1 of 3
Redlands Regular Meeting 06-21-2022 436 of 1716
Part # Description Qty Unit Price Ext. Price
271083 8 pack MediaWorks PLUS (web) concurrent license
115021 FREE**** Enhanced Reporting Package
209029 FREE- 911 NENA ANI/ALI CAD Spill Integration - USA/Canada only 271111 FREE--Eventide MP3 option for MediaWorks DX
271109 FREE--Eventide SSL Enabler option
Install-Kit FREE--Install Kit, Voice Logging
UPS FREE--UPS SMART 1500 120V-1KW-1440VA-USB RACK MNT
DXSUS-12MO FREE 1st YEAR! (SMA) Software Update Subscription (DXSUS) for complete DX-Series recording Solution,
**NAS Auto Archiving Separate device** (4TB) USABLE
STORAGE
RR230400-NAS NETGEAR ReadyNAS 2304, (6TB in a RAID array) Rackmount 1U 1 $2,250.00 $2,250.00 4-bay, Dual Gigabit **(4TB Usable Storage)**
Includes Install and Support Services for 24 months Warranty **48 month-24/7 Warranty & Service Support Maintenance ** **INCLUDES: 1 $14,650.00 $14,650.00
CNVL-Support Full Warranty Coverage including 800# Phone Remote & LOCAL Onsite Labor Support, Full Hardware & Software Warranty -24/7 ---48 Months of coverage from date of Delivery.
DXSUS-12MO Software Update Subscription (DXSUS) for complete DX-Series recording Solution, (48 months)
Installation Onsite & Training Services
Inst--PM Capture Technologies Project Management & Certified Local 1 $4,500.00 $4,500.00 Installation Onsite.
INCLUDED Project Management
INCLUDED Server Burn In
INCLUDED Server Install
INCLUDED NEW Application Training performed by Installing Engineer Onsite
2 of 3
Redlands Regular Meeting 06-21-2022 437 of 1716
Part # Description Qty Unit Price Ext. Price
SubTotal $40,510.00
Tax $1,365.88
ShippingFOB Destination
$0.00
Total $41,875.88
To accept this quotation sign here and return
Signature Date
Thank You For Your Business!
Did you know that Secure deposits & payments can now be made online at www.capturet.com
3 of 3
Redlands Regular Meeting 06-21-2022 438 of 1716
Sole Source/ Single Source/ Standardization Form
For procurement of supplies, equipment and services valued at $5,000 and over NOTE: Every question must be answered with appropriate documentation attached; incomplete forms will be immediately rejected by Purchasing.
Date:_______________________
TO: Purchasing Division
FROM: ________________________________
Purchase Requisition # ___________________
Estimated Total Cost: $_________________
Proposed Vendor: ______________________
Request Term: _________________
This form must accompany the purchase document whenever an exception to the competitive process is requested. Requests for goods and/or services from a specific vendor or limited to a specific brand, where substitutes to the recommended vendor or brand are unacceptable, must be accompanied by a written justification explaining the circumstances that make alternatives unacceptable.
The City Manager will determine whether the justification is appropriate. Requests for exception must be supported by factual statements that will pass an audit.
Redlands Regular Meeting 06-21-2022 439 of 1716
INSTRUCTIONS
1. Please check all applicable categories (a. through i.) below and provide additional information where indicated.
a. The requested product is an integral repair part or accessory compatible with existing equipment.
Existing Equipment:
Manufacturer/Model Number:
Age:
Current Estimated Value:
b. The requested product has unique design/performance specifications or quality requirements that are not available in comparable products. c. I have standardized the requested product and the use of another brand/model would require considerable time and funding to evaluate.
d. The requested product is one in which I (and/or my staff) have specialized training and/or extensive expertise. Retraining would incur substantial cost in time and/or funding.
e. The requested product is used or demonstration equipment available at a lower-thannew cost. f. Repair/Maintenance service is available only from manufacturer or designated service representative.
g. Upgrade to or enhancement of existing software is available only from manufacturer. h. Service proposed by vendor is unique; therefore, competitive bids are not available or applicable.
i. Other factors (provide detailed explanation in #2 below).
2. Provide a detailed explanation and pertinent documentation for each category checked in item 1 above. Attach additional sheets if necessary:
Redlands Regular Meeting 06-21-2022 440 of 1716
3. Was an evaluation of other equipment, products, or services performed? Yes No
If yes, please explain the type of evaluation performed and provide all supporting documentation:
4. List below the name of each individual who was involved in the evaluation, if conducted, and in making the recommendation to procure this product or service. Attach additional information, if necessary.
5. Explain what action(s) the department would take if the sole/single source services were no longer available
6. I certify that the above information is accurate to the best of my knowledge, and a signed copy of this document will be kept on file and available for audit in my department _________________________________________________________ Prepared by Date
_________________________________________________________ Department Director Date
Purchasing Approvals
______________________________________________________
Purchasing Agent Approval Date
_______________________________________________________ City Manager Approval Date
Redlands Regular Meeting 06-21-2022 441 of 1716
City Council Meeting H. 15.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Approve the Interlocal Agreement Between the Town of Apple Valley, the Cities of Adelanto, Barstow, Chino, Colton, Fontana, Hesperia, Highland, Montclair, Ontario, Rancho Cucamonga, Redlands, Rialto, San Bernardino, Twentynine Palms, Upland, Victorville, and the County of San Bernardino Concerning Distribution of the 2021 Justice Assistance Grant Award, and an additional appropriation of $17,538 dollars to the police department (Police Chief Catren)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
I move to approve the Interlocal Agreement Between the Town of Apple Valley, the Cities of Adelanto, Barstow, Chino, Colton, Fontana, Hesperia, Highland, Montclair, Ontario, Rancho Cucamonga, Redlands, Rialto, San Bernardino, Twentynine Palms, Upland, Victorville, and the County of San Bernardino Concerning Distribution of the 2021 Justice Assistance Grant Award, and an additional appropriation of $17,538 dollars to the police department.
RECOMMENDATION:
Staff recommends that City Council approve the Interlocal Agreement Between the Town of Apple Valley, the Cities of Adelanto, Barstow, Chino, Colton, Fontana, Hesperia, Highland, Montclair, Ontario, Rancho Cucamonga, Redlands, Rialto, San Bernardino, Twentynine Palms, Upland, Victorville, and the County of San Bernardino Concerning Distribution of the 2021 Justice Assistance Grant Award, and an additional appropriation of $17,538 dollars to the police department.
Redlands Regular Meeting 06-21-2022 442 of 1716
DISCUSSION:
As in past years, the Redlands Police Department (RPD) is entitled to a share of the 2021 Justice Assistance Grant (JAG) Award monies which are allocated based city population. All of the above listed governmental agencies agree to allow the County of San Bernardino to administer the grant funds and to distribute to each agency their allocated monies to expend the funds in accordance with JAG guidelines. The RPD will receive $17,538. The police department plans to utilize the $17,538 to expand its community-based automated license plate reader program (ALPR).
The RPD has partnered with various community stakeholders to create a community-based ALPR camera program on a small scale due to budgetary constraints. This grant project will allow the City of Redlands to expand the program which will no doubt help solve or prevent acts of violence and other crimes. ALPRs are high-speed camera systems that photograph license plates, convert the numbers and letters into machine-readable text, tag them with the time and location, and upload that data into a database for retrieval.
Regionally, law enforcement agencies that use ALPRs compare plates to a "hot list" of plates suspected of being connected to violent crimes, child abduction, and terrorist activity. Many cities throughout San Bernardino County are already participating in ALPR information sharing.
The RPD is sensitive to concerns regarding ALPRs and has been very transparent in the manner it deploys such cameras by holding townhall meetings, explaining deployments, allowing the Redlands Privacy Council to vet the program, and preparing City Council staff reports which further allow the public to comment on the program. The RPD utilizes the vendor Flock Safety, Inc. to install these cameras at strategic locations to capture vehicles leaving certain areas of the city in an effort to identify suspects who have just committed a crime. The Flock Safety vendor focuses on addressing privacy concerns and only retains the images of the vehicles for 30 days. Access to the images is regulated by RPD policy, which can be found on the RPD's website. Currently, there are 32 Flock Safety cameras deployed in the City of Redlands. The City only pays for seven of those 32 cameras. Residents, business owners, and other organizations have funded the other 25 cameras.
ALTERNATIVES:
Do not accept the grant.
Redlands Regular Meeting 06-21-2022 443 of 1716
STRATEGIC PLAN:
N/A
SUBMITTED BY:
Christopher R. Catren, Chief of Police
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Travis Martinez, Deputy Chief
Fiscal Impact
Fiscal Year: 22-23
Revenue Generating: Y
Appropriation Required Y/N: Y
Amount: 17538
Budgeted Y/N: N
Discussion:
Attachments
JAG Agreement
Additional Appropriation
Redlands Regular Meeting 06-21-2022 444 of 1716
Redlands Regular Meeting 06-21-2022 445 of 1716
Redlands Regular Meeting 06-21-2022 446 of 1716
Redlands Regular Meeting 06-21-2022 447 of 1716
Redlands Regular Meeting 06-21-2022 448 of 1716
Redlands Regular Meeting 06-21-2022 449 of 1716
Redlands Regular Meeting 06-21-2022 450 of 1716
Redlands Regular Meeting 06-21-2022 451 of 1716
Redlands Regular Meeting 06-21-2022 452 of 1716
Redlands Regular Meeting 06-21-2022 453 of 1716
Redlands Regular Meeting 06-21-2022 454 of 1716
Redlands Regular Meeting 06-21-2022 455 of 1716
Redlands Regular Meeting 06-21-2022 456 of 1716
Redlands Regular Meeting 06-21-2022 457 of 1716
Redlands Regular Meeting 06-21-2022 458 of 1716
Redlands Regular Meeting 06-21-2022 459 of 1716
Redlands Regular Meeting 06-21-2022 460 of 1716
Redlands Regular Meeting 06-21-2022 461 of 1716
Redlands Regular Meeting 06-21-2022 462 of 1716
Redlands Regular Meeting 06-21-2022 463 of 1716
CITY OF REDLANDS
REQUEST FOR ADDITIONAL APPROPRIATION
DATE OF REQUEST: 04/21/2022 FINANCE USE ONLY
TRANSACTION NO:
An additional appropriation is hereby requested as follows: ACCOUNTING PERIOD: -------- Department: Police
------------
EXPENDITURE APPROPRIATION INCREASE (if applicable)
Account Description Orgkey Object Code Job Ledger (If Amount applicable) All Other Equipment 200202 8706 F202027 17,538.00
$ 17,538.00 -
REVENUE APPROPRIATION INCREASE (if applicable)
Account Description Orgkey Object Code Job Ledger (If Amount applicable) Federal Grants 200202 4407 F202027 17,538.00
$ 17,538.00 -
JUSTIFICATION: JAG 2021 Grant Award
Requested By:
Department Head
Recommended By Finance Director: Recommended:
City Manager
Yes No Signed --- --- --------
Comments: ---------------- Approved by City Council:
Date:
Signed:
------------ City Clerk
Redlands Regular Meeting 06-21-2022 464 of 1716
City Council Meeting H. 16.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Receive and File notice of issuance of an emergency sole source purchase order with Ontario Refrigeration for compressor at State Street City Hall in the amount of $71,108 (Assistant City Manager Boatman)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
I move to receive and file the notice of issuance of an emergency sole source purchase order with Ontario Refrigeration in the amount of $71,108.
1. RECOMMENDATION:
Staff recommends that the City Council receive and file the notice of issuance of an emergency sole source purchase order with Ontario Refrigeration in the amount of $71,108.
DISCUSSION:
On May 25, 2022, one of the two compressors at the State Street City Hall facility failed. Per Redlands Municipal Code 2.16.130 an emergency purchase order was appropriate as this was "a breakdown in machinery or essential service which requires the immediate procurement of goods, services or non-public project construction work, to protect the public health, welfare, safety or property." On June 2, 2022, the City's Procurement Manager issued Purchase Order Number 22212275, which is attached as a reference.
Redlands Regular Meeting 06-21-2022 465 of 1716
ALTERNATIVES:
Not Applicable
STRATEGIC PLAN:
Not Applicable
SUBMITTED BY:
Chris Boatman, Assistant City Manager
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Dana Abramovitz-Daniel, Procurement Manager
PREPARED BY:
Tricia Swope, Manager, Facilities and Community Services Fiscal Impact
Fiscal Year: FY 2021-22
Amount: $71,018
Account No.: 101310
Discussion:
There is sufficient funding included in the City Hall/State Street Division budget to cover the expenses related to this sole source emergency procurement.
Attachments
A. Purchase Order 22212275
Redlands Regular Meeting 06-21-2022 466 of 1716
Vendor
Bill To
Fiscal Year
Department
Purchase Order Date
Purchase Order Number
Required By
Ship To
VENDOR PHONE NUMBER VENDOR FAX NUMBER VENDOR NUMBER REQUISITION NUMBER BUYER NAME DELIVERY REFERENCE NOTES
ITEM # DESCRIPTION QUANTITY UOM UNIT PRICE EXTENDED PRICE
PURCHASE ORDER
2728
ONTARIO REFRIGERATION SERVICE INC
635 S MOUNTAIN AVE
ONTARIO, CA 91762
CITY OF REDLANDS
PO BOX 3005
REDLANDS, CA 92373
EMAIL: [email protected]
*Emailing invoice and referencing PO No.
is required and will expedite payment*
.
FINBIL
22212275
FACILITIES & COMMUNITY SERVICE
06/02/2022
THIS PURCHASE ORDER NUMBER MUST APPEAR ON
ALL INVOICES, PACKAGES, AND SHIPPING PAPERS.
06/02/2022
2022 Page 1 of 1
FCSD City Hall
35 Cajon St
Suite 222
Redlands, CA 92373
FCSHLL
2728 12213007 Larry Alms EMERGENCY PURCHASE ORDER
CITRUS CENTER COMPRESSOR REPLACEMENT
EMERGENCY PURCHASE ORDER AS PER QUOTE NO.118053122A DATED MAY 31, 2022. .
PREVAILING WAGES REQUIREMENT: THIS PROJECT IS SUBJECT TO STATE PREVAILING WAGE LAWS. THE VENDOR SHALL USE THE WAGE DETERMINATION PER DIR REGULATIONS.
.
CITRUS CENTER HANDBELL SCREW COMPRESSOR REPLACEMENT AT 300 E STATE 1.0000 EA $71,018.0000 $71,018.00 STREET.
1 PROCUREMENT MANAGER Purchase Order Total
Total Ext. Price $71,018.00
$71,018.00
PURCHASING DIVISION - 1270 W. PARK AVE. REDLANDS, CA 92373 - Email: [email protected]
PLEASE SEE ATTACHED PURCHASE ORDER TERMS AND CONDITIONS Redlands Regular Meeting 06-21-2022 467 of 1716
CITY OF REDLANDS
PURCHASE ORDER TERMS AND CONDITIONS
unless otherwise specified in an executed agreement, the following shall apply
1. INVOICES: Each purchase order is to be invoiced separately and all invoices shall be submitted to the billing address as shown on the front of the Purchase Order. All invoices, shipping documents, correspondence, and-related papers must have the purchase order number and consignee shown clearly in their face.
2. PACKAGING AND DRAYAGE: Unless so specified on the Purchase Order and evidenced by a copy of the freight bill attached to the invoice, there shall be no charge to the City for either packaging and/or drayage
3. INSPECTION: All materials and workmanship provided under the terms of the Purchase Order are subject to inspection and test by the City to ensure compliance with the requirements and specifications contained therein. In the event that the goods or services delivered are defective, or are not in conformity with the Purchase Order, the City shall have the right to either reject said goods or services, or require that they be corrected or otherwise brought into conformity with the terms set forth in the Purchase Order.
4. RESPONSIBILITIES: Unless otherwise specified in the Purchase Order, the supplier/contractor shall be responsible for all items covered in said Purchase Order until delivered at the designated delivery point and thereafter accepted by the City. Supplier/contractor shall bear all risks as the goods and services provided until they are finally accepted by the City. Upon the City’s notice to supplier/contractor of its rejection of the goods or services provided or the need for the correction thereof. All such defective goods or services shall be removed from City premises, and any and all expenses incurred in the removal and/or correction of such defective goods or services shall be borne entirely by the supplier/contractor.
5. ACCEPTANCE: The City’s final acceptance of the goods or services provided under the Purchase Order shall be conclusive except in those instances where a latent defect or fraud is subsequently discovered, or when a supplier/contractor has committed such gross mistakes that they are tantamount to a fraud. The City’s failure to inspect and either accept or reject the goods or services delivered shall not relieve the supplier/contractor for the responsibility for strict compliance with the terms and specifications of the Purchase Order.
6. CHANGES: This Purchase Order may, at any time, be changed with regard to the materials or services to be furnished, the quantity ordered, the unit price, discount, delivery point or arrangements, terms or any other matters affecting a valid order. However, in order to be effective, any such change or amendment causes an increase or decrease in the cost of performance hereunder, an equitable adjustment shall be made to reflect the increase or the decrease in the cost thereof. Any such adjustment shall be subject to the written approval of the Purchasing Agent. No variation in the quality, quantity, or coat of any item called for by this Purchase Order Shall be acceptable by the City except in pursuance of a written Change Order approved by the Purchasing Agent.
7. TERMINATION: This Purchase Order may be terminated, in whole or in part, at any time, by written notice to the supplier/contractor. Such termination shall be effective with respect to the quantity, manner, and time specified in such notice. The City shall be liable at the stipulated price only for such materials and/or services as have been delivered and/or rendered and accepted as of the effective date of said written notice. The City shall not be liable for any excess cost arising out of such termination, and failure of the supplier/contractor to cease delivery and/or work upon receipt of such termination notice shall not occasion a claim for extra costs.
8. TIME IS OF THE ESSENCE: In the event that the supplier/contractor fails to perform this Purchase Order within the time specified, the Purchasing Agent may, by written notice, order the supplier/contractor to cease further deliveries and may hold the supplier/contractor liable for any damages caused to the City by reason of such delay. If no time is specified, it is expected that the supplier/contractor shall begin performance within a reasonable time after placement of the order. The City may extend periods of performance if the facts as to the cause of the delay, in sole opinion of the Purchasing Agent, justify such an extension.
9. LIABILTIY: The supplier/contractor shall defend, indemnify and hold harmless the City, its elected officials, officers, employees, and agents from all claims, losses, damages, costs, expenses and suits, in law or in equity, because of personal injury, property damage, or alleged or actual patent infringements, based on the performance of this Purchase Order or asserted against it. Further, supplier/contractor warrants that the City shall not be responsible for any damages that may be claimed by reason or death injury of the person of the supplier/contractor’s officer, agents, employees, invitees or licensees or for damage to any property of the supplier/contractor or any other damage that may arise or result at anytime because of personal injury or damage to property sustained by any other person or persons, which may have been caused or contributed by proximately or otherwise by reason of, or in course of, carrying out this Purchase Order.
10. DISPUTES: All disputes concerning questions of fact which may arise under this Purchase Order under this Purchase Order, and not disposed of by mutual agreement and/or consent, shall be decided by the sole discretion of the Purchasing Agent. All disputes concerning questions of law, which may arise under this Purchase Order, shall be decided under applicable laws of the State of California.
11. PAYMENTS: Payments shall be made upon submission of an itemized invoice, presented in duplicate of the prices stipulated in the Purchase Order and within 30 days of becoming due for supplies delivered and accepted or services rendered and accepted, less deductions if any. When requested by the supplier/contractor, payment on partial deliveries may be made whenever, in the sole discretion of the Purchasing Agent, the surrounding circumstances warrant such partial payment. In the event and, if for any reason, an overpayment is made; the City requires prompt refund of said overpayment by way of supplier/contactor’s properly referenced check.
12. LICENSOR: All supplier/contractors who perform work within the City, must have on file at the Redlands City Revenue Office, a current and valid city business license.
13. CONFORMITY WITH SAFETY ORDERS: The goods and/or services covered by this Purchase Order or contract must conform to the safety order of OSHA, CAL-OSHA, and/or NIOSHA and any and all applicable material safety data sheets (MSDS).
14. PREVAILING WAGES: When applicable, the City is subject to the State of California prevailing wage laws as set forth in California Labor Code Section 1770 et seq. The contractor is responsible for determining the appropriate Department of Industrial Relations (DIR) classification for the various employees and subcontractors used for a particular project or service. The rates for each classification are posted on the DIR website at http://www.dir.ca.gov/DIRdatabases.html. All contractors performing work for the City are responsible for abiding by all applicable prevailing wage laws, and must furnish the City with Certified Payroll Records upon request.
Redlands Regular Meeting 06-21-2022 468 of 1716
City Council Meeting H. 17.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Approve a license agreement with David Kramer for use of the Orange Street Alley for outdoor dining purposes and determination that approval of the license agreement is categorically exempt from environmental review pursuant to Section 15301 of the California Environmental Quality Act Guidelines (Assistant City Manager Boatman)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motions are provided:
I move to determine that approval of the license agreement with David Kramer for use of the Orange Street Alley for outdoor dining purposes is categorically exempt from further environmental review pursuant to Section 15301 of the California Environmental Quality Act Guidelines; and
1. 2. I move to approve the License Agreement with David Kramer.
RECOMMENDATION:
Staff recommends that the City Council approve the license agreement with David Kramer for use of the Orange Street Alley and determine that approval of the project is categorically exempt from further environmental review pursuant to Section 15301 of the California Environmental Quality Act Guidelines.
DISCUSSION:
The Orange Street Alley was re-purposed into a public park and includes enhanced pedestrian elements such as pavers, raised planters, decorative light standards, arched trellises, and gates. Since its completion, it has become a space not only for pedestrians, but also for restaurants who want to provide an outdoor dining experience for their patrons. On December 18, 2018, the City Redlands Regular Meeting 06-21-2022 469 of 1716
Council approved a license agreement with David Kramer to lease 550 square feet of space within the alley for outdoor dining purposes. The current agreement with Mr. Kramer expires July 2, 2022. Mr. Kramer is requesting to enter into another agreement to continue the use of the park for outdoor dining purposes associated with his restaurant, The Cope House. The attached agreement is for a three-year term with a cost $3.50 per square foot. Monthly rent will equate to $1,925.00 or $23,100.00 annually. The attached agreement will begin on July 3, 2022, and will end July 3, 2025.
Approval of the license agreement is exempt from further environmental review pursuant to Section 15301 of the California Environmental Quality Act guidelines. This section pertains to licensing existing facilities involving negligible or no expansion of use. The subject area within the Orange Street Alley consists of an existing park and approval of the license agreement will have a negligible expansion of the existing use. The license agreement permits Mr. Kramer to use the park for outdoor dining purposes.
ALTERNATIVES:
The City Council may decline the approval of the license agreement and provide alternative direction to staff.
STRATEGIC PLAN:
N/A
SUBMITTED BY:
Chris Boatman, Assistant City Manager
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Joe Bierma, Administrative Analyst
Fiscal Impact
Fiscal Year: FY 2021-22
Revenue Generating: Y
Amount: $23,100
Redlands Regular Meeting 06-21-2022 470 of 1716
Account No.: 101303
Discussion:
The License Agreement requires payment of rent in the amount of $1,925.00 per month or $23,100.00 annually during the term of the Agreement which will be deposited into the Parks Division Fund (101303).
Attachments
Agreement
Redlands Regular Meeting 06-21-2022 471 of 1716
LICENSE AGREEMENT BY AND BETWEEN THE CITY OF REDLANDS
AND DAVID KRAMER DOING BUSINESS AS THE COPE HOUSE
This License Agreement (“License”) is made and entered this 21st day of June, 2022 (“Effective Date”), by and between the City of Redlands, a municipal corporation and general law city (“City”), and David Kramer, an individual, dba The Cope House (“Licensee”). City and Licensee are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
RECITALS
WHEREAS, Licensee is the owner and operator of a restaurant, commonly known as The Cope House, located at 19 East Citrus Avenue in the City of Redlands; and WHEREAS, Licensee desires to provide its customers with an outdoor dining venue within City’s Orange Street Alley Park (the “Park”); and
WHEREAS, City is the owner in fee simple of the Park particularly described in Exhibit “A” attached hereto and incorporated by reference herein; and WHEREAS, City and Licensee are presently parties to a park license agreement, dated December 18, 2018, which expires on July 2, 2022; and
WHEREAS, it is the desire of City and Licensee to enter into this new License to set forth terms and conditions pursuant to which City will continue to license a portion of the Park to Licensee.
NOW, THEREFORE, in consideration of the mutual promises contained herein, City and Licensee agree as follows:
AGREEMENT
Section 1. Premises. City hereby grants to Licensee a revocable, non-excusive license to provide outdoor dining services within City’s Park in connection with the operation of Licensee’s The Cope House restaurant located adjacent to the Park (the “License”). The outdoor dining area subject to this License consists of approximately five hundred fifty (550) square feet located adjacent to 19 East Citrus Avenue, Redlands((the “Premises”) and is more particularly described in Exhibit “A,” which is attached hereto and incorporated herein by this reference.
Section 2. Acknowledgment of License and Disclaimer of Tenancy.
A. Licensee acknowledges and agrees that City is the owner of the Premises and that nothing in this License grants to Licensee any right, title or interest in the Premises, except for the revocable, non-exclusive right to use the Premises as provided in this License. Licensee is not a tenant or lessee of City and holds no rights of tenancy or leasehold in relation to the Premises.
Redlands Regular Meeting 06-21-2022 472 of 1716
B. In consideration of City’s grant of this License, Licensee specifically and expressly waives, releases, and relinquishes any and all rights to assert any claim of right, privilege or interest in the Premises other than the rights expressly granted by this License.
C. The consideration paid by Licensee pursuant to Section 4 of this License is consistent with the value of the rights comprising the License privilege; the consideration is not consistent with the higher market value for a greater right, privilege or interest (such as a lease) in the Premises.
D. Licensee further acknowledges and agrees that without the representations and agreements set forth herein, City would not enter into this License.
Section 3. Term. The term of this License shall commence on July 3, 2022, and end on July 3, 2025, unless earlier terminated as provided for herein. Either Party may terminate this License by providing written notice of such termination to the other Party at least thirty (30) days prior to the noticed termination date. Upon termination or expiration of this License, and upon request of Licensor, Licensee shall remove, as requested by Licensor, any improvements, fixtures, equipment and other personal property placed upon the Premises by Licensee. The cost and expenses of such removal, together with the repair of any damage occasioned thereby, will be borne solely by the Licensee. If Licensee remains in possession of the Premises after expiration or earlier termination of this License without City’s written consent, Licensee’s continued occupancy of the Premises shall be equivalent to a tenancy at sufferance and Licensee shall pay an increased License fee during the holdover period in the sum of one thousand dollars ($1,000) per month.
Section 4. License Fee. Licensee shall pay to City a monthly fee in the sum of one thousand nine hundred and twenty-five dollars ($1,925.00) for use and occupancy of the Premises.
The initial monthly fee payment shall be paid to City prior to July 10, 2022. All subsequent monthly fee payments shall be made prior to the tenth day of each month for which the License Fee is then due. All payments are to be made payable to the City of Redlands, Finance Department/Revenue Division, P.O. Box 3005, Redlands, California, 92373. A late fee of fifty dollars ($50.00) shall be added and due for any License Fee made after the tenth day of the month.
Any dishonored check shall be considered as an unpaid License Fee.
Section 5. Security Deposit. The security deposit presently held by City in the amount of one thousand dollars ($1,000.00) shall be retained by City to secure compliance with the terms and conditions of this License, and shall be refunded to Licensee within thirty (30) days after the Premises have been vacated by Licensee, less any amounts reasonably necessary to pay City for, (i) cleaning costs, (ii) cost for repair or damages to the Premises exclusive of ordinary wear and tear, and (iii) any other amount legally allowable under the provisions of this License. A written accounting of said costs and damages shall be presented to Licensee within ten (10) days of the Premises being vacated. If the security deposit is insufficient to pay City for such costs and damages, Licensee shall immediately pay any additional costs for damages as demanded by City.
Section 6. Use of Premises.
Redlands Regular Meeting 06-21-2022 473 of 1716
A. Licensee shall use the Premises solely for the purpose of outdoor dining associated with Licensee’s operation of The Cope House restaurant and no other uses.
B. During the term of this License, Licensee shall use the Premises and any improvements thereon in compliance with all applicable federal state, and local laws, and all applicable rules and regulations established by City including, but not limited to, City’s Municipal Code provisions governing parks and compliance with the annual City business license tax.
C. During the term of this License, City shall retain the right to cause Licensee’s closure of the Premises for up to three (3) events per calendar year, with ninety (90) days prior written notice given to the Licensee for each such event.
D. The hours of operation for the Premises shall be limited to 11:00 a.m. to 2:00 a.m., Monday through Sunday.
E. Licensee shall designate an attendee to monitor the Premises between 9:00 p.m. and 2:00 a.m. to ensure security and maintenance of the Premises in accordance with this License.
F. Licensee shall ensure that all customers have vacated the Premises upon closure of The Cope House restaurant at 2:00 a.m.
G. Licensee shall provide adequate security for the Premises to ensure the safety of the public, which includes coordinating with City’s Police Department to provide officers, corporals, or sergeants on billed overtime status to work any event planned within the Premises, starting thirty (30) minutes prior to opening and for up to one hour after closing for each day of any planned event, or providing the same coverage using private security officers as approved by City.
H. The Premises shall not result in adverse effects to the health, welfare, peace or safety of persons visiting, residing, working, or conducting business in the surrounding area.
I. Licensee’s operations within the Premises shall not jeopardize or endanger the public health or safety or person visiting, residing, working, or conducting business in the surrounding area.
J. Licensee’s operation of the Premises shall not result in nuisance activities within the Premises or in close proximity of the Premises, including but not limited to disturbance of the peace, illegal drug activity, public drunkenness, drinking in public, harassment of passersby, gambling, prostitution, sale of stolen goods, public urination, theft, assaults, batteries, acts of vandalism, littering, loitering, graffiti, illegal parking, excessive loud noises especially in the late night or early morning hours, traffic violations, curfew violations, lewd conduct, or police detentions and arrests.
K. Licensee’s operation of the Premises shall comply with all provisions of state laws, regulations or orders of the State Department of Alcohol and Beverage Control, California Business and Professions Code sections 24200, 24200.6, and 25612.5, as well as any condition imposed on any permits issued pursuant to applicable laws, regulations or orders Redlands Regular Meeting 06-21-2022 474 of 1716
L. Licensee shall ensure that the Premises’ upkeep and operating characteristics are compatible with, and will not adversely affect, the livability or appropriate development of abutting properties and the surrounding neighborhood.
M. To the extent not already completed in connection with the prior license agreements, Licensee and all of Licensee’s employees of The Cope House restaurant shall complete an approved course in “Responsible Beverage Sales” or equivalent as approved by City, within sixty (60) days of hire. To satisfy this requirement, and pursuant to, the Responsible Beverage Service Training Act of 2017, AB 1221, on premise alcohol servers and their managers in California are required to attend a Responsible Beverage Service training from an ABC accredited trainer and pass an exam to be certified.
Section 7. As-Is Condition. Licensee accepts the Premises in its “as-is” condition as of the Effective Date of this License, without any warranty, express or implied.
Section 8. Maintenance of Premises. Licensee shall, at his own cost, maintain the Premises in good order and repair. City shall have the right to enter the Premises, at all reasonable times, for City’s inspection and maintenance purposes. Should an inspection disclose the need for maintenance or repairs, City shall provide Licensee with written notice of the items requiring repair or maintenance. If action is not taken on such items by Licensee within fifteen (15) days from the provision of such notice, City may enter the Premises and take whatever action is reasonable or necessary to perform such maintenance or repairs at Licensee’s expense.
Section 9. Improvements. Licensee shall not make any improvements to the Premises without the prior written consent of City; provided, however after making reasonable attempts to contact City for its approval, Licensee may undertake minor maintenance and repairs to the Premises which Licensee determines are immediately necessary to protect against imminent injury to persons or property. Within three (3) days of performing any minor maintenance or repairs not verbally approved by City, Licensee shall provide written notification to City of the same. All proposals for improvements to the Premises shall be submitted in writing to City for its consideration and prior approval. City shall approve or disapprove such proposals within twenty (20) days of their submission. Licensee shall have the right to remove all improvements made by Licensee to the Premises provided such removal result in no damage to Premises. Improvements not removed by Licensee shall, on expiration or earlier termination of this License, remain on the Premises and become the property of City.
Section 10. Indemnity. Licensee shall defend, indemnify and hold harmless City, and its elected officials, officers, employees and agents, from and against any and all claims, causes of action, damages and liability resulting from Licensee’s negligent acts or omissions, and willful misconduct of Licensee, and its officers, contractors, agents, employees, guests and invitees arising from Licensee’s occupation and use of the Premises or the improvements thereon during the term of this License. This section shall survive any termination or expiration of this License.
Section 11. Public Liability and Property Damage Insurance; Worker’s Compensation Insurance. Licensee shall maintain at its own cost for the term of this License, public liability and property damage insurance in the amount of one million dollars ($1,000,000) per occurrence and Redlands Regular Meeting 06-21-2022 475 of 1716
two million dollars ($2,000,000) in the aggregate, issued by an insurance company acceptable to City. Licensee shall provide City with a renewed certificate of insurance and endorsements showing City as an additional insured on the policy prior to January 6, 2022. Such insurance shall be primary with respect to City and non-contributory to any insurance or self-insurance maintained by City. The policy shall require that before amending or canceling the policy, the issuing insurance company shall give City at least thirty (30) days prior written notice. City and Licensee acknowledge and agree that the insurance required of Licensee is subject to annual review by City and subject to increases in the amount and scope of coverage, as reasonably determined by City.
Licensee shall procure and maintain Worker’s Compensation Insurance in such amount as will fully comply with the laws of the State of California, and which shall indemnify, insure and provide legal defense for both Licensee and City against any loss, claim or damage arising from injuries or occupational diseases happening to any worker employed by Licensee in, at or about the Premises.
Section 12. Assignment Prohibited. This License is personal to Licensee. Licensee shall not encumber, assign, sublease or otherwise transfer this License, or any right or interest therein, without the prior written consent of City. Any such encumbrance, assignment, sublease or transfer without such prior consent and approval of City shall constitute a breach of this License and may, notwithstanding any other provision of this License and at the sole discretion of City, result in the immediate termination of this License.
Section 13. Attorneys’ Fees. In the event any action is commenced to enforce or interpret the terms or conditions of this License, the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.
Section 14. Notices. Any notice or other communication required, or which may be given, pursuant to this License, shall be in writing. Any such notice shall be deemed delivered (i) on the day of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic email transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a party may provide notice of in accordance with this section:
CITY: LICENSEE:
City Clerk David Kramer, Owner
City of Redlands dba The Cope House
35 Cajon Street 19 E. Citrus Avenue, Suite 101
P.O. Box 3005 (mailing) Redlands, CA 92374
Redlands, CA 92373 [email protected]
[email protected] (909) 253-1400
(909) 798-7531
Redlands Regular Meeting 06-21-2022 476 of 1716
Section 15. Entire Agreement/Amendment. This License constitutes the entire agreement between the Parties with respect to the subject matter hereof. Any prior verbal or written representations or agreements respecting the Premises not expressly set forth herein are hereby deemed null and void. Any and all amendments to this License shall be in writing and executed by the Parties.
Section 16. Termination. In the event of any breach of this License by Licensee, in addition to any other rights or remedies City may have, City shall have the immediate right of reentry and may remove all property from the Premises. Such property may be removed and stored in a public warehouse or elsewhere at the cost of Licensee. Further, in the event of a breach of this License by Licensee, City shall have the option of immediately terminating this License. All remedies of City under this section shall be cumulative and in addition to any other legal or equitable rights and remedies which City may have.
Section 17. Hazardous Materials. Licensee agrees that it will not alow or permit the use, storage, disposal or release on or about the Premises other improvements thereon of any Hazardous Materials by its officers, agents, contractors, employees, guest or invitees. As used herein, “Hazardous Materials” means any flammable explosives, radioactive materials, asbestos, PCB’s, hazardous waste, toxic substances or any other “hazardous substances”, “hazardous materials” or “toxic substances” as defined in any present or future federal, state or local law applicable to Premises or the improvements thereon, and the rules and regulations adopted or promulgated under or pursuant to the foregoing laws.
Section 18. Breach and Default by Licensee.
A. All covenants and agreements contained in this License are declared to be conditions of this License, and to the term for which the Premises are licensed to Licensee.
B. Should Licensee fail to perform or comply with any covenant, condition or agreement contained in this License (a “Default”), which by its nature is reasonably and practically subject to cure, and the Default is not cured within fifteen (15) days after written notice of the Default is served on Licensee by City, then Licensee shall be in breach of this License.
C. If the default is one which the Parties determine requires more than fifteen (15) days to cure, Licensee commence action to cure within such fifteen (15) days and prosecute such cure diligently until completion within a reasonable time. Licensee’s failure to complete such cure within a reasonable time shall also constitute a default by Licensee.
D. The Parties acknowledge and agree that Licensee’s failure to perform or comply with any covenant, condition or agreement in this License may be of such a one-time nature that such a Default is not subject to cure (e.g. Licensee’s failure on a given day to abide by the hours of operation permitted by this License) (a “One-Time Default”). In such an event, City shall provide written notice to Licensee within five (5) business days of City’s knowledge and determination of the occurrence of a One-Time Default. City’s provision to Licensee of three such One-Time Default notices during the term of this License for Licensee’s failure to perform or comply with the same (or similar) covenant, condition or agreement contained in this License shall constitute a breach by Licensee of this License.
Redlands Regular Meeting 06-21-2022 477 of 1716
Section 19. Amendment; Waiver. No term or provision of this License may be amended, altered, modified or waived orally or by course of conduct, but only by an instrument in writing signed by a duly authorized officer or representative of each Party. No waiver by either Party of any provision of this License, or waiver of any breach of this License, shall be deemed to be a waiver of any other provision of this License, or of any subsequent breach by either Party of the same or any other provision of this License.
Section 20. Governing Law; Venue. This License is to be governed by and construed in accordance with the laws of the State of California, without regard to the principles of conflicts of laws. Any action by a party to this Agreement to enforce or interpret the terms hereof shall be maintained in the courts in San Bernardino County.
Section 21. Attorneys’ Fees. If either Party to this License brings an action to enforce the terms hereof or declare rights hereunder, the prevailing party in such action, on trial or appeal, shall be entitled to reasonable attorneys’ fees to be paid by the non-prevailing party as fixed by the court.
Section. 22. Counterparts. This License Agreement may be executed in counterparts, each of which is an original but all of which together constitute but one and the same instrument.
Section 23. Severability. If any particular provision of this License is held invalid or unenforceable for any reason by a court of competent jurisdiction, this License shall otherwise remain in full force and effect and shall be construed in all respects as if such invalid or unenforceable provision was omitted.
[Signatures on Next Page]
Redlands Regular Meeting 06-21-2022 478 of 1716
Executed on the 21st day of June, 2022, at Redlands, California
CITY OF REDLANDS THE COPE HOUSE
________________________________ ________________________________ Paul T. Barich, Mayor David Kramer, Owner
ATTEST:
________________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 479 of 1716
EXHIBIT “A”
THE “PREMISES”
[ATTACHED]
Redlands Regular Meeting 06-21-2022 480 of 1716
ORANGE STREET ALLEY
LICENSE AGREEMENTS ORANGE STREET 5th STREET
LEGEND
EXHIBIT 'A'
7' x 40' = 280 SQ.FT.
5' x 54' = 270 SQ. FT.
550 SQ. FT. TOTAL
CHEESEWALLA LICENSE AGREEMENT AREA
KRAMER LICENSE AGREEMENT AREA
5' x 54' = 270 SQ. FT.
Redlands Regular Meeting 06-21-2022 481 of 1716
City Council Meeting H. 18.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Approve an agreement with Three Peaks Corporation for bathroom and lobby improvements at the Redlands Municipal Airport in an amount not-to-exceed $70,048 and determine that the project is not subject to environmental review pursuant to Section 15301(d) of the State's guidelines implementing the California Environmental Quality Act (Assistant City Manager Boatman)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motions are provided:
I move that the City Council determine that approval of the agreement for bathroom and lobby improvements at the Redlands Municipal Airport is categorically exempt from environmental review in accordance with Section 15301(d) of the State's guidelines implementing the California Environmental Quality Act;
1. I move that the City Council approve an appropriation of funds in the amount of $10,000 from the 2021 State Entitlement Grant funds; and
2. I move that the City Council approve the agreement with Three Peaks Corporation in an amount not-to-exceed $70,048.
3. RECOMMENDATION:
Staff recommends that the City Council approve the agreement with Three Peaks Corporation in an amount not-to-exceed $70,048 for bathroom and lobby improvements at the Redlands Municipal Airport and further recommends that the City Council determine that the project is categorically exempt from environmental review in accordance with Section 15301(d) of the State's guidelines implementing the California Environmental Quality Act.
Redlands Regular Meeting 06-21-2022 482 of 1716
DISCUSSION:
The Redlands Municipal Airport and the main lobby is located at 1745 Sessums Dr. and is open twenty-four hours, seven days a week for airport-based tenants and visiting pilots. This same lobby and its restrooms are open to the public seven days a week from 8:00 a.m. to 5:00 p.m. The lobby is used by tenants, students, instructors, and visitors for private instruction, flight planning, and small group meetings. The bathroom facilities are over twenty years old and do not meet current ADA compliance, COVID-19 policies for touchless fixtures, nor include energy/water conservation measures. Funding for these upgrades come from two Federal Aviation Administration 2021 Grants (Airport Coronavirus Relief Grant Program in the amount of $13,000 and an Airport Rescue Grant in the amount of $32,000) and two State Entitlement grants 2020 and 2021 totaling $25,920; total amount of funds available for the project is $70,920. The key upgrades include refurbishment to flooring, painting walls, electrical upgrades (LED Lighting), low flow water toilets, and touchless fixtures.
On March 10, 2022, the City Clerk's office received and opened two bids to complete the lobby and bathroom improvements. Staff evaluated the bids for conformance with the purchasing ordinance and verified the total price as shown in the table below. Three Peaks Corporation met all the bidding requirements and was deemed the apparent lowest responsible and responsive bidder. The table below lists the bid amounts outlined in the City Clerk's Bid Opening Report.
Bidder Name and Location Bid Amount
Three Peaks Corporation, Calimesa, CA $70,048.00
Corner Keystone Construction, Walnut, CA $86,431.74
This project is categorically exempt from environmental review in accordance with Section 15301(d) as the proposed improvements constitute restoration to existing public facilities.
ALTERNATIVES:
City Council may reject all bids and direct staff accordingly.
STRATEGIC PLAN:
Supports Strategic priority D - Sustainability
Redlands Regular Meeting 06-21-2022 483 of 1716
SUBMITTED BY:
Chris Boatman, Assistant City Manager
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Kathleen Giorgianni, Senior Administrative Assistant
Fiscal Impact
Fiscal Year: 2021-2022
Appropriation Required Y/N: Yes
Amount: 10,000.00
Budgeted Y/N: Yes
Account No.: 564900
Discussion:
Funds in the amount of $70,048 from various grants are available to fund the project. The grants include two Federal Aviation Administration 2021 Grants (Airport Coronavirus Relief Grant Program in the amount of $13,000 and an Airport Rescue Grant in the amount of $32,000) and two State Entitlement grants 2020 and 2021 totaling $25,920. Funding for this project has been included in the Airport's budget (564910) except for the 2021 State Entitlement grant in the amount of $10,000.
Attachments
Clerk's Bid Report
Additional Appropriation
Agreement
Redlands Regular Meeting 06-21-2022 484 of 1716
Redlands Regular Meeting 06-21-2022 485 of 1716
Redlands Regular Meeting 06-21-2022 486 of 1716
PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this 21st day of June, 2022, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and Three Peaks Corporation (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:
1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: Redlands Airport Bathroom Remodel and Lobby Improvement Project, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s Redlands Airport Bathroom Remodel and Lobby Improvement Project – FCS02092022KG (the “Work”).
2. CONTRACT SUM: City shall pay Contractor the sum of seventy thousand forty-eight dollars ($70,048.) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.
3. TIME FOR COMPLETION: The Work shall be completed within thirty (30) calendar days from and after the date of City’s issuance of a Notice to Proceed to Contractor.
4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars ($500.) for each consecutive calendar day in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500.) per day is the estimated damage to City caused by the failure of the Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due the Contractor if such delay occurs.
5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).
6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.
7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy-five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Redlands Regular Meeting 06-21-2022 487 of 1716
Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.
8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.
9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.
10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.
11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.
Redlands Regular Meeting 06-21-2022 488 of 1716
IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.
CITY OF REDLANDS
(SEAL)
By:____________________________________
Paul T. Barich, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
__________________________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.
Redlands Regular Meeting 06-21-2022 489 of 1716
WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Facilities & Community Services Department
Redlands Airport Bathroom Remodel & Lobby Improvement Project FCS02092022KG
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.
CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.
I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.
Dated this day of , 2022.
_____________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)
Redlands Regular Meeting 06-21-2022 490 of 1716
FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and Three Peaks Corporation (hereinafter designated as "Principal") have entered into an agreement dated June 21, 2022 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as Redlands Airport Bathroom Remodel & Lobby Improvement Project and is hereby referred to and made a part hereof; and Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, Three Peaks Corporation, as Surety, are held and firmly bound unto the City in the penal sum of ________________________________ dollars ($_______________) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.
As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.
Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:
1. Complete the Work in accordance with its terms and conditions; or
2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall Redlands Regular Meeting 06-21-2022 491 of 1716
mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.
Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.
No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.
The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.
No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.
In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2022.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________
Redlands Regular Meeting 06-21-2022 492 of 1716
LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and Three Peaks Corporation (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated June 21,, 2022, and identified as Redlands Airport Bathroom Remodel & Lobby Improvement Project – FCS02092022KG is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, Principal is required before commending the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.
Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of ______________ dollars ($_____) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.
Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.
In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2022.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________
Redlands Regular Meeting 06-21-2022 493 of 1716
City Council Meeting H. 19.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Approve an agreement with Leafwise Landscape, LLC for Median Landscape Maintenance Services for city medians in an amount not-to-exceed $62,726.40 for a period of one year, with two additional one-year renewal options for a total amount
not-to-exceed $188,179.20 (Assistant City Manager Boatman) MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
I move to approve an agreement with Leafwise Landscape, LLC for Median Landscape Maintenance Services for city medians in an amount not-to-exceed $62,726.40 for a period of one year, with two additional one-year renewal options for a total amount not-to-exceed $188,179.20.
RECOMMENDATION:
Staff recommends that the City Council approve an agreement with Leafwise Landscape, LLC to provide landscape maintenance services, for all medians within the City's purview, in an amount not-to-exceed $62,726.40 for a period of one year, with two additional one-year renewal options for a total amount not-to-exceed $188,179.20.
DISCUSSION:
The Facilities and Community Services Department Parks Division oversee the routine maintenance of city medians which includes mowing, edging, weed whacking, blowing and various other maintenance services. The division utilizes outside contractual services to perform these services on an as-needed basis to ensure consistent maintenance and to allow staff to focus on more specialized tasks within the City's park system.
Redlands Regular Meeting 06-21-2022 494 of 1716
The City advertised the Request for Bid (RFB) for median landscape maintenance services on April 19, 2022. Two vendors responded and the results of the bid opening are as follows:
Bidder Bid Amount
Leafwise Landscape, LLC $62,726.40
RP Landscape & Irrigation $69,348.00
Staff evaluated the bid submittals for compliance with the scope of specifications requested per the RFB and conformance with the purchasing ordinance and Leafwise Landscape, LLC was determined to be the lowest responsible bidder.
Furthermore, staff recommends City Council award an agreement to Leafwise Landscape, LLC in the amount of $62,726.40 for a period of one year, with two additional one-year renewal options for a total amount not-to-exceed $188,179.20, to perform median landscape maintenance services.
ALTERNATIVES:
City Council may elect to direct staff to reject all bids and re-issue the request for bids.
STRATEGIC PLAN:
Supports Objective D - Sustainability
SUBMITTED BY:
Chris Boatman, Assistant City Manager
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Dana Abramovitz-Daniel, Procurement Manager
PREPARED BY:
Erik Reeves, Field Services Superintendent
Redlands Regular Meeting 06-21-2022 495 of 1716
Fiscal Impact
Fiscal Year: FY 2022-23
Amount: 62,726.40
Budgeted Y/N: Yes
Account No.: 101303-6710
Discussion:
Sufficient funding for this service is included in the Facilities and Community Services Department Parks Division budget for Fiscal Year 2022-23 as approved by the City Council. Costs associated with any future renewal terms of the agreement will be included in subsequent budget requests prepared by the Department. Contractual services for median landscape services for Fiscal Year 2021-22 was $63,562, which is a decrease of $835.60.
Attachments
A. Agreement with Leafwise Landscape
B. City Clerk Bid Opening Report
Redlands Regular Meeting 06-21-2022 496 of 1716
AGREEMENT TO PERFORM NON-PROFESSIONAL SERVICES
FOR IMPROVEMENT TO PUBLIC BUILDINGS AND GROUNDS
This agreement for the provision of median landscape maintenance (“Agreement”) is made and entered in this 21st day of June, 2022 (“Effective Date”), by and between the City of Redlands, a municipal corporation (“City”) and Leafwise Landscape, LLC, a California limited liability company (“Contractor”). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.” In consideration of the mutual promises contained herein, City and Contractor agree as follows:
ARTICLE 1 – ENGAGEMENT OF CONTRACTOR
1.1 City hereby engages Contractor to perform median landscape maintenance services for City (the “Services”). The Services that Contractor shall perform are more particularly described in Exhibit “A,” titled “Scope of Services,” which is attached hereto and incorporated herein by this reference.
1.2 The Services shall be performed by Contractor in a professional manner, and Contractor represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional Contractors in the industry providing like and similar types of Services.
ARTICLE 2 – RESPONSIBILITIES OF CONTRACTOR
2.1 Contractor shall comply with all applicable federal, state and local laws and regulations in the performance of the Services including, but not limited, to all applicable Labor Code and prevailing wage laws and non-discrimination laws, including the Americans with Disabilities Act. Pursuant to Labor Code section 1773.2, copies of the prevailing rates of per diem wages as determined by the Director of the California Department of Industrial Relations for each craft, classification or type of worker needed to undertake the Services are on file at City’s Municipal Utilities and Engineering Department, located at the Civic Center, 35 Cajon Street, Suite 15A (Mailing: P.O. Box 3005), Redlands, California 92373.
2.2 Contractor acknowledges that if it violates the Labor Code provisions relating to prevailing wages that City may enforce such provisions by withholding payments to Contractor or its subcontractors pursuant to Labor Code section 1771.6.
2.3 If Contractor executes an agreement with a subcontractor to perform any portion of the Services, Contractor shall comply with Labor Code sections 1775 and 1777.7, and shall provide the subcontractor with copies of the provisions of Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Contractor acknowledges that the statutory provisions establishing penalties for failure to comply with state wage and hour laws and to pay prevailing wages may be enforced by City pursuant to Labor Code sections 1775 and 1813.
2.4 Contractor and its subcontractors shall comply with the provisions of Labor Code section 1776 regarding payroll records maintenance, certifications, retention and inspection.
2.5 Contractor acknowledges that eight (8) hours constitutes a legal day’s work pursuant to Redlands Regular Meeting 06-21-2022 497 of 1716
Labor Code section 1810.
2.6 Contractor shall comply with the provisions of Labor Code section 1777.5 as to apprenticeships, and Labor Code sections 1771, 1775, 1776, 1777.5, 1813 and 1815.
2.7 Pursuant to Public Contract Code section 7103.5(b), Contractor offers and agrees to assign to City all rights, title and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. section 15) or under the Cartwright Act (Chapter 2 (commencing with section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, goods or materials pursuant to this Agreement.
ARTICLE 3 – RESPONSIBILITIES OF CITY
3.1 City shall make available to Contractor information in its possession that may reasonably assist Contractor in performing the Services.
3.2 City designates Chris Boatman, Assistant City Manager, as City’s representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City’s policies and decisions with respect to performance of the Services.
ARTICLE 4 – PERFORMANCE OF SERVICES
4.1 Contractor shall perform and complete the Services in a prompt and diligent manner in accordance with the schedule set forth in Exhibit “A,” which is attached hereto and incorporated herein by this reference.
4.2 The term of this Agreement shall be for a period of one (1) year from the Effective Date of this Agreement (the “Initial Term”). The City shall have the option to extend the Initial Term of this Agreement by two (2) additional one-year terms (each, an “Extended Term”), on the same terms and conditions, by providing written notice to Contractor at least thirty (30) days prior to the expiration of the Initial Term or any Extended Term. The Initial Term and the Extended Terms are hereby collectively, referred to herein as the “Term” of this Agreement.
ARTICLE 5 – PAYMENTS TO CONTRACTOR
5.1 The compensation for Contractor’s performance of the Services shall not exceed the amount of sixty-two thousand seven hundred twenty-six dollars and forty cents ($62,726.40) for the Services provided during the Initial Term. Should this Agreement be renewed, the compensation for Contractor’s performance for the Services shall not exceed the amount of sixty two thousand seven hundred twenty six dollars and forty cents ($62,726.40) for the first Extended Term; and sixty two thousand seven hundred twenty six dollars and forty cents ($62,726.40) for the second Extended Term, bringing the total possible amount of compensation to a not-to-exceed amount of sixty two thousand seven hundred twenty six dollars and forty cents ($62,726.40). For the Initial Term and each Extended Term, City shall pay Contractor on a time and materials basis up to the not to Redlands Regular Meeting 06-21-2022 498 of 1716
not-to-exceed amount in accordance with the rates specified in Exhibit “C,” titled “Price and Fee Bid,” which is attached hereto and incorporated herein by reference.
5.2 Contractor shall submit monthly invoices to City describing the Services performed during the preceding month. Contractor’s invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom.
City shall pay Contractor no later than thirty (30) days after receipt and approval by City of Contractor’s invoice.
5.3 Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:
CITY CONTRACTOR
City Clerk Jovani Lemus, President
City of Redlands Leafwise Landscape, LLCtor
35 Cajon Street 25691 San Lupe Ave
P.O. Box 3005 (mailing) Moreno Valley, CA 92551
Redlands, CA 92373 [email protected]
[email protected] 951-214-3839
(909) 798-7531
ARTICLE 6 – INSURANCE AND INDEMNIFICATION
6.1 The following insurance coverage required by this Agreement shall be maintained by Contractor for the duration of its performance of the Services. Contractor shall not perform any Services unless and until the required insurance listed below is obtained by Contractor.
Contractor shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City.
A. Workers’ Compensation and Employer’s Liability insurance in the amount that meets statutory requirements with an insurance carrier acceptable to City, or certification to City that Contractor is self-insured or exempt from the workers’ compensation laws of the State of California. Contractor shall execute and provide City with Exhibit “C,” titled “Workers’ Compensation Insurance Certification,” which is attached hereto and incorporated herein by this reference, prior to performance of the Services.
B. Comprehensive General Liability insurance with carriers acceptable to City in the Redlands Regular Meeting 06-21-2022 499 of 1716
minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate, for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City.
C. Business Auto Liability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Contractor owned vehicles used in connection with Contractor’s provision of the Services, hired and non-owned vehicles, and employee non-ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or selfinsurance maintained by City.
6.2 Contractor shall defend, indemnify, and hold harmless City and its elected and appointed officials, employees and agents from and against any and all claims, losses and liability, including attorneys’ fees, arising from injury or death to persons or damage to property occasioned by any negligent act or omission by, or the willful misconduct of, Contractor, or its officers, employees and agents in performing the Services.
ARTICLE 7 – CONFLICTS OF INTEREST
7.1 Contractor covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any manner or degree by the performance of Contractor’s Services. Contractor further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement.
7.2 Contractor agrees it is not a designated employee within the meaning of the Political Reform Act because Contractor:
A. Does not make a governmental decision whether to:
(i) approve a rate, rule or regulation, or adopt or enforce a City law; (ii) issue, deny, suspend or revoke any City permit, license, application, certification, approval, order or similar authorization or entitlement; (iii) authorize City to enter into, modify or renew a contract; (iv) grant City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) grant City approval to a plan, design, report, study or similar item; (vi) adopt, or grant City approval of, policies, standards or guidelines for City or for any subdivision thereof.
B. Does not serve in a staff capacity with City and in that capacity, participate in making a governmental decision or otherwise perform the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City’s Conflict of Interest Code under Government Code section 87302.
Redlands Regular Meeting 06-21-2022 500 of 1716
7.3 In the event City determines that Contractor must disclose its financial interests, Contractor shall complete and file a Fair Political Practices Commission Form 700, Statement of Economic Interests, with the City Clerk’s office pursuant to the written instructions provided by the City Clerk.
ARTICLE 8 – GENERAL CONSIDERATIONS
8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys’ fees, including fees for the use of inhouse counsel by a Party.
8.2 Contractor shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms and conditions of this Agreement. Any assignment or attempted assignment without such prior written consent may, in the sole discretion of City, results in City’s immediate termination of this Agreement.
8.3 Contractor is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor. Neither City nor any of its agents shall have control over the conduct of Contractor or Contractor’s employees, except as herein set forth. Contractor shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Contractor are for its account only, and in no event shall Contractor or personnel retained by it be deemed to have been employed by City or engaged by City for the account of, or on behalf of City. Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Contractor have any authority, express or implied, to bind City to any obligation.
8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less than five (5) days prior written notice to Contractor of City’s intent to terminate. If this Agreement is terminated by City, an adjustment to Contractor’s compensation shall be made, but (i) no amount shall be allowed for anticipated profit or unperformed Services, and (ii) any payment due Contractor at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Contractor. Upon receipt of a termination notice, Contractor shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of project related data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Contractor in performing the Services. Contractor shall be compensated on a pro-rata basis for Services completed up to the date of termination.
8.5 Contractor shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor pursuant to this Agreement. Such books shall be available at reasonable times for examination by City at the office of Contractor.
