Agenda
Regular Meeting
Redding City Council
Council Chambers (Doors open 30 minutes prior)
777 Cypress Avenue, Redding, CA
December 20, 2022
6:00 PM
The City Council Chambers are fully open to the public in compliance with current guidelines from the California Department of Public Health regarding indoor meetings.
1. CALL TO ORDER - MAYOR MICHAEL DACQUISTO
A. Pledge of Allegiance
B. Invocation - Reverend Ken Ficklin, Unity Church in Redding C. Roll Call
2. PRESENTATIONS
2A. Presentation of Mayor’s Proclamation declaring March 8, 2023, as Joe Cosca Day in the City of Redding.
3. PUBLIC COMMENT - for non-agendized matters within the city’s jurisdiction.
PURSUANT TO THE BROWN ACT, CITY COUNCIL CANNOT TAKE ACTION ON PUBLIC
COMMENT ITEMS
The City Council will allocate up to a maximum of three minutes per speaker for 30 minutes total, at the beginning of the meeting for Public Comment for non-agendized matters within the City’s jurisdiction.
The Mayor will determine the order of the speakers. If 30 minutes is not adequate to accommodate all of the individuals who have submitted a Speaker Request Form to the City Clerk, the Council will trail this item to the end of the open session agenda. The remaining speakers will address the City Council at that time.
If anyone wishes to address the City Council on any item considered at this meeting before or during Council’s consideration of that item, please fill out a blue Speaker Request Form, located in the lighted alcoves at the back of the Council Chambers, and submit it to the City Clerk. The City Council will allocate up to a maximum of three minutes per speaker for each agenda item. Staff reports are available on-line at the City’s web site at www.cityofredding.org or in the Public View binder located on the podium at the north side of the Chambers.
PLEASE SILENCE YOUR CELL PHONES. THANK YOU.
Redding City Council December 20, 2022
4. CONSENT CALENDAR
The Consent Calendar contains items considered routine and/or which have been individually scrutinized by City Council Members and are anticipated to require no further deliberation. If a member of the public wishes to address an item on the Consent Calendar, please fill out a Speaker Request Form and submit it to the City Clerk before the Consent Calendar is considered. It shall be the prerogative of any Council Member, before the Consent Calendar is acted upon, to: (1) comment on an item; (2) respond to any public comment on an item; (3) request the record reflect an abstention or nay vote on an item; or (4) remove an item and place it on the Regular portion of the agenda for delivery of a staff report and/or an extended discussion or deliberation. 4(b). Accept City of Redding Accounts Payable Register No. 10; and Payroll Register No. 11.
4(f). Adopt Ordinance No. 2656, an ordinance of the City Council of the City of Redding, amending Redding Municipal Code Title 2 (Administration and Personnel) to Repeal and Reenact Chapter 2.32 (Fire Department).
4.2(a). Authorize the following actions relative to the Alturas Crossing I Project (Project) located at 1320 and 1358 Old Alturas Road:
(1) Authorize the City Manager to execute the First Amendment to the Development Agreement, C-9259 (Amendment) with Alturas Crossing, LP (Developer), thereby increasing the City of Redding loan by $1,494,416, for a total loan amount of $3,494,416;
(2) Authorize the City Manager to execute any other documents necessary to modify the Community Development Block Grant-Disaster Recovery Multifamily Housing Program grant application and loan documents to facilitate the funding increase; and
(3) Find that increasing funding for a development is not a project as defined by the California Environmental Quality Act (CEQA) and that the Alturas Crossing construction project was previously found to be exempt pursuant to CEQA Section 15332 (in-fill development projects). The Alturas Crossing construction project has previously been reviewed and determined to meet National Environmental Policy Act compliance.
4.2(b). Adopt Resolution acknowledging Kennett Court II Apartments is complete pursuant to City of Redding requirements and the Community Development Block Grant-Disaster Recovery Multi-Housing Program guidelines.
4.2(c). Approve the City of Redding 2022 Shelter Crisis Annual Report (Report); and authorize staff to submit the Report to the corresponding State of California Senate and Assembly Committees by January 1, 2023.
Redding City Council December 20, 2022
4.5(a). Authorize the following actions relative to Bid Schedule No. 5139 (Job Nos. 4006-20 and 4010-20) for furnishing Electric Utility trench and excavation work:
(1) Approve an increase of $500,000 to the bid schedule budget; and (2) Authorize the City Manager, or designee, to approve change orders up to, and not to exceed, the total budget of $1,012,330.
4.8(a). Authorize the sole-source purchase of one Type III wildland engine from Golden State Fire Apparatus, Inc., for a price not to exceed $450,000, which includes inspection trips, delivery, sales tax, and a pre-payment discount.
4.11(a). Authorize the following actions relative to Request for Proposal Schedule No. 5319, Architectural Services for the Fire Stations Assessment and Modernization Project:
(1) Award to Nichols, Melburg and Rossetto (NMR);
(2) Authorize the Mayor to execute a Consulting and Professional Services Contract with NMR for an amount not to exceed $297,950; and (3) Authorize the City Manager, or designee, to approve any amendments up to $30,000.
4.11(b). Award the lowest competitive bids relative to Bid Schedule No. 5329, Rock and Mineral Products, to J.F. Shea, Stimpel-Wiebelhaus, and Tullis, Inc. for the annual purchase of rock, asphalt, and mineral aggregates at an estimated cost of $350,000.
4.11(c). Accept the City of Redding Mitigation Fee Act Report Update, including an accounting of development fees; and adopt Resolution making findings concerning unexpended funds.
4.11(d). Authorize the following actions relative to the Flood Damage Repair Project within City of Redding park and trail areas:
(1) Adopt the Mitigated Negative Declaration and the Mitigation Monitoring and Environmental Commitment Program; and
(2) Approve the Flood Damage Repair Project as described, thereby satisfying the requirements of the California Environmental Quality Act Guidelines pursuant to Section 15074.
4.11(e). Authorize the following actions relative to the Silverstone Subdivision-Unit 2 (AMND-2020-01135/S-2019-00280):
(1) Accept the improvements in Silverstone Subdivision - Unit 2 as satisfactorily complete;
(2) Adopt Resolution accepting streets for maintenance and operation; and (3) Instruct the City Clerk to return the related securities to the developer following completion of the warranty period or as directed by the City Engineer upon completion of all obligations.
Redding City Council December 20, 2022
4.11(f). Authorize the following action relative to the Shastina Ranch Subdivision - Unit 5 (S-7-03/PD-5-04):
(1) Accept the improvements in Shastina Ranch–Unit 5 as satisfactorily complete;
(2) Adopt Resolution accepting streets for maintenance and operation; and (3) Instruct the City Clerk to return the related securities to the developer following completion of the warranty period or as directed by the City Engineer upon completion of all obligations.
4.11(g). Authorize the following actions relative to Bid Schedule No. 5330 for furnishing liquid chlorine, sulfur dioxide, sodium bisulfite, and sodium hypochlorite:
(1) Award to Thatcher Company of California, Inc., and Jones Chemical, Inc., for a total annual evaluated cost of $609,275 (not including tax and freight);
(2) Authorize the Purchasing Officer to approve the annual contract amendments through December 31, 2027; and
(3) Authorize the Purchasing Officer to approve price increases per manufacture price increases, inflation, and other market factors.
4.11(h). Authorize the following actions relative to Bid No. 5325 for furnishing various chemicals:
(1) Award contracts to Helix Labs, Hill Brothers Chemical Company, and Univar USA, Inc., for a total annual evaluated cost of $298,043.25 through December 31, 2023, not inclusive of sales tax, mill fees, or shipping;
(2) Authorize staff to purchase various chemicals from each of the suppliers depending on market availability or delays in product delivery; and (3) Authorize the Purchasing Officer to approve quarterly rate changes and manufacturer price increases.
4.11(i). Authorize the following actions relative to Bid Schedule No. 5333 (Job No. 2608) Woodacre Sewer Main Replacement Project:
(1) Award to Mitchell Johnson Construction, Inc., in the amount of $783,954;
(2) Approve an additional $126,000 to cover the cost of administration and inspection fees; and $45,000 for project development costs; (3) Approve $130,000 to provide construction contingency funding; (4) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $15,000; and
(5) Find that the project is categorically exempt from review under the California Environmental Quality Act Guidelines, pursuant to Section 15301(b) - Existing Facilities.
4.11(j). Accept update regarding the City of Redding’s COVID-19 Economic Stimulus Package projects.
Redding City Council December 20, 2022
4.12(a). Approve the Local Appointments List consisting of Exhibits A and B relative to 2023 term expirations and vacancies for City of Redding Boards, Commissions, and Committees to fulfill the requirements of Government Code Section 54972 (Maddy Act).
4.15(a). Adopt Resolution approving an amendment to the Redding Independent Employees’ Organization Clerical, Technical and Professional Non-Exempt and Exempt Schedule of Classifications and Wage Rates changing classification titles effective December 25, 2022.
RECOMMENDATION: ACCEPT, ACKNOWLEDGE, ADOPT, APPROVE,
AND/OR AUTHORIZE ALL ITEMS ON THE CONSENT CALENDAR.
5. APPOINTMENTS
Mayor Dacquisto
5.1. Consider reappointment to the Shasta Mosquito Abatement and Vector Control District.
Recommendation:
Accept the Mayor’s recommendation to reappoint Philip Cramer to the Shasta Mosquito Abatement and Vector Control District Board to serve a second two-year term beginning January 1, 2023, and ending December 31, 2024.
9. REGULAR CALENDAR: REPORTS & COMMUNICATIONS OF DEPARTMENTS,
BOARDS, COMMISSIONS AND COMMITTEES
City Manager
9.1(a). Consider submission of letter to the Bureau of Indian Affairs regarding Fee-toTrust Application submitted by Redding Rancheria.
Recommendation:
Authorize the following actions relative to the Fee-to-Trust Application pertaining to 228.64 acres of land owned by the Redding Rancheria immediately south of the southern terminus of Bechelli Lane, east of Interstate 5 submitted by the Redding Rancheria to Bureau of Indian Affairs:
(1) Accept report;
(2) Establish a position on the Fee-to-Trust Application; and (3) Provide direction to staff related to a written response to the Bureau of Indian Affairs.
Redding City Council December 20, 2022
Assistant City Manager
9.2(d). Consider approval of the Mark Street Emergency Housing Site and the Consulting and Professional Services Agreement with United Way to operate the site.
Recommendation:
Approve the following actions relative to the City of Redding’s leased property located at 3211 Mark Street (Assessor’s Parcel No. 108-360-026) (Property) and the Mark Street Emergency Housing Site (EHS):
(1) Approve United Way of Northern California’s (United Way) South Market Micro-Shelter Community Operations and Services Manual (Manual) and Site Plan;
(2) Authorize the City Manager to negotiate and execute a Consulting and Professional Services Contract with United Way for the operations of the Mark Street EHS that includes eight, single-occupancy sleeping cabins provided at the property, in a total amount not to exceed $150,000; (3) Authorize the City Manager to negotiate with United Way a one-year sublease, with a one-year renewal option, and authorize the Mayor to sign the sublease;
(4) Authorize the City Manager to issue an EHS permit to United Way for the Mark Street EHS that includes up to eight, single-occupancy sleeping cabins and to set the one-year term start date;
(5) Authorize the City Manager to negotiate and execute a County of Shasta (County) American Rescue Plan Act (ARPA) funded agreement for $300,000 and appropriate $150,000 of County ARPA funds to United Way for the operations of the Mark Street EHS; and
(6) Based on the facts in the record, make the finding that the subject permit is categorically exempt under California Environmental Quality Act Guideline Section 15061(b)(3) and 15304, Class 4 Minor Alterations to Land and that the National Environmental Policy Act review shows that the project is categorically excluded subject to 58.5 but converted to exempt status.
Electric Utility
9.5(b). Oral report to provide a progress update regarding the City of Redding Electric Utility's Strategic Plan.
Recommendation:
Accept an oral presentation from the Electric Director providing a progress update on the Electric Utility’s 2026 Strategic Plan.
Redding City Council December 20, 2022
Police Department
9.9(a). Consider Resolution appropriating funds relative to hiring two (2) Crisis Intervention Response Team (CIRT) Officers.
Recommendation:
Adopt Resolution approving and adopting the 76th Amendment to City Budget Resolution No. 2021-078 approving two full time CIRT Officers and appropriating $156,070.
Personnel
9.15(b). Consider Resolution approving an exception to the California Public Employee's Retirement System (CalPERS) 180-day wait period with regard to re-hiring Jules (Jay) Marchesseault in the position of Electric Manager-Engineering, effective January 1, 2023.
Recommendation:
Adopt Resolution approving a 180-day wait period exception of Jules Marchesseault as Electric Manager-Engineering for the City of Redding pursuant to Government Code sections 7522.56 and 21224, effective January 1, 2023, for up to 960 hours; and granting the City Manager authority to execute the necessary hiring documentation.
The resolution, if approved, would allow retired Electric Manager-Engineering, Jules Marchesseault, to be rehired as an annuitant in the Electric Utility to assist with a special project, extra help needed with the preparation for the North American Electric Reliability Corporation (NERC) Audit of Redding Electric Utility’s Transmission Owner/Transmission Operator (TO/TOP) Compliance program, and the training of the replacement personnel.
11. COUNCIL TRAVEL REPORT(S)
City Council Member attendance at conference/meetings reimbursed at City expense. {Requirement of Assembly Bill 1234}
[A-050-060]
Information Only
12. SUGGESTIONS FROM COUNCIL MEMBERS RELATIVE TO POTENTIAL TOPICS
FOR FUTURE CITY COUNCIL MEETINGS
13. ADJOURNMENT
Redding City Council December 20, 2022
Pursuant to the Brown Act, non-confidential materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are available for inspection during normal business hours at the Office of the City Clerk, 3rd Floor, City Hall, 777 Cypress Avenue, Redding, California.
City Council Meetings will be televised live on Shasta Community Access Channels via Charter/Spectrum Cable channel 181, and will be rerun on Thursday at 12:30 p.m. during the week in which the meeting is held. Additionally, the meeting can be viewed online at the following: http://scac.cablecast.tv:8080/CablecastPublicSite/watch/4?channel=1. Video of the City Council meetings can also be viewed on the City’s web site at http://www.cityofredding.org/. Open the City’s meetings and agendas portal; Click on tab named "Meetings Videos" and select Redding City Council under “Available Archives 2022” select the desired date, then click on “video” to view the meeting.
In compliance with Title II of the Americans with Disabilities Act, the City of Redding will make available to persons with disabilities modifications or accommodations including auxiliary aids or services necessary to participate in public meetings. A person needing assistance should contact the Redding City Clerk by telephone at (530) 225-4447 or in person, or by mail at 777 Cypress Avenue, 3rd Floor, Redding, California 96001 at least three (3) working days in advance.
The City of Redding will ensure that no person shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination under any of its projects, activities, services, or business opportunities on the basis of race, color, national origin, age, sex, or disability, as afforded by Title VI of the Civil Rights Act of 1964 and related statutes as amended. All persons, regardless of their citizenship status, are covered under this regulation.
Questions, complaints, or requests for accommodations or additional information may be forwarded to the ADA & Title VI Coordinator at 777 Cypress Avenue, Attn: Personnel Dept., Redding, California 96001, Phone (530) 225-4065.
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Presentation of Mayor’s Proclamation declaring March 8, 2023, as Joe Cosca Day in the City of Redding.
Attachments
^Proclamation
MEETING DATE: December 20, 2022
ITEM NO. 2A
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 2A--Presentation of Mayor's Proclamation to Joe Cosca.
Kim Niemer, Community
Services Director
Packet Pg. 9
Packet Pg. 10
Attachment: ^Proclamation (2A--Presentation of Mayor's Proclamation to Joe Cosca)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Accept City of Redding Accounts Payable Register No. 10; and Payroll Register No. 11.
Fiscal Impact
There is no fiscal impact to accepting the registers.
Alternative Action
The City Council could choose to not accept the registers and provide direction to staff.
Background/Analysis
Attached are the Accounts Payable and Payroll Registers as follows:
Accounts Payable:
(1) Register Number 10 for the period November 12, 2022 – November 30, 2022, in the amount of $21,356,948.72.
Payroll:
(1) Register Number 11 for the period November 13, 2022 –November 26, 2022, in the amount of $3,895,961.62.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
MEETING DATE: December 20, 2022
ITEM NO. 4(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4(b)--City of Redding Accounts Payable and Payroll Registers.
Allyn Feci Clark, Director of
Finance/City Treasurer
Packet Pg. 11
Report to Redding City Council December 6, 2022
Re: 4(b)--Accounts Payable and Payroll Registers Page 2 Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Accounts Payable Register No. 10 and Payroll Register No. 11 Packet Pg. 12
Packet Pg. 13
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 14
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 15
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 16
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 17
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 18
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 19
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 20
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 21
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 22
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 23
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 24
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 25
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 26
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 27
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 28
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 29
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 30
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 31
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 32
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 33
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 34
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 35
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 36
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 37
Attachment: Accounts Payable Register No. 10 and Payroll Register No. 11 (4(b)--Accounts Payable and Payroll Registers)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Adopt Ordinance No. 2656, an ordinance of the City Council of the City of Redding, amending Redding Municipal Code Title 2 (Administration and Personnel) to Repeal and Reenact Chapter
2.32 (Fire Department).
Attachments
^Ordinance No. 2656
MEETING DATE: December 20, 2022
ITEM NO. 4(f)
FROM:
***APPROVED BY***
[email protected]
SUBJECT: 4(f)--Adopt Ordinance No. 2656, amending Redding Municipal Code Chapter
2.32 (Fire Department) to reflect updates to outdated language and processes.
Jerrod Vanlandingham, Fire
Chief
Packet Pg. 38
ORDINANCE NO. 2656
AN ORDINANCE OF THE CITY OF REDDING AMENDING REDDING
MUNICIPAL CODE TITLE 2 (ADMINISTRATION AND PERSONNEL)
TO REPEAL AND REENACT CHAPTER 2.32 (FIRE DEPARTMENT)
THE CITY COUNCIL OF THE CITY OF REDDING DOES ORDAIN AS FOLLOWS:
Section 1. Title 2 (Administration and Personnel), Chapter 2.32 (Fire Department) is hereby repealed and reenacted with a title to read as follows:
FIRE DEPARTMENT
Sections:
2.32.010 Established.
2.32.020 Fire Chief - Appointment.
2.32.030 Fire Chief – Duties generally.
2.32.040 Power to remove property.
2.32.050 Conduct of fire department employees.
2.32.060 Substitutes for officers.
2.32.070 Training drills.
2.32.080 Use of equipment.
2.32.090 Obstructing vehicles and apparatus.
2.32.100 Injuring equipment.
Section 2. Title 2 of the Redding Municipal Code is amended to add Sections 2.32.010 through 2.32.100, inclusive, to Chapter 2.32 to read as follows:
2.32.010 - Established.
There is established a Fire Department for the City of Redding.
2.32.020 - Fire Chief - Appointment.
The Fire Chief shall be appointed by the City Manager, subject to the approval of the City Council.
2.32.030 - Fire Chief - Duties generally.
The Fire Chief is the chief executive officer of the Fire Department and is invested with the following powers:
A. To have charge of the Fire Department facilities, its apparatus and employees. The Fire Chief may make rules and regulations for the governance and management thereof. The Fire Chief shall have such other duties as may be prescribed by this Chapter or which may be imposed upon the Fire Chief from time to time by the City Manager.
First reading done: 11/15/2022 JV
For adoption on: 12/20/2022 4-0 (CM Resner absent)
CC agenda item #4(f)
Packet Pg. 39
Attachment: ^Ordinance No. 2656 (4(f)--Adopt Ordinance No. 2656 re Amending Redding Municipal Code Title 2) B. To develop and maintain a range of programs and resources designed to protect the lives and property of the inhabitants of the City of Redding from all predictable risks including but not limited to: the prevention, suppression and recovery from undesired fire; injury prevention, pre-hospital emergency medical care, rescue, extrication and recovery services; the prevention and mitigation of unplanned or the inappropriate release of hazardous materials; and community awareness, emergency preparedness and response to other dangerous conditions.
C. To make a complete annual report to the City Manager at a time to be determined by the City Manager concerning the Fire Department in general. The report shall provide a description of the condition of the Fire Department, make recommendations for improvements and describe the activities of the Fire Department during the year; D. To have direct control, management and direction of all personnel of the Fire Department and the power to direct them to such public service in the best interest and efficiency of the department;
E. To enforce the rules and regulations of the City of Redding and its Fire Department and to suspend or terminate from employment any subordinate employee in such a manner as is provided herein or as provided through collective bargaining; F. To exercise command over the Fire Department at emergency incidents and over all equipment belonging to it;
G. To extinguish all fires with the least possible danger to life and property and prevent unnecessary damage at fires;
H. To see that the premises on which fires occur are left in such condition that they will not rekindle and cause further damage to life and property; I. To make a complete record of each incident, investigation of each fire, keeping a record of and determining the cause, amount of loss to buildings and contents, the number and description of each building destroyed together with the names of the owners and occupants;
J. It is the duty of the Fire Chief to see that all provisions of this Chapter and Chapter
9.20 are enforced, and for this purpose and while in the discharge of these duties, the Fire Chief shall be vested with the powers of a peace officer; K. While acting in the line of duty, to blockade any street and remove any persons or property therefrom, to insure efficient working of firefighters and equipment and to prevent injury to life and property;
L. Preserve order at all emergency incidents, and shall, whenever proper or necessary, call upon the Chief of Police, or any other peace officer, to preserve order and to make arrests, and to prevent interference with lawful orders or with firefighters.
Packet Pg. 40
Attachment: ^Ordinance No. 2656 (4(f)--Adopt Ordinance No. 2656 re Amending Redding Municipal Code Title 2)
2.32.040 - Power to remove property.
The Fire Chief, or Fire Chief's designee in command, shall have the power to cause the removal of any property, whenever it shall become necessary to the preservation of such property in an emergency, or to protect adjoining property. It is unlawful for any person to refuse to obey or hinder any order given pursuant to this Section.
2.32.050 - Conduct of fire department employees.
Firefighters must conduct themselves in a manner that reflects positively on the department.
Firefighters will exercise professionalism, competence, respect and loyalty in the performance of their duties and use information, confidential or otherwise, gained by virtue of their position, only to benefit those that they serve.
2.32.060 - Substitutes for officers.
The Fire Chief shall designate the order of succession of officers so that the designation shall be clear in the absence of superiors. The superior officer shall take full charge at emergency incidents if arriving there before the chief officers and shall report to them in person upon their arrival, the condition of affairs.
2.32.070 - Training drills.
Regular drills and training for the Fire Department shall be conducted and carried on under the direction and supervision of the fire chief or some responsible officer appointed by the Fire Chief.
2.32.080 - Use of equipment.
A. It is unlawful for any person not a member of, or connected with, the Fire Department, except emergency employees of the City, to ride on or use the apparatus or equipment of the department except as authorized by the Fire Chief or other officer of the Fire Department.
B. No part of the Fire Department apparatus of the City of Redding shall be taken out of the city limits without permission of the Fire Chief or the City Manager. No part of the equipment of the Fire Department shall be loaned to any person. No part of the Fire Department apparatus of the City of Redding shall be taken from the fire station except for the purpose of responding to emergencies or reports of emergencies; department training; public relations or education; public assistance; repair of equipment, or in cases where the equipment is needed to keep the equipment and crew available for immediate response, except on permission of the Fire Chief or the City Manager.
Packet Pg. 41
Attachment: ^Ordinance No. 2656 (4(f)--Adopt Ordinance No. 2656 re Amending Redding Municipal Code Title 2)
2.32.090 - Obstructing vehicles and apparatus.
No person shall willfully or carelessly allow any vehicle in his/her control to obstruct the apparatus of the Fire Department. Upon the approach of any vehicle or apparatus of the Fire Department answering an alarm of fire or emergency call, and sounding a bell or siren, the driver of any vehicle shall drive as close as possible to the right curb and stop. The driver of any vehicle shall not follow the Fire Department vehicle within three hundred (300) feet. No vehicle except by direction of an engineer of the Fire Department or other officer of the fire department shall approach, park or operate within three hundred feet of a fire, fire equipment or appurtenances thereto at any time.
2.32.100 - Injuring equipment.
No person shall willfully injure any engine house, hose, engine or any other apparatus or drive over any hose of the Fire Department.
Section 3. Severability. If any section, subsection, sentence, clause or phrase of this Ordinance is for any reason held by a court of competent jurisdiction to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of the ordinance. The City Council of the City of Redding hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause and phrase thereof irrespective of the fact that one or more sections, subsections, sentences, clauses or phrases may be held invalid or unconstitutional.
Section 4. The passage of this ordinance is not a “project” according to the definition in the California Environmental Quality Act, and therefore is not subject to the provisions requiring environmental review.
Section 5. This ordinance shall take effect thirty (30) days after the date of its adoption, and the City Clerk shall certify to the adoption thereof and cause its publication according to law.
I HEREBY CERTIFY that the foregoing ordinance was introduced and read by the City Council of the City of Redding at a regular meeting on the 15th day of November, 2022, and was duly read and adopted at a regular meeting on the ____ day of __________, 2022, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
_________________________________
, Mayor
ATTEST: APPROVED AS TO FORM:
_____________________________ _________________________________ PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 42
Attachment: ^Ordinance No. 2656 (4(f)--Adopt Ordinance No. 2656 re Amending Redding Municipal Code Title 2)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to the Alturas Crossing I Project (Project) located at 1320 and 1358 Old Alturas Road:
(1) Authorize the City Manager to execute the First Amendment to the Development Agreement, C-9259 (Amendment) with Alturas Crossing, LP (Developer), thereby increasing the City loan by $1,494,416, for a total loan amount of $3,494,416; (2) Authorize the City Manager to execute any other documents necessary to modify the Community Development Block Grant-Disaster Recovery Multifamily Housing Program (CDBG-DR MHP) grant application and loan documents to facilitate the funding increase; and
(3) Find that increasing funding for a development is not a project as defined by the California Environmental Quality Act (CEQA) and that the Alturas Crossing construction project was previously found to be exempt pursuant to CEQA Section 15332 (in-fill development projects). The Alturas Crossing construction project has previously been reviewed and determined to meet National Environmental Policy Act (NEPA) compliance.
Fiscal Impact
The State of California Department of Housing and Community Development (HCD) is the lead agency administering CDBG-DR MHP funds. These funds are granted to jurisdictions to provide financing to build income-qualifying multifamily projects. The City of Redding was allocated $16,660,145 in CDBG-DR MHP funds to facilitate the development of eligible projects and to provide funding for staff activity delivery costs.
In March 2022, the City Council (Council) approved a $2,000,000 CDBG-DR MHP loan for the Alturas Crossing Project – this additional request of $1,494,416 is the remaining balance of the CDBG-DR MHP allocation. Increasing the project loan will not impact other projects, activities, or the General Fund.
MEETING DATE: December 20, 2022
ITEM NO. 4.2(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing I, LP
Steve Bade, Assistant City
Manager
Packet Pg. 43
Report to Redding City Council December 13, 2022
Re: 4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing I, LP Page 2
Alternative Action
The Council could provide alternative direction to staff. Any modifications would require additional negotiations and may result in project delays and/or loss of CDBG-DR MHP grant funding.
Background/Analysis
As a result of the wildfires that affected California in 2018, the Federal Emergency Management Agency announced a presidentially declared disaster in five counties, including Shasta County, for the Carr Fire. In recognition of the unmet recovery needs, the U.S. Department of Housing and Urban Development allocated CDBG-DR funds to HCD for those affected jurisdictions. In turn, HCD allocated $16,660,145 to the City of Redding in an effort to support the development of affordable housing in its jurisdiction.
In February 2021, the Council adopted a resolution authorizing the acceptance of CDBG-DR MHP; authorizing the City Manager to execute HCD’s Master Standard Agreement (completed May 2021); and directed staff to issue a Request for Proposals (RFP) that provided developers an opportunity to submit multifamily project proposals that consisted of more than eight units.
Staff received a proposal for the Alturas Crossing I Project (Project) located at 1320 and 1358 Old Alturas Road for the construction of 38 income-qualifying units comprised of 14 buildings in two, three, and four-unit configurations and one manager’s unit. On March 15, 2022, the Council approved a Development Agreement allocating $2 million in CDBG-DR MHP funds for the project. Construction commenced on April 12, 2022, and is presently 56-percent complete.
The original cost of the development was $18.5 million; however, due to supply chain issues, cost overruns, historically high inflation, and increased construction loan rates, total project costs have risen to more than $20.8 million as of December, 2022. For this reason, the Developer has requested a loan increase in the amount of $1,494,416 to assist with the completion of the project. The remaining funding gap will be covered through other project resources.
Should the request be granted, the additional funding would increase the total CDBG-DR MHP loan to $3,494,416. The additional funds will follow the original loan terms; one-percent interest, 55-year loan term with repayment of the loan contingent upon the available project residual receipts. At the end of the 55-year term, any principal and interest balance will be due and payable to the City.
Environmental Review
Increasing funding is not considered a project according to the California Environmental Quality Act (CEQA). The construction project has already been determined to be categorically exempt under the (CEQA), Section 15332 (in-fill development projects).
