ADJOURNMENT
At the hour of 6:24 p.m., there was no longer a quorum of Council Members and the meeting was adjourned.
APPROVED:
______________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 23
Attachment: Unoffiical Minutes - July 25, 2022 - Special Meeting - Riverfront Open House (4(a)--Approve City Council Minutes) 563
08/02/2022
Unofficial Minutes Redding City Council, Special Meeting Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
August 2, 2022, 5:15 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto, Mark Mezzano, Erin Resner, and Julie Winter.
Also present were: City Manager Barry Tippin, Assistant City Manager Sheri DeMaagd, City Attorney Barry DeWalt, and Executive Assistant Luisa Klapperich called the roll prior to leaving the Closed Session meeting.
PUBLIC COMMENT
Mayor Schreder determined that no one present wished to address the items agendized for Closed Session.
CLOSED SESSION
At the hour of 5:17 p.m., Mayor Schreder opened the Special Meeting and announced that the Council would adjourn to Closed Session.
3A. Closed Session pursuant to California Government Code Section 54957.6:
CONFERENCE WITH LABOR NEGOTIATOR
Designated Agency Representative: Interim Personnel Director Martinez Employee Organizations:
1. Local 1934 of International Association of Fire Fighters
2. International Brotherhood of Electrical Workers AFL-CIO-Electric Employees
3. International Brotherhood of Electrical Workers AFL-CIO-Maintenance Employees
Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
3B. Closed Session pursuant to California Government Code Section 54957(b):
PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Title: City Manager
Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
At the hour of 6:02 p.m., Mayor Schreder announced that Closed Session would be in recess until after the Regular City Council Meeting.
At the hour of 8:43 p.m., Mayor Schreder announced that Council would reconvene the Closed Session.
ADJOURNMENT
There being no further business, Mayor Schreder declared the meeting adjourned at the hour of 9:29 p.m.
APPROVED:
_______________________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 24
Attachment: Unoffiical Minutes - August 2, 2022 - Special Meeting - Closed Session (4(a)--Approve City Council Minutes) 102
08/03/2022
Redding City Council, Special Meeting
Riverfront Specific Plan Open House
777 Cypress Avenue
Redding, CA 96001
August 3, 2022, 5:30 PM
The Civic Center Community Room is fully open to the public and in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was cancelled due to a lack of quorum.
REGULAR CALENDAR: REPORTS & COMMUNICATIONS OF DEPARTMENTS,
BOARDS, COMMISSIONS AND COMMITTEES
1. Public gathering to participate in the Redding Riverfront Specific Plan Update Open House hosted by the City of Redding.
The City Council took no formal action on this informational item.
APPROVED:
______________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 25
Attachment: Unofficial Minutes - August 3, 2022 - Special Meeting - Riverfront Open House (4(a)--Approve City Council Minutes) 583
08/16/2022
Unofficial Minutes Redding City Council, Special Meeting Civic Center Council Chambers
777 Cypress Avenue
Redding, CA 96001
August 16, 2022, 5:15 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
The meeting was called to order by Mayor Kristen Schreder with the following Council Members present: Michael Dacquisto, Mark Mezzano, Erin Resner, and Julie Winter.
Also present were: City Manager Barry Tippin, Assistant City Manager Sheri DeMaagd, Assistant City Manager Steve Bade, City Attorney Barry DeWalt, and Executive Assistant Luisa Klapperich called the roll prior to leaving the Closed Session meeting.
PUBLIC COMMENT
Mayor Schreder determined that no one present wished to address the items agendized for Closed Session.
CLOSED SESSION
At the hour of 5:18 p.m., Mayor Schreder opened the Special Meeting and announced that the Council would adjourn to Closed Session.
3A. Closed Session pursuant to California Government Code Section 54956.9(d)(1):
CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Saechao v. City of Redding, et al.; Shasta County Superior Court Case No. 198768 Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
3B. Closed Session pursuant to California Government Code Section 54957.6:
CONFERENCE WITH LABOR NEGOTIATOR
Designated Agency Representative: Interim Personnel Director Martinez Employee Organizations:
1. Local 1934 of International Association of Fire Fighters
2. International Brotherhood of Electrical Workers AFL-CIO-Electric Employees
3. International Brotherhood of Electrical Workers AFL-CIO-Maintenance Employees
Pursuant to Government Code section 54957.1(a), the City Council took no reportable action on this item.
ADJOURNMENT
There being no further business, Mayor Schreder declared the meeting adjourned at the hour of 6:00 p.m.
APPROVED:
_______________________________
Kristen Schreder, Mayor
ATTEST:
_______________________________
Pamela Mize, City Clerk
Packet Pg. 26
Attachment: Unofficial Minutes - August 16, 2022 - Special Meeting - Closed Session (4(a)--Approve City Council Minutes)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Accept City of Redding Accounts Payable Register No. 3; and Payroll Register No. 3.
Fiscal Impact
There is no fiscal impact to accepting the registers.
Alternative Action
The City Council could choose to not accept the registers and provide direction to staff.
Background/Analysis
Attached are the Accounts Payable and Payroll Registers as follows:
Accounts Payable:
(1) Register Number 3 for the period July 31, 2022 – August 12, 2022, in the amount of $13,656,543.79; and
Payroll:
(1) Register Number 3 for the period July 24, 2022 – August 6, 2022, in the amount of $4,174,410.90.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
MEETING DATE: September 6, 2022
ITEM NO. 4(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4(b)--City of Redding Accounts Payable and Payroll Registers.
Allyn Feci Clark, Director of
Finance/City Treasurer
Packet Pg. 27
Report to Redding City Council August 26, 2022
Re: 4(b)--Accounts Payable and Payroll Registers Page 2 Attachments
Accounts Payable Register No. 3 and Payroll Register No. 3 Packet Pg. 28
Packet Pg. 29
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 30
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 31
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 32
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 33
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 34
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 35
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 36
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 37
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 38
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 39
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 40
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 41
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 42
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 43
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 44
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 45
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 46
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 47
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 48
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 49
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 50
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 51
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 52
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 53
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 54
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 55
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 56
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 57
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 58
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 59
Attachment: Accounts Payable Register No. 3 and Payroll Register No. 3 (4(b)--Accounts Payable and Payroll Registers)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Accept the City of Redding Treasurer’s Report for the month of July 2022.
Fiscal Impact
There is no fiscal impact to accepting the report.
Alternative Action
The City Council could choose to not accept the report and provide direction to staff.
Background/Analysis
Attached is the Treasurer’s Report for the month ended July 31, 2022, the July 2022 Portfolio Management Report, and a summary of the City of Redding’s (City) portfolio. For comparative purposes, prior month information is also reported.
The City’s portfolio meets the requirements of Investment Policy No. 408. The Investment Advisory Committee met on July 28 to perform the required annual review of the investment policy for the City (Policy 408). There were small recommended changes to the subheadings within the investment policy to reflect the Government Finance Officers Association’s (GFOA) best practices. Market values for securities are obtained from US Bank Institutional Trust and Custody Department. The Treasurer’s accountability total may be measured against the Finance Department ACR 133 cash reconciliation report for July 2022.
The effective monthly rate of return for City Treasurer-managed funds during July 2022 was
1.27 percent, a gain of ten basis points from June 2022. The beginning of new Fiscal Year 2022- 23, the rate of return resets to the July rate of 1.27, a gain of fifty-four basis points from Fiscal Year End June 2022 rate of return. A basis point equals one one-hundredth of one percent, or
0.01 percent.
MEETING DATE: September 6, 2022
ITEM NO. 4(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4(c)--City of Redding Treasurer's Report for July 2022.
Allyn Feci Clark, Director of
Finance/City Treasurer
Packet Pg. 60
Report to Redding City Council August 29, 2022
Re: 4(c)--Treasurer's Report - July 2022 Page 2
Investment activity in the portfolio during the month of July 2022 included the purchase of two Federal Agency Coupon Bonds. In addition, there was an adjustment in the Local Agency Investment Fund (LAIF) to accommodate cash flow for the PERS prepayment described below.
The Treasurer’s Accountability changed from $294,576,548 to $269,471,284 a decrease of $25,105,264. In July, the City prepaid its PERS contribution of over $23 million. By prepaying, the City receives a significant savings in excess of $795,000.
The City Treasurer respectfully recommends the City Council accept the attached Treasurer’s Report for July 2022 noting a Total Treasurer’s Accountability of $269,471,284 and an organizational total of $289,284,615 which includes assets held by the City of Redding as Successor Agency to the Redding Redevelopment Agency, as well as Entity and Trustee accounts.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• This is a routine operational item.
Attachments
Treasurer's Report July 2022
Packet Pg. 61
Packet Pg. 62
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 63
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 64
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 65
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 66
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 67
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 68
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 69
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 70
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 71
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 72
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 73
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 74
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 75
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 76
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 77
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 78
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 79
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 80
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 81
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 82
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 83
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022) Packet Pg. 84
Attachment: Treasurer's Report July 2022 (4(c)--Treasurer's Report - July 2022)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Accept City of Redding Proof of Cash reconciliation and ACR133 report for the month of July 2022.
Fiscal Impact
There is no fiscal impact to accepting the report.
Alternative Action
The City Council could choose to not accept the Proof of Cash reconciliation and ACR133 report and provide alternate direction to staff.
Background/Analysis
The City Council has requested a monthly report on pooled cash. The ACR133 report summarizes, by fund, the month-to-date pooled cash balances and transactions. The Proof of Cash reconciles the ACR133 report to the Treasurer’s monthly report.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• This is a routine operational item.
Attachments
^ACR133, Current Cash Balance
^Proof of Cash
MEETING DATE: September 6, 2022
ITEM NO. 4(d)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4(d)--ACR133 Report and Cash Reconciliation for the Month of July 2022.
Allyn Feci Clark, Director of
Finance/City Treasurer
Packet Pg. 85
ACR133 CITY OF REDDING KINGSSYS 15:25:45 8/08/2022
GENERAL ACCOUNTING DATED 8/08/2022
CURRENT CASH BALANCE - CITY COUNCIL REPORT PAGE 1
ENDINGBALANCE7/31/2022
111 GENERAL FUND 28,411,373.08120 ASSET SEIZURE FUND 23,741.81121 ENT ANDERSON GROUNDWATER 183,271.49-122 PARKING FUND 631,582.36123 GENERAL SPECIAL REVENUE 272,517.00124 IPSS SPECIAL REVENUE 1,317,946.09125 ROLLING STOCK REPLACEMNT 8,973,465.66126 SPECL GAS TAX ST IMPROVE 10,310,885.37127 LOCAL TRANSPORTATION 5,810,353.95128 DEVELOPMENT FUND 1,488,431.78-129 LIBRARY 437,116.99130 BRANCH LIBRARIES 31,650.02134 MUNICIPAL AIRPORT FUND 1,235,805.51-140 TOURISM/CONVENTION FUND 32,254.77-142 ELECTRIC UTILITY FUND 48,396,392.73143 WATER UTILITY FUND 55,708,996.63145 WASTEWATER UTILITY FUND 42,756,814.79147 STORM DRAIN UTILITY FUND 8,229,599.64148 WEST CENTRAL LANDFILL 10,836,065.57149 SOLID WASTE COLLECTION 14,666,666.09150 MEDIA, COMMS & PR 124,924.23151 INFORMATION TECHNOLOGY 2,231,235.88153 FLEET MAINTENANCE 302,600.91154 BUILDING MAINT & CONSTR 1,475,464.21158 RECORDS MANAGEMENT 161,242.44160 EMPLOYER SERVICES 92,166.04162 RMU ADMINISTRATION 1,366,202.01165 GEOGRAPHIC INFO SERVICES 562,485.33166 COMMUNICATIONS 232,690.28168 REPROGRAPHICS 99,905.21169 VOLUNTEER SERVICES 3,998.69-171 SPECIAL DEPOSITS FUND 10,652,022.26172 RISK MANAGEMENT 10,315,318.21173 EMPLOYEE BENEFITS P/R 132,761.63174 EMPLOYEE BENEFIT GRP INS 667,787.16175 GASB 45 TRUST FUND 39,271.97178 CAPITAL PROJECTS FUND 4,767,088.08191 CD BLOCK GRANT FUND 1,542,879.99193 HOUSING AUTHORITY 96,183.84-194 REDDING REDEVELOPMENT 18,969.26200 REDDING AREA BUS AUTHOR. 130,346.63-230 LOW/MOD INC HOUS ASSET 857,858.72300 SPECIAL ASSESSMENT DIST. 315,861.78400 LANDSCAPE DISTRICTS 525,213.32 FINAL TOTAL 270,128,823.99
ACR133 15:25:45 8/08/2022
Packet Pg. 86
Attachment: ^ACR133, Current Cash Balance (4(d)--ACR133 Report and Cash Reconciliation - July 2022) Sheet "D" July 2022
CITY OF REDDING
PROOF OF CASH
RECONCILIATION BETWEEN TREASURER'S REPORT AND ACR 133
As of July 2022
ACR133 TREASURER
END OF MONTH BALANCE 270,128,823.99 269,471,283.53
LESS OUTSIDE MANAGED FUNDS (439.06)
ACR133 Report
CASH ACCOUNTS NOT ON ACR133
LIBRARY MERCHANT DEPOSIT 100.00
BAD CHECKS -
PAYROLL TIMING DIFFERENCE 92.28
BANK CHARGES (92,738.74)
WIRE TRANSFER TIMING DIFFERENCE
OTHER ADJUSTMENTS (799,719.71)
BANK DR/CR (234,486.65)
TOTALS 269,236,457.82 269,236,457.82
Packet Pg. 87
Attachment: ^Proof of Cash (4(d)--ACR133 Report and Cash Reconciliation - July 2022)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Adopt Ordinance No. 2653, an ordinance of the City Council of the City of Redding, amending Redding Municipal Code Title 11 (Vehicles and Traffic), Chapter 11.12 (Speed Limits) by amending Section 11.12.010 (Established on Certain Streets) to update Volume IV, relative to speed limits on certain streets in the City of Redding.
Attachments
^Ordinance No. 2653
MEETING DATE: September 6, 2022
ITEM NO. 4(e)
FROM:
***APPROVED BY***
[email protected]
SUBJECT: 4(e)--Adopt Ordinance No. 2653, amending Redding Municipal Code Chapter
11.12, Speed Limits, in the City of Redding
Chuck Aukland, Public
Works Director
Packet Pg. 88
ORDINANCE NO. 2653
AN ORDINANCE OF THE CITY OF REDDING AMENDING TITLE 11
(VEHICLES AND TRAFFIC) CHAPTER 11.12 (SPEED LIMITS) BY
AMENDING SECTION 11.12.010 TO UPDATE VOLUME IV, RELATIVE
TO SPEED LIMITS ON CERTAIN STREETS
THE CITY COUNCIL OF THE CITY OF REDDING DOES ORDAIN AS FOLLOWS:
Section 1. Title 11 (Vehicles and Traffic), Chapter 11.12 (Speed Limits), Volume IV of Section 11.12.010 is hereby amended to read as follows:
11.12.010 - Established on certain streets.
SPEED LIMITS ON VARIOUS STREETS
VOLUME IV
1 ATHENS AVENUE
Cypress Ave. to South St. 30 MPH
2 BELTLINE ROAD
Caterpillar Rd. to Oasis Rd. 40 MPH
3 BENTON DRIVE
Riverside Dr. to N. Market St. 35 MPH
4 BRANSTETTER LANE
Texas Spring Rd. to 300 ft. west of Branstetter Cir. (west) 45 MPH 300 ft. west of Branstetter Cir. (west) to SR 273 35 MPH 5 BUENAVENTURA BOULEVARD
SR 273 to Eureka Way 45 MPH
6 BUTTE STREET
Continental St. to Sundial Bridge Dr. 35 MPH
7 CATERPILLAR ROAD
Beltline Rd. to SR 273 40 MPH
8 CLEAR CREEK ROAD
West City Limit to the A.C.I.D. canal 55 MPH
800 ft. west of SR 273 to SR 273 45 MPH
9 EAST STREET
Pine St. to South St. 30 MPH
South St. to Trinity St. 25 MPH
10 LAKE BOULEVARD
SR 273 to 500 ft. west of Clay St. 40 MPH
500 ft. west of Clay St. to City Limit 45 MPH
11 LOCUST STREET
East St. to Park Marina Dr. 30 MPH
12 PARK MARINA DRIVE
Parkview Ave. to Washington Ave. 35 MPH
Washington Ave. to Sundial Bridge Dr. 40 MPH
13 PARKVIEW AVENUE
First reading done: 08/16/22 CA
For adoption on: 09/06/22 5-0
CC agenda item # 4(d)
Packet Pg. 89
Attachment: ^Ordinance No. 2653 (4(e)--Adopt Ordinance No. 2653 re Amending Speed Limits) SR 273 to Cypress Ave. 35 MPH
14 QUARTZ HILL ROAD
SR 273 to 250 ft. east of U.P. trestle 25 MPH
250 ft. east of U.P. trestle to Snow Ln. 35 MPH
Snow Ln. to Terra Nova Dr. 40 MPH
Terra Nova Dr. to City Limits 45 MPH
Lake Blvd. to City Limits 30 MPH
15 REDWOOD BOULEVARD
Northpoint Dr. to Caterpillar Rd. 25 MPH
16 TWIN VIEW BOULEVARD
SR 273 to Constitution Way 40 MPH
Constitution Way to City Limit 45 MPH
Section 2. The passage of this ordinance is not a “project” according to the definition in the California Environmental Quality Act, and therefore is not subject to the provisions requiring environmental review.
Section 3. Severability. If any provision of this ordinance or the application thereof to any person or circumstance is held invalid, the remainder of the ordinance and the application of such provision will remain in effect to the extent permitted by law.
Section 4. This ordinance shall take effect thirty (30) days after the date of its adoption, and the City Clerk shall certify to the adoption thereof and cause its publication according to law.
I HEREBY CERTIFY that the foregoing ordinance was introduced and read by the City Council of the City of Redding at a regular meeting on the 16th day of August, 2022; and was duly read and adopted at a regular meeting on the _____ day of __________, 2022, by the following vote:
AYES:
NOES:
Council Members:
Council Members:
ABSTAIN: Council Members:
ABSENT: Council Members:
________________________________
KRISTEN SCHREDER, Mayor
ATTEST: FORM APPROVED:
_____________________________ ________________________________ PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
DATE ATTESTED: ____________, 2022
Packet Pg. 90
Attachment: ^Ordinance No. 2653 (4(e)--Adopt Ordinance No. 2653 re Amending Speed Limits)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize submission of a grant application to the United States Department of Transportation Safe Streets and Roads for All (SS4A) Program for $300,000 to fund an eligible action plan which would establish eligibility for future SS4A implementation funding opportunities between $5,000,000 and $30,000,000.
Fiscal Impact
If awarded, the City of Redding (City) would receive up to $300,000 in U.S. Department of Transportation (US DOT) SS4A Program funding with a 20 percent local matching funds requirement that would total approximately $60,000 to the General Fund or equivalent in-kind contributions.
The development of an action plan may open the door to future funding opportunities for infrastructure, behavioral, and operational costs related to the goal of eliminating roadway fatalities. Those opportunities could result in funding between $5,000,000 and $30,000,000 in the four subsequent funding cycles.
Alternative Action
The City Council (Council) may choose not to authorize a grant application to the US DOT SS4A Program; in that case, the City of Redding would not be considered for an award from the US DOT SS4A Program. The City would not be eligible for implementation funding in future funding cycles without an eligible action plan.
MEETING DATE: September 6, 2022
ITEM NO. 4.1(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.1(b)--Authorize Submission of a Grant Application to the U.S. Department of Transportation Safe Streets and Roads for All (SS4A) Program.
Janelle Galbraith, Economic
Development, Innovation &
Equity Manager
Packet Pg. 91
Report to Redding City Council August 29, 2022
Re: 4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program Page 2
Background/Analysis
The Bipartisan Infrastructure Law (BIL) established the new Safe Streets and Roads for All discretionary program with $5 billion in appropriated funds over the next 5 years. Up to $1 billion is available in Fiscal Year 2022 - 23. The aim of the SS4A program is to fund regional, local, and tribal initiatives through grants to prevent roadway deaths and serious injuries.
The SS4A program is comprised of two types of grants – action plan grants and implementation grants. The City would be requesting $300,000 initially for an Action Planning grant. In order to be eligible for implementation grant funding that could pay for design and construction of future projects, the City must either have or develop an eligible action plan. While an eligible action plan does not necessarily have to be Vision Zero, containing a leadership commitment to zero roadway fatalities, the U.S. Department of Transportation states in the SS4A program guidelines that this is a component of an effective action plan.
Once the action plan is completed and adopted, the City would have an opportunity to access funding between $5,000,000 and $30,000,000 in each subsequent application cycle for implementing projects outlined in the new action plan.
Environmental Review
Authorizing the grant application does not have any foreseeable environmental impact.
Opportunities for future environmental review exist before any concrete action is taken. If awarded, the Council will consider whether to accept a grant award or not for the proposed grant activity, which is planning in nature. If the grant agreement is accepted, the development of the plan would include opportunities for public input.
Council Priority/City Manager Goals
• Budget and Financial Management – “Achieve balanced and stable 10-year Financial Plans for all funds.”
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” • Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
Attachments
Grant Guidelines
City of Sacramento Vision Zero Plan
City of Watsonville Vision Zero Plan
Packet Pg. 92
1 Office of the Secretary of Transportation
Notice of Funding Opportunity for the Safe Streets and Roads for All (SS4A) Discretionary Grant Opportunity
Amendment 1
AGENCY: Office of the Secretary of Transportation, U.S. Department of Transportation (DOT or the Department)
ACTION: Notice of Funding Opportunity (NOFO), Assistance Listing # 20.939 SUMMARY: The purpose of this notice is to solicit applications for Safe Streets and Roads for All (SS4A) grants. Funds for the fiscal year (FY) 2022 SS4A grant program are to be awarded on a competitive basis to support planning, infrastructure, behavioral, and operational initiatives to prevent death and serious injury on roads and streets involving all roadway users, including pedestrians; bicyclists; public transportation, personal conveyance, and micromobility users; motorists; and commercial vehicle operators.1
DATES: Applications must be submitted by 5:00 PM EDT on Thursday, September 15, 2022. Late applications will not be accepted.
ADDRESSES: Applications must be submitted through https://www.grants.gov/.
FOR FURTHER CONTACT INFORMATION: Please contact the SS4A grant program staff via email at [email protected], or call Paul Teicher at 202-366-4114. A telecommunications device for the deaf (TDD) is available at 202-366-3993. In addition, DOT will regularly post answers to questions and requests for clarifications, as well as schedule information regarding webinars providing additional guidance, on DOT’s website at https://www.transportation.gov/SS4A. The deadline to submit technical questions is August 15, 2022.
1 The term “pedestrians” is inclusive of all users of the pedestrian infrastructure, including persons with disabilities.
Packet Pg. 93
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 2 SUPPLEMENTARY INFORMATION: Each section of this notice contains information and instructions relevant to the application process for SS4A grants, and all applicants should read this notice in its entirety so that they have the information they need to submit eligible and competitive applications.
N/A SUMMARY INFORMATION
A PROGRAM DESCRIPTION
B FEDERAL AWARD INFORMATION
C ELIGIBILITY INFORMATION
D APPLICATION AND SUBMISSION
INFORMATION
E APPLICATION REVIEW
INFORMATION
F FEDERAL AWARD
ADMINISTRATION INFORMATION
G FEDERAL AWARDING AGENCY
CONTACTS
H OTHER INFORMATION
Section A (Program Description) describes the Department’s goals and purpose in making awards, and Section E (Application Review Information) describes how the Department will select from eligible applications. To support applicants through the process, the Department will provide technical assistance and resources at https://www.transportation.gov/SS4A.
DEFINITIONS
Term Definition
Applicant’s Jurisdiction(s)
The U.S. Census tracts where the applicant
operates or performs their safety responsibilities.
If an applicant is seeking funding for multiple
jurisdictions, all of the relevant Census tracts for
the jurisdictions covered by the application should
be included.
Complete Streets
Standards or policies that ensure the safe and
adequate accommodation of all users of the
transportation system, including pedestrians,
bicyclists, personal conveyance and
micromobility users, public transportation users,
children, older individuals, individuals with
disabilities, motorists, and freight vehicles.2
2 The definition is based on the “Moving to a Complete Streets Design Model: A Report to Congress on Opportunities and Challenges,” https://highways.dot.gov/newsroom/federal-highway-administration-details-efforts-advance-complete-streetsdesign-model Packet Pg. 94
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 3 Term Definition
Comprehensive Safety Action Plan A comprehensive safety action plan (referred to as Action Plan) is aimed at preventing roadway
fatalities and serious injuries in a locality, Tribe,
or region. This can either be a plan developed
with an Action Plan Grant, or a previously
developed plan that is substantially similar and
meets the eligibility requirements (e.g., a Vision
Zero plan or similar plan).
Equity
The consistent and systematic fair, just, and
impartial treatment of all individuals, including
individuals who belong to underserved
communities that have been denied such
treatment, such as Black, Latino, Indigenous and
Native Americans, Asian Americans and Pacific
Islanders, and other persons of color; members of
religious minorities; lesbian, gay, bisexual,
transgender, and queer (LGBTQ+) persons;
persons with disabilities; persons who live in rural
areas; and persons otherwise adversely affected by
persistent poverty or inequality.
High Injury Network
Identifies the highest concentrations of traffic
crashes resulting in serious injuries and fatalities
within a given roadway network or jurisdiction.
Micromobility
Any small, low-speed, human- or electricpowered transportation device, including bicycles, scooters, electric-assist bicycles, electric scooters
(e-scooters), and other small, lightweight, wheeled
conveyances.3
3 Source: FHWA, Public Roads Magazine Spring 2021 “Micromobility: a Travel Innovation.”Publication Number: FHWAHRT-21-003 Packet Pg. 95
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 4 Term Definition
Personal Conveyance
A personal conveyance is a device, other than a
transport device, used by a pedestrian for personal
mobility assistance or recreation. These devices
can be motorized or human powered, but not
propelled by pedaling.4
Political Subdivision of a State
A unit of government created under the authority
of State law. This includes cities, towns, counties,
special districts, certain transit agencies, and
similar units of local government. A transit
district, authority, or public benefit corporation is
eligible if it was created under State law,
including transit authorities operated by political
subdivisions of a State.
Rural
For the purposes of this NOFO, jurisdictions
outside an Urbanized Area (UA) or located within
Urbanized Areas with populations fewer than
200,000 will be considered rural. Lists of UAs are
available on the U.S. Census Bureau website at
http://www2.census.gov/geo/maps/dc10map/UAU
C_RefMap/ua/.
Safe System Approach A guiding principle to address the safety of all road users. It involves a paradigm shift to improve
safety culture, increase collaboration across all
safety stakeholders, and refocus transportation
system design and operation on anticipating
human mistakes and lessening impact forces to
reduce crash severity and save lives. 5,
6 4 https://crashstats.nhtsa.dot.gov/Api/Public/ViewPublication/813251, see page 127 for the full definition as defined in the 2020 FARS/CRSS Coding and Validation Manual. 5 See: https://www.transportation.gov/NRSS/SafeSystem 6 Safety culture can be defined as the shared values, actions, and behaviors that demonstrate a commitment to safety over competing goals and demands.
Packet Pg. 96
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 5 Term Definition
Underserved Community An underserved community as defined for this NOFO is consistent with the Office of
Management and Budget’s Interim Guidance for
the Justice40 Initiative and the Historically
Disadvantaged Community designation, which
includes:
U.S. Census tracts identified in this table and
corresponding map tool that visualizes the
table:
• https://datahub.transportation.gov/stories/s
/tsyd-k6ij and
https://usdot.maps.arcgis.com/apps/das
hboards/99f9268777ff4218867ceedfabe5
8a3a
• Any Tribal land; or
• Any territory or possession of the United
States.
A. Program Description
1. Overview
Section 24112 of the Infrastructure Investment and Jobs Act (Pub. L. 117–58, November 15, 2021; also referred to as the “Bipartisan Infrastructure Law” or “BIL”) authorized and appropriated $1 billion to be awarded by the Department of Transportation for FY 2022 for the SS4A grant program. This NOFO solicits applications for activities to be funded under the SS4A grant program. The FY22 funding will be implemented, as appropriate and consistent with law, in alignment with the priorities in Executive Order 14052, Implementation of the Infrastructure Investment and Jobs Act (86 FR 64355).7 The purpose of SS4A grants is to improve roadway safety by significantly reducing or eliminating roadway fatalities and serious injuries through safety action plan development and implementation focused on all users, including pedestrians, bicyclists, public transportation users, motorists, personal conveyance and micromobility users, and commercial vehicle operators. The program provides funding to develop the tools to help strengthen a community’s approach to roadway safety and save lives and is designed to meet the needs of diverse local, Tribal, and regional communities that differ dramatically in size, location, and experience administering Federal funding.
2. Grant Types and Deliverables
The SS4A program provides funding for two types of grants: Action Plan Grants (for comprehensive safety action plans) and Implementation Grants. Action Plan Grants are used to develop, complete, or supplement a comprehensive safety action plan. To apply for an Implementation Grant, an eligible 7 The priorities of Executive Order 14052, Implementation of the Infrastructure Investments and Jobs Act are: to invest efficiently and equitably, promote the competitiveness of the U.S. economy, improve job opportunities by focusing on high labor standards and equal employment opportunity, strengthen infrastructure resilience to hazards including climate change, and to effectively coordinate with State, local, Tribal, and territorial government partners.
Packet Pg. 97
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 6 applicant must have a qualifying Action Plan. Implementation Grants are available to implement strategies or projects that are consistent with an existing Action Plan. Applicants for Implementation Grants can self-certify that they have in place one or more plans that together are substantially similar to and meet the eligibility requirements for an Action Plan. i. Action Plan Grants
An Action Plan is the foundation of the SS4A grant program. Action Plan Grants provide Federal funds to eligible applicants to develop or complete an Action Plan. Action Plan Grants may also fund supplemental Action Plan activities. The goal of an Action Plan is to develop a holistic, well-defined strategy to prevent roadway fatalities and serious injuries in a locality, Tribe, or region. Further information on eligibility requirements is in Section C.
The primary deliverable for an Action Plan Grant is a publicly available Action Plan. For the purposes of the SS4A grant program, an Action Plan includes the components in Table 1. DOT considers the process of developing an Action Plan to be critical for success, and the components reflect a processoriented set of activities.
Table 1: Action Plan Components
Component Description
Leadership Commitment and Goal Setting An official public commitment (e.g., resolution, policy, ordinance, etc.) by a highranking official and/or governing body (e.g., Mayor, City Council, Tribal Council, MPO
Policy Board, etc.) to an eventual goal of zero
roadway fatalities and serious injuries. The
commitment must include a goal and timeline
for eliminating roadway fatalities and serious
injuries achieved through one, or both, of the
following:
(1) the target date for achieving zero roadway
fatalities and serious injuries, OR
(2) an ambitious percentage reduction of
roadway fatalities and serious injuries by a
specific date with an eventual goal of
eliminating roadway fatalities and serious
injuries.
Planning Structure A committee, task force, implementation group, or similar body charged with oversight
of the Action Plan development,
implementation, and monitoring.
Packet Pg. 98
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 7 Component Description
Safety Analysis Analysis of existing conditions and historical trends that provides a baseline level of crashes
involving fatalities and serious injuries across
a jurisdiction, locality, Tribe, or region.
Includes an analysis of locations where there
are crashes and the severity of the crashes, as
well as contributing factors and crash types by
relevant road users (motorists, people
walking, transit users, etc.). Analysis of
systemic and specific safety needs is also
performed, as needed (e.g., high-risk road
features, specific safety needs of relevant road
users, public health approaches, analysis of
the built environment, demographic, and
structural issues, etc.). To the extent practical,
the analysis should include all roadways
within the jurisdiction, without regard for
ownership. Based on the analysis performed,
a geospatial identification of higher-risk
locations is developed (a High-Injury
Network or equivalent).
Engagement and Collaboration Robust engagement with the public and relevant stakeholders, including the private
sector and community groups, that allows for
both community representation and feedback.
Information received from engagement and
collaboration is analyzed and incorporated
into the Action Plan. Overlapping
jurisdictions are included in the process. Plans
and processes are coordinated and aligned
with other governmental plans and planning
processes to the extent practical.
Equity Considerations Plan development using inclusive and representative processes. Underserved
communities are identified through data and
other analyses in collaboration with
appropriate partners.8 Analysis includes both
population characteristics and initial equity
impact assessments of the proposed projects
and strategies.
8 An underserved community as defined for this NOFO is consistent with the Office of Management and Budget’s Interim Guidance for the Justice40 Initiative (https://www.whitehouse.gov/wp-content/uploads/2021/07/M-21-28.pdf) and the Historically Disadvantaged Community designation, which includes U.S. Census tracts identified in this table and mapping tool https://datahub.transportation.gov/stories/s/tsyd-k6ijand https://usdot.maps.arcgis.com/apps/dashboards/99f9268777ff4218867ceedfabe58a3a; any Tribal land; or any territory or possession of the United States.
Packet Pg. 99
Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 8 Component Description
Policy and Process Changes Assessment of current policies, plans, guidelines, and/or standards (e.g., manuals) to
identify opportunities to improve how
processes prioritize transportation safety. The
Action Plan discusses implementation
through the adoption of revised or new
policies, guidelines, and/or standards, as
appropriate.
Strategy and Project Selections Identification of a comprehensive set of projects and strategies, shaped by data, the
best available evidence and noteworthy
practices, as well as stakeholder input and
equity considerations, that will address the
safety problems described in the Action Plan.
These strategies and countermeasures focus
on a Safe System Approach, effective
interventions, and consider multidisciplinary
activities. To the extent practical, data
limitations are identified and mitigated.
Once identified, the list of projects and
strategies is prioritized in a list that provides
time ranges for when the strategies and
countermeasures will be deployed (e.g.,
short-, mid-, and long-term timeframes). The
list should include specific projects and
strategies, or descriptions of programs of
projects and strategies, and explains
prioritization criteria used. The list should
contain interventions focused on
infrastructure, behavioral, and/or operational
safety.
Progress and Transparency Method to measure progress over time after an Action Plan is developed or updated,
including outcome data. Means to ensure
ongoing transparency is established with
residents and other relevant stakeholders.
Must include, at a minimum, annual public
and accessible reporting on progress toward
reducing roadway fatalities and serious
injuries, and public posting of the Action Plan
online.
a) Supplemental Action Plan Activities:
Supplemental action plan activities support or enhance an existing Action Plan. To fund supplemental Action Plan activities through the SS4A program, an applicant must have an existing Action Plan, or a plan that is substantially similar and meets the eligibility requirements for having an existing plan. The Packet Pg. 100 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 9 plan components may be contained within several documents. Table 2 in Section C is a Self-Certification Eligibility Worksheet with instructions to determine whether an existing plan meets the eligibility requirements. Supplemental action plan activities could include, but are not limited to: a second round of analysis; expanded data collection and evaluation using integrated data; testing action plan concepts before project and strategy implementation; feasibility studies using quick-build strategies that inform permanent projects in the future (e.g., paint, plastic bollards, etc.); follow-up stakeholder engagement and collaboration; targeted equity assessments; progress report development; and complementary planning efforts such as speed management plans, accessibility and transition plans, racial and health equity plans, and lighting management plans. Additional information on supplemental action plan activities is located at https://www.transportation.gov/SS4A.
Applicants that have an existing plan that is substantially similar to and meets the eligibility requirements of an Action Plan may alternatively choose to fund supplemental Action Plan activities through an application for an Implementation Grant rather than an Action Plan Grant. See Section A.2.ii below.
ii. Implementation Grants
Implementation Grants fund projects and strategies identified in an Action Plan that address roadway safety problems. Implementation Grants may also fund associated planning and design and supplemental Action Plan activities in support of an existing Action Plan. DOT encourages Implementation Grant applicants to include supplemental Action Plan activities in their application to further improve and update existing plans. Applicants must have an existing Action Plan to apply for Implementation Grants or have an existing plan that is substantially similar and meets the eligibility requirements of an Action Plan. If applicants do not have an existing Action Plan, they should apply for Action Plan Grants and NOT Implementation Grants. The plan components may be contained within several documents. Table 2 in Section C is a Self-Certification Eligibility Worksheet with instructions to determine eligibility to apply for an Implementation Grant. Additional information on eligibility requirements and eligible activities is in Section C below.
3. SS4A Grant Priorities
This section discusses priorities specific to SS4A and those related to the Department’s overall mission, which are reflected in the selection criteria and NOFO requirements. Successful grant applications will demonstrate engagement with a variety of public and private stakeholders and seek to adopt innovative technologies and strategies to:
• Promote safety;
• Employ low-cost, high-impact strategies that can improve safety over a wider geographic area;
• Ensure equitable investment in the safety needs of underserved communities, which includes both underserved urban and rural communities;
• Incorporate evidence-based projects and strategies; and • Align with the Department’s mission and with priorities such as equity, climate and sustainability, quality job creation, and economic strength and global competitiveness.
