State of California
Department of Water Resources
California Code of Regulations, Title 23. Waters
Division 2. Department of Water Resources
Chapter 2.7. Model Water Efficient Landscape Ordinance
Sections 490 — 495 and Appendices A, B, C, and D

FINAL STATEMENT OF REASONS
Update of Initial Statement of Reasons
After careful consideration of the comments received and further review of the proposed regulations’ text, modifications to the text of the regulations that were published on November 17, 2023, were revised based on comments received and proposed on March 18, 2024, for a 15-day comment period, and subsequently revised and proposed on August 23, 2024, for a second 15-day public comment period. All modifications from the initial proposed text of the regulations, including non-substantial changes, are summarized below. A “non-substantial change” is one that clarifies without materially altering the requirements, rights, responsibilities, conditions or prescriptions contained in the original text.

There have been no changes in the laws affecting the MWELO regulations since the ISOR was published.

Changes Made to Section 490. Purpose
Section 490(b). The text “Model Water Efficient Landscape Ordinance (hereinafter referred to as, “MWELO” or “model ordinance” for purposes of this Chapter 2.7)” is added to provide clarity that there are several different terms used in the Chapter to refer to the Model Water Efficient Landscape Ordinance. Where the ‘ordinance’term specific to the MWELO is present throughout Chapter 2.7 and its appendices it has been updated to either be “MWELO” or “model ordinance”. This is a non-substantial change.

Section 490(b)(7). The text “that is at least as efficient as MWELO” is added to clarify the requirements of a local landscape ordinance. Per Water Code section 65595(c)(1), the local ordinance is required to be at least as efficient as MWELO. This is a non-substantial change and does not change existing 2015 MWELO requirements.

Packet Pg. 406 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 2 of 19 ends

Changes Made to Section 490.1. General Provisions
Section 490.1(a). The language is revised to enhance clarity and better describe the purpose of MWELO’s General Provisions. Previously the text stated that the General Provisions should be reviewed for applicability and did not clearly describe the requirements. The General Provisions are an organized list of generally applicable requirements for all MWELO projects that should be reviewed for applicability by both the local agency and project applicant. The text “defined in Section 491” is replaced with “described in Section 491” to improve clarity and understanding because the definitions are in Section 490.2, while landscape projects are described in Section 491. Sections 490.1.(a)(3) and (4) are related statutes for recycled water and greywater use requirements and are unique to MWELO in that they may or may not apply to the landscape project and should be reviewed by the local agency and project applicant to determine applicability.

These are non-substantial changes.

Section 490.1(a)(3)(A). To improve clarity and comprehension, the California codes relevant to recycled water use and irrigation system requirements have been consolidated from Sections 490.1(a)(3)(A) and (C), into 490.1(a)(3)(A), ensuring that all pertinent requirements are reviewed by the local agency and project applicant. This is a nonsubstantial change.

Section 490.1(a)(3)(C). In renumbered subheading (C) the text “Cal. Code Regs., Title 24, Part 5, Chapter 15” is added so that the referenced codes are consistently cited in the MWELO using Title / Division / Chapter; recycled water uses ‘Part’ instead of ‘Division’. The text “with all” is included in front of “applicable local and State laws” for consistency with 2015 MWELO Section 492.14(b), which states “All recycled water irrigation systems shall be designed and operated in accordance with all applicable local and State laws.” The text “with all” was an unintentional omission from the draft amendments. These are nonsubstantial changes.

Section 490.1(a)(3)(D). The term “Landscape areas” replaces “Landscapes” for consistency with the definitions in Section 490.2. Additionally, “as defined in 490.2(a)(80)” is added to reference and clarify that recycled water is a special landscape area as described in the definitions. This is a non-substantial change.

Section 490.1(a)(4)(B). The text “treated or untreated” in front of gray water is deleted because it is redundant. This is a non-substantial change.

Section 490.1(a)(5)(F). The text "storm water projects" is changed to "landscape projects" for consistency with the MWELO definitions. ‘Storm water projects’ is a vague and Packet Pg. 407 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 3 of 19 ends

undefined term while landscape projects are defined in Section 490.2(a)(44). This clarification improves MWELO’s understanding and is a non-substantial change.

Section 490.1(a)(6)(B). Replaced the text “requires” with “describes the requirements for” to clarify that the Public Resource Code describes requirements. Public Resource Code Section 4291(a) describes the requirements for those with authority to manage the landscape, while Section 4291(b) describes requirements for a person without the legal right to manage the property. This is a substantial change.

Section 490.1(a)(6)(C). Added “per Public Resources Code Section 4291(a) and (b)” to clarify where these requirements are located. This is a substantial change.

Section 490.1(a)(7)(A). Subheading (A) is added with the text “Any plant may be selected for the landscape project provided that the requirements of the selected compliance option are met” to clarify that any plant may be selected if it meets the requirements of the selected compliance option. This is an existing allowance per previous 2015 MWELO Section 492.6(a)(1)(A). This is a non-substantial change.

Section 490.1(a)(8). The term “condominium projects” is updated to align with statutory language in Civil Code Section 4100. This is a non-substantial change.

Section 490.1 Notes. In the Notes, the reference to Sections 1351 through 4100, and 4735 of Civil Code, and Sections 4291, 21080, and 21082 of the Public Resources Code are deleted because while these are cross-referenced regulations, DWR does not have authority to further implement these statute(s) and they should not be cited as a reference.

This is a non-substantial change.

Changes Made to Section 490.2. Definitions
Section 490.2(a)(2). The definition added in the initial MWELO amendments, 60-day notice, for “aggregated landscape projects” is deleted because it creates inconsistent terminologies and caused confusion as noted in the public comments received. This is a substantial and sufficiently related change that was noticed in the 15-day comment period beginning on March 18, 2024.

Section 490.2(a)(2) through 490.2(a)(92). Because the definition of “aggregated landscape projects” was deleted from 490.2(a)(2), subsequent definitions from 490.2(a)(2) through 490.2(a)(92) were renumbered to be in chronological order. Throughout the amendments where the definitions sections are referenced the corresponding definition numbers were updated. These are non-substantial changes.

Packet Pg. 408 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 4 of 19 ends

Section 490.2(a)(4). The text "For the purposes of this model ordinance," was added to the definition of automatic irrigation controllers to acknowledge that many automatic irrigation controllers are not capable of including evapotranspiration (ET) or moisture sensor adjusting. The requirement in MWELO is for automatic irrigation controllers to use sensor data to adjust the irrigation schedule per the 2015 MWELO, Section 492.7.(a)(1)(B) and Appendix D(b)(5)(B) and this requirement is specific to the MWELO. This is a nonsubstantial change.

Section 490.2(a)(5). The text “(Title 24, Part 5, Chapter 6)” was added to the backflow prevention device definition to specify that the California Plumbing Code section governs this requirement and for consistency in the MWELO with how other codes are referenced.

This is a non-substantial change.

Section 490.2(a)(7). Added “herein incorporated by reference” for the USEPA WaterSense Certification Program, July 2014 to clarify that these requirements are national standards incorporated by reference into the ordinance. The text “including the Irrigation Association’s Certified Landscape Irrigation Auditor program” is deleted because the Irrigation Association program is one of four programs recognized and labeled by the USEPA WaterSense Certification program. Any one of the four recognized programs is allowed and specifically identifying this program can create confusion. This is a substantial change.

Section 490.2(a)(12). The definition of dedicated irrigation meter was changed from “an inline metering device installed by the local water purveyor at the irrigation supply point that records the volume of water used” to “a customer service meter dedicated to landscape use provided by the local water purveyor.” The definition of a dedicated irrigation meter is from the 2015 MWELO Section 492.7(a)(1)(A). This is a non-substantial change.

Section 490.2(a)(14). The amendments were modified so that the referenced codes are consistently cited using Title / Division / Chapter. Added “person” to definition of designer of record for consistency with Division 3, Chapter 3.5, Article 3 of the Business and Professions Code. The Business and Professions Code is different and uses Division / Chapter / Article; the section numbers and descriptions were deleted. This is a nonsubstantial change.

Section 490.2(a)(30). The definition of “friable” modifies the text “planting material requirements” is replaced with “planting instructions for the plant material” to clarify that the previously used word ‘requirement’ is intended to describe the general instructions about how deep and wide a plant should be placed in the ground to account for the Packet Pg. 409 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 5 of 19 ends

diversity of various plants and is not meant as a specific requirement. This is a nonsubstantial change.

Section 490.2(a)(31). Added a cross-reference in the definition of Fuel Modification Plan Guideline to Section 490.1.(a)(6) to clarify where the fire safe landscape requirements are described in MWELO. This is a non-substantial change.

Section 490.2(a)(32). The definition of gray water is corrected to duplicate the exact language from Health and Safety Code Section 17922.12 by deleting “but is not limited to”.

This is a non-substantial change.

Section 490.2(a)(41). In the landscape area definition, the term “planting” replaces “landscape” to use consistent terminology. The first sentence describes the area as “irrigated planting area”; using ‘planting area’ improves clarity and understanding by not using the term "landscape area” for its own definition. In addition, a run-on sentence was corrected by deleting the text “and” and creating a separate sentence to define that the landscape area is the sum of regular landscape areas and special landscape areas. These are non-substantial changes.

Section 490.2(a)(42). Corrected the reference for the Landscape Documentation Package to the appropriate Section 491.4, and not Section 493. This is a non-substantial change.