Under the National Environmental Policy Act (NEPA), administrative and management activities are considered exempt activities and no further action is required. The NEPA review has already been completed for the Alturas Crossing construction project.
Packet Pg. 44
Report to Redding City Council December 13, 2022
Re: 4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing I, LP Page 3
Council Priority/City Manager Goals
• Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
• Economic Development- “Facilitate and become a catalyst for economic development in Redding to create jobs, retain current businesses and attract new ones, and encourage investment in the community”
Attachments
Alturas Crossing First Amendment to Development Agreement Alturas Crossing Amendment to Deed of Trust and Promissory Note Amendment to Subordination Agreement
Alturas Crossing Amendment to Regulatory Agreement
Alturas Crossing Amendment to Sr Regulatory Agreement
First Amendment to Rider to Development Agreement
Packet Pg. 45
Packet Pg. 46
Attachment: Alturas Crossing First Amendment to Development Agreement (4.2(a)--Approve First Amendment to the Development Agreement Packet Pg. 47
Attachment: Alturas Crossing First Amendment to Development Agreement (4.2(a)--Approve First Amendment to the Development Agreement Packet Pg. 48
Attachment: Alturas Crossing Amendment to Deed of Trust and Promissory Note (4.2(a)--Approve First Amendment to the Development Packet Pg. 49
Attachment: Alturas Crossing Amendment to Deed of Trust and Promissory Note (4.2(a)--Approve First Amendment to the Development Packet Pg. 50
Attachment: Alturas Crossing Amendment to Deed of Trust and Promissory Note (4.2(a)--Approve First Amendment to the Development Packet Pg. 51
Attachment: Alturas Crossing Amendment to Deed of Trust and Promissory Note (4.2(a)--Approve First Amendment to the Development Packet Pg. 52
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 53
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 54
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 55
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 56
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 57
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 58
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 59
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 60
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 61
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 62
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 63
Attachment: Amendment to Subordination Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Alturas Crossing Packet Pg. 64
Attachment: Alturas Crossing Amendment to Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 65
Attachment: Alturas Crossing Amendment to Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 66
Attachment: Alturas Crossing Amendment to Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 67
Attachment: Alturas Crossing Amendment to Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 68
Attachment: Alturas Crossing Amendment to Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 69
Attachment: Alturas Crossing Amendment to Sr Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 70
Attachment: Alturas Crossing Amendment to Sr Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 71
Attachment: Alturas Crossing Amendment to Sr Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 72
Attachment: Alturas Crossing Amendment to Sr Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 73
Attachment: Alturas Crossing Amendment to Sr Regulatory Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 74
Attachment: First Amendment to Rider to Development Agreement (4.2(a)--Approve First Amendment to the Development Agreement with Packet Pg. 75
Attachment: First Amendment to Rider to Development Agreement (4.2(a)--Approve First Amendment to the Development Agreement with
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Adopt Resolution acknowledging Kennett Court II Apartments (Project) is complete pursuant to City of Redding requirements and the Community Development Block Grant-Disaster Recovery Multi-Housing Program (CDBG-DR MHP) guidelines.
Fiscal Impact
There is no impact related to this report.
Alternative Action
The City Council (Council) could choose not to adopt the resolution acknowledging that the project is complete. Under this alternative, the City of Redding (City) would not be following CDBG-DR MHP grant requirements and the ramifications of not providing the requested resolution are unknown.
Background/Analysis
As a result of the wildfires that affected California in 2018, a Presidentially-Declared Disaster was assigned to five counties, including Shasta County for the Carr Fire. In recognition of the unmet recovery needs, the U.S. Department of Housing and Urban Development allocated CDBG-DR funds to the State of California Housing and Community Development Department (HCD). HCD is the agency responsible for administering the CDBG-DR funds and approving any resulting multifamily projects.
HCD undertook an extensive needs assessment to determine the specific priorities of the affected counties with significant community outreach and analysis that resulted in four CDBG-DR Program categories: housing, infrastructure, economic revitalization, and planning. The majority of funds are allocated to the unmet rental housing needs in affected counties. To meet the unmet MEETING DATE: December 20, 2022
ITEM NO. 4.2(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(b)--Adopt Resolution Certifying Completion of Kennett Court II Apartments Project
Steve Bade, Assistant City
Manager
Packet Pg. 76
Report to Redding City Council December 9, 2022
Re: 4.2(b)--Resolution-Completion of Kennett Court II Apartments Project Page 2 rental housing needs, HCD created the CDBG-DR MHP – Multifamily Housing Program. The City was allocated $16,660,145 in CDBG-DR MHP funds to support the development of income-eligible multifamily projects.
Kennett Court II Apartments, the first multi-family development to be completed using CDBGDR MHP funds, consists of 47 income-eligible apartment units with one manager’s unit and is located at 1155 Lake Boulevard. On March 15, 2022, the Council approved a $1,000,000 loan of CDBG-DR MHP funds to assist Kennett Investors II, LP, to develop and construct the project.
The project was completed on August 15, 2022, and is now fully occupied. CDBG-DR MHP regulations require that once the funded project is completed, the local jurisdiction must adopt a resolution that acknowledges its satisfactory completion.
Environmental Review
Adopting a completion resolution is not considered a project under the California Environmental Quality Act (CEQA). The actual construction of the project was previously reviewed for CEQA compliance.
Under the National Environmental Policy Act (NEPA), administrative and management activities such as adopting a resolution are considered exempt activities and no further action is required. The actual construction project was reviewed for NEPA requirements before the project started.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Resolution
Packet Pg. 77
RESOLUTION NO. 2022-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
AUTHORIZING THE ACCEPTANCE OF COMPLETION OF THE
KENNETT COURT II PROJECT FUNDED BY COMMUNITY
DEVELOPMENT BLOCK GRANT DISASTER RECOVERY MULTIFAMILY HOUSING PROGRAM FUNDS WHEREAS, the City Council previously approved the use of Community Development Block Grant Disaster Recovery Multi-Family Housing Program funds in the Kennett Court II Apartments development; and
WHEREAS, the Kennett Court II Apartments development has been satisfactorily completed according to City of Redding and California State Housing and Community Development guidelines;
NOW, THEREFORE, IT IS RESOLVED by the City Council that the Kennett Court II Apartments development has been satisfactorily completed.
I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 20th day of December, 2022, and was duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
MICHAEL DACQUISTO, Mayor
ATTEST: FORM APPROVED:
____________ ____________________________________
PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 78
Attachment: ^Resolution (4.2(b)--Resolution-Completion of Kennett Court II Apartments Project)
STATE OF CALIFORNIA
City of Redding
I, Pamela Mize, City Clerk of the City of Redding, State of California, hereby certify the above and foregoing to be a full, true and correct copy of a resolution adopted at a duly noticed and convened meeting of said City Council on December 20, 2022, and that such resolution has not been amended, modified, repealed or rescinded since its date of adoption and is in full force and effect as of the date hereof.
__________________________________________
PAMELA MIZE, City Clerk of the City of Redding,
State of California
By: ______________________________________
Name and Title
Packet Pg. 79
Attachment: ^Resolution (4.2(b)--Resolution-Completion of Kennett Court II Apartments Project)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Approve the City of Redding 2022 Shelter Crisis Annual Report (Report); and authorize staff to submit the Report to the corresponding State of California Senate and Assembly Committees by January 1, 2023.
Fiscal Impact
There is no fiscal impact related to the report.
Alternative Action
The City Council (Council) could choose to not approve the report or to modify the report and provide additional direction to staff.
Background/Analysis
California Government Code Section 8698 allows the governing body of a city to declare a Shelter Crisis when a significant number of persons are without the ability to obtain shelter, resulting in a threat to their health and safety. On June 15, 2021, the Council adopted a resolution declaring that the City of Redding (City) had a shelter crisis. Following this declaration, the Council approved two Ordinances (2637 and 2638), thereby amending Redding Municipal Code (RMC) Chapter 18.17.020 (Temporary Uses Exempt from Permits) and RMC Chapter 16.02.010 and Chapter 16.03.010 relating to establishing the criteria for the permitting and operation of emergency housing sites during a declared shelter crisis.
Pursuant to California Government Code Section 8698 and RMC Chapter 18.17.020, subsection M., 14, the City Manager shall, not later than July 1st of the year following the declaration of a shelter crisis, develop a plan to address the shelter crisis. The plan shall include the development of homeless shelters and permanent supportive housing as well as onsite supportive services. The Council approved the City’s Shelter Crisis Action Plan (Action Plan) on June 21, 2022.
MEETING DATE: December 20, 2022
ITEM NO. 4.2(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(c)--Shelter Crisis Annual Report
Steve Bade, Assistant City
Manager
Packet Pg. 80
Report to Redding City Council December 13, 2022
Re: 4.2(c)--Shelter Crisis Annual Report Page 2
Pursuant to California Government Code 8698.4 (a)(6), Action Plan results are to be reported to the State of California Senate Committee on Housing and the Assembly Committee on Housing and Community Development by January 1st of each year. This is the City’s first report to submit to the State of California.
Environmental Review
This is not a project under as defined under the California Environmental Quality Act and no further action is required.
Council Priority/City Manager Goals
• Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” Attachments
Shelter Crisis Action Plan
State of California Government Code Section 8698.4(a)(6) COR 2022 Annual Status Report to the State of CA Shelter Crisis Packet Pg. 81
CITY OF REDDING
SHELTER CRISIS ACTION PLAN
California Government Code Section 8698, et seq., allows the governing body of a city to declare a Shelter Crisis when a significant number of persons are without the ability to obtain shelter, resulting in a threat to their health and safety.
The 2020 Shasta County Point‐in‐Time Report provided that four hundred fifty‐four (454) individuals within the City of Redding “(“City”), including veterans, women, children, individuals with disabilities, senior citizens, and other vulnerable groups, are experiencing unsheltered homelessness within the City. Many of those unable to obtain shelter reside on the streets, in alleys and doorways, along the Sacramento River and its tributaries, and in unlawful encampments throughout the City. These individuals lack adequate sanitary facilities and are at risk from theft, crime, and extreme weather conditions, these conditions threaten the health and safety of the unsheltered population and likewise threaten the public health and safety of the public at large, contribute to a draw on public resources, and threaten the environmental health of the City’s waterways.
In June 2021, the City Council adopted a resolution declaring that the City of Redding has a shelter crisis. A shelter crisis proclaimsthat a significant number of people are without the ability to obtain shelter. Following this declaration, the Council approved two Ordinances (2637 and 2638) thereby amending Redding Municipal Code (RMC) Title 18 (Zoning), Chapter 18.17, subsection 18.17.020 (Temporary Uses Exempt from Permits) and RMC Title 16, Chapter 16.02, subsection 16.02.010 and Chapter 16.03, subsection 16.03.010 relating to establishing the criteria for permitting emergency housing sites and the operation of the same during a declared Shelter Crisis.
With the declaration of a shelter crisis and the City enacting the provisions of RMC Section
18.17.020 and portions of Title 16, these actions allow organizations within the City to request permits issued by the City Council to set up and operate an Emergency Housing Site as defined in the RMC and in Appendix O of the California Building Code. The Emergency Housing Sites will provide low barrier, sanitary shelter for up to 10 months, for those experiencing homelessness.
Wrap‐around supportive services will be provided to the occupants of the Emergency Housing Sites with the goal of moving those individuals into permanent housing.
Pursuant to California Government Code Section 8698 and RMC Chapter 18.17.020, subsection M., 14, the City Manager shall, not later than July 1st of the year following the declaration of any shelter crisis, develop a plan to address the shelter crisis which shall include the development of homeless shelters and permanent supportive housing as well as onsite supportive services.
The implementation of Emergency Housing Sites within the City of Redding provides a resource to address the crisis of the unsheltered by creating housing facilities offering short‐term shelter bridging the gap to transitional or permanent housing. Considering Emergency Housing Sites Packet Pg. 82
Attachment: Shelter Crisis Action Plan (4.2(c)--Shelter Crisis Annual Report) will play an important role in addressing unsheltered needs within our community, staff developed the following Action Plan:
I. DEVELOP CITY INTERNAL PROCESS
a. City Manager’s Office – Program Administration
i. Application Process
ii. City Property Analysis
iii. Emergency Housing Site Permit Approval
iv. Communicate Progress to City Council and Community
b. Emergency Sleeping Cabin Approval
i. Building Official
ii. Fire Marshal
iii. Pallet
iv. CHYBA
c. Site Development
i. Permit Process Checklist
ii. Internal Team (Development Services, Fire, Public Works, REU, Housing and RPD)
d. Operations and Services Plan
i. Administrative Guidelines
ii. Guide, Advise and Monitor Operations and Services Plans iii. Collect Annual Report from each Emergency Housing Site
II. BUILD CAPACITY AND PARTNERSHIPS
a. Identify Funding Resources
b. Establish Partnerships
i. Non‐Profits (St. James, GNRM, United Way)
ii. CIRT
iii. Support Services
iv. Continuum of Care
c. Collect Data
d. Seek new capital and service funding opportunities
III. HOUSING RESOURCES
a. Emergency
i. City Property
ii. Private Property
b. Transitional
i. Participate with the Housing Inventory Count and identify available bed within our community.
ii. Facilitate partnerships that improve the number of beds available in our community.
Packet Pg. 83
Attachment: Shelter Crisis Action Plan (4.2(c)--Shelter Crisis Annual Report) c. Permanent
i. Tax Credit Developments
ii. CDBG‐DR‐MHP
iii. Pursue other federal and state funding sources.
IV. REGULATORY/LEGISLATIVE
a. Annual Report
i. The total number of residents in homeless shelters within the city, county, or city and county.
ii. The total number of residents who have moved from a homeless shelter into permanent supportive housing within the city, county, or city and county.
iii. The estimated number of permanent supportive housing units. iv. The number of residents who have exited the system and are no longer in need of a homeless shelter or permanent supportive housing within the city, county, or city and county.
v. The number and bed capacity of new homeless shelters built pursuant to this section within the city, county, or city and county. The information regarding the bed capacity shall be included in reports due by January 1, 2022, and by January 1 of each year thereafter. Bed capacity shall not include the parking vehicle capacity of a homeless shelter on a parking lot owned or leased by a city, county, or city and county specifically identified as one allowed for safe parking by homeless and unstably housed individuals.
vi. New actions the city, county, or city and county is taking under the declared shelter crisis to better serve the homeless population and to reduce the number of people experiencing homelessness.
vii. The ordinance and any associated findings adopted by the city, county, or city and county pursuant to paragraph (2).
b. Monitor federal and state legislative actions, laws and resources.
Packet Pg. 84
Attachment: Shelter Crisis Action Plan (4.2(c)--Shelter Crisis Annual Report) TITLE 2. GOVERNMENT OF THE STATE OF CALIFORNIA [8000 - 22980] ( Title 2 enacted by Stats. 1943, Ch. 134. )
DIVISION 1. GENERAL [8000 - 8899.72] ( Division 1 enacted by Stats. 1943, Ch. 134. ) 8698.4.
GOVERNMENT CODE - GOV
CHAPTER 7.8. Shelter Crisis [8698 - 8698.4] ( Chapter 7.8 added by Stats. 1987, Ch. 1116, Sec. 2. ) (a) Notwithstanding any other provision in this chapter, upon a declaration of a shelter crisis by a local jurisdiction specified in subdivision (c), the following shall apply to the respective city, county, or city and county during a shelter crisis:
(1) Emergency housing may include homeless shelters for the homeless located or constructed on any land owned or leased by a city, county, or city and county, including land acquired with low- and moderate-income housing funds. (2) (A) (i) The city, county, or city and county, in lieu of compliance with local building approval procedures or state housing, health, habitability, planning and zoning, or safety standards, procedures, and laws, may adopt by ordinance reasonable local standards and procedures for the design, site development, and operation of homeless shelters and the structures and facilities therein, to the extent that it is determined at the time of adoption that strict compliance with state and local standards or laws in existence at the time of that adoption would in any way prevent, hinder, or delay the mitigation of the effects of the shelter crisis.
The Department of Housing and Community Development shall review and approve the city’s, county’s, or city and county’s draft ordinance to ensure it addresses minimum health and safety standards. The department shall, as set forth in Section 9795, provide its findings to the Senate Committee on Housing and the Assembly Committee on Housing and Community Development within 90 calendar days of receiving the draft ordinance.
(ii) During the shelter crisis, except as provided in this section, provisions of any housing, health, habitability, planning and zoning, or safety standards, procedures, or laws shall be suspended for homeless shelters, provided that the city, county, or city and county has adopted health and safety standards and procedures for homeless shelters consistent with ensuring minimal public health and safety and those standards are complied with. Landlord tenant laws codified in Sections 1941 to 1942.5, inclusive, of the Civil Code providing a cause of action for habitability or tenantability shall be suspended for homeless shelters, provided that the city, county, or city and county has adopted health and safety standards for homeless shelters and those standards are complied with. During the shelter crisis, the local and state law requirements for homeless shelters to be consistent with the local land use plans, including the general plan, shall be suspended.
(B) This section applies only to a public facility or homeless shelters reserved entirely for the homeless pursuant to this chapter. (3) Homeless shelters constructed or allowed under this chapter shall not be subject to the Special Occupancy Parks Act (Part 2.3 (commencing with Section 18860) of Division 13 of the Health and Safety Code), the Mobilehome Parks Act (Part 2.1 (commencing with Section 18200) of Division 13 of the Health and Safety Code), or the Mobilehome Residency Law (Chapter 2.5 (commencing with Section 798) of Title 2 of Part 2 of Division 2 of the Civil Code). (4) The California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) shall not apply to actions taken by a state agency or a city, county, or city and county, to lease, convey, or encumber land owned by a city, county, or city and county, or to facilitate the lease, conveyance, or encumbrance of land owned by the local government for, or to provide financial assistance to, a homeless shelter constructed or allowed by this section. (5) (A) Except as provided in subparagraph (B), on or before July 1, 2019, the city, county, or city and county shall develop a plan to address the shelter crisis, including, but not limited to, the development of homeless shelters and permanent supportive housing, as well as onsite supportive services. The city, county, or city and county shall make the plan publicly available.
Attachment 2
Packet Pg. 85
Attachment: State of California Government Code Section 8698.4(a)(6) (4.2(c)--Shelter Crisis Annual Report) (B) Notwithstanding subparagraph (A), in the case of a shelter crisis declared by the County of Alameda, a city located within the County of Alameda, the County of Orange, a city located within the County of Orange, or the City of San Jose, the county or the city, as applicable, shall develop the plan required by this paragraph on or before July 1, 2020, and shall include in the plan required by this paragraph a plan to transition residents from homeless shelters to permanent housing. (6) (A) Except as provided in subparagraph (B), on or before January 1, 2019, and annually thereafter until January 1, 2023, if the city, county, or city and county has declared a shelter crisis, the city, county, or city and county shall report all of the following to the Senate Committee on Housing and the Assembly Committee on Housing and Community Development:
(i) The total number of residents in homeless shelters within the city, county, or city and county. (ii) The total number of residents who have moved from a homeless shelter into permanent supportive housing within the city, county, or city and county.
(iii) The estimated number of permanent supportive housing units. (iv) The number of residents who have exited the system and are no longer in need of a homeless shelter or permanent supportive housing within the city, county, or city and county.
(v) The number of new homeless shelters built pursuant to this section within the city, county, or city and county. (vi) New actions the city, county, or city and county is taking under the declared shelter crisis to better serve the homeless population and to reduce the number of people experiencing homelessness. (B) Notwithstanding subparagraph (A), in the case of a shelter crisis declared by the County of Alameda, a city located within the County of Alameda, the County of Orange, a city located within the County of Orange, or the City of San Jose, the county or the city, as applicable, shall provide the first report required by this paragraph on or before January 1 of the year following the declaration of a shelter crisis.
(b) For purposes of this section, the following terms have the following meanings:
(1) “Homeless shelter” means a facility with overnight sleeping accommodations, the primary purpose of which is to provide temporary shelter for the homeless that is not in existence after the declared shelter crisis. A temporary homeless shelter community may include supportive and self-sufficiency development services. (2) “Permanent supportive housing” means housing for people who are homeless, with no limit on length of stay, and that is linked to onsite or offsite services that assist the supportive housing resident in retaining the housing, improving the person’s health status, and maximizing the person’s ability to live and, when possible, work in the community. (c) This section shall apply to a shelter crisis declared by any of the following jurisdictions:
(1) The following cities:
(A) The City of Berkeley.
(B) The City of Emeryville.
(C) The City of Los Angeles.
(D) The City of Oakland.
(E) The City of San Diego.
(F) The City of San Jose.
(G) Any city located within the County of Alameda.
(H) Any city located within the County of Orange.
(2) The following counties:
(A) The County of Alameda.
(B) The County of Orange.
Attachment 2
Packet Pg. 86
Attachment: State of California Government Code Section 8698.4(a)(6) (4.2(c)--Shelter Crisis Annual Report) (C) The County of Santa Clara.
(3) The City and County of San Francisco.
(d) This section shall remain in effect only until January 1, 2023, and as of that date is repealed. (Amended by Stats. 2019, Ch. 336, Sec. 1. (AB 143) Effective September 26, 2019. Repealed as of January 1, 2023, by its own provisions.)
Attachment 2
Packet Pg. 87
Attachment: State of California Government Code Section 8698.4(a)(6) (4.2(c)--Shelter Crisis Annual Report) Office of the City Manager
Barry Tippin, City Manager
Sheri DeMaagd, Assistant City Manager
December 21, 2022
Erin Riches
Chief Consultant
State of California Senate Committee on Housing
State Capitol, Room 2209
Sacramento, CA 95814
Lisa Engel
Chief Consultant
State of California Assembly Committee on Housing and Community Development 1020 N Street, Room 156
Sacramento, CA 95814
RE: City of Redding Shelter Crisis Declaration – First Annual Status Report Pursuant to Government Code 8698.4(a)(6)
Dear Ms. Riches and Ms. Engel,
On June 15, 2021, the City of Redding (City) declared a shelter crisis pursuant to Government Code 8698.4. This is the City’s first status report to the State of California Senate Committee on Housing and the Assembly Committee on Housing and Community Development, as required by Government Code 8698.4(a)(6), outlining its progress in addressing its shelter crisis.
The Housing Authority of the City and the City’s Housing Division have provided the majority of the data for Fiscal Year 2021-22. Data sources include the Homeless Management Information System (HMIS) and the NorCal Continuum of Care Housing Inventory Count (HIC).
Pursuant to Government Code 8698.4(a)(6) the following questions (i) through (vi) must be reported annually by January 1st of each year:
(i) The total number of residents in homeless shelters within the city, county, or city and county.
The total number of residents in homeless shelters within the City of Redding (City) and Shasta County (County): 376.
Source: 2022 Shasta County PIT Count Report and 2022 Shasta County HIC Report.
Packet Pg. 88
Attachment: COR 2022 Annual Status Report to the State of CA Shelter Crisis (4.2(c)--Shelter Crisis Annual Report) There are 976 shelter beds in the County (including Emergency Shelter, Transitional Housing, Permanent Supportive Housing, and Rapid Re-Housing beds). Of these, 100 percent are in facilities that participate in HMIS and report having served 630 people in FY 2021-22.
The number of shelter beds in the City increased by 91 from the previous year. This can be attributed to the City’s investment in additional shelter beds under programs such as No Boundaries (76 beds) and Pathways to Housing (15 beds).
No Boundaries, a new interim housing facility with 76 beds was secured in FY 2021-22.
Pathways to Housing with 15 beds was constructed in 2022. (ii) The total number of residents who have moved from a homeless shelter into permanent supportive housing within the city, county, or city and county.
The total number of residents who moved from a homeless shelter into permanent supportive housing within the City: 45.
Source: HMIS and Housing Pro.
The Redding Housing Authority was allocated a total of 70 Veterans Affairs Supportive Housing (VASH) Vouchers. As of December 1, 2022, there are 45 active leases on the program. (iii) The estimated number of permanent supportive housing units in the County.
Total estimated number of PSH units: 171
Source: 2022 Shasta County HIC Report
This number includes units in City-funded PSH housing developments, scattered site PSH units, and units that do not participate in HMIS.
(iv) The number of residents who have exited the system and are no longer in need of a homeless shelter or permanent supportive housing within the city, county, or city and county.
The number of residents who have exited the system and are no longer in need of a homeless shelter or PSH within the City: 128.
Source: HMIS
This number is based on persons reported in HMIS as having left a shelter or PSH unit within the City for unassisted permanent housing, such as family reunification or unassisted rental housing.
The Redding Housing Authority was allocated a total of 64 Emergency Housing Vouchers. As of December 1, 2022, there are 63 active leases on the program (98 percent utilization). (v) The number of new homeless shelters built pursuant to this section within the city, county, or city and county.
The number of new homeless shelters built pursuant to this section within the City: 3 Source: City Manager’s Office
Packet Pg. 89
Attachment: COR 2022 Annual Status Report to the State of CA Shelter Crisis (4.2(c)--Shelter Crisis Annual Report) Three Emergency Housing Sites are in progress: one is under construction and two are identifying their operational funding sources with the intent to open in early 2023, for an additional 23 shelter beds (Mark Street – 8 beds, Goodwater Crossing – 4 beds, Good News Rescue Mission – 11 beds).
(vi) New actions the City is taking under the declared shelter crisis to better serve the homeless population and to reduce the number of people experiencing homelessness.
Since declaring a shelter crisis, the City has allocated a total of more than $875,927 to the Crisis Intervention Response Team, No Boundaries, RABA/United Way partnership (TBD), Pallet Shelters, and Emergency Housing Site infrastructure. This funding includes:
• $294,360 from the City’s State of California Permanent Local Housing Assistance Program (PLHA) grant allocation for capital and operating costs; • $53,812 in City Successor Housing Agency dollars allocated for capital costs and camp/property clean-up/mitigation costs and emergency housing site infrastructure; • $377,267 from the City’s Federal Emergency Shelter Grant (ESG) - for capital and Crisis Intervention Response Team operating costs;
• $150,488 from the City’s Federal Community Development Block Grant (CDBG) - COVID for capital costs and pallet shelters;
The City reached an agreement with the County of Shasta (County) to administer the State of California Homeless Housing and Incentive Program (HHIP) grant allocation for $7,337,448.
Administrative costs for the grant equals $1,100,470.
The City is in the process of negotiating an agreement with the County to allocate funds to be utilized for operating costs associated with the previously noted Emergency Housing Sites.
The City is the process of negotiating an agreement with the County to allocate between $400,000 and $700,000 to assist with infrastructure costs associated with developing units for unsheltered individuals suffering from mental illness.
For purposes of this section, the following terms have the following meanings:
(1) “Homeless shelter” means a facility with overnight sleeping accommodations, the primary purpose of which is to provide temporary shelter for the homeless that is not in existence after the declared shelter crisis. A temporary homeless shelter community may include supportive and self-sufficiency development services.
(2) “Permanent supportive housing” means housing for people who are homeless, with no limit on length of stay, and that is linked to onsite or offsite services that assist the supportive housing resident in retaining the housing, improving the person’s health status, and maximizing the person’s ability to live and, when possible, work in the community.
Packet Pg. 90
Attachment: COR 2022 Annual Status Report to the State of CA Shelter Crisis (4.2(c)--Shelter Crisis Annual Report) If you have any questions or need additional information, please contact Steve Bade, Assistant City Manager at [email protected].
Sincerely,
Barry Tippin
City Manager
Packet Pg. 91
Attachment: COR 2022 Annual Status Report to the State of CA Shelter Crisis (4.2(c)--Shelter Crisis Annual Report)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Schedule No. 5139 (Job Nos. 4006-20 and 4010- 20) for furnishing Electric Utility trench and excavation work:
(1) Approve an increase of $500,000 to the bid schedule budget; and (2) Authorize the City Manager, or designee, to approve change orders up to, and not to exceed, the total budget of $1,012,330.
Fiscal Impact
Staff anticipates the requested increase of $500,000 for the remainder of the June 30, 2023, term will be sufficient based on the latest available information, including ongoing projects and historical usage.
ANNUAL COST SUMMARY
Item Amount
Original base budget $465,830
Original contingency $46,500
Requested increase $500,000
Total Revised Bid Schedule Budget $1,012,330
Adequate funds are available within the Electric Department General System Improvements budget to cover the requested increase. Additional appropriations may be requested as part of the Fiscal Year 2023 mid-year budget review if required.
Alternative Action
The City Council (Council) could choose not to adopt the recommendation and provide staff with an alternative direction.
MEETING DATE: December 20, 2022
ITEM NO. 4.5(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.5(a)--Authorize Modifications to Bid Schedule No. 5139, Electric Utility Trench and Excavation Work
Nick Zettel, Director of
Redding Electric Utility
Packet Pg. 92
Report to Redding City Council December 15, 2022
Re: 4.5(a)--Bid Schedule No. 5139, Trench and Excavation Work Page 2 Background/Analysis
The Electric Department utilizes an on-call excavation contractor to support new development, repairs, and rebuilds of electric utility facilities. Iron Mountain General Engineering, Inc., (Iron Mountain) has provided these services to the City of Redding (City) for over five years.
Historically, annual trench and excavation costs have been less than $400,000, and the Electric Department has not utilized the total budgeted amount.