The Department seeks to award Action Plan Grants based on safety impact, equity, and other safety considerations. For Implementation Grants, DOT seeks to make awards to projects and strategies that Packet Pg. 101 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 10 save lives and reduce roadway fatalities and serious injuries; incorporate equity, engagement, and collaboration into how projects and strategies are executed; use effective practices and strategies; consider climate change, sustainability, and economic competitiveness in project and strategy implementation; and will be able to complete the full scope of funded projects and strategies within five years after the establishment of a grant agreement. Section D provides more information on the specific measures an application should demonstrate to support these goals.
The SS4A grant program aligns with both Departmental and Biden-Harris Administration activities and priorities. The National Roadway Safety Strategy (NRSS, issued January 27, 2022) commits the Department to respond to the current crisis in roadway fatalities by “taking substantial, comprehensive action to significantly reduce serious and fatal injuries on the Nation’s roadways,” in pursuit of the goal of achieving zero roadway deaths. 9 DOT recognizes that zero is the only acceptable number of deaths on our roads, and achieving that is our long-term safety goal. The outcomes that are anticipated from the SS4A program also support the FY 2022-2026 DOT Strategic Plan and the accompanying safety performance goals such as a medium-term goal of a two-thirds reduction in roadway fatalities by 2040.10 As part of the NRSS, the Department adopted the Safe System Approach as a guiding principle to advance roadway safety. The Safe System Approach addresses the safety of all road users. It involves a paradigm shift to improve safety culture, increase collaboration across all safety stakeholders, and refocus transportation system design and operation on anticipating human mistakes and lessening impact forces to reduce crash severity and save lives. For more information on the Safe System Approach, see the NRSS.
DOT encourages communities to adopt and implement Complete Streets policies that prioritize the safety of all users in transportation network planning, design, construction, and operations.11 A full transition to a Complete Streets design model requires leadership, identification and elimination of barriers, and development of new policies, rules, and procedures to prioritize safety. A Complete Street includes, but is not limited to: sidewalks, curb ramps, bike lanes (or wide paved shoulders), special bus lanes, accessible public transportation stops, safe and accommodating crossing options, median islands, pedestrian signals, curb extensions, narrower travel lanes, and roundabouts.12 Recipients of Federal financial assistance are required to ensure the accessibility of pedestrian facilities in the public right-ofway. See Section F.2 of this NOFO for program requirements.
The NOFO aligns with and considers Departmental policy priorities that have a nexus to roadway safety and grant funding. As part of the Department’s implementation of Executive Order 14008, Tackling the Climate Crisis at Home and Abroad (86 FR 7619), the Department seeks to fund applications that, to the extent possible, target at least 40 percent of benefits towards low-income and underserved communities. DOT also seeks to award funds under the SS4A grant program that proactively address equity and barriers to opportunity, or redress prior inequities and barriers to opportunity. DOT supports the policies in Executive Order 13985, Advancing Racial Equity and Support for Underserved Communities Through the Federal Government (86 FR 7009), to pursue a comprehensive approach to advancing equity for all, including people of color, rural communities, and others who have been historically underserved, marginalized, and adversely affected by persistent poverty and inequality. An important area for DOT’s focus is the disproportionate, adverse safety impacts that affect certain groups 9 https://www.transportation.gov/NRSS
10 https://www.transportation.gov/dot-strategic-plan 11 Complete Streets are defined in the Definitions table at the beginning of the document. 12 More information on Complete Streets can be found at https://highways.dot.gov/complete-streets Packet Pg. 102 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 11 on our roadways, particularly people walking and biking in underserved communities. See Section F.2.i of this NOFO for equity-related program requirements.
As part of the United States’ commitment to a whole-of-government approach to reaching net-zero emissions economy-wide by 2050 and a 50–52 percent reduction in emissions from 2005 levels by 2030, BIL and its associated transportation funding programs permit historic investments to improve the resilience of transportation infrastructure, helping States and communities prepare for hazards such as wildfires, floods, storms, and droughts exacerbated by climate change. DOT’s goal is to encourage the advancement of projects and strategies that address climate change and sustainability. To enable this, the Department encourages applicants to consider climate change and sustainability throughout the planning and project development process, including the extent to which projects and strategies under the SS4A grant program align with the President’s greenhouse gas reduction, climate resilience, and environmental justice commitments.
The Department intends to use the SS4A grant program to support the creation of good-paying jobs with the free and fair choice to join a union, and the incorporation of strong labor standards and workforce programs, in particular registered apprenticeships, joint labor-management programs, or other high-quality workforce training programs, including high-quality pre-apprenticeships tied to registered apprenticeships, in project planning stages and program delivery. Grant applications that incorporate such considerations support a strong economy and labor market.
Consistent with the Department’s Rural Opportunities to Use Transportation for Economic Success (ROUTES) initiative, the Department seeks to award funding to rural applications that address disproportionately high fatality rates in rural communities. For applicants seeking to use innovative technologies and strategies, the Department’s Innovation Principles serve as a guide to ensure innovations reduce deaths and serious injuries while committing to the highest standards of safety across technologies. 13
B. Federal Award Information
1. Total Funding Available
The BIL established the SS4A program with $5,000,000,000 in advanced appropriations in Division J, including $1,000,000,000 for FY 2022. Therefore, this Notice makes available up to $1 billion for FY 2022 grants under the SS4A program. Refer to Section D for greater detail on additional funding considerations and Section D.5 for funding restrictions.
2. Availability of Funds
Grant funding obligation occurs when a selected applicant and DOT enter into a written grant agreement after the applicant has satisfied applicable administrative requirements. Unless authorized by DOT in writing after DOT’s announcement of FY 2022 SS4A grant awards, any costs incurred prior to DOT’s obligation of funds for activities (“pre-award costs”) are ineligible for reimbursement. All FY 2022 SS4A funds must be expended within five years after the grant agreement is executed and DOT obligates the funds.
3. Award Size and Anticipated Quantity
13 https://www.transportation.gov/priorities/innovation/us-dot-innovation-principles. Released January 6, 2022.
Packet Pg. 103 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 12 In FY 2022, DOT expects to award hundreds of Action Plan Grants, and up to one hundred Implementation Grants. The Department reserves the right to make more, or fewer, awards. DOT reserves the discretion to alter minimum and maximum award sizes upon receiving the full pool of applications and assessing the needs of the program in relation to the SS4A grant priorities in Section A.3.
i. Action Plan Grants
For Action Plan Grants, award amounts will be based on estimated costs, with an expected minimum of $200,000 for all applicants, an expected maximum of $1,000,000 for a political subdivision of a State or a federally recognized Tribal government, and an expected maximum of $5,000,000 for a metropolitan planning organization (MPO) or a joint application comprised of a multijurisdictional group of entities that is regional in scope (e.g., a multijurisdictional group of counties, a council of governments and cities within the same region, etc.). The Department will consider applications with funding requests under the expected minimum award amount. DOT reserves the right to make Action Grant awards less than the total amount requested by the applicant.
Joint applications that engage multiple jurisdictions in the same region are encouraged, in order to ensure collaboration across multiple jurisdictions and leverage the expertise of agencies with established financial relationships with DOT and knowledge of Federal grant administration requirements.
Applicants may propose development of a single Action Plan covering all jurisdictions, or several plans for individual jurisdictions, administered by the leading agency. ii. Implementation Plan Grants
For Implementation Grants, DOT expects the minimum award will be $5,000,000 and the maximum award will be $30,000,000 for political subdivisions of a State. For applicants who are federally recognized Tribal governments or applicants in rural areas, DOT expects the minimum award will be $3,000,000 and the maximum award will be $30,000,000. For an MPO or a joint application comprised of a multijurisdictional group of entities that is regional in scope, the expected maximum award will be $50,000,000. For the purposes of the SS4A grant program award size minimum, rural is defined as an area outside an Urbanized Area (UA) or located within a UA with a population of fewer than 200,000.14 DOT reserves the right to make Implementation Grant awards less than the total amount requested by the applicant.
4. Start Dates and Period of Performance
DOT expects to obligate SS4A award funding via a signed grant agreement between the Department and the recipient, as flexibly and expeditiously as possible, within 12 months after awards have been announced. Applicants who have never received Federal funding from DOT before are encouraged to partner with eligible applicants within the same region, such as an MPO, that have established financial relationships with DOT and knowledge of Federal grant administration requirements. While States are not eligible applicants and cannot be a co-applicant, eligible applicants are encouraged to separately partner with States and other entities experienced with administering Federal grants, outside of the SS4A grant award process, to ensure effective administration of a grant award. The expected period of 14 Current lists of Urbanized Areas are available on the U.S. Census Bureau website at http://www2.census.gov/geo/maps/dc10map/uauc_refmap/ua/. For the purposes of the SS4A program, Urbanized Areas with populations fewer than 200,000 will be considered rural.
Packet Pg. 104 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 13 performance for Action Plan Grant agreements is between 12 and 24 months. The period of performance for Implementation Grant agreements may not exceed five years.
Because award recipients under this program may be first-time recipients of Federal funding, DOT is committed to implementing the program as flexibly as permitted by statute and to providing assistance to help award recipients through the process of securing a grant agreement and delivering both Action Plan activities and Implementation Grant projects and strategies.
5. Data Collection Requirements
Under the BIL, the Department shall post on a publicly available website best practices and lessons learned for preventing roadway fatalities and serious injuries pursuant to strategies or interventions implemented under SS4A. Additionally, DOT shall evaluate and incorporate, as appropriate, the effectiveness of strategies and interventions implemented under the SS4A grant program.15 The Department intends to measure safety outcomes through a combination of grant agreement activities and data collections, DOT data collections already underway, and program evaluations separate from the individual grant agreements in accordance with Section F.3.iii. The grant data-collection requirements reflect the need to build evidence of noteworthy strategies and what works. The Department expects to use the data and outcome information collected as part of the SS4A in evaluations focused on before and after studies.
All award recipients shall submit a report that describes:
• The costs of each eligible project and strategy carried out using the grant; • The roadway safety outcomes and any additional benefits (e.g., increased walking, biking, or transit use without a commensurate increase in crashes, etc.) that each such project and strategy has generated, as—
o Identified in the grant application; and
o Measured by data, to the maximum extent practicable; and • The lessons learned and any recommendations relating to future projects or strategies to prevent death and serious injury on roads and streets.
All recipients must provide aggregated annual crash data on serious injuries and fatalities for the duration of the period of performance for the jurisdiction or jurisdictions for which funds were awarded.
These data will provide the information for metrics on changes in serious injuries and fatalities over time.
Implementation Grant recipients must also provide crash data on serious injury and fatalities in the locations where projects and strategies are implemented, which are expected to include crash characteristics and contributing factor information associated with the safety problems being addressed.
Data that measure outcomes for the specific safety problems addressed are required and could include, but are not limited to, aggregated information by road user, safety issue, and demographic characteristics such as race and gender. For Implementation Grants that undertake projects and strategies to foster applied research and experimentation to inform project and strategy effectiveness, additional data collection requirements will be negotiated with the applicant before a grant agreement is established.
Federally recognized Tribal governments receiving grants may request alternative data collection 15 BIL specifically cites Countermeasures That Work: A Highway Safety Countermeasure Guide for State Highway Safety Offices, Ninth Editionor any successor document, but DOT also is to consider applied research focused on infrastructure and operational projects and strategies.
Packet Pg. 105 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 14 requirements during grant agreement formulation, as appropriate. This information will be gathered on a quarterly basis in a Performance Progress Report (SF-PPR).16 To fulfill the data collection requirements and in accordance with the U.S. DOT Public Access Plan, award recipients must consider, budget for, and implement appropriate data management, for data and information outputs acquired or generated during the course of the grant.17, 18 Applicants are expected to account for data and performance reporting in their budget submission.
C. Eligibility Information
1. Eligible Applicants
Eligible applicants for SS4A grants are (1) a metropolitan planning organization (MPO); (2) a political subdivision of a State or territory; (3) a federally recognized Tribal government; and (4) a multijurisdictional group of entities described in any of the aforementioned three types of entities. A multijurisdictional group of entities described in (4) should identify a lead applicant as the primary point of contact. For the purposes of this NOFO, a political subdivision of a State under (2), above, is defined as a unit of government under the authority of State law. This includes cities, towns, counties, special districts, and similar units of local government. A transit district, authority, or public benefit corporation is eligible if it was created under State law, including transit authorities operated by political subdivisions of a State. States are not eligible applicants, but DOT encourages applicants to coordinate with State entities, as appropriate.
Eligible MPOs, transit agencies, and multijurisdictional groups of entities with a regional scope are encouraged to support subdivisions of a State such as cities, towns, and counties with smaller populations within their region. The Department strongly encourages such joint applications for Action Plan Grants, and for applicants who have never received Federal funding and can jointly apply with entities experienced executing DOT grants.
An eligible applicant for Implementation Grants must also meet at least one of these conditions: (1) have ownership and/or maintenance responsibilities over a roadway network; (2) have safety responsibilities that affect roadways; or (3) have agreement from the agency that has ownership and/or maintenance responsibilities for the roadway within the applicant’s jurisdiction. For the purposes of this NOFO, an applicant’s jurisdiction is defined as the U.S. Census tracts where the applicant operates or performs their safety responsibilities.
2. Cost Sharing or Matching
The Federal share of a SS4A grant may not exceed 80 percent of total eligible activity costs.
Recipients are required to contribute a local matching share of no less than 20 percent of eligible activity costs. All matching funds must be from non-Federal sources. In accordance with 2 CFR § 200.306, grant recipients may use in-kind or cash contributions toward local match requirements so long as those contributions meet the requirements under 2 CFR § 200.306(b). Matching funds may include funding from the applicant, or other SS4A-eligible non-Federal sources partnering with the applicant, which could include, but is not limited to, funds from the State. Any in-kind contributions used to fulfill the cost-share requirement for Action Plan and Implementation Grants must: be in accordance with the cost 16 https://www.sbir.gov/sites/default/files/SF%20PPR.pdf 17 https://doi.org/10.21949/1520559 18 United States. Department of Transportation. (2022)DOT Public Access[Home page]. https://doi.org/10.21949/1503647 Packet Pg. 106 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 15 principles in 2 CFR § 200 Subpart E; include documented evidence of completion within the period of performance; and support the execution of the eligible activities in Section C.4.
SS4A funds will reimburse recipients only after a grant agreement has been executed, allowable expenses are incurred, and valid requests for reimbursement are submitted. Grant agreements are expected to be administered on a reimbursement basis, and at the Department’s discretion alternative funding arrangements may be established on a case-by-case basis.
3. Grant Eligibility Requirements
If an applicant is eligible for both an Action Plan Grant and an Implementation Grant, the applicant may only apply for an Action Plan Grant or an Implementation Grant, not both. An eligible applicant may only submit one application to the funding opportunity. Action Plan Grant funding recipients are not precluded from applying for Implementation Grants in future funding rounds. i. Action Plan Grant Eligibility Requirements
The Action Plan Grant eligibility requirements are contingent on whether an applicant is requesting funds to develop or complete an Action Plan, or if the applicant is requesting funds for supplemental action plan activities. Applicants may not apply to develop or complete an Action Plan and fund supplemental action plan activities in the current round of funding. a) Eligibility Requirements to Develop or Complete an Action Plan Any applicant that meets the eligibility requirements may apply for an Action Plan Grant to develop or complete an Action Plan. Applicants with an existing Action Plan may also apply to develop a new Action Plan.
b) Eligibility Requirements for Supplemental Action Plan Activities Applicants for Action Plan Grants to fund supplemental action plan activities must either have an established Action Plan with all components described in Table 1 in Section A, or an existing plan that is substantially similar and meets the eligibility requirements. Table 2 below provides instructions to determine eligibility for applicants that have a substantially similar plan. The components required for an established plan to be substantially similar to an Action Plan may be found in multiple plans. State-level action plans (e.g., a Strategic Highway Safety Plan required in 23 U.S. Code (U.S.C.) § 148, State Highway Safety Plans required in 23 U.S.C. § 402, etc.) or Public Transportation Agency Safety Plans in 49 U.S.C. § 5329 cannot be used as an established plan. It is recommended that applicants include this eligibility worksheet as part of their narrative submission. If this Self-Certification Eligibility Worksheet is not used, applicants must describe how their established plan is substantially similar to an Action Plan as part of the Narrative, based on the criteria in Table 2 below.
Packet Pg. 107 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 16 Table 2: Self-Certification Eligibility Worksheet
Worksheet instructions: The purpose of the worksheet is to determine whether an applicant’s existing plan is substantially similar to an Action Plan, or not. For each question below, answer yes or no. For each yes, cite the specific page in your existing Action Plan or other plan/plans that corroborate your response, provide supporting documentation, or provide other evidence. Refer to Table 1 for further details on each component. Note: The term Action Plan is used in this worksheet; it covers either a stand-alone Action Plan or components of other plans that combined comprise an Action Plan.
Instructions to affirm eligibility: Based on the questions in this eligibility worksheet, an applicant is eligible to apply for an Action Plan Grant that funds supplemental action plan activities, or an Implementation Grant, if the following two conditions are met:
• Questions 3, 7, and 9 are answered “yes.” If Question 3, 7, or 9 is answered “no,” the plan is not substantially similar and ineligible to apply for Action Plan funds specifically for a supplemental action plan activity, nor an Implementation Grant. • At least four of the six remaining Questions are answered “yes” (Questions 1, 2, 4, 5, 6, or 8).
If both conditions are met, an applicant has a substantially similar plan.
Question Response, Document and Page Number
1. Are both of the following true:
• Did a high-ranking official and/or
governing body in the jurisdiction
publicly commit to an eventual goal of
zero roadway fatalities and serious
injuries?
• Did the commitment include either setting
a target date to reach zero, OR setting one
or more targets to achieve significant
declines in roadway fatalities and serious
injuries by a specific date?
2. To develop the Action Plan, was a committee,
task force, implementation group, or similar
body established and charged with the plan’s
development, implementation, and
monitoring?
Packet Pg. 108 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 17 Question Response, Document and
Page Number
3. Does the Action Plan include all of the
following? • Analysis of existing conditions and
historical trends to baseline the level of
crashes involving fatalities and serious
injuries across a jurisdiction, locality,
Tribe, or region;
• Analysis of the location(s) where there are
crashes, the severity, as well as
contributing factors and crash types;
• Analysis of systemic and specific safety
needs is also performed, as needed (e.g.,
high risk road features, specific safety
needs of relevant road users; and
• A geospatial identification (geographic or
locational data using maps) of higher risk
locations.
4. Did the Action Plan development include all
of the following activities? • Engagement with the public and relevant stakeholders, including the private sector
and community groups;
• Incorporation of information received
from the engagement and collaboration
into the plan; and
• Coordination that included inter- and
intra- governmental cooperation and
collaboration, as appropriate.
5. Did the Action Plan development include all
of the following? • Considerations of equity using inclusive and representative processes;
• The identification of underserved
communities through data; and
• Equity analysis, in collaboration with
appropriate partners, focused on initial
equity impact assessments of the
proposed projects and strategies, and
population characteristics.
Packet Pg. 109 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 18 Question Response, Document and
Page Number
6. Are both of the following true?
• The plan development included an
assessment of current policies, plans,
guidelines, and/or standards to
identify opportunities to improve how
processes prioritize safety; and
• The plan discusses implementation
through the adoption of revised or new
policies, guidelines, and/or standards.
7. Does the plan identify a comprehensive
set of projects and strategies to address the
safety problems identified in the Action
Plan, time ranges when the strategies and
projects will be deployed, and explain
project prioritization criteria?
8. Does the plan include all of the following?
• A description of how progress will be
measured over time that includes, at a
minimum, outcome data
• The plan is posted publicly online.
9. Was the plan finalized and/or last updated
between 2017 and 2022?
ii. Implementation Grant Eligibility Requirements
To apply for an Implementation Grant, the applicant must certify that they have an existing plan which is substantially similar to an Action Plan. The plan or plans should be uploaded as an attachment to your application. Use Table 2, Self-Certification Eligibility Worksheet, from the previous section to determine eligibility. The existing plan must be focused, at least in part, on the roadway network within the applicant’s jurisdiction. The components required for an existing plan to be substantially similar to an Action Plan may be found in multiple plans. State-level action plans (e.g., a Strategic Highway Safety Plan required in 23 U.S.C. § 148, State Highway Safety Plans required in 23 U.S.C. § 402, Commercial Vehicle Safety Plans required in 49 U.S.C. § 31102, etc.) as well as Public Transportation Agency Safety Plans in 49 U.S.C. § 5329 cannot be used as an established plan to apply for an Implementation Grant.
Packet Pg. 110 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 19 4. Eligible Activities and Costs
i. Eligible Activities
Broadly, eligible activity costs must comply with the cost principles set forth in with 2 CFR, Subpart E (i.e., 2 CFR § 200.403 and § 200.405). DOT reserves the right to make cost eligibility determinations on a case-by-case basis. Eligible activities for grant funding include the following three elements:
• (A) developing a comprehensive safety action plan or Action Plan (i.e., the activities outlined in Section A.2.i in Table 1 and the list of supplemental Action Plan activities); • (B) conducting planning, design, and development activities for projects and strategies identified in an Action Plan; and
• (C) carrying out projects and strategies identified in an Action Plan.
For Action Plan Grants, eligible activities and costs only include those that directly assist in the development of the Action Plan, element (A), and/or supplemental action plan activities in support of an existing Action Plan or plans.
For Implementation Grants, activities must include element (C) “carrying out projects and strategies identified in an Action Plan,” and may include element (B) “conducting planning, design, and development activities for projects and strategies identified in an Action Plan” and/or element (A) “supplemental action plan activities in support of an existing Action Plan.” Projects and strategies identified in element (C) must be either infrastructure, behavioral, or operational activities identified in the Action Plan, and must be directly related to addressing the safety problem(s) identified in the application and Action Plan. Examples of eligible Implementation Grant activities are listed on the SS4A website located at www.transportation.gov/SS4A. The following activities are not eligible for element (C) “projects and strategies” funding:
• Projects and strategies whose primary purpose is not roadway safety. • Projects and strategies exclusively focused on non-roadway modes of transportation, including air, rail, marine, and pipeline. Roadway intersections with other modes of transportation (e.g., atgrade highway rail crossings, etc.) are eligible activities. • Capital projects to construct new roadways used for motor vehicles. New roadways exclusively for non-motorists is an eligible activity if the primary purpose is safety-related. • Infrastructure projects primarily intended to expand capacity to improve Levels of Service for motorists on an existing roadway, such as the creation of additional lanes. • Maintenance activities for an existing roadway primarily to maintain a state of good repair.
However, roadway modifications on an existing roadway in support of specific safety-related projects identified in an Action Plan are eligible activities. • Development or implementation of a public transportation agency safety plan (PTASP) required by 49 U.S.C. § 5329. However, a PTASP that identifies and addresses risks to pedestrians, bicyclists, personal conveyance and micromobility users, transit riders, and others may inform Action Plan development.
Packet Pg. 111 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 20 All projects and strategies must have equity—the consistent, fair, just, and impartial treatment of all people—at their foundation. This includes traffic enforcement strategies. As part of the Safe System Approach adopted in the USDOT’s National Roadway Safety Strategy, any activities related to compliance or enforcement efforts to make our roads safer should affirmatively improve equity outcomes as part of a comprehensive approach to achieve zero roadway fatalities and serious injuries. The SS4A program can be used to support safety projects and strategies that address serious safety violations of drivers (e.g., speeding, alcohol and drug-impaired driving, etc.), so long as the proposed strategies are data-driven and demonstrate a process in alignment with goals around community policing and in accordance with Federal civil rights laws and regulations. 19 Funds may not be used, either directly or indirectly, to support or oppose union organizing. ii. Project and Strategy Location
For Implementation Grants, applications must identify the problems to be addressed, the relevant geographic locations, and the projects and strategies they plan to implement, based on their Action Plan or established plan. This should include specific intervention types to the extent practicable. To provide flexibility in the implementation of projects and strategies that involve systemic safety strategies or bundling of similar countermeasures, an applicant may wait to specify specific site locations and designs for the projects and strategies as part of executing the grant agreement, if necessary, upon approval of the Department and so long as the identified site locations and designs remain consistent with the intent of the award.
D. Application and Submission Information
1. Address to Request Application Package
All grant application materials can be accessed at grants.gov. Applicants must submit their applications via grants.gov under the Notice of Funding Opportunity Number cited herein. Potential applicants may also request paper copies of materials at:
Telephone: (202)-366-4114
Mail: U.S. Department of Transportation
1200 New Jersey Avenue SE
W84-322
Washington, DC 20590
2. Content and Form of Application Submission
The Action Plan Grant and Implementation Grant have different application submission and supporting document requirements.
i. Action Plan Grant Application Submissions
All Action Plan Grant applications must submit the following Standard Forms (SFs):
• Application for Federal Assistance (SF-424)
• Budget Information for Non-Construction Programs (SF-424A) 19 For one such example see https://cops.usdoj.gov/RIC/Publications/cops-p157-pub.pdf.
Packet Pg. 112 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 21 • Assurances for Non-Construction Programs (SF-424B) • Disclosure of Lobbying Activities (SF-LLL)
In addition to the SFs above, the applicant must provide: a) Key Information; b) Narrative; c) SelfCertification Eligibility Worksheet, if applying for action plan supplemental activities; d) Map; and e) Budget. While it is not required to conform to the recommended templates below, it is strongly encouraged to provide the information using the specific structure provided in this NOFO. a) Key Information Table
Lead Applicant
If Multijurisdictional, additional eligible
entities jointly applying
Total jurisdiction population
Count of motor-vehicle-involved roadway
fatalities from 2016 to 2020
Fatality rate per 100,000 persons
Action Plan Type New Action Plan
Complete Action Plan
Supplemental Planning Activities
Population in Underserved Communities
States(s) in which projects and strategies are
located
Costs by State (if project spans more than one
State)
Instructions for a):
• The lead applicant is the primary jurisdiction, and the lead eligible entity applying for the grant. • If the application is multijurisdictional, list additional eligible entities within the multijurisdictional group of entities. If a single applicant, mark as not applicable. • Total jurisdiction population is based on 2020 2019 U.S. Census American Community Survey (ACS) data and includes the total population of all Census tracts where the applicant operates or performs their safety responsibilities. 20
20 https://www.census.gov/acs/www/data/data-tables-and-tools/data-profiles/2019/ Packet Pg. 113 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 22 • The count of roadway fatalities from 2016 to 2020 in the jurisdiction based on DOT’s Fatality Analysis Reporting System (FARS) data, an alternative traffic fatality dataset, or a comparable data set with roadway fatality information.21 This should be a number. Cite the source, if using a dataset different from FARS, with a link to the data if publicly available. • The fatality rate, calculated using the a 5-year annual average from the total count of fatalities from 2016 to 2020 based on FARS data, an alternative traffic fatality dataset, or a comparable data set with roadway fatality information, which is divided by the population of the applicant’s jurisdiction based on 2020 2019 U.S. Census ACS population data. The rate should be normalized to per 100,000 persons.
• Check one of the three available boxes to the right of the column with the three Action Plan types:
new Action Plan; Action Plan completion; or supplemental action plan activities. • The population in underserved communities should be a percentage obtained by dividing the population living in Census tracts with an Underserved Community designation divided by the total population living in the jurisdiction. For multi-jurisdictional groups, provide this information in aggregate as well as for each jurisdiction in the group. The population must be based on 2019 ACS data.
• Note the State(s) of the applicants. If a federally recognized Tribal government, mark as not applicable.
• Allocate funding request amounts by State based on where the funds are expected to be spent. If the projects and strategies are located in only one State, put the full funding request amount. b) Narrative
In narrative form, the applicant should respond to the Action Plan Grant selection criteria described in Section E.1.i to affirm whether the applicant has considered certain activities that will enhance the implementation of an Action Plan once developed or updated. The narrative must be no longer than 300 words.
b) Self-Certification Eligibility Worksheet
If applying for Action Plan Grant funding supplemental action plan activities, attach the filled out Table 2 Self-Certification Eligibility Worksheet. If applying to develop or complete an Action Plan, do not include Table 2.
c) Map
The applicant must submit a map that shows the location of the jurisdiction and highlights the roadway network under the applicant’s jurisdiction. The permissible formats include: map web link (e.g., Google, Bing, etc.), PDF, image file, vector file, or shapefile. d) Budget
21 https://www.nhtsa.gov/research-data/fatality-analysis-reporting-system-fars. To query the FARS data see https://cdan.dot.gov/query. To query the FARS data see https://cdan.dot.gov/query. For the Census data visit https://www.census.gov/programs-surveys/decennial-census/about/rdo/summary-files.html Packet Pg. 114 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 23 Applicants are required to provide a brief budget summary and a high-level overview of estimated activity costs, as organized by all major cost elements. The budget only includes costs associated with the eligible activity (A) developing a comprehensive safety action plan and may include supplemental action plan activities. Funding sources should be grouped into two categories: SS4A Funding Federal share, and non-Federal share funds. The costs or value of in-kind matches should also be provided. This budget should not include any previously incurred expenses, or costs to be incurred before the time of award.
DOT requires applicants use SF-424A to provide this information. ii. Implementation Grant Application Submissions
Implementation Grant applications must submit the following Standard Forms (SFs):
• Application for Federal Assistance (SF-424)
• Budget Information for Construction Programs (SF-424C) • Assurances for Construction Programs (SF-424D)
• Disclosure of Lobbying Activities (SF-LLL)
In addition to the SFs above, the applicant must provide: a) Key Information; b) Narrative; c) SelfCertification Eligibility Worksheet; and d) Budget. While it is not required to conform to the recommended template in the Key Information Table below, it is strongly encouraged to provide the information using the specific structure provided in this NOFO. a) Key Information Table
Application Name
Lead Applicant
If Multijurisdictional, additional eligible entities
jointly applying
Roadway safety responsibility Ownership and/or maintenance responsibilities over a roadway network
Safety responsibilities that affect roadways
Have an agreement from the agency that has
ownership and/or maintenance responsibilities for
the roadway within the applicant’s jurisdiction
Population in Underserved Communities
Packet Pg. 115 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 24 Key Information Table
States(s) in which activities are located
Costs by State
Funds to Underserved Communities
Cost total for eligible activity (A) supplemental
action plan activities in support of an existing
Action Plan
Cost total for eligible activity (B) conducting
planning, design, and development activities for
projects and strategies identified in an Action Plan
Cost total for eligible activity (C) carrying out
projects and strategies identified in an Action Plan
Action Plan or Established Plan Link
Packet Pg. 116 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 25 Instructions for a)
• Provide a grant application name to accompany the grant application. • The lead applicant is the primary jurisdiction, and the lead eligible entity applying for the grant. • If the application is multijurisdictional, list additional eligible entities within the multijurisdictional group of entities. If a single applicant, leave blank.
• The roadway safety responsibility response should check one of the three answers to meet eligibility conditions.
• The population in Underserved Community Census Tracts should be a percentage number obtained by dividing the population living in Underserved Community Census tracts within the jurisdiction divided by the total population living in the jurisdiction. The population must be based on 2019 ACS data.22
• Identify State(s) in which the applicant is located in. If a federally recognized Tribal government, leave blank.
• The total amount of funds to underserved communities is the amount of spent in, and provide safety benefits to, locations in census tracts designated as underserved communities. • For each State, allocate funding request amounts divided up by State based on where the funds are expected to be spent. If the applicant is located in in only one State, put the full funding request amount only.
• Provide a weblink to the plan that serves as the Action Plan or established plan that is substantially similar. This may be attached as a supporting PDF document instead; if so please write “See Supporting Documents.”
b) Narrative
The Department recommends that the narrative follows the outline below to address the program requirements and assist evaluators in locating relevant information. The narrative may not exceed 10 pages in length, excluding cover pages and the table of contents. Key information, the Self-Certification Eligibility Worksheet, and Budget sections do not count towards the 10-page limit. Appendices may include documents supporting assertions or conclusions made in the 10-page narrative and also do not count towards the 10-page limit. If possible, website links to supporting documentation should be provided rather than copies of these supporting materials. If supporting documents are submitted, applicants should clearly identify within the narrative the relevance of each supporting document.
I. Overview See D.2.ii.b.I
II. Location See D.2.ii.b.II
III. Response to Selection Criteria See D.2.ii.b.III and Section E.1.ii IV. Project Readiness See D.2.ii.b.IV
22 Use https://usdot.maps.arcgis.com/apps/dashboards/99f9268777ff4218867ceedfabe58a3ato calculate the percentage of population in underserved community. Census data can be found at https://www.census.gov/acs/www/data/datatables-and-tools/data-profiles/2019/ Packet Pg. 117 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 26 I. Overview
This section should provide an introduction, describe the safety context, jurisdiction, and any highlevel background information that would be useful to understand the rest of the application.
II. Location
This section of the application should describe the jurisdiction’s location, the jurisdiction’s HighInjury Network or equivalent geospatial identification (geographic or locational data using maps) of higher risk locations, and potential locations and corridors of the projects and strategies. Note that the applicant is not required to provide exact locations for each project or strategy; rather, the application should identify which geographic locations are under consideration for projects and strategies to be implemented and what analysis will be used in a final determination.
III. Response to Selection Criteria
This section should respond to the criteria for evaluation and selection in Section E.1.ii of this Notice and include compelling narrative to highlight how the application aligns with criteria #1 Safety Impact; #2 Equity, Engagement, and Collaboration; #3 Effective Practices and Strategies; and #4 Climate Change and Sustainability, and Economic Competitiveness. Note, criterion #1 Safety Impact assesses “implementation cost” information, which will be described in SF-424C and the d) Budget of the narrative and does not need to be duplicated in this portion of the narrative.
The applicant must respond to each of the four criteria. Applicants are not required to follow a specific format, but the organization provided, which addresses each criterion separately, promotes a clear discussion that assists evaluators. To minimize redundant information in the application, the Department encourages applicants to cross-reference from this section of their application to relevant substantive information in other sections of the application. To the extent practical, DOT encourages applicants to use and reference existing content from their Action Plan/established plan(s) to demonstrate their comprehensive, evidence-based approach to improving safety.
IV. Project Readiness
The applicant must provide information to demonstrate the applicant’s ability to substantially execute and complete the full scope of work in the application proposal within five years of when the grant is executed, with a particular focus on design and construction, as well as environmental, permitting, and approval processes. Applicants should indicate if they will be seeking permission to use roadway design standards that are different from those generally applied by the State in which the project is located. As part of this portion of the narrative, the applicant must include a detailed activity schedule that identifies all major project and strategy milestones. Examples of such milestones include: State and local planning approvals; start and completion of National Environmental Policy Act and other Federal environmental reviews and approvals including permitting; design completion; right of way acquisition; approval of plans, specifications, and estimates; procurement; State and local approvals; public involvement; partnership and implementation agreements; and construction. Environmental review documentation should describe in detail known project impacts, and possible mitigation for those impacts. When a project results in impacts, it is expected an award recipient will take steps to engage the public. For additional guidance and resources, visit www.transportation.gov/SS4A. c) Self-Certification Eligibility Worksheet
Packet Pg. 118 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 27 Attach a completed Table 2: Self-Certification Eligibility Worksheet. d) Budget
This section of the application should describe the budget for the SS4A proposal. Applicants are required to provide a brief budget summary and provide a high-level overview of estimated activity costs, as organized by all major cost elements. The budget should provide itemized estimates of the costs of the proposed projects and strategies at the individual component level. This includes capital costs for infrastructure safety improvements and costs associated with behavioral and operational safety projects and strategies. The section should also distinguish between the three eligible activity areas: (A) supplementing action plan activities in support of an existing Action Plan; (B) conducting planning, design, and development activities for projects and strategies identified in an Action Plan; and (C) carrying out projects and strategies identified in an Action Plan.
Funding sources should be grouped into two categories: SS4A funding Federal share, and nonFederal share funds. Estimated costs or value of in-kind matches should also be provided. The budget should show how each source of funds will be spent. This budget should not include any previously incurred expenses, or costs to be incurred before the time of award and obligation because these expenses are not eligible for reimbursement or cost-sharing. If non-Federal share funds or in-kind contributions are from entities who are not the applicant, include commitment letters or evidence of allocated cost share as a supporting document. DOT requires applicants use form SF-424C, and the applicant must also provide the information in Table 3 below.
Table 3: Supplemental Estimated Budget
Subtotal Budget for (A) supplemental
action plan activities; $0.00
Itemized Estimated Costs of the (A) supplemental action plan activities Item #1 $0.00
Item #2 $0.00
Subtotal Budget for (B) conducting
planning, design, and development activities $0.00
Itemized Estimated Costs of the (B) planning, design, and development activities Item #1 $0.00
Item #2 $0.00
Item #3 $0.00
Subtotal Budget for (C) carrying out
projects and strategies $0.00
Packet Pg. 119 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 28 Itemized Estimated Costs of the (C) proposed projects and strategies Item #1
$0.00
Item #2
$0.00
Item #3
$0.00
Item #4
$0.00
Subtotal Funds to Underserved
Communities $0.00
3. Unique Entity Identifier and System for Award Management (SAM) Each applicant is required to: (i) be registered in SAM (https://sam.gov/content/home) before submitting its application; (ii) provide a valid unique entity identifier in its application; and (iii) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application or plan under consideration by a Federal awarding agency. DOT may not make a Federal award to an applicant until the applicant has complied with all applicable unique entity identifier and SAM requirements and, if an applicant has not fully complied with the requirements by the time DOT is ready to make an award, DOT may determine that the applicant is not qualified to receive an award and use that determination as a basis for making an award to another applicant.