Redlands Regular Meeting 06-21-2022 501 of 1716
8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, any amendment to this Agreement shall be in writing, approved by City and signed by City and Contractor.
8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflicts of laws provisions. The Parties agree that all actions or proceedings arising in connection with this Agreement shall be tried and litigated only in the state courts located in San Bernardino County, California, and the federal courts located in Riverside County, California.
8.8 If one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement.
IN WITNESS WHEREOF, duly authorized representatives of City and Contractor have signed in confirmation of this Agreement.
CITY OF REDLANDS LEAFWISE LANDSCAPE, LLC
By: ___________________________ By: _________________________ Paul T. Barich, Mayor Jovani Lemus, President
ATTEST:
___________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 502 of 1716
EXHIBIT "A"
SCOPE OF SERVICES
Landscape maintenance services shall be performed to industry standards and shall keep the designated areas maintained at a high level of quality, aesthetics, safety, and the municipal code of Redlands. Please see attached Contractor Safety Program.
Specifications listed below include:
1. SITE INSPECTIONS
Performed at least twice per month by a Supervisor who can communicate accurately to City Staff results of evaluation. Supervisor must be able to competently inspect and evaluate aesthetics and health of all overseen areas. Results of inspections must be emailed to City Staff on a monthly basis with all observations and/or concerns included in correspondence.
2. PLANT MATERIAL MAINTENANCE
A. Ground Cover: Ground cover shall be trimmed to keep plant material clear of curbs, hardscapes, trees, edges, structures, and other miscellaneous objects. It shall be trimmed to maintain the ground cover at an appropriate height according to the specific species and recommendations of City Staff.
B. Shrubs: Shrubs shall be trimmed and maintained to keep the natural shape of the specific species. Pruning of dead or diseased branches shall be done accordingly. Pruning and trimming shall be performed at the time of year to maximize aesthetics.
3. IRRIGATION
A. Inspection: Irrigation systems shall be cycled and inspected for proper operation and coverage on a monthly basis by competent staff. Proper adjustments to sprinkler nozzle heads, emitters, and drip lines to maximize efficiency of system shall be performed monthly.
B. Repairs: Any repairs required shall be reported to City Staff with a 24-hour period of discovery by Contractor. Repairs to irrigation shall be considered extra work and must be submitted via quote to appropriate City Staff for approval prior to any extensive work being performed.
4. WEED ABATEMENT
All site locations including surrounding concrete sidewalks, curbing, sign/monument bases, pathways and hardscapes shall be kept free of weeds and unwanted growth. Proper techniques and products shall be used when applying pesticides. Applicators shall adhere to all State and Local regulations including those set forth by the California Department of Pesticide Regulation.
5. FERTILIZING
Plant and grass applicable fertilizing to be applied twice per year at the appropriate intervals, as designated by City Staff. All excess fertilizer on hardscapes, streets, etc. shall be removed and disposed of as appropriate.
Redlands Regular Meeting 06-21-2022 503 of 1716
6. CLEAN UP
A. All debris and trash shall be removed and properly disposed of at each service visit.
B. Clippings, trimmings, and all other debris resulting from maintenance shall be removed each time areas are serviced.
C. Curbs, gutters, walkways, etc., shall be blown or swept after each visit and resulting debris is not to be blown or swept into public property (streets, roadway, storm drain culverts, storm drain inlets, etc.).
TURF GRASS MOWING
Mowing height for all turf grass areas shall be no less than 1.5” and shall not exceed 2.5” during the months of November to April. Through the months of May to October turf grass shall be mowed at a height of 3.5” to 4.5”. The turf shall be cut at a uniform height leaving no scalping or uneven cuts. Trash and debris shall be cleaned up prior to each mowing. All areas in need of trimming such as turf grass, and ground cover shall be mechanically trimmed as specified in the service schedule. Trimming shall be performed around all road signs, park posts, trees, shrubs, utility posts, fencing, and all other obstacles taking special care to not cause any damage.
Grass shall be trimmed at height corresponding with specifications determined by the mowing schedule. Walks and pathways shall be blown off once mowing is completed. This shall be performed in all locations where mowing is performed immediately adjacent to sidewalk and/or pathways. Frequency of mowing schedules shall ultimately be determined by city staff per the specific conditions present during various months/seasons of the year (e.g. prolonged winter or summer conditions, drought mandated water schedules, etc.) but shall not exceed 40 in total quantity per fiscal year.
IRRIGATION MAINTENANCE AND REPAIR
Repair and/or replacement of any damaged/missing irrigation components that is a direct result of the contractual mowing, shall be the onus of the contractor. Any repair/replacement work exceeding a cost of $500.00 shall be submitted to the City for approval prior to said work being performed or parts being purchased. Any replacement parts pertaining to the irrigation system shall be the same make to match with existing components specific to the location: i.e.: Hunter, Rain Bird, Superior, Sch 40 PVC fittings and pipe, etc.
Redlands Regular Meeting 06-21-2022 504 of 1716
EXHIBIT "B"
PRICE AND FEE BID
Item # Description Unit Amount
A1 Redlands Blvd. from Fern Street to Ford Street
(5 Medians) Per Month $475.20
B1 Redlands Blvd. at Alabama Street (4 Medians) Per Month $475.20 C1 The Terrace from 6th Street to Church Street Per Month $475.20 D1 West State Street Medians Per Month $475.20
E1 Orange Blossom Trail West Per Month $475.20
F1 Orange Blossom Trail East Per Month $475.20
G1 Laramie Park & Zanja Trail Per Month $475.20
H1 Lincoln Park Per Month $475.20
I1 California Street Medians Per Month $475.20
J1 Eureka Street Medians Per Month $475.20
K1* Downtown Gateway Per Month $475.20
For Item K1 contractor shall obtain their own Caltrans Encroachment Permit. City has existing permit and contractor may “piggyback” off of City’s parent permit.
Additional as-needed Hourly Services
Monday through Friday
7:30 AM to 5:30 PM
Description Hourly Rate
Irrigation Repairs – all location $60.00
Replanting Shrubs $20.00
Replanting Trees $30.00
Redlands Regular Meeting 06-21-2022 505 of 1716
EXHIBIT “C”
WORKERS’ COMPENSATION INSURANCE CERTIFICATION
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.
CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.
I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.
LEAFWISE LANDSCAPE, LLC
By: Date: _______ __________
Jovani Lemus, President
Redlands Regular Meeting 06-21-2022 506 of 1716
Redlands Regular Meeting 06-21-2022 507 of 1716
City Council Meeting H. 20.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Approve a request to hold the Redlands Oktoberfest event hosted by the Redlands Optimist Club from October 1, 2022 through October 2, 2022, within Sylvan Park; approve a request for in-kind support in the amount of $11,318 related to the event; authorize the sale and consumption of alcoholic beverages at the event; and determine that the event is categorically exempt from environmental review pursuant to Section 15061 (b)(3) of the State’s guidelines implementing the California Environmental Quality Act (Assistant City Manager Boatman)
MOTION(S):
If the City Council determines that staff's recommendation is appropriate, the following motions are provided:
I move that City Council determine the Redlands Oktoberfest event is categorically exempt from environmental review pursuant to Section 15061 (b)(3) of the State’s guidelines implementing the California Environmental Quality Act;
1. I move to authorize and approve a request for in-kind support in the amount of $11,318 related to this event; and
2. I move to authorize the sale and consumption of alcoholic beverages for the Redlands Optimist Club to be held on October 1, 2022, and October 2, 2022, at Sylvan Park.
3. RECOMMENDATION:
Staff recommends that the City Council determine that the event is categorically exempt from environmental review pursuant to Section 15061 (b)(3) of the State’s guidelines implementing the California Environmental Quality Act, that the City Council direct staff accordingly concerning the request for in-kind Redlands Regular Meeting 06-21-2022 508 of 1716
support, and authorize the sale and consumption of alcoholic beverages during the Redlands Optimist Club's Oktoberfest event.
DISCUSSION:
The Facilities and Community Services Department manages the administration and issuance of permits for special events held in public areas of the City. Upon the issuance of a special event permit, the event may take place contingent on the event organizer paying the required fees. The City recognizes the value of partnering with non-profit agencies and organizations to provide services beneficial to the community. Therefore, in an effort to provide support for programs that provide a community benefit, the City Council will, from time to time, consider the authorization of the expenditure of city resources related to a specific special event without reimbursement from non-profit agencies and organizations.
The Redlands Optimist Club (Optimist Club) has reserved Sylvan Park on Saturday, October 1st and Sunday, October 2nd of 2022 for the Redlands Oktoberfest event. This is the first year that the Optimist Club is hosting the event over a two-day period. The Optimist Club is requesting permission to serve alcohol at the event that will end no later than 7:00 p.m. on Saturday and Sunday. The Optimist Club is requesting in-kind support and departmental resources including personnel and equipment from the Police, Development Services, and Facilities and Community Services Departments. The Optimist Club is a registered non-profit organization operating out of the City of Redlands. The City Council has waived fees for this event in the past as it serves as a public benefit to the community by promoting economic development and tourism within the community.
The Optimist Club will be responsible for operating and obtaining the daily license to serve alcohol from the Office of Alcohol Beverage Control. City Council approval is also necessary to authorize the consumption of alcohol for this event due to its location. Staff's approval authority is limited to only enclosed public areas in public parks as defined by Resolution No. 7559, and therefore the approval of this request is outside of the staff's purview. Should City Council approve the consumption of alcohol, staff will coordinate the distribution of receptacles to collect all recyclable material generated from the event.
The event is categorically exempt from the requirements of the California Environmental Quality Act’s guidelines pursuant to Section 15061 (b)(3). This section includes the permitting of existing public facilities involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. The request is consistent with this exemption as it includes permitting within an existing public park for a temporary event.
Redlands Regular Meeting 06-21-2022 509 of 1716
ALTERNATIVES:
The City Council may deny the request to hold the event, the request for in-kind support or provide alternative direction to staff.
STRATEGIC PLAN:
Supports Strategic Plan Priority A: Quality of Life - Strategic Objective 1:
Beautification, Arts and Culture
SUBMITTED BY:
Chris Boatman, Assistant City Manager
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Christopher R. Catren, Chief of Police
PREPARED BY:
Larry Alms, Administrative Assistant II
Fiscal Impact
Fiscal Year: FY 2022-23
Amount: $11,318
Discussion:
In anticipation of the City Council's consideration of this request, staff has compiled the following table outlining costs related to fees established by resolution of the City Council and departmental charges pertaining to personnel and equipment resources necessary for the support of the event. The departmental charges are costs outside of normal city operations that would not be incurred by the City if the special event was not taking place.
Redlands Regular Meeting 06-21-2022 510 of 1716
Departmental Charges
(Personnel & Equipment)
2022 Amount Type 2021 Amount
Police Personnel1 $8,496.00 Hard Cost $4,248.00
FCS Personnel1 $2,400.00 Hard Cost $1,200.00
Plan Review and Inspection1 N/A Hard Cost $383.10
Personnel & Equipment
Subtotal
$10,896.00 $5,831.10
Fees Established by City
Council Resolution
Sylvan Park Reservation Permit $422.00 Soft Cost $251.00 Fees Subtotal $422.00 $251.00
Total Departmental Charges
and Fees
$10,896.00 (hard)
$422.00(soft)
$11,318.00(Total)
$6,082.10
1Personnel costs are calculated conservatively assuming the highest staff cost scenario. Actual costs may vary on the day of the event based on the actual staff present. Actual costs will be confirmed following the event and will be included in a reconciliation report presented to the City Council.
The following table summarizes the total estimated costs associated with the use of City resources and in-kind support approved for events scheduled during Fiscal Year 2022-23 to date:
TABLE 2: FY 2022-23 Fee Waivers to date
Hard Costs Soft Costs Deposits
Refunded
In-kind support
Amount
Net
Amount
$78,361.00 $1,680.00 $800.00 $80,841.00 $80,041.00
Attachments
A. In-Kind Support Request
B. Authorization to Serve Alcohol
C. Verification of Nonprofit
Redlands Regular Meeting 06-21-2022 511 of 1716
Redlands Regular Meeting 06-21-2022 512 of 1716
Redlands Regular Meeting 06-21-2022 513 of 1716
Redlands Regular Meeting 06-21-2022 514 of 1716
Other Names
Publication 78 Data
Organizations eligible to receive tax-deductible charitable contributions. Users may rely on this list in determining deductibility of their contributions.
On Publication 78 Data List: Yes
Deductibility Code: PC
Form 990-N (e-Postcard)
Organizations who have filed a 990-N (e-Postcard) annual electronic notice. Most small organizations that receive less than $50,000 fall into this category.
Tax Year 2018 Form 990-N (e-Postcard)
Tax Year 2017 Form 990-N (e-Postcard)
Tax Year 2016 Form 990-N (e-Postcard)
Tax Year 2015 Form 990-N (e-Postcard)
HELP MENU
Home Tax Exempt Organization Search Redlands Optimist Club Foundation Inc.
Back to Search Results
Redlands Optimist Club Foundation Inc.
EIN: 33-0704935 | Redlands, CA, United States
Details about Redlands optimist club foundation inc. https://apps.irs.gov/app/eos/detailsPage?ein=330704935&name=Redlan... 1 of 2 8/3/2021, 3:45 PM
Redlands Regular Meeting 06-21-2022 515 of 1716
City Council Meeting I. 1.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Video: Fireworks Safety (Fire Chief Sessler)
DISCUSSION:
This year, our city leaders have decided on a location and provided funding for an amazing show. This year’s 4 th of July celebration will be held at the Moore Middle School. There will be plenty of room in the grass areas for families to gather, set up chairs and blankets, and enjoy dinner together. The Redlands 4th of July Committee is currently selling tickets for the event which are available in the City Clerk's Office. The show will begin once the skies are dark enough for the backdrop needed for an amazing show!
We also wanted to provide our community with some responsible tips for this holiday season. Personal fireworks use in Redlands is illegal. This is for your safety and the safety of others. Every year during 4th of July season, fireworks account for a large number of serious injuries, large wildfires and expensive damage to property. Our message today is to help prevent this as best as possible. Let’s leave the fireworks to the pros and enjoy an amazing firework show at Moore Middle school!
Remember, personal fireworks possession is punishable by fine and/or arrest.
This is an exciting time of year and with the ability for people to gather in greater numbers, let’s all get together at the celebration at Moore and enjoy some fireworks together! Please stay safe this holiday season and don’t play with fireworks.
SUBMITTED BY:
Janice McConnell, Assistant City Manager
REVIEWED BY:
Charles M. Duggan, Jr., City Manager
Carl Baker, Public Information Officer
Redlands Regular Meeting 06-21-2022 516 of 1716
Redlands Regular Meeting 06-21-2022 517 of 1716
City Council Meeting I. 2.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Presentation by Accelerate Neighborhood Climate Action on the work the organization is doing within the City of Redlands in relation to the effects of climate change (Mayor Pro Tem Tejeda) DISCUSSION:
For this evening's City Council meeting Linda Hamilton, Coordinator for the Redlands Accelerate Neighborhood Climate Action chapter, will be presenting on the work the organization is doing within the City of Redlands in relation to the effects of climate change.
Attachments
ANCA Summary Presentation
Redlands Regular Meeting 06-21-2022 518 of 1716
ANCA
Summary
Presentation Accelerate
Neighborhood
Climate Action
Speakers’ Series
by Linda Hamilton, Redlands Coordinator
Redlands Regular Meeting 06-21-2022 519 of 1716
Redlands Regular Meeting 06-21-2022 520 of 1716
Local Impacts of Climate Change
Increasing heat
Water shortages
Coming food shortages
Increasing health
issues
Rising costs for basics
like water, energy, food
More homelessness—
much more
Redlands Regular Meeting 06-21-2022 521 of 1716
ANCA: Building resilient communities
neighborhood-by-neighborhood
Raising awareness of climate
change & the need for action NOW.
Educating in key areas such as solar,
water saving, turf removal, health,
etc.
Mobilizing neighborhoods to:
o Prepare for climate impacts
o Reduce CO2 emissions
Redlands Regular Meeting 06-21-2022 522 of 1716
Results of Climate
Action Series
Reached 150 people
30 new volunteers
Neighborhoods Identified
New partners
Esri Hub
Monthly educational event
Redlands Regular Meeting 06-21-2022 523 of 1716
Demonstration
Neighborhood
Forum
Climate Change
Overview
Visioning
Helps & Hindrances to
Success
Action Plans
Redlands Regular Meeting 06-21-2022 524 of 1716
Suggestions for Supporting
Neighborhood Climate Action Plans
Provide incentives, support for:
landscape conversions for
removing turf and planting
drought tolerant landscape
installing solar
planting trees
residential composting
community gardens.
Redlands Regular Meeting 06-21-2022 525 of 1716
City Council Meeting I. 3.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Discussion and possible action relating to the cancellation of the August 2 and August 16, 2022, regular meetings of the City Council (Mayor Barich)
MOTION:
I move to approve the cancellation of the August 2 and August 16, 2022, regular meetings of the City Council.
DISCUSSION:
With City Council concurrence, I recommend the cancellation of the August 2 and August 16, 2022, regular meetings of the City Council. As the Council is aware, regular meetings in August have been canceled to allow Council Members and staff the opportunity to vacation or take time off with their families. Staff will work diligently to bring forward the necessary agenda reports to the meeting of July 19, 2022; therefore, staff believes there will be no impact or delay in City matters by the cancellation of the August 2 and August 16, 2022, regular meetings of the City Council.
The next regular meeting will be held on September 6, 2022.
SUBMITTED BY:
Mayor Paul T. Barich
Redlands Regular Meeting 06-21-2022 526 of 1716
City Council Meeting I. 4.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Discussion and possible action to fly a Pride Flag at City Hall during the month of June in honor of Pride Month and direction to staff to revise the City's flag policy (City Council Member Davis) MOTION:
If the City Council concurs with Council Member Davis, the following motions are provided:
1. I move to approve the flying of the Pride flag during the month of June.
2. I move to direct staff to revise the City's flag policy.
DISCUSSION:
At the request of Council Member Davis, this item has been added to the agenda to discuss the Pride Flag and having it flown at City Hall during the month of June in honor of Pride month. Since the City's current flag policy does not include the Pride Flag in the "other flags" that can be flown, Council Member Davis is seeking approval to direct staff to revise the City's flag policy to allow such ability during the month of June. A copy of Resolution No. 6633 establishing a display policy for the United States, State, City and other flags is attached for the City Council's reference.
Attachments
Resolution No. 6633
Redlands Regular Meeting 06-21-2022 527 of 1716
RESOLUTION NO. 6633
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
REDLANDS ESTABLISHING A DISPLAY POLICY FOR THE
UNITED STATES, STATE, CITY AND OTHER FLAGS
WHEREAS, in honor of the nation, and in recognition of state and local government, the City of Redlands regularly displays flags on and around City facilities; and
WHEREAS, rules and customs pertaining to the display and use of the United States flag have been established by Executiv e Order of the federal government for use by civilians and civilian groups and organi/ations; and WHEREAS, it is the desire of the City Council of the City of Redlands ("this City Council") that all City departments use and display the United States flag in accordance with such established rules and customs; and
WHEREAS, over two thousand Americans, six hundred fifty from this state, who served in the United States armed forces during the war in Indochina are still listed as prisoners of war or missing in action; and
WHEREAS, this nation is deeply indebted to its servicemen and servicewomen of all wars and conflicts for their courage and sacrifice, and should demonstrate its special commitment to the missing men, women and their families by obtaining the release of those still held prisoner of war and the fullest possible accounting from the responsible governments regarding those Americans listed as missing in action; and WHEREAS, the Prisoner of War/Missing in Action (POW/MIA) flag is a powerful syrnbol of the plight of these prisoners of war and missing Americans and reminds the public of the commitment this nation must have in determining the fate of its servicemen and servicewomen; and
WHEREAS, this City Council has determined it is appropriate that the POW/l\lL\ flag should be displayed at certain public buildings throughout the City to increase public aw areness of the issue of prisoners of w ar and those missing in action and to gain publie support for the efforts of the United States gov ernment to resoh e this matter; and \VHEREAS. it is further the desire of this City Council to adopt a written policy for the display and use of the United States flag. state and local flags and other flags; DJM\Reso\Draft Flag Policy
Redlands Regular Meeting 06-21-2022 528 of 1716
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Redlands hereby adopts the Display Policy for the United States, State, City and other flags attached hereto as Exhibit "A."
ADOPTED, SIGNED AND APPROVED this 4th day of September 2007.
Mpfor of the CÍ'tÿ of Redlands
ATTEST:
C f Clerk
I, Lorrie Poyzer, City Clerk of the City of Redlands, hereby certify that the foregoing resolution was adopted by the City Council at a regular meeting thereof, held on the 4th day of September, 2007 by the following vote:
AYES: Councilmembers Gilbreath, Gil, Gallagher, Aguilar; Mayor Harrison NOES: None
ABSTAIN: None
ABSENT: None
CityCiçr
DJM\Reso\Draft Flag Policy
Redlands Regular Meeting 06-21-2022 529 of 1716
EXHIBIT "A"
CITY OF REDLANDS DISPLAY POLICY FOR THE
UNITED STATES, STATE, LOCAL AND OTHER FLAGS
Any City department displaying the United States Flag and/or other flag subject to this policy on any City building or grounds shall comply with this policy.
It is proper to display the United States Flag from sunrise to sunset during business hours at each City facility when weather permits. The flag may also be displayed at night if illuminated by a light.
The flag should be raised briskly and lowered slowly and ceremoniously.
When on display, the flag is accorded the place of honor, always positioned to its own right. Place it to the right of the speaker or staging area or sanctuary. Other flags should be to the left.
The United States Flag should be at the center and at the highest point of the group when a number of flags of states, localities or societies are grouped for display.
When one flag is used with the United States Flag and the staffs are crossed, the flag of the United States Flag is placed on its own right with its staff in front ofthe other flag.
When displaying the flag against a wall, vertically or horizontally, the flag's union (stars) should be at the top, to the flag's own right, and to the observer's left.
POLICY ON DISPLAYING OTHER FLAGS
The Redlands City Council acknowledges the POW \11A dag is a powerful symbol of the plight of prisoners of war and missing Americans and reminds the public of the commitment this nation must have in determining the fate of its servicemen and servicewomen. On \ugust 10. læn. the 101 Congress passed U.S. Public I aw 101- which recogni ed the POW \ll:\ Hag and designated it "as the symbol of our Nation's concern and commitment to resolving as fullv as possible the fates of Americans still prisoner. missing and unaccounted for in Southeast :\sia. thus ending the uncertainty for their families and the Nation. '
Thus. it is appropriate that the POW/MIA flag should
be displayed at public buildings throughout this City. during daily normal business hours at each City facility when ueather permits. to increase public awareness of the issue of prisoners of war and those missing in action and to gain public support for the efforts 01 the i:nited States government to resolv e this matter.
In flying the flag from one flag pole, the POW/MIA flag is flown directly below the United States flag and above any state flag.
DJM\Reso\Draft Flag Policy
Redlands Regular Meeting 06-21-2022 530 of 1716
If Dying the United States flag, POW/MIA and State flags from two poles, the POW/MIA flag should be flown from the same pole as the United States flag, with the state flag flying from the pole to the left.
If flying flags from three poles, the National Colors occupy the place of prominence (the right), with the POW/MIA flag immediately to the left of the United States flag, and the state flag to the left of the POW/MIA flag.
POLICY ON DISPLAYING THE FLAG AT HALF STAFF
All City departments shall display the flag(s) at half staff at City buildings and grounds where flags are normally displayed in accordance with this policy.
By Public Law 322, 103M Congress, approved September 13, 1994 states, "...by order of the President, the flag shall be flown at half staff upon the death of principal figures of the United States government and the Governor of a State, territory, or possession, as a mark of respect to their memory. In the event of the death of other officials or foreign dignitaries, the flag is to be displayed at half staff according to Presidential instructions or orders, or in accordance with recognized customs or practices not inconsistent with law.
In the event of the death of a present or former official of the government of any State, territory, or possession, the Governor of that State, territory, or possession may proclaim that the United States flag shall be flown at half staff. The flag shall be flown at half staff thirty days from the death of the President or a former President; ten days from the death of the Vice-President, the Chief Justice or a retired Chief Justice of the United States, or an Associate Justice of the Supreme Court, or the Speaker of the House of Representatives; from the day of death until internment of an Associate Justice of the Supreme Court, a Secretary of an executive or military department, a former VicePresident, or Governor of a State, territory, or possession; and on the day of death and the following day for a member of Congress.
Display of Flag at half staff in Honor of Deceased Person The flags of the United States, the State of California and the City of Redlands may be noun at half staff upon the death of public officials at all levels of government. When death of the public ohicial to be so honored is veri ed, nags shall be Down at half staff immediately. The nags shall remain at half stalT during each day they are normally flown until lowered at the end of the dav on w hich the funeral is solemni/ed.
On occasions where public safety personnel are killed in the line of duty, the Redlands Citv Council may deem it appropriate to order all Hags Goun at half staff. Finally, the honor and reverence accorded this solemn act should not he diminished by the display of the flag at half staff on occasions of local tragedy.
DJM\Reso\Draft Flag Policy
Redlands Regular Meeting 06-21-2022 531 of 1716
METHOD FOR PLACING FLAG AT HALF STAFF
The flag shall be raised to the peak for an instant and then lowered to the half staff position midway between the top and the bottom of the staff. The flag should be again raised to the peak before it is lowered for the day. The flag must never touch the ground when being raised or lowered. The flag should be raised briskly and lowered slowly and ceremoniously. At no time shall any other flag be above the United States Flag. When the United States Flag is lowered to half staff position, other flags should similarly be lowered.
WHEN TO DISPLAY FLAG AT HALF STAFF
Memorial Day
The flags of the United States, the State of California and the City of Redlands are flown at half staff until 12:00 noon, and raised to the peak for the remainder of the day. This is covered by Public Law 829 passed by the 77* Congress. The flags of the United States, the State of California and the City of Redlands shall be flown at half staff on Memorial Day.
The POW/MIA flag shall also be flown at half staff on Memorial Day.
Veterans' Day
The flags of the United States, the State of California and the City of Redlands shall be flown at half staff on Veterans' Day.
The POW/MIA flag shall also be flown at half staff on Veteran's Day.
National Korean War Veterans' Armistice Day
National POW/MIA Day
The Council recognizes the third Friday in September of each year as a day for POW/MIA and their families throughout the City of Redlands. The City shall display the POW/MIA flag daily at all City facilities where flags are normally displayed Peace Officers Memorial Day
The United States flag will be flown at half staff at all City facilities where flags are normally displayed each year on \lay 15 . in accordance w ith Public Law 103-322 and the Congressional Joint Resolution approved October 1, 1%2. designating May 15* of each year as "Peace Officers Memorial Day
'
and the ucek in which it falls as "Police
Week."
DJM\Reso\Draft Flag Policy
Redlands Regular Meeting 06-21-2022 532 of 1716
Other Davs
It is customary to honor prominent public officials holding office at the time of their deaths. City of Redlands shall use the following list:
Federal Government: President, Vice President, US Supreme Court Justice, Members of Congress and a Secretary of an executive or military department.
State Govermnent: Governor, incumbent judge of the Superior Court or Justice Court* City Officials: City Mayors and Council Members
DJM\Reso\Draft Flag Policy
Redlands Regular Meeting 06-21-2022 533 of 1716
City Council Meeting J. 1.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Public Hearing to consider Resolution Nos. 8297 and 8298 approving the Engineer's Reports for Landscape Maintenance District No. 1 and Street Lighting District No. 1, and implement the assessments for Fiscal Year 22/23 (Municipal Utilities and Engineering Director Harris)
PROCEDURE FOR PUBLIC HEARING:
1. Mayor declares the meeting open as a public hearing.
2. Mayor calls upon Department Director for report.
3. Mayor calls for questions/comments from members of the City Council.
Mayor calls for comments/questions/testimony from members of the public (3 minutes per speaker).
4. 5. Mayor calls upon City Clerk to note any written comments received.
6. Mayor closes the public hearing.
7. City Council considers the motion and votes.
MOTION(S):
If City Council determines the staff recommendation is appropriate, the following motion is provided:
I move to adopt Resolution Nos. 8297 and 8298.
RECOMMENDATION:
Staff recommends City Council adopt Resolution Nos. 8297 and 8298 approving the Engineer's Reports for Landscape Maintenance District No. 1 and Street Lighting District No. 1, and implementing the assessments for Fiscal Year 22/23.
Redlands Regular Meeting 06-21-2022 534 of 1716
DISCUSSION:
On July 7, 1987, City Council ordered the formation of Landscape Maintenance District No. 1 (LM District), which was established to ensure satisfactory levels of maintenance are provided. LM District assessments provide funding for labor, material, and equipment associated with landscape services provided by the City within the LM District. These services include turf and ground cover maintenance, irrigation, tree and bush trimming, and LM District management.
On September 19, 1989, City Council ordered the formation of Street Lighting District No. 1 (SL District), which was established to generate funding for electricity to power street lights, labor, material, and equipment to replace burned out or damaged street light bulbs, damaged street light poles, and provide SL District management.
On May 3, 2022, City Council approved Goutam Dobey, Engineering Manager, as the Assessment Engineer for both districts. As the Assessment Engineer, Mr.
Dobey is responsible for the preparation of the Engineer’s Reports required to levy the annual assessment in accordance with the California Streets and Highways Code.
On June 7, 2022, City Council adopted Resolution No. 8295, preliminarily approving the Engineer's Reports for the LM District and SL District, and adopted Resolution No. 8296, setting June 21, 2022 as the Public Hearing date for consideration of levying FY 22/23 assessments in accordance with the Lighting and Landscaping Act of 1972.
The intent of tonight's Public Hearing is to receive testimony from the public on the proposed assessments for FY 22/23. Adoption of Resolution Nos. 8297 and 8298 approves the Engineer's Reports and the FY 22/23 assessments for both districts.
ALTERNATIVES:
City Council may deny the staff recommendation. However, the San Bernardino County Assessor will not levy the assessments on the property tax bills without adoption of these Resolutions.
STRATEGIC PLAN:
N/A
Redlands Regular Meeting 06-21-2022 535 of 1716
SUBMITTED BY:
John R. Harris, Municipal Utilities and Engineering Director REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Christopher Boatman, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Goutam K. Dobey, Engineering Manager
PREPARED BY:
Don Young, One Stop Permit Center Manager
Fiscal Impact
Fiscal Year: FY 22/23
Revenue Generating: Yes
Appropriation Required Y/N: No
Discussion:
The proposed FY 22/23 SL District and LM District assessments are anticipated to generate revenues of $25,465.25 and $28,784.34 respectively, which will supplement Facilities and Community Services Department costs to provide services within the districts.
Attachments
A. Resolution No 8297 - LMD Confirming Diagram 2022
B. Resolution No 8298 - SLD Confirming Diagram 2022
C. LMD Engineer's Report
D. SLD Engineer's Report
Redlands Regular Meeting 06-21-2022 536 of 1716
RESOLUTION NO. 8297
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 2022-2023
FISCAL YEAR IN CONNECTION WITH LANDSCAPE MAINTENANCE
DISTRICT NO. 1 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS AND
HIGHWAYS CODE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:
Section 1. On June 7, 2022, the City Council of the City of Redlands initiated proceedings and declared its intention to levy an assessment against the assessable lots and parcels of property within an existing assessment district designated “Landscape Maintenance District No 1” (the District) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500) (the “Act”) for the fiscal year commencing July 1, 2022, and ending June 30, 2023, and ordered the Engineering Manager, Goutam Dobey, to prepare and file a written report in accordance with Article 4 of Chapter 1 of the Act. The City Council, by prior resolution, approved such Engineer’s Report.
Section 2. Following notice duly given in accordance with law, this City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessment within the District for fiscal year 2022-2023 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear, and be heard regarding, protests and objections to the levy and collection of the proposed assessment against lots or parcels of property within the District. The City Council considered all oral and written statements, protests and communications made or filed by interested persons.
Section 3. Based upon its review of the Engineer’s Report and other reports and information, the City Council hereby finds and determines that (i) the land within the District will be benefited by the improvements described in the Engineer’s Report (ii) the District includes all of the lands so benefited, and (iii) the net amount to be assessed upon the lands with the District for the 2022-2023 fiscal year in accordance with the Engineer’s Report is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.
Section 4. The City Council declares that the diagram and assessment in the Engineer’s Report are hereby confirmed as filed.
Section 5. The City Council hereby orders the improvements described in the Engineer’s Report to be made.
Redlands Regular Meeting 06-21-2022 537 of 1716
Section 6. The assessment is in compliance with the provisions of the Act and the City Council has complied with all law pertaining to the levy of an annual assessment pursuant to the Act.
Section 7. The assessments to be levied and collected against the assessable lots and parcels of property within the District for fiscal year 2022-2023 are not proposed to increase from the assessment levied and collected for fiscal year 1997-1998.
Section 8. The assessment is levied without regard to property valuation.
Section 9. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.
Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for fiscal year 2022-2023.
Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.
Section 12. The County Auditor of San Bernardino County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.
Section 13. The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund for Landscape Maintenance District No. 1.
Section 14. The adoption of this Resolution constitutes the levy of an assessment against the lots and parcels of land in the District for the fiscal year commencing July 1, 2022, and ending June 30, 2023.
Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption.
Section 16. A certified copy of the assessment and diagram shall be filed in the City’s Municipal Utilities and Engineering Department, with a duplicate copy on file in the office of the City Clerk and open for public inspection.
Redlands Regular Meeting 06-21-2022 538 of 1716
ADOPTED, SIGNED AND APPROVED this 21st day of June, 2022.
________________________________
Paul T. Barich, Mayor
ATTEST:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 539 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was adopted by the City Council, at a regular meeting thereof, held on the 21st day of June, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 540 of 1716
RESOLUTION NO. 8298
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 2022-2023 FISCAL
YEAR IN CONNECTION WITH STREET LIGHTING MAINTENANCE DISTRCT NO. 1 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS AND HIGHWAYS CODE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:
Section 1. On June 7, 2022, the City Council of the City of Redlands initiated proceedings and declared its intention to levy an assessment against the assessable lots and parcels of property within an existing assessment district designated “Street Lighting Maintenance District No. 1” (the “District”) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500) (the “Act”) for the fiscal year commencing July 1, 2022, and ending June 30, 2023, and ordered the Engineering Manager, Goutam Dobey, to prepare and file a written report in accordance with Article 4 of Chapter 1 of the Act. This City Council, also by adoption of a prior resolution, approved such Engineer’s Report.
Section 2. Following notice duly given in accordance with law, the City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessment within the District for fiscal year 2022-2023 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear, and be heard regarding, protests and objections to the levy and collection of the proposed assessment against lots or parcels of property within the District. The City Council considered all oral and written statements, protests and communications made or filed by interested persons.
Section 3. Based upon its review of the Engineer’s Report and other reports and information, the City Council hereby finds and determines that (i) land within the District will be benefited by the improvements described in the Engineers Report (ii) the District includes all of the lands so benefited, and (iii) the net amount to be assessed upon the lands within the District for the 2022-2023 fiscal year in accordance with the Engineer’s Report is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.
Section 4. The City Council declares that the diagram and assessment in the Engineer’s Report are hereby confirmed as filed.
Section 5. The City Council hereby orders the improvements described in the Engineer’s Report to be made.
Redlands Regular Meeting 06-21-2022 541 of 1716
Section 6. The assessment is in compliance with the provisions of the Act and the City Council has complied with all law pertaining to the levy of an annual assessment pursuant to the Act.
Section 7. The assessments to be levied and collected against the assessable lots and parcels of property within the District for fiscal year 2022-2023 are not proposed to increase from the assessment levied and collected for fiscal year 1997-1998.
Section 8. The assessment is levied without regard to property valuation.
Section 9. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.
Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for fiscal year 2022-2023.
Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.
Section 12. The County Auditor of San Bernardino County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.
Section 13. The City Treasurer shall deposit all monies representing assessments collected by the County to the credit of a special fund for Street Lighting Maintenance District No.
1. Section 14. The adoption of this Resolution constitutes the levy of an assessment against the lots and parcels of land in the District for the fiscal year commencing July 1, 2022, and ending June 30, 2023.
Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption.
Section 16. A certified copy of the assessment and diagram shall be filed in the City’s Municipal Utilities and Engineering Department, with a duplicate copy on file in the office of the City Clerk and open for public inspection.
Redlands Regular Meeting 06-21-2022 542 of 1716
ADOPTED, SIGNED AND APPROVED this 21st day of June, 2022.
________________________________
Paul T. Barich, Mayor
ATTEST:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 543 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was adopted by the City Council, at a regular meeting thereof, held on the 21st day of June, 2022 by the following vote:
AYES:
NOES:
ABSENT
ABSTAIN:
____________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 544 of 1716
CITY OF REDLANDS
LANDSCAPE MAINTENANCE DISTRICT NO. 1
ENGINEER’S REPORT
FOR FISCAL YEAR 2022-2023
CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
Redlands Regular Meeting 06-21-2022 545 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 546 of 1716
ENGINEER’S REPORT AFFIDAVIT
Landscape Maintenance District No. 1
City of Redlands
San Bernardino County, State of California
This Report describes the Landscape Maintenance District No. 1 (“District”) and services therein including the improvements, budgets, parcels and assessments to be levied for Fiscal Year 2022-2023 as they existed at the time of the passage of the Resolution of Intention. Reference is hereby made to the San Bernardino County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this 1st day of June, 2022
By:
Goutam Dobey
Engineering Manager
R.C.E # 75646
Redlands Regular Meeting 06-21-2022 547 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 548 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
TABLE OF CONTENTS
I. AUTHORITY FOR REPORT
II. GENERAL DESCRIPTION
III. PLANS AND SPECIFICATIONS
IV. IMPROVEMENTS
V. ASSESSMENT DIAGRAM
VI. ESTIMATED COSTS AND MAINTENANCE
VII. ASSESSMENT ROLL
VIII. PROPOSED BASIS FOR ASSESSMENTS
IX. CALCULATION OF MAINTENANCE AND INCIDENTAL COSTS
X. ESTIMATED ASSESSMENTS FOR FY 2022-2023
APPENDIX A: CALCULATION OF MAINTENANCE AND INCIDENTAL
COST TABLE
APPENDIX B: DISTRICT ASSESSMENT DIAGRAM
APPENDIX C: RESOLUTIONS
APPENDIX D: ASSESSMENT ROLL
Redlands Regular Meeting 06-21-2022 549 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 550 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
1 I. AUTHORITY FOR REPORT
This report is prepared by order of the City Council of the City of Redlands, California (City). This report is in compliance with the requirements of Chapter 1, Article 4, and Chapter 3 of Division 15 of the Streets and Highway Code of the State of California (Landscape and Lighting Act of 1972) and Article XIIID of the California Constitution.
II. GENERAL DESCRIPTION
The City Council of the City of Redlands, California has heretofore elected to form Landscape Maintenance District No. 1 (District) and annexed territories to said District.
The boundaries of said District and annexations thereto are entitled “Assessment Diagram of Landscape Maintenance District No. 1,” and are on file in the office of the City Clerk of the City of Redlands.
III. PLANS AND SPECIFICATIONS
The plans and specifications for the landscaping either have been or are being prepared by the developers. The plans and specifications for the landscaping will be in conformance with the requirements of the City’s Community Development Department, Planning Division and the Municipal Utilities and Engineering Department (MUED).
Reference is hereby made to the subject tract or parcel maps and assessment diagrams for the exact location of the landscaped areas. The plans and specifications by reference are hereby made a part of this report to the same extent as if said plans and specifications were attached hereto.
IV. IMPROVEMENTS
All areas within the Landscape Maintenance District No. 1, identified in this report as the Original District and Annexation No. L1 through L12, are to be maintained by the District.
For FY 2022/23 the Original District (A, B and C), and Annexations L1-A, L1-B, L2-A, L4-C, L4-W, L5-C and L6-E are the only Annexations currently maintained. The remaining Annexations are either not yet developed or the landscaping has not been accepted by MUED for maintenance by the Facilities and Community Services Department.
The City, through MUED and Facilities and Community Services Department, has developed procedures for inspections, acceptance and maintenance of the landscaping improvements. It is anticipated that the Facilities and Community Services Department will be assigned the overall maintenance responsibilities once landscape improvements for individual Annexations have been accepted for maintenance.
Redlands Regular Meeting 06-21-2022 551 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
2 V. ASSESSMENT DIAGRAM
The assessment diagrams for the original districts and subsequent Annexations by reference are hereby made a part of this report and shown as Appendix B.
VI. ESTIMATED COSTS AND MAINTENANCE
It is anticipated that the City, through its Facilities and Community Services Department, will provide maintenance services for the District. The City’s record keeping will be required to be sufficiently accurate to detail the expenses so that actual cost of maintaining the District and Annexations are documented.
The District and Annexations which are maintained and those Annexations which are not maintained at this time, have been in existence for a number of years. Over the years the existing assessments have not kept pace with the true annual cost of maintenance and administration. As a result, the surplus balances established at the formation of the District and Annexations have depleted to cover expenses.
Approximately fifty-one (51) percent of the general administration and engineering costs are charged to the District and Annexations having landscaping maintained by the City.
Forty-nine (49) percent is spread to properties on an equal assessment per lot with on-site development, but with either no landscaping installed or landscaping which is not yet accepted for maintenance by the City. The latter assessment has not changed as compared to the last fiscal year and remains at $6.00 per lot.
The assessment per lot for general administration and engineering areas with landscaping maintained by the City is approximately $4.39 per lot for the Original District B and C, and Annexations L1-A, L1-B, L2-A, L4-W and L6-E. For Original District A, this amount is $36.16 per lot and for Annexation L5C it is $8.50 per lot. Annexation L4-C is maintained by the District but the assessment remains at $6.00 per lot.
Since there were numerous locations as part of Annexation Nos. 1, 2, 3, 4, etc. they were identified on the diagram as Original A, 1-1A, 1-1B, etc. Prefix L is added to the identification on the later annexations to identify that it is within the District. The description of the annexations will be within Sections IX and X of this report.
VII. ASSESSMENT ROLL
Following the public hearing for FY 2022-2023 (FY 22/23) assessments and the City Council’s approval of the assessments, an assessment roll will be prepared. The assessment roll will include the assessment parcel number, the San Bernardino County Assessor’s parcel number and the confirmed assessment for each parcel. The assessment roll will be filed with the City Clerk and will subsequently be transmitted to the San Bernardino County Auditor/Tax Collector.
Redlands Regular Meeting 06-21-2022 552 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
3 VIII. PROPOSED BASIS FOR ASSESSMENTS
The City Council has heretofore determined that it will be necessary to utilize the provisions of the Landscaping and Lighting Act of 1972, a benefit assessment act, for the Original District and the subsequent Annexations to the District and to assess benefitting properties in proportion to the benefits that the various properties will receive.
IX. CALCULATION OF MAINTENANCE AND INCIDENTAL COST
For a breakdown of the Maintenance and Incidental Costs see Appendix A – Calculation of Maintenance and Incidental Cost Table
X. ESTIMATED ASSESSMENTS FOR FY 2021-2022
The City Council, in forming the District and in annexing territories to the District, has maintained the philosophy that the subdivider or developer is responsible for the plantings, irrigation system and the maintenance of the improvements until they become well established. The assessments for maintenance thus only include anticipated costs incurred subsequent to the acceptance of the established improvements by MUED.
The maintenance of the landscaping is vital for the protection of both economic and humanistic values of the development. The City Council has heretofore determined that for the preservation of values incorporated within developments adjacent to landscaped areas, the parcels within the developments should be included in a maintenance district to ensure satisfactory levels of maintenance. The establishment of the assessment for each development must be on a unit-by-unit basis, which will preserve the integrity of each project.
The determination of benefit for the lots within the District and Annexations takes into consideration the following facts for the Original Districts and Annexations thereto:
Redlands Regular Meeting 06-21-2022 553 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
4 Original District - Tracts 13282, 13434 and 13496
1. The purpose of landscaping is to provide an aesthetic impression on the area.
2. The maintained landscaping benefits all properties in the development.
3. The benefits to the lots that are not adjacent to the landscaped areas benefit by the uniform maintenance and appearance. All lots that are not abutting the landscaped areas benefit equally.
4. The landscaping on the Wabash Avenue and San Bernardino Avenue, boundaries of Tracts 13282 and 13434 respectively, is oriented away from the units adjacent to the landscaped areas; however, these properties were given a 10 percent surcharge to recognize proximity and support benefit.
5. The landscaping in the common area along the Alessandro Road frontage of Tract 13496 is oriented towards all units. Two of the lots abut the landscaped areas and were given a 20 percent surcharge to recognize proximity and support benefit.
6. The lots to receive a surcharge shall be considered to be within Assessment Zone “A”.
Formula for Assessment
A = Assessment per interior lot
L = Number of lots that are not adjacent to landscaping areas on the Wabash Avenue frontage of Tract 13282, the San Bernardino Avenue frontage of 13434 and the Alessandro Road frontage of Tract 13496
P = Number of lots with a 10 percent or 20 percent surcharge LA + P [(1.10) or (1.20)] A = Amount to be assessed
The FY 22/23 assessment will be spread based upon the preceding formula.
Redlands Regular Meeting 06-21-2022 554 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
5 Original 1-A
Tract 13282
The total lot count in Tract 13282 is 38 lots, with 8 of those lots being adjacent to Wabash Avenue.
FY 2022/23 Assessment
(20A) + 8 (1.10A) = $2,409
A = $62.09
APN 0168-681-01 thru 16, 25 thru 38
The amount of assessment for lots that are not adjacent to the landscaping areas on Wabash Avenue = $62.09
APN 0168-681-17 thru 24
The amount of assessment for lots adjacent to Wabash Avenue with a 10 percent surcharge = $68.30
Redlands Regular Meeting 06-21-2022 555 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
6 Original 1-B
Tract 13434
The total lot count in Tract 13434 is 78 lots, with 4 of these lots being adjacent to San Bernardino Avenue.
FY 22/23 Assessment
(74A) + 4 (1.10A) = $2,826
A = $36.05
APN 0167-802-2 thru 7
APN 0167-803-2 thru 8
APN 0167-804-1 thru 19
APN 0167-823-1 thru 10
APN 0167-284-1 thru 32
The amount of assessment for lots that are not adjacent to the landscaping areas on San Bernardino Avenue = $36.05
APN 0167-802-01, 08
APN 0167-803-01, 09
The amount of assessments for lots adjacent to San Bernardino Avenue with a 10 percent surcharge = $39.65
Redlands Regular Meeting 06-21-2022 556 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
7 Original 1-C
Tract 13496
The total lot count in Tract 13496 is 9 lots, with 2 of these lots being adjacent to Alessandro Road.
FY 2022/23 Assessment
(7A) + 2 (1.2A) = $12,320
A = $1,310.64
APN 0175-491-02 thru 08
The amount of assessment for lots that are not adjacent to the landscaping areas on Alessandro Road = $1,310.64
APN 0175-491-01, 09
The amount of assessment for lots adjacent to Alessandro Road with a 20 percent surcharge = $1,572.77
Redlands Regular Meeting 06-21-2022 557 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
8 Annexation No. L1-A – Tract 13745
1. The purpose of landscaping is to provide an aesthetic impression on the area.
2. The maintained landscaping benefits all properties in the development.
3. The benefit to the lots that are not adjacent to the landscaped areas benefit by the uniform maintenance and appearance. All lots that are not abutting the landscaped areas benefit equally.
4. The landscaping on San Bernardino Avenue is oriented away from the lots adjacent to the landscaped areas; however, these properties were given a 10 percent surcharge to recognize proximity and support benefit. These lots within Assessment Zone “A” are shown on the Assessment Diagram.
Formula for Assessment
A = Assessment per interior lot
L = Number of lots that are not adjacent to landscaping areas on San Bernardino Avenue
P = Number of lots with a 10 percent within Assessment Zone “A” LA + P (1.10) A = Amount to be assessed
The FY 22/23 Assessment will be spread based upon the preceding formula. The total lot count in the tract is 38 lots, with 9 of these lots being adjacent to San Bernardino Avenue.
FY 22/23 Assessment
(29A) + 9 (1.10A) = $3,601
A = $92.57
APN 1212-141-01 thru 15, 25 thru 38
The amount of assessment for lots that are not adjacent to the landscaping areas on San Bernardino Avenue = $92.57
APN 1212-141-16 thru 24
The amount of assessments for lots within Assessment Zone “A” adjacent to the San Bernardino Avenue landscaping areas with a 10 percent surcharge = $101.83 Redlands Regular Meeting 06-21-2022 558 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
9 Annexation No. L1-B – Tract 13765
1. The purpose of landscaping is to provide an aesthetic impression on the area.
2. The maintained landscaping benefits all properties in the development.
3. The benefit to the lots that are not adjacent to the landscaped areas benefit by the uniform maintenance and appearance. All lots that are not abutting the landscaped areas benefit equally.
4. The landscaping on San Bernardino Avenue is oriented away from the lots adjacent to the landscaped areas; however, these properties were given a 10 percent surcharge to recognize proximity and support benefit. These lots within Assessment Zone “A” as shown on the Assessment Diagram.
Formula for Assessment
A = Assessment per interior lot
L = Number of lots that are not adjacent to landscaping areas on San Bernardino Avenue
P = Number of lots with a 10 percent within Assessment Zone “A” LA + P (1.10) A = Amount to be assessed
The FY 22/23 Assessment will be spread based upon the preceding formula. The total lot count in the tract is 25 lots, with 2 of these lots being adjacent to San Bernardino Avenue.
FY 22/23 Assessment
(23A) + 2 (1.10A) = $2,554
A = $101.35
APN 1212-081-54 thru -62
The amount of assessment for lots that are not adjacent to the landscaping areas on San Bernardino Avenue = $101.35
APN 1212-141-39 and -54
The amount of assessments for lots within Assessment Zone “A” adjacent to the San Bernardino Avenue landscaping areas with a 10 percent surcharge = $111.48 Redlands Regular Meeting 06-21-2022 559 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
10 Annexation No. L2-A – Tract 13947
1. The purpose of landscaping is to provide an aesthetic impression on the area.
2. The maintained landscaping benefits all properties in the development.
3. The benefit to the lots that are not adjacent to the landscaped areas benefit by the uniform maintenance and appearance. All lots that are not abutting the landscaped areas benefit equally.
4. The landscaping on Reservoir Road is oriented away from the lots adjacent to the landscaped areas; however, these properties were given a 20 percent surcharge to recognize proximity and support benefit. These lots are within Assessment Zone “A” as shown on the Assessment Diagram
Formula for Assessment
A = Assessment per interior lot
L = Number of lots that are not adjacent to landscaping areas on Reservoir Road P = Number of lots with a 20 percent within Assessment Zone “A” LA + P (1.20) A = Amount to be assessed
FY 22/23 Assessment will be spread based upon the preceding formula. The total lot count in the tract is 35 lots, with 4 of these lots being adjacent to Reservoir Road.
FY 22/23 Assessment
(31A) + 4 (1.20A) = $1,595
A = $44.55
APN 0174-621-1 thru 7, 9 thru 25, 28 thru 34
The amount of assessment for lots that are not adjacent to the landscaping areas on Reservoir Road = $44.55
APN 0174-621-08, 26, 27, 35
The amount of assessments for lots within Assessment Zone “A” adjacent to the Reservoir Road landscaping areas with a 20 percent surcharge = $53.46.
Redlands Regular Meeting 06-21-2022 560 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
11 Annexation No. L3-A – Parcel Map 11917
Formula for Assessment
T = Total length of perimeter landscaping = 3,099 feet
L = Individual lot length of perimeter landscaping
A = Amount to be assessed = $600
The FY 22/23 Assessment will be spread based upon the preceding formula. The total lot count in the tract is 4 lots.
FY 22/23 Assessment
Assessment per lot:
APN 0292-032-39 = 1010 ft/3099 ft x $600 = $195.55
APN 0292-032-40 = 206 ft/3099 ft x $600 = $39.88
APN 0292-032-41 = 324 ft/3099 ft x $600 = $62.73
APN 0292-032-42 = 1559 ft/3099 ft x $600 = $301.84
Redlands Regular Meeting 06-21-2022 561 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
12 Annexation No. L5-C – Tract 14556
1. The purpose of landscaping is to provide an aesthetic impression on the area.
2. The maintained landscaping benefits all properties in the development.
3. The benefit to the lots that are not adjacent to the landscaped areas benefit by the uniform maintenance and appearance. All lots that are not abutting the landscaped areas benefit equally.
4. The landscaping on the median at the intersection of Franklin Avenue and Garden Street is oriented away from lots adjacent to the landscaped areas; however, these properties were given a 10 percent surcharge to recognize proximity and support benefit. These lots within Assessment Zone “A” as shown on the Assessment Diagram.
Formula for Assessment
A = Assessment per interior lot
L = Number of lots that are not adjacent to landscaping areas on Franklin Avenue and Garden Street
P = Number of lots with a 10 percent within Assessment Zone “A” LA + P (1.10) A = Amount to be assessed
The FY 22/23 Assessment will be spread based upon the preceding formula. The total lot count in the tract is 10 lots, with 4 of these lots being in close proximity to the landscaped median at the intersection of Franklin Avenue and Garden Street.
FY 22/23 Assessment
(6A) + 4 (1.10A) = $815
A = $78.37
APN 0176-441-18, 23 thru 27
The amount of assessment for lots that are not adjacent to the landscaping areas = $78.37 APN 0174-441-19 thru 22
The amount of assessments for lots within Assessment Zone “A” adjacent to the landscaping areas with a 10 percent surcharge = $86.20
Redlands Regular Meeting 06-21-2022 562 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
13 Annexation No. L4, L5 (except L5-C), L6, L7, L8, L9, L10, L11 and L12 No assessments are proposed to be levied on the parcels in these annexations in association with the landscape maintenance costs. However, these parcels will receive special benefit and be assessed for the per lot general City overhead charges and the prorated share of the Annual Engineer’s Report to ensure that the required landscaping be maintained to the standards established by the City and anticipated when the improvements were initially required. The assessment will be $6.00 per lot in each of these annexations. * * * * * * * * * * * *
The City Council will hold a public meeting on June 21, 2022 to determine the assessments based upon the costs for FY 2022-2023 which are anticipated to be incurred by the City and which are to be recovered through assessments as required by the Landscaping and Lighting District Act of 1972.