On July 21, 2020, the Council awarded Bid Schedule No. 5139, for Electric Utility Trench and Excavation, to Iron Mountain for $465,830 through June 30, 2021, with a $46,500 contingency and the ability to extend the contract two additional times for a period of one-year each. The awarded annual amount accounted for large projects planned for the fiscal year. This current fiscal year, however, the cost of relocating the electric distribution system has been higher than was initially estimated.
On July 19, 2022, the Council awarded Bid Schedule No. 5290 for Bechelli ATP, which required extensive electrical utility infrastructure relocations and upgrades. Since most of the electrical infrastructure is under the streets and sidewalks, the electrical upgrades and relocation work must be completed prior to finishing the project.
As of November 4, 2022, $440,763.53 of the current contract with Iron Mountain has been exhausted. Most of the excavation work has been for Bechelli ATP, and an estimated $400,000 worth of work remains. The requested addition of $500,000, combined with the existing $46,500 contingency, should be sufficient to complete the planned projects and support emergency repairs through the end of the contract on June 30, 2023.
The Electric Department will solicit new bids for excavation services for Fiscal Year 2023-24.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required at this time. Each future project conducted under this contract is subject to CEQA review.
On July 19, 2022, the City Council determined that the Bechelli ATP was categorically exempt from review under the CEQA Guidelines, per Section 15301(c) – Existing Facilities. On March 21, 2019, Caltrans determined that the Bechelli ATP was categorically excluded from review under the National Environmental Policy Act (NEPA).
Council Priority/City Manager Goals
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” Attachments
Previous Staff Report - Item No. 4.11(c)--Award Bid Schedule No. 5290 for Bechelli ATP Previous Staff Report - Item No. 4.5(b)--Award Bid Schedule No. 5139 Electric Utility Trench and Excavation
Packet Pg. 93
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Schedule No. 5290 (Job No. 2606) Bechelli Lane Improvements Active Transportation Project:
(1) Award to Tullis, Inc. in the amount of $9,463,617.46; (2) Approve an additional $745,000 to cover the cost of administration and inspection fees and $1,095,000 for project development costs;
(3) Approve $950,000 to provide construction contingency funding; (4) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $75,000; and (5) Find that the project is categorically exempt from review under the California Environmental Quality Act Guidelines, per Section 15301(c) - Existing Facilities.
Fiscal Impact
The Bechelli Lane Improvements (ATP) Project (Project) is being funded by multiple sources which consist of a grant in the amount of $6,740,000 from the State of California Active Transportation Program (ATP), $3,341,057 in Local Street and Road funds, $500,000 in American Rescue Plan Act funding dedicated to storm drain improvements, $300,000 in Water funds, $423,770 in Wastewater funds and $1,023,790 in Redding Electric Utility funds.
Cost Summary
Item Estimated
Project Development Costs $1,095,000
Construction Contract + Contingency $10,413,617.46
Contract Administration, Inspection, Testing $745,000
Additional City Manager Authority $75,000
Total Project Costs $12,328,617.46
Project cost components are estimates and some shifting of the project development, MEETING DATE: July 19, 2022
ITEM NO. 4.11(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(c)--Award Bid Schedule No. 5290 (Job Order No. 2606) for the Bechelli Lane Improvements Active Transportation Project
Chuck Aukland, Public
Works Director
Packet Pg. 94
Attachment: Previous Staff Report - Item No. 4.11(c)--Award Bid Schedule No. 5290 for Bechelli ATP (4.5(a)--Bid Schedule No. 5139, Trench and Report to Redding City Council July 11, 2022
Re: 4.11(c)‐‐Award Bid Schedule No. 5290 Bechelli Lane Improvements (ATP) Page 2
construction management, and construction contingency funds may be necessary to balance the project within the approved budget.
On January 24, 2022, the City Council (Council) accepted and appropriated ATP grant funds in the amount of $6,740,000 for construction costs related to the project. In addition, the report identified funding sources for the remaining funds that would be budgeted once the bids were opened and project costs fully understood. Additional Streets Division funds are needed to fund the project. All other revenue sources are included in the current fiscal year budget.
Alternative Action
The Council may choose to not award the bid for the Bechelli Lane Improvements ATP Project and provide staff with alternative direction. Without this project, much needed pedestrian and bicycle mobility and safety improvements will not be completed, and the project may not be completed. In addition, if this project is not awarded, the City of Redding (City) is at risk of losing nearly $7 million dollars in federal funding due to grant requirements for project delivery.
Background/Analysis
The Bechelli Lane Improvements Project is a planned active transportation improvement to provide continuous sidewalk and bicycle facilities, enhanced pedestrian crossings, and other similar improvements along Bechelli Lane from Cypress Avenue to the new Costco Development, in addition to improvements along Loma Vista Avenue between Bechelli Lane and Churn Creek Road. The improvements include Americans with Disabilities Act (ADA) compliant curb ramps, sidewalk gap completion, enhanced pedestrian crossings, buffered bike lanes, functional landscaping, corridor lighting, asphalt concrete cold milling and placement, micro-surfacing, and restriping, as is detailed on the plans. This project is included in the City’s Active Transportation Plan and the Regional Transportation Plan.
Attached is a tabulation of bids received and opened on June 14, 2021, for the Bechelli Lane Improvements (ATP) Project. The low bid in the amount of $9,463,617.46 was received from Tullis, Inc., of Redding, California. The engineer's estimate was $8,649,000. Total project development costs for this project are estimated to be $1,095,000. Project development costs include engineering, surveying, right-of-way, environmental, and consultant services. The ARPA funding is dedicated to storm drain improvements and accounts for overage amounts not previously budgeted.
Staff has reviewed the project and determined that the project is Categorically Exempt from review under the California Environmental Quality Act (CEQA) Guidelines, per Section 15301(c) - Existing Facilities. Class 1 exemptions include minor alteration of existing public or private structures, facilities, or topographical features involving negligible or no expansion of use. This includes the addition of bicycle lanes and bicycle facilities, sidewalk and pedestrian crossings, transit improvements, street trees, and other similar alterations that do not create additional automobile lanes. The proposed project will enhance the existing facility for pedestrians and bicyclists, but will not create additional vehicle capacity. The project has been reviewed for sensitive resources and will not have a significant effect on biological or cultural resources such as threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The project has no potential to have a significant effect on the environment. On March 21, 2019, the California Department of Transportation (Caltrans) made a determination that the project is Categorically Excluded from Packet Pg. 95
Attachment: Previous Staff Report - Item No. 4.11(c)--Award Bid Schedule No. 5290 for Bechelli ATP (4.5(a)--Bid Schedule No. 5139, Trench and Report to Redding City Council July 11, 2022
Re: 4.11(c)‐‐Award Bid Schedule No. 5290 Bechelli Lane Improvements (ATP) Page 3
environmental review under the National Environmental Policy Act (NEPA), pursuant to 23 CFR 771.117(c)(3) - Construction of Bicycle and Pedestrian Facilities.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Bid Tabulation
^Location Map
CEQA NOE
NEPA Determination
Packet Pg. 96
Attachment: Previous Staff Report - Item No. 4.11(c)--Award Bid Schedule No. 5290 for Bechelli ATP (4.5(a)--Bid Schedule No. 5139, Trench and
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following relative to Bid Schedule No. 5139 (Job Nos. 4006-20 & 4010-20) for furnishing electric utility trench and excavation work:
(1) Award to Iron Mountain General Engineering, Inc. (Iron Mountain) of Redding, California, at the bid unit prices, for a total amount of $465,830, during the period of July 1, 2020, to June 30, 2021;
(2) Authorize the City Manager or designee to approve project construction change orders up to, and not to exceed, $46,500 (ten percent of the contract amount); and (3) If mutually agreeable, with all prices, terms, and conditions remaining the same, the contract may be extended for two additional one-year periods.
Fiscal Impact
Funds are available within the Redding Electric Department’s (REU) General System Improvements Capital Outlay budget to cover additional costs and contingency.
Alternative Action
The City Council could choose not to award and reject the bid. REU would be unable to provide timely electric utility support for residential and commercial development and would be unable to repair/rebuild existing electric facilities.
Background/Analysis
This is a bid for procurement of electric utility trench and excavation work during the period of July 1, 2020, through June 30, 2021. Trench and excavation work will be performed on an as-needed basis subject to the availability of budgeted funds. Typically, actual annual trench and excavation costs run $400,000 to $500,000. Trench and excavation work is needed to support MEETING DATE: July 21, 2020
ITEM NO. 4.5(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.5(b)--Award Bid Schedule No. 5139, Electric Utility Trench and Excavation Daniel Beans, Director of
Electric Utility
Packet Pg. 97
Attachment: Previous Staff Report - Item No. 4.5(b)--Award Bid Schedule No. 5139 Electric Utility Trench and Excavation (4.5(a)--Bid Schedule Report to Redding City Council July 15, 2020
Re: 4.5(b)‐‐Award Bid Schedule No. 5139, Electric Utility Trench and Excavation Page 2
residential and commercial development and to support repairs and rebuilds of existing electric utility facilities.
On June 9, 2020, one bid was opened for the subject trench and excavation work as shown on the attached bid tabulation form. The bid was submitted by Iron Mountain in the evaluated total of $465,830, and it is in compliance with the specifications and general conditions. The engineer’s estimate for this bid is $501,025.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
Bid Tabulation
Packet Pg. 98
Attachment: Previous Staff Report - Item No. 4.5(b)--Award Bid Schedule No. 5139 Electric Utility Trench and Excavation (4.5(a)--Bid Schedule
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the sole-source purchase of one Type III wildland engine from Golden State Fire Apparatus, Inc., for a price not to exceed $450,000, which includes inspection trips, delivery, sales tax, and a pre-payment discount.
Fiscal Impact
The Type III wildland fire engine purchase involves an expenditure not to exceed $450,000 from the Fire Department’s rolling stock account. There would be no new fiscal impact as a result of this purchase.
Alternative Action
The City Council could opt to not approve the request for this purchase and direct to the Fire Department to purchase a custom Type III fire engine at an approximate additional cost of $110,000-120,000 and a thirty-month build time.
Background/Analysis
On December 8, 2022, the Fire Department received a proposal from Golden State Fire Apparatus for one Type III fire engine. The Type III fire engine is a “stock-build engine”, meaning it has no specific modifications made for the Fire Department; it is built ready-made for delivery. The proposal represents a unique opportunity to immediately purchase the stock engine, saving approximately $110,000 to $120,000 compared to a custom build. Currently, the build time for a custom Type III engine is thirty months from the time of order.
MEETING DATE: December 20, 2022
ITEM NO. 4.8(a)
FROM:
***APPROVED BY***
[email protected] [email protected] SUBJECT: 4.8(a)--Consider purchase of Type III Wildland Engine for the City of Redding Fire Department.
Jerrod Vanlandingham, Fire
Chief
Packet Pg. 99
Report to Redding City Council December 13, 2022
Re: 4.8(a)--Authorize Purchase of Type III Wildland Engine Page 2 The stock Type III fire engine the Fire Department is requesting to purchase mirrors the engines used by Cal-Fire. Having the same equipment as Cal-Fire is advantageous when Redding Fire Department is deployed on a fire with Cal-Fire as the mechanics would be able to fix and replace parts on site. It is the recommendation of the Fire Department going forward to only purchase stock Type III fire engines for the above reasons.
Upon delivery and placement in service, the Type III fire engine will replace a 1994 Type III wildland fire engine. Fire engines of this age are increasingly unreliable and are recommended for surplus.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
• Public Safety – "Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding." • Budget and Financial Management – "Achieve balanced and stable 10—year Financial Plans for all funds."
• Government of the 21st Century – "Be relevant and proactive to the opportunities and challenges of today's residents and workforce. Anticipate the future to make better decisions today."
Attachments
Golden State Fire Apparatus Formal Proposal
Packet Pg. 100
P
ROPOSALPREPAREDFOR
City of Redding
Boise Mobile Equipment
Freightliner Type 3 Engine
HGAC Member #14-4209
December 8, 2022
SALESCONSULTANT
JonBauer
GoldenStateFireApparatus, Inc.
7400 ReeseRoad
Sacramento, CA 95828
916.330.1638Office
530.351.2151 Cell
[email protected]
PARTS, SERVICE&SUPPORT
GoldenStateEmergencyVehicleService, Inc.
7400 ReeseRoad
Sacramento, CA 95828
916.330.1638Office
[email protected]
Packet Pg. 101 Attachment: Golden State Fire Apparatus Formal Proposal (4.8(a)--Authorize Purchase of Type III Wildland Engine) Submitted Date: December 8, 2022
Proposal Number: 51208-22
Expiration Date: December 31, 2022 OR
UNIT IS SOLD
Sales Consultant: Jon Bauer
www.goldenstatefire.com
7400 Reese Road
Sacramento, CA 95828
Office 916.330.1638
Fax 916.330.1649
PROPOSAL PREPARED FOR:
City of Redding Fire Department
777 Cypress Avenue
Redding, CA 96001
Pursuant to this proposal (the “Proposal”), Golden State Fire Apparatus, Inc. (“GSFA”) hereby proposes to furnish the CITY OF REDDING (“Customer”), the following fire apparatus and equipment, hereinafter called the “Product”:
PAYMENT AT TIME OF ORDER
PROPOSAL SUMMARY
This Proposal includes the following items in accordance with the specifications hereto attached:
▪ Fire apparatus and equipment
▪ Factory final inspection
▪ Delivery to GSFA service center in Sacramento
▪ Pre-delivery inspection/services by GSFA
▪ Delivery to GSFA service center in Sacramento
▪ Final delivery from service centerto Customer
▪ California Tire Fee
PRODUCT COMPLETION
The Product shall be built in accordance with the specifications hereto attached. Product is completed and is available on a “first come, first served” basis to the first entity to issue a purchase order. Customer’s acceptance of this Proposal, subject to the force majeure provisions contained in the Purchase Agreement (defined below). The Purchase Agreement shall further describe the delivery schedule for the Product.
DELIVERY LOCATION
Product shall be shipped in accordance with the specifications hereto attached and be delivered to you at REDDING, CALIFORNIA. Prior to final delivery of the Product to Customer, Customer agrees to provide proof of liability and physical damage insurance to GSFA. GSFA shall not deliver the Product until such proof of insurance is provided. # Description Unit Price
A
One (1) BME/ Freightliner Type 3 Engine STOCK UNIT 3567 (BME/ HGAC Contract FS12-19) 397,005.40
7.25%
State Sales Tax 28,782.89
California Tire Fee 10.50
GRAND TOTAL 425,798.79
Packet Pg. 102 Attachment: Golden State Fire Apparatus Formal Proposal (4.8(a)--Authorize Purchase of Type III Wildland Engine)
ACCEPTING THIS PROPOSAL
In the event Customer wishes to purchase the Product described in this Proposal and the attached specifications, then, prior to the expiration date listed on page 2 of this Proposal, Customer shall sign and return this Proposal. Thereafter, GSFA and Customer will endeavorto enter into a purchase agreement incorporating this Proposal and including additional terms (a “Purchase Agreement”). If Customerreturns a signed copy of this Proposal alone, GSFA will send Customerits form of Purchase Agreement for Customer’s review and signature. If Customer desires to use its standard form of purchase order as the Purchase Agreement, then Customer should return a signed copy of this Proposal along with a copy of such purchase order. All purchase orders shall be made outto GSFA. GSFA will review such purchase order and contact the Customer regarding any required revisions. Only upon a full execution of a Purchase Agreement shall GSFA and Customer be obligated to purchase and sell the Product set forth in this Proposal.
TERMS AND CONDITIONS
The following Terms and Conditions are hereby made part of this Proposal:
1. Payment Terms, Paymentwithin 30 Calendar Days of
Contract Signing – Customer shall pay the Grand Total within 30 Calendar Days of Contract Signing to GSFA. It is the responsibility of the Customer to have full paymentready within this timeframe.
If payment is late or delivery is delayed pending payment, a daily finance charge of $150.00 and a daily storage fee of $50.00 may apply until such payment is received. Due to insurance liability, the Product(s) will not be left atthe Customer’s location without full acceptance and payment or prior written agreement between the Customer and GSFA.
2. Multiple Unit Purchase – If the Purchase Price includes pricing for multiple units, the price stated on this Proposal shall only be valid if the quantity of Products being proposed are purchased at the same time, pursuant to the same Purchase Agreement.
3. Stock / Demo Units – If applicable, any stock/demo units, including those identified by this Proposal, are available for sale on an as-is, first-come and first served-basis. Regardless of this Proposal, the first Customer to enterinto a Purchase Agreement identifying any such stock/demo unites shall obtain said units.
4. Order Changes – The Customer may request that GSFA
incorporate a change to the Product or the Specifications for the Product by delivering a written change order to GSFA, which shall include a description of the proposed change sufficient to permit GSFA to evaluate the feasibility of such change (a “Change Order”). GSFA will provide Customer a written response (a “Response”) stating (i) whether GSFA will accommodate such Change Order (which GSFA may decide in its sole and absolute discretion) and (ii) the terms of the modification to the order, including any increase or decrease in the Purchase Price resulting from such Change Order, and any effect on production scheduling or Delivery resulting from such Change Order. Customer shall have seven (7) days after receipt of the Response to notify GSFA as to whether Customer desires to make the changes GSFA has approved in the Response. In the event Customer counter-signs GSFA’s Response, Customer shall pay the increase (or be refunded the decrease) in the Purchase Price prior to final delivery to Customerlocation.
5. Force Majeure – GSFA shall not be responsible nor deemed to be in default on account of delays in performance due to causes which are beyond GSFA’s and manufacturer’s control and which make GSFA’s performance impracticable, including but not limited to wars, insurrections, strikes, riots, fires, storms, floods, other acts of nature, explosions, earthquakes, accidents, any act of government, delays in transportation, inability to obtain necessary labor supplies or manufacturing facilities, allocation regulations or orders affecting materials, equipment, facilities or completed products, failure to obtain any required license or certificates, acts of God or the public enemy or terrorism, failure of transportation, epidemics, quarantine restrictions, failure of vendors (due to causes similar to those within the scope of this clause) to perform their contracts or labor troubles causing cessation, slowdown, or interruption of work.
6. Cancellation/Termination – In the event Customer and GSFA enter into a Purchase Agreement and Customer thereafter cancels or terminates the Purchase Agreement, GSFA will charge a cancellation fee as follows: (a) 10% of the Purchase Price after order is accepted and entered by GSFA; (b) 20% of the Purchase Price after completion of the pre-construction phase of the order process; and (c) 50% of the Purchase Price afterthe requisition of any materials or commencement of any manufacturing or
assembly of the Product by either GSFA or the manufacturer of the Product. The tier of cancellation fee applicable to any cancellation shall be in the sole and absolute discretion of GSFA.
7. State Sales Tax – Customer shall be responsible for the cost of state sales tax associated with, or attributable to the Product. The taxes owed by Customerfor the Product is subject to adjustment for the applicable state sales tax rate in effect when the Product is delivered to the Customer. Therefore, the sales tax will be increased or decreased at the time of delivery if a change in the sales tax rate has occurred, in which case Customer shall pay GSFA (or be refunded by GSFA) the applicable change in sales tax.
8. Proposal Expiration – After the Expiration Date shown on page one of this Proposal, Customer shall require GSFA’s written consent to accept this Proposal.
9. GoverningLaw – This Proposal is to be governed by and under the laws of the state of California.
Packet Pg. 103 Attachment: Golden State Fire Apparatus Formal Proposal (4.8(a)--Authorize Purchase of Type III Wildland Engine) Thank you for providing Golden State Fire Apparatus, Inc. with the opportunity to provide this proposal. If you have any questions regarding the options presented or need additional options, please contact me.
Sincerely,
Jon Bauer
Golden State Fire Apparatus, Inc.
7400 Reese Road
Sacramento, CA 95828
Office 916.330.1638
I, __________________________________________authorized representative of CITY OF REDDING agrees to purchase the proposed Product(s) and agree to the terms and conditions of this proposal and the specifications hereto attached.
SIGNATURE:
TITLE: DATE:
Packet Pg. 104 Attachment: Golden State Fire Apparatus Formal Proposal (4.8(a)--Authorize Purchase of Type III Wildland Engine)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Request for Proposal (RFP) Schedule No. 5319, Architectural Services for the Fire Stations Assessment and Modernization Project:
(1) Award to Nichols, Melburg and Rossetto (NMR);
(2) Authorize the Mayor to execute a Consulting and Professional Services Contract with NMR for an amount not to exceed $297,950; and
(3) Authorize the City Manager, or designee, to approve any amendments up to $30,000.
Fiscal Impact
On April 19, 2022, the City Council budgeted $5 million to provide funding for initial efforts associated with architectural review and design services. Phase 1 architectural services for the development of a Fire Station Assessment report is estimated to be $400,000 including NMR’s fee, contingency, and staff resources.
Alternative Action
The City Council (Council) may choose not to award the contract to NMR and provide staff with an alternate direction.
Background/Analysis
The City of Redding (City) proposes to issue approximately $25 million in debt obligations to finance the land acquisition, construction, and improvement of the following Fire Department facilities:
• Fire Stations 1 through 8 – These stations have varying needs for modernization to improve safety, reliability, and functionality. Needed improvements include minor remodels, expansion, and personal protective equipment storage and containment.
MEETING DATE: December 20, 2022
ITEM NO. 4.11(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(a)--Award of Request for Proposal Schedule No. 5319 , Architectural Services for the Fire Stations Assessment and Modernization Project.
Chuck Aukland, Public
Works Director
Packet Pg. 105
Report to Redding City Council December 9, 2022
Re: 4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment Page 2 • Fire Station 9 (New) – Staff has identified a need for a new station near the Shasta View Corridor, which would significantly reduce response times in east Redding.
Architectural services for the Fire Station Assessment and Modernization Project will be broken into two phases. Phase 1, as outlined in the attached Consulting and Professional Services Agreement, includes project management, fire station data collection, field reviews, and environmental scoping culminating in a Fire Station Assessment Report. The report will identify safety and operational deficiencies and provide alternatives and costs to address these items. The report will also provide sufficient information for the City to prioritize and fund future projects to implement.
If the City is satisfied with NMRs’ services at the completion of Phase 1 (expected summer of 2023), then staff will return to the Council and recommend authorization of an amendment with NMR to add Phase 2 architectural design services. Phase 2 services will implement project development and design services required to deliver the capital construction projects identified and recommended for funding and implementation. Otherwise, a separate Request for Proposals (RFP) will be required for Phase 2 architectural design services.
CONSULTANT SELECTION PROCESS
The City must contract with qualified architectural firms to develop the Fire Stations Assessment Report. The City issued a formal RFP on August 19, 2022, for the required services, and five proposals, including fees in sealed envelopes, were received and opened on September 22, 2022.
Unfortunately, two firms did not follow the appropriate RFP requirements, with regards to registration with the Department of Industrial relations prior to submitting proposals, and those proposals were deemed non-responsive.
A review and selection panel was formed with four staff members from the Fire Department, Public Works Engineering, and Building Maintenance divisions. The panel’s evaluation was based on the consultants’ ability and qualifications to perform all phases of the engineering services that will be required, including both Phases 1 and 2.
The panel members evaluated and scored each proposal based on the RFP selection criteria including the consultants’ understanding of the project scope, project approach, team experience with similar fire station modernization and design, qualifications of the project manager and team with the City’s project requirements, ability to complete projects on time and within budget, and the teams’ location. After reviewing the proposals, the panel elected to interview all three of the firms that submitted responsive proposals.
Oral interviews were held on October 27 and 28, 2022, at City Hall. Each consultant team was allowed 45 minutes to provide a presentation and answer the City’s questions. Review Panel members evaluated and scored each consultant team based on its presentation and responses to the questions.
After the oral interviews, the review panel:
• Combined scores from the consultants’ proposals and oral interview to determine the overall score.
• Ranked consultants based on their overall score.
Packet Pg. 106
Report to Redding City Council December 9, 2022
Re: 4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment Page 3 The panel ranked the firms as follows:
Rank Firm Fee
1 NMR $297,950
2 COAR $687,925
3 Rubio Medina $364,386
- Trilogy DLR Group Non-responsive
- ORW Architecture Non-responsive
Applying the evaluation criteria to the proposals and oral interview scoring, it is the opinion of the selection panel that NMR is the most qualified team to provide the required services.
The RFP is a qualification-based selection process. Following the proposal review, staff evaluated the fee proposal and determined the proposed fees are consistent with pre-proposal estimates and provide good value for the services included. Additionally, NMR’s proposed fee happened to be the lowest received.
The attached Consultant and Professional Services Agreement has been approved to form by the City Attorney.
Environmental Review
Consultant selection is not a project as defined under the California Environmental Quality Act (CEQA), and no further action is required. The consultant and City staff will provide design and technical study information necessary to ensure environmental clearance as the project progresses.
Council Priority/City Manager Goals
• Budget and Financial Management - “Achieve balanced and stable 10-year Financial Plans for all funds.”
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” • Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
Attachments
Consultant Agreement
^Location Map
Packet Pg. 107
Packet Pg. 108
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 109
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 110
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 111
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 112
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 113
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 114
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 115
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 116
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 117
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 118
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 119
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 120
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 121
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 122
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 123
Attachment: Consultant Agreement (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment) Packet Pg. 124 Attachment: ^Location Map (4.11(a)--Award RFP SN 5319, Arch Srvcs; Fire Station Assesment)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Award the lowest competitive bids relative to Bid Schedule No. 5329, Rock and Mineral Products, to J.F. Shea, Stimpel-Wiebelhaus, and Tullis, Inc. for the annual purchase of rock, asphalt, and mineral aggregates at an estimated cost of $350,000.
Fiscal Impact
Approximately $350,000 will be spent by City of Redding (City) Departments for rock, asphalt, and mineral aggregate materials during the fiscal year. Funding for these materials is routinely allocated in the various maintenance divisions’ budgets.
Alternative Action
The City Council (Council) may choose not to award the contracts for rock, asphalt, and mineral products. In the event the Council chooses to not award these contracts at this time, staff would have to call on a weekly basis for competitive prices on the material needed to complete maintenance projects. This would increase administrative costs and could cause disruption in work schedules if crews have to wait for material deliveries.
Background/Analysis
Attached is a tabulation of bids received and opened on Tuesday, November 1, 2022, for rock, asphalt, and mineral aggregate products for the period of January 1, 2023, through December 31, 2023. The solicitation is completed annually, and the purchase of these products is made as needed for maintenance divisions engaged in various types of infrastructure repairs. The estimated annual purchase for all City divisions is expected to be roughly $350,000. Funds are budgeted annually in several divisions for these purchases.
MEETING DATE: December 20, 2022
ITEM NO. 4.11(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(b)--Award Bid Schedule No. 5329, Rock and Mineral Products Chuck Aukland, Public
Works Director
Packet Pg. 125
Report to Redding City Council December 13, 2022
Re: 4.11(b)--Award Bid Schedule No. 5329 Rock and Mineral Products Page 2 Sixteen (16) bid opportunity announcements were distributed by staff to potential vendors, in addition to posting the bid on the City's website and advertising in the Record Searchlight. Five (5) bid proposals were received. The recommendation is to award by line item to the lowest bidder for each line item in the proposal.
Rock and mineral products are purchased by various City departments, the majority is purchased by the Streets Division for roadway maintenance. The low bid for each item is as follows:
Company Bid Item Numbers
J.F. Shea 9-15, 17, 19-41, 50-54, 61-62, 72, 74-76
Stimpel-Wiebelhaus 15, 42, 64-65
Tullis, Inc. 1-8, 15-16, 18, 42-49, 54-60, 66-71, 73, 76 Environmental Review
This action is not a project as defined under the California Environmental Quality Act (CEQA), and no further action is required.
Council Priority/City Manager Goals
• This is a routine operational item.
c: Amber Edenburn, Purchasing Division
Attachments
^Bid Tab
Packet Pg. 126
Packet Pg. 127 Attachment: ^Bid Tab (4.11(b)--Award Bid Schedule No. 5329 Rock and Mineral Products) Packet Pg. 128 Attachment: ^Bid Tab (4.11(b)--Award Bid Schedule No. 5329 Rock and Mineral Products) Packet Pg. 129 Attachment: ^Bid Tab (4.11(b)--Award Bid Schedule No. 5329 Rock and Mineral Products) Packet Pg. 130 Attachment: ^Bid Tab (4.11(b)--Award Bid Schedule No. 5329 Rock and Mineral Products)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Accept the City of Redding Mitigation Fee Act Report Update, including an accounting of development fees; and adopt Resolution making findings concerning unexpended funds.
Fiscal Impact
The Mitigation Fee Act Report Update (Report) for Fiscal Year 2021–22 accounts for $25 million in Development Impact Fees. There is no direct fiscal impact in accepting this report other than the staff time necessary for preparation.
Alternative Action
The City Council (Council) may choose to not accept the Report, thereby not making the required finding, and provide alternative direction to staff. Without the finding, the Impact Fee Program as currently adopted will be abandoned and the collected monies may need to be refunded.
Background/Analysis
The City of Redding (City) collects a wide range of impact fees from development projects. The fees are utilized to construct various public capital improvements that mitigate the burden new development has on the City’s infrastructure systems. California Government Code §66000, et seq., defines specific reporting requirements to provide the public an annual account of revenues and expenditures associated with the various impact fee programs.