4. Submission Dates and Times
Applications must be submitted by 5:00 PM EDT on Thursday, September 15, 2022.
5. Funding Restrictions
Per BIL requirements, not more than 15 percent of the funds made available to carry out the SS4A program in FY22 may be awarded to eligible applicants in a single State.23 In addition, 40 percent of the total FY22 funds made available must be for developing and updating a comprehensive safety action plan, or supplemental action plan activities.
6. Other Submission Requirements
The format of the Section D.2 application submission should be in PDF format, with font size no less than 12-point Times New Roman, margins a minimum of 1 inch on all sides, and include page numbers.
The complete application must be submitted via grants.gov. In the event of system problems or the applicant experiences technical difficulties, contact grants.gov technical support via telephone at 1-800- 518-4726 or email at [email protected].
23 Funding for Tribal lands will be treated as their own State and will not count toward a State’s 15% limit.
Packet Pg. 120 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 29 E. Application Review Information
1. Selection Criteria
This section specifies the criteria DOT will use to evaluate and select applications for SS4A grant awards. The Department will review merit criteria for all applications. Each of the two grant types to be made available through the SS4A grant program, Action Plan Grant and Implementation Grant, will have its own set of application review and selection criteria. i. Action Plan Grant Selection Criteria
For Action Plan Grants, the Department will use three evaluation criteria. The Department will evaluate quantitative data in two selection criteria areas: #1 Safety Impact; and #2 Equity. The Department will also assess the narrative for #3 Additional Safety Considerations. Costs will also be considered.
Selection Criterion #1: Safety Impact. The activities are in jurisdictions that will likely support a significant reduction or elimination of roadway fatalities and serious injuries involving various road users, including pedestrians, bicyclists, public transportation users, personal conveyance and micromobility users, motorists, and commercial operators, within the timeframe proposed by the applicant. The Department will assess safety impact using two quantitative ratings:
• The count of roadway fatalities from 2016 to 2020 based on DOT’s FARS data, an alternative traffic crash dataset, or a comparable data set with roadway fatality information. 24 • The fatality rate, which is calculating using the 5-year annual average from the total count of fatalities from 2016 to 2020 (based on FARS data or an alternative traffic crash dataset) divided by the 2020 2019 population of the applicant’s jurisdiction based on 2020 2019 ACS data U.S.
Census population data. The rate should be normalized to per 100,000 persons.
Selection Criterion #2: Equity. The activities will ensure equitable investment in the safety needs of underserved communities in preventing roadway fatalities and injuries, including rural communities. The Department will assess the equity criterion using one quantitative rating:
• The percentage of the population in the applicant’s jurisdiction that resides in an Underserved Community Census tract.25 Population of a Census tract, either a tract that is Underserved Community or not, must be based on 2020 2019 ACS data U.S. Census population data.
Selection Criterion #3: Additional Safety Considerations. The Department will assess whether the applicant has considered any of the following in the development of the Action Plan:
• Employ low-cost, high-impact strategies that can improve safety over a wider geographical area; • Engage with a variety of public and private stakeholders (e.g., inclusive community engagement, community benefit agreements, etc.);
• Seek to adopt innovative technologies or strategies to promote safety and equity; and 24 https://cdan.dot.gov/query 25 https://usdot.maps.arcgis.com/apps/dashboards/d6f90dfcc8b44525b04c7ce748a3674a https://usdot.maps.arcgis.com/apps/dashboards/99f9268777ff4218867ceedfabe58a3a Packet Pg. 121 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 30 • Include evidence-based projects or strategies.
The applicant must address these considerations in narrative form.
Additional Consideration: Budget Costs
The Department will assess the extent to which the budget and costs to perform the activities required to execute the Action Plan Grant are reasonable based on 2 CFR § 200.404. ii. Implementation Grant Selection Criteria
Implementation Grants have four merit criteria: #1 Safety Impact; #2 Equity, Engagement, and Collaboration; #3 Effective Practices and Strategies; and #4 Climate Change and Economic Competitiveness. Two additional considerations will also be used in the selection process: Project Readiness, and Funds to Underserved Communities. The response to each criterion, to the extent practicable, should be aligned with the applicant’s Action Plan. Below describes the specific content the applicant should respond to for each of these criteria.
Selection Criterion #1: Safety Impact. DOT will assess whether the proposal is likely to:
significantly reduce or eliminate roadway fatalities and serious injuries; employ low-cost, high-impact strategies over a wide geographic area; and include evidence-based projects and strategies. Safety impact is the most important criterion and will be weighed more heavily in the review and selection process. The Department will assess the applicant’s description of the safety problem, safety impact assessment, and costs as part of the Safety Impact criterion:
• Description of the safety problem. DOT will assess the extent to which:
o The safety problem is described, including historical trends, fatal and serious injury crash locations, contributing factors, and crash types by category of road user. o Crashes and/or crash risk are displayed in a High-Injury Network, hot spot analysis, or similar geospatial risk visualization.
o Safety risk is summarized from risk models, hazard analysis, the identification of high-risk roadway features, road safety audits/assessments, and/or other proactive safety analyses. • Safety impact assessment. DOT will assess the extent to which projects and strategies:
o Align with and address the identified safety problems. o Are supported by evidence to significantly reduce or eliminate roadway fatalities and serious injuries involving various road users, including pedestrians, bicyclists, public transportation users, personal conveyance and micromobility users, motorists, and commercial vehicle operators.
o Use low-cost, high-impact strategies and projects that can improve safety over a wider geographical area.
o Measure safety impact through models, studies, reports, proven noteworthy practices, Crash Modification Factors (CMF), and other information on project and strategy effectiveness. o Include a multi-disciplinary, systemic approach that relies on redundancies to reduce safety risks.
o Will have safety benefits that persist over time.
Packet Pg. 122 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 31 • Implementation Costs. DOT will assess the extent to which projects and strategies are itemized and summarized, including capital costs for infrastructure, behavioral, and operational safety improvements.
Selection Criterion #2: Equity, Engagement, and Collaboration. This criterion supports the legislative requirements to assess the extent to which the application ensures the equitable investment in the safety needs of underserved communities, and demonstrates engagement with a variety of public and private stakeholders. The response to this criterion should focus on equity, engagement, and collaboration in relation to the implementation of the projects and strategies. DOT will assess the extent to which projects and strategies:
• Ensure equitable investment in underserved communities in preventing roadway fatalities and serious injuries, including rural communities.
• Are designed to decrease existing disparities identified through equity analysis. • Consider key population groups (e.g., people in underserved communities, children, seniors, Black, Latino, Indigenous and Native Americans, Asian Americans and Pacific Islanders, other persons of color, persons with disabilities, persons who live in rural areas, and persons otherwise adversely affected by persistent poverty or inequality) to ensure the impact to these groups is understood and addressed.
• Include equity analysis, both quantitative and qualitative, and stakeholder engagement in underserved communities as part of the development and implementation process. • Include meaningful engagement with the public, including public involvement for underserved communities, community benefit agreements, and relevant stakeholders such as private sector and community groups, as part of implementation.
• Leverage partnerships within their jurisdiction, with other government entities, non-governmental organizations, the private sector, academic institutions, and/or other relevant stakeholders to achieve safety benefits while preventing unintended consequences for persons living in the jurisdiction.
• Inform representatives from areas impacted on implementation progress and meaningfully engage over time to evaluate the impact of projects and strategies on persons living in the jurisdiction. • Align with the equity analysis performed as part of the development of an existing Action Plan.
Selection Criterion #3: Effective Practices and Strategies. DOT will assess the extent to which the application employs low-cost, high-impact strategies that can improve safety over a wide geographical area, includes evidence-based projects or strategies that improve safety, and seeks to adopt innovative technologies or strategies to promote safety and equity. The response to this criterion needs to address, at a minimum, one of the four effective practices and strategies from the list below, which includes: create a safer community; Safe System Approach; Complete Streets; and innovative practices and technologies. If the applicant responds to more than one of the four options, the option that is rated highest in the review process will be used for the rating of this criterion.
• Create a safer community. DOT will assess the extent to which the projects and strategies:
o Establish basic, evidence-based roadway safety infrastructure features, including but not limited to sidewalks and separated bicycle lanes.
Packet Pg. 123 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 32 o Improve safety for all road users along a roadway network using proposed Public-Rights-ofWay Accessibility Guidelines (PROWAG). 26 o Use evidence-based, proven, and effective safety countermeasures to significantly improve existing roadways.27
o Use evidence-based Countermeasures that Work with four or five stars to address persistent behavioral safety issues and consider equity in their implementation.28 o Apply systemic safety practices that involve widely implemented improvements based on high-risk roadway features correlated with particular severe crash types. • Safe System Approach. DOT will assess the extent to which the projects and strategies:
o Encompass at least two of the five safety elements in the National Roadway Safety Strategy (Safer People, Safer Roads, Safer Speeds, Safer Vehicles, and Post-Crash Care). This may include a mix of infrastructure, behavioral, and operational safety projects and strategies. o Create a transportation system that accounts for and mitigates human mistakes. o Incorporate data-driven design features that are human-centric, limit kinetic energy, and are selected based on the physical limits of people’s crash tolerances before injury or death occurs.
o Support actions and activities identified in the Department’s National Roadway Safety Strategy that are evidence-based.
• Complete Streets. DOT will assess the extent to which the projects and strategies:
o Account for the safety of all road users in their implementation through evidence-based activities.
o Are supported by an existing Complete Streets Policy that prioritizes safety in standard agency procedures and guidance or other roadway safety policies that have eliminated barriers to prioritizing the safety of all users, or includes supplemental planning activities to achieve this. Consider the management of the right of way using a data-driven approach (e.g., delivery access, features that promote biking and micromobility, electric vehicle charging infrastructure, etc.).
o Improve accessibility and multimodal networks for people outside of a motor vehicle, including people who are walking, biking, rolling, public transit users, and have disabilities. o Incorporate the proposed PROWAG, and any actions in an established the American with Disabilities Act Transition Plan to correct barriers to individuals with disabilities. • Innovative practices and technologies. DOT will assess the extent to which the projects and strategies:
o Incorporate practices that promote efficiency within the planning and road management lifecycle (e.g., dig once, etc.).
o Integrate additional data beyond roadway and crash information to inform implementation and location, such as data on the built environment.
26 https://www.access-board.gov/prowag/ 27 https://safety.fhwa.dot.gov/provencountermeasures/ 28 https://www.nhtsa.gov/sites/nhtsa.gov/files/2021-09/Countermeasures-10th_080621_v5_tag.pdf Packet Pg. 124 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 33 o Foster applied, data-driven research and experimentation to inform project and strategy effectiveness, including but not limited to participation in a sanctioned Manual on Uniform Traffic Control Devices experimentation, research to inform Proven Safety Countermeasures or Countermeasures that Work, and/or research that measures the effectiveness of multidisciplinary activities.
o Adopt innovative technologies or practices to promote safety and equity. These could include infrastructure, behavioral, operational, or vehicular safety-focused approaches.
Selection Criterion #4: Climate Change and Sustainability, and Economic Competitiveness. This program's focus on equity and safety are also advanced by considerations of how applications address climate and sustainability considerations, as well as whether applications support economic competitiveness. DOT will assess the extent to which the projects and strategies use safety strategies to support the Departmental strategic goals of climate change and sustainability, and economic strength and global competitiveness, and the extent to which the proposal is expected to:
• Reduce motor vehicle-related pollution such as air pollution and greenhouse gas emissions. • Increase safety of lower-carbon travel modes such as transit and active transportation. • Incorporate lower-carbon pavement and construction materials. • Support fiscally responsible land use and transportation efficient design that reduces greenhouse gas emissions.
• Includes storm water management practices and incorporates other climate resilience measures or feature, including but not limited to nature-based solutions that improve built and/or natural environment while enhancing resilience.
• Lead to increased economic or business activity due to enhanced safety features for all road users. • Increase mobility and expand connectivity for all road users to jobs and business opportunities, including people in underserved communities.
• Improve multimodal transportation systems that incorporate affordable transportation options such as public transit and micromobility.
• Demonstrate a plan or credible planning activities and project delivery actions to advance quality jobs, workforce programs, including partnerships with labor unions, training providers, education institutions, and hiring policies that promote workforce inclusion. • Result in high-quality job creation by supporting good-paying jobs with a free and fair choice to join a union, incorporate strong labor standards (e.g., wages and benefits at or above prevailing; use of project labor agreements, registered apprenticeship programs, pre-apprenticeships tied to registered apprenticeships, etc.), and/or provide workforce opportunities for historically underrepresented groups (e.g., workforce development program, etc.).
Additional Consideration: Project Readiness
Applications rated as “Highly Recommended” or “Recommended” based on the selection Criteria 1 through 4 will be reviewed for Project Readiness, which will be a consideration for application selection.
Project Readiness focuses on the extent to which the applicant will be able to substantially execute and complete the full scope of work in the Implementation Grant application within five (5) years of when the grant is executed. This includes information related to required design and construction standards, as well Packet Pg. 125 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 34 as environmental, permitting, and approval processes. DOT will evaluate the extent to which the application:
• Documents all applicable local, State, and Federal requirements. • Includes information on activity schedule, required permits and approvals, the National Environmental Policy Act (NEPA) class of action and status, State Transportation Improvement Program (STIP) and Transportation Improvement Program (TIP) status, public involvement, right-of-way acquisition plans, procurement schedules, multi-party agreements, utility relocation plans and risk and mitigation strategies, as appropriate. • Is reasonably expected to begin any construction-related projects in a timely manner consistent with all applicable local, State, and Federal requirements.
Additional Consideration: Funds to Underserved Communities.
The percentage of Implementation Grant funds that will be spent in, and provide safety benefits to, locations in census tracts designated as underserved communities as defined by this NOFO will be considered as part of application selection.29 DOT will use this information in support of the legislative requirement to ensure equitable investment in the safety needs of underserved communities in preventing roadway fatalities and injuries. Higher percentages of funding to underserved communities will be generally viewed favorably by DOT, and the Department encourages applicants to leverage project and strategy activities to the extent practical and in alignment with the safety problems identified in an Action Plan.
2. Review and Selection Process
This section addresses the BIL requirement to describe the methodology for evaluation in the NOFO, including how applications will be rated according to selection criteria and considerations, and how those criteria and considerations will be used to assign an overall rating. The SS4A grant program review and selection process consists of eligibility reviews, merit criteria review, and Senior Review. The Secretary makes the final selections.
i. Action Plan Grant Review and Selection Process
The process for the application plan review is described below:
• Teams of Department and contractor support staff review all applications to determine eligibility based on the eligibility information in Section C.
• Eligible Action Plan applications received by the deadline will be reviewed for their merit based on the selection criteria in Section E.1.i.
• Applications are scored numerically based on Merit Criteria #1 Safety Impact and #2 Equity Criteria.
29 An underserved community as defined for this NOFO is consistent with the Office of Management and Budget’s Interim Guidance for the Justice40 Initiative and the Historically Disadvantaged Community designation, which includes: U.S. Census tracts identified in this table https://datahub.transportation.gov/stories/s/tsyd-k6ij; any Tribal land; or any territory or possession of the United States.
Packet Pg. 126 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 35 • The #3 Additional Safety Considerations criterion narrative will be reviewed and assessed as either “qualified,” meaning the application addresses the criterion at least in part, or “not qualified,” meaning the application does not address the criterion. Applications that do not address the #3 Additional Safety Considerations and are deemed “not qualified” will not be considered.
• Action Plan Grant applications to develop or complete a new Action Plan will be noted and prioritized for funding.
• In order to ensure that final selections will meet the statutory requirement that no more than 15 percent of program funds may be awarded to eligible applicants in one State, applications will have their State location denoted. Tribal awards are not counted towards this 15 percent maximum.
• The Teams will examine the locations of the applicants to identify if multiple applicants requested funding for the same jurisdiction. DOT reserves the right to request applicants with duplicative funding requests consolidate their efforts as one multijurisdictional group prior to receiving an award, and may decline to fund duplicative applications irrespective of their individual merits. ii. Implementation Grant Review and Selection Process
a) Overall Selection Process and Ratings
Teams of Department and contractor support staff review all applications to determine whether they are eligible applicants based on the eligibility information in Section C. All eligible Implementation Grant applications received by the deadline will be reviewed and receive ratings for each of these criteria:
#1 Safety Impact; #2 Equity, Engagement, and Collaboration; #3 Effective Practices and Strategies; #4 Climate Change and Sustainability, and Economic Competitiveness. Based on the criteria ratings, an overall application rating of “Highly Recommended,” “Recommended,” “Acceptable,” or “Not Recommended” will be assigned. Criterion #1, Safety Impact, will be weighted most heavily.
Overall “Highly Recommended” Application Rating Scenarios Selection Criteria
Scenario (a)
Criteria Rating
Scenario (b)
Criteria Rating
#1 Safety Impact High Medium
#2 Equity, Engagement, and
Collaboration Medium or High High
#3 Effective Practices and
Strategies
Medium or High High
#4 Climate Change
Sustainability, and Economic
Competitiveness
Low, Medium, or High High
Packet Pg. 127 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 36 Overall Rating Highly Recommended Highly Recommended Packet Pg. 128 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 37 Overall “Recommended” Rating Scenarios
Selection Criteria
Scenario (c)
Criteria Rating
Scenario (d) Criteria
Rating
#1 Safety Impact High Medium
#2 Equity, Engagement, and
Collaboration At least one Low One Medium and One High
or Two Medium
#3 Effective Practices and
Strategies At least one Low One Medium and One High
or Two Medium
#4 Climate Change and
Sustainability, and Economic
Competitiveness
Low, Medium, or High Low, Medium, or High
Overall Rating Recommended Recommended
Overall “Acceptable” and “Not Recommended” Rating Scenarios Selection Criteria
Scenario (e)
Criteria Rating
Scenario (f)
Criteria Rating
#1 Safety Impact Low Any are determined NonResponsive
#2 Equity, Engagement, and
Collaboration Low, Medium, or High
Any are determined NonResponsive
#3 Effective Practices and
Strategies Low, Medium, or High
Any are determined NonResponsive
#4 Climate Change and
Sustainability, and Economic
Competitiveness
Low, Medium, or High
Any are determined NonResponsive
Overall Rating Acceptable Not Recommended
b) Safety Impact Criterion Rating Methodology
For the #1 Safety Impact criterion, the Department will assess three subcomponents to determine a result in an overall rating of “high,” “medium,” and “low,” or “non-responsive.” The three subcomponents are: the description of the safety problem; the safety impact assessment; and the implementation costs.
Packet Pg. 129 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 38 The description of the safety problem sub-rating will use the guidelines below:
High Medium Low Non-responsive
Rating Scale
The narrative and
supporting
information
demonstrate the
proposal is
addressing a
substantial safety
problem. The
narrative is wellarticulated and is
strongly
supported by data
and analysis.
The narrative and
supporting
information
demonstrate the
proposal is
addressing an
existing safety
problem.
Narrative
articulates the
description, is
generally
supporting by
data and analysis.
The narrative and
supporting
information
demonstrate the
proposal is
addressing a
safety problem
more minor in
scope. The
narrative is not
well-articulated,
and the
supporting data
and analysis are
limited.
The narrative and
supporting
information do
not address a
safety problem.
The safety impact assessment sub-rating will use the guidelines below:
High Medium Low Non-responsive
Rating Scale
The projects and
strategies have
strong potential to
address the safety
problem. The
projects and
strategies
proposed are
highly effective,
based on
evidence, use a
systemic
approach, and
have benefits that
persist over time.
The projects and
strategies address
the safety
problem. Most of
the projects and
strategies
proposed are
effective
measures, based
on evidence, use a
systemic
approach, and
have benefits that
persist over time.
The projects and
strategies address
the safety
problem to a
limited degree.
Some or none of
the projects and
strategies
proposed are
effective
measures, based
on evidence, use a
systemic
approach, or have
benefits that
persist over time.
The projects and
strategies do not
address the safety
problem.
Packet Pg. 130 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 39 The implementation costs sub-rating will use the guidelines below:
High Medium Low Non-responsive
Rating Scale
The costs for the
implementation of
the projects and
strategies are
clearly articulated
and summarized.
Future costs are
well-described.
The quantity and
quality of the
projects and
strategies in
relation to the
cost amounts
strongly indicate
the costs are
reasonable.
The costs for the
implementation of
the projects and
strategies are
summarized.
Future costs are
described. The
quantity and
quality of the
projects and
strategies in
relation to the
cost amounts
seem to indicate
the costs are
reasonable.
The costs for the
implementation of
the projects and
strategies are not
well-articulated or
missing key
details. Future
costs are
minimally or not
described. Based
on the limited
quantity and/or
quality of the
projects and
strategies in
relation to the
cost amounts, the
cost
reasonableness is
uncertain.
Cost information
is not provided.
The three sub-ratings for the #1 Safety Criterion (the description of the safety problem; the safety impact assessment; and the implementation costs) will be combined and scored using the following rating system to determine if the overall rating for the Safety Criterion is “High,” “Medium,” “Low,” or “NonResponsive.” Safety Criterion Sub-Rating Scores Overall Safety Criterion Rating At least two “high”, no “low”,
no “non-responsive” High
No “low”, no “non-responsive,” or
does not meet the High criterion Medium
No “high”, at least one “low”, no “nonresponsive,” or does not meet the Medium criterion
Low
Any “non-responsive” Non-Responsive
c) Other Criteria Rating Methodology
For the merit criteria #2 Equity, Engagement, and Collaboration, #3 Effective Practices and Strategies, and #4 Climate Change and Economic Competitiveness, the Department will consider whether the application narrative is clear, direct, responsive to the selection criterion focus areas, and logical, which will result in a rating of “high, “medium,” “low,” or “non-responsive.” Packet Pg. 131 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 40 High Medium Low Non-Responsive
Rating
Scale
The application is
substantively
responsive to the
criteria, with clear,
direct, and logical
narrative.
The application is
moderately
responsive to the
criteria, with mostly
clear, direct, and
logical narrative.
The application is
minimally
responsive to the
criteria and is
somewhat addressed
in the narrative.
The narrative
indicates the
proposal is counter
to the criteria, or
does not contain
sufficient
information
“Highly Recommended” and “Recommended” applications will receive a Project Readiness evaluation, as described below. The reviewers will use the application materials outlined in Section D to assess the applicant’s Project Readiness and will provide a rating of either “Very Likely,” “Likely,” or “Unlikely.”
Very Likely Likely Unlikely
Rating
Scale
Based on the information
provided in the application
and the proposed scope of
the projects and strategies,
it is very likely the
applicant can complete all
projects and strategies
within a five-year time
horizon.
Based on the information
provided in the application
and the proposed scope of
the projects and strategies,
it is probable the applicant
can complete all projects
and strategies within a
five-year time horizon.
Based on the information
provided in the application
and the proposed scope of
the projects and strategies,
it is uncertain whether the
applicant can complete all
projects and strategies
within a five-year time
horizon.
iii. Senior Review Team Phase
a) Action Plan Grant Senior Review Team Phase
For the Action Plan Grants, the Secretary will set thresholds for each of the three quantitative criteria ratings based on their distribution, the number of applicants, and the availability of funds. Eligible applicants who meet or exceed the threshold in any of the three criteria will be offered Action Plan Grant award funding. A composite rating of the three criteria will not be made, and each criterion will be considered separately. Based on the overall application pool, available funding, and legislative requirements, the Secretary reserves the discretion to set the threshold(s) most advantageous to the U.S.
Government’s interest. The Secretary will consult with a Senior Review Team (SRT) to make the threshold determinations. Additionally, the Secretary may choose to prioritize Action Plan Grants that are developing or completing an Action Plan over Action Plan Grant applications focused on supplemental action plan activities because an Action Plan is a prerequisite to applying for Implementation Grants in future NOFOs.
b) Implementation Grant Senior Review Team Phase
Once every Implementation Grant application has been assigned an overall rating based on the methodology above, all “Highly Recommended” applications will be included in a list of Applications for Consideration. The SRT will review whether the list of “Highly Recommended” applications is sufficient to ensure that no more than 15 percent of the FY 2022 funds made available are awarded to eligible applicants in a single State. “Recommended” applications may be added to the proposed list of Applications for Consideration until a sufficient number of applications are on the list to ensure that all Packet Pg. 132 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 41 the legislative requirements can be met and funding would be fully awarded. “Recommended” applications with a “High” Safety Impact Criterion rating will be prioritized and considered first. If that produces an insufficient list, “Recommended” applications with a “Medium” Safety Impact Criterion rating and a “High” rating for the Equity, Engagement, and Collaboration Criterion will also be considered. The SRT will also review all “Highly Recommended” applications that received an “Unlikely” project readiness rating, and either remove those applicants from the Applications for Consideration, OR recommend a reduced scope to minimize the risk the applicant will not complete the scope of work within five years of the grant agreement execution.
Additionally, to ensure the funding awards align to the extent practicable to the program goal of equitable investment in the safety needs of underserved communities, the SRT may review “Recommended” applications and set a threshold based on the percentage of funds that will be spent in, and provide safety benefits to, locations within underserved communities. Any “Recommended” applications at or above that threshold will be included in the proposed list of Applications for Consideration.
For each grant type, the SRT will present the list of Applications for Consideration to the Secretary, either collectively or through a representative of the SRT. The SRT may advise the Secretary on any application on the list of Applications for Consideration, including options for reduced awards, and the Secretary makes final selections. The Secretary’s selections identify the applications that best address program requirements and are most worthy of funding.
3. Additional Information
Prior to entering into a grant agreement, each selected applicant will be subject to a risk assessment as required by 2 CFR § 200.206. The Department must review and consider any information about the applicant that is in the designated integrity and performance system accessible through SAM (currently the Federal Awardee Performance and Integrity Information System (FAPIIS)). An applicant may review information in FAPIIS and comment on any information about itself that a Federal awarding agency previously entered. The Department will consider comments by the applicant, in addition to the other information in FAPIIS, in making a judgment about the applicant's integrity, business ethics, and record of performance under Federal awards when completing the review of risk posed by applicants.
Because award recipients under this program may be first-time recipients of Federal funding, DOT is committed to implementing the program as flexibly as permitted by statute and to providing assistance to help award recipients through the process of securing a grant agreement and delivering both Action Plan activities and Implementation Grant projects and strategies. Award recipients are encouraged to identify any needs for assistance in delivering the Implementation Grant projects and strategies so that DOT can provide directly, or through a third party, sufficient support and technical assistance to mitigate potential execution risks.
Packet Pg. 133 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 42 F. Federal Award Administration Information
1. Federal Award Notices
Following the evaluation outlined in Section E, the Secretary will announce awarded applications by posting a list of selected recipients at www.transportation.gov/SS4A.The posting of the list of selected award recipients will not constitute an authorization to begin performance. Following the announcement, the Department will contact the point of contact listed in the SF-424 to initiate negotiation of a grant agreement.
2. Administrative and National Policy Requirements
i. Equity and Barriers to Opportunity
Each applicant selected for SS4A grant funding must demonstrate effort to improve equity and reduce barriers to opportunity as described in Section A. Award recipients that have not sufficiently addressed equity and barriers to opportunity in their planning, as determined by the Department, will be required to do so before receiving funds, consistent with Executive Order 13985, Advancing Racial Equity and Support for Underserved Communities Through the Federal Government (86 FR 7009).30 ii. Labor and Workforce
Each applicant selected for SS4A grant funding must demonstrate, to the full extent possible consistent with the law, an effort to create good-paying jobs with the free and fair choice to join a union and incorporation of high labor standards as described in Section A. To the extent that applicants have not sufficiently considered job quality and labor rights in their planning, as determined by the Department of Labor, the applicants will be required to do so before receiving funds, consistent with Executive Order 14025, Worker Organizing and Empowerment (86 FR 22829), and Executive Order 14052, Implementation of the Infrastructure Investment and Jobs Act (86 FR 64335).
As expressed in section A, equal employment opportunity is an important priority. The Department wants to ensure that sponsors have the support they need to meet requirements under EO 11246, Equal Employment Opportunity (30 FR 12319, and as amended). All Federally assisted contractors are required to make good faith efforts to meet the goals of 6.9 percent of construction project hours being performed by women and goals that vary based on geography for construction work hours and for work being performed by people of color.31 Projects over $35 million shall meet the requirements in Executive Order 14063, Use of Project Labor Agreements for Federal Construction Projects (87 FR 7363).
The U.S. Department of Labor’s Office of Federal Contract Compliance Programs (OFCCP) has a Mega Construction Project Program through which it engages with project sponsors as early as the design phase to help promote compliance with non-discrimination and affirmative action obligations. Through the program, OFCCP offers contractors and subcontractors extensive compliance assistance, conducts compliance evaluations, and helps to build partnerships between the project sponsor, prime contractor, subcontractors, and relevant stakeholders. OFCCP will identify projects that receive an award under this notice and are required to participate in OFCCP’s Mega Construction Project Program from a wide range of federally assisted projects over which OFCCP has jurisdiction and that have a project cost above 30 An illustrative example of how these requirements are applied to recipients can be found here:
https://cms.buildamerica.dot.gov/buildamerica/financing/infra-grants/infra-fy21-fhwa-general-terms-and-conditions 31 https://www.dol.gov/sites/dolgov/files/ofccp/ParticipationGoals.pdf Packet Pg. 134 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 43 $35 million. DOT will require project sponsors with costs above $35 million that receive awards under this funding opportunity to partner with OFCCP, if selected by OFCCP, as a condition of their DOT award. Under that partnership, OFCCP will ask these project sponsors to make clear to prime contractors in the pre-bid phase that project sponsor’s award terms will require their participation in the Mega Construction Project Program. Additional information on how OFCCP makes their selections for participation in the Mega Construction Project Program is outlined under “Scheduling” on the Department of Labor website: https://www.dol.gov/agencies/ofccp/faqs/construction-compliance. iii. Critical Infrastructure Security and Resilience
It is the policy of the United States to strengthen the security and resilience of its critical infrastructure against both physical and cyber threats. Each applicant selected for SS4A grant funding must demonstrate, prior to the signing of the grant agreement, effort to consider and address physical and cyber security risks relevant to the transportation mode and type and scale of the activities. Award recipients that have not appropriately considered and addressed physical and cyber security and resilience in their planning, design, and oversight, as determined by the Department and the Department of Homeland Security, will be required to do so before receiving Implementation Grant funds for construction, consistent with Presidential Policy Directive 21, Critical Infrastructure Security and Resilience and the National Security Presidential Memorandum on Improving Cybersecurity for Critical Infrastructure Control Systems. Additionally, funding recipients must be in compliance with 2 CFR § 200.216 and the prohibition on certain telecommunications and video surveillance services or equipment.
Award recipients shall also consider whether projects in floodplains are upgraded consistent with the Federal Flood Risk Management Standard, to the extent consistent with current law, in Executive Order 14030, Climate-Related Financial Risk (86 FR 27967), and Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input (80 FR 6425).
iv. National Environmental Policy Act of 1969 (NEPA)
Funding recipients must comply with NEPA under 42 U.S.C. § 4321 et seq. and the Council on Environmental Quality’s NEPA implementing regulations at 40 CFR §§ 1500-1508, where applicable. v. Other Administrative and Policy Requirements
All awards will be administered pursuant to the Uniform Administrative Requirements, Cost Principles and Audit Requirements for Federal Awards found in 2 CFR § 200, Subpart F, as adopted by the Department at 2 CFR § 1201. Additionally, as permitted under the requirements described above, applicable Federal laws, rules, and regulations of the relevant operating administration (e.g., the Federal Highway Administration, etc.) administering the activities will apply to the activities that receive SS4A grants, including planning requirements, Stakeholder Agreements, and other requirements under the Department’s other highway and transit grant programs. DOT anticipates grant recipients to have varying levels of experience administering Federal funding agreements and complying with Federal requirements, and DOT will take a risk-based approach to SS4A program grant agreement administration to ensure compliance with all applicable laws and regulations.
The Department will also provide additional technical assistance and support resources to first-time DOT funding recipients and those who request additional support, as appropriate. With respect to highway projects, except as otherwise noted in this NOFO, please note that these grants are not required Packet Pg. 135 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 44 to be administered under Title 23 of the U.S.C., which establishes requirements that are generally applicable to funding that is provided by formula to State departments of transportation32. Therefore, the administration and implementation of SS4A grants should be more streamlined for the entities that are eligible for SS4A awards.
As expressed in Executive Order 14005, Ensuring the Future Is Made in All of America by All of America’s Workers (86 FR 7475), it is the policy of the executive branch to maximize, consistent with law, the use of goods, products, and materials produced in, and services offered in, the United States.
Infrastructure projects are subject to the Build America, Buy America Act (Pub. L. No 117–58, div. G §§ 70901–70927) as clarified in OMB Memorandum M-22-11.33 The Department expects all recipients to be able to complete their projects without needing a waiver. However, to obtain a waiver, a recipient must be prepared to demonstrate how they will maximize the use of domestic goods, products, and materials in constructing their project. Projects under this notice will be subject to the domestic preference requirements at § 70914 of the Build America, Buy America Act, as implemented by OMB, and any awards will contain the award terms specific in M-22-11.
SS4A award recipients should demonstrate compliance with civil rights obligations and nondiscrimination laws, including Titles VI of the Civil Rights Act of 1964, the Americans with Disabilities Act (ADA), and Section 504 of the Rehabilitation Act, and accompanying regulations.
Recipients of Federal transportation funding will also be required to comply fully with regulations and guidance for the ADA, Title VI of the Civil Rights Act of 1964, Section 504 of the Rehabilitation Act of 1973, and all other civil rights requirements. Additionally, to the extent practicable, Implementation Grants must adhere to the proposed Public Rights-of-Way Accessibility Guidelines.34 The Department’s and the applicable Operating Administrations’ Offices of Civil Rights may will work with awarded grant recipients as appropriate to ensure full compliance with Federal civil rights requirements.
In connection with any program or activity conducted with or benefiting from funds awarded under this notice, recipients of funds must comply with all applicable requirements of Federal law, including, without limitation, the Constitution of the United States; the conditions of performance, nondiscrimination requirements, and other assurances made applicable to the award of funds in accordance with regulations of the Department of Transportation; and applicable Federal financial assistance and contracting principles promulgated by the Office of Management and Budget. In complying with these requirements, recipients, in particular, must ensure that no concession agreements are denied or other contracting decisions made on the basis of speech or other activities protected by the First Amendment. If the Department determines that a recipient has failed to comply with applicable Federal requirements, the Department may terminate the award of funds and disallow previously incurred costs, requiring the recipient to reimburse any expended award funds. 32 Please note that some title 23 requirements apply regardless of funding source. In particular, projects involving routes on the National Highway System must meet the applicable design standards at 23 CFR part 625. 33 Pub. L. No. 117-58, division. G, Title IX, Subtitle A, 135 Stat. 429, 1298 (2021). For additional information on § 70914, see OMB-22-11. https://www.whitehouse.gov/wp-content/uploads/2022/04/M-22-11.pdf 34 https://www.access-board.gov/prowag/ Packet Pg. 136 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 45 3. Reporting
i. Progress Reporting on Grant Activity
Reporting responsibilities include quarterly program performance reports using the Performance Progress Report (SF-PPR) and quarterly financial status using the SF-425 (also known as the Federal Financial Report or SF-FFR). 35
ii. Post Award Reporting Requirements/Reporting of Matters Related to Integrity and Performance
If the total value of a selected applicant’s currently active grants, cooperative agreements, and procurement contracts from all Federal awarding agencies exceeds $10,000,000 for any period of time during the period of performance of this Federal award, then the applicant during that period of time must maintain the currency of information reported in SAM that is made available in the designated integrity and performance system (currently the Federal Awardee Performance and Integrity Information System (FAPIIS)) about civil, criminal, or administrative proceedings described in paragraph 2 of this award term and condition. This is a statutory requirement under section 872 of Pub. L. No.110–417, as amended (41 U.S.C. § 2313). As required by section 3010 of Pub. L. No. 111–212, all information posted in the designated integrity and performance system on or after April 15, 2011, except past performance reviews required for Federal procurement contracts, will be publicly available. Additionally, if applicable funding recipients must be in compliance with the audit requirements in 2 CFR § 200, Subpart F. iii. Program Evaluation
As a condition of grant award, SS4A grant recipients may be required to participate in an evaluation undertaken by DOT, or another agency or partner. The evaluation may take different forms such as an implementation assessment across grant recipients, an impact and/or outcomes analysis of all or selected sites within or across grant recipients, or a benefit/cost analysis or assessment of return on investment.
The Department may require applicants to collect data elements to aid the evaluation. As a part of the evaluation, as a condition of award, grant recipients must agree to: (1) make records available to the evaluation contractor; (2) provide access to program records, and any other relevant documents to calculate costs and benefits; (3) in the case of an impact analysis, facilitate the access to relevant information as requested; and (4) follow evaluation procedures as specified by the evaluation contractor or DOT staff.