Redlands Regular Meeting 06-21-2022 563 of 1716
City of Redlands
Landscape Maintenance District No. 1
Engineer’s Report
Fiscal Year 2022-2023
14 THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 564 of 1716
APPENDIX A
CALCULATION OF MAINTENANCE AND INCIDENTAL COST TABLE
Redlands Regular Meeting 06-21-2022 565 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 566 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023
District Name Original 1-A Original 1-B Original 1-C Annexation L1-A Annexation L1-B Annexation L2-A Annexation L3-A Annexation L4-A Annexation L4-B Annexation L4-C Annexation L4-D Annexation L4-E Annexation L4-F Annexation L4-G Annexation L4-H Description Tract 13282 Tract 13434 Tract 13496 Tract 13745 Tract 13765 Tract 13947 PM 11917 MS 185 MS 178 CUP 617 MS 184 CUP 382 CRA 606 CRA 486 CUP 253 Parcel Numbers Wabash Avenue San Bernardino
Avenue Alessandro Road San BernardinoAvenue
San Bernardino
Avenue Reservoir Road Lugonia Avenue APN 293-172-16THRU 18 APN 292-033-11 APN 167-231-19THRU 21 APN 171-383-19
& 20 APN 169-131-33 APN 292-321-10 APN 169-411-07
Maintenance
Contract
Maintenance $ 1,340 $ 1,340 $ 5,103 $ 1,190 $ 650 $ 550 $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ 520 $ 940 $ 4,450 $ 1,865 $ 1,360 $ 1,300 $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ 250 $ 250 $ 1,250 $ 250 $ 250 $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ 50 $ 50 $ 50 $ 50 $ 50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ 2,160 $ 2,580 $ 10,853 $ 3,355 $ 2,310 $ 1,850 $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 250 $ 250 $ 1,475 $ 250 $ 250 $ 6 $ 600 $ - $ 60 $ 6 $ 18 $ 12 $ 6 $ 6 $ 6 SUBTOTAL $ 250 $ 250 $ 1,475 $ 250 $ 250 $ 6 $ 600 $ - $ 60 $ 6 $ 18 $ 12 $ 6 $ 6 $ 6 TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ 2,410 $ 2,830 $ 12,328 $ 3,605 $ 2,560 $ 1,856 $ 600 $ - $ 60 $ 6 $ 18 $ 12 $ 6 $ 6 $ 6 Levy
Adjustments
Fund Collection $ (1) $ (4) $ (8) $ (4) $ (6) $ (261) $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
BALANCE TO
LEVY $ (1) $ (4) $ (8) $ (4) $ (6) $ (261) $ - $ - $ - $ - $ - $ - $ - $ - $ - Levy
Non-Adjacent Breakdown
Lots 30 74 7 29 23 31 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 8 4 0 9 2 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 2 0 0 4 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 0 0 0 0 0 0 0 0 10 1 3 2 1 1 1
TOTAL LOTS 38 78 9 38 25 35 0 0 10 1 3 2 1 1 1
Non-Adjacent
Rate per Lot $ 62.09 $ 36.05 $ 1,310.64 $ 92.57 $ 101.35 $ 44.55 $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ 68.30 $ 39.65 $ - $ 101.83 $ 111.48 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ 1,572.77 $ - $ 53.46 $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ - $ - $ - $ - $ - $ - $ - $ - $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL
ASSESSMENT
ALLOWABLE $ 2,409.10 $ 2,826.30 $ 12,320.02 $ 3,601.00 $ 2,554.01 $ 1,594.89 $ 600.00 $ - $ 60.00 $ 6.00 $ 18.00 $ 12.00 $ 6.00 $ 6.00 $ 6.00 Total # of
Parcels 38 78 9 38 25 35 4 4 10 1 3 2 1 1 1
Total Parcels
Levied 38 78 9 38 25 35 4 0 3 1 3 2 1 1 1
Redlands Regular Meeting 06-21-2022 567 of 1716
District Name Annexation L4-I Annexation L4-J Annexation L4-K Annexation L4-L Annexation L4-M Annexation L4-N Annexation L4-O Annexation L4-P Annexation L4-Q Annexation L4-R Annexation L4-S Annexation L4-T Annexation L4-U Annexation L4-V Annexation L4-W Description CRA 608 CUP 519 CUP 516 CUP 518 CUP 522 CUP 521 CRA 605 PM 12087 MS 185 CUP 278 CUP 405 CRA 354 CRA 346 CRA 607 Tract 12461 Parcel Numbers APN 169-142-11 APN 171-331-04 APN 292-166-11 APN 169-053-12 APN 172-031-49 APN 292-034-16 APN 169-182-02, -03, -04 APN 171-261-01 APN 176-044-14& 15 APN 171-171-34 APN 169-343-07 APN 292-182-30& 31 APN 292-061-25 APN 292-156-21 APN 1212-191-60 THRU 79 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 550 Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,180 Incidental
Expenses
Engineering and
Admin. $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ 18 $ 6 $ 12 $ - $ 6 $ 88 SUBTOTAL $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ 18 $ 6 $ 12 $ - $ 6 $ 88 TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ 18 $ 6 $ 12 $ - $ 6 $ 1,268 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,148) General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,148) Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 1 1 1 1 1 3 0 1 3 1 2 0 1 20
TOTAL LOTS 1 1 1 1 1 1 3 0 1 3 1 2 0 1 20
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1.00 $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL
ASSESSMENT
ALLOWABLE $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 18.00 $ - $ 6.00 $ 18.00 $ 6.00 $ 12.00 $ - $ 6.00 $ 120.00 Total # of
Parcels 1 1 1 1 1 1 3 1 2 3 1 2 1 1 20
Total Parcels
Levied 1 1 1 1 1 1 3 0 1 3 1 2 0 1 20
Redlands Regular Meeting 06-21-2022 568 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023
District Name Annexation L4-X Annexation L5-A Annexation L5-B Annexation L5-C Annexation L5-D Annexation L5-E Annexation L5-F Annexation L5-G Annexation L5-H Annexation L6-A Annexation L6-B Annexation L6-C Annexation L6-D Annexation L6-E Annexation L6-F Description PM 12022 MS 188 MS 189 Tract 14556 CRA 611 MS 196 MS 195 CRA 615 CRA 536 CRA 517 CRA 628 CRA 624 CRA 305 Tract 13575 CUP 550 Parcel Numbers APN 169-212-17
THRU 27
APN 292-153-24
THRU 27
APN 292-441-11
THRU 15
APN 176-441-18
THRU 27 0174-241-31 APN 292-331-15& 16
APN 294-091-47
& 48 APN 292-157-31 APN 292-381-17 APN 169-321-01& 02 APN 292-310-07 APN 169-281-39 APN 167-271-61 APN 1212-201-01THRU 27 APN 292-165-15 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 550 $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ 180 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 925 $ - Field Inspections $ - $ - $ - $ 350 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ 200 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ 730 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,475 $ - Incidental
Expenses
Engineering and
Admin. $ 66 $ 24 $ 30 $ 85 $ 12 $ 12 $ 12 $ 6 $ - $ 12 $ 6 $ 6 $ 6 $ 119 $ 6 SUBTOTAL $ 66 $ 24 $ 30 $ 85 $ 12 $ 12 $ 12 $ 6 $ - $ 12 $ 6 $ 6 $ 6 $ 119 $ 6 TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ 66 $ 24 $ 30 $ 815 $ 12 $ 12 $ 12 $ 6 $ - $ 12 $ 6 $ 6 $ 6 $ 1,594 $ 6 Levy
Adjustments
Fund Collection $ - $ - $ - $ 0 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,432) $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
BALANCE TO
LEVY $ - $ - $ - $ 0 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ (1,432) $ - Levy
Non-Adjacent Breakdown
Lots 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 11 4 5 0 2 2 2 1 0 2 1 1 1 27 1
TOTAL LOTS 11 4 5 10 2 2 2 1 0 2 1 1 1 27 1
Non-Adjacent
Rate per Lot $ - $ - $ - $ 78.37 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ 86.20 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ - $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL
ASSESSMENT
ALLOWABLE $ 66.00 $ 24.00 $ 30.00 $ 815.02 $ 12.00 $ 12.00 $ 12.00 $ 6.00 $ - $ 12.00 $ 6.00 $ 6.00 $ 6.00 $ 162.00 $ 6.00 Total # of
Parcels 11 4 5 10 2 2 2 1 1 2 1 1 1 27 1
Total Parcels
Levied 11 4 5 10 2 2 2 1 0 2 1 1 1 27 1
Redlands Regular Meeting 06-21-2022 569 of 1716
District Name Annexation L6-G Annexation L6-H Annexation L6-I Annexation L6-J Annexation L7-A Annexation L7-B Annexation L7-C Annexation L7-D Annexation L7-E Annexation L7-F Annexation L7-G Annexation L7-H Annexation L7-I Annexation L8-A Annexation L8-B Description CRA 623 CUP 542 Tract 16310 MS 201 MS 213 MS 211 CUP 559 CRA 636 CRA 546 CRA 641 CRA 640 CUP 562 CUP 548 CRA 637 Tract 10179 Parcel Numbers APN 292-381-08 APN 292-064-13,
17, 21 THRU 27
APN 173-052-31
THRU 42 & APN
173-062-01
THRU 39
APN 171-341-33 APN 172-301-14
THRU 17
APN 292-201-36,
37, 38 changed to
292-201-37, -39,
and -40
APN 171-202-30 APN 169-043-14 APN 292-192-11 APN 292-310-36 APN 169-301-08, 10, 11 APN 292-064-17 APN 169-313-16 APN 169-281-23
APN 167-861-37
THRU 54, APN
167-851-39 THRU
56 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 6 $ 54 $ 300 $ 6 $ 24 $ 18 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ - $ 216 SUBTOTAL $ 6 $ 54 $ 300 $ 6 $ 24 $ 18 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ - $ 216 TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ 6 $ 54 $ 300 $ 6 $ 24 $ 18 $ 6 $ 6 $ 6 $ 6 $ 18 $ - $ 6 $ - $ 216 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 9 50 1 4 3 1 1 1 1 3 0 1 1 36
TOTAL LOTS 1 9 50 1 4 3 1 1 1 1 3 0 1 1 36
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ - $ 6.00 TOTAL
ASSESSMENT
ALLOWABLE $ 6.00 $ 54.00 $ 300.00 $ 6.00 $ 24.00 $ 18.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 18.00 $ - $ 6.00 $ - $ 216.00 Total # of
Parcels 1 9 51 1 4 3 1 1 1 1 3 1 1 1 36
Total Parcels
Levied 1 9 50 1 4 3 1 1 1 1 3 0 1 0 36
Redlands Regular Meeting 06-21-2022 570 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023
District Name Annexation L8-C Annexation L8-D Annexation L8-E Annexation L9-A Annexation L9-B Annexation L10-A Annexation L10-B Annexation L10-C Annexation L10-D Annexation L10-E Annexation L10-F Annexation L10-G Annexation L10-H Annexation L11-A Description CUP 574 CRA 642 MS 216 B CRA 648 CUP 581 CRA 658 CRA 639 CRA 652 CUP 602 CUP 590 CUP 577 CUP 541 Tract 14790-1 CRA 664 Parcel Numbers APN 171-202-33 APN 292-154-12 APN 174-021-41, 42 APN 292-157-16 APN171-203-13 APN 292-202-17 &18
APN 292-152-39,
32 APN 292-063-45 APN 292-063-48,-52, -53 APN 171-332-30 APN 1212-041-01 APN 174-261-15 Multiple APNs APN 292-341-24 &25 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 6 $ 6 $ 12 $ 6 $ 6 $ 12 $ 6 $ 6 $ - $ 6 $ 6 $ 6 $ 240 $ 12 SUBTOTAL $ 6 $ 6 $ 12 $ 6 $ 6 $ 12 $ 6 $ 6 $ - $ 6 $ 6 $ 6 $ 240 $ 12 TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ 6 $ 6 $ 12 $ 6 $ 6 $ 12 $ 6 $ 6 $ - $ 6 $ 6 $ 6 $ 240 $ 12 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 1 2 1 1 2 1 1 0 1 1 1 40 2
TOTAL LOTS 1 1 2 1 1 2 1 1 0 1 1 1 40 2
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ - $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL
ASSESSMENT
ALLOWABLE $ 6.00 $ 6.00 $ 12.00 $ 6.00 $ 6.00 $ 12.00 $ 6.00 $ 6.00 $ - $ 6.00 $ 6.00 $ 6.00 $ 240.00 $ 12.00 Total # of
Parcels 1 1 2 1 1 2 2 1 1 1 1 1 40 2
Total Parcels
Levied 1 1 2 1 1 2 1 1 0 1 1 1 40 2
Redlands Regular Meeting 06-21-2022 571 of 1716
District Name Annexation L11-B Annexation L11-C Annexation L12-A Annexation L12-B Annexation L12-C Annexation L12-D Annexation L12-E Annexation L12-F Annexation L12-G Annexation L12-H Annexation L12-I Annexation L12-J Description CRA 666 Tract 11535 Tract 7202 Tract 7202 Tract 7202 Tract 7202 Tract 7202 Tract 15589 CUP 620 CUP 617 CRA 668 CRA 670 Parcel Numbers APN 292-158-15 APN 292-351-08 APN 176-402-09 APN176-402-08 APN 176-402-07 APN 176-402-06 APN 176-402-04 APN 293-421-01 THRU 45 APN 292-251-10 APN292-033-13 APN 292-341-17 APN 292-157-20 Maintenance
Contract
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Repair Beyond
Contract $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Water & Electric $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Field Inspections $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Supplies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental
Expenses
Engineering and
Admin. $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 270 $ 6 $ 6 $ 6 $ 6 SUBTOTAL $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 270 $ 6 $ 6 $ 6 $ 6 TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ 270 $ 6 $ 6 $ 6 $ 6 Levy
Adjustments
Fund Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
BALANCE TO
LEVY $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Levy
Non-Adjacent Breakdown
Lots 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(10%) 0 0 0 0 0 0 0 0 0 0 0 0
Adjacent Lots
(20%) 0 0 0 0 0 0 0 0 0 0 0 0
Per Lot City
Overhead 1 1 1 1 1 1 1 45 1 1 1 1
TOTAL LOTS 1 1 1 1 1 1 1 45 1 1 1 1
Non-Adjacent
Rate per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(10%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Adjacent Rate
(20%) per Lot $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 TOTAL
ASSESSMENT
ALLOWABLE $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 $ 270.00 $ 6.00 $ 6.00 $ 6.00 $ 6.00 Total # of
Parcels 1 1 1 1 1 1 1 45 1 1 1 1
Total Parcels
Levied 1 1 1 1 1 1 1 45 1 1 1 1
Redlands Regular Meeting 06-21-2022 572 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
LANDSCAPE MAINTENANCE DISTRICT NO. 1, FY 2022-2023
District Name Annexation L12-K Annexation L12-L Annexation L12-M TOTALS Description MS 235 MS 221 CRA 661
Parcel Numbers Multiple APNs APN 174-281-33,
-34, -35, -37 APN 171-161-18
Maintenance
Contract
Maintenance $ - $ - $ - $ 11,273
Repair Beyond
Contract $ - $ - $ - $ -
Water & Electric $ - $ - $ - $ 12,170
Field Inspections $ - $ - $ - $ 2,600
Supplies $ - $ - $ - $ 450
SUBTOTAL $ - $ - $ - $ 26,493
Incidental
Expenses
Engineering and
Admin. $ - $ 24 $ 6 $ 5,155
SUBTOTAL $ - $ 24 $ 6 $ 5,155
TOTAL
MAINTENANC
E &
INCIDENTAL
COSTS $ - $ 24 $ 6 $ 31,648
Levy
Adjustments
Fund Collection $ - $ - $ - $ (2,864)
General Fund
Contribution $ - $ - $ - $ -
BALANCE TO
LEVY $ - $ - $ - $ (2,864)
Levy
Non-Adjacent Breakdown
Lots 0 0 0 200
Adjacent Lots
(10%) 0 0 0 27
Adjacent Lots
(20%) 0 0 0 6
Per Lot City
Overhead 0 4 1 345
TOTAL LOTS 0 4 1
Non-Adjacent
Rate per Lot $ - $ - $ -
Adjacent Rate
(10%) per Lot $ - $ - $ -
Adjacent Rate
(20%) per Lot $ -
Per Lot City
Overhead $ 6.00 $ 6.00 $ 6.00
TOTAL
ASSESSMENT
ALLOWABLE $ - $ 24.00 $ 6.00 $ 28,784.34
Total # of
Parcels 21 4 1 615
Total Parcels
Levied 0 4 1 574
Redlands Regular Meeting 06-21-2022 573 of 1716
APPENDIX B
DISTRICT DIAGRAM
Redlands Regular Meeting 06-21-2022 574 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 575 of 1716
CITY OF REDLANDS
LANDSCAPE MAINTENANCE DISTRICT NO. 1
APPENDIX B - ASSESSMENT DIAGRAMS
Redlands Regular Meeting 06-21-2022 576 of 1716
2 Abbreviations
APN – Assessor’s Parcel Number
CRA – Commission Review and Approval
CUP – Conditional Use Permit
MS – Minor Subdivision
PM – Parcel Map
TM – Tract Map
General comments
Each annexation has its own diagram.
North is up unless notated otherwise.
The assessor’s parcel numbers are shown as a 9 digit number.
A dark red line delineates the boundary of each annexation.
A shaded background is typically used to indicate parcels within the Landscape Maintenance District.
Annexation #s
Original District A thru C
L1-A thru L1-B
L2-A
L3-A
L4-A thru L4-X
L5-A thru L5-H
L6-A thru L6-J
L7-A thru L7-I
L8-A thru L8-E
L9-A thru L9-B
L10-A thru L10-H
L11-A thru L11-C
L12-A thru L12-M
Redlands Regular Meeting 06-21-2022 577 of 1716
3 Initial District - A
Tract Map 13282
Redlands Regular Meeting 06-21-2022 578 of 1716
4 Initial District - B
Tract 13434
APN 167-802-01 thru 08, APN 167-803-01 thru -09, APN 167-804-01 thru -19, APN 167-823-01 thru 10, APN 167-824-01 thru -32,
Redlands Regular Meeting 06-21-2022 579 of 1716
5 Initial District - C
Tract Map 13496
APN 0175-491-01 thru -09
Redlands Regular Meeting 06-21-2022 580 of 1716
6 Annexation L1-A
Tract 13745
APN 1212-141-01 thru -38
Redlands Regular Meeting 06-21-2022 581 of 1716
7 Annexation L1-B
Tract 13765
APN 1212-081-54 thru -62 and APN 1212-141-39 and -54
Redlands Regular Meeting 06-21-2022 582 of 1716
8 Annexation L2-A
Tract 13947
Redlands Regular Meeting 06-21-2022 583 of 1716
9 Annexation L3-A
Parcel Map 11917
Redlands Regular Meeting 06-21-2022 584 of 1716
10 Annexation L4-A
Parcel Map 12450
Redlands Regular Meeting 06-21-2022 585 of 1716
11 Annexation L4-B
Parcel Map 11755
Redlands Regular Meeting 06-21-2022 586 of 1716
12 Annexation L4-C
CUP 617
Redlands Regular Meeting 06-21-2022 587 of 1716
13 Annexation L4-D
Parcel Map 12300
Redlands Regular Meeting 06-21-2022 588 of 1716
14 Annexation L4-E
CUP 382
Redlands Regular Meeting 06-21-2022 589 of 1716
15 Annexation L4-F
CRA 606
Redlands Regular Meeting 06-21-2022 590 of 1716
16 Annexation L4-G
CRA 486
Redlands Regular Meeting 06-21-2022 591 of 1716
17 Annexation L4-H
CUP 253
Redlands Regular Meeting 06-21-2022 592 of 1716
18 Annexation L4-I
CRA 808
Redlands Regular Meeting 06-21-2022 593 of 1716
19 Annexation L4-J
CUP 519
Redlands Regular Meeting 06-21-2022 594 of 1716
20 Annexation L4-K
CUP 516
Redlands Regular Meeting 06-21-2022 595 of 1716
21 Annexation L4-L
CUP 518
Redlands Regular Meeting 06-21-2022 596 of 1716
22 Annexation L4-M
CUP 522
Redlands Regular Meeting 06-21-2022 597 of 1716
23 Annexation L4-N
CUP 521
Redlands Regular Meeting 06-21-2022 598 of 1716
24 Annexation L4-O
CRA 805
Redlands Regular Meeting 06-21-2022 599 of 1716
25 Annexation L4-P
Parcel Map 12087
Redlands Regular Meeting 06-21-2022 600 of 1716
26 Annexation L4-Q
MS 185, Parcel Map 11904
Redlands Regular Meeting 06-21-2022 601 of 1716
27 Annexation L4-R
CUP 278
Redlands Regular Meeting 06-21-2022 602 of 1716
28 Annexation L4-S
CUP 405
Redlands Regular Meeting 06-21-2022 603 of 1716
29 Annexation L4-T
CRA 354
Redlands Regular Meeting 06-21-2022 604 of 1716
30 Annexation L4-U
CRA 346
Redlands Regular Meeting 06-21-2022 605 of 1716
31 Annexation L4-V
CRA 607
Redlands Regular Meeting 06-21-2022 606 of 1716
32 Annexation L4-W
Tract Map 12461
Redlands Regular Meeting 06-21-2022 607 of 1716
33 Annexation L4-X
Parcel Map 12022
Redlands Regular Meeting 06-21-2022 608 of 1716
34 Annexation L5-A
Parcel Map 12330
Redlands Regular Meeting 06-21-2022 609 of 1716
35 Annexation L5-B
Parcel Map 12940
Redlands Regular Meeting 06-21-2022 610 of 1716
36 Annexation L5-C
Tract 14556
Redlands Regular Meeting 06-21-2022 611 of 1716
37 Annexation L5-D
CRA 611
Redlands Regular Meeting 06-21-2022 612 of 1716
38 Annexation L5-E
Parcel Map 13261
Redlands Regular Meeting 06-21-2022 613 of 1716
39 Annexation L5-F
Parcel Map 11189
Redlands Regular Meeting 06-21-2022 614 of 1716
40 Annexation L5-G
CRA 615
Redlands Regular Meeting 06-21-2022 615 of 1716
41 Annexation L5-H
CRA 536
Redlands Regular Meeting 06-21-2022 616 of 1716
42 Annexation L6-A
CRA 517
Redlands Regular Meeting 06-21-2022 617 of 1716
43 Annexation L6-B
CRA 628
Redlands Regular Meeting 06-21-2022 618 of 1716
44 Annexation L6-C
CRA 624
Redlands Regular Meeting 06-21-2022 619 of 1716
45 Annexation L6-D
CRA 305
Redlands Regular Meeting 06-21-2022 620 of 1716
46 Annexation L6-E
Tract Map 13575
Redlands Regular Meeting 06-21-2022 621 of 1716
47 Annexation L6-F
CUP 550
Redlands Regular Meeting 06-21-2022 622 of 1716
48 Annexation L6-G
CRA 623
Redlands Regular Meeting 06-21-2022 623 of 1716
49 Annexation L6-H
Parcel Map 13542
Redlands Regular Meeting 06-21-2022 624 of 1716
50 Annexation L6-I
Parcel Map 10749
APN 0173-052-31 thru 42, APN 0173-062-01 thru 38, 39 (road) Redlands Regular Meeting 06-21-2022 625 of 1716
51 Annexation L6-J
MS 201
Redlands Regular Meeting 06-21-2022 626 of 1716
52 Annexation L7-A
MS 213, Parcel Map 13978
Redlands Regular Meeting 06-21-2022 627 of 1716
53 Annexation L7-B
MS 211
Lot line adjustment shifted the boundary between 0292-201-36 and -38 northerly.
New APNs were assigned by the Assessor. APN 0292-201-36 became -39 and APN 0292-201-38 became -40.
Redlands Regular Meeting 06-21-2022 628 of 1716
54 Annexation L7-C
CUP 559
Redlands Regular Meeting 06-21-2022 629 of 1716
55 Annexation L7-D
CRA 696
Redlands Regular Meeting 06-21-2022 630 of 1716
56 Annexation L7-E
CRA 543
Redlands Regular Meeting 06-21-2022 631 of 1716
57 Annexation L7-F
CRA 641
Redlands Regular Meeting 06-21-2022 632 of 1716
58 Annexation L7-G
CRA 640
Redlands Regular Meeting 06-21-2022 633 of 1716
59 Annexation L7-H
CUP 562
Already included in Annexation L6-N
Redlands Regular Meeting 06-21-2022 634 of 1716
60 Annexation L7-I
CUP 548
Redlands Regular Meeting 06-21-2022 635 of 1716
61 Annexation L8-A
CRA 637
Redlands Regular Meeting 06-21-2022 636 of 1716
62 Annexation L8-B
Tract Map 10179
APN 0167-851-39 thru 56 and APN 0167-861-37 thru 54
Redlands Regular Meeting 06-21-2022 637 of 1716
63 Annexation L8-C
CUP 574
Redlands Regular Meeting 06-21-2022 638 of 1716
64 Annexation L8-D
CUP 642
Redlands Regular Meeting 06-21-2022 639 of 1716
65 Annexation L8-E
Parcel Map 14090
Redlands Regular Meeting 06-21-2022 640 of 1716
66 Annexation L9-A
CRA 648
Redlands Regular Meeting 06-21-2022 641 of 1716
67 Annexation L9-B
CUP 581
Redlands Regular Meeting 06-21-2022 642 of 1716
68 Annexation L10-A
CRA 658
Redlands Regular Meeting 06-21-2022 643 of 1716
69 Annexation L10-B
CRA 639
Redlands Regular Meeting 06-21-2022 644 of 1716
70 Annexation L10-C
CRA 652
Redlands Regular Meeting 06-21-2022 645 of 1716
71 Annexation L10-D
CUP 602
Redlands Regular Meeting 06-21-2022 646 of 1716
72 Annexation L10-E
CUP 590
Redlands Regular Meeting 06-21-2022 647 of 1716
73 Annexation L10-F
CUP 577
Redlands Regular Meeting 06-21-2022 648 of 1716
74 Annexation L10-G
CUP 541
Redlands Regular Meeting 06-21-2022 649 of 1716
75 Annexation L10-H
Tract Map 14790-1
APN 0176-521-01 thru -13, APN 0176-521-18 thru -23
APN 0176-521-27 thru -32, APN 0176-531-01 thru -03
APN 0176-531-07 thru -09, APN 0176-531-12, -13, and -18 APN 0176-531-20 thru -22, APN 0176-531-24 thru -26
Redlands Regular Meeting 06-21-2022 650 of 1716
76 Annexation L11-A
CRA 664
Redlands Regular Meeting 06-21-2022 651 of 1716
77 Annexation L11-B
CRA 666
Redlands Regular Meeting 06-21-2022 652 of 1716
78 Annexation L11-C
Tract 11535, Lot 36
Redlands Regular Meeting 06-21-2022 653 of 1716
79 Annexation L12-A, L12-B, L12-C, L12-D and L12-E
Annexation L12-A, APN 0176-402-09
Annexation L12-B, APN 0176-402-08
Annexation L12-C, APN 0176-402-07
Annexation L12-D, APN 0176-402-06
Annexation L12-E, APN 0176-402-04
Redlands Regular Meeting 06-21-2022 654 of 1716
80 Annexation L12-F
Tract 15589
APN 0293-421-01 thru -45
Redlands Regular Meeting 06-21-2022 655 of 1716
81 Annexation L12-G
CUP 620
Redlands Regular Meeting 06-21-2022 656 of 1716
82 Annexation L12-H
CUP 617
Redlands Regular Meeting 06-21-2022 657 of 1716
83 Annexation L12-I
CRA 668
Redlands Regular Meeting 06-21-2022 658 of 1716
84 Annexation L12-J
CUP 670
Redlands Regular Meeting 06-21-2022 659 of 1716
85 Annexation L12-K
MS 235
APN 0170-041-05, 0170-151-28, 0170-161-02, and 1212-431-02 Redlands Regular Meeting 06-21-2022 660 of 1716
86 Annexation L12-L
MS 221
Redlands Regular Meeting 06-21-2022 661 of 1716
87 Annexation L12-M
CRA 661
Redlands Regular Meeting 06-21-2022 662 of 1716
APPENDIX C
RESOLUTIONS
Redlands Regular Meeting 06-21-2022 663 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 664 of 1716
CITY OF REDLANDS
LANDSCAPE MAINTENANCE DISTRICT NO. 1
APPENDIX C – RESOLUTIONS
Resolution No 8294 – Institute proceedings and appointment of engineer Resolution No 8295 – Preliminary approval of engineer’s report Resolution No 8296 – Declaring intention to levy assessments Resolution No 8297 – Confirming a diagram and assessments Redlands Regular Meeting 06-21-2022 665 of 1716
This page intentionally left blank
Redlands Regular Meeting 06-21-2022 666 of 1716
RESOLUTION NO. 8294
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
INSTITUTING PROCEEDINGS FOR THE CONTINUED LEVY OF
ASSESSMENTS, APPOINTING AN ASSESSMENT ENGINEER, AND
ORDERING THE PREPARATION OF AN ENGINEER'S REPORT IN THE MATTER OF STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE
MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (this “City Council”) has determined that the public interest, convenience and necessity requires the installation, operation and maintenance of a street lighting system and other facilities as set forth in Section 22525 of the California Streets and Highways Code; and
WHEREAS, it has been determined by the City Council of the City of Redlands (this “City Council”), that the public interest, convenience and necessity requires the maintenance of landscaping as set forth in Section 22525 of the California Streets and Highways Code; and WHEREAS, this City Council has formed Redlands’ Street Lighting District No. 1 to pay the costs associated with the installation, operation and maintenance of such street lighting system and other facilities; and
WHEREAS, this City Council has formed Redlands’ Landscape Maintenance District No. 1 to pay the costs for the maintenance such landscaping; and WHEREAS, it is the desire of this City Council to initiate proceedings and order the preparation of an engineer’s report to levy assessments for fiscal year 2022-2023 upon properties located within Street Lighting District No. 1 and Landscape Maintenance District No. 1; and WHEREAS, this City Council further desires to appoint Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, as the "Assessment Engineer" for Street Lighting District No. 1 and Landscape Maintenance District No. 1;
NOW, THEREFORE, the City Council of the City of Redlands does hereby find, determine and resolve as follows:
Section 1. That the public interest, convenience and necessity requires the continued levy of assessments within Street Lighting District No. 1 for the purpose of installing, operating and maintaining street lights and associated facilities as authorized by Section 22620 of the California Streets and Highways Code and in compliance with Article XIIID, and Section 19 of Article XVI, of the California Constitution.
Section 2. That the public interest, convenience and necessity requires the continued levy of assessments within Landscape Maintenance District No. 1 for the purpose of maintaining landscaping and improvements as authorized by Section 22620 of the California Streets and Redlands Regular Meeting 06-21-2022 667 of 1716
Highways Code and in compliance with the requirements of Article XIIID and Section 19 of Article XVI of the California Constitution.
Section 3. That the properties to be assessed for the installation, operation and maintenance of the street lighting facilities shall be those properties located within the boundaries of Street Lighting District No. 1.
Section 4. That the properties to be assessed for the maintenance and operation of the landscaping and improvements shall be those properties located within the boundaries of Landscape Maintenance District No. 1.
Section 5. That the proceedings for the continued levy of assessments within Street Lighting District No. 1 and Landscape Maintenance District No. 1 shall be conducted in accordance the with provisions of Division 15 of the California Streets and Highways Code (the Landscaping and Lighting Act of 1972) and in compliance with the requirements of Article XIIID, and Section 19 of Article XVI, of the California Constitution.
Section 6. That Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, having an office located at 35 Cajon Street, Suite 15A, Redlands, California, is hereby appointed “Assessment Engineer” and shall have the authority conferred upon the Assessment Engineer by the Landscaping and Lighting Act of 1972.
Section 7. That the Assessment Engineer is hereby ordered to prepare a report in accordance with the Landscaping and Lighting Act of 1972.
ADOPTED, SIGNED AND APPROVED this 3rd day of May, 2022. ______________________________
Paul T. Barich, Mayor
ATTEST:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 668 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, do hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 3rd day of May, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 669 of 1716
This page intentionally left blank.
Redlands Regular Meeting 06-21-2022 670 of 1716
RESOLUTION NO. 8295
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS GIVING PRELIMINARY APPROVAL OF THE ENGINEER'S REPORTS FOR FISCAL YEAR 2022- 2023 FOR STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (the “City Council”) has heretofore determined that the public interest, convenience and necessity require the maintenance and operation of street lighting and appurtenant facilities, as set forth in Section 22525 of the Streets and Highways Code, within the incorporated boundaries of the City of Redlands; and WHEREAS, the City Council has heretofore determined that the public interest, convenience and necessity require the maintenance of landscape and irrigation facilities set forth in Section 22525 of the Streets and Highways Code, State of California, within the incorporated boundaries of the City of Redlands; and
WHEREAS, Goutam Dobey, City of Redlands’ Engineering Manager, 35 Cajon Street, Suite 15A, Redlands, California, has been appointed “Assessment Engineer” with all provisions of Part 2 of Division 15 of the Streets and Highways Code applicable to the Engineer being applied to the “Assessment Engineer;” and
WHEREAS, Sections 22622 and 22623 of the Streets and Highways Code require that an Engineer's Report be prepared and filed annually, specifying the assessments to be levied against the benefitting properties within the City’s Street Lighting District No. 1 and Landscape Maintenance District No. 1; and
WHEREAS, the City of Redlands Engineering Manager, as the Assessment Engineer, has prepared and filed with the City Clerk reports in writing as required by the Landscaping and Lighting Act of 1972 and in compliance with Article XIIID of the California Constitution; and WHEREAS, the City Council has duly considered said reports and each and every part thereof; and finds that each and every part of said reports is sufficient, and that no part of said reports requires modification in any respect;
NOW, THEREFORE, be it resolved by the City Council of the City of Redlands as follows:
Section 1. That the Engineer's estimate of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said reports be, and each of them are hereby, preliminarily approved and confirmed.
Section 2. That the diagram showing the Street Lighting District No. 1 and Landscape Maintenance District No. 1 referred to and described in said reports, and the boundaries of the lots and parcels of land within such assessment district as the same existed at the time of passage of this resolution, are hereby preliminarily approved and confirmed.
Redlands Regular Meeting 06-21-2022 671 of 1716
Section 3. That the proposed assessment upon the properties in Street Lighting District No. 1 and Landscape Maintenance District No. 1, in proportion to the estimated benefit to be received by such properties, respectively, from said work and of the incidental expenses thereof, as contained in said report is hereby preliminarily approved and confirmed.
Section 4. That said reports shall stand as the Engineer's Report for the purposes of all subsequent proceedings for Street Lighting District No. 1 and Landscape Maintenance District No. 1.
APPROVED AND ADOPTED this 7th day of June, 2022.
________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 672 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting thereof held on the 7th day of June, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 673 of 1716
This page intentionally left blank.
Redlands Regular Meeting 06-21-2022 674 of 1716
RESOLUTION NO. 8296
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
DECLARING ITS INTENTION TO LEVY AND COLLECT ASSESSMENTS WITHIN REDLANDS’ STREET LIGHTING ASSESSMENT DISTRICT NO. 1 AND LANDSCAPE ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2021-2022 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, AND ESTABLISHING A TIME AND PLACE FOR PUBLIC HEARINGS
FOR THE TWO DISTRICTS TO CONSIDER PROTESTS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:
Section 1. The City Council of the City of Redlands hereby (1) finds that the public interest and convenience requires, and (2) declares its intention to levy and collect, assessments against the lots and parcels of property within an existing assessment districts designated “Redlands’ Street Lighting Assessment District No. 1 and Landscape Assessment District No. 1” (the “Districts”) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code (commencing with Section 22500) (the “Act”) for fiscal year 2022-2023, commencing July 1, 2022, and ending June 30, 2023, to pay for the costs and expenses of the improvements described in Section 3 hereof.
Section 2. Reference is hereby made to a map on file in the office of the City Clerk and open for public inspection for a description of the exterior boundaries of the Districts.
Section 3. The proposed improvements are briefly described as follows: The operation, maintenance and servicing of public within the District, including the operation, maintenance and servicing of public lighting facilities and landscaping, including safety lighting, traffic signals, trees, shrubs, grass and other ornamental vegetation, and appurtenant facilities, located along public roadways, streets and rights-of-way within the boundaries of the Districts. “Maintenance” means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of the public lighting and landscaping facilities, and appurtenant facilities, including repair, removal or replacement of all or part of any of the public lighting and landscaping facilities, or appurtenant facilities. “Servicing” means the maintenance of any of the public lighting and landscaping facilities or appurtenant facilities, including the furnishing of electric current, energy or gas for the operation of any of the lighting facilities and the furnishing of water for the irrigation of any of the landscaping facilities.
Section 4. The assessments to be levied and collected against the assessable lots and parcels of property within the Districts for fiscal year 2022-2023 are not proposed to increase from the assessments levied and collected for fiscal year 1997-1998.
Section 5. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the Districts shall not be subject to assessment to be made under these proceedings to cover any of the costs and expenses of the improvements.
Redlands Regular Meeting 06-21-2022 675 of 1716
Section 6. All railroad, gas, water and electric utility rights-of-way are included within the Districts and shall be assessed in accordance with the benefits received from the improvements.
Section 7. Reference is hereby made to the Reports of the Engineer entitled “City of Redlands Street Lighting District No. 1 Engineer’s Report for Fiscal Year 2022-2023” and “City of Redlands Landscape Maintenance District No. 1 Engineer’s Report for Fiscal Year 2022- 2023” on file in the office of the City Clerk for a full and detailed description of the improvements, the boundaries of the District and any zones therein and the proposed assessments upon assessable lots and parcels of land within the District.
Section 8. NOTICE IS HEREBY GIVEN THAT THE CITY COUNCIL APPOINTS TUESDAY, THE 21ST DAY OF JUNE, 2022, AT THE HOUR OF 6:00 P.M., OR AS SOON
THEREAFTER AS THE MATTER MAY BE HEARD, IN THE COUNCIL CHAMBERS AT CITY HALL, CITY OF REDLANDS, 35 CAJON STREET, SUITE 2, REDLANDS, CALIFORNIA 92373, AS THE TIME AND PLACE FOR TWO PUBLIC HEARINGS TO
CONSIDER PROTESTS OR OBJECTIONS TO THE LEVY OF THE PROPOSED ASSESSMENTS IN CONNECTION WITH THE DISTRICTS. All interested persons shall be afforded the opportunity to hear and be heard. Any interested person may file a written protest with the City Clerk prior to the conclusion of the hearing. A written protest shall state all grounds of objection. A protest by a property owner shall contain a description sufficient to identify the property owned by the signer thereof. The City Council shall consider all oral statements and all written protests made or filed by any interested person.
Section 9. The City Clerk is hereby authorized and directed to give notice of such hearing in accordance with law.
Section 10. The City Council hereby determines and declares that the proposed assessments constitute a continuation of assessments existing on the effective date of Article XIIID, that the assessments are imposed exclusively to finance the maintenance and operation expenses for streets and that the assessments are exempt from the requirements of Article XIIID, Section 4 of the California Constitution.
Section 11. The City Council hereby designates Goutam Dobey, Engineering Manager, telephone number (909) 798-7584 x2, to answer inquiries regarding the hearing, protest proceedings and procedural or technical matters.
Redlands Regular Meeting 06-21-2022 676 of 1716
ADOPTED, SIGNED AND APPROVED this 7th day of June, 2022. ______________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was duly adopted by the City Council, at a regular meeting thereof, held on the 7th day of June, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 677 of 1716
This page intentionally left blank.
Redlands Regular Meeting 06-21-2022 678 of 1716
RESOLUTION NO. 8277
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 2022-2023
FISCAL YEAR IN CONNECTION WITH LANDSCAPE MAINTENANCE
DISTRICT NO. 1 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS
AND HIGHWAYS CODE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:
Section 1. Pursuant to its adoption of a prior resolution, the City Council of the City of Redlands initiated proceedings and declared its intention to levy an assessment against the assessable lots and parcels of property within an existing assessment district designated “Landscape Maintenance District No 1” (the District) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500) (the “Act”) for the fiscal year commencing July 1, 2022, and ending June 30, 2023, and ordered the Engineering Manager, Goutam Dobey, to prepare and file a written report in accordance with Article 4 of Chapter 1 of the Act. The City Council, by prior resolution, approved such Engineer’s Report.
Section 2. Following notice duly given in accordance with law, this City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessment within the District for fiscal year 2022-2023 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear, and be heard regarding, protests and objections to the levy and collection of the proposed assessment against lots or parcels of property within the District. The City Council considered all oral and written statements, protests and communications made or filed by interested persons.
Section 3. Based upon its review of the Engineer’s Report and other reports and information, this City Council hereby finds and determines that (i) the land within the District will be benefited by the improvements described in the Engineer’s Report (ii) the District includes all of the lands so benefited, and (iii) the net amount to be assessed upon the lands with the District for the 2022-2023 fiscal year in accordance with the Engineer’s Report is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.
Section 4. The City Council declares that the diagram and assessment in the Engineer’s Report are hereby confirmed as filed.
Section 5. The City Council hereby orders the improvements described in the Engineer’s Report to be made.
Redlands Regular Meeting 06-21-2022 679 of 1716
Section 6. The assessment is in compliance with the provisions of the Act and the City Council has complied with all law pertaining to the levy of an annual assessment pursuant to the Act.
Section 7. The assessments to be levied and collected against the assessable lots and parcels of property within the District for fiscal year 2022-2023 are not proposed to increase from the assessment levied and collected for fiscal year 1997-1998.
Section 8. The assessment is levied without regard to property valuation.
Section 9. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.
Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for fiscal year 2022-2023.
Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.
Section 12. The County Auditor of San Bernardino County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.
Section 13. The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund for Landscape Maintenance District No. 1.
Section 14. The adoption of this Resolution constitutes the levy of an assessment against the lots and parcels of land in the District for the fiscal year commencing July 1, 2022, and ending June 30, 2023.
Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption.
Section 16. A certified copy of the assessment and diagram shall be filed in the City’s Municipal Utilities and Engineering Department, with a duplicate copy on file in the office of the City Clerk and open for public inspection.
Redlands Regular Meeting 06-21-2022 680 of 1716
ADOPTED, SIGNED AND APPROVED this 21st day of June 2022.
________________________________
Paul T. Barich, Mayor
ATTEST:
_______________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was adopted by the City Council, at a regular meeting thereof, held on the 21st day of June, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 681 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
0167-231-19-0000 709 LUGONIA AVE Annexation L4-D $ 6.00 0167-231-20-0000 705 LUGONIA AVE Annexation L4-D $ 6.00 0167-231-21-0000 1237 LAWTON ST Annexation L4-D $ 6.00
0167-271-61-0000 1135 CHURCH ST Annexation L6-D $ 6.00
0167-802-01-0000 1575 N COLUMBIA ST Original 1-B $ 39.65 0167-802-02-0000 1571 N COLUMBIA ST Original 1-B $ 36.05 0167-802-03-0000 1567 COLUMBIA ST Original 1-B $ 36.05
0167-802-04-0000 1563 COLUMBIA ST Original 1-B $ 36.05
0167-802-05-0000 1558 WOODBURY ST Original 1-B $ 36.05
0167-802-06-0000 1562 WOODBURY Original 1-B $ 36.05
0167-802-07-0000 1566 WOODBURY Original 1-B $ 36.05
0167-802-08-0000 1570 WOODBURY Original 1-B $ 39.65
0167-803-01-0000 1569 WOODBURY Original 1-B $ 39.65
0167-803-02-0000 1565 WOODBURY Original 1-B $ 36.05
0167-803-03-0000 1561 WOODBURY Original 1-B $ 36.05
0167-803-04-0000 610 ELISE Original 1-B $ 36.05
0167-803-05-0000 618 ELISE Original 1-B $ 36.05
0167-803-06-0000 626 ELISE Original 1-B $ 36.05
0167-803-07-0000 634 ELISE ST Original 1-B $ 36.05
0167-803-08-0000 1568 VERMONT Original 1-B $ 36.05
0167-803-09-0000 1574 VERMONT Original 1-B $ 39.65
0167-804-01-0000 633 ELISE Original 1-B $ 36.05
0167-804-02-0000 625 ELISE Original 1-B $ 36.05
0167-804-03-0000 617 ELISE Original 1-B $ 36.05
0167-804-04-0000 609 ELISE Original 1-B $ 36.05
0167-804-05-0000 601 ELISE Original 1-B $ 36.05
0167-804-06-0000 525 ELISE Original 1-B $ 36.05
0167-804-07-0000 517 ELISE Original 1-B $ 36.05
0167-804-08-0000 509 ELISE Original 1-B $ 36.05
0167-804-09-0000 1555 COLUMBIA ST Original 1-B $ 36.05
0167-804-10-0000 1551 COLUMBIA ST Original 1-B $ 36.05
0167-804-11-0000 1547 COLUMBIA ST Original 1-B $ 36.05
0167-804-12-0000 1543 N COLUMBIA ST Original 1-B $ 36.05 0167-804-13-0000 1528 CANTERBURY CIR Original 1-B $ 36.05 0167-804-14-0000 1530 CANTERBURY CIR Original 1-B $ 36.05 0167-804-15-0000 1532 CANTERBURY CIR Original 1-B $ 36.05 0167-804-16-0000 1534 CANTERBURY CIR Original 1-B $ 36.05 0167-804-17-0000 1536 CANTERBURY CIR Original 1-B $ 36.05 0167-804-18-0000 1538 CANTERBURY CIR Original 1-B $ 36.05 0167-804-19-0000 1540 CANTERBURY CIR Original 1-B $ 36.05 0167-823-01-0000 1539 CANTERBURY CIR Original 1-B $ 36.05 0167-823-02-0000 1537 CANTERBURY CIR Original 1-B $ 36.05 0167-823-03-0000 1535 CANTERBURY CIR Original 1-B $ 36.05 0167-823-04-0000 1533 CANTERBURY CIR Original 1-B $ 36.05 0167-823-05-0000 1531 CANTERBURY CIR Original 1-B $ 36.05 0167-823-06-0000 1509 CANTERBURY CIR Original 1-B $ 36.05 0167-823-07-0000 1507 CANTERBURY CIR Original 1-B $ 36.05 0167-823-08-0000 1505 CANTERBURY CIR Original 1-B $ 36.05 0167-823-09-0000 1503 CANTERBURY CIR Original 1-B $ 36.05 0167-823-10-0000 1501 CANTERBURY CIR Original 1-B $ 36.05 0167-824-01-0000 1539 COLUMBIA ST Original 1-B $ 36.05
0167-824-02-0000 1535 COLUMBIA ST Original 1-B $ 36.05
0167-824-03-0000 1531 COLUMBIA ST Original 1-B $ 36.05
0167-824-04-0000 1527 COLUMBIA ST Original 1-B $ 36.05
0167-824-05-0000 1523 COLUMBIA ST Original 1-B $ 36.05
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
Fiscal Year 2022/23 Page 1 of 11
Redlands Regular Meeting 06-21-2022 682 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0167-824-06-0000 1519 COLUMBIA ST Original 1-B $ 36.05
0167-824-07-0000 1515 COLUMBIA ST Original 1-B $ 36.05
0167-824-08-0000 1511 COLUMBIA ST Original 1-B $ 36.05
0167-824-09-0000 1507 COLUMBIA ST Original 1-B $ 36.05
0167-824-10-0000 1503 COLUMBIA ST Original 1-B $ 36.05
0167-824-11-0000 1501 COLUMBIA ST Original 1-B $ 36.05
0167-824-12-0000 508 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-13-0000 512 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-14-0000 516 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-15-0000 520 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-16-0000 600 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-17-0000 602 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-18-0000 606 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-19-0000 610 PENNSYLVANIA AVE Original 1-B $ 36.05 0167-824-20-0000 1500 CANTERBURY CIR Original 1-B $ 36.05 0167-824-21-0000 1502 CANTERBURY CIR Original 1-B $ 36.05 0167-824-22-0000 1504 CANTERBURY CIR Original 1-B $ 36.05 0167-824-23-0000 1506 CANTERBURY CIR Original 1-B $ 36.05 0167-824-24-0000 1508 CANTERBURY CIR Original 1-B $ 36.05 0167-824-25-0000 1510 CANTERBURY CIR Original 1-B $ 36.05 0167-824-26-0000 1512 CANTERBURY CIR Original 1-B $ 36.05 0167-824-27-0000 1514 CANTERBURY CIR Original 1-B $ 36.05 0167-824-28-0000 1516 CANTERBURY CIR Original 1-B $ 36.05 0167-824-29-0000 1518 CANTERBURY CIR Original 1-B $ 36.05 0167-824-30-0000 1520 CANTERBURY CIR Original 1-B $ 36.05 0167-824-31-0000 1522 CANTERBURY CIR Original 1-B $ 36.05 0167-824-32-0000 1524 CANTERBURY CIR Original 1-B $ 36.05 0167-851-39-0000 1832 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-40-0000 1828 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-41-0000 1824 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-42-0000 1820 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-43-0000 1816 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-44-0000 1812 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-45-0000 1808 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-46-0000 1804 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-47-0000 1800 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-48-0000 1835 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-49-0000 1831 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-50-0000 1827 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-51-0000 1823 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-52-0000 1819 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-53-0000 1815 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-54-0000 1811 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-55-0000 1807 BROOKSTONE ST Annexation L8-B $ 6.00 0167-851-56-0000 1803 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-37-0000 450 RIVERVIEW DR Annexation L8-B $ 6.00 0167-861-38-0000 1928 BROOKSTONE DR Annexation L8-B $ 6.00 0167-861-39-0000 1924 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-40-0000 1920 BROOKSTONE Annexation L8-B $ 6.00 0167-861-41-0000 1916 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-42-0000 1912 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-43-0000 1908 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-44-0000 1840 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-45-0000 1836 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-46-0000 1839 BROOKSTONE ST Annexation L8-B $ 6.00 Fiscal Year 2022/23 Page 2 of 11
Redlands Regular Meeting 06-21-2022 683 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0167-861-47-0000 1907 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-48-0000 1911 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-49-0000 1915 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-50-0000 1919 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-51-0000 1923 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-52-0000 1927 BROOKSTONE ST Annexation L8-B $ 6.00 0167-861-53-0000 410 RIVERVIEW DR Annexation L8-B $ 6.00 0167-861-54-0000 420 RIVERVIEW DR Annexation L8-B $ 6.00 0168-681-01-0000 1067 MENDICINO WY Original 1-A $ 62.09 0168-681-02-0000 1063 MENDICINO WY Original 1-A $ 62.09 0168-681-03-0000 1059 MENDICINO WY Original 1-A $ 62.09 0168-681-04-0000 1055 MENDICINO Original 1-A $ 62.09
0168-681-05-0000 1051 MENDICINO WY Original 1-A $ 62.09 0168-681-06-0000 1047 MENDOCINO Original 1-A $ 62.09
0168-681-07-0000 1043 MENDICINO WY Original 1-A $ 62.09 0168-681-08-0000 1039 MENDICINO Original 1-A $ 62.09
0168-681-09-0000 1035 MENDICINO Original 1-A $ 62.09
0168-681-10-0000 1756 MENDOCINO WY Original 1-A $ 62.09 0168-681-11-0000 1762 MENDOCINO WY Original 1-A $ 62.09 0168-681-12-0000 1768 MENDOCINO Original 1-A $ 62.09
0168-681-13-0000 1774 MENDICINO Original 1-A $ 62.09
0168-681-14-0000 1780 MENDICINO WY Original 1-A $ 62.09 0168-681-15-0000 1786 MENDICINO Original 1-A $ 62.09
0168-681-16-0000 1792 MENDOCINO Original 1-A $ 62.09
0168-681-17-0000 1798 MENDICINO Original 1-A $ 68.30
0168-681-18-0000 1008 ALPINE CT Original 1-A $ 68.30
0168-681-19-0000 1012 ALPINE Original 1-A $ 68.30
0168-681-20-0000 1016 ALPINE CT Original 1-A $ 68.30
0168-681-21-0000 1020 ALPINE Original 1-A $ 68.30
0168-681-22-0000 1024 ALPINE Original 1-A $ 68.30
0168-681-23-0000 1028 ALPINE CT Original 1-A $ 68.30
0168-681-24-0000 1032 ALPINE CT Original 1-A $ 68.30
0168-681-25-0000 1029 ALPINE CT Original 1-A $ 62.09
0168-681-26-0000 1025 ALPINE CT Original 1-A $ 62.09
0168-681-27-0000 1021 ALPINE ST Original 1-A $ 62.09
0168-681-28-0000 1017 ALPINE ST Original 1-A $ 62.09
0168-681-29-0000 1013 ALPINE Original 1-A $ 62.09
0168-681-30-0000 1009 ALPINE CT Original 1-A $ 62.09
0168-681-31-0000 1005 ALPINE CT Original 1-A $ 62.09
0168-681-32-0000 1042 MENDICINO WY Original 1-A $ 62.09 0168-681-33-0000 1046 MENDICINO Original 1-A $ 62.09
0168-681-34-0000 1050 MENDOCINO Original 1-A $ 62.09
0168-681-35-0000 1054 MENDICINO BLVD Original 1-A $ 62.09 0168-681-36-0000 1058 MENDICINO Original 1-A $ 62.09
0168-681-37-0000 1062 MENDICINO Original 1-A $ 62.09
0168-681-38-0000 1066 MENDICINO WY Original 1-A $ 62.09 0169-043-14-0000 506 W COLTON AVE Annexation L7-D $ 6.00 0169-053-12-0000 306 W COLTON AVE Annexation L4-L $ 6.00 0169-131-33-0000 507 LAWTON ST Annexation L4-F $ 6.00
0169-142-11-0000 511 W COLTON AVE Annexation L4-I $ 6.00 0169-182-02-0000 Annexation L4-O $ 6.00
0169-182-03-0000 316 THE TERRACE Annexation L4-O $ 6.00 0169-182-04-0000 Annexation L4-O $ 6.00
0169-212-17-0000 640 ORANGE ST Annexation L4-X $ 6.00
0169-212-18-0000 526 N ORANGE ST Annexation L4-X $ 6.00 Fiscal Year 2022/23 Page 3 of 11
Redlands Regular Meeting 06-21-2022 684 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0169-212-19-0000 500 N ORANGE ST Annexation L4-X $ 6.00 0169-212-20-0000 402-414 N ORANGE ST Annexation L4-X $ 6.00 0169-212-21-0000 418-450 N ORANGE ST Annexation L4-X $ 6.00 0169-212-22-0000 522 ORANGE ST Annexation L4-X $ 6.00
0169-212-23-0000 602 ORANGE ST Annexation L4-X $ 6.00
0169-212-24-0000 683 N 6TH ST Annexation L4-X $ 6.00
0169-212-25-0000 552 ORANGE ST Annexation L4-X $ 6.00
0169-212-26-0000 454-482 N ORANGE ST Annexation L4-X $ 6.00 0169-212-27-0000 411 N 6TH ST Annexation L4-X $ 6.00
0169-281-39-0000 347 ORANGE ST Annexation L6-C $ 6.00
0169-301-08-0000 E REDLANDS BLVD Annexation L7-G $ 6.00 0169-301-10-0000 21 E REDLANDS BLVD Annexation L7-G $ 6.00 0169-301-11-0000 170 E REDLANDS BLVD Annexation L7-G $ 6.00 0169-313-16-0000 304 7TH ST Annexation L7-I $ 6.00
0169-321-01-0000 Annexation L6-A $ 6.00
0169-321-02-0000 304 N 9TH ST Annexation L6-A $ 6.00
0169-343-07-0000 1210 W COLTON AVE Annexation L4-S $ 6.00 0169-411-07-0000 1205 W COLTON AVE Annexation L4-H $ 6.00 0171-161-18-0000 371 NEW YORK Annexation L12-M $ 6.00
0171-171-34-0000 380 N NEW YORK ST Annexation L4-R $ 18.00 0171-202-30-0000 404 BROOKSIDE AVE Annexation L7-C $ 6.00 0171-202-33-0000 420 BROOKSIDE AVE Annexation L8-C $ 6.00 0171-203-13-0000 302 BROOKSIDE AVE Annexation L9-B $ 6.00 0171-331-04-0000 243 CAJON ST Annexation L4-J $ 6.00
0171-332-30-0000 124 E OLIVE AVE Annexation L10-E $ 6.00 0171-341-33-0000 612 REDLANDS BLVD Annexation L6-J $ 6.00 0171-383-19-0000 680 E REDLANDS BLVD Annexation L4-E $ 6.00 0171-383-20-0000 680 E REDLANDS BLVD Annexation L4-E $ 6.00 0172-031-49-0000 30 S CENTER ST Annexation L4-M $ 6.00
0172-301-14-0000 1515 W CYPRESS AVE Annexation L7-A $ 6.00 0172-301-15-0000 1513 W CYPRESS AVE Annexation L7-A $ 6.00 0172-301-16-0000 1511 W CYPRESS AVE Annexation L7-A $ 6.00 0172-301-17-0000 1517 W CYPRESS AVE Annexation L7-A $ 6.00 0173-052-31-0000 432 SONORA CIR Annexation L6-I $ 6.00
0173-052-32-0000 430 SONORA CIR Annexation L6-I $ 6.00
0173-052-33-0000 428 SONORA CIR Annexation L6-I $ 6.00
0173-052-34-0000 426 SONORA CIR Annexation L6-I $ 6.00
0173-052-35-0000 424 SONORA CIR Annexation L6-I $ 6.00
0173-052-36-0000 422 SONORA CIR Annexation L6-I $ 6.00
0173-052-37-0000 420 SONORA CIR Annexation L6-I $ 6.00
0173-052-38-0000 418 SONORA CIR Annexation L6-I $ 6.00
0173-052-39-0000 416 SONORA CIR Annexation L6-I $ 6.00
0173-052-40-0000 412 SONORA CIR Annexation L6-I $ 6.00
0173-052-41-0000 410 SONORA CIR Annexation L6-I $ 6.00
0173-052-42-0000 457 LA VERNE Annexation L6-I $ 6.00
0173-062-01-0000 472 SONORA CIR Annexation L6-I $ 6.00
0173-062-02-0000 470 SONORA CIR Annexation L6-I $ 6.00
0173-062-03-0000 468 SONORA CIR Annexation L6-I $ 6.00
0173-062-04-0000 466 SONORA CIR Annexation L6-I $ 6.00
0173-062-05-0000 464 SONORA CIR Annexation L6-I $ 6.00
0173-062-06-0000 462 SONORA CIR Annexation L6-I $ 6.00
0173-062-07-0000 460 SONORA CIR Annexation L6-I $ 6.00
0173-062-08-0000 458 SONORA CIR Annexation L6-I $ 6.00
0173-062-09-0000 456 SONORA CIR Annexation L6-I $ 6.00
0173-062-10-0000 454 SONORA CIR Annexation L6-I $ 6.00
Fiscal Year 2022/23 Page 4 of 11
Redlands Regular Meeting 06-21-2022 685 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0173-062-11-0000 452 SONORA CIR Annexation L6-I $ 6.00
0173-062-12-0000 450 SONORA CIR Annexation L6-I $ 6.00
0173-062-13-0000 448 SONORA CIR Annexation L6-I $ 6.00
0173-062-14-0000 446 SONORA CIR Annexation L6-I $ 6.00
0173-062-15-0000 444 SONORA CIR Annexation L6-I $ 6.00
0173-062-16-0000 442 SONORA CIR Annexation L6-I $ 6.00
0173-062-17-0000 440 SONORA CIR Annexation L6-I $ 6.00
0173-062-18-0000 438 SONORA CIR Annexation L6-I $ 6.00
0173-062-19-0000 436 SONORA CIR Annexation L6-I $ 6.00
0173-062-20-0000 434 SONORA CIR Annexation L6-I $ 6.00
0173-062-21-0000 408 SONORA CIR Annexation L6-I $ 6.00
0173-062-22-0000 406 SONORA CIR Annexation L6-I $ 6.00
0173-062-23-0000 407 SONORA CIR Annexation L6-I $ 6.00
0173-062-24-0000 473 SONORA CIR Annexation L6-I $ 6.00
0173-062-25-0000 471 SONORA CIR Annexation L6-I $ 6.00
0173-062-26-0000 469 SONORA CIR Annexation L6-I $ 6.00
0173-062-27-0000 457 SONORA CIR Annexation L6-I $ 6.00
0173-062-28-0000 455 SONORA CIR Annexation L6-I $ 6.00
0173-062-29-0000 453 SONORA CIR Annexation L6-I $ 6.00
0173-062-30-0000 451 SONORA CIR Annexation L6-I $ 6.00
0173-062-31-0000 439 SONORA CIR Annexation L6-I $ 6.00
0173-062-32-0000 437 SONORA CIR Annexation L6-I $ 6.00
0173-062-33-0000 435 SONORA CIR Annexation L6-I $ 6.00
0173-062-34-0000 431 SONORA CIR Annexation L6-I $ 6.00
0173-062-35-0000 421 SONORA CIR Annexation L6-I $ 6.00