To meet these requirements, staff has prepared a Mitigation Fee Act Report Update for Fiscal Year 2021–22. The annual Report must be available to the public within 180 days of the end of the fiscal year. A public notice of the availability of the Report was published in the Record Searchlight on December 5, 2022.
MEETING DATE: December 20, 2022
ITEM NO. 4.11(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(c)--Accept Mitigation Fee Act Report Update and Adopt Resolution Making Findings Concerning Unexpended Funds.
Chuck Aukland, Public
Works Director
Packet Pg. 131
Report to Redding City Council December 9, 2022
Re: 4.11(c)--Mitigation Fee Act Report Update Page 2
Required Finding
The Council must make the finding that the Report meets the reporting requirements set forth in Government Code Section 66006(b) concerning Impact Fee accounts. The requirements are that the Report contains the following:
1. A brief description of the type of fee in the account or fund. 66006(b)(1)(A)
2. The amount of the fee. 66006(b)(1)(B)
3. The beginning and ending balance of the account or fund. 66006(b)(1)(C)
4. The amount of the fees collected and the interest earned. 66006(b)(1)(D)
5. An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvements that was funded with fees. 66006(b)(1)(E)
6. An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement. 66006(b)(1)(F)
7. A description of each interfund transfer or loan, including the public improvement on which the transferred or loaned fees will be expended and, in the case of a loan, when the loan will be repaid and the rate of interest the loan will receive. 66006(b)(1)(G)
8. The amount of refunds. 66006(b)(1)(H)
The Resolution has been approved as to form by the City Attorney.
Environmental Review
This activity is not a project as defined under the California Environmental Quality Act (CEQA), and no further action is required. Acceptance of the report will allow the City to conduct project specific environmental review for future City infrastructure projects funded by the impact fee program.
Council Priority/City Manager Goals
• Communication and Transparency – “Improve the quality of communication with the public and City employees to enhance knowledge and increase transparency to improve public trust.”
Attachments
^Resolution
Mitigation Fee Act Report FY 2021-22
Packet Pg. 132
RESOLUTION NO. 2022-____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
MAKING FINDINGS CONCERNING FUNDS IN THE CITY OF
REDDING’S IMPACT FEE PROGRAM
WHEREAS:
A. The City of Redding has had a range of impact fees in effect for several years; and B. California Government Code Section 66000, et seq., defines specific reporting requirements to provide for a public accounting of revenues and expenditures in the Impact Fee Program. The reporting must be available to the public within 180 days of the end of the fiscal year, and the City Council must review the information not earlier than 15 days of availability to the public. In the fifth year after funds are first deposited, and annually thereafter, the City must make certain findings concerning the status of those monies; and C. To satisfy these requirements, staff has prepared a Mitigation Fee Act Report Update for the fiscal year ended June 30, 2022 (the Report), incorporated herein by this reference. A public notice of the availability of the Report was published in the Record Searchlight newspaper on December 5, 2022; and
D. The City Council has accepted the Report on today’s date, prior to the adoption of this Resolution; and
E. All legal prerequisites to the adoption of this resolution have occurred;
NOW, THEREFORE, THE CITY COUNCIL FINDS, RESOLVES, DETERMINES, AND ORDERS AS FOLLOWS:
1. The matters set forth above are true and correct.
2. Pursuant to California Government Code Section 66001, the City Council makes the finding that all the following reporting requirements have been met concerning all the impact fee accounts with unexpended funds, as detailed in the Mitigation Fee Act Report Update for the fiscal year ended June 30, 2022:
a. A brief description of the type of fee in the account or fund. 66006(b)(1)(A) b. The amount of the fee. 66006(b)(1)(B)
c. The beginning and ending balance of the account or fund. 66006(b)(1)(C) d. The amount of the fees collected and the interest earned. 66006(b)(1)(D) Packet Pg. 133 Attachment: ^Resolution (4.11(c)--Mitigation Fee Act Report Update) e. An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvements that was funded with fees. 66006(b)(1)(E) f. An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to compete financing on an incomplete public improvement. 66006(b)(1)(F)
g. A description of each interfund transfer or loan, including the public improvement on which the transferred or loaned fees will be expended and, in the case of a loan, when the loan will be repaid and the rate of interest the loan will receive. 66006(b)(1)(G)
h. The amount of refunds. 66006(b)(1)(H)
I HEREBY CERTIFY that the foregoing resolution was introduced and adopted at a regular meeting of the City Council of the City of Redding on the 20th day of December, 2022, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
___________________________________
MICHAEL DACQUISTO, Mayor
ATTEST: FORM APPROVED:
__________________________________ ___________________________________ PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 134 Attachment: ^Resolution (4.11(c)--Mitigation Fee Act Report Update)
MITIGATION FEE ACT
REPORT UPDATE
FISCAL YEAR
2021-22
Prepared December 5, 2022
in accordance with
Government Code Section 66006(b)
Packet Pg. 135 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update)
REPORT CONTENTS
Overview.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Traffic-Related Impact Fees
Canyon Creek Road Traffic Impact Fee (128-CC Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Canyon Creek Road-Improvements (117 Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Churn Creek Rd/Alrose Ln Intersection (CC-33F Fund)). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Churn Creek Rd/Hartmeyer Ln Intersection (CC-33G Fund)). . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Citywide Traffic Impact Fee (128-563 Fund) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Dana Drive Impact Fee (128-564 Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Hartnell Avenue/Lawrence Road (HA/LR Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 North Redding Traffic Benefit District (128-565 Fund).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Shasta View Drive Extension (104 Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Shasta View Drive/College View Drive Improvements (SV Fund). . . . . . . . . . . . . . . . . . . . . . . . . 11 Traffic Signal at Airport Road/Meadowview Drive (TS-E Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Traffic Signal at Lake Boulevard/Panorama Drive (TS-A Fund).. . . . . . . . . . . . . . . . . . . . . . . . . . 13 Traffic Signal at Lake Boulevard/Santa Rosa Way (TS-D Fund). . . . . . . . . . . . . . . . . . . . . . . . . . 14 Traffic Signal at SR299 WB/Churn Creek Road (TS-F Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Traffic Signal at Victor Avenue/El Vista Street (TS-B Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Park Fees
Park and Recreation Facilities Impact Fee (128-619 Fund).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Fire Fees
Fire Facility Element (128-562-F Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Utility Fees
Storm Drainage Impact Fee (147 Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Wastewater System Impact Fee (145 Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Upper and Middle Stillwater Sewer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Water System Impact Fee (143 Fund). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Twin View Waterline (Twin View Fund) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Packet Pg. 136 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Overview
The Mitigation Fee Act Report Update provides an annual account of the collection and use of the fees collected from development projects within the City of Redding. The fees are utilized to construct various public capital improvement projects. Public capital improvement projects typically include the construction of streets, structures, park facilities, sewer lines, waterlines, storm drainage facilities, and traffic-control devices.
The purpose of this report is to make the required findings and account for the various funds to support retention of fees that have been collected. Fees collected prior to the adoption of the Development Impact Fee Ordinance, effective April 24, 2001, are accounted for in the same manner as fees collected subsequent to that date, and in accordance with the provisions of the Mitigation Fee Act.
The collection and accounting of fees is governed by Government Code Section 66006(b). Fees are deposited in separate accounts or funds established by the City of Redding’s Finance Division. Interest income earned on these monies remains with the account in support of the capital projects.
This report is the annual Mitigation Fee Act Report (FYE 2022) and is an update to the report accepted by the City Council of the City of Redding on March 1, 2022.
The following documents are incorporated herein by this reference:
- The City of Redding Capital Improvement Plan 2021-22 to 2026-2027 - Mitigation Fee Act Report, Combined Annual and Five Year Findings FYE 6/30/2001 - The North Redding Traffic Benefit District (NRTBD) Fee Study dated 8/7/2007 - The City of Redding Development Impact Mitigation Fee Nexus Study dated 8/20/2012 - The City of Redding Development Impact Mitigation Fee Nexus Study dated 12/5/2017 - Redding Municipal Code
Packet Pg. 137 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Canyon Creek Road Traffic Impact Fee 128-CCFund
The purpose of this fee was to provide for the construction of street widening, traffic signals, and bridge widenings related to new development within the Canyon Creek Road Traffic Impact Fee zone in accordance with the development forecast under the City of Redding General Plan. These improvements will also provide secondary emergency access to developed property within the district boundaries. As the amount of new development contemplated by the General Plan occurs, there will be an additional burden on the district's surface transportation system in the Canyon Creek Road traffic impact fee zone.
Without funding-identified capital improvements, there will be an unacceptable level of traffic congestion, delays, accidents, and generally reduced public safety. Air quality could be adversely affected, as has been demonstrated in other studies when idle/standing times are increased.
Fund Balance June 30, 2021 $132,811.12
6922-26
2021-22 Deposits $0.00
2021-22 Interest $93.77
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $132,904.89
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 138 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Canyon Creek Road Area Improvements 117Fund
The purpose of these fees, imposed as a condition of the development of Wheeler Estates, Whitehawk Estates, and Country Heights, was for the construction of street widening, traffic signals, and bridge widenings related to new development within the Canyon Creek Road Traffic Impact Fee zone in accordance with the development forecast under the City of Redding General Plan. These improvements will also provide secondary emergency access to developed property within the district boundaries. As the amount of new development contemplated by the General Plan occurs, there will be an additional burden on the district's surface transportation system in the Canyon Creek Road traffic impact fee zone.
Without funding-identified capital improvements, there will be an unacceptable level of traffic congestion, delays, accidents, and generally reduced public safety. Air quality could be adversely affected, as has been demonstrated in other studies when idle/standing times are increased.
Fund Balance June 30, 2021 $366,012.36
6507-75
2021-22 Deposits $0.00
2021-22 Interest $1,613.93
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $367,626.29
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Fund Balance June 30, 2021 $51,052.90
6514-95
2021-22 Deposits $0.00
2021-22 Interest $225.13
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $51,278.03
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 139 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Churn Creek Rd/Alrose Ln Intersection CC-33FFund
The fee is for iImprovements to the intersection that include adding an eastbound left turn lane and widening the eastbound approach to accommodate a through lane and a through right-turn lane.
Fund Balance June 30, 2021 $95,157.94
6515-10
2021-22 Deposits $0.00
2021-22 Interest $419.59
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $95,577.53
Current Fee: Fee determined by fair share
calculation.
The fund will be used for future improvements to the intersection when determined necessary.
Packet Pg. 140 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Churn Creek Rd/Hartmeyer Intersection. CC-33GFund
The fee is for mprovements to the intersection that include reconstructing the intersection to accommodate northbound lefts by providing a protected merge lane and a northbound right-turn lane.
Funds will be transferred to Shasta County for the construction of the improvements.
Fund Balance June 30, 2021 $252,897.18
6515-11
2021-22 Deposits $0.00
2021-22 Interest $1,115.16
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $254,012.34
Current Fee: Fee determined by fair share
calculation.
The fund will be used for future improvements to the intersection when determined necessary.
Packet Pg. 141 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Citywide Traffic Impact Fees 128-563Fund
The purpose of the Citywide Traffic Impact Fee, as set forth in Section 16.20.160 of the Redding Municipal Code, is to provide for the construction of street widening, traffic-control devices/facilities, transit facilities, bike paths, pedestrian facilities, bridge widening, and freeway interchange improvements related to new development in accordance with the development forecast under the City of Redding General Plan. As the amount of new development contemplated by the general plan occurs, there will be an additional burden on the citywide surface transportation system. Without funding identified capital improvements, there will be an unacceptable level of traffic congestion, delays, accidents, and generally reduced public safety throughout the city. Air quality could be adversely affected as has been demonstrated in other studies when idle/standing times are increased.
Fund Balance June 30, 2021 $14,290,246.16
6922-16
2021-22 Deposits $1,699,478.91
2021-22 Interest $7,499.97
2021-22 Expenditures ($3,723,353.87)
2021-22 Transfers Out $0.00
2021-22 Transfers In $9,487.48
Fund Balance June 30, 2022 $12,283,358.65
Current Fee: $6,485.00 per household equivalent
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
Transfer In due to additional grant funds received for the Old Oregon/Oasis project.
563-3999-1 Administration $60,907.59 $60,907.59 100% Ongoing 563-2278-1 Bank Service Fees $20,660.75 $20,660.75 100% Ongoing 563-4908-9 Canyon/Acid Bridge $60,929.36 $44,234.07 73% In Progress 563-6901-2 Debt Service $737,787.50 $737,787.50 100% In Progress 563-4908-6 Eastside/Canyon Bridge $90,466.31 $52,399.23 58% In Progress 563-4908-10 Eastside/Olney Bridge $78,314.95 $70,095.42 90% In Progress 563-2911-1 Fiscal/Paying Agent Fees $1,243.92 $1,243.92 100% Ongoing 563-4379-01 General Plan Update $137,270.81 $110,785.28 81% In Progress 563-4908-7 Girvan/Olney Bridge $86,962.15 $11,466.91 13% In Progress 563-4908-4 Old Atluras Bridge $214,945.10 $159,612.21 74% In Progress 563-4226-5 Project Coordination $24,927.14 $24,927.14 100% Ongoing 563-4908-8 Railroad(Westside)/Canyon Bridge $131,642.82 $109,463.80 83% In Progress 563-4226-13 S Bonny/I-5/Bechelli Roundabout $2,295,683.86 $2,295,683.86 100% In Progress 563-4908-11 Sharon/Acid Bridge $15,794.24 $15,794.24 100% In Progress 563-4226-10 Sunset Avenue Signal $8,291.95 $8,291.95 100% In Progress
Packet Pg. 142 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Dana Drive Impact Fee 128-564Fund
The purpose of the Dana Drive Impact Fee, as set forth in Section 16.20.170 of the Redding Municipal Code, is to provide for the construction of street widening, traffic signals, bridge widening, and freeway interchange improvements related to new development within the Dana Drive Traffic Impact Fee zone in accordance with the development forecast under the City of Redding General Plan. As the amount of new development contemplated by the General plan occurs, there will be an additional burden on the district's surface transportation system in the Dana Drive Impact Fee Zone. Without funding-identified capital improvements, there will be an unacceptable level of traffic congestion, delays, accidents, and generally reduced public safety. Air quality could be adversely affected, as has been demonstrated in other studies when idle/standing times are increased.
Fund Balance June 30, 2021 $522,257.85
6922-11
2021-22 Deposits $0.00
2021-22 Interest $1,460.14
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $523,717.99
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 143 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Hartnell Avenue at Lawrence Road HA/LRFund
The fee was a condition of development of Greenway Subdivision and is for a signal at the intersection of Lawrence Road and Hartnell Avenue.
Fund Balance June 30, 2021 $62,645.18
6514-60
2021-22 Deposits $0.00
2021-22 Interest $276.22
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $62,921.40
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 144 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) North Redding Traffic Benefit District 128-565Fund
The purpose of this fee, as set forth in Section 16.20.180 of the Redding Municipal Code, is to provide for the cost of the reconstruction and expansion of the interchange at Interstate 5 and Oasis Road and the realignment and widening of Oasis Road, Cascade Boulevard, and Twin View Boulevard and other associated projects as referenced in the North Redding Traffic Benefit District Traffic Impact Fee Study within the North Redding Traffic Benefit District traffic impact fee zone in accordance with the development forecast under the City of Redding General Plan. As the amount of new development contemplated by the General Plan occurs, there will be an additional burden on the district's surface transportation system in the North Redding Traffic Benefit District impact fee zone. Without funding identified capital improvements, there will be an unacceptable level of traffic congestion, delays, accidents, and generally reduced public safety. Air quality could be adversely affected, as has been demonstrated in other studies, when idle/standing times are increased.
Fund Balance June 30, 2021 $89,969.99
6922-41
2021-22 Deposits $56,457.00
2021-22 Interest $84.53
2021-22 Expenditures ($877.74)
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $145,633.78
Current Fee: $5,084.00 per household equivalent
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
565-3999-1 Bank Service Fees $877.74 $877.74 100% Ongoing
Packet Pg. 145 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Shasta View Drive Extension 104Fund
The fees were conditions of development of Gold Hills for improvements to Shasta View Drive within the subdivision and to connect Shasta View Drive to either Oasis Road or Collyer Drive.
Fund Balance June 30, 2021 $298,775.62
6507-22
2021-22 Deposits $0.00
2021-22 Interest $210.91
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $298,986.53
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 146 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Shasta View Drive/College View Drive Imp SVFund
The fee was a condition of development of UP-11-07 and is for improvements to the Shasta View Drive/College View Drive intersection.
Fund Balance June 30, 2021 $28,155.55
6515-06
2021-22 Deposits $0.00
2021-22 Interest $124.15
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $28,279.70
Current Fee: $0.00 This fee is no longer collected.
Funds are programmed for improvements to the Shasta View Drive/College View Drive intersection area.
Packet Pg. 147 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Traffic Signal - Airport Road and Meadowview Drive TS-EFund The fee was a condition of Use Permit UP-17-98 and is for a traffic signal at Airport Road and Meadowview Drive.
Fund Balance June 30, 2021 $5,900.00
6514-92
2021-22 Deposits $0.00
2021-22 Interest $26.01
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $5,926.01
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 148 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Traffic Signal - Lake Boulevard and Panorama Drive TS-AFund The fee was a condition of development of Hidden Haven Estates and is for a traffic signal at Lake Boulevard and Panorama Drive.
Fund Balance June 30, 2021 $4,718.92
6514-22
2021-22 Deposits $0.00
2021-22 Interest $20.81
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $4,739.73
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 149 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Traffic Signal - Lake Boulevard and Santa Rosa Way TS-DFund The fee was for a traffic signal at Lake Boulevard and Santa Rosa Way.
Fund Balance June 30, 2021 $9,585.65
6514-72
2021-22 Deposits $0.00
2021-22 Interest $42.27
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $9,627.92
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 150 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Traffic Signal - SR299/Churn Creek WB TS-FFund
The fee was for a traffic signal at the westbound intersection of SR299 and Churn Creek Road.
Fund Balance June 30, 2021 $64,548.52
6515-05
2021-22 Deposits $0.00
2021-22 Interest $284.62
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $64,833.14
Current Fee: $0.00 This fee is no longer collected.
Funds are programmed for the SR299 WB ramp.
Packet Pg. 151 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Traffic Signal - Victor Avenue and El Vista Street TS-BFund The fee was a condition of development of Victor Estates and is for a traffic signal at Victor Avenue and El Vista Street.
Fund Balance June 30, 2021 $72,629.35
6514-49
2021-22 Deposits $0.00
2021-22 Interest $320.25
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $72,949.60
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 152 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Park and Recreation Facilities Impact Fee 128-619Fund
The purpose of the Parks and Recreation Facilities Impact Fee, as set forth in Section 16.20.210 of the Redding Municipal Code, is to provide for the planning, acquisition, improvement, expansion, and financing of public parks, playgrounds, and recreational facilities. Increases in development and population result in an increased need for park and recreation facilities. If this need were not met, the wellbeing of city residents could be adversely affected. In order to address this potential and to meet City recreation standards, it is appropriate that new development pay for additional park and recreation facilities attributable to the impact of such development.
Fund Balance June 30, 2021 $2,078,889.83
6912-30
2021-22 Deposits $2,003,309.60
2021-22 Interest $3,926.66
2021-22 Expenditures ($516,009.90)
2021-22 Transfers Out ($150,780.00)
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $3,419,336.19
Current Fee: $5,663.00 per household equivalent
During Fiscal Years 2012-13, 2013-14, and 2014-15, Park and Recreation Impact Fees borrowed funds from Park In-Lieu Fees. The Transfer Out above is a loan payment to Park-In-Lieu Fees. Future Park and Recreation Impact Fees collected will be used to repay the remainder of the loan.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
619-2278-1 Bank Service Fees $9,240.95 $9,240.95 100% Ongoing 619-4796-57 Canyon Hollow Trail $13,150.49 $13,150.49 100% In Progress 619-5001-1 Enterprise Park Debt Service $34,251.40 $35,251.40 103% In Progress 619-4796-33 Magnolia Park $2,488.20 $2,488.20 100% In Progress 619-4623-3 Oregon Gulch O/S Signage $1,560.79 $1,560.79 100% In Progress 619-4716-1 Park Projects/Studies $23,312.60 $23,312.60 100% In Progress 619-4747-1 Rivercrest Park $6,181.60 $6,181.60 100% In Progress 619-4747-3 Salt Creek Heights Park $540,870.54 $424,823.87 79% In Progress
Packet Pg. 153 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Fire Facility Impact Fee 128-562Fund
The purpose of the Fire Facilities Impact Fee, as set forth in Section 16.20.150 of the Redding Municipal Code, is to fund facility and equipment needs, which are impacted by and required due to new development. There is a demand for new fire stations and equipment; replacement and updating of existing facilities and equipment; and construction of training facilities in response to development identified in the City of Redding General Plan. Evidence indicates that the demand is directly related to the impacts of new development and is necessary to maintain adequate levels of fire protection, suppression, rescue and emergency medical activities and the resources required for the successful mitigation of those incidents, while providing adequate response times and personnel to the areas served to maintain reasonable insurance rates for affected property owners.
Fund Balance June 30, 2021 $368,578.08
6917-46
2021-22 Deposits $401,718.55
2021-22 Interest $404.46
2021-22 Expenditures ($91,399.40)
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $679,301.69
Current Fee: $1,018.00 per household equivalent
The Fund balance will be used for future Fire Station #8 debt service payments.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
562-2278-1 Bank Service Fees $3,602.40 $3,602.40 100% Ongoing 562-5-5001-1 Debt Service - Fire Station 8 $87,797.00 $87,797.00 100% Ongoing
Packet Pg. 154 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Storm Drainage Impact Fees 147Fund
The purpose of the Storm Drainage Impact Fee, as set forth in Section 16.20.220 of the Redding Municipal Code, is to finance the cost of drainage and storm-water detention projects, including mains, tributary systems, creek improvements, and detention basins that are related to new development. New development increases the amount of impervious surfaces due to more roof area, paved streets, driveways, and parking lots. Flooding potential is thereby increased, particularly during periods of highintensity and/or sustained rainfall, creating an unacceptable hazard to citizen welfare and safety. The Storm Drainage Impact Fees will finance the improvements necessary to maintain adequate drainage, flood protection, and storm-water detention throughout the city in response to the impacts of new development.
Fund Balance June 30, 2021 $3,026,221.87
6912-29
2021-22 Deposits $0.00
2021-22 Interest $17,990.11
2021-22 Expenditures ($17,239.84)
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $3,026,972.14
Current Fee: $0.00 This fee is no longer collected.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
809-3999-1 Administration $6,079.84 $6,079.84 100% Ongoing 809-4226-5 Project Coordination $11,160.00 $11,160.00 100% Ongoing
Packet Pg. 155 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Wastewater System Impact Fees 145Fund
The purpose of the Wastewater System Impact Fee, as set forth in Section 16.20.200 of the Redding Municipal Code, is to further and protect the health and safety of the citizens of the city by providing for the construction of sewage and wastewater facilities, including new sewer drains, treatment plants, and aeration ponds. As new development occurs, there will be an additional burden placed on the existing sewer and wastewater collection, treatment, and disposal systems. Federal, State, and City health requirements set minimum standards for effluent treatment that results in the demand for new sewer and wastewater facilities.
Fund Balance June 30, 2021 $3,116,900.19
6941-25
2021-22 Deposits $1,053,707.32
2021-22 Interest $19,814.76
2021-22 Expenditures ($4,157,897.36)
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $32,524.91
Current Fee: $5,721.00 per household equivalent
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
878-3999-1 Administration $43,210.03 $21,605.02 50% Ongoing 878-4801-10 Biosolids Pyrolysis $1,937,877.75 $872,044.99 45% In Progress 877-4873-4 Block 7 Sewer Project $1,472,896.58 $530,242.77 36% In Progress 871-6934-1 Debt Service $6,724,492.07 $2,420,817.15 36% In Progress 878-3010-01 Food Waste/Bio gas $99,497.60 $49,748.80 50% In Progress 877-4088-1 Master Plan Update $123,201.32 $61,600.66 50% In Progress 878-4226-5 Project Coordination $68,993.05 $34,496.53 50% Ongoing 878-4801-7 UV Disenfection $5,357.87 $2,678.94 50% Ongoing 877-4086-2 Westside Interceptor III $164,662.51 $164,662.51 100% In Progress
Packet Pg. 156 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Upper and Middle Stillwater Sewer UMSFund
The fee is a condition of approval for Hacienda Heights, Tierra Oaks and Hope Lane subdivisions for the construction of Upper and Middle Stillwater Creek gravity sewer trunk lines.
Fund Balance June 30, 2021 $179,948.02
6507-84
2021-22 Deposits $3,824.44
2021-22 Interest $794.79
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $184,567.25
Current Fee: $2,207.56 per household equivalent
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 157 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Water System Impact Fees 143Fund
The purpose of the Water System Impact Fee, as set forth in Section 16.20.190 of the Redding Municipal Code, is to further and protect the health and safety of the citizens of the city of providing for facilities to ensure a continuing supply of potable water, including new water mains and storage reservoirs. Federal, State, and City regulations establish minimum standards for potable water required to adequately serve residential and other land uses, as well as to provide for fire protection. As the population increases and new development locates or existing development expands in the city, there will be an attendant demand to expand the facilities necessary to provide an adequate supply of potable water for domestic consumption; fire protection; and non-domestic purposes, such as industry and commerce.
Fund Balance June 30, 2021 $3,250,495.61
6931-21
2021-22 Deposits $913,210.00
2021-22 Interest $17,311.82
2021-22 Expenditures ($721,688.85)
2021-22 Transfers Out $0.00
2021-22 Transfers In $35,149.24
Fund Balance June 30, 2022 $3,494,477.82
Current Fee: $4,822.00 per household equivalent
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Reference # Project
Total
Expended
Expended
from Fund
% from
Fund
Project
Status
2020-21 Expenditure Detail
869-3999-1 Administration $26,995.38 $13,497.69 50% Ongoing 861-6785-1 Debt Service $731,057.93 $376,202.41 51% In Progress 869-4286-19 Lake Boulevard Water Main $108,384.29 $21,676.86 20% In Progress 869-4286-25 Masonic to Hilltop Water Main $21,077.57 $15,808.18 75% In Progress 869-4397-1 Master Plan Update $79,920.04 $39,960.02 50% In Progress 869-4226-5 Project Coordination $56,893.37 $28,446.69 50% Ongoing 869-4286-01 Shasta View Waterline Upsizing $226,097.00 $226,097.00 100% Complete
Packet Pg. 158 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update) Twin View Waterline TVWFund
The fee is a condition of development of Churn Creek Park Subdivision and is for improvements to the Twin View Waterline.
Fund Balance June 30, 2021 $2,692.90
6514-40
2021-22 Deposits $440.00
2021-22 Interest $13.65
2021-22 Expenditures $0.00
2021-22 Transfers Out $0.00
2021-22 Transfers In $0.00
Fund Balance June 30, 2022 $3,146.55
Current Fee: $40.00 per lot.
Refer to the 2021-22 to 2026-27 Capital Improvement Plan for project timing.
Packet Pg. 159 Attachment: Mitigation Fee Act Report FY 2021-22 (4.11(c)--Mitigation Fee Act Report Update)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to the Flood Damage Repair Project within City of Redding park and trail areas:
(1) Adopt the Mitigated Negative Declaration and the Mitigation Monitoring and Environmental Commitment Program; and
(2) Approve the Flood Damage Repair Project as described, thereby satisfying the requirements of the California Environmental Quality Act Guidelines §15074.
Fiscal Impact
Approval of the Flood Damage Repair Project (Project) along with adoption of the Mitigated Negative Declaration (MND) and the Mitigation Monitoring and Environmental Commitment Program (MMP) allows the project to move toward the final design and construction phases.
There is no fiscal impact as a direct result of adopting the MND and MMP and approving the project.
The City of Redding (City) has received funding assistance from the Federal Emergency Management Agency (FEMA) for public assistance project PA-09-CA-4301-PW-00936. FEMA has obligated approximately $589,052 for delivery of this project to date, but will provide funding for actual costs expended. Actual project costs are shared by FEMA (75%), State of California (State) (18.75%) and the City (6.25%), and expected to be approximately $785,403.
Alternative Action
The City Council (Council) may choose to not adopt the MND and the MMP, and not approve the project as described. This project would not be able to proceed without the approval of these documents, as it would not be in compliance with the California Environmental Quality Act (CEQA) guidelines.
MEETING DATE: December 20, 2022
ITEM NO. 4.11(d)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(d)--Approval of the Flood Damage Repair Project Chuck Aukland, Public
Works Director
Packet Pg. 160
Report to Redding City Council December 14, 2022
Re: 4.11(d)--Approval of the Flood Damage Repair Project Page 2 Background/Analysis
In January 2017, heavy rains and severe flooding caused water to overtop embankments along the Sacramento River, which damaged various parks and trails. The City sought funding assistance from FEMA and developed multiple projects to repair the storm damage.
