All striping, markings and raised pavement markers removed beyond the limits shown on the plans for and/or at the convenience of the Contractor shall be replaced at the Contractor’s expense.

300-1.3.2 (e) Structures. All existing concrete structures (reinforced or non -reinforced) as shown on the plans to be removed or abandoned, including but not limited to, undersidewalk drains, manholes, headwalls, bulkheads, drop inlet structures, energy dissipaters, catch basins, vaults and pipelines. Abandonment shall include all cuts and concrete plugs necessary to seal ends or openings of abandoned pipes or structures.

300-1.3.2 (f) Rock Curbs. All rock from rock curb removals, as shown on the plans or required for construction of the project, shall be transported, delivered and unloaded at a storage site as directed by the Engineer.

300-1.3.2 (g) Miscellaneous Removals. All other removals of facilities, as shown on the plans but not covered under separate bid items, and any underground facilities found during the work and not shown on the plans shall be performed. The City has endeavored to show all known underground f acilities but is not responsible for unknown or abandoned facilities. Unknown underground facilities shall be paid as extra work.

300-1.3.2 (h) Miscellaneous Relocations. All relocation work as shown on the plans or required for construction of the project, but not covered under separate bid items, shall be included as a part of Subsection 300-1 Clearing and Grubbing. All relocation work performed as a part of clearing and grubbing work shall conform to the requirements and specifications of the agency or utility having jurisdiction over the item to be relocated.

300-1.4 Payment. - Add the following sentence to paragraph 1:

Payment for work on this item shall be made as a percentage of the work completed at each monthly payment.

300-2 UNCLASSIFIED EXCAVATION.

300-2.2.2 Wet Material. - Amend the second sentence of the paragraph:

Redlands Regular Meeting of 09-17-24
665 of 790

GC 43

“If such high moisture content is not the result of any action on the part of the Contractor, or inaction in protecting the work during the course of the contract, the work involved will be paid for in the following manner: Over-excavation and disposal work shall be considered “extra work,” with backfill and compaction of crushed aggregate base paid under the appropriate bid item in these specifications.”

300-12 MISCELLAENOUS GRADING. The parkway, whether landscaping exists or not, shall be graded and compacted to achieve drainage towards the street at a slope of 2% . Grading shall be coordinated such that it is the last item of work to be completed, prior to site clean -up. Loose material and dirt shall be raked , compacted and distributed throughout the parkway area. Areas adjacent to installed improvements must be graded to a level within one inch from the finished surface. Extra dirt/fill shall be removed from the project in accordance with Specifications.

The Contractor, at his expense shall photo-document pre-construction conditions prior to starting excavating. After construction is completed, the Contractor shall photo -document the finished grade. The Contractor shall provide the City with said photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc). The Contractor shall keep a copy of the photos (either electronically or hard copy) and provide the City with electronic copies of the photos.

SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND

PLACEMENT OF BASE MATERIALS

301-1 SUBGRADE PREPARATION.

301-1.3 Relative Compaction. - Amend the second sentence of paragraph 1 as follows:
“When base material, curb, gutter, alley pavement, driveways, or sidewalks are to be placed on the subgrade material, the top 6 inches (150mm) of such subgrade material shall be compacted to a relative compaction of 95 percent.”

301-2.1 General. – Add the following paragraphs:

The contractor shall use ‘crushed aggregate base’ or ‘crushed miscellaneous base, fine graded’ as the base material. The use of ‘processed miscellaneous base,’ ‘select subbase,’ or ‘disintegrated granite’ shall not be used as base material.

The contractor may use ‘pulverized miscellaneous base’ (grindings) as part of the crushed base material. Said grindings shall be uncontaminated and placed in an even thickness as the lower course of crushed base material. Spreading and compacting shall comply with Sections 301 -2.2 and 301-2.3.

301-2.3 Compacting. – Amend the second sentence of paragraph 3 as follows:
“Compaction in the excepted areas shall be as specified in 211 -1 with each layer of compacted base material having a minimum relative compaction of 95 percent.” 301-2.4 Measurement and Payment. – Add the following paragraph:

Payment shall be made for cold -planing, storing, placing, and compacting reprocessed asphalt concrete pavement (grindings) as part of the crushed aggregate base (CAB) material. The volume Redlands Regular Meeting of 09-17-24
666 of 790

GC 44

of grindings placed shall be figured and a tonnage figure computed using 9.35 kg/m^3 (150 pounds per cubic foot). This tonnage figure shall be paid as par t of the crushed aggregate base tonnage for this project.

301-7 FULL DEPTH RECLAMATION WITH MECHANICAL STABILIZATION (FDR- 25)

301-7.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 25 ksi.

The manufacture of the recycled base course shall be done in -place by pulverizing and blending the existing AC layer and base materials, if present. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.

301-7.2 Construction . The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two -inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of roots, weeds, wood, and construction debris. All grass and other vegetation shall be removed from the edge of the exiting pavement or lip of gutter pan to prevent contamination of the pulverized bituminous material during the milling operation.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulveri zed pavement section to the lines and grades matching existing and/or per plans and specifications.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.

301-7.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout
Redlands Regular Meeting of 09-17-24
667 of 790

GC 45

Final subgrade surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized asphalt material must be used as base material to meet new cross slope requirements.

Native sub-grade material may need to be hauled off to allow for th e use of all pulverized base material. No additional compensation will be allowed for any sub -grade removal and haul -off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of mater ial, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.

301-7.4 Spreading, Mixing, and Compacting . Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture prior to shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

According to the Section 301 -2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of th e road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.

301-7.5 Finishing. The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.

301-8 FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION (FDR-200)

301-8.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 200 ksi.

The manufacture of the recycled base course shall be done in -place by pulverizing and blending the existing AC layer and base materials, if present , and adding cement . Micro-cracking of the completed cement stabilized surface is required before HMA is to be placed directly on top of the cement treated surface, regardless of the AC thickness. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.

Redlands Regular Meeting of 09-17-24
668 of 790

GC 46

The cement content must be 2% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 6” FDR section. The cement content must be 3% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 9” FDR section. The cement content must be 4% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 12” FDR section. Cement must be Type II or Type V Portland cement specified in ASTM C 150/150M.

301-8.2 Construction . The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two -inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of grass and vegetation, and construction debris to prevent contamination of the pulverized material s. Mixing shall continue until, and at the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials are achieved.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulveri zed pavement section to the lines and grades matching existing and/or per plans and specifications. Excess pulverized material shall consist of non-treated well mixed pulverized AC pavement and subgrade.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.

301-8.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout

Final pavement surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized material must be used as base material to meet new cross slope requirements. Native sub-grade material may need to be hauled off to allow for the use of all the pulverized base material. No additional compensation will be allowed for any sub -grade removal and haul -off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense . Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.

Redlands Regular Meeting of 09-17-24
669 of 790

GC 47

301-8.4 Spreading, Mixing, and Compacting . Do not use a heating device to soften the pavement. R emove any visible oversized materials in the pulverized roadbed mixture before shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

Recycling shall be performed to the depth provided in the plans, while incorporating stabilizing agents, mineral filler, additional aggregate and water. Mixing shall continue until, and the speed of the recycling unit adjusted to ensure, a homogenous mixtu re of the above materials and pulverized materials is achieved. Pre -cutting, grading and light compacting of the recycled material shall be performed prior to incorporation of the stabilizing. Spread cement uniformly over the full roadway surface width. Do not spread cement more than 30 minutes before mixing. Do not apply dry cement in windy conditions that will result in dust outside the FDR with cement area. The application rate must be the mix design rate or the ordered application rate in lb/sq yd ±

0.5 percent. The application rate of all stabilizing agents shall be continuously monitored. If the measured application rate falls outside the above tolerance, then the recycling operations shall be stopped and corrected before proceeding. Do not spread cement and aggregate before pulverizing.

Water must be injected through the pulverizing machine. The injection rate of mixing water must be sufficient to produce the FDR with cement material mixing moisture content. The water content of the stabilized material shall be monitored closely to ensure proper compaction. Mark where the center of the pulverizing drum stops. Start the following cut on this alignment at least 2 feet behind the mark. Before compacting, remove solids larger than 3 inches in any dimension by hand.

Immediately after pulverizing and mixing, compact FDR with cement to the minimum relative compaction. Do not allow more than 2 hours between final mixing of the pulverized material with cement and completion of initial compaction before trimming . During grading and final compaction add water to maintain the mixing moisture content as described in the mix design. Do not allow more than 2 hours to elapse from the time water is added to the aggregate and cement to completion of final compaction after trimming.

Longitudinal joints between adjacent stabilization passes shall be overlapped at least 4 inches.

Transverse joints between the recycling process shall be saw-cut, if necessary, to provide a vertical clean face to ensure proper compaction. Compaction of cem entitious stabilizer begins within 20 minutes after mixing and achieving gradation and moisture requirements.

According to the Section 301 -2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of th e road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.

Redlands Regular Meeting of 09-17-24
670 of 790

GC 48

Construction joints shall have vertical faces and shall be made in thoroughly compacted material.

Additional mixture shall not be placed against the construction joint until the joint has been approved by the Engineer. The face of the cut joint shall be lean and free of deleterious material and shall be kept moist until the placing of the adjacent FDR with cement.

301-8.5 Finishing. Once the entire working width (full lane width plus effected shoulder width) has been stabilized, and only after primary compaction has been completed, the entire working width shall be graded to the required profile and cross -slope. Disturbance to the stabilized and primary compacted material shall be kept to a minimum during this grading and shaping operation.

The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.

Immediately after compaction, apply water and roll with no vibration. The finished surface must be free of ruts, bump, indentations, segregation, raveling, and any loose material.

The completed cement treated subgrade shall be moist cured continuously until it is in a firm and unyielding condition. The cement treated subgrade shall be kept free from heavy traffic during the curing period or until the asphalt concrete surfacing is pl aced whichever is less, unless otherwise directed by the Engineer. Moisture curing shall be the only method of curing prior to micro - cracking.

Micro-cracking shall be performed with several vibratory roller passes 48 to 72 hours after finish grading to prevent severe, wide cracks from forming thus reduces the potential for reflective cracking through the HMA layer. Micro -cracking shall be perform ed before the application of asphaltic emulsion curing seal. After micro -cracking is complete additional moisture curing may be used. Any additional water required to achieve maximum density shall be applied by spraying the surface of the stabilized material with light applications. Care shall be taken so as not to over- apply additional water to any areas of the stabilized material.

While open to traffic and before placing HMA, maintain the FDR with cement surface free of ruts, bumps, indentations, raveling, and segregation. If FDR with cement material is damaged, it shall be repaired by removing and replacing the entire depth of affected layers in the damaged area.

Feathering will not be permitted for repair of low areas.

Asphaltic emulsion curing seal must be applied on the completed cement treated base immediately before placing HMA. Asphaltic emulsion curing seal must comply with Caltrans Standard Section 94, Grade SS1 or CSS1. Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic emulsion. The water must no cause premature separation of the emulsion. Uniformly apply the diluted curing seal at a rate of 0.1 gal/yd 2 of cement treated base surface.

Redlands Regular Meeting of 09-17-24
671 of 790

GC 49

SECTION 302 - ROADWAY SURFACING

302-4 SLURRY SEAL SURFACING.

302-4.3.1 General. – Add the following paragraphs:

All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or granular Aluminum Sulfate.

Prior to the beginning of slurry operations, the Contractor shall furnish, at no cost to the City, current licensed weigh master’s certificates indicating the net weight capacity of the aggregate bin.

The Contractor shall provide a drive upon scale at the project site or an alternate site approved by the City. The drive on scale shall show the net weight of the aggregate bin on each slurry machine before the machine and product will be approved for applying slurry on the project.

All slurry machines are to carry, at all times, a calibrated emulsion measuring stick. The emulsion measuring stick is to be calibrated in 10 -gallon increments to the slurry machine it is used on.

Emulsion measuring sticks from other slurry machines will not be allowed to measure the gallons of emulsions on the slurry machines they were not calibrated to. The emulsion measuring stick is to have the slurry machine number or identification permanently marked on the stick. The gallons of emulsion are to be measured with a calibrated emulsion measuring stick and recorded before leaving and after returning to materials site. Use of a slurry machine will not be allowed if it does not have a calibrated emulsion measuring stick.

The Contractor shall furnish prior commencing work, a calibrated stick in 10-gallon increments to measure the oil in the trailer storage tanks in gallons. The measuring stick shall be calibrated to the trailer storage tank it is used on. The inspector sh all check the oil in each load “in and out” and in the storage tanks at the beginning and end of each day to determine the amount of emulsion used for that day. Emulsion is not to be transferred from delivery tank to on -site storage tank before the City performs the sieve analysis on the emulsion. Aggregate used in the slurry shall not exceed a moisture content of four percent (4%) by weight of dry aggregate.

Contractor may not schedule more than 150 tons of slurry to be placed per day. Slurry may not be applied at more than 150 feet per minute.

The Contractor shall provide a self-propelled 10 ton pneumatic roller with a tire pressure of 50 PSI and equipped with a water spray system. The Contractor shall roll the required streets the same day they are slurried. The Contractor will be responsible for proper scheduling of the work s uch that the rolling can be properly done within the given time constraint. Failure to comply shall result in a $250.00/calendar day liquidated damage being assessed per incident. The cost of furnishing the roller and operator shall be included in the price paid for slurry seal.

The Contractor is hereby advised that City streets, parking lots, or other City -approved property will not be allowed as a site for stockpiling and batching. Arrangements for an acceptable site shall be the sole responsibility of the Contractor.

The Contractor shall sweep any raveled material on the street one (1) week after the initial placement. If the Engineer determines the raveling is excessive, the frequency of sweeping shall Redlands Regular Meeting of 09-17-24
672 of 790

GC 50

be adjusted to the field conditions of the raveling. If raveling continues within two (2) weeks of the initial placement, the street shall be swept and reslurried with a Type I mixtures (Local Streets) or a Type II (Arterial/Collector Streets) at no cost to the City. Raveling can be identified by the presence of “black pebbles” in the gutter.

The Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least fourteen (14) calendar days prior to slurr ying. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to slurrying. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for slurry seal.

Longitudinal joints must correspond with lane lines. You may request other longitudinal joint patterns if they do not adversely affect the slurry seal. Spread slurry seal in full lane widths. Do not overlap slurry seal between adjacent lanes more than 3 inches. Use a material, such as building paper at transverse joints and over previously placed slurry seal to prevent double placement.

Remove the material after use. Use hand tools to remove spillage.

Full compensation for developing a water supply, for furnishing and placing all water required for work done in the Contract, including extra work shall be included in the prices paid for the various items of work requiring water; and no separate payment w ill be made therefore. The Contractor shall supply the City with licensed weighmaster’s certificates of weight for all delivered aggregates to the job during the course of each day. Aggregate shall be delivered to the project only in the presence of a City representative. The Contractor shall also present weighmaster certificates for the amount of such aggregate remaining at the completion of the project at no cost to the City.

Payment shall be determined by the amount that is physically placed, which c annot exceed the amount that is delivered to the job site with the certified weighmaster tickets. There shall be not outside work done utilizing materials from the tanks or stockpiles stored for the City’s Contract.

Prior to storing aggregate on private property, the Contractor shall submit to the Engineer written permission from the property owner for such stockpiling.

Precautions shall be taken to ensure that stockpiles do not become contaminated with oversized rock, clay, silt, or excessive amounts of moisture. The stockpiles shall be kept in areas that drain readily. Segregation of the aggregate will not be permitted.

The Contactor shall protect the wet slurry from traffic at all times and if damaged or defaced, the Contractor shall repair said damage at no additional cost to the City.

The placement of slurry seal may be suspended with the concurrence of the Engineer due to unsuitable weather, temperature conditions, or other conditions that are considered unfavorable for the prosecution of the work. The Contractor shall immediately com ply with the order of suspension by the Engineer, and work shall not be resumed until authorized by the Engineer.

Redlands Regular Meeting of 09-17-24
673 of 790

GC 51

302-4.8 Spreading and Application. - Add the following paragraphs:

Prior to applying slurry seal, the Contractor shall clean, to the satisfaction of the Engineer, the street surface with a power sweeper, remove all R.P.M.’s, abrasive grind or sandblast completely all lane lines, street legends, crosswalks or other painted or thermoplastic surfaces. This is necessary to provide a good bonding surface for the slurry seal, as well as eliminate “ghosting” of the old striping and markings as the new slurry wears off over time.

It is anticipated that nuisance water, such as storm water runoff and irrigation water, will run in and across the right-of-way at various time throughout the period of construction. It shall be the responsibility of the Contractor, at their own expense, to provide for and protect the work from such water. In addition, the Contactor’s responsibility shall include handling nuisance waters such that their operations do not cause them to damage existing improvements or properties adjacent to or near the site of work.

Slurry shall not be applied when the atmospheric temperature is less than 65oF (18oC).

The application of slurry shall not commence until after 8:00 a.m., and shall conclude at 1:30 p.m. unless other authorized by the Engineer. The slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The portions of streets to be slurried shall be closed from the time the application begins until the mixture as achieved sufficient set to be opened to traffic.

The slurry shall be applied in such a manner that no ripples or waves exist. If ripples or waves occur in the slurry during the application, the work shall cease and the Contractor shall correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves are not corrected to the Engineer’s satisfaction, the street shall be reslurried at the Contractor’s expense.

The Contractor shall, at the direction of the Engineer, repair the reseal to the entire street, or complete section thereof, as determined by the Engineer, which have not been sealed properly (includes areas that have failed to meet yield and mix design specifications) and completely. No compensation will be provided for slurry seal used in repair and reseal work.

Each slurry crew shall be composed, at a minimum, of a coordinator at the project site at all times, a competent quick-set mixing man, a competent driver, two squeegee men, and sufficient laborers for any handiwork and cleanup.

Surface oil and grease shall be removed or sealed with shellac or an equivalent material approved by the City before the application of the slurry seal. Full compensation for surface oil and grease removal shall be considered as included in the unit cost for slurry seal.

The Contractor shall roll all cul-de-sacs (the last 250’ minimum), the last 250’ of dead-end streets and knuckle curves. Full compensation for rolling the slurry shall be considered as include in the unit cost for slurry seal.

During slurry seal operations, it shall be the Contractor’s responsibility to place protective covering over, or to otherwise avoid slurry seal coating of manholes, utility covers, pavement markers (reflective and non -reflective), concrete gutters, concret e cross gutters, and drainage Redlands Regular Meeting of 09-17-24
674 of 790

GC 52

facilities, survey monuments and remove said covering and/for slurry seal coating after slurry sealing has been completed.

The start and finish of slurry application shall be a straight line which, unless otherwise approved by the Engineer, shall be obtained by laying a strip of building paper or other material approved by the Engineer on the pavement surface. After applicati on of slurry, the paper is to be removed leaving a straight edge. The entire street surface area shall be sealed the same day.

302-4.8.1 Crack Sealing and Filling. Crack sealing shall be performed prior to the Slurry Seal application. Pavement cracks 1/4" wide and larger shall be sealed. Pavement cracks 1/8" to 1" wide shall be cleared of all loose particles of dust, dirt and laitance with oil -free compressed air immediately preceding the sealing operation. Cracks shall be routed out as necessary to provide a reservoir for the sealer that will have a depth of l" to 1 1/2".

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203 -6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or con crete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.

302-5 ASPHALT CONCRETE PAVEMENT.

302-5.1 General. - Add the following paragraphs:

Asphalt concrete pavement structural sections equal to or greater than 3 inches (76 mm) in thickness shall be installed in two lifts. Base course aggregate material size shall be ¾ inch (19 mm) and cap course aggregate material size shall be ½ inch (13 mm). All pavement shall be placed over 4 inches of crushed aggregate base, unless compacted to 95% relative compaction.

All valves within project limits in the public right -of-way shall be raised to finish grade as a part of this work. The Contractor shall furnish and install new can or slip can materials as necessary.

If new water valve lids are necessary, they shall be supplied by the Municipal Utilities and Redlands Regular Meeting of 09-17-24
675 of 790

GC 53

Engineering Department. All valve can lids within the project limits in the public right -of-way shall be painted the appropriate color for the utility they represent (ie. Water - Blue, Gas - Yellow, Fire – Red, etc.).

302-5.2 Timeline of Paving Operations.

All paving operations shall follow the timeline and requirements shown below unless otherwise approved by the City:

PAVING TIMELINE

DESCRIPTION OF WORK

TIME PERIOD
WEEK 1
(DAY 1-7)
WEEK 2
(DAY 8-14)
WEEK 3
(DAY 15-21)
WEEK 4
(DAY 22-28)
PAVING (START TO FINISH) (1)
CURE PERIOD (2)
MANHOLE ADJUST TO GRADE (3)
STRIPING & PAVEMENT MARKINGS (4)
TRAFFIC LOOPS (5)
NO PARKING SIGNS ALLOWED (6)
Note: All time periods shown above are the maximum amount of allowable time for each activity.