0173-062-36-0000 423 SONORA CIR Annexation L6-I $ 6.00
0173-062-37-0000 425 SONORA CIR Annexation L6-I $ 6.00
0173-062-38-0000 427 SONORA CIR Annexation L6-I $ 6.00
0174-021-41-0000 1377 KNOLL RD Annexation L8-E $ 6.00
0174-021-42-0000 1379 KNOLL RD Annexation L8-E $ 6.00
0174-241-31-0000 1475 FORD ST Annexation L5-D $ 12.00
0174-261-15-0000 1551 RESERVOIR RD Annexation L10-G $ 6.00 0174-281-33-0000 BUCKINGHAM Annexation L12-L $ 6.00
0174-281-34-0000 BUCKINGHAM Annexation L12-L $ 6.00
0174-281-35-0000 BUCKINGHAM Annexation L12-L $ 6.00
0174-281-37-0000 731 BUCKINGHAM DR Annexation L12-L $ 6.00 0174-621-01-0000 751 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-02-0000 755 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-03-0000 759 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-04-0000 763 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-05-0000 767 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-06-0000 771 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-07-0000 775 DEVONSHIRE DR Annexation L2-A $ 44.55 0174-621-08-0000 816 CONCORD Annexation L2-A $ 53.46
0174-621-09-0000 812 CONCORD Annexation L2-A $ 44.55
0174-621-10-0000 770 CONCORD Annexation L2-A $ 44.55
0174-621-11-0000 766 CONCORD Annexation L2-A $ 44.55
0174-621-12-0000 762 CONCORD Annexation L2-A $ 44.55
0174-621-13-0000 1609 SHEFFIELD Annexation L2-A $ 44.55 0174-621-14-0000 1613 SHEFFIELD Annexation L2-A $ 44.55 0174-621-15-0000 1617 SHEFFIELD Annexation L2-A $ 44.55 0174-621-16-0000 1621 SHEFFIELD Annexation L2-A $ 44.55 0174-621-17-0000 1625 SHEFFIELD Annexation L2-A $ 44.55 0174-621-18-0000 1629 SHEFFIELD Annexation L2-A $ 44.55 0174-621-19-0000 1633 SHEFFIELD Annexation L2-A $ 44.55 Fiscal Year 2022/23 Page 5 of 11
Redlands Regular Meeting 06-21-2022 686 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0174-621-20-0000 1636 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-21-0000 1632 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-22-0000 1628 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-23-0000 801 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-24-0000 805 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-25-0000 809 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-26-0000 813 LEXINGTON LN Annexation L2-A $ 53.46 0174-621-27-0000 812 LEXINGTON LN Annexation L2-A $ 53.46 0174-621-28-0000 808 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-29-0000 804 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-30-0000 800 LEXINGTON LN Annexation L2-A $ 44.55 0174-621-31-0000 1620 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-32-0000 1616 SHEFFIELD LN Annexation L2-A $ 44.55 0174-621-33-0000 769 CONCORD LN Annexation L2-A $ 44.55 0174-621-34-0000 811 CONCORD LN Annexation L2-A $ 44.55 0174-621-35-0000 815 CONCORD LN Annexation L2-A $ 53.46 0175-491-01-0000 1521 REBECCA CREST Original 1-C $ 1,572.77 0175-491-02-0000 REBECCA CREST Original 1-C $ 1,310.64
0175-491-03-0000 REBECCA CREST Original 1-C $ 1,310.64
0175-491-04-0000 1527 REBELLA CREST Original 1-C $ 1,310.64 0175-491-05-0000 1531 REBECCA CREST Original 1-C $ 1,310.64 0175-491-06-0000 1533 REBECCA CREST Original 1-C $ 1,310.64 0175-491-07-0000 1535 REBECCA CREST Original 1-C $ 1,310.64 0175-491-08-0000 1537 REBECCA CREST Original 1-C $ 1,310.64 0175-491-09-0000 1541 REBECCA CREST Original 1-C $ 1,572.77 0176-044-15-0000 605 VALLEY VIEW DR Annexation L4-Q $ 6.00 0176-402-04-0000 633 GOLDEN WEST DR Annexation L12-E $ 6.00 0176-402-06-0000 629 GOLDENWEST DR Annexation L12-D $ 6.00 0176-402-07-0000 627 GOLDEN WEST DR Annexation L12-C $ 6.00 0176-402-08-0000 GOLDEN WEST DR Annexation L12-B $ 6.00 0176-402-09-0000 623 GOLDEN WEST DR Annexation L12-A $ 6.00 0176-441-18-0000 1581 FRANKLIN AVE Annexation L5-C $ 78.37 0176-441-19-0000 1617 GARDEN ST Annexation L5-C $ 86.20 0176-441-20-0000 1613 GARDEN ST Annexation L5-C $ 86.20 0176-441-21-0000 1609 GARDEN ST Annexation L5-C $ 86.20 0176-441-22-0000 1583 FRANKLIN AVE Annexation L5-C $ 86.20 0176-441-23-0000 210 CANDY LN Annexation L5-C $ 78.37
0176-441-24-0000 226 CANDY LN Annexation L5-C $ 78.37
0176-441-25-0000 242 CANDY LN Annexation L5-C $ 78.37
0176-441-26-0000 250 CANDY LN Annexation L5-C $ 78.37
0176-441-27-0000 258 CANDY LN Annexation L5-C $ 78.37
0176-521-01-0000 1080 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-02-0000 1070 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-03-0000 1060 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-04-0000 1050 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-05-0000 1040 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-06-0000 1030 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-07-0000 1020 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-08-0000 1010 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-09-0000 1000 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-10-0000 912 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-11-0000 908 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-12-0000 904 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-13-0000 900 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-18-0000 1920 HORSE TRAIL DR Annexation L10-H $ 6.00 Fiscal Year 2022/23 Page 6 of 11
Redlands Regular Meeting 06-21-2022 687 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0176-521-19-0000 1910 HORSE TRAIL DR Annexation L10-H $ 6.00 0176-521-20-0000 1900 HORSE TRAIL DR Annexation L10-H $ 6.00 0176-521-21-0000 1011 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-22-0000 1021 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-23-0000 1031 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-27-0000 1061 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-28-0000 1041 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-29-0000 907 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-30-0000 949 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-31-0000 901 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-521-32-0000 951 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-01-0000 948 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-02-0000 944 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-03-0000 940 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-07-0000 924 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-08-0000 920 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-09-0000 916 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-12-0000 921 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-13-0000 931 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-18-0000 911 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-20-0000 936 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-21-0000 928 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-22-0000 932 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-24-0000 915 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-25-0000 947 SUNSET HILLS LN Annexation L10-H $ 6.00 0176-531-26-0000 945 SUNSET HILLS LN Annexation L10-H $ 6.00 0292-032-39-0000 1251 RESEARCH DR Annexation L3-A $ 195.55 0292-032-40-0000 1115 RESEARCH DR Annexation L3-A $ 39.88 0292-032-41-0000 1110 RESEARCH DR Annexation L3-A $ 62.73 0292-032-42-0000 2351 LUGONIA AVE Annexation L3-A $ 301.84 0292-033-11-0000 1101 N CALIFORNIA ST Annexation L4-C $ 6.00 0292-033-13-0000 1101 N CALIFORNIA ST Annexation L12-H $ 6.00 0292-034-16-0000 941 CALIFORNIA ST Annexation L4-N $ 6.00 0292-063-45-0000 1720 W REDLANDS BLVD Annexation L10-C $ 6.00 0292-064-13-0000 2094 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-17-0000 2098 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-21-0000 2046 REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-22-0000 2072 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-23-0000 2070 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-24-0000 2050 REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-25-0000 2068 W REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-26-0000 2062 REDLANDS BLVD Annexation L6-H $ 6.00 0292-064-27-0000 2052 REDLANDS BLVD Annexation L6-H $ 6.00 0292-152-39-0000 2015 PARK AVE Annexation L10-B $ 6.00
0292-153-24-0000 1915 REDLANDS BLVD Annexation L5-A $ 6.00 0292-153-25-0000 1911 REDLANDS BLVD Annexation L5-A $ 6.00 0292-153-26-0000 721 NEVADA ST Annexation L5-A $ 6.00
0292-153-27-0000 721 NEVADA ST Annexation L5-A $ 6.00
0292-154-12-0000 1991 PARK AVE Annexation L8-D $ 6.00
0292-156-21-0000 1717 PARK AVE Annexation L4-V $ 6.00
0292-157-16-0000 1625 W REDLANDS BLVD Annexation L9-A $ 6.00 0292-157-20-0000 560 IOWA ST Annexation L12-J $ 6.00
0292-157-31-0000 1615 REDLANDS BLVD Annexation L5-G $ 6.00 0292-158-15-0000 ALABAMA ST Annexation L11-B $ 6.00
0292-165-15-0000 1890 ORANGE AVE Annexation L6-F $ 6.00 Fiscal Year 2022/23 Page 7 of 11
Redlands Regular Meeting 06-21-2022 688 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0292-166-11-0000 1710 BARTON RD Annexation L4-K $ 6.00
0292-182-30-0000 614 ALABAMA ST Annexation L4-T $ 6.00
0292-182-31-0000 614 ALABAMA ST Annexation L4-T $ 6.00
0292-192-11-0000 301 TENNESSEE ST Annexation L7-E $ 6.00 0292-201-37-0000 141 KANSAS ST Annexation L7-B $ 6.00
0292-201-39-0000 125 KANSAS ST Annexation L7-B $ 6.00
0292-201-40-0000 210 BUSINESS CENTER CT Annexation L7-B $ 6.00 0292-202-17-0000 298 KANSAS ST Annexation L10-A $ 6.00
0292-202-18-0000 KANSAS ST Annexation L10-A $ 6.00
0292-251-10-0000 1280 ALABAMA ST Annexation L12-G $ 6.00 0292-310-07-0000 633 AMIGOS DR Annexation L6-B $ 6.00
0292-310-36-0000 617 AMIGOS DR Annexation L7-F $ 6.00
0292-321-10-0000 1981 W LUGONIA AVE Annexation L4-G $ 6.00 0292-331-15-0000 1910 ORANGE TREE LN Annexation L5-E $ 6.00 0292-331-16-0000 1902 ORANGE TREE LN Annexation L5-E $ 6.00 0292-341-17-0000 1751 PLUM LN Annexation L12-I $ 6.00
0292-341-24-0000 1711 PLUM LN Annexation L11-A $ 6.00
0292-341-25-0000 1741 PLUM LN Annexation L11-A $ 6.00
0292-351-08-0000 1806 ORANGE TREE LN Annexation L11-C $ 6.00 0292-381-08-0000 1653 PLUM LN Annexation L6-G $ 6.00
0292-441-11-0000 1230 INDIANA CT Annexation L5-B $ 6.00 0292-441-12-0000 1226 INDIANA CT Annexation L5-B $ 6.00 0292-441-13-0000 1222 INDIANA CT Annexation L5-B $ 6.00 0292-441-14-0000 1214 INDIANA CT Annexation L5-B $ 6.00 0292-441-15-0000 1210 INDIANA CT Annexation L5-B $ 6.00 0293-172-16-0000 1500 BARTON RD Annexation L4-B $ 27.00 0293-172-17-0000 1536 BARTON RD Annexation L4-B $ 27.00 0293-172-18-0000 1500 BARTON RD Annexation L4-B $ 6.00
0293-421-01-0000 1809 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-02-0000 1812 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-03-0000 1810 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-04-0000 1808 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-05-0000 1806 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-06-0000 1804 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-07-0000 1802 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-08-0000 1800 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-09-0000 1746 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-10-0000 1744 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-11-0000 1742 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-12-0000 1740 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-13-0000 1738 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-14-0000 1736 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-15-0000 1734 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-16-0000 1732 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-17-0000 1730 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-18-0000 1726 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-19-0000 1724 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-20-0000 1720 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-21-0000 1716 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-22-0000 1706 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-23-0000 1700 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-24-0000 1701 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-25-0000 1703 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-26-0000 1705 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-27-0000 1707 MORNING DOVE LN Annexation L12-F $ 6.00 Fiscal Year 2022/23 Page 8 of 11
Redlands Regular Meeting 06-21-2022 689 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
0293-421-28-0000 1709 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-29-0000 1711 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-30-0000 1715 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-31-0000 1717 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-32-0000 1719 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-33-0000 1721 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-34-0000 1723 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-35-0000 1725 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-36-0000 1727 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-37-0000 1729 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-38-0000 1731 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-39-0000 1733 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-40-0000 1735 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-41-0000 1737 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-42-0000 1743 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-43-0000 1747 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-44-0000 1803 MORNING DOVE LN Annexation L12-F $ 6.00 0293-421-45-0000 1805 MORNING DOVE LN Annexation L12-F $ 6.00 0294-091-47-0000 SMILEY RIDGE Annexation L5-F $ 6.00
0294-091-48-0000 1821 SMILEY RIDGE Annexation L5-F $ 6.00 1212-041-01-0000 1021 E PIONEER AVE Annexation L10-F $ 6.00 1212-081-54-0000 1709 DEANNA Annexation L1-B $ 101.35
1212-081-55-0000 1711 DEANNA Annexation L1-B $ 101.35
1212-081-56-0000 1715 DEANNA Annexation L1-B $ 101.35
1212-081-57-0000 1719 DEANNA Annexation L1-B $ 101.35
1212-081-58-0000 1723 DEANNA Annexation L1-B $ 101.35
1212-081-59-0000 1727 DEANNA WY Annexation L1-B $ 101.35 1212-081-60-0000 1731 DEANNA Annexation L1-B $ 101.35
1212-081-61-0000 1712 DEANNA Annexation L1-B $ 101.35
1212-081-62-0000 1708 DEANNA Annexation L1-B $ 101.35
1212-141-01-0000 1009 DOYLE Annexation L1-A $ 92.57
1212-141-02-0000 1013 DOYLE Annexation L1-A $ 92.57
1212-141-03-0000 1017 DOYLE Annexation L1-A $ 92.57
1212-141-04-0000 1021 DOYLE Annexation L1-A $ 92.57
1212-141-05-0000 1025 DOYLE ST Annexation L1-A $ 92.57
1212-141-06-0000 1029 DOYLE Annexation L1-A $ 92.57
1212-141-07-0000 1033 DOYLE Annexation L1-A $ 92.57
1212-141-08-0000 1037 DOYLE AVE Annexation L1-A $ 92.57 1212-141-09-0000 1041 DOYLE Annexation L1-A $ 92.57
1212-141-10-0000 1045 DOYLE Annexation L1-A $ 92.57
1212-141-11-0000 1058 STICKNEY Annexation L1-A $ 92.57
1212-141-12-0000 1054 STICKNEY Annexation L1-A $ 92.57
1212-141-13-0000 1050 STICKNEY Annexation L1-A $ 92.57
1212-141-14-0000 1046 STICKNEY Annexation L1-A $ 92.57
1212-141-15-0000 1042 STICKNEY Annexation L1-A $ 92.57
1212-141-16-0000 1038 STICKNEY CIR Annexation L1-A $ 101.83 1212-141-17-0000 1034 STICKNEY Annexation L1-A $ 101.83 1212-141-18-0000 1030 STICKNEY DR Annexation L1-A $ 101.83 1212-141-19-0000 1026 STICKNEY CIR Annexation L1-A $ 101.83 1212-141-20-0000 1022 STICKNEY AVE Annexation L1-A $ 101.83 1212-141-21-0000 1018 STICKNEY Annexation L1-A $ 101.83 1212-141-22-0000 1014 STICKNEY Annexation L1-A $ 101.83 1212-141-23-0000 1010 STICKNEY Annexation L1-A $ 101.83 1212-141-24-0000 1006 STICKNEY Annexation L1-A $ 101.83 1212-141-25-0000 1007 STICKNEY Annexation L1-A $ 92.57
Fiscal Year 2022/23 Page 9 of 11
Redlands Regular Meeting 06-21-2022 690 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
1212-141-26-0000 1011 STICKNEY Annexation L1-A $ 92.57
1212-141-27-0000 1015 STICKNEY Annexation L1-A $ 92.57
1212-141-28-0000 1019 STICKNEY Annexation L1-A $ 92.57
1212-141-29-0000 1023 STICKNEY Annexation L1-A $ 92.57
1212-141-30-0000 1027 STICKNEY Annexation L1-A $ 92.57
1212-141-31-0000 1031 STICKNEY Annexation L1-A $ 92.57
1212-141-32-0000 1032 DOYLE Annexation L1-A $ 92.57
1212-141-33-0000 1028 DOYLE Annexation L1-A $ 92.57
1212-141-34-0000 1024 DOYLE AVE Annexation L1-A $ 92.57 1212-141-35-0000 1020 DOYLE Annexation L1-A $ 92.57
1212-141-36-0000 1016 DOYLE Annexation L1-A $ 92.57
1212-141-37-0000 1012 DOYLE Annexation L1-A $ 92.57
1212-141-38-0000 1008 DOYLE Annexation L1-A $ 92.57
1212-141-39-0000 1601 DEANNA Annexation L1-B $ 111.48
1212-141-40-0000 1605 DEANNA Annexation L1-B $ 101.35
1212-141-41-0000 1609 DEANNA Annexation L1-B $ 101.35
1212-141-42-0000 1613 DEANNA Annexation L1-B $ 101.35
1212-141-43-0000 1617 DEANNA Annexation L1-B $ 101.35
1212-141-44-0000 1621 DEANNA Annexation L1-B $ 101.35
1212-141-45-0000 1625 DEANNA Annexation L1-B $ 101.35
1212-141-46-0000 1701 DEANNA Annexation L1-B $ 101.35
1212-141-47-0000 1705 DEANNA Annexation L1-B $ 101.35
1212-141-48-0000 1704 DEANNA WY Annexation L1-B $ 101.35 1212-141-49-0000 1700 DEANNA Annexation L1-B $ 101.35
1212-141-50-0000 1622 DEANNA Annexation L1-B $ 101.35
1212-141-51-0000 1618 DEANNA Annexation L1-B $ 101.35
1212-141-52-0000 1614 DEANNA Annexation L1-B $ 101.35
1212-141-53-0000 1606 DEANNA Annexation L1-B $ 101.35
1212-141-54-0000 1602 DEANNA Annexation L1-B $ 111.48
1212-191-60-0000 1572 GROVE ST Annexation L4-W $ 6.00
1212-191-61-0000 1588 GROVE ST Annexation L4-W $ 6.00
1212-191-62-0000 1564 GROVE ST Annexation L4-W $ 6.00
1212-191-63-0000 1560 GROVE ST Annexation L4-W $ 6.00
1212-191-64-0000 1556 GROVE ST Annexation L4-W $ 6.00
1212-191-65-0000 1552 GROVE ST Annexation L4-W $ 6.00
1212-191-66-0000 1548 GROVE ST Annexation L4-W $ 6.00
1212-191-67-0000 1544 GROVE ST Annexation L4-W $ 6.00
1212-191-68-0000 1540 GROVE ST Annexation L4-W $ 6.00
1212-191-69-0000 1536 GROVE ST Annexation L4-W $ 6.00
1212-191-70-0000 1541 KELLY AVE Annexation L4-W $ 6.00
1212-191-71-0000 1545 KELLY AVE Annexation L4-W $ 6.00
1212-191-72-0000 1549 KELLY AVE Annexation L4-W $ 6.00
1212-191-73-0000 1553 KELLY AVE Annexation L4-W $ 6.00
1212-191-74-0000 1557 KELLY AVE Annexation L4-W $ 6.00
1212-191-75-0000 1561 KELLY ST Annexation L4-W $ 6.00
1212-191-76-0000 1565 KELLY ST Annexation L4-W $ 6.00
1212-191-77-0000 1569 KELLY ST Annexation L4-W $ 6.00
1212-191-78-0000 1573 KELLY ST Annexation L4-W $ 6.00
1212-191-79-0000 1577 KELLY ST Annexation L4-W $ 6.00
1212-201-01-0000 1572 NELSON ST Annexation L6-E $ 6.00
1212-201-02-0000 1568 NELSON ST Annexation L6-E $ 6.00
1212-201-03-0000 1560 NELSON ST Annexation L6-E $ 6.00
1212-201-04-0000 1556 NELSON ST Annexation L6-E $ 6.00
1212-201-05-0000 1552 NELSON ST Annexation L6-E $ 6.00
1212-201-06-0000 1548 NELSON ST Annexation L6-E $ 6.00
Fiscal Year 2022/23 Page 10 of 11
Redlands Regular Meeting 06-21-2022 691 of 1716
APN SITUS ADDRESS ANNEXATION CHARGE
City of Redlands
Landscape Maintenance District No. 1 - Appendix D
Fiscal Year 2022/23
Assessment Roll (Sorted by APN)
1212-201-07-0000 1540 NELSON ST Annexation L6-E $ 6.00
1212-201-08-0000 1536 NELSON ST Annexation L6-E $ 6.00
1212-201-09-0000 1528 NELSON ST Annexation L6-E $ 6.00
1212-201-10-0000 1524 NELSON ST Annexation L6-E $ 6.00
1212-201-11-0000 1520 NELSON ST Annexation L6-E $ 6.00
1212-201-12-0000 1346 PARADISE WY Annexation L6-E $ 6.00 1212-201-13-0000 1343 PENNSYLVANIA AVE Annexation L6-E $ 6.00 1212-201-14-0000 1349 PENNSYLVANIA AVE Annexation L6-E $ 6.00 1212-201-15-0000 1350 PARADISE WY Annexation L6-E $ 6.00 1212-201-16-0000 1354 PARADISE WY Annexation L6-E $ 6.00 1212-201-17-0000 1521 MORIARTY ST Annexation L6-E $ 6.00 1212-201-18-0000 1525 MORIARTY ST Annexation L6-E $ 6.00 1212-201-19-0000 1529 MORIARTY ST Annexation L6-E $ 6.00 1212-201-20-0000 1533 MORIARTY ST Annexation L6-E $ 6.00 1212-201-21-0000 1537 MORIARTY ST Annexation L6-E $ 6.00 1212-201-22-0000 1541 MORIARTY ST Annexation L6-E $ 6.00 1212-201-23-0000 1545 MORIARTY ST Annexation L6-E $ 6.00 1212-201-24-0000 1549 MORIARTY ST Annexation L6-E $ 6.00 1212-201-25-0000 1553 MORIARTY ST Annexation L6-E $ 6.00 1212-201-26-0000 1557 MORIARTY ST Annexation L6-E $ 6.00 1212-201-27-0000 1561 MORIARTY ST Annexation L6-E $ 6.00 Summary Fields Value
APN total count: 571
CHARGE total sum: $ 28,784.34
Fiscal Year 2022/23 Page 11 of 11
Redlands Regular Meeting 06-21-2022 692 of 1716
APPENDIX D
ASSESSMENT ROLL
Redlands Regular Meeting 06-21-2022 693 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 694 of 1716
CITY OF REDLANDS
STREET LIGHTING DISTRICT NO. 1
ENGINEER’S REPORT
FOR FISCAL YEAR 2022-2023
CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
Redlands Regular Meeting 06-21-2022 695 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 696 of 1716
ENGINEER’S REPORT AFFIDAVIT
Street Lighting District No. 1
City of Redlands
San Bernardino County, State of California
This Report describes the Street Lighting District No. 1 (“District”) and services therein including the improvements, budgets, parcels and assessments to be levied for Fiscal Year 2022-2023 as they existed at the time of the passage of the Resolution of Intention.
Reference is hereby made to the San Bernardino County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this 1st day of June, 2022
By:
Goutam Dobey
Engineering Manager
R.C.E # 75646
Redlands Regular Meeting 06-21-2022 697 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 698 of 1716
TABLE OF CONTENTS
I. AUTHORITY FOR REPORT
II. GENERAL DESCRIPTION
III. PLANS AND SPECIFICATIONS
IV. IMPROVEMENTS
V. ASSESSMENT DIAGRAM
VI. ESTIMATED COSTS AND ASSESSMENTS
VII. ASSESSMENT ROLL
VIII. PROPOSED BASIS FOR ASSESSMENTS
IX. CALCULATION OF UOB AND INCIDENTAL COSTS FOR FY2022-2023 X. ESTIMATED ASSESSMENTS FOR FY2022-2023
APPENDIX A: CALCULATION OF UOB AND INCIDENTAL COST TABLE APPENDIX B: DISTRICT ASSESSMENT DIAGRAM
APPENDIX C: RESOLUTIONS
APPENDIX D: ASSESSMENT ROLL
Redlands Regular Meeting 06-21-2022 699 of 1716
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 700 of 1716
1 AUTHORITY FOR REPORT
This report is prepared by order of the City Council of the City of Redlands, California (City). This report is in compliance with the requirements of Chapter 1, Article 4, and Chapter 3 of Division 15 of the Streets and Highway Code of the State of California (Landscape and Lighting Act of 1972) and Article XIIID of the California Constitution.
I. GENERAL DESCRIPTION
The City Council of the City of Redlands, California has heretofore elected to form Street Lighting District No. 1 (District) and annexed territories to said District. The boundaries of said District and annexations thereto are entitled “Assessment Diagram of Street Lighting District No. 1,” and are on file in the office of the City Clerk of the City of Redlands.
II. PLANS AND SPECIFICATIONS
All street lights are or will be owned by the City and are provided electrical services by Southern California Edison Company (SCE).
Reference is hereby made to the subject tract or parcel maps and assessment diagrams for the exact location of the parcels covered by the District. The plans and specifications by reference are hereby made a part of this report to the same extent as if said plans and specifications were attached hereto.
III. IMPROVEMENTS
The Landscaping and Lighting Act of 1972 allows the confirmation of benefit assessments for the construction of improvements in addition to maintenance and operation of existing facilities. Assessments will not be levied under the District to fund the installation of street lights during FY2022-2023. Therefore, this report does not include any proposed benefit assessments for the installation of improvements for FY2022-2023.
IV.ASSESSMENT DIAGRAM
The assessment District locations for the Original District and subsequent Annexations shown as Appendix B thereto have been prepared. The assessment diagrams by reference are hereby made a part of this report. The original diagram document used in prior Engineer’s Reports was updated in 2021 for purposes of clarity.
Since there were numerous locations as part of Annexation Nos. 1, 2, 3, 4, 5, etc. they were identified on the diagram as S1-A, S1-B, S1-C or S2-A, S2-B, S2-C, etc. Prefix S is added to the identification on the later Annexations to identify that they are within the District.
The same Annexation description will be used for identification with Sections IX and X of this report
Redlands Regular Meeting 06-21-2022 701 of 1716
2 V. ESTIMATED COSTS AND MAINTENANCE
Since the City owns the street lighting system, all maintenance efforts by the City should be allocated to the District as a direct cost. The Municipal Utilities and Engineering Department has taken the information used in the previous annual report and updated the values based upon the formulas for Unit of Benefit. Southern California Edison (SCE) monthly rates were calculated based upon LS-2 schedule of rates for 100W and 150W high pressure sodium vapor street lights. Because the District costs have historically exceeded the revenue generated by District assessment, it is anticipated that minimal administration and no maintenance will be provided during the 2022-2023 year. As such, the labor amount has been significantly reduced to an estimated value of $6,855 to be spread equally over the number of street lights.
Given these parameters the following is the estimated monthly costs per lamp:
POLES SCE
CHARGE
DEPARTMENT
ADMINISTRATION
MONTHLY
LAMP COST
419 $ 2.82 $ 1.36 $ 1,751
The following information is from the City’s FY2017-2018 Budget:
Power Expenses
City Street Lighting S 15,000
Subtotal S 15,000
Administration
Salaries and Benefits $ 10,893
Maintenance $ 1,101
Subtotal S 11,994
Incidental
Other Professional Services $ 0
Subtotal $ 0
Total Costs S 26,994
2017-2018 Levy $ 25,465
Deficit $ 1,529
Total Parcels Levied 990
The District and Annexations, which are maintained by the City, have been in existence for a number of years. Over the years, the existing assessments have not kept pace with the true annual cost of maintenance and administration.
No new areas are being proposed to be annexed to the District for FY2022-2023.
Redlands Regular Meeting 06-21-2022 702 of 1716
3 VI.ASSESSMENT ROLL
Following the public hearing for FY2022-2023 assessments and the City Council’s approval of the assessments, an assessment roll will be prepared. The assessment roll will include the assessment parcel number, the San Bernardino County Assessor’s parcel number and the confirmed assessment for each parcel. The assessment roll will be filed with the City Clerk and will subsequently be transmitted to the San Bernardino County Auditor/Tax Collector.
VII. PROPOSED BASIS FOR ASSESSMENTS
The City Council has heretofore determined that it will be necessary to utilize the provisions of the Landscaping and Lighting Act of 1972, a benefit assessment act, for the Original District and the subsequent Annexations to the District and to assess benefitting properties in proportion to the benefits that the various properties will receive.
The benefits the properties will receive will be assessed as increments of units of benefit (UOB). The District and the subsequent Annexations consist of various types of development having varying parcel sizes. Since the street lights either have been or will be installed in accordance with customary spacing established by the City, there will be four Assessment Zones based upon a street’s curb-to-curb width.
Assessments proposed for individual parcels within the District and Annexations will be for the benefit received and will be determined based upon the four following Assessment Zones.
Zone 1: This will include all parcels having frontage on streets with curb separation of less than 40’ or greater with 100watt HPSVL at 250’ spacing.
Zone 2: This will include all parcels having frontage on streets with curb separations of less than 40’ with 100 watt HPSVL at 600’ spacing.
Zone 3: This will include all parcels having frontage on streets with curb separations of 40’ or greater and less than 64’ with 150 watt HPSVL at 250’ spacing.
Zone 4: This will include all parcels having frontage on streets with curb separations of 64’ or more with 150 watt HPSVL at 230’ spacing.
Each of these four Assessment Zones will have assessments levied in UOB which is defined as increments of 100’ frontage on public streets, right-of-way or easements. The frontage length and the corresponding UOB are as follows:
FRONTAGE LENGTH UOB
Less than 199’ 1
200’ – 299’ 2
300’ – 399’ 3
And so forth
Redlands Regular Meeting 06-21-2022 703 of 1716
4 The UOB assessments for the four Zones are calculated as follows:
Zone 1: Includes 100 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $8.49. Since the spacing will be 240’ ± 15’, a spacing of 250’ will be used in the calculation.
$8.49 x 12 x 100’ = $20.38 per UOB
500 UOB
Zone 2: Includes 100 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $8.49. Since the spacing will be 600’, a spacing of 600’ will be used in the calculation.
$8.49 x 12 x 100’ = $8.49 per UOB
1200 UOB
Zone 3: Includes 150 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $11.51. Since the spacing will be 265’ ± 15’, a spacing of 250’ will be used in the calculation.
$11.51 x 12 x 100’ = $27.63 per UOB
500 UOB
Zone 4: Includes 150 watt high pressure, sodium vapor luminaries with a monthly billing rate from SCE, a minimal amount of labor (excluding City General Government Overhead and Facilities and Community Services Department maintenance) for a lamp cost of $11.51. Since the spacing will be 215’ ± 15’, a spacing of 230’ will be used in the calculation.
$11.51 x 12 x 100’ = $30.03 per UOB
460 UOB
The incidental expenses are most equitably spread on a UOB basis, which is the same method for spreading the benefit from the direct lighting costs.
Redlands Regular Meeting 06-21-2022 704 of 1716
5 VIII. CALCULATION OF UOB AND INCIDENTAL COSTS FOR FY2022-2023 For a breakdown of the UOB Incidental Costs see Appendix A – Calculation of UOB and Incidental Cost Table
IX.ESTIMATED ASSESSMENTS FOR FY2022-2023
The following calculations presume the on-site development has been completed and include the estimated energy, administration and engineering costs:
Original District (Zone 3) – Parcel Map 11917 APN 0292-032-39, 40, 41, 42 The four parcels will receive one UOB per 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of operation and maintenance to be assessed
N = Number of UOB in Parcel Map 11917
NA = C
A = $621.55/31
A = $20.05 per UOB
Assessment for each parcel:
Parcel 2 - 10 UOB = $200.50
Parcel 3 - 2 UOB = $40.10
Parcel 4 - 3 UOB = $60.15
Parcel 5 - 16 UOB = $320.80
Annexation S1-A – Parcel Map 12450, APN 0167-201-62 thru -65 These parcels are not assessed.
Redlands Regular Meeting 06-21-2022 705 of 1716
6 Annexation S1-B (Zone 4) – Parcel Map 11755 APN 0293-172-16, 17, 18 The seven parcels in Annexation S1-B having street frontage will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-B with street frontage NA = C
A = $273.39/13
A = $21.03 per UOB
Assessment for each parcel:
Parcel 1 - 1 UOB = $21.03
Parcel 3 - 1 UOB = $21.03
Parcel 5 - 1 UOB = $21.03
Parcel 6 - 2 UOB = $42.06
Parcel 7 - 2 UOB = $42.06
Parcel 8 - 4 UOB = $84.12
Parcel 9 - 2 UOB = $42.06
The original parcels have been reconfigured into three Assessor’s Parcels.
Annexation S1-C (Zone 4) – CUP 617 APN 0292-033-11
The one parcel in Annexation S1-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-C
NA = C
A = $231.33/1
A = $231.33 per Parcel
Redlands Regular Meeting 06-21-2022 706 of 1716
7 Annexation S1-D (Zone 3) – MS 184, Parcel Map 12300, APN 0167-231-19, 20, 21 The three parcels in Annexation S1-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-D
NA = C
A = $60.15/3
A = $20.05 per Parcel
Annexation S1-E (Zone 3) – CUP 382 APN 0171-383-19, 20
The two parcels in Annexation S1-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-E
NA = C
A = $40.10/2
A = $20.05 per Parcel
Annexation S1-F (Zone 1) – CRA 606 APN 0169-131-33
The one parcel in Annexation S1-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-F
NA = C
A = $19.45/1
A = $19.45 per Parcel
Redlands Regular Meeting 06-21-2022 707 of 1716
8 Annexation S1-G (Zone 4) – CRA 486 APN 0292-321-10
The one parcel in Annexation S1-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-G
NA = C
A = $105.15/1
A = $105.15 per Parcel
Annexation S1-G (Zone 4) – CRA 486 APN 0292-321-10
The one parcel in Annexation S1-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-G
NA = C
A = $105.15/1
A = $105.15 per Parcel
Annexation S1-H (Zone 4) – CUP 253 APN 0169-411-07
The one parcel in Annexation S1-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-H
NA = C
A = $105.15/1
A = $105.15 per Parcel
Redlands Regular Meeting 06-21-2022 708 of 1716
9 Annexation S1-I (Zone 3) – CRA 608 APN 0169-142-11
The one parcel in Annexation S1-I will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-I
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-J (Zone 3) – CUP 519 APN 0171-331-04
The one parcel in Annexation S1-J will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-J
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-K (Zone 4) – CUP 516 APN 0292-166-11
The one parcel in Annexation S1-K will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-K
NA = C
A = $273.39/1
A = $273.39 per Parcel
Redlands Regular Meeting 06-21-2022 709 of 1716
10 Annexation S1-L (Zone 3) – CUP 518 APN 0169-053-12
The one parcel in Annexation S1-L will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-M (Zone 3) – CUP 522 APN 0172-031-49
The one parcel in Annexation S1-M will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-M
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-N (Zone 1) – Tract 13947 APN 0174-621-01 thru -35 The thirty-five parcels in Annexation S1-N will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-N
NA = C
A = $680.75/35
A = $19.45 per Parcel
Redlands Regular Meeting 06-21-2022 710 of 1716
11 Annexation S1-O (Zone 3) – CUP 521 APN 0292-034-16
The one parcel in Annexation S1-O will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S1-P (Zone 1) – CUP 605 APN 0169-182-02, 03, 04 The three parcels in Annexation S1-P will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $38.90/3
A = $12.97 per Parcel
Annexation S1-Q – City Hall, APN 0171-301-03
The one parcel in Annexation S1-Q is not assessed.
Annexation S1-R – Parcel Map 11904, APN 0176-044-14, 15 The two parcels in Annexation S1-R are not assessed.
Redlands Regular Meeting 06-21-2022 711 of 1716
12 Annexation S1-S (Zone 3) – CUP 278 APN 0171-171-18, 22, 23 The three parcels in Annexation S1-S will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $80.20/3
A = $26.73 per Parcel
Annexation S7-A was originally APN 0171-161-13 and was then changed to APN 0171- 161-14 and -15. Annexation S1-S was originally APN 0171-171-18, -22, and -23.
Assessments for Annexation S7-A and S1-S were combined and then adjusted proportionately. New APNs for both annexations are 0171-161-17 and 0171-171-34.
Assessment spread proportionately.
Annexation S1-T (Zone 3) – CUP 405 APN 0169-343-07
The one parcel in Annexation S1-T will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-T
NA = C
A = $20.05/1
A = $20.05 per Parcel
Redlands Regular Meeting 06-21-2022 712 of 1716
13 Annexation S1-U (Zone 4) – CRA 354, Parcel Map 3131 APN 0292-182-30, 31 The two parcels in Annexation S1-U will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-L
NA = C
A = $42.06/2
A = $21.03 per Parcel
Annexation S1-V (Zone 1) – CRA 346 APN 0292-061-25
The one parcel in Annexation S1-V will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-V
NA = C
A = $19.45/1
A = $19.45 per Parcel
This property is owned by the County of San Bernardino and is not assessed.
Annexation S1-W (Zone 3) – CRA 607 APN 0292-156-21
The one parcel in Annexation S1-L will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-W
NA = C
A = $120.30/1
A = $120.30 per Parcel
Redlands Regular Meeting 06-21-2022 713 of 1716
14 Annexation S1-X (Zone 1) – Tract 12461 APN 1212-191-60 thru -79 The twenty parcels in Annexation S1-X will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of parcels in Annexation S1-X
NA = C
A = $389.00/20
A = $19.45 per Parcel
Annexation S1-Y (Zone 3) – Parcel Map 12022 APN 0169-212-17 thru -27 The eleven parcels in Annexation S1-Y having street frontage will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S1-Y
NA = C
A = $380.95/19
A = $20.05 per UOB
Assessment for each parcel:
Parcel 1 - 3 UOB = $60.15
Parcel 2 - 1 UOB = $20.05
Parcel 3 - 1 UOB = $20.05
Parcel 4 - 2 UOB = $40.10
Parcel 5 - 4 UOB = $80.20
Parcel 6 - 3 UOB = $60.15
Parcel 7 - 1 UOB = $20.05
Parcel 8 - 1 UOB = $20.05
Parcel 9 - 1 UOB = $20.05
Parcel 10 - 1 UOB = $20.05
Parcel 11 - 1 UOB = $20.05
Redlands Regular Meeting 06-21-2022 714 of 1716
15 Annexation S2-A (Zone 3) – Parcel Map 12330 APN 0292-153-24, 25, 26, 27 The four parcels in Annexation S2-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-A
NA = C
A = $240.60/12
A = $20.05 per UOB
Assessment for each parcel:
Parcel 1 - 4 UOB = $80.20
Parcel 3 - 4 UOB = $80.20
Parcel 5 - 2 UOB = $40.10
Parcel 4 - 2 UOB = $40.10
Annexation S2-B (Zone 3) – Parcel Map 12940 APN 0292-441-11 thru 15 The five parcels in Annexation S2-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-B
NA = C
A = $60.15/5
A = $12.03 per Parcel
Annexation S2-C (Zone 3) – MS 184, Parcel Map 12300, APN 0167-231-19, 20, 21 This annexation is a duplication of Annexation S1-D and has been removed.
Redlands Regular Meeting 06-21-2022 715 of 1716
16 Annexation S2-D (Zone 1) – Tract 14556 APN 0176-441-18 thru 27 The ten parcels in Annexation S2-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-D
NA = C
A = $330.65/10
A = $33.07 per Parcel
Annexation S2-E – CRA 611 APN 0174-241-31
This annexation is not assessed.
Annexation S2-F (Zone 3) – MS 196 APN 0292-331-15, 16
The two parcels in Annexation S2-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-F
NA = C
A = $160.40/2
A = $80.20 per Parcel
Annexation S2-G Parcel Map 11189 APN 0294-091-48, 48
The two parcels in Annexation S2-G are not assessed.
Redlands Regular Meeting 06-21-2022 716 of 1716
17 Annexation S2-H (Zone 4) – CRA 615 APN 0292-157-31
The one parcel in Annexation S2-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S2-H
NA = C
A = $21.03/1
A = $21.03 per Parcel
Annexation S3-A (Zone 3) – CRA 517 APN 0169-321-01, 02
The two parcels in Annexation S3-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-A
NA = C
A = $80.20/2
A = $40.10 per Parcel
Annexation S3-B (Zone 1) – CRA 628 APN 0292-310-07
The one parcel in Annexation S3-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-B
NA = C
A = $19.45/1
A = $19.45 per Parcel
Redlands Regular Meeting 06-21-2022 717 of 1716
18 Annexation S3-C (Zone 3) – CRA 624 APN 0169-281-39
The one parcel in Annexation S3-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-C
NA = C
A = $20.05/1
A = $20.05 per Parcel
Annexation S3-D (Zone 3) – CRA 305 APN 0167-271-61
The one parcels in Annexation S3-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-D
NA = C
A = $100.25/1
A = $100.25 per Parcel
Annexation S3-E (Zone 1) – Tract 13575 APN 1212-201-01 thru -27 The twenty-seven parcels in Annexation S3-E will receive an equal benefit assessment:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-E
NA = C
A = $700.20/27
A = $25.93 per Parcel
Redlands Regular Meeting 06-21-2022 718 of 1716
19 Annexation S3-F (Zone 3 & 4) – CUP 550 APN 0292-165-15 The one parcel in Annexation S3-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-F
NA = C
A = $222.51/1
A = $222.51 per Parcel
Annexation S3-G (Zone 1) – CRA 623 APN 0292-381-08
The one parcel in Annexation S3-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-G
NA = C
A = $19.45/1
A = $19.45 per UOB
Redlands Regular Meeting 06-21-2022 719 of 1716
20 Annexation S3-H (Zone 4) – CUP 542 APN 0292-064-13, 17, 21 thru 27 The nine parcels in Annexation S3-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-A
NA = C
A = $567.81/27
A = $21.03 per UOB
Assessment for each parcel:
Parcel 1 - 4 UOB = $84.12
Parcel 2 - 2 UOB = $42.06
Parcel 3 - 2 UOB = $42.06
Parcel 4 - 7 UOB = $147.21
Parcel 5 - 4 UOB = $84.12
Parcel 6 - 2 UOB = $42.06
Parcel 7 - 1 UOB = $21.03
Parcel 8 - 1 UOB = $21.03
Parcel 9 - 4 UOB = $84.12
Annexation S3-I – there is no Annexation S3-I
Annexation S3-J (Zone 3) – MS 201 APN 0171-341-33
The one parcel in Annexation S3-J will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S3-J
NA = C
A = $80.20/1
A = $80.20 per Parcel
Redlands Regular Meeting 06-21-2022 720 of 1716
21 Annexation S4-A (Zone 4) – MS 213, Parcel Map 13978 APN 0172-301-14, 15, 16, 17 The four parcels in Annexation S4-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-A
NA = C
A = $63.09/3
A = $21.03 per UOB
Assessment for each parcel:
Parcel 1 - 2 UOB = $25.24
Parcel 2 - 1 UOB = $12.62
Parcel 3 - 1 UOB = $12.62
Parcel 4 - 1 UOB = $12.62
Annexation S4-B (Zone 3) – MS 211 APN 0292-201-36, 39
The two parcels in Annexation S4-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-B
NA = C
A = $100.25/5
A = $20.05 per UOB
Assessment for each parcel:
Parcel 1 - 2 UOB = $40.10
Parcel 2 - 3 UOB = $60.15
Parcel 2 lot line was adjusted with the property to the north. The assessment was spread proportionately - $47.57 to APN 0292-201-39 and $12.58 to APN 0292-201-40.
Redlands Regular Meeting 06-21-2022 721 of 1716
22 Annexation S4-C (Zone 4) – CUP 559 APN 0171-202-30
The one parcel in Annexation S4-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-C
NA = C
A = $40.10/1
A = $40.10 per Parcel
Annexation S4-D (Zone 1) – CRA 636 APN 0169-043-14
The one parcel in Annexation S4-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-D
NA = C
A = $58.35/1
A = $58.35 per Parcel
Annexation S4-E (Zone 4) – CUP 546 APN 0292-192-11
The one parcel in Annexation S4-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-E
NA = C
A = $231.33
A = $231.33 per UOB
Redlands Regular Meeting 06-21-2022 722 of 1716
23 Annexation S4-F (Zone 1) – CUP 641 APN 0292-310-36
The two parcels in Annexation S4-F will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-G
NA = C
A = $38.90/2
A = $19.45 per UOB
The two parcels were subsequently combined into a single parcel and the full assessment is on the one parcel.
Annexation S4-G (Zone 4) – CRA 640 APN 0169-301-08, 10, 11 The three parcels in Annexation S4-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessment are as follows:
A = Assessment per UOB
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB in Annexation S4-C
NA = C
A = $21.03/3
A = $7.01 per Parcel
Annexation S4-H (Zone 4) - CUP 562 APN 0292-064-17
The one parcel in Annexation S4-H will receive four UOB assessments for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S4-H
NA = C
A = $84.12/1
A = $84.12 per Parcel
Note that Annexation S4-H is already assessed in Annexation S3-H. Therefore, the assessment in Annexation S4-H is $0
Redlands Regular Meeting 06-21-2022 723 of 1716
24 Annexation S4-I (Zone 1) - CUP 548 APN 0169-313-16
The one parcel in Annexation S4-I will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S4-1
NA = C
A = $77.80 /1
A = $77.80 per Parcel
Annexation S5-A – CRA 637 APN 0169-281-23
This property became a City owned parcel and was removed from the assessment roll.
Annexation S5-B (Zone 1) - Tract 10179 APN 0167-851-39 thru 56, 0167-861-37 thru 54 The thirty-six parcels in Annexation S5-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S5-B
NA = C
A = $505.70/36
A = $14.05 per Parcel
Redlands Regular Meeting 06-21-2022 724 of 1716
25 Annexation S5-C (Zone 1) - CUP 574 APN 0171-202-33
The one parcel in Annexation S5-C will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S5-C
NA = C
A = $19.45/1
A = $19.45 per Parcel
Annexation S5-D (Zone 3) - CRA 642 APN 0292-154-12
The one parcel in Annexation S5-D will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation 85·0
NA = C
A = $100.25/1
A = $100.25 per Parcel
Annexation S5-E (Zone 1) - MS 216-B Parcel Map 14090 APN 0174-021-41, 42 The two parcels in Annexation S5-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S5-E
NA = C
A = $38.90/2
A = $19.45 per Parcel
Redlands Regular Meeting 06-21-2022 725 of 1716
26 Annexation S6-A (Zone 4) - CRA 648 APN 0292-157-16
The one parcel in Annexation S6-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S6-A
NA = C
A = $189.27/1
A = $189.27 per Parcel
Annexation S6-B (Zone 1) - CUP 581 APN 0171-203-13
The one parcel in Annexation S6-B will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S6-B
NA = C
A = $38.90/1
A = $38.90 per Parcel
Redlands Regular Meeting 06-21-2022 726 of 1716
27 Annexation S7-A (Zone 3): MS 228 APN 0171-161-17
The two parcels in Annexation S7-A will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-A
NA = C
A = $200.50/2
A = $100.25 per Parcel
Annexation S7-A was originally APN 0171-161-13 and was then changed to APN 0171- 161-14 and -15. Annexation S1-S was originally APN 0171-171-18, -22, and -23.
Assessments for Annexation S7-A and S1-S were combined and then adjusted proportionately. New APNs for both annexations are 0171-161-17 and 0171-171-34.
Assessment spread proportionately.
Annexation S7-B (Zone 3): CRA 639 APN 0292-152-39
The one parcel in Annexation S7-B will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-B
NA = C
A = $100.25/1
A = $100.25 per Parcel
Annexation S7-C (Zone 4) - CUP 602 APN 0292-063-48
The one parcel in Annexation S7-C will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-C
NA = C
A = $42.06/1
A = $42.06 per Parcel
Redlands Regular Meeting 06-21-2022 727 of 1716
28 Annexation S7-D (Zone 1) - CUP 590 APN 0171-332-30
The one parcel in Annexation S7-D will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-D
NA = C
A = $38.90/1
A = $38.90 per Parcel
Annexation S7-E (Zones 1 & 3) - CUP 607 APN 0167-101-13 The one parcel in Annexation S7-E will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-E
NA = C
A = $198.10/1
A = $198.10 per Parcel
Annexation S7-F (Zone 1) - CUP 577 APN 1212-041-01
The one parcel in Annexation S7-F will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-F
NA = C
A = $77.80/1
A = $77.80 per Parcel
Redlands Regular Meeting 06-21-2022 728 of 1716
29 Annexation S7-G (Zone 1) - CUP 541 APN 0174-261-15
The one parcel in Annexation S7-G will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-G
NA = C
A = $155.60/1
A = $155.60 per Parcel
Annexation S7-H (Zone 2) - Tract 14790-1 APN 0176-521-01 thru -13, -18 thru -23, -27 thru -32, APN 0176-531-01, 02, 03, 07, 08, 09, 12, 13, 18, 20, 21, 22, 24, 25, 26 The forty parcels in Annexation S7-H will receive an equal benefit assessment.
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S7-H
NA = C
A = $1,660.00/40
A = $41.50 per Parcel
Annexation S8-A (Zone 3) - CUP 584 APN 0172-121-03
The one parcel in Annexation S8-A will receive the entire benefit assessment. The calculations for the assessment are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S8-A
NA = C
A = $20.05/1
A = $20.05 per Parcel
Redlands Regular Meeting 06-21-2022 729 of 1716
30 Annexation S8-B (Zone 3) - CRA 666 APN 0292-158-17
The one parcel in Annexation S8-B will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S8-B
NA = C
A = $40.10/1
A = $40.10 per Parcel
Annexation S8-C (Zone 3) - CRA 616
The portion of this property that was Annexation S8-C is no longer assessed.
Annexation S9-A (Zones 1 & 4) - Tract 15589 APN 0293-421-01 thru -45 The forty-five parcels in Annexation S9-A will receive an equal benefit assessment.
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-A
NA = C
A = $202.40/45
A = $4.50 per Parcel
Annexation S9-B (Zone 1) - MS 221, Parcel Map 14285 APN 0174-281-33, 34, 35, 37 The four parcels in Annexation S9-B will receive an equal benefit assessment. The calculation for the assessment follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-B
NA = C
A = $58.35/4
A = $14.59 per Parcel
Redlands Regular Meeting 06-21-2022 730 of 1716
31 Annexation S9-C – there is no Annexation S9-C
Annexation S9-D (Zone 3) - CUP 617 APN 0292-033-13
The one parcel in Annexation S9-D will receive the entire benefit assessment. The calculation for the assessment follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-D
NA= C
A = $80.20/1
A = $80.20 per Parcel
Annexation S9-E (Zone 1) - CRA 670 APN 0292-157-20
The one parcel in Annexation S9-E will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-E
NA = C
A= $19.45/1
A = $19.45 per Parcel
Annexation S9-F (Zone 3) - CUP 629
The one parcel in Annexation S9-F will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S9-F
NA = C
A = $100.25/1
A = $100.25 per Parcel
Redlands Regular Meeting 06-21-2022 731 of 1716
32 Annexation S10-A (Zones 1 & 3) - Tract 15040 APN 0174-631-01 thru -09, -11 thru - 35, -37 thru -58, -63, -64
The fifty-eight parcels in Annexation S10-A will each receive an equal benefit assessment.
The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N =Number of Parcels in Annexation S10-A
NA = C
A = $1,461.15/58
A = $25.19 per Parcel
Annexation S10-B (Zones 1 & 4) - Tract 15832 APN 0172-301-18 thru 22, 26 The six parcels in Annexation S10-B will each receive an equal benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-B
NA = C
A = $140.89/6
A = $23.48 per Parcel
Annexation S10-C (Zones 1, 3 & 4) - TR 15937 APN 0168-731-01 thru -25, APN 0168- 741-01 thru -78, APN 0168-751-01 thru -56
The one hundred fifty-nine parcels in Annexation S10-C will each receive an equal benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-C
NA = C
A = $2,722.64 /159
A = $17.12 per Parcel
Redlands Regular Meeting 06-21-2022 732 of 1716
33 Annexation S10-D (Zone 1) - Tract 16015 APN 1212-021-01 thru -62 The sixty-two parcels in Annexation S10-D will each receive an equal benefit assessment.
The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-D
NA = C
A = $1,050.30/62
A = $16.94 per Parcel
Annexation S10-E (Zones 1 & 3) - Tract 16029 APN 0167-081-13 thru -45 The thirty-three parcels in Annexation S10-E will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $453.95/33
A = $13.76 per Parcel
Annexation S10-F (Zones 1 & 4) - Tract 16032 APN 0170-481-20 thru -34 The fifteen parcels in Annexation S10-F will each receive an equal benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-F
NA = C
A = $259.17 /15
A = $17.28 per Parcel
Redlands Regular Meeting 06-21-2022 733 of 1716
34 Annexation S10-G (Zone 1) - Tract 16082 APN 0172-091-24 thru 36 The thirteen parcels in Annexation S1O-G will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-G
NA = C
A= $350.10/13
A = $26.93 per Parcel
Annexation S10-H (Zones 1 & 4) - Tract 16101 APN 0168-771-01 thru -50, APN 0168- 781-01 thru -34, APN 0168-791-01 thru -28, APN 0168-801-01 thru -38 The one hundred fifty parcels in Annexation S10-H will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-H
NA = C
A = $2,289.87/150
A = $15.27 per Parcel
Redlands Regular Meeting 06-21-2022 734 of 1716
35 Annexation S10-I (Zones 1 & 4) - MS 253 (PM 15530) and MS 255 (PM 15617) APN 0292-153-28, -30 thru -43
The fifteen parcels in Annexation S10-I will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment/Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-I
NA=C
A = $435.80/22
A = $19.81 per UOB
Assessment for each Parcel in PM 15530 (except Parcel 2):
APN 0292-153-28, 30 thru 41
Parcel 1 - 3 UOB = $59.43
Parcel 3 - 1 UOB = $19.81
Parcel 4 - 3 UOB = $59.43
Parcel 5 - 1 UOB = $19.81
Parcel 6 - 1 UOB = $19.81
Parcel 7 - 1 UOB = $19.81
Parcel 8 - 1 UOB = $19.81
Parcel 9 - 1 UOB = $19.81
Parcel 10 - 1 UOB = $19.81
Parcel 11 - 1 UOB = $19.81
Parcel 12 - 4 UOB = $79.24
Parcel 13 - 1 UOB = $19.81
Parcel 14 - 1 UOB = $19.81
Assessment for each Parcel in PM 15530:
APN 0292-153-42, 43
Parcel 1 - 1 UOB = $19.81
Parcel 3 - 1 UOB = $19.81
Redlands Regular Meeting 06-21-2022 735 of 1716
36 Annexation S10-J (Zone 4) - MS 252 (PM 15492) APN 0169-011-32 thru -35, -38, -39 The original five parcels in Annexation S10-J will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels in Annexation S10-J
NA = C
A = $147.21/5
A = $29.44 per Parcel for APN -32 thru -35
APN 0169-011-36 was split into APN 0169-011-38 and -39.
Therefore, A = $14.72 per Parcel for APN -38 and -39
Annexation S10-K (Zones 1 & 4) - CRA 720, PM 17658, APN 0292-154-22 thru -25 The four parcels in Annexation S7-K will receive one UOB assessment for 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment
C = Cost of SCE UOB and Incidental Expenses
N = Number of UOB
NA = C
A = $139.31/7
A = $19.45 per UOB (Zone 1)
A = $21.03 per UOB (Zone 4)
Assessment for each parcel:
Parcel 1 - Zone 1 - 2 UOB / Zone 4 - 2 UOB = $80.96
Parcel 2 - Zone 1 - 1 UOB = $19.45
Parcel 3 - Zone 1 - 1 UOB = $19.45
Parcel 4 - Zone 1 - 1 UOB = $19.45
Annexation S10-L – there is no Annexation S10-L
Redlands Regular Meeting 06-21-2022 736 of 1716
37 Annexation S10-M (Zone 1) - CRA 679 - APN 0292-310-42 The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and incidental Expenses
N = Number of Parcels
NA = C
A = $19.45/1
A = $19.45 per Parcel
Annexation S10-N (Zone 3) - CUP 35R2 - APN 0173-251-21
The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:
A =Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $60.15/1
A = $60.15 per Parcel
Annexation S10-O (Zone 3) - CUP 355 Rev. 8 - APN 0172-121-10, 11, 14 The three parcels will receive an equal benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $80.20/3
A = $26.73 per Parcel
Redlands Regular Meeting 06-21-2022 737 of 1716
38 Annexation S10-P (Zone 3) - CUP 543 - APN 0171-431-05 The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $120.30/1
A = $120.30 per Parcel
Annexation S10-Q (Zones 1 & 2) - MS 234 (PM 14891) - APN 0169·272-29, APN 0169- 281-45, 46
The three parcels will receive one UOB per 100 feet of parcel frontage in accordance with this report. The calculations for the assessments are as follows:
A = Assessment per UOB
C = Cost of operation and maintenance to be assessed
N = Number of UOB
NA = C
A = $196.38/12
A = $16.37 per UOB
Assessment for Each Parcel
Parcel 29 - 4 UOB = $65.48
Parcel 45 - 6 UOB = $98.22
Parcel 46 - 2 UOB = $32.74
Redlands Regular Meeting 06-21-2022 738 of 1716
39 Annexation S10-R (Zone 3) - MS 251 (PM 15414) APN 0176-014-16, 17 The two parcels will receive an equal benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $60.15/2
A = $30.08 per Parcel
Annexation S10-S (Zones 1 & 3) - Tract 14790-2 APN 0294-181-02 thru -15, APN 0294-191-01 thru -04, -06 thru -12, -16 thru -20,
APN 0294-201-09, -11, -13, -15, -19, -21, -27, -28,
APN 0294-211-02 thru -04, -06 thru -10, -12, -13
The forty-eight parcels in Annexation S10-S will each receive an equal benefit assessment.
The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $2,378.05/48
A = $49.54 per Parcel
Annexation S10-T (Zones 1 & 3) - Tract 14790-3 APN 0294-222-01 thru -12, APN 0294-232-01 thru -07, APN 0294-242-01 thru -06, APN 0294-252-01 thru -13, APN 0294-262-01 thru -13
The fifty-one parcels in Annexation S10-T will each receive an equal benefit assessment.