The project consists of 12 work sites, located in four recreational areas: Turtle Bay East, Parkview Park, Blue Gravel Mine Trail, and Enterprise Park. The project will repair seating and viewing areas; as well as trail surfaces, trail embankments, and culverts. Work will include vegetation removal, demolition, excavation, grading, sediment removal, culvert cleaning, erosion repair, culvert installation, and placement of rock slope protection. Work will occur on City property or within easements. Construction is anticipated to take one season and will be completed in the fall of 2023. The project is needed so that pedestrians and bicyclists can continue to use the park and trail areas for recreation purposes.
An Initial Study (IS) was prepared to satisfy the requirements of the CEQA. It describes why the project is being proposed and the potential impacts to the existing environment. The IS shows that the proposed project could have a significant effect on biological resources, but with implementation of mitigation measures, those impacts will be reduced to a level considered less than significant. The mitigation measures and conservation measures to be implemented are common practices and include, but are not limited to, biological pre-construction surveys, inwater work windows, water quality monitoring, impact minimization, exclusionary fencing, and erosion control.
Based on the conclusions made in the IS, an MND was prepared. The MND describes the project, including mitigation measures, and makes the determination that there will be no significant effect on the environment provided that the defined mitigation measures are implemented as part of the project. In addition, an MMP has been written and incorporated into the MND (CEQA Section 21081.6). The MMP will be used by City staff, contractors, agencies, and monitoring personnel during and after the project to ensure effective implementation of the adopted mitigation measures outlined in the MND.
The IS/MND/MMP documents were sent to the State Clearinghouse for a 30-day public review period and distribution to pertinent state agencies. They were sent to local resource agencies, the Shasta County Clerk, and posted on the Public Works Department website. A public notice was also sent to landowners in the vicinity of the project and posted in the local newspaper. One comment letter was received during the public review period.
Environmental Review
The City of Redding is the lead agency for the project pursuant to CEQA. As the lead CEQA agency, the Council is authorized to adopt the MND per Redding Municipal Code Section §18.24.070.E and state law. Upon adoption of the MND and approval of the project by the Council, a Notice of Determination will be filed with the Shasta County Clerk’s Office and the State Clearinghouse, which will complete the environmental review process. The IS/MND is available in the Public Works Department and is currently available online at https://www.cityofredding.org/departments/public-works/environmental-management.
Packet Pg. 161
Report to Redding City Council December 14, 2022
Re: 4.11(d)--Approval of the Flood Damage Repair Project Page 3 On September 29, 2020, FEMA determined that the project activities are Categorically Excluded pursuant to Category Code N4 (Federal Assistance for Actions Involving Stream Work and Modification and Floodways) as it relates to the National Environmental Policy Act of 1969, as amended.
Council Priority/City Manager Goal
• This agenda item is a routine operational item.
Attachments
^Mitigated Negative Declaration
^Mitigation Monitoring and Environmental Commitment Program ^Location Map
FEMA NEPA Determination
Mitigated Negative Declaration
Packet Pg. 162
MITIGATED NEGATIVE DECLARATION
FLOOD DAMAGE REPAIR PROJECT
(STATE CLEARINGHOUSE NO. 2022100476)
SUBJECT
Flood Damage Repair Project
PROJECT DESCRIPTION
The City of Redding (City) is proposing the Flood Damage Repair Project in the City of Redding, Shasta County, California. In January 2017, heavy rains and severe flooding caused water to overtop embankments along the Sacramento River and local streams, damaging various parks and trails. The purpose of the project is to repair flood-damaged areas within City park and trail areas so that pre-flood design, function, and capacity (in-kind) is achieved. The project is needed so that pedestrians and bicyclists can continue to use the park and trail areas for recreation purposes. The project is led by the City and has received funding assistance from the Federal Emergency Management Agency (FEMA No.
PA-09-CA-4301-PW-00936) to complete the project.
The project consists of twelve work sites, located in four recreational areas: Turtle Bay East, Parkview Park, Blue Gravel Mine Trail, and Enterprise Park. The project will repair seating and viewing areas; as well as trail surfaces, trail embankments, and culverts. Work will include vegetation removal, demolition, excavation, grading, sediment removal, culvert cleaning, erosion repair, culvert installation, and placement of rock slope protection. Work will occur on City property or within easements. Construction is anticipated to take one season and will be completed in the fall of 2023.
ENVIRONMENTAL SETTING
The Turtle Bay East site is located in the Turtle Bay East Open Space Park, which is bisected by State Route 44 and parallel to Interstate 5. A small area near the project site is zoned Residential, and the remaining areas are designated as Open Space-Specific Plan and Public land use. This area includes a network of paved and unpaved trails that traverse riparian woodland habitats and grasslands.
The Parkview Park site is located at the Parkview Riverfront Park and is situated on the western bank of the Sacramento River. This area is designated as Open Space-Specific Plan land use. Land use surrounding the park is primarily commercial and residential development.
The Blue Gravel Mine Trail is located near the intersection of Placer Street and Buenaventura Boulevard.
Land use in the project vicinity includes Open Space, Residential, Commercial, Public, and transportation corridors. The project area includes paved trail area that traverses through a narrow, undeveloped canyon formed by the Blue Gravel Creek.
The Enterprise Park sites are located on the west side of Enterprise Community Park, near the community garden. Surrounding land use includes residential housing and open fields to the south.
Flood Damage Repair Project Page 1
December 2022
Packet Pg. 163 Attachment: ^Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project)
City of Redding
Public Works Department, Engineering Division Mitigated Negative Declaration
FINDINGS AND DETERMINATION
The City of Redding conducted an Initial Study (attached) that determined that the proposed project could have significant environmental effects on biological resources. Implementation of specific mitigation measures identified below will avoid or mitigate the potentially significant environmental effects identified, and the preparation of an environmental impact report will not be required. If there are substantial changes that alter the character or impacts of the proposed project, another environmental impact determination will be necessary.
Prior to approval of the project, the lead agency may conclude, at a public hearing, that certain mitigation measures identified in the Mitigated Negative Declaration are infeasible or undesirable. In accordance with California Environmental Quality Act (CEQA) Section 15074.1, the lead agency may delete those mitigation measures and substitute other measures that it determines are equivalent or more effective. The lead agency would adopt written findings that the new measure(s) is(are) equivalent or more effective in mitigating or avoiding potential significant effects and that it would not cause any potentially significant effect on the environment.
1) Based on the whole record (including the Initial Study and any supporting documentation) and the mitigation measures incorporated into the project, the City of Redding has determined that there is no substantial evidence that the project will have a significant effect on the environment. 2) The Mitigated Negative Declaration, with its supporting documentation, reflects the independent judgment and analysis of the lead agency, which is the City of Redding.
DOCUMENTATION
The attached Initial Study documents the reasons to support the above determination.
MITIGATION MEASURES
The following mitigation measures will be incorporated into the project to minimize potential effects on biological resources:
MM-1. All areas to be avoided during construction will be fenced and/or flagged as close to construction limits as possible.
MM-2. Worker Environmental Awareness Training will be conducted by a qualified biologist before the start of work to educate crews regarding the location of the elderberry shrubs, life history and listing status of VELB, and the measures necessary to avoid impacts onto the shrub and VELB habitat (USFWS 2017).
MM-3. A qualified biologist will monitor the work area at project-appropriate intervals to assure that all avoidance and minimization measures are implemented.
MM-4. Activities that involve work within the stream channel and activities within 165 feet of the elderberry shrub will be conducted during the lowest flow period and outside of the flight season of VELB. The work period for the Parkview Park is July 1 to October 31.
December 2022
Packet Pg. 164 Attachment: ^Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project)
City of Redding
Mitigated Negative Declaration Public Works Department, Engineering Division MM-5. All construction personnel will be required to attend an environmental awareness training prior to the start of construction. The training will be conducted by a qualified biologist and will familiarize construction personnel with the special status species that may occur onsite, their habitats, provisions and protections, measures to be implemented, and the project boundaries. The training must be provided within 3 days of the arrival of any new worker.
MM-6. Prior to the onset of construction activities, a qualified biologist will conduct preconstruction surveys for western pond turtle, turtle nests, and foothill yellow-legged frog. If these species or turtle nests are observed during the preconstruction survey or during construction, CDFW will be contacted, and work within that area will be avoided until an appropriate course of action is established. If western pond turtle, turtle nests, or foothill yellow-legged frog are not observed during the preconstruction survey, then construction activities may begin. If construction is delayed or halted for more than 7 days, another preconstruction survey will be conducted.
MM-7. If vegetation removal or construction activities will occur during the nesting season for birds or raptors (February 1 through August 31 for birds and November 1 through July 1 for raptors), a qualified biologist will conduct a preconstruction survey seven (7) days before construction activities begin. If nesting birds or raptors are found, CDFW will be notified and consulted. An appropriate buffer, as determined by CDFW and the qualified biologist, will be placed around the nest until the young have fledged. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
MM-8. If an active raptor nest is found, no construction activities will occur within 300-feet of the nest for raptors and 450-feet of the nest for special-status raptors unless a smaller buffer zone is approved by the CDFW. Construction may resume once the young have left the nest or as approved by a qualified biologist.
MM-9. If it is determined that tree removal is required, the removal of trees 10 inches DBH or greater with cavities, crevices, or snags shall occur before bat maternity colonies form (i.e., prior to March 1) or after young are volant (i.e., after August 31), to the extent practical. If construction (including the removal of large trees) occurs during the bat non-volant season (March 1 through August 31), a qualified biologist shall conduct a pre-construction survey of the study area to locate maternity colonies. The preconstruction survey will be performed no more than 7 days prior to the implementation of construction activities. If a maternity colony is located within or adjacent to the study area, a disturbance free buffer shall be established by a qualified biologist, in consultation with CDFW, to ensure the colony is protected from project activities. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
PUBLIC REVIEW DISTRIBUTION
Draft copies or notice of this Mitigated Negative Declaration were distributed to:
State Clearinghouse
Shasta County Clerk
California Department of Transportation District 2
California Department of Fish and Wildlife District 1 Central Valley Regional Water Quality Control Board –Region 5 (Redding) California Highway Patrol
Flood Damage Repair Project Page 3
December 2022
Packet Pg. 165 Attachment: ^Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City ofRedding
Public Works Department, Engineering Division Mitigated Negative Declaration • Native American Heritage Commission
• State Office of Historic Preservation
• All property owners within 300 feet of the property boundary
PUBLIC REVIEW
(X ) Draft document referred for comments 10/2112022 - 11/21/2022
Date
( ) No comments were received during the public review period. ( ) Comments were received but did not address the draft Mitigated Negative Declaration findings or the accuracy/completeness ofthe Initial Study. No response is necessary. The letters are attached. (X) Comments addressing the findings ofthe draft Mitigated Negative Declaration and/or accuracy or completeness of the Initial Study were received during the public review period. The letters and responses follow (see Attachment D, Response to Comments).
Copies of the Mitigated Negative Declaration, the Initial Study, documentation materials, and the Mitigation Monitoring Program may be obtained at the Public Works Department, Engineering Division, City of Redding, 777 Cypress Avenue, Redding, CA 96001. Contact: Amber Kelley, Environmental Compliance Manager, (530) 225-4046 or [email protected].
Date of
Draft Report: October 20, 2022 By: ~~~~-'-~~~
Name/ Title: Amber Kelley
Environmental Complia
Date of
Final Report: December 1, 2022
Attachments:
A. Vicinity Map
B. Initial Study
C. Mitigation Monitoring and Environmental Commitment Program D. Comments and Response to Comments (if any)
December 2022
Packet Pg. 166 Attachment: ^Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) Flood Damage Repair Project Page 1
October 2022
MITIGATION MONITORING AND
ENVIRONMENTAL COMMITMENT PROGRAM
FLOOD DAMAGE REPAIR PROJECT
FEMA-PA-09-CA-4301-PW-00936
(STATE CLEARINGHOUSE NO. 2022100476)
MITIGATION MONITORING PROGRAM CONTENTS
This document is the Mitigation Monitoring and Environmental Commitment Program (MMP/ECP) for the Flood Damage Repair Project (project). The MMP/ECP includes a brief discussion of the legal basis for, and the purpose of, the program, discussion, and direction regarding complaints about noncompliance; a key to understanding the monitoring matrix; and the monitoring matrix.
LEGAL BASIS OF AND PURPOSE FOR THE MITIGATION MONITORING PROGRAM California Public Resources Code Section 21081.6 requires public agencies to adopt mitigation monitoring or reporting programs whenever certifying an environmental impact report (EIR) or a mitigated negative declaration (MND). This requirement facilitates implementation of all mitigation measures adopted through the California Environmental Quality Act (CEQA) process.
The MMP contained herein is intended to satisfy the requirements of CEQA as they relate to the Initial Study/Mitigated Negative Declaration prepared for the project. It is intended to be used by City of Redding (City) staff, participating agencies, project contractors, and mitigation monitoring personnel during implementation of the project.
Mitigation is defined by CEQA Guidelines Section 15370 as a measure that does any of the following:
Avoids impacts altogether by not taking a certain action or parts of an action. Minimizes impacts by limiting the degree or magnitude of the action and its implementation. Rectifies impacts by repairing, rehabilitating, or restoring the impacted environment. Reduces or eliminates impacts over time by preservation and maintenance operations during the life of the project.
Compensates for impacts by replacing or providing substitute resources or environments.
The intent of the MMP is to ensure the effective implementation and enforcement of adopted mitigation measures and permit conditions. The MMP will provide for monitoring of construction activities as necessary, onsite identification and resolution of environmental problems, and proper reporting to City staff.
In addition to meeting the CEQA MMP requirements, this document incorporates environmental commitments, standard practices, conservation measures, and best management practices (BMPs).
The environmental commitments may be part of the project design, standard contract specifications, City requirements, or conservation measures. These commitments are part of the project, but they do not Packet Pg. 167 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Mitigation Monitoring Program
October 2022
constitute mitigation under CEQA as they have not been incorporated to reduce a potentially significant impact.
MITIGATION MONITORING/ENVIRONMENTAL COMMITMENT PROGRAM TABLE The MMP/ECP Table identifies the mitigation measures and commitments proposed for the project.
The tables have the following columns:
Mitigation Measure: Lists the mitigation measures identified within the Initial Study for a specific potentially significant impact, along with the number for each measure as enumerated in the Initial Study.
Environmental Commitment: Lists the commitments identified within the project that are not related to a potentially significant CEQA impact, but further ensure environmental resource protection.
Timing: Identifies at what point in time, review process, or phase the mitigation measure will be completed.
Agency/Department Consultation: References the City department or any other public agency with which coordination is required to satisfy the identified mitigation measure. Verification: Spaces to be initialed and dated by the individual designated to verify adherence to a specific mitigation measure.
NONCOMPLIANCE COMPLAINTS
Any person or agency may file a complaint asserting noncompliance with the mitigation measures and commitments associated with the project. The complaint shall be directed to the City in written form, providing specific information on the asserted violation. The City shall investigate and determine the validity of the complaint. If noncompliance with a mitigation measure has occurred, the City shall take appropriate action to remedy any violation. The compliant shall receive written confirmation indicating the results of the investigation or the final action corresponding to the particular noncompliance issue.
Packet Pg. 168 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Mitigation Monitoring Program Flood Damage Repair Project Page 3
October 2022
MITIGATION MONITORING AND ENVIRONMENTAL COMMITMENT PROGRAM TABLE
FOR THE FLOOD DAMAGE REPAIR PROJECT
MITIGATION MONITORING PROGRAM
(STATE CLEARINGHOUSE NO. 2022100476)
ENVIRONMENTAL COMMITMENTS
The following environmental commitments will be incorporated into the project to further protect environmental and biological resources:
Best Management Practices
Timing/
Implementation
Enforcement/
Monitoring
Verification
(Date and Initials)
Air Quality (AQ)
AQ-1. Nontoxic soil stabilizers will be applied according to manufacturer’s specification to all inactive construction areas.
Construction Construction
Management
AQ-2. All grading operations will be suspended when winds (as instantaneous gusts) exceed 20 miles per hour.
Construction Construction
Management
AQ-3. Water all stockpiles, access roads, and disturbed or exposed areas, as necessary, to prevent airborne dust.
Construction Construction
Management
AQ-4. Pursuant to the California Vehicle Code (Section 23114(e)(4)) (California Legislative Information 2016), all trucks hauling soil and other loose material to and from the construction site will be covered or will maintain at least 6 inches of freeboard (i.e., minimum vertical distance between top of load and the trailer).
Construction Construction
Management
AQ-5. All public roadways used by the project contractor will be maintained free from dust, dirt, and debris caused by construction activities. Streets will be swept at the end of the day if visible soil materials are carried onto adjacent public paved roads.
Construction Construction
Management
Biological Resources (BIO)
BIO-1. As required by the City of Redding Stormwater Quality Management and Discharge Control Ordinance, an erosion and sediment control plan (ESCP) or will be prepared to address BMPs that will be used to prevent erosion and sediment loss. The ESCP must also address dust control, spill control, pollution control, waste management, equipment maintenance and fueling, and materials storage within the project site.
Preconstruction/
Construction
City/
Construction
Management
Packet Pg. 169 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the City of Redding
Public Works Department, Engineering Division Mitigation Monitoring Program Flood Damage Repair Project Page 4
October 2022
Best Management Practices
Timing/
Implementation
Enforcement/
Monitoring
Verification
(Date and Initials)
BIO-2. Appropriate erosion and sediment control measures (e.g., silt fences, straw wattles) shall be in place prior to the onset of construction activities near jurisdictional waters and in project areas where there is a potential for surface runoff to drain into jurisdictional waters. The measures shall be monitored and maintained until construction activities have ceased.
Preconstruction/
Construction
City/
Construction
Management
BIO-3. High visibility fencing, flagging, or markers will be installed along the edges of the work zone near avoided waters and riparian areas. In addition, equipment entry and exit points; and staging, storage, and stockpile areas must be clearly marked prior to the entry of mechanized equipment or vehicles into the construction area.
Preconstruction/
Construction
City/
Construction
Management
BIO-4. The contractor will install the necessary containment structures to control the placement of wet concrete and to prevent it from entering into the channel outside of those structures.
Preconstruction/
Construction
City/
Construction
Management
BIO-5. When the contractor is pouring or working with wet concrete there will be a designated monitor to inspect the containment structures and ensure that no concrete or other debris enters into the channel outside of those structures.
Preconstruction/
Construction
City/
Construction
Management
BIO-6. No concrete shall be poured within the ordinary high-water mark (OHWM) if the 15-day weather forecast indicates any chance of rain greater than 30 percent.
Preconstruction/
Construction
City/
Construction
Management
BIO-7. Concrete washout will occur in a designated and appropriately prepared area setback at least 100 feet from the riparian area.
Preconstruction/
Construction
City/
Construction
Management
BIO-8. Poured concrete will be excluded from the wetted channel for a period of 30 days after it is poured. Commercial sealants may be applied to the poured concrete surface where difficulty in excluding water flow for a long period may occur. If sealant is used, water shall be excluded from the site until the sealant is dry.
Preconstruction/
Construction
City/
Construction
Management
Cultural Resources (CR)
CR-1. If previously unidentified cultural materials are unearthed during construction, it is City policy that work be halted in that area until a qualified archaeologist can assess the significance of the find.
Construction City/
Construction
Management
Packet Pg. 170 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the City of Redding
Public Works Department, Engineering Division Mitigation Monitoring Program Flood Damage Repair Project Page 5
October 2022
Best Management Practices
Timing/
Implementation
Enforcement/
Monitoring
Verification
(Date and Initials)
CR-2. If human remains are discovered during project activities, all activities near the find will be stopped, and the Shasta County Sheriff-Coroner’s Office will be notified. If the coroner determines that the remains may be those of a Native American, the coroner will contact the Native American Heritage Commission (NAHC). Treatment of the remains will be conducted in accordance with further direction of the County Coroner or NAHC, as appropriate.
Construction City/NAHC/
County Coroner
Hazards and Hazardous Materials (HAZ)
HAZ-1. Hazardous materials, including fuels, oils, cement, and solvents will be stored and contained in an area protected from direct runoff and away from areas where they could enter waters of the United States.
Construction City/
Construction
Management
HAZ-2. Construction equipment will be inspected daily for leaks. Leaking fluids will be contained upon detection, and equipment repairs will be made as soon as practicable, or the leaking equipment will be moved offsite.
Construction City/
Construction
Management
HAZ-3. Secondary containment such as drip pans or absorbent materials will be used to catch spills or leaks when removing or changing fluids. Secondary containment will be used for storage of all hazardous materials.
Construction City/
Construction
Management
HAZ-4. Spill containment and clean-up materials will be kept onsite at all times for use in the event of an accidental spill.
Construction City/
Construction
Management
HAZ-5. Absorbent materials will be used on small spills rather than hosing down or burying the spill. The absorbent material will be promptly removed and disposed of properly.
Construction City/
Construction
Management
Hydrology and Water Quality (WQ)
WQ-1. All construction work and stockpiling of materials will be confined to the project disturbance area.
Construction City/
Construction
Management
WQ-2. Temporary stockpiling of excavated or imported material will be placed in upland areas. Construction City/ Construction
Management
WQ-3. Excess soil will be used onsite or disposed of at a regional landfill or other appropriate facility.
Construction City/
Construction
Management
Packet Pg. 171 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the City of Redding
Public Works Department, Engineering Division Mitigation Monitoring Program Flood Damage Repair Project Page 6
October 2022
CALIFORNIA ENVIRONMENTAL QUALITY ACT MITIGATION MEASURES Resource-specific mitigation measures that will be used during project implementation include the following:
Mitigation Measure (MM)
Timing/
Implementation
Enforcement/
Monitoring
Verification
(Date and Initials)
Biological Resources (BIO)
MM-1. All areas to be avoided during construction will be fenced and/or flagged as close to construction limits as possible.
Preconstruction/
Construction
City/
Construction
Management
MM-2. Worker Environmental Awareness Training will be conducted by a qualified biologist before the start of work to educate crews regarding the location of the elderberry shrubs, life history and listing status of VELB, and the measures necessary to avoid impacts on the shrub and VELB habitat (USFWS 2017).
Preconstruction/
Construction
City/
Construction
Management
MM-3. A qualified biologist will monitor the work area at project-appropriate intervals to assure that all avoidance and minimization measures are implemented.
Preconstruction/
Construction
City/
Construction
Management
MM-4. Activities that involve work within the stream channel and activities within 165 feet of the elderberry shrub will be conducted during the lowest flow period and outside of the flight season of VELB. The work period for the Parkview Park is July 1 to October 31.
Construction City/
Construction
Management
MM-5. All construction personnel will be required to attend an environmental awareness training prior to the start of construction. The training will be conducted by a qualified biologist and will familiarize construction personnel with the special status species that may occur onsite, their habitats, provisions and protections, measures to be implemented, and the project boundaries. The training must be provided within 3 days of the arrival of any new worker.
Preconstruction/
Construction
City/
Construction
Management
MM-6. Prior to the onset of construction activities, a qualified biologist will conduct preconstruction surveys for western pond turtle, turtle nests, and foothill yellow-legged frog. If these species or turtle nests are observed during the preconstruction survey or during construction, CDFW will be contacted, and work within that area will be avoided until an appropriate course of action is established. If western pond turtle, turtle nests, or foothill yellow-legged frog are not observed during the preconstruction survey, then construction activities may begin. If construction is delayed or halted for more than 7 days, another preconstruction survey will be conducted.
Construction City/
Construction
Management
Packet Pg. 172 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the City of Redding
Public Works Department, Engineering Division Mitigation Monitoring Program Flood Damage Repair Project Page 7
October 2022
Mitigation Measure (MM)
Timing/
Implementation
Enforcement/
Monitoring
Verification
(Date and Initials)
MM-7. If vegetation removal or construction activities will occur during the nesting season for birds or raptors (February 1 through August 31 for birds and November 1 through July 1 for raptors), a qualified biologist will conduct a preconstruction survey seven (7) days before construction activities begin. If nesting birds or raptors are found, CDFW will be notified and consulted. An appropriate buffer, as determined by CDFW and the qualified biologist, will be placed around the nest until the young have fledged. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
Construction City/
Construction
Management
MM-8. If an active raptor nest is found, no construction activities will occur within 300-feet of the nest for raptors and 450-feet of the nest for special-status raptors unless a smaller buffer zone is approved by the CDFW. Construction may resume once the young have left the nest or as approved by a qualified biologist.