Section 490.2(a)(43). In the definition of landscape project, a reference to the landscape definition is included, Section 490.2(a)(41). This is a non-substantial change.

Section 490.2(a)(49). In the matched precipitation rate definition, the phrase “similar precipitation rate” replaced “same volume” because it incorrectly defined ‘matched precipitation rate’. Matched precipitation rate is the comparison of the flow and the area where the flow is being distributed, typically described as a rate of inches per hour. Within the same hydrozone it is common for individual emission devices to have different flow rates to achieve similar application rates or “matched precipitation” to the area of application. This is a non-substantial change.

Section 490.2(a)(53). The text “or inorganic mineral materials such as rocks, gravel, or decomposed granite left loose and” is moved to become a new sentence at the end of the mulch definition. This text was associated with the description of organic mulch materials and “beneficial purposes of reducing evaporation, suppressing weeds, moderating soil temperature, and preventing soil erosion.” This description is partially true. The Department has received many comments from local agencies about Fire Marshalls not allowing organic mulch. If the Fire Marshall does not allow the use of organic mulch, then rock, gravel, and decomposed granite left loose is all that is available to use as mulch. The text was moved to the last sentence and now states “Mulch also includes inorganic mineral Packet Pg. 410 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 6 of 19 ends

materials such as rocks, gravel, or decomposed granite left loose (i.e. may be used for Fire Safe Landscaping).” This is a non-substantial change.

Section 490.2(a)(55). In the definition of new construction, the reference to “per Section 491” was deleted. Section 491 is Applicability and includes when the MWELO applies to:
new construction projects, rehabilitated landscape projects, existing non-rehabilitated landscapes, cemeteries, and landscapes excluded from the MWELO. The reference to Section 491 is confusing and unnecessary. This is a non-substantial change.

Section 490.2(a)(64)(A). Replaced the text “0 to 0.1” with “less than 0.1” to be consistent with how very low water use plants are described in the Water Use Classification of Landscape Species "WUCOLS" database. WUCOLS is used for the MWELO plant factors.

WUCOLS uses "Categories of Water Needs", which is similar to plant factors, and from page 8 of 18 in the WUCOLS IV User Manual, lists Very Low (VL) as less than 10 percent of ETo. The plant factor associated with VL was corrected in Section 493.3.b.1.A and Appendix A to state "less than 0.1". This is a non-substantial change.

Section 490.2(a)(66). In the rain sensor definition, “interrupts” replaced “suspends” because it incorrectly describes the function of the rain sensor. The purpose of a rain sensor is to interrupt the irrigation cycle when there is rainfall providing water to the landscape. The rain sensor does not suspend the irrigation cycle because the term “suspend” implies that the irrigation cycle continues after the precipitation event. This is a non-substantial change.

Section 490.2(a)(68). The text “excluding private single-family residential landscapes” was moved to a separate sentence at the end of the definition to improve clarity and understanding. The new sentence is “Private single-family residential landscapes are not recreational areas.” This is a non-substantial change.

Section 490.2(a)(69). Clarity was added to the recycled water definition by referencing the allowable Recycled Water uses in the California Code of Regulations. The text "as described in California Code of Regulations, Title 22, Division 4, Chapter 3." clarifies that the use of recycled water is governed by the California Code of Regulations. This is a nonsubstantial change.

Section 490.2(a)(70). Clarity was added to the reference evapotranspiration definition by describing that “the annual reference” evapotranspiration is required in the maximum applied water allowance calculation. Appendix C shows reference evapotranspiration values as both an annual value and monthly values. Monthly reference ETO values are necessary for irrigation scheduling and auditing while annual values are used in the water budget calculations. This is a non-substantial change.

Packet Pg. 411 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 7 of 19 ends

Section 490.2(a)(77). Clarity was added to the soil moisture sensing device definition by describing that the device sends a signal to the automatic irrigation controller to either interrupt or initiate an irrigation event. The soil moisture sensor does not suspend or initiate an irrigation event, it sends a signal to the automatic irrigation controller which controls the irrigation events. This is a non-substantial change.

Section 490.2(a)(90). The text “to leave the target landscape area” was added to the water waste definition to be consistent with the previous description in Section 493.2(a) where it is stated, “prohibiting runoff from leaving the target landscape due to low head drainage, overspray” this was necessary to improve clarity and understanding because runoff occurs when it leaves the target area, not when it stays in the landscape area being irrigated.

Corrected poor grammar by deleting “over application” and making it one word “overapplication”, per Merriam Webster dictionary. These are non-substantial changes.

Section 490.2(a)(91). The definition of watering window was clarified to describe that the watering window refers to the “days per week and the hours per day” irrigation is allowed.

The previous definition in the draft amendments defined watering window as the time of day that irrigation is allowed. This is a non-substantial change.

Section 490.2(a)(92). Added “herein incorporated by reference” for the WUCOLS IV database and identified it as WUCOLS IV, 2014, version. This is a substantial change.

Changes Made to Section 491. Applicability
Section 491(a)(3). The added definition, “aggregated landscape projects” was deleted, and this requirement is from the 2015 MWELO Sections 492.5(a)(1)(C) and 492.12(b) and the original language is kept with those moved sections in the amendments. The 2015 MWELO language with allowances for multiple landscape installations described in the 2015 MWELO Section 492.5(a)(1)(C) are kept with the soil management report in the amended Section 493.1. Soil Management Report. The 2015 MWELO language with allowances for large projects or projects with multiple landscape installations described in the 2015 MWELO Section 492.12(b) are kept with the Irrigation Audit in the amended Section 493.6.

Because the new definition for “aggregated landscape projects” was deleted; the previous numbering in the draft regelation text of 491(a)(4) and 491(a)(5) are correct to be numbered in chronological order. This is a substantial and sufficiently related change that was noticed in the 15-day comment period that began on March 18, 2024.

Section 491(a)(3). The term “non-rehabilitated” was added to “existing non-rehabilitated landscapes” for consistency when referring to these types of projects. This is now consistent with 2015 MWELO Section 491(s) as defined in “ET adjustment factor” and is a non-substantial change.

Packet Pg. 412 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 8 of 19 ends

Changes Made to Section 491.2. Provisions for New Construction or Rehabilitated Landscapes
Section 491.2(a)(1) and Section 491.2(a)(2). The prescriptive compliance option in Section 491.2(a)(1) and the performance compliance option in Section 491.2(a)(2) incorrectly referenced the applicable sections and were corrected. These are existing 2015 MWELO requirements. These references were included to reduce ambiguity and improve clarity and understanding. This is a non-substantial change.

Section 491.2(b). The text “any new construction project with a landscape area between 500 and 2,500 square feet” was moved from the beginning to the end of the sentence to improve grammar and clarity. This is a non-substantial change.

Section 491.2(c). The text “An applicant shall use the performance compliance option for any” was added for consistency with Section 491.2(b) and to reduce ambiguity about who is required to implement MWELO and does not change existing MWELO requirements.

Section 491.2(b)(1) and Section 491.2(c)(1). The provisions for aggregated landscape projects were moved to be subheadings underneath Section 491.2(b)(1) new construction projects and Section 491(c)(1) rehabilitated landscape projects to clarify that provisions for aggregated landscapes, which have allowances for soil sampling and irrigation audits, applies to these project types. This is a substantial and sufficiently related change that was noticed in the 15-day comment period that began on March 18, 2024.

Changes Made to Section 491.3. Compliance Responsibilities Section 491.3(a). The designation of responsibility, in previous Section 492 and now in renumbered Section 490.1(a)(1) was duplicated in Section 491.3(a) to reduce ambiguity and improve clarity that the MWELO compliance responsibilities can be designated with either the local water purveyor or another agency. Previously, the designation of responsibility was only described in the General Provisions section. The subsections beneath are re-lettered in chronological order following the insertion of Section 491.3(a).

This is a non-substantial change.

Section 491.3(b)(1)(E). The text “For the performance compliance option only, upon approval of the Landscape Documentation Package, the local agency shall submit a copy of the Water Efficient Landscape Worksheet to the local water purveyor” was moved from Section 491.3(b)(2) to Section 491.3(b)(1)(E) because it was incorrectly organized as section (2) instead of being correctly associated with the requirements prior to construction. The 2015 MWELO Section 492.1(b) shows the correct organization of this Packet Pg. 413 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 9 of 19 ends

requirement. The subheadings following were renumbered to be in chronological order.

This is a non-substantial change.

Section 491.3(c)(2)(A). The text “dedicated irrigation meter or” was added in front of ‘private submeter’to acknowledge that non-residential projects greater than 1,000 square feet may use a dedicated irrigation meter to measure landscape water use. This does not change existing MWELO requirements and is a non-substantial change.

Section 491.3(c)(2)(B). In the MWELO amendments, the text “along with the record drawings, and any other information” was mistakenly omitted; it was included in Section 491.3(c)(2)(B) and is an existing 2015 MWELO requirement, Section 492.1(c)(2). The landscape documentation package submitted by the local agency to the local water purveyor may be different than the actual landscape installed and should be included on the record drawings of the landscape documentation package produced by the project applicant. Improved clarity by adding the text “unless the property owner is the project applicant” to acknowledge that if the property owner is also the project applicant, then the landscape documentation package does not need to be submitted to themselves. These are non-substantial changes.

Section 491.4(a)(1)(A). Added clarifying text to the word “date” by including “the project information sheet is completed” to clarify what date should be used. This is a nonsubstantial change.