Recipients and sub-recipients are also encouraged to incorporate program evaluation including associated data collection activities from the outset of their program design and implementation to meaningfully document and measure the effectiveness of their projects and strategies. Title I of the Foundations for Evidence-Based Policymaking Act of 2018 (Evidence Act), Pub. L. No. 115–435 (2019) urges Federal awarding agencies and Federal assistance recipients and sub-recipients to use program evaluation as a critical tool to learn, to improve equitable delivery, and to elevate program service and delivery across the program lifecycle. Evaluation means “an assessment using systematic data collection and analysis of one or more programs, policies, and organizations intended to assess their effectiveness and efficiency” (codified at 5 U.S.C. § 311). For grant recipients, evaluation expenses are allowable costs (either as direct or indirect), unless prohibited by statute or regulation, and such expenses may include the personnel and equipment needed for data infrastructure and expertise in data analysis, performance, and evaluation (2 CFR §200).
35 https://www.grants.gov/forms/post-award-reporting-forms.html Packet Pg. 137 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 46 G. Federal Awarding Agency Contacts
For further information concerning this notice, please contact the Office of the Secretary via email at [email protected]. In addition, up to the application deadline, the Department will post answers to common questions and requests for clarifications on the Department’s website at www.transportation.gov/SS4A.
To ensure applicants receive accurate information about eligibility or the program, the applicant is encouraged to contact the Department directly, rather than through intermediaries or third parties, with questions. Department staff may also conduct briefings on the SS4A grant selection and award process upon request.
H. Other Information
1. Publication of Application Information
Following the completion of the selection process and announcement of awards, the Department intends to publish a list of all applications received along with the names of the applicant organizations.
The Department may share application information within the Department or with other Federal agencies if the Department determines that sharing is relevant to the respective program’s objectives.
2. Department Feedback on Applications
The Department will not review applications in advance, but Department staff are available for technical questions and assistance. The deadline to submit technical questions is August 15, 2022. The Department strives to provide as much information as possible to assist applicants with the application process. Unsuccessful applicants may request a debrief up to 90 days after the selected funding recipients are publicly announced on transportation.gov/SS4A. Program staff will address questions to [email protected] throughout the application period.
3. Rural Applicants
User-friendly information and resources regarding DOT’s discretionary grant programs relevant to rural applicants can be found on the Rural Opportunities to Use Transportation for Economic Success (ROUTES) website at www.transportation.gov/rural.
Packet Pg. 138 Attachment: Grant Guidelines (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
ACTION PLAN
ADOPTED AUGUST 14, 2018 Packet Pg. 139 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
ii
Photographs provided by the
City of Sacramento & Fehr & Peers
Design & Layout by Fehr & Peers
1001 K Street, 3rd Floor
Sacramento, CA 95814
ALL RIGHTS RESERVED
Copyright ©2017 Fehr & Peers
No portion of this report may be used
or reproduced without prior written
consent of the City of Sacramento.
Every three days, someone is killed or seriously injured on Sacramento’s streets. On January 19, 2017, the City Council issued a call to action by adopting a resolution with the following goal:
The City of Sacramento will work collaboratively
in a data-driven effort to eliminate traffic
fatalities and serious injuries by 2027.
To help reach this goal, the City developed this Action Plan. The Plan uses historic crash data to pinpoint the factors contributing to traffic deaths and serious injuries, and it identifies proven safety countermeasures to address those factors through education, engineering, enforcement, and evaluation.
Vision Zero is an international traffic safety philosophy that rejects the notion that traffic crashes are simply “accidents,” but instead preventable incidents that can and must be systematically addressed. Through Vision Zero, the City of Sacramento and its partners are committed to working together, supported by a comprehensive data-driven process, to create safer streets and bring the number of people killed or seriously injured down to zero.
Through Vision Zero, Sacramento approaches transportation safety differently – not only addressing spot improvements but taking a systematic and comprehensive approach to our transportation environment.
Tackling such a complex challenge requires reaching across multiple disciplines, working together to evaluate data differently, and investing financial and staff resources in transportation safety.
Packet Pg. 140 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
CONTENTS
LETTER FROM THE MAYOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v
A CALL TO ACTION
TO MAKE OUR STREETS SAFER. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 ABOUT VISION ZERO. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
VISION STATEMENT &
GUIDING PRINCIPLES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 VISION ZERO RESOLUTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 CRASH TRENDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
CRASH PROFILES &
COUNTERMEASURE TOOLBOX. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 ACTION PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 ACKNOWLEDGMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 RESOURCES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
SACRAMENTO VISION ZERO ACTION PLAN
iii
Packet Pg. 141 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
iv
VISION ZERO TASK FORCE
Reaching the Vision Zero goal requires a strategic planning effort to build community consensus and regional political support. As part of Sacramento’s Vision Zero initiative, a multidisciplinary task force was convened to incorporate the unique perspectives of a variety of stakeholders and guide the development of the Action Plan. Task Force members include local government agencies and partner organizations, such as:
AARP
City of Sacramento Fire Department
City of Sacramento Community
Development Department
City of Sacramento Police Department
City of Sacramento Public Works Department
Sacramento County Health and Human Services
California State Office of Traffic Safety
Resources for Independent Living
Sacramento Area Council of Governments (SACOG)
Sacramento Area Bicycle Advocates
Sacramento City/County Bicycle Advisory
Committee (SacBAC)
Sacramento City Unified School District
Sacramento Disabilities Advisory Commission
Sacramento Regional Transit
Society for the Blind
WALKSacramento
Packet Pg. 142 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Members of the Community:
I am pleased to present the City of Sacramento’s Vision Zero plan to eliminate all traffic fatalities and serious injuries by 2027. No fatality or serious injury is acceptable on our streets. Crashes are too often preventable incidents that can be addressed through engineering, enforcement, and education.
Making our transportation network safer for people to walk, bike, drive, or use their mobility devices to get where they need to go is at the core of what we do as stewards of City resources. Our City fabric is made stronger by increasing the connectivity of its residents.
The effort to achieve this goal will be comprehensive, collaborative, and equitable. The commitment we make with this plan -- and the projects we will undertake to implement it – will help to strengthen and revitalize our communities, and is part of the City’s overall effort to enhance opportunities for residents to live prosperous lives in healthy, sustainable, and safe communities.
This effort is not only data-driven, but also data-driving. Its recommendations are based on applying the best transportation planning principles available today to traffic safety data, and it will also help shape how our City gathers that data to make planning even smarter moving forward.
Achieving Vision Zero is critically important. I am grateful to the City Council for its leadership, and to staff for developing this comprehensive plan to make our communities safer and ultimately more vibrant.
Sincerely,
Darrell Steinberg
LETTER FROM THE MAYOR
SACRAMENTO VISION ZERO ACTION PLAN
v
Packet Pg. 143 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
1 80
80 5
80 84
80 160
5 5
50 80
99 50
Richards Blvd
H St
Exposition Blvd
Martin Luther K ni g Jr Blvd Del Paso Blvd
Broadway
N St
K St
Norwood Ave
Mack Rd
Riverside Blvd
W St
N B St
Greenhaven Dr
Meadowview Rd
Truxel Rd
65Th St Expy
44Th St
Mckinley Blv d
21St Ave
C St
N Market Blvd
Raley Blvd
Land Park Dr
Florin Rd
21St St
47Th Ave
14Th Ave
El Centro Rd
W El Camino Ave
San Juan Rd
W Elkhorn Blvd
Del Paso Rd
Rio Linda Blvd
AuburnBlvd
Stockton Blvd
Fruitridge Rd
Garden Hwy
J St
Northgate Blvd
Gloria Dr
Marysville Blvd
Pocket Rd
Va l ley H i Dr
Rus h River Dr
24Th St
Brucevil el Rd
Freeport Blvd
Florin Perkins Rd
S Watt Ave
Franklin Blvd
KSI Collisions
High Injury Network
COLLISIONS WITH SOMEONE KILLED OR SERIOUSLY INJURED, 2009-2015 Packet Pg. 144 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
2 A CALL TO ACTION
TO MAKE OUR STREETS SAFER
Between 2009 and 2015, 151 people
lost their lives on Sacramento’s streets.
Nearly half of those people were
killed while biking or walking. The list
of victims includes residents from all
corners of our City, and cuts across
all boundaries – geographically and
demographically. These deaths result in
tragic personal loss for family and friends
and significantly impact the Sacramento
community.
Fortunately, between 2009 and 2015,
we saw the annual number of crashes in
Sacramento decrease by 20%. But this
does not mean our safety work is done.
Over the same period of time, crashes
where someone was killed or seriously
injured increased by 6%. The increase
was even more pronounced (63%) for
people killed or seriously injured while
walking or riding a bicycle. It is time
for the City to take action to protect
everyone traveling on our streets,
including the most vulnerable users
of our roads.
People walking in Sacramento are
disproportionately impacted by
unsafe conditions on our streets.
Thirteen percent of all trips in
Sacramento are made on foot, but
40% of all fatal crashes in the City
involve a pedestrian.1
Traffic crash
victims who walk are 10 times more
likely to be killed or seriously injured
in Sacramento than crash victims
who drive.
COLLISIONS BY MODE, 2009-2015 Collisions
2400
2000
1600
1200
800
400
2009 2010 2011 2012 2013 2014 2015
Graph 1, Option 2: All collisions
Between 2009 and 2015,
collisions where someone
was killed or seriously
injured while biking or
walking increased 63%
Packet Pg. 145 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
3 SHARE OF VIC TIMS WHO WERE KILLED OR SERIOUSLY INJURED BY MODE
TRAVEL AND COLLISIONS BY MODE
KILLED OR SERIOUSLY INJURED
NOT KILLED OR SERIOUSLY INJURED
84%
3 % 13%
ALL
TRIPS
KSI
COLLISIONS
52%
16%
32%
2%
98% 91%
9%
Graph 3: Pedestrian
79%
21%
79%
12%
10%
ALL
COLLISIONS
50%
10%
40% FATAL
COLLISIONS
Packet Pg. 146 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) SACRAMENTO VISION ZERO ACTION PLAN 4
Crash victims who walk are 10 times more likely to be
killed or seriously injured in Sacramento than crash
victims who drive
Why Focus on Fatalities
and Serious Injuries?
The City of Sacramento 2035 General
Plan states that the City is “committed
to sustaining the health and safety of
its residents, labor force, and visitors
and recognizes their importance
in achieving the City’s vision as the
most livable city in the nation.” With
this pledge, the City recognizes its
commitment to promote a healthy
and safe environment, including
through responsible stewardship of the
transportation network. Accounting
for fatal and serious injury crashes in
Vision Zero analysis work acknowledges
the out sized impact of these crashes
and focuses the City’s efforts on
improvements with the greatest benefit
to help the City fulfill its commitments
on health and safety.
Serious injuries (also called severe
injuries by the California Highway Patrol)
resulting from a traffic crash can result
in a number of catastrophic impacts,
including permanent disability, lost
productivity and wages, and ongoing
healthcare costs. These injuries can
include:
2 » Broken or fractured bones » Dislocated or distorted limbs » Severe lacerations » Severe burns » Skull, spinal, chest or abdominal injuries
» Unconsciousness at or when
taken from the collision scene
Throughout the Plan, the acronym KSI is
used to denote crashes where someone
was killed or seriously injured.
Packet Pg. 147 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) SACRAMENTO VISION ZERO ACTION PLAN 5
Packet Pg. 148 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
ABOUT VISION ZERO
What is Vision Zero?
Vision Zero is a strategy to eliminate all traffic fatalities and serious injuries, while increasing safe, healthy, equitable mobility for all. Vision Zero is a significant departure from the status quo in two major ways:
1 Vision Zero acknowledges that traffic deaths and serious injuries are preventable, and it sets a goal of eliminating them in an established time frame with
clear, measurable strategies. Through widespread
campaigns like reducing drunk driving and increasing
recycling, history has shown that changing cultural
attitudes and ensuring political accountability lead
to increased success. It’s time to take this level of
intention and focus to the critical issue of traffic deaths. 2 Vision Zero is a multidisciplinary approach that brings together a diverse set of stakeholders to address the complex problem of traffic safety.
It acknowledges that there are many factors that
contribute to safe mobility – including roadway
design, speed, enforcement, behavior change,
technology, and policies – and sets clear strategies
to achieve the shared goal of zero fatalities and
serious injuries.
Vision Zero began in Sweden
in 1997, when the country’s Parliament
adopted a national transportation
policy that “the long-term goal of traffic
safety is that nobody shall be killed or
seriously injured as a consequence of
traffic accidents.” Since 2014, Vision Zero
has been building momentum in the
United States. Starting with New York,
Vision Zero policies have spread across
American cities, adopted in places
like Chicago, Seattle, San Francisco
and Los Angeles. As of March 2017, 27
U.S. cities have committed to Vision
Zero, according to the national Vision
Zero Network. Sacramento is joining a
global movement with a strong national
network to help cities share best practices
to improve roadway safety.
Early results are promising. In New York
City, 2016 had the fewest traffic fatalities
on record. Traffic deaths are down 30%
since 2013, just before the City launched
Vision Zero. The first three years of Vision
Zero is the safest three-year period in
New York City’s history. Closer to home,
Fremont, California has seen a 25%
reduction in major traffic crashes in the
first two years since adopting Vision Zero.
SACRAMENTO VISION ZERO ACTION PLAN
6 Packet Pg. 149 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) SACRAMENTO VISION ZERO ACTION PLAN 7
Why Vision Zero?
Sacramento has taken an ambitious step
in adopting its Vision Zero goal, signaling
that it is willing to do the hard work
necessary to eliminate traffic deaths
and serious injuries. Only by moving
beyond traditional transportation safety
practices with bold interventions can the
City solve one of its largest preventable
public health crises. Sacramento’s rate of
fatal and serious injury crashes continues
to rise, and the 2008 Sacramento County
Health Status Profile Report cites vehicle
crashes as the leading cause of death for
children aged 1 to 18.
6 The City of Sacramento is constantly
working to increase the availability
of safe and comfortable multi-modal
transportation choices for all residents,
helping meet its goals to reduce carbon
emissions, improve public health
through increased physical activity, and
improve quality of life for everyone. The
adoption of Vision Zero makes this a
primary focus for the City, prioritizing
safe travel for all modes over delivering
efficient vehicle throughput.
Packet Pg. 150 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
8 Speed Kills
A major component of Vision Zero is the
recognition that speed kills. Research
compiled by the U.S. Department
of Transportation National Highway
Traffic Safety Administration shows
that the likelihood of fatality is 5% for a
pedestrian struck by a vehicle traveling
at 20 miles per hour, but the likelihood
increases to 40% at 30 miles per hour
and to 100% at 50 miles per hour.7 By
just designing our streets differently, we
can lower the speeds at which vehicles
travel to help reduce the severity
of injuries. Street design changes,
combined with public education and
targeted enforcement efforts, have the
potential to greatly reduce the number
people seriously injured or killed on
Sacramento’s streets.
Unsafe speed is the leading cause of crashes. 2/3 of fatal crashes occur on streets with a posted speed of 40+ mph, which account for just 10% of the City’s street network
HIT BY A VEHICLE
TRAVELING AT:
20 MPH
HIT BY A VEHICLE
TRAVELING AT:
HIT BY A VEHICLE
TRAVELING AT:
5% 40% 100%
Likelihood
of a Fatality
Likelihood
of a Fatality
Likelihood
of a Fatality
POSTED SPEED OF ROADWAY AND SEVERITY OF COLLISIONS
30 MPH
50 MPH
Packet Pg. 151 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) SACRAMENTO VISION ZERO ACTION PLAN 9
Packet Pg. 152 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
10 VISION STATEMENT &
GUIDING PRINCIPLES
The Vision Zero Task Force met in late 2016 to develop a vision statement and guiding principles to frame the development and implementation of the Vision Zero Action Plan. These principles form the foundation on which the City will conduct its Vision Zero work.
Guiding Principles
1 Safety of human life is our highest
priority.
2 Traffic deaths and serious injuries
are preventable, a public health
issue, unacceptable, and must
be addressed.
3 Actions towards Vision Zero will be
a comprehensive, collaborative,
and equitable approach through
engineering, education and culture
change, and traffic enforcement.
4 Actions towards Vision Zero will
be data-driven based on available
crash data.
5 Evaluation will be ongoing,
measuring performance against the
Vision Zero Action Plan objectives.
Vision Zero Sacramento is a collaborative and data-driven effort to eliminate traffic fatalities and serious injuries by 2027 Vision Statement
Traffic safety impacts our community,
neighborhoods, health, and
Sacramento’s livability. No level of
fatality or serious injury is acceptable
on our streets because crashes are
preventable incidents that can be
addressed through engineering,
education, and enforcement.
Packet Pg. 153 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
11 Equity
All Sacramentans deserve safe streets.
Traffic deaths and severe injuries
disproportionally burden Sacramento’s
Disadvantaged Communities.
Disadvantaged Communities are
defined by the State of California as
the neighborhoods in Sacramento that
are most burdened by pollution and
other negative environmental factors,
public health concerns, and a lack of
equitable economic opportunity.8
These
communities have experienced historic
underinvestment in safe roadway
projects throughout the state and now
receive preference for various types
of State and Regional transportation
grants.
Forty-four percent of fatal crashes and
half of pedestrian KSI crashes occur in
the City’s Disadvantaged Communities,
which account for only 25% of the
roadway network.
The Vision Zero Task Force and City staff
recognize the importance of creating
equitable safety solutions through
the implementation of Vision Zero.
The data-driven Vision Zero process
compels the City to align roadway safety
improvements with the areas hardest
hit by traffic violence – often the most
under served areas of Sacramento. In
redefining its enforcement activities,
the City will also work to ensure that
the disproportionate burden on
communities of color in traffic policing
does not persist.
44%
of fatal crashes and half of
pedestrian KSI crashes occur
in the City’s Disadvantaged
Communities, which account
for only 25% of the roadway
network
Packet Pg. 154 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
12 Vision Zero Aligns with
Sacramento’s Plans and
Policies
The goals of Vision Zero align well with
recently adopted plans and policies
that guide the development of the
transportation network in Sacramento.
Plans such as the Bicycle Master Plan
and Grid 3.0 emphasize improving safety
and closing key gaps in the bicycle and
pedestrian networks.
The Mobility Element of Sacramento’s
2035 General Plan, which was adopted
in March of 2015, overlaps with the
goals and strategies of Vision Zero. The
General Plan seeks to improve multimodal choices and multi-modal access within the City by removing barriers
for accessibility and creating complete
streets that are safe and comfortable
for travel by all modes. The General Plan
also emphasizes the importance of safe
connections to transit, a bicycle network
that is accessible for all residents, and
safe pedestrian crossings and sidewalks
throughout the City.
Packet Pg. 155 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
13 Packet Pg. 156 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
14 VISION ZERO RESOLUTION
On January 19, 2017, the Sacramento City Council voted unanimously on a resolution to adopt a Vision Zero goal.
Background
A. Traffic safety impacts our community, neighborhoods, health and Sacramento’s livability.
B. During the five-year period from 2010-2014, 130 people died in traffic crashes in Sacramento (26 deaths per year) including 48 pedestrians and 13 bicyclists.
C. Over the six-year period from 2008-2013, in the category of over-all traffic safety, when compared to cities with a population greater than 250,000, the City of Sacramento ranked 1 of 13 in 2008, 2009, 2010, and 2011, 3 of 13 in 2012, and 6 of 14 in 2013.
D. Vision Zero provides a framework for reducing traffic deaths and serious injuries through a comprehensive
approach.
E. On March 15, 2016, Council passed Motion No. 2016-
0074 directing the City Manager to 1) develop a Vision
Zero Action Plan toward eliminating traffic deaths in
Sacramento; and 2) establish a Vision Zero Task Force
to assist in developing and implementing the Vision
Zero Action Plan.
F. In October 2016, the City of Sacramento embarked
on its Vision Zero Action Plan and formed a Vision
Zero Task Force.
Based on the Facts Set Forth in the
Background, the City Council Resolves
as Follows:
Section 1. City of Sacramento recognizes that safety of human life is our highest priority and that traffic deaths and serious injuries are preventable, a public health issue, and must be addressed.
Section 2. No fatality or serious injury is acceptable on our streets because crashes are preventable incidents
that can be addressed through engineering, enforcement
and education.
Section 3. Vision Zero Sacramento is a collaborative and data-driven effort to eliminate traffic fatalities and serious injuries by 2027.
Section 4. Actions towards Vision Zero will be a
comprehensive, collaborative, and equitable approach through engineering, education and culture change, and traffic
enforcement.
Section 5. Actions towards Vision Zero will be data driven based on available crash data.
Section 6. Evaluation of reaching the goal to eliminate traffic fatalities and serious injuries by 2027 will be ongoing, measuring performance against the Vision Zero Action
Plan objectives.
Section 7. The City adopts the following goal related to Vision Zero: The City of Sacramento will work collaboratively in a data-driven effort to eliminate traffic fatalities and serious injuries by 2027.
Packet Pg. 157 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
15 HIGH INJURY NETWORK
80 80
5 80
84 80
160
5 5
50 80
99 50
Richards Blvd
H St
Exposition Blvd
Martin Luther K ni g Jr Blvd Del Paso Blvd
Broadway
N St
K St
Norwood Ave
Mack Rd
Riverside Blvd
W St
N B St
Greenhaven Dr
Meadowview Rd
Truxel Rd
65Th St Expy
44Th St
Mckinley Blv d
21St Ave
C St
N Market Blvd
Raley Blvd
Land Park Dr
Florin Rd
21St St
47Th Ave
14Th Ave
El Centro Rd
W El Camino Ave
San Juan Rd
W Elkhorn Blvd
Del Paso Rd
Rio Linda Blvd
AuburnBlvd
Stockton Blvd
Fruitridge Rd
Garden Hwy
J St
Northgate Blvd
Gloria Dr
Marysville Blvd
Pocket Rd
Va l ley H i Dr
Rus h River Dr
24Th St
Brucevil el Rd
Freeport Blvd
Florin Perkins Rd
S Watt Ave
Franklin Blvd
High Injury Network
Packet Pg. 158 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
16 CRASH TRENDS
Study Methodology
Vision Zero is a data-driven process.
In developing the Action Plan, the
City analyzed all crashes that occurred
on City streets resulting in fatality or
any level of injury for the years 2009
through 2015.9 Prior Vision Zero work
has shown that roadway characteristics,
such as number of lanes, posted speed
limit, and intersection control types, are
very important in helping to identify
historic collision trends and help cities
be proactive in identifying high-risk
locations. Vision Zero work has also
highlighted the disproportionate
burden traffic crashes have on
vulnerable populations, such as
seniors and Disadvantaged
Communities. The City of Sacramento
incorporated roadway characteristic
and demographic datasets into its
collision analysis to understand how
these patterns play out locally.
High Injury Network
The City developed a High Injury
Network (HIN), which identifies the
corridors with the highest levels of
fatal and serious crashes for pedestrians,
bicyclists, and motorists. There are 1,610
total roadway miles in Sacramento,
but KSI crashes do not occur on the
majority of those roads. By developing
the HIN, the City is able to focus safety
improvements on priority corridors
where the most serious crashes happen
with the most frequency.
Sacramento’s High Injury Network
accounts for 79% of all crashes and 77%
of KSI crashes, which occur on just 14%
(225 miles) of Sacramento’s roadway
network. Eighty-three of the City’s
elementary, middle, and high schools
fall along the HIN. Thirty-five percent
of the HIN falls within Disadvantaged
Communities.
of all crashes occur on the
High Injury Network, which
accounts for just 14% of
Sacramento’s roadways
79%
Packet Pg. 159 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) All
13%
KSI
15%
KSI
Vehicle
9%
KSI
Bike
21%
KSI
Pedestrian
21%
SACRAMENTO VISION ZERO ACTION PLAN
17 Crash Statistics
SHARE OF COLLISIONS THAT OCCURRED AT INTERSECTIONS
SHARE OF COLLISIONS THAT WERE HIT AND RUN
78%
Occur at
Intersections
Packet Pg. 160 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Crossing Outside of Crosswalk
Crossing In Crosswalk
Other
SACRAMENTO VISION ZERO ACTION PLAN
18 49%
30%
21%
ALL PED
COLLISIONS
28% 27%
KSI PED
COLLISIONS
45%
SHARE OF COLLISIONS BY TIME OF DAY
PEDESTRIAN LOCATION AT TIME OF COLLISION
5%
10%
15%
20%
25%
30%
35%
mid-3 am 3-6 am 6-9 am 9 am-noon noon-3 pm 3-6 pm 6-9 pm 9 pm-mid All KSI KSI Vehicle KSI Bike KSI Pedestrian
5%
10%
15%
20%
25%
30%
35%
mid-3 am 3-6 am 6-9 am 9 am-noon noon-3 pm 3-6 pm 6-9 pm 9 pm-mid All KSI KSI Vehicle KSI Bike KSI Pedestrian
Packet Pg. 161 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
19 Packet Pg. 162 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
CRASH PROFILES &
COUNTERMEASURE TOOLBOX
Unsafe Speed on
Non-Local Streets
Alcohol
Involved
35+
35+ MPH
Streets
30+
30+ MPH Streets -
Bicycle Involved
Broadside Crashes -
Bicycle Involved
Y
Driver Making Left
Or Right Turn - Bicycle/
Pedestrian Involved
Crashes in
Commercial Areas
60+ Year
Old Pedestrians
Pedestrian Crossing
Outside of an Intersection
or Crosswalk
Pedestrian Crashes
Near Transit Stops
Top 10 profiles
The City developed crash profiles
to highlight 10 of the top trends among
KSI crashes. The crash profiles are
based on an analysis of crash data and
related environmental factors. Every
profile highlights a crash pattern the
City has identified as a priority concern.
The profiles are paired with safety
countermeasures most relevant for the
crash and location context. Together,
these engineering, education, and
enforcement countermeasures make up
a toolbox of safety interventions the City
will utilize to implement projects tailored
to unique safety issues.
The following pages are set up with
the 10 profiles and countermeasures. We
have ranked the countermeasures by
Efficacy, Cost, Complexity and given
each of those ratings a score:
HIGH:
MEDIUM:
LOW:
UNKNOWN
20 SACRAMENTO VISION ZERO ACTION PLAN
Efficacy: The anticipated level of safety
benefit, based on academic research
and indsutry standards.
Cost: The magnitude of cost to design
and implement the countermeasure.
Complexity: The level of complexity
anticipated for the City to implement
the countermeasure.
Packet Pg. 163 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
21 PROFILE 1:
UNSAFE SPEED ON NON-LOCAL STREETS
COUNTERMEASURES
STREET NARROWING
Several countermeasures fall within the Intersection Narrowing toolkit, including curb extensions (bulbouts), lane narrowing and visual narrowing. Curb extensions are raised devices, usually constructed from concrete and/or landscaping, that reduce the corner radius or narrow the roadway in order to reduce speeds of turning vehicles, improve sight lines, and shorten crossing distances. In addition to physically narrowing intersection or lane widths, visual narrowing techniques can help to slow speeds and increase driver attentiveness. Visual narrowing techniques include adding street trees, vertical lighting elements, street furniture, special paving treatments, or roadway markings.
EFFICACY:12
COST:
COMPLEXITY:
ROAD DIETS
Reduction in number of travel lanes,
often paired with a center turning lane.
Road diets can allow for additional space
for other uses, including for pedestrians,
bike lanes and parking.
EFFICACY:
COST:
COMPLEXITY:
SIGNAL SYNC, SLOW GREEN WAVE
Signals can be synchronized to give a
progressive green band for cars traveling
at a specified speed, resulting in vehicles
traveling faster than the specified speed
having to stop more frequently.
EFFICACY:
COST:
COMPLEXITY:
FACTORS
Primary collision factor was
“unsafe speed”
Crash occurred on an arterial
or collector street
MODES
STATS
77 KSI CRASHES
» Accounts for 10% of all KSI
crashes and 17% of vehicle
KSI crashes
The primary collision factor in a crash
is the factor which “best describes
the primary or main cause of the
collision,” according to the reporting
officer.10 When the primary collision
factor is cited as “unsafe speed,” it
means that someone involved in the
crash was driving “at a speed greater
than is reasonable or prudent” for
the conditions.11 By slowing vehicles
down, we can increase the time
drivers have to react to potentially
dangerous situations and we can
reduce the severity of injuries by
lessening the impact of a crash. The
following countermeasures outline
potential options for redesigning our
roads to discourage unsafe speeds
and enforce the speed limits that are
in place.
Automated speed detection devices can identify speeding violations and provide citations. California is currently considering legislation to allow this type of enforcement and the City of Sacramento plans to support this effort.
Automated Speed Enforcement
Packet Pg. 164 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
22 MAP 1:
UNSAFE SPEED ON NON-LOCAL STREETS
Packet Pg. 165 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
23 ENFORCEMENT, MORE OFFICERS
Increase the number of traffic officers to the recommended national standard.
Focus enforcement efforts on most dangerous behaviors identified in this Vision Zero Action Plan.
EFFICACY:
COST:
COMPLEXITY:
EDUCATION, PUBLIC SERVICE
ANNOUNCEMENTS
Create public educational campaigns
or public service announcements to
inform the public on roadway safety.
EFFICACY:
COST:
COMPLEXITY:
TARGETED PROMOTIONAL
CAMPAIGNS
(Designated Drivers, Rideshare, Transit)
Create promotional campaigns to
encourage the use of designated
drivers, rideshare services, and transit
as an alternative to driving under
the influence. The campaigns should
include working with restaurants and
bar owners to help promote driver-forhire and transit services.
EFFICACY:
COST: HIGH
COMPLEXITY:
COUNTERMEASURES
FACTORS
Reporting officer cited that the
crash involved someone drinking
MODES
STATS
186
KSI CRASHES
» Accounts for 25% of all KSI
crashes and 31% of pedestrian
KSI crashes
In one-quarter of Sacramento’s severe
crashes, someone involved had been
drinking. In order to combat this major
public safety issue, a combination of
education and enforcement will be
necessary. National reports on this
topic, such as those published by
the Centers for Disease Control and
Prevention, point to the effectiveness
of mass media campaigns, sobriety
checkpoints and stricter drunk driving
laws.13
PROFILE 2:
ALCOHOL INVOLVED
Vision Zero Campaign
Packet Pg. 166 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
24 MAP 2:
ALCOHOL INVOLVED
Packet Pg. 167 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
25 PROFILE 3:
35+ MPH STREETS
COUNTERMEASURES
SPEED FEEDBACK SIGN
Radar signs that display the speed limit
as well as the speed of the approaching
vehicle in real-time, and in some cases
have changeable message display
boards.
EFFICACY:
COST:
COMPLEXITY:
REDUCED SPEED SCHOOL ZONE
State legislation (AB 321) allows for
speed limit reductions to 15 or 20 mph
near schools in environments that meet
certain conditions. All other streets are
subject to speed-limit setting based on
existing travel speeds, and therefore
can only be reduced if vehicles start
traveling more slowly.
EFFICACY:
COST:
COMPLEXITY:
STREET NARROWING
Several countermeasures fall within the Intersection Narrowing toolkit, including curb extensions (bulbouts), lane narrowing and visual narrowing. Curb extensions are raised devices, usually constructed from concrete and/or landscaping, that reduce the corner radius or narrow the roadway in order to reduce speeds of turning vehicles, improve sight lines, and shorten crossing distances. In addition to physically narrowing intersection or lane widths, visual narrowing techniques can help to slow speeds and increase driver attentiveness. Visual narrowing techniques include adding street trees, vertical lighting elements, street furniture, special paving treatments, or roadway markings.
EFFICACY:
COST:
COMPLEXITY:
The majority of serious collisions in
Sacramento occur on streets with
posted speeds of 35 mph or higher.
Given that these streets account for
only a small portion of the City’s
roadway network, we know that these
streets have an outsized impact of
the safety of Sacramento residents.
By implementing countermeasures
that slow vehicles down, we can
increase the time drivers have to react
to potentially dangerous situations,
reduce the severity of injuries, and
increase visibility of more vulnerable
road users.
FACTORS
Crash occurred on street with
posted speed of 35+ mph
MODES
STATS
480
KSI CRASHES
» Accounts for 65% of all
KSI crashes
Packet Pg. 168 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
26 MAP 3:
35 + MPH STREETS
Packet Pg. 169 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
27 PROFILE 4:
30+ MPH STREETS - BICYCLE INVOLVED
COUNTERMEASURES
BUFFERED BIKE LANES
A buffered bike lane is comprised of
a painted buffer between a Class II
bicycle lane and the vehicles lanes,
intended to reduce motor vehicle
encroachment into the bike lane and
increase bicyclist comfort and safety.
EFFICACY:
COST:
COMPLEXITY:
FACTORS
Crash Occurred on street with
posted speed of 30+ mph
MODES
STATS
100
KSI CRASHES
» Accounts for 85% of bicycle
KSI crashes
SEPARATED BIKEWAYS
(cycle tracks)
Bikeways, separated from vehicle traffic
by a physical barrier, usually bollards,
landscaping, parked cars, or through
elevated separation.
EFFICACY:
COST:
COMPLEXITY:
The 2016 Sacramento Bicycle Master
Plan Facility Selection Guidelines call
for separate bicycle facilities to be
implemented on streets with a posted
speed of 30 mph or higher. At 30
mph, bike lanes are recommended. At
faster speeds, buffered bike lanes and
separated bikeways are recommended.
Our data analysis found that severe
crashes occurred on streets both with
and without bicycle facilities. However,
state guidance shows that providing
dedicated space for bicyclists can
increase safety.
WARNING & REGULATORY SIGNS FOR MOTORISTS
(“bikes may use full lane,” “no parking in bike lane”)
Posted signs that provide warning and regulatory messages alerting motorists to the presence of bicyclists and shared roadway facilities.
EFFICACY:
COST:
COMPLEXITY:
Separated Bikeway
Packet Pg. 170 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
28 MAP 4:
30 + MPH STREETS - BICYCLE INVOLVED
Packet Pg. 171 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
29 BICYCLE SIGNAL PHASE
Restricts conflicting vehicular
movements to provide a signal phase,
using a bicycle signal head, for bicyclists
crossing an intersection where there are
bike lanes
EFFICACY:
COST:
COMPLEXITY:
NEW TRAFFIC SIGNALS
Traffic signal installed at previously
unsignalized intersection, when
warranted due to traffic volumes.
EFFICACY:
COST:
COMPLEXITY:
PROFILE 5:
BROADSIDE CRASHES - BICYCLE INVOLVED
COUNTERMEASURES
FACTORS
Collision type was
reported is “broadside”
» Broadside definition: One motor
vehicle strikes another vehicle (or
bicycle) at an angle greater than
that of a sideswipe (at or near 90
degrees). Commonly known as a
“T-Bone” collision.
MODES
STATS
51 KSI CRASHES
» Accounts for 44% of
bicycle KSI crashes
» 41% of these crashes
occurred at signalized
intersections
EDUCATION & ENFORCEMENT
Develop education and enforcement campaigns targeted at decreasing broadside crashes.
Education
EFFICACY:
COST:
COMPLEXITY:
Enforcement
EFFICACY:
COST:
COMPLEXITY:
Bicycle Signal
Packet Pg. 172 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
30 MAP 5:
BROADSIDE CRASHES - BICYCLE INVOLVED
Packet Pg. 173 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
31 LEADING PEDESTRIAN/
BICYCLE INTERVAL
Traffic signals timed to allow pedestrians
and bicyclists a short head start in
crossing the intersection to minimize
conflicts with turning vehicles.
EFFICACY:
COST:
COMPLEXITY:
PARKING RESTRICTIONS
NEAR INTERSECTIONS
(nearside locations)
Parking spaces removed near crossing
locations to allow for improved
sight lines for both pedestrians and
motorists. Also called “daylighting.” This
countermeasure is aligned with the
California Manual of Uniform Traffic
Control Devices (MUTCD), which calls for
near-side parking to be located no closer
than 20 feet from intersections and 30
feet from signalized intersections.
EFFICACY:
COST:
COMPLEXITY:
PROFILE 6:
DRIVER MAKING LEFT OR RIGHT TURN - BICYCLE/
COUNTERMEASURES
The countermeasures listed here are aimed at increasing visibility at intersections, and reducing the number of potential conflict points between vehicles and people walking or biking by providing dedicated turn phases at signals.
FACTORS
Y
The driver’s movement preceding
the crash was a left turn or a right
turn
MODES
STATS
58 KSI CRASHES
(33 left turns and 25 right turns)
» Accounts for 22% of bicycle
KSI crashes and 14% of
pedestrian KSI crashes
PROTECTED LEFT TURNS (turn pockets and signal phasing)
Protected left-turn phasing provides an exclusive phase for left-turning vehicles to enter the intersection separate from any conflicting vehicle or pedestrian movements. Permissive/protected left-turn phasing provides the exclusive left-turn phase in addition to a phase permitting left turns simultaneously with conflicting through movements. This countermeasure will be implemented in locations with demonstrated left-turn KSI collisions.