Construction City/
Construction
Management
MM-9. If it is determined that tree removal is required, the removal of trees 10 inches DBH or greater with cavities, crevices, or snags shall occur before bat maternity colonies form (i.e., prior to March 1) or after young are volant (i.e., after August 31), to the extent practical. If construction (including the removal of large trees) occurs during the bat non-volant season (March 1 through August 31), a qualified biologist shall conduct a pre-construction survey of the study area to locate maternity colonies. The preconstruction survey will be performed no more than 7 days prior to the implementation of construction activities. If a maternity colony is located within or adjacent to the study area, a disturbance free buffer shall be established by a qualified biologist, in consultation with CDFW, to ensure the colony is protected from project activities. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
Construction City/
Construction
Management
Packet Pg. 173 Attachment: ^Mitigation Monitoring and Environmental Commitment Program (4.11(d)--Approval of the Packet Pg. 174 Attachment: ^Location Map (4.11(d)--Approval of the Flood Damage Repair Project)
6)' *)()6%0)1)6+)2'=1%2%+)1)28%+)2'=
6)'36(3*)2:-6321)28%0'327-()6%8-32
6)'
4VSNIGX
8MXPI
4%
'%4;
7,'6+'MX]SJ6IHHMRK4EVOW
8VEMPW
2SR'SQTPMERX*PEK
0IZIP
)%(VEJX(EXI
)%*MREP(EXI
)%4YFPMG2SXMGI(EXI
)%*SRWM
)-72SXMGISJ-RXIRX )-763((EXI
2S
'%8)<
'SQQIRX '%8+ GSQTPIXI'MX]SJ6IHHMRK7LEWXE'SYRX]'% 'MX]SJ6IHHMRK4EVOW
8VEMPW
9XMPM^IGSRXVEGXWIVZMGIWXSVITEMVPSGEXMSRWEX0347MXIW %&'(),ERH-
[MPPVIQSZI
'=SJZIKIXEXMZIHIFVMWERHWSMPJVSQGPSKKIHGYPZIVXVITPEGIETTVS\MQEXIP] SJHIGSQTSWIH
KVERMXIEX
VMZIVIQFEROQIRXKVERMXIXVEMPERHEVSYRHTEVOXEFPI
VIQSZIERHVITPEGIWXIIPJIRGIERH
TSPIW8LIJSPPS[MRKPSGEXMSRW034
7MXIW'ERH(
ERH034
7MXIW
[MPPYXMPM^IJSVGI
EGGSYRXQEXIVMEPW
EX034
7MXI'
TPEGISJYRGPEWWMJMIHJMPPXSVITEMVIQFEROQIRX034 7MXI
(
VIQSZI'=HIFVMWJVSQEGYPZIVXERH034
7MXI
VITPEGI'=SJGSRGVIXIXVEMPWYVJEGIERH
EX034
WMXI
034
7MXI
VITPEGI
'=SJ73(JIRGIERHTSPIWERHEHH034
7MXI
TPEGI
'=SJYRGPEWWMJMIHJMPPXSIQFEROQIRXWERHPERHEVIEW 8LIJSPPS[MRKLE^EVHQMXMKEXMSRTVSTSWEPMWMRGPYHIHMWJSV7MXI034 7MXI%ERH&
TPEGI
'=SJ
VMTVET034
7MXI&
TPEGI'=SJWPYVV]VMTVETSZIVXLIVSGOWPSTITVSXIGXMSRWERHEX034
7MXI'
'=SJ 82SJVMTVETEXXLIIRHWIGXMSRSJGYPZIVX034 7MXI%%
[MPPTPEGI'=SJ
WPYVV]VMTVET034
7MXI&&
TPEGI
'=SJTVSTSWIH 82VMTVET034
7MXI&
EVXMGYPEXIH
FPSGOW[MXLKISXIGLJEFVMG034
7MXI'
0*I\XIRWMSRXSFSXLGYPZIVXWERHEHH
'=SJVMTVET
[MXLKISXI\XMPIJEFVMG034
7MXI(
EVXMGYPEXIHFPSGOW[MXLKISXIGLJEFVMGEWEGEXGLFEWMRERH 034
7MXI
TPEGI
'=SJ 82SJVMTVET
8LMWTVSNIGXLEWFIIRHIXIVQMRIHXSFI'EXIKSVMGEPP])\GPYHIHJVSQXLIRIIHXSTVITEVIIMXLIVER )RZMVSRQIRXEP-QTEGX7XEXIQIRXSV)RZMVSRQIRXEP%WWIWWQIRXMREGGSVHERGI[MXL*)1%-RWXVYGXMSR
ERH(,7-RWXVYGXMSR
'EXIKSVMGEP)\GPYWMSR
W
2LEWFIIRETTPMIH4EVXMGYPEV
EXXIRXMSRWLSYPHFIKMZIRXSXLITVSNIGXGSRHMXMSRWFIJSVIERHHYVMRKTVSNIGXMQTPIQIRXEXMSR*EMPYVIXS GSQTP][MXLXLIWIGSRHMXMSRWQE]NISTEVHM^IJIHIVEPEWWMWXERGIMRGPYHMRKJYRHMRK XRI[WSR
+18
2)4%()8)61-2%8-32
'EXI\'EXIKSV]'SHI (IWGVMTXMSR 7IPIGXIH
R
*IHIVEP%WWMWXERGIJSV%GXMSRW-RZSPZMRK7XVIEQ;SVOERH1SHMJMGEXMSR ERH*PSSH[E]W*IHIVEPEWWMWXERGIJSVVITEMVERHVIWXSVEXMSREGXMSRWLE^EVH QMXMKEXMSREGXMSRWSXLIVXLERJPSSHGSRXVSPSVXLIRI[GSRWXVYGXMSRSJJEGMPMXMIW XLEXEVIJYRGXMSREPP]HITIRHIRXSVJEGMPMXEXISTIRWTEGIYWI[LIRXLIEGXMSRW EVI[MXLMRSVEJJIGXVIKYPEXSV]JPSSH[E]WWXVIEQWERHWXVIEQFEROWERHXLEX
E
-RZSPZIKVSYRHHMWXYVFERGISJPIWWXLER¡EGVI
F
-RZSPZIWXVIEQFERO
[SVOSVEPXIVEXMSRSJPIWWXLERPMRIEVJIIX
G
(SRSXMRZSPZILEVHIRMRKSV
EVQSVMRKSJXLIWXVIEQFEROWYRPIWWXLITVSNIGXYWIWWXVIEQSVWXVIEQFERO FMSIRKMRIIVMRKXIGLRMUYIWERHMQTVSZIJMWLTEWWEKISVLEFMXEX H
(SRSXVIWYPX
MREHZIVWIJPSSHVMWOIJJIGXWXSHS[RWXVIEQGSQQYRMXMIW I
(SRSXVIWYPXMRER]
MRGVIEWISJJPSSHPIZIPW[MXLMRXLIGSQQYRMX]HYVMRKXLISGGYVVIRGISJXLIFEWI JPSSHHMWGLEVKIMJXLIEGXMSRXEOIWTPEGI[MXLMRXLIVIKYPEXSV]JPSSH[E]ERH J
;LIVIXLIIJJIGXSJXLITVSTSWIHTVSNIGX[LIRGSQFMRIH[MXLSXLIVI\MWXMRKSV VIEWSREFP]JSVIWIIEFPIHIZIPSTQIRX[MPPRSXMRGVIEWI[EXIVWYVJEGIIPIZEXMSRSJ XLIFEWIJPSSHQSVIXLERSRIJSSXEXER]TSMRX[MXLMRXLIGSQQYRMX]MJXLIEGXMSR XEOIWTPEGIMREJPSSHTPEMR[MXLRSVIKYPEXSV]JPSSH[E] R =IW
'%8)<'%8)+36-)7
)<86%36(-2%6=
238)
%PPXMQIWEVI+18YWMRKELSYVGPSGO 4EKISJ Packet Pg. 175 Attachment: FEMA NEPA Determination (4.11(d)--Approval of the Flood Damage Repair Project)
6)' *)()6%0)1)6+)2'=1%2%+)1)28%+)2'=
6)'36(3*)2:-6321)28%0'327-()6%8-32
6)'
4VSNIGX
8MXPI
4%
'%4;
7,'6+'MX]SJ6IHHMRK4EVOW
8VEMPW
)\XVESVHMREV]'MVGYQWXERGI'SHI (IWGVMTXMSR 7IPIGXIH#
2S)\XVESVHMREV]'MVGYQWXERGIW[IVIWIPIGXIH
)RZMVSRQIRXEP0E[
)\IGYXMZI3VHIV 7XEXYW (IWGVMTXMSR 'SQQIRX
'PIER%MV%GX
'%%
4VSNIGXMWPSGEXIHMREREXXEMRQIRXEVIE
6IZMI[GSRGPYHIH
8LITVSNIGXMWPSGEXIHMR7LEWXE'SYRX]XLEXMW
[MXLMREREXXEMRQIRXEVIEJSVEPPGVMXIVMETSPPYXERXW
EGGSVHMRKXSXLI97)RZMVSRQIRXEP4VSXIGXMSR
%KIRG]
97)4%
LXXTW
[[[ITEKSZKVIIR
FSSOYTHEXIH1EVGL
8LI73;
EWWSGMEXIH[MXLXLMWYRHIVXEOMRKMWI\IQTXJVSQ
EGSRJSVQMX]HIXIVQMREXMSRYRHIVXLI+IRIVEP
'SRJSVQMX]6YPIXRI[WSR
+18
'SQTPIXIH
'SEWXEP&EVVMIV6IWSYVGIW%GX
'&6%
4VSNIGXMWRSXSRSVGSRRIGXIHXS'&6%9RMX
SVSXLIV[MWITVSXIGXIHEVIE6IZMI[
GSRGPYHIH
'SQTPIXIH
'PIER;EXIV%GX
';%
4VSNIGX[SYPHEJJIGX[EXIVWMRGPYHMRK
[IXPERHWSJXLI97
8LIWGSTISJ[SVOEWWSGMEXIH[MXLXLMW
9RHIVXEOMRKLEWXLITSXIRXMEPXSEJJIGX[EXIVWSJ
XLI97%-REGGSVHERGI[MXLE1IQSVERHYQSJ
9RHIVWXERHMRKWMKRIH*IFXL*)1%
ERHXLI97%VQ]'SVTWSJ)RKMRIIVW
97%')
IWXEFPMWLIHXLEX*)1%[MPPFIXLI0IEH*IHIVEP
%KIRG]JSV'PIER;EXIV%GX
';%
GSQTPMERGI
EWHIWGVMFIHMRXLIEXXEGLIHHSGYQIRXEXMSR7II
EXXEGLQIRXERH'SRHMXMSRXRI[WSR
+18
'SQTPIXIH
4VSNIGXQE]VIUYMVI7IGXMSRSV
7IGXMSR
6MZIVWERH,EVFSVW%GX
TIVQMXMRGPYHMRKUYEPMJMGEXMSRYRHIV
2EXMSR[MHI4IVQMXW6IZMI[GSRGPYHIH
'SQTPIXIH
'SEWXEP>SRI1EREKIQIRX%GX
'>1%
4VSNIGXMWRSXPSGEXIHMREGSEWXEP^SRIEVIE
ERHHSIWRSXEJJIGXEGSEWXEP^SRIEVIE
6IZMI[GSRGPYHIH
'SQTPIXIH
)\IGYXMZI3VHIV
*PSSHTPEMRW
0SGEXIHMRJPSSHTPEMRSVIJJIGXWSR
JPSSHTPEMRJPSSHPIZIPW
>32)<
0347MXIW
%)-,
ERH034
7MXIW
%&'(
4)6*PSSH-RWYVERGI6EXI
1ET
'
4ERIP
+
7MXIW
034
7MXIW%)-,
ERH4ERIP
+
7MXIW
034
7MXIW%&'(
HEXIH
1EVGL
EVI
PSGEXIHSYXWMHIXLI7TIGMEP*PSSH%VIE
]IEV
JPSSHTPEMRFEWIJPSSHTPEMR
ERHXLIEGXMZMX]HSIW
RSXEHZIVWIP]EJJIGXXLIJPSSHTPEMR
ZEPYIWCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
CCCC
>32)%ERH%)
0347MXIW
&'(
0347MXIW
%%%)''
ERH0347MXIW
4)6*PSSH-RWYVERGI6EXI1ET
'
4ERIP
+
7MXIW
0347MXIW&'(
4ERIP
+
7MXIW
0347MXIW%%
'SQTPIXIH
)2:-6321)28%00%;)<)'98-:)36()6
238)
%PPXMQIWEVI+18YWMRKELSYVGPSGO 4EKISJ Packet Pg. 176 Attachment: FEMA NEPA Determination (4.11(d)--Approval of the Flood Damage Repair Project)
6)' *)()6%0)1)6+)2'=1%2%+)1)28%+)2'=
6)'36(3*)2:-6321)28%0'327-()6%8-32
6)'
4VSNIGX
8MXPI
4%
'%4;
7,'6+'MX]SJ6IHHMRK4EVOW
8VEMPW
)RZMVSRQIRXEP0E[
)\IGYXMZI3VHIV 7XEXYW (IWGVMTXMSR 'SQQIRX
&&''
4ERIP
+
7MXI
0347MXIW
%2(4ERIP
+
7MXIW
0347MXIWERH
HEXIH1EVGL8LITVSNIGXWEVI
PSGEXIH[MXLMRER%^SRIE7TIGMEP*PSSH
,E^EVH%VIE
]IEVJPSSHTPEMRFEWI
JPSSHTPEMR
8LITVSTSWIHEGXMSRMWRSXPMOIP]XS
VIWYPXMRER]TSXIRXMEPHMVIGXMQTEGXWXLEX[SYPH
EHZIVWIP]EJJIGXXLIREXYVEPZEPYIWERHJYRGXMSR
SJJPSSHTPEMRW-RMXMEP(MWEWXIV4YFPMG2SXMGI[EW
TYFPMWLIHSR1EVGL7II'SRHMXMSR
RQSVEPI
+18
4SWWMFPIEHZIVWIIJJIGXWEWWSGMEXIH[MXL
MRZIWXQIRXMRJPSSHTPEMRSGGYTERG]SV
QSHMJMGEXMSRSJJPSSHTPEMRIRZMVSRQIRX
'SQTPIXIH
7XIT4VSGIWW'SQTPIXIHSGYQIRXEXMSR
EXXEGLIH6IZMI[GSRGPYHIH
'SQTPIXIH
)\IGYXMZI3VHIV
;IXPERHW
0SGEXIHMR[IXPERHWSVIJJIGXWSR[IXPERHW 4IVXLI97*MWLERH;MPHPMJI7IVZMGI;IXPERH 1ETTIVZMI[IHSR
XLITVSNIGXMWPSGEXIH
[MXLMREHIWMKREXIH[IXPERH8LITVSTSWIH
EGXMSRMWRSXPMOIP]XSVIWYPXMRER]TSXIRXMEPHMVIGX
MQTEGXWXLEX[MPPEHZIVWIP]EJJIGXXLIREXYVEP
ZEPYIWERHJYRGXMSRSJ[IXPERHW-RMXMEP(MWEWXIV
4YFPMG2SXMGI[EWTYFPMWLIHSR1EVGL
7II'SRHMXMSRWXRI[WSR
+18
'SQTPIXIH
4SWWMFPIEHZIVWIIJJIGXEWWSGMEXIH[MXL
GSRWXVYGXMRKMRSVRIEV[IXPERH
'SQTPIXIH
6IZMI[GSQTPIXIHEWTEVXSJJPSSHTPEMR
VIZMI[6IZMI[GSRGPYHIH
'SQTPIXIH
)\IGYXMZI3VHIV
)RZMVSRQIRXEP.YWXMGIJSV0S[
-RGSQIERH1MRSVMX]4STYPEXMSRW
2S0S[MRGSQISVQMRSVMX]TSTYPEXMSRMR
RIEVSVEJJIGXIHF]XLITVSNIGX6IZMI[
GSRGPYHIH
'SQTPIXIH
)RHERKIVIH7TIGMIW%GX
)7%
0MWXIHWTIGMIWERHSVHIWMKREXIHGVMXMGEP
LEFMXEXTVIWIRXMREVIEWEJJIGXIHHMVIGXP]SV
MRHMVIGXP]F]XLIJIHIVEPEGXMSR
&EWIHSRXLIX]TISJEGXMZMXMIWEWHIWGVMFIHMR
XLIWGSTISJ[SVOXLMWTVSNIGXLEWFIIR
HIXIVQMRIHXSLEZIRSIJJIGXSR*IHIVEPP]PMWXIH
XLVIEXIRIHERHIRHERKIVIHWTIGMIWSVGVMXMGEP
LEFMXEXXRI[WSR
+18
'SQTPIXIH
2SIJJIGXXSWTIGMIWSVHIWMKREXIHGVMXMGEP
LEFMXEX
7IIGSQQIRXWJSVNYWXMJMGEXMSR
6IZMI[GSRGPYHIH
'SQTPIXIH
238)
%PPXMQIWEVI+18YWMRKELSYVGPSGO 4EKISJ Packet Pg. 177 Attachment: FEMA NEPA Determination (4.11(d)--Approval of the Flood Damage Repair Project)
6)' *)()6%0)1)6+)2'=1%2%+)1)28%+)2'=
6)'36(3*)2:-6321)28%0'327-()6%8-32
6)'
4VSNIGX
8MXPI
4%
'%4;
7,'6+'MX]SJ6IHHMRK4EVOW
8VEMPW
)RZMVSRQIRXEP0E[
)\IGYXMZI3VHIV 7XEXYW (IWGVMTXMSR 'SQQIRX
*EVQPERH4VSXIGXMSR4SPMG]%GX
*44%
4VSNIGXHSIWRSXEJJIGXHIWMKREXIHTVMQISV
YRMUYIJEVQPERH6IZMI[GSRGPYHIH
'SQTPIXIH
*MWLERH;MPHPMJI'SSVHMREXMSR
%GX
*;'%
4VSNIGXHSIWRSXEJJIGXGSRXVSPSVQSHMJ]E
[EXIV[E]FSH]SJ[EXIV6IZMI[GSRGPYHIH
'SQTPIXIH
1MKVEXSV]&MVH8VIEX]%GX
1&8%
'SQTPIXIH 4VSNIGXPSGEXIH[MXLMREJP][E]^SRI
4VSNIGXHSIWRSXLEZITSXIRXMEPXSXEOI
QMKVEXSV]FMVHW6IZMI[GSRGPYHIH
'SQTPIXIH
1EKRYWSR7XIZIRW*MWLIV]
'SRWIVZEXMSRERH1EREKIQIRX
%GX
17%
4VSNIGXRSXPSGEXIHMRSVRIEV)WWIRXMEP*MWL
,EFMXEX6IZMI[GSRGPYHIH
'SQTPIXIH
2EXMSREP,MWXSVMG4VIWIVZEXMSR%GX
2,4%
%TTPMGEFPII\IGYXIH4VSKVEQQEXMG
%KVIIQIRX%GXMZMX]QIIXW4VSKVEQQEXMG
%PPS[ERGI
IRXIVHEXIERHMRGSQQIRXW
6IZMI[GSRGPYHIH
8LI9RHIVXEOMRK[EWVIZMI[IHF]'MRH]
8LSQEGO[LSQIIXWXLIETTPMGEFPI7IGVIXEV]SJ
XLI-RXIVMSV4VSJIWWMSREP5YEPMJMGEXMSRWMR
EGGSVHERGI[MXL7XMTYPEXMSR-&ESJXLI
4VSKVEQQEXMG%KVIIQIRXEQSRKXLI*IHIVEP
)QIVKIRG]1EREKIQIRX%KIRG]
*)1%
7XEXI
,MWXSVMG4VIWIVZEXMSR3JJMGI
7,43
ERH
'EPMJSVRME3JJMGISJ)QIVKIRG]7IVZMGIW
'EP
3)7
WMKRIH3GXSFIV8LI9RHIVXEOMRK
GSQTPMIW[MXL*MVWX8MIV4VSKVEQQEXMG%PPS[ERGI
-%
E
(IFVMWVIQSZEPERHGSPPIGXMSR
MRGPYHMRKVIQSZEPSJWRS[YTVSSXIHXVIIWPMQFW
ERHFVERGLIWJVSQTYFPMGVMKLXWSJ[E]ERH
TYFPMGEVIEWEW[IPPEWXLIXVERWTSVXERH
HMWTSWEPSJWYGL[EWXIXSI\MWXMRKPMGIRWIH[EWXI
JEGMPMXMIWSVPERHJMPPW8LMWMRGPYHIWXLIXIQTSVEV]
IWXEFPMWLQIRXERHI\TERWMSRSJRSRLE^EVHSYW
HIFVMWWXEKMRKVIHYGXMSRERHHMWTSWEPEVIEWEX
PMGIRWIHXVERWJIVWXEXMSRWSVI\MWXMRKLEVH
XSTTIHSVKVEZIPIHWYVJEGIW
IKTEVOMRKPSXW
VSEHWEXLPIXMGGSYVXW
FYXRSXXLIGVIEXMSRSJRI[
SVXIQTSVEV]EGGIWWVSEHW
-%
H
7IHMQIRX
VIQSZEPJVSQQERQEHIHVEMREKIJEGMPMXMIW
MRGPYHMRKVIXIRXMSRHIXIRXMSRFEWMRWTSRHW
HMXGLIWERHGEREPWMRSVHIVXSVIWXSVIXLIJEGMPMX]
XSMXWTVIHMWEWXIVGSRHMXMSR8LIWIHMQIRXQE]
FIYWIHMRSVHIVXSVITEMVIVSHIHFEROWSV
HMWTSWIHSJEXERI\MWXMRKPMGIRWIHSVTIVQMXXIH
WTSMPWMXI
7IGSRH8MIV4VSKVEQQEXMG%PPS[ERGI
--%
E
-ROMRHVITEMVVITPEGIQIRXERH
VIMRJSVGIQIRXSJJSSXMRKWJSYRHEXMSRWVIXEMRMRK
[EPPWWPSTIWERHWPSTIWXEFMPM^EXMSRW]WXIQW
IKKEFMSRFEWOIXWGVMF[EPPWWSPHMIVTMPIERH
PEK[EPPW
MJVIPEXIHKVSYRHHMWXYVFMRKEGXMZMXMIW
EVI
'SQTPIXIH
238)
%PPXMQIWEVI+18YWMRKELSYVGPSGO 4EKISJ Packet Pg. 178 Attachment: FEMA NEPA Determination (4.11(d)--Approval of the Flood Damage Repair Project)
6)' *)()6%0)1)6+)2'=1%2%+)1)28%+)2'=
6)'36(3*)2:-6321)28%0'327-()6%8-32
6)'
4VSNIGX
8MXPI
4%
'%4;
7,'6+'MX]SJ6IHHMRK4EVOW
8VEMPW
)RZMVSRQIRXEP0E[
)\IGYXMZI3VHIV 7XEXYW (IWGVMTXMSR 'SQQIRX
[MXLMRXLIFSYRHEV]SJTVIZMSYWP]HMWXYVFIH
WSMPW
--%
E
-ROMRHVITEMVWSVVITPEGIQIRX
ERHQMRSVYTKVEHIWXSVIGVIEXMSREPJEGMPMXMIWERH
JIEXYVIW
IKTPE]KVSYRHWGEQTKVSYRHWJMVI
TMXWHYQTWXEXMSRWERHYXMPMX]LSSOYTW
W[MQQMRKTSSPWEXLPIXMGJMIPHWERHWMKREKI
FEXXMRKGEKIWFEWOIXFEPPGSYVXWW[MRKWIXW
TEXL[E]WWMQTPI[SSHIR[MVIWXVIEQ
GVSWWMRKW
--%
F
-ROMRHVITEMV
VITPEGIQIRXERHQMRSVYTKVEHIWXSPERHWGETMRK
IPIQIRXW
IKJIRGMRKJIIWXERHMRK[EPPW
TEZMRKTPERXIVWMVVMKEXMSRW]WXIQWPMKLXMRK
IPIQIRXWJPEKTSPIWVEQTWWXITW
--'
G
-R
OMRHVITPEGIQIRXSVQMRSVYTKVEHISJGYPZIVX
W]WXIQWERHEVGLIWFIRIEXLVSEHWSV[MXLMR
EWWSGMEXIHHVEMREKIW]WXIQW-RGPYHMRKTVSZMWMSR
SJLIEH[EPPWVMTVETERHER]QSHIWXMRGVIEWIMR
GETEGMX]JSVXLITYVTSWIWSJLE^EVHQMXMKEXMSRSV
XSQIIXGYVVIRXGSHIWERHWXERHEVHWTVSZMHIH
XLEXXLI[SVOWYFWXERXMEPP]GSRJSVQWXSI\MWXMRK
JSSXTVMRX
--'
F
-ROMRHVITEMVSV
VITPEGIQIRXSJFVMHKIWERHFVMHKIGSQTSRIRXW
IKEFYXQIRXW[MRK[EPPWTMIVWHIGOWERH
JIRHIVW
MRTVIZMSYWP]HMWXYVFIHWSMPW
%TTIRHM\
&
SJXLI%KVIIQIRX8LYWXLI9RHIVXEOMRK
HSIWRSXVIUYMVI7,43VIZMI[SVRSXMJMGEXMSRTIV
7XMTYPEXMSR--%SJXLI%KVIIQIRX7II
'SRHMXMSREWEYRHI
+18%QIRHQIRX:3-(%PPS[ERGIW
-%
H
ERH--%
E
%PPSXLIVEPPS[ERGIW
WXEXIHEFSZIEVIWXMPPZEPMHERHETTPMGEFPI
GXLSQEG
+18
;MPHERH7GIRMG6MZIVW%GX
;76
4VSNIGXMWRSXEPSRKERHHSIWRSXEJJIGX;MPH
ERH7GIRMG6MZIV6IZMI[GSRGPYHIH
'SQTPIXIH
7TIGMEP'SRHMXMSRWVIUYMVIHSRMQTPIQIRXEXMSRSJ4VSNIGXW
)\IGYXMZI3VHIV
*PSSHTPEMRW
7YF+VERXIIQYWXGSSVHMREXI[MXLXLIPSGEPJPSSHTPEMREHQMRMWXVEXSVERHSFXEMRVIUYMVIHTIVQMXWTVMSVXSMRMXMEXMRK[SVO%PPGSSVHMREXMSR TIVXEMRMRKXSXLIWIEGXMZMXMIWERH7YF+VERXIIGSQTPMERGI[MXLER]GSRHMXMSRWWLSYPHFIHSGYQIRXIHERHGSTMIWJSV[EVHIHXSXLI7XEXI ERH*)1%JSVMRGPYWMSRMRXLITIVQERIRXTVSNIGXJMPIW
7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
2S
8LI7YF+VERXIIMWVIWTSRWMFPIJSVTVSTIVMHIRXMJMGEXMSRSJ[IXPERHW9RHIV)3
4VSXIGXMSRSJ;IXPERHW8LI7YF+VERXIIMW
VIWTSRWMFPIJSVGSSVHMREXMRK[MXLERHSFXEMRMRKER]VIUYMVIH7IGXMSR4IVQMX W
JVSQXLI9RMXIH7XEXIW%VQ]'SVTWSJ)RKMRIIVW
97%')
TVMSVXSMRMXMEXMRK[SVO8LI7YF+VERXIIWLEPPGSQTP][MXLEPPGSRHMXMSRWSJXLIVIUYMVIHTIVQMX%PPGSSVHMREXMSRTIVXEMRMRKXS XLIWIEGXMZMXMIWWLEPPFIHSGYQIRXIHERHGSTMIWJSV[EVHIHXSXLI'EPMJSVRME3JJMGISJ)QIVKIRG]7IVZMGIWERHXLI*)1%4YFPMG %WWMWXERGI4VSKVEQEWTEVXSJXLITIVQERIRXTVSNIGXJMPIW '32(-8-327
238)
%PPXMQIWEVI+18YWMRKELSYVGPSGO 4EKISJ Packet Pg. 179 Attachment: FEMA NEPA Determination (4.11(d)--Approval of the Flood Damage Repair Project)
6)' *)()6%0)1)6+)2'=1%2%+)1)28%+)2'=
6)'36(3*)2:-6321)28%0'327-()6%8-32
6)'
4VSNIGX
8MXPI
4%
'%4;
7,'6+'MX]SJ6IHHMRK4EVOW
8VEMPW
)\IGYXMZI3VHIV
;IXPERHW
8LI7YF+VERXIIMWVIWTSRWMFPIJSVTVSTIVMHIRXMJMGEXMSRSJ[IXPERHW9RHIV)3
4VSXIGXMSRSJ;IXPERHW8LI7YF+VERXIIMW
VIWTSRWMFPIJSVGSSVHMREXMRK[MXLERHSFXEMRMRKER]VIUYMVIH7IGXMSR4IVQMX W
JVSQXLI9RMXIH7XEXIW%VQ]'SVTWSJ)RKMRIIVW
97%')
TVMSVXSMRMXMEXMRK[SVO8LI7YF+VERXIIWLEPPGSQTP][MXLEPPGSRHMXMSRWSJXLIVIUYMVIHTIVQMX%PPGSSVHMREXMSRTIVXEMRMRKXS XLIWIEGXMZMXMIWWLEPPFIHSGYQIRXIHERHGSTMIWJSV[EVHIHXSXLI'EPMJSVRME3JJMGISJ)QIVKIRG]7IVZMGIWERHXLI*)1%4YFPMG %WWMWXERGI4VSKVEQEWTEVXSJXLITIVQERIRXTVSNIGXJMPIW 7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
=IW
)\IGYXMZI3VHIV
;IXPERHW
8LI7YF+VERXIIWLEPPIRWYVIXLEXFIWXQEREKIQIRXTVEGXMGIWEVIMQTPIQIRXIHXSTVIZIRXIVSWMSRERHWIHMQIRXEXMSRXSWYVVSYRHMRK RIEVF]SVEHNEGIRX[IXPERHW8LMWMRGPYHIWIUYMTQIRXWXSVEKIERHWXEKMRKSJGSRWXVYGXMSRXSTVIZIRXIVSWMSRERHWIHMQIRXEXMSRXSIRWYVI XLEX[IXPERHWEVIRSXEHZIVWIP]MQTEGXIHTIVXLI'PIER;EXIV%GXERH)\IGYXMZI3VHIV
7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
=IW
'PIER;EXIV%GX
';%
8LMWTVSNIGXMWXSXEOITPEGIMRSVRIEV[EXIVWSJXLI97%XLI7YF+VERXIIMWVIUYMVIHXSGSRXEGXXLI97%VQ]'SVTWSJ)RKMRIIVW
97%')
XSHIXIVQMRIERHSFXEMRHSGYQIRXEXMSRSR[LIXLIVTVSNIGXEGXMZMXMIWVIUYMVIE97%')TIVQMXYRHIV7IGXMSRSJXLI'PIER ;EXIV%GX
';%
%PPHSGYQIRXEXMSRTIVXEMRMRKXSTIVQMXWQYWXFIEXXEGLIHXSXLI7YFKVERX%TTPMGEXMSR-JVIUYMVIHMXMWXLIVIWTSRWMFMPMX] SJXLI7YF+VERXIIXSSFXEMRSVSXLIV[MWIUYEPMJ]JSVETIVQMX2SRGSQTPMERGI[MXLXLMWVIUYMVIQIRXQE]NISTEVHM^IVIGIMTXSJ*IHIVEP JMRERGMEPEWWMWXERGI
7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
=IW
2EXMSREP,MWXSVMG4VIWIVZEXMSR%GX
2,4%
'SRHMXMSR
-JFSVVS[QEXIVMEPJSVXLMWTVSNIGXMWRSXHMWEWXIVHMWTPEGIHQEXIVMEPVIGPEMQIHJVSQXLIMQQIHMEXIEVIERSXSFXEMRIHJVSQE WXERHEVHGSQQIVGMEPFSVVS[WSYVGIRSXSFXEMRIHJVSQETIVQMXXIHFSVVS[TMX ERHETIVQMXRYQFIVMWTVSZMHIH
SVRSXSFXEMRIHJVSQE
7YF+VERXIIS[RIHTVII\MWXMRKWXSGOTMPI
ERHXLIGSSVHMREXIWTVSZMHIH
XLI7YF+VERXIIQYWXRSXMJ]*)1%ERHXLI'EPMJSVRME3JJMGISJ )QIVKIRG]7IVZMGIW
'EP3)7
TVMSVXSGSQQIRGMRKFSVVS[I\XVEGXMSRWSXLEXGSQTPMERGI[MXL7IGXMSRSJXLI2EXMSREP,MWXSVMG 4VIWIVZEXMSR%GXGERFIEGGSQTPMWLIH2SRGSQTPMERGI[MXLXLMWVIUYMVIQIRXQE]NISTEVHM^IXLIVIGIMTXSJJIHIVEPJYRHMRK 7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
2S
2EXMSREP,MWXSVMG4VIWIVZEXMSR%GX
2,4%
'SRHXMSR
:IKIXEXMZIHIFVMWQE]FIGLSTTIHSVGLMTTIHERHFVSEHGEWXIHMRXLIMQQIHMEXIEVIESVWXSGOTMPIHJSVHMWXVMFYXMSRSXLIV[MWIMX QYWXFIXEOIRXSERETTVSTVMEXIP]PMGIRWIHTIVQMXXIHPERHJMPPSV[EWXIJEGMPMX] 7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
2S
2EXMSREP,MWXSVMG4VIWIVZEXMSR%GX
2,4%
%PPSXLIVHIFVMWMRGPYHMRKFYXRSXPMQMXIHXS
GSRWXVYGXMSRERHHIQSPMXMSRHIFVMWLSYWILSPHMXIQWI\TSWIHWERHFEKWWERHQYHWMPX KVEZIPVSGOWFSYPHIVWZILMGPI[VIGOEKIERHLE^EVHSYWQEXIVMEPWMRGPYHMRKIPIGXVMGEPXVERWJSVQIVWQYWXFIXEOIRXSERETTVSTVMEXIP] PMGIRWIHTIVQMXXIHPERHJMPP[EWXIJEGMPMX]SVWTSMPWMXI 7SYVGISJGSRHMXMSR
1SRMXSVMRK6IUYMVIH
2S
7XERHEVH'SRHMXMSRW
%R]GLERKIXSXLIETTVSZIHWGSTISJ[SVO[MPPVIUYMVIVIIZEPYEXMSRJSVGSQTPMERGI[MXL2)4%ERHSXLIV0E[WERH)\IGYXMZI3VHIVW 8LMWVIZMI[HSIWRSXEHHVIWWEPPJIHIVEPWXEXIERHPSGEPVIUYMVIQIRXW%GGITXERGISJJIHIVEPJYRHMRKVIUYMVIWVIGMTMIRXXSGSQTP][MXLEPP JIHIVEPWXEXIERHPSGEPPE[W*EMPYVIXSSFXEMREPPETTVSTVMEXIJIHIVEPWXEXIERHPSGEPIRZMVSRQIRXEPTIVQMXWERHGPIEVERGIWQE] NISTEVHM^IJIHIVEPJYRHMRK
-JKVSYRHHMWXYVFMRKEGXMZMXMIWSGGYVHYVMRKGSRWXVYGXMSRETTPMGERX[MPPQSRMXSVKVSYRHHMWXYVFERGIERHMJER]TSXIRXMEPEVGLISPSKMGEP VIWSYVGIWEVIHMWGSZIVIH[MPPMQQIHMEXIP]GIEWIGSRWXVYGXMSRMRXLEXEVIEERHRSXMJ]XLI7XEXIERH*)1% 238)
%PPXMQIWEVI+18YWMRKELSYVGPSGO 4EKISJ Packet Pg. 180 Attachment: FEMA NEPA Determination (4.11(d)--Approval of the Flood Damage Repair Project) Flood Damage Repair Project Page 1
December 2022
MITIGATED NEGATIVE DECLARATION
FLOOD DAMAGE REPAIR PROJECT
(STATE CLEARINGHOUSE NO. 2022100476)
SUBJECT
Flood Damage Repair Project
PROJECT DESCRIPTION
The City of Redding (City) is proposing the Flood Damage Repair Project in the City of Redding, Shasta County, California. In January 2017, heavy rains and severe flooding caused water to overtop embankments along the Sacramento River and local streams, damaging various parks and trails. The purpose of the project is to repair flood-damaged areas within City park and trail areas so that pre-flood design, function, and capacity (in-kind) is achieved. The project is needed so that pedestrians and bicyclists can continue to use the park and trail areas for recreation purposes. The project is led by the City and has received funding assistance from the Federal Emergency Management Agency (FEMA No.