Section 491.4(b)(1)(A). Added clarifying text to the word “date” by including “the project information sheet is completed” to clarify what date should be used. This is a nonsubstantial change.

Changes Made to Section 492. Prescriptive Compliance Option Section 492(c)(1). In the amendments, “(unless contra-indicated by a soil test)” was mistakenly omitted from the reorganization of the 2015 MWELO requirements. It is included in Section 492(c)(1) and is a non-substantial change.

Section 492(c)(2)(F). Added “which is herein incorporated by reference” for the 20220 ASABE/ICC 802 Landscape Irrigation Sprinkler and Emitter Standard. This is a substantial change.

Following the second 15-day public notice, the text was re-written to improve clarity and is a non-substantial change. The text was modified from “requirements set in the ANSI standard, ASABE/ICC 802-2020, which is herein incorporated by reference. ‘Landscape Irrigation Sprinkler and Emitter Standard,’to the text: “requirements set by ANSI in the 2020 Packet Pg. 414 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 10 of 19 ends

ASABE/ICC 802 Landscape Irrigation Sprinkler and Emitter Standard, which is herein incorporated by reference.”
Section 492(c)(2)(G). The amendments were modified so that the referenced codes are consistently cited using Title / Division / Chapter. Section was also included in the reference because it is difficult to find without the reference. Text was revised to state “Non-rotating spray sprinkler bodies are required to meet the standards described in California Code of Regulations, Title 20, Division 4, Chapter 4, Section 1605.3(x).” This is a non-substantial change.

Section 492(d). The text of the regulation was modified to describe that the designer of record shall make plants identifiable during final inspection and does not specify how that should be done. Plants must be identifiable by botanical name, common name or cultivar as identified in the Food and Agricultural Code. The initial 60-day amendments required using a plant legend with photographs, which was deleted to allow the designer of record more flexibility to comply with Government Code Section 65596(n). The amendments were modified so that referenced codes are consistently cited using Title / Division / Chapter; the Food and Agriculture Code uses Division / Chapter / Article, the section number was deleted. Section 492(e) was moved to Section 492(d) to improve organization and understanding. This is a substantial and sufficiently related change that was noticed in the 15-day comment period that began on March 18, 2024. The text “Division 18, Chapter 5, Article 7” was deleted and “Section 53481” was added to clearly explain where in the Food and Agricultural Code it describes how plants are identified.

Section 492(e). The draft regulatory text moved Section 492(d) to 492(e) to improve organization and understanding of requirements. This is a non-substantial change.

Changes Made to Section 493. Performance Compliance Option Section 493. The text “and documented in the Landscape Documentation Package, Section 491.4(b), and the Certificate of Completion Package, as described in Section 494(b).” was added to the MWELO amendments in Section 493 to reduce ambiguity and improve clarity and understanding about required documents for the performance compliance option and includes section references.

Changes Made to Section 493.1. Soil Management Report
Section 493.1(a)(1)(C)
The text “aggregated” was deleted because the definition for “aggregated landscape project” was deleted. The amendments were changed to be consistent with the 2015 MWELO Section 492.5(a)(1)(C) and includes the language “with multiple landscape Packet Pg. 415 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 11 of 19 ends

installations (i.e. production home developments)”. The term “individual” was deleted because it did not improve clarity. This is a substantial and sufficiently related change that was noticed in the 15-day comment period ending on April 3, 2024.

Section 493.1(a)(1)(C).1. The last sentence of previous section 492.5(a)(1)(C) states “Large landscape projects shall sample at a rate equivalent to 1 in 7 lots.” and was made a separate subheading in Section 493.1(a)(1)(C) to reduce ambiguity and improve clarity.

This does not change any existing requirement. This is a substantial and sufficiently related change that was noticed in the 15-day comment period ending on April 3, 2024.

Changes Made to Section 493.2. Landscape Design Plan
Section 493.2(a)(2)(A). The text “specified in Section 493.3(b)(1) is added to crossreference the plant factor ranges. This is a non-substantial change.

Section 493.2(a)(12). The text “Designated insect habitat must be identified in the landscape plan” was changed to “Identify designated insect habitat” to improve clarity.

This is a non-substantial change.

Section 493.2(a)(12). The text of the regulation was modified to describe that the designer of record shall make plants identifiable during final inspection and does not specify how that should be done. Plants must be identifiable by botanical name, common name or cultivar as identified in the Food and Agricultural Code. The initial 60-day amendments required using a plant legend with photographs, which was deleted to allow the designer of record more flexibility to comply with Government Code Section 65596(n). The amendments were modified so that referenced codes are consistently cited using Title / Division / Chapter; the Food and Agriculture Code uses Division / Chapter / Article, the section number was deleted. This is a substantial and sufficiently related change that was noticed in the 15-day comment period ending on April 3, 2024.

Section 493.2(a)(13). The text “performance compliance option” was added before the Landscape Design Plan criteria to reduce ambiguity. This is a non-substantial change.

Section 493.2(a)(14). The amendments were modified so that the referenced codes are consistently cited using Title / Division / Chapter; the Business and Professions Code uses Division / Chapter / Article, and the section numbers were deleted. Simplified the Designer of Record by referencing its definition in Section 490.2(a)(14). This is a non-substantial change.

Section 493.2(b)(7)(A). Added “which is herein incorporated by reference” for the 2007 Sunset Western Climate Zone System. This is a substantial change.

Packet Pg. 416 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 12 of 19 ends

Section 493.2(c)(4). Removed the reference of Division / Part / Chapter and included “subdivision (d) of Section 115921” to improve clarity to the pool cover requirement statute. This is a non-substantial change.

Section 493.2(d)(7) and Section 493.2(d)(7)(A). The text “Organic mulches are not required where prohibited by local Fuel Modification Plan Guidelines or other applicable local ordinances. (Public Resources Code Section 4291)” was moved from Section 493.2(d)(7) to Section 493.2(d)(7)(A) to improve the organization and understanding of the mulching requirements. The duplicated text is deleted: “Organic mulch materials made from recycled or post-consumer shall take precedence over inorganic materials or virgin forest products unless the recycled post-consumer organic products are not locally available.” This is a non-substantial change.

Changes Made to Section 493.2.1 Grading Design Plan
Section 493.2.1(a). Business and Professions Code (BPC) Section 5615 allows unlicensed both personal property owners to develop grading plans as well as licensed professionals.

The initial amendments limited grading plans to only being submitted only by a licensed civil engineer, which is inconsistent with allowable practices governed by the BPC. The draft regulation was updated to state: “A comprehensive grading plan approved by the local agency for other local agency permits satisfies this requirement.” Grading plans are required to be approved by the local agency outside of MWELO. MWELO does not need to specify who is allowed to prepare other documents because these requirements are governed by other codes, not MWELO. This is a non-substantial change.

Section 493.2.1(a)(3). The text “performance compliance option” was added before criteria to the Landscape Design Plan to reduce ambiguity and improve clarity. This is a non-substantial change.

Changes Made to Section 493.2.2. Irrigation Design Plan Section 493.2.2(b)(1). The section incorrectly referenced the wrong section, previously Section 493.5, for applying irrigation efficiency criteria which is described in Section 493.3.

This is a non-substantial change.

Section 493.2.2(b)(1)(A). The text “0 to 0.1” replaced “less than 0.1” for consistency with the description and classification of very low water use plants with the Water Use Classification of Landscape Species "WUCOLS" database. The WUCOLS is used as the citation for MWELO plant factors and uses "Categories of Water Needs", which is used interchangeably with plant factors. In the WUCOLS IV User Manual (pg.8), Very Low (VL) is described as less than 10 percent of ETo. The plant factor associated with VL is corrected in Packet Pg. 417 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 13 of 19 ends

Section 493.3.b.1.A and Appendix A to state "less than 0.1". This is a non-substantial change.

Section 493.2.2(c)(1). The text “the following” was added to the end of “shall contain the following:” to improve clarity. This is a non-substantial change.

Section 493.2.2(c)(1). The text “and submeters” was added to provide clarity and understanding that all meters including submeters, a type of meter, should be identified on the irrigation design plan. This does not change the existing 2015 MWELO requirement to identify the location and size of separate water meters. This is a non-substantial change.

Section 493.2.2(c)(4). The amendments were modified so that the referenced codes are consistently cited using Title / Division / Chapter; the Health and Safety Code uses Division / Part / Chapter / Article, and the section numbers were deleted. This is a non-substantial change.

Section 493.2.2(c)(5) and 493.2.2(c)(6). The text “identify” is replaced with “identification of”, this is a non-substantial change.

Section 493.2.2(c)(7). The text “On the irrigation design plan” is replaced with “identification of” because it is redundant text describing the irrigation plan requirements.

This is a non-substantial change.

Section 493.2.2(c)(8). The text “performance compliance option” was added to improve clarity and reduce ambiguity. This is a non-substantial change.

Section 493.2.2(c)(9). The amendments were modified so that referenced codes are consistently cited using Title / Division / Chapter; the Business and Professions Code uses Division / Chapter / Article, and the section numbers were deleted. This is a nonsubstantial change.

Section 493.2.2(d)(10)(A). The draft regulatory text “the landscape area is adjacent to pervious surfacing and” was deleted because it is redundant with the requirement in Section 493.2.2(d)(10) that states “Overhead irrigation shall not be permitted within 24 inches of any non-pervious surface.” The text regarding “no runoff occurs” was left because it requires no runoff to allow the restrictions to be modified. Section 490.1(a)(2) requires local agencies to prevent water waste from inefficient landscape irrigation.