This timeline does not apply to the installation or repair of curb and gutter, ac dikes, sidewalks, cross gutters, curb ramps, driveway approaches or truncated domes.

(1) In no case shall any street segment remain unpaved longer than three calendar days if no other work activity is being performed on that street segment. Any deviation from the timeline shall result in a penalty assessment of $1,000 per calendar day. (2) No work except cat tracking of proposed striping is allowed during this period; therefore “No Parking Signs” shall not be installed during this activity. (3) Once each manhole is exposed, all associated work to adjust it to grade must be completed within 48 hours. This shall include all adjustments of manholes, vaults, valve cans, etc. as required by the Contract.
(4) All cat tracking and approval of proposed striping shall occur during the cure period. (5) Traffic loops must be installed after the approval of striping layout and prior to the installation of thermoplastic striping and pavement markings. (6) “No Parking Signs” shall be installed per Section 7-19 of these specifications.

302-5.4 Tack Coat. – Delete and replace with the following:

Redlands Regular Meeting of 09-17-24
676 of 790

GC 54

If the asphalt concrete pavement is being constructed directly upon an existing hard -surfaced pavement, a tack coat of High Performance Seal (HPS) No-Track Tack at an approximate rate of

0.05 gallon per square yard shall be uniformly applied upon the existing pavement preceding the placement of asphalt concrete. The surface shall be free of water, foreign material, or dust when the tack coat is applied. To minimize public inconvenience, no greater area shall be treated in any one day than is planned to be covered by asphalt concrete during the same day, unless otherwise approved by the Engineer.

302-5.5 Distribution and Spreading. – Add the following:

Unless otherwise permitted by the Engineer, the top layer of asphalt concrete for shoulders, tapers, transitions, road connections, private drives, curve widening, turnouts, left-turn pockets, and other such areas, shall not be spread before the top layer of asphalt concrete for the adjoining through lane has been spread and compacted. At locations where the number of lanes are changed, the top layer for the through lanes shall be paved first. Tracks or wheels of spreading equipment shall not be operated on the top layer of asphalt concrete in any area until final compaction has been completed or unless directed by the Engineer.

All screed extensions for paving machines shall be provided with a tamper, roller, or other suitable compacting devices.

Asphalt pavers shall be equipped with automatic screed controls and a sensing device or devices.

Automatic grade and slope control shall be used for overlays.

All joints shall be sealed after rolling.

When placing asphalt concrete to the lines and grades noted in the plans or as approved by the Engineer, the automatic screed controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor. The Contractor shall use a ski device, the minimum length of the ski device shall be 30 ft. The ski device shall be a rigid one -piece unit and the entire length shall be utilized in activating the sensor. The Contractor may use a laser to control the screed.

When placing the initial mat of asphalt concrete on existing pavement, the end of the screed nearest the center line shall be controlled by a sensor activated by a ski device not less than 30 ft long.

The end of the screed farthest from center line shall be controlled by an automatic transverse slope device set to reproduce the cross slope approved by the Engineer.

When paving contiguously with previously placed mats, the end of the screed adjacent to the previously placed mat shall be controlled by a sensor that responds to the grade of the previously placed mat and will reproduce the grade in the new mat within a 0.01 ft. tolerance. The end of the screed farthest from the previously placed mat shall be controlled in the same manner as when placing the initial mat.

Should the automatic screed controls fail to operate properly during any day's work, the Contractor may use manual control of the spreading equipment for the remainder of that day; however, the Redlands Regular Meeting of 09-17-24
677 of 790

GC 55

equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this section before starting the next day's work.

Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302 -

5.6.2 - Density and Smoothness, of the Standard Specifications, the paving operation shall be discontinued and the Contractor shall modify his equipment or furnish substitute equipment. A drop-off of more than 0.15 ft will not be allowed at anytime between adjacent lanes open to public traffic.

The Contractor shall schedule his paving operations such that each layer of asphalt concrete is placed on all contiguous lanes of a traveled way each work shift. At the end of each work shift, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 ft. nor less than 5 ft. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.

302-5.6.1 General. - Add the following paragraph:

All asphalt concrete pavement abutting portland cement concrete gutters shall match and be flush with the gutter lip when finish rolling is complete.

302-5.6.2 – Density and Smoothness. – Delete and replace with the following:

The completed surfacing shall be thoroughly compacted, smooth and free from ruts, humps, depressions or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete shall be eliminated by rolling or oth er means. The use of any equipment that leaves humps, ridges, irregularities or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.

The finished surface shall meet the following smoothness criteria:
• When a 12 foot long straightedge is laid on the finished surface parallel to the centerline of the roadway, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade,
• When a 12 foot long straightedge is laid on the finished surface perpendicular to the centerline of the roadway and extends from edge to edge of a traffic lane, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, exce pt at changes in grade.

If the top layer of pavement does not comply with the smoothness specifications shown, remove and replace the entire section or complete a grind and overlay of 1.5 inches or 3 times the aggregate size, whichever is greater. Grind and overlay will be considered as a repair method only when the thickness of the asphalt pavement section is greater than 1.5 inches following the required grinding. Corrected section shall be rectangular to the nearest pavement edge or lane line and to a crosswalk, concrete spandrel or other limits approved by the City. D o not begin corrective actions until the method and limit of correction is authorized by the City. If the tolerances cannot Redlands Regular Meeting of 09-17-24
678 of 790

GC 56

be achieved by the methods described above, the contractor must re -pave the street section, in kind, at their own expenses.

The compaction after rolling shall be a minimum of 91 percent and a maximum of 97 percent of the density obtained on samples compacted with the California Kneading Compactor per California Test 304. Cores will be taken randomly by the City for laboratory testing per California Test 308, Method A at a frequency of three per lot. A lot shall consist of a maximum of 3,000 square yards of asphalt concrete and will be identified in the field by the City . The cores will be averaged to determine the percent of maximum theoretical density, as determined by ASTM D - 2041, per lot to the nearest tenth of a percent.

Reduced payment factors for percent of maximum theoretical density will be per the following table, and will be applied to the entire lot sampled.

Reduced Payment Factors for Percent of Maximum Theoretical Density Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor
Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor

91.0 0.0000 97.0 0.0000

90.9 0.0125 97.1 0.0125

90.8 0.0250 97.2 0.0250

90.7 0.0375 97.3 0.0375

90.6 0.0500 97.4 0.0500

90.5 0.0625 97.5 0.0625

90.4 0.0750 97.6 0.0750

90.3 0.0875 97.7 0.0875

90.2 0.1000 97.8 0.1000

90.1 0.1125 97.9 0.1125

90.0 0.1250 98.0 0.1250

89.9 0.1375 98.1 0.1375

89.8 0.1500 98.2 0.1500

89.7 0.1625 98.3 0.1625

89.6 0.1750 98.4 0.1750

89.5 0.1875 98.5 0.1875

89.4 0.2000 98.6 0.2000

89.3 0.2125 98.7 0.2125

89.2 0.2250 98.8 0.2250

89.1 0.2375 98.9 0.2375

89.0 0.2500 99.0 0.2500
< 89.0 Remove and replace > 99.0 Remove and replace
In addition to the reduced payment factors below, all costs associated with the testing of the lot which resulted in values outside of the 91-97 percent range, will be withheld from the final payment due to the Contractor.

Following completion of the testing by the City, the core locations within the asphalt pavement shall be repaired by the Contractor.

Redlands Regular Meeting of 09-17-24
679 of 790

GC 57

302-5.6.3 Tracking. All areas receiving asphalt pavement shall be protected from tracking onto adjacent areas. Do not allow traffic on new asphalt pavement until its mid -depth temperature is below 140º Fahrenheit to minimize the tracking.

A rock dust blotter coat per Section 302-9.7 or a sand coat at a rate of 1-2 pounds per square yard shall be applied to the compacted surface for all areas where tracking is a concern. The application of tracking prevention measures shall be determined by the Contractor.

A haul route for all paving operations shall be reviewed and approved by the City prior to the start of any construction activity. No deviations from the approved haul route shall occur unless approved in writing from the City.

All tracking onto adjacent streets, striping or pavement markings shall be the responsibility of the Contractor. All striping and pavement markings shall be removed and replaced in kind by sandblasting. All tracking onto roadway surfaces may require the use of a street sweeper to the satisfaction of the City.

302-5.7 Joints. – Add the following:

Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such condition that the quality of the completed joint will be affected. Longitudinal and transverse joints shall be tested with a 12’ straightedge and shall be cut back as required to conform to the provisions in Subsection 302-5.6.2 Density and Smoothness for surface smoothness. Connections to existing surfacing shall be feathered to conform to the provisions for smoothness.

Longitudinal joints in the top layer shall correspond with the edges of proposed lane striping.

Longitudinal joints in all other layers shall be offset not less than 0.5' alternately each side of the edges of traffic lanes.

All feathered joints shall be sealed after rolling.

302-5.9 Measurement and Payment. – Add the following:

Reduced payment factors per 302 -5.6.2 will be applied to the Contract Unit Price for lots with a Maximum Theoretical Density less than 91.0 and greater than 97.0 percent.

302-5.10 Hot Asphalt Leveling Course. Areas to receive the Hot Asphalt Concrete Leveling Course shall be determined and defined by the project manager and inspector, and identified to the Contractor in the field. Mix for hot Asphalt Concrete Leveling Course shall be 1/2 inch aggregate, C2, as defined in Section 203-6.4.3.

Areas to receive hot asphalt concrete leveling course shall be areas located near or adjacent to existing curbs and/or gutters that are potholed, or have the lip of gutter higher than the adjacent roadway. Potholes, large cracks, or ruts shall be filled t o the surrounding grade elevation and compacted. Hot Asphalt Concrete Leveling Course shall be completed prior to the placement of Type II Slurry Seal, ARAM or resurfacing.

Redlands Regular Meeting of 09-17-24
680 of 790

GC 58

Prior to placement of asphalt concrete, the surface shall be cleaned and all debris and deleterious materials shall be removed. A tack coat meeting the material and application requirements of Section 302-5.4 Tack Coat, shall be applied prior to placement of hot mix asphalt concrete.

302-5.11 Asphalt Pavement Crack Sealing and Filling. Crack sealing shall only be performed as a repair method for conventional hot mix asphalt pavement (HMA) and not installed at project locations which will have asphalt rubber hot mix (ARHM) used as the overlay material. Crack sealing shall be performed after milling of existing asphalt surface and prior to any leveling course, if necessary.

Right after milling of existing asphalt and before crack sealing or filling, Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least seven (7) calendar days prior to paving. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to paving. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for paving.

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203 -6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or con crete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.

SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION

303-1 CONCRETE STRUCTURES.

303-1.1 General. - Delete the first sentence of paragraph 1 and replace with the following:
“Concrete bridges, culverts, catch basins, retaining walls, abutments, piers, footings, foundations, drainage inlets, head walls, end walls, wing walls, junction structures, transition structures, Redlands Regular Meeting of 09-17-24
681 of 790

GC 59

manholes, and other similar types of portland cement concrete structures shall be constructed to the lines and grades in conformity with the Plans and Specifications.

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.

303-5.1.1 General. - Replace the last paragraph with the following:

No PCC shall be ordered and/or placed until the forms and subgrade have been inspected and approved by the Engineer in the field.

All pull boxes, water meter boxes, and water valve covers shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the PCC.

The Contractor shall barricade and protect placed PCC from all damage, marks, mars, and/or graffiti. Any PCC damaged, defaced, discolored, or defective shall be replaced at the Contractor's expense.

When removals of curb and/or sidewalk are located at curb return, the Contractor shall install access ramps. The Contractor is to construct all access ramps in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. If the ramps constructed by the Contrac tor are found to be in non -compliance with ADA Standards, the Contractor will be required to remove and replace the ramps to ADA Standards at the Contractor's expense.

303-5.1.2 Drainage Outlets Through Curb. - Add the following paragraph:

Coring shall be required for all drains through existing curbs.

303-5.1.3 Driveway Entrances. – Replace the last paragraph with the following:

Driveway approaches where required, shall be 150 mm (6") thick for single-family residential area, and 200 mm (8") thick for commercial driveway approaches.

303-5.1.4 Walk. The back of sidewalk shall be 2 inches from the street Right-of-Way line unless otherwise specified by the Engineer.

Included in the price of sidewalk construction are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished sidewalk surface, as a result of grade differentials from existing ground surface to proposed sidewalk surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times. 303-5.1.5 Access Ramps. Construction of curb ramps shall conform to the Type and Case appropriate for the condition, as specified on the plans and as shown within the 201 2 Standard Plans for Public Works Construction, Plan 111 -5. The Contractor shall be responsible to layout the proposed access ramp to comply with the maximum slope indicated on the plans or Standard Plan 111-5. The maximum slope for the ramp shall not be exceeded unless otherwise approved in writing by the Engineer. The Contractor shal l remove and replace access ramps deemed non- compliant with the plans or Standard Plan 111-5.

Redlands Regular Meeting of 09-17-24
682 of 790

GC 60

For proposed locations adjacent to a cross gutter spandrel, sawcuts along the radius of the curb will not be allowed. The spandrel shall be replaced from expansion joint to expansion joint to the extents of the curb removal. For proposed locations adjacent to curb and gutter, sawcuts along the flowline of the curb will not be allowed. The entire curb and gutter shall be replaced from expansion joint to expansion joint as required. Sawcuts at locations other than the expansion joint will not be allowed unless approved by the Engineer. Curb cuts of the existing curb will not be permitted for installation of proposed ramp. Any deviation from these requirements will result in rejection of all work at this location and shall not be included in progress pay ment requests until corrected, per direction from the Engineer.

The Contractor shall verify the extents of sawcut and removal for each access ramp taking into account the maximum slope and transition area required. It shall be the Contractor’s responsibility to identify required removal limits, set concrete forms and verify maximum slopes are not exceeded. The Engineer shall be present to verify the concrete forms prior to the placement of the concrete at each location, however this does not alleviate the responsibility of the accuracy of forms or slopes of the access ramp from the Contractor.

Included in the price of access ramps are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished ramp surface, as a result of grade differentials from existing ground surface to proposed ramp surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times.

Access Ramps shall have truncated domes installed in accordance with standard plans and specifications. Truncated domes on new access ramps shall be Armor-Tile, Cast in Place System, or approved equal. Truncated domes installed on existing surfaces shall be Safety Sted TD, or approved equal. Truncated dome panels shall be 36”x48”, inline configuration, with a spacing of

2.35” on center, and Federal Yellow in color.

The access ramp work shall include all related adjustments of pull boxes, pull box covers, signs, and protection of any underground utilities within the work area. The removal and replacement of up to 5 linear feet of sidewalk on each side of the access ramp shall be included within the cost of the access ramp. The removal and replacement of the sidewalk will allow for transition from the top of ramp to adjacent sidewalk and will be utilized as necessary.

303-5.4.3 Weakened Plane Joints, (a) General. - Add the following paragraph:

All weakened plane joints shall be spaced at a maximum of 3.05 m (10') feet for curbs, gutters, and sidewalks. Scoring lines shall conform to those prevailing in the area and be uniform in spacing.

303-5.5.2 Curb. - Replace the first paragraph with the following:

PCC for curb and gutter shall be placed within three working days from removal of the existing PCC curb and gutter. The curb and gutter surface shall not vary more than 3 mm (0.01') from a 3 Redlands Regular Meeting of 09-17-24
683 of 790

GC 61

m (10') straightedge except at the grade changes. Prior to the removal of the forms, the surface shall be finished true to grade by means of a straightedge float of not less than 3 m (10') in length, and operated longitudinally over the surface of the concrete. Form clamps shall be constructed so as not to interfere with the operation of the float. The form on the front of the curbs shall not be removed less than one (1) hour, nor more than six (6) hours after the concrete has been placed. In no event shall forms be removed while the concrete is sufficiently plastic to slump. The top and face of the finished curb shall be true and straight, and top surface of curbs shall be of uniform width, free from humps, sags, blemishes, or other irregularities.

303-5.5.3 Walk. - Add the following paragraphs:

The sidewalk surface shall not vary more than 5 mm (0.02') from the 3m (10') straightedge except at grade changes, and the finished surface shall be free from humps, sags, blemishes or other irregularities. All sidewalks shall be a minimum of 100 mm (4") thick, except at driveways where the sidewalks shall be a minimum of 150 mm (6") thick for single family residential areas and 200 mm (8") thick for all other areas.

303-5.6 Curing. - Add the following paragraph:

Curing compound shall be translucent with red fugitive dye, Type 1, in accordance with Section 201-4 Concrete Curing Compound, of the Standard Specifications.

303-5.7 Repairs and Replacements. - Add the following paragraphs:

In order to minimize vandalism damage to the finished PCC surfaces, the Contractor shall plan his work so that no PCC is poured after 1:00 p.m., unless otherwise authorized by the Engineer in the field.

The Contractor shall barricade and protect placed Portland Cement Concrete from all damages, marks, mars, and/or graffiti. Any Portland Cement Concrete damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the Engineer at the Contractor's expense, and no additional time will be allowed.

Grading, patching, or other remedies to correct the situation will not be accepted unless in the opinion of the Engineer the vandalized area is so small that it does not warrant replacement.

Concrete replacement areas shall be from score mark or control joint to score mark or control joint, and full width of the sidewalk. All replacement areas shall be saw cut.

303-5.8 Backfilling and Cleanup. - Add the following paragraph:

A minimum of 300mm (12”) wide full depth asphalt concrete pavement repair patch and an 450mm (18”) wide 1 -1/2” deep grind outside of the trench width is required when cross gutter, spandrel, driveways, curb and gutter is placed adjacent to existing asphalt concrete pavement. The asphalt concrete pavement repair patch shall be placed within two (2) working days after the cross gutters, spandrels, driveways, curb and gutter are replaced. The asphalt concrete pavement shall be saw cut. All work shall be in a ccordance with the General Permit Conditions and Trench Specifications, latest edition.

Redlands Regular Meeting of 09-17-24
684 of 790

GC 62

SECTION 304 - METAL FABRICATION AND CONSTRUCTION

304-3 CHAIN LINK FENCE.

304-3.4 Measurement and Payment. - Delete paragraph 1 and replace with:

Chain link fence will be measured along the horizontal projection line of the completed fence, deducting the widths of gates and openings.

SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS

314-1 GENERAL. - Add the following paragraphs:

To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during all striping operations. Refer to Section 7-8.6.

Each storm drain catch basin or storm drain inlet box shall be marked “NO DUMPING - FLOWS TO CREEK.” Two coats of paint are required. Stencil shall match City’s stencil. Paint and painting shall comply with the specifications.

All street resurfacing work shall include installing fire hydrant pavement markers at all fire hydrant location, whether the pavement markers were existing or not. The pavement markers shall be Type I – Two-Way Blue Retroreflective per Section 214-6 of the Specifications and installed per City’s detail drawing No. 102-0. All work associated with the installation of all new, or replacement of existing, fire hydrant pavement markers shall be included as noted within the specifications.

314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.

314-4.1 General. – Add the following paragraphs:

During construction, if traffic legends or lane striping are removed or paved -over for any reason, they shall be replaced immediately with temporary traffic legends or lane striping as directed by the City, and the Contractor shall place permanent traffic legends or lane striping at the end of the job or on completion of final paving. When permanent items are placed, they shall be complete markings, legends, or striping i.e.: if limit lines are disturbed, they shall be replaced to centerline or from curb to curb, whichever was existing; if a letter in a word is removed or covered, the entire word shall be replaced; and lane striping shall extend 75 feet beyond construction limits. All replacement markings, legends, or striping required to be replaced beyond the c ontract limits shown shall be at the cost of the Contractor and shall meet City standards. If existing striping or legends are to be removed on existing surfaces, they shall be sandblasted. Painting over striping or legends in lieu of removal will not be permitted. Pavement striping shall comply with the applicable provisions of Sections 214 and 314 of the Standard Specifications.

Where side streets with existing striping, markings and markers are encountered, striping, markings and markers shall be repainted and replaced for a minimum distance of 15 m (50 feet) from the crosswalk, stop bar or limit line.

Redlands Regular Meeting of 09-17-24
685 of 790

GC 63

314-4.2 Control of Alignment and Layout.

314-4.2.1 General. - Delete and replace with the following:

The Contractor will be responsible for all layout of all striping. All striping, markings and markers shall be reinstalled in their existing locations unless otherwise shown on the plans. The Contractor shall be responsible to take appropriate measures and record the existing locations.

The Contractor shall verify all dimensions in the field prior to installation of pav ement striping/marking layout ( Cat-Track). Should field measurements differ from the plan, the Contractor shall immediately notify City staff. No Cat-Track marks shall be placed until discrepancies are resolved.