PA-09-CA-4301-PW-00936) to complete the project.
The project consists of twelve work sites, located in four recreational areas: Turtle Bay East, Parkview Park, Blue Gravel Mine Trail, and Enterprise Park. The project will repair seating and viewing areas; as well as trail surfaces, trail embankments, and culverts. Work will include vegetation removal, demolition, excavation, grading, sediment removal, culvert cleaning, erosion repair, culvert installation, and placement of rock slope protection. Work will occur on City property or within easements. Construction is anticipated to take one season and will be completed in the fall of 2023.
ENVIRONMENTAL SETTING
The Turtle Bay East site is located in the Turtle Bay East Open Space Park, which is bisected by State Route 44 and parallel to Interstate 5. A small area near the project site is zoned Residential, and the remaining areas are designated as Open Space-Specific Plan and Public land use. This area includes a network of paved and unpaved trails that traverse riparian woodland habitats and grasslands.
The Parkview Park site is located at the Parkview Riverfront Park and is situated on the western bank of the Sacramento River. This area is designated as Open Space-Specific Plan land use. Land use surrounding the park is primarily commercial and residential development.
The Blue Gravel Mine Trail is located near the intersection of Placer Street and Buenaventura Boulevard.
Land use in the project vicinity includes Open Space, Residential, Commercial, Public, and transportation corridors. The project area includes paved trail area that traverses through a narrow, undeveloped canyon formed by the Blue Gravel Creek.
The Enterprise Park sites are located on the west side of Enterprise Community Park, near the community garden. Surrounding land use includes residential housing and open fields to the south.
Packet Pg. 181 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Mitigated Negative Declaration
December 2022
FINDINGS AND DETERMINATION
The City of Redding conducted an Initial Study (attached) that determined that the proposed project could have significant environmental effects on biological resources. Implementation of specific mitigation measures identified below will avoid or mitigate the potentially significant environmental effects identified, and the preparation of an environmental impact report will not be required. If there are substantial changes that alter the character or impacts of the proposed project, another environmental impact determination will be necessary.
Prior to approval of the project, the lead agency may conclude, at a public hearing, that certain mitigation measures identified in the Mitigated Negative Declaration are infeasible or undesirable. In accordance with California Environmental Quality Act (CEQA) Section 15074.1, the lead agency may delete those mitigation measures and substitute other measures that it determines are equivalent or more effective. The lead agency would adopt written findings that the new measure(s) is(are) equivalent or more effective in mitigating or avoiding potential significant effects and that it would not cause any potentially significant effect on the environment.
1) Based on the whole record (including the Initial Study and any supporting documentation) and the mitigation measures incorporated into the project, the City of Redding has determined that there is no substantial evidence that the project will have a significant effect on the environment. 2) The Mitigated Negative Declaration, with its supporting documentation, reflects the independent judgment and analysis of the lead agency, which is the City of Redding.
DOCUMENTATION
The attached Initial Study documents the reasons to support the above determination.
MITIGATION MEASURES
The following mitigation measures will be incorporated into the project to minimize potential effects on biological resources:
MM-1. All areas to be avoided during construction will be fenced and/or flagged as close to construction limits as possible.
MM-2. Worker Environmental Awareness Training will be conducted by a qualified biologist before the start of work to educate crews regarding the location of the elderberry shrubs, life history and listing status of VELB, and the measures necessary to avoid impacts onto the shrub and VELB habitat (USFWS 2017).
MM-3. A qualified biologist will monitor the work area at project-appropriate intervals to assure that all avoidance and minimization measures are implemented.
MM-4. Activities that involve work within the stream channel and activities within 165 feet of the elderberry shrub will be conducted during the lowest flow period and outside of the flight season of VELB. The work period for the Parkview Park is July 1 to October 31.
Packet Pg. 182 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Mitigated Negative Declaration Public Works Department, Engineering Division Flood Damage Repair Project Page 3
December 2022
MM-5. All construction personnel will be required to attend an environmental awareness training prior to the start of construction. The training will be conducted by a qualified biologist and will familiarize construction personnel with the special status species that may occur onsite, their habitats, provisions and protections, measures to be implemented, and the project boundaries. The training must be provided within 3 days of the arrival of any new worker.
MM-6. Prior to the onset of construction activities, a qualified biologist will conduct preconstruction surveys for western pond turtle, turtle nests, and foothill yellow-legged frog. If these species or turtle nests are observed during the preconstruction survey or during construction, CDFW will be contacted, and work within that area will be avoided until an appropriate course of action is established. If western pond turtle, turtle nests, or foothill yellow-legged frog are not observed during the preconstruction survey, then construction activities may begin. If construction is delayed or halted for more than 7 days, another preconstruction survey will be conducted.
MM-7. If vegetation removal or construction activities will occur during the nesting season for birds or raptors (February 1 through August 31 for birds and November 1 through July 1 for raptors), a qualified biologist will conduct a preconstruction survey seven (7) days before construction activities begin. If nesting birds or raptors are found, CDFW will be notified and consulted. An appropriate buffer, as determined by CDFW and the qualified biologist, will be placed around the nest until the young have fledged. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
MM-8. If an active raptor nest is found, no construction activities will occur within 300-feet of the nest for raptors and 450-feet of the nest for special-status raptors unless a smaller buffer zone is approved by the CDFW. Construction may resume once the young have left the nest or as approved by a qualified biologist.
MM-9. If it is determined that tree removal is required, the removal of trees 10 inches DBH or greater with cavities, crevices, or snags shall occur before bat maternity colonies form (i.e., prior to March 1) or after young are volant (i.e., after August 31), to the extent practical. If construction (including the removal of large trees) occurs during the bat non-volant season (March 1 through August 31), a qualified biologist shall conduct a pre-construction survey of the study area to locate maternity colonies. The preconstruction survey will be performed no more than 7 days prior to the implementation of construction activities. If a maternity colony is located within or adjacent to the study area, a disturbance free buffer shall be established by a qualified biologist, in consultation with CDFW, to ensure the colony is protected from project activities. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
PUBLIC REVIEW DISTRIBUTION
Draft copies or notice of this Mitigated Negative Declaration were distributed to:
State Clearinghouse
Shasta County Clerk
California Department of Transportation District 2
California Department of Fish and Wildlife District 1 Central Valley Regional Water Quality Control Board –Region 5 (Redding) California Highway Patrol
Packet Pg. 183 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) Packet Pg. 184
Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project)
ATTACHMENT A
Vicinity Map
Packet Pg. 185 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) Packet Pg. 186 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project)
ATTACHMENT B
Initial Study
Packet Pg. 187 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project)
CALIFORNIA ENVIRONMENTAL QUALITY ACT
INITIAL STUDY
Flood Damage Repair Project
State Clearinghouse No. 2022100476
PA-09-CA-4301-PW-00936
Prepared by:
CITY OF REDDING
Public Works Department
Engineering Division
777 Cypress Avenue
Redding, California 96001
October 2022
Packet Pg. 188 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) Packet Pg. 189 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) Flood Damage Repair Project Page 1
October 2022
CITY OF REDDING
ENVIRONMENTAL CHECKLIST FORM
1) Project Title:
Flood Damage Repair Project (project)
2) Lead agency name and address:
City of Redding (City)
Public Works Department
777 Cypress Avenue
Redding, CA 96001
3) Contact Person and Phone Number:
Amber Kelley
Environmental Compliance Manager
Phone: (530) 225-4046
Email: [email protected]
4) Project Location:
The proposed project includes four sites, three of which feature multiple work locations: Turtle Bay East, Parkview Park, Blue Gravel Mine Trail, and Enterprise Park in the city of Redding, Shasta County, California (Appendix A).
The Turtle Bay East project sites are located near the Sacramento River, to the north and south of State Route 44, just west of Interstate 5 (Appendix A). The project sites are located in the Enterprise Quadrangle at Township 32 north, Range 4 west, Section 31 (latitude 40° 35' 10.65" N, longitude -122° 21' 57.6" W at the approximate center point of the project sites). The Turtle Bay East project sites intersect Assessor’s Parcel Numbers (APN) 107-160-009, 107-160-021, 107-160-007, and 107-160-020.
The Parkview Park project site is located along the Sacramento River, east of the intersection of Freebridge Street and Parkview Avenue (Appendix A). The project site is located in the Redding Quadrangle at Township 31 north, Range 5 west, Section 1 (latitude 40° 34' 14.16" N, longitude -122° 22' 37.76" W at the approximate center point of the project site). The Parkview Park site intersects APNs 102-470-022 and 102-470-002.
The Blue Gravel Mine Trail sites extend from the intersection of Buenaventura Boulevard and Summit Drive, north to the intersection of Buenaventura Boulevard and Placer Street (Appendix A). The sites are located in the Redding Quadrangle at Township 31 north, Range 5 west, Sections 11, 2, and 3 (latitude 40° 33' 57.36" N, longitude -122° 24' 39.84" W at the approximate center point of the sites).
The Blue Gravel Mine Trail sites intersect APNs 104-040-043, 104-100-032, 104-500-036, and 104- 040-045.
The Enterprise Park sites are located in Enterprise Community Park northwest of the intersection of El Vista Street and Victor Avenue, at the terminus of El Vista Street (Appendix A). The sites are located in the Redding and Enterprise Quadrangles, at Township 31 north, Range 4 west, Section 17 (latitude 40° 32' 45.45" N, longitude -122° 20' 27.7" W at the approximate center point of the sites).
The Enterprise Park sites intersect APN 068-290-004.
Packet Pg. 190 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
5) Applicant’s Name and Address: Representative’s Name and Address:
City of Redding Amber Kelley, City of Redding
Public Works Department Public Works Department
777 Cypress Avenue 777 Cypress Avenue
Redding, CA 96001 Redding, CA 96001
6) General Plan Designation:
City of Redding: Turtle Bay East, Recreation (REC) and Greenway (GWY); Blue Gravel Mine Trail, Public Facilities (PF-I) and Greenway (GWY); Enterprise Park, Greenway (GWY); Parkview Park, Park (PK) and Greenway (GWY)
7) Zoning:
City of Redding: Turtle Bay East, Open Space-Specific Plan (OS-SP) (Redding Riverfront Specific Plan); Blue Gravel Mine Trail, Limited Office (LO), OS; Enterprise Park, Public Facility (PF); Parkview Park, OS-SP, General Commercial-Specific Plan (GC-SP) 8) Description of Project:
In January 2017, heavy rains and severe flooding caused water to overtop embankments along the Sacramento River and local streams, damaging various parks and trails. The Flood Damage Repair Project (FEMA No. PA-09-CA-4301-PW-00936) entails repair at multiple sites damaged by flooding within the Turtle Bay East, Parkview Park, Blue Gravel Mine Trail, and Enterprise Park areas in Redding, California. The project is led by the City and has received funding assistance from the Federal Emergency Management Agency (FEMA) to complete the project. The purpose of the project is to repair flood-damaged areas within City park and trail areas so that pre-flood design, function, and capacity (in-kind) is achieved. The project is needed so that pedestrians and bicyclists can continue to use the park and trail areas for recreation purposes.
The project would include repair to flood-damaged areas within the following City park and trail areas: Turtle Bay East Open Space Park, Parkview Riverfront Park, Blue Gravel Mine Trail, and Enterprise Community Park. The Turtle Bay East site, located within the Turtle Bay East Open Space Park, includes a network of paved and unpaved trails that traverse open space. The Parkview Park site, within Parkview Riverfront Park, is situated in a park on the western bank of the Sacramento River. The site consists of a pedestrian bridge crossing over Linden Ditch, a tributary to the Sacramento River. The Blue Gravel Mine Trail site is along a paved section of Blue Gravel Mine Trail that traverses through a narrow, undeveloped canyon formed by Blue Gravel Creek (also known as Canyon Hollow Creek). The Enterprise Park site within Enterprise Community Park features a scour area on the alluvial terrace of the creek.
The following work would occur at the Turtle Bay East project sites (A, C, D, E, H, and I):
Site A: Replace riprap and geotextile fabric around culvert inlet at edge of Portland cement concrete trail.
Site C: Remove debris and sediment from the inlet, outlet, and inside of clogged culvert pipe; replace riprap basin at outlet.
Sites D and I: Regrade and resurface portions of existing trails with decomposed granite. Site E: Remove and replace steel fence and posts.
Site H: Relocate concrete picnic table to new decomposed granite pad.
The following work would occur at the Parkview Park project site (AA):
The proposed project would replace grouted riprap under and around the south bridge abutment and wingwalls.
The following work would occur at the Blue Gravel Mine Trail project sites (A, B, C, and D):
Packet Pg. 191 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 3
October 2022
Site A: Remove and replace culverts in concrete spillway/low-water crossing, resurface crossing with asphalt concrete (AC).
Site B: Replace filter fabric and riprap on eroded AC trail slope. Site C: Extend pair of existing culverts to bottom of slope; place earth fill and riprap on slope and at culvert outlets.
Site D: Remove debris and sediment from the inlet, outlet, and inside of clogged culvert; place articulated block basin at inlet.
The following work would occur at the Enterprise Park project sites (3 and 4):
Site 3: Remove and replace galvanized steel chain-link fence. Site 4: Replace fill and riprap in eroded embankment. 9) Surrounding Land Uses and Setting:
Turtle Bay East is located in the Turtle Bay East Open Space Park, which is situated in the floodplain of the Sacramento River. The project site is bisected by State Route 44 and parallel to Interstate 5. A small portion, about 0.15 mile to the southeast of the project site, is zoned Residential, and the remaining areas are designated as Open Space-Specific Plan and Public land use. This park includes a network of paved and unpaved trails that traverse riparian woodland habitats and grasslands and a small parking area near the north end of Bechelli Lane.
Parkview Park, located at the Parkview Riverfront Park, is situated on the western bank of the Sacramento River and designated as Open Space-Specific Plan land use. Land use surrounding the park is primarily commercial and residential development. The site consists of a pedestrian bridge that crosses over Linden Ditch, a tributary to the Sacramento River. Streamflow appears to be perennial and subject to backwater flooding from the Sacramento River. The site consists of riparian habitat and has one blue elderberry shrub located at the top of bank.
The Blue Gravel Mine Trail is located near the intersection of Placer Street and Buenaventura Boulevard. Land use in the project vicinity includes Open Space, Residential, Commercial, Public, and transportation corridors. The project area includes paved trail area that traverses through a narrow, undeveloped canyon formed by the Blue Gravel Creek. The Blue Gravel Creek channel is overgrown and poorly defined through much of the canyon.
The Enterprise Park sites are located on the west side of Enterprise Community Park, near the community garden. Surrounding land use includes residential housing and open fields to the south.
The site consists of a scour area on the alluvial terrace of Churn Creek. Vegetation in the scour area consist of primarily non-native, herbaceous species.
10) Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement):
FEMA, State Historic Preservation Office, Office of Emergency Services U.S. Army Corps of Engineers
U.S. Fish and Wildlife Service
California Department of Fish and Wildlife (CDFW)
Regional Water Quality Control Board
11) Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, has consultation begun?
Consultation letters were sent to the Redding Rancheria and the Wintu Tribe of Northern California on July 8 and 13, 2021, to invite their participation in the project development process and to request their assistance in the identification of sites of religious and cultural significance or the identification of historic properties that may be affected by the proposed project. No responses were received.
Packet Pg. 192 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) Packet Pg. 193
Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 5
October 2022
EVALUATION OF ENVIRONMENTAL IMPACTS
This section analyzes the potential environmental impacts associated with the proposed project. The issue areas evaluated in this Initial Study include the following:
Aesthetics Land Use and Planning
Agricultural and Forestry Resources Mineral Resources Air Quality Noise
Biological Resources Population and Housing
Cultural Resources Public Services
Energy Recreation
Geology and Soils Transportation/Circulation
Greenhouse Gas Emissions Tribal Cultural Resources
Hazards and Hazardous Materials Utilities and Service System Hydrology and Water Quality Wildfire
The environmental analysis in this section is patterned after the Initial Study Checklist recommended by the State CEQA Guidelines and used by the City of Redding in its environmental review process. For the preliminary environmental assessment undertaken as part of the preparation of this Initial Study, a determination that there is a potential for significant effects indicates the need to more fully analyze the impact of the development and to identify mitigation.
For the evaluation of potential impacts, the questions in the Initial Study Checklist are stated, and an answer is provided according to the analysis undertaken as part of the Initial Study. The analysis considers the long-term, direct, indirect, and cumulative impacts of the development. To each question, there are four possible responses:
No Impact. The development will not have any measurable environmental impact on the environment.
Less than Significant Impact. The development will have the potential for impacting the environment, although this impact will be below established thresholds that are considered to be significant.
Potentially Significant Impact Unless Mitigation Incorporated. The development will have the potential to generate impacts which may be considered as a significant effect on the environment, although mitigation measures or changesto the development’s physical or operational characteristics can reduce these impacts to levels that are less than significant. Potentially SignificantImpact. The development will have impacts which are considered significant, and additional analysisisrequired to identify mitigation measures that could reduce these impacts to less than significant levels.
Where potential impacts are anticipated to be significant, mitigation measures will be required, so that impacts may be avoided or reduced to insignificant levels.
Packet Pg. 194 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
Prior environmental evaluations applicable to all or part of the project site follow:
City of Redding General Plan
Shasta County General Plan
LIST OF APPENDICES/REFERENCES
Appendix A: Figure 1 - Vicinity Map
Appendix B: Biological Resources Assessment, Jacobs 2022* Appendix C: Cultural Resources Assessment, Jacobs 2022* Appendix D: Aquatic Resources Delineation Report, Jacobs 2022* Appendix E: Biological Assessment, Jacobs 2022*
*Appendices are on file in the Public Works Department - Engineering Division Packet Pg. 195 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 7
October 2022
AESTHETICS
I. AESTHETICS: Except as provided in Public Resources Code Section 21099, would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Have a substantial adverse effect on a scenic vista? X b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway?
X
c) In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that area experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
X
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
X
Discussion:
a) No Impact. No features within the project area are designated as a scenic vista, and nothing within the project area could be characterized as a scenic vista (Caltrans 2021). Therefore, there would be no impact.
b) No Impact. No designated state scenic vistas or highways are within or near the project area (Caltrans 2021. Projected project construction activities would not damage scenic resources including, but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway. Therefore, there would be no impact.
c) No Impact. The project area includes four different sites, each of which is located in an urbanized area. The project would not conflict with applicable zoning or other regulations governing scenic quality (Caltrans 2021). Therefore, there would be no impact. d) No Impact. The project would repair the damaged areas in kind and would not introduce elements that would create a new source of light or glare.
Documentation:
City of Redding. 2000. City of Redding General Plan, Natural Resources Element. City of Redding Zoning Ordinance, Chapter 18.40.090.
California Department of Transportation (Caltrans). 2021. California Scenic Highway Mapping System. Accessed March 2021.
Mitigation:
None necessary.
Packet Pg. 196 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
AGRICULTURAL RESOURCES
II. AGRICULTURE RESOURCES: In determining whether
impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
X
b) Conflict with existing zoning for agricultural use, or a Williamson Act Contract?
X
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
X
d) Result in the loss of forest land or conversion of forest land to non-forest use?
X
e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
X
Discussion:
a) No Impact. There is no Prime Farmland, Unique Farmland, or Statewide Importance (Farmland), in the project area (FMMP 2021). Therefore, there would be no impact. b) No Impact. There is no existing zoning for agricultural use, or a Williamson Act Contract, in the project area (CDC 2021). Therefore, there would be no impact. c) No Impact. The project would not conflict with existing zoning and would not cause the rezoning of forest land or timberland.. Therefore, there would be no impact. d) No Impact. There is no forest land in the project area. Therefore, there would be no impact. e) No Impact. There is no farmland or forest land in the project area. Therefore, there would be no impact.
Documentation:
City of Redding. 2000. City of Redding General Plan, Natural Resources Element. Shasta County. 2018. Shasta County General Plan, Chapter 6, Section 6.1 “Agricultural Lands.” Shasta County Department of Resource Management.
Packet Pg. 197 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 9
October 2022
City of Redding. 2021. City of Redding GIS Parcel and Zoning Map Viewer. California Department of Conservation (CDC). 2021. Farmland Mapping and Monitoring Program (FMMP) of the California Resources Agency. Accessed March 2021. https://www.conservation.ca.gov/dlrp/fmmp/Pages/Shasta.aspx. California Department of Conservation (CDC). 2021. California Important Farmland Finder.
Accessed November 2021. https://maps.conservation.ca.gov/dlrp/ciff/.
Mitigation:
None necessary.
AIR QUALITY
III. AIR QUALITY: Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
Potentially
Significant
Impact
Less thanSignificant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Conflict with or obstruct implementation of the applicable air quality plan?
X
b) Result in a cumulatively considerable net increase of any criteria pollutant forwhich the project region is non-attainment under an applicable Federal or State ambient air quality standard? X
c) Expose sensitive receptors to substantial pollutant concentrations? X d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
X
Discussion:
a) Less than Significant Impact. Project-related construction activities would last several months, and construction emissions impacts would be temporary in nature. Emissions from project construction are anticipated to be minimal due to the limited amount of construction equipment and number of vehicles to be used. Operation of the project would not cause emission increases compared to the existing conditions. The project would be constructed in compliance with the State and the local air district regulations, and best management practices (BMPs) would be implemented to reduce criteria pollutant emissions. Compliance with applicable regulations and implementation of BMPs during project construction would result in less than significant impacts related to air quality. b, c) Less than Significant Impact. The proposed project is within the City of Redding in Shasta County, which is at the northern end of the Northern Sacramento Valley Air Basin (NSVAB). The NSVAB is bounded on the north and west by the Coastal Mountain Range and on the east by the southern portion of the Cascade Mountain Range and the northern portion of the Sierra Nevada range. These mountain ranges form a substantial physical barrier to locally created pollution as well as pollution transported northward on prevailing winds from the Sacramento metropolitan area.
In 1994, the air districts in the Northern Sacramento Valley Planning Area (NSVPA), which includes the Shasta County Air Quality Management District (SCAQMD) jurisdiction, prepared an Air Quality Attainment Plan for ozone. This plan was updated in 1997, 2000, 2003, 2006, 2009, 2012, and again in 2015. Like the preceding plans, the 2015 plan focuses on the adoption and implementation of control measures for stationary sources, area-wide sources, indirect sources, and public information and education programs. The 2015 plan also addresses the effect that pollutant transport has on NSVPA’s ability to meet and attain the State standards. The Air Quality Attainment Plan provides local guidance for air basins to achieve attainment of ambient air quality standards.
Packet Pg. 198 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
Areas that meet ambient air quality standards are classified as attainment areas, and areas that do not meet these standards are classified as nonattainment areas. Areas for which there is insufficient data available are designated unclassified. The attainment status for the Shasta County portion of the NSVAB is included in the table below. The region is nonattainment for State ozone and PM10 standards.
NAAQS and CAAQS Attainment Status for Shasta County
Criteria Pollutants State Designation Federal Designation Ozone Nonattainment Unclassified/Attainment
Particulate matter less than 10 microns in aerodynamic diameter (PM10) Nonattainment Unclassified Particulate matter less than 2.5 microns in aerodynamic diameter (PM2.5) Attainment Unclassified/Attainment Carbon monoxide (CO) Unclassified Unclassified/Attainment Nitrogen dioxide (NO2) Attainment Unclassified/Attainment Sulfur dioxide (SO2) Attainment Unclassified
Source: California Air Resources Board, 2018, http://www.arb.ca.gov/desig/adm/adm.htm The proposed project has the ability to release air pollutants into the ambient air; therefore, construction activities under the proposed project fall under the ambient air quality standards promulgated at the State and federal levels. The federal Clean AirAct of 1971 and the Clean Air Act Amendments (1977) established the national ambient air qualitystandards (NAAQS), which are promulgated by the U.S. Environmental Protection Agency for criteria pollutants including ozone, CO, NO2, SO2, PM10, PM2.5, and lead. The State of California has also adopted its own California ambient air quality standards (CAAQS), which are promulgated by the California Air Resource Board (CARB). CAAQS include standards for criteria pollutants as well as sulfates, hydrogen sulfide, vinyl chloride, and visibility-reducing particles. These standards are designed to protect the health and welfare of the populace with a reasonable margin of safety. Implementation of the project would occur in the Shasta County portion of the NSVAB, which is under the air quality regulatory jurisdiction of SCAQMD and is subject to the rules and regulations adopted by the air district to achieve the NAAQS and CAAQS.
The project would result in temporary construction emissions of nonattainment pollutants, which include ozone precursors of reactive organic gases (ROG) and oxides of nitrogen (NOx), and PM10.
Emission thresholds within the City’s General Plan Air Quality Element are based on the SCAQMD thresholds as listed in the table below.
City of Redding and SCAQMD Thresholds of Significance
Threshold Emissions (pounds per day)
NOx ROG PM10
Level A Thresholds 25 25 80
Level B Thresholds 137 137 137
Source: City of Redding General Plan, SCAQMD
Construction of the project would only last approximately 8 months and requires a limited amount of construction equipment and number of vehicles, which would include an excavator, a small crane, and a work trucks. Construction emissions of ROG, NOx, and PM10 are anticipated to be minimal and would not exceed the SCAQMD’s Level A thresholds. There would not be operational emission increases once the project construction is completed. Therefore, the project would not have cumulatively considerable emissions increases; thus, it would have less than significant impacts.
Packet Pg. 199 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 11
October 2022
Nevertheless, City standards (implemented through the Grading Ordinance and Uniform Building Code) require implementation of the following conservation measures and best management practices (BMPs) that contribute to achieving the City’s goal of at least a 20 percent reduction in emissions or the best reduction otherwise feasible. The following standard conservation measures and BMPs will be used during construction to limit dust and PM10 emissions:
AQ-1. Nontoxic soil stabilizers will be applied according to manufacturer’s specification to all inactive construction areas.
AQ-2. All grading operations will be suspended when winds (as instantaneous gusts) exceed 20 miles per hour.
AQ-3. Stockpiles, access roads, and disturbed or exposed areas will be watered, as necessary, to prevent airborne dust.
AQ-4. Pursuant to the California Vehicle Code (Section 23114€4) (California Legislative Information 2016), all trucks hauling soils and other loose material to and from the construction site will be covered or will maintain at least 6 inches of freeboard (i.e., minimum vertical distance between top of load and the trailer).
AQ-5. All public roadways used by the project contractor will be maintained free from dust, dirt, and debris caused by construction activities. Streets will be swept at the end of the day if visible soil materials are carried onto adjacent public paved roads.