Section 493.2.2(d)(11). The text regarding overspray and runoff restrictions was unintentionally omitted in the amendments and is from 2015 MWELO Sections 493.2(b)(1) and 493.2(b)(2), which allows the restrictions regarding overspray and runoff to be modified if requirements are met. This is a non-substantial change.

Packet Pg. 418 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 14 of 19 ends

Section 493.2.2(d)(12) and Section 493.2.2(d)(13). The section numberings were corrected following the corrected oversight of missing Section 493.2.2(d)(11). This is a nonsubstantial change.

Section 493.2.2(e)(1)(A). The text “with 15 or more service connections” was added for consistency with the description in Water Code Section 535. This is a non-substantial change.

Section 493.2.2(e)(1)(B)1. The text “but not more than 5,000 sq. ft.” was included with nonresidential landscapes because it is in the 2015 MWELO, Section 492.7(a)(1)(A) and should have been included in the amended MWELO text. When the irrigated landscape is greater than 5,000 sq. ft. Water Code Section 535 applies as described in the revised Section 493.2.2(e)(1)(A). This is a non-substantial change.

Section 493.2.2(e)(2)(C). The text “range” was added after the “recommended pressure” to clarify that there is an optimal range of pressure acceptable for emission devices and not just a single pressure measurement. This is a non-substantial change.

Section 493.2.2(e)(4)(C). The draft regulatory text was modified to reduce ambiguity and provide clarity by referencing the California Code of Regulations for standards on nonrotating spray sprinkler bodies. This is a non-substantial change.

Changes Made to Section 493.3. Water Efficient Landscape Worksheet Section 493.3.(a)(3) The CIMIS Reference Evapotranspiration map, 1999, now includes the language, “which is herein incorporated by reference.” This is a substantial change.

Changes Made to Section 493.4. Irrigation Scheduling
Section 493.4(a)(5)(B). The text “meets” was replaced with “does not exceed” to be consistent with the definitions of the Maximum Applied Water Allowance (MAWA) and Estimated Total Water Use (ETWU) in the MWELO. Per Appendix A “The ETWU (gallons per year) must be equal to or less than the MAWA (annual gallows allowed) to comply with MWELO.” This is a non-substantial change.

Changes Made to Section 493.6. Irrigation Audit
Section 493.6(b). The text “aggregated” was replaced with “large” in front of landscape projects; “or landscape projects with multiple landscape installations” was added because the introduced definition for “aggregated landscape project” was deleted. This is consistent with the 2015 MWELO Section 492.12(b) and does not change existing MWELO requirements. This is a substantial and sufficiently related change that was noticed in the 15-day comment period ending on April 3, 2024.

Packet Pg. 419 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 15 of 19 ends

Section 493.6(c). The reference to Section 491 was corrected from “Section 491” to reference “Section 493” because irrigation audits are specific to the performance compliance option requirements. The 2015 MWELO Appendix D prescriptive compliance option does not require an irrigation audit. This is a non-substantial change.

Changes Made to Section 494. Certificate of Completion Package Section 494. This language is added from Appendix B and is an existing requirement: "The Certificate of Completion Package is completed by the project applicant or their designee to certify that the landscape project has been installed in accordance with the Model Water Efficient Landscape Ordinance." This is a non-substantial change.

Section 494(b)(1)(A). Added clarifying text to the word “date” by including “the project information sheet is completed” to clarify what date should be used. This is a nonsubstantial change.

Changes Made to Section 495. Reporting
Section 495(a). The 60-day comment period included both Section 495(a) and 495(b) to describe the same requirement, which created confusion if it was one report or two separate reports that were required. Section 495(a) was combined with Section 495(b) to improve clarity and understanding about local agency reporting including who the reports are submitted to, when they are submitted, and for what reporting period. This reduces ambiguity and clarifies that only one report is required to be submitted to DWR. This is a non-substantial change.

Following the second 15-day public comment period, Section 495(a)(3) was included with Section 495(a) to reduce ambiguity, and clarify for local agencies the reporting requirements, which includes who reports are submitted to, when they need to be submitted, and for what reporting period. Local agencies are required to report on MWELO implementation and enforcement; the additional clarification of “Local agencies shall report” is a non-substantial change to improve clarity and understanding. These are nonsubstantial changes.

Section 495(a)(2). The local agency reporting requirements for the calendar year are moved into Section 495(a) to improve clarity. This section is not a question that needs to be addressed by the local agency. The subsequent Section numbering was updated following this edit. This was changed after the second 15-day notice and are nonsubstantial changes.

Section 495(a)(3). The text “describe” is added to clarify what is being asked of local agency’s when reporting on a local WELO. This is a non-substantial change.

Packet Pg. 420 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 16 of 19 ends

Section 495(a)(5). This section was moved from Section 495(a)(7) to Section 495(a)(5) to improve organization, clarity and understanding. The reporting questions were reorganized such that the questions have a chronological order: Section 495(a)(5), number of new construction projects; Section 495(a)(6), number of completed projects by project type; and Section 495(a)(7), total landscape area. In the amendments Section 495(b)(7) asked for “new housing starts, new commercial projects, and landscape retrofits during the reporting period.”, which is inconsistent with the MWELO definitions of project types. By listing the project types in (A) through (D) what is required to be reported is clarified. This is a non-substantial change.

Section 495(a)(6). This section was moved from Section 495(a)(5) to Section 495(a)(6) so that the questions have a chronological order in how they are asked; please reference the reason above for Section 495(a)(5). This is a non-substantial change.

Changes Made to Appendix A. Sample Water Efficient Landscape Worksheet
The text “the” and “or their designee” were added to improve grammar. The typo “gallows” was corrected to read "gallons". This is a non-substantial change.

Changes Made to Appendix B. Sample Certificate of Completion Package Element 2. A secondary signature line was added for the designer of record to allow multiple signatures when more than one person is the designer of record. This is a nonsubstantial change.

Element 3. Section 491.4 reference was corrected to reference section 491.4(b), which includes the requirements for the Soil Management Report within the performance compliance option. This is a non-substantial change.

Changes Made to Appendix C. Reference Evapotranspiration (ETo) Table Appendix C subdivides the Reference Evapotranspiration (ETo) Table first by counties and then cities / places within that county. The county identifier for San Joaquin County was unintentionally omitted in the amendments and has been corrected. This is not a substantial change.

There are 19 pages of reference evapotranspiration values for counties/cities. Underneath the header row on each of the 19 pages the county is always shown first, followed by the cities associated with their counties. Because San Joaquin County was unintentionally omitted and has been added back in, the county identifier on the pages following were adjusted so that the county is always shown first. These edits are not a substantial change.

Packet Pg. 421 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 17 of 19 ends

In Siskiyou County, the city “MacDoel” was incorrectly capitalized and was corrected to read “Macdoel”. This is not a substantial change.

Summary of Comments and Department Responses
The Department received 189 comments during the 60-day public comment period; 24 comments were received during the 15-day comment period; and one comment letter was received following the 15-day comment period. The summary of the comments and the Department’s responses are attached as the following appendices organized in the Table of Contents associated with the public comment period in which they were received.

Appendix A. Summary and Response to Comments Submitted during 60-day Comment Period (shown in the Table of Contents as 4.6)
Appendix B. Summary and Response to Comments Submitted during first 15-day Comment Period (shown in the Table of Contents as 5.4)
Appendix C. Summary and Response to Comments Submitted following first 15-day Comment Period (shown in the Table of Contents as 6.1)
Appendix D. Summary and Response to Comments Submitted for second 15-day Comment Period (shown in the Table of Contents as 7.4)
For ease of reference, the Department assigned a number to each written and oral comment received. Because most comment letters contained multiple comments that needed to be addressed, for each comment, the Department assigned numbers to the comment submission number using MU-## for MWELO Update.

The “Summary and Response to Comments” preceding the original comments and received is organized according to the chronological order of the proposed regulations Section that they address. Comments that are generally about the regulations, but not regarding a particular section or subsection of the regulations, are grouped together at the beginning of the Summary under the heading of “General.” Subheadings have been included where comments are related to similar topics.

Local Mandate Determination
These proposed update to the MWELO regulations does not impose any new mandate on local agencies or school districts, as any impacts would result from an implementation of existing law.

Packet Pg. 422 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 18 of 19 ends

Alternatives Considered
The Department considered reasonable alternatives to the MWELO amendments and determined that no reasonable alternative would be more effective in carrying out the purpose for which the regulation is proposed, would be as effective and less burdensome to affected private persons than the adopted regulation, or would be more cost effective to affected private persons and equally effective in implementing the statutory policy or other provision of law than the amendments.

This conclusion is based on the Departments’ determination that the MWELO amendments are necessary based on two recent independently developed reports by UC Davis and the Landscape Statewide Advisory Group (LSAG) demonstrating that there is inconsistent implementation and management of the MWELO at the local level. The reports, the UC Davis Survey on Barriers to MWELO Implementation (2022) and the LSAG Summary report for Updating MWELO (August 2019), suggest that MWELO's organization and lack of clarity is a current barrier to consistent and effective implementation of the ordinance.