Cat-Track must be approved by City staff prior to the installation of perm anent pavement striping/marking. Contractor shall notify City staff a minimum of 24 hours prior to installation of permanent pavement striping/marking to allow for inspection and approval. If approval of Cat - Track is not obtained by the Contractor, all work required to correct the striping/marking will be at the expense of the Contractor

Cat-Track marks shall be made in chalk. Paint for the purpose of Cat-Track is prohibited. If paint is used, the Contractor must r emove the paint without damaging or visually deforming the pavement surface. If damage or visual deformity within the removal area occurs, in the opinion of City staff , the C ontractor shall grind and overlay the entire segment with no additional compensation. The area of the grind and overlay shall be as required by City staff and shall be a minimum of 0.10’ thickness.

All visible Cat -Track markings after the installation of the permanent striping/marking shall be removed without damage or visual deformity to the pavement surface. Any damage or visual deformity to the pavement shall be remedied as noted above.

314-4.3.5 Application. - Amend the first sentence in paragraph 8 as follows:
“Glass beads shall be applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”

314-6 GREEN BIKE LANE. Green bike lanes shall be installed per plan and conform to the technical specifications included within the contract documents and shall be Streetbond CL or approved equal.

Redlands Regular Meeting of 09-17-24
686 of 790

TECHNICAL SPECIFICATIONS
Redlands Regular Meeting of 09-17-24
687 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
688 of 790
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-1

SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES PART 1 - GENERAL
A. Description
This section includes materials and procedures for protecting existing underground utilities.

B. Related Work Specified Elsewhere

1. General Conditions
PART 2 - MATERIALS
A. Replacement in Kind
Except as indicated below or as specifically authorized by the Owner's Representative, reconstruct utilities with new material of the same size, type, and quality as that removed.

B. Vitrified Clay Sewer Pipe and Couplings
For sewer pipe 8 inches in diameter or under, replacement shall consist of plain-end pipe conforming to ASTM C 700. Compression couplings shall conform to ASTM C 594, band seal couplings or equal. Use at least two lengths of pipe in crossing the trench section as shown on the details in the
drawings.

PART 3 - EXECUTION
A. General

1. Replace in kind street improvements, such as curbs and gutters, barricades, traffic islands, signalization, fences, signs, etc., that are cut, removed, damaged, or otherwise disturbed by the construction.

2. Where utilities are parallel to or cross the construction but do not conflict with the permanent work to be constructed, follow the procedures given below and as indicated in the drawings. Notify the utility owner 48 hours in advance of the crossing construction and coordinate the construction schedule with the utility owner's requirements. For utility crossings not shown in the drawings, refer to the General Conditions and the instructions of the Owner's Representative for guidance.

Redlands Regular Meeting of 09-17-24
689 of 790
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-2

3. Determine the true location and depth of utilities and service connections which may be affected by or affect the work. Determine the type, material, and condition of these utilities. In order to provide sufficient lead time to resolve unforeseen conflicts, order materials and take appropriate measures to ensure that there is no delay in work.

4. Expose utilities 1,300 feet in advance of the pipeline construction.

B. Procedures

1. Protect in Place: Protect utilities in place, unless abandoned, and maintain the utility in service, unless otherwise specified in the drawings or in the specifications.

2. Cut and Plug Ends: Cut abandoned utility lines and plug the ends. Plug storm drains and sewers with an 8-inch wall of brick and mortar. Cap waterlines with a cast-iron cap or install a 3-foot-long concrete plug. Dispose of the cut pipe as unsuitable material.

3. Remove and Reconstruct: Where so indicated in the drawings or as required by the Owner's Representative, remove the utility and, after passage, reconstruct it with new materials. Provide temporary service for the disconnected utility.

C. Compaction

1. Utilities Protected in Place: Backfill and compact under and around the utility so that no voids are left.

2. Utilities Reconstructed: Prior to replacement of the utility, backfill the trench and compact to an elevation 1 foot above the top of the ends of the utility. Excavate a cross trench of the proper width for the utility and lay, backfill, and compact.

3. Alternative Construction --Sand Slurry: Sand slurry consisting of one sack (94 pounds) of portland cement per cubic yard of sand and sufficient moisture for workability may be substituted for other backfill materials to aid in reducing compaction difficulties. Submit specific methods and procedures for the review of the Owner's Representative prior to construction.

4. The protection of the utility during construction.

D. Thrust Blocks on Waterlines
Note that restrained joints is the required method of controlling thrust restraint on this project except where shown on the plans or as approved otherwise by the City of Redlands.

1. The Contractor's attention is called to thrust blocks delineated in the drawings for waterlines throughout the project whose thrust is in the direction of the new excavation and, therefore, may be affected by the construction. These waterlines are Redlands Regular Meeting of 09-17-24
690 of 790
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-3

owned and operated by the Owner. Protect thrust blocks in place or shore to resist the thrust by a means approved by the Owner and reconstruct. If the thrust blocks are exposed or rendered to be ineffective in the opinion of the Owner's Representative, reconstruct them to bear against firm unexcavated or backfill material.

2. Provide firm support by backfilling that portion of the trench for a distance of 2 feet on each side of the thrust block to be reconstructed from the pipe bedding to the pavement subgrade, with either:
a. Sand-cement slurry (94 pounds of cement per cubic yard). b.

The native material compacted to a relative compaction of 95%.

3. Then excavate the backfill material for construction of the thrust block.

4. Test compaction of the backfill material before pouring any concrete thrust block.

Use Class 560-C-3250 concrete for reconstruction.

E. Adjacent Parallel Utilities

1. The Contractor's attention is called to utilities throughout the project that are parallel to the proposed utility.

2. The position of these utilities is just outside the new construction. Protect these utilities from any disturbances and repair the lines and associated vaults and appurtenances if they are damaged in any way. All costs incurred for protection of these lines or any costs incurred due to the presence of the lines, whether or not they lie within the new construction, shall be borne in full by the Contractor.

END OF SECTION
Redlands Regular Meeting of 09-17-24
691 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
692 of 790

APPENDIX

Redlands Regular Meeting of 09-17-24
693 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
694 of 790

APPENDIX A

CHECKLIST OF LABOR LAW REQUIREMENTS

Redlands Regular Meeting of 09-17-24
695 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
696 of 790

CHECKLIST OF LABOR LAW REQUIREMENTS

TO REVIEW AT JOB CONFERENCE MEETINGS

Name (print) Date

Company Project

The Federal and State labor law requirements applicable to the contract are composed of, but not limited to, the following:

1. Payment of Prevailing Wage Rates
The contractor to whom the contract is awarded and its subcontractors hired for the public works project are required to pay not less than the specified general prevailing wage rates to all workers employed in the execution of the contract. The contractor is responsible for ascertaining and complying with all current general prevailing wage rates for crafts and any rate changes that occur during the life of the contract.

Information on all prevailing wage rates and all rate changes are to be posted at the job site for all workers to view.

2. Apprentices
It is the duty of the contractor and subcontractors to employ registered apprentices on the public works project under Labor Code Section 1777.5.

3. Penalties
There are penalties required for contractor's/subcontractor's failure to pay prevailing wages and for failure to employ apprentices, including forfeitures and debarment under Labor Code Sections 1775; 1776; 1777.1; 1777.7 and 1813.

4. Certified Payroll Reports
Under Labor Code Section 1776, contractors and subcontractors are required to keep accurate payroll records showing the name, address, social security number and work classification of each employee and owner performing work; also the straight time and overtime hours worked each day and each week, the fringe benefits, and, the actual per diem wage paid to each owner, journey person, apprentice worker or other employee hired in connection with the public works project. Employee payroll records shall be certified and shall be made available for inspection at all reasonable hours at the principal office of the contractor/subcontractor, or shall be furnished to any employee, or his/her authorized representative on request, pursuant to Labor Code Section 1776. Each contractor and subcontractor shall submit its weekly certified payroll reports to the LCR from the agency no less than weekly or within ten days of request. In the event that there has been no work performed during a given week, the certified payroll report shall be annotated: "No work" for that week. Under Labor Code Section 1776(h) there are penalties required for contractor's/ subcontractor's failure to maintain and submit copies of certified payroll records on request. **For projects bidding after April 1, all contractors will need to upload their certified payroll to the Department of Labor Standards Enforcement website. Effective Jan. 1, 2016, ALL projects will require contractors to upload all certified payroll. This requirement is in addition to the request for payrolls by the City of Redlands;

5. Nondiscrimination in Employment
There exist prohibitions against employment discrimination under Labor Code Sections 1735 and 1777.6, the Government Code, the Public Contracts Code, and Title VII of the Civil Rights Act of 1964.

6. Kickbacks Prohibited
Contractors and subcontractors are prohibited from recapturing wages illegally or extracting "kickbacks" from employee wages under Labor Code Section 1778.

Redlands Regular Meeting of 09-17-24
697 of 790

7. Acceptance of Fees Prohibited
There exists a prohibition against contractor/subcontractor acceptance of fees for registering any person for p
ublic work under Labor Code Section 1779; or for filling work orders on public works contracts pursuant to Labor Code Section 1780.

8. Listing of Subcontractors
All prime contractors are required to list properly all subcontractors hired to perform work on the public w
orks projects covering more than one-half of one percent, pursuant to Government Code 4100 et seq.

9. Properly Licensed and Registered
Contractors are required to be licensed properly and to require that all subcontractors be properly licensed.

P
enalties are required for employing workers while unlicensed under Labor Code Section 1021 and under the California Contractor License Law found at Business and Professions Code Section 7000 et seq.

Contractors and subcontractors are also required to be registered with the Division of Labor Standards Enforcement to work on public works projects in California. Requirements for registration and penalties for not being registered are found in Labor Code 1773.3.

10. Unfair Competition Prohibited
Contractors and subcontractors are prohibited from engaging in unfair competition as specified under B
usiness and Professions Code Sections 17200 to 17208.

11. Workers Compensation Insurance
Labor Code 1861 requires contractors and subcontractors be insured properly for workers compensation.

12. OSHA
Contractors and subcontractors are required to abide by the Occupational, Safety and Health laws and r
egulations that apply to the particular construction project.

13. Undocumented Workers
Contractors and subcontractors are prohibited by the Federal government against hiring undocumented w
orkers, and must secure proof of eligibility/citizenship from all workers.

14. Itemized Wage Statements
Contractors and subcontractors must provide itemized wage statements to employees per Labor Code 226.

I
n accordance with Federal and State laws and with th e awarding agency contract documents, t he undersigned prime contractor wishes to assure the City of Redlands that it intends to comply with the above-referenced labor law requirements, fully understanding that failure to comply with the above requirements may subject it to penalties as provided above.

Co
ntractor City of Redlands
N
ame Printed Name Printed
Signature Signature
Title Title
D
ate Date
Redlands Regular Meeting of 09-17-24
698 of 790

IMPORTANT NOTICE
New Requirements for Contractors Working on California
P
ublic Works / Prevailing Wage Projects
Si
gnificant changes in prevailing wage law have recently been made that affect all contractors working on Public Works Projects within California. Please note the following important information:

CONTRACTOR REGISTRATION REQUIREMENT
By April 1, 2015, all contractors must be registered with the Division of Labor Standards Enforcement (DLSE) to work on public works projects in California.

WHO must register?
All contractors and subcontractors working on public works projects in California must be registered. This includes prime contractors, subcontractors and sole owner/operators- everyone performing labor on a public works project.

WHEN is registration required?
Contractors must be registered with the DLSE to bid on all public works projects that bid after March 1, 2015.

All contractors working on public works projects must be registered by April 1, 2015. Registration is valid until June 30 of each year and may be renewed annually. Registrations are currently being accepted.

WHERE do I register?
Registration is done online at:
https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm HO
W MUCH is the fee?
Contractor registration fee is currently set at $300 but may increase each year. This fee shall be paid during the initial registration and each annual renewal.

DO I qualify for registration?
Contractors will need to meet minimum qualification standards to be registered. These include:
• Be properly licensed with the Contractors State Licen se Board for your trade.
• Provide evidence of workers compensation insurance (i f applicable). • Be in good standing (Have no outstanding liabilities for wages, damages, penalties due to an employee or the State, may not be under State or Federal debarment).

Redlands Regular Meeting of 09-17-24
699 of 790

WHAT happens if I don’t register?
Unregistered contractors working on or bidding for public works projects will be subject to an immediate $2,000 fine and the $300 registration fee to continue working on the project. Unregistered contractors may be removed from the project by the Awarding Agency. Contractors found working on public works projects without being registered also risk not being approved for registration by DLSE.

ELECTRONIC CERTIFIED PAYROLL REPORTING REQUIREMENTS

Prevailing wage law has been changed to require contractors to submit certified payrolls electronically to the DLSE.

WHO is required to submit certified payrolls?
All contractors, subcontractors and sole owner/operators will be required to submit certified payrolls electronically to the DLSE.

WHEN do I need to submit certified payrolls electronically? If your project is awarded after April 1, 2015, electronic payroll submission is required immediately.

Otherwise, electronic payroll submission will be required for all projects awarded on or after January 1, 2016.

WHERE do I submit my certified payrolls?
For now, certified payrolls can be submitted by contractors to the DLSE at:
https://apps.dir.ca.gov/ecpr/DAS/AltLogin This website address will change when the DLSE implements their online electronic database system which still has not been developed. Alliant will notify contractors when this system is available.

DO I still need to submit hard copy certified payrolls? The City of Redlands will still require hard copy submission of certified payroll reports per your contract. The requirement to submit certified payrolls electronically to the DLSE does not replace the requirement for contractors to submit payrolls to the City of Redlands.

Contact the City of Redlands regarding any questions you may have regarding the new requirements for contractor registration or online submission of certified payroll: (909) 798-7698.

Redlands Regular Meeting of 09-17-24
700 of 790
PUBLIC WORKS CONTRACT AWARD INFORMATION (DAS-140)
This is not a request for dispatch of apprentices.

Contract award information must be sent to your Apprenticeship Committee if you are approved to train. If you are not approved to train, you must send the information (which may be this form) to ALL applicable Apprenticeship Committees in your craft or trade in the area of the site of the public work.

Go to: http://www.dir.ca.gov/das/PublicWorksForms.htm for information about programs in your area and trade. The information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Do not send this form to the Division of Apprenticeship Standards.

NAME OF YOUR COMPANY CONTRACTORS STATE LICENSE NO.

MAILING ADDRESS-NUMBER & STREET, CITY, ZIP CODE AREA CODE & TELEPHONE NO.

NAME AND ADDRESS OF PUBLIC WORKS PROJECT DATE YOUR CONTRACT WAS EXECUTED

DATE OF EXPECTED/ACTUAL START OF PROJECT

NAME & ADDRESS OF PUBLIC AGENCY AWARDING CONTRACT ESTIMATED NUMBER OF JOURNEYMAN HOURS

OCCUPATION OF APPRENTICE

THIS FORM IS BEING SENT TO: (NAME AND ADDRESS OF APPRENTICESHIP PROGRAM(S) ESTIMATED NUMBER OF APPRENTICE HOURS

APPROXIMATE/ACTUAL DATES TO BE EMPLOYED

This is not a request for dispatch of apprentices.
*Contractors must make a separate request for actual dispatch, in accordance with Section 230.1(a) California Code of Regulations* Check One of the Boxes Below

1. We are already approved to train apprentices by the
Apprenticeship Committee. We will employ and train under their standards. (Enter name of Committee)

2. We will comply with the standards of
Apprenticeship Committee for the duration of this job only. (Enter name of Committee)

3. We will employ and train apprentices in accordance with the California Apprenticeship Council regulations, including § 230.1 (c) which requires that apprentices employed on public projects can only be assigned to perform work of the craft or trade to which the apprentice is registered and that the apprentices must at all times work with or under the direct supervision of journeyman/men.

Signature Date

Typed Name

Title

Redlands Regular Meeting of 09-17-24
701 of 790

2J

DAS-140 FORM - PUBLIC WORKS CONTRACT AWARD INFORMATION
(Title 8, California Code of Regulations, Section 230)
(California Labor Code, Section 1777.5 (e))

SUBMIT CONTRACT AWARD INFORMATION

Prior to commencing work on a contract for Public Works every Contractor shall provide contract award information to the apprenticeship committee for each applicable apprenticeable craft or trade in the area of the site of the public works project that has approved the contractor to train apprentices. Contractors who are not already approved to train by an apprenticeship program sponsor shall provide contract award information to all of the applicable apprenticeship committees whose geographic area of operation includes the area of the public works project. This contract award information shall be in writing on a DAS Form 140, Public Works Contract Award Information or a letter which includes the following information:

(1) Contractor's name, address, telephone number and state license number; (2) The full name and address of the public work awarding agency; (3) The exact location of the public work site;
(4) Date of the contract award;
(5) Expected start date of the work;
(6) Estimated journeyman hours;
(7) Occupation of Apprentice;
(8) Approximate number of apprentices to be employed; and (9) Approximate dates apprentices will be employed.

This information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Failure to provide contract award information, which is known by the awarded contractor, shall be deemed to be a continuing violation for the duration of the contract, ending when a Notice of Completion is filed by the Awarding Body, for the purpose of determining the accrual of penalties under Labor Code Section 1777.7.

THE TOP SECTION OF THE FORM COMPLETELY FILLED OUT will provide the information required pursuant to California Labor Code Section 1777.5 and California Code of Regulations Section 230.1.

LOWER SECTION OF THE FORM Check an appropriate box (#1, 2 or 3) for your status.

In addition to the “ORIGINAL(S)” mailed to all applicable Apprenticeship Committees, a copy of this information shall also be submitted to the City of Redlands.

NOTE: The filing of a DAS 140 is not a request for the dispatch of registered apprentices Redlands Regular Meeting of 09-17-24
702 of 790

CONTRACTOR FRINGE BENEFIT STATEMENT

Project Name: Project Location: Today’s Date:

Contractor / Subcontractor Name: Business Address:

In order that the proper Fringe Benefit rates can be verified when checking payrolls on the above contract, the hourly rates for fringe benefits, subsistence and/or travel allowance payment made for employees by the employer on the various classes of work are tabulated below. Please Include Apprentice Rates.

Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS

Health & Welfare

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Vacation/Holiday

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Other

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________

Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS

Health & Welfare

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Vacation/Holiday

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Other

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Supplemental statements must be submitted during the progress of the work should there be an increase or change in rates. Use additional sheets as necessary. (Attach a copy of your most recent premium transmittal (including copy of check submitted) into each of the above plans/funds/programs or a letter from the above plans/funds/programs reflecting current payment status).

I certify under penalty of perjury that fringe benefits are paid to the approved plans, funds or programs as listed above.

Print Name and Title Signature and Date (Wet Signature Required)

Redlands Regular Meeting of 09-17-24
703 of 790

S = STRAIGHT TIME *OTHER – Any other deductions, contributions and/or payments whether or not included or required by prevailing C ERTIFICATION MUST be completed Form A-1-131 (New 2-80) O = OVERTIME wage determinations must be separately listed. Use extra sheet(s) if necessary (See reverse side)

SDI = STATE DISABILITY INSURANCE
California
Department of
Industrial Relations
Page ______ of ______

NAME OF CONTRACTOR: CONTRACTOR'S LICENSE NO.: ADDRESS:

OR SUBCONTRACTOR: SPECIALITY LICENSE NO.:

PAYROLL NO.:

FOR WEEK ENDING:

S
ELF-INSURED CERTIFICATE NO.:

PROJECT OR CONTRACT NO.:

(4)

DAY

(5)

(6)

WORKERS' COMPENSATION POLICY NO.:

PROJECT AND LOCATION:

(
2)

M

T

W

TH

F

S

S

(9)

DATE

(1)

NAME, ADDRESS AND

SOCIAL SECURITY NUMBER

OF EMPLOYEE

NO. OF WITH-

HOLDING

EXEMPTIONS

(3)

WORK

CLASSIFICATION

H

OURS WORKED EACH DAY

T
OTAL
HOURS

HOURLY
RATE
OF PAY

(7)

GROSS AMOUNT
EARNED

(8)

DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS

NET WGS

PAID FOR
WEEK

C
HECK
NO.

THIS
P
ROJECT

ALL
P

ROJECTS

FED.

T
AX

FICA
(
SOC. SEC.)

STATE
T
AX

S
DI

VAC/
H
OLIDAY

HEALTH
&
WELF.

P
ENSION

S

T
RAING.

F
UND
ADMIN

D
UES

TRAV/
S
UBS.

S
AVINGS

O
THER*

TOTAL
D
EDUC-
TIONS

O

THIS
P
ROJECT

ALL
P

ROJECTS

FED.

T
AX

FICA
(
SOC. SEC.)

STATE
T
AX

S
DI

VAC/
H
OLIDAY

HEALTH
&
WELF.

P
ENSION

S

T
RAING.

F
UND
ADMIN

D
UES

TRAV/
S
UBS.