The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $1,842.70/51
A = $36.13 per Parcel
Redlands Regular Meeting 06-21-2022 739 of 1716
40 Annexation S10-U (Zones 1, 3 & 4) - Tract 15532 APN 0168-271-13 thru -48 The thirty-six parcels in Annexation S10-U will each receive an equal benefit assessment.
The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $515.40/36
A = $14.32 per Parcel
Annexation S10-V (Zone 1) - CUP 652 - APN 0171-011-67
The one parcel will receive entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of SCE UOB and Incidental Expenses
N = Number of Parcels
NA = C
A = $19.45/1
A = $19.45 per Parcel
APN 0171-011-54 was the original Annexation 10-V. That parcel was merged with the parcel immediately to the east (APN 0171-011-45). The new parcel was assigned APN 0171-011-67.
Annexation S10-W (Zone 1) - MS 240 (PM 14912) - APN 0292-201-22 The one parcel will receive the entire benefit assessment. The calculations for the assessments are as follows:
A = Assessment per Parcel
C = Cost of Incidental Expenses
N = Number of Parcels
NA = C
A = $19.45/1
A = $19.45 per Parcel
This parcel has been subdivided and is not assessed.
Redlands Regular Meeting 06-21-2022 740 of 1716
41 * * * * * * * * * * * *
The City Council will hold a public meeting on June 21, 2022 to determine the assessments based upon the costs for FY2022-2023 which are anticipated to be incurred by the City and which are to be recovered through assessments as required by the Landscaping and Lighting District Act of 1972.
Redlands Regular Meeting 06-21-2022 741 of 1716
Redlands Regular Meeting 06-21-2022 742 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
Redlands Regular Meeting 06-21-2022 743 of 1716
APPENDIX A
CALCULATION OF MAINTENANCE AND INCIDENTAL COST TABLE
Redlands Regular Meeting 06-21-2022 744 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 745 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Original District Annexation S1-B Annexation S1-C Annexation S1-D Annexation S1-E Annexation S1-F Annexation S1-G Annexation S1-H Annexation S1-I Annexation S1-J Annexation S1-K Annexation S1-L Annexation S1-M Annexation S1-N Annexation S1-O Annexation S1-P Description PM 11917 PM 11755 CUP 617 MS 184 CUP 382 CRA 606 CRA 486 CUP 253 CRA 608 CUP 519 CUP 516 CUP 518 CUP 522 Tract 13947 CUP 521 CUP 605 Original
Parcels
APN 292-032-39
THRU 42
APN 293-172-16
THRU 18 APN 292-033-11
APN 167-231-19
THRU 21
APN 171-383-19
& 20 APN 169-131-33 APN 292-321-10 APN 169-411-07 APN 169-142-11 APN 171-331-04 APN 292-166-11 APN 169-053-12 APN 172-031-49 APN 174-621-01
THRU 35 APN 292-034-16
APN 169-182-02
THRU 04
Zone 3 4 4 3 3 1 4 4 3 3 4 3 3 1 3 1
Unit of
Benefit/Zone
Zone 1 UOB 0 0 0 0 0 1 0 0 0 0 0 0 0 35 0 2
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 31 0 0 3 2 0 0 0 1 1 0 1 1 0 1 0
Zone 4 UOB 0 13 11 0 0 0 5 5 0 0 13 0 0 0 0 0
TOTAL UOB
per Zone 31 13 11 3 2 1 5 5 1 1 13 1 1 35 1 2
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:
Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ - $ - $ - $ - $ 20 $ - $ - $ - $ - $ - $ - $ - $ 713 $ - $ 41 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ 857 $ - $ - $ 83 $ 55 $ - $ - $ - $ 28 $ 28 $ - $ 28 $ 28 $ - $ 28 $ - Zone 4 $ - $ 390 $ 330 $ - $ - $ - $ 150 $ 150 $ - $ - $ 390 $ - $ - $ - $ - $ - SUBTOTAL $ 857 $ 390 $ 330 $ 83 $ 55 $ 20 $ 150 $ 150 $ 28 $ 28 $ 390 $ 28 $ 28 $ 713 $ 28 $ 41 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
APPLIED
UOB &
EXPENSES $ 857 $ 390 $ 330 $ 83 $ 55 $ 20 $ 150 $ 150 $ 28 $ 28 $ 390 $ 28 $ 28 $ 713 $ 28 $ 41 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (235) $ (117) $ (99) $ (23) $ (15) $ (1) $ (45) $ (45) $ (8) $ (8) $ (117) $ (8) $ (8) $ (33) $ (8) $ (2)
BALANCE
TO LEVY $ 856.53 $ 390.39 $ 330.33 $ 82.89 $ 55.26 $ 20.38 $ 150.15 $ 150.15 $ 27.63 $ 27.63 $ 390.39 $ 27.63 $ 27.63 $ 713.30 $ 27.63 $ 40.76 Total # of
Parcels 4 3 1 3 2 1 1 1 1 1 1 1 1 35 1 3
Total Parcels
Levied 4 3 1 3 2 1 1 1 1 1 1 1 1 35 1 3
Total
Assessment
Allowable $ 621.55 $ 273.39 $ 231.33 $ 60.15 $ 40.10 $ 19.45 $ 105.15 $ 105.15 $ 20.05 $ 20.05 $ 273.39 $ 20.05 $ 20.05 $ 680.75 $ 20.05 $ 38.91 Redlands Regular Meeting 06-21-2022 746 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S1-S Annexation S1-T Annexation S1-U Annexation S1-V Annexation S1-W Annexation S1-X Annexation S1-Y Annexation S2-A Annexation S2-B Annexation S2-D Annexation S2-F Annexation S2-H Annexation S3-A Annexation S3-B Annexation S3-C Annexation S3-D Description CUP 278 CUP 405 CRA 354 CRA 346 CRA 607 Tract 12461 PM 12022 PM 12330 PM 12940 Tract 14556 MS 196 CRA 615 CRA 517 CRA 628 CRA 624 CRA 305 Original
Parcels
APN 171-171-18,
22 & 23
Subsequently,S1-S
and S7-A
resubdivided.
Proportionate
assessments levied
to 0171-171-34 for
for S1-S APN 169-343-07
APN 292-182-30
& 31 APN 292-061-25 APN 292-156-21
APN 1212-191-60
THRU 79
APN 169-212-17
THRU 27
APN 292-153-24
THRU 27
APN 292-441-11
THRU 15
APN 176-441-18
THRU 27
APN 292-331-15
& 16 APN 292-157-31
APN 169-321-01
& 02 APN 292-310-07 APN 169-281-39 APN 167-271-61
Zone 3 3 4 Owned by County 3 1 3 3 3 1 3 4 3 1 3 3
Unit of
Benefit/Zone
Zone 1 UOB 0 0 0 0 0 20 0 0 0 17 0 0 0 1 0 0
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 4 1 0 0 6 0 19 12 3 0 8 0 4 0 1 5
Zone 4 UOB 0 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0
TOTAL UOB
per Zone 4 1 2 0 6 20 19 12 3 17 8 1 4 1 1 5
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:
Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ - $ - $ - $ - $ 408 $ - $ - $ - $ 346 $ - $ - $ - $ 20 $ - $ - Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ 111 $ 28 $ - $ - $ 166 $ - $ 525 $ 332 $ 83 $ - $ 221 $ - $ 111 $ - $ 28 $ 138 Zone 4 $ - $ - $ 60 $ - $ - $ - $ - $ - $ - $ - $ - $ 30 $ - $ - $ - $ - SUBTOTAL $ 111 $ 28 $ 60 $ - $ 166 $ 408 $ 525 $ 332 $ 83 $ 346 $ 221 $ 30 $ 111 $ 20 $ 28 $ 138 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
APPLIED
UOB &
EXPENSES $ 111 $ 28 $ 60 $ - $ 166 $ 408 $ 525 $ 332 $ 83 $ 346 $ 221 $ 30 $ 111 $ 20 $ 28 $ 138 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (30) $ (8) $ (18) $ - $ (45) $ (19) $ (144) $ (91) $ (23) $ (16) $ (61) $ (9) $ (30) $ (1) $ (8) $ (38)
BALANCE
TO LEVY $ 110.52 $ 27.63 $ 60.06 $ - $ 165.78 $ 407.60 $ 524.97 $ 331.56 $ 82.89 $ 346.46 $ 221.04 $ 30.03 $ 110.52 $ 20.38 $ 27.63 $ 138.15 Total # of
Parcels 3 1 2 1 1 20 11 4 5 10 2 1 2 1 1 1
Total Parcels
Levied 3 1 2 0 1 20 11 4 5 10 2 1 2 1 1 1
Total
Assessment
Allowable $ 80.19 $ 20.05 $ 42.06 $ - $ 120.30 $ 389.00 $ 380.95 $ 240.60 $ 60.15 $ 330.70 $ 160.40 $ 21.03 $ 80.20 $ 19.45 $ 20.05 $ 100.25 Redlands Regular Meeting 06-21-2022 747 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S3-E Annexation S3-F Annexation S3-G Annexation S3-H Annexation S3-J Annexation S4-A Annexation S4-B Annexation S4-C Annexation S4-D Annexation S4-E Annexation S4-F Annexation S4-G Annexation S4-H Annexation S4-I Annexation S5-B Annexation S5-C Description Tract 13575 CUP 550 CRA 623 CUP 542 MS 201 MS 213 MS 211 CUP 559 CUP 636 CRA 546 CRA 641 CRA 640 CUP 562 CUP 548 Tract 10179 CUP 574 Original
Parcels
APN 1212-701-01
THRU 27 APN 292-165-15 APN 292-381-08
APN 292-064-13,
17, 21 THRU 27 APN 171-341-33
APN 172-301-14
THRU 17
APN 292-201-36
& 37
Subsequently 36
became 38 APN 171-202-30 APN 169-043-14 APN 292-192-11 APN 292-310-36 APN 169-301-08,
10, 11 APN 292-064-17 APN 169-313-16
APN 167-861-37
THRU 54; APN
167-851-39
THRU 56 APN 171-202-33
Zone 1 3 & 4 1 4 3 4 3 3 1 4 1 4 See ANX S3-H 1 1 1
Unit of
Benefit/Zone
Zone 1 UOB 36 0 1 0 0 0 0 0 3 0 2 0 0 4 26 1
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 0 9 0 0 4 0 5 2 0 0 0 0 0 0 0 0
Zone 4 UOB 0 2 0 27 0 3 0 0 0 11 0 1 0 0 0 0
TOTAL UOB
per Zone 36 11 1 27 4 3 5 2 3 11 2 1 0 4 26 1
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:
Unit of Benefit
Assessment/
Zone
Zone 1 $ 734 $ - $ 20 $ - $ - $ - $ - $ - $ 61 $ - $ 41 $ - $ - $ 82 $ 530 $ 20 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ - $ 249 $ - $ - $ 111 $ - $ 138 $ 55 $ - $ - $ - $ - $ - $ - $ - $ - Zone 4 $ - $ 60 $ - $ 811 $ - $ 90 $ - $ - $ - $ 330 $ - $ 30 $ - $ - $ - $ - SUBTOTAL $ 734 $ 309 $ 20 $ 811 $ 111 $ 90 $ 138 $ 55 $ 61 $ 330 $ 41 $ 30 $ - $ 82 $ 530 $ 20 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
APPLIED
UOB &
EXPENSES $ 734 $ 309 $ 20 $ 811 $ 111 $ 90 $ 138 $ 55 $ 61 $ 330 $ 41 $ 30 $ - $ 82 $ 530 $ 20 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (34) $ (86) $ (1) $ (243) $ (30) $ (27) $ (38) $ (15) $ (3) $ (99) $ (2) $ (9) $ - $ (4) $ (24) $ (1)
BALANCE
TO LEVY $ 733.68 $ 308.73 $ 20.38 $ 810.81 $ 110.52 $ 90.09 $ 138.15 $ 55.26 $ 61.14 $ 330.33 $ 40.76 $ 30.03 $ - $ 81.52 $ 529.88 $ 20.38 Total # of
Parcels 27 1 1 9 1 4 2 1 1 1 1 3 1 1 36 1
Total Parcels
Levied 27 1 1 9 1 4 2 1 1 1 1 3 0 1 36 1
Total
Assessment
Allowable $ 700.11 $ 222.51 $ 19.45 $ 567.81 $ 80.20 $ 63.10 $ 100.25 $ 40.10 $ 58.35 $ 231.33 $ 38.90 $ 21.03 $ - $ 77.80 $ 505.80 $ 19.45 Redlands Regular Meeting 06-21-2022 748 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S5-D Annexation S5-E Annexation S6-A Annexation S6-B Annexation S7-A Annexation S7-B Annexation S7-C Annexation S7-D Annexation S7-E Annexation S7-F Annexation S7-G Annexation S7-H Annexation S8-A Annexation S8-B Annexation S9-A Annexation S9-B Description CRA 642 MS 216-B CRA 648 CUP 581 MS 228 CRA 639 CUP 602 CUP 590 CUP 607 CUP 577 CUP 541 Tract 14790-1 CUP 584 CRA 666 Tract 15589 MS 221 Original
Parcels APN 292-154-12
APN 174-021-41
& 42 APN 292-157-16 APN 171-203-13
APN 171-161-14
& 15
Subsequently, S1-
S and S7-H were
resubdivided.
Proportionate
assessments levied
to 0171-161-17 for
for S7-A APN 292-152-39 APN 292-063-48 APN 171-332-30 APN 167-101-13 APN 1212-041-01 APN 174-261-15 APN 176-521-01
THRU 13, 18
THRU 23, 27
THRU 32, APN
176-531-01 THRU
03, 07 THRU 09,
12 THRU 14, 18,
20 THRU 25
Subsequently,
0176-531-14 was
changed to -26 APN 172-121-03
APN 292-158-03
Subsequently, 03
was changed to 17
APN 293-421-01
THRU 45
APN 174-281-33,
34, 35, 37
Zone 3 1 4 1 3 3 4 1 1 & 3 1 1 2 3 3 1 & 4 1
Unit of
Benefit/Zone
Zone 1 UOB 0 2 0 2 0 0 0 2 4 4 8 0 0 0 5 3
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 125 0 0 0 0
Zone 3 UOB 5 0 0 0 10 5 0 0 6 0 0 0 1 2 0 0
Zone 4 UOB 0 0 9 0 0 0 2 0 0 0 0 0 0 0 5 0
TOTAL UOB
per Zone 5 2 9 2 10 5 2 2 10 4 8 125 1 2 10 3
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:
Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ 41 $ - $ 41 $ - $ - $ - $ 41 $ 82 $ 82 $ 163 $ - $ - $ - $ 102 $ 61 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,061 $ - $ - $ - $ - Zone 3 $ 138 $ - $ - $ - $ 276 $ 138 $ - $ - $ 166 $ - $ - $ - $ 28 $ 55 $ - $ - Zone 4 $ - $ - $ 270 $ - $ - $ - $ 60 $ - $ - $ - $ - $ - $ - $ - $ 150 $ - SUBTOTAL $ 138 $ 41 $ 270 $ 41 $ 276 $ 138 $ 60 $ 41 $ 247 $ 82 $ 163 $ 1,061 $ 28 $ 55 $ 252 $ 61 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
APPLIED
UOB &
EXPENSES $ 138 $ 41 $ 270 $ 41 $ 276 $ 138 $ 60 $ 41 $ 247 $ 82 $ 163 $ 1,061 $ 28 $ 55 $ 252 $ 61 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (38) $ (2) $ (81) $ (2) $ (76) $ (38) $ (18) $ (2) $ (49) $ (4) $ (7) $ 599 $ (8) $ (15) $ (50) $ (3)
BALANCE
TO LEVY $ 138.15 $ 40.76 $ 270.27 $ 40.76 $ 276.30 $ 138.15 $ 60.06 $ 40.76 $ 247.30 $ 81.52 $ 163.04 $ 1,061.25 $ 27.63 $ 55.26 $ 252.05 $ 61.14 Total # of
Parcels 1 2 1 1 2 1 1 1 1 1 1 40 1 1 45 4
Total Parcels
Levied 1 2 1 1 2 1 1 1 1 1 1 40 1 1 45 4
Total
Assessment
Allowable $ 100.25 $ 38.90 $ 189.27 $ 38.90 $ 200.50 $ 100.25 $ 42.06 $ 38.90 $ 198.10 $ 77.80 $ 155.60 $ 1,660.00 $ 20.05 $ 40.10 $ 202.50 $ 58.36 Redlands Regular Meeting 06-21-2022 749 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S9-D Annexation S9-E Annexation S9-F Annexation S10-A Annexation S10-B Annexation S10-C Annexation S10-D Annexation S10-E Annexation S10-F Annexation S10-G Annexation S10-H Annexation S10-I Annexation S10-J Annexation S10-K Annexation S10-M Description CUP 617 CRA 670 CUP 629 Tract 15040 Tract 15832 Tract 15937 Tract 16015 Tract 16029 Tract 16032 Tract 16082 Tract 16101 MS 253, 255 (PM
15530, 15617 MS 252 (PM 15492 CRA 720 CRA 679
Original
Parcels APN 292-033-13 APN 292-157-20 APN 1212-431-02
APN 174-631-01
THRU 09, 11
THRU 35, 37
THRU 58, 63 & 64
APN 172-301-18
THRU 22, 26
APN 168-731-01
THRU 25, APN
168-741-01 THRU
78, APN 168-751-
01 THRU 56
APN 1212-021-01
THRU 62
APN 167-081-13
THRU 45
APN 170-481-20
THRU 34
APN 172-091 24
THRU 36
APN 168-771-01 THRU
50, APN 168-781-01
THRU 34, APN 168-791-
01 THRU 28, APN168-
801-01 THRU 38
APN 292-153-28,
30 THRU 43
APN 169-011-32
THRU 35, 38 & 39
APN 292-154-22
THRU 25 APN 292-310-42
Zone 3 1 3 1 & 3 1 & 4 1, 3, & 4 1 1 & 3 1 & 4 1 1 & 4 1 & 4 4 1 & 4 1 Unit of
Benefit/Zone
Zone 1 UOB 0 1 0 71 4 95 54 12 9 18 108 17 0 5 1
Zone 2 UOB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Zone 3 UOB 4 0 5 4 0 30 0 11 0 0 0 0 0 0 0
Zone 4 UOB 0 0 0 0 3 13 0 0 4 0 9 5 7 2 0
TOTAL UOB
per Zone 4 1 5 75 7 138 54 23 13 18 117 22 7 7 1
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Calculation of
Current
Assessments:
Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ 20 $ - $ 1,447 $ 82 $ 1,936 $ 1,101 $ 245 $ 183 $ 367 $ 2,201 $ 346 $ - $ 102 $ 20 Zone 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Zone 3 $ 111 $ - $ 138 $ 111 $ - $ 829 $ - $ 304 $ - $ - $ - $ - $ - $ - $ - Zone 4 $ - $ - $ - $ - $ 90 $ 390 $ - $ - $ 120 $ - $ 270 $ 150 $ 210 $ 60 $ - SUBTOTAL $ 111 $ 20 $ 138 $ 1,558 $ 172 $ 3,155 $ 1,101 $ 548 $ 304 $ 367 $ 2,471 $ 497 $ 210 $ 162 $ 20 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - TOTAL
APPLIED
UOB &
EXPENSES $ 111 $ 20 $ 138 $ 1,558 $ 172 $ 3,155 $ 1,101 $ 548 $ 304 $ 367 $ 2,471 $ 497 $ 210 $ 162 $ 20 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - General Fund
Contribution $ (30) $ (1) $ (38) $ (96) $ (31) $ (433) $ (50) $ (94) $ (44) $ (17) $ (181) $ (61) $ (63) $ (23) $ (1)
BALANCE
TO LEVY $ 110.52 $ 20.38 $ 138.15 $ 1,557.50 $ 171.61 $ 3,155.39 $ 1,100.52 $ 548.49 $ 303.54 $ 366.84 $ 2,471.31 $ 496.61 $ 210.21 $ 161.96 $ 20.38 Total # of
Parcels 1 1 1 58 6 159 62 33 15 13 150 15 6 4 1
Total Parcels
Levied 1 1 1 58 6 159 62 33 15 13 150 15 6 4 1
Total
Assessment
Allowable $ 80.20 $ 19.45 $ 100.25 $ 1,461.02 $ 140.88 $ 2,722.08 $ 1,050.28 $ 454.08 $ 259.20 $ 350.09 $ 2,290.50 $ 435.82 $ 147.20 $ 139.31 $ 19.45 Redlands Regular Meeting 06-21-2022 750 of 1716
APPENDIX A
COST TABLE
ENGINEER'S REPORT
STREET LIGHTING DISTRICT NO. 1, FY 2022-2023
District Name Annexation S10-N Annexation S10-O Annexation S10-P Annexation S10-Q Annexation S10-R Annexation S10-S Annexation S10-T Annexation S10-U Annexation S10-V Annexation S10-W TOTALS Description CUP 35R CUP 355 REV. 8 CUP 543 MS 234 (PM 15414) MS 251 (PM 15414) Tract 14790-2 Tract 14790-3 Tract 15532 CUP 652 MS 240 Original
Parcels APN 173-251-21
APN 172-121-10, 11,
14 APN 171-431-02
Subsequently, 02
was changed to 05
APN 169-272-29,
APN 169-281-45,
46 APN 176-014-16 &
17 APN 294-181-02 THRU 15,
APN 294-191-01 THRU 4, 6
THRU 12, 16 THRU 20,
APN 294-201-09, 11, 13, 15,
19, 21, 27, 28, APN 294-211-
02 THRU 04, 06 THRU 10,
12, 13
APN 294-222-01 THRU 12,
APN 294-232-01 THRU 07,
APN 294-242-01 THRU 06,
APN 294-252-01 THRU 13,
APN 294-262-01 THRU 13
APN 168-271-13
THRU 48 APN 171-011-54 APN 292-201-22
Zone 3 3 3 1 & 2 3 1 & 3 1 & 3 1, 3 & 4 1 1
Unit of
Benefit/Zone
Zone 1 UOB 0 0 0 6 0 80 70 18 1 0 749
Zone 2 UOB 0 0 0 6 0 0 0 0 0 0 131
Zone 3 UOB 3 4 6 0 3 41 24 3 0 0 291
Zone 4 UOB 0 0 0 0 0 0 0 5 0 0 158
TOTAL UOB
per Zone 3 4 6 12 3 121 94 26 1 0 1329
Actual
Expenses
Maintenance $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Incidental $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
TOTAL
EXPENSES $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Calculation of
Current
Assessments:
Unit of Benefit
Assessment/
Zone
Zone 1 $ - $ - $ - $ 122 $ - $ 1,630 $ 1,427 $ 367 $ 20 $ - $ 15,265 Zone 2 $ - $ - $ - $ 51 $ - $ - $ - $ - $ - $ - $ 1,112 Zone 3 $ 83 $ 111 $ 166 $ - $ 83 $ 1,133 $ 663 $ 83 $ - $ - $ 8,040.33 Zone 4 $ - $ - $ - $ - $ - $ - $ - $ 150 $ - $ - $ 4,745 SUBTOTAL $ 83 $ 111 $ 166 $ 173 $ 83 $ 2,763 $ 2,090 $ 600 $ 20 $ - $ 29,162 Incidental
Expenses
Engineering
and Admin. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
SUBTOTAL $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
TOTAL
APPLIED
UOB &
EXPENSES $ 83 $ 111 $ 166 $ 173 $ 83 $ 2,763 $ 2,090 $ 600 $ 20 $ - $ 29,162 Levy
Adjustments
Fund
Collection $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
General Fund
Contribution $ (23) $ (30) $ (45) $ 23 $ (23) $ (385) $ (247) $ (84) $ (1) $ - $ (3,697)
BALANCE
TO LEVY $ 82.89 $ 110.52 $ 165.78 $ 173.22 $ 82.89 $ 2,763.23 $ 2,089.72 $ 599.88 $ 20.38 $ - $ 29,161.88 Total # of
Parcels 1 3 1 3 2 48 51 36 1 1 993
Total Parcels
Levied 1 3 1 3 2 48 51 36 1 0 990
Total
Assessment
Allowable $ 60.15 $ 80.19 $ 120.30 $ 196.44 $ 60.16 $ 2,377.92 $ 1,842.63 $ 515.52 $ 19.45 $ - $ 25,465.25 Redlands Regular Meeting 06-21-2022 751 of 1716
APPENDIX B
DISTRICT DIAGRAM
Redlands Regular Meeting 06-21-2022 752 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
THIS PAGE INTENTIONALLY LET BLANK
Redlands Regular Meeting 06-21-2022 753 of 1716
CITY OF REDLANDS
STREET LIGHT DISTRICT NO. 1
APPENDIX B - ASSESSMENT DIAGRAMS
Redlands Regular Meeting 06-21-2022 754 of 1716
2 Abbreviations
APN – Assessor’s Parcel Number
CRA – Commission Review and Approval
CUP – Conditional Use Permit
MS – Minor Subdivision
PM – Parcel Map
TM – Tract Map
General comments
Each annexation has its own diagram.
North is up unless notated otherwise.
The assessor’s parcel numbers are shown as a 9 digit number.
A dark red line delineates the boundary of each annexation.
A shaded background is typically used to indicate parcels within the Street Lighting District.
Annexation #s
Initial District
S1-A thru S1-Y
S2-A thru S2-H
S3-A thru S3-I
S4-A thru S4-I
S5-A thru S5-E
S6-A thru S6-B
S7-A thru S7-H
S8-A thru S8-C
S9-A thru S9-F
S10-A thru S10-W
Redlands Regular Meeting 06-21-2022 755 of 1716
1 Initial District
Parcel Map No. 11917
Redlands Regular Meeting 06-21-2022 756 of 1716
2 Annexation S1-A
Parcel Map No. 12450
These parcels are not assessed.
Redlands Regular Meeting 06-21-2022 757 of 1716
3 Annexation S1-B
Parcel Map No. 11755
Redlands Regular Meeting 06-21-2022 758 of 1716
4 Annexation S1-C
CUP 617
Redlands Regular Meeting 06-21-2022 759 of 1716
5 Annexation S1-D
MS 184, Parcel Map No. 12300
Redlands Regular Meeting 06-21-2022 760 of 1716
6 Annexation S1-E
CUP 382
Redlands Regular Meeting 06-21-2022 761 of 1716
7 Annexation S1-F
CRA 606
Redlands Regular Meeting 06-21-2022 762 of 1716
8 Annexation S1-G
CRA 486
Note: The boundary shown in red was the original parcel for Annexation S1-G.
The lot boundary was modified so the entire parcel is shown as part of the Street Light District.
Redlands Regular Meeting 06-21-2022 763 of 1716
9 Annexation S1-H
CUP 253
Redlands Regular Meeting 06-21-2022 764 of 1716
10 Annexation S1-I
CRA 608
Redlands Regular Meeting 06-21-2022 765 of 1716
11 Annexation S1-J
CUP 519
Redlands Regular Meeting 06-21-2022 766 of 1716
12 Annexation S1-K
CUP 516
Redlands Regular Meeting 06-21-2022 767 of 1716
13 Annexation S1-L
CUP 518
Redlands Regular Meeting 06-21-2022 768 of 1716
14 Annexation S1-M
CUP 522
Redlands Regular Meeting 06-21-2022 769 of 1716
15 Annexation S1-N
Tract 13947
Redlands Regular Meeting 06-21-2022 770 of 1716
16 Annexation S1-O
CUP 521
Redlands Regular Meeting 06-21-2022 771 of 1716
17 Annexation S1-P
CUP 605
Redlands Regular Meeting 06-21-2022 772 of 1716
18 Annexation S1-Q
MS 183 - Parcel Map 12087, City Hall
Redlands Regular Meeting 06-21-2022 773 of 1716
19 Annexation S1-R
Parcel Map 11904
Redlands Regular Meeting 06-21-2022 774 of 1716
20 Annexation S1-S
CUP 278
See comments for Annexation S7-A
Redlands Regular Meeting 06-21-2022 775 of 1716
21 Annexation S1-T
CUP 405
Redlands Regular Meeting 06-21-2022 776 of 1716
22 Annexation S1-U
CRA 354, Parcel Map 3131
Redlands Regular Meeting 06-21-2022 777 of 1716
23 Annexation S1-V
CRA 346
Redlands Regular Meeting 06-21-2022 778 of 1716
24 Annexation S1-W
CRA 607
Redlands Regular Meeting 06-21-2022 779 of 1716
25 Annexation S1-X
Tract 12461
Redlands Regular Meeting 06-21-2022 780 of 1716
26 Annexation S1-Y
Parcel Map 12022
Redlands Regular Meeting 06-21-2022 781 of 1716
27 Annexation S2-A
Parcel Map 12330
Redlands Regular Meeting 06-21-2022 782 of 1716
28 Annexation S2-B
Parcel Map 12940
Redlands Regular Meeting 06-21-2022 783 of 1716
29 Annexation S2-C
This Annexation has been removed. It was a duplicate of Annexation S1-D.
Redlands Regular Meeting 06-21-2022 784 of 1716
30 Annexation S2-D
Tract Map 14556
Redlands Regular Meeting 06-21-2022 785 of 1716
31 Annexation S2-E
CRA 611
This parcel is not assessed.
Redlands Regular Meeting 06-21-2022 786 of 1716
32 Annexation S2-F
MS 196
Redlands Regular Meeting 06-21-2022 787 of 1716
33 Annexation S2-G
Parcel Map 11189
Redlands Regular Meeting 06-21-2022 788 of 1716
34 Annexation S2-H
CRA 615
Redlands Regular Meeting 06-21-2022 789 of 1716
35 Annexation S3-A
CRA 517
Redlands Regular Meeting 06-21-2022 790 of 1716
36 Annexation S3-B
CRA 628
Redlands Regular Meeting 06-21-2022 791 of 1716
37 Annexation S3-C
CRA 624
Redlands Regular Meeting 06-21-2022 792 of 1716
38 Annexation S3-D
CUP 532, CRA 305
Redlands Regular Meeting 06-21-2022 793 of 1716
39 Annexation S3-E
Tract 13575
APN 1212-201-01 thru -27
Redlands Regular Meeting 06-21-2022 794 of 1716
40 Annexation S3-F
CUP 550
Redlands Regular Meeting 06-21-2022 795 of 1716
41 Annexation S3-G
CRA 623
Redlands Regular Meeting 06-21-2022 796 of 1716
42 Annexation S3-H
CUP 542, Parcel Map 13542
Redlands Regular Meeting 06-21-2022 797 of 1716
43 Annexation S3-I
There is no Annexation S3-I
Redlands Regular Meeting 06-21-2022 798 of 1716
44 Annexation S3-J
CUP 314, CUP 324, CUP 383
Redlands Regular Meeting 06-21-2022 799 of 1716
45 Annexation S4-A
MS 213, Parcel Map 13978
Redlands Regular Meeting 06-21-2022 800 of 1716
46 Annexation S4-B
MS 211
Redlands Regular Meeting 06-21-2022 801 of 1716
47 Annexation S4-C
CUP 559
Redlands Regular Meeting 06-21-2022 802 of 1716
48 Annexation S4-D
CRA 636
Redlands Regular Meeting 06-21-2022 803 of 1716
49 Annexation S4-E
CRA 546
Redlands Regular Meeting 06-21-2022 804 of 1716
50 Annexation S4-F
CRA 641 – originally two parcels that have been combined into a single parcel.
Redlands Regular Meeting 06-21-2022 805 of 1716
51 Annexation S4-G
CRA 640
Redlands Regular Meeting 06-21-2022 806 of 1716
52 Annexation S4-H
CUP 562
Redlands Regular Meeting 06-21-2022 807 of 1716
53 Annexation S4-I
CUP 548
Redlands Regular Meeting 06-21-2022 808 of 1716
54 Annexation S5-A
CRA 637
Redlands Regular Meeting 06-21-2022 809 of 1716
55 Annexation S5-B
Tract Map 10179
APN 0167-851-39 thru -56
APN 0167-861-37 thru -54
Redlands Regular Meeting 06-21-2022 810 of 1716
56 Annexation S5-C
CUP 574
Redlands Regular Meeting 06-21-2022 811 of 1716
57 Annexation S5-D
CRA 642
Redlands Regular Meeting 06-21-2022 812 of 1716
58 Annexation S5-E
Parcel Map 14090
Redlands Regular Meeting 06-21-2022 813 of 1716
59 Annexation S6-A
CRA 648
Redlands Regular Meeting 06-21-2022 814 of 1716
60 Annexation S6-B
CUP 581
Redlands Regular Meeting 06-21-2022 815 of 1716
61 Annexation S7-A
MS 228
Annexation S7-A was originally APN 0171-161-13 and was then changed to APN 0171-161-14 and -15. Annexation S1-S was originally APN 0171-171-18, -22, and -23. Assessments for Annexation S7-A and S1-S were combined and then adjusted proportionately. New APNs for both annexations are 0171-161-17 and 0171-171-34. Assessment spread proportionately. 4/20/2020 Redlands Regular Meeting 06-21-2022 816 of 1716
62 Annexation S7-B
CRA 639
Redlands Regular Meeting 06-21-2022 817 of 1716
63 Annexation S7-C
CUP 602
Redlands Regular Meeting 06-21-2022 818 of 1716
64 Annexation S7-D
CUP 590
The east half of the property was the original Annexation S7-D when it was a separate parcel.
Redlands Regular Meeting 06-21-2022 819 of 1716
65 Annexation S7-E
CUP 607
Redlands Regular Meeting 06-21-2022 820 of 1716
66 Annexation S7-F
CUP 577
Redlands Regular Meeting 06-21-2022 821 of 1716
67 Annexation S7-G
CUP 541
Redlands Regular Meeting 06-21-2022 822 of 1716
68 Annexation S7-H
Tract 14790-1
APN 0176-521-01 thru -13, -18 thru -23, -27 thru -32
APN 0176-531-01 thru -03, -07 thru -09, -12, -13, -18, -20 thru -22, -24 thru -26 Redlands Regular Meeting 06-21-2022 823 of 1716
69 Annexation S8-A
CUP 584
Redlands Regular Meeting 06-21-2022 824 of 1716
70 Annexation S8-B
CRA 666
Redlands Regular Meeting 06-21-2022 825 of 1716
71 Annexation S8-C, CUP 616
The portion of this parcel that was Annexation S-8C is no longer assessed.
Redlands Regular Meeting 06-21-2022 826 of 1716
72 Annexation S9-A
Tract 15589
Assessor’s Parcel Numbers
0293-421-01 thru -45
Redlands Regular Meeting 06-21-2022 827 of 1716
73 Annexation S9-B
MS 221, Parcel Map 14285
Redlands Regular Meeting 06-21-2022 828 of 1716
74 Annexation S9-C
There is no Annexation S9-C.
Redlands Regular Meeting 06-21-2022 829 of 1716
75 Annexation S9-D
CUP 617
Redlands Regular Meeting 06-21-2022 830 of 1716
76 Annexation S9-E
CRA 670
Redlands Regular Meeting 06-21-2022 831 of 1716
77 Annexation S9-F
CUP 629
Boundary of area of original annexation is shown. That parcel has since been incorporated into the larger parcel.
Redlands Regular Meeting 06-21-2022 832 of 1716
78 Annexation S10-A
Tract 15040
APN 174-631-01 thru -09, -11 thru -35
APN 174-631-37 thru -58
APN 0174-631-63, -64
Redlands Regular Meeting 06-21-2022 833 of 1716
79 Annexation S10-B
Tract 15832
Redlands Regular Meeting 06-21-2022 834 of 1716
80 Annexation S10-C
Tract 15937
APN 0168-731-01 thru -25
APN 0168-741-01 thru -78
APN 0168-751-01 thru -56
Redlands Regular Meeting 06-21-2022 835 of 1716
81 Annexation S10-D
Tract 16015
APN 168-761-01 thru 168-761-62
Redlands Regular Meeting 06-21-2022 836 of 1716
82 Annexation S10-E
Tract 16029
APN 167-081-13 thru 167-081-45
Redlands Regular Meeting 06-21-2022 837 of 1716
83 Annexation S10-F
Tract 16032
Redlands Regular Meeting 06-21-2022 838 of 1716
84 Annexation S10-G
Tract 16082
Redlands Regular Meeting 06-21-2022 839 of 1716
85 Annexation S10-H
Tract 16101
APN 168-771-01 thru -50
APN 168-761-01 thru -34
APN 168-791-01 thru -28
APN 168-801-01 thru -38
Redlands Regular Meeting 06-21-2022 840 of 1716
86 Annexation S10-I
Parcel Map 15530 and Parcel Map 15617
Redlands Regular Meeting 06-21-2022 841 of 1716
87 Annexation S10-J
Parcel Map 15492
Redlands Regular Meeting 06-21-2022 842 of 1716
88 Annexation S10-K
CRA 720
Redlands Regular Meeting 06-21-2022 843 of 1716
89 Annexation S10-L
There is no Annexation S10-L
Redlands Regular Meeting 06-21-2022 844 of 1716
90 Annexation S10-M
CRA 679
Redlands Regular Meeting 06-21-2022 845 of 1716
91 Annexation S10-N
CUP 35, Rev. 2
Redlands Regular Meeting 06-21-2022 846 of 1716
92 Annexation S10-O
CUP 355, Rev 8
Redlands Regular Meeting 06-21-2022 847 of 1716
93 Annexation S10-P
CUP 543
Redlands Regular Meeting 06-21-2022 848 of 1716
94 Annexation S10-Q
MS 234, Parcel Map 14891
Redlands Regular Meeting 06-21-2022 849 of 1716
95 Annexation S10-R
MS 251, Parcel Map 15414
Redlands Regular Meeting 06-21-2022 850 of 1716
96 Annexation S10-S
Tract 14790-2
APN 0294-181-02 thru -15
APN 0294-191-01 thru -04, -06 thru -12, -16 thru -20
APN 0294-201-09, -11, -13, -15, -19, -21, -27, -28
APN 0294-211-02 thru -04, -06 thru -10, -12, -13
Redlands Regular Meeting 06-21-2022 851 of 1716
97 Annexation S10-T
Tract 14790-3
APN 0294-222-01 thru -12
APN 0294-232-01 thru -07
APN 0294-242-01 thru -06
APN 0294-252-01 thru -13
APN 0294-262-01 thru -13
Redlands Regular Meeting 06-21-2022 852 of 1716
98 Annexation S10-U
Tract 15532
Redlands Regular Meeting 06-21-2022 853 of 1716
99 Annexation S10-V
CUP 652
APN 0171-011-54 was the original Annexation 10-V. That parcel was merged with the parcel immediately to the east (APN 0171-011-45). The new parcel was assigned APN 0171-011-67.
Redlands Regular Meeting 06-21-2022 854 of 1716
100
Annexation S10-W
MS 240
Original APN 0292-201-22 has been subdivided into a condo complex.
There is no assessment for Annexation S10-W
Redlands Regular Meeting 06-21-2022 855 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
APPENDIX C
RESOLUTIONS
Redlands Regular Meeting 06-21-2022 856 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 857 of 1716
CITY OF REDLANDS
STREET LIGHT DISTRICT NO. 1
APPENDIX C – RESOLUTIONS
Resolution No 8294 – Institute proceedings and appointment of engineer Resolution No 8295 – Preliminary approval of engineer’s report Resolution No 8296 – Declaring intention to levy assessments Resolution No 8298 – Confirming a diagram and assessments Redlands Regular Meeting 06-21-2022 858 of 1716
This page intentionally left blank
Redlands Regular Meeting 06-21-2022 859 of 1716
RESOLUTION NO. 8294
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
INSTITUTING PROCEEDINGS FOR THE CONTINUED LEVY OF
ASSESSMENTS, APPOINTING AN ASSESSMENT ENGINEER, AND
ORDERING THE PREPARATION OF AN ENGINEER'S REPORT IN THE MATTER OF STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE
MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (this “City Council”) has determined that the public interest, convenience and necessity requires the installation, operation and maintenance of a street lighting system and other facilities as set forth in Section 22525 of the California Streets and Highways Code; and
WHEREAS, it has been determined by the City Council of the City of Redlands (this “City Council”), that the public interest, convenience and necessity requires the maintenance of landscaping as set forth in Section 22525 of the California Streets and Highways Code; and WHEREAS, this City Council has formed Redlands’ Street Lighting District No. 1 to pay the costs associated with the installation, operation and maintenance of such street lighting system and other facilities; and
WHEREAS, this City Council has formed Redlands’ Landscape Maintenance District No. 1 to pay the costs for the maintenance such landscaping; and
WHEREAS, it is the desire of this City Council to initiate proceedings and order the preparation of an engineer’s report to levy assessments for fiscal year 2022-2023 upon properties located within Street Lighting District No. 1 and Landscape Maintenance District No. 1; and WHEREAS, this City Council further desires to appoint Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, as the "Assessment Engineer" for Street Lighting District No. 1 and Landscape Maintenance District No. 1;
NOW, THEREFORE, the City Council of the City of Redlands does hereby find, determine and resolve as follows:
Section 1. That the public interest, convenience and necessity requires the continued levy of assessments within Street Lighting District No. 1 for the purpose of installing, operating and maintaining street lights and associated facilities as authorized by Section 22620 of the California Streets and Highways Code and in compliance with Article XIIID, and Section 19 of Article XVI, of the California Constitution.
Section 2. That the public interest, convenience and necessity requires the continued levy of assessments within Landscape Maintenance District No. 1 for the purpose of maintaining landscaping and improvements as authorized by Section 22620 of the California Streets and Redlands Regular Meeting 06-21-2022 860 of 1716
Highways Code and in compliance with the requirements of Article XIIID and Section 19 of Article XVI of the California Constitution.
Section 3. That the properties to be assessed for the installation, operation and maintenance of the street lighting facilities shall be those properties located within the boundaries of Street Lighting District No. 1.
Section 4. That the properties to be assessed for the maintenance and operation of the landscaping and improvements shall be those properties located within the boundaries of Landscape Maintenance District No. 1.
Section 5. That the proceedings for the continued levy of assessments within Street Lighting District No. 1 and Landscape Maintenance District No. 1 shall be conducted in accordance the with provisions of Division 15 of the California Streets and Highways Code (the Landscaping and Lighting Act of 1972) and in compliance with the requirements of Article XIIID, and Section 19 of Article XVI, of the California Constitution.
Section 6. That Redlands’ Engineering Manager, Goutam Dobey, RCE No. 75646, having an office located at 35 Cajon Street, Suite 15A, Redlands, California, is hereby appointed “Assessment Engineer” and shall have the authority conferred upon the Assessment Engineer by the Landscaping and Lighting Act of 1972.
Section 7. That the Assessment Engineer is hereby ordered to prepare a report in accordance with the Landscaping and Lighting Act of 1972.
ADOPTED, SIGNED AND APPROVED this 3rd day of May, 2022. ______________________________
Paul T. Barich, Mayor
ATTEST:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 861 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, do hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof, held on the 3rd day of May, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 862 of 1716
This page intentionally left blank.
Redlands Regular Meeting 06-21-2022 863 of 1716
RESOLUTION NO. 8295
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS GIVING PRELIMINARY APPROVAL OF THE ENGINEER'S REPORTS FOR FISCAL YEAR 2022- 2023 FOR STREET LIGHTING DISTRICT NO. 1 AND LANDSCAPE MAINTENANCE DISTRICT NO. 1
WHEREAS, the City Council of the City of Redlands (the “City Council”) has heretofore determined that the public interest, convenience and necessity require the maintenance and operation of street lighting and appurtenant facilities, as set forth in Section 22525 of the Streets and Highways Code, within the incorporated boundaries of the City of Redlands; and WHEREAS, the City Council has heretofore determined that the public interest, convenience and necessity require the maintenance of landscape and irrigation facilities set forth in Section 22525 of the Streets and Highways Code, State of California, within the incorporated boundaries of the City of Redlands; and
WHEREAS, Goutam Dobey, City of Redlands’ Engineering Manager, 35 Cajon Street, Suite 15A, Redlands, California, has been appointed “Assessment Engineer” with all provisions of Part 2 of Division 15 of the Streets and Highways Code applicable to the Engineer being applied to the “Assessment Engineer;” and
WHEREAS, Sections 22622 and 22623 of the Streets and Highways Code require that an Engineer's Report be prepared and filed annually, specifying the assessments to be levied against the benefitting properties within the City’s Street Lighting District No. 1 and Landscape Maintenance District No. 1; and
WHEREAS, the City of Redlands Engineering Manager, as the Assessment Engineer, has prepared and filed with the City Clerk reports in writing as required by the Landscaping and Lighting Act of 1972 and in compliance with Article XIIID of the California Constitution; and WHEREAS, the City Council has duly considered said reports and each and every part thereof; and finds that each and every part of said reports is sufficient, and that no part of said reports requires modification in any respect;
NOW, THEREFORE, be it resolved by the City Council of the City of Redlands as follows:
Section 1. That the Engineer's estimate of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said reports be, and each of them are hereby, preliminarily approved and confirmed.
Section 2. That the diagram showing the Street Lighting District No. 1 and Landscape Maintenance District No. 1 referred to and described in said reports, and the boundaries of the lots and parcels of land within such assessment district as the same existed at the time of passage of this resolution, are hereby preliminarily approved and confirmed.
Redlands Regular Meeting 06-21-2022 864 of 1716
Section 3. That the proposed assessment upon the properties in Street Lighting District No. 1 and Landscape Maintenance District No. 1, in proportion to the estimated benefit to be received by such properties, respectively, from said work and of the incidental expenses thereof, as contained in said report is hereby preliminarily approved and confirmed.
Section 4. That said reports shall stand as the Engineer's Report for the purposes of all subsequent proceedings for Street Lighting District No. 1 and Landscape Maintenance District No.
1. APPROVED AND ADOPTED this 7th day of June, 2022.
________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 865 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting thereof held on the 7th day of June, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 866 of 1716
This page intentionally left blank.
Redlands Regular Meeting 06-21-2022 867 of 1716
RESOLUTION NO. 8296
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
DECLARING ITS INTENTION TO LEVY AND COLLECT ASSESSMENTS WITHIN REDLANDS’ STREET LIGHTING ASSESSMENT DISTRICT NO. 1 AND LANDSCAPE ASSESSMENT DISTRICT NO. 1 FOR FISCAL YEAR 2021-2022 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, AND ESTABLISHING A TIME AND PLACE FOR PUBLIC HEARINGS
FOR THE TWO DISTRICTS TO CONSIDER PROTESTS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:
Section 1. The City Council of the City of Redlands hereby (1) finds that the public interest and convenience requires, and (2) declares its intention to levy and collect, assessments against the lots and parcels of property within an existing assessment districts designated “Redlands’ Street Lighting Assessment District No. 1 and Landscape Assessment District No. 1” (the “Districts”) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code (commencing with Section 22500) (the “Act”) for fiscal year 2022- 2023, commencing July 1, 2022, and ending June 30, 2023, to pay for the costs and expenses of the improvements described in Section 3 hereof.
Section 2. Reference is hereby made to a map on file in the office of the City Clerk and open for public inspection for a description of the exterior boundaries of the Districts.
Section 3. The proposed improvements are briefly described as follows: The operation, maintenance and servicing of public within the District, including the operation, maintenance and servicing of public lighting facilities and landscaping, including safety lighting, traffic signals, trees, shrubs, grass and other ornamental vegetation, and appurtenant facilities, located along public roadways, streets and rights-of-way within the boundaries of the Districts. “Maintenance” means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of the public lighting and landscaping facilities, and appurtenant facilities, including repair, removal or replacement of all or part of any of the public lighting and landscaping facilities, or appurtenant facilities. “Servicing” means the maintenance of any of the public lighting and landscaping facilities or appurtenant facilities, including the furnishing of electric current, energy or gas for the operation of any of the lighting facilities and the furnishing of water for the irrigation of any of the landscaping facilities.
Section 4. The assessments to be levied and collected against the assessable lots and parcels of property within the Districts for fiscal year 2022-2023 are not proposed to increase from the assessments levied and collected for fiscal year 1997-1998.
Section 5. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the Districts shall not be subject to assessment to be made under these proceedings to cover any of the costs and expenses of the improvements.
Redlands Regular Meeting 06-21-2022 868 of 1716
Section 6. All railroad, gas, water and electric utility rights-of-way are included within the Districts and shall be assessed in accordance with the benefits received from the improvements.
Section 7. Reference is hereby made to the Reports of the Engineer entitled “City of Redlands Street Lighting District No. 1 Engineer’s Report for Fiscal Year 2022-2023” and “City of Redlands Landscape Maintenance District No. 1 Engineer’s Report for Fiscal Year 2022-2023” on file in the office of the City Clerk for a full and detailed description of the improvements, the boundaries of the District and any zones therein and the proposed assessments upon assessable lots and parcels of land within the District.
Section 8. NOTICE IS HEREBY GIVEN THAT THE CITY COUNCIL APPOINTS TUESDAY, THE 21ST DAY OF JUNE, 2022, AT THE HOUR OF 6:00 P.M., OR AS SOON
THEREAFTER AS THE MATTER MAY BE HEARD, IN THE COUNCIL CHAMBERS AT CITY HALL, CITY OF REDLANDS, 35 CAJON STREET, SUITE 2, REDLANDS, CALIFORNIA 92373, AS THE TIME AND PLACE FOR TWO PUBLIC HEARINGS TO
CONSIDER PROTESTS OR OBJECTIONS TO THE LEVY OF THE PROPOSED ASSESSMENTS IN CONNECTION WITH THE DISTRICTS. All interested persons shall be afforded the opportunity to hear and be heard. Any interested person may file a written protest with the City Clerk prior to the conclusion of the hearing. A written protest shall state all grounds of objection. A protest by a property owner shall contain a description sufficient to identify the property owned by the signer thereof. The City Council shall consider all oral statements and all written protests made or filed by any interested person.
Section 9. The City Clerk is hereby authorized and directed to give notice of such hearing in accordance with law.
Section 10. The City Council hereby determines and declares that the proposed assessments constitute a continuation of assessments existing on the effective date of Article XIIID, that the assessments are imposed exclusively to finance the maintenance and operation expenses for streets and that the assessments are exempt from the requirements of Article XIIID, Section 4 of the California Constitution.
Section 11. The City Council hereby designates Goutam Dobey, Engineering Manager, telephone number (909) 798-7584 x2, to answer inquiries regarding the hearing, protest proceedings and procedural or technical matters.
ADOPTED, SIGNED AND APPROVED this 7th day of June, 2022.
Redlands Regular Meeting 06-21-2022 869 of 1716
______________________________
Paul T. Barich, Mayor
ATTEST:
__________________________
Jeanne Donaldson, City Clerk
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was duly adopted by the City Council, at a regular meeting thereof, held on the 7th day of June, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 870 of 1716
This page intentionally left blank.
Redlands Regular Meeting 06-21-2022 871 of 1716
RESOLUTION NO. 8298
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 2022-2023 FISCAL
YEAR IN CONNECTION WITH STREET LIGHTING MAINTENANCE DISTRCT NO. 1 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS AND HIGHWAYS CODE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS:
Section 1. Pursuant to its adoption of a prior resolution, the City Council of the City of Redlands initiated proceedings and declared its intention to levy an assessment against the assessable lots and parcels of property within an existing assessment district designated “Street Lighting Maintenance District No. 1” (the “District”) pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500) (the “Act”) for the fiscal year commencing July 1, 2022, and ending June 30, 2023, and ordered the Engineering Manager, Goutam Dobey, to prepare and file a written report in accordance with Article 4 of Chapter 1 of the Act. This City Council, also by adoption of a prior resolution, approved such Engineer’s Report.
Section 2. Following notice duly given in accordance with law, the City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessment within the District for fiscal year 2022-2023 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear, and be heard regarding, protests and objections to the levy and collection of the proposed assessment against lots or parcels of property within the District. The City Council considered all oral and written statements, protests and communications made or filed by interested persons.
Section 3. Based upon its review of the Engineer’s Report and other reports and information, this City Council hereby finds and determines that (i) land within the District will be benefited by the improvements described in the Engineers Report (ii) the District includes all of the lands so benefited, and (iii) the net amount to be assessed upon the lands within the District for the 2022-2023 fiscal year in accordance with the Engineer’s Report is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.
Section 4. The City Council declares that the diagram and assessment in the Engineer’s Report are hereby confirmed as filed.
Section 5. The City Council hereby orders the improvements described in the Engineer’s Report to be made.
Redlands Regular Meeting 06-21-2022 872 of 1716
Section 6. The assessment is in compliance with the provisions of the Act and the City Council has complied with all law pertaining to the levy of an annual assessment pursuant to the Act.
Section 7. The assessments to be levied and collected against the assessable lots and parcels of property within the District for fiscal year 2022-2023 are not proposed to increase from the assessment levied and collected for fiscal year 1997-1998.
Section 8. The assessment is levied without regard to property valuation.
Section 9. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.
Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for fiscal year 2022-2023.
Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.
Section 12. The County Auditor of San Bernardino County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.
Section 13. The City Treasurer shall deposit all monies representing assessments collected by the County to the credit of a special fund for Street Lighting Maintenance District No.
1. Section 14. The adoption of this Resolution constitutes the levy of an assessment against the lots and parcels of land in the District for the fiscal year commencing July 1, 2022, and ending June 30, 2023.
Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption.
Section 16. A certified copy of the assessment and diagram shall be filed in the City’s Municipal Utilities and Engineering Department, with a duplicate copy on file in the office of the City Clerk and open for public inspection.
Redlands Regular Meeting 06-21-2022 873 of 1716
ADOPTED, SIGNED AND APPROVED this 21st day of June, 2022.