EFFICACY:
COST:
COMPLEXITY:
PEDESTRIAN INVOLVED
Packet Pg. 174 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
32 MAP 6:
DRIVER MAKING LEFT OR RIGHT TURN - BICYCLE/
PEDESTRIAN INVOLVED
Packet Pg. 175 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
33 PROFILE 7:
CRASHES IN COMMERCIAL AREAS
STRATEGY
While these crashes all occurred in commercial areas, the context of these areas varies quite a bit. Countermeasures that work on smaller streets with neighborhood-serving retail may not be appropriate near shopping centers on wide arterial streets. The City will prioritize the location of these collisions for further study and countermeasure pairing. Given the high public visibility of commercial areas, these locations will be prioritized for targeted education and enforcement campaigns.
FACTORS
Crash occurred within 500 feet
of a retail or recreation-focused
commercial land use
MODES
STATS
200
KSI CRASHES
» Accounts for 47% of bicycle
KSI crashes and 62% of
pedestrian KSI crashes
Packet Pg. 176 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
34 MAP 7:
CRASHES IN COMMERCIAL AREAS
Packet Pg. 177 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
35 RAISED CROSSWALKS, SPEED TABLES
Pedestrian crossings that are elevated to the level of the sidewalk, with ramps on each vehicle approach.
EFFICACY:
COST:
COMPLEXITY:
COUNTERMEASURES
EXTEND PEDESTRIAN CROSSING
TIME, PEDESTRIAN DETECTION
Extending pedestrian crossing intervals
helps people who may need additional
time crossing the street. In addition,
the City may install sensors that detect
when pedestrians are present in a
crossing and automatically increase
crossing time when necessary.
EFFICACY:
COST:
COMPLEXITY:
PEDESTRIAN REFUGE ISLANDS/
MEDIANS
Curbed sections in the center of the
roadway that are physically separated
from vehicular traffic. Raised medians
or refuge islands shorten crossing
distances across large, multi-lane
roadways.
EFFICACY:
COST:
COMPLEXITY:
FACTORS
60+Age of crash victim
MODES
STATS
70 KSI CRASHES
» Accounts for 30% of
pedestrian KSI crashes
PROFILE 8:
60+ YEAR OLD PEDESTRIANS
Pedestrian Refuge Island
Packet Pg. 178 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
36 MAP 8:
60 + YEAR OLD PEDESTRIANS
Packet Pg. 179 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
37 PROFILE 9:
PEDESTRIAN CROSSING OUTSIDE OF
AN INTERSECTION OR CROSSWALK
HIGH VISIBILITY CROSSWALKS WITH
ADVANCE STOP OR YIELD LINES
Distinct pavement markings, such as a
continental, zebra or ladder pattern, or
a reflective inlay or thermoplastic tape.
EFFICACY:
COST:
COMPLEXITY:
FLASHING BEACON
Pedestrian-activated flashing beacons
highlighting crosswalks and pedestrian
crossing signs. Flashing beacons provide
a high-visibility, bright strobe-like
flashing frequency.
EFFICACY:
COST:
COMPLEXITY:
PEDESTRIAN HYBRID BEACON
Pedestrian-activated warning light located on a mast arm over a pedestrian crossing.
The beacon stays dark until activated. It has one yellow lens and two red lenses to indicate to drivers that a pedestrian is in the crosswalk.
EFFICACY:
COST:
COMPLEXITY:
FACTORS
Pedestrian action was reported
as “crossing not in crosswalk”
Crash occurred more than
100 feet from an intersection
MODES
STATS
53 KSI CRASHES
» Accounts for 22% of pedestrian
KSI crashes
COUNTERMEASURES
The City of Sacramento adopted
Pedestrian Crossing Guidelines
in October 2014 to guide the
implementation of marked crosswalks
and enhanced pedestrian crossing
treatments.
As part of the City’s Vision Zero effort,
there is an opportunity to update the
Pedestrian Crossing Guidelines and
similar guidance documents to better
reflect countermeasures that address
the collision trends outlined in
this section.
Pedestrian Hybrid Beacon
Packet Pg. 180 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
38 MAP 9:
PEDESTRIAN CROSSING OUTSIDE OF
AN INTERSECTION OR CROSSWALK
Packet Pg. 181 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
39 COUNTERMEASURES
PEDESTRIAN WARNING SIGNS
Signs such as “Yield Here to Pedestrians”
or “Stop Here for Pedestrians” that can
be placed at the roadway surface level
in advance of the crosswalk, on posts, or
overhead.
EFFICACY:
COST:
COMPLEXITY:
BUS STOP SITING
(far side stops)
Bus stops are moved to the far side of
an intersection to decrease instances
in which riders must cross in front of
the bus and oncoming traffic after
disembarking. This siting strategy can
also improve transit system efficiency.
EFFICACY:
COST:
COMPLEXITY:
FACTORS
Crash occurred within 200 feet
of a light rail station or bus stop
MODES
STATS
128
KSI CRASHES
» Accounts for 54% of
pedestrian KSI crashes
FLASHING BEACON FOR
TRANSIT ACTIVITY/PEDESTRIAN GATES
Pedestrian gates and flashing beacons to warn pedestrians of approaching light rail vehicles.
EFFICACY:
COST:
COMPLEXITY:
PROFILE 10:
PEDESTRIAN CRASHES NEAR TRANSIT STOPS
Pedestrian Warning Sign
Packet Pg. 182 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
40 MAP 10:
PEDESTRIAN CRASHES NEAR TRANSIT STOPS
Packet Pg. 183 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
41 PHOTO
1 Packet Pg. 184 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
42 ACTION PLAN
Sacramento adopted its Vision Zero policy in 2017, but the City’s efforts to improve traffic safety did not begin there.
Numerous safety projects and programs have already been implemented throughout the City.
Our Progress To Date
Here’s the most recently implemented programs
throughout the City:
1 Installation of the City’s first segment of cycle track 2 Sacramento City College Bicycle and
Pedestrian Bridge
3 Mid-block crossings with enhanced safety features,
such as Rectangular Rapid Flashing Beacons
4 Freeport Blvd road diet, bike lane and pedestrian
improvements
5 Carlson Drive Bicycle and Pedestrian Improvements
– includes the City’s first bicycle signal phase, bike
box, and two-stage left-turns for bicyclists
6 C Street bike lane project providing improved
school access
7 City of Sacramento monthly Urban Cycling Class
8 Over $22 million in safety grant improvements
2013-2017
Packet Pg. 185 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
43 The City has also been hard at work
securing funding for future projects,
including winning a $250,000 grant
from Caltrans’ Systemic Safety Analysis
Report Program and an Office of Traffic
Safety Grant for Vision Zero Outreach
and Education in 2017. In addition, the
City has secured federal engineering
and construction funds for the following
capital projects currently in project
development, many of which are on
city arterial roadways:
» A Class IV separated bikeway on
North 12th Street - $3,378,000 (on the
HIN)
» The Broadway Complete Streets
project that includes a road diet,
buffered bike lanes, and curb
extensions along a major arterial
roadway - $2,763,000 (on the HIN)
» The Meadowview Complete Streets
which includes buffered bike lanes,
separated sidewalks and high visibility
crosswalks, in addition to median and
streetscape improvements on a high
speed arterial roadway identified on
the high injury network $4,536,000
» D.W Babcock and Northwood School
improvements which include signals,
connecting sidewalk gaps, and curb
extensions on El Camino Avenue
which has been identified on the
high injury network: $995,700
» The Franklin Boulevard Complete
Streets which is evaluating the road
diet of a major arterial roadway on
the high injury network to provide
bike lanes, street enhancements,
and separated sidewalks $800,000
» Class IV separated bikeways along
Franklin Boulevard $315,000 (on the
HIN)
» Downtown Parking Protected
Bikeways $491,000, locally-funded
(on the HIN)
The Vision Zero Action Plan will
build on these successes to guide
proactive implementation of future
safety projects focused on eliminating
fatalities and serious injuries for all
roadway users by 2027.
Acknowledgment of Preventable Incidents: Crash, Not Accident The City of Sacramento commits to using the word “crash,” not “accident,” to acknowledge that these incidents can be systematically addressed.
In adopting this language, the City joins a long list of local, state and federal agencies with similar policies. In a 2014 letter to Federal Highway Administration staff, George L. Reagle, Associate Administrator for Motor Carriers at the U.S. Department of Transportation wrote:14
Changing the way we think about events and the words we use to describe them affects the way we behave. Motor vehicle crashes occur “when a link or several links in the chain” are broken. Continued use of the word “accident” implies that these events are outside human influence or control. In reality, they are predictable results of specific actions…
The Federal Highway Administration has joined the National Highway Traffic Safety Administration in declaring that the word “accident” will no longer be used in materials we publish, in speeches or other statements, or in communications with the media and others.
Packet Pg. 186 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
44 Implementable Actions
Vision Zero implementation will involve
a committed team of City departments,
the Sacramento community, and
partner organizations. This team has
identified a set of key actions to serve
as a roadmap towards Vision Zero.
Every action is assigned a time frame, a
metric to measure progress, and a core
leadership group. Short-term actions will
be implemented within 0-2 years and
long-term actions will be implemented
within 2-10 years. The implementable
actions directly address the Plan’s 10
Crash Profiles.
The Implementable Actions are
organized into five action areas:
1.Vision Zero Program
2. Street Design
3. Dangerous Behaviors
4.Access to Key Destinations
5.Vulnerable Road Users
Performance Measures
The City’s primary performance measure
to evaluate progress is the change in
the number of KSI crashes, with the
ultimate goal to reach zero KSI crashes
by 2027. The City will also measure its
progress based on the change in the
number of crashes under each of the
10 Crash Profiles. In its annual Vision
Zero progress report, the City will
also measure progress on each of the
Implementable Actions identified in
the Action Plan.
Next Steps
One significant next step that the City is
already working towards is identifying
the first engineering projects to
implement on Sacramento’s streets.
These projects will be located along
the HIN, and will incorporate the
countermeasures identified in this Plan
to combat the crash types identified in
the Crash Profiles. The specific locations,
project scopes, and cost estimates
must be developed for candidate
projects, and then the projects will be
prioritized for implementation. The City
of Sacramento has secured $250,000
grant funding from Caltrans’ Systemic
safety Analysis Report Program to do
this work.
Packet Pg. 187 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
45 ACTION
1. VISION ZERO PROGRAM
1.1 Include Vision Zero on agendas for all City sponsored meetings, and education opportunities such as the Planning Academy.
1.2 Convene regular meetings of executive-level departmental representatives to coordinate Vision Zero efforts.
1.3 Develop a workshop for media professionals on how to best communicate about traffic crashes and roadway safety.
1.4 Launch online, interactive crash data map and website.
1.5 Identify a permanent, dedicated funding source for Vision Zero implementation and coordination.
1.6 Incorporate Vision Zero safety principles into all future City plans and design documents.
1.7 Provide ongoing safety related training and support to City staff responsible for street design and enforcement activities.
1.8 Publish an annual report to measure progress against the goals of the Action Plan.
2. STREET DESIGN (ADDRESSES PROFILES 3 & 4)
2.1 Update City street design standards to reflect complete streets and designs reflective of crash reduction factors.
2.2 Develop designs and secure grant funding for first Top 5 priority corridors, with a focus on roadway designs for reduced speeds.
2.3 Install low-cost safety improvements at 10 locations, including new road markings, signs, and minor signal modifications per year.
2.4 Develop prioritized list and deliver half of engineering safety projects on the HIN in Disadvantaged Communities (commensurate with share of fatal collisions).
2.5 Establish internal process to ensure that Vision Zero countermeasure options are evaluated and implemented where feasible on projects that fall within the HIN.
2.6 Enhance street lighting to improve visibility throughout the HIN.
2.7 Prioritize at least 10 capital project locations on HIN to address roadway designs for reduced speeds; develop project designs and secure funding. Focus on geographic equity and Disadvantaged Communities.
2.8 Work with local, state and federal partners to update the current 85th percentile methodology for setting speed limits.
VISION ZERO ACTIONS
Packet Pg. 188 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
46 TIME LINE PARTNERS METRIC
Short-Term CC, NA Number of meetings with Vision Zero on agenda Short-Term PW, CD, PR, SPD, CMO Number of executive-level participants Long-Term CMO Number of media professionals participating Long-Term IT Number of website visitors
Short-Term CC Amount of funding available for Vision Zero Long-Term CD, PW Number of plans and policies incorporating Vision Zero Long-Term SPD Share of SPD officers trained
Long-Term PW Annual report addressing all metrics and performance measures Short-Term PW Design standards updated
Short-Term PW Number of projects implemented
Short-Term PW Number of projects implemented
Long-Term PW Share of projects delivered in Disadvantaged Communities Long-Term PW, CD Share of public and private projects incorporating Vision Zero elements Long-Term PW Share of HIN with upgraded street lighting Long-Term PW Number of project implemented. Geographic distribution of projects.
Share of projects in Disadvantaged Communities.
Long-Term GP Number of local, state and federal policy changes to support Vision Zero Partner Acronyms
BID Business Improvement Districts
CC City Council
CD Community Development
CMOCity Manager's Office
GP Government partners (SACOG, State Legislature,
Governor's Office, League of CA Cities)
IT Information Technology
NA Neighborhood Associations
PO Partner Organizations (AARP, SABA,
Walk Sacramento, etc.)
PR Parks & Recreation
PW Public Works
RT Sacramento Regional Transit
SD School Districts
SPD Sacramento Police Department
TNC Lyft, Uber, Taxi companies
Packet Pg. 189 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
47 ACTION
3. DANGEROUS BEHAVIORS (ADDRESSES PROFILES 1 & 2)
3.1 Launch high-visibility education PSA campaigns against speeding, distracted driving, impaired driving, and other high-risk behaviors. Campaigns will focus on HIN corridors.
3.2 Explore opportunities to expand free or subsidized transit fares during holidays and for special events.
3.3 Increase the use of speed feedback signs to discourage speeding.
3.4 Support state Automated Speed Enforcement legislation.
3.5 Launch high-visibility enforcement campaigns against speeding, failure to yield to pedestrians, distracted driving, and impaired driving. Campaigns will focus on HIN corridors.
3.6 Deter impaired driving by targeting education and outreach at alcohol-serving establishments.
3.7 Develop public promotional campaign to encourage late-night transit, taxi, rideshare, and other services to provide alternatives to impaired driving.
3.8 Increase number of traffic enforcement officers to number recommended by best practices.
3.9 Integrate Vision Zero curriculum into PD Academy curriculum and in-service Police Officer training.
3.10 Improve data collection and reporting on speed, impairment, cell phone use, and distraction for KSI collisions.
3.11 Work with local, state and federal partners to lower legal blood alcohol levels.
4. ACCESS TO KEY DESTINATIONS (ADDRESSES PROFILES 7 & 10)
4.1 Install at least one low-cost or pilot project engineering countermeasure project in a neighborhood-serving commercial area each year.
4.2 Improve safe pedestrian and bicycle access to transit stops along key bus routes and near light rail stations.
4.3 Prioritize at least 10 capital project locations on HIN to improve access to commercial areas and transit stops; develop project designs and secure funding. Focus on geographic equity and Disadvantaged Communities.
4.4 Evaluate school areas eligible for reduced speed limits and implement.
Packet Pg. 190 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
48 TIME LINE PARTNERS METRIC
Short-Term SPD Number of peopled reached
Short-Term RT Number of people using free or subsidized fares Short-Term PW Number of signs installed
Short-Term CC, SPD, GP Adoption of state legislation
Short-Term SPD Number of enforcement campaigns
Long-Term SPD, BID Number of establishments reached
Long-Term SPD, TNC, RT Number of people reached
Long-Term SPD Number of traffic officers
Long-Term SPD Number of officers trained on Vision Zero Long-Term SPD Share of collision records including this data Long-Term GP Number of local, state and federal policy changes to support lowering legal blood alcohol levels
Short-Term PW, NA, BID Number of projects implemented
Long-Term PW, RT Share of transit stops and stations that have improved access Long-Term PW, BID, RT Number of project implemented. Geographic distribution of projects. Share of projects in Disadvantaged Communities.
Long-Term PW, SD Share of schools with a school zone
Partner Acronyms
BID Business Improvement Districts
CC City Council
CD Community Development
CMOCity Manager's Office
GP Government partners (SACOG, State Legislature,
Governor's Office, League of CA Cities)
IT Information Technology
NA Neighborhood Associations
PO Partner Organizations (AARP, SABA,
Walk Sacramento, etc.)
PR Parks & Recreation
PW Public Works
RT Sacramento Regional Transit
SD School Districts
SPD Sacramento Police Department
TNC Lyft, Uber, Taxi companies
Packet Pg. 191 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
49 ACTION
5. VULNERABLE ROAD USERS (ADDRESSES PROFILES 5, 6, 8 & 9)
5.1 Collaborate with local stakeholders near the HIN with a special emphasis on reaching vulnerable and under served populations.
5.2 Revisit pedestrian crossing guidelines for signalized and unsignalized intersections.
5.3 Develop PSA campaign aimed at drivers to increase safety for pedestrians age 60+.
5.4 Update City signal timing policy to improve safety for all modes (e.g. all red time, pedestrian crossing times).
5.5 Complete 10 projects that improve bicycle and pedestrian safety related to turning vehicles at intersections.
5.6 Continue building the enhanced bikeway network consistent with the Bicycle Master Plan.
5.7 Install at least 10 pedestrian crossing treatments on the HIN.
5.8 Install pedestrian countdown timers at every signalized crossing location throughout the City.
5.9 Develop and implement at least 10 trust-building opportunities related to traffic safety among law enforcement and low-income communities, and communities of color.
5.10 Establish regular pedestrian and bicyclist counts at consistent locations in order to understand collision rates and exposure, develop walking and biking data that can be analyzed over time, and assist in prioritizing investments.
Packet Pg. 192 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
SACRAMENTO VISION ZERO ACTION PLAN
50 TIME LINE PARTNERS METRIC
Short-Term PW, NA, PO Number of public meetings
Short-Term PW Share of crossings meeting design criteria Short-Term CMO, PO Estimated number of people reached
Short-Term PW Share of signals meeting updated policy
Long-Term PW Number of projects implemented
Long-Term PW Lane miles of low-stress facilities installed Long-Term PW Share of crossings that have been upgraded Long-Term PW Share of crossings with countdown timers
Long-Term SPD, NA, PO Number of public meetings & events Long-Term PW, PO Number of counts that have taken place Partner Acronyms
BID Business Improvement Districts
CC City Council
CD Community Development
CMOCity Manager's Office
GP Government partners (SACOG, State Legislature,
Governor's Office, League of CA Cities)
IT Information Technology
NA Neighborhood Associations
PO Partner Organizations (AARP, SABA,
Walk Sacramento, etc.)
PR Parks & Recreation
PW Public Works
RT Sacramento Regional Transit
SD School Districts
SPD Sacramento Police Department
TNC Lyft, Uber, Taxi companies
Packet Pg. 193 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
ACKNOWLEDGMENTS
Elected Officials
Darrell Steinberg
Mayor
Council Members
Angelique Ashby (District 1)
Allen Warren (District 2)
Jeff Harris (District 3)
Steve Hansen (District 4)
Jay Schenirer (District 5)
Eric Guerra (District 6)
Rick Jennings, II (District 7)
Larry Carr (District 8)
City of Sacramento Staff
Hector Barron
Director of Public Works
Ryan Moore
Interim City Traffic Engineer
Jennifer Donlon Wyant
Active Transportation
Program Specialist
Vision Zero Task Force
Julie Bates
AARP
Megan Sheffield
Sacramento County Department
of Health and Human Services
Randy Weissman
California Office of Traffic Safety
Jim McDonald
City of Sacramento Planning
Department Division
Dave Edrosolan
City of Sacramento Public Works
Transportation Division
Chris Jensen
Resources for Independent Living
Walt Seifert
Sacramento City/County Bicycle
Advisory Committee (SacBAC)
Victoria Cacciatore
Sacramento Area Council of
Governments (SACOG)
Jim Brown
Sacramento Area Bicycle Advocates
Rhonda DeSmet
Sacramento City Unified School District
Assistant Chief Scott Williams
Sacramento Fire Department
Lt. Justin Risley
Sacramento Police Department
Jeff Damon
Sacramento Regional Transit
Diane Starin
Society for the Blind
Kirin Kumar
WalkSacramento
Fehr & Peers
Consultant Team
David Carter
Dana Weissman
Meghan Mitman
Kyle Shipley
Emily Finkel
SACRAMENTO VISION ZERO ACTION PLAN
51 Packet Pg. 194 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 1 2012 California Household Travel Survey. Daily Mode Share, City of Sacramento (All Trip Purposes).
2 California Highway Patrol. Collision Investigation Manual, HPM 110.5. February 2003.
3 Rosencrantz, H., Edvardsson, K., & Hansson, S. O. (2007).
Vision zero–Is it irrational? Transportation research part A:
Policy and practice, 41(6), 559-567.
4 New York City Department of Transportation. Vision Zero Year Three Report. February, 2017. Retrieved from: http://www1.nyc.gov/assets/ visionzero/downloads/pdf/vision-zero-year-3-report.pdf
5 Vision Zero Network. Vision Zero 101: Approach for Mid-Sized Cities webinar. Delivered by Hans Larsen, Public Works Director, Fremont, California. September 20, 2017.
6 County of Sacramento Department of Health and Human Services. (2008). Community Health Status Report, 2008. Retrieved from http://www.dhhs.saccounty.net/PUB/Documents/Disease-ControlEpidemiology/2008-Health-Status-Profile-Report.pdf 7 U.S. Department of Transportation National Highway Safety Administration. Literature review on vehicle Travel Speeds and Pedestrian Injuries. October 1999. https://one.nhtsa.gov/people/ injury/research/pub/HS809012.html
8 Disadvantaged Communities are defined under California State Senate Bill 535 as the top 25% of census tracts within the State of California with the highest CalEnviroScreen 2.0 score.
CalEnviroScreen 3.0, which provides the most recent available health and environmental indicator data, had not yet been released at the time of our analysis.
9 A database was built using geocoded crash data from the Transportation Injury Mapping System (TIMS), managed by the Safe Transportation Research and Education Center (SafeTREC) at the University of California, Berkeley.
RESOURCES
10 California Highway Patrol. Collision Investigation Manual. Revised February 2003.
11 California Vehicle Code Section 22350.
12 Efficacy estimates are based on the latest road safety research compiled by Caltrans and the Federal Highway Safety
Administration.
13 Centers for Disease Control and Prevention. What Works: Strategies to Reduce or Prevent Drunk Driving. Retrieved from: https://www. cdc.gov/motorvehiclesafety/impaired_driving/strategies.html 14 Reagle, G.L. A Crash is Not an Accident. Federal Motor Carrier Safety Administration. March 4, 2014. https://www.fmcsa.dot.gov/ newsroom/crash-not-accident
SACRAMENTO VISION ZERO ACTION PLAN
52 Packet Pg. 195 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Packet Pg. 196 Attachment: City of Sacramento Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) City of Watsonville
Vision Zero Action Plan 2021
1 Packet Pg. 197 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) 2 Packet Pg. 198 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
TABLE OF CONTENTS
Section Topic ...................................................................................... Page 1 Why Vision Zero? .........................................4 2 Mission Statement/Goal/Objectives ................6
3 Partners ....................................................7 Core Principles ...........................................8 4 2020 Summary.............................................9 5 Action Items................................................ 11 6 Priority Projects......................................... 19 Appendices
I Outreach & Findings.....................................20 II Collision Data & Analysis..............................22 III The impact of Traffic Violence
on the City of Watsonville.............................28 3 Packet Pg. 199 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) WHY VISION ZERO?
Vision Zero is a world-wide strategy to eliminate all traffic fatalities and severe injuries to ensure safe, healthy, equitable mobility
for all. It was first implemented in Sweden
in the 1990s and takes a systems approach to
achieve safe, healthy, and equitable mobility. Vision Zero starts with the ethical belief that everyone has the right to move safely in
their communities. In order to achieve a safe
transportation system, it requires that everyone consider the system in its entirety. Safe transportation systems and related policies
should be designed to ensure that those inevitable mistakes do not result in severe injuries or fatalities.
In January 2018, the Watsonville City
Council adopted a resolution that outlines
how the City can draw upon existing resources to successfully implement Vision Zero. In 2015 and 2016, the City had 39 and 42 pedestrian collisions and a California Office of Traffic Safety rating of #1 when compared with 105 California cities of similar size. In 2017
and 2018 there were 24 and 30 collisions and
#15 and #5 rankings..
There are two factors that are 3 times
more likely to cause crashes in Watsonville
than any other factor: unsafe speeds (which
accounts for 26.4% of all crashes) and right of
The City of Watsonville ranks number one for injuries
and fatalities among pedestrians under the age of 15
years old and the 4th worst for pedestrians overall
when compared to 105 California cities of similar size. “
4 Packet Pg. 200 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) way violations (29.5% of all crashes).
2 Thirty
percent of fatal and serious injury crashes
occur on 2 miles (2.2%) of city streets.2 Moreover, these city streets are in low-income neighborhoods.2 An additional 25% of fatal
and serious injury crashes occur on 1.9 miles
of the State highways within city limits.2
Vision Zero holds that traffic deaths and
severe injuries are preventable through a
close examination of the shortcomings of
existing transportation systems and user behavior. Through the collaboration of a multidisciplinary team and changes in roadway design, speed management, technology, and
policies, meaningful behavior change can
occur. However, as all humans are fallible,
collisions will happen. To achieve the shared
goal of zero fatalities and severe injuries, the
responsibility of ensuring a safer transportation system therefore lies upon the multidisciplinary team and not only on the individual road user.
The City of Watsonville’s Vision Zero Action Plan” acknowledges that traffic deaths and severe injuries are preventable. The goal
is to eliminate both in a set time frame with
clear, measurable, and timely strategies. The
plan will use a multidisciplinary approach
and bring together diverse and necessary
stakeholders to address this complex problem and achieve Vision Zero by 2030. 1 https://visionzeronetwork.org/about/what-is-vision-zero/ 2 Report by the Community Traffic Safety Coalition and with funding from CA OTS (2014) and the Santa Cruz County RTC. www.sctrafficsafety.org/VisionZero Updated 1/10/18.
5 Vision Zero holds that traffic
deaths and severe injuries
are preventable through a
close examination of the
shortcomings of existing
transportation systems and
“
user behavior.
Packet Pg. 201 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
MISSION STATEMENT
1. Focus on changing behavior through policies and strategies guided by the six E’s:
Encouragement, Education, Enforcement, Evaluation, Engineering, and Equity.
2. Gather, analyze, utilize and share reliable data to understand traffic safety issues, to prioritize resources based on evidence of the greatest need and impact, and to track and evaluate the success of these efforts.
3. Prioritize the development of safe roadways and the highest level of safety for all road users through new policies, systems and infrastructure improvements for pedestrians, bicyclists and motorists.
4. Create an Action Plan in a manner that promotes equity, community engagement and transparency by presenting it to Council for acceptance and approval and providing Council with regular updates on its development and implementation.
To reduce traffic related deaths and severe injuries
through community collaboration, data analysis,
policies, systems, and infrastructure.
Goal
objectives
Mission
Statement
6 Packet Pg. 202 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
PARTNERS
Improving safety requires collaboration and
engagement by all stakeholders. The Vision
Zero Action Plan shall be developed in a col-
laborative manner by a Vision Zero Task Force
and with input from the community. The fol-
lowing agencies/organizations/departments
are involved in Vision Zero in addition to inter-
ested members of the community. The WVZ-
TF is a workgroup of the Community Traffic
Safety Coalition (CTSC) which is staffed by the
County of Santa Cruz Health Services Agency.
Those involved with the WVZTF are indicated
with an asterisk. • Bike Santa Cruz County • Community Members • Ecology Action • Pajaro Valley Unified School District • Santa Cruz County Health Services Agency
• Santa Cruz County Regional
Transportation Commission
• State Department of Transportation
(Caltrans) District 5
• United Way Jóvenes SANOS • Watsonville City Manager’s Office • Watsonville Community Development Department
• Watsonville Police Department • Watsonville Public Works & Utilities Department
7 Packet Pg. 203 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
CITY OF WATSONVILLE
VISION ZERO
CORE PRINCIPLES
1. Traffic deaths and severe injuries are acknowledged to be preventable.
2. Safety of human life is our highest priority, and all are responsible.
3. The transportation system should account for human error and plan to minimize the severity of repercussions.
4. Actions towards Vision Zero will be data-driven based on available crash data and will include on-going evaluation measuring performance objectives.
5. Speed is a fundamental predictor of crash survival and severity 8 Packet Pg. 204 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
1. Created the Watsonville Vision Zero Task Force and created a logo that highlights various modes of transportation and iconic Watsonville landmarks.
2. Provided public safety education through a media campaign in partnership with several other Santa Cruz County agencies.
3. Promoted walking, biking and traffic safety through in-classroom training, providing safety equipment, operation of the City Police Department social media site with new apps and regular social media posts.
4. Supported ongoing work with State legislators to lower speed limits.
5. Continued implementation of Pedestrian Safety Zones on high collision corridors.
6. Operated the Neighborhood Traffic Plan and traffic calming programs with installations along Clifford Street.
7. Installation of various Capital Improvement Projects including new traffic signals on West Beach St at Ohlone Parkway and on Airport Blvd at Holm Rd (in progress) and construction of the Rail Trail Segment 18 Phase 1 (in progress).
8. Continued developing partnerships with Caltrans on preparing plans and constructing improvements within the State right of way and identifying and securing funding. This included requesting additional funding on a 2024 State Highway Operation and Protection Program (SHOPP) project to pave Hwy 152 and include bicycle and pedestrian improvements on Hwy 129 and 152.
9. Worked with various partners to submit or participate in Active Transportation Program Cycle 5 grant applications for the Safer Access to Pajaro Valley High School and Beyond project and the Safe Routes for Watsonville School Families and Community project. 2020 SUMMARY
During 2020, the City of Watsonville furthered Vision Zero by doing the following:
9 Packet Pg. 205 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) action items key
6 E’s Encouragement, Education, Enforcement, Evaluation, Engineering, and Equity
CDD Community Development Department
COW City of Watsonville- all departments
DPW City of Watsonville Public Works & Utilities Department HSA Santa Cruz County Health Services Agency
PTSAP City of Watsonville Pedestrian and Traffic Safety Action Plan (January 2019)
SafeTREC UC Berkeley Safe Transportation Research and Education Center (SafeTREC) and CalWalks’ report for Watsonville titled
“Recommendations to Improve Pedestrian and Bicycle Safety” (October 2018)
WVZTF Watsonville Vision Zero Task Force (WVZTF)
Resolution City of Watsonville Vision Zero Resolution (January 2018) WCM City of Watsonville City Manager’s Office
WPD City of Watsonville Police Department
WTC City of Watsonville Traffic Committee (Public Works & Police Department)
VZTF Vision Zero Task Force (to be formed)
Short-Term Within a year
Mid-Term 1-3 years
Long-Term 4 or more years
10 Packet Pg. 206 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
ACTION ITEMS
Action Item 6 E’s Source Responsible Partner/s Timeline 1 Continue the work of the Vision Zero Task Force as described in Partner section above. ALL Resolution, PTSAP, WVZTF ALL On-Going 2 Improve City of Watsonville’s status from a Bronze to Silver Level Bicycle Friendly Community through the League of American Bicyclist’s Bicycle Friendly Community program and apply for a Walk Friendly Communities award through the University of North Carolina’s Highway Safety Research Center.
Encouragement WVZTF WVZTF Mid-Term
3 Develop a comprehensive pedestrian, bicyclist and driver public safety education campaign, such as Street Smarts, that includes targeted messages.
Education
Equity
PTSAP, WVZTF,
SafeTREC
WVZTF, WCM,
DPW, WPD
Short-Term
On-Going
4 Continue work in school communities through the Safe Routes to School (SRTS) programs:
a. Promote walking, biking, and traffic safety education. b. Provide safety equipment, such as bicycle helmets.c. Expand high school and middle school active transportation programming Education WVZTF &
SafeTREC
WVZTF
Short-Term
On-Going
5 Identify most at-risk populations for targeted messages Education Evaluation
Encouragement
Equity
WVZTF WVZTF, DPW,
WPD
Short-Term
On-Going
6 Work with State legislators to implement legislation to support Vision Zero, such as:
a. Lower speed limitsb. Allow speed camerasc. Increase distracted driving penaltiesd. Direct staff to work with state legislatures to pursue legislation to allow City to reduce traffic speeds along high-risk corridors Education
Engineering
Enforcement
PTSAP &
WVZTF
ALL Long-Term
Packet Pg. 207 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Action Item 6 E’s Source responsible Partner/s Timeline 7 Develop, adopt, and incorporate Complete Streets Policy into projects Education WVZTF ALL On-Going8 Coordinate Vision Zero efforts with existing and future City planning documents & policies, including Complete Street Plans for downtown and schools and Freedom Blvd plan line Engineering
Equity WVZTF WVZTF, DPW, CDD Mid-Term
9 Target high risk populations, such as pedestrians under 15 years of age and children not properly restrained in vehicles.
Education
Equity WVZTF WVZTF, WPD Short-Term
10 Develop and implement on Pedestrian Safety Zones on Main St, Freedom Blvd, and Airport Blvd and other high collision corridors as identified Enforcement PTSAP DPW/WPD Short-Term11 Focus enforcement efforts on impaired and distracted driving, including DUI Saturation and checkpoints Enforcement Education PTSAP WPD Short-Term Mid-Term12 Continue to identify most dangerous behaviors for motorists, pedestrians, and bicyclists and conduct neighborhood traffic safety education Enforcement Education PTSAP & WVZTF HSA, DPW, WPD, WTC On-Going13 Continue and expand social media efforts by Police Department on:
a. Adding Public Information Officerb. Develop websitec. Develop new appsd. Provide social media posts Enforcement
Education PTSAP WPD On-Going
ACTION ITEMS
Packet Pg. 208 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Action Item 6 E’s Source Responsible Partner/s Timeline 14 Continue and expand community outreach efforts by
Police Department on:
a. Bike Smart/Walk Smartb. Community eventsc. Community awareness presentationsd. Bike helmet distribution program Enforcement PTSAP & WVZTF WPD Mid-Term
15 Develop a zero-tolerance approach for speeding along areas designated as Pedestrian Safety Zones Enforcement PTSAP WPD Short-Term16 Develop a Zero-Tolerance approach for speeding along areas designated as Pedestrian Zafety Zones Enforcement DPW WPD, DPW On-Going17 Implement data analysis:
a. Establish regular data analysis and measurable metricsb. Refine analysis to include collision type, street type,movements preceding collisionc. Use “predictive analytics” to identify trends andpredict collisions where similar conditions existd. Use metrics to track and measure progress in all focus areas Evaluation WVZTF WPD, DPW Mid-Term
18 Establish regular data review:
a. Monitor data to evaluate success of programs and projectsb. Monitor data to identify priority corridors, select future programs and projectsc. Monitor to identify demographic inequities Evaluation
Equity WVZTF WPD, DPW Mid-Term
ACTION ITEMS
13 Packet Pg. 209 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
ACTION ITEMS
Action Item 6 E’s Source Responsible Partner/s Timeline 19 Gather, analyze, utilize and share reliable data to:
a. Understand traffic safety issues;b. Prioritize resources based on evidence of the greatest need and impact;c. Improve data collection where there are higher collisions;d. Track and evaluate the success of these efforts.
Evaluation Resolution WVZTF, VZTF Mid-Term
20 Inventory existing facilities:
Sidewalk, street lighting, bike facility, ped feedback at signals, bike detection, etc. Engineering WVZTF DPW Mid-Term 21 Coordinate projects to maximize benefits:
a. Add facilities when restriping after resurfacing or after utility projects b. State and local projectsc. Identify locations for low-cost, temporary solutionsd. Citywide restriping and signage programs Engineering WVZTF DPW Mid-Term
22 Identify and secure consistent funding:
a. Use Measure D and SB 1 fundingb. Secure competitive grants through ATP program Engineering
Equity WVZTF DPW On-Going
23 Continue Neighborhood Traffic Plan & traffic calming programs:
a. Conduct a road study before setting speed limitb. Install 3-foot law and Bikes May Use Full Lane road signs Engineering
Enforcement
Evaluation
Equity
WVZTF DPW Short-Term On-Going
24 Continue developing trail network, establish maintenance program and funding source for priority trails
Engineering
Evaluarion
Equity
WVZTF DPW Mid-Term
Packet Pg. 210 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
ACTION ITEMS
Action Item 6 E’s Source Responsible Partner/s Timeline 25 Capital improvements program:
a. Lincoln Street Safety Improvementsb. City Signal Upgradesc. Hwy 1/Harkins Slough Rdd. Lee Rd Trail Engineering WVZTF DPW Short-Term On-Going
26 Prioritize the development of safe roadways and the highest level of safety for all road users through new policies, systems, and infrastructure improvementsfor pedestrians, bicyclists, and motorists Engineering
Equity Resolution DPW On-Going
27 Explore new approaches to infrastructure enhancements, including speed cameras, sidewalk decals, and pedestrian crosswalk flags Engineering PTSAP DPW,WPD Short-Term On-Going 28 Conduct bicycle and pedestrian assessments on major arterials and determine potential solutions to make walking and biking along routes, such as Freedom Blvd, safer for residents Engineering
Equity SafeTREC DPW Long-Term On-Going
29 Promote safety and accessibility for vulnerable road users with the following:
a. ADA sidewalk accessibility and pedestrian sidewalk facilities improvements (such as sidewalk gap closures, curb extensions, improved curb ramps, better driveway visibility, and improved locations of items such as utility posts and boxes)b. Bicycle facilities and infrastructure improvements such as increased signage, sharrow improvements, repainted bike lanes, and road repairc. Improved safe infrastructure for pedestrians, including repainted crosswalks, added signage, advanced yield markings, and curb ramps Engineering
Equity SafeTREC DPW Long-Term On-Going
Packet Pg. 211 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Action Item 6 E’s Source Responsible Partner/s Timeline 30 Continue collaboration on a countywide comprehensive traffic safety media campaign, with customized messages for Watsonville, including developing Public Service Announcements to inform residents how to travel safely and how to share road space safely (Street Smarts).