S
AVINGS

O
THER*

TOTAL
D
EDUC-
TIONS

O

THIS
P
ROJECT

ALL
P

ROJECTS

FED.

T
AX

FICA
(
SOC. SEC.)

STATE
T
AX

S
DI

VAC/
H
OLIDAY

HEALTH
&
WELF.

P
ENSION

S

T
RAING.

F
UND
ADMIN

D
UES

TRAV/
S
UBS.

S
AVINGS

O
THER*

TOTAL
D
EDUC-
TIONS

O

THIS
P
ROJECT

ALL
P

ROJECTS

FED.

T
AX

FICA
(
SOC. SEC.)

STATE
T
AX

S
DI

VAC/
H
OLIDAY

HEALTH
&
WELF.

P
ENSION

S

T
RAING.

F
UND
ADMIN

D
UES

TRAV/
S
UBS.

S
AVINGS

O
THER*

TOTAL
D
EDUC-
TIONS

O

PUBLIC WORKS PAYROLL REPORTING FORM
Redlands Regular Meeting of 09-17-24
704 of 790
Statement of Compliance
Date:______________

I __________________, the undersigned, am the ________________________________ with the authority to act for and on (Print Name) (Position in Business) behalf of _______________________ certify under penalty of perjury that the records commencing on ______________ and ending on _______________ submitted herein and consisting of ____ pages are the originals, full and corrected documents, which depict the payroll record(s) of actual disbursements by way of cash, check, or whatever form to the individual or individuals names,

(1) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work Performed.
(2) That any apprentices employed in the above period are duly registered to a bona fide apprenticeship program registered with the State of California’s Division of Apprenticeship Standards.

PAYROLL/OTHER DEDUCTIONS

1. I herein certify the full and complete Prevailing Wages were paid as currently published and posted by the Director of Industrial Relations, State of California and only deductions as authorized under the laws of the State of California or the laws of United States of America have been made from these sums.

2. All other deductions are clearly listed for each employee on an attachment as required by the Director of Industrial Relations, State of California.

OPTIONAL BENEFIT PLANS

I herein certify that all employee deductions for benefit plans are authorized and the employee(s) are signed up for the plan(s) and are receiving the benefit(s) of the plan(s) listed.

 WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above payroll, payment of fringe benefits as listed in the contract have or will be made to the appropriate programs for the benefit of such employees, except as noted below.

 WHERE FRINGE BENEFITS ARE PAID IN CASH
Each laborer or mechanic listed in the above payroll has been paid as indicated on the payroll, an amount not less the sum of the applicable basic hourly rate plus the amount of the required fringe benefits as listed in the determination for the craft, except as noted below,

Exception(s)
________________________________________________________________________________________________________ Craft Explanation ________________________________________________________________________________________________________ Craft Explanation ________________________________________________________________________________________________________ Craft Explanation

I herein certify under the penalty of perjury all of the above is true and correct as submitted. ________________________________________________________________________________________________________ Name Signature

________________________________________________________________________________________________________ Date Payroll #
Remarks

____________________________________________________________________________________________________ Redlands Regular Meeting of 09-17-24
705 of 790
2N

CONTRACTOR INFORMATION SHEET
Jo
b Name: _________________________________________ Category: ____________________________________ Prime Contractor: ___________________________________________________________________________________ Subcontractor: ______________________________________ License#: _____________________________________ Address: ____________________________________________________________________________________________ Phone #: ___________________________________________ Payroll Report Contact: _______________________ Email Address: _____________________________________________________________________________________ Fax #: ______________________________________________ Contract Amount: ____________________________ Estimated Start Date: _______________________________ Estimated End Date: _________________________ ANTICIPATED TRADES/CLASSIFICATIONS:
______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ SUB-CONTRACTORS (if applicable)
Name: License #: Phone/ Fax #: Contact:
______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ Redlands Regular Meeting of 09-17-24
706 of 790

APPENDIX B

CITY OF REDLANDS WORKDAY CONSTRUCTION

SCHEDULE
Redlands Regular Meeting of 09-17-24
707 of 790

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 09-17-24
708 of 790

CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 2024

APPENDIX B

CONSTRUCTION WORKDAY CALENDAR

JANUARY

FEBRUARY

MARCH
S

M

T

W

T

F

S

S

M

T

W

T

F

S

S

M

T

W

T

F

S

1 2

3 4

5 6

1 2

3 1

2 1 2 3 4 5 6 32 33 34 61 62
7 8

9 10

11 12

13 4

5 6

7 8

9 10

3 4

5 6

7 8

9 7 8 9 10 11 12 13 35 36 37 38 39 40 41 63 64 65 66 67 68 69 14 15

16 17

18 19

20 11

12 13

14 15

16 17

10 11

12 13

14 15

16 14 15 16 17 18 19 20 42 43 44 45 46 47 48 70 71 72 73 74 75 76 21 22

23 24

25 26

27 18

19 20

21 22

23 24

17 18

19 20

21 22

23 21 22 23 24 25 26 27 49 50 51 52 53 54 55 77 78 79 80 81 82 83 28 29

30 31

25 26

27 28

29 24

25 26

27 28

29 30
28 29 30 31 56 57 58 59 60 84 85 86 87 88 89 90

31 91

APRIL

MAY

JUNE
S

M

T

W

T

F

S

S

M

T

W

T

F

S

S

M

T

W

T

F

S

1 2

3 4

5 6

1 2

3 4

1 92 93 94 95 96 97 122 123 124 125 153
7 8

9 10

11 12

13 5

6 7

8 9

10 11

2 3

4 5

6 7

8 98 99 100 101 102 103 104 126 127 128 129 130 131 132 154 155 156 157 158 159 160 14 15

16 17

18 19

20 12

13 14

15 16

17 18

9 10

11 12

13 14

15 105 106 107 108 109 110 111 133 134 135 136 137 138 139 161 162 163 164 165 166 167 21 22

23 24

25 26

27 19

20 21

22 23

24 25

16 17

18 19

20 21

22 112 113 114 115 116 117 118 140 141 142 143 144 145 146 168 169 170 171 172 173 174 28 29

30 26

27 28

29 30

31 23

24 25

26 27

28 29
119 120 121 147 148 149 150 151 152 175 176 177 178 179 180 181

30 182

JULY

AUGUST

SEPTEMBER
S

M

T

W

T

F

S

S

M

T

W

T

F

S

S

M

T

W

T

F

S

1 2

3 4

5 6

1 2

3 1

2 3

4 5

6 7
183 184 185 186 187 188 214 215 216

245 246 247 248 249 250 251
7 8

9 10

11 12

13 4

5 6

7 8

9 10

8 9

10 11

12 13

14 189 190 191 192 193 194 195 217 218 219 220 221 222 223

252 253 254 255 256 257 258
14 15

16 17

18 19

20 11

12 13

14 15

16 17

15 16

17 18

19 20

21 196 197 198 199 200 201 202 224 225 226 227 228 229 230

259 260 261 262 263 264 265
21 22

23 24

25 26

27 18

19 20

21 22

23 24

22 23

24 25

26 27

28 203 204 205 206 207 208 209 231 232 233 234 235 236 237

266 267 268 269 270 271 272
28 29

30 31

25 26

27 28

29 30

31 29

30 210 211 212 213 238 239 240 241 242 243 244

273 274

OCTOBER

NOVEMBER

DECEMBER
S

M

T

W

T

F

S

S

M

T

W

T

F

S

S

M

T

W

T

F

S

1 2

3 4

5 1

2 1

2 3

4 5

6 7
275 276 277 278 279 306 307

336 337 338 339 340 341 342
6 7

8 9

10 11

12 3

4 5

6 7

8 9

8 9

10 11

12 13

14 280 281 282 283 284 285 286 308 309 310 311 312 313 314

343 344 345 346 347 348 349
13 14

15 16

17 18

19 10

11 12

13 14

15 16

15 16

17 18

19 20

21 287 288 289 290 291 292 293 315 316 317 318 319 320 321

350 351 352 353 354 355 356
20 21

22 23

24 25

26 17

18 19

20 21

22 23

22 23

24 25

26 27

28 294 295 296 297 298 299 300 322 323 324 325 326 327 328

357 358 359 360 361 362 363
27 28

29 30

31 24

25 26

27 28

29 30

29 30

31 301 302 303 304 305 329 330 331 332 333 334 335

364 365 366

City Holiday
Closed

Redlands Regular Meeting of 09-17-24
709 of 790
1 2 3 4 7 8 9 10 11 14 15 16 17 18 21 22 23 24 25 28 29 30 31 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30

H P P H

H P P H
1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 31 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31

P X H M M M M M H H H H H H H H H H H H H

P H H H H H H X H H H H H H H H
1 2 5 6 7 8 9 12 13 14 15 16 19 20 21 22 23 26 27 28 29 30 2 3 4 5 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 2 3 4 5 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31

H H H H H H H H H M H H H H H H H

H H H H H H H H H H H H H H H H
1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30

H H H H M M P H

H H H H M P H
Attendance Days
Independence Day July 4 Quarter 1 October 3 (42 days) Trimester 1 October 31 (61 days) Semester 1 December 19 (89 days) Students Labor Day September 1 Quarter 2 December 18 (47 days) Trimester 2 February 27 (61 days) Semester 2 June 4 (91 days) Teachers Veteran's Day November 11 Quarter 3 March 20 (48 days) Trimester 3 June 4 (58 days) Thanksgiving Break November 24 - 28 Quarter 4 June 4 (43 days) Winter Break December 22 - January 9
Martin Luther King, Jr. Day January 19
Presidents' Day February 16
Spring Break March 16 - April 3
Memorial Day May 25
Juneteenth June 19
Elementary
Secondary
H Holiday (No Students in Attendance)
M Minimum Day (Conferences/Report Card Preparation)
P Staff Professional Day (No Students in Attendance)
X Report Card Day (No Students in Attendance) Board Approved: 02/13/24 180
185
Holidays (No Students in Attendance) End of Quarter Dates End of Trimester Dates End of Semester Dates January February March
April May June
November December
Redlands Unified School District
Student Attendance Calendar (All Schools)
2025-2026 School Year
July August September
October
Redlands Regular Meeting of 09-17-24
710 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
711 of 790

APPENDIX C

STANDARD DRAWING
Redlands Regular Meeting of 09-17-24
712 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
713 of 790
Redlands Regular Meeting of 09-17-24
714 of 790
Redlands Regular Meeting of 09-17-24
715 of 790
Redlands Regular Meeting of 09-17-24
716 of 790
Redlands Regular Meeting of 09-17-24
717 of 790
California MUTCD 2014 Edition
(FHWA’s MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) C
hapter 3B – Pavement and Curb Markings November 7, 2014 Part 3 – Markings

Page 742 ends

Redlands Regular Meeting of 09-17-24
718 of 790
California MUTCD 2014 Edition
(FHWA’s MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) C
hapter 3B – Pavement and Curb Markings November 7, 2014 Part 3 – Markings

Page 743 ends

Redlands Regular Meeting of 09-17-24
719 of 790
California MUTCD 2014 Edition
(FHWA’s MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) C
hapter 3B – Pavement and Curb Markings November 7, 2014 Part 3 – Markings

Page 745 ends

Redlands Regular Meeting of 09-17-24
720 of 790
California MUTCD 2014 Edition
(FHWA’s MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) C
hapter 3B – Pavement and Curb Markings November 7, 2014 Part 3 – Markings

Page 746 ends

Redlands Regular Meeting of 09-17-24
721 of 790
California MUTCD 2014 Edition
(FHWA’s MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) Chapter 9C – Markings November 7, 2014
Part 9 – Traffic Control for Bicycle Facilities

Page 1394 ends

Redlands Regular Meeting of 09-17-24
722 of 790
Redlands Regular Meeting of 09-17-24
723 of 790
Redlands Regular Meeting of 09-17-24
724 of 790
Redlands Regular Meeting of 09-17-24
725 of 790
Redlands Regular Meeting of 09-17-24
726 of 790
Redlands Regular Meeting of 09-17-24
727 of 790
Redlands Regular Meeting of 09-17-24
728 of 790
Redlands Regular Meeting of 09-17-24
729 of 790
Redlands Regular Meeting of 09-17-24
730 of 790
Redlands Regular Meeting of 09-17-24
731 of 790
Redlands Regular Meeting of 09-17-24
732 of 790
Redlands Regular Meeting of 09-17-24
733 of 790
Redlands Regular Meeting of 09-17-24
734 of 790
Redlands Regular Meeting of 09-17-24
735 of 790
Redlands Regular Meeting of 09-17-24
736 of 790
Redlands Regular Meeting of 09-17-24
737 of 790
Redlands Regular Meeting of 09-17-24
738 of 790
Redlands Regular Meeting of 09-17-24
739 of 790
Redlands Regular Meeting of 09-17-24
740 of 790
Redlands Regular Meeting of 09-17-24
741 of 790
Redlands Regular Meeting of 09-17-24
742 of 790
Redlands Regular Meeting of 09-17-24
743 of 790
Redlands Regular Meeting of 09-17-24
744 of 790
Redlands Regular Meeting of 09-17-24
745 of 790
Redlands Regular Meeting of 09-17-24
746 of 790
Redlands Regular Meeting of 09-17-24
747 of 790
12"

ELEVATION VIEW

PLAN VIEW
}
12" MIN.
18" MAX.
3" & 6" GRADE

ADJUSTMENT
RINGS
VARIES12"

MANHOLE RING & COVER
12"

CONCRETE
COLLAR

1. SAW CIRCULAR AROUND MANHOLE 12" FROM MANHOLE FRAME.

2. MANHOLE SHALL BE MARKED PRIOR TO CUT THE PAVEMENT.

3. RAISE MANHOLE FRAME AND COVER TO FINISH GRADE BY
INSTALLING CONCRETE RINGS AND LEVELING MORTAR.

4. BACKFILL WITH PCC CONCRETE TO FINISH GRADE.

5. CONCRETE TYPE SHALL BE 560-C-3250.

6. ADD QUIKRETE LIQUID CEMENT COLOR - CHARCOAL BLACK.

7. PROTECT FROM TRAFFIC LOADING UNTIL CONCRETE HAS CURED.

8. APPLY TACK COAT TO EDGES OF EXISTING PAVEMENT BEFORE INSTALLATION PATCH.

9. COLLARS ARE REQUIRED FOR ALL PAVED TRAVEL WAYS.

NOTE:

AC PAVEMENT

CUT LINE

CONCRETE
COLLAR

CUT LINE

CUT LINE

MANHOLE RING & COVER

CONCRETE
COLLAR

LIMIT STRIPING

TO MANHOLE COVER

LIMIT STRIPING

TO MANHOLE COVER
8"

CONCRETE COLLAR
Redlands Regular Meeting of 09-17-24
748 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
749 of 790

APPENDIX D

a. City Encroachment Permit Form
(Contractor to obtain encroachment permit from the City as no-fee permit)

Redlands Regular Meeting of 09-17-24
750 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
751 of 790
PERMIT NO. _________
Name: Phone:

Address: City: Zip:

Contractor: USA ID No.:

Contractor License No.: Type: Cal OSHA No.:

Construction Start Date:

Development No.: Plan No.:

Street Name:

Cross Streets:

Address:

For the purpose of performing the following work:

Applicant/Agent Signature:

EACH
EA $ $ 43.00 EA =$ Truck Route Permit Required:

SF $ $ .44 SF =$
SF $ $ .87 SF =$
LF $ $ 3.28 LF =$ Closure Permit With
LF $ $ 2.19 LF =$ Traffic Plan Required:

SF $ $ .09 SF =$
SF $ $ .09 SF =$
EA $ $ 43.00 EA =$ Water Shutdown Required:

EA $ $ 2,568.00 EA =$
EA $ $ 2,011.00 EA =$
CY $ $ 130 CY =$ Bond Required:

LF $ $ 5.21 LF =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
LF $ $ 1.73 LF =$
EA $ $ 43.00 EA =$ Conduit Material:

EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
LF $ $ 1.73 LF =$ Conduit Size:

LF $ $ 1.73 LF =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
LF $ $ 1.73 LF =$
SF $ $ .18 SF =$
EA Fire Flow Test……………………………… $ EA =$
SF $ SF =$
EA $ $ 55.00 EA =$ Calculated By
HR OT/Off Hrs Inspection (2 HR Min) $ $ 122.60 HR =$
$ =$
$ =$
SUBTOTAL PERMIT FEE $
PERMIT FEE work complete within specified date from issuance = $ 339.00 fee.

Municipal Utilities & Engineering
$
TOTAL ENCROACHMENT PERMIT FEE $

0.00 $339.00

86.00 86.00

86.00 86.00

86.00 Application for Road / Encroachment Permit
City of Redlands - Municipal Utilities & Engineering Department Anticipated Completion Date:

I hereby request permission to construct/install improvements/facilities within the City of Redlands road right-of-way at the following location:

86.00 86.00

86.00 86.00

86.00 86.00

86.00 86.00

86.00 86.00
BASE
Date:

Driveway Appr, Res/Comm……………….

Sidewalk……………………………………
Cross Gutter/Spandrel……………………
Crushed Aggregate Base…………………
Curb & Gutter………………………………
Curb/Berm………………………………….

Traffic Signal - Modification……………….

SHADED AREA FOR OFFICIAL USE ONLY
In accordance with Plans approved by the Municipal Utilities & Engineering Director and/or the Standard Specifications and Detail Drawings of the City of Redlands for the quantity and type
of improvements listed below:

86.00 86.00Street Light…………………………………
Traffic Signal - New……………………….

Asphalt Pavement…………………………

86.00 86.00

86.00 86.00

10.00 (Effective 10/7/2020)
PENALTY FEE 25% of total permit fee if issued after commencement of work Sewer Manhole…………………..……….

Reinforced Concrete………………………
Storm Drain Pipe…………………………..

Curb Inlet/Outlet Structures………………
Water Shutdown…………………………..

Fire Service…………………………………
Sewer Cleanout……………………………
Sewer Lateral………………………………
Water Main - Potable……………………..

Water Main - Non-Potable……...………..

Fire Hydrant Assembly……………………
Water Service Lateral……………………..

Storm Drain Manhole/Junction Box……..

Curb Core…………………………………..

Sewer Main……………………..…………

86.00 86.00

86.00 86.00

86.00 79.00
Excavation/Utility Trench………..….…….

Street Patch………………………………..

Warranty Fee (Street Cut)……………..…
Traffic Safety Setup………………………..