________________________________
Paul T. Barich, Mayor
ATTEST:
_______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 874 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certifies that the foregoing resolution was adopted by the City Council, at a regular meeting thereof, held on the 21st day of June, 2022 by the following vote:
AYES:
NOES:
ABSENT
ABSTAIN:
____________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 875 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
APPENDIX D
ASSESSMENT ROLL
Redlands Regular Meeting 06-21-2022 876 of 1716
City of Redlands
Street Lighting District No. 1
Engineer’s Report
Fiscal Year 2022-2023
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting 06-21-2022 877 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
0167-081-13-0000 Annexation S10-E Zone 1 & 3 $13.76
0167-081-14-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-15-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-16-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-17-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-18-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-19-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-20-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-21-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-22-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-23-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-24-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-25-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-26-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-27-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-28-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-29-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-30-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-31-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-32-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-33-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-34-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-35-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-36-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-37-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-38-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-39-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-40-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-41-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-42-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-43-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-44-0000 Annexation S10-E Zone 1 & 3 13.76
0167-081-45-0000 Annexation S10-E Zone 1 & 3 13.76
0167-101-13-0000 Annexation S7-E Zone 1 & 3 198.10
0167-231-19-0000 Annexation S1-D Zone 3 20.05
0167-231-20-0000 Annexation S1-D Zone 3 20.05
0167-231-21-0000 Annexation S1-D Zone 3 20.05
0167-271-61-0000 Annexation S3-D Zone 3 100.25
0167-851-39-0000 Annexation S5-B Zone 1 14.05
0167-851-40-0000 Annexation S5-B Zone 1 14.05
0167-851-41-0000 Annexation S5-B Zone 1 14.05
0167-851-42-0000 Annexation S5-B Zone 1 14.05
0167-851-43-0000 Annexation S5-B Zone 1 14.05
0167-851-44-0000 Annexation S5-B Zone 1 14.05
0167-851-45-0000 Annexation S5-B Zone 1 14.05
0167-851-46-0000 Annexation S5-B Zone 1 14.05
0167-851-47-0000 Annexation S5-B Zone 1 14.05
0167-851-48-0000 Annexation S5-B Zone 1 14.05
0167-851-49-0000 Annexation S5-B Zone 1 14.05
0167-851-50-0000 Annexation S5-B Zone 1 14.05
0167-851-51-0000 Annexation S5-B Zone 1 14.05
0167-851-52-0000 Annexation S5-B Zone 1 14.05
0167-851-53-0000 Annexation S5-B Zone 1 14.05
0167-851-54-0000 Annexation S5-B Zone 1 14.05
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
Redlands Regular Meeting 06-21-2022 878 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0167-851-55-0000 Annexation S5-B Zone 1 14.05
0167-851-56-0000 Annexation S5-B Zone 1 14.05
0167-861-37-0000 Annexation S5-B Zone 1 14.05
0167-861-38-0000 Annexation S5-B Zone 1 14.05
0167-861-39-0000 Annexation S5-B Zone 1 14.05
0167-861-40-0000 Annexation S5-B Zone 1 14.05
0167-861-41-0000 Annexation S5-B Zone 1 14.05
0167-861-42-0000 Annexation S5-B Zone 1 14.05
0167-861-43-0000 Annexation S5-B Zone 1 14.05
0167-861-44-0000 Annexation S5-B Zone 1 14.05
0167-861-45-0000 Annexation S5-B Zone 1 14.05
0167-861-46-0000 Annexation S5-B Zone 1 14.05
0167-861-47-0000 Annexation S5-B Zone 1 14.05
0167-861-48-0000 Annexation S5-B Zone 1 14.05
0167-861-49-0000 Annexation S5-B Zone 1 14.05
0167-861-50-0000 Annexation S5-B Zone 1 14.05
0167-861-51-0000 Annexation S5-B Zone 1 14.05
0167-861-52-0000 Annexation S5-B Zone 1 14.05
0167-861-53-0000 Annexation S5-B Zone 1 14.05
0167-861-54-0000 Annexation S5-B Zone 1 14.05
0168-271-13-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-14-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-15-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-16-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-17-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-18-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-19-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-20-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-21-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-22-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-23-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-24-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-25-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-26-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-27-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-28-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-29-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-30-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-31-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-32-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-33-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-34-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-35-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-36-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-37-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-38-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-39-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-40-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-41-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-42-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-43-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-44-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-45-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-46-0000 Annexation S10-U Zone 1, 3 & 4 14.32
Redlands Regular Meeting 06-21-2022 879 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-271-47-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-271-48-0000 Annexation S10-U Zone 1, 3 & 4 14.32
0168-731-01-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-02-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-03-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-04-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-05-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-06-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-07-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-08-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-09-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-10-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-11-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-12-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-13-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-14-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-15-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-16-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-17-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-18-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-19-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-20-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-21-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-22-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-23-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-24-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-731-25-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-01-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-02-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-03-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-04-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-05-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-06-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-07-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-08-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-09-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-10-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-11-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-12-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-13-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-14-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-15-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-16-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-17-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-18-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-19-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-20-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-21-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-22-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-23-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-24-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-25-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-26-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-27-0000 Annexation S10-C Zone 1, 3 & 4 17.12
Redlands Regular Meeting 06-21-2022 880 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-741-28-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-29-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-30-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-31-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-32-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-33-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-34-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-35-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-36-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-37-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-38-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-39-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-40-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-41-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-42-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-43-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-44-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-45-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-46-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-47-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-48-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-49-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-50-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-51-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-52-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-53-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-54-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-55-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-56-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-57-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-58-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-59-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-60-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-61-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-62-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-63-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-64-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-65-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-66-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-67-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-68-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-69-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-70-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-71-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-72-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-73-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-74-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-75-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-76-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-77-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-741-78-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-01-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-02-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-03-0000 Annexation S10-C Zone 1, 3 & 4 17.12
Redlands Regular Meeting 06-21-2022 881 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-751-04-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-05-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-06-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-07-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-08-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-09-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-10-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-11-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-12-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-13-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-14-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-15-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-16-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-17-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-18-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-19-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-20-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-21-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-22-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-23-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-24-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-25-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-26-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-27-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-28-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-29-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-30-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-31-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-32-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-33-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-34-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-35-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-36-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-37-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-38-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-39-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-40-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-41-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-42-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-43-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-44-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-45-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-46-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-47-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-48-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-49-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-50-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-51-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-52-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-53-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-54-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-55-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-751-56-0000 Annexation S10-C Zone 1, 3 & 4 17.12
0168-771-01-0000 Annexation S10-H Zone 1 & 4 15.27
Redlands Regular Meeting 06-21-2022 882 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-771-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-05-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-25-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-29-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-30-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-31-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-32-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-33-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-34-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-35-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-36-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-37-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-38-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-39-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-40-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-41-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-42-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-43-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-44-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-45-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-46-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-47-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-48-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-49-0000 Annexation S10-H Zone 1 & 4 15.27
0168-771-50-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-01-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-05-0000 Annexation S10-H Zone 1 & 4 15.27
Redlands Regular Meeting 06-21-2022 883 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-781-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-25-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-29-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-30-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-31-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-32-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-33-0000 Annexation S10-H Zone 1 & 4 15.27
0168-781-34-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-01-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-05-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-25-0000 Annexation S10-H Zone 1 & 4 15.27
Redlands Regular Meeting 06-21-2022 884 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0168-791-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-791-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-01-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-02-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-03-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-04-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-05-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-06-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-07-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-08-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-09-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-10-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-11-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-12-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-13-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-14-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-15-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-16-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-17-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-18-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-19-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-20-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-21-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-22-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-23-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-24-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-25-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-26-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-27-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-28-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-29-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-30-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-31-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-32-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-33-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-34-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-35-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-36-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-37-0000 Annexation S10-H Zone 1 & 4 15.27
0168-801-38-0000 Annexation S10-H Zone 1 & 4 15.27
0169-011-32-0000 Annexation S10-J Zone 4 29.44
0169-011-33-0000 Annexation S10-J Zone 4 29.44
0169-011-34-0000 Annexation S10-J Zone 4 29.44
0169-011-35-0000 Annexation S10-J Zone 4 29.44
0169-011-38-0000 Annexation S10-J Zone 4 14.72
0169-011-39-0000 Annexation S10-J Zone 4 14.72
0169-043-14-0000 Annexation S4-D Zone 1 58.35
0169-053-12-0000 Annexation S1-L Zone 3 20.05
0169-131-33-0000 Annexation S1-F Zone 1 19.45
0169-142-11-0000 Annexation S1-I Zone 3 20.05
0169-182-02-0000 Annexation S1-P Zone 1 12.97
0169-182-03-0000 Annexation S1-P Zone 1 12.97
0169-182-04-0000 Annexation S1-P Zone 1 12.97
Redlands Regular Meeting 06-21-2022 885 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0169-212-17-0000 Annexation S1-Y Zone 3 60.15
0169-212-18-0000 Annexation S1-Y Zone 3 20.05
0169-212-19-0000 Annexation S1-Y Zone 3 20.05
0169-212-20-0000 Annexation S1-Y Zone 3 40.10
0169-212-21-0000 Annexation S1-Y Zone 3 80.20
0169-212-22-0000 Annexation S1-Y Zone 3 60.15
0169-212-23-0000 Annexation S1-Y Zone 3 20.05
0169-212-24-0000 Annexation S1-Y Zone 3 20.05
0169-212-25-0000 Annexation S1-Y Zone 3 20.05
0169-212-26-0000 Annexation S1-Y Zone 3 20.05
0169-212-27-0000 Annexation S1-Y Zone 3 20.05
0169-272-29-0000 Annexation S10-Q Zone 1 65.48
0169-281-39-0000 Annexation S3-C Zone 3 20.05
0169-281-45-0000 Annexation S10-Q Zone 2 98.22
0169-281-46-0000 Annexation S10-Q Zone 1 32.74
0169-301-08-0000 Annexation S4-G Zone 4 7.01
0169-301-10-0000 Annexation S4-G Zone 4 7.01
0169-301-11-0000 Annexation S4-G Zone 4 7.01
0169-313-16-0000 Annexation S4-I Zone 1 77.80
0169-321-01-0000 Annexation S3-A Zone 3 40.10
0169-321-02-0000 Annexation S3-A Zone 3 40.10
0169-343-07-0000 Annexation S1-T Zone 3 20.05
0169-411-07-0000 Annexation S1-H Zone 4 105.15
0170-481-20-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-21-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-22-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-23-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-24-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-25-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-26-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-27-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-28-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-29-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-30-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-31-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-32-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-33-0000 Annexation S10-F Zone 1 & 4 17.28
0170-481-34-0000 Annexation S10-F Zone 1 & 4 17.28
0171-011-67-0000 Annexation S10-V Zone 1 19.45
0171-161-17-0000 Annexation S7-A Zone 3 181.54
0171-171-34-0000 Annexation S1-S Zone 3 99.15
0171-202-30-0000 Annexation S4-C Zone 3 40.10
0171-202-33-0000 Annexation S5-C Zone 1 19.45
0171-203-13-0000 Annexation S6-B Zone 1 38.90
0171-331-04-0000 Annexation S1-J Zone 3 20.05
0171-332-30-0000 Annexation S7-D Zone 1 38.90
0171-341-33-0000 Annexation S3-J Zone 3 80.20
0171-383-19-0000 Annexation S1-E Zone 3 20.05
0171-383-20-0000 Annexation S1-E Zone 3 20.05
0171-431-05-0000 Annexation S10-P Zone 3 120.30
0172-031-49-0000 Annexation S1-M Zone 3 20.05
0172-091-24-0000 Annexation S10-G Zone 1 26.93
0172-091-25-0000 Annexation S10-G Zone 1 26.93
0172-091-26-0000 Annexation S10-G Zone 1 26.93
Redlands Regular Meeting 06-21-2022 886 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0172-091-27-0000 Annexation S10-G Zone 1 26.93
0172-091-28-0000 Annexation S10-G Zone 1 26.93
0172-091-29-0000 Annexation S10-G Zone 1 26.93
0172-091-30-0000 Annexation S10-G Zone 1 26.93
0172-091-31-0000 Annexation S10-G Zone 1 26.93
0172-091-32-0000 Annexation S10-G Zone 1 26.93
0172-091-33-0000 Annexation S10-G Zone 1 26.93
0172-091-34-0000 Annexation S10-G Zone 1 26.93
0172-091-35-0000 Annexation S10-G Zone 1 26.93
0172-091-36-0000 Annexation S10-G Zone 1 26.93
0172-121-03-0000 Annexation S8-A Zone 3 20.05
0172-121-10-0000 Annexation S10-O Zone 3 26.73
0172-121-11-0000 Annexation S10-O Zone 3 26.73
0172-121-14-0000 Annexation S10-O Zone 3 26.73
0172-301-14-0000 Annexation S4-A Zone 4 25.24
0172-301-15-0000 Annexation S4-A Zone 4 12.62
0172-301-16-0000 Annexation S4-A Zone 4 12.62
0172-301-17-0000 Annexation S4-A Zone 4 12.62
0172-301-18-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-19-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-20-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-21-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-22-0000 Annexation S10-B Zone 1 & 4 23.48
0172-301-26-0000 Annexation S10-B Zone 1 & 4 23.48
0173-251-21-0000 Annexation S10-N Zone 3 60.15
0174-021-41-0000 Annexation S5-E Zone 1 19.45
0174-021-42-0000 Annexation S5-E Zone 1 19.45
0174-261-15-0000 Annexation S7-G Zone 1 155.60
0174-281-33-0000 Annexation S9-B Zone 1 14.59
0174-281-34-0000 Annexation S9-B Zone 1 14.59
0174-281-35-0000 Annexation S9-B Zone 1 14.59
0174-281-37-0000 Annexation S9-B Zone 1 14.59
0174-621-01-0000 Annexation S1-N Zone 1 19.45
0174-621-02-0000 Annexation S1-N Zone 1 19.45
0174-621-03-0000 Annexation S1-N Zone 1 19.45
0174-621-04-0000 Annexation S1-N Zone 1 19.45
0174-621-05-0000 Annexation S1-N Zone 1 19.45
0174-621-06-0000 Annexation S1-N Zone 1 19.45
0174-621-07-0000 Annexation S1-N Zone 1 19.45
0174-621-08-0000 Annexation S1-N Zone 1 19.45
0174-621-09-0000 Annexation S1-N Zone 1 19.45
0174-621-10-0000 Annexation S1-N Zone 1 19.45
0174-621-11-0000 Annexation S1-N Zone 1 19.45
0174-621-12-0000 Annexation S1-N Zone 1 19.45
0174-621-13-0000 Annexation S1-N Zone 1 19.45
0174-621-14-0000 Annexation S1-N Zone 1 19.45
0174-621-15-0000 Annexation S1-N Zone 1 19.45
0174-621-16-0000 Annexation S1-N Zone 1 19.45
0174-621-17-0000 Annexation S1-N Zone 1 19.45
0174-621-18-0000 Annexation S1-N Zone 1 19.45
0174-621-19-0000 Annexation S1-N Zone 1 19.45
0174-621-20-0000 Annexation S1-N Zone 1 19.45
0174-621-21-0000 Annexation S1-N Zone 1 19.45
0174-621-22-0000 Annexation S1-N Zone 1 19.45
Redlands Regular Meeting 06-21-2022 887 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0174-621-23-0000 Annexation S1-N Zone 1 19.45
0174-621-24-0000 Annexation S1-N Zone 1 19.45
0174-621-25-0000 Annexation S1-N Zone 1 19.45
0174-621-26-0000 Annexation S1-N Zone 1 19.45
0174-621-27-0000 Annexation S1-N Zone 1 19.45
0174-621-28-0000 Annexation S1-N Zone 1 19.45
0174-621-29-0000 Annexation S1-N Zone 1 19.45
0174-621-30-0000 Annexation S1-N Zone 1 19.45
0174-621-31-0000 Annexation S1-N Zone 1 19.45
0174-621-32-0000 Annexation S1-N Zone 1 19.45
0174-621-33-0000 Annexation S1-N Zone 1 19.45
0174-621-34-0000 Annexation S1-N Zone 1 19.45
0174-621-35-0000 Annexation S1-N Zone 1 19.45
0174-631-01-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-02-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-03-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-04-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-05-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-06-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-07-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-08-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-09-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-11-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-12-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-13-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-14-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-15-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-16-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-17-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-18-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-19-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-20-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-21-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-22-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-23-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-24-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-25-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-26-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-27-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-28-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-29-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-30-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-31-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-32-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-33-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-34-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-35-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-37-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-38-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-39-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-40-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-41-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-42-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-43-0000 Annexation S10-A Zone 1 & 3 25.19
Redlands Regular Meeting 06-21-2022 888 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0174-631-44-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-45-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-46-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-47-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-48-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-49-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-50-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-51-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-52-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-53-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-54-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-55-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-56-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-57-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-58-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-63-0000 Annexation S10-A Zone 1 & 3 25.19
0174-631-64-0000 Annexation S10-A Zone 1 & 3 25.19
0176-014-16-0000 Annexation S10-R Zone 3 30.08
0176-014-17-0000 Annexation S10-R Zone 3 30.08
0176-441-18-0000 Annexation S2-D Zone 1 33.07
0176-441-19-0000 Annexation S2-D Zone 1 33.07
0176-441-20-0000 Annexation S2-D Zone 1 33.07
0176-441-21-0000 Annexation S2-D Zone 1 33.07
0176-441-22-0000 Annexation S2-D Zone 1 33.07
0176-441-23-0000 Annexation S2-D Zone 1 33.07
0176-441-24-0000 Annexation S2-D Zone 1 33.07
0176-441-25-0000 Annexation S2-D Zone 1 33.07
0176-441-26-0000 Annexation S2-D Zone 1 33.07
0176-441-27-0000 Annexation S2-D Zone 1 33.07
0176-521-01-0000 Annexation S7-H Zone 2 41.50
0176-521-02-0000 Annexation S7-H Zone 2 41.50
0176-521-03-0000 Annexation S7-H Zone 2 41.50
0176-521-04-0000 Annexation S7-H Zone 2 41.50
0176-521-05-0000 Annexation S7-H Zone 2 41.50
0176-521-06-0000 Annexation S7-H Zone 2 41.50
0176-521-07-0000 Annexation S7-H Zone 2 41.50
0176-521-08-0000 Annexation S7-H Zone 2 41.50
0176-521-09-0000 Annexation S7-H Zone 2 41.50
0176-521-10-0000 Annexation S7-H Zone 2 41.50
0176-521-11-0000 Annexation S7-H Zone 2 41.50
0176-521-12-0000 Annexation S7-H Zone 2 41.50
0176-521-13-0000 Annexation S7-H Zone 2 41.50
0176-521-18-0000 Annexation S7-H Zone 2 41.50
0176-521-19-0000 Annexation S7-H Zone 2 41.50
0176-521-20-0000 Annexation S7-H Zone 2 41.50
0176-521-21-0000 Annexation S7-H Zone 2 41.50
0176-521-22-0000 Annexation S7-H Zone 2 41.50
0176-521-23-0000 Annexation S7-H Zone 2 41.50
0176-521-27-0000 Annexation S7-H Zone 2 41.50
0176-521-28-0000 Annexation S7-H Zone 2 41.50
0176-521-29-0000 Annexation S7-H Zone 2 41.50
0176-521-30-0000 Annexation S7-H Zone 2 41.50
0176-521-31-0000 Annexation S7-H Zone 2 41.50
0176-521-32-0000 Annexation S7-H Zone 2 41.50
Redlands Regular Meeting 06-21-2022 889 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0176-531-01-0000 Annexation S7-H Zone 2 41.50
0176-531-02-0000 Annexation S7-H Zone 2 41.50
0176-531-03-0000 Annexation S7-H Zone 2 41.50
0176-531-07-0000 Annexation S7-H Zone 2 41.50
0176-531-08-0000 Annexation S7-H Zone 2 41.50
0176-531-09-0000 Annexation S7-H Zone 2 41.50
0176-531-12-0000 Annexation S7-H Zone 2 41.50
0176-531-13-0000 Annexation S7-H Zone 2 41.50
0176-531-26-0000 Annexation S7-H Zone 2 41.50
0176-531-18-0000 Annexation S7-H Zone 2 41.50
0176-531-20-0000 Annexation S7-H Zone 2 41.50
0176-531-21-0000 Annexation S7-H Zone 2 41.50
0176-531-22-0000 Annexation S7-H Zone 2 41.50
0176-531-24-0000 Annexation S7-H Zone 2 41.50
0176-531-25-0000 Annexation S7-H Zone 2 41.50
0292-032-39-0000 Original District Zone 3 200.50
0292-032-40-0000 Original District Zone 3 40.10
0292-032-41-0000 Original District Zone 3 60.15
0292-032-42-0000 Original District Zone 3 320.80
0292-033-11-0000 Annexation S1-C Zone 4 231.33
0292-033-13-0000 Annexation S9-D Zone 3 80.20
0292-034-16-0000 Annexation S1-O Zone 3 20.05
0292-063-45-0000 Annexation S7-C Zone 4 42.06
0292-064-13-0000 Annexation S3-H Zone 4 84.12
0292-064-17-0000 Annexation S3-H Zone 4 84.12
0292-064-21-0000 Annexation S3-H Zone 4 84.12
0292-064-22-0000 Annexation S3-H Zone 4 42.06
0292-064-23-0000 Annexation S3-H Zone 4 42.06
0292-064-24-0000 Annexation S3-H Zone 4 147.21
0292-064-25-0000 Annexation S3-H Zone 4 42.06
0292-064-26-0000 Annexation S3-H Zone 4 21.03
0292-064-27-0000 Annexation S3-H Zone 4 21.03
0292-152-39-0000 Annexation S7-B Zone 3 100.25
0292-153-24-0000 Annexation S2-A Zone 3 80.20
0292-153-25-0000 Annexation S2-A Zone 3 80.20
0292-153-26-0000 Annexation S2-A Zone 3 40.10
0292-153-27-0000 Annexation S2-A Zone 3 40.10
0292-153-28-0000 Annexation S10-I Zone 1 & 4 59.43
0292-153-30-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-31-0000 Annexation S10-I Zone 1 & 4 59.43
0292-153-32-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-33-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-34-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-35-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-36-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-37-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-38-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-39-0000 Annexation S10-I Zone 1 & 4 79.24
0292-153-40-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-41-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-42-0000 Annexation S10-I Zone 1 & 4 19.81
0292-153-43-0000 Annexation S10-I Zone 1 & 4 19.81
0292-154-12-0000 Annexation S5-D Zone 3 100.25
0292-154-22-0000 Annexation S10-K Zone 1 & 4 80.96
Redlands Regular Meeting 06-21-2022 890 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0292-154-23-0000 Annexation S10-K Zone 1 & 4 19.45
0292-154-24-0000 Annexation S10-K Zone 1 & 4 19.45
0292-154-25-0000 Annexation S10-K Zone 1 & 4 19.45
0292-156-21-0000 Annexation S1-W Zone 3 120.30
0292-157-16-0000 Annexation S6-A Zone 4 189.27
0292-157-20-0000 Annexation S9-E Zone 1 19.45
0292-157-31-0000 Annexation S2-H Zone 4 21.03
0292-158-17-0000 Annexation S8-B Zone 3 40.10
0292-165-15-0000 Annexation S3-F Zone 3 & 4 222.51
0292-166-11-0000 Annexation S1-K Zone 4 273.39
0292-182-30-0000 Annexation S1-U Zone 4 21.03
0292-182-31-0000 Annexation S1-U Zone 4 21.03
0292-192-11-0000 Annexation S4-E Zone 4 231.33
0292-201-37-0000 Annexation S4-B Zone 3 40.10
0292-201-39-0000 Annexation S4-B Zone 3 47.57
0292-310-07-0000 Annexation S3-B Zone 1 19.45
0292-310-36-0000 Annexation S4-F Zone 1 38.90
0292-310-42-0000 Annexation S10-M Zone 1 19.45
0292-321-10-0000 Annexation S1-G Zone 4 105.15
0292-331-15-0000 Annexation S2-F Zone 3 80.20
0292-331-16-0000 Annexation S2-F Zone 3 80.20
0292-381-08-0000 Annexation S3-G Zone 1 19.45
0292-441-11-0000 Annexation S2-B Zone 3 12.03
0292-441-12-0000 Annexation S2-B Zone 3 12.03
0292-441-13-0000 Annexation S2-B Zone 3 12.03
0292-441-14-0000 Annexation S2-B Zone 3 12.03
0292-441-15-0000 Annexation S2-B Zone 3 12.03
0293-172-16-0000 Annexation S1-B Zone 4 126.18
0293-172-17-0000 Annexation S1-B Zone 4 126.18
0293-172-18-0000 Annexation S1-B Zone 4 21.03
0293-421-01-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-02-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-03-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-04-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-05-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-06-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-07-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-08-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-09-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-10-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-11-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-12-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-13-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-14-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-15-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-16-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-17-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-18-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-19-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-20-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-21-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-22-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-23-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-24-0000 Annexation S9-A Zone 1 & 4 4.50
Redlands Regular Meeting 06-21-2022 891 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0293-421-25-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-26-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-27-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-28-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-29-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-30-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-31-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-32-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-33-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-34-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-35-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-36-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-37-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-38-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-39-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-40-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-41-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-42-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-43-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-44-0000 Annexation S9-A Zone 1 & 4 4.50
0293-421-45-0000 Annexation S9-A Zone 1 & 4 4.50
0294-181-02-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-03-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-04-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-05-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-06-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-07-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-08-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-10-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-11-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-12-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-13-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-14-0000 Annexation S10-S Zone 1 & 3 49.54
0294-181-15-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-01-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-02-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-03-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-04-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-06-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-07-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-08-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-10-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-11-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-12-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-16-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-17-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-18-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-19-0000 Annexation S10-S Zone 1 & 3 49.54
0294-191-20-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-11-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-13-0000 Annexation S10-S Zone 1 & 3 49.54
Redlands Regular Meeting 06-21-2022 892 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0294-201-15-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-19-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-21-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-27-0000 Annexation S10-S Zone 1 & 3 49.54
0294-201-28-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-02-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-03-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-04-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-06-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-07-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-08-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-09-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-10-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-12-0000 Annexation S10-S Zone 1 & 3 49.54
0294-211-13-0000 Annexation S10-S Zone 1 & 3 49.54
0294-222-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-08-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-09-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-10-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-11-0000 Annexation S10-T Zone 1 & 3 36.13
0294-222-12-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-232-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-242-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-01-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-08-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-09-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-10-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-11-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-12-0000 Annexation S10-T Zone 1 & 3 36.13
0294-252-13-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-01-0000 Annexation S10-T Zone 1 & 3 36.13
Redlands Regular Meeting 06-21-2022 893 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
0294-262-02-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-03-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-04-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-05-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-06-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-07-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-08-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-09-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-10-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-11-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-12-0000 Annexation S10-T Zone 1 & 3 36.13
0294-262-13-0000 Annexation S10-T Zone 1 & 3 36.13
1212-021-01-0000 Annexation S10-D Zone 1 16.94
1212-021-02-0000 Annexation S10-D Zone 1 16.94
1212-021-03-0000 Annexation S10-D Zone 1 16.94
1212-021-04-0000 Annexation S10-D Zone 1 16.94
1212-021-05-0000 Annexation S10-D Zone 1 16.94
1212-021-06-0000 Annexation S10-D Zone 1 16.94
1212-021-07-0000 Annexation S10-D Zone 1 16.94
1212-021-08-0000 Annexation S10-D Zone 1 16.94
1212-021-09-0000 Annexation S10-D Zone 1 16.94
1212-021-10-0000 Annexation S10-D Zone 1 16.94
1212-021-11-0000 Annexation S10-D Zone 1 16.94
1212-021-12-0000 Annexation S10-D Zone 1 16.94
1212-021-13-0000 Annexation S10-D Zone 1 16.94
1212-021-14-0000 Annexation S10-D Zone 1 16.94
1212-021-15-0000 Annexation S10-D Zone 1 16.94
1212-021-16-0000 Annexation S10-D Zone 1 16.94
1212-021-17-0000 Annexation S10-D Zone 1 16.94
1212-021-18-0000 Annexation S10-D Zone 1 16.94
1212-021-19-0000 Annexation S10-D Zone 1 16.94
1212-021-20-0000 Annexation S10-D Zone 1 16.94
1212-021-21-0000 Annexation S10-D Zone 1 16.94
1212-021-22-0000 Annexation S10-D Zone 1 16.94
1212-021-23-0000 Annexation S10-D Zone 1 16.94
1212-021-24-0000 Annexation S10-D Zone 1 16.94
1212-021-25-0000 Annexation S10-D Zone 1 16.94
1212-021-26-0000 Annexation S10-D Zone 1 16.94
1212-021-27-0000 Annexation S10-D Zone 1 16.94
1212-021-28-0000 Annexation S10-D Zone 1 16.94
1212-021-29-0000 Annexation S10-D Zone 1 16.94
1212-021-30-0000 Annexation S10-D Zone 1 16.94
1212-021-31-0000 Annexation S10-D Zone 1 16.94
1212-021-32-0000 Annexation S10-D Zone 1 16.94
1212-021-33-0000 Annexation S10-D Zone 1 16.94
1212-021-34-0000 Annexation S10-D Zone 1 16.94
1212-021-35-0000 Annexation S10-D Zone 1 16.94
1212-021-36-0000 Annexation S10-D Zone 1 16.94
1212-021-37-0000 Annexation S10-D Zone 1 16.94
1212-021-38-0000 Annexation S10-D Zone 1 16.94
1212-021-39-0000 Annexation S10-D Zone 1 16.94
1212-021-40-0000 Annexation S10-D Zone 1 16.94
1212-021-41-0000 Annexation S10-D Zone 1 16.94
1212-021-42-0000 Annexation S10-D Zone 1 16.94
Redlands Regular Meeting 06-21-2022 894 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
1212-021-43-0000 Annexation S10-D Zone 1 16.94
1212-021-44-0000 Annexation S10-D Zone 1 16.94
1212-021-45-0000 Annexation S10-D Zone 1 16.94
1212-021-46-0000 Annexation S10-D Zone 1 16.94
1212-021-47-0000 Annexation S10-D Zone 1 16.94
1212-021-48-0000 Annexation S10-D Zone 1 16.94
1212-021-49-0000 Annexation S10-D Zone 1 16.94
1212-021-50-0000 Annexation S10-D Zone 1 16.94
1212-021-51-0000 Annexation S10-D Zone 1 16.94
1212-021-52-0000 Annexation S10-D Zone 1 16.94
1212-021-53-0000 Annexation S10-D Zone 1 16.94
1212-021-54-0000 Annexation S10-D Zone 1 16.94
1212-021-55-0000 Annexation S10-D Zone 1 16.94
1212-021-56-0000 Annexation S10-D Zone 1 16.94
1212-021-57-0000 Annexation S10-D Zone 1 16.94
1212-021-58-0000 Annexation S10-D Zone 1 16.94
1212-021-59-0000 Annexation S10-D Zone 1 16.94
1212-021-60-0000 Annexation S10-D Zone 1 16.94
1212-021-61-0000 Annexation S10-D Zone 1 16.94
1212-021-62-0000 Annexation S10-D Zone 1 16.94
1212-041-01-0000 Annexation S7-F Zone 1 77.80
1212-191-60-0000 Annexation S1-X Zone 1 19.45
1212-191-61-0000 Annexation S1-X Zone 1 19.45
1212-191-62-0000 Annexation S1-X Zone 1 19.45
1212-191-63-0000 Annexation S1-X Zone 1 19.45
1212-191-64-0000 Annexation S1-X Zone 1 19.45
1212-191-65-0000 Annexation S1-X Zone 1 19.45
1212-191-66-0000 Annexation S1-X Zone 1 19.45
1212-191-67-0000 Annexation S1-X Zone 1 19.45
1212-191-68-0000 Annexation S1-X Zone 1 19.45
1212-191-69-0000 Annexation S1-X Zone 1 19.45
1212-191-70-0000 Annexation S1-X Zone 1 19.45
1212-191-71-0000 Annexation S1-X Zone 1 19.45
1212-191-72-0000 Annexation S1-X Zone 1 19.45
1212-191-73-0000 Annexation S1-X Zone 1 19.45
1212-191-74-0000 Annexation S1-X Zone 1 19.45
1212-191-75-0000 Annexation S1-X Zone 1 19.45
1212-191-76-0000 Annexation S1-X Zone 1 19.45
1212-191-77-0000 Annexation S1-X Zone 1 19.45
1212-191-78-0000 Annexation S1-X Zone 1 19.45
1212-191-79-0000 Annexation S1-X Zone 1 19.45
1212-201-01-0000 Annexation S3-E Zone 1 25.93
1212-201-02-0000 Annexation S3-E Zone 1 25.93
1212-201-03-0000 Annexation S3-E Zone 1 25.93
1212-201-04-0000 Annexation S3-E Zone 1 25.93
1212-201-05-0000 Annexation S3-E Zone 1 25.93
1212-201-06-0000 Annexation S3-E Zone 1 25.93
1212-201-07-0000 Annexation S3-E Zone 1 25.93
1212-201-08-0000 Annexation S3-E Zone 1 25.93
1212-201-09-0000 Annexation S3-E Zone 1 25.93
1212-201-10-0000 Annexation S3-E Zone 1 25.93
1212-201-11-0000 Annexation S3-E Zone 1 25.93
1212-201-12-0000 Annexation S3-E Zone 1 25.93
1212-201-13-0000 Annexation S3-E Zone 1 25.93
Redlands Regular Meeting 06-21-2022 895 of 1716
APN SITUS ADDRESS ANNEXATION ZONE CHARGE
City of Redlands
Street Lighting District No. 1 - Appendix D
Fiscal Year 2022-23
Assessment Roll (Sorted by APN)
1212-201-14-0000 Annexation S3-E Zone 1 25.93
1212-201-15-0000 Annexation S3-E Zone 1 25.93
1212-201-16-0000 Annexation S3-E Zone 1 25.93
1212-201-17-0000 Annexation S3-E Zone 1 25.93
1212-201-18-0000 Annexation S3-E Zone 1 25.93
1212-201-19-0000 Annexation S3-E Zone 1 25.93
1212-201-20-0000 Annexation S3-E Zone 1 25.93
1212-201-21-0000 Annexation S3-E Zone 1 25.93
1212-201-22-0000 Annexation S3-E Zone 1 25.93
1212-201-23-0000 Annexation S3-E Zone 1 25.93
1212-201-24-0000 Annexation S3-E Zone 1 25.93
1212-201-25-0000 Annexation S3-E Zone 1 25.93
1212-201-26-0000 Annexation S3-E Zone 1 25.93
1212-201-27-0000 Annexation S3-E Zone 1 25.93
1212-431-02-0000 Annexation S9-F Zone 3 100.25
Summary Fields Value
APN total count: 987
CHARGE total sum: $25,452.67
Redlands Regular Meeting 06-21-2022 896 of 1716
City Council Meeting K. 1.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a determination of exemption pursuant to Sections 15378(b)(5), 15308 and 15061(b)(3) of the California
Environmental Quality Act Guidelines; and consideration of Urgency Ordinance No. 2934 establishing a temporary 45-day moratorium on new warehouses and distribution facility
development projects within the City of Redlands (Development Services Director Desatnik)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
Mayor requests the City Clerk to read the title of Urgency Ordinance No. 2934.
I move to waive further reading of Urgency Ordinance No. 2934 and to adopt Urgency Ordinance No. 2934 and further find that the Urgency Ordinance is exempt pursuant to Sections 15378(b)(5), 15308 and 15061(b)(3) of the California Environmental Quality.
RECOMMENDATION:
Staff recommends that City Council adopt Urgency Ordinance No. 2934 and find that the Urgency Ordinance is exempt pursuant to Sections 15378(b)(5), 15308 and 15061(b)(3) of the California Environmental Quality.
BACKGROUND:
On February 22, 2022, the Planning Commission discussed the status of recent new development projects for warehouses and distribution facilities, and also reviewed the housing sites inventory list contained in the new 2021-2029 Housing Element. Commissioners cited concerns about the volume of large trucks and traffic impacts, greenhouse gas emissions and air quality impacts, Redlands Regular Meeting 06-21-2022 897 of 1716
trucks and traffic impacts, greenhouse gas emissions and air quality impacts, on-street parking by trucks, and potential impacts to sensitive uses such as nearby residential areas. The Commission voted unanimously to recommend that the City Council consider adopting a temporary moratorium on new warehouses and distribution facilities so that staff could study the land use and environmental impact issues in greater depth and develop potential long-term policies and solutions.
DISCUSSION:
The rapid expansion of e-commerce and consumer spending in recent years has driven demand for more warehouses, logistics facilities, and distribution facilities (referred to collectively as “warehouses”) in the Inland Empire region, including Redlands and surrounding communities. Such facilities typically include uses and activities such as freight receiving, sorting, handling, storing, warehousing, keeping inventory, freight forwarding, distribution to wholesalers and retailers, and “last mile” delivery services direct to consumers. The types of merchandise are varied and often include finished products ready for retail delivery (e.g., consumer products, goods, wares, consumables, etc.), materials or textiles, components or parts used for manufacturing or assembly of finished products, and similar items at various stages of the production process. Other merchandise or materials are simply transiting through the region, from receiving and off-loading at the ports, to their ultimate destinations to the rest of the nation.
Some of the largest local warehouses, many exceeding one million square-feet in size, are operated or otherwise associated with online retailers (e.g., Amazon, Walmart, and others) and also generate hundreds or thousands of daily vehicle trips by independent contractors using their personal or company vehicles for “last mile” direct delivery to consumers. Large warehouses often operate 24 hours daily, generate large amounts of truck trips at all hours (for maximum efficiency), and increasingly are also generating large amounts of other vehicle trips (such as personal vehicles or company vans for delivering direct to consumers).
Over the past five years, several new development projects for large warehouses and distribution facilities have been approved and constructed within the East Valley Corridor Specific Plan area (see Attachment A-1), as well as several warehouse/distribution facilities in the County unincorporated area known as the “donut hole” generally located north of Interstate 10 to the Santa Ana River and west of Interstate 210 to the City’s boundary along Mountain View Avenue (see Attachment A-2). As individual development projects, each proposal previously underwent environmental review in compliance with the California Environmental Quality Act.
Large warehouse and distribution facilities (over 50,000 square feet in gross floor area) can generate unique environmental impacts on surrounding properties and the larger community including hundreds or thousands of trips by large trucks (including tractor-trailers) at all hours throughout the day and night, greenhouse Redlands Regular Meeting 06-21-2022 898 of 1716
(including tractor-trailers) at all hours throughout the day and night, greenhouse gas emissions and air quality impacts associated with vehicle trips, noise impacts from on-site operations and off-site truck trips on City streets, and other potential impacts upon sensitive receptors such as residences, schools, daycare centers, and such other locations.
Large trucks travel on most major corridors in the City of Redlands, some of which are designated Truck Routes while others are not designated truck routes, to reach their destinations within and around Redlands. The many warehouse facilities in the unincorporated “donut hole” area is a good example of this traffic pattern; those trucks have no other routes to access the “donut hole” area other than to utilize the freeway ramps within the City of Redlands and then use some segment of Redlands’ roadways before entering the unincorporated area. The locations of five (5) freeway on/off ramps in Redlands (a total of 10 signalized intersections) that provide access to the “donut hole” area necessitate the trucks transiting on Redlands’ streets even though they may not have their ultimate destinations in Redlands. These large trucks create unique and challenging traffic issues because of their size, sheer volume of trips (which continues to increase), and increasing frequency of transiting through Redlands at all hours of the day and night. Related impacts include:
Traffic congestion and reduced level of service on City streets and at intersections;
Partial or complete obstructions to intersection operations, traffic flow, and access by emergency vehicles responding to emergency calls; Increased safety risk for smaller vehicles, bicyclists, and pedestrians; and, Weight of trucks and damage to City streets and facilities (traffic signal equipment, street lights, traffic control signs, curbs, medians, trees, etc.).
Several chapters of Title 18 (Zoning Regulations) of the Redlands Municipal Code contain the regulations and development standards for commercial and industrial districts, most of which have not been updated in many years, and some do not appear to have been updated since original adoption in 1955.
Therefore, the continued and unabated construction of new warehouse/distribution facilities may pose an immediate threat to the public health, safety, and welfare. This Urgency Ordinance is proposed so that the City Council has time to study whether the City’s zoning code’s provisions give the City sufficient tools and standards to address the land use conflicts and related issues that could be created by further approvals of large warehouse/distribution facilities in 2022 and moving forward, or whether changes to the zoning regulations are required in order to address the above-identified public health, safety, and welfare impacts.
Purpose of Moratorium
Redlands Regular Meeting 06-21-2022 899 of 1716
Purpose of Moratorium
To avoid or reduce the aforementioned adverse impacts and threats to the public health, safety, and welfare, the City Council may consider adopting, by Urgency Ordinance, a temporary moratorium on land use approvals and building permits for new warehouses and distribution facilities. This will allow the City sufficient time to study the land use and environmental impacts of such development projects, as well as allow for a deliberate approach to study and develop appropriate policies, development standards, and effective conditions of approval to mitigate the public health, safety, and welfare effects of large warehouses and distribution facilities.
The list below identifies examples of the tasks that City staff will undertake during the moratorium:
Evaluate the operating characteristics of different types and sizes of warehouses and distribution facilities to better understand land use impacts, and develop appropriate policies, development standards, and/or operating conditions that can alleviate land use conflicts or impacts.
A.
Evaluate the City’s existing zoning districts that permit warehouse and distribution facilities, identify the proximity to existing sensitive receptors and residential zones, and identify appropriate development standards and/or operating conditions for warehouse/distribution facilities to buffer nearby different land uses (such as screening or landscaping, hours of operation, air quality mitigations or design features, intensity of use, number of large truck trips per day, designated routes for large trucks, etc.).
B.
Evaluate the City’s designated Truck Routes, and examine whether existing truck routes must be modified or improved to accommodate the volume and frequency of large truck trips (including roadway segments, intersections, traffic signals and signage, etc.), and ensure the best protection of the abutting or nearby residential neighborhoods and educational land uses.
C.
Evaluate the locations of existing points of origin and destination for large trucks, develop land use recommendations and preferences for locating large warehouses and distribution facilities, and examine the need for any changes to land use designations or zoning designations.
D.
Effects of Moratorium
The zoning districts and other Specific Plan areas that would be subject to this moratorium include the following (click here for interactive Zone Map online):
Commercial Industrial (C-M) District;
Industrial (I-P) District;
Light Industrial (M-1) District;
General Industrial (M-2) District;
Redlands Regular Meeting 06-21-2022 900 of 1716
General Industrial (M-2) District;
East Valley Corridor Specific Plan (all districts);
Downtown Specific Plan (all districts);
Specific Plan No. 25 (all districts);
Concept Plan No. 1; and,
Concept Plan No. 2.
There are currently four Development Applications that have been submitted to the City for new large warehouse and distribution facilities that may possibly be affected if the proposed moratorium is adopted, as listed below.
Planned Development No. 5 (submitted 7/27/2021): a proposal to construct a 353,224 square-foot warehouse/distribution facility on 16 acres located at 1101 California Street (adjacent to Interstate 10 freeway) in the East Valley Corridor Specific Plan.
1. Commission Review & Approval no. 938 (submitted 10/26/2021): a proposal to construct a 185,100 square-foot warehouse/distribution facility on 9.4 acres located at 350 Iowa Street in the Commercial Industrial (EV/IC) district of the East Valley Corridor Specific Plan.
2. Commission Review & Approval No. 947 (submitted 5/20/2022): a proposal to construct a 346,069 square-foot warehouse/distribution facility on 16 acres located at 1660 Sessums Drive (south of Redlands Municipal Airport) in the Industrial (I-P) district.
3. Commission Review & Approval No. 948 (submitted 5/25/2022): a proposal to construct a 212,620 square-foot warehouse/distribution facility on 10 acres located at 301 Tennessee Street in the Industrial (I-P) District.
4. Pursuant to the Urgency Ordinance, only projects which have received full entitlements, including all necessary CEQA approvals, for warehouse or distribution facility projects and have commenced substantial construction or incurred expenses in connection with such construction prior to the effective date of this Urgency Ordinance, and for which all applicable appeal periods have run, shall be considered exempt from application of this Urgency Ordinance.
Environmental Review
The adoption of this Urgency Ordinance is exempt from environmental review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15378(b)(5), 15308, and/or 15061(b)(3), in that the proposal will not in a direct or reasonably foreseeable indirect physical change in the environment nor have a significant impact on the environment.
Redlands Regular Meeting 06-21-2022 901 of 1716
ALTERNATIVES:
The City Council can continue the proposal and direct staff to address any further issues.
STRATEGIC PLAN:
Priority B: Public Health and Safety. Enhance services and programs so that all community members are safe, sheltered, and have access to Redlands' core services.
SUBMITTED BY:
Brian Desatnik, Development Services Director
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Brian Foote, City Planner/Planning Manager
Fiscal Impact
Fiscal Year: 21-22
Appropriation Required Y/N: No
Discussion:
There is no fiscal impact associated with this item.
Attachments
Attachment A-1: Zone Map
Attachment A-2: Zone Map (donut hole area)
Attachment B: Urgency Ordinance No. 2934
Redlands Regular Meeting 06-21-2022 902 of 1716
R-S
R-1
R-1
R-E
A-1
R-1
C-3 R-1
O
R-E
A-1
R-S
R-S
R-S
R-1
R-S
C-1
R-S
R-S
R-2
R-1
EV/SD
R-1
C-1
R-2
CP4 R-2
A-1 M-1
MHP/
R-S
R-1
R-2
R-1
R-E
R-S
E
R-1
R-1
R-S
R-1
R-S
R-S
R-1
R-1
A-D
R-S
R-1
EV/PI
C-4
O
EV/AP
R-2-2000
R-S
EV/CG
C-2
R-1
R-2
SP23
R-S
R-1
PRD/R-S
EV/PI
R-S
R-E
E
A-P
C-4
R-1
R-S
R-2
R-1
R-S
EV/AP
EV/AP
PRD/R-E
EV/CG
SP29
EV/SRP
O
R-S
R-1
R-1
R-1
R-S
R-S
R-2
A-1
O
R-S
R-2
R-2
R-1
R-1
R-S
R-3
EV2500RM
EV/CG
A-1
A-1
M-1
O
R-S
EV/IC
A-1
A-P
R-2
R-S
R-2
SP58
C-M
O
R-S
CP-1 E
R-S
R-1
R-1
M-2 R-1
R-S
R-S
R-S
R-2
R-2
R-1
A-1
R-1
A-1
R-S
R-1
R-1
R-1
R-E
R-1
R-S
R-S
O
R-S
R-1
R-2
R-1D
R-1D
R-1
EV/CG
R-2 R-1
R-S
A-P-C
PRD/R-1
R-S
C-4
R-S
R-S
R-1
R-1
R-E
R-2
R-E
R-S
R-S
R-S
R-1
R-1
EV/IC
R-1
EV/TC
R-1
PRD/RE
EV/IC
R-S
R-1
CP-2
R-1
SP23
R-S
R-S
R-1
SP55
E
R-1
R-1
R-S
A-P
R-1D
R-1
R-1
R-1
R-S
R-2
I-P
R-1
A-1
R-S
R-S
EV/CG
A-1
O
R-S
R-S
R-2
EV/SRP
R-E
R-2
R-S
R-1
R-1
R-S
C-1
R-1
R-1
R-1
R-S
R
S
A-P
R-E
O
A-1
EV/CG
R-S
R-1
R-E
R-1
M-F
R-2
R-S
EV/CG
R-1
O
R-S
EV3000RM
R-1
R-S
EV/IC R-1
R-1
R-1D
R-1
R-1 R-2
MHP/R-1
R-1
R-S
R-E
R-2
E
R-2
R-1D
R-2
R-2
PRD/R-S
R-1
R-1
R-1
R-2
R-1
C-4
R-E
R-S
R-2-2000
T
R-E
A-P-C
R-1
R-1
R-1 M-1
R-2
O
SP61
E
R-2-2000
R-E
R-S
R-S
A-1
R-S
R-1
R-S
R-S
FP-1
R-S
R-2
R-3
R-2
R-1
R-1
PRD/R-S
R-1
R-S
R-S
R-S
R-E
A-P
R-1
R-1
R-S
SP39
R-3
R-2
EV/CG
R-S
E
R-1
R-1
EV/IC
R-1D
R-1
R-E
R-S
R-1
EV/PI
O
R-S
R-1
E R-1
R-S
C-M R-1
R-2
R-S
R-S
EV/CG
R-1
R-1
E
R-E
R-1D
R-2
R-S
R-2
R-1
R-1
R-2-2000
A-1 C-4
R-1
R-1
R-S
R-2
R-1
R-2
R-1
R-E
C-2
EV/CG
R-S
R-2
R-1
R-1
R-S
EV/CG
A-1
R-1
R-E
R-S
E
R-1
R-S
R-S
EV/CG
R-1D
EV2500RM
R-2
R-E
CP-2
R-2-2000
E
R-1
PRD/R-E
O
SP41
R-2
R-1
R-1
E
R-S
R-1
EV/CG
R-1
A-P
R-2
R-1
R-S
R-2
R-1
O
M-F
O
R-S
C-2
A-1
EV/PI
A-1
R-2
R-S
R-1
R-1
R-3
O
E
CP-1
R-1
R-1 R-1
R-S
R-S R-S
EV2500RM
R-S
R-1
EV/SD
C-2
R-E
R-S
E
R-S
R-2
EV/CG
R-E
R-S
EV/IC
R-1
R-1
R-E
R-1
R-2-2000
R-S
R-1 R-1
C-4
R-1
R-S
O
R-1
O
M-2
R-S
M-1
R-1
EV/CG
R-S
R-1
R-S
R-S
R-E
EV/CG
EV/PI
SP33
EV/CG
R-1
R-E
R-1
SP26
R-2
R-1
R-S
C-4
A-2
R-3
E
R-S
R-S
SP25
PRD/
R-E
R-1
R-S
R-E
R-1
R-S
PRD/R-S
C-4
R-1
R-S
R-E
R-E
A-P
EV/CG
R-1
R-S
O
R-S
R-1
R-S
R-2
R-1
R-2
O
C-1
R-S
C-4
R-1
MHP/R-1
SP32
R-S
R-2
R-2
R-1
R-2
EV2500RM
R-1
R-2-2000
R-S
R-S
R-1
O
A-1
R-3
O
EV/CG
C-M
O
R-S
R-1
R-1D
R-2
R-S
R-2
R-1
R-2-2000
R-1
R-1
A-P
R-2
R-2-2000
R-2
R-2
R-1
R-1
C-4 R-1
T
R-1
R-1
R-2
R-1
R-1 PRD/R-1
PD3
O
R-S
O
R-1
A-1
R-S
R-S
PRD/R-S
R-1
PRD/RE
R-E
R-1
PRD/R-E
R-2
EV/IC
P D 1
C-4
R-1
R-1
R-3 R-S
EV/IC
R-1
R-1
R-S
A-2
R-1D
O
M-P
R-2
EV/SD
R-1D
R-1
R-S R-S
R-S
R-S
A-1
R-2
EV/AP
EV/IC
SP25
R-1
O
R-1
E
R-S
R-S
R-S
R-2
R-1
R-1
P
R-S
R-S
T
R-S
O
R-S
R-2
R-1
R-1 R-E
R-S
R-2
R-2
R-1
R-1
R-S
R
S
R-1
R-S
R-S
R-S
R-1
R-1
R-1
R-E
O
R-S
R-S
R-E
R-2-2000
C-M
R-1
A-1
R-2-2000
R-S
R-1
R-1
R-2
EV/PI
R-1D
MHP/R-1
R-E
O
R-3
EV/SD
R-E
EV/AP
SP25
EV/IC
R-2
R-S
EV/CG
R-1
R-E
O
R-E
R-S
R-2
R-1
R-S
R-E
R-1
R-A
R-S
EV/CG
R-E
R-S
R-S
A-P
SP42
FP
R-S
EV/IC
R-1
R-1
R-S
R-S
R-S
M-2
R-S
R-1
R-E
R-S
R-S
R-1
R-1
R-S
R-2
R-1
R-1
A-1
R-2
R-1D
R-S
R-1
R-1
M-1
R-S
EV/IC O
R-1
R-2
I-P
R-1
R-S
R-S
O
R-2-2000
R-1
R-1
SP52
O
E
EV/CG
R-S
T
M-2
SP33
MHP/R-1
R-S
C-1
R-1D
EV/CG
R-1
R-1
R-E
R-3
R-1
R-1 A-1
R-2
R-1
R-S
R-1
R-1
C-4
R-1
O
FP
EV/CG
R-1
CP-1
M-F
R-1
M-1
R-3
R-1
R-1
R-1
R-S
E
R-S
PRD/R-1
R-S
R-S
FP-1
R-2
R-2
R-2
R-2
R-S
R-S
R-S
R-S
R-S
EV/CG
A-P
R-2
SP61
A-1
R-E
R-1D
O
R-2
R-S
R-1
R-1
M-P
O
R-1
R-2
E
FP
R-1
PRD/RE
R-E
R-2
R-1D
R-1
R-1
R-1
R-2
R-1D
R-1
R-1
R-S
R-S
R-2
R-S
R-E
O
R-E
A-1
R-1
R-E
R-S
R-S
A-P
R-1
R-1D
R-S
R-S
R-S
R-1
R-2
R-1
R-1
E
R-1D
R-1
R-1
R-S
R-S
O
EV/IC
R-S
EV/IR
R-2 R-2
R-1 R-1
R-S
A-1
R-2
I-P
R-S
M-1
R-1
C-4
R-1
R-1
R-S
O
SP25
R-1
A-1
R-2
R-1
R-E
SP23
R-S
EV/IC
SP25
C-M
O
SP33
R-1
R-E
R-1
R-1
R-1
R-S
I-P
O
M-1
R-S
O
EV/IC
R-1
R-1
R-S
R-1
R-1
R-2-2000
R-1
T
R-2
R-S
R-1
R-1
R-1
C-M
R-1
R-E
R-S
R-S
EV3000RM
MHP
R-1
R-S
A-1
R-2
R-2
R-S
R-1D
SP56
FP-1
R-2
M-1
R-1
R-S
R-S
R-2
R-1D
O
A-1
R-1
R-1
R-1
C-4
R-S
R-2-2000
A-P
R-1
R-2
R-1
R-S
A-1
R-S
SP57
R-S
R-2
R-S
EV/CG
E
R-1
R-1
R-2
R-S
E
R-S
R-1
R-1
M-1
PRD/R-S
R-2
R-1
R-2
EV/CG
R-1
R-E
A-P
R-1
R-1
R-E
R-S
EV3000RM
A-P
R-1
A-1
O
SP54
R-1
R-1
O
R-1
R-S
R-S
R-1
A-P
E
R-2
A-D
R-S
R-S
PRD/R-S
SP25
EV/CG
R-S
R-2
R-2
M-1
A-1
R-S
A-P
R-1
R-1
R-1
R-2
R-1
R-S
R-S
EV/CG
R-S
R-S
R-E
R-2
R-1
R-E
R-E
R-2
E
PRD/R-1
T
R-S
O
R-S
R-S
R-S
R-S
R-1
R-1
R-S
M-1
CP-2
R-E
R-S
C-1
O
R-2-2000
R-2
E
EV/IC
R-1
EV/IC
R-1
SP61
R-E
I-P
R-1
R-1
R-E
R-S
R-S A-2
T
R-2
R-E
EV/SD
P D 4
SP6 2
SP6 4
SC
TC-H
TC TC
SC
TEXAS ST
N 6TH ST
CAJON ST
ALABAMA ST
5TH AVE
N WABASH AVE
NEVADA ST
S WABASH AVE
5TH AVE
BARTON RD
E LUGONIA AVE
N DEA
RBORN
ST
ALABAMA ST
W PIONEER AVE
ORANGE ST
BEAUMONT AVE
SAND CANYON RD
MARIGOLD AVE
PALMETTO AVE
W LUGONIA AVE
BEAUMONTAVE
BOW C
FOX CT
SLATE ST
N 5TH ST
ROBIN CT
LONG ST
MORO ST
S OAK ST
DOVE CT
9TH ST
VERNA CT
FINO CT
10TH ST
11TH ST
LUGO DR
ROSE ST
MOSS ST
7TH ST
TUDOR CT
FINCH AVE
LISA LN
VIA RIO
ALTA ST
OHIO ST
CLAY ST
VIA LIDO
DEWITT DR
LARGO CT
SPADE DR
LINDA AVE
DALLAS PL
PHLOX AVE
GWENT ST
MEYER ST
EARP
D
R
ANSLEY LN
CLAIRE AVEPENNY LN LIV CT
PINE AVE
SALIC ST
WILE Y
S
T
MYRTLE ST
SONORA ST
NORDINA ST
W BLVD
CITRUS AVE GRANT ST
U BLVD
S 4TH ST
CAMELOT DR
West DR
JUANITA ST
VERNA LN
MAPLE AVE
OAK ST
LINDA PL
LUCAS LN
1ST ST
QUARRY ST
POST ST
Y BLVD
AVIATION DR
OLIVINE AVE
LA COLINA DR
CRAFTON AVE
EAST D R
CORNELL AVE
BERYL AVE
NEWPORT RD
CORNELL ST
KANSAS ST
CALIFORNIA ST
MARION RD 7TH ST
ANZIO AVE
ORCHARD WAY
PANORAMA DR
N CHURCH ST
CHUR
C
H
S
T
FLORIDA ST
JUDSON ST
TENNESSEE ST
W CITRUS AVE
W PARK AVE
OPAL AVE
AGATE AVE
NICE AVE
B ST
IOWA ST
NEW YORK ST
6TH AVE TURQUOISE AVE
S
APPH
RI E
ST
ORANGE AVE
E CITRUS AVE
CON E CAMP RD
NICE AVE
E 10 FRWY
W
ALNUT ST
THE TERRACE
S
U
NRISEWAY
CAPRI AVE
NEVADA ST
E 210 FRWY
CR
F
A
TON AVE
E 10 FRWY E 10 FRWY
GREENSPOT RD
CHRYSOLITE AVE
JASPER AVE
E COLTON AVE
RIVER BLUFF AVE
E 10 FRWY
OPAL AVE
HIGHLAND AVE
K
NI G ST
W 10 FRWY
W 10
TO 210 FRWY
W 10 FRWY
RESERVOIR RD
DOMESTIC AVE
DISHONG ST
3RD AVE
W PIONEER AVE
LASHEART DR
E 210 FRWY
MILL ST
OVE RCRESTDR
SESSUMS DR
ALMOND AVE
W 210 FRWY
CONE CAMP RD
Redlands Regular Meeting 06-21-2022 903 of 1716
R-1
C-3 R-1
R-1
R-S
EV/SD
R-1
CP4 R-2
R-2
R-1
R-1
R-1
R-1
EV/PI
C-4
EV/CG
C-2
R-1
R-2
E
C-4
R-1
EV/CG
SP29
EV/SRP
O
R-1
R-1
R-1
R-1
R-2
EV/CG
A-1
A
EV/IC
R-2
R-2
C-M
CP-1 E
M-2 R-1
R-2
R-1
R-1
R-1
R-1
R-1
O
R-2
R-1D
R-1D
R-1
EV/CG
R-2 R-1
A-P-C
C-4
R-1
R-2
R-1
EV/TC
R-1
PRD/RE
EV/IC
CP-2
R-1
EV/IC
R-1
E
R-1
R-1
R
I-P
A-1
R-1
EV/CG
A-1
EV/SRP
R-2
R-1
C-1
R-1
R-1
O
EV/CG
R-S
R-1
R-1
EV/CG
R-1
O
R-1
EV/IC
R-1
R-1
R-1D
R-1
R-1D
R-2
R-2
R-1
R-2
R-1
R-E
T
R-1
R-1
O
SP61
R-1
FP-1
R-1
R-2
R-1
R-S
A
P
EV/CG
R-2
R-1
R-1
R-1D
R-1
EV/IC
EV/PI
E R-1
C-M
EV/CG
R-1
R-2
R-1D
R-1
R-2
R-1
R-1
R-1
R-1
EV/CG
R-1
R-1
EV/CG
A-1
R-1
R-1
E
EV/CG
R-1D
CP-2
R-1
E R-2
R-1
EV/CG
R-1
R-2
R-1
A-1
EV/PI
R-1
R-1
CP-1
R-1
R-1 R-1
EV/SD
C-2
R-E
E
R-2
EV/CG
EV/IC
R-1
C-4
R-1
O
R-1
M-1
R-1
EV/CG
EV/CG
SP33
EV/CG
R-1
R-2
R-1
C-4
E
SP25
R-1
R-1
EV/CG
R-1
O
R-1
R-1
R-2
R-1
MHP/R-1
R-2
EV2500RM
R-S
O
EV/CG
O
O
R-1D
R-1
R-1
R-1
C-4
T
R-1
R-1
R-2
PD3
A-1 R-1
P D 1
EV/IC
C-4
R-1
R-1 R-1
EV/IC
R-1
R-1D
EV/SD
M-P
R-1
R
EV/IC
SP25
R-1
R
R-1
T R-2
R-2
R-1
R-1
C-M
R-1
R-1
R-1
R-2
EV/PI
R-1D
EV/SD
SP25
EV/IC
R-2
EV/CG
R-1
O
R-1
R-S
R-2
EV/CG
R-E
SP42
R-1
EV/IC
R-1
M-2
R
S
R-1
R-2
R-2
R-1D
R-1
EV/IC O
R-1
I-P
R-1
E
EV/CG
M-2
SP33
R-1D
EV/CG
R-1
R-1
R-1
R-1
R-1
C-4
R-1
EV/CG
CP-1
M-1
R-1
R-1
E
PRD/R-
R-2
R-2
FP-1
EV/CG
SP61
R-1D
R-2
R-1
M-P
O
PRD/RE
E
R-1
R-1
R-1
R-1
R-1D
R-1
R-1
R-1D
R-E
A-P
R-1
R-1D
R-2
R-1D
EV/IR
EV/IC
R-1 R-1
I-P
M-1
C-4
R-1
R-1
SP25
R-1
O
R-1
EV/IC
SP25
C-M
O
SP33
R-1
R-1
R-1
O
R-1
EV/IC
R-1
T
R-1
R-1
R-1
C-M
R-1
R-1D
R-2
R-1
FP-1
R-2
O
R-1D
R-1
R-2
R-1
R-2
EV/CG
E
R-1
R-1
EV/CG
R-1
R-1
A-P
O
R-1
R-1
A-P
E
SP25
EV/CG
M-1
R-1
R-2
R-1
EV/CG
R-1
R-2
O
R
M-1
CP-2
R-E
O
EV/IC
R-1
EV/IC
R-1
SP61
R-1
I-P
R-2
EV/SD
P D 4
SP62
SP64
SC
TC-H
TC TC
SC
ORANGE ST
N 6TH ST
N CHURCH ST
ALABAMA ST
NEVADA ST
W PIONEER AVE
W LUGONIA AVE
W COLTON AVE
MOUNTAIN VIEW AVE
E LUGONIA AVE
TEXAS ST
NEVADA ST
W REDLANDS BLVD
CALIFORNIA ST
ALABAMA ST
W REDLANDS BLVD
E CITRUS AVE
E CENTRAL AVE
ORANGE ST
MISSION RD
MARIGOLD AVE
W SAN BERNARDINO AVE
PALMETTO AVE
W LUGONIA AVE
10TH ST
RUIZ ST
BYBEE LN
1ST ST
DUKE ST
MORO ST
ELM AVE
8TH ST
MEAD ST
KARON ST
N 5TH ST
9TH ST
E HIGH AVE
ELISE DR
VERNA CT
LUGODR
E CLARK ST
E STATE ST
3RD ST
E VINE ST
BEATTIE LN7TH ST
ARIZONA ST
CURTIS ST
TUDOR CT
DAHLIA AVE
DIVISION ST
BA
RBR A LN
HERALD ST
TRIBUNE ST
CALHOUN ST
LAWTON ST
OHIO ST
CLAY ST
ALTA ST
MYR TLE S
T
11TH ST
HOWARD PL
ESSEX CT
SPADE DR
OXFORD DR
MEYER ST
W PEARL AVE
ROSENA AVE
KENDALL ST N EUREKA ST
S 4TH ST
E 210 FRWY
SHEDDEN DR
MYRTLE ST
C
A
MELLIA
LN
GRANT ST
CITRUS AVE
VIRGINIA ST
PEPPER WAY
SNOWDEN AVE
STATE ST
VERNA LN
COMMERCE ST
CORPORATE DR
ENTERPRISE DR
POST ST
MIDWAY ST
CITRUS
PLAZA
D
R
E HARDTST
KANSAS ST
LO
R
O
VERDE AVE
FURLOW DR
NEW JERSEY ST
COTTONWOOD RD
E WALLACE CT
K NI G SBURY DR
N CHURCH ST
M
RIAMONTE ST
B
RY N MAWRAVE
VAN LEUVEN ST
LANE ST
W CITRUS AVE
W PARK AVE
W STATE ST
CALIFORNIA ST
RESEARCH DR
MOUNTAIN GROVE
IOWA ST
NEW YORK ST
E 10 FRWY
SAN GORGONIO DR
E 10 FRWY
THE TERRACE
PLUM LN
E 210 TO 10 FRWY
TE
N
NES
SEE S
T
C
OLO
RA
D
O
S
T
E 10 FRWY E 10 FRWY
RIVER BLUFF AVE
E COOLEY AVE
E VICTORIA AVE
E RIVERVIEW DR
W 10 FRWY
W
10 TO 210 FRWY
W 10 FRWY
DOMESTIC AVE
W PIONEER AVE
LASHEAR TDR
MILL ST
INDUSTRIAL PARK AVE
E 210 FRWY
ALMOND AVE
W 210 FRWY
Redlands Regular Meeting 06-21-2022 904 of 1716
URGENCY ORDINANCE NO. 2934
AN URGENCY ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDLANDS PURSUANT TO GOVERNMENT CODE SECTION 65858 ADOPTING A TEMPORARY 45-DAY MORATORIUM ON NEW WAREHOUSE AND
DISTRIBUTION FACILITY DEVELOPMENT PROJECTS FOR PROPERTIES
LOCATED WITHIN THE COMMERCIAL AND INDUSTRIAL ZONING
DISTRICTS (TITLE 18 OF THE REDLANDS MUNICIPAL CODE) AND THE
COMMERCIAL AND INDUSTRIAL DISTRICTS OF SPECIFIC PLAN AREAS IN THE CITY OF REDLANDS.