Engineering
Equity SafeTREC DPW On-Going
31 Plan for cost-effective paint and signage improvements that could be integrated into the next pavement maintenance project for identified corridors Engineering
Equity
Engineering
Equity SafeTREC DPW
32 Implement a pop-up/temporary demonstration projects, such as a protected bike lane, to expose residents to what a reconfigured street could look like Engineering
Education
Equity
SafeTREC DPW/WVZTF Short-Term
33 Assess the following recommendations for the Freedom Blvd corridor:
a. Build underground utilities along the corridorb. Establish shared paths where the right-of-way may be constricted that provide combined sidewalks and protected bicycle facilitiesc. Expand the right-of-way to allow for wider sidewalks and protected bike lanes as a part of a road diet Engineering
Equity SafeTREC DPW Long-Term
34 Create a traffic violence crisis response program, including supports for families who have lost loved ones Equity WVZTF WVZTF On-Going 35 Identify most at-risk populations for targeted messages, keeping in mind that the most vulnerable are usually low-income and communities of color Equity WVZTF WVZTF Mid-Term 36 Provide regular updates and communication with City Council and community and regular updates to Council for acceptance, approval, development process, and implementation Equity Resolution ALL Short-Term On-Going
ACTION ITEMS
Packet Pg. 212 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Action Item 6 E’s Source Responsible Partner/s Timeline 37 Establish a City Bicyclist and Pedestrian Advisory Committee Equity SafeTREC ALL Mid-Term
38 Partner with Mountain Bikers of Santa Cruz County to:
a. Build a pump track;b. Conduct bicycle education and helmet distribution at pump tracks.
Engineering
Education WVZTF WVZTF Mid-Term
39 Identify and install improvements along Freedom Blvd and State Route 152/Main St that will improve the safety and visibility of pedestrians and bicyclists. Particular attention shall be given to the State Route 152/Main St intersections with Auto Center Dr, Pennsylvania Dr, Ohlone Pkwy/Clifford Ave and Rodriguez St.
Engineering WVZTF DPW Mid-Term
40 Improve data collection where there are higher collisions.
Evaluation WVZTF WPD,DPW Mid-Term
41 Implement and expand traffic calming strategies including trash can sticker and signage programs. Education WVZTF DPW, HSA Mid-Term 42 Seek funding for pedestrian and traffic safety projects as identified in the Complete Streets Downtown Plan, the Complete Streets Safe Routes to School Plan and the Vision Zero Action Plan. Funding sources include grants through Cycle 6 of the Active Transportation Program, which will be accepting applications in 2022.
Engineering
Equity WVZTF DPW, Caltrans Mid-Term
ACTION ITEMS
17 Packet Pg. 213 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Action Item 6 E’s Source Responsible Partner/s Timeline 43 Seek opportunities to partner with Caltrans:
a. On projects within State right of way;b. On projects that involve Caltrans grant funding;c. To identify projects within State Highway Operation and Protection Program (SHOPP) that can incorporate additional complete streets improvements driven from local planning efforts; d. To include as partner and sub-applicant when applying for grant funding.
Engineering
Equity WVZTF DPW, Caltrans Mid-Term
44 Address traffic safety concerns identified in the current City of Watsonville Downtown Specific Plan. These include improving pedestrian safety and bicycle and pedestrian facilities along Main Street and nearby streets downtown.
Engineering
Equity WVZTF
WVZTF,
DPW,
CDD
Mid-Term
45 Lower and keep speeds at 25 mph or less around schools, neighborhoods, and downtown areas as identified in the City’s Complete Streets Safe Routes to School Plan.
Engineering
Enforcement WVZTF WPD, DPW Long-Term
46 Develop sharrow protocol and education campaign Engineering Enforcement WVZTF WPD, DPW Mid-Term
46 Consider hosting Bike Parties to create spaces for youth who may be exploring cycling as a form of self-expression. Encourage safe cycling behavior and street smarts within Bike Parties.
Education WVZTF ALL Mid-Term
47 Review Watsonville Municipal Code, including Section 4-1, for rules regarding bicycles. Consider updating and revising, including the following:
a. Prohibition of riding bicycles on sidewalks;b. Licensing of bicycles.
Enforcement WVZTF WPD, DPW Long-Term
ACTION ITEMS
Packet Pg. 214 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Action Item 6 E’s Source Responsible Partner/s Timeline 1 Improve City of Watsonville’s status from a Bronze to Silver Level Bicycle Friendly Community through the League of American Bicyclist’s Bicycle Friendly Community program and apply for a Walk Friendly Communities award through the University of North Carolina’s Highway Safety Research Center.
Encouragement WVZTF WVZTF Mid-Term
2 Continue collaboration on a countywide comprehensive traffic safety media campaign, with customized messages for Watsonville, including developing Public Service Announcements to inform residents how to travel safely, and how to share road space safely.
Education SafeTREC DPW On-Going
3 Develop and implement Pedestrian Safety Zones on Main St, Freedom Blvd, and Airport Blvd and other high collision corridors as identified
Enforcement PTSAP DPW, WPD Short-Term
4 Identify and secure consistent funding:
a. Use Measure D and SB 1 fundingb. Secure competitive grants through ATP program Engineering WVZTF WPD, DPW On-Going
5 Gather, analyze, utilize and share reliable data to:
a. Understand traffic safety issues;b. Prioritize resources based on evidence of the greatest need and impact;c. Improve data collection where there are higher collisions;d. Track and evaluate the success of these efforts.
Evaluation WVZTF WPD, DPW Mid-Term
6 Continue Neighborhood Traffic Plan & traffic calming programs:
a. Conduct a road study before setting speed limitb. Install 3-foot law and Bikes May Use Full Lane road signs Equity WVZTF DPW Short-Term On-Going
PRIORITY PROJECTS FOR 2020-2021
19 Packet Pg. 215 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
APPENDIX I OUTREACH & FINDINGS
The City of Watsonville conducted outreach on Vision Zero through a survey. Between April 2018 and June 2018, 241 surveys were collected at 7 community events. The community events included Day of the Child (4/22/18), Pajaro Valley Business Expo (4/26/19), Cinco de Mayo (5/6/18), City Staff Surveys (5/8/18), Bike to Work Day (5/10/18), Open Streets Watsonville (6/3/18), and Family Fun Fest (6/9/18). Respondents were asked in English or Spanish the following open-ended questions:
1. What unsafe behaviors by pedestrians, bike riders, and drivers have you observed in Watsonville?
2. What do you think could be done to change these unsafe behaviors?
3. What changes can you commit to doing to improve traffic issues?
4. In the City of Watsonville, where do you feel unsafe walking? Why?
5. In the City of Watsonville, where do you feel unsafe biking? Why?
6. In the City of Watsonville, where do you feel unsafe driving? Why? The respondents indicated that the most
unsafe motorist behaviors observed
were: failing to stop for pedestrians at
marked crosswalks or at stop signs and
lights (74 responses), distracted driving
(49 responses), speeding (46 responses),
and illegal or dangerous driving behaviors (26 responses). The most unsafe pedestrian and bicyclist behaviors included: pedestrians “jaywalking” or not using sidewalks and marked crosswalks
(52 responses), distracted or inattentive walking and biking (44 responses), cyclists failing to follow the rules of the road (24 responses), and cyclist failing to use the appropriate safety equipment (15 responses). Twenty-eight respondents indicated unsafe traffic behaviors related to issues with infrastructure and 13 respondents indicated safety concerns and issues with street harassment.
The top road safety tips identified included infrastructure (77 responses), education (70 responses), and enforcement (63 responses). The infrastructure responses (77 responses) included street crossing safety measures (34 responses), bike lanes, sidewalks, and trails (22 responses), and speed and traffic control measures (21 responses).
Lastly, personal behavior changes identified included: driving safely/following traffic laws (55 responses), avoiding distracted driving (49 responses), using marked crosswalks/crossing the 20 Packet Pg. 216 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Location Walk Bike Drive Total
Main St. 40 17 15 72
Freedom Blvd. 22 25 19 66
Everywhere 7 24 10 41
West/East Lake Ave 16 10 10 36
Green Valley Rd. 17 8 6 31
Beach St 13 3 10 26
Riverside Dr. 14 4 6 24
Airport Blvd 10 3 9 22
Schools 13 1 7 21
Rodriguez St. 14 1 3 18
Slough Trails/Ramsay Park/Harkins
Slough Rd.
11 4 2 17
Pajaro River Bridge/Porter St. Area 7 4 2 17
Walker St. 7 0 2 9
Clifford Dr. 4 0 3 7
Subtotal 195 104 104 403
Miscellaneous Locations 19 8 15 42
Total 214 112 119 445
TABLE A: WHERE RESPONDENTS FELT UNSAFE WALKING,
BIKING AND DRIVING
street safely (35 responses), following speed limits (28 responses), respecting pedestrians (22 responses), paying attention while walking (15 responses), using active transportation (11 responses), advocating for safety (8 responses), and using bike safety (7 responses).
The survey also asked about locations in Watsonville where respondents felt unsafe. These locations are divided by mode of transportation and can be found in TABLE A: Where Respondents Felt Unsafe Walking, Biking, and Driving. 21 Packet Pg. 217 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) The City of Watsonville hired Traffic Engineer Jeff Waller to assist with the analysis of 7 years of existing crash data collected through the Statewide Integrated Traffic Records Systems (SWITRS) from 2011-2017. Jeff Waller Consulting completed bicycle, pedestrian, and vehicle collision summaries. The analysis indicated peak hours and days of the week when injuries or fatal collisions were most prevalent and at which intersections these injuries or collisions predominantly occurred. Time of day most collisions occurred was between 3:00 pm and 5:59 pm at the following intersections where the highest number of collisions occurred: Airport/ Freedom, Freedom/Green Valley, and Green Valley/Main. Please see tables below .
APPENDIX II COLLISION DATA & ANALYSIS
22 Packet Pg. 218 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) The graph below incorporates combined data from collisions involving injuries (of all types) and fatalities among bicyclitsts, pedestrians, and vehicles from 2011-2017. There were 1061 collisions (injury or fatal). Types of injury and fatality collisions included: head on, sideswipe, rear end, broadside, hit object, overturned, vehicle/pedestrian, and other. There were 130 total bicyle collisions, 209 total pedestrian collisions, and 725 total vehicle collisions between 2011- 2017.4
23 Packet Pg. 219 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Jeff Waller Consulting Company compiled data below showing 130 total bicyclists collisions, including 4 fatalities and 126 injuries between 2011-2017.
Collision Summary
Bicyclist Collisions from 2011 - 2017
24 Packet Pg. 220 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Collision Summary
Pedestrian Collisions from 2011 - 2017
Jeff Waller Consulting Company compiled data below showing 209 total pedestrian collisions, including 6 fatalities and 203 injuries between 2011-2017. 25 Packet Pg. 221 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Jeff Waller Consulting Company compiled data below showing 725 total vehicle collisions, including 4 fatalities and 721 injuries between 2011-2017.
Collision Summary
Vehicle Only Collisions from 2011 - 2017
26 Packet Pg. 222 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program) Number of victims by Gender & age
2011 - 2017, Watsonville
Bike Collisions:
Pedestrian Collisions:
27 Packet Pg. 223 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
APPENDIX III THE IMPACT OF
TRAFFIC VIOLENCE ON THE CITY OF WATSONVILLE
28 Packet Pg. 224 Attachment: City of Watsonville Vision Zero Plan (4.1(b)--Grant Application - US Dept of Transportation Safe Streets & Roads For All Program)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Benton Field Runway and Taxiway Connector Pavement Preservation and Magnetic Variations Updates Project (Project):
(1) Adopt Resolution approving the submission of a California Department of Transportation grant application in the amount of $22,050 to be utilized as state match funding for the Project; and
(2) Authorize the City Manager, or designee, to execute the grant application, submit all subsequent documentation necessary to obtain grant funds for the project, and appropriate all grant funds received to the Airport Enterprise Fund.
Fiscal Impact
On August 16, 2022, City Council (Council) awarded Bid Schedule No. 5276 for construction of the Project. The Project will be funded by the Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grant in the amount of $490,000 which is proposed to be comprised of a federal share of $441,000 (90 percent), a state share of $22,050 (4.5 percent), and a local share of $26,950 (5.5 percent) to be funded through budgeted City of Redding (City) Airport funds. As proposed, the state share would be funded by the California Department of Transportation (Caltrans) and serve as a matching grant for the Project funding.
Alternative Action
The Council may choose to not approve the submittal of an application to Caltrans. Such actions may jeopardize future FAA funding in the following fiscal years and delay the project by at least a full year until another funding source can be identified. Future funding could require the standard 10 percent match.
MEETING DATE: September 6, 2022
ITEM NO. 4.2(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(a)--Adopt Resolution approving the submission of a grant application to the California Department of Transportation for Benton Airpark.
Steve Bade, Assistant City
Manager
Packet Pg. 225
Report to Redding City Council August 31, 2022
Re: 4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVARPage 2 Background/Analysis
This project was budgeted and awarded at the August 16, 2022, Council meeting. As part of that approval, staff inadvertently missed requesting the adoption of a resolution to apply for the Caltrans matching grant which could provide additional grant monies to cover the total cost of the Project.
The project includes the rehabilitation of the runway and taxiway connectors which will include removal of existing markings, surface preparation and cleaning, crack sealing and surface treatment. In addition, runway designation numerals and associated airfield signage will be updated.
This resolution has been approved to form by the City Attorney.
Environmental Review
On August 16, 2022, Council determined that the Benton Field Runway and Taxiway Connector Pavement Preservation and Magnetic Variations Updates Project is Categorically Exempt from environmental review under California Environmental Quality Act Guidelines, per Section 15301. December 11, 2018, the FAA determined that the Project is Categorically Excluded pursuant to FAA Order 1050.1F as it relates to the National Environmental Policy Act (NEPA) of 1969, as amended.
The application for additional grant funding is not a project defined under the California Environmental Quality Act (CEQA), and no further action is required by the City. Should additional grant funds be awarded by the FAA or Caltrans, each agency will conduct a NEPA review or revalidate its original findings.
Council Priority/City Manager Goals
• This agenda item is a routine operation item.
Attachments
^Resolution
Previous Staff Report 8-16-22
Packet Pg. 226
RESOLUTION NO. 2022-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
AUTHORIZING THE SUBMITTAL OF AN APPLICATION,
ACCEPTANCE OF AN ALLOCATION OF FUNDS AND EXECUTION OF
A GRANT AGREEMENT WITH THE CALIFORNIA DEPARTMENT OF
TRANSPORTATION, FOR AN AIRPORT IMPROVEMENT PROGRAM
(AIP) MATCHING GRANT
WHEREAS, the City of Redding and the Federal Aviation Administration are parties to federal AIP grant 3-06-0308-028-2022 for runway and taxiway connector pavement preservation and magnetic variations updates project at the Benton Field Airport; and WHEREAS, the California Department of Transportation, pursuant to the Public Utilities Code section 21683.1, provides grants of 5% of Federal Aviation Administration grants to airports; and
WHEREAS, the California Department of Transportation requires the City Council to adopt a resolution authorizing the submission of an application for an AIP Matching grant; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding, State of California:
1. Authorizes filing an application for a state AIP Matching grant for this project; and
2. Authorizes accepting the allocation of state AIP Matching funds for the project; and
3. Authorizes execution of an AIP Matching Grant Agreement for this project; BE IT FURTHER RESOLVED, that the City Council of the City of Redding does hereby authorize City Manager, or his designated representative, to sign any documents required to apply for and accept these subject funds on behalf of the City of Redding.
I hereby certify the foregoing resolution was introduced at the regular meeting of the City Council of the City of Redding on the 6th day of September, 2022, and was duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
KRISTEN SCHREDER, Mayor
ATTEST: FORM APPROVED:
PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 227 Attachment: ^Resolution (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Schedule No. 5276 (Job No. 9942) Benton Airpark Runway and Taxiway Connector Pavement Preservation and Magnetic Variations Updates Project (Project):
(1) Award to VSS International, Inc. in the amount of $378,120; (2) Approve an additional $81,540 to cover the cost of administration and inspection fees; and $71,000 for project development costs;
(3) Approve $38,000 to provide construction contingency funding; (4) Based on the facts in the record, make the finding that the Project is categorically exempt from review under the California Environmental Quality Act, per Section 15301 - Existing Facilities; and
(5) Find that the action is categorically excluded from review under the National Environmental Policy Act (NEPA) pursuant to FAA Order 1050.1F.
Fiscal Impact
The Benton Airpark Runway and Taxiway Connector Pavement Preservation and Magnetic Variations Updates Project (Project) is being partially funded by a Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grant. The construction will be paid for with the support of an FAA AIP grant in the amount of $490,000 which is comprised of a federal share of $441,000 (90%), a state share of $22,050 (4.5%), and a local share of $26,950 (5.5%). Project development costs, $71,691, were paid for with a previous FAA design grant.
The remaining portion of the project, $7,660, will be funded through budgeted City of Redding (City) Airport funds.
MEETING DATE: August 16, 2022
ITEM NO. 4.11(d)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(d)--Award Bid Schedule No. 5276 (Job Order No. 9942) Benton Airpark Runway and Taxiway Connector Pavement Preservation and Magnetic Variations Updates Project
Chuck Aukland, Public
Works Director
Packet Pg. 228 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR) Report to Redding City Council August 10, 2022
Re: 4.11(d)--Award Bid Schedule No. 5276 Benton Airpark Page 2 Cost Summary
Item Estimated
Project Development Costs $71,691
Construction Contract + Contingency $416,120
Contract Administration, Inspection, Testing $81,540
Total Project Costs $569,351
Project cost components are estimates, and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget. There is $610,000 budgeted for the total project.
Alternative Action
The City Council (Council) may choose not to award the bid for the Project, and provide staff with alternate direction. Without this Project, the pavement life will not be prolonged and future condition ratings could become unsatisfactory.
Background/Analysis
Attached is a tabulation of bids received and opened on March 22, 2022, for the Project. The low bid in the amount of $378,120 was received from VSS International, Inc., of West Sacramento, California. The engineer's estimate was $346,104. Total project development costs for this project are estimated to be $71,691that include engineering, surveying, right-of-way, environmental, consultant services, and permit fees. Staff intends to utilize Mead & Hunt, Inc. for construction management services with a fee of $68,540. In addition, $13,000 will be needed for City staff to complete construction administration associated with the project.
The Project includes the rehabilitation of the runway and taxiway connectors which will include removal of existing markings, surface preparation and cleaning, crack sealing and surface treatment. In addition, runway designation numerals and associated airfield signage will be updated.
Staff has determined that the Project qualifies as Categorically Exempt from environmental review under California Environmental Quality Act Guidelines, per Sections 15301. Class 1 exemptions include the operation, maintenance, repair, and minor alteration of existing public facilities. This maintenance project will be performed to extend and preserve the life of the existing pavement. The Project does not involve expansion of use, as the facility will have the same capacity. The Project has been reviewed for sensitive resources such as threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The Project has no potential to have a significant effect on the environment.
On December 11, 2018, the FAA made a determination that the Project is Categorically Excluded pursuant to FAA Order 1050.1F as it relates to the National Environmental Policy Act of 1969, as amended.
Packet Pg. 229 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR) Report to Redding City Council August 10, 2022
Re: 4.11(d)--Award Bid Schedule No. 5276 Benton Airpark Page 3 Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Bid Tabulation
^Location Map
^Notice of Exemption
^Letter FAA NEPA CE
Packet Pg. 230 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR) BID TABULATION FOR:
BENTON AIRPARK RUNWAY & TAXIWAY CONNECTOR PAVEMENT PRESERVATION & MAGNETIC VARIATIONS UPDATES Job No.: 9942 ENGINEER'S EST VSS International, Inc.
3/22/2022 UNIT UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Airfield Safety and Traffic
Control LS 1 $65,000.00 $65,000.00 $25,900.50 $25,900.50 2 Water Pollution Control LS 1 $3,500.00 $3,500.00 $2,140.00 $2,140.00 3 Contractor Quality Control
Program (CQCP LS 1 $8,500.00 $8,500.00 $5,000.00 $5,000.00 4 Mobilization LS 1 $31,000.00 $31,000.00 $42,576.00 $42,576.00 5 Engineer's Field Office LS 1 $8,000.00 $8,000.00 $2,140.00 $2,140.00 6 Removal of Pavement
Markings SF 18000 $1.50 $27,000.00 $1.61 $28,980.00
7 Crack Repair LF 11100 $2.50 $27,750.00 $2.70 $29,970.00 8 Emulsified Asphalt Slurry
Seal SY 27100 $4.25 $115,175.00 $3.80 $102,980.00
9 Pavement Markings,
White, Initial Application SF 3630 $1.90 $6,897.00 $3.10 $11,253.00 10 Pavement Markings,
Yellow, Initial Application SF 5490 $1.90 $10,431.00 $2.57 $14,109.30 11 Pavement Markings,
White, with Reflective
Media, Final Application SF 3630 $1.80 $6,534.00 $2.57 $9,329.10 12 Pavement Markings,
Yellow, with Reflective
Media, Final Application SF 5490 $1.80 $9,882.00 $1.71 $9,387.90 13 Pavement Markings,
Black, Single Application SF 9620 $1.75 $16,835.00 $0.91 $8,754.20 14 Airfield Signage Legend
Replacement EA 8 $1,200.00 $9,600.00 $10,700.00 $85,600.00 TOTAL - CONTRACT ITEMS $346,104.00 $378,120.00
Bid Schedule No.: 5276
Packet Pg. 231 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field BID TABULATION FOR:
BENTON AIRPARK RUNWAY & TAXIWAY CONN
Job No.: 9942
3/22/2022
ITEM DESCRIPTION UNIT QTY 1
Airfield Safety and Traffic
Control LS
1 2 Water Pollution Control LS
1 3
Contractor Quality Control
Program (CQCP LS
1 4 Mobilization LS
1 5 Engineer's Field Office LS
1 6
Removal of Pavement
Markings SF 18000
7 Crack Repair LF 11100 8
Emulsified Asphalt Slurry
Seal SY 27100
9 Pavement Markings,
White, Initial Application SF 3630
10 Pavement Markings,
Yellow, Initial Application SF 5490
11 Pavement Markings,
White, with Reflective
Media, Final Application SF 3630
12 Pavement Markings,
Yellow, with Reflective
Media, Final Application SF 5490
13 Pavement Markings,
Black, Single Application SF 9620
14 Airfield Signage Legend
Replacement EA
8 TOTAL - CONTRACT ITEMS
Bid Schedule No.: 5276
UNIT UNIT UNIT UNIT
PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL
Packet Pg. 232 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field
CITY OF REDDING
LOCATION MAP
EXHIBIT A
PUBLIC WORKS
DEPARTMENT
Packet Pg. 233 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR) Packet Pg. 234
Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR) Packet Pg. 235 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR) Packet Pg. 236 Attachment: Previous Staff Report 8-16-22 (4.2(a)--Resolution for Grant Application for Benton Field Runway Preservation/MAGVAR)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following:
(1) Authorize submission of a grant application to the United States Economic Development Administration’s Public Works and Economic Adjustment Assistance Program in the amount of $9,193,862 to support Block 7 Project infrastructure improvements to the California-Market Alley, Butte Street, and Yuba Street; and (2) Based on the facts in the record, make the findings that the subject action is categorically exempt under California Environmental Quality Act Guidelines Section 15302. The project area does not have significant values for wildlife habitat or other environmental resources, and the project has no potential to have a significant effect on the environment; and the project will not result in a significant impact on the quality of the human environment under the National Environmental Policy Act, Environmental Assessment (24 CFR Part 58.36), Finding of No Significant Impact [24 CFR 58.40(g)(1); 40 CFR 1508.27]
Fiscal Impact
Authorizing a grant application to the United States Economic Development Administration’s (EDA) Public Works and Economic Adjustment Assistance (PWEAA) Program may result in a grant award of up to $9,193,862 with 50 percent required local matching funds. Median household income, poverty indicators, indicators of economic distress, and disadvantaged community statuses may reduce the required local match to a 20 percent minimum. The combined project funding to date, including the California Department of Housing and Community Development (HCD) Affordable Housing and Sustainable Communities (AHSC) grant, other local funding sources already committed to this project, and in-kind contributions, already meet the threshold of the required 50 percent local match; therefore, no additional funds will need to be committed in order to satisfy matching funds requirements.
MEETING DATE: September 6, 2022
ITEM NO. 4.2(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(b)--Authorize Grant Application to the U.S. Economic Development Administration Public Works and Economic Adjustment Assistance Programs Steve Bade, Assistant City
Manager
Packet Pg. 237
Report to Redding City Council August 31, 2022
Re: 4.2(b)--Authorize Grant Application Page 2
Alternative Action
The City Council may choose not to authorize a grant application to the EDA PWEAA Program.
This action would direct staff to identify alternative funding sources to assist with the remaining Block 7 Project infrastructure work associated with the California Market Alley, Butte Street, and Yuba Street.
Background/Analysis
The EDA is an agency of the United States Department of Commerce which administers programs that are intended to boost economic development as measured by job creation and retention. Economic Adjustment Assistance is a flagship program of the EDA and offers funding to projects that align with regional economic plans and are expected to create or retain highquality, well-paying jobs. The PWEAA Program also recognizes the role that infrastructure and public works facilities can play in economic development at the regional and local levels. Public works projects that serve to provide economic access are eligible for investment from the EDA; these infrastructure projects create jobs by improving workforce access or commercial development in a given area, and each is scored by its alignment with regional economic planning efforts.
The Block 7 Project in Downtown Redding is a public-private partnership to uplift a previously economically underutilized area by replacing what was originally a parking lot stretching nearly three city blocks with a multi-level parking garage (already completed), complete streets (in construction), commercial spaces (in construction), and income-qualified and market-rate housing (in construction). The completed streets and increased mobility through this downtown space are of particular interest as the City of Redding (City) works to create a more walkable and livable downtown area that is conducive to greater economic growth along the corridor of the California-Market Alleyway. This development also builds off of the successful redevelopment of Market Street through the Market Center project and the Downtown Streets Circulation Project, both of which have received recognition at the State and industry level.
The focus of the EDA PWEAA Program grant application will be the build-out of infrastructure related to the complete streets portion of the project and the class four cycle track along California Street. These infrastructure enhancements, together, will boost economic access to the new developments of the Block 7 project and enable the job creation and retention that is expected to occur in this area. Of the requested $9,193,682 almost half will be dedicated to the completion of the class four cycle track on California Street which will enhance mobility and connectivity of this area with other areas of the City served by dedicated cycle tracks, trails, and dedicated bicycle lanes while the remaining funds will be dedicated to completing the buildout of the complete streets infrastructure along Butte and Yuba Streets and the California-Market Alley.
While construction of the complete streets is already underway, the additional funding would enable a full build-out of the proposed infrastructure and adherence to the vision of reimagining this space as a model for future growth in downtown Redding.
Environmental Review
Staff has determined that the anticipated scope of work associated with the potential grant qualifies as Categorically Exempt under California Environmental Quality Act Guidelines Section 15302. Class II exemptions include the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. The Packet Pg. 238
Report to Redding City Council August 31, 2022
Re: 4.2(b)--Authorize Grant Application Page 3
Project has been reviewed for sensitive resources such as threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources.
The project has no potential to have a significant effect on the environment.
The City of Redding finds that the project will have no significant effect on the quality of the human environment. In several areas, implementation of City and other agency required measures during construction, along with other conditions required for City approval of the project, will not only result in the project having no significant impact on the quality of the human environment but will have a beneficial impact in several areas such as improving the visual aesthetics of the area. Staff has made the determination of no significant impact as it relates to the National Environmental Policy Act of 1969, as amended.
Council Priority/City Manager Goals
• Budget and Financial Management – “Achieve balanced and stable 10-year Financial Plans for all funds.”
• Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
• Economic Development – “Facilitate and become a catalyst for economic development in Redding to create jobs, retain current businesses and attract new ones, and encourage investment in the community.”
Packet Pg. 239
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the City Manager or designee, to approve the procurement of a new access control system for Redding Electric Utility locations deemed as medium impact locations, based on standards as set forth by North American Electric Reliability Corporation (NERC), in a not to exceed amount of $60,000.
Fiscal Impact
Redding Electric Utility (REU) will procure a new access control system for the secured areas that meets the medium impact standards set forth by NERC. Selection of the replacement system will be based on its ability to meet NERC requirements, availability, and City of Redding Purchasing Department approval. The cost of the new system is anticipated not to exceed $60,000. Staff will repurpose the existing system at other City facilities to help offset costs.
Alternative Action
The City Council (Council) could choose to not authorize the system change at the secured facilities and provide alternative direction to staff.
Background/Analysis
On February 7, 2020, NERC directed REU to register as a Transmission Owner and Transmission Operator (TO/TOP). Since that time, REU has worked closely with the Western Electricity Coordinating Council (WECC) in order to implement and comply with 147 new standards before the final deadline of November 2022.
MEETING DATE: September 6, 2022
ITEM NO. 4.3(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.3(a)--Transmission Owner and Transmission Operator (TO/TOP) Medium Impact Access Control System
Tony Van Boekel, Chief
Information Officer/IT
Director
Packet Pg. 240
Report to Redding City Council August 30, 2022
Re: 4.3(a)--TO/TOP Medium Impact Access Control System Page 2 Due to the number of new standards and strict timeline, REU requested approval for the Council to grant the City Manager, or designee, the authority to sole-source the procurement of software, hardware, and service agreements relating to REU’s operations as a TO/TOP registration based on recommendations by the expert consultants assisting with the implementation. This request was approved at the March 16, 2021, Council meeting.
One of the new standards requires a physical access control system to be implemented at any REU medium impact facility. In early October 2021, the City of Redding (City) issued a Purchase Order for an access control system (Avigilon Access Control Manager (ACM)) using the aforementioned sole-source authorization, understanding of the standard requirements at that time, and vendor information stating they were compliant with NERC standards. The installation of the access control system was completed in February 2022.
Since that time, it has been discovered that there are two requirements specific to NERC medium standards, that Avigilon ACM cannot, and will not, accommodate. As such, a new system is required in order to fully comply with the NERC medium standard prior to November 2022.
Failure to do so could result in a fine of $1.6 million dollars per day, per offense.
Since the Council approved the City to sole-source the Avigilon ACM as a City-wide solution for current and future physical access control needs on December 21, 2022, the City will be able to repurpose the equipment from the secure facilities to other City locations/facilities. Avigilon ACM is compliant with DOJ, NERC low standards, and can meet the needs of the majority of the City. The Information Technology Department will work to standardize on the Avigilon ACM with the exception of facilities where the system is deemed non-compliant based on supplemental governing regulations or standards.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required
Council Priority/City Manager Goals
This is a routine operational item.
Packet Pg. 241
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions related to repairs at the Redding Power Plant:
(1) Approve the sole-source purchase of three replacement Continuous Emission Monitoring Systems from Custom Instrumentation Services Corporation in an amount not to exceed $532,000 for generating Units 1, 2, and 3 at the Redding Power Plant; (2) Authorize the City Manager, or designee, to execute agreements and approve expenditures up to $40,000 for unforeseen issues that may arise; and (3) Find that the project is categorically exempt from review under the California Environmental Quality Act (CEQA) pursuant to Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction).
Fiscal Impact
Per Custom Instrumentation Services Corporation (CISCO) Proposal 37477, the total cost of equipment, installation, and commissioning services is approximately $532,000. In addition, $40,000 is needed for unforeseen issues and contingency. The total estimated project cost is $572,000. Adequate funds are available within Redding Electric Utility’s (REU) Major Maintenance Fund for this project. Major maintenance funding is available by eliminating future work that was planned but is now rendered unnecessary because of increased unit operation and cost savings realized from projects completed in Fiscal Year 2021-22.
This project was initially scheduled for Fiscal Year 2024-25; however, over the past 18 months, the need to implement this project has increased due to component degradation. The Continuous Emission Monitoring Systems (CEMS) system is required during turbine operation to monitor the air emissions and meet regulatory air quality requirements.
MEETING DATE: September 6, 2022
ITEM NO. 4.5(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.5(b)--Authorize the Sole-Source Procurement of replacement Continuous Emissions Monitoring Systems from Custom Instrumentation Services Corporation for Redding Power Plant generating Units 1, 2, and 3.
Nick Zettel, Director of
Redding Electric Utility
Packet Pg. 242
Report to Redding City Council August 30, 2022
Re: 4.5(b)--Peaking Generator CEMS Replacement Page 2
Alternative Action
The City Council could reject the recommendation and require staff to issue a Request for Bids, which would extend the purchasing timeframe, incur significant implementation costs, and result in additional operational risks for generating Units 1, 2, and 3 if CISCO is not the successful low bidder.
Background/Analysis
A gas turbine continuous emission monitoring system is critical equipment without which the turbine cannot meet air quality permit requirements. A CEMS consists primarily of sample probes, heated sample lines, programmable logic controllers (PLC), a shelter that houses analyzers, and a sample treatment system.
The systems for generating units 1, 2, and 3 have operated beyond the recommended lifespan, and the recent trend indicates that the system reliability is degrading at a greater rate than anticipated. The CEMS shelter foundations and floors are beginning to wear. Vibrations from the turbine during operation cause the shelters to vibrate, which has damaged two emissions analyzers over the past year and has subsequently required repairs. Analyzers cost approximately $12,000, and repairs for each incident are approximately $5,000. Also, leaks have begun to develop in the shelter roofs, which became apparent during winter 2021. Leaking water in one of the shelters damaged the PLC equipment requiring the replacement of portions of the electrical termination rack.
Reliability is also a concern as components continue to age. Specific components, such as the heated sample line, are costly and have longer lead times. Unexpected failure due to the exposure to corrosive exhaust gases would result in extended generating unit downtime. Staff recommends replacing all CEMS system components operating past its useful life simultaneously to decrease the total cost of implementation.
CISCO provided CEMS for combined cycle Units 5 and 6 and the plant-wide Data Acquisition & Handling System (DAHS), the software, and infrastructure supporting emissions data. CISCO installed and continues to service this infrastructure, which gives it an extensive working knowledge of the REU power plant systems and an in-depth understanding of facility requirements. Sole sourcing to CISCO ensures seamless integration of the new CEMS equipment into the existing CISCO infrastructure that is already in place at the Power Plant.
Sole-source of this equipment will provide the best value to the City. Items affecting cost and reliability if another vendor is selected include but are not limited to:
• Sole-source will match equipment already in use at the Power Plant. A non-CISCO system will have non-matching equipment requiring a separate spare parts inventory, thereby increasing the number and cost of spare parts that would need to be kept at the Power Plant warehouse. Uniform spare parts help ensure system reliability. • Integrating data from a new vendor’s equipment into the existing CISCO DAHS and the Siemens T3000 Distributed Control System will still require CISCO’s involvement to review and approve all equipment designs since it must integrate with the DAHS, which controls the equipment operation.
Packet Pg. 243
Report to Redding City Council August 30, 2022
Re: 4.5(b)--Peaking Generator CEMS Replacement Page 3
• Outage time for Generating Units 1, 2, and 3 during installation would be extended.
Complexities involved in integrating a non-CISCO system will require more time for installation and commissioning of new equipment.
• The bid process, design, and long-lead-time for parts predict an extended project timeframe. Changing vendors is estimated to increase the project execution timeline by approximately twelve months.
o This extension is a reliability concern because the equipment is already due for replacement.
o CISCO has equipment readily available and is familiar with plant equipment and operation. CISCO was involved in the Peaker sample probe redesign in 2014 and has since been engaged in periodic troubleshooting and equipment repair. o A new vendor will be required to develop a plan for implementing its technology at the plant, which will result in additional costs and time for the project. These projected costs are expected to be much higher than the CISCO quote already in hand due to inflationary pressures.
• Staff will require training in the operation and maintenance of new equipment. Uniform equipment will help ensure system reliability and reduce operator errors and compliance violations.
Environmental Review
This project is categorically exempt from CEQA per State CEQA Guidelines Sections 15301 and 15302 because it is the replacement of existing equipment with like-kind.
Council Priority/City Manager Goals
This is a routine operational item.