Potential impacts on neighboring homes (sensitive receptors) due to construction-related fugitive dust would be temporary, localized, and minor, and any impact would be less than significant. d) No Impact. The project would not create emissions that could generate objectionable odors affecting a substantial number of people. Therefore, the project would result in no impact with regard to odor.
Documentation:
City of Redding. 2000. City of Redding General Plan, Air Quality Element. Shasta County. 2004. Shasta County General Plan. Chapter 6, Section 6.5 “Air Quality”. Shasta County Department of Resource Management.
City of Redding. 2000. City of Redding General Plan Final Environmental Impact Report. Chapter
8.6, Air Quality. SCH #1998072103.
California Air Resources Board (CARB). 2017. Area Designations Maps/State and National.
Accessed November 2021. http://www.arb.ca.gov/desig/adm/adm.htm.
Mitigation:
None necessary.
Packet Pg. 200 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
BIOLOGICAL RESOURCES
IV. BIOLOGICAL RESOURCES: Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
X
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
X
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
X
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
X
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
X
f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community, Conservation Plan, or other approved local, regional, or State habitat conservation plan?
X
Discussion:
A Biological Resources and Habitat Assessment was prepared to assess the impacts of the proposed project on biological resources in the project area and vicinity (Jacobs 2022a). Studies included research, database review, species list review, habitat assessment survey, biological reconnaissance survey, and a delineation of jurisdictional waters. In addition, a Biological Assessment was prepared to assess the impact of the proposed project on endangered species. The project was also reviewed by the FEMA Environmental and Historic Preservation Office (EHP) for compliance with the National Environmental Policy Act (NEPA) and the Endangered Species Act.
a) Less than Significant with Mitigation Incorporated. The project area supports habitat for several special-status wildlife species, but does not support habitat for any special status plant species.
An environmental review and assessment was conducted by FEMA in 2018 (Cal OES 2018). The project was determined to have no effect on federally listed threatened and endangered species or critical habitat; however, when field reviews were conducted by the City and Jacobs it was determined that one of the four project sites, the Parkview Park site, is located in an area with potential to affect species listed in the federal Endangered Species Act of 1973, as amended (ESA).
Jacobs has prepared a biological assessment (BA) on behalf of the City to assist in evaluating the potential effects on threatened and endangered species, and their critical habitat, that may occur as a result of the project. The City concurs with FEMA’s determination that the Turtle Bay East, Enterprise Park, and Blue Gravel Mine Trail sites do not have potential to affect ESA-listed species or Packet Pg. 201 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 13
October 2022
designated critical habitat; therefore, the remaining ESA discussion focuses on the Parkview Park site.
Valley Elderberry Longhorn Beetle – VELB (Desmocerus californicus dimorphus):
The Parkview Park site is situated in a park on the west bank of the Sacramento River in central Redding. Land use surrounding the park is primarily commercial and residential development. The site consists of a pedestrian bridge crossing over Linden Ditch, a small tributary of the Sacramento River. Streamflow appears to be perennial, and the site is subject to backwater flooding from the Sacramento River. The riparian zone is confined to the streambanks; the surrounding area is landscaped and maintained as a park.
Vegetation in the riparian zone consists of California grape (Vitis californica), blackberry (Rubus ursinus and R. armeniacus), willow thickets (Salix spp.), and valley oak (Quercus lobata). There is one blue elderberry (Sambucus nigra ssp. caerulea) shrub at the top of bank. The shrub is located west of the concrete pathway on the south side of the Linden Ditch Bridge. The elderberry shrub at the Parkview Park site is considered to be potential habitat for VELB. However, the shrub is in a park setting and appears isolated from other elderberry shrubs. No exit holes were observed on the shrub, suggesting that it is not likely to be occupied by VELB.
Activities within 165 feet of the elderberry will be limited to surface activity, including equipment transporting filter fabric and riprap down to the work area. Access to the south bank will require equipment operation on the concrete pathway adjacent to the elderberry shrub. The shrub would not require trimming for access. Consistent with U.S. Fish and Wildlife Service criteria, the dripline of the shrub will be fenced prior to construction for avoidance and protection. The existing concrete walkway and pad would provide adequate protection to any underlying roots that may extend beyond the dripline of the elderberry shrub.
The initial environmental review was completed by CalOES and FEMA EHP; therefore, consultation with the USFWS for VELB will be conducted by the U.S. Army Corps of Engineers during the Section 404 permitting process. Based on the BA prepared by Jacobs, the City recommends the following determinations:
• The project may affect, but is not likely to adversely affect VELB (Desmocerus californicus dimorphus)
• There will be no effect on designated critical habitat for VELB (Desmocerus californicus dimorphus)
While the project is not anticipated to have direct or indirect effects to the elderberry shrub or result in take of VELB, avoidance and minimization measures from the Framework for Assessing Impacts to the Valley Elderberry Longhorn Beetle (USFWS 2017) would be implemented. With implementation of mitigation measures (MM) 1 through 4, the project would have a less than significant impact on VELB habitat.
Special Status Fish Species
The following federal and state listed fish species have the potential to occur in or adjacent to the Parkview project area:
• green sturgeon (southern distinct population segment [DPS]; Acipenser medirostris; federally threatened [FT])
Packet Pg. 202 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
• Sacramento River winter-run Chinook salmon (Oncorhynchus tshawytscha; federally endangered [FE], state endangered)
• Central Valley spring-run Chinook salmon (Oncorhynchus tshawytscha; FT, state threatened) • Central Valley steelhead (Oncorhynchus mykiss; FT)
The project area is not within critical habitat for these species, but critical habitat does occur in the Sacramento River adjacent to the project. The project area is designated essential fish habitat for Pacific Chinook Salmon, pursuant to the Magnuson-Stevens Fishery Conservation and Management Act. Linden Ditch is unlikely to support spawning of salmonids, but non-natal rearing of Chinook salmon and steelhead is possible because the site is subject to backwater flooding from the Sacramento River.
Repair work at this location is limited to in-kind replacement of grouted riprap under and around the bridge abutments. The work area consists of dirt and remnants of the original scour protection riprap.
Water will not be present in the work area during project activities; therefore, direct effects to salmonids and essential fish habitat (EFH) from in-water work or dewatering will not occur.
Moreover, only pedestrian access in dry conditions below the ordinary high water mark (OHWM) of Linden Ditch is anticipated, avoiding adverse effect to EFH or the adjacent designated critical habitat for aquatic species. There is no riparian vegetation beneath the bridge or around the abutments; therefore, riparian vegetation would not be impacted.
The environmental review has been completed by CalOES and FEMA EHP; therefore, consultation with the USFWS for VELB will be conducted by the U.S. Army Corps of Engineers during the Section 404 permitting process. Based on the BA prepared by Jacobs, the City recommends the following determinations. The project will have no effect to the following species or designated critical habitat for Green sturgeon (southern distinct population segment [DPS]), Sacramento River winter-run Chinook salmon, Central Valley spring-run Chinook salmon, Central Valley steelhead; and the project will have no adverse effect to EFH designated for Pacific Chinook salmon, pursuant to the Magnuson-Stevens Fishery Conservation and Management Act for Central Valley spring-run Chinook salmon, Sacramento River winter-run Chinook salmon, and Central Valley steelhead.
Although the project is not anticipated to effect anadromous fish species, MM-4 will be implemented to ensure work would occur in dry conditions and water would not be present. With implementation of this measure, the project would have a less than significant impact on anadromous fish species.
In addition, standard conservation measures and BMPs BIO-1 through BIO-8 are incorporated into all projects that require earthwork, equipment use, work near streams, and concrete work near streams.
BIO-1. As required by the City of Redding Stormwater Quality Management and Discharge Control Ordinance, an erosion and sediment control plan (ESCP) or will be prepared to address BMPs that will be used to prevent erosion and sediment loss. The ESCP must also address dust control, spill control, pollution control, waste management, equipment maintenance and fueling, and materials storage within the project site.
BIO-2. Appropriate erosion and sediment control measures (e.g., silt fences, straw wattles) shall be in place prior to the onset of construction activities near jurisdictional waters and in project areas where there is a potential for surface runoff to drain into jurisdictional waters. The measures shall be monitored and maintained until construction activities have ceased.
BIO-3. High visibility fencing, flagging, or markers will be installed along the edges of the work zone near avoided waters and riparian areas. In addition, equipment entry and exit points; and staging, storage, and stockpile areas must be clearly marked prior to the entry of mechanized equipment or vehicles into the construction area.
Packet Pg. 203 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 15
October 2022
BIO-4. The contractor will install the necessary containment structures to control the placement of wet concrete and to prevent it from entering into the channel outside of those structures.
BIO-5. When the contractor is pouring or working with wet concrete there will be a designated monitor to inspect the containment structures and ensure that no concrete or other debris enters into the channel outside of those structures.
BIO-6. No concrete shall be poured within the ordinary high-water mark (OHWM) if the 15-day weather forecast indicates any chance of rain greater than 30 percent.
BIO-7. Concrete washout will occur in a designated and appropriately prepared area setback at least 100 feet from the riparian area.
BIO-8. Poured concrete will be excluded from the wetted channel for a period of 30 days after it is poured. Commercial sealants may be applied to the poured concrete surface where difficulty in excluding water flow for a long period may occur. If sealant is used, water shall be excluded from the site until the sealant is dry.
Foothill Yellow-legged Frog (Rana boylii)
The project could adversely affect foothill yellow-legged frog if individuals were present in the project area during construction. Potential direct effects include harassment, injury, and mortality of individuals due to equipment and vehicle traffic. The species may also be affected if construction activities result in degradation of aquatic habitat and water quality due to erosion and sedimentation, and accidental fuel leaks or spills.
Aquatic habitat in the survey area is not typical of the species breeding habitat, and dispersal through the project area is considered unlikely because of lack of local breeding habitat. However, three occurrences of the species have been reported within a 5-mile radius of the project area, and suitable habitat for foothill yellow-legged frog may exist along the banks of the Sacramento River. With incorporation of MM-5 and MM-6, impacts on foothill yellow-legged frog would be less than significant. In addition, standard conservation measures and BMPs HAZ-1 through HAZ-5 and BIO-1 through BIO-8 are requirements of the project and will further reduce potential impacts.
Western Pond Turtle (Actinemys marmorata): state species of special concern Suitable habitat for western pond turtle exists at the Turtle Bay East and Parkview Park sites. The study area includes suitable basking sites (e.g., woody debris and rocks) and the adjacent upland habitats may be used for nesting.
Direct impacts to this species could include injury or mortality of individual turtles; temporary impediments to dispersal along the stream channel, or the removal of vegetation. Indirect impacts could include potential sedimentation of downstream habitats or the reduction of suitable upland habitat for basking and nesting. While no western pond turtles were found during the biological survey, pre-construction surveys and construction requirements will be used to reduce potentially significant impacts to this species.
With incorporation of MM-5 and MM-6, impacts on western pond turtle would be less than significant. In addition, standard conservation measures and BMPs HAZ-1 through HAZ-5 and BIO-1 through BIO-8 are requirements of the project and will further reduce potential impacts.
Packet Pg. 204 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
Migratory Birds and Raptors
Construction activities would occur during the avian breeding season (generally February through August for birds, and November through July for raptors) and could disturb nesting birds in or adjacent to the project area. Construction-related disturbance could result in the incidental loss of fertile eggs or nestlings, or nest abandonment. Impacts could result from tree removal, noise from construction activities, as well as ground disturbance such as grubbing and grading.
The project activities at Turtle Bay East, Parkview, and Enterprise Park do not require tree removal and large woody vegetation would be retained. Tree removal will be required at one location, the Blue Gravel Mine Trail - Site C. Extending the pair of existing culverts to the bottom of slope will require the removal of three trees that are less than 6-inches diameter at breast height (DBH).
Tree Removal
Location Type of Tree Size of Tree (DBH)
Blue Gravel Mine Trail – Site C Choke Cherry 2-inches
Blue Gravel Mine Trail – Site C Choke Cherry 5-inches
Blue Gravel Mine Trail – Site C Interior Live Oak 5-inches Each project area contains abundant avian nesting and foraging habitat and similarly suitable habitat occurs in the project vicinity. Foraging birds and birds present in, or adjacent to the project area would not be adversely impacted by construction activities due to their high mobility and available habitat outside of the project area. While tree removal is limited, construction activity could also disturb nesting raptors. Due to the proximity to potential nesting habitat, and potential for specialstatus migratory birds and raptors to occur in the project areas, MM-7 and MM-8 will be used to ensure impacts are avoided or minimized by requiring pre-construction surveys and use of protection measures for any potential nests found to occur within the project area. With implementation of these measures, the project would have a less than significant impact on migratory birds and raptors.
Tree-roosting Bats
Potentially suitable habitat is present at all four project sites for tree-roosting bats such as western red bat. Vegetation in the area also provides potential foraging habitat. Western red bats may roost individually or in small groups in the riparian trees. If a tree is removed that contains a western red bat nursery colony, the removal could result in mortality or injury of individuals. Indirect impacts may occur from construction disturbance if a bat with pups is present in or adjacent to the study area.
Significant noise disturbance could result in mothers temporarily or permanently leaving their pups.
The proposed project will not require the removal of trees that provide suitable roosting habitat and due to the ability of individual bats to move away from disturbance, direct impacts on bats are not expected. While no bat roosts were found during the biological surveys, pre-construction surveys and construction requirements will be used to reduce potentially significant impacts to bat species. With incorporation of MM-5 and MM-9, impacts on bat species would be less than significant. b) Less than Significant Impact. Valley foothill riparian is considered a sensitive natural community with the project area; however, construction would occur in previously disturbed areas, as the intended purpose is to restore trail and culvert areas damaged by flooding. While these areas are considered potential riparian habitat, they did not contain riparian vegetation prior to the storm event and most areas lack vegetation at this time. Vegetation that is present primarily consists of opportunistic species such as tree of heaven, poison oak, ruderal grasses. The project does not require the removal of large trees and large woody vegetation would be retained.
The trail, bank, and culvert repair, would result in a permanent loss of 0.03 acre of potential habitat and the temporary loss of 0.12 acre of potential habitat. The impacts would not be considered Packet Pg. 205 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 17
October 2022
significant because the project was designed, and would be constructed, to restore trail areas to preflood function and condition. The project would have a less than significant impact on riparian habitat and sensitive natural communities. Hydroseed with native seed mix will be applied to all disturbed areas.
c) Less than Significant Impact. On July 28 and 29, 2020, Jacobs conducted an aquatic resource (i.e., wetlands and non-wetland waters) delineation for the project. While all project areas are near the Sacramento River or a stream, some of the work sites are in upland areas, some would be exempt from the Clean Water Act (CWA) Section 401 and 404 as a maintenance activity (in-kind repair), and others are exempt as they convey only roadway runoff (NPDES). However, the U.S. Army Corps of Engineers would need to issue an Approved Jurisdictional Determination (referred to as an AJD) to disclaim CWA jurisdiction over these aquatic resources.
If the U.S. Army Corps of Engineers determines that all locations and activities do fall under CWA jurisdiction, the project would permanently impact 0.007 acre of ephemeral and intermittent stream, and temporarily impact 0.009 acre of ephemeral and intermittent stream. The project would have no impact to wetlands, and no work would occur in the Sacramento River. In-water construction activities will be conducted during the dry season and in compliance with the work windows in the regulatory permits issued by the CDFW, CVRWQCB, and the U.S. Army Corps. The impact of the project on waters of the United States would be less than significant. Standard conservation measures and BMPs HAZ-1 through HAZ-5 and BIO-1 through BIO-8 are requirements of the project and will further reduce potential impacts.
d) Less than Significant Impact. The proposed trail repair project would not disrupt the habitat connectivity in the project area. Although wildlife may avoid the active construction areas, which are small spot locations, the work sites are located in large open space areas with adjacent habitat area for travel. Construction will be short in duration and would occur during daylight hours when recreational user presence is high and wildlife use is low. The project would not permanently interfere with the movement of native wildlife. Impacts on wildlife migratory and travel corridors would be less than significant.
e) No Impact. There project would not conflict with any local policies or ordinances protecting biological resources.
f) No Impact. There are no Habitat Conservation Plans, Natural Community Conservation Plans, or other approved local, regional, or state habitat conservation plan covering the proposed project area.
Therefore, there would be no impact.
Documentation:
City of Redding. 2000. City of Redding General Plan, Natural Resources Element. City of Redding Municipal Code, Chapter 18.45, Tree Management Ordinance. California Department of Fish and Wildlife (CDFW). 2021. California Natural Diversity Database.
Accessed March 2021. https://wildlife.ca.gov/Data/CNDDB. Graham Matthews & Associates (GMA). 2008. Churn Creek Fisheries Restoration Assessment:
Constraints and Restoration Opportunities. Prepared for Western Shasta Resource Conservation District. March.
Jacobs. 2022. Aquatic Resources Delineation Report.
Jacobs. 2022. Biological Resources and Habitat Assessment. Jacobs. 2022. Biological Assessment.
North State Resources. 2007. Stillwater–Churn Creek Watershed Assessment. Prepared for Western Shasta Resource Conservation District. February.
U.S. Fish and Wildlife Service (USFWS). 2017. Framework for Assessing Impacts to the Valley Elderberry Longhorn Beetle.
Packet Pg. 206 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
Mitigation:
MM-1. All areas to be avoided during construction will be fenced and/or flagged as close to construction limits as possible.
MM-2. Worker Environmental Awareness Training will be conducted by a qualified biologist before the start of work to educate crews regarding the location of the elderberry shrubs, life history and listing status of VELB, and the measures necessary to avoid impacts onto the shrub and VELB habitat (USFWS 2017).
MM-3. A qualified biologist will monitor the work area at project-appropriate intervals to assure that all avoidance and minimization measures are implemented.
MM-4. Activities that involve work within the stream channel and activities within 165 feet of the elderberry shrub will be conducted during the lowest flow period and outside of the flight season of VELB. The work period for the Parkview Park is July 1 to October 31.
MM-5. All construction personnel will be required to attend an environmental awareness training prior to the start of construction. The training will be conducted by a qualified biologist and will familiarize construction personnel with the special status species that may occur onsite, their habitats, provisions and protections, measures to be implemented, and the project boundaries. The training must be provided within 3 days of the arrival of any new worker.
MM-6. Prior to the onset of construction activities, a qualified biologist will conduct preconstruction surveys for western pond turtle, turtle nests, and foothill yellow-legged frog. If these species or turtle nests are observed during the preconstruction survey or during construction, CDFW will be contacted, and work within that area will be avoided until an appropriate course of action is established. If western pond turtle, turtle nests, or foothill yellow-legged frog are not observed during the preconstruction survey, then construction activities may begin. If construction is delayed or halted for more than 7 days, another preconstruction survey will be conducted.
MM-7. If vegetation removal or construction activities will occur during the nesting season for birds or raptors (February 1 through August 31 for birds and November 1 through July 1 for raptors), a qualified biologist will conduct a preconstruction survey seven (7) days before construction activities begin. If nesting birds or raptors are found, CDFW will be notified and consulted. An appropriate buffer, as determined by CDFW and the qualified biologist, will be placed around the nest until the young have fledged. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
MM-8. If an active raptor nest is found, no construction activities will occur within 300-feet of the nest for raptors and 450-feet of the nest for special-status raptors unless a smaller buffer zone is approved by the CDFW. Construction may resume once the young have left the nest or as approved by a qualified biologist.
MM-9. If it is determined that tree removal is required, the removal of trees 10 inches DBH or greater with cavities, crevices, or snags shall occur before bat maternity colonies form (i.e., prior to March 1) or after young are volant (i.e., after August 31), to the extent practical. If construction (including the removal of large trees) occurs during the bat non-volant season (March 1 through August 31), a qualified biologist shall conduct a pre-construction survey of the study area to locate maternity colonies. The preconstruction survey will be performed no more than 7 days prior to the implementation of construction activities. If a maternity colony is located within or adjacent to the study area, a disturbance free buffer shall be established by a qualified biologist, in consultation with CDFW, to ensure the colony is protected from project activities. If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.
Packet Pg. 207 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 19
October 2022
CULTURAL RESOURCES
V. CULTURAL RESOURCES: Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5?
X
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5?
X
c) Disturb any human remains, including those interred outside of formal cemeteries?
X
Discussion
a) Less than Significant Impact. Background research completed as part of this project included a records search from the California Historical Resources Information System (CHRIS) and a review of properties listed in/as the National Register of Historic Places and California Register of Historical Resources, California Historical Landmarks, and California Points of Historical Interest, or listed in a local register of significant resources. Additionally, the City reviewed records search information and past cultural resources survey and report data. As a result of this review, no previously recorded cultural resources are known to exist within the area of potential effects or within the boundaries of Turtle Bay East, Parkview Park, Blue Gravel Mine Trail, and Enterprise Park. The project would not cause an adverse change in a historical resource; and therefore, the impact would be less than significant.
b, c) Less than Significant Impact. Although the Turtle Bay East and Parkview Park project sites are located near the Sacramento River, which has a relatively high potential for cultural resources, no previously recorded archaeological or prehistoric resources have been identified in the project area.
The project area has been subject to previous disturbances such as the creation of paved and unpaved trailways. Although these efforts did not identify historical or archaeological resources within the project area, the following standard conservation measures are included in every project involving ground disturbance. In the event of an unanticipated discovery, impacts would be less than significant:
CR-1. If previously unidentified cultural materials are unearthed during construction, it is the City’s policy that work be halted in that area until a qualified archaeologist can assess the significance of the find. Additional archaeological surveys will be needed if the proposed project undertaking limits are extended beyond the present survey APE limits. CR-2. If human remains are discovered during project activities, all activities in the vicinity of the find will be stopped, and the Shasta County Sheriff-Coroner’s Office will be notified. If the coroner determines that the remains may be those of a Native American, the coroner will contact the Native American Heritage Commission (NAHC). Treatment of the remains will be conducted in accordance with further direction of the County Coroner or NAHC, as appropriate.
Documentation:
City of Redding. City of Redding General Plan, Natural Resources Element. Jacobs. 2022. Cultural Resources Assessment.
Packet Pg. 208 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
Mitigation:
None necessary.
ENERGY
V. Energy: Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy, or wasteful use of energy resources, during
project construction or operation?
X
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
X
Discussion:
a) Less than Significant Impact. The project would not permanently alter energy use because it would not result in an increase in vehicle travel or an increase in carbon emissions; therefore, direct energy use would involve the short-term use of energy for construction activities. Project construction would primarily consume diesel and gasoline through operation of construction equipment, material deliveries, and debris hauling. Construction is estimated to result in a short-term consumption of energy, representing a small demand on local and regional fuel supplies that would be easily accommodated and would be temporary. The project would not result in an inefficient, wasteful, and unnecessary consumption of energy; therefore, the impact on energy would be less than significant. b) No Impact. The project would not conflict with or obstruct a State or local plan for renewable energy, and no impact would occur.
Documentation:
City of Redding. 2000. City of Redding General Plan, Natural Resources Element. City of Redding. 2000. City of Redding General Plan, Public Facilities and Services Element. California Public Utilities Commission. 2011. California Long-Term Energy Efficiency Strategic Plan.
Mitigation:
None necessary.
GEOLOGY AND SOILS
VI. GEOLOGY AND SOILS: Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact No Impact
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake, fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning
Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publications 42.
X
Packet Pg. 209 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 21
October 2022
VI. GEOLOGY AND SOILS: Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact No Impact
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including liquefaction? iv) Landslides?
b) Result in substantial soil erosion or the loss of topsoil? X c) Be located on a geologic unit or soil that is unstable, or that would becomeunstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
X
d) Be located on expansive soil, as defined in Table 18-1-B of the UniformBuilding Code (1994), creating substantial risks to life or property?
X
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste water?
X
f) Directly or indirectly destroy a unique paleontological resource or unique geological feature?
X
Discussion:
a, c, d)No Impact. The project would not expose people or structures to potential substantial adverse effects, including risk of loss, injury, or death involving rupture of a known fault, strong seismic groundshaking, seismic-related ground failure, or landslides. The project is not located within an Alquist Priolo Earthquake Fault Zone.
Landslides usually occur in locations with steep slopes and unstable soils. According to the California Department of Conservation California Geological Survey Seismic Hazards Zonation Program (CDC 2020), the Project area is not within a known area of landslide concern. All four project areas are situated on flat or very gently sloping topography where the potential for slope failure is low. The project would also have no impact related to seismic-related failure, including liquefaction, because the potential is low at these predominantly flat, low-seismicity sites. Design and construction in accordance with California Department of Transportation’s seismic design criteria would ensure that substantial impacts due to seismic forces and displacements are avoided or minimized to the extent feasible. The project is not on a geologic unit or soil that is unstable and would not become unstable as a result of the project. On- or offsite landslide, lateral spreading, subsidence, liquefaction, or collapse is not anticipated. Therefore, the project would result in no impact.
b) Less than Significant Impact. The purpose of the project is to regrade and restore trails previously damaged by storm events. Layers of topsoil may be removed during construction; however, implementation of standard construction BMPs and an ESCP for sediment and erosion control would minimize the potential for erosion. Ground disturbance for construction access could result in a small amount of soil erosion or loss of topsoil; however, it would not result in substantial erosion or soil loss, and the impact would be less than significant. By following these erosion control plans and BMPs, the project would result in a less than significant impact. e) No Impact. The project would not use septic tanks or an alternative wastewater disposal system on the site. Therefore, the project would have no impact caused by soils incapable of adequately supporting septic systems.
Packet Pg. 210 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study
October 2022
f) No Impact. No unique geologic features, fossil-bearing strata, or paleontological sites are known to exist on the project site. Therefore, there would be no impact.
Documentation:
City of Redding. 2000. City of Redding General Plan, Health and Safety Element Figures 4-1 (Ground Shaking Potential) and 4-2 (Liquefaction Potential). California Department of Conservation (CDC). 2020. California Geological Survey Seismic Hazards Zonation Program. Accessed November 2021. https://www.conservation.ca.gov/cgs/shp. Natural Resources Conservation Service. 2018. Web Soil Survey. Shasta County Area, California.
Accessed March 30, 2021. http://websoilsurvey.nrcs.usda.gov/app/.
Mitigation:
None necessary.
GREENHOUSE GAS EMISSIONS
VII. GREENHOUSE GAS EMISSIONS: Would the project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
X
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? X
Discussion:
a) Less than Significant Impact. The primary generators of greenhouse gas (GHG) emissions in the United States are electricity generation and transportation. The U.S. Environmental Protection Agency estimates that nearly 85 percent of the nation’s GHG emissions are composed of CO2. Most CO2 emissions are generated by petroleum consumption associated with transportation and coal consumption, which is in turn associated with electricity generation. The remaining emissions are predominately the result of natural-gas consumption associated with a variety of uses.
For the proposed project, the predominant associated GHG is CO2 temporarily generated by construction vehicle travel to and from the site. CARB has recommended the use of 10,000 metric tons of carbon dioxide equivalent per year (mtCO2-e/yr) as the minimum gas emission threshold in its Climate Change Scoping Plan (approved January 9, 2009, updated May 22, 2014). According to the California Air Pollution Control Officer’s Association, the 10,000 mtCO2-e/yr is equivalent to 550 dwelling units, 400,000 square feet of office use, 120,000 square feet of retail, or 70,000 square feet of supermarket use. Given the scope and nature of the proposed project compared to that of similar projects, emissions from the project would be significantly below the thresholds put forth by CARB, as well as the City’s air quality thresholds. Therefore, the project would not contribute significantly to GHG emissions in the air basin. Additionally, the City and State’s construction standards and BMPs, including AQ-1 through -5 (listed in Section III, Air Quality), would be used during construction to further limit any potential contribution to negative impacts from GHG emissions. The project would have no direct or indirect impact on measurable GHGs in the Redding area. b) No Impact. The project would not conflict with any applicable plans, policies, or regulations adopted to reduce GHG emissions. As noted in “a” above, and in Section III, the project is in conformance with the City’s air quality policies and thresholds, and with State guidelines and regulations, and mitigation measures and BMPs AQ-1 through AQ-5 listed in Section III, Air Quality. The proposed Packet Pg. 211 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study Flood Damage Repair Project Page 23
October 2022
project would have no impact on any applicable plans, policies, or regulations related to GHG emissions.
Documentation:
City of Redding. 2000. City of Redding General Plan, Natural Resources Element. URBEMIS. 2007. Air Quality Computer Model. Version 9.2.4. City of Redding. 2000. City of Redding General Plan, Air Quality Element. California Air Pollution Control Officer’s Association. 2010. Website. Accessed November 2021. California Office of the Attorney General. 2010. The California Environmental Quality Act Addressing Global Warming Impacts at the Local Agency Level. Updated January 6, 2010. Shasta County. 2004. Shasta County General Plan. Chapter 6, Section 6.3 “Minerals.” Shasta County Department of Resource Management.
Mitigation:
None necessary.
HAZARDS AND HAZARDOUS MATERIALS
VIII. HAZARDS AND HAZARDOUS MATERIALS: Would the
project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
X
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the
environment?
X
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
X
d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code
Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
X
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? X
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
X
g) Expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas, or where residences are intermixed with wildlands?
X
Packet Pg. 212 Attachment: Mitigated Negative Declaration (4.11(d)--Approval of the Flood Damage Repair Project) City of Redding
Public Works Department, Engineering Division Initial Study