YES NO
YES NO
YES NO
YES NO
Redlands Regular Meeting of 09-17-24
752 of 790

APPENDIX E

TRASH COLLECTION SCHEDULE
Redlands Regular Meeting of 09-17-24
753 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
754 of 790
Thursday
Monday
Friday
Tuesday
Thursday
Wednesday
Friday
ST
ST
AV

AVEW SAN BERNARDINOSANAV AV AVEBERNARDINO

STST ORANGE
VIEW
OPA
L
JUDSON

ALABAMA MENTONE BLVDAVCALIFORNIA LUGONIAEW
ST
ST

MOUNTAIN ST
STAV
AV

CHURCH AVCOLTONEAVCOLTONW

REDLANDS ST
ST

BLVD ST
TEXAS
UNIVERSITYN 6TH

W DEARBORN

NNREDLANDS JUDSON

N AVCITRUSAVCITRUSETENNESSEE
ST
FORD

ST CRAFTON

AVST ST
AV ST
AVFERN
S E

DEARBORN

CALIFORNIA
OPAL
FORD
5THALABAM
A
S 5TH AVAVBROOKSIDE AV SAND
BARTON

TERRACINA AVRD S
CENTER

AV AV HIGHLAND
CANYON

BROOKSIDE E ST

SAN SAN
FERN

RDTIMOTEO AV
CANYON
W
MATEO

CYPRESS CAJON
ST AV
ST

BLVDRD GARDEN
W
ST SUNSETE 16TH
ST
DR N

HIGHLAND

WABASHST

ELIZABETHW

E YUCAIPA

ST SUNSET
ST

ALESSANDRO
GARDEN
DR N
ST
WRD
SUNSET
16TH
OUTER
SAN
DR
HWY 10
SUNSET

TIMOTEO
E
RD
CANYON
CANYON
RD
OAK
LIVE
OAK
W
ABASH
AV

STDEARBORN
DRS

E REDLANDS
BL

LIVE RD

W BERNARDINO

CAJONST

MILL CREEK RD

DR N

E SUNSET

W LUGONIA AV

PIONEER
W
AV
AV

PALMETTO AV

MARIGOLD AV
N
NEVADA
ST
RD

ALESSANDRO

ORANGE ST

E REDLANDS BL
FO
RD
ST

E PIONEER AV

ST BLVD

SAN BERNARDINO
NEVADA

CHAPMAN HEIGHTS RD

VICTORIA
DR

STS HARDT SHEDDEN
CURTIS

STGOULD

OAK CANYON RD

HARDT ST

GOULD ST
25201

PARK AV

CITRUS ST

COTTAGE ST

PALM DR

POPLAR DR

VAN LEUVEN ST

COLE ST

WILLIS DR

STATE ST

SHEDDEN DR

VICTORIA AV

REVELLO

RDKEISSEL RD
ST

GREENSPOT

VILLERS
WY
BRANDO
N
MOU
NTAIN
CT
CT
CT LN
CA

STLEGATE

CRYSTAL COVE

CRYSTAL

SPRINGS LN

FURLOW DR

COLORADO ST

DOMESTIC AVE

DEODAR ST

RIVERVIEW DR
CT

VIRGINIA
DUBOIS
REED

VISTA CIR

BLUE JAY LN
BLUE
BIRD
LN
MIDWAY

RIVERVIEW DR
ST
ST
ST
LN
ST
CIR
YVETTE
WATERS
CAVE

HUBBARD

BEATTIE
ST
BEAL
CT
ST

ANDERSON
CT

SINCLAIR
CT
CT
ST
WY
VACHE
SOLANO
WY

KINGSBURY
DR

RIVERVIEW DR
MORGAN
RILEY
WY
DR

TANGERINE
DR

DRALEXIS LN

AVIATION DR

SESSUMSST AV
DR
OPAL

SAPPHIRE

FLORIDA
EM
ERALD

NEWPORTST

AMETHYST AV
ST

RIVERVIEW

ST DR CTWALLACEE
COOLEY

RICHARDSON

RIVERVIEW AV

SAN BERNARDINO AV

SHEDDEN

TROLLEY

PIONEER AV
ELISE
ST

TENNESSEE
DR
STSTST
AV
ALTA
CLAY

WASHINGTON

ELISE SAN

DR JUAN
ST
DREKA
ST
STST

WOOD-BURY
ST

ELISEDRELISE

DRELISEDR CANTERBURY
DRCIR

BALDWIN AV
ST
GAIL
ST
YUKON
AV
DOYLE
CT

CTCT CT
NKIRBY

QUINCY NATHAN

EDDYJAMES CT
CT

STON YKIMBERLY
DUKE

FRONTIER
CHURCH

MADISON

STHARTZELL

STDOYLE
CT CT

IRWINHERONGLOVER
ST
ALTA
ST
AV
AV
JASON
GLOV
ER

BROOKSTON
E
EALTA

AVMULVIHILL
WY
SHERRY

TIVOLI DR VERONA DR

MARGIT STCHERYL ST

SONATA DR

AV GREY-
STON E
AV

LUCY ST
DR
AV
CIRCT
O
CC
ID
ENTAL
ST
ST

CTHEIDI AV
JOANNE

ROSE ST

TORINO ST

DOYLE AVE

STICKNEY
DEANNA
WY

OCCIDENTAL
AV CIR
AUSTIN

STAR RUBY
CT

PUMMELO

RIVERBEND
ST
CORTEZ
JUDSON

MORIARTY ST

KIMBERLY AV
WABASH
AV
CAPRI

FOOTHILL

IMPERIAL
CT
G
RAN
ITE
ST
CAPRI
AV
AV

SOFFEL AVAV
AV

ANZIO AV

SALERNO AV
AVAV
GARNET
HARDT
ST

GOULD DR
AV

ALMOND ALMOND AV W
ST ST

ARLENEFRANCES
KARON

STASHLEY
WY
CITRUS
PLAZA
ST

TENNESSEE
AV
EW

DELAWARE

OHIO ST
CLAY
ST
ST E
SAN
ST
OHIO
EAV
AV

PENNSYLVANIA

EMERALD
ST
ST

RUBY AV
AV
CT

STW SHARON RD

CALHOUNCOLUMBIALIVE OAK

WEBSTER
ST ST
ST
ST
W
EBSTER
VERM
ONT

COLUMBIA

LEMONWOOD
E

EBERKELEYHUNTER DR
E
PL
ROBYN
DR
DENISE

JURUPA AV

HIDALGO
AV

DE ANZA ST
E

SHARON R D

COURIERST
ST AV

DELAWARE AV
6TH
ST

LNHOLLY
CHURCH
MARCOS

AV LASSEN

PENNSYLVANIA
ST

GROVEVILLAGE
CT
WY
SHAWN
ST N
MOBILE
HOME
PARK
KELLY
ST
ST

TANFORAN

STDRTHOMAS WY
STAV

NICKOLAS

AV PHELAN

DELAWARE AV C
EN
TUR
Y
ST

LANFAIRAV GLEN

KINGSWOODSHARON HAVEN

SANDALW OODRD M

EDALLIO
N

AV BENBOW PLAVLUGONIA THAMES
ST

HANFORD
AV

LALANIA AV

CAROLYNCT
AV
ROSE
ARBOR
CT

PAIUTE AV
CT
PL

PALOMA ST

DARLENE

SUSAN AV

JEAN AV

MONA AV
CT
JULIE

REES ROSALIE
ST
PECOS

PUEBLO AV

PARA-NELSO
N
ST

SANDRA WY DISE WY
CT CT
CHRYSO
LITE
CT
AVE
CT

GOLD BUCKLE
CTHAWK
BLACK
C
A
M
BRIA
CT
ST
ST
VIA

ST PALERMOVIA
WY
CT

SUN DOW N

CT CO V E
CT

BLUE WING

SI LVER CUP CT

GO LD CUP

NARANJO
CT
W
Y

PALA BE LLS
CT

REVELATIO
N
SIERRA

CREST CTVAL LEY FALLS
R
ED
BIRD
C
T

VE N ICE
O
LIVINE
M

ALACHITE
BERYL
AV
AV
AVAV
AV
JASPER

BRIGHTON
WY

AV OPAL

AVNAPLES AV

TURQUOISE

WHITEWOOD DR

APPLEWOOD DRLAURELWOOD LN
BEECH

TREE LN

MAPLEWOOD LN
CEDAR
LANE
DR
MAPLE
CT

ALDERWOOD
LN

PLUMWOOD
LN
AGATE

CRAFTON
LN
LN
BEECH

TREE CT
SIERRA

PINE DR
AV

MADEIRA AV

SLATE ST
ST

BEECH TREE PL
SALIC
AV
NAPLES
ST
LN
LN
LN

FAIRVIEWVIEW

SLIGERORANGE

SLIGERRD

MOUNTAIN
STST

MENTONE AV
GARNET
AV
WY
BONITA
WARD
CT

ZANJA VIEW DR
RD

POPLAR ST

COLOMA ST

MEAD ST

LILAC ST

REMSEN ST
ELM
AV

BUSINESS

DRST DR

CORPORATE ENTERPRISECOMMERCE

RESEARCH

INDUSTRIAL
ELM

DAVIDSON

CURTISCOULSTON
ST
S
ST

RICHARDSON CURTIS

DAVIDSON ST

AURORA LA

COULSTON
ST

AVAV EROSENA
CURTIS
LN

REDLANDS BLVD

ROSEWOOD

DRSPADE

COULSTON
SUN

TUDOR CT
ST
PL
STTAFT
AV

SEVERNCARDIGAN

SNOW DENST

MAWRBRYN RHONDA

BRYN MAWR AV
DR
CIR

INDUSTRIAL
IDAHO
ST

INDUSTRIAL

TRI-CITYCENTER
DR

CTINDIANAST

ARIZONA
AV

W CARLSON
GLENN

AV WPARK AV
ST
ST
E
AV E
CLAY E

WASHINGTON
OHIO
ALTA
AV
ST

BROCKTON AV
CT
UNIONW

GRANADA
CT
COLUM
BIA
LAWTON

SUN AVSUNWAV

CALHOUN

WEBSTER
TEXA
S

WESTERNW

CARLOTTA CT

TU LANE
CT

PL AVDR
DR
CAMPUS

COLLEGE

BERKELEYLOMBARD

HARVARD

CT DEVON PLBARBRA

COLGATEBROCKTON
UNION
AV
AVSUN

OXFORDPOST

AVWESTERN
ST DR

HERALDTRIBUNE AVBROCKTON
ST

AVEDWARDS
E
AV
AV

OCCIDENTAL

DR CORNELL

PURDUELN
AV
WY
AV
AVST
LN
AV
LN

AV CARDINALJONI LNFALCON

BELINDA

AVST AV
C
O
U
NTRY

AV EMILIA

ANTHONYDR

CAMPUSCAMPUS AV ST
CLOCK

AVCLOCK

CAMBRIDGE

COLLEGE AV COLLEGE
RENEE
AARON
PADUA

ST PRADOPLACER ST

STLEY RAEMEEPED-
EM
ILY

CORNELL AV
MIA CT
CT

ALPINEMENDOCINO

FLORENCE

NAPLES AVNICE BARCELONA

VIA VIA

WYRAVEN NACT STBROCKTONE
DR
ST
JASM
IN
E
N
MENLO
AVLN

KENSINGTONBR
ID
G
E
KNIG
H
TS-
LN

WATERFORD AV
M
ERCED

HEATH ANTIBES

SANVIADEARBORN

MAPLE AV
REMO

JASMINEVIAVIADOVER
AV
ST

ROCKCT CT
STONE

PEBBLECTBERYL
ST

GRANITE CTSTCINNABARSANDSTONE
QUARRY

TOURMALINE AV

OLIVINE AV

NICE AV

TURQUOISE

JASPER NICE
COLTON

ANSLEYSTQUARRY
SAND

RHYOLITE ST
ST

STMOSS GOLDBANNERDR BARBARALEE LN

NICE AV

LADONIA LN

DRMARBLE

FELDSPARSHALE
BASALT
DR

ZA N JA
AV
RD

LINDAAV NAPLES
C
T

WYST ZANJA

ROSEDR ZANJE
R O
AM
ETHYST

AVHAZELWOODAVE

LARIMORE
LN

CHAPARREL
LN

STONEW OOD
ST
LN

MIRAMONTE ST

CHULA VISTA ST

LOMAS VERDES ST

JUNIPER ST
2570110701
OAK ST

MTN VIEW AVLANE ST

COTTONWOOD RD

STATE ST

MEAD ST
LOMAS

VERDES ST

MYRTLE ST

PARKAMIGOS W
RANCHO

DRDR ESSEX CT
W

MISSOURI
CT
CENTER

BUSINESS
CT
ST
KANSAS
CT

STORAGEHOWARD
PL
ST
W
PARK

AV EPEARLW

W H IGH
AV
3RDAVRUIZ ST
LANE
E
ST
3RDST

SHOPPERS
ST
EUREKA
ST

LAWTONSTUART
ST STSTN 1STSAN

KENDALL

ORIENTAL AV
N
HIGHE

STBO-NITAAV SYLVAN
BLVD
AV
ST11TH ST

STILLMAN
PEARL

E HIGH AVAV
STST
STUARTE 11TH
9TH7TH
ST
10THSTATE

CENTRAL

THE TERRACE
ST CT
ST
NCOOK
G
RO
VE

SYLVANAV

AVE PARK

CENTRAL

CERO CT
ST
AVST

DIVISIO
N
CHAPEL
SYLVAN

DEX TE R WY
LN

POWELL M
ITC
HELL

CENTRAL AVRYAN

LINCOLN

LNCENTRAL

AV LN LN

FALCONCARDINALN
AV
SANDY
LN

LN DAISY C TST

STILLMAN

FALCONCARDINAL
BLV D

LARAMIE

CTCRAIGAV KAYE CT LIDO
NAOM
I
G
EO
RGIA

STILLMAN

AVSTILLMANJEREM
Y

ST STST
CIR
CIR

KIN GSTON
CIR

C AMBRIDGE
C I R
DR

STR ATFORD

CI RHAMSTEAD CIR
ST

CRAFTON
CT

RAINBOW
LN
LN

VALENCIA

CARNESINDEPENDENCE
BLVD
BRO
O
K
W
EST-
AV SON
ST

JEFFER-
ADAM
S
ST

HERRINGTONBARRIN G- NESS

TONCIR HART-
W
Y
FO
RD
LN
CIR

WILLOWCREE K
VAN
CT

LISA LNC
T
CT

LA SALLECHRISTOPHER NAM
BER

FERNDALE CTGREENBRIARAUBURN
CT
AV
MOBILE
HOME
PARK
DR
AV

AV CTLARAMIE
AV

INDEPEN
DEN
CE
AV
JASPER3RD
BLVD

SYL VAN
3RD AV
B
ST
LORO
VERDE
AV

PEPPER WY

VAN LEUVEN ST
ANITA
ST

SHEPARDSON DR

LA MAR RD

TAYLOR ST

MISSION RD ORANGE
IOWA
W
ST
AV
ST
CENTER

BUSINESS
CT

GOLDENROD

HYACINTH

SUNFLOWERLUPINECROCUS

CITRUS TAMARISK
N

STCTMATTH EW

CTRACHEL

NAVPINE ASH
ST

PALM B ROOK
DR
ROMA
STATE
TER
W
PL
CEN-
SAN
MATEON
CT

ORANGEWOOD
DR S

GRANTALVARADO
AV

W VINE STS
EUREKA
ST
ST
5TH

W CITRUS AV
ST
PINEAV
N
PARK
W
OOD
DR
PL
0 LINDA SMICHIGANSGLENWOODS ASH ST

GRANT ST

BUENA GORGONIOSTNCENTER

CITRUSWMICHIGAN
AV

ST DRVISTA
S

E HOME PL

HIBISCUS
ST
CHURCH
VINE

AVST SONORA
ST STE
S ST

NORDINAE
CLARK
ST
ST 4TH
LAST
PALOMA
ST
LA
CIR

SONOR A
ST ST7TH 8TH 9TH
S 6TH
E
OLIVE
MYRTLE
GROVE
NAPA
AV
CT

MCAU-LIFFE
CT
CIR
AV

DRACENA
CT
CT
S

MORRISON

ARDMORE

ARDMORE
LEMON
ST
S
LYTLE
ST
LIME
ST

BERMUDA

CORONADORDROOSEVELT

AV LYTLE

AVEARDMORE

UNIVER -UNIV
ER-

SITY PLSITY
S
T

KENWOOD
DRCT

LORI CT
ST
LN

REDLANDS
GARY
ST
ST

SPARROW CT

S LINCOLN
IDYL
LW
ILD
HEM
LO
C
K
CT
CORAL
C
T CT
E

DIAMONDST PALM

FERNW OOD DR
GROVE

EASTWOOD

BALFOUR
CT
CT
PINEW
O
OD

HIGHLAND

BEGONIA
CT
STCT

E DRST C T
CAMBON
DEL-

AMHERSTCT
DR JAD
E
CT
AV D
EAR-

ELMWOOD

CTCTRAINIERC
T

LNSOMERSET
ORANGE
PARK

PARKVIEW

SUNNYPARK EASTPAR
K
M
O
UN
TAIN
VIEW

CTLN IERRAIN-

MARIA CT

BROOK SOMERSET
LN

STAV ARCATA
FINCH
DR

SGARY DOLORESSLN SIDE LNMORNING-STST
VELW
OO
D

KLAMATH
AV
W
Y

DONNAWYSILVERTREE

STDR WESTPARK

SHIRLEYLN LN
SUE
ST

MEADOW -

DEARBORN LA SALLE
BOR
N
CIR
AV

WALNUT ST

HIGHLAND
CIR
ST
11299
25701
SUN
RISE
WAY

MA R IPOSA ST

VIA RIO

VIA ORO

VIA LAGOS

VIA NORTEVIA CAPRI

LOMA LINDA DR

PROSPECT AVEBELLAIRE ST

POPLAR ST

BELLAIRE STEXETER ST

STARR ST

DAISY AVDAISY AV

TULIP AV

VILLA DR

ASPEN AV LOMA LINDA WAY

PROSPECT AV

BARTON RD

MAYBERRY ST

LAWTON AV

VIA LIDO

WHITTIER AV

MERRIL PL

BARTON FRONTAGE RD

GARDENER ST

BRYN MAWR AV

JUANITA
ST
ADELLA
ST

BARTON RD

MAYBERRY
ST

HAVSTAD DR
PL

NEWPORT

AVWORKMAN

WALLACK PL

CAMBRIA LNCARDIFF LN
1ST ST
1ST ST

STLADERANEW

BERMUDEZ
ST
ROMERO
RD
JERSEY
KANSAS
AZALEA
CT
ST

TRCH E Y ENNE

CALVARY
CIR

CASCADE

MORNING
D
O

VE L N ST
SAN
LN

JACINTO

HASTINGS
HAMLIN
PL
ST

CTFALLBROOKW

AVSAN STRAFAEL

BROOKDALE
DR
DALE
ST

STAVMILBURN
S
TCT
DALTON
MARTY

AVLAKESIDE
KATHI
STST
MILLS
AV

MAGNOLIA
AVAV

JENNIFER
ST
AV

SANPARKER MATEOPRICE

TENNESSEE
CT
ST
NORTH
PL
ST
BUENA
CLARK

NORMANDIE
BOND
WR
OMA

FREMONT
SST
ASH

NORWOOD STAVST AV ST
ST ST

FULBRIGHT

FLETCHER

NANETTE
NORW

OOD STST OLIVE

MELBURY

PLMELBURY CT

CTLILAC

AVORCHID

E AVPRIMROSEGARDENIA

PALMW PALM LN E

DR ALDENWY
SALE
M

STANDISHBREWSTER
LN DR
CT

CYPRESS
LN
E

GRANT ST
STHOME

EUREKAW CYPRESS

CIRVISTA
ST

CLIFTON
CT
ST
PL
VERNE
CARRIE

PLE HOME ST
CT
ST
DR
RD

CIMARRON
BIRCH
CT
DR

EVERRON
CT

EVERGREEN

CALLE DEDRPALM
SILVA

CORONADO

DR LA DR
PALOMA

LOTUSCT

JUNIPERCT

PHLOXCTPROVIDENCE

ST PLLOTUSAV

PLPHLOX BRAD-

PURITAN ROSETTEFORD
AV
RD
ST

PL MAYFLOWER

BERMUDA

ORCHARDROOSEVELT
DR
DR

NORTHVIEWPL

VIEWPLE A SANT
DR

CRESTVIEW
KENW
O
OD
RD

LNFARVIEW
HILLS
RO
LLING
HAVEN
DR
6TH
DR

STARLIGHT
CT

SHADOWBROOK
CT
CTCT

BRIGETTE
W
ILBA
R
SILV
E
RTREE
CIR

SALLELN
LA
S

BRITTANY
AV

BRIANGABRIELLE
JESSE
ST
AV

COTTAGE TERRACE
ST
KING
KING

HURON ST

CEDAR WY

CYPRESS ST

ALMOND CT
PECAN
W
Y

WELEBIR ST

MURPHY ST

HURON ST

CRESTVIEW DR

POPLAR ST

LAWTON AVR
AYCT

MANDARIN
CT

BIRCH AV
CAMDEN
WY

VILLA LA

BENTON ST

RICHMONT RD

POPLAR ST

MANDARIN CT

MTN VIEW AV
DAVIS
WY

LOZANO PL
M
AR
TIN
ST
HUDSON
ST

BROOKMERE AV

KELLOGG ST

HINCKLEY ST

LARGO CT

NELSON ST
W
ILEY
ST

BUTTERFIELD STHURON ST

ORANGECREST WY

CARROL CT

ALLEN WY

NICKS AV

CORNELL ST

MARGAR ITA LN

FR ANCISCO LN

MANUEL AVE

ANTONIO CIR

GEORGE ST

CALDY AV

ROBIN CT

MAPLE AVE

SANDRA CT

SAINT ANDREWS
PL

BRENTW OOD AV

BANCROFT ST

BRIARWOOD
CT

BEVERLY CT

REYNOLDS ST CRESTHAVEN
CT

CAM ELOT
AV

BUCKIN GHAM RD

NORMANDY LN

EMERALD DR

ST ALBANS LN

LANDSDOWN RD

KNIGH TSBRID GE PL

ESPERANZA ST
CROWN

HEIGHTS DR

WESTMINSTER
CT

VICTORIA LN

GREENW ICH RD

GWENT ST

ABERDARE ST

PEMBROKE ST

MILFORDHAVEN RD

PICTON ST

WINDSOR DR
ST

S NEVADA

BEAUMONT AV
W

ELLESLEY
AV

POPPY CT

LAUREL AVE

TANAGER CT

HUMMINGBIRD CT

AMHERST CT

COLUMBIA CT

HOLLIS CT
CT
AV

ROBERTS

CALLE CONSTANCIA BLOSSOM
CT
WY

CHISHOLMCONESTOGA

BELLEVUE
ST

CARMODY
CT

CHELSEA

DARLENE
WAY
CT

AVCORDOVA

CHANNING
C
AR
M
O
D

YCASCADE
ARROW
-
SHERW
OOD
VIEW

NOTTINGHAM
DR
ST

CLOVERFRIAR
LN
ST
ST
AVAV

AVSAN AV LAUREL
VISTA
BELLA
BELLA

FULBRIG
HT
VISTA
CT

ST IRISST

AV SUNNYSIDE

LAUREL RD CANDELA
CREST
ST
STEELE

CTBELLEVUE
MILLS

PABLOBLOSSOM

GIDEONWY
AV
DANA
AV

ST PACIFICST
PALM

GARFIELD

ROBINHOOD
LN

MCKINLEYST KEVINST MONTEREYHARDING
CASA

LEON DRDE

LNFOREST
DR
AV

CT LOLITA
SAN

HASTINGS

JACINTO DREUREK
AST

PROSPECT
DR
BANYAN
DR
WY
S
RAMONA
AV
AVWY
AV

KIMBERLY
PL
DR

ESTHER WY
ST
C
AV
ST
DR
LN
RHON
DA
LN
PAIGE
AV
CREST-
W
OOD
LN DR

SHERRIL
AV
BO
W
DR
GRAND
VIEW

CRESCENT
E BOW
SUMMIT

SUMMITB

CAMPBELL
B

FR A NKLIN
CAJON
ARROYO
RD

YORKPRISCILLA

AVWY STCARVER

CULVERTCIRST

ELMCARVER
CT
FOX CT

BRIGHTONAFTON

HAMPTON DR
CT RD

BRADBURY

RESERVOIR
ST
LOS
ROBLES
CREST
OAK

CYNTHIA

CREST PATRICIA DR
DR
ST

MARSHALL CHAUCER

PARKFORD
RDAV
RD
W

IMBLETON

CT BUCKINGHAM
DR
DR
LN
DRCT

DEVONSHIRE
M
ICHAEL

CONCORD

CAMELOT DR

MARION MARVIN

S HE FFIELD
LN
LN
LA

DRVALENCIA
W
ALNUT
ST7TH

COU NTRY
RD

PANORA MA

MIRABELLA CT

EASTBERNLN
COLINA
DR

OVERCREST
DR

CATHERINE
ST

CRAFTONAV DOVE
CT

CTHILLS DR
TEAL
DR
CAMPUS
DR
CAMPUS

CIRCLE DR

VIOLETST
BR
EN
TW
O
O
D

CLIFTONHILARY

SUNNYSIDE
LN
PL
CT

LNPIEDMON T LN

SMILEY HEIGHTS
KEVIN
DE

IRIS DRLAKESIDE

CT STST AV
LN AV
LINDA

BEAUREGARD
CREST

CASCANTE
SM
ILEY

EDGEHILL

HEI G HTS
D R
HARP
PL

ACACIAPALMAS CALLE
W
OO
DEN

BR IDGE
LN
ACACIA
CT
AV
SESPE

VISTABELLEVUE

HEATHER

JACINTO
AVST
CEDARS
SAN
LA

MONTEREY

CHESTNUT

WALNUTAV LN

SHERWOOD

NOTTINGHAM

SERPENTINE
KINGS
ST WY
DR

PLSILVERW
OOD

DR CRESCENT
W
GREENW
O
O
D

ROBINHOOD

SANWSHERW OOD
CT ST

KNOLL RD
CENTER
ST
CENTER
ST

ST CABAL-
LERO
LN
S
BALBO
A
CT

AV MONTEREYLALA ARRIBACRESTA DR PACIFIC
DRDR

STDR LA
FLORA

L A FELIZ DR
CTAV
ST
ST

MONTICE
LLO

HENRIETTA
E

ANITAHENRIETTA
STAV

FAWN STCT

FOUNTAIN

W SOUTH
ST ST
IVYMY
RA

ELIZABETH
BURGIS
CREST

FOUNTAIN
PL

PROSPECT

HILTONW
DR AV

PAMELACREST
LN
JU
AN
ITA

MARILYN
BR
ANDO
N
CT
PATR
IC
IADR

FELISAAV STCTBELMONT
CT

AVSOUTHE
CT CT
LN
BELAIR
WY

HILLSIDE

LYNNEWY FRANKLINSUNRIDGE
HELENA
FO
RD
HILTON

KELISA CIR
AV
CT
RD

KIMBALL
LN

ACCESS RD
MARGA
RITA

MARJORIE

LN CREST

GOLDEN WEST DR
SOPHIA
CT

LEXINGTON
D R

RIDGECREST
DRDR

OVERCREST

RIDGECREST

MARBETH

TENNESSEE
LN
DR
CT

TARRYTON
CT
17TH
OHIO
STCT
QUAIL
CT

OAKWOOD
CIR

PINON CT

LIANA C
R
AFTO
N
PO
INTE
D
R
SAGE
TENNESSEE 18TH
ST
RD
PL LN

MARBETH STDR
RESEDA
ST
18TH

CRAFTONHILLS
CT

CRAFTON
HUTTON
32301

STTENNESSEE

LINDA LADERA
AVENUE
CT

YUCAIPA BLVD

FRONTAGE

ROSEHILL

AV CREST
CALLE

CALLE DEBARRANCA
CALLE
DE

LAS OCOTILLO
RD
ST

W SUNSET

STERLING

MATEOST
DR

HERMOSA
MIRA
MONTE

D RCREST

PINE KNOLL
CREST

DRAKERIDGE
CRE
ST
ARROYO

DR MONTE VISTA
CRO
WN
ST
ST

DRVERLIE DR
CREST

BURKEST
RD

REBECCA
CAMEO
CREST

CAROB LO M A

LA DRST

KINCAID
HALSE

YWYPEPPER
ST
ST
W
DWIGHT

BE NITA
M
A
RIE
RIDGE
CREST

ST HENRIETTA