THE CITY COUNCIL OF THE CITY OF REDLANDS DOES ORDAIN AS FOLLOWS:
Section 1. Purpose and Urgency Findings. In accordance with California Government Code section 65858, and in order to protect the public health, safety, and welfare, the City Council of the City of Redlands finds as follows:
A. The City of Redlands (“City”) is currently experiencing rapid and unabated construction of industrial development projects, specifically large warehouse and distribution facilities, some of which are proposed to be located near residential neighborhoods, as well as near numerous other properties that are now included in the City’s 2021-2029 Housing Element that have been identified to accommodate the City’s share of the Regional Housing Needs Assessment (“RHNA”). Large warehouse and distribution facilities can generate unique environmental impacts on surrounding properties and the larger community, including hundreds or thousands of trips by large trucks (including tractor-trailers) at all hours throughout the day and night, greenhouse gas emissions and air quality impacts associated with vehicle trips, noise impacts from on-site operations and off-site tractor-trailer trips on City streets, and other potential effects upon sensitive receptors such as residences, schools, daycare centers, and such other locations.
B. The City has the police power, pursuant to Article XI, section 7 of the California Constitution, to make and enforce ordinances to regulate the use of land within its jurisdictional boundaries, to the extent such regulations are not in conflict with the general laws of the State of California.
C. Government Code Section 65858 expressly authorizes the City Council, in order to protect public health, safety, and welfare, to adopt an interim urgency ordinance prohibiting a use that is in conflict with a contemplated general plan, specific plan, or zoning proposal that the legislative body, planning commission, or the planning department is considering or studying or intends to study within a reasonable time, provided that the urgency ordinance shall require a four-fifths (4/5) vote of the legislative body for adoption, and shall be of no further force and effect 45 days from its date of adoption, unless duly extended.
D. In light of the recent and rapid expansion of e-commerce and associated industrial development projects, including large warehouse and distribution facilities, the City Council Redlands Regular Meeting 06-21-2022 905 of 1716
finds that the following adverse public safety, health, and welfare impacts are of real concern:
i. Increased safety risk for smaller vehicles, pedestrians, and bicyclists; ii. Damage to City streets and property/facilities from collisions (reported and unreported), such as street lights, traffic signal equipment, signs, trees, curbs, medians, etc.;
iii. Traffic congestion and reduced levels of service on streets and at intersections; iv. Increased impacts from improperly over-loaded trucks; v. Deterioration in air quality, health, noise, vibration and increase in other disruptions to the peace and quiet necessary to the enjoyment of residential neighborhoods and efficacy of educational uses; and
E. Because of the actual and potential detrimental impacts of warehouse and distribution uses upon the City, which impacts may not be presently adequately addressed by the City’s current ordinances and zoning regulations, there is a need to impose a temporary moratorium on warehouse and distribution uses in order to study and develop policy guidance and potentially implement changes to the City’s zoning regulations.
F. Adoption of this urgency ordinance establishing an interim prohibition/ moratorium on land use approvals and building permits for new construction of warehouses and distribution facilities will allow the City sufficient time to study the land use and environmental impacts of such development projects, as well as allow for a deliberate approach to study and develop appropriate policies, development standards, and effective conditions of approval to mitigate the impacts of large warehouses and distribution facilities. The list below identifies some of the tasks that City staff will undertake during the moratorium:
i. Evaluate the operating characteristics of different types and sizes of warehouses and distribution facilities to better understand land use impacts, and develop appropriate policies, development standards, and/or operating conditions that can alleviate land use conflicts or impacts.
ii. Evaluate the City’s existing zoning districts that permit warehouse and distribution facilities, identify the proximity to existing sensitive receptors and residential zones, and identify appropriate development standards and/or operating conditions for warehouse/distribution facilities to buffer adjacent land uses (such as screening or landscaping, hours of operation, air quality mitigations or design features, intensity of use, number of large truck trips per day, designated routes for large trucks, etc.).
iii. Evaluate the City’s designated Truck Routes, and examine whether existing truck routes must be modified or improved to accommodate the volume and frequency of large truck trips (including roadway segments, intersections, traffic signals and signage, etc.), and ensure the best protection of the abutting or nearby residential neighborhoods and educational land uses.
iv. Evaluate the locations of existing points of origin and destination for large trucks, develop land use recommendations and preferences for locating large warehouses and distribution facilities, and examine the need for any changes to land use designations or zoning designations.
Redlands Regular Meeting 06-21-2022 906 of 1716
G. Accordingly, the City desires to establish, on an urgency basis, a temporary moratorium on certain types of new warehouse and distribution facility development projects within certain areas of the City through the adoption of this urgency ordinance, to further the purposes stated herein.
Section 2. Moratorium.
A. Based on the findings set forth herein for the immediate preservation of the public health, safety, and welfare, no land use approval or building permit may be issued for any new development projects for warehouse/distribution facilities that exceed 50,000 square feet of gross floor area and are situated on properties within the zoning districts and specific plan areas listed below for the effective period of this urgency ordinance; excepting therefrom any permits for additions, tenant improvements, repairs, maintenance, signs, and the like on existing permitted uses. Title 18 zoning districts and other Specific Plan areas subject to this moratorium shall include: Commercial Industrial (C-M) District; Industrial (I-P) District; Light Industrial (M-1) District; General Industrial (M-2) District; East Valley Corridor Specific Plan (all districts); Downtown Specific Plan (all districts); Specific Plan No. 25 (all districts); Concept Plan No. 1; Concept Plan No. 2; and excluding the fifteen properties identified as Assessor’s Parcel Numbers 0292-163-02-0000, 0292-163-03-0000, 0292-165-05-0000, 0292-165-06-0000, 0292-165-07- 0000, 0292-165-08-0000, 0292-165-09-0000, 0292-165-16-0000, 0292-165-17-0000, 0292-167- 02-0000, 0292-167-07-0000, 0292-167-28-0000, 0292-167-29-0000, 0292-167-30-0000, and 0292-201-20-0000 as listed in Exhibit “A” attached hereto.
B. Any projects which have received full entitlements, including all necessary CEQA approvals, for warehouse or distribution facility projects and have commenced substantial construction or incurred expenses in connection with such construction prior to the effective date of this urgency ordinance, and for which all applicable appeal periods have run, shall be considered exempt from application of this urgency ordinance.
Section 3. Immediate threat to health, safety, and welfare. Based on the findings herein, this urgency ordinance is adopted pursuant to California Government Code section 65858 to address a current and ongoing threat to the public health, safety, and welfare. The City Council has determined that granting land use approvals or building permits for new development projects for warehouse or distribution facilities on properties that exceed the abovedescribed square footage and are located within the above-described zoning districts and specific plan areas could result in an immediate threat to the public health, safety, and welfare.
Section 4. Written Report. Pursuant to Government Code Section 65858, staff must prepare for consideration and issuance by the City Council a written report describing measures taken to address the condition which led to the adoption of this urgency ordinance. The report will be provided to the City Council so that it may be considered and issued no later than ten (10) days prior to the expiration of this urgency ordinance.
Section 5. Effective Period. In accordance with California Government Code section 65858, this urgency ordinance shall be in full force and effect for a period of forty-five (45) days Redlands Regular Meeting 06-21-2022 907 of 1716
from the date of its adoption. This period may be extended by the City Council in accordance with the provisions of California Government Code section 65858.
Section 6. Conflicting Laws. For the term of this urgency ordinance, as set forth in Section 5 above, the provisions of this urgency ordinance shall govern over any conflicting provisions of any other City code, ordinance, resolution, or policy.
Section 7. Exempt from Environmental Review. The City Council has reviewed the matter and, based upon the facts and information contained in the staff report, administrative record, and written and oral testimony, hereby finds as follows:
A. Pursuant to Section 15378(b)(5) of the California Environmental Quality Act (“CEQA”), this urgency ordinance is an organizational or administrative activity of the City that will not result in direct or indirect physical changes in the environment, and therefore not a project. Additionally, pursuant to CEQA Guidelines Section 15061(b)(3), this urgency ordinance is exempt from CEQA review because there is no possibility that the moratorium may have a significant effect on the environment, insofar as it prohibits the construction of certain warehouse and distribution facilities within the City. Furthermore, even if the urgency ordinance is considered a project, the proposed moratorium is categorically exempt under CEQA Guidelines Section 15308, because it is clear that the moratorium will not create an environmental impact and the action will assure the maintenance, enhancement, or protection of the environment through the eventual adoption of regulations and development standards on such warehouse and distribution facilities. Accordingly, no further environmental review is necessary.
B. Further, as the urgency ordinance is an administrative procedure related to uses, facilities, and regulations, and given that the proposed urgency ordinance is not related to a specific project, the urgency ordinance (i) by virtue of the location of affected improvements, will not impact a sensitive environmental resource of hazardous or critical concern; (ii) will not have a cumulative impact on the environment through successive projects of the same type, in the same place, over time; (iii) does not have any unusual circumstances that will have a significant effect on the environment; (iv) does not impact a scenic highway; (v) is not located on a hazardous waste site; and (vi) will not adversely impact a historical resource. Accordingly, none of the exceptions to categorical exemptions set forth in the CEQA Guidelines, Section 15300.2, apply to this urgency ordinance.
Section 8. Enforcement. The City may enforce any provision of this urgency ordinance by mandamus, injunction, or any other appropriate civil remedy in any court of competent jurisdiction.
Section 9. Urgency Ordinance. This ordinance is an urgency ordinance and shall take effect and be enforced immediately upon adoption by a four-fifths (4/5) vote of the City Council.
Section 10. Severability. If any provision of this urgency ordinance or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of the urgency ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this urgency ordinance are severable.
Redlands Regular Meeting 06-21-2022 908 of 1716
The City Council hereby declares that it would have adopted this ordinance irrespective of the invalidity of any particular portion thereof. By enacting this urgency ordinance, the City ordains that nothing herein shall be deemed to conflict with or duplicate federal or state law, or otherwise or to license any activity that is prohibited thereunder except as mandated by such laws.
Section 11. Publication and Posting. The Mayor shall sign this urgency ordinance and the City Clerk shall certify to the adoption of this urgency ordinance and shall cause it, or a summary of it, to be published once in the Redlands Daily Facts, a newspaper of general circulation within the City, and thereafter, this ordinance shall take effect in accordance with law.
_________________________________
Paul T. Barich, Mayor
ATTEST:
_____________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 909 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing urgency ordinance was duly adopted by the City Council at a regular meeting thereof held on the 21st day of June, 2022.
AYES:
NOES:
ABSENT:
ABSTAINED:
___________________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 910 of 1716
EXHIBIT “A”
List and Map of Properties Excluded from this Urgency Ordinance Assessor’s Parcel Numbers:
0292-163-02-0000
0292-163-03-0000
0292-165-05-0000
0292-165-06-0000
0292-165-07-0000
0292-165-08-0000
0292-165-09-0000
0292-165-16-0000
0292-165-17-0000
0292-167-02-0000
0292-167-07-0000
0292-167-28-0000
0292-167-29-0000
0292-167-30-0000
0292-201-20-0000
[Map Attached]
Redlands Regular Meeting 06-21-2022 911 of 1716
CROCUS ST
IOWA ST
SUNFLOWER ST
HYACINTH AVE LUPINE ST
GOLDENROD AVE
SIRIANNI CT STORAGE CT
ORANGE AVE
HOWARD PL
NEVADA ST
AL ABAMA ST
CITRUS AVE STATE ST
029216507
029216509
029216730
029216505
029216508
029216517
029216702
029216729
029216707
029216506
029220120
029216303
029216302
029216728
029216516
0 250 500
Feet
Exhibit B:
May 25, 2022 O
Rezone Parcels
Parcels Parcels Exempt From Interim Prohibition/Moratorium on New Warehouses and Distribution Facilities
Redlands Regular Meeting 06-21-2022 912 of 1716
City Council Meeting K. 2.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of the University of Redlands requested Alternate Ballot Measure to the Redlanders for Responsible Growth Management Measure for the November 8, 2022 General
Municipal Election and determination that placement of the Measure is exempt pursuant to Section 15061(b)(3) of the California Environmental Quality Act Guidelines; Calling and Giving Notice of the Holding of a General Municipal Election and a Request to the Board of Supervisors of the County of San Bernardino to Consolidate Said Election with the Statewide Election on November 8, 2022 (Development Services Director Desatnik) MOTION(S):
If the City Council would like to put the alternate ballot measure on the November 2022 ballot, which was negotiated between the University of Redlands and RRGM leadership, and is supported by the University of Redlands, the following motion is provided:
I move to adopt Resolution No. 8317 to Submit to the Voters a Ballot Measure Proposing to Amend Sections 1.AO, 4.2B, 4.40s and 4.42m of the Principles of the Managed Development of the Redlands General Plan 2035; that placement of the Measure is exempt pursuant to Section 15061(b)(3) of the California Environmental Quality Act Guidelines; and Calling and Giving Notice of the Holding of a General Municipal Election and a Request to the Board of Supervisors of the County of San Bernardino to Consolidate Said Election with the Statewide Election on November 8, 2022.
RECOMMENDATION:
Hear the presentation from the University of Redlands on the alternate ballot measure and decide whether or not to approve placing the measure on the ballot for the November 2022 election as a City-initiated measure.
Redlands Regular Meeting 06-21-2022 913 of 1716
DISCUSSION:
At its meeting on August 3, 2021, the City Council adopted Resolution No. 8241 to submit the initiative ordinance prepared by Redlanders for Responsible Growth Management (the "RRGM Measure") for consideration by the voters at the regular municipal election of November 8, 2022 (Attachment A). The University of Redlands has negotiated with the original RRGM authors a substitute to the RRGM Measure (the "Alternative Measure") and is requesting that the City Council sponsor and approve placement of the Alternative Measure on the November 2022 ballot as a City-initiated measure. According to university representatives, the author of the RRGM Measure has agreed to withdraw the RRGM Measure from the ballot if the City Council approves placing the Alternative Measure on the ballot as a City-initiated measure. Attachment B is a copy of the Alternative Measure and Attachment C is the Alternative Measure with highlights in yellow showing changes made from the RRGM Measure.
The RRGM Measure contains a number of provisions that are not in compliance with State law based on the legal analysis obtained by the City (see discussion below). The Alternative Measure contains all the same provisions and, in addition, makes one modification to the RRGM Measure that, in staff’s opinion and based on the legal analysis, makes the Alternative Measure even less compliant with State law.
The University of Redlands believes that the Alternative Measure, if it were to pass, would allow for the University of Redlands' University Village project to proceed while the RRGM Measure would not. For this reason, the University has requested that the City Council sponsor and approve the placement of the Alternative Measure on the November ballot as a City-initiated measure.
Legal Analysis
RRGM Measure: A legal analysis of the RRGM Measure was prepared by the law firm of Devaney, Pate, Morris, & Cameron, LLP (the “DPMC Report) and presented to the City Council for the August 3, 2021 meeting. The DPMC Report (Attachment D) reviewed the RRGM Measure for general compliance with the state law governing procedural and substantive requirements for citizen-sponsored initiative measures, and specifically, the initiative's compliance with California SB 330, otherwise known as the Housing Crisis Act of 2019 (the “Housing Crisis Act”).
The Housing Crisis Act declared a statewide housing emergency to be in effect until January 2025. It was subsequently extended to 2030. Among other provisions, the Housing Crisis Act prohibits cities from enacting restrictions on new housing development, where housing is an allowable use, if the new restriction would do the following:
Change a General Plan land use designation to a less intensive use or reduce intensity of land use below what was allowed by the General Plan Redlands Regular Meeting 06-21-2022 914 of 1716
as of January 1, 2018. The definition of “less intensive use” under the Housing Crisis Act "includes, but is not limited to, reductions to height, density, or floor area ratio, new or increased open space or lot size requirements, new or increased setback requirements, minimum frontage requirements, or maximum lot coverage limitations, or anything that would lessen the intensity of housing."
Apply non-objective standards established on or after January 1, 2020.
Below are some of the more significant conclusions made by the DPMC report.
Section 1A.30(c) reduces the number of stories in the downtown Transit Village, thereby resulting in a reduction of permitted residential density and thus resulting in a violation of the Housing Crisis Act (see pages 6 and 8 of DPMC report).
1. Section 1A.30(e) also reduces the number of stories permitted, thereby resulting in a reduction of permitted residential density and thus resulting in a violation of the Housing Crisis Act (see pages 6 and 8 of DPMC report)
2. Section 1A.30(e) applies a “non-objective” standard by requiring written consent from owners of adjacent single-family residential properties, thus resulting in violations of the Housing Crisis Act (see page 9 of DPMC report).
3. Section 1A.30(f) increases the parking requirements for residential projects in the Transit Village areas, which have the effect of lessening the intensity of housing, thus resulting in a violation of the Housing Crisis Act (see page 9 of DPMC report).
4. Section 4.2B eliminates the “related to Metrolink stations” exemption and the exemption for projects located in the Downtown Specific Plan. This is also arguably a violation of the Housing Crisis Act (see pages 10 and 11 of DPMC report).
5. Section 4.40s changes the 4/5 vote requirement to a 5/5 vote requirement to rezone land that is designated as Urban Reserve (changed to Resource Preservation in the 2035 General Plan) in the General Plan or that was in agricultural production on November 3, 1986. By increasing the vote requirement a lesser intensity of could result, and thus this provision could be interpreted as a violation of the Housing Crisis Act ( see page 11 of DPMC report).
6. The same provisions addressed above in the DPMC report above were carried over and incorporated into the Alternative Measure and create similar concerns with the Housing Crisis Act.
Alternative Measure: The Alternative Measure added the provision below, which was not part of the RRGM Measure.
"All lands designated and/or zoned RESOURCE PRESERVATION in the City of Redlands 2035 GENERAL PLAN as adopted in 2017 shall conform to and meet the Rural Living standards as defined in Section 4.3, Land Use Classifications." This will significantly reduce the permitted residential density and, based on staff's review, is a violation of the Housing Crisis Act.
Redlands Regular Meeting 06-21-2022 915 of 1716
density and, based on staff's review, is a violation of the Housing Crisis Act.
Other Policy Issues
If the City Council approves the placement of the Alternative Measure on the ballot, all of its provisions will become part of the City's General Plan, including all of those detailed in the above legal analysis under the RRGM and Alternative Measures. As sponsor, these provisions will have been adopted in the City's name by a City-initiated ballot measure as the City Council will have voted affirmatively to put all of these provisions before the voters for approval, with the knowledge that the provisions contained in both the RRGM Measure and the Alternative Measures that are addressed in the DPMC opinion may be and, in some cases, are in violation of State law.
There are at least several items that will be before the City Council for approval over the next year that will be impacted by this ballot measure should it be placed on the ballot and approved by the voters. First is the Transit Villages Specific Plan (TVSP). The TVSP allows buildings, or portions of buildings, up to four stories in areas closest to all three transit stations. By reducing the height limit to three stories for the downtown Transit Village, the implementation of the TVSP, which relies on denser development in the core areas around the stations, will be severely jeopardized. Denser development envisioned by the TVSP is simply not feasible with a three-story height limit. The City received over $1 million in grant money from the State of California to prepare the TVSP and the associated Environmental Impact Report. These funds could potentially be jeopardized.
Second, the recently adopted Housing Element requires significant amounts of land to be rezoned for residential use in order to make sufficient land available to meet our share of the Regional Housing Needs Assessment (RHNA). Virtually all vacant land remaining in the City was in agricultural production as of November 3, 1986. Similar to the RRGM Measure, the Alternative Measure would require a five-fifths (5/5) of the City Council to approve the rezoning of land that was in agricultural production as of November 3, 1986.
As stated in the Legal Analysis above, the Alternative Measure will reduce the permitted residential density in the Resource Conservation land use area on the General Plan Land Use Map from one (1) dwelling unit per acre (on land with slope less that 15%) to one (1) dwelling unit per five (5) acres. There are a large number of property owners who own developable property in this area that will have residential development capacity, and thus corresponding property value, reduced by up to 80%.
Redlands Regular Meeting 06-21-2022 916 of 1716
CEQA
Should the City Council decide to place the Alternate Measure on the ballot, that decision is exempt from CEQA pursuant to State CEQA Guidelines, section 15061(b)(3) because there is no possibility that the ballot measure could lead to a direct or reasonably foreseeable indirect impact to the environment. The Alternative Measure further restricts residential development within the City beyond Measure U and a further limitation on development would not have an impact on the environment. A Notice of Exemption has been prepared and is attached to this staff report (Attachment E).
ALTERNATIVES:
Do not approve placing the Alternative Measure on the ballot.
STRATEGIC PLAN:
N/A
SUBMITTED BY:
Brian Desatnik, Development Services Director
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Brian Desatnik, Development Services Director
Fiscal Impact
Discussion:
N/A
Redlands Regular Meeting 06-21-2022 917 of 1716
Attachments
Attachment A: RRGM Measure
Attachment B: Alternative Measure
Attachment C: Alternative Measure showing changes
Attachment D: RRGM Measure Legal Analysis
Attachment E: Notice of Exemption
Attachment F: Resolution 8317
Redlands Regular Meeting 06-21-2022 918 of 1716
Redlands Regular Meeting 06-21-2022 919 of 1716
Redlands Regular Meeting 06-21-2022 920 of 1716
Redlands Regular Meeting 06-21-2022 921 of 1716
Redlands Regular Meeting 06-21-2022 922 of 1716
Redlands Regular Meeting 06-21-2022 923 of 1716
Redlands Regular Meeting 06-21-2022 924 of 1716
1 INITIATIVE ORDINANCE OF THE PEOPLE OF REDLANDS AMENDING SECTIONS 1A.0, 4.2B, 4.40s AND 4.42m OF THE PRINCIPLES OF MANAGED DEVELOPMENT OF THE CITY OF REDLANDS GENERAL PLAN 2035
WHEREAS, more than 40 years ago, in 1978, the voters of the City of Redlands approved Proposition "R," which established an ordinance enacting certain standards and procedures relating to managing growth within the City of Redlands; and WHEREAS, more than 30 years ago, in 1987, the voters of the City of Redlands approved Measure "N," which in relevant part enacted an ordinance which amended Proposition "R" to enhance the limitations established by Measure R and establish additional development standards within the City; and
WHEREAS, Measures R and N have been codified in the City of Redlands Municipal Code as Title 19, Growth Management; and
WHEREAS, in 1997 the voters of the City of Redlands approved the General Plan amendment commonly known as Measure "U" to assure consistency between the General Plan and growth management limitations and standards established by Measure R and N; and
WHEREAS, the provisions of Measure U have been fully incorporated in the City's current General Plan 2035 in its current form which was enacted on December 5, 2017 (“General Plan 2035”); and
WHEREAS, in order to assure that future development within the City of Redlands occurs in a way that is consistent with the established values and standards enacted by the people of Redlands that promote the social and economic well-being of the entire community, it is necessary to amend certain provisions of General Plan 2035 to:
a. Reduce costly urban sprawl and minimize future tax and utility rate increases while preventing the overcrowding of public school facilities, over-burdening public services such as police and fire, while providing adequate traffic circulation.
b. Preserve, protect and promote agricultural and open space uses c. Preserve the vitality and character of historic and older neighborhoods d. Preserve the vitality and character of the Historic Downtown - Packinghouse District as the primary source of City sales, business license and property tax revenues.
e. Ensure that sufficient developable land exists within the current City boundaries to meet projected housing needs, including housing for low and moderate income families, the handicapped and the elderly, while still preserving the City's quality of life.
Redlands Regular Meeting 06-21-2022 925 of 1716
2 NOW, THEREFORE, THE PEOPLE OF THE CITY OF REDLANDS DO ORDAIN AS FOLLOWS:
SECTION 1. GENERAL PLAN AMENDMENTS- The following provisions of the City's General Plan 2035, Sections 1A.0, 1A.10, 1.A.30, 4.2B, 4.40s and 4.42m, are hereby amended to read in their entirety as follows (deletions are shown by strikeout and additions are underlined):
a. AMENDMENT OF GENERAL PLAN 2035 SECTION 1A.0 PRINCIPLES OF
MANAGED DEVELOPMENT
1. 1A.10 PRINCIPLE ONE: The cost of infrastructure required to mitigate the effects of development shall be paid by that new development.
(a)Development fee policy - In accord with the provisions of California Government Code Sections 66000 et. seq., all development projects as defined therein shall be required to pay the development fees to cover 100% of their pro rata share of the cost of any public infrastructure, facilities or services, including without limitation police and fire services, necessitated as a result of such development. The City Council shall set and determine development fees sufficient to cover 100% of the estimated cost of such public infrastructure, facilities and services based on appropriate cost-benefit analyses as required by the provisions of California law.
(b)Socio-Economic Cost/benefit Study and Findings Required - Every development project proposal requiring a General Plan Amendment, Zoning Amendment, Subdivision Map, Specific Plan, Pre-Annexation Agreement for Outside City Utility Connections for non-contiguous properties, or for projects involving structures larger than 5,000 square feet, Conditional Use Permit approval, shall submit a socio-economic analysis and cost/benefit study, which shall also be included in all environmental documents submitted to the extent permitted by law, identifying the source of funding for necessary public infrastructure and reflecting the effect of such development on the City, as part of the application process. The City Council shall publish notice of and hold at least one public hearing at which the public may appear and be heard to consider the socio-economic cost/benefit study. Approval of the development project shall only occur if the socioeconomic study finds and determines to the satisfaction of the City Council that the development project 1) will not create unmitigated physical blight within the City or overburden public services, including without limitation the sufficiency of police and fire protection, and 2) the benefit of the development project to the City outweighs any direct cost to the City that may result. The City Council may, however, approve a development project for which the socio-economic study fails to make the required findings or determinations if the City Council finds and determines upon a 4/5 vote of its total authorized membership that the benefits to the City from the development project outweigh the negative socio-economic effects that may result.
Redlands Regular Meeting 06-21-2022 926 of 1716
3 1) For projects with a residential component, the Cost portion of the Cost/Benefit Study for that component shall be determined by dividing the city General Fund Expenditure Budget by the City Population and multiplying that quotient by the projected population of the project. (c) Impacts of New Development on Public Schools Shall Be Mitigated -A mandatory component of the socio-economic cost/benefit studies shall be an analysis of the effect of the proposed development on public schools facilities and resources, and shall include proposed measures to mitigate any identified adverse impacts on school facilities to the greatest extent permitted under California law.
(d) Exception - The provisions of Section 1A.10 shall not apply to any development, or portion thereof, that is located within the University Street Transit Village, funded by and/or subsidized by the federal, state, or local governments, and subject to a master development permit.
2. 1.A.30 PRINCIPLE THREE - Land use classifications set forth in the Redlands General Plan provide for an appropriate range of densities for residential development and intensity of commercial and industrial development in the City of Redlands.
(a) Number of Land Use Classifications and Density Standards Shall Not Be Increased - The density standards set forth in Paragraph 4.40, Residential Land Use Classifications, of Section 4.0, Land Use Element, of the Redlands General Plan shall not be increased, and no new residential land use classification except for the Transit Village Overlay Zone shall be added, without a vote of the people. (b) Prohibition of Transfers of Density - In order to assure that development occurs in a rational way, no transfer of residential development rights from lands other than those designated for single family residential shall be permitted, and then such transfers of single family residential density shall only be permitted to create or preserve agricultural, open space, school or park uses.
(c) Buildings in the Downtown Transit Village and the University Street Transit Village shall be limited to three (3) stories and a height of forty-three (43) feet from ground level to their highest point visible from the fronting street.
(1) Except: Those buildings that are located within ¼ mile of the transit station that is within the University Street Transit Village and that are subject to a master development plan shall be limited to four (4) stories and a height of sixty-eight (68) feet as measured from the ground level to their highest point visible from the fronting street.
Redlands Regular Meeting 06-21-2022 927 of 1716
4 (2) Except: No building more than two stories or (35) feet in height shall be permitted within an established and constructed single - family residential neighborhood.
(d) Buildings in the Alabama Street, California Street and New York Street Transit Villages shall be limited to four (4) stories and sixty-eight (68) feet in height as measured from the ground level to their highest point as viewed from the fronting street.
(e) No building more than two stories in height shall be permitted adjacent to a single-family dwelling absent written agreement of the dwelling owner(s); however, this section does not apply to properties across a public right of way.
(f) In multi-story structures with a residential living component in the five Transit Villages, parking for two or more bedroom units shall be two covered parking spaces and for one bedroom and studio units shall be one covered parking space. Every five units shall have one guest parking space.
Except: Parking for projects within ¼ mile of the transit station that is within the University Street Transit Village and that are subject to a master development permit shall be governed by a comprehensive parking management plan made part of the
master development permit that establishes all required parking spaces.
(g) Non-residential hotels are permitted and can be developed anywhere in the five Transit Villages, height and size determined by the City Council and are exempt from 1.A.30(c) and (d).
3. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.40s
No land undeveloped as of March 1, 1997 and designated in whole or in part as "Urban Reserve" or "Urban Reserve (Agriculture)" in the Redlands general plan in effect as of June 1, 1987, and/or any land parcel that was in active agricultural production on November 3, 1986 regardless of zoning shall be re-designated or rezoned to permit residential density greater than the Estate Residential (R-E) classification, as the same existed on June 1, 1987 in the Redlands City Zoning Ordinance unless the following mandatory findings are made and the re-designation or rezoning is approved by four-fifths (4/5) five fifths (5/5) vote of the total authorized membership of the City Council. Land designated by the General Plan as Urban Reserve as of June 1, 1987 shall not exceed a density greater than permitted by the R-E zone designation unless otherwise approved by a 4/5 vote of the City Council.
1. There are substantial and overriding economic and social benefits to the City and its residents and taxpayers from the proposed density increase.
2. The proposed density increase will not cause adverse environmental impacts, either individually or cumulatively, directly or indirectly.
Redlands Regular Meeting 06-21-2022 928 of 1716
5 3. The proposed density increase will not covert viable agricultural land to non-agricultural uses.
4. The proposed density increase will not have a growth inducing effect on other property.
5. The resulting use will be compatible with uses on adjacent land.
6. The proposed density increase will not require substantial expansion of public infrastructure, facilities or services.
4. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.42m
4.42m Density within all lands designated and/or zoned Resource Preservation in the City of Redlands 2035 GENERAL PLAN (Figure 4.5) adopted in 2017 shall be developed to the standards of the Rural Living classification as defined in Section 4.3 LAND USE, Land Use Classifications, Residential, Rural Living. the Southeast Area Plan shall be as follows:
Slope Acres/Dwelling Unit
0-15% 1.0 acre
>15-30% 2.5 acre
>30% 10.0 to 5.0 acres
b. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.2B
PRINCIPLES OF MANAGED DEVELOPMENT:
B. EXEMPTIONS
1. Vested projects. This initiative measure shall not apply to or affect any property on which a vested right has been legally perfected and acquired prior to the Effective Date pursuant to state law.
2.Special Categories of Development. The provisions of this initiative measure shall not apply to the following:
A. New individual infill construction of single family homes on existing lots of record bounded by developed property as of March 1, 1997 2020:
B. Rehabilitation, remodeling or additions to existing single family residential structures;
C. Reconstruction or replacement of any uses to the same density, intensity and classification of use as existed on the Effective Date, including non-conforming uses; D. Development directly related to the proposed Metrolink stations in the City of Redlands, including one at the University of Redlands;
E. New development projects subject to Downtown Specific Plan 45, upon a four-fifths (4/5ths) vote of the total authorized membership of the City Council; Redlands Regular Meeting 06-21-2022 929 of 1716
6 F. D. Special, temporary or occasional uses of public streets including parades local sporting and cultural events, graduation ceremonies, approved school activities and other occasional public gatherings.
SECTION 2. DEFINITIONS
a."Effective Date" shall mean the date on which this initiative measure was adopted by the City Council of the City of Redlands or on the date on which it was passed by the voters at the polls, whichever comes first. b.“Dwelling” and “dwelling units” shall be defined as any single family residence, apartment or dwelling unit in a multi-unit structure, or mobile home.
SECTION 3. EXEMPTIONS FOR CERTAIN PROJECTS
A. This measure shall apply to all properties and projects covered by its terms, except it shall not apply to any development project which has obtained a vested right as of the effective date of this measure. For purposes of this measure, a vested right shall have been obtained only and if each and all of the following criteria are met:
1. The proposed project has received a building permit or its final discretionary approval.
2. Substantial expenditures have been incurred in good faith reliance on the permit or final discretionary approval.
3. Substantial construction has been performed in good faith reliance on the permit or final discretionary approval.
B. The substantiality of expenditures incurred and of construction performed and the question of whether or not such expenditures and construction were in good faith are questions of fact to be determined on a case by case basis by the City Council following application by the developer and notice of a public hearing. Actions taken by the developer to speed up or expedite a development project with knowledge of the pendency of this measure shall not be deemed in good faith and shall not qualify for vested rights. Phased projects shall be considered for exemption on a phase by phase basis to the extent permitted by California law. For purposes of section 19.04.060 of this chapter, with regard to water and sewer connections outside the city, an applicant shall qualify for a vested right only if the foregoing criteria are met after the applicant has obtained a water and sewer connection, commitment, or both if both are required, from the City (4 of Measure N, passed by voters 11-3-1987: 17 of Proposition R, passed by voters 11-7- 1978).
Redlands Regular Meeting 06-21-2022 930 of 1716
7 C. This initiative measure is not intended and shall not be applied or construed to authorize the City to exercise its powers in a manner which will take private property for public use without payment of just compensation, but shall be interpreted, applied and implemented so as to accomplish its purposes to the maximum constitutionally permissible extent without requiring payment of compensation.
D. If application of this initiative measure to a specific property of record as of the Effective Date would create a taking then the City Council may, upon application by the landowner, allow additional density or uses on such property, upon findings that the level of additional development permitted is the minimum necessary to avoid a taking, and no lesser level of development would be sufficient to avoid a taking.
SECTION 4. SEVERABILITY
A. In interpreting this initiative measure or resolving ambiguity thereof, the City Council and all other city entities charged with implementing or enforcing this initiative measure or any part of it, as well as a reviewing court, shall interpret this initiative measure in the manner which most vigorously and effectively accomplishes its purposes and operative provisions.
B. If any portion of this initiative measure is hereafter determined to be invalid by a court of competent jurisdiction, all remaining portions of this initiative measure shall remain in full force and effect. Each section, subsection, sentence, phrase, part or portion of this initiative measure would have been adopted and passed irrespective of the fact that any one or more sections, subsections, sentences, phrases, parts or portions be declared invalid or unconstitutional.
SECTION 5. AMENDMENT AND REPEAL
This initiative measure and all of its provisions may be amended or repealed only by a majority vote of the electorate.
Redlands Regular Meeting 06-21-2022 931 of 1716
1 INITIATIVE ORDINANCE OF THE PEOPLE OF REDLANDS
AMENDING SECTIONS 1A.0, 4.2B, 4.40s AND 4.42m OF THE PRINCIPLES OF MANAGED DEVELOPMENT OF THE CITY OF REDLANDS GENERAL PLAN 2035 WHEREAS, more than 40 years ago, in 1978, the voters of the City of Redlands approved Proposition "R," which established an ordinance enacting certain standards and procedures relating to managing growth within the City of Redlands; and WHEREAS, more than 30 years ago, in 1987, the voters of the City of Redlands approved Measure "N," which in relevant part enacted an ordinance which amended Proposition "R" to enhance the limitations established by Measure R and establish additional development standards within the City; and
WHEREAS, Measures R and N have been codified in the City of Redlands Municipal Code as Title 19, Growth Management; and
WHEREAS, in 1997 the voters of the City of Redlands approved the General Plan amendment commonly known as Measure "U" to assure consistency between the General Plan and growth management limitations and standards established by Measure R and N; and
WHEREAS, the provisions of Measure U have been fully incorporated in the City's current General Plan 2035 in its current form which was enacted on December 5, 2017 ("General Plan 2035”); and
WHEREAS, in order to assure that future development within the City of Redlands occurs in a way that is consistent with the established values and standards enacted by the people of Redlands that promote the social and economic well-being of the entire community, it is necessary to amend certain provisions of General Plan 2035 to:
a. Reduce costly urban sprawl and minimize future tax and utility rate increases while preventing the overcrowding of public school facilities, over-burdening public services such as police and fire, while providing adequate traffic circulation.
b. Preserve, protect and promote agricultural and open space uses c. Preserve the vitality and character of historic and older neighborhoods d. Preserve the vitality and character of the Historic Downtown - Packinghouse District as the primary source of City sales, business license and property tax revenues.
e. Ensure that sufficient developable land exists within the current City boundaries to meet projected housing needs, including housing for low and moderate income families, the handicapped and the elderly, while still preserving the City's quality of life.
Redlands Regular Meeting 06-21-2022 932 of 1716
2 NOW, THEREFORE, THE PEOPLE OF THE CITY OF REDLANDS DO ORDAIN AS FOLLOWS:
SECTION 1. GENERAL PLAN AMENDMENTS- The following provisions of the City's General Plan 2035, Sections 1A.0, 1A.10, 1.A.30, 4.2B, 4.40s and 4.42m are hereby amended to read in their entirety as follows (deletions are shown by strikeout and additions are underlined):
a. AMENDMENT OF GENERAL PLAN 2035 SECTION 1A.0 PRINCIPLES OF
MANAGED DEVELOPMENT
1. 1A.10 PRINCIPLE ONE The cost of infrastructure required to mitigate the effects of development shall be paid by that new development. (a) Development fee policy. In accord with the provisions of California Government Code Sections 66000 et. seq., all development projects as defined therein shall be required to pay the development fees to cover 100% of their pro rata share of the cost of any public infrastructure, facilities or services, including without limitation police and fire services, necessitated as a result of such development. The City Council shall set and determine development fees sufficient to cover 100% of the estimated cost of such public infrastructure, facilities and services based on appropriate cost-benefit analyses as required by the provisions of California law.
(b) Socio-Economic Cost/benefit Study and Findings Required - Every development project proposal requiring a General Plan Amendment, Zoning Amendment, Subdivision Map, Specific Plan, Pre-Annexation Agreement for Outside City Utility Connections for non-contiguous properties, or for projects involving structures larger than 5,000 square feet, Conditional Use Permit approval, shall submit a socio-economic analysis and cost/benefit study, which shall also be included in all environmental documents submitted to the extent permitted by law, identifying the source of funding for necessary public infrastructure and reflecting the effect of such development on the City, as part of the application process. The City Council shall publish notice of and hold at least one public hearing at which the public may appear and be heard to consider the socio-economic cost/benefit study. Approval of the development project shall only occur if the socio-economic study finds and determines to the satisfaction of the City Council that the development project 1) will not create unmitigated physical blight within the City or overburden public services, including without limitation the sufficiency of police and fire protection, and 2) the benefit of the development project to the City outweighs any direct cost to the City that may result. The City Council may, however, approve a development project for which the socioeconomic study fails to make the required findings or determinations if the City Council finds and determines upon a 4/5 vote of its total authorized membership that the benefits to the City from the development project outweigh the negative socio-economic effects that may result.
Redlands Regular Meeting 06-21-2022 933 of 1716
3 1) For projects with a residential component the Cost portion of the Cost/Benefit Study for that component shall be determined by dividing the city General Fund Expenditure Budget by the City Population and multiplying that quotient by the projected population of the project. (c) Impacts of New Development on Public Schools Shall Be Mitigated. -A mandatory component of the socio-economic
cost/benefit studies shall be an analysis of the effect of the proposed development on public schools facilities and resources, and shall include proposed measures to mitigate any identified adverse impacts on school facilities to the greatest extent permitted under California law. (d) Exception: The provisions of Section 1A.10 shall not apply to any development, or portion thereof, that is located within the University Street Transit Village, funded by and/or subsidized by the federal, state, or local governments, and subject to a master development permit.
2. 1A.30 PRINCIPLE THREE - Land use classifications set forth in the Redlands General Plan provide for an appropriate range of densities for residential development and intensity of commercial and industrial development in the City of Redlands.
(a) Number of Land Use Classifications and Density Standards Shall Not Be Increased The density standards set forth in Paragraph 4.40 Residential Land Use Classifications, of Section 4.0 Land Use Element, of the Redlands General Plan shall not be increased, and no new residential land use classification except for the Transit Village Overlay Zone shall be added, without a vote of the people. (b) Prohibition of Transfers of Density -In order to assure that development occurs in a rational way, no transfer of residential development rights from lands other than those designated for single family residential shall be permitted, and then such transfers of single family residential density shall only be permitted to create or preserve agricultural, open space, school or park uses.
(c) Buildings in the Downtown Transit Village and the University of Redlands Street Transit Village shall be limited to three (3) stories and a height of forty (40) forty-three (43) feet from ground level to their highest point visible from the fronting street.
(1) Except: Those buildings that are located within ¼ mile of the transit station that is within the University Street Transit Village and that are subject to a master development plan shall be limited to four (4) stories and a height of sixty- eight (68) feet as measured from the ground level to their highest point visible from the fronting street.
Redlands Regular Meeting 06-21-2022 934 of 1716
4 (2) Except: No building more than two stories or (35) feet in height shall be permitted within an established and constructed single - family residential neighborhood.
(d) Buildings in the Alabama Street, California Street and New York Street Transit Villages shall be limited to four (4) stories and fifty-two (52) sixty-eight (68) feet in height as measured from the ground level to their highest point as viewed from the fronting street. (e) No building more than two stories in height shall be permitted adjacent to or contiguous with a single-family dwelling absent written agreement of the dwelling owner(s) on file with the City; however, this section does not apply to properties across a public right of way. (f) In multi-story structures with a residential living component in the five Transit Villages, parking for two or more bedroom units shall be two covered parking spaces and for one bedroom and studio units shall be one covered parking space. Every five units shall have one guest parking space.
Except: Parking for projects within ¼ mile of the transit station that is within the University Street Transit Village and that are subject to a master development permit shall be governed by a comprehensive parking management plan made part of the master development permit that establishes all required parking spaces.
(g) Non-residential hotels are permitted and can be developed anywhere in the five Transit Villages, height and size determined by the City Council and are exempt from 1.A.30( c) and (d).
3. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.40s
No land undeveloped as of March 1, 1997 and designated in whole or in part as "Urban Reserve" or "Urban Reserve (Agriculture)" in the Redlands general plan in effect as of June 1, 1987, and/or any land parcel that was in active agricultural production on November 3, 1986 regardless of zoning shall be re-designated or rezoned to permit residential density greater than the Estate Residential (R-E) classification, as the same existed on June 1, 1987 in the Redlands City Zoning Ordinance unless the following mandatory findings are made and the re-designation or rezoning is approved by four-fifths (4/5) five fifths (5/5) vote of the total authorized membership of the City Council. Land designated by the General Plan as Urban Reserve as of June 1, 1987 shall not exceed a density greater than permitted by the R-E zone designation unless otherwise approved by a 4/5 vote of the City Council.
1. There are substantial and overriding economic and social benefits to the City and its residents and taxpayers from the proposed density increase.
2. The proposed density increase will not cause adverse environmental impacts, either individually or cumulatively, directly or indirectly.
Redlands Regular Meeting 06-21-2022 935 of 1716
5 3. The proposed density increase will not covert viable agricultural land to non-agricultural uses.
4. The proposed density increase will not have a growth inducing effect on other property.
5. The resulting use will be compatible with uses on adjacent land.
6. The proposed density increase will not require substantial expansion of public infrastructure, facilities or services.
4. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.42m
4.42m Density within all lands designated and/or zoned Resource Preservation in the City of Redlands 2035 GENERAL PLAN (Figure 4.5) adopted in 2017 shall be developed to the standards of the Rural Living classification as defined in Section 4.3 LAND USE, Land Use Classifications, Residential, Rural Living. the Southeast Area Plan shall be as follows:
Slope Acres/Dwelling Unit
0-15% 1.0 acre
>15-30% 2.5 acre
>30% 10.0 to 5.0 acres
b. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.2B
PRINCIPLES OF MANAGED DEVELOPMENT:
B. EXEMPTIONS
1. Vested projects. This initiative measure shall not apply to or affect any property on which a vested right has been legally perfected and acquired prior to the Effective Date pursuant to state law.
2. Special Categories of Development. The provisions of this initiative measure shall not apply to the following:
A. New individual infill construction of single family homes on existing lots of record bounded by developed property as of March 1, 1997 2020:
B. Rehabilitation, remodeling or additions to existing single family residential structures;
C. Reconstruction or replacement of any uses to the same density, intensity and classification of use as existed on the Effective Date, including non-conforming uses; D. Development directly related to the proposed Metrolink stations in the City of Redlands, including one at the University of Redlands;
E. New development projects subject to Downtown Specific Plan 45, upon a four-fifths (4/5ths) vote of the total authorized membership of the City Council; Redlands Regular Meeting 06-21-2022 936 of 1716
6 F. D. Special, temporary or occasional uses of public streets including parades local sporting and cultural events, graduation ceremonies, approved school activities and other occasional public gatherings."
SECTION 2. DEFINITIONS
a. "Effective Date" shall mean the date on which this initiative measure was adopted by the City Council of the City of Redlands or on the date on which it was passed by the voters at the polls, whichever comes first. b. Dwelling and "dwelling units" shall be defined as any single family residence, apartment or dwelling unit In a multi-unit structure, or mobile home.
SECTION 3. EXEMPTIONS FOR CERTAIN PROJECTS
A. This measure shall apply to all properties and projects covered by its terms, except it shall not apply to any development project which has obtained a vested right as of the effective date of this measure. For purposes of this measure, a vested right shall have been obtained only and if each and all of the following criteria are met:
1. The proposed project has received a building permit or its final discretionary approval.
2. Substantial expenditures have been incurred in good faith reliance on the permit or final discretionary approval.
3. Substantial construction has been performed in good faith reliance on the permit or final discretionary approval.
B. The substantiality of expenditures incurred and of construction performed and the question of whether or not such expenditures and construction were in good faith are questions of fact to be determined on a case by case basis by the city council following application by the developer and notice of a public hearing. Actions taken by the developer to speed up or expedite a development project with knowledge of the pendency of this measure shall not be deemed in good faith and shall not qualify for vested rights. Phased projects shall be considered for exemption on a phase by phase basis to the extent permitted by California law. For purposes of section 19.04.060 of this chapter, with regard to water and sewer connections outside the city, an applicant shall qualify for a vested right only if the foregoing criteria are met after the applicant has obtained a water and sewer connection, commitment, or both if both are required, from the city (4 of Measure N, passed by voters 11-3-1987: 17 of Proposition R, passed by voters 11-7- 1978
C. This initiative measure is not intended and shall not be applied or construed to authorize the City to exercise its powers in a manner which will take private property for public use without payment of just compensation, but shall be Redlands Regular Meeting 06-21-2022 937 of 1716
7 interpreted, applied and implemented so as to accomplish its purposes to the maximum constitutionally permissible extent without requiring payment of compensation.
D. If application of this initiative measure to a specific property of record as of the Effective Date would create a taking then the City Council may, upon application by the landowner, allow additional density or uses on such property, upon findings that the level of additional development permitted is the minimum necessary to avoid a taking, and no lesser level of development would be sufficient to avoid a taking.
SECTION 4. SEVERABILITY
A. In interpreting this initiative measure or resolving ambiguity thereof, the City Council and all other city entities charged with implementing or enforcing this initiative measure or any part of it, as well as a reviewing court, shall interpret this initiative measure in the manner which most vigorously and effectively accomplishes its purposes and operative provisions.
B. If any portion of this initiative measure is hereafter determined to be invalid by a court of competent jurisdiction, all remaining portions of this initiative measure shall remain in full force and effect. Each section, subsection, sentence, phrase, part or portion of this Initiative measure would have been adopted and passed irrespective of the fact that any one or more sections, subsections, sentences, phrases, parts or portions be declared invalid or unconstitutional.SECTION 5. AMENDMENT AND REPEAL
This initiative measure and all of its provisions may be amended or repealed only by a majority vote of the electorate.
Redlands Regular Meeting 06-21-2022 938 of 1716
8 Redlands Regular Meeting 06-21-2022 939 of 1716
ELECTIONS CODE SECTION 9212
REPORT ON VOTER APPROVAL OF AN INITIATIVE ORDINANCE
OF THE PEOPLE OF REDLANDS
AMENDING THE PRINCIPLES OF MANAGED DEVELOPMENT
OF THE REDLANDS GENERAL PLAN
Presented August 3, 2021
Redlands City Council Meeting
Barry J. Schultz, Esq.
402 W. Broadway, Suite 1300
San Diego, CA 92101
Redlands Regular Meeting 06-21-2022 940 of 1716
1 Table of Contents
INTRODUCTION ............................................................................................................................................. 2 BACKGROUND AND SUMMARY OF INITIATIVE ............................................................................................. 2 A. Past Measures. .................................................................................................................................. 2 B. The Initiative. .................................................................................................................................... 3 SB 330 – Housing Crisis Act of 2019 .............................................................................................................. 3 ANALYSIS ....................................................................................................................................................... 5 Substantive Analysis of the Initiative ............................................................................................................ 6 Section 1.A10.B: .................................................................................................................................... 7 Section 1A.30(a) .................................................................................................................................... 7 Section 1A.30(c) and (d) ........................................................................................................................ 8 Section 1A.30(e) .................................................................................................................................... 9 Section 1A.30(f) ..................................................................................................................................... 9 General Plan 2035 Section 4.40s ................................................................................................................ 10 General Plan 2035 Section 4.2B .................................................................................................................. 10 Section 3. Exemptions for Certain Projects ................................................................................................ 11 Conclusions ................................................................................................................................................. 11
Redlands Regular Meeting 06-21-2022 941 of 1716
2 INTRODUCTION
On June 7, 2021, William E. Cunningham, representing Redlanders for Responsible Growth Management, filed with the Redlands City Clerk a petition for an initiative measure titled “An Initiative Ordinance of the People of Redlands Amending the Principles of Managed Development of the Redlands General Plan (“Initiative”). On July 6, 2021, the City Clerk certified the petition.
After an initiative measure has been certified, California Elections Code Section 9212 provides, before taking other specified actions, that the City Council may order a report on the effect of the proposed measure to address any of the following: fiscal impact; effect on the City’s general and specific plans, including the housing element and the consistency between planning and zoning; effect on land use, including the impact on availability and location of housing; infrastructure impact; impact on use of vacant parcels; and any other matters the Council requests to be in the report. The report must be presented to the City Council within 30 days after the City Clerk certifies to the City Council the sufficiency of the petition. (Elections Code Section 9212 (b)) After reviewing and considering the report, the City Council must either adopt the initiative measure without any amendments, or schedule a regular or special election for consideration of the initiative measure by the City’s voters at that meeting, or within 10 days thereafter.
Upon the City Clerk’s certification of the Initiative, the City Council of the City of Redlands took action calling for a report on the legal sufficiency of the Initiative. This report was prepared pursuant to the City Council’s request, and focuses on legal issues related to the Initiative’s compliance with the State law commonly referred to as Senate Bill No. 330 (Chapter 654; 2019), other relevant housing law, and general election law relating to initiative measures.
BACKGROUND AND SUMMARY OF INITIATIVE
A. Past Measures.
In 1978, the City’s voters approved Proposition R, a citizen sponsored initiative measure, and zoning ordinance, in response to rapid residential development1. Proposition R was subsequently amended in 1987 by the voters’ approval of the citizen sponsored initiative measure commonly known as Measure N.
Measure U, a third citizen sponsored initiative measure to manage growth, was approved by the voters in 1997, and amended the City’s General Plan to include “Principles of Managed Development,” and other growth management policies. These Principles and policies are fully incorporated in the City’s General Plan 2035.
Additionally, Measure U reduced the development density of San Timoteo and Live Oak Canyons, established a housing mix, and established traffic levels of service. Measure U also specifically exempted development directly related to rail stations, and development projects within the Downtown Specific Plan 45 from the growth management policies. An urban growth boundary was also established.
1 Measure R was adopted in 1978, followed by Measure N and Measure U. Measures R and N have been codified in the City of Redlands Municipal Code as Title 19, Growth Management.
Redlands Regular Meeting 06-21-2022 942 of 1716
3 B. The Initiative.
The Initiative purports to amend certain provisions of the City’s General Plan 2035 for the purpose of assuring that future development within the City of Redlands occurs in a way that is consistent with the values and standards enacted by the people of Redlands through the establishment of the City’s Growth Management System. Specifically, the Initiative amends Sections 1.A10, 1A.30, 4.2B and 4.40s of Measure U, and below is a summary of those amendments.
Sections 1.A10 and 1A.30 are included in Measure U’s Principles of Growth Management.
The Initiative amends Section 1.A10.B by modifying the Plan’s requirement for the preparation of a socio-economic analysis and cost benefit study to include a formula applicable to residential components of project for determining the cost portion of the cost benefit study.
Section 1A.30 sets forth limitations on land use classifications and density standards. The Initiative amends this section to provide for an exemption for the Transit Village Overlay Zone with respect to the vote requirement related to density increases. Additionally, the Initiative establishes new height limits and parking requirements applicable to the Transit Village areas.
Section 4.2B provides exemptions for certain categories of development from the Principles of Managed Development which were established by Measure U. The Initiative deletes the exemption for development related to the Metrolink stations and for new developments subject to the Downtown Specific Plan 45.
Section 4.40 of Measure U limits the re-designation or rezoning of lands previously designated as Urban Reserve or Urban Reserve (Agriculture), or in active agricultural production, as of 1986. The Initiative increases the Council’s vote requirement from 4/5th vote to a 5/5th vote requirement. Additionally, it deletes Measure U’s density limitation on land designated by the General Plan as Urban Reserve as of June 1, 1987.
In addition to amending the above referenced portions of the General Plan, Section 3 of the Initiative establishes exemptions for certain projects from the Initiative’s provisions. In summary, the exemptions apply to projects which have acquired vested rights in accordance with criteria established by the Initiative. It further states that actions taken by a developer to speed up or expedite a development project due to the pendency of this Initiative will not qualify for exemption from the Initiative’s provisions.