Attachments
CiSCO Proposal 37477-R3 - City of Redding CEMS Replacement PowerPoint Peaking Plant CEMS Slides
Packet Pg. 244
CUSTOM INSTRUMENTATION
SERVICES CORPORATION
City of Redding - CEMS Replacement
Redding, California July 19, 2022
Overview:
A. Stack Sample Systems
Qty Comments
3 Stack Heated Sample Lines
Add/Subtract if Different than
100 feet in Base Scope of
Supply +/- $48/ft
3 Shared between Stack and SCR
systems
3 B. SCR Sample Systems
Qty Comments
3 3
SCR Heated Sample Lines
Add/Subtract if Different than
100 feet in Base Scope of
Supply +/- $41/ft
3 All necessary pumps, dryers, and other equipment for a Dry Extractive CEMS Sample System
Description
All necessary pumps, dryers, and other equipment for a Dry Extractive CEMS Sample System
CiSCO EP-750HT Sample Probe with a 4” SS Flange and a 310SS Insertion Tube
One Hundred (100) feet of Heated Sample Line at the SCR Inlet Stainless Steel Sample Tube, Teflon Calibration Tube and TriConductor Cord for Probe Power Scope & Price
Includes the replacement of the existing Stack and SCR Inlet NOx Sample Handling Systems. Existing Stack Probes and Analyzers will be reused. The new equipment will be incorporated into the existing Data Acquisition and Handling System (DAHS) to report the measurements to meet Local, 40CFR60 Subpart KKKK Monitoring and Reporting Requirements for the City of Redding Power Plant located in Redding, California.
Description
Proposal #37477 - Rev 3
Dual Channel Thermo-Electric Sample Dryer
One Hundred (100) feet of Heated Sample Line at the Stack containing a Stainless Steel Sample Tube, Teflon Calibration Tube, Poly Backflush Line and Tri-Conductor Cord for Probe Power Proposal #37477-R3 City of Redding - CEMS Replacement Page 1 of 5 Packet Pg. 245 Attachment: CiSCO Proposal 37477-R3 - City of Redding CEMS Replacement (4.5(b)--Peaking Generator CEMS Replacement) C. Control/PLC:
Qty Comments
3 Option to re-use existing PLCs
& OITs included in Section N
3 3
D. Shelter
Qty Comments
3 Description
The System will be packaged in an All-Metal, Insulated, Pre-Tubed and Pre-Wired Walk-In, Climate-Controlled, Shelter. The Shelter will measure approximately 10 feet deep by 10 feet wide by 9 feet high. Ceiling Height will be 8 feet. The Shelter is mounted on a Steel C-Channel base for direct placement on a concrete slab.
Structure is all welded steel. Shelter floor is 3/16” Steel plate, welded to floor stringers and covered with Industrial Non-Skid, NonConductive, Vinyl Tile. External & internal skin is fabricated from formed Galvalume steel panels with a factory baked on Kynar 500 coating carrying a limited 20-year warranty on the finish. One 3’-0” by 7’-0” Lockable Door with Panic Exit Hardware, Closure and Safety Glass Window is provided for access. A Workbench/Desk, a Smoke Detector and a Fire Extinguisher are provided.
Description
An Allen Bradley CompactLogix Programmable Logic Controller (PLC) provides for System Control, Plant Discrete Signal Interface, Backup Data Storage and a 100BaseFX TCP/IP Communications Link with the DAHS/Plant. Automatic System Calibration through the Sample Probe with Calibration Fail Alarms & Calibration Error Correction Factors and Linearity/CGA Testing are Controlled with this PLC. System Alarms are monitored by the PLC for display on the OIT/DAHS and logging/reporting in the DAHS.
Ethernet/Media Converter and Fiber Optic Patch Panel with multiple drops and Fiber Patch Cables (external cables supplied by others)
Touchscreen HMI on the Ethernet Communications Link with the PLC provides for Operator Interface with the CEM System in the Shelter. System Alarms are monitored by the PLC for display on the HMI/DAHS and logging in the DAHS.
Proposal #37477-R3 City of Redding - CEMS Replacement Page 2 of 5 Packet Pg. 246 Attachment: CiSCO Proposal 37477-R3 - City of Redding CEMS Replacement (4.5(b)--Peaking Generator CEMS Replacement) E. Calibration
Qty Comments
0 Site to provide cylinders.
Options for new shared or
individual calibration
equipment provided in Sections
O and P
F. Climate Control
Qty Comments
3 G. Electrical
Qty Comments
3 H. CiSCO CeDAR - Data Acquisition and Handling System (DAHS) Base Equipment Price (A-H Above) $ 418,300
Description
The new equipment will be integrated into the existing CeDAR DAHS software.
DAHS and PLC configuration will be changed so that Stack and SCR Inlet systems sample simultaneously.
A Safety Disconnect Switch and 30 kVA Step-Down 480-208/120 Volt Transformer are provided for connection to a Plant Supplied 480 Volt 3-Phase Power Feed. A 208/120 Volt, 3-Phase Power Distribution Sub-System is provided inside the Shelter for all System Components. Utility Outlets, Internal Surface Mounted LED Lighting, Exit/Emergency Light and an External LED Light on a Photocell for Outside Door Lighting are provided. All Power Wiring is per NEC 2020 and is enclosed in Surface Mounted EMT Conduit.
The existing Cylinder Rack, Regulators and Connection hardware as well as the tubing to each shelter location will be re-used.
Description
A Commercial Wall-Mounted Heating, Ventilation and Air
Conditioning (HVAC) unit with Thermostat for Climate Control. Up to 25% fresh air ventilation can be obtained by adjusting the fresh air intake damper on the unit. Floor & Walls are insulated with LTTR 18.5 Insulation.
Description
Proposal #37477-R3 City of Redding - CEMS Replacement Page 3 of 5 Packet Pg. 247 Attachment: CiSCO Proposal 37477-R3 - City of Redding CEMS Replacement (4.5(b)--Peaking Generator CEMS Replacement) I. Services
$ 3,885
$ 3,000
$ 28,620
J. Documentation
System Drawings for Review and Final Included in Base Scope 3 Printed, 1 CD O&M Included in Base Scope
Additional Printed O&M Manuals $350/ea
Additional DARS User’s Manuals $250/ea
Additional O&M Manual CDs $100/ea
QA/QC Document Updates $ 1,000
K. Shipping Charges
$ 9,500
L. Commercial
Base Contract Estimate (A-L Above) $ 464,305
Shipping is Included
M. Option: Rackmount UPS
Qty Comments
3 Addition to Base Contract Price $ 11,875
N. Option: Re-Use PLC & OIT
Qty Comments
3 Reduction to Base Contract Price $ (26,180)
Standard Warranty of Eighteen (18) Months after Delivery or Twelve (12) Months after Acceptance whichever occurs first, Freight & Insurance Prepaid & Add, Terms Net 30 Days, 10% of Base Material Price Progress Payment on acceptance of drawings, 25% of Base Material Price on receipt of analyzers by CiSCO, 55% of Base Material Price on Delivery of the Systems, Final 10% Due upon Substantial Completion of all CEMS Documentation. Base Material Price defined as Contract Price minus Freight and Field Services. Freight and Field Services are due 100% Net 30 Days upon completion of each. All Labor and Expenses to Design, Program, Document, Assemble and Factory Test Systems and Start-Up Spares are included.
Startup & Comissioning - Two technicians onsite simultaneously.
Two (2) Trips and Twelve (12) Days.
Freight to Site - DAP Jobsite.
Description
A Rack Mounted, 3kVA UPS with Battery Backup is included to provide power to critical system components
Description
Re-use the existing PLCs and OIT panels. All existing PLC and OIT hardware will be transferred during startup. Pricing includes extra time needed for transfer of Hardware.
Three Day FAT in Englewood, CO
Site Walkthrough. One (1) Trip, One (1) Day
Proposal #37477-R3 City of Redding - CEMS Replacement Page 4 of 5 Packet Pg. 248 Attachment: CiSCO Proposal 37477-R3 - City of Redding CEMS Replacement (4.5(b)--Peaking Generator CEMS Replacement) O. Option: Replace Existing Calibration Gas Equipment (Shared between Units) Qty Comments
1 Cylinders not included.
Requires audit cylinders to be
swapped out for each gas type.
1 Shared between all three units.
Daily Cylinder Regulators (Qty
5) include Pressure Switches.
Addition to Base Contract Price $ 12,800
P. Option: Individual Calibration Equipment
Qty Comments
3 Cylinders not included
3 Daily Cylinder Regulators (Qty
15) include Pressure Switches
Addition to Base Contract Price $ 50,400
Q.
10-Hr Day Monday - Saturday $ 2,000
10-Hr Day Sunday & Holiday $ 3,560
8-Hr Day Monday - Saturday $ 1,575
8-Hr Day Sunday & Holiday $ 2,710
Per Man-Trip $ 2,310
Prices valid for ninety (90) days from date of proposal Includes all expenses except travel to and from the jobsite. For any additional Field Time required.
Description
An Eleven (11) Position Cylinder Rack will be mounted outside each Shelter to store One Set of Daily calibration Gas Cylinders Includes all expenses and labor. For any additional trips required.
Description
A Seven Position Cylinder Rack will be mounted outside the Unit 2 Shelter to store One Set of Daily calibration Gas Cylinders and a pair of Audit Cylinders.
Seven (7) Bar-Mounted Dual-Stage, SS, High Pressure Calibration Gas Cylinder Regulators and Connection Hardware are included for the System to support Automatic Daily Calibration as well as Quarterly Audits
Per Diem Field Service Rates
Round Trip to/from Jobsite
Eleven (11) Bar-Mounted Dual-Stage, SS, High Pressure Calibration Gas Cylinder Regulators and Connection Hardware are included for the System to support Automatic Daily Calibration as well as Quarterly Audits
Proposal #37477-R3 City of Redding - CEMS Replacement Page 5 of 5 Packet Pg. 249 Attachment: CiSCO Proposal 37477-R3 - City of Redding CEMS Replacement (4.5(b)--Peaking Generator CEMS Replacement)
PEAKING PLANT CEMS
Packet Pg. 250 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS POINTS OF DISCUSSION Purpose and critical nature of equipment • Continuous Emissions Monitoring to maintain compliance with air quality permit limitations. • Without a functional CEMS the Units cannot run. Age / Useful life of equipment • Equipment is 20+ years old. Items such as heated sample line are typically replaced at 15. • Certain features of system are outdated or no longer operational. • Certain components are becoming increasingly difficult to repair/service Packet Pg. 251 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS
POINTS OF DISCUSSION
Reliability and Cost
• Reliability will decrease as system continues to degrade. • Failure of long lead time components, such as the heated sample line, will result in extended downtime. • Project cost will increase as time passes due to inflation. • Replacing all outdated CEMS components simultaneously will decrease cost of lost operation time and difficulty of replacing components separately. Sole Source Justification
• Equipment will match what is already in use. Spare parts inventory will match. No additional training. Reduced operator error. • Integration of new equipment into existing DAHS “Data Acquisition Handling System” will be greatly simplified. Aspects of integration will require CiSCO regardless. • A single support agreement can be maintained for equipment and software. • Duration of unavailability during installation will be decreased. • Project timeframe will be reduced by approximately 12 months.
Packet Pg. 252 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS
DEGRADATION
Increased rate of Degradation
• Degradation of shelter resulted in multiple downtimes over the last year Analyzers were damaged due to shaking on two separate occasions. Flooring and structural supports have deteriorated. Both incidents forced the unit to come offline. On each occasion the cost to repair the analyzer was $5000.
Portions of the PLC electrical termination rack were damaged after water leaked through holes in the roof. The unit became unavailable and the equipment was replaced. Packet Pg. 253 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS
SYSTEM OVERVIEW
Packet Pg. 254 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS
INTERNAL COMPONENTS
Packet Pg. 255 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS
EXTERNAL COMPONENTS
Packet Pg. 256 Attachment: PowerPoint Peaking Plant CEMS Slides (4.5(b)--Peaking Generator CEMS
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Approve the First Amendment to Caldwell Recreation Center Lease (C-7389) with Turtle Bay Exploration Park (Turtle Bay) to extend the term for an additional three years at Caldwell Recreation Center to store artwork and artifacts, with a term expiring September 26, 2025.
Fiscal Impact
There will be no new fiscal impact to the General Fund should the City Council (Council) approve the amended lease agreement with Turtle Bay.
Alternative Action
The Council could decline to approve the lease amendment with Turtle Bay. This action would create a hardship for Turtle Bay which lacks adequate archival storage for its collection, including historical artifacts and art collections. The Council could provide staff with alternate direction.
Background
The Caldwell Recreation Center, which previously housed the Redding Museum of Art and History, includes a large area designed for archival storage. The room is equipped with a climate control system that provides for constant temperature and humidity. In 2003, Turtle Bay Exploration Park moved to its current location. Since then, the City has leased Turtle Bay approximately 3,900 square feet of the Caldwell Recreation Center to store artwork and artifacts.
Although no rent is paid, Turtle Bay Exploration Park pays all utility, HVAC maintenance, and pest control costs associated with its use.
MEETING DATE: September 6, 2022
ITEM NO. 4.6(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.6(a)--Approve the First Amendment to Lease C-7389 at the Caldwell Recreation Center with Turtle Bay Exploration Park, extending the term by three years.
Kim Niemer, Community
Services Director
Packet Pg. 257
Report to Redding City Council August 31, 2022
Re: 4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at Caldwell Recreation Center Page 2
The remainder of the building is program space for Redding Recreation which uses the building extensively for summer camps, classes, and other programming. Redding Recreation needs more program space and could host more offerings when the space becomes available. Turtle Bay hopes to construct its own storage area in the future.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
Attachments
First Amendment to Caldwell Recreation Center Lease with Turtle Bay Exploration Park (C7389) Caldwell Recreation Center Lease Agreement (C-7389)
Packet Pg. 258
Packet Pg. 259
Attachment: First Amendment to Caldwell Recreation Center Lease with Turtle Bay Exploration Park (C-7389) (4.6(a)--Approve Lease
CITY OF CITY OF REDDING
RED D- ootri'
777 CYPRESS AVENUE, REDDING, CA 96001
CALIFORNIA/ P.O. Box 496071, REDDING, CA 96049-6071
OFFICE OF THE CITY CLERK
PAMELA MIZE, CITY CLERK
SARAH SHEETZ, ASSISTANT CITY CLERK
530.225.4447
530.225.4463 FAX
September 26, 2017
Turtle Bay Exploration Park
Attn: CEO
1335 Arboretum Drive, Suite A
Redding, CA 96003
SUBJECT: Caldwell Recreation Center Lease Agreement, C- 7389 Enclosed is a fully executed original of the above subject Agreement between the City of Redding and Turtle Bay Exploration Park for the purpose of leasing a portion of the Caldwell Recreation for storage purpose.
If you have any questions regarding this matter, or if we can be of assistance, please contact the Office of the City Clerk at ( 530) 225- 4439.
Sincerely, (
au,k, 6,kp_S
Anette Cates
Executive Assistant
Enclosure
c: Michele Davis/ Community Services
Finance
Packet Pg. 260 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
CITY OF CITY OF REDDING
RED777 CYPRESS AVENUE, REDDING, CA 96001
CALIFORNP.O. Box 496071, REDDING, CA 96049-6071
OFFICE OF THE CITY CLERK
PAMELA MIZE, CITY CLERK
SARAH SHEETZ, ASSISTANT CITY CLERK
530.225.4447
530.225.4463 FAX September 26, 2017
A-050-055AS/ C-070- 100
Leslie Morgan, Assessor- Recorder
Shasta County Assessor' s Office
1450 Court Street, Suite 208
Redding, CA 96001
Dear Ms. Morgan:
Enclosed herewith is the following Lease Agreement for Possessory Tax purposes:
C-7389 Lease Agreement at Caldwell Recreation Center by Turtle Bay Exploration Park.
If you have any questions regarding this matter, please feel free to contact our office at 225- 4439.
Sincerely,
b
Anette Cates
Executive Assistant
enclosure
Packet Pg. 261 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
CALDWELL RECREATION CENTER LEASE
THIS LEASE is made by and between the City of Redding, a municipal corporation Lessor"), and Turtle Bay Exploration Park, a California Non- profit public benefit corporation (" Lessee"):
RECITALS
A. Lessor is the owner of certain real property located in the City of Redding located in Caldwell Park commonly known as the Caldwell Recreation Center Recreation Center") as shown on Exhibit A and Exhibit B, attached hereto and incorporated herein by this reference.
B. Lessee is a non-profit corporation dedicated in part to promoting cultural and educational programs for the City and residents of Shasta County.
C. Lessee has leased 3, 900 square feet of storage space within the freestanding single- story Recreation Center since 2003, and wishes to lease the space for a further term of five( 5) years. " Turtle Bay Storage" shall hereinafter be referred to as" the Premises".
THEREFORE, for and in consideration of the mutual promises, covenants, considerations and conditions hereinafter set forth, the parties agree as follows:
1. TERM O F LEASE
A. This Lease shall commencing on the date of the Agreement for a term of five ( 5) years unless sooner terminated as herein provided.
B. If Lessee should be adjudged bankrupt either by voluntary or involuntary proceedings, or abandon or vacate said premises or make an assignment for the benefit of creditors, or if said demised premises should come into possession and control of any trustee in bankruptcy, or if any receiver should be appointed in any action or proceeding with power to take charge, possession, control or care of said premises, Lessor shall have the option to forthwith terminate this Lease and to reenter the said premises and take possession thereof. In no event shall this Lease be deemed an asset of Lessee after adjudication in bankruptcy.
C. Lessor and Lessee shall each retain the right to cancel this Lease without cause upon twelve ( 12) months written notice to the other party in advance.
W
Packet Pg. 262 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
2. CONSIDERATION
The City of Redding affirms its recognition of the importance of Lessee' s programs and activities to the cultural, educational and economic well- being of the City and its residents.
Therefore, in consideration of the value of such programs, the City of Redding shall provide to Lessee said premises rent-free under the terms and conditions stated herein.
3. USE OF PREMISES
A. The premises shall be used by Lessee solely for storage and administrative purposes and shall comply with and conform to all laws, and ordinances and regulations applicable to the demised premises.
B. Lessor, or its agents, shall have the right on reasonable occasions to enter into any part of said premises to ascertain and inspect their condition and for maintenance, custodial or security purposes.
4. MAINTENANCE AND REPAIRS
Daily routine maintenance and custodial tasks inside Lessee' s assigned area shall be the responsibility of, and at the expense of, Lessee. Lessee shall reimburse Lessor for materials related to routine maintenance of the heating and air conditioning units. If equipment or structural repairs on the Recreation Center are needed, Lessor' s Community Services Department— Building Maintenance Division shall be notified. Lessor will make the determination of the needed repair and or renovation. Lessor shall be responsible for structural repairs to the building, excluding tenant improvements.
5. ALTERATIONS AND IMPROVEMENTS
Lessee shall not make any structural or exterior alterations to the premises without Lessor' s prior written consent. Lessee will abide by any and all conditions whatsoever by Lessor' s Community Services Director, or his or her designee, prior to commencing any structural or exterior alterations work. Lessee may make minor nonstructural alterations of the interior without Lessor' s consent.
6. SIGNS
Lessee shall not place, construct, or maintain any permanent sign, advertisement, awning, banner or other exterior decorations without Lessor' s prior written consent.
7. SECURITY
The Lessee shall assume the cost and maintenance of a security system within said premises for assigned areas.
Packet Pg. 263 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at Packet Pg. 264 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
8. LANDSCAPE MAINTENANCE
Landscaping and grounds maintenance in the park areas adjacent to the leased premises shall be provided by the Lessor
9. PEST CONTROL
The Lessee shall assume the cost of pest control within said premises for assigned areas.
10. HAZARDOUS MATERIALS
Lessee shall not store, generate, treat or dispose of any hazardous substances or hazardous waste, as defined in the California Health and Safety Code, on the Premises.
A. Hazardous materials include, but are not limited to:
1. Substances which are flammable, explosive, corrosive, radioactive, toxic;
2. Any material or substances defined as hazardous substances, hazardous materials, toxic substances, or hazardous wastes in the Comprehensive Environmental Response, Compensation and Liability Act of 1980 ( 42 U. S. C.
Sections 9601, et. seq.), the Hazardous Materials Transportation Act(49 U.S. C.
Sections 1801 et. seq.), the Resource Conservation and Recovery Act(42 U.S. C.
Sections 6901 et. seq.), the Hazardous Waste Control Act (California Health & Safety Code Section 25100 et. seq.), and the Hazardous Substance Account Act California Health & Safety Code Sections 25300 et. seq.), the California Hazardous Waste Management Act ( California Health & Safety Code Sections 25170. 1, et. seq., California Health and Safety Code Section 25280, et. seq., ( Underground Storage of Hazardous Waste Management Act), California Health and Safety Code section 2550, et. seq. ( Hazardous Materials Release Response Plans and Inventory), or the California Porter-Cologne Water Quality Control Act, Water Code Section 13000, et. seq., and all amendments to these laws, and regulations adopted or publications promulgated pursuant to these laws;
3. Those asbestos- containing materials defined and described in Environmental Protection Agency Report No. 56/ 5- 85- 024 ( June 1985) whether or not friable, or any related or successor report, or other applicable government regulations defining or describing such materials;
4. Pesticides as defined by Section 136( u) of FIFRA (7 U. S. C. Section 136) as may be present in soil or groundwater;
5. " Hazardous wastes" as defined in Section 25117 of the California Health and Safety Code, or as a chemical that is known to the State of California " to cause cancer or reproductive toxicity" under the Safe Drinking Water and Toxic Enforcement Action of 1986, California Health and Safety Code sections 25249.5, et. seq.; and
Packet Pg. 265 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
6. Hazardous materials, substances or waste, or toxic materials, substances or waste as those terms or similar terms are defined by any other federal, state or local law or regulation or orders.
B. Lessee agrees to indemnify, protect, hold harmless, and defend the City, its elected officials, officers, employees, agents and volunteers from and against any and all liability, including without limitation, ( 1) all foreseeable and unforeseeable consequential damages, directly or indirectly arising from the use, generation, storage, or disposal of hazardous materials by Lessee, and ( 2) the cost of any required or necessary repair, cleanup, or detoxification and the preparation of any closure or other required plans, to the full extent that such liability is attributable, directly or indirectly, to the presence or use, generation, storage, release, threatened release, or disposal of hazardous materials by Lessee, its officers, employees, agents and/or invitees on the Premises after the beginning of the term of this Lease Agreement.
C. Lessee releases the City from any and all claims Lessee may have against the City of whatever kind or nature resulting from or in any way connected with the environmental condition of the Premises, including any and all claims Lessee may have against the City under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (" CERCLA"), or any other federal, state or local law, whether statutory or common law, ordinance, or regulation pertaining to the release of hazardous materials into the environment or at the Premises. Notwithstanding the City hereby indemnifies Lessee against any and all claims arising out of any pre-existing environmental conditions on City-owned property at or about the Premises or those resulting from the actions of the City, the City' s elected officials, officers, employees, agents and volunteers that result in hazardous materials being brought to or about the premises, and clean-up required. Lessee expressly waives the benefits of Civil Code Section 1542, which provides as follows:
A general release does not extend to claims which the creditor does not know or expect to exist in his favor at the time of executing the release, which if know by him must have materially affected his settlement with the debtor.
D. Lessee' s obligations under this Section shall survive termination or expiration of this Lease Agreement.
11. UTILITIES
The Lessee shall be responsible for the cost of utilities within assigned areas of the premises as set forth below. Lessor shall assume the cost of lighting the walkways and other public areas of Caldwell Park. The Lessee shall pay 75% of the electrical charges and 50% of all other utility expenses for main building( Premise# 10009046, Account# 20953- 6, Meter# 30131) Packet Pg. 266 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
12. TAXES
Lessee is advised that, pursuant to Revenue and Taxation Code section 107. 6, this Lease Agreement may create a possessory interest subject to taxation. Lessor shall pay all taxes and special assessments assessed against the land and existing improvements, except that Lessee shall pay all possessory interest taxes levied against the premises, if any, arising out of Lessee' s occupancy hereunder.
13. INDEMENITY AND INSURANCE
A. This Lease Agreement is granted upon the express condition that Lessor, its officers, agent and employees, shall be free from any and all liability and claims for damages for personal injury, death, or property damage in any way connected with Lessee' s use of the Premises hereunder leased, including claims of Lessee, it' s officers, agents, employees, members, or invitees. Lessee shall indemnify and save harmless Lessor, its officers, agents and employees, from any and all liability, loss, cost or obligation on account of or arising out of any such injury, death, or loss caused by the negligence or other legal fault of Lessee or its officers, agents, employees, members or invitees.
B. Unless modified in writing by City' s Risk Manager, Lessee shall maintain the following noted insurance during the duration of the Contract:
Coverage Required Not Required
Commercial General Liability X
Comprehensive Vehicle Liability X
Workers' Compensation and Employers' X
Liability
Professional Liability (Errors and Omissions) X
Place an" x" in the appropriate box)
C. Coverage shall be at least as broad as:
1. Insurance Services Office form number CG- 0001, Commercial General Liability Insurance, in an amount not less than $ 1, 000, 000 per occurrence and $ 2, 000,000 general aggregate for bodily injury, personal injury and property damage;
2. Insurance Services Office form number CA- 0001 ( Ed. 1/ 87), Comprehensive Automobile Liability Insurance, which provides for total limits of not less than 1, 000,000 combined single limits per accident applicable to all owned, non- owned and hired vehicles;
3. Statutory Workers' Compensation required by the Labor Code of the State of California and Employers' Liability Insurance in an amount not less than $ 1, 000,000 Packet Pg. 267 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at per occurrence. Both the Workers' Compensation and Employers' Liability policies shall contain the insurer's waiver of subrogation in favor of City, its elected officials, officers, employees, agents and volunteers;
4. The City does not accept insurance certificates or endorsements with the wording but only in the event of a named insured' s sole negligence" or any other verbiage limiting the insured' s insurance responsibility.
D. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its elected officials, officers, employees, agents and volunteers; or the Lessee shall procure a bond guaranteeing payment of losses and related investigations, claims administration and defense expenses.
E. The General Liability shall contain or be endorsed to contain the following provisions:
1. City, its elected officials, officers, employees, and agents are to be covered as additional insured as respects liability arising out of work or operations performed by or on behalf of Lessee; premises owned, leased or used by Lessee; or automobiles owned, leased, hired or borrowed by Lessee. The coverage shall contain no special limitations on the scope of protection afforded to City, its elected officials, officers, employees, agents and volunteers.
2. The insurance coverage of Lessee shall be primary insurance as respects City, its elected officials, officers, employees, agents and volunteers. Any insurance or selfinsurance maintained by City, its elected officials, officers, employees, agents and volunteers, shall be in excess of Lessee' s insurance and shall not contribute with it.
3. Coverage shall state that the insurance of Lessee shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
4. Each insurance policy required by this Contract shall be endorsed to state that coverage shall not be canceled except after thirty ( 30) calendar days' prior written notice has been given to City. In addition, Lessee agrees that it shall not reduce its coverage or limits on any such policy except after thirty ( 30) calendar days' prior written notice has been given to City.
F. Insurance is to be placed with insurers with a current A.M.Best' s rating of no less than AVII.
G. Lessee shall designate the City of Redding as a Certificate Holder of the insurance.
Lessee shall furnish City with certificates of insurance and original endorsements effecting the coverages required by this clause. Certificates and endorsements shall be furnished to: Risk Management Department, City of Redding, 777 Cypress Avenue, Redding, CA 96001. The certificates and endorsements for each insurance policy are to Packet Pg. 268 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by the City' s Risk Manager prior to the commencement of contracted services. City may withhold payments to Lessee if adequate certificates of insurance and endorsements required have not been provided, or not been provided in a timely manner.
H. The requirements as to the types and limits of insurance coverage to be maintained by Lessee as required by Section 5 of this Contract, and any approval of said insurance by City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by Lessee pursuant to this Contract, including, without limitation, provisions concerning indemnification.
I. If any policy of insurance required by this Section is a " claims made" policy, pursuant to Code of Civil Procedure § 342 and Government Code § 945.6, Lessee shall keep said insurance in effect for a period of eighteen ( 18) months after the termination of this Contract.
J. If any damage, including death, personal injury or property damage, occurs in connection with the performance of this Contract, Lessee shall immediately notify City' s Risk Manager by telephone at ( 530) 225- 4068. No later than three ( 3) calendar days after the event, Lessee shall submit a written report to City' s Risk Manager containing the following information, as applicable: 1) name and address of injured or deceased person( s); 2) name and address of witnesses; 3) name and address of Lessee' s insurance company; and 4) a detailed description of the damage and whether any City property was involved.
14. ASSIGNMENT AND SUBLETTING
Lessee shall not assign this Lease or any interest therein, and shall not sublet the premise or any part thereof, nor any right or privilege appurtenant thereto, nor suffer any other person to occupy or use the premises or any portion thereof, without the written consent of Lessor first had and obtained. A consent by Lessor to one assignment, subletting, occupation, or use by another person or entity shall not be deemed to be a consent to any subsequent assignment, subletting, occupation, or use by another person or entity. Any such assignment or subletting without such consent shall be void and shall, at the option of Lessor, terminate this Lease. This Lease shall not, nor shall any interest therein, be assignable as to the interest of Lessee by operation of the law without the written consent of Lessor.
15. ADMINISTRATION BY LESSOR
Whenever Lessee is required to secure the approval or consent of Lessor under this Lease, Lessor shall mean the Director of Community Services, or his or her designee. However, at the option of the Community Services Director of Lessor, or the Lessee, any such question may be referred to the City Council of Lessor, whose decision thereon shall be final.
16. BINDING ON SUCCESSORS
Packet Pg. 269 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at All terms, covenants, condition, and provisions of this Lease shall extend to and be binding upon the heirs, executors, administrators, person representatives, successors, and assigns of the parties hereto.
17. NOTICES
All notices and other communications authorized or required under this Lease shall be in writing and shall be given by ( a) personal delivery, (b) mailing by first class mail, postage prepaid, or( c) delivery by commercially recognized courier service. Any such notice or other communication shall be deemed to have been given on the date of delivery or refusal to accept delivery if addressed as follows:
LESSEE: LESSOR:
Turtle Bay Exploration Park City of Redding
Attn: CEO Attn: Community Services Director
1335 Arboretum Drive, Suite A 777 Cypress Avenue
Redding, California 96003 Redding, California 96001
Either party may change its address for the purposes of this paragraph by giving written notice of such change to the other party in the manner provided in this paragraph.
18. SURRENDER OF PREMISES
On the expiration, cancellation or termination of this Lease, Lessee shall surrender possession of the Premises to Lessor, deliver all keys to the locks on the Premises, and make known to Lessor the combination of all combination locks on the Premises. Lessee shall reimburse Lessor for any damage done to the Premises caused by Lessee' s use of the Premises or Lessee' s actions or omissions.
Lessee shall remove all Lessee' s personal property and perform any and all necessary restoration made necessary by the removal of any personal property on or before the date of expiration, cancellation or termination. Lessor can elect to retain or dispose of in any manner any alterations agreements pertaining to the Premises, or any of the parties hereto, which originated before the date of this Lease are null, void and no longer in force and with no effect, and are replaced in total with this Lease unless otherwise expressly stated in this Lease. This Lease shall not be altered, amended or modified except by a writing signed by Lessor and Lessee.
24. SEVERABILITY
The unenforceability, invalidity, or illegality of any provision shall not render the other Packet Pg. 270 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at provisions unenforceable, invalid, or illegal.
25. ATTORNEYS' FEES
In any dispute between Lessor and Lessee, the prevailing party shall be entitled to recover from the other party all reasonable costs, including, without limitation, reasonable attorney' s fees.
Prevailing party" shall include, without limitation, a party who dismisses an action for specific performance or for damages in exchange for sums allegedly due, performance for covenants allegedly breached or consideration substantially equal to the relief sought in the action, or which receives from the other party, in connection with any dispute, performance substantially equivalent to any of these. No sum for attorney fees shall be included in calculating the amount of a judgement for purposes of deciding whether a party is entitled to its costs or attorney fees.
26. DATE OF AGREEMENT
The date of this Lease shall be the date that it is signed by Lessor.
Packet Pg. 271 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at r
IN WITNESS WHEREOF, the parties hereto have executed this Lease Agreement in the presence of their respective officers duly authorized in that behalf on the day and year set forth above.
CITY OF REDDING,
A Municipal Corporation
Dated: r 2017 4.410111
BRENT WEAVER, Mayor
ATTEST: APPROVED AS TO FORM:
BARRY E. DEWALT
City Attorney
r-)
a 4, Li 4t/
PAMELA MIZE, City C7 ' By:
TURTLE BAY EXPLORATION PARK
A California nonpr it public benefit corp.
Dated: !- a O 2017 7
By: EO
Packet Pg. 272 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
EXHIBIT A
N
AO
W -
4-
E
S
CALDWELL
440.
K
1„= T CO'
HILA
R
SKATE
150
PARK
CALDWELL dr/'/
RECREATION f T17 @l
TEEN
C
CEe ip R
p0 s BOAT RAMP 1
CARTER
HOUSE ale;
IRIS
n
Packet Pg. 273 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at Exhibit B
The" premises" is located in the City of Redding, County of Shasta, State ofCalifornia, consists of 3, 900 square feet of space within a freestanding single-story building located in Caldwell Park, known as the Caldwell Recreation Center and the adjacent freestanding single-story temporary office building, as shown below and incorporated herein by this reference.
Turtle Bay Storage Space
Approx. 3, 900 sq. feet( plus mezzanine storage area)
IMNIMINEN
City of Redding Caldwell
Recreation Center
Approx. 4, 800 sq. feet
I
North
1 Building
Entrance
Packet Pg. 274 Attachment: Caldwell Recreation Center Lease Agreement (C-7389) (4.6(a)--Approve Lease Amendment with Turtle Bay Exploration Park at
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize submission of a grant application to the United States Forest Service Community Wildfire Defense Grant – West Program for the amount of $250,000 to augment funding for the City of Redding Community Wildfire Protection Plan (CWPP) Project.
Fiscal Impact
The City of Redding (City) would receive up to $250,000 in grant funding from the United States Forest Service (USFS) Community Wildfire Defense Grant (CWDG) program, which requires 10 percent local matching funds or in-kind contributions. The 10 percent matching funds can be covered by the $175,000 already received from the Cal Fire Prevention Grant.
Additionally, the City could include staff salaries for staff time committed to the project as an inkind contribution. Because the City already meets the local matching fund's requirements, no additional funding is necessary to qualify for CWDG program funding.
Alternative Action
The City Council may choose not to authorize this grant application and the City would use existing funding sources to complete the Community Wildfire Protection Plan (CWPP) or search for alternate opportunities to replace the missed CWDG funding opportunity.
Background/Analysis
In 2019, the City participated in the Community Planning Assistance for Wildfire (CPAW) Program which works with communities to reduce wildfire risks through improved land use planning. The CPAW Final Report recommended that the City continue to improve wildfire planning by creating a CWPP. The CPAW recommendation also pointed out that the CWPP provides an avenue for additional grant and funding opportunities.
MEETING DATE: September 6, 2022
ITEM NO. 4.8(a)
FROM:
***APPROVED BY***
[email protected] [email protected] SUBJECT: 4.8(a)--Authorize Grant Application to the United States Forest Service (USFS) Community Wildfire Defense Grant - West Program
Jerrod Vanlandingham, Fire
Chief
Packet Pg. 275
Report to Redding City Council August 30, 2022
Re: 4.8(a)--Authorize Grant Application to USFS Community Wildfire Defense Grant - West Program Page 2
Not having an active CWPP has limited the eligibility of the City to apply for grant funding that might have paid for additional fire prevention, fuel reduction, and community education projects.
In Spring 2022 the City was awarded a $520,083 grant from the California Department of Forestry and Fire Protection in which $175,000 was budgeted to contract a consultant to prepare a CWPP for the City. Analysis of recently conducted CWPPs in the State of California indicate the cost of completing a comprehensive and quality CWPP may exceed that amount.
The FY 2022 CWDG was authorized under the Infrastructure Investment and Jobs Act, which was signed into Federal law in November 2021. The CWDG program specifically provides grant funding for the development and revision of CWPPs and implementation of projects described in a recent CWPP. The CWDG program is a competitive funding source that is expected to be funded with $160 million annually for the next five years.
Once a CWPP is in place, the City would be able to apply for larger awards in future funding cycles to carry out implementation projects specified in a CWPP. Additionally, if the City’s Hazard Mitigation Plan is approved, active, and contains specific planning for wildfire prevention, there is a possibility the City could be eligible for implementation funding in the next cycle even if the CWPP is not yet finalized.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• Budget and Financial Management – “Achieve balanced and stable 10-year Financial Plans for all funds.”
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” • Communication and Transparency – “Improve the quality of communication with the public and City employees to enhance knowledge and increase transparency to improve public trust.”
• Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
Packet Pg. 276
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize and ratify the submission of an application for the U.S. Department of Justice 2022 Edward Byrne Memorial Justice Assistance Grant (Grant) in the amount of $33,408 to fund Gang/Probation/Parole overtime operations and to purchase crime analysis software for the Redding Police Department; and authorize the City Manager to sign the grant application's Certifications and Assurances signifying that the governing body was notified of the application and citizens were provided the opportunity to comment on the application.
Fiscal Impact
This grant provides supplemental funding to the Redding Police Department (RPD). There is no negative General Fund impact by applying for and accepting this grant funding.
Alternative Action
The City Council could choose not to approve the grant application. RPD would lose the opportunity to perform Gang/Probation/Parole overtime operations and to purchase needed software.
Background/Analysis
The Redding Police Department is scheduled to receive funding from the United States Department of Justice 2022 Edward Byrne Memorial Justice Assistance Grant. This is a formula (block) grant through which RPD will be awarded $33,408. These funds are usually offered on an annual basis, but the amount and application deadlines vary from year to year. The grant application deadline was August 8, 2022, and the application has already been submitted online.
Prior to the utilization of these funds, the City of Redding (City) must make the application available for review by the governing body and must allow an opportunity for comments from citizens. Attached is a Utilization Plan explaining how the funds will be expended.
MEETING DATE: September 6, 2022
ITEM NO. 4.9(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.9(a)--Authorize and ratify submission of an application for the U.S. Department of Justice 2022 Edward Byrne Memorial Justice Assistance Grant to provide funding for antigang operations and crime analysis software for the Redding Police Department Bill Schueller, Chief of Police
Packet Pg. 277
Report to Redding City Council August 30, 2022
Re: 4.9(a)--Department of Justice Assistance Grant Page 2 RPD requests that the funds this year be used to fund Gang/Probation/Parole overtime operations and to purchase crime analysis software. Prior to 2015, RPD operated a Gang/Probation/Parole Unit with the mission to conduct proactive gang enforcement, investigate gang-related offenses, perform probation/parole searches of known gang members, identify gang marking and graffiti, gather intelligence, identify and document gang members, provide statistical data to the city and the public, and to educate schools and members of the public on how to identify gang activity, as well as the dangers associated with it. Due to staffing challenges, the unit was disbanded in 2015.
This grant will provide RPD the opportunity to be proactive regarding gang and probation/parole issues.
As policing becomes more and more data driven, it is necessary to provide the Crime Analyst with the proper tools to analyze the collected data. Currently, the data is collected in the department’s record management system (RMS) and then must be abstracted and manually analyzed through spreadsheets. The crime analysis software will be used to streamline the process of analyzing data and providing it to those who need it.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” Attachments
Project Narrative - JAG 2022
Packet Pg. 278
Proposal Narrative
The City of Redding Police Department (RPD) is an agency with 117 authorized sworn positions. Over the last several years, RPD has been able to add additional sworn positions but still struggles to keep up with crime in the area. The award of $33,408 will be used to for Gang/Probation/Parole operations and to purchase crime analysis software.
Gang/Probation/Parole Operations - Prior to 2015, the Redding Police Department operated a Gang/Probation/Parole Unit within the Detective Division. This unit generally consisted of 4 detectives and was supervised by a sergeant. The mission for this unit was to conduct proactive gang enforcement, investigate gang-related offenses, perform probation/parole searches of known gang members, identify gang markings and graffiti, gather intelligence, identify and document gang members, provide statistical data to the city and the public, and to educate schools and members of the public on how to identify gang activity, as well as the dangers associated with it.
The RPD Gang Unit also participated in an inter-agency coalition known as the Shasta AntiGang Enforcement Task Force (SAGE). The purpose of SAGE was to work together as allied agencies to reduce the ability of gangs to gain a foothold in Shasta County. Unfortunately, this collaboration could not be sustained due to staffing issues experienced by all of the agencies and the RPD Gang/Probation/Parole Unit, as well as SAGE, disbanded in 2015.
Since 2015, the Redding Police Department has not had the means to effectively identify, address, and enforce laws upon gang activity in the community. In recent years there has been Packet Pg. 279 Attachment: Project Narrative - JAG 2022 (4.9(a)--Department of Justice Assistance Grant) an increase in Asian gang activity related to unlawful marijuana cultivation occurring in the North State. The presence of these gangs has resulted in an increase in violent crime, to include a vicious homicide of a non-gang member in June of 2021. The suspect in this homicide was apprehended near Minneapolis, Minnesota, where he had ties to the Asian Crips gang.
RPD has also seen an alarming increase in outlaw motorcycle gang (OMG) activity with members from various groups. Most notably, the Hells Angels recently opened a Redding clubhouse in Shasta County, about 3 miles east of Redding city limits. The clubhouse has impacted the City of Redding by increasing the number of OMG members and affiliates who travel through the city, stay in local motels/hotels, and frequent restaurants and bars in the city.
This has resulted in an uptick in drug activity, violent crimes and firearm related crimes.
The State of California has historically struggled with crime related to the most well known Hispanic and African American gangs: Surenos, Nortenos, Crips and Bloods. Although Redding is a rural city in Northern California, RPD still struggles with issues surrounding these prison and criminal street gangs. These issues consist of drug activity, human trafficking, violence and various other crimes.
Having the necessary funding to allocate patrol officers and detectives to address gang activity in the City of Redding on a regular basis over the next three (3) years will have a noticeable impact and will stymie what has the potential to be a prolific problem in the City of Redding.
Packet Pg. 280 Attachment: Project Narrative - JAG 2022 (4.9(a)--Department of Justice Assistance Grant) JAG funding will be used to develop a program managed by a Detective Sergeant which would allocate two (2) officers/detectives working a four (4) hour shift approximately once a month tasked with the following:
• Proactive gang enforcement
• Probation/Parole search of known gang members
• Intelligence gathering and documentation
• Vetting known and likely gang members
• Investigate gang related offenses
• Gathering of statistical data
• Provide education and support to schools and community stakeholders • Improve the overall quality of life in the community
RPD will also coordinate with allied agencies in the region to share information and to address the problem at the regional level. Data will be collected on all operations to ensure the program is addressing the issue and to determine if another approach needs to be taken.
Crime Analysis Software – As policing becomes more and more statistic driven, it is necessary to provide RPD’s crime analyst with the proper tools to analysis all the data collected. Currently, the data is collected in RPD’s record management system (RMS) and then must be extracted and manually analyzed through spreadsheets. Purchasing software will allow the analyst to streamline the process and provide information to those who need it. New software would help with the following activities:
Packet Pg. 281 Attachment: Project Narrative - JAG 2022 (4.9(a)--Department of Justice Assistance Grant) • Identify, track and monitor drug and alcohol dependent offenders to help fill the gaps of the lack of jail space and aid with the Chronic Offender Accountability Program tracking when there is space.
• Track/identify youth at risk of joining gangs and/or using narcotics and establish prevention strategies to intervene with juvenile offenders to prevent future violent crimes. • Track/identify drug manufacturing and trafficking in the area and assist specialized units by providing information on problem areas.
• Track/identify crimes against the elderly.
• Help compile information to disseminate to the public/media that will be useful in the identification and apprehension of offenders.
• Compile data and information for release to the public/media to help build trust in our agency/criminal justice system.
• Aid the Crisis Intervention Response Team with tracking for their cases and provide new potential candidates for their programs.
While specific software has not been identified at this time, RPD will use the funds to identify the best solution for their needs and purchase it with JAG funds.
Packet Pg. 282 Attachment: Project Narrative - JAG 2022 (4.9(a)--Department of Justice Assistance Grant)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions:
(1) Approve the acquisition of Public Services Easements (Easements) at 5015 Bechelli Lane (Assessor’s Parcel Number (APN) 070-320-016); 1611 Dakota Way (APN 116-410-006) and 1620 Tidmore Court (APN 116-410-007) at no cost to the City; (2) Authorize the Mayor to execute all legal documents necessary to complete the acquisitions; and
(3) Find this action to be consistent with the General Plan and exempt from environmental review under the California Environmental Quality Act pursuant to 14 CCR Section 15061[b][3] Common Sense Exemption.
Fiscal Impact
There is no cost for the acquisitions, therefore these acquisitions will not have a fiscal impact on the City of Redding’s General Fund or Electric Utility Operating Fund.
Alternative Action
The City Council (Council) may choose to not authorize the acquisition of the easements. This would require staff to find less optimal locations.
Background/Analysis
In order to increase reliability of delivering electric service, Redding Electric Utility will be undergrounding electric transmission lines and removing associated poles on the subject properties. Easements are needed to accommodate the subterranean placement of the lines. Staff has negotiated the acquisition of the easements at no cost to the City. The property owner agrees that the visual benefit gained by removal of the overhead electric lines as well as the increased safety associated with a reduced fire risk is a sufficient exchange for granting the easements. A MEETING DATE: September 6, 2022
ITEM NO. 4.11(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(a)--Authorize the acquisition of Public Service Easements Chuck Aukland, Public
Works Director
Packet Pg. 283
Report to Redding City Council August 30, 2022
Re: 4.11(a)--Authorize Acquisitions of Public Service Easements Page 2 summary of the easements is as follows:
Address APN Easement Area
5015 Bechelli Lane 070-320-016 1505 Square Feet
1611 Dakota Way and 1620 Tidmore Court 116-410-006 and 116-410-007 5146 Square Feet Environmental Review
For purposes of the California Environmental Quality Act per 14 CCR Section 15061[b][3], the project is considered to be exempt from environmental review under the Common Sense Exemption. There are no environmental attributes to the easements which would merit preparation of a mitigated negative declaration or environmental impact report. These easements do not have significant values for wildlife habitat or other environmental purposes. As such, there is no possibility that acquisition of these easements will have a significant impact on the environment.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Exhibit and Description - 5015 Bechelli Lane
^Exhibit and Description - 1611 Dakota Way and 1620 Tidmore Court NOE REU Public Service Easement Acquisitions
Packet Pg. 284
\
\\
\
\
\
i
!
i
I
I
/
I
!
!
I
-------... /
I
\
\
\
\
\~ \ '~
/
\ '""' \ ',"'
;
I
\
I
i
i
I i
I
CURVE
C1
C2
LINE TABLE
LINE BEARING DISTANCE
L1 N 62"09'39" W 54.02
L2 s 89"47 25 E 12.62
L3 S 89"47 25" E 29.07
L4 N 05"32 12" E 80.93
L5 s 73"52 38 E 7.63'
L6 s 05"3212" w 77.71
CURVE TABLE
RADIUS
625.08
175.00'
PARCa C
2001-0049557
ARC LENGTH
8.03 21.33
DELTA ANGLE
0"44 1 0"
06"58 57"
----
---
~- ·--- ...... -·-·-·- ORTHERLY UN -- --------------POC-- ----------- PARCEL 1 -----,, EASTERLY CORNER 2003-0069880 ·.,,'-
PARCa C '"-.,
21 PM 145 ' ',, .,
'·"--
LEGEND
POC - POINT OF' COMMENCEMENT
TPOB - TRUE POINT OF' BEGINNING
h:-~:n\':'1'':<1 ARE'A OF' EASEMENT 1n SQ. FT.
--------------- r------------------------i ------·------... _____ / DWG. NO:
_ _,____
/:
ENGINEERING DIVISION
r-t·-
0 --
100
APRIL, 2022
200
EXHIBIT vev
10.00' PUBLIC SERVICE EASEMENT
5015 BECHELLI LANE
ASSESSOR PARCEL 070-320-016
Sheet 1 of 1
Packet Pg. 285 Attachment: ^Exhibit and Description - 5015 Bechelli Lane (4.11(a)--Authorize Acquisitions of Public Service Easements)
EXHIBIT 'A'
LEGAL DESCRIPTION
All that real property being a portion of Section 18 Township 31 North, Range 4 West, M.D.M. in the City of Redding, County of Shasta, State of California, described as follows:
A 10.00-foot-wide strip ofland for Pubic Services Purposes lying 5.00 feet on each side of the following described centerline and being a portion of Parcel C and Parcel D as described in that Correction Property Line Adjustment Grant Deed recorded November 20, 2001 in Instrument Number 2001-0049557, Shasta County records, being more particularly described as follows:
Commencing at the most Easterly corner of Parcel Cas shown on that Parcel Map No. LS87-79 for Eagle Investment Company filed May 26, 1981 in Book 21 of Parcel Maps at Page 45, Shasta County records;
Thence from said Easterly corner on and along the Easterly line of said Parcel C North 62° 09' 39" West 54.02 feet;
Thence South 89° 4 7' 25" East 12.62 feet to the beginning of a tangent curve to the right; Thence on and along said curve having a radius of 625.08 feet through a central angle of 0° 44' 10" arc distance of 8.03 feet to a point on the Northerly line of Parcel "1" as described in that Grant Deed to the City of Redding recorded October 15, 2003 in Document Number 2003-0069880, Shasta County records;
Thence on and along said Northerly line South 89° 47' 25" West 29.07 feet to the beginning of a tangent curve to the left;
Thence on and along said curve having a radius of 175.00 feet through a central angle of06° 58' 57" an arc distance of 21.33 feetto a point on the line common to said Parcel C and Parcel D;
Thence on and along the line between said Parcel C and Parcel D North 05° 32' 12" East80.93 feet to a point on the Northerly line of said Parcel C and also being a point on the Southerly line of South Bonnyview Road;
Thence on and along said southerly line of said South Bonnyview Road South 73° 52' 38" East 7.63 feet to the TRUE POINT OF BEGINNING;
Thence from said point of beginning and leaving said Southerly line South 05° 32' 12" West
77.71 feet to a point on the Northerly line of said Parcell as described in that Grant Deed to the City of Redding recorded on October 15, 2003 in Document Number 2003-0069880, Packet Pg. 286 Attachment: ^Exhibit and Description - 5015 Bechelli Lane (4.11(a)--Authorize Acquisitions of Public Service Easements) Shasta County records, said point being the terminus of the centerline of the herein described
10.00-foot-wide Public Service Easement.
The sidelines line of herein described 10.00-foot-wide Public Service Easement to be lengthened or shortened to coincide with the Northerly line of said Parcel C and with the Northerly line of Parcell as described in that Grant Deed to the City of Redding recorded on October 15, 2003 in Document Number 2003-0069880, Shasta County records.
Containing 777 square feet more or less.
Assessor Parcel No. 070-320-016
Date: _ _ _
Charles Ken Iwamura, PLS 8540, City Surveyor
Packet Pg. 287 Attachment: ^Exhibit and Description - 5015 Bechelli Lane (4.11(a)--Authorize Acquisitions of Public Service Easements) Line Table
Direction Length
L1 N74. 58' 50"W 13.60
L2 S16. 27' 53"E 161.24
L3 S11· 28' 59"E 173.11
APN 116-410-007
L :J = AREA OF EASEMENT
5146 SF ±
POB = POINT OF BEGINNING
POC = POINT OF COMMENCMENT
PARCEL 3
27-PM-103
CITY OF REDDING
ENGINEERING DIVISION
120'
NORTH I
DWG. NO:
4003-10 JANUARY 4, 2022
APN 116-410-006
PARCEL 1
27-PM-103
15.00'
SOUTHERLY
LINE
PARCEL 3
APN 116-410-008
1607 DAKOTA WAY
PARCEL 2
27-PM-103
EXHIBIT "B"
PUBLIC SERVICE EASMENT
REDDING, CA 96UU3
APN: 116-410-006, 116-410-007, Packet Pg. 288 Attachment: ^Exhibit and Description - 1611 Dakota Way and 1620 Tidmore Court (4.11(a)--Authorize Acquisitions of Public Service Easements) EXHffiiT 'A'
LEGAL DESCRIPTION
All that real property situated in the City of Redding, County of Shasta, State of California, and being a portion of Parcel 1 and Parcel 3 as shown on Parcel Map No. LS-31-89 for Dorothy Tidmore filed January 10, 1990 in Book 27 at Page 103 of Parcel Maps in the office of the County Recorder of said County, being more particularly described as follows:
A strip of land 15.00-foot-wide strip of land for public services purposes lying 7.50 feet on each side of the following described centerline.
Commencing a the most Northerly comer common to said Parcels 1 and 3; Thence from said common comer North 74° 58' 50" West 13.60 feet to the TRUE POINT OF BEGINNING;
Thence from the said point of beginning South 16° 27' 53" East 161.24 feet; Thence South 11° 28' 59" East 173.11 feet to a point on the Southerly line of said Parcel 3±±± and being the terminus of said centerline.
The sidelines of said easement to be lengthened or shortened to coincide with adjoining property lines.
Containing 5416 square feet more or less.
Portions of Assessor Parcels 116-410-006, 116-410-007
aries Ken Iwamura, C1ty Surveyor
PLS 8540
~ 1o-22
Date
Packet Pg. 289 Attachment: ^Exhibit and Description - 1611 Dakota Way and 1620 Tidmore Court (4.11(a)--Authorize Acquisitions of Public Service Easements)
NOTICE OF EXEMPTION
TO: Office of Planning and Research FROM: City of Redding 1400 Tenth Street, Room 121 Public Works Department
Sacramento, CA 95814 777 Cypress Avenue
Redding, CA 96001
☒ Shasta County Clerk
County of Shasta
P.O. Box 990880, 1643 Market Street
Redding, CA 96099-0880
Project Title: Redding Electric Utility Public Service Easements Project Location – Specific: 5015 Bechelli Lane, 1611 Dakota Way, and 1620 Tidmore Court Project Location – City: Redding Project Location – County: Shasta Description of Project: The Redding Electric Utility will acquire public service easements on three properties in the City of Redding. In order to increase reliability of delivering electric service, Redding Electric Utility will be undergrounding electric transmission lines and removing associated poles on the subject properties. Public Service Easements (Easements) are needed to accommodate the subterranean placement of the lines.
Name of Public Agency Approving Project: City of Redding Name of Person or Agency Carrying Out Project: Ken Iwamura, City Surveyor Exempt Status: (check one)
Ministerial [Section 21080(b)(1); 15268]
Declared Emergency [Section 21080(b)(3); 15269(a)]
Emergency Project [Section 21080(b)(4); 15269(b)]
Statutory Exemptions. State code number:
Common Sense Exemption (This project does not fall within an exempt class, but it can be seen with certainty that there is no possibility that the activity may have a significant effect on the environment (14 CCR 15061[b][3]). Categorical Exemption. State type and section number:
No exceptions apply that would bar the use of a categorical exemption (PRD 21084 and 14 CCR 15300.2).
Reasons why project is exempt: CEQA applies only to projects which have the potential for causing a significant effect on the environment. The easement areas have no underlying environmental attributes or resources. The action has been reviewed and it can be seen with certainty that there is no possibility that the action may have a significant effect on the environment; therefore, the activity is not subject to CEQA.
Lead Agency Contact Person: Amber Kelley Telephone: 530.225.4046 If Filed by Applicant:
1. Attach certified document of exemption finding.
2. Has a notice of exemption been filed by the public agency approving the project? □ Yes □ No Signature:__________________________ Date:_________________________ Title: Environmental Compliance Manager
Signed by Lead Agency Date received for filing at OPR:______________ Signed by Applicant
Packet Pg. 290 Attachment: NOE REU Public Service Easement Acquisitions (4.11(a)--Authorize Acquisitions of Public Service Easements)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following related to the purchase of one 2022 AlJon Advantage 500 Compactor for the City of Redding Solid Waste Utility:
(1) Authorize the purchase using Houston-Galveston Area Council contract pricing, with a net delivered cost of $977,249.79, including all applicable taxes and fees; and (2) Authorize the City Manager to approve future pricing adjustments, terms, and policy changes as needed due to inflation and unstable economic conditions up to a total of $30,000.
Fiscal Impact
Funding for this purchase was approved by the Solid Waste Disposal Committee and adopted in the Fiscal Year 2021-23 Biennial Budget; therefore, there is no new fiscal impact to the Solid Waste Utility.
Alternative Action
The City Council may choose to not authorize the purchase using Houston-Galveston Area Council (HGAC) contract pricing, and direct staff to use the City of Redding’s (City) competitive bid process, which would delay acquisition of the compactor.
Background/Analysis
Part of the Solid Waste Utility’s (Utility) daily operations includes processing waste brought to the Richard W. Curry West Central Landfill (Landfill). Operations have seen a significant increase in construction and demolition debris in recent years, partially due to local fires and rebuilding but also new development. Using a compactor daily in landfill operations maximizes the capacity of landfill airspace for waste disposal, which is significant in extending the life of the landfill. The Utility would use this new machine as a replacement for the current primary unit.
MEETING DATE: September 6, 2022
ITEM NO. 4.11(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(c)--Authorize the Purchase of One AlJon Advantage 500 Compactor Using Houston-Galveston Area Council Contract Pricing
Chuck Aukland, Public
Works Director
Packet Pg. 291
Report to Redding City Council August 30, 2022
Re: 4.11(c)--Purchase of One AlJon Advantage 500 Compactor Page 2 The compactors work in a very harsh environment. The expected lifecycle for a primary or frontline unit is around 7,500 hours. On average the Utility puts between 1,500 – 2,000 hours annually on the compactors. They operate 6 days per week year-round. The current frontline machine has approximately 7,000 hours, and once replaced, would serve as a backup unit after needed repairs and maintenance are complete. The current backup unit has 13,230 hours and requires significant and costly repairs including replacement of two final drives, repair of a steering pump replacement, and replacement of metal wheels and teeth.
The HGAC cooperative contract was competitively bid. In addition to being an industry standard, using the HGAC cooperative contract to purchase equipment saves significant staff time which is needed to prepare bid specifications and solicit individual quotations from vendors.
The City also receives a significant price discount due to economies of scale realized through the volume of purchases on a multi-agency cooperative contract.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^HGAC Quote
^HGAC Summary of unpublished options
Packet Pg. 292
Contract
No.: SM10-20 Date
Prepared: 8/15/2022
Buying
Agency: Contractor:
Contact
Person:
Prepared
By:
Phone: Phone:
Fax: Fax:
Email: Email:
Quan Unit Pr Total
1 945,875 945875
1 11,500 11500
1 -114,885 -114885
0 0
0 0
0 0
0 0
0 842490
Quan Unit Pr Total
1 80,445 80445
0 0
0 80445
10%
36,138
24,894
-73,630
-12598
910337
CONTRACT PRICING WORKSHEET
For Catalog & Price Sheet Type Purchases
General Description
of Product: Landfill Compactor SM1343A
[email protected]
C&C Manufacturing LLC
Greg Shockley
479-629-6550
[email protected]
5 year 10,000 hour extended powertrain warranty
Contract discount = 12%
Catalog / Price Sheet
Name: ALJON SERIES LANDFILL COMPACTOR
Description
A. Catalog / Price Sheet Items being purchased - Itemize Below - Attach Additional Sheet If Necessary Auto Lube
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.
City of Redding
Michael Deedon
530-224-6206
Total From Other Sheets, If Any:
C. Trade-Ins / Special Discounts / Other Allowances / Freight / Installation / Miscellaneous Charges Description
Aljon Series 500 Landfill Compactor 1x48x58 cone wheel - 112 M-Trax cleats - Straight blade - Total From Other Sheets, If Any:
See attached summary of unpublished options
Delivery Date: 2-28-2023 estimated D. Total Purchase Price (A+B+C):
B. Unpublished Options, Accessory or Service items - Itemize Below - Attach Additional Sheet If Necessary (Note: Unpublished Items are any which were not submitted and priced in contractor's bid.) Subtotal A:
Subtotal C:
Freight - Set up and commissioning
Special customer discount
Check: Total cost of Unpublished Options (B) cannot exceed 25% of the total of the Base Unit Price plus Published Options (A+B). For this transaction the percentage is:
Subtotal B:
Packet Pg. 293 Attachment: ^HGAC Quote (4.11(c)--Purchase of One AlJon Advantage 500 Compactor) City of Redding Aljon 500
July 26, 2022 HGAC quote -
Itemized list of unpublished options (Box B)
Qty Description Price
1 Deduct for contract pricing - 112 M-Trax Cleats $ (25,250.00) 1 20 lbs. fire extinguisher $ 372.00
1 Remote battery jumper $ 536.00
1 GPS wiring $ 764.00
1 Telematics - includes 2 year service plan $ 4,577.00
1 140 traction & Lateral Diamond Cleats $ 74,594.00
1 Syklone Respa filtration system $ 12,187.00
1 Dual highlighter strobe $ 772.00
1 Heavy duty seat $ 4,577.00
1 Heated side mirrors $ 515.00
1 LED Lights $ 572.00
1 HD Cylinder for tarpomatic $ 6,000.00
1 10 lbs. fire extinguisher $ 229.00
Total $ 80,445.00
Pricing valid through September 16, 2022
Packet Pg. 294 Attachment: ^HGAC Summary of unpublished options (4.11(c)--Purchase of One AlJon Advantage 500 Compactor)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Schedule No. 5257 (Job No. 9943) Reconstruction of Terminal Building Access Roads Project Phase 2:
(1) Approve and award to Tullis, Inc., an additional amount of $56,575 for a traffic control plan required for the safe completion of Phase 2;
(2) Authorize staff to execute a Contract Change Order with Tullis, Inc., in the amount of $845,484 to construct Bid Alternative 2;
(3) Approve $84,000 to provide construction contingency funding and $22,650 for City of Redding staff construction management services;
(4) Amend Mead & Hunt, Inc., Authorization of Service (AOS) 22-07 to provide an additional amount of $134,604 for construction management services for the additional work;
(5) Authorize the City Manager, or designee, to apply for and execute the Federal Aviation Administration (FAA) grant applications and all subsequent documentation necessary to obtain grant funds for the projects; and
(6) Adopt Resolution approving and adopting the 57th Amendment to City Budget Resolution No. 2021-078 appropriating $1,036,530 for the project.
Fiscal Impact
The proposed Bid Alternative 2 of the Reconstruction of Terminal Building Access Roads Project Phase 2, will be funded through a Federal Aviation Administration (FAA) Bipartisan Infrastructure Law (BIL) Airport Infrastructure Grant (AIG) where the FAA will cover 90.66 percent of project costs. The Public Works Streets Division will provide currently budgeted local matching funds at 9.34 percent for this public roadway that also benefits the Redding Fire Department Station 7, located at the Redding Regional Airport. To seamlessly transition this additional scope into the access road project currently underway, and to reduce the impact of mobilization and demobilization costs, the City of Redding (City) will prefund this project with the expectation that the City will be reimbursed in Spring 2023, through the Airport Division’s MEETING DATE: September 6, 2022
ITEM NO. 4.11(d)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(d)--Authorize a contract change order with Tullis, Inc. and Approve Authorization of Services Amendment with Mead & Hunt, Inc.
Chuck Aukland, Public
Works Director
Packet Pg. 295
Report to Redding City Council August 31, 2022
Re: 4.11(d)--Authorize contract change order with Tullis & Approve AOS Amendment with Mead & Hunt, Inc. Page 2
BIL AIG allotment. The BIL AIG allotments are funds set aside for each airport based on their annual enplanements and do not need to be competitively applied for. It was by the FAA Airport District Office’s recommendation that this project be pursued using this source of funding, so staff considers the risk of failure to be reimbursed very low. Contingency funds will be prefunded by the City and reimbursed at the FAA’s discretion up to a maximum of 15 percent of the federal max obligation of the grant. Contingency funds are not authorized to be included in the initial AIG application and must be sought as they occur by amendment to the original FAA grant. Should any contract change orders be necessary to address site conditions, staff will pursue a grant amendment with the FAA.
Cost Summary
Item Awarded Amount Proposed
Amount
Increase/(Decrease)
Project Development Costs $343,000 $343,000 $0
Traffic Control Plan $0 $56,575 $56,575
Construction Contract +
Contingency
$2,398,980 $3,328,464 $929,484
Contract Administration,
Inspection, Testing
$421,577 $578,831 $157,254
Total Project Cost $3,163,557 $4,306,870 $1,143,313
Project cost components are estimates, and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget.
Alternative Action
The Council may choose not to award the increase for Bid Additive Alternative 2 for the Reconstruction of the Terminal Building Access Roads Project Phase 2 and provide staff with alternative direction. Without this Bid Additive Alternate, Flight Avenue will require continued repair and maintenance, and the project will not move forward. Further, future efforts to reconstruct the access road will come with the increased cost of mobilization and demobilization and higher unit pricing due to inflation.
Background/Analysis
The City of Redding competitively bid the Reconstruction of the Terminal Building Access Roads Project and opened bids on November 30, 2021. The bids were for the Base Bid, Bid Additive Alternate 1, Bid Additive Alternative 2, and Bid Additive Alternative 3. Attached to this staff report is a tabulation of bids received and opened on November 30, 2021, for this project. The Council awarded this project on June 21, 2022, to Tullis, Inc., the lowest bidder in the amount of $1,584,520. The engineer's estimate was $2,237,650. Also awarded was Bid Alternate 1 in the amount of $596,460. To date, project Phase 1 was completed early this Summer and Phase 2 is currently underway, which accounts for the bids associated with Base Bid and Bid Additive Alternate 1. Staff has worked with the FAA on identifying other funding sources for access road projects. Since this project was subsequently determined eligible for additional grant assistance through AIG, the recommendation is to proceed with Phase 2 - Bid Additive Alternative 2. There is no plan to pursue a Bid Additive Alternative 3 as the FAA indicates the work is ineligible for FAA grant assistance.
Packet Pg. 296
Report to Redding City Council August 31, 2022
Re: 4.11(d)--Authorize contract change order with Tullis & Approve AOS Amendment with Mead & Hunt, Inc. Page 3
Originally, the Council budgeted $6,750,000 for the total project when it was believed the project would be applied for in a single grant. To provide greater fiscal accountability, staff is reducing the previously budgeted value to only the amount represented in past grants and actual expenses associated with the previous phases of the project. This will allow for new funds to be appropriated to Phase 2 and provide staff with better ability to track and maintain project costs within the allocated budget.
The Reconstruction of Terminal Building Access Roads, Phase 2 - Bid Additive Alternative 2 work consists of the removal and reconstruction of street improvements along Flight Avenue at the Redding Regional Airport. The section of Flight Avenue to be reconstructed is approximately 1,250 lineal feet. The trees at the north side of Flight Avenue are not healthy and/or their roots are causing damage to the infrastructure. The scope of work consists of removal of the existing trees, curb and gutter and asphalt pavement sections. Replacement trees and the overall landscape plan will be identified at a later date along with funding resources. The asphalt concrete (AC) grindings will be recycled as aggregate base (AB) under the proposed sidewalks.
New lime treated subgrade and base will be installed along with new AC pavement.
Approximately 1,540 lineal feet of new curb and gutter will be placed together with about 2,190 square feet of concrete sidewalk. It is anticipated that conduits or sleeve crossings will be installed in approximately four locations to avoid future trenching through the new road section.
Similarly, a sanitary sewer lateral will be installed with a new manhole for a future service. The reconstructed road section will consist of five-inches of AC over nine-inches of AB. To complete the project, thermoplastic striping and markings will be placed, and new street signs will be installed to replace the existing ones that have faded significantly.
The Resolution has been approved as to form by the City Attorney.
Environmental Review
On June 21, 2022, Council determined that the project is Categorically Exempt from review under the California Environmental Quality Act (CEQA) Guidelines, per Section 15301 - Existing Facilities, and Section 15302 – Replacement or Reconstruction. The determination still holds true, as all associated roadways and alternatives were included in the original CEQA review. No further CEQA review is required at this time.
On October 5, 2020, the FAA determined that the project is Categorically Excluded pursuant to FAA Order 1050.1F as it relates to the National Environmental Policy Act of 1969, as amended.
No further NEPA review is required at this time.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Resolution
^Bid Tabulation
^Terminal Access Roads Reconstruction Bid Alternate 2 Layout Plan First Amendment to AOS NO. 22-07 (C-8976)
Previous Staff Report 6-21-2022
Packet Pg. 297
RESOLUTION NO. 2022-___
A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE 57
th AMENDMENT TO CITY BUDGET RESOLUTION NO. 2021-078
APPROPRIATING $1,036,530 FOR PHASE TWO BID ALTERNATIVE TWO OF
THE RECONSTRUCTION OF TERMINAL LOOP ACCESS ROAD PROJECT FOR FISCAL YEAR 2022-23
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING THAT Budget Resolution No. 2021-078 be and is hereby amended as follows:
FUND DIVISION DESCRIPTION INCREASE DECREASE
134
111
821
518
Redding Regional Airport
Streets - Construction
1,036,530
0 THAT account titles and numbers requiring adjustments by this Resolution are as follows:
USE SOURCE
OF FUNDS OF FUNDS
Increase (Decrease) Revenue
134-821-6-2650-70 Federal Grant - Capital - Transportation $ 1,036,530 Increase(Decrease) Expenditures
111-518-3580-01 Overlay Projects $ (106,790)
111-518-4582-08 Terminal Loop Phase 2 Alt. 2 106,790
134-821-4582-08 Terminal Loop Phase 2 Alt. 2 1,036,530
Total $ 1,036,530 $ 1,036,530
THAT the purpose is to appropriate $1,036,530 for Phase Two Bid Alternative Two of the Reconstruction of Terminal Loop Access Road project for fiscal year 2022-23.
I HEREBY CERTIFY that the foregoing Resolution was introduced at a regular meeting of the City Council of the City of Redding on the 6th day of September, 2022, and was duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
KRISTEN SCHREDER, Mayor
ATTEST: FORM APPROVAL:
PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 298 Attachment: ^Resolution (4.11(d)--Authorize contract change order with Tullis & Approve AOS Amendment with Mead & Hunt, Inc.) BID TABULATION FOR:
RECOSNTRUCTION OF TERMINAL BUILDING ACCESS ROADS, PHASE 2 Bid Schedule No.: 5257Job No.: 9943 ENGINEER'S EST Tullis, Inc. S.T. Rhoades Constructions, Inc.*11/30/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL Base Bid
1 Mobilization LS 1 $209,000.00 $209,000.00 $50,000.00 $50,000.00 $175,000.00 $175,000.00 2 Contractor Quality Control Program (CQCP) LS 1 $45,000.00 $45,000.00 $25,000.00 $25,000.00 $125,000.00 $125,000.00 3 Safety and Traffic Control LS 1 $60,000.00 $60,000.00 $10,000.00 $10,000.00 $60,000.00 $60,000.00 4 Construction Staking and Survey Layout LS 1 $55,000.00 $55,000.00 $15,000.00 $15,000.00 $24,000.00 $24,000.00 5 Miscellaneous Removals and Site Preparation LS 1 $20,000.00 $20,000.00 $16,000.00 $16,000.00 $45,000.00 $45,000.00 6 Temporary Access Roads LS 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 7 Temporary Chain-Link Fence LF 290 $165.00 $47,850.00 $79.00 $22,910.00 $90.00 $26,100.008 Remove Concrete Curb and Gutter LF 3930 $15.00 $58,950.00 $11.00 $43,230.00 $9.00 $35,370.00 9 Pavement Removal SY 9190 $10.00 $91,900.00 $9.00 $82,710.00 $10.00 $91,900.00 10 Crack Repair LF 1500 $6.00 $9,000.00 $8.00 $12,000.00 $10.00 $15,000.00 11 Removal of Foreign Substances/contaminates SF 570 $4.50 $2,565.00 $4.00 $2,280.00 $10.00 $5,700.00 12 Removal of 18-inch RCP Storm Drain Pipe LF 200 $50.00 $10,000.00 $8.00 $1,600.00 $75.00 $15,000.00 13 Removal of Inlets/Manholes EA 3 $500.00 $1,500.00 $500.00 $1,500.00 $1,000.00 $3,000.0014 Removal of Inlets/Manholes over Box Culvert EA 4 $800.00 $3,200.00 $250.00 $1,000.00 $2,000.00 $8,000.00 15 Tree Removal EA 31 $2,000.00 $62,000.00 $500.00 $15,500.00 $400.00 $12,400.0016 Installation and Removal of Silt Fence LF 980 $8.00 $7,840.00 $4.00 $3,920.00 $8.00 $7,840.00 17 Prepare Water Pollution Control Plan LS 1 $2,500.00 $2,500.00 $750.00 $750.00 $1,000.00 $1,000.00 18 Water Pollution Control LS 1 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $5,500.00 $5,500.0019 Additional Erosion Control
Work T&M 1 $2,000.00 $2,000.00 $500.00 $500.00 $1.00 $1.00 20 Environmentally Sensitive Area (ESA) Fencing LF 940 $10.00 $9,400.00 $6.00 $5,640.00 $5.00 $4,700.00 21 Unclassified Excavation CY 520 $100.00 $52,000.00 $80.00 $41,600.00 $100.00 $52,000.00 22 Subgrade Preparation SY 10500 $5.00 $52,500.00 $4.25 $44,625.00 $7.00 $73,500.00 23 In-Place Drying Techniques SY 4650 $5.00 $23,250.00 $8.00 $37,200.00 $15.00 $69,750.00 24 Lime-Treated Subgrade SY 9300 $11.00 $102,300.00 $12.00 $111,600.00 $11.00 $102,300.00 25 Lime TON 310 $250.00 $77,500.00 $235.00 $72,850.00 $280.00 $86,800.0026 Crushed Aggregate Base Course CY 2330 $75.00 $174,750.00 $65.00 $151,450.00 $99.00 $230,670.00