MANZANITA
DRDR S

CENTER ST
DRST
DR
LNDR
W

ESTWOOD
VIA
A
R
BOR
D
R

GARDEN JORDAN
HILL
DR

ST B EVERLY

MARIPOSA DR

SARRITAPOPPY

CANDY EUCALYPTUS
LN

MARCIA DR DR

LAMIRADA
VIEW
DR
DRDR
DR

LOMACAMINO PALO
VERDE
D
R
REAL C
O
UN
TR
Y

FAIR WAY DR

E MARIPOSA
C
O
UNTRY
CLUB
DR

DRVISTA

ALTACLUB
VALLEY
S
SUNSET

LN KYLEDR
CALLE
SO
LEJAR
CT

PANORAMA

POINT DRS
W
ABAS
H
AV
E

MARIPOSA

LA VALLE
DEL
SOL
WY
SOLANA

DROVER-CREST
DR
RD

HAMPTON
DR

HILLTOP
ST
LINDA
SIERRA

CRILLY LNDRRIDGE-
WOODDR
OUTER
G
OLD
HWY 10

KNOLLHILLHILL
GOLD

DRGRA DE
C
RESTW
O
OD

LINWOOD TER
VISTA
C
REST
ST
E
17TH
ST
AVENUE
DUNLAP 18TH
BLVD

CHINABERRY
G
LADYS
LN
ST
15TH ST 14TH ST

RUBY LA

PECAN AVROSS PL
OAK CT
13TH ST

AVENUE E

PARADISE LA
DR
SM

ILEYRIDGE
FAIRMO
NT

EDGEMONT DR
RD

SUNSET HILLSLN
RDDR

SIERR A
CANYON
RD
CANYON
DR
DR

ROSSMONT
RD
VALLE
VISTA
DR

CHAPPARALRD
DR

COUNTRY
LN
CLUB

COUNTRY
C

OPPERHILL

COPPER HILL CT
LOS
CLUB
PALO

VERDE VISTA

VISTA DR
RD DR

ELDER ELDER
WY

COUNTRY

ESCONDIDO
LA
(SUNSET LN)

MIRADERO
DR
MIRA
PL
S
VALLEY
VIEW
D
R
SO
LAN
A

ALTO DR
PUES
TA

CTMIRASOL
PL
DR
DELDR

SOLCLUB
S OL
ALTA

DRVIA DEL

WYHILARY

ALTOS DR

ALLISON

LA SOLANA CT
DR DR
BAR
RU
LN
DR
CANYON
KNOLL

HILLTOPMESA
LN
MESA
DR
BA

RALTA VISTA

LN RUSOUTH
CLUB
CT
EMERY
H
IG
H
VIEW
LN
LN
DR
ST
ST
17TH
17TH
STDR
ST
N
AVENUE

HIGHVIEW
THOM
AS
RD

KENDALL
WY
DR

FLORIDA
18TH
ST
16THFLORIDA

DUNLAP BLVD

MAPLE CT

SERRANO DR

TEXAS DR

FAIRMONT ST

LOMA VISTA CT

KENTUCKY
ST

ARLINGTON
DR

CREEKSIDE DR

CREEK VIEW
LN
HORS
E

TRAILDR

SUNSET HILLS LN
DR
CREST

CANYONVIEW LN RIDGEVIEW
CT
MESA
VIEW
LN

LANTERN

S AUGUS
CT

EDGEMONTDR

EDGEFAIRLN
HELEN

VINTONWY
LNRD
LN
CT
HELEN
CT

DR KRISTIN
BURNS
FREYA

DANELAW

ASHFORTH
DR
LN

SILVERLEAF
CT

BEDFORD
DR

DR DR ENDYMIONWY
AV DR

SUTHERLAND
ST
NEW
YORK
ST
NEW
YORK
ST

CONN WY

SAVANNAHLN SEDONACTMONTEREYCT

CAPISTRANO
LN

CHESAPEAKE
CT

STRADA CASALINGO

HERITAGE LN

DAFFODIL LN

BUTTERCUP
CT

SAPPHIRE

SNOWBERRY LN

CANTANIA AVE
CARMEL
CT

FRANKLIN

CTFRANKLIN WY

TOURMALINE AV

CRYSTAL
CT

RIVER BLUFF AVE

AMARYLLIS CT
SMILEY
BLVD

ORANGE TR EE LN

OAK GROVE
DR

UTILITY
ACCESS
RD
DR
N

CHURCHLASHEART
EMS AV
TRES
ST

DRLAGOS

DOMESTIC
AV

AVFLORENCE

PATTISO
N
LN
DR

BONVIE W

RESERVO
IR
RD

RESERVOIR
TR
AV

CRAFTON HILLS
RIDGE

CRAFTON

CANYON RD

HAMPTON RD

PRADO LA

CANYON RD
RD

HAMPTON

PILGRIM RD

PILGRIM RD
0 0.25 0.5 0.75 1
Miles
Solid Waste Collection Days
Scale
November 15, 2013wo1156RefuseDays8.5x11
Redlands Regular Meeting of 09-17-24
755 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
756 of 790

APPENDIX F

CONTRACTOR SAFETY PROGRAM
Redlands Regular Meeting of 09-17-24
757 of 790

THIS PAGE INTENTIONALLY LEFT BLANK

Redlands Regular Meeting of 09-17-24
758 of 790

THE CITY OF REDLANDS

CONTRACTOR SAFETY

PROGRAM
Rev. June 15, 2021
Redlands Regular Meeting of 09-17-24
759 of 790

TABLE OF CONTENTS
I. POLICY ......................................................................................................................3 II. AUTHORITY ..............................................................................................................3 III. SCOPE .....................................................................................................................3 IV. DEFINITIONS ...........................................................................................................3 V. RESPONSIBILITIES ....................................................................................................4 RISK MANAGEMENT... …………………………………………………………………………………………………………4 PROJECT MANAGER (CITY)……………………………………………………………………………………………………..5 INSPECTOR (CITY)………………………………………………………………………………………………………………..5 EMPLOYEES (CITY)……………………………………………………………………………………………………………….5 CONTRACTOR…………………………………………………………………………………………………………………….5 PROJECT SAFETY OFFICIAL……………………………………………………………………………………………………..6 VI. PROGRAM ..............................................................................................................6 SAFETY PREQUALIFICATION QUESTIONNAIRE……………………………………………………………………………..6 APPEAL PROCESS…………………………………………………………………………………………………………………7 CONSTRUCTION PROJECTS (TIER I AND TIER II)…………………………………………………………………………….8 INSPECTIONS……………………………………………………………………………………………………………………..9 TRAINING/DOCUMENTATION………………………………………………………………………………………………...9 NON-COMPLIANCE………………………………………………………………………………………………………………9 CITY PERSONNEL………………………………………………………………………………………………………………….9 VII. RECORDKEEPING………………………………………………………………………………………………….10 VIII. ADDITIONAL REFERENCES ................................................................................... 10 ACKNOWLEDGMENT OF RECEIPT (A)……………………………………………………………………………………….11 SAFETY PREQUALIFICATION QUESTIONNAIRE (B)………………………………………………………………………..12 NOTICE OF NONCOMPLIANCE (C)…………………………………………………………………………………………..13 JOB HAZARD ANALYSIS (D)……………………………………………………………………………………………………14 INCIDENT INVESTIGATION FORM (E)………………………………………………………………………………………..15 Redlands Regular Meeting of 09-17-24
760 of 790
I. Policy

CONTRACTOR SAFETY PROGRAM
The purpose of this Contractor Safety Program (“CSP”) is to ensure, as best as reasonably possible, the protection and safety of all persons and property during construction activities undertaken by private contractors on behalf of the City of Redlands (“C ity”). The City has a comprehensive and structured approach in outsourcing services performed on City facilities by third -party persons and entities (“Contractor(s)”). The first phase of this comprehensive approach includes actively screening Contractors based on safety records, safety performance, and safety compliance. After the qualified Contractor is awarded a contract, the Contractor must then ensure compliance with all local, state, federal and Cal/OSHA regulations applicable to the contracted scope o f work, and requirements set forth within this CSP. The Contractor, its agents , and personnel must adhere to the policies and procedures set forth by this CSP and all applicable laws and regulations.

II. Authority
California Code of Regulations, Title 8, Section 336.10 “Determination of Citable Employer” California Code of Regulations, Title 8
“Greenbook” Standard Specifications for Public Works Construction Redlands Municipal Code
California Building Code
III. Scope
This CSP applies to all Contractors who provide or render construction or improvement services for City- owned property and facilities.

The Contractor services covered under this CSP include, but are not limited to, the following:

A. New construction;
B. Remodeling;
C. Facility maintenance or repair;
D. Equipment installation or maintenance; and
E. Services (i.e. janitorial, fleet operations, landscaping, etc.)

Consultants/ Professional service providers are exempt from having to submit a Safety Prequalification Questionnaire (“SPQ”), prior to the beginning of work, but they are expected to be compliant with industry best practices with regards to maintaining a safe work environment for their employees and others.

IV. Definitions
A. Contract – any written agreement between the City of Redlands and a Contractor, to perform a specified scope of work on City facilities. With respect to this policy, a contract includes, but is not limited to: awarded purchase orders, bids, and/ or project contracts.

B. Construction Work – construction, alteration, and/or repair, including painting and decorating.

C. Contractor – a person or entity (including all personnel) awarded a contract to perform work on City property or facilities.

D. D.A.R.T Rate – Injuries and illnesses severe enough to warrant: Days Away, Restrictions and Transfers. The DART rate is calculated using the following formula: Number of OSHA Recordable injuries and illnesses that resulted in Days Away x 200,000/divided by total hours worked by all employees during the year covered.

Redlands Regular Meeting of 09-17-24
761 of 790
E. Designated Work Area – an area where it is necessary to restrict or limit entry or access of nonessential personnel or the public. Examples include work areas involving remediation abatement, demolition, excavation, and overhead lifting.

F. Facilities – any building or property owned by the City of Redlands.

G. Hazard – source or situation with a potential for harm in terms of injury or health, damage to property, damage to workplace environment, or a combination of these.

H. Job Hazard Analysis (“JHA”) – a technique that focuses on job tasks as a way to identify hazards before they occur. It focuses on the relationship between the worker, the task, the tools, and the work environment. The objective is to eliminate the r isk or to utilize control measures to reduce the risk.

I. North American Industry Classification System ( “NAICS”) – is the standard used by Federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. business economy.

J. Non-compliance – any deviation from standards, practices, processes, procedures, regulations etc. that could either directly or indirectly lead to injury or illness, property damage, damage to the workplace environment, or any combination of these criteria.

K. Notice of non-compliance – form provided to the Contractor by the City alerting the contractor of non-compliance with City specifications, Cal/OSHA regulations, or any other generally accepted safe work practice.

L. Non-compliant hazardous work condition – any hazard that is considered to be non- compliant with State or Federal safety and health regulations, City specifications, or any inconsistency with generally accepted work practices.

M. Personnel – all Contractor employees, contractors, sub-contractors and agents provided access to City property or facilities.

N. Recordable Incident – any injury or illness resulting in death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, or loss of consciousness per OSHA Section 1904.7(a).

O. Safety Tailgate – informal safety meeting generally conducted at the job site prior to the commencement of a job or work shift.

P. Services – any and all, labor, duties, functions and activities required to be performed by the Contractor under the contract and any subsequent addenda.

V. Responsibilities

RISK MANAGEMENT
A. Update, maintain, and administer this CSP;
B. Maintain centralized records of training, site visit data, written programs, tailgate meetings, permits, and all other necessary contractor related documentation;
C. Provide technical assistance to Engineering personnel; D. Attend Pre-construction meetings and progress meetings as needed; E. Provide assistance on safety inspections as needed;
F. Review safety submittals;
G. Provide guidance on pre-qualification determination; and H. Provide training to affected city personnel with responsibilities under this program.

Redlands Regular Meeting of 09-17-24
762 of 790

PROJECT MANAGER (CITY)
The Project Manager has the authority to delegate any or all portions of this CSP to subordinates, but the Project Manager will be held accountable for their compliance. The Project Manager shall contact Risk Management, as necessary, for assistance in relation to this CSP.

A. Ensure safety hazards are addressed in a timely manner; B. Communicate safety concerns during pre-construction meetings and progress meetings; C. Inform impacted employees of construction activities scheduled in their work area; D. Enforce pre-qualification procedures in bidding process; and E. Ensure this CSP is properly executed.

INSPECTOR (CITY)
The City of Redlands construction inspector is not a safety professional and will only provide “Notice of Non- Compliance” for obvious and serious non-compliant conditions.

A. To the best of their abilities, inspect work sites for safety hazards; B. Communicate safety concerns to Contractor;
C. Provide Contractor with “Notice of Non-Compliance” when serious conditions occur or repeat violations; D. Collect documentation needed for construction worksites; E. Submit documentation to Risk Management for recordkeeping; F. Maintain photo documentation of safety hazards;
G. Never enter situations that can harm or endanger himself/ herself; H. Never use personal protective equipment (PPE) or enter situations, which they are not trained for; I. Contact Emergency Medical Services (911) and Risk Management in case of emergency; and J. Attend and communicate safety concerns in progress meetings.

EMPLOYEES (CITY)
A. Immediately notify the Project Manager, inspector, or Risk Management of any safety related concerns at a Contractor job site; and
B. Contact Emergency Medical Services (911) and Risk Management in case of emergency.

CONTRACTOR
Where relevant and applicable, the Contractor’s responsibilities shall include:

A. Compliance with requirements and responsibilities detailed within the Contractor Safety Program; B. Ensure all local regulatory requirements are met and all necessary permits are obtained before conducting work on behalf of the City;
C. Designate a Project Safety Official by name who shall be available at all times to abate safety hazards; D. Ensure all personnel have the appropriate qualifications and training to perform the contracted work (Copies of current training documentation and certifications must be on file with the City); E. Inform City Project Manager or inspector of any job site safety hazards or concerns; F. Inform City Project Manager if any suspected asbestos-containing material is located; G. Conduct and submit Job Hazard Analysis (JHA) before work and as required by change of tasks; H. Conduct and submit Safety Tailgates on a bi-weekly basis; I. Provide all required PPE necessary to conduct work safely and in accordance with required local regulations;
J. The safety of all individuals who enter work site;
K. Spill cleanup;
L. Immediately report any incidents, accidents, near misses, unsafe conditions, or unsafe acts involving any jobsite personnel;
Redlands Regular Meeting of 09-17-24
763 of 790
M. Arrange for the proper storage and removal of waste generated prior to the completion of job, and provide confirmation that the materials have been removed or disposed of in a manner compliant with all applicable environmental regulations;
N. Removing all equipment used during work activities and ensuring proper housekeeping of designated work area at the end of each workday and upon completion of the job; O. Contact Emergency Services (911) and Project Manager in the event of an emergency; and P. For the actions of their subcontractors, as they may pertain to this CSP, including their adherence to its contents and review of this document.

PROJECT SAFETY OFFICIAL (CONTRACTOR)
A. Shall be at the work site at all times;
B. Must be thoroughly familiar with the Contractor’s Injury and Illness Prevention Program (IIPP) and Code of Safe Practices;
C. Shall be available at all times to abate any potential safety hazards; and D. Shall have the authority and responsibility to shut down an unsafe operation, if necessary.