Finally, the Initiative requires that any interpretation of its provisions shall be done in a manner which most vigorously and effectively accomplishes its purpose and operative provisions.2
SB 330 – Housing Crisis Act of 2019
In enacting the Housing Crisis Act of 2019, (the “Act”), the Legislature declared that California is experiencing a housing supply crisis and the legislation enumerates the resulting harm to the State and its residents caused by the housing crisis. The Act specifically declared a statewide housing emergency to be in effect until January 2025.
The specific intent of the Act is to do both of the following:
2 Section 4A of the Initiative
Redlands Regular Meeting 06-21-2022 943 of 1716
4 (1) Suspend certain restrictions on the development of new housing during the period of the statewide emergency described in subdivisions (a) and (b). (2) Work with local governments to expedite the permitting of housing in regions suffering the worst housing shortages and highest rates of displacement.
For the purpose of this analysis of the Initiative and its compliance with SB 330, the substantive portions of the Act begin with Government Code Section 66300 and are summarized as follows:
The Act applies to any “affected city” and includes the electorate of an affected city exercising its local initiative power whether that power is derived from the California Constitution, statute, or the charter or ordinances of the affected city. The Act prohibits an “affected city” from enacting certain restrictions on new housing development on land where housing is an allowable use. A summary of the major restrictions of the Act are:
Changing a general plan land use designation to a less intensive use or reducing the intensity of land use below what was allowed by the governing general plan as of January 1, 2018. (Gov. Code section 66300, subd.(b)(1)(A))
A moratorium on housing development, with an exception for threats to health and safety. (Gov. Code section 66300, subd.(b)(1)(B))
Non-objective standards established on or after January 1, 2020. (Gov. Code section 66300, subd.(b)(1)(C))
Numerical limits on new housing. (Gov. Code section 66300, subd.(b)(1)(D)) The Act specifically states that any development policy, standard, or condition enacted on or after the effective date of section 66300, that does not comply with the Act’s requirements, shall be deemed void. (Gov. Code section 66300 (b)(2)).
The Act is intended to be construed so as to maximize the development of housing within the State, and any exception to the requirements of the Act, including an exception for the health and safety of occupants of a housing development, shall be construed narrowly.
However, the Act shall not be construed to void a height limit, urban growth boundary, or urban limit established by the electorate of an affected city, provided the height limit, urban growth boundary, or urban limit complies with the provisions relating to the reduction of intensity of land use. In other words, if any of the Initiative’s provisions (e.g., height limitations) do not result in a reduction of the intensity of use below what was allowed in the general plan as of January 1, 2018 it will not be prohibited by the Act.
Finally, Section 14 of the Act specifically declares that the provision of adequate housing, in light of the severe shortage of housing at all income levels in California, is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, the provisions of the Act apply to all cities, including charter cities.
Redlands Regular Meeting 06-21-2022 944 of 1716
5 ANALYSIS
Preliminary Matters
1. Does the Initiative Comply with the General Law Governing Initiative Measures? In addition to reviewing the Initiative for compliance with SB 330, the Initiative was also analyzed for consistency and compliance with the general law governing the procedural and substantive requirements for citizen sponsored initiative measures. Limitations on use of the initiative power can be established by the constitution (such as the single subject rule) or by case law (such as judicial decisions that initiatives are restricted to legislative acts and not adjudicatory acts). No deficiencies were found with respect to either type of limitation except to the extent the Initiative is preempted by SB 330 or other housing laws, as discussed herein. Specifically, the Initiative does not appear to run afoul of the single subject rule; the legislative act requirement; the requirement that initiatives be sufficiently certain (i.e. not so vague that it is unworkable); the prohibition on arbitrary or discriminatory measures, or the restriction on the exercise of powers reserved specifically to the City Council.
2. Is the City of Redlands an “affected city” under the Housing Crisis Act? The City of Redlands has been designated as an “affected city” by the Department of Housing and Community Development in accordance with Government Code section 66300(e). (See “Affected Cities” pdf dated 12/27/19, page 8, on HCD website.)
3. Does the Housing Crisis Act Preempt the Initiative?
In determining the issue of preemption, the courts utilize a four step process. First, a determination is made as to whether the city ordinance at issue regulates an activity that can be characterized as a ‘municipal affair.’ Here, the regulation of zoning through an initiative directed at changing the City’s General Plan is clearly a municipal affair. Second, there must be an actual conflict between local and state law. As discussed further in this analysis, the Initiative conflicts with the Act by its imposition of height restrictions, new parking regulations, and the imposition of third-party approvals of certain development proposals by adjacent landowners. Third, the state law must address a matter of ‘statewide concern.’ The legislature has specifically deemed the provision of adequate housing a matter of statewide concern. Finally, it must be determined that the law is ‘reasonably related to ... resolution’ of the statewide concern and is ‘narrowly tailored’ to avoid unnecessary interference in local governance. SB 330 is narrowly tailored to the type of land use restrictions which reduce or restrict the development of housing. Therefore, based on the application of this four part test, the Initiative is highly likely to be preempted by SB 330 because it imposes new land use restrictions beyond what was found in the City’s General Plan 2035, and those restrictions would have the effect of reducing the development of affordable housing opportunities.
4. Does the Initiative Conflict with the Purpose of The Housing Crisis Act? The Initiative amends certain provisions of the City’s General Plan 2035 for the purpose of assuring that future development within the City of Redlands occurs in a way that is consistent with the values and standards enacted by the people of Redlands through the establishment of the City’s Growth Management System. The principles of managed development and the associated policies established in the City’s General Plan 2035 by Measure U are by their very Redlands Regular Meeting 06-21-2022 945 of 1716
6 nature in conflict with the purpose and goals of the Act. The specific purposes of the Initiative are stated as follows:
a. Reduce costly urban sprawl and minimize future tax and utility rate increases while preventing overcrowding of public schools facilities, over-burdening public services such as police and fire, while providing adequate traffic circulation. b. Preserve, protect and promote agricultural and open space uses. c. Preserve the vitality and character of historic and older neighborhoods. d. Preserve the vitality and character of the Historic Downtown – Packinghouse District as the primary source of City sales, business license and property tax revenues. e. Ensure that sufficient developable land exists within the current City boundaries to meet projected housing needs, including housing for low and moderate income families, the handicapped and the elderly, while still preserving the City’s quality of life.
The overall gist of the Initiative’s purposes, consistent with the fundamental underlying principles of the City’s growth management policies, is to limit the development of new housing.
This is in direct conflict with the purpose of the Act’s goal of fostering new housing development by suspending restrictions on development of new housing.
Notwithstanding the conflict between the Initiative’s purpose and the purpose of the Act, the Act does not prohibit all growth management policies, development standards, and other local regulations. Specifically, the Act shall not be construed to void a height limit, urban growth boundary, or urban limit established by the electorate of an affected city, provided the height limit, urban growth boundary or urban limit complies with the provisions relating to the reduction of intensity of land use. Therefore, our analysis is confined as to whether any of the Initiative’s provisions are specifically prohibited by the Act. However, our analysis does take into account the Act’s intent that it be construed as to maximize the development of housing in the State.
Substantive Analysis of the Initiative
In analyzing whether any of the Initiative’s provisions are prohibited by the Act, the principal “prohibition” of the Act is set forth in Government Code section 66300(b)(1), which states:
Notwithstanding any other law except as provided in subdivision (i), with respect to land where housing is an allowable use, an affected county or city shall not enact a development policy, standard or condition that would have any of the following effects:
(A) Changing the general plan land use designation, specific plan land use designation, or zoning or parcels of property to a less intensive use or reducing the intensity of land use within an existing general plan land use designation or zoning district below what was allowed under the land use designation and zoning ordinances of the affected county or city, as applicable, as in effect on January 1, 2018…
For the purposes of this paragraph, “less intensive use” includes, but is not limited to, reductions in height, density, or floor area ratio, new or increased open space or lot size requirements, or new or increased setback requirements, minimum frontage requirements or maximum lot coverage limitations, or anything that would lessen the intensity of housing.
Redlands Regular Meeting 06-21-2022 946 of 1716
7 Section 1.A10.B:
Section 1.A10(b) of the General Plan’s principles of managed development requires the preparation of a socio-economic analysis and cost/benefit study of certain development proposals. The development proposal may not be approved unless there is a determination based on the study that the development will not create unmitigated physical blight within the City, or overburden public services, including without limitation, the sufficiency of police and fire protection, and a finding that the benefit of the development project to the City outweighs any direct cost to the City that may result.
The Initiative amends Section 1.A10(b) by modifying the Plan’s requirement for the preparation of a socio-economic analysis and cost benefit study to include a formula applicable to residential components of a project to determine the cost portion of the cost benefit study. The modification adds the following language to Section 1.A10(b):
1) For projects with a residential component, the Cost portion of the Cost/Benefit Study for that component shall be determined by dividing the City General Fund Expenditure Budget by the City Population and multiplying the quotient by the projected population of the project.
The modification singles out residential components of a project and presumably would not apply to commercial, industrial, or other non-residential components. On its face, while targeting new residential housing, the modification does not appear to have the effect of reducing the intensity of land use and would not be prohibited by the Act.
It should be noted, however, that the existing requirement of a socio/economic study may violate not only the Act’s requirement that only objective standards may be used to deny a project, but also the State’s Density Bonus law.
Section 1A.30(a)
This section restricts the designation of new residential land use classifications and increases in density without a vote of the people. Chapter 4.5 of the General Plan includes a Transit Village Strategy which includes the designation of a Transit Village Overlay Zone (“TVOZ”). There are five Transit Villages proposed as part of the Transit Village Strategy – California Street Transit Village, Alabama Street Transit Village, New York Street Transit Village, Downtown Redlands Transit Village and the University of Redlands Transit Village3.
The Initiative creates an exception to the restriction on new residential land use classifications and increases in density for properties within the TVOZ. While this section of the General Plan could be construed as a moratorium or similar restriction on housing development prohibited by the Housing Crisis Act4, the amendment proposed by the Initiative does not have the effect of reducing density or restricting housing development. In fact, it would eliminate a restriction on housing development within the TVOZ, and appears to be consistent with the City Council’s resolution passed in 2012 interpreting Measure U to permit the addition of the TVOZ land use designation to the City’s General Plan 2035.5
3 See Figure 4.7, Transit Village Concept, Redlands General Plan pg.4-33. 4 Government Code section 66300(b)(B)(1)
5 City Council Resolution No. 7173
Redlands Regular Meeting 06-21-2022 947 of 1716
8 Section 1A.30(c) and (d)
These sections are new additions to Section 1A.30 which establish height restrictions in the Transit Villages established in the General Plan. They are:
(c) Buildings in the Downtown Transit Village and the University of Redlands Transit Village shall be limited to three (3) stories and a height of forty (40) feet from ground level to their highest point visible from the fronting street. (d) Buildings in the Alabama Street, California Street and New York Street Villages shall be limited to four (4) stories and fifty-two feet in height as measured form [sic] the ground level to their highest point as viewed from the fronting street.
The Housing Crisis Act defines a “less intensive use” as including reductions to height6.
However, any reduction in intensity of use must be analyzed in comparison to the intensity of use (i.e. height restrictions) existing in the general plan land use designation or zoning ordinances in effect on January 1, 2018.
Chapter 4.5 of the General Plan contains the Transit Village Strategy which includes the designation of a Transit Village Overlay Zone. There are five Transit Villages proposed as part of the Transit Village Strategy – California Street Transit Village, Alabama Street Transit Village, New York Street Transit Village, Downtown Redlands Transit Village and the University of Redlands Transit Village. The Plan contemplates the development of a Transit Village Plan pursuant to the State of California’s Transit Village Development Plans Act. The proposed Transit Village Plan will supplement the General Plan’s Transit Village Strategy and include specific development standards applicable to the identified Transit Villages.
The General Plan contains a restriction on height for any proposed residential development in excess of 2 stories or greater than 35 feet in height. This restriction would apply to the Transit Villages. Any proposed development in excess of that standard may only be approved if certain mandatory findings are made and the project is approved by a 4/5th vote of the City Council. (Redlands General Plan, pg. 4-10)
For purposes of determining whether the height restrictions contained in the Initiative are prohibited by the Housing Crisis Act, the relevant comparison is with the General Plan’s height restriction. The Initiative would limit development to 3 stories and 40 feet for the Downtown Transit Village and the University of Redlands Transit Village, and 4 stories and 52 feet for the Alabama, California, and New York Street Transit Villages. The General Plan allows for height limits in excess of these height restrictions, subject to a discretionary approval (a super-majority vote of the City Council). The Initiative would preclude the additional height allowed under the General Plan within the Transit Village areas, and thus would result in a “less intensive use.” Based on this analysis, the Initiative’s height restrictions set forth in 1A.30(c) and (d) would be prohibited by SB 330.
A reasonable alternative analysis, could conclude that the General Plan’s height restriction is actually more restrictive than the Initiative. This analysis is based on the fact that the General Plan limits development in excess of 2 stories and 35 feet in height unless approved by the aforementioned discretionary process. The Initiative, by contrast, provides height limits in excess of 2 stories by right and these height limits are not subject to that discretionary process. Due to
6 Government Code section 66300(b)(1)(A)
Redlands Regular Meeting 06-21-2022 948 of 1716
9 the by-right nature of the Initiative, a reasonable conclusion would be that the Initiative results in “greater intensity of use” than currently allowed under the General Plan’s discretionary process.
Therefore, under this alternative analysis, this provision of the Initiative might not be prohibited by SB 330.
Section 1A.30(e)
This section is a new addition to the City’s General Plan 2035, and reads as follows:
(e) No building more than two stories in height shall be permitted adjacent to or contiguous with a single family dwelling absent written agreement of the dwelling owner(s) on file with the City.
As discussed above, the Housing Crisis Act considers a height restriction a less intensive use and prohibited if it is more restrictive than the existing height restrictions. In this case, again, the comparison is with the General Plan’s height restriction. The Initiative’s new requirement of obtaining approval of the adjacent property owner adds another layer of approval for any development which proposes a structure in excess of 2 stories. Therefore, this provision is prohibited by the Housing Crisis Act, as it constitutes a development policy which would have the effect of reducing the intensity of land use within an existing general plan land use designation below what was allowed under the land use designation in effect on January 1, 2018. The provision may also violate the Act’s prohibition against the denial of a residential development project based on the application of non-objective standards.
Section 1A.30(f)
This section is a new addition to the City’s General Plan 2035 and reads as follows:
(f) in multi-story structures with a residential living component in the five Transit Villages parking for two or more bedroom units shall be two covered parking spaces and for one bedroom and studio units one covered space. Every five units shall have one guest parking spaces.
The existing parking standards applicable to the Transit Villages are set forth in the Redlands Municipal Code. (Redlands Municipal Code section 18.164.090) The existing parking standards for multi-family dwellings are based on housing type and number of bedrooms. One bedroom units are required to provide one parking space, two bedroom units are required to provide 1.5 spaces and three bedroom units or more are required to two parking spaces. Additionally, all multi-family projects containing more than two units on a lot are required to provide one uncovered off-street parking space for every two units.
Parking standards are commonly known to constrain residential development. The Initiative’s new parking standards increase the number of parking spaces required for two bedroom units, require that all required parking be covered, and add a guest parking requirement. While the Housing Crisis Act does not specifically delineate parking requirements as constituting a less intense use, the Act does refer to “...anything that would lessen the intensity of housing...” (emphasis added). The Initiative’s additional parking requirements constitute an additional constraint on residential development and constitute a development policy which would lessen the intensity of development. Therefore, these additional parking requirements would be prohibited by the Housing Crisis Act.
Redlands Regular Meeting 06-21-2022 949 of 1716
10 In addition to conflicting with the Housing Crisis Act, the parking standards established by the Initiative would also conflict with the State’s density bonus law. The Density Bonus Law’s parking requirements are 1.5 spaces for units with two bedrooms or more. (Government Code section 65915(p)(1))
General Plan 2035 Section 4.40s
Section 4.40s is a Measure U policy which restricts the re-designation or re-zoning of land “designated in whole or in part as “Urban Reserve” or “Urban Reserve (Agriculture) in the Redlands General Plan in effect as of June 1, 1987, and/or any land parcel that was in active agricultural production…” as of November 1986, without making specific findings and requiring a 4/5th vote to approve the re-designation or rezoning.
The Initiative changes the vote requirement to 5/5th, and deletes the following language from Section 4.40s:
Land designated by the General Plan as Urban Reserve as of June 1, 1997 shall not exceed a density greater than permitted by the R-E zone designation unless otherwise approved by a 4/5th vote of the City Council.
The Housing Crisis Act prohibits development policies, standards, or conditions which would change a general plan land use designation to a less intensive use or reducing the intensity of land use below what is currently allowed under the general plan. Section 4.40s only applies where the affected property is to be re-designated or rezoned for a higher intensity of use. The Initiative modifies the current policy to require 5/5th vote to approve the higher density. While this may make approval of an increase in intensity of use more difficult, it does not in and of itself result in a less intensive use than is currently allowed. The language deleted from this section by the Initiative removes a limitation on density and does not result in a reduction of intensity of land use.
Therefore, neither of these provisions of the Initiative would be prohibited by the Initiative7.
However, the increased vote requirement could be reasonably argued to violate the spirit and intent of SB 330. A primary purpose of the Act is fostering new housing development by suspending restrictions on development of new housing. SB 330 prohibits anything that would lessen the intensity of use. In this case, greater intensity of use is allowed subject to a 4/5th vote.
By increasing the vote requirement a lesser intensity of use results. Under this interpretation the Initiative’s increase in the vote requirement would be prohibited by SB 330.
General Plan 2035 Section 4.2B
This section of Measure U provides for exemptions for certain categories of development from the Principles of Management Development that were established by Measure U. The Initiative deletes the exemption for:
D. Development directly related to the proposed Metrolink stations in the City of Redlands, including one at the University of Redlands.
7 The Housing Crisis Act also prohibits moratoriums or similar restrictions on housing development.
However, this section does not preclude housing development but limits the future intensity of development that can occur through a re-designation or rezone.
Redlands Regular Meeting 06-21-2022 950 of 1716
11 E. New development projects subject to Downtown Specific Plan 45, upon a four-fifth (4/5) of the total authorized membership of the City Council.
The purpose of the Principles of Managed Development established by Measure U is to limit growth. This purpose is expressed in Measure U as it states that compliance with the growth management principles will result in a reduction in the population of the City and the reduction in number of residential units to be developed in the City. (Section 4.2 Principles of Management Development, General Plan pg. 4-4) Exemptions from these managed development principles can be reasonably argued to allow for greater intensity of use than would be allowed if the principles of managed development were to apply to the subject areas. The removal of the exemptions for the Metrolink stations and the Downtown Specific Plan 45 would result in a decrease in intensity than what is currently allowed under the General Plan. Therefore, these provisions of the Initiative arguably are prohibited by the Housing Crisis Act.
Section 3. Exemptions for Certain Projects
This section of the Initiative establishes exemptions from the Initiatives for projects which have vested rights. The criteria set forth in the Initiative for establishing “vested rights” is substantially consistent with the criteria established by California law. (Avco Community Developers, Inc. v.
South Coast Regional Commission, 17 Cal. 3d 785,791 (1976)) However, in Section 3B the Initiative disqualifies a project from acquiring a “vested right” if the developer of a project takes actions to speed up or expedite a development project with knowledge of the pendency of this measure. This disqualification is not consistent with vesting rights as established by California law.
Additionally, the Initiative fails to include the vesting rights allowed by California law and the City of Redlands Municipal Code for development agreements and vested tentative maps. (Redlands Municipal Code sections 18.220 and 17.13)
Conclusions
As set forth in the above analysis, the following provisions of the Initiative may be prohibited by the Housing Crisis Act:
Sections 1A.30(c) and 1A.30(d), Section 1A.30(e), Section 1A.30(f) and Section 4.40s.
The Housing Crisis Act provides that any development policy, standard, or condition that does not comply with the Housing Crisis act is deemed void. Therefore, should the Initiative pass, these provisions would likely be deemed void if challenged.
The parking standards established by the Initiative in Section 1A.30(f) would also conflict with the State’s density bonus law.
Notwithstanding the Initiative’s exemption for “vested rights,” projects with Development Agreements or Vested Tentative Maps would also qualify for exemption from the Initiative’s enforceable provisions. Finally, it is highly unlikely that the Initiative’s attempt to disqualify from “vested rights” those projects which were expedited prior to the implementation of the Initiative, would be enforceable.
Redlands Regular Meeting 06-21-2022 951 of 1716
Notice of Exemption
To: Clerk of the Board of Supervisors From: City of Redlands County of San Bernardino Planning Division
385 North Arrowhead Avenue P.O. Box 3005
San Bernardino, CA. 92415-0130 Redlands, CA. 92373
Office of Planning & Research
P.O. Box 3044
Sacramento, CA. 95812-3044
Subject: Filing of Notice of Exemption in Compliance with Section 21152 of the Public Resources Code and CEQA Guidelines Sections 15061 & 15062.
Project Title: Alternate Ballot Measure to the Redlanders for Responsible Growth Management Measure for the November 2022 Election
Project Applicant: City Redlands
Project Location - Address: Citywide
Project Location - City: Redlands, California
Project Location - County: San Bernardino County
Project Description: On June 21, 2022, the Redlands City Council voted to place a an alternate ballot measure on the November 2022 ballot regarding the City’s Principles of Managed Growth in the General Plan. The alternate ballot measure has been proffered in lieu of the voter-initiated measure that the City Council voted to put on the November 2022 ballot last year. The City Council’s alternate ballot measure would, like the voter-initiated measure, amend the current growth management policy to remove the 4/5ths approval by the City Council; but, the City Council initiated alternate ballot measure would “not apply to any development, or portion thereof, that is located within, on or contiguous to the University Street Transit Village, of Redlands campus funded by and/or subsidized by the federal, and/or state, or local governments, and subject to a master development permit.” While the City Council initiated alternate ballot measure exempts the University Street Transit Village from the provisions of the voter-initiated measure, development in this area must still comply with the General Plan, master development permit, and/or zone district regulations. There is no increase in development potential from the existing growth management policies and therefore there is no potential for any significant environmental impact.
Name of Public Agency Approving Project: City of Redlands Name of Person or Agency Carrying Out Project: City of Redlands This is to advise that on June 21, 2022, the City Council of the City of Redlands approved the abovereferenced project, and made the following determination:
Exempt Status: (check one)
Redlands Regular Meeting 06-21-2022 952 of 1716
Ministerial (Sec. 21080(b)(1); 15268);
Declared Emergency (Sec. 21080(b)(3); 15269(a));
Emergency Project (Sec. 21080(b)(4); 15269(b)(c));
Categorical Exemption. State type and section number:
Statutory Exemptions. State type and section number:
Common Sense Exemption: 15061(b)(3)
Reasons why project is exempt:
The City Council initiated alternate ballot measure limits development beyond Measure U and is more restrictive than the existing growth control measures in the General Plan. The alternate ballot measure would exempt development associated with Redlands University from the provisions of the voter-initiated measure. As the alternate ballot measure is more restrictive than the existing growth control measures in the General Plan, and the development in the University Street Transit Village from the City Council must comply with CEQA and obtain a master development permit following the remainder of the existing growth management policies, there is no increase in development potential from the existing growth management policies and therefore there is no potential for any significant environmental impact.
Lead Agency: City of Redlands, Development Services Department Contact Person: Brian Desatnik, Development Services Director Telephone: (909)798-7555 (option 2)
This is to certify that the project documents and record of project approval are available to the general public and may be examined at the City of Redlands Development Services Department, Planning Division office, located at 35 Cajon Street, Suite 20, Redlands, CA 92373. The custodian of records is the City Planner, and may be contacted during regular business hours at (909) 798- 7555 extension 2.
_________________________
Brian Desatnik
Development Services Director
June 21, 2022
Signed by Lead Agency
Signed by Applicant
Redlands Regular Meeting 06-21-2022 953 of 1716
RESOLUTION NO. 8317
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS,
CALIFORNIA, CALLING AND GIVING NOTICE OF THE HOLDING OF A
GENERAL MUNICIPAL ELECTION TO BE HELD ON TUESDAY, NOVEMBER 8, 2022, FOR THE ELECTION OF CERTAIN OFFICERS, REQUESTING THE
BOARD OF SUPERVISORS OF THE COUNTY OF SAN BERNARDINO TO
CONSOLIDATE THE ELECTION WITH THE STATEWIDE GENERAL
ELECTION ON THE SAME DATE; AND FOR THE SUBMISSION OF A BALLOT MEASURE PROPOSING TO AMEND SECTIONS 1.AO, 4.2B, 4.40S AND 4.42M
OF THE PRINCIPLES OF MANAGED DEVELOPMENT OF THE REDLANDS GENERAL PLAN 2035.
WHEREAS, under the provisions of the laws relating to General Law cities in the State of California, a General Municipal Election may be held on Tuesday, November 8, 2022, for the election of Municipal Officers; and
WHEREAS, on August 3, 2021, the City Council of the City of Redlands adopted Resolution No. 8241, acknowledging receipt of a certified petition titled “An Initiative Ordinance submitted by the People of Redlands Amending Sections 1.AO, 4.2B, and 4.40s Principles of Managed Growth of the Redlands General Plan 2035” (the “Original Initiative”) and ordering the submission, without alteration, of the initiative ordinance to the qualified voters of the City at the City’s November 2022 regular municipal election to be held on November 8, 2022; and WHEREAS, the City Council of the City of Redlands has received a proposed alternative ballot measure negotiated by the University of Redlands with the authors of the Original Initiative titled "Initiative Ordinance of the People of Redlands Amending Sections 1.AO, 4.2B, 4.40s and
4.42m of the Principles of Managed Development of the Redlands General Plan 2035,” which the University of Redlands has requested be placed on the November ballot by this City Council; and WHEREAS, the University of Redlands has informed the City Council that the authors of the Original Initiative have agreed to withdraw their Original Initiative from the November ballot if this City council approves the alternative ballot measure; and WHEREAS, it is now desire of this City Council to place the alternative ballot measure on the November 2022 ballot;
NOW, THEREFORE, the City Council of the City of Redlands, California, does hereby resolve, declare, determine and order as follows:
Section 1. That pursuant to the requirements of the laws of the State of California relating to General Law cities within said State there is called and ordered to be held in the City of Redlands, California, on Tuesday, November 8, 2022, a General Municipal Election for the purpose of electing one Member of the City Council from District 1, one Member of the City Council from District 3 and one Member of the City Council from District 5, for the full term of four years.
Redlands Regular Meeting 06-21-2022 954 of 1716
Section 2. That the City Council submits the proposed ballot measure titled “An Initiative Ordinance of the People of Redlands Amending Sections 1.AO, 4.2B, 4.40s and 4.42m of the Principles of Managed Development of the Redlands General Plan 2035,” to the qualified voters of the City, and shall do so in the form of the following question:
Shall the Initiative Ordinance of the People of
Redlands Amending Sections 1.AO, 4.2B, 4.40s
and 4.42m of the Principles of Managed
Development of the Redlands General Plan 2035
be adopted?
Yes
No
Section 3. That the text of the ordinance submitted to the voters is attached hereto as Exhibit “A” and made a part thereof.
Section 4. That the ballots to be used at the election shall be in form and content as required by law.
Section 5. That the City Clerk of the City of Redlands is hereby authorized, instructed, and directed to procure and furnish any and all official ballots, notices, printed matter and all supplies, equipment and paraphernalia that may be necessary in order to properly and lawfully conduct said election.
Section 6. That the polls for said election shall be open at 7:00 A.M. of the day of said election and shall remain open continuously from said time until 8:00 P.M. of the same day when said polls shall be closed, except as provided in Section 14401 of the California Elections Code.
Section 7. That in all particulars not recited in this resolution, the election shall be held and conducted as provided by law for holding municipal elections.
Section 8. That notice of the time and place of holding of the election is given and the City Clerk is hereby authorized, instructed, and directed to give further or additional notice of the election, in time, form and manner as required by law.
Section 9. That the Board of Supervisors of said County is hereby requested to issue instructions to the Registrar of Voters of said County to take any and all steps necessary for the consolidation of the General Municipal Election with said County election.
Section 10. That the Registrar of Voters of said County is authorized to canvass the returns of the General Municipal Election and provide necessary services pertaining to the election to be held on Tuesday, November 8, 2022.
Section 11. That the City Council of the City of Redlands recognizes that additional costs will be incurred by the County by reason of this consolidation and agrees to reimburse the County for any such costs.
Redlands Regular Meeting 06-21-2022 955 of 1716
Section 12. That the City Clerk of the City of Redlands is hereby directed to file a certified copy of this resolution with the Board of Supervisors and the Registrar of Voters of the County of San Bernardino.
ADOPTED, SIGNED AND APPROVED this 21st day of June, 2022. _____________________________
ATTEST: Paul T. Barich, Mayor
________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 956 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting thereof held on the 21st day of June, 2022.
AYES:
NOES:
ABSENT:
ABSTAIN:
______________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 957 of 1716
June 22, 2022
Board of Supervisors
County of San Bernardino
County Civic Building
385 North Arrowhead Avenue
San Bernardino, California 92401
RE: ELECTION CONSOLIDATION
Enclosed is a certified copy of Resolution No. 8317 a resolution of the City Council of the City of Redlands, California, calling and giving notice of the holding of a General Municipal Election and requesting the Board of Supervisors of the County of San Bernardino to authorize the Registrar of Voters to canvass the returns and provide the necessary services pertaining to the election to be held on Tuesday, November 8, 2022.
In accordance with Section 9 of this resolution, we are requesting the Board of Supervisors to consent and agree to the consolidation of this general election.
Thank you in advance for your consideration.
Sincerely,
Jeanne Donaldson
City Clerk
JD:ms
Enclosure
xc: Registrar of Voters
Redlands Regular Meeting 06-21-2022 958 of 1716
EXHIBIT “A”
INITIATIVE ORDINANCE
Redlands Regular Meeting 06-21-2022 959 of 1716
INITIATIVE ORDINANCE OF THE PEOPLE OF REDLANDS AMENDING SECTIONS 1A.0, 4.2B, 4.40s AND 4.42m OF THE PRINCIPLES OF MANAGED DEVELOPMENT OF THE CITY OF REDLANDS GENERAL PLAN 2035
WHEREAS, more than 40 years ago, in 1978, the voters of the City of Redlands approved Proposition "R," which established an ordinance enacting certain standards and procedures relating to managing growth within the City of Redlands; and WHEREAS, more than 30 years ago, in 1987, the voters of the City of Redlands approved Measure "N," which in relevant part enacted an ordinance which amended Proposition "R" to enhance the limitations established by Measure R and establish additional development standards within the City; and
WHEREAS, Measures R and N have been codified in the City of Redlands Municipal Code as Title 19, Growth Management; and
WHEREAS, in 1997 the voters of the City of Redlands approved the General Plan amendment commonly known as Measure "U" to assure consistency between the General Plan and growth management limitations and standards established by Measure R and N; and
WHEREAS, the provisions of Measure U have been fully incorporated in the City's current General Plan 2035 in its current form which was enacted on December 5, 2017 (“General Plan 2035”); and
WHEREAS, in order to assure that future development within the City of Redlands occurs in a way that is consistent with the established values and standards enacted by the people of Redlands that promote the social and economic well-being of the entire community, it is necessary to amend certain provisions of General Plan 2035 to:
a. Reduce costly urban sprawl and minimize future tax and utility rate increases while preventing the overcrowding of public school facilities, over-burdening public services such as police and fire, while providing adequate traffic circulation.
b. Preserve, protect and promote agricultural and open space uses c. Preserve the vitality and character of historic and older neighborhoods d. Preserve the vitality and character of the Historic Downtown - Packinghouse District as the primary source of City sales, business license and property tax revenues.
e. Ensure that sufficient developable land exists within the current City boundaries to meet projected housing needs, including housing for low and moderate income families, the handicapped and the elderly, while still preserving the City's quality of life.
Redlands Regular Meeting 06-21-2022 960 of 1716
NOW, THEREFORE, THE PEOPLE OF THE CITY OF REDLANDS DO ORDAIN AS FOLLOWS:
SECTION 1. GENERAL PLAN AMENDMENTS- The following provisions of the City's General Plan 2035, Sections 1A.0, 1A.10, 1.A.30, 4.2B, 4.40s and 4.42m, are hereby amended to read in their entirety as follows (deletions are shown by strikeout and additions are underlined):
a. AMENDMENT OF GENERAL PLAN 2035 SECTION 1A.0 PRINCIPLES OF
MANAGED DEVELOPMENT
1. 1A.10 PRINCIPLE ONE: The cost of infrastructure required to mitigate the effects of development shall be paid by that new development.
(a)Development fee policy - In accord with the provisions of California Government Code Sections 66000 et. seq., all development projects as defined therein shall be required to pay the development fees to cover 100% of their pro rata share of the cost of any public infrastructure, facilities or services, including without limitation police and fire services, necessitated as a result of such development. The City Council shall set and determine development fees sufficient to cover 100% of the estimated cost of such public infrastructure, facilities and services based on appropriate cost-benefit analyses as required by the provisions of California law.
(b)Socio-Economic Cost/benefit Study and Findings Required - Every development project proposal requiring a General Plan Amendment, Zoning Amendment, Subdivision Map, Specific Plan, Pre-Annexation Agreement for Outside City Utility Connections for non-contiguous properties, or for projects involving structures larger than 5,000 square feet, Conditional Use Permit approval, shall submit a socio-economic analysis and cost/benefit study, which shall also be included in all environmental documents submitted to the extent permitted by law, identifying the source of funding for necessary public infrastructure and reflecting the effect of such development on the City, as part of the application process. The City Council shall publish notice of and hold at least one public hearing at which the public may appear and be heard to consider the socio-economic cost/benefit study. Approval of the development project shall only occur if the socioeconomic study finds and determines to the satisfaction of the City Council that the development project 1) will not create unmitigated physical blight within the City or overburden public services, including without limitation the sufficiency of police and fire protection, and 2) the benefit of the development project to the City outweighs any direct cost to the City that may result. The City Council may, however, approve a development project for which the socio-economic study fails to make the required findings or determinations if the City Council finds and determines upon a 4/5 vote of its total authorized membership that the benefits to the City from the development project outweigh the negative socio-economic effects that may result.
Redlands Regular Meeting 06-21-2022 961 of 1716
1) For projects with a residential component, the Cost portion of the Cost/Benefit Study for that component shall be determined by dividing the city General Fund Expenditure Budget by the City Population and multiplying that quotient by the projected population of the project. (c) Impacts of New Development on Public Schools Shall Be Mitigated -A mandatory component of the socio-economic cost/benefit studies shall be an analysis of the effect of the proposed development on public schools facilities and resources, and shall include proposed measures to mitigate any identified adverse impacts on school facilities to the greatest extent permitted under California law.
(d) Exception - The provisions of Section 1A.10 shall not apply to any development, or portion thereof, that is located within the University Street Transit Village, funded by and/or subsidized by the federal, state, or local governments, and subject to a master development permit.
2. 1.A.30 PRINCIPLE THREE - Land use classifications set forth in the Redlands General Plan provide for an appropriate range of densities for residential development and intensity of commercial and industrial development in the City of Redlands.
(a) Number of Land Use Classifications and Density Standards Shall Not Be Increased - The density standards set forth in Paragraph 4.40, Residential Land Use Classifications, of Section 4.0, Land Use Element, of the Redlands General Plan shall not be increased, and no new residential land use classification except for the Transit Village Overlay Zone shall be added, without a vote of the people. (b) Prohibition of Transfers of Density - In order to assure that development occurs in a rational way, no transfer of residential development rights from lands other than those designated for single family residential shall be permitted, and then such transfers of single family residential density shall only be permitted to create or preserve agricultural, open space, school or park uses.
(c) Buildings in the Downtown Transit Village and the University Street Transit Village shall be limited to three (3) stories and a height of forty-three (43) feet from ground level to their highest point visible from the fronting street.
(1) Except: Those buildings that are located within ¼ mile of the transit station that is within the University Street Transit Village and that are subject to a master development plan shall be limited to four (4) stories and a height of sixty-eight (68) feet as measured from the ground level to their highest point visible from the fronting street.
Redlands Regular Meeting 06-21-2022 962 of 1716
(2) Except: No building more than two stories or (35) feet in height shall be permitted within an established and constructed single - family residential neighborhood.
(d) Buildings in the Alabama Street, California Street and New York Street Transit Villages shall be limited to four (4) stories and sixty-eight (68) feet in height as measured from the ground level to their highest point as viewed from the fronting street.
(e) No building more than two stories in height shall be permitted adjacent to a single-family dwelling absent written agreement of the dwelling owner(s); however, this section does not apply to properties across a public right of way.
(f) In multi-story structures with a residential living component in the five Transit Villages, parking for two or more bedroom units shall be two covered parking spaces and for one bedroom and studio units shall be one covered parking space. Every five units shall have one guest parking space.
Except: Parking for projects within ¼ mile of the transit station that is within the University Street Transit Village and that are subject to a master development permit shall be governed by a comprehensive parking management plan made part of the
master development permit that establishes all required parking spaces.
(g) Non-residential hotels are permitted and can be developed anywhere in the five Transit Villages, height and size determined by the City Council and are exempt from 1.A.30(c) and (d).
3. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.40s
No land undeveloped as of March 1, 1997 and designated in whole or in part as "Urban Reserve" or "Urban Reserve (Agriculture)" in the Redlands general plan in effect as of June 1, 1987, and/or any land parcel that was in active agricultural production on November 3, 1986 regardless of zoning shall be re-designated or rezoned to permit residential density greater than the Estate Residential (R-E) classification, as the same existed on June 1, 1987 in the Redlands City Zoning Ordinance unless the following mandatory findings are made and the re-designation or rezoning is approved by four-fifths (4/5) five fifths (5/5) vote of the total authorized membership of the City Council. Land designated by the General Plan as Urban Reserve as of June 1, 1987 shall not exceed a density greater than permitted by the R-E zone designation unless otherwise approved by a 4/5 vote of the City Council.
1. There are substantial and overriding economic and social benefits to the City and its residents and taxpayers from the proposed density increase.
2. The proposed density increase will not cause adverse environmental impacts, either individually or cumulatively, directly or indirectly.
Redlands Regular Meeting 06-21-2022 963 of 1716
3. The proposed density increase will not covert viable agricultural land to non-agricultural uses.
4. The proposed density increase will not have a growth inducing effect on other property.
5. The resulting use will be compatible with uses on adjacent land.
6. The proposed density increase will not require substantial expansion of public infrastructure, facilities or services.
4. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.42m
4.42m Density within all lands designated and/or zoned Resource Preservation in the City of Redlands 2035 GENERAL PLAN (Figure 4.5) adopted in 2017 shall be developed to the standards of the Rural Living classification as defined in Section 4.3 LAND USE, Land Use Classifications, Residential, Rural Living. the Southeast Area Plan shall be as follows:
Slope Acres/Dwelling Unit
0-15% 1.0 acre
>15-30% 2.5 acre
>30% 10.0 to 5.0 acres
b. AMENDMENT OF GENERAL PLAN 2035 SECTION 4.2B
PRINCIPLES OF MANAGED DEVELOPMENT:
B. EXEMPTIONS
1. Vested projects. This initiative measure shall not apply to or affect any property on which a vested right has been legally perfected and acquired prior to the Effective Date pursuant to state law.
2.Special Categories of Development. The provisions of this initiative measure shall not apply to the following:
A. New individual infill construction of single family homes on existing lots of record bounded by developed property as of March 1, 1997 2020:
B. Rehabilitation, remodeling or additions to existing single family residential structures;
C. Reconstruction or replacement of any uses to the same density, intensity and classification of use as existed on the Effective Date, including non-conforming uses; D. Development directly related to the proposed Metrolink stations in the City of Redlands, including one at the University of Redlands;
E. New development projects subject to Downtown Specific Plan 45, upon a four-fifths (4/5ths) vote of the total authorized membership of the City Council; Redlands Regular Meeting 06-21-2022 964 of 1716
F. D. Special, temporary or occasional uses of public streets including parades local sporting and cultural events, graduation ceremonies, approved school activities and other occasional public gatherings.
SECTION 2. DEFINITIONS
a."Effective Date" shall mean the date on which this initiative measure was adopted by the City Council of the City of Redlands or on the date on which it was passed by the voters at the polls, whichever comes first. b.“Dwelling” and “dwelling units” shall be defined as any single family residence, apartment or dwelling unit in a multi-unit structure, or mobile home.
SECTION 3. EXEMPTIONS FOR CERTAIN PROJECTS
A. This measure shall apply to all properties and projects covered by its terms, except it shall not apply to any development project which has obtained a vested right as of the effective date of this measure. For purposes of this measure, a vested right shall have been obtained only and if each and all of the following criteria are met:
1. The proposed project has received a building permit or its final discretionary approval.
2. Substantial expenditures have been incurred in good faith reliance on the permit or final discretionary approval.
3. Substantial construction has been performed in good faith reliance on the permit or final discretionary approval.
B. The substantiality of expenditures incurred and of construction performed and the question of whether or not such expenditures and construction were in good faith are questions of fact to be determined on a case by case basis by the City Council following application by the developer and notice of a public hearing. Actions taken by the developer to speed up or expedite a development project with knowledge of the pendency of this measure shall not be deemed in good faith and shall not qualify for vested rights. Phased projects shall be considered for exemption on a phase by phase basis to the extent permitted by California law. For purposes of section 19.04.060 of this chapter, with regard to water and sewer connections outside the city, an applicant shall qualify for a vested right only if the foregoing criteria are met after the applicant has obtained a water and sewer connection, commitment, or both if both are required, from the City (4 of Measure N, passed by voters 11-3-1987: 17 of Proposition R, passed by voters 11-7- 1978).
Redlands Regular Meeting 06-21-2022 965 of 1716
C. This initiative measure is not intended and shall not be applied or construed to authorize the City to exercise its powers in a manner which will take private property for public use without payment of just compensation, but shall be interpreted, applied and implemented so as to accomplish its purposes to the maximum constitutionally permissible extent without requiring payment of compensation.
D. If application of this initiative measure to a specific property of record as of the Effective Date would create a taking then the City Council may, upon application by the landowner, allow additional density or uses on such property, upon findings that the level of additional development permitted is the minimum necessary to avoid a taking, and no lesser level of development would be sufficient to avoid a taking.
SECTION 4. SEVERABILITY
A. In interpreting this initiative measure or resolving ambiguity thereof, the City Council and all other city entities charged with implementing or enforcing this initiative measure or any part of it, as well as a reviewing court, shall interpret this initiative measure in the manner which most vigorously and effectively accomplishes its purposes and operative provisions.
B. If any portion of this initiative measure is hereafter determined to be invalid by a court of competent jurisdiction, all remaining portions of this initiative measure shall remain in full force and effect. Each section, subsection, sentence, phrase, part or portion of this initiative measure would have been adopted and passed irrespective of the fact that any one or more sections, subsections, sentences, phrases, parts or portions be declared invalid or unconstitutional.
SECTION 5. AMENDMENT AND REPEAL
This initiative measure and all of its provisions may be amended or repealed only by a majority vote of the electorate.
Redlands Regular Meeting 06-21-2022 966 of 1716
City Council Meeting K. 3.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of Resolution No. 8319 Setting Priorities for Filing of Written Arguments Regarding an Initiative Ordinance (City Clerk Donaldson)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
I move to approve Resolution No. 8319.
RECOMMENDATION:
It is recommended that the City Council approve Resolution No. 8319, a resolution of the City Council of the City of Redlands, California, setting priorities for the filing of written arguments regarding a proposed ballot measure, titled “Initiative Ordinance of the People of Redlands Amending Sections 1.AO, 4.2B,
4.40s and 4.42m Principles of Managed Development of the Redlands General Plan 2035.”
DISCUSSION:
Resolution No. 8319 is a resolution setting priorities for the filing of written arguments regarding a proposed ballot measure prepared by the University of Redlands titled, "Initiative Ordinance of the People of Redlands Amending Sections 1.AO, 4.2B, 4.40s and 4.42m Principles of Managed Development of the Redlands General Plan 2035,” and ordering the submission, of the ballot measure to the qualified voters of the City at the City’s November 8, 2022 regular municipal election.
The last day for receipt of primary arguments for or against the initiative ordinance, not exceeding 300 words, has been established at 5:00 P.M. on July 25, 2022 in the City Clerk's Office, Civic Center, 35 Cajon Street, Suite 4, Redlands Regular Meeting 06-21-2022 967 of 1716
Redlands, California. The last day for receipt of rebuttal arguments not exceeding 250 words has been established at 5:00 P.M. on July 29, 2022, in the City Clerk's Office, Civic Center, 35 Cajon Street, Suite 4, Redlands, California.
ALTERNATIVES:
The City Council may consider Resolution No. 8319 on July 5, 2022.
STRATEGIC PLAN:
Not Applicable
SUBMITTED BY:
Jeanne Donaldson, City Clerk
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
PREPARED BY:
Jeanne Donaldson, City Clerk
Fiscal Impact
Discussion:
There is no impact to the General Fund for setting priorities for filing a written argument, for or against, a voter initiative petition ordinance, scheduled to be on the November 8, 2022 ballot.
Attachments
Resolution No. 8319 Setting Priorities for Arguments
Redlands Regular Meeting 06-21-2022 968 of 1716
RESOLUTION NO. 8319
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS,
CALIFORNIA SETTING PRIORITIES FOR FILING A WRITTEN ARGUMENT
REGARDING AN INITIATIVE ORDINANCE
WHEREAS, a General Municipal Election is to be held on Tuesday, November 8, 2022 pursuant to Resolution No. 8317, adopted June 21, 2022; and WHEREAS, the City Council of the City of Redlands has approved Resolution No. 8317, acknowledging receipt of a proposed alternative ballot measure negotiated by the University of Redlands with the original authors of a similar initiative ordinance which alternative measure has been placed on the November ballot, titled “Initiative Ordinance of the People of Redlands Amending Sections 1.AO, 4.2B, 4.40s and 4.42m Principles of Managed Development of the Redlands General Plan 2035,” and ordering the submission of that alternative ballot measure to the qualified voters of the City at the City’s November 8, 2022 regular municipal election; NOW, THEREFORE, the City Council of the City of Redlands, California, does hereby resolve, declare, determine, and order as follows:
Section 1. That the last day for receipt of primary arguments for or against the initiative ordinance, not exceeding 300 words, has been established at 5:00 P.M. on July 25, 2022 in the City Clerk's Office, Civic Center, 35 Cajon Street, Suite 4, Redlands, California, and signed by each proponent and by each author, if different, of the argument in conformance with provisions of Section 9600 of the California Elections Code. Arguments may be changed or withdrawn by their proponents at any time prior to and including the final date fixed for filing arguments.
Section 2. That pursuant to Sections 9220 and 9285 of the California Elections Code, when the City Clerk has selected the arguments for and against the measure which will be printed and distributed to the voters, the City Clerk shall send copies of the argument in favor of the measure to the authors of the argument against, and copies of the argument against to the authors of the argument in favor. The authors may prepare and submit rebuttal arguments not exceeding 250 words. Rebuttal arguments shall be printed in the same manner as the direct arguments. Each rebuttal argument shall immediately follow the direct argument which it seeks to rebut.
Section 3. That the last day for receipt of rebuttal arguments not exceeding 250 words has been established as 5:00 P.M. on July 29 2022, in the City Clerk's Office, Civic Center, 35 Cajon Street, Suite 4, Redlands, California, and signed by each proponent and by each author, if different, of the rebuttal argument in conformance with the provisions of Section 9600 of the California Elections Code. Rebuttals may be changed or withdrawn by their proponents at any time prior to and including the final date fixed for filing rebuttals.
Section 4. That the City Council directs the City Clerk to transmit a copy of the measure to the City Attorney. The City Attorney shall prepare an impartial analysis of the measure showing the effect of the measure on the existing law and the operation of the measure. The impartial analysis shall be filed by the date set by the City Clerk for the filing of primary arguments.
Redlands Regular Meeting 06-21-2022 969 of 1716
ADOPTED, SIGNED AND APPROVED this 21st day of June, 2022 ______________________________
Paul T. Barich, Mayor
ATTEST:
_____________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 970 of 1716
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution No. 8319 was duly adopted by the City Council at a regular meeting thereof held on the 21st day of June, 2022, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
_________________________
Jeanne Donaldson, City Clerk
Redlands Regular Meeting 06-21-2022 971 of 1716
City Council Meeting K. 4.
DATE: 06/21/2022
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Professional Services Agreements for Property Tax and Sales Tax Consulting/Audit Services with Hdl Coren & Cone in a total amount not-to-exceed $59,925.00, for a period of three (3) years with two (2) one-year options to extend under similar terms, and the HdL Companies for a period of three (3) years with two (2) one-year options to extend under similar terms for sales, use and transaction tax consulting services in a total amount not-to-exceed $25,200, and an additional one-time fee of 15% of any new sales, transaction, and/or use tax revenue received by the City as a result of audit and recovery services performed (Management Services/Finance Director Garcia) MOTION(S):
I move to approve a professional services agreement for property tax consulting/audit services with HdL Coren & Cone in a total amount not-to-exceed $59,925.00, or $19,975.00 annually, for a period of three (3) years with two (2) one-year options to extend under similar terms.
1. I move to approve a professional services agreement with HdL Companies, for a period of three (3) years with two (2) one-year options to extend under similar terms for sales, use and transaction tax consulting services in a total amount not-to-exceed $25,200, or $8,400 annually, and an additional one-time fee of 15% of any new sales, transaction, and/or use tax revenue received by the City as a result of audit and recovery services performed.
2. RECOMMENDATION:
Staff recommends the City Council approve agreements with HdL Coren and Cone and HdL Companies for property tax and sales tax consulting/audit services. Staff is recommending single source procurement of these services based on the quality and extent of work previously performed by these contractors on behalf of the City, as well as their knowledge and expertise, and Redlands Regular Meeting 06-21-2022 972 of 1716
contractors on behalf of the City, as well as their knowledge and expertise, and extensive public agency client base.
DISCUSSION:
HdL Coren and Cone and HdL Companies provides audit and information services related to property taxes and has an extensive database consisting of more than 20 years of historical county property tax information. HdL Coren and Cone currently services 205 clients in California and offers a proprietary web-based software that provides access to monthly changes in ownership, deed recordings and other data affecting property tax levels.
Services provided by HdL Coren & Cone are detailed in 'Exhibit A' to the agreement and include:
Interactive estimates of property tax revenues that can be modeled on initial and refined assumptions
Successor Agency tax increment projections and cash flows Online access to property tax data, including the ability to geo-code areas for in-depth economic analysis and trending
Audits of secured and unsecured property tax rolls to ensure each is coded to the appropriate taxing entity
On-going consultative services, including on-call assistance with any property tax-related issues
HdL Coren and Cone proposes a monthly fee in line with previous charges for service of $18,250 annually for a period of three (3) years based on the number of parcels within City limits. This fee amount has remained unchanged since 2004. HdL Coren and Cone has extensive knowledge of the City's property tax base and their past performance has indicated high value and quality delivered to the City.
HdL Companies provides audit and consulting services for sales, use and transaction tax revenue. Through its sales tax audit efforts since 2012, it has recovered over $1.2 million in sales tax for the City. These recoveries are made possible through HdL's work detecting and documenting misallocations of sales and use tax activity within the time limitations set by the Board of Equalization.
HdL maintains the largest privately held sales tax database, containing 28 years of Redlands-specific data and has up-to-date knowledge of the City's tax base, including aspects related to the Citrus Plaza / Mountain Grove retail establishments.
Services provided by HdL are detailed in 'Exhibit A' to the agreement and include:
Identification of tax allocation errors and revenue maximizing opportunities Recovery of misallocated revenue
Quarterly sales tax reports, analytics, meetings
Redlands Regular Meeting 06-21-2022 973 of 1716
Online access to sales tax data, including the ability to geo-code business areas for in-depth economic analysis
Provision of detailed budget projections and monitoring for sales and use tax revenues
Preparation of legislative updates and support
HdL proposes a monthly fee of $700, $8,400.00 annually, for these services, and 15% of any new sales or use tax revenues received as a result of audit work performed on the City's behalf. The agreement is for a period of three (3) years and each year not-to-exceed $8,400.00. This amount does not reflect the one-time 15% fee on all new sales and use tax revenue received by the City as a result of audit and recovery work performed by HdL. These fees are not billed until any misallocated revenues are received by the City.
ALTERNATIVES:
The Council may reject the single source agreements with HdL and HdL Coren & Cone and direct staff to pursue procurement through a Request for Proposals process. However, there is only one other service provider for sales and/or property tax management and analysis, but they do not offer the array of services nor the access to past data that HdL and HdL Coren & Cone provide to the Cty.
STRATEGIC PLAN:
Not applicable.
SUBMITTED BY:
Danielle Garcia, Management Services/Finance Director
RECOMMENDED BY:
Charles M. Duggan, Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Redlands Regular Meeting 06-21-2022 974 of 1716
Fiscal Impact
Fiscal Year: 2023
Appropriation Required Y/N: No
Budgeted Y/N: Yes
Discussion:
Funding for the Professional Services Agreement for Sales, Use and Transactions Tax Audit and Information Services with Hinderliter, De Llamas and Associates (HdL) in the amount of $7,800 annually is included in the Departments' FY 2023 and 2024 Budget Request. Future year amounts will be included with subsequent budget requests.
Funding for the Professional Services Agreement for Property Tax Consulting/Auditing Services with HdL Coren & Cone in the amount of $18,250 is included in the Departments' FY 2023 and 2024 Budget Request.
Future year amounts will be included with subsequent budget requests.
Funding for recoveries of additional sales tax revenues are based on actual amounts received by the City and are limited to a one-time fee of 15% of the amount recovered.
Attachments
Property Tax Service Agreement
Sales Tax Service Agreement
Redlands Regular Meeting 06-21-2022 975 of 1716
AGREEMENT TO PERFORM PROFESSIONAL SERVICES
This agreement for the provision of property tax management, information and audit services (“Agreement”) is made and entered in this 21st day of June, 2022 (“Effective Date”), by and between the City of Redlands, a municipal corporation (“City”) and HdL Coren & Cone, a California corporation (“Consultant”). City and Consultant are sometimes individually referred to herein as a “Party” and, together, as the “Parties.” In consideration of the mutual promises contained herein, City and Consultant agree as follows:
ARTICLE 1 – ENGAGEMENT OF CONSULTANT
1.1 City hereby engages Consultant to provide property tax management information and audit services for City (the “Services”).
1.2 The Services shall be performed by Consultant in a professional manner, and Consultant represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional consultants in the industry providing like and similar types of Services.
ARTICLE 2 – SERVICES OF CONSULTANT
2.1 The Services that Consultant shall perform are more particularly described in Exhibit “A,” titled “Scope of Services,” which is attached hereto and incorporated herein by this reference.
2.2 Consultant shall comply with applicable federal, state and local laws and regulations in the performance of this Agreement including, but not limited to, any applicable State prevailing wage laws.
ARTICLE 3 – RESPONSIBILITIES OF CITY
3.1 City designates Danielle Garcia, Director of Management Services, as City’s representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City’s policies and decisions with respect to performance of the Services.
ARTICLE 4 – PERFORMANCE OF SERVICES
4.1 Consultant shall perform and complete the Services in a prompt and diligent manner.
4.2 The term of this Agreement shall be for a period of three (3) years from the Effective Date of this Agreement (the “Initial Term”). The City shall have the option to extend the Initial Term of this Agreement by two (2) additional one-year terms (each, an “Extended Term”), on the same terms and conditions, by providing written notice to Consultant at least thirty (30) days prior to the expiration of the Initial Term or any Extended Term.
Redlands Regular Meeting 06-21-2022 976 of 1716
4.3 If Consultant’s Services include deliverable electronic visual presentation materials, such materials shall be delivered in a form, and made available to City, consistent with City Council-adopted policy for the same. It shall be the obligation of Consultant to obtain a copy of such policy from City staff.
ARTICLE 5 – PAYMENTS TO CONSULTANT
5.1 The compensation for the Consultant’s performance of the Services will be the amount of fifty-nine thousand nine hundred twenty-five dollars ($59,925.00) for the Services provided during the Initial Term. Should this Agreement be extended, the compensation for Consultant’s performance for the Services will be the amount of nineteen thousand nine hundred seventy-five dollars ($19,975.00) for the first Extended Term; and nineteen thousand nine hundred seventy-five dollars ($19,975.00) for the second Extended Term, bringing the total possible amount of compensation to ninety nine thousand eight hundred seventy-five dollars ($99,875.00). For the Initial Term and each Extended Term, City shall pay Consultant on a time and materials basis in accordance with the rates specified in Exhibit “B,” titled “Fee Schedule,” which is attached hereto and incorporated herein by this reference
Consultant may adjust its Based Fix Fee pursuant to the California Consumer Price Index as set forth in Exhibit “B”. Fees for the identification and correction of errors are compensated on a contingent basis, Consultant shall receive 25 percent of general fund or tax increment property tax revenue or other revenues attributable to City recovered or reallocated as set forth in Exhibit “B”.
5.2 Consultant shall submit quarterly invoices to City describing the Services performed during the preceding month. Consultant’s invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom, and a description of reimbursable expenses related to the Services. City shall pay Consultant no later than thirty (30) days after receipt and approval by City of Consultant’s invoice.
5.3 Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:
CITY: CONSULTANT:
City Clerk HDL Coren & Cone
City of Redlands Paula Cone, President
35 Cajon Street 120 S. State College Boulevard
Redlands Regular Meeting 06-21-2022 977 of 1716
P.O. Box 3005 (mailing) Brea, CA 92821
Redlands, CA 92373 Phone: 714-879-5000
[email protected]
Phone: (909) 798-7531
ARTICLE 6 – INSURANCE AND INDEMNIFICATION
6.1 The following insurance coverage required by this Agreement shall be maintained by Consultant for the duration of its performance of the Services. Consultant shall not perform any Services unless and until the required insurance listed below is obtained by Consultant. Consultant shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City.