Recognizing the need to facilitate MWELO's implementation, the Governor's Water Resilience Portfolio (January 2022) includes Action 2.2 - Simplify the Model Water Efficient Landscape Ordinance.

In a manner consistent with existing statues and case law, the proposed amendments add no new substantive requirements. The Department rejected the no action alternative because it would not achieve the objectives of the proposed amendments, which are to simplify the MWELO by reducing ambiguities, providing clarity, and improving MWELO’s organization. There are no alternatives available that would lessen any adverse impacts on small businesses, as any impacts would result from an implementation of existing law.

Alternatives that would lessen Adverse Economic Impact
on Small Business
As described in the Economic and Fiscal Impact Assessment, Standard Form 399 and attachment, these amendments only clarify and reduce the ambiguity of MWELO and are expected to have very little to no economic impact on business, as any impacts would result from an implementation of existing law. The only new requirement with any potential impact is a provision implementing Government Code Section 65596(n), adopted in 2020, which requires all plants to be identifiable at the time of inspection. During the 60-day public comment period, DWR modified the proposed implementation of this statutory direction by requiring all plants be identifiable at the time of inspection, without directing Packet Pg. 423 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Final Statement of Reasons: Model Water Efficient Landscape Ordinance (MWELO)

Page 19 of 19 ends

how it should be performed. Thus, this new requirement will have negligible to no fiscal impact.

Incorporation by Reference
There is no change to the existing MWELO requirements; however, in the 2015 MWELO regulation external standards were cited and should have included language incorporating them by reference. This oversight is being corrected in these proposed amendments.

The documents listed below are incorporated by reference as they are too lengthy and cumbersome to be included in the CCR. The documents were included in the Initial Statement of Reasons on November 17, 2023, as part of the documents and studies relied upon. The MWELO regulation was modified by WUE in August 2024, following feedback from OAL and the proposed MWELO amendments included the language: “incorporated by reference”. These documents were made publicly available during the second 15-day comment period that ended September 9, 2024.

1. American Society of Agricultural and Biological Engineers / International Code Council (ASABE/ICC) 802 Landscape Irrigation Sprinkler and Emitter Standard (ISIEDC), 2020, available at:
https://codes.iccsafe.org/content/ICC8022020P1/american-national-standard

2. California Irrigation Management Information System (CIMIS) ETo Zone Map, 1999, available at: https://cimis.water.ca.gov/App_Themes/images/etozonemap.jpg

3. Water Use Classification of Landscape Species (WUCOLS IV), 2014, accessible at:
https://ccuh.ucdavis.edu/wucols-db

4. Sunset Western Climate Zone Maps, 2007, accessible at:
https://sunsetplantcollection.com/climate-zones/

5. US EPA WaterSense Specification for Irrigation Systems Auditor Certification Program, 2017, accessible at: https://www.epa.gov/sites/default/files/2017- 02/documents/ws-specification-irrigation-auditor-revised.pdf Nonduplication
Some of the regulations may repeat or rephrase in whole or in part a state or federal statute or regulation and do not duplicate or conflict with any federal statutes or regulations. This was necessary to satisfy the clarity standard set forth in Government Code Section 11349.1(a)(3).

Packet Pg. 424 Attachment: ^Final Statement of Reasons: MWELO (CA Dept of Water Resources) (6.1--Ordinance Amending RMC Chapter 16.70, Water Packet Pg. 425
Attachment: ^NOE Ordinance Amending RMC Title 16_Chapter 16.70 (6.1--Ordinance Amending RMC Chapter 16.70, Water Efficient Landscape)

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Accept City of Redding Electric Utility’s Fiscal Year 2024-25 Financial Report, Industry Activities Update, and Power Content Label.

Fiscal Impact
There is no fiscal impact related to accepting this report.

Alternative Action
The City Council (Council) could choose not to accept the report and provide further direction to staff.

Background/Analysis
The Fiscal Year 2024-25 Financial Report, covering the period July 1, 2024, through June 30, 2025, demonstrates that the City of Redding Electric Utility (REU), performed better than budgeted. The improved REU financial results were driven by higher-than-expected revenue.

Although power costs have increased, the impact was mitigated by continued favorable hydropower deliveries and lower natural gas commodity prices. Despite the higher expenses, net financial results outperformed budget expectations, with revenues more than offsetting the increase in costs. These results reinforce the organization’s strong financial position, providing a solid foundation for continued investment in priority programs, operational initiatives, and longterm strategic objectives.

Unrestricted reserves increased by approximately $4.6 million during the fiscal year, bringing the total to $45.2 million as of June 30, 2025.

MEETING DATE: October 21, 2025
ITEM NO. 9.5(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 9.5(a)--Consider Redding Electric Utility's Fiscal Year 2024-25 Financial Report, Industry Activities Update, and Power Sources Disclosure.

Nick Zettel, Director of
Redding Electric Utility
Packet Pg. 426
Report to Redding City Council October 14, 2025
Re: 9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report Page 2 Inventory increased by $3.7 million, representing materials expected to be used and reimbursed with bond proceeds during the current fiscal year. Additionally, $3.7 million in bond reimbursement proceeds related to expenditures through June 30, 2025, were not received until July 2025. When these timing differences are considered, the unrestricted reserve balance effectively represents approximately 20 additional days of cash on hand.

Revenue
Billed retail revenue for Fiscal Year (July 2024 through June 2025) exceeded the budget by $11,762,997 (9.0 percent), primarily due to higher customer energy use driven by weather variations. Colder-than-average temperatures in January and early February increased winter demand, while unusually hot summer conditions, particularly in June through September, further elevated consumption. Notably, Redding recorded an all-time high temperature of 119°F on July 6, 2024. Market conditions prompted additional dispatch of Redding Power Plant generation to address regional capacity constraints, contributing to wholesale sales exceeding budget by $8,791,315 (58.8 percent).

Overall, operating revenue for the year was $23,872,345 (16.1 percent) above projections. After accounting for energy costs, operating revenue was $13,653,907 (19.2 percent) higher than budgeted.

Expense
Power Cost (Cost of Energy)
The combined costs for generation, purchases from the Western Area Power Administration, Big Horn Wind Project, contracts, and the spot market were $10,218,439 (13.3 percent) above budget projections for the year. The Redding Power Plant generation cost was higher than forecast due to increased load and wholesale sales. The total Cost of Energy decreased by $4,656,419 (5.1 percent) year-over-year. The Cost of Energy for native load (Power Cost less Wholesale Sales) increased by $3,458,961 year-over-year (5.8 percent).

System Operations & Maintenance (O&M)
System O&M costs for the fiscal year were $2,341,567 (4.3 percent) above budget projections.

The variance primarily reflects higher interdepartmental costs and continued wildfire mitigation activities, with personnel-related expenditures associated with these efforts and other operations contributing to the overall increase. These costs align with the budget approved during the biennial process and do not include subsequent budget augmentations authorized during the fiscal year.

Debt Service and Capital Outlay
Debt service payments and obligations for the year totaled $14,850,385. Capital Expenditures for the year totaled $14,651,637 (61.7 percent spent). The pace of capital projects and expenditures has increased somewhat compared to prior periods. While some supply chain pressures have eased, longer lead times, higher shipping costs, tariffs and trade policies, raw material constraints, and ongoing political factors continue to influence the timing of project completion.

Packet Pg. 427
Report to Redding City Council October 14, 2025
Re: 9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report Page 3 Special Fund Expenditures
Special Fund Expenditures, which include spending for Public Benefit and Cap-and-Trade Programs, totaled $2,607,600 (representing 31.6 percent of the budget) for the fiscal year.

Electric Utility Unrestricted Cash Balance
The unrestricted cash balance at the end of the fiscal year was $45.2 million, representing approximately 123 days of cash on hand. This balance exceeds the minimum threshold of 75 days established in REU’s Financial Management Policy (Council Policy 1414) and approaches the policy’s target of 150 days of cash, indicating a strong liquidity position. As mentioned in the Background/Analysis, an additional 20 days of cash exists in current assets that will be converted to cash in fiscal year 2026 (approximately $7.4 million).

Director’s Contingency Fund
For the fiscal year, $348,100 (69.6 percent) of the REU Director’s Contingency Fund was utilized. The expenditures were primarily to address increased costs for general professional services and consulting, as well as unanticipated legal matters, managed in accordance with confidentiality requirements.

Power Source Disclosure Report
The City of Redding’s 2024 Power Content Label and Power Source Disclosure report are attached. The Power Source Disclosure report is submitted annually to the California Energy Commission under the state’s Power Source Disclosure Program and provides the data used to prepare the Power Content Label.

The Power Content Label serves as a “nutrition label” for electricity, showing customers how REU’s power is generated and how its resource mix compares to California overall. It identifies sources such as hydroelectric, solar, natural gas, and wind, along with the associated greenhouse gas emissions intensity.

State regulations require governing board approval of the Power Content Label. Once approved, staff will file it with the California Energy Commission, post it on REU’s website, and mail it to customers, as required.

Beginning in 2026, updated state regulations will shift this process from requiring City Council approval of the Power Content Label to City Council attestation of the accuracy of the annual Power Source Disclosure report.

Approval of this item will satisfy the state requirement for the 2024 Power Content Label.

Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.

Council Priority/City Manager Goals
• Budget and Financial Management – “Achieve balanced and stable 10-year Financial Plans for all funds.”
Packet Pg. 428
Report to Redding City Council October 14, 2025
Re: 9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report Page 4 Attachments
Attachment 1 - Notes on Financial Operating Statement
Attachment 2 - Electric Utility Financial Results for June 2025 Attachment 3 - Electric Utility Financial Dashboard for June 2025 Attachment 4 - Electric Utility Unrestricted Cash Balance June 2025 Attachment 5 - Electric Utility Industry Update
Attachment 6 - City of Redding 2024 Power Content Label Attachment 7 - City of Redding 2024 Power Source Disclosure Packet Pg. 429
Attachment 1
City of Redding Electric Utility
Notes to Financial Report
Notes on Financial Operating Statement
Operating revenues are divided into three revenue elements: Retail Sales are sales of electricity to end-use customers; Wholesale Sales are to customers who resell electricity; and Other Revenue, which includes the sale of services, joint-pole arrangements, interest income, and other miscellaneous revenue generated in the operations of Redding Electric Utility (REU).

Operating Expenses are divided into two expense elements: Power Cost and System O&M. Cost of Energy summarizes Purchased Power costs. The primary sources of purchased power include Western Area Power Administration deliveries and long-term contracts for Wind Energy through M-S-R. Fuel expenses, purchases from the spot market, and expenses associated with participation in the California Independent System Operator make up the remainder. The Generation and Transmission component comprises power plant variable costs (fuel) and fixed costs (all non-fuel costs), as well as all JPA costs (M-S-R and TANC), except Wind Energy.

The Wholesale Sales and Power Costs budgets are based on known contracts and confirmed resources. Throughout the year, efforts have been made to provide our ratepayers with the most cost-effective energy supply. This is often achieved by buying and selling natural gas or electricity to lower overall costs. This could include selling natural gas and replacing it with less expensive electricity rather than burning it at our power plant. It might also involve selling energy contracted at one trading hub and buying it at another, less expensive one. Additionally, we optimize the value of our gas storage facility by purchasing natural gas when prices are low and using or selling it in other months. All these transactions benefit our customers but tend to inflate the Wholesale Sales and Cost of Energy figures above their original budgets. This occurs because accounting rules require us to record these transactions at their gross revenue and expense amounts, not based on the utility's net benefit.

System O&M Expenses summarizes costs for all other functional groups, i.e., Administration, Customer Services, Engineering, Financial Services, Line, Compliance, and Resources. Special Revenue funds, i.e., Public Benefits and Cap-and-Trade, are shown separately. Debt Service is paid twice per fiscal year, once in December and again in June. Capital Outlay includes currentyear appropriations and unfinished projects approved by the Council in prior years.

This financial report provides year-to-date comparisons to the current budget and the same yearto-date results for the prior year. Operating revenues are reported as billed. Costs for energy, other operating expenses, and capital outlay are recorded when paid. For this report, debt payments are spread evenly over the year, giving a more helpful picture of the financial results. Projections are based on normal weather trends and known industry activity. If actual weather conditions are above or below average for the month or an unexpected industry disruption occurs, revenue and expenses will increase or decrease accordingly. REU’s residential and small commercial rate structures are heavily weighted on volumetric charges ($/kWh), and abnormal weather causes more significant variances in net operating results, emphasizing the difference between the rate structure and cost structure.

The recorded results are preliminary and subject to revision until the final audit is complete.

Packet Pg. 430 Attachment: Attachment 1 - Notes on Financial Operating Statement (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) ELECTRIC UTILITY FINANCIAL RESULTS - JUNE 30, 2025
YTD-Actual YTD-Budget Variance Variance YTD-Actual
June June % Value June
Item FY2025 FY2025 FY2025 FY2025 FY2024
Energy
System Load (MWh) 783,446 728,780 7.5% 54,665 766,057
Key Performance Indicators
Days Cash on Hand 123 112
Operating Revenues
Retail Sales 143,170,997 131,408,000 9.0% 11,762,997 130,932,571 Wholesale Sales 23,734,315 14,943,000 58.8% 8,791,315 31,849,696 Miscellaneous Income1 1,924,470 5,242,503 172.4% 3,318,033 3,896,574 Total Operating Revenues 172,147,815 148,275,470 16.1% 23,872,345 166,678,841 Operating Expenses
Power Cost
Purchased Power 26,250,094 19,582,700 34.0% 6,667,394 21,163,746 Generation, Transmission and JPA (Variable) 32,082,011 29,492,900 8.8% 2,589,111 38,547,290 Generation A&G and O&M (Fixed) 28,976,964 28,015,030 3.4% 961,934 32,254,452 Subtotal Power Cost 87,309,069 77,090,630 13.3% 10,218,439 91,965,488 System O&M
General & Administrative 5,569,215 8,012,810 -30.5% (2,443,595) 4,776,755 Interdepartmental (Incl. In-Lieu of Tax)2 12,483,590 12,604,030 1.0% 120,440 13,337,298 Transmission & Distribution 35,004,309 30,339,585 15.4% 4,664,724 30,596,608 Customer & Field Services1 3,169,670 3,169,667 0.0% (3) 3,221,520 Subtotal System O&M 56,347,222 54,005,655 4.3% 2,341,56 51,932,181 7 Total Operating Expenses 143,656,291 $ 131,096,285 $ 9.6% 12,560,006 $ 143,897,669 $ Net Operating Revenue 28,491,524 $ 17,179,185 $ 65.8% 11,312,339 $ 22,781,172 $ Total Debt Service 14,850,385 $ 14,402,020 $ 3% 448,365 $ 14,399,278 $ YTD-Actual Budget % of Budget Budget YTD-Actual
June Annual Spent Remaining June
Item FY2025 FY2025 FY2025 FY2025 FY2024
Capital Outlay
Capital Outlay (Revenue Funded) 9,927,007
Capital Outlay (Bond Funded) 14,651,637 23,745,800 61.7% 9,094,163 2,991,987 Total Capital Outlay 14,651,637 $ 23,745,800 $ 61.7% 9,094,163 $ 12,918,994 $ Special Fund Expenditures
Public Benefit Programs 2,368,344 5,090,700 46.5% 2,722,356 2,399,363 Cap-and-Trade Programs 239,256 3,171,670 7.5% 2,932,414 542,037 Total Special Fund Expenditures 2,607,600 $ 8,262,370 $ 31.6% 5,654,770 $ 2,941,400 $ Financial Results (3,618,097) $ (7,478,500) $
CHANGES IN FY2024/FY2025:
1 Customer Services and Field Services are removed from the Electric Department's Financial Results, and an allocation of expenses is recorded. 2 Interdepartmental Allocations are not assigned to various divisions within the Electric Department as in previous years but recorded as its own category.

Council Report
Packet Pg. 431 Attachment: Attachment 2 - Electric Utility Financial Results for June 2025 (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) ELECTRIC UTILITY FINANCIAL DASHBOARD - JUNE 30, 2025 2.8 4.8 4.0 7.0 6.87.47.6 7.68.8 10.010.9

11.8 -
2 4
6 8
10 12
14 16
18 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
$-Millions
Retail Sales ($-Millions)
Cumulative Difference 2024 Actual 2025 Actual 2025 Budget -1.1
-0.4

0.0 -0.1

0.7 1.2

3.2 5.9

7.0 7.2 7.0

8.8 (2)
-
2 4
6 8
10 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
$-Millions
Wholesale Sales ($-Millions)
Cumulative Difference 2024 Actual 2025 Actual 2025 Budget Packet Pg. 432 Attachment: Attachment 3 - Electric Utility Financial Dashboard for June 2025 (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) ELECTRIC UTILITY FINANCIAL DASHBOARD - JUNE 30, 2025 -4.0-2.4-1.2 -1.3 0.51.23.34.7 3.6 2.83.4

12.6 (10)
(5)
-
5 10
15 20
25 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
$-Millions
Total Operating Expense ($-Millions)
Cumulative Difference 2024 Actual 2025 Actual 2025 Budget 3.3 6.1 5.7 8.79.511.213.4 16.118.620.0 20.7

23.9 -
5 10
15 20
25 30

JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
$-Millions
Total Operating Revenues ($-Millions)
Cumulative Difference 2024 Actual 2025 Actual 2025 Budget Packet Pg. 433 Attachment: Attachment 3 - Electric Utility Financial Dashboard for June 2025 (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Unrestricted Cash - 2024-25 33.5 38.5 38.9 34.3 33.2 32.6 33.4 36.6 35.8 54.4 48.1 45.2Unrestricted Cash - 2023-24 49.7 51.4 52.4 44.4 42.6 40.6 42.8 41.7 39.3 40.5 40.1 40.6

20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 70.0
MILLION $

REU UNRESTRICTED CASH BALANCE
JULY 2023 ‐ JUNE 2025
Packet Pg. 434
Attachment: Attachment 4 - Electric Utility Unrestricted Cash Balance June 2025 (9.5(a)-- Redding Electric 1 City of Redding Electric Utility
Industry Activities Update —4th Quarter FY2025
Federal Update
The past quarter has seen significant federal shifts that directly affect the outlook for renewable energy and transportation electrification. Most notably, the Administration announced that it will no longer approve new solar or wind projects on federal lands, effectively halting permitting for large-scale renewable development in those areas. This decision marks a sharp reversal from prior federal policies and has already introduced considerable uncertainty for developers planning projects tied to public lands.

In parallel, President Trump signed the One Big Beautiful Bill on July 4, 2025, which clawed back many of the tax incentives that had previously supported solar, wind, and electric vehicle deployment under the Inflation Reduction Act. The legislation imposed stricter qualification rules, requiring substantial physical construction rather than earlier “safe harbor” investment provisions, and it set tight deadlines for eligibility: projects must begin construction by mid-2026 or be placed in service by the end of 2027. As a result, nearly $19 billion worth of renewable projects have been cancelled nationwide, industry investment has dropped significantly, and several clean energy firms have entered bankruptcy. REUs’ need for additional resources remains, but the shifting federal landscape has made it increasingly difficult to identify viable options, as new projects face mounting challenges and scarcity is emerging in the development pipeline.

On the transportation side, federal actions are also poised to reshape California’s clean energy trajectory. A case currently before the U.S. District Court for Northern California challenges the state’s authority to enforce its Advanced Clean Cars II (ACC II) program through the Congressional Review Act (CRA). If the court upholds the revocation, California’s mandate requiring all new light-duty vehicle sales to be zero-emission by 2035 could be struck down. Such a ruling would also cast doubt on the state’s Advanced Clean Fleets regulation, which sets electrification requirements for medium- and heavy-duty vehicles. Together, these standards form the backbone of California’s long-term transportation electrification strategy.

For California and the West, the combined effect of curtailed federal support for renewables, restricted permitting on federal lands, and legal challenges to clean vehicle standards raises questions about how the region will meet its reliability and climate goals. In this environment, state and local action, along with private investment, will play an increasingly important role in advancing clean energy and transportation initiatives.

State Legislative Update
In September 2025, Governor Newsom signed a package of six energy affordability and climate bills aimed at reducing costs for customers, enhancing grid reliability, and advancing the state’s clean energy transition. Key measures include:

Packet Pg. 435 Attachment: Attachment 5 - Electric Utility Industry Update (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) 2  AB 1207 (Irwin) – Reauthorizes the Cap-and-Trade program (renamed Cap-and-Invest) through 2045, preserves free allowances and compliance flexibility, and shifts value from gas corporations to electrical distribution utilities (EDUs). Publicly owned utilities, including REU, must pass these proceeds back to customers as bill credits and report on their use. The package also directs auction revenues toward clean energy, housing, wildfire resilience, and transportation, while capping High-Speed Rail at $1 billion. Implementation details will be finalized through the California Air Resources Board’s (CARB) rulemaking process.
 SB 840 (Limón) – Establishes new spending priorities for the Greenhouse Gas Reduction Fund to ensure Cap-and-Invest revenues are targeted to priority programs.  AB 825 (Petrie-Norris) – Establishes a framework for the California Independent System Operator (ISO) to participate in a regional energy market if specific design requirements are met. The bill removes earlier restrictions, strengthens ISO reporting, and requires California Public Utilities Commission (CPUC) approval for investor-owned utility participation, but not for publicly owned utilities. Supported by the California Municipal Utilities Association (CMUA), the Northern California Power Agency (NCPA), and the Balancing Area of Northern California (BANC), the measure is expected to enhance grid reliability and reduce costs by expanding access to regional resources.

The petroleum sector is drawing significant attention, with refineries announcing plans to reduce or shut down operations in California, while gasoline prices remain the highest in the nation. The Governor faces increasing pressure to address affordability at the pump, with many political observers framing this as one of the most critical issues for his broader political ambitions.

The passage of this legislative package provides long-term certainty on Cap-and-Invest, refocuses climate spending priorities, and opens the door for California to benefit from regional energy markets. These measures are now moving into the regulatory phase, where implementation details will be developed.

State Regulatory Update
Following the legislative package, state agencies are preparing rulemakings to implement the new laws and continue ongoing proceedings. CARB is expected to release proposed amendments to the Cap-and-Invest program in late 2025 or early 2026, with no changes taking effect until 2026 at the earliest.

CARB also withdrew its waiver for the Advanced Clean Fleets (ACF) regulation earlier this year, removing requirements for private fleets. In July 2025, CARB opened a comment period to align the program with SB 1594, which provides exemptions for publicly owned utilities related to mutual aid, zero-emission vehicle purchases, and daily usage. There is active discussion about potentially delaying POU compliance until 2030, rather than the current January 1, 2027 date.

REU, through CMUA and NCPA, is engaged in these discussions.

Packet Pg. 436 Attachment: Attachment 5 - Electric Utility Industry Update (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) 3 The California Energy Commission (CEC) is advancing the 10th edition of the Renewables Portfolio Standard (RPS) Eligibility Guidebook, with draft language expected by the end of August 2025. CMUA has raised concerns regarding the treatment of energy storage and dynamically transferred facilities, and REU is monitoring for potential impacts on future procurements.

Finally, SB 1158 requires all retail sellers, beginning January 1, 2028, to report hourly data on electricity sources and greenhouse gas emissions. The CEC is finalizing protocols, and REU continues to work with CMUA to ensure requirements are transparent but not overly burdensome.

The recently signed legislation will now transition to regulatory proceedings, where details of implementation will be defined. REU will continue to actively monitor these rulemakings and participate through CMUA and NCPA to protect customer affordability and ensure compliance remains practical.

Conclusion
REU staff, in close coordination with the NCPA and CMUA, are actively engaging with legislative staff to advocate for public power interests. This includes requesting, and in some cases, drafting amendments to ensure that emerging legislation protects our ability to deliver safe, reliable, and affordable service to our customers.

As one of the lowest-cost electric providers in California, Redding Electric Utility remains committed to maintaining affordability while meeting state energy and climate goals. Ongoing legislative engagement is essential to preserving local control, operational flexibility, and rate stability for our community.

Packet Pg. 437 Attachment: Attachment 5 - Electric Utility Industry Update (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report)

2024 POWER CONTENT LABEL
City of Redding
City of Redding CA Utility
Electric Service Average
Greenhouse Gas Emissions Intensity
(lbs of CO
2e emitted per megawatt hour) 315 359
Electricity Sources ■ Renewables and Zero-Carbon Resources ■ Fossil Fuels and Unspecified Power RPS Eligible Renewables 27% 45%
Biomass & Biogas 0% 2%
Geothermal 0% 5%
Eligible Hydroelectric 3% 2%
Solar 0% 23%
Wind 23% 14%
Large Hydroelectric 42% 10%
Nuclear 1% 11%
Emerging Technologies 0% 0%
Other 0% 0%
Natural Gas 30% 10%
Coal & Petroleum 0% 2%
Unspecified Power (primarily fossil fuels) 0% 22%
Total 100% 100%
Retail sales covered by retired unbundled RECs 0%
■ This label does not reflect compliance with the Renewables Portfolio Standard (RPS), which measures the use of tracking instruments called Renewable Energy Credits (RECs) over the course of multi-year compliance periods. RECs that are purchased separately from the renewable energy ("Unbundled RECs") can be used for RPS compliance, but they do not factor into the power mixes or GHG emissions intensities above. ■ GHG intensity figures exclude biogenic CO2 and emissions from geothermal sources and grandfathered imports of firmed-and-shaped energy. For detailed information about all GHG emissions from California's retail electricity suppliers, visit the CEC webpage at the link below. ■ Unspecified power is electricity purchased from a genericized pool on the open market. www.reupower.com
Want to learn more? Visit
https://www.energy.ca.gov/progr
ams-and-topics/programs/power-
source-disclosure-program
Packet Pg. 438 Attachment: Attachment 6 - City of Redding 2024 Power Content Label (9.5(a)-- Redding Electric Utility's FY 24-25 Version: April 2025
Submit the Annual Report and signed Attestation in PDF format with the Excel version of the Annual Report to [email protected]. Remember to complete the Retail Supplier Name and contact information above.

NOTE: Information submitted in this report is not automatically held confidential. If your company wishes the information submitted to be considered confidential an authorized representative must submit an application for confidential designation (CECCalifornia Energy Commission's website.

If you have questions, contact Power Source Disclosure (PSD) staff at [email protected] or (916) 639-0573.

TITLE Senior Resource Planner
2024 POWER SOURCE DISCLOSURE ANNUAL REPORT
For the Year Ending December 31, 2024
Retail suppliers are required to use the posted template and are not allowed to make edits to this format. Please complete all requested information.

GENERAL INSTRUCTIONS

RETAIL SUPPLIER NAME
City of Redding

CONTACT INFORMATION
NAME Nicholas Rossow
EMAIL [email protected]

WEBSITE URL

FOR PCL

POSTING
www.reupower.com
MAILING 3611 Avtech Parkway
CITY, STATE, ZIP Redding, CA, 96002
PHONE 530-339-7200
Packet Pg. 439 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) Annual Data
Instructions:

1. Enter the electricity portfolio name in cell O25 and additional electricity portfolio names as needed in cells P25-V25.

2. Enter information about all power procurements and retail sales. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out.

3. For all specified purchases, enter the facility name, fuel type, state or province, WREGIS ID of REC source, RPS ID of REC source, EIA ID of delivered energy, gross MWhs procured, and specified resales MWhs.

4. For firmed-&-shaped procurements specifically, enter all fields from step 3. Additionally, enter the EIA ID of the substitute power in the "EIA ID of delivered energy" field and select "Yes" in the "Firmed-&-Shaped Resource?" field. If the associated GHG emissions are eligible for firmed-&-shaped

5. Proxy EIA IDs for unspecified power and specified system mixes from asset-controlling suppliers have been provided. Enter "Unspecified Power", "BPA", or "Tacoma Power" as applicable.

6. Proxy EIA IDs for aggregated reporting of WAPA CVP or PCIA resoures; Enter "CVP", "PCIA Solar", "PCIA Wind", "PCIA Eligible Hydro", or "PCIA Large Hydro" as applicable.

7. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in the individual electricity portfolio tables to the right after all specified resources have been allocated.

8. Allocate net MWhs procured to each electricity portfolio until the loads are balanced across each portfolio. If the total Net MWhs Procured exceeds the total retail sales of all portfolios, allocate only enough MWh to meet the retail sales of each portfolio.

Over allocation
check ✓
Under allocation
check ✓
Coal check ✓
Negative
oversupply check ✓
Packet Pg. 440 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric Retail Sales 733009
Unmet Load
0 0
Facility Name Fuel Type State or
Province

WREGIS ID
of REC
source
RPS ID of
REC
source
EIA ID of
delivered
energy
Gross
MWhs
Procured
Specified
Resales
MWhs
Net MWhs
Procured
Firmed &
Shaped
Resource?
Eligible for Firmed &
Shaped
Grandfathering?
Total EF
(MT
CO2e/MWh)
Total
GHGs
PCL EF
(MT
CO2e/MWh)
City of Redding
Electric Service
Electricity Portfolio
#2 Name
Whiskeytown Hydro Eligible Hydroelectric CA W851 61135 7189 19632 19632 0.0000 0.0000 19632 Nimbus Power Plant Eligible Hydroelectric CA W1161 61045 444 5565 5565 0.0000 0.0000 5565 Stampede Power Plant Eligible Hydroelectric CA W1177 61046 7066 307 307 0.0000 0.0000 307 Lewiston Power Plant Eligible Hydroelectric CA W1108 61044 977 0.0000 0.0000 Big Horn 1 Wind WA W240 60776 56361 31997 31997 0.0000 0.0000 31997 Big Horn 1 Wind WA W240 60776 Unspecified Po 136951 136951 Yes Yes 0.4280 58615 0.0000 136951 Redding Power Plant Natural Gas CA 7307 272174 48775 223399 0.4656 104015 0.4656 223399 WAPA - New Melones Large Hydroelectric CA 6158 29954 29954 0.0000 0.0000 29954 WAPA - Shasta Power Plant Large Hydroelectric CA 445 128286 128286 0.0000 0.0000 128286 WAPA - Spring Creek Power Plant Large Hydroelectric CA 450 18202 18202 0.0000 0.0000 18202 WAPA - Trinity Power Plant Large Hydroelectric CA 451 22011 22011 0.0000 0.0000 22011 WAPA - Folsom Power Plant Large Hydroelectric CA 441 33385 33385 0.0000 0.0000 33385 WAPA - Gianelli Power Plant Large Hydroelectric CA 448 6636 6636 0.0000 0.0000 6636 WAPA - JF Carr Power Plant Large Hydroelectric CA 442 13897 13897 0.0000 0.0000 13897 WAPA - Keswick Power Plant Large Hydroelectric CA 443 19681 19681 0.0000 0.0000 19681 WAPA - O'Neil Power Plant Large Hydroelectric CA 446 84 84 0.0000 0.0000 84 Bonneville Power Administration - ACS Large Hydroelectric BPA 33513 33513 0.0160 536 0.0160 33513 Bonneville Power Administration - ACS Nuclear BPA 4369 4369 0.0160 70 0.0160 4369 Bonneville Power Administration - ACS Other BPA 287 287 0.0160 5 0.0160 287 Bonneville Power Administration - ACS Unspecified Power - ACS BPA 1614 1614 0.0160 26 0.0160 1614 Tacoma Power - ACS Large Hydroelectric WA Tacoma Powe 2871 2871 0.0230 66 0.0230 2871 Tacoma Power - ACS Nuclear WA Tacoma Powe 189 189 0.0230 4 0.0230 189 Tacoma Power - ACS Unspecified Power - ACS WA Tacoma Powe 180 180 0.0230 4 0.0230 180 Boundary Hydro Large Hydroelectric WA 6433 84 84 0.0000 0.0000 Box Canyon Dam (WA) Large Hydroelectric WA 50179 156934 156934 0.0000 0.0000 Lake Chelan Hydro Large Hydroelectric WA 6424 226 226 0.0000 0.0000 MID-C Hydro Rock Island Large Hydroelectric WA 6200 2185 2185 0.0000 0.0000 Mid-C Hydro - Rocky Reach (Chelan Co Large Hydroelectric WA 3883 7726 7726 0.0000 0.0000 Packet Pg. 441 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric City of Redding Electric Service Portfolio Totals PCL Data Retail Sales 733009
Total Specified 733009
Biomass & Biogas
0 0%
Geothermal
0 0%
Eligible Hydroelectric 25504 3%
Solar
0 0%
Wind 168948 23%
Large Hydroelectric 308520 42%
Nuclear 4558 1%
Emerging Technologies
0 0%
Other 287 0%
Natural Gas 223399 30%
Coal & Petroleum
0 0%
Unspecified Power - ACS 1794
Unspecified Power - Spot Market
0 Unspecified Power - Total 1794 0%
Total PCL GHGs (MT CO
2e) 104725.8
Emissions intensity (MT CO
2e/MWh) 0.143
PCL GHG Intensity (lbs CO
2e/MWh) 315
Unbundled REC %
0%
Packet Pg. 442 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric 0 0 0 0 0 0
City of Redding Electric Service
Electricity Portfolio
#3 Name
Electricity Portfolio
#4 Name
Electricity Portfolio
#5 Name
Electricity Portfolio
#6 Name
Electricity Portfolio
#7 Name
Electricity Portfolio
#8 Name Remainder/Oversupply Facility Name Fuel Type Net Procurement Annual
PCL
GHGs (MT
CO2e)
Whiskeytown Hydro Eligible Hydroelectric 19631.645 0
Nimbus Power Plant Eligible Hydroelectric 5565 0
Stampede Power Plant Eligible Hydroelectric 307 0
- - - 0
Big Horn 1 Wind 31997 0
Big Horn 1 Wind 136951 0
Redding Power Plant Natural Gas 223399.355 104014.74
WAPA - New Melones Large Hydroelectric 29953.8 0
WAPA - Shasta Power Plant Large Hydroelectric 128285.8 0 WAPA - Spring Creek Power Plant Large Hydroelectric 18202.3 0 WAPA - Trinity Power Plant Large Hydroelectric 22011 0
WAPA - Folsom Power Plant Large Hydroelectric 33384.5 0 WAPA - Gianelli Power Plant Large Hydroelectric 6636.2 0 WAPA - JF Carr Power Plant Large Hydroelectric 13897.1 0 WAPA - Keswick Power Plant Large Hydroelectric 19681.3 0 WAPA - O'Neil Power Plant Large Hydroelectric 84 0
Bonneville Power Administration - ACS Large Hydroelectric 33512.88738 536.2062 Bonneville Power Administration - ACS Nuclear 4368.734082 69.899745 Bonneville Power Administration - ACS Other 286.651739 4.5864278 Bonneville Power Administration - ACS Unspecified Power - A 1613.726794 25.819629 Tacoma Power - ACS Large Hydroelectric 2870.721648 66.026598 Tacoma Power - ACS Nuclear 189.043956 4.348011
Tacoma Power - ACS Unspecified Power - A 180.234396 4.1453911 - - - 0
- - - 0
- - - 0
- - - 0
- - - 0
Packet Pg. 443 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric

RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS RETIRED UNBUNDLED RECS Facility Name Fuel Type
State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh) Facility Name Fuel Type State or
Province RPS ID Total Retired (in MWh)
Electricity Portfolio #4 Name
Total Retired Unbundled
Electricity Portfolio #2 Name
Total Retired Unbundled Total Retired Unbundled
City of Redding Electric Service Electricity Portfolio #3 Name Total Retired Unbundled
Electricity Portfolio #5 Name Electricity Portfolio #6 Name Electricity Portfolio #7 Name Electricity Portfolio #8 Name Total Retired Unbundled Total Retired Unbundled Total Retired Unbundled Total Retired Unbundled Packet Pg. 444 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) Net MWh Procured N/A Resource Type Resource Mix Factors Resource-Specific Procurements
from ACS
39,782 Biomass & biogas -
Geothermal -
Eligible hydroelectric -
Solar -
Wind -
Coal -
Large hydroelectric 0.84 33,513
Natural gas -
Nuclear 0.11 4,369
Other 0.01 287
Unspecified Power 0.04 1,614
Net MWh Procured N/A Resource Type Resource Mix Factors Resource-Specific Procurements
from ACS
3,240 Biomass & biogas -
Geothermal -
Eligible hydroelectric -
Solar -
Wind -
Coal -
Large hydroelectric 0.89 2,871
Natural gas -
Nuclear 0.06 189
Other -
Unspecified Power 0.06 180

ASSET CONTROLLING SUPPLIER RESOURCE MIX CALCULATOR
Bonneville Power Administration
Tacoma Power
Instructions: Enter total net specified procurement of ACS system resources into cell A8 or A23.

In Column E, the calculator will determine quantities of resource-specific net procurement for entry on Schedule 1.

Packet Pg. 445 Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report) Packet Pg. 446
Attachment: Attachment 7 - City of Redding 2024 Power Source Disclosure (9.5(a)-- Redding Electric Utility's FY 24-25 Financial Report)