VI. Program

SAFETY PREQUALIFICATION PROCESS
A. The safety prequalification process is intended to:
• Provide the City with knowledge of past and current safety performance of Contractors working on City construction projects;
• Improve Contractor compliance with City safety rules, including safe work practices required by applicable regulations and laws; and
• Improve safety during Contractor activities.

B. A copy of the SPQ shall be provided to each person or entity bidding on a project, as part of the bidding process.

C. The completed questionnaire shall be returned and reviewed prior to awarding contract work, with supporting information provided as indicated by responses on questionnaire.

D. The SPQ shall be submitted to: 35 Cajon St., Suite 4 Redlands Ca, 92373
Attention: Project Name-Contractor Name-SPQ
E. The following criteria and information relating to the Contractor will be reviewed prior to awarding contract:
• Contractor License;
• Incident Rates;
• OSHA Citations;
• Safety Policies;
• Safety Programs and Procedures;
• Compliance History on City Projects; and
• Certification Statement.

F. Contractor must qualify in each section to be approved for award of a contract.

G. If a Contractor fails to pass prequalification procedure, the City has the right to disqualify the Contractor’s proposal.

Redlands Regular Meeting of 09-17-24
764 of 790
H. All costs associated with compliance with City of Redlands prequalification requirements shall be at the sole expense of the Contractor.

I. If a Contractor provides information that is later determined to be false, or improperly withholds information, the Contractor will be immediately disqualified.

J. Any questions or information relating to filing this questionnaire may be answered by reaching:
• Engineering: (909) 798-7698; or
• Risk Management: (909) 798-7514

DISQUALIFICATION APPEAL PROCESS
This provision is established pursuant to Public Contract Code section 20101(d) which requires every public agency that requires prospective bidders to prequalify pursuant to the law to establish “a process that will allow prospective bidders to dispute their proposed prequalification rating prior to selection of an alternate bidder.” If the City intends to disqualify a bidder based upon the bidder’s safety record, the City will notify the bidder in writing and provide the bidder with any supporting evidence that has been received from others or adduced as a result of an investigation by the City. The notice of intention shall be sent by certified mail with return receipt requested or by overnight mail via a delivery service that provides online tracking which identifies the date of the prospective bidder’s receipt of the notice, and shall include notice that the bidder has the right to, and may request a hearing to rebut any evidence used as a basis for disqualification and to present evidence to the City as to why the prospective bidder should be found qualified. Requests for a hearing must be made by written request to the City within ten calendar days of the date of the prospective bidder’s receipt of the City’s notice of intention. If the bidder does not request a hearing within the time allowed, the City’s determination shall stand unchallenged and become final.

Within seven calendar days of receiving the bidder’s request for a hearing, the City shall notify the bidder in writing of the date, time and place of the hearing. The hearing shall be held no sooner than ten (10) calendar days and no later than fifteen (15) calendar days after the notice is given. The notice shall inform the bidder of its right to present testimony and documents in support of its position.

The hearing shall be conducted before the Redlands City Manager, which may be continued from time to time as reasonably determined by the City Manager, but shall not exceed forty five (45) days. At the conclusion of the hearing, and after considering all testimony and documentation presented, the City Manager shall issue a written decision no later than five calendar days following the hearing. The City Manager’s decision shall be final and is not subject to further appeal to the City.

The bidder shall not be entitled to bid on any contracts with the City until it has met the safety pre -qualification standards. If the City Manager approves an appeal, the contractor will have been deemed to meet the qualification standards and it will be valid for one year. The bidder shall have the right to withdraw its application for prequalification or its appeal at any time before the City Manager’s decision becomes final. Such withdrawal will not preclude the bidder from re-applying for prequalification.

CONSTRUCTION PROJECTS
A. After a contract is awarded, the Contractor shall maintain, throughout the duration of the project, safety measures as necessary to protect the public and workers within, or in the vicinity of, the designated work zone. This includes an evaluation of the work to be performed and the hazards likely to be encountered.

Contractors are expected to follow, at a minimum, all pertinent laws, rules and regulations for the location in which they will be working. Where applicable, Contractor Safety Programs will meet or exceed City programs/ procedures and are subject to review and approval by the City prior to contract execution.

Redlands Regular Meeting of 09-17-24
765 of 790
B. Job Hazard Analysis (“JHA”)

1. Prior to a notice to proceed a JHA must be completed utilizing the City’s form, or equivalent, to assess the hazards present in the designated work area. Any information requested on the City’s form, but not stated on the equivalent form utilized, shall be provided separately with the original submission.

2. All members of the construction unit must sign the JHA to acknowledge hazard abatement procedures.

3. JHA must be kept at job site accessible to all impacted personnel.

4. Failure to follow JHA procedures may lead to termination of the contract.

C. Personal Protective Equipment (“PPE”)

1. All required PPE must be worn at all times during work activities.

2. All mandatory PPE must be highlighted in the JHA.

3. PPE shall be provided by the Contractor.

4. Failure to follow PPE guidelines may lead to termination of the contract.

D. Safety Tailgates

1. Safety Tailgate Meetings must be held on a biweekly basis for all construction projects.

2. The first meeting shall take place on Day 1, Week 1 and every other week thereafter.

3. Tailgates shall be signed by all personnel and submitted to Construction Inspector for recordkeeping.

4. Tailgate topics should be specific to the scope of work of the project.

E. Injury Reporting

1. Contractors shall immediately report injuries or accidents to the Project Manager (regardless of severity). Additionally, contractors are responsible for and must also conduct accident investigations of any injuries that occur on site and provide results to the Project Manager.

2. Use the City Incident Investigation Form (Attachment E), or equivalent, to meet this requirement.

F. Spill Prevention

1. The Contractor is responsible for any spill within the confines of the project and those outside of the construction limits caused by the Contractor’s defective equipment, containers, or personnel.

2. Secondary spill containment systems shall be used to prevent contamination of the environment.

G. Construction in Occupied Buildings

1. When building occupants are present during construction projects additional safeguards must be implemented to eliminate exposures and complaints. Dust/ particulates from demolition, sanding and other construction activities must be controlled by adequate ventilation, or containment and negative air ventilation systems based upon the specific type of activity and particle. Similar controls must be utilized for odorous activities including, but not limited to, carpet adhesive, painting, welding, and coatings.

2. The Contractor shall ensure that the HVAC system is protected in order to prevent contamination.

If an HVAC system is unprotected and contaminated by any construction/demolition materials, the Contractor shall be held responsible for the cost of cleaning the system and any subsequent repairs therein.

3. Negative air ventilation systems shall have appropriate filtration and be exhausted outside of the building.

INSPECTIONS
A. Follow up inspections will be executed to enforce compliance with safety and health requirements.

B. Follow up inspections will be conducted as part of routine site inspections by construction inspector and Risk Management employees.

Redlands Regular Meeting of 09-17-24
766 of 790
C. The SPQ aims to provide the City with knowledge of Contractor safety history and safety practices. This minimizes the need for increased frequency of inspections. In addition, the City will take the following guidelines into consideration when determining frequency of inspections.

1. Scale of project;

2. The frequency with which the number and types of hazards change as the work progresses;

3. More frequent inspections will be implemented in the beginning of the project; and

4. When the Contractor has never worked for the City.

TRAINING/DOCUMENTATION
A. Contractor will ensure that all personnel are properly trained for the scope of work they are assigned, as well as the equipment they will be utilizing.

B. Documentation shall be on file with the City prior to project start.

C. Personnel missing training documentation shall not be permitted to work on awarded City projects.

D. Training requirements are mandated by Federal and State Regulations. This may include, but is not limited, to the programs listed in the SPQ.

NON-COMPLIANCE
A. Contractor compliance issues shall be documented on the “Notice of Non -Compliance” form. A copy of this form shall be provided to Contractor for completion.

B. Upon receipt of the completed “Notice of Non -Compliance” form, the Project Manager and Risk Management will evaluate, based on the incident, and identify, as appropriate, any additional corrective and/or preventive actions for completion.

C. If immediate correction is not feasible, the project will be temporarily stopped until the issue is adequately resolved.

D. City staff with authority to stop work are:

1. Construction Inspector;

2. City Project Manager;

3. City Manager; and

4. Risk Management staff.

E. Any violation or deviation from safety rules, procedures, or regulations, based on evaluation, may be subject to any and all disciplinary actions listed as follows:

1. Verbal warning

2. Written warning-Notice of Non-Compliance (work may not continue until approved corrections are implemented);

3. Dismissal of non-complying personnel; and/or

4. Termination of Contract.

The City of Redlands maintains the right to terminate any contract for the violation of safety issues without liability to the City.

CITY PERSONNEL
A. All affected City employees will be informed in advance of any construction related work or other contract work which has the potential for impacting their workplace. Notifications will be made to all affected employees via e-mail or written memo by the Project Manager or designee. Notifications must include the following information:

1. Start and end dates of the work to be completed;

2. Work areas to be affected;
Redlands Regular Meeting of 09-17-24
767 of 790

3. Description of work to be completed;

4. Name and phone number of Project Manager;

5. Name and phone number of Construction Inspector; and

6. Name and phone number of Risk Management.

B. Employees should be instructed to notify Project Manager regarding logistical issues or other concerns.

Safety and Health concerns should be directed to either the Project Manager, Inspector, or Safety Specialist.

VII. Recordkeeping
The City’s Human Resources / Risk Management Department will maintain all records prepared in association with this CSP, with copies also place on file with the office of the City Clerk.

VIII. Additional References
https://www.dir.ca.gov/title8/336_10.html

Redlands Regular Meeting of 09-17-24
768 of 790
Cit
y of Redlands
Acknowledgment of Receipt Statement
I acknowledge by signing this document, that I have received and reviewed the City of Redlands’ Contractor Safety Program and understand that it contains important information on the City’s policies and procedures regarding employee safety as it pertains to Contractor activities. Furthermore, I acknowledge that failure to comply with any of these procedures may lead to termination of the contract with the City.

____________________________ ______________________________ Contractor Signature Contractor Title:
_
_____________________________________ ________________________________________ Contractor Name (Print) Date Signed
If y
ou have any questions regarding this document, please contact the Risk Management Division at (909) 798-7514.

Attachment A
Redlands Regular Meeting of 09-17-24
769 of 790

CITY OF REDLANDS

SAFETY PREQUALIFICATION QUESTIONNAIRE

SECTION 1 – GENERAL INFORMATION

Company Name:

Contractor License #:

Expiration Date:

Address:

City: State: Zip Code:

Name of Person Submitting Application:

Title: Telephone #:

Email Address:

Identify the highest ranking Safety/Health Professional in your Company:

Name:

Title: Telephone #:

Omitting or reporting false information on this questionnaire may result in disqualification of bid.

The City of Redlands reserves the right to conduct random or for-cause audits of information stated in this questionnaire. If deemed necessary, additional documentation may be requested by the City to verify responses on this questionnaire.

Attachment B
Redlands Regular Meeting of 09-17-24
770 of 790
SECTION 2 – INCIDENT RATES & WORKER’S COMPENSATION INFORMATION

INCIDENT RATES
Provide your actual injury and illness data below:

Provide the NAICS Code Number that best represents
your Firm:_____________________________
Provide any additional numbers here:
______________________________________

(Provide three full years of data) Last Calendar

2 Years Ago 3 Years Ago

Number of hours worked by all employees:

Total Recordable Incident Rate*:

D.A.R.T. Rate*:

Total Number of Fatalities:

Incident Rate = [(Total Recordable Cases X 200,000 hours)/ Number of hours worked by all employees]

D.A.R.T. Rate = [(Total Number of entries for Days Away, Restricted and Job Transfer X 200,000 hours)/ Number of hours worked by all employees]

If your latest incident rates and D.A.R.T. rates are greater than 100% of the industry average for all your NAICS code Numbers Listed, your bid may be disqualified.

The industry average can be found at www.bls.gov

WORKERS’ COMPENSATION INFORMATION

1. Provide your Workers’ Compensation Experience Modification Rate (EMR) Data:

Policy Year

EMR
* If your current EMR is greater than 1.25, initialing here certifies that you will provide a competent, full- time person or representative responsible for safety for all City projects:____________
Current EMR*

* lnitialing here certifies that your firm does not have an EMR:___________ (Submit a copy of your firm's Loss Run Reports for the last three years if your firm does not have an EMR.)
1 Year Ago:

2 Years Ago:

Name of your firm’s Workers’ Compensation carrier:
3 Years Ago:

Phone Number of Workers’ Compensation carrier

2. Is your firm self-insured for Workers' Compensation claims? Yes  No  (If yes, please attach a copy of the latest Annual Report to the State of California Department of Industrial Relations and/or State of California Certificate of Self-Insurance.)

SECTION 3– CITATION HISTORY

1. Has your firm received any regulatory citations in the last three years? Yes  No  If yes, please answer the question below.

Redlands Regular Meeting of 09-17-24
771 of 790

2. Were any of the confirmed (Closed) citations classified as Serious, Willful, Repeat, or Failure to abate?
Yes  No 

3. If yes, please explain:

4. Have you abated all of the citations issued to you in the last three years Yes  No  If no, please explain abatement action plan:

SECTION 4 – SAFETY POLICIES
Questions (Please check YES or NO) YES NO*

1. Does your company provide and adhere to a written Illness Prevention Program (IIPP) (CCR Title 8 §3203(a))? If yes, a copy of the program will be required on-hand at the job site throughout the duration of the contract. Please attach a copy to your bid proposal.  

2. Does your company provide and conduct Tailgate Meetings, or equivalent with employees at least every 10 working days. (CCR Title 8 §1509(e))  

3. Does your company have a policy for disciplinary action for unsafe behavior ensuring employee compliance with safe and healthy work practices? (CCR Title 8 §3203(a)(2))  

4. Does your company provide and abide by a written Code of Safe Practices that relates to your firm’s operations. (CCR Title 8 §1509(b)) If yes, a copy of the Code of Safe Practices will be required on -hand at the job site throughout the duration of the contract. Please attach a copy with your bid proposal.  

5. Does your company perform JHAs? (CCR Title 8 §1511(b)  

6. Does your company provide training and retraining programs for ensuring employee compliance with safe and healthy work practices? (CCR Title 8 §3203 (a)(2), (a)(7)  

7. Does your company provide training and retraining programs for ensuring employee compliance   *Please provide reason(s) for NO answer in the box below or on a separate sheet of paper.

Failure to provide the above-referenced documents will result in the contractor’s bid being disqualified.

SECTION 5 – SAFETY PROGRAMS AND PROCEDURES

PLEASE ANSWER ALL QUESTIONS BY CHECKING YES OR NO, AND ATTACHING APPROPRIATE DOCUMENTS THAT MAY APPLY OR AS REQUESTED.

Redlands Regular Meeting of 09-17-24
772 of 790
YES NO

1. Is Confined Space work anticipated in the scope of the work awarded? (If no, please proceed to Question 2)  
If yes, please attach the following: Attached?
Copy of written Confined Space Entry Procedure
 
List of personnel authorized on jobsite to work in confined space(s)  
List of personnel authorized on jobsite to serve as Rescue Team  
Verification of personnel training (copies of certs, cards, etc.)  

2. Is work requiring Lockout/Tagout protocols anticipated in the scope of the work awarded? (If no, please proceed to Question 3)  
If yes, please attach the following: Attached?
Copy of written Lockout/Tagout (LOTO) Procedure
 
List of personnel authorized on jobsite to perform LOTO  
Verification of personnel training (copies of certs, cards, etc.)  

3. Is work requiring a personal lift anticipated in the scope of the work awarded? (If no, please proceed to Question 4)  
If yes, please attach the following: Attached?
List of personnel authorized on jobsite to use lifts
 
Verification of personnel training (copies of certs, cards, etc.)  

4. Is work requiring a forklift anticipated in the scope of the work awarded? (If no, please proceed to Question 5)  
If yes, please attach the following: Attached?
List of personnel authorized on jobsite to use a forklift  
Verification of personnel training (copies of certs, cards, etc.)  

5. Is work requiring a crane anticipated in the scope of the work awarded? (If no, please proceed to Question 6)  
If yes, please attach the following: Attached?
Copy of written Crane Program
 
Copy of all expected Crane operators’ Certifications
 
List of personnel designated as Competent under Crane program  
Verification of personnel training (copies of certs, cards, etc.)  
NOTE: If awarded bid, more documentation may be required

Redlands Regular Meeting of 09-17-24
773 of 790

6. Is Hot Work (as defined by OSHA) anticipated in the scope of the work awarded? (If no, please proceed to Question 7)  
If yes, please attach the following: Attached?
Copy of written Hot Work Procedure
 
List of personnel authorized on jobsite to perform Hot Work  
Verification of personnel training (copies of certs, cards, etc.)  

7. Is Trenching/ Excavation work anticipated in the scope of the work awarded? (If no, proceed to Question 8)  
Is a plan in place for the disposal of all material that cannot be returned to the trench/ excavation?  
Are appropriate materials for barricading or securing work area at jobsite?  
Has a permit from the Department of Industrial Relations for excavations deeper than 5 feet been obtained?  
If yes, please attach the following: Attached?
Copy of written Trenching/ Excavation Procedure
 
Copy of Permit if trench is to exceed depth of 5 feet
 
List of personnel designated as Competent under Trenching/ Excavation Program  
Verification of personnel training (copies of certs, cards, etc.)  
NOTE: If awarded bid, more documentation may be required

8. Is electrical work anticipated in the scope of the work awarded? (If no, proceed to Question 9)  
If yes, please attach the following: Attached?
Copy of written Electrical Safety Program
 
List of personnel designated as Competent under Electrical Safety Program  
Verification of personnel training (copies of certs, cards, etc.)  

9. Is work that may have an arc flash potential anticipated in the scope of the work awarded? (If no, proceed to Question 10)  
Are all materials required to safely perform arc flash present?  
If yes, please attach the following: Attached?
Copy of Arc Flash Procedure
 
List of personnel designated as Competent under Arc Flash Program  
Verification of personnel training (copies of certs, cards, etc.)  

Redlands Regular Meeting of 09-17-24
774 of 790

10. Is work involving chemicals anticipated in the scope of the work awarded? (If no, proceed to Question 11)?  
If yes, please attach the following: Attached?
Copy of written Hearing Conservation Program
 
List of personnel working in high noise areas
 
Verification of personnel training (copies of certs, cards, etc.)  

11. Is work involving chemicals anticipated in the scope of the work awarded? (If no, proceed to Question 12)?  
* Copies of SDS for Chemicals used must be kept at jobsite Please attach the following: Attached?
Copy of written Hazard Communication Program
 
List of personnel performing work with chemicals
 
Verification of personnel training (copies of certs, cards, etc.)  
List trade names of all hazardous materials which you will be using on site:

12. Is work on or adjacent to public roadways anticipated in the scope of the work awarded. (If no, proceed to Question 13)

 
Do you have the appropriate provisions (signs, devices, barricades/)  
Please attach the following: Attached?
Please provide a list of personnel working in traffic areas.  
Verification of personnel training (copies of certs, cards, etc.)  
NOTE: If awarded bid, more documentation may be required

13. Is it anticipated in the scope of the work awarded that exposure to asbestos is possible? (If no, proceed to Question 14)  
Please attach the following: Attached?
Copy of written procedure(s)
 
List of personnel working with potential exposure to asbestos  
Verification of personnel training (copies of certs, cards, etc.)  
Redlands Regular Meeting of 09-17-24
775 of 790

14. Is it anticipated in the scope of the work awarded that exposure to silica is possible? (i.e. sandblasting, concrete demolition, concrete saw cutting, surface grinding, etc.) (If no, proceed to Question 15)
 
Please attach the following: Attached?
Copy of Silica Control Plan
 
List of personnel working with potential exposure to silica  
Verification of personnel training (copies of certs, cards, etc.)  

15. Is work at heights anticipated in the scope of the work awarded? (If no, proceed to Question 16)  
Please attach the following: Attached?
Copy of written Fall Protection Program
 
List of personnel designated as Competent under Fall Protection Program  
Verification of personnel training (copies of certs, cards, etc.)  

16. Is work requiring the use of respirators anticipated in the scope of the work awarded? (If no, proceed to Question 17)  
Please attach the following: Attached?
Copy of written Respiratory Protection Program
 
List of personnel using respirators
 
Verification of personnel training (copies of certs, cards, etc.)  

17. If the scope of work to be performed is not adequately represented by questions (1-16), please list any additional Health & Safety concerns below.

SECTION 6 – COMPLIANCE HISTORY ON CITY PROJECTS
In addition to the previous sections, Contractors that have previously been awarded work by the City, will be equally evaluated on their compliance history in relation to City projects.

Redlands Regular Meeting of 09-17-24
776 of 790

SECTION 7 – CERTIFICATION STATEMENT

I Certify under penalty of perjury that:

a. the information contained herein is true and correct to the best of my knowledge, and

b. no attempt has been made to give false or misleading information or to withhold any information.

Signature of Authorized Representative:

Title of Authorized Representative

Printed Name of Authorized Representative

Date Signed:

Redlands Regular Meeting of 09-17-24
777 of 790

NOTICE OF NON-COMPLIANCE
Project:

Contractor:

Notice of Non-Compliance was issued to Contractor’s representative, , Name
on at .

The following unsafe behaviors were observed at the Contractor’s job site:

If the unsafe condition is not immediately corrected, the City of Redlands may take disciplinary action in accordance with the Contractor Safety Program guidelines.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

To be completed by Contractor

Corrective action plan to abate hazards:

Unsafe Condition Resolved: Date: Time:

Remarks:

Attachment C
Redlands Regular Meeting of 09-17-24
778 of 790

Job Hazard Analysis

Signatures of Employees On-Site this JHA is applicable to:

Project:

Company: Project Safety Official: Project Manager (City):

Scope of Work: Location: Date:

Tasks Potential Safety
Risks/Hazards
Safety
Controls/Mitigat

Required PPE
Hard Hat
Safety Vest
Safety Glasses/Goggles
Safety Boots
Respirator
Safety Gloves
Face Shield
Fall Protection
Other:

Employee Signature: Print Name: Date:

Attachment D
Redlands Regular Meeting of 09-17-24
779 of 790

INCIDENT INVESTIGATION FORM

Date of Incident: Time of Incident: Date Reported:

Lead Investigator: Contact Information:

Contractor: Employee Name:

Witness 1 Name: Telephone:

Witness 2 Name: Telephone:

Incident Site/ Location
Incident Summary:

Near Miss Yes No Incident Severity: Minor Significant Major Critical Root Cause(s):

Corrective Actions:

Attachment E
Redlands Regular Meeting of 09-17-24
780 of 790
City Council/Financing Authority Meeting N. 3.

DATE: 09/17/2024
TO: Honorable Mayor and City Council Members
SUBJECT: Approve the regular meeting minutes of May 21, 2024 (Secretary Donaldson)
MOTION:

I move to approve the regular meeting minutes of May 21, 2024 Attachments
Regular meeting minutes of May 21, 2024
Redlands Regular Meeting of 09-17-24
781 of 790

MINUTES

Regular meetings of the City Council and the Redlands Financing Authority of the City of Redlands held in the Council Chambers, Civic Center, 35 Cajon Street, on May 21, 2024 at 5:00 P.M.

Present:  Eddie Tejeda, Mayor
Paul Barich, Mayor Pro Tempore
Denise Davis, Council Member
Jenna Guzman-Lowery, Council Member
Mario Saucedo, Council Member
Staff: Charles M. Duggan, Jr., City Manager; Yvette M. Abich Garcia, City Attorney; Jeanne Donaldson, City Clerk; Carl Baker, Public Information Officer; Danielle Garcia, Management Services/Finance Director; Brian Desatnik, Development Services Director; John Harris, Municipal Utilities and Engineering Director; David Ketcherside, Fire Batallion Chief; Jeremy Floyd, Police Commander; Tabitha Crocker, Facilities and Community Services Director; Robert Meteau, HR/Risk Management Director

Mayor Tejeda called the meeting to order and announced there were no closed session matters scheduled for the City Council to consider. The meeting recessed at 5:00 P.M.

RECONVENE CITY COUNCIL MEETING
The meeting reconvened at 6:00 P.M. with an invocation by Council Member Davis, followed by the pledge of allegiance to the American flag.

PRESENTATIONS

Proclamation Idiopathic Hypersomnia Day
Mayor Tejeda presented the Proclamation declaring June 1, 2024 as Idiopathic Hypersomnia Day Proclamation to Caitlyn Early and her family, Stephanie Muckey, Tim Muckey, and Juliette Early.

Proclamation Dutch American Heritage Month
Council Member Saucedo presented a Proclamation declaring May 2024 as Dutch American Heritage Month to Ken DeWitt, Marcia Van Mouwerik and Doug Jorritsma.

Proclamation Portuguese American Heritage Month
Council Member Saucedo presented the Proclamation declaring May 2024 as Portuguese American Heritage Month to John Fontes and David Moore.

PUBLIC COMMENT
CC_RFA_May 21, 2024

Page 1 ends

Redlands Regular Meeting of 09-17-24
782 of 790
PUBLIC COMMENT
Public comments were presented either in-person, via Zoom, via cell phone or landline.

Reasonable Limits to Vitriolic Speech - Andy Hoder, Phil Courtney and Michael Paisner urged the Council to consider establishing reasonable limits on speakers whose language is inflammatory or vitriolic
Undergrounding Utility Lines - Michael Paisner discovered that the City's undergrounding utility program was discontinued, and he was concerned that this did not align with the General Plan.

Budget Workshop Reflections - In response to the recent Workshop presentation of the Biennial Proposed FY 25-26 Budget on May 20, Dennis Bell said it raised more questions than provided answers, and he listed several concerns and posed questions about a number of items.

Sale of South Mountain Water Shares
- David Armstrong thought it short-sighted of the
City to sell the South Mountain Water Company shares and said it seemed they were undervalued at the time of sale. He asked whether an appraisal had been done and pointed out these were historic water rights.

CONSENT CALENDAR

Minutes

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, the regular meeting minutes of May 7, 2024.

Vote: 5 - 0 Passed

Proclamation Idiopathic Hypersomnia Day

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, the issuance of a proclamation declaring June 1, 2024, as Idiopathic Hypersomnia Day.

Vote: 5 - 0 Passed

Proclamation Dutch American Heritage Month

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, the issuance of a proclamation declaring May 2024 as Dutch American Heritage Month.

Vote: 5 - 0 Passed

CC_RFA_May 21, 2024

Page 2 ends

Redlands Regular Meeting of 09-17-24
783 of 790

Proclamation Portuguese American Heritage Month

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, the issuance of a proclamation declaring May 2024 in recognition of Portuguese American Heritage Month.

Vote: 5 - 0 Passed

Adopt Ordinance No. 2963 Freeway-Orientated Signs & Sign CUP No. 28

Development Services Director Desatnik briefly explained Ordinance No. 2963, amending Title 15, Section 15.36.420 related to Freeway-Orientated Signs and Sign Conditional Use Permit No. 28 was introduced on May 7, 2024, and staff is requesting the Council consider adoption tonight. As public comment, Andy Hoder questioned why In N Out Burger needs any sort of sign at all, especially one that is 95 feet tall, as their name and brand recognition is extremely high. Michael Paisner raised concerns that the Applicant representing In N Out may have misled the Council when they indicated most of their stores have a large sign such as the one proposed for Redlands.

On motion of Mayor Pro Tempore Paul Barich, seconded by Council Member Mario Saucedo, the City Council adopted, by roll call vote, Ordinance No. 2963 amending Title 15, Section

15.36.420 related to Freeway-Orientated Signs and Sign Conditional Use Permit No. 28 to construct a Freeway-Orientated Sign located at the southwest corner of West Lugonia Avenue and Citrus Plaza Drive, on the west side of the Interstate 210 freeway. (In N Out Burger).

Vote: 4 - 1 Passed
NAY:  Council Member Jenna Guzman-Lowery

Adopt Ordinance No. 2967 Agricultural Tourism

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously adopted, by roll call vote, Ordinance No. 2967 pertaining to agricultural tourism and related uses within the A-1, Agricultural zone of the City of Redlands (Chapter 18.20 of the Redlands Municipal Code).

Vote: 5 - 0 Passed

Resolution No. 8588 Street Vacation No. 192 - 665 E Sunset Drive North

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously adopted, by roll call vote, Resolution No. 8588 for Street Vacation No. 192, a request for summary vacation of excess public right-of-way, approximately 4,000-square feet in area that is not used for any public or roadway purposes, located on a property with an existing single-family residence at 665 East Sunset Drive North (APN:
0176-481-01-0000). This proposal is exempt from environmental review pursuant to Section 15061(b)(3) of the California Environmental Quality Act Guidelines.

Vote: 5 - 0 Passed
CC_RFA_May 21, 2024

Page 3 ends

Redlands Regular Meeting of 09-17-24
784 of 790
Vote: 5 - 0 Passed

Agreement for Temporary Shelter Beds for the Homeless

Homeless Solutions Manager David Rabindranath reviewed the Agreement with Church of Religious Science doing business as CRS Redlands for $180,000, to be paid from the Encampment Resolution Funding Grant, to provide temporary shelter beds to the homeless. As public comment, Ed Torres, President of CRS thanked everyone for keeping these services going, and he offered special thanks to Rick Ferguson, the Contemporary Club and Mayor Pro Tem Barich.

On motion of Mayor Pro Tempore Paul Barich, seconded by Council Member Jenna Guzman-Lowery, the City Council unanimously determined, by roll call vote, that approval of the Homeless Resource Services agreement is exempt from environmental review pursuant to Section 15301 of the CEQA Guidelines; and approved the Homeless Resource Services Agreement with Church of Religious Science doing business as CRS Redlands for $180,000, to be paid from the Encampment Resolution Funding Grant, to provide temporary shelter beds to the homeless.

Vote: 5 - 0 Passed

Amending Agreement Automated Metering Infrastructure Project

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously determined, by roll call vote, that approval of the First Amendment to the Non-Professional Service Agreement with Ferguson Enterprises, LLC is exempt from environmental review pursuant to Section 15061(b)(3) of the State's guidelines implementing the California Environmental Quality Act; and approved the First Amendment to the Non-Professional Service Agreement with Ferguson Enterprises, LLC for the Automated Metering Infrastructure Project authorizing a second year extension to the Agreement.

Vote: 5 - 0 Passed

In-kind Support Olive Avenue Market Centennial Event

On motion of Mayor Pro Tempore Paul Barich, seconded by Council Member Denise Davis, the City Council unanimously determined, by roll call vote, that approval of the in-kind support and temporary street closure is exempt from environmental review pursuant to Section 15311(c) of the state’s guidelines implementing the California Environmental Quality Act; approved a request for in-kind support in the amount of $600 relating to the Olive Avenue Market Centennial event hosted by Redlands Chamber of Commerce to be held on June 8, 2024; and approved a request to temporarily close a portion of South Michigan Street.

Vote: 5 - 0 Passed

RUSD Temporary Street Closures

Facilities and Community Services Director Crocker introduced the request for the temporary CC_RFA_May 21, 2024

Page 4 ends

Redlands Regular Meeting of 09-17-24
785 of 790
Facilities and Community Services Director Crocker introduced the request for the temporary closure of Eureka Street, Grant Street, and Glenwood Drive for the Redlands Unified School District graduations from June 3 through 7, 2024. As public comment, Dennis Bell said the graduations held at the Redlands Bowl were simply a nuisance and should be moved to the school's football stadiums.

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously determined, by roll call vote, that approval of the event is exempt from environmental review pursuant to Section 15311(c) of the State’s guidelines implementing the California Environmental Quality Act; and approved the temporary street closures from June 3rd through June 7th, 2024, relating to the Redlands Unified School District graduation activities.

Vote: 5 - 0 Passed

POs for Repairs to Solid Waste Collection Trucks

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, a sole source purchase order with All American Truck & Auto Body in the amount not to exceed $44,694.84 and a sole source purchase order with Rush Truck Centers in the amount not to exceed $54,426.86 for repairs to solid waste collection trucks.

Vote: 5 - 0 Passed

PO Video Detection Units Traffic Signals

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, the sole source purchase order for the purchase of three (3) Iteris video detection units for the traffic signals from Iteris, Inc. for an amount not to exceed $86,782.66.

Vote: 5 - 0 Passed

Facility Use Agreement with Redlands Theatre Festival

On motion of Mayor Pro Tempore Paul Barich, seconded by Council Member Denise Davis, the City Council unanimously determined, by roll call vote, that approval of the Facility Use Agreement with Redlands Theatre Festival is exempt from environmental review pursuant to Section 15061 (b)(3) of the State's guidelines implementing the California Environmental Quality Act Guidelines; and approved the Facility Use Agreement with Redlands Theatre Festival for use of the Sewall Theatre within Prospect Park.

Vote: 5 - 0 Passed

Cost-Sharing / Reimbursement Agreement Water from Pioneer Mutual Water Company

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise CC_RFA_May 21, 2024

Page 5 ends

Redlands Regular Meeting of 09-17-24
786 of 790
On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, a Cost-Sharing and Reimbursement Agreement between the City of Redlands and other shareholders currently utilizing and accessing water from Pioneer Mutual Water Company concerning the Pioneer Mutual Water Company Well Repair and Operations; approved an additional appropriation and re-allocation of funds from the Agricultural Open Space-Acquisition/Conservation Easement category of the Nevada Palmetto Grove sale proceeds in the amount of $100,000. The funds represent the City portion of well repairs needed to supply water to Riverview Grove.

Vote: 5 - 0 Passed

SBCTA Letter of Support

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, a letter of support for the San Bernardino County Transit Authority (SBCTA) to include in their application to Caltrans for the Cycle 7 Active Transportation Program funding.

Vote: 5 - 0 Passed

COMMUNICATIONS

2024 City County Conference Report

Council Member Saucedo provided a report relating to the City County Conference 2024, hosted by the San Bernardino County Transit Authority (SBCTA) held May 16-17 in Lake Arrowhead. The conference brings together elected officials and agency staff to hear presentations about important countywide topics. He and City Manager Duggan attended various sessions, with topics ranging from, Cyberthreats as a Business, Building Better Communities / Homelessness Projects, Street Vending, Changing the Narrative and a Legislative Roundtable discussion.

Resolution No. 8589 Review of In-kind Support Policy

Council Member Saucedo opened the discussion related to Resolution No. 8589, amending the policy for the consideration of requests for in-kind support and/or the contribution of City resources by nonprofit organizations hosting special events within the City. The proposed changes would limit nonprofit organizations to two requests for in-kind support for the period of January 1 to June 30 and two requests for the period of July 1 to December 31 of each calendar year.

Council Members Guzman-Lowery and Davis did not see the value in restricting the number of times a group held events and stressed the economic vitality these events bring to the downtown area and the important work being done to benefit the community at large. Mayor Tejeda thought it prudent to limit how many times one group submits a request and Mayor Pro Tem Barich said that four requests per year seemed reasonable.

As public comment, Michael Paisner was disappointed that this item was even up for discussion and said that it seemed evident to him that the new policy was related to the nonprofit group, CC_RFA_May 21, 2024

Page 6 ends

Redlands Regular Meeting of 09-17-24
787 of 790
Stronger Together Now (STN). Jennifer Maravillas was struggling to understand the purpose of limiting the number of events held, when it will be the community who loses, and she said the optics had the appearance of targeting STN. Andy Hoder stated it would be wise to set standards, and he supported reasonable restrictions, based on value, number of requests, request amounts and size of the events. Redlands Chamber of Commerce Director Evan Sanford suggested the Council consider a compromise by allowing six in-kind requests a year, rather than four requests.

Council Member Saucedo explained this proposal was not prepared in response to the in-kind requests made by Stronger Together Now and after listening to his colleagues and the public, he decided to pull the item from consideration.

NEW BUSINESS

Workers’ Compensation Program

Human Resources/Risk Management Director Meteau provided background of an agreement for Third Party Claims Administration for the City's Self-Insured Workers' Compensation Program to facilitate the day-to-day operations and assure that the City complies with the ever-changing Workers' Compensation regulations.

On motion of Mayor Pro Tempore Paul Barich, seconded by Council Member Jenna Guzman-Lowery, the City Council unanimously approved, by roll call vote, a three-year agreement with AdminSure, Inc. for the administration of the City’s Self-Insured Workers’ Compensation Program in an amount not to exceed $382,320.

Vote: 5 - 0 Passed

Resolution No. 8590 Renaming of Public Facilities

Mayor Tejeda was extremely pleased to introduce multiple resolutions for the renaming and naming of certain public facilities in Redlands. He submitted the recommendations to city staff for consideration by the Parks and Recreation Advisory Commission and the City Council to: 1) Rename the Redlands Community Center in honor of Joe R. Gonzales, which would be in addition to the baseball field in Tract No. 20336, "Joe Gonzales Field," named in honor of Joe R. Gonzales, as there is no limitation noted within Resolution No. 7711; 2) Rename the Redlands Community Senior Center in Honor of Eddie and Gloria Flores 3) Name the Dining Room at the Redlands Community Senior Center in honor of Mary Reyes Sanchez; and 4) Rename the Community Park in honor of Norman N. Martinez and Oddie J. Martinez. On April 11, 2024, the Parks and Recreation Advisory Commission unanimously recommended that the City Council approve the requests.

In joyful celebration of these special individuals who have served the City so well, Mayor Tejeda asked family members to be present to provide historical perspectives and offer personal stories regarding the commitment and dedication of the nominees. Several members of the audience participated, describing the vital and lasting impact the nominees have made on the community.

The Mayor called for a brief recess at 7:45 P.M. so photos could be had by all and the meeting CC_RFA_May 21, 2024

Page 7 ends

Redlands Regular Meeting of 09-17-24
788 of 790
reconvened at 7:51 P.M.

On motion of Council Member Mario Saucedo, seconded by Mayor Pro Tempore Paul Barich, the City Council unanimously adopted, by roll call vote, Resolution No. 8590, renaming the Redlands Community Center in honor of Joe R. Gonzales; adopted Resolution No. 8591, renaming the Redlands Community Senior Center in honor of Eddie and Gloria Flores; adopted Resolution No. 8592, naming of the dining room at the Redlands Community Senior Center in honor of Mary Reyes Sanchez; and adopted Resolution No. 8593 renaming of Community Park in honor of Norman N. Martinez and Oddie J. Martinez.

Vote: 5 - 0 Passed

Amending Agreement for On-Call General Architectural Services

Facilities and Community Service Director Crocker reviewed the need to amend the Professional Services Agreement with Miller Architectural Corporation to increase the total compensation to an amount not to exceed $400,000 and extend the term by one additional year to provide on-call general architectural services. There are several City projects still in progress with Miller Architecture and will not be completed within the initial terms of the agreement. To ensure progress continues on these projects, the Facilities and Community Services Department initiated the proposed amendment with Miller Architecture. The First Amendment to this agreement will continue to help expedite the projects and efficiently use available funds. The funding for this amendment will be derived from individual project budgets in an amount not-to-exceed $100,000. The term of the amendment will extend the agreement by one additional year.

On motion of Council Member Jenna Guzman-Lowery, seconded by Council Member Denise Davis, the City Council unanimously approved, by roll call vote, the First Amendment to the Professional Services Agreement with Miller Architectural Corporation to increase the total compensation to an amount not to exceed $400,000 and extend the term by one additional year to provide on-call general architectural services.

Vote: 5 - 0 Passed

Contract Award Community Park Sports Lighting Installation

Facilities and Community Services Director Crocker introduced the Public Work Construction Contract with Metrocell Construction, Inc. for the installation of sports lighting at Community Park.

On motion of Council Member Jenna Guzman-Lowery, seconded by Mayor Pro Tempore Paul Barich, the City Council unanimously determined, by roll call vote, that the project is categorically exempt from environmental review in accordance with Section 15304 of the State's guidelines implementing the California Environmental Quality Act; and approved the Public Work Construction Contract with Metrocell Construction, Inc. for labor and materials to install sports lighting at Community Park for an amount not to exceed $576,469.26.

Vote: 5 - 0 Passed

CC_RFA_May 21, 2024

Page 8 ends

Redlands Regular Meeting of 09-17-24
789 of 790
COUNCIL MEMBER ANNOUNCEMENTS AND ACTIVITIES

Mayor Pro Tem Barich attended the Library Board meeting and participated in a tour of police facilities, led by Chief Tolber.

Council Member Davis attended the Omnitrans Board Meeting and enjoyed the Youth Hope Dinner event.

Council Member Guzman-Lowery
was thrilled to participate in the City-sponsored Senior Breakfast with a City Official event held earlier this morning at the Community Center, enjoyed the Youth Hope Dinner event and has continued meeting with various constituents to discuss the City's accomplishments.

Council Member Saucedo
attended the skate park competition hosted by the Redlands Optimists Club.

ADJOURNMENT

There being no further action required the meeting adjourned at 8:02 P.M. The next regular meeting of the City of Redlands City Council will be held on June 4, 2024.

REDLANDS FINANCING AUTHORITY
Chairman Tejeda called the meeting to order and offered anyone present the opportunity to address the Board on any subject, not already on the agenda, within the jurisdiction of the Redlands Financing Authority.

PUBLIC COMMENT

None forthcoming

Minutes

On motion of Vice Chair Barich, seconded by Board Member Guzman-Lowery, the minutes of the regular meeting of January 16, 2024 were unanimously approved, by roll call vote.

Vote:  5 - 0 Passed

ADJOURNMENT

There being no further business, the Redlands Financing Authority Board of Directors' meeting was adjourned at 8:04 P.M. The next Redlands Financing Authority meeting will be held on September 17, 2024.

CC_RFA_May 21, 2024

Page 